Democracy Spraffa

Agenda Document Pack - Moray Council - 28/09/2022

Moray Council · 28 September 2022
Back to Moray Council — 28 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Moray Council 
Wednesday, 28 September 2022 
NOTICE IS HEREBY GIVEN that a Meeting of the Moray Council is to be held at
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Wednesday,
28 September 2022 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 16 - 18 of
business on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4. Minutes 
4a. Minute of meeting of 10 August 2022 7 - 26
4b. Minute of Special Meeting of 14 September 2022 27 - 34
5. Notice of Motion - Sky Lanterns and Balloon Releases 35 - 36
6. Notice of Motion - Warm Banks 37 - 38
7. Written Questions ** 
8. Appointments to Committees
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
39 - 44
Page 1

Page 2

9. Corporate Plan Progress Update 2021-22
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
45 - 64
10. Office Review Update - Smarter Working
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
65 - 82
11. Flexible Working Policy Review
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
83 - 98
12. Moray Learning Estate Strategy 2022-2032
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
99 -
114
13. Treasury Management Performance Indicators 2021-22
Report by Depute Chief Executive (Economy, Environment and
Finance)  
115 -
130
14. Moray Growth Deal Housing Mix Delivery Project
Procurement Requirement
Report by Depute Chief Executive (Economy, Environment and
Finance)  
131 -
134
15. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
16. Learning Estate - Primary School Proposal [Paras 1 and
12]
• Information relating to staffing matters;
• Information relating to instructions to counsel any opinion of
counsel and any advice received, information obtained or action to
be taken in connection with any legal proceedings; 
Page 2

Page 3

17. Moray Affordable Housing Programme - Property
Acquisition [Para 9]
• Information on terms proposed or to be proposed by or to the
Authority; 
18. Hydrogen Research [Para 9]
• Information on terms proposed or to be proposed by or to the
Authority; 
Any person wishing to attend the meeting should contact customer services
on 01343 563217 prior to the meeting as the number of attendees is restricted
due to the recent Covid pandemic 
You can however watch the webcast of the meeting by going to :
http://www.moray.gov.uk/moray_standard/page_43661.html 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

THE MORAY COUNCIL 
Moray Council 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Donald Gatt  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Peter Bloomfield  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Neil McLennan  (Member)
Councillor Shona Morrison  (Member)
Councillor Bridget Mustard  (Member)
Councillor Derek Ross  (Member)
Councillor Draeyk Van Der Horn  (Member)
Councillor Sonya Warren  (Member)
Councillor Ben Williams  (Member)  
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Moray Council 
Wednesday, 10 August 2022 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe, Councillor
John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith,
Councillor Scott Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Neil McLennan, Councillor Shona Morrison,
Councillor Bridget Mustard, Councillor Kathleen Robertson, Councillor Derek Ross,
Councillor Draeyk Van Der Horn, Councillor Sonya Warren, Councillor Ben Williams 
APOLOGIES 
Councillor Christopher Price 
IN ATTENDANCE 
Also in attendance at the above meeting were the Chief Executive, Depute Chief
Executive (Economy, Environment and Finance), Chief Financial Officer, Legal
Services Manager, Consultancy Manager, Environmental Protection Manager,
Sport and Culture Service Manager, Emma Gordon, Planning Officer and Tracey
Sutherland, Committee Services Officer.   
1.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 19 of business on the
grounds that it involves the likely disclosure of exempt information of the class
described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.  
Para number of the
minute Para Number of Schedule 7a
23  
8 and 9  
Information on proposed terms and/or expenditure to be
incurred by the Authority 
2.         Appointment of Chair 
The Chief Executive welcomed Members to the meeting and addressed the
meeting on the question of the Chair.  It was his understanding that Councillor
Robertson had been nominated to take the chair for the meeting following the
resignation of Councillor Macrae as Convener.  .  
Item 4a.
Page 7

Page 8

In the absence of a Chair it was for the members of the Council to vote on who
should chair the meeting.  The Chief Executive, wanted to be assured, in terms of
good governance that there were no question arising from the proposal.  
The Chief Executive sought clarification from the Council on whether there was a
question to be resolved or was it unanimously agreed that Councillor Robertson
would take the Chair for the purposes of the meeting.  
The proposal for Councillor Robertson to take the Chair was unanimously agreed.  
Councillor Robertson subsequently took the Chair for the remainder of the
meeting.  
3.         Congratulations 
The Council joined the Chair in acknowledging the great success of the exam
results yesterday and thanked all the teaching staff throughout Moray for their hard
work and effort in what has been a very difficult year with the pandemic and wish
all the young people every success in whatever their chosen destination maybe.    
4.         Declaration of Group Decisions and Members Interests * 
Councillor Robertson confirmed that the Conservative Group had discussed  and
considered all items on the agenda but no whip had been given to members on
how they should vote.  
In terms of Standing Order 20 and the Councillors’ Code of Conduct, Councillor
Mustard declared an interest in Item 7 – Notice of Motion – Elgin Bypass as it
makes reference to the preferred A96 route which personally affects her and will
therefore not take part in the discussion of the item and will leave the Chamber for
the duration of that item.    
There were no other declarations from Group Leaders or Spokespersons in regard
to any prior decisions taken on how Members will vote on any item on the agenda
or any declarations of Member’s interests in respect of any item on the agenda. 
5.         Minute of meeting of 29 June 2022 
The Chair updated the Council on a number of outstanding queries from the previous
meeting about Outside Bodies:  
Knockando Woollen Mill The Head of Economic Growth and
Development confirmed that a
nomination was not required.  
Highland and Moray Area Support
Team
The organisation confirmed that only 1
representative was required.  
Moray Economic Partnership Only 1 representative required – the
partnership is currently reviewing their
membership  
Page 8

Page 9

Scottish Joint Council for Local
Government Employees
A representative is required.
Previously Councillor A McLean had
been attending the meetings. It is
proposed to pair this appointment with
the Chair of Corporate Committee
position.      
Councillor Macrae presented the minute of the meeting of Moray Council on 29
June 2022 as a true and accurate record of the meeting.  The minute was
submitted and approved.   
6.         Attendance 
Councillor Cameron sought clarification on whether there were any sanctions
available to the Council to make Councillors attend Committee meetings.  
In response, the Legal Adviser advised that there is a Notice of Motion later on the
agenda which is around member's attendance at meetings, but confirmed that in
respect of attendance, it is accepted that Members have busy lives and often there
can be conflicts due to work, personal lives and other Council business and the
intention is that Members attend when they can but there may be genuine reasons
why in certain circumstances they are unable to attend.  She further added that it
was not appropriate to speculate on reasons and confirmed that when Councillors
are not at a meeting due to other Council business this is minuted.  The
requirement is to attend once every 6 months but given how early in the
administration the Council is, it would be inappropriate to comment any further.  
7.         Notice of Motion - Committee Changes 
Councillor Mustard sought agreement, due to a material change in circumstances,
namely the resignation of Councillor Macrae as Convener and changes in the
membership of the Conservative group that the Council agree in terms of Standing
Order 83 to suspend standing order 5 to allow consideration of this motion.  
Councillor McLennan sought clarification on the understanding of Standing Order 7
and subsequently asked for it to be read out.  
In response the Legal Officer confirmed that Standing Order 7 stated:  
Notwithstanding the provisions of the foregoing Standing Order, the Council may
effect the early removal from office of the Convener providing:  
a) prior notice to that effect is given at one meeting of the Council on the basis
that the matter would be considered at the next meeting of the Council; or    
b)
where no such prior notice is given, not less than two-thirds of Councillors
present and entitled to vote at a meeting agree that the early removal from
office of the Convener be considered at that meeting.  
Councillor McLennan, thanked the Legal Adviser and further added that the Notice
of Motion presented today asked the Council to do more than just change the
Convener and the remuneration allowance associated with that.  He further added
Page 9

Page 10

that what was presented was beyond Standing Order 7 and sought clarification on
whether Standing Order 7 applies to what is being asked today or whether other
Standing Orders apply.  
In response, the Legal Adviser confirmed that Standing Order 7 refers to the
removal by the Council of the Convener.  The Convener has removed himself from
the position by resigning and therefore the previous intimation of Standing Order 7
is now not valid and therefore the motion before the Council is competent as there
is no Convener and now a decision needs to be made in relation to the
governance of the Council.  
Councillor McLennan sought further clarification on Standing Order 7 and that it is
only for the removal of the Convener and that the Notice of Motion is asking the
Council to consider more than that.  
The Legal Adviser, re-iterated her previous advice that the Convener has resigned
and therefore there is no Convener to remove so therefore Standing Order 7 is not
relevant to the consideration of the Notice of Motion.  
The Chief Executive, further added in support of the Legal Adviser's advice in
terms of relevancy, Standing Order 7 enacts in local standing orders what is a
statutory requirement in terms of local government legislation about the removal of
a Convener and it is a matter of fact, as already confirmed by the Legal Adviser,
the Convener has resigned and that is not the situation the Council is being asked
to address today.  With regards to the rest of the Notice of Motion, this is an
internal re-organisation of the Leadership of the Council and its Committees and
again is within the remit of the Council.  Beyond the issue of setting up Committees
and the appointment of a Convener the statutes are silent on how Local Authorities
set up their internal structure in terms of Committees.  
The Chair sought confirmation from the Council, that they were happy to suspend
standing orders to consider the Notice of Motion.  
This was unanimously agreed.  
The Chair proposed a short adjournment to allow Members to consider the further
detailed information in relation to the appointments to the positions in the notice of
motion which was provided at the meeting.  This was unanimously agreed 
On the resumption of the meeting and in terms of Standing Order 34a, there was
submitted a Notice of Motion By Councillor Mustard, seconded by Councillor
Colyer in the following terms:  
Committee Changes  
Following a reappraisal of roles within the Conservative Councillor Group, we invite
the Moray Council to make appointments as listed below:  
A change to the position of Leader* – Political leader, Chair of Moray Council and
attends Cosla - Councillor Robertson  
Create and appoint a Depute Leader - Deputises for Leader - Councillor Gatt  
Amend the position of Convener to Civic Leader – civic/ceremonial role -
Councillor Cowe  
Page 10

Page 11

The allocation of Committee Chairs  
The allocation of Senior responsibility allowances. (Leader, Depute Leader, Civic
Leader +6: total 9 and 2 non-admin)  
To ensure continued good governance, authorise delegation to the Chief Executive
and Monitoring Officer to amend/create job descriptions for Leader, Depute Leader
and Civic Leader and to amend Standing Orders and bring back to a future
meeting of Moray Council for agreement.  
Council notes that there are no proposed changes to Committee sizes.  
In response, Councillor Leadbitter said that the SNP Group were supportive of the
Convener role being a Councillor from outwith the Administration, however was not
supportive of a 3rd paid role at the head of the Council, when so many are
struggling with the ongoing day to day cost of living crisis.  Councillor Leadbitter
proposed, seconded by Councillor Coull that the Council agrees that there should
be a single Leader of the Council along with a Convener with the role definitions
remaining unchanged.    Should the amendment be successful then the Council
subsequently makes the appointments to the 2 roles.  The appointment of Chairs
etc would then be for the Administration Group to agree.  
The Legal Adviser confirmed that the number of Senior Responsibility Allowances
were remaining unchanged at 11 as per the current allocation, so there was no
increase of allowances being paid.  
Councillor Van Der Horn sought to propose that the Council consider reviewing the
appointments to Committee and Committee sizes and to report back by September
as he felt that members need to work effectively and to their best skills and
passions in order to serve the people of Moray.  
Councillor McLennan sought confirmation on whether the Conservative Group
should have declared an interest at the beginning of the meeting in regards to this
item on the agenda.  
In response, the Legal Adviser confirmed that at the point of Declarations on the
agenda, Councillor Robertson had confirmed that the Conservative Group had
discussed and considered all items on the agenda but no whip had been given to
members on how they should vote.  
Councillor McLennan further added that the Council could be setting a dangerous
precedent in terms of governance and scrutiny citing some historical references.  
In response, the Chair advised that Councillor McLennan's comments were not
relevant to the discussion.  The Legal Adviser further asked Councillor McLennan
to consider what he was saying in terms of the Councillor's Code of Conduct.  
The Chair asked Councillor Van Der Horn if he had a seconder for his
amendment.  In response, Councillor McLennan said he would second the
amendment.  He further added that any changes to Committees should be made
alongside the ongoing Governance Review with evidence based approaches.  
The Legal Adviser confirmed that although she was not aware as to the progress
of the Governance Review, she did not think that it would be available to come
Page 11

Page 12

back to Council by September and perhaps there was a divergence between what
Councillor McLennan and Councillor Van Der Horn are seeking to achieve.  
In response, Councillor McLennan confirmed he was happy to accept the
amendment as per Councillor Van Der Horn's proposed wording.  
Following further discussion, the Chair proposed a short adjournment to allow the
Legal Adviser and Clerk to clarify the motion and 2 amendments.  This was
agreed.  
On the resumption of the meeting, the Chair invited the Legal Adviser to clarify the
current position.  
The Legal Adviser sought clarification from Councillor Van Der Horn as his
amendment was only around reviewing Committees and made no indication as to
whether he was supportive of the remainder to the Conservative Notice of Motion
or whether he was supportive of the SNP amendment.  She further added that the
SNP amendment was only to address the Leadership of the Council and was not
considering a review of Committees at this time.  
In response, Councillor Van Der Horn confirmed that he would withdraw his
amendment and consider his position at a later item on the agenda.  
On the division there voted:  
For the Motion (14)
Councillors Mustard, Colyer, Bloomfield, Cowe,
Divers, Dunbar, Gatt, Gordon, Keith, Macrae,
McBain, Robertson, Ross and Williams  
For the Amendment (11)
Councillors Leadbitter, Coull, Allan, Cameron,
Fernandes, Harris, Lawrence, McLennan, Morrison,
Van Der Horn and Warren 
Abstention (0)    
Therefore the motion became the finding of the meeting and the Council agreed:  
i)  a change to the position of Leader – Political leader, Chair of Moray
Council and attends Cosla    
ii)   create and appoint a Depute Leader - Deputises for Leader    
iii)   amend the position of Convener to Civic Leader – civic/ceremonial role    
iv)   the allocation of Committee Chairs     
v)  the allocation of Senior responsibility allowances. (Leader, Depute Leader,
Civic Leader +6: total 9 plus 2 non-admin)     
vi) to ensure continued good governance, authorise delegation to the Chief
Executive and Monitoring Officer to amend/create job descriptions for
Leader, Depute Leader and Civic Leader and to amend Standing Orders
and bring back to a future meeting of Moray Council for agreement.  
Following the conclusion of the vote, Councillor Cowe expressed his sincere thanks
to his fellow Councillors for giving him the privilege and honour to serve the people
of Moray as a Civic Leader.
Page 12

Page 13

8.         Notice of Motion - Council Committees Membership 
In terms of Standing Order 34a, there was submitted a Notice of Motion By
Councillor Fernandes, seconded by Councillor Lawrence in the following terms:  
Council Committees Membership  
Council regrets that councillors’ workload is not shared equitably.   
Council notes that some committees still have vacancies, and that is an example
of bad governance and poor collaborative working.  
Council further notes that the Code of Conduct asserts that Councillors ‘have a
duty to act in the interests of [their] council as a whole and all the communities
served by it and a duty to […] represent their interests conscientiously.’ Council
agrees that this duty includes attendance at committees  
Council notes that should a Committee position remain vacant, it can appoint
members to Committees by name.  
Council asks all Councillors to take up the positions in committees they have been
offered, in accordance with the political balance agreed by this Council. 
In agreeing with the Notice of Motion, Councillor Robertson proposed, given the
recent changes in political balance, to allow Members until the end of August to
agree the vacancies and any places which remain unfilled by that time will be
brought back to the next meeting of Moray Council on 28 September 2022 where
the vacancies will be filled.  
Councillor Van Der Horn re-affirmed his view from the previous item, that a review
of Committee sizes is considered and look at other ways of working
collectively.  Councillor Van Der Horn proposed that the Council reviews the
appointments to Committees and Committee sizes and to report back in October
and in the interim look at how other Councillors from other political parties and
independents fulfil the roles within the Committees.  
In response to Councillor Van Der Horn's amendment, the Legal Adviser clarified
that there is not a meeting of Moray Council in October the next meeting would be
7 December.  She further expressed caution around Councillors taking snap shot
examples of other Councils as there may be other governance arrangements in
place that support their committee structure and sizes.  She further added, that
with regards to new Councillors, there is a lot of work carried out by the Elections
Team prior to the election to prepare prospective Councillors for their new role with
an indication of what is expected.  
The Chief Executive further added that a review of the Council's governance
around Committee structure ,which looked at examples from other Councils, had
already taken place and that there was agreement at the meeting of Moray Council
on 18 May 2022 to continue with the current Committee sizes.  If members wished
Officers to carry out a review of Committee sizes then that would be a manageable
exercise, however to carry out a further review comparing with all 31 Local
Authorities in Scotland, would be a significant piece of work and information for
Members to review.  He further added that if Members looked at national reports or
the Council's own staff surveys the indication is that staff are already at capacity
Page 13

Page 14

and workloads are an issue.  He added that ultimately the issue is for members to
agree however as Chief Executive it was his duty to inform members of the issues.  
Councillor Williams sought clarification from Councillor Fernandes on whether in
the motion, is to appoint members to vacant positions by name or by party.  
In response, Councillor Fernandes confirmed that it was by Councillor and not
party.  
Councillor McLennan confirmed that he was happy to second Councillor Van Der
Horn's amendment.  
The Chair sought confirmation from Councillors Fernandes and Lawrence if they
were happy to accept her statement regarding the timescales for filling the
vacancies.  
Councillor Fernandes confirmed that he was happy to accept the Chair's additional
statement but sought clarification on whether Councillor Van Der Horn's
amendment was competent.
.
In response, the Legal Adviser confirmed that given there had been agreement in
the previous item not to change the Committee sizes there would need to be a
suspension of standing orders to consider Councillor Van Der Horn's amendment.  
In response Councillor Van Der Horn confirmed that he would withdraw his
amendment following the advice from the Legal Adviser.  
Thereafter, Council agreed the notice of motion as stated with the addition, taking
into account the recent changes in political balance, to allow Members until the
end of August to agree the vacancies and any places which remain unfilled by that
time, will be brought back to the next meeting of Moray Council on 28 September
2022 where the vacancies will be filled.   
9.         Notice of Motion - Pride in Moray 
In terms of Standing Order 34a, there was submitted a Notice of Motion By
Councillor Harris, seconded by Councillor Van Der Horn in the following terms:  
Pride Event in Moray  
The Council supports and welcomes Pride in Moray 2022, on the 3 September
2022. This marks the first ever Pride event in our region, marking LGBTQ+
visibility in our area. We continue to support the Council’s commitments and
obligations to a fair and inclusive society and the importance of identifying the
challenges of being LGBTQ+, for those living in rural communities, and especially
younger people. The Council recognises it can do more and will do so in the future
and agrees to work supportively with LGBTQ+ groups going forward.  
Following consideration the Council agreed to support the Notice of Motion as
stated.  
Councillor Mustard left the meeting at the conclusion of this item. 
10.         Notice of Motion - Elgin Bypass
Page 14

Page 15

In terms of Standing Order 34a, there was submitted a Notice of Motion By
Councillor Keith, seconded by Councillor Divers in the following terms:  
Elgin Bypass   
The Moray Council notes that the Scottish National Party committed to
improvements to the A96 in its 2007 Scottish Parliament election manifesto, and
the Scottish Government committed to the full dualling of the A96 in its
Infrastructure Investment Plan of 2011. 
The Moray Council notes that the preferred route option for A96 dualling between
Hardmuir and Fochabers was published by Transport Scotland in 2018, which
includes full bypassing of Elgin. The scheme proposes to complete works for A96
dualling between Hardmuir and Fochabers by 2030. 
The Moray Council further notes that the last published updates for the scheme
were ground investigation works in January 2020. 
The Moray Council believes that bypassing of Elgin is overwhelmingly supported
by residents of Elgin and surrounding areas; that the benefits of a bypass include
reductions in traffic congestion within Elgin; and improvements in air quality, visual
amenity, and road safety – especially for active travel.   
The Moray Council re-affirms its support for an Elgin bypass. 
The Moray Council is concerned about the slow pace of progress on this vital
infrastructure project. 
The Moray Council mandates the Council Leader to write to the Minister for
Transport to remind the Minister of the above stated facts, to re-iterate the
Council’s support for an Elgin bypass, to express the Council’s concerns about the
slow pace of progress in delivering a bypass for Elgin, to demand a firm timetable
for the delivery of an Elgin bypass: in particular, when the Minister expects to lay
the relevant orders before Parliament, and when the Minister expects construction
work to commence. 
The Moray Council requests that any response to the Council Leader from the
Minister for Transport be communicated with members as soon as practicably
possible.  
Councillor Gatt, in fully supporting the Notice of Motion, sought confirmation on
whether the Notice of Motion could include recognising that Keith faces similar
issues to Elgin and to extend the Notice of Motion to include the Keith bypass as
well as the Elgin bypass.  
Councillor Keith confirmed that he was happy to include the additional requests
from Councillor Gatt  
In terms of standing order 83 the Chair sought approval from Council to
suspend standing order 75 to continue the meeting past 12.45pm in order to
conclude the consideration of this item.  This was unanimously agreed.  
Page 15

Page 16

Councillor Leadbitter, proposed amending the Notice of Motion to refer to the
whole dualling of the A96 and not just the Elgin and Keith bypasses and sought
agreement to write to both the Westminster and Scottish Governments.  
Following the proposed changes to the motion suggested by Councillors Gatt and
Leadbitter and accepted by Councillors Keith and Divers, the Council agreed:  
to note that the Scottish National Party committed to improvements to the A96 in
its 2007 Scottish Parliament election manifesto, and the Scottish Government
committed to the full dualling of the A96 in its Infrastructure Investment Plan of
2011.  
that the preferred route option for A96 dualling between Hardmuir and Fochabers
was published by Transport Scotland in 2018, which includes full bypassing of
Elgin. The scheme proposes to complete works for A96 dualling between Hardmuir
and Fochabers by 2030. 
to note that the last published updates for the scheme were ground investigation
works in January 2020.  
that bypassing of Elgin is overwhelmingly supported by residents of Elgin and
surrounding areas; that the benefits of a bypass include reductions in traffic
congestion within Elgin; and improvements in air quality, visual amenity, and road
safety – especially for active travel.  
to re-affirm its support for a Elgin bypass. 
to recognise similar difficulties in Keith due to a lack of bypass, as well as support
for a bypass by residents which would bring similar benefits and re-affirms its
support for a Keith bypass.  
that both Elgin and Keith bypasses should be high quality dual carriageways in
order to futureproof the road for full A96 dualling.  
that the Council is concerned about the slow pace of progress on this vital
infrastructure project.  
to mandate the Council Leader to write to both the Westminster and Scottish
Governments to remind the Ministers of the above stated facts, to re-iterate the
Council’s support for the dualling of the A96, to express the Council’s concerns
about the slow pace of progress in delivering a bypass for Elgin and Keith, to
demand a firm timetable for the delivery of bypasses for Elgin and Keith: in
particular, when the Ministers expect to lay the relevant orders before Parliament,
and when the Ministers expect construction work to commence.  
to requests that any response to the Council Leader from the Minister for Transport
be communicated with members as soon as practicably possible. 
that Moray Council seeks further written support from both local MP and MSP.   
11.         Resumption of Meeting
Page 16

