Democracy Spraffa

Agenda Document Pack - Moray Council - 06/03/2024

Moray Council · 6 March 2024
Back to Moray Council — 6 March 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Moray Council 
Wednesday, 06 March 2024 
NOTICE IS HEREBY GIVEN that a Meeting of the Moray Council is to be held at
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Wednesday,
06 March 2024 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 18 - 20 of
business on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4. Minute of Meeting of Moray Council on 6 December 2023 7 - 20
5. Minutes of Special Meeting of Moray Council on 12
December 2023
21 - 28
6. Minutes of Special Meeting of Moray Council on 24
January 2024
29 - 36
7. Written Questions ** 
8. Notice of Motion - Report Request on Artificial
Intelligence
37 - 38
Page 1

Page 2

9. Moray Integration Joint Board Summary Report
Report by the Chief Officer, Health and Social Care Moray  
39 - 44
10. Revenue Expenditure 31 December 2023
Report by Depute Chief Executive (Economy, Environment and
Finance)  
45 - 76
11. Capital Plan 2023-24 Q3
Report by Depute Chief Executive (Economy, Environment and
Finance)  
77 - 88
12. Charging for Services
Report by Depute Chief Executive (Economy, Environment and
Finance)  
89 - 92
13. Telford Bridge Craigellachie
Report by Depute Chief Executive (Economy, Environment and
Finance)  
93 -
100
14. Moray Growth Deal Annual Report
Report by Depute Chief Executive (Economy, Environment and
Finance)  
101 -
148
15. Elgin Long Term Town Plan
Report by Depute Chief Executive (Economy, Environment and
Finance)  
149 -
166
16. Review of Standing Orders
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
167 -
196
17. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
18. Voluntary Early Retirement Application [Para 1 and 11]
• 1. Information relating to staffing matters; 
Page 2

Page 3

19. Elgin Community Centre [Para 9]
• 9. Information on terms proposed or to be proposed by or to the
Authority; 
20. Disposal of Surplus Asset [Para 9]
• 9. Information on terms proposed or to be proposed by or to the
Authority; 
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

MORAY COUNCIL 
Moray Council 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Donald Gatt  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Peter Bloomfield  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Neil McLennan  (Member)
Councillor Shona Morrison  (Member)
Councillor Bridget Mustard  (Member)
Councillor Derek Ross  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk van der Horn  (Member)
Councillor Sonya Warren  (Member)
Councillor Ben Williams  (Member)  
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Moray Council 
Wednesday, 6 December 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe, Councillor
John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith,
Councillor Scott Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Neil McLennan, Councillor Shona Morrison,
Councillor Bridget Mustard, Councillor Kathleen Robertson, Councillor Derek Ross,
Councillor John Stuart, Councillor Draeyk Van Der Horn, Councillor Sonya Warren,
Councillor Ben Williams 
IN ATTENDANCE 
The Chief Executive, Depute Chief Executive (Economy, Environment and
Finance), Depute Chief Executive (Education, Communities and Organisational
Development), Chief Officer, Health and Social Care Moray, Head of Governance,
Strategy and Performance, Chief Financial Officer, Head of Housing and Property
Services, Head of Economic Growth and Development, Head of HR, ICT and
Organisational Development, Head of Service/Chief Social Work Officer, Gary
Templeton, Principal Planning Officer, Sport and Culture Manager, Jeanette
Netherwood, Senior Project Officer and the Democratic Services Manager.   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 and The Councillors' Code of conduct the
Council noted the following declarations:  
Councillors Gatt and Warren declared that they were substitute members of the
Moray Integration Joint Board. 
Councillors Cameron, Gordon and Macrae declared that they were members of the
Board of Moray Leisure Centre. 
The Head of Governance, Strategy and Performance advised the Council and in
particular those Councillors who are members of the Moray Integration Joint Board
and Moray Leisure Centre that in terms of Section 5 of the Councillor's Code of
Conduct has a 2 part test with regards to declarations, firstly whether there is a
connection and secondly if that connection leads to a declarable interest.  
Item 4.
Page 7

Page 8

He stated that paragraph 5.4 of the codes states that a connection does not
include being a member of an Outside Body to which a Councillor has been
appointed on behalf of the Council unless there is a particular personal
conflict.  The advice note issued by the Standards Commission for Integration Joint
Board (IJB) members mentioned the potential for conflicts of interest particularly in
the relation to finances and para 4.4 states that as a member of an IJB Councillors
will have to manage such conflicts of interest.  He further added that the advice
note did not give guidance on the line at which a declaration should be made but
stated that in relation to the scrutiny of the budget there may come a point where
Councillors may feel that they get to that line and a declaration needs to be
made.  In the aspect of normal scrutiny and the interests of the IJB and Council are
still aligned there is no issue with participating in discussion and not declaring an
interest.  
There were no other declarations for Group Leaders or Spokesperson in regard to
any prior decisions taken on how members will vote on any item on the agenda or
any declarations of Member's interests in respect of any item on the agenda. 
3.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 17 - 19 of business on the
grounds that it involves the likely disclosure of exempt information of the class.  
Para number
fo the minute Para Number of Schedule 7a
23
Para 1
Information in relation to staffing matters 
24 
Para 6
Information in relation to the financial affairs of any particular
person/s 
25
Para 12
Information in relation to instructions to counsel any opinion of
counsel and any advice received, information obtained or action
to be taken in connection with any legal proceedings   
4.         Minutes of Meeting of Moray Council on 27 September 2023 
The minute of the meeting of Moray Council on 27 September 2023 had been
submitted.  
Councillor Mustard had prior to the meeting notified the Clerk of 2 typos within the
minute which would be corrected prior to final publication.  
The Chair further advised that there had been a change to the wording in
paragraph 16 under Points of Accuracy.  The first paragraph would be changed to
state 'Councillor McLennan sought to identify points of accuracy with the
Page 8

Page 9

Minute.  The Chair allowed Councillor McLennan to raise a point of accuracy on
the minute as the opportunity had not been given earlier'.  
Councillor McLennan, thanked the Chair for agreeing to the amendment, however
sought clarification on why Point of Order raised by Councillor Macrae at the
meeting was not minuted.  
In response, the Head of Governance, Strategy and Performance confirmed that
he had discussed the issue with the Democratic Services Manager when the
minutes were being drafted and took a view that it was not necessary for the
incident to be detailed in the minute as it had been addressed with the apology
from Councillor Macrae and the recording of the apology at the subsequent
meeting on 4 October 2023.  
Subject to the amendment above, the Council agreed the minutes of the meeting.  
5.         Minutes of Special Meeting of Moray Council on 4 October 2023 
The minute of the Special Meeting of Moray Council on 4 October 2023 was
submitted and approved.  
6.         Minute of Special Meeting of Moray Council on 25 October 2023 
The minute of the Special Meeting of Moray Council on 25 October 2023 was
submitted and approved.  
7.         Minute of meeting of Joint Consultative Committee on 31 October
2023 
The minute of the Joint Consultative Committee on 31 October 2023 was
submitted and noted.  
8.         Written Questions 
The Council noted that no written questions had been submitted.  
9.         Notice of Motion - Lift the Ban 
In terms of Standing Order 35a there was submitted a Notice of Motion by Councillor
Fernandes, seconded by Councillor Leadbitter in the following terms:  
Right to work for asylum seekers  
Lift the Ban is campaigning to restore the right to work for everyone waiting for more
than 6 months for a decision on their asylum claim.  
People seeking protection in the UK should be able to work and make the most of
their potential, to provide for themselves and their families, similar to Ukrainian
refugees who do already have the right to work.  
Restrictions on right to work can lead to extremely poor mental health outcomes and
waste of potentially invaluable talents and skills, both for the local economy and
wider society.  
Page 9

Page 10

The Council’s own risk register lists Human Resources (People) at Very High with a
likelihood of 5 out of 5, and that it is “difficult to recruit in a range of areas including
certain subject teachers, vehicle technicians, specialist professional posts, senior
management, clerical and administrative roles, temporary and relief staff, and
community care employees.”  
Allowing people seeking asylum the right to work would lead to positive outcomes
for individuals as well as benefiting public and private sector organisations in the
region who are struggling with recruitment and retention.  
A majority of Scots believe that Scotland needs to attract more people through
immigration to work in key industries and public services.  
In 2022 the Shortage Occupational List was expanded to include positions like social
care, nursing, opening the possibility of employment for people seeking asylum.
Council welcomes the UK Migration Advisory Council report in March 2023 into
labour shortages in the construction and hospitality sectors and the potential use of
the immigration system as a response, with a further report following a call for
evidence due to be published this autumn.  
Action  
Council therefore agrees:  
▪ To confirm support for the Lift the Ban campaign and our belief that the right to
work is a fundamental human right;  
▪ To formally join the Lift the Ban coalition alongside other local authorities,
following the lead of Glasgow who joined earlier this year; and  
▪ To instruct the Council Leader to write to the UK Government urging that they
introduce legislation giving people seeking asylum the right to work, setting out
the significant workforce pressures Moray is currently facing.  
Draft Letter: 
“Dear 
I am writing on behalf of the Moray Council to ask that the UK Government restore
the right to work for people seeking asylum who have been waiting for a decision
on their asylum claim for six months. 
Under the UK Government’s current system people seeking asylum are effectively
banned from working. They can only apply to the Home Office for permission to
work if they have been waiting for a decision for over 12 months and only for jobs
that are on the Government’s restricted Shortage Occupation List.  
This policy is in nobody’s interest. 
At present, people who have risked everything to find safety in the UK are forced
to live on just £8.24 per week to meet all essential living costs, forcing them into
destitution. Instead, people could be using their skills, contributing to the economy
through increased tax revenue and consumer spending, and saving money spent
on asylum support. 
Page 10

Page 11

This is particularly the case in Moray where we are experiencing workforce
shortages in various sectors such as transport, agriculture and the food and drink
industry, as well as in the Moray Council itself, where we are struggling to recruit in
a range of areas including certain subject teachers, vehicle technicians, specialist
professional posts, senior management, clerical and administrative roles,
temporary and relief staff, and community care employees.  
You will be aware that there are currently around fifty people seeking asylum
hosted in the Eight Acres Hotel in Elgin. They are not allowed to work while they
are waiting for their claim to be processed.  
There is significant public support for reform and the UK is currently a major outlier
compared to other countries across North America and Europe, as in almost all
other cases people are able to support themselves at an earlier stage with fewer
restrictions.  
People who have risked everything to find safety in the UK to have the best
chance of contributing to society and integrating into our communities. It is not
effective to waste the talents of our population. 
I would be grateful to hear your views on this matter, and I am looking forward to
your response.” 
Councillor Williams sought agreement from Councillor Fernandes to remove the
wording 'a majority of Scots' as he felt that it looks like the Notice of Motion is
being proposed because it is a popular topic rather than because it is the right
thing to do.  
Councillor Fernandes confirmed that the was happy to remove the phrase.  
The Head of Governance, Strategy and Performance provided some guidance to
Council with regards the correct person to write letters as detailed in this item on
the agenda and the following item.  Where the letter is regarding executive issues,
the letter should be sent by the Chief Executive and where the letter seeks political
type pressure the letter should be sent by the Council Leader. 
Following further consideration the Council agreed the notice of motion and the
letter as stated below with the deletion of 'majority of scots'. 
Dear Minister 
Right to Work for Asylum Seekers: Lift the Ban 
I am writing on behalf of the Moray Council to ask that the UK Government restore
the right to work for people seeking asylum who have been waiting for a decision
on their asylum claim for six months. 
Under the UK Government’s current system people seeking asylum are effectively
banned from working. They can only apply to the Home Office for permission to
work if they have been waiting for a decision for over 12 months and only for jobs
that are on the Government’s restricted Shortage Occupation List. 
Moray Council is of the view that this policy is in nobody’s interest. 
Page 11

Page 12

At present, people who have risked everything to find safety in the UK are forced
to live on £9.58 per week to meet all essential living costs, forcing them into
destitution. Instead, people could be using their skills, contributing to the economy
through increased tax revenue and consumer spending, and saving money spent
on asylum support. 
This is particularly the case in Moray where we are experiencing workforce
shortages in various sectors such as transport, agriculture and the food and drink
industry, as well as in the Moray Council itself, where we are struggling to recruit in
a range of areas including certain subject teachers, vehicle technicians, specialist
professional posts, senior management, clerical and administrative roles, temporary
and relief staff and community care employees.
You will be aware that there are currently around 38 people seeking asylum hosted
in the Eight Acres Hotel in Elgin. They are not allowed to work while they are waiting
for their claim to be processed. 
There is a significant public support for reform and the UK is currently a major
outlier compared to other countries across North America and Europe, as in almost
all other cases people are able to support themselves at an earlier stage with
fewer restrictions. 
People who have risked everything to find safety in the UK to have the best
chance of contributing to society and integrating into our communities. It is not
effective to waste the talents of our population. 
I would be grateful to hear your views on this matter, and I am looking forward to
your response. 
10.         Notice of Motion - Business Rates Incentivisation Scheme 
In terms of Standing Order 35a there was submitted a Notice of Motion by Councillor
Gordon, seconded by Councillor McBain.  
Preliminary issues
None. 
Background
The non-domestic Business-Incentivisation-Scheme (BRIS/NDRIS) was
suspended in 2021 (due to Covid) and has not been re-instated. 
This can (and did) generate extra cash for local authorities, who exceeded a
business rates target as set by the Scottish Government.  Anything gained over
that target was split 50/50 between the local authority and the Scottish
Government. 
This could generate typically for an authority of our size anything from £1 - £2m
(2019/21). 
Action
We ask the Council to send the attached letter to the Deputy First Minister in her
capacity for Cabinet Secretary for Finance; which requests that the non-domestic
rates incentivisation scheme is reinstated. 
Financial implications to Moray Council in producing this report and sending
the attached letter. 
None.  
Page 12

Page 13

References:
https://www.gov.scot/publications/report-barclay-review-non-domestic-rates/  
Proposer:  Councillor Gordon
Seconder: Councillor McBain    
“Draft Letter:  
To the Deputy First Minister (and Cabinet Secretary for Finance).  
Dear Deputy First Minister,
In 2021 the Business Rates Incentivisation Scheme (BRIS) was suspended (due to
Covid) and has not been re-instated.  It was established in 2012 and revised in
2015. 
This scheme enabled local authorities to benefit with extra cash if they exceeded a
target set for them.  It was an incentive for local authorities to raise their NDR tax
base without any resulting deduction from grant aid. 
The extra cash generated by a LA in this way was then split 50/50 with the Scottish
Government. 
The generation of more business rates and such a scheme does not affect
businesses in any way; it does not affect the non-business taxpayer; and it is
money that the Scottish Government does not have to find from the block grant;
money that could provide much needed extra support to local authorities in these
cash-restricted and inflationary times.   
Moray Council ask you to re-instate the Business Rates Incentivisation Scheme.” 
Councillor Leadbitter stated that he had no issue wit the letter but understood that
the 50/50 split is between the Local Authority and the National Rates Pool but
sought clarification from the Chief Financial Officer.    
The Chief Financial Officer confirmed that this was correct.  
Councillor Gordon stated that he was happy to amend the wording.  
Councillor Keith sought to add to the letter a request to review Business Rates in
general as the current system of Business Rates is based on Land Valuation
Scotland Act 1854 which underpins the current calculations of business
rates.  Councillor Keith proposed adding – “Moray Council notes the outmoded
business rates legislation in Scotland and calls upon the Scottish Government to
undertake a wholesale review of Business Rates recognising the important role
that thriving High Streets can have on local communities.”  
Councillor Gordon confirmed he was happy to accommodate the change and
would agree wording with Councillor Keith prior to sending the letter.  
Following further consideration the Notice of Motion was agreed subject to the
agreed amendments to the letter: 
Dear Deputy First Minister 
Page 13

Page 14

Business Rates Incentive Scheme 
I write to you on behalf of the Moray Council to ask that the Scottish Government
considers reinstating the Business Rates Incentive Scheme. 
In 2021 the Business Rates Incentive Scheme (BRIS) was suspended (due to
Covid) and has not been re-instated. It was established in 2012 and revised in
2015. 
This Scheme enabled local authorities to benefit with extra cash if they exceeded a
target set for them. It was an incentive for local authorities to raise their NDR tax
base without any resulting deduction from grant aid. 
The extra cash generated by a Local Authority this way was then split 50/50 with
the Rates Pool. 
The generation of more business rates and such a scheme does not affect
businesses in any way; it does not affect the non-business taxpayer; and it is
money that he Scottish Government does not have to find from the block grant;
money that could provide much needed extra support to local authorities in these
cash-restricted and inflationary times.
Moray Council also notes the outmoded Business Rates legislation in Scotland
and calls upon the Scottish Government to undertake a wholesale review of
business rates, recognising the important role thriving high streets can have in
local communities. 
Moray Council ask you to re-instate the Business Rate Incentivisation Scheme. 
I look forward to hearing from you.  
Councillor McLennan left the meeting during the consideration of this item. 
11.         Varying Order of Business 
With reference to Standing Order 29, the Chair sought agreement to vary the order
of the agenda due to Officer availability.  Items 8, 8a and 9 would be taken as near
to 11am as possible.  
This was unanimously agreed.  
12.         Capital Plan 2023-24 Quarter 2 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) advising Council of expenditure to 30 September 2023
under the capital plan for financial year 2023/24 and of estimates of projected
expenditure profiled into quarters.  
Following lengthy consideration the Council unanimously agreed to:  
i) note expenditure to 30 September 2023 of £8,120,000    
ii) notes the current plan, prior to amendment of £63,531,000 for 2023/24
based on approved expenditure adjusted for known differences in planned
expenditure which have been identified to date, profiled into quarters, as set
out in Appendix 1;
Page 14

Page 15

iii) notes the projected overall expenditure for projects spanning more than one
financial year, as set out in Appendix 2;    
iv) notes the amended projected expenditure in the year as detailed in section
7.1; and    
v) approves amendments to the 2023/24 and 2024/25 capital plan as detailed
in section 6.1 of this report.    
13.         Smarter Working Project - Progress Update 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) providing an update on progress with the Smarter
Working project.  
Following consideration the Council unanimously agreed to:  
i) note the progress on the project to date;    
ii)
note the overall recurring reduction in revenue budgetary requirements of
£56k for 2023/24 and recurring savings of £115k from 2025/26 as set out in
paras 4.14 to 4.23; and    
iii) approve the additional one-off £30k outlined in para 4.11 for telephony and
communication equipment for Buckie Phoenix House.   
14.         Monitoring Officer Report from 1 November 2022 to 31 October 2023 
The meeting had before it a report by the Monitoring Officer informing the Council
on the range of activities undertaken by the Monitoring Officer.  
Following consideration the Council unanimously agreed to note the contents of
the report.  
15.         Review of Outside Body Appointments 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Council of vacancies
which have arisen due to the resignation of several Councillors from Outside Body
Appointments and agree appointments to the vacancies where it is deemed
necessary. 
Councillor Gordon proposed himself as the representative for the North East
Scotland Pension Fund, this was seconded by Councillor Gatt. 
Councillor Gatt proposed Councillor Mustard for the position of Equalities
Champion and Councillor Bloomfield for the role of joint Older Person’s Champion,
this was seconded by Council Dunbar.  
Page 15

Page 16

Following consideration and there being no one other wise minded the Council
unanimously agreed to appoint:  
i) Councillor David Gordon to the North East Scotland Pension Fund from 19
December 2023;    
ii)  Councillor Bridget Mustard as Equalities Champion; and    
iii) Councillor Peter Bloomfield as joint Older Person's Champion.  
Councillor Van Der Horn sought agreement for the Council to appoint a Younger
Person's Champion. 
In response, the Chair confirmed that this could be added to a future agenda as
she felt members did not have enough information before them on the role and
remit of a Younger Person's Champion to allow them to make a decision at this
meeting.  
16.         Moray Integration Joint Board Summary 
The meeting had before it a report by the Chief Officer, Health and Social Care
Moray informing the Council of the latest approved minutes of the meetings of the
Moray Integration Joint Board.  
The Chief Officer acknowledged that consideration will be given to amending the
format of the report following concerns raised by a number of Councillors.  
Following consideration the Council agreed to note the report.  
Councillor McLennan re-joined the meeting during the consideration of this item. 
17.         Annual Report of the Chief Social Work Officer 2022-23 
The meeting had before it a report by the Chief Social Work Officer informing
Council of the annual report of the Chief Social Work Officer on the statutory work
undertaken on the Council's behalf during the period 1 April 2022 to 31 March
2023.  
Councillor Gatt expressed concern about the delay in receiving the report as it had
taken 9 months to be reported to Council.  The Chief Social Work Officer
acknowledged the delay and confirmed that the report will be presented to Council
earlier next year.  
Following consideration the Council unanimously agreed to note the contents of
the report.  
18.         Revenue Budget Monitoring - 30 September 2023 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) advising Council of the revenue budget monitoring
position to 30 September 2023 and the current estimated out-turn for 2023/24.  
Following consideration the Council agreed to note:  
Page 16

Page 17

i)  the budget monitoring position of £332,000 over budget for 2023.24 as at
30 September 2023;    
ii) that this budget position consists of an underspend on Devolved School
budgets of £613,00, an underspend of £459,000 on Children's Services, an
underspend of £505,000 on Environmental Services and an overspend on
Social Care services delivered on behalf of the Moray Integration Joint
Board (IJB) of £1,995,000 and an underspend on other services of £86,000;    
iii) movement of a £2,873,000 increase in General Revenue Grants, as
detailed in paragraph 3.5;    
iv)  the current estimated out-turn for 2023/24 of an overspend in Council
services including Health and Social Care of £1,235,000 after adjusting for
the cost sharing agreement with NHS for MIJB, with underspends in load
charges of £885,000 and slippage in use/reduction in requirement of
provisions of £786,000 resulting in an overall £436,000 underspend and a
decrease in the planned use of Council reserves by £463,000 form that
budgeted for; and    
v) the emerging budget pressure noted in paragraph 6.2.    
19.         Petitions Procedure - Under 18 Year olds 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking the Council to agree the
inclusion of an addendum to the Petitions Guidance/Procedure to allow young
people up to the age of 18 to make representations to the Council.  
Councillor Warren welcomed the report and moved the recommendations in the
report.  
Councillor Van Der Horn confirmed he was pleased to see the report but sought
clarification on Appendix 1 as to what is considered a group.  
The Depute Chief Executive (Education, Communities and Organisational
Development) confirmed that a group is a collective of people with similar views
but confirmed she would be happy to look at alternative wording.  
Councillor Mustard raised concern about using the term 'up to the age of 18' as
some senior pupils could be 18 before leaving school.  
Having heard the concerns raised by a number of Councillors, the Head of
Governance, Strategy and Performance suggested defering the report to the
January meeting of Council to allow some further consultation on the process to
take place with Councillors Warren, Van Der Horn and Mustard.  
Councillor Robertson sought agreement from Council to defer the report and bring
back to the January meeting.  
Having heard the concerns of other Councillors, Councillor Warren withdrew her
motion to agree the recommendations in the report.  
Page 17

Page 18

There being no one otherwise minded Council agreed to defer the report until the
meeting of Moray Council in January 2024.  
20.         Information Reports - if called in 
The Council noted that no Information Reports had been called in.  
21.         Question Time 
In terms of Standing Order 85 the Chair sought agreement to suspend Standing
Order 77 to continue the meeting past 12.45pm to conclude this item on the
agenda.  
Under reference to paragraph 20 of the minute of the meeting of 27 September
2023 Councillor Mustard sought an update on the report that was requested for the
Education, Communities and Organisational Development on the Business
Administration Support for Early Learning and Childcare and Primary Schools due
on 28 November 2023.  
In response, the Depute Chief Executive stated that the full review had not yet
been completed and that it would be 6 - 12 months before a report could be
presented to Committee however was happy to discuss with Councillor Mustard
outside the meeting to determine whether an update report could be considered.    
22.         Resumption of Meeting 
PRESENT  
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe,
Councillor John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes,
Councillor Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor
Sandy Keith, Councillor Scott Lawrence, Councillor Graham Leadbitter, Councillor
Marc Macrae, Councillor Paul McBain, Councillor Neil McLennan, Councillor
Shona Morrison, Councillor Bridget Mustard, Councillor Kathleen Robertson,
Councillor John Stuart, Councillor Draeyk Van Der Horn, Councillor Sonya Warren,
Councillor Ben Williams  
APOLOGIES
Councillor Derek Ross  
IN ATTENDANCE  
The Chief Executive, Depute Chief Executive (Economy, Environment and
Finance), Depute Chief Executive (Education, Communities and Organisational
Development), Head of Governance, Strategy and Performance, Chief Financial
Officer, Head of Economic Growth and Development, Head of HR, ICT and
Organisational Development, Gary Templeton, Principal Planning Officer, Sport
and Culture Manager and the Democratic Services Manager. 
23.         Professional Fees [Para 1] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking Council to consider options
Page 18

Page 19

for professional fees with reference to a previous Council decision on solicitors
practicing certificate costs.  
Following consideration the Council agreed:  
i) note the content of the report; and    
ii) Option 4 (iii). 
24.         Moray Leisure Centre Expansion Proposal Update 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) to update the Committee on
progress made in relation to the Moray Leisure Centre (MLC) expansion proposal.  
Following consideration the Council unanimously agreed to note:  
i) the progress in regards to the conditional points associated with this
proposal; and    
ii) that a further report is provided to the Council within 6 months upon further
resolution of the key conditional points.    
25.         Levelling Up Fund Round 3 - Elgin City Centre Masterplan [Para 12] 
The meeting had before it a report informing the Council that on 20 November the
UK Government announced that Moray Council has been provisionally awarded up
to £18,291,000 for the Elgin City Centre Masterplan - Levelling Up Moray project
as part of the third round of the Levelling Up Fund (LUF).  
Councillor Robertson moved, in reference to recommendation (iv) that 6 monthly
updates be reported to Council.  The Head of Economic Growth and Development
confirmed that this would be possible.  
Following consideration and there being no one otherwise minded the Council
unanimously agreed:  
i) to note the provisional award of £18,291,000 funding for Elgin City Centre
Masterplan from LUF round 3;    
ii) that authority be delegated to the Head of Economic Growth and
Development to work with the UK Government on validation of the bid;    
iii) that upon confirmation of the funding the Head of Economic Growth and
Development in consultation with CMT establishes suitable governance and
staffing structures to progress the LUF round 3 projects; and    
iv) that 6 monthly progress reports be considered by Council.   
Page 19

Page 20

Page 20

Page 21

MORAY COUNCIL 
Minute of Special Meeting of the Moray Council 
Tuesday, 12 December 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe, Councillor
John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith,
Councillor Scott Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Neil McLennan, Councillor Shona Morrison,
Councillor Bridget Mustard, Councillor Kathleen Robertson, Councillor Derek Ross,
Councillor John Stuart, Councillor Draeyk Van Der Horn, Councillor Sonya Warren 
APOLOGIES 
Councillor Ben Williams 
IN ATTENDANCE 
Chief Executive, Depute Chief Executive (Economy, Environment and Finance),
Depute Chief Executive (Education, Communities and Organisational
Development), Head of Governance, Strategy and Performance, Head of
Environmental and Commercial Services, Head of HR, ICT and Organisational
Development, Early Years’ Service Manager, Strategic Services Transport
Manager and Democratic Services Manager.   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Festive Wishes 
As it was the final meeting of the Moray Council of 2023, the Chair wished all members
in the Chamber, online, staff and members of the public a merry Christmas and happy
new year.  
3.         Congratulations 
The Council joined the Chair in congratulating the Human Resources section on work
to achieve the Armed Forces Gold Covenant Award on behalf of the Council.  The Chair
further thanked the reservists who go above and beyond their public service by working
for the Council and in their spare time supporting the Armed Forces. 
Item 5.
Page 21

Page 22

4.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Order 21 and 23 and the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda.  
Councillor McLennan, in terms of Item 6 on the agenda declared that he was a Trade
Union member and advised that a transparency statement as agreed with the
Standards Commission, Monitoring Officer and himself was also sent to the Ethical
Standards Commissioner by the Standards Commission.  He advised that in terms of
Item 6 he has a connection, via his partner’s employment, that could be an interest
that requires to be declared in any discussion on the particular line of the budget that
would directly impact on their post. He did not consider, however, that it would meet
the objective test in respect of the budget as a whole. This is because he does do not
consider that a member of the public, with knowledge of the relevant facts (being that
the connection only applied to one line of the budget) would reasonably regard the
connection as being so significant, in terms of consideration of the overall budget,
that it would be considered as being likely to influence your discussion or decision-
making on the overall budget.  However if line A20 was to be discussed separately he
would leave the Chamber at that point.  
There were no other declarations of Member’s interests in respect of any item on the
agenda.  
5.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media representatives
be excluded from the meeting for Items 17-19 of business on the grounds that it
involves the likely disclosure of exempt information of the class.  
Para Number of the
Minute Para Number of Schedule 7a
9
Para 6, 8 and 9
Information relating to the financial or business affairs of any
particular person(s); and 
Information on proposed terms and/or expenditure to be
incurred by the Authority.
10 Para 1
Information relation to staffing matters.
11
Para 9
Information relating to information on terms proposed or to be
proposed by or to the Authority  
Councillor Van Der Horn sought clarification on why Appendix 6 of Item 6 of the
agenda was being held in confidence as it is the results of a public consultation.  
In response, the Depute Chief Executive (Education, Communities and
Organisational Development) confirmed that the report relates to the budget and
staffing implications therein.  She further added that the results of the public
consultation could be published in a different forum subsequent to today's meeting.  
Page 22

