Moray Council 
Wednesday, 22 May 2024 
NOTICE IS HEREBY GIVEN that a Meeting of the Moray Council is to be held at
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Wednesday,
22 May 2024 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 10 and 11 of
business on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4. Minutes 
4a. Minutes of Special Moray Council on 28 February 2024 7 - 18
4b. Minutes of Meeting of Moray Council on 6 March 2024 19 - 30
4c. Minutes of Special Moray Council on 27 March 2024 31 - 36
4d. Minutes of Special Moray Council on 24 April 2024 37 - 44
5. Written Questions ** 
6. Moray Integration Joint Board Summary Report
Report by Chief Officer, Health and Social Care Moray  
45 - 58
Page 1

Page 2

7. Recruitment and Selection Process for a Chief Social
Work Officer
Report by Interim Chief Executive and Chief Executive  
59 - 62
8. Learning Estate Programme Update - Future Forres
Academy Site Selection
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
63 -
184
9. Information Reports - if called in 
Item(s) which the Council may wish to consider with the
Press and Public excluded   
10. Land Assembly - Moray Growth Deal [Para 9]
• 9. Information on terms proposed or to be proposed by or to the
Authority; 
11. Refugee Resettlement and Assylum Activities [Para 3
and 5]
• 3. Information relating to any particular applicant for, or recipient or
former recipient of, any service provided by the Authority;
• 5. Information relating to the adoption, care, fostering or education
of any particular child or relating to the supervision or residence of
any particular child in accordance with a supervision requirement; 
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought. 
Information Report - Moray Growth Deal Annual Report
Report by Depute Chief Executive (Economy, Environment and
Finance)  
185 -
250
Page 2

Page 3

Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
Page 4

Page 5

MORAY COUNCIL 
Moray Council 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Donald Gatt  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Peter Bloomfield  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Neil McLennan  (Member)
Councillor Shona Morrison  (Member)
Councillor Bridget Mustard  (Member)
Councillor Derek Ross  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk van der Horn  (Member)
Councillor Sonya Warren  (Member)
Councillor Ben Williams  (Member)  
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Special Meeting of the Moray Council 
Wednesday, 28 February 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Tracy Colyer,
Councillor Theresa Coull, Councillor John Cowe, Councillor John Divers, Councillor
Amber Dunbar, Councillor Jérémie Fernandes, Councillor Donald Gatt, Councillor
David Gordon, Councillor Juli Harris, Councillor Sandy Keith, Councillor Scott
Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor Paul
McBain, Councillor Neil McLennan, Councillor Shona Morrison, Councillor Bridget
Mustard, Councillor Kathleen Robertson, Councillor Derek Ross, Councillor John
Stuart, Councillor Draeyk van der Horn, Councillor Sonya Warren, Councillor Ben
Williams 
APOLOGIES 
Councillor Neil Cameron 
IN ATTENDANCE 
The Chief Executive, Depute Chief Executive (Economy, Environment and Finance),
Depute Chief Executive (Education, Communities and Organisational Development),
Head of Governance, Strategy and Performance, Chief Financial Officer, Head of
Housing and Property, Head of HR, ICT and Organisational Development, Head of
Environmental and Commercial Services and Democratic Services Manager.   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 and The Councillors' Code of conduct the
Council noted the following declarations and group interest in respect of the 2024/25
Budget from the Conservative, SNP, Labour and Green Councillors.  
For transparency Councillor Williams declared a connection in terms of Item 6 on the
agenda, however following advice from the Monitoring Officer, advised he would
remain in the meeting.  
There were no other declarations for Group Leaders or Spokesperson in regard to
any prior decisions taken on how members will vote on any item on the agenda or
any declarations of Member's interests in respect of any item on the agenda.
3.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media representatives
Item 4a.
Page 7

Page 8

be excluded from the meeting for Items 17 - 19 of business on the grounds that it
involves the likely disclosure of exempt information of the class.  
Para number of the minute Para Number of Schedule 7a
6 Para 1
Information in relation to staffing matters 
4.         Corporate Plan Progress Update 2022-2023 
The Chair advised that consideration of this item and item 4a Corporate Plan would
be considered together.  
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing Council of progress made
during 2022-23 on the 2019-24 Corporate Plan.  
Following consideration, the Council noted the progress made during 2022-23 on the
Corporate Plan 2019-24 as set out in Appendix 1.  
5.         Corporate Plan 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Council to note the
outcome of the engagement activity on the draft high level priorities for the Council
Corporate Plan for 2024 to 2029 and to agree Council’s Corporate plan 2024-29
setting out the priorities and high level actions.  
Prior to the meeting, Councillors were provided with proposed amendments to the
Corporate Plan from Councillor van der Horn.  
The Chair confirmed that authority had been given to herself and the Chief Executive
at the meeting of Moray Council on 23 August 2023 to agree any amendments to the
wording of the plan and confirmed that she was happy to accept the proposed
changes to the updated version of the corrected plan as follows:  
Page 2 - Community should read Community and Environment
Page 3 - additional bullet point should read - effects of climate change on our
environment and communities.
Page 7 - change Council adapts to the changing climate and acts sustainably to read
Council adapts and acts to the impacts of climate change.  
Councillor Morrison stated that she was happy to see the inclusion of the Gender Pay
Gap being included and sought clarification on whether it should be included as part
of the challenges being faced under the Tackle Poverty and Inequality Priority to
ensure that the Council continue to raise the profile of a significant issue in Moray.  
In response, the Head of Governance, Strategy and Performance confirmed that it
was within the gift of the Councillors decision at the meeting and would include a
paragraph under challenges on the Gender Pay Gap as it is set in the context for the
plan and Officers will work on an outcome indicator to allow regular reporting on the
challenge.  
Page 8

Page 9

Following further consideration the Council unanimously agreed, subject to the
amendments previously discussed, to:  
i) review the outcome of the outcome of the public consultation on the draft 2024-
29 Corporate Plan priorities;    
ii) the Council's Corporate Plan 2024-29 as set out in Appendix 1 and the
approach to delivery and performance management through service and
strategic plans;    
iii) note that a final version of the Corporate Plan 2024-29 will be published online;    
iv) recognise the potential for an integrated single Moray plan to deliver a shared
ambition with Community Planning Partners and agrees to enter into
discussions with Community Planning Partners to explore this as a future
option.      
6.         Short to Medium Term Financial Planning [Para 1] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking Council to approve proposed savings, subject to
consultation where appropriate, for implementation in 2024/25 and 2025/26, in
accordance with the Council's Short to Medium Term Financial Strategy.  
Following consideration the Council unanimously agreed:  
i) to note the savings options set out in Appendix 1, having due regard to the
Integrated Equalities Assessments linked to the appendix;    
ii)  the greatest level of savings possible, subject to Stage 2 public
communications as indicated in Appendix 1 and/or workforce consultation as
required; and    
iii) the proposed amendment to the Council's Change Management Policy and
Procedures as set out in paragraph 6.7 of this report. 
7.         2024-25 Budget 2024-27 Financial Plan 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Council to set the level of Council Tax for
2024/25, to agree the Council’s revenue budget for 2024/25 and to consider the
Council’s Financial Plan for 2024 to 2027.  
Councillor Robertson said that she was pleased and privileged to present her second
budget as Leader of the Administration Group. Before going into the details of the
budget, she thanked the Officers for their support in preparing the budgets. She
thanked Mrs Gunn and Mrs Paisey, in particular, who had overall responsibility for
preparing the budget. She further thanked Heads of Service who worked hard to
provide detail against their budget areas. Additionally, she went on to thank the
Elected Members who worked in line with the Budget Protocol and participated in
Budget Development meetings. Lastly, she thanked Mr Burns who supported
Members throughout this process to get to the current stage and in particular to
Page 9

Page 10

acknowledge his contribution to this and all previous years as this would be his last
budget as Chief Executive. 
Councillor Robertson was pleased to say that there had been a continued collegiate
approach to the budget setting and financial processes. During the past year, both
Elected Members and Officers had been engaged behind the scenes discussing
budget savings options and transformation of services. These discussions were
robust and productive as could be seen in the political agreement that has been
reached in the majority of the budget savings and in the overall approach to balancing
the Council’s budget. She personally thanked Councillors Leadbitter, Morrison, Keith
and van der Horn for their insightful suggestions and beneficial discussions which she
believed would enable all 26 Elected Members to agree the budget submitted for
approval in 2024-25. 
Councillor Robertson continued, overall the Council’s settlement was for one year
only, but the Council intended setting its 2024-25 budget in the context of longer term
planning. It was recognised that continued reduction in real term funding seems
inevitable given other Scottish Government commitment and generally downbeat
forecasts of the Scottish Economy. It needed to be acknowledged that without
significant increases in core funding the financial outlook for Scottish local authorities
appears bleak. 
The Council’s revenue budget comprised of a mix of complex funding streams for
new and existing burdens on the Council. The details are contained in the report. In
particular, she highlighted a new burden which the Council is required to deliver
against, and which is associated with the grant settlement. This burden was the
extension of universal free school meals. Over the next year Officers will be keeping
a close eye on spend against potential further burdens to ensure that spend is kept
as much as possible within the funding allocation. 
In relation to the Capital Plan, it was noted that the plan had been reviewed in light of
increasing costs and changes in requirements. The fundamental objective of
affordability supports our delivery of the capital plan. Continued discussion around
our capital projects going forward will be needed over the coming year to ensure it
remains within sustainable limits.    
With the approval in the previous paper of the further savings from the ‘greens and
ambers’, the Council have gone some way into addressing the budget deficit.
Additionally, the Council must not forget that these savings are in addition to previous
savings agreed this year of £7.5M.  
Councillor Robertson highlighted some real successes over the past year including
the redesign of the Additional Support Needs service which aimed to bring the budget
back into line and gave a clear vision for the service. This would be the same with the
ELC budget including the decision made by Council on the sustainable rate. In
addition to these service changes, a new approach to setting Council charges and
taxes to maximise the Council’s income was reviewed and Council reviewed and
introduced additional taxes such as the Council tax levy on second homes and fit life
visitor membership which should bring in an estimated additional £2.2M. The Council
must also not forget the additional funding Moray received to support economic
growth by securing £18m from the Levelling Up Fund, £20m for Town Centre
redevelopment and of course the ongoing Moray Growth Deal. All together Moray has
secured £138m investment to develop Moray’s economic infrastructure over the
coming decade. 
Page 10

Page 11

Councillor Robertson drew Member’s attention to the budget pressures amounting to
over £4m, plus the budget pressure to cover the Moray Integration Joint Board.
These pressures require monitoring over the next year to ensure that the Council is
managing its budget within limits including the active engagement with the Integration
Joint Board to ensure that the overspend is brought back in line with budget
allocations.  
To be in keeping with the hierarchal approach to budget setting, the Council had
already agreed in January to increases in charges, where appropriate. 
Income from Council tax receipts is the other main source of income for the Council.
While the recommendation is to accept the Council tax freeze it should be
acknowledged that the promise of it being fully funded is not wholly correct. In fact,
the Council is potentially £1M worse off as a result. Nonetheless it was felt to be in
the best interests of Moray residents to not increase their financial burden at this time
with a 10% increase in Council tax which would have been needed if the freeze was
not accepted. Following the publication of the budget it was learnt that Councils would
be given more revenue budget, but it will be dependent on outcomes of both the UK
and Scottish budgets, so it was acknowledged that there were no guarantees.  
The next stage in the hierarchal approach was spend to save. The renaming Council
priority reserve as workforce planning allows the Council to not only ensure there is
budget to cope with workforce policy, it will use some reserves to finance a
management restructure with leadership development, with the intent that some
savings will be harvested from the review.  
Savings identified over the year were £3m. These savings had been agreed over the
year in discussion with both Officers and Members. Robust discussions had created a
unique approach to the budget setting in that, all major parties had come together to
agree savings and areas of priority for the coming year such as supporting the
communities with an increase in youth workers and community wardens. In addition
through the cross-party agreement, there was consensus against reduction in
essential services that support vulnerable people such as the funding to the Citizens
Advice Bureau and an increase in the welfare fund of an additional £40k from the
Council’s budget to meet demand against the Scottish Government grant which is not
sufficient to cover the needs from the Council’s residents. Further Officers are looking
towards our environment by reducing the amount of glyphosate used by the Council
in grounds maintenance and a commitment to position some spend within the Just
Transition fund towards climate change initiatives.  
The use of the Covid reserves will assist the Council to balance its budget for 2024-
25 in addition to the savings identified. While only minor savings from small scale
transformation were envisaged for this year, Members were in agreement that in
2024-25 the Council will focus on investing in transforming and innovation of service
delivery and meet the objective of linking the medium to long term financial strategy
by 2025-26. To do this Members recognise that the Council must clearly identify the
use of funds to enable transformation and innovation of services to take place.  
Reviewing the other reserves which the Council has it had been agreed to reallocate
some of these reserves to support transformation and innovation by adding £1.5m to
the transformation reserves. Further the Council’s focus will be on undertaking a
management restructure to ensure the Council is focusing on its priorities by
reviewing staffing and capacity and supporting leadership development by allocating
of £3.1m to workforce planning which will include expenditure on enacting workforce
policy. Lastly, the Council are determined that members, collectively, will create a
Page 11

Page 12

sustainable Council and to ensure this an additional £1m from earmarked reserves
will be transferred into the general reserves to provide the Council with a cushion
should any emergency arise. This will put the Council on a path of transformation,
innovation and sustainability. 
Unfortunately, the savings and reserves used to balance the budget for 2024-25 do
not preclude the need for more savings to be made in 2025-26. Councillor Robertson
confirmed that she will be working hard over the year with her fellow members and
officers to transform the approach to budget savings through exploring innovative
approaches to services which not only balance the budget but delivers better services
to Moray’s communities. As has been shown in the past year, the collegiate approach
to setting this budget will ensure that all voices are heard in the chamber and
throughout the organisation.  
With the collegiate approach in mind, Councillor Robertson confirmed that she was
pleased to recommend the budget to Council subject to the changes intimated which
included updates provided by the Chief Financial Officer to Items 5 and 6, and with
particular pleasure, subject to adjustments to the budget proposals as set out in the
Cross Party Proposals, the net effect of which was to produce a total core budget
increase of £330k against a core budget decrease of £399k, with additional spend
from the Transformation Reserve of £30k as set out in the explanatory note which
had been circulated to members earlier and detailed below: 
Notification of two updates to Item 6 report as printed by the report author: 
• Amend service description in Appendix 4 to item 6 and Appendix 1 to item 5
for savings number 2 and 3 to Development Management and Building
Standards respectively 
• In Appendix 3 to item 6, add at the foot of the section headed “Options to
Bridge the Gap” the following: “SG additional funding (conditional on Council
Tax Freeze and UK Government Spring Budget) - £1m with total shown as
£3.5m” 
Separately, notification on behalf of the Administration Group: 
Cross Party Budget Proposals (Conservative, SNP, Labour and Green)
recommendations as set out in Item 6, amended as follows: 
• Adopt the proposals in the amendment in full, subject to the budget equivalent to
8 x Detached Youth Workers being phased as follows: half the budget released
immediately with the remaining budget to be released in 2024/25 when the initial
impact of the first £100k investment has been reviewed and based on a targeted
approach to remaining gaps in youth work agreed by Council. 
• Proposal of the following additional savings: 
▪ A saving of £33k from 2024/25 from saving number 10 in Appendix 4 of
Item 6 
▪ A saving of £48k from 2024/25 from saving number 11 in Appendix 4 of
Item 6
• A saving from 2024/25 of £8k from reduction in the use of glyphosate,
working towards a 100% reduction by the end of 2025 as required by the
currently anticipated date from which use will be banned 
Page 12

Page 13

• Additional funding of £40k to the Scottish Welfare Fund for 2024/25 
• Additional funding of £30k for creation of a Plan for Just Transition for Moray to
support a bid to the North East Just Transition fund for the remaining duration
of that fund, from the Transformation Reserve
The amendments meant that recommendation 2.1 (iii) is amended to read: 
Budgeted expenditure of £278,794,000 for 2024/25 
and Recommendation 2.1 (vii) is amended to read:  
Use of ear-marked reserves totalling £731,000 for transformation, £1,136,000 for
Moray Growth Deal cash flow and of £10,156,000 from covid reserves to
balance the budget. 
Councillor Robertson therefore confirmed that she was delighted to recommend the
budget to Council and moved the recommendations as amended. 
This was seconded by Councillor Gatt.  
In response to the Leader’s budget speech Councillor Leadbitter stated that the SNP
Group recognised that the pragmatic and negotiative approach to the budget has
been a significant and positive change. The SNP Group willingly engaged in the
process with all parties; committing time and energy to find areas of co-operation and
mutual agreement.   There had been similar experiences of minority administration
and it behoved everyone to find a way forward for the benefit of communities across
Moray when the democratic process leaves the political balance in the Council
somewhat tricky.  Whilst there had not been agreement on all areas, red lines from
different groups, including the SNP’s red lines, had been respected and it was
recognised that it was a more positive approach to budget setting. 
He also advised that groups had been able to have conversations and explore ideas
and alternative options, which we welcome.  Notwithstanding the cross-party work
that has happened in Moray, it cannot go unstated that the financial pressures on
public services in Scotland are largely caused by years of austerity budgets by the
UK Conservative Government.  Whilst supporting putting more money in the pockets
of people who are least well off, the continued tax cuts to higher earners by the UK
Government at the expense of the NHS, Social Care, Education, Transport, Policing
and many other public service budgets. 
He said that not only did the Council find itself in Scotland trying to make money go
further every year, the Council are also having to mitigate the impacts of a Cost of
Living crisis and inflation and energy prices that have outstripped most other western
countries.   
In achieving that consensus Councillor Leadbitter took a great deal of positivity from
the fact that the SNP’s amendment had been accepted in full and, likewise, had been
able to support some additional asks of the Administration, of the Labour Party and of
the Green Party. 
There are currently 2 permanent Community Wardens in Moray and the SNP sought
to double that to 4 and got further agreement for investment in budget equivalent to
an additional 8 Youth Workers. 
Page 13

Page 14

These proposals were consistent with the amendment last year and while it was not
supported at that time, the Group are pleased to have achieved that support this time
round. 
He confirmed that he firmly believed that these investments combined will both
supporting young people in a range of different ways, whilst also supporting actions
would help to address an increase in anti-social behaviour - both in residential
settings and in the wider community. 
Councillor Leadbitter added that the Group very much welcomed the decision to
freeze Council Tax, which was fully funded and baselined for next year’s budget. His
understanding was that additional funds released to Councils, combined with the
baselining will now mean that the Council’s budget gap for the next 2 years is likely to
be less than £8million subject to expected additional education funding with less call
on reserves. 
He said that the SNP Group are committed to continue with working cross-party on a
range of issues but will of course continue to highlight the pressure being created by
the UK Government’s continuing squeeze on public finances at the expense of valued
public services. 
As Labour Group Leader Councillor Keith wished to say a few comments about the
proposed budget, local government in general and the context within which the
Council operate.  
He stated that in the meeting held on 1 March, 2023, local government is a force for
good and that the Council deliver many vital services such as roads, schools and
libraries which are valued by Moravians.  The Labour Group put up an amendment
last year which was accepted by the majority of councillors establishing ward
budgets, making a £20,000 donation to the Moray Foodbank and extra money going
into Road Safety Schemes amongst other worthwhile initiatives. 
He said that for the current year the Labour Group put forward the case for three
extra Community Wardens to address anti-social behaviour in the towns and villages
and it is hoped that the extra 2 agreed as part of the all-party agreement would also
be able to extend their focus onto traffic related matters. 
The party have also secured £40,000 to augment the Welfare Fund. Members
received a report last month where Councillors learnt that the Council would only be
providing assistance to the “high most compelling” priority rating. The Group felt that
this could not be right and as a Labour Group they were not prepared to ignore those
most in need.  Councillor Keith thanked the other groups for supporting this measure.  
The Labour Group had also argued behind the scenes in the budget round for the
retention of budgets that benefit the most disadvantaged as would be expected from
Labour Councillors.  
He continued that there is no sugar coating the situation that the Council finds itself
in. The cuts announced since October and being agreed formally at this meeting will
hurt and result in curtailed service provision, fewer resources in classrooms, less
roads maintenance and higher charges – it could be called a tax and axe budget.  
He continued that the Labour Group had tried to participate in the budget process as
the people who elect Councillors would expect. He wanted to pay tribute to the
Council Leader in the way in which she had tried to reach across the chamber. It
Page 14

Page 15

would be fair to say that Members have agreed to disagree on things but that was in
a spirit of trying to seek common ground where possible. In short, Councillors have
compromised for the good of the people of Moray.  
He added that this year had also seen the SNP Group participate more fully in the
process and there was agreement for the coming year for more collegiate working
and welcomed the SNP Group’s new position.  
Finally, he concluded that he would like to commend Officers for their assistance in
the budget process and the support which they had afforded himself in his role as
Labour Group Leader.  
Councillor van der Horn praised the collegiate approach to the budget and as the
singular member of the Scottish Green Party in the Council said he was grateful to all
the Officers for the support they had given him in being able to formulate ideas.  He
further thanked the Climate team in particular and the work they are doing in helping
the Council move forward and adapt to the pressures of climate change.    
He further added that he is looking forward to seeing how the transformation and
innovation evolves within the Council.  
In closing he welcomed the proposal to reduce the use of glyphosate within Moray
which will have far reaching effects on the environment and people of Moray and
using money from the transformation reserves to help access money from the Just
Transition Fund.  
Following the comments from the Group Leaders, the Chair then afforded other
Councillors the opportunity to comment on the proposed budget.  Councillors Cowe
and Ross both provided comments in support of the proposed budget.  
Councillor McLennan, expressed concern regarding the budget but did not submit an
amendment. 
Therefore following further consideration and there being no one otherwise minded
the Council unanimously agreed: 
Page 15

Page 16

i) a Council Tax freeze for 2024/25;    
ii) provision of £9,288,000 for budget pressures as listed in APPENDIX 2;    
iii) budgeted expenditure of £278,794,000 for 2024/25    
iv) indicative budgets for 2025/26 and 2026/27 as set out in APPENDIX 1;    
v) funding of £83,805,000 for Moray Integration Joint Board (MIJB) as set out in
paragraph 6.6; 
vi) transfers from the ear-marked reserve for Council priorities of £1,000,000 into
free general reserve and £1,500,000 into the ear-marked reserve for
transformation of services and renaming the residual amount in the Council
priorities reserve as an ear-marked reserve for workforce planning; and    
vii) use of earmarked reserves totalling £731,000 for transformation, £1,136,000
for Moray Growth Deal cash flow and of £10,156,000 from covid reserves to
balance the budget.    
8.         Housing Revenue Account Annual Budget 2024-25 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) presenting details of the proposed Housing Revenue
Account (HRA) Budget Proposal for 2024-25 for approval.  
As Chair of Housing and Community Safety Committee, Councillor Dunbar moved the
budget for 2024-25.  This was seconded by Councillor Gatt. 
Following consideration the Council unanimously agreed:  
i) to note changes since the Housing Business Plan was reviewed in 2022 and
the proposed review of the business plan in 2024/25, as detailed in section 3;    
ii) to note details of the rent restructure which has been undertaken, as detailed
in Section 4;    
iii) the proposed HRA Budget for 2024/25 (Appendix i) and Housing Investment
Plan (Appendix II), including the level of  HRA reserves in line with the
Housing Reserves Policy as detailed in paragraph 7.13;    
iv) to note the results of consultation with tenants on options for the 2024/25 rent
increase as detailed in section 6;    
v) Council house rents increase of 7.7% for 2024/25    
vi) that garage rents are increased by 7.7% for 2024/25;     
vii) that grass cutting charges are increased by 7.7% for 2024/25;    
viii) provision of £200k for service developments as detailed in paragraph 8.17;
and     
ix) to note the three year projection to 2026-27 at Appendix III.
Page 16

Page 17

9.         Treasury Management Prudential Indicators 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking approval of the Treasury Management Strategy
and Investment Strategy for 2024/25 and to approve the indicators which will be used
to measure the Council's performance in capital investment decisions.  
Following consideration the Council unanimously agreed to:  
i) approve the Treasury Management Strategy Statement for 2024/25;    
ii) approve the Investment Strategy for 2024/25 at Appendix 1;    
iii) approve the Prudential Indicators and Limits for 2024/25 at Appendix 3; and    
iv) note the indicative Prudential Indicators and limits for 2025/26 and 2026/27.     
Page 17

Page 18

Page 18

Page 19

MORAY COUNCIL 
Minute of Meeting of the Moray Council 
Wednesday, 6 March 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Tracy Colyer,
Councillor Theresa Coull, Councillor John Cowe, Councillor John Divers, Councillor
Amber Dunbar, Councillor Jérémie Fernandes, Councillor Donald Gatt, Councillor
David Gordon, Councillor Juli Harris, Councillor Sandy Keith, Councillor Scott
Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor Paul
McBain, Councillor Neil McLennan, Councillor Shona Morrison, Councillor Bridget
Mustard, Councillor Kathleen Robertson, Councillor Derek Ross, Councillor John
Stuart, Councillor Draeyk van der Horn, Councillor Sonya Warren, Councillor Ben
Williams 
APOLOGIES 
Councillor Neil Cameron 
IN ATTENDANCE 
Chief Executive, Depute Chief Executive (Economy, Environment and Finance),
Depute Chief Executive (Education, Communities and Organisational
Development), Chief Officer - Health and Social Care Moray, Chief Financial
Officer, Head of Governance, Strategy and Performance, Head of Housing and
Property, Head of Environmental and Commercial Services, Head of Service,
Health and Social Care Moray, Strategic Planning and Development Manager,
Moray Growth Deal Programme Manager, Principal Planning Officer and
Democratic Services Manager.   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 and The Councillors' Code of conduct the
Council noted that there were no declarations for Group Leaders or Spokesperson
in regard to any prior decisions taken on how members will vote on any item on the
agenda or any declarations of Member's interests in respect of any item on the
agenda.  
In terms of transparency, Councillors Gordon and Macrae asked that in terms of
Item 12 on the agenda, Charging for Services they were directors of the Board of
Moray Leisure.  
Councillor Williams, in terms of Items 11, 14 and 19 on the agenda asked that it be
noted that for transparency a member of his family was employed by an
Item 4b.
Page 19

Page 20

organisation involved in the items but following advice from the Monitoring Officer
felt it did not meet the 2 part test and would remain in the meeting.  
3.         Resolution 
Councillor Ross sought clarification on why Item 19 on the agenda was being held
in confidence on the agenda.  In response, the Chair confirmed that it was due to
commercial sensitivity.   
Thereafter the meeting resolved that in terms of Section 50A (4) and (5) of the
Local Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 18 - 21 of business on the
grounds that it involves the likely disclosure of exempt information of the class.  
Para number of the
minute Para Number of Schedule of 7a
19
Para 1
Information relating to staffing matters 
Para 11
Information relating to any consultations or negotiations in
connection with labour relations 
21
Para 9
Information on terms proposed or to be proposed by or to
the Authority 
22
Para 1
Information relating to staffing matters 
4.         Minute of Meeting of Moray Council on 6 December 2023 
The minute of the meeting of Moray Council on 6 December 2023 was submitted
and unanimously approved.  
5.         Minutes of Special Meeting of Moray Council on 12 December 2023 
The minute of the Special Meeting of Moray Council on 12 December 2023 was
submitted and unanimously approved.  
6.         Minutes of Special Meeting of Moray Council on 24 January 2024 
The minutes of the Special Meeting of Moray Council on 24 January 2024 was
submitted and unanimously approved.  
7.         Written Questions 
The Council noted that no written questions had been submitted.   
Page 20

Page 21

8.         Notice of Motion - Report Request on Artificial Intelligence 
In terms of Standing Order 35a there was submitted a Notice of Motion by
Councillor Leadbitter, seconded by Councillor Lawrence in the following terms:  
Artificial Intelligence  
Preliminary Issues
None to consider  
Background 
Artificial Intelligence (AI) is rapidly evolving as a consequence of recent
advancements in technology and the design of competing artificial intelligences in
a wide range of environments. 
It is widely reported that the pace of development of AI is highly likely to be the
most rapidly evolving technology ever seen by humankind with many potential
applications - both positive and negative. 
AI is better understood in some industries than others and it is vital that the public
sector, including Local Government is embracing and understanding this issue,
ensuring we have actions in place to help us both utilise AI and manage its impact
on our communities and the services we provide for them.  
At the recent AI Safety Summit the introductory paragraph stated: 
“We are in the midst of a technological revolution that will fundamentally alter the
way we live, work, and relate to one another. Artificial Intelligence (AI) has begun
and promises to further transform nearly every aspect of our economy and society,
bringing with it huge opportunities but also risks that could threaten global stability
and undermine our values.” 
This provides a useful summary of what we require to understand in the deliver of
our own services. 
Action 
Council requests an officer report providing a high-level assessment of the
Council’s readiness in respect of the rapidly evolving impact of (AI) across our
operations, including but not limited to: 
Financial implications 
• the risks and opportunities for the broad range of services provided by the
council;
▪ N.B. It should be understood that whilst the Council’s ICT Service
will have a key role to play, the risks and opportunities are much
broader and could impact significantly on the provision and structure
of a wide range of services 
• skills gaps that the Council may have in relation to AI and how they might be
addressed; 
• strategies and policies that require to be developed and/or updated in respect
of AI; 
Page 21

Page 22

• estimated timescales over which such strategies and policies should be
considered; 
• the potential risks of not taking action. 
• Any direct costs would relate to further actions, which would be considered in
the requested report. 
• There is an indirect cost of officer time, however as AI is a major and rapidly
emerging technology across our services, and which has the potential to both
enhance and disrupt those services in a comparatively short timeframe, it is
expected that officers will already be considering potential implications for their
services and the Council as a whole, therefore this motion sets in place a clear
route for Councillors to consider this urgent emerging issue.  
The Chair advised that the Council has an ICT Digital Strategy and Action Plan
which was approved by Corporate Committee on 29 August 2023 and Priority 4
was Forward Planning which had the following action at 4.8 - considers the
potential for new solutions i.e. AI, Chatbots, the internet of things to deliver
improvements to service delivery and efficiencies with the planned outcomes of
benefits of implementing solutions identified and incorporated into forward plans
with Services with a measure of new technologies adopted within services.  The
timing of this work is March 2025/26 with a priority rating of 3 with clear benefits for
importance that may be outweighed by other actions. 
The Chair further added that the Council recognises the pace at which technology
moves and are also aware that as part of the budget it was agreed to add as part
of the transformation reserve so the Council can invest in innovation. 
The Chair continued that it was important that any benefit from AI is appropriately
prioritised alongside other essential ICT work already agreed.  She therefore
proposed that the Strategic Leadership Forum consider the issue and bring
forward as part of the annual update to the ICT Digital Strategy and Action Plan
ahead, of the August timescale for review. 
The Depute Chief Executive (Education, Communities and Organisational
Development) confirmed that the Council's ICT Strategy covers all services and
not just the ICT section and sets the Council's digital priorities within the Corporate
Plan and covers staff and customer expectations and the need for services to fully
engage in using the technologies in order to drive out the benefits.   
She further added that if the Council was minded to accelerate the work around AI
then the intention would be that it would be looked at in the area of advantages to
services but would need to consider re-prioritising both within ICT and Services in
terms of how the work would be brought forward and guidance from Council on the
work to be prioritised would be helpful. 
Councillor Macrae proposed discussing the issue at the ICT Working Group initially
for discussion and then for a report to be brought back to a future meeting of the
Council. 
Councillor Leadbitter agreed that the pace of AI is accelerating at such a pace, it
would be useful to discuss at the ICT Working Group to determine the information
available to allow Councillors to understand whether this work is a higher priority
than currently prioritised.
Page 22

Page 23

Councillor Lawrence confirmed that the notice of motion is requesting an oversight
of AI within the Council as it will have huge ramifications on all services. 
The Chair agreed that the Strategic Leadership Forum and ICT Working
Group would be a good place to discuss the issue to provide information and
scope for a report back to Corporate Committee as soon as practicable and asked
Councillors Leadbitter and Lawrence if they were happy to accept the amendment. 
The Chief Executive added that there is a lot of work going on with Government
Bodies and partners who are looking at issues for local government and devising
guidance and internal discussions would allow for the national guidance to become
available. 
Following further consideration, Councillors Leadbitter and Lawrence confirmed
that they were happy for the initial discussions to take place with the Strategic
Leadership Forum and to also include the ICT Working Group and for a report to
be presented to Corporate Committee as soon as practicable. 
There being no on otherwise minded the Council agreed that initial discussions
take place with the cross party Strategic Leadership Forum and the ICT Working
Group with a report to be presented to Corporate Committee as soon as
practicable. 
9.         Moray Integration Joint Board Summary Report 
The meeting had before it, a report by the Chief Officer, Health and Social Care
Moray informing the Council of the latest approved minutes of the meetings of the
Moray Integration Joint Board.  
Following consideration the Council unanimously agreed to note the content of the
report.  
Councillor McLennan left the meeting during the consideration of this item. 
10.         Revenue Expenditure 31 December 2023 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) advising Council of the revenue budget monitoring
position to 31 December 2023 and the current out-turn for 2023/24.  
As part of her introduction to the report the Chief Financial Officer confirmed that
confirmation had now been received from the Scottish Government that they will not
withhold the retained portion of the grant, which amounts to £769,000 and results in
an underspend of £894,000.  
Following consideration, the Council unanimously agreed the note:  
i) the budget monitoring position of £1,742,000 over budget for 2023/24 as at
31 December 2023;    
ii) that the budget position consists of an underspend on Devolved School
budgets of £818,000, an underspend of £116,000 on Children's Services, an
underspend of £193,000 on General Services Housing and Property, an
overspend of £289,000 on Environmental and Commercial Servics and
Page 23

Page 24

£210,000 on Economic Growth and Development.  There is also an
overspend on Social Care Services delivered on behalf of the Moray
Integration Joint Board of £2,313,000 and an overspend on other services of
£57,000;    
iii) movement of £5,897,000 increase in General Revenue Grants, as detailed
in paragraph 3.5; and    
iv) the current estimated out-turn for 2023/24 of an underspend in Council
services, including Health and Social Care, of £962,00 after adjusting for the
cost sharing agreement with NHS for MIJB.  With projected overspends in
loans charges of £451,000 and increased use of provisions more than
budgeted, this results in an overall projected spend of £1,497,000 but with
additional funding there is a decrease in the use of Council reserves of
£125,000 than is budgeted.   
11.         Capital Plan 2023-24 Q3 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) advising the Council of capital expenditure to 31
December 2023 and of updated estimates of projected expenditure under the
capital plan for 2023/24 profiled into quarters.  
Following consideration the Council unanimously agreed to:  
i) note expenditure to 31 December 2023 of £15,841,000, which is £6million
less than estimated in detail at the end of quarter 2;    
ii) note the current projected expenditure of £25, 178,000 for 2023/24, as set
out in Appendix 1 in detial and as adjusted at top level in paragraph 7.1
below;    
iii) note the projected overall expenditure for projects spanning more than one
financial year, as set out in Appendix 2; and    
iv) approve amendments to the 2023/24 and 2024/25 capital plan as detailed in
section 6.1 of this report.   
12.         Charging for Services 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking Council to approve revised charges for Council
services for 2024/25.  
Following consideration the Council unanimously agreed to approve the charges
for Council services for 2024/25 set out in paragraphs 3.3 and 3.4.  
13.         Telford Bridge Craigellachie 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of the condition of Telford Bridge
and what options were available for its future operation.  
Page 24

Page 25

Following consideration the Council unanimously agreed:  
i) to note the ownership, condition and maintenance responsibilities relating to
the Telford Bridge as set out in the report;    
ii) that the Council's future responsibilities are as set out in para 7.2 - 7.5; and    
iii) that should there be sufficient interest from an external group that the
Council would further explore the options set out in paras 6.7 - 6.10 subject
to its reasonable costs being covered by a third party.      
14.         Moray Growth Deal Annual Report 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) which provided Council with a draft copy of the Moray
Growth Deal's 2023 annual report for consideration.  
The Council joined the Chair in thanking the Moray Growth Deal Team on the work
done on the various projects to date.  
Councillor McLennan re-joined the meeting at this juncture.  
Following consideration, the Council agreed to:  
i) note the draft annual report; and    
ii) delegate authority to the Depute Chief Executive (Economy, Environment
and Finance) to approve a final iteration of the report, following engagement
with key stakeholders and the Scottish and UK Governments.  This will then
be submitted to a future meeting of Moray Council for noting.   
15.         Elgin Long Term Town Plan 
The meeting had before it a report asking the Council to nominate elected
members to sit on the Elgin Town Board and to note progress to establish the
Board following the announcement on 1 October 2023 that Elgin is one of 55
towns in the UK to receive £20million funding from the UK Government.  
As part of his introduction, the Strategic Planning and Development Manager
asked Council to note the following amendments to the report:  
recommendation (iii) should read - note the appointment of the chair of the
Elgin town Board will be done in consultation with the
local MP. 
paragraph 4.8 the reference to 3 years should be 2 years; and    
paragraph 6.3 where the report states 2 elected members, it should read
2 - 4 members, following attendance at a Webinar, which
was attended by representatives of the 55 towns, it was
confirmed that the political balance should be proportional
to the size of the board.  
Page 25

Page 26

Councillor Divers expressed concern that there are no Elgin Councillors included in
the proposed members of the Board.  
Councillor Keith, confirmed that he considered it necessary to have Elgin
Councillors represented on the Board.  
In response, the Head of Governance, Strategy and Performance advised that the
Elgin Town Board should be considered as an outside body and it was a decision
for the Council as to who should be appointed to it.  
Councillor Divers moved that there should be 3 Councillors on the Board 1 from
each party and the Council Leader has the overall Moray wide view.  
In response, the Chair felt, based on the advice given by Officers and the
anticipated size of the Board being 15 members that 4 Councillors would be too
many as it would make up a quarter of the size and that is not the intention of the
Board.  
The Chair proposed a compromise position of the Council Leader and 2 members,
1 from each of the 2 largest opposition groups.  It was further agreed that
representation should be Elgin Councillors in the main therefore it was suggested
that 2/3 of the Council representatives be from Elgin Wards and, if at any time in
future the Council Leader represents an Elgin Ward, then one of the other
positions should taken by a Councillor outwith Elgin to ensure fair geographical
representation.  
Councillor Divers confirmed that he was happy with the proposal.  
Following further consideration the Council unanimously agreed:  
i) note the progress in establishing an Elgin Town Board before the deadline
of 1 April 2024;    
ii) note the guidance in Appendix 1 as to representation on the Board;    
iii) note the appointment of the Chair of the Elgin Town Board will be done in
consultation with the local MP;    
iv) note the proposed initial members of the Board    
v) note the proposed steps and timeline to prepare the 10 year vision and 3
year Investment Plan;    
vi) that the Council Leader and 2 members, 1 from each of the 2 largest
opposition groups be appointed to the Board with 2/3 of the Council
representatives being from Elgin Wards and, if at any time in future the
Council Leader represents an Elgin Ward, then one of the other positions
should taken by a Councillor outwith Elgin to ensure fair geographical
representation; and     
vii) Group Leaders to notify Committee Services with the names of the
Councillors who will be sitting on the Board including the substitute
members    
Page 26

Page 27

16.         Review of Standing Orders 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) inviting the Council to consider the
timescale for changes to the Council's Standing Orders as detailed in Section 4 of
the report.  
In respect of the proposal to stop reading out written questions Councillor
Leadbitter sought clarification that the member submitting the written question
would still be able to ask a supplementary question and that the response to the
written question should be published prior to the Committee meeting.  
In response, the Head of Governance, Strategy and Performance confirmed that a
supplementary question would still be allowed and that the question and response
would be published prior to the meeting.  
Councillor van der Horn asked that Officers look at how apologies are recorded
and the reasons for the absence.  
The Head of Governance, Strategy and Performance replied that this was not
something that was covered under Standing Orders but would be covered by a
review of the Remote Meetings Protocol under the second tier governance
documents and agreed to look at the issue with the Democratic Services Manager.  
Councillor McLennan moved to remove the recommendation to remove Question
Time from the agenda.  On failing to find a seconder, Councillor McLennan's
motion fell and in terms of Standing Order 67 his dissent was recorded.  
Following further consideration the Council agreed:  
i)  the material changes to Standing Orders as set out in paragraph
4.1/Appendix 1;     
ii) the proposed minor changes to Standing Orders set out in paragraph 4.2
below/Appendix 2;    
iii) that a final version of the Standing Orders, incorporating the agreed position
from recommendations (i) and (ii) above, will be submitted to the next
meeting of the Council; and    
iv) to defer the wider annual review of the Scheme of Administration and
Scheme of Delegation from May 2024 until December 2024 to bring the
reviews back in line with the annual Standing Orders review.        
17.         Public Performance Report 2022-23 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Council to consider the
Public Performance Report (PPR) 2022-23 which reports progress and
performance of Council services against Corporate Plan priorities.  
Page 27

