Moray Council 
Wednesday, 26 June 2024 
SUPPLEMENTARY AGENDA 
The undernoted reports have been added to the Agenda for the meeting of the
Moray Council to be held at Council Chambers, Council Office, High Street,
Elgin, IV30 1BX on Wednesday, 26 June 2024 at 09:30. 
BUSINESS 
8a) Unaudited Annual Accounts for 2023-24
Report by Depute Chief Executive (Economy, Environment and
Finance)  
3 - 134 
17 Long Term Town Fund - Elgin Town Board Update [Para
8]
• 8. Information on the amount of any expenditure proposed to be
incurred by the Authority; 
Page 1

Page 2

Page 2

Page 3

REPORT TO: MORAY COUNCIL ON 26 JUNE 2024 
SUBJECT: UNAUDITED ANNUAL ACCOUNTS FOR 2023/24 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 The Council is asked to consider the unaudited Annual Accounts for the year
to 31 March 2024 for both Moray Council and the Connected Charity Trust
Funds administered by the Council. 
2. RECOMMENDATION 
2.1 It is recommended that Council considers and notes the:- 
(i) unaudited Annual Accounts for Moray Council for the year ended
31 March 2024; and 
(ii) Moray Council Connected Charity Trust Funds Trustees’ Report
and Financial Statements for the year ended 31 March 2024.   
3. BACKGROUND 
3.1 The unaudited Accounts for 2023/24 for the Council and for the Connected
Charity Trust Funds administered by Moray Council are available as separate
documents on the agenda.  These documents will be posted to the Council’s
website after this meeting. 
Moray Council Annual Accounts 
3.2 These accounts are prepared in accordance with the Code of Practice on
Local Authority Accounting in the United Kingdom 2020/21 (the Code) which
is underpinned by International Financial Reporting Standards (IFRS).  They
summarise the Council’s financial transactions for the year to 31 March 2024. 
3.3 The regulations require the unaudited Annual Accounts to be presented to the
External Auditor by the 30 June and for the Council to consider by 31 August. 
Item 8a)
Page 3

Page 4

3.4 The Code requires the Council to set out a statement not only of its own
financial position but also of the financial position of all the entities or activities
for which the Council is responsible or in which it has a significant financial
interest.  These entities are encompassed in the Group Accounts, which are
included in the Annual Accounts.  The Group Accounts for 2023/24 include
Trust Funds and Common Good Funds as entities or activities for which the
Council is responsible and the Moray Integration Joint Board, Grampian
Valuation Joint Board and Moray Leisure Limited as associate bodies. 
3.5 There are four core Financial Statements: the Comprehensive Income and
Expenditure Statement, the Movement in Reserves Statement, the Balance
Sheet and the Cash Flow Statement.  Of these, the Statements most likely to
be of interest to most users of the accounts are the Comprehensive Income
and Expenditure Statement and the Movement in Reserves Statement. 
3.6 The Comprehensive Income and Expenditure Statement expresses the
income and expenditure of the council over the past financial year in a format
which complies with International Financial Reporting Standards.  This
includes entries relating to revaluation of assets and other entries which, by
statute, cannot be charged to the Council Tax payer. 
3.7 The Statement shows a surplus of £6.926 million, which includes a net
increase of £29.774 million for the revaluation of the Council’s assets plus an
increase for the re-measurement of the defined benefit asset of the Council’s
share of the North East of Scotland Pension Fund of £11.250 million. 
3.8 Removing these items leaves a deficit on the Provision of Services of £34.098
million. After adjustment for other items not chargeable to Council Tax or
Housing Rent payers (e.g. depreciation), this “book deficit” equates to a deficit
of £9.341 million. This is reflected in the Movement on Reserves Statement as
the increase in Usable Reserves.  Usable reserves accounting aligns with the
basis on which the Council sets its budgets.  They therefore show the direct
financial impact for the Council Tax payer and Council House tenant.   
3.9 The Movement on Reserves Statement shows the movement on the different
reserves held by the council, analysed into Unusable and Usable Reserves. 
3.10 Unusable Reserves arise from accounting entries required to comply with
International Financial Reporting Standards but which cannot impact on the
level of Council Tax or Council House Rent payable. Unusable reserves
increased by £16.267 million.
Page 4

Page 5

3.11 The net movement on the General Fund in 2023/24 was an overall decrease
of £4.374 million.  Note 11 to the Accounts shows an analysis of the General
Fund, which consists of a general service element (the free general reserve),
the Devolved School Management (DSM) balance and various ear-marked
and otherwise restricted funds, the most significant of which remains the ear-
marked working reserve, created in 2020/21 from Scottish Government
funding for the pandemic unspent at the year end, albeit the balance on this
has decreased significantly (by £14.176 million) during 2023/24.  In addition to
these the Council has, by exercising the flexibility to extend the period over
which service concessions are accounted for, created an additional ear-
marked reserve – the retrospective service concession reserve – which
stands at £7.526 million.  Unlike other usable reserves this reserve is not cash
backed. 
3.12 In setting the budget for 2023/24 the Council planned to use £17.850 million
from the working reserve.  This estimate was revised during the year to
£13.789 million and in the event £14.176 million was used.  The balance on
DSM carried forward to 2024/25 was £0.134 million less than that carried
forward into 2023/24.  Increasingly the Council is in receipt of funding which is
accounted for as general services income but required by the funder (usually
Scottish Government) to be spent on specific purposes.  To assist in tracking
this spend and for transparency a new set of ear-marked reserves was
created as at 31 March 2024.  The balance on these reserves stands at
£13.794 million.  The Council previously made the decision to set aside ear-
marked reserves for Transformation of services and other Council priorities
and the balances on these reserves as at 31 March 2024 stand at  £6.152
million and £7.134 million respectively. 
3.13 The Balance Sheet summarises the Council’s assets and liabilities as at 31
March 2024.  This includes pension liabilities falling due in future years, which
will be financed by pension contributions through the Council’s revenue
expenditure.  Council assets of £1,277.924 million are offset by liabilities of
£360.229 million, giving the council a net worth of £917.695 million, which
represents the total value of the Council’s usable and unusable reserves. 
3.14 The Cash Flow Statement shows the movement in cash and cash equivalent
during the financial year, a decrease of £1.090 million for 2023/24. 
Connected Charity Trust Funds Administered by the Council
3.15 All 26 councillors as trustees are responsible for preparing the Trustees'
Annual Report and the Financial Statements in accordance with applicable
law and regulations. The law applicable to charities in Scotland requires the
trustees to prepare financial statements for each financial year in accordance
with United Kingdom Generally Accepted Accounting Practice (United
Kingdom Accounting Standards and applicable law).The trustees must not
approve the financial statements unless they are satisfied that they give a true
and fair view of the state of affairs of the charity and of the incoming
resources and application of resources of the charity for that period. 
3.16 The financial statements for the Connected Charity Trust Funds have been
prepared under the historical cost convention as modified by the inclusion of
investments at fair value, in accordance with the Charities and Trustee
Page 5

Page 6

Investment (Scotland) Act 2005, the Charities Accounts (Scotland)
Regulations 2006 (as amended) and the principles of Accounting and
Reporting by Charities: Statement of Recommended Practice 2015 (FRS102)
commonly referred to as the SORP. 
3.17 In line with Regulation 7 of the 2006 Regulations, these financial statements
have been prepared on the basis that the trust funds for which it acts as sole
trustee are connected charities. As such, the accounts for these individual
charities have been prepared on a collective basis for the Council. 
3.18 Moray Council administers 8 Registered Charitable Trusts for which it is sole
trustee, with a total net worth at 31 March 2024 of £1.047 million (2023:
£1.016 million). 
3.19 Separate financial statements covering all the Council’s charitable trusts are
published on the council’s website. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The unaudited Annual Accounts have been completed within the target
timescale.   
(b) Policy and Legal
The Local Authority Accounts (Scotland) Regulations 2014 require a
Local Authority to submit a set of accounts to its External Auditor by 30
June. 
The Council’s accounts are prepared in accordance with the Code of
Practice on Local Authority Accounting in the United Kingdom 2020/21
which is underpinned by International Financial Reporting Standards. 
The Connected Charities unaudited financial statements comply with
the Charities and Trustee Investment (Scotland) Act 2005, the
Charities Accounts (Scotland) Regulations 2006 (as amended) and the
provisions of the trust deed. 
The Audited Accounts, together with a copy of the External Auditor’s
Report shall be laid before a meeting of the council in due course. 
(c) Financial Implications
The Annual Accounts provide extensive information about the Council
and its Connected Charity Trust Funds financial position at 31 March
2024. 
(d) Risk Implications
There are no risk issues arising directly from this report. The Annual
Accounts will be subjected to an audit by the council’s External
Auditors, Grant Thornton, who will provide assurance that the Accounts
for 2023/24 give a true and fair view of the financial position and
expenditure and income of the council and its group for the year.
Page 6

Page 7

Grant Thornton will also audit the Council’s Connected Charity Trust
Funds Trustees’ Report and Financial Statements and provide a report
to Members on their findings. 
(e) Staffing Implications 
Many staff throughout the council provide information for the inclusion
in the Annual Accounts.  The process begins before the end of March
each year and is only completed once the audit of the Accounts is
finalised in September. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
There are no equalities issues arising directly from this report. 
(h) Climate and Biodiversity Impact
There are no implications for climate or biodiversity arising from this
report. 
(i) Consultations 
Finalising the Accounts does not involve consultation, but many staff
throughout the Council are involved in providing information for
inclusion in the Accounts. 
5. CONCLUSION 
5.1 The unaudited Annual Accounts shows the Council’s financial position
as at 31 March 2024. The audited accounts for 2023/24 will be submitted
to a Council meeting in September 2024 along with any findings and
recommendations from our external auditors, Grant Thornton. 
Author of Report: Lorraine Paisey, Chief Financial Officer
Background Papers: 
Ref: LP/LJC/ SPMAN-1293228629-1091 
Page 7

Page 8

Page 8

Page 9

Moray Council Unaudited Annual Account 2022/23 
UNAUDITED ACCOUNTS 
ANNUAL ACCOUNTS FOR
THE YEAR ENDED 
31 MARCH 2023 
d
Item 8a)
Page 9

Page 10

Moray Council Unaudited Annual Account 2022/23 
If you need information from Moray Council in a different
language or format, such as Braille, audio tape or large print,
please contact: 
اذإ  متنك  يف  ةجاح  ىلإ  تامولعم  نم  لبق  سلجم   ياروم  نوكتو   ةغلب   ةفلتخم   ىلعوأ
لكش  فلتخم  لثم  ،ياربلا  ةناوطسأ  ويدوأ  وأ  نأ  نوكت  ةعوبطم  لامعتساب   فورح 
ةظيلغ ءاجّرلاف  لاصّتلإا  ب 
Jei pageidaujate tarnybos Moray tarybos teikiamą informaciją gauti kitokiu formatu,
pvz., Brailio raštu, garso įrašu ar stambiu šriftu, kreipkitės: 
Jeśli potrzebują Państwo informacji od Rady Okręgu Moray w innym formacie, takim
jak alfabet Braille'a, kasety audio lub druk dużą czcionką, prosimy o kontakt: 
Se necessitar de receber informações por parte do Concelho de Moray num formato
diferente, como Braille, cassete áudio ou letras grandes, contacte: 
Ja Jums vajadzīga informācija no Marejas domes (Moray Council) citā valodā
vai formātā, piemēram, Braila rakstā, audio lentā vai lielā drukā, sazinieties ar: 
ںوہ راکرد تامولعم ںیم تروص ای نابز رگید یسک ےس لسنوک ےروم وک پآرگا
لاثم˝ :ںیئامرف ہطبار رک امرف ینابرہم وت ،فورح ےڑب ای پیٹ ویڈآ ،ےلیرب 
Chief Financial Officer, High Street 
Elgin, IV30 1BX 
01343 563125    
accountancy.support@moray.gov.uk 
Page 10

Page 11

Moray Council Unaudited Annual Account 2022/23 
Contents
Management Commentary .................................................................................................................................................. 1
Statement of Responsibilities for the Annual Accounts ..................................................................................................... 19
Annual Governance Statement ......................................................................................................................................... 20
Comprehensive Income and Expenditure Statement ........................................................................................................ 39
Movement in Reserves Statement .................................................................................................................................... 41
Balance Sheet ................................................................................................................................................................... 43
Cash Flow Statement ........................................................................................................................................................ 45
Notes to the Accounts ....................................................................................................................................................... 46
Note 1 Accounting Policies ................................................................................................................................................ 46
Note 2 Prior Period Amendments ...................................................................................................................................... 48
Note 3 Accounting Standards That Have Been Issued but Have Not Yet Been Adopted ................................................. 52
Note 4 Nature of the Group and Group Members ............................................................................................................. 52
Note 5 Critical Judgements in Applying Accounting Policies ............................................................................................. 56
Note 6 Assumptions Made About the Future and Other Major Sources of Estimation Uncertainty ................................... 57
Note 7 Events after the Reporting Period .......................................................................................................................... 57
Note 8 Expenditure and Funding Analysis ........................................................................................................................ 58
Note 9 Expenditure and Income Analysed by Segment and Nature ................................................................................. 62
Note 10 Adjustments between Accounting Basis and Funding Basis under Regulations ................................................. 64
Note 11 Transfers to/from Revenue Statutory Funds and Earmarked portions of the General Fund ................................ 66
Note 12 Other Operating Expenditure ............................................................................................................................... 67
Note 13 Financing and Investment Income and Expenditure ............................................................................................ 67
Note 15 Property, Plant and Equipment ............................................................................................................................ 68
Note 16 Heritage Assets ................................................................................................................................................... 72
Note 17 Investment Property ............................................................................................................................................. 72
Note 18 Intangible Assets ................................................................................................................................................. 73
Note 19 Financial Instruments ........................................................................................................................................... 74
Note 20 Inventories ........................................................................................................................................................... 77
Note 21 Short Term Debtors ............................................................................................................................................. 77
Note 22 Debtors from Local Taxation ................................................................................................................................ 77
Note 23 Assets Held-for-Sale ............................................................................................................................................ 78
Note 24 Cash and Cash Equivalents ................................................................................................................................ 78
Note 25 Short Term Creditors ........................................................................................................................................... 78
Note 26 Provisions ............................................................................................................................................................ 79
Note 27 Usable Reserves ................................................................................................................................................. 79
Note 28 Unusable Reserves ............................................................................................................................................. 79
Note 29 Capital Grants and Receipts Unapplied Account ................................................................................................. 82
Note 30 Cash Flow Statement - Operating Activities ........................................................................................................ 82
Note 31 Cash Flow Statement - Investing Activities .......................................................................................................... 82
Note 32 Cash Flow Statement - Financing Activities ......................................................................................................... 83
Note 33 Reconciliation of Liabilities Arising from Financing Activities ............................................................................... 83
Note 34 External Audit Costs ............................................................................................................................................ 83
Note 35 Grant Income and Contributions .......................................................................................................................... 84
Note 36 Related Parties .................................................................................................................................................... 85
Note 38 Capitalisation of Borrowing Costs ........................................................................................................................ 86
Note 39 Leases ................................................................................................................................................................. 86
Note 40 Public Private Partnership and Similar Contracts ................................................................................................ 88
Page 11

Page 12

Moray Council Unaudited Annual Account 2022/23 
Note 41 Pension Schemes Accounted for as Defined Contribution Schemes ................................................................... 90
Note 42 Defined Benefit Pension Schemes ...................................................................................................................... 90
Note 43 Contingent Liabilities ............................................................................................................................................ 96
Note 44 Nature and Extent of Risks Arising From Financial Instruments .......................................................................... 96
Housing Revenue Account Income and Expenditure Statement ..................................................................................... 100
Movement on the Housing Revenue Account Statement ................................................................................................ 101
Notes to the Housing Revenue Account ......................................................................................................................... 102
Council Tax Income Account ........................................................................................................................................... 103
Non-Domestic Rate Income Account .............................................................................................................................. 105
Trust Funds ..................................................................................................................................................................... 107
Common Good Funds ..................................................................................................................................................... 115
Glossary of Terms ........................................................................................................................................................... 121 
Page 12

Page 13

1
Moray Council Unaudited Annual Account 2021/22
Management Commentary 
Introduction
Local authority accounting is extremely complex, reflecting the range of services we deliver and the regulations under
which we operate. Trends in spending and income are reported regularly but our day-to-day financial position changes
constantly. The annual accounts are a snapshot of our position at the end of the financial year.  How we present our Annual
Accounts is governed by the Code of Practice on Local Authority Accounting in the United Kingdom. 
The Annual Accounts are presented in four core statements: 
● Comprehensive Income and Expenditure Statement (CIES):  what we spent on delivering services to the public during
the year and how that expenditure was funded; any other changes in our net worth (for example as a result of revaluation
of council assets).
●
● Movement in Reserves Statement (MIRS):  the balance of funding held for various purposes and how that has changed
since last year.
●
● Balance Sheet:  the value of our assets and liabilities.
●
● Cash Flow Statement:  the movement of cash for the year. 
The Annual Accounts also include the accounts of the charitable trusts and Common Goods funds which we administer. 
We have interests in other organisations which, under accounting regulations, have to be incorporated into the group
accounts. These include the charitable trusts, Common Good funds, Grampian Valuation Joint Board, Moray Integration
Joint Board and Moray Leisure Ltd. 
This management commentary is to help those reading the Annual Accounts understand our financial performance in
2022/23. It summarises the key facts from the accounts, illustrates our main achievements in the past year, and highlights
some of the risks and challenges we face in the coming years. 
The management commentary also contains a high level summary of the Council’s capital expenditure during the year.
We need to invest in assets to carry out our day-to-day business and to meet the infrastructure requirements of a changing
population in Moray. The basis for investment in the Council’s assets is the Council’s Capital Strategy. The principles used
to manage our day-to-day finance requirements and longer term borrowing requirement to fund capital investment are
captured in the Treasury Management Strategy and performance against targets reported in the annual Treasury
Management report All these documents are approved by councillors. 
The commentary also looks at the Council’s performance during the year and Key Performance Indicators relating to the
Council’s Corporate Priorities for 2022/23 can be found on our website as well as detailed performance information.
http://www.moray.gov.uk/moray_standard/page_92320.html 
In common with all other organisations, the aftermath of the Covid-19 pandemic has changed some of the ways in which
we deliver our services and relate to our local businesses and communities, and the management commentary gives some
context to this as well as identifying other significant influences on the Council as an organisation. 
Page 13

Page 14

2
Moray Council Unaudited Annual Account 2022/23 
Management Commentary (continued)  
About us
Moray is a largely rural area covering a land
mass of 2,238km2. It has a long coastline on the
Moray Firth with harbours, fishing         villages and
world-class beaches. The area’s population for
2022 is projected to be 95,780. The main
centre of population is Elgin, which is home to
more than one quarter of the people living in
Moray. Other towns of population between
5,000 and 10,000 are Forres, Buckie,
Lossiemouth and Keith. 
Moray Council was established in 1996
following local government reorganisation and
the demise of regional councils.  Elections are
held every five years to appoint the 26
councillors who form the membership of the
Council. Following the May 2022 election, the
Council was led by a minority Conservative
administration. There are three groups of
councillors: Conservative (eleven councillors
reducing to nine following two members
becoming Independents), SNP (nine councillors
following a by-election), Labour (three
councillors).  There is one Scottish Green Party
councillor, and four independent councillors. 
Council members are supported by the
Council’s Corporate Management Team
(CMT) to establish priorities for services and
a programme of continuous improvement.
There are four members of CMT: the Chief
Executive, two Depute Chief           Executives and
the Chief Officer of Moray Integration Joint
Board. They in turn are supported by nine
heads of service (plus 2 NHS equivalent) and a
workforce of 5,066, equivalent to around 3,800
full time staff. Delivering the wide range of
services we’re  responsible for is assisted by a
range of contracts with both the private and
third sector. 
These services include education, social care
and social work (under the direction of Moray
Integration Joint Board), leisure, waste
management, housing, maintenance of the
local roads infrastructure and a range of
regulatory services such as planning. The split
of expenditure between the different
departments of the Council is shown in Note 9
to the accounts. The services we deliver are
largely statutory duties, although we have an
element of discretion as to how we deliver
them, to   best meet local need. 
Page 14

Page 15

3
Moray Council Unaudited Annual Account 2022/23 
Management Commentary (continued) 
Strategy, planning and performance
We agree priorities for public services in Moray with our Community Planning Partners, and these priorities are set out
in our Local Outcome Improvement Plan (LOIP). Our own priorities – specific to council services – are set out in our
Corporate Plan. The latest version of the Corporate Plan identifies priorities under 3 themes – Our People, Our Place,
Our Future – and continues with a focus on ensuring a Sustainable Council for the future, including financial stability. 
Our strategic approach to financial planning is embodied in the Medium to Long Term Financial Plan which accompanies
the Corporate Plan and we aim to achieve financial stability within the next few years. Due to the uncertain economic
climate this Plan has not been updated since February 2021.  It will be updated in September 2023.  General funding
from Scottish Government has been reduced over the past 12 years. We have made savings and we have also made
planned use of reserves to cushion the effect on services of reduced funding. However, this is not sustainable. We have
agreed an Improvement and Modernisation Programme (IMP) as a vehicle to assist in driving out savings by changing
the way in which we operate as a Council.  Regular reports on this are made to Council.  Recent planning has focused
also on our vision for the Council of the future. 
Although our financial planning process in normal times focuses on the medium term, successive single-year settlements
from the Scottish Government have resulted in annual budgets being approved.  The budgets for 2022/23 (General Fund
revenue and capital and HRA revenue and capital) were approved by Council on 22 February 2022. 
We operate two main funds within the council: the General Fund and the Housing Revenue Account (HRA). 
The HRA is self-funding, with all expenditure covered by income raised, primarily from council house rent. We have a
programme of affordable house-building, supported by grant from the Scottish Government. 
The General Fund is mainly funded by grants from the Scottish Government. Council Tax meets less than 20% of general
revenue expenditure. Scottish Government called a halt to the Council Tax freeze in 2017/18 but capped the level of
increase which councils could set in successive years. A freeze was reintroduced for 2021/22 (for the one year only). 
Successive freezes have reduced the proportion of our budget funded by Council Tax. 
In addition to general grant funding we receive specific grant funding for certain services. Increasingly, general grant
funding is linked to Scottish Government priorities such as teacher numbers. The effect of this is to increase the pressure
on those services not identified as a priority by Scottish Government, as they have to bear the brunt of the reduction in
core funding.  COSLA estimate 65% of council expenditure in 2022/23 was directed or restricted by Scottish Government. 
Expenditure is driven by legislative requirements, government priorities and local priorities, as set out in the LOIP and in
the Council’s Corporate Plan. 
We can charge for some of the services we deliver and income generation is seen as an important means of protecting
service delivery. 
We measure our performance using the Council’s Performance Management Framework. Performance is reported to
the appropriate service committee on a six monthly basis. Quarterly reports on our financial performance against the
budget for the Council’s general fund are reported to the Corporate Committee or (depending on the committee cycle) to
the full Council. 
Highlights of successes and challenges for strategic objectives are summarised below (these have been extracted from
final 2022/23 performance reports to committees, which also include service level performance information). 
Education Resources and Communities: 
Successes: developing strategic approaches to capital investment across the learning Estate and sports and leisure
facilities.
Challenges: allocation of budget using Participatory Budgeting (dependent on other services’ involvement).     
Page 15

Page 16

4
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued)
Education Services: 
Successes:  improvement in key attainment measures; including leaver attainment in literacy, numeracy and positive
leaver destinations
Challenges: further improvement of attainment at key stages in the context of ongoing national reforms 
Environmental and Commercial Services: 
Successes: promoting active and green travel and an increase in electric car charging points
Challenges: none reported at Strategic level but at service level some delays in progress were noted including for the
Energy from Waste Project, with running tests ongoing prior to full start up
Economic Development and Growth
Successes: developing a strategic support to funding opportunities, Hydrogen Strategy for Moray approved
Challenges: business new starts below target. 
Housing and Property Services: 
Successes: nothing at strategic level but at service level improvements to homelessness and voids processes were noted
Challenges: identification of land for industrial development 
HR, ICT and Organisational Development: 
Successes: revised Workforce Strategy and Plan approved.
Challenges: recruitment and retention challenges in some services 
Governance, Strategy and Performance: 
Successes: library information hubs implemented across Moray
Challenges: review of Local Outcome Improvement Plan 
Financial Services: 
Success:  successful engagement with local suppliers and local award of meat contract
Challenges:  Long to Medium Term financial strategy still to be reviewed 
Key Performance Indicators (KPIs)
The KPIs below are for 2021/22 as these are the latest approved figures currently available across all services.  As with
the successes and challenges above, these are highlights, and a comprehensive performance report including 2022/23
figures will be published later this year.  The Performance Report for 2020/21 can be found at
http://www.moray.gov.uk/downloads/file148356.pdf
Short term trend
Improving No
Change
Getting
Worse 
Our People
Children & Families Target 2022/23 2021/22 2020/21 Short
term
trend
Percentage of leavers achieving 1+
awards at SCQF level 4 or above
97% March 
2024
97.7% 96.8%
Page 16

Page 17

5
Moray Council Unaudited Annual Account 2022/23
Proportion of pupils entering positive
destinations
95% March 
2024
96.2% 94.1% 
Percentage of Looked After Children
cared for in a community setting
87.5% 82% 81.5% 82.5% 
Management Commentary (continued) 
Percentage of Looked after leavers
achieving 1+ awards at SCQF level
4 or above
77% March 
2024
82% 75% 
Child Protection – Rate of
registration (per 1,000 1-15
population)
2.7 1.4 2.3 1.6 
Adults Target 2022/23 2021/22 2020/21 Short
term
trend
Percentage of adults able to look
after their health very well or quite
well
91% N/A 93% 94% 
Emergency admission rate (per
100,000 population)
11,656 N/A 9,395 8,650 
Percentage of adults supported at
home who agreed they felt safe
80% N/A 72% 79% 
Our Place 
Target 2022/23 2021/22 2020/21 Short
term
trend
Number of Community Asset
Transfers completed
8 3 3 2 
Percentage of Participatory
Budgeting (PB) expenditure
achieved
100% 13.42% 2.8% 2.8% 
Number of new Community Action
Plans in place
3 3 1 0 
Scottish Government have set a target of 1% of a local authority’s budget to be allocated by PB – our target is to achieve
100% of the Scottish Government target; in 2022/23 we have achieved 13.42% of that target.   Many plans to use PB in
2022/23 did not come to fruition, but areas where PB has been used have generally been considered to be successful. 
Our Future 
Target 2022/23 2021/22 2020/21 Short
term
trend
Economic impact of tourism, in
Moray
Increase £147.99m £103.71m £63.01m 
Proportion of 16-29 year old in
Moray population (NRS mid-year)
Increase 15.3% 15.3% 15.1% 
Proportion of people earning less
than living wage (ASHE) Note (1)
Reduce N/A 19.4% 21.5% 
Median gross weekly earnings
(excluding overtime)
Increase N/A £598.80 £565.50 
Page 17

Page 18

6
Moray Council Unaudited Annual Account 2022/23
Median gross weekly earnings – pay
gap Note 2
Improve N/A £170.80 £165.60 
Modern Apprenticeship –
achievement rate
76% 71.2% 69.6% 78.4% 
Note 1 Trend upwards as decreased percentage shows improving result.
Note 2 Trend downwards as increased amount shows a decreased result. 
Management Commentary (continued) 
Our People indicators – Education KPIs and children’s social work KPIs are generally showing an improvement over the
last year but adult care is showing a decrease. 
Our Place indicators – two indicators show an improving trend.  The proportion of budget allocated by PB remains
significantly below target. 
Our Future indicators – a mix of improvement and decreases.
Page 18

Page 19

7
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
Highlights of the year 
May 2022                                          Our People 
Mannachie Park community consultation  
August 2022                                   Our people 
80 Newly Qualified Teachers start with Moray Council 
August 2022                                      Our people 
NearMe appointments launch in Moray Libraries 
February 2023                                Our people 
Sports kits for all launched 
May 2022                                              Our place                       
Lossiemouth East Beach Bridge opens  
June 2022                                         Our  place 
CAT for Garmouth Water Tower 
Page 19

Page 20

8
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
August 2022                                            Our place 
Buckie Community Orchard officially opens 
December 2022                                           Our place 
Buckie’s refurbished synthetic pitch opens 
April 2022                                            Our future 
Storm Arwen response prompts community resilience
action plan updates 
July 2022                                                     Our future 
Fresh food tender for school encourages local
business applications 
September 2022                                       Our future 
Moray Council becomes Living Wage Accredited
Employer  
November 2022                                   Our future 
£880,000 awarded for Just Transition 
Page 20

Page 21

9
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
Financial Results for the year
The Council’s Annual Accounts are prepared on a different basis from the basis on which it sets its budget. The net
income for 2022/23 in the Comprehensive Income and Expenditure Statement (CIES) is £272.988 million (2021/2020:
£121.836 million). This adds together the General Fund and HRA, to give an overall picture of the Council’s financial
activities in the year. It also includes a number of accounting entries required by the accounting regulations but which
are not a charge on the income the Council receives to deliver services and which cannot create income which the
Council can use. The impacts of these accounting entries are reflected in the Council’s unusable reserves. The
Council’s usable reserves show what the Council has available to spend, either on a planned basis or to meet
unexpected contingencies. 
Usable reserves       Unusable reserves 
£724.007 million 
The Movement in Reserves Statement shows the net income to the Council per the CIES analysed across the General
Fund, HRA, other usable reserves and unusable reserves. The net income of £272.988 million shown in the CIES is the
increase in overall reserves: an increase of £272.183 million in unusable reserves and £0.805 million usable reserves.
Note 11 to the accounts further analyses the movement in the General Fund, showing a breakdown of the various ear-
marked reserves (reserves set aside for specific purposes) and a balance of £5 million in free general reserves (2021/22
£5 million).  The free general reserves are a cushion against unexpected events and the Council looks at various financial
risks in setting the balance it requires to keep. 
General fund revenue expenditure
We set the budget for 2022/23 on 22 February 2022.  During the year the budget was revised, mainly to reflect additional
funding from Scottish Government. The original and revised budgets and actual out-turn are set out below, with
explanations of main variances on page 13: 
2022/23
We planned   
We revised
to 
2022/23 
We out- turned 
2021/22
results
Expenditure £m   £m  £m  £m
Departmental 204.444  238.453  228.977  204.526
Loans Fund 13.707  19.000  12.244  19.702
Additional provisions - monies held centrally 22.581  0.774     
240.733  258.227  241.221  224.228
Funded from:       
SG Grant 180.723  192.704  193.427  183.381
BRIS  -     0.023
Council Tax 46.555  46.555  47.687  45.979
Use of reserves 10.335  17.792    
Financial flexibilities 3.120 0  -   (5.155) 
240.733  258.227  241.114  224.228 
The Council Tax Income Account in the Accounts for 2022/23 show Council Tax income of £48.375 million. £0.688 million
was transferred to the HRA in respect of second homes and long-term empty dwellings (2021/22: £0.662 million). We
collect Non Domestic Rates (NDR) on behalf of Scottish Government. NDR revenue is pooled at a national level then
redistributed to councils as part of the government’s grant funding for local authorities.  Moray has    5,654 rateable
properties (2021/22 5,569) with a combined rateable value of £124 million, a reduction of £2 million from 2021/22.
General Fund £45.698 million
HRA £2.418 million
Other £11.732 million
£1,029.5732
million
Page 21

Page 22

10
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
Commentary on year-end position
Main reasons for variance from budget. 
Amount 
Loans pool holiday £7.583m
Underspend in services (see page 10) 
Staff vacancies 2,049
Additional income in services 2.298
DSM / PEF 1,700
Other underspends in services 1,394
Council Tax additional income 1.132
Central provisions unspent / additional savings 0.774
Interest on Revenue Balances 0.715
Other 1.216
Underspend for year against budget 18.861 
Ear marked reserves Amount
Note 11 shows the detail of this Movement in Reserves:  
Free general reserves – no movement, sits at policy minimum 
Devolved School Management -reduction (£0.436m)
Pupil Equity Funding – reduction £0.289m
Transformation – no movement 
Council priorities – no movement 
Covid-19 – increase £0.638m
Other ear-marked reserves - increase £0.376 m
Total movement in general reserves - increase £0.289m 
Although reserves have increased, there has been slippage in some planned expenditure and late receipt of Scottish
Government grant related to specific initiatives and so some of the reserves are already committed to fund expenditure in
2022/23 and beyond.  £2.2m movement into covid reserves arises from fund slippage in departments / late receipts – more
than the net transfer in. 
Page 22

