Moray Council 
Wednesday, 25 October 2023 
SUPPLEMENTARY AGENDA 
The undernoted reports have been added to the Agenda for the meeting of the
Moray Council to be held at Council Chambers, Council Office, High Street,
Elgin, IV30 1BX on Wednesday, 25 October 2023 at 09:30. 
BUSINESS 
2a. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 9 and 10 of
business on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
6a. Medium to Long Term Financial Strategy
Report by Depute Chief Executive (Economy, Environment and
Finance)  
3 - 28
6b. Cloddach Bridge
Report by Depute Chief Executive (Economy, Environment and
Finance)  
29 - 38 
9. Short to Medium Term Financial Plan [Para 1]
• 1. Information relating to staffing matters; 
Page 1

Page 2

10. No Complulsory Redundancy Principle [Para 11]
• 11. Information relating to any consultations or negotiations in
connection with any labour relations; 
Page 2

Page 3

REPORT TO: SPECIAL MORAY COUNCIL ON 25 OCTOBER 2023 
SUBJECT: MEDIUM TO LONG TERM FINANCIAL STRATEGY 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To ask Council to consider an updated financial strategy to facilitate
medium to long term financial planning. 
1.2 This report is submitted to Council in terms of Section III (A) 2 of the
Council's Scheme of Administration relating to long term financial plans. 
2. RECOMMENDATION 
2.1 It is recommended that Council approves the updated Medium to 
Long Term Financial Strategy at APPENDIX 1 to this report. 
3. BACKGROUND 
3.1 The Council’s Corporate Plan 2019/2024 was approved by Council on 3
March 2020 (paragraph 6 of the Minute refers) and the Medium to Long
Term Financial Strategy was approved as a partner piece of the Corporate
Plan at the same meeting of Council (paragraph 5 of the Minute refers).  An
interim update to the Medium to Long Term Financial Plan was approved by
Council on 3 March 2021(paragraph 6 of the Minute refers).   The Corporate
Plan provides direction and focus for financial planning through clarification
of corporate priorities. Council on 23 August 2023 (paragraph 8 of the
Minute refers) approved a draft Vision and high level Council priorities for
the Corporate plan 2024-29 for workforce and public consultation alongside
financial planning engagement. 
3.2 The Financial Strategy looks at the context in which the Council is planning
for the future. It reflects the Scottish Government’s medium term financial
strategy, as updated on 25 May 2023, and current population estimates. 
These will be updated when the National Records of Scotland produce
update projections based on information from the 2022 census and so a light
touch view is given in the Strategy. 
3.3 The Financial Strategy identifies the principal cost drivers for the Council’s
services, and looks at the impact of these under a number of different
Item 6a.
Page 3

Page 4

scenarios - essentially taking a range of options for these cost drivers from
a more optimistic to a more pessimistic point on a scale. This enables an
assessment of the possible financial position of the Council over the next
ten years.  As noted in the Strategy, the characteristics of a long term
financial strategy are quite different from a short term strategy, with the
focus being on factors which are uncertain and a low degree of detail,
looking at scenario planning to give a range of expected outcomes. 
3.4 The Strategy also sets out the main vehicles which the Council will use to
make strategic shifts in expenditure, in order to achieve financial
sustainability and this has been updated to reflect work which has been
ongoing over the last year and emerging work streams now planned for the
future.  The main vehicles will be asset management, service redesign and
planning for future demand.  As workstreams in these areas are developed
they will be reported back to Council for approval. 
3.5 As referred to in paragraph 3.2 an in-year review of the Medium to Long
Term financial strategy is intended to reflect the impact of revised population
projections.  Thereafter this Strategy will be reviewed annually as part of the
Council’s financial planning process. 
3.6 The Strategy includes consideration of increased in Council Tax.  This has
not been adjusted for the recent announcement of a Council Tax freeze for
2024/25, as that will be dealt with in the Short to Medium Term Financial
Strategy, and the assumption for the medium to long term is that increasing
Council Tax will remain a realistic option for Scottish local authorities. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The Financial Strategy is a companion document to the Corporate Plan. 
(b) Policy and Legal
There are no direct policy and legal implications arising from this report. 
(c) Financial implications
There are no direct financial implications arising directly from this
report. The Financial Strategy sets out the financial parameters within
which the Council’s financial planning activity is expected to take place
over the next ten years and looks at the main means of mitigating
potential budget gaps. 
(d) Risk Implications
Although the Strategy looks at the long term, the further off the financial
projections are the greater risk of inaccuracy.   
(e) Staffing Implications
No staffing implications arise directly from this report. 
(f) Property
No property implications arise directly from this report.
Page 4

Page 5

(g) Equalities/Socio Economic Impact
There are no equalities issues or impact on the socio-economic duty
arising from this report. 
(h) Climate Change and Biodiversity Impacts
There are no implications for Climate Change and Biodiversity arising
directly from this approach.  The Council’s Climate Change Strategy and
Road Map to Net Zero will have significant influence on the Council’s
planned future spend. 
(i) Consultations
The Medium to Long Term Financial Strategy has been prepared in
consultation with CMT and SMT. 
5. CONCLUSION 
5.1 The Financial Strategy provides a detailed consideration of the
factors which will impact on financial planning over the medium to
long term and sets out the factors which the Council will have to
consider in realigning its finances to achieve financial sustainability. 
5.2 Reflecting the Council’s current plans and the wider context in which
the Council makes these plans the Strategy indicates a continued
challenge to achieve and maintain financial stability. 
Author of Report: Lorraine Paisey, Chief Financial Officer
Background Papers: 
Ref: SPMAN-1293228629-957 
Page 5

Page 6

Page 6

Page 7

APPENDIX 1
Medium to Long Term Financial Strategy
1. Background 
1.1 On 1 March 2023 the Council set a balanced one year revenue budget for 2023/24. In
doing so, it was acknowledged that based on current assumptions at that time,
significant funding gaps existed in future years.  In order to balance the budget the
total anticipated savings required were £19.84m in 2024/25 and £1.06m in 2025/26. 
1.2 Significant use of reserves was planned to balance the budget in 2023/24.  This is not
a sustainable position. Using reserves to avoid cuts in the short-term will only provide
temporary relief.  The Council faces two challenges: to remove the reliance on
reserves (the structural or underlying deficit in funding) and to contain budget
pressures from increased demand in services and/or inflation. 
1.3 The Short to Medium Term Financial Strategy, approved by Council on 27 September
2023, sets out a strategy to remove the structural deficit by 2025/26. It includes the
financial levers in the diagram below. - These levers are the key to both the short to
medium and medium to long term financial strategies of the Council.  The movement
from each of these levers impacts on the required movement from the others in order
to get a sustainable, balanced budget. 
1.4 This Medium to Long Term Financial Strategy builds on the Short to Medium Term
Financial Strategy and extends the financial planning time frame to 10 years. 
Characteristics of financial planning horizons in the Short, Medium and Long term are
set out in the table below. 
Short Term Medium Term Long Term
Nature Budget Financial Plan Financial Strategy
Timeframe Annual 2-5 years 3-10 years +
Focus Accountability Performance Transformation
Unpredictability Risk Risk/Uncertainty Uncertainty
Financial
Techniques
Estimating Forecasting Scenario Planning
Level of Detail High Medium Low 
Council Tax Other Income
generation
Staff
establishment Asset base
Item 6a.
Page 7

Page 8

1.5 The Medium to Long Term Financial Strategy (MLTFS) is an important part of the
financial planning process. It reinforces the longer term sustainability of the Council by
ensuring that the financial commitments required for good quality services are
sustainable within a changing economic outlook over the next 3-10 years. 
1.6 The strategy makes a number of key assumptions and, while it is recognised that
future projections covering a 10 year period will contain some degree of uncertainty,
these assumptions are clearly laid out below.  In doing this, the Council has reviewed a
range of possible outcomes with an optimistic (i.e. a positive for the Council budget),
pessimistic (negative position for the Council) and mid-range scenario.  It is assumed
that the mid-range scenario will be taken as the most likely outcome. 
1.7 The strategy places a lot of weight on achieving strategic and significant cost-
cutting/savings proposals, concurrent with the Council’s priorities within the Corporate
Plan.  The intended outcome of the financial strategy is a sustainable financial plan,
with planned revenue expenditure met by budgeted revenue income, with use of
reserves to balance the budget kept to a minimum and targeted towards
transformation of council services. 
1.8 The strategy covers the period 2024/25 to 2033/34 with 2023/24 as base year. The
main focus is on 2026 onwards as the Short to Medium Term Financial Strategy
covers years 1 and 2 and is more detailed than this high level Strategy. It will:
• Highlight the key influences, risks and cost drivers for the Council’s service
delivery
• Outline the Council’s high level position over the years 2024/25 to 2033/34
• Facilitate planning ahead to enable the impact of change to be managed more
proactively and effectively
• Plan for a sustainable revenue budget and capital investment programme
which will support the Council’s priorities and address the key issues for Moray
• Assist in increasing the people of Moray’s understanding of the Council’s
financial position and the challenges facing it over the next ten years. 
1.9 This Strategy sets out the financial roadmap for the Council for the medium to long
term and gives background to the various financial pressures and drivers that will
impact on the wider economy, and the communities in Moray.  It will be reviewed no
less than annually as part of the Council’s financial planning process, with updates of
the short-medium term position reported to Corporate Management Team and
Corporate Committee on a regular basis.  The inclusion of information in the Strategy
does not imply approval.  All financial estimates are subject to approval by Council as
part of the budget setting process. 
1.10 The scope of this Financial Strategy is the Council‘s General Fund.  The Council’s
Housing Revenue Account (HRA) is ring-fenced, according to statutory requirements,
and consequently financial planning for the HRA is a separate exercise. 
1.11 The Medium to Long Term Financial Strategy forms part of a suite of documents used
in the Council’s financial planning, alongside: 
• the Council’s Corporate Plan
Page 8

