Page 1

Audit and Scrutiny Committee 
Tuesday, 29 September 2026 
NOTICE IS HEREBY GIVEN that a Meeting of the Audit and Scrutiny Committee is to
be held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Tuesday, 29 September 2026 at 09:30. 
BUSINESS 
1. Sederunt   
2. Declaration of Group Decisions and Members Interests *   
3. Minute of meeting of 18 June 2026   5 - 12
4. Written Questions **   
5. Internal Audit Section Update Report
Report by Service Manager Internal Audit and Risk  
13 - 84
6. Internal Audit Review - Commercial Harbours
Report by Service Manager Internal Audit and Risk  
85 -
108
7. Internal Audit Review - Home to School Transport
Report by Service Manager Internal Audit and Risk  
109 -
132
8. Internal Audit Review - Management of School Funds
Report by Service Manager Internal Audit and Risk  
133 -
156
Page 1

Page 2

9. Internal Audit Review - Social Care (Short Breaks)
Report by Service Manager Internal Audit and Risk  
157 -
174
10. Treasury Management Performance and Treasury and
Capital Investment Prudential Indicators for 2025-26
Report by  Executive Director Finance, Strategy and Transformation  
175 -
194 
Summary of Audit and Scrutiny Committee functions:
Audit Functions- Consider reports from the Council's internal auditor &
Audit Scotland concerning Council Functions.
Scrutiny Functions- Scrutinising the policies of the Council and their
effectiveness in meeting the action plans of the Council as set out in the
Corporate Development Plan and evaluating the actions of Committees
in implementing the action plans set out in the Corporate Development
Plan.
Performance Monitoring- To receive reports on the performance of and
trends within all of the Council’s services in terms of service standards
and performance information.
Standards -To ensure that the highest standards of probity and public
accountability are demonstrated.     
Watching the Meeting
You can watch the webcast live by going to:    
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 2

Page 3

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by
5pm three working days prior to the day of the meeting, please see Standing Order
36 for deadlines.  A copy of any written answer provided by the Chair will be
published on the Council’s committee management system by 12pm the day
before the meeting.  The Member who has put the question may, after the answer
has been published, may ask one supplementary question directly related to the
subject matter at the meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 3

Page 4

MORAY COUNCIL 
Audit and Scrutiny Committee 
SEDERUNT 
Councillor Scott Lawrence (Chair)
Councillor Theresa Coull (Depute Chair)  
Councillor Peter Bloomfield (Member)
Councillor Tracy Colyer (Member)
Councillor John Divers (Member)
Councillor Jérémie Fernandes (Member)
Councillor Donald Gatt (Member)
Councillor David Gordon (Member)
Councillor Sandy Keith (Member)
Councillor Marc Macrae (Member)
Councillor Paul McBain (Member)
Councillor Neil McLennan (Member)
Councillor John Stuart (Member)
Councillor Sonya Warren (Member)  
Mr Ivan Augustus (Non-Voting Member)
Ms Margaret Wilson (Non-Voting Member) 
Clerk Name: Caroline O'Connor
Clerk Telephone: 07779 999296
Clerk Email: committee.services@moray.gov.uk 
Page 4

Page 5

MORAY COUNCIL 
Minute of Meeting of the Audit and Scrutiny Committee 
Thursday, 18 June 2026 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Mr Ivan Augustus, Councillor Peter Bloomfield, Councillor Tracy Colyer, Councillor
Theresa Coull, Councillor John Divers, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Sandy Keith, Councillor Scott
Lawrence, Councillor Marc Macrae, Councillor Paul McBain, Councillor John Stuart,
Councillor Sonya Warren, Ms Margaret Wilson 
IN ATTENDANCE 
Chief Executive; Executive Director Economy, Enterprise and Operations; Executive
Director Education, Housing and Communities; Executive Director Finance, Strategy
and Transformation; Service Manager Internal Audit and Risk; Service Manager
Provider Services; Chief Officer, Moray Health and Social Care Partnership; Chief
Financial Officer (Depute S95 Officer); Head of Housing, Property and Communities;
Chief Governance Officer (Monitoring Officer); Service Manager Legal Services; Head
of People, Change and Community Strategy; and Caroline O'Connor, Committee
Services Officer, all Moray Council; and Angela Pieri, Grant Thornton - External
Auditors 
1.         Chair 
The meeting was chaired by Councillor Scott Lawrence.  
2.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Orders 21 and 23 and the Councillors' Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member's interests in respect of any item on the agenda.  
With regard to Item 11 "Internal Audit Annual Report 2025-26" and Item 17 "Annual
Governance Statement", Councillor Gatt stated, for transparency, that he is
Convener of the Grampian Valuation Joint Board and would be taking part in the
debate.  
With regard to Item 11 "Internal Audit Annual Report 2025-26" and Item 17 "Annual
Governance Statement", Councillors Warren and Macrae stated, for transparency,
that they are members of the Grampian Valuation Joint Board and would be taking
part in the debate.  
Item 3.
Page 5

Page 6

With regard to Item 5 "Internal Audit Section Update Report", Councillor Gordon
stated, for transparency, that he is a non-executive director of Moray Leisure Limited
and would be taking part in the debate.  
With regard to Item 5 "Internal Audit Section Update Report", Councillor Divers and
Fernandes stated, for transparency, that they are Council Advisors to the Moray
Citizens Advice Bureau and would be taking part in the debate.  
3.         Minute of meeting of 25 March 2026 
The minute of the meeting of 25 March 2026 was submitted and approved.  
4.         Written Questions ** 
The Committee noted that no written questions had been submitted.  
5.         Internal Audit Section Update Report 
The meeting had before it a report by the Service Manager Internal Audit and Risk
providing an update on the work of the Internal Audit Section.  
With regard to the outstanding actions in the Self-Directed Support Follow Up Review
detailed in Appendix 1, Councillor Warren sought assurance that vulnerable service
users were not being adversely affected while the actions have not been completed
and whether there was confidence that all actions would be fully implemented by
2026/27.  In response, the Service Manager Internal Audit and Risk advised there was
assurance from the service that a review and, if required, update of support plans
was being prioritised and Internal Audit would be revisiting it as part of the audit plan
for the following year.  The Service Manager Provider Services confirmed financial
audits were up to date for all SDS packages, and financial reviews highlight any gaps
in care requirements.  He noted it had been a challenging period in terms of budget
savings and resourcing, however review targets had been met across services, with
the exception of the learning disability service which was more complex in terms of
ensuring there are up to date support plans in place.  He confirmed there were
processes in place for assessment and reviewed in terms of prioritisation to ensure
service users are receiving the appropriate level of care.  To provide further assurance
the Chief Officer, Moray Health and Social Care Partnership confirmed a dashboard
has been collated for outstanding internal audit recommendations and timescales to
ensure there is proactive management and monitoring in order to achieve audit
recommendations being implemented within timescale.   
With reference to Appendix 7, Ms Wilson noted there had been a request when last
considered at Committee for training in order to scrutinise treasury managed and
asked whether there was an update.  In response, the Chief Financial Officer
confirmed a training session had been provided to members and apologised for the
oversight of it not being extended to the external members of the Committee.  He
advised Grant Thornton had also provided a webinar which had been shared with the
Committee.    
Following consideration the Committee unanimously agreed to note the contents of
the report.   
Page 6

Page 7

6.         Internal Audit Review - Milnes High School 
The meeting had before it a report by the Service Manager Internal Audit and Risk
advising Committee on an internal audit review completed for the period from 25
March 2026 to 18 June 2026.  
In relation to the bequest in Audit Recommendation 4, the Executive Director
Education, Housing and Communities advised Committee that action was being
taken by the school to ensure the monies were used going forward. 
In response to Councillor Coull noting that unpresented cheques appear to be a
regular occurrence, the Service Manager Internal Audit and Risk advised that school
funds were separate entity to Council funds ,however, agreed there was a theme from
reviews undertaken at other schools.  He confirmed an audit review had recently
been undertaken on the administration of school funds which would be reported to
the September Committee and would address some of the concerns highlighted.  The
Executive Director Education, Housing and Communities further advised the service
had picked up on the issue and were working to ensure there was oversight of the
funds in terms of consistent advice on school fund management.  
Following consideration the Committee unanimously agreed to endorse the
recommendations contained within the report. 
7.         Internal Audit Review - Capital Plan Project Review 
The meeting had before it a report by the Service Manager Internal Audit and Risk
advising Committee on an internal audit review completed for the period from 25
March 2026 to 18 June 2026. 
Councillor Warren asked whether further reviews of other areas of the Capital Plan
would be undertaken. In response, the Service Manager Internal Audit and Risk
confirmed other areas of the Capital Plan would be considered for inclusion in future
Annual Audit Plans. 
Following consideration the Committee unanimously agreed to endorse the
recommendations contained within the report.  
8.         Internal Audit Review - Common Good Fund 
The meeting had before it a report by the Service Manager Internal Audit and Risk
advising Committee on an internal audit review completed for the period from 25
March 2026 to 18 June 2026.  
The Chief Financial Officer advised that implementation of the recommendations is
progressing at pace with financial recommendations well into development and in
relation to Recommendation 4, a Common Good report is to be presented to Moray
Council on 30 June 2026.  
Councillor Warren asked why the consolidated Common Good Register referred to in
Audit Recommendation 1 was not easily accessible for those trying to access the
information about common good in their community.  In response, the Chief
Governance Officer advised the asset register lists those which are common good
Page 7

Page 8

however accepted that was not clearly outlined for the public.  He stated the process
of identification of common good assets involves lengthy research resulting in
extended timescale for implementation.  The Service Manager Legal Services further
advised work is being undertaken with Estates for each individual community to
double check the list and link common good assets to a map which will be added to
the Council's website.  The Executive Director Finance, Strategy and Transformation
confirmed a very recent update had been made to the Council website with a specific
location for the common good asset list.  
Following consideration the Committee unanimously agreed to endorse the
recommendations contained within the report.  
9.         Internal Audit Review - Payroll 
The meeting had before it a report by the Service Manager Internal Audit and Risk
advising Committee on an internal audit review completed for the period from 25
March 2026 to 18 June 2026.  
With regard to Audit Recommendation 2 regarding services being reminded of the
requirement for timely notification regarding notification of new appointments and
termination of employment, Mr Augustus asked whether a stronger approach was
required to ensure compliance.  In response, the Head of People, Change and
Community Strategy advised a paper based system is currently in place however
work was being undertaken with software providers to digitalise the system to make
the process easier for service managers with whom responsibility lies.  
Following consideration the Committee unanimously agreed to endorse the
recommendations contained within the report.  
10.         Internal Audit Follow Up Review - Adult Social Care Commissioning 
The meeting had before it a report by the Service Manager Internal Audit and Risk
advising Committee on an internal audit follow-up review completed for the period
from 25 March 2026 to 18 June 2026.  
With reference to the high priority recommendations in Appendix 1 which were not
implemented but replaced with alternatives, Councillor Warren asked who had
formally approved the changes and whether there was evidence the alternative
arrangements provided the same level of assurance as the original recommendations
agreed by the Moray Integration Joint Board.  In response, the Service Manager
Internal Audit and Risk advised that the audit review had been undertaken by an
external internal audit provider and that a subsequent review of the report identified
the need for greater clarity in the wording of certain recommendations to ensure a
consistent understanding of the implementation requirements.  Having reviewed the
implementation plan to evidence implementation of the recommendations, it was
realised some systems and processes had changed since 2023 resulting in
recommendations requiring to be revised.  Given that the review was undertaken by
an external internal audit provider, no working papers are available to support further
scrutiny of the original audit findings. The Service Manager Internal Audit and Risk
advised that, following discussions with the Chief Officer, the area would be
considered for inclusion within a future Annual Audit Plan, with the outcome reported
to a future meeting of this Committee.  To provide further assurance the Chief Officer,
Page 8

Page 9

Moray Health and Social Care Partnership confirmed many of the recommendations
in the alternative approaches agreed at operational management level and in liaison
with the Service Manager Internal Audit and Risk had been implemented and they
were fully supportive of a future audit being undertaken.  
Following consideration the Committee unanimously agreed to note the contents of
the report.  
11.         Internal Audit Annual Report - 2025-26 
The meeting had before it a report by the Service Manager Internal Audit and Risk
providing Committee with a copy of the Internal Audit Annual Report for the year
ended 31 March 2026, together with Service Manager Internal Audit and Risk's
opinion on the adequacy and effectiveness of the Council's system of internal
control.  
Councillor Warren expressed concern that Appendix 1 highlighted the Moray
Integration Joint Board's (MIJB) risk to deliver services had increased from high to very
high and sought assurance that Moray Council was not being exposed to
unsustainable financial risk through continued MIJB overspends.  In response, the
Service Manager Internal Audit and Risk noted the strengthened governance
arrangements already in place within MIJB as referenced by the Chief Officer in terms
of monitoring audit recommendations and that a review of financial governance
within MIJB has been included in this year’s audit plan, the outcome of which will be
reported back to this Committee.  
The Chief Officer reiterated that increasing pressure on IJBs and their partner funding
organisations had been highlighted in several Audit Scotland reports and confirmed
the risk rating had been increased given the financial pressures and recurring funding
gap set against the increase in demand and complexity of cases.  In addition to the
strengthened governance arrangements, the Chief Officer referred to reporting to
MIJB's Audit, Performance and Risk Committee; Clinical and Care Governance
Committee and reports to every MIJB formally on delivery of the financial plan and
regular operational meetings with both Section 95 officers from the Council and NHS
for early escalation of any emerging issues. 
Councillor Gatt referred to the savings identified during Internal Audit Reviews
totalling £166,530 which he noted proved the value of Internal Audit and encouraged
officers to ensure audit recommendations are implemented within timescales to
reduce the requirement for Internal Audit to undertake follow-up reviews with revised
timescales.  The Chief Executive concurred and confirmed Corporate Leadership
Team are focussed on improving performance in terms of setting realistic timescales
to ensure implementation is achievable, which support was acknowledged by the
Service Manager Internal Audit and Risk. 
In terms of governance, Councillor Stuart referenced the high priority areas in the
plan which may require follow up and asked whether services could self-assess and
report back on progress until any follow up was undertaken to add an additional layer
of governance to ensure momentum of implementation of recommendations.  In
response, the Chief Executive provided assurance Heads of Service have
responsibility for ensuring recommendations are addressed with oversight from
Page 9

Page 10

Corporate Leadership Team, specifically as a standing agenda item on Extended
Corporate Leadership Team meetings. 
Following consideration the Committee unanimously agreed to note the contents of
the annual report given as Appendix 1 to the report.  
12.         National Fraud Initiative 2024-25 
The meeting had before it a report by the Service Manager Internal Audit and Risk
informing Committee of the outcomes from the Council's participation in the
National Fraud Initiative for 2024/25.  
Following consideration the Committee unanimously agreed to note the report.  
13.         Best Value Thematic Review 2025-26 - Asset Management 
The meeting had before it a report by the Executive Director Finance, Strategy and
Transformation informing the Committee of the outcomes from the Best Value
Thematic 2025/26 Asset Management review and inviting consideration of the
findings and actions to respond to them.  
With reference to the report highlighting that the Council holds more assets than are
required, Councillor Warren asked what scale of asset reduction was anticipated
over the next five to ten years and whether there was a quantified target or
rationalisation or whether it would be reactive.  In response, the Chief Executive
advised officers would require to draft proposals for members consideration across
the asset base to agree where improvements are possible while considering how to
improve ways to deliver services to the community, noting the scale of those
improvements will be dependent on budget.  
Councillor Keith referred to the second paragraph of Governance and Performance
(3) in Appendix 1 which stated that the Moray Growth Deal and Levelling Up Fund
projects were impacted due to key partners retracting their committee and sought
clarification as to what realistic profiling could be envisaged to prevent recurrence as
noted in the last sentence of the paragraph.  In response, the Executive Director
Finance, Strategy and Transformation acknowledged there had been a gap however
there was now a specific recommendation to ensure that no monies are spent where
funding is not secured.  
In response to a query from Councillor Warren seeking clarification of the benefits of
moving to a three year capital plan and how members would be aware whether
slippage was reducing, the Chief Financial Officer advised the main objective of
moving to the three year capital plan was to provide greater flexibility of
projects.  However, he noted it was important to recognise that not all projects are
within the Council's control in terms of being driven by both UK and Scottish
Governments however the Council requires to look at the probability of the projects
delivering.  The Council's focus requires to be on elements within the Council's
control and more detail will be included in the Capital Plan report to Moray Council
on 30 June.  
Councillor Stuart, appreciating the plan to update the corporate asset management
plan, asked for assurance that decisions being taken were aligned with a clear and
Page 10

Page 11

robust long term strategy and sought clarification of the timescale of when the
information would be reported to Council seeking decisions relating to rationalisation
of assets.    In response, the Executive Director Finance, Strategy and Transformation
advised the timeline was November 2027 to set the capital plan for 2028/29 which
would allow the new management team structure to progress recommendations for
the Council to consider. The Chief Executive confirmed work was ongoing and would
be reported to service Committees and in terms of adding any additional
programmes or existing programmes being moved to the next stage, it would likely be
autumn 2027.  
Following consideration the Committee unanimously agreed to note the findings of
the Best Value Thematic review. 
14.         Local Government Benchmarking Framework 2024-25 Results 
The meeting had before it a report by the Executive Director Finance, Strategy and
Transformation presenting a corporate overview of benchmarking performance data
for the period 2024-25, having also been presented to the Corporate Committee on
26 May 2026.  
Ms Wilson sought clarification of the basis of the text in the final column of Asset 15
in Appendix 1 stating "Moray has high performing schools that are fit for the future
and financially and environmentally sustainable".  In response, the Chief Executive
confirmed it was not the current position but the outcome that the Council was
striving to achieve.  The Executive Director Education, Housing and Communities
advised while there were a number of contributing factors that affect high
performance in schools, the particular outcome related to being driven from an asset
base.      
In response to a question from Councillor Stuart seeking clarification on whether the
Council is confident it is achieving the correct balance between efficiency and
meeting outcomes for the residents of Moray, the Executive Director Education,
Housing and Communities confirmed user groups for leisure services have been
created so they can be consulted with in order to involved them in the future design of
the services and the same approach will be used for the library service.  
Following consideration the Committee unanimously agreed to note the Council's
performance in terms of a corporate overview of benchmarking results.  
Councillor Colyer left the meeting during discussion of this item.  
15.         Guidance on Agenda Items 
The meeting had before it a report by the Executive Director Finance, Strategy and
Transformation seeking approval of guidance for the identification of ad-hoc agenda
items for the Committee.  
In response to a question from Councillor Warren asking if safeguards are in place to
ensure that legitimate scrutiny requests are not filtered out by Council officers, the
Head of Governance confirmed all requests would be filtered by Corporate
Leadership Team to determine whether requests are possible.  He also advised
Page 11

Page 12

members have other mechanisms within the Standing Orders such as Notices of
Motion or Written Questions to bring forward issues for consideration.  
As a follow up question, Councillor Warren asked if a written explanation could be
provided with reasons where a thematic review proposal is submitted by a member
but not progressed with details of an alternative route to take forward.  The Chair
advised any proposals submitted in line with the guidance should be accepted by
officers.  The Chief Governance Officer confirmed any decision taken has an
explanation and suggested adding a sentence to the guidance under delegated
powers to that effect to ensure a written explanation is provided to members.  
Following consideration and there being no one otherwise minded, the Committee
unanimously agreed to approve the Guidance for Agenda Item Submissions
document attached as Appendix 1 to the report, with the addition of the suggested
amendment by the Chief Governance Officer.  
16.         Grant Thornton - Audit progress report and sector updates 
The meeting had before it a report by the Executive Director Finance, Strategy and
Transformation informing the Committee of the progress of the Council's External
Auditor on delivering their responsibilities.  
Following consideration the Committee unanimously agreed to note the audit
progress report and sector updates.  
17.         Annual Governance Statement 
The meeting had before it a report by the Chief Executive providing Committee with a
copy of the Council's Annual Governance Statement for 2025/26 for review and
approval.  
Following consideration the Committee unanimously agreed to note the draft Annual
Governance Statement provided as Appendix 1.   
Page 12

Page 13

Report to: Audit and Scrutiny
Committee 
Meeting Date: 29 September 2026            
Report by: Service Manager Internal Audit and Risk      
Author: Dafydd Lewis Contact Email: dafydd.lewis@moray.gov.uk 
Subject: Internal Audit Section Update Report 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider an update on the work of the Internal Audit
Section.  
1.2  This report is submitted to Committee in terms of Section III (I) (2) and (8) of the Council’s
Scheme of Administration relating to consideration of reports from the Council’s Internal
Auditor and monitoring delivery of the audit service through receipt of quarterly reports on
ork carried out by Internal Audit.  
2.  SUMMARY  
2.1  Global Internal Audit Standards requires the Service Manager Internal Audit and Risk to
prepare and present reports to committee on internal audit’s activity, performance relative
to its Audit Plan and any other relevant matters. 
2.2 This report provides an update on audit activity and projects progressed since the last
meeting. 
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee considers and notes the contents of this report,
seeking clarification on any points.   
Dafydd Lewis
Service Manager Internal Audit and Risk 
4.  BACKGROUND AND CONTEXT 
Grampian Valuation Joint Board 
Item 5.
Page 13

Page 14

4.1 The Internal Audit Section of Moray Council provides an internal audit service to the
Grampian Valuation Joint Board. The Joint Board’s financial systems align with those of the
Council, but an annual internal audit review of testing transactions specific to the
Assessor’s Service is required to provide assurances for the separate annual financial
statements the Board must prepare and publish. It is pleasing to report that based on the
audit work completed, reasonable assurance can be placed on the adequacy and
effectiveness of the system of internal financial control established within the Assessor’s
Service for 2025/26. 
Internal Audit Plan 2027/28 
4.2 Preparation for the Audit Plan for 2027/28 has started. Internal Audit’s approach to annual
audit planning is risk-based, with all areas subject to audit review contained within an
‘audit universe.’ The audit universe is reviewed and updated on an ongoing basis to include
all significant activities and systems. 
4.3 The Local Authority Accounts (Scotland) Regulations 2014 require that “a local authority
must operate a professional and objective internal auditing service in accordance with
recognised standards and practices in relation to internal auditing.” The standards
adopted by all Scottish councils are the Global Internal Audit Standards, developed by the
Chartered Institute of Public Finance and Accountancy (CIPFA) and the Chartered Institute
of Internal Auditors (CIIA). In accordance with the Global Internal Audit Standards (GIAS),
the Service Manager Internal Audit and Risk is responsible for preparing the Annual
Internal Audit Plan. However, consultation on projects for review will be undertaken with
Senior Officers, Members of this Committee and the Council Leader. 
4.4 In accordance with GIAS, local authorities are required to undertake an External Quality
Assessment (EQA) of their internal audit function at least once every five years. Through
the Council’s membership of the Scottish Local Authorities Chief Internal Auditors’ Group
(SLACIAG), there is an opportunity to participate in a reciprocal arrangement whereby
each internal audit service undertakes a review of another council and in turn, receives a
corresponding review.  The Council has previously adopted this approach. The findings of
the most recent EQA, undertaken by Perth and Kinross Council, were reported to this
Committee on 11 September 2024 (para 10 of the minute refers).  While the Council could
alternatively procure an independent EQA, this approach would incur a significant
financial cost. Following consultation with the Chair of the Audit and Scrutiny Committee,
Chief Executive and the Chief Governance Officer, it is considered that participation in the
reciprocal arrangement represents the most cost-effective option and delivers best value
for the Council and its partner organisations. To facilitate this approach, provision will
need to be made within a future Annual Internal Audit Plan for the allocation of audit days
to undertake an EQA review of another Scottish local authority. 
Internal Audit Plan Update
4.5 The Audit Plan establishes the annual priorities of the Internal Audit Service and outlines
how these align with the Council’s wider strategic objectives. Appendix 1 provides an
update on the progress made by the Internal Audit Section in delivering the planned audit
projects, as well as the follow-up reviews to be undertaken during 2026/27.   
Follow Up Reviews
4.6 Internal audit reports are regularly presented to Members detailing audit findings and
management responses to recommendations, including agreed implementation dates.
Page 14