Page 23

11
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
Service expenditure
The adjustments to service expenditure from the accounting basis to the funding basis is shown in Note 8 to the accounts.
The table below compares budgeted expenditure to actual expenditure on the funding basis and highlights the main reason
for the variance in each service. 
Service Budget
£000s
Actual
£000s
Reason for variance 
Education  78,538  77,123  Mainly Devolved School (DSM) budgets and Pupil Equity Funds
(PEF), all of which      are carried forward in separate ear-marked
reserves.  DSM and PEF are spent across the academic year and
carry forward is expected.   
Education
Resources  and
Communities 
25,494  23,718  Mainly staff vacancies.  Income from sports facilities above budget. 
Children’s Social
Work Services 
18,225  16,382  Reduced cost of care due to number and type of placements and delay in
awarding contracts.  Income from refugees will be carried forward. 
General Services
Housing and
Property  Service 
4,890  4,704  Delay in implementing Rapid Rehousing Transition Plan – this will be
carried forward to 2023/24.  Additional income from Industrial Estates. 
Environmental and
Commercial
Services 
28,102  27,885  Income above budget in a number of areas. Overspend on winter
maintenance due to worse weather than budgeted for. 
Economic Growth
and  Development 
5,415  4,314  Staff vacancies and delays in projects.  Building Control and Planning
fees above budget. 
HR, ICT & OD  5,935  5,829  Staff vacancies and a number of minor underspends. 
Financial Services  2,079  1,279  Interest on Revenue Balances (higher interest rates). 
Governance,
Strategy  and
Performance 
6,999  6,402  Mainly staff vacancies. 
Social Care services  58,723  58,659  Moray Integration Joint Board expenditure was met in full from Board
funds. 
Other expenditure  2,553  2,503
No major variance 
Total
departmental
spend 
236,953  228,798 
Page 23

Page 24

12
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
The out-turn figures are those reported to Council on 28 June 2023 – these are expressed on the same basis as the
budget figures. The out-turn included in the CIES is calculated in accordance with accounting requirements. The main
difference between the 2 bases are set out in Note 8 to the accounts and can be summarised as below: 
Description Amount
Departmental Outturn per Management Commentary 228,798
Statutory Adjustments 41,438
Bad Debt Provision – reflected in service outturn but in Financing and
Investment  Income in the CIES
630 
270,866
Net Cost of Services in CIES 270,866   
Savings 
When the Council set its budget for 2022/23 it included savings of £1.576m – £0.068 million were one off savings with
recurring savings  of £1.508 million, £0.204 million from increased income, £0.293 million from efficiencies, £0.8 million
from Children’s Service review of practice and £0.211 million other savings.  The bulk of the savings were achieved.  The
indicative savings from the Improvement and Modernisation Programme (£0.293 million) were not realised, though
progress is being made with the work streams.  However, additional savings identified after the budget was approved more
than covered the shortfall and in all a total of £3.318 million savings were removed for the budget, with £2.032 million of
these recurring. 
Financial flexibilities 
When the Council set its budget for 2022/23 it assumed that it would use one of the financial flexibilities indicated as
available by Scottish Government to facilitate additional expenditure arising from the covid-19 pandemic, amounting to
£3.12 million.  The flexibility was to fund covid-related expenditure from capital receipts.  However, this required permission
from UK Government and that permission was not granted.  During the year the decision to use the financial flexibility of a
loans pool holiday was agreed and that has resulted in a one-off saving of £7.5 million.  Financial flexibilities regarding
service concessions have been approved for 2023/24. 
Page 24

Page 25

13
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
Housing Revenue Account 
Our 6,332 houses (2021/22: 6,287) are held on the Housing Revenue Account (HRA). 
The balance on the HRA is shown in the Movement in Reserves Statement – at the end of 2021/22 the balance had
decreased by £0.047 million from the balance at the end of 2021/22 bringing the total balance to £2.418 million. The HRA
budgeted to break even in 2022/23, with planned expenditure of £21.666 million met from rent and other income. 
As budgeted Budget
£000s
Actual
£000s
Reason for variance 
Rental income  (21,557)  (21,499) 
Other income  (89)  (258) 
Supervision and     management  4,533  4,831 
Repairs and maintenance  7,956  8,502 
Financing cost 4,096 4,553 Increased interest rates 
Capital Funded from Revenue  4,303  3,404 
Other expenditure  788  514 
Use of/ (return to  reserves)   47  £47,000 net overspend 
Reconciliation to accounts £000s 
Use of/ (return to reserves)  47) 
Statutory Adjustments (per Note 8)  1,744 
Adjustments to Usable Reserves Permitted by Accounting Standards  2,844 
CFCR (net of Council tax Discount on 2nd Homes)  (3,404) 
IORB – included in outturn but not in the Net Cost of Services  156 
Financing Costs – included in outturn but not in the Net Cost of Services  (4,553) 
Net Cost of Services per CIES  (3,166) 
Page 25

Page 26

14
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
We invest in building new homes and improve the existing ones, supported where possible by government grant. 
New build
2022/23 – planned £14.099 million, actual £9.169 million – 65% of planned
2021/22 – planned £16.305 million actual £4.976 million – 31% of planned 
Planned expenditure for 2022/23 included new build at Speyview in Aberlour.  This project was delayed due to protracted
negotiations over development costs in the context of current volatility in the construction industry, along with
infrastructure difficulties on site, with the outcome that this project will be delayed until the next update of the HRA
Business Plan, planned for 2024/25.  The project at Bilbohall, Elgin was deemed to be not financially viable in the form
originally tendered, following detailed cost review.  Alternative options are being considered.  In light of procurement
difficulties experienced at Bilbohall and issues in the construction industry the Council has withdrawn its interest in the
proposed development at the former Spynie Hospital in Elgin. 
Housing improvements
2022/23 – planned £10.610 million, actual £8.487 million – 80% of planned
2021/22 – planned £10.620 million, actual £6.793 million – 64% of planned 
The underspend on the Housing Investment Capital Programme occurred as a result of a lack of availability of external
contractors and internal staff resourcing issues that led to delays in the development of some key investment
programmes. 
Page 26

Page 27

15
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
General Services Capital Programme
We originally planned to spend £54.1 million on capital projects in 2022/23, which was amended to £43.4 million during
the year, reflecting changed timescales for projects. Following delays in a major construction project (£5.3m slippage),
delays in delivery of vehicles because of supply chain difficulties (£0.8 m slippage), underspends on various bridge projects
(£2.7 million), and other delays we actually spent £28.3 million (2021/22: £31.0 million).   
£28.3m 
Invested in Moray during the year – main items summarised
below 
● £4.5m
New schools, improvements to
existing schools and facilities for
early learning and childcare 
● £2.0m
Moray Growth Deal 
● £5.1m
Waste management facilities,
including  a joint project with
Aberdeen City and
Aberdeenshire councils to build
an energy from waste plant
(£6.3m) and completion of works
at Moycroft depot 
● £3.0m
Bridge renovations 
● £2.6m
Vehicles and electric car chargers 
● £2.5m
Other land and buildings 
● £6.4m
Road improvements, road
safety measures and
sustainable travel 
● £0.7m
Street lighting 
● £1.5m
ICT and other equipment 
Page 27

Page 28

16
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
Balance sheet
The balance sheet records our assets (such as properties, vehicles, investments and cash) and liabilities and is a
snapshot of our value or financial position at 31 March 2023.
Our Assets 
Less our liabilities 
Give our net value 
Our net value has increased by £273 million during 2022/23. 
Significant movements are:
● £90m increase in the value of property, plant and equipment, through additions and revaluations. 
● £161m pension asset following the triennial actuarial assessment (was £55m liability in 2021/22 
-
200
400
600
800
1,000
1,200
1,400
1,600
2022/23 2021/22
Assets
Long Term Assets Current Assets
-
50
100
150
200
250
300
350
400
450
2022/23 2021/22
Liabilities
Current Liabilities Long Term Liabilities
- 200 400 600 800 1,000 1,200
2022/23
2021/22
Net value
Page 28

Page 29

17
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
Future risks
The Council maintains and keeps under review a corporate Risk Register, with risks grouped under nine themes,
including financial risk. This section of the management commentary identifies the Council’s main concerns for financial
risk and also areas of planned development.
We expect to need to make savings over the next two years with the ultimate goal of balancing our budget without
relying on reserves. However, there is considerable lack of clarity about our future financial position. 
Our main risks are: 
• Risks arising from increased inflation and interest rates, with likely impact on pay claims and general increases in
prices across the board;
• Future funding, with Scottish Government finances under pressure and being targeted to specific priorities;
• Significant funding at UK and Scottish Government level coming from bid funds, requiring expertise and effort to
access and with considerable monitoring requirements;
• Demographic pressures and emerging social needs post pandemic;
• Significant difficulties in recruiting staff ;
• Moray Integration Joint Board (MIJB) is overcommitted against its budget and we will have to fund our share of any
overspend. The long-term impact of the pandemic on MIJB services is as yet unknown;
• Our school estate requires significant investment to bring facilities up to the Scottish Government’s recommended
‘B-B’ standard;
• Meeting our target of carbon neutral by 2030 will be a financial and technical challenge. 
How we are managing these risks 
• Financial planning, monitoring and review, including planning in the short to medium and medium to long term;
• Working within Moray Economic Partnership to support the local economy;
• Developing Community Wealth Building;
• Creating teams with expertise in bidding for funds;
• Workforce planning;
• Reviewing our capital programme for areas of increased risk of slippage and / or costs increase and developing
a mechanism to further prioritise our capital spend;
• Joint monitoring reviews with MIJB officers and officers and Board members from NHS Grampian;
• We are carrying out a comprehensive Learning Estate Review;
• We have mapped out a high-level route map to net zero. 
…….and opportunities 
• The Moray Growth Deal, which will see significant investment in Moray’s economy;
• Learning lessons from the pandemic about new ways of working and opportunities which arise from this, importing
this learning into our revised core strategies and policies;
• Our Improvement and Modernisation Programme, redesigning how we deliver services in today’s world to deliver
efficiencies, building on our investment in ICT for flexible working and investing in Council priorities;
• Our Learning Estate Review, looking at how we can improve the learning experience by enhancing the environment
in which it takes place;
• Our Climate Change Strategy, looking to become carbon neutral by 2030.
Page 29

Page 30

18
Moray Council Unaudited Annual Account 2022/23
Management Commentary (continued) 
Next steps
The Council is preparing its budget for 2024/25, has an indicative budgets for 2025/26 and will forecast the position for
2026/27. Although our level of funding from Scottish Government will not be confirmed for some months, we expect
the need to make savings to continue.  The awaited New Deal between Scottish Government and local authorities may
assist this task. 
We have agreed to adopt a hierarchical approach: 
Our focus is on Improvement and Modernisation of services through further development of our change programme
focussed on financial savings, with provision made for investment to transform how the Council delivers services with
an eye to the future,   while also generating efficiencies. This requires radical rethinking of the expectations around which
services the council can continue to deliver within the resources available to it and this will take time to progress through
to implementation.  The challenge is how to achieve this step change with a parallel and pressing need for savings in
early course.  The Council’s key strategic documents including the Corporate Plan and LOIP are being refreshed. 
Financial Plans are under review in both the short to medium and medium to long term, with known risks and opportunities
are highlighted above.  T h e s e s t r a t e g i e s w i l l b e r e v i e w e d i n t h e l i g h t o f t h e N e w
D e a l w h e n d e t a i l s o f t h i s a r e a n n o u n c e d .  In addition to this there are other factors such as the
impact of the war in Ukraine and Scottish Government proposals for a National Care Service. We work in a constantly
changing environment and strive to be an agile organisation, well equipped to cope with the many changes we
encounter. 
Councillor Kathleen Robertson                   
Leader of Moray Council 
Roderick D. Burns 
Chief Executive 
Lorraine Paisey 
Chief Financial Office
Transform /spend to save
Increased income
Reduce / cease
service
Page 30

Page 31

19
Moray Council Unaudited Annual Account 2022/23
Statement of Responsibilities for the Annual Accounts 
The Council’s Responsibilities 
The Council is required to: 
• make arrangements for the proper administration of its financial affairs and to secure that the proper officer of the
Council has the responsibility for the administration of those affairs (section 95 of the Local Government
(Scotland) Act 1973).  In this authority, that officer is the Chief Financial Officer.
• manage its affairs to secure economic, efficient and effective use of resources and safeguard its assets.
• ensure the Annual Accounts are prepared in accordance with legislation (The Local Authority Accounts (Scotland)
Regulations 2014) and the Local Authority (Capital Finance and Accounting) (Scotland) (Coronavirus)
Amendment Regulations 2021), and so far as is compatible with that legislation, in accordance with proper
accounting practices (section 12 of the Local Government in Scotland Act 2003).
• approve the Annual Accounts for signature. 
I confirm that these Annual Accounts were approved for signature by the Council at its meeting on 
Signed on behalf of Moray Council.   
Councillor Kathleen Robertson        
Leader of Moray Council                                               
The Chief Financial Officer’s Responsibilities 
The Chief Financial Officer is responsible for the preparation of the Council’s Annual Accounts in accordance with proper
practices as required by legislation and as set out in the CIPFA/LASAAC Code of Practice on Local Authority Accounting
in the United Kingdom 2021/22 (the Accounting Code). 
In preparing the Annual Accounts, the Chief Financial Officer has: 
• selected suitable accounting policies and then applied them consistently.
• made judgements and estimates that were reasonable and prudent.
• complied with legislation.
• complied with the Local Authority Accounting Code (in so far as it is compatible with legislation). 
The Chief Financial Officer has also: 
• kept adequate accounting records, which were up to date.
• taken reasonable steps for the prevention and detection of fraud and other irregularities. 
I certify that the financial statements give a true and fair view of the financial position of the Council and its Group at the
reporting date and the transactions of the Council and its Group for the year ended 31 March 2023. 
Lorraine Paisey CA        
Chief Financial Officer 
Page 31

Page 32

20
Moray Council Unaudited Annual Account 2022/23
Annual Governance Statement 
Scope of Responsibility 
The council is responsible for ensuring that its business is conducted in accordance with the law and proper standards,
and that public money is safeguarded, properly accounted for, and used economically, efficiently and effectively. The
council has a statutory duty to make arrangements to secure Best Value under the Local Government in Scotland Act
2003. 
In discharging these responsibilities, Elected Members and the Corporate and Senior Management Teams are responsible
for putting in place proper arrangements for the governance of the council’s affairs and for facilitating the effective exercise
of its functions. In delivering these functions, there is a requirement to have effective partnership working with others,
principally with NHS Grampian and Moray Integration Joint Board, Grampian Valuation Joint Board and the Moray Leisure
Centre, as well as with other bodies involved in Community Planning. 
This annual governance statement explains how the council has used the CIPFA/SOLACE 2016 Framework ‘Delivering
Good Governance in Local Government’ as a basis for considering the effectiveness of its own governance arrangements.
The framework predates the Covid 19 pandemic, yet remains relevant as a good practice guide on how councils should
be ‘managed and controlled’. 
Framework for Good Governance 
The overall aim of the ‘Delivering Good Governance in Local Government’ Framework is to ensure that: resources are
directed in accordance with agreed policy and according to priorities; there is sound and inclusive decision making; and
there is clear accountability for the use of those resources in order to achieve desired outcomes for service users and
communities. 
The CIPFA/SOLACE Framework defines the seven core principles of good governance, namely: 
1. Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the rule of law; 
2. Ensuring openness and comprehensive stakeholder engagement; 
3. Defining outcomes in terms of sustainable, economic, social and environmental benefits;
4. Determining the interventions necessary to optimise the achievement of the intended outcomes; 
5. Developing the entity’s capacity, including the capability of its leadership and the individuals within it;
6. Managing risks and performance through robust internal control and strong public financial management; and 
7. Implementing good practices in transparency, reporting, and audit to deliver effective accountability. 
The key elements of the council’s governance arrangements are described in terms of the seven principles defined in the
Framework, summarised as follows: 
1. Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the rule of law 
The roles and responsibilities of elected members and officers and the processes to govern the conduct of the council’s
business are defined in procedural standing orders, a scheme of administration, a scheme of delegation, and financial
regulations. These are updated regularly as required, with a review of committee structures completed during the year.
Codes of Conduct for both elected members and officers have been developed and these define the ethical values and
standards of behaviour expected. The Codes draw on the ‘Standards in Public Life’ covering issues including leadership,
fairness and integrity. 
A Monitoring Officer is responsible for ensuring that agreed procedures are followed and that all applicable statutes and
regulations are complied with. Elected members have been provided with induction training post the Local Government
elections in May 2022 and definitions of leadership roles and behaviours developed and agreed. 
2. Ensuring openness and comprehensive stakeholder engagement 
As the recovery from the pandemic continues and the council looks for improvement and modernisation opportunities,
meetings of the council and its committees are now delivered using a hybrid format that enables attendance in person or
via web link. Meetings are live streamed and thus available for public viewing, with matters discussed and determined in
confidence relating only to those deemed confidential in terms of Part 1 of Schedule 7A of the Local Government (Scotland)
Act 1973.  The rationale for all decisions proposed and taken is fully set out in committee reports. 
Stakeholder engagement is central to the council’s work at a strategic level, e.g. with community planning partners and on
policy development or planned changes to services affecting communities or individual service users. Such engagement
includes activity targeting citizens who are less likely to participate so as to better inform decision making processes.
During the year, the Community Planning Partnership worked with community and third sector partners to refresh the
Community Engagement Strategy. This was officially re-launched at an event in UHI Moray, and the updated strategy will
support the development of future community and corporate plans as well as guiding consultation with local communities,
for example, in progressing the participatory budgeting initiative. 
The council seeks and obtains feedback on delivery of its services having adopted a comprehensive complaints procedure
based on a model scheme developed by the Office of the Scottish Public Services Ombudsman. All complaints are
responded to as appropriate, and inform improvements to service delivery. A comprehensive report on complaints handling
is prepared and presented annually to a council committee. 
Page 32

Page 33

21
Moray Council Unaudited Annual Account 2022/23
Annual Governance Statement (continued) 
3. Defining outcomes in terms of sustainable economic, social, and environmental benefits 
The creation and implementation of a vision for the local area, including expected outcomes for the community, is
encompassed in the Local Outcomes Improvement Plan (LOIP). The overarching aim and purpose of this 10-year Plan is
‘to raise aspirations by creating an enabling environment where our residents can achieve expanded choices, improved
livelihoods and wellbeing”. 
In particular, the LOIP recognises the importance of and benefits from reducing inequalities and poverty, with outcomes
focused on the need for a growing, diverse and sustainable economy, building a better future for our children and young
people in Moray, empowering and connecting communities, and a broadened objective of improving the wellbeing of our
population. 
The LOIP is a partnership plan and its strategic delivery is overseen by a Community Planning Board, which meets
quarterly. The Board monitors plan performance for each quarter and during the year considered a number of key strategic
documents, notably the NHS Grampian ‘Plan for the Future’  2022-2028, that seeks to address pressures within the Health
Service; and a refreshed Moray Economic Strategy 2022-2032 that has regard to change occasioned by the pandemic,
the UK departure from the European Union, cost of living and doing business pressures, Climate Change and Net Zero
targets, and the progress to date of the Moray Growth Deal. 
Aligned to the LOIP, the council has its own Corporate Plan 2019-2024 that details specific council priorities under the
banner of ‘Our People, Our Place, Our Future.’ The plan sets targets for improvement consistent with maintaining a
sustainable council that provides valued services to its communities, and these targets are monitored through a
Performance Management Framework. A review of the plan, involving wide consultation and incorporating the priorities of
the council formed post the local government elections in 2022, has been progressed during the period. This work will
inform a new Corporate Plan that will run from 2024. 
4. Determining the interventions necessary to optimise the achievement of the intended outcomes  
The strategic Community and Corporate Plans are translated into service plans prepared within each service area. These
facilitate delivery of agreed outcomes and assist in securing continuous improvement. Service plans are reported to a
meeting of the council or appropriate service committee for consideration and approval, in reports that provide detailed
information on planned activity. The reports contain a ‘Summary of Implications’ section that links report content to strategic
plans, legal and policy issues; risk, staffing and property matters; equalities; social impact; and climate change and
biodiversity considerations. A particular focus is given to financial implications given the current economic climate. 
The council is fully aware of the financial challenges it faces and through its established committee structures, elected
members have been provided with an extensive volume of information on both the availability of resources and options for
future service delivery. This has been reflected in reports to the council on budget setting, including projections for the next
two years; a capital strategy; and regular budget monitoring reports. The council successfully delivered a balanced budget
for 2023/24. 
Other interventions contributing to good governance during the period included reports providing high-level assessments
of council priorities, service pressures and risks, and how these are inter-connected, as well as the provision of updates
on numerous policy initiatives including Workforce Planning, Climate Change, Educational Attainment, and Best Value.
Progress towards achieving agreed outcomes is monitored through an established Performance Management Framework
that calls for quarterly reporting on key performance measures developed for each service. In addition, the council
participates in the Local Government Benchmarking Framework which compares a range of established performance
measures with those of other Scottish local authorities. Elected Members are provided with reports to review, scrutinise
and note actions undertaken by Services to improve performance. 
5. Developing the entity’s capacity, including the capability of its leadership and the individuals within it 
The Corporate Management Team (CMT) consists of the Chief Executive, two Depute Chief Executives and the Chief
Officer, Health & Social Care (Moray Integration Joint Board), supported by a Senior Management Team (SMT) comprising
nine Heads of Service. CMT/SMT meet frequently to discuss and provide leadership on the strategic direction of the
council.   The roles of officers are defined in agreed job profiles. 
The Chief Executive is responsible and accountable to the council for all aspects of management including promoting
sound governance, providing quality information/support to inform decision making and scrutiny, supporting other statutory
officers and building relationships with all elected members. 
Leadership capacity of senior officers is supported through the promotion of a Leadership Forum, which brings together
senior managers from all services to provide a wider perspective on the consideration of issues facing the council. Forum
meetings ensure consistent messaging is available from senior management to managers. Human Resources have
continued to review and refine the leadership development strategy and provide training opportunities online. 
Page 33

Page 34

22
Moray Council Unaudited Annual Account 2022/23
Annual Governance Statement (continued) 
The council has an agreed elected members’ development strategy that, in addition to the Induction Programme, includes
an on-going training programme of learning, development and briefings. Members appointed to certain committees also
receive specific training related to the responsibilities of these committees. 
In addition, elected members represent the council on a range of outside bodies, including on boards of other Community
Planning partners, across partnership bodies such as the Moray Economic Partnership, various national bodies such as
COSLA and its themed Boards, and a broad range of charitable and third sector organisations. This representation
provides valuable learning and networking opportunities for those members. 
6. Managing risks and performance through robust internal control and strong public financial management  
The council has a risk management policy and strategy designed to support the identification, evaluation and mitigation of
risks that may impact on its ability to meet its objectives. A Corporate Risk Register provides summary information on what
the CMT/SMT considers are the principal risks facing the council and how these are managed and controlled. Risk
implications also feature in committee reports to inform the decision-making process. 
The council’s system of internal control is based on a framework of financial regulations, regular management information,
administrative procedures, management supervision and a scheme of delegation that defines accountabilities of senior
officers. Establishing and maintaining an effective system of internal control is a management function. An Audit and
Scrutiny Committee, through its consideration of reports by internal and external auditors, monitors the effectiveness of
the system of internal control. 
Strong financial management is secured through the work of the Chief Financial Officer appointed in terms of s. 95 of the
Local Government (Scotland) Act 1973. This officer advises the Council on all financial matters and ensures the timely
production and reporting of budget estimates, budget monitoring reports and annual accounts. Draft and audited Annual
Accounts are published on the council website. 
7. Implementing good practices in transparency, reporting, and audit to deliver effective accountability 
Council business is conducted through an established cycle of webcast committee meetings. Webcasts remain available
for viewing for 12 months following a meeting. Meeting dates are published in advance, and agenda papers are made
available at least one week before meetings take place. Minutes of meetings are prepared and important decisions are
publicised on the council website and through social media. 
The council’s website provides a platform from which to disseminate a wide range of information including news items on
policy decisions, guidance on council services and on service disruptions/interruptions arising from weather events or
similar. The website facilitates efficient access to digital services across a range of service areas and allows for
consultations to be undertaken and for interested parties to provide feedback electronically. 
The council responds to the findings and recommendations of Internal Audit, External Audit, Scrutiny and Inspection bodies
generally by developing improvement Action Plans. The Audit and Scrutiny Committee is integral to overseeing
independent and objective assurance processes that make recommendations for improvements to the system of internal
control. The Committee’s Terms of Reference were reviewed and updated during the year. 
The council responds to requests for information and Freedom of Information legislation having processed over 1,300 such
requests during the period covered by this statement. 
Review of Adequacy and Effectiveness of the Council’s Governance Framework 
In order to assess the effectiveness of the governance framework, including the system of internal control, it is necessary
to consider the role of the functions and individuals who contribute to it, as follows: 
•  Elected Members 
Governance arrangements at a political level emanate from the council, its committees and from other roles that elected
members fulfil. These include participation in the Community Planning Board and associated groups for multi-agency
issues. Elected members also have substantive roles on the Moray Integration Joint Board for Health and Social Care, the
Grampian Valuation Joint Board, and the Moray Leisure Arm’s Length External Organisation (ALEO), each of which has
its own governance arrangements. In addition, elected members have membership and represent Moray Council interests
in partnerships that contribute to meeting council aims and objectives, notably in the development and delivery of the
Moray Growth Deal.   
Page 34

Page 35

23
Moray Council Unaudited Annual Account 2022/23
Annual Governance Statement (continued) 
• Audit and Scrutiny Committee
The council has an Audit and Scrutiny Committee where elected members consider reports on audit work completed.
These provide assurances on the adequacy and effectiveness of the system of internal controls including those relative to
the delivery of plans, compliance with laws and regulations, accuracy of information and safeguarding of assets. The
Committee also receives reports on the performance of and trends from council services regarding service standards and
performance information. During the period covered by this statement, to further strengthen oversight processes, two
external members have been appointed to the committee in line with Chartered Institute of Public Finance and Accountancy
best practice guidance for Audit Committees operating in Local Government. 
This committee is a key component of good governance, distinguished from other committees by the role elected members
are required to fulfil, not in setting policy or considering service matters, but by providing independent oversight and
challenge in support of the council’s duty to secure continuous improvement. These functions are delivered independently
from the supervisory oversight roles of the Corporate and Senior Management Teams. 
• The Corporate Management Team 
The Corporate Management Team (CMT) has overarching operational responsibility for good governance arrangements.
The team comprises the Chief Executive, two Depute Chief Executives with portfolio responsibilities for Education,
Communities and Organisational Development; and Economy, Environment and Finance respectively, and the Chief
Officer (Health and Social Care Integration). 
• The Corporate Management Team / Senior Management Team 
This is an extended management team comprising the CMT and Heads of Services. The role and remit of this group is to
support the formulation and implementation of policies, strategies and plans to achieve local and national outcomes, share
and promote good practice from an inter-service perspective, to act with the wider objectives of the council in mind to
ensure the resources are effectively deployed, and assist CMT in keeping the governance of the council and its services
under review. 
Individual Heads of Service, collectively the Senior Management Team (SMT), have considered the effectiveness of
governance arrangements within their respective services by reference to the principal risks identified in the Council’s
corporate risk register and provided assurance statements for use in the preparation of this corporate statement. This
affirms the broad ownership of good governance and recognition of its importance within the senior leadership of the
council. 
Generally the assurance statements are positive with limited commentary on governance weaknesses, albeit it has been
noted in several statements that minor data breaches have occurred. While in part this may be a reflection of a move to
hybrid working post pandemic and an increase in electronic communications, the importance of holding personal data
securely has been recognised and priority given to refresher training on this topic. This should minimise the risk of further
similar breaches occurring. 
• The Head of Governance, Strategy and Performance (Monitoring Officer) / Chief Financial Officer 
The Head of Governance, Strategy and Performance and the Chief Financial Officer perform their respective statutory
duties as outlined elsewhere in this statement. In discharging the responsibilities of the role, the Chief Financial Officer
complies with the governance requirements of the CIPFA Statement on the role of the Chief Financial Officer, and the
Head of Governance, Strategy and Performance provides an information annual report on the duties of Monitoring Officer
to a meeting of the council. 
• The Chief Social Work Officer 
The Head of Service for Health and Social Care Moray undertakes the statutory role of Chief Social Work Officer (CSWO).
The latest available CSWO annual report for the 2021/22 year noted that governance and accountability arrangements
remained unchanged throughout the year, with accountability of the CSWO being to the Moray Integrated Joint Board
(MIJB) for adult services, and to Education, Communities and Organisational Development Committee and Moray Council
on matters relating to children and young people and justice social work. 
The report noted that planning for the delegation of children’s social work to the Integrated Joint Board was continuing,
and it has since been confirmed that this will proceed during 2023/24. Overall the report concluded that notwithstanding
the governance arrangements in place, Social Work, like other areas of Health and Social Care, continued to experience
pressures. 
Page 35

Page 36

24
Moray Council Unaudited Annual Account 2022/23
Annual Governance Statement (continued) 
• Internal Audit 
The council has a system of internal control designed to manage risk to a reasonable level. Internal controls cannot
eliminate the risk of failure to achieve policies, aims and objectives and can therefore only provide reasonable and not
absolute assurance of effectiveness. 
The Audit and Risk Manager complies with mandatory Public Sector Internal Audit Standards and with published good
practice guidance e.g. on the Role of the Head of Internal Audit in Local Government. During the year, the Internal Audit
Charter and the council’s Policy to Combat Fraud, Theft, Bribery and Corruption were updated. The Audit and Risk
Manager is accountable on a day-to-day basis to the Head of Governance, Strategy and Performance and to the Audit
and Scrutiny Committee. 
The internal audit plan for the year includes a range of audit projects covering main financial systems, other systems
operating within services and several ad-hoc/unplanned projects. The outcomes from these projects, together with any
recommendations to enhance the control environment, are reported to the Audit and Scrutiny Committee. This Committee
is chaired by an elected member who is not part of the council Administration. Almost all planned reviews detailed within
the Annual Internal Audit Plan for 2022/23 have been completed. 
The Public Sector Internal Audit Standards require an internal audit opinion to be provided annually. As planned audit work
was substantially completed by the year-end, and based on his wider knowledge of the organisation and its control
systems, it is the opinion of the Audit and Risk Manager that reasonable assurance can be placed upon the adequacy and
effectiveness of the governance and control environment which operated in the council during the year. 
• Health & Social Care Integration 
The council, as a key partner within Health and Social Care Moray has an interest in the governance arrangements within
the Moray Integration Joint Board (MIJB). Internal Audit arrangements for the MIJB are provided jointly by the council’s
Internal Audit service and NHS Grampian’s Internal Auditors. The council’s Internal Audit Service provides assurance over
social care services, and oversight of the MIJB governance arrangements. A separate internal audit opinion is provided in
respect of audit projects completed for the MIJB. 
• External Agencies 
In addition to the various internal review processes and the external audit of the Annual Accounts, aspects of the council’s
governance arrangements are considered in various inspection reports produced by the external auditor and other
inspectorate agencies. 
Audit Scotland’s Best Value Assurance Report on Moray Council contained eight recommendations. An action plan was
developed in response and good progress has been made. The council remains committed to responding positively to the
remaining recommendations to strengthen governance arrangements, with progress closely monitored and updated status
reports on each action being reported to the appropriate committee. 
Overall assessment of the effectiveness of governance arrangements 
Having regard to the information provided in the preceding paragraphs, it is considered that established systems and
processes are broadly effective and not inconsistent with the seven principles identified in the ‘CIPFA/SOLACE’ Framework
‘Delivering Good Governance in Local Government.’ 
Significant governance issues 
Governance issues highlighted as significant in the Annual Governance Statement for 2021/22 went beyond describing
governance processes and how effective they operated in practice, also providing commentary on the planned strategic
direction of the council and its partners, and linked risk issues. That strategic direction continues to be developed and
adapted in response to multiple factors both external and internal, and is covered more appropriately in a separate
Management Commentary, also published with the Annual Accounts.   
Page 36

