Moray Council 
Wednesday, 24 April 2024 
NOTICE IS HEREBY GIVEN that a Special Meeting of the Moray Council is to be
held at Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Wednesday, 24 April 2024 at 09:30. 
BUSINESS 
1 Sederunt 
2 Declaration of Group Decisions and Members Interests * 
3 Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Item 5-7 of business
on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4 Transformation Strategy
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
5 - 28 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
5 Short to Medium Term Financial Planning
• 1. Information relating to staffing matters; 
Page 1

Page 2

6 Voluntary Early Retirement Application
• 1. Information relating to staffing matters; 
7 Buckie Dredging Update
• 6. Information relating to the financial or business affairs of any
particular person(s);
• 8. Information on the amount of any expenditure proposed to be
incurred by the Authority; 
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Page 2

Page 3

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
Page 3

Page 4

MORAY COUNCIL 
Moray Council 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Donald Gatt  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Peter Bloomfield  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Neil McLennan  (Member)
Councillor Shona Morrison  (Member)
Councillor Bridget Mustard  (Member)
Councillor Derek Ross  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk van der Horn  (Member)
Councillor Sonya Warren  (Member)
Councillor Ben Williams  (Member)  
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 4

Page 5

REPORT TO: MORAY COUNCIL ON 24 APRIL 2024 
SUBJECT: TRANSFORMATION STRATEGY 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To ask the Council to approve a first iteration of work towards a new Council
Transformation Strategy. 
1.2 This report is submitted to the Council in terms of Section III (A) 2 of the
Council's Scheme of Administration relating to considering Capital and
Revenue Budgets and long-term financial plans. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Council approves the first iteration of work
towards a new developing Council Transformation Strategy (Appendix 1)
to ensure a continued focus on delivering transformation projects to
support the Council’s financial sustainability and provide a sound
foundation for essential future transformation work and agrees further
development work as set out in the report. 
3. BACKGROUND 
3.1 As the first step in the Council savings hierarchy, transformation offers a
positive alternative for future service delivery, meeting needs at lower costs in
order to close the council budget gap and protect services from cuts as far as
possible. Within the Corporate Plan, the Council recognises transformation
and innovation as a key council priority that is reflected in our values of being
Ambitious: ensuring sustainable and efficient services; and Improving: drive
improvement, encourage innovation and invest in transforming to meeting
future needs.  
Item 4
Page 5

Page 6

3.2 This report provides a first iteration of a new, developing Council
Transformation Strategy (Appendix 1) to take forward a continued focus on
delivering transformation projects already in progress, accelerate and expand
where there is opportunity and develop new areas of work to support the
council’s financial sustainability, providing a sound foundation for future
transformation work. 
3.3 The Council established an Improvement and Modernisation Programme
(IMP) to deliver transformational change across the authority at the Council
meeting on 12 December 2018, with subsequent reports to the Council and
Corporate Committee to adjust the programme.  The most recent progress
update was considered by the Corporate Committee on 23 April 2024. 
3.4 The IMP followed on from two previous transformation programmes:
Designing Better Services and the Digital Services programme. Designing
better services (DBS) which concluded in 2015 having delivered £2.4m of
recurring annual savings from the Core project plus savings from vehicles and
buildings projects.  Projects included: flexible working; electronic document
management; mobile work solutions (homecare scheduling, housing DLO);
vehicle rationalisation (pool cars); property consolidation and new HQ;
procurement; customer contact centre; and employee administration portal. 
3.5  In April 2015, the Digital services programme was established which delivered
new Council website; secure online account (myAccount); over 80 online
services, including Council housing services; data matching across housing
and customer services; enhanced deployment of parents portal (online
schools registration); and leisure online bookings.  The project closed in
March 2019 and resulted in channel shift: 25,000 online requests on eforms;
100% sports development courses booked online; over 80% school meal
payments online; 70% garden waste permits; 17.5% reduction in face to face;
40 open data sets published.  The project provided the basis for cashable
savings of around £350,000 and a platform for the future delivery of further
online services. 
3.6  When initiated in 2018, the Improvement and Modernisation Programme
(IMP) was intended to invest in initiatives which would provide a long-term
financial saving for the Council and so support future sustainability of services. 
It was informed by diagnostic work carried out by public sector consultancy 
i-ESE to identify opportunities for efficiency and included a peer review by the
Improvement Service.  In May 2021, the Council agreed to expand the IMP to
include investment projects for service improvement and this included
provision for significant investment in Education as a Council priority at that
time. 
Page 6