Page 15

Internal Audit also undertakes follow-up reviews to provide assurance that agreed
recommendations have been implemented. Details of the completed follow-up reviews
are provided below:   
4.7 
Emergency Planning 
An audit of the Council’s emergency planning arrangements was previously undertaken.
The Council has a statutory responsibility to assess risks, prepare for emergencies and
undertake exercises in relation to incidents such as flooding, severe weather, pandemics
and other events that could have a significant impact on the community. Effective
emergency planning is a key element of the Council’s governance and resilience
framework, ensuring that critical services can be maintained and recovered in the event of
a major incident. The audit identified a number of recommendations and a follow-up
review was subsequently undertaken to assess the progress made in implementing the
agreed actions. The outcome of that review was reported to this Committee on 25 March
2026 (para 6 of the minute refers). However, a further follow-up review was required due to
one outstanding recommendation relating to the submission of an Annual Report to
Members detailing emergency planning activities undertaken during the year and those
planned for the forthcoming period. A further follow-up review has now been completed
and I am pleased to report that the outstanding recommendation has been implemented.
An Emergency Planning Annual Report was presented to Council on 6 May 2026 (para 12 of
the minute refers). 
4.8 
Food Standards Scotland Guidelines 
Internal Audit previously reviewed the systems and procedures used by the Council’s
Environmental Health Service to evaluate compliance with the Food Law Code of Practice
(Scotland), as set by Food Standards Scotland. Local authorities are required to monitor
compliance with food hygiene and standards legislation on behalf of Food Standards
Scotland. In 2019, the Food Law Code of Practice (Scotland) introduced a Food Law
Rating System, under which local authorities classify all food business operators within
their area into defined categories.  These ratings determine the frequency and level of
intervention required to assess compliance with food safety standards. The original audit
report included several recommendations and a follow-up review was undertaken to
assess their implementation.  This was reported to this Committee on 25 March 2026
(para 6 of the minute refers). However, a further follow-up review was required as one
recommendation remained outstanding relating to the review and where necessary,
updating of policies and procedures to ensure they remained current and applicable. I am
pleased to report that the policies and procedures identified during the audit have now
been reviewed and updated where necessary by the Service. 
4.9 
Children's Services Social Care Commissioning  
A further follow-up review has been undertaken to assess the implementation of a
recommendation arising from a previous audit of the arrangements for commissioning
children’s social care services. The original audit, reported to this Committee on 14
February 2024 (para 7 of the minute refers), evaluated the key controls in place within
Children’s Services relating to the external commissioning of social care provision. This
included contracts for preventive support, restorative services, residential care and out of
area residential placements, necessitated by the limited availability of specialised
provision within the Moray locality. The audit testing undertaken included a review of
commissioning strategies and procedures, an evaluation of financial monitoring
arrangements and an assessment of the effectiveness of contract management and
Page 15

Page 16

4.10 
4.11 
4.12 
monitoring processes.   This follow-up review found that the outstanding recommendation
relating to the implementation of a Commissioning Strategy for social care has been
substantially implemented, with the Strategy having been developed and agreed by senior
management; however, at the time of this review, it was still awaiting formal approval by
the Board. The development of the Commissioning Strategy represents a significant
improvement to the control framework, providing a structured approach to the planning,
commissioning and monitoring of social care services. This will help ensure that future
service provision is aligned with the needs of communities, supports strategic objectives
and facilitates the effective use of resources. 
Keith Grammar School
A further follow-up review has been undertaken at Keith Grammar School to evidence the
implementation of an outstanding recommendation, specifically to confirm that no pre-
signed cheques are maintained and that a new School Fund bank account has been
opened.   The audit of the financial and administrative arrangements at Keith Grammar
School was reported to this Committee on 25 March 2026 (para 6 of the minute
refers).  The scope of the original audit covered the Devolved School Management
Scheme, focusing on the allocation and management of funding within the School. The
audit also examined whether non-payroll expenditure complied with Financial Regulations
and Procurement Guidelines. In addition, testing was undertaken to ensure that
appropriate accounting arrangements were in place for the management of School Fund
monies. The follow-up review has confirmed that a new School Fund bank account has
now been opened and no pre-signed cheques were noted. However, the transfer of the
balance from the previous bank account had not yet been undertaken at the time of the
follow-up review but is scheduled to take place on 20 August 2026, as confirmed by the
new banking provider. Following completion of the transfer, the previous bank account will
be closed. 
Levelling Up Fund
A follow-up review has been undertaken to assess the implementation of
recommendations arising from a previous audit of the management of the Levelling Up
Fund, which was reported to this Committee on 25 March 2026 (para 7 of the minute
refers). The Levelling Up Fund is a UK Government initiative aimed at reducing regional
inequality. Moray Council was awarded £18.29 million in November 2023 to support town
centre regeneration, transport improvements and cultural projects, with the Council
acting as the accountable body responsible for financial compliance, procurement and
reporting to the UK Government. The scope of the original audit covered the processes
established to support governance and administrative arrangements relating to financial
management, risk management, stakeholder engagement and performance monitoring.
The follow-up report, confirming that all recommendations have been implemented, is
provided in Appendix 2. As part of the funding requirements, the Internal Audit Section is
required to undertake reviews of the management of the Levelling Up Fund. A further audit
will be included in next year's Audit Plan to provide ongoing assurance that project delivery
is being undertaken in accordance with the terms and conditions of the Fund award. 
Governance arrangements to prevent Fraud and Corruption
An audit of Moray Council’s and Moray Integration Joint Board’s governance arrangements
for preventing fraud and corruption was reported to this Committee on 20 November 2024
(para 8 of the minute refers). The review used CIPFA’s Code of Practice on Managing the
Risk of Fraud and Corruption to inform the audit testing undertaken. The audit was
Page 16

Page 17

4.13
delivered in partnership with the internal audit services of NHS Grampian and
Aberdeenshire/ Aberdeen City Councils. This collaborative approach supported a more
comprehensive and coordinated review, drawing on shared expertise and reflecting the
integrated nature of service delivery across Council and NHS systems. The audit identified
opportunities to further strengthen coordination and clarify responsibilities for fraud
investigations across partner organisations, as well as improving the Council’s counter-
fraud arrangements through the enhanced use of data analytics and more proactive audit
activity.  The follow-up report, enclosed in Appendix 3, confirms that all agreed
recommendations have been implemented. 
Complex and Challenging Behaviour
An audit of the Complex and Challenging Needs Service was reported to this Committee
on 19 November 2025 (para 8 of the minute refers). The Service provides care and
assistance to individuals with complex needs within purpose-built facilities in Elgin and
Lhanbryde, as well as in their own homes across Moray. The audit reviewed the systems
and procedures for the administration of the Service and the operational and financial
arrangements in place to assist individuals in managing their personal funds.  A follow-up
review has now been undertaken and it is pleasing to note the progress made in
implementing the recommendations. However, a further review will be required, as some
recommendations have not been fully implemented. The follow-up report is enclosed in
Appendix 4.  
5.  PROPOSALS  
5.1  It is recommended that Committee agree to note the progress made by Internal Audit in
the period from 18 June 2026 to 29 September 2026. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  ×
Policy and Legal  ×
Financial  ×
Risk × 
Staffing  ×
Best Value and Transformation × 
Property  ×
Information Communications Technology/Digital     ×
Equalities. Social Inclusion and Economic Impact   ×
Climate Change and Biodiversity Impact  × 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans.
Page 17

Page 18

a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
No implications directly arising from this report.  
6.4  Financial 
No implications directly arising from this report. 
6.5  Risk
The independent review of selected systems and procedures mitigates  the risks
associated with inadequate or ineffective control procedures. 
6.6  Staffing
No implications directly arising from this report. 
6.7  Best Value and Transformation
Internal audit work supports good governance and the delivery of efficient services. 
6.8  Property
No implications directly arising from this report. 
6.9  Information Communications/Technology/Digital Property
No implications directly arising from this report. 
6.10 Equalities, Social Inclusion and Economic Impact     
No implications directly arising from this report.        
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Page 18

Page 19

Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
There are no direct equalities, social inclusion or economic impacts arising from this report.
However, the work of Internal Audit contributes to the effectiveness of governance, risk
management and control arrangements across the Council, which support the delivery of
equitable, inclusive and sustainable outcomes for communities. 
6.11 Climate Change and Biodiversity Impacts 
No implications directly arising from this report. 
7.  CONSULTATION  
7.1  There have been no direct consultations during the preparation of this report.  
8.  BACKGROUND PAPERS  
8.1  None   
Page 19

Page 20

APPENDIX 1
Internal Audit Annual Work Programme- 2026/27
Update Report
CORE SYSTEM REVIEWS
Auditable Area Type of coverage Status/ Comments
Payroll Continuous auditing to confirm the adequacy of the
systems and procedures for paying salaries. The
intention is to make further use of an auditing software
application in the analysis of data and the sample
selected for testing. 
Audit programmed to start in the next
quarter(s)
Procurement and Creditor
Payments
Continuous auditing of samples of non-payroll
expenditure to test compliance with procurement and
payment processing regulations. An auditing software
application in the analysis of data and the sample
selected for testing will be used. Review will include
separate analysis of expenditure processed through the
Council and Moray Integration Joint Board 
Fieldwork Work Completed
Third Party and Strategic
Procurement (Topical
Requirement)
In accordance with the Global Internal Audit Standards
(GIAS), an audit will be undertaken to assess the
governance, risk management and control
arrangements in place to ensure a consistent and
comprehensive approach to managing third-party
relationships. The GIAS User Guide will inform the
development of the detailed audit scope and testing for
this review. 
Draft Report Issued
Cyber Security   
(Topical Requirement)
In accordance with the Global Internal Audit
Standards (GIAS), an audit of Cyber Security will be
undertaken. This will include a review of the controls
in place to identify and assess potential threats to
the Council’s ICT systems and to evaluate how
Draft Report Completed
Page 20

Page 21

these threats are being managed. The GIAS User
Guide will be used to develop the detailed audit
scope and testing for this review. In addition,
consideration will be given to the ‘key lessons’ and
recommendations outlined in an Accounts
Commission report regarding a cyber attack at
Comhairle nan Eilean Siar.
Insurance A review to provide assurance that the Council has
effective and robust insurance procedures,
ensuring that appropriate cover is in place and that
processes are clearly defined and consistently
followed.
Audit programmed to start in the next
quarter(s) 
Value Added Tax This audit will assess the adequacy and
effectiveness of the Council’s arrangements for
managing VAT compliance and reporting. It will
review the processes for VAT treatment of income
and expenditure, accuracy of VAT returns and
adherence to HMRC regulations. 
Draft Report Completed 
Global Internal Audit Standards-
Self Assessment
The Global Internal Audit Standards (GIAS) require
an annual self-assessment as part of a continuous
quality assurance and improvement program to
ensure that the internal audit function conforms to
the standards. This assessment will involve
reviewing the Internal Audit Section’s procedures
and processes against the GIAS to identify areas for
improvement and to inform a Quality Assurance and
Improvement Plan (QAIP). 
Ongoing review 
SERVICE REVIEWS
Page 21

Page 22

Auditable Area Type of coverage Status/ Comments
Moray Growth Deal   An audit will be undertaken of the governance and
administrative procedures within the Council for the
management of the Moray Growth Deal. The scope
will include a review of partnership working
arrangements, financial management, and the
measurement of success criteria.
Audit programmed to start in the next
quarter(s) 
Environmental Services - Roads
Maintenance (Response
Repairs) 
This audit will assess the effectiveness of the Roads
Maintenance Response Repairs, focusing on how
reactive issues are identified, prioritised and
resolved. The scope will include a review of the work
order management system, costing arrangements
and performance monitoring against service
standards.
Fieldwork Work in progress
Elgin Neighbourhood Board  This audit will assess the governance and
accountability arrangements of the Elgin
Neighbourhood Board in delivering local priorities.
The review will include an assessment of reporting
arrangements and compliance with relevant
policies and funding requirements.
Fieldwork Work in progress
Education – Secondary School  An establishment visit to review the financial and
administrative arrangements of a secondary school
will be undertaken as part of the cyclical review. 
Audit programmed to start in the next
quarter(s) 
Climate Change and
Sustainability
The objective of this audit is to review the
effectiveness and efficiency of the Council’s
arrangements for addressing climate change and
sustainability. The review will assess the adequacy
of governance, risk management, internal controls,
data reliability and compliance with statutory
climate change requirements. The audit scope will
Audit programmed to start in the next
quarter(s) 
Page 22

Page 23

be agreed with the Principal Climate Change Officer
before the review begins.
Housing Allocations  This audit will assess the Council’s housing
allocation processes, including compliance with
statutory requirements and the Housing Allocation
Policy. It will also assess the adequacy of record-
keeping, system access controls, and the
monitoring and reporting of allocation decisions to
ensure consistency and accountability.
Draft Report Issued 
MORAY INTEGRATION JOINT BOARD
Auditable Area Type of coverage Status/ Comments 
Self-Directed Support Option 1 This audit will assess the effectiveness of
governance, financial controls and monitoring
arrangements for Self-Directed Support Option 1,
where individuals receive a direct payment to
arrange their own care. The review will examine
eligibility assessments, support planning, payment
processing, and oversight of fund usage to ensure
compliance with relevant legislation and policies.
Fieldwork Work in progress 
Moray Integration Joint Board-
Financial Sustainability/
Governance
The review will assess the robustness of Moray IJB’s
financial planning and governance arrangements,
including the adequacy of its medium and long-term
financial strategies, alignment of resources with
strategic priorities and the effectiveness of its risk
management in addressing funding pressures. The
audit will also consider the clarity and transparency
of financial reporting to Moray Council and NHS
Grampian. 
Fieldwork Work in progress 
Block Contracts This audit will assess the effectiveness of Audit programmed to start in the next
Page 23

Page 24

governance, procurement, and contract
management arrangements for block contracts
within social care services. It will review how
contracts are awarded, monitored, and evaluated to
ensure value for money, service quality and
compliance with relevant legislation and Council
policies and regulations.
quarter(s)   
GRAMPIAN VALUATION JOINT BOARD
Auditable Area Type of coverage Status/ Comments
Grampian Valuation Joint Board In accordance with the Public Sector Internal Audit
Standards applicable to local government and joint
boards, an annual review is required of Grampian
Valuation Joint Board activities. 
Completed
VERIFICATION ACTIVITY
Auditable Area Type of coverage Status/ Comments
Year End Stock Valuations Verification of Year End Stock Verification for Building
Services/ Environmental Services/ Community Services
Stores.
Completed
Year end stock valuations agreed
Network Support Grant Ongoing certification requirements for the Network
Support Grant to Transport Scotland.
Ongoing
Half yearly audit certification
requirement. Last Network Support
Grant certified to 29/03/2026.
COUNTER FRAUD ACTIVITY
Auditable Area Type of coverage Status/ Comments
Counter Fraud Review  Annual review of the Council's counter fraud framework
to minimise the risk and impacts of fraud from internal
and external threats. The scope of the audit and testing
undertaken will be informed by frauds reported within
other organisations. 
Audit programmed to start in the next
quarter(s) 
National Fraud Initiative The National Fraud Initiative (NFI) is a data-matching Notification has been received that the
Page 24

Page 25

project conducted by the Cabinet Office on behalf of
Audit Scotland every two years. It involves a data-
matching exercise using information from various
Council systems, as well as data provided by other
councils and organisations. 
2025/26 National Fraud Initiative (NFI)
exercise has commenced. Services will
review and document data matches,
while Internal Audit will investigate
potential fraud, monitor progress, and
report on outcomes. Data uploads are
scheduled from 30 September 2026,
with matches expected to be available
for review by 18 December 2026. 
FOLLOW-UP REVIEWS DUE TO EVIDENCE IMPLEMENTATION OF OUTSTANDING RECOMMENDATIONS FROM
PREVIOUSLY ISSUED AUDIT PROJECTS – 2026/27*
* Additional follow-up reviews may be added depending on the implementation dates for recommendations detailed by services
Audit Undertaken Scope of Audit Review 
Pool Cars Scheme  The scope of this audit was to review systems and procedures in the management and use of pool
cars. Policies and procedures were checked to ensure they provide appropriate operating guidance
to officers in the booking and use of pool cars. The audit included a review of arrangements for
internal recharging to services and also exploration if further use of pool cars could provide
additional value for money opportunities to the Council.
Following the Public Pound  The Internal Audit Plan provided for a “Following the Public Pound” review to ensure proper
accountability for public funds used in delivering services, irrespective of the means of service
delivery. Councils fund Arms Length External Organisations (ALEOs) to provide important services
to the public. These funding arrangements are often more complex than purchase contracts for
goods or services but can bring both financial and operational benefits to councils.
Procurement and Creditor
Payments
(Council & MIJB) 
A review of payments made to suppliers of goods and services was undertaken. The purpose of the
audit was to confirm compliance with Financial, Authorisation, Procurement and Creditor Payment
Processing Regulations from the sample checked. The review formed part of the annual continuous
auditing activity of non-salary expenditure and is used to support the Service Manager Internal Audit
and Risk’s annual opinion of the Council’s internal control system.
Burials  The scope of this audit was to review systems and procedures in the administration of the Burial
Service. The included checking operational processes to ensure compliance with the Burial Grounds
Standard of Service. In addition, a check was also made to verify the costs of delivering the Service
and a review of systems and procedures for the collection of income
Page 25

Page 26

Commercial Refuse Collection  The Internal Audit Plan provided for a review to be undertaken of the controls in the management of
the Commercial Refuse Collection Service. The audit checked to ensure robust accounting
arrangements are followed, and appropriate agreements are in place with customers. 
Email Security The audit reviewed system controls, policies, and procedures governing the Council’s email system,
including arrangements for identifying risks and mitigating phishing threats. It also assessed
password management controls for Members’ access to Council networks and systems, as
requested by the Audit and Scrutiny Committee (22 November 2023-minute 6 refers).
Information Communications
Technology (ICT) Hardware
Assets
The audit reviewed the systems and policies for managing, recording, and disposing of ICT hardware.
Testing included verifying a sample of assets from the Inventory Register against their physical
location, reviewing processes for recovering equipment from leavers, and assessing physical
controls over access to servers and network equipment within Council buildings.
Out of Area Placements A review of the systems and procedures regarding adult services users who are out of the area, but
whose responsibility remains to meet their eligible care and support needs under the Care Act.
Non-Domestic Rates The audit reviewed the effectiveness of key controls within the non-domestic rates system, with a
particular emphasis on billing, collection and debt recovery arrangements. The scope focused on
assessing whether appropriate controls and procedures are in place to ensure demand notices are
issued accurately and on time to all liable ratepayers, that all income received through the various
payment channels is fully and promptly accounted for, and that proportionate and effective recovery
action is taken where amounts due remain unpaid.
Democracy and Governance The scope of the audit was to assess the effectiveness of the governance structures in supporting
the decision-making process. This included a review to ensure that key constitutional policies and
guidelines are up to date, clearly documented and readily accessible to both members and officers
Capital Plan Project Review The audit evaluated the governance and management of civil engineering–type projects within the
Capital Plan administered by the Consultancy Service. The review assessed the adequacy of
arrangements for identifying, appraising and approving projects for inclusion in the Capital Plan. The
audit also included detailed testing of a single project, from contract award through to completion
of works. This testing focused on compliance with the Council’s Financial Regulations, Procurement
Guidelines and the New Engineering Contract (NEC) Conditions of Contract.
Milnes High School The scope of this audit was to review the operation of the Devolved School Management Scheme in
terms of funding allocation and management at the school level. As part of the audit, the
arrangements for administering the School Fund were also reviewed. 
Secondary School Security This audit reviewed the security policies and procedures developed by the Education Service, as well
Page 26

Page 27

as guidance issued by individual secondary schools on the security of school premises and grounds.
Audit testing included the selection of a sample of schools for site visits, during which the
effectiveness of security controls was observed and evaluated against the relevant policies and
guidance.
Building Services – Planned  The audit reviewed how the Building Services planned maintenance programme is determined and
the contract management arrangements in place for these projects. This included the selection of a
sample of projects to verify that costs could be evidenced by appropriate supporting
documentation. Additional testing was also undertaken to assess the systems and controls in place
for the management and authorisation of overtime payments to officers. 
Building Services – Reactive  The scope of this audit included a review of the systems and controls in place for the administration
and management of reactive repairs within Building Services. This involved examining the process
from the identification and raising of repair requirements through to the completion of works, the
recharge of costs, and budget management.
Counter Fraud Review  The Annual Audit Plan included a review of the Council’s counter-fraud framework to assess the
effectiveness of arrangements for minimising the risk of fraud. The review was undertaken in
accordance with the CIPFA Code of Practice on Managing the Risk of Fraud and Corruption. The audit
included an examination of systems and procedures identified as having a higher risk of fraud, with
the scope of testing informed by fraud cases reported across the public sector and highlighted by
regulatory authorities, including Audit Scotland, through its Technical Bulletins.
Management of School Funds The scope of the audit was to review the arrangements in place for the management and
administration of school funds and to assess compliance with the Council’s School Fund
Regulations. The review also examined the governance and oversight framework operated by
Education Services. Testing was undertaken at a sample of primary and secondary schools to obtain
assurance that controls were operating effectively and consistently across the Council.
Treasury Management The scope of audit reviewed the procedures and controls in place to ensure compliance with the
borrowing and treasury management requirements set out in the CIPFA Code of Practice on Treasury
Management in the Public Services (2021) and the CIPFA Prudential Code for Capital Finance in
Local Authorities (2021).
Payroll The Internal Audit Plan includes an annual review to provide assurance on the adequacy and
effectiveness of the systems and procedures in place for the payment of salaries. The review
involved testing a randomly selected sample of starters, leavers and current employees to assess
the accuracy of pay calculations and to confirm that appropriate supporting documentation had
been retained and approved. In addition, checks were undertaken to confirm that deductions from
Page 27

Page 28

salary payments were made in accordance with statutory requirements or had been appropriately
authorised by employees. 
Page 28

Page 29

APPENDIX 2
1
Final Internal Audit Report (Follow Up)
Levelling Up Fund 
August 2026 
Distribution: Head of Growth, Planning & Climate
Service Manager Strategic Planning & Development
Levelling Up Fund Programme Manager
The Internal Audit Section provides Management with an opinion on the internal control environment
and also categories risk ratings for recommendations as high, medium or low (detailed explanation
provided in Appendix1). The audit recommendations for this review have been classified as follows
Assurance Level Risk Ratings for
Recommendations
Full
Priority 1 0
Priority 2 0
Priority 3 2
Confidentiality and Disclosure Clause
This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only
those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information
provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings
on the information and documentation provided and consequently, no complete guarantee can be given that this Report is
necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required.
This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian
Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party
who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation,
amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract,
reinterpretation, amendment and/or modification by any third party is entirely at their own risk.
Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities,
limitations and confidentiality.
Page 29

Page 30

Appendix 2 
2
Contents 
Page
Levelling Up Fund 
1. Introduction & Scope 3-4
2. Key Issues  4 
Detailed Report 
3. Findings/Recommendations 5-7
4. Management Response 6-8
5. Follow Up Review 6-8 
Appendices 
1. Audit Terms of Reference and Definitions 
2. Statement of Responsibility 
Page 30

Page 31

Appendix 2 
3
1. Introduction and Audit Scope 
The Annual Audit Plan for 2025/26 includes a review of the adequacy of
governance and administrative arrangements in place for managing the Levelling
Up Fund awarded to Moray by the United Kingdom (UK) Government. Moray
Council successfully secured funding for the Elgin City Centre Masterplan as part
of the third-round award of the Fund. This investment is intended to support the
regeneration of the town centre, upgrade local transport and enhance cultural and
heritage assets. 
The UK Government announced in November 2023 a Levelling Up Funding
award of £18,291,000 to the Moray Council. In December 2024, the Memorandum
of Understanding was signed between Moray Council and the UK Government,
agreeing on the terms, principles and practices for the administration and delivery
of Moray's Levelling Up proposals. Moray's Levelling Up Fund proposals centre
on three key projects; revitalising Elgin town centre by bringing disuses buildings
back into use and enhancing pedestrian access and the evening economy;
transforming a former mart site to enable commercial development, create a
multifunctional green space and improve links to the city centre; and reimagining
Cooper Park by restoring this valued community space with upgraded
recreational and leisure facilities for residents and visitors. Full delivery of the
programme is required by 31st March 2028. 
The Levelling Up Fund projects are governed through a collaborative structure
comprising a Project Board, Delivery Groups, and Moray Council. The Project
Board provides strategic leadership and oversight, ensuring that all funded
initiatives align with the objectives of the Levelling Up Fund. Community
representatives also sit on the Project Board, contributing local knowledge and
ensuring decisions reflect community priorities. Delivery Groups operate under
the guidance of the Project Board to implement individual projects. These groups
coordinate day-to-day activities, engage with contractors and partners, and
ensure projects progress on time and within budget. Moray Council acts as the
Accountable Body for the Fund, managing financial compliance, procurement,
and reporting obligations to the UK Government. 
The Council's Internal Audit Section will include days within the Annual Audit Plan
for work relating to the Levelling Up Fund, for the project duration. However, given
the proposed timescales, 2025 has primarily been a preparation year, involving
planning, design, legal agreements and consenting, while 2026 is scheduled for
the delivery of the projects. As the programme is at an early stage, the scope of
this audit has been limited to reviewing the processes established for governance
and administrative arrangements related to finance, risk, engagement and
performance management.   
At the time of the audit review at the end of September 2025, £8.1 million of
Levelling Up funding had been received from the UK Government. Expenditure
Page 31

Page 32

Appendix 2 
4
of £1.7 million had been incurred for project management, design fees, legal fees
and enabling works. The claims submitted to the UK Government to date have
been reviewed and checked to ensure alignment with the Financial Management
System (FMS). Audit testing has confirmed that the expenditure claimed to date
is eligible under the terms of the Levelling Up Funding Scheme, with submissions
made to the UK Government in a timely manner.  
The audit was carried out in accordance with the Global Internal Audit Standards
(GIAS). 
2. Key Issues 
• The audit found that, within the scope of the review, appropriate
arrangements have been developed for the governance and
administration required to deliver the funding objectives of the Levelling
Up Fund. The Project Board and focused Delivery Groups are meeting
in accordance with an agreed schedule, with effective engagement from
multidisciplinary officers and external stakeholders. Robust processes
for risk identification and management have been established, and
delivery plans have been developed in line with best-practice project
management standards. Systems for financial performance monitoring
are also in place, supported by established processes for reporting and
forecasting. 
• The audit noted the need for some administrative improvements
regarding the frequency of financial monitoring information and the
review of content related to the Levelling Up Fund published on the
Moray Council website. However, these issues are not considered
significant and are regarded as lower-level control requirements. 
Page 32