Page 28

Following consideration the Council approved the Public Performance Report
2022-23 in its reporting of Council performance and progress against Corporate
Plan priorities and agree the PPR for publication on the Council website.  
18.         Question Time 
Under reference to the minute of the meeting of Moray Council on 6 December
2023, Councillor Ross sought clarification on why comments made by Councillor
Harris had not been minuted.  
In response, the Head of Governance, Strategy and Performance confirmed that
the minutes are not a verbatim record of meetings.   
19.         Voluntary Early Retirement Application [Para 1] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking Council to consider an
application under the terms of the agreed Voluntary Early Retirement (VER)
Scheme.  
Following consideration the Council unanimously agreed to approve the
application for Voluntary Early Retirement contained within Appendix A. 
20. RESUMPTION OF MEETING 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Tracy Colyer,
Councillor Theresa Coull, Councillor John Cowe, Councillor John Divers,
Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor Donald Gatt,
Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith, Councillor
Scott Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor
Paul McBain, Councillor Neil McLennan, Councillor Shona Morrison, Councillor
Bridget Mustard, Councillor Kathleen Robertson, Councillor Derek Ross, Councillor
John Stuart, Councillor Draeyk van der Horn, Councillor Sonya Warren, Councillor
Ben Williams 
APOLOGIES 
Councillor Neil Cameron 
IN ATTENDANCE 
Chief Executive, Depute Chief Executive (Economy, Environment and Finance),
Head of Governance, Strategy and Performance, Head of Housing and Property,  
Principal Planning Officer and Democratic Services Manager. 
21.         Elgin Community Centre [Para 9] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) providing Council with an update on discussions
regarding the future short-term use of Elgin Community Centre and an approach
made to Officers about leasing or selling the property.  
Page 28

Page 29

Following consideration the Council unanimously agreed:  
i) to note the update provided in relation to agreeing terms for a short term
lease to Elgin Town Hall Group detailed in paragraph 4.3;    
ii) to note that an approach has been made to Officers about the potential
lease or sale of the property detailed in paragraphs 4.5; 4.6 and Appendix
III; and    
iii) that Officers continue to facilitate Elgin Town Hall Group's short term use of
Elgin Community Centre as outlined in the report approved at Council on 28
June 2023 (para 19 of the minute refers). 
22.         Recruitment of Interim Chief Executive 
The meeting had before it a report by the Chief Executive asking the Council to
note the proposed arrangements for recruiting an interim Chief Executive.  
The Council joined Councillor Cowe in wishing Mr Burns a happy and health
retirement.  
Councillor Keith sought clarification on how the recruitment panel was made up as
he felt that the Labour Group should be represented in the panel.  
The Chair confirmed that there was no intention to exclude the Labour Group and
that she would be happy to swap the Civic Leader for Councillor Keith on the panel
but re-assured Councillor Keith the appointment would not be a political one, the
appointment would be based on what is best for Moray Council.  
Councillor McLennan moved that the panel should consist of members from every
political party and independent Councillors.  On failing to find a seconder,
Councillor McLennan's motion fell and in terms of Standing Order 67 his dissent
was recorded.  
Following further consideration, the Council agreed to note the proposed
arrangements for recruitment of an interim Chief Executive, subject to the change
to members on the recruitment panel. 
Page 29

Page 30

Page 30

Page 31

MORAY COUNCIL 
Minute of Special Meeting of the Moray Council 
Wednesday, 27 March 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Tracy Colyer,
Councillor Theresa Coull, Councillor John Cowe, Councillor John Divers, Councillor
Amber Dunbar, Councillor Jérémie Fernandes, Councillor Donald Gatt, Councillor
David Gordon, Councillor Juli Harris, Councillor Sandy Keith, Councillor Scott
Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor Paul
McBain, Councillor Neil McLennan, Councillor Shona Morrison, Councillor Bridget
Mustard, Councillor Kathleen Robertson, Councillor Derek Ross, Councillor John
Stuart, Councillor Draeyk van der Horn, Councillor Sonya Warren, Councillor Ben
Williams 
APOLOGIES 
Councillor Neil Cameron 
IN ATTENDANCE 
Chief Executive, Depute Chief Executive (Economy, Environment and Finance), Head
of Governance, Strategy and Performance, Head of Environmental and Commercial
Services, Environmental Services Manager, Consultancy Manager, Democratic
Services Manager, Communities Service Manager and Opportunities for All Officer.   
1. Chair 
The meeting was chaired by Councillor Kathleen Robertson. 
2.         Message of Condolence 
The Council joined the Chair in sending their thoughts and condolences to all the
families affected by the tragic road accident the evening before and passed on their
thanks to all those from the emergency services who would have attended the scene.  
3.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Orders 21 and 23 and The Councillors' Code of conduct
Councillor Robertson confirmed that the Conservative Group would be voting as a
group in relation to Item 5b on the agenda. 
The Council noted that there were no other declarations for Group Leaders or
Spokesperson in regard to any prior decisions taken on how members will vote on any
item on the agenda or any declarations of Member's interests in respect of any item on
the agenda.  
Item 4c.
Page 31

Page 32

4.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media representatives be excluded
from the meeting for Items 18 - 21 of business on the grounds that it involves the likely
disclosure of exempt information of the class.  
Para number of the
minute Para Number of Schedule 7a
6
Para 9
Information on terms proposed or to be proposed by or to
the Authority   
5.         Charging for Services 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Council to approve the revised charges for
Council services for 2024/25.  
Following consideration the Council unanimously agreed to:  
i) note that a review of the out of area policy will be undertaken as set out in para
3.10; and    
ii) approve the charges for Council services for 2024/25 set out in paragraph 3.3.   
6.         Review of Standing Orders 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) inviting Council to approve the revised
Standing Orders following the 2023/24 review.  
In introducing the report, the Head of Governance, Strategy and Performance spoke
about the reasons for absence and confirmed that it was open to Members to reach a
decision on whether to record reasons for apologies. 
Councillor Williams indicated that for various reasons, including the safety of
Councillors and their families that he was not in favour of having to submit reasons for
absence other than if it was due to technical reasons and moved to remove the other
reasons indicated in the report.  
Councillor Fernandes confirmed that he also felt there was no reason to record
reasons for absence and seconded the motion.  
Councillor Macrae stated that he was happy to accept the reasons proposed in the
report as he felt that when Councillors are elected to office, they are accountable to the
public and for transparency proposed adopting the absence reasons.  He further added
that members of the public are interested in members attendance and expenses. This
was seconded by Councillor Leadbitter.  
Councillor Leadbitter in supporting the amendment added that work is being done
through CoSLA and other bodies to try and professionalise the role of Councillors in a
Page 32

Page 33

bid to make it more attractive to people in the future to increase the representation in
Chambers across the country.  
Councillor Dunbar sought agreement from Councillor Williams to amend his motion to
include the Other Council Business option as she had been unable to attend some
meeting due to other Council commitments.  Councillor Williams and Councillor
Fernandes confirmed that they were happy to accept this addition. 
Councillor Lawrence sought clarification on how connection issues would be
determined as a reason for absence.  
In response, the Head of Governance, Strategy and Performance confirmed that this
reason would be used if the Council had failed to provide the system to allow Members
to join remotely as had happened recently and not individual connection issues due to
poor broadband. 
On the division there voted:  
For the Motion (12)
Councillors Williams, Fernandes, Bloomfield, Colyer,
Divers, Dunbar, Gatt, Keith, McLennan, Mustard,
Robertson and Ross.
For the Amendment (13)
Councillors Macrae, Gordon, Allan, Coull, Cowe, Harris,
Lawrence, Leadbitter, McBain, Morrison, Stuart, van der
Horn and Warren
Abstention (0)    
Accordingly the amendment became the finding of the meeting and Council agreed:  
i) the final version of the Council's Standing Orders following the 2023/24 review;
and    
ii) to record reasons for apologies submitted for Committee meetings.    
7.         Cloddach Bridge Business Case 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of the draft business case for the
replacement of Cloddach Bridge and to seek a decision on whether the Council will
provide funding for the replacement.  
Councillor Mustard moved to note recommendations (i) and (ii) and agree to resource
(iii) and (iv).  This was seconded by Councillor Dunbar.  
During consideration concern was raised by a number of Councillors on where the
additional money for the bridge was going to come from and what other projects would
be affected by the decision to progress with this works.  
Councillor Leadbitter therefore proposed agreeing recommendation (i) and (ii), deleting
recommendations (iii) and (iv) and replacing with a new recommendation (iii) as
follows:  
For the reasons set out in para 3.15 agree to delegate authority to the Head of
Environmental and Commercial Services in consultation with the Council Leader and
Chief Executive to present the Full Business Case to the Department for Transport
Page 33

Page 34

(DfT) and HM Treasury stating that the Council will support the construction of a
replacement bridge, as per the significance placed on the project by the Chancellor of
the Exchequer during his Financial Statement and Budget Report of 15 March 2023,
subject to the UK Government covering all construction and project management
costs.  
This was seconded by Councillor Keith.  
On the division there voted:  
For the Motion (12)
Councillors Mustard, Dunbar, Bloomfield, Colyer, Cowe,
Gatt, Gordon, Macrae, McBain, Robertson, Ross and
Williams
For the Amendment (12) 
Councillors Leadbitter, Keith, Fernandes, Coull, Divers,
Harris, Lawrence, McLennan, Morrison, Stuart, van der
Horn and Warren 
Abstention (1) Councillor Allan  
There being an equality of votes, the Chair in terms of Standing Order 65(e) had the
casting vote and voted in favour of the Motion.  Therefore the motion became the
finding of the meeting and Council agreed to:  
i) note the findings of the draft Economic and Financial Case from the Business
Case to replace Cloddach Bridge;    
ii) note that the community has been unable to source funding to date;    
iii) resource the remaining £2.737million required to fully fund and the design and
construction of a replacement bridge from Council capital funding; and    
iv) delegate authority to the Head of Environment and Commercial Services in
consultation with the Council Leader and Chief Executive for approval and
submission of the Full Business Case to the Department for Transport.   
8.         New Elgin Community Hub [Para 9] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking approval to allocate funds to support the lease of a
new community hub in the New Elgin area, on behalf of the Moray Pathways Local
Employability Partnership.  
Councillor Mustard moved to include an additional recommendation for a report to
come back to Council in 9 months time to report on the outcomes of the project.  
Following further consideration and there being no one otherwise minded the Council
unanimously agreed to:  
i) approve the carry forward and allocation of funds to support the lease of a new
community hub in the New Elgin area, on behalf of the Moray Pathways Local
Employability Partnership; and    
ii) instruct the Head of Housing and Property to negotiate main lease terms of an
appropriate property and subsequently instruct the Legal Services Manager to
Page 34

Page 35

conclude a lease, subject to this and ancillary costs set out in the report being
within the budget carried forward.
iii) Update report to come back to Council for consideration in 9 months on the
outcomes of the project to date.   
Page 35

Page 36

Page 36

Page 37

MORAY COUNCIL 
Minute of Special Meeting of the Moray Council 
Wednesday, 24 April 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe, Councillor
John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith,
Councillor Scott Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Shona Morrison, Councillor Bridget Mustard,
Councillor Kathleen Robertson, Councillor Derek Ross, Councillor John Stuart,
Councillor Draeyk van der Horn, Councillor Sonya Warren 
APOLOGIES 
Councillor Neil McLennan, Councillor Ben Williams 
IN ATTENDANCE 
The Chief Executive, Depute Chief Executive (Economy, Environment and Finance),
Depute Chief Executive (Education, Communities and Organisational Development),
Head of Governance, Strategy and Performance, Head of Environmental and
Commercial Services, Head of Economic Growth and Development, Head of HR, ICT
and Organisational Development, Chief Financial Officer, Strategic Planning and
Development Manager, Legal Services Manager, Rowena MacDougall, Planning
Officer and Democratic Services Manager. 
1. Chair 
The meeting was chaired for Items 2 – 16 by Councillor Kathleen Robertson and Items
17 and 18 by Councillor Donald Gatt.  
2.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Order 21 and 23 and the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda.    
3.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media representatives
be excluded from the meeting for Items 17 - 19 of business on the grounds that it
involves the likely disclosure of exempt information of the class.    
Para number of the
minute Para Number of Schedule 7a
Item 4d.
Page 37

Page 38

5
1
Information Relating to Staffing Matters 
6
1
Information Relating to Staffing Matters 
11
Information relating to any consultations or negotiations in
connection with labour relations 
7
6
Information relating to the financial or business affairs of any
particular person(s) 
8
Information on the amount of expenditure proposed to be
incurred by the Authority. 
4.         Welcome Back 
The Council joined the Chair in welcoming Councillor Cameron back to his first meeting 
following a period of illness.  
5.         Varying Order of Business 
In terms of Standing Order 29, the Chair sought agreement from the Council to
suspend Standing Order 29 and deal with the confidential items on the agenda first to
ensure they could be considered by all Councillors as the Chair and one of the
confidential report authors needed to leave, possibly prior to the report being
considered.  
This was unanimously agreed.  
6.         Short to Medium Term Financial Planning [Para 1] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) to consider feedback from consultation on those savings
approved subject to consultation and to consider amendments to the Council's budget
projections since the budget was approved.  
Councillor Gatt moved to approve the recommendations and agree Option 3 as
detailed in paragraph 6.3 of the report.  This was seconded by Councillor Macrae.  
Councillor Leadbitter confirmed that although he was not in disagreement with the
motion from Councillor Gatt, he wished to test what the Council thought and
seconded by Councillor Fernandes proposed approving the recommendations and
agree Option 2 as detailed in paragraph 6.3.  
On the division there voted:  
For the Motion (14)
Councillors Gatt, Macrae, Allan, Bloomfield, Colyer,
Cowe, Divers, Dunbar, Gordon, Keith, McBain,
Mustard, Robertson and Ross 
Page 38

Page 39

For the Amendment (9) Councillors Leadbitter, Fernandes, Cameron, Coull,
Harris, Lawrence, Morrison, Stuart and Warren
Not Voted (1) Councillor van der Horn  
Accordingly, the motion became the finding of the meeting and the Council agreed to:  
i) note the revised estimated out-turn for 2023/24 and revised budget for
2024/25;    
ii) approve option 3 as detailed in paragraph 6.3; and    
iii) approve the savings summarised in Appendix 2, having first considered the
results of the consultation as summarised in paragraphs 5.7 - 5.8 and more
fully in Appendix 3. 
7.         Voluntary Early Retirement Application [Para 1 and 11] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Council to consider an
application under the terms of the agreed Voluntary Early Retirement (VER) Scheme.  
Following consideration, the Council unanimously agreed:  
i)  to proceed with the proposed reduction of the post outlined in Appendix A; and    
ii) approve the application for Voluntary Early Retirement contained therein.  
8.         Buckie Dredging Update [Paras 6 and 8] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Council to homologate the decision made by
the Chief Executive and to inform the Council of additional costs to the approved
dredging works that are required in Buckie Harbour to ensure that the Council is
meeting its obligations.  
Following consideration, the Council unanimously agreed to homologate the decision
made by the Chief Executive to approve additional costs of up to £450,000 to the
approved dredging works that are required in Buckie Harbour to ensure that the
Council is meeting its contractual obligations.  
9.         Transformation Strategy 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Council to approve a first
iteration of work towards a new Council Transformation Strategy.  
Following consideration, the Council unanimously agreed to:  
i) approve the first iteration of work towards developing the Council
Transformation Strategy (Appendix 1) to ensure a continued focus on delivery
transformation projects to support the Council's financial sustainability and
provide a sound foundation for essential future transformation work; and    
ii)   further development work set out in the report.
Page 39

Page 40

10.         Moray Town Centre Health Check 2023 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) reporting the key findings of the Moray Town Centre
Health Check 2023 and to ask the Council to consider adopting the Moray Town
Centre Health Check Report 2023 as a material consideration in future retail planning
policy and planning application decision making.  
Following lengthy consideration, the Council unanimously agreed to:  
i) note the findings of the Moray Town Centre Health Check Report 2023 and the
first town centre perception survey;    
ii) adopt the Moray Town Centre Health Check Report 2023, as set out in
Appendix 1, as a material consideration in future retail planning policy and
planning application decision making from 30 April 2024;    
iii) the publication of the Town Centre Health Check Report 2023 on the Planning
and Development website pages; and    
iv) note the ongoing work to source town centre footfall counters.     
11.         Moray Play Sufficiency Assessment 2023 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Council to consider and approve the Moray
Play Sufficiency Assessment 2023.  
Following consideration, the Council unanimously agreed: 
i) to note the findings of the Moray Play Sufficiency Assessment 2023;    
ii)  the Moray Play Sufficiency Assessment, as set out in Appendix 1;    
iii) the Moray Play Sufficiency Assessment 2023, as set out in Appendix 1; as a
material consideration for future planning policy and planning application
decision making from 30 April 2024 and submit this a part of the Local
Development Plan Evidence report; and     
iv)  to delegate authority to the Head of Economic Growth and Development to
prepare a StoryMap of the Moray Play Sufficiency Assessment and for this to
be published online.   
12.         Draft Local Heat and Energy Efficiency Strategy 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking the agreement of the Council to approve the draft
Moray Local Heat and Energy Efficiency Strategy (LHEES) and Delivery Plan ahead
of public consultation.  
Following consideration, the Council agreed to:
Page 40

Page 41

i) approve the draft Local Heat and Energy Efficiency Strategy (LHEES)
(Appendix 1) and Delivery Plan (Appendix 2); and    
ii) note that following public consultation on the draft strategy and delivery plan,
the final versions will be presented to Council on 26 June 2024 for approval. 
13.         Natural Capital Enhancement Opportunities 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) presenting the results of studies conducted to identify
natural capital enhancement opportunities in Moray and to seek the agreement of the
Council to progress the opportunities identified via the local development plan and
development of a suitable project delivery model.  
Following consideration the Council unanimously agreed:  
i) to note the contents of studies conducted to identify natural capital
enhancement opportunities on Moray Council managed land (Appendix 1) and
the wider Moray area (appendices 2 and 3); and    
ii) that the opportunities identified be progressed as part of the Council's next local
development plan and through development of a suitable project delivery model
to be presented to and agreed by a future meeting of the Council.    
14.         National Planning Framework 4 Policy 11c - Maximising Net Economic
Impact Draft Supplementary Planning Guidance 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking Council to agree the draft Maximising Net
Economic Impact Supplementary Planning Guidance and that it be subject to public
consultation for a period of 12 weeks.  
Following consideration, the Council agreed:  
i) the draft Maximising Net Economic Impact Supplementary Planning Guidance
and that the draft is made available for public consultation for a period of 12
weeks;    
ii)  that responses to the draft be reported back to a future meeting of the
Planning and Regulatory Services Committee; and     
iii) that external consultancy support is commissioned to work with Officers and
partners to develop a Regional Socio-Economic Impact Plan.    
15.         Tribute to Member of Staff Leaving 
The meeting, in noting that this would be the last meeting of the Council prior to the
Head of Economic Growth and Development, retiring from the Council, joined the
Chair in paying tribute to Mr Grant for his contribution to the delivery of Council
services in Moray and wished him well for the future.  She further thanked him for all
his help to herself and fellow Councillors over the years.  
Page 41

Page 42

16.         Draft Moray Woodland and Forestry Strategy 2024 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking Council to agree the draft Woodland and Forestry
Strategy as part of the evidence for the new Local Development Plan and to agree
that the draft Strategy be subject to public consultation for a period of 12 weeks.  
Following consideration the Council unanimously agreed:  
i) the draft Moray Woodland and Forestry Strategy 2024    
ii) the draft strategy is made available for public consultation for 12 weeks; and    
iii) that responses to the draft will be reported back to the Planning and Regulatory
Services Committee.  
17.         Biodiversity Study 
Prior to consideration of the item, Councillor Gatt took over the role of Chair of the
meeting as Councillor Robertson had to leave the meeting at 12.30pm.  
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of the contents and
recommendations from a Biodiversity Study undertaken to provide evidence for the
next Local Development Plan.  
Following consideration, the Council unanimously agreed to:  
i) note the contents and recommendations within the Biodiversity Study and their
relation to the next Local Development Plan; and    
ii) approve the approach outlined in paragraph 4.6 to outsource ecological
expertise for larger or complex planning applications.  
Councillor Robertson left the meeting following the consideration of this item.   
18.         Moray Local Development Plan 2027 Evidence Report 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Council to approve the Evidence Report for the
Moray Local Development Plan 2027 and delegate authority to the Head of Economic
Growth and Development to submit to the Scottish Ministers for the Gatecheck.  
Following consideration, the Council unanimously agreed to:  
i) approve the Evidence Report for the Moral Local Development Plan 2027
(LDP27);    
ii) note that the Strategic Environmental Assessment (SEA) Scoping Report will
be submitted to the SEA Gateway;    
iii) delegate authority to the Head of Economic Growth and Development to
update the Evidence Report to include references for core documents and
other relevant evidence and consultees; and
Page 42

Page 43

iv)  delegate authority to the Head of Economic Growth and Development to
submit the Evidence Report to the Scottish Ministers via the Scottish
Government Division for Planning and Environmental Appeals (DPEA) for the
Gatecheck.     
Page 43

Page 44

Page 44

Page 45

REPORT TO: MORAY COUNCIL ON 22 MAY 2024 
SUBJECT: ANNUAL APPROVAL OF COUNCIL CONTRIBUTION TO MORAY
INTEGRATION JOINT BOARD ANNUAL BUDGET AND BOARD
MINUTES FOR INFORMATION 
BY:  CHIEF OFFICER, HEALTH AND SOCIAL CARE MORAY 
1. REASON FOR REPORT 
1.1 To approve the Council’s contribution to the Moray Integration Joint Board
(MIJB) budget and to inform the Council of the latest approved minutes of the
meetings of the MIJB. 
1.2 This report is submitted under Section II (22) of the Council's Scheme of
Administration relating to the Moray Integration Joint Board (MIJB). 
2. RECOMMENDATION 
2.1 It is recommended that the Council:  
i) consider and note the annual contribution to the MIJB budget; 
ii) note a recovery plan is being prepared in an endeavour to manage 
the overspend of the budget; and 
iii) note the content of this report in regards to the approved Minutes. 
3. BACKGROUND 
3.1 The MIJB was established on 6 February 2016 under the terms of the Public
Bodies (Joint Working) (Scotland) Act 2014 with full delegation of functions
and resources to enable integration of primary and community health and
social care services effective from 1 April 2016. The MIJB is a separate legal
organisation and acts as principal in its own right. 
The principal ambitions of health and social care integration are to: 
• Support the improvement of the quality and consistency of services for
patients, carers, service-users and their families.
• Provide seamless, joined-up quality health and social care services in
order to care for people in their homes or a homely setting where it is
safe to do so.
• Ensure resources are used effectively and efficiently to deliver services.
Item 6.
Page 45

Page 46

Financial Management of the MIJB 
3.2 As Council is aware from the regular financial monitoring reports produced by
the Chief Financial Officer and reported to Corporate Committee and where
appropriate meetings of Council, there is a significant overspend in the budget
of the MIJB. 
3.3 Financial management of the MIJB is regulated by the Health and Social Care
Integration Scheme (Appendix 1). This Scheme provides where appropriate
that variations to planned expenditure by the MIJB be resolved by agreement
being reached by the MIJB Chief Officer, the MIJB Chief Financial Officer and
Director of Finance of NHS Grampian and the Section 95 Officer of the
Council (Chief Finance Officer) must agree a recovery plan to balance the
overspending balance. 
3.4 Agreement has been reached between the respective officers and work is
currently underway to produce the required recovery plan in an endeavour to
balance the overspending budget. 
Minutes 
3.5 The approved minute from the MIJB meeting held on 25 January 2024, which
was accepted as a correct record of the meeting on 28 March 2024, can be
found at Appendix 2.  A few key highlights from the meeting for the Moray
Council to note were, the MIJB: 
25 January 2024
• Following a lengthy discussion, noted a report by the Chief Officer (CO)
detailing the CO activities that support the delivery of the MIJB’s strategic
priorities.
• Noted the findings of the strategic review of the neurorehabilitation pathway
and agreed that Aberdeen City IJB, as host IJB for this service, implements
the proposed changes to the pathway in collaboration with Health and
Social Care Moray (HSCM).
• Agreed to note the Chair and Vice Chair are due to rotate on 1 April 2024
and appointed Sandy Riddell as Chair of Audit, Performance and Risk
Committee from 1 April 2024.
• Noted a progress report on Locality Plans and agreed that further progress
reports be brought to the MIJB on a six monthly basis.
• Noted the current position in relation to Hopeman and Burghead branch
surgery buildings and noted the request from the Cabinet Secretary for NHS
Recovery, Health and Social Care that an officer from another Health and
Social Care Partnership meet with representatives from HSCM to discuss
the engagement and consultation process undertaken regarding the
Hopeman and Burghead branch surgery premises.
• Agreed the role of Glasgow School of Art in supporting General Practice
visioning work within Moray.
• Agreed the initiation of a process to begin scoping a replacement Social
Work services client based recording system. 
• Agreed the reappointment of Chief Internal Auditor for a further period of
two years.
• Agreed the reappointment of Standards Officer and Depute Standards
Officer for further period of two years.
Page 46

Page 47

• Noted that a Care for People Operational Framework has been developed
in conjunction with its partners.
• Approved the MIJB Reserves Policy.
• Agreed to hold a workshop as soon as practicable to consider detailed and
costed options with associated risks for transformational change to address
the budget deficit and that the outcomes from the workshop be reported to
the Board at the earliest opportunity for approval in order to set a balanced
budget. 
3.6 The link to the webcast and reports submitted to the MIJB meeting on 25
January 2024 can be found here:
https://moray.cmis.uk.com/moray/CouncilandGovernance/Meetings/tabid/70/ct
l/ViewMeetingPublic/mid/397/Meeting/2009/Committee/18/Default.aspx 
3.7 The MIJB approved a working budget at the Board meeting on 28 March
2024, with the MIJB to consider a budget with savings to be agreed at its
meeting on 30 May 2024.  On 30 May the MIJB will be presented with a
budget and recovery plan that will close the in year financial gap as far as
possible, with savings that will potentially deliver over 2 years in full. 
3.8 Approved minutes, reports and link to webcast library for all MIJB meetings
can be found here:
https://moray.cmis.uk.com/moray/CouncilandGovernance/Committees/tabid/6
2/ctl/ViewCMIS_CommitteeDetails/mid/381/id/18/Default.aspx 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report forms part of the governance arrangements of MIJB; good
governance arrangements will support the Board to fulfil its objectives. 
(b) Policy and Legal
There are no policy or legal implications associated with this report. 
(c) Financial implications
Work is currently underway in accordance with the Integration Scheme
which regulates the process for addressing variations to the planned
expenditure by the MIJB in an endeavour to balance the budget. 
There are no financial implications associated with Appendix 2 of this
report. 
(d) Risk Implications
There are no risk implications associated with this report. 
(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
There are no property implications arising from this report. 
Page 47

Page 48

(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required as there is no change
to policy and procedures resulting from this report. 
(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity implications arising from this
report. 
(i) Consultations
Consultation on this report has taken place with Corporate Manager,
Health and Social Care Moray who is in agreement with the content in
relation to their area of responsibility. 
5. CONCLUSION 
5.1 This report provides a summary of the business addressed by the MIJB
at their meeting on 25 January 2024. 
Author of Report: Isla Whyte, Interim Support Manager, Health and Social
Care Moray
Background Papers: available online 
Ref: SPMAN-305227695-136 
Page 48

Page 49

MORAY INTEGRATION JOINT BOARD 
DIRECTION 
Issued under Sections 26-28 of the Public Bodies (Joint Working)
(Scotland) Act 2014 
1. Title of Direction and Reference
Number
MIJB Updated Budget Position
20240328MC10
2. Date Direction issued by the Moray
Integration Joint Board
28.03.2024
3. Effective date of the Direction 01.04.2024
4. Direction to: Moray Council 
5. Does the Direction
supersede/update a previous
Direction?  If yes, include the
reference number(s) of previous
Direction
Yes last budget monitoring report for
Quarter 3 of 23/24 budget outturn to
MIJB on 28.03.2024
6. Functions covered by Direction All functions listed in Annex 1, Part
1 of the Moray Health and Social
Care Integration Scheme and all
functions listed in Annex 2, Part 1 of
the Moray Health and Social Care
Integration Scheme. 
7. Direction Narrative  Directed to deliver for the Board, the
services noted below in pursuance
of the functions noted below and
within the associated budget noted
below
8. Budget Allocation by MIJB to deliver
on the Direction
Moray Council associated budget -
£89.6 million, of which £0.7 million is
ring fenced for Housing Revenue
Account aids and adaptations. 
All details contained in APPENDIX 1
to the report
9. Desired Outcomes The direction is intended to update
and reflect the budget position for
2024/25 
Item 6.
Page 49

Page 50

10. Performance monitoring
arrangements and review
Directions will be reviewed by the
Audit Performance & Risk
Committee on a six monthly basis
for assurance.  Any concerns should
be escalated at the first available
opportunity to the MIJB. 
An annual report of all current
Directions will be presented to the
MIJB 
Page 50

Page 51

MINUTE OF MEETING OF THE MORAY INTEGRATION JOINT BOARD 
Thursday, 25 January 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Mr Simon Bokor-Ingram, Professor Duff Bruce, Mr Sean
Coady, Councillor Tracy Colyer, Ms Sonya Duncan, Councillor Scott Lawrence, Dr
Robert Lockhart, Ms Deirdre McIntyre, Mr Derick Murray, Ms Deborah O'Shea, Mr
Sandy Riddell, Mr Dennis Robertson, Ms Elizabeth Robinson, Ms Tracy Stephen, Mr
Kevin Todd, Councillor Ben Williams 
APOLOGIES 
Mr Ivan Augustus, Mr Roddy Burns, Mr Adam Coldwells, Ms Jane Ewen, Dr Malcolm
Simmons 
IN ATTENDANCE 
General Manager, Dr Gray's Hospital; Marie Simpson, Programme Manager,
Digital Health and Care Innovation Centre (DHI) Scotland; Transformation
Programme Manager, Aberdeen City Health and Social Care Partnership; Lead
Pharmacist Primary Care, Moray Health and Social Care Partnership (MHSCP);
Lead Pharmacy Technician, MHSCP; Head of Governance, Strategy and
Performance and Caroline O'Connor, Committee Services Officer.   
1.         Chair 
The meeting was chaired by Mr Dennis Robertson.  
2.         Declaration of Member's Interests 
Mr Riddell stated for transparency that he was Chair of the Mental Welfare
Commission Scotland.  
The Board noted that there were no other declarations of member's interests.    
APPENDIX 1
Item 6.
Page 51

Page 52

3.         Minutes of meeting of 30 November 2023 
The minute of the meeting of 30 November 2023 was submitted and approved.  
4.         Action Log of 30 November 2023 
The Action Log of the meeting of 30 November 2023 was discussed and updated
accordingly.  
5.         Thanks 
The Board, in noting that Mr Graham Hilditch had resigned due to other
commitments, joined the Chair in paying tribute to Mr Hilditch for his contribution to
the Board and wished him well for the future.  
6.         Congratulations 
The Board joined the Chair in congratulating Ms Deborah O'Shea, Interim Chief
Financial Officer on her permanent appointment to the post of Chief Financial Officer
with effect from 1 April 2024.  
7.         Chief Officer Report 
The meeting had before it a report by the Chief Officer informing the Board of the
Chief Officer activities that support the delivery against the Moray Integration Joint
Board's (MIJB's) strategic priorities articulated in the Strategic Plan, and the delivery
against the 9 Health and Wellbeing outcomes.  Key work for Moray Health and Social
Care Partnership (HSCP) includes the continuation of a shift in the balance of care
through implementing a Home First approach; remobilisation from the covid
pandemic; supporting measures for the reduction of local covid transmission; and
budget control.  
The Chief Officer provided a further update to the Board in relation to the Ward 4 anti-
ligature work and installation of MRI scanner at Dr Gray's Hospital, advising that
Scottish Government funding was no longer available for the MRI scanner at this time
which would also impact on the Ward 4 anti-ligature work as it was part of the same
project. 
The General Manager, Dr Gray's Hospital advised the Ward 4 work was paused and
further discussions on funding streams would require to be held. 
In response the Chair asked for an update to be prepared for the next meeting of the
Board to provide reassurance regarding discussions and the process for continuation
of the work.  
Mr Riddell expressed concern about the budget pressures relating to Care at Home
service and sought assurance that there was strategic direction with full
understanding how the budget pressures have been manifested.   
In response the Deputy Chief Officer confirmed the current delivery model is not
working and a new outcome focussed delivery model is required.  He confirmed he
would prepare an update for the next meeting of the Board to provide assurance on
the current position and actions undertaken.  
Page 52

Page 53

Mr Murray sought an update on the trends in relation to unmet demand and delayed
discharge. 
In response the Chief Officer agreed a report would be prepared for the next Clinical
and Care Governance Committee.  
Following consideration the Board unanimously agreed:-  
i. to note the content of the report; and 
ii. that transforming services to meet the aspirations of the MIJB's Strategic Plan
remains a priority.  
8.         Strategic Review of Neuro-Rehabilitation Pathway 
The meeting had before it a report by the Lead for Allied Health Professionals and
Specialist Rehabilitation Services and Transformation Programme Manager informing
the Board of the findings and recommendations of a strategic review undertaken to
identify the most effective delivery of Neurorehabilitation across Aberdeen City,
Aberdeenshire and Moray.  
Following consideration the Board unanimously agreed:-  
i. to note the findings of the strategic review of the neurorehabilitation pathway; 
ii. that Aberdeen City Integration Joint Board (IJB) as host IJB for this service
implements the proposed changes to the neurorehabilitation pathway in
collaboration with Health and Social Care Moray (HSCM) and in a phased
manner as set out in section 5; 
iii. agrees that an evaluation of Phase 1 will be shared with MIJB in September 2024
before Phase 2 commences; and 
iv. to note the engagement to date with the Aberdeenshire and Moray Health and
Social Care Partnerships (HSCPs) and support the continuation of the
engagement to help ensure the redesign continues to met the needs of all three
Partnerships.  
9.         Membership of Board and Committees 
The meeting had before it a report by the Corporate Manager informing the Board of
changes to the Membership of the Moray Integration Joint Board (MIJB), Audit,
Performance and Risk (APR) Committee and Clinical and Care Governance (CCG)
Committee.  
Following consideration the Board unanimously agreed to note:-  
i. the Chair and Vice Chair are due to rotate on 1 April 2024; 
ii. the appointment of Sandy Riddell as Chair of the APR Committee from 1 April
2024; 
iii. the update regarding vacancies in National Health Service (NHS) voting
membership, noting the temporary appointment of Sandy Riddell to the CCG
Committee until such time as the new Health Board voting member is appointed,
Page 53

Page 54

and Service User Stakeholder position; 
iv. the appointment of Deirdre McIntyre as the new NHS Staff Partnership
representative; and 
v. the updated membership of the Board and Committee attached at Appendix 1.  
Councillor Williams left the meeting at this juncture.  
10.         Locality Planning Update 
The meeting had before it a report by the Interim Deputy Head of Service informing
the Board on the work done to date in relation the Health and Social Care Moray
Locality Planning model.  
Mr Riddell stated it would be useful in terms of providing assurance and
understanding the potential for transformation if evidence was available to support the
test of change in respect of successes shared across localities.  Councillor Lawrence
agreed such evidence would be useful to highlight positive examples and to evidence
change against possible savings.  
In response the Deputy Chief Officer agreed to include examples of evidence in the
report to be presented to the Board on 29 August 2024.  
Following consideration the Board unanimously agreed to:-  
i. note the progress made on locality plans since the previous report on 30 March
2023; and 
ii. agree that further progress reports be brought to the MIJB on a six monthly basis.  
11.         Lossiemouth Locality Health and Social Care Provision Update 
The meeting had before it a report by the Deputy Head of Service (Interim) informing
the Board on the progress made in relation to the development of health and social
care provision within the Lossiemouth Locality, in partnership with the local
community and practitioners.  
Following consideration the Board unanimously agreed to:-  
i. note the current position in relation to Hopeman and Burghead branch surgery
buildings; 
ii. note the request from the Cabinet Secretary for NHS Recovery, Health and Social
Care that an officer from another Health and Social Care Partnership (HSCP)
meet with representatives from Health and Social Care Moray (HSCM) to discuss
the engagement and consultation process undertaken regarding the Burghead
and Hopeman branch surgery premises; and 
iii. agrees the role of Glasgow School of Art in supporting General Practice visioning
work within Moray.    
Page 54

Page 55

12.         Carefirst Replacement 
The meeting had before it a report by the Chief Social Work Officer informing the
Board of the requirement for a replacement Social Work services client based
recording system.  
Concern was raised by a number of members of the Board on how the replacement
system would be funded.  
In response the Chief Officer advised funding streams would be part of the scoping
exercise which would be reported back to the Board.  
Following consideration the Board unanimously agreed to:-  
i. note the requirement for a replacement Social Work services client based
recording system; and 
ii. agree the initiation of a process to begin scoping a replacement system.  
13.         Reappointment of Chief Internal Auditor 
The meeting had before it a report by the Chief Officer asking the Board to consider
the reappointment of the Chief Internal Auditor, whose current terms of appointment
are due to expire on 31 March 2024.  
Following consideration the Board unanimously agreed to appoint Dafydd Lewis,
Audit and Risk Manager, Moray Council, as the Chief Internal Auditor of the MIJB, for
a further period of two years to 31 March 2026.  
14.         Reappointment of Standards Officer and Depute Standards Officer 
The meeting had before it a report by the Chief Officer asking the Board to consider
the reappointment of its Standards Officer and one Depute, whose current terms of
appointment are due to expire on 1 April 2024.  
Following consideration the Board unanimously agreed to:-  
i. formally nominate for approval by the Standards Commission, Alasdair
McEachan, Head of Governance, Strategy and Performance, Moray Council, as
the Standards Officer of the MIJB, for a further period of two years until 1 April
2026; 
ii. formally nominate for approval by the Standards Commission, Aileen Scott, Legal
Services Manager, Moray Council, for a further period of two years until 1 April
2026; 
iii. task the Chief Officer with writing to the Standards Commission with the relevant
information; and 
iv. note that the arrangements will be reviewed period to April 2026.    
Page 55

Page 56

15.         Care for People Plan - Moray Arrangements 
The meeting had before it a report by the Corporate Manager providing assurance to
the Board that Health and Social Care Moray (HSCM) have developed an operational
framework to deliver the Care for People Strategy.  
Following consideration the Board unanimously agreed to:-  
i. note that a Care for People Operational Framework has been developed in
conjunction with its partners, as set out in the operational document (Appendix A);
and 
ii. note that continued improvement and implementation of the Care for People Plan
is now business as usual.  
16.         Reserves Policy - Review 
The meeting had before it a report by the Chief Financial Officer seeking approval
from the Board on its reserves policy.  
Following consideration the Board unanimously agreed:-  
i. to approve the Reserves Policy as at Appendix 1; and 
ii. that the next review will be no later than March 2025.  
17.         Budget Update and Financial Recovery Plan [Para 6.2.1] 
The meeting had before it a report by the Chief Financial Officer providing the MIJB
with a budget update in preparation for the 2024/25 financial year, along with a
financial recovery action plan that begins to address the 2024/25 budget gap between
income and expenditure.  
Concern was raised by members of the Board that there was not enough information
in the recovery plan for a decision to be made at the meeting as the proposed
savings were not sufficiently radical or transformational to address the budget deficit
as set out in the report. 
The Chief Officer advised that a report on MIJB Scrutiny had been considered by
Moray Council at their meeting on 24 January 2024.  The Head of Governance,
Strategy and Performance confirmed that the purpose of the report was to provide
Councillors with assurance and clarification of the Council’s scrutiny arrangements
and reporting arrangements for MIJB. 
The Chair moved that a workshop be arranged with the Board and, if appropriate,
community planning partners, to discuss detailed costed options including risks and
for the outcomes from the workshop be reported back to Board for approval. 
Following further lengthy consideration theBoard unanimously agreed:-  
i. a workshop be held as soon as practicable to consider detailed and costed
options with associated risks for transformational change to address the budget
deficit; and 
Page 56

Page 57

ii. the outcomes from the workshop be reported back to the Board at the earliest
opportunity for approval in order to set a balanced budget.     
Page 57

Page 58

Page 58

Page 59

REPORT TO: MORAY COUNCIL ON 22 MAY 2024 
SUBJECT: RECRUITMENT AND SELECTION PROCESS FOR AN INTERIM
AND SUBSEQUENT PERMANENT CHIEF SOCIAL WORK
OFFICER/HEAD OF SERVICE
BY:  CHIEF EXECUTIVE AND INTERIM CHIEF EXECUTIVE 
1. REASON FOR REPORT 
1.1. To recommend the proposed approach for recruiting an interim and
permanent replacement for the outgoing Chief Social Work Officer
(CSWO)/Head of Service of the Council which is a key statutory post in the
Moray Health and Social Care Partnership. 
1.2. The report is submitted to Council in terms of Section A (1) of the Scheme of
Administration relating to the appointment of senior management posts at
Head of Service Level. 
2. RECOMMENDATION 
2.1  It is recommended that the Council: 
i) agrees to delegate authority to the Interim Chief Executive of the
Council to appointment an Interim CSWO/Head of Service in
consultation with the Interim Chief Executive of NHS Grampian, the
Chair and Vice Chair of Moray Integration Joint Board (MIJB) to
cover the period until the new permanent Chief Social Work
Officer/Head of Service is recruited and takes up post (estimated to
take approximately 6 months); 
ii) approves the progression of the recruitment process for the
permanent CSWO/Head of Service post in accordance with current
policy; 
iii) notes the indicative timeline for the recruitment and selection
process for the permanent position; and 
Item 7.
Page 59