Page 7

3.7  Transformation is one of the elements in the hierarchy of measures to ensure
the council is financially sustainable moving forward.  Therefore, as the
Council’s financial position became more challenging, more recent reviews of
the projects in the IMP have returned the focus to financial sustainability and
projects that can provide cashable savings in support of closing the Council’s
budget gap. A number of projects have concluded over the period of the IMP
and taking account of project closures and the focus on savings, the report to
the Corporate Committee on 23 April 2024 (item 6) included a consolidation of
the remaining projects enabling a transition from IMP to the new
Transformation Strategy . 
3.8  Having been engaged in transformation work, including support and advice
from external sources, for over 15 years the Council has a strong base from
which to learn and develop further transformation.  An example of this is
where the early implementation of flexible working during Designing Better
Services (DBS) and the experience of the Covid-19 Pandemic have provided
learning to support the development of the Smarter Working project which has
been successful in providing further savings from rationalisation of use of
buildings.  Likewise, the development of the customer contact centre and
digital services have provided a foundation for the improved customer access
offered by Information Hubs in libraries and the associated financial savings. 
3.9 The Council continues to face significant financial challenges in the short term
with a requirement to address a budget shortfall by 2026/27 of £14 million at
the time the budget for 2024/25 was set.  Therefore, there is a need to reset
the Council’s transformation work and develop a new Transformation Strategy
to accelerate and increase the scale of savings. 
New Transformation Strategy 
3.10  The Corporate and Senior Management team (CMT/SMT) have led work
across services and with the Council Leadership Forum (Third Tier Service
Managers) to identify further opportunities for transformation.  In order to
continue to deliver the planned transformation projects and provide a sound
basis from which to develop the future council transformation. 
3.11 This has included review of guiding design principles to give direction for the
developing programme of work and recognises the range of means to achieve
transformation from new approaches, service redesign and redefinition to
income generation.  As the new Transformation Strategy is developed, clear
core purpose, aims, vision and guiding principles will be required to inform
and shape the future transformation strategy and to ensure continued
consistent focus over the duration of the work.  It is proposed to develop these
with Elected Members initially and to undertake engagement with the
workforce and wider stakeholders.  
Page 7

Page 8

3.12 Appendix 1 provides the first iteration of a new Transformation Strategy,
which recognises the national and local priorities and the importance that the
Council places on transformation to support its financial sustainability.  It takes
account of experience to date and sets out design principles (Appendix 2) to
guide the development of future council transformation work.  The proposed
Strategy is made up of a set of projects to continue the council’s
transformation journey categorised as follows: 
i) New opportunities for discovery work have been identified from
horizon scanning (N); 
ii) Innovation areas for research and discovery to assess future
potential (I);
iii) Additional projects for initiation have been added to the IMP (A); 
iv) Expansion or acceleration projects have been identified from
current transformation work (E); and
v) Current projects that provide financial savings (C). 
3.13 In preparing projects to include in this more focussed strategic Transformation
Strategy, some work has been tasked to Heads of Service to advance as
service projects where they are of a lower value so that the strategic focus on
pace and assuring delivery can be on the projects that deliver the greatest
value across the council.   
3.14 Current versions of project mandates that give a high-level description of the
project concept are held in the Members Documents section of CMIS and
shown in green type in the List of Transformation Projects in Appendix 1.
These comprise newly added projects and those where acceleration or
reframing is proposed. For some projects, the project mandate is not yet
available because it is still in development. All mandates not previously
approved will be reported to committee as further iterations of the Strategy are
developed and greater clarity emerges on the scale and duration of
investment package needed to deliver the projects. Information on these
projects is currently provided to set out progress to date and provide a
platform for the further engagement with members and wider stakeholders set
out in paragraph 3.11. No approvals are sought at this stage for the indicative
figures for investment contained in Appendix 1. These will be refined as the
next iteration of the Strategy is developed and brought back in the next update
report to Committee. 
Page 8