Page 33

5 
Findings/Recommendations - Levelling Up Fund 2025/26 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
1 Low It was noted that 2025 has been predominantly
a preparation period for the Levelling Up Fund,
with significant work undertaken in planning,
design, stakeholder engagement, legal
agreements and consenting, with delivery of the
projects planned for 2026. The My Moray
website is the official engagement platform for
the Moray Economic Partnership and is used to
provide updates on progress regarding
programme activities. However, information
about the Levelling Up Fund is also recorded on
a dedicated page of the Moray Council website.
The audit review noted that the information on
the Council's website contained outdated
content.   
The Moray Council website content
relating to Levelling Up Fund activities
should be reviewed and updated to ensure
it reflects the current status of the
programme.   
Page 33

Page 34

6 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Service Manager Strategic
Planning & Development
Yes 27/02/2026 The relevant pages on the Council website
are in the process of being updated. Going
forward into the main construction periods
of 2026 and 2027 detailed plans are being
discussed for continuous communications
with key stakeholders and for joined up
communications for the full regeneration
project portfolio, dependent on corporate
Communications resourcing. 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented N/A The Moray Council website content relating to Levelling Up Fund activities has
been appropriately reviewed and updated with a link added to the My Moray
website, which is the official engagement platform reporting programme
progress detail. Dedicated communications resourcing has been allocated to
the programme and is allowing increased reporting to stakeholders across
media channels, as programme delivery progresses. 
Page 34

Page 35

7 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
2 Low Levelling Up Fund (LUF) programme financial
spend and forecasting is compiled on request
for monitoring returns from the UK Government
and on quarterly capital plan reporting to the
Committee. The UK Government monitoring
returns were intended to be quarterly reports,
but have experienced slippage, with the last two
covering 6-month periods. Whilst financial
transactions are recorded when incurred within
the Council's Financial Management System,
there is no monthly compilation of a monitoring
statement, as is the standard budget monitoring
process for Council services. Full validation of
recorded transactions and agreement of
allocations therefore takes place covering a
longer time period, as it is currently undertaken
when formal reporting is required to the UK
Government. A monthly financial statement
review of expenditure would enhance the
control and monitoring process.   
A monthly financial statement should be
compiled and agreed between LUF
programme management and the
Accountancy Service to facilitate improved
financial monitoring arrangements. An up
to date summary of spend should be
continually available for management,
given the sizeable programme of work.   
Page 35

Page 36

8 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Service Manager Strategic
Planning & Development
Implemented 12/11/2025 The provision of monthly financial
statements by the Accountancy Service
has commenced since the completion of
the audit project. This ensures more
frequent monitoring, progressive code
alignment and consistency between the
financial ledger and Service records.     
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented N/A Monthly financial statements are now prepared by the Accountancy Section and
provided to the Levelling Up Fund programme management for scrutiny in
comparison to project progress, forecasts at completion, compensation events
and risks.  This allows assessment of whether projects remain on track and to
identify any funding pressures or opportunities at regular meetings of the
programme team and with finance support. The updated financial monitoring
process has been added to the Programme Financial Monitoring Policy. 
Page 36

Page 37

9 
Appendix 1 
AUDIT TERMS OF REFERENCE AND DEFINITIONS 
1. Audit Objectives 
1.1 The overall audit objective is to provide an objective independent opinion on
the adequacy and effectiveness of controls / processes.  
1.2 The audit will for each controls / process being considered: 
• Walkthrough the processes to consider the key controls; 
• Conduct sample testing of the identified key controls, and 
• Report on these accordingly 
1.3 All audit reviews are carried out in accordance with the Global Internal Audit
Standards (GIAS). 
2. Definitions for Auditing Opinions and Findings 
2.1 In order to assist management in using our reports: 
The Internal Auditor will categorise audit assurance opinion according to
their overall assessment of the risk management system, effectiveness of the
controls in place and the level of compliance with these controls and the action
being taken to remedy significant findings or weaknesses. 
Assurance
Level
System and Testing Conclusion
Full The controls tested are being consistently applied
Substantial There is evidence that the level of non compliance with some of the
controls may put some of the system objectives at risk.
Limited The level of non compliance puts the system objectives at risk.
None Significant non-compliance with basic controls leaves the system
open to error or abuse. 
2.2 Risk ratings for each recommendation is based on the following criteria: 
High Fundamental control weaknesses that require immediate attention by
management to action and mitigate significant exposure to risk
Medium Less critically important controls absent, not being operated as
designed or could be improved
Low Lower level controls absent, not being operated as designed or could
be improved.
Page 37

Page 38

10 
Appendix 2 
STATEMENT OF RESPONSIBILITY   
The responsibility for designing and maintaining a sound system of internal control to
prevent and detect fraud and other irregularities rests with management, with internal
audit providing a service to management to support them to achieve this objective.
The Internal Audit Section will assess the adequacy and effectiveness of the system
of internal control arrangements implemented by management and perform sample
testing on those controls in the period under review with a view to providing an opinion
on the extent to which risks in this area are managed. 
The Internal Audit Section will undertake testing with the objective of detecting
significant control weaknesses. However, the audit approach alone should not be
relied upon to identify all strengths and weaknesses in internal controls nor to find any
fraud or irregularity. Even sound systems of internal control can only provide
reasonable and not absolute assurance and may not be proof against collusive fraud. 
The matters raised in this report are only those that came to our attention during the
course of the audit review and are not necessarily a comprehensive statement of all
the weaknesses that exist or all improvements that might be made. Recommendations
for improvements should be assessed by management for their full impact before they
are implemented. The performance of the audit review undertaken should not be taken
as a substitute for management’s responsibilities for the application of sound
management practices. 
This report must not be disclosed to any third party or reproduced in whole or in part
without the written consent of the Moray Council’s Service Manager Internal Audit and
Risk. 
Page 38

Page 39

APPENDIX 3
1
Final Internal Audit Report (Follow Up Review)
Governance arrangements to
prevent Fraud and Corruption
June 2026
Distribution: Head of Service & Depute Chief Officer (MIJB)
Chief Governance Officer
Chief Financial Officer
Head of People, Change & Community Strategy
Service Manager Internal Audit & Risk
The Internal Audit Section provides Management with an opinion on the internal control environment
and also categories risk ratings for recommendations as high, medium or low (detailed explanation
provided in Appendix1). The audit recommendations for this review have been classified as follows
Assurance Level Risk Ratings for
Recommendations
Substantial
Priority 1 0
Priority 2 3
Priority 3 2
Confidentiality and Disclosure Clause
This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only
those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information
provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings
on the information and documentation provided and consequently, no complete guarantee can be given that this Report is
necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required.
This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian
Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party
who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation,
amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract,
reinterpretation, amendment and/or modification by any third party is entirely at their own risk.
Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities,
limitations and confidentiality.
Page 39

Page 40

Appendix 3 
2
Contents 
Page 
Governance arrangements to prevent Fraud and Corruption 
1. Introduction & Scope 3
2. Key Issues  3-4 
Detailed Report 
3. Findings/Recommendations 5-13
4. Management Response 5-14
5. Follow Up Reviews 6-14 
Appendices 
1. Audit Terms of Reference and Definitions 
2. Statement of Responsibility 
Page 40

Page 41

Appendix 3 
3
1. Introduction and Audit Scope 
The Annual Audit Plan for 2024/25 provides for a review of the Council and the
Moray Integration Joint Board (MIJB) governance arrangements to prevent
fraud and corruption.  The primary responsibility for preventing and detecting
fraud and corruption rests with management who should ensure adequate
systems of internal control, segregation of duties and proper authorisation
procedures. However, the Internal Audit Section does have a role in supporting
these arrangements by assessing the adequacy of these controls, and in
accordance with the Council’s Financial Regulations for the Service Manager
Internal Audit and Risk to investigate in consultation with the Depute Chief
Executive Education, Communities & Organisational Development irregularities
concerning finances, property, services or policies of the Council. The audit also
reviewed the arrangements for the investigation, preventing and detecting fraud
and corruption within the MIJB. The Council’s Service Manager Internal Audit
and Risk is also the Chief Internal Auditor of the MIJB. 
The CIPFA Code of Practice on Managing the Risk of Fraud and Corruption was
used as the template for developing an audit programme for this review. The
audit was also undertaken as part of a joint working arrangement with the
internal audit service providers of NHS Grampian, Aberdeen City and
Aberdeenshire Councils. This has allowed the sharing of knowledge and
agreement in the audit testing to ensure consistency and a more overarching
review of the Integration Joint Boards (IJBs) counter fraud and corruption
arrangements within the Grampian area. The IJBs deliver services through
officers and systems of the Council and NHS Grampian. Officers from the
Council and NHS Grampian will have access to the systems of both
organisations. It is hoped these joint working arrangements with the internal
audit service providers within Grampian will continue as it provides the
opportunity for a more cross-organisational review of the IJB’s risk management,
control and governance processes irrespective of NHS Grampian or Council
systems are used in the delivery of services. 
The audit was carried out in accordance with the Global Internal Audit Standards
(GIAS). 
2. Key Issues 
• The Global Internal Audit Standards require the Chief Internal Auditor
to provide an opinion on the overall adequacy and effectiveness of
the MIJB risk management, control and governance processes. MIJB
delegated services are delivered by Council and NHS Grampian
employed officers with access to systems of both organisations.
Responsibility for investigating fraud within the Council lies with the
Page 41

Page 42

Appendix 3 
4
Service Manager Internal Audit and Risk, but for NHS Grampian, it is
the responsibility of the NHS Counter Fraud Authority. It is
appreciated that the occurrence of fraud is rare, but consideration
should be given to developing a protocol between the Service
Manager Internal Audit and Risk in consultation with the Chief
Internal Auditor of Aberdeenshire/ Aberdeen City Councils and the
NHS Counter Fraud Authority. This should assist in providing greater
clarity and co-ordination of responsibility in the notification,
investigation and reporting of alleged frauds within the MIJB,
irrespective of whether the Council or NHS Grampian employs the
officer delivering the delegated service. 
• The CIPFA Code of Practice on Managing the Risk of Fraud and
Corruption requires that an “organisation should make arrangements
for appropriate resources to support the counter fraud strategy”. This
includes the need to detect fraud through data and intelligence
analysis. The staff resources of the Internal Audit Section are limited,
but consideration should be given to including a project within the
Annual Internal Audit Plan to review Council systems and practices
where fraud or irregularities have occurred in other organisations.
The testing undertaken should make use of data evaluation software
in the analysis of information, and a review of fraud cases and other
irregularities reported within the media, Audit Scotland Technical
Bulletins and participation in the Scottish Local Authority
Investigator's Group. 
Page 42

Page 43

5 
Governance arrangements to prevent Fraud and Corruption - 2024/25 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
1 Medium A review of the Council’s policy framework which
supports a counter fraud strategy, noted a range of
policies to inform officers in their conduct and
responsibilities as employees. These policies also
protect officers from false allegations of fraud or
corruption. However, the audit review noted that the
Code of Conduct for Employees and the Policy on
Outside Employment had not been reviewed for a
number of years. It is appreciated that both the Code
of Conduct for Employees and the Policy on Outside
Employment detail best practices and are still
relevant; however, both documents should be
reviewed and if required updated.
The Code of Conduct for Employees and the
Policy on Outside Employment should be reviewed
and if required updated. In addition, future dates of
review should thereafter be agreed. 
Management Response
Responsible Officer Accepted
(Yes/ No)
Timescale for
Implementation
(Date Required)
Agreed Management Action/Management Comment
Service Manager
Organisational Development
& Change
Yes 31/03/2026 The employment policy framework is reviewed annually, resulting
in agreement on the priorities for policy review according to a
range of factors, such as changed legislation. The Code of
Conduct for Employees and the Policy on Outside Employment
remain appropriate and have not been identified as a priority for
updating; however, they will be included in the annual plan for
policies review for 2025/26.
Page 43

Page 44

6 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented  N/A The Code of Conduct for Employees has now been reviewed, updated, and approved by
the Corporate Committee on 26 May 2026. The updated Code of Conduct incorporates
the Policy on Outside Employment.     
Page 44

Page 45

7 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
2 Low It was noted that the Council’s website included
details on reporting allegations of potential fraud to
the Internal Audit Section. However, reference is
made specifically to the reporting of Housing and
Social Security Benefits fraud, as this used to be the
most significant area of allegations received for
investigation. A review of the wording used within
the Council’s internet site should be undertaken, as
a need to report a potential fraud may relate to any
service area of the Council. In addition, research
noted online fraud reporting function within other
Local Authorities as an additional method for an
individual to report an allegation of fraud. 
Current wording used within the Council’s
internet site for reporting an allegation of fraud
should be reviewed and updated. In addition,
consideration should be given to the
development of an online reporting function as
an additional method for an individual to raise
a concern of fraud to the Council. 
Management Response
Responsible Officer Accepted
(Yes/ No)
Timescale for
Implementation
(Date Required)
Agreed Management Action/Management
Comment
Service Manager Internal
Audit & Risk 
Yes 31/03/2025 The information on the Council’s website for reporting fraud
will be reviewed and updated.  The timescale for
implementation of this recommendation has been set at 31
March 2025 due to the need to update web pages and
develop an online fraud reporting function, which requires
support from the ICT Section. 
Page 45

Page 46

8 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented N/A Information relating to fraud reporting on the Council’s website has been reviewed
and updated. The revised webpage now includes an online reporting facility for
suspected fraud.   
Page 46

Page 47

9 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
3 Low As part of the audit planning of projects to be included
within the Annual Audit Plan for 2023/24, a joint
working arrangement was agreed with the internal
audit service providers of NHS Grampian, Aberdeen
City and Aberdeenshire Councils to review the
Integration Joint Boards governance arrangements to
prevent fraud and corruption. This has allowed for a
more overarching review to be undertaken. As part of
the joint audit working arrangement, this has also
enabled the sharing of knowledge and information.
The Financial Regulations of the MIJB were updated
last year to include revised wording for reporting and
investigating a suspected irregularity. However, it was
noted that our neighbouring Councils had developed
a “Counter Fraud Process” detailing best practices to
follow in assessing a referral and investigating fraud.
The occurrence of fraud is rare and the nature of each
investigation can vary in nature, but consideration
should be given to reviewing and if required, adapting
this procedural document within Moray. 
Consideration should be given for the
Internal Audit Section to develop a “Counter
Fraud Process” procedure. 
Page 47

Page 48

10 
Management Response
Responsible Officer Accepted
(Yes/ No)
Timescale for
Implementation
(Date Required)
Agreed Management Action/Management
Comment
Service Manager Internal
Audit & Risk 
Yes 30/11/2024 The “Counter Fraud Process” already developed by a
neighbouring Council will be used to prepare a similar
procedural guidance document for the Moray Council.
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented N/A A ‘Counter Fraud Process’ procedural document has been developed and agreed for
use within the Internal Audit Section to support investigations into irregularities. 
Page 48

Page 49

11 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
4 Medium The Council’s Service Manager Internal Audit and
Risk is the appointed Chief Internal Auditor for
delivering an internal audit service to the MIJB. MIJB
delegated services are undertaken by Council and
NHS Grampian officers and systems. Officers of
both the Council and NHS Grampian are required to
use the systems of each organisation to deliver
services. The Service Manager Internal Audit and
Risk is responsible for investigating suspected
irregularities within the Council, and the NHS
Counter Fraud Authority investigates NHS
Grampian's allegations of fraud. However, an issue
may occur if an officer employed by the Council
commits fraud involving an NHS system and vice-
versa as to whether the allegation within the MIJB
should be investigated by the Council’s Service
Manager Internal Audit and Risk or the NHS
Counter Fraud Authority. The nature of the fraud
may have a cross organisational implication
regarding access to information and the individual
officer's terms and conditions of employment from
each organisation. 
Consideration should be given to the Service
Manager Internal Audit and Risk, in
consultation with the Chief Internal Auditor of
Aberdeenshire and Aberdeen City Councils, to
discuss and if possible, agree on a protocol for
the notification, investigation and reporting of
alleged fraud within the Grampian IJBs with
the NHS Counter Fraud Authority. This may
require a “letter of understanding” detailing
agreed arrangements for the fraud
investigation. 
Page 49

Page 50

12 
Management Response
Responsible Officer Accepted
(Yes/ No)
Timescale for
Implementation
(Date Required)
Agreed Management Action/Management
Comment
Service Manager Internal
Audit & Risk 
Yes 30/11/2024 Contact will be made with the Chief Internal Auditor of
Aberdeenshire and Aberdeen City Councils to discuss
arranging a meeting with the NHS Counter Fraud Authority to
agree a protocol for investigating fraud within the Grampian
IJBs. 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented N/A Discussions have been held with NHS Grampian and a single point of contact has
been agreed to ensure a coordinated approach to investigating alleged irregularities
within the Integrated Joint Boards. This will help ensure that investigations are
undertaken by the appropriate organisation, irrespective of whether the officer is
employed by the Council or NHS Grampian. In addition, this approach will facilitate
any cross-organisational investigation requirements. 
Page 50

Page 51

13 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
5 Medium At a Special Meeting of the Moray Council on 28
February 2024, it was decided to reduce the
Internal Audit Section staffing budget by replacing
the Corporate Investigations Officer’s post with a
0.5 full-time equivalent. The remaining budget was
used to appoint an Assistant Auditor, but this
proved unsuccessful, with no suitable applicants.
The CIPFA Code of Practice on Managing the Risk
of Fraud and Corruption requires that an
“organisation should make arrangements for
appropriate resources to support the counter fraud
strategy” of the Council. This includes the need to
detect fraud through data and intelligence analysis.
The limited staff resources of the Internal Audit
Section are appreciated, but consideration should
be given to including a project within the Annual
Internal Audit Plan to review systems and practices
where fraud or irregularities have been reported
within other organisations. 
During this review, it was noted that a financial
fraud was reported in the media of an officer in
another Local Authority embezzling over £1 million
in council tax refunds. Further to consultation with
the Council’s Taxation Manager, additional controls
have been introduced to current operating
arrangements.
The Service Manager Internal Audit and Risk
should consider including a project within the
Annual Internal Audit Plan to review Councill
systems and practices where fraud has
occurred within other organisations.
Identification of the scope and testing to be
undertaken will be determined from a review of
fraud cases reported in the media, Audit
Scotland Technical Bulletins and participation
in the Scottish Local Authority Investigator's
Group. The use of information data evaluation
software should also be used in the analysis of
information and databases. 
Page 51

Page 52

14 
Management Response
Responsible Officer Accepted
(Yes/ No)
Timescale for
Implementation
(Date Required)
Agreed Management Action/Management
Comment
Service Manager Internal
Audit & Risk 
Yes 28/02/2025 A project will be included to support the Council’s and MIJB
counter fraud and corruption arrangements in the Annual
Internal Audit Plan. The scope of the audit and testing
undertaken will be determined from frauds reported within
other organisations. The use of IDEA data analysis software
will be further developed in the analysis of information used
for audit testing.
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented N/A A counter fraud review was undertaken as part of the Audit Plan for 2025/26 and was
reported to the Audit and Scrutiny Committee on 25 March 2026 (Item 9). The review
assessed governance arrangements, fraud risk identification, staff awareness,
internal controls, reporting procedures and collaboration with external bodies, in
accordance with best practice as set out in CIPFA’s Code of Practice on Managing
the Risk of Fraud and Corruption. A further counter fraud review has been
incorporated into the 2026/27 Audit Plan, which was presented to the Audit and
Scrutiny Committee on 25 March 2026 (Item 10). 
Page 52

Page 53

15 
Appendix 1 
AUDIT TERMS OF REFERENCE AND DEFINITIONS 
1. Audit Objectives 
1.1 The overall audit objective is to provide an objective independent opinion on
the adequacy and effectiveness of controls / processes.  
1.2 The audit will for each controls / process being considered: 
• Walkthrough the processes to consider the key controls; 
• Conduct sample testing of the identified key controls, and 
• Report on these accordingly 
1.3 All audit reviews are carried out in accordance with Global  Internal Audit
Standards (GIAS). 
2. Definitions for Auditing Opinions and Findings 
2.1 In order to assist management in using our reports: 
The Internal Auditor will categorise audit assurance opinion according to
their overall assessment of the risk management system, effectiveness of the
controls in place and the level of compliance with these controls and the action
being taken to remedy significant findings or weaknesses. 
Assurance
Level
System and Testing Conclusion
Full The controls tested are being consistently applied
Substantial There is evidence that the level of non compliance with some of the
controls may put some of the system objectives at risk.
Limited The level of non compliance puts the system objectives at risk.
None Significant non-compliance with basic controls leaves the system
open to error or abuse. 
2.2 Risk ratings for each recommendation is based on the following criteria: 
High Fundamental control weaknesses that require immediate attention by
management to action and mitigate significant exposure to risk
Medium Less critically important controls absent, not being operated as
designed or could be improved
Low Lower level controls absent, not being operated as designed or could
be improved.
Page 53

Page 54

16 
Appendix 2 
STATEMENT OF RESPONSIBILITY   
The responsibility for designing and maintaining a sound system of internal control to
prevent and detect fraud and other irregularities rests with management, with internal
audit providing a service to management to support them to achieve this objective.
The Internal Audit Section will assess the adequacy and effectiveness of the system
of internal control arrangements implemented by management and perform sample
testing on those controls in the period under review with a view to providing an opinion
on the extent to which risks in this area are managed. 
The Internal Audit Section will undertake testing with the objective of detecting
significant control weaknesses. However, the audit approach alone should not be
relied upon to identify all strengths and weaknesses in internal controls nor to find any
fraud or irregularity. Even sound systems of internal control can only provide
reasonable and not absolute assurance and may not be proof against collusive fraud. 
The matters raised in this report are only those that came to our attention during the
course of the audit review and are not necessarily a comprehensive statement of all
the weaknesses that exist or all improvements that might be made. Recommendations
for improvements should be assessed by management for their full impact before they
are implemented. The performance of the audit review undertaken should not be taken
as a substitute for management’s responsibilities for the application of sound
management practices. 
This report must not be disclosed to any third party or reproduced in whole or in part
without the written consent of the Moray Council’s Service Manager Internal Audit and
Risk. 
Page 54

Page 55

APPENDIX 4
1
Final Internal Audit Report (Follow Up Review)
Complex and Challenging Needs Service 
August 2026
Distribution: Service Manager Provider Services
Team Manager/Consultant Practitioner Complex and Challenging 
Needs
The Internal Audit Section provides Management with an opinion on the internal control environment
and also categories risk ratings for recommendations as high, medium or low (detailed explanation
provided in Appendix1). The audit recommendations for this review have been classified as follows
Assurance Level Risk Ratings for
Recommendations
Substantial
Priority 1 1
Priority 2 8
Priority 3 5
Confidentiality and Disclosure Clause
This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only
those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information
provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings
on the information and documentation provided and consequently, no complete guarantee can be given that this Report is
necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required.
This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian
Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party
who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation,
amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract,
reinterpretation, amendment and/or modification by any third party is entirely at their own risk.
Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities,
limitations and confidentiality.
Page 55

Page 56

Appendix 4 
2
Contents 
Page
Complex and Challenging Needs Service 
1. Introduction & Scope 3
2. Key Issues  3-4 
Detailed Report 
3. Findings/Recommendations 5-26
4. Management Response 6-27
5. Follow Up Review 7-27 
Appendices 
1. Audit Terms of Reference and Definitions 
2. Statement of Responsibility 
Page 56

Page 57

Appendix 4 
3
1. Introduction and Audit Scope 
The annual Internal Audit plan for 2025/26 includes a review of the Complex and
Challenging Needs Service. This service supports individuals with complex care
needs at purpose built facilities in Elgin and Lhanbryde, as well as within their
own homes across Moray. 
At the time of the audit, the care facility in Elgin provided support to four adults.
The accommodation consists of a large bungalow with shared living rooms, a
communal kitchen and a garden. The facility in Lhanbryde serves as the
administrative base for the service and supports eight individuals in separate,
purpose built accommodation, with access to a communal area used for social
activities. The overall budget for delivering the Complex and Challenging Needs
Service in 2024/25 was approximately £7.7 million. 
The scope of the audit was to review the systems and procedures for delivering
and managing the Complex and Challenging Needs Service, specifically at the
care facilities in Elgin and Lhanbryde. This was an audit of the administrative
arrangements, rather than an assessment of the quality of care provided. The
Care Inspectorate in Scotland, as the national regulatory body for care services,
is responsible for ensuring that care services meet the required standards. The
audit focused on reviewing policies, procedures, and operating practices in the
administration of the Complex and Challenging Needs Service, particularly in
relation to budget management and the arrangements for assisting people in
managing their personal funds. However, the audit did include a check to ensure
that Support Plans for individuals supported by the service were reviewed in
accordance with agreed timescales. 
The audit was carried out in accordance with the Global Internal Audit Standards
(GIAS). 
2. Key Issues 
• The Complex and Challenging Needs Service provides 24-hour
support to individuals with specific care requirements. The audit
found that the Service has a number of staff vacancies and as
with other care sectors, is experiencing difficulties in recruiting
officers. Analysis of payroll expenditure indicated that the majority
of officers are working additional overtime hours each week.
Random testing of overtime claims noted that some officers who
are supporting individuals are often working more than 60 hours
per week. The audit notes the demands on the Service and the
commitment of officers to support the care needs of individuals;
however, it does question the sustainability of current working
arrangements
Page 57