Page 37

25
Moray Council Unaudited Annual Account 2022/23
Annual Governance Statement (continued) 
Specific governance issues noted in the prior year and how they have been addressed relate to: 
An externally commissioned review on the management of social care contracts 
A report on this was published in February 2023, and has been submitted to the Audit, Performance and Risk Committee
of the Moray integration Joint Board and to the council’s Audit and Scrutiny Committee for their respective interests. The
report covers a complex area of work, with Self-directed Support legislation enabling individuals to exercise choice and
control over the support or services required to meet assessed care needs. While the legislation provides welcome
flexibility in terms of personalising care provision, this has created challenges for the Commissioning Service to review and
update contractual agreements with multiple suppliers of care services, at a time when these services are operating under
difficult market conditions with staffing and cost pressures widely documented. 
The report makes recommendations to strengthen governance arrangements and deliver improvements. These
recommendations have been accepted by the management of Health and Social Care Moray, and will require the
Commissioning Service to work more closely with the council’s procurement team going forward, and to develop an action
plan for improvement that assigns responsibilities to relevant officers and sets timescales to enable progress to be
effectively monitored.   
Addressing the key challenges to support education recovery and the need for improving attainment 
Educational Services has refreshed its standards for Professional Leadership and Learning 2022-2025. This has updated
its vision to support and develop Moray teachers and practitioners to enable children and young people to be the best they
can be. Attainment results have been monitored and reported to council in a detailed report which outlined achievements
as well as challenges that require to be addressed as the service emerges from the pandemic. A number of other
governance issues have been identified that require further development in the incoming period relating to curriculum
improvements, inspections, and aspects of financial management. 
Managing the fine political balance with new Members through a commitment to collaboration across all
Councillors 
A programme of induction has been delivered for new and returning elected members of the council. Briefing sessions
have been provided as necessary on corporate and service projects as appropriate. Political Leaders have recognised the
importance of collaborative working where possible and this message has been reinforced by the council’s Corporate/
Senior Management Team both informally and in committee reports covering strategic topics including on Best Value and
on the Corporate Overview of Council Priorities. 
Additional developments in the council’s risk management and business continuity arrangements 
A part - time officer has been appointed to assist in the assessment of risks affecting the council, and support the
preparation of business continuity plans to aid delivery of critical services in the event of a disruption. An early stage review
has been completed to inform areas requiring priority attention. The focus has been on the identification of critical functions
and to align business continuity planning with risk management practice, thus ensuring that there is justification for
allocating resources to particular tasks. A plan is in place to progress this work within council services and to develop links
with partners and emergency planning as appropriate.  
Increased numbers of data breaches have highlighted the need for further data protection training 
Data breaches, albeit in small numbers, continue to be highlighted across a number of service areas, potentially a
consequence of staff working in a more diverse way during and since the pandemic. The council has addressed this by
updating its mandatory e-learning module covering General Data Protection Regulations (GDPR) and has developed a
refresher training course for staff to annually measure their understanding of this important topic. Internal audits of
information governance and of compliance with the GDPR requirements were completed and action plans developed and
agreed with management for implementation during 2023/24. 
Implementation of actions arising from the latest Best Value Progress Report from the Accounts Commission 
A Best Value action plan was submitted and approved by council covering a number of themes – increasing the pace of
transformational change, performance reporting, financial planning and sustainability, and improving educational
attainment. The importance of committed decisive leadership was also highlighted as an issue in the Best Value report -
this has been recognised as a political risk in the corporate risk register and in a number of reports to council and its
committees on matters relative to strategic direction and good governance. 
Page 37

Page 38

26
Moray Council Unaudited Annual Account 2022/23
Annual Governance Statement (continued) 
Concluding Remarks 
This Annual Governance Statement summarises the extensive governance arrangements the council has in place to
support delivery of its strategic plans and to secure Best Value in its use of resources. While the statement demonstrates
that these arrangements are comprehensive and broadly fit for purpose, there are multiple challenges ahead that will
impact on how council services are designed and delivered going forward. As these challenges are addressed in the
incoming period, it is recognised that governance arrangements too will need to be adapted, and in our respective roles
as Council Leader and Chief Executive (Head of Paid Service), we are committed to making this happen to ensure the
council and its resources continue to be effectively managed and controlled. 
……………………………….                                                                ………………………………………… 
Cllr Kathleen Robertson                                                    Roderick D Burns
Leader of the Council                                                    Chief Executive
Page 38

Page 39

27
Moray Council Unaudited Annual Account 2022/23
Remuneration Report 
Introduction  
The Local Authority Accounts (Scotland) Regulations 2014 require Local Authorities in Scotland to prepare a Remuneration
Report as part of the statutory Annual Accounts. 
All information disclosed in the tables in this Remuneration Report, with the exception of the Tiered Contribution Pay Rates
table on page 33 and the Trade Union disclosures, will be audited by the appointed auditors, Grant Thornton UK LLP, and
the information reviewed by them to ensure it is consistent with other sections of the Annual Accounts. 
Remuneration Policy for the Leader of the Council, the Civic Leader and Senior Councillors 
The annual salary of the Leader of the Council and the upper limit for the annual salary of the Civic Leader – previously
the role of Convener in 2021/22 - are set out by the Scottish Government in terms of the Local Governance (Scotland) Act
2004 (Remuneration) Amendment Regulations 2022 (SSI No. 2022/18) which amended the Local Governance (Scotland)
Act 2004 (Remuneration) Amendment Regulations 2021 (SSI No. 2020/26). The salary for the Leader of the Council is
£32,622 per annum (2021/22 £31,010) and for the Civic Leader is £24,467 per annum (2021/22 £23,257). 
In terms of the same Regulations, Moray Council can nominate up to nine Senior Councillors (in addition to the Leader of
the Council and the Civic Leader) whose salaries in aggregate must not exceed a specified amount, currently £198,171
(2021/22 £188,375) and whose salaries individually must be on a specified scale, currently £19,571 to £24,467 (2021/22
£18,604 to £23,257).   
In addition to the Senior Councillors of the Council, the Regulations also set out the remuneration payable to Councillors
with the responsibility of a Convener or a Vice-Convener of a Joint Board such as a Valuation Joint Board.  The Regulations
require the remuneration to be paid by the Council of which the Convener or Vice-Convener (as the case may be) is a
member. The Council is also required to pay any pension contributions arising from the Convener or Vice-Convener being
a member of the Local Government Pension Scheme. 
Under the Regulations, remuneration disclosures are to be made for the Leader of the Council, the Civic Leader and any
Councillor designated a Senior Councillor.  In 2022/23, Moray had eight Senior Councillors, (seven committee
chairs/depute chairs and the Leader of the largest opposition group), each paid a salary of £24,467 per annum (2021/22
£23,257).   The Convener of the Grampian Valuation Joint Board was also the Leader of the Council until 5 May 2022 so
no reimbursement for an additional responsibility allowance was required to be paid by the Board for this period. From 26
August 2022 the new Convener has received an allowance for this responsibility which has been reimbursed by the Board. 
The Vice-Chair/Chair of the Moray Integration Joint Board was also the Convener of Moray Council until 5 May 2022 and,
as she already received a Senior Councillor salary, then no additional payment was required. From 18 May 2022 the new
Chair/Vice-Chair has received an allowance for this additional responsibility and this has been funded in full by Moray
Council. 
Table 1 shows the relevant amounts, before tax and other deductions, for each of the persons named for the year to 31
March 2023. All salaries are paid monthly. 
Page 39

Page 40

28
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
TABLE 1:  Remuneration of Senior Councillors and Conveners and Vice-Conveners/Chairs of Joint Boards
Councillor Name Responsibility
Total
Remuneration
2021/22
Salary, Fees
and
Allowances
2022/23
Total
Remuneration
2022/23
£ £ £
Graham Leadbitter Leader of the Council and Convener of Grampian Valuation
Joint Board.  Chair Economic Growth, Housing and
Environmental Sustainability Committee and Chair of
Economic Development and Infrastructure until 5 May 2022
Chair of Audit and Scrutiny Committee from 18 May 2022 and
Joint Leader of the largest Opposition Group from 10 August
2022
31,010              24,379          24,379               
Shona Morrison Convener of the Council and Chair/Vice-Chair, Moray
Integration Joint Board un til 5 May 2022
Joint Leader of the largest Oppostion group from 10 August
2022 (Note 2)
23,257              23,612          23,612               
Kathleen Robertson Leader of the Council from 10 August 2022
Co-Leader of the Council 18 May 2022 until 9 August 2022
Chair of Education, Children's and Leisure Services from 18
May 2022 (Note 1)
-                       27,481          27,481               
John Cowe Civic Leader from 10 August 2022 -                       15,719          15,719               
James Allan Chair of Police and Fire and Rescue Services from 18 May
2022 until 9 August 2022
-                       5,591            5,591                 
Peter Bloomfield Chair of Police and Fire and Rescue Services from 10
August 2022
-                       15,719          15,719               
David Bremner Chair of Planning and Regulatory Services Committee until 5
May 2022
23,257              2,302            2,302                 
Tracy Colyer Chair of Moray Integration Joint Board from 24 May 2022 until
30 September 2022
Vice Chair of Moray Integration Joint Board from 1 October
2022
-                       20,435          20,435               
Theresa Coull Chair of Police and Fire and Rescue Services Committee until
5 May 2022
7,002                2,302            2,302                 
Gordon Cowie Chair of Licensing Committee until 5 May 2022 23,257              2,302            2,302                 
Paula Coy Chair of Police and Fire and Rescue Services until 24
November 2021
15,117              -                   -                        
Amber Dunbar Chair of Housing and Community Safety from 18 May 2022 -                       21,310          21,310               
Timothy Eagle Leader of the largest Opposition group until 5 May 2022 23,257              2,302            2,302                 
Donald Gatt
Chair of Audit and Scrutiny Committee until 5 May 2022
Depute Council Leader from 18 May 2022 until 9 August 2022
Convener of Grampian Valuation Joint Board from 26 August
2022
23,257              22,625          22,625               
David Gordon Chair of Planning and Regulatory Services Committee from 10
August 2022
-                       15,719          15,719               
Louise Nicol Depute Chair of Economic Growth, Housing and
Environmental Sustainability Committee until 5 May 2022
Depute Chair of Police and Fire and Rescue Services until 5
May 2022
23,257              2,302            2,302                 
Marc Macrae Convener from 18 May 2022 until 3 August 2022
Chair, Economic Development and Infrastructure Services
Committee from 18 May 2022
-                       21,310          21,310               
Paul McBain Chair of Licensing Committee from 18 May 2022 -                       21,310          21,310               
Aaron McLean Chair of Education, Communities and Organisational
Development and
Chair of Corporate Committee until 5 May 2022
23,257              2,302            2,302                 
Neil McLennan Co-Leader of the Council 18 May 2022 until 9 August 2022
(Note 1)
-                       6,522            6,522                 
Bridget Mustard Chair of Corporate Committee from 18 May 2022 -                       21,310          21,310               
Sonya Warren Chair of Education Children's and Leisure Services
Committee until 5 May 2022
23,257              2,302            2,302                 
Total 239,185            279,156        279,156             
Page 40

Page 41

29
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
No taxable expenses were paid in 2022/23 or 2021/22. 
Note 1 – It was agreed following the meeting of Moray Council on 18 May 2022 that Leadership of the Council would be
shared between Councillor Robertson and Councillor McLennan. The additional responsibility allowance for this post was
shared equally between the two councillors from this date until 10 August 2022 when Councillor Robertson was appointed
sole leader. From 10 August 2022 Councillor McLennan returned to the basic councillor salary. 
Note 2 – It was agreed following the meeting of Moray Council on 18 May 2022 that Leadership of the largest Opposition
Group would be shared between Councillor Leadbitter and Councillor Morrison. As Councillor Leadbitter already received
Senior Councillor remuneration as Chair of Audit and Scrutiny Committee the full additional responsibility allowance was
received by Councillor Morrison. 
Note 3 – At a meeting of Moray Council on 10 August 2022 it was approved to amend the position of Convener to Civic
Leader. 
TABLE 2: Remuneration paid to Councillors   
The annual return of Councillors’ salaries and expenses is available to view on the Council’s website at
http://www.moray.gov.uk/moray_standard/page_90017.html 
The annual return of Councillors’ salaries and expenses is compiled under Scottish Local Authority Remuneration
Committee (SLARC) guidance for public records whereas the Remuneration Report is compiled under a Scottish Statutory
Instrument (SSI). 
The Council paid the following salaries, allowances and expenses to all Councillors (including the Senior Councillors
above) during the year. 
Type of Remuneration 2021/22 2022/23
£ £
Salaries 531,247   563,901  
Expenses 4,254       12,857    
Total 535,501   576,758   
Remuneration Policy for Senior Officers 
The salaries of Senior Officers are set by reference to national arrangements.  The Scottish Joint Negotiating Committee
(SJNC) for Local Authority Services sets out the salary for the Chief Executives of Scottish Local Authorities (SPPA). 
Circular CO/152 was issued 28 February 2023 and covers salary scales to be paid to Chief Officers for the period of 1
April 2022 to 31 March 2023.  Depute Chief Executives receive 84% of the Chief Executive’s salary. The Depute Chief
Executive for Education, Communities and Organisational Development is also the Presiding Officer and therefore the
amount included in table 3 is higher than this.  Moray Council does not pay bonuses or performance related pay.   
The Regulations define a Senior Officer as an employee who meets one or more of the following criteria: 
i) A person who has responsibility for the management of the Local Authority to the extent that the person has the
power to direct or control the major activities of the Authority, whether solely or collectively with other persons;
ii) A person who holds a post that is politically restricted by reason of section 2(1) (a), (b) or (c) of the Local
Government and Housing Act 1989; or
iii) A person whose annual remuneration, including any annual remuneration from a Local Authority subsidiary body,
is £150,000 or more. 
The term remuneration means gross salary, fees and bonuses, allowances and taxable expenses, and compensation for
loss of employment.  Remuneration details are shown in Table 3. The table shows the relevant amounts, before tax and
other deductions, for each of the persons named for the year to 31 March 2023. Salaries are paid monthly. 
Page 41

Page 42

30
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
TABLE 3:  Remuneration of Senior Employees of the Council 
Name Post Title
Total Remuneration
2021/22
Salary, fees
and
allowances
2022/23
Total
Remuneration
2022/23
£ £ £
Roderick D Burns Chief Executive 117,449                    123,089       123,089             
Rhona Gunn Depute Chief Executive for
Economy, Environment and
Finance 99,038                       104,010       104,010             
Denise Whitworth Depute Chief Executive for
Education, Communities and
Organisational Development 102,472                    107,382       107,382             
Vivienne Cross Chief Education Officer 94,369                       87,498         87,498                
Jane Mackie Head of Community Care (Chief
Social Work Officer) until 31
October 2022 84,881                       48,795         48,795                
Tracy Stephen Head of Community Care (Chief
Social Work Officer) from 1
November 2022 -                                  40,705         40,705                
Alasdair McEachan Head of Governance, Strategy and
Performance (Monitoring Officer) 83,436                       87,043         87,043                
Lorraine Paisey Chief Financial Officer (s95) 83,057                       86,860         86,860                
Total 664,702                    685,382       685,382               
No taxable expenses were paid in 2022/23 or 2021/22. 
Pension Entitlement 
Pension benefits for Councillors and Local Government employees are provided through the Local Government Pension
Scheme (LGPS) and for teachers and former teachers through the Scottish Public Pensions Agency.  The pension is
based on the person’s pensionable service (how long he or she has been a member of the pension scheme) and his or
her pay.  For Councillors, the pension is based on “career average” - the aggregate of each year’s pay (adjusted by
inflation) is divided by the total number of years and part years they have been a member of the LGPS. 
For officers, the pension is based on a career average from 1 April 2015.  For service before this date, the annual pension
is calculated by dividing their pay by 80 (60 for service after 31 March 2009) and multiplying this by their total membership. 
The normal retirement age (NRA) for service post 1 April 2015 is the same as for the state pension; the NRA for service
pre 1 April 2015 is 65.  Pensions payable are increased annually in line with changes in the Pensions (Increase) Act 1971
and Section 59 of the Social Security Pension Act 1975.  Members may opt to give up (commute) pension for a lump sum
up to the limit set by the Finance Act 2004. 
Page 42

Page 43

31
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
LGPS regulations require that contribution rates are applied according to ranges of pay bands rising from 5.5% to 12%
depending on the member’s rate of pensionable pay. The tables for the allocation of rates for 2021/22 and 2022/23 is
shown below and can be found on the Scottish Public Pensions Agency website: 
https://pensions.gov.scot/sites/default/files/2022-02/LGPS_Circular_Tiered_Contribution_Guidance_-_Version_16.pdf  
Tiered Contribution Pay Rates 
Pensionable Pay 2021/22 Rate (%)
2021/22
Pensionable Pay 2022-23 Rate (%)
2022/23
On earnings up to and including £22,300  5.50% On earnings up to and including £23,000  5.50%
On earnings above £22,301 and up to £27.300 7.25% On earnings above £23,001 and up to £28,100 7.25%
On earnings above £27,301 and up to £37,400 8.5% On earnings above £28,101 and up to £38,600 8.5%
On earnings above £37,401 and up to £49,900 9.5% On earnings above £38,601 and up to £51,400 9.5%
On earnings of £49,901 and above 12% On earnings of £51,401 and above 12% 
The value of benefits in Tables 4 and 5 below have been provided by the North East Scotland Pension Fund (NESPF) and
are calculated on the basis of the age at which the person will first become entitled to a full pension on retirement without
reduction on account of its payment at that date; without exercising any option to commute pension entitlement into a lump
sum and without any adjustment for the effects of future inflation.  The pension figures shown relate to the benefits that
the person has accrued as a consequence of their total Local Government service and not just their current appointment. 
The pension entitlements for Senior Councillors for the year to 31 March 2023 are shown in the table below, together with
the contribution made by the Council to each Senior Councillor’s pension during the year. 
Page 43

Page 44

32
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
TABLE 4:  Senior Councillors 
For the year to
31 March
2022
For the year to
31 March
2023
As at 31
March 2023
Difference
from March
2022
£ £ £'000 £'000
Councillor NaResponsibility
Graham
Leadbitter
Leader of the Council and Convener of Grampian Valuation Joint Board. 
Chair Economic Growth, Housing and Environmental Sustainability
Committee and Chair of Economic Development and Infrastructure until
5 May 2022
Chair of Audit and Scrutiny Committee from 18 May 2022 and Joint
Leader of the largest Opposition Group from 10 August 2022
5,985               4,705                Pension
Lump
Sum 
8
2
1
-
Shona
Morrison
Convener of the Council and Chair/Vice-Chair, Moray Integration Joint
Board until 5 May 2022
Joint Leader of the largest Oppostion group from 10 August 2022
4,489               4,557                Pension
Lump
Sum 
3
-
1
-
Kathleen
Robertson
Leader of the Council from 10 August 2022
Co-Leader of the Council 18 May 2022 until 9 August 2022
Chair of Education, Children's and Leisure Services from 18 May 2022
-                   5,304                Pension
Lump
Sum 
1
-
John
Cowe
Civic Leader from 10 August 2022 -                   3,034                Pension
Lump
Sum 
7
-
2
-
James
Allan
Chair of Police and Fire and Rescue Services from 18 May 2022 until 9
August 2022
-                   1,079                Pension
Lump
Sum 
4
-
1
-
Peter
Bloomfield
Chair of Police and Fire and Rescue Services from 10 August 2022 -                   3,034                Pension
Lump
Sum 
-
-
-
-
In-year pension contributions Accrued pension benefits
Page 44

Page 45

33
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
TABLE 4:  Senior Councillors (continued) 
For the year to
31 March 2022
For the year to
31 March 2023
As at 31
March 2023
Difference
from March
2022
£ £ £'000 £'000
Councillor NaResponsibility
David
Bremner
Chair of Planning and Regulatory Services Committee until 5 May 2022 4,489 444                    Pension
Lump
Sum 
2
-
-
-
Tracy
Colyer
Chair of Moray Integration Joint Board from 24 May 2022 until 30
September 2022
Vice Chair of Moray Integration Joint Board from 1 October 2022
-                    3,944                 Pension
Lump
Sum 
-
-
-
-
Theresa
Coull
Chair of Police and Fire and Rescue Services Committee until 5 May
2022
1,351 444                    Pension
Lump
Sum 
2
-
-
-
Gordon
Cowie
Chair of Licensing Committee until 5 May 2022 4,489 444                    Pension
Lump
Sum 
5
-
-
-
Paula Coy Chair of Police and Fire and Rescue Services until 24 November 2021 2,918 -                     Pension
Lump
Sum 
2
-
-
-
Amber
Dunbar
Chair of Housing and Community Safety from 18 May 2022 -                    4,113                 Pension
Lump
Sum 
-
-
-
-
Timothy
Eagle
Leader of the largest Opposition group until 5 May 2022 4,489 444                    Pension
Lump
Sum 
2
-
-
-
Donald
Gatt
Chair of Audit and Scrutiny Committee until 5 May 2022
Depute Council Leader from 18 May 2022 until 9 August 2022
Convener of Grampian Valuation Joint Board from 26 August 2022
4,489                4,367                 Pension
Lump
Sum 
3
-
1
-
David
Gordon
Chair of Planning and Regulatory Services Committee from 10 August
2022
-                    3,034                 Pension
Lump
Sum 
-
-
-
-
In-year pension contributions Accrued pension benefits
Page 45

Page 46

34
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
TABLE 4:  Senior Councillors (continued) 
For the year to
31 March 2022
For the year to
31 March 2023
As at 31
March 2023
Difference
from March
2022
£ £ £'000 £'000
Councillor NaResponsibility
Marc
Macrae
Convener from 18 May 2022 until
Chair, Economic Development and Infrastructure Services Committee
from 18 May 2022
-                    4,113                 Pension
Lump
Sum
2
-
-
Paul
McBain
Chair of Licensing Committee from 18 May 2022 -                    4,113                 Pension
Lump
Sum
-
-
-
-
Aaron
McLean
Chair of Education, Communities and Organisational Development and
Chair of Corporate Committee until 5 May 2022
4,489                444                    Pension
Lump
Sum
4
-
-
-
Neil
McLennan
Co-Leader of the Council 18 May 2022 until 9 August 2022 -                    1,259                 Pension
Lump
Sum
-
-
-
-
Bridget
Mustard
Chair of Corporate Committee from 18 May 2022 -                    4,113                 Pension
Lump
Sum
-
-
-
-
Louise
Nicol
Depute Chair of Economic Growth, Housing and Environmental
Sustainability Committee until 5 May 2022
Depute Chair of Police and Fire and Rescue Services until 5 May 2022
4,489                444                    Pension
Lump
Sum
2
-
-
-
Sonya
Warren
Chair of Education Children's and Leisure Services Committee until 5
May 2022
4,489                444                    Pension
Lump
Sum
3
-
-
-
Total 46,166 53,877 52 6
In-year pension contributions Accrued pension benefits
Page 46

Page 47

35
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
TABLE 5:  Senior Employees 
The pension entitlements of Senior Employees for the year to 31 March 2023 are shown in the table below, together with
the contribution made by the Council to each Senior Employee’s pension during the year. 
For the year to
31 March 2022
For the year to
31 March 2023
As at 31
March 2023
Difference
from March
2022
£ £ £'000 £'000
Name Post Title
Roderick D Burns Chief Executive 22,661             23,750              Pension
Lump
Sum 
73
123
5
6
Rhona Gunn Depute Chief Executive
for Economy,
Environment and
Finance
19,109             20,065              Pension
Lump
Sum 
39
35
4
1
Denise Whitworth Depute Chief Executive
for Education,
Communities and
Organisational
Development
19,772             20,720              Pension
Lump
Sum 
50
73
3
4
Vivienne Cross Chief Education Officer 17,291             16,872              Pension
Lump
Sum 
13
-
2
-
Jane Mackie Head of Community
care (Chief Social Work
Officer) until 31 October
2022
16,259             9,569                 Pension
Lump
Sum 
44
68
1
-
Tracy Stephen Head of Community
care (Chief Social Work
Officer) from 1
November 2022
-                         7,476                 Pension
Lump
Sum 
7
-
2
-
Alasdair McEachan Head of Governance,
Strategy and
Performance
16,004             16,769              Pension
Lump
Sum 
36
41
3
2
Lorraine Paisey Chief Financial Officer
(s95 officer)
16,022             16,758              Pension
Lump
Sum 
39
54
3
3
Total 127,118           131,979           695              39                
In-year pension contributions Accrued pension benefits
All senior employees shown in the tables above are members of the Local Government Pension Scheme (LGPS). 
The pension information for the Chief Education Officer excludes her teacher’s pension as information was not available
from the Scottish Public Pensions Agency (SPPA). 
Page 47

Page 48

36
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
Remuneration of Officers receiving more than £50,000 
The following table provides details of the number of people paid by the Council whose remuneration is £50,000 or more. 
The table includes the remuneration of the Senior Employees detailed above. 
TABLE 6:  General Disclosure by Pay Band 
Remuneration Band
2021/22 2022/23
£50,000-£54,999 144 150
£55,000-£59,999 56 101
£60,000-£64,999 33 54
£65,000-£69,999 19 46
£70,000-£74,999 3 19
£75,000-£79,999 3 4
£80,000-£84,999 10 4
£85,000-£89,999 1 11
£90,000-£94,999 1 1
£95,000-£99,999 1 -
£100,000-£104,999 1 2
£115,000-£119,999 1 -
£120,000-£124,999 - 1
Total 273 393
Number of Employees
Exit Packages of Employees 
The Council has agreed one exit package as detailed in Table 7.  Exit packages are split between compulsory
redundancies and other departures.  The figures shown include redundancy, settlement costs for loss of employment and
payments to the pension fund for early retirements agreed by Committee.  The Council only agrees exit packages where
they are consistent with wider workforce planning and service delivery objectives and where the savings accruing from an
individual ceasing employment with the Council exceed the costs of the exit package within an acceptable period. 
TABLE 7:  Exit Packages 
Banding
Compulsory
Redundancies
Other
Departures Total Cost
Compulsory
Redundancies
Other
Departures Total Cost
Number of
Employees
Number of
Employees £
Number of
Employees
Number of
Employees £
£0-£20,000 4                          - 3,925       -                         -                  -               
£40,001-£60,000 -                           1                  47,432     -                         -                  -               
£120,000-£140,000 -                           -                   -                1                        -                  135,465  
Total 4                          1                  51,357     1                        -                  135,465  
2021/22 2022/23
Page 48

Page 49

37
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
Termination Benefits 
During 2022/23 the Council terminated the contract of one employee.  The contract was terminated as a result of
redundancy.  The cost to the Council was £0.135m comprising £0.025m of redundancy payments and £0.102m strain
on pension fund costs (2021/22 £0.051m) which were reimbursed in full by the Scottish Government. No settlement
costs for loss of employment were agreed in 2021/22 or 2022/23. 
Trade Union (Facility Time Publication Requirements) Regulations 2017 
The following tables show the information required to be published under the Trade Union (Facility Time Publication
Requirements) Regulations 2017. 
Table 8: Relevant Union Officials 
What was the total number of your employees who were relevant union officials during the relevant period? 
Teaching Non-Teaching Teaching Non-Teaching
16 10.92
Number of employees who were relevant union
officials during the relevant period Full-time equivalent employee number
2022/23 2022/23
Table 9: Percentage of Time Spent on Facility Time 
How many of your employees who were relevant union officials employed during the relevant period spent a) 0%, 
b) 1%-50%, c) 51%-99% or d) 100% of their working hours on facility time? 
Percentage of time
Teaching Non-Teaching
0% -               4                     
1%-50% 11
51%-99% -
100% -               1                     
Number of employees
2022/23
Page 49

Page 50

38
Moray Council Unaudited Annual Account 2022/23
Remuneration Report (continued) 
Table 10: Percentage of Pay Bill Spent on Facility Time 
Provide the figures requested in the first column of the table below to determine the percentage of your total pay bill spent
on paying employees who were relevant union officials for facility time during the relevant period. 
Teaching Non-Teaching
Provide the total cost of facility time £62,159
Provide the total pay bill £116,290,000
Provide the percentage of the total pay bill spent on facility time calculated as:
(total cost of facility time/total pay bill) x 100 % 0.05%
2022/23
Table 11: Paid Trade Union Activities 
As a percentage of total paid facility time hours, how many hours were spent by employees who were relevant union
officials during the relevant period on paid trade union activities? 
Teaching Non-Teaching
Time spent on paid trade union activities as a percentage of total paid facility time
hours caluclated as:
(total hours spent on trade union activities by relevant union officials during the
relevant period/total paid facility time hours) x 100 % 13.27%
2022/23
Councillor Kathleen Robertson       Roderick D Burns 
Leader of the Council        Chief Executive 
Page 50

Page 51

39
Moray Council Unaudited Annual Account 2022/23
Comprehensive Income and Expenditure Statement 
This Statement shows the accounting cost for the year ended 31 March 2023 of providing services in accordance with generally accepted accounting practices, rather than the amount
to be funded from taxation. The Council raises taxation to cover expenditure in accordance with regulations; this may be different from the accounting cost. The taxation position is shown
in the Movement in Reserves Statement and the Expenditure and Funding Analysis note 8. 
Group Council Group Group
Expenditure Income Net Net Net Net Expenditure Income Net Net
Restated Restated
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
91,406 (13,271) 78,135 78,260 76,860 76,985 Education  104,549 (12,331) 92,218 92,218
29,595 (4,406) 25,189 25,189 24,931 24,931 Education Resources & Communities 31,766 (5,107) 26,659 26,844
20,342 (1,885) 18,457 18,504 18,456 18,503 Social Work 20,782 (3,392) 17,390 17,439
14,242 (9,006) 5,236 5,259 4,544 4,567 General Services Housing and Property Services 16,745 (9,489) 7,256 7,269
56,486 (14,792) 41,694 41,730 38,250 38,286 Environmental & Commercial Services 59,282 (17,463) 41,819 41,972
9,648 (4,543) 5,105 5,105 5,065 5,065 Economic Growth & Development 10,358 (5,222) 5,136 5,136
7,118 (400) 6,718 6,718 6,432 6,432 HR, ICT & Organisational Development 7,450 (383) 7,067 7,067
20,175 (14,045) 6,130 6,719 6,130 6,156 Governance, Strategy & Performance 20,306 (13,233) 7,073 7,825
3,332 (831) 2,501 2,517 2,509 2,525 Financial Services 3,449 (888) 2,561 2,561
1,904 (142) 1,762 1,813 1,762 1,813 Other 1,825 (205) 1,620 1,633
119,454 (66,160) 53,294 53,294 53,144 53,144 Health and Social Care 135,749 (73,682) 62,067 62,067
14,618 (21,229) (6,611) (6,611) (6,359) (6,359) Housing Revenue Account 18,604 (21,770) (3,166) (3,166)
388,320 (150,710) 237,610 238,497 231,724 232,048 Cost Of Services 430,865 (163,165) 267,700 268,865
2021/22 2022/23
Council Council
Page 51