Page 9

3.15 The initial work by the Senior Management Team concluded that a major
change in thinking and approach is required to stimulate the scale, depth and
pace of change required to bridge the Council’s financial gap.  It is also
important to maintain progress and pace of current transformation projects,
accelerating where possible, while the next set of work is developed, hence
the preparation of this first iteration of a new Strategy.  However, in
recognition of the development work required, the next steps are set out in the
new Strategy as: 
i) Refresh and refocus
ii) Further develop and define
iii) Future council programme
iv) Assuring delivery
v) Continued sustainability 
Further iterations of the Strategy will be reported before the recess at which
time approval will be sought for release of investment from the
Transformation Reserve as described in the financial implications section
4(c) below to drive forward the projects within the updated Transformation
Programme. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The new Transformation Strategy is the development of the council
commitment in the Corporate Plan to the values of Ambitious: ensuring
sustainable and efficient services; and Improving: drive improvement,
encourage innovation and invest in transforming to meeting future needs
and forms the Transformation Strategy referred to in the Strategic
Delivery Framework. 
(b) Policy and Legal
None. 
(c) Financial implications
The financial implications of the existing transformation projects
(category C) have been approved in previous reports.   
A number of the new for discovery, added or accelerated / expanding
projects (categories N, I, A and E) will require resources / additional
resources to support their development and delivery.  This is included in
Appendix 1 where the requirement has been identified based on the
stage of development each project has reached and an estimate given
where this is not yet available.  
Page 9

Page 10

It is also anticipated that it may be helpful to engage external expertise to
further expand the programme of work moving forward, particularly in
relation to the areas identified for research and innovation and in
identifying further new opportunities.  This will be reported for
consideration to a future council meeting and would be in addition to
costs below. 
Detailed staff requirements are not yet available across all projects but
estimating the average as being a Grade 9 cost of £60,000 including
oncosts, the total over 2 years for the indicative resourcing in Appendix 1
would be approximately £2million. Cost would be met from the
Transformation Reserve.  Project initiation for those projects listed in
Appendix 1 will be agreed by CMT/SMT as the Project Initiation Board
in line with the Project Management Governance policy. It is expected
that new budget for resources, when approved, would be released on
the basis that return on investment is achieved within 3 years but this will
be clarified in future reports. 
Monitoring reports will continue to the Corporate Committee for oversight
and scrutiny. 
(d) Risk Implications 
The risks associated with the IMP are managed through the relevant
programme boards and overseen by CMT/SMT.  There are no changes
to the current risk profile and it is noted that, with reporting of the first
iteration of the new Transformation Strategy, progress is being made in
maintaining pace which has previously been noted as a risk.  However,
the risks associated with change and the success of transformation
remain and will continue to be monitored. 
In order to manage these risks, the Council will:-  
(i) Ensure that all projects meet a given standard of governance that
is proportionate to the change.
(ii) Ensure there are adequate resources for the overall programme
of work and for individual projects.
(iii) Manage the dependencies and interdependencies across the
scope of the change and its implications for other areas of
prioritised work.
(iv) Appoint appropriate project resources and failing which, review
whether objectives are deliverable and review planned work
accordingly.  
Page 10