Page 17

PRESENT
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe,
Councillor John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes,
Councillor Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor
Sandy Keith, Councillor Scott Lawrence, Councillor Graham Leadbitter, Councillor
Marc Macrae, Councillor Paul McBain, Councillor Neil McLennan, Councillor
Shona Morrison, Councillor Bridget Mustard, Councillor Kathleen Robertson,
Councillor Derek Ross, Councillor Draeyk Van Der Horn, Councillor Sonya
Warren, Councillor Ben Williams  
APOLOGIES 
Councillor Christopher Price  
IN ATTENDANCE
Also in attendance at the above meeting were the Chief Executive, Depute Chief
Executive (Economy, Environment and Finance), Chief Financial Officer, Legal
Services Manager, Consultancy Manager, Environmental Protection Manager,
Sport and Culture Service Manager, Emma Gordon, Planning Officer and Tracey
Sutherland, Committee Services Officer. 
12.         Notice of Motion - Climate and Ecology 
In terms of Standing Order 34a, there was submitted a Notice of Motion By
Councillor Van Der Horn, seconded by Councillor Cameron in the following terms:  
Moray Council to support the Climate and Ecology Bill
Preamble
Humans have already caused irreversible climate change, the impacts of which
are being felt in the UK and around the world. The global temperature has already
increased by 1.2°C above pre-industrial levels, and the natural world has reached
crisis point, with 28% of plants and animals threatened with extinction.  
Climate change
Unless we drastically change course, the world is set to exceed the Paris
Agreement’s 1.5°C limit. Pledges, such as the Paris Agreement and Glasgow
Pact—and updated emissions targets—are not legally-binding. This gap between
pledges and policy leaves the world on course for catastrophic warming of near
3°C.
Following the  “now or never” Intergovernmental Panel on Climate Change (IPCC)
report in April 2022, the UN Secretary General António Guterres stated that “we
are on a fast track to climate disaster. This is not fiction or exaggeration. It is what
science tells us will result from our current energy policies”.
In addition, the UK Government’s Net Zero Strategy stated that “if we fail to limit
global warming to 1.5°C, we risk reaching climatic tipping points, we could lose
control of our climate for good”. The 1.5°C goal is ‘on life support’ and only
ambitious action from supranational and devolved authorities, civil society, the
private sector and local communities will help us realise it.
Biodiversity loss
The UK is one of the most nature-depleted countries in the world. More than one in
seven of our plants and animals face extinction, and more than 40% are in decline.
We therefore welcome the Leaders' Pledge for Nature, signed by the UK
Government, which states that—if we fail to halt and reverse biodiversity loss by
Page 17

Page 18

2030—we increase the risk of further pandemics, rising global temperatures and
loss of species. In order to achieve this, the UK needs a legally-enforceable nature
target so that, by 2030, nature is visibly and measurably on the path of recovery—
in line with the Global Goal for Nature.
Approval by the Scottish Parliament
The targets and strategy in the Bill provide and rely on conditions being met; that
the Scottish Parliament has passed a motion of the form “That this Parliament
agrees to the climate and nature targets in section 1 of the Climate and Ecology
Act 2022”; that the Scottish Parliament has passed a motion of the form “That this
Parliament agrees to the measures in the Climate and Nature Strategy” 
Moray Council notes that:
There is a Bill that was introduced into the current UK Parliament in May 2022—
the Climate and Ecology Bill—which, if it becomes law, would require the
development of a strategy to ensure that the UK’s environmental response is in
line with the latest science. The strategy would ensure that:
the ecological crisis is tackled shoulder to shoulder with the climate crisis via a
joined-up approach;
the Paris Agreement aim is enshrined into law to ensure that the UK does its full
and fair share to limit the global temperature rise to 1.5°C; 
we halt and reverse biodiversity loss by 2030 to ensure that the UK’s ecosystems
are protected and restored;
the UK takes responsibility for its greenhouse gas footprint, including international
aviation and shipping—and by accounting for consumption emissions related to
the goods and services that are imported and consumed in the UK;
the UK takes responsibility for its ecological footprint in order to better protect the
health and resilience of ecosystems—including along domestic and global supply
chains; and
an independent, temporary Climate and Nature Assembly is set-up—
representative of the UK population—to engage with the UK Parliament and UK
Government to help develop the strategy.  
Moray Council therefore resolves to: 
Support the Climate and Ecology Bill; 
That the next update of Moray’s Climate Change Strategy and Routemap to net
zero shall incorporate consideration of alignment with the Bill’s objectives and
principals. 
Write to Douglas Ross MP, letting them know that the motion has been passed —
urging them to sign up to support the Bill, or thanking them for already doing so;
and 
Write to Zero Hour, the organisers of the cross-party campaign for the Bill,
expressing its support (joinus@ceebill.uk). 
Following consideration the Council agreed:  
Support the Climate and Ecology bill;  
The next update of Moray’s Climate Change Strategy and Routemap to net zero
shall incorporate consideration of alignment with the Bill’s objectives and
principles.
Page 18

Page 19

The Leader of the Council will write to Douglas Ross MP letting him know that the
motion was passed and urging him to sign up to support the Bill, or thank him for
already doing so; and  
Write to Zero Hour, the organisers of the cross-party campaign for the Bill,
expressing the Council’s support. 
13.         Written Questions ** 
The Council noted that no written questions had been submitted.    
14.         Constitution of Appointments Committee for Post of Head of Service
and Chief Social Work Officer 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) invited the Council to agree the establishment of an
Appointments Committee for the appointment of the post of Head of Service with
Moray Integration Joint Board (MIJB).  
Following consideration the Council agreed:  
i) the proposed appointments committee as set out in Section 4 of the report,
including the membership of the appointments committee; and    
ii) that the Council's appointed Chair/Vice Chair of the IJB is Chair of the
appointments Committee. 
15.         Period Products Moray Council Statement on Exercise of Functions 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the Council of progress in meeting the
Period Products (Free Provision) (Scotland) Act 2021 and sought agreement for a
statement of intent outlining how the Council will meet the requirements of the Act.  
The Chief Executive confirmed that there would be a comprehensive media
campaign in terms of raising awareness of the availability of the service and also
the issues around stigma.  
He further advised that there is a suite of posters, social media graphs and window
stickers developed and ready to be published/distributed once the statement is
approved.  There will be a press release in the first instance and a webpage is
being developed on the Council's website to host all the information.  This will
include links to venues that will hold free products as well as the PickUpMyPeriod
App.  
He further added that the guidance sits behind the publicity materials that will be
distributed and Education colleagues have been involved with developing the
campaign to ensure it meets the needs of both primary and secondary
pupils.  Furthermore, it is acknowledged that the Council need to encourage
anyone who needs these free products to feel comfortable taking them, this
includes men who may be collecting on behalf of a dependent.  The campaign is
designed to reduce stigma for all who need these products.
Page 19

Page 20

Following consideration the Council agreed to approve and adopt the Statement of
Intent at Appendix 1 for the Exercise of Functions Period Products (Free Provision)
(Scotland) Act 2021.  
16.         Short to Medium Term Financial Plan 
A report by the Depute Chief Executive (Economy, Environment and Finance)
asked the Council to consider an update to the Council's Financial Plan for 2022 -
2025 and agree a hierarchical approach to the financial planning process for
2023/24 and 2024/25.  
Following consideration the Council agreed to:  
i) note the updated budget for 2022/23 and forecast positions for 2023/24 and
2024/25;    
ii) notes the likely implications of the Scottish Government Spending Review;    
iii) notes the current position regarding inflation;    
iv) notes that there are still significant uncertainties relating to the Council's
budgetary position for 2022/23 and future years; and    
v) approve the approach to financial planning for 2023/24 and 2024/25 set out
in paragraphs 5.7 and 5.8.   
17.         Common Good Funds Summary Expenditure Disposable Income 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Council of the final position of Common Good Funds at 31 March
2022 and the estimated income available for disbursement in 2022/23.  
Following consideration the Council agreed:  
i) to note the disbursements approved for 2021/22 for each of the Common
Good Funds shown in Appendix 1;    
ii) to approve the carry forward of the undisbursed balances for 2021/22 for the
Buckie, Cullen, Dufftown, Elgin, Forres, Portknockie, Keith and Findochty
Funds to be made available for 2022/23;    
iii) the estimated income available for disbursement in 2022/23 shown in
Appendix 1;    
iv) to note the Balance Sheet for each Common Good in Appendix 2; and     
v) to note Common Good Fund asset register in Appendix 3.  
18.         Trust Funds Summary Expenditure Disposable Income 
Page 20

Page 21

A report by the Depute Chief Executive (Economy, Environment and Finance)
informed Members of the disbursements made from Trusts in 2021/22 and the
estimated disposable income available for disbursement in 2022/23.  
Following consideration the Council agreed:  
i) to note the disbursements made from each of the Trust Funds in 2021/22,
shown in Appendix 1; and    
ii) the estimated income available for disbursement in 2022/23, shown in
Appendix 2. 
19.         Covid Economic Recovery Fund 
A report by the Depute Chief Executive (Education, Communities and
Organisational Development) informed the council of how the Covid Economic
Recover Fund has been utilised and to seek approval for the proposed allocations
from the remaining funds.  
Following consideration the Council agreed:  
i) to note the progress on the dispersion of the Covid Economic Recovery
Fund;    
ii) agree to re-allocate some of the funding between the Flexible Food Fund
(£162,000) and a Sport and Culture Hardship Fund (£40,000); and    
iii) to transfer any unspent balance as at 31 March 2023 into an earmarked
reserve.   
20.         Place Based Investment Programme 
A report by the Depute Chief Executive (Economy, Environment and Finance)
informed the Council on the Place Based Investment Programme and
recommended spend for 2022/23.  
Following consideration, the Council agreed to:  
i) approve spend of this year's allocation for the Place Based Investment
Programme for construction of Pinefield Allotments in Elgin, town centre
improvements and procurement of land or works associated with Buckie
Harbour development; and    
ii) delegate authority to the Head of Economic Growth and Development in
liaison with the Chief Financial Officer to vire money between the identified
projects to ensure that they can be delivered and minimise risk of
underspend.   
21.         Edinburgh Declaration 
Page 21

Page 22

Under reference to paragraph 9 of the minute of Economic Development and
Infrastructure Services on 8 February 2022, a report by the Depute Chief
Executive (Economy, Environment and Finance) asked the Council to sign the
Edinburgh Declaration and note potential future actions to assist in halting
biodiversity decline.  
Following consideration the Council agreed to:  
i) sign the Edinburgh Declaration;    
ii) note the potential future local actions to help address biodiversity decline
within section 4.3 of this report; and    
iii) note reports on the draft National Planning Framework (NPF) 4 consultation
and Local Development Plan guidance were reported to the Planning and
Regulatory Services Committee on 1 March 2022.  Thee reports set ou the
national policy and evidence gathering requirements to address the nature
crisis.    
22.         Question Time *** 
Under reference to paragraph 14 of the minute of the meeting of Moray Council on
29 June 2022, Councillor Warren sought confirmation on when a report will be
brought to Economic Development and Infrastructure Services Committee on the
20mph zones.  
In response the Depute Chief Executive (Economy, Environment and Finance)
confirmed a report will be presented to the 6 September 2022 meeting.  
Under reference to paragraphs 13 and 15 of the minute of the meeting of Moray
Council on 29 June 2022, Councillor Morrison sought an update on the creation of
the Cost of Living Working Group.  
In response, the Chief Executive admitted that the creation of the group had not as
yet progressed, however CMT were meeting later in the week and moving this
forward was on the agenda.  He assured Councillor Morrison that there is no
complacency within the Council and work is already being carried out within the
various services of the Council.  
Under reference to paragraph 22 of the minute of the meeting of Moray Council on
29 June 2022, Councillor Cowe sought clarification on the reduction in the Roads
Budget by £19.3m as he felt this was a huge decrease in one year.  
In response, the Chief Financial Officer confirmed that this figure was cumulative
over a 10 year period.  
Under reference to paragraph 37 of the minute of the meeting of Moray Council on
29 June 2022, Councillor McLennan sought clarification on whether the
appointment to the Scottish War Memorial Outside Body was a Cosla appointment.  
In response, the Clerk confirmed that the appointment was a Council appointment
which was subsequently notified to Cosla.  
Page 22

Page 23

Under reference to paragraph 37 of the minute of the meeting of Moray Council on
29 June 2022 Councillor Ross, sought further clarification on the Outside Body
Appointment to Knockando Woollen Mill as the organisation had asked specifically
for a representative from the Council to continue sitting on the Board.  
In response, the Head of Economic Growth and Development confirmed that it was
up to Members to decide whether they wished to appoint a representative however
added that an appointment was made when the Woollen Mill was
receiving significant external funding through the Council but felt that there was no
longer a need for the Council to appoint a representative in regards to the
Council’s involvement with the Mill.  
The Chair then sought views from the Council, on whether it thought a
representative was needed.  
In response, Members confirmed that they wished to continue the representation
and to appoint Councillor Ross.  
Councillor Cowe sought confirmation on whether the Council could apply for grants
to help tidy up the streets in Moray.  
In response, the Environmental Protection Manager confirmed that this is
something the Council are currently looking into and will respond to Councillors
with further information in due course.  
Councillor Warren raised concerns about the rising number of holiday/second
homes in Findochty and other seaside towns in the area and sought clarification on
what the Council are doing to prevent these towns and villages turning into ghost
towns/villages.  
In response, the Head of Economic Growth and Development confirmed that a
new Housing Needs, Demand and Assessment is currently being produced and it
is hoped when it is complete early next year, it will provide an evidence based
assessment on whether second home control zones are required and how they
can be implemented which would limit the number of second Home/Airbnb style
properties within certain areas.  
Councillor Coull asked whether the Council Leader could write to all those Moray
residents who had participated in the recent Commonwealth Games in
Birmingham to congratulate them on representing Scotland and Moray.  
In response, the Council Leader said she would be happy to do this.  
Councillor Gordon sought an update, following enquiries from constituents, on
when the Council Access Points will be re-opening to members of the public on a
full time basis.  
In response, the Chief Executive, confirmed that the Council is currently
implementing a decision from the previous Council around how Access Points and
hubs will operate going forward.  He further added that a briefing paper on the
progress to date could be circulated to Members following the meeting.  
Councillor Dunbar sought clarification on how often Moray by-laws are reviewed.  
Page 23

Page 24

In response the Legal Services Manager confirmed that Moray have a very limited
amount of by-laws and was unsure if there is a set timescale for the review of
them.  She further sought clarification on whether Councillor Dunbar had a specific
by-law in mind.  
In response, Councillor Dunbar confirmed it was specifically the by-law around
what young people can do in terms of employment.  
In response, the Legal Services Manager confirmed that she would check the
current by-law to determine if there is a review date and would come back to
Councillor Dunbar following the meeting.  
Councillor Van Der Horn sought clarification on whether the Council had any plans
to provide Warm Zones, particularly during the Winter and in light of the increasing
cost of fuel.  
In response, the Chief Executive confirmed that there were no current plans and
the issue would be considered as part of the Council’s wider plans in respect of
resilience around Winter planning.  
Further consultation would be required with colleagues in due course.  
Councillor Warren raised concerns around the shortages of childminders in the
Buckie area and what the Council are doing to address the shortage.  
In response, the Legal Services Manager, in the absence of any officers from
Education, agreed to provide Councillor Warren with an update following the
meeting.  
The Chief Executive further added that he had met with Highlands and Islands
Enterprise and other partner agencies to look at the wider issue and to try and find
solutions to the issues.  Models currently being used in Highland are being
considered to determine whether they could help ease the pressures being faced
in Moray. 
23.         Recycling Improvement Fund - Application for Funding [Para 8 & 9] 
A report by the Depute Chief Executive (Economy, Environment and Finance)
asked the Council to approve the submission of an application for funding through
the Scottish Government's £70million Recycling Improvement Fund (RIF) and the
acquisition of land for project development.  
Following consideration the Council agreed:  
i) the submission of an application to Zero Waste Scotland (ZWS) for funding
through the Scottish Governments £70million RIF for the development of a
new Household Waste Recycling Centre for Elgin; and    
ii) to delegate authority to the Head of Housing and Property and Legal
Services Manager to purchase land suitable for the HWRC on terms suitable
to the Council subject to a successful grant application and on obtaining
planning consent.     
Page 24

Page 25

Page 25

Page 26

Page 26

Page 27

MORAY COUNCIL 
Minute of Special Meeting of the Moray Council 
Wednesday, 14 September 2022 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe, Councillor
John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith,
Councillor Scott Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Neil McLennan, Councillor Shona Morrison,
Councillor Bridget Mustard, Councillor Kathleen Robertson, Councillor Sonya
Warren, Councillor Ben Williams 
APOLOGIES 
Councillor Derek Ross, Councillor Draeyk Van Der Horn 
IN ATTENDANCE 
Also in attendance at the meeting were the Chief Executive, Depute Chief Executive
(Education, Communities and Organisational Development), Head of Governance,
Strategy and Performance and Tracey Sutherland, Committee Services Officer. 
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson as Council Leader.  
2.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Order 20 and the Councillors’ Code of Conduct, there were no
declarations from Group Leaders or Spokespersons in regard to any prior decisions
taken on how Members will vote on any item on the agenda or any declarations of
Member’s interests in respect of any item on the agenda. 
3.         Two Minute Silence 
The Council Leader asked those in attendance in the Chamber and online to join her
in a 2 minute silence to pause and reflect.  
4.         Motion of Condolence - Her Majesty The Queen 
In terms of Standing Order 34a, there was submitted a Notice of Motion By Councillor
Robertson, seconded by Councillors Leadbitter, Morrison, Divers, McLennan and
Allan in following terms was unanimously agreed:
Item 4b.
Page 27

Page 28

That the Council expresses its deepest regret and grief at the death of Her Majesty
The Queen; conveys its sincere condolences to His Majesty The King and other
members of the Royal Family in their bereavement; affirms the great affection and
esteem in which Her Majesty was held, and expresses gratitude for her life of
exceptional public service and her long and close association with Moray and the
people of Moray, and asks the Civic Leader to write to His Majesty King Charles III
with the Council's condolences.  
Councillor Williams joined the meeting at this juncture. 
5.         Tribute from Scottish Conservative and Unionist Group Leader -
Councillor Kathleen Robertson 
Her Majesty Queen Elizabeth II has been the paragon of public service ever since her
commitment to the British People at the age of 21. She has been unwavering in her
dedication to the United Kingdom and the Commonwealth. Her life has been an
example to all of us in this chamber who have committed to public service by serving
the People of Moray with Duty, Integrity, Selflessness, Objectivity, Accountability and
Stewardship, Openness, Honesty, Leadership and Respect.  
She has been a steadfast influence in all of our lives and has guided us through so
many challenging times. She has supported and led our nation through conflicts and
crises, natural disasters and a pandemic. 
Her Majesty has had close links to Moray and visited officially on four occasions
1957, 1961, 1964 and most recently 2014. In 1957 she became the first reigning
Monarch to set foot in Lossiemouth and visited again in 1957 disembarking from the
Royal Barge. 
In 1961 she arrived on the Royal Yacht Britannia at Macduff Harbour and then
conducted a whistle-stop tour taking in Cullen, Portknockie, Findochty, Buckie,
Fochabers, Elgin, Kinloss and Forres. It was during this trip that she planted the trees
outside our Council Offices here in Elgin and commented on the natural beauty of
Grant Park, Forres which now hosts the Unicorn carving placed on her Platinum
Jubilee. 
Another visit in July 1967 came on Prince Charles' very last day as a pupil at
Gordonstoun, where he had boarded for the previous five years.  The Queen officially
opened the school's new sports centre. 
The following morning, accompanied by her son, the Queen attended a Sunday
service at St Giles Church in Elgin. How fitting that one of the Moray Condolence
books is sited here and that the Thanksgiving Service will be held there on the 23rd
September.   
Most recently Her Majesty The Queen visited Moray accompanied by His Royal
Highness The Duke of Edinburgh arriving in Elgin on the Royal train in 2014 and
visited RAF Lossiemouth and Kinloss Barracks on the occasion of their 67th Wedding
Anniversary. 
Of course, I’m sure she visited Moray on many more occasions as her children and
some grandchildren were educated at Gordonstoun as was her beloved husband, the
late Duke of Edinburgh. 
Page 28

Page 29

The sense of loss of this remarkable monarch has probably not sunk in for many. She
is represented in so many facets of our life from her image on our coins, notes and
stamps to the Royal Warrant on some of our every day provisions like jams,
marmalades, biscuits and breakfast cereals. Of particular note is the Queen’s warrant
awarded to Moray firm Walkers Shortbread.  
This loss of course we experience as our Queen but we shouldn’t forget that she was
a mother, grandmother and great-grandmother to our Royal Family. Many of us have
lost loved ones and know grief. We however have time to come to terms with it
privately. We must recognise the burden of grief on our Royal Family and having to
play this out so publicly takes enormous strength. 
King Charles III acceded the monarchy in Scotland. We know how much Scotland
means to the King and his Queen Consort who have residences at Birkhall, Castle of
Mey, and Dumfries House. We thank him for his service to Scotland and the passing
of the Scottish Titles he held, to his son Prince William, Prince of Wales. 
On behalf of the Moray Scottish Conservative and Unionist Party we offer our
condolences to the King and his entire family.   
God Save The King! 
6.         Tribute from Scottish National Party Group Co-Leader - Councillor
Graham Leadbitter 
As we have seen from the public response to the sad news of the death of Queen
Elizabeth, it is very obvious that the loss of such an enduring Head of State has
struck a chord with people the length and breadth of Scotland, the UK and much
further beyond. 
Here in Moray the loss will be keenly felt. 
It would be hard to put a firm figure on the number of people in our region who have
had direct experience of meeting with the late Queen Elizabeth but between her
public visits to Moray, her personal connections in the area, the military links, the very
strong connection with Gordonstoun where both her late husband, Prince Philip, and
her eldest son, now King Charles, both studied, it is likely to number in the
thousands. 
People from Moray of many walks of life have attended summer garden parties in
Balmoral;  Moray police officers over the years have spent time on Deeside Royal
Protection duties and I know from friends who have carried out that role that it wasn’t
unusual for them to meet Queen Elizabeth on their patrols and exchange a few
pleasantries, where she was friendly and appreciative of their work. 
Many others have had their professional and charitable work recognised with
numerous civic and military honours. Numerous businesses and charities have also
been honoured.  
In essence, through a life of public service, Queen Elizabeth touched the lives of
people in Moray and in every other region and countries around the world `in different
ways, but all of them memorable and that affection that has developed over her 7
decades as Head of State, the sorrow of her loss and the celebration of her life has
and continues to be demonstrated by people in many different ways. 
Page 29