Page 58

Appendix 4 
4
• The Service also supports people at both care facilities in
managing their personal funds. Officers assist individuals with
payments for groceries, utilities and other living expenses.
Separate records are maintained for each individual and any cash
held on their behalf is stored securely. Documented guidelines
outline the procedures for officers in administering these funds;
however, these guidelines have not been reviewed or updated for
several years. Consideration should be given to transitioning from
a cash-based system to individual bank accounts, which would
allow for the introduction of additional controls.   
• This audit focused on the financial administration of the Complex
and Challenging Needs Service. However, it also included a
check to confirm that the Support Plans of individuals at both care
facilities had been reviewed in accordance with agreed
timescales. The audit found that the majority of care packages
sampled had not been reviewed for over a year. In accordance
with Health & Social Care Moray Eligibility Criteria Policy, there is
a requirement for a Social Worker/Community Care officer to
undertake annual reviews where support is provided to meet
eligible needs, or more frequently as a response to a significant
change in circumstances. 
Page 58

Page 59

5 
Findings/Recommendations - Complex and Challenging Needs Service 2025/26 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
1 High Officers of the Service support individuals with
complex care needs at the care facilities in Elgin
and Lhanbryde, as well as within their own
homes. A review of the staffing complement at
the time of the audit identified significant
vacancies. As with other social care providers,
the Service is experiencing difficulties in
recruiting officers. 
An analysis of payroll costs found that the
majority of officers employed within the Service
are working more than their contracted hours
each week. Approximately £750,000 was paid
in overtime during 2024/25. Audit testing of
individual overtime claims, undertaken to verify
accuracy and compliance with Financial
Regulations, revealed that some Support
Workers are regularly working in excess of 60
hours per week. While the audit acknowledges
the commitment of officers to meeting the needs
of individuals supported by the Service, it also
raises concerns about the sustainability of the
current working arrangements.
The ongoing recruitment campaign for
officers within the Complex and
Challenging Needs Service should be
maintained. Consideration should also be
given to exploring alternative approaches
to reduce the significant levels of overtime
currently worked by some officers. 
Page 59

Page 60

6 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Service Manager
(Provider Services) 
Yes Ongoing A short-life working group will be
established to seek solutions and support
the ongoing staffing challenges facing the
Service. Since the audit, there has been a
reduction in vacancies at Woodview from
19.1 FTE to 10.6 FTE (as of 1st October),
and at Barlink from 4.49 FTE to 0.45 FTE
for Support Workers and 1 FTE for a
Keyworker (as of 1st October). While the
appointment of new staff will not have an
immediate impact on reducing overtime,
due to the requirement for training and
shadow shifts, it is expected that, over
time, this will lead to a decrease in
overtime usage. In addition, a review of
staffing arrangements is ongoing to
identify improvements in service delivery.
The combination of recent staff recruitment
and a review of current service delivery
methods is expected to support a
significant reduction in overtime in the
future. This will be closely monitored by
senior management.
Page 60

Page 61

7 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Part Implemented 31/03/2027 The follow-up review found that the Service has made significant progress
through the implementation of a Change Management Plan. This has included
a comprehensive review of the staffing structure, including the regrading of
Support Worker posts. The expected outcomes of these changes include a
reduction in the Service's reliance on officer overtime to meet operational
demands. However, as the changes have only recently been implemented, the
follow-up review has been unable to evidence their impact on the use of
overtime. A revised implementation date of 31 March 2027 has been agreed
with the Service. 
Page 61

Page 62

8 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
2 Medium The audit reviewed a random sample of officers
overtime and travel/expenses claims to verify
their accuracy and ensure correct authorisation
in accordance with Financial Regulations.
Testing identified one case where an officer had
submitted an overtime claim for 13.75 hours
and a travel/expenses claim for 27 miles in
advance of the date the work was to be
undertaken. Further investigation found that the
officer had neither worked the planned
additional hours nor incurred the mileage
claimed, due to sickness absence. This is not in
compliance with Financial Regulations. The
officer has since reimbursed the overpaid
amount and the mileage claimed. The audit also
found that approximately one-third of all travel
claims submitted by the service were not dated
at the time of signing, either by the submitting
officer or the authorising officer. 
In accordance with Financial Regulations,
officers within the Complex and
Challenging Needs Service should be
reminded that claims for overtime and
travel/expenses must only be submitted
after the hours have been worked or the
mileage incurred. Additionally, all
travel/expenses claims must be dated at
the time they are signed by both the
submitting and authorising officers. 
Page 62

Page 63

9 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Assistant Managers 
Service Manager
(Provider Services) 
Yes 
Yes
30/09/2025 
31/03/2026 
All staff are to be informed, in accordance
with the Financial Regulations, of the
correct procedure for completing and
submitting travel and expense claims. In
addition, these requirements will be
reminded during Supervision and Team
Meetings 
Digital solutions will be explored with the 
Payroll Service for submitting expenses
claims. 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented  N/A  The follow-up review noted, from meeting minutes, that officers have been
reminded of the correct procedures for submitting travel and subsistence
claims. Management has also implemented additional verification controls to
review the accuracy of claims. Follow-up audit testing of a sample of travel and
subsistence claims submitted by officers within the Service identified no
discrepancies. 
Page 63

Page 64

10 
Part - Implemented  31/12/2027  It was noted that a new payroll software application is currently being
implemented, which will facilitate the electronic submission of claims. The
Service advised that the system is being rolled out on a phased basis, with
implementation within the Complex and Challenging Behaviour Service
scheduled for 2027/28. 
Page 64

Page 65

11 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
3 Medium A review was undertaken of non-staffing
expenditure made by the Complex and
Challenging Needs Service. This involved
testing a random sample of payments to
suppliers of goods and services and checking
to ensure compliance with Financial
Regulations and Procurement Guidelines. The
review found that mostly correct procurement
and authorisation processes had been
undertaken. However, an example was noted
where Guidelines had not been followed in the
procurement for the purchase and installation
of a bicycle shed to the value of £25,000. 
Officers involved in the purchasing of
goods and services should be reminded
of the need to comply with Financial
Regulations and Procurement
Guidelines. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Team Manager/Consultant
Practitioner Residential
Complex and Challenging
Needs
Yes  Implemented A grant was secured for the bike shed, and
all work was completed within the £25,000
grant allocation. Staff have been reminded
of the requirement to comply with the
Council’s Procurement Guidelines. 
Page 65

Page 66

12 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented N/A The follow-up review noted from the minutes of meetings within the Service
that officers have been reminded of the requirement to comply with Financial
Regulations and Procurement Guidance. 
Page 66

Page 67

13 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
4  Low Analysis of the Financial Management System
indicated that the overall budget for delivering
the Complex and Challenging Needs Service in
2024/25 was £7.7 million, with the majority of
expenditure related to staffing costs. It was
found that the staffing budget is regularly
reviewed to ensure accuracy and alignment
with the needs of individuals supported by the
Service. However, a number of other non
staffing budget headings that is not material in
value e.g. non domestic rates, utilities and ad-
hoc repairs had a budget allocation which did
not correspond to actual expenditure incurred. 
A financial “housekeeping” exercise
should be undertaken to review and adjust
the budget allocations for non-staffing
costs to better reflect current expenditure. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Team Manager/Consultant
Practitioner Residential
Complex and Challenging
Needs / Accountant
Yes 31/03/2026  The Service, in consultation with the
Accountancy Section, will review the non-
staffing budget to ensure it is more closely
aligned with actual expenditure. 
Page 67

Page 68

14 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Outstanding 31/03/2027 It is acknowledged that significant resources have been required to implement
the Change Management Plan detailed within Finding 1. The Service is
currently consulting with Accountancy to review non-staffing budgets and
ensure they are more closely aligned with actual expenditure. However, the
Service has advised that a revised implementation date of 31 March 2027 is
required to fully implement this recommendation. 
Page 68

Page 69

15 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
5 Medium The audit visit to the care facility in Lhanbryde
found that funds are held in both cash and within
a bank account of monies collected through
fundraising activities and donations. These
funds are intended for the benefit of the people
supported by the Service. The administrations
of these funds are similar to the requirements of
a Private Fund within a School. The audit
checked the income and expenditure activity of
these funds and undertook a reconciliation to
confirm the accuracy of the monies held to
supporting documentation. It is pleasing to
report that no discrepancies were noted.
However, there are no operating guidelines to
support officers in the administrative
requirements in the management of these
funds. 
Guidelines should be developed detailing
the administrative requirements in the
management and accounting
arrangements of monies held from
fundraising activities and donations. 
Page 69

Page 70

16 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Assistant Managers
(Woodview) 
Service Manager
(Provider Services)
Yes 
Yes
31/03/2026 
28/02/2026
A financial procedure will be developed for
the management and administration of
funds collected from events, donations,
and fundraising, as well as the
expenditures used to benefit individuals
using the service. This will include the
opening of a new bank account (where an
admin fee is not charged). 
A management panel will be established to
oversee and agree the allocation of funds. 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented 
Implemented
N/A 
N/A
Guidelines have been developed and are in operation detailing the
administrative requirements in the management and accounting arrangements
of monies held from fundraising activities and donations, 
The follow-up review confirmed that a management panel has been
established to oversee the allocation of funds generated through events,
donations and fundraising activities. 
Page 70

Page 71

17 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
6 Medium The audit review noted that officers at the care
facilities support individuals in the management
of their personal monies. Cash sums are stored
securely for individuals at the care facilities and
are used for purchases such as groceries, day
trips, utility bills and other living expenses.
Operating arrangements for administering
these funds are detailed within the Financial
Guidelines developed by the Service. The audit
reviewed these arrangements, including a
reconciliation of supporting documents to the
cash held for a sample of individuals. The
following points were noted: 
• Resident funds are administered in cash.
Records are maintained to evidence and
reconcile individual balances against the
monies held. However, it is considered
that the amounts of cash stored at the
care facilities for some individuals
exceed routine weekly expenditure
requirements.   
Consideration should be given to
implementing alternative methods for
managing the personal funds of
individuals, such as individual banking
arrangements. 
Page 71

Page 72

18 
• The Financial Guidelines document
detailing the administration
arrangements for individuals’ funds has
not been reviewed or updated since
2022.
The Financial Guidelines document for
administering individuals’ funds should be
reviewed and updated as required. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Service Manager
(Provider Services)/
Service Manager
(Learning Disability) /
Chief Financial Officer
(MIJB) 
Assistant Managers
(Woodview) 
Yes 
Yes 
31/03/2026 
30/09/2025 
A review will be undertaken to explore
alternative methods for managing the
personal funds of individuals, including
consultation with guardians, social work,
and Finance. 
The Financial Guidelines document for
administering individuals’ funds will be
reviewed and updated. A request will also
be submitted to Community Finance for
weekly cash uplifts, thereby reducing the
amount of funds held within the service 
Page 72

Page 73

19 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented 
Implemented
N/A 
N/A
The Financial Guidelines for administering individuals’ funds has been
reviewed and updated. 
The follow-up review noted progress in addressing the issues identified in the
original audit. The Service has explored the use of individual banking
arrangements for the management of funds held on behalf of individuals;
however, administrative challenges remain where appointeeship
arrangements are in place. Audit testing found a reduction in the amount of
cash held since the original review. In addition, revised operating
arrangements, including the increased use of purchasing cards, have reduced
reliance on cash transactions and strengthened the associated control
framework. 
Page 73

Page 74

20 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
7  Low The audit visit to the care facility at Lhanbryde
noted the provision of two petty cash accounts:
an Adult Services account with an imprest
amount of £250 and a Children’s and Young
Persons account with an imprest amount of
£120. The review found that the Adult Services
account was well managed and operated in
accordance with Financial Guidelines.
However, further to discussions with officers
indicated that greater use is now being made of
the purchasing card. The Children’s and Young
Persons petty cash account had not been used
since 2022. This account was initially
established to support a young person before
they turned 18 and transitioned into Adult
Services.   
Consideration should be given to closing
both the Adult Services and Children and
Young Persons petty cash accounts. 
Page 74

Page 75

21 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Assistant Mangers
(Woodview)
Yes  Implemented Petty cash has now been closed for both
services, and evidence of this closure has
been submitted to Internal Audit. 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented N/A The follow-up review has confirmed that both petty cash accounts have been
closed. 
Page 75

Page 76

22 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
8 Medium The audit included a review to ensure that
Support Plans for individuals at both care
facilities had been updated to confirm that care
and support continue to meet their needs and
agreed outcomes. It was found that the majority
of care packages sampled had not been
reviewed for over a year. This finding has also
been noted in other social care reviews to 
highlight the requirement for regular reviews of
Support Plans for individuals receiving services.
It is acknowledged that management at Health
and Social Care Moray are aware of this issue
and are progressing the necessary actions in
accordance with the Eligibility Criteria Policy,
which requires a Social Worker or Community
Care Officer to undertake annual reviews where
support is provided to meet eligible needs. 
Support Plans for users of the Complex
and Challenging Needs Service should
be reviewed at least annually in
accordance with the agreed policy. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Service Manager
(Learning Disability)
Yes 31/12/2025 All out-of-date support plans to be
updated.
Page 76

Page 77

23 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented N/A The follow-up review confirmed that all Support Plans for people using the
service had been reviewed and where required updated. 
Page 77

Page 78

24 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
9 Low The care facility at Lhanbryde has one
dedicated pool car that officers use to support
individuals within the community. It was noted
that the annual mileage used for this vehicle
was approximately 7,000 miles in 2024/25. A
previous audit of pool cars noted that best value
is obtained when comparing the cost of
purchasing and use of a pool car is achieved
when mileage in excess of 12,000 a year is
undertaken. Analysis of mileage claimed by
officers of the Service when using their personal
vehicles noted a cumulative total of
approximately 17,000 in 2024/25. Increasing
the use of the pool car may provide a financial
saving to the Service.  
Consideration should be given to
increasing the use of the available
dedicated pool car by officers of the
Service. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Assistant Managers
(Woodview)
Yes 31/01/2026 A review of the current pool car arrangements
will be carried out, and a more proactive
approach will be implemented for its use
during care and support visits outside of
Woodview, which currently incur a mileage
charge.
Page 78

Page 79

25 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented N/A The follow-up review noted that the Service now has access to a dedicated
pool car for undertaking care and support visits. Audit analysis of a sample
period of mileage claims submitted by officers within the Service found a
significant reduction in expenditure compared with the corresponding period in
2025. 
Page 79

Page 80

26 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
10  Low The care home facility at Lhanbryde operates
a closed-circuit television (CCTV) system as
an additional security measure for the
property. The use of CCTV requires
compliance with Data Protection Legislation,
including the completion of a Data Protection
Impact Assessment (DPIA). A DPIA is a
structured process that systematically
analyses the data protection risks associated
with CCTV systems. It was found that no DPIA
had been completed. 
Additionally, officers operating the CCTV at the
facility had not undertaken the necessary
training provided by the Council. It was also
noted that the location of the CCTV monitor
within the property is in an accessible area,
which is not in accordance with Data
Protection Legislation. 
A Data Protection Impact Assessment
(DPIA) should be completed for the care
home facility at Lhanbryde. 
All officers operating CCTV must
complete the Council’s CCTV training
module. The location of the CCTV monitor
within the property in Lhanbryde should
also be relocated to ensure that footage
can only be viewed by trained officers who
require access as part of their duties. 
Page 80

Page 81

27 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Assistant Managers
(Woodview) 
Assistant Managers
(Woodview)
Yes 
Yes 
Implemented 
Implemented 
DPIA for the CCTV system at Woodview
has been completed and approved. 
Training has been completed for all staff
with access to the CCTV system at
Woodview. In addition, access to the
CCTV monitor at Woodview is now
restricted. 
Follow Up Review
Implementation
Status
Revised
Implementation
Date 
Internal Audit Review Outcome
Implemented 
Implemented
N/A 
N/A
The follow-up review confirmed that a DPIA had been completed and approved
for the CCTV system at Woodview, Lhanbryde. 
It has been confirmed that all staff with access to the CCTV system have
completed the required training and that physical access to the CCTV monitor
is now restricted. 
Page 81

Page 82

28 
Appendix 1 
AUDIT TERMS OF REFERENCE AND DEFINITIONS 
1. Audit Objectives 
1.1 The overall audit objective is to provide an objective independent opinion on
the adequacy and effectiveness of controls / processes.  
1.2 The audit will for each controls / process being considered: 
• Walkthrough the processes to consider the key controls; 
• Conduct sample testing of the identified key controls, and 
• Report on these accordingly 
1.3 All audit reviews are carried out in accordance with Global Internal Audit
Standards (GIAS). 
2. Definitions for Auditing Opinions and Findings 
2.1 In order to assist management in using our reports: 
The Internal Auditor will categorise audit assurance opinion according to
their overall assessment of the risk management system, effectiveness of the
controls in place and the level of compliance with these controls and the action
being taken to remedy significant findings or weaknesses. 
Assurance
Level
System and Testing Conclusion
Full The controls tested are being consistently applied
Substantial There is evidence that the level of non compliance with some of the
controls may put some of the system objectives at risk.
Limited The level of non compliance puts the system objectives at risk.
None Significant non-compliance with basic controls leaves the system
open to error or abuse. 
2.2 Risk ratings for each recommendation is based on the following criteria: 
High Fundamental control weaknesses that require immediate attention by
management to action and mitigate significant exposure to risk
Medium Less critically important controls absent, not being operated as
designed or could be improved
Low Lower level controls absent, not being operated as designed or could
be improved.
Page 82

Page 83

29 
Appendix 2 
STATEMENT OF RESPONSIBILITY   
The responsibility for designing and maintaining a sound system of internal control to
prevent and detect fraud and other irregularities rests with management, with internal
audit providing a service to management to support them to achieve this objective.
The Internal Audit Section will assess the adequacy and effectiveness of the system
of internal control arrangements implemented by management and perform sample
testing on those controls in the period under review with a view to providing an opinion
on the extent to which risks in this area are managed. 
The Internal Audit Section will undertake testing with the objective of detecting
significant control weaknesses. However, the audit approach alone should not be
relied upon to identify all strengths and weaknesses in internal controls nor to find any
fraud or irregularity. Even sound systems of internal control can only provide
reasonable and not absolute assurance and may not be proof against collusive fraud. 
The matters raised in this report are only those that came to our attention during the
course of the audit review and are not necessarily a comprehensive statement of all
the weaknesses that exist or all improvements that might be made. Recommendations
for improvements should be assessed by management for their full impact before they
are implemented. The performance of the audit review undertaken should not be taken
as a substitute for management’s responsibilities for the application of sound
management practices. 
This report must not be disclosed to any third party or reproduced in whole or in part
without the written consent of the Moray Council’s Service Manager Internal Audit and
Risk. 
Page 83

Page 84

Page 84

Page 85

Report to: Audit and Scrutiny
Committee 
Meeting Date: 29 September 2026     
Report by: Service Manager Internal Audit and Risk      
Author: Dafydd Lewis Contact Email: dafydd.lewis@moray.gov.uk 
Subject: Internal Audit Review – Commercial Harbours 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The report advises Committee on an internal audit review completed for the               period from
18 June 2026 to 29 September 2026.  
1.2  This report is submitted to Committee in terms of Section III (I) (2) and (8) of the Council’s
Scheme of Administration relating to consideration of reports from the Council’s Internal
Auditor and monitoring delivery of the audit service through receipt of quarterly reports on
work carried out by Internal Audit.  
2.  SUMMARY  
2.1  This report provides details of the internal audit review of Commercial Harbours, which
was agreed for review within the Audit Plan.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee considers the contents of this report, seeks
clarification on any points noted and endorses the recommendations contained
within the report.   
Dafydd Lewis
Service Manager Internal Audit and Risk 
4.  BACKGROUND AND CONTEXT  
4.1  An audit was undertaken of the Council’s main commercial harbours at Buckie and
Burghead. Buckie Harbour is the principal commercial port, supporting fishing, cargo
handling and offshore renewable energy operations. Burghead Harbour primarily serves
inshore fishing vessels involved in the shellfish and squid sectors. The remaining Council
Item 6.
Page 85

Page 86

operated harbours at Cullen, Findochty, Hopeman, and Portknockie mainly serve the
leisure boating community, with a limited number of inshore fishing vessels and are
therefore outwith the scope of this audit.  
4.2  The review considered the management and financial performance of commercial
maritime activities. The objective of the audit was to assess whether appropriate controls
and arrangements are in place to support effective harbour operations. The audit also
examined wider aspects of harbour management, including governance, financial
oversight and asset maintenance. The detailed findings and recommendations from this
review are set out within the audit report in Appendix 1.  
5.  PROPOSALS  
5.1  It is recommended that Committee agree to note the progress made by Internal Audit in
the period from 18 June 2026 to 29 September 2026. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  ×
Policy and Legal  ×
Financial  ×
Risk × 
Staffing  ×
Best Value and Transformation × 
Property  ×
Information Communications Technology/Digital     ×
Equalities. Social Inclusion and Economic Impact   ×
Climate Change and Biodiversity Impact  × 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
Page 86

Page 87

☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
No implications directly arising from this report.  
6.4  Financial 
No implications directly arising from this report. 
6.5  Risk
The independent review of selected systems and procedures mitigates  the risks
associated with inadequate or ineffective control procedures. 
6.6  Staffing
No implications directly arising from this report. 
6.7  Best Value and Transformation
Internal audit work supports good governance and the delivery of efficient services. 
6.8  Property
No implications directly arising from this report. 
6.9  Information Communications/Technology/Digital Property
No implications directly arising from this report. 
6.10 Equalities, Social Inclusion and Economic Impact     
No implications directly arising from this report.        
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
Page 87

Page 88

JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
There are no direct equalities, social inclusion or economic impacts arising from this report.
However, the work of Internal Audit contributes to the effectiveness of governance, risk
management and control arrangements across the Council, which support the delivery of
equitable, inclusive and sustainable outcomes for communities. 
6.11 Climate Change and Biodiversity Impacts 
No implications directly arising from this report. 
7.  CONSULTATION  
7.1  There have been no direct consultations during the preparation of this report.  
8.  BACKGROUND PAPERS  
8.1  None   
Page 88

Page 89

APPENDIX 1
1
Final Internal Audit Report
Commercial Harbours 
May 2026
Distribution: Head of Operations & Environment
Service Manager – Property, Estates & Assets
The Internal Audit Section provides Management with an opinion on the internal control environment
and also categories risk ratings for recommendations as high, medium or low (detailed explanation
provided in Appendix1). The audit recommendations for this review have been classified as follows
Assurance Level Risk Ratings for
Recommendations
Substantial
Priority 1 0
Priority 2 4
Priority 3 3
Confidentiality and Disclosure Clause
This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only
those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information
provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings
on the information and documentation provided and consequently, no complete guarantee can be given that this Report is
necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required.
This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian
Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party
who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation,
amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract,
reinterpretation, amendment and/or modification by any third party is entirely at their own risk.
Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities,
limitations and confidentiality.
Page 89

Page 90

Appendix 1 
2
Contents 
Page
Commercial Harbours 
1. Introduction & Scope 3
2. Key Issues  4 
Detailed Report 
3. Findings/Recommendations 5-17
4. Management Response 6-18 
Appendices 
1. Audit Terms of Reference and Definitions 
2. Statement of Responsibility 
Page 90

Page 91

Appendix 1 
3
1. Introduction and Audit Scope 
The Internal Audit Plan for 2025/26 included a review of the Council’s Commercial
Harbours. The Council acts as the statutory harbour authority for six harbours,
serving both the leisure and commercial sectors. Buckie and Burghead are
classified as the Council’s primary commercial harbours, with the remaining
harbours predominantly serving the leisure market. The Moray Council has
inherited the statutory powers conferred by the Grampian Regional Council
(Harbours Order) Confirmation Act 1987 to manage, regulate and levy fees.
Buckie Harbour is the principal commercial port, providing services to the fishing
fleet and supporting cargo operations including timber, aggregates, foodstuffs
and fabricated steel, as well as increasingly servicing operations and
maintenance activity associated with offshore renewable energy. Burghead
Harbour primarily supports inshore vessels engaged in the shellfish and squid
industries. The remaining Council-operated harbours at Cullen, Findochty,
Hopeman and Portknockie mainly serve the leisure boating community, with a
limited number of inshore fishing vessels, and are therefore outwith the scope of
this audit. In 2025/26, operating costs for Buckie and Burghead Harbours were
approximately £940,000, with staffing costs and infrastructure maintenance
comprising the majority of expenditure. Income generated from service users,
rents and grant funding totalled approximately £1 million.  
The objective of the audit was to provide assurance that adequate controls are in
place to support the efficient and financially sustainable operation of harbour
activities, and that these arrangements align with relevant statutory obligations,
Council policies and recognised good practice. This included a review of key
income streams, including fish landing charges, import and export fees, pilotage
services, berthing applications and allocations, and the collection of income due
to the Council from berthing fees and harbour store rentals. The review also
considered income generated from ancillary services, such as the provision of
water and electricity supplies. 
The scope of the audit encompassed the key processes and controls associated
with harbour management, including strategic oversight, financial management,
asset maintenance, compliance with health and safety requirements, and risk
management. In particular, the audit considered roles and responsibilities for
harbour operations, the effectiveness of performance monitoring arrangements,
and the extent to which decision-making is supported by accurate and timely
management information.  
The audit was carried out in accordance with the Global Internal Audit Standards
(GIAS). 
Page 91