Page 11

(e) Staffing Implications
There continue to be challenges in securing resources and service
capacity to progress projects.  However, the allocation of specific project
resources to specific projects is showing impact with projects such as
smarter working and learning estate showing good progress.  This
approach will be built upon as projects are identified and reach an
appropriate stage.  Resourcing at Council level including corporate
programme management and oversight will be revisited as the next
stages of the Transformation Strategy work emerges. 
(f) Property
No direct implications from this report, although property is the subject of
one of the workstreams and the issues arising from this will be reported
in due course with activity on climate change being progressed as a
stand-alone programme of activity.
.
(g) Equalities/Socio Economic Impact
For the purposes of this report an Equality and a Socio Impact
Assessment are not required, however it is acknowledged that various
workstreams will identify change that will have an impact on equalities
and socio economic considerations and will be reported in due course. 
(h) Climate Change and Biodiversity Impacts
There are no immediate climate change implications directly arising from
this report. However, flexible working is one of the workstreams and the
issues arising from this will be reported in due course. 
(i) Consultations
The Corporate and Senior Management team have been involved in the
review work referred to in this report and have been consulted on the
report.  The comments received have been incorporated into the report
and project updates. 
5. CONCLUSION 
5.1 Transformation is a key tool in the Council’s hierarchy of measures to
ensure the council achieves financial sustainability while minimising the
requirement to cut services to close the budget gap.  It is proposed that
the Council agrees the first iteration of a new Transformation Strategy
as set out in Appendix 1, for further development and engagement.  This
revised programme proposes: 
• New opportunities for discovery work have been identified from
horizon scanning (N); 
• Innovation areas for research and discovery to assess future
potential (I)
• Additional projects for initiation have been added to the IMP (A) 
• Expansion or acceleration projects have been identified from
current transformation work (E)and
• Current projects that provide financial savings (C);
Page 11

Page 12

in order to provide a programme of transformation as a foundation for
further transformation for the future council.   
Author of Report: Denise Whitworth, DCE ECOD
Background Papers: Reports updating on progress on Improvement and
Modernisation Programme to: 
12 May 2021 Full Council (Item 09 Report and Appendix
A / B / C / D / E )
15 September 2021 Full Council (Item 15 Report and
Appendix 1 / 2 / 3) 
15 March 2022 Corporate Committee (Item 13a Report
and Appendix) 
30 August 2022 Corporate Committee (Item 06 Report
and Appendix ) 
25 April 2023 Corporate Committee (Item 08 Report and
Appendix) 
7 November 2023 Corporate Committee (Item 07 Report
and Appendix 1 / 2) 
Ref: SPMAN-1108985784-946 / SPMAN-1108985784-947 / 
SPMAN-1108985784-948 
Page 12

Page 13

Appendix 1 
Transformation
Strategy 
Version ShP ID  Reported to
V0.1 SPMAN-1108985784-947 SFC 24/04/2024   
Item 4
Page 13

Page 14

Contents
Transformation Strategy .................................................................................................... 3
National and Local Priorities .......................................................................................... 3
Financial Challenges and Strategy................................................................................. 4
Design Principles for Future Council Transformation .................................................. 5
Framework for Change.................................................................................................... 5
Developing Transformation Strategy: Next Stages ....................................................... 6
List of Transformation Projects ......................................................................................... 8
Project Mandates for New and Revised Projects ............................................................ 13 
Page 14

Page 15

Transformation Strategy 
This is a first iteration of a new, developing Council Transformation Strategy to take
forward a continued focus on delivering transformation projects already in progress,
accelerate and expand where there is opportunity and develop new areas of work to
support the council’s financial sustainability, providing a sound foundation for future
transformation work. 
Transformation is the first step in the Council’s hierarchy of measures to ensure that
it is financially sustainable moving forward.  Key aspects of reform are: 
Transformation to new approaches, including outsourcing, sharing and
commissioning; 
Redesign through streamlining and re-organisation; 
Redefinition of services by stopping or reducing 
Increased income generation 
Whilst income generation and service reduction/cessation are recognised as
separate and lower tier strands of the Savings Hierarchy, major changes in either
area will of necessity also entail an element of transformation in the widest sense.
Transformation and innovation is a key council priority that is reflected in our values
of being Ambitious: ensuring sustainable and efficient services; and Improving: drive
improvement, encourage innovation and invest in transforming to meeting future
needs. 
National and Local Priorities 
Scottish Government’s new deal with Local Government the Verity House
Agreement sets out the way we will work together with a vision for a more
collaborative approach to delivering shared priorities for the people of Scotland.
Three shared priorities have been identified:-
1. Tackle poverty, particularly child poverty, in recognition of the joint national
mission to tackle child poverty 
2. Transform our economy through a just transition to deliver net zero,
recognising climate change as one of the biggest threats to communities across
Scotland, and 
3. Deliver sustainable person-centred public services recognising the fiscal
challenges, ageing demography and opportunities to innovate.  
Page 15