Page 30

She will be sorely missed by people in Moray but that is incomparable with loss to
those closest to her and our thoughts are very much with her family and close friends
at this time. 
7.         Tribute from Scottish Labour Group Leader - Councillor John Divers 
Thank you, Council Leader. I am sure that we in the Labour Group fully associate
ourselves with everything that has been said so far. In reflecting upon the legacy of
Her late Majesty the Queen I would like to focus on two aspects of her life that are so
significant to us here in Moray.
Much has been written in recent days about Her late Majesty’s affection for the North
East of Scotland. Like many members of this Council, including myself, and
thousands of other Moray residents, the late Queen was not born of the North of
Scotland. Instead, like so many of us, she came to this area as a visitor, me myself
came to this area through the armed forces, and in many ways made it her true
home. The way in which our neighbours in Aberdeenshire took Her late Majesty into
their hearts as one of their own will reflect the experience of many of us who chose to
make the North East of Scotland our own homes, and that bond of friendship reflects
both the warmth of the late Queen as well as the affection of the people of the North
East.
Much has been said about the late Queen’s dedication to the armed services, which
is, of course, a central part of our community here in Moray. My own, sole encounter
with Her late Majesty came during my time in the Royal Navy, serving aboard the
HMS Eagle in 1969. I was a member of the Queen’s Colour Guard.
My No. 1 dress uniform had never been so pristine: my shoes were never so
polished: my blue collar never quite so pressed. But when Her late Majesty looked
you up and down the sense of terror felt by every young sailor immediately melted
away upon sight of that infectious smile we have heard so much about. It is easy to
see why Her late Majesty was so beloved by our forces communities. 
As we mourn the passing of the late Queen we also acknowledge the accession of a
new King. His Majesty has been serving the country for 70 years as Duke of
Rothesay and Prince of Wales. Some of us in this chamber are old enough to
remember when many of the causes championed by His Majesty were seen as being
somewhat eccentric. Fringe issues, like biodiversity, sustainable food supplies, and
climate change.
His Majesty acknowledged in his address to the nation that he cannot champion
these causes the way that he once did. He doesn’t need to, as they are now at the
top of the political agenda, and we in the Labour Group would like to acknowledge the
role that His Majesty has played in bringing these issues to the fore.
Council Leader, to conclude, I propose that the best way that we can honour the
legacy of the late Queen is to all embrace the spirit of service which she embodied.
May she rest in peace, and God save the King.
8.         Tribute from Councillor Neil McLennan - Independent
It is difficult to sum up a tribute to Her Majesty the Queen in the short space we have
here.  I did wonder whether to say anything at all- there are many sharing their
thoughts.
Page 30

Page 31

However, it would be wrong not to say a few words as a mark of respect to a very,
very much so respected women. The Gettysburg Address achieved much in its 270
odd words.  Her Majesty the Queen is deserving of many more words and many
tributes this week and beyond.  All the short speeches, notes on card and social
media comments add to the high regard she was and is held in.
Her Majesty Queen Elizabeth the Great was a woman in the most senior leadership
role in the world.  In the modern world leadership is often criticised, condemned and
critiqued.  However, she led with one word- class. Her grace, her wisdom and her
decorum are an example to us all.  
I remember an old Headteacher friend of mine saying once “always make staffing
appointments on class”.  She did not mean class as in that element of British society
which still exists, but she meant class by decorum and respect-  timeless qualitys for
a’ folk.
Her Majesty was, of course, was of course not elected.  However, she was chosen by
her people by her consistent actions over a long period of time- this is shown by the
showing support for her this week.  Her Majesty the Queen never put a foot wrong in
the modern world of media optics and a post-truth world. Every word was well thought
out and well placed, Royal Communications under her lead were direct and with
decorum, she spoke honestly in an emerging world of false narratives, and her
actions were not negatively scrutinised by the watching lens of the world’s
media.  She led with class and decorum.
It seems she treated all she met with gratitude, respect and genuine interest.  She
was keen to know about matters, global to local, including being aware of their
complexities and challenges.  She steadied her institution during a time of challenge
and question.  All good Captains can do that in rough seas whilst also not being
complacent in gentle waters.
She was class and composure in every way, even when under pressure.  We will
perhaps never see her like again.  What she leaves for us is an example. An example
of leadership, but also an example of humanity.  Whether it be having tea and
sandwiches with Paddington Bear, greeting Presidents and the public to Buckingham
Palace or planting a tree in front of this very building- she is remembered fondly and
with respect.
A personal note of thanks to her and the late Duke of Edinburgh.  Following late
leadership discussions of foreign diplomats, military leaders and civil service and
public leaders, hospitality at Windsor Castle’s St George’s House continued late into
the evening.  A welcome additional hospitality after a long day and this small thing
ensured that full, frank Chatham House discussions continued into the night.  It is the
small things that count as well as the grand gestures and well publicised events.
It has been a remarkable week. A remarkable week following a remarkable 70 years
of service and duty.
Our condolences to King Charles III and the Royal family. 
Your Majesty the Queen, thank you for the example you set, the service you have
given and the duty which you took up not as a trite word but a commitment and a set
of actions that will always be remembered for what you have done.  Rest in Peace
M’am.  Rest in Peace Elizabeth the Great.  
9.         Tribute from Councillor James Allan - Non-Aligned Conservative 
Page 31

Page 32

As Captain of 4th Lossiemouth Company, President of Brigade in Moray and President
for North Scottish Area, I would like to pay tribute to her Majesty the Queen. 
For the duration of her reign, the Boys’ Brigade was proud to have Queen Elizabeth II
as its Patron. 
Following in the footsteps of her father (King George VI) and grandfather (King George
V) the Queen took a keen interest in the work and service to the nation undertaken by
members of the Brigade. 
In 1952 it was announced that the new Queen had “graciously consented to become
Patron of The Boys’ Brigade”. In doing so, Queen Elizabeth II became the fourth
reigning monarch to become Patron. Her Majesty also consented to the renaming of
the highest award in the Brigade from the “King’s Badge” to the “Queen’s Badge”.
Throughout her reign, thousands of Seniors worked hard to earn this award, with a
small handful having the privilege of being presented with it by the Queen in person.
In Her Majesty Queen Elizabeth II we have had a Patron who has been dedicated to a
life of service, a lady of strong faith, someone who has worked tirelessly for our country
and the commonwealth and who is the perfect role model for children and young people
within The Boys’ Brigade. May she now rest in peace and rise in glory. 
On behalf of The Boys’ Brigade we extend our condolences to King Charles lll and the
extended Royal Family, we pray that they be comforted at this difficult time.
God’s Blessings to all. 
God Save the King! 
10.         Invite the Civic Leader to Respond - Councillor John Cowe 
Her Majesty Queen Elizabeth II was more than a monarch - she defined an era.  
In a world of constant changes, she was the constant presence and a source of
comfort and pride to generations, for generations.  
She was a Monarch to whom we could feel a personal and immediate connection,
whether in person, watching her Christmas addresses to the nation or partaking in
her Platinum Jubilee celebrations.  
As a young Princess, she dedicated her life, whether it be long or short to the service
of the British people and those of the Commonwealth.  
With the support of her beloved Duke of Edinburgh she let with dignity, grace and an
unwavering commitment to duty.  
She endured the dangers of a world war with the British people and rallied them
through a world pandemic to look to better days ahead.  
Queen Elizabeth was a stateswoman of unparalleled dignity in an every changing
world and the sorrow we feel now reminds us of her words "Grief is the price we pay
for love."  
Her Majesty was no stranger to Moray, her husband went to school just down the
road as did all her family.  They have an affection for Moray just as they have for the
mountains of Deeside.  She and her family spent her happiest days here amongst the
heather and it is fitting that she died in the place she loved so dearly.
Page 32

Page 33

We send out deepest sympathy to the royal family who are not just mourning their
Queen, but a dearly loved mother, grandmother and great grandmother.  
Her legacy will reign in British history and we shall miss her endearing smile and
steady hand.  
I pledge to write to King Charles III on behalf of the people of Moray to convey the
sincere condolences of us all to him and all the family and wish them comfort in the
days and months ahead with their memories of a life well spent.  
Well done thy good and faithful servant, enter thou into the joys of the Lord.  
God Save the King!   
Page 33

Page 34

Page 34

Page 35

Notice of Motion 
Sky Lantern and Mass Balloon Releases 
Council recognises that the release of sky lanterns and mass balloon releases have
been linked to significant environmental impacts, including fires, pollution and on
occasion has resulted in illness and death to both livestock and wild animals.
Council therefore agrees that the release of sky Lanterns and mass balloon releases
will not be permitted from any event taking place on Moray Council owned or
managed land, where this event has been approved through the Council’s booking
systems.
Proposer      Councillor Leadbitter                                         
Seconder  Councillor Cameron 
Item 5.
Page 35

Page 36

Page 36

Page 37

Notice of Motion 
Warm Banks for Moray 
Preamble 
Many this winter are expected to choose between eating or heating, and there are real
fears that people will freeze at home as bills are unaffordable for many.
The recent energy price guarantee price places a limit of £2,500 on household energy
bills, this figure is still more than double the level of bills for households last winter. People
fear they will not be able to turn on their heating.
It has been estimated that the number of UK households in fuel poverty could more than
double to 12 million in January. The End Fuel Poverty Coalition said 42% of households
would not be able to afford to adequately heat and power their homes from January, even
with the energy price guarantee. 
Meanwhile, with inflation climbing hitting costs of food and fuel and recession looming
there are significant strains on struggling households. 
1. The council notes that heat banks are a response to the crisis to ensure those 
unable to heat their homes can keep warm and safe elsewhere. 
2. The council therefore requests a report with further background to: 
i)  Help identify public buildings in the area which could be used as warm 
spaces for public access during the winter. This could include libraries and  
community centres. 
ii)  Explore how the Council could work alongside partner organisations to look  
at the possibility of making use of their spaces, as well as encouraging 
organisations in the private and third sectors to do the same. 
Proposer: Councillor Van Der Horn
Seconder: Councillor Lawrence 
Item 6.
Page 37

Page 38

Page 38

Page 39

REPORT TO: MORAY COUNCIL ON 28 SEPTEMBER 2022 
SUBJECT: APPOINTMENTS TO COMMITTEES 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To invite the Council to note the remaining Committee membership vacancies
and consider appointments to those committees where vacancies remain. 
1.2 This report is submitted to Council in terms of Sections I, II and III of the
Council's Scheme of Administration relating to the establishment of a
Committee structure, the appointment to Committees, the appointment of
Chair and Depute Chair thereof and the delegation of functions to
Committees. 
2. RECOMMENDATION 
2.1 It is recommended that the Council considers and agrees to:- 
(i) note the current vacancies on the Committees as detailed in
Appendix 1 of the report; 
(ii) determine the appointment to the Education, Children’s and Leisure 
Services Committee relating to the allocation to the Independent
members where 2 nominations have been received; and 
(iii) defer any further consideration of all of the remaining vacancies
until the meeting of Moray Council on 7 December 2022 following
the outcome of the Buckie Ward 3 by-election due to be held on 3
November 2022. 
3. BACKGROUND 
3.1 At the meeting of Moray Council held on 10 August 2022, the Council agreed
that due to the changes in political balance to allow Members until the end of
August to agree vacancies and that any places that remain unfilled by that
time would be brought back to this meeting where the vacancies will be filled
(paragraph 8 of the Minute refers). 
Item 8.
Page 39

Page 40

3.2 Committee Services has been notified of appointments to some but not all of
the vacancies.  The table at Appendix 1 lists the remaining vacancies that
require to be considered.  In regards to the Education, Children’s and Leisure
Services Committee, the allocation of 1 seat to the Independent Members has
not been agreed with 2 nominations coming forward.  It is therefore for the
Council to determine the appointment to this vacancy. 
3.3 Following the meeting on the 10 August 2022, Councillor Price submitted his
resignation as a member of the Buckie Ward 3 resulting in the calling of the
upcoming by-election on the 3 November 2022. His resignation has further
impacted on the Committee vacancies. 
3.4 It has been the practice in the past that any vacancies arising from a
resignation remain unfilled until following the outcome of any by-election. 
4. SUMMARY OF IMPLICATIONS 
(a) Moray 2026: A Plan for the Future and Moray Corporate Plan 
2015 - 2017
None arising from this report. 
(b) Policy and Legal
The proposals set out in this report comply with Sections (I) (II) & (III) of
the Council’s Scheme of Administration relating to the delegation of
functions to Committees and Sub-Committees, the appointments of
Members to these and the appointment of Chair & Deputy Chairs. 
(c) Financial implications
None arising from this report. 
(d) Risk Implications
None arising from this report. 
(e) Staffing Implications
The administration of appointments to Committees and Sub-Committees
can be met within existing resources. 
(f) Property
None arising from this report. 
(g) Equalities
None arising from this report. 
(h) Climate Change and Biodiversity
None arising from this report 
(i) Consultations
Head of Governance, Strategy and Performance has been consulted
and any comments incorporated into the report. 
Page 40

Page 41

5. CONCLUSION 
5.1 Council is invited to note the remaining Committee membership
vacancies; determine the appointment from within the Independent
Members to the Education, Children’s and Leisure Services Committee
and consider deferring the filling of the remaining vacancies to the
meeting of Moray Council on 7 December 2022 following the Buckie
Ward 3 by-election to be held on 3 November 2022. 
Author of Report: Democratic Services Manager
Background Papers: 
Ref: 
Page 41

Page 42

Page 42

Page 43

APPENDIX 1 
REMAINING COMMITTEE VACANCIES 
COMMITTEE REMAINING
VACANCIES
COMMENTS
Audit and Scrutiny 1 1 x allocated to Green/Lib Dem/Non-
Aligned Conservative – left vacant
resulting from resignation of Cllr Price 
Housing and
Community Safety
1 1 x allocated to Independent Cllrs 
Corporate 2 1 x allocated to Independent Cllrs  
1 x allocated to Green/Lib Dem/Non-
Aligned Conservative – left vacant
resulting from resignation of Cllr Price 
Education, Children’s
and Leisure Services
1 1 x allocated to Independent Cllrs,
however 2 nominations received – will
require Council decision
Economic
Development and
Infrastructure Services 
1 1 x allocated to Independent Cllrs
Licensing Committee 2 2 x allocated to Independent Cllrs 
Police and Fire and
Rescue Services 
1 1 x allocated to Independent Cllrs
Appeals 2 1 x allocated to Independent Cllrs 
1 x allocated to Green/Lib Dem/Non-
Aligned Conservative – left vacant
resulting from resignation of Cllr Price 
Moray Local Review
Body
1 1 x allocated to Green/Lib Dem/Non-
Aligned Conservative – left vacant
resulting from resignation of Cllr Price 
Joint Consultative
Committee
1 1 x allocated to Independent Cllrs 
Item 8.
Page 43

Page 44

Page 44

Page 45

REPORT TO: MORAY COUNCIL ON 28 SEPTEMBER 2022 
SUBJECT: CORPORATE PLAN – PROGRESS UPDATE 2021-22 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To invite the Council to review progress made during 2021-22 on the 2019-24
Corporate Plan. 
1.2 This report is submitted to Council in terms of Section III (B) (47) of the
Council's Scheme of Administration relating to review Council wide strategy,
priorities and objectives. 
2. RECOMMENDATION 
2.1 It is recommended that the Council considers and notes the progress
made during 2021-22 on the Corporate Plan 2019-24 as set out in
Appendix 1. 
3. BACKGROUND 
3.1 The Corporate Plan is an important document that is intended to provide
clarity and direction on the Council’s priorities, values and plans for the future. 
Its publication assists in communicating these to the public, the workforce and
partners. 
3.2 The plan provides the context for implementation, the constraints within which
the Council must operate, the challenges and pressures and the
organisational change required to successfully deliver the priorities.  It
provides a link between the national priorities, the Moray Community Planning
Partnership’s plans and the Council’s own plans and priorities so that these
can be cascaded into actions and delivery within service plans. 
3.3 While the Corporate Plan provides focus, it is not intended to encompass
each and every Council service that contributes directly or indirectly to the
priorities or indeed those aspects of services which are less of a priority. 
Item 9.
Page 45

Page 46

3.4 The Corporate Plan 2019-2024 and Delivery Framework were approved by
the Council on 3 March 2020 (para 6 of the Minute refers).  The Plan sets out
Council’s priorities and vision over the 5 year period and how the Council
plans to progress these priorities, including the financial strategy aimed at
progressing towards financial sustainability.   
• Our People: Provide opportunities for people to be the best they can be
throughout their lives with a strong and sustained focus on those
individuals and groups in our society who experience the most
disadvantage and discrimination
• Our Place: Empower and support communities to build capacity
• Our Future: Drive economic development to create a vibrant economy
for the future
• Sustainable: Work towards a financially stable council that provides
valued services to our communities 
The Delivery Framework sets out more detailed actions which will be taken to
achieve these priorities. 
3.5 These actions are incorporated within Service Plans and progress on
monitoring them is reported through service committees, as described in the
Council’s Performance Management Framework.   
3.6 This report brings together reporting on all Corporate Plan actions during the
reporting period across three levels; 
• A high level overview of progress against actions and key performance
indicators (para 3.8 below) with supporting narrative in (para 3.9
below). 
• A more detailed analysis in Appendix 1.  This identifies key
performance indicators for each Corporate Plan action with a RAG
table and donut chart giving a snapshot of progress of underlying
actions and performance indicators.
• Hyperlinks to backing tables which provide the line by line detail for all 
- Actions - what we said we were going to do
- Performance Indicators - the evidence of change 
3.7 The reporting period for this report is from April 2021 and covers a time when
focus has moved constantly between Covid response, maintaining normal
service as far as possible and recovery activity.  The impact of this has been
reported to the Council, most recently in the Strategic Framework for
Recovery and Renewal in Moray – Update on Progress report to the Moray
Council Committee on 15 September 2021 (para 26 of the Minute refers). 
Consideration of lessons learned will form part of the preparation for the
review of the current Corporate Plan to enable due regard to the national
Covid Recovery Strategy and actions.   Corporate Plan actions included in the
Recovery and Renewal Action Plan are well progressed with all above 70%
complete. 
Page 46

Page 47

3.8 High Level Overview of Actions and Performance Indicators: The
following charts and tables provide a streamlined set of data that reflects
performance against strategic priorities in the Corporate Plan.  Overall
activities are generally progressing, however, it is perhaps too soon for the
impact to be evident in key indicator results. 
Actions – percentage progress against each priority and overall based on 
updates to the Council’s performance management software, Pentana. 
CORPORATE PLAN PRIORITY - ACTIONS RAG
Our People: Provide opportunities for people to be the best they can
be throughout their lives with a strong and sustained focus on those
individuals and groups in our society who experience the most
disadvantage and discrimination
50%
Our Place: Empower and support communities to build capacity 71%
Our Future: Drive economic development to create a vibrant
economy for the future
75%
Sustainable: Work towards a financially stable council that provides
valued services to our communities
71%
Overall 66%   
Performance Indicators – indicative rating based on key performance 
indicator results drawn from those included in the Corporate Plan Delivery
Framework for each priority and overall. 
CORPORATE PLAN PRIORITY – KPIs RAG
Our People: Provide opportunities for people to be the best they can
be throughout their lives with a strong and sustained focus on those
individuals and groups in our society who experience the most
disadvantage and discrimination 
Our Place: Empower and support communities to build capacity 
Our Future: Drive economic development to create a vibrant
economy for the future 
Sustainable: Work towards a financially stable council that provides
valued services to our communities 
Overall 
3.9 Highlight of Achievements – summarised from action updates and related
reports to service committees through the reporting period 
Our People: Children and Families – Provide opportunities where young 
people can achieve their potential and be the best they can be 
throughout their lives with a strong and sustained focus on those individual
and groups in our society who experience the most disadvantage and
discrimination 
Page 47

Page 48

• Funding targeted in support of identified children and families
• 1,200 devices rolled out to school pupils to reduce digital exclusion
• Attainment in literacy and numeracy showed improvement
• Growth in collaborative working across the Partnership
• Sustained improvement in initial positive school leaver destinations
• Moray Pathways Employability and Training Hub at the Inkwell launched in
July 2021
• Design brief for Findrassie Primary School approved
• Refreshed branding and increased presence on social media in Foster and
Kinship Care
• Decrease in the percentage of care experienced young people in the youth
and criminal justice systems
• NSPCC Graded Care Profile purchased and roll out planned for 2022/23
• Safe and Together Model training delivered 
Our People: Adults – Optimise outcomes for adults and older people by 
enhancing choice in the context of a home first approach delivery  through
the IJB 
• High demand within Occupational Therapy Service, addition of two Senior
OT Assistants have had positive impact on Critical referral waiting times
• Discharge to Assess (D2A) Initiative achieving improved patient outcomes
and overall cost savings in first 8 months of operation
• Community engagement exercise in relation to health and social care
provision in Lossiemouth concluded further informing options available
• Upscale of Hospital without Walls model progressed
• Increased use of Self Directed Support and the Three Conversation Model 
Our Place: Empower and support communities to build capacity 
• Three community asset transfers completed and initial assessments carried
out for two further proposals
• Revised Allotments Policy approved
• Rothes Play Area development completed as a participatory budgeting
project with Cullen, Findochty and Forres advancing
• Seventeen Community Councils reformed following elections in September
2021
• Moray Transport Forum relaunched
• Significant engagement activity around Active Travel and Children’s Health
and Wellbeing complete
• Locality planning re-invigorated 
Our Future: Drive economic development to create a vibrant economy of  the
future 
• Moray Growth Deal virtual signing in December 2021
• Moray Rural Centre of Excellence for Digital Health and Care Innovation
Centre first project to launch
• Moray Pathways Community Hub addressing digital skills gap
Page 48

Page 49

• Moray Employer Recruitment Initiative (MERI) scheme launched in April
2021, 106 individuals employed
• Around 33% of Kirkstart recruits completed 6-month placements
• Six Developing Young Workforce Co-ordinators delivering an improved
offer in the young person’s guarantee commitment 
• Five new Employability Team Keyworkers in place to support 16-25 year
olds
• Parent Poverty Employability Project launched in August 2021 addressing
barriers to parents participating in training and employment
• Route Map to Net Zero Carbon Emissions agreed
• Additional 16 electric vehicle chargers commissioned, total of 41 in place
across Moray
• 36 of 45 primary schools delivering Bikeability Programme 
Sustainability: Create a sustainable council that provides valued  services 
to our communities 
• Short to medium term Financial Plan approved
• Parent portal operational 
4 SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Corporate Plan sets out the council priorities and contribution
towards the 10 Year Plan (Local Outcomes Improvement Plan).   
(b) Policy and Legal
Consideration was given to relevant policy and legislative requirements
and direction in its preparation.  The Plan sets out direction for the
Council which may influence the development of future policy and this
will be reported where appropriate. 
(c) Financial implications
The Corporate Plan recognises that the council makes difficult decisions
to continue to work within budget constraints.  Setting out priorities
assists in making those decisions. 
(d) Risk Implications
The Corporate Plan employs robust risk management arrangements to
the decision making process that will be used in the management and
monitoring of the plan.  It is increasingly important that there is strong
political leadership, direction and resilience in the pursuit of the corporate
agenda. 
(e) Staffing Implications
None directly arising, however, the realignment of resources as the
Council’s business is reviewed may lead to workforce implications in
future which will be reported when relevant. 
(f) Property
None.
Page 49

Page 50

(g) Equalities/Socio Economic Impact
The Council’s ongoing commitment to equalities is reflected in the
Corporate Plan. 
(h) Consultations
The Corporate Management Team and Senior Management Team have
been consulted previously as part of performance reporting processes
that inform the content of this report. 
5. CONCLUSION 
5.1 The Council has made progress against the four priorities set out in the
2019-24 Corporate Plan, the past 12 months has reflected a period of
recovery and renewal and a planned review of Corporate Plan priorities
would enable a reset to take account of impacts and recovery.   
Although lessons in terms of complex planning and performance
management arrangements have been applied, further development and
refinement, particularly in relation to milestones and measurable
outcomes continues.   
Author of Report: Louise Marshall, Strategy and Performance Manager
Background Papers: Held with author
Ref: SPMAN-2045703626-168
Page 50