Page 23

On the advice of the Head of Governance, Strategy and Performance, the Chair
sought to continue to agree the resolution as there would be means of releasing the
outcomes of the public consultation following the meeting.  
Councillor Van Der Horn confirmed that he was happy with the approach.   
6.         Recommended Allowances for Kinship and Foster Carers 
The meeting had before it a report by the Chief Officer, Health and Social Care Moray
informing the Council of the recommended allowances for kinship and foster carers.  
Following consideration the Council agreed:  
i) to endorse the adoption of the proposals regarding the recommended
allowances for kinship and foster carers; 
ii) to delegate to the Head of Service for Children and Families and Justice Social
Work to take the necessary steps to implement the Scottish Recommended
Allowance (SRA), to back date any payments made from 1 April 2023 that have
been below the SRA and to ensure that local rates continue to be reviewed as
required to ensure all carers continue to receive at least the Scottish
Recommended Allowance; and    
iii) that the annual review of payable allowances is transparent and that local rates
remain appropriately aligned with the SRA.  This will include a review of the
current Council structure of allowances payable to eligible kinship and foster
carers.    
7.         Charging for Services 
Councillor Allan joined the meeting at the start of the consideration of this item.  
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Council to approve the revised Charging for
Services Policy and agreed the default inflation increase for fees and charges for
Council Services for the period 2024/25 to 2026/27.  
In introducing the report the Chief Financial Officer advised Members that income
generation is a key part of the Council's approved short to medium term financial
strategy and the report is brought to the meeting in support of the strategy and also
attempts to streamline the process.  
Councillor Mustard sought clarification on para 3.6  in relation to the short life review
group of officers who will annually look at the charges and whether some Elected
Members should be on the group as it appears that Members would not have an
oversight of charges for 3 years.  
In response, the Chief Financial Officer confirmed that any proposed increase in
charges which did not follow the policy would come back to Council for consideration
and approval. 
Councillor Leadbitter confirmed that he had similar concerns to those of Councillor
Mustard however on talking to the Chief Financial Officer was assured that Members
Page 23

Page 24

could make alternative suggestions to charges via the budget setting process and
budget meetings.  He further sought agreement that an information report be added
to the agenda yearly, prior to the charges being applied to allow Members to have an
oversight of what the charges will be. 
Councillor Gordon moved to amend recommendation 2.1 (iii) to read 'agrees that
charges increased by the default increase do not require to be brought to Council for
further approval unless there is any charge which is of interest to Members or
exceptional circumstances.'  
In response, the Depute Chief Executive (Economy, Environment and Finance)
confirmed that Councillor Leadbitters suggestion of adding an information report with
all the information on charges which would be on the same agenda as the exceptions
were on would be sensible as it would give members all the baseline information and
should Members wish to bring in charges where the policy approach was not
supported then it could be done as a motion when considering the report rather than
calling in the whole information report.  She further added that recommendation 2.1
(iii) could be amended to include 'noting that full details of charges adjusted in line
with policy will be provided as an information report on the same agenda'.  
Councillor Gordon confirmed that he was happy with the information report proposal
and withdrew his amendment.  
Councillor Keith expressed concern about setting a policy for 3 years as workers do
not tend to get a 3 year pay deal and felt that the charges should continue to be
looked at on a yearly basis.  He therefore moved to agree recommendations 2.1 (i),
(iv) and (v) and amend recommendation 2.1 (ii) that the charges should continue to
be looked at on a yearly basis and to delete recommendation (iii).  This was
seconded by Councillor Ross.  
In response, the Chief Financial Officer clarified that it is not the intention to not report
charges annually to Members, the report is to agree a default increase for charges for
a 3 year period.  This would provide Officers a longer term guidance when reviewing
charges but an annual review of charges would still need to be carried out and
brought to Members in terms of those charges which are not following the default rate
and as has been suggested an information report with a complete suite of charges for
members to review at the same time.  
The Chief Executive further added that the Accounts Commission recommendation is
that Councils start to consider medium to long term financial planning.  
Councillor Robertson, seconded by Councillor Gatt moved the recommendations as
printed with the inclusion of reference to the information report.  
On the division there voted:  
For the Motion (4) Councillors Keith, Ross, Divers and McLennan
For the Amendment (21)
Councillors Robertson, Gatt, Allan, Bloomfield,
Cameron, Colyer, Coull, Cowe, Dunbar, Fernandes,
Gordon, Harris,  Lawrence, Leadbitter, Macrae, McBain,
Morrison, Mustard, Stuart, Van Der Horn, and Warren
Abstentions (0)    
Accordingly the Amendment became the finding of the meeting and the Council agreed:  
Page 24

Page 25

i) the revised Charging Policy, as set out in Appendix 1;    
ii) the default increase for charges for Council services for the period 2024/25 to
2026/27 is the Consumer Price Index including owner occupiers' housing costs
(CPIH) plus 1% as measured for October of the year before the increase takes
effect;    
iii) that charges increased by the default increase do not require to be brought to
Council for further approval noting that full details of charges adjusted in line
with policy will be provided as an information report on the same agenda;    
iv) to request that Moray Integration Joint Board (MIJB) recommend charges for
services delivered under the aegis of MIJB; and 
v) to note that after charges not complying with the default increase are approved
by Council a comprehensive list of all charges for Council services for the
coming financial year will be published on the Council's website.    
8.         Vary Order of Business 
With reference to Standing Order 29, the Chair sought agreement to vary the order of
the agenda due to Officer availability and Item 8 on the agenda would be taken as the
first item in the confidential section.  
This was unanimously agreed. 
9         Buckie Harbour [Para 6, 8 and 9] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of additional dredging works that are
required in Buckie Harbour to ensure that the Council is meeting its obligations.  
Following consideration the Council unanimously agreed to approve additional capital
budget as set out in para 5(c) in relation to additional dredging costs at Buckie
Harbour and agrees Option A as the preferred Option and agrees to Option B, if
Option A is not possible.     
10.         Short to Medium Term Financial Planning [Para 1] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) to consider the revised budget and estimated actual for
2023/24 and consequent revisions to the estimated budget position for 2024/25 and
2025/26.  
Councillor McLennan sought clarification on whether line A20 would be considered
separately.  The Chair confirmed that the budget would be taken as a whole.  
Councillor Dunbar sought clarification on whether the No Compulsory Redundancy
Policy makes it difficult for the Council to achieve savings.  
The Chief Financial Officer confirmed that it makes savings more difficult but does not
preclude savings.  
Page 25

Page 26

Councillor McLennan moved to change recommendation 3.2 (ii) to read 'Defer
savings decision in Appendix 3 until full Scottish Government settlement and Council
Tax freeze financing is known alongside an updated range of budget savings which
shows the options for Councillors to close the gap, once that updated budget gap at
that time.  That decision to be made either at the Full budget meeting in 2024 or a
Special Meeting following COSLA’s Special Leader’s Meeting of the 21 December
2023.'  
In response the Depute Chief Executive (Economy, Environment and Finance) stated
that it was highly unlikely that funding would be available to bridge the budget gap so
delaying the report would not be advisable.  
The Chair asked Councillor McLennan if he had a seconder to his motion.  As there
was no seconder the motion fell and in terms of Standing Order 67 Councillor
McLennan requested that his dissent at the decision be recorded.  
Following consideration the Council agreed to note:  
i) the revised budget and estimated actual for 2023/24 and current estimates for
2024/25 and 2025/26; 
ii) that there is still considerable uncertainty around key budget assumptions in
2023/24 which will further alter the budget gap     
iii) the risk factors set out in section 7of this report; and    
iv)  that the structural deficit of £14 million remains and given ongoing
uncertainties, the Council still requires to make very significant levels of
savings in a short timeframe.      
The Council agreed to approve:  
i) the savings summarised in APPENDIX 3 to this report and consultation
responses, noting that the public consultation responses (APPENDIX 4) have
generally been supportive and any issues raised in the workforce consultation
(APPENDIX 5) will be resolved through normal workforce management
processes; 
ii) the saving from adopting a stationery catalogue for procurement as set out in
paragraph 6.25;    
iii)  amend the saving in relation to outdoor learning and HWRCs as set out in
paragraphs 6.23-6.24;     
iv) the Income Strategy set out in paragraphs 6.1-6.10 of this report;    
v) reduction in the baseline budget for health and social care services from
2024/25 to reflect the reduction in pension costs as set out in paragraph 5.3;
and    
vi) changing council meetings by making 28 February 2024 a Special Full Council
in order to set the budget and 6 March 2024 a standard Council meeting as
set out in paragraph 6.26.
Page 26

Page 27

11.         Moray Education Early Learning and Childcare - Sustainable Rate
Methodologies [Para 9] 
The meeting meeting had before it a report by the Depute Chief Executive
(Education, Communities and Organisational Development) informing the Council of
the ongoing evaluation of the sustainable rate for Early Learning and Childcare (ELC)
funded hours and to provide methodology options for setting the sustainable rate for
the 2024/25 financial year and onwards.  
Following consideration the Council unanimously agreed to:  
i) note the ongoing process to evaluate the sustainable rate for ELC funded
hours;    
ii) a standard methodology for setting the sustainable rate for ELC funded hours
for the 2024/25 financial year and onwards based on Option 1 – Survey
(Costs) with 8% reinvestment included for 2024/25 and 5% reinvestment for
subsequent financial years; 
iii) to consider the allocation of budget to meet this cost for the 2024/25 financial
year and subsequent years based on the agreed standard methodology; and     
iv)  to apply any yearly uplifts based on the standard methodology in April of each
year.       
Page 27

Page 28

Page 28

Page 29

MORAY COUNCIL 
Minute of Special Meeting of the Moray Council 
Wednesday, 24 January 2024 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Tracy Colyer,
Councillor Theresa Coull, Councillor John Cowe, Councillor John Divers, Councillor
Amber Dunbar, Councillor Jérémie Fernandes, Councillor Donald Gatt, Councillor
David Gordon, Councillor Juli Harris, Councillor Sandy Keith, Councillor Scott
Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor Paul
McBain, Councillor Neil McLennan, Councillor Shona Morrison, Councillor Bridget
Mustard, Councillor Kathleen Robertson, Councillor Derek Ross, Councillor John
Stuart, Councillor Draeyk Van Der Horn, Councillor Sonya Warren, Councillor Ben
Williams 
APOLOGIES 
Councillor Neil Cameron 
IN ATTENDANCE 
The Chief Executive, Depute Chief Executive (Economy, Environment and
Finance), Depute Chief Executive (Education, Communities and Organisational
Development), Head of Governance, Strategy and Performance, Chief Financial
Officer, Head of Economic Growth and Development, Head of Environmental and
Commercial Services, Principal Planning Officer, Moray Growth Deal Programme
Manager, Senior Project Officer, Housing Mix Delivery and the Democratic
Services Manager.   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Tribute 
On the invitation of the Chair, Councillor Keith led a tribute to Ramsay MacDonald on
the 100th anniversary of him becoming Prime Minister and acknowledged the
achievement of the 'Lossie Loon'.    
3.         Congratulations to Buckie Thistle Football Club 
The Council joined the Chair in congratulating Buckie Thistle Football club on their
fantastic achievement in the Scottish Cup holding off Celtic for 25 minutes before the
Glasgow team scored their first goal.   
4.         Declaration of Group Decisions and Members Interests *
Item 6.
Page 29

Page 30

In terms of Standing Orders 21 and 23 and The Councillors' Code of conduct
Councillor Williams declared that due the employment of a member of his family he
would leave the meeting prior to the consideration of Item 10 on the agenda.  
Councillor Macrae stated that in terms of transparency for item 6 on the agenda he
was a member of Moray Leisure Board.  
There were no other declarations for Group Leaders or Spokesperson in regard to
any prior decisions taken on how members will vote on any item on the agenda or
any declarations of Member's interests in respect of any item on the agenda.    
5.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media representatives
be excluded from the meeting for Items 17 - 19 of business on the grounds that it
involves the likely disclosure of exempt information of the class.    
Para number of the
minute Para Number of Schedule 7a
14
Para 6
Information in relation to the financial affairs of any particular
person/s. 
Para 8 and 9
Information on proposed terms and/or expenditure to be
incurred by the Authority. 
6.         Moray Integration Joint Board Scrutiny 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) seeking to clarify scrutiny
arrangements for Moray Integration Joint Board (MIJB).  
As part of his introduction of the report the Head of Governance, Strategy and
Performance proposed that report timescales for reports from the MIJB to the Council
would replicate the timescales in which they are reported to the MIJB.  For example 6
monthly or quarterly reports would be presented for the same period to the Council
following presentation to the MIJB.  
Councillor Bloomfield moved that the MIJB Budget Monitoring Reports as detailed in
para 4.2.1 should be presented to meetings of Moray Council and not Audit and
Scrutiny.  
In response, the Head of Governance, Strategy and Performance confirmed that he
was happy to accept that as a direction from the Council and will take on board going
forward.  The option had been left in there as the decision may have been agreed
prior to the publication of the report as anything additional to Audit and Scrutiny
Committee would require an update to the Scheme of Administration .  
Page 30

Page 31

Councillor Mustard raised a concern that the reports before the MIJB were mostly for
noting which did not allow the Board members to scrutinise what was put before
them.  
In response, the Head of Governance, Strategy and Performance confirmed that work
could be undertaken with Board members on their scrutiny role as information is
before them in the reports and guidance could be given to them on how they choose
to deal with the information before them.  He further advised that a training session
with Board members is scheduled to take place in early February and he would be
happy to add this to the session.  
Councillor Morrison sought clarification on whether the quarterly meetings between
NHS Grampian Chief Executive and Chief Financial Officer and their Moray Council
and MIJB counterparts still took place.  
In response the Chief Executive confirmed that they do still take place.  He further
added that the overall question raised today is of governance and trying to create an
understanding of the financial situation of the MIJB and the impact of the service
decisions made by the MIJB.  He acknowledged that more work needs to be carried
out on the timings of the meetings of the MIJB and Moray Council to ensure that a
position is reached where governance over the financial position of both
organisations and impact on service delivery can be achieved.  
Councillor Robertson clarified that in terms of para 4.2.1, there was agreement that
MIJB budget monitoring reports would be reported to meetings of Moray Council and
that there was some division on 4.2.3 and where the MIJB 6 monthly performance
report should be reported, whether it be to Moray Council or Audit and Scrutiny.  
Councillor Leadbitter moved that the 6 monthly performance reports from MIJB are
presented to Audit and Scrutiny Committee.  This was seconded by Councillor Coull.  
Councillor McLennan sought agreement from Councillor Leadbitter to amend his
motion for the reports to be presented to Audit and Scrutiny and where applicable
Education, Children's and Leisure Services Comittee.  
Councillor Leadbitter confirmed he was happy to amend his motion.  
Councillor Macrae seconded by Councillor Gatt proposed that the 6 monthly
performance reports should be reported to meetings of Moray Council and then Audit
and Scrutiny and Education, Children's and Leisure Services Committee where
appropriate.  As he felt that all 26 members had a full focus on the MIJB.  
On the division there voted  
For the Motion (9) Councillors Leadbitter, Coull, Divers, Keith, Lawrence,
McLennan Morrison, Stuart and Williams    
For the Amendment (15)
Councillors Macrae, Gatt, Allan, Bloomfield, Colyer,
Cowe, Dunbar, Gordon, Harris, McBain, Mustard,
Robertson, Ross, Van Der Horn and Warren     
Abstention (1) Councillor Fernandes  
Accordingly the amendment became the finding of the meeting and the Council agreed:  
Page 31

Page 32

i) the reporting arrangements for Council scrutiny of Moray Integration Joint
Board detailed in paragraphs 4.1 and 4.2; 
ii) MIJB budget monitoring reports be reported to meetings of Moray Council;
and 
iii) MIJB 6 monthly performance reports are reported to meetings of Moray
Council, with referral to Audit and Scrutiny or Education, Children's and
Leisure Services Committee when necessary.    
7.         Petitions Procedure - Under 18 Year olds 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) asking Council to agree the inclusion
of an addendum to the Petitions Guidance/Procedure to allow young people up to the
age of 18 or still at school to make representations to the Council.  
Following consideration the Council unanimously agreed the inclusion of an
addendum to the current Petitions Guidance/Procedure that will allow young people
up to 18 years of age or still at school to make representation to the Council.  
8.         Charging for Services 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Council to approve revised charges for Council
services for 2024/25.  
Councillor Fernandes sought clarification on burial charges and Moray and non
Moray residents.  The Chair, suggested that it would be more appropriate for the
issue to be dealt with a revision to the policy through the Economic Development and
Infrastructure Services Committee.  
Councillor Fernandes sought clarification on charge C3a - discounted rate for
exercise referrals of £3.75 and the removal of the discount.  This charge relates to
clients who have been referred by their GP and he sought clarification on the number
people who would be affected by this charge.  
The Chief Financial Officer confirmed that she did have that level of detail and would
ask the Service to clarify the numbers affected.  
Councillor Fernandes said that he was minded to move to increase the charge by
inflation to £3.96.  In response the Chief Financial Officer confirmed that she would
need to speak to the service to determine the reason for the removal of the discount
and the costs involved in the proposed change.  
Councillor Van Der Horn sought to defer the decision on the proposed cruise ship
charges until a report has been brought to Committee to look at implications for the
area on cruise ships using any of the Council's harbours.  
In response, the Head of Environmental and Commercial Services confirmed that it
would be remiss of the Council not to put forward a charge based on the interest
shown and should any pressures arise, then a report could come back to Economic
Development and Infrastructure Services Committee.  However, added that the
interest and scale of the charge is wholly within the capacity of Buckie harbour.
Page 32

Page 33

Councillor Van Der Horn proposed removing the section of the report which refers to
a charge for cruise ships until a further report has been received.  The Chair asked
Councillor Van Der Horn if he had a seconder for his amendment.  As no one
seconded the amendment, the amendment fell.  In terms of Standing Order 67,
Councillor Van Der Horn requested that his dissent be recorded.  
With reference to Councillor Fernandes' question on the number of clients who would
be affected by the GP referral charge increase, the Depute Chief Executive
(Education, Communities and Organisational Development) confirmed that the
referrals are where the Council works with the NHS, however the service is not
funded and the Council need to ensure that as much income is generated as possible
in order to sustain the service as it is currently running at a loss.  Currently there are
100 referrals sitting in the system.  
Adjournment of the Meeting  
The Chair proposed a short adjournment to allow for a discussion between
Councillors and Officers to try and come to an agreement in regards to Councillor
Fernandes’ amendment.  
Resumption of the Meeting 
The Chair confirmed that following discussions during the recess she had spoken
with Councillor Fernandes and had reached a compromise in which the charge at
C3a will go up from £3.75 to £4.30 if the Council were minded to agree the change. 
There being no one otherwise minded the Council unanimously agreed to:  
i) approve the charges for Council services for 2024/25 set out in paragraphs 3.5
to 3.13; 
ii) increase charge C3a to £4.30; and    
iii) note the list of charges including those uplifted by the default of 5.7% and those
outwith the control of the Council.    
9.         Short to Medium Term Financial Plan 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Council to consider the revised budget and
estimated actual for 2023/24, the impact of the draft local government settlement and
consequent revisions to the estimated budget position for 2024/25 and 2025/26.  
Councillor Macrae sought clarification on the sale of Elgin Community Centre as he
understood that the Council had previously agreed that following the closure the
building would be sold.  
In response, the Depute Chief Executive (Economy, Environment and Finance)
confirmed that the approval was for the asset to be sold following the interim use by
VIP Childcare and Elgin Town Hall as part of relocation opportunities for Moray
Growth Deal.  
Page 33

Page 34

Councillor Cowe asked what the cost would be to the Council for keeping the
Community Centre for an additional 18 months as he was aware that there was
interest in the building from potential buyers.  
The Depute Chief Executive (Economy, Environment and Finance) re-iterated that
the options had been set out in the report to Council last June and while that involved
a series of compromises, decisions on where risk lay and the timing at which a capital
receipt could be achieved, it was viewed as being the optimal solution given the
competing demands that the Council faces across Early Learning and the Growth
Deal.  
The Head of Governance, Strategy and Performance expressed caution as the
Council should be looking at the proposals detailed as a whole and not changing
individual projects as this will affect the wider plan and the Council's wider financial
position.    
The Depute Chief Executive (Education, Communities and Organisational
Development) confirmed that support had been given to VIP Childcare in the search
for alternative accommodation for that service but to date no solution has been
forthcoming.  She further added that the places provided for ELC provision are
required to assist the Council in meeting it's statutory obligation of 1140 hours so a
decision to review the future of Elgin Community Centre then time would be needed
to consider how the Council would move the current service delivery in its entirety
while meeting the needs and requirements of the children who currently attend VIP
childcare.  
The Chief Executive acknowledged that all views expressed during the discussion are
valid and it is one of the paradoxes of local government that the public find confusing
when the Council are spending money when it needs to save money.  He further
added that there is a lot of investment going on in the town centre and what is
happening in the Community Centre and Town Hall is to accommodate the inward
investment from the UK and Westminster governments as well as the Council's own
funding.  
He further added that there is interest in the Community Centre site but the interest is
not transient, however he was not clear if the interest would accommodate the
decanting from the town hall and agreed to go away and look at the issue
further.  There would be risks if the Council were to inform the Scottish or UK
Government that there was a change to the profile of the spend but what the risks
would be are unclear.  
Councillor Macrae moved that a report be brought back at the earliest opportunity to
consider alternative arrangements for the decants of VIP Childcare and Elgin Town
Hall to enable the sale of Elgin Community Centre as soon as possible. 
The Chief Executive provided assurance that Officers will re-look at trying to find a
solution to accommodate all parties and bring a report back for consideration.  He
also assured the Council that the criteria for the disposal of all empty properties will
be considered as part of the budget process  
Following further consideration, the Council unanimously agreed to note:   
i) the revised budget and estimated actual for 2023/24 and current estimates for
2024/25 and 2025/26; 
Page 34

Page 35

ii)
that the structural deficit in 2024/25 is now estimated to be £13.4million and the
Council still requires to make very significant levels of savings in a short
timeframe; and  
iii)
that a report will be brought back at the earliest opportunity to consider
alternative arrangements for the decants of VIP Childcare and Elgin Town Hall
to enable the sale of Elgin Community Centre as soon as possible   
10.         Capital Strategy 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Council to approve the amended Capital
Strategy presented in draft as Appendix 1 to this report.  
Following consideration the Council unanimously agreed to approve the amended
Capital Strategy as set out in Appendix 1.  
11.         Capital Plan 2024-25 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking the Council to agree the Council's capital budget
for 2024/25 and to consider the Council's indicative ten year Capital Plan for 2024 to
2034.  
Following consideration the Council unanimously agreed to approve:  
i) capital expenditure of £49,662,000 for 2024/25 as set out in the indicative ten
year Capital Plan in Appendix 1; and    
ii)  that this will be increased by expenditure on Moray Growth Deal as agreed in
the funding agreement with Scottish Government for 2024/25.  
The Council also unanimously agreed to note:  
i) the indicative ten year capital plan inclusive of cap set out in Appendix 2; and    
ii) that the plan remains unaffordable without increased external funding.  
Councillor Morrison left the meeting during the consideration of this item. 
Councillor Williams left the meeting following the consideration of this item.   
12.         Manufacturing Innovation Centre for Moray 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of progress made by the Moray
Growth Deal to prepare a full business case for the Manufacturing Innovation Centre
for Moray (MICM) project and grant delegated authority to enable final approval of the
business case so enabling the project to move into delivery.  
Following consideration the Council unanimously agreed to:  
Page 35

Page 36

i) approve the Full Business Case summarised in this report and contained in
Appendix 1;    
ii) delegate authority to the Depute Chief Executive (Economy, Environment and
Finance) to make any final changes as required following completion of
Government review process, with a view to agreeing final versions of each
FBC to progress to implementation; and     
iii) delegate authority to the Depute Chief Executive (Economy, Environment and
Finance) or other such signatory as may be required to accept the
Government grants for the projects in line with the terms of the Moray Growth
Deal.  
Councillor Morrison re-joined the meeting at this juncture.  
13.         Information Reports - if called in 
The Council noted that no Information Reports had been called in.  
14.         Moray Growth Deal Full Business Cases - Business Enterprise Hub and
Housing Mix Delivery [Paras 6, 8 and 9] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of progress made by the Moray
Growth Deal (MGD) to prepare full business cases for the Business Enterprise Hub
and Housing Mix Delivery Projects and grant delegated authority to enable final
approval of the business cases so enabling the projects to move into delivery.  
In terms of Standing Order 85 the Chair sought agreement from the Council to
suspend standing order 77 to allow the meeting to continue after 12.45pm in order to
conclude the agenda. 
This was unanimously agreed. 
Following consideration the Council unanimously agreed to:  
i) approve the Full Business Cases summarised in this report and contained in
Appendices 1 and 2; 
ii) delegate authority to the Depute Chief Executive (Economy, Environment and
Finance) to make any final changes as required following completion of the
Government review process, with a view to agreeing final versions of the Full
Business Cases to progress to implementation; and     
iii) delegate authority to the Depute Chief Executive (Economy, Environment and
Finance) or other such signatory as may be required to accept the
Government grant for the project in line with the terms of the Moray Growth
Deal.     
Page 36

Page 37

__________________________________________________
NOTICE OF MOTION
TO MORAY COUNCIL
WEDNESDAY 28 FEBRUARY 2024 
Preliminary Issues
None to consider 
Background 
Artificial Intelligence (AI) is rapidly evolving as a consequence of recent
advancements in technology and the design of competing artificial intelligences in a
wide range of environments. 
It is widely reported that the pace of development of AI is highly likely to be the most
rapidly evolving technology ever seen by humankind with many potential applications -
both positive and negative. 
AI is better understood in some industries than others and it is vital that the public
sector, including Local Government is embracing and understanding this issue,
ensuring we have actions in place to help us both utilise AI and manage its impact on
our communities and the services we provide for them. 
At the recent AI Safety Summit the introductory paragraph stated: 
“We are in the midst of a technological revolution that will fundamentally alter the way
we live, work, and relate to one another. Artificial Intelligence (AI) has begun and
promises to further transform nearly every aspect of our economy and society,
bringing with it huge opportunities but also risks that could threaten global stability and
undermine our values.” 
This provides a useful summary of what we require to understand in the deliver of our
own services. 
Action 
• Council requests an officer report providing a high-level assessment of the
Council’s readiness in respect of the rapidly evolving impact of (AI) across our
operations, including but not limited to:
o the risks and opportunities for the broad range of services provided by
the council;
▪ N.B. It should be understood that whilst the Council’s ICT Service
will have a key role to play, the risks and opportunities are much
Item 8.
Page 37

Page 38

broader and could impact significantly on the provision and
structure of a wide range of services
o skills gaps that the Council may have in relation to AI and how they
might be addressed;
o strategies and policies that require to be developed and/or updated in
respect of AI;
o estimated timescales over which such strategies and policies should be
considered;
o the potential risks of not taking action. 
Financial implications
• Any direct costs would relate to further actions, which would be considered in
the requested report.
• There is an indirect cost of officer time, however as AI is a major and rapidly
emerging technology across our services, and which has the potential to both
enhance and disrupt those services in a comparatively short timeframe, it is
expected that officers will already be considering potential implications for their
services and the Council as a whole, therefore this motion sets in place a clear
route for Councillors to consider this urgent emerging issue. 
Proposed By: Cllr Graham Leadbitter 
Seconded By: Cllr Scott Lawrence 
Date Motion Submitted: 20/11/23
Page 38

Page 39

REPORT TO: MORAY COUNCIL ON 6 MARCH 2024 
SUBJECT: APPROVED MINUTES OF MORAY INTEGRATION JOINT BOARD 
BY:  CHIEF OFFICER, HEALTH AND SOCIAL CARE MORAY 
1. REASON FOR REPORT 
1.1 To inform the Council of the latest approved minutes of the meetings of the
Moray Integration Joint Board. 
1.2 This report is submitted under Section II (22) of the Council's Scheme of
Administration relating to the Moray Integration Joint Board (MIJB). 
2. RECOMMENDATION 
2.1 The Council is invited to consider and note the content of this report. 
3. BACKGROUND 
3.1 The MIJB was established on 6 February 2016 under the terms of the Public
Bodies (Joint Working) (Scotland) Act 2014 with full delegation of functions
and resources to enable integration of primary and community health and
social care services effective from 1 April 2016. The MIJB is a separate legal
organisation and acts as principal in its own right. 
The principal ambitions of health and social care integration are to: 
• Support the improvement of the quality and consistency of services for
patients, carers, service-users and their families.
• Provide seamless, joined-up quality health and social care services in
order to care for people in their homes or a homely setting where it is
safe to do so.
• Ensure resources are used effectively and efficiently to deliver services. 
3.2 The approved minutes from the MIJB meetings held on 28 September 2023
and 30 November 2023, which were accepted as correct records of the
meetings on 30 November 2023 and 25 January 204, respectively, can be
found at Appendix 1 and Appendix 2.  A few key highlights from the
meetings for the Moray Council to note were, the MIJB:
Item 9.
Page 39