Page 16

Moray Council Corporate Plan has identified the following priorities which can be
aligned to the shared priorities within the Verity House Agreement:- 
We will work with partners, communities and businesses to: 
Tackle poverty and inequality 
• Reduce child poverty and inequalities in incomes, health and education 
• Support vulnerable members of our community 
Build a stronger, greener, vibrant economy 
• Deliver the Moray Growth Deal 
• Focus on a wellbeing economy, one that provides opportunities for all
• Consider the environment and sustainability in everything we do 
Build thriving, resilient, empowered communities 
• Involve and empower our communities in shaping places that people want to live in,
visit and invest in 
• Provide modern and sustainable services, housing and infrastructure that meet the
needs of our communities 
Financial Challenges and Strategy
The Council faces significant financial challenges in the short term with a
requirement to address a shortfall in budget by 2026/27 of £14 million, which will
need to be done through a combination of transformation, efficiency savings,
increased income including Council tax increases and service reductions.
The Medium to Long term Financial Strategy recognises the financial pressures that
the Council will face from increased inflation, interest charges, pay awards,
demographic change and new fiscal arrangements being delivered through the
Verity House Agreement such as the review of ring fenced budgets. 
These pressures mean that the Council will need to:
• adapt to the short term changes brought about 
• balance budgets
• position itself to deliver on the shared priorities and the corporate plan 
• ensure resource is allocated efficiently and effectively in the provision of service both
to and with the public of Moray 
The financial Strategy is framed over the following periods: 
• Short - Less than 3 years: The Council needs to save £14 million (latest est)
by 2026/27, cuts will be severe with little opportunity for mitigation; this short
term activity is essential for a sustainable Council and requires very difficult
choices guided by the future model. 
Page 16

Page 17

• Intermediate 3-6 years: Actions will commence immediately and lead to the
streamlined more sustainable Council outlined above, but will not contribute to
the short term savings required by 2026/27.
• Longer term 6 – 10 years: Actions that lead to the longer term sustainability and
performance of the Council in a financially challenging environment with continued
demand growth and pressures. 
Design Principles for Future Council Transformation 
To address the current and future challenges the Council needs to develop a new
transformation programme and change its ways of working.  It will be helpful to have
a clear core purpose, aims, vision and guiding principles to inform and shape the
developing transformation strategy and to ensure continued consistent focus over
the duration of the work. The principles and ways of working that have been used to
guide transformation to date are attached as Appendix 2. These need to be revised
and reviewed to provide the basis for new transformation and change.  The
Corporate and Senior Management team have undertaken an initial review taking
account of experience to date and used the draft principles below to inform
development of this first iteration of the Transformation Strategy and projects.  It is
proposed that these are used as a basis from which to initiate further consideration
and development of overarching aims and guiding principles for transformation work
with elected members, staff and wider stakeholders:-
➢ Streamlined but efficient, effective and enabled 
➢ Collaborative to utilise the power of partnership with Communities, Business
and Partners in local and regional delivery. 
➢ Entrepreneurial to maximise income, commercial in approach to charging,
income generation and full cost recovery, agile in response to opportunity. 
➢ Innovative and Learning organisation engaged at a regional and national
level. 
➢ Empowering staff through leaner systems, trust and shared understanding of
success 
Framework for Change 
Delivering the vision established through the Corporate Plan and the shared
priorities of the Verity House Agreement in a more streamlined Council requires new
ways of working.  The Future Council requires new approaches and thinking to be
applied to traditional service areas so that need can be met within reduced resources
over the long term.
That fundamental shift is a challenge across local government and work is ongoing
nationally which the council is keen to engage in and learn from at the earliest
Page 17