Page 60

iv) instructs the Interim Chief Executive of the Council to report back
to the Council and MIJB on any interim appointment.  
3. BACKGROUND 
3.1 An extraordinary situation has occurred with both the MIJB Chief Officer and
the CSWO/Head of Service leaving their respective roles at the same time. 
3.2 The current Moray Health and Social Care Partnership’s Chief Officer formally
intimated that he will stand down from his role on health grounds and his
tenure as Chief Officer will end on 31 May 2024. 
3.3 Section 10 of the Public Bodies (Joint Working) Scotland Act 2014, states that
the MIJB is to appoint the Chief Officer and notes that it must consult with
both the Council and NHS Grampian. The Moray Scheme of Integration (an
agreement between the Council and NHS Grampian) states that the Chief
Officer is an employee of the MIJB and therefore the recruitment to this post is
their responsibility. 
3.4 A joint report addressing the pressing issue of the recruitment, associated
process and timescale for the MIJB Chief Officer post has been prepared by
both the Interim Chief Executive of the Council and the Interim Chief
Executive of NHS Grampian for consideration by the Board on 30 May 2024. 
3.5 The current Moray Health and Social Care Partnership’s CSWO/Head of
Service formally submitted her resignation from the role which is effective from
17 June 2024.  However, due to outstanding annual leave entitlement, her last
day at work will also be 301 May 2024, albeit the current incumbent will retain
the Chief Social Work Officer responsibility until 17 June 2024. 
3.6 In addition to the CSWO duties, and as Head of Service, the post holder is
responsible for leading the delivery of the following:
• Children and Families Social Work (including Children’s Access Team)
• Justice Social Work
• Moray Youth Justice
• Out of Hours Social Work
• Contracts
• Commissioning
• Children’s Services Networks
• Public Protection
• Child Health (Health Visiting and School Nursing) 
3.7 Section 3 of the Social Work (Scotland) Act 1968 requires every local authority
to appoint a professionally qualified Chief Social Work Officer and it is
imperative that continuity of service is secured for this statutory post. The
CSWO is an employee of the Council.  However, there is insufficient time to
Page 60

Page 61

recruit a suitable permanent candidate prior to the current incumbent’s
departure, and the recruitment process for a permanent replacement is
estimated to take approximately 6 months. 
3.8 Therefore, in the meantime, alternative temporary arrangements are
necessary to cover any potential gap in statutory provision.  Accordingly, it is
proposed that appropriate arrangements are put in place to recruit a suitably
qualified and experienced interim CSWO prior to the end of May 2024. 
3.9 The Council’s current Scheme of Delegation deals with Acting Chief Officer
Appointments, but it does not give the necessary delegated power to the Chief
Executive to appoint an Interim CSWO or Head of Service, and as a result,
formal Council approval is required to secure the appropriate delegation on
this occasion.   
3.10 It is proposed that a recruitment panel comprising the Chair, Vice Chair of
MIJB, the Interim Chief Executive of the Council and the Interim Chief
Executive of NHS Grampian (partner representative), the Head of HR, ICT
and Organisational Development is used for the recruitment of the Interim
CSWO/Head of Service.   
3.11 The recruitment process for the permanent CSWO/Head of Service will be
progressed as quickly as practicable in accordance with the Council
established policy and the permanent post will be advertised no later than
June 2024. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Partners in Care 2022-2032”
This report forms part of the governance arrangements of MIJB; good
governance arrangements will support the Board to fulfil its objectives. 
(b) Policy and Legal
The role of the Chief Social Work Officer is a statutory requirement. To
fail to make plans to appoint an incumbent Chief Social Work Officer
would result in non-compliance with the Section 3 of the Social Work
(Scotland) Act 1968. 
The National Care Service Bill is currently being progressed and will
bring further change to the Integration of Health and Social Care. The
role and remit of the Chief Officer may be subject to review to ensure it
meets the requirements of any future legislative change. Where this is
necessary, the matter will be brought to the Council’s and MIJB’s
attention. 
Page 61

Page 62

(c) Financial implications
Marginal additional costs may occur because of interim market rates
which are normally higher that the gross cost of permanent employees.   
(d) Risk Implications
As with all recruitment, there is a risk that a suitable candidate may not
be found. Ensuring a robust assessment of candidates provides
assurance for the Council that candidates are sufficiently qualified,
experienced and competent for the requirements of the role. 
(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required as there is no change
to policy and procedures resulting from this report. 
(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity implications arising from this
report. 
(i) Consultations
Consultation on this report has taken place with The Head of HR, ICT
and Organisational Development who agrees with the content in relation
to her area of responsibility. The following partners were also consulted
in the writing of this report and views incorporated: Chair and Vice Chair
of MIJB, Leader and Depute Leader of the Council and Interim Chief
Executive of NHS Grampian 
5. CONCLUSION 
5.1 This report provides a summary of key recruitment issues for the MIJB
and the resulting need to recruit an Interim Chief Social Work
Officer/Head of Service to ensure compliance with statute until a
permanent replacement is appointed. 
Author of Report: John W Mundell OBE, Interim Chief Executive
Background Papers: Health and Social Care Integration Scheme for
Moray
Ref: SPMAN-1108985784-965 
Page 62

Page 63

REPORT TO:  MORAY COUNCIL ON 22 MAY 2024  
SUBJECT:  LEARNING ESTATE PROGRAMME UPDATE - FUTURE FORRES
ACADEMY SITE SELECTION 
BY:   DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1.  REASON FOR REPORT 
1.1 To inform the Council on the site selection for the Future Forres Academy new
build project and seeks approval of the Education, Children’s and Leisure
Services Committee’s recommendation for preferred site. 
1.2 This report is submitted to Council in terms of Section III (D) (17) of the Council's
Scheme of Administration relating to the School Estate to consider and make
recommendations on capital and minor works programmes. 
2.  RECOMMENDATION 
2.1   It is recommended that Council: 
i) note the outcome of the option appraisal by the design team regarding
the location of a new school (Para 3.8-3.10); 
ii) note the outcome of the public engagement regarding the location of
a new school (Para 4.1- 4.3); and   
iii) agree the recommendation of the Education, Children’s and Leisure
Service Committee on 14 May 2024 that the Applegrove/Roysvale
Park option is the preferred site for the new school (Para 5.1 to 5.5 
3. BACKGROUND 
3.1 Following approval at the Education, Children’s and Leisure Services Committee
on 19 September 2023 (para 16 of the minute refers), a feasibility study to
support Future Forres Academy Project was instructed and undertaken by Hub
North Scotland supported by JM Architects, Goodson Associates (Civil and
Structural Engineers, Rybka (Mechanical and Electrical Engineers), Currie and
Brown (Quantity Surveyors), The Learning Crowd (Educationalists) and Ryder
(Consultation). The final report is at Appendix 1. 
Item 8.
Page 63

Page 64

3.2 In addition to new build proposals, consideration was given to refurbishment of
the current building. This would have entailed a significant cost and disruption
to the school users over a 3 year period with all or a majority of the users
required to be decanted into temporary school accommodation (in either the
school car park and/or adjacent Roysvale common good land). The study
concluded that a refurbishment option would not offer value for money and be
unlikely to meet the aspirations of the local community. It was therefore
decided to progress with a new build solution. 
3.3 A further objective of the feasibility study was to complete an appraisal of three
site options suitable for a new build school - (1) Applegrove/Roysvale (Central),
(2) Lochyhill (East) and Grantown Road (South) - against fourteen factors
weighted with respect to national policies that Moray Council are aligned with. 
This includes the National Planning Framework 4 (NPF4), local living and 20
minute neighbourhoods, climate change and reducing carbon emissions
policies. Overall project costs were not a factor considered at this stage. These
initial 3 sites options are shown in Figure 1.   
Figure 1. Potential locations for Future Forres Academy 
3.4 This scoring matrix and outcomes from the site appraisal are set out in the table
below.   
3.5 The outcome of the appraisal supported the decision to discount the 
Grantown site as a viable option. There were a number of factors contributing to
this decision not least its edge of town location (both now and in the future), the
presence of high pressure gas pipes, low voltage mains and services cables
within the site boundary and the poor transport infrastructure to and around the
site that to improve would incur significant cost.      
Page 64

Page 65

Site Appraisal Scoring Matrix 
Page 65

Page 66

3.6 It should be noted that for the design team appraisal, 30% of the score was
shared between the Context and Place criteria. This took account of the key
national and local strategies and policies as defined in  National Planning
Framework 4  and Moray Local Development Plan 2020 and adopted by
Moray to improve people’s lives by making sustainable, liveable and
productive spaces. These support 20 minute neighbourhoods, reducing car-
based and maximising active travel journeys and town centre economic
sustainability.  It was the two key criteria of Context and Place that favoured
the central location of the Applegrove/Roysvale site and scored it higher than
the Lochyhill situated on the eastern boundary of the town.   
3.7 In terms of the other criteria both sites scored equally overall – with some
criteria favouring a Lochyhill site over an Applegrove/Roysvale site and vice
versa. Both sites were considered viable options for a new build development,
with the differences between them, considered within the selection criteria,
viewed as design challenges and/or project risks and issues and not indicators
of non-viability. The following is noted as key supporting information in
determining a preferred site for construction: 
Lochyhill 
• Supports a design solution that would incorporate a new build
secondary school constructed with an associated 3G pitch and car park
on site; 
• Provides minimal design constraints and meets the education strategic
objectives; 
• Would not meet the Moray place-based policy. 
• Would see the current school demolished with the exception of the
swimming pool, hydrotherapy pool and fitness suite which would
remain as a standalone self-sufficient asset; 
• Delivers an affordable design within an area of 5.8 hectares (58,000
sqm). This would not support a requirement for future expansion - 
further land would need to be acquired to facilitate this; 
• The site is not Council owned and would need to be purchased from
the current landowners – at market rate for development land; 
• Limited flooding risk given the lower groundwater table supporting a
simpler groundworks design; 
• Site drainage not complex on site but would still require works to
connect to Forres Waste Water Treatment site to the west; 
• Requires the development of new safer routes to school: 
• Does not provide an opportunity to develop a 5-18 campus model with
existing primary school; 
• Requires road improvements  including potential requirement for a new
roundabout on the A96 to provide overall site access from the school
and future residential site; 
• Improvement and upgrade to site utility connections to meet increased
demand; and 
• Could impact local businesses due to edge of town location. 
Page 66

Page 67

Applegrove/Roysvale Park 
• Supports a design solution that would incorporate a new build
secondary school and accessible parking constructed on the new site
together with the retention and improvement of the majority of current
Roysvale Park playfields and repurposing of existing school site to
accommodate a 3G pitch, main car park and soft landscaping; 
• Meets the educational strategic objectives and place-based policy 
• Would see the current school demolished with the exception of the
swimming pool, hydrotherapy pool and fitness suite which would
remain as a standalone self-sufficient asset and the current school site
redeveloped with a 3G pitch and car park; 
• The Council owns the site for new school building; 
• Plans for the bus drop off and playing fields are on inalienable common
good land.  Its appropriation would require legal consent following a
statutory consultation;   
• Would maintain the majority of the common good as green space for
community use with mitigations planned to improve current surface
water drainage issues; 
• Options to use or improve existing safe routes to school;  
• Opportunity to develop a 5-18 campus with adjacency of existing
primary school with benefits of shared management, curriculum and
pastoral transition (mainstream and ASN), shared PEF investment and
access to extended learning for primary 
• Supports a pedestrian priority campus with a dedicated bus/coach drop
off which would avoid road congestion; 
• Provides a central location for the school with a good opportunity for a
united civic presence;   
• Provides links to other existing green/health and wellbeing spaces
providing both educational and community benefit; and, 
• Provides good opportunities for educational links during construction
and maintains the economic benefits to the surrounding businesses. 
3.8 The options for ‘future proofing’ have been considered within the options
appraisal with Lochyhill scoring higher than the Applegrove/Roysvale site.
This accounted for the fact that more land is be currently available on the
Lochyhill site as there was no existing residential property constraints. This
will change should residential development progress in the future in
accordance with the Local Development Plan (LDP).  However, there is no
allowance for this within the planned site footprint or the associated additional
land acquisition costs. School roll forecasts indicate that even with a 100%
increase on current maximum forecast housing output rate over the next 15
years (equating to 1600 new houses) the planned school capacity will be more
than adequate and no extension is foreseen. Should the situation change
there is provision within the current LDP for land to be available for a new
primary school on the wider Lochyhill development site which would allow the
Applegrove site to be considered for any future expansion of the new Forres
Academy.   
3.9 The Applegrove/Roysvale site is owned and administered by Moray Council
while Lochyhill is privately owned. The Council would need to formally acquire
Page 67

Page 68

the Lochyhill site land at market value in order to develop on it. However, a
major area of the Applegrove/Roysvale site is classed as inalienable Common
Good and hence the Council would need to remove the constraints this
imposes to allow a main contractor to commence works on site in accordance
with the programme.   
3.10 The current intended use of Common Good land is as temporary construction
site access, laydown and project ‘life support’ area for the duration of the
construction project (estimated around 32 months). This same area would be
improved to support long term use as a green playing field site within the final
school design. In addition, it is intended that a 12m landstrip adjacent to the
Sanquhar Road would be repurposed and developed as a bus drop off lane.
There are other viable design options that could be considered as alternatives
to the Common Good for this purpose (within the proposed new car park or on
Burdsyard Road to the south of the site), and although these would be further
from the new school building.   
3.11 The feasibility report concludes that if the Council is confident that the
Common Good constraint can be removed prior to the planned start of
construction on site (programmed for July 2025) then the recommendation,
based on all the selection criteria considered, is that the Applegrove/Roysvale
site would offer the best option for Moray Council to deliver a new build
school. 
3.12 Currie and Brown prepared high level cost models for each of the 3 sites as
part of the feasibility study. The estimated construction costs for each site
option have not been provided within this report due to their commercial
sensitivity; however, a comparison of additional authority costs is provided in
the table below. The additional cost to develop the Lochyhill site and
anticipated off site works is estimated at £3,372,300 above that for the
Applegrove/Roysvale site. 
Site Option  Authority
Costs 
Detail 
Applegrove/Roysvale  £4,286,500  Design and project risk allowance,
legal costs/fees, IT equipment,
furniture  
Lochyhill  £7,658,800  As above +  
Off site works: cost of land for
development, improvement to access
roads (including A96) and active
travel routes, and improvements and
upgrades to site utilities (water,
drainage, electricity).       
3.13 Given the future importance of the site selection to young people,
parents/carers and residents of Forres, it was agreed at the Special
Education, Children’s and Leisure Services Committee on 27 March 2024
(para 5 of the minute refers), to undertake a public engagement on the
location for the new Forres Academy, with two site options, Lochyhill and
Applegrove/Roysvale Park, presented.  
Page 68

Page 69

3.14 The public engagement was completed between 28 March - 25 April 2024
with the objective to share site information that was available and seek views
on the location for the Forres Academy new build. It consisted of: an online
survey and an equivalent paper version (available from the Forres Post Office
and Forres Library); an information session for Forres Academy staff and
pupils held on 17 April 2024; and a community drop in session held on 18
April 2024 at Forres Town Hall.  A copy of the online/paper survey is at
Appendix 2. 
4. PUBLIC ENGAGEMENT 
4.1 The output from the public engagement online survey is summarised below
with more detail analysis provided at Appendix 3; 
• A total of 1,191 online survey submissions were received;  
• The overall breakdown is 54.7% to 45.3% preference for the Lochyhill
site; 
• 330 respondees identified as a parent/carer of a child attending school –
the breakdown within this group was 52.1% to 47.9% in favour of the
Applegrove/Roysvale site;    
• 518 respondees were from the Applegrove PS catchment where
Applegrove/Roysvale site is located – the breakdown within this group
was 62% to 38% preference for the Lochyhill site;  
• 951 respondees were from within the Forres town boundary (Applegrove,
Andersons and Pilmuir Primary School catchments) – the breakdown of
these was 53.9% to 46.1% preference for the Lochyhill site; and, 
• The total size of the respondee groups encompassing Primary and
Secondary school pupils and staff was 131 – only the primary school pupil
group (39 respondees) preferred the Applegrove/Roysvale site (59% to
41%). The remaining secondary school pupils (51 respondees) had a
preference for the Lochyhill site (57%) over Applegrove/Roysvale (43%)
and similarly the staff (41 respondees) were in favour of Lochyhill (63%)
over Applegrove (37%)       
4.2 The output from the public engagement paper survey is summarised below
with more detailed analysis provided at Appendix 4: 
• A total of 89 paper surveys were received; 
• The preference was 85% for the Lochyhill site; 
A significant number of paper surveys were completed within the last week of
the engagement and there is clear evidence of multiple surveys with identical
content which could call into the question the validity of the results. 
4.3 During the Public Engagement process a number of questions, queries and
observations were submitted with respect to both sites. These were received
within the survey responses, as direct e-mail correspondence to the Council
and during the in person engagements. These were collated into key themes
and responses provided in the form of Frequently Asked Questions list. These
can be found on the Moray Council website at   
Page 69

Page 70

http://www.moray.gov.uk/moray_standard/page_151261.html. . The Learning
Estate team will continue to update FAQs as the new school design and
project progress. 
5. PREFERRED SITE SELECTION 
5.1 In determination of the preferred site for new build Future Forres Academy
a number of factors, and the risk and issues associated with these, were
considered. 
5.2 The feasibility report acknowledges there are a number of issues and risks
associated with developing either of the 2 sites.  The technical risks have
been identified and the civil and structure engineers appointed to the
design team have considered robust mitigation strategies that will be
confirmed during the concept design stage. The construction project costs
have incorporated a related risk contingency factor for both sites. Therefore
the key remaining site differentiators relate to land ownership status. 
5.3 The feasibility report conclusion is that if the Council are able to gain
consent to use the Common Good then the Applegrove/Roysvale site is the
best option for a new build school. The common good land transaction
would require the consent of the Sheriff Court following a Public
Consultation and due consideration by the Council. The outcome of the
public consultation will be an influential consideration but the whole
perspective on all of the process followed and issues, including any
improvements to the site for the benefit of the community will be
considered.    If the Court was to reject the application the Council would
need to purchase an alternative piece of land, which would increase the
project delivery timescales. This is an important consideration in the
context of the current condition of the Forres Academy building. Currently
an allowance of 6 months has been incorporated into the project plan
timeline. If consent is not forthcoming, and the Council need to pursue an
alternate site (Lochyhill) then this would incur a 6 month delay to the project
(moving the operational date from January 2028 to July 2028). 
5.4 With the Lochyhill site the Council would need to acquire the development
land at market rate and accept that the project costs would increase to near
£4m to cover this acquisition and significant off site development costs and
additional construction costs. 
5.5  Although there is a risk that the Council will not gain legal consent for any
use or development of the Roysvale site and this will result in a minimum 6
month delay while an alternate site is proposed (Lochyhill would be the
alternate), There may be other options on the use of the site that would
remove or significantly reduce that risk and this is being considered. There
are a number of reasons to support the selection of the
Applegrove/Roysvale site, summarised as: 
• Central location better meets the place-based and strategic context
requirements for a new community school, aligning with the NPF4 and  
Page 70

Page 71

Scotland’s Learning Estate Strategy – Connecting People, Places and
Learning guidance and principles; 
• More cost effective option at a time when the current and future
challenges on the Council capital budget are significant; 
• Retains flexibility to respond to future school roll growth if required as
the Lochyhill site is identified for a primary school; 
• Offers educational benefits of a 5-18 campus - with adjacency of
existing primary school with benefits of shared management,
curriculum and pastoral transition (mainstream and ASN), shared PEF
investment and access to extended learning for primary; and 
• Benefit of the improvement of the Roysvale land and drainage
improvement to improve community use of the green space/playing
fields for the future. 
5.6 The Applegrove/Roysvale site was proposed as the preferred development
site for the new school at the Education, Children’s and Leisure Services
Committee on 14 May 2024 and the Committee agreed to recommend to
Council for approval. 
6. NEXT STEPS 
6.1 The proposed next steps are dependent on the Council decision on 22 May
2024. It would be to either: 
A. Lochyhill: Consult regarding the relocation of the school in accordance
with the Schools (Consultation)(Scotland) Act 2010 and engage in
discussion over acquisition of the private land or;   
B. Applegrove/Roysvale - consult the public regarding the Common Good
use to support school construction for the duration of the project and for
permanent development of bus drop off areas.   
6.2 Should the Council agree the recommendation that the Applegrove/Roysvale
is the preferred site and the consent to use the Common Good ground is not
forthcoming the only viable alternate for a new build be the Lochyhill.
Therefore it is prudent for the Council to continue to consider Lochyhill as a
potential future site and engage in discussion over acquisition of the land     
6.3 In parallel with the site selection activity the project will also be progressing
with consultation on the concept design for the new school over the next 6
months.   
7 SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP) 
This report supports the aims of the Corporate Plan to: 
• Build thriving, resilient, empowered communities: Learning
estate fit for the future and financially sustainable - tackle the
Page 71

Page 72

affordability and standard of our learning estate to ensure
sustainability while meeting climate requirements. 
and supports the LOIP outcomes: 
• Building a better future for children and young people in Moray;
and, 
• Empowering and connecting communities. 
(b)  Policy and Legal 
The Lochyhill site is outside the current school boundary and therefore
consultation regarding the relocation of the school in accordance with
the Schools (Consultation)(Scotland) Act 2010 would require to be
undertaken. 
Roysvale Park is categorised as inalienable Common Good and if it is
not possible to progress an alternative site layout that avoids long term
use of the common good land, the Council would require to obtain
consent of the Sheriff Court in terms of the Section 75(2) Local
Government (Scotland) Act to appropriate the land.  Section 222(2) of
the Local Government (Scotland) Act 1973 requires the Council to have
regard to the interests of the inhabitants of the former Burgh of Forres
when administrating Common Good land. 
In addition, Section 104 of the Community Empowerment (Scotland)
Act 2015, which came into force on 27 June 2018, requires that before
taking any decision to appropriate a Common Good asset, the Council
must publish details about the proposed disposal.  In publishing these
details, the Council must also: 
(i) notify the relevant community council and any community body that
is known to have an interest in the property; and 
(ii) invite those bodies to make representations in respect of the
proposals. 
In deciding whether or not to appropriate the land, the Council must
have regard to any representations made, whether by those invited or
by some other relevant party. The proposal, along with the summary of
any representations received, would then form the basis of a further
report to this Committee to allow it to make a decision regarding the
appropriation of the site and submission for court approval. 
(c)  Financial implications 
The short term financial implications of the site selection have been
addressed within the report. 
Although the project will receive outcome based revenue funding from
the Scottish Government through Phase 3 of the Learning Estate
Investment Programme (LEIP) this is calculated against the project
construction costs and does not take account of any Authority Costs
Page 72

Page 73

outwith this which would include a site acquisition and off site
development costs.    
(d)  Risk Implications 
The majority of risks are already covered within the report. The key risk
is related to project timing delay (and associated inflationary pressures)
and apply to both site options. 
Applegrove/ Roysvale 
A currently allowance of 6 months has been incorporated into the
project plan timeline for the Applegrove/Roysvale site. If the legal
consent to use Common Good land is refused, the Council need to
pursue an alternate site (Lochyhill). This would incur a further 6 month
delay to the project (moving the operational date from January 2028 to
July 2028). 
As discussed earlier in the report the risk of non-consent could be
reduced if the final design seeks to minimise or remove the requirement
to permanently repurpose and develop the land strip adjacent to
Sanquhar Road.   
Lochyhill 
The Council would need to negotiate the acquisition of the site from the
current owner. There is a risk that the owner would be unwilling to sell,
or that the price sought would not meet affordability criteria.  With
similar situations in other projects the Council has promoted a
compulsory purchase order (CPO) in tandem with landowner
negotiations.  As part of the CPO process the Council would need to
justify its requirement for that particular site (with reference to
alternatives) and 18 months minimum would need to be allowed for this
process (moving the operational date from January 2028 - with current
6 month contingency -  to January 2029). 
Early engagement with the current landowner is required to fully
determine the likelihood of this. 
(e)  Staffing Implications 
The requirement to undertake a form of statutory consultation on either
site selection option will result in a 3-6 month increase in workload that
may require external support to ensure project timescales are met. A
legal cost factor has been included in the cost model.     
(f)   Property 
The property implications are set out in the body of the report. 
(g)  Equalities/Socio Economic Impact 
The quality of the learning environment can impact on learning and
attainment by as much as 16%.  The condition and suitability of our
learning estate, and capacity challenges associated with both growth
and population decline in some areas, give rise to unequal opportunity
across Moray. 
Page 73

Page 74

This proposal supports the Learning Estate Strategy requirement that
all Learning Estate buildings meet minimum standards and are fit for
purpose. 
(h)  Climate Change and Biodiversity Impacts 
Whichever site is chosen there will be a requirement to consider
embodied carbon within construction and whole life operational carbon
generated.  The scale of this overall impact will be assessed in detail as
the project progresses to full business case and this will be balanced
against the current operational carbon budgets. The LEIP 3 standards
for both operational carbon (energy efficiency) and embodied carbon
require the new build design to minimise carbon. A whole life carbon
assessment and community wealth building statement will be provided
during the planning application stage. 
(i) Consultations 
The Head of Governance, Strategy and Performance, Chief Financial
Officer, Acting Head of Economic Growth and Development, Equal
Opportunities Officer and Democratic Services Manager have been
consulted and the comments received have been incorporated into the
report. 
8 CONCLUSION 
8.3 The Council is requested to agree the recommendations of the
Education, Children’s and Leisure Service Committee on 14 May 2024
that the Applegrove/Roysvale site be the preferred development site
for the Future Forres Academy new build.  In supporting that decision
they are ask to consider the findings of the project feasibility report
and the outputs from the public engagement on the 2 site options.
Thereafter, a statutory consultation, dependent on the site selected
and any alternative options as set out in the report will commence.       
Authors of Report:  Shona Leese, Senior Project Officer (Learning Estate) 
Andy Hall, Programme Manager (Learning Estate) 
Appendices: 
1. SSPS Project Feasibility Report 
2. Public Engagement Survey 
3. Online Survey Results 
4. Paper Survey Results 
Background Papers: 
SSPS Report Appendix A - Consultation 
SSPS Report Appendix B - Brief 
SSPS Report Appendix C - Utilities 
SSPS Report Appendix D - Engineering 
SSPS Report Appendix E - Site Investigations 
Page 74

Page 75

SSPS Report Appendix F - Site Appraisal 
SSPS Report Appendix G -Energy Carbon 
SSPS Report Appendix H – Programme 
SSPS Report Appendix J – Cost (Commercially sensitive) – available to Councillors
on request 
Ref: SPMAN-9425411-360 
Page 75

Page 76

Page 76

Page 77

SSPS PHASE A & B REPORT  |  FEBRUARY 2024
FORRES ACADEMY
MORAY COUNCIL
“WRAPPING A BUILDING AROUND YOUR COMMUNITY”
Item 8.
Page 77

Page 78

2  •  February 2024  •  Forres Academy
FORRES ACADEMY
MORAY COUNCIL AND HUB NORTH SCOTLAND
Project:   FORRES ACADEMY
Project Code:  FOR
Project Number: 7118
Document Title:  SSPS Phase A & B Report
File Name:  FOR-JMA-XX-XX-T-A-000001
Revision:  P02
Date:   FEBRUARY 2024
www.jmarchitects.net
info@jmarchitects.net
64 Queen Street
Edinburgh, EH2 4NA
edinburgh@jmarchitects.net
t 0131 464 6100
jmarchitects
Page 78

Page 79

3  •  February 2024  •  Forres Academy
Executive Summary
This document has been prepared by jmarchitects in conjunction with Hub North Scotland Ltd., Currie
and Brown, Goodson Associates, Rybka, Ryder Architecture and The Learning Crowd on behalf of Moray
Council to summarise the Strategic Support Partnering Service (SSPS) Phase A and B work undertaken
to date on the development of the vision for a new Forres Academy.
Over the course of the last four months the project team have worked closely with Moray Council, Forres
Academy and the wider community to develop this vision which has built upon initial work undertaken as
part of the pitch book authoring for the Scottish Future’s Trust LEIP Phase 3 funding bid.
This document seeks to outline the SSPS Phase A and B work; visioning and strategy definition, existing
information analysis, development of education briefing, lessons learnt analysis, desktop appraisal of site
options, site option appraisals and recommendations as well as proposed development programme and
cost plan.
Existing Forres Academy
Page 79

Page 80

4  •  February 2024  •  Forres Academy
The Team
Participant and Authority Client
Moray Council - Education Department
Moray Council Office
High Street
Elgin
IV30 1BX
Architect
jmarchitects
64 Queen Street,
Edinburgh
EH2 4NA
Delivery Partner
hub North Scotland
Enerco House
18 Albert St,
Aberdeen
AB25 1XG
Educationalist
The Learning Crowd
9 Hemdean Road
Caversham
Reading
RG4 7SY
Landscape Architect
Ryder Architecture
Cooper’s Studios
14-18 Westgate Road
Newcastle upon Tyne
NE1 3NN
Civil and Structural Engineer
Goodson Associates
46 Carden Place
Aberdeen
AB10 1UP
Consultation Specialist
Ryder Architecture
Cooper’s Studios
14-18 Westgate Road
Newcastle upon Tyne
NE1 3NN
Mechanical & Electrical Engineer
Rybka
24 Rutland Street
Edinburgh
EH1 2AN
Quantity Surveyor
Currie & Brown
Onyx
215 Bothwell Street
Glasgow
G2 7EZ
Page 80

Page 81

5  •  February 2024  •  Forres Academy
Contents
1.0  Introduction
1.1  The Need
1.2 The Response
1.3  The Conversation
1.4 The Brief
1.5 Lessons Learned
1.6 Strategic Options
2.0  Place
2.1 Forres
2.2 A Place Specific Vision
2.3 Local Development Plan
2.4 Place Based Review
2.5 The Existing Site
2.6 Potential Locations For A New 
Community Hub
3.0  Roysvale Park
3.1 Location Overview
3.2 Historical Analysis
3.3 Photographic Survey
3.4 20 Minute Neighbourhood
3.5 Existing Utilities
3.6 Engineering Review
3.7 Existing Land Use
3.8 Opportunities
3.9 Constraints
4.0  Lochyhill / Enterprise Park
4.1 Location Overview
4.2 Historical Analysis
4.3 Photographic Survey
4.4 20 Minute Neighbourhood
4.5 Existing Utilities
4.6 Engineering Review
4.7 Existing Land Use
4.8 Opportunities
4.9 Constraints
5.0  Grantown Road
5.1 Location Overview
5.2 Historical Analysis
5.3 Photographic Survey
5.4 20 Minute Neighbourhood
5.5 Existing Utilities
5.6 Engineering Review
5.7 Existing Land Use
5.8 Opportunities
5.9 Constraints
6.0 Site Location Appraisal
6.1 Site Appraisal
7.0  Forres Academy Current Site
7.1 Location Overview
7.2 Historical Analysis
7.3 Site Analysis
7.4 Existing Building
7.5 Existing Utilities
8.0 New Proposal Site Layout Options
8.1 Roysvale Park - Long List Site Organisation 
Options
8.2 Roysvale Park - Developed Site Organisation
Option 1a
8.3 Roysvale Park - Developed Site Organisation
Option 1b
8.4 Roysvale Park - Developed Site Organisation
Option 3
8.5 Lochyhill / Enterprise Park - Developed Site 
Organisation Option
8.6 Grantown Road - Developed Site   
Organisation Option
9.0 Mechanical and Electrical
9.1 Energy and Carbon Strategy
9.2 Mechanical and Electrical Design Strategy
10.0  Structural and Civil
10.1 Structural Strategy
10.2 Civil Strategy
11.0  Programme
11.1 Programme Commentary
12.0 Cost Appraisal
12.1 Cost Commentary
13.0 Recommendations and Next Steps
13.1 Recommendations
13.2 Next Steps
14.0 Appendices
Appendix A  - Consultation Summary
Appendix B - The Education Brief, Adjacencies 
& Schedule of Accommodation
Appendix C - Existing Utilities Report
Appendix D - High Level Site Constraints Report
Appendix E - Site Investigations Report
Appendix F - Site Appraisals Assessment
Appendix G - Energy & Carbon Strategy
Appendix H - Programme
Appendix J - Cost Appraisal
Page 81

Page 82

INTRODUCTION1.0
Page 82

Page 83

7  •  February 2024  •  Forres Academy
1.1 The Need
The Strategic Fit
There is evidence that attainment and post-school
destinations vary across Moray communities and
in some areas are below average. Investment in
the learning estate will respond to these issues and
support the aspirations of the wider community.
The Moray Council Learning Estate Strategy 2022-
2032 aligns with the local priorities set out within
the Local Outcome Improvement Plan (LOIP) and
the Moray Council Corporate Plan. A future school
will align with what is expected of infrastructure
for the future and offer sustainability for both the
asset and communities they serve; enabling
multi-organisational working to ensure that public
services are joined up and resources are used
most effectively.
Existing Condition and Suitability
Following the criteria outlined by the Scottish
Government’s Condition Core Facts Survey, Forres
Academy was assessed as overall Condition D –
life-expired and/or at serious risk of imminent failure.
There is a trend of increasing reactive maintenance
spend on the existing asset and a rising sum of
investment required to make much needed fabric
improvement. Considerable sums have already
been spent over the last few years and these
have only maintained the low condition ratings
and indeed not prevented further deterioration in
condition.
The current Forres Academy, which originally
opened in 1969, was designed for an earlier
approach to educational provision and no longer
reflects the needs of the community for the
integration of education, skills and jobs that will
support long-term resilience and sustainability.
The continued drain on resource to simply maintain
the current Forres Academy at low condition and
suitability standards in unsustainable.
RAAC
Following updated guidance regarding reinforced
autoclaved aerated concrete (RAAC) from the UK
Government in late 2022 Moray Council conducted
desktop reviews of their whole building estate,
including 54 schools. This progressed to a physical
investigation in a number of buildings over the
summer of 2023, which confirmed that there was
RAAC present in the flat roof structure of Forres
Academy.
Page 83

Page 84

8  •  February 2024  •  Forres Academy
1.2 The Response
In November 2022 Moray Council announced
that Forres Academy was listed as its priority
school to receive the Scottish Government
Learning Estate Improvement Programme (LEIP)
3 funding. Consultation and engagement work
was undertaken to prepare a ‘pitch book’ outlining
the strategic case for funding for a new Forres
Academy and the Scottish Government indicated
that they would consider LEIP 3 funding bids with
RAAC in mind.
Moray Council’s Education, Children’s and Leisure
Services Committee decided on Tuesday 19th
September 2023 to progress Forres Academy
quicker by accelerating the Outline Business Case
approval and to bring in external consultants (‘the
project team’) to move the initial stages on to be as
ready as possible when any funding announcement
is made.
On 30th October 2023 the Scottish Government
confirmed that the funding bid for a replacement
Forres Academy had been successful.
Over the course of the last four months the project
team have worked closely with Moray Council,
Forres Academy and the wider community to
develop a vision which has built upon the initial work
undertaken as part of the pitch book authoring.
Page 84

Page 85

9  •  February 2024  •  Forres Academy
1.3 The Conversation
Design Charrettes
As part of the engagement programme for Forres
Academy, two sets of design charrettes were held
on 4th and 14th December 2023. Charrettes are
a collaborative and hands-on way to engage with
stakeholders who may not have decision-making
influence over a project, but often have a wealth
of knowledge, interest and enthusiasm as they
represent the end users of the building and/or the
wider community in which it is set.
Our charrettes were attended by three groups:
staff from the existing school; pupils from the
existing school; and community / elected members
including parents and carers of current pupils. On
the first day, each group was given an overview of
the project context before completing exercises
focusing on shared and large spaces, such as
the grounds and approach to the school, sports
facilities, dining, assembly and drama. Each group
lasted approximately one hour.
The second charrette was attended by staff and
pupils only, as it focused on core spaces such
as classrooms, breakout space, circulation and
flexible working spaces, which are not typically
accessed by members of the public.
The methodology was consistent across each
charrette. Attendees were split into small groups
of around five to eight people, and a member of
the client or design team sat with each group to
facilitate discussion and take notes. The groups
were presented with precedent images from
existing schools, each page addressing a different
type of space, and were invited to put coloured dots
on the images to indicate their likes and dislikes.
This was used as a prompt for further discussion
to capture qualitative feedback on what could work
in the new school, and what may not work so well.
It also gave the team an opportunity to ask why
people held certain preferences – for example:
personal preference / taste; concerns about
safety, capacity, functionality, etc; or simply being
presented with something new or different that
may take time to get used to. This helps to assess
the feedback in more depth and understand more
about the aspirations and culture of the school.
Key themes included:
• Safe access routes to the school for pedestrians,
reduced congestion from cars and buses, and
supporting active travel where possible
• A well-defined entrance which clearly displays
the name of the school, and has sufficient width
to avoid bottlenecks at the start and end of the
day
• Shelter, seating and activity space to make the
most of the outdoors
• Larger spaces such as assembly, performance
and dining should work hard and be multi
purpose / flexible where possible. However,
the design should ensure that flexibility, noise
and adjacent circulation spaces do not distract
from their function
• The school should be welcoming, light and
bright, accessible and inclusive
• Sports provision should be a community asset,
offering a range of sports and the ability to use
facilities out of school hours
• Whilst pupils are not encouraged to loiter in
the school during lunch and breaks, there
is a desire for more social spaces and areas
where both staff and pupils can relax or work
in comfort
• Classrooms and breakout spaces should be
as bright and spacious as possible, with good
storage. There is a desire for robust furniture
that will not easily break
• In spaces used for flexible working, breakout
and socialising, attendees strongly favoured
images showing different types of furniture
which could support a variety of learning
styles and types of work. This includes quiet /
individual spaces or small booths through to
larger spaces for collaborative work in bigger
groups
A full report of the charrette findings, including key
themes and feedback from each group on each
space type, is included in Appendix A.
Partner Survey
In December 2023/ January 2024, a short online
survey was sent to potential partners who may
wish to use working space or community facilities
in the school, to begin dialogue about what their
requirements may be. To date, four responses
have been received from Scottish Ambulance
Service, NHS Grampian (x2) and Police Scotland.
There has been a request for space from the latter
two services, including dedicated space, drop-
in desks, collaboration space, meeting rooms
and a treatment room for the nurse when visiting.
Other considerations include the ability to have
confidential meetings / calls, secure storage and
parking for operational vehicles. For partners, the
benefits of shared facilities include being more
visible and available to pupils and the community,
and more joint working opportunities with other
partners to improve service delivery overall.
Page 85

Page 86

10  •  February 2024  •  Forres Academy
1.4 The Brief
The Education Design Brief sets out the proposal
for a new building for Forres Academy. The
‘Learning Village’ will provide high quality, flexible
and future-proofed spaces for 1200 pupils and
40 ASN pupils in a non-denominational six year
secondary school. The total proposed GIFA for the
project is 14,520m2.
The term ‘Learning Village’ is used here to show
that this is a new type of campus that is designed
specifically to a set of agreed Moray Council
principles that will maximise the use of the learning
estate now and in the future.
The brief demonstrates how the project will deliver
national and local priorities, in particular :
• National Policy including the Learning Estates
Strategy and National Improvement Framework;
• Moray Council Learning Estate Strategy 2022-
2032; and
• The Forres Academy Vision, Values and Aims.
The Education Design Brief has been developed
closely with Moray Council and Forres Academy
Senior Leaders and involved engagement with
school stakeholders including staff, pupils, parents
and community representatives.  It takes account
of their aspirations but is grounded in ensuring the
project :
• Delivers the Scottish Futures Trust Space
Standards and is within cost metrics for a
project of this size;
• Sets clear Strategic Objectives and success
measures that provide a framework for delivery
and for monitoring impact;
• Takes account of the school context in terms
of curriculum, ways of working, pastoral care
and additional needs, partner services and
community use.  At the same time, it ensures
flexibility and future-proofing to meet long term
needs; and
• Has a set of overarching education design
objectives that will translate into agreed
adjacencies and an accommodation schedule
that ensure clarity about the purpose and
requirements of the spaces.
It also draws on Post Occupancy Evaluations
of recent Moray Council education projects at
Lossiemouth High School and Elgin High School
and from visits to other new community schools.
The Education Design Brief and proposed Schedule
of Accommodation can be found in Appendix B.
Page 86