Page 9

• the three year budget reported when the budget for the year is set and
regularly updated in reports to the Council
• the indicative 10 year Capital Plan, underpinned by the Council’s Capital
Strategy
• the Council’s Reserves Policy
• the Council’s Charging Policy
• the Treasury Management Policy
• the Short to Medium Term Financial Strategy 
2. Key Influences 
2.1 In May 2023 the Scottish Government published its updated Medium-Term Financial
Strategy.  While this does not replace the Scottish Budget, it addresses Scotland’s
economic outlook for the period 2023/24 to 2027/28 and provides a useful awareness
of estimated future funding and spending priorities at national level.  A key point from
the document is that “Economic conditions in Scotland and the UK continue to remain
challenging as inflationary pressures continue to create a cost of living crisis for
households and businesses across the country and increase pressures on public
services.”  The Council’s MLTFS will take on board some of the key influences and
risks included in the Scottish Government’s strategy and apply to its own position. 
2.2 External influences outwith the Council’s control include economic changes, such as:
• Rate of Inflation
• Interest rate fluctuations
• Level of grant funding from the Scottish Government
• Pay agreements 
2.3 Climate related issues:
• Climate change – Council’s policy
• Flooding
• Storm damage
• Winter maintenance 
2.4 Internal Influences
• Corporate priorities
• Transformation of services
• Asset Management of the Council’s schools and other properties
• Participatory Budgeting, commitment to giving communities the influence on
decisions for 1% of the Council’s budget
• Affordability and sustainability of the Council’s revenue and capital programme 
2.5 These are key variables that influence the financial planning of the Council and, while
not an exhaustive list, these will be measured using a scenario basis that can be
routinely updated to keep assumptions in line with the economic outlook.  In doing so
this ensures that the Council continues to meet its statutory obligations in line with its
corporate policies.  The key variables to be used are: 
• Inflation, including pay awards
• Anticipated Scottish Government funding
Page 9

Page 10

• Council Tax income
• Interest Rates and Loans Charges
• Increased demand for services
• Savings from Transformational change 
3. Cost Drivers 
3.1 The Council’s budget of £348 million gross revenue expenditure for 2023/24 includes
£185 million for staff. Pay awards and pension costs are key cost drivers for the
Council. Pay awards for 2023/24 have not yet been agreed for non-teaching staff, and
with the most recent negotiations at higher than the Council has budgeted for this year,
any further increases will have a substantial effect on current and future years financial
planning. 
3.2 A significant proportion of the Council’s services are out-sourced, with 18% of the
Council’s expenditure being on services delivered by third parties. The procurement
process therefore has a strong influence on the costs borne by the Council and
significant savings have been made by procurement on the purchase of supplies and
services as well as on out-sourced services. 
3.3 The split of the Council budget is shown below. 
Medium to Long Term Financial Strategy 
4. Sensitivity Analysis and Budget Assumptions 
4.1 Key budget assumptions are set out below, showing the scenario and what impact that
variation has on budget projections for each of the next three years, as well as years 4
to 10 together. 
5. Inflation 
5.1 Cost pressures arise from the Council’s contractual obligations which are uplifted for
inflation.  Such inflationary uplifts are difficult to forecast as a result of uncertainties in
the economy and how effective attempts by the Bank of England at reducing inflation
Budget 2023/24
Staff
Property
Supplies & Services
Transport
Third Parties
Benefits & Grants
Loans Charges
Page 10

Page 11

will be, especially within the projected timescales.  Inflation affects a small number of
significant contracts – in particular the PPP schools contract – and also covers
potential increases in utilities; energy prices have been one of the main forces in
driving inflation levels in recent years.  The cost of utilities and fuel has been volatile
over the past couple of years, with additional budget pressures identified for these
areas. 
5.2 The outlook for inflation remains a key source of uncertainty yet has a crucial influence
in long term financial planning, particularly around pay and core contract inflations
increases that are often linked to, or kept as closely aligned as possible, to inflation. 
5.3 The Scottish Fiscal Commissions (SFC) are a non-Ministerial Office who produce
Scotland’s official, independent economic and fiscal forecasts to accompany the
Scottish Government’s Budget cycle, and who are accountable to the Scottish
Parliament for their functions (set out in the Scottish Fiscal Commission Act 2016),
reporting twice a year.  The Office for Budget Responsibility (OBR), an official
independent fiscal watchdog that produces detailed forecasts for the economy and
public finances, also provide UK Government with forecast data.  Both bodies
expected Consumer Price Index (CPI) inflation to have peaked in the fourth quarter of
2022 before beginning its descent.  The SFCs most recent forecast in May 2023
indicates a sharp decline in the rate of inflation in 2023.  Inflation is expected to fall
rapidly, reaching 0% from mid-2024 to mid-2026 as energy bills fall back and supply
issues reverse.  Inflation is then expected to return to the Treasury’s 2% target
thereafter for the remainder of the ten year outlook as the diagram below shows. 
Solid lines refer to outturn available at time of publication and dashed lines refer to
forecasts.
Source: Scottish Fiscal Commission
Office for Budget Responsibility (OBR) “Long term economic determinants – March
2023 Economic and fiscal outlook” published in June 2023 https://obr.uk/data/
Page 11

Page 12

Forecasts for Inflation (CPI, year on year)
5.4 The latest published CPI inflation forecasts from the OBR are: 
5.5 When the budget for 2023/24 was approved, indicative figures for 2024/25 and
2025/26 were based on the forecast assumption at that time that inflation, having
peaked at over 11% in October 2022, would rapidly return to the Treasury target of
2%.  Events in recent months have seen inflation dropping at a far slower rate than
forecast at the beginning of the calendar year.  A base budgeted provision of £3.3m
was included in the 2023/24 budget for expected inflationary increases, including pay
awards, with an additional £5million included as a budget pressure for additional
budget pressures that were more than probable. 
5.6 The provision for inflation needs re-evaluating in terms of the short-medium and
medium-long term financial planning of the Council as, although inflation has begun to
fall and is continuing to show signs of reducing, uncertainty remains high, particularly
for the economy with expectations of how inflation and interest rates will go forward
together.  The Council’s Treasury Advisors, Arlingclose, provide regular economic
updates including inflation measures. CPI inflation in August 2023 was 6.7%, therefore
it is proposed to assume a slower rate of recovery than the forecast rates suggested in
the table above, in order to be more prudent and err on the side of caution in such a
volatile situation. 
5.7 Key contracts receive an uplift in line with inflation for the prior 12 month period. For
scenario planning, the mid-range scenario will apply a more cautious rate of the
forecast inflation rate in the table +2% before stabilising at 2% in 2028/29 as forecasts
suggest, thus removing the drop to 0% in assumptions, which even at that is still a
positive outlook to come back to Treasury targets in a relatively short space of time,
and assumes no fluctuations.  The optimistic scenario will be 1% less (until assuming
the 2% target from 2028/29) and the pessimistic at 1% higher than mid-range. 
5.8 The areas of cost pressures for inflation provisions are:
• Contracts – service contracts
• Contracts – PPP, Energy 
• Pay 
Contract inflation 
5.9 In summary, cost pressures arising with service contract inflation (excluding pay
awards, energy and PPP contract uplifts which are shown separately) are as follows: 
Optimistic Mid-range Pessimistic
Assumption Mid-range -1% CPI forecast +2% Mid-range +1%
Year 1 £0.510m £0.610m £0.710m
Year 2 £0.168m £0.276m £0.386m
Year 3 £0.107m £0.218m £0.333m
Years 4-10 £0.191m - £0.227m £0.303m - £0.234m £0.420m - £0.369m 
2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Inflation (Consumer Price Index (CPI)) 4.1% 0.6% 0.0% 0.8% 1.7% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%
Page 12