Page 18

opportunity. Strong leadership and direction will also be needed to steer the council
through a new way of operating.
Recognising that there is currently a time of transition, preparations have been made
for this more fundamental transformation for the future in order to provide a strong
platform for further development of the transformation strategy. 
This first iteration of the developing Transformation Strategy has therefore focussed
on maintaining progress on currently identified projects and identifying scope for
further transformation and innovation to inform the next stages.  The proposed
Strategy is made up of a set of projects to continue the council’s transformation
journey based on:
i) New opportunities for discovery work have been identified from horizon
scanning (N); 
ii) Innovation areas for research and discovery to assess future potential (I);
iii) Additional projects for initiation have been added to the Transformation
Strategy (A);
iv) Expansion or acceleration projects have been identified from current
transformation work; (E) and 
v) Current projects that provide financial savings (C). 
Developing Transformation Strategy: Next Stages 
The importance of pace and progress are recognised alongside the need for
innovation.  To ensure focus is maintained, the new Transformation Strategy is
anticipated to develop over a number of stages as work progresses to fully deliver
current projects, further define those newly identified, identify scope for new projects
and innovate where there are emerging opportunities. 
Stage 1 (6 mths): refresh and refocus - an interim position based on a continued
delivery of current transformation projects with financial benefits.  This will focus the
programme on projects that bring financial savings, and accelerate/expand current
projects that could offer greater or earlier financial gain.  It will also add in new
projects for which project mandates have been prepared and agreed by CMT/SMT
as the project initiation board.  Council approval will also be sought to resource
projects not otherwise previously approved. This stage will ensure that work on
current projects continues and so maintain focus and pace on the need for change
while also leveraging more where possible.
Stage 2 (6-12 mths) – Further develop and define Transformation Strategy - areas
for discovery and development have been noted in the refreshed set of projects,
recognising the need to continue to develop the programme of work, build on
experience and seek external review and challenge to ensure learning from others to
push boundaries and innovate for the next set of projects.  Currently these have only
been identified for research and investigation and so they require to be developed to
Page 18

Page 19

test out the viability and scale of opportunity with business cases being prepared for
those that are agreed to proceed to become projects within the 12 month timescale. 
Progress will be made as quickly as possible within the timescale depending on the
nature and scale of each project.
Stage 3 (12mths plus) – Future Council Programme - It is recognised that further
substantial work is necessary, including identifying approaches that could be
considered for the Future Council.  Initial assessments completed by senior
managers can form a basis to inform and identify opportunities for different ways of
working to move to either as savings projects or to enable future financial benefit by
providing ways of operating to make the council sustainable longer term.
Stage 4 (1- 3 years) - Assuring Delivery with a keen focus on the core benefits of
each project with resourcing and governance in place to ensure that these are
achieved.  This stage will require leadership and resilience to maintain momentum
across a number of high profile, contentious areas that will drive financial
sustainability but will carry wider risk and may not be universally supported by the
community.  Engagement with stakeholders will be a key activity over this stage.
Stage 5 (3-6 years) – Continued Sustainability – it must be recognised that
increasing demand and reducing resources are likely to be a continuing feature for
local government.  Moving into the medium term, opportunities may emerge from
national work, for example in Education and Social Care that the Council can build
from.  A refocus and realignment of the Transformation Strategy will be considered. 
Page 19

Page 20

List of Transformation Projects 
Current (C)
Added (A)
New
opp (N) 
Innovation (I)
Expand/Accel (E)
Project Titles: Phase
Schedule
Budget
Objectives
%
complete
Project Description 
Financial
Benefits (already
in budget)
New
Financial
Benefits (not
already in
budget)
Revenue
required
People
Resources e=
estimate
TRANSFORM EDUCATION 
A 
(from Budget
reports – ref
Council Mtg
25.10.23)
Leisure Review Definition 
A review of Sport and Leisure Services for the
future at a sustainable cost  1.0
18mths
A 
(from Budget
reports – ref
Council mtg
25.10.23)
Libraries Review Definition 
A review of Library and Heritage Services for
the future at a sustainable cost
0
A 
(from Budget
savings)
reports – ref
Council mtg
25.10.23)
Education HQ Business
Admin Support Team  Definition 
Review of Business Administration in
education. (Link with Lean review) 
0.5e
6mths 
E Schools for the Future:
Learning estate review
Acceleration
/ Extension
Improved educational attainment and fewer
Schools operating at greater levels of
occupancy and efficiency 
Needs additional resource to increase pace of
delivery (1.0 possible cross over with current
learning estate work)
Project Mandate
500
(tbc)
112
(tbc)
3.0
30mths
Page 20