Page 40

28 September 2023
• Noted a report by the Chief Officer (CO) detailing the CO activities that
support the delivery of the MIJB’s strategic priorities.
• Noted the financial position of the Board as at 30 June 2023 as showing an
overall overspend, noted the progress against the approved savings plan
and noted the budget pressures and emerging budget pressure.
• Approved the virements in budgets from Care Services provided by external
contractors to the Learning Disability Services, Mental Health Services and
Older People and PSD services.
• Noted the revisions to staffing arrangements dealt with under delegated
powers and in accordance with financial regulations within the Council and
NHS Grampian for the period 1 April to 30 June 2023.
• Approved for issue, the Directions arising from the updated budget position.
• Requested an update report is presented to a future MIJB meeting on
prescribing practice. 
• Considered and noted an update report by Dr Gray’s Hospital General
Manager and Integrated Programme Senior Responsible Officer, informing
the Board of the programme status and associated requirements of the MRI
scanner and Ligature Reduction Integrated Programme. 
• Approved progress made on delivery of the actions within the Ministerial
Strategic Group (MSG) Improvement Action Plan as at September 2023. 
• Noted that the Moray Coast Medical Practice had formally notified the
landlord of the Burghead Branch Surgery premises that they are terminating
the lease as of 31 December 2023.
• Noted that the Moray Coast Medical Practice had formally notified Health
and Social Care Moray (HSCM) that they do not intend to reopen the
Hopeman Branch Surgery premises, which they own.
• Noted the mitigating actions that are in place as a result of the closure of
the Burghead and Hopeman branch surgery premises are now incorporated
into the wider Forres and Lossiemouth Locality Planning procedures.
• Agreed to note the current position regarding the Keith (and East) Locality
Project and the further gateways that the project will need to move through. 
• Received a report by the Chief Nurse, informing the Board of the current
situation regarding the Out of Hours Rapid Response Nursing Service
currently hosted by Aberdeenshire IJB and delivered by Marie Curie across
Moray and Aberdeenshire.  The Board noted that notice had been given by
Marie Curie in relation to the cessation of the Rapid Response Out of Hours
Nursing Service aspect of the current contract as of 30 September 2023.  
• The Board noted the requirement for NHS Grampian to deliver an Out of
Hours Nursing Service across Aberdeenshire and Moray in a two phased
approach with the first priority being to ensure continuity of service provision
beyond the notice period for a 6 month period to allow full review of the
service model. The Board will be kept informed of progress. 
• Were informed of the linkages with the NHS Grampian Three Year Delivery
Plan (2023-2026) and the compatibility with the MIJB’s strategic aims and
objectives.  The Board agreed to continue to support the NHS Grampian
Delivery Plan priorities through the local work in Moray of the MIJB. 
• Approved HSCM’s Three Year Delivery Plan (2023-2026).
• Noted the final version of the Annual Performance Report 2022/23, which is
published on the HSCM webpage.
• Noted the Moray Care for People Plan. 
Page 40

Page 41

• Noted a reported by the Chief Social Work Officer and Head of Service
which provided a review of spend for Self Directed Support.
• Approved for publication, on the HSCM webpage, the HSCM Annual
Complaints Report for 2022/23.
• Approved the draft Public Sector Climate Change submission to
Sustainable Scotland Network for the reporting year 2022/23. 
3.3 The link to the webcast and reports submitted to the MIJB meeting on 28
September 2023 can be found here:
https://moray.cmis.uk.com/moray/CouncilandGovernance/Meetings/tabid/70/ct
l/ViewMeetingPublic/mid/397/Meeting/2007/Committee/18/Default.aspx 
30 November 2023
• Noted a report by the Chief Officer (CO) detailing the CO activities that
support the delivery of the MIJB’s strategic priorities, agreeing that
transforming services to meet the aspirations of the MIJB’s Strategic Plan
remains a priority.
• Agreed to acknowledge the findings of the Vaccination and Immunisation
Annual Report 2023.
• Agreed to note the financial position of the Board as at 30 September 2023
is showing an overspend of £5,068,191 on core services.  Noted the
provisional forecast position for 2023/24 and noted progress against the
approved savings plan.
• Noted the revisions to staffing arrangements dealt with under delegated
powers and in accordance with financial regulations with the Council and
NHS Grampian for the period 1 July to 30 September 2023. 
• Approved for issue the Directions arising from the updated budget position.
• Noted that a financial recovery and transformation plan will be brought to
the MIJB at their meeting in January 2024.
• Noted that HSCM, including GMED (the NHS out of hours service) have
robust and deliverable plans in place to manage the pressures of surge at
any time of the year including the festive period.
• Approved the proposed changes to the MIJB Financial Regulations and
noted a review will be carried out annually.
• Noted a report by the Interim Integrated Service Manager, Mental Health
and Substance Misuse informing them of progress and expectations for the
Adult and Older Adult Mental Health Medical team.  The Board agreed that
funding is utilised differently and that the partnership employ Speciality
Doctors on the Certificate of Eligibility for Specialist Registration program. 
• Noted that a Care for People Operational plan has been developed with
partners and the plan will be exercised at a Moray and Grampian level.  At
the request of the MIJB, the operational document will be brought forward to
the next meeting of the Board in January 2024.
• Noted the contents of the Chief Social Work Officer Annual Report for
2022/23.  The Board requested sight of the report earlier in the year next
time.
• Endorsed the schedule of meetings for the Moray Integration Joint Board,
the Audit, Performance and Risk Committee and the Clinical and Care
Governance Committee for 2024/25 with the amended start time of 1.30pm
for the November 2024 and February 2025 Clinical and Care Governance
Committee meetings. 
Page 41

Page 42

• Received a report by the Chief Social Work Officer /Head of Service
requesting the Board note the re-alignment of the Education and Social
Training Team (Social Work Training Team) (with the exception of 1 full
time equivalent (FTE) post which is aligned to Education) from Moray
Council to MIJB.  Following consideration, and following agreement of
Moray Council on 27 September 2023, the MIJB agreed the re-alignment of
the Social Work Training Team, with effect from 1 February 2024. 
Management responsibility will transfer to the Chief Social Work Officer
/Head of Service.  It was noted the budget will remain with the Council. 
3.4 The link to the webcast and reports submitted to the MIJB meeting on 30
November 2023 can be found here:
https://moray.cmis.uk.com/moray/CouncilandGovernance/Meetings/tabid/70/ct
l/ViewMeetingPublic/mid/397/Meeting/2008/Committee/18/Default.aspx 
3.5 Approved minutes, reports and link to webcast library for all MIJB meetings
can be found here:
https://moray.cmis.uk.com/moray/CouncilandGovernance/Committees/tabid/6
2/ctl/ViewCMIS_CommitteeDetails/mid/381/id/18/Default.aspx 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report forms part of the governance arrangements of MIJB; good
governance arrangements will support the Board to fulfil its objectives. 
(b) Policy and Legal
There are no policy or legal implications associated with this report. 
(c) Financial implications
There are no financial implications associated with this report. 
(d) Risk Implications
There are no risk implications associated with this report. 
(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required as there is no change
to policy and procedures resulting from this report. 
(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity implications arising from this
report. 
Page 42

Page 43

(i) Consultations
Consultation on this report has taken place with Corporate Manager,
Health and Social Care Moray who is in agreement with the content in
relation to their area of responsibility. 
5. CONCLUSION 
5.1 This report provides a summary of the business addressed by the MIJB
at their meetings on 28 September 2023 and 30 November 2023. 
Author of Report: Isla Whyte, Interim Support Manager, Health and Social
Care Moray
Background Papers: available online 
Ref: SPMAN-305227695-121 
Page 43

Page 44

Page 44

Page 45

REPORT TO:   MORAY COUNCIL ON 6 MARCH 2024 
SUBJECT: REVENUE BUDGET MONITORING TO 31 DECEMBER 2023 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To advise Committee of the revenue budget monitoring position to 31
December 2023 and the current estimated out-turn for 2023/24. 
1.2 This report is submitted to Council in terms of Section III B (10) of the
Council’s Administrative Scheme relating to monitoring current revenue
expenditure against approved budget. 
2. RECOMMENDATION 
2.1 It is recommended that Committee considers and notes: 
(i) the budget monitoring position of £1,742,000 over budget for 2023/24
as at 31 December 2023; 
(ii) that this position consists of an underspend on Devolved School
budgets of £818,000, an underspend of £116,000 on Children’s
Services, an underspend of £193,000 on General Services Housing
and Property, and an overspend £289,000 on Environmental and
Commercial Services and £210,000 on Economic Growth and
Development. There is also an overspend on Social Care services
delivered on behalf of the Moray Integration Joint Board (MIJB) of
£2,313,000 and an overspend on other services of £57,000; 
(iii) movement of a £5,897,000 increase in General Revenue Grants, as
detailed in paragraph 3.5; 
(iv) the current estimated out-turn for 2023/24 of an underspend in
Council services, including Health and Social Care, of £962,000 after
adjusting for the cost sharing agreement with NHS for MIJB. With
projected overspends in loans charges of £451,000 and increased
use of provisions more than budgeted, this results in an overall
projected overspend of £1,497,000 but with additional funding there
Item 10.
Page 45

Page 46

is a decrease in the use of Council reserves by £125,000 than is
budgeted. 
3. BACKGROUND 
3.1. When the revenue budget for 2023/24 was approved by Moray Council on
1 March 2023 (paragraph 5 of the minute refers), General Revenue Grant of
£193,416,000 was estimated for the year, based on the latest amount notified
to the Council and including estimates for further distributions of grant during
the year. Council Tax receipts of £49,574,000 were anticipated.  Budgeted
expenditure of £260,840,000 was agreed, and this required projected use of
£17,850,000 of the Council’s Ear Marked Reserves to balance the budget.   
3.2. In addition to the Council’s core budget, monies allocated to schools through
the Devolved School Management (DSM) scheme and not spent are brought
forward from previous years.  The DSM balance brought forward in 2023/24
was £853,000 (2022/23 £1,288,000) and on 13 June 2023 Corporate
Committee approved an additional £33,000 to be retained over and above the
permitted DSM allowances, for planned spend at two schools which were not
completed during the academic year due to circumstances out with their
control.  This budget has been reallocated from Covid reserves.  Unused Pupil
Equity Fund of £757,000 received in 2022/23 and £36,000 funding for nursery
snacks and fundraising have been carried forward into 2023/24 in accordance
with the grant conditions. 
3.3. On 28 June 2023 Council approved additional expenditure of £2,158,000 to
be funded from Ear-marked Reserves for Covid.  All of these adjustments
were posted to departments during quarter 1 (para 13 of the minute refers). 
3.4. Additional funding from Covid reserves of £421,000 are reflected in budgets
for quarter 2, including Bus Revolution revenue budget of £74,000, a cost of
living contribution to Moray Food Plus of £16,000, temporary ASN costs of
£299,000 from the additional £1,100,000 approved by Council on 28 June
2023, and the £33,000 DSM adjustment for two schools explained in
paragraph 3.2 above.  Other adjustments of £639,000 reflected in the budgets
are for other service specific earmarked reserves set up at 2022/23 year end
closedown for funding received that required carried forward and used in
2023/24. 
3.5. Variations to General Revenue Grant (GRG) amounting to £5,897,000 have
been notified and actioned. This includes confirmed funding of £3,912,000 for
pay awards which will reduce the required use of reserves. An additional
£50,000 has been allocated to support the resettlement of displaced
Ukrainians. Following discussions between the Scottish Government and
COSLA it was agreed that funding would be provided to introduce a Scottish
Recommended Allowance (SRA) for kinship and foster carers across
Scotland, to be backdated to 1 April 2023. Moray’s allocation for this is
£262,000. The Council currently uses four age ranges to differentiate the
payment of allowances, and the SRA use three. When compared to the SRA,
the rates in Moray are lower across 2 of the SRA age ranges, but higher for
one. At meeting on 12 December 2023, Council endorsed an increase in line
with the SRA rates for the rates below the proposed minimum but maintain the
Page 46

Page 47

rate which is above the SRA rate. The cost of backdating allowances will has
been calculated as £134,000 for the full year. 
3.6. With these adjustments to use of reserves and GRG, the Council’s overall
General Services revenue budget currently stands at £269,812,000. 
3.7. Reconciliation of the movements in the base budget from that which was
approved by the Moray Council on 1 March 2023 is shown in APPENDIX 3
and allocations to departments from the provisions for Inflation and
Contingencies, Additional Costs and Savings are listed in APPENDIX 4. 
4. BUDGET POSITION 
4.1 APPENDIX 1 summarises the current position for each service area,
comparing the actual expenditure with the budget to 31 December 2023. 
4.2 Overall the budget position at 31 December 2023 is expenditure over budget
to date of £1,742,000 or 0.9% of budget to date, which includes services
delivered on behalf of the Moray Integration Joint Board (MIJB).   
4.3 The principal areas of overspend and underspend across the Council are
summarised below. 
4.4 In Education, Resources and Communities there is an underspend of
£50,000.  Sport and Leisure services have over achieved on income by
£112,000 to date; this position is after the budget that was reduced by
£500,000 during Covid was reinstated in full earlier than expected.  Libraries
has an overspend on licences of £66,000 and under achievement of income
from sales, fees and charges of £17,000.  There is a £14,000 underspend on
the Learning Estate Review Team in operational budgets. 
4.5 Children’s Services has an underspend of £116,000 to date, this position is
after a £245,000 saving was actioned in commissioned services during
quarter 3.  A contract for residential care for children with disabilities has
ended due to the transition to adult services of the person cared for, giving a
contract underspend of £128,000.  Contracts for pre-school children with
disabilities and Stronger Safer Families have £42,000 and £48,000
underspend respectively, while a delay of one month for the new contract for
Restorative Practice has left a £21,000 underspend.  Placement Services,
including adoption and fostering fees/allowances and throughcare/aftercare
payments are under budget by £111,000 at quarter 3, and one-off income for
adoption placements by other local authorities in Moray is also ahead of
budget by £71,000.  Within Area Teams, Self Directed Support (SDS)/direct
payments and home to school transport are currently £85,000 and £26,000
over budget respectively, with legal fees and compensation a further one-off
£220,000 overspend. 
4.6 Education has a £642,000 underspend to date.  Devolved School budgets are
underspent by £818,000 at the end of the third quarter; £281,000 in primary
schools and £537,000 in secondary schools; non-devolved budgets are also
under budget on energy costs by £88,000 and £47,000 respectively.  Schools
and Curriculum Development is over budget by a total of £218,000 to date; of
this, central supply is over by £216,000 due to providing teaching cover for
Page 47

Page 48

maternity and sickness absence, and there are other over and under spends. 
ASN is under budget by £31,000, within areas including home tuition and
training.  Early Learning and Childcare (ELC) is currently £128,000 over
budget. This consists of payments to partner providers overspend of £155,000
and an underspend on snack and fundraising accounts of £34,000.   
4.6.1 Environmental and Commercial Services are presenting a net £289,000
overspend to date across services.  Roads Maintenance is £431,000
over spent to date, with £176,000 coming from an overspend in
recharges from Fleet for additional vehicle hire and external contract
hire.  Materials and supplies and services costs are over budget to date
but with recharges to capital and external income from service users
currently ahead of budget, the overspends are considered to be timing
pressures and are expected to level out in the final quarter.  Winter
Maintenance is over budget by £60,000 to date for additional vehicle
hires. Fleet are currently £2,000 under budget in total but within this are
variances that highlight significant price increases within the service. 
Although Fleet recharges to departments recover all elements of the
cost of vehicles and plant, the external costs sit within Fleet and it is
through monitoring of this budget that total variances, both over and
under spends, can be monitored.  Vehicle running costs are £278,000
over budget at quarter 3, with spare parts accounting for £226,000 of
this.  The costs of spare parts have increased by approximately 30% in
recent years.  External vehicle hires managed by Fleet services are
over budget at this point of the year by £184,000 with mainly
Environmental and Commercial Services requiring the vehicles: Lands
and Parks, Public Transport Unit and Roads - as referred to above, this
is a recurring overspend that is kept within the department. 
Expenditure of £41,000 has also been incurred for accident damage
this year to date. 
4.7 Waste has a net underspend of £126,000 in total across various budget
headings.  As was reported in the quarter 2 monitoring report, waste is now
being transported to the new Energy from Waste plant in Aberdeen, with costs
offset by underspends on Landfill Tax and Leachate costs.  During this
transitional year the budgets will require ongoing monitoring and review,
including the impact of reduced gate fees from electricity generated by the
plant.  Income within Waste is under target for this point of the year; green
waste by £60,000 and trade waste by £63,000 to date.  Cleaning and Catering
services is £76,000 under budget; the variance in school catering makes up
£69,000 of this and is after a £150,000 saving on food costs was actioned
following the quarter 2 monitoring report. Lands and Parks are £114,000 over
budget to date with variances on burial ground income, vehicle running costs
and war memorials.   
4.8 Traffic and Transportation is showing a £190,000 overspend to date; various
variances include overspends on school transport costs of £60,000 and a
£31,000 overspend on electric vehicle chargers – there is the possibility to
review and recharge for the Council’s own electric vehicle use.  Other major
variances are due to shortfall in income: car parks £33,000, Traffic income for
Roads Construction Consent £74,000, and Bus Revolution £30,000. 
Consultancy is showing an underspend of £233,000 in total, mainly due to the
£200,000 grant received in Emergency Planning from the Scottish and
Page 48

Page 49

Southern Electricity Networks (SSEN) Resilient Communities Fund. There has
been £4,000 of expenditure to date but the bulk is earmarked for spending on
creating power generation capacity for information and co-ordination hubs. 
Any unspent funds at year end will be earmarked for projects agreed with
SSEN.  Revenue expenditure to date on Flood Prevention and Bridge Works
projects are under budget but this is understood to be due to profiling of
works.   
4.9 Economic Growth and Development Services have a £210,000 overspend
which is primarily due to a shortfall in income in Building Control of £108,000
and Planning of £128,000. The income from street naming and numbering is
above target by £24,000. 
4.10 In Financial Services, a £49,000 underspend is a result from a number of
variances: overspends include £16,000 on postages within Taxation, and
software costs £44,000.  Underspends in the admin grant income for the
Energy Grant Scheme of £20,000, finance software £10,000 and unallocated
service development budget £67,000 offset the variance. 
4.11 Governance, Strategy and Performance is over budget by £5,000 with notable
variances.  Benefits is £160,000 over budget to date due to overspends
including software costs £37,000, Scottish Welfare Fund £68,000 and
Housing Benefits £67,000.  Customer Services is under budget by £4,000;
multi function device contract underspend of £14,000 and an overspend on
software for the Contact Centre of £10,000.  Underspends in other sections
include Legal: income is above target in licences for short term lets of £61,000
and Licensing Board income of £41,000, and underspends in Supplies and
Services of £36,000 
4.12 General Services Housing and Property is under budget by £193,000 in total. 
Homeless temporary accommodation is currently under budget by £37,000
due to additional income from the revised charges policy approved at
Corporate Committee on 31 January 2023 (para 8 of the minute refers);
Improvement Grants are under by £30,000 due to a higher capital grant than
currently budgeted to date; Industrial Estates income exceeds budget to date
by £100,000, partly due to servitude fees but also new rentals and rent
increases.  Repairs and maintenance continue to have an overspend: £64,000
overspend on schools, which is due to the pattern of spend on school
buildings while corporate buildings repairs are £111,000 under to date.  There
is an income shortfall in Property fees of £63,000 due to less capital project
work being carried out than budgeted for in the capital plan. 
4.13 In Other expenditure budgets, an overspend of £28,000 is due to additional
pension costs/strain on the fund overspend of £69,000 and Members Wards
budgets are £41,000 underspent to date. 
4.14 Health and Social Care Services are overspent by £2,313,000 at the end of
quarter 3.  This overspend relates purely to the Health and Social Care
services delivered by Moray Council on behalf of the MIJB. The quarter 3
position for Non-IJB Health and Social Care functions is on budget. 
4.15 Income from external users across the Council are showing both positive and
negative variances and have been noted in the paragraphs above.  Sports
Page 49

Page 50

and leisure facilities budgets appear be back to pre Covid levels earlier than
planned (paragraph 4.4). Income is above budget in Legal Services for short
term lets and other licensing income (para 4.10).  In General Services
Housing (para 4.11), Homeless temporary accommodation has additional
income of £37,000 to date and Industrial Estate income is ahead of target by
£100,000.  Within Environmental and Commercial Services (para 4.7) income
above budget includes Harbours £48,000, Roads £191,000, Catering income
£55,000.  Income is ahead of target in Waste areas including gas extraction,
recycling and bulky waste, but there are shortfalls in green waste and trade
waste income. Within Lands and Parks there is an income shortfall of £65,000
on sale of lairs and interment fees in Burial Grounds, and £34,000 shortfall on
charges for external grounds maintenance and playground inspections. Car
Park income is also under budget to date, as is the Bus Revolution planned
income.  Libraries income has a recurring variance due to loss of income
(para 4.4) and there is a significant income shortfall to date in Planning and
Building Control income as outlined in paragraph 4.8.   
5. BUDGET PRESSURES AND ADDITIONS 
5.1 Local Government Pay Awards continue to be a significant risk to the
Council’s budget. The Scottish Government initially provided confirmed
funding of £155m towards the 2023/24 pay deal; of this the Council have been
allocated £2.596m.  In September 2023 the Scottish Government identified a
further £80m to fund an improved offer which sees some redistribution of
underspends expected in Pupil Equity Funding and Employability, to be repaid
in 2024/25 and future years. The mechanics of these have yet to be confirmed
and are not all included in the budget: £720,000 is included as additional
budgeted Revenue Grant with a further £600,000 currently estimated for the
reprofiled elements.  Further funding coming through the General Services
capital grant for the pay award has also been indicated but amounts not yet
confirmed; an approximated £374,000 is expected.  Councils will also
contribute an additional £10 million; a £170,000 budget pressure has been
added to the Councils budget for this. The full pay offer was backdated to April
2023 with the first element of the pay award paid to staff in November and the
additional element will be paid in January 2024.  Estimated outturns have the
full pay award built in.  Any unfunded element will require to be funded from
the Council’s reserves in 2023/24. The Council have passed on an equivalent
share of funding to Health & Social Care for their pay award. 
5.2 £2.8m of Scottish Government funding has been allocated to Moray for the
Teachers Pay Award, with an additional £800,000 included in inflation pot as
part of the budget. The total increase in teaching staff budgets was over
£4.8m, leaving an unfunded balance of £1.2m to come from Council reserves
in 2023/24. The current agreement is up to August 2024 therefore there is a
continued risk that pay awards agreed beyond that date will be higher than
what is included in the base budget. 
5.3 Budget pressures recognised when the budget was approved on 1 March
2023 are released when the pressure crystallises to the extent that it can be
accurately quantified.  Provisions to meet budget pressures and new duties
are itemised in APPENDIX 4, detailing additional funding confirmed since the
last quarter of £1,985,000 (excluding pay award funding) and also reflecting
the adjustment for the budget pressures categorised red at quarter 2
Page 50

Page 51

monitoring which have been removed or reprofiled in the financial plan if
delayed but still required. Budget pressures totalling £2,906,000 have been
released in quarter 3. 
5.4 Provisions still held centrally at the end of quarter 2 total £6,375,000 and are
detailed in APPENDIX 5 and given a RAG assessment for likelihood of
requirement.   
5.5 Fourteen provisions, totalling £3,654,000, are assessed as amber, being not
yet taken and uncertain if required, or yet to be taken. Seven have had no
draw down of budget this year to date but latest consultations with
departments are that they are still likely to be required, with only School real
time data uncertain of requirement of the £63,000 budgeted.  The Levelling
Up Fund balance of £177,000 may be drawn down as it has the potential to
spend in full if approval of the application is confirmed. Confirmation is
expected at the end of March so this may be required in 2024/25. The
remaining seven classed as amber include free school meals with a balance
of £127,000 available; and approximately £15,000 is required for holiday
provision in the 2023/24 academic year. These along with the remaining
budget pressure with balances will be reviewed as part of the 2024/25 budget
setting process and it is intended that those with planned or committed spend
will be put into earmarked reserves at year end, including those where the
funding requirement follows the academic year i.e. Education Investment
Fund, Additional Support Needs, Raising Attainment. 
5.6 All other provisions are expected to be required in full at this juncture. 
6. SAVINGS 
6.1 Savings and increased charges of £4,415,000 were approved when the
budget was set on 1 March 2023. These savings comprised one-off savings of
£775,000 and other permanent savings of £3,490,000. The increase in
charges per the budget paper was £150,000. 
6.2 In addition to the savings approved when the budget was set, additional
savings/income of £1,480,000 were approved at Moray Council on 28 June
2023 (paragraph 13 of the minute refers), including an increase of £400,000
for Council tax receipts. 
6.3 Savings and increased income posted against departmental budgets in
quarter 3 are itemised on APPENDIX 6. 
6.4 Savings approved in the Short to Medium Term Financial Plan report to
Council on 25 October 2023 totalling £83,000 have also been actioned. 
6.5 In addition to the budgeted savings, the following were also identified:
increase in Nursery rental income was identified, savings from the mothballing
of Crossroads Primary School, and the reinstatement of the leisure income
back to pre-covid levels (ref para 4.4). An earlier budgeted amount for match
funding is no longer required as funding has since been approved from the UK
Governments Shared Prosperity Fund to projects in Moray. Finally, the saving
from Corporate Committee’s decision on 7 November 2023 to refuse the
Page 51

Page 52

application for a renewal of the rent rebate to Keith Golf Club, complete the
adjustments in quarter 3. 
6.6 Of the original approved savings, a balance of £1,182,000 remains in central
provisions as at the end of June.  These are detailed in APPENDIX 6 and
given a Red Amber Green (RAG) assessment for anticipated achievement.
The figures reflect the adjustment for the savings categorised red at quarter 2
monitoring which have been removed or put back in the financial plan if
delayed but still achievable. 
6.7 Approved savings that are now not expected to go ahead, marked in red on
the APPENDIX 6, total £120,000: income from hiring out Roads machinery
and the salary sacrifice scheme for Electric Vehicle and Ultra Low Emission
Vehicles, both still prospective savings but unlikely to be this year. 
6.8 Savings classed as amber total £1,280,000; review of purchasing card
£30,000, which will be across services to ensure that VAT receipts are
submitted per financial regulations and therefore all input VAT reclaimed;
£1,168,000 of a service concession in Education PPP payments; £20,000
saving from the relocation of staff from Auchernack which is reliant on the sale
being completed early in 2024, although the majority of the saving is on rates.
The remaining savings are tentative: Stream 4 review and expansion of
flexible working £44,000; reduction in reinvestment costs in Children’s
Services of £18,000. Some of these may slip into next financial year. 
7 ESTIMATED OUT-TURN 
7.1 APPENDIX 2 summarises the estimated out-turn position for each service
area, comparing the estimated expenditure with the budget to 31 March 2023. 
7.2 Overall the estimated out-turn position for 2023/24 is expenditure over budget
of £1,284,000 or 0.7% of budget for the year, including services delivered on
behalf of the MIJB. 
7.3 Material recurring pressures exist in operational budgets and these have been
included in the projected out-turn position for each service area, and are
discussed below. There are a number of high risk areas that could add further
expenditure to the forecasts, and these need to be managed to reduce the
one-off use of reserves needed to balance this year’s budget. 
7.4 Moray Integration Joint Board (MIJB)
The forecast position for IJB delegated functions at quarter 2, which was
reported to the MIJB on 30 November 2023, is an overspend of £10,600,000
on core services. There are a number of overspends in the core services.  In
Learning Disability service, there are a number of high cost care packages
and increasing demands for care, where people are living longer and more
complex care needs resulting in a projected overspend of £3,500,000. In
addition, the costs for mental health clients have increased by £410,000. The
prescribing budget has been under significant pressure for the last few years
and is forecasting an overspend of £3,500,000 to the end of this financial
year. Older people and PSD services have been under pressure in care
purchased by area teams and permanent care due to the ageing population
Page 52