Page 51

APPENDIX 1 
Corporate Plan > 2024: Progress Update 2021-22 
1.  INTRODUCTION
1.1 The Council’s Corporate Plan is the primary statement of what we aim to achieve for 
the area and the resources that we require to do this.
1.2 Our Plan sets out our vision: A life of opportunity for all where people can thrive in 
vibrant communities and we work together to enrich our future’.
1.3 It sets out our values: Fair in tackling inequalities and tailoring services; Ambitious -
promoting Moray making it better for the most vulnerable; Improving - driving
improvement and investing in the future; Responsive - involving and listening to
communities. 
And our priorities:
• Our People: Provide opportunities for people to be the best they can be
throughout their lives with a strong and sustained focus on those individuals and
groups in our society who experience the most disadvantage and discrimination
• Our Place: Empower and support communities to build capacity
• Our Future: Drive economic development to create a vibrant economy for the
future
• Work towards creating a financially stable council that provides valued services to
our communities
1.4 As consequences of the COVID pandemic, there remains a very challenging 
economic and financial backdrop and need for recovery and renewal to address the 
social and economic harms, whilst maintaining normal services as far as possible and 
endeavouring to progress an improvement agenda in terms of the Best Value Action 
Plan and Corporate Plan priorities.
1.5 Service Plan updates, reported to Service Committees, have been used to provide 
the progress updates.  As supporting information, hyperlinks to reports that were 
submitted to Service Committees throughout the year have also been referenced. 
Item 9.
Page 51

Page 52

APPENDIX 1 
2.  PROGRESS
PRIORITY 1: 
Our People: Children and Families – Provide opportunities where young
people can achieve their potential and be the best they can be throughout
their lives with a strong and sustained focus on those individual and groups
in our society who experience the most disadvantage and discrimination 
OUR PEOPLE (CHILDREN & FAMILIES) - KEY PERFORMANCE INDICATORS AND TREND
BASED ON PREVIOUS RESULT (note: due to timing results may not relate to reporting
year)
Attainment Gap
75% of Looked after
leavers achieving
1+ awards at Level
4 (96.8% all
leavers) 
2020/21 
68.4% / (95.2%)
2019/20
BGE Attainment
% of pupils achieving
Level 3 / (Level 4) in S3: 
Literacy 83% / (24%)
Numeracy 88% / (56%)
2018/19 
No further updates
Destinations
94.1% of pupils
entering initial
positive
(LGBF rank 29
of 32) 
2020/21 
93.1% (LGBF
rank 14 of 32)
2019/20
Looked after Children
81.5% cared for in a
community setting
2021/22 
82.5% 
2020/21
Child Protection
2.3 per 1,000
0-15 population on
CP register 
2021/22 
1.6 per 1,000
2020/21
Improving  Worsening / (Improving)  Improving Worsening Worsening  
Corporate Plan Priority – progress against actions  RAG
1A Children and Families – Provide opportunities
where young people can achieve their potential to
be the best they can be 
72%
2A Children and Families – Improve health and
well-being for people of Moray 
33%
3A Adults – Optimise outcomes for adults and
older people by enhancing choice in the context of
a home first approach delivered through the IHB
47%
Overall  50% 
Delivery Framework Planned Corporate Level Outcomes 
The attainment gap between most and least disadvantaged children will reduce (1A)
2.1 Initially hindered by the lack of lead officer for child poverty, the GIRFEC Leadership 
Group is leading on this priority and progress has been made.  The ‘Make Every 
Opportunity Count’ (MEOC) toolkit and associated supports were considered by 
Locality Networks.  Moray Education Raising Attainment Strategy has a particular 
focus on closing the poverty related and wider attainment  gaps; attainment visits
10
5
3
18
2
CORPORATE PLAN PI'S
Above
Target
Within
Target
Below
Target
Data Only
Data not
available
38
Page 52

Page 53

APPENDIX 1 
with all secondary schools were completed with strengths and areas for
improvement identified and raising attainment targets reviewed.   Achievement of
Curriculum for Excellence Levels (ACEL) data was scrutinised and reviewed against
Northern Alliance Local Authority comparators.  Insight attainment meetings were
completed with data maps produced against key local measures.  Covid recovery
monies and Pupil Equity Fund funding were utilised to reduce the impact of the
effects of pandemic lockdowns and any lost learning, targeted in support of
identified children and families.  Over 1,200 Scottish Government devices were
rolled out to school pupils to reduce digital exclusion.  As a result of actions taken,
attainment in literacy  and numeracy showed improvement, 92.2% of leavers
attained level SCQF level 4 at SCQF level 4, an improvement from 86,3% the year
before and above comparator averages.
Improved attainment at both the Broad General Education and Senior Phase (1A)
2.2 Delivery of the Education Plan and Raising Attainment Strategy continues, 
attendance at Scottish Attainment Challenge events promoted the approach of
looking outwards to good practice nationally, as a result officers have participated in 
meetings with other local authorities.  Achievement of Curriculum for Excellence 
Levels (ACEL) early indication data and projections were collected to support target 
setting and challenge, positive destination data reviewed and analysed. 
Collaborative working across the Community Planning Partnership is growing, with 
the central education team supporting a wide range of groups which is impacting on 
core education work,  RAG rating based on priority and level of engagement required 
is being considered to manage these pressures.  Resources to support and improve 
data literacy and analysis capacity have developed in the reporting period to include 
sharing key data sets.  Seemis tracking and monitoring was rolled out across primary 
schools.  Post-Covid Parental Engagement Strategy drafted, linking to national and 
local priorities, with an action plan that supports personalised improvement plans. 
Next steps involve further consultation and approval. 
Young people are better prepared for life beyond school and for the workplace (1A)
2.3 To maximise training, employment and education opportunities for all school 
leavers, the Moray Skills Pathway, supported by four key partners, provides a single 
framework offering opportunities to develop skills, knowledge and attitudes 
required for the workplace.  All secondary schools are signed up to Career Ready. 
Pathway planning for all S3-S6 pupils is in place with strengthened links between 
schools and colleges to support the most vulnerable and disengaged young people. 
The impact of this can be seen in sustained improvement with 94.1% of 16-19 year 
olds participating in education, training and employment, just below the national 
average 95.5%.  The Moray Pathways Employability and Training Hub at the Inkwell 
was launched in July 2021, initially set up to target young people, the Hub supports 
all ages, amongst its successes around 500 people have used its variety of provisions, 
200 sessions have been delivered by partners and several marketplace events held.
Page 53

Page 54

APPENDIX 1 
An affordable, sustainable Learning Estate (1A)
2.4 The long-term plan element of tackling the affordability and standard of our schools 
is nearing completion.  Data reported that the condition of the school estate in 
Moray  has improved from 45.3% to  56.6% of schools graded B or better.  The 
Design Brief for Findrassie Primary School was approved and handed over to Design 
and Construction for development.  Community Engagement around the Learning 
Estate has progressed with completion of community information events, with head 
teacher and pupil engagement planned.  Options development for Elgin South, 
Learning Estate Investment Programme (Stage 3) projects and estate rationalisation 
continue to be reported to the Programme Board.   
More children live with their families and are cared for in strong, safe communities 
in Moray (1A)
2.5 Significant work has been completed on refreshing branding to increase the 
presence on social media.  Recruitment campaigns and face-to-face events feature 
the new branding which has led to an increase in enquiries.  Fostering leaflets 
updated to include reference to “The Promise” and new branding.  Advertising for 
foster carers and supported lodgings placements on payslips began and will continue 
on a 6 monthly basis and a recruitment working group meet regularly to coordinate 
delivery of the Fostering Service Plan and Kinship Improvement Plan.  Placement 
services were inspected in the reporting period, improvement actions will be 
incorporated within existing plans.  The Permanence and Care Excellence (PACE) 
working group, interrupted by Covid, reformed and through monitoring ensure 
effective permanence planning so the time taken and number of placements a young 
person experiences before achieving permanence reduces.  In the year to March 
2022, there was a small reduction in the number of children in kinship and foster 
care. 
Improve life chances and outcomes for care experienced children and young people 
(1A)
2.6 Increased use of business intelligence to identify and monitor care leavers and care 
experienced young people in the youth and criminal justice system has ensured 
plans, responsive to the young person’s needs, are in place to target support whilst 
in the service or for onward referral to other support agencies.  As at March 2022, 
11% of care experienced young people were in the youth and criminal justice 
systems, a decrease from 13% the year before.  With court business operating more 
regularly, processes for early  identification of care experienced young people is 
working well.  National benchmarking indicators for 2020/21 reported a reduction in 
the cost per week of residential placements, albeit above target.  In many cases 
residential placements are specialist for which Moray has no provision, for these 
placements children are accommodated in other local authority areas incurring 
higher direct and associated costs.  Costs have reduced in recent year due to
Page 54

Page 55

APPENDIX 1 
improvements in the proportion of children accommodated in community-based 
placements and an overall reduction in the number of children looked after. 
Improved outcomes for our more vulnerable young people and families (2A)
2.7 Interventions at the earliest opportunity improve outcomes, the NSPCC Graded 
Care Profile identifying early indicators of neglect was purchased.  The 
implementation plan outlines staff being trained as trainers to roll out the model 
across the Children’s Services Partnership over 2022/23.  Child protection 
training sessions were delivered with positive feedback received from staff. 
Partnership working continued around parental drug and alcohol misuse with a 
bespoke project supporting families of children on the child protection register due 
to parental substance misuse.  The Safe and Together Model: to keep children who 
have experienced domestic abuse safe and together with their non-abusive parent, 
while supporting and acknowledging non-abusive parents’ protective efforts and 
ensuring perpetrators are held accountable for their abuse is an important shift in 
culture.  Training for practitioners to become accredited trainers is ongoing with the 
first cohort of training to senior social workers in the team delivered. 
Our People: Adults – Optimise outcomes for adults and older people by
enhancing choice and control in the context of home first approach
OUR PEOPLE (ADULTS) - KEY PERFORMANCE INDICATORS AND TREND BASED
ON PREVIOUS RESULT (note: due to timing results may not relate to reporting
year) 
Independent Living
93% of adults able to look after
their health very well or quite well
(Scotland 91%)
2021/22 
93%
2019/20 
Independent Living
9,381 Emergency admissions 
(per 100,000 population)
(Scotland 11,636)
2021/22 
8,713
2020/21
Independent Living
72% of adults supported at
home who agreed they felt safe
(Scotland 80%)
2021/22 
79%
2019/20
No Change Worsening Worsening 
People are able to look after and improve their own health and well-being and live in 
good health for longer in home environments that support independent living (3A)
2.8 To enable people to have greater opportunity to remain independent within their 
communities, Health and Social Care Moray provides equipment and adaptations to meet 
their needs.  Demand for the service is high, with an average of 224 referrals per month in 
2021/22.  Two Senior OT Assistant posts with responsibility for the more complex 
adaptations were established which has had a positive effect on Critical referrals waiting 
times.  However there remains significant delays for Substantial and Moderate priority
Page 55

Page 56

APPENDIX 1 
referrals.  The supply line for specialist equipment has seen increases in price applied to 
around 70% of the range as well as delivery timescales.   
People are able to live independently at home or in a homely setting in their 
community (3A)
2.9 Many plans under development have had to be fast tracked in response to the 
pandemic.  Discharge to Assess (D2A) is one initiative developed within the Home 
First programme as an immediate care approach aimed at securing early discharge of 
clinically stable hospital in-patients who require short-term support.  The initiative 
launched in August 2021 with permanent annual funding secured.  Results for the 
period to March 2022 show an average length of treatment once discharged home 
with support was 11 days, making a service cost per day per patient of £169, on 
average around 60% less than that of a hospital bed.  Despite staffing challenges and 
not operating at optimum, overall cost savings in the 8 month period were estimated 
at £33k.  Patient outcomes also improved with a lower risk of readmission and 
excellent results in the standardised outcome measures recorded.   
People who use health and social care services have positive experiences of those 
services, and have their dignity respected (3A) 
2.10 Choices and control for service users over decisions affecting their care and support  
in relation of the Health and Social Care provision within the Lossiemouth locality
began in September with the commencement of a community engagement process
which ran from October 2021 to March 2022, involving a survey and six    
engagement events.  The Board, having considered the findings detailed in the 
engagement report approved the continued temporary branch surgery closures and  
approved a further consultation. 
Assess and respond to the housing needs of older people in partnership with IJB (3A)
2.11 This will be progressed in 2022/23 with the development of the Housing Need and 
Demand Assessment, in which the IJB is a valued partner.   
Page 56

Page 57

APPENDIX 1 
PRIORITY 2: 
Our Place: Empower and support communities to build capacity
OUR PLACE - KEY PERFORMANCE INDICATORS AND TREND BASED ON PREVIOUS
RESULT (note: due to timing results may not relate to reporting year)
Community Asset Transfers
3 of 8 completed
2021/22
2 of 8 completed
2020/21 
Participatory Budgeting
2.8% of target spend achieved
2021/22 
1 pilot project underway, further work
required to meet PB activity target
Locality Planning
1 new Community Action Plan in
place 2021/22
3 new areas agreed but none
completed 2020/21
Improving No Change Improving
Note – significant impact still evident from pandemic restrictions
Corporate Plan Priority – progress against actions  RAG
1B Empower communities to build capacity by
becoming more informed, involved and influential
in service delivery 
72%
2B Improve our understanding of the issues in our
communities based on the experience of local
people 
70%
Overall  71% 
Delivery Framework Planned Corporate Level Outcomes 
Our communities’ ability to address their own needs and aspirations is improved (1B)
2.12 Whilst good progress has been made, the target to complete 8 community asset 
transfers has not been met.  The pandemic severely hindered processes to progress 
transfers as planned.  During 2021/22, transfers were completed for the Fisherman’s 
Hall in Buckie, West Dune Toilets in Findhorn and Findochty Town Hall and initial 
assessments were carried out for Forres Skatepark Group and Garmouth and 
Kingston Community Association.  Support to Portknockie Community Association to 
gain charitable status was also completed.  A revised Allotments Policy was approved 
by the Corporate Committee in March 2022 identifying the services working 
together to develop allotment sites at Pinefield, Elgin. 
Develop and implement Participatory Budgeting (1B) 
2.13 The Participatory Budgeting (PB) Steering Group continue to work to identify 
budgets for PB, raising awareness across the council and further exploring 
mainstreaming options.  In the reporting period, PB projects contributing to the 
Scottish Government indicative target have focused mainly around play areas with 
Rothes complete and Cullen, Findochty and Forres ongoing.
0
1
2
00
CORPORATE PLAN PI'S
Above Target
Within Target
Below Target
Data Only
Data not
available
3
Page 57

Page 58

APPENDIX 1 
More of our activities, services and plans are influenced by the communities they 
serve (2B)
2.14 Following the tsiMoray event Power to the People, the Community Planning 
Partnership Community Engagement Strategy is being refreshed to support the 
development of stronger, more resilient communities capable of meeting their own 
needs and aspirations.  All seventeen Community Councils reformed following 
elections in September 2021 with in excess of 120 members in place, ongoing 
training needs are being addressed with a programme of learning.  The Moray 
Transport Forum was  relaunched following an event attended by 19 community 
delegates.
2.15 The draft Active Travel Strategy was consulted on with a survey link and QR code 
made available followed by virtual events in March 2022, responses received 
were considered in finalising the strategy.  The planning around the Health and 
Wellbeing Census used to improve the way children’s services are planned and 
delivered was completed before its launch in the final term with analysis expected to 
begin in September 2022. 
We are more successful in developing a shared understanding between the council 
and communities that helps us to design the future together (2B)
2.16 Progress in locality planning continues; consultation analysis from engagement in the 
Buckie locality is being considered to improve the services and support provided 
locally and the steering Group is exploring the establishment of a Development 
Trust.  Funding was secured for the Fisherman’s Hall to provide taster sessions for 
new activities to expand user groups, community lunches restarted.  The Locality 
Plan for New Elgin has been revised, identifying four themes of Healthy 
Communities, Environment and Structure, Community Involvement and Education 
and Employment which subgroups are driving forward.  The Lossiemouth 
Development Trust used a coffee morning in February to feed back the results 
relating to their locality plan while Forres held a Spirit in the Community event in 
April.  Keith has undertaken initial mapping of service provision in the area.  A 
repeating issue is the limited options for partners to co-locate which is a 
consideration of the ongoing council estate reviews.   
Page 58

Page 59

APPENDIX 1 
PRIORITY 3: 
Our Future: Drive economic development to create a vibrant economy of the
future
OUR FUTURE - KEY PERFORMANCE INDICATORS AND TREND BASED ON PREVIOUS
RESULT (note: due to timing results may not relate to reporting year)
Tourism 
£57.6m economic
impact
2002/21 
£134.2m
2019/20 
Youth population 
15.3% of 16-29
years olds within
Moray population
2021/22
15.1%
2019/20 
Living Wage 
21.5% of people
earning less than
the living wage
2020/21
24%
2019/20
Earnings 
£565.80 median
gross weekly
wages
2020/21
£561.60
2019/20
Pay Gap 
£176.10 median
gross earnings
pay gap 
2020/21
£84.50
2020/21 
Modern
Apprenticeships
78% achievement
rate in Moray
2020/21 
76%
2019/20
Worsening Improving Improving Improving Worsening Improving 
Corporate Plan Priority – progress against actions  RAG
1C Create a step change in the regional economy
to enable inclusive economic growth 
88%
2C Work to protect and enhance our environment,
creating a more resilient and sustainable future 
63%
Overall  75% 
Delivery Framework Planned Corporate Level Outcomes 
Increase economic impact of tourism in Moray and increase the level of 16-29 years 
living and working in Moray (1C)
2.17 The regional deal is designed to boost economic growth across Moray by investing 
over £100m in eight strategic projects.  
• Moray Aerospace, Advanced Technology and Innovation Campus (MAATIC) 
• Business Enterprise Hub 
• Cultural Quarter 
• Housing Mix Delivery 
• Early Years STEM (Science, Technology, Engineering and Maths)
• Bus Revolution 
• Manufacturing and Innovation Centre for Moray (MICM)
• Digital Health 
The virtual signing of the full deal completed in December 2021.  Work on all 
Growth Deal projects progresses with the focus during 2021/22 on finalising full
1
1
1
7
0
CORPORATE PLAN PI'S
Above Target
Within Target
Below Target
Data Only
10
Page 59

Page 60

APPENDIX 1 
business cases.  Moray Rural Centre of Excellence for Digital Health and Care 
Innovation Centre hosted an online information event on 23 March 2022 to 
present the vision, launch the Living Lab challenge areas and invite participation in 
centre  activities ahead of the formal launch of the Centre in June with an official visit 
from UK and Scottish Government representatives.  The Council is lead partner for 
the Cultural Quarter, Housing Mix Delivery, Bus Revolution and Early Years STEM. 
Better employment, skills and earnings, increase in higher skilled jobs and wage 
levels through (1C)
2.18 The Moray Skills Investment Plan was put on hold during the pandemic with 
economic recovery taking priority in which a significant programme of employability 
activities was launched through collaboration with local partners.  
• A Moray Pathways  Community Hub created for employability clients to address
the digital skills gap launched in May 2021 has provided 179 devices to people in
Moray in support of their learning and training needs and over 200 individuals
have benefited through their engagement with hub activities.  
• The Moray Employer Recruitment Incentive (MERI) scheme was launched in April
2021 offering £8k for employers who provide a supported job placement for 12
months aimed at encouraging recruitment of young people aged 16-24 years who
had opportunities.  In the year to March 2022, 106 individuals were employed
through the MERI scheme.  
• Kickstart was a one year programme, administered by the Department of Work
and Pensions (DWP) which completed in March 2022 offering 6 month work
placements to 16-24 year olds.  In total 144 Kickstart placements were filled
through the Moray Chamber of Commerce with around one third completing
placements.  Complete Kickstart data has not been made available by DWP in
order to make an overall assessment.  
• Six Developing Young Workforce (DYW) Co-ordinators were recruited to support
employer engagement in schools and deliver the young person’s guarantee
commitment, resulting in an improvement in the range of placement and sector
based opportunities available for secondary pupils.  
• Enhanced keyworker support within the No One Left Behind model increased
following the recruitment of 5 keyworkers within the Employability Team to
support 16-25 year olds, two of which support twelve care experienced, young
people who are matched to a volunteer mentor for 12 months. 
• European Social Fund; Employability Challenge Fund provided investment of
£800k resulting in commissioned services to deliver sector based training
programmes for those furthest from the labour market benefitting care
experienced young people, people with disabilities and individuals with mental
health issues.
• The Parent Poverty Employability Project launched in August 2021, has received
25 referrals in the period to March 2022.  The project is seeking to address the
barriers to parents participating in training and employment..
Page 60

Page 61

APPENDIX 1 
• The development of an Apprenticeship Strategy and Action Plan is progressing. 
Achievement of targets, indicators and outcomes identified in Climate Change Action 
(2C)
2.19 The Climate Change Strategy and Action Plan was agreed by Council on 10 March 
2021, setting a goal of being carbon neutral by 2030.  A detailed pathway, by way of 
a Route Map to Net Zero Carbon Emissions that sets out how the Council could reach 
net zero, forecasting how emissions will be reduced through the Council’s actions, 
was agreed by Council on 6 April 2022.  An annual progress report on the route map 
will be submitted to the Economic Development and Infrastructure Committee to 
provide regular updates against actions and emissions progress. 
Increased provision and use of electric vehicles and plant with supporting 
infrastructure (2C) 
2.20 In 2021/22, 16 public electric vehicle chargers were commissioned, taking the total 
charging points across the Moray area to 41.  Progress in promoting and developing 
active and green travel plans was made with 36 of 45 primary schools delivering the 
Bikeability programme, resulting in the highest recorded sustainable journeys by the 
Travel Tracker Programme since its introduction in primary schools.   
Implement surface water infrastructure improvements in vulnerable flood risk areas 
(2C)
2.21 The development of surface water management plans has not progressed as 
planned due to issues relating to the funding of the Cycle 1 Flood Scheme, therefore 
planning for Cycle 2 cannot be confirmed, leading to a national agreement to delay 
the requirement to publish water management plans by 6 months until December 
2022. 
Page 61