Page 92

Appendix 1 
4
2. Key Issues 
• The Council has statutory authority to manage and regulate its harbours;
however, there is currently no formal Terms and Conditions Agreement
in place to govern their use by service users. The audit acknowledges
that established practices are in place for the management and control
of harbour activities. However, it was noted that other local authorities
have implemented formal agreements to strengthen controls over
harbour access, safety requirements, charging arrangements and user
responsibilities. It is recognised that the Service is currently in the
process of developing a similar document, which is expected to enhance
transparency and provide a clearer framework for managing harbour
operations. Once finalised and implemented, this agreement will
improve governance by establishing consistent operating rules,
supporting the effective verification of charges, and enhancing
assurance over income and compliance. 
• Audit testing confirmed that income for Buckie and Burghead Harbours
is accurately recorded within the Council’s Financial Management
System, with no concerns identified in transaction processing. However,
an opportunity for improvement was identified regarding the alignment
of nominal budget headings with actual income streams. While it is
recognised that income levels may fluctuate, enhanced alignment would
strengthen financial monitoring and oversight. Income streams,
including pilotage charges, landing charges and berthing fees, are
processed through the Council’s invoicing system. Testing of a sample
of invoices confirmed that these were accurately raised and supported
by appropriate documentation. However, delays were identified between
the provision of services and the preparation and issue of invoices.
Management advised that these delays were due to staffing shortages;
remedial action has since been taken to improve invoicing timeliness. 
Page 92

Page 93

5 
Findings/Recommendations - Commercial Harbours 2025/26 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
1 Low Total income for Buckie and Burghead
Harbours was approximately £1 million for
2026/27. Analysis noted that the majority of this
income was from a combination of fishing-
related activities, commercial cargo handling,
and increasingly, offshore renewable energy
operations. Audit testing identified no issues
with the accurate recording of income within the
appropriate cost centres. However, an
opportunity to improve financial reporting
arrangements was identified. Improved
alignment of nominal budget headings with the
actual income streams received during the year
would enhance financial monitoring and
variance analysis. 
It is recognised that harbour income can be
variable and, in some instances, difficult to
predict due to fluctuations within the fishing
industry and increased activity associated with
offshore wind farm projects. However, greater
alignment of budgets with historical income
trends and expected income profiles may assist
Consideration should be given, in
consultation with the Accountancy
Service, to better align income budgets
with actual income streams.  Where
appropriate, consideration should also be
given to amalgamating subjective
headings.
Page 93

Page 94

6 
management in achieving improved budgetary
oversight and monitoring arrangements.
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Head of Operations &
Environment (in absence
of Service Manager
Harbours)
Yes  30/09/26 Work already underway to review phasing
and allocations 
Page 94

Page 95

7 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
2 Low As detailed within the previous finding, an
analysis of income was undertaken. It was
noted that Buckie Harbour records a nominal
income budget of less than £100 in respect of
receipts for the use of communal shower
facilities by visiting marine users. Discussions
with officers confirmed that charges for using
these facilities are no longer applied following
the removal of the coin-operated machines. It is
understood that charging ceased in 2023;
however, the facilities continue to be widely
used. While the potential for significant
additional income is relatively low, the
reintroduction of a charging mechanism could
provide a contribution towards the ongoing
energy and maintenance costs associated with
the facilities. 
Consideration should be given to the
introduction of an appropriate mechanism
to ensure that Buckie Harbour users are
charged for the use of showering facilities. 
Page 95

Page 96

8 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Head of Operations &
Environment (in absence
of Service Manager
Harbours)
Yes  31/03/27 Will be reviewed in line with all fees and
charges for forthcoming year, including
operational considerations, and a clear
long term decision made 
Page 96

Page 97

9 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
3 Medium Financial Regulations Point 4.3 details the
following: 
“Income due to the Council, for work done,
goods supplied or services provided and not
paid for in advance or at the time, must be the
subject of accounts being rendered. Chief
Officers must ensure preparation and issue of
such accounts within one month of the agreed
point of sale…”. 
The majority of income, including pilotage
charges, landing charges and berthing fees, is
collected through the Council’s invoicing
system. A sample of invoices was selected for
detailed testing to confirm the accuracy of
charges raised and to ensure that transactions
were supported by appropriate and sufficient
documentation. 
Testing undertaken confirmed that the invoices
reviewed had been accurately raised and were
supported by appropriate evidential
documentation. However, audit testing
identified that 67% of the sampled invoices
Officers should be reminded of the
Council’s Financial Regulations and the
requirement to raise invoices within one
month of service delivery. 
Page 97

Page 98

10 
were issued between 6 weeks  and 5 months
after delivery of the service. The audit
acknowledges that staffing resource pressures
contributed to delays in invoice processing
during the period under review. Management
advised that these issues have subsequently
been addressed, and audit testing identified
evidence of improved timeliness in invoicing
arrangements. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Head of Operations &
Environment (in absence
of Service Manager
Harbours)
Yes  30/9/26 Staffing changes contributed to the finding.
Process review has been concluded and
detailed guidance and standards are being
embedded. 
Page 98

Page 99

11 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
4 Medium The audit also included a review to ensure that
rents are being charged accurately for Council-
owned commercial units located at Buckie and
Burghead Harbours. Testing confirmed that
rental income for these units is being accurately
charged and invoiced, with no discrepancies
identified between Housing and Property
Services records and the Council’s Financial
Management System. 
However, a review of a sample of lease
agreements found that these commercial units
had not been subject to a rent review for several
years. Lease agreement conditions allow for an
annual review of rental charges. Enquiries
found this was due to an historical, risk-based
operational decision to prioritise resource
towards reviewing higher-value leases, with
minimal uplifts considered proportionate for
leases generating less than £1,000 per annum.
However, it is understood that, due to additional
temporary resources, the intention is to
undertake rent reviews across all value
categories. It is appreciated that foregone rent
increases are likely to be low given the relatively
small values involved; the absence of periodic
Consideration should be given to
implementing periodic rent reviews across
all leases relating to units within
commercial harbours, including those
generating lower levels of income. This
may include assessing the
appropriateness of applying rental uplifts
to units below a defined value threshold,
for example, through inclusion within the
Council’s annual review of charges. 
Page 99

Page 100

12 
reviews increases the risk that rental income is
not optimised. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Service Manager –
Property, Estates &
Assets
Yes  31/12/27 It is recognised that agreements should
not be left to proceed indefinitely at their
initial rental levels however the opportunity
cost of spending time on these low value
leases can be high. A review of the lease
agreements is required and it is proposed
that this is undertaken over the next 12
months with options considered to
streamline the process including a
standard harbour unit lease agreement,
consideration of fixed rental uplifts
identified at lease commencement to the
option of the rent being part of the
Council’s annual review of charges. 
Officers from Property, Estates and Assets
will consider and discuss these options
with officers from Harbours and Legal as
appropriate and look to implement new
agreements within 18 months, resources
Page 100

Page 101

13 
permitting. Once a new agreement is
confirmed it will be used to replace existing
agreements as and when they come to an
end. 
Page 101

Page 102

14 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
5 Medium The Moray Council is the statutory harbour
authority and has inherited the statutory powers
conferred by the Grampian Regional Council
(Harbours Order) Confirmation Act 1987 to
manage, regulate and levy fees for the harbours
at Buckie, Burghead, Cullen, Portknockie,
Findochty and Hopeman. 
While the legislation provides the overarching
legal framework for harbour operations, it does
not set out detailed terms and conditions
governing the use of harbour facilities by
service users. Enquiries noted that other local
authorities have developed formal agreements
to regulate access, safety, charges and liability
for all users, thereby ensuring that harbour
facilities are used in a safe, controlled and
commercially managed manner. It is therefore
pleasing to note that the Service is currently
developing a similar document. Once
implemented, this will support improved
management and transparency in the use of
harbour facilities by establishing clear rules
relating to access, operational requirements
and the verification of charges, including those
A formal Terms and Conditions
Agreement for service users should be
finalised to establish a clear and
consistent framework governing harbour
use. This will strengthen controls over
access, operations, charging and
compliance, while enhancing
transparency and income assurance. 
Page 102

Page 103

15 
associated with cargo handling and fishing
landings. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Head of Operations &
Environment (in absence
of Service Manager –
Harbours)
Yes 31/03/27  The principle of clarity is accepted. Care
needs to be taken that any terms are
enforceable and are in line with
underpinning harbour legislation. The final
document will be based on relevant
legislation and legal advice received. 
Page 103

Page 104

16 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
6 Low In accordance with the Council’s Financial
Regulations, inventories should be maintained
for moveable equipment to support the effective
control and safeguarding of assets. All
equipment with a value exceeding £500 is
required to be recorded on inventory lists to
facilitate the identification and reporting of loss
or theft. During the audit, several items,
including specialised equipment with a value in
excess of £500, were identified. However, no
documented inventory record of these assets is
maintained. 
An Inventory Register should be
introduced and maintained to record all
moveable equipment with a value
exceeding £500. The register should
include key asset details and be subject to
regular review and verification. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Head of Operations &
Environment (in absence
of Service Manager
Harbours)
Yes  30/9/26 Asset register to be developed and
maintained. 
Page 104

Page 105

17 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
7 Medium The audit scope included a review of
expenditure to confirm appropriate accounting
arrangements and compliance with the
Council’s Financial Regulations. No significant
concerns were identified. However, testing of
staffing costs noted where expenditure had
been charged to an incorrect cost centre. This
has now been corrected. Enquiries found that
the requirement for overtime payments relates
to ongoing service delivery needs within the
Harbour Service. It is recognised that
operational working timescales associated with
maritime service delivery do not always align
with standard Council employee terms and
conditions, which may have contributed to this
ongoing requirement for overtime payments.
However, it is considered that overtime should
only be used on an exceptional and temporary
basis, rather than as a routine arrangement.
Senior management are aware of this issue and
are seeking an appropriate solution to address
the current contractual arrangements. 
Senior management should continue to
pursue a sustainable solution to the
contractual arrangements identified in this
finding, with the aim of ensuring that
ongoing service delivery can be
maintained without reliance on overtime. 
Page 105

Page 106

18 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Head of Operations &
Environment
Yes 31/03/27  Without an increase in headcount or
substantial change in employee terms &
conditions to reflect marine operational
environment it is likely that there will be a
continued requirement for overtime in
order to meet operational need for the
harbour (which is staffed 24/7) and the
dredger. However, the management team
are reviewing whether specialist terms &
conditions could be introduced to better
reflect the operating environment. The
commitment from the management team
in terms of action is to review and make
firm proposals. 
Page 106

Page 107

19 
Appendix 1 
AUDIT TERMS OF REFERENCE AND DEFINITIONS 
1. Audit Objectives 
1.1 The overall audit objective is to provide an objective independent opinion on
the adequacy and effectiveness of controls / processes.  
1.2 The audit will for each controls / process being considered: 
• Walkthrough the processes to consider the key controls; 
• Conduct sample testing of the identified key controls, and 
• Report on these accordingly 
1.3 All audit reviews are carried out in accordance with Global Internal Audit
Standards (GIAS). 
2. Definitions for Auditing Opinions and Findings 
2.1 In order to assist management in using our reports: 
The Internal Auditor will categorise audit assurance opinion according to
their overall assessment of the risk management system, effectiveness of the
controls in place and the level of compliance with these controls and the action
being taken to remedy significant findings or weaknesses. 
Assurance
Level
System and Testing Conclusion
Full The controls tested are being consistently applied
Substantial There is evidence that the level of non compliance with some of the
controls may put some of the system objectives at risk.
Limited The level of non compliance puts the system objectives at risk.
None Significant non-compliance with basic controls leaves the system
open to error or abuse. 
2.2 Risk ratings for each recommendation is based on the following criteria: 
High Fundamental control weaknesses that require immediate attention by
management to action and mitigate significant exposure to risk
Medium Less critically important controls absent, not being operated as
designed or could be improved
Low Lower level controls absent, not being operated as designed or could
be improved.
Page 107

Page 108

20 
Appendix 2 
STATEMENT OF RESPONSIBILITY   
The responsibility for designing and maintaining a sound system of internal control to
prevent and detect fraud and other irregularities rests with management, with internal
audit providing a service to management to support them to achieve this objective.
The Internal Audit Section will assess the adequacy and effectiveness of the system
of internal control arrangements implemented by management and perform sample
testing on those controls in the period under review with a view to providing an opinion
on the extent to which risks in this area are managed. 
The Internal Audit Section will undertake testing with the objective of detecting
significant control weaknesses. However, the audit approach alone should not be
relied upon to identify all strengths and weaknesses in internal controls nor to find any
fraud or irregularity. Even sound systems of internal control can only provide
reasonable and not absolute assurance and may not be proof against collusive fraud. 
The matters raised in this report are only those that came to our attention during the
course of the audit review and are not necessarily a comprehensive statement of all
the weaknesses that exist or all improvements that might be made. Recommendations
for improvements should be assessed by management for their full impact before they
are implemented. The performance of the audit review undertaken should not be taken
as a substitute for management’s responsibilities for the application of sound
management practices. 
This report must not be disclosed to any third party or reproduced in whole or in part
without the written consent of the Moray Council’s Service Manager Internal Audit and
Risk. 
Page 108

Page 109

Report to: Audit and Scrutiny
Committee 
Meeting Date: 29 September 2026     
Report by: Service Manager Internal Audit and Risk      
Author: Dafydd Lewis Contact Email: dafydd.lewis@moray.gov.uk 
Subject: Internal Audit Review – Home to School Transport 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The report advises Committee on an internal audit review completed for the               period from
18 June 2026 to 29 September 2026.  
1.2  This report is submitted to Committee in terms of Section III (I) (2) and (8) of the Council’s
Scheme of Administration relating to consideration of reports from the Council’s Internal
Auditor and monitoring delivery of the audit service through receipt of quarterly reports on
work carried out by Internal Audit.  
2.  SUMMARY  
2.1  This report provides details of the internal audit review of the home-to-school transport
contracts, which was agreed for review within the Audit Plan.  
3.  RECOMMENDATIONS  
3.1  It is recommended that Committee considers the contents of this report, seeks
clarification on any points noted and endorses the recommendations contained
within the report.   
Dafydd Lewis
Service Manager Internal Audit and Risk 
4.  BACKGROUND AND CONTEXT  
4.1  An internal audit was undertaken to review the governance, risk management and internal
control arrangements for the management of home-to-school transport contracts. The
Council has a statutory duty to provide appropriate home-to-school transport for eligible
Item 7.
Page 109

Page 110

children. The Public Transport Unit is operationally responsible for the delivery of the
home-to-school transport service, with a budget of approximately £5.4 million in 2025/26
for around 2,700 pupils across both primary and secondary schools.  
4.2  The scope of the audit did not include a review of the tendering arrangements for the
recently awarded home to school transport contracts. Instead, the audit assessed the
adequacy and effectiveness of the Council’s arrangements for managing and delivering
the transport service under the previous contracts awarded in 2019. However, the
operational improvements identified through this review remain relevant, given the
similarity in contractual conditions between the previous and current home to school
transport contracts. The audit reviewed the governance, operational and financial controls
in place to ensure that statutory duties are fulfilled, services are delivered efficiently and
public funds are appropriately safeguarded. The findings identified a need to further
strengthen compliance with regulatory requirements, alongside improvements to
administrative arrangements for the management of home to school transport contracts.
The detailed findings and recommendations from this review are set out within the audit
report in Appendix 1.  
5.  PROPOSALS  
5.1  It is recommended that Committee agree to note the progress made by Internal Audit in
the period from 18 June 2026 to 29 September 2026. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  ×
Policy and Legal  ×
Financial  ×
Risk × 
Staffing  ×
Best Value and Transformation × 
Property  ×
Information Communications Technology/Digital     ×
Equalities. Social Inclusion and Economic Impact   ×
Climate Change and Biodiversity Impact  × 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
Page 110

Page 111

☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
No implications directly arising from this report.  
6.4  Financial 
No implications directly arising from this report. 
6.5  Risk
The independent review of selected systems and procedures mitigates  the risks
associated with inadequate or ineffective control procedures. 
6.6  Staffing
No implications directly arising from this report. 
6.7  Best Value and Transformation
Internal audit work supports good governance and the delivery of efficient services. 
6.8  Property
No implications directly arising from this report. 
6.9  Information Communications/Technology/Digital Property
No implications directly arising from this report. 
6.10 Equalities, Social Inclusion and Economic Impact     
No implications directly arising from this report.        
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Page 111

Page 112

Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
There are no direct equalities, social inclusion or economic impacts arising from this report.
However, the work of Internal Audit contributes to the effectiveness of governance, risk
management and control arrangements across the Council, which support the delivery of
equitable, inclusive and sustainable outcomes for communities. 
6.11 Climate Change and Biodiversity Impacts 
No implications directly arising from this report. 
7.  CONSULTATION  
7.1  There have been no direct consultations during the preparation of this report.  
8.  BACKGROUND PAPERS  
8.1  None   
Page 112

Page 113

APPENDIX 1
1
Final Internal Audit Report
Home to School Transport 
June 2026 
Distribution: Head of Operations and Environment
Chief Financial Officer
Service Manager Transportation
Public Transport Manager
Service Manager Strategic Finance
The Internal Audit Section provides Management with an opinion on the internal control environment
and also categories risk ratings for recommendations as high, medium or low (detailed explanation
provided in Appendix1). The audit recommendations for this review have been classified as follows
Assurance Level Risk Ratings for
Recommendations
Substantial
Priority 1 0
Priority 2 4
Priority 3 2
Confidentiality and Disclosure Clause
This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only
those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information
provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings
on the information and documentation provided and consequently, no complete guarantee can be given that this Report is
necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required.
This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian
Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party
who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation,
amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract,
reinterpretation, amendment and/or modification by any third party is entirely at their own risk.
Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities,
limitations and confidentiality.
Page 113

Page 114

Appendix 1 
2
Contents 
Page
Home to School Transport 
1. Introduction & Scope 3-4
2. Key Issues  4-5 
Detailed Report 
3. Findings/Recommendations 6-17
4. Management Response 7-18 
Appendices 
1. Audit Terms of Reference and Definitions 
2. Statement of Responsibility 
Page 114

Page 115

Appendix 1 
3
1. Introduction and Audit Scope 
The 2025/26 Internal Audit Plan includes an audit of the arrangements in place to
provide assurance that the management of school transport contracts complies
with contractual terms and conditions, as well as with the Council’s Financial
Regulations and Procurement Guidelines. 
Moray Council has a statutory responsibility to ensure that appropriate travel
arrangements are in place to support school attendance for eligible children. This
includes providing free home to school transport for pupils of school age where
the nearest suitable school exceeds the prescribed walking distance, as well as
making suitable transport arrangements for children who are unable to walk to
school due to mobility difficulties, additional support needs or related health and
safety risks. The Public Transport Unit is responsible for managing the Council’s
statutory home to school transport service. The approved budget for delivery of
the service in 2025/26 was approximately £5.4 million with actual expenditure of
£5.3 million. Home to school transport is currently provided to approximately
2,700 pupils across both primary and secondary schools, with demand fluctuating
in response to changes in pupil numbers and additional support needs
requirements. The service is predominantly delivered through external local
transport providers, which account for approximately 85% of overall service
provision. The Council also operates an in-house service that delivers home to
school transport to meet the remaining transport requirements. 
The Public Transportation Unit has recently completed the award of home to
school transport contracts following a tender exercise undertaken between
October 2025 and March 2026. The contract, valued at approximately £27.1
million, aligns with the revised home to school Transport Policy approved by the
Council on 24 September 2025, with a start date of 1 April 2026 for five years,
with an option for a 2 year extension. This replaces the previous home to school
transport contract that was awarded in 2019.  It was noted that the previous
contract included community transport requirements that has now been tendered
separately.  The Council delivers its statutory home to school transport provision
by awarding contracts to multiple transport providers across defined routes,
including arrangements for those pupils with additional support needs who are
deemed eligible for transport. This approach supports operational flexibility,
market access for providers of differing scale and the effective management of
cost, risk and service continuity. 
The scope of the audit did not include a review of the tendering arrangements for
the recently awarded home to school transport contracts. Instead, the audit
assessed the adequacy and effectiveness of the Council’s arrangements for
managing and delivering the transport service under the previous contract, which
commenced in 2019. The audit also considered the governance, operational, and
financial controls in place to ensure that statutory duties are fulfilled, services are
delivered efficiently, and public funds are appropriately safeguarded. Operational
Page 115

Page 116

Appendix 1 
4
improvements identified through this review remain relevant to current contract
management processes, given the similarity in contractual conditions between
the previous and current home to school transport contracts. 
Audit testing included a review of whether policies, procedures and operating
practices support compliance with relevant legislation, Council’s Financial
Regulations, Procurement Guidelines and the terms and conditions of the home
to school transport contract. The audit assessed contract management
arrangements, service provider performance monitoring and the controls in place
to ensure that payments are accurate, appropriately supported and represent
value for money. The audit also considered the Council’s oversight arrangements,
including the adequacy of assurance regarding service quality, compliance with
health and safety requirements and the effective discharge of safeguarding
responsibilities. 
The audit was carried out in accordance with the Global Internal Audit Standards
(GIAS). 
2. Key Issues 
• The Council has a responsibility to ensure that providers of home to
school transport maintain appropriate levels of insurance, thereby
supporting pupil safety and mitigating legal, financial and reputational
risk. The audit confirmed that insurance documentation is verified prior
to contract award; however, no formal process was in place to provide
ongoing assurance that insurance cover continues to meet contractual
requirements throughout the life of the contract. The introduction of a
formal process to obtain and review annual confirmation of insurance
cover from all home to school transport providers would strengthen
assurance arrangements and support the effective management of
these risks over the duration of the contract. 
• Sample testing of contract variations found that correct procurement
procedures were generally followed and supported by established
evaluation arrangements involving both the Public Transport Unit and
the Procurement Service. However, improvements in contract
documentation and evaluation processes were identified.  In addition,
the audit sample noted a contract variation in which the appointment of 
providers for home to school transport routes was not undertaken in
accordance with the Council’s approved procurement arrangements.
While the operational urgency to maintain continuity of service delivery
is acknowledged and alternative quotations were obtained to
demonstrate value for money, the approach undertaken did not comply
with the Council’s Financial Regulations or Procurement Guidelines. 
Page 116

Page 117

Appendix 1 
5
• The audit report also includes recommendations to further strengthen
compliance with regulatory requirements and the administration of the
home to school transport contracts. Addressing these matters will
enhance transparency, support effective governance and compliance
with contractual arrangements and reduce the risk of misunderstanding
or challenge. 
Page 117

Page 118

6 
Findings/Recommendations - Home to School Transport 2025/26 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
1 Low The audit reviewed whether information relating to
home to school transport arrangements, as
published on the Council’s website or provided in
paper format, is current, accurate and clearly
presented. This included an assessment of whether
appropriate instructions and guidance are provided,
together with clear information on any applicable
charges.  The audit found that information relating to
home to school transport is generally easily
accessible and provides clear guidance and
instructions. However, elements were identified as
being outdated. This includes information on
charges within the online application forms for
non-entitled and out-of-zone applications, as well as
details contained within the paper application form
relating to mileage parameters for pupils eligible for
free home to zoned school transport. 
Information relating to home to school
transport arrangements, across both online
and paper formats, should be reviewed and
updated to reflect current policy and charges.
Regular reviews should be undertaken to
ensure the ongoing accuracy of published
information. 
Page 118

Page 119

7 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Public Transport Manager Yes 31/07/2026 The team have already reviewed website and
updated most areas that had become out of
date in oversight. Final checks and any
additional updates will be made by 31 July
2026. 
Page 119

Page 120

8 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
2 Medium The audit reviewed the process applied when
contract variations are required for previously
awarded home to school transport routes. Route
variations that cannot be delivered by existing
transport providers must be procured in accordance
with the Procurement Guidelines. Depending on the
financial value, this may require a formal tendering
exercise or the obtaining of alternative quotations
through the use of Quick Quotes.   
Sample testing was undertaken of contract
variations to ensure compliance with Procurement
Guidelines. The sample comprised four contract
variations, with a combined annual contractual value
of £196,442. A review of these variations was
undertaken to assess compliance with Financial
Regulations, Procurement Guidance and the terms
and conditions of the home to school transport
contracts. The following points were noted: 
• Audit testing found that contract variations
were procured in accordance with the
Procurement Guidelines for three of the four
variations reviewed. However, the
specification requirements detailed in the
Invitation to Quote issued to transport
providers did not include key operational
The Public Transport Unit, in conjunction with
the Procurement Service, should ensure that
all future contract variations for home to school
transport services comply with Financial
Regulations and Procurement Guidelines and
include requirements for the provision of key
contractual and performance information. 
Page 120

Page 121

9 
conditions, including vehicle maintenance
standards, Protection of Vulnerable Groups
(PVG) Scheme membership, possession of
valid Driver Qualification Cards and broader
regulatory compliance requirements.
However, it was noted that checks were
undertaken as part of the evaluation process
to provide assurance that appointed
transport providers met these operational
requirements prior to contract award. 
• Procurement evaluations to determine the
preferred transport provider are undertaken
using a defined quality-to-price ratio. The
process involves the Public Transport Unit
(PTU) evaluating provider submissions,
which are subsequently moderated by the
Procurement Service as an assurance
control over the validity of the assessment
process.    Within the sample reviewed, it
was noted that the evaluation spreadsheet
used by PTU as part of the evaluation
process included an incorrect application of
the quality-to-price ratio. This was attributed
to human error. A recalculation of the
evaluation using a corrected spreadsheet
confirmed that the error did not affect the
outcome, and the preferred transport
providers for the contracts remained
unchanged.
Page 121