Page 13

Energy Contracts 
5.10 Energy costs includes oil, gas, electricity, water and street lighting and unmetered
electricity.  The nature of these costs is such that inflation is not the only influencing
factor; markets are volatile and affected by the national and global economy.  As such,
to predict with any level of accuracy the long term position on energy costs is
impossible and current forecasts available to the Energy Team only go to 2025/26. 
Updated prices and consumption along with forecast are reported each year in the
annual Energy Report.  The scenarios have been calculated using 2022/23 full year
consumption as a basis.  However, energy efficiency measures as part of the Council’s
Road Map to Net Zero may go some way to reduce energy consumption. 
5.11 Scenarios for energy costs have been calculated on the same basis as contract
inflation above but with a wider range given the volatility of the energy market: the mid-
range adopts forecast CPI +2% until levelling at 2% in 2028/29, the optimistic scenario
will be 4% less and the pessimistic at 4% higher than mid-range. 
5.12 In summary, inflation pressures associated with Energy costs are as follows: 
Optimistic Mid-range Pessimistic
Assumption Mid-range -4% CPI forecast +2% Mid-range +4%
Year 1 £0.121m £0.353m £0.584m
Year 2 (£0.083m) £0.160m £0.420m
Year 3 (£0.116m) £0.126m £0.407m
Years 4-10 (£0.068m) –
(£0.104m)
£0.180m - £0.148m £0.489m - £0.627m 
PPP 
5.13 The Council’s PPP schools contract is a significant contract that attracts an annual
inflationary increase for the payments. The level of uplift applicable to the contract is
the value of the Retail Price Index (RPI) for the month of February immediately
preceding the indexation review date (1 April) compared to the value of RPI at the
base date. As with the above scenarios for service contract and energy costs, the PPP
assumptions will follow the same reasoning: the mid-range scenario will apply the
forecast RPI rate +2% before stabilising at 2% in 2030/31 (two years behind CPI), the
optimistic scenario will be 1% less (until assuming the 2% target from 2030/31) and the
pessimistic at 1% higher than mid-range. 
5.14 In summary, budget pressures associated with the PPP contact are as follows: 
RPI Optimistic Mid-range Pessimistic
Assumption Mid-range -1% CPI forecast +2% Mid-range +1%
Year 1 £0.620m £0.704m £0.788m
Year 2 £0.198m £0.291m £0.385m
Year 3 £0.184m £0.281m £0.382m
Years 4-10 £0.291m - £0.224m £0.396m - £0.238m £0.507m - £0.389m 
Page 13

Page 14

6. Pay 
6.1 Pay accounts for over £185m of budgeted expenditure across the Council.  Pay
agreements for Council staff, including teachers, are negotiated at a national level. 
The 2022/23 budget process saw 2% included for the pay award however, as
circumstances in the economy quickly changed with inflation rapidly increasing, and
the cost of living crisis, pay awards actually averaged over 6% in the year, after
agreements were reached for both the Scottish Negotiating Committee for Teachers
(SNCT) and Scottish Joint Councils (SJC) pay deals.  The Council must satisfy itself
that the pay bill and pay awards for the workforce are affordable and sustainable and
remain within existing budget allocations. 
6.2 In response to high inflation, average pay growth accelerated in 2022/23 and
continues to remain uncertain for 2023/24 for much of the Council’s workforce with
current negotiations for non-teaching staff ongoing at the time of preparing this
strategy. The Council’s financial planning requires to take a sensible approach to
future pay settlements as it is such a significant portion of the budget that even a
modest change in assumption can affect the decisions made regarding the other
financial levers. 
6.3 The Scottish Government’s 2023/24 Public Sector Pay Strategy was published in
March 2023, at a time when the pay awards for 2023/24 for much of the Scottish
Public Sector were still in contest. Key features of the 2023/24 Public Sector Pay
Strategy are:
• The implementation of the real Living Wage rate of £10.90 per hour, including
internships and Modern Apprenticeships;
• A suggested cash underpin of £1,500 for public sector workers who earn
£25,000 or less;
• Pay uplift for Chief Executives is capped at the same cash amount as the
lowest paid; 
• Setting a pay award floor of 2%; and
• Recommending a central metric of 3.5% and setting both an award ceiling and
pay envelope maximum of 5% on business efficiencies and/or pay bill savings
Source Public Sector Pay Strategy 2023/24 
6.4 The Council’s Short to Medium Term Financial Strategy recognises that due to inflation
currently running at an elevated level, the effects are a likelihood of a higher than
budgeted increase in the Real Living Wage which then leads to higher contract
inflation in 2024/25 than currently budgeted for as well as creating pressures for pay
negotiations.  Likewise, the outlook in the long term for pay awards is one of
uncertainty. 
6.5 For planning purposes, alternative scenarios setting out the best and pessimistic
outlook are presented in the tables below. The Public Sector Pay Strategy says the
Scottish Government sets a pay floor of  2%, therefore this is the optimistic scenario in
the model. The pessimistic scenario, assuming a pay award to be fully funded by the
Council, is 4%. The mid-point is 3%. 
Page 14

Page 15

6.6 In summary, budget cost pressures arising from workforce pay increases are as
follows: 
Optimistic Mid-range Pessimistic 
Assumption 2% 3% 4% CPI forecast
+2%
Year 1 £3.840m £5.760m £7.680m £11.711m
Year 2 £3.917m £5.932m £7.987m £5.296m
Year 3 £3.995m £6.110m £8.306m £4.180m
Years 4-10 £4.075m -
£4.589m
£6.294m -
£7.515m
£8.638m -
£10.930m
£5.969m -
£4.920m 
7. Funding from the Scottish Government 
7.1 The main source of the Council’s funding is from the Scottish Government, which
provides around 80% of the Council’s net revenue budget each year in the form of
General Revenue Grant and Non Domestic Rates income.   
7.2 The Scottish Government’s Medium Term Financial Strategy in May 2023 addressed
their funding outlook for the next five year period, recognising that the outlook has
changed significantly since the previous year.  The main movements relevant to local
authorities were due to the Scottish Government allocating an additional £1 billion to
the health and social care budget to provide a 10.1% inflationary increase to the level
of social security benefits, along with an additional £900m reallocated towards the
public sector pay awards.  The impact of these moves changed the Scottish
Governments 2022 spending and future funding baselines. 
7.3 As is the case for the Council at a local level, demand-led expenditure is likely to lead
to significant gaps at a national level as the Scottish Government focus on spending
demands in areas like health and social care and education.  Their strategy states “In
order to prioritise the programmes that will have the greatest impact on delivery of our
three missions, such as early learning and childcare, we will need to deprioritise
programmes that make a less meaningful contribution to our central missions.”  This
suggests that local government (except for these priority areas) will be viewed as lower
priority and subject to further reductions in funding support. 
7.4 The Scottish Government expect a decrease in real-terms funding in 2024/25 from
2023/24 after social security spending plans and ring-fenced Scottish local authority
funding is taken into account.  Inflationary pressures are expected to be greater than
recent years but modest compared to 2022/23.  It is anticipated that the Scottish
Government will provide clarity on details of its budget plans in November 2023, and
the Local Government Finance Settlement in December 2023. 
7.5 Until the settlement is announced, non-protected budgets are expected to face
reduced settlements in the medium to long term.  The optimistic scenario assumes a
2% increase from 2024/25, mid-range assumes 1% increase for one year then flat
cash for the remainder of the plan.  The pessimistic scenario assumes   a 1%
reduction  year on year.  This translates to the cash movements detailed below. 
Page 15

Page 16

• Increase 2% - £3.9m
• Increase 1% for three years only
• Decrease 1% (£1.94m) 
Optimistic Mid-range Pessimistic
Assumption +2% 1% then Flat cash -1%
Year 1 £3.88m £1.94m (£1.94m)
Year 2 £3.96m £1.96m (£1.92m)
Year 3 £4.04m £1.98m (£1.90m)
Years 4-10 £4.12m - £4.64m £0 (£1.88m) – (£1.77m) 
7.6 In June 2023 a new agreement was signed between the Scottish Government and
Local Government that is expected to support the Scottish Government’s proposed
new deal for Local Government.  Known as ‘The Verity House Agreement’ (VHA) it will
also see a Fiscal Framework introduced to re-establish joint-working in a partnership
focussed on achieving shared objectives for all Local Government communities. 
There is a commitment towards three key priorities: 
• Tackling poverty, especially child poverty
• Transforming our economy through a just transition to deliver net zero
• Delivering sustainable, person-centred public services 
7.7 A keynote issue addressed in the VHA is the approach to ring-fenced funding by the
Scottish Government and the limitations that increasing levels of such funding puts on
councils.  The benefits to the Scottish Government of ring fencing funding, where it can
only be used for specific purposes, are that its priorities can be delivered at a local
level and often within stipulated parameters and timescales.  Ring-fenced funding has
conditions attached and typically a clawback clause if the conditions aren’t met.  There
are other forms of restriction on funding, where Scottish Government sets clear
expectations as to the use of funding and frequently requires reporting on the use of
such funding even when given as part of General Revenue Grant.  There are
drawbacks to the Council when receiving ring fenced and other funds with
conditionality as part of the total revenue allocation: additional monitoring and reporting
requirements require staff resources; lack of flexibility may impede development of
local solutions; the emphasis is on input rather than outcomes.  A recent update on the
Agreement is that a review of ring-fenced or specific grants to Local Government is
being undertaken with a view to baselining these, giving Councils more flexibility to
address their priorities.  The changes brought about by the VHA will hopefully give
greater control to the Council over its budget, by giving the freedom to be resourceful
and removing the administration that ring-fenced funding and specific grants often
come with.  However, truly ring-fenced grants form a relatively small part of funds
given from Scottish Government with conditionality and it is unclear to what extent
effective control by Scottish Government of much local authority spend will be
reduced. 
7.8 It is anticipated that some issues addressed in the VHA may be put into place as early
as the 2024/25 settlement. 
8. Council Tax Income 
Page 16