Page 53

and increased care needs. The Home care service within the care services
provided in-house has recruitment and retention issues and so any
underspending in internal services increases the spend in external services.
This pressure to the year end is £1,136,000. Out of Area placements for
specific individuals for mental health, learning disability and acquired brain
injury by the NHS has seen a significant rise in cases this financial year which
is forecasting an overspend of £971,000. These pressures are being partially
offset by underspends in the strategic funds and an element of reserves not
required in 2023/24 giving a forecast deficit of £4,145,000. The partner
providers are required to pick up this deficit and there is a cost sharing
agreement in place, under which the Council will incur a 37% share of this
deficit. The MIJB is currently working on the quarter 3 position, which will be
reported to the 28 March 2024 committee, the provisional forecast has been
reviewed and is showing an improved position of £3,024,000 overspend. The
Council’s share of this deficit will be £1,119,000. This is shown in APPENDIX
2 as a separate adjustment to the projected overspend on social care services
provided by the Council which is also reflected in the funding section; the
outcome of this MIJB cost adjustment is to reduce the estimated use of covid
reserves. 
7.5 Staffing and Income
Staff savings from vacancies and appointments below top of scale across all
services were anticipated to exceed the overall budget provision by £238,000
at quarter 2.  Since the 2023/24 pay deal was agreed and incorporated into
staffing budgets, the vacancy factor has also been increased in line with the
pay award, as shown in APPENDIX 6.  Income budgets across the Council
are showing both positive and negative variances, with a projected net effect
of £306,000 under achievement.  Section 4 of this report outlined the current
position against budgeted income within departments and many of these have
forecast variances for the year, including: surplus income from leisure,
Industrial Estates, street naming and numbering, licences for short term lets
and other licensing fees, and recycling income. There is a shortfall in income
for Libraries, car parking and public transport income, green waste and trade
waste.  Sale of lairs in Burial Grounds, planning and building control fees are
also expected to remain below target.  Some projected income recognised as
savings when the budget was approved has not been achieved and the
impact of this is reflected in savings held centrally. 
7.6 Education, Resources and Communities
A forecast underspend of £368,000 due to over achievement of leisure
income £137,000 and staff vacancies target £285,000. Offset against these
are forecast overspends through loss of income in libraries £17,000, library
licences £66,000 and PPP costs £22,000. 
7.7 Children’s Services
Children’s Services is forecast to underspend by £425,000, due principally to
a disabilities residential contract forecasting a variance of £264,000 Further
underspends of £104,000 from the review of two contracts going out to tender,
fostering fees and allowances underspend £215,000, throughcare/after care
grants £34,000, adoption allowances and post-adoption support £41,000, one
off income from adoption placement £71,000, vacancy target exceeded by
£275,000 and other contract underspends of £21,000. This is reduced by
Page 53

Page 54

projected overspends in direct payments of £107,000, home to school
transport £40,000 and legal fees and compensation of £484,000. 
7.8 Education
An underspend of £359,000 is forecast across the service area, due
principally to staffing vacancies generating an overachievement of vacancy
target by an expected £500,000, and underspends on energy costs £240,000,
school sanitary products £27,000, clothing grants £5,000, disturbance mileage
£8,000, and a review of the Speech and Language Therapy service £60,000,
and training for Additional Support Needs £10,000.  Overspends are
anticipated on central supply £480,000, payments and insurance excess
payments £58,000. 
7.9 General Services Housing and Property Services
General Services Housing and Property Services are projecting an overspend
of £396,000. As mentioned earlier in this report (paragraph 4.11) there is an
overspend in repairs and maintenance at school buildings and an income
shortfall in Property fees recharges. The latter is due to reduced capital
projects that are rechargeable for the service. The full year effect are
overspends, including: school repairs and maintenance £150,000, Property
fees shortfall £125,000, a staff vacancy target shortfall, and modular unit
storage costs. Underspends include Improvement Grants for repairs of
£30,000 and backdated Industrial Estate rental income £50,000. 
7.10 Environmental Services
An overspend of £352,000 is forecast for Environmental and Commercial
Services, a reduction in the forecast overspend at last quarter, which is partly
due to a revised forecast  for staff vacances.  Overspends in Fleet Services
are mainly as a result of inflationary cost pressures in transport costs
including spare parts and maintenance costs, and the cost of external vehicle
hires for user departments. Traffic and Transportation are projecting a
£378,000 overspend, due to underachievement of income in car parks
£75,000, Traffic Roads Construction Consent income £70,000 and Bus
Revolution £110,000. Overspends on costs for upgrading the car park
machines for revised prices introduced from 1 January 2024 totalled £20,000,
electricity costs for EV charging points £50,000, structural survey for St Giles
car park £13,000, home to school transport £50,000 and £20,000 due to
additional transport requirements for Forres Academy pupils whilst RAAC
remedial works are ongoing.  Waste Management has various over and under
budget projections totalling a net £35,000 underspend; underspends on
recycling income £60,000, advertising £20,000, energy costs £20,000, and
royalties (Dallachy) £20,000, gas extraction income £10,000 and landfill tax
grant scheme £10, against under achievements on green waste income from
green waste permits of £60,000 and trade waste income £65,000. The
estimated outturn figures in APPENDIX 2 include a forecast underspend of
£118,000 for Building Cleaning and Catering.  Parks and Open Space has a
projected overspend of £107,000: £76,000 in Burial Grounds due to sale of
lairs income budget unachieved; Open Spaces costs for additional vehicle
hires and fuel £90,000, and War Memorial repairs and maintenance £13,000.
The overspend would be larger but for the £87,000 underspend on headstone
inspections and tree inspections that was approved as a one off funding from
reserves budget this year and has not been implemented. Finally, the SSEN
grant of £200,000 in Consultancy is creating a variance but will be moved to
Page 54

Page 55

an earmarked reserve for capital or revenue spend in future years and so is
not included in the estimated out-turn for the year. 
7.11 HR, ICT and Organisational Development
HR, ICT and Organisational Development are forecasting a minimal variance,
with an underspend on training offsetting software overspends, and an
unachieved vacancy factor of £42,000. 
7.12 Financial Services
Financial Services has a projected net underspend of £1,629,000. Within this
are overspends in postages of £45,000 and software costs £35,000. Projected
underspends are a forecast staff vacancy target surplus of £63,000 and
Interest on Revenue Balances (IORB) exceeding budget by £1,646,000. This
is a substantial increase in the IORB previously forecast due to a review of the
average interest rates applied to revenue balances. Whilst this is a positive
change within this service, the counterbalance is reflected by an increase in
Loans charges, explained below in paragraph 8.16. 
7.13 Governance, Strategy and Performance
Governance, Strategy and Performance have a net £168,000 underspend
projected. Overspends on housing benefits of £100,000 and software costs;
Benefits team £32,000 and the Contact Centre £10,000. Underspends include
the multi function device contract payments £15,000 arising from the change
over onto the new contract, but it is expected that as new devices are rolled
out the lease payments will resume at budgeted levels.  Other underspends
are additional income from Licensing and Short Term Lets £80,000 plus other
supplies and services budgets £10,000. Staff vacancy targets are projected
over budget by £205,000. 
7.14 Other
There are other overspends for additional pension and Strain on the Fund
costs totalling £83,000. 
7.15 Loans Charges
Loans charges budgets were increased this year by £2,000,000 as part of the
budget setting process. At quarter 2 an underspend of £885,000 was forecast;
this has since been revised to an overspend of £451,000 and is primarily
coming from an increase in Interest On Revenue Balances (IORB) (ref 8.13),
plus a small increase in forecast interest payable and expenses on external
Council borrowing, the total of which are allocated in full across the Council’s
internal loans pool. The 7 day interest rates used in the calculation of the
IORB have gradually increased from 4.2% in April 2023 to over 5% since
August 2023 and is currently 5.17%. Forecasting with the rate to remain at
this level, the average rate applied in the 2023/24 calculation is 4.9%; for
comparison, the 2022/23 rate was 2.1%. 
7.16 Central Provisions
Centrally held provisions have a negative variance to date of £2,773,000
which is expected to decrease to £2,008,000 by year end. The provision for
Contingencies and Inflation are over budget due to the drawn down of pay
award budgets which have now been applied to salary budgets. The draw
down comes from the provision for Inflation whilst funding from the Scottish
Government has been applied to the Scottish Government Grant budget.  A
Page 55

Page 56

total budget of £8,391,000 was approved for Inflation, including contract
inflation and pay awards, which allowed for a 3% pay award across Teaching
and Non-Teaching staff. The total effect of the 2023/24 pay settlements was
an increase to budgets of £10,896,000, excluding Health & Social Care where
a proportional contribution of £1,072,000 was made from the grant funding
received. Other inflationary increases expected and still to be applied to
budgets are external audit fee increase, software indexation and
apprenticeship levy.  In total, £14,916,000 of inflation requirements are
expected for this year.  Grant funding to support the 2023/24 pay deal is
estimated at £7,090,000, although some allocations are not yet confirmed.
Together with the inflation budget, this leaves a small balance of contingency.
These are reflected in the anticipated variance in the appendices. 
7.17 Additional Costs of £271,000, including the remaining budget pressure
requirements as discussed in section 5 are estimated to be drawn down by
the end of the year. Those unused will be put to earmarked reserves at year
end. This includes Whole Family Wellbeing Fund (WFWF) £545,000 where
decisions on how the funds are spent are made by the Community Planning
Partnership.  Similarly, the balance of the one year budget for Education
Investment  £259,000, the additional ASN funding £1,235,000 (which are both
being spent over the academic year) and Ukrainian resettlement funding
£381,000 will be required for future use and will go to earmarked reserves at
year end. 
7.18 Savings outstanding were discussed in section 7 and the amber savings
expected to be achieved this year have been included in the estimated outturn
figure in APPENDIX 2.  (Review of purchase card £30,000, Service
concession £1,168,000 and Reduction in investment in Children’s Services 
£18,000). If these are realised as anticipated there will be an overachievement
of the revised budgeted savings of £34,000 in the year. 
8 RESERVES 
8.1 The balance on free general reserves (excluding DSM and ear-marked
reserves) as of 1 April 2023 was £5,000,000.  This is the minimum level of
reserves that can be held on free general reserves in terms of the Council’s
reserves policy. 
8.2 When the budget was set, use of £15,478,000 of Covid ear-marked reserves
to balance the budget was approved.  The report to Moray Council on 28 June
2023 for the Revenue out-turn variances approved an additional use of covid
ear-marked reserves totalling £2,158,000 (paragraph 13 of the minute refers).
The variance analysis adjustments also reflected a reduction in the use of
reserves of £1,589,000 due to additional savings and income.  Temporary and
permanent budget pressures in Additional Support Needs (ASN) were
reported to that same meeting and £1,800,000 was approved to be funded
from this reserve.  Further adjustments have also been approved in quarter 2
and taken into account on the appendix; additional funding for the Teacher’s
and non-teaching pay agreements has been announced, some confirmed
while other allocations are expected. The pay award funding for both revenue
and capital, streams is also reflected in the figures as these will reduce the
requirement for use of reserves.  APPENDIX 7 itemises the movements on
reserves approved during the year to date and gives the uncommitted balance
Page 56

Page 57

on the reserve of £14,496,000 at 31 December 2023.  The quarter 3 position
is that £10,782,000 of covid reserves are budgeted to be used in 2023/24 and
£11,776,000 is currently estimated at this time. With the MIJB cost adjustment
(paragraph 7.4) this would reduce the use of reserves by £1,119,000 to
£10,657,000, £125,000 less than budgeted. 
8.3 Uncommitted balances at 31 December 2023 for other ear-marked reserves
are £3,791,000 for Transformation and £5,881,000 for Council priorities.
There is also a reserve for the Moray Growth Deal with a free balance of
£4,000,000 as at 31 December 2023; the £759,000 approved at budget
setting is not required this year due to slippage in projects. 
9 SUMMARY OF IMPLICATIONS 
(a) Moray 2026: A Plan for the Future and Moray Corporate Plan
Effective budget management is an essential component of delivery of
Council priorities on a sustainable basis. 
(b) Policy and Legal
No policy or legal implications arise directly from the contents of this
report. 
(c) Financial implications
The financial implications are addressed throughout the report. 
(d) Risk Implications
There are no risk implications arising directly from this report. Budget
managers are aware of their responsibilities for managing their budgets
in accordance with the Council’s Financial Regulations. There is a risk
to the Council arising from the agreement that if the Moray Integrated
Joint Board overspends the Council will meet 37% of the additional
costs incurred and this risk is projected to materialise. Inflation
continues to present a risk to the Council’s budget. 
(e) Staffing Implications
No staffing implications arise directly from this report. 
(f) Property
No property implications arise directly from this report. 
(g) Equalities/Socio Economic Impact
No equalities implications arise directly from this report. 
(h) Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this
report. 
(i) Consultations
Consultation concerning Revenue Budget Monitoring is an on-going
process with budget managers across the Council. CMT and Heads of
Service have also been consulted in the preparation of this report and
any comments incorporated. 
Page 57

Page 58

10 CONCLUSION 
10.1 The financial position of the Council at the end of December 2023 is
an overspend against General Services Revenue Budget of
£1,742,000, including Health and Social Care services delivered on
behalf of the Moray Integration Joint Board. 
10.2 Variations in General Revenue Grant totalling £5,897,000 have been
notified to the Council. 
10.3 The estimated out-turn position is for an over spend of £1,497,000,
but with additional funding the estimated use of Council reserves is
£125,000 less than budgeted. 
10.4 The Council has estimated use of £10,657,000 from Covid ear-marked
reserves in 2023/24. 
Author of Report:  Susan Souter, Senior Accountant
Background Papers:  Held by author
Ref: SPMAN-1293228629-1032 
Page 58

Page 59

APPENDIX 1
MORAY COUNCIL - APPENDIX 1
BUDGET MONITORING REPORT
QUARTER 3 to 31 DECEMBER 2023
Service
Revised Budget
2023/24
£000s
Budget to 30 Dec
2023
£000s
Actual &
Committed to
31 Dec 2023
£000s
Year to date
variance
£000s
Education, Resources & Community 14,783 11,279 11,229 50
Childrens Services 19,663 13,940 13,824 116
Education 102,138 73,244 72,602 642
General Services Housing & Property 5,533 3,424 3,231 193
Environmental & Commercial Services 30,062 20,869 21,158 (289)
Economic Growth & Development Services 4,433 3,875 4,085 (210)
HR, ICT & Organisational Development 6,456 5,387 5,335 52
Financial Services 2,116 2,083 2,034 49
Governance, Strategy & Perfomance 6,669 5,788 5,793 (5)
Other Services 2,746 2,142 2,170 (28)
SERVICES excl HEALTH & SOCIAL CARE 194,599 142,031 141,461 570
Health & Social Care (IJB) 61,475 42,995 45,308 (2,313)
Health & Social Care (Non IJB) 104 77 76 1
TOTAL SERVICES incl HEALTH & SOCIAL CARE 256,178 185,103 186,845 (1,742)
Loans Charges 16,407 0 0 0
Provision for Contingencies and Inflation (5,689) 0 0 0
Additional Costs 4,098 0 0 0
Unallocated Savings (1,182) 0 0 0
TOTAL PROVISIONS (2,773) 0 0 0
TOTAL GENERAL SERVICES EXPENDITURE 269,812 185,103 186,845 (1,742)
Commentary on Quarter 3 Performance
Overall the budget position at 31 December 2023 is expenditure over budget to date of £1.7m, or 0.9%, which
includes services delivered onm behalf of the Moray Integration Joint Board (MIJB).
Childrens Services: Underspend on a contract for residential care for children with disabilities, out of area
placements, and adoption/fostering fees. Within Area Teams, direct payments and home to school transport are
over budget.
Education: Devolved School budgets are underspent by £818k at the end of the third quarter; £281k in Primary
schools and £537k in Secondary schools. Non-devolved budgets are under budget by £88k and £47k respectively.
Environmental & Commercial Services: There is a net overspend of £289k to date across the services. The main
issues include overspends on school transportation, vehicle running costs and winter maintenance, combined
with a shortfall in incomes. Underspends in Waste due to the Energy from Waste plant costs offset by underspends
on Landfill Tax.
Economic Growth and Development Services have a net overspend due to a shortfall in Building Control and
Planning fees income.
6.1%
7.5%
39.6%
1.8%
11.3%
2.1%
2.9%
1.1%
3.1%
1.2% 23.2%
0.0%
Budget YTD
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB) Health & Social Care (Non IJB)
6.0%
7.4%
38.9%
1.7%
11.3%
2.2%
2.9%
1.1%
3.1%
1.2% 24.2%Actual YTD
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB)
(2,500)
(2,000)
(1,500)
(1,000)
(500)
0
500
1,000
£000's
YTD Actual Variance to Budget (excl Loans & Provisions)
Education, Resources & Community Childrens Services
Education General Services Housing & Property
Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services
Governance, Strategy & Perfomance Other Services
Health & Social Care (IJB)
Item 10.
Page 59

Page 60

Page 60

Page 61

APPENDIX  2
MORAY COUNCIL - APPENDIX 2
BUDGET MONITORING REPORT
QUARTER 3 to 31 DECEMBER 2023
Service
Revised Budget
2023/24
£000s
Estimated
Outturn 2023
£000s
Anticpated
Variance
£000s
Variance vs Base
Budget
%
Education, Resources & Community 14,783 14,415 368 2.5%
Childrens Services 19,663 19,238 425 2.2%
Education 102,138 101,779 359 0.4%
General Services Housing & Property 5,533 5,929 (396) (7.2)%
Environmental & Commercial Services 30,062 30,201 (139) (0.5)%
Economic Growth & Development Services 4,433 4,475 (42) (0.9)%
HR, ICT & Organisational Development 6,456 6,453 3 0.0%
Financial Services 2,116 487 1,629 77.0%
Governance, Strategy & Perfomance 6,669 6,501 168 2.5%
Other Services 2,746 2,829 (83) (3.0)%
SERVICES excl HEALTH & SOCIAL CARE 194,599 192,307 2,292 1.2%
Health & Social Care (IJB) 61,475 65,792 (4,317) (7.0)%
Health & Social Care (Non IJB) 104 102 2 1.9%
Adjustment to reflect cost sharing agreement 0 (3,198) 3,198 -
TOTAL SERVICES incl HEALTH & SOCIAL CARE 256,178 255,003 1,175 0.5%
Loans Charges 16,407 16,858 (451) (2.7)%
Provision for Contingencies and Inflation (5,689) 180 (5,869) 103.2%
Additional Costs 4,098 271 3,827 93.4%
Unallocated Savings (1,182) (1,216) 34 (2.9)%
TOTAL PROVISIONS (2,773) (765) (2,008) 72%
TOTAL GENERAL SERVICES EXPENDITURE 269,812 271,096 (1,284) -0.5%
Funded By:
Scottish Government Grant 204,228 204,228 0 0.0%
Pay Award Funding via Capital Grant 0 2381 (2,381) 0.0%
Council Tax 49,974 49,974 0 0.0%
Funded From Reserves:
DSM c/f 1,646 1,646 0 0.0%
Transformation 1,081 1,081 0 0.0%
General/earmarked 1,342 1,342 0 0.0%
Covid 10,782 11,563 (781) (7.2)%
MIJB Cost Adjustment 0 (1,119) 1,119 0.0%
MGD Cash Flow 759 0 759 100.0%
TOTAL FUNDING 269,812 271,096 (1,284) (0.5)%
OVERALL VARIANCE 0 0 0
Commentary on Quarter 3 Performance
Childrens Services: projected underspend from review of contracts going out to tender, the disabilities
residential contract, fostering fees and allowances underspend and one off income from adoption placement.
Overspends in direct payments and home to school transport.
General Services Housing & Property: overspend estimated on school repairs and maintenance
combined with a property fees recharge shortfall.
Financial Services: a projected underspend is forecast. Within this are overspends in postages and
software costs. A large underspend on the budgeted Interest on revenue balances due to an increase in
average rate applied to balances. This positive variance is counterbalanced by an increase in Loans charges.
5.5%
7.3%
37.9%
2.1%
11.1%
1.6%
2.4%
0.8%
2.5%
1.0% 22.8%Budget 2023/24
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB)
5.3%
7.0%
37.1%
2.2%
11.0%
1.6%
2.4%
0.2% 2.4%
1.0%
24.0%
0.0%Est Outturn
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB) Cost sharing agreement
Health & Social Care (Non IJB)
(2,000)
(1,500)
(1,000)
(500)
0
500
1,000
£000's
Est Outturn Variance to Budget (excl Loans & Provisions)
Education, Resources &
Community
Childrens Services
Education
General Services Housing &
Property
Environmental & Commercial
Services
Economic Growth &
Development Services
HR, ICT & Organisational
Development
Governance, Strategy &
Perfomance
Other Services
Health & Social Care (IJB)
Health & Social Care (Non
IJB)
Item 10.
Page 61

Page 62

Page 62

Page 63

Allocated
Budget
Provisions for
Contingencies
and Inflation
Additional
costs
Savings Budget Loan
Charges
Depreciation Total
Budget
£000s £000s £000s £000s £000s £000s £000s £000s
1 March 2023 231,397 4,182 15,269 (4,415) 246,433 14,407 260,840
School carry forwards 853 853 853
PEF carry forwards 757 757 757
ELC carry forwards 36 36 36
Funded from reserves - approved MC 28/06/23 2,158 2,158 2,158
Funded from Transformation Earmarked Reserve 76 76 76
Funded from Covid Earmarked Reserves 128 128 128
Adjustment 1 6,850 (5,908) (3,013) 2,071 0 0
Adjustment 2 - move inflation pot - 5,098 (5,098) 0 0
Corporate Committee 29/8/23 242,255 3,372 7,158 (2,344) 250,441 14,407 0 264,848
Funded from Covid Earmarked Reserves 421 421 421
Funded from Other Earmarked Reserves 639 639 639
Additional GRG 0 2,873 2,873 2,873
Adjustment 3 4,933 (1,470) (5,928) 465 (2,000) 2,000 0
Moray Council 6/12/23 248,248 1,902 4,103 (1,879) 252,374 16,407 0 268,781
Additional GRG:
Redeterminations - Pay Awards 3,912 3,912 3,912
Redeterminations - Other 0 1,985 1,985 1,985
Funded from Transformation Earmarked Reserve (608) (608) -608
Funded from Covid Earmarked Reserves (4,258) (4,258) (4,258)
Adjustment 4 - Reduce/remove red Category (MC
6/12/23)
301 (1,060) 759 0 0
Adjustment 5 - Additional costs/savings identified 326 1,976 (2,302) 0 0
Adjustment 6 - Drawn down in the quarter 8,257 (7,591) (2,906) 2,240 0 0
Moray Council 28/2/24 256,178 (5,689) 4,098 (1,182) 253,405 16,407 0 269,812
APPENDIX
3
APPENDIX 3
Item 10.
Page 63

Page 64

Page 64

Page 65

ALLOCATIONS FROM PROVISIONS SINCE 30 SEPTEMBER 2023
Provision for Contingencies and Inflation Committee reference £000s £000s
Balance at 30 September 2023 1,902
Pay Awards - SJC (7,124)
Contract Inflation (29)
Fostering Allowances (60)
Insurance increase (137)
Other - Gritting Salt increase (165)
Other inflationary increases (5)
Education DSM Adjustment 27
Contingency adjustments (98)
(7,591)
Balance at 31 December 2023 (5,689)
Additional Costs £000s £000s
Balance at 30 September 2023 4,103
Movements in General Revenue Grant
Additional funding
Scottish Recommended Allowance - Kinship and Foster
Carers
262
Ukrainian Resettlement (share of £3.2m) 50
Temporary Accommodation - per f/c 8/23 29
Educational Psychologists - per f/c 8/23 9
Teacher Induction Scheme 1,635
1,985
Additional Budget Pressures approved since budget set
Additional Support Needs (ASN) MC 28/6/23 1,800
Additional Waste crew - increased routes MC 6/12/23 136
HR post - no compulsory redundancies budget pressure MC 6/12/23 40
1,976
Reduce/remove Red Category Budget Pressures MC 6/12/23 (1,060)
(1,060)
Budget pressures drawn down in quarter 3
Teaching - PT Raising Attainment & Flexible Learning (41)
School Roll - increased Transport costs (50)
School Roll adjustments (251)
Free School Meal expansion (78)
DSM class contact time review (9)
Schools - Education Investment Fund (44)
Additional Support Needs (ASN) (496)
Development Plan Scheme - transportation appraisals (100)
Additional Waste crew - increased routes (136)
HR post (42)
(1,247)
Budget Pressures Funded from Transformation ear marked reserves
Raising Attainment (8)
(8)
Service Developments
Youth Work (Buckie & Forres) (56)
(56)
Additional funding allocated
Scottish Recommended Allowance - Kinship and Foster
Carers
(155)
NQT funding to March 2024 (1,440)
(1,595)
Balance at 31 December 2023 4,098
Savings & Charges £000s £000s
Balance at 30 September 2023 (1,879)
Additional Savings/income identified since budget set (2,302)
(2,302)
Reduce/remove Red Category Savings MC 6/12/23 759
759
Permanent savings approved when budget set:
Harbours commercial income 336
Transportation and Consultancy recharges 142
Property Services admin 26
Increase vacancy factor in line with pay awards: 309
3 weekly recycling collection 136
Temporary savings approved when budget set:
Grampian Valuation Joint Board - Refund of 2022/23 surplus 46
Dallachy spare capacity income 200
Savings identified after budget set:
D1-2 School Catering Budget 150
Catering - Dynamic Pricing 6
Homelessness - discount for block purchased temp accom Special MC 10
Homelessness - Allocate further 5 flats for homeless accom Special MC 5
Property - commercial approach to rent reviews Special MC 50
Customer Service - printer contract Special MC 12
Improvement & Modernisation Prog) Care placements ECLS 26/01/22 245
Travel and Subsistence recurring savings (Smarter Working) MC 28.6.23 50
Increase in Nursery Rental Income 8
Crossroads PS - Mothballing 122
Reverse Covid reduction in Leisure Income 300
Match funding no longer required Building Financial resilience
to shared prosperity fund
82
Remove rent rebate to Keith Golf Club Corporate 7/11/23 5
2,240
Balance at 31 December 2023 (1,182)
APPENDIX 4
Item 10.
Page 65

Page 66

Page 66

Page 67

APPENDIX 5
BUDGET PRESSURES
Description Approved
Amount
Adjusted
Amount
Drawn
Down
Balance Status Qtr 3 reason for balance
RECOGNISED WHEN BUDGET SET £000 £000 £000 £000
Social Work
Education Resources & Communities
School Transport - Additional ASN Costs 66 66 66 0
Free schools meals expansion April - August 293 293 166 127 Approx £15k required for
holiday provision Feb mid
term & exams
Free School Meals holiday provision 80 80 80 0
DSM / class contact time review 18 9 9 0 Employee finished position
early.
Libraries loss of income from Passport checking service no
longer available
26 26 26 0
Education
Additional Teachers  285 285 285 0
School roll numbers 700 344 344 0
ELC specific grant 190 190 190 0
5% increase in sustainable rate ELC partner providers 395 395 395 0
* Education Investment Fund - short term funding 500 500 241 259 No further funding required
this year but will need April
- August next year.
Additional Support Needs (ASN)
0 1,800 565 1,235 Should not require any
further funding this year
but will need April - August
next year.
Item 10.
Page 67

Page 68

APPENDIX 5
Economic Growth & Development
MGD revenue contribution STEM 3 3 3 0
Bus Revolution revenue 20 20 20 0
Development Plan Scheme - transportation appraisals 100 100 100 0
Economic Recovery Plan 53 0 0 0
Renewables Income Fund 5 0 0 0
Environmental & Commercial
Leachate - ongoing budget pressure 77 77 77 0
Mid Term Loadline Survey - Dredger 30 30 30 0
Fuel Costs - Waste 127 127 127 0
Brown bin permits 34 34 34 0
Deposit Return Scheme 30 0 0 0
* Road Safety matters 50 50 50 0
Additional Waste Crew 0 136 136 0
HR, ICT & Organisational Development
HR post - no compulsory redundancies Budget Pressure 0 40 42 (2)
Governance etc
Reduced admin funding from DWP for Housing Benefits 7 7 7 0
* Amount for each Ward (£15k) to address minor
works/concerns
120 120 120 0
Housing & Property Services
Homeless - higher costs of providing and maintaining
temporary accommodation for increased levels of homeless
presentations
220 220 220 0
Financial Services
Procurement (additional 0.5FTE Procurement Officer) 28 28 29 (1)
Other
* Donation to assist local effort for relief of suffering in
Turkey/Syria
5 5 0 5 Budget to be drawn down
* Donation to Moray Foodbank (in addition to 22/23 donation) 20 20 20 0
Page 68

Page 69

APPENDIX 5
Cross Service
Reinstatement of the Employee Assistance Programme 15 15 15 0
NDR revaluation 400 400 364 36 Not all NDR accounts
settled - there are disabled
reliefs to be reapplied.
Difficult to estimate
requirement until all of that
is resolved and bills paid
but right now suggest
remainder of the budget
will be required £36k.
TU Provision 11 0 0 0 Extra TU may now be
required for costs charged
to HR.
Increase in Loans Charges 2,000 2,000 2,000 0
Removal of Statutory Mitigation for Flexi/TOIL 0 0 173 (173)
Funding for MIJB
H&SC £100M RLW funding 1,882 1,882 1,882 0
H&SC PNC funding 328 328 328 0
Total 8,118 9,630 8,144 1,486
Funded from Transformation Earmarked Reserves
Revised IMP
Raising Attainment - TCH
1,302 706 714 (8) Funding will be required
for April to August next
financial year.
Raising Attainment - SJC 0 0 90 (90) as above
Total 1,302 706 804 (98)
Page 69