Page 62

APPENDIX 1 
PRIORITY 4: 
Sustainability: Create a sustainable council that provides valued services to
our communities
SUSTAINABLE COUNCIL - KEY PERFORMANCE INDICATORS AND TREND BASED ON
PREVIOUS RESULT (note: due to timing results may not relate to reporting year)
Financial Planning
0% of recurring expenditure funded
from free general reserves
2020/21
Online Services
53% of pupils matched on Parent
Portal
38%
2020/21 
Change Management
34% of employees experiencing
change that were satisfied with
the way the change management
process was handled
2019/20 – no further updates
No Change Improving No change 
Corporate Plan Priority  RAG
1D Council’s Financial Strategy  50%
2D Modernisation and Improvement:
transformation to achieve 
62%
3D Developing Workforce  100%
4D Developing Workforce: transformation
and change 
75%
Overall  71% 
Delivery Framework Planned Corporate Level Outcomes 
Council’s Financial Strategy (1D) 
2.22 The latest report on the short to medium term financial planning was presented to 
Council on 19 January 2022.  The 2022-23 Budget and 2022-25 Financial Plan was 
submitted to Council on 22 February 2022.  The development of a revised medium to
long  term financial strategy is anticipated to complete by February 2023. 
Modernisation and Improvement: Transformation to achieve (2D)
2.23 Review of the ICT and Digital Strategy continues reflecting the impact of COVID, for 
example increased homeworking, learning and teaching, digital communications and
video conferencing.   The Parent Portal became operational and marketing to
increase sign up is planned.  Extending the availability of online services to Children’s
Social Work Services has faltered due to limited resources but remains as work
outstanding.  
Page 62

Page 63

APPENDIX 1 
Developing Workforce (3D)
2.24 Interim Workforce Plan 2020-22 was agreed by Committee in November 2020,
setting out workforce planning will support the delivery of council services.  A move
into COVID recovery and renewal phase enabled reinstatement of Strategic Trade
Union / Officer Group meetings.   
3.  BACKGROUND PAPERS
Throughout the reporting period, related reports have been submitted to Service
Committees, these are included as links below for reference purposes.
PRIORITY 1 Analysis of Secondary School Leaver  Attainment 2020/21 
Improvement and Modernisation Plan – Raising Attainment Curriculum Breadth
and Digital Progress Update: Appendix 1 Education Improvement and
Transformation, Appendix 2 PIN Digital Inclusion 
Analysis of Secondary School Attainment Insight Benchmarking Measures 2021 
Initial Analysis of Achievement of Curriculum for Excellence Levels 2021 
Initial Attainment Report for Secondary Schools 2021 
Learning Estate Investment Programme – Phase 3 Submission Update 
2021-22 Quarter 4 Performance Report to Moray Integration Joint Board:
Appendix 1, Appendix 2, Appendix 3
PRIORITY 2 Publication of Refreshed Partnership Community Learning and
Development Plan 2021-24; Appendix 1, Appendix 2
PRIORITY 3 Economic Recovery Plan Delivery
Route Map to Net Zero Carbon Emissions; Appendix 1, Appendix 2
PRIORITY 4 Short to Medium Term Financial Planning; Appendix 1, Appendix 2
Interim Workforce Plan 2020-22 
Page 63

Page 64

Page 64

Page 65

REPORT TO:   MORAY COUNCIL ON 28 SEPTEMBER 2022 
SUBJECT: OFFICE REVIEW UPDATE – SMARTER WORKING 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 This report provides an update on progress with the Office Review following
the recommendations set out within the Property Asset Management
Appraisal and outlines the strategic objectives to deliver sustainable hybrid
ways of working for the future. 
1.2 This report is submitted to Committee in terms of Section II (15) of the
Council's Scheme of Administration relating to the provision of office
accommodation for all departments of the Council. 
2. RECOMMENDATION 
2.1 It is recommended that the Council: 
i) considers and notes the progress on the Office Review since June
2021; and 
ii) notes the approach of a staged implementation of the Office
Review alongside the implementation of the revised flexible
working policy under a combined project titled “Smarter
Working”. 
3. BACKGROUND 
3.1 A report providing progress on the office review was provided to Moray
Council at the meeting on 30 June 2021 (para 15 of the minute refers).  This
report set out the approach for a staged review of office accommodation
following the impacts of the Covid-19 pandemic and the subsequent roll out of
ICT equipment to enable staff to work from home. Further reporting has not
been possible until now as progress has been slower than expected due to
staffing changes and capacity issues including pandemic response and
recovery. 
3.2 The original purpose of the Office Review (arising from the Property Asset
Management Appraisal (PAMA) recommendations) was to provide a strategic
overview of council offices; how they are used; what opportunities there may
Item 10.
Page 65

Page 66

be to co-locate services to improve joint working for further investigation; and
examine opportunities to reduce operational costs through a programme of
rationalisation. 
3.3 These objectives have been developed into a strategic approach for the
“Smarter Working” project which will deliver modernised working
environments for office based staff across all services, through the design and
adoption of principles and standards consistently applied for all but which
provide flexibility where needed. 
3.4 This approach combines reviewing organisational development needs
supported by the revised Flexible Working Policy, guidance and toolkits
(separate agenda item), with the review of requirements of types of functional
spaces, ICT infrastructure and equipment to meet service needs. 
3.5 It is useful to consider the strategic approach that overarches both projects
given the scale and significance of the changes and this is outlined in section
4.8 of this report.   
4. STAGED APPROACH 
Progress since 30 June 2021
4.1 All short-term objectives outlined in the previous office review report have
been completed. 
4.2 Heads of Service have worked with teams to utilise up to half of HQ campus
desk spaces within their current designated areas or rooms with any
consequential adjustment to rotas at this stage being dictated to an extent by
the space available and distancing requirements. Heads of Service and
service managers are best placed to make these adjustments and discussions
are ongoing as regards the interplay between allocated space and particular
service needs. 
4.3 Circulation routes have been removed and common spaces are managed in
line with applicable government guidelines. 
4.4 Desktop ICT equipment has been provided for approximately 50% of the
available desks. 
4.5 Space has been released for collaborative work which allows teams to come
together in person and block booking of meeting rooms, committee room,
chamber and training spaces is being managed. 
4.6 Highfield House has been released and staff have been accommodated in
Southfield Offices, Elgin. 
4.7 9 North Guildry Street was previously identified for release.    Existing services
located at this property will be relocated as part of the overall project. There is
appraisal work being undertaken with NHS Grampian officers to establish the
potential for an identified alternative use. 
4.8 The high level timescale for the project is detailed in Appendix I.
Page 66

Page 67

Strategic Case for the Project
4.9 “Smarter Working” will combine the new approach to ways of working with the
office accommodation review and the requirement to reduce our carbon
footprint. The project governance structure is set out in Appendix II. 
The aims of the project are to:- 
• Develop the organisational culture, skills and environment to embrace and
embed flexible and hybrid working 
• Improve organisational resilience 
• Improve employee motivation, morale and wellbeing 
• Attract and retain quality, creative, motivated and productive staff 
• Provide seamless access to sustainable, modern working environments
which support delivery of high quality, efficient and effective services 
• Reduce the environmental footprint of our working practices 
• Increase efficiency and effectiveness of utilisation of functional spaces
within Moray Council office accommodation, reducing the cost of running
the council by better use of assets
To progress these strategic aims, a Project Board has been established to
oversee delivery. The project will adopt a staged approach to the
implementation of the hybrid ways of working which is dependent on the
revised flexible working policy with scope for review after each phase based
on learning as the overall project progresses. Accommodation for members is
not included in scope of the project for rationalisation, however the project
team will work with members and party groups to optimise the configuration of
their space. 
4.10 The current approach for use of office space is as per government advice
regarding the reduced occupation of offices during Covid-19.  This will be
revised as part of the “Smarter Working” project, where the project team will
work with services and staff to identify what support they need to adopt hybrid
working as fully as possible and to determine the necessary reconfiguration of
appropriate functional space and equipment to meet service needs. 
4.11 The new draft flexible working policy is framed around a model where the
organisational standard would be an expectation that staff operate a hybrid-
working pattern of 2 days in the office and 3 from home or another remote
location.   This is a guide from which variations may be made. It is recognised
that there will be staff who do not have suitable workspaces at home or who,
Page 67

Page 68

for mental health or similar reasons, want or need to be based permanently in
offices and equally those who, for good reason, wish to work from home.  The
flexible working policy accommodates the requirement to consider service and
individual needs and service managers, team leaders and supervisors will
engage with staff regarding this. 
4.12 Following removal of pandemic restrictions by Scottish Government in March
2022, services have returned to offices utilising up to 50% of the desks
available in their allocated areas.  The return was restricted initially due to the
desire to maintain safe working distances whilst incidences of Covid remain
high.  The majority of services have managed to deliver effective services
working within these parameters and a process for service adjustments is in
place to accommodate other service or individual needs.  While the pandemic
related measures and constraints have reduced, the Council has retained an
element of office space management in order to retain the progress made
with remote working over the last two years given the close alignment with the
organisational aims as stated in section 3.2. 
4.13 The Project will adopt a staged approach commencing with engagement and
consultation with managers and staff to design and define the types of
functional spaces required, with a soft launch element to help prepare
managers and staff for the changes that are to come.  Once services have
identified what is required the property will be reconfigured and the new ways
of working will be implemented.  The initial focus will be on those services
operating from the HQ campus but this will be followed by further phases
relating to other Elgin offices and then those out of Elgin.  This phasing is in
line with the June 2021 Office Review report’s identified medium and longer-
term objectives to maximise the use of buildings within Elgin and review use
of Southfield, 9 North Guildry Street and Beechbrae office accommodation. 
4.14 Following the process described,  a number of benefits will be delivered by
the project including reduced operational costs for office buildings, reduced
travel costs,  improved employee health and wellbeing and increased
organisational resilience. A Benefits Realisation Plan will be part of the
Business case when fully developed.  
Project interdependencies
4.15 There are many projects that are underway in the Council that will have links
and dependencies with the formalisation of hybrid ways of working and the
review of office accommodation as set out in Appendix III.  In addition, there is
further investigation needed to make decisions regarding the following
properties:- 
4.16 The review of the Additional Support Needs (ASN) function is progressing,
therefore no recommendations have been made until this has been reported.
Once this review is complete, it will allow further options within the office
estate to be considered. 
4.17 A review of the use of premises operated in conjunction with Health & Social
Care Moray and NHS Grampian will also be undertaken to consider options
for future use where co-dependencies exist. 
Page 68

Page 69

4.18 The offices located at 232/240 High Street Elgin have various complexities
linked to the title of the property and these will require to be addressed before
decisions on disposal, so this property will feature in a later phase. 
Property Disposals
4.19 30/32 High Street, Elgin is vacant and declared surplus.  It is in the process of
being put on the market for sale.  Meantime, the ground floor is to be used
temporarily as a pop up shop by the Economic Growth and Regeneration
team as part of the Economic Recovery Plan. 
4.20 The lease of Highfield House was terminated in November 2021 and staff
relocated to 9C Southfield, Elgin. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
This project forms part of the Improvement & Modernisation Programme
(IMP) of Work that supports the Council priority of effective asset
management and digital services of a financially stable Council. 
(b) Policy and Legal
These proposals have significant co-dependencies with implementation
of the Flexible Working Policy. 
(c) Financial Implications
The financial implications of this report will be further determined as the
business case progresses. Whilst there are no specific implications of
this report, the savings from rationalisation identified to date are
expected to be £37.5k in 22/23, £68k in 23/24 and £300k in 24/25, albeit
not all of these will be cashable savings to the Council. However,
expenditure to create modern workspaces will also be required and
costings are being collated as part of business case development. 
(d) Risk Implications
There is a risk of lack of staff capacity of those involved in planning and
appraising the potential options for changes, which may impact project
delivery timescales.   
The senior project officer responsible for effective coordination of this
project, to ensure aims are met and services are provided with right type
of space and equipment to support productive and effective services, is
in post till July 2023 and if the timescales drift this will be a risk to
successful delivery. 
Lack of staff capacity to engage with consultation process fully may
impact on the achievement of a successful solution for the service at the
first attempt, requiring additional rework and causing delays to the
project progress. 
Page 69

Page 70

There are still some impacts from Covid-19 on the supply chain for some
ICT kit, which may impact on delivery timescales. 
The costs of options for the project are being collated for the business
case and if the preferred options are prohibitive at this stage there may
be a requirement to phase the roll-out of hybrid working over a longer
period. 
There is a risk that with significant energy price increases more officers
may seek to work in the office through winter months and this will have
to be managed in line with policy. 
(e) Staffing Implications
Council at its meeting of 12 May 2021 (paragraph 2.2 refers) agreed to
set up a project team to support the implementation of the IMP
programme including resource to support the progression of the Office
Review.  A senior project officer has now been appointed and the project
team is in the process of being identified.   
Staffing implications arising from the “Smarter Working” project will entail
consultation and engagement with the recognised Trades Unions as per
agreed Council policy and protocols as well as discussion and
agreement between managers and employees as described in section
4.10 of the report. 
(f) Property
These are set out in the report. 
(g) Equalities/Socio Economic Impact
Whilst there are no direct equalities/socio economic impacts arising from
this report, these will be progressed as required as part of the business
case preparation. 
(h) Climate Change and Biodiversity Impacts 
An assessment of the impact on the Council carbon footprint of the
introduction of sustainable hybrid working will be incorporated into the
project. 
(i) Consultations 
Consultations on this report have taken place with the Head of Human
Resources, ICT and Organisational Development, and Tracey
Sutherland, Committee Services Officer and any comments have been
incorporated into the report. The Office Review has been consulted on
with CMT/SMT and the views of Heads of Service have been
incorporated into the Review approach and Business Case as these
develop.  
Page 70

Page 71

6 CONCLUSION 
6.1 This report provides an update on the progress with the Office Review
from June 2021 and makes a recommendation further progress is
reported as part of the “Smarter Working” project. 
Author of Report: Edward Thomas, Head of Housing and Property Services
Background Papers:   30 June 2021 Office Review
Ref:    SPMAN-1285234812-1149
Page 71

Page 72

Page 72

Page 73

Appendix I 
Item 10.
Page 73

Page 74

Page 74

Page 75

Appendix II
DRAFT Proposals for SMT/CMT 15/8/22 
Item 10.
Page 75

Page 76

Appendix II
DRAFT Proposals for SMT/CMT 15/8/22 
Page 76

Page 77

Appendix II
DRAFT Proposals for SMT/CMT 15/8/22
Group Purpose Representing Member
Moray Council Approve strategic objectives, scope
and principles of project  
Project
Sponsor
To lead project for Council.
Member of the Transforming
Programme Board.
CMT Rhona Gunn
Workplaces of
the future
Board
(Previously
Smarter
Working
Group)
1. Managing the delivery of Future
Workplaces project for the Council
2. Own the project plan
3. Represent the future users and
providers of the project – agree
and establish the quality standards
4. Maintain strategic alignment of
project with organisation strategy
5. Resolve conflict
6. Manage:
Risks/Assumptions/Dependencies/
Issues / Changes
7. Sign off – new ways of working
8. Benefit realisation
9. Quality assurance
10. Compliance with TMC “Gateway
Policy” 
H&PS 
OD 
ICT 
Project 
Services 
Edward Thomas, Neil
Strachan
Frances Garrow,
Katrina McGillvray
David McKay,
Graham Cooper 
Jeanette Netherwood 
Heads of Service
Workplaces of
the future
Delivery Group
1. Develop and manage the project
plan
2. Day to day management of the
project
3. Ensure delivery of new ways of
working
4. Monitor Progress
5. Manage RADIC
6. Manage Service and Project
Resources
7. Report to Project Board
Property 
Climate Change
ICT
HR & OD
Communications 
Geoff Newell / Kevin
Black
Rod Lovie
Tbd
Tbd
Page 77

Page 78

Appendix II
DRAFT Proposals for SMT/CMT 15/8/22
8. Map Benefits 
Engagement
Group 
Hybrid
Working
Champions
Representatives of services, and
types of service, to help design the
principles, standards and approach for
implementation 
All types of
service delivery
and services
Tbd 
Workplaces of
the future
Delivery sub
groups
Specific topic groups to progress
elements of the plan 
Communication and Engagement
planning group
Communications
HR/OD
Climate Change
Project
Kirsty Craig
Katrina McGillivray
Sophie Ward
Jeanette Netherwood
Others tbd 
Service
implementation 
1. There will be a requirement for
significant service input to
identifying the needs, defining any
the new processes required,
managing the transition and
deliver the benefits.
2. Service managers will be
supported by specialist staff (ie
OD team, ICT, Property, climate
change)
3. Service managers will have
responsibility for implementation of
the agreed principles and
standards within the Service
4. Assist in the identification of need,
type and facilitate implementation
of training
All types of
service delivery
Nominated Core
Contact for co-
ordination 
(by HoS) 
Hybrid working
champion from
service 
Service managers 
Project
implementation team
Page 78

Page 79

Appendix II
DRAFT Proposals for SMT/CMT 15/8/22
5. Identify other opportunities not
included in the business case
6. Develop operational plans,
policies and procedures and KPIs
for their services. 
Page 79

Page 80

Page 80

Page 81

Appendix III 
Item 10.
Page 81

Page 82

Page 82

Page 83

REPORT TO: MORAY COUNCIL ON 28 SEPTEMBER 2022 
SUBJECT: FLEXIBLE WORKING POLICY REVIEW 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To ask that Council consider and approve the updated flexible working policy
for implementation to Local Government Employees, Craft Operatives and
Chief Officers and note that this is a key enabler for other projects to realise
their potential benefits. 
1.2 This report is submitted to Council in terms of Section III (B) (24) of the
Council's Scheme of Administration relating to the formulation, implementation
and review of policy and practices for employees, other than teachers. 
2. RECOMMENDATION 
2.1 It is recommended that Council: 
i) consider and approve the revised flexible working policy for
implementation; and 
ii) note that this is a key enabling element in the progress of
organisational change with regard to the stated implementation of
the Office Review under a combined project of “Smarter Working” 
3. BACKGROUND 
3.1 The Council currently has a flexible working policy in place for Local
Government Employees, Craft Operatives and Chief Officers supported by a
range of procedures and guidance.   This was under review pre-pandemic as
part of the transformation work in the Improvement and Modernisation
Programme.  The purpose was to have an approach that supported the
implementation of change across the organisation including a focus on policy,
technology and property issues. 
3.2 Considerable work was undertaken with a project plan, timescales and draft
report completed following consultation with a range of service and
operational managers and employees. 
Item 11.
Page 83

Page 84

3.3 When the pandemic hit, the organisation was catapulted into responding to
ensuring that arrangements were put in place to enable mainly office based
staff to be able to work from home rather than the office.  This included a
focus on technology primarily but also elements of policy and guidance that
were required on an interim basis to support the move to working from home. 
3.4 Now that the Council is in the recovery and renewal stages of response, there
continues to be a requirement to review the Council’s approach to flexible
working as there was pre-pandemic.  However, the Council now needs to take
stock of the learning and opportunities arising from the changes in ways of
working that were required, particularly around working from home. 
3.5 This presents the Council with an opportunity to take a strategic approach to
achieve a number of key organisational objectives with an enabling
employment policy that provides a firm foundation for efficient delivery of
services with a focus on excellent customer service.  Developing the
organisational culture, skills and environment will enhance both the
organisation’s and individual employees’ capacity to embrace and embed
flexible and hybrid working as a cultural norm and to achieve improved
organisational resilience, motivation, morale and wellbeing.  It is an
opportunity for working collaboratively to benefit the organisation and
individuals through enabling ways to maintain the positive aspects of working
at home, providing the right functional spaces required by individuals and
teams to deliver services whilst reducing the collective carbon footprint and
working towards the target of being carbon neutral by 2030.  Providing
seamless access to the workplace that meets customer, staff, service and
organisational needs will support the Council as an exemplar for providing
effective and efficient modern office and functional spaces, delivering quality
services and helping reduce the Council’s carbon footprint. 
3.6 Strategic aims and objectives have been developed and the joint project with
Property Services and HR, ICT and Organisational Development currently has
a working title of “Smarter Working”.   Change to organisational culture
depends on people changing their attitudes, behaviours and thinking and is
known to take time.    The initial strategic aims and objectives therefore reflect
the current longer term aspiration for the Council and scope for review based
on learning as the overall project progresses will be built in allowing for flex
and adjustment as deemed necessary. 
The ”Smarter Working” project will combine the new approach to ways of
working with the office accommodation review and the requirement to reduce
the Council’s carbon footprint. 
The aims of the project are to:- 
• Develop the organisational culture, skills and environment to embrace and
embed flexible and hybrid working 
• Improve organisational resilience 
• Improve employee motivation, morale and wellbeing 
Page 84

Page 85

• Attract and retain quality, creative, motivated and productive staff 
• Provide seamless access to sustainable, modern working environments
which support delivery of high quality, efficient and effective services 
• Reduce the environmental footprint of our working practices 
• Increase efficiency and effectiveness of utilisation of functional spaces
within Moray Council office accommodation, reducing the cost of running
the council by better use of assets 
3.7 To progress these strategic aims, a Project Board has been established to
oversee delivery. The project will adopt a staged approach to the
implementation of the hybrid ways of working which are dependent on the
revised flexible working policy with scope for review after each phase based
on learning as the overall project progresses. 
3.8 The revised Flexible Working Policy is attached as Appendix 1 and
background papers in the form of guidance, toolkit, checklists support the
implementation and roll out of the revised policy and can be found as
additional meeting documents on the meeting page on CMIS. 
4. HYBRID WORKING FOR OFFICE-BASED STAFF 
4.1 With the lifting of restrictions and a return to workplaces possible, the
organisation needs to consider the longer term requirements in terms of ways
of working.   The main drivers are no longer based on public health advice
and the risks of contracting COVID-19 but are more focused on supporting
transformation through organisational change, including organisational
development requirements, property requirements, climate change
responsibilities and continuous improvement in efficiency and effectiveness of
high quality, customer focused service delivery. 
4.2 The organisation can capitalise on the experience of working from home,
learning the lessons from managers and employees’ perspectives and
develop a model of hybrid working which rather than setting hard and fast
mandates, offers flexibility within guidelines. 
4.3 The key benefits of hybrid working can be realised by combining location
flexibility with time flexibility and this has been taken account of in the
guidance that has been developed.  Results from two staff surveys have
indicated respectively that over 80% of employees whose jobs suit hybrid
working would like to retain a combination of home and office working or
prefer to remain at home on a regular basis and an increasing number of
respondents (39% to 44%) felt working from home was continuing to have a
positive impact on their mental health. 
4.4 Amended Workstyles – the workstyles that were adopted when the current
flexible working policy was agreed needed to be reviewed to reflect current
and future requirements and the ways of working that have been in place
during the pandemic, summarised in Table 1.
Page 85

Page 86

TABLE 1 
Fixed  There will still be a need for a small number of “Fixed” workers with a
requirement to be in a particular workplace in order to carry out their
remit, whether this is a fixed desk space in an office or a fixed
workplace in terms of front line service delivery.
Hybrid Rather than having a “Flexible” worker category, it is suggested that a
“Hybrid” categorisation is more reflective of what is required going
forward and will apply to the majority of office based staff. 
This would include those who require to spend part of their time in an
office or other workplace and part of their time at home and those
who do not need a particular base as they are operational in the field
but who may need to touch down in an office or other workplace or at
home. So there is a range of types of hybrid worker, e.g. those who
will work from home on fixed days and work at Council premises on
other fixed days; those who will work between Council premises and
home depending on service delivery needs and line managers
approval and those who are working on a more mobile basis with
their base at home and who travel to different premises or those of
their customers.
Home A “Home” worker category is required to include those that are able
to fulfil the remit of their role wholly from home, with limited
requirements to attend the office or other workplace (e.g. attendance
for team meetings, collaborative work as required but not on a regular
weekly basis). 
4.5 Standards - given the variety of types of services and range of job roles
across the organisation, one size will not fit all and it is important to be able to
support many flexible working arrangements that result in more efficient and
effective service delivery. However, having said that, from an organisational
perspective, there is a need to set some standards in order to inform property,
technology and equipment requirements: 
(a) Property/Space requirements – a general rule of thumb would be based
on an initial minimum standard of 50% desk allowance for teams.  This
has been calculated based on the previous ratio of 70% and physical
observation of the current occupancy rates within the HQ campus which
demonstrated capacity for further reduction. It would be possible to be
more prescriptive per work style, however it is considered that the wide
variation of operational service delivery requirements across the
organisation would be best managed using the 50% ratio. 
(b) Technology and Equipment requirements – suitable technology and
equipment will be provided as appropriate to the workstyle enabling the
performance of the full range of duties and responsibilities of the post. 
The baseline of technical equipment for flexible workers is a laptop,
keyboard and mouse with headphones available if required.   Each desk
Page 86