Page 17

8.1 Council Tax income accounts for 20% of the Council’s revenue and is the main fiscal
lever that local authorities have.  In setting Council Tax, estimated income is based on
a combination of Band D equivalent numbers (the Council Tax base), householder
base (single occupancy and other discounts) and the expected rate of collection. 
8.2 The Council has discretion to increase tax levels however this has been capped in
recent years through conditions set out by the Scottish Government in the annual local
government settlement.  The Council’s Band D equivalent was £1,135 for 10 years
between 2007/08 and 2016/17 when the Scottish Government’s Council Tax freeze
ended.  The freeze was reinstated in 2021/22 during the Covid-19 pandemic. 
8.3 Crucially, the rate of Council Tax must provide the Council with a degree of certainty
around current and future funding levels.  The system must therefore be stable and
buoyant to provide this certainty, and must not expose the Council to an
unmanageable degree of financial risk by reduced collection rates.  The number of
chargeable dwellings vary only relatively modestly year to year, reflecting new
dwellings as well as properties removed. 
8.4 There are general assumptions made when budgeting for Council Tax revenue raised:
collection rates and the buoyancy of the tax base.  The scenarios adopted in the long
term planning are twofold: increases in Council tax and an assumption for an element
of growth in the tax base. 
8.5 For each 1% increase in Council Tax rates, at current 2023/24 rates, the Council could
raise approximately £500,000 in additional revenue.  For scenario planning the
following key assumptions have been made in relation to Council Tax increases: all
scenarios include a 0.6% increase in the number of chargeable dwellings each year,
and maintain a stable collection rate of 98.5% (96.5% in year + 2% prior year
recoveries) as these are not variables the Council has control over, although it is
appreciated that as the % rate increases so does the risk of failure to pay resulting in a
decrease in collection rate. 
• the pessimistic scenario – from the Council’s perspective – is based on a 2%
increase in rates, which long term would be an inflationary increase only
• the mid-point scenario is based on the assumption that the Council will apply a
5% increase to Council Tax rates.
• the optimistic scenario assumes a 10% increase. 
• An increase based on year on year inflation (CPI) is also shown but given
some years are predicted to be 0% before stabilising at 2% this would be
counter-productive in generating additional income to pay for services and
would not be a recommended option. 
8.6 In summary, additional revenue income generated from Council tax receipts year on
year are as follows: 
Optimistic Mid-range Pessimistic Inflation
Assumption 10% 5% 2% CPI%
Year 1 £5.335m £2.877m £1.402m £0.714m
Year 2 £5.806m £2.940m £1.339m £0.323m
Year 3 £6.428m £3.107m £1.374m £0.726m
Page 17

Page 18

Years 4-10 £7.117m-
£13.105m
£3.283m-
£4.572m
£1.411m-
£1.650m
£1.195m-
£1.572m 
8.7 Other revenue-raising methods that may give rise to additional income depending on
the extent of changes in legislation and development of Council policy are:
• Council Tax on second homes and empty properties
• NDR Empty Property Relief
Given the uncertainties about future proposals for Council Tax nationally and the need
for Council to develop policy positions, no additional income is assumed at this stage
in the Medium to Long Term Financial Strategy, although the potential for this is noted
in the Short to Medium Term Strategy.  It would not be prudent to import this into
longer term calculations without a degree of certainty 
8.8 There are also Council Tax reform measures currently out for consultation which would
increase rates in Bands E to H on an increasing scale to generate additional funding.
As this is not yet approved these potential increases have not been included in the
scenarios below, on the same grounds of prudence as mentioned in paragraph 8.7
above.. 
9. The Cost of Capital Borrowing 
9.1 The Council’s revenue budget is interconnected to the financing of its capital
expenditure and to the treasury management function that lies beneath the day to day
transactions of the Council’s service provision.  When the Capital Programme is
approved, the impact of debt and borrowing requirements that will arise from it are
factored in to the revenue budget.  The affordability of the recurring interest and
principal debt repayments are a significant part of the Council budget and changes to
interest rates can create unexpected budget pressures. When there is a pressure on
the revenue budget, this in turn can put a strain on decision making within the capital
programme. 
9.2 It is a statutory requirement under Section 93 of the Local Government Finance Act
1992 for the Council to produce a balanced budget.  The Act specifies that a local
authority must calculate its budget requirement for each financial year to include the
revenue costs incurred from capital financing decisions. The key objectives are to
ensure the capital investment plans of the Council are affordable, prudent and
sustainable. 
9.3 Given the upward trend on interest rates recently, the Council is carefully monitoring
the impact of current commitments and existing plans.  A review of the Council’s
capital plan has commenced.  Increased construction costs in recent years are also a
pressure for the capital plan and that translates into increased borrowing costs also. 
The Treasury Management Team, in partnership with the Council’s treasury advisors
Arlingclose, will continue to monitor closely the situation around interest rates and take
any necessary action on a day-to-day basis to avoid risk to the Council’s finances.  In
the longer term the Council’s approved Performance Indicator for the costs of
borrowing – cost of borrowing as a percentage of the Council’s net revenue budget –
will continue to be used as a litmus test for affordability. 
9.4 The Council has a revenue budget for debt charges and the increases in capital
expenditure between 2024/25 and 2033/34 means that the revenue debt budget needs
Page 18

Page 19

to be reviewed and increased.  Current assumptions in respect of the debt charges are
shown below along with optimistic and pessimistic scenarios:
• The capital expenditure in the mid-range is the approved capital programme.
Optimistic spend is 80% of this and assumes underspends rather than carry
forward to the following year. Pessimistic is a 2% overspend on the approved
plan.
• Interest rates for the scenarios are the 20 year Gilt forecast from Arlingclose as
at March 2024. These are different to the base rate and is tracked by the Public
Works Loans Board (PWLB) so are more reflective of the borrowing rates the
Council would get.
• Prudential borrowing levels are based on the capital expenditure of each
scenario less the funding from capital grant and receipts. The loans charges
are based on these borrowing requirements. 
Optimistic Mid-range Pessimistic
Assumption 80% of Capital
Plan 
+2% of Capital
Plan
Year 1 – Loans Pool Rate
4.6%
Prudential Borrowing
Inc/(dec) in Loans
Charges 
£39.981m
£2.839m 
£49.976m
£3.548m 
£54.326m
£3.857m
Year 2 – Loans Pool Rate
4.25%
Prudential Borrowing
Inc/(dec) in Loans
Charges 
£31.394m
£2.119m 
£42.971m
£2.901m 
£44.129m
£2.979m
Year 3 – Loans Pool Rate
4.20%
Prudential Borrowing
Inc/(dec) in Loans
Charges 
£19.007m
£1.273m 
£27.952m
£1.873m 
£28.847m
£1.933m
Year 4 - 10 – Loans Pool
Rate 4.20%
Prudential Borrowing
Inc/(dec) in Loans
Charges 
£32.136m -
£8.091m
£2.153m -
£0.542m 
£44.045m -
£12.668m
£2.951m -
£0.849m 
£45.236m -
£13.126
£3.031m -
£0.879m 
9.5 The Capital Plan is being reviewed and following that review, which is intended
to be reported to Council in December, this section of the report will be updated
and a revised report brought to Council prior to the budget being set, along with
any other amendments for changes in assumptions. 
10. Cost Pressures/Risks 
Additional Financial Risks 
10.1 There are several additional financial risks that cannot currently be quantified or
classed as budget pressures, therefore they are categorised as risks that may or may
not materialise during the period of time which the strategy covers.  If and when this
Page 19