Page 87

11  •  February 2024  •  Forres Academy
1.5 Lessons Learned
A “Lessons Learned” workshop was held on 25
October 2023 (Lossiemouth, Elgin High School +
Linkwood Lessons Learned Summary Paper was
referenced), and those attending the workshop
talked about experiences learned from construction
projects in general, and not just specific schools.
From the workshop, a number of key points were
raised and discussed which are summarised
below:
• The requirement to do Site Investigation works
at the earliest opportunity was discussed.
• It is important to get early FM involvement – the
internal team from MC needs to be signed up
to the project early on, in design stages as well
as in construction.
• Pitched roofs would be preferable to flat
roofs where possible/applicable albeit it is
understood that it is not always the more cost-
effective solution.
• Design to minimise damage caused by seagulls
on flat roofs and in particular protecting exposed
insulation on pipework or similar.
• Careful design is required whereby access to
ceiling voids is required to make sure a robust
solution is put in place, especially where regular
maintenance inspections required, in corridors
for instance.
• There is a preference not to have ceiling tiles in
classrooms.
• Exposed trunking is probably the best solution
for IT/electrical outlets within classrooms
however vertical drops should be kept to a
minimum.
• When designing lamps/lighting in atrium’s,
consideration should be given as to how
maintenance is to be carried out and where
possible avoiding the use of scissor lifts.
• An important appointment pre contract is the
Tier 1 Design Manager, and preferably someone
with experienced in education projects should
be appointed where possible.
• Any Value Engineering changes required
should be fully broken down to allow evaluation/
scrutiny by the Cost Manager
• Any VE changes that are proposed should
consider all long-term considerations for the
participant particularly in terms of ongoing
maintenance requirements.
• There is continued debate whether MVHR units
in classrooms is a preferable solution opposed
to centralised plant. Careful consideration
is required as to the long-term maintenance
requirements and not just initial capital costs,
and full consideration of associated costs
needs to be scrutinised including increasing
building heights, increased GIFA for service
risers etc. Participant/FM team need to be
consulted also.
• FF&E coordination required to ensure account
taken of items such as surface mounted pipe
drops or surface mounted conduit etc. Consider
use of independent FF&E consultant as part of
design team.
• Window opening systems need to be carefully
designed and also take account of potential
furniture layouts that might affect access.
• Care is needed with RDD reviews as this needs
to occur before Financial Close where possible.
• Clarity is required as to what elements of M&E
are CDP and what is M&E consultant designed.
• A careful review of the benefits versus costs of
“fibre to the room” is recommended.
• Early engagement with insurers “Zurich”
is recommended to obtain clarity on the
final specification of sprinkler heads within
classrooms and what protection is required.
• Careful programming is needed at tender
package reviews stage to ensure adequate
time is allocated for fully assessing tender
returns and reviewing alternative solutions.
• Market testing period in programme needs to
be sufficient to allow Tier 1 risk allocation to be
reduced if appropriate.
• Tier 1 supply chain needs to be thoroughly
tested at Tier 1interview stage.
• ACR’s require thorough review including
aspects including adjacencies for instance.
• Consideration should be given early on in the
design process as to what public (community
use) access required, and to which parts of the
building to assist in design of access control,
security strategy, lockdown strategy and CCTV
monitoring.
• There does not seem to be a standard
approach within Scottish schools as to the
design/layout of WC’s; consideration should
therefore be given to reviewing new schools
that are constructed and in operation to see
which layouts function best. 
• Head Teacher involvement in school design is
welcome and necessary however consideration
should also be given to layouts generally on
newly built schools to see what functions and
layouts work well.
• Design and specification to mitigate wall scuffs
(shoes/heels as well as bags), corner protection
to be carried out pre contract, including anti-
graffiti material specification.
• Colours for interior design is subjective,
however participant should review other newly
built schools for inspiration. 
• Flexibility for future changes in partitions should
be considered at design stage including
potential for including mullions at strategic
points within the frame.
• Car parking needs to take account of potential
community use as well as day to day school
use.
A number of the above points raised suggested
that much could be learned from visiting newly built
school projects. To this extent, jmarchitects were
able to assist representatives from Moray Council
on a number of site visits to new schools in the
Central Belt giving the participant the opportunities
to consider alternative design solutions to some
of the points raised in the above. The following
schools were visited on 20th and 21st November
2023:
• Jedburgh Intergenerational Campus
• Castlebrae Community Campus
• Wallyford Learning Campus
Lossiemouth High School
Elgin High School
Page 87

Page 88

12  •  February 2024  •  Forres Academy
1.6 Strategic Options
In additional to the new build design proposals
contained within this SSPS Report, Moray Council
also explored the following two options in relation to
the existing Forres Academy building: ‘do nothing’
and ‘refurbish and extend’.
‘Do Nothing’
The Forres Academy building is assessed as overall
Condition D – life-expired and/or serious risk of
imminent failure.  The current school was designed
for an earlier approach to educational provision
and no longer reflects the needs of the community
for the integration of education, skills and jobs that
will support long-term resilience and sustainability. 
There is a trend of increasing reactive maintenance
spend on the existing building and a rising sum of
investment required to make much needed fabric
improvements. 
Considerable sums have already been spent over
the last few years and these have only maintained
the low condition ratings and indeed not prevented
further deterioration in condition.  The continued
drain on resources to simply maintain the current
Forres Academy at low condition and suitability
standards is unsustainable.
Refurbish and Extend
Moray Council commissioned a high-level
appraisal of Forres Academy in 2023 to ascertain
whether it would be practicable and cost effective
to refurbish and extend the existing school
building. As part of this exercise several key criteria
were considered including: the existing condition
of the school premises; LEIP 3 compliance; any
challenges that a refurbishment scenario may
present including functionality and quality issues;
whole life carbon; and cost implications. Whilst
a refurbishment scenario can meet a number
of the LEIP 3 requirements, two issues present
significant if not insurmountable challenges;
the existing span between the structural floor
slabs (which is significantly less than in modern
education facilities) would pose a challenge with
the mechanical ventilation required to meet LEIP
3 as well as the probable requirements to insulate
under the existing ground floor slab.
Based on benchmark data the construction cost to
refurbish a school is generally around 90% of the
cost of a new build however the additional costs
pertaining to the Forres Academy project, such as
temporary accommodation for decant, the extent
of RAAC and concerns over fire engineering would
mean that the cost for delivering a refurbished
Forres Academy would be likely to exceed the cost
for delivering a new build Forres Academy with the
risk that the final building could be compromised
in some aspects.
Conclusion
One of Moray Council’s learning estate strategy
aspiration and key drivers is that “All learners to be
educated in high quality buildings (minimum level
B for condition and suitability)” given the financial
challenge of simply maintaining the existing building
without ever being able to improve its condition it
would not be acceptable to ‘do nothing’ at Forres
Academy.  When consideration is taken of a
compromised design solution that may have to be
accepted for a refurbished school in comparison
to a new build without any cost benefit, it was
concluded that a refurbishment solution would not
offer good value for money to Moray Council and
the end product would unlikely meet the aspirations
of the local community. It was therefore decided
that Moray Council would proceed with a new build
solution for the replacement Forres Academy.
Existing Forres Academy
Page 88

Page 89

PLACE2.0
Page 89

Page 90

14  •  February 2024  •  Forres Academy
The town of Forres is located within the council
of Moray, approximately 26 miles east of the city
Inverness.
The town is also geographically close to the towns
Elgin, Nairn, and Burghead as well as Findhorn,
Auldearn and Kinloss.
The first historical indication of the existence of
the town may be that shown as Varis on a map.
It is suspected that “Forres” may be derived from
this or a combination from the Gaelic words “fo”
(below) or “far” (where) and “ras” (underwood).
INVERNESS
FORRES
ELGIN
2.1 Forres
The town of Forres in its wider context with the surrounding towns and cities
Page 90

Page 91

15  •  February 2024  •  Forres Academy
Forres has a deep-rooted history dating back
centuries, with its burgh charter granted in 1153.
This historical backdrop is reflected in heritage
assets like Sueno’s Stone, an ancient Pictish
monument.
While the town has historical ties to trade and
industry, notably in textiles and brewing, its
contemporary identity is shaped by the acclaimed
whisky production.
The bustling High Street, with various elements of
history and portrayed throughout, stands as the
heart of the area and define Forres’ connectivity
and community.
In addition to its architectural and historical
significance, Forres prioritises community and
recreational facilities. The town hosts various sports
amenities, with golf courses at its periphery, and
community centres that foster social engagement.
Forres demonstrates a commitment to preserving
its heritage, fostering community bonds, and
offering recreational spaces that enhance the
quality of life for its residents.
2.1 Forres
Overview of the town of Forres
Page 91

Page 92

16  •  February 2024  •  Forres Academy
2.2 A Place Specific Vision
It is important to provide a school which is both
physically stitched into the fabric of Forres and
reflects what is important to the town; a true
community hub which is developed for, used by
and owned by the people of Forres.
The school should allow young learners to become
better learners, grow values, develop skills and
enhance the community whilst also reinforcing the
values of effort, respect and ambition. The school
will facilitate high quality learning and teaching
that leads to improved levels of attainment and
achievement and creates an environment which
enables the development of leadership skills at all
levels.
The building should form a strong connection to its
immediate external environment and that beyond
its site boundaries to encourage community
engagement, develop and enhance inclusive
practice and improve partnerships and family
learning.
Page 92

Page 93

17  •  February 2024  •  Forres Academy
© Crown copyright [and database rights] 2018 OS 100023422 Moray Council
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
Settlement boundary
Town centre boundary
Green spaces (including wetlands)
Core retail areas
Conservation areas
Flood alleviation areas
Residential designated areas
Long term residential designated areas
Mixed use designated areas
Industrial/business designated areas
Business park designated areas
Mixed use designated opportunity areas
CRA
2.3 Local Development Plan
Forres Local Development Plan Map, courtesy of Moray Council
The policies for development of the area in and
around Forres are covered by the Moray Local
Development Plan 2020 and provides guidance on
how the Council sees the area developing over the
next 10 years.
The Local Development Plan (LDP) identifies that
development proposals must reflect the traditional
settlement character in terms of siting and design.
It also states that design should enhance Forres’
distinctive built heritage and the integrity of the
Conservation Area.
The LDP notes the requirement of long term growth
areas, including new neighbourhoods at Ferrylea,
Lochyhill and Dallas Dhu which would aid in
supporting and enhancing the vitality and viability
of the town centre.
The LDP states the necessity for an additional 12ha
of land for employment and support proposals
for business development, which in turn would
supplement the proposed new neighbourhoods.
The LDP also recognises the importance of
protecting and enhancing the existing network of
open and green spaces and to identify a network
of new park and play areas within the development
boundary of Forres.
Page 93

Page 94

18  •  February 2024  •  Forres Academy
2.4 Place Based Review
Place is a key pillar of public policy and investment
in Scotland. A place-based approach is about
joining up infrastructure, services and partnerships
to better meet the needs of local communities;
providing better opportunities and improving
the impact of combined energy, resources and
investment.
During SSPS Phases A and B, Moray Council and
the Design Team commenced engagement with
the existing school, stakeholders and the local
community and partners in Forres. A 20 minute
neighbourhood study was undertaken on the three
site options; looking at both Council and partner
assets.
The three sites have also been assessed against
Moray Council’s Strategic and SMART Objectives.
A community event was held at the end of October to
present and discuss the 20 minute neighbourhood
analysis and strategic assessment outcomes. A
survey has been issued to blue light services with
responses received from Police Scotland, Scottish
Ambulance Service and NHS; it is also proposed
to re-issue the survey to a wider pool of partners.
As part of the wider North Schools Programme,
Moray Council propose to work alongside Hub
North Scotland and the other participants to further
develop the Place Based Review.
1
2
3
45
6
7
8
1. Why should we use a 
Place-Based approach?
Agreeing the need to tackle complex
challenges in places collectively
2. What do we want this
approach to achieve 
and why?
Agreeing the intended benefits of a
collaborative approach
3. How will we work
together in this place to
realise these benefits?
Agreeing ways of collaborative
working and resourcing as partners
and with communities
4. Understanding why the
place needs to change?
Meaningful engagement with communities
and partners to confirm needs and
priorities for action
5. What should the 
future be?
Collaboratively agreeing what success
looks like and how to get there
6. What are the
opportunities to deliver
on the place ambition?
Focusing on making the best of
what exists and influencing future
resource decisions
7. How do we work
together to deliver the
future place?
Agreeing a co-ordinated
programme of implementation
8. How to we ensure sustained 
success across time?
Connecting the place ambition with project 
briefs, gateway reviews and outcome evaluation
The Place eight-stage process
Page 94

Page 95

19  •  February 2024  •  Forres Academy
2.5 The Existing Site
The existing Forres Academy site is split into two
areas. The main site lies adjacent to Roysvale
Park, is bisected by the Mosset Burn and occupied
by the school buildings, Forres Swimming and
Hydrotherapy Pool, car parks and other external
hard and soft sports pitches. There is also a
satellite site to the south, accessible by footpaths
from the main site which contains additional grass
playing fields. 
School - Guidance
The School Premises (General Requirements and
Standards) (Scotland) 1967 states:
The area of site for a 1121 pupil secondary school
(current pupil capacity) shall not be less than 6.5
acres (2.63 hectares), excluding sports pitches,
roads, pathways and areas not generally suitable
for use as school grounds.
The area of pitches for a 1121 pupil secondary
shall not be less than 9 acres (3.64 hectares).
Total required site area, according to The School
Premises (General Requirements and Standards)
(Scotland) 1967 is 15.5 acres (6.27 hectares).
School – Site
The existing Forres Academy site is approximately
7.96 hectares.
School - Footprint
The existing Forres Academy footprint is
approximate 10,100sqm/ 1.01 hectares (not
including the swimming or hydrotherapy pools).
Existing school site boundary and the wider settlement boundary
Page 95

Page 96

20  •  February 2024  •  Forres Academy
Roysvale Park & Existing Site 6.1 Ha
Potential locations for new Academy
2.6 Potential Locations for a New Community Hub
Lochyhill / Enterprise park       5.8 Ha
Grantown Road         5.9 Ha
Forres Settlement Boundary
Potential locations to accommodate school
Moray Council has engaged with Hub North
Scotland and a Design Team to begin work on
designs for a new Forres Academy.
One of the first steps was to decide where the new
school should go. From a list of five possible sites,
three have been short-listed as suitable locations
for the new Forres Academy (Roysvale Park,
Lochyhill and Grantown Road).
Following the creation of this short-list, a more
detailed site analysis and appraisal has been
carried out for the three potential locations.
The design team has also been able to assess
the various sites against the project’s strategic
objectives.
1
2
3
1
3
2
Page 96

Page 97

ROYSVALE PARK3.0
Page 97

Page 98

22  •  February 2024  •  Forres Academy
3.1 Location Overview
Roysvale Park site within the context of Forres
Page 98

Page 99

23  •  February 2024  •  Forres Academy
Forres is one of the oldest of Scotland’s royal
burghs with the charter granted in 1153. In the 12th 
century, Forres, along with Inverness, Auldearn,
Nairn and Elgin formed part of a defensive chain
along the south coast of the Moray Firth.
Throughout the 15th and 16th centuries, Forres
thrived as a market town, capitalizing on its
strategic location and burgeoning trade networks.
By the 18th and 19th century, the site still remained
largely untouched. However the main town,
particularly along the High Street, began to rapidly
develop and became commercially and socially
significant for the area.
During the late 19th century and mid-20th century,
the towns growth continued, expanding away
from the High Street and particularly along Burn
of Mosset, with new roads and public footpaths
appearing, allowing new housing and amenities to 
emerge.
Roysvale Park
There has been a primary school on the ground
adjacent to the park since the mid 20th century and
has been expanded several times to accommodate
the requirements of modern education.
The park has remained largely untouched since
transitioning into a public space in the 19th century.
3.2 Historical Analysis
c1870
c1970 c2023
c1930
Page 99

Page 100

24  •  February 2024  •  Forres Academy
View of the Roysvale Park site looking north
3.3 Photographic Survey
St Laurence
Parish Church
Roysvale
Park
Applegrove
Primary
School
Page 100

Page 101

25  •  February 2024  •  Forres Academy
3.3 Photographic Survey
Aerial view of the Roysvale Park site
Applegrove
Primary
School
Roysvale
Park
Forres
Academy
Forres
Bowling Club
Forres
Community
Fire Station
Page 101

Page 102

26  •  February 2024  •  Forres Academy
3.4 20 Minute Neighbourhood
Roysvale Park is located slightly to the south, whilst
still remaining quite central, to the majority of the
towns facilities.
Several community and amenity facilities are
in close proximity to the site, such as the Forres
Swimming Pool and Fitness Centre which adjoins
to the existing school building. There are also
several green spaces and public parks which are a
10-20 minute walk from the site.
Various food retailers are located along the town’s
High Street, as well as two supermarkets, Spar and
Co-op, which are both, approximately 10 minute
walks from Roysvale Park. A larger supermarket
- Tesco - is along Nairn Road, which adjoins the
High Street and is approximately a 16 minute walk.
The main public transport network for the town, the
bus service, has several services and routes which
are nearby to the site. The train station is to the
north of the site and is a 17 minute walk.
KEY
Forres Academy1
3
4
9
Anderson’s Primary School
Applegrove Primary School
Schools
Pilmuir Primary School
Healthcare & Emergency Services
Forres Health & Care Centre1
2
3
Forres Community Fire Station
Forres Police Station
Community & Sports Facilities
Swimming Pool & Leisure Centre
Forres House Community Centre
Forres Town Hall
Forres Tennis Club
1
3
7
5
9
10
11
12
2
4
8
6
Forres Mechanics Football Club
Forres St. Lawrence Cricket Club
Forres Bowling Club
Grant Park Bowling Club
Forres Golf Club
Forres Squash & Fitness Club
Forres Area Soccer 7s
Forres Thistle Football Club
1
2
3
4
5
7
8
9
10
Parks & Green Spaces
Grant Park
Cluny Hill
Sanquhar Loch & Woodlands
Mannachie Park
Roysvale Park
Fleurs Park
Thornhill Playing Field
Pilmuir Playing Field
Mosset Burn Park
Bogton Road Park
Academy Playing Field
11
13
Map showing the public amenities in relation to Roysvale Park © Crown copyright [and database rights] 2023 OS AC0000806936 Moray Council.
Key
Site boundary
Proposed location
Buffer
0-5 minute
5-10 minute
10-15 minute
15-20 minute
Bus routes
54
4
1
1
13
3
4
1
8
99 2
107
7
3
2
5
11
10
6
1
11
8
3
10
3
2
9
12
3
Page 102

Page 103

27  •  February 2024  •  Forres Academy
3.5 Existing Utilities
Record drawings indicate that the proposed
Roysvale Park site is clear of Electrical, Gas, Mains
Water and Communications utilities infrastructure.
The utilities for the proposed new development
would comprise of Electric, Mains Water and
Communications Infrastructure. Records show that
existing infrastructure for each of these services
are located in close proximity to the site.
Utility capacities and the ability for local
infrastructure to serve the site without significant
network reinforcement will be confirmed as the
design develops and applications are made.
Notwithstanding that we believe the Roysvale Park
site presents the option with least risk on the basis
that the capacities associated with the existing
school will be removed from the infrastructure
locally and can be assigned to the proposed new
school development.
The record drawings received will be verified
through a Ground Penetrating Radar Survey
(GPRS) during the next stage of the project should
the site be selected as the preferred option.
With regard to drainage, the surrounding network
is a fully combined system. A Pre Development
Enquiry has been submitted to Scottish Water to
establish if sufficient capacity exists to allow for
both surface and foul water to be discharged to
this network. In the event that there is insufficient
capacity for the surface water, it should be noted
that an offsite connection to the Burn of Mosset
may be required.
Within the site boundary a 225mm drainage tail
exists running north/south. It is understood that this
redundant, however CCTV works will be required
to confirm. Additionally, a below ground surface
water storage trench exists to the boundary with
Applegrove Primary School. This is identified on
the constraints plans provided.
For further details and utility record drawings
please refer to Appendix C.
Page 103

Page 104

28  •  February 2024  •  Forres Academy
3.6 Engineering Review
Earthworks and Site Levels
Existing Site Topography
The topographical survey was undertaken by
Douglas Land Surveys Ltd in November 2023.
The data shows minimal level change throughout
the site, there is a 3m level change from south to
north, undulating between 14mAOD and 12mAOD.
Proposed Levels and Cut / Fill Strategy
In general, the existing topography is relatively flat,
the site falls gently to the north, however, there is a
slight valley in the levels through the centre of the
field.
The FFL of the proposed school will require to
be 600mm above the 1:1000 year flood level,
which will need to be demonstrated through a
detailed flood risk assessment. However, based
on an initial assessment the building footprint and
surrounding areas will need to increase in level by
approximately between 400mm and 1.6m above
existing topographical levels. At this stage it should
be assumed that this will require to be built up with
imported engineered fill.
Any water which is displaced by proposed
development, up to the 1 in 200 year event, will
need to be stored within the site boundary through
a compensatory flood scheme. An area has been
identified within Roysvale park, where levels will be
shaped to ensure that flooding is controlled and
no additional flooding outwith the site boundary
occurs due to the development.
The current earthworks strategy allows for an
approximate compensatory flood water volume
of 5000 - 7000m³. The area identified to act as
compensatory storage is displayed by the blue
hatch in Figure 1, however this will be further
developed though detailed flood modelling.
It should be noted that this flooding will be a rare
event, and will not prevent the day to day use of
this space outwith these extreme weather events.
Furthermore, the current earthworks model
highlights that 8000m3 engineering fill is required
under the building footprint. However, there is a cut
fill balance within the remainder of the site.
Retention and Levels
Due to the requirements for compensatory storage
and raising the finished floor level of the school,
areas for low level retention and banking will be
required in the design.
Resolving this level difference can be
accommodated in a number of ways, and through
careful consideration of the layout and landscape
design this can be included in such a way as to not
act as a constraint. 
Transportation/ Parking
Subject to agreement with the roads department,
the proposed main entrance location is proposed
to be located along Orchard Road.
Locating accessible parking at the front entrance
makes sense from user access requirements, it
does present difficulties in terms of managing the
parking to prevent misuse of the spaces and will
need to be considered carefully in the next stage
of design. 
To further understand the traffic and parking
patterns in the local area, parking surveys will be
required to inform any future planning application.
Initial discussions regarding the scope of these
have been undertaken with Moray Council.
Figure 1. Proposed Area of Controlled Flooding During 1 in 200 year event Figure 3. Moray Council Adoption Plan
Figure 2. Image from site walkover
Page 104

Page 105

29  •  February 2024  •  Forres Academy
Geotechnical Review ans Site Investigation
During the feasibility stage we have carried out
an initial desktop review of the prevailing ground
conditions on the site, taking cognisance of
both BGS records and historic site investigation
information from the surrounding area. This was
followed up by a detailed site investigation the
site works for which were completed in November
2023.
Previous land use
A review of the 1830-1880 historic map shows
that the site was previously used for agricultural
purposes. No major structures were recorded
within the site boundary prior to the construction of
the school. See Figure 4.
The primary school – Applegrove Primary - within
the site boundary was officially opened in the
1950s.
From previous land use, the assumption is that
overall risk of contaminants is low, however, results
from the SI report will clarify the presence of
contaminants. 
It is assumed the current primary school building
envelope will contain asbestos contaminants. An
asbestos register will be required to address this
fully. 
Geology
From the recent site investigation works, borehole
information generally shows a sand and gravel
strata below a layer of topsoil. See Figure 8.
The lithological description from the British
Geological Survey is gravel, sand and silt which
further corroborates the borehole information.
The Coal Authority GIS database identified that the
site is not within an area coal mining reporting or
where coal outcrops are present. Based upon this
information, it is concluded that coal mining will not
affect the proposed development.
Foundations
The ground conditions on-site should, mostly,
allow for conventional solution using an allowable
bearing pressure of 150kPa. Further confirmation
of this value will be received within the full SI report. 
However, the foundation solution will have to be
investigated further to the north east of the site,
within the pink hatch in Figure 9. The ground
conditions between WS01 and CP01 will not
support a shallow foundation solution and localised
ground improvement may be required in this area.
Based on 2000kN maximum column load the
allowable bearing pressure of 150kPa would
lead to relatively large pads, furthermore, there is
a looser stratum of silty sand (WS02-05) around
2.3-3.1mbgl which will need to be considered in
the settlement calculations once the location and
levels of the proposed foundation and loads are
understood.
An additional point of note is the presence of a
very localised poorer deposit at 2mbgl at WS12,
see Figure 9. However, as this is out with the area
of the current development proposals, this is not
considered to be a constraint. 
Figure 4. Extract from 1830-1880s historical map
Figure 6. 2004 Aerial view
Figure 5. Extract from 1900s historical map
Figure 7. 2023 Aerial view
3.6 Engineering Review
Page 105

Page 106

30  •  February 2024  •  Forres Academy
Groundwater
The preliminary boreholes show that the water
table varies from 0.69-1.96mbgl. Instantaneous
recharge is noted which indicates that standing
water table is present. Further examinations are
ongoing to log these levels.
Based on this, it is likely that the contractor will
encounter ground water during foundation and
drainage excavations, and an allowance for
dewatering should be considered as part of any
cost appraisal.
Radon
A review of UK Radon mapping has indicated
that the site is within an area of 1% of homes are
affected by Radon. Therefore, based upon this
dataset and in accordance with BRE 211(2015),
the minimum level of Radon Protection is required
for any future development at the site.
Ground gas risk
A full ground gas risk assessment is being prepared
as part of the detailed site investigation. For this
site, the primary potential sources of ground gas is
considered to be:
• Potential generation and migration of ground
gas (primarily carbon dioxide (CO2) and
methane (CH4) attributable to microbiological
decomposition associated within organic rich
soils and strata.
Further considerations to these potential sources
also depend on the potential for significant volumes
of ground gas to be generated in addition to the
concentration of ground gases and the capacity
for organic material degradation.
All natural soils contain a proportion of organic
material and have a biome of micro organisms that
will degrade and cycle organic material as part of
the natural soil cycle, with CO2 and CH4 respired
as by-products depending on the prevailing
ground conditions.
However, based on the results received to date,
limited ground gas has been encountered and the
site is considered to be low risk (CS1).
Figure 8. Example Borehole log
Figure 9.Exploratory plan with area of loose ground highlighted
in a pink hatch
3.6 Engineering Review
Page 106

Page 107

31  •  February 2024  •  Forres Academy
SUDS Strategy
Surface Water Discharge
The existing surface water run-off is 17l/s, this was
concluded using a 4.9ha area of greenfield.
The main impact of a development is to increase
the proportion of impermeable surfaces (e.g.,
roofs and paved areas) within the site and without
careful planning this can increase peak rate runoff.
Sustainable Drainage Systems (SUDS) aim to
mitigate this effect by emulating natural drainage
systems and the provision of storage.
Treatment must be provided in accordance
with the recommendations of The SUDS Manual
(CIRIA Document C753), SEPA and other
relevant guidance. To determine surface water
treatment requirements, The SUDS Manual (CIRIA
Document C753) initially requires identification
of the various land use classifications involved in
the development. Using Table 4.3 (Page63), the
following classifications are considered relevant:
• Non-residential parking with infrequent change
(e.g. schools, offices, < 300 traffic movements
a day)
• Commercial/Industrial roofing: Inert materials
The guidance confirms that the various land use
classifications identified require use of the Simple
Index Approach. This involves a comparison
between indices of likely pollution levels against
SUDS performance capacities. To deliver adequate
treatment, the selected SUDS components should
have a total pollution mitigation that equals or
exceeds the pollution hazard index. There are
several options for treatment, however, the best
choice will need to consider the site constraints
and space available.
For this reason, it is anticipated that options such
as SUDS basins and ponds will not be viable for
this site due to their large land take.
As such, options such as porous paving, filter strips
and linear swales which can be accommodated
within the landscaping will be preferred. It is also
assumed that to attenuate the additional storm
water runoff from the development, a below ground
storage tank will also be required.
The connection for the surface water is yet to
be approved by Scottish Water. However, the
preferred option is to connect to the combined
sewer to the north of the site, although, combined
sewer connections are not favoured by Scottish
Water. In the instance that a combined connection
is rejected, a surface water sewer will have to be
installed along Orchard Road with an outfall into
the Burn of Mosset, this option would involve
installing an offsite sewer approximately 350m
long in adopted land. See Figure 11.
Based on a 5l/s run off rate for the site, which
is yet to be approved by Scottish Water, it is
estimated approximately 1600m3 of storage will
be required to store the 1:200 year storm with
37% climate change. This may vary depending on
area of proposed hard standing and potentials for
capturing the 1:200 year storm on site.
The primary method of attenuation will be provided
by below ground attenuation tanks as it is
anticipated that options such as SUDS basins and
ponds will not be viable for this site due to their
large land take. Depending on the final location
and depth of the tanks, due to the high ground
water further measures to reduce the buoyancy
of these tanks may need to be considered in the
detailed design.
Figure 10.Existing surface water and foul water (combined) system as
displayed on Scottish Water maps.
Figure 11.Potential surface water sewer along Orchard Road
3.6 Engineering Review
Page 107

Page 108

32  •  February 2024  •  Forres Academy
3.6 Engineering Review
Foul Water
A Pre-Development Enquiry has been submitted
to Scottish Water to determine the effect of the
proposed development on the local sewer network.
Flooding
Existing flooding occurs within the site boundary
with both the 1 in 200 and 1 in 1000 year storm. A
flood risk assessment completed by Moray Council
in 2021 depicts the flood extents of both the Burn
of Mosset and River Findhorn considering their
flood prevention schemes. The flood extent from
the 2021 flood risk assessment is corroborated by
the SEPA flood maps. See Figures 12&13.
The 1 in 200 year storm flood risk assessment
carried out during the works for the Findhorn flood
prevention scheme display no flooding within the
site. Therefore, the 1 in 200 year fluvial flooding
occurs on the site due to flooding of the Burn of
Mosset. See figure 14.
Further Flood risk assessments required in order to
understand the flood risk within the site, however as
noted in the previous sections, it is proposed that
any flood water displaced by the development will
be offset through an on site flood compensation
scheme, subject to detailed design and approval
by Moray Council Flood Team and SEPA.
Full reports can be found in Appendix D. 
Figure 12. Flood risk Assessment showing both a 1 in 200+CC year flood
and 1 in 1000 year flood map undertaken by Moray Council in 2021
Figure 13. SEPA flood map Figure 14. Flood risk Assessment 1 in 200 year flood map undertaken in
2008
Page 108

Page 109

33  •  February 2024  •  Forres Academy
3.7 Existing Land Use
Existing Site and Land Use
The site is currently formal parkland. To the
northern boundary is the existing Applegrove
Primary School. The playing fields associated with
the school form part of the site and are currently
unfenced and accessible by the public. Orchard
Road runs east west to the north of the site and
is currently used to access the existing Primary
School and several public car parks. There is
an area to the north of the primary school which
currently public open space.
To the western boundary of the site there is an
avenue of mature trees which run along Roysvale
Place and in front of the Forres Tennis Club. There
are a number of residential properties which
overlook the site and screening is provided by the
mature avenue of trees.
The southern part of the site which is existing park
land know as Roysvale Park is bounded to the
east by residential properties and Sanquhar Road.
The existing Forres Academy lies to the south of
Roysvale Park. The site consist of single storey
buildings and parking areas as well as mature
trees and vegetation.
View looking at the Roysvale Park site
Page 109

Page 110

34  •  February 2024  •  Forres Academy
Community Facility
The building shall be a facility for the whole
community. Located to be as accessible and
welcoming as possible. It shall also look to create
links with existing community facilities within the
area. As well as creating new links, there is also
a potential to utilise and retain facilities from the
existing school such as the swimming pool, parking
areas and playing fields. 
Intergeneration Learning
Opportunity for the building to link with the
existing primary school (Applegrove Primary) and
develop intergenerational learning opportunities.
Furthermore, there is an additional opportunity
create and develop and educational programme
linked to the construction process.
Access
The approach and routes which pupils and other
pedestrians shall take will be considered. There is
an opportunity to give the approach and access
at various positions, either on Orchard Road,
Sanquhar Road or Roysvale Place.
Environment / Biodiversity
Opportunities to position the new building within a 
central position on the site to maximise the amount
of sun it will get throughout the year. The existing
mature trees provide a mature landscape setting
and there is an opportunity to further enhance the
biodiversity by introducing new native planting.
Public Transport Links
The new building should link with existing public
transport and road infrastructure and minimise
pedestrian travel distance, and time, from the
existing town. This will promote active and
sustainable travel as well as developing ‘safer
routes’ to school initiative.
3.8 Opportunities
Playing Field
2
Plasmon Mill Court
48
BURDSYARD ROAD
5
1
Hazel
Craiglen
Donville
Roysvale Park
14
Pool
21
Manderlea
12
59
Strathcona
ESS
3
40
7
12
Sandhurst
10
2
Castle
20
CICELY PLACE
8
9
26
Weir
28
St Austins
Robinhill
Taigh Farrais
Glendoran
68
174
Venmhor
16
47 30
10
1
1
ROYSVALE PLACE
ESS
19
Suil na Mara
8
Brierly
32
10
Maranatha
34
Inverugie
13
24
4
Tennis
Cameron Court
8
LB
Canmore
Torvean
Fern Grove
Glenmore
111
1
SANQUHAR
TERRACE
20
47
2
Lindean
Applegrove Primary School
1
ALBERT STREET
103
21
7
6
EdelweissBURDSHAUGH
25
5
Cartref
St Leonards
27
1
Bank
56
Gardyne
Carrick
6
Roysvale Terrace
33
Grangehill
29
St Oswald
27a
Coille
STREET
Sports Pavilion
Rockhampton
5
1
44
Path (um)
57
4
17
16
Lodge
6
Longhill
PLASMON LANE
8
ORCHARD ROAD
View
113
War Veterans
27
20
Sports Pavilion
Cottages
4
Sunnyknowe
Hill
Killearnan
Streaval
The Hythe
Eradour
Brentwood
ALEXANDRA
2
Lynmore
Kirriehill
34
Rosehall
13
62
9
Plasmon Houses
10
16
13
Achnagairn
8
14
SANQUHAR DRIVE
17
172
Suilven
View
6
35
Dumyat
22
28
35
15
27
11 The Hirsel
Briarlea
Romach
4
3
Bank
5
Eskerfell
39
Redhythe
SANQUHAR
ROAD
Inveravon
1
ESS
5
164
CASTLE
Sports Court
Academy
15
Manse
23
Swimming
Tank
LB
1 to 24
16
10
Rosyln
8
18
ALBERT STREET
Muirfield
1
Uralla
12
32
13
Rannoch
1
14
13
FB
TERRACE
Vaila
20
4
2
Courts
152
Delamere
Tigh Na
10
Towerville
7
MACDONALD DRIVE
2
Monymusk
Sanquhar Loch
7
FB
32
Tomloan
Rosewood
16
9
30
Forres
40
2
Tennis Courts
31
Vegetation
Greenspaces
Woodland areas
Trees
TPO areas
Burn
Building Heights
1 storey
2 storey
3 storey
5 storey
Conservation
Conservation areas
Listed landscaped areas
A listed buildings
B listed buildings
C listed buildings
Routes
Bus routes
Dava Way route
Right of way
25m junction buffer
Services
Watermain
Water supply facilities
Surface water drainage
Foul drainage
Sewerage systems
Playing Field
2
Struan
Plasmon Mill Court
48
BURDSYARD ROAD
5
1
Hazel
Craiglen
Donville
Roysvale Park
14
Pool
21
Manderlea
12
59
Strathcona
ESS
3
40
7
12
Sandhurst
10
2
Castle
20
CICELY PLACE
8
9
26
Weir
28
St Austins
Robinhill
Taigh Farrais
Glendoran
68
174
Venmhor
16
47 30
10
1
1
ROYSVALE PLACE
ESS
19
Suil na Mara
8
Brierly
32
10
Maranatha
34
Inverugie
13
24
4
Tennis
Cameron Court
8
LB
Canmore
Torvean
Fern Grove
Glenmore
111
25
1
SANQUHAR
TERRACE
20
47
2
Lindean
Applegrove Primary School
1
ALBERT STREET
103
21
7
6
EdelweissBURDSHAUGH
25
5
Cartref
St Leonards
27
1
Bank
56
Gardyne
Carrick
6
Roysvale Terrace
33
Grangehill
29
St Oswald
27a
Coille
STREET
Sports Pavilion
Rockhampton
5
1
44
Path (um)
57
KING'S
W
AY
4
17
16
Lodge
6
Longhill
PLASMON LANE
8
ORCHARD ROAD
View
113
War Veterans
27
20
Sports Pavilion
Cottages
4
Sunnyknowe
Hill
Killearnan
Streaval
The Hythe
Eradour
2
Brentwood
ALEXANDRA
2
Lynmore
Kirriehill
34
Rosehall
13
62
9
Plasmon Houses
10
16
13
Achnagairn
8
14
SANQUHAR DRIVE
17
172
Suilven
View
6
35
Dumyat
22
28
35
15
27
11 The Hirsel
Briarlea
Romach
4
3
Bank
5
Eskerfell
39
Redhythe
SANQUHAR
ROAD
BRAID CRESCENT
Inveravon
1
ESS
5
164
CASTLE
Sports Court
Academy
15
Manse
23
Swimming
Tank
LB
1 to 24
16
10
Rosyln
8
18
ALBERT STREET
Muirfield
1
Uralla
12
32
13
Rannoch
1
14
13
FB
TERRACE
Vaila
20
4
2
Courts
152
Delamere
Tigh Na
10
Towerville
7
MACDONALD DRIVE
2
Monymusk
Sanquhar Loch
7
FB
32
Tomloan
Rosewood
16
9
30
Forres
40
2
Tennis Courts
31
Key
Site Boundary
Individual ' legal' boundaries
Vegetation
Greenspaces
Woodland areas
Trees
TPO areas
Burn
Building Heights
1 storey
2 storey
3 storey
5 storey
Conservation
Conservation areas
Listed landscaped areas
A listed buildings
B listed buildings
C listed buildings
Routes
Bus routes
Dava Way route
Right of way
25m junction buffer
Services
Watermain
Water supply facilities
Surface water drainage
Foul drainage
Sewerage systems
2
Struan
Plasmon Mill Court
11
1 to 11
48
BURDSYARD ROAD
House
148
5
ESS
11
1
7
Jade
Hazel
Orchard
1
Craiglen
Bank
Applegrove
B 9010
172
Donville
Roysvale Park
Hainings
The Dreish
151a & b
33
3
Pool
Seaforth
2
Manderlea
Strathcona
ESS
House
3
2
6
Fern Villa
40
12
9
Sandhurst
10
1
Car Park
Castle
1a
2
CICELY PLACE
Ivy Bank
GREEN ROAD
8
8
House
9
26
Dale
160
17
LB
4Tel Ex
St Austins
Robinhill
1
Glendoran
68
Glenernie
2
Shelter
160a
6
Venmhor
Villa
4
16
47
Garage
30
10
1
ROYSVALE PLACE
ESS
19
Suil na Mara
Brierly
Sandys Court
32
1
10
12
Club
9
Maranatha
4
34
Inverugie
Lane
13
24
4
168
8
LB
Canmore
7
CASTLEHILL ROAD
Duntulm
Fern Grove
Glenmore
Hall
Brisbane
13
25
1
CUMMING STREET
Corriden
Heathersett
20
47
2
Lindean
Applegrove Primary School
1
23
ALBERT STREET
Home
21
PO
7
156
6
EdelweissBURDSHAUGH
North
36
25
5
1 to 11
Cartref
St Leonards
27
1
1 to 10
Bank
56
Gardyne
1
Hainings
6
Roysvale Terrace
33
162
8
Grangehill
29
43
St Oswald
27a
Coille
STREET
Sports Pavilion
30
Rockhampton
Depot
5
1
15
44
HAININGS ROAD
57
KING'S WAY
b
4
ESS
17
4
16
Lodge
9
6
Longhill
Annexe
8
ORCHARD ROAD
View
War Veterans
27
20
Sports Pavilion
Cottages
4
Sunnyknowe
Hill
Killearnan
145
Manse
Streaval
174
Cottage
The Hythe
Path
Eradour
2
Orchard
Orchard
Brentwood
ALEXANDRA
153
Lynmore
Kirriehill
South
Funeral
Hainings
Sunningdale
21
34
Rosehall
1
62
LB
9
16
19
Bertann
13
Achnagairn
14
SANQUHAR DRIVE
Suilven
Fern
b
View
ROAD
6
35
Dumyat
28
c
35
15
27
11 The Hirsel
Briarlea
4
Cottage
Bank
5
Eskerfell
147
39
Redhythe
2
SANQUHAR
ROAD
BRAID CRESCENT
d
Manse
19
Inveravon
14
8
1
5
BANK LANE
Lilybank
5
GowanleaBahati
CHURCH
ROAD
Wynd
CASTLE
15
Manse
Swimming
Fraser
LB
West
21
16
10
3
Rosyln
8
18
Kirkholm
ALBERT STREET
Muirfield
24
1
Uralla
12
Car Park
1
25
13
Rannoch
38
14
7
41
17
TERRACE
a
3
Vaila
4
2
Willowbrae
20
Delamere
Club
152
Tigh Na
164
Towerville
7
2
166
Monymusk
Hall
160c
7
FB
34
32
Beverley
11
Rosella
8
Tomloan
Rosewood
16
9
The Mews
30
40
25
Dalmoulin
2
Tennis Courts
31
Site Opportunities
Page 110