Page 21

Current (C)
Added (A)
New
opp (N) 
Innovation (I)
Expand/Accel (E)
Project Titles: Phase
Schedule
Budget
Objectives
%
complete
Project Description 
Financial
Benefits (already
in budget)
New
Financial
Benefits (not
already in
budget)
Revenue
required
People
Resources e=
estimate 
C
Raising Attainment:
Well-being (ASN) Delivery GREEN  GREEN GREEN
38 Review of approach to supporting ASN in
Education to meet need better and bring
service within budget. 
Project was recently re-focussed and changes
agreed at committee project mandate describes
the current project.
Resources in place
Project Mandate
No
addition
al
C
Business Support for
Schools (Schools
Business Admin)
Delivery RED AMBER AMBER
64 Efficiency from digital services and review of
school administrative support 
56 0.5e
6mths 
C
Raising Attainment:
Curriculum Breadth -
Digital Inclusion
Definition GREEN GREEN GREEN
Improved digital infrastructure from mobile
device management solution in schools
Resources already in place
No
addition
al
TRANSFORM COUNCIL
I
Digital Services Research
Identify opportunities for expansion of digital
services and solutions to generate efficiencies
and savings
Resource estimate is for ICT and project
resource.  However, external support potentially
helpful
2.0e
18mths
N
Service Reviews Discovery
Series of rolling reviews across all services with
efficiency target over 2/3 years
Tbc
e.g.
5%/3
yrs
1.0e
24mths 
N Workforce Changes Discovery 
Review of working practices and terms and
conditions 
Project Mandate
100
Tbc
1.0e
12mths
Page 21

Page 22

Current (C)
Added (A)
New
opp (N) 
Innovation (I)
Expand/Accel (E) 
Project Titles: Phase
Schedule
Budget
Objectives
%
complete
Project Description 
Financial
Benefits (already
in budget)
New
Financial
Benefits (not
already in
budget)
Revenue
required
People
Resources e=
estimate 
A
Out of Hours Services Definition     
Consolidation of out of hours call handling to
manage increased volume and expectations
and provide savings
Project mandate 
165  2.0fte
12 t
h
s
i) A 
ii) I
Customer Service and
systems support
Definition 
Research   
Replacement and expanded use of customer
relationship management system (Contact
Centre system)
Note: replacement system is not optional due to contractual
position 
i) Project Mandate 
ii) Potential further development of this project
to expand breadth and depth of services in
contact centre/central support.
25
tbc
45
tbc 
7.0fte
24mths 
ii) tbc  
Asset Management
(was PAMA) Delivery N/A £83K
£200K
Rev.
£250K
Cap.
saving 
No
addition
al 
C o Smarter Wokring
(was Pama Office
Review)
Delivery GREEN £15.5k GREEN
90 Leading to reduced number of offices and
collaboration with Partners   
Resources in place
100   
C o Depot Review –
reporting to EDI
30.4.24
Definition AMBER GREEN GREEN
75 Leading to reduced number of depots and
collaboration with partners including EV fleet
replacement and charging 
tbc tbc  100
tbc
tbc 
C Property Asset Mgmt.
Stage 2 – Shared
Community hubs for
public/3rd sector
On hold   
Later stage of project to assess scope for
shared use of buildings with partners. 
Meantime opportunities taken as they occur       
Service Efficiency –
Lean Reviews
Definition
– been on RED GREEN GREEN
25  Application of LEAN to all Services 250   1.0 e
24mths
Page 22