Page 70

APPENDIX 5
FUNDING FOR NEW DUTIES
FSM Expansion 1,204 1,204 0 1,204
Whole Family Wellbeing Fund (WFWF) 545 545 0 545 Unspent will be put to an
earmarked reserve at y/e
along with last years
£546k.
Empty Property Relief 508 508 508 0
Redeterminations
Summer Holiday activities funding 68 68 68 0
Employability Staffing Costs 23-24 264 264 264 0
Ukrainian Resettlement £30m funding allocation 331 331 0 331 Unspent will be put in
earmarked reserve at y/e
Ukrainian Resettlement addl £3.2m funding allocation 50 50 0 50 As above
Kinship & Foster Carers SRA funding 262 262 155 107
Self Directed Support Transformation funding - per f/c 8/23 6 6 0 6
Climate Intelligence Service - per f/c 8/23 -6 -6 0 (6)
Temporary Accommodation - per f/c 8/23 29 29 0 29
Educational Psychologists 9 9 0 9
NQT Funding to March 2024 0 1,635 1,440 195
SERVICE DEVELOPMENTS
Levelling Up Fund 221 221 44 177 Potential to spend in full if
Levelling up Round 3
application is to be submitted
School real time data 63 63 0 63 This will not be spent this
year
Youth work (Buckie and Forres) 120 120 120 0 Unspent will be put in
earmarked reserve at y/e
Roads patching - one year only 300 300 300 0
Total 3,974 5,609 2,899 2,710
Grand Total 13,394 15,945 11,847 4,098
* One year funding
Page 70

Page 71

APPENDIX 6
SAVINGS
Description Approved
Amount
Adjusted
Amount
Achieved Balance Status Committee
reference
Qtr 3
Reason for balance Savings likely to
be achieved? (Y
or N)
£000 £000 £000 £000
Approved when 2023/24 budget set:
Salt store (Keith depot) (35) 0 0 0
Roads maintenance - hire out machinery (100) (100) 0 (100) Saving moved to 24/25 N
EV / ULE salary sacrifice (20) (20) 0 (20) Saving moved to 24/25 N
Financial Services
Financial service restructuring (16) 0 0 0
Review of purchasing card (30) (30) 0 (30) Cross Service saving Y
Empty Property Relief (44) (44) (44) 0
Environmental & Commercial Services
3 weekly recycling collection (136) (136) (136) 0
Temp Bus Stop Charges (2) 0 0 0
Harbours commercial income (336) (336) (336) 0
TRO charges (16) (16) (16) 0
Transportation and Consultancy recharges (142) (142) (142) 0
Economic Growth and Development
Statutory fees for planning applications (110) (110) (110) 0
Local Housing Energy Efficiency Strategy (LHEES) (50) (50) (50) 0
Housing & Property Services
Closure of Quarryhill (28) (28) (28) 0
Cessation contract SACRO (150) (150) (142) (8)
Property Services admin (26) (26) (26) 0
Homelessness service charges (230) (230) (230) 0
Integrated Children's Services
Children's Services - adoption, temp HoS (54) (54) (54) 0
Item 10.
Page 71

Page 72

APPENDIX 6
Schools
Service concession (1,168) (1,168) 0 (1,168) Y
Education Resources and Communities
Relocate staff from Auchernack plus Forres
Community Centre staff restructure
(20) (20) 0 (20)
Saving moved to 24/25 N
ASN contracts: Home Tuition, Call Scotland, SALT (60) (60) (60) 0
Area Forums (4) (4) (4) 0
Corporate/Cross service
Charges review - See Charges Tab 0
Increase vacancy factor in line with pay awards (225) (225) (326) 101 Saving exceeded
budget
Governance, Strategy & Performance
Improvement & Modernisation Programme:
Stream 2: ICT & Digital - Schools Admin (56) 0 0 0
Stream 4: Review & Expansion of Flexible Working (44) (44) 0 (44) To be allocated Y
Care placements (245) (245) (245) 0
Reduction in reinvestment costs (18) (18) 0 (18)
LEAN review (125) 0 0 0
Customer Services CMP 0 (108) (108) 0 Corp 25/4/23
Temporary Savings
Corporate
Grampian Valuation Joint Board - Refund (50) (50) (46) (4) MC 8/3/23
Direct Services
Dallachy spare capacity - income (725) (200) (200) 0 MC 8/3/23
Income from Charges (150) (150) (136) (14) MC 8/3/23
Income approved since budget set
Planning fees & Building Warrant income 0 (45) (45) 0
Elgin Car Parking Review (wef 1/1/24) 0 (103) (103) 0 MC 27/9/23
Page 72

Page 73

APPENDIX 6
Savings approved since budget set:
IORB 0 (715) (715) 0 MC 28/6/23
Development Services - Software Licences 0 (11) (11) 0 MC 28/6/23
Members Allowances/Expenses 0 (20) (20) 0 MC 28/6/23
HR - Professional fees 0 (10) (10) 0 MC 28/6/23
Increase in recharges to CapitalHRA 0 (105) (105) 0 MC 28/6/23
Income 0 (219) (219) 0 MC 28/6/23
Janitorial Restructure 0 0 (2) 2
Savings on expenses - template F6-8 0 (29) (29) 0 MC 28/6/23
CPD Manager per savings template - taken early 0 (5) (5) 0
Scottish Water commission uplift 23/24 0 (50) (50) 0
Increase in Nursery Rental Income 0 (8) (8) 0
Crossroads PS - Mothballing 0 (122) (122) 0
Reverse Covid reduction in Leisure Income 0 (300) (300) 0
Match funding no longer required Building Financial resilience to shared prosperity fund0 0 (83) 83
Remove rent rebate to Keith Golf Club 0 0 (5) 5
EfW reduced gate fee (Electricity generation) 0 (150) (150) 0 MC 28/6/23
D1-2 School Catering Budget 0 (150) (150) 0
Catering - Dynamic Pricing 0 (6) (6) 0
Homelessness temp accom charges 0 (20) (20) 0 Hsg & Comm Safety 12/9/23
Homelessness - discount for block purchased temp accom0 (10) (10) 0
Homelessness - Allocate further 5 flats for homeless accom0 (5) (5) 0
Property - commercial approach to rent reviews 0 (50) (50) 0
Travel and Subsistence recurring savings - Smarter Working0 (50) (50) 0
Customer Service - printer contract 0 (12) (12) 0
LHEES saving 0 0 (53) 53 MC 8/3/23
Total Approved when budget set (4,380) (3,656) (2,331) (1,325)
Total Approved since budget set (2,303) (2,446) 143
Balance at Qtr 3 (1,182)
Page 73

Page 74

Page 74

Page 75

APPENDIX 7
General Reserves Committee
reference
Approved
£000s
Budget
released
£000s
General Reserves @ 1 April 2023 5,000
Free balance @ 31 Dec 2023 5,000
Transformation Ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 5,480
Funding from reserves approved in 2023/24:
Poverty MC 15/09/21 (66)
Raising Attainment MC 15/09/21 (1,547) (796)
Smarter Working MC 02/02/23 (76) (76)
(1,689) (872)
Free balance @ 31 Dec 2023 3,791
Covid Ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 22,897
Less commitments against reserves when
budget was set
(15,478)
Adjustments Qtr 1:
Increase use of reserve (4,249)
Decrease use of reserve 1,852
(2,397)
Adjustments Qtr 2:
Increase use of reserve (222)
Decrease use of reserve 2,337
2,115
Adjustments Qtr 3:
Increase use of reserve:
Qtr 2 monitoring adjust for Red category Savings MC 25/10/23 (822)
Additional Budget Pressure - HR Post MC 25/10/23 (40)
Adj budget pressure for school rolls transport costs (50)
Decrease use of reserve:
Variance Analysis additional savings MC 28/6/23 1,080
Increase Savings - Planning income MC 28/6/23 45
Additional Savings SMTFP MC 28/6/23 79
Item 10.
Page 75

Page 76

Energy from Waste reduced gate fee MC 28/6/23 150
SMTFP Savings MC 25/10/23 83
Savings Quarter 2 revenue monitoring MC 6/12/23 635
Homelessness service charges - part year 20
Qtr 2 remove Red BPs MC 6/12/23 378
Stream 2 - Customer Services CMP saving 108
SNCT pay agreement addl funding 596
SJC pay agreement addl funding - confirmed 3,316
5,578
Approved use of reserves (10,782)
Other Adjustments
Decrease use of reserve:
Capital element of pay award 22-24 2,381
Free balance @ 31 Dec 2023 14,496
Council Priorities ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 5,881
Free balance @ 31 Dec 2023 5,881
Moray Growth Deal CF Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 4,000
Less commitments against reserves when
budget was set:
MGD Cash Flow MC 01/03/23 -
Free balance @ 31 Dec 2023 4,000
Page 76

Page 77

REPORT TO: MORAY COUNCIL ON 6 MARCH 2024 
SUBJECT: CAPITAL PLAN 2023/24 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT and
FINANCE) 
1. REASON FOR REPORT 
1.1 To advise the Committee of capital expenditure to 31 December 2023 and of
updated estimates of projected expenditure under the capital plan for 2023/24
profiled into quarters. 
1.2 This report is submitted to Committee in terms of Section III (B) 9 of the
Council’s Administrative Scheme relating to monitoring progress of projects in
the approved capital plan including any revisions to the price or phasing on a
quarterly basis. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) Considers and notes expenditure to 31 December 2023 of
£15,841,000, which is £6 million less than estimated in detail at the
end of quarter 2; 
(ii) Considers and notes the current projected expenditure of
£25,178,000 for 2023/24, as set out in APPENDIX 1 in detail and as
adjusted at top level in paragraph 7.1 below; 
(iii) Considers and notes the projected overall expenditure for
projects spanning more than one financial year, as set out in
APPENDIX 2; and 
(iv) Approves amendments to the 2023/24 and 2024/25 capital plan as
detailed in section 6.1 of this report. 
3. BACKGROUND 
3.1 The capital plan for 2023/24 totalling £59,186,000 was approved by Moray
Council on 1 March 2023 (paragraph 4 of the Minute refers).  Amendments
approved by the Council at its meetings on 8 March 2023 (paragraph 7 of the
Minute refers), 28 June 2023 (paragraph 8 of the minute refers) and
Item 11.
Page 77

Page 78

6 December 2023 (paragraph x of the Minute refers), and at Corporate
Committee on 28 August 2023 (paragraph 7 of the minute refers) have been
implemented.  The budgets for Moray Growth Deal (MGD) projects have been
adjusted to reflect change requests approved by Scottish and UK
Governments and Full Business Case (FBC) submissions, with a further
adjustment to reflect delays in FBC submission as approved by MGD
Programme Board.  The result of these amendments is a total capital plan for
2023/24 of £40,943,000.   
3.2 As some sizeable projects span more than one financial year, this report
includes a separate APPENDIX 2, giving details of expenditure on such
projects in order to give a complete financial overview of these major projects. 
4 CAPITAL PLAN 2023/24 
4.1 A copy of the summary capital plan is included as APPENDIX 1 showing
actual expenditure to 31 December 2023 of £15,841,000. This is just under
40% of the currently approved Capital Plan.  General Capital Grant of
£9,555,000 has been received from the Scottish Government. Other grants
and contributions of £868,000 have also been received, of which £203,000 is
to support Moray Growth Deal.  Capital receipts of £826,000 for the sale of
land and buildings and vehicles have been generated during 2023/24 to date. 
The Council previously took advantage of flexibilities allowed by the Scottish
Government that allowed the Council to use capital receipts to fund spend on
Transformation projects. This flexibility ended in 2022/23 and unused receipts
of £4,331,000 were transferred to the Useable Capital Receipts Reserve and
will be used in 2023/24 to fund capital expenditure.  In addition to this,
Developer Contributions of £603,000 have been received in this financial year
to date.  Developer contributions of £124,000 are planned to be used in
2023/24. 
4.2 Expenditure on land and buildings to 31 December 2023 totals £5,394,000.
The main items of expenditure are £1,281,000 on the schools BB programme,
including £368,000 on RAAC remediation at Forres Academy and £1,439,000
on the NESS Energy from Waste plant. 
4.3 Expenditure on infrastructure assets to 31 December 2023 totals £7,136,000.
The main items of expenditure were £3,089,000 on road improvements and
£1,295,000 on various harbours projects. 
4.4 Expenditure on vehicles, plant and equipment to 31 December 2023 totals
£2,592,000. The main item of expenditure was £1,987,000 on the Vehicle and
Plant Replacement Programme. 
5 PROJECTED OUTTURN 
5.1 Projects are graded for confidence of achieving projected expenditure with
high confidence rated as green, medium confidence as amber and low
confidence as red. This RAG rating is used as the basis of a high-level
adjustment of the detailed out-turn projections in APPENDIX 1.  A summary of
the ratings is given in the table below. 
Page 78

Page 79

Risk Status RAG No of
Projects
Budgeted
Expenditure
2023/24   
£000
High confidence of spend to estimate G 104 60,363
Medium confidence of spend to estimate A 4 5,686      
116 66,049 
5.2 Red rating
A red status highlights areas where there is low level of confidence in
estimated expenditure.  At this late stage in the year there are no projects
rated as having low confidence in estimated expenditure. 
5.3 Amber rating
An amber rating of confidence to spend budget highlights areas where there
are issues impacting on the ability to project spend – generally indicating
factors outwith the budget manager’s control. The following have been
identified by budget managers as having an amber status:   
Project Para. Capital Plan
2023/24 
£000s
Projected
Expenditure
2023/24
£000s
Land and Buildings   
NESS Energy for Waste Plant 5.6 5,304 5,304
ELC - Portgordon 5.7 110 110
Infrastructure   
Bridges (1 projects) 5.7 38 38
Vehicles, Plant and Equipment   
Children’s Play Area Equipment 5.8 234       262      4
TOTAL  5,686 5,714 
5.6 Spend on the Council’s share of the costs of the construction phase of the
NESS Energy for Waste Plant is dependent on the contractors achieving
agreed milestones which trigger payments and may be subject to change.
This is the last year of construction and the plant is now operational. 
However, under the terms of the agreement the primary supplier is permitted
to claim for exceptional costs associated with a delay outwith their control. 
The Project Board, representing the Local Authorities’ interests, is in
commercial negotiations as to the value of this claim. Until these negotiations
progress to a later stage it is not possible to quantify any liability. 
5.7 Work required at the Early Learning and Childcare (ELC) facility at Portgordon
by the Care Inspectorate were put on hold until the final accounts were
received for the ELC facility at Aberlour, to determine affordability.  .  Final
accounts have now been agreed and the Portgordon works will be carried out
in 2024/25, at an estimated cost of £50,000.  Carry forward will be requested. 
The final underspend in 2023/24 remains uncertain until Property Services
fees for quarters 3 and 4 are charged.   
Page 79

Page 80

5.8 Expenditure on the planned project at Lea Bridge in Forres is dependent on
the findings of inspections. 
5.8 Expenditure on children’s play areas is dependent on delivery times for
equipment and remains uncertain, with long delivery times experienced. 
5.9 Details of the projected variances as at December 2023 from the current
approved capital programme, summarised in APPENDIX 1, are set out below: 
Description Ref Underspend/
(Overspend)
£000s
Land and Buildings  
Early Learning and Childcare (ELC Projects) 5.10 138
Moycroft 5.11 96
Industrial Estates 5.12 69
Infrastructure  
Flood Risk Management 5.13 (180)
Harbours 5.14 35
Vehicles, Plant and Equipment  
Orchard Road Signals 5.15 (45)
Moray Leisure Centre 5.16 103
Moray Growth Deal 5.17 
TOTAL  843 
Land and Buildings
5.10 Early Learning and Childcare (ELC) Projects – Tenders for various ELC
projects have seen both increased prices and lack of supplier engagement. 
The final account for the ELC project in Aberlour has come in underbudget. 
Some other projects are forecast to be overspent due to higher tender prices,
with an overall underspend of £138,000 forecast, subject to finalising Property
Services fees.   
5.11 Moycroft –  This project was complete in November 2020.  As discussions
with the contractor to agree the amount of the final bill were in train in
2022/23, an estimate of the amount was made and accrued. The final bill
agreed is less than this estimate, resulting in an underspend of £96,000. 
5.12 Industrial Estates – There has been slippage in the programme of
refurbishment of industrial units, due to delays in agreeing works with tenants
and in securing contractors.  Upgrades to roads in industrial estates has
slipped because of delays in finalising the specification of work required.  It is
recommended that the projected underspend of £69,000 is carried forward
into 2024/25. 
Infrastructure
5.13 Flood Risk Management – Compensation negotiations for the Findhorn
Flood Alleviation Scheme are ongoing and officers are working with the
District Valuer, landowners and their agents to try and reach agreement.
There is an element of uncertainty in how much these compensation
payments will be agreed and this has resulted in an overspend this year.
Page 80

Page 81

There are still three agreements outstanding on the Findhorn Scheme and it is
hoped that these will be settled before the end of 2024. However, one of
these agreements is subject to potential legal action, which increases the
uncertainty over cost and timing. 
5.14 Harbours – Various Harbour works are forecast to be underspend overall by
a total of £35,000. 
Vehicles, Plant and Equipment
5.15 Orchard Road Signals – As reported at the end of quarter 2, late invoices
totalling £45,000 for the installation of signals equipment were received. 
5.16 Moray Leisure Centre – a contingency of £103,000 had been held in the
capital budget in case of mechanical or electrical failure.  At this late stage in
the year expenditure is not considered to be likely within 2023/24.  It is
recommended that this underspend along with the previously reported
projected underspend of £700,000 on Moray Leisure under Land and
Buildings is carried forward into 2024/25. 
Moray Growth Deal
5.17 Elements of slippage are anticipated across the Growth Deal Projects: 
£67,000 on the Bus Revolution; £112,000 on Early Years STEM; £225,000 on
Housing Mix Delivery; and £272,000 on the Cultural Quarter with an
overspend of £52,000 anticipated on the Manufacturing Innovation Centre.  All
are due to slippage and reprofiling of the spend is recommended. 
6. AMENDMENTS TO CAPITAL PLAN 
6.1 The following amendments to the capital plan are recommended:  
Amendments Para  2023/24
£000s
2024/25
£000s
Industrial Estates 5.12 (69) 69
Moray Leisure Centre 5.16 (803) 803
Moray Growth Deal 5.17 (624) 624    
TOTAL  (1,496) 1,496 
7. ESTIMATED OUT-TURN 
7.1 Budget managers project expenditure for the year based on a review of
individual projects.  However, past experience suggests that at the
aggregate level this is not always an accurate estimate of overall levels of
expenditure and this has been particularly so during the past few years with
many uncertainties in tendering and supply lines making accurate budget
forecasting extremely difficult.  Consequently the detailed estimated outturn
from budget managers has been revised to reflect aggregate levels of
slippage based on expenditure to date and on levels of expenditure in the
last two financial years (£31 million in 2021/22 and £28 million in 2022/23) . 
£000
Projected Spend notified per departments 40,094
Page 81

Page 82

Amend for slippage on Amber projects (50%) (2,843)
Amend for slippage on Green projects (20%) (12,073)
Revised Estimated Out-turn 25,178 
7.2 This compares with an adjusted estimated out-turn reported at the end of
quarter 2 of £29,901,000, a reduction of £4,654,000.  As noted in paragraph
2.1, spend for quarter 3 is £6 million less than previously estimated. 
However, improved delivery times for replacement vehicles are now forecast
to result in expenditure in quarter 4 of £1,756,000 higher than forecast as at
the end of September, so the estimate in paragraph 7.1 is consistent with the
previous forecast adjusted for expenditure during quarter 3.   
8. RISK 
8.1 Budget managers have been asked to identify any specific areas of risk for
the projects in the capital plan for which they are responsible. 
Generic risks
8.2 Projects can be subject to risks which are outwith the direct control of the
Council, such as poor weather conditions.  Some assets such as harbours are
particularly vulnerable to bad weather events but there is potential for weather
conditions to impact across all lands and buildings and infrastructure projects. 
8.3 Lack of staff resources and staff turnover can impact on project timescales
and other emerging work priorities can impact in scheduled works and this is
reflected in delays where work planned to be out-sourced is being brought in-
house as a result of poor response to tender requests. 
8.4 There is a risk that time-limited funding is not spent within time-frame and that
the Council therefore loses the opportunity to improve or create assets at no
or reduced cost to the Council. 
8.5 There is a risk that contract inflation might increase the eventual cost of
projects in future years of the capital plan and a risk that any deferment of
projects relating to asset condition might result in element failure, potentially
incurring unbudgeted costs. The figures in the 10 year plan are based on
current costs and are likely to increase by the time the project is undertaken.   
8.6  A risk to the capital plan in recent years has been an increase in the cost of
materials and scarcity of many materials which are key for the construction
industry. This was partly a world-wide reaction to the pandemic, and partly
due to Brexit, but global conflicts are increasing having an impact. 
8.7 The cost to the Council of borrowing is based on current interest rates.
Inflation is stabilising and falling, but interest rates appear likely to stay at
around the current level for some time, although forecasts have been volatile
with a number of factors bearing on the Bank of England 
Project specific
8.8 The Climate Change Route Map to Net Zero, setting out how the Council
plans to achieve its target of net zero carbon by 2030, has not been
incorporated into the capital plan.  As projects in the plan are developed
Page 82

Page 83

carbon factors will be taken into account.  The impact will be increased costs
for many projects.  Where specific actions in the Route Map entail capital
expenditure these will be included in the capital plan, subject to a business
case being approved for the inclusion of the action. 
8.9 The main current risk for the vehicle replacement programme  arises from
pressures due to targets for local authorities to de-carbonise their fleets,
which also entails developing the infrastructure to support electric vehicles. 
8.10 The Council’s Learning Estate is generally of a poor condition and this carries
the risk of unplanned work being required to avoid unplanned school closures.   
8.11 No other project risks have been specifically identified by budget managers. 
There are risks relating to Moray Growth Deal projects which are monitored
by the MGD Programme Board – these will be added to the risks reported on
the Council’s Capital Plan as and when Full Business Cases are approved
and projects led by partners go live. 
9. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Effective budget management is an essential component of delivery of
Council priorities on a sustainable basis. 
The capital plan is one of the vehicles through which the Council’s
priorities can be delivered. The approved capital plan for 2023/24 and
the outline ten year plan incorporates measures designed to address the
LOIP priorities of building a better future for our children and young
people, empowering and connecting communities and developing a
diverse, inclusive and sustainable economy. 
(b) Policy and Legal
There are no policy or legal implications arising directly from this report. 
(c) Financial implications
The financial implications are highlighted within the report and
Appendices 1 and 2 to the report. 
(d) Risk Implications
Budget managers are aware of their responsibilities for managing budget
allocations and approval for variance will be sought from Council in line
with the financial regulations. Risks specific to items within the capital
plan are highlighted in paragraph 7 of this report. 
(e) Staffing Implications
There are no staffing implications arising directly from this report 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
Page 83

Page 84

There are no equalities issues arising from this report. 
(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity issues arising directly from
this report.  Achieving net zero will have significant implications for future
planned capital expenditure 
(i) Consultations
Capital budget managers and all Heads of Service have been consulted
and any comments incorporated in the report. 
10. CONCLUSION 
10.1 Capital expenditure for 2023/24 amounts to £15,841,000 to the end of
December 2023. 
10.2 Capital expenditure for 2023/24 is currently projected to be £25,178,000
but with a high degree of uncertainty due to current construction
industry conditions and other external factors. 
10.3 Amendments to the Capital Plan amounting to a decrease of £1,496,000
in 2023/24 and an increase of £1,496,000 in 2024/25 are recommended. 
Author of Report: Lorraine Paisey, Chief Financial Officer
Background Papers: 
Ref: SPMAN-1293228629-1055 
Page 84

Page 85

APPENDIX 1
Moray Council Capital Programme 2023/24       
As at 31 December 2023       
Projected Expenditure 
Capital Plan
2023/24 Actual Q1 Q2 Q3 Q4
Total Projected
Expenditure 
£000 £000 £000 £000 £000 £000 £000
Land and Buildings       
Education, Children's and Leisure Services
Committee 8,045 2,609 18 814 2,424 2,754 6,010
Economic Development and Infrastructure Committee 11,963 2,757 71 1,550 2,555 7,622 11,798
Corporate Committee 79 20 1 6 0 72 79
Infrastructure       
Economic Development and Infrastructure Committee 11,777 7,140 736 2,197 5,252 3,555 11,650
Vehicles Plant and Equipment       
Education, Children's and Leisure Services
Committee 202 54 14 32 76 80 202
Economic Development and Infrastructure Committee 6,547 2,215 1,263 688 1,146 3,159 6,256
Corporate Committee 723 323 29 211 259 224 723
Moray Growth Deal 26,713 721 257 355 710 1,851 3,376         
66,049 15,841 2,389 5,853 12,422 19,317 40,094    
Funding       
Prudential Borrowing 47,448 137     24,217
General Capital Grant (exc PSHG and CYPA) 8,789 9,555     8,789
Moray Growth Deal 9,532 203     1,211
Other Grants & Contributions 0 665     665
Developers Contributions 124 124     124
Useable capital recipts b/f  4,331     4,331
Receipts generated in year 156 826     826 
66,049 15,841     40,163 
Item 11.
Page 85

Page 86

Page 86

Page 87

Major Capital Projects spanning more than 1 financial year (as at 31 December 2023) APPENDIX 2
Description Approved
Total
Budget
Total
Expenditure
in previous
financial
years
Current
Budget
2023-24
Actual
spend
2023-24
Remaining
Budget
2023-24
Project
Life Spend
to 31/03/24
Projected
Future
Years
Budget
Required
Estimated
Final Cost
Projected
Variance
£000 £000 £000 £000 £000 £000 £000 £000 £000
NESS Energy from Waste 27,224 22,092 5,304 1,439 3,865 23,359 27,224 0
Moray Growth Deal
Bus Revolution 4,000 480 681 222 459 702 2,839 4,000 0
Early Years STEM 4,800 0 200 8 192 8 4,600 4,800 0
Housing Mix Delivery 7,500 77 900 352 548 429 6,523 7,500 0
Cultural Quarter 23,802 42 903 132 771 174 22,857 23,802 0
Digital Health 5,000 2,391 597 407 190 2,798 2,012 5,000 0
Business Enterprise Hub 5,268 0 295 295 0 4,973 5,268 0
Moray Aerospace, Advanced
Technology and Innovation
Campus
27,035 0 0 0 0 27,035 27,035 0
Manufacturing Innovation Centre 6,832 0 151 151 0 6,681 6,832 0
Total 111,461 25,082 9,031 2,560 6,471 27,470 77,520 111,461 0
Item 11.
Page 87

Page 88

Page 88

Page 89

REPORT TO: MORAY COUNCIL ON 6 MARCH 2024 
SUBJECT: CHARGING FOR SERVICES 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To ask Council to approve revised charges for Council services for 2024/25. 
1.2 This report is submitted to Council in terms of Section III (B) (1) and (48) of
the Council's Scheme of Administration relating to financial policy and the
setting of charges. 
2. RECOMMENDATION 
2.1  It is recommended that Committee approves the charges for Council
services for 2024/25 set out in paragraphs  3.3 to 3.4. 
3. BACKGROUND 
3.1 The current Charging for Services Policy was approved by Council on
12 December 2023 (paragraph 7 of the draft Minute refers). Under the policy,
an annual revision of charges is required.  In order to preserve the Council’s
financial position, charges within the control of this council are generally
inflated annually and Council at the same meeting agreed that the default
increase for 2024/25 would be 5.7%. 
3.2 When charges for 202/25 were approved by Council on 24 Janaury 2024
(paragraph 8 of the minute refers) it was noted that two charges remained to
be considered: Fit Life and burial grounds.  Charges for Fit Life are dealt with
in paragraph 3.4 of this report, with burial grounds charges anticipated to be
reported to Cuncil on 27 March 2024.  In addition a new charge for Citizenship
Ceremonies is proposed, in paragraph 3.3. 
3.3 A: Corporate / Cross Departmental
A16 A – Citizenship ceremonies 
Citizenship Ceremonies are held monthly by the Registration Service at no
cost to the individuals.  Increasingly the Service is being asked to hold
individual ceremonies outwith the monthly date.  There were 7 individual
ceremonies in 2023.  This is mainly due to individual travel reasons. 
Item 12.
Page 89