Page 111

35  •  February 2024  •  Forres Academy
3.9 Constraints
Proposed Access
On the east edge of the site, there is an existing
junction along Sanquhar Road which serves the
houses behind. Any vehicular access/ egress
points for the proposed school are to be a minimum
of 25m from the existing junction opposite. 
Existing Services
There are several existing services within the site
boundary as well as existing attenuation tanks. The
proposed building needs to consider the location
of these services.
Privacy
The design and construction of the new school
building must prioritise privacy considerations for
neighbouring houses, especially given the dense
urban setting. Strategic placement of windows,
landscaping, and architectural features should be
implemented to minimize visual intrusion.
Trees
The site features multiple areas of mature trees,
necessitating careful consideration during the
design and construction of the new school
building. Ensuring the preservation of these trees
is crucial, with attention given to factors such as
visibility and proximity to existing junctions as well
as the potential for bat roosts and other protected
species.
Right of Way
There are two ‘rights of way’ within the site boundary,
one which bisects the site and one which sweeps
around the boundary, both of which must be taken
into account in the design of the new school.
Communication with the council is imperative to
ensure the proper integration of these easements
into the proposed school layout.
TREES
TREES
TREES
PRIMARY
SCHOOL
Site Constraints
Playing Field
Plasmon Mill Court
48
BURDSYARD ROAD
5
1
Roysvale Park
14
Pool
21
Manderlea
12
59
ESS
3
40
7
Sandhurst
10
2
Castle
20
CICELY PLACE
8
9
26
Weir
28
St Austins
Robinhill
Taigh Farrais
Glendoran
68
174
Venmhor
16
47 30
10
1
1
ROYSVALE PLACE
ESS
19
Suil na Mara
8
Brierly
32
10
Maranatha
34
Inverugie
13
24
4
Tennis
Cameron Court
8
LB
Canmore
Torvean
Fern Grove
Glenmore
111
1
SANQUHAR
TERRACE
47
2
Applegrove Primary School
1
103
21
6
EdelweissBURDSHAUGH
25
5
Cartref
27
56
Gardyne
Carrick
Roysvale Terrace
33
29
27a
Coille
STREET
Sports Pavilion
Rockhampton
5
1
44
Path (um)
57
4
17
16
Lodge
6
Longhill
PLASMON LANE
113
27
20
Sports Pavilion
4
Sunnyknowe
Streaval
The Hythe
Brentwood
ALEXANDRA
2
Lynmore
Kirriehill
34
13
62
9
Plasmon Houses
10
16
13
8
14
SANQUHAR DRIVE
17
172
Suilven
View
6
35
Dumyat
22
28
35
15
11 The Hirsel
Briarlea
Romach
4
3
5
Eskerfell
39
Redhythe
SANQUHAR
ROAD
Inveravon
1
ESS
5
164
CASTLE
Sports Court
Academy
15
23
Swimming
Tank
LB
1 to 24
10
8
ALBERT STREET
Uralla
12
32
13
Rannoch
1
13
FB
TERRACE
Vaila
20
4
2
Courts
152
Delamere
Tigh Na
10
7
MACDONALD DRIVE
2
Monymusk
Sanquhar Loch
7
FB
32
Rosewood
16
30
Forres
40
2
Tennis Courts
31
Services
Watermain
Water supply facilities
Surface water drainage
Foul drainage
Sewerage systems
Playing Field
2
Struan
Plasmon Mill Court
48
BURDSYARD ROAD
5
1
Hazel
Orchard
Craiglen
Donville
Roysvale Park
The Dreish
33
14
Pool
Seaforth
21
Manderlea
12
59
Strathcona
ESS
House
2
6
3
40
12
9
Sandhurst
10
2
Castle
20
CICELY PLACE
Ivy Bank
GREEN
ROAD
8
9
26
St Austins
Robinhill
Taigh Farrais
Glendoran
68
174
Venmhor
16
47 30
10
1
1
ROYSVALE PLACE
ESS
19
Suil na Mara
8
Brierly
32
1
10
Maranatha
34
Inverugie
13
24
4
Cameron Court
8
LB
Canmore
CASTLEHILL ROAD
Torvean
Fern Grove
Glenmore
Brisbane
13
25
1
Heathersett
SANQUHAR
TERRACE
20
47
2
Lindean
Applegrove Primary School
1
23
ALBERT STREET
Home
21
7
6
EdelweissBURDSHAUGH
25
Cartref
St Leonards
27
1
Bank
56
Gardyne
1
Carrick
6
Roysvale Terrace
33
Grangehill
29
43
St Oswald
27a
Coille
STREET
Sports Pavilion
Rockhampton
5
1
44
Path (um)
57
KING'S
W
AY
4
ESS
17
16
Lodge
9
6
Longhill
PLASMON LANE
8
ORCHARD ROAD
View
War Veterans
27
20
Sports Pavilion
Cottages
4
Sunnyknowe
Hill
Killearnan
Streaval
The Hythe
Eradour
2
Brentwood
ALEXANDRA
2
Lynmore
Kirriehill
Funeral
21
34
Rosehall
13
62
9
Plasmon Houses
10
16
16
Bertann
13
Achnagairn
8
14
SANQUHAR DRIVE
17
172
Suilven
View
6
35
Dumyat
22
28
35
15
27
11 The Hirsel
Briarlea
Romach
4
3
Bank
5
Eskerfell
39
Redhythe
SANQUHAR
ROAD
BRAID CRESCENT
19
Inveravon
14
1
ESS
5
GowanleaBahati
CHURCH
ROAD
CASTLE
Sports Court
Academy
15
Manse
23
Swimming
Tank
LB
1 to 24
16
10
Rosyln
8
18
ALBERT STREET
Muirfield
24
1
Uralla
12
Car Park
32
13
Rannoch
1
14
41
TERRACE
Vaila
20
4
2
W
illowbrae
Delamere
Club
Tigh Na
10
Towerville
7
MACDONALD DRIVE
2
Monymusk
Sanquhar Loch
7
FB
34
32
Beverley
11
Rosella
8
Tomloan
Rosewood
16
9
The Mews
30
Forres
40
25
2
Tennis Courts
31
Key
Site Boundary
Individual ' legal' boundaries
Vegetation
Greenspaces
Woodland areas
Trees
TPO areas
Burn
Building Heights
1 storey
2 storey
3 storey
5 storey
Conservation
Conservation areas
Listed landscaped areas
A listed buildings
B listed buildings
C listed buildings
Routes
Bus routes
Dava Way route
Playing Field
2
Struan
Plasmon Mill Court
48
BURDSYARD ROAD
5
1
Hazel
Craiglen
Donville
Roysvale Park
The Dreish
14
Pool
21
Manderlea
12
59
Strathcona
ESS
2
6
3
40
7
12
Sandhurst
10
2
Castle
20
CICELY PLACE
8
9
26
Weir
28
St Austins
Robinhill
Taigh Farrais
Glendoran
68
174
Venmhor
16
47 30
10
1
1
ROYSVALE PLACE
ESS
19
Suil na Mara
8
Brierly
32
10
Maranatha
34
Inverugie
13
24
4
Cameron Court
8
LB
Canmore
Torvean
Fern Grove
Glenmore
111
Brisbane
25
1
SANQUHAR
TERRACE
20
47
2
Lindean
Applegrove Primary School
1
ALBERT STREET
21
7
6
EdelweissBURDSHAUGH
25
5
Cartref
St Leonards
27
1
Bank
56
Gardyne
1
Carrick
6
Roysvale Terrace
33
Grangehill
29
43
St Oswald
27a
Coille
STREET
Sports Pavilion
Rockhampton
5
1
44
Path (um)
57
KING'S
W
AY
4
17
16
Lodge
6
Longhill
PLASMON LANE
8
ORCHARD ROAD
View
113
War Veterans
27
20
Sports Pavilion
Cottages
4
Sunnyknowe
Hill
Killearnan
Streaval
The Hythe
Eradour
2
Brentwood
ALEXANDRA
2
Lynmore
Kirriehill
21
34
Rosehall
13
62
9
Plasmon Houses
10
16
13
Achnagairn
8
14
SANQUHAR DRIVE
17
172
Suilven
View
6
35
Dumyat
22
28
35
15
27
11 The Hirsel
Briarlea
Romach
4
3
Bank
5
Eskerfell
39
Redhythe
SANQUHAR
ROAD
BRAID CRESCENT
19
Inveravon
1
ESS
5
164
CASTLE
Sports Court
Academy
15
Manse
23
Swimming
Tank
LB
1 to 24
16
10
Rosyln
8
18
ALBERT STREET
Muirfield
1
Uralla
12
Car Park
32
13
Rannoch
1
14
FB
TERRACE
Vaila
20
4
2
W
illowbrae
Delamere
Tigh Na
10
Towerville
7
MACDONALD DRIVE
2
Monymusk
Sanquhar Loch
7
FB
34
32
Rosella
8
Tomloan
Rosewood
16
9
30
Forres
40
2
Tennis Courts
31
Conservation
Conservation areas
Listed landscaped areas
A listed buildings
B listed buildings
C listed buildings
Page 111

Page 112

LOCHYHILL4.0
Page 112

Page 113

37  •  February 2024  •  Forres Academy
4.1 Location Overview
Lochyhill site within the context of Forres
Page 113

Page 114

38  •  February 2024  •  Forres Academy
The site at Lochyhill has been characterised by
a rural setting with an agricultural farm on the
adjacent land for the majority of its existence. The
land to the west of Lochyhill underwent a gradual
transformation into a residential community in the
late 20th and early 21st centuries.
Emerging in the late 20th century to the east of
the site, the Enterprise Park highlights Forres’
dedication for economic growth and innovation.
Crafted in response to the needs of contemporary
industry, the park has a strategy to draw in
businesses and develop employment opportunities
within the town. Its architectural layout integrates
contemporary industrial structures and facilities.
During this period, despite recent residential
and enterprise park developments around the
periphery of the site, the site itself has remained
mostly untouched.
4.2 Historical Analysis
c1870
c1950 c2023
c1910
Page 114

Page 115

39  •  February 2024  •  Forres Academy
4.3 Photographic Survey
View of the Lochyhill site looking south
Lochyhill
Site
Forres Enterprise
Park (behind trees)
Page 115

Page 116

40  •  February 2024  •  Forres Academy
4.3 Photographic Survey
Lochyhill
Site
A96
Road
Forres
Golf
Course
Clovenside
Cemetery
Forres
Enterprise
Park
Aerial view of the Lochyhill site
Page 116

Page 117

41  •  February 2024  •  Forres Academy
4.4 20 Minute Neighbourhood
9
10
6
2
The Lochyhill site is on the outskirts of the town and
is located east to the majority of Forres’ facilities.
The Forres Enterprise Park, which is located east
of the site, is a 15 minute walk and accommodates
several small and medium sized businesses.
Several community and amenity facilities are
located around the site, such as the Forres Golf
Club and the Forres Squash and Fitness Club.
There are also a couple of public green spaces
and woodlands which are in excess of a 20 minute
walk from the site.
The majority of the food retailers are located along
the town’s High Street and the closest supermarket,
which is the Co-op, is approximately a 20 minute
walk to the west of the site.
The main public transport network for the town, the
bus service, has a service which runs along the
A96, directly north of the site. The train station is to
the west of the site and is a 30 minute walk.
Community & Sports Facilities
Forres Golf Club9
Forres Squash & Fitness Club10
Healthcare & Emergency Services
Forres Police Station3
KEY
Parks & Green Spaces
Cluny Hill
Muir, Newforres & Council Woods
2
6
Map showing the public amenities in relation to Lochyhill.
Key
Site boundary
Proposed location
Buffer
0-5 minute
5-10 minute
10-15 minute
15-20 minute
Bus routes
© Crown copyright [and database rights] 2023 OS AC0000806936 Moray Council.
3
Page 117

Page 118

42  •  February 2024  •  Forres Academy
4.5 Existing Utilities
Record drawings indicate the existence of
Utility Infrastructure running across the wider
development site in which the proposed school
site sits. This comprises of Scottish Water Mains
Water and overhead BT Lines  that serve Lochyhill
Cottages to the south of the development site.
Initial proposals for siting the school site would
result in the existing BT Infrastructure having to be
diverted. The proposed school site is not affected
by the existing Scottish Water infrastructure.
The utilities for the proposed new development
would comprise of Electric, Mains Water and
Communications Infrastructure. Records show that
existing infrastructure for each of these services
are located in close proximity to the site.
Utility capacities and the ability for local
infrastructure to serve the site without significant
network reinforcement will be confirmed as the
design develops and applications are made. It
should noted that the wider development plans will
introduce further infrastructure capacity requirement
and may impact on the network capacity review
at the time of application for the school. Should
Lochyhill’s be identified as the preferred site we
would encourage early engagement and co-
ordination with the developer of the wider site and
its infrastructure. 
The record drawings received will be verified
through a Ground Penetrating Radar Survey
(GPRS) during the next stage of the project should
the site be selected as the preferred option.
With regard to drainage, a public 225mm diameter
vitrified clay foul water sewer runs through the site
parallel with the A96. This sewer will require a 3m
stand off to any proposed new buildings, unless
otherwise agreed with Scottish Water.  The closest
surface Water Sewers are located within Drumduan
Road to the west.
The capacity of the surrounding Scottish
Water network will be confirmed through a Pre
Development, however for surface water it is
assumed that a connection would be made to
the existing network at an Greenfield Equivalent
rate. This will require a new adopted sewer to be
constructed down Drumduan Road, approximately
200m long which would require a connection to an
existing 600mm diameter concrete pipe.
For foul water it is assumed that any new connection
will be formed to the existing sewer which passes
through the site.
For further details and Utility record drawings
please refer to Appendix C.
Page 118

Page 119

43  •  February 2024  •  Forres Academy
4.6 Engineering Review
Earthworks and Site Levels
Existing Site Topography
No topographical survey has been completed for
the site. 
The OS maps, seen in Figure 1, shows the south of
the site sits at approximately 40mAOD at Lochyhill
Farmhouse and falls north towards the A96 to
approximately 25mAOD. 
Proposed Levels and Cut / Fill Strategy
Earthworks will be required to form the new access
road, parking and rear play areas. 
At the appropriate time a high-level cut & fill exercise
would be carried out using 3D Civils to minimise
off-site disposal. However, as it is understood that
any development is to be located adjacent to the
A96, the overall level change in this area is unlikely
to result in a significant cut/fill exercise to provide a
development platform.
Ground Conditions - Previous Land Use
A review of the 1830-1880 historic map shows
that the site was previously used for agricultural
purposes. No major structures were recorded
within the site boundary prior to the construction of
the proposed school. See Figure 3.
From previous land use, the assumption is that
overall risk of contaminants is low, however, results
from the SI report will clarify the presence of
contaminants. 
Geology
An SI report was conducted for the site in 2008,
49no.trial pits and 4no.boreholes were carried out.
These confirmed the following general strata:
• Dark brown sandy TOPSOIL (0.25-0.8m thick,
average 0.4m)
• Loose to medium dense and dense fine to
medium SAND with varying proportions of sub
rounded to well-rounded gravel and cobbles,
occasionally described as SAND & GRAVEL
(proved to 7.0mbgl)
The distribution between loose and medium dense
sand is highlighted in Figure 4. The light blue
hatch displays trial holes with loose sand present
to approximately 1.2-2mbgl, the green hatch
highlights holes with loose sand present from
approximately 0-1.2mbgl.
Figure 1. OS - Map Extract
Figure 3. Aerial view 2022
Figure 2. Extract from 1830 - 1880s historical map
Figure 4. The distribution between loose and medium dense sand.
Blue hatch displays trial holes with loose sand present to approximately
1.2-2mbgl. Green hatch highlights holes with loose sand present from
approximately 0-1.2mbgl.
Page 119

Page 120

44  •  February 2024  •  Forres Academy
Earthworks and Site Levels
Nearby borehole information from the British
Geological Survey archives shows sand and gravel
layers above a sandstone bedrock throughout
ground strata. The lithological description from the
British Geological Survey details sand and gravel
as superficial deposits and sandstone as the
bedrock geology.
Further SI investigations will be required to
supplement this information based on the detailed
development proposals. Further testing will also
be required to confirm there has been no change
to any contamination levels on the site.
The Coal Authority GIS database identified that the
site is not within an area coal mining reporting or
where coal outcrops are present.
The site is within an area of 3-5% Radon potential.
Therefore, Radon Protection is required.
Groundwater
Groundwater was recorded during the ground
investigation in BH1 at 4.6mbgl and at 3.32mbgl
and 3.26mbgl during subsequent monitoring visits
on 08/04/2007 and 14/05/2007 respectively. Water
strikes were recorded during excavation of trial pits
1 to 6 at the lowest point (NW corner) of the site
at levels of 1.9 to 2.8mbgl.  Based on this ground
water may be encountered in deeper excavations.
Foundations
The interpretive report provided confirms that the
medium dense granular soils will provide a suitable
bearing stratum, with allowable bearing capacities
of 100kN/m2, for standard strip foundations.  In
areas of loose sand, highlighted in blue in Figure
Figure 5. Borehole data from 2008 SI
5, an allowance for additional trench fill should be
allowed for so that adequate bearing strata can be
reached. Further detailed SI investigations required
in order to confirm this assessment.
SUDS Strategy
Surface Water Discharge
The connection for the surface water is yet to be
approved by Scottish Water, and the area of hard
standing is yet to be set, therefore, the outfall
rate cannot determined. However, based on the
assumption the school will have a similar layout
to the proposals at Roysvale Park it is estimated
approximately 1400m3 of storage will be required
to store the 1:200 year storm with 37% climate
change.
The primary method of attenuation will be provided
by below ground attenuation tanks as it is
anticipated that options such as SUDS basins and
ponds will not be viable for this site due to their
large land take.
Treatment will be provided by options such as
porous paving, filter strips and linear swales which
can be accommodated within the landscaping.
Foul Water
The capacity of the Scottish Water Network and
treatment plant will need to be confirmed by Scottish
Water through a Pre-Development Enquiry.
Flooding
Pluvial flooding observed on SEPA flood maps,
however, this is not of concern as drainage design
will take this into consideration.
Figure 6. SEPA flood maps showing pluvial flooding
4.6 Engineering Review
No flood protection nearby, however, no risk of
fluvial flooding from either Burn of Mosset or river
Findhorn in accordance with the SEPA flood maps
and the river Findhorn.
Full reports can be found in Appendix D.
Page 120

Page 121

45  •  February 2024  •  Forres Academy
4.7 Existing Land Use
Existing Site and Land Use
The site is located to the north east of Forres on
the edge of the town It is best described as urban
fringe. To the north of the site the A96 runs east
to west. The site is currently a greenfield site -
farmland and has a number of small farm buildings
on the southern boundary.  It is also allocated as
R3 – Residential in the LDP.
To the east is the Forres Enterprise Park and a
number of detached residential properties. The site
boundary has a mature hedgerow and woodland
planting.
To the west of the site is residential estate and
Forres Golf Club. Drumduan Road could provide
the main vehicular route into the school as it runs
along the western boundary of the site.
The site rises up from the A96 and has a gently
sloping profile. There several areas of mature
planting within the site and views are dominated
by a tree lined ridge. Views looking from the ridge
to the north are of farmland and the A96 dominates
the view.
View looking at the Lochyhill site
Page 121

Page 122

46  •  February 2024  •  Forres Academy
Daylight / Environment
Opportunities to position new building on the site
to maximise the amount of sun it will get during the
year. Due to the site being clear of existing buildings
and trees, the new school can be orientated in
optimal position to deliver a sustainable building in
terms of energy consumption and environmental
conditions
Public Transport Links
The new building should link with existing public
transport infrastructure and minimise pedestrian
travel distance, and time, from the existing town to
promote active and sustainable travel. The location
of this site as well as the close proximity of public
transport links means there is opportunity for other
services to move there in the future, additionally
benefiting from the neighbouring Enterprise Park
Existing Buildings
As there is no existing school currently on this site,
there is no requirement to decant pupils to another
location whilst the construction work is ongoing
thus meaning their education is not disturbed.
Furthermore, as this site is clear and outside of a
conservation area, the construction process will be
relatively smooth and the contractors compound
can placed at the site boundary with minimal
impact on existing residential areas. 
Green Space
As there is no existing trees and minimal ecological
value, biodiversity enhancements will be easy to
achieve. Additionally, there is an opportunity to
develop a natural surface water management
system using SuDs.
4.8 Opportunities
Hotel
16
30
El
31
28
51a
59
DRUMDUAN PARK
43 to 45
31
Drumduan School
10
DRUMDUAN ROAD
2
46
1
40
Cemetery
33.7m
41
49
20.3m
Clovenside
Path
6
Sta
Sub
4
47
61
1
DRUMDUAN GARDENS
15
42
81
29.6m
13
2
24
30
22
68
56
1
38
14
Funeral Home
FORBESHILL
51
7
Clovenside
36
FORBESHILL
54
71
11
30
2
Reservoir
2
21
32
CARISBROOKE DRIVE
(covered)
MORAY GDNS
11
9
EDGEHILL ROAD
32
20
4
51
6
Carisbrooke
8
18
BS
2
3
Roseview
CassiefordCottages
1
60
Lochyhill Cottages
31
113
53
BARWELL ROAD
Drain
38.4m
39.5m
Spring
Sub Sta
El
Path (um)
El Sub Sta
El Sub Sta
85 1
27.2m
Drumduan
124
1
18
HIGHFIELD
125
44
2
WHITE ROAD
BIRKENHILLOCK ROAD
3
58
90
20
21
20
23
65
77
100
130
51
97
41
Play Area
21
24
138
2
12
56
3
12
46
EARLSLAND
53
1
17
2
14
Lay-by
46
15
81
19
FORBESHILL
10
ARGENTIER ROAD
17
7
16
13
104
HIGHFIELD
60
Cottage
37
74
2
26
117
1
7
1
48
2
38
23
37
114
CRESCENT
11
73
123
35
31
15
2
LB
2
Lochyhill
39
109
19
14
46
36
4
93
56
111
HIGHFIELD
79
115
23
11
1
1
4
13
12
80
134
3
73
95
7
22
14
1
39
65
12
5
60
75a
102
55
Gas Gov
Path (um)
75
4
HILLTOP ROAD
Cassieford
19
50
20.7m
55
Track
B 9011
11.1m
Key
Site Boundary
Vegetation
Greenspaces
Woodland areas
Trees
TPO areas
Water
Building Heights
1 storey
2 storey
3 storey
5 storey
Conservation
Conservation areas
Listed landscaped areas
A listed buildings
B listed buildings
C listed buildings
Routes
Bus routes
Right of way
Key
Site Opportunities
Page 122

Page 123

47  •  February 2024  •  Forres Academy
Services
The existing mains water and BT Infrastructure run
through the site. The existing water main cannot
provide the preferred 125mm connection for the fire
main. This means that a cost of provided upgraded
infrastructure could be expensive. Furthermore,
drainage runs east west through site easements
which could impact on building location. 
Location
As this location is on the edges of the town, a
proposed school with amenities located a significant
distance away poses challenges for accessibility
and convenience. This situation can lead to
increased transportation costs, longer commute
times, and hinder the establishment of a cohesive
school-community connection. Additionally, there
is no existing primary school which hinders the
possibility to develop 5-18 campus
Archaeological Interest
There is evidence of archaeological interest within
the site so further survey work will be required.
4.9 Constraints
Hotel
16
30
El
31
28
51a
59
DRUMDUAN PARK
43 to 45
31
Drumduan School
10
DRUMDUAN ROAD
2
46
1
40
Cemetery
33.7m
41
49
20.3m
Clovenside
Path
6
Sta
Sub
4
47
61
1
DRUMDUAN GARDENS
15
42
81
29.6m
13
2
24
30
22
68
56
1
38
14
Funeral Home
FORBESHILL
51
7
Clovenside
36
FORBESHILL
54
71
11
30
2
Reservoir
2
21
32
CARISBROOKE DRIVE
(covered)
MORAY GDNS
11
9
EDGEHILL ROAD
32
20
4
51
6
Carisbrooke
8
18
BS
2
3
Roseview
Cassieford
Wayside
Lonach
Cottages
1
60
Lochyhill Cottages
31
113
53
BARWELL ROAD
Drain
38.4m
39.5m
Spring
Sub Sta
El
Path (um)
El Sub Sta
El Sub Sta
85 1
27.2m
Drumduan
124
1
18
HIGHFIELD
125
44
2
WHITE ROAD
BIRKENHILLOCK ROAD
3
58
90
20
21
20
23
65
77
100
130
51
97
41
Play Area
21
24
138
2
12
56
3
12
46
EARLSLAND
53
1
17
2
14
Lay-by
46
15
81
19
FORBESHILL
10
ARGENTIER ROAD
17
7
16
13
104
HIGHFIELD
60
Cottage
37
74
2
26
117
1
7
1
48
2
38
23
37
114
CRESCENT
11
73
123
35
31
15
2
LB
2
Lochyhill
39
109
19
14
46
36
4
93
56
111
HIGHFIELD
79
115
23
11
1
1
4
13
12
80
134
3
73
95
7
22
14
1
39
65
12
5
60
75a
102
55
Gas Gov
Path (um)
75
4
HILLTOP ROAD
Cassieford
19
50
20.7m
55
TrackB 9011
11.1m
STEEP SLOPE
LOCATION
LOCATION
STEEP SLOPE
STEEP SLOPE
Site Constraints
TREES
TREES
Key
Site Boundary
Page 123

Page 124

GRANTOWN ROAD5.0
Page 124

Page 125

49  •  February 2024  •  Forres Academy
5.1 Location Overview
Grantown Road site within the context of Forres
Page 125

Page 126

50  •  February 2024  •  Forres Academy
Located on the western edge of Forres, the
Grantown Road site has long showcased a natural
landscape featuring expansive green areas,
farmlands with associated structures, and dense
woodlands.
While much of the woodlands and green spaces
endure, the area to the east of the Grantown Road
site has recently undergone substantial residential
development. This shift can be attributed, in part,
to Forres’ expansion and the heightened demand
for housing in the 20th and 21st centuries.
Located just northeast of the site boundary,
additional residential development is underway
within the new Woodroffe Grange development,
contributing to the town’s evolving urban landscape.
Similar to the Lochyhill site, despite ongoing
development surrounding its periphery, the
site itself has largely remained untouched for a
significant period.
5.2 Historical Analysis
c1870
c1970 c2023
c1900
Page 126

Page 127

51  •  February 2024  •  Forres Academy
5.3 Photographic Survey
View of the Grantown Road site looking north
Grantown
Road Site
Page 127

Page 128

52  •  February 2024  •  Forres Academy
5.3 Photographic Survey
Grantown
Road Site
Woodroffe
Grange residential
development
Aerial view of the Grantown Road site
Page 128

Page 129

53  •  February 2024  •  Forres Academy
5.4 20 Minute Neighbourhood
3
4 13
14
15
16
3
The Grantown Road site is on the outskirts of the
town and is located south-west to the majority of
Forres’ facilities.
A large number of the food retailers are located
along the town’s High Street and the closest
supermarket, which is the Co-op, is a 15 minute
walk, on Grantown Road, to the north east of the
site.
There are several public green spaces in the
southwest of Forres but these are all located
in excess of a 20 minute walk from the site. The
Dava Way (a 23 mile trail across the ancient Celtic
province of Morayshire) can be linked into via a 25
minute walk from the site.
There is a new residential development which is
currently under construction - Woodroffe Grange -
which is a 5 minute walk from the site.
The train station is to the north east of the site and
is approximately 40 minute walk.
Parks & Green Spaces
Sanquhar Loch & Woodlands3
4
13
14
15
16
Mannachie Park
Loch of Blairs & Woodland
Limekilns Wood
River Findhorn
Academy Playing Field
KEY
Travel Routes
The Dava Way3
Key
Site boundary
Proposed location
Buffer
0-5 minute
5-10 minute
10-15 minute
15-20 minute
Bus routes
© Crown copyright [and database rights] 2023 OS AC0000806936 Moray Council.Map showing the public amenities in relation to Grantown Road.
Page 129

Page 130

54  •  February 2024  •  Forres Academy
5.5 Existing Utilities
Record drawings indicate the existence of major
Utility Infrastructure in close proximity of the site.
There is a high-pressure gas main and overhead
11kV SSE Infrastructure near the eastern boundary.
The high-pressure gas main has been identified as
a critical part of the national infrastructure. Diversion
or alteration of this pipeline is not recommended
and should the site be identified as the preferred
option then working within the SGN constraints will
be necessary. For this pipeline the construction of
any buildings will not be permitted within 32 mtrs,
other groundwork’s could be undertaken up to
6mtrs either side of the pipeline. Initial indications
are that these constraints will not have a significant
effect on the proposed school development.
A risk assessment would be conducted against the
overhead HV lines that sit on the eastern boundary
and would be developed and assessed against
the proposed setting-out arrangement within the
site. Should an unacceptable risk be identified
then an application will be made to re-route the HV
Infrastructure underground.
The utilities for the proposed new development
would comprise of Electric, Mains Water and
Communications Infrastructure. Records show that
existing infrastructure for each of these services
are located in close proximity to the site.
Utility capacities and the ability for local
infrastructure to serve the site without significant
network reinforcement will be confirmed as the
design develops and applications are made. With
the site being located on the southern outskirts of
Forres and from information contained within the
record drawings there is a higher level of risk that
utilities capacities will be available without further
reinforcement.
The record drawings received will be verified
through a Ground Penetrating Radar Survey
(GPRS) during the next stage of the project should
the site be selected as the preferred option.
With regard to drainage, there are no existing
adopted sewers within the site boundary, and an
Pre Development Enquiry will be required to confirm
the location and capacity for any connection to
the wider Scottish Water network. The closest foul
sewer is located within the development north
of the site at Woodroffe Grange. To form a foul
connection to this network, a new adopted sewer
approximately 500m long would be required to be
constructed along Grantown Road.
No Surface water sewers are located in the vicinity,
therefore it is assumed that any surface water will
be discharged to the watercourse to the south of
the site at an equivalent greenfield rate and subject
to any required SEPA and 3rd party land consents.
For further details and Utility record drawings
please refer to Appendix C.
Page 130

Page 131

55  •  February 2024  •  Forres Academy
5.6 Engineering Review
Earthworks and Site Levels
Existing Site Topography
No topographical survey has been completed for
the site.
The OS maps, seen in Figure 1, shows the south
of the site sits at approximately 35mAOD and falls
north towards the river Findhorn to approximately
20mAOD. 
Proposed Levels and Cut / Fill Strategy
As the development area is relatively flat, limited
earthworks will be required to form the new access
road, parking and rear play areas.
At the appropriate time a high-level cut & fill
exercise would be carried out using 3D Civils to
minimise off-site disposal.
Ground Conditions - Previous Land Use
A review of the 1830-1880 historic map shows
that the site was previously used for agricultural
purposes. No major structures were recorded
within the site boundary prior to the construction of
the proposed school. See Figure 2.
The development to the south of the site started
construction in 2022, as can be seen in Figure 4.
From previous land use, the assumption is that
overall risk of contaminants is low, however, results
from the SI report will clarify the presence of
contaminants. 
Geology
There is no nearby borehole information from the
British Geological Survey archives, however, the
lithological description from the British Geological
Survey depicts sandstone bedrock with gravel and
sand superficial deposits. Finalised SI information
will be required to determine site specific ground
conditions.
The Coal Authority GIS database identified that the
site is not within an area coal mining reporting or
where coal outcrops are present.
The site is within an area of 1% Radon potential.
Therefore, the minimum level of Radon Protection
is required.
Figure 1. OS - Map Extract
Figure 3. Aerial view 2003 Figure 4. Aerial view 2022
Figure 2. Extract from 1830 - 1880s historical map
Page 131

Page 132

56  •  February 2024  •  Forres Academy
SUDS Strategy
Surface Water Discharge
The connection for the surface water is yet to be
approved by Scottish Water, it is assumed the
outfall will be to the watercourse south of the site
subjected to 3rd party land consent.
The area of hard standing is yet to be set, therefore,
the outfall rate cannot be determined. However,
based on the assumption the school will have a
similar layout to the proposals at Roysvale Park it
is estimated approximately 1400m3 of storage will
be required to store the 1:200 year storm with 37%
climate change, this is based on greenfield runoff
rate being approved by Scottish Water.
The primary method of attenuation will be provided
by below ground attenuation tanks as it is
anticipated that options such as SUDS basins and
ponds will not be viable for this site due to their
large land take.
Treatment will be provided by options such as
porous paving, filter strips and linear swales which
can be accommodated within the landscaping.
Foul Water
The capacity of the Scottish Water Network and
treatment plant will need to be confirmed by Scottish
Water through a Pre-Development Enquiry.
A new development south of the site has the
potential to provide a foul water connection, to be
approved by Scottish Water. This will require a new
adopted sewer to be constructed down Grantown
Road, approximately 500m long.
Figure 4. SEPA flood maps showing pluvial flooding
Flooding
Pluvial flooding observed on SEPA flood maps,
however, this is not of concern as drainage design
will take this into consideration.
No flood protection nearby, however, no risk of
fluvial flooding from either Burn of Mosset or river
Findhorn in accordance with the SEPA flood maps
and the Moray Council Flood Risk Assessment.
Full reports can be found in Appendix D.
5.6 Engineering Review
Page 132

Page 133

57  •  February 2024  •  Forres Academy
5.7 Existing Land Use
Existing Site and Land Use
Greenfield located to the south of Forres town
centre. The A940 runs along the south eastern
boundary of the site and the site can be accessed
from this road. To the east of the site there is a large
belt of mature woodland. Housing is located to the
north of the site and accessed from Ferry Road.
There is also a belt of woodland planting which will
provide screening to the properties locating along
this side of the site. The site is relatively flat and
feels open with long open views to the north west
and views of mature woodland to the south.
View looking at the Grantown Road site
Page 133

Page 134

58  •  February 2024  •  Forres Academy
5.8 Opportunities
27
12
8 11
Issues
22
LB
28.4m
North Lodge
FALCONER AVENUE
2
12
13
Caleta
10
WHITEROW DRIVE
Stone
Balnageith
10
25
Cottage
A 940
Knockomie
1
Plantation
32.4m
Fairyhills
Track
Stables
29
5
18.0m
WB
3
1WEBSTER DRIVE
Lodge
Knockomie
ESS
3
9
1
2
ESS
14
6
12
ASSAM ROAD
KENSAL GREEN
2
1
16
10
15
6
13
1
35
31
2
43
41
37
25
39
27
9
17
Balancing Pond
2
8
5
1
1
MACRAE COURT
5
1
BRANDER GARDENS
RIDDOCK GARDENS
17
19
33
19
3
45
4
18
20 16
22
9
10
26
35
49 to 55
41 to 47
Play Area
13
6
34
19.4m
19
1
CUMISKIE CRESCENT
Hotel
57
25
11
2
20
4
2
11
1
1
15
19
2
37
Knockomie
2
SCOTT STREET
Track
House
Cherrylea
18.0m
The Bothy
Caberfeidh
Cherrybank
Pond
Whiterow
Cottage
3
Fourwinds
16.2m
Whiterow
32.9m
Cherrybank
Sinks
Cottage
Cottage
34.9m
El Sub Sta
2
10
16
1
WILSON ROAD
WEBSTER DRIVE
2
18
W
HITLEY
CRESCENT
Sentosa
38
2
47
49
57
52
57
51
48
27
37
Thistle House
Path
An Sithean
18
16
Path (um)
1
CINCHONA ROAD
13
19
24
Wood
Cattle
Track
Track
32.3m
30.1m
Grid
Daylight / Environment
Opportunities to position new building on the site
to maximise the amount of sun it will get during the
year. Due to the site being clear of existing buildings
and trees, the new school can be orientated in
optimal position to deliver a sustainable building in
terms of energy consumption and environmental
conditions
New Neighbourhood
The new housing development in the vicinity is
advantageous for the location of a potential new
school, as it not only addresses the growing
residential needs but also creates a vibrant
community hub that promotes accessibility and
engagement with educational resources.
Existing Buildings
As there is no existing school currently on this site,
there is no requirement to decant pupils to another
location whilst the construction work is ongoing
thus meaning their education is not disturbed.
Furthermore, as this site is clear and outside of a
conservation area, the construction process will be
relatively smooth and the contractors compound
can placed at the site boundary with minimal
impact on existing residential areas. 
Green Space
As there are no existing trees and minimal
ecological value, biodiversity enhancements will
be easy to achieve - aiding in creating plenty of
outdoor spaces for education promoting a ‘nature
based campus’.
Site Opportunities
Key
Site Boundary
Vegetation
Greenspaces
Woodland areas
Trees
TPO areas
Water
Building Heights
1 storey
2 storey
3 storey
5 storey
Site Boundary
Vegetation
Greenspaces
Woodland areas
Trees
TPO areas
Water
Building Heights
1 storey
2 storey
3 storey
5 storey
Conservation
Conservation areas
Listed landscaped areas
A listed buildings
B listed buildings
C listed buildings
Future development area
Key
Page 134

Page 135

59  •  February 2024  •  Forres Academy
Public Transport
The absence of an existing public network route near
this site for a possible school is disadvantageous,
potentially hindering accessibility for students
and limiting community engagement with the
educational institution.
Unknown Services
There is no foul water connections on or within
site boundary. A new offsite connection would be
required along the A940 to the existing network on
Webster Drive. Additionally, as there is no surface
water sewers on site or in vicinity, surface water will
need to be taken to ground or to existing drainage
channels adjacent to Ferry Road.
Location
As this location is on the edges of the town, a
proposed school with amenities located a significant
distance away poses challenges for accessibility
and convenience. This situation can lead to
increased transportation costs, longer commute
times, and hinder the establishment of a cohesive
school-community connection. Additionally, there
is no existing primary school which hinders the
possibility to develop 5-18 campus.
5.9 Constraints
27
12
8 11
Issues
22
LB
28.4m
North Lodge
FALCONER AVENUE
2
12
13
Caleta
10
WHITEROW DRIVE
Stone
Balnageith
10
25
Cottage
A 940
Knockomie
1
Plantation
32.4m
Fairyhills
Track
Stables
29
5
18.0m
WB
3
1WEBSTER DRIVE
Lodge
Knockomie
ESS
3
9
1
2
ESS
14
6
12
ASSAM ROAD
KENSAL GREEN
2
1
16
10
15
6
13
1
35
31
2
43
41
37
25
39
27
9
17
Balancing Pond
2
8
5
1
1
MACRAE COURT
5
1
BRANDER GARDENS
RIDDOCK GARDENS
17
19
33
19
3
45
4
18
20 16
22
9
10
26
35
49 to 55
41 to 47
Play Area
13
6
34
19.4m
19
CUMISKIE CRESCENT
Hotel
25
11
2
20
4
2
11
1
1
15
19
2
37
Knockomie
2
SCOTT STREET
Track
House
Cherrylea
18.0m
The Bothy
Caberfeidh
Cherrybank
Pond
Whiterow
Cottage
3
Fourwinds
16.2m
Whiterow
32.9m
Cherrybank
Sinks
Cottage
Cottage
34.9m
El Sub Sta
2
10
16
1
WILSON ROAD
WEBSTER DRIVE
2
18
W
HITLEY
CRESCENT
Sentosa
38
2
47
49
57
52
57
51
48
27
37
Thistle House
Path
An Sithean
18
16
Path (um)
1
CINCHONA ROAD
13
19
24
Wood
Cattle
Track
Track
32.3m
30.1m
Grid
Site Constraints
LOCATION
LOCATION
NO PUBLIC
TRANSPORT
Key
Site Boundary
Page 135

Page 136

Site Location Appraisal6.0
Page 136

Page 137

61  •  February 2024  •  Forres Academy
6.1 Site Appraisal
At the end of October 2023, Moray Council
held an engagement session at Forres Library
to present and discuss site selection for a new
Forres Academy. The consultation boards were
also made available online and remained in the
library for public viewing until the end of November,
comments were welcomed from the community
in person and via email. These boards assessed
each site option against the project’s Strategic
and SMART objectives;  a series of issues, goals
and criteria that were developed by Moray Council
as part of their strategic planning around future
schools in Moray.
In December 2023, the Design Team and Moray
Council undertook a wider technical appraisal of
the three sites: scoring each of the sites against
criteria such as planning considerations, flood risk
and existing utilities as well as the previous ‘place’
based assessment.
The scoring matrix and outcomes can be found in
Appendix F.
Roysvale site
Lochyhill site
Grantown Road site
Page 137

Page 138

Forres Academy Current Site7.0
Page 138

Page 139

63  •  February 2024  •  Forres Academy
7.1 Location Overview
Existing school site within the context of Forres
Page 139

Page 140

64  •  February 2024  •  Forres Academy
7.2 Historical Analysis
Forres is one of the oldest of Scotland’s royal
burghs with the charter granted in 1153. In the 12th 
century, Forres, along with Inverness, Auldearn,
Nairn and Elgin formed part of a defensive chain
along the south coast of the Moray Firth.
Throughout the 15th and 16th centuries, Forres
thrived as a market town, capitalizing on its
strategic location and burgeoning trade networks.
By the 18th and 19th century, the site still remained
largely untouched. However the main town,
particularly along the High Street, began to rapidly
develop and became commercially and socially
significant for the area.
During the late 19th century and mid-20th century,
the towns growth continued, expanding away
from the High Street and particularly along Burn
of Mosset, with new roads and public footpaths
appearing, allowing new housing and amenities to 
emerge.
Forres Academy - Existing School
The existing school was built in 1969 and has
been expanded and updated several times to
accommodate the requirements of modern
education.
c1870 c1940 c2023
Page 140