Page 52

40
Moray Council Unaudited Annual Account 2022/23
Comprehensive Income and Expenditure Statement (continued) 
Group Council Group Group
Expenditure Income Net Net Net Net Expenditure Income Net Net
Restated Restated Restated
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
388,320 (150,710) 237,610 238,497 231,724 232,048 Cost Of Services brought forward 430,865 (163,165) 267,700 268,865
8,707 8,740 8,707 8740 Other Operating Expenditure (Note 12) 492 1123
13,157 12,869 13,157 12,559 Financing and Investment Income and
Expenditure (Note 13)
12,856 12,544
(243,650) (243,650) (243,650) (243,650) Taxation and Non-Specific Grant Income
(Note 14)
(261,652) (261,652)
- (5,087) - (5,088) Associates accounted for on an equity
basis
- 6,212
15,824 11,369 9,938 4,609 Deficit on Provision of Services 19,396 27,092
(124,386) (124,439) (135,570) (138,556) (Surplus)/Deficit on revaluation of Property,
Plant and Equipment (Notes 15 & 23)
(60,399) (62,406)
- (216) - (216) (Surplus)/Deficit on revaluation of
available for sale financial assets
- 81
(13,274) (13,274) (13,274) (13,274) Remeasurement of the net defined benefit
liability (Note 28 & 42)
(231,985) (231,985)
- 8 - 8 Share of other Comprehensive (Income)
and Expenditure of Associates
- (1,897)
(137,660) (137,921) (148,844) (152,038) Other (Income)/Expenditure (292,384) (296,207)
(121,836) (126,552) (138,906) (147,429) Total Comprehensive Net (Income)/Expenditure (272,988) (269,115)
2021/22 2022/23
Council Council
Page 52

Page 53

41
Moray Council Unaudited Annual Account 2022/23
Movement in Reserves Statement 
This Statement shows the movement in the year on the different reserves held by the Council, analysed into usable reserves (i.e. those that can be applied to fund expenditure or reduce
local taxation) and unusable reserves.  The Statement shows how the movements in year are broken down between gains and losses incurred in accordance with generally accepted
accounting practices and the statutory adjustments required to return to the amounts chargeable to Council tax (or housing rents) for the year.  The Net Increase or Decrease line shows
the statutory General Fund Balance and Housing Revenue Account Balance movements in the year following those adjustments. 
General
Fund
Balance
Housing
Revenue
Account
Capital
Receipts
Reserve
Capital
Grants
and
Receipts
Unapplied
Account
Revenue
Statutory
Fund
Total
Usable
Reserves
Unusable
Reserves
Total
Authority
Reserves
Authority's
Share of
Subsidiaries
Reserves
Authority's
Share of
Associates
Reserves
Total
Group
Reserves
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Balance at 31 March 2021 41,872 2,401 984 3,804 4,134 53,195 624,332 677,527 30,278 3,493 711,298
Movement in Reserves 2021/22 (restated)
Total Comprehensive Expenditure and
Income
(14,652) 4,714 - - - (9,938) 148,844 138,906 3,443 5079 147,428
Adjustments to usable reserves permitted
by accounting standards
1,799 4,124 - - - 5,923 (5,923) - - - -
Adjustments between accounting basis &
funding basis under regulations (Note 10)
18,006 (9,424) - 1,281 - 9,863 (9,863) - - - -
Net increase/(decrease) before
transfers tofrom earmarked and other
statutory reserves
5,153 (586) - 1,281 - 5,848 133,058 138,906 3,443 5,079 147,428
Transfers to/(from) statutory reserves (1,616) 650 4 944 18 - - - - - -
Increase/Decrease in 2021/22 3,537 64 4 2,225 18 5,848 133,058 138,906 3,443 5,079 147,428
Balance at 31 March 2022 45,409 2,465 988 6,029 4,152 59,043 757,390 816,433 33,721 8,572 858,726
Note
Minority Interest 731 731
Total Reserves as per Balance Sheet 34,452 859,457
Page 53

Page 54

42
Moray Council Unaudited Annual Account 2022/23
Movement in Reserves Statement (continued) 
General
Fund
Balance
Housing
Revenue
Account
Capital
Receipts
Reserve
Capital
Grants
and
Receipts
Unapplied
Account
Revenue
Statutory
Fund
Total
Usable
Reserves
Unusable
Reserves
Total
Authority
Reserves
Authority's
Share of
Subsidiaries
Reserves
Authority's
Share of
Associates
Reserves
Total
Group
Reserves
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Balance at 31 March 2022 45,409 2,465 988 6,029 4,152 59,043 757,390 816,433 33,721 8,572 858,726
Movement in Reserves 2022/23
Total Comprehensive Expenditure and
Income
(28,703) 9,307 - - - (19,396) 292,384 272,988 442 -4300 269,130
Adjustments to usable reserves
permitted by accounting standards
7,634 2,844 - - - 10,478 (10,478) - - - -
Adjustments between accounting basis
& funding basis under regulations
(Note 10)
19,821 (10,814) - 1,014 - 10,021 (10,021) - - - -
Net increase/(decrease) before
transfers tofrom earmarked and
other statutory reserves
(1,248) 1,337 - 1,014 - 1,103 271,885 272,988 442 (4,300) 269,130
Transfers to/(from) statutory reserves 1,537 (1,384) 4,360 (4,898) 87 (298) 298 - - - -
Increase/Decrease in 2022/23 289 (47) 4,360 (3,884) 87 805 272,183 272,988 442 (4,300) 269,130
Balance at 31 March 2023 45,698 2,418 5,348 2,145 4,239 59,848 1,029,573 1,089,421 34,163 4,272 1,127,856
Note
Minority Interest 716 716
Total Reserves as per Balance Sheet 34,879 1,128,572
Page 54

Page 55

43
Moray Council Unaudited Annual Account 2022/23
Balance Sheet 
The Balance Sheet shows the value as at the Balance Sheet date of the assets and liabilities recognised by the Council. 
The net assets of the Council (assets less liabilities) are matched by the reserves held by the Council.  Reserves are
reported in two categories.  The first category of reserves are Usable Reserves, i.e. those reserves that the Council may
use to provide services, subject to the need to maintain a prudent level of reserves and any statutory limitations on their
use (for example the Capital Receipts Reserve may only be used to fund capital expenditure or repay debt).  The second
category of reserves are those that the Council is not able to use to provide services (Unusable Reserves).  This category
of reserves includes reserves that hold unrealised gains and losses (for example the Revaluation Reserve, where amounts
would only become available to provide services if the assets are sold) and reserves that hold differences shown in the
Movement in Reserves Statement line “Adjustments between accounting basis and funding basis under regulations”. 
Notes
Council Group Council Group Council Group
Restated Restated
£000 £000 £000 £000 £000 £000
1,158,116 1,176,956  1,175,180  1,197,515 Property, Plant & Equipment 15 1,248,239 1,271,075
1,151 1,355 1,151 1,355 Heritage Assets 16 1,151 1,355
222 2,596 222 2,907 Investment Property 17 375 3,046
30 30 36 36 Intangible Assets 18 29 29
- 3,079 - 3,079 Long Term Investments - 2,998
- 8,572 - 8,572 Investments in Associates - 4,272
- - - - Pension Asset 42 161,095 161,095
484 484 484 484 Long Term Debtors 19 439 439
1,160,003 1,193,072 1,177,073 1,213,948 Long Term Assets 1,411,328 1,444,309
1,642 1,643 1,642 1,643 Inventories 20 1,814 1,815
17,017 17,031 17,017 17,031 Short Term Debtors 21/22 16,243 16,261
877 877 877 877 Assets held for sale 23 463 463
15,409 15,409 15,409 15,409 Cash and Cash Equivalents 24 11,034 13,230
34,945 34,960 34,945 34,960 Current Assets 29,554 31,769
(75,973) (75,973) (75,973) (75,973) Short Term Borrowing 19 (88,123) (88,123)
(48,265) (42,131) (48,265) (42,131) Short Term Creditors 25 (55,297) (51,342)
(649) (649) (649) (649) Donated Inventories Account 20 (649) (649)
(124,887) (118,753) (124,887) (118,753) Current Liabilities (144,069) (140,114)
(149) (149) (149) (149) Provisions 26 (149) (149)
(160,784) (160,784) (160,784) (160,784) Long Term Borrowing 19 (152,897) (152,897)
(55,207) (55,207) (55,207) (55,207) Other Long Term Liabilities 19 (54,346) (54,346)
(54,558) (54,558) (54,558) (54,558) Pensions Liability 42 - -
(270,698) (270,698) (270,698) (270,698) Long Term Liabilities (207,392) (207,392)
799,363 838,581 816,433 859,457 Net Assets 1,089,421 1,128,572
31 March 2022 31 March 2022 31 March 2023
Page 55

Page 56

44
Moray Council Unaudited Annual Account 2022/23
Balance Sheet (continued) 
Notes
Council Group Council Group Council Group
Restated Restated Restated
£000 £000 £000 £000 £000 £000
45,409 56,241 45,409 56,545 General Fund Balance 27 45,698 55,017
2,465 2,458 2,465 2,465 Housing Revenue Account 27 2,418 2,418
988 988 988 988 Capital Receipts Reserve 27 5,348 5,348
6,029 6,029 6,029 6,029
Capital Grants & Receipts
Unapplied Account 27/29 2,145 2,145
4,152 4,152 4,152 4,152 Revenue Statutory Funds 27 4,239 4,239
59,043 69,868 59,043 70,179 Usable Reserves 59,848 69,167
406,094  421,942  417,278  436,621 Revaluation Reserve 28 466,344   486,208  
402,325  405,567  408,211  411,453 Capital Adjustment Account 28 416,000   419,242  
(5,716)     (5,716)     (5,716)     (5,716)   
Financial Instruments Adjustment
Account 28 (5,404)       (3,666)     
(7,825)     (7,825)     (7,825)     (7,825)   
Employee Statutory Adjustment
Account 28 (8,462)       (8,462)     
(54,558)   (54,558)   (54,558)   (54,558)  Pensions Reserve 28 161,095   161,095  
740,320 759,410 757,390 779,975 Unusable Reserves 1,029,573 1,054,417
- 8,572 - 8,372 Share of Associates Reserves - 4,272
- 731 - 731 Minority Interest - 716
799,363 838,581 816,433 859,257 Total Reserves 1,089,421 1,128,572
31 March 2022 31 March 2022 31 March 2023
The notes on pages 48 to 101 form part of the financial statements. 
Lorraine Paisey CA 
Chief Financial Officer 
The unaudited Annual Accounts were issued on 28 June 2023 by Lorraine Paisey, Chief Financial Officer. 
Page 56

Page 57

45
Moray Council Unaudited Annual Account 2022/23
Cash Flow Statement 
The Cash Flow statement shows the changes in cash and cash equivalents of the Council during the financial year.  The
statement shows how the Council generates and uses cash and cash equivalents by classifying cash flows as operating,
investing and financing activities.  The amount of cash flows arising from operating activities is a key indicator of the extent
to which the operations of the Council are funded by way of taxation and grant income or from the recipients of services
provided by the Council. Investing activities represent the extent to which cash outflows have been made for resources
which are intended to contribute to the Council's future service delivery.  Cash flows arising from financing activities are
useful in predicting claims on the future cash flows by providers of finance (i.e. borrowing) to the Council. 
Council Group Council Group Council Group
Restated Restated
£000 £000 £000 £000 £000 £000
(15,824) (16,456) (9,938) (9,697) Net deficit on the provision of services (19,396) (20,880)
61,581 62,213 55,695 55,936
Adjust net deficit on the provision of
services for non cash movements 53,106 54,590
(16,492) (16,492) (16,492) (16,492)
Adjust for items included in the net deficit
on the provision of services that are
investing and financing activities (22,998) (22,998)
29,265 29,265 29,265 29,747 Net cash flows from Operating Activities 10,712 10,712
(23,115) (23,115) (23,115) (23,115) Investing Activities (Note 31) (21,014) (21,014)
(21,096) (21,096) (21,096) (21,096) Financing Activities (Note 32) 5,927 5,927
(14,946) (14,946) (14,946) (14,464)
Net increase or (decrease) in cash and
cash equivalents (4,375) (4,375)
30,355 30,355 30,355 30,355
Cash and cash equivalents at the
beginning of the financial year 15,409 15,409
15,409 15,409 15,409 15,409
Cash and cash equivalents at the end of
the financial year (Note 24) 11,034 11,034
(14,946) (14,946) (14,946) (14,946) (4,375) (4,375)
2021/22 2021/22 2022/23
Page 57

Page 58

46
Moray Council Unaudited Annual Account 2022/23
Notes to the Accounts 
Note 1 Accounting Policies 
1. General
The Local Authority Accounts (Scotland) Regulations 2014 require the Council to prepare an annual statement of accounts. 
Section 12 of the Local Government in Scotland Act 2003 requires such accounts to be prepared in accordance with proper
accounting practices. 
These practices primarily comprise the Code of Practice on Local Authority Accounting in the United Kingdom 2022/23,
supported by International Financial Reporting Standards (IFRS).  These are issued jointly by CIPFA and the Local
Authority (Scotland) Accounts Advisory Committee (LASAAC) and are designed to give a “true and fair view” of the financial
performance of the Council and its Group.  The Annual Accounts have been prepared on a “going concern” basis.  The
accounting convention adopted in the Annual Accounts is principally historic cost, modified by the revaluation of certain
categories of non-current and financial assets. 
2. Accruals of Expenditure and Income
Income and Expenditure activities are accounted for in the year in which they take place, not simply when cash payments
are made or received. 
Where income and expenditure has been recognised but cash has not been received or paid, a debtor or creditor for the
relevant amount is recorded in the balance sheet. Where the debts may not be settled, the balance of debtors is written
down and a charge made to revenue for the income that might not be collected. 
3. Bad and Doubtful Debts
Amounts owed to the Council are reviewed annually and provision made for possible non-collection of bad or doubtful
debts.  All debts greater than 12 months old are provided for in full.  For debt aged between 6 months and 12 months old,
other than those relating to Council Tax arrears and Non Domestic Rates collected on behalf of the Scottish Government,
provision of 50% is made. No provision is made on debt less than 12 months old relating to Council Tax arrears and Non
Domestic Rates collected on behalf of the Scottish Government. 
4. Borrowing Costs
The Council capitalises borrowing costs incurred whilst material assets are under construction.
5. Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty on notice of not
more than 24 hours.  Cash equivalents are investments that mature in three months or less from the balance sheet date
and that are readily convertible to known amounts of cash with insignificant risk of change in value. 
In the Cash Flow Statement, cash and cash equivalents are shown net of bank overdrafts that are repayable on demand.
These form an integral part of the Council’s cash management. 
6. Charges to Revenue for Non-Current Assets
Services are debited with the following amounts to record the cost of holding non-current assets during the year:
• Depreciation attributable to the assets used by the relevant service.
• Revaluation and impairment losses on assets used by the service where there are no accumulated gains in the
Revaluation Reserve against which the losses can be written off.
• Amortisation of intangible non-current assets attributable to the service. 
7. Contingent Assets and Liabilities
A contingent asset or liability arises where an event has taken place that gives the Council a possible benefit or obligation
whose existence will only be confirmed by the occurrence or otherwise of uncertain future events not wholly within the
control of the Council.  Contingent assets or liabilities also arise in circumstances where a provision would otherwise be
made but either it is not probable that an outflow/inflow or resources will be required or the amount of the benefit/obligation
cannot be measured reliably. 
Contingent assets and liabilities are not recognised in the Balance Sheet but disclosed in a Note to the Accounts if they
are deemed material. 
8. Employee Benefits Payable during Employment
Short-term employee benefits such as salaries, wages, overtime and paid annual leave for current employees are
recognised as an expense in the year in which employees render service to the Council.  An accrual is made for the cost
of holiday entitlements earned by employees but not taken before the year-end and which employees can carry forward
into the next financial year. 
Page 58

Page 59

47
Moray Council Unaudited Annual Account 2022/23
Note 1 Accounting Policies (continued) 
9. Fair Value Measurement
The Council measures the carrying value of some of its non-financial assets, mostly surplus assets, at fair value at each
reporting date.  Fair value is broadly the amount for which an asset could be exchanged or a liability settled. 
The inputs to the measurement techniques are categorised in accordance with the following three levels:
• Level 1 inputs - quoted prices (unadjusted in active markets) for identical assets (or liabilities) that the local
authority can access at the measurement date.
• Level 2 inputs - inputs other than quoted prices included within Level 1 that are observable for the asset (or
liability) either directly or indirectly.
• Level 3 inputs - unobservable inputs for the asset (or liability). 
10. Government Grants and Contributions
Government grants and third party contributions and donations are recognised as due to the Council when there is
reasonable assurance that:
• The Council will comply with the conditions attached to the payments and
• The grants or contributions will be received. 
Monies advanced as grants and contributions for which conditions have not been satisfied are carried in the Balance Sheet
as creditors.  Where conditions are satisfied, the grant or contribution is credited to the relevant service line (for revenue
grants) or Taxation and Non-Specific Grant Income (for capital grants).  Where capital grants are credited to the
Comprehensive Income and Expenditure Statement (CIES), they are reversed out in the General Fund balance in the
Movement in Reserves Statement (MIRS). 
11. Impairment
Assets are assessed at each year end for any indication that an asset may be impaired. Where indications exist and any
possible differences are estimated to be material, the recoverable amount of the asset is estimated and, where this is less
than the carrying amount of the asset an impairment loss is recognised. 
12. Inventories
Depending on the category of inventory, the values included in the Annual Accounts are either on the basis of the average
price or the cost of the last item received.  Work in Progress is stated at cost or value of work done. Although the Code
recommends different valuation bases for these items, the effect on final valuations is immaterial. 
13. Loans Fund
A Loans Fund is maintained under powers contained in the Local Authority (Capital Finance and Accounting) (Scotland)
Regulations 2016.  All loans raised by the Council are paid into the Fund and all advances to finance capital expenditure
are made from the Fund except for capital projects financed directly from Revenue Accounts.  The basis of recharging for
loans is by half-yearly instalments on an annuity basis. This is only the case for pre 1 April 2022 and new loans fund
repayments now follow option 3 permitted by Finance Circular 7/2016. Loans Fund interest and expenses have been
charged to the CIES in accordance with the Code. 
14. Prior Period Adjustments
When items of income and expenditure are material, their nature and amount is disclosed separately either on the face of
the CIES or in the notes to the Accounts, depending on how significant the items are to an understanding of the Council’s
financial performance. Prior period adjustments may arise as a result of a change in accounting policy or to correct a
material error.  Changes are made by adjusting the opening balances and comparative amounts for the prior period. 
15. Provisions
Provisions are made where an event has taken place that gives the Council a legal or constructive obligation that probably
requires settlement by a transfer of economic benefits or service potential and a reliable estimate can be made of the
amount of the obligation. 
Provisions are charged as an expense to the appropriate service line in the CIES in the year that the Council becomes
aware of the obligation and are measured at the best estimate at the Balance Sheet date of the expenditure required to
settle the obligation, taking into account relevant risks and uncertainties. 
When payments are eventually made, they are charged to the provision carried in the Balance Sheet.  Estimated
settlements are reviewed at the end of each financial year.  Where it becomes less than probable that a transfer of
economic benefits will be required (or a lower settlement than anticipated is made), the provision is reversed and credited
back to the relevant service. 
Page 59

Page 60

48
Moray Council Unaudited Annual Account 2022/23
Note 1 Accounting Policies (continued) 
16. Reserves
Reserves are created by appropriating amounts from the General Fund balance in the MIRS.  When expenditure to be
financed from a reserve is incurred, it is charged to the appropriate service within the CIES.  The reserve is then
appropriated back into the General Fund balance in the MIRS so that there is no net charge against Council tax for the
expenditure. 
17. VAT
VAT is included in the CIES only to the extent that it is irrecoverable. The net amount due to or from HM Revenue and
Customs in respect of VAT is included as part of debtors or creditors. 
Note 2 Prior Period Amendments 
Context 
In arriving at these amendments, it should be noted that this note to the accounts relates to the single entity values only.
Restatements were also made to the Common Good Accounts and the detail of these is discussed in Note 4. 
Any adjustments made are as a direct result of the materiality of their impact on the Accounts for 2021/22. 
Property, Plant & Equipment/Intangible Assets 
The 2022/23 opening balance for Property, Plant & Equipment and Intangible Assets has been adjusted upward by a total
of £17.070m. The adjustment relates to a number a number of non-current assets as follows: 
• A number of assets were not revalued as part of the 2021/22 year end processes but were determined to have
had a material change in value since their last valuation date. These assets were subject to a desktop valuation
exercise and the opening balances restated.
• During 2022/23 the Council moved to a new Asset Register System. As part of the transition to the new system
errors were identified in how indexation had been applied to assets in 2021/22 and the opening balances were
corrected. 
Overall Effect of the Prior Period Adjustment 
When working through the amended non-current asset values for the prior periods, there has been an impact across
several areas within the annual accounts. Therefore, individual summaries of the impacts have been recorded in the tables
below. The main areas which were impacted were as follows: 
• The value of assets recorded on the Balance Sheet;
• Levels of Unusable Reserves (Movement in Reserves Statement);
• Depreciation and Revaluation amounts recorded in the Comprehensive Income and Expenditure Statement
(CIES) and Balance Sheet. 
Page 60

Page 61

49
Moray Council Unaudited Annual Account 2022/23
Note 2 Prior Period Adjustments (continued) 
Balance Sheet
Opening
Balances as at
1st April 2022
Restated
Balances as at
1st April 2022
Restatement
£000 £000 £000
Property, Plant & Equipment 1,158,116 1,175,180 17,064
Heritage Assets 1,151 1,151 -
Investment Property 222 222 -
Intangible Assets 30 36 6
Long Term Debtors 484 484 -
Long Term Assets 1,160,003 1,177,073 17,070
Inventories 1,642 1,642 -
Short Term Debtors 17,017 17,017 -
Assets held for sale 877 877 -
Cash and Cash Equivalents 15,409 15,409 -
Current Assets 34,945 34,945 -
Short Term Borrowing (75,973) (75,973) -
Short Term Creditors (48,265) (48,265) -
Donated Inventories Account (649) (649) -
Current Liabilities (124,887) (124,887) -
Provisions (149) (149) -
Long Term Borrowing (160,784) (160,784) -
Other Long Term Liabilities (55,207) (55,207) -
Pensions Liability (54,558) (54,558) -
Liabilities in Associates - - -
Long Term Liabilities (270,698) (270,698) -
Net Assets 799,363 816,433 17,070
General Fund Balance 45,409 45,409 -
Housing Revenue Account 2,465 2,465 -
Capital Receipts Reserve 988 988 -
Capital Grants & Receipts Unapplied Account 6,029 6,029 -
Revenue Statutory Funds 4,152 4,152 -
Usable Reserves 59,043 59,043 -
Revaluation Reserve 406,094            417,278            11,184
Capital Adjustment Account 402,325            408,211            5,886
Financial Instruments Adjustment Account (5,716)               (5,716)               -
Employee Statutory Adjustment Account (7,825)               (7,825)               -
Pensions Reserve (54,558)             (54,558)             -
Unusable Reserves 740,320 757,390 17,070
Total Reserves 799,363 816,433 17,070
Page 61

Page 62

50
Moray Council Unaudited Annual Account 2022/23
Note 2 Prior Period Adjustments (continued) 
Comprehensive Income and Expenditure Statement (CIES) 
Expenditure Income Net Expenditure Income Net Restatement
£000 £000 £000 £000 £000 £000 £000
Education  91,406 (13,271) 78,135 90,131 (13,271) 76,860 (1,275)
Education Resources & Communities 29,595 (4,406) 25,189 29,337 (4,406) 24,931 (258)
Social Work 20,342 (1,885) 18,457 20,341 (1,885) 18,456 (1)
General Services Housing and Property Services 14,242 (9,006) 5,236 13,550 (9,006) 4,544 (692)
Environmental & Commercial Services 56,486 (14,792) 41,694 53,042 (14,792) 38,250 (3,444)
Economic Growth & Development 9,648 (4,543) 5,105 9,608 (4,543) 5,065 (40)
HR, ICT & Organisational Development 7,118 (400) 6,718 6,832 (400) 6,432 (286)
Governance, Strategy & Performance 20,175 (14,045) 6,130 20,175 (14,045) 6,130 -
Financial Services 3,332 (831) 2,501 3,340 (831) 2,509 8
Other 1,904 (142) 1,762 1,904 (142) 1,762 -
Health and Social Care 119,454 (66,160) 53,294 119,304 (66,160) 53,144 (150)
Housing Revenue Account 14,618 (21,229) (6,611) 14,870 (21,229) (6,359) 252
Cost Of Services 388,320 (150,710) 237,610 382,434 (150,710) 231,724 (5,886)
2021/22 Audited Accounts Restated 2021/22
Council Council
Page 62

Page 63

51
Moray Council Unaudited Annual Account 2022/23
Note 2 Prior Period Adjustments (continued) 
Comprehensive Income and Expenditure Statement (CIES) (continued) 
Expenditure Income Net Expenditure Income Net Restatement
£000 £000 £000 £000 £000 £000 £000
Cost Of Services Brought Forward 388,320 (150,710) 237,610 382,434 (150,710) 231,724 (5,886)
Other Operating Expenditure (Note 12) 8,707 8,707 -
-
Financing and Investment Income and Expenditure (Note 13) 13,157 13,157 -
-
Taxation and Non-Specific Grant Income (Note 14) (243,650) (243,650) -
-
Deficit on Provision of Services 15,824 9,938 (5,886)
(Surplus)/Deficit on revaluation of Property, Plant and
Equipment (Notes 15 & 23)
(124,386) (135,570) (11,184)
(Surplus)/Deficit on revaluation of available for sale financial
assets
- - -
Remeasurement of the net defined benefit liability (Note 28 &
42)
(13,274) (13,274) -
Other (Income)/Expenditure (137,660) (148,844) (11,184)
Total Comprehensive Net (Income)/Expenditure (121,836) (138,906) (17,070)
2021/22 Audited Accounts Restated 2021/22
Council Council
Page 63

Page 64

52
Moray Council Unaudited Annual Account 2022/23
Note 3 Accounting Standards That Have Been Issued but Have Not Yet Been Adopted 
The Code requires the Council to identify any accounting standards that have been issued but have yet to be adopted and
could have a material impact on the accounts. This applies to the adoption of the following new or amended standards
within the 2022/23 Code: 
• Definition of Accounting Estimates (Amendments to IAS 8);
• Disclosure of Accounting Policies (Amendments to IAS 1 and IFRS Practice Statement 2);
• Deferred Tax (Amendments to IAS 12);
• Updating a Reference to the Conceptual Framework (Amendments to IFRS 3). 
The Code requires implementation from 1 April 2023 and there is, therefore, no impact on the 2022/23 financial statements. 
The above amendments are not anticipated to have a material impact on the information provided in the financial
statements. 
Note 4 Nature of the Group and Group Members 
The Council has an interest in a number of Subsidiary and Associate entities. 
For the purposes of combination and incorporation within the Group Accounts, recognition has been made of the Council’s
controlling interest in six subsidiary entities and three associate entities. 
Subsidiaries 
The Entities which have been combined as subsidiaries are:
Name of Subsidiary
Principal
Place of
Business
% of ownership interst
held by the Group
% of ownership interest
held by the non-controlling
interests (NCI)
Banffshire Educational Trust Moray 50 50
Donald Manson Edinkille Trust Fund Moray 67 33
Donald Manson Forres Trust Fund Moray 67 33
Auchernack Trust Moray 80 20
Other Trust Funds Moray 100 -
The Council inherited its interests in the Trust Funds and Common Good Funds following reorganisation of local
government in 1996. It is considered that the combination was on an acquisition basis. However, as no financial
consideration was given for this interest, there is no goodwill involved in these instances.
The Council acts as joint trustee with other parties for four trust funds which have a combined net asset balance of £2.102m.
The Council acts as sole trustees for various other trust funds which have a net asset balance of £8.482m. 
The Council is responsible for the administration of Common Good Funds which were all the property of a Royal Burgh
not acquired under statutory powers or held under specific trusts. Council Members have responsibility for decisions on
the distribution of these funds. The Common Good Funds have a net asset balance of £23.279m. 
The individual accounts for these entities are shown separately on pages 107 to 120. 
Page 64

Page 65

53
Moray Council Unaudited Annual Account 2022/23
Note 4 Nature of the Group and Group Members (continued) 
Associates 
The Entities that have been combined as Associates are: 
Name of Associate
Principal
Place of
Business
Moray
Council's
Share of
Voting Control
Moray Council's
Share of
Requisition
Measurement
Method
Grampian Valuation Joint Board Moray 20% 17% Equity
Moray Leisure Limited Moray 33% n/a Equity
Moray Integration Joint Board Moray 50% 33% Equity 
Copies of Accounts for Associates are available at the following addresses: 
Name of Associate Address where Accounts are Available  
Grampian Valuation Joint Board Council Building, High Street, Elgin  IV30 1BX
Moray Leisure Limited Borough Briggs Road, Elgin, IV30 1AP
Moray Integration Joint Board Council Building, High Street, Elgin, IV30 1BX 
The tables below provide summarised financial information for those associates that are material to the Council. The
information disclosed reflects the amounts presented in the financial statements of the relevant associates and not the
reporting entity’s share of those amounts. 
Page 65

Page 66

54
Moray Council Unaudited Annual Account 2022/23
Note 4 Nature of the Group and Group Members (continued) 
Summarised balance sheet 
Restated Restated
2021/22 2022/23 2021/22 2022/23 2021/22 2022/23
£000 £000 £000 £000 £000 £000
Current assets
Cash and cash equivalents 1,380       1,205       215           186          
Other current assets 90             85             145           153           17,021     4,683      
Total current assets 1,470 1,290 360 339 17,021 4,683
Non-current assets 730           10,942     364           329           - -
Current liabilities (933)         (705)         (464)         (463)         - -
Non-current liabilities (503)         (420) (294) - -
Net assets/(liabilities) 764 11,527 (160) (89) 17,021 4,683
Reconciliation to carrying amounts:
Opening net assets/(liabilities) 998 764 352 (160) 6,342 17,021
Surplus/(deficit) for the period (234) 10,763     (512) 72 10,679 (12,338)
Closing net assets/(liabilities) 764 11,527 (160) (88) 17,021 4,683
Reporting entity's share (%) 17 17 43 33 50 50
Reporting entity's share 130 1,960 (69) (29) 8,511 2,342
Carrying amount 130 1,960 (69) (29) 8,511 2,342
Grampian Valuation
Joint Board
Moray Leisure
Limited
Moray Integration
Joint Board (Joint
Venture)
Page 66

Page 67

55
Moray Council Unaudited Annual Account 2022/23
Note 4 Nature of the Group and Group Members (continued) 
Summarised Statements of Comprehensive Income and Expenditure 
Restated Restated
2021/22 2022/23 2021/22 2022/23 2021/22 2022/23
£000 £000 £000 £000 £000 £000
Revenue (4,560) 4,894 (2,236) (3,321) (164,487) (156,443)
Interest Income (12) (27)
Depreciation and Amortisation 34 34 81 88 - -
Interest Expense - -
(Surplus)/deficit for the period 185 396 (512) 72 (10,679) 12,338
Other Comprehensive Income and
Expenditure 49 (11,159) - - - -
Total Comprehensive Income and
Expenditure 234 (10,763) (512) 72 (10,679) 12,338
Grampian
Valuation Joint
Moray Leisure
Limited
Moray Integration
Joint Board (Joint 
Inclusion of Associate entities has increased reserves and net assets in the group by £4.272m due mainly to the reserves
of Moray Integration Joint Board, as well as a smaller increase in reserves for Grampian Valuation Joint Board and a small
decrease for Moray Leisure Ltd. 
Other Entities in which the Council has an Interest 
During the year the Council had an interest in Grampian Venture Capital Fund Limited and the Highlands and Islands
Transport Partnership (HITRANS). These companies have been excluded from the Group Accounts on the basis that the
Council has no exposure to commercial risk from the companies and the Council has not passed on control of any of its
assets to the companies. The financial transactions of the companies would also have no material effect on the Council’s
accounts.   
Grampian Venture Capital Fund HITRANS
Nature Economic development Local Government
Purpose
Provide equity funding for small
and medium sized enterprises
To prepare transport strategies
for the region
Size Small business Small business
Activities Provider equity funding Transport strategy preparation
Financed 455,000 ordinary shares issued
Contributions from 5
Constituent Authorities
(Highland, Moray and 3 others)
Moray Council's share of voting control 20.44% 25%
Page 67