Page 20

happens, officers will update the financial assumptions in the strategy and notify
members. At this present time, these financial risks include: 
• Moray Integration Joint Board (MIJB). The provision of health and social care is
delivered by NHS Grampian and the Moray Council under the direction of the
Moray Integration Joint Board (MIJB).  The Council has no direct control over
the strategic delivery of social care services and is currently liable for 37% of
any overspend on health and social care by MIJB.  Based on current levels of
expenditure and future predicted demographic changes, MIJB may overspend
on adult health and social care services.  This presents a significant risk for the
Council in terms of budget management.  Children’s Services have now also
been delegated to MIJB.  During 2023/24 financial responsibility for these sits
entirely with the Council as specified in the revised Scheme of Integration.. 
Moving forward this will become part of the MIJB financial envelope and this
will increase the proportion of funding provided by Moray Council to MIJB and
thus the percentage by which the Council will be liable to fund any MIJB
overspend.
• There is a growing demand for Additional Support within Early Years and
school settings.  The Council has allocated additional funding to this area – this
may prove insufficient; some funding is one-off – this may require to be
converted to recurring funding.
• The Council budgets for a mild winter in terms of winter maintenance but the
actual cost will be higher if weather conditions are poorer.
• Other demand-led expenditure will vary according to the need for a particular
service and can depend on social and economic factors at set points in time. 
For example, homelessness and the need for temporary accommodation must
be managed within the service budget allocated yet are subject to
unpredictable demand when linked to social and economic factors.
• The affordability of the capital plan and borrowing, particularly given forecast
reductions in capital grant funding per the SG MTFS.
• A reduction in the Council’s general revenue grant allocation, if demographic
forecasts are accurate and affect the future allocation, as Moray’s under 16
population is currently forecast to be decreasing at a greater rate than the
Scottish average.. 
10.2 This medium to long term strategy includes known service specific cost pressures,
either existing or anticipated to be new burdens.  Other risks in the environment in
which the Council operates are noted as above and any other emerging risks will be
kept under review as part of the medium to long term financial planning process. 
Identification of these risks, monitoring and where possible mitigating them form part of
the unquantifiable input into the financial planning process. 
11. Participatory Budgeting 
11.1 Participatory Budgeting (PB) is a democratic process in which members of the
community decide how to spend part of a public budget. It gives the public influence in
the decision-making over Council finances. 
11.2 Scottish Local Authorities and the Scottish Government have a framework agreement
with a target where at least 1% of Council budgets will be subject to PB.  Currently the
Council are actively engaged in a wide variety of PB projects and making every effort
Page 20

Page 21

to reach the target, however, actual amounts allocated through PB fall far short of the
target. 
11.3 PB goes above and beyond budget consultations and requires facilitation between the
sponsor (Council) to ensure openness and transparency and a vote on the actual
outcome to determine that outcome. 
11.4 The benefits of Participatory Budgeting are perceived to be:
• Improved democratic process
• Improved public awareness and understanding of the Council
• Strengthens the relationship between the community and the Council 
11.5 There are also risks with PB:
• Unrealistic expectations from the community if not properly facilitated
• Limited scope where restrictions on budgets
• Needs public buy-in
• Voting risks (excluding minority or hard to reach groups)
• Very time consuming and requires significant officer input 
11.6 An update to the Community Empowerment Act is expected and this will give direction
as to future PB activity, along with other forms of community engagement. 
12. Demographics 
12.1 Population changes vary across Scotland, and between council areas from one year to
the next. The National Records of Scotland most recent population estimates report
(Mid-2021 Population Estimates, Scotland) 
12.2 The population of Scotland has been increasing every year for the last 20 years and is
projected to continue rising until around mid-2033 before beginning a gradual decline
over the following two decades.  Population change is driven by two main factors:
natural change (number of births minus the number of deaths) and net migration (the
number of people moving into an area minus the number of people leaving). 
Scotland’s population is projected to age with an increase in the number of people
aged 65 and over set to grow, while the number of children is projected to fall sharply,
compared to those aged 16-64 only expected to fall slightly. 
12.3 In Moray, the population grew by 10.8% from 2001 to 2021, with an increase of 0.7%
in the one year to June 2021.  The population is currently expected to decrease by
0.1% in the 10 year period between 2018 and 2028.  Moray’s population is ageing,
with life expectancy and healthy life expectancy for both men and women above the
Scottish average.  The age structure of the population in Moray in mid-2021 was: 0-15
years 17%, 16-64 years 61% and 65 years and over 22%.  The percentage change in
each of those age groups from ten years previous, in mid-2011, were: 0-15 years -6%,
16-64 years 0% and 65 years and over +24%.  This trend indicates a reducing number
of children with an even greater level of ageing population settling in Moray.  Between
2018 and 2028 the age group 90 years and over is projected to see a +50.9%
increase.  The number of households in Moray has increased by 22.7% since 2001, at
a more rapid change than the Scotland level for the same period (+16.2%).  The level
is projected to increase even further by 4.9% up to 2028, the same as Scotland as a
Page 21

Page 22

whole.  Likewise, the number of dwellings had steadily increased in the period from
2001 to 2022.  In Moray, Council Tax band A was most common (25.6%) in 2022,
followed by Council tax band B (22.7%), with Council Tax band H the least common
(0.2%). (Source National Records of Scotland, Household Estimates, July 2022) 
12.4 These projections will be updated based on the 2022 census during 2024. 
12.5 Primary and secondary school rolls are projecting to increase in the short term, with a
slight decrease in the interim period 2027 and 2028.  This will impact on demand for
services and also on grant support from Scottish Government under the present
method of allocating general revenue grant. (data from the School Census data,
September 2022 – due to be updated for September 2023 figures and will be
published towards the end of this calendar year and updated annually) 
12.6 A significant element of Scottish Government grant funding allocated through Grant
Aided Expenditure (GAE).  GAE uses statistical measures to apportion funding across
local authorities.  Over 30% of GAE is linked to the number of school pupils in primary
and secondary education.  A further 15% is linked to population, either of a certain age
group, working age population or the total population.  The impact of demographic
changes; migration, population growth may lead to funding changes for specific
services particularly Education, and will fall within the timescale of this strategy.  When
population projections are updated in 2024 these will be reviewed to estimate the likely
impact on income for the Council and to assist in financial planning for services likely
to be impacted by changing population numbers. 
13. Other revenue-raising methods 
Charging for Services 
13.1 Under the Council’s Charging for Services Policy, an annual revision of charges is
required and charges within the control of the council are generally inflated annually. 
A default freeze of charges was approved for 2022/23 at 2021/22 levels.  When setting
Charges services should consider the scope for full cost recovery, with benchmarking
against other local authorities a good test of reasonableness.  It is intended to bring
forward proposals in December 2023 to apply a multi year approach.   
13.2 Not all charges are within the Council’s control, some are levied by statute and are
excluded from the scenarios below. 
13.3 Charging for discretionary services with a flat rate increase could generate additional
income, assuming the demand is still there for the service. It is accepted that there will
be an element of decline in the demand for services if the charges are increased too
much. Assumptions used are:
• Optimistic – 10%
• Mid-range – 5%
• Pessimistic – 2% 
Optimistic Mid-range Pessimistic
Assumption 10% 5% 2%
Year 1 £0.216m £0.108m £0.043m
Page 22

Page 23

Year 2 £0.238m £0.114m £0.044m
Year 3 £0.262m £0.119m £0.045m
Year 4-10 £0.288m - £0.510m £0.125m - £0.168m £0.046m - £0.052m 
Page 23