Page 122

10 
• In the sample reviewed, one contract
variation was found to not comply with the
Procurement Guidelines. The annual value
of this contract variation was approximately
£86,450, which required the procurement of
transport providers through a tendering
exercise. In addition, where Procurement
Guidelines are not followed, the Financial
Regulations detail requirements for reporting
and consultation with the Chief Financial
Officer; this was not undertaken. However,
the operational urgency to maintain service
delivery continuity is acknowledged, and
alternative quotations were sought from
service providers prior to awarding the
contract.
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Public Transport Manager Yes 31/03/2027 Improvements have already been made in
terms of agreed processes with procurement
for variations. All officers involved in the
procurement process in the PTU will be
retrained on the Financial Regulations and
Procurement Guidelines to ensure a
comprehensive understanding of the
underpinning regulations and rationale. 
Page 122

Page 123

11 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
3 Medium The Council has a responsibility to ensure that
providers delivering home to school transport
services hold appropriate insurance cover. This is
essential to safeguard pupils and to mitigate
associated legal, financial and reputational risks.
This requirement also supports the Council’s
safeguarding obligations and effective contract
management arrangements. While verification of
transport providers’ insurance documentation is
undertaken at the point of contract award, the audit
review identified that no ongoing process is in place
to obtain annual assurance that insurance cover
remains valid and compliant with contractual
requirements throughout the contract period.
Confirming that adequate insurance coverage
remains in place provides assurance that risks and
exposures arising from accidents or incidents are
appropriately managed and reduces the Council’s
exposure to uninsured claims and associated
reputational risk. 
Annual assurance should be obtained to
confirm that home to school transport
providers maintain appropriate insurance
cover throughout the full duration of their
contractual arrangements. 
Page 123

Page 124

12 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Public Transport Manager Yes 31/03/2027  The service has always been mindful of good
controls in relation to the council’s broad duty
of care and a statutory requirement to have
regard to safety in relation to the journey to
school. In addition to the start of contract
insurance checks, Operator Licence and Taxi
Licensing requirements mean that all
operators of home to school transport are
required to be of good standing and have
appropriate insurance in place. Any bus /
coach operator not able to demonstrate
insurance alongside their financial standing
would be rendered liable to be stripped of their
Operator licence and thus ability to trade at
Public Inquiry. Failure to demonstrate
insurance for a taxi operator through the
council’s own taxi licensing arrangements
would see their licence withdrawn and the taxi
operator unable to trade. 
Notwithstanding these existing controls an
annual check of insurance will be put in place
by the PTU team. 
Page 124

Page 125

13 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
4 Medium The Council’s home to school transport tenders
advertised on Public Contracts Scotland in 2018
specified an initial five-year contract term with
provision for a two-year extension. The contracts
were subsequently extended for the additional
two-year period. Such an extension represents a
variation to the original contract and should be
formally documented through a Letter of Variation to
ensure appropriate contractual governance,
transparency and compliance with procurement and
contract management requirements. A Letter of
Variation constitutes a contractual amendment and
should be agreed and signed by all parties to the
original contract, including the transport provider.
Audit testing identified that no Letters of Variation
were in place for contract extensions implemented
during 2024–25, and that only partial documentation
was obtained for extensions in 2025–26, with signed
Letters of Variation available for approximately 40%
of service providers. 
All future extensions to home to school
transport contracts should be supported by
agreed and signed Letters of Variation from all
providers. 
Page 125

Page 126

14 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Public Transport Manager Yes  31/07/2026 The team has created a revised contract
award letter template in discussion with the
procurement team, which will be sent out as
normal to the supplier when any contract
change is agreed, signed by the supplier and
returned duly signed to the PTU to then be
forwarded to the Procurement admin.   
Page 126

Page 127

15 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
5 Medium As detailed previously, the Council’s home to school
transport tenders advertised on Public Contracts
Scotland in 2018 specified an initial five-year
contract term, with provision for a two-year
extension. As the contracts were subsequently
extended for the additional two-year period, this
should be formally documented through a Letter of
Variation agreed with the relevant transport
provider. A review of the Letter of Variation issued
for the second optional extension period detailed the
following: 
“…that the inflationary increase applied to the
contract in April 2025 will be either the current CPI
(Consumer Price Index) rate of 2.2% plus 1% or the
CPI rate in March 2025, whichever is higher.” 
The audit noted that, based on advice from the Chief
Financial Officer, the March 2025 CPI rate was set
at 3%.  This rate was subsequently applied as the
percentage uplift to payments made to transport
providers for 2025/26 and was formally
communicated by letter in April 2025.   However, the
Letter of Variation details the uplift as 3.2%
(comprising 2.2% plus 1%). Analysis found that
applying the lower rate has resulted in an estimated
In accordance with the Letter of Variation
extending the home to school transport
contracts for 2025/26, consideration should be
given, in consultation with Legal Services, to
whether an additional 0.2% uplift is payable to
transport providers. 
Page 127

Page 128

16 
underpayment of approximately £10,000 to home to
school transport providers. 
Management Response 
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Public Transport Manager Yes  30/09/2026 The PTU manager has evidence of contacting
the Head of Finance in March 2025, as would
be normal practice, to agree a rate for the April
route uplift on the contract. This was agreed at
3% and letters advising of the uplift on a route
by route basis were issued to the suppliers.
The PTU Manager is unsure why the original
offer of 2.2% plus 1% was made and can only
surmise that it was due to a misunderstanding
of the rate carried over from an earlier award. 
No supplier advised of any discrepancy
between the 3.2% originally proposed and the
actual award of 3% paid out. A view should be
taken by Legal Services as to which rate is
contractually applicable and whether a
retrospective payment based on the 3.2%
should be made. 
Page 128

Page 129

17 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
6 Low The Public Contracts (Scotland) Regulations 2015
require contracting authorities to calculate and
publish contract award values based on the total
estimated lifetime value of a contract, including any
potential extension periods. A review of the
Council’s home to school transport tenders
advertised on Public Contracts Scotland in 2018 and
2025 identified that, while the tender documentation
provided for a two-year extension to the initial
five-year contract term, the contract award values
published reflected the initial five-year period only
and did not include the estimated value of the
potential extension. 
All future home to school transport contract
award notices published on Public Contracts
Scotland should accurately reflect the total
estimated lifetime value of the contract,
including any potential extension periods. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Assistant Procurement
Manager
Yes 30/09/2026  Procurement will ensure that all future contract
award notices published on Public Contracts
Scotland reflect the total estimated lifetime
value of the contract, including any potential
extension periods, in line with the Public
Contracts (Scotland) Regulations 2015. This
Page 129

Page 130

18 
will be communicated to officers involved in
procurement activity and reflected in
procurement guidance and review processes.
This will be factored into any future
procurement exercises in discussion with the
Procurement team. 
Page 130

Page 131

19 
Appendix 1 
AUDIT TERMS OF REFERENCE AND DEFINITIONS 
1. Audit Objectives 
1.1 The overall audit objective is to provide an objective independent opinion on
the adequacy and effectiveness of controls / processes.  
1.2 The audit will for each controls / process being considered: 
• Walkthrough the processes to consider the key controls; 
• Conduct sample testing of the identified key controls, and 
• Report on these accordingly 
1.3 All audit reviews are carried out in accordance with Global Internal Audit
Standards (GIAS).    
2. Definitions for Auditing Opinions and Findings 
2.1 In order to assist management in using our reports: 
The Internal Auditor will categorise audit assurance opinion according to
their overall assessment of the risk management system, effectiveness of the
controls in place and the level of compliance with these controls and the action
being taken to remedy significant findings or weaknesses. 
Assurance
Level
System and Testing Conclusion
Full The controls tested are being consistently applied
Substantial There is evidence that the level of non compliance with some of the
controls may put some of the system objectives at risk.
Limited The level of non compliance puts the system objectives at risk.
None Significant non-compliance with basic controls leaves the system
open to error or abuse. 
2.2 Risk ratings for each recommendation is based on the following criteria: 
High Fundamental control weaknesses that require immediate attention by
management to action and mitigate significant exposure to risk
Medium Less critically important controls absent, not being operated as
designed or could be improved
Low Lower level controls absent, not being operated as designed or could
be improved.
Page 131

Page 132

20 
Appendix 2 
STATEMENT OF RESPONSIBILITY   
The responsibility for designing and maintaining a sound system of internal control to
prevent and detect fraud and other irregularities rests with management, with internal
audit providing a service to management to support them to achieve this objective.
The Internal Audit Section will assess the adequacy and effectiveness of the system
of internal control arrangements implemented by management and perform sample
testing on those controls in the period under review with a view to providing an opinion
on the extent to which risks in this area are managed. 
The Internal Audit Section will undertake testing with the objective of detecting
significant control weaknesses. However, the audit approach alone should not be
relied upon to identify all strengths and weaknesses in internal controls nor to find any
fraud or irregularity. Even sound systems of internal control can only provide
reasonable and not absolute assurance and may not be proof against collusive fraud. 
The matters raised in this report are only those that came to our attention during the
course of the audit review and are not necessarily a comprehensive statement of all
the weaknesses that exist or all improvements that might be made. Recommendations
for improvements should be assessed by management for their full impact before they
are implemented. The performance of the audit review undertaken should not be taken
as a substitute for management’s responsibilities for the application of sound
management practices. 
This report must not be disclosed to any third party or reproduced in whole or in part
without the written consent of the Moray Council’s Service Manager Internal Audit and
Risk. 
Page 132

Page 133

Report to: Audit and Scrutiny
Committee 
Meeting Date: 29 September 2026     
Report by: Service Manager Internal Audit and Risk      
Author: Dafydd Lewis Contact Email: dafydd.lewis@moray.gov.uk 
Subject: Internal Audit Review – Management of School Funds 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The report advises Committee on an internal audit review completed for the period from
18 June 2026 to 29 September 2026.  
1.2  This report is submitted to Committee in terms of Section III (I) (2) and (8) of the Council’s
Scheme of Administration relating to consideration of reports from the Council’s Internal
Auditor and monitoring delivery of the audit service through receipt of quarterly reports on
work carried out by Internal Audit.  
2.  SUMMARY  
2.1  This report provides details of the internal audit review of Management of School Funds,
which was agreed for review within the Audit Plan.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee considers the contents of this report, seeks
clarification on any points noted and endorses the recommendations contained
within the report.   
Dafydd Lewis
Service Manager Internal Audit and Risk 
4.  BACKGROUND AND CONTEXT  
4.1  An Internal Audit review was undertaken of the arrangements in place for the Management
of School Funds. A school fund is money held and managed by a school, separately from
the Council's delegated budget from the local authority. They are typically used to support
school activities, trips, events and additional resources for pupils. These funds are
Item 8.
Page 133

Page 134

required to be managed in accordance with the School Fund Regulations, with the Head
Teacher being responsible for ensuring that the administration of these monies operates
in accordance with these Regulations.  
4.2  The audit reviewed the governance, financial management and control arrangements in
place for the administration of School Funds. Audit testing included examining a sample of
funds to assess whether income and expenditure were properly recorded and supported
by appropriate documentation, whether bank accounts were regularly reconciled and
independently reviewed and whether funds were managed in accordance with the School
Fund Regulations. The detailed findings and recommendations from this review are set out
in the audit report in Appendix 1.  
5.  PROPOSALS  
5.1  It is recommended that Committee agree to note the progress made by Internal Audit in
the period from 18 June 2026 to 29 September 2026. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  ×
Policy and Legal  ×
Financial  ×
Risk × 
Staffing  ×
Best Value and Transformation × 
Property  ×
Information Communications Technology/Digital     ×
Equalities. Social Inclusion and Economic Impact   ×
Climate Change and Biodiversity Impact  × 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
Page 134

Page 135

☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
No implications directly arising from this report.  
6.4  Financial 
No implications directly arising from this report. 
6.5  Risk
The independent review of selected systems and procedures mitigates  the risks
associated with inadequate or ineffective control procedures. 
6.6  Staffing
No implications directly arising from this report. 
6.7  Best Value and Transformation
Internal audit work supports good governance and the delivery of efficient services. 
6.8  Property
No implications directly arising from this report. 
6.9  Information Communications/Technology/Digital Property
No implications directly arising from this report. 
6.10 Equalities, Social Inclusion and Economic Impact     
No implications directly arising from this report.        
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
Page 135

Page 136

JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
There are no direct equalities, social inclusion or economic impacts arising from this report.
However, the work of Internal Audit contributes to the effectiveness of governance, risk
management and control arrangements across the Council, which support the delivery of
equitable, inclusive and sustainable outcomes for communities. 
6.11 Climate Change and Biodiversity Impacts 
No implications directly arising from this report. 
7.  CONSULTATION  
7.1  There have been no direct consultations during the preparation of this report.  
8.  BACKGROUND PAPERS  
8.1  None   
Page 136

Page 137

APPENDIX 1
1
Final Internal Audit Report
Management of School Funds 
June 2026 
Distribution: Head of Education (Chief Education Officer)
Interim Service Manager Business Support
Business Support Development Manager
The Internal Audit Section provides Management with an opinion on the internal control environment
and also categories risk ratings for recommendations as high, medium or low (detailed explanation
provided in Appendix1). The audit recommendations for this review have been classified as follows
Assurance Level Risk Ratings for
Recommendations
Limited
Priority 1 2
Priority 2 3
Priority 3 1
Confidentiality and Disclosure Clause
This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only
those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information
provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings
on the information and documentation provided and consequently, no complete guarantee can be given that this Report is
necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required.
This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian
Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party
who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation,
amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract,
reinterpretation, amendment and/or modification by any third party is entirely at their own risk.
Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities,
limitations and confidentiality.
Page 137

Page 138

Appendix 1 
2
Contents 
Page
Management of School Funds   
1. Introduction & Scope 3
2. Key Issues  3-4 
Detailed Report 
3. Findings/Recommendations 5-17
4. Management Response 6-18 
Appendices 
1. Audit Terms of Reference and Definitions 
2. Statement of Responsibility 
Page 138

Page 139

Appendix 1 
3
1. Introduction and Audit Scope 
As part of the approved Internal Audit Plan for 2025/26, a review was undertaken
of the arrangements in place for the management of school funds. Council funding
provided to schools is governed by Financial Regulations and Procurement
Guidelines. However, schools may also hold funds outside of their delegated
budgets, which are managed locally and typically comprise monies raised through
activities such as donations, fundraising events, and contributions towards school
trips and other voluntary activities. 
While school funds are not held within core Council budgets, the Council retains
overarching responsibility for their governance. These funds are required to be
managed in accordance with the School Fund Regulations. The Head Teacher is
responsible for ensuring that the administration of these monies operates in
accordance with these Regulations. The Regulations set out the types of activities
that fall within the scope of school funds and provide a consistent framework for
good practice and financial control. They are intended to ensure that appropriate
standards of governance, financial management and accountability are applied
consistently across all schools within the Council. The audit review noted that the
cumulative fund balances held by all schools across the Council, including both
primary and secondary establishments, totalled approximately £1 million. 
The scope of the audit was to review the arrangements in place for the
management of school funds and to check compliance with the Council’s School
Fund Regulations. This included consideration of the governance and oversight
arrangements within Education Services. The audit approach involved reviewing
a sample of primary and secondary schools to provide a representative
assessment of practices across the Council. In addition, the audit sought to
identify opportunities to strengthen internal controls and improve consistency in
the administration of School Funds across the school estate. 
The audit was carried out in accordance with the Global Internal Audit Standards
(GIAS).  
2. Key Issues 
• The audit review identified inconsistencies across schools in complying
with the School Fund Regulations, particularly in relation to the
completion, reporting and timely submission of Annual Statements of
Accounts and Bank Reconciliation Statements to Education Services. 
Audit testing of the types of payments made from a sample of schools
found that the majority of payments were in accordance with the School
Fund Regulations. However, examples were identified where
expenditure did not comply with the Regulations and in one case, with
Page 139

Page 140

Appendix 1 
4
the Council’s Financial Regulations. It is therefore considered that
improved governance arrangements and strengthened financial
compliance controls are required to ensure consistent adherence to the
School Fund Regulations across all schools. 
• It is considered that the School Fund Regulations provide a framework
for the effective management, safeguarding and administration of school
funds, ensuring accountability, transparency and compliance with
statutory requirements. However, there is no defined process for the
periodic review or regular reissue of the Regulations to schools. Audit
testing identified areas where updates are required within the
Regulations, including Value Added Tax and where further guidance
should be considered on the use of debit cards for purchases. While
changes in school staffing are acknowledged, an audit visit to a school
found a lack of awareness of the School Fund Regulations. 
Page 140

Page 141

5 
Findings/Recommendations –Management of School Funds - 2025/26 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
1 Medium The School Fund Regulations provide a
framework for the proper management,
safeguarding and administration of school
funds, ensuring accountability, transparency
and compliance with statutory requirements. It
was noted that the Regulations were last
reviewed and updated in April 2021. The audit
considers that the Regulations remain broadly
fit for purpose; however, certain elements,
including guidance relating to Value Added Tax
(VAT), require updating. In addition, the
Regulations do not specify a formal review cycle
or arrangements for periodic reissue to Head
Teachers. While staffing changes within the
Education Service are recognised, an audit visit
found that a Head Teacher and the School
Administrator were not aware of the School
Fund Regulations. The findings from this review
indicate a need to strengthen awareness and
understanding to support schools in meeting the
administrative requirements for effective School
Fund management. 
The Education Service should review and
update the School Fund Regulations,
including areas such as Value Added Tax
(VAT), and introduce a formal review cycle
with arrangements for regular reissue to
Head Teachers. Where necessary,
appropriate training should also be
provided to support staff in understanding
and complying with the requirements of
the Regulations. 
Page 141

Page 142

6 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Interim Service Manager
Business Support
Yes 31/12/2026  The School Fund Regulations will be
updated with a review cycle implemented
and training will be provided to all Head
Teachers at a monthly Education Briefing. 
Page 142

Page 143

7 
Ref Risk Ratings for
Recommendations
Audit Finding 
2 Low School Fund Regulations (3.1) details; 
“The School Fund should be managed by a staff
committee which should include at least a
Chairperson and the School Administrator as
the appointed Treasurer. The Business Support
Administration Manager within Education
Services should be notified of the names of
these officers and should also be notified
immediately of any changes to the above
posts.” 
The audit found that Education Services do not
maintain records of current Chairpersons and
Treasurers for schools. Maintaining accurate
and up-to-date records of key school fund
postholders is essential to support effective
governance arrangements and provide
appropriate oversight of fund administration
across all schools. 
Education Services should establish and
maintain an up-to-date central record of
school fund chairpersons and treasurers
for all schools. The record should be
subject to periodic review and verification
to ensure information remains accurate
and complete. 
Page 143

Page 144

8 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Interim Service Manager
Business Support
Yes 30/09/2026 A register of school fund chairpersons and
treasurers will be created and completed
by all schools with a process established
for regular review and update. 
Page 144

Page 145

9 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
3 High School Fund Regulations (16.1) detail the
following requirement: 
“A signed copy by both the Treasurer and
Auditor of the Annual Statement of Accounts/
Bank Reconciliation Statement should be
submitted to the Business Support
Administration Manager (Education Services)
by the 1st November each year.” 
The audit reviewed the school fund financial
returns for 2024/25 submitted by all schools to
Education Services to ensure they were in
accordance with the prescribed requirements.
The following points were noted: 
• At the time of the audit, five schools had
not submitted their Annual Statement of
Accounts and Bank Reconciliation
Statements for 2024/25. In addition, one
of these schools had also failed to submit
the required financial returns for
2023/24. 
All schools should be reminded of their
responsibility to comply with the School
Fund Regulations, particularly regarding
the completion and timely submission of
annual financial returns to Education
Services. In addition, the Annual
Statement of Accounts should be
sufficiently detailed to accurately reflect
the full range of school fund activities.
Consideration should also be given to
Education Services, strengthening
monitoring and compliance review
arrangements for annual school fund
returns to ensure adherence to the School
Fund Regulations. 
Page 145

Page 146

10 
• Twenty-two schools (18 primary and 4
secondary) submitted their returns after
the 1 November 2025 deadline, with
delays ranging from one to three months.
• Four primary schools’ Annual
Statements of Accounts and Bank
Reconciliation Statements did not
include evidence of independent
certification/ audit.
• Eleven schools (9 primary and 2
secondary) submitted incomplete
returns, omitting either the Annual
Statement of Accounts or Bank
Reconciliation Statements.
• The review of submitted Annual
Statements identified 16 schools (13
primary and 3 secondary) that allocated
over 20% of their annual expenditure to
miscellaneous/general categories. This
reduces financial transparency and
weakens the audit trail.  
From an internal audit perspective, these
findings are of concern in relation to levels of
compliance with School Fund Regulation
requirements and the effectiveness of
monitoring arrangements.
Page 146

Page 147

11 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Head of Education (Chief
Education Officer)
Yes 31/12/2026  Once the School Fund Regulations are
updated, a briefing will be held for all Head
Teachers to remind them of their duty and
to share expectations and responsibilities
for adhering to the regulations and
providing annual updates or changes once
these occur.  
Page 147

Page 148

12 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
4 Medium School Fund Regulations provide a structured
control framework for the management of funds
held by schools. Their purpose is to ensure that
all income and expenditure relating to school
funds are properly authorised, recorded, and
used for the general benefit of the pupils or the
school as a whole. The Regulations provide
working examples of activities within the scope
of the fund, including school trips, fetes,
concerts, dances and raffles, but also specify
what the fund should not be used for, including
staff functions, leaving gifts, salary payments,
loans, and travelling expenses. 
The internal audit review randomly selected a
sample of schools and reviewed payments
made from their school fund accounts to check
compliance with the Regulations. Testing found
that the majority of expenditure complied with
the School Fund Regulations. However,
examples were noted where payments had
been made for the following categories of
expenditure: 
Education Services should remind schools
of the requirements of the School Fund
Regulations and provide clear guidance
on the categories of expenditure that fall
within and outside the scope of the
Regulations to support consistent
application and compliance. 
Page 148

Page 149

13 
• In-service day refreshments
• Staff travelling costs to attend training
events
• Maintenance and repairs to school
premises
• Gritting and snow clearing of car parks
and paths
• Staff gifts 
It is considered that most of the categories of
expenditure listed fall outwith the scope of the
School Fund Regulations and would normally
be expected to be procured through the
Devolved School Management Budget. While it
is recognised that gifts to staff may mark
significant occasions, such payments should
not be funded from Council or School Funds. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Interim Service Manager
Business Support 
Yes 31/12/2026 This will be included in training, updated
Regulations and key information added to
Education Handbook. 
Page 149

Page 150

14 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
5 High The sample of school fund accounts reviewed,
as detailed in Finding 4, also identified a
payment of £1,200 made to a member of staff
at a school. Further enquiries established that
this related to a “staff advancement” arising
from a delay in implementing a change to the
employee’s contractual hours. The amount was
subsequently reimbursed to the School Fund
approximately two months after the payment
was made. 
As noted previously, the school fund must not
be used for “salary payments”. In addition, this
arrangement is not in accordance with the
Council’s Financial Regulations, specifically
Regulation 3.10, which states: 
“All individuals employed by the Council under
a contract of service shall be paid through the
payroll system to ensure proper accounting for
Income Tax and National Insurance is made.” 
Education Services should remind schools
that school fund accounts must not be
used for salary payments, advances of
pay or loans to staff. All payroll-related
matters should be processed through the
Council’s Payroll Service in accordance
with the Council’s Financial Regulations. 
Page 150

Page 151

15 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Head of Education (Chief
Education Officer) 
Yes 31/08/2026 This will be included in the pre-return
briefing for session 2026-27 for all Head
Teachers in August with a copy of the
current School Fund Regulations. Moving
forward all actions will be included in Head
Teacher Induction. 
Page 151

Page 152

16 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
6 Medium The audit reviewed a sample of schools to
assess arrangements for processing payments
and to ensure compliance with the School Fund
Regulations. The Regulations allow payments
to be made either by cheque or online; however,
all payments must be authorised by at least two
individuals included on the authorised
signatories list. The following points were noted: 
• Online transactions were noted in the
sample of schools reviewed, which were
authorised by only one signatory. School
Fund Regulations (4.6) state that “each
payment must be authorised by two
signatories separately online before any
funds are released from an account.”
This functionality is available through
banks for school fund-type accounts.
The review found no concerns regarding
the validity of the payments, and it was
also noted that schools had
arrangements in place for a secondary
signatory to review transactions
undertaken.
As highlighted in previous findings,
schools should be reminded of the
requirements of the School Fund
Regulations to ensure compliance. In
addition, consideration should be given to
reviewing and updating the Regulations in
relation to payment processing
arrangements, including the use of debit
cards. 
Page 152

Page 153

17 
• Audit testing also identified that schools
used debit cards for purchases.
Arrangements were in place for oversight
of the authorisation process by another
signatory of the account. However, the
use of debit cards is not in accordance
with the School Fund Regulations. 
It is acknowledged that the use of cheques for
expenditure has declined significantly over a
number of years due to the increased
prevalence and convenience of digital payment
methods. As a result, consideration should be
given to reviewing and, where appropriate,
updating the School Fund Regulations to reflect
current payment practices better. However, any
revised regulations should ensure that effective
governance, authorisation and monitoring
controls are maintained to support appropriate
financial oversight and mitigate the risk of
misuse or fraud. 
Page 153