Page 68

56
Moray Council Unaudited Annual Account 2022/23
Note 4 Nature of the Group and Group Members (continued) 
Carrying amounts of the entities: 
2021/22 2022/23 2021/22 2022/23
£000 £000 £000 £000
carrying amount of receivables 41 44 473 836
carrying amount of liabilities - - 750 796
Maximum exposure to loss 41 44 750 796
Grampian Venture
Capital Fund HITRANS
Note 5 Critical Judgements in Applying Accounting Policies 
In applying the accounting policies set out in these financial statements, the Council and its associates have had to make
certain judgements about complex transactions or those involving uncertainty about future events. 
The critical judgements made in the Statement of Accounts are:
• The Council has entered into a Public Private Partnership (PPP) for the construction, maintenance and operation
of two schools in Keith and Elgin (Keith Primary School and Elgin Academy) which have a carrying value of
£11.474m and £48.388m respectively. The Council has also entered into a Design, Build, Finance and Maintain
(DBFM) contract for the construction, maintenance and operation of Elgin High School, which has a carrying
value of £36.287m. The Council has considered the tests under IFRIC 12 and concluded there are service
concessions.
• Assets held at current value are revalued on a five year rolling basis as set out in the accounting policy for
Property, Plant and Equipment. A proportion of assets are subject to a desktop valuation on the basis of local
market indices as advised by the Council’s Estates Manager. For assets not subject to a formal or desktop
valuation in year, the Council’s Estates Manager, who is a qualified Royal Institution of Chartered Surveyors
(RICS) Valuer, has asserted that the carrying amount does not differ materially from that which would be
determined using current value, and the Chief Financial Officer is content with this assertion.
• During 2022/23 the Council was responsible for the payment of business and other grants on behalf of the Scottish
Government. In preparing the Annual Accounts it was considered whether these amounts met the definition of
being a principal or an agency transaction. Relevant guidance issued by CIPFA LASAAC was considered and
where amounts were deemed to be agency transactions, the amounts are not recognised in the Council’s income
or expenditure. 
Page 68

Page 69

57
Moray Council Unaudited Annual Account 2022/23 
Note 6 Assumptions Made About the Future and Other Major Sources of Estimation
Uncertainty 
The Annual Accounts contains estimated figures that are based on assumptions made by the Council about the future or
that are otherwise uncertain. Estimates are made taking into account historical experience, current trends and other
relevant factors. However, because balances cannot be determined with certainty, actual results could be materially
different from the assumptions and estimates. 
The items in the Council's Balance Sheet at 31 March 2023 for which there is significant risk of material adjustment in the
forthcoming financial year are as follows: 
Item Uncertainties Effect if Actual Results Differ from
Assumptions   
Property, Plant and
Equipment
Assets are depreciated over useful lives
that are dependent on assumptions about
the level of repairs and maintenance that
will be incurred in relation to individual
buildings. The current economic climate
makes it uncertain that the Council will be
able to sustain its current spending on
repairs and maintenance, bringing into
doubt the useful lives assigned to assets. 
If the useful life of assets is reduced,
depreciation increases and the carrying
amount of the asset falls. It is estimated that
the annual depreciation charge for buildings
would increase by £1.756m for every year
that useful lives had to be reduced. 
Pension Liability 
Pension Assets 
Estimation of the net liability to pay
pensions depends on a number of
complex judgements relating to the
discount rate used, the rate at which
salaries are projected to increase,
changes in retirement ages, mortality
rates and expected returns on pension
fund assets. 
Estimation of the expected return on
Pension Assets. 
The effects on the net pensions liability of
changes in individual assumptions can be
measured and are detailed in Note 42. 
Part of the pension fund is invested in Level
3 Investments. The nature of these
investments means there is a greater risk
and more uncertainty over their valuation.
There may be an impact on net pension
scheme liabilities depending on the stock
market. 
Note 7 Events after the Reporting Period 
The unaudited Annual Accounts were issued on 28 June 2023 by Lorraine Paisey, Chief Financial Officer. Events taking
place after this date are not reflected in the financial statements or notes. Where events taking place before this date
provided information about conditions existing at 31 March 2023, the figures in the financial statements and notes have
been adjusted in all material respects to reflect the impact of this information. 
Page 69

Page 70

58
Moray Council Unaudited Annual Account 2022/23
Note 8 Expenditure and Funding Analysis
Net
expenditure
chargeable
to the
General
Fund and
HRA
Balances
Adjustments
between the
Funding and
the
Accounting
Basis
Adjustments
to Usable
Reserves
Permitted by
Accounting
Standards
Net expenditure
in the
Comprehensive
Income and
Expenditure
Statement
Net
expenditure
chargeable
to the
General Fund
and HRA
Balances
Adjustments
between the
Funding and
the
Accounting
Basis
Adjustments
to Usable
Reserves
Permitted by
Accounting
Standards
Net
expenditure in
the
Comprehensive
Income and
Expenditure
Statement
£000 £000 £000 £000 £000 £000 £000 £000
68,247 8,613 - 76,860 Education  77,119 9,837 5,262 92,218
20,824 3,670 437 24,931 Education Resources & Communities 23,714 2,133 812 26,659
17,300 1,154 2 18,456 Social Work 15,507 1,008 875 17,390
2,719 1,281 544 4,544
General Services Housing and Property
Services 4,987 1,714 555 7,256
25,444 12,056 750 38,250 Environmental & Commercial Services 28,295 13,522 2 41,819
4,285 780 - 5,065 Economic Growth & Development 4,254 882 - 5,136
5,329 1,103 - 6,432 HR, ICT & Organisational Development 5,830 1,237 - 7,067
5,507 623 - 6,130 Governance, Strategy & Performance 6,435 638 - 7,073
2,126 383 - 2,509 Financial Services 2,214 347 - 2,561
2,610 (848) - 1,762 Other 2,502 (882) - 1,620
49,601 3,477 66 53,144 Health and Social Care 58,571 3,367 129 62,067
(9,198) (1,285) 4,124 (6,359) Housing Revenue Account (7,801) 1,791 2,844 (3,166)
194,794 31,007 5,923 231,724 Cost of Services 221,627 35,594 10,479 267,700
(199,360) (22,426) - (221,786) Other Income and Expenditure (222,024) (26,586) - (248,304)
(4,566) 8,581 5,923 9,938 (Suplus)/Deficit (397) 9,008 10,479 19,396
(44,273) Opening General Fund and HRA Balance (47,873)
(4,566)
(Surplus) Deficit on General Fund and
HRA Balance in year (396)
966 Transfers from Reserves 153
(47,873)
Closing General Fund and HRA Balance
at 31 March* (48,116)
2021/22 Restated 2022/23
*A split of this balance between the General Fund and the HRA is shown on the Movement in Reserves Statement.
Page 70

Page 71

59
Moray Council Unaudited Annual Account 2022/23
Note 8 Expenditure and Funding Analysis (continued) 
The Expenditure and Funding Analysis shows how annual expenditure is used and funded from resources (government
grants, rents, council tax and business rates) by the Council in comparison with those resources consumed or earned by
the Council in accordance with generally accepted accounting practices. It also shows how this expenditure is allocated
for decision making purposes between the Council's services as reported during the year. Income and Expenditure
accounted for under generally accepted accounting practices is presented more fully in the Comprehensive Income and
Expenditure Statement. 
Adjustments between the Funding and the Accounting Basis 2021/22 Restated 
Adjustments from General Fund to
arrive at the Comprehensive Income
and Expenditure Statement amounts
Adjustments
for Capital
Purposes
Note a
Net Change
for the
Pensions
Adjustments
Note b
Other
Differences
Note c
Elimination
of Internal
Recharges
Note d
Total
Adjustments
£000 £000 £000 £000 £000
Education  6,478 2,055 325 (245) 8,613
Education Resources & Communities 1,318 1,972 482 (102) 3,670
Social Work 79 1,353 38 (316) 1,154
General Services Housing and Property
Services 191 1,300 (41) (169) 1,281
Environmental & Commercial Services 8,354 2,933 (7) 776 12,056
Economic Growth & Development 71 763 (27) (27) 780
HR, ICT & Organisational Development 473 651 (18) (3) 1,103
Governance, Strategy & Performance - 667 (42) (2) 623
Financial Services 8 371 4 - 383
Other 28 (869) (5) (2) (848)
Health and Social Care (18) 3,359 46 90 3,477
Housing Revenue Account (1,667) 386 (4) - (1,285)
Net Cost of Services 15,315 14,941 751 - 31,007
Other Income and Expenditure (23,044) 927 (309) (22,426)
Total Adjustments (7,729) 15,868 442 - 8,581
Page 71

Page 72

60
Moray Council Unaudited Annual Account 2022/23
Note 8 Expenditure and Funding Analysis (continued) 
Adjustments between the Funding and the Accounting Basis 2022/23 
2022/23
Adjustments from General Fund to arrive
at the Comprehensive Income and
Expenditure Statement amounts
Adjustments
for Capital
Purposes
Note a
Net Change
for the
Pensions
Adjustments
Note b
Other
Differences
Note c
Elimination
of Internal
Recharges
Note d
Total
Adjustments
£000 £000 £000 £000 £000
Education  7,162 2,071 815 (211) 9,837
Education Resources & Communities 443 2,168 (382) (95) 2,134
Social Work 20 1,277 (69) (219) 1,009
General Services Housing and Property
Services 577 1,315 59 (237) 1,714
Environmental & Commercial Services 9,445 2,871 317 888 13,521
Economic Growth & Development 135 773 3 (28) 883
HR, ICT & Organisational Development 612 647 (14) (8) 1,237
Governance, Strategy & Performance - 662 3 (27) 638
Financial Services 8 365 (27) - 346
Other - (882) - (1) (883)
Health and Social Care 140 3,372 (83) (62) 3,367
Housing Revenue Account 1,368 408 15 - 1,791
Net Cost of Services 19,910 15,047 637 - 35,594
Other Income and Expenditure (27,560) 1,285 (311) (26,586)
Total Adjustments (7,650) 16,332 326 - 9,008 
a) Adjustments for Capital Purposes 
This column adds back depreciation and impairment and revaluation gains and losses in the services line. 
Adjustments to Other Income and Expenditure reflect: 
Other Operating Expenditure - capital disposals with a transfer of income on disposal of assets and the amounts written
off for those assets and the movement on revaluation of held for sale financial assets. 
Financing and Investment Income and Expenditure - the removal of statutory charges for capital financing, i.e. loans
pool principal charges are deducted from Other Income and Expenditure. These amounts are not chargeable under
generally accepted accounting practice. 
Taxation and Non-Specific Grant Income - capital grants adjustments whereby income is credited with capital grants
receivable in the year without conditions or for which conditions were satisfied in the year. 
Page 72

Page 73

61
Moray Council Unaudited Annual Account 2022/23
Note 8 Expenditure and Funding Analysis (continued) 
b) Net Change for the Pensions Adjustments 
This column reflects the removal of pension contributions and the addition of IAS 19 Employee Benefits pension related
income and expenditure. 
For Services this reflects the removal of the employer pension contributions made by the Council as allowed by statute
and the replacement with current service costs and past service costs. 
For Financing and Investment Income and Expenditure the net interest on the defined benefit liability is charged to the
Comprehensive Income and Expenditure Statement. 
c) Other Differences 
This column adjusts for differences between the amounts debited/credited to the Comprehensive Income and Expenditure
Statement and amounts payable/receivable recognised under statute. 
For Services this reconciles the impact of accruals for accumulating compensated absences, e.g. holiday pay as required
by IAS 19 Employee Benefits, to the salaries actually payable in the financial year in accordance with statute. 
For Financing and Investment Income and Expenditure the entry recognises adjustments to the General Fund for the
timing differences for premiums and discounts. 
d) Elimination of Internal Recharges 
The Code requirements prohibit the inclusion of income and expenditure on a trading basis between segments in the
Comprehensive Income and Expenditure Statement (CIES). As a consequence, internal transactions are not to be included
in the CIES.
Page 73

Page 74

62
Moray Council Unaudited Annual Account 2022/23
Note 9 Expenditure and Income Analysed by Segment and Nature 
The authority's expenditure and income is analysed as follows. Segments have been identified based on the organisational structure used by the Council for internal management
reporting. 
Income and Expenditure 2021/22 Restated 
Education
Education
Resources &
Communities
Social Work
General Services
Housing &
Property Services
Environmental &
Commercial
Services
Economic Growth
& Development
HR, ICT &
Organisational
Development
Governance,
Startegy &
Performance
Financial Services
Other Services
Health & Social
Care
Housing Revenue
Account
Costs not
included in a
Service
Total
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Employee expenses 66,773   22,093  10,060 10,067  22,821   5,630   4,869    4,801     2,713 803     25,451    3,040     927           180,048  
Other service expenses 16,880   5,489    10,200 2,748    21,117   2,960   1,490    15,374   619     1,073 93,805    9,373     187           181,315  
Depreciation, amortisation
and impairment 6,478     1,755    81         735       9,104     1,018   473       -              8         28       48            2,457     -                22,185    
Interest Payments -              -             -             -             -              -            -             -              -          -          -               -              12,282     12,282    
Loss on Disposal of Non
Current Assets -              -             -             -             -              -            -             -              -          -          -               -              8,707       8,707      
Total Expenditure 90,131   29,337  20,341 13,550  53,042   9,608   6,832    20,175   3,340 1,904 119,304 14,870   22,103     404,537  
Fees, charges & other
service income (359)       (1,712)   (144)      (7,846)   (14,575) (2,187) (390)      (13,170) (809)   (142)   (66,118)  (21,229) -                (128,681)
Interest and investment
income -              -             -             -             -              -            -             -              -          -          -               -              (240)         (240)        
Income from council tax -              -             -             -             -              -            -             -              -          -          -               -              (45,979)    (45,979)   
Government grants and
contributions (12,912) (2,694)   (1,741)  (1,160)   (217)       (2,356) (10)        (875)       (22)      -          (42)          (197,670) (219,699)
Total Income (13,271) (4,406)   (1,885)  (9,006)   (14,792) (4,543) (400)      (14,045) (831)   (142)   (66,160)  (21,229) (243,889) (394,599)
Net Expenditure 76,860   24,931  18,456 4,544    38,250   5,065   6,432    6,130     2,509 1,762 53,144    (6,359)   
(Surplus) or deficit on the provision of sevices 9,938       
Page 74

Page 75

63
Moray Council Unaudited Annual Account 2022/23
Note 9 Expenditure and Income Analysed by Segment and Nature (continued) 
Income and Expenditure 2022/23 
Income and Expenditure 2022/23
Education
Education
Resources &
Communities
Social Work
General Services
Housing &
Property Services
Environmental &
Commercial
Services
Economic Growth
& Development
HR, ICT &
Organisational
Development
Governance,
Startegy &
Performance
Financial Services
Other Services
Health & Social
Care
Housing Revenue
Account
Costs not
included in a
Service
Total
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Employee expenses 72,530    25,250  10,324 11,148  24,437   6,148    5,195    5,217     2,788 998     27,730    3,447       1,285       196,497  
Other service expenses 19,595    5,261    10,438 4,145    24,845   4,073    1,643    15,089   653     827     107,750 10,944     317           205,580  
Depreciation,
amortisation and
impairment 12,424    1,255    20         1,452    10,000   137       612       -              8         -          269         4,213       -                30,390    
Interest Payments -               -             -             -             -              -             -             -              -          -          -               -                12,377     12,377    
Loss on Disposal of
Non Current Assets -               -             -             -             -              -             -             -              -          -          -               -                492           492          
Total Expenditure 104,549 31,766  20,782 16,745  59,282   10,358 7,450    20,306   3,449 1,825 135,749 18,604     14,471     445,336  
Fees, charges & other
service income (508)        (2,228)   (132)      (8,462)   (17,256) (2,724)  (383)      (12,488) (888)   (94)      (73,002)  (21,770)    -                (139,935)
Interest and investment
income -               -             -             -             -              -             -             -              -          -          -               -                (1,123)      (1,123)     
Income from council tax -               -             -             -             -              -             -             -              -          -          -               -                (48,375)    (48,375)   
Government grants and
contributions (11,823)  (2,879)   (3,260)  (1,027)   (207)       (2,498)  -             (745)       -          (111)   (680)        -                (213,277) (236,507)
Total Income (12,331)  (5,107)   (3,392)  (9,489)   (17,463) (5,222)  (383)      (13,233) (888)   (205)   (73,682)  (21,770)    (262,775) (425,940)
Net Expenditure 92,218    26,659  17,390 7,256    41,819   5,136    7,067    7,073     2,561 1,620 62,067    (3,166)     
(Surplus) or deficit on the provision of sevices 19,396     
Page 75

Page 76

64
Moray Council Unaudited Annual Account 2022/23
Note 10 Adjustments between Accounting Basis and Funding Basis under Regulations 
This note details the adjustments that are made to the Total Comprehensive Income and Expenditure recognised by the
Council in the year in accordance with proper accounting practice to arrive at the resources that are specified by statutory
provisions as being available to the Council to meet future capital and revenue expenditure. 
2021/22 Restated
General Fund
HRA
Revenue Statutory
Funds
Capital Receipts
Reserve
Capital Grants &
Receipts
Unapplied Account
£000 £000 £000 £000 £000
Adjustments to the Revenue Resources
Amounts by which income and expenditure included in
the Comprehensive Income and Expenditure
Statement are different from revenue for the year
calculated in accordance with statutory requirements,
Pensions costs (transferred from the Pensions
Reserve) 15,462 407
Financial Instruments (transferred to the Financial
Instruments Adjustment Account) (213) (96)
Holiday pay (transferred to the Employee Statutory
Adjustment Account) 755 (4)
Reversal of entries included in the Surplus or Deficit on
the Provision of Services in relation to capital
expenditure (these items are charged to the Capital
Adjustment Account) 13,867 (2,832) - - -
Total Adjustment to Revenue Resources 29,871 (2,525) - - -
Adjustments between Revenue and Capital Resources
Transfer of non-current asset sale proceeds from
revenue to the Capital Receipts Reserve - - - - -
Capital receipts transferred to the Capital Grants and
Receipts Unapplied Account (1,281) 1,281
Statutory provision for the repayment of debt (transfer to th (10,035) (1,377)
Capital expenditure financed from revenue balances
(transfer to the Capital Adjustment Account) (550) (5,522)
Total Adjustments between Revenue and (11,866) (6,899) - - 1,281
Capital Resources
Adjustments to Capital Resources
Use of the Capital Receipts Reserve to finance new capita - - - - -
Total Adjustments to Capital Resources - - - - -
Total Adjustments 18,005 (9,424) - - 1,281
Usable Reserves
Page 76

Page 77

65
Moray Council Unaudited Annual Account 2022/23
Note 10 Adjustments between Accounting Basis and Funding Basis under Regulations
(continued) 
2022/23
General Fund
HRA
Revenue Statutory
Funds
Capital Receipts
Reserve
Capital Grants &
Receipts
Unapplied Account
£000 £000 £000 £000 £000
Adjustments to the Revenue Resources
Amounts by which income and expenditure included in
the Comprehensive Income and Expenditure Statement
are different from revenue for the year calculated in
accordance with statutory requirements,
Pensions costs (transferred from the Pensions
Reserve) 15,894 438 - - -
Financial Instruments (transferred to the Financial
Instruments Adjustment Account) (215) (96) - - -
Holiday pay (transferred to the Employee Statutory
Adjustment Account) 622 15 - - -
Reversal of entries included in the Surplus or Deficit on
the Provision of Services in relation to capital
expenditure (these items are charged to the Capital
Adjustment Account) 14,571 (4,534)
Total Adjustment to Revenue Resources 30,872 (4,177) - - -
Adjustments between Revenue and Capital Resources
Transfer of non-current asset sale proceeds from
revenue to the Capital Receipts Reserve
Capital receipts transferred to the Capital Grants and
Receipts Unapplied Account (1,014) - - - -
Statutory provision for the repayment of debt (transfer to
the Capital Adjustment Account) (2,402) (1,708)
Capital expenditure financed from revenue balances
(transfer to the Capital Adjustment Account) - (2,085) - - -
Total Adjustments between Revenue and (3,416) (3,793) - - -
Capital Resources
Adjustments to Capital Resources
Use of the Capital Receipts Reserve to finance new capita - - - -
Total Adjustments to Capital Resources - - - - -
Total Adjustments 27,456 (7,970) - - -
Usable Reserves
Page 77

Page 78

66
Moray Council Unaudited Annual Account 2022/23
Note 11 Transfers to/from Revenue Statutory Funds and Earmarked portions of the General
Fund 
This note sets out the amounts set aside from the General Fund and HRA balances in Revenue Statutory Funds to provide
financing for future expenditure plans and the amounts posted back from Revenue Statutory Funds to meet General Fund
and HRA expenditure in 2022/23. 
Repairs
and
Renewals
Fund
Insurance
Fund Total
£000 £000 £000
Balance at 31 March 2021 2,728 1,406 4,134
Transfers in 2021/22 12 6 18
Balance at 31 March 2022 2,740 1,412 4,152
Transfers in 2022/23 57 30 87
Balance at 31 March 2023 2,797 1,442 4,239 
Earmarked portions of the General Fund 
Portions of the General Fund are earmarked for specific purposes as described below. Underspends or overspends against
budget for these activities are transferred in or out of the earmarked funds at the year end. 
General Services
Devolved School
Management
Early Years
Childcare
Expansion
Pupil Equity
Funding
Transformation
Council Priorities
Covid-19 Funding
Other Funds
Total
£000 £000 £000 £000 £000 £000 £000 £000 £000
Balance at 31 March 2021 15,349   1,343 573       802     3,664 2,881 16,421 839    41,872    
Transfers Out 2021/22 (10,349) (55)      (573)      -          -          -          -             (428)  (11,405)   
Transfers In 2021/22 -              -          -             244     1,816 7,000 5,838    44      14,942    
Balance at 31 March 2022 5,000     1,288 -             1,046 5,480 9,881 22,259 455    45,409    
Transfers Out 2022/23 -              (436)   -             (289)   -          -          -             (179)  (904)        
Transfers In 2022/23 -              -          -             -          -          -          638       555    1,193      
Balance at 31 March 2023 5,000     852     -             757     5,480 9,881 22,897 831    45,698     
Devolved School Management (DSM)
This ring fenced reserve is a consolidation of the balances held by schools that are retained for the specific purpose of
investing in services delivered at each individual school. The DSM scheme enables a policy of retaining resources at each
school rather than returning the balances to a corporate fund. This policy aims to encourage schools to plan financially
over the medium term. 
Expansion of Funded early Learning and Childcare from 600 to 1140 hours
This ring fenced fund was the unspent balance of grant received from the Scottish Government for the expansion of Early
Learning and Childcare from 600 hours to 1,140 hours, which was full expended in 2021/22. 
Pupil Equity Funding
This ring fenced fund is the unspent balance of grant received the Scottish Government to provide targeted support for
children and young people affected by poverty.  The grant is paid on a financial year basis but spent over the academic
year. 
Page 78

Page 79

67
Moray Council Unaudited Annual Account 2022/23
Note 11 Transfers to/from Revenue Statutory Funds and Earmarked portions of the General 
Fund (continued) 
Transformation
The purpose of this fund is to set aside funding to initiate and advance the transformation of services and Improvement
and Modernisation Programme projects. 
Council Priorities
The purpose of this fund is to meet one-off expenditure which assists in achieving financial stability, as well as other
measures facilitating the achievement of Council priorities. 
Covid-19
The Scottish Government announced significant additional funding for expenditure related to the Covid-19 pandemic when
the Local Government Settlement was approved – some of these are related to specific areas such as Education, others
(mainly from Barnett consequentials) are not linked to particular issues. The unspent portions of this funding have been
carried forward in an ear-marked reserve and will be released as appropriate, with any associated spending plans approved
by members. 
Other Funds
These funds are grants and contributions unspent at the reporting year end which have restrictions on their use. The
largest individual component of these funds is for Employability and other large balances relate to amounts set aside for
insurance claims beneath the Council’s excess and to the Scottish Welfare Fund, which was set up in 2016/17 to be used
to provide individuals with assistance for short term need and community care. Other funds held include unspent monies
to be used to upgrade/maintain Sanquhar Loch in Forres, amounts to cover core path maintenance and upgrading within
and outside the boundary of Dorenell Windfarm, Nursery snack funds and funding approved to be used to alleviate the
cost of living crisis. 
Note 12 Other Operating Expenditure 
2021/22 2022/23
£000 £000
Losses on disposal of non-current assets 8,707       492          
8,707       492           
Note 13 Financing and Investment Income and Expenditure 
2021/22 2022/23
£000 £000
Interest payable and similar charges 12,282     12,377    
Net interest on the net defined benefit liability 928           1,285      
Interest receivable and similar income (236)         (1,119)     
Income and expenditure in relation to investment properties (4)              (4)             
Expected credit losses on financial assets 187           317          
13,157     12,856    
Note 14 Taxation and Non-Specific Grant Income 
2021/22 2022/23
£000 £000
Council tax income (45,979)    (48,375)   
Non domestic rates (41,260)    (54,575)   
Non-ring fenced government grants (142,144) (136,845)
Capital grants and contributions (14,267)    (21,857)   
(243,650) (261,652) 
Page 79

Page 80

68
Moray Council Unaudited Annual Account 2022/23
Note 15 Property, Plant and Equipment 
Assets that have physical substance and are held for use in the supply of services, for rental to others or for administrative
purposes and that are expected to be used during more than one financial year are classified as Property, Plant and
Equipment. 
Recognition
All expenditure on the acquisition, creation, enhancement or replacement of a part of an asset is capitalised providing the
asset yields benefit for more than one year to the Council and the services it provides and the cost can be reliably
measured.  Where a component is replaced or restored, the carrying amount of the old component is derecognised and
the new component reflected in the carrying amount. 
Measurement
Assets are initially measured at cost, comprising:
• The purchase price, and
• Any costs attributable to bringing that asset to the location and condition necessary for it to be capable of operating
in the manner intended by management. 
Depreciation
Depreciation is provided for on all Property, Plant and Equipment assets. An exception is made for assets without a
determinable useful life (i.e. land and certain community assets) and assets that are not yet available for use (i.e. assets
under construction). 
Depreciation is calculated using the straight-line method. In the year of acquisition, a full year's depreciation is provided
for on all assets except for vehicles, where the calculation is pro-rata based on the month of acquisition.  In the year of
disposal, no depreciation is charged. The following useful lives and depreciation rates have been used in the calculation
of depreciation:- 
Council Dwellings - up to 50 years
Other Land and Buildings - Buildings up to 65 years, land is not depreciated
Vehicles, Plant, Furniture and Equipment - 3 to 12 years
Infrastructure - up to 40 years
Community Assets - up to 40 years
Surplus Assets - Buildings up to 60 years, land is not depreciated 
Where a material item of Property, Plant and Equipment asset has major components whose cost is significant in relation
to the total cost of the item, the components are depreciated separately.
Page 80

Page 81

69
Moray Council Unaudited Annual Account 2022/23
Note 15 Property, Plant and Equipment (continued) 
Comparative Movements in 2021/22 Restated
Council
Dwellings
Other Land and
Buildings
Vehicles, Plant,
Furniture &
Equipment
Community
Assets
Surplus Assets
Assets Under
Construction
Total Property,
Plant and
Equipment
£000 £000 £000 £000 £000 £000 £000
Cost or valuation
At 1 April 2021 349,770 423,002 51,691     711    2,652 66,128     893,954  
Additions 6,856      5,538      3,340       163    -          16,386     32,283    
Revaluation increases/
(decreases) recognised in the
Revaluation Reserve 25,740    45,904    -                -         242     -                71,886    
Revaluation (decreases)
recognised in the Surplus on the
Provision of Services 3,459      (1,856)     -                -         115     (1,165)      553          
Derecognition – disposals -               -               (361)         -         -          -                (361)        
Derecognition – other -               (8,796)     -                -         -          -                (8,796)     
Assets reclassified (to)/ from Held
for Sale -               (1,571)     -                -         (160)   -                (1,731)     
Other movements in cost or
valuation 5,616      48,169    265           -         (22)      (54,052)    (24)           
At 31 March 2022 391,441 510,390 54,935     874    2,827 27,297     987,764  
Accumulated Depreciation and
Impairment
At 1 April 2021 8,279      57,490    34,424     345    124     -                100,662  
Depreciation charge 8,664      11,380    2,468       13      28       -                22,553    
Depreciation written out to the
Revaluation Reserve (13,291)  (51,018)  -                -         (94)      -                (64,403)   
Depreciation written out to the
Surplus on the Provision of
Services (2,917)     (3,287)     -                -         -          -                (6,204)     
Derecognition – disposals -               -               (305)         -         -          -                (305)        
Derecognition – other -               (1,539)     -                -         -          -                (1,539)     
Assets reclassified (to)/ from Held
for Sale -               (153)        -                -         (6)        -                (159)        
Other movements in depreciation
and impairment -               -               -                -         28       -                28             
At 31 March 2022 735         12,873    36,587     358    80       -                50,633     
Page 81

Page 82

70
Moray Council Unaudited Annual Account 2022/23
Note 15 Property, Plant and Equipment (continued) 
Movement in 2022/23
Council
Dwellings
Other Land and
Buildings
Vehicles, Plant,
Furniture &
Equipment
Community
Assets
Surplus Assets
Assets Under
Construction
Total Property,
Plant and
Equipment
£000 £000 £000 £000 £000 £000 £000
Cost or valuation
At 1 April 2022 391,441   510,583   54,935     874           3,045        27,297     988,175    
Additions 8,497        4,464        4,945        184           -                 14,199     32,289       
(decreases) recognised in the
Revaluation Reserve 30,997     30,121     -                 -                 (719)          -                 60,399       
recognised in the Surplus on
the Provision of Services (3,715)      -                 -                 -                 -                 -                 (3,715)        
Derecognition – disposals -                 (433)          (1,790)      -                 -                 -                 (2,223)        
Derecognition – other -                 -                 -                 -                 -                 (266)          (266)           
Assets reclassified (to)/ from
Held for Sale -                 (397)          -                 -                 (101)          -                 (498)            Other movements in cost or
valuation -                 394           -                 -                 (91)            (456)          (153)           
At 31 March 2023 427,220   544,732   58,090     1,058        2,134        40,774     1,074,008 
Accumulated Depreciation and
Impairment
At 1 April 2022 734           12,873     36,587     358           80             -                 50,632       
Depreciation charge 8,857        16,144     3,087        17             41             28,146       
Depreciation written out to the
Revaluation Reserve -                 -                  
Depreciation written out to the
Surplus on the Provision of
Services -                 -                  
Derecognition – disposals (1,629)      (1,629)        
Derecognition – other -                  
Assets reclassified (to)/ from
Held for Sale -                  
Other movements in
depreciation and impairment -                  
At 31 March 2023 9,591        29,017     38,045     375           121           -                 77,149       
Net Book Value
at 31 March 2022 390,706   497,517   18,348     516           2,747        27,297     937,131    
at 31 March 2023 417,629   515,715   20,045     683           2,013        40,774     996,859     
Page 82