Page 90

The Senior Registrar surveyed other Local Authorities in Scotland and of
those who responded the majority advised that they charge for carrying out
individual Citizenship Ceremonies, with the charges ranging from £20 to £185
per ceremony.  It is proposed that the Council start charging £75 for each
individual ceremony requested, however if it is an individual ceremony for a
couple or a family the charge would still be £75. 
3.4 C: Leisure facilities
- C1 – Fit Life.  Discussions have taken place with Moray Leisure Ltd on
increase of charges for Fit Life.  The charges below are recommended as
acceptable to Moray Leisure Ltd, thus allowing the current integrated Fit
Life scheme to continue.  However, a futher review of charges may be
recommended as part of the review of Leisure and Libraries services
which will be reported to members when concluded.  
C1  Current charge Proposed
charge
2024/25 
C1a
.
C1b
.
Membership cards
Individual – 12 months
Individual – monthly direct
debit 
Family (1 adult) – 12 months
Family (1 adult) – monthly
direct debit 
Family (2 adults) – 12 months
Family (2 adults) – monthly
direct debit 
£276
£23 
£360
£30 
£384
£32 
£288
£24 
£384
£32 
£408
£34 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
The levying of charges for Council services is an essential component of
delivering Council priorities on a sustainable basis. 
(b) Policy and Legal
The current policy for charging for Council services was approved by this
Council on 25 October 2023.  There are no legal implications arising
from this report.  Some charges are set or limited by legislation. 
(c) Financial implications
Increased income from charges will contribute to the Council’s financial
sustainability. 
(d) Risk Implications
There are no risk implications arising directly from this report.  
Page 90

Page 91

(e) Staffing Implications
There are no staffing implications arising directly from this report.   
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
There are no equalities implications or implications for the socio-
economic duty arising from  this report.    Proposed Fit Life charges are
still at a very low level compared to other fitness schemes.  A link to the
Integrated Impact Assessment is provided: IIA Fit Life 
(h) Climate Change and Biodiversity Impacts
There are no implications for climate change or biodiversity arising from
this report. 
(i) Consultations
All services have been consulted as to recommended charges and
reasons for any departures from the default increase. 
5. CONCLUSION 
5.1 Two proposed charges are itemised above. 
Author of Report: Lorraine Paisey, Chief Financial Officer
Background Papers: 
Ref: SPMAN-1293228629-1053
Page 91

Page 92

Page 92

Page 93

REPORT TO: MORAY COUNCIL ON 6 MARCH 2024 
SUBJECT: TELFORD BRIDGE, CRAIGELLACHIE 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To inform Council of the condition of Telford Bridge and what options are
available for its future operation. 
1.2 This report is submitted to Council in terms of paragraph II (20) of the
Scheme of Administration relating to matters which currently do not fall within
the terms of reference of any Committee. 
2. RECOMMENDATION 
2.1 It is recommended that Council:- 
(i) notes the ownership, condition and maintenance responsibilities
relating to the Telford Bridge as set out in the report; 
(ii) agrees that the Council’s future responsibilities are as set out in
para 7.2 – 7.5; and 
(iii) agrees that should there be sufficient interest from an external
group that the Council would further explore the options set out in
paras 7.6-7.10 subject to its reasonable costs being covered by a
third party. 
3. BACKGROUND 
3.1 This report has been prepared in response to the Notice of Motion to the
meeting of Moray Council on 27 September 2023, regarding Telford Bridge,
Craigellachie – Ownership and Future Development (para 8 of the minute
refers).  The Notice of Motion is provided in Appendix A. 
3.2 Telford Bridge was constructed in 1812 by Thomas Telford to provide a
crossing over the River Spey at Craigellachie.  In 1972 this bridge was
replaced by the New Craigellachie Bridge, which carries the A941 over the
River Spey.  Since 1972 Telford Bridge has remained open to pedestrians
and cyclists only.
Item 13.
Page 93

Page 94

3.3 Given the absence of clear ownership, views on what is required to maintain
the bridge are complex and it may be helpful to considered in two contexts:
a) the bridge as a structure which has an adopted public road passing over it
and the council’s responsibility as roads authority; and b) the bridge as a
historic local landmark and where responsibilities lie in this regard.   
3.4 The council has a role as roads authority and the majority of the report is
written in that context, in terms of the rights and obligations on the council. 
3.5 The bridge is an iconic and historic local landmark, however, the council has
no specific responsibilities for the structure in that regard, as it does not own
the structure and does not have a duty to preserve the bridge as a landmark.
The latter part of this report tries to recognise the bridge in this context and
set out options whereby those with legitimate interests in preserving it as a
landmark may be able to take action. 
3.6 Interest in leasing the bridge under the CAT process, to raise funds and
refurbish the bridge was expressed by a local charity, Friends of
Craigellachie Bridge.  However, this interest was withdrawn in May 2022. 
4. CONDITION OF THE STRUCTURE 
4.1 A Principal Inspection of the bridge was carried out in 2014.  This inspection
found that the bridge was not considered dangerous.  However, the paint
system on the bridge has failed, which will increase the rate of deterioration if
refurbishment work is not undertaken.   
4.2 The Friends of Craigellachie Bridge undertook a drone survey of the bridge
in 2022, the conclusion and recommendation of which were that an
additional in person survey is required. 
4.3 A General Inspection was undertaken by the Council in 2023.  The findings
of this inspection are that maintenance works required are low to medium
priority.     
4.4 To fully assess the current condition of the bridge would require a Principal
Inspection and a Structural Assessment to be undertaken.  The Structural
Assessment would provide details of the bridge condition and any works
required.  The cost of the Principal Inspection and Structural Assessment
would be in the region of £30,000. 
4.5 Council Officers met with Friends of Craigellachie Bridge and at this meeting
the group indicated that they are willing to carry out a survey of the bridge
and officers have provided information to enable this to happen. 
5. OWNERSHIP 
5.1 Ownership of the bridge is not known.  At the time of construction half of the
funds came from the government and the other half from subscriptions.  To
establish ownership a full title investigation would need to be undertaken,
which would require a significant amount of work from the Council’s Legal
Page 94

Page 95

Services Section.  This section is currently under resourced and it is unlikely
it would be able to undertake this work in the foreseeable future.  This work
could be outsourced but significant input would still be required by Legal
Services. There is no budget identified for such costs in the council’s
revenue budget.  It should be noted even a full title investigation may be
unable to identify the bridge owner.   
6. MAINTENANCE RESPONSIBILITIES 
6.1 While Telford Bridge is no longer used for road traffic, it is still on the
Council’s List of Public Roads (LOPR), listed U150H.  Although the Council
does not own the bridge, it has sufficient powers to enable it to undertake
maintenance works to the bridge such as it considers necessary in order to
fulfil its duty to maintain the road (i.e. the road carried by the bridge).  As
such, Moray Council has no need to take ownership of the bridge. 
6.2 As set out above, whilst there are low to medium priority works identified in
the General Inspection in 2023. As this bridge is closed to vehicular traffic
and an alternative route is provided by the new Craigellachie Bridge, it does
not meet the criteria necessary to be prioritised for maintenance works under
the council’s Bridge Maintenance Prioritisation Policy. Consequently, there
are currently no maintenance works allowed for this bridge in the Council’s
Revenue or Capital budgets. 
7. FUTURE OPTIONS 
7.1 Potential options for the future ownership / leasing of the bridge are provided
below. 
7.2 Status Quo – this option recognises the existing rights and obligations of the
Council, whereby the Council retains responsibility for all future maintenance
of the road carried by the bridge, in line with its current statutory duty, and
relies upon its statutory powers in terms of any future maintenance
requirement for the bridge structure itself.   
7.3 As this bridge does not meet the criteria necessary to be prioritised for
maintenance works under the council’s Bridge Maintenance Prioritisation
Policy it would not be put forward for significant maintenance and
refurbishment works. This will result in a managed decline of the bridge with
eventual closure and possible demolition (and associated stopping up of the
right of passage for pedestrians and cyclists).  The Council has a duty under
the Buildings (Scotland) Act 2003 to ensure public safety and as the owners
of the bridge cannot be identified, it may be required to undertake demolition
of the bridge at its own cost.  This is no different to other buildings or
structures in the Moray area, for which the council may need to assume
responsibility if ownership cannot be established and the structure is no
longer safe. 
7.4 As stated in paragraph 4.1, the paint system on the bridge has failed which
will increase the rate at which the bridge condition will deteriorate.  If works
are not undertaken to address the condition of the bridge it is likely it will
need to be closed to all users at some point in the future and eventually
demolished.  The cost of demolition will depend on environmental constraints
Page 95

Page 96

and market conditions when the works are required, however, it is likely to be
in excess of £1,000,000. 
7.5 Whilst a de-listing or stopping up order could be pursued to remove
maintenance obligations, given the absence of clear ownership and the
current deteriorating condition of the bridge, the legal advice given to officers
is that this may not relieve the council of all obligations, not least any duties
under the Buildings (Scotland) Act 2003 mentioned above. 
7.6 The following options are identified to recognise the interests in preserving
the bridge as a historic landmark. 
7.7 Community Asset Transfer – the Community Empowerment Act gives
community groups a right to ask to take  over control of Council assets. 
They can ask to buy or lease an asset or for the transfer of other rights, such
as might be included in a management agreement or other similar
arrangement.  However, before the Council could agree to any form of asset
transfer arrangement, it would first need to acquire the necessary property
rights.  Property rights could be acquired under Compulsory Purchase
Legislation (CPO).  The cost of progressing a CPO would depend on the
amount of work required but a similar process was undertaken in 2022 at a
cost of approximately £23,000, including VAT.  This cost is for an external
solicitor only and does not allow for officer time required to manage the
contract or gather and collate the information required.  This indicative cost
would not cover the costs of any detailed title investigation.  The costs could
also be higher if any parties objected to any proposed CPO.  It is
recommended that if this option is pursued, that it is clear that the costs to
the Council of undertaking a CPO (and any associated activity) are required
to be third party funded, and that any additional liabilities to the council are
understood and agreed prior to any decision to CPO. 
7.8 Purchase / Lease from owner – theoretically, a group interested in
refurbishing the bridge could approach the owner of the bridge and negotiate
the purchase or lease that would allow them to undertake this work.  The
owner of the bridge is currently unknown and would need to be identified if
this option was to be progressed. Whilst it is recognised that this could be a
complex undertaking, the actions and costs associated with direct purchase /
lease would be for any interested group to consider. 
7.9 Other funding routes - It may be possible, under certain circumstances, for
an interested party to provide funding to the council for works to the bridge.
Whether this could be done within the current position around ownership, or
whether the council would need to have established ownership through CPO
would need further exploration. If this was a route to be pursued then further
advice would be taken. 
7.10 If a group were to take ownership, management or control of the bridge,
consideration would need to be given by the Council as to whether it
remained appropriate for the right of passage for pedestrians and cyclists to
be maintained as adopted road with a continuing duty for maintenance of
that road or if the road should be either de-listed or otherwise stopped up.  
Page 96

Page 97

8. FRIENDS OF CRAIGELLACHIE BRIDGE 
8.1 The Friends of Craigellachie Bridge was established as a SCIO (Scottish
Charitable Incorporated Organisation) in April 2016 with the object of
promoting, preserving and conserving Craigellachie Bridge.  Initially, the
charity approached the Council with a view to leasing the bridge through the
CAT Scheme.  However, following advice from the Community Ownership
Support Service (COSS), they withdrew that interest.  Nevertheless, they are
interested in options that may enable them to take an active role in
preserving the bridge for the future. Council officers will continue to engage
with them, or other groups with similar interests. 
9. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Building a better future for our children and young people in Moray. 
(b) Policy and Legal
The Council does not own the bridge but it has statutory powers to
enable it to undertake maintenance works to the bridge such as it
considers necessary in order to fulfil its duty to maintain the road (i.e.
the road carried by the bridge). 
(c) Financial implications
The costs associated with Principal Inspection, Structural Assessment
and maintenance are not currently included in the council’s revenue or
capital budget.  If the council decides to fund any of these works this
would result in unplanned expenditure. 
At the time of writing this report, it was proposed at its meeting on
28 February 2024 that the Council would balance its budget by using
reserves and one-off financial flexibilities. The indicative 3 year budget
showed a likely requirement to continue to make savings in the order of
£13.5 million in the next two years.  All financial decisions must be
made in this context and only essential additional expenditure should
be agreed in the course of the year.  In making this determination the
committee should consider whether the financial risk to the Council of
incurring additional expenditure outweighs the risk to the Council of not
incurring that expenditure, as set out in the risk section. 
(d) Risk Implications
The Council does not own the bridge but it has statutory powers to ena-
ble it to undertake maintenance works to the bridge such as it considers
necessary in order to fulfil its duty to maintain the road (i.e. the road
carried by the bridge).     
(e) Staffing Implications
If Members decide to facilitate a CAT or other transfer to a local group
to enable them to refurbish the bridge it would first have to acquire the
necessary property rights. The bulk of the legal work required to acquire
these rights would be outsourced to the Council’s framework solicitors,
Page 97

Page 98

however, legal services would be required to gather and collate all rele-
vant information and manage the contract with the framework solicitors. 
(f) Property
The Council does not own the bridge but it has statutory powers to ena-
ble it to undertake maintenance works to the bridge such as it considers
necessary in order to fulfil its duty to maintain the road (i.e. the road
carried by the bridge). 
(g) Equalities/Socio Economic Impact
There are no equalities implications related to the recommendations in
this report because they do not affect groups of people in different
ways. 
(h) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Environmental and Commercial Services, the Legal Services
Manager, Asset Management Coordinator, Chief Financial Officer,
Committee Services Officer (T Sutherland) and the Equal Opportunities
Officer have been consulted and comments have been taken into
account. 
10. CONCLUSION 
10.1 Telford Bridge is considered an iconic structure and a significant 
tourist attraction for Moray. 
10.2 The current condition of the bridge is very poor.  The bridge is closed
to vehicular traffic but open to cyclists and pedestrians.  The bridge
does not meet the criteria necessary to be prioritised for maintenance
works under the Council’s Bridge Maintenance Prioritisation Policy.  As
such, there are currently no maintenance works allowed for this bridge
in the Council’s Revenue or Capital budgets. 
10.3 The Council does not own the bridge but it has statutory powers to 
enable it to undertake maintenance works to the bridge such as it 
considers necessary in order to fulfil its duty to maintain the road (i.e.
the road carried by the bridge). 
10.4 If Moray Council decides to facilitate a CAT or management agreement,
to enable an outside organisation to take on the refurbishment of the
bridge, it will first have to acquire the necessary property rights, but
that would bring with it a clearer duty on the part of the Council to
maintain the bridge structure. 
Author of Report: Debbie Halliday, Consultancy Manager 
Ref: SPMAN-524642768-1044
Page 98

Page 99

NOTICE OF MOTION TO MORAY COUNCIL ON WEDNESDAY 27
SEPTEMBER 2023 
Telford Bridge, Craigellachie - Ownership and Future Development 
Background 
The Telford Bridge in Craigellachie is a world-renowned engineering structure
conceived and designed by Thomas Telford and constructed between 1812 and
1814 following a large public fundraising exercise.    
The bridge has been recognised as a landmark of importance by both the American
Society of Civil Engineers and the Institution of Civil Engineers.    
The bridge is currently used as a footbridge over the Spey and is a popular landmark
for visitors and locals alike in Speyside. Many visitors come to Moray Speyside
specifically to see this historic structure.    
The local community, including the Friends of Craigellachie Bridge, have expressed
concern over the condition of the bridge and how future maintenance of this historic
site can be assured.    
Friends of Craigellachie Bridge commissioned an inspection report in 2022, which
identified structural repairs that required to be carried out over the coming years. The
Friends of Craigellachie Bridge have been established for ten years and have been
involved in fundraising, awareness raising, and seeking to establish ownership of the
bridge in order to identify a means of maintaining and preserving the bridge for
current and future generations to enjoy. There is a pressing need to have a full
condition assessment carried out on the bridge. 
As a historic monument, future ownership and management of the bridge by
charitable organisations, such as a Community Development Trust, a Community
Benefit Company or an organisation such as Historic Scotland could provide a
possible alternative route to funding major preservation and interpretation works
relating to the bridge. 
Actions 
Council notes the historical significance of the Telford Bridge, Craigellachie and the
aspirations of the community with regard to its future preservation. 
Council instructs officers to bring forward a report to Council covering the following
matters: 
• The known condition of the bridge 
Item 13.
Page 99

Page 100

• What further inspection work may be required to ascertain fully the 
maintenance requirements and associated costs 
• Current ownership and maintenance responsibilities for the bridge including 
whether a CPO may be required to define clear ownership 
• Other future ownership/leasing options that could be considered    
Financial Implications 
A report would require officer time but could also generate options that would reduce
future council involvement whilst securing the long-term future of the bridge as a
major historical asset to Moray Speyside. 
Proposer: Councillor Juli Harris 
Seconder: Councillor Derek Ross 
Date Motion Submitted: 13 September 2023
Page 100

Page 101

REPORT TO: MORAY COUNCIL ON 6 MARCH 2024 
SUBJECT: MORAY GROWTH DEAL ANNUAL REPORT 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To provide a draft copy of the Moray Growth Deal’s 2023 annual report for
consideration by Councillors.   
1.2 This report is submitted to Council in terms of Section (II) (20) of the Council’s
Scheme of Administration relating to a new policy matter which does not fall
within the terms of reference of any Committee. 
2. RECOMMENDATION 
2.1 It is recommended that the Council: 
(i) consider and note the draft annual report; and 
(ii) delegate authority to the Depute Chief Executive (Economy,
Environment and Finance) to approve a final iteration of the
report, following engagement with key stakeholders and the
Scottish and UK Governments.  This will then be submitted to a
future Moray Council meeting for noting.   
3. BACKGROUND 
3.1 A condition associated with Growth Deal funding is that a report is produced
annually providing an overview of work undertaken in the past 12 months, with
a forward look at the year ahead.   
3.2 In March (paragraph 13 of the minute) and May 2023 (paragraph 17) reports
were submitted to Council related to the report that covered 21 December
2021 (when the Deal was signed) to 31 December 2022.  This paper
introduces a draft annual report for the 2023 calendar year.   
Item 14.
Page 101

Page 102

4. STEPS ASSOCIATED WITH DEVELOPING A FINAL DRAFT OF THE
ANNUAL REPORT 
4.1 During January 2023 the Moray Growth Deal Programme Management Office
(PMO) prepared a first draft of the annual report using information provided
from Project Senior Responsible Officers (SROs) and Project Managers
(PMs).  This draft was presented to the Moray Growth Deal Board on 25
January 2024, with Board Members invited to provide comments.  The version
accompanying this report (Appendix 1) incorporates comments received.   
4.2 The annual report forms the basis of the Deal’s Annual Conversation, which is
scheduled to take place on 14 March 2024.  This is an opportunity for Senior
Officers from the Council and both Governments to discuss the status of the
Deal.   
4.3 The report will also be shared with the Moray Economic Partnership and the
Growth Deal Business Assembly, with a final version due to be submitted to
the Moray Growth Deal Board in April for approval before submission to
Council for noting.   
5. OVERVIEW OF THE ANNUAL REPORT (v0.3)
.  
5.1 Appendix 1 contains a draft copy of the Moray Growth Deal’s 2023 annual
report.   
5.2 The Growth Deal started 2023 with one of the eight projects in delivery, Digital
Health.  Bus Revolution received clearance to commence in March 2023, with
a further 3 projects gaining approval from the Moray Growth Deal Programme
Board for their full business cases in the second half of the year (with these
expected to receive final clearances to enter delivery during late Q4 23/24
following approval by the Moray Council on 24 January 2024):  Business
Enterprise Hub (subject to confirmation of philanthropic contribution), Housing
Mix Delivery and Manufacturing Innovation Centre for Moray (MICM) 
5.3 Alongside the progression of full business cases, a number of key milestones
were achieved during 2023.   
Q4 22/23 ▪ Bus Revolution project receives Council and Government clearance
to enter delivery.
Q1 23/24 ▪ Digital Health’s Demonstration, Simulation and Environment (DSE)
Space opens in UHI-Moray, providing a location for residents,
digital developers and health care professionals to collaborate on
healthcare digital applications.
▪ Fraser Livingstone Architects appointed to design phase 1 of the
Dallas Dhu (Forres) housing masterplan
▪ Enhanced on demand bus services take to the road, rebranded as
m.connect.
Q2 23/24 ▪ Moray Growth Deal Board approves full business cases for the
Business Enterprise Hub, Housing Mix Delivery and MICM projects,
enabling them to move to the next stage of scrutiny by Government
Policy Advisors and the Moray Council.  
▪ Bus Revolution project receives a Ministerial Launch in Aberlour.
Page 102

Page 103

Q3 23/24 ▪ LDN architects appointed as lead design partner for the
redevelopment of Elgin Town Hall as part of the Cultural Quarter
project.
▪ Drop in event held regarding regeneration plans for South Street in
Elgin, which involves the Business Enterprise Hub and Housing Mix
Delivery projects. 
5.4 Looking ahead to 2024, the pace of activity will continue to increase, with the
investment and associated services becoming more visible to residents and
businesses of the region. 
Q4 23/24 ▪ 5 of the Deal’s 8 projects to have entered delivery.
▪ Planning application for the Business Enterprise Hub on South
Street to be submitted.  
▪ Planning applications for Housing Mix Delivery South Street and
Dallas Dhu developments to be submitted.
▪ Design team for Grant Lodge to be appointed.  
Q1 24/25 ▪ Expansion of Bus Revolution to include a pilot of weekend services.  
▪ Early Years STEM and Cultural Quarter projects to have submitted
their full business cases to the Growth Deal Board, with the aim that
they enter delivery during Q2 24/25.  
Q2 24/25 ▪ Launch of EY STEM outreach offer
▪ Following a delay procuring consultancy support to assist with
drafting of the Deal’s Benefit Realisation and Monitoring Plan, this
work is expected to conclude by Q2 24/25.  
Q3 24/25 ▪ Phase 1 of the Manufacturing Innovation Centre for Moray (MICM)
will open in autumn 2024 at the Forres Enterprise Park. 
▪ (In the assumption planning permission is secured) Construction of
the Business Enterprise Hub facility to commence.   
5.5 Whilst positive progress continues to be made, the Deal is currently managing
a number of risks and issues.  The most significant strategic entries are noted
below.   
- Changes to capital and revenue costs:  As project FBCs are developed,
Project Managers are adapting to a range of circumstances such as cost
inflation from OBC profiles and changing financial conditions within the
partners who are both delivering projects and contributing funding.  A range
of measures will be considered including value engineering construction
plans to reduce cost, whilst working to prevent any change in the benefits
to be realised and identifying alternative sources of funding.   
- Staff resources available to deliver Bus Revolution:  With increased
resources required for key roles, including bus drivers and vehicle
technicians, there is a risk that recruitment does not keep up with the
numbers needed.  This has the potential to slow down the pace of
expansion and/or affect the operational model of the project.  Efforts are
being made to make recruitment an ongoing rather than cyclical activity and
analysis of the constraints is to be carried out with a view to determining
what is within the Council’s control to achieve improved outcomes.   
Page 103

Page 104

- Workload of key stakeholders:  With a significant number of Growth Deal
projects due to scale up during 2024, this has the potential to create
demands on a finite number of key stakeholders, some of whom will have
interests in multiple projects.  Stakeholder identification and mapping will be
carried out, with co-ordinated communications and engagement plans to be
developed across the programme and projects to ensure any peaks of
activity for particular groups are effectively managed. 
5.6 Alongside risks and issues, Moray is faced with a positive opportunity that the
Growth Deal and wider Economic Development Team are working to exploit. 
During the second half of 2023 the Council received further economic
investment in the form of £18.3m from the Levelling Up Fund and £20m from
the Long Term Plan for Towns Fund.  Work will be delivered during Q4 23/24
to understand the milestones, linkages and resourcing requirements across
the three funding programmes and these will then be managed through
appropriate governance structures with a view to maximising the benefits to
be realised for Moray.   
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Moray Growth Deal projects contribute to the Corporate Plan priority of
promoting economic development and growth, whilst meeting the LOIP
vision of raising aspirations, reducing inequalities in educational
attainment, providing access to employment, expanding choices for
residents, and improving livelihood and well-being.   
(b) Policy and Legal
Each MGD project has been developed to meet local, regional and
national policy agendas in line with legal requirements where relevant.   
(c) Financial implications
The production of the 2023 Moray Growth Deal annual report in itself
does not present any financial implications, but it does contain a section
relating to the finances of the programme.     
With an increasing number of projects either in delivery or in the
advanced stages of developing their full business cases, it is expected
that during the first half of 24/25 there will be more certainty around the
financial profile for the remaining 7 years of the Deal.  This in turn will
allow Finance to understand cash flow requirements that the Council
have committed to cover about the Government funding profile. 
Specifically, it will determine application of the £4m currently held in
reserves.   
The Council’s Head of Financial Services sits on the monthly Moray
Growth Deal Programme Board at which a report is submitted for review
setting out spend against budget allocation and takes an overview of the
financial implications of the Deal for the Council as s95 Officer.   
Page 104

Page 105

(d) Risk Implications
The production of the 2023 Moray Growth Deal annual report in itself
does not present any risk implications, but it does reference risks being
managed by the Moray Growth Deal SRO and PMO that have the
potential to affect successful delivery.   
Risk is a standing item at monthly Moray Growth Deal Programme
Boards and is covered in meetings that the PMO has with each Project
Manager.   
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
Equalities and socio impact assessments for each project will be
updated as part of full business case development and any subsequent,
significant change control activity.   
(h) Climate Change and Biodiversity Impacts
As part of their review process with the Governments, Growth Deal
projects need to take account of carbon and environmental
considerations in full business cases, with net zero aspirations being
integrated into design briefs for new properties. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance),
Head of Economic Growth and Development, the Legal Services
Manager, the Equal Opportunities Officer the Chief Financial Officer and
Democratic Services Manager have been consulted and comments
received have been incorporated into the report.   
In parallel with the above, a final version of the annual report will be
prepared following extensive consultation and review with: 
- Moray Growth Deal Programme Board
- Moray Economic Partnership (MEP)
- Moray Growth Deal Business Assembly
- The Scottish and UK Governments 
A final version of the annual report will be provided to Council for noting
at its meeting on 22 May 2024.   
7. CONCLUSION 
7.1 This paper provides a draft copy of the Moray Growth Deal’s 2023 
annual report for the Council to review and comment upon.   
Page 105

Page 106

7.2 The Council is asked to delegate authority for the Depute Chief
Executive (Economy, Environment and Finance) to approve a final
iteration of the report.   
7.3 A final draft of the annual report will be provided to the Council for
noting once engagement with Key stakeholders including the Scottish
and UK Governments has concluded.   
Author of Report:  Michael Kelly, Moray Growth Deal Programme Manager 
Background Papers: 
1 Full Deal documentation (December 2021)
2 Approval of procurement requirements prior to the Housing Mix Delivery FBC
being approved
3 Acquisition of property relating to South Street redevelopment activity (relating
to both the Housing Mix Delivery and Business Enterprise Hub projects)
4 Moray Growth Deal 21/22 annual report
8 March 2023 and 24 May 2023
5 Approval of MICM  FBC
6 Approval of Business Enterprise Hub and Housing Mix Delivery FBCs 
Ref: SPMAN-813460984-481
Page 106

Page 107

1 
Annual Report (covering the 2023 calendar year)
Version 0.3 (February 2024) 
Item 14.
Page 107

Page 108

2 
Document control
Version Date Individuals / groups consulted
v0.1 17.01.24 Initial draft circulated for review:
- Rhona Gunn (Depute Chief Executive Economy, Environment and Finance)
- Jim Grant (Head of Economic Growth and Development 
- Lynne Owen (MGD Programme Officer)
v0.2 22/01/2024 Draft circulated to members of the Moray Growth Deal Board for comment
v0.3 14/02/2024 Revised draft prepared following feedback from the MGD Board 
Page 108

Page 109

3 
Contents
1 Headline achievements  4
2 Statement from Moray Council’s Growth Deal Lead 5 
3
3.1 
3.2
Progress made throughout 2023 
Programme overview 
3.1.1     Summary of what the Deal is working to achieve
3.1.2     Status of Deal activity
3.1.3     Anticipated geographical spread of benefits
3.1.4     Synergies between Growth Deal activity and other   
economic development funding secured for Moray 
Project updates 
3.2.1 Bus Revolution
3.2.2 Business Enterprise Hub
3.2.3 Cultural Quarter
3.2.4 Digital Health
3.2.5 Early Years STEM
3.2.6 Housing Mix Delivery
3.2.7 MAATIC
3.2.8 MICM 
6
6
7
8
9
13
16
19
23
26
29
31 
4
4.1
4.2
4.3
4.4 
Forward look at activity planned for 2024 
Work to get all Growth Deal projects into delivery
PMO milestones to be achieved
Factors that require action or future delivery could be impacted
Monitoring the benefits to be realised by the Deal 
34
34
35
35 
5
5.1
5.2 
Financial summary 
Funding sources for Deal activity
Funding drawn down from the Scottish and UK Governments Q4
22/23 to Q3 23/24 
37
37 
6 2023 communications activity  38
7
7.1
7.2
7.3
Programme structure and governance activity 
Structure of Moray Growth Deal activity and Officers involved 
Summary of assurance activity progressed during 2023
Audit activity undertaken during 2023 
40
41
42 
Page 109