Page 141

65  •  February 2024  •  Forres Academy
Existing Buildings
Within the site and adjoining the existing school
is a community swimming pool building. This will
stay open and functioning during the demolition
of the existing school. Any future development will
have to consider its relationship with the existing
swimming pool building. 
Multiple sites
The existing school is spread over 2 sites with
1 of the sites used as a playing field for sports
activities. Additionally, the main site, which inhabits
the school building, is split in half by the Burn of
Mosset. The new school, on any of the potential
sites, will be within a single boundary.
Restricted Development
There is an area within the eastern wing of the site
which is out of bounds for future development as
it has recently had an outdoor gym installed on it.
Any future development will have to consider its
relationship with the new gym. 
Flooding
As per SEPA flood information, there are a several
areas within the site and existing building which
have a flood risk due to the location of the school
in relation to the burn. See the Appendix for further
detailed information.
RAAC
There are several areas within the school which
have RAAC present and these areas are not
accessible or usable by the staff or pupils. This has
caused disruptive learning for the pupils and thus
a new school is urgently required.
7.3 Site Analysis
Astrian
Playing Field
Plasmon Mill Court
93
48
BURDSYARD ROAD
5
138a
Issues
63
60
14
Pool
15
21
Path (um)
12
BEECHW
AY
Playing Field
59
ESS
Sinks
3
83
40
7
Sandhurst
2
13644
ANDERSON CRESCENT
31
20
Track
8
26
Weir
Picnic Area
28
Robinhill
Taigh Farrais
27
27a
4
68
68
174
Path (um)
2
Path (um)
47 30
1
ROYSVALE
PLACE
ESS
1
Suil na Mara
8
32
4
Tennis
Cameron Court Torvean
111
23
SANQUHAR
TERRACE
47
2
1
103
114
21
EdelweissBURDSHAUGH
25
FB
5
Cartref
4
13
140
56
Carrick
Roysvale Terrace
33
29
38
STREET
Sports Pavilion
10
1
44
Path (um)
57
LOCH
VIEW
GROVE
6
17
6
102
PLASMON LANE
113
27
20
El Sub Sta
4
Streaval
61
2
3
Kirriehill
5
W
OODSIDE
DRIVE
53
34
13
9
62
9
Plasm
on
Houses
10
16
8
SANQUHAR DRIVE
17
172
Suilven
14
35
6
35
Dumyat
22
28
35
11
The Hirsel
Romach
75
3
39
Path (um)
1
ESS
12
164
Sports Court
Academy
23
Swimming
Tank
1 to 24
27
126
12
32
71
LOCH VIEW
1
14
55
13
FB
Vaila
20
4
5
Courts
152
Delamere
97
10
7
MACDONALD
DRIVE
M
onym
usk
Sanquhar Loch
40
90
FB
32
81
Pond
30
Forres
40
25
31
C
C
C
C
SW
SW
C
C
C
C
C
Building to be retained for the
swimming pool
Out of bounds for development
Playing Field
2
Plasmon Mill Court
48
BURDSYARD ROAD
5
1
Hazel
Craiglen
Donville
Roysvale Park
14
Pool
21
Manderlea
12
59
Strathcona
ESS
3
40
7
12
Sandhurst
10
2
Castle
20
CICELY PLACE
8
9
26
Weir
28
St Austins
Robinhill
Taigh Farrais
Glendoran
68
174
Venmhor
16
47 30
10
1
1
ROYSVALE PLACE
ESS
19
Suil na Mara
8
Brierly
32
10
Maranatha
34
Inverugie
13
24
4
Tennis
Cameron Court
8
LB
Canmore
Torvean
Fern Grove
Glenmore
111
1
SANQUHAR
TERRACE
20
47
2
Lindean
Applegrove Primary School
1
ALBERT STREET
103
21
7
6
EdelweissBURDSHAUGH
25
5
Cartref
St Leonards
27
1
Bank
56
Gardyne
Carrick
6
Roysvale Terrace
33
Grangehill
29
St Oswald
27a
Coille
STREET
Sports Pavilion
Rockhampton
5
1
44
Path (um)
57
4
17
16
Lodge
6
Longhill
PLASMON LANE
8
ORCHARD ROAD
View
113
War Veterans
27
20
Sports Pavilion
Cottages
4
Sunnyknowe
Hill
Killearnan
Streaval
The Hythe
Eradour
Brentwood
ALEXANDRA
2
Lynmore
Kirriehill
34
Rosehall
13
62
9
Plasmon Houses
10
16
13
Achnagairn
8
14
SANQUHAR DRIVE
17
172
Suilven
View
6
35
Dumyat
22
28
35
15
27
11 The Hirsel
Briarlea
Romach
4
3
Bank
5
Eskerfell
39
Redhythe
SANQUHAR
ROAD
Inveravon
1
ESS
5
164
CASTLE
Sports Court
Academy
15
Manse
23
Swimming
Tank
LB
1 to 24
16
10
Rosyln
8
18
ALBERT STREET
Muirfield
1
Uralla
12
32
13
Rannoch
1
14
13
FB
TERRACE
Vaila
20
4
2
Courts
152
Delamere
Tigh Na
10
Towerville
7
MACDONALD DRIVE
2
Monymusk
Sanquhar Loch
7
FB
32
Tomloan
Rosewood
16
9
30
Forres
40
2
Tennis Courts
31
Vegetation
Greenspaces
Woodland areas
Trees
TPO areas
Burn
Building Heights
1 storey
2 storey
3 storey
5 storey
Conservation
Conservation areas
Listed landscaped areas
A listed buildings
B listed buildings
C listed buildings
Routes
Bus routes
Dava Way route
Right of way
25m junction buffer
Services
Watermain
Water supply facilities
Surface water drainage
Foul drainage
Sewerage systems
Playing Field
2
Struan
Plasmon Mill Court
48
BURDSYARD ROAD
5
1
Hazel
Craiglen
Donville
Roysvale Park
14
Pool
21
Manderlea
12
59
Strathcona
ESS
3
40
7
12
Sandhurst
10
2
Castle
20
CICELY PLACE
8
9
26
Weir
28
St Austins
Robinhill
Taigh Farrais
Glendoran
68
174
Venmhor
16
47 30
10
1
1
ROYSVALE PLACE
ESS
19
Suil na Mara
8
Brierly
32
10
Maranatha
34
Inverugie
13
24
4
Tennis
Cameron Court
8
LB
Canmore
Torvean
Fern Grove
Glenmore
111
25
1
SANQUHAR
TERRACE
20
47
2
Lindean
Applegrove Primary School
1
ALBERT STREET
103
21
7
6
EdelweissBURDSHAUGH
25
5
Cartref
St Leonards
27
1
Bank
56
Gardyne
Carrick
6
Roysvale Terrace
33
Grangehill
29
St Oswald
27a
Coille
STREET
Sports Pavilion
Rockhampton
5
1
44
Path (um)
57
KING'S
W
AY
4
17
16
Lodge
6
Longhill
PLASMON LANE
8
ORCHARD ROAD
View
113
War Veterans
27
20
Sports Pavilion
Cottages
4
Sunnyknowe
Hill
Killearnan
Streaval
The Hythe
Eradour
2
Brentwood
ALEXANDRA
2
Lynmore
Kirriehill
34
Rosehall
13
62
9
Plasmon Houses
10
16
13
Achnagairn
8
14
SANQUHAR DRIVE
17
172
Suilven
View
6
35
Dumyat
22
28
35
15
27
11 The Hirsel
Briarlea
Romach
4
3
Bank
5
Eskerfell
39
Redhythe
SANQUHAR
ROAD
BRAID CRESCENT
Inveravon
1
ESS
5
164
CASTLE
Sports Court
Academy
15
Manse
23
Swimming
Tank
LB
1 to 24
16
10
Rosyln
8
18
ALBERT STREET
Muirfield
1
Uralla
12
32
13
Rannoch
1
14
13
FB
TERRACE
Vaila
20
4
2
Courts
152
Delamere
Tigh Na
10
Towerville
7
MACDONALD DRIVE
2
Monymusk
Sanquhar Loch
7
FB
32
Tomloan
Rosewood
16
9
30
Forres
40
2
Tennis Courts
31
Key
Site Boundary
Individual ' legal' boundaries
Vegetation
Greenspaces
Woodland areas
Trees
TPO areas
Burn
Building Heights
1 storey
2 storey
3 storey
5 storey
Conservation
Conservation areas
Listed landscaped areas
A listed buildings
B listed buildings
C listed buildings
Routes
Bus routes
Dava Way route
Right of way
25m junction buffer
Services
Watermain
Water supply facilities
Surface water drainage
Foul drainage
Sewerage systems
Pool
ESS
Sinks
40
Sandhurst
136
31
20
Track
8
26
Weir
64
Picnic Area
Robinhill
27a
4
68
68
14
Path (um)
2
16
Path (um)
30
6
ROYSVALE PLACE
1
Suil na Mara
8
10
Maranatha24
4
Tennis
Cameron Court Torvean
Fern Grove
SANQUHAR TERRACE
47
2
21
25
FB
Cartref
4
13
140
Carrick
33
29
Sports Pavilion
10
1
44
Path (um)
57
LOCH VIEW
GROVE
6
17
Lodge
6
27
20
El Sub Sta
Sunnyknowe
Streaval
3
Kirriehill
5
WOODSIDE DRIVE
34
13
60
9
10
16
SANQUHAR DRIVE
11
17
Suilven
14
6
Dumyat
22
28
8
35
The Hirsel
Romach
75
Eskerfell
39
Redhythe
Path (um)
12
Sports Court
Academy
23
Swimming
Tank
27
Uralla
LOCH VIEW
13
Rannoch
14
FB
Vaila
4
5
Courts
Delamere
7
Sanquhar Loch
32
Pond
Forres
25
31
Existing site analysis
Page 141

Page 142

66  •  February 2024  •  Forres Academy
7.4 Existing Building
Given the aforementioned challenges with
refurbishment and reuse referenced in Section 1.6,
the recommendation has been made by Moray
Council to demolish the majority of the existing
Forres Academy. Demolition will be undertaken
following the completion of the new school building
to ensure continuity of education for the young
learners.
The areas of the building which are an exception to
this are the swimming pool, hydrotherapy pool and
associated ancillary spaces. Following  significant
investment and refurbishment, completed in 2016,
it is proposed that these buildings are retained and
a new external wall constructed along the line of
demolition. The swimming pool is currently rated
as ‘B’ for Condition and therefore it is anticipated
that there will be minimal refurbishment works
required to these spaces.
Demolition plan of existing building
Page 142

Page 143

67  •  February 2024  •  Forres Academy
7.5 Existing Utilities
Utility Records received identify existing utilities
infrastructure serving the school. In general, this
information informs the ongoing development of
isolations and disconnections during the demolition
phase. In addition, it will aid the assessment of
the scope of works associated with the option of
retaining the swimming pool/ hydrotherapy pool.
SGN
Two incoming natural gas supplies have been
identified. One to the west of the school that
appears to be dedicated to equipment within the
teaching block (i.e. science/ home economics/
art). The other supply enters at the east elevation
and serves the schools main heating and hot
water plant. At the time of the construction of the
swimming pool it appears that a branch of this gas
supply has been extended to the swimming pool
to serve the heating and hot water plant (including
pool heating).
SSE
Record information show a high voltage ring
entering the site from Sanquhar Road to the east
and terminating in a SSE substation within the
school.  Although not identified on the record
drawings a further substation exists to the rear of
the swimming pool and assumed as installed at
the time the swimming pool was constructed.
BT
The BT service enters the site off Sanquhar Road to
the east. A separate branch connection has been
installed directly to the swimming pool building
from an external joint box.
Scottish Water-Mains Water
It is not entirely clear from record drawings
where the mains water supply enters the school.
Anticipated as being from the north side of the site
but will need tested through future surveys. The
mains water supply for the swimming pool extends
from the main school connection and appears
to be run through the existing school to the Pool
block.
Drainage
It is assumed that the existing foul and surface water
drains from the existing building are assumed to
connect directly to the combined sewers on w and
Sanquhar Roads, (subject to CCTV survey). It is
assumed that any connections for the existing pool
building will be retained as part of the development.
Page 143

Page 144

New Proposal Site Layout Options8.0
Page 144

Page 145

69  •  February 2024  •  Forres Academy
8.1 Roysvale Park - Long List Site Organisation Options
Option 1a
Pros:
New secondary school location offers opportunity
to develop 5-18 community campus.
New secondary school building located away from
Common Good Land.
Pedestrian priority campus created by minimising
vehicles in close proximity to school building
Dedicated bus/ coach drop off location, avoids
road congestion
Dual functioning car park - serves both staff at
school and swimming pool/ 3G pitch for community
events.
Car park utilises existing access route.
Sports pavilion and grass pitch on Roysvale Park
retained
Cons:
Car park and 3G pitch located on split site.
Option 1b
Pros:
New secondary school location offers opportunity
to develop 5-18 community campus.
New secondary school building located away from
Common Good Land.
Pedestrian priority campus created by minimising
vehicles in close proximity to school building
Dedicated bus/ coach drop off location, avoids
road congestion
Dual functioning car park - serves both staff at
school and swimming pool/ 3G pitch for community
events.
Car park utilises existing access route.
Sports pavilion and grass pitch on Roysvale Park
retained
Cons:
Car park and 3G pitch located on split site.
Option 1a Option 1b
Page 145

Page 146

70  •  February 2024  •  Forres Academy
8.1 Roysvale Park - Long List Site Organisation Options
Option 1c
Pros:
New secondary school location offers opportunity
to develop 5-18 community campus.
New secondary school building located away from
Common Good Land.
Pedestrian priority campus created by minimising
vehicles in close proximity to school building
Dedicated bus/ coach drop off location, avoids
road congestion
Dual functioning car park - serves both staff at
school and swimming pool/ 3G pitch for community
events.
Car park utilises existing access route.
Sports pavilion and grass pitch on Roysvale Park
retained
Cons:
Car park and 3G pitch located on split site.
3G pitch isolates car park from wider campus.
Option 2
Pros:
New secondary school location offers opportunity
to develop 5-18 community campus.
New secondary school building located away from
Common Good Land.
Dedicated bus/ coach drop off location, avoids
road congestion
Car park in close proximity to school building.
Cons:
Car park and 3G pitch located on Common Good
Land.
Loss of existing sports pavilion on Roysvale Park.
Option 1c Option 2
Page 146

Page 147

71  •  February 2024  •  Forres Academy
8.1 Roysvale Park - Long List Site Organisation Options
Option 3
Pros:
New secondary school location (core teaching) offers
opportunity to develop 5-18 community campus.
Co-location of sports facilities for education and
community use.
Removing ‘larger volume spaces’ from core teaching
allow the mass of the building to be reduced.
New secondary school building located away from
Common Good Land.
Dedicated bus/ coach drop off location, avoids road
congestion
Sports pavilion and grass pitch on Roysvale Park
retained
Pedestrian priority campus created by minimising
vehicles in close proximity to school building
Dual functioning car park - serves both staff at school
and swimming pool/ 3G pitch for community events.
Car park utilises existing access route.
Cons:
Car park, 3G pitch and school indoor sports located
on split site.
PE staff may feel isolated from wider school
community.
Pupils required to walk to access to sports facilities,
potentially impacting on amount of teaching time due
to distance from main school building.
3G pitch and building isolates car park from wider
campus.
Option 4
Pros:
Proposed building location delivers good
adjacencies to existing swimming pool and primary
school.
Minimal disruption to Applegrove Primary School.
Dedicated bus/ coach drop off location, avoids
road congestion
Car park in close proximity to school building.
Cons:
New secondary school located on Common Good
Land.
Proposed building will be located further within the
flood plain which may represent a challenge with
respect to obtaining planning approval.
Loss of existing sports pavilion and grass pitch on
Roysvale Park.
Option 3 Option 4
Page 147

Page 148

72  •  February 2024  •  Forres Academy
8.2 Roysvale Park - Developed Site Organisation Option 1a
Development location for new secondary building
(core teaching and sport facilities) with civic
frontage onto Orchard Road.
Opportunity for 5-18 community and education
campus to be developed with Applegrove Primary
School.
Existing swimming pool, hydrotherapy pool and
ancillary spaces (changing etc) retained.
Existing sports pavilion on Roysvale Park retained.
Proposed visitors and accessible car parking
accessed from Orchard Road.
Proposed linear bus/ coach drop off layby running
parallel to Sanquhar Road (access from Burdsyard
Road, egress onto Sanquhar Rad).
Proposed school car park access and egress from
existing opening on Sanquhar Road.
Existing grass football pitch and running track
retained on Roysvale Park.
Proposed 3G 106x66m pitch located with close
proximity to Forres Swimming Pool and proposed
school car park.
Secondary School
Building Location
Visitor and Accessible
Car Park
Grass Football Pitch &
Running Track
3G Sports Pitch
School Car Park
Applegrove
Primary School
Coach Drop Off
Swimming &
Hydrotherapy
Pools
Page 148

Page 149

73  •  February 2024  •  Forres Academy
8.3 Roysvale Park - Developed Site Organisation Option 1b
Development location for new secondary building
(core teaching and sport facilities) with civic
frontage onto Orchard Road.
Opportunity for 5-18 community and education
campus to be developed with Applegrove Primary
School.
Existing swimming pool, hydrotherapy pool and
ancillary spaces (changing etc) retained.
Existing sports pavilion on Roysvale Park retained.
Proposed visitors and accessible car parking
accessed from Orchard Road.
Proposed linear bus/ coach drop off layby running
parallel to Sanquhar Road (access from Burdsyard
Road, egress onto Sanquhar Rad).
Proposed school car park access and egress from
existing opening on Sanquhar Road.
Existing grass football pitch and running track
retained on Roysvale Park.
Proposed 3G 106x66m pitch located with close
proximity to Forres Swimming Pool and proposed
school car park.
Secondary School
Building Location
Visitor and Accessible
Car Park
Grass Football Pitch &
Running Track
3G Sports Pitch
Coach Drop Off
Swimming &
Hydrotherapy
Pools
School
Car Park
Applegrove
Primary School
Page 149

Page 150

74  •  February 2024  •  Forres Academy
8.4 Roysvale Park - Developed Site Organisation Option 3
Development location for new secondary building
(core teaching) with civic frontage onto Orchard
Road.
Opportunity for 5-18 community and education
campus to be developed with Applegrove Primary
School.
Existing swimming pool, hydrotherapy pool
and ancillary spaces (changing etc) retained
and enhanced with new indoor school sports
accommodation construction on the existing
school site, creating a education and community
sports hub.
Existing sports pavilion on Roysvale Park retained.
Proposed visitors and accessible car parking
accessed from Orchard Road.
Proposed linear bus/ coach drop off layby running
parallel to Sanquhar Road (access from Burdsyard
Road, egress onto Sanquhar Rad).
Proposed school car park access and egress from
existing opening on Sanquhar Road.
Existing grass football pitch and running track
retained on Roysvale Park.
Proposed 3G 106x66m pitch located with close
proximity to Forres Swimming Pool, indoor sports
facilities and proposed school car park.
Applegrove
Primary School
Secondary School
Building Location
(Core Teaching)
Visitor and Accessible
Car Park
Grass Football Pitch &
Running Track
Coach Drop Off
3G Sports Pitch
Swimming &
Hydrotherapy
Pools
School
Car Park
Secondary School
Building Location
(Sports)
Page 150

Page 151

75  •  February 2024  •  Forres Academy
8.5 Lochyhill / Enterprise Park - Developed Site Organisation Option
Development location for new secondary building
(core teaching and sports facilities) with civic
presence onto A96.
Existing swimming pool, hydrotherapy pool and
ancillary spaces (changing etc) retained on
Burdsyard Road.
Proposed vehicular access from Drumduan Road,
including staff, visitor and accessible parking, bus/
coach drop off and service access.
New grass football pitch and running track and 3G
pitch.
Secondary School
Building Location
Accessible
Car Park
Grass Football Pitch &
Running Track
Coach Drop Off
3G Sports Pitch
School
Car Park
Page 151

Page 152

76  •  February 2024  •  Forres Academy
8.6 Grantown Road - Developed Site Organisation Option
Development location for new secondary building
(core teaching and sports facilities) with civic
presence onto Grantown Road (A940).
Existing swimming pool, hydrotherapy pool and
ancillary spaces (changing etc) retained on
Burdsyard Road.
Proposed vehicular access from Grantown Road,
including staff, visitor and accessible parking, bus/
coach drop off and service access.
New grass football pitch and running track and 3G
pitch.
Secondary School
Building Location
Accessible
Car Park
Grass Football Pitch &
Running Track
Coach Drop Off
3G Sports Pitch School
Car Park
Page 152

Page 153

Mechanical and Electrical9.0
Page 153

Page 154

78  •  February 2024  •  Forres Academy
9.1 Energy and Carbon Strategy
The LEIP programme performance energy and
carbon criteria, we believe sets the benchmark for
all new schools irrespective of whether they are
funded through the LEIP programme or through
other funding routes.
The energy consumption target for Forres
Academy is recommended to meet the LEIP
Band A consumption target of 67 to 83 kWh/sqm/
p.a when assessed under the LEIP calculation
methodology. It should be noted that the LEIP
energy consumption targets will not correlate
directly with the total in-use energy consumption.
We would propose a supplementary target of no
more than 100 kWh /sqm/p.a “at the meter” making
a reasonable allowance for community use of the
facility.
Arguably the most significant energy consumption
reductions can be realised by reducing heating
demand. Passive design solutions that involve
careful consideration of orientation, massing,
thermal bridging, air infiltration rates and building
envelope thermal performance will play a major role
in the ability to meet energy performance targets
and will form the initial focus in developing design
proposals to deliver against the energy targets.
A recent addition in the LEIP Phase 3 metric is the
introduction of embodied carbon targets that did
not exist in the prior two phases.
The targets promote a collaborative approach by
Designers and Contractors to address key topics
such as:
• Local Sourcing
• Minimising Waste
• Efficient fabrication
• Use of Recycled material
• Material Selection
• Design and construction for future ease of
dismantling and disposal/ re-use.
For further details in the approach to energy and
carbon reduction please refer to Appendix G.
Page 154

Page 155

79  •  February 2024  •  Forres Academy
9.2 Mechanical and Electrical Design Strategy
The design of MEP systems will focus on efficiency,
maintainability and simplicity of user controls.
The MEP services design will, at every stage,
focus on minimising system losses through
efficient placement of plant and equipment and
understanding the opportunities to limit energy
consumption and carbon emissions for example,
minimising hot water storage and ductwork/
pipework/ cable lengths to minimise system energy
losses.
The strategic approach to the engineering services
for the new facility shall be founded on the following
principals:
• Carbon efficient primary energy sources and
desire to reduce/ remove reliance on fossil
fuels.
• Recognise potential users of the facility
(Education & Community Use) and the inter-
relationship, operability & systems efficiency
for varying operational and occupancy profiles.
• Provide an internal environment which is
comfortable, safe, healthy and compatible with
the operations associated with the facility.
• Develop solutions that are compatible with the
Clients Brief for the project, taking cognisance
of any budgetary constraints.
• Develop engineering services solutions that
are simple in concept and in-use, reliable and
robust in operation.
• Design engineering services plant, plant rooms
and distribution systems with a focus on system
efficiencies and minimising distribution losses.
• Develop environmental control strategy for
summer and winter with the aim of simplistic
implementation and low reliance on technology.
• Design engineering services plant, plant rooms
and distribution systems taking account of the
requirement to provide safe access/provision
for maintenance, repair and replacement.
• Develop energy consumption monitoring
strategy for each of the uses and major loads
associated with the facility.
Please refer to Appendix G for further detail and
initial outline elemental specification of MEP
Systems in response to the strategic approach
outlined above.
Page 155

Page 156

Structural And Civil10.0
Page 156

Page 157

81  •  February 2024  •  Forres Academy
Structural Loading
Vertical loads on structures are dictated by the
relevant design codes and standards in accordance
with building use and occupancy classes.
Environmental loads acting on the structures, both
vertically and laterally will be assessed using a site-
specific methodology. Typical imposed load values
are shown in Table 1.
Material selection
Due to the varying types and sizes of structures,
a suitability exercise should be carried out at an
appropriate time to determine the best option for
the development.
The below matrix gives a traffic light indication of
the benefits of the main forms of construction to a
project.
Of course, individual building layout plays a huge
factor in this exercise as certain typical structural
elements lend themselves well to specific
situations, e.g. steel is well suited for large span
openings typically found in education projects
such as games halls and central atrium’s.
Architectural features will also play a role in the
material selection so early engagement between
design team members is beneficial for agreeing
the aspirations for the project.
Foundation Design
Through Site Investigation works geotechnical
ground conditions will be established to allow
a suitable foundation type to be determined –
see the below matrix indicating the suitability
for foundations when proposed with respective
superstructure materials
Geo-environmental testing is carried out as part
of the on-site suite of ground investigations and
will inform the design relating to gas membranes,
water supply pipe specification and determination
of and contamination sources within the ground.
MMC (Modern methods of construction)
While off-site manufacturing (OSM) of structural
elements has been a part of modern construction
for a long time, there are now opportunities to
expand on these elements for the benefit of the
entirety of the project.
Typical OSM elements include pre-cast concrete
or roof trusses which historically provide a higher
quality product, constructed to tighter tolerances
than on-site manufacturing.
With appropriate lead-times accounted for in the
programme, delivery of fully or partially erected
structural elements can also present an on-site
time saving.
Sustainability
Modern construction methods must also consider
the environment, via both carbon offsetting and
carbon footprint reduction. Reductions in footprint
are the preferred method of minimising emissions
and are achieved through consideration in terms of
both embodied carbon as a result of manufacturing
and also as a result of transport to site. Carbon
offsetting is seen as the less preferred option
and only used once all other practical measures
are taken. The aspirational hierarchy for net zero
structural design is shown in Figure 1.
Stability
Whether utilising a framed or a shear wall structural
solution, a regular and vertically repetitive layout
with allows for an efficient design of stability
members.
Where stability members can positively transfer the
horizontal loads from the floor and roof diaphragms
into the foundations in a single vertical line, the
need for transfer members can be avoided.
Repetitive structure also encourages development
of details which can be specified across multiple
areas, simplifying manufacturing/ construction and
building confidence through usage.
Further site investigation information can be found
under Appendix E.
Table 1
Table 2
Table 3
Figure 1. Aspirational hierarchy for net zero structural design
Figure 2. Shear wall structural solution
Figure 3. Shear wall structural solution
10.1 Structural Strategy
Page 157

Page 158

82  •  February 2024  •  Forres Academy
SUDS
The main impact of a development is increasing
the proportion of impermeable surfaces (e.g.,
roofs and paved areas) within the site, without
careful planning this can increase peak rate runoff.
Sustainable Drainage Systems (SUDS) aim to
mitigate this effect by emulating natural drainage
systems and the provision of storage.
The greenfield runoff rate for Roysvale Park has
been used to estimate the attenuation volume
required for all three sites. Based on this greenfield
run off rate, it is estimated approximately 1250m3
of storage will be required to store the 1:200 year
storm with 37% climate change. However, this
volume is correlated to total area of proposed hard
standing, therefore, it is subject to change based
on the architects layout. Furthermore, depending
on the layout, there is a possibility of capturing the
1:200 year +37% C/C rainfall event on site which
would reduce the total attenuation volume.
The primary method of attenuation will be provided
by below ground attenuation tanks as it is
anticipated that options such as SUDS basins and
ponds will not be viable for this site due to their
large land take.
Treatment
Treatment must be provided in accordance with
the recommendations of The SUDS Manual
(CIRIA Document C753), SEPA and other
relevant guidance. To determine surface water
treatment requirements, The SUDS Manual (CIRIA
Document C753) initially requires identification
of the various land use classifications involved in
the development. Using Table 4.3 (Page 63), the
following classifications are considered relevant
for all three sites:
• Non-residential parking with infrequent change
(e.g. schools, offices, < 300 traffic movements
a day)
• Commercial/Industrial roofing: Inert materials
The guidance confirms that the various land use
classifications identified require use of the Simple
Index Approach. This involves a comparison
between indices of likely pollution levels against
SUDS performance capacities. To deliver adequate
treatment, the selected SUDS components should
have a total pollution mitigation that equals or
exceeds the pollution hazard index. There are
several options for treatment, however, the best
choice will need to consider the site constraints and
space available. For this reason, it is anticipated
that options such as SUDS basins and ponds will
not be viable for this site due to their large land
take.
As such, options such as porous paving, filter strips
and linear swales which can be accommodated
within the landscaping will be preferred.
Connections
All surface water and foul connections require
approval by Scottish water.
Scottish Water’s preference for surface Water are
as follows:
1. Re-use
2. Soak-away
3. Watercourse
4. Surface water sewer
5. Combined sewer
The sites in question for Forres use a variance
of these options; Roysvale – Combined sewer,
Lochyhill/ Enterprise – Surface water sewer and
Grantown – watercourse. These connection
methods may vary depending on Scottish Water
approval.
Foul connections for all sites will be to either nearby
combined sewers or foul water sewers. Scottish
Water approval required prior to connection.
Further site investigation information can be found
under Appendix E.
10.2 Civil Strategy
Page 158

Page 159

Programme11.0
Page 159

Page 160

84  •  February 2024  •  Forres Academy
11.1 Programme Commentary
The programmes contained within Appendix H
and the commentary below reflect the timescales
required based on the Hub procurement model.
Should an alternative procurement route to Hub be
adopted it should be noted that this will result in a
minimum 6 months extension required to procure
and engage a new Design Team as well as potential
financial impacts.
Should the decision be made to proceed with a
Hub procurement model the new school at Forres
is to be delivered as part of the LEIP 3 Northern
Schools Programme managed by hub North
Scotland Limited. This programme looks to provide
a collaborative and aligned approach delivering:
• shared knowledge and resources,
• establishing replicable designs with associated
cost savings,
• accelerating the understanding and application
of the funding conditions,
• maximising economic and social benefits,
• monitoring and implementing lessons learned,
• alignment with the10 guiding principles of the
National Learning Strategy, and
• supporting wider collaboration with other
services and public partners.
The programme aims to deliver:
• Capital cost benefits, by ensuring a steady
and predictable work-stream for the local
market, promoting supply chain development
and enhance buying gains, delivering projects
faster
• Operational cost benefits, by creating
opportunities for co-location of facilities,
reducing build and running costs leading to
lower carbon emissions providing better places
for businesses and communities to work and
meet.
• Socio-economic benefits, by evidencing a
steady pipeline of work in the region which
would allow new employment opportunities
to be created locally within the supply chain.
With more confidence in workload, the supply
chain could widen their apprenticeships to the
local communities. Sustained employment in
the region would result in growth to the local
economy. In addition, the sharing and pooling
of resources will also cause a ripple effect,
allowing different ways of collaborative working
to be embraced and benefits to be gained,
such as knowledge sharing and upskilling
• Non-financial benefits, by reducing
development time across projects with a
consistent approach.  Suites of standard firm of
building contracts, specifications and technical
documentation can be developed, reducing the
production time-scales for creating bespoke
information. The time savings will result in
projects being delivered earlier compared to
being developed in isolation. The time saving
is in addition to the cost saving that would also
be realised.
The LEIP 3 North Schools Programme Partners
include:
• Aberdeen City Council
• Argyll and Bute Council
• Moray Council
• Orkney Islands Council
• Shetland Islands Council, along with
• Northern Alliance
• Scottish Futures Trust and
• Hub North Scotland Limited 
Page 160

Page 161

Cost Appraisal12.0
Page 161

Page 162

86  •  February 2024  •  Forres Academy
12.1 Cost Commentary
Currie and Brown have prepared high level Cost
Models for the developed site options for Forres
Academy. The costs for these options are as per
Table 1.
The main differences between the various cost
options are as follows, utilising Roysvale Park
(Option 1a) as the base line for comparison
purposes only:
• Roysvale Park (Option 1b) – smaller
development site and reduced extent of access
roads
• Roysvale Park (Option 3) – separate sports
block from main school building constructed
on footprint of existing school and associated
extended programme.
• Lochyhill – roundabout on A96, increased
allowance for safer routes to schools and land
purchase
• Granton Road – trenchfill to foundations, off-
site junction works at new school entrance,
increased allowance for safer routes to schools
and land purchase.
We would also highlight the following which forms
the basis of the Cost Models:
• Building costs based on Currie & Brown
benchmarking.
• Allowances included for refurbishment works
at junction to retained swimming pool following
demolition of existing school.
• External works surfacing etc based on
approximate quantities based on Architects
Landscape Layouts
• Allowances included for ground works ie cut
and fill, trenchfill etc with requirement /extent
to be confirmed once further Site Investigation
undertaken.
• Allowance included for fencing, site furniture,
external service connections including electrical
sub-stations.
• Preliminaries based on amended hNSL
pro-forma percentages to reflect extended
programme and current market conditions.
• Contractor’s margin, Design Team fees based
on hNSL pro-forma percentages.
• Design development risk based on percentages
reflective of current Scottish market.
• LEIP 2 and LEIP 3 targets based on SFT
percentage uplifts.
• Inflation included to mid-construction based on
BCIS indices and Currie & Brown’s Construction
Activity & Market Outlook. Due to the BCIS’s
heavy reliance on cost data for the other
regions of the UK and also due to the delay /
lag in BCIS receiving cost information, in our
opinion Currie and Brown’s inflation outlook is
more reflective of the current Scottish Market.
• Construction duration / programme assumes
183 weeks (209 weeks for Roysvale – Option 3)
• Allowances included for Authority costs ie
internal costs, legal costs / fees, IT active
equipment, interactive boards / screens etc.
• Authority cost for optimism bias / Client
contingency based on percentage.
• Authority costs include high level cost
allowances for off-site works ie safer routes
to schools, roundabouts, land purchase etc
where applicable to each option.
Table 1 - Cost Models
Page 162

Page 163

Recommendations and Next Steps13.0
Page 163

Page 164

88  •  February 2024  •  Forres Academy
13.1 Recommendations
To assist Moray Council in determining the most
appropriate site for building the new school, the
Design Team members including hub North
Scotland Ltd, and a representative from Moray
Council all participated in an “options appraisal”
exercise looking at varied criteria pertaining to
the three sites (Roysvale Park, Lochyhill and
Grantown Road), all of which were scored jointly
and collectively by the Design Team members;
the outcome of the options appraisal was that
Roysvale Park received the highest score.
Whilst there are risks associated with developing
any of the three sites, it was noted however that only
one of the sites (Roysvale Park) is under ownership
of Moray Council, whereas both Lochyhill and
Grantown Road would require the Council to
formally acquire the land in question. The major
risk with developing the Roysvale site, however, lies
with the fact that a major part of the developable
site is classed as “Common Good” and hence
Moray Council would need to be confident that
they, and their legal advisers, are able to remove
said restrictions in a timeous manner during the
design development phase of the project in time
to allow the main Contractor to commence works
on site in accordance with the project programme.
If Moray Council is confident that the Common
Good constraint can be removed prior to
commencement of construction on site (July 2025),
then the recommendation would be that Roysvale
Park would offer the best site solution for Moray
Council to deliver the new school.
Aerial view of Roysvale Park
Page 164

Page 165

89  •  February 2024  •  Forres Academy
13.2 Next Steps
The following ‘Next Steps’ are based on the
assumption that approval to proceed with
Roysvale Park as the preferred site, under a
Hub procurement route, is received.
Following the submission of this SSPS Report and
approval to proceed, the development programme
included in Appendix H proposes commencement
of Hub Stage 1 (RIBA Stage 2) at the end of March
2024. This stage runs for a seven month period,
concluding at the end of October. Hub Stage 2 will
follow on sequentially, concluding at the end of
July 2025.
Northern Schools Programme Approach
Forres Academy is to be delivered as part of the
LEIP 3 Northern Schools Programme managed by
hub North Scotland Limited. This programme looks
to provide a collaborative and aligned approach
and will follow the steps below:
1. Initial Goal Teams to be established with initial
workshops to be set up w/c 8th Jan 2024
1. Place
2. Net Zero
3. Inclusive Social Outcomes
4. Technical Collaboration
5. Procurement
2. Programme Wide Strategies. Supply Chain
Members to confirm contributors
3. Phase 1 strategies and mini-programmes to be
established
Common Good Land Review
It has been identified that part of the overall
site at Roysvale Park has been designated as
Common Good and as such presents additional
risk to the project. The proposed location for the
new secondary school building is on land to the
north of the footpath that dissects the site, and
is therefore not directly located on Common
Good Land. However it is currently proposed to
use the Common Good Land temporarily during
construction as site setup and the contractor’s
compound and permanently as a drop off layby
for buses and a grass sports pitch. The land
designation may need to be reviewed as part of
the project development.
Additional Surveys Required
To help support the Design Team’s work and
statutory approvals during Hub Stages 1 and 2, the
following surveys may be required:
• Ground Penetrating Radar Survey
• CCTV Drainage Survey
• Parking Survey
• Transport Statement
• Tree Survey and Reports
• Ecology and Habitat
• Archaeological Desk Based Assessment
• Flood Risk Assessment
• Asbestos Survey (if not available, for current
building)
• Intrusive Testing Tracing Surveys (existing
building, by MEP subcontractor)
Stakeholder Engagement
The initial stakeholder engagement which has
been undertaken during SSPS Phases A and B
will be built upon and developed throughout Hub
Stages 1 and 2.
Statutory (and other) Consultations
The Design Team have already engaged in some
light touch discussions with the Planning and
Roads and Transport departments and would look
to further these discussions during Hub Stage 1.
As the Forres Academy project will be classed as
a Major Development under The Town and Country
Planning (Hierarchy of Developments) (Scotland)
Regulations 2009, the formal Planning Application
will be subject to a 12 week pre-application
process.
Following the submission of the Planning
Application information will be prepared to enable
an application for Building Warrant however,
engagement with the Building Control Team will
occur prior to this to introduce the project, team
and agree the proposed Building Warrant stages.
The Design Team will also make contact with the
Scottish Fire and Rescue Service to discuss the
project with their Fire Safety Enforcement Officer
and engage in details discussions which will assist
with the Building Warrant process.
Should it be deemed a requirement by Moray
Council, the Design Team can also meet with the
Architectural Liaison Officer from Police Scotland
to discuss Secured by Design.
As all of the proposed options for Roysvale
Park in this report would be deemed a  ‘relevant
proposal’ (a proposal to relocate a school or
part of a school) under the terms of the Schools
(Consultation) (Scotland) Act 2010, Moray Council
will commence engagement, during the next stage,
with His Majesty’s Inspectors of Education (HMIE)
and prepare an Educational Benefits Statement
to support the chosen proposal in line with the
requirements set out in the Act.
Page 165

Page 166

Appendices14.0
Page 166

Page 167

91  •  February 2024  •  Forres Academy
Appendix A - Consultation Summary
Page 167

Page 168

92  •  February 2024  •  Forres Academy
Appendix B - The Education Brief, Adjacencies & Schedule of Accommodation
Page 168

Page 169

93  •  February 2024  •  Forres Academy
Appendix C - Existing Utilities Report
Page 169

Page 170

94  •  February 2024  •  Forres Academy
Appendix D - High Level Site Constraints Report
Page 170

Page 171

95  •  February 2024  •  Forres Academy
Appendix E - Site Investigations Report
Page 171

Page 172

96  •  February 2024  •  Forres Academy
Appendix F - Site Appraisals Assessment
Page 172

Page 173

97  •  February 2024  •  Forres Academy
Appendix G - Energy and Carbon Strategy
Page 173

Page 174

98  •  February 2024  •  Forres Academy
Appendix H - Programme
Page 174

Page 175

99  •  February 2024  •  Forres Academy
Appendix J - Cost Appraisal
Page 175

Page 176

jmarchitects
www.jmarchitects.net
info@jmarchitects.net
jmarchitects
12 Great Portland Street
London, W1W 8QN
london@jmarchitects.net
t 0207 580 5330
54 Princess Street
Manchester, M1 6HS
manchester@jmarchitects.net
t 0161 200 6300
50 Bell Street
Glasgow, G1 1LQ
glasgow@jmarchitects.net
t 0141 333 3920
64 Queen Street
Edinburgh, EH2 4NA
edinburgh@jmarchitects.net
t 0131 464 6100
Page 176

Page 177

Item 8.
Page 177

Page 178

Page 178

Page 179

Page 179

Page 180

Page 180

Page 181

Appendix 3 – Forres Academy Site Selection
Public Engagement - Online Survey Analysis 
Applegrove
/ Roysvale Lochyhills
Applegrove
/ Roysvale Lochyhills
Parent/Carer of a child attending school 172 158 52.1% 47.9%
Local resident living within Associated School Group (ASG) area. 140 227 38.1% 61.9%
Primary school pupil 23 16 59.0% 41.0%
Secondary school pupil 22 29 43.1% 56.9%
Primary school staff member 4 8 33.3% 66.7%
Secondary school staff member 11 18 37.9% 62.1%
Other 67 58 53.6% 46.4%
TOTAL 439 514 46.1% 53.9%
Alves Primary School 7 17 29.2% 70.8%
Anderson's Primary School 119 94 55.9% 44.1%
Applegrove Primary School 197 321 38.0% 62.0%
Dallas Primary School 9 4 69.2% 30.8%
Dyke Primary School 18 21 46.2% 53.8%
Kinloss Primary School 26 53 32.9% 67.1%
Logie Primary School 11 12 47.8% 52.2%
Pilmuir Primary School 122 98 55.5% 44.5%
I live out with ASG area 31 31 50.0% 50.0%
TOTAL 540 651 45.3% 54.7%
Living in Applegrove Catchment + Resident 76 195 28.0% 72.0%
Living in Applegrove Catchment + Parent 107 133 44.6% 55.4%
Single Category e.g.
Only Parent
Numbers %
439, 46%
514, 54%
Single Category e.g. Only Parent
Applegrove / Roysvale Lochyhills
540, 45%
651, 55%
Catchment Areas
Applegrove / Roysvale Lochyhills
Item 8.
Page 181