Page 83

71
Moray Council Unaudited Annual Account 2022/23
Note 15 Property, Plant and Equipment (continued) 
The Scottish Government issued Finance Circular 9/2022 and the Council are invoking both statutory overrides permitted
by this guidance and removed the Gross Book Value and Accumulated Depreciation amounts for Infrastructure Assets.
The Net Book Value of these assets as at 31 March 2023 is £241m (2021/22 £238m), and is part of the Property, Plant
and Equipment figure in the Balance Sheet. 
Capital Commitments
At 31 March 2023, the Council has entered into a number of contracts for the construction or enhancement of Property,
Plant and Equipment in 2022/23 and future years budgeted to cost £5.304m (2021/22 £6.874m). The major contract is: 
£000
NESS Energy from Waste 5,304
5,304 
Revaluations
The Council carries out a rolling programme that ensures that all Property, Plant and Equipment required to be measured
at current or fair value is revalued at least every five years, with an indexation exercise carried out in the intervening years.
All valuations are carried out internally by the Council's Asset Manager (Commercial Property) in accordance with the
methodologies and bases for estimation set out in the professional standards of the Royal Institution of Chartered
Surveyors (RICS). A proportion of assets are subject to a desktop valuation on the basis of local market related indices at
31 March 2023. Such valuations were applied following consultation with the Council’s Asset Manager (Commercial
Property). 
Assets are carried in the Balance Sheet using the following measurement bases:
• Infrastructure, community assets and assets under construction - depreciated historical cost;
• Council dwellings - current value, determined using the basis of existing use value for social housing (EUV-SH);
• School buildings - current value, but because of their specialised nature are measured at depreciated replacement
cost (DRC) which is used as an estimate of current value;
• Surplus assets - current value as estimated as highest and best use from an open market perspective (fair value);
• All other assets - current value, determined as the amount that would be paid for the asset in its existing use
(existing use value) except for the Headquarters Campus buildings which are too large to be marketed as office
accommodation and are measured at depreciated replacement cost as an estimate of current value. 
Council
Dwellings
Other Land and
Buildings
Vehicles, Plant,
Furniture &
Equipment
Community
Assets
Surplus Assets
Assets Under
Construction
Total Property,
Plant and
Equipment
£000 £000 £000 £000 £000 £000 £000
Carried at historical cost - - 58,090 1,058 - 40,774 99,922      
Valued at current value as at:
31 March 2023 38,782    51,609    -             -          (1,006) -             89,385      
31 March 2022 47,728    123,808 -             -          41        -             171,577    
01 April 2020 333,520 42,120    -             -          (194)     -             375,446    
01 April 2019 8,116      36,378    -             -          1,282   -             45,776      
01 April 2018 3,961      268,480 -             -          1,660   -             274,101    
Total cost or valuation 432,107 522,395 58,090  1,058 1,783   40,774 1,056,207 
Page 83

Page 84

72
Moray Council Unaudited Annual Account 2022/23
Note 16 Heritage Assets 
The Council holds and conserves heritage assets for future generations in support of the primary objective of increasing
the knowledge, understanding and appreciation of the history of the area of Moray. 
The Council's policy (including its Common Good and Trusts) for the acquisition, presentation, management and disposal
of museum and art collections is contained in the Museum's Service "Acquisition and Disposal Policy" and for the Council's
archives within the Local Heritage Service Collection Policy, both of which are available on the Council's website. 
The movement in Heritage Assets during 2022/23 is as follows: 
Cultural
Modern
Statues
Museums
Collections
Total
Heritage
Assets
£000 £000 £000 £000
Valuation at 1 April 2021 126           105           920               1,151      
Additions -                -                -                    -               
Transfers/Reclassifications -                -                -                    -               
At 31 March 2022 126           105           920               1,151      
Valuation at 1 April 2022 126           105           920               1,151      
Additions -                -                -                    -               
Transfers/Reclassifications -                -                -                    -               
At 31 March 2023 126           105           920               1,151       
The amount included above for the museum’s collections is based on insurance valuations. Other Heritage Assets are
valued at historic cost. 
The following table shows assets that may be regarded as Heritage Assets but which have not been included in the
Balance Sheet as the Council considers that obtaining valuations would involve disproportionate cost and that reliable cost
or valuation information cannot be obtained for these items. This is because of the diverse nature of assets held, the
number of assets held and the lack of comparable market values. The Code therefore permits such assets to be excluded
from the Balance Sheet. 
Assets excluded from Heritage Assets
Estimated
number of
assets
31 March 2023
Archive Material circa 1,000,000        
Monuments and Fountains 11
War Memorials 46 
Note 17 Investment Property 
Investment Property is property held solely to earn rentals and/or for capital appreciation. The definition is not met if the
property is used in any way to facilitate the delivery of services or the production of goods or is held for sale. 
Investment Property is measured initially at cost and thereafter at fair value, being the price that would be received by
selling such an asset in an orderly transaction between market participants at the measurement date. Investment Property
is measured at highest and best use and the properties are not depreciated. Properties are reviewed each year and if it is
deemed that there has been a material change in value or circumstance are revalued. Gains and losses on revaluation
are recognised in the Financing and Investment Income and Expenditure line in the Comprehensive Income and
Expenditure Statement (CIES). The same treatment applies to gains and losses on disposal. 
Gains and losses on revaluation and disposal reflected in the CIES are not charges to the General Fund and are transferred
to the Capital Adjustment Account and Capital Receipts Reserve and reported in the Movement in Reserves Statement.
Page 84

Page 85

73
Moray Council Unaudited Annual Account 2022/23
Note 17 Investment Property (continued) 
The following items of income and expense have been accounted for in the Financing and Investment Income and
Expenditure line in the Comprehensive Income and Expenditure Statement. 
2021/22 2022/23
£000 £000
Rental Income from investment property 4 4              
Net gain 4 4
There are no restrictions on the Council's ability to realise the value inherent in its investment property or on the Council's
right to the remittance of income and the proceeds of disposal.  The Council has no contractual obligations to purchase,
construct or develop investment property or for repairs, maintenance or enhancement. 
The following table summarises the movement in the fair value of investment properties over the year: 
2021/22 2022/23
£000 £000
Balance at start of the year 862           222          
Net gains/(losses) from fair value adjustments -                -               
Transfers (to)/from Property, Plant and Equipment -                153          
Disposals (640)         -               
Balance at end of the year 222           375           
Note 18 Intangible Assets 
The Council accounts for its software as intangible assets, to the extent that the software is not an integral part of a
particular IT system and is accounted for as part of the hardware item of Property, Plant and Equipment. The intangible
assets are purchased licences. All software is given a finite life based on assessments of the period that the software is
expected to be of use to the Council. The useful lives assigned to the software suites used by the Council are: 
Licences
Expected Useful Life  £000 
5 - 6 years 252 
The carrying amount of licences is amortised on a straight line basis. The amortisation of £0.007m charged to revenue in
2022/23 (2021/22 £0.013m) was charged to the IT Administration cost centre and then absorbed as an overhead across
all the service headings in the Net Expenditure of Services.  It is not possible to quantify exactly how much of the
amortisation is attributable to each service heading. 
The movement on Intangible Assets during the year is as follows:- 
2021/22 Restated 2022/23
£000 £000
Balance at start of the year:
Gross carrying amount 252                         252      
Accumulated amortisation (209)                        (222)    
Net carrying amount at start of year 43                           30        
Amortisation for the period (8)                            (7)         
Accumulated amortisation
Net carrying amount at end of year 35                           23        
Gross carrying amount 252                         252      
Accumulated amortisation (222)                        (229)    
30                           23         
Page 85

Page 86

74
Moray Council Unaudited Annual Account 2022/23
Note 19 Financial Instruments 
Financial Instruments – Classifications
A financial instrument is a contract that gives rise to a financial asset of one entity and a financial liability or equity
instrument of another. Non-exchange transactions, such as those relating to taxes and government grants, do not give
rise to financial instruments. 
Financial Liabilities
A financial liability is an obligation to transfer economic benefits controlled by the Council and can be represented by a
contractual obligation to deliver cash or financial assets or an obligation to exchange financial assets and liabilities with
another entity that is potentially unfavourable to the Council. 
The financial liabilities held during the year are measured at amortised cost and comprised:
• Long term loans from the Public Works Loan Board (PWLB) and commercial lenders;
• Short term loans from other local authorities;
• Lease payables detailed in note 39;
• Public Private Partnership contracts detailed in note 40;
• Trade payables for goods and services received. 
Financial Assets
A financial asset is a right to future economic benefits controlled by the Council that is represented by cash, equity
instruments or a contractual right to receive cash or other financial assets or a right to exchange financial assets and
liabilities with another entity that is potentially favourable to the Council. 
The financial assets held during the year are accounted for under the following classification:
• Amortised cost (where cash flows are solely payments of principal and interest and the Council’s business model
is to collect those cash flows) comprising:
o Cash in hand;
o Bank current and deposit accounts with Bank of Scotland, Standard Life Liquidity Fund, Federated Short
Term Sterling Liquidity Fund, Blackrock Liquidity Fund, Insight Liquidity Fund and CCLA Public Sector
Fund;
o Trade receivables for goods and services provided. 
Financial assets held at amortised cost are shown net of a loss allowance reflecting the statistical likelihood that the
borrower or debtor will be unable to meet their contractual commitments to the Council. 
Financial Instruments – Balances
The financial liabilities disclosed in the Balance Sheet are analysed across the following categories 
Long Term Short Term Long Term Short Term
£000 £000 £000 £000
Amortised Cost:
Borrowing 160,784    75,973       152,897    88,123      
Creditors 55,207      44,360       54,346      48,254      
Total 215,991    120,333     207,243    136,377    
2021/22 2022/23
Page 86

Page 87

75
Moray Council Unaudited Annual Account 2022/23
Note 19 Financial Instruments (continued) 
Income, Expense, Gains and Losses
The gains and losses recognised in the Comprehensive Income and Expenditure Statement are made up as follows: 
Financial
Liabilities
measured at
amortised
cost
Financial
Assets:
Loans and
Receivables Total
Financial
Liabilities
measured
at
amortised
cost
Financial
Assets:
Loans and
Receivables Total
£000 £000 £000 £000 £000 £000
Interest Expense 12,282         12,282     12,377      12,377    
Impairment Losses 261                261           444              444          
Total expense in Surplus
or Deficit on the Provision
of Services 12,282         261                12,543     12,377      444              12,821    
Interest Income -                     (236)              (236)         (1,119)         (1,119)     
Total income in Surplus or
Deficit on the Provision of
Services -                     (236)              (236)         -                  (1,119)         (1,119)     
Net (gain)/loss for the year 12,282         25                  12,307     12,377      (675)             11,702    
2021/22 2022/23
Financial Instruments – Fair Value
Financial instruments, except those classified at amortised cost, are carried in the Balance Sheet at fair value. For most
assets, the fair value is the market price. 
The fair value of financial instruments classified at amortised cost have been estimated by calculating the net present value
of the remaining contractual cash flows at 31 March, using the following methods and assumptions: 
• Loans borrowed by the Council have been valued by discounting the contractual cash flows over the whole life
of the instrument at the appropriate market rate for local authority loans;
• The value of “Lender’s Option Borrower’s Option” (LOBO) loans have been increased by the value of the
embedded options. Lender’s options to propose an increase to the interest rate on the loan have been valued
according to a proprietary model for Bermudan cancellable swaps. Borrower’s contingent options to accept the
increased rate or repay the loan have been valued at zero, on the assumption that lenders will only exercise their
option when the market rates have risen above the contractual loan rate;
• The fair value of other long-term loans and investments have been discounted at the market rates for similar
instruments with similar remaining terms to maturity on 31 March;
• The fair values of finance lease assets and liabilities and of PPP scheme liabilities have been calculated by
discounting the contractual cash flows (excluding service charge elements) at the appropriate AA-rated corporate
bond yield;
• No early repayment or impairment is recognised for any financial instrument;
• The fair value of short-term instruments, including trade payables and receivables, is assumed to approximate to
the carrying amount given the low and stable interest rate environment. 
Financial Assets
Fair Value Level
Carrying
Amount Fair Value
Carrying
Amount Fair Value
£000 £000 £000 £000
Short Term Debtors 2 13,298  13,298     12,970  12,970    
Long Term Debtors 2 484        484          439        439         
Total 13,782  13,782     13,409  13,409    
2021/22 2022/23
Page 87

Page 88

76
Moray Council Unaudited Annual Account 2022/23
Note 19 Financial Instruments (continued) 
At 31 March 2023 the Council's financial assets show the carrying value equal to fair value, the same as the previous year.
This is mainly due to a large proportion of the amount being short term financial assets (£13.409m). 
Financial Liabilities
Fair Value Level
Carrying
Amount Fair Value
Carrying
Amount Fair Value
£000 £000 £000 £000
Financial liabilities held at amortised cost:
Short Term Creditors 2 44,180     44,180     48,254     48,254    
Short Term Borrowing 2 75,973     75,973     88,123     88,123    
Other Long Term liabilities 2 3,876       3,876       4,337       4,337      
Long Term Borrowing 2 160,784   244,703   152,897   176,841  
PPP and Finance Lease liabilities 2 51,331     74,485     50,009     59,725    
Total 336,144   443,217   343,620   377,280  
2021/22 2022/23
The fair value is higher than the carrying amount because the Council's portfolio of loans includes a number of fixed rate
loans with the Public Works Loan Board (PWLB) which are not based on market terms. It also includes the Education
Services Public Private Partnership 30 year finance lease for Elgin Academy and Keith Primary and the Design, Build,
Finance and Maintain 25 year lease for Elgin High School. 
Fair Value Disclosure of PWLB Loans
The fair value of PWLB loans of £147.615m measures the economic effect of the terms agreed with the PWLB compared
with estimates of the terms that would be offered for market transactions undertaken at the Balance Sheet date. The
difference between the carrying amount and the fair value measures the additional interest that the Council will pay over
the remaining terms of the loans under the agreements with the PWLB, against what would be paid if the loans were at
prevailing market rates. 
As the Council has a continuing ability to borrow at concessionary rates from the PWLB rather than from the markets, a
supplementary measure of the additional interest that the Council will pay as a result of its PWLB commitments for fixed
rate loans is to compare the terms of these loans with the new borrowing rates available from the PWLB. If a value is
calculated on this basis, the carrying amount of £152.897m of total long term borrowing would be valued at £176.841m.
However, if the Council sought to repay the loans to the PWLB, the exit price for the PWLB loans would be £260.560m. 
Page 88

Page 89

77
Moray Council Unaudited Annual Account 2022/23
Note 20 Inventories 
2021/22
Balance
at 1 April Purchases
Recognised as
an expense in
the year
Balance
at 31
March
£000 £000 £000 £000
Building Services 271           695              (708)                      258          
Fleet Services 256           2,764          (2,696)                  324          
Roads Maintenance 205           434              (454)                      185          
Donated PPE 478           307              (136)                      649          
Other 295           1,393          (1,462)                  226          
Total 1,505       5,593          (5,456)                  1,642      
2022/23
Balance
at 1 April Purchases
Recognised as
an expense in
the year
Balance
at 31
March
£000 £000 £000 £000
Building Services 258           978              (862)                      374          
Fleet Services 324           3,106          (3,143)                  287          
Roads Maintenance 185           759              (745)                      199          
Donated PPE 649           -                   -                             649          
Other 226           1,752          (1,673)                  305          
Total 1,642       6,595          (6,423)                  1,814       
Note 21 Short Term Debtors 
2021/22 2022/23
£000 £000
Trade Receivables 1,239       1,857      
Prepayments 1,765       1,222      
Other Receivable Amounts 12,059     11,114    
15,063     14,193    
Prepayments included in debtors (1,765)      (1,222)     
Total Financial Assets Current Debtors 13,298     12,970     
Note 22 Debtors from Local Taxation 
2021/22 2022/23
Council Tax Council Tax
£000 £000
Less than 1 year 1,714          1,754         
One to two years 2,922          2,994         
Three to five years 2,610          2,726         
More than 5 years 9,666          10,520       
16,912        17,994       
Impairment Allowance (14,958)       (15,944)      
Total (net of impairment) 1,954          2,050          
Page 89

Page 90

78
Moray Council Unaudited Annual Account 2022/23
Note 23 Assets Held-for-Sale 
When it becomes probable that the carrying amount of an asset (land and buildings) will be recovered through a sale rather
than through its continued use, it is reclassified as an Asset Held-for-Sale. The asset is revalued immediately before
reclassification and then carried at the lower of this amount and fair value less costs to sell.  Non-current assets held-for-
sale are not depreciated. 
Vehicles, Plant, Furniture and Equipment and assets that are to be abandoned or scrapped are not reclassified as Assets
Held-for-Sale. 
Current Assets Current Assets
2021/22 2022/23
£000 £000
Balance at 1 April 1,000                 877                    
Assets reclassified from Property, Plant and Equipment 1,602                 498                    
Revaluation gains/(losses) (34)                      -                         
Disposals (1,691)                (912)                  
Balance at 31 March 877                     463                     
Note 24 Cash and Cash Equivalents 
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty on notice of not
more than 24 hours. Cash equivalents are investments that mature in three months or less from the balance sheet date
and that are readily convertible to known amounts of cash with insignificant risk of change in value. In the Cash Flow
Statement, cash and cash equivalents are shown net of bank overdrafts that are repayable on demand and form an integral
part of the Council's cash management. 
2021/22 2022/23
£000 £000
Cash Held by the Council 16             18            
Bank Current/Call Accounts 15,393     11,016    
Total 15,409     11,034     
Note 25 Short Term Creditors     
2021/22 2022/23
£000 £000
Trade Payables 16,222     27,209    
Other Payables 32,043     28,088    
Total 48,265     55,297    
Tax Creditors included above (3,545)      (5,036)     
Receipts in advance included above (540)         (2,007)     
Total Financial Liabilities Current Creditors 44,180     48,254     
Page 90

Page 91

79
Moray Council Unaudited Annual Account 2022/23
Note 26 Provisions 
Equal Pay Total
£000 £000
Balance as at 1 April 2022 149           149          
Settlements made/provision released in 2022/23 -                -               
Increase in provision in 2022/23 -                -               
Balance as at 31 March 2023 149           149           
The Council believes that the amounts provided represent the best estimate of the total liability. 
Note 27 Usable Reserves 
The Council has several reserve funds within this category:
• The Insurance Fund covers the main classes of insurance and is earmarked to pay any uninsured losses on
school buildings. The Repairs and Renewal Fund provides for the upkeep of property assets held by the Council.
Together these are the Revenue Statutory Funds on the Balance Sheet;
• The Capital Fund is used to meet the costs of capital investments in assets and for the repayment of the principal
element of borrowings;
• Capital Grants and Receipts Unapplied holds the grants and contributions received towards capital projects for
which the Council has met the conditions that would otherwise require repayment of the monies but which have
yet to be applied to meet expenditure;
• The Capital Receipts Reserve holds the proceeds from the disposal of land or other assets, which are restricted
by statute from being used other than to fund new capital expenditure or to be set aside to finance historical
capital expenditure. 
The movements on the Usable Reserves are detailed in the Movement in Reserves Statement and in Notes 10 and 11.
A summary of the Reserves is also shown on the Balance Sheet. 
Note 28 Unusable Reserves 
2021/22
Restated 2022/23
£000 £000
408,211   Capital Adjustment Account 416,000    
417,278   Revaluation Reserve 466,344    
(5,716)      Financial Instruments Adjustment Account (5,404)       
(7,825)      Employee Statutory Adjustment Account (8,462)       
(54,558)    Pensions Reserve 161,095    
757,390   1,029,573 
Page 91

Page 92

80
Moray Council Unaudited Annual Account 2022/23
Note 28 Unusable Reserves (continued) 
Capital Adjustment Account
The Capital Adjustment Account absorbs the differences arising from the different arrangements for accounting for the
consumption of non-current assets and for financing the acquisition, construction or enhancement of those assets under
statutory provisions. The Account also contains revaluation gains accumulated on Property, Plant and Equipment before
1 April 2007, the date that the Revaluation Reserve was created to hold such gains. 
2021/22
Restated
£000 £000 £000
396,945   Balance at 1 April 408,211  
Reversal of items relating to capital expenditure debited or credited to the
Comprehensive Income and Expenditure Statement:
(23,084)    Charges for depreciation and impairment of non-current assets (26,666)   
7,782       Revaluation losses on Property, Plant and Equipment (3,715)     
(13)            Amortisation of Intangible Assets (7)             
(9,988)     
Amounts of non-current assets written off on disposal or sale as part of the
loss on disposal to the Comprehensive Income and Expenditure Statement (1,506)     
(25,303)    (31,894)   
4,818       Adjusting amount written out of the Revaluation Reserve 11,333    
(20,485)   
Net written out amount of the cost of non-current assets comsumed in the
year (20,561)   
Capital financing applied in the year:
14,267    
Capital grants and contributions credited to the Comprehensive Income and
Expenditure Statement that have been applied to capital financing 21,857    
-               
Application of grants to capital financing from the Capital Grants Unapplied
Account 298          
11,412    
Statutory ptovision for the financing of capital investment charged against the
General Fund and HRA balances 4,110      
6,072       Capital expenditure charged against the General Fund and HRA balances 2,085      
31,751     28,350    
-               
Movements in the market value of Investment Properties debited or credited
to the Comprehensive Income and Expenditure Statement -               
408,211   Balance at 31 March 416,000  
2022/23
Revaluation Reserve
The Revaluation Reserve contains gains made by the Council arising from increases in the value of its Property, Plant and
Equipment, Heritage Assets and Intangible Assets. The reserve contains only revaluation gains accumulated since 1 April
2007, the date that the Reserve was created. 
2021/22
Restated
£000 £000 £000
292,449   Balance at 1 April 417,278  
140,844   Upward Revaluation of assets 60,399    
(5,274)     
Downward revaluation of assets and impairment losses not charged to the
Surplus on the Provision of Services -               
135,570  
Surplus /(deficit) on revaluation of non-current assets not posted to the
Surplus on the Provision of Services 60,399    
(5,923)      Difference between fair value depreciation and historical cost depreciation (10,479)   
(4,818)      Accumulated gains on assets sold or scrapped (854)        
(10,741)    Amount written off to the Capital Adjustment Account (11,333)   
417,278   Balance at 31 March 466,344  
2022/23
Page 92

Page 93

81
Moray Council Unaudited Annual Account 2022/23
Note 28 Unusable Reserves (continued) 
Financial Instruments Adjustment Account
The Financial Instruments Adjustment Account absorbs the timing differences arising from the different arrangements for
accounting for income and expenses relating to certain financial instruments and for bearing losses or benefiting from
gains per statutory provisions.  The Council uses the Account to manage premiums paid on early redemption of loans. As
a result, the balance on the Account at 31 March 2021 will be charged to the General Fund over the next 35 years 
2021/22 2022/23
£000 £000
(6,025)      Balance at 1 April (5,716)     
309          
Proportion of premiums incurred in previous financial years to be charged
against the General Fund balance in accordance with statutory requirements 312          
-               
Amount by which finance costs charged to the Comprehensive Income and
Expenditure Statement are different from finance costs chargeable in the year in
accordance with statutory requirements -               
(5,716)      Balance at 31 March (5,404)       
Employee Statutory Adjustment Account
The Employee Statutory Adjustment Account absorbs the differences that would otherwise arise on the General Fund
Balance from accruing for compensated absences earned but not taken in the year, e.g. annual leave entitlement carried
forward at 31 March. Statutory arrangements require that the impact on the General Fund Balance is neutralised by
transfers to or from the Account. 
2021/22 2022/23
£000 £000
(7,074)      Balance at 1 April (7,825)     
7,074       Settlement or cancellation of accrual made at the end of the preceding year 7,825      
(7,825)      Amounts accrued at the end of the current year (8,462)     
(751)        
Amount by which officer remuneration charged to the Comprehensive Income and
Expenditure Statement on an accruals basis is different from remuneration
chargeable in the year in accordance with statutory requirements (637)        
(7,825)      Balance at 31 March (8,462)       
Pensions Reserve 
The Pensions Reserve absorbs the timing differences arising from the different arrangements for accounting for post-
employment benefits and for funding benefits in accordance with statutory provisions. The Council accounts for post-
employment benefits in the Comprehensive Income and Expenditure Statement as the benefits are earned by accruing
years of service, updating the liabilities recognised to reflect inflation, changing assumptions and investment returns on
any resources set aside to meet the costs. However, statutory arrangements require benefits earned to be financed as the
Council makes employer's contributions to pension funds or eventually pays any pensions for which it is directly
responsible. The debit balance on the Pensions Reserve, therefore, shows a substantial shortfall in the benefits earned by
past and current employees and the resources the Council has set aside to meet them. The statutory arrangements will
ensure that funding will have been set aside by the time the benefits come to be paid. 
2021/22 2022/23
£000 £000
(51,963)    Balance at 1 April (54,558)   
13,274     Remeasurements (assets and liabilities) 231,985  
(31,510)   
Reversal of items relating to retirement benefits debited or credited to the Surplus or
Deficit on the Provision of Services in the Comprehensive Income and Expenditure
Statement (33,608)   
15,641     Employer's pensions contributions and direct payments to pensioners payable in the ye 17,276    
(54,558)    Balance at 31 March 161,095   
Page 93

Page 94

82
Moray Council Unaudited Annual Account 2022/23
Note 29 Capital Grants and Receipts Unapplied Account 
The Capital Grants and Receipts Unapplied Accounts holds the grant and contributions received towards capital projects
for which the Council has met the conditions that would otherwise require repayment of the monies but which have yet to
be applied to meet expenditure. The balance is restricted by grant terms as to the capital expenditure against which it can
be applied and the financial year in which this can take place. 
It also holds capital receipts to fund qualifying expenditure on service transformation and service redesign projects. 
2021/22 2022/23
£000 £000
Capital Grants
Opening Balance 1,082   2,299  
Additions 1,217   -           
Applied -            (298)    
Closing Balance 2,299   2,001  
Capital Receipts for Transformation Projects
Opening Balance 2,722   3,730  
Additions 1,281   1,014  
Applied (290)     (4,727) 
Closing Balance 3,713   17        
Interest on Revenue Balances 17         127      
Total opening balance at 1 April 3,804   6,029  
Total closing balance at 31 March 6,029   2,145   
Note 30 Cash Flow Statement - Operating Activities 
The cash flows for operating activities include the following items: 
2021/22 2022/23
£000 £000
Interest Received 240           1,121      
Interest Paid (12,351)    (11,875)     
Note 31 Cash Flow Statement - Investing Activities 
2021/22 2022/23
£000 £000
Purchase of property, plant and equipment, investment property and intangible assets (41,664)    (44,617)   
Other payments for investing activities (3)              -               
Other receipts from investing activities 18,552     23,603    
Net cash flows from investing activities (23,115)    (21,014)     
Page 94

Page 95

83
Moray Council Unaudited Annual Account 2022/23
Note 32 Cash Flow Statement - Financing Activities 
2021/22 2022/23
£000 £000
Cash receipts of short-term and long-term borrowing 68,000   56,500  
Cash payments for the reduction of the outstanding liabilities relating to finance leases (1,594)    (1,500)   
Repayment of short and long-term borrowing (85,152) (52,736)
Other payments/(receipts) for financing activities (2,350)    3,663    
Net cash flows from financing activities (21,096) 5,927     
Note 33 Reconciliation of Liabilities Arising from Financing Activities 
Balance
at 1 April
Financing
Cash
Flows
Balance
at 31
March
Acquisition Other
£000 £000 £000 £000 £000
Long Term Borrowing 160,784   (7,887)      -                -                152,897  
Short Term Borrowing 75,973     11,368     -                782           88,123    
On balance sheet PFI liabilities 52,831     (1,500)      -                -                51,331    
Other deferred liabilities 268           -                -                3               271          
Total Liabilities from Financing Activities 289,856   1,981       -                785           292,622  
2022/23
Changes which are
not Financing Cash
Flows
Note 34 External Audit Costs 
The agreed external audit fee for 2022/23 was £0.270m for work undertaken in accordance with the Code of Audit Practice
(2021/22 £0.251m). 
Page 95

Page 96

84
Moray Council Unaudited Annual Account 2022/23
Note 35 Grant Income and Contributions 
The Council credited the following grants, contributions and donations to the Comprehensive Income and Expenditure
Statement in 2022/23. 
2021/22 2022/23
£000 £000
Credited to Taxation and Non-Specific Grant Income
General Revenue Grant 142,144 136,845
National Non Domestic Rate Income 41,260    54,575   
Capital Grants and Contributions 14,267    21,856   
Total 197,671 213,276
Credited to Services
Housing Benefits 12,705    11,976   
Private Sector Housing Grant 395         463        
Home Energy Efficiency Programme Scotland 765         564        
Covid Education Grants 543         -              
Criminal Justice 1,336      1,456     
Pupil Equity Funding (PEF) 1,673      1,484     
ELC Expansion 10,452    9,359     
PPP Funding 2,219      2,219     
Ukranian Resettlement Scheme -               1,039     
Moray Growth Deal -               1,444     
Employability Moray 4              652        
Other Grants 3,989      4,839     
Contributions
Integration Joint Board 66,311    73,765   
Other Contributions 241         268        
NHS Grampian 114         271        
Donations 1              2             
Total 100,748 109,801 
The Council has received a number of grants, contributions and donations that have yet to be recognised as income as
they have conditions attached to them that may require the monies or property to be returned to the giver. 
The balances at the year-end are as follows: 
2021/22 2022/23
£000 £000
Grants received in advance
Capital Grants 3,608   4,066  
Other Grants 921       2,007  
Total 4,529   6,073   
Page 96

Page 97

85
Moray Council Unaudited Annual Account 2022/23
Note 36 Related Parties 
The Council is required to disclose material transactions with related parties - bodies or individuals that have potential to
control or influence the Council, or to be controlled or influenced by the Council. 
The Scottish Government has effective control over the general operations of the Council. It is responsible for providing
the statutory framework within which the Council operates, provides the majority of its funding and prescribes the terms of
many of the transactions that the Council has with other parties (e.g. Council Tax Bills). Government grants and
contributions are included in note 35. The amounts outstanding at the year-end are included in creditors in note 25. 
Members of the Council have direct control over the Council's financial and operating policies. During 2022/23 no works
or services were commissioned from companies in which any member had a noted interest.  Details of members’ expenses
are included in the Remuneration Report. 
Moray Integration Joint Board
The Moray Integration Joint Board was established on 1 April 2016 as a partnership between Moray Council and NHS
Grampian and is responsible for planning and overseeing the delivery of a full range of community health and social work
services including those for older people. In the year 2022/23 the following financial transactions were made with Moray
Council relating to the integrated and social care functions: 
Transactions with other bodies are as follows: 
2021/22 2022/23 2021/22 2022/23
£000 £000 £000 £000
NHS Grampian
Funding received 114       271       82               93              
Moray Integration Joint Board
Funding received from MIJB 66,311 73,765 (1,282)        (1,836)       
Contribution to MIJB 47,475 55,936 -                  -                 
European Union
Funding received 342       1,143    439             1,027        
Grampian Valuation Joint Board
Contribution to GVJB 792       776       -                  -
Debtors/(Creditors)
Within the cash and cash equivalents balance as disclosed by the Council are a number of balances held on behalf of
other bodies as follows: 
2021/22 2022/23
£000 £000
Grampian Valuation Joint Board 1,380   1,205  
Trust Funds 2,269   2,196  
Common Good 3,897   3,982   
The Council provided material financial assistance to Moray Leisure Limited of £0.664m in 2022/23 (2021/22 £0.534m). 
The Council participates in the following partnerships: 
2021/22 2022/23
£000 £000
The Highlands and Islands Transport Partnership - contribution 47             47            
Scotland Excel - contribution 76             79            
SEEMIS Group LLP - contribution 94             103          
Page 97

Page 98

86
Moray Council Unaudited Annual Account 2022/23
Note 37 Capital Expenditure and Capital Financing 
The total amount of capital expenditure incurred in the year is shown in the table below (including the value of assets
acquired under finance leases and PPP contracts), together with the resources that have been used to finance it.  Where
capital expenditure is to be financed in future years by charges to revenue as assets are used by the Council, the
expenditure results in an increase in the Capital Financing Requirement (CFR), a measure of the capital expenditure
incurred historically by the Council that has yet to be financed. The CFR is analysed in the second part of this note. 
2021/22 2022/23
£000 £000
Opening Capital Financing Requirement 341,891 351,981
Capital Investment:
Property, Plant and Equipemnt (incl Held for Sale) 41,840    44,552   
Intangible Assets -              
Heritage Assets -              
Sources of Finance:
Government grants and other contributions (14,267)  (21,857) 
Sum set Aside from Revenue:
Direct revenue contributions (6,072)     (2,085)    
Loans fund principal (11,412)  (4,110)    
Closing Capital Financing Requirement 351,980 368,481
Explantions of movements in year:
Increase/(decrease) in underlying need to borrow (supported by government financial
assistance) 10,090    16,500   
Increase/(decrease) in Capital Financing Requirement 10,090    16,500   
During 2022/23 the Council has recognised £20.6 million of loans fund advances (2021/22 £21.5 million). 
Note 38 Capitalisation of Borrowing Costs 
Borrowing costs of £1.737m have been capitalised during 2022/23 (2021/22 £1.076m), using a capitalisation rate of 3.54%. 
Note 39 Leases 
Leases are classified as finance leases where the terms of the lease transfer the majority of the risks and rewards incidental
to ownership of the property from the lessor to the lessee. All other leases are classified as operating leases. Where a
lease covers both land and buildings, the land and buildings elements are considered separately for classification. 
Council as Lessee 
Operating Leases 
Rental paid under operation leases are charged to the appropriate service account in the Comprehensive Income and
Expenditure Statement (CIES) as an expense of the services benefitting from use of the leased asset on a straight line
basis over the term of the lease. 
The Council rents land and buildings under the terms of operating leases. 
Page 98