Page 23

Current (C)
Added (A)
New
opp (N) 
Innovation (I)
Expand/Accel (E) 
Project Titles: Phase
Schedule
Budget
Objectives
%
complete
Project Description 
Financial
Benefits (already
in budget)
New
Financial
Benefits (not
already in
budget)
Revenue
required
People
Resources e=
estimate
C hold and
to be
activated
Requires additional resource to accelerate pace
and incorporate a learning and development
opportunity for staff. 
TRANSFORM ECONOMY 
N
Industrial Estates Discovery   
Discovery to assess possible value of savings
opportunity - strategic level options to assess if
would provide savings at scale down to
approach to individual assets for smaller
savings to be considered.   
tbc 
N
Vehicles (inc pool cars) Discovery   
Discovery to assess possible value re use of
pool cars, etc   
tbc  
A
Net Zero- Minimising
energy use and carbon
emissions.
New –
Definition     
Application of projects to reduce energy use
and switch to renewables to reduce costs and
carbon. 
Investing in renewables and carbon offset to
generate income and prevent future spend and
budget pressures. Cost £170k 
Change the approach to a more collaborative
form of working across the Council to deliver on
long term strategic priorities. 
tbc  
C BIM – FBC to EDI June
2024  Definition  GREEN GREEN GREEN 
To introduce a Building Information
Modelling system to enhance the use of
digital data held on construction projects
and buildings to optimise the efficiency of   
tbc
Page 23

Page 24

Current (C)
Added (A)
New opp (N) 
Innovation (I)
Expand/Accel (E) 
Project Titles:
Phase
Schedule
Budget
Objectives
% complete
Project Description 
Financial
Benefits (already
in budget)
New Financial
Benefits (not
already in
budget)
Revenue
required
People
Resources e=
estimate
the asset during its life where the greatest
costs are incurred.  
Page 24

Page 25

Project Mandates for New and Revised
Projects 
SFC 24/04/2024 – held in Members Only section on CMIS
Page 25

Page 26

Page 26

Page 27

Version 2   Appendix 2
(MC 12-05-21) 
12-05-21 Council added 2 design principles: early intervention and developing the workforce 
Reform Matrix 
Transformation
(different service)
Centralise/ amalgamate in-house; Share services;
Outsource/ Commission;
ALEOs/Trusts 
Redesign of services
(i.e. efficiency – same
service leaner/new
approach)
Digital Services; Redesign Jobs;  Streamline processes
(e.g. contact centre, SharePoint, energy management);
Rationalise asset base (including Schools, CATs); Simplify
Governance 
Redefine Services Stop; Reduce; Community contribution / provision of
services 
Income generation
and commercialisation
Charges; Sponsorship; Council Tax; Investment Portfolio;
New services to compete with private sector; Sale of
assets 
DESIGN PRINCIPLES
The Design Principles and Guidelines establish direction and boundaries for the
formation of this programme of transformation work.
What we want to achieve (the council of the future):
1. Sustainability:  Realistic and sustainable revenue budget position     
Flexibility to meet future change and demand 
Improved outcomes and reduced demand by targeting
early intervention and prevention 
2. Customer Focus:  Increased community capacity and engagement     
Improved outcomes in areas of priority need
3. Priority Resourcing: Deliver evidence based outcomes
Resources re/directed to priorities 
How we will work to achieve this:
• Transformation :
• Be open to alternative delivery models that bring
advantage
Item 4
Page 27

Page 28

Version 2   Appendix 2
(MC 12-05-21) 
12-05-21 Council added 2 design principles: early intervention and developing the workforce 
• Accept measured risks to support, opportunity and
innovation
• Adopt a more entrepreneurial approach to generating
income
• Partnership : 
• Work in partnership and collaborate to secure benefits
that may not be possible on our own
• Develop shared understanding with our communities,
workforce and partners
• Efficiency:    
• Streamline our processes and governance 
• Embrace and exploit technology to our advantage
• Rationalise out asset base aligned to priorities 
• Workforce  Develop the skills, knowledge and capacity of the 
workforce to deliver better 
As a result we expect:
• Balanced budget 
• Re-investment in priority areas - money shifting between services
• Less services and different delivery methods
• Reduced service standards in some areas and improved standards in others
• Greater community self-reliance 
Page 28