Page 182

Page 182

Page 183

Appendix 4 – Forres Academy Site Selection 
Public Engagement - Paper Survey Analysis 
Applegrove
/ Roysvale Lochyhill
Applegrove
/ Roysvale Lochyhills
Parent/Carer of a child attending school 3 20 13.0% 87.0%
Local resident living within Associated School Group (ASG) area. 4 33 10.8% 89.2%
Primary school pupil 0 1 0.0% 100.0%
Secondary school pupil 0 0 0.0% 0.0%
Primary school staff member 1 0 100.0% 0.0%
Secondary school staff member 0 0 0.0% 0.0%
Other 0 0 0.0% 0.0%
TOTAL 8 54 12.9% 87.1%
Alves Primary School 0 1 0.0% 100.0%
Anderson's Primary School 4 19 17.4% 82.6%
Applegrove Primary School 3 32 8.6% 91.4%
Dallas Primary School 0 1 0.0% 100.0%
Dyke Primary School 1 2 33.3% 66.7%
Kinloss Primary School 2 4 33.3% 66.7%
Logie Primary School 0 1 0.0% 100.0%
Pilmuir Primary School 2 15 11.8% 88.2%
I live out with ASG area 1 1 50.0% 50.0%
TOTAL 13 76 14.6% 85.4%
Living in Applegrove Catchment + Resident 2 30 6.3% 93.8%
Living in Applegrove Catchment + Parent 1 3 25.0% 75.0%
Single Category e.g.
Only Parent
Numbers %
8, 13%
54, 87%
Single Category e.g. Only Parent
Applegrove / Roysvale Lochyhill
13, 15%
76, 85%
Catchment Areas
Applegrove / Roysvale Lochyhill
Item 8.
Page 183

Page 184

Page 184

Page 185

REPORT TO: MORAY COUNCIL ON 22 MAY 2024 
SUBJECT: INFORMATION REPORT: MORAY GROWTH DEAL
ANNUALREPORT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 On 6 March 2024 Council considered and approved (para 14 of the minute
refers) a draft version of the Moray Growth Deal (MGD) Annual Report,
covering the 2023 calendar year.   
1.2 Delegated authority was given to the Depute Chief Executive (Economy,
Environment and Finance) to approve a final iteration.  Appendix 1 tracks
changes made to the version presented to Elected Members on 6 March
2024.   
1.3 This report is submitted to Council in terms of Section (II) (20) of the Council’s
Scheme of Administration relating to a new policy matter which does not fall
within the terms of reference of any Committee.   
2. BACKGROUND 
2.1 The production of an annual report is a grant condition associated with
funding from the Scottish and UK Governments.  This report introduces a final
version of the MGD’s second annual report, covering the 2023 calendar year.   
2.2 Since the Council meeting on 6 March 2024, the draft Annual Report
document was used as the basis for the Deal’s annual conversation with
officials from the Scottish and UK Governments.   
2.3 The Annual Conversation was a constructive day of activity for the Growth
Deal and involved:   
▪ Informal ‘showcase’ sessions that provided an early sight of applications
the Digital Health project is developing along with a visit to sites in Elgin
that are due to be regenerated.  
Page 185

Page 186

▪ A formal meeting in the afternoon saw officials meet with the Moray
Council’s Chief Executive, Depute Chief Executive (Economy,
Environment and Finance and Growth Deal Senior Responsible Officer),
Head of Economic Growth and Development, Chief Financial Officer and
the Moray Growth Deal Programme Manager.  The discussion reflected
on activity progressed during 2023, with a look ahead to what is planned
for 2024. 
3. NEXT STEPS 
3.1 Following submission to the Council, the intention is that: 
▪ A graphically designed version of the annual report (draft version
provided in Appendix 2) will be made publicly available through the
Council and My Moray websites. 
▪ A press release will be issued to promote key highlights in early June. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Moray Growth Deal projects contribute to the Corporate Plan priority of
promoting economic development and growth, whilst meeting the LOIP
vision of raising aspirations, reducing inequalities in educational
attainment, providing access to employment, expanding choices for
residents, and improving livelihood and well-being.   
(b) Policy and Legal
Each MGD project has been developed to meet local, regional and
national policy agendas in line with legal requirements where relevant.   
(c) Financial implications
The production of the 2023 Moray Growth Deal annual report in itself
does not present any financial implications, but it does contain a section
relating to the finances of the programme.     
With an increasing number of projects either in delivery or in the
advanced stages of developing their full business cases, it is expected
that during the first half of 24/25 there will be more certainty around the
financial profile for the remaining 7 years of the Deal.  This in turn will
allow Finance to understand cash flow requirements that the Council
have committed to cover about the Government funding profile. 
Specifically, it will determine how much of the £4m currently held in
reserves will be required.   
The Council’s Chief Financial Officer sits on the monthly Moray Growth
Deal Programme Board at which a report is submitted for review setting
out spend against budget allocation and takes an overview of the
financial implications of the Deal for the Council as s95 Officer.   
Page 186

Page 187

(d) Risk Implications
The production of the 2023 Moray Growth Deal annual report in itself
does not present any risk implications, but it does reference risks being
managed by the Moray Growth Deal PMO that have the potential to
affect successful delivery.   
Risk is a standing item at monthly Moray Growth Deal Programme
Boards and is covered in meetings that the PMO has with each Project
Manager.   
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
Equalities and socio impact assessments for each project will be
updated as part of full business case development and any subsequent,
significant change control activity.   
(h) Climate Change and Biodiversity Impacts
As part of their review process with the Governments, Growth Deal
projects need to take account of carbon and environmental
considerations in full business cases, with net zero aspirations being
integrated into design briefs for new properties. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Economic Growth and Development, the Legal Services
Manager, the Equal Opportunities Officer the Chief Financial Officer and
Democratic Services Manager have been consulted and comments
received have been incorporated into the report.   
5. CONCLUSION 
5.1 This paper provides a final draft of the Moray Growth Deal’s 2023 Annual
report for the Council to consider and note.   
Author of Report: Michael Kelly Moray Growth Deal Programme Manager 
Background Papers:  
a) Full deal documentation (December 2021)
b) Approval of procurement requirements prior to the Housing Mix Delivery FBC
being approved
c) Acquisition of property relating to South Street redevelopment activity (relating to
both the Housing Mix Delivery and Business Enterprise Hub projects)
d) Moray Growth Deal 21/22 annual report (8 March 2023 and 24 May 2023)
e) Approval of MICM FBC
f) Approval of Business Enterprise Hub and Housing Mix Delivery FBCs
g) Moray Growth Deal 2023 annual report (6 March 2024)
Page 187

Page 188

Page 188

Page 189

ANNUAL REPORT
2022/2023
Page 189

Page 190

Cultural Quarter Consultation
at Elgin LibraryPage 190

Page 191

Contents 
1 Headline achievements 
2 Statement from Moray Council’s Growth Deal Lead 
3 Progress made throughout 2023 
Programme overview 
3.1.1     Summary of what the Deal is working to achieve
3.1.2     Status of Deal activity
3.1.3     Anticipated geographical spread of benefits
3.1.4     Synergies between Growth Deal activity and other   
economic development funding secured for Moray 
Project updates 
3.2.1 Bus Revolution
3.2.2 Business Enterprise Hub
3.2.3 Cultural Quarter
3.2.4 Digital Health
3.2.5 Early Years STEM
3.2.6 Housing Mix Delivery
3.2.7 MAATIC
3.2.8 MICM 
4 Forward look at activity planned for 2024 
4.1 Work to get all Growth Deal projects into delivery
4.2 PMO milestones to be achieved
4.3 Factors that require action or future delivery could be impacted
4.4 Monitoring the benefits to be realised by the Deal 
5 Financial summary 
5.2 Funding sources for Deal activity
5.2 Funding drawn down from the Scottish and UK Governments Q4
22/23 to Q3 23/24 
6 2023 communications activity 
7 Programme structure and governance activity 
7.1 Structure of Moray Growth Deal activity and Officers involved 
7.2 Summary of assurance activity progressed during 2023
7.3 Audit activity undertaken during 2023
2
3
4
4
4
5
6
7
8
8
14
18
23
28
34
38
41 
45 
45
46
47
47 
48 
48
50 
51 
53 
53
55
58
1
Page 191

Page 192

2
1. Headline achievements
Bus Revolution project receives Council and Government
clearance to enter delivery.
Digital Health’s Demonstration, Simulation and Environment
(DSE) Space opens in UHI-Moray, providing a location for
residents, digital developers and health care professionals to
collaborate on healthcare digital applications.
Fraser Livingstone Architects appointed to design phase 1 of
the Dallas Dhu (Forres) housing masterplan.
Enhanced on demand bus services take to the road,
rebranded as m.connect.
Moray Growth Deal Board approves full business cases for
the Business Enterprise Hub, Housing Mix Delivery and MICM
projects, enabling them to move to the next stage of scrutiny
by Government Policy Advisors and Moray Council.   
Bus Revolution project receives a Ministerial Launch in
Aberlour.
LDN architects appointed as lead design partner for the
redevelopment of Elgin Town Hall as part of the Cultural
Quarter project. 
Drop-in event held regarding regeneration plans for South
Street in Elgin, which involves the Business Enterprise Hub
and Housing Mix Delivery projects.
Q4 
22/23
Q3 
23/24
Q2 2
3/24
Q1 
23/24
Page 192

Page 193

3
The target is that at least seven of the
eight projects will enter delivery during
2024.  This presents a solid foundation
to start tracking the benefits Growth
Deal activity will deliver for Moray.  It
will also be important that the team
considers how activity interacts with
other funding programmes we’ve been
successful in securing during 2023
(£18.3m from the Levelling Up Fund
and £20m from the Long Term Plan for
Towns Fund), with a view to minimising
risks and maximising opportunities to
enhance benefits wherever possible.   
Cllr Marc Macrae
2 Statement from Moray Council’s Growth
Deal Lead 
Throughout 2023 I’ve seen first hand
the significant amount of work being
delivered by Council Officers and
partner organisations to progress the
Growth Deal. In briefing sessions with
fellow Members, MGD Board meetings
and in conversations with key officers,
I’m excited to see plans start to
crystalise for the facilities and services
we’re working hard to put in place. 
The Growth Deal is focusing on key
improvements we need to see in
Moray, including generating high value
skills, growing businesses, driving
innovation and making Moray a better
place to work, live and visit. 
The launch in May 2023 of the
enhanced, rebranded m.connect Bus
Revolution on demand public transport
service presented the first opportunity
for many to see how the Deal will help
residents and businesses. We’re
humbled by the response seen so far
as passenger numbers currently
exceed our targets.  This project is
critical if we are to achieve our
objective  of reducing transport
barriers to work, education and leisure.  
Our ‘on the ground’ activity will grow
significantly during 2024 and I look
forward to the opening of the
Manufacturing Innovation Centre for
Moray (MICM) Hub at the Forres
Enterprise Park next autumn in what
will be our first direct intervention for
businesses.   
Page 193

Page 194

4
3 Progress made from Deal signing on 
20 December 2021 to the end of 2022 
3.1 Programme overview 
The Moray Growth Deal was signed on 20 December 2021 by Iain Stewart MP (UK
Government), Cllr Graham Leadbitter (Moray Council) and Kate Forbes MSP
(Scottish Government).   
3.1.1     Summary of what the Deal is working to achieve 
Throughout 2023 the Growth Deal Programme Management Office (PMO) worked
with each of the eight Project Managers to ensure activity aligns with the four main
interventions the programme aims to deliver:   
Retaining and attracting young people / families (16-29 yrs) to live and work
in the area
Addressing occupational segregation and gender inequality in employment,
including the significant gender pay gap and under-employment issues for
women
The creation of new high quality jobs in existing sectors and diversify the
region’s economy into new high value areas
The creation of opportunities across Moray which help secure the future
prosperity of its many communities 
A later section of this report will focus on work being progressed to deliver a
Benefits Realisation and Monitoring Plan, with the following outcomes expected to
be delivered for the region: 
Direct and indirect creation of over 
3,500 jobs
450 of the 3,500 jobs will result
directly from Growth Deal projects
50,000 more tourists will be
attracted to Moray
Over 300 new affordable
homes will be constructed
450 businesses will be supported
to scale, increasing Moray’s economic
productivity by £82m
Creation of new and improved
educational, cultural and business
innovation facilities
Page 194

Page 195

5
A very distilled view of the Deal is that the eight main projects are working to make
interventions against three main areas of focus:   
3.1.2 Status of Deal activity
With the Scottish and UK Governments each providing funding of  £32.5m over a
10 year period, Deal activity will be delivered in a phased approach up to
December 2031.  That said, the PMO is working with project teams to create clarity
on what each project will deliver for Moray during 2024 , with a view to: 
Defining what the Deal is going to deliver when, where and how.
Maximise time over the 10 year funding period to make sure work runs as
efficiently as possible to limit expenditure peaks over and above Government
funding, which the Council committed to when the full deal was agreed in
December 2021.   
A high level summary of the status of each project is outlined below:   
Generate high value 
skills
MAATIC 
EY STEM
Create high value
employment
Make Moray a better
place to live and work
Bus Revolution
Cultural Quarter
Housing Mix Delivery
Digital Health
MICM
Business Enterprise Hub
Closure
Project
complete and
being closed
Delivery
Project in
delivery
FBC
Full business
case
OBC
Outline
business case
SOC
Strategic
outline case
High level phases of the lifecycle of projects:
Project                                                                  Lifecycle stage                                          
SOC             OBC             FBC                            Delivery     Closure
Bus Revolution                Complete   Complete    Complete                  In delivery
Business Enterprise       Complete   Complete    Awaiting
(BE) Hub                                                                      approval
Cultural Quarter             Complete   Complete    Approval expected 
Q2 24/25
Digital Health                  Complete   Complete    Complete                  In delivery
Early Years (EY) STEM    Complete   Complete    Approval expected                                                                                      
Q2 24/25
Housing Mix Delivery    Complete   Complete    Approval granted    In delivery                                                                                      
Q4 23/24
MAATIC                             Complete   Complete    In development
MICM                                Complete   Complete    Approval granted    In delivery                                                                                      
Q4 23/24
Page 195

Page 196

6
3.1.3 Anticipated geographical spread of benefits
As each project works to either draft their full business case or advances delivery
activity, a clearer picture is emerging on the geographical spread of Deal activity
throughout Moray.  The completion of project monitoring plans and a Benefits
Realisation Plan during 2024 will provide finer detail but activity has been grouped
into one of two main categories: 
Infrastructure
(physical or
virtual) with a
Moray-wide
footprint 
Moray-wide
service offerings
to be established,
operated from a
centralised facility
Virtual healthcare applications are being
developed through the Digital Health project that
aim to enable conditions to be managed at home,
reducing time spent in clinical settings.  
On demand m.connect services will be expanded
throughout Moray on a phased basis, breaking
down barriers to accessing employment
education or leisure.
Through a combination of physical hubs, a mobile
solution and outreach activity, STEM learning
targeting early years children will be available
Moray wide.
Comprising of two phases that will run up to
2031, Housing Mix Delivery will enable the
construction of affordable and private homes
throughout Moray, making it easier to access
homes to help people stay in the region. 
Support to drive growth and innovation in the
manufacturing sector through the MICM project
that will create a hub at the Forres Enterprise
Park.
The construction of a Business Enterprise Hub on
South Street in Elgin will help micro and small
businesses to grow as well as offering a variety of
education and professional learning
opportunities.
An aerospace and advanced technology campus
will be developed to support learning as well as
R&D opportunities not just for residents of Moray,
but wider afield. 
Page 196

Page 197

7
3.1.4 Synergies between the Growth Deal and other economic development
activity being progressed within Moray
The Growth Deal Team is conscious that to create the right environment for
success, alongside managing interactions between projects, activity being
progressed by other economic development programmes needs to be considered.
This is not only to ensure they have no negative impact on Growth Deal objectives
and benefits to be realised, but that any positive opportunities to drive efficiency
or to create stronger benefits are maximised wherever possible. 
At a strategic level, the Moray Growth Deal Programme Board includes
representatives from the Scottish and UK Governments, along with the Council’s
Economic Development Team and Highlands and Islands Enterprise. Collaboration
will be essential in understanding the funding landscape and to manage any
potential interactions other activity has with Growth Deal activity. 
Operationally, the Growth Deal PMO is working to generate clarity on how funding
secured for Moray during 2023 (£18.3m from the Levelling Up Fund and £20m
from the Long Term Plan for Towns Fund) interacts with planned activity, including
the impact on council staff resources, the organisations / companies needed to
support the work and the nature of communications planned with key
stakeholders including businesses and residents.   
m.connect official launch 
with Neil Gray MSP
Page 197

Page 198

8
Value £4.32m 
(£4m capital, £322k
revenue) 
Lead Body
The Moray Council
PROJECT UPDATES
3.2.1 Bus Revolution
Current status
Entered delivery in March 2023, with the
first rebranded m.connect on demand
services starting in May 2023.   
Project vision 
Increase the number of people using
public transport to get to and from rural
areas for work, education and leisure.
m.connect official launch 
with Neil Gray MSP
Page 198

Page 199

9
Project summary 
Bus Revolution is an innovative project that aims to increase the number of people
using public transport to get to and from rural areas to places of work, education
and leisure, providing a step change in availability of public transport right across
rural Moray. 
The project will provide a flexible demand responsive service, operating when and
where needed in an easy-to-use way, utilising app-based technology that will allow
journeys to be booked up to one hour before they’re needed.   
Bus Revolution will receive £4.3m in funding from the Scottish Government. This
will be used to cover the capital investment required to: 
Set-up operational systems
Provide branding and marketing
Purchase electric vehicles 
Provide associated charging infrastructure to deliver an efficient and robust
transport network. 
Headline achievements 
Since the approval of the Full Business Case in March 2023, the main focus of
activity during 2023 has been delivering phase one of the project plan starting in
Q1 23/24. Activity completed to date has included the: 
Implementation of a real time booking and management system (Op Porta,
Driver app)
Introducing new operating zone & fares models
Upgrading electronic ticketing machines (ETM)
Re-branding vehicles
Creating a service website
Production of key policy documents supporting the service
Development and execution of a marketing and communications campaign 
m.connect official launch 
with Neil Gray MSP
Page 199

Page 200

The first phase of m.connect service enhancements
introduced the following additional service provision: 
Timetabled service (309) linking Cullen-Buckie-Keith
to the rail network (0515-2030hrs Mon-Fri)
Enhanced timetable for service 366, linking
Aberlour-Archiestown-Elgin (0900-030hrs Mon-Fri)
m.connect on-demand extended operating hours
in Buckie, Keith and Speyside (0630-2030hrs Mon-
Fri) 
To date, m.connect has shown strong growth, gaining more than 5,000 additional
passengers from the same period in 2022. There has also been a shift in how the
service is booked, with almost one third of bookings now being made via the
m.connect passenger app. To date over 2,000 downloads of the app have been
registered through both Google Play and the Apple App Store. 
On 28 August 2023, The Scottish Government’s Cabinet Secretary for Wellbeing
Economy, Fair Work and Energy, Neil Gray MSP, officially launched the m.connect
service at Speyside High School. A month later, m.connect was nominated for
Scottish Council for Development & Industry (SCDI, now rebranded to ‘Prosper’)
Highlands & Islands Business Excellence Award for Innovation, where the service
was awarded second place.   
10
m.connect passenger figures m.connect booking method
7,488
17,047
Page 200

Page 201

11
Key milestones 
Risks and issues that require management by the project
team during 2024 
Effects 
If performance is not as
hoped, the Council’s
revenue commitment
may need to increase to
support the service and
capital return on
investment calculation
may become less
favourable.   
Potential for capacity
issues to run services, if
drivers are not
recruited in sufficient
numbers, and maintain
vehicles or the cost
increases as the work
needs to be carried out
externally.
Mitigation 
Early performance has
been strong and the
project is being proactive
in monitoring
performance data. Project
in-life reviews will take a
detailed look at data,
providing an opportunity
to review the service
model or future vision to
ensure it remains aligned
with capital and revenue
budget allocations. 
Continuous advertising of
positions, analysing data
from different stages of
the process to better
understand and mitigate
challenges faced. The
Team will also work to
minimise staff turnover.
Risk 
Actual performance
varies negatively from
assumptions built into
the full business case
(passenger numbers,
fare income etc).) 
Recruitment of staff
(drivers and vehicle
technicians) could
prevent or limit service
expansion plans.
Vehicle & Charge Unit Procurement
m.connect pilot of weekend services
Q1 24/25
Q1 24/25
Page 201

Page 202

Focus on…efficiency through analysis 
One of the major benefits of the new booking and management system supporting
m.connect, is access to a range of reporting tools that inform service optimisation
recommendations. The recommendations aim to improve service efficiency by
monitoring: 
1. Who travels and when (known as ridership).
2. The current demand profile by hour of the day (The balance of supply and
demand), Inc passenger per vehicle hour metrics (PpVH).
3. Ride sharing and vehicle utilisation. 
4. Trip requests by location, success rates and area specific influencers affecting
booking success, such as service zone restrictions, vehicle allocation within
area and service / driver break periods. 
Optimisation sessions are then conducted with the operations team to discuss
improvements in service delivery, but also highlight potential deteriorations in
other service metrics. These sessions occur every 3 months, allowing suitable
monitoring of changes to evidence their impact on the operation.  To date, these
sessions have improved ride sharing on the service from 42% to 65%, generating
an additional 23% seating capacity to accommodate more journeys.   
12
Page 202

Page 203

13
By way of insight, data from Forres exhibits high demand and has shown
considerable unmet demand. In order to meet this demand, recommendations
included: 
1. Modification of vehicle availability, i.e. extending Vehicle 2’s operating hours to
match/be similar to Vehicle 1. Unaccepted rides are mainly falling in the period
with only 1 vehicle operating.
2. Adding an additional vehicle would be beneficial in Forres, improving access to
the service. 
Using the evidence that is being gathered, the team are looking to enhance the
service offering further, with key areas of focus including: 
1. Private service functions:  The ability to add a bespoke route within the
operation to accommodate specific needs including education, health & social
care, sports groups, after school clubs.
2. Group booking function:  Enabling social groups to request services that
involve one request for a trip to a common destination but with multiple
collections and drop offs.
3. Integrated ticketing:  Fares validated on both on-demand and timetable
services. 
Matched Bookings
within requested time
window 
Cancelled Bookings by
customer 
Rejected booking by
customer (alternative
offered if initial
booking cant be
matched) 
Rejected booking by
service (demand
exceeding capacity)
Page 203

Page 204

Project summary 
A key characteristic of Moray is that it has over 3,000 small and medium sized
enterprises. This represents a considerable growth potential if these businesses
can be helped to scale-up. Supporting the upskilling and growth of these
businesses, the Business Enterprise Hub (BE Hub) will be a flexible space for
business innovation that is accessible to businesses and students alike, providing
an inspirational environment that encourages entrepreneurial thinking. Funding
for the facility will be provided by the Scottish Government (£3.3m) and Highlands
and Islands Enterprise (£1m), with the Scottish Government also provided £2m in
revenue to support service delivery.     
It will be a productive environment where learning spaces and real work
environments coincide, where flexibility of usage allows students, lecturers,
researchers, and practitioners to share the same space, and where business
support functions can be located with teaching and research skills to develop and
support Moray’s future entrepreneurs and their workforce.  
There are synergies between the BE Hub and other Growth Deal projects including
Moray Aerospace, Advanced Technology, and Innovation Campus (MAATIC) and the
Manufacturing Innovation Centre for Moray (MICM). Collaboration is ongoing to
understand the target audience for each facility and any potential for overlap to
ensure they’re effectively managed.   
14
Value £6.3m 
(£4.3m capital, 
£2m revenue) 
Lead Body
University of
Highlands and
Islands, Moray
College
3.2.2 Business Enterprise (BE) Hub
Current status
The full business case has been
developed and final clearances to enter
delivery will be sought once the recently
identified revenue shortfall has been
addressed 
Project vision 
Provision of education, research, and
business support functions to support
new business start-ups, whilst helping to
upscale existing micro businesses.
Business Enterprise Hub
design conceptPage 204

Page 205

15
Headline achievements 
RIBA stage 2 continued through Spring 2023, technical design elements of RIBA
stage 3 were included such as electricity and Wi-Fi cabling, plumbing etc. RIBA
stage 3 officially launched in November and is ongoing into January/ February
2024.
MAATIC, MICM and the BE Hub have developed a clear synergies document that
will be shared in the appendices of each FBC.
The Full Business Case (FBC) was developed throughout the year and has been
approved by the MGD Programme Board and the Moray Council.  Final 
clearances from the Governments and the UHI Board will be progressed once
the recently identified revenue shortfall has been resolved.  
Briefing and consultation sessions have been held with Moray Councillors, UHI
Moray staff, Moray Business Assembly, all positively received with clear demand.
The BE hub forms part of the South Street regeneration project, designs have
been exhibited at a public engagement session on 16 December 23 which
attracted over 600 visitors.
Memorandum of Understanding signed with Moray Council in December. 
Key milestones 
To progress the aims of the project, the following key milestones are identified for
2024.  These include milestones for the construction of the facility as well as the
Hub’s service offering. 
Full Business Case approved
Initial site survey/ exploration
Q1 24/25
Q4 23/24
RIBA Stage 3+ Design CompleteQ4 23/24
RIBA Stage 3 Design Cost Plan Q4 23/24
Planning ApplicationQ4 23/24
RIBA Stage 3 + Tendered Cost Q4 23/24
BE hub brand development to startQ4 23/24
RIBA Stage 4 Design CommencesQ4 23/24
Accredited course proposals/research and innovation
programme further developed
Throughout
2024, but
concluding in
Q3 24/25
Page 205

Page 206

In the expectation that FBC and planning permission approval stages proceed as
planned, construction will start in October 2024 and last for approximately 18
months. The Hub “working” model is under development to enable a smooth
transition upon building opening/launch with plans in 2024 to develop the BE hub
brand. In the background regular project board and stakeholder meetings are
ongoing to support the development of the Hub function. 
Risks and issues that require management by the project
team during 2024
16
Effects 
Work to rescope the
facility has already
taken place to ensure it
is delivered within the
budget allocation.   
Further work required
before the FBC can
continue it’s assurance
journey. 
Could result in delays to
construction activity or
the need to revise the
vision for the site, both
of which could affect
time, quality, and cost
project parameters.
Mitigation 
Cost mitigation through
design specification and
realisation of efficiencies
due to co-location with a
Housing Mix Delivery site. 
The revenue funding
model is being reviewed
with a view to lowering
the amount required
without impacting the
service or quality. 
Alternative revenue
solutions are also being
explored. 
Detailed site survey work
to be progressed as soon
as possible. 
Contingency integrated
into the budget to offset
any potential issues
identified.
Risk/Issue 
Escalation of build costs 
Revenue shortfall
identified 
Potential site issues e.g.,
ground works and
protection / integration
of existing heritage (as
yet unknown)
Planning ApprovalQ1 24/25
RIBA Stage 4 Design Complete Q1 24/25
RIBA Stage 4 Costs Q2 24/25
Construction commencesQ3 24/25
Page 206

Page 207

17
Area of focus….emerging RIBA stage 2 design vision for the
facility 
RIBA Stage 2 was the focus for the first part of the year, feeding into the
development of the FBC. Monthly meetings working through design versions were
held between UHI Moray, Oberlanders (architects), Robertsons, and Moray Council
(design images included below). 
The size of building from the original plan has been reduced by one-third to fit the
present value of the fixed capital funding allocated, design was critical to ensure
the maximisation of space available. Reducing the size does not disadvantage the
project, with the change accommodated by adjusting the need from full co-location
of public agencies to the hybrid working model now represented in the project.
Through developing the designs for RIBA stage 2 costs estimates were prepared to
demonstrate the financial sustainability of the BE hub project.   
The location of the BE hub will be on South Street in Elgin and will form part of the
South Street regeneration project. Over three floors, the hub will be where the
Junners Toy Shop previously was. Having a conservationist architect within the
team has ensured the building will incorporate some of the original features, such
as the scalloped top, as shown in the image below of the front exterior. The glass
frontage is important to ensure the building becomes a hub in it’s true sense,
welcoming and apparent from the exterior. 
The hub will have a high profile in the town centre as it’s sited near the main UHI
Moray campus and the city centre with an aim to make engagement accessible.
The hub will provide an inspirational environment, externally and internally and
one that really encourages entrepreneurial thinking. 
The BE hub will form part of a multi-building site shared with the MGD Housing
Mix project. The image above reflects the proposed back exterior to the BE hub
including the public realm space, shared with the Housing Mix project, and
developed by Moray Council. The back exterior of the hub, also depicting a glass
frontage, with the aim again to make engagement activity clearly visible and
encouraging. 
Business Enterprise Hub design conceptPage 207

Page 208

18
Value £32.3m
(£31.6m capital,
£700k  revenue) 
Lead Body
The Moray Council
3.2.3 Cultural Quarter
Current status
Working to submit project Full Business
Case to the MGD Board in late Q4 23/24
with a view to entering delivery by Q2
24/25 
Project vision 
Investment in key local assets, including
the refurbishment of Grant Lodge, the
Town Hall, and investment in the region’s
tourism infrastructure designed to
leverage in private sector investment in a
new hotel. 
Interior of Grant LodgePage 208

Page 209

Project summary 
The Cultural Quarter project is working to advance the development of
inspirational, accessible, public facing cultural attractions in the centre of Elgin.
Significant investment is in place from four partners: 
Scottish Government £12.7m
UK Government £3.5m
Moray Council £3.9m
Highlands and Islands Enterprise £2m 
Funding will be used to redevelop two important B listed historic buildings in Elgin:
Elgin Town Hall (Phase One) and Grant Lodge (Phase Two). Combined, these
phases of activity will provide an enhanced cultural offering which increases city
centre activities day and night, and highlights the region as an inspirational
destination of choice. 
Each element will be linked together by improved public spaces and physical
connections, creating a vibrant space in the heart of Elgin which supports inclusive
economic growth and cultural expansion within the city and wider region.
Collectively they’ll help to attract and retain talent whilst increasing tourism region
wide. Working with key stakeholders throughout Moray, these vibrant new spaces
will act as a springboard for cultural place-based regeneration, providing
opportunities for local people and visitors alike whilst
supporting the creative, heritage and tourism
sectors in Moray to collaborate, thrive and
grow. 
The creation of modern fit for
purpose venues and a visible,
aspirational cultural centre in
Elgin will encourage private
sector investment in a new
hotel at a complementary
site (Phase Three),
meeting a longstanding
requirement for
additional, quality,
hotel accommodation
in Moray. 
19
Doors Open Day at Grant LodgePage 209

Page 210

Headline achievements 
Cultural Quarter development workshops and Moray culture & heritage
mapping study complete (working with 60+ regional and sectoral partners).
Specialist economic and cultural consultants EKOS and Creative Services
Scotland appointed to update Business Plans for Elgin Town Hall and Grant
Lodge, review options for a CQ governance model / operating organisation and
update the project impact assessment.
Cultural Quarter phasing and delivery plan RIBA stage 2 report complete. This 
presented proposals for how external sites and spaces can be improved and
connected to lay the foundations for a successful Cultural Quarter with clear
links to the High Street.
Full fabric condition survey completed for Grant Lodge, including
recommendations for conservation standard safeguarding/enabling works and
costs.
LDN Architects appointed as lead consultant in multi-disciplinary design team to
progress the plans for a transformed Elgin Town Hall. 
Key milestones 
20
Updated business plans, operational models, and
Impact assessment for CQ venues
Capital and transitional programme for Elgin Town Hall
confirmed
Q4 23/24
Q4 23/24
Full Business Case submitted to MGD Programme
Board
Grant Lodge design team and cost consultants
appointed.
Q4 23/24
Q4 23/24
Elgin Town Hall RIBA stage 2 complete
Elgin Town Hall works tendered, with updated annex
prepared for governance that adds to detail contained
within the FBC
Q4 23/24
Q3 24/25
Elgin Town Hall works complete
Grant Lodge works complete
Q4 26/27
TBC - 2027
Elgin Town Hall Works start on site
Grant Lodge works tendered, with updated annex
prepared for governance that adds to detail contained
within the FBC
Q2 25/26
Q3 25/26
Page 210

Page 211

21
Risks and issues that require management by the project
team during 2024 
Effects 
Impact on
deliverability of the
project which could
in turn affect
outcomes and
benefits. 
Lack of resources
leads to project
delays with
operational/busines
s impacts, inability
to appoint the
correct professional
services leads to
capital programme
delays and cost
increases which
may affect ability to
deliver full vision. 
Any impact to the
sustainability of the
charity could
negatively affect
the project’s ability
to deliver full
project outcome
and benefits.
Mitigation 
Careful planning to ensure
designs deliver objectives
Pursue all additional funding
routes
Appoint client-side cost
consultant and construction
support through HUB North
Engage with contractors early,
regular review 
Planning to ensure
experienced input for each
project strand understood
Early and continual
engagement with key relevant
sectors
Attractive and well-developed
briefs which highlight profile
and benefits of the CQ
Engagement with Hub North
Continual re-assessment of
programme risk and
interdependencies across
internal and external teams
Share info and learn from
other MGD projects. 
Sub-group of the Cultural
Quarter Project Board
established to oversee
transitional arrangements
Capital programme to be
appraised against Elgin Town
Hall programme to limit the
loss of significant income
generation opportunities
Transition management costs
integrated into Cultural
Quarter project budgets
Risk 
Inflation in
construction costs
means buildings
exceed budget
allocation. 
The project does
not have sufficient
resources to
manage both the
complex capital
redevelopment
programme and
associated business
and relationship
development
required. 
The project is
working to ensure
Elgin Town Hall for
the Community has
options that enable
it to operate whilst
redevelopment
work takes place,
but any delays
could impact their
community and
contractual
relationships.
Page 211

Page 212

Focus on….LDN Architects appointed to lead transformation
of Elgin Town Hall 
During 2023 the project team worked closely with Elgin Town Hall for the
Community and a wide range of other key stakeholders, from Elgin Community
Council to the National Theatre of Scotland, to develop a detailed brief which
outlined current building issues and future aspirations clearly. 
Following a two-stage public procurement process, which generated 23 notes of
interest, LDN impressed the panel with their clear, thoughtful approach, and
creative concept designs to come out top from a selection of prestigious practices
from across the UK. LDN Architects and a number of consultants within their
design team have bases in the north of Scotland including employing new local
members of staff specifically to work on this project, assisting the Cultural Quarter
in delivering our commitment to Community Wealth Building. 
Work is now underway to progress RIBA Stage 2 concept designs in line with the
first phased submission of the Cultural Quarter Full Business Case which is due
late Q4 23/24 / early Q1 24/25. The proposed redevelopment will overcome
limitations of the current building to create a welcoming 21st century performance
and community space which builds on the success of the existing venue. Redesign
of the building will improve circulation, acoustic separation, environmental
performance and add a new multi-use studio space to enhance and widen
programming. Updating the already popular Elgin Town Hall will enable the venue
and Elgin to take its rightful place as the third major cultural centre in a row of
important northern capitals. 
22
Elgin Town Hall aerial view proposal
Picture courtesy of LDN Architects
Page 212

Page 213

Project summary 
The Rural Centre for Excellence (RCE) is a complex programme of Research &
Development based assets (DSE and R&D infrastructure) in Moray. It links to
developing a portfolio of five Living Labs as a vehicle for exploring novel concepts,
iterating solutions and evaluating innovations to complex health and care
challenges. Since the programme started in late 2021, a number of important key
achievements have been realised - particularly over the last 18 months where the
RCE innovation team have been mobilised.  
At the end of 2023 the project submitted a change request that was approved by
the MGD Board seeking to extend the project by a year to May 2026.  This is in light
of the Rural Centre for Excellence securing a longer term funding agreement from
the Scottish Government.  The additional time will be used to create a more
holistic, connected set of healthcare applications. 
The £5m of capital needed for this project is being provided by the UK
Government.    
One key lesson learned by RCE is that the Moray region and partners were not fully
primed to support innovation and digital from the outset. Intensive work is now
ongoing with Health and Social Care Moray (H&SCM) and the wider community to
support them in developing capacity and aligning with their strategic priorities.
There is a notable commitment from H&SCM, who has recently included the Living
Lab themes in their long-term strategic planning. In common with social care
capacity across the UK, pressures in this sector does constrain ability to engage
and deliver at pace. The digital health initiative funded by the Moray Growth Deal is
an opportune investment to support R&D and sector-wide innovation (which is
likely to increase productivity).  
23
Value
£5m capital 
Lead Body
Rural Centre of
Excellence (RCE) for
Digital Health and
Care Innovation
3.2.4 Digital Health
Current status
Achieved approval for the project Full
Business Case in Q3 21/22 and is now in
delivery 
Project vision 
Creation of an anchored demonstration
and simulation environment (DSE) and
Living Lab testbeds for the Moray region.
Page 213

Page 214

Strategic Landscape  
The health and care sector continues to face challenges as increasing demand for
services exceeds the ability of services to accommodate this. That said, the
innovation landscape in the UK is experiencing significant momentum with various
initiatives underway to harness technology, data and collaborative efforts to
enhance healthcare delivery. The main trends to note are:  
1. Increasing technology integration to bring digital health solutions into
healthcare systems and provide more personalised care.  
2. Data utilisation efforts to leverage vast amounts of data to explore ways to
identify trends, predict changes, personalise care and optimise resource
allocation via data-driven approaches. 
3. Focus on prevention and well-being: There is a growing shift toward
preventative care and holistic well-being. Initiatives aimed at promoting healthy
lifestyles, mental health support, and early intervention to prevent chronic
conditions are gaining traction.  
The landscape in the health and care sector is ever evolving. Advancements in
technology, changes in policy, and societal needs continue to shape the direction
of innovation in the UK, against an uncertain funding backdrop.  
Headline achievements 
Living Labs
During 2024,Living Lab 1 (Supported Self-Management) will progress through it’s
development phase and into testing.   
Living Lab 3 (Care in Place) has progressed significantly over the last year, with
two key assets (both fundamental to the full RCE infrastructure) developed, and
the user testing phase nearing completion. The first asset to emerge for this
living lab is the Community Connections @Moray platform and is the spotlight
focus in this year’s report. The second asset is the creation of a Personal Data
Store (PDS).  The scope of the work is around integrated care, and looking at
equipping citizens with a Personal Data Store that allows them to keep a copy of
their data online and take it with them as they move between different health,
care, third sector and independent organisations.  It will also potentially contain
information from health professionals, making it easier for them to understand
the healthcare journey of patients. 
Living Lab 2 (Long Term Condition Co-Management) NHS pathway was activated
in 2023, as definition and initiation workshops highlighted a need to find digital
solutions to support access deprivation and the sustainability of a clinical
service to support those with a type 2 diabetes diagnosis. 
Living Lab 2 (Long Term Condition Co-Management) community pathway was
also activated and workshops took place with the Occupational Therapy (OT)
service to develop a call to industry to develop digital solutions to improve
access to the service and reduce waiting times.
Significant re-scoping for Living Lab 4 (Smart Housing/Smart Communities) and
Living Lab 5 (Mental Wellbeing) with realignment of the site from Dallas Dhu to
Leanchoil Trust in partnership with the Housing Mix project.
24
Page 214

Page 215

Developing key enabling R&D digital infrastructure to allow the work to take
place.
Progressing information governance and EQIA assessments. 
Skills
A skills grant was awarded to UHI Moray to develop an online learning module
"Digital Essentials for Carers” comprising four short units – learners receive a
digital ‘badge’ on completion of each unit and a digital certificate to confirm
completion of the overall module, which can support the Continuous
Professional Development (CPD) of paid staff.
SkillsFest event took place at UHI Moray in November 2023 - the key focus of
this R&D skills-related gathering was to share the RCE skills work and outline
how innovation assets and strengthening the skills and education pathway can
enable the region to become more attractive, increasing the skills across the
system.
Curating skills and activities that support capability and capacity building for the
ecosystem that will need to understand how to innovate and use digital tools
(e.g., Micro credentials and upskilling out-reach activities). 
Procurement
Dynamic Purchasing System (DPS) was activated as the innovative procurement
vehicle for RCE calls to industry. 
Comms and Engagement
The Demonstration and Simulation Environment (DSE) was set up and launched
early in 2023. A launch event was held in April to mark the occasion, with a
closed session in the morning with invited delegates and an open session in the
afternoon for the general public to experience the DSE.
Procurement of a collaboration platform to support the Digital Innovation Hub
and Citizen Panel activities for the RCE project.
Developing a network of stakeholders and a strong project board including sub
working groups aligned to thematic areas (e.g. skills, sustainability).
Developing international opportunities and hosting international visitors at the
DSE in Moray.
Reaching over 300 participants locally, over 60 registered for the RCE citizen panel. 
Evaluation
Strategic Evaluation Partner contract was successfully appointed to University of
Highlands and Islands with the draft evaluation framework being developed. 
Sustainability and inward investment
RCE Sustainability working group was set up and an outline sustainability plan
has been developed by the Commercial Innovation Lead.
Supported bid-development in the region including a successful community
research network funded through UKRI and further digital inclusion funding
from SCVO. 
Strategic
Internal audit completed in December 2023 with positive feedback received. 
25
Page 215