Page 99

87
Moray Council Unaudited Annual Account 2022/23
Note 39 Leases (continued) 
The future minimum lease payments due under non-cancellable leases in future years are:
2021/22 2022/23
£000 £000
Not later than one year 38         37        
Later than one year and not later than five years 148       139      
Later than five years 1,372   1,390  
Total 1,558   1,566   
The future minimum sublease payments expected to be received by the Council are £0.003m (2021/22 £0.002m). 
The expenditure charged to the CIES during the year in relation to minimum lease payments was £0.037m (2021/22
£0.038m). 
Council as Lessor 
Operating Leases 
Where the Council grants an operating lease the asset is retained on the Balance Sheet. The Council leases out various
properties, predominately industrial units. 
The future minimum lease payments receivable under non-cancellable leases in future years are:- 
2021/22 2022/23
£000 £000
Not later than one year 758       717      
Later than one year and not later than five years 2,782    2,722   
Later than five years 31,940 32,109
Total 35,480 35,548 
Page 99

Page 100

88
Moray Council Unaudited Annual Account 2022/23
Note 40 Public Private Partnership and Similar Contracts 
Public Private Partnership (PPP) and similar contracts are agreements to receive services, where responsibility for making
available the property, plant and equipment needed to provide those services passes to the contractor. As the Council is
deemed to control the services that are provided under its scheme and as ownership of the property, plant and equipment
will pass to the Council at the end of the contract for no additional charge, the Council carries the assets used under the
contracts on its Balance Sheet as part of Property, Plant and Equipment. 
The original recognition of these assets at fair value (based on cost to purchase property, plant and equipment) was
balanced by the recognition of a liability for amounts due to the scheme operator to pay for the capital investment. 
Non-current assets recognised on the Balance Sheet are revalued and depreciated in the same way as property, plant
and equipment owned by the Council. 
The amounts payable to the contractor each year are analysed into five elements: 
• fair value of services received during the year - debited to the relevant service in the Comprehensive Income and
Expenditure Statement.
• finance cost - an interest charge on the outstanding Balance Sheet liability, debited to the Financing and
Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement. This is
currently 8.39% for the Elgin Academy/Keith Primary School PPP scheme and 5.67% for the Elgin High School
Design, Build, Finance and Maintain (DBFM) contract.
• contingent rent - increases in the amount to be paid for the property arising during the contract, debited to the
Financing and Investment Income and Expenditure line in the Comprehensive Income and Expenditure
Statement.
• payment towards liability - applied to write down the Balance Sheet liability towards the operator (the profile of
write-downs is calculated using the same principles as for a finance lease).
• lifecycle replacement costs - debited to the relevant service in the Comprehensive Income and Expenditure
Statement or recognised as additions to Property, Plant and Equipment when the relevant capital works are
carried out. 
Educational Services PPP Scheme
In 2011/12, the Council entered into a 30 year PPP contract for the construction, maintenance and operation of two schools
in Keith and Elgin. The contractor took on the obligation to construct the schools and maintain them in a minimum
acceptable condition. The annual unitary charge in 2022/23 was £5.367m (2021/22 £5.170m). 
Educational Services DBFM Contract
In 2017/18, the Council entered into a 25 year DBFM contract for the construction, maintenance and operation of a new
school in Elgin. The contractor took on the obligation to construct the school and maintain it in a minimum acceptable
condition. The Annual Service Charge in 2022/23 was £2.590m (2021/22 £2.545m) 
Page 100

Page 101

89
Moray Council Unaudited Annual Account 2022/23
Note 40 Public Private Partnership and Similar Contracts (continued) 
Property, Plant and Equipment 
2021/22 2022/23
£000 £000
Cost or valuation
at 1 April 69,340   82,653
Additions 49           -            
Revaluations 13,264   7,014   
82,653   89,667
Accumulated Depreciation
At 1 April 7,994     -            
Revaluations -              -            
Depreciation charge 2,670     3,230   
Depreciation write back (10,664) (3,230) 
-              -            
Net Book Value 82,653   89,667 
Payments
Under the contracts the Council makes agreed payments each year which are increased by inflation. They can be reduced
if the contractors fail to meet availability and performance standards in any year but are otherwise fixed.  Payments
remaining to be made under the contract at 31 March 2023 (excluding any estimation of inflation and
availability/performance deductions) are as follows: 
Payment
for
Services
Reimbursement
of Capital
Expenditure Interest Total
£000 £000 £000 £000
Payable in 2023/24 1,184          1,322                  3,677    6,183     
Payable within 2 to 5 years 4,735          6,173                  13,713 24,621   
Payable within 6 to 10 years 5,918          10,229                14,382 30,529   
Payable within 11 to 15 years 5,919          15,332                10,038 31,289   
Payable within 16 to 20 years 4,858          18,275                3,608    26,741   
Total 22,614        51,331                45,418 119,363 
Although the payments made to the contractors are described as unitary payments, they have been calculated to
compensate the contractor for the fair value of the services they provide, the capital expenditure incurred and interest
payable whilst the capital expenditure remains to be reimbursed.  The liability outstanding to pay the contractors for capital
expenditure incurred is as follows: 
2021/22 2022/23
£000 £000
Balance outstanding at start of year 54,360 52,831
Payments during the year (1,529)  (1,500) 
Balance outstanding at year-end 52,831 51,331 
Page 101

Page 102

90
Moray Council Unaudited Annual Account 2022/23
Note 41 Pension Schemes Accounted for as Defined Contribution Schemes 
The Council participates in the Scottish Teachers’ Superannuation Scheme. The scheme is an unfunded statutory public
service pension scheme with benefits underwritten by the UK Government. The scheme is financed by payments from
employers and from those current employees who are members of the scheme and paying contributions at progressively
higher marginal rates based on pensionable pay, as specified in the regulations. The rate of employer contributions is set
with reference to a funding valuation undertaken by the scheme actuary. 
Teachers employed by the Council are members of the Scottish Teachers' Superannuation Scheme administered by the
Scottish Public Pensions Agency (SPPA), an executive agency of the Scottish Government. It is a defined benefit scheme
providing teachers with specified benefits upon their retirement and the Council contributes towards the costs by making
contributions based on a percentage of members' pensionable salaries. 
As the scheme is unfunded there can be no surplus or shortfall. Pension contribution rates will be set by the scheme at a
level to meet the cost of pensions as they accrue. It is not possible, however, for the Council to identify a share of the
underlying financial position and performance of the scheme with sufficient reliability for accounting purposes. For the
purpose of the annual accounts it is therefore accounted for on the same basis as a defined contribution scheme. 
In 2022/23 the Council paid £10.925m in respect of teachers' retirement benefits, of which £1.493m was outstanding at 31
March 2023. The amount payable represents 23% of pensionable pay. In 2021/22 the amounts paid were £9.787m of
which £0.848m was outstanding at 31 March 2022, and 23% of pensionable pay.   
The Council is responsible for the costs of any additional benefits awarded upon early retirement outside the terms of the
Teachers' Scheme. 
Note 42 Defined Benefit Pension Schemes 
Participation in Pension Schemes 
As part of the terms and conditions of employment of its officers, the Council makes contributions towards the cost of post-
employment benefits. Although these benefits will not actually be payable until employees retire, the Council has a
commitment to make the payments (for those benefits) and to disclose them at the time that employees earn their future
entitlement. 
The Council participates in one scheme:
• The North East Scotland Local Government Pension Scheme which is administered by Aberdeen City Council.
This is a funded defined benefit scheme, meaning that the Council and employees pay contributions into a fund,
calculated at a level intended to balance the pension liabilities with investment assets over a period of time. 
There are also arrangements in place for the award of discretionary post-retirement benefits upon early retirement. This is
an unfunded defined benefit arrangement under which liabilities are recognised when awards are made. However, there
are no investment assets built up to meet these pension liabilities and cash has to be generated to meet actual pension
payments as they eventually fall due. 
Principal risks to the scheme are the longevity assumptions, statutory changes to the scheme, changes to inflation, bond
yields and the performance of the investments held by the scheme.  These are mitigated to a certain extent by the statutory
requirements to charge the General Fund the amounts required by statute. 
Transactions Relating to Post-employment Benefits 
In relation to the Local Government Pension Scheme, the Council recognises the cost of retirement benefits in the reported
cost of services when they are earned by employees, rather than when the benefits are eventually paid as pensions.
However, the charge required to be made against Council Tax is based on cash payable in the year, so the real cost of
post-employment/retirement benefits is reversed out of the General Fund via the Movement in Reserves Statement. 
Page 102

Page 103

91
Moray Council Unaudited Annual Account 2022/23
Note 42 Defined Benefit Pension Schemes (continued) 
The following transactions have been made in the Comprehensive Income and Expenditure Statement and the General
Fund Balance via the Movement in Reserves Statement during the year: 
2021/22 2022/23 2021/22 2022/23
£000 £000 £000 £000
Comprehensive Income and Expenditure
Statement Cost of Services:
Current Service Cost 30,278     31,986     -                -               
Past Service Cost -                -                -                -               
Curtailment Cost -                -                -                -               
Settlement Cost -                -                -                -               
Administration Expenses 304           337           -                -               
30,582     32,323     -                -               
Financing and Investment Income and
Expenditure:
Net Interest Expense 640           921           288           364          
Total Post Employment Benefit Charged to the
Surplus or Deficit on the Provision of Services 31,222     33,244     288           364          
Other Post Employment Benefit Charged to the
Comprehensive Income and Expenditure
Statement
Remeasurement of the net defined benefit liability comprising:
Return on plan assets 3,159       55,193     -                -               
Actuarial gains/(losses) arising from changes in finan(14,207)    (322,463) (79)            (3,149)     
Actuarial gains/(losses) arising from demographic ch (4,032)      (17,330)    (72)            (309)        
Other 1,918       55,200     39             873          
Total Post Employment Benefit Charged to the
Comprehensive Income and Expenditure
Statement 18,060     (196,156) 176           (2,221)     
Movement in Reserves Statement
Reversal of net charges made to the Surplus or
Deficit on the Provision of Services for post
employment benefits in accordance with the Code (31,222)    (33,244)    (288)         (364)        
Actual amout charged against the General Fund
Balance for pensions in the year:
Employers' contributions payable to scheme 14,673     16,286     -                -               
Retirement benefits payable to pensioners -                -                968           990          
Local Government
Pension Scheme
Discretionary
Benefits
Page 103

Page 104

92
Moray Council Unaudited Annual Account 2022/23
Note 42 Defined Benefit Pension Schemes (continued) 
Assets and Liabilities Recognised in the Balance Sheet 
The amount included in the Balance Sheet arising from the authority's obligation in respect of its defined benefit scheme
is as follows: 
2021/22 2022/23 2021/22 2022/23
£000 £000 £000 £000
Present Value of the defined benefit obligation (793,742) (552,122) (13,468)    (10,257)   
Fair value of plan assets 752,652   723,474   -                -               
Net liability arising from defined benefit obligation (41,090)    171,352   (13,468)    (10,257)   
Local Government
Pension Scheme
Discretionary
Benefits
Reconciliation of Present Value of the Scheme Liabilities (Defined Benefit Obligation) 
2021/22 2022/23 2021/22 2022/23
£000 £000 £000 £000
Opening Balance at 1 April 776,355   793,742   14,260     13,468    
Current Service Cost 30,278     31,986     -                -               
Interest Cost 16,172     22,068     288           364          
Contributions from scheme participants 4,586       5,038       -                -               
Remeasurement (gains)/losses:
Actuarial (gains)/losses arising from changes in financial
assumptions (14,207)    (322,463) (79)            (3,149)     
Actuarial (gains)/losses arising from demographic changes (4,032)      (17,330)    (72)            (309)        
Other 1,918       55,200     39             873          
Past Service Cost -                -                -                -               
(Gains)/Losses on curtailment/settlements -                -                -                -               
Benefits paid (17,328)    (16,119)    (968)         (990)        
Closing Balance at 31 March 793,742   552,122   13,468     10,257    
Local Government
Pension Scheme
Discretionary
Benefits
Reconciliation of the Movements in the Fair Value of Scheme (Plan) Assets 
2021/22 2022/23 2021/22 2022/23
£000 £000 £000 £000
Opening fair value of scheme assets 738,652 752,652 -            -           
Interest Income 15,532    21,147    -           
Remeasurement Gains:
The return on plan assets, excluding the amount in the net interest
expense (3,159)     (55,193)  -           
Contributions from employer 14,673    16,286    968       990      
Contributions from employees into the scheme 4,586      5,038      -            -           
Benefits paid (17,328)  (16,119)  (968)     (990)    
Other - administration expenses (304)        (337)        -           
Closing value of scheme assets 752,652 723,474 -            -           
Local Government
Pension Scheme
Discretionary
Benefits
Page 104

Page 105

93
Moray Council Unaudited Annual Account 2022/23
Note 42 Defined Benefit Pension Schemes (continued) 
Local Government Pension Scheme assets comprised:
Fair value of scheme assets 
Quoted
Prices in
Active
Markets
Prices
not
Quoted in
Active
Markets Total
31 March 2022 £000 £000 £000
UK Equities 162,046 -               162,046
Overseas Equities 289,245 -               289,245
UK Government Bonds 61,717    -               61,717   
Property -               49,073    49,073   
Private Equity -               155,347  155,347
Global Infrastructure 13,021    -               13,021   
Cash Instruments -               22,203    22,203   
Total Assets 526,029 226,623  752,652 
Quoted
Prices in
Active
Markets
Prices not
Quoted in
Active
Markets Total
31 March 2023 £000 £000 £000
UK Equities 177540 -                177,540  
Overseas Equities 225652 -                225,652  
UK Government Bonds 46447 -                46,447    
Other Government Bonds -                -                -               
Other UK Bonds -                -                -               
Other non UK Bonds -                -                -               
Property -                47315 47,315    
Private Equity -                182967 182,967  
Global Infrastructure 15410 -                15,410    
Cash Instruments -                28143 28,143    
Total Assets 465,049   258,425   723,474   
Page 105

Page 106

94
Moray Council Unaudited Annual Account 2022/23
Note 42 Defined Benefit Pension Schemes (continued) 
Basis for Estimating Assets and Liabilities 
Liabilities are valued on an actuarial basis using the projected unit method and assets are measured at their fair value. An
estimate of the pensions that will be payable in future years is dependent on assumptions about mortality rates, salary
levels, etc. 
The most recent actuarial valuation was carried out as at 31 March 2020 and has been updated by Mercer Limited,
independent actuaries to the North East Scotland Pension Fund (NESPF), to take account of the requirements of IAS 19
in order to assess the liabilities of the Pension Funds as at 31 March 2023. The significant assumptions used by the actuary
have been: 
2021/22 2022/23 2021/22 2022/23
Mortality Assumptions:
Longevity at 65 for current pensioners
Men 21.5 21.0 21.5 21.0
Women 24.2 23.4 24.2 23.4
Longevity at 65 for future pensioners
Men 23.0 22.4 -            -           
Women 26.3 25.4 -            -           
Rate of Inflation 3.30% 2.70% 3.50% 2.70%
Rate of increase in salaries 4.80% 4.20% -            -           
Rate of increase in pensions 3.40% 2.80% 3.60% 2.80%
Rate for discounting scheme liabilities 2.80% 4.80% 2.80% 4.90%
Local
Government
Pension Scheme
Unfunded
Liabilities
Discretionary
Benefits
The estimation of the defined benefit obligations is sensitive to the actuarial assumptions set out in the table above.  The
sensitivity analyses below have been determined based on reasonably possible changes of the assumptions occurring at
the end of the reporting period, and assume for each change that the assumption analysed changes while all the other
assumptions remain constant. 
Increase in
Assumption
Decrease in
Assumption
£000 £000
Impact on the Defined Benefit Obligation in the Scheme
Longevity (increase or decrease in 1 year) 11,487        (11,487)      
Rate of inflation (increase or decrease by 0.1%) 23,689        (23,689)      
Rate of increase in salaries (increase or decrease by 0.1%) 2,578          (2,578)         
Rate of increase in pensions (increase or decrease by 0.1%) (43,729)       43,729         
Page 106

Page 107

95
Moray Council Unaudited Annual Account 2022/23
Note 42 Defined Benefit Pension Schemes (continued) 
Funding Strategy Statement 
The Funding Strategy Statement sets out how the administering authority balances the potentially conflicting aims of
affordability of contributions, transparency of process, stability of employers' contributions and prudence in the funding
basis. 
The Pensions Committee's long-term funding objective is to achieve and maintain assets equal to 100% of projected
accrued liabilities, assessed on an ongoing basis.  The current actuarial valuation of the Fund is effective as at 31 March
2020 and the results indicate that overall the assets represented 103% of projected accrued liabilities at the valuation date. 
Investments that would most closely match the pension liabilities would be gilts, predominately index-linked, reflecting the
nature of the Fund's liabilities.  The Fund, however, invests in other assets in the expectation that these will provide higher
returns albeit without any guarantee that higher returns will be achieved over any particular period.  The benefit of higher
investment return is that, over the long term, a higher level of funding should achieve lower employer contribution rates. 
However the additional investment returns from growth assets come with a price:  greater volatility relative to the liabilities
thus introducing risk.  There is a trade-off between the benefits of additional investment return from greater exposure to
growth assets and the greater predictability from having greater exposure to liability matching assets. 
The asset proportions of the Fund at 31 March 2023, with March 2022 in brackets were: equities, including alternatives
83.15% (82.33%), bonds 6.42% (8.2%), property 6.54% (6.52%) and cash 3.89% (2.95%).   
Impact on the Council's Cash Flows 
While the Fund’s main objective is to ensure solvency of the NESPF they also aim to keep employers' contributions at as
constant a rate as possible. Following the 2020 valuation the Pensions Committee has agreed a strategy with the scheme's
actuary to achieve a funding level of 100% over an average surplus spread period of 24 years and have maintained an
employer contribution rate requirement of 19.3% for local authorities across the scheme.  During the valuation process
employer rates are set for a period of three years. The latest triennial valuation was as at 31 March 2020 to determine a
funding level and set the rates for 2021/22 onwards. 
The employer contributions expected to be made to the Local Government Pension Scheme in the year to 31 March 2023
is £16.282m. Expected contributions for Discretionary Benefits in the year to 31 March 2023 are £1.014m. 
The weighted average duration of the defined benefit obligation for scheme members at the 31 March 2020 valuation is
18 years. 
Page 107

Page 108

96
Moray Council Unaudited Annual Account 2022/23
Note 43 Contingent Liabilities 
Bilbohall South Land
On 30 March 2016 the Council decided to remove the Western Link Road from the capital plan. Due to the cancellation of
this project, the Council will be unable to comply with the terms of the purchase agreement with Grampian Housing
Association (GHA) to buy land at Bilbohall South in Elgin. As a result the Council may have to re-purchase this site. This
presents a potential financial risk to the Housing Revenue Account (HRA). 
However, both the Council and GHA agreed to alter the missives to extend the buy-back period until 31 March 2024. In
agreeing to the extension to the buy-back period both parties sought consent of the Scottish Government, which has
assumed administrative responsibility for the grant given to GHA to purchase the site. 
A masterplan for development of a wider area at Bilbohall has been finalised. The planning application was considered
and approved at the meeting of Planning and Regulatory Services Committee on 23 March 2021. A tender for the contract
was published in March 2021 but this resulted in no tenders being received with volatility in the supply chain cited as the
reason. The same tender was reissued in December 2021 with a return date of 19 April 2022. The second tender has
resulted in one tender received with a list of clarifications. The Council has engaged HUB North to act as Employers Agent.
HUB North are facilitating detailed discussion with the contractor in an effort to resolve the clarifications, and arrive at a
fixed price Design and Build contract which is acceptable to all parties. HUB North have only been partially successful in
resolving approximately half of the qualifications but have not achieved a fixed price contract which is financially viable.
The development continues to feature prominently in the Strategic Housing Investment Plan approved in December 2021,
with high priority for allocation of Scottish Government More Homes Division Funding. CMT have been updated several
times on the procurement difficulties. More Homes Board will consider procurement options on 11 May 2023. 
Building Dilapidations
The Council leases a number of buildings which will required to be returned to their original leased condition at the end of
the lease. Every attempt is made to maintain leased buildings in reasonable order, however, the Council has a potential
liability to incur re-instatement costs where the condition has deteriorated below that of the original state, the extent of
which cannot be reliably estimated. 
Scottish Child Abuse Enquiry
Survivors of Historic Child Abuse in Care have the option of pursuing claims through civil proceedings and where the
historical care provision crossed current local authority boundaries, any potential financial liability arising from such
proceedings will be subject to agreement on a case by case basis amongst the local authorities concerned. It is therefore
not possible to quantify any future claims. 
Asbestos Related Illness
The Council is aware of two claims for asbestos related illness and is aware of others which may be pursued at a later
date. Work is currently ongoing with other neighbouring Local Authorities on the detail of these. At the moment the extent
of any costs to the Council is unknown, but could be significant. 
Energy from Waste Project
Construction of the joint Local Authority Energy from Waste (EfW) plant in Aberdeen was impacted by the first national
lockdown resulting from the Covid-19 pandemic. Under the terms of the agreement the primary supplier is permitted to
claim for exceptional costs associated with a delay outwith their control. The Project Board, representing the Local
Authorities’ interests, is in commercial negotiations as to the value of this claim. Until these negotiations progress to a later
stage it is not possible to quantify the liability, which the Council would share with project partners Aberdeenshire and
Aberdeen City Council. 
Note 44 Nature and Extent of Risks Arising From Financial Instruments 
The Council's activities expose it to a variety of financial risks:
• credit risk - the possibility that other parties might fail to pay amounts due to the Council.
• liquidity risk - the possibility that the Council might not have funds available to meet its commitments to make
payments.
• market risk - the possibility that financial loss might arise for the Council as a result of changes in such measures
as interest rates and stock market movements. 
The procedures for risk management are set out through a legal framework based on the Local Government (Scotland)
Act 2003 and associated regulations, which were both revised in December 2017. These require the Council to comply
with CIPFA Prudential Code, the CIPFA Code of Practice on Treasury Management and Investment Regulations. The
Council's management of treasury risks are structured to minimise the Council's exposure to the unpredictability of financial
markets and to protect the financial resources available to fund services by: 
Page 108

Page 109

97
Moray Council Unaudited Annual Account 2022/23
Note 44 Nature and Extent of Risks Arising from Financial Instruments (continued) 
• formally adopting the requirements of the CIPFA Treasury Management Code of Practice.
• the adoption of a Treasury Management Strategy Statement and incorporating this into the Council's Financial
Regulations.
• approving annually in advance the Council's prudential and treasury indicators and reporting on performance;
• approving an Investment Strategy for the forthcoming year. 
Credit Risk
Credit risk arises from the short-term lending of surplus funds to banks, building societies and other local authorities as
well as credit exposures to the Council's customers. It is the policy of the Council to place deposits only with a limited
number of high quality banks, building societies and Money Market Funds whose credit rating is independently assessed
as sufficiently secure by the Council's treasury advisers and to restrict lending to a prudent maximum amount for each
institution. 
The credit criteria in respect of financial assets held by the Council at 31 March 2023 are detailed below. 
Financial Asset Category Criteria
Banks Long-Term BBB+
Building Societies Long-Term BBB+
Money Market Funds Long-Term AAAmmf (Fitch) or equivalent 
The maximum investment with the Council's own bankers (Bank of Scotland) is £10m and other organisations meeting the
above criteria is £5m. 
In addition to the above, the Council can also invest in Local Authorities and the Debt Management Office. A limit of £5m
is set for any Local Authority and there is no limit for the Debt Management Office as it is part of HM Treasury which has
the UK Government's AA+ rating. 
The following analysis summarises the Council's potential maximum exposure to credit risk, based on past experience and
current market conditions. No credit limits were exceeded during the financial year. The Council does not expect any losses
from non- performance by any of its counterparties in relation to deposits and bonds. 
Estimated
maximum
exposure to
default and
uncollectability
Amounts
at 31
March
2023
Historical
experience
of default
Historical
experience
adjusted for
market
conditions as
at 31 March
22
Estimated
maximum
exposure to
default and
uncollectability
£000 £000 % % £000
Customers 3,063                  3,875       13.90           13.90              539                   
Total 3,063                  3,875       539                     
Debtors
The Council does not generally allow credit for customers. As a result, £3.544m of the £3.875m balance is past
its due date for payment (2021/22 £2.830m). The past due but not impaired amount can be analysed by age as
follows: 
2021/22 2022/23
£000 £000
Less than six months 1,652       1,962      
Six months to one year 359           681          
More than one year 819           901          
Total 2,830       3,544       
Page 109

Page 110

98
Moray Council Unaudited Annual Account 2022/23
Note 44 Nature and Extent of Risks Arising from Financial Instruments (continued) 
The impairments made, analysed by age are as follows:
2021/22 2022/23
£000 £000
Less than six months -           
Six months to one year 180       341      
More than one year 819       901      
Total 999       1,242   
Liquidity Risk
The Council can borrow from the Public Works Loan Board. As a result there is no significant risk that the Council will be
unable to raise finance to meet its commitments under financial instruments. 
Although the Council has 22.13% of its current debt maturing within the period 2051/52 to 2055/56, it is continually
reviewing its borrowing position to minimise the financial impact of debt maturing at any one time in the future and possibly
exposing the Council to unfavourable interest rates. With the assistance of its treasury advisers, the Council manages this
risk through prudent planning of new loans taken out where economic to do so. 
The maturity structure of financial liabilities is as follows (at nominal value): 
2021/22 2022/23
£000 £000
Average Rate Average Rate
Repayment less than 1 year 75,973    2.41% 88,123    2.16%
Repayment between 1 and 2 years 8,035      2.49% 7,250      3.06%
Repayment between 2 and 5 years 17,710    2.83% 15,740    2.94%
Repayment between 5 and 10 years 22,356    3.48% 20,116    4.93%
Repayment between 10 and 15 years 15,606    6.13% 14,716    6.35%
Repayment in more than 15 years 97,077    5.43% 95,075    5.40%
236,757 241,020 
The above figures are the contractual maturity amounts of the loans. 
Market Risk 
Interest Rate Risk
The Council is exposed to interest rate risk in two different ways: the first being the uncertainty of interest paid/received on
variable rate instruments and the second being the effect of fluctuations in interest rates of the fair value of an instrument. 
The current interest rate risk for the Council is summarised below:
• Decreases in interest rates will affect interest earned on variable rate investments, potentially reducing income
credited to the Comprehensive Income and Expenditure Statement. 
• The fair value of fixed rate financial assets will fall if interest rates rise. This will not impact on the Balance Sheet
for the majority of assets held at amortised cost but will impact on the disclosure note for fair value.
• The fair value of fixed rate financial liabilities will rise if interest rates fall. This will not impact on the Balance sheet
for the majority of liabilities held at amortised cost but will impact on the disclosure note for fair value. 
The Council has a number of strategies for managing interest rate risk:
• It is the policy of the Council to limit its exposure to variable rate borrowing to a maximum of 25% of total
borrowing.
• During periods of falling rates and where it is economically advantageous, the Council will consider the repayment
or restructuring of fixed interest rate loans.
• The Council monitors interest rates daily to assist in decisions for lending of surplus cash and new borrowings. 
Page 110

Page 111

99
Moray Council Unaudited Annual Account 2022/23
Note 44 Nature and Extent of Risks Arising from Financial Instruments (continued) 
The Council has a strategy for assessing interest rate exposure. The analysis will advise whether new borrowing taken out
is fixed or variable. During 2022/23 the Council did take out several variable rate temporary borrowing loans. 
According to this assessment strategy, at 31 March 2023, if interest rates had been 1% higher with all other variables held
constant, the financial effect would be: 
2021/22 2022/23
£000 £000
Increase in interest payable on variable rate borrowing 474           244          
Impact on Comprehensive Income and Expenditure Statement 474           244           
Page 111

Page 112

100
Moray Council Unaudited Annual Account 2022/23
Housing Revenue Account Income and Expenditure Statement 
The HRA Income and Expenditure Statement shows the economic cost for the year ended 31 March 2023 of providing
housing services in accordance with generally accepted accounting practices rather than the amount to be funded from
rents and government grants. Councils charge rents to cover expenditure in accordance with regulations; this may be
different from the accounting cost. The increase or decrease in the year, on the basis of which rents are raised, is shown
in the Movement on the HRA Statement. 
2021/22 2022/23
£000 £000
Income
(20,555)        Dwelling Rents (20,975)
(187)              Non Dwelling Rents (193)      
(487)              Other Income (602)      
(21,229)        Total Income (21,770)
Expenditure
4,453            Supervision and Management 5,170    
7,305            Repairs and Maintenance 8,482    
151               Bad and Doubtful Debts 204       
9,564            Depreciation and Impairment of Non-Current Assets 9,090    
(7,359)           Revaluation losses on Non-Current Assets (4,877)   
41                  HRA Share of Corporate and Democratic Core Costs 60          
463               Other Expenditure 475       
14,618          Total Expenditure 18,604  
(6,611)           Net Cost of HRA Services (3,166)   
2,824            Interest Payable and Similar Charges 2,749    
(35)                Interest and Investment Income (173)      
21                  Net Interest on the Defined Benefit Liability 30          
(1,165)           Capital Grants and Contributions Receivable (8,747)   
(4,966)           (Surplus)/Deficit for the Year on HRA Services (9,307)     
Page 112

Page 113

101
Moray Council Unaudited Annual Account 2022/23
Movement on the Housing Revenue Account Statement 
2021/22 2022/23
£000 £000
(4,966)  (Surplus)/Deficit for the Year on the HRA Income and Expenditure Account (9,307) 
(4,124)  Adjustments to Usable Reserves permitted by Accounting Standards (2,264) 
Adjustments between accounting basis and funding basis under regulations
96        
Difference between interest payable and similar charges determined in accordance with the
Code and those determined in accordance with statute 96        
5,522   Capital expenditure funded by the Housing Revenue Account 2,085  
(407)     HRA share of contributions to/(from) the Pensions Reserve (438)    
4           Employee Statutory Adjustment Account (15)       
Transfers to/from the Capital Adjustment Account:
(5,440)  Depreciation and Impairment of Non-Current Assets (6,826) 
7,359   Revaluation losses on Property, Plant and Equipment 4,877  
1,377   Loans fund principal repayments 1,708  
1,165   Capital Grants applied 8,747  
586       Net Decrease Before Transfers to Reserves (1,337) 
Transfers to/(from) Reserves
9           IORB and Statutory Funds 43        
(659)     Transfers to/(from) Reserves 1,341  
(650)     1,384  
(64)        (Increase)/decrease in the year on the HRA 47        
(2,401)  Housing Revenue Account Balance Brought Forward (2,465) 
(2,465)  Housing Revenue Account Balance Carried Forward (2,418)   
Page 113