Page 24

14 Key assumptions within the financial strategy
14.1  The impact of all the main assumptions listed above and the different scenarios outlined are summarised below.  The actions to balance
2024/25 and 2025/26 are driven by the Short to Medium Term Financial Strategy and are included here as illustrative information only.  The
main consideration within the Short to Medium Term Financial Strategy has been to remove the structural deficit.  On the assumption that this
has been achieved, the table below identifies the main influences on the budget from 2026/27 going forward .  The key consideration for the
Medium to Long Term is that from 2026/27 onwards a budget gap of £5 million on average is anticipated to be created by inflationary pressures
and the cost of borrowing, even after increase in Council Tax and charges for services.  This Strategy therefore identifies how that ongoing gap
could be bridged. 
Note 2024/25 2025/26 2026/27 2027/28 – 2033/34
Pay Award (all staff, average %) 1 2% - £3.840m
3% - £5.760m
4% - £7.680m
£3.917m
£5.932m
£7.987m
£3.995m
£6.110m
£8.306m
£4.075m - £4.589m
£6.294m - £7.515m
£8.638m - £10.930m
Contract inflation – general 2 Opt – Mid-1% £0.510m
Mid CPI+2% - £0.610m
Pess – Mid+1% £0.710m
£0.168m
£0.276m
£0.386m
£0.107m
£0.218m
£0.333m
£0.191m - £0.227m
£0.303m - £0.234m
£0.420m - £0.369m
Contract inflation - Energy (tariff
changes)
3 Opt – Mid-4% £0.121m
Mid CPI+2% - £0.353m
Pess – Mid+4% £0.584m
(£0.083m)
£0.160m
£0.420m
(£0.116m)
£0.126m
£0.407m
(£0.068m) – (£0.104m)
£0.180m - £0.148m
£0.489m - £0.627m
Contract inflation – PPP 4 Opt – Mid-1% £0.620m
Mid CPI+2% - £0.704m
Pess – Mid+1% £0.788m
£0.198m
£0.291m
£0.385m
£0.184m
£0.281m
£0.382m
£0.291m - £0.224m
£0.396m - £0.238m
£0.507m - £0.389m
Loans Charges - borrowing for
capital programme 
Opt – £2.839m
Mid – £3.548m
Pess - £3.857m
£2.119m
£2.901m
£2.979m
£1.273m
£1.873m
£1.933m
£2.153m - £0.542m
£2.951m - £0.849m
£3.031m - £0.879m
Council Tax (rate)  2% - £1.402m
5% - £2.877m
10% - £5.335m
CPI - £0.714m
£1.339m
£2.940m
£5.806m
£0.323m
£1.374m
£3.107m
£6.428m
£0.726m
£1.411m - £1.650m
£3.283m – £4.572m
£7.117m - £13.105m
£1.195m - £1.572m
Government Grant core funding 5 +2% - £3.88m
+1%/flat cash - £1.94m
-1% - (£1.94m)
£3.96m
£0
(£1.92m)
£4.04m
£0
(£1.90m)
£4.12m - £4.64m
£0
(£1.88m) – (£1.77m)
Page 24

Page 25

Note 2024/25 2025/26 2026/27 2027/28 – 2033/34
Income – discretionary charges  2% - £0.043m
5% - £0.108m
10% - £0.216m
£0.044m
£0.114m
£0.238m
£0.045m
£0.119m
£0.262m
£0.046m - £0.052m
£0.125m - £0.168m
£0.288m – £0.510m            
BUDGET GAP – Mid Case
Scenario
6 £6.050m £6.476m £5.382m £6.716m - £4.244m 
Note 1 – pay awards in recent years have been on a scale and capped at a limit for higher earners/Chief Officers. The methodology for
calculating the impact of the assumptions has been done using an average position in light of previous year’s averages.
Note 2 – this sum is allocated to a range of uplifts including School/community transportation, Children’s Services and Waste contracts and
fees.
Note 3 – Future years figures remain subject to considerable variations, given the moves within the Smarter Working policy, and possible
reduction of office space, but until these are realised the current inflation assumptions have been based on 2022/23 full year consumptions.
Note 4 – the level of uplift applicable to the Council’s PPP contract is RPI index rate in the February of the preceding financial year. 
Note 5 – General Revenue Grant and Non-Domestic Rates 
Note 6 – 2024/25 and 2025/26 budget gap already encompassed in Short to Medium Term Financial Strategy workings. 
Page 25

Page 26

15 Transformation / Council of the Future 
15.1 Work has commenced on identifying and developing a future operating model for the Council aligned with the shared priorities set out in
the Verity House Agreement and  looking forward to delivery of Council priorities within a sustainable balanced revenue budget and an
affordable capital plan.  Various models have been given preliminary scrutiny.  The models themselves are unlikely to deliver financial savings
but will help to determine where and how the Council invests in the change programme. 
15.2  Looking forward beyond the current Improvement and Modernisation Programme (IMP), to areas of work which could deliver a
financially more sustainable Council, the following are being scoped:
Asset Management
15.3 Various strands of work are encompassed under this theme.  The Smarter Working project is already in delivery.  The Depot review is at
Outline Business Case stage.  At this stage potential revenue savings of £200,000 to £400,000 have been provisionally estimated.  The
strategic review of the Learning Estate has commenced and again has potential to result in reduced running costs.  With further investment
there is scope to accelerate the pace of this review.  Part of the Route Map to Net Zero involves a reduction is the Council’s energy use. 
Preliminary estimates are for financial savings of £100,000 to £200,000 resulting from this.  Development work will also be progressed on
generating income from renewables and options to reduce costs through a Property Asset Trust.  A desktop review of the Council’s asset base
will form part of the review of the capital plan.  As can be seen from the table at 14.1 a significant element of the budget gap is generated from
planned capital spend.  In common with other local authorities the Council needs to reduce its planned capital spend.  This needs to be
followed up by service reviews to determine the pattern of service delivery from a reduced asset base.  A combination of reduced capital spend
and a reduced asset base has the potential to reduce costs to the order of £1,000,000.
Place Based Approach
15.4 In considering what the Council’s future asset base might look like, consideration must be given to the optimal basis on which to meet
place based needs and other sources of service support including through partner organisations and services delivered by communities
themselves.  The rural nature and geography of Moray requires to be factored into the distribution of service bases in order to meet the needs
of Moray’s population.  This is an emerging aspect of the Transformation Programme.  Future distribution of service bases will be reviewed
taking account of factors such as operating cost, local population, service usage, travel (time/distance), geography (ease of access)and asset
condition.  In some cases a service base may not be proposed in every area where residents can access that service in a neighbouring or
central area.
Page 26

Page 27

Service redesign / review of processes
15.5 A Lean review of processes has been part of IMP2 for some time but work has been delayed.  This needs to be progressed to facilitate
digitisation of Council processes.  Lean as a tool in itself and as a facilitator for digitisation is anticipated to generate significant savings.  Linked
to such a micro review of service delivery needs to be a macro review, considering management and governance arrangements, to ensure a
more streamlined approach.  Estimated savings are included in the current financial plan at £250,000 and since those savings were estimated
further areas for consideration have been identified.
15.6 As can be seen from the table at paragraph 14.1 the biggest single contributor to the projected future budget gap is from pay awards. 
Service redesign resulting in a streamlined council with consequent reduced head count over time will mitigate this pressure. 
Demographics 
15.7 As the Council reviews its asset base and likely demand for services it needs to use the best available information on demographic
projections to predict the demand for services and to identify what a strategic asset base for different asset types would be to serve the future
needs of the communities in Moray.  Shrinking population numbers – eg of under 16s – should imply a reduced demand for services and if
grant support is reduced then service reduction is imperative.  Growing population numbers eg over 65 dictate a need to review how services
are delivered as it is not sustainable in terms of financial cost or ability to recruit staff to continue to expand services on the current model.  As
these services are delegated to MIJB this will not form part of the detailed planning which the Council undertakes, however, Council services
may be called upon to facilitate service redesign e.g. use of digital tools.
15.8 In parallel to the work being carried out under the Short to Medium Term Financial Plan, investment in the three strands of work
identified in paragraphs 15.3 to 15.7 above needs to be made so that work can commence in order that savings become available to support
the budget from 2026/27 onwards. 
16 Conclusion
16.1 The Medium to Long Term Financial Strategy for a financially sustainable Council is to take work along three main strands of service
development.
16.2 The Council will take a strategic approach to asset management, seeking to develop a strategically located asset base using a Place
Based Approach to serve local communities from energy efficient facilities.
Page 27

Page 28

16.3 The Council will aim to be a more streamlined organisation, using recognised techniques to improve efficiency and taking advantage of
technology to support service delivery.
16.4 The Council will seek to future proof its services, using the most up-to-date information of population to inform planning for future
service delivery.
16.5 Work is on-going to develop workstreams to support the Council of the Future and reports will be brought to members as plans are
developed.  As approval is given for these developments the Medium to Long Tern Financial Strategy will be updated to appropriately reflect
them.
Page 28

Page 29

REPORT TO: SPECIAL MORAY COUNCIL ON 25 OCTOBER 2023 
SUBJECT: CLODDACH BRIDGE 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform Council of the findings of the Pre-feasibility Study undertaken on the
potential repair of Cloddach Bridge. 
1.2 This report is submitted to Council in terms of Section III (F) (15) of the
Council's Scheme of Administration relating to management and
implementation of the requirements of the Roads (Scotland) Act 1984. 
2. RECOMMENDATION 
2.1  It is recommended that Council 
(i) notes the findings of the pre-feasibility study; and 
(ii) agrees that a full business case for the repair of Cloddach Bridge
should not be funded, as this work is contrary to the decision of
Economic Development and Infrastructure Services Committee on
7 February 2023 (para 11 of the minute refers) and does not
comply with the Council policy on Bridge Maintenance
Prioritisation.   
3. BACKGROUND 
3.1 On 2 May 2023, the Economic Development and Infrastructure Services
Committee approved the Council’s Policy on Bridge Maintenance
Prioritisation, (paragraph 12 of the minute refers).  The policy sets out the
procedure for prioritising bridge maintenance works, which is based on the
condition of each bridge and its network criticality.  Network criticality is split
into three categories, Vital, Important and Standard.  As a significant
percentage of the Council’s bridge stock is classed as Standard, this category
has been sub-categorised into Standard – high, medium and low. Cloddach
Bridge is categorised as Standard – low.  The full prioritisation list was
previously provided as Appendix A to the Cloddach Bridge report to Moray
Council on 4 October – it can be found here.
Item 6b.
Page 29