Page 87

for a flexible worker is equipped with a docking station, monitor and those
working flexibly are able to request a monitor for their home work station. 
4.6 Support – as well as revising the flexible working policy, the flexible working
toolkit has been revised and hybrid working guidance developed.  Training for
managers and employees on a range of elements is being developed e.g.
outcome based performance management, hybrid meetings, use of
technology. 
4.7 Contractual Issues – the changes to ways of working have raised questions
around whether or not contractual changes are required when considering
making these changes a permanent feature going forward, rather than an
interim solution to a particular issue when responding to the pandemic
situation.   
(a) Administrative/Work Base - this is specifically in relation to the requirement
to state a contractual location (i.e. the places or addresses where the
employee or worker will work) within employment written statement of
particulars.  This does not necessarily change as a result of hybrid
working, although employees who work permanently from home normally
have their home address as their workplace.  HMRC guidance for hybrid
workers who attend the office is that the office remains their permanent
workplace and therefore their administrative base. 
(b) Implications for Travel Claims – place of work is an important factor in
mileage claims.  It is clear that for a ‘Fixed’ worker, the administrative base
for any relevant claims will be as stated in the written statement of
particulars which may state a particular office base or may refer to the
town within which the office base is.   It is also clear that for a ‘Home’
worker, the administrative base for any relevant claims will be as stated in
the written statement of particulars which should state the home address
of the employee.  Any travel required to other locations required in order to
fulfil the functions of the job role would be calculated from this base, with
the exception of the agreed travel required to attend the office, as this is
part of the overall agreement and expectations with regard to home
working.  For ‘Hybrid’ workers the existing flexible working policy has been
amended in line with HMRC guidance by linking the administrative base to
the agreed arrangements for hybrid working.   This means hybrid workers
are reimbursed for costs arising from essential business travel that is
greater than their normal office commute distance.   
4.8 It is proposed that the Council implement hybrid working arrangements via the
Flexible Working Policy agreed on a formal basis through a collective
agreement with the recognised negotiating Trades Unions, with the particular
arrangements for individuals being agreed between employee and manager
(informally); the need to change employment contracts would then be based
on whether or not there are formal requests for flexible working which would
only be needed where there is not an agreement between employee and
managers as to what is possible.  The informal arrangements agreed between
employee and manager could be written down but would not form part of the
written statement of particulars. 
Page 87

Page 88

4.9  This approach ensures the formal adoption of a flexible working policy that
references hybrid working arrangements which are incorporated into contracts
of employment, yet provides the flexibility for services and employees to agree
mutually acceptable working patterns without the need to generate updated
written statements of particulars and which in many cases will simply be
confirming the arrangements that have been in place for the last two and a
half years.   Contractual rights over time (through custom and practice) in
relation to hybrid working has yet to be determined in terms of case law and
this will be monitored for any implications that may require further
consideration of this approach.  
4.10 Communication and Engagement – implementation of the flexible working
policy entails consolidation of a significant change to ways of working across
the organisation with regards to adopting hybrid working as a permanent
feature and expectation for a large number of people.  While managers and
employees responded well to the enforced remote working that was thrust
upon them due to government and public health requirements, moving to
hybrid working and the mix of home and office working that entails, is another
shift in terms of how people manage the mix of what was previously two
distinct approaches.   Formal consultation with the recognised Trades Unions
is noted in section 5(i) below, as is the engagement undertaken to date with
service managers.  Further communication and engagement with managers
and staff will form a key part of the ”Smarter Working” project. 
4.11    Behaviour and culture change can be challenging to achieve long term and
the chances of achieving this are maximised if an organisational development
approach is adopted.   Communication and engagement are fundamental to
this approach and there will be specific reference to this within the detailed
business case which will be undertaken jointly with Property Services and in
parallel to the implementation of the office review with future joint reporting
under the banner of “Smarter Working”. 
4.12 Telephony – an intrinsic part of the hybrid working approach is ensuring that
people know how to contact officers, regardless of where they happen to be
working on any given day.   A review of the telephony infrastructure will be
part of the work required going forward. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This project forms part of the Improvement and Modernisation
Programme (IMP) that supports the Council priority of creating a
sustainable council providing valued services to the community and
developing and realigning the workforce to meet future requirements. 
(b) Policy and Legal
The Flexible Working Policy has been updated to include reference to
hybrid working arrangements and will be formally agreed with the
recognised Trades Unions.    The policy is designed to facilitate
managers and employees within services agreeing ways and patterns of
working that are mutually acceptable on an informal basis, whilst
Page 88

Page 89

employees can still revert to a formal flexible working request when
required.   Should there be a situation where the employee and manager
cannot agree working arrangements, they should refer to Human
Resources for advice as imposing a change to informal arrangements
related to terms and conditions of employment could risk Employment
Tribunal claims of breach of trust and confidence and/or discrimination.  
The case law on hybrid working is still developing and this will be
monitored for decisions that may have an implication for the Council’s
approach. 
(c) Financial implications
The financial implications from moving to hybrid working as a substantive
arrangement are not yet entirely clear.    There are potential financial
implications arising from ensuring the home work environment for hybrid
and home workers is safe and fit for purpose.    Following assessment
and discussion with line managers, there may be residual requirements
for equipment and furniture and this has will be met by the office furniture
budget in the first instance with further costs being considered through
either a capital budget monitoring report or a report to the Asset
Management Working Group depending on the scale of spend sought. 
A key aim of the “Smarter Working” project is to rationalise the office
estate which is anticipated to generate savings.   This is referred to in
more detail in the Office Review Update report which is on the agenda
for this Committee. 
(d) Risk Implications
There are a number of risks associated with the implementation of the
”Smarter Working” project: 
Cost of living increases – the increasing costs of living may impact on
the number of employees who choose to work more often from the office
in order to reduce their heating overheads albeit this would have to be
balanced against the costs of their daily commute.   This is likely to have
different implications depending on individual circumstances and to be a
personal decision regarding the competing costs and savings of heating
their home versus travelling in to work.   Managers will be required to
have discussions with their teams to identify the different requirements
and balance those against the business needs and available space in
the office as part of the process of preparing for consolidating the current
network of arrangements that have been in place for approximately 2 ½
years and employees will be encouraged to make choices as part of that
work. 
Informal transfer of knowledge and experience with hybrid working
requires to be managed more explicitly as the opportunities for implicit
informal learning from observing and being near colleagues is reduced. 
Consistent, fair and equal opportunity for all employees is fundamental to
fair work practices and managers will be trained and supported to ensure
that they are aware of the potential pitfalls arising from inconsistencies in
this regard.
Page 89

Page 90

The Council demographic is that approximately 75% of the workforce are
in the lower grades of the organisational structure which raises potential
socio-economic risks.  These are noted below. 
(e) Staffing Implications
The impact of the COVID-19 pandemic has had far reaching
consequences on the workforce and ways of working.    While the
Council is aiming to consolidate gains that have been made during the
pandemic in terms of increased flexible and hybrid working, there is a
risk that some staff will be unable or unwilling to accommodate working
from home as a permanent feature of their employment.    While every
attempt will be made to lay strong foundations for this permanent change
in approach by the Council in terms of preparation of buildings,
infrastructure, training and development for managers and staff, survey
results indicate that there is likely to be a proportion of staff who will want
or need to work fully from an office location, and a similar number who
will want to work fully from home.   Managers will be supported to
engage positively with all staff to work through issues and considerations
before final decisions are made within services. 
Staffing implications arising from the Workplace of the Future project will
also entail consultation and engagement with the recognised Trades
Unions as per agreed Council policy and protocols as well as discussion
and agreement between managers and employees as described in
section 4.10 of the report. 
(f) Property
As set out in the report and the Office Review report. 
(g) Equalities/Socio Economic Impact
While the approach to flexible working within the Flexible Working Policy
has been expanded to include consideration of flexibilities for services
that might previously not have naturally provided much scope due to the
nature and demands of the service, there are potential equalities and
socio-economic impacts arising from increased volumes of hybrid
working which should be considered.   An Equality Impact Assessment is
part of the Outline Business Case for the Workplace of the Future project
and an updated Equality Impact Assessment for Flexible Working will be
undertaken as part of the implementation process in order that any
undue impact is identified and mitigated appropriately. 
(h) Climate Change and Biodiversity Impacts
The proposals for the Flexible Working Policy in this report help the
climate change agenda as an enabler for the office rationalisation project
leading to reduced carbon footprint for the Council.  This is likely
however to be offset to a degree by an increased number of people
working from home.  A standard figure calculating average carbon
footprint for homeworking has been sourced by the Climate Change
team which will help inform the overall impact of the “Smarter Working”
project. 
Page 90

Page 91

(i) Consultations
Consultation has been undertaken with recognised Trades Unions
representatives through the agreed mechanism of the Policy Forum
when the initial high level overview of the Flexible Working Policy was
completed in January 2022. Whilst generally supportive of the proposed
approach and changes suggested, further detail around the supporting
documentation was being sought and the view was that the Policy could
not be progressed without the details that would sit behind that in terms
of supporting documentation, e.g. Flexible Working Toolkit and Hybrid
Working Guidance.   Further consultation with the recognised Trades
Unions has taken place with feedback constituting mostly queries and
clarifications on the implementation of the policy.   However, advice is
being sought from national TU colleagues regarding travel claims with no
response received on this point as yet.  The Council’s approach is not
out of step with a variety of approaches being taken across other Local
Authorities in Scotland.
Once the proposals for change outlined in the various documents have
been approved, further discussions will be required with managers and
TU representatives. This will be through existing fora.
Following on from a discussion at the Personnel Forum (senior manager
group) in November 2021, a workshop was held with Personnel Forum
managers (31 March 2022) which has further informed the work on the
Policy and the development of the Hybrid Working Guidance. In addition,
the draft documents have been subject to consultation with officer
groups. 
6. CONCLUSION 
6.1 This report provides an update on the review of the Flexible Working
Policy and the joint project with Property Services to deliver the
“Smarter Working” project. 
Author of Report: Frances Garrow, Head of HR, ICT & OD
Background Papers: Flexible Working Toolkit 
Hybrid Working Guidance 
Checklist for Hybrid Working 
Tools for Remote Working 
Display Screen Equipment (DSE) Checklist 
Your Health and Working From Home 
Working Arrangements Information 
Flexible Working Application Form 
Windows 10 – Anytime Connect User Guide 
Ref: SPMAN-1656699058-83 
Page 91

Page 92

Page 92

Page 93

APPENDIX 1 
MORAY COUNCIL
Flexible Working Policy 
Introduction
Moray Council believe that its employees are its most valuable asset and are committed to
attracting and retaining the very best.  It recognises the importance of supporting employees
to balance their work and home life by offering flexible working and the benefits that can be
realised by developing the post pandemic working environment, in particular by setting out the
Council’s approach to hybrid working. The Council is also committed to reducing it’s carbon
footprint and the reliance on Council buildings and facilities. 
This enabling employment policy is focussed on achieving the benefits of flexible working for
the organisation and employees by providing a firm foundation for efficient delivery of services,
ensuring continuous improvement in service provision with a focus on excellent customer
service and where flexible working requests are made, that the needs of the service and the
requirements of the job are paramount. 
Providing seamless access to the workplace that meets customer, staff, service and
organisational needs will support the Council as an exemplar for providing effective and
efficient modern office and functional spaces, delivering quality services and helping reduce
the Council’s carbon footprint. 
With the increased prevalence of working from home and expectations around hybrid working,
it is anticipated that the need for individual applications will reduce.
Policy Statement
The Moray Council will encourage and support flexible working by proactively
considering its application to all Council jobs. Wherever possible, we will offer defined
flexible working arrangements designed to support service needs and offer choices to
employees which assist work-life balance.
Aims:
• promote flexible working to support effective service delivery and efficiencies within the
Council;
• enhance the working experience for employees by offering flexible working arrangements
which support work–life balance;
• provide a planned approach which creates a strong framework to balance service
requirements and individual preferences while maximising service delivery for the
customer.
• Utilise flexible working as a tool to ensure efficient use of council buildings and
facilities.
• Embed hybrid working for employees normally in an office environment, based on the
agreed 2 day office/3 day home working model or versions of such that equate to a
proportionate arrangement taking account of service delivery requirements and
individual circumstances.
Item 11.
Page 93

Page 94

• Work towards maximising the opportunities for flexibility in site specific/defined hours
roles.
• Maximise technology to enhance flexible working e.g. increased use of collaborative
tools, hybrid working solution for meetings. 
Scope/Eligibility
The policy applies to Local Government Employees, Craft Operatives and Chief Officers.
Teaching staff should refer to the SNCT website for further details.  
All employees can ask to be considered for flexible working, however, the following
considerations will apply:
• Repeat requests: These will not normally be considered within 12 months of the date of a
previous application to work flexibly, except in exceptional circumstances.
• Posts which are site specific and/or where defined hours are required: Whilst it may not be
possible for flexible working arrangements to apply to these posts, nevertheless opportunities
for some measure of flexibility (e.g. to attend to personal business/appointments) will be
considered and applied where appropriate. The rationale as to why flexible working
arrangements are not possible will be available for employees upon request from their line
manager.
Flexible Working in Moray
The main change in the flexible working offer is the introduction of hybrid working allowing
employees to split their time between attending the office/workplace and working remotely,
usually from home. This adds to the existing variety of flexible working arrangements available,
all of which align with the principles outlined by the Health and Safety Executive around stress
at work and the Fair Work Framework.
Although the Council is committed to providing as wide  a range of flexible working
arrangements as possible for its employees, both management and employees need to be
realistic and recognise that the full range of flexible working arrangements will not be
appropriate for all jobs across all services.
However, the Council is committed to working towards maximising the opportunities for
flexibility in site specific/defined hours roles where possible. For example, it may be that
through team rostering and/or re-arrangement of tasks and duties across teams, some
elements of flexibility may be able to be accommodated where it is not possible to consider a
change in workstyle for the job role itself.
The agreed model of hybrid working will continue for office based employees, which is based
on a standard model of 2 day office/3 day home working (or versions of such) for full time
employees, adapted as appropriate to working hours and individual circumstances.
Managers are responsible for identifying the adaptations that are required to enable and
facilitate service delivery requirements. 
Page 94

Page 95

Workstyles: 
Location Based/Fixed: any job which requires to be carried out at a particular location, e.g.
service users home, facilities such as swimming pools, schools, libraries. 
Hybrid: any job which can be carried out by splitting time between the workplace, usually an
office, and home. (hybrid working guidance) – Background Paper 2 
Home: any job which can be carried out wholly or mainly at home, or out in the field, with
minimal requirement to attend an office or other work based location. 
Managers are responsible for allocating a particular workstyle to all job roles within their
service area based on consideration of where and when work can be carried out. 
Parameters for Flexibility: 
Managers are responsible for defining the parameters for flexibility with their service area to
facilitate and enable employees to achieve a positive work/life balance whilst ensuring that
service provision is not compromised. 
The types of arrangements that may be considered include: 
Flexibility in Hours of Work:  Flexi Time; Compressed Hours; Annualised Hours; Staggered
Hours 
Flexibility in Leave arrangements: Structured Time off In Lieu; Holiday Buy Back 
Flexibility in Contractual arrangements: Job Share, Part Time, Term Time; Phased
Retirement 
Management Arrangements 
Guidance is available to support managers to put in place the required management
arrangements for the types of flexible working arrangements that are appropriate within their
service areas. The Flexible Working Toolkit and home/hybrid working guidance provide
information, guidance and further details of how the range of flexible working arrangements
can be implemented in practice. 
It is recognised that there needs to be an increasing focus on outcomes based management
rather than the time that employees spend at or in work and revised parameters are necessary
to ensure the appropriate level of support and clarity of expectation around the way work is
managed given the increase in working from home.
The Council is committed to supporting positive mental health and wellbeing across the
workforce and will ensure that this is a central feature of the arrangements for managing
flexible working.
Temporary Change
From time to time employee’s circumstances change, perhaps they may have developed
caring responsibilities for a short period of time. Flexible working can support this, through a
Page 95

Page 96

temporary change in working arrangements, allowing employees to revert back to their
previous working arrangements after a specified period. 
Informal arrangements can be made within the service between the manager and employee,
ensuring that a service impact assessment is undertaken to gauge whether the temporary
change in working arrangements can be accommodated. 
Possible arrangements may include:
• Starting 1 hour later each morning to help settle children into a new school, making
up the time at the end of the day
• Taking an afternoon off to attend a hospital appointment and agreeing to work the
hours back the following week
• Starting 1 hour earlier each morning to allow for longer lunch breaks to be taken to
help prepare a meal for an elderly parent following an operation
If the informal arrangement is likely to exceed 3 months, a formal application and agreement
must be made. If the request to change working arrangements is then approved, it will result
in a permanent change to the employee’s contract.
Equality
Employees will not be treated less favourably as a result of working flexibly, or having made
a request to do so. Where changes are approved, the general terms and conditions of
employment for flexible workers will be the same as for all other council employees.
However, there will be particular areas where conditions will have to be specified, for
example in relation to health and safety and security of information for homeworking. These
are detailed under the Flexible Working Toolkit (Background Paper 1) under general
principles and in the home/hybrid working guidance.
Application procedure
It is anticipated that the number of individual flexible working requests will reduce given the
increased opportunity for flexible working, particularly hybrid working, to be identified and
implemented within services.
Where employees would like to work outwith either the standard model of hybrid working
(2/3day split) or the model as adapted by their service area, a flexible working request will be
required.
Requests for flexible working should be made using the Flexible Working Application Form 
(Background Paper 8) and then passed to the line manager for consideration. 
All statutory requirements are reflected in the process outlined and at all stages of the
process, trade union representatives are available, as appropriate, to provide advice and
guidance to their members.
Responding to an application
Once a request has been received the line manager will acknowledge receipt of the
application as soon as possible. The application will then be discussed with HR. It may be
that a meeting is required to discuss the application further, and if this is the case the
Page 96

Page 97

employee will be notified accordingly. The meeting provides an opportunity for the reasons
behind the request to be explored and ensure that it is the best option for both the service
and employee. However, if a meeting is not necessary, a desktop assessment of the
application will be undertaken and the employee  will be notified of the outcome. 
The request may be approved in full, in part or refused. If it is refused, it must be due to one
of the following business reasons:  
• imposes an unreasonable burden of additional costs on Moray Council;
• has a detrimental effect on the Council’s ability to meet its customers' demands;
• has a detrimental impact on quality;
• has a detrimental impact on performance;
• creates unacceptable difficulties for the Council as we have been unable to make
arrangements to reorganise the work amongst other employees;
• creates unacceptable difficulties for the Council as we would be/have been unable to
recruit additional staff; 
• creates unacceptable difficulties for the Council due to insufficient work being available
during the periods you propose to work;
• it is inappropriate due to planned structural changes. 
In terms of timescales, a response (Flexible Working Outcome Letter) should usually be
provided within 28 days of the application being received by the line manager. If further
considerations or arrangements need to take place, for example the availability of
technology or a further assessment on the suitability of the request, then a response can
take up to 8 weeks.
Any request that is accepted will be a permanent change to the employee’s contract. To
ensure that the change is suited to both the employee and the service, the line manager may
introduce a short trial period (e.g. between 1-3 months) initially before formally responding to
the request. 
Appeal procedure
If the application is refused the employee has the opportunity to discuss it further with the
next level of management to explore resolution. If attempts to resolve are unsuccessful, an
appeal may be raised by completing an Appeal Request within 14 days of receiving written
notice that the application for flexible working was turned down and submitting it to the
manager detailed on the outcome letter. 
All requests, including any appeals must be considered and decided on within a period of
three months from the line manager receiving the request, unless an extension period has
been agreed with the employee. The outcome of the appeal will be determined in
consultation with HR and notified to the employee formally in writing. 
Terms and Conditions
Page 97

Page 98

When a new designated way of working is agreed, any changes to the terms and conditions
will be formally notified to the employee. Examples of this would be a change in hours or
salary.
There will also be particular areas where conditions will have to be specified, for example in
relation to health and safety for homeworking and security of information. These are set out
under the Flexible Working Toolkit and home/hybrid working guidance (Background Paper 2)
which may be supplemented to suit individual working requirements. All terms and
conditions must be agreed in advance to allow flexible working to take place.
Related Documents
Document Purpose
Flexible Working Application Form
(Background Paper 8)
This can be used to make an application to work
flexibly, or change your current working pattern. 
Flexible Working Meeting Request
Letter 
This template can be used to invite an employee
to a meeting to discuss their flexible working
request further. 
Flexible Working Outcome Letter  This template can be used to advise the
employee of the outcome of their flexible working
request.
Flexible Working Appeal Request  This template can be used by employees to raise
an appeal on the outcome of their flexible
working request.
Flexible Working Toolkit
(Background Paper 1)
This toolkit provides support and guidance on the
practical use of the council’s flexible working
policy and should be read in conjunction. 
Page 98

Page 99

REPORT TO: MORAY COUNCIL ON 28 SEPTEMBER 2022 
SUBJECT: MORAY LEARNING ESTATE STRATEGY 2022-2032 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 The report introduces a ten year Moray Learning Estate Strategy in
accordance with Scotland’s Learning Estates Strategy “Connecting People,
Places and Learning”. 
1.2 This report is submitted to the Council in terms of Section III (D) (1) of the
Council's Scheme of Administration relating to all the functions of the Council
as Education Authority. 
2. RECOMMENDATION 
2.1 It is recommended that the Council consider and approve the Moray
Learning Estate Strategy 2022-2032. 
3. BACKGROUND 
3.1 A draft document setting out proposals for developing a strategic approach to
the learning estate in Moray was presented to a special meeting of Moray
Council on 9 October 2020. Members were updated on the planned
reactivation of engagement work relating to the learning estate and it was
agreed that the outcomes of initial engagement on the proposed strategic
approach should be brought back to Council by the end of the year
(paragraph 4 of the Minute refers). 
3.2  Following engagement on the proposed strategic approach a further report to
Moray Council on 16 December 2020 provided Members with information
regarding the outcomes of engagement, with stakeholders indicating broad
support for the approach with a particular focus on: 
• Ensuring our learning environments support the wellbeing of all
learners (and staff and community), and meet all needs to support
inclusion/accessibility
• Ensuring our learning estate is well managed and maintained in a good
condition
• Ensuring all our schools are equipped with the best digital technology.
Item 12.
Page 99