Page 114

102
Moray Council Unaudited Annual Account 2022/23
Notes to the Housing Revenue Account 
1. Number and Type of Dwelling House 
The Council dwelling house stock as at 31 March was as follows:- 
2021/22 2022/23
Number of
Dwellings
Number of
Dwellings
Bedsit Houses and Bungalows 20             20            
Flats and Maisonettes 24             24            
1 bedroom Houses and Bungalows 1,079       1,079      
Flats and Maisonettes 711           719          
2 bedroom Houses and Bungalows 2,221       2,222      
Flats and Maisonettes 691           691          
3 bedroom Houses and Bungalows 1,267       1,299      
Flats and Maisonettes 99             99            
4 or more bedroomed Houses and Bungalows 175           179          
Total 6,287       6,332       
2. Rent Arrears 
The total rent arrears, including rents outstanding from former tenants, as at 31 March 2023 was £0.998m which is 4.76%
of gross rental income. This is equivalent to £157.54 per house (2021/22 £0.794m, 3.86%, £126.21). 
3. Impairment of Debtors 
The provision for uncollectable debts has increased by £0.101m (decrease in 2021/22 £0.008m). The total provision for
uncollectable debts including rechargeable repairs is £0.375m (2021/22 £0.274m). 
4. Voids 
The loss of rental on void properties for the year was £0.220m (2021/22 £0.266m). 
Page 114

Page 115

103
Moray Council Unaudited Annual Account 2022/23
Council Tax Income Account 
The Council Tax Income Account (Scotland) shows the gross income raised from Council taxes levied and deductions
made under Statute. The resultant net income is transferred to the Comprehensive Income and Expenditure Statement. 
On 1 April 1993, the Council Tax replaced the Community Charge. It is a property based tax which relates to the capital
value of domestic properties at 1st April 1991, as determined by the Assessor, with each property being placed in a
Valuation Band, between A and H. The Assessor publishes a Valuation List which contains information on each property
and the band to which it has been assigned.  All properties in the Valuation List are liable for Council Tax, but some may
be exempt from payment or may attract a discount depending on whether they are unoccupied, the number of persons in
occupation and/or the status of the person(s) resident. 
2021/22 2022/23
£000 £000
60,143 Council Tax Levied and Contributions in Lieu 62,656
Deduct:
(4,016)  Local Council Tax Reduction Scheme (4,059) 
(8,983)  Other discounts and reductions (9,378) 
47,144 Total for Year 49,219
(54)        Council Tax adjustment in respect of prior years 142      
(1,111)  Allowance for impairment of uncollectable debts (986)     
45,979 Transfers to General Fund 48,375 
Council Tax Levy 
In order to encourage empty home owners to bring their properties back into use to increase the supply of housing in
Scotland, the Scottish Government introduced the Local Government Finance (Unoccupied Properties etc.) (Scotland) Act
2012. This legislation allowed Councils to remove the discount for Council Tax on certain types of unoccupied homes and
to increase the level of Council Tax payable on these properties. 
The new powers came into effect on 1 April 2013 and Moray Council decided to use these new powers to introduce an
additional levy on properties which have been unoccupied for more than twelve months. This additional levy was set at
50% from 1 April 2014 rising to 100% from 1 April 2015. During 2022/23 Moray Council collected £0.5m (2021/22 £0.4m)
from the implementation of this policy. This amount is included in the figures above.   
Page 115

Page 116

104
Moray Council Unaudited Annual Account 2022/23
Council Tax Income Account (continued) 
Calculation of Council Tax Base
Number of Dwellings 
Number of
Dwellings
Number of
Exemptions/
Reliefs 25% Other
Total
Equivalent
Dwellings
Ratio to
Band D
Band D
Equivalent
Band A 11,973     851              1,566       215           9,341        6/9 6,224         
Band B 10,532     543              1,064       194           8,731        7/9 6,791         
Band C 7,173       435              588           140           6,010        8/9 5,342         
Band D 6,712       501              441           99             5,671        9/9 5,671         
Band E 6,490       230              325           92             5,843        473/360 7,677         
Band F 2,464       62                 88             40             2,274        585/360 3,695         
Band G 715           25                 23             20             647            705/360 1,267         
Band H 107           53                 1               4               49              882/360 120            
46,166     2,700           4,096       804           38,566      36,787      
Add: Contributions in Lieu 954            
Less: Provision for non-collection (755)           
Council Tax Base 2022/23 36,986      
Discounts
Calculation of Council Tax 
In 2022/23, the charges for each band were as follows: 
Band Property Value Number of Properties Council Tax Charge
£
A Up to 27,000 9,341                                  £908.37
B 27,000 - 35,000 8,731                                  £1,059.77
C 35,001 - 45,000 6,010                                  £1,211.16
D 45,001 - 58,000 5,671                                  £1,362.56
E 58,001 - 80,000 5,843                                  £1,790.25
F 80,001 - 106,000 2,274                                  £2,214.16
G 106,001 - 212,000 647                                     £2,668.35
H Above 212,000 49                                        £3,338.27 
Page 116

Page 117

105
Moray Council Unaudited Annual Account 2022/23
Non-Domestic Rate Income Account 
The Non-Domestic Rate Account (Scotland) is an agent's statement that reflects the statutory obligation for billing
authorities to maintain a separate Non-Domestic Rate Account. The statement shows the gross income from the rates and
deductions made under statute. The net income is paid to the Scottish Government as a contribution to the national Non-
Domestic Rate pool. 
The occupiers of non-domestic properties are liable to pay rates which are assessed on their property's rateable value.
Each property is assigned a rateable value by the Assessor, which is published in the Valuation Roll. The Non-Domestic
Rate poundage, which is used to calculate the amount of rates payable, is set by Scottish Government Ministers. 
In 2022/23 the rate poundage was 49.8p (49.0p in 2021/22). In 2020/21 the government amended the supplements paid
by properties with a rateable value in excess of £0.051m: for properties with rateable values of £0.051m to £0.095m, an
Intermediate Property Supplement of 1.3p was introduced; properties with rateable values in excess of £0.095m incurred
a Large Property Supplement of 2.6p (these supplements are unchanged from 2021/22). 
Properties with a rateable value of up to £0.018m qualified for a reduction on a sliding scale of between 25% and 100% of
their rates bill under the Small Business Bonus Scheme. 
The rates collected from non-domestic ratepayers during the year are shown below. Any difference between the rates
collected and the amount the Council is guaranteed to receive under the National Pooling arrangements is adjusted via
the General Revenue Grant paid by the Scottish Government to the Council. 
The Scottish Government introduced the Business Rates Incentivisation Scheme (BRIS) from April 2012 to encourage
Local Authorities to maximise their existing business rates income and encourage new business start-up. The Scottish
Government set a target for each Local Authority which can retain 50% of any additional income above the target.  The
BRIS scheme was suspended by Scottish Government for the years 2020/21 and 2021/22 due to the impact of the COVID-
19 pandemic, the last distribution of fund being for growth in 2019/20.  Local authorities are awaiting confirmation from
government of the scheme’s future. 
2021/22 2022/23
£000 £000
61,478   Gross Rates Levied 63,931  
Deduct:
(15,959) Reliefs and Other Deductions (10,201)
-              Payment of interest
-              Write-offs of uncollectable debts and allowance for impairment
45,519   Net Non-Domestic Rate Income 53,730  
(7,935)    Adjsutments to previous years' National Non-Domestic Rates (985)      
37,584   52,745  
(23)         Business Rates Incentivisation Scheme (BRIS) retention -             
3,676     Contribution (to)/from National Pooling 1,830    
41,237   Guaranteed Rate Income 54,575  
23           BRIS retention
41,260   Amount credited to the Comprehensive Income and Expenditure Statement 54,575   
Page 117

Page 118

106
Moray Council Unaudited Annual Account 2022/23
Non-Domestic Rate Income Account (continued) 
Analysis of Rateable Values and Numbers of Entries at 1 April 2022 
Number of
Entries
2022/23
Rateable
Value
£000
Shops 915           19,166    
Public Houses 58             1,089      
Offices (including Banks) 503           5,833      
Hotels, Boarding Houses, etc. 113           3,211      
Industrial and Freight Transport Subjects 1,354       51,057    
Leisure, Entertainment Caravans and Holiday Sites 904           4,229      
Garages and Petrol Stations 123           1,444      
Cultural 19             204          
Sporting Subjects 565           712          
Education and Training 83             7,937      
Public Service Subjects 274           16,529    
Communications (Non-Formula) 17             1,377      
Quarries, Mines, etc. 34             380          
Petrochemical 5               613          
Religious 155           1,205      
Health Medical 51             2,215      
Other 431           697          
Care Facilities 50             1,913      
Advertising 18             33            
Undertaking 22             4,215      
5,694       124,059   
A revaluation of the rateable values of all non-domestic properties was implemented on 1st April 2017. The next will occur
on 1 April 2023. 
Page 118

Page 119

107
Moray Council Unaudited Annual Account 2022/23
Trust Funds 
The Council administers 37 trust funds, acting as sole trustee for 33 trusts and as one of several trustees for a further 4
funds. These accounts do not represent a charge to Council Tax payers but form part of the statutory reporting
requirements of the Council. They represent funds set up by various individuals and organisations for the benefit of the
community or organisations within the Moray area. 
The statements below summarise the trust funds’ income and expenditure for the year and the funds’ assets and liabilities
at 31 March 2023. 
Trust Reorganisation 
The Council recently undertook a review of its trusts, in consultation with the Office of the Scottish Charities Regulator
(OSCR), and restructured its charitable trusts in order to create a smaller number of trusts with improved governance
arrangements and with the opportunity to maximise the use of these resources to the benefit of the citizens of Moray. In
August 2016, The Moray Council Charitable Trust (TMCCT) was awarded charitable status under the Charities and Trustee
Investment (Scotland) Act 2005. The trusts being reorganised into this new single trust will be utilised, as far as possible,
in a manner consistent with the original trust purposes. To date, 24 trusts have been approved by OSCR for reorganisation
into TMCCT and this is reflected in the accounts and notes on the following pages. The process of reorganisation is
ongoing. 
Accounting Policies 
Basis of Preparation
The financial statements for the charitable trusts have been prepared in accordance with the Accounting and Reporting by
Charities: Statement of Recommended Practice 2015, applicable to charities preparing their accounts, in accordance with
the Financial Reporting Standard 102 (FRS 102), applicable for the UK and Republic of Ireland, commonly referred to as
the Charities SORP which is effective for accounting periods beginning on or after 1 January 2015. The financial statements
have been prepared under the historical cost convention as modified by the inclusion of investments at fair value, in
accordance with the Charities and Trustee Investment (Scotland) Act 2005 and the Charities Accounts (Scotland)
Regulations 2006 (as amended). 
In line with Regulation 7 of the 2006 Regulations, these financial statements have been prepared on the basis that the
trust funds for which it acts as sole trustee are connected charities. As such the accounts for these individual charities
have been prepared on a collective basis for the Council. Separate financial statements covering all the Council’s charitable
trusts are published on the Council’s website. 
The financial statements for the non-charitable trusts have been prepared in accordance with the code of practice on Local
Authority Accounting in the United Kingdom 2022/23. 
As far as concerns the trusts reported in these financial statements, application of different reporting standards does not
produce inconsistent results. 
Investment Income
Investment income is accounted for in the period in which the charity is entitled to receipt and the amount can be measured
with reasonable certainty. 
Resources expended
Expenditure is included in the financial statements on an accruals basis. 
Investments
Investments are included at fair value at the balance sheet date in accordance with the principles of the SORP. Investment
gains and losses include any gain or loss on the sale of investments and any gain or loss resulting from revaluing
investments to fair value at the end of the period. 
Page 119

Page 120

108
Moray Council Unaudited Annual Account 2022/23
Trust Funds Income and Expenditure Account 
Connected
Charitable Other
Connected
Charitable Other
£000 £000 £000 £000
Income
(24)                 (102)  Investment Income (28)               (116)    
-                     (50)     Property Rental Income -                   (57)      
-                     (212)  Gain on Revaluation of Fixed Assets -                   (1,337)
(42)                 (174)  (Surplus)/Deficit on revaluation of Available for Sale Financial Assets 15                66       
-                     (2)       Other Income -                   (2)        
(66)                 (540)  Total Income (13)               (1,446)
Expenditure
11                  62      Beneficiaries 15                70       
6                    8        Administration 8                  10       
-                     42      Other Costs -                   165     
-                     130    Depreciation -                   130     
17                  242    Total Expenditure 23                375     
(49)                 (298)  (Surplus)/Deficit for the year 10                (1,071)
42                  256    Items not Chargeable to Revenue Reserves (15)               1,141  
(7)                   (42)     (Increase)/Decrease in Revenue Reserves (5)                 70       
2021/22 2022/23
Page 120

Page 121

109
Moray Council Unaudited Annual Account 2022/23
Trust Funds Balance Sheet 
Connected
Charitable Other
Connected
Charitable Other
£000 £000 £000 £000
-                     5,130        Property, Plant and Equipment Note 1 -                     6,317       
-                     80             Investment Properties Note 3 -                     100          
599               2,480        Long Term Investments Note 4 584               2,414       
599               7,690        Long Term Assets 584               8,831       
1                    5                Debtors 2                    8               
433               1,836        Loans Fund Balance 437               1,759       
434               1,841        Current Assets 439               1,767       
(7)                  (18)            Creditors (7)                  (14)           
(7)                  (18)            Current Liabilities (7)                  (14)           
1,026            9,513        Net Assets 1,016            10,584    
-                     3,242        Capital Adjustment Account -                     3,242       
-                     1,944        Revaluation Reserve -                     3,151       
354               1,466        Financial Instruments Adjustment Account 338               1,400       
672               2,861        Revenue Balance 678               2,791       
1,026            9,513        Total Reserves 1,016            10,584    
2021/22 2022/23
Page 121

Page 122

110
Moray Council Unaudited Annual Account 2022/23
Notes to the Trust Fund Accounts 
Note 1 Property, Plant and Equipment 
Property, plant and equipment is valued on the basis recommended by CIPFA and the valuation report is produced by the
Council's Estates Manager who is a Member of the Royal Institute of Chartered Surveyors. The assets are valued on a 5
year rolling programme and have been prepared in accordance with the provisions of the Royal Institution of Chartered
Surveyors Valuation - Professional Standards January 2014. 
Property, plant and equipment is classified into groupings required by the Code of Practice on Local Authority Accounting
in the United Kingdom 2022/23. 
Assets have been valued on the following basis:- 
Other Land and Buildings - Existing Use Value (EUV) or Depreciated Replacement Cost (DRC)
Community Assets - Historic Cost where available   
Depreciation:  
The following useful lives and depreciation rates have been used in the calculation of depreciation:-   
Other Land and Buildings - Buildings up to 55 years, land is not depreciated
Community Assets - Rights and land are not depreciated 
Movements of property, plant and equipment were as follows: 
2021/22
Other Land and
Buildings
Community
Assets Total
£000 £000 £000
Gross Book Value at 1 April 2021 5,389                  15                5,404     
Revaluations 127                      -                    127        
Gross Book Value at 31 March 2022 5,516                  15                5,531     
Accumulated Depreciation at 1 April 2021 356                      -                    356        
Revaluations (85)                       -                    (85)         
Charge for the Year 130                      -                    130        
Depreciation at 31 March 2022 401                      -                    401        
Net Book Value at 31 March 2022 5,115                  15                5,130     
2022/23
Other Land and
Buildings
Community
Assets Total
£000 £000 £000
Gross Book Value at 1 April 2022 5,516                  15                5,531     
Revaluations 786                      786        
Gross Book Value at 31 March 2023 6,302                  15                6,317     
Accumulated Depreciation at 1 April 2022 401                      -                    401        
Revaluations (531)                    (531)       
Charge for the Year 130                      130        
Depreciation at 31 March 2023 -                           -                    -               
Page 122

Page 123

111
Moray Council Unaudited Annual Account 2022/23
Note 2 Heritage Assets 
The following table shows assets which may be regarded as Heritage assets, but which have not been included in the
Balance Sheet as the Council considers that obtaining valuations would involve disproportionate cost and that reliable cost
or valuation information cannot be obtained for these items.  The Code therefore permits such assets to be excluded from
the Balance Sheet. 
Assets Excluded from Heritage Assets
Estimated
number of
assets 31
March
2023
Monuments and Fountains 2
Note 3 Investment Properties 
The following table summarises the movement in the fair value of investment properties over the year. 
2021/22 2022/23
£000 £000
Balance at start of the year 80             80            
Net gains/(losses) from fair value adjustments -                20            
Balance at end of the year 80             100           
Page 123

Page 124

112
Moray Council Unaudited Annual Account 2022/23
Note 4 Trust Details 
Funds for which The Moray Council act as Sole Trustee 
Fund Income Expenditure Assets Liabilities
£000 £000 £000 £000
Registered Charitable Trusts
6 Registered Charitable Trusts, each with
Assets less than £50,000 (1) 1 57             (1)
The Moray Council Charitable Trust (5) 20 709           (5)
Established to reorganise trusts with out of
date purposes. 23 trusts were approved for
reorganisation in 2021/22.Split into sub
categories by location and purpose.
Moray & Nairn Educational (6) 1                     257           (1)
Grants payable to persons resident in the
former combined County of Moray & Nairn,
including University & Central Institution
Bursaries; Adult Education; School
Equipment; Sports facilities; Travel Grants
and School Excursions
(12) 22                   1,023       (7)
Other Trusts
6 Non Registered Trusts, each with Assets
less than £50,000 (1) 1                     85             -
Longmore Hall (399) 31 1,428 -
Village Hall for the use of the community
Glenisla Comforts Fund (2) -                      171           -
For the benefit of the residents of Glenisla
Care Home
John Pringle Bequest - -                      54             -
For the benefit of students at Aberdeen
University who have previously attended
Elgin Academy
Speyside Comforts Fund - -                      76             -
For the benefit of the residents of Speyside
Nursing Home
The Pringle Trust (3) 2                     104           -
Established to make payments annually to
Ministers, serving and emeriti of the Church
of Scotland, Baptist and Free Church of
Scotland 
Page 124

Page 125

113
Moray Council Unaudited Annual Account 2022/23
Note 4 Trust Details (continued) 
Fund Income Expenditure Assets Liabilities
£000 £000 £000 £000
William Lawtie (23) - 225           -
For the Poor of Cullen
The MacDonald Benevolent Fund (5) 8                    296           -
Established in 1989 for persons in need of
financial assistance particularly in Dufftown as
decided by the Social Work Department
Milne's Institution Trust (2) 8                    309           -
The free annual income to be applied as The
Moray Council thinks fit for the purposes of the
educational enrichment of pupils attending
Milne's High School and Milne's Primary School.
The income shall be apportioned to the schools
on a pro rata basis by reference to attendance
rolls of the respective schools
Laing Mortification
For the benefit of a decayed merchant resident
in Elgin. (7) -                     322           -
Craigmoray Bequest (Bishopmill)
For the benefit of the residents of Craigmoray
Care Home (6) -                     484           -
Ladyhill Public Trust (15) 10                  116           (1)
Provides homes for two veterans from the Elgin
area
Jubilee Cottages Public Trust (72) 16                  712           -
Trust established by monies raised during
Queen Victoria's Diamond Jubilee for the
purposes of providing low cost housing
Cooper Park Public Trust (155) 44                  503          
Trust established at turn of last century to provide
Elgin library and reading rooms and parkland for
recreation – all for the inhabitants of Elgin
-
River Lossie Public Trust (127) 149               1,003       -
Established mid 1800’s to provide ground for
recreation for the people of Elgin
Grant Park Public Trust (319) 28                  1,256       -
Trust incorporating the public convenience, tea
room/shop and the cricket and bowling
pavilions, to be used for the benefit of the
community of Forres
Miltonduff Hall (138) 8                    488           -
Established to provide space for local groups for
education, recreation etc 
Page 125

Page 126

114
Moray Council Unaudited Annual Account 2022/23
Note 4 Trust Details (continued) 
Fund Income Expenditure Assets Liabilities
£000 £000 £000 £000
Logie Cottage (2) 3                   87             -
Proceeds from the sale of Logie cottage which was
previously established to provide a free home or house of
rest to a respectable retired couple or single woman in
Fife Park, Keith Public Trust - 49                 -                -
Trust incorporating the playing field, pavilion and public
convenience
Flemming Hall Aberlour (200) 13                 764           -
(1,476) 370 8,483 (1)
Funds for which The Moray Council acts as one of several trustees
Registered Charitable Trusts
Auchernack Trust (7) 11                 847 (1)
For the benefit of the elderly community of the Forres Area
who are in need of relief by reason of advanced age
(7) 11 847 (1)
Other Trusts
Donald Manson (Edinkillie) Fund (3) 10                 384           (10)
3 Bursaries for children living in the Parish of Edinkillie in
S1 as well as one Further Education Bursary for a student
aged under 18.  The annual balance of the fund is payable
Donald Manson (Forres) Fund (1) 3                   105           (2)
One bursary for a child living in the Burgh of Forres in S1.
The annual balance of the fund is payable to Forres
Banffshire Educational Trust (6) 28                 779           -
Grants payable to persons resident in the former County of
Banffshire, including University, Post Graduate,
Apprentices & Trainees; School Equipment; Sports
Facilities; Support of Clubs; Promoting Education in
Drama, Music & Visual Arts; Travel Grants and School
(10) 41                 1,268       (12)
Fund Income   
£000
Expenditure   
£000
Assets   
£000
Liabilities   
£000
Summary
Connected Charitable Trusts (12) 22 1,023 (7)
Other Trusts (1,493) 422 10,598 (14)
Total (1,505) 444 11,621 (21)
Page 126

Page 127

115
Moray Council Unaudited Annual Account 2022/23
Common Good Funds 
The Council administers the Common Good Funds which consist of all property of a Burgh not acquired under statutory
powers or held under specific trusts. These funds were transferred to Moray District Council in 1975 and then to The Moray
Council in 1996 as the successor Council under the reorganisation of local government. 
These funds do not represent a charge to Council Tax payers but form part of the statutory reporting requirements of the
Council. They represent funds set up for the benefit of the community or organisations within the Moray area. 
The Accounts for Common Good have been prepared according to the LAASAC Guidance Accounting for Common Good
(December 2007) which is consistent with proper accounting required by the Code of Practice on Local Authority
Accounting in the United Kingdom 2022/23. 
Accounting Policies 
Accounting Policies adopted for the Common Good are the same as those adopted for the Moray Council with the
exception of the application of IAS 16 and IAS 40. IAS 16 requires that assets be depreciated and that the charge for
depreciation be set against any surplus in the Income and Expenditure Account. IAS 40 requires any movement in the fair
value of investment properties to be recognised in the surplus or deficit in the Income and Expenditure Account. 
Common Good Funds Income and Expenditure Account 
31 March 2022 31 March 2022 31 March 2023
Restated
£000 £000 £000
Income
(7)                       (7)                       Property (6)                      
(142)                   (142)                   Investment Income (143)                  
(8)                       (8)                       Other Income (1)                      
(5)                       (5)                       Gain on Disposal of Asset
(162)                   (162)                   Total Income (150)                  
Expenditure
2                         2                         Property Costs 4                        
7                         7                         Administrative Costs 8                        
33                      33                      Donations, Grants etc 92                     
29                      29                      Other Costs 20                     
564                    1                         Depreciation Note 1 650                   
-                          -                          Loss on Disposal of Asset 646                   
40                      (271)                   Net Movement in Fair Value of Investment Property 34                     
675                    (199)                   Total Expenditure 1,454                
513                    (361)                   (Surplus)/Deficit for the Year 1,304                
159                    (2,774)               Deficit/(Surplus) on revaluation of Non-current Assets (670)                  
672                    (3,135)               Total Comprehensive Net Expenditure 634                   
Page 127

Page 128

116
Moray Council Unaudited Annual Account 2022/23
Common Good Funds Balance Sheet 
31 March 2022 31 March 2022 31 March 2023
Restated
£000 £000 £000
13,710              17,205              Property, Plant & Equipment Note 1 16,519             
204                    204                    Heritage Assets Note 2 204                   
2,294                 2,605                 Investment Property Note 3 2,571                
16,208              20,014              Long Term Assets 19,294             
1                         1                         Inventories 1                        
8                         8                         Debtors 8                        
3,896                 3,896                 Loans Fund Balance 3,982                
3,905                 3,905                 Current Assets 3,991                
(6)                       (6)                       Creditors (6)                      
(6)                       (6)                       Current Liabilities (6)                      
20,107              23,913              Net Assets 23,279             
13,904              17,399              Revaluation Reserve 16,713             
6,203                 6,514                 Revenue Reserve 6,566                
20,107              23,913              Total Reserves 23,279             
31 March 2022 31 March 2022
Restated
Total Funds Total Funds
Invested in
Loans Fund Total Funds
£000 £000 £000 £000
4,058                 4,605                 Buckie 1,633                5,069         
193                    193                    Cullen 180                    197            
15                      15                      Dufftown 15                      15               
10,515              12,606              Elgin 1,614                13,251       
3,197                 3,972                 Forres 471                    2,450         
52                      52                      Portknockie 53                      53               
298                    353                    Keith 12                      358            
1,257                 1,483                 Lossiemouth -                         1,882         
522                    634                    Findochty 4                        4                 
20,107              23,913              TOTAL 3,982                23,279       
31 March 2023
Page 128

Page 129

117
Moray Council Unaudited Annual Account 2022/23
Notes to the Common Good Accounts 
Note 1 Property, Plant and Equipment 
Property, plant and equipment is valued on the basis recommended by CIPFA and the valuation report is produced by the
Council's Estates Manager who is a Member of the Royal Institute of Chartered Surveyors. The assets are valued on a 5
year rolling programme and have been prepared in accordance with the provisions of the Royal Institution of Chartered
Surveyors Valuation - Professional Standards January 2014. Property, plant and equipment is classified into groupings
required by the Code of Practice on Local Authority Accounting in the United Kingdom 2022/23. 
A copy of the asset register can be found at https://data-moray.opendata.arcgis.com: 
Assets have been valued on the following basis:- 
Other Land and Buildings - Existing Use Value (EUV) or Depreciated Replacement Cost (DRC)
Community Assets - Historic Cost where available
Surplus Assets - Market value
Assets Held for Sale - Lower of carrying amount and fair value less costs to sell 
Depreciation
The following useful lives and depreciation rates have been used in the calculation of depreciation:- 
Other Land and Buildings - Buildings up to 60 years, land is not depreciated
Surplus Assets - land is not depreciated 
Movements of Property Plant and Equipment were as follows: 
2021/22
Other Land & Surplus Assets Held Total
Buildings Assets For Sale
£000 £000 £000 £000
Gross Book Value at  1 April 2021 15,268           -            122              15,390
Revaluations 44                   (214)     -                    (170)     
Reclassifications (271)               271      -                    -            
Disposals -                      -            (122)             (122)     
Gross Book Value at 31 March 2022 15,041           57         -                    15,098
Accumulated Depreciation at 1 April 2021 835                 -            -                    835      
Revaluations (4)                    (7)          -                    (11)       
Reclassifications (7)                    7           -                    -            
Charge for the Year 564                 -            -                    564      
Depreciation at 31 March 2022 1,388             -            -                    1,388   
Net Book Value at 31 March 2022 13,653           57         -                    13,710 
Page 129

Page 130

118
Moray Council Unaudited Annual Account 2022/23
Note 1 Property, Plant and Equipment (continued) 
2021/22 Restated
Other Land & Surplus Assets Held Total
Buildings Assets For Sale
£000 £000 £000 £000
Gross Book Value at  1 April 2021 15,268           -            122              15,390
Revaluations 44                   (214)     -                    (170)     
Indexation 2,109             -            -                    2,109   
Reclassifications (271)               271      -                    -            
Disposals -                      -            (122)             (122)     
Gross Book Value at 31 March 2022 17,150           57         -                    17,207
Accumulated Depreciation at 1 April 2021 835                 -            -                    835      
Revaluations (4)                    (7)          -                    (11)       
Indexation (823)               -            -                    (823)     
Reclassifications (7)                    7           -                    -            
Charge for the Year 1                     -            -                    1           
Depreciation at 31 March 2022 2                     -            -                    2           
Net Book Value at 31 March 2022 17,148           57         -                    17,205
2022/23
Other Land & Surplus Assets Held Total
Buildings Assets For Sale
£000 £000 £000 £000
Gross Book Value at  1 April 2022 17,150           57         -                    17,207
Revaluations (779)               -            -                    (779)     
Indexation 796                 -            -                    796      
Reclassifications (17)                  (57)       74                 -            
Disposals (631)               -            (74)               (705)     
Gross Book Value at 31 March 2023 16,519           -            -                    16,519
Accumulated Depreciation at 1 April 2022 2                     -            -                    2           
Revaluations (105)               -            -                    (105)     
Indexation (547)               -            -                    (547)     
Charge for the Year 650                 -            -                    650      
Depreciation at 31 March 2023 -                      -            -                    -            
Net Book Value at 31 March 2023 16,519           -            -                    16,519 
Revaluations (2021/22 and 2022/23) include assets previously held on the General Services Account now identified as
Common Good. 
Page 130

Page 131

119
Moray Council Unaudited Annual Account 2022/23
Note 2 Heritage Assets 
This note details the movement in Heritage Assets during the years 2021/22 and 2022/23. 
Fine Chains of Total
Art Office Heritage
Assets
£000 £000 £000
Valuation at  1 April 2021 125 79 204
Revaluations - - -
At 31 March 2022 125 79 204
Valuation at 1 April 2022 125 79 204
Revaluations - - -
At 31 March 2023 125 79 204 
The Chains of Office were independently valued during 2012/13 and 2013/14 by William Windwick, PJDip FGA FNAG
MIRV, a member of the Institute of Registered Valuers. 
The following table shows assets that may be regarded as Heritage Assets, but which have not been included in the
Balance Sheet as the Council considers that obtaining valuations would involve disproportionate cost and that reliable cost
or valuation information cannot be obtained for these items. The Code therefore permits such assets to be excluded from
the Balance Sheet. 
Assets excluded from Heritage Assets
Estimated
number of
assets 31
March 2023
Monuments and Fountains 2
Nelson Tower 1
Note 3 Investment Property 
The following items of income and expense have been accounted for in Investment Income in the Income and Expenditure
Account:- 
2021/22 2021/22 2022/23
Restated
£000 £000 £000
Rental income from investment property 63         63           52        
Net gain 63         63           52         
There are some restrictions from the original benefactors on the Common Good’s ability to realise the value inherent in its
investment property. The Common Good has no contractual obligations to purchase, construct or develop investment
property or for repairs, maintenance or enhancement. 
Page 131

Page 132

120
Moray Council Unaudited Annual Account 2022/23
Note 3 Investment Property 
The following table summarises the movement in the fair value of investment properties over the year: 
2021/22 2021/22 2022/23
Restated
£000 £000 £000
Balance at start of the year 2,334 2,334 2,605
Net gains /(loss) from fair value adjustments (40) 271 (34)
Balance at end of the year 2,294 2,605 2,571 
Page 132

Page 133

121
Moray Council Unaudited Annual Account 2022/23 
Glossary of Terms 
Capital Expenditure
This is expenditure incurred in creating, acquiring or improving assets. The expenditure is normally financed by borrowing
over a period of years, or utilising the income from the sale of existing assets. 
CIPFA
Chartered Institute of Public Finance and Accountancy 
Current value
For operational land and buildings, current value is the amount that would be paid for the asset in its existing use. 
Economic Cost
The total cost of performing an activity or following a decision or course of action. 
Fair Value
The price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market
participants at the measurement date. 
IFRS
International Financial Reporting Standard 
LASAAC
Local Authority (Scotland) Accounts Advisory Committee 
Public Works Loan Board (PWLB)
A Government Agency which provides loans to the Council. 
Revenue Expenditure
This is expenditure incurred in providing services in the current year and which benefits that year only. 
SeRCOP 
Service Reporting Code of Practice 
The Code
The Code of Practice on Local Authority Accounting in the United Kingdom 
Sources of Additional Information 
The Annual Accounts is one of several documents published by Moray Council and CIPFA giving financial information on
the services provided in the Moray Area. Other annual publications are: - 
• The Capital and Revenue Budget, published on the Council’s website giving detailed expenditure plans for
the following financial year.
• Council Tax Information Leaflets (forming Part 2 of the Council Tax Demand Notice) issued by the Council
giving a summary of expenditure plans for the following year.
• Rating Review published by the Scottish Branch of CIPFA giving comparative statistics for all Scottish Local
Authorities on local authority expenditure and service provision. 
Page 133

Page 134

122
Moray Council Unaudited Annual Account 2022/23 
Page 134