Page 110

4 
1. Headline achievements 
Q4 22/23 ▪ Bus Revolution project receives Council and Government clearance to enter
delivery. 
Q1 23/24 ▪ Digital Health’s Demonstration, Simulation and Environment (DSE) Space
opens in UHI-Moray, providing a location for residents, digital developers and
health care professionals to collaborate on healthcare digital applications.
▪ Fraser Livingstone Architects appointed to design phase 1 of the Dallas Dhu
(Forres) housing masterplan.
▪ Enhanced on demand bus services take to the road, rebranded as m.connect. 
Q2 23/24 ▪ Moray Growth Deal Board approves full business cases for the Business
Enterprise Hub, Housing Mix Delivery and MICM projects, enabling them to
move to the next stage of scrutiny by Government Policy Advisors and Moray
Council.  
▪ Bus Revolution project receives a Ministerial Launch in Aberlour. 
Q3 23/24 ▪ LDN architects appointed as lead design partner for the redevelopment of
Elgin Town Hall as part of the Cultural Quarter project.
▪ Drop-in event held regarding regeneration plans for South Street in Elgin,
which involves the Business Enterprise Hub and Housing Mix Delivery
projects.   
Page 110

Page 111

5 
2. Statement from Moray Council’s Growth Deal Lea
Throughout 2023 I’ve seen first hand the significant amount of work being delivered by Council
Officers and partner organisations to progress the Growth Deal. In briefing sessions with fellow
Members, MGD Board meetings and in conversations with key officers, I’m excited to see plans start
to crystalise for the facilities and services we’re working hard to put in place.
The Growth Deal is focusing on key improvements we need to see in Moray, including generating
high value skills, growing businesses, driving innovation and making Moray a better place to work,
live and visit.
The launch in May 2023 of the enhanced, rebranded m.connect Bus Revolution on demand public
transport service presented the first opportunity for many to see how the Deal will help residents
and businesses. We’re humbled by the response seen so far as passenger numbers currently exceed
our targets.  This project is critical if we are to achieve our objective  of reducing transport barriers to
work, education and leisure. 
Our ‘on the ground’ activity will grow significantly during 2024 and I look forward to the opening of
the Manufacturing Innovation Centre for Moray (MICM) Hub at the Forres Enterprise Park next
autumn in what will be our first direct intervention for businesses.  
The target is that at least seven of the eight projects will enter delivery during 2024.  This presents a
solid foundation to start tracking the benefits Growth Deal activity will deliver for Moray.  It will also
be important that the team considers how activity interacts with other funding programmes we’ve
been successful in securing during 2023 (£18.3m from the Levelling Up Fund and £20m from the
Long Term Plan for Towns Fund), with a view to minimising risks and maximising opportunities to
enhance benefits wherever possible.   
Cllr Marc Macrae 
Page 111

Page 112

6 
3. Progress made throughout 2023 
3.1 Programme overview
3.1.1     Summary of what the Deal is working to achieve
Throughout 2023 the Growth Deal Programme Management Office (PMO) worked with each of the
eight Project Managers to ensure activity aligns with the four main interventions the programme
aims to deliver:  
- Retaining and attracting young people / families (16-29 yrs) to live and work in the area
- Addressing occupational segregation and gender inequality in employment, including the
significant gender pay gap and under-employment issues for women
- The creation of new high quality jobs in existing sectors and diversify the region’s economy
into new high value areas
- The creation of opportunities across Moray which help secure the future prosperity of its
many communities
A later section of this report will focus on work being progressed to deliver a Benefits Realisation and
Monitoring Plan, with the following outcomes expected to be delivered for the region:
Direct and indirect creation of
over 3,500 jobs
450 of the 3,500 jobs will result
directly from Growth Deal
projects
50,000 more tourists will be
attracted to Moray
Over 300 new affordable homes
will be constructed
450 businesses will be supported
to scale, increasing Moray’s
economic productivity  by £82m
Creation of new and improved
educational, cultural and business
innovation facilities 
A very distilled view of the Deal is that the eight main projects are working to make interventions
against three main areas of focus:  
Generate high value skills Create high value employment Make Moray a better place to
live and work
MAATIC  Bus Revolution
MICM Cultural Quarter
Business Enterprise Hub Housing Mix Delivery
EY STEM  Digital Health 
3.1.2  Status of Deal activity
With the Scottish and UK Governments each providing funding of  £32.5m over a 10 year period,
Deal activity will be delivered in a phased approach up to December 2031.  That said, the PMO is
working with project teams to create clarity on what each project will deliver for Moray during 2024 ,
with a view to:
▪ Defining what the Deal is going to deliver when, where and how.
▪ Maximise time over the 10 year funding period to make sure work runs as efficiently as
possible to limit expenditure peaks over and above Government funding, which the Council
committed to when the full deal was agreed in December 2021.   
Page 112

Page 113

7 
A high level summary of the status of each project is outlined below:  
High level phases of the lifecycle of projects:
SOC 
→
OBC 
→
FBC 
→
Delivery 
→
Closure
Strategic
outline case 
Outline
business case 
Full business
case
Project in
delivery
Project 
complete and
being closed 
Project Lifecycle stage
SOC OBC FBC Delivery Closure
Bus Revolution  Complete Complete Complete In delivery 
Business Enterprise
(BE) Hub
Complete Complete Awaiting approval  
Cultural Quarter Complete Complete Approval expected
Q2 24/25  
Digital Health  Complete Complete Complete In delivery 
Early Years (EY) STEM Complete Complete Approval expected
Q2 24/25  
Housing Mix Delivery Complete Complete Approval expected
Q4 23/24  
MAATIC Complete Complete In development  
MICM Complete Complete Approval expected
Q4 23/24   
3.1.3 Anticipated geographical spread of benefits
As each project works to either draft their full business case or advances delivery activity, a clearer
picture is emerging on the geographical spread of Deal activity throughout Moray.  The completion of
project monitoring plans and a Benefits Realisation Plan during 2024 will provide finer detail but
activity has been grouped into one of two main categories:
Infrastructure (physical or virtual)
with a Moray-wide footprint
▪ Virtual healthcare applications are being developed
through the Digital Health project that aim to enable
conditions to be managed at home, reducing time spent
in clinical settings.  
▪ On demand m.connect services will be expanded
throughout Moray on a phased basis, breaking down
barriers to accessing employment education or leisure.
▪ Through a combination of physical hubs, a mobile solution
and outreach activity, STEM learning targeting early years
children will be available Moray wide.
▪ Comprising of two phases that will run up to 2031,
Housing Mix Delivery will enable the construction of
affordable and private homes throughout Moray, making
it easier to access homes to help people stay in the region. 
Page 113

Page 114

8 
Moray-wide service offerings to
be established, operated from a
centralised facility
▪ Support to drive growth and innovation in the
manufacturing sector through the MICM project that will
create a hub at the Forres Enterprise Park.
▪ The construction of a Business Enterprise Hub on South
Street in Elgin will help micro and small businesses to
grow as well as offering a variety of education and
professional learning opportunities.
▪ An aerospace and advanced technology campus will be
developed to support learning as well as R&D
opportunities not just for residents of Moray, but wider
afield.   
3.1.4  Synergies between the Growth Deal and other economic development activity being
progressed within Moray
The Growth Deal Team is conscious that to create the right environment for success, alongside
managing interactions between projects, activity being progressed by other economic development
programmes needs to be considered. This is not only to ensure they have no negative impact on
Growth Deal objectives and benefits to be realised, but that any positive opportunities to drive
efficiency or to create stronger benefits are maximised wherever possible.
At a strategic level, the Moray Growth Deal Programme Board includes representatives from the
Scottish and UK Governments, along with the Council’s Economic Development Team and Highlands
and Islands Enterprise. Collaboration will be essential in understanding the funding landscape and to
manage any potential interactions other activity has with Growth Deal activity.
Operationally, the Growth Deal PMO is working to generate clarity on how funding secured for
Moray during 2023 (£18.3m from the Levelling Up Fund and £20m from the Long Term Plan for
Towns Fund) interacts with planned activity, including the impact on council staff resources, the
organisations / companies needed to support the work and the nature of communications planned
with key stakeholders including businesses and residents.   
Page 114

Page 115

9 
3.2 Project updates
3.2.1 Bus Revolution
3.2.1 Bus Revolution
Value £4.32m (£4m capital, £322k revenue) 
Lead Body The Moray Council
Current status Entered delivery in March 2023, with the first rebranded
m.connect on demand services starting in May 2023.  
Project vision  Increase the number of people using public transport to
get to and from rural areas for work, education and
leisure. 
Project summary
Bus Revolution is an innovative project that aims to increase the number of people using public transport to
get to and from rural areas to places of work, education and leisure, providing a step change in availability
of public transport right across rural Moray. 
The project will provide a flexible demand responsive service, operating when and where needed in an
easy-to-use way, utilising app-based technology that will allow journeys to be booked up to one hour before
they’re needed.   
Bus Revolution will receive £4.3m in funding from the Scottish Government. This will be used to cover the
capital investment required to: 
- Set-up operational systems
- Provide branding and marketing.
- Purchase electric vehicles 
- Provide associated charging infrastructure to deliver an efficient and robust transport network. 
Headline achievements
Since the approval of the Full Business Case in March 2023, the main focus of activity during 2023 has been
delivering phase one of the project plan starting in Q1 23/24. Activity completed to date has included the: 
▪ Implementation of a real time booking and management system (Op Porta, Driver app)
▪ Introducing new operating zone & fares models
▪ Upgrading electronic ticketing machines (ETM)
▪ Re-branding vehicles
▪ Creating a service website
▪ Production of key policy documents supporting the service
▪ Development and execution of a marketing and communications campaign 
The first phase of m.connect service enhancements introduced the following additional service provision: 
▪ Timetabled service (309) linking Cullen-Buckie-Keith to the rail network (0515-2030hrs Mon-Fri)
Page 115

Page 116

10 
▪ Enhanced timetable for service 366, linking Aberlour-Archiestown-Elgin (0900-030hrs Mon-Fri)
▪ m.connect on-demand extended operating hours in Buckie, Keith and Speyside (0630-2030hrs Mon-
Fri) 
To date, m.connect has shown strong growth, gaining more than 5,000 additional passengers from the same
period in 2022. There has also been a shift in how the service is booked, with almost one third of bookings
now being made via the m.connect passenger app. To date over 2,000 downloads of the app have been
registered through both Google Play and the Apple App Store. 
On 28 August 2023, The Scottish Government’s Cabinet Secretary for Wellbeing Economy, Fair Work and
Energy, Neil Gray MSP, officially launched the m.connect service at Speyside High School. A month later,
m.connect was nominated for Scottish Council for Development & Industry (SCDI, now rebranded to
‘Prosper’) Highlands & Islands Business Excellence Award for Innovation, where the service was awarded
second place.   
Key milestones 
Milestone Due Date
Vehicle & Charge Unit Procurement  Q1 24/25 
m.connect pilot of weekend services  Q1 24/25 
47364 51650
24320 29833
0
20000
40000
60000
2022-23 2023-24
m.connect Passenger figures
17047
7488
Booking Booking Method Method
Booking Requests by Telephone Booking requests by App
--  2022-23 -Total Annual Passengers 23-24 Total Passenger target 
2022-23 & 2023-24 – Total passengers carried to date (May-January)
A booking request can cover multiple bookings that influence the volume of
passengers and journeys. Does not include any email bookings through lagan. 
Page 116

Page 117

11 
Risks, issues and opportunities that require management by the project team during 2024 
Impact Mitigation
Risk: Actual performance varies
negatively from assumptions
built into the full business case
(passenger numbers, fare
income etc). 
If performance is not as hoped,
the Council’s revenue
commitment may need to
increase to support the service
and capital return on investment
calculation may become less
favourable.   
Early performance has been
strong and the project is being
proactive in monitoring
performance data. Project in-life
reviews will take a detailed look
at data, providing an opportunity
to review the service model or
future vision to ensure it remains
aligned with capital and revenue
budget allocations. 
Risk: Recruitment ofstaff (drivers
and vehicle technicians) could
prevent or limit service
expansion plans.  
Potential for capacity issues to
run services, if drivers are not
recruited in sufficient numbers,
and maintain vehicles or the cost
increases as the work needs to
be carried out externally.  
Continuous advertising of
positions, analysing data from
different stages of the process to
better understand and mitigate
challenges faced. The Team will
also work to minimise staff
turnover.   
Focus on…efficiency through analysis 
One of the major benefits of the new booking and management system supporting m.connect, is access to a
range of reporting tools that inform service optimisation recommendations. The recommendations aim to
improve service efficiency by monitoring: 
1. Who travels and when (known as ridership).
2. The current demand profile by hour of the day (The balance of supply and demand), Inc passenger
per vehicle hour metrics (PpVH).
3. Ride sharing and vehicle utilisation. 
4. Trip requests by location, success rates and area specific influencers affecting booking success,
such as service zone restrictions, vehicle allocation within area and service / driver break periods. 
Optimisation sessions are then conducted with the operations team to discuss improvements in service
delivery, but also highlight potential deteriorations in other service metrics. These sessions occur every 3
months, allowing suitable monitoring of changes to evidence their impact on the operation.  To date, these
sessions have improved ride sharing on the service from 42% to 65%, generating an additional 23% seating
capacity to accommodate more journeys.   
By way of insight, data from Forres exhibits high demand and has shown considerable unmet demand. In
order to meet this demand, recommendations included: 
1. Modification of vehicle availability, i.e. extending Vehicle 2’s operating hours to match/be similar to
Vehicle 1. Unaccepted rides are mainly falling in the period with only 1 vehicle operating.
2. Adding an additional vehicle would be beneficial in Forres, improving access to the service. 
Page 117

Page 118

12 
Using the evidence that is being gathered, the team are looking to enhance the service offering further,
with key areas of focus including:
1. Private service functions:  The ability to add a bespoke route within the operation to accommodate
specific needs including education, health & social care, sports groups, after school clubs.
2. Group booking function:  Enabling social groups to request services that involve one request for a
trip to a common destination but with multiple collections and drop offs.
3. Integrated ticketing:  Fares validated on both on-demand and timetable services. 
Matched Bookings within requested time window
Cancelled Bookings by customer.
Rejected booking by customer (alternative offered if
initial booking can’t be matched)
Rejected booking by service (demand exceeding
capacity).
Page 118

Page 119

13 
3.2.2 Business Enterprise (BE) Hub 
Value £6.3m (£4.3m capital, £2m revenue) 
Lead Body University of Highlands and Islands, Moray
College
Current
status
The full business case has been developed
and final clearances to enter delivery will be
sought once the recently identified revenue
shortfall has been addressed
Project
vision 
Provision of education, research, and business
support functions to support new business
start-ups, whilst helping to upscale existing
micro businesses. 
Project summary
A key characteristic of Moray is that it has over 3,000 small and medium sized enterprises. This represents a
considerable growth potential if these businesses can be helped to scale-up. Supporting the upskilling and
growth of these businesses, the Business Enterprise Hub (BE Hub) will be a flexible space for business
innovation that is accessible to businesses and students alike, providing an inspirational environment that
encourages entrepreneurial thinking. Funding for the facility will be provided by the Scottish Government
(£3.3m) and Highlands and Islands Enterprise (£1m), with the Scottish Government also provided £2m in
revenue tosupport service delivery.    
It will be a productive environment where learning spaces and real work environments coincide, where
flexibility of usage allows students, lecturers, researchers, and practitioners to share the same space, and
where business support functions can be located with teaching and research skills to develop and support
Moray’s future entrepreneurs and their workforce.  
There are synergies between the BE Hub and other Growth Deal projects including Moray Aerospace,
Advanced Technology, and Innovation Campus (MAATIC) and the Manufacturing Innovation Centre for Moray
(MICM). Collaboration is ongoing to understand the target audience for each facility and any potential for
overlap to ensure they’re effectively managed.  
Headline achievements 
▪ RIBA stage 2 continued through Spring 2023, technical design elements of RIBA stage 3 were included
such as electricity and Wi-Fi cabling, plumbing etc. RIBA stage 3 officially launched in November and is
ongoing into January/ February 2024.
▪ MAATIC, MICM and the BE Hub have developed a clear synergies document that will be shared in the
appendices of each FBC.
▪ The Full Business Case (FBC) was developed throughout the year and has been approved by the MGD
Programme Board and the Moray Council.  Final  clearances from the Governments and the UHI Board
will be progressed once the recently identified revenue shortfall has been resolved.  
▪ Briefing and consultation sessions have been held with Moray Councillors, UHI Moray staff, Moray
Business Assembly, all positively received with clear demand.
▪ The BE hub forms part of the South Street regeneration project, designs have been exhibited at a public
engagement session on 16 December 23 which attracted over 600 visitors.
▪ Memorandum of Understanding signed with Moray Council in December. 
Key milestones
To progress the aims of the project, the following key milestones are identified for 2024.  These include
milestones for the construction of the facility as well as the Hub’s service offering. 
Milestone Due Date
Full Business Case approved Q4 23/24 / Q1 24/25
Initial site survey/ exploration Q4 23/24
Page 119

Page 120

14 
RIBA Stage 3+ Design Complete Q4 23/24
RIBA Stage 3 Design Cost Plan  Q4 23/24
Planning Application Q4 23/24
RIBA Stage 3 + Tendered Cost  Q4 23/24
BE hub brand development to start Q4 23/24
RIBA Stage 4 Design Commences Q4 23/24
Accredited course proposals/research and
innovation programme further developed 
Throughout 2024, but concluding in Q3 24/25
Planning Approval Q1 24/25
RIBA Stage 4 Design Complete  Q1 24/25
RIBA Stage 4 Costs  Q2 24/25
Construction commences Q3 24/25 
In the expectation that FBC and planning permission approval stages proceed as planned, construction will
start in October 2024 and last for approximately 18 months. The Hub “working” model is under development
to enable a smooth transition upon building opening/launch with plans in 2024 to develop the BE hub brand.
In the background regular project board and stakeholder meetings are ongoing to support the development
of the Hub function. 
Risks and issues that require management by the project team during 2024 
Effects Mitigation
Risk: Escalation of build costs  Work to rescope the facility
has already taken place to
ensure it is delivered within
the budget allocation.   
A fixed price contract is in
place to prevent cost over
runs. 
Cost mitigationthrough design
specification and realisation of
efficiencies due to co-location with a
Housing Mix Delivery site. 
Issue:  Revenue shortfall
identified 
Further work required before
the FBC can continue it’s
assurance journey.
The revenue funding model is being
reviewed with a view to lowering the
amount required without impacting
the service or quality.  Alternative
revenue solutions are also being
explored.
Risk: Potential site issues e.g.,
ground works and protection /
integration of existing
heritage (as yet unknown) 
Could result in delays to
construction activity or the
need to revise the vision for
the site, both of which could
affect time, quality, and cost
project parameters.
Detailed site survey work to be
progressed as soon as possible. 
Contingency integrated into the
budget to offset any potential issues
identified. 
Area of focus….emerging RIBA stage 2 design vision for the facility 
RIBA Stage 2 was the focus for the first part of the year, feeding into the development of the FBC. Monthly
meetings working through design versions were held between UHI Moray, Oberlanders (architects),
Robertsons, and Moray Council (design images included below). 
The size of building from the original plan has been reduced by one-third to fit the present value of the fixed
capital funding allocated, design was critical to ensure the maximisation of space available. Reducing the size
does not disadvantage the project, with the change accommodated by adjusting the need from full co-
location of public agencies to the hybrid working model now represented in the project. Through developing
Page 120

Page 121

15 
the designs for RIBA stage 2 costs estimates were prepared to demonstrate the financial sustainability of the
BE hub project.   
The location of the BE hub will be on South Street in Elgin and will form part of the South Street regeneration
project. Over three floors, the hub will be where the Junners Toy Shop previously was. Having a
conservationist architect within the team has ensured the building will incorporate some of the original
features, such as the scalloped top, as shown in the image below of the front exterior. The glass frontage is
important to ensure the building becomes a hub in it’s true sense, welcoming and apparent from the exterior. 
The hub will have a high profile in the town centre as it’s sited near the main UHI Moray campus and the city
centre with an aim to make engagement accessible. The hub will provide an inspirational environment,
externally and internally and one that really encourages entrepreneurial thinking. 
The BE hub will form part of a multi-building site shared with the MGD Housing Mix project. The image above
reflects the proposed back exterior to the BE hub including the public realm space, shared with the Housing
Mix project, and developed by Moray Council. The back exterior of the hub, also depicting a glass frontage,
with the aim again to make engagement activity clearly visible and encouraging. 
Page 121

Page 122

16 
3.2.3 Cultural Quarter
Value £32.3m (£31.6m capital, £700k  revenue) 
Lead Body The Moray Council
Current status Working to submit project Full Business Case to the MGD
Board in late Q4 23/24 with a view to entering delivery
by Q2 24/25
Project vision  Investment in key local assets, including the
refurbishment of Grant Lodge, the Town Hall, and
investment in the region’s tourism infrastructure
designed to leverage in private sector investment in a
new hotel.   
Project summary
The Cultural Quarter project is working to advance the development of inspirational, accessible, public
facing cultural attractions in the centre of Elgin. Significant investment is in place from four partners: 
- Scottish Government £12.7m
- UK Government £3.5m (towards Grant Lodge)
- Moray Council £3.9m
- Highlands and Islands Enterprise £2m 
Funding will be used to redevelop two important B listed historic buildings in Elgin: Elgin Town Hall (Phase
One) and Grant Lodge (Phase Two). Combined, these phases of activity will provide an enhanced cultural
offering which increases city centre activities day and night, and highlights the region as an inspirational
destination of choice. 
Each element will be linked together by improved public spaces and physical connections, creating a vibrant
space in the heart of Elgin which supports inclusive economic growth and cultural expansion within the city
and wider region. Collectively they’ll help to attract and retain talent whilst increasing tourism region wide.
Working with key stakeholders throughout Moray, these vibrant new spaces will act as a springboard for
cultural place-based regeneration, providing opportunities for local people and visitors alike whilst
supporting the creative, heritage and tourism sectors in Moray to collaborate, thrive and grow. 
The creation of modern fit for purpose venues and a visible, aspirational cultural centre in Elgin will
encourage private sector investment in a new hotel at a complementary site (Phase Three), meeting a
longstanding requirement for additional, quality, hotel accommodation in Moray. 
Headline achievements
▪ Cultural Quarter development workshops and Moray culture & heritage mapping study complete
(working with 60+ regional and sectoral partners).
▪ Specialist economic and cultural consultants EKOS and Creative Services Scotland appointed to update
Business Plans for Elgin Town Hall and Grant Lodge, review options for a CQ governance model /
operating organisation and update the project impact assessment.
▪ Cultural Quarter phasing and delivery plan RIBA stage 2 report complete. This  presented proposals for
how external sites and spaces can be improved and connected to lay the foundations for a successful
Cultural Quarter with clear links to the High Street.
▪ Full fabric condition survey completed for Grant Lodge, including recommendations for conservation
standard safeguarding/enabling works and costs.
▪ LDN Architects appointed as lead consultant in multi-disciplinary design team to progress the plans for a
transformed Elgin Town Hall. 
Page 122

Page 123

17 
Key milestones 
Milestone Due Date
Updated business plans, operational models, and Impact assessment for CQ
venues 
Q4 23/24
Capital and transitional programme for Elgin Town Hall confirmed Q4 23/24
Full Business Case submitted to MGD Programme Board  Q4 23/24
Grant Lodge design team and cost consultants appointed. Q4 23/24
Elgin Town Hall RIBA stage 2 complete Q4 23/24
Elgin Town Hall works tendered, with updated annex prepared for governance
that adds to detail contained within the FBC
Q3 24/25
Elgin Town Hall Works start on site Q2 25/26
Grant Lodge works tendered, with updated annex prepared for governance that
adds to detail contained within the FBC
Q3 25/26
Elgin Town Hall works complete Q4 26/27
Grant Lodge works complete TBC - 2027 
Risks and issues that require management by the project team during 2024 
Effects Mitigation
Risk: Inflation in
construction costs
means buildings exceed
budget allocation.
Impact on
deliverability of the
project which could in
turn affect outcomes
and benefits.
- Careful planning to ensure designs deliver
objectives
- Pursue all additional funding routes
- Appoint client-side cost consultant and
construction support through HUB North
- Engage with contractors early, regular review
Risk: The project does
not have sufficient
resources to manage
both the complex capital
redevelopment
programme and
associated business and
relationship
development required.
Lack of resources leads
to project delays with
operational/business
impacts, inability to
appoint the correct
professional services
leads to capital
programme delays and
cost increases which
may affect ability to
deliver full vision.
- Planning to ensure experienced input for each
project strand understood
- Early and continual engagement with key
relevant sectors
- Attractive and well-developed briefs which
highlight profile and benefits of the CQ
- Engagement with Hub North
- Continual re-assessment of programme risk and
interdependencies across internal and external
teams
- Share info and learn from other MGD projects.
Risk: The project is
working to ensure Elgin
Town Hall for the
Community has options
that enable it to operate
whilst redevelopment
work takes place, but
any delays could impact
their community and
contractual
relationships.
Any impact to the
sustainability of the
charity could
negatively affect the
project’s ability to
deliver full project
outcome and benefits.
- Sub-group of the Cultural Quarter Project Board
established to oversee transitional
arrangements
- Capital programme to be appraised against
Elgin Town Hall programme to limit the loss of
significant income generation opportunities
- Transition management costs integrated into
Cultural Quarter project budgets
-  
Focus on….LDN Architects appointed to lead transformation of Elgin Town Hall
During 2023 the project team worked closely with Elgin Town Hall for the Community and a wide range of
other key stakeholders, from Elgin Community Council to the National Theatre of Scotland, to develop a
detailed brief which outlined current building issues and future aspirations clearly.
Page 123

Page 124

18 
Following a two-stage public procurement process, which generated 23 notes of interest, LDN impressed
the panel with their clear, thoughtful approach, and creative concept designs to come out top from a
selection of prestigious practices from across the UK. LDN Architects and a number of consultants within
their design team have bases in the north of Scotland including employing new local members of staff
specifically to work on this project, assisting the Cultural Quarter in delivering our commitment to
Community Wealth Building. 
Work is now underway to progress RIBA Stage 2 concept designs in line with the first phased submission of
the Cultural Quarter Full Business Case which is due late Q4 23/24 / early Q1 24/25. The proposed
redevelopment will overcome limitations of the current building to create a welcoming 21st century
performance and community space which builds on the success of the existing venue. Redesign of the
building will improve circulation, acoustic separation, environmental performance and add a new multi-use
studio space to enhance and widen programming. Updating the already popular Elgin Town Hall will enable
the venue and Elgin to take its rightful place as the third major cultural centre in a row of important
northern capitals.   
Page 124

Page 125

19 
3.2.4 Digital Health
Value £5m capital 
Lead Body Rural Centre of Excellence (RCE) for Digital Health and
Care Innovation
Current status Achieved approval for the project Full Business Case in
Q3 21/22 and is now in delivery
Project vision  Creation of an anchored demonstration and simulation
environment (DSE) and Living Lab testbeds for the Moray
region. 
Project summary
The Rural Centre for Excellence (RCE) is a complex programme of Research & Development based assets
(DSE and R&D infrastructure) in Moray. It links to developing a portfolio of five Living Labs as a vehicle for
exploring novel concepts, iterating solutions and evaluating innovations to complex health and care
challenges. Since the programme started in late 2021, a number of important key achievements have been
realised - particularly over the last 18 months where the RCE innovation team have been mobilised. 
At the end of 2023 the project submitted a change request that was approved by the MGD Board seeking to
extend the project by a year to May 2026.  This is in light of the Rural Centre for Excellence securing a longer
term funding agreement from the Scottish Government.  The additional time will be used to create a more
holistic, connected set of healthcare applications. 
The £5m of capital needed for this project is being provided by the UK Government.   
One key lesson learned by RCE is that the Moray region and partners were not fully primed to support
innovation and digital from the outset. Intensive work is now ongoing with Health and Social Care Moray
(H&SCM) and the wider community to support them in developing capacity and aligning with their strategic
priorities. There is a notable commitment from H&SCM, who has recently included the Living Lab themes in
their long-term strategic planning. In common with social care capacity across the UK, pressures in this
sector does constrain ability to engage and deliver at pace. The digital health initiative funded by the Moray
Growth Deal is an opportune investment to support R&D and sector-wide innovation (which is likely to
increase productivity). 
Strategic Landscape  
The health and care sector continues to face challenges as increasing demand for services exceeds the
ability of services to accommodate this. That said, the innovation landscape in the UK is experiencing
significant momentum with various initiatives underway to harness technology, data and collaborative
efforts to enhance healthcare delivery. The main trends to note are: 
1. Increasing technology integration to bring digital health solutions into healthcare systems and
provide more personalised care.  
2. Data utilisation efforts to leverage vast amounts of data to explore ways to identify trends, predict
changes, personalise care and optimise resource allocation via data-driven approaches. 
3. Focus on prevention and well-being: There is a growing shift toward preventative care and holistic
well-being. Initiatives aimed at promoting healthy lifestyles, mental health support, and early
intervention to prevent chronic conditions are gaining traction. 
The landscape in the health and care sector is ever evolving. Advancements in technology, changes in
policy, and societal needs continue to shape the direction of innovation in the UK, against an uncertain
funding backdrop. 
Headline achievements 
Living labs
Page 125