Page 154

18 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Head of Education (Chief
Education Officer) 
Yes 31/08/2026 This will be included in pre-return briefing
for session 2026/27 and then included in
updated Regulations. 
Page 154

Page 155

19 
Appendix 1 
AUDIT TERMS OF REFERENCE AND DEFINITIONS 
1. Audit Objectives 
1.1 The overall audit objective is to provide an objective independent opinion on
the adequacy and effectiveness of controls / processes.  
1.2 The audit will for each controls / process being considered: 
• Walkthrough the processes to consider the key controls; 
• Conduct sample testing of the identified key controls, and 
• Report on these accordingly 
1.3 All audit reviews are carried out in accordance with Global Internal Audit
Standards (GIAS). 
2. Definitions for Auditing Opinions and Findings 
2.1 In order to assist management in using our reports: 
The Internal Auditor will categorise audit assurance opinion according to
their overall assessment of the risk management system, effectiveness of the
controls in place and the level of compliance with these controls and the action
being taken to remedy significant findings or weaknesses. 
Assurance
Level
System and Testing Conclusion
Full The controls tested are being consistently applied
Substantial There is evidence that the level of non compliance with some of the
controls may put some of the system objectives at risk.
Limited The level of non compliance puts the system objectives at risk.
None Significant non-compliance with basic controls leaves the system
open to error or abuse. 
2.2 Risk ratings for each recommendation is based on the following criteria: 
High Fundamental control weaknesses that require immediate attention by
management to action and mitigate significant exposure to risk
Medium Less critically important controls absent, not being operated as
designed or could be improved
Low Lower level controls absent, not being operated as designed or could
be improved.
Page 155

Page 156

20 
Appendix 2 
STATEMENT OF RESPONSIBILITY   
The responsibility for designing and maintaining a sound system of internal control to
prevent and detect fraud and other irregularities rests with management, with internal
audit providing a service to management to support them to achieve this objective.
The Internal Audit Section will assess the adequacy and effectiveness of the system
of internal control arrangements implemented by management and perform sample
testing on those controls in the period under review with a view to providing an opinion
on the extent to which risks in this area are managed. 
The Internal Audit Section will undertake testing with the objective of detecting
significant control weaknesses. However, the audit approach alone should not be
relied upon to identify all strengths and weaknesses in internal controls nor to find any
fraud or irregularity. Even sound systems of internal control can only provide
reasonable and not absolute assurance and may not be proof against collusive fraud. 
The matters raised in this report are only those that came to our attention during the
course of the audit review and are not necessarily a comprehensive statement of all
the weaknesses that exist or all improvements that might be made. Recommendations
for improvements should be assessed by management for their full impact before they
are implemented. The performance of the audit review undertaken should not be taken
as a substitute for management’s responsibilities for the application of sound
management practices. 
This report must not be disclosed to any third party or reproduced in whole or in part
without the written consent of the Moray Council’s Service Manager Internal Audit and
Risk. 
Page 156

Page 157

Report to: Audit and Scrutiny
Committee 
Meeting Date: 29 September 2026     
Report by: Service Manager Internal Audit and Risk      
Author: Dafydd Lewis Contact Email: dafydd.lewis@moray.gov.uk 
Subject: Internal Audit Review – Social Care (Short Breaks) 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The report advises Committee on an internal audit review completed for the               period from
18 June 2026 to 29 September 2026.  
1.2  This report is submitted to Committee in terms of Section III (I) (2) and (8) of the Council’s
Scheme of Administration relating to consideration of reports from the Council’s Internal
Auditor and monitoring delivery of the audit service through receipt of quarterly reports on
work carried out by Internal Audit.  
2.  SUMMARY  
2.1  This report provides details of the internal audit review of Social Care (Short Breaks),
which was agreed for review within the Audit Plan.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee considers the contents of this report, seeks
clarification on any points noted and endorses the recommendations contained
within the report.   
Dafydd Lewis
Service Manager Internal Audit and Risk 
4.  BACKGROUND AND CONTEXT  
4.1  An Internal Audit review of accommodated Social Care (Short Breaks) has been
completed as part of the 2025/26 Internal Audit Plan. The Scottish Government defines a
Short Break as any form of service or assistance that enables carers to have periods away
from their caring routines or responsibilities. The audit primarily focused on
Item 9.
Page 157

Page 158

accommodated Short Breaks within the older persons’ care sector.  
4.2  The scope of the audit reviewed the processes in place for assessing care needs and for
ensuring accurate payments are made to third-party providers for accommodated Short
Breaks at agreed contract rates. In addition, the audit checked whether the arrangements
for charging supported persons' contributions towards the cost of applicable Short Break
provision comply with Scottish Government charging guidance. The detailed findings and
recommendations from this review are set out within the audit report in Appendix 1.  
5.  PROPOSALS  
5.1  It is recommended that Committee agree to note the progress made by Internal Audit in
the period from 18 June 2026 to 29 September 2026. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  ×
Policy and Legal  ×
Financial  ×
Risk × 
Staffing  ×
Best Value and Transformation × 
Property  ×
Information Communications Technology/Digital     ×
Equalities. Social Inclusion and Economic Impact   ×
Climate Change and Biodiversity Impact  × 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population
Page 158

Page 159

6.3  Policy and Legal 
No implications directly arising from this report.  
6.4  Financial 
No implications directly arising from this report. 
6.5  Risk
The independent review of selected systems and procedures mitigates  the risks
associated with inadequate or ineffective control procedures. 
6.6  Staffing
No implications directly arising from this report. 
6.7  Best Value and Transformation
Internal audit work supports good governance and the delivery of efficient services. 
6.8  Property
No implications directly arising from this report. 
6.9  Information Communications/Technology/Digital Property
No implications directly arising from this report. 
6.10 Equalities, Social Inclusion and Economic Impact     
No implications directly arising from this report.        
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
Page 159

Page 160

There are no direct equalities, social inclusion or economic impacts arising from this report.
However, the work of Internal Audit contributes to the effectiveness of governance, risk
management and control arrangements across the Council, which support the delivery of
equitable, inclusive and sustainable outcomes for communities. 
6.11 Climate Change and Biodiversity Impacts 
No implications directly arising from this report. 
7.  CONSULTATION  
7.1  There have been no direct consultations during the preparation of this report.  
8.  BACKGROUND PAPERS  
8.1  None   
Page 160

Page 161

APPENDIX 1
1
Final Internal Audit Report
Social Care (Short Breaks) 
June 2026 
Distribution: Chief Finance Officer – MIJB
Locality Manager – West
Team Manager (East Community Care)
Team Manager (West Community Care)
Unpaid Carers Team Manager
The Internal Audit Section provides Management with an opinion on the internal control environment
and also categories risk ratings for recommendations as high, medium or low (detailed explanation
provided in Appendix1). The audit recommendations for this review have been classified as follows
Assurance Level Risk Ratings for
Recommendations
Substantial
Priority 1 2
Priority 2 1
Priority 3 1
Confidentiality and Disclosure Clause
This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only
those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information
provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings
on the information and documentation provided and consequently, no complete guarantee can be given that this Report is
necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required.
This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian
Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party
who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation,
amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract,
reinterpretation, amendment and/or modification by any third party is entirely at their own risk.
Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities,
limitations and confidentiality.
Page 161

Page 162

Appendix 1 
2
Contents 
Page
Social Care (Short Breaks)   
1. Introduction & Scope 3
2. Key Issues  3-4 
Detailed Report 
3. Findings/Recommendations 5-11
4. Management Response 6-11 
Appendices 
1. Audit Terms of Reference and Definitions 
2. Statement of Responsibility 
Page 162

Page 163

Appendix 1 
3
1. Introduction and Audit Scope 
An Internal Audit of accommodated Social Care (Short Breaks) has been
undertaken as part of the 2025/26 coverage of Moray Integration Joint Board
(MIJB) activity. There has been a requirement to further develop the audit
programme for this review, as the original scope was to assess the processes
and accounting arrangements for charging care to individuals receiving a service.
However, it was noted early in the audit process that a review is currently ongoing
within the Service to explore charging arrangements for Social Care services. The
audit has therefore been expanded to review the procedures and administrative
arrangements in procuring accommodated Short Breaks for individuals requiring
support in a care home environment for an intended temporary period. Short
Breaks are a common feature in delivering support for Unpaid Carers under the
authority's responsibilities established by "The Carers (Scotland) Act 2016". The
audit has mainly focused on accommodated Short Breaks for the older persons
care sector, attracting an annual budget provision of £517,000 for the 25/26
financial year.   
The audit examined the processes in place for assessing care needs and for
ensuring accurate payments are made to third-party providers for accommodated
Short Breaks at agreed contract rates. In addition, the review assessed whether
the arrangements for charging supported persons contributions towards the cost
of applicable Short Break provision are compliant with Scottish Government
charging guidance. 
This audit review covers a further sector of residential care service provision and
complements recent audit activity on Out of Area Placements, Older Persons
Permanent Residential Care and Procurement & Creditor Payments, ensuring
substantial coverage of residential care over consecutive Internal Audit Plans. 
The audit was carried out in accordance with the Global Internal Audit Standards
(GIAS). 
2. Key Issues 
• In accordance with the Scottish Government Charging for Residential
Accommodation Guidance (CRAG), local authorities have discretion to
apply charges for Short Break provision, however Scottish Government
regulations waive charging where the support is provided to meet the
needs of unpaid carers or for individuals with a terminal illness within
specific parameters. The audit identified that no supported individuals
receiving a Short Break service within a care home setting were referred
Page 163

Page 164

Appendix 1 
4
for a financial assessment during 2025/26. Consequently, no charges
were applied in respect of contributions towards the cost of Short Break
provision. Audit testing confirmed that the sample reviewed included
Short Break cases that would be eligible for charging under CRAG,
including extended stays in care home settings spanning several
months. These arrangements were in place for reasons including delays
in the commencement of community care packages and pending
decisions regarding permanent care home placement. While the current
financial climate and the sensitivity associated with charging for social
care services are acknowledged, management should consider
exploring the implementation of charging for eligible services.   
• The Carers (Scotland) Act 2016 requires local authorities to ensure that
carers receive the necessary support to maintain their wellbeing while
providing care. As recognised good practice, Carer Support Plans
provide a formal mechanism to document carers' needs and personal
outcomes, separately from the supported person's care and Support
Plan. While the audit identified that Short Breaks were being provided to
support unpaid carers, audit testing found that, in the majority of cases
reviewed, a Carer Support Plan was not in place to substantiate the
carer’s assessed needs. Further promotion and development of Carer
Support Plans would strengthen the identification of carers' needs and
outcomes, support the sustainability of caring arrangements, and
provide clear evidence of appropriate assessment, decision-making and
agreed support.   
Page 164

Page 165

5 
Findings/Recommendations - Social Care (Short Breaks)  2025/26 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
1 High The Charging for Residential Accommodation
Guidance (CRAG) issued by Scottish
Government provides for temporary residents,
defined "such as respite", which aligns with the
provision of accommodated Short Breaks.
CRAG states that for temporary residents,
undertaking a financial assessment of ability to
pay for the first 8 weeks is at local authority
discretion. If a financial assessment is made it
must follow CRAG but if no assessment is
undertaken a local authority can charge an
amount that appears reasonable for the
supported person to pay. After 8 weeks, an
assessment of ability to pay, under CRAG
conditions, must be carried out. However,
Scottish Government regulations waive
charging for breaks which support unpaid
carers or those with terminal illness within
specific parameters. 
The Authority currently has no charging policy
in place for Short Break provision. The audit
identified that no referrals for financial
A formal charging policy for
accommodated Short Break provision
should be introduced, compliant with
CRAG, including clear criteria for when
financial assessments and charges apply
and when exemptions are required.   
Page 165

Page 166

6 
assessment were undertaken in respect of
Short Break provision during the 2025/26
financial year. Consequently, no charges are
levied to individuals receiving a service to
recover contributions towards the cost of Short
Break social care. The audit review noted that,
based on research undertaken, other local
authorities have charging policies in place for
accommodated Short Break provision. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Locality Manager - West Yes 31/05/2027 There is a short life working group which
was formulated prior to the audit due to
identification of the need to consider a
charging policy and guidance for short
breaks. This group will progress with
recommendations from the Short Breaks
audit with regard to charging policy
development. 
Page 166

Page 167

7 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
2 High Audit testing identified expenditure recorded as
Short Break provision which, on further
analysis, related to individuals remaining in
residential accommodation for extended
periods ranging from five to sixteen months.
Short Breaks are typically intended to provide
time-limited respite support, depending on
assessed need. In the majority of cases
reviewed, individuals initially presented for a
Short Break, however subsequent changes in
circumstances or care requirements resulted in
these arrangements being extended while
decisions regarding future care were pending.
Despite these changes, the cases continued to
be classified and funded as Short Breaks.
Enquiries with the Service identified instances
where Short Break provision had been
approved due to the unavailability of community
care packages or where it was used as an
interim measure pending permanent residential
care placement. It is noted that the Service is
currently undertaking work to reclassify Short
Break provision within CareFirst and the
Financial Management System. This work aims
to distinguish between planned, emergency and
Short Break placements should be subject
to timely review and if required
reclassification. Financial assessments
should be undertaken in line with the
charging policy to be developed. 
Page 167

Page 168

8 
interim Short Breaks and to improve service
planning, budgeting, and the quality of
management information. Under this revised
approach the extended stays described above
will be categorised as Short Breaks - Interim. As
described in Finding 1, a recommendation has
been made to consider the development of a
charging policy for Short Break provision.
However, audit testing found that, irrespective
of the length of stay for individuals classified as
receiving Short Breaks, financial assessments
are only undertaken once individuals are
reclassified as receiving community-based care
or permanent residential care. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Locality Manager - West Yes 31/05/2027 As referred to in recommendation 1 above,
the short life working group will support
progression of an updated charging policy
and guidance. The short break definition
and classifications will be monitored via
the existing Resource Allocation Meeting
(RAM) structure. 
Page 168

Page 169

9 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
3 Medium The audit review noted that Short Breaks are
used to support unpaid carers. Under "The
Carers (Scotland) Act 2016", the Authority has
a duty to ensure that carers receive the support
necessary to maintain their wellbeing while
providing care. Carers are also entitled to a
Support Plan, which formally identifies and
documents their needs and outcomes. An Adult
Carer Support Plan is not required in order for
an Unpaid Carer to receive support but is
considered an important tool in improving
support for unpaid Carers to access the
necessary resources and formally recognise
their role in line with the aims of The Carers Act.
Audit testing found that in the majority of the
cases sampled where Unpaid Carer support
was stated as the reason for the need for Short
Break, an Adult Carers Support Plan was not in
place to substantiate the Carers needs. 
At the time of the audit, a pilot project was in
operation within a Social Care team to develop
separate Adult Carer Support Plans alongside
Where Short Breaks are provided to
support unpaid carers, Carer Support
Plans should be promoted and developed
to formalise carers' needs and support the
delivery of personalised outcomes-
focused support. 
Page 169

Page 170

10 
the Cared For Person's Needs Assessment.
Activity is also ongoing to separate costs of
supporting Carers on a more refined basis for
service planning and information availability. A
future audit review of Support for Carers is
planned and will be included within a future
Internal Audit Plan.
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Unpaid Carers Team
Manager
Yes 31/03/2027 Governance for this action will primarily be
through the Unpaid Carers Strategy Oversight
Group and linked to the Self-Directed Support
Standards Steering Group. Work is already
underway in relation to the separate recording
on the CareFirst system to ensure a clear
distinction between supports for the cared for
person and for the unpaid carer. A temporary
work around is currently in place until the move
to the new Social Care recording system,
Mosaic, is complete. A test of change is
currently in place in relation to recording
supports for the unpaid carer via an Adult
Carer Support Plan. 
Page 170

Page 171

11 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
4 Low During the audit review, instances of inaccurate
recording of Short Breaks were identified within
the CareFirst system. CareFirst is the primary
information system used for the management of
social care packages. Inaccuracies included
end dates not being updated to reflect approved
extensions or differences between planned and
actual end dates, end dates not being entered,
and services not being correctly categorised as
Short Breaks. While the limitations of the
CareFirst system are acknowledged, and it is
noted that a replacement social care case
management system has been procured with
implementation planned by March 2027, the
requirement for accurate and complete data
input remains.  
Officers should be reminded of the
importance of accurate and complete data
recording within the CareFirst system of
Short Breaks, as it is the primary system
used to record social care activity and to
support the validation of payments for care
provided.   
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Team Managers – East &
West Community Care
Yes 31/01/2027 Team Managers will support operational staff
to undertake learning and refresher
opportunities surrounding accuracy of
recording and its importance within their role. 
Page 171

Page 172

12 
Appendix 1 
AUDIT TERMS OF REFERENCE AND DEFINITIONS 
1. Audit Objectives 
1.1 The overall audit objective is to provide an objective independent opinion on
the adequacy and effectiveness of controls / processes.  
1.2 The audit will for each controls / process being considered: 
• Walkthrough the processes to consider the key controls; 
• Conduct sample testing of the identified key controls, and 
• Report on these accordingly 
1.3 All audit reviews are carried out in accordance with Global Internal Audit
Standards (GIAS). 
2. Definitions for Auditing Opinions and Findings 
2.1 In order to assist management in using our reports: 
The Internal Auditor will categorise audit assurance opinion according to
their overall assessment of the risk management system, effectiveness of the
controls in place and the level of compliance with these controls and the action
being taken to remedy significant findings or weaknesses. 
Assurance
Level
System and Testing Conclusion
Full The controls tested are being consistently applied
Substantial There is evidence that the level of non compliance with some of the
controls may put some of the system objectives at risk.
Limited The level of non compliance puts the system objectives at risk.
None Significant non-compliance with basic controls leaves the system
open to error or abuse. 
2.2 Risk ratings for each recommendation is based on the following criteria: 
High Fundamental control weaknesses that require immediate attention by
management to action and mitigate significant exposure to risk
Medium Less critically important controls absent, not being operated as
designed or could be improved
Low Lower level controls absent, not being operated as designed or could
be improved.
Page 172

Page 173

13 
Appendix 2 
STATEMENT OF RESPONSIBILITY   
The responsibility for designing and maintaining a sound system of internal control to
prevent and detect fraud and other irregularities rests with management, with internal
audit providing a service to management to support them to achieve this objective.
The Internal Audit Section will assess the adequacy and effectiveness of the system
of internal control arrangements implemented by management and perform sample
testing on those controls in the period under review with a view to providing an opinion
on the extent to which risks in this area are managed. 
The Internal Audit Section will undertake testing with the objective of detecting
significant control weaknesses. However, the audit approach alone should not be
relied upon to identify all strengths and weaknesses in internal controls nor to find any
fraud or irregularity. Even sound systems of internal control can only provide
reasonable and not absolute assurance and may not be proof against collusive fraud. 
The matters raised in this report are only those that came to our attention during the
course of the audit review and are not necessarily a comprehensive statement of all
the weaknesses that exist or all improvements that might be made. Recommendations
for improvements should be assessed by management for their full impact before they
are implemented. The performance of the audit review undertaken should not be taken
as a substitute for management’s responsibilities for the application of sound
management practices. 
This report must not be disclosed to any third party or reproduced in whole or in part
without the written consent of the Moray Council’s Service Manager Internal Audit and
Risk. 
Page 173

Page 174

Page 174

Page 175

Report to: Audit and Scrutiny
Committee 
Meeting Date: 29 September 2026  
Report by: Executive Director Finance, Strategy and Transformation  
Author: Susan Souter  Contact Email: Susan.souter@moray.gov.uk 
Subject: Treasury Management Performance and Treasury and Capital
Investment Prudential Indicators for 2025/26 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to provide Committee with the annual outturn report on
Treasury Management and details of the Council’s Prudential Indicators for Treasury
Management and Capital Investment for the year ended 31 March 2026.  
1.2  This report is submitted to Committee in terms of Sections III B (9) of the Council's
Scheme of Administration relating to Treasury Management and the Capital Plan.  
2.  SUMMARY  
2.1  The Treasury Management Policy and Strategy and the Investment Strategy for 2025/26,
along with the Prudential Indicators for 2025/26, were approved at Moray Council on 26
February 2025 (paragraph 5 of the Minute refers). Revised indicators were reported to
Moray Council on 25 February 2026 when Council approved  the above mentioned
strategies for 2026/27 (paragraph 7 of the Minute refers). 
2.2 During 2025/26 the UK economy experienced modest growth, although the pace of growth
slowed as the year progressed. Inflation remained above the Bank of England’s 2% target
for much of the year but eased towards the end of the period. In response to improving
inflationary conditions and weaker economic growth, the Bank Rate reduced from 4.50%
at the start of the financial year to 3.75% by 31 March 2026. 
2.3 During 2025/26 the Council continued to maintain a balanced borrowing portfolio through
a combination of short-term inter-authority borrowing and longer-term Public Works Loan
Board (PWLB) borrowing. The availability of preferential rates within the inter-authority
market resulted in an increase in the proportion of short-term borrowing during the year
when compared to long-term borrowing. Treasury management activities were undertaken
Item 10.
Page 175

Page 176

in accordance with the approved strategy whilst ensuring the Council's capital financing
requirements continued to be met. 
2.4 The Prudential Indicator performance for 2025/26 is set out in Appendix 2. The outturn
demonstrates that the Council remained within its approved prudential and treasury
management limits during the year, with the exception of the upper limit for borrowing
maturing within 12 months. This reflected the Council's use of lower-cost short-term
borrowing opportunities and was actively monitored throughout the year. Borrowing and
capital financing costs remained affordable and sustainable. 
2.5 The report provides a mid-point update on the 2026/27 Treasury Management and
Prudential Indicators as approved by Council on 25 February 2026 (paragraph 7 of the
Minute refers) in Appendix 4. 
3.  RECOMMENDATIONS 
3.1  It is recommended that Committee notes the Treasury Management Performance for
2025/26, the Treasury Management and Capital Investment Prudential Indicator
outturn position for 2025/26 as set out in Appendix 2, and the revised Prudential
Indicators for 2026/27 as set out in Appendix 4.   
Susan Souter
Service Manager – Strategic Finance 
4.  BACKGROUND AND CONTEXT  
4.1  The Council has adopted the Chartered Institute of Public Finance and Accountancy
(CIPFA) Treasury Management in the Public Services Code of Practice and Cross-Sectoral
Guidance Notes (the CIPFA Code), revised in 2021, and complies with the Local
Government Investments (Scotland) Regulations 2010 (the Regulations). All treasury
management activities are undertaken in accordance with the CIPFA Code and the
Regulations.  
4.2  The primary requirements of the Code are as follows:   
• An approved Treasury Management Policy, which sets out the policies and objectives
of the Council’s treasury management activities. 
• An annual treasury management strategy report to Council for the year ahead and an
annual review report to Council of the previous year.  
4.3  The Local Government (Scotland) Act 2003 requires the Council to adopt the CIPFA
Prudential Code for Capital Finance in Local Authorities and to produce the prudential
indicators set out in the Prudential Code. These indicators are designed to support and
record affordable and sustainable capital investment and treasury management. 
4.4  The Treasury Management Policy and Strategy and the Investment Strategy for 2025/26
were approved at Moray Council on 26 February 2025 (paragraph 5 of the Minute refers). 
Page 176

Page 177

4.5  The revised indicators for 2025/26 along with the Treasury Management Strategy
Statement and Prudential Indicators for 2026/27 were approved at Moray Council on 25
February 2026 (paragraph 7 of the Minute refers). 
5.  PROPOSALS 
Treasury Performance 2025/26
5.1  This annual Treasury Management performance report covers: 
• The Economy and Interest Rates 2025/26
• Treasury Management Strategy and Performance for 2025/26
• Annual Investment Strategy and Performance 2025/26
• Investment Outturn for 2025/26
• Long Term Borrowing and Debt Rescheduling
• Short Term Borrowing
• Prudential Code for Capital Finance in Local Authorities  
5.2  Current Portfolio Position 
The council’s debt and investment position at the beginning and end of 2025/26 was as
follows:  
1 April 2025  31 March 2026
Principal
£m
Rate
%
Debt Principal
£m
Rate
%
196.854 5.07 Long-term Borrowing (fixed rate) 205.418 5.13
99.000 5.21 Temporary Borrowing (fixed rate) 118.000 4.44 
295.854   Total Debt  323.418 
13.5 years Average Life of Debt  11.8 years     
£m Rate
%
Investments  £m Rate
%
22.730 4.45 Investments 18.295 3.72     
Total debt shown above represents the principal value of loans outstanding. Borrowing
figures reported within the Prudential Indicators are based on the 2025/26 unaudited
accounts and therefore differ slightly due to year-end accounting adjustments.   
The Economy and Interest Rates 2025/26
5.3  During 2025/26 the UK economy continued to grow, although the pace of growth slowed as the
year progressed. Economic performance was stronger in the early part of the year, supported
by growth across the services, production and construction sectors. However, growth
weakened during the second half of the year as business confidence and investment remained
subdued and consumers continued to face cost pressures. Despite these challenges, the
economy remained resilient and avoided recession, although overall growth levels were
relatively modest throughout the period. 
Page 177