Page 216

Key milestones 
Risks and issues that require management by the project
team during 2024 
26
Effects 
Has the potential to
cause slower
uptake in support
for the project
which may cause
delays in reaching
milestones.
Mitigation 
Change request approved
during Q4 23/24 that extends
project into 2026. Provides
more time for the project to
develop effective
relationships with all partners
to secure the necessary
support to complete
deliverables.
Risk 
Ability for key local
and regional
stakeholders to
support project
innovation activity.
Living Lab 1 and 3 to move to real world evidence stage
Development activity for  living lab 2 to commence for
community supported diabetes pathway
Q1 24/25
Q1 24/25
Invitation to tender launched via the DPS for
Occupational Therapy Service support (living lab 2)
Living labs 4 and 5 to commence
Q1 24/25
Q1 24/25
Page 216

Page 217

27
Focus on….Community Connections app development  under
living lab 3 (Care in Place) 
Throughout the RCE project and broader DHI engagement, it has been repeatedly
highlighted by citizens and professionals that there is a need for better access to
information and services with a reduced need for the user to re-tell their story. The
Care in Place project team with broad stakeholder representation, have iteratively
codesigned the ‘Community Connections @Moray’ (CCM) platform to offer this in a
one stop shop. 
With an initial focus on unpaid carer need, the CCM platform provides information
for both the cared for, and the unpaid carer, through a holistic, verified and
filterable directory of community, third sector, health and care services and
resources. The primary aim is to support self-management and enable access to
the right information at the right time, with sign posting and soft referral where
appropriate. By registering with a name and email address, users will also have
access to an ‘about me’ section where they can record their own journey and
personally significant information for automated re-use in referral to a selection of
community services. 
This platform has been developed throughout 2023 and will be tested in the Forres
and Lossiemouth areas in 2024, along with the Personal Data Store. As a core
infrastructure asset for the RCE, this platform will continue to grow and develop
along with other living lab activity. 
Page 217

Page 218

28
Value £6.4m
(£4.8m capital,
£1.575m revenue) 
Lead Body
The Moray Council
3.2.5   Early Years Science, Technology,           
Engineering and Mathematics           
(STEM)
Current status
Working to submit project Full Business
Case to the MGD Board Q4 23/24 FY, with
a view to securing clearance to enter
delivery by June 2024. 
Project vision 
To raise the aspirations of children age 3-8
in Science, Technology, Engineering and
Maths (STEM)
Page 218

Page 219

Project summary 
The Early Years STEM project will see investment of £4.8 million of capital funding
from both the Scottish Government and Moray Council. The Scottish Government
will commit up to £3.5m and Moray Council £1.3m. Moray Council will meet
revenue requirements (£1.575m) that includes operational costs and dedicated
staffing provision for the duration of the project. 
The nature of work is changing, and where Moray has historically relied upon
traditional manufacturing and retail business, in the future there will be more high
level, technology based occupations. Creating more appeal for STEM related jobs is
important to facilitate the evolution of skills required by the future jobs market,
and to ensure Moray is resilient in the future.   
Early Years STEM aims to encourage young people to enter into a STEM related
career when they leave education and focuses on STEM engagement with children
in their early stages of learning (age 3-8). The project develops a STEM learning
ecosystem in the Moray area, through the creation of specialist learning
environments and experiences, access to training and resources, and the creation
of a STEM learning network involving key delivery partners, upskilled staff,
volunteers from industry and the wider community. 
This innovative development will build on existing educational practices and
initiatives, and will create the necessary infrastructure to support a STEM skills
pathway from early years through to broad general education and beyond. 
The project will invest in state of the art facilities in community settings throughout
Moray, each offering a unique experience that can be delivered flexibly across the
region, including mobile and outreach offerings. These Hubs will aim to inspire and
enhance the STEM learning experience of children and staff through age
appropriate, curriculum aligned and industry related STEM experiences, and will
offer accessibility to parents, employers and the wider community, thereby
allowing inter-generational learning to take place. 
The aspiration of this strategy is to close the equity gaps in participation and
attainment in STEM, ultimately leading to more young people choosing STEM
occupations at a later stage in their lives.  ensure they’re effectively managed.   
29
Page 219

Page 220

Headline achievements 
Significant progress has been made during 2023 with the development of
infrastructure, operational plans and partnership arrangements.   
Sites have been identified for all four STEM centres, with particular focus on
planning for the first of these located within Elgin Library.  A multi-disciplinary
design team led by Moray Council has been appointed and early architectural
proposals developed for the Elgin facility.  Planning will continue into 2024 as
proposals are developed for the satellites sites in Forres and Buckie, as well as a
unique outdoor environmental education centre in a central location. 
These facilities will be complemented by a robust outreach provision that includes
a mobile offer and STEM Lending Resource, delivered in collaboration with UHI
Moray’s STEM Outreach team and with support from key STEM providers across
Moray. UHI Moray’s Lend a Lab initiative is now being offered to Moray schools and
2024 will see partners adopt an iterative and collaborative approach to further
develop this model and extend the reach of STEM engagements from early years
through to primary education. 
Proposals are being finalised for inclusion into the Early Years STEM Full Business
Case which is on track for submission to the Moray Growth Deal Programme Board
early in 2024. Approval of the Full Business Case will secure funding to commence
a capital development programme and official launch of the first STEM centre
location in August 2025. 
30
Page 220

Page 221

31
Key milestones 
As we head towards completion of the Full Business Case, 2024 will see significant
progress on a number of elements: 
Full Business Case submission
Staff recruitment and curriculum development
Official launch of STEM outreach offer
Design phase RIBA 3-4 incorporating exhibition and
interpretation
Construction contractor appointed
Vehicle and equipment purchase 
Construction and fit out works complete
Official launch of Elgin STEM Centre and mobile offer
Development of proposals and partner agreements
Creation of development plans, budgets and
architectural drawings. 
Public consultation
Site acquisition, legal processes and planning
permissions
Delivery phase of building works, infrastructure
development
Official launch of Outdoor Environmental Education
Centre
Official Launch of Forres STEM Centre
Official Launch of Buckie STEM Centre
Q1 24/25
Q1 24/25
Q2 24/25
Q2 24/25 
Q3 24/25
Q4 24/25
Q1 25/26
Q2 25/26
Q1 24/25
Q4 24/25 
Q4 24/25
Q2 25/26 
Up to 
Q1 28/29
Q2 26/27 
Q2 27/28
Q2 28/29
Phase 1
Phase 2
Page 221

Page 222

Risks and issues that require management by the project
team during 2024 
32
Effects 
Potential to
affect the scale
and ambition
of the project
that could
affect
outcomes and
benefits. 
Inability to
realise
outreach
activities. 
Improvements
in STEM
attainment
levels not
realised.
Mitigation 
Re-develop existing space to reduce
costs. 
Experienced architectural team to
provide budgets and sound project
management.
A phased approach to implementation
of facilities that will identify rising costs,
capture lessons learned and make early
interventions.
Close liaison between teams.
Adopt value engineering approach. 
Delivery model revised during 2023 to
fit the capital and revenue budget
available.  
Build in elements to the project that will
attract future funding opportunities to
support core staffing and continued
refreshment of the project.
Grow partnerships with other STEM
providers. 
Develop a delivery network of
volunteers and industry ambassadors
to ensure the longevity of the project. 
Consultations with education staff,
young people and the community
throughout the design process to
understand need.
Engagement with other STEM
providers, partnering and providing a
web of joined up inspiring and age
appropriate experiences
Identify barriers to participation and
seek to remove where possible. 
Flexible and dynamic approach to
curriculum development and project
delivery.
Implement CPD training to benefit all
schools through the Associated School
Group (ASG) network 
Risk 
Rising
construction
costs and scope
change. 
Insufficient
operation
planning and
budgets. 
No change in
community
attitudes or
regular repeat
visitations to
STEM centre
infrastructure.
Page 222

Page 223

33
Focus on….the project’s first hub in Elgin Library 
The first phase of the MGD Early Years STEM Project will see development of an
Early Years STEM Discovery Centre and Community Learning Hub, hosted within
Elgin Library at Cooper Park. The space will serve as a focal point for early years
STEM education, delivering interactive learning experiences to Early Learning and
Childcare settings, primary schools, and home educators across the region. 
The partnership with Elgin Library delivers  mutual learning objectives while
sharing resources, through co-location, provision of specialist equipment and
support from staff.   
2023 has seen significant progress planning for this facility.Moray Council’s
Architect led Design Team have developed proposals to RIBA stage 2 which sees
the former drill hall area transformed into an early years interactive learning
resource. An exhibition and interpretation design partner is being appointed in
January 2024 to fit out the space incorporating bespoke learning equipment and
educational programmes.  Stakeholder consultation is being planned for 2024
where users of the space will contribute to design plans and support the creation
of a state-of-the-art facility that will transform STEM learning in Moray.   
The BE hub will form part of a multi-building site shared with the MGD Housing
Mix project. The image above reflects the proposed back exterior to the BE hub
including the public realm space, shared with the Housing Mix project, and
developed by Moray Council. The back exterior of the hub, also depicting a glass
frontage, with the aim again to make engagement activity clearly visible and
encouraging. 
Early Years STEM Discovery Centre and
Community Learning Hubdesign concept Page 223

Page 224

34
Value
£7.5m capital 
Lead Body
The Moray Council
3.2.6 Housing Mix Delivery
Current status
The full business case was approved
during Q4 23/24 and the project has
entered delivery. 
Project vision 
Stimulating housing development in town
centres, unlock constrained sites and
promote the integration of pilot exemplar
sustainable design and construction
techniques.
Project summary 
The Housing Mix Delivery is a £7.5m project with a commitment of £5m from the
Scottish Government and £2.5m from Moray Council. The project supports the
delivery of up to 360 affordable houses and plots; 150 short-term construction
jobs annually; stimulates the private housebuilding sector to deliver up to 500
market houses; supports town centre regeneration of brownfield sites; and
provision of housing in rural towns and villages. 
Headline achievements 
Strategic progress: Full Business Case approved by Moray Growth Deal
Programme Board on 29 September 2023. 
South Street, Elgin: Legal agreements signed between partners, site acquisition
commenced in November 2023. Design completed to RIBA Stage 2, and RIBA
Stage 3 work started in November 2023. 
Dallas Dhu, Forres: Design team was appointed in March 2023. Proposal of
Application Notice (PAN) submitted on 16 June 2023 and revised PAN was
submitted on 21 November 2023 to include student accommodation. 
Hillside Farm, Dufftown: Design team appointed in June 2023. Community
Engagement Events held on 9 August 2023 and 6 December 2023. 
Speyview, Aberlour: Funding package agreed by the Scottish Government More
Homes Division to provide additional funding given the Growth Deal investment. 
Page 224

Page 225

35
Key milestones 
South Street, Elgin:  Submission for planning consentQ4 23/24
Dallas Dhu, Forres:  Submission for planning consent
Hillside Farm, Dufftown:  Draft Masterplan to be
approved by Council’s Planning and Regulatory
Services Committee
Q4 23/24
Q4 23/24
Speyview, Aberlour:  Funding Agreement to be signed
and Growth Deal investment of £700,000 to be spent
Hillside Farm, Dufftown:  Final Masterplan to be
approved by Council’s Planning and Regulatory
Services Committee
Q1 24/25
August 2024
Aerial view of South Street
development plans design concept
Page 225

Page 226

Risks and issues that require management by the project
team during 2024 
36
Effects 
The project is able to invest
in fewer sites throughout
Moray as the budget was
fixed in 2021 and will not
be adjusted for inflation. 
Whilst this is a risk the
project is managing, it is
still projected that the
expected benefits will be
realised.   
Project scope may need to
be changed or the delivery
timescales elongated. 
Potential for other activity
to impact the ability for
HMD to create the right
environment for success
with stakeholders and
realise all of the benefits
sought.
Mitigation 
A cost consultant has been
engaged to control the
investment costs for each
site. 
Funding from additional
sources will be sought. 
The Council is actively
exploring external funding
options, such as UK Shared
Prosperity Fund, Just
Transition and UK
Government Long Term Plan
for Towns. 
Good working relationships
have been established
between Growth Deal
Project Managers.  This is
evidenced through
constructive collaboration
with the Business Enterprise
Hub on South Street
redevelopment. 
Risk 
Inflation and
construction costs
continue to rise. 
Inability to attract
external sources
of funding to
support the
delivery of the
project. 
Activity being
progressed by
other Growth Deal
projects or
economic
development
activity in Moray
has a negative
impact on HMD.
Page 226

Page 227

37
Focus on….South Street (Elgin) regeneration project 
This is a partnership project between Moray Council, Moray College UHI and
Robertson Property Ltd; and forms part of two Moray Growth Deal projects:
Housing Mix Delivery and Business Enterprise Hub. The overall site comprises five
separate ownerships: 
M&Co, 51 South Street (long vacant)
Elgin Furniture & Carpet Store, 53-55 South Street (operating business)
Junners, 57-61 South Street (long vacant)
Jailhouse, 130 High Street (derelict)
Newmarket Bar, 130 High Street (derelict) 
This regeneration project will deliver the Business Enterprise Hub, 38 one and two
bed flats and opportunities for 2-3 small retail units. 
During 2023 design was progressed to RIBA stage 2 and in November 2023 entered
into RIBA Stage 3. Legal agreements were signed by all parties and development
agreements have been drafted late 2023. Site assembly started in late 2023 and
public engagement event was held on 16 December 2023. A detailed planning
application is anticipated to be submitted to the Council during Q4 23/24. 
South Street development plans
design concept
Page 227

Page 228

Project summary
This project aims to deliver a once-in-a-generation combination of the Moray
Growth Deal, strategic aerospace developments and a partnership with Boeing to
provide a genuinely transformational opportunity for the region and its people. 
Funding for the facility will be provided by the UK Government (£21m) and
Highlands and Islands Enterprise (£3m).   
Having received an updated and detailed proposal from Boeing in summer 2023,
regarding how they will support the MAATIC facility, the project team is working to
develop a Full Business Case that focuses on five streams of activity: 
1) Boeing /Civil Aviation Authority (CAA) / Air Services Training (AST - Existing skills
and training vehicle of UHI Perth)  condensed part 66 and type approved
training (aerospace and aviation)
2) Immersive training centre for safety critical systems (immersive technologies
and synthetic training)
3) Delivery of a suite of integrated programmes of education covering aerospace,
aviation, immersive technologies, advanced manufacturing and innovation
4) Centre for research in aerospace and sustainable fuels (aviation, aerospace and
innovation)
5) Innovation and development space 
The MAATIC building itself will house commercial and academic leading-edge
research on these emerging technologies, will be a training facility to support the
skills required to underpin and deliver these technologies. It will have a communal
space for the promotion of STEM developments and opportunities to the
community and to the next generation of technologists. 
Whilst the Business Enterprise Hub, MICM and MAATIC FBCs aim to solve different
challenges regarding business growth and skills, there are significant synergies and
work has taken place to ensure clarity on the scope of each, areas for potential
overlap and how these can be successfully managed.   
38
Value
£24.4m capital 
Lead Body
UHI (University of
Highlands and
Islands)
3.2.7   Moray Aerospace, Advanced Technology                
and Innovation Campus (MAATIC)
Current status
Project under review in light of funding
challenges.   
Project vision 
A cutting edge commercial and
academically supported training and
research centre for excellence that will
provide advanced skills for the region’s
industries.
Page 228

Page 229

39
Headline achievements 
During 2023 the project developed a revised vision for the project that saw a move
to focusing on leading edge digital skills for the aerospace industry that is
supported by Boeing, the application of digital learning to other safety critical
environments and R&D opportunities.  With no need for the facility to be located
near to a runway, other sites in Moray have been appraised. 
A key project USP is a progressive, mutually beneficial relationship with Boeing.
Following work to refine the vision for the facility and how Boeing could support
this, both parties advanced the development of a formal partnership agreement. 
From a resourcing perspective, the pace of progress during 2023 has been affected
by staff changes and availability.  Steps were taken at the end of 2023 to mitigate
this in the future with responsibility for the project moving from UHI-Moray to UHI-
Executive Office. 
Key milestones 
UHI to conclude internal review of the project FBC
Subject to the above,the following steps will be taken
to advance the project:   
UHI and Boeing to sign a partnership agreement 
Resubmission of MAATIC FBC to the MGD Board,
with a view to commencing the process to secure
Government and Moray Council approval 
Government clearance and Council approval to be
secured, enabling the project to enter delivery 
MAATIC project to enter delivery
Q4 23/24
Q4 23/24 
Q4 23/24 
Q2 24/25 
Q2 24/25
Page 229

Page 230

Risks and issues that require management by the project
team during 2024 
Focus on….creating a digital learning environment for
aerospace skills 
Throughout 2023 the project worked closely to redefine the vision for the facility in
light of the industry moving towards hybrid (virtual and physical) training for
aerospace skills. UHI sought to ensure that a multi-dimensional operating and
financial model was in place that would mean the continued viability of the
campus. 
Central to the new vision is the use of augmented, immersive teaching
environments for condensed part 66 training. The project will work with Boeing
and the Civil Aviation Authority in light of changing regulations to integrate virtual
ways of working into teaching.   
In creating these teaching environments, the project will look to the academic and
R&D opportunities within the facility to include both digital skills and apply the
learning environments to other safety critical environments.  
40
Effects 
Potential for delay
and rework. 
Alters the financial
model and
potentially the
viability of the
project as a whole. 
Affects the
delivery
timescales for the
project. 
Threatens
planned
redevelopment of
site and FBC
plans.
Mitigation 
Close collaboration with key
stakeholders. 
Robust planning during the
implementation phase and regular
reviews of data so the project and
Business As Usual teams can take
action as needed to realise targets
set. 
Close collaboration with key
stakeholders. 
Should the revised costs push
beyond the budget explore
refinements to reduce costs that
mean project objectives can still be
achieved. 
Risk 
Issue: The FBC in 
it’s current form
cannot be
progressed. 
Risk: Gaps
between actual
and projected
targets around
student numbers,
research and
innovation. 
Risk: Delay in site
acquisition. 
Risk:  Increase in
capital costs
render original
plan unaffordable.
Page 230

Page 231

41
Project summary 
The key driver for this project is to achieve a grassroots cultural shift in how Moray
businesses gain insight into the latest process and production efficiencies that are
available, and how they can use them for product and process innovation.   
The Manufacturing Innovation Centre for Moray (MICM) will act as a local focal
point for business to access best practice and identify how they can collaborate
with universities and other research institutes. They’ll be quickly supported to
access the relevant support from organisations such as Highlands and Islands
Enterprise (HIE), National Manufacturing Institute Scotland (NMIS), Scottish
Manufacturing Advisory Service (SMAS), Interface (the knowledge connection for
business), Business Gateway and other service providers to meet their needs. 
The project will receive both capital (£610k from the Scottish Government, £2.4m
from the UK Government and £2.5m from Highland and Islands Enterprise) and
revenue funding (£1.25m from Highlands and Islands Enterprise). 
MICM will provide services that are customised to the needs of rural
manufacturing business, it will also act as a vital access point for local businesses
to engage with the National Manufacturing Institute for Scotland and other
national innovation support services. 
The development of the FBC during 2023 has supported our view that, while much
has changed since the Moray Growth Deal was developed, the core need to
support a vital sector to improve and innovate has not and MICM’ s mission is
more relevant than it was in 2019. 
Value £7m
(£5.6m capital,
£1.36m revenue) 
Lead Body
Highlands and
Islands Enterprise
3.2.8   Manufacturing and Innovation Centre               
for Moray (MICM)
Current status
The full business case was approved
during Q4 23/24 and the project has
entered delivery. 
Project vision 
A focal point for businesses to learn best
practice and collaborate, stimulating the
creation of new and growth of existing
micro businesses throughout Moray.
Page 231

Page 232

42
Headline achievements 
Our focus during 2023 has been to develop the Full Business Case and to gain
approval for the project to progress. 
Key achievements include: 
Development and approval of change request covering the project’s location, no
longer co-locating with the MAATIC project, but refurbishing existing buildings
with some new build construction on the Forres Enterprise Park.
Whilst the MICM, MAATIC and Business Enterprise Hub projects all tackle
different audiences regarding skills and business development, work developed
the potential for overlap and synergies with each. 
Development of the project’s Full Business Case that was approved by the MGD
Board in September 2023.  
Engagement with the Government to enhance the FBC following comments
from Policy Advisors.  
Approval of the FBC by HIE Board. 
Key milestones 
Complete design
Planning approval
Feb 2024
March 2024
Commence construction
Key staff recruited
May 2024
Autumn 2024
Complete construction
Operational stand-up
Autumn 2024
Autumn 2024
Page 232

Page 233

43
Risks and issues that require management by the project
team during 2024 
Effects 
Compromises
what MICM can
deliver. 
Vision for MICM
diverges from
what the business
community would
like to see. 
Revenue shortfall
Mitigation 
Monitor. Contingency is built into
cost model. Construction starts
in2024. 
Consultation events with the Moray
Growth Deal, Business Assembly and
Chamber of Commerce, as well as a
broader business survey. Ensure
involvement with Project Board. 
Sensitivity analysis in FBC.
Develop alternative revenue
sources.
Risk 
Cost inflation
affects project
affordability. 
Lack of productive
engagement with
the business
community. 
Revenue
assumptions are
overoptimistic.
Page 233

Page 234

Focus on….how the project will support businesses to grow
and innovate 
The ambition for MICM is to create a grassroots cultural shift in efficiency and
innovation for Moray’s manufacturing businesses. HIE work with manufacturing
businesses across our region to support their development and we see a clear and
growing need for local support to access the best practice required to make the
leap to the next level. 
Some recent examples include: 
A manufacturer developing lighter components using composites is looking for
support in development of validation and testing of components from NMIS and
the national Lightweight Manufacturing Centre. This will require at least two
week’s travel to the central belt for key personnel who are currently in the
middle of a demanding scale-up project.  The company is currently weighing the
benefits of continuing with the project. With MICM in place they could access a
local venue for both equipment and project support reducing costs and
disruption and bringing the test equipment closer to their processes.   
A Caithness based engineering company has been affected by a shortage of
skilled labour. Having analysed their manufacturing processes, they believe that
automation of their production line might help. With support from HIE, the
company attended a demonstration event held in Thurso by the North
Lanarkshire SmartHub to explore the use of cobots (collaborative robots) to
improve their welding processes. During the event the company met with an
equipment vendor and have gone on to develop a project to install and evaluate
a small cobot at their Caithness site.  The potential prize for the company is an
expansion of working hours, reduced order fulfilment times and securing
further orders. This is a great example of the type of project that we want MICM
to work for Moray businesses – using a centralised hub to provide links and
opportunities for SMEs to access best practice in manufacturing and supporting
them to evaluate how it could benefit their business. 
44
Cobot
Page 234

Page 235

45
4 Forward look at activity planned for 2024 
4.1 Work to get all Growth Deal projects into delivery
The Moray Growth Deal entered 2023 with one project in delivery, Digital Health.
This was quickly joined by Bus Revolution that received clearance to enter delivery
in March 2023. 
Building on this, in the second half of 2023, three project FBCs were developed and
submitted for  formal review by the Scottish and UK Governments: 
Business Enterprise Hub
Housing Mix Delivery 
MICM 
These documents have been the subject of extensive consultation and received
approval from a number of different governance steps.   
By the end of Q4 23/24, four of the eight Growth Deal projects are in delivery
(Housing Mix Delivery and MICM joining Digital Health and Bus Revolution), with
the Business Enterprise Hub due to be the fifth once the philanthropic revenue is
confirmed. Of the three remaining projects: 
The Cultural Quarter and EY STEM projects are expected to submit their FBCs to
the MGD Board during Q4 23/24 and Q1 24/25.
An FBC has been drafted for MAATIC that is currently being reviewed.   
Project 
BE Hub 
Housing
Mix
Delivery 
MICM
Pre-
submission
workshop
with the
Governments 
21 Jun 2023 
3 Aug 2023 
3 Aug 2023
Project
Board
approval 
27 Jul 2023 
20 Sep 2023 
8 Sep 2023
First approval
to trigger
Government
review 
11 Aug 23 
29 Sep 23 
25 Aug 23
Second
review
following
Government
feedback 
12 Dec 23 
12 Dec 23 
12 Dec 23
Other
approvals 
26 Jul 23:
Moray
College
Board 
31 Oct 23:
HIE Board
Moray
Economic
Partnership 
14 Dec 23 
14 Dec 23 
14 Dec 23
Page 235

Page 236

4.2 PMO Milestones to be achieved
During the course of 2024, the Moray Growth Deal PMO is working to achieve a
number of key milestones: 
46
Work to understand planning implications
(resources, risks, opportunities) associated between
the Growth Deal, Levelling Up Fund and the Long
Term Plan for Towns fund. 
Deal annual conversation involving senior officers
from Moray Council and the Scottish and UK
Governments. 
Business Enterprise to enter delivery once revenue
budget confirmed. 
2024/25 grant offer letter to be agreed with the
Scottish Government, confirming the level of
funding to be provided during the financial year.   
Publication of the Deal’s 2023 annual report. 
Cultural Quarter and EY STEM project full business
cases to be approved and clearance secured to
enter delivery. 
Second tranche of in-life reviews to be scheduled.Q2s and 3
24/25
Q4 23/24
Q4 23/24
Q4 23/24 or 
Q1 24/25
Q1 24/25
Q1 24/25
Q2 24/25
Page 236

Page 237

47
4.3 Factors needing action or future activity could be impacted 
There are a number of ‘uncertainties’ that could have a positive or negative impact
on Growth Deal activity that are being managed at both a programme and project
level.  Key uncertainties include: 
Consideration needs to be given to how Growth Deal activity interacts with
projects funded through Levelling Up and the Long Term Plan for Towns Fund to
ensure that they complement each other, that there is no overlap and that there
are no inadvertent risks created as the work is commissioned.  
With the potential for construction projects associated with the Business
Enterprise Hub, Cultural Quarter and Housing Mix Delivery occurring at the
same time in Elgin, planning will need to take place with key stakeholders to
ensure any potential disruption for the public and businesses is minimised.
Cost inflation and the affordability of projects remains a potential risk. During
2023 significant work was undertaken by Project Managers to rework aspects of
construction plans an operational models to ensure they meet capital and
revenue projections. Looking into 2024, the greatest budgetary challenges will
be faced by Cultural Quarter’s two significant building refurbishments; MAATIC
design activity for their campus; and the continued affordability of work by
Housing Mix Delivery to increase affordable and private house building rates in
Moray.  
At a time when Moray Council and other public organisations are facing
significant budgetary challenges, it’s important to manage when and how
communications related to Growth deal activity are released. This  ensures
messages about changes to the Council or partner budgets are separate from
news about Growth Deal investment.   
4.4 Monitoring the benefits to be realised by the Deal
Significant progress has been made to ensure a firm baseline is in place on what
benefits and their associated targets will be delivered at both a programme and
project level, with a completed Benefits Realisation and Monitoring Plan due to
finalised in Q1 24/25. This is a quarter behind original projections, primarily due to
procurement delays experienced. Key activity that needs to be completed includes: 
A procurement call for consultancy support to gather evidence for programme
level indicators took place during Q3 23/24, however, this was unsuccessful
which has delayed the plan. During Q4 23/24 into Q1 24/25 the PMO will work
to secure consultancy support to complete this work.
Work has taken place with projects on the monitoring plans needed as full
business cases are developed. 
During Q1 24/25, the PMO will submit a paper to the MGD Programme Board
that draws together all of the information above into a Benefits Realisation and
Monitoring Plan. This will be include a stock check to make sure the Deal is on
track to deliver the outcomes set out when at Full Deal signing in December
2021.   
Page 237

Page 238

5. Financial summary 
5.1 Funding sources for Deal activity
During 2023 the funding landscape for the Moray Growth Deal remained static,
with no changes to the funding agreement in place between the Moray Council
and the Scottish and UK Government.   
The same capital and revenue profile as reported in the 21/22 annual report
remains valid, however, there is the potential for a reduction in the capital cost
associated with the MICM project. The profile contained within the financial model
of the approved business case, sees capital costs reduce from £6.87m to £5.6m.
During 2024 consideration will be given to how this underspend can be reallocated
to other Growth Deal activity. 
As highlighted in section 4, there is potential that projects such as Cultural Quarter
may have difficulties funding the current aspiration and scope within the existing
funding , however, work will take place to adjust construction plans and seek other
sources of funding. 
48
Grant Lodge survey
Page 238

Page 239

49
Project 
Capital
Bus Revolution
BE Hub
Cultural Quarter
Digital Health
Early Years STEM 
Housing Mix Delivery
MAATIC*
MICM 
TOTAL 
Revenue
Bus Revolution
BE Hub
Cultural Quarter
Early Years STEM 
MAATIC*
MICM
TOTAL
Scottish
Government
investment
(£’000) 
4,000
3,300
12,700
-
3,500
5,000
-
750 (610 in
project FBC)
29,250
(reducing to
29,110 due to
MICM FBC) 
-
2,000 
-
-
1,250
3,250
UK
Government
investment
(£’000) 
-
-
3,500
5,000
-
-
21,000
3,000 (2,442 in
project FBC)
32,500 
(reducing to
31,942 due to
MICM FBC) 
-
-
-
-
-
-
Local partner
investment
(£’000) 
1,000
15,400
-
1,300
2,500
3,390
3,140 (2,557 in
project FBC)
26,730
(reducing to
26,147 due to
MICM FBC) 
332 
700
1,575
-
110
2,707
Total
investment
(£’000) 
4,000
4,300
31,600
5,000
4,800
7,500
24,390
6,890 (5,609 in
project FBC)
88,480
(reducing to
87,199 due to
MICM FBC) 
332
2,000
700
1,575
-
1,360
5,957
* Level of funding expected to be higher due to private benefit in kind
contribution and HIE revenue support
Page 239

Page 240

50
5.2 Funding drawn down from Scottish and UK Governments  - Q4 22/23 to
Q3 23/24
In line with the conditions associated with Scottish and UK Government funding,
projects can only draw down funding once their full business cases have been
approved by the MGD Board, both Governments and the Moray Council. During
2023, two projects had reached this stage: 
Project 
Bus Revolution 
Digital Health 
TOTAL
Government
investment
(£’000) 
4,000 
5,000 
9,000 
Previous draw
down up to Q2
22/23 inclusive) 
0
1.505 
1,505 
Period covered
by this annual
report (Q4 22/23
to Q3 23/24) 
738 
1,293 
2,031
Draw down (all figures £’000)
Total draw
down to date   
738 
2,798 
3,536 
Page 240

Page 241

51
6. 2023 communications activity 
May 2023 saw the publication of the 2021/22 Moray Growth Deal Annual Report,
alongside a round up of the status of each project. As more projects progressed
through their planning and business case stages, activity increased during 2023.
This included media releases, social media posts and stories with live streaming
from events alongside in-person engagement activity and events, specifically: 
Bus Revolution project, m.connect on demand public transport services
The comms and marketing campaign for m.connect started with a driver
recruitment campaign in February 2023 and the commencement of services in
May. This progressed to full phase one service delivery marketing and official
Ministerial launch by August 2023. 
The launch involved the unveiling of the first name of one of the electric buses,
which was open to all residents in Moray to suggest as part of the engagement
campaign, which attracted over 200 entries. Promotion of the services and new
developments to the offering, including group bookings, continued throughout the
year. 
Business Enterprise (BE) Hub
The details of the Business Enterprise Hub were further highlighted in November
2023 as part of the wider promotion of regeneration activity planned for South
Street in Elgin.  Building on this, a drop-in exhibition was held in December 2023 to
explain the vision to local residents attracting over 600 visitors. Planning
applications and full business case approval will enable further communications
and engagement opportunities to take place in early 2024. 
Cultural Quarter
The Cultural Quarter has picked up momentum this year as details were released
on the plans for Grant Lodge and investigative works, with updates given online
and in person at local events such as Doors Open Day tours in September 2023. A
further significant milestone was marked when LDN were appointed as the design
team for Elgin Town Hall in November 2023.   
Digital Health 
Digital Health Innovation launched its Demonstration and Simulation Environment
(DSE) Space in April 2023, which propelled the communications and engagement
activity into the delivery phase. After the initial launch comms, further in-person
engagement was undertaken to encourage residents to join the citizens panel and
to highlight work being delivered by the project.   
EY STEM
Early Years STEM engagement took place at a number of Local Development Plan
events held across Moray during 2023, which included introducing the project to
local residents. 
Page 241

Page 242

Dufftown Housing Mix Consultation
Housing Mix Delivery
Updates were provided on the appointment of the design team for the Dallas Dhu
phase of the Housing Mix Delivery in April 2023, following community engagement.
The progress of activity in Dufftown was shared at drop-in exhibitions and the
South Street development was shared as part of drop in session promoting the
wider regeneration of this part of Elgin in December 2023. 
MAATIC
Due to the nature of negotiations with partners involved and changes being made
to the project vision, limited public engagement took place during 2023. Further
information will be communicated during 2024, once there is clarity on the vision
for this skills intervention project.  
MICM
Communications activity has been limited as the project worked to develop their
full business case and move away from co-locating with MAATIC to a stand along
facility on the Forres Enterprise Park.  The project entered delivery in early 2024
and communications are planned as the service hub offering is established in time
for it’s opening by autumn 2024.   
52
Page 242

Page 243

7. Programme structure and governance
structure 
7.1 Structure of Moray Growth Deal activity and Officers involved
Following the recruitment of programme and project teams during in the first half
of 2022, there has been continuity and stability in the majority of roles during
2023. This has helped maintain the pace of activity and is a contributing factor to 
the progress that has been made. 
The roles that have changed during 2023 include: 
Lynne Owen has joined the Programme Management Office as a Programme
Officer 
Allane Hay stepped down as Project Manager of the Business Enterprise Hub
following completion of the full business case. Samantha Scott, who had been
working with Allane, has now taken up this role. 
The lead body for MAATIC is now the UHI-Executive Office, with a new SRO (Max
Brown, Director of Transformation) and PM (Steven Gregg). 
Executive oversight of the Moray Growth Deal 
Rhona Gunn, Depute Chief Executive and Moray Growth Deal Senior
Responsible Officer (SRO) (Moray Council) 
Jim Grant, Head of Development Services (Moray Council) – day to day oversight 
Programme Management Office 
Michael Kelly, Programme Manager (Moray Council) 
Lynne Owen, Programme Officer (Moray Council) 
53
Page 243

Page 244

Project Delivery 
Teams in place within different organisations working to deliver the eight projects
that make up the Moray Growth Deal. 
54
Bus Revolution 
(led by Moray Council) 
PM: Stevie Robertson, Senior
Project Manager
SRO: Nicola Moss, Head of
Environmental and
Commercial Services 
Business Enterprise Hub 
(led by UHI-Moray) 
PM: Samantha Scott, BE Hub
Project Manager and Deputy
Head of Academic
Partnerships at UHI-Moray
SRO: David Patterson, 
UHI-Moray Principal 
Cultural Quarter 
(led by Moray Council) 
PM: Claire English, 
Senior Project Manager
SRO: Jim Grant, Head of Growth and
Development 
Digital Health (led by the Digital
Health Institute) 
PM: Marie Simpson, 
Programme Manager
SRO: Janette Hughes, Director of
Planning and Performance 
Early Years STEM 
(led by Moray Council) 
PM: Sarah Barnes, 
Senior Project Manager
SRO: Hazel Sly, 
Early Years Service Manager 
Housing Mix Delivery 
(led by Moray Council) 
PM: Hilda Puskas, 
Senior Project Manager
SRO: Gary Templeton, 
Strategic Planning and
Development Manager 
MAATIC 
(led by UHI-Executive Office) 
PM: Steven Gregg, 
Project Manager at UHI
Executive Office
SRO: Max Brown, 
Director of Transformation at
UHI Executive Office 
MICM (led by HIE) 
PM: David Howie, Head of
Strategic Projects
SRO: David Reid, Area Manager
(Moray) 
Page 244

Page 245

55
Project 
DHI 
MICM 
DHI 
BE Hub 
EY STEM
Assurance
gate
E:  Change 
E:  Change 
E:  Change 
E:  Change 
E:  Change
Description 
A new financial profile for the
project was presented in light of a
financial underspend in financial
year 2022/23. 
Due to a lack of certainty on the
preferred site for MAATIC and
both parties planning to co-locate,
request for MICM FBC submission
date to be delayed until May 2023. 
Updated change request
submitted following advancement
of Q4 spend and the project being
able to determine a more accurate
profile for 2022/23 spend. 
Request to change the FBC
submission date to the MGD
Board to June 2023. 
Revised preferred delivery model
presented that is affordable within
existing capital and revenue
budget allocations.
Date 
Jan 2023 
Feb
2023 
Mar
2023 
Mar
2023 
Apr
2023
Status 
Decision
delayed, more
information
required 
Approved 
Approved 
Approved 
Approved
7.2 Summary of assurance activity progressed during 2023
The Deal has a series of assurance ‘gates’ in place that, when triggered, require
submissions to be made to the MGD Board for approval to progress. 
Gates A-E are project led requests, whereas Gate F is a schedule of in-life reviews
initiated by the PMO that allows the MGD Board to take a more in-depth look at
projects that are in delivery.  During 2023 the MGD Board considered the following
assurance activity:
Gate
A B C D E F
Approval 
of Strategic
Outline 
Case (SOC)
Approval 
of Outline
Business
Case (OBC)
Approval 
of Full
Business
Case (FBC)
Closure 
of a 
project
Change
request to
previously
agreed
baseline
In-life 
review
Page 245

Page 246

56
Project 
HMD 
MICM 
Bus
Revolution 
MAATIC 
BE Hub 
MICM 
EY STEM 
Assurance
gate
E:  Change 
E:  Change 
E:  Change 
C:  FBC
approval 
C:  FBC
approval 
C:  FBC
approval 
E:  Change 
Description 
To enable evidence form the
Housing Demand and Need
Assessment, proposal to adjust
the FBC submission date to
September 2023. 
Request to decouple the project
from MAATIC regarding site
location, with a view to
progressing a preferred location
of Forres Enterprise Park.  Project
also requested an additional 3
months to finalise the FBC. 
Proposal to make a small
amendment to the financial
model, moving £19,3500 that was
underspent in financial year
2022/23 into 2023/24. 
Full Business Case (FBC) 
submitted for approval. 
Full Business Case (FBC)
submitted for approval. 
Full Business Case (FBC)
submitted for approval. 
Request to change the FBC
submission date from October
2023 to January 2024 to align with
the delivery of outputs from
professional advisors. 
Date 
Apr
2023 
May
2023 
Jun 2023 
Aug
2023 
Aug
2023 
Aug
2023 
Aug
2023 
Status 
Approved 
Approved 
Approved 
Decision
delayed,
revised version
required
following
Board
comments. 
Approved 
Approved 
Approved
Page 246

Page 247

57
Project 
CQ 
MAATIC 
HMD 
DHI 
Bus
Revolution 
DHI
Assurance
gate
E:  Change 
C:  FBC
approval 
C:  FBC
approval 
F:  In-life
review 
F:  In-life
review 
E:  Change 
Description 
Following dialogue with the
Governments, proposal presented
to take a phased approach to the
FBC due to the different
construction horizons for Elgin
Town Hall and Grant Lodge.  FBC
submission date changed to
March 2024. 
Full Business Case (FBC) 
submitted for approval. 
Full Business Case (FBC)
submitted for approval. 
In depth review of the project,
with a focus on the status of the
different living labs. 
In depth review of the status of
the project, with a focus on data
from the first six months of
m.connect services. 
In light of the Rural Centre for
Excellence securing a longer term
funding package from the Scottish
Government, request to change
the delivery window of the project
by one year (to 2026) to realise
opportunities associated with the
creation of a more integrated
digital solutions. 
Date 
Sept
2023 
Sept
2023 
Sept
2023 
Oct
2023 
Nov
2023 
Dec
2023 
Status 
Approved 
Approved, but
with revisions
to be made to
the document 
Approved 
Approved 
Approved 
Approved
Page 247

Page 248

7.3 Audit activity undertaken during 2023
Building on the scrutiny provided by the MGD Board and establishment of an in-life
review process for projects that are in delivery, it’s expected that activity will be the
subject of periodic audits. 
During the term of this report, the following internal audit activity has been
progressed: 
Closure of the 2022 Moray Council Internal Audit: Following a 2022 internal
audit by  Moray Council that rated the project’s control of the audit scope as
substantial, the Deal was asked to implement five recommendations.
Subsequently, a report1 was presented to the Council’s Audit and Scrutiny
Committee on 22 November 2023 informing members that all of the
recommendations have been successfully closed.   
Digital Health Internal Audit: Scheduled to mark the second anniversary of the
project being in delivery, the University of Strathclyde Internal Audit Service
undertook an audit of the Digital Health project. The scope focused on internal
project controls. 
58
1 Closure report on the 2022 MGD Internal Audit that is available on the Council’s
website
Page 248

Page 249

59
Page 249

Page 250

60
April 2024
Page 250