Page 100

The Council approved the ‘Developing a Strategic Approach to the Learning
Estate’ document (para 5 of the minute refers). 
3.3     The Learning Estate Strategy 2022 to 2032 takes account of the ‘Developing a
Strategic Approach to the Learning Estate’ document, and of current and
developing priorities, including the Climate Change targets, and sets out how
the new Learning Estate Team will manage investment in our learning estate
over the next 10 years to support the achievement of Excellence and Equity
for our children and young people. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Learning Estate Strategy will support the delivery of the LOIP
outcome of building a better future for our children and young people in
Moray and growing a diverse and sustainable economy, and will
advance the Corporate Plan priority of reviewing and transforming the
learning environment. 
(b) Policy and Legal
The Schools (Consultation) (Scotland) Act 2010 sets out the legal
requirements for consultation on relevant proposals affecting individual
schools. Consultation activity focussing on options within Associated
School Groups and for individual schools will follow the legal
requirements as set out in the above Act. 
(c) Financial implications
There are no financial implications arising directly from this report. The
Learning Estate Strategy will support a planned and prioritised approach
to investment in our learning estate, and a realistic assessment of the
costs of meeting the objectives set out in the national learning estate
strategy. 
(d) Risk Implications
There are significant risks with a programme of this scale and nature and
these will be considered in detail as the Associated School Group (ASG)
level investment plans and individual project business cases are
developed. 
The development of investment plans for our learning estate is likely to
generate a high degree of public interest and speculation about the
future of individual schools. It is important that there is a commitment to
take this work forward in a planned way and in recognition of the difficult
public relations aspects that may arise as a result.  
Page 100

Page 101

(e) Staffing Implications
There no staffing implications arising directly from this report at this
stage. Future reports will provide staffing implications updates as
appropriate. 
(f) Property
The Learning Estate Strategy sets out how the Learning Estate Team in
the Education Resources and Communities Service, and the Property
Service will work together to develop Asset Management and
Preventative Maintenance Plans that take account of long-term
investment plans for the learning estate within each ASG. 
(g) Equalities/Socio Economic Impact
The quality of the learning environment can impact on learning and
attainment by as much as 16%. The condition and suitability of our
learning estate and capacity challenges associated with both growth and
population decline in some areas give rise to unequal opportunity across
Moray. 
The Learning Estate Strategy seeks to address this by setting out a
vision that all Learning Estate buildings in Moray meet minimum
standards and are fit for purpose. 
Equality impact assessments will be carried out as appropriate during
the implementation of the strategy in order to ensure that the benefits are
distributed fairly and impacts on groups protected under the Equality Act
2010 are identified and, where reasonably possible, mitigated. 
(h) Climate Change and Biodiversity Impacts
The Learning Estate Strategy highlights the net zero targets as a key
factor in the development of ASG level investment plans and individual
project business cases. 
(i) Consultations
The Head of Education (Chief Education Officer), Head of Environmental
and Commercial Services, Head of Housing and Property, Head of
Development Services, Tracey Sutherland, Committee Services Officer,
Paul Connor, Principal Accountant, Human Resources Manager,  Equal
Opportunities Officer, members of the Learning Estate Programme
Board and members of the Asset Management Working Group have
been consulted and the comments received have been incorporated into
the report. 
5. CONCLUSION 
5.1 The Learning Estate Strategy sets out how the Learning Estate Team will
work with teams across the Council to support a planned and prioritised
approach to investment in the Council’s learning estate. Learning Estate
Strategy update reports will be brought to Committee for consideration
on an annual basis. 
Page 101

Page 102

Author of Report: Joanna Shirriffs, Head of Education Resources &
Communities
Background Papers:
Ref: SPMAN-9425411-43 
SPMAN-9425411-44    
Page 102

Page 103

Learning Estate Strategy 2022-2032 
05 September 2022 
Item 12.
Page 103

Page 104

1 
Table of Contents
1. Foreword ................................................................................................................................................... 2
2. National Outcomes .................................................................................................................................... 3
3. Moray Learning Estate Strategic Aspirations and Key Drivers .................................................................. 4
4. Moray Council Position .............................................................................................................................. 5
4.1 The Moray Learning Estate ...................................................................................................................... 5
4.2 The Moray Approach to Planning ............................................................................................................ 5
4.3 Community Engagement ......................................................................................................................... 7
4.4 Statutory Consultation ............................................................................................................................ 7
4.4.1 Schools (Consultation) (Scotland) Act 2010 ..................................................................................... 7
4.5 Managing the Learning Estate ................................................................................................................. 8
4.5.1 The Learning Estate Team ................................................................................................................ 8
4.5.2 Learning Estate Programme Governance ......................................................................................... 8
4.5.3 Reporting to Committee ................................................................................................................... 9
4.5.4 Investment in our learning estate .................................................................................................... 9
4.6  Learning Estate Programme High Level Plan (August 2022) .................................................................. 1 
Page 104

Page 105

2 
1. Foreword 
In March 2020 Moray Council agreed the Developing a Strategic Approach to the Learning
Estate paper, which set out the steps we needed to take to develop a long-term strategy
for our learning estate. This included the creation of a Learning Estates Team within the
Education Resources & Communities Service. This strategy document follows on from the
above document and sets out how Moray Council will work over the next 10 years to
optimise its investment of resources in its Learning Estate in a prioritised manner to meet
the needs of 21st century learning and teaching.
The Moray Council Learning Estate Strategy will support the overall vision and priorities
within the National Improvement Framework (NIF) with a focus on excellence and equity
for all our children and young people.
The Learning Estate Strategy also aligns with the local priorities set out within the Local
Outcome Improvement Plan (LOIP) and the Moray Council Corporate Plan, with the
Council’s vision for developing its learning estate summarised as delivery of a 
‘Learning Estate that is flexible and inspirational, that supports excellence and
equity for all in Moray, building a better future for our children and young people,
providing life-long learning opportunities and providing the foundations for a growing
and diverse sustainable economy’.  
Page 105

Page 106

3 
2. National Outcomes 
Scotland’s Learning Estate Strategy: Connecting People, Places and Learning 
The Scottish Government and COSLA have shown their commitment to invest in the
learning estate through their strategy “Scotland’s Learning Estate Strategy: Connecting
People, Places and Learning”. 
This national strategy recognises the importance of the learning estate in supporting
outcomes that are necessary for a more successful Scotland. This vision is for: “A
learning estate which supports excellence and equity for all”
The National Learning Estate Strategy is aligned to the education policy aims, set out in
the National Improvement Framework (NIF) of achieving excellence and equity for all
children and young people and closing the poverty related attainment gap. 
The strategy details the specific national outcomes to which it primarily relates: 
• We grow up loved, safe and respected; 
• We are well educated, skilled and able to contribute to society; 
• We are healthy and active; 
• We live in communities that are inclusive, empowered resilient and safe; 
• We have thriving and innovative businesses with quality jobs and fair work for   
everyone; and
• We have a globally competitive, entrepreneurial, inclusive and sustainable
economy 
Our learning estate should support the three key national education and skills priorities: 
• Getting it right for every child (GIRFEC) 
• Curriculum for Excellence 
• Developing the Young Workforce (DYW) 
The National Strategy sets out ten guiding principles as follows:
• Learning environments should support and facilitate excellent joined up learning
and teaching to meet the needs of all learners; 
• Learning environments should support the wellbeing of all learners, meet varying
needs to support inclusion and support transitions for all learners; 
• The learning estate should be well-managed and maintained, making the best of
existing resources, maximising occupancy and representing and delivering best
value;
Page 106

Page 107

4 
• The condition and suitability of learning environments should support and enhance
their function; 
• Learning environments should serve the wider community and where appropriate
be integrated with the delivery of other public services in line with the place
principle; 
• Learning environments should be greener, more sustainable, allow safe and
accessible routes and be digitally enabled; 
• Outdoor learning and the use of outdoor learning environments should be
maximised; 
• Good consultation about learning environments, direct engagement with learners
and communities about their needs and experiences, and an involvement in
decision making processes should lead to better outcomes for all; 
• Collaboration across the learning estate, and collaboration with partners in
localities, should support maximising its full potential; and 
• Investment in Moray’s learning estate should contribute towards improving learning
outcomes and support sustainable and inclusive economic growth. 
3. Moray Learning Estate Strategic Aspirations and Key Drivers 
The National Guiding Principles form the basis of the Moray Council Learning Estate
Strategy and approach. 
Within Moray the learning estate strategic aspirations and key drivers are:
Excellence
• All learners to be educated in high quality buildings (aiming for minimum level B for
condition and suitability).
• All learners to have access to high quality outdoor learning environments.
Inclusion
• The learning estate must be accessible to all.
• The learning estate must support achievement for all, including non traditional
learner pathways.
• The learning estate should support the health and wellbeing of all users.
Place
• Our learning estate should be for the local community, with flexible and extended
use outside of normal nursery/school operating hours.
Page 107

Page 108

5 
• Shared use of buildings to be explored with partners to enhance and enable
effective delivery of services within our communities.
Sustainability
• We will aim for school occupancy levels of at least 80% of functional capacity.
• The learning estate must meet national and local net zero carbon targets.
• The learning estate must be able to support high quality digitally enabled learning
and community access to digital.
• We must achieve and evidence best value from our investments. 
4. Moray Council Position 
4.1 The Moray Learning Estate 
As of Apr 2022, the Learning Estate in Moray consists of: 
8 Secondary Schools
46 Primary Schools
17       Additional Support Needs Enhanced Provisions within Secondary and           
Primary Schools
29  Early Learning and Childcare Centres co-located with Primary Schools
6 Standalone Early Learning and Childcare Centres 
4.2 The Moray Approach to Planning 
When considering the management of, and investment, in our learning estate we will take
account of the following factors:
• Pre-School/School roll trends and projections (reviewed every 6 months)
o Analysis of out of zone placement request patterns
o Sensitivity analysis on longer-term projections 
• Additional Support Needs (ASN) requirements, including future projections of need
and building accessibility. 
• Early Learning Centre/School/Enhanced Provision capacities
o Primary school capacities are determined according to the Scottish
Government’s 2014 guidance paper ‘Determining Primary School Capacity’
o There is no equivalent guidance for secondary schools. The Learning Estate
Team, in collaboration with Northern Alliance and national partners, will
adopt or develop updated guidance to inform future capacity calculations for
our secondary schools.
o Early Learning Centre capacities are determined according to the Scottish
Government’s 2017 publication ‘Space to Grow’.
Page 108

Page 109

6 
o There is no national guidance for Enhanced Provision capacities for children
and young people with additional support needs (ASN). The Learning Estate
Team will work with the Moray Council ASN teams to develop agreed
capacities to better inform investment planning. 
• Building Condition (building fabric, safety and security)
o Full condition surveys in line with the Scottish Government Core Facts
assessments, with regular interim building inspections.
o Analysis of ongoing maintenance costs to support the achievement of
minimum B/B standard for condition and suitability as defined by the Scottish
Core Facts guidance. 
• Building Suitablity (how the internal space and layout supports learning and
teaching).
o Assessment of long-term viability of the building to support the achievement
of equity and excellence. 
• Educational Factors
o Opportunities to deliver a modern/flexible curriculum
o Opportunities for pupil choice and flexibility
o Opportunities to deliver digital enabled learning
o Opportunities to offer high quality outdoor learning
o Quality assurance data, including attainment levels 
• Community Benefit Factors
o Opportunities to support community access and lifelong learning 
• Partnership Opportunities
o Opportunities to align building investment across local public service
providers to improve service delivery within our local communities through a
place-based approach.
o Opportunities to consider new points of delivery for third sector and private
partners, providing revenue generation possibilities for the Council. 
• Net Zero Carbon targets
o  Moray Council to become carbon neutral by 2030
o Scotland to achieve net-zero greenhouse gas emissions by 2045. 
Learning Estate assessments will take account of the national guiding principles, the
Moray aspirations and key drivers, and the above factors and will consider how best to
achieve the Learning Estate Strategy aims with the funding available to us.
Assessments may result in one of the following recommendations:
1. No action 
2. Action to manage capacity (e.g. restriction on placing requests)
3. Prioritisation for investment, which could include:
a. Preventative Maintenance Project
Page 109

Page 110

7 
b. Refurbishment Project
c. Extension to the building
d. New Build
When undertaking assessments of our learning estate we will also consider the long-term
sustainability of our buildings, including the budget required to develop our learning estate
to the required standard . Where there are concerns regarding sustainability, and the long-
term affordability of the learning estate programme, recommendations may include one of
more of the following:
1. Use of building (or part of the building) for another purpose (e.g. to generate income
through the lease of the building to a partner organisation).
2. Rezoning 
3. Mothballing
4. Merger of schools
5. Closure
All the above potential recommendations would require extensive engagement under
statutory consultation processes. 
4.3 Community Engagement 
We are committed to working closely with our local communities to establish our priorities
for investment in our learning estate. We will also engage with all relevant stakeholder
groups, including school staff, children and young people, parents and service partners to
ensure all views are considered.
We will complete a comprehensive review of each Associated School Group (ASG), taking
account of all of the learning estate assessments and recommendations relating to each
early learning & childcare setting and school within the ASG. We will work together with
our communities and stakeholders to agree an approach to future investment within the
ASG area, agreeing actions that will enable us to work towards meeting the learning estate
strategy aims across a sustainable learning estate, within a suitable timeframe, and within
the budget available to us. 
4.4 Statutory Consultation 
4.4.1 Schools (Consultation) (Scotland) Act 2010 
Any proposed changes to the learning estate will need to take account of statutory
consultation requirements. The Schools (Consultation) (Scotland) Act 2010 establishes a
consultation process in respect of school closures and other major changes that affect
schools.
The Guidance for School Consultation sets out the consultation requirements, which
includes the demonstration of educational benefit of any proposal. The 2010 Act also
makes special arrangements in regard to rural schools, establishing a procedural
presumption against the closure of rural schools. 
Page 110

Page 111

8 
In considering alternatives to closure local authorities may choose to consider
“mothballing” a school (or a stage of education). This is a temporary closure which does
not require consultation under the 2010 Act. A Moray mothballing policy will be agreed to
support operational and strategic decision-making. Following mothballing a school, or
stage of education, may reopen due to an increase in pupil numbers, or a decision may be
taken to move to statutory consultation on permanent closure. 
4.5 Managing the Learning Estate 
4.5.1 The Learning Estate Team
The Learning Estate Team was established in April 2021. The team comprises of: 
• Programme Manager
• Senior Project Managers
• Communications Officer support (officer located within the Communications
Team)
• Community Support Officer support (officer located within the Communities
Team) 
The main remit of the team is: 
• Appraising the learning estate in line with the national and local learning estate
strategy.
• Leading on the development of prioritised investment plans to enhance and develop
the Learning Estate in line with the learning estate strategy principles and key
drivers, within available budgets.
• Project management of agreed learning estate projects.
• Collaboration with the Planning Service to understand Housing Land Audit trends
and to ensure current and future Local Development Plans take into account
available school capacity and the ability to adapt the estate. Supporting Planning
colleagues to secure appropriate Developer Obligation Contributions.
• Collaborating with the Property Service to ensure property led Asset Management
and Preventative Maintenance plans take account of long-term investment plans for
the learning estate within each ASG.
• Liaising with Environmental & Commercial Services regarding School Catering and
Transport requirements.
• Keeping abreast of best practice in relation to all aspects of the learning estate, and
incorporating learning into all projects and practices.
• Developing and maintaining a standardised brief for early learning & childcare,
primary, secondary and additional support needs enhanced provision buildings in
line with best practice and to support the achievement of best value.
4.5.2 Learning Estate Programme Governance 
The Learning Estate Programme Board is led by the Depute Chief Executive (Education,
Communities & Organisational Development) and includes Heads of Service for: Property
Page 111

Page 112

9 
and Housing, Head of Economic Growth and Development, Head of Environmental &
Commercial Services, Head of Financial Services (S95 officer), Head of Education, Head
of Education Resources & Communities, Head of HR, ICT and Organisational
Development; and Head of Governance, Strategic Planning and Performance. The Board
meets quarterly and maintains an oversight of the delivery of the Learning Estate Strategy
and associated learning estate investment plans. 
Investment proposals agreed by the Programme Board will be submitted to the Asset
Management Working Group for consideration alongside the corporate review of planned
Capital Plan spend.
Each investment project will have its own Project Board led by the Head of Education
Resources & Communities.
The Learning Estate Team and Property Asset Management Team will meet on a monthly
basis, working in partnership to deliver projects under preventative maintenance planning,
in line with agreed Learning Estate Investment Plans. Any investment in the learning
estate should be targeted according to the factors set out in this strategy, to maintain our
buildings at the required standard and to minimise the budgetary impact. 
4.5.3 Reporting to Committee
A Learning Estate Strategy Update paper will be presented to Education, Children’s and
Leisure Services Committee on an annual basis. This will include updates on ASG level
investment plans and short, medium and long-term priorities. 
Individual Project investment decisions will be presented for consideration by Committee
at the appropriate point in the Project Lifecycle.
Learning Estate capital spend updates will be presented to Education, Children’s and
Leisure Services Committee on a six monthly basis.
4.5.4 Investment in our learning estate
The delivery of learning estate investment plans will be dependent on the availability of
capital funding. The Scottish Government has indicated that 2022 is likely to be the final
round of the current national Learning Estate Investment Programme (LEIP). ASG level
plans will need to take account of the availability of funding over the life of the proposed
plan, taking account of the overall funding required to achieve the aims of the learning
estate strategy across Moray, and recognising that investment will need to be prioritised to
ensure we are delivering excellent and equitable learning environments for our children
and young people within a timescale that is fair and reasonable.
Page 112

Page 113

4.6 Learning Estate Programme Current Indicative High Level Plan (September 2022)
This timeline represents current prioritised work for the Learning Estate Programme (with funding identified within the Moray Council Capital Plan). This timeline is
subject to regular review and will be informed by ASG level plans, developed in consultation with communities and stakeholders over the next three years. Updates
to this plan will be included in the annual learning estate programme updates.
Page 113

Page 114

Page 114

Page 115

REPORT TO: MORAY COUNCIL ON 28 SEPTEMBER 2022 
SUBJECT: REPORT ON TREASURY MANAGEMENT PERFORMANCE AND
TREASURY AND CAPITAL INVESTMENT PRUDENTIAL
INDICATORS FOR 2021/22 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To provide Council with the annual outturn report on Treasury Management
and details of the Council’s Prudential Indicators for Treasury Management
and Capital Investment for the year ended 31 March 2022. 
1.2 This report is submitted to Committee in terms of Sections III B (8) of the
Council's Scheme of Administration relating to Treasury Management and the
Capital Plan. 
2. RECOMMENDATION 
2.1 It is recommended that the Council consider and note the Treasury
Management Performance and the Council’s Treasury Management and
Capital Investment Prudential Indicators for 2021/22 as set out in the
attached APPENDIX 2. 
3. BACKGROUND 
3.1 Members have agreed that reports on Treasury Management Performance
are submitted twice annually. One report to agree the Treasury Management
and Investment Strategies with relevant Performance Indicators and the
second report to submit the annual review and actual performance of
Treasury Management activities. Quarterly Treasury Management monitoring
reports are posted on the Members Portal throughout the year. 
3.2 The Council has adopted the CIPFA Code of Practice for Treasury
Management in the Public Sector 2021 (the Code) and the Local Government
Investment (Scotland) Regulations 2010. All treasury management activities
are carried out in accordance with the Code and regulations. 
3.3 The primary requirements of the Code are as follows: 
Item 13.
Page 115

Page 116

• An approved Treasury Management Policy, which sets out the policies
and objectives of the Council’s treasury management activities. 
• Approved Treasury Management Practices, which set out the manner in
which the Council will seek to achieve those policies and objectives. 
• An annual treasury management strategy report to Council for the year
ahead and an annual review report to Council of the previous year. 
3.4 The Local Government (Scotland) Act 2003 requires the Council to adopt the   
CIPFA Prudential Code for Capital Finance in Local Authorities and to
produce the prudential indicators set out in the Prudential Code. These
indicators are designed to support and record affordable and sustainable
capital investment and treasury management. 
4. TREASURY PERFORMANCE 2021/22 
4.1  This annual Treasury Management performance report covers: 
• The Economy and Interest Rates 2021/22
• Treasury Management Strategy for 2021/22
• Annual Investment Strategy 2021/22
• Investment Outturn for 2021/22
• Long Term Borrowing and Debt Rescheduling
• Short Term Borrowing
• Prudential Code for Capital Finance in Local Authorities 
The Economy and Interest Rates 2021/22
4.2 Throughout 2020/21 oil prices steadily increased following a slump as a result
of the pandemic and this was a trend that continued throughout 2021/22.
However due to the war in Ukraine and the impact this has had on fuel
supplies, prices saw a significant increase in March up to $117.25 a barrel,
which is the highest since 2008. 
4.3 The UK Consumer Price Inflation (CPI) has steadily increased throughout
2021/22. It was originally thought that inflation was to be temporary as areas
of the economy such as leisure and retail re-opened after the pandemic,
however, price rises became more widespread due to a combination of rising
costs and demand which was exacerbated by supply chain shortages. The
end of the year saw increases in the price of gas and electricity which saw
CPI for February reaching 6.2% and this is a trend that has continued into
2022/23 with inflation currently at record levels and forecast to rise further.
During the first three quarters of the year the labour market was sheltered
from the worst impacts of the pandemic due to the Government’s furlough
scheme. The labour market data for the three months to March 2022 showed
that the employment rate was 75.7%, 0.1% higher than the previous quarter
but still 0.9% lower than pre-pandemic levels. The unemployment rate was
3.7%. Average pay growth for the private sector was 8.2%, but was only 1.6%
for the public sector. The rate of pay growth was 7.0% for total pay (including
bonuses) and 4.2% for regular pay. In real terms (adjusted for inflation),
growth in total pay was 1.4% while regular pay fell by 1.2%. Strong bonus
Page 116

Page 117

payments have kept real total pay growth positive. The increasing difference
between nominal and real growth rates is because of increasing CPI. 
4.4 Gross Domestic Product (GDP) in the quarter to March 2021 increased by
0.8%, which was slightly below the estimated 1.0% when compared with the
previous quarter and 8.7% when compared with the same quarter of the
previous year. Although the increase in GDP was lower than originally
anticipated what was more telling was that in February and March GDP did
not increase at all which indicated that businesses and households had
reduced spending activity, perhaps in anticipation of the April increase in
energy prices. Construction saw a 3.8% quarter on quarter increase. This is
mainly because the sector saw a 7.4% increase in non-housing repairs and
maintenance. Other areas of the economy also saw increases with services
and production increasing by 0.4% and 1.2% respectively. 
4.5  Having increased the base rate from 0.10% to 0.25% in December, the Bank
of England increased it further to 0.50% in February and 0.75% in March. In
the March interest rate announcement the Monetary Policy Committee (MPC)
noted that the invasion of Ukraine had caused further large increases in
energy and commodity prices, with the expectation that the conflict will
worsen supply chain disruptions globally and push CPI higher, which has
been the case with CPI currently at record levels. 
4.6 Globally economies have seen the same trend as here in the United Kingdom.
The Federal Reserve in the America has increased interest rates and outlined
that future increases are likely. The Euro Zone saw nine successive months of
rising inflation and this is putting pressure on the European Central Bank’s
long term policy of holding its main interest rate at 0%. 
2021/22 Treasury Management Strategy
4.7 The Treasury Management Strategy, incorporating the Annual Investment
Strategy, was approved by the Council at its meeting on 3 March 2021
(paragraph 5 of the minute refers). 
4.8 The Council’s main objective when borrowing is to strike an appropriately low
risk balance between securing low interest costs and achieving cost certainty
over the period for which the funds are required. The flexibility to renegotiate
loans should the Council’s long-term plans change is a secondary objective. 
4.9 Given the significant real reduction in local government funding in recent
years and the impact of the pandemic, the Council’s borrowing strategy
continued to address the key issues of affordability without compromising the
longer term stability of the debt portfolio. With short-term interest rates much
lower than long-term rates, it was more cost effective in the short-term to
either use internal resources, or to borrow short-term loans instead. By
adopting this approach, the Council was able to reduce net borrowing costs
and reduce overall treasury risk. 
4.10 The Public Loans Works Board (PWLB) is the Council’s preferred source of
long-term borrowing given the transparency and control that its facilities
continue to provide. 
Page 117