Page 30

3.2 Cloddach Bridge was built in 1905 with an estimated design-life of between
100 and 120 years, after which it would require significant refurbishment or
replacement. This bridge is located on the C2E road and a traffic survey
undertaken in 2020 showed the average number of vehicles crossing the
bridge each day was less than 800. 
3.3 Based on the findings of a Special Inspection undertaken in February 2022,
Cloddach Bridge was closed to vehicular traffic in the interest of public safety. 
The condition of the bridge was confirmed in the findings of a Principal
Inspection and Structural Assessment undertaken by an independent
structural engineer in March 2022. 
3.4 On 7 February the Economic Development and Infrastructure Services
Committee (paragraph 11 of the minute refers) agreed to; 
(i) keep Cloddach Bridge closed to vehicular traffic but open to
pedestrians and cyclists with regular inspections to monitor the
condition of the bridge;  
(ii) when the bridge condition deteriorates further and it is not safe for any
user, this route is closed permanently and the bridge is removed; and
(iii) To note the Chair’s commitment, in conjunction with his Group, to
pursue alternative funding sources with a view to keeping Cloddach
Bridge open. 
3.5 On 15 March 2023, the UK Government announced £1,500,000 grant funding
for the repair of Cloddach Bridge, which is available subject to a business
case and match funding of 50%. 
3.6 Officers have been in consultation with officials from the Department for
Transport, which has been appointed as the lead agency from UK
Government, regarding the terms and conditions of the grant funding.  These
conditions are listed below. 
1. The grant funding available is to provide vehicular access. No weight
threshold is specified.
2. This funding is up to a maximum of £1,500,000 and is subject to 50%
match funding being provided.
3. A Full Business Case (FBC) must be submitted to secure the grant
funding.
4. No funding is available from the UK treasury to develop the business
case.
5. The grant will be limited to the amount stated in the business case, i.e.
the UK Government will not underwrite any risk that costs associated
with the bridge works exceed £3m. 
3.7 At a meeting of Moray Council on 28 June 2023 the Council agreed to
commission and fund a Pre-feasibility Study to ascertain if investment in a
FBC, as required to secure the UK government grant funding to repair the
bridge, would be of value (paragraph 8 of the minute refers). 
The Pre-Feasibility Options
3.8 The Pre-feasibility Study considered 4 options to reopen the bridge to
vehicular traffic.  Details of these options are provided below, full details are
Page 30

Page 31

provided in Appendix B.  The consultant has estimated the capital cost of
each option using average construction costs for the UK and adding Optimism
Bias.  The costs provided considered the lower range, most likely and upper
range costs.  These costs have been tested using one of the Council’s
framework contractors and the upper range cost is considered to be closest to
current market prices.  However, these costs will need to be further defined as
part of the FBC, including quantified risks and should be treated with caution. 
3.9 Option 1 Do Minimum – this option would maintain the current status of the
bridge, which is closed to vehicular traffic but open to pedestrians and cyclists
and provides a baseline case for comparison with other options.  The bridge
would be monitored to assess its condition and suitability for continued use by
pedestrians and cyclists.  It is likely that after 5 to 10 years the bridge would
need to be fully closed and thereafter demolished. The cost of demolition,
ongoing monitoring and minor maintenance works is included in the whole life
cost for this option.  The whole life costs for options that do not involve
demolition of the bridge allow for ongoing monitoring and maintenance
required throughout the serviceable life of the structure.  A long term road
closure would be required for this option, with ancillary works such as signage
and turning facilities for motor vehicles. 
Capital Cost Whole Life Cost Total Cost
£83,000 £747,078 £830,078 
3.10 Option 2 Repairs to existing bridge – this option would fully refurbish the
existing bridge, including breakout and replacement of existing elements. 
There is significant amount of risk associated with this option.  The condition
of the existing structural elements is not fully known, so the extent to which
they can be retained or strengthened is also unknown. 
Capital Cost Whole Life Cost Total Cost
£3,957,378 £309,208 £4,266,586 
3.11 Option 3 Overbridge – this option retains the existing structure with a pre-
fabricated structure installed over the existing deck.  The overbridge can
either span the top of the existing abutments to rest on new supports or be
installed onto the existing foundations in combination with repair works or
modifications to the existing abutments. Overall the maintenance
requirements for this type of bridge are higher than would be required for a
new integral structure.  The level of ongoing maintenance will depend on
which of these options is constructed and this has been allowed for in the
estimated costs. 
Option Capital Cost Whole Life Cost Total Cost
4 a) demolish
substructure 
£3,677,494 £279,208 £3,956,702
4 b) re-use
substructure 
£3,337,022 £309,208 £3,646,230 
3.12 Option 4 New Integral Structure – this option would involve full demolition of
the existing structure and construction of a new bridge.  This option would
require significantly less ongoing maintenance than the other options
considered to open the bridge to vehicular traffic.  The consultant has
Page 31

Page 32

considered two factors when costing this option, a minimised width of bridge
and an improved width of bridge. The minimised bridge would allow passage
of one standard sized vehicle up to 40 tonnes at a time, agricultural vehicle in
excess of 3.5m wide would not be able to use this bridge safely.  The
improved width of bridge would allow two way traffic for standard size
vehicles. 
Option Capital Cost Whole Life Cost Total Cost
4 a) wider
bridge
£3,514,804 £84,850 £3,599.654
45 b) minimum
width bridge
£2,868,375 £84,850 £2,953,225 
Socio-Economic Benefits and BCR(Benefit Cost Ratio)
3.13 The socio-economic benefits associated with reopening the bridge to
vehicular traffic cannot be defined at this time as there is insufficient data to
inform this assessment.  Should members decide to progress a FBC, the
traffic surveys and traffic modelling proposed as part of the FBC development
will be sufficient to clearly define these benefits.  Specific socio-economic
benefits or a BCR are not used within the bridge prioritisation policy, they are
however used by government to determine the value of investing in particular
schemes. 
3.14 While specific socio-economic benefits cannot be calculated at this time, it is
clear that, assuming a capital cost in the region of £3million, the value of
socio-economic benefits would need to be greater than £50,000 per year to
result in a BCR of greater than 1. The indicative number of vehicles and
potential for benefit in journey time is highly likely to result in benefits of
greater than this number.  Therefore, while there would be a positive business
case at this level of capital spend (noting the caveats on this above), there are
too many unknowns to provide a definitive BCR with confidence at this stage. 
The decision of Economic Development and Infrastructure Services
Committee on 7 February 2023 was for Cloddach Bridge to remain closed to
vehicular traffic and if the recommendation in Section 3.1 (ii) of this report is
accepted this decision will be adhered to. Should members choose to support
the preparation of a FBC, the option then likely to be preferred would be
Option 4b, new integral bridge with minimum width.       
Costs and Timeline to Develop FBC
3.15 The pre-feasibility study provides an estimate of the costs involved in
developing a FBC to repair the bridge and how long this is likely to take.  The
estimated cost of developing the FBC is £187,000 and it is estimated it will
take 26 weeks to complete.  To achieve this submission date the contract will
need to be awarded directly through one of the Council’s frameworks.
Although this appears a lengthy process it is necessary to carry out traffic
modelling to accurately assess the benefits of reopening the bridge to
vehicular traffic.  It is also necessary to undertake intrusive surveys and
outline design to reduce risk and assess costs as accurately as possible at
this early stage of the project. 
3.16 The DfT will need to review and approve the FBC prior to any draw down of
funding. If the FBC does not establish a case to the satisfaction of the DfT in
terms of value for money then the case may be referred to a member of the
Page 32