Page 178

5.4  The Bank of England (BoE) began the financial year with the Bank Rate at 4.50%. The BoE
continued to ease monetary policy during 2025/26 as economic growth remained modest and
inflationary pressures began to moderate. Bank rate was reduced from 4.25% in May 2025 to
4.00% in August 2025 and again to 3.75% in December 2025. While inflation remained above
the Government’s 2% target for much of the year, weakening economic growth, softening wage
growth and increasing signs of spare capacity in the labour market supported a gradual
reduction in interest rates. By March 2026, Bank Rate remained at 3.75%. 
5.5  Despite reductions in the Bank Rate during 2025/26, long-term borrowing costs remained
relatively high compared to recent years. Market uncertainty around inflation, economic
growth and government borrowing requirements continued to influence PWLB borrowing rates
throughout the year. 
5.6  Quarterly Gross Domestic Product (GDP) growth remained positive throughout most of the
period, although the rate of growth slowed following a strong first quarter. GDP increased by
0.7% in Q1 2025 before slowing to 0.3% in Q2 and 0.1% in both Q3 and Q4. Growth during the
year was supported primarily by the services sector, whilst production and construction
performance varied between quarters. Although household spending showed signs of
resilience, business investment remained subdued and consumer confidence weakened
towards the end of the period. Overall, the economic outlook remained uncertain and growth
levels were modest throughout the year. 
5.7  Consumer Price Index (CPI) inflation fluctuated throughout 2025/26, reflecting both domestic
and global economic pressures. Inflation increased from 2.6% in March 2025 to 3.5% in April
2025, largely due to increases in household costs including energy and water charges, as well
as higher transport and food prices. Inflation remained elevated through much of the summer
and early autumn, reaching 3.8% between July and September 2025. Thereafter, inflationary
pressures gradually eased, with CPI falling to 3.0% by January and February 2026. While
underlying inflation remained above the Bank of England's 2% target throughout the year, the
overall trend towards the end of the period was one of moderation as food, fuel and other price
pressures reduced. 
Annual Investment Strategy
5.8  The Council’s creditworthiness policy was formulated after consultation with Arlingclose,
the Council’s treasury advisers. The Chief Financial Officer maintains a counterparty list
in compliance with the minimum criteria approved by Moray Council on 3 March 2020
(paragraph 4 of the minute refers).  
5.9  All credit ratings are monitored daily, and the Counterparty list amended to reflect any
changes if necessary. An updated Counterparty list is shown in Appendix 3. 
Investment Outturn for 2025/26
5.10  The Council managed its investment in-house and invested with the institutions listed on
the Council’s approved Counterparty list show in Appendix 3.  
5.11  The table below shows the overall investment undertaken by the Council during 2025/26.    
Page 178

Page 179

Total sum
deposited (£m)
Average rate
(%)
Approved Financial Institutions 535.530 4.08
Council’s Bankers 31.953  2.89
TOTAL 567.483  4.04 
5.12  The above figures are cumulative, and the actual amounts invested at any one time range
from £7.800m to £50.440m.  
5.13  The average rate of interest earned on investments during the year was 4.04%, compared to the
average 7 day London Interbank Bid Rate (LIBID) of 3.98%. When the Bank of England base
interest rate increases, the Council’s Bank of Scotland call account rate is increased from that
day, as is the LIBID rate. The money market funds in which the Council invests the balance of
funds takes time to catch up as their interest rates are not set and fluctuate depending on the
market and the size of the investment in each fund. The Council’s investments throughout the
year were in line with the Treasury Management Practices and money deposited in the
approved funds, redeeming from the ones with the lower rates first.  
5.14  As at 31 March 2026, the following balances were invested.   
Counterparty Investment Amount (£m) Interest Rate (%)
Bank of Scotland Call Account 1.000 2.4
Aberdeen Standard Money Market Fund 5.000 3.82
Federated Hermes Money Market Fund 5.000 3.84
Blackrock Money Market Fund 5.000 3.76
CCLA Money Market Fund 2.295 3.75
TOTAL  18.295 3.72 
Long Term Borrowing and Debt Rescheduling
5.15  The Council’s long term external debt position at 31 March 2026 compared with the position at
the end of the last financial year was as follows:    
31 March 2025 31 March 2026 
Actual
(£000)
Rate
(%)
Average
Life
Actual
(£000)
Rate
(%)
Average
Life
Fixed Rate Funding
(PWLB)
163,454 
33,400
5.22 
4.68
14.21 
48.81
172,018 
33,400
5.24 
4.68
12.39 
47.81
Page 179

Page 180

Fixed Rate Funding
(Market)
TOTAL DEBT 196,854  5.07  205,418 5.13 
There was no variable rate borrowing in the year.  
5.16  The Council continued to maintain an under-borrowed position during 2025/26. This means
that the Capital Financing Requirement (CFR) was not fully funded by external borrowing and
the Council continued to utilise cash-backed reserves, balances and cash flows to support its
capital financing requirement on a temporary basis.  
5.17  The Council's borrowing strategy relied heavily on short-term inter-authority borrowing during
2025/26 due to the favourable rates available when compared to long-term borrowing. Whilst
this approach helped minimise borrowing costs, it resulted in the proportion of borrowing
maturing within 12 months exceeding the approved upper limit. The position was monitored
throughout the year and liquidity and refinancing risks remained manageable. The Council
continued to mitigate these risks through a combination of short-term borrowing and longer-
term PWLB borrowing where appropriate.  
5.18  In the financial year 2025/26 £20m of new PWLB borrowing was undertaken. 
5.19  No debt rescheduling was undertaken during the year as the differential between PWLB new
borrowing rates and PWLB premature repayments rates made rescheduling unviable.   
Short Term Borrowing
5.20  During the year, 26 new temporary loans, totalling £118m were borrowed from other UK local
authorities. A table detailing these loans is included at Appendix 1.   
The Prudential Code for Capital Finance in Local Authorities
5.21  The Local Government (Scotland) Act 2003 requires the Council to undertake its treasury
activities with regard to the Prudential Code for Capital Finance in Local Authorities.  
5.22  To comply with the Prudential Code, authorities must not borrow to invest primarily for
financial return. The Prudential Code also states that it is not prudent for local authorities to
make investment or spending decisions that will increase the Capital Financing Requirement
(CFR) unless directly and primarily related to the functions of the authority. Borrowing is
permitted for cash flow management, interest rate risk management, to refinance current
borrowing and to adjust levels of internal borrowing. Borrowing to refinance capital
expenditure primarily related to the delivery of a local authority’s function but where a financial
return is also expected is allowed, provided that financial return is not the primary reason for
the expenditure. 
5.23  The Code requires the Council to produce mandatory indicators aimed at assisting members
in ensuring that proposed capital investment levels and treasury management decision satisfy
the key requirements of affordability, prudence and sustainability. The Prudential Indicators for
2025/26 were approved at Moray Council on 26 February 2025 (paragraph 5 of the Minute
refers). Performance against key indicators is shown in Appendix 2.  
Page 180

Page 181

Prudential Indicators 2026/27
5.24  The Prudential Indicators for 2026/27 were approved by Council on 25 February 2026
(paragraph 7 of the minute refers) based on the estimated outturn position for 2025/26
available at that time. Following completion of the 2025/26 annual accounts and approval of
the Quarter 1 Capital Monitoring Report for 2026/27, the indicators below have been updated
to reflect the latest projected position. 
5.25  The principal changes relate to the final 2025/26 outturn position and the approved carry
forwards incorporated within the 2026/27 capital programme. As a result, revised estimates
have been prepared for capital expenditure, external debt limits, the Capital Financing
Requirement (CFR) and affordability indicators. Despite these revisions, all prudential
indicators remain within the Council's approved affordability and prudential limits.  
6. SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  ✓
Policy and Legal ✓ 
Financial ✓ 
Risk ✓ 
Staffing  ✓
Best Value and Transformation  
Property  ✓
Information Communications Technology/Digital  ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change and Biodiversity Impact  ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
Page 181

Page 182

None specifically arising from this report.   
6.3  Policy and Legal 
The Local Government in Scotland Act 2003 provides the powers to borrow and invest as
well as providing controls and limits on these activities.   
The Council has adopted the CIPFA Prudential Code and the CIPFA Treasury Management
in the Public Services Code of Practice and Guidance Notes (the CIPFA Code) which was
revised in 2021.  The Council also complies with the Local Government Investments
(Scotland) Regulations 2010 (the Regulations). 
All Treasury Management activities are carried out in accordance with the CIPFA Code and
the Regulations. 
6.4  Financial 
There are no direct financial implications as a result of this report. Appendix 2 provides
the outturn results of the investment and borrowing decisions for 2025/26. 
6.5  Risk 
The Council is aware of the risks of passive management of the treasury portfolio and, with
the support of the Council’s treasury advisers, will proactively manage its investments and
debt over the year. 
Capital expenditure is closely monitored, and Budget Managers are aware of their
responsibilities to manage budget allocations.  
6.6  Staffing 
None specifically arising from this report.  
6.7  Best Value and Transformation 
None specifically arising from this report.  
6.8  Property 
None specifically arising from this report.  
6.9  Information Communications/Technology/Digital 
None specifically arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact  
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Page 182

Page 183

Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
The report relates to treasury management activity and prudential indicators only and
does not in itself affect service delivery, staffing, Council Tax levels, housing rents or the
provision of services to any group. Accordingly no differential impact has been identified. 
6.11  Climate Change and Biodiversity Impacts 
None specifically arising from this report. 
7. CONSULTATION  
7.1  This report has been prepared in consultation with Arlingclose, the Council’s treasury
advisors.  
8. BACKGROUND PAPERS  
8.1  All background papers held by Accountancy section.   
Page 183

Page 184

APPENDIX 1 
Short Term Loans Outstanding as at 31 March 2026 
Organisation Maturity
Date
Borrowing
Rate (%)
Amount
(£m)
South Oxfordshire District Council 02/04/2026 4.65 5.00
Local Government Association 28/04/2026 4.60 1.50
Local Government Association 28/04/2026 4.60 1.50
West Of England Combined Authority 11/06/2026 4.60 5.00
Wychavon District Council 26/10/2026 4.25 5.00
Thames Valley Police 17/09/2026 4.25 5.00
Bolton Metropolitan Borough Council 25/06/2026 4.25 5.00
Western Isles Council 23/07/2026 4.25 5.00
Rochford District Council 19/06/2026 4.15 5.00
Vale Of White Horse District Council 10/09/2026 4.10 5.00
Tendring District Council 06/05/2026 4.10 5.00
Wandsworth Borough Council 27/07/2026 4.40 5.00
City of Edinburgh Council 30/07/2026 4.50 5.00
Nottinghamshire Police 21/12/2026 4.50 5.00
Hyndburn Borough Council 05/01/2027 4.60 2.00
West Yorkshire Combined Authority 16/10/2026 4.65 5.00
East Lindsey District Council 21/12/2026 4.65 3.00
Test Valley Borough Council 20/01/2027 4.55 5.00
Somerset Council Pension Fund 05/01/2027 4.55 5.00
Lancashire Combined Fire Authority 03/02/2027 4.55 5.00
Oxfordshire County Council 27/11/2026 4.55 5.00
Northern Ireland Housing Executive 14/12/2026 4.45 5.00
London Borough of Havering 18/12/2026 4.60 5.00
Furness Building Society 16/03/2027 4.60 5.00
East Suffolk Council 08/01/2027 4.60 5.00
Cambridgeshire & Peterborough Combined Authority 26/01/2027 4.60 5.00
TOTAL 118.00
Page 184

Page 185

APPENDIX 2 
TREASURY AND PRUDENTIAL INDICATORS 
External Debt and Treasury Indicators 
1. The Authorised Limit for External Debt 
The authorised limit for external debt is required to separately identify external
borrowing and other liabilities such as Public Private Partnership (PPP), Design,
Build, Finance, Maintain (DBFM) Contracts and finance lease obligations. This limit
provides a maximum figure to which the Council could borrow at any given point
during the financial year. 
Authorised Limit 2025/26
Approved
Indicator
2025/26
Estimated
Indicator
2025/26
Actual 
Maximum 
£000 £000 £000
Borrowing 391,240 410,015 331,256
Other Liabilities 50,342 52,257 57,529
Total External
Debt
441,582 462,272 388,785 
The overall authorised limit for external debt was not breached during 2025/26.
While Other Liabilities exceeded the level originally estimated, primarily due to
changes in lease liabilities recognised under IFRS 16 Leases, total external debt
remained well within the approved limit. 
2. Operational Boundary for External Debt
This indicator is a management tool for in-year monitoring and is based on an
estimate of the most likely level of external borrowing at any point during each year.
The estimated indicators are based on the approved capital plan as part of the
Council’s budget setting process. The actual is based on the capital expenditure in
the year and there was slippage in various projects which has resulted in a variance.
Operational
Boundary
2025/26
Approved
Indicator
2025/26
Estimated
Indicator
2025/26
Actual 
Maximum 
£000 £000 £000
Borrowing 376,240 405,015 331,256
Other Liabilities 49,342 51,257 57,529
Total External
Debt
425,582 456,272 388,785
The overall operational boundary for external debt was not breached during
2025/26. Although Other Liabilities were higher than estimated, total external debt
remained within the approved operational boundary and borrowing levels were
significantly below the approved limit due to slippage within the capital programme.
Page 185

Page 186

3. Actual External Debt 
This is measured at the end of each financial year. The actual external debt reported
in the annual accounts for the previous year is required to be shown as an indicator
for comparison purposes only. 
Actual Debt At 31 March
2025
At 31 March
2026 
£000 £000
Borrowing 299,057 326,256
Other Liabilities 58,555 57,529
Total External Debt 357,612 383,785 
Other Liabilities include the PPP finance liability for Elgin Academy and Keith
Primary School, the DBFM finance liability for Elgin High School and other
miscellaneous finance lease payments as required by IFRS 16 Leases.
The borrowing figures in the Prudential Indicators are based on the audited
accounts and therefore differ slightly from the loan balances reported elsewhere in
this report due to year-end accounting adjustments.
4. Treasury Management Indicator
There are four treasury prudential indicators, the purpose of which is to contain the
activity of the treasury function within certain limits, thereby managing risk and
reducing the impact of an adverse movement in interest rates. However, if these are
set to be too restrictive, they will impair the opportunities to reduce financing costs.
The indicators are: 
• Upper limits on variable rate exposure – This indicator identifies a maximum limit
for variable interest rates based upon the debt position net of investments. 
• Upper limits on fixed interest rate exposure – Similar to the previous indicator this
covers a maximum limit on fixed interest rates. 
• Maturity structures of borrowing – These gross limits are set to reduce the
Council’s exposure to large fixed rate sums falling due to refinancing within the
same financial year, and are required for upper and lower limits. 
• Maximum period of investment - Following changes arising from the new
Investment Regulations applicable from 1 April 2010, the Council can invest for
periods longer than 364 days. The Council does not currently take advantage of this
change and so has set a limit of Nil for investing over 364 days. 
Page 186

Page 187

Fixed and Variable Rate Limits 
2024/25
Actual
2025/26
Approved Limits
2025/26
Actual
Interest Rate Exposure Upper Limit Upper Limit Upper Limit
Limits on fixed interest
rates based on net debt
100% 100% 100%
Limits on variable
interest rates based on
net debt
0% 35% 0% 
Maturity Structure of Fixed Interest Rate Borrowing 
2024/25
Actual 
2025/26
Approved
Limits
2025/26
Actual (£m)
2025/26
Actual 
Lower Upper  
<12 months 37.84% 0% 37% 139.444 42.74%
12-24 months 6.38% 0% 20% 30.116 9.23%
2-5 years 9.26% 0% 25% 27.385 8.39%
5-10 years 12.65% 0% 50% 30.764 9.43%
>10 years 33.87% 0% 85% 98.547 30.21% 
The upper limit for borrowing maturing within 12 months was exceeded during
2025/26 due to the Council's continued use of short-term inter-authority
borrowing. This reflected the significant differential between short-term and long-
term borrowing costs during the year. The breach was monitored, and no
additional risk to the Council's affordability or liquidity position arose. 
Maximum Principal Sums Invested Greater than 364 days 
2024/25
Actual
2025/26
Actual
Principal sums invested >364 days £0m £0m 
Page 187

Page 188

Capital Expenditure Indicators 
5. Capital Expenditure
This indicator is included so the Council complies with the Local Government in
Scotland Act 2003 which requires the Council to establish and keep under review
capital investment plans which are affordable. 
2025/26
Approved
Indicator
2025/26
Revised
Indicator
2025/26
Revised
Capital
Plan
2025/26
Actual 
£000 £000 £000 £000
Capital Expenditure:    
General Services 64,045 46,995 50,564 32,855
HRA 37,767 38,005 40,639 31,655
Total Capital Expenditure 101,812 85,000 91,203 64,510     
Financed by:    
Capital Receipts 100 1,215 100 565
Capital Grant & Contributions 54,443 31,910 35,376 23,771
Revenue 3,550 3,512 3,849 3,613
Total Funding 58,093 36,637 39,325 27,949
Net Financing Need for the
year 
43,719 48,363 51,878 36,562 
The General Service Capital Programme for 2025/26 final approved amount was
£50.564m. Expenditure for the year was £32.855 million, representing a delivery
rate of 65% of the final programme. The shortfall was largely due to the reprofiling of
expenditure across a number of major capital projects, including the Learning
Estate, Moray Growth Deal and other property and infrastructure projects, resulting
in expenditure being carried forward into future financial years.
HRA spend in the same period was £31.655m against a revised capital plan of
£40.639m, representing a 78% delivery rate. The underspend was mainly due to
slippage within the planned capital maintenance and new build housing
programmes, with expenditure reprofiled into future financial years. Ongoing
challenges around contractor availability, internal resources and tenant
permissions also affected delivery of elements of the programme.  
Page 188

Page 189

Prudence Indicators 
6. Gross Debt and the Capital Financing Requirement
This indicator records the extent that gross debt is less than the capital financing
requirement. This indicator shows prudence by demonstrating that over the
medium term external borrowing is used only for a capital purpose. The values are
measured at the end of each financial year. Debt is the sum of external borrowing
and other liabilities relating to the financing of assets (i.e. PPP, DBFM and finance
leases). 
The Capital Financing Requirement (CFR) represents the Council's underlying need
to borrow to fund capital investment. It increases when new borrowing is required
to fund capital expenditure and reduces over time through annual repayments
charged to revenue. Comparing the CFR with the Council's actual debt position 
helps demonstrate that borrowing remains prudent and is being used to support
capital investment rather than day-to-day spending. 
2024/25
Actual
2025/26
Approved
Indicator
2025/26
Revised
Estimate
2025/26
Actual 
£000 £000 £000 £000
Borrowing 299,057 314,134 333,573 326,256
Other Liabilities 58,555 48,342 50,527 57,529
Gross Debt 357,612 362,476 384,830 383,785
CFR 383,054 432,935 418,012 428,280     
Under Limit by 25,442 61,459 33,182 44,495 
The above figures confirm that the Council’s borrowing is under the Capital
Financing Requirement. 
Page 189

Page 190

Affordability Indicators
7. Ratio of Financing Costs to Net Revenue Stream 
This is an indicator of affordability and calculates the proportion of the net revenue
budget required to finance the costs associated with borrowing and investment and
is calculated by taking the total financing costs, including the costs of PPP/DBFM
schemes as a proportion of the income received by the Council. The Council has
set a limit of 10% for General Services and 35% for the HRA. The relevant
proportions are set out below. 
2024/25
Actual
2025/26
Approved
Indicator
2025/26
Revised
Indicator
2025/26
Actual
General Services 10.63% 8.90% 9.43% 8.62%
HRA 30.00% 29.72% 29.79% 29.06% 
For General Services, the indicator reduced from 10.63% in 2024/25 to 8.62% in
2025/26 and remained below the Council's affordability threshold of 10%. The
reduction reflects lower financing costs than originally estimated together with the
continued management of borrowing requirements and delivery of the capital
programme.
For the Housing Revenue Account, the indicator was 29.06% for 2025/26,
compared with the approved indicator of 29.72% and remains within the Council's
affordability threshold of 35%. The indicator reflects the ongoing investment in the
Council's housing stock and new build housing programme whilst remaining within
the limits set as part of the Housing Revenue Account Business Plan.
Both indicators were therefore within the approved affordability limits during
2025/26.  
Page 190

Page 191

8. Estimates of Incremental Impact of New Capital Investment Decisions on
Council Tax and House Rents 
This Prudential Code indicator provides an illustration of the impact that changes in
capital financing costs could have on Council Tax and housing rents. It is a
theoretical measure used to demonstrate affordability and does not represent
actual changes to Council Tax or rent levels. 
Impact including all finance
costs
2024/25
Actual
2025/26
Approved
Indicator
2025/26
Revised
Indicator
2025/26
Actual
Council Tax – Band D £234.13 £0.85 (£40.26) (£58.02)
Average Weekly Housing Rents £7.36 £3.85 £1.05 £1.09 
This indicator is a Prudential Code measure that compares financing costs with the
previous year and illustrates the theoretical impact on Council Tax and housing
rents. The negative Council Tax figure reflects lower financing costs than in the
previous year and does not represent an actual reduction in Council Tax. Similarly,
the housing rent figure is an illustrative indicator rather than a direct change in
rents. 
Page 191

Page 192

APPENDIX 3
UK Banks Limit (£m) Time Limit
Bank of Scotland (Lloyds) 10 Call
Barclays Bank 5 35 days
HSBC 5 35 days
Lloyds Bank 5 35 days
National Westminster Bank (RBS) 5 35 days
Royal Bank of Scotland 5 35 days
Santander (UK) 5 35 days
Standard Chartered Bank 5 35 days
UK Building Societies
Nationwide 5 35 days
Other Institutions
Debt Management Office Unlimited 6 Months
UK Local Authorities 5 2 years
Money Market Funds
Standard Life Sterling Liquidity Fund 5 Call
Federated Sterling Prime Fund 5 Call
Blackrock Institutional Sterling
Liquidity Fund 5 Call
Insight Sterling Liquidity Fund 5 Call
Deutsche Bank Managed Sterling
Fund 5 Call
CCLA Public Sector Deposit Fund
(UK) 5 Call
Notes
1.The long term ratings for each institution above are in the format Fitch/ Moodys/ Standard & Poor.
The minimum ratings are as follows: -
Fitch: BBB+
Moodys: Baa1
Standard & Poor: BBB+
THE MORAY COUNCIL
APPROVED COUNTERPARTIES LIST
Page 192

Page 193

APPENDIX 4 
TREASURY AND PRUDENTIAL INDICATORS 2026/27
1. Capital Expenditure
The revised capital expenditure estimates reflect the latest approved capital plan
for 2026/27, including the reprofiling of expenditure from 2025/26 and any
amendments approved through the capital monitoring process. 
2025/26
Actual
2026/27
Approved
Indicator
2026/27
Revised
Indicator 
£000 £000 £000
Capital Expenditure:   
General Services 32,855 67,894 77,294
HRA 31,655 44,454 44,454
Total Capital Expenditure 64,510 112,348 121,748    
Financed by:   
Capital Receipts 565 100 100
Capital Grant & Contributions 23,771 39,333 48,255
Revenue 3,613 4,563 4,563
Total Funding 27,949 43,996 52,918
Net Financing Need for the
year 
36,562 68,352 68,830 
2. The Authorised Limit for External Debt 
Authorised Limit 2025/26 Actual 2026/27
Approved
Indicator
2026/27
Estimated
Outturn 
£000 £000 £000
Borrowing 331,256 494,895 405,912
Other Liabilities 57,529 51,655 50,257
Total External
Debt
388,785 546,550 458,169 
The revised Authorised Limit reflects the latest forecast borrowing requirement and
other liabilities arising from the updated capital programme and remains sufficient
to accommodate the Council's anticipated borrowing and treasury management
activities during 2026/27. 
Page 193

Page 194

3. Operational Boundary for External Debt 
Operational
Boundary
2025/26 Actual 2026/27
Approved
Indicator
2026/27
Estimated
Outturn 
£000 £000 £000
Borrowing 331,256 479,895 400,912
Other Liabilities 57,529 50,655 51,257
Total External
Debt
388,785 530,550 452,169 
The revised Operational Boundary reflects the Council's latest estimate of the most
likely level of external debt during 2026/27 and remains within the revised
Authorised Limit. 
4. Gross Debt and Capital Financing Requirement
The revised CFR reflects the actual closing CFR at 31 March 2026 together with the
latest forecast capital expenditure for 2026/27. 
2025/26
Actual
2026/27
Approved
Indicator
2026/27 
£000 £000 £000
Borrowing 326,256 389,752 395,912
Other Liabilities 57,529 49,655 49,257
Gross Debt 383,785 439,407 445,169
CFR 428,280 472,589 485,369    
Under Limit by 44,495 33,182 40,200 
The revised CFR has increased compared with the approved indicator, primarily
reflecting the impact of capital expenditure reprofiled from 2025/26 together with
the actual closing CFR at 31 March 2026. Gross debt remains below the CFR,
demonstrating compliance with the Prudential Code requirement that borrowing is
undertaken for capital purposes.
5. Ratio of Financing Costs to Net Revenue Stream 
2025/26
Actual
2026/27
Approved
Indicator
2026/27
Estimated
Outturn
General Services 8.62% 9.27% 7.89%
HRA 29.06% 32.17% 33.78% 
The revised affordability indicators remain within the Council's approved limits of
10% for General Services and 35% for the HRA. 
Page 194