Page 118

Annual Investment Strategy
4.11 The Council’s primary principle when investing is the security of capital and
liquidity of investments. As a secondary aim the Council will also aim to
achieve the optimum return on its investments, commensurate with proper
levels of security and liquidity. It is considered prudent to only invest with
highly credited UK financial institutions that have a long-term credit rating of
BBB+ or higher. 
4.12 The Council’s creditworthiness policy has been formulated after consultation
with Arlingclose, the Council’s treasury advisers. The Chief Financial Officer
maintains a counterparty list in compliance with the minimum criteria
approved by Full Council on 3 March 2020 (paragraph 4 of the minute refers)
and any revision to the criteria is submitted to Council for approval as
necessary. 
4.13 All credit ratings are monitored daily and the Counterparty list is amended to
reflect any changes. 
Investment Outturn for 2021/22
4.14  The Council manages its investments in-house and invests with the
institutions listed on the Council’s approved Counterparty list. 
4.15 The table below shows the overall investment undertaken by the Council
during 2021/22:   
Total Sum Deposited
(£m)
Average Rate (%)
Approved Financial
Institutions
294.982 0.06
Council’s Bankers 2.938 0.14
TOTAL 297.920 0.10 
The above figures are cumulative and the actual amounts invested at any one
time ranged from £10.51 million to £36.925 million. 
4.16 The average rate of interest earned on investments during the year was
0.10%, compared to the average 7 day London Inter Bank Bid Rate (LIBID) of
0.15%.   When the Bank of England base interest rate increases, our Bank of
Scotland call account rate is increased from that day and so is the LIBID rate. 
The money market funds in which we invest the balance of our funds take
time to catch up as their interest rates are not set and fluctuate depending on
the market and the size of investment in each fund.  Our investments are in
line with our Treasury Management practices with money deposited in the
funds available to us, redeeming from the ones with lower rates first. 
4.17 As at 31 March 2022, the following balance was invested: 
Counterparty Investment Amount (£m) Interest Rate
(%)
Bank of Scotland Call Account 10.000 0.70
Federated Money Market Fund 0.210 0.51
Page 118

Page 119

Counterparty Investment Amount (£m) Interest Rate
(%)
Blackrock Money Market Fund 4.355 0.53
CCLA Money Market Fund 5.000 0.58  
19.565 0.63 
Long Term Borrowing and Debt Rescheduling
4.18 The Council’s long term external debt position at 31 March 2022 compared
with the position at the end of the last financial year was as follows: 
31 March 2021 31 March 2022 
Actual
(£000)
Rate
(%)
Average
Life
(years)
Actual
(£000)
Rate
(%)
Average
Life
(years) 
Fixed Rate
Funding –
PWLB 
Fixed Rate
Funding –
Market 
142,758 
33,400 
4.70 
4.68 
17.34 
52.82 
134,150 
33,400 
4.85 
4.68 
17.26 
52.82
TOTAL DEBT 178,158 4.69  167,550 4.77 
There was no variable rate borrowing in the year. 
4.19 The Council has been maintaining an under borrowed position which means
that the capital borrowing need (Capital Financing Requirement) has not been
fully funded with loan debt. Cash supporting the Council’s reserves, balances
and cash flows have been used as temporary measures to offset the need to
borrow. 
4.20 The strategy of effectively delaying new long term borrowing by utilising
internal and temporary borrowing has served well at a time when
comparatively cheaper temporary borrowing from other local authorities is
readily available, and historically low investment returns give rise to potentially
significant carrying costs for new long-term borrowing. 
4.21 There was no new long term borrowing from the Public Works Loans Board
(PWLB) in the year. 
4.22 No debt rescheduling was undertaken during the year as the differential
between PWLB new borrowing rates and PWLB premature repayment rates
made rescheduling unviable. 
Short Term Borrowing
4.23 During the year, seventeen new temporary loans totalling £68m were
borrowed from other UK local authorities. A table detailing the short term
loans outstanding at 31 March 2022 can be found at APPENDIX 1. 
Page 119

Page 120

The Prudential Code for Capital Finance in Local Authorities
4.24 The Local Government (Scotland) Act 2003 requires the Council to undertake
its treasury activities with regard to the Prudential Code for Capital Finance in
Local Authorities. 
4.26 CIPFA published a revised Prudential Code for Capital Finance and Treasury
Management Code in December 2021. The key changes from the previous
code are around permitted reasons to borrow, knowledge and skills, and the
management of non-treasury investments. 
4.27 To comply with the Prudential Code, authorities must not borrow to invest
primarily for financial return. This Code also states that it is not prudent for
local authorities to make investment or spending decisions that will increase
the Capital Financing Requirement (CFR) unless directly and primarily related
to the functions of the authority. Borrowing is permitted for cash flow
management, interest rate risk management, to refinance current borrowing
and to adjust levels of internal borrowing. Borrowing to refinance capital
expenditure primarily related to the delivery of a local authority’s function but
where a financial return is also expected is allowed, provided that financial
return is not the primary reason for the expenditure. The changes align the
CIPFA Prudential Code with the PWLB lending rules. 
4.25 The Code requires the Council to produce mandatory indicators aimed at
assisting members in ensuring that proposed capital investment levels and
treasury management decisions satisfy the key requirements of affordability,
prudence and sustainability. The Prudential Indicators for 2021/22 were
approved at Full Council on 3 March 2021 (paragraph 5 of the minute refers).
The indicator of the proportion of debt maturing in less than 12 months was
breached in 2021/22.  Very low interest rates were available for short term
borrowing and advantage was taken of this to reduce the cost of borrowing to
the Council. This was a carefully considered action and was advised by the
Council’s Treasury Advisors and is not considered to be indicative of
problems with treasury management practice. Performance against key
indicators is shown in the APPENDIX 2. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
None arising specifically from this report. 
(b) Policy and Legal
The Local Government (Scotland) Act 2003 provides the power to
borrow and invest as well as providing controls and limits on these
activities. 
The Council has adopted the CIPFA Code of Practice for Treasury
Management in the Public Sector which details best practice The Local
Government Investment (Scotland) Regulations 2010. 
All Treasury Management activities are carried out in accordance with
the Code and Regulations.
Page 120

Page 121

(c) Financial implications
The financial implications are highlighted within the report and the
attached APPENDIX 2. 
(d) Risk Implications
The Council is aware of the risks of passive management of the treasury
portfolio and, with the support of the Council’s treasury advisers, will
proactively manage its investments and debt over the year. 
(e) Staffing Implications
There are no staffing implications arising directly from this report 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
There are no equalities issues arising from this report 
(h)    Climate Change and Biodiversity Impacts
There are no climate change or biodiversity issues arising from this         
report. 
(i)     Consultations
This report has been produced in consultation with Arlingclose Limited,
the Council’s Treasury Advisers. 
6. CONCLUSION 
6.1 The Council’s requirements for funds continues to be managed in
accordance with the agreed Treasury Management Strategy Statement.
All treasury management and capital investment activities have been
undertaken with the limits set by the Prudential Code Performance
Indicators for 2021/22. 
Author of Report: Laurie Milne, Senior Accountant
Background Papers: Various working papers held within Financial Services.
Ref: SPMAN-129-3228629-752 
Page 121

Page 122

Page 122

Page 123

APPENDIX 1 
Short Term Loans Outstanding as at 31 March 2022 
Organisation Maturity
Date
Borrowing
Rate (%)
Amount
(£m)
Middlesborough Council 17/05/2022 0.65% 5.00
Leeds City Council 17/06/2022 0.04% 5.00
Western Isles Council 27/07/2022 0.20% 5.00
Lichfield District Council 22/08/2022 0.20% 2.00
North Hertfordshire District Council 22/08/2022 0.20% 3.00
Hampshire County Council 26/08/2022 0.08% 5.00
Preston City Council 30/08/2022 0.15% 5.00
Blackburn with Darwen Borough Council 19/09/2022 0.08% 5.00
Ryedale District Council 19/09/2022 0.10% 2.00
East Suffolk Council 20/09/2022 0.20% 5.00
Gravesham Borough Council 20/09/2022 0.10% 3.00
Vale of Glamorgan Council 22/09/2022 0.08% 3.00
Improvement Service 30/09/2022 0.65% 2.00
Middlesborough Council – Teeside
Pension Fund
07/11/2022 0.10% 5.00
Somerset County Council 01/12/2022 1.25% 5.00
Warwickshire County Council 28/02/2023 0.35% 5.00
Bridgend County Borough 17/03/2023 0.35% 3.00
TOTAL   68.00 
Item 13.
Page 123

Page 124

Page 124

Page 125

APPENDIX 2
TREASURY AND PRUDENTIAL INDICATORS
External Debt and Treasury Indicators
1. The Authorised Limit for External Debt
The authorised limit for external debt is required to separately identify external
borrowing and other liabilities such as PPP, DBFM and finance lease obligations.
This limit provides a maximum figure to which the Council could borrow at any given
point during the financial year.
Authorised Limit 2021/22
Approved
Indicator
2021/22
Estimated
Indicator
2021/22 Actual
Maximum 
£000 £000 £000
Borrowing 388,542 352,536 236,757
Other Liabilities 56,425 56,425 54,365
Total External Debt 444,967 408,961 291,122 
The table shows that the limit was not breached. 
2. Operational Boundary for External Debt 
This indicator is a management tool for in-year monitoring and is based on an
estimate of the most likely level of external borrowing at any point during each year. 
Operational
Boundary
2021/22
Approved
Indicator
2021/22
Estimated
Indicator
2021/22 Actual
Maximum 
£000 £000 £000
Borrowing 337,536 373,542 236,757
Other Liabilities 55,425 55,425 54,365
Total External Debt 392,961 428,968 291,122 
The table shows that the limit was not breached. 
3. Actual External Debt 
This is measured at the end of each financial year. The actual external debt reported
in the annual accounts for the previous year is required to be shown as an indicator
for comparison purposes only. 
Actual Debt At 31 March 2021 At 31 March 2022 
£000 £000
Borrowing 254,353 236,757
Other Liabilities 55,882 54,300
Total Debt 310,235 291,057 
Item 13.
Page 125

Page 126

Other Liabilities include the PPP finance liability for Elgin Academy and Keith
Primary School which became operational during 2011/12, the DBFM finance liability
for Elgin High School and the finance liability for the leased multi-functional devices
(printer / scanner / copier). 
4. Treasury Management Indicator 
There are four treasury prudential indicators, the purpose of which is to contain the
activity of the treasury function within certain limits, thereby managing risk and
reducing the impact of an adverse movement in interest rates. However if these are
set to be too restrictive they will impair the opportunities to reduce financing costs.
The indicators are: 
• Upper limits on variable rate exposure – This indicator identifies a maximum limit
for variable interest rates based upon the debt position net of investments. 
• Upper limits on fixed interest rate exposure – Similar to the previous indicator this
covers a maximum limit on fixed interest rates. 
• Maturity structures of borrowing – These gross limits are set to reduce the Council’s
exposure to large fixed rate sums falling due to refinancing within the same financial
year, and are required for upper and lower limits. 
• Maximum period of investment - Following changes arising from the new
Investment Regulations applicable from 1 April 2010, the Council can invest for
periods longer than 364 days .The Council does not currently take advantage of this
change and so has set a limit of Nil for investing over 364 days. 
Fixed and Variable Rate Limits 
2020/21 Actual 2021/22
Approved
Limits
2021/22
Actuals
Interest Rate Exposures Upper Limit Upper Limit Upper Limit
Limits on fixed interest rates
based on net debt
100% 100% 100%
Limits on variable interest
rates based on net debt
0% 35% 0% 
Maturity Structure of Fixed Interest Rate Borrowing 
2020/21
Actual
2021/22 Approved Limits 2021/22
Actual
(£m)
2021/22   
%       
Lower Upper  
< 12 months 37.68% 0% 30% 75.608 32.10%
12-24
months
3.01% 0% 20% 7.754 3.29%
2-5 years 8.43% 0% 25% 27.750 11.78%
5-10 years 8.57% 0% 50% 22.355 9.49%
Page 126

Page 127

>10 years 42.30% 0% 85% 102.082 43.34% 
Short term rates are low compared to longer term borrowing and in 2021/22 the
Council has continued its policy of short term borrowing. This approach is advised by
the Council’s Treasury Advisors. As a result the approved limit of 30% has been
breached, however this is a result of carefully considered action and is not
considered to be indicative of problems with treasury management practice. 
Maximum Principal Sums Invested Greater than 364 days 
2020/21 Actual 2021/22 Actual
Principal sums invested >364 days £0m £0m 
Capital Expenditure Indicators 
5. Capital Expenditure 
This indicator is included so the Council complies with the Local Government in
Scotland Act 2003 which requires the Council to establish and keep under review
capital investment plans which are affordable. 
2021/22
Approved
Indicator
2021/22
Revised
Indicator
2021/22
Revised
Capital Plan
2021/22
Actual 
£000 £000 £000 £000
Capital
Expenditure    
General Services 44,709 33,950 39,274 44,409
HRA 17,629 27,285 11,769 27,285 
62,338 61,235 51,043 71,694
Financed by:    
Capital Grant &
Contributions
7,751 21,230 15,214 12,867
Reserves (Council
Tax Discount on
2nd Homes)
- - 662 525
Revenue 6,594 5,460 5,410 5,480 
14,345 26,690 21,286 18,872
Net Financing
Need for the Year
47,993 34,545 29,757 52,822 
The General Services Capital Programme for 2021/22 amounted to £44.409 million.
Expenditure for the year was £31.018 million, representing a net underspend of
£13.391 million. Various projects experienced delays due to ongoing issues
stemming from the Covid pandemic and pressures within global supply chains, the
most significant underspend being on the Town Centre Fund Initiative and was
£1.388m. The NESS Energy from Waste project was underspent by £5.508m and
experienced these same issues and also issues with labour shortages experienced
Page 127

Page 128

by the contracting company. The Council’s vehicle replacement programme and all
ICT projects saw delays due to extended lead in period for the delivery of component
parts and this added £1.032 and £0.653 million to the underspend respectively. 
The Housing Capital Programme amounted to £28.514 million and actual
expenditure was £11.769 million. The planned expenditure for 2021/22 included new
build at Bilbohall in Elgin but there were delays in getting planning permission for this
development. Thereafter there were difficulties in attracting a contractor, reflecting
the state of the market with fluctuating costs, labour shortages and difficulties with
the supply chain. There were also delays with planned new build in Aberlour.
Ongoing pandemic restrictions and supply chain issues resulted in a significant
underspend in planned housing improvements. 
Prudence Indicators 
6. Gross Debt and the Capital Financing Requirement 
This indicator records the extent that gross debt is less than the capital financing
requirement. This indicator shows prudence by demonstrating that over the medium
term external borrowing is used only for a capital purpose. The values are measured
at the end of each financial year. Debt is the sum of external borrowing and other
liabilities relating to the financing of assets (e.g. PPP, DBFM and finance leases). 
The Capital Financing Requirement (CFR) measures the Council’s underlying need
to borrow for capital investment. The capital financing requirement rises over the
period as a large proportion of the Council’s capital expenditure is financed by
additional borrowing thus increasing the Council’s total outstanding debt. 
The Council pays off an element of the accumulated debt each year through a
revenue charge (the scheduled debt amortisation). 
2020/21
Actual
2021/22
Approved
Indicator
2021/22
Revised
Indicator
2021/22
Actual 
£000 £000 £000 £000
Borrowing 254,353 322,623 286,269 236,757
Other
Liabilities
54,300 52,831 52,381 54,365
Gross Debt 308,653 338,650 338,650 291,122
CFR 341,891 366,152 366,263 351,980     
Under Limit
By
33,238 23,995 27,163 60,858 
The above figures confirm that the Council’s borrowing is well under the Capital
Financing Requirement. 
Page 128

Page 129

Affordability Indicators 
7. Ratio of Financing Costs to Net Revenue Stream 
This is an indicator of affordability and calculates the proportion of the net revenue
budget required to finance the costs associated with borrowing and investment. The
relevant proportions are set out below. 
Service 2020/21
Actual
2021/22
Approved
Indicator
2021/22
Revised
Indicator
2021/22
Actual
General Services 8.00% 9.78% 9.65% 8.27%
Housing Revenue
Account (HRA)
21.63% 20.73% 19.38% 20.72% 
The revised indicator for the HRA was based on reduced interest rates during the
year.  By the end of the year interest rates were rising and so the actual ratio is
higher than the revised indicator. 
8. Estimates of Incremental Impact of New Capital Investment Decisions on
Council Tax and House Rents 
This indicator demonstrates the expected incremental impact of planned capital
expenditure and associated borrowing on council tax and rent levels, calculated on
the assumption that capital expenditure is funded by an increase in Council Tax and
rent.   
Service 2020/21
Actual
2021/22
Approved
Indicator
2021/22
Revised
Indicator
2021/22
Actual
Council Tax –
Band D
£(33.47) £(12.40) £27.77 £(15.88)
Average Weekly
Housing Rents
£0.52 £1.35 £0.49 £0.62 
The calculated amount on Council Tax reflects the reduction in financing costs in
2021/22 due to low costs of borrowing.  Interest rates are rising and this will have an
impact on the Council’s future cost of borrowing. 
For the HRA the 2021/22 actual impact on rents was more than the revised indicator
due to the cost of borrowing increasing as a result of increases in interest rates
during the financial year.
Page 129

Page 130

Page 130

Page 131

REPORT TO: MORAY COUNCIL ON 28 SEPTEMBER 2022 
SUBJECT: MORAY GROWTH DEAL HOUSING MIX DELIVERY PROJECT
PROCUREMENT REQUIREMENT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To ask the Council to approve the appointment of external consultants to
update the economic appraisal in support of the preparation of the Full
Business Case (FBC) for the Moray Growth Deal Housing Mix Delivery
Project. 
1.2 This report is submitted to Committee in terms of Section III B (6) of the
Council's Scheme of Administration relating to any new policy matter which
does not fall within the terms of reference of any Committee. 
2. RECOMMENDATION 
2.1 It is recommended that the Council agrees the appointment of an
external consultant to undertake an economic appraisal to support the
preparation of the Full Business Case. 
3. BACKGROUND 
3.1 The Full Deal document for the Moray Growth Deal was signed on 20
December 2021. The Growth Deal includes 8 projects, and the Housing Mix
Delivery is one of them. 
3.2 The Housing Mix Delivery project aims to support and accelerate the delivery
of up to 360 affordable houses and plots, to support a minimum of 150 jobs
annually and to stimulate the private housebuilding sector to deliver up to 500
market houses, supporting town centre regeneration of brownfield sites and
provision of housing in rural towns and villages. 
3.3 The Outline Business Case (OBC) for the Housing Mix Delivery project was
approved by both the Scottish and UK Governments in November 2021. 
Item 14.
Page 131

Page 132

4. PREPARATION OF THE FULL BUSINESS CASE (FBC) 
4.1 Following the recent appointment of a Project Manager, the preparation of the
FBC is being progressed which requires all five cases set out in the OBC to
be further considered. 
4.2 The OBC Economic Case includes an economic appraisal that considers the
five short-listed options that were approved by the Housing Mix Delivery
Project Board on 27 October 2020. An economic appraisal for each short-
listed option was undertaken in line with the HM Treasury Green Book Central
Government Guidance on Appraisal and Evaluation (2018). It is presented as
a Cost Benefit Analysis in real terms (today`s prices with the effect of inflation
removed). The appraisal evaluated the investment objectives and benefits
and these were monetised and used to derive the cost/benefit ratio of each
option. The option with the highest cost/benefit ratio was selected as the
preferred option that would meet all project objectives.   
4.3 Given the time that has passed since the economic appraisal was undertaken
for the OBC, it is essential to update the appraisal to take account of current
benefits and costs, and to ensure that the preferred option meets all the
objectives of the project. The updated economic appraisal will re-evaluate the
cost/benefit ratio for each option, which are informed by updated benefits and
costs, reflecting the current economic challenges facing the construction
industry. 
4.4 The economic appraisal for the OBC was undertaken in-house by an officer
who was trained to carry out the task at high level but since they left the
Council, there is no one in-house with this expertise. Therefore, an
appointment of an external consultant via a Quick Quote process is required
to undertake an economic appraisal that would inform the FBC. In line with
Section 6.2.1 of the Moray Council Procurement Procedures (V19 December
2021), where a cost of appointing an external consultant exceeds £15,000,
committee approval is required. This work is estimated to be in the region of
£15,000-£20,000. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Housing Mix Delivery project will contribute to achieving the
corporate plan priority to promote economic development and growth,
also the LOIP priority of a growing and sustainable economy. 
(b) Policy and Legal
The Housing Mix Delivery project is a great example of the delivery focus
introduced by the Planning (Scotland) Act 2019 and further advocated by
the draft National Planning Framework 4 (NPF4) to support the delivery
of more and better homes, in the right locations, providing choice across
tenures. 
Page 132

Page 133

(c) Financial implications
The cost of appointing an external consultant will be met from the
existing Housing Mix Delivery project budget. 
(d) Risk Implications
The lack of an updated economic appraisal could risk the Council
progressing with a preferred option that does not meet all objectives of
the project. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
None arising from this report. The Equalities Impact Assessment
included in the OBC will be updated for the FBC. 
(h) Climate Change and Biodiversity Impacts
The Housing Mix Delivery project has the principles of addressing fuel
poverty, promoting innovative sustainable design, health and well-being;
and delivering carbon conscious homes. 
As part of the Housing Mix Delivery OBC Economic Case, a carbon
calculation was undertaken and this will be recalculated in the FBC as
further details emerge around building specifications and renewable
energy sources to give a more accurate monetised value for carbon
emissions. 
There are no climate change or biodiversity impacts directly resulting
from this report. 
(i) Consultations
Depute Chief (Executive Economy, Environment and Finance), Head of
Economic Growth & Development, Chief Financial Officer, Assistant
Manager Procurement, Legal Services Manager, Moray Growth Deal
Programme Manager, George Gunn (Climate Change Strategy Officer),
Equalities Opportunities Officer and Tracey Sutherland (Committee
Services Officer). 
5. CONCLUSION 
5.1 This report sets out the requirement for an external consultant to
undertake an economic appraisal to support the preparation of the
Housing Mix Delivery project Full Business Case (FBC) which is the next
step towards delivery of the project.   
5.2 The report asks the Council to approve the procurement requirement
and allow officers to progress with a Quick Quote process. 
Page 133

Page 134

Author of Report:  Hilda Puskas
Senior Project Manager (Housing Mix Delivery)
Background Papers: 
Ref: 
Page 134