Page 33

ministerial team to consider whether a Ministerial Directive would be issued on
other strategic grounds. The DfT has extended its original deadline from April
to early July 2024, to allow the council more time to develop the business
case.   To achieve timely approval the FBC would need to be submitted to DfT
by early April 2024. This is to enable the DfT to review the FBC, prepare their
own papers, submit the case for review by the DfT’s investment board,
ministers and Treasury officials. The programme for development of the FBC
is 26 weeks. Deferring the decision on how to proceed with the FBC to 25
October 2023, allows only 23 weeks to deliver the FBC.  While it may be
possible to condense the programme, it cannot be guaranteed and
submission by the revised deadline may not be achieved.  Council should
consider this risk in reaching a decision.   
3.17 The business case would follow the five case model set out in the Green
Book, which includes the Financial Case.  The Financial Case must set out
how the bridge repair will be funded.  As such, the source of the 50% match
funding currently estimated at £1.45m required to construct the bridge will
need to be identified before submission of the FBC. It should be noted that
council officers are already looking to reduce the council’s capital
commitments going forward as they are unaffordable. 
Match Funding
3.18 A meeting was held with Heldon Community Council on 2 August 2023, to
discuss progress and funding required to repair Cloddach Bridge.  Heldon
Community Council has advised it intends to submit an application for funding
to the Fred. Olsen Renewables Rothes 1- fund. The closing date for
applications was 3 October and the application will be considered on 17
October.  The level of funding, if any, that would be made available from this
source will not be known until after 17 October, although it should be noted
that the Community Council has already indicated that any funding is likely to
be partial rather than full match funding.  The Community Council also intends
to petition Scottish Government to explore potential funding streams from this
source. 
3.19 At a meeting of Moray Council on 27 September 2023, members agreed to
defer a decision on Cloddach Bridge until 25 October 2023, to give the
community time to get feedback from the Fred Olsen Renewables Rothes 1 –
Fund and for members to get feedback from Scottish Government and UK
Government on whether additional funding would be made available.  At the
time of writing this report the potential for funding to develop the FBC and
match fund the construction costs was not known but a response to the
enquiry with the Scottish Government as to funding has been received which
confirms that no funding will be available from the Scottish Government for
this project. 
Summary 
3.20 In summary, should there be a decision to proceed further, the process would
be as follows: 
a. preparation of FBC – including identification of match funding
b. submission of FBC to DfT for approval by early April 2024, if possible,
noting that due to the sequential nature of elements of the FBC there is a
risk the programme cannot be condensed into 23 weeks.
Page 33

Page 34

c. If FBC demonstrates a positive BCR, approval of FBC for funding
drawdown is within the remit of the DfT
d. If FBC does not demonstrate a positive BCR the case may be referred for
a ministerial direction to approve funding
e. drawdown of funding on agreed terms with DfT in line with delivery of
project 
3.21 Notwithstanding the information set out above in this report, and the concern 
of local residents, it remains the case that there is already a standing Council 
decision to close Cloddach Bridge to vehicular traffic. The council has also 
approved the prioritisation policy that determines the order in which these
bridges are brought forward for funding and Cloddach bridge is classified as
standard – low, meaning that notwithstanding other financial pressures on the
council there are a significant number of other bridges in Moray that have a
higher funding priority for the council. These bridges are brought forward in a
managed way each year for inclusion in the capital budget to enable an
affordable and deliverable programme of works to maintain network bridges
across Moray. 
3.22 If work to progress a FBC and construct a new bridge at Cloddach is
progressed it will impact on the programme of work for 23/24 and 24/25 as
internal capacity will be required to support the project notwithstanding 
outsourcing as much as possible.  Management of the contract for the FBC
will require input from a senior engineer, which will take time away from
progressing the Garmouth Adaptation Plan and the Surface Water
Management Plans for Forres and it is likely that progress on these projects
will be delayed. 
3.23 If construction of a new bridge at Cloddach is progressed this will require one
of the projects planned for 24/25 to be deferred.  There are maintenance
works to three projects planned for 24/25 at Auchriachan Bridge, Blackhills
Culvert and New Bishopmill Bridge.  Auchriachan Bridge is categorised as
important and is in poor condition.  This bridge currently has a temporary
repair, which was undertaken as emergency works and there are concerns
that if a more robust repair is not undertaken soon it may be necessary to
close the bridge to vehicular traffic, with a diversion route of approximately 20
miles.   
3.24 Blackhills Culvert is categorised as important and is in very poor condition. 
This culvert provides sole access to property.  New Bishopmill Bridge is
categorised as vital and is in poor condition with a collapsed bearing.  It is
unlikely that its condition would require the bridge to be closed in the near
future but if this changes there is a reasonably short diversion route available. 
As such the planned maintenance work to New Bishopmill Bridge would be
deferred.  It is also likely that officers would need to outsource a number of the
Principal Inspections planned for 24/25 to consultants, at increased cost to the
council.   
4  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
“Building a better future for our children and young people in Moray”
Page 34

Page 35

(b) Policy and Legal
In policy terms Cloddach Bridge is classed as Standard: Low in terms of
its priority level. In terms of the Short to Mdeium term Financial Strategy
also on the agenda for this meeting (item 8), reducing the Capital Plan is
a key contributor to achieving a balanced budget by the end of 2025/26. 
(c) Financial implications
There is no committed budget to fund a FBC or undertake works on
Cloddach Bridge. It is noted that Council on 28 June 2023 (para 10 of
the minute refers) carried forward £1.5m capital from the 22/23 capital
budget into 23/24 provisionally in relation to Cloddach Bridge, but
agreeing that any firm commitment would be subject to further decision
making. As set out in para 4.20 and 4.21 above and in the risk
implications below, given the other calls on council funding and the
requirement to make significant financial savings for 2024/25 and
2025/26 there are clear financial impacts in committing funding to this
project. 
When the Council approved the budget for 2022/23 on 22 February
2022 (paragraph 3 of the Minute refers) it balanced only by using
reserves and one-off financial flexibilities. The indicative 3 year budget
showed a likely requirement to continue to make savings in the order of
£20 million in the next two years, revised to £15m in September 2023.  
All financial decisions must be made in this context and only essential
additional expenditure should be agreed in the course of the year.  In
making this determination the committee should consider whether the
financial risk to the Council of incurring additional expenditure outweighs
the risk to the Council of not incurring that expenditure, as set out in the
risk section. 
(d) Risk Implications
The pre-feasibility study has indicated that there would be a positive
BCR to fund the repair works required to re-open Cloddach Bridge to
vehicular traffic. However, this cannot be confirmed until further traffic
survey and modelling work has been undertaken to define the benfits
reopening the bridge would provide.  Officials from the Department of
Transport have indicated that the grant funding could be made available
through a Ministerial Directive if there is no positive benefit cost ratio
(based on socio-economic benefits).  However, this is not guaranteed
and the funding required to deliver the business case could be abortive
spend.   
There is a risk that should it make funding available to support this
project notwithstanding the earlier decision in February this year, the
Council is seen as departing from its established Bridge Maintenance
Prioritisation Policy. While it could be suggested that the offer of
government funding makes this project exceptional, any funding
contributed by the Council would still be applied to a bridge which would
not otherwise be accorded priority status, and given the current projected
funding gap of £15m for 2024/25, this may ultimately be to the potential
detriment of other bridges and communities across Moray, particularly in
the context of a reducing Capital Plan.
Page 35

Page 36

As set out in para 3.16, should there be a decision to proceed with
developing the FBC there are risks in achieving a timely submission of
the FBC in order to achieve drawdown of funding, which could lead to
abortive expenditure. 
(e) Staffing Implications
There are no staff resources available within the Consultancy Section to
undertake the work required to deliver the business case.  As such this
work will need to be outsourced at a cost of approximately £187,000 
Some staff time would be required to manage the contract for the
business case and this is likely to impact on the Consultancy Team’s
delivery of its revenue programme for 2023/24. If the FBC and
construction of a new bridge at Cloddach is progressed it will have an
impact on planned work, as set out in paragraph 3.22 of this report. 
(f) Property
Cloddach Bridge currently vests with Moray Council in its role as Road
Authority. If the bridge is closed and the road is Stopped Up, the land on
which is has been constructed must be reinstated and returned to the
landowner. 
(g) Equalities/Socio Economic Impact
If the bridge remains closed to vehicular traffic, a maximum diversion of
6 miles may affect some car users. 
(h) Climate Change and Biodiversity Impacts
Where possible we would seek to recycle and / or reuse the waste
material generated through demolition of the existing bridge. 
(i) Consultations
Depute Chief Executive (Economy Environment and Finance), Head of
Environmental and Commercial Services, Chief Financial Officer, Legal
Services Manager, Equal Opportunities Officer and the Democratic
Services Manager have been consulted and their comments
incorporated into the report. 
5. CONCLUSION 
5.1 A decision not to progress works on Cloddach Bridge was made by 
Economic Development and Infrastructure Services Committee on 7 
February 2023. 
5.2 To receive grant funding from DfT to repair Cloddach Bridge the Council
must submit a FBC, which should demonstrate value for money and
must identify how the match funding of £1,434,187 will be sourced. 
5.3 It is likely that a positive BCR can be achieved over the serviceable life
of the new bridge but this cannot be confirmed until traffic survey and
modelling work is undertaken during development of the FBC. 
5.4 A commitment to progress with development of a FBC given the
Council’s stated policy positions, uncertain match funding, extremely
Page 36

Page 37

challenging timescales and impact on existing priorities is not
recommended given the risks which this would present for the Council. 
Author of Report:  Debbie Halliday Consultancy Manager 