Page 126

20 
• During 2024,Living Lab 1 (Supported Self-Management) will progress through it’s development phase
and into testing.   
• Living Lab 3 (Care in Place) has progressed significantly over the last year, with two key assets (both
fundamental to the full RCE infrastructure) developed, and the user testing phase nearing completion.
The first asset to emerge for this living lab is the Community Connections @Moray platform and is the
spotlight focus in this year’s report. The second asset is the creation of a Personal Data Store (PDS).  The
scope of the work is around integrated care, and looking at equipping citizens with a Personal Data Store
that allows them to keep a copy of their data online and take it with them as they move between different
health, care, third sector and independent organisations.  It will also potentially contain information from
health professionals, making it easier for them to understand the healthcare journey of patients. 
• Living Lab 2 (Long Term Condition Co-Management) NHS pathway was activated in 2023, as definition
and initiation workshops highlighted a need to find digital solutions to support access deprivation and
the sustainability of a clinical service to support those with a type 2 diabetes diagnosis. 
• Living Lab 2 (Long Term Condition Co-Management) community pathway was also activated and
workshops took place with the Occupational Therapy (OT) service to develop a call to industry to
develop digital solutions to improve access to the service and reduce waiting times.
• Significant re-scoping for Living Lab 4 (Smart Housing/Smart Communities) and Living Lab 5 (Mental
Wellbeing) with realignment of the site from Dallas Dhu to Leanchoil Trust in partnership with the
Housing Mix project.
• Developing key enabling R&D digital infrastructure to allow the work to take place.
• Progressing information governance and EQIA assessments. 
Skills
• A skills grant was awarded to UHI Moray to develop an online learning module "Digital Essentials for
Carers” comprising four short units – learners receive a digital ‘badge’ on completion of each unit and a
digital certificate to confirm completion of the overall module, which can support the Continuous
Professional Development (CPD) of paid staff.
• SkillsFest event took place at UHI Moray in November 2023 - the key focus of this R&D skills-related
gathering was to share the RCE skills work and outline how innovation assets and strengthening the
skills and education pathway can enable the region to become more attractive, increasing the skills
across the system.
• Curating skills and activities that support capability and capacity building for the ecosystem that will
need to understand how to innovate and use digital tools (e.g., Micro credentials and upskilling out-
reach activities). 
Procurement
• Dynamic Purchasing System (DPS) was activated as the innovative procurement vehicle for RCE calls to
industry. 
Comms and Engagement
• The Demonstration and Simulation Environment (DSE) was set up and launched early in 2023. A launch
event was held in April to mark the occasion, with a closed session in the morning with invited delegates
and an open session in the afternoon for the general public to experience the DSE.
• Procurement of a collaboration platform to support the Digital Innovation Hub and Citizen Panel
activities for the RCE project.
• Developing a network of stakeholders and a strong project board including sub working groups aligned
to thematic areas (e.g. skills, sustainability).
• Developing international opportunities and hosting international visitors at the DSE in Moray.
• Reaching over 300 participants locally, over 60 registered for the RCE citizen panel. 
Evaluation
• Strategic Evaluation Partner contract was successfully appointed to University of Highlands and Islands
with the draft evaluation framework being developed. 
Sustainability and inward investment
Page 126

Page 127

21 
• RCE Sustainability working group was set up and an outline sustainability plan has been developed by
the Commercial Innovation Lead.
• Supported bid-development in the region including a successful community research network funded
through UKRI and further digital inclusion funding from SCVO. 
Strategic
• Internal audit completed in December 2023 with positive feedback received. 
Key milestones 
Milestone Due Date
Living Lab 1 and 3 to move to real world evidence stage Q1 24/25
Development activity for  living lab 2 to commence for community supported
diabetes pathway
Q1 24/25
Invitation to tender launched via the DPS for Occupational Therapy Service support
(living lab 2)
Q1 24/25
Living labs 4 and 5 to commence Q1 24/25 
Risks and issues that require management by the project team during 2023 
Risk / issue Effects Mitigation
Risk:  Ability for key local and
regional stakeholders to support
project innovation activity.  
Has the potential to cause slower
uptake in support for the project
which may cause delays in
reaching milestones.
- Change request approved
during Q4 23/24 that extends
project into 2026. Provides
more time for the project to
develop effective relationships
with all partners to secure the
necessary support to complete
deliverables.   
Focus on….Community Connections app development  under living lab 3 (Care in Place) 
Throughout the RCE project and broader DHI engagement, it has been repeatedly highlighted by citizens
and professionals that there is a need for better access to information and services with a reduced need for
the user to re-tell their story. The Care in Place project team with broad stakeholder representation, have
iteratively codesigned the ‘Community Connections @Moray’ (CCM) platform to offer this in a one stop
shop. 
With an initial focus on unpaid carer need, the CCM platform provides information for both the cared for,
and the unpaid carer, through a holistic, verified and filterable directory of community, third sector, health
and care services and resources. The primary aim is to support self-management and enable access to the
right information at the right time, with sign posting and soft referral where appropriate. By registering with
a name and email address, users will also have access to an ‘about me’ section where they can record their
own journey and personally significant information for automated re-use in referral to a selection of
community services. 
This platform has been developed throughout 2023 and will be tested in the Forres and Lossiemouth areas
in 2024, along with the Personal Data Store. As a core infrastructure asset for the RCE, this platform will
continue to grow and develop along with other living lab activity. 
Page 127

Page 128

22 
Page 128

Page 129

23 
3.2.5 Eary Years Science, Technology, Engineering and Mathematics (STEM)
Value £6.4m (£4.8m capital, £1.575m revenue) 
Lead Body The Moray Council
Current status Working to submit project Full Business Case to the MGD
Board Q4 23/24 FY, with a view to securing clearance to
enter delivery by June 2024.
Project vision  To raise the aspirations of children age 3-8 in Science,
Technology, Engineering and Maths (STEM) 
Project summary
The Early Years STEM project will see investment of £4.8 million of capital funding from both the Scottish
Government and Moray Council. The Scottish Government will commit up to £3.5m and Moray Council
£1.3m. Moray Council will meet revenue requirements (£1.575m) that includes operational costs and
dedicated staffing provision for the duration of the project. 
The nature of work is changing, and where Moray has historically relied upon traditional manufacturing and
retail business, in the future there will be more high level, technology based occupations. Creating more
appeal for STEM related jobs is important to facilitate the evolution of skills required by the future jobs
market, and to ensure Moray is resilient in the future.   
Early Years STEM aims to encourage young people to enter into a STEM related career when they leave
education and focuses on STEM engagement with children in their early stages of learning (age 3-8). The
project develops a STEM learning ecosystem in the Moray area, through the creation of specialist learning
environments and experiences, access to training and resources, and the creation of a STEM learning
network involving key delivery partners, upskilled staff, volunteers from industry and the wider community. 
This innovative development will build on existing educational practices and initiatives, and will create the
necessary infrastructure to support a STEM skills pathway from early years through to broad general
education and beyond. 
The project will invest in state of the art facilities in community settings throughout Moray, each offering a
unique experience that can be delivered flexibly across the region, including mobile and outreach offerings.
These Hubs will aim to inspire and enhance the STEM learning experience of children and staff through age
appropriate, curriculum aligned and industry related STEM experiences, and will offer accessibility to
parents, employers and the wider community, thereby allowing inter-generational learning to take place. 
The aspiration of this strategy is to close the equity gaps in participation and attainment in STEM, ultimately
leading to more young people choosing STEM occupations at a later stage in their lives.     
Headline achievements
Significant progress has been made during 2023 with the development of infrastructure, operational plans
and partnership arrangements.   
Sites have been identified for all four STEM centres, with particular focus on planning for the first of these
located within Elgin Library.  A multi-disciplinary design team led by Moray Council has been appointed and
early architectural proposals developed for the Elgin facility.  Planning will continue into 2024 as proposals
are developed for the satellites sites in Forres and Buckie, as well as a unique outdoor environmental
education centre in a central location. 
These facilities will be complemented by a robust outreach provision that includes a mobile offer and STEM
Lending Resource, delivered in collaboration with UHI Moray’s STEM Outreach team and with support from
key STEM providers across Moray. UHI Moray’s Lend a Lab initiative is now being offered to Moray schools
and 2024 will see partners adopt an iterative and collaborative approach to further develop this model and
extend the reach of STEM engagements from early years through to primary education. 
Page 129

Page 130

24 
Proposals are being finalised for inclusion into the Early Years STEM Full Business Case which is on track for
submission to the Moray Growth Deal Programme Board early in 2024. Approval of the Full Business Case will
secure funding to commence a capital development programme and official launch of the first STEM centre
location in August 2025. 
Key milestones
As we head towards completion of the Full Business Case, 2024 will see significant progress on a number of
elements: 
Milestone  Due Date 
Phase 1
Design phase RIBA 3-4 incorporating exhibition and interpretation Q2 24/25
Full Business Case submission Q1 24/25
Staff recruitment and curriculum development Q1 24/25
Official launch of STEM outreach offer Q2 24/25
Construction contractor appointed Q3 24/25
Vehicle and equipment purchase  Q4 24/25
Construction and fit out works complete Q1 25/26
Official launch of Elgin STEM Centre and mobile offer Q2 25/26
Phase 2
Development of proposals and partner agreements  Q1 24/25
Creation of development plans, budgets and architectural drawings.  Q4 24/25
Public consultation  Q4 24/25
Site acquisition, legal processes and planning permissions Q2 25/26
Delivery phase of building works, infrastructure development Up to Q1 28/29
Official launch of Outdoor Environmental Education Centre Q2 26/27
Official Launch of Forres STEM Centre Q2 27/28
Official Launch of Buckie STEM Centre Q2 28/29 
Risks and issues that require management by the project team during 2024 
Effects Mitigation
Risk:  Rising construction
costs and scope change.
Potential to affect the
scale and ambition of
the project that could
affect outcomes and
benefits.
- Re-develop existing space to reduce costs. 
- Experienced architectural team to provide
budgets and sound project management.
- A phased approach to implementation of
facilities that will identify rising costs, capture
lessons learned and make early interventions.
- Close liaison between teams.
- Adopt value engineering approach.
Risk: Insufficient
operation planning and
budgets.
Inability to realise
outreach activities.
- Delivery model revised during 2023 to fit the
capital and revenue budget available.  
- Build in elements to the project that will attract
future funding opportunities to support core
staffing and continued refreshment of the
project.
- Grow partnerships with other STEM providers. 
- Develop a delivery network of volunteers and
industry ambassadors to ensure the longevity
of the project.
Risk:  No change in
community attitudes or
regular repeat visitations
to STEM centre
infrastructure. 
Improvements in STEM
attainment levels not
realised.
- Consultations with education staff, young
people and the community throughout the
design process to understand need.
Page 130

Page 131

25 
- Engagement with other STEM providers,
partnering and providing a web of joined up
inspiring and age appropriate experiences
- Identify barriers to participation and seek to
remove where possible. 
- Flexible and dynamic approach to curriculum
development and project delivery.
- Implement CPD training to benefit all schools
through the Associated School Group (ASG)
network 
Focus on….the project’s first hub in Elgin Library
The first phase of the MGD Early Years STEM Project will see development of an Early Years STEM Discovery
Centre and Community Learning Hub, hosted within Elgin Library at Cooper Park. The space will serve as a
focal point for early years STEM education, delivering interactive learning experiences to Early Learning and
Childcare settings, primary schools, and home educators across the region. 
The partnership with Elgin Library delivers  mutual learning objectives while sharing resources, through co-
location, provision of specialist equipment and support from staff.   
2023 has seen significant progress planning for this facility.Moray Council’s Architect led Design Team have
developed proposals to RIBA stage 2 which sees the former drill hall area transformed into an early years
interactive learning resource. An exhibition and interpretation design partner is being appointed in January
2024 to fit out the space incorporating bespoke learning equipment and educational programmes. 
Stakeholder consultation is being planned for 2024 where users of the space will contribute to design plans
and support the creation of a state-of-the-art facility that will transform STEM learning in Moray.   
Page 131

Page 132

26 
3.2.6 Housing Mix Delivery
Value £7.5m capital 
Lead Body The Moray Council
Current status The full business case is expected to be approved late 
Q4 23/24 enabling the  project to enter delivery
Project vision  Stimulating housing development in town centres, unlock
constrained sites and promote the integration of pilot
exemplar sustainable design and construction
techniques. 
Project summary
The Housing Mix Delivery is a £7.5m project with a commitment of £5m from the Scottish Government and
£2.5m from Moray Council. The project supports the delivery of up to 360 affordable houses and plots; 150
short-term construction jobs annually; stimulates the private housebuilding sector to deliver up to 500
market houses; supports town centre regeneration of brownfield sites; and provision of housing in rural
towns and villages. 
Headline achievements
• Strategic progress: Full Business Case approved by Moray Growth Deal Programme Board on 29
September 2023.
• South Street, Elgin: Legal agreements signed between partners, site acquisition commenced in
November 2023. Design completed to RIBA Stage 2, and RIBA Stage 3 work started in November 2023.
• Dallas Dhu, Forres: Design team was appointed in March 2023. Proposal of Application Notice (PAN)
submitted on 16 June 2023 and revised PAN was submitted on 21 November 2023 to include student
accommodation. 
• Hillside Farm, Dufftown: Design team appointed in June 2023. Community Engagement Events held on 9
August 2023 and 6 December 2023. 
• Speyview, Aberlour: Funding package agreed by the Scottish Government More Homes Division to
provide additional funding given the Growth Deal investment. 
Key milestones 
Milestone Due Date
Clearance for the project to enter delivery (from the Moray Council and the Scottish
and UK Governments)
Q4 23/24
South Street, Elgin:  Submission for planning consent Q4 23/24
Dallas Dhu, Forres:  Submission for planning consent  Q4 23/24
Hillside Farm, Dufftown:  Draft Masterplan to be approved by Council`s Planning and
Regulatory Services Committee
Q4 23/24
Speyview, Aberlour:  Funding Agreement to be signed and Growth Deal investment
of £700,000 to be spent
Q1 24/25
Hillside Farm, Dufftown:  Final Masterplan to be approved by Council`s Planning and
Regulatory Services Committee
August 2024 
Risks, issues and opportunities  that require management by the project team during 2023 
Impact Mitigation
Risk:  Inflation and construction
costs continue to rise.
The project is able to invest in
fewer sites throughout Moray as
the budget was fixed in 2021 and
will not be adjusted for inflation. 
Whilst this is a risk the project is
managing, it is still projected that
A cost consultant has been
engaged to control the
investment costs for each site. 
Funding from additional sources
will be sought. 
Page 132

Page 133

27 
the expected benefits will be
realised.   
Risk: Inability to attract external
sources of funding to support
the delivery of the project.
Project scope may need to be
changed or the delivery
timescales elongated. 
The Council is actively exploring
external funding options, such as
UK Shared Prosperity Fund, Just
Transition and UK Government
Long Term Plan for Towns.
Risk: Activity being progressed
by other Growth Deal projects or
economic development activity
in Moray has a negative impact
on HMD. 
Potential for other activity to
impact the ability for HMD to
create the right environment for
success with stakeholders and
realise all of the benefits sought.
Good working relationships have
been established between
Growth Deal Project Managers. 
This is evidenced through
constructive collaboration with
the Business Enterprise Hub on
South Street redevelopment.   
Focus on….South Street (Elgin) regeneration project 
This is a partnership project between Moray Council, Moray College UHI and Robertson Property Ltd; and
forms part of two Moray Growth Deal projects: Housing Mix Delivery and Business Enterprise Hub. The
overall site comprises five separate ownerships: 
• M&Co, 51 South Street (long vacant)
• Elgin Furniture & Carpet Store, 53-55 South Street (operating business)
• Junners, 57-61 South Street (long vacant)
• Jailhouse, 130 High Street (derelict)
• Newmarket Bar, 130 High Street (derelict) 
This regeneration project will deliver the Business Enterprise Hub, 38 one and two bed flats and
opportunities for 2-3 small retail units. 
During 2023 design was progressed to RIBA stage 2 and in November 2023 entered into RIBA Stage 3. Legal
agreements were signed by all parties and development agreements have been drafted late 2023. Site
assembly started in late 2023 and public engagement event was held on 16 December 2023. A detailed
planning application is anticipated to be submitted to the Council during Q4 23/24. 
Page 133

Page 134

28 
Page 134

Page 135

29 
3.2.7 Moray Aerospace, Advanced Technology and Innovation Campus (MAATIC)
Value £24.4m capital 
Lead Body UHI (University of Highlands and Islands)
Current status Project under review in light of funding challenges.  
Project vision  A cutting edge commercial and academically supported
training and research centre for excellence that will
provide advanced skills for the region’s industries. 
Project summary
This project aims to deliver a once-in-a-generation combination of the Moray Growth Deal, strategic
aerospace developments and a partnership with Boeing to provide a genuinely transformational
opportunity for the region and its people.  Funding for the facility will be provided by the UK Government
(£21m) and Highlands and Islands Enterprise (£3m).   
Having received an updated and detailed proposal from Boeing in summer 2023, regarding how they will
support the MAATIC facility, the project team is working to develop a Full Business Case that focuses on five
streams of activity: 
1) Boeing /Civil Aviation Authority(CAA) / Air Services Training (AST - Existing skills and training vehicle
of UHI Perth)  condensed part 66 and type approved training (aerospace and aviation)
2) Immersive training centre for safety critical systems (immersive technologies and synthetic training)
3) Delivery of a suite of integrated programmes of education covering aerospace, aviation, immersive
technologies, advanced manufacturing and innovation
4) Centre for research in aerospace and sustainable fuels (aviation, aerospace and innovation)
5) Innovation and development space 
The MAATIC building itself will house commercial and academic leading-edge research on these emerging
technologies, will be a training facility to support the skills required to underpin and deliver these
technologies. It will have a communal space for the promotion of STEM developments and opportunities to
the community and to the next generation of technologists. 
Whilst the Business Enterprise Hub, MICM and MAATIC FBCs aim to solve different challenges regarding
business growth and skills, there are significant synergies and work has taken place to ensure clarity on the
scope of each, areas for potential overlap and how these can be successfully managed.   
Headline achievements 
During 2023 the project developed a revised vision for the project that saw a move to focusing on leading
edge digital skills for the aerospace industry that is supported by Boeing, the application of digital learning
to other safety critical environments and R&D opportunities.  With no need for the facility to be located near
to a runway, other sites in Moray have been appraised. 
A key project USP is a progressive, mutually beneficial relationship with Boeing. Following work to refine the
vision for the facility and how Boeing could support this, both parties advanced the development of a formal
partnership agreement. 
From a resourcing perspective, the pace of progress during 2023 has been affected by staff changes and
availability.  Steps were taken at the end of 2023 to mitigate this in the future with responsibility for the
project moving from UHI-Moray to UHI-Executive Office 
Page 135

Page 136

30 
Key milestones 
Milestone Due Date
UHI to conclude internal review of the project FBC. Q4 23/24
Subject to the above,the following steps will be taken to advance the project:  
- UHI and Boeing to sign a partnership agreement
- Resubmission of MAATIC FBC to the MGD Board, with a view to commencing the
process to secure Government and Moray Council approval.
- Government clearance and Council approval to be secured, enabling the project
to enter delivery
- MAATIC project to enter delivery 
Q4 23/24
Q4 23/24 
Q2 24/25 
Q2 24/25 
Risks and issues that require management by the project team during 2024 
Effects Mitigation
Issue: The FBC in  it’s current
form cannot be progressed.
Potential for delay and rework. Close collaboration with key
stakeholders.
Risk: Gaps between actual and
projected targets around student
numbers, research and
innovation.
Alters the financial model and
potentially the viability of the
project as a whole.
Robust planning during the
implementation phase and
regular reviews of data so the
project and Business As Usual
teams can take action as needed
to realise targets set.
Risk: Delay in site acquisition. Affects the delivery timescales
for the project.
Close collaboration with key
stakeholders.
Risk:  Increase in capital costs
render original plan
unaffordable.
Threatens planned
redevelopment of site and FBC
plans.
Should the revised costs push
beyond the budget explore
refinements to reduce costs that
mean project objectives can still
be achieved.   
Focus on….creating a digital learning environment for aerospace skills
Throughout 2023 the project worked closely to redefine the vision for the facility in light of the industry
moving towards hybrid (virtual and physical) training for aerospace skills. UHI sought to ensure that a multi-
dimensional operating and financial model was in place that would mean the continued viability of the
campus. 
Central to the new vision is the use of augmented, immersive teaching environments for condensed part 66
training. The project will work with Boeing and the Civil Aviation Authority in light of changing regulations to
integrate virtual ways of working into teaching.   
In creating these teaching environments, the project will look to the academic and R&D opportunities
within the facility to include both digital skills and apply the learning environments to other safety critical
environments.   
3.2.8 Manufacturing Innovation Centre for Moray (MICM)
Value £7m (£5.6m capital, £1.36m revenue) 
Lead Body Highlands and Islands Enterprise
Page 136

Page 137

31 
Current status The full business case is expected to  be approved late
Q4 23/24 enabling the project to enter delivery 
Project vision  A focal point for businesses to learn best practice and
collaborate, stimulating the creation of new and growth
of existing micro businesses throughout Moray. 
Project summary
The key driver for this project is to achieve a grassroots cultural shift in how Moray businesses gain insight
into the latest process and production efficiencies that are available, and how they can use them for product
and process innovation.  
The Manufacturing Innovation Centre for Moray (MICM) will act as a local focal point for business to access
best practice and identify how they can collaborate with universities and other research institutes. They’ll be
quickly supported to access the relevant support from organisations such as Highlands and Islands Enterprise
(HIE), National Manufacturing Institute Scotland (NMIS), Scottish Manufacturing Advisory Service (SMAS),
Interface (the knowledge connection for business), Business Gateway and other service providers to meet
their needs.  
The project will receive both capital (£610k from the Scottish Government, £2.4m from the UK Government
and £2.5m from Highland and Islands Enterprise) and revenue funding (£1.25m from Highlands and Islands
Enterprise).
MICM will provide services that are customised to the needs of rural manufacturing business, it will also act
as a vital access point for local businesses to engage with the National Manufacturing Institute for Scotland
and other national innovation support services. 
The development of the FBC during 2023 has supported our view that, while much has changed since the
Moray Growth Deal was developed, the core need to support a vital sector to improve and innovate has not
and MICM’ s mission is more relevant than it was in 2019. 
Headline achievements
Our focus during 2023 has been to develop the Full Business Case and to gain approval for the project to
progress. 
Key achievements include: 
- Development and approval of change request covering the project’s location, no longer co-locating
with the MAATIC project, but refurbishing existing buildings with some new build construction on
the Forres Enterprise Park.
- Whilst the MICM, MAATIC and Business Enterprise Hub projects all tackle different audiences
regarding skills and business development, work developed the potential for overlap and synergies
with each. 
- Development of the project’s Full Business Case that was approved by the MGD Board in September
2023.  
- Engagement with the Government to enhance the FBC following comments from Policy Advisors.  
- Approval of the FBC by HIE Board. 
Key milestones 
Milestone Due Date
Complete design  February 2024
Page 137

Page 138

32 
Planning approval March 2024
Commence construction   May 2024
Key staff recruited Autumn 2024
Complete construction Autumn 2024
Operational stand-up  Autumn 2024 
Risks and issues that require management by the project team during 2024
MICM Is currently managing the following major risks: 
Risk Effects Mitigation
Cost inflation affects project
affordability.
Compromises what MICM can
deliver.
Monitor. Contingency is built
into cost model. Construction
starts in2024.
Lack of productive engagement
with the business community.
Vision for MICM diverges from
what the business community
would like to see.
Consultation events with the
Moray Growth Deal, Business
Assembly and Chamber of
Commerce, as well as a broader
business survey. Ensure
involvement with Project Board.
Revenue assumptions are
overoptimistic.
Revenue shortfall Sensitivity analysis in FBC.
Develop alternative revenue
sources. 
Focus on….how the project will support businesses to grow and innovate
The ambition for MICM is to create a grassroots cultural shift in efficiency and innovation for Moray’s
manufacturing businesses. HIE work with manufacturing businesses across our region to support their
development and we see a clear and growing need for local support to access the best practice required to
make the leap to the next level. 
Some recent examples include: 
- A manufacturer developing lighter components using composites is looking for support in
development of validation and testing of components from NMIS and the national Lightweight
Manufacturing Centre. This will require at least two week’s travel to the central belt for key
personnel who are currently in the middle of a demanding scale-up project.  The company is
currently weighing the benefits of continuing with the project. With MICM in place they could
access a local venue for both equipment and project support reducing costs and disruption and
bringing the test equipment closer to their processes.   
- A Caithness based engineering company has been affected by a shortage of skilled labour. Having
analysed their manufacturing processes, they believe that automation of their production line
might help. With support from HIE, the company attended a demonstration event held in Thurso
by the North Lanarkshire SmartHub to explore the use of cobots (collaborative robots) to improve
their welding processes. During the event the company met with an equipment vendor and have
gone on to develop a project to install and evaluate a small cobot at their Caithness site.  The
potential prize for the company is an expansion of working hours, reduced order fulfilment times
and securing further orders. This is a great example of the type of project that we want MICM to
work for Moray businesses – using a centralised hub to provide links and opportunities for SMEs to
access best practice in manufacturing and supporting them to evaluate how it could benefit their
business. 
Page 138

Page 139

33 
Cobot demonstration at SmartHub 
Page 139

Page 140

34 
4. Forward look at activity planned for 2024
4.1 Work to get all Growth Deal projects into delivery
The Moray Growth Deal entered 2023 with one project in delivery, Digital Health. This was quickly
joined by Bus Revolution that received clearance to enter delivery in March 2023.
Building on this, in the second half of 2023, three project FBCs were developed and submitted for 
formal review by the Scottish and UK Governments:
▪ Business Enterprise Hub
▪ Housing Mix Delivery 
▪ MICM
These documents have been the subject of extensive consultation and received approval from a
number of different governance steps.  
Project Pre-submission
workshop with
the
Governments
Project
Board
approval
MGD Programme Board
approval
Other
approvals
Moray
Economic
Partnership First
approval to
trigger
Government
review
Second
review
following
Government
feedback
BE Hub 21 Jun 2023 27 Jul 2023 11 Aug 23 12 Dec 23 26 Jul 23:
Moray
College
Board
14 Dec 23
Housing
Mix
Delivery
3 Aug 2023 20 Sep 2023 29 Sep 23 12 Dec 23  14 Dec 23
MICM 3 Aug 2023 8 Sep 2023 25 Aug 23 12 Dec 23 31 Oct 23:
HIE Board   
14 Dec 23 
By the end of Q4 23/24, four of the eight Growth Deal projects  are expected to be in delivery
(Housing Mix Delivery and MICM joining Digital Health and Bus Revolution),with the Business
Enterprise Hub due to be the fifth once the revenue shortfall has been resolved. Of the three
remaining projects:
▪ The Cultural Quarter and EY STEM projects are expected to submit their FBCs to the MGD
Board during Q4 23/24.
▪ An FBC has been drafted for MAATIC that  is currently being reviewed.  
4.2 PMO Milestones to be achieved
During the course of 2024, the Moray Growth Deal PMO is working to achieve a number of key
milestones: 
Milestones Target date
Page 140

Page 141

35 
Work to understand planning implications (resources, risks, opportunities)
associated between the Growth Deal, Levelling Up Fund and the Long Term Plan
for Towns fund. 
Q4 23/24
Deal annual conversation involving senior officers from Moray Council and the
Scottish and UK Governments.
Q4 23/24
Housing Mix Delivery and MICM full business cases to be approved and clearance
secured for the projects to enter delivery.
Q4 23/24
Business Enterprise to enter delivery once revenue budget confirmed. Q4 23/24 or Q1 24/25
2024/25 grant offer letter to be agreed with the Scottish Government, confirming
the level of funding to be provided during the financial year.  
Q1 24/25
Publication of the Deal’s 2023 annual report. Q1 24/25
Cultural Quarter andEY STEM project full business cases to be approved and
clearance secured to enter delivery.
Q2 24/25
Second tranche of in-life reviews to be scheduled. Q2s and 3 24/25 
4.3 Factors needing action or future activity could be impacted 
There are a number of ‘uncertainties’ that could have a positive or negative impact on Growth Deal
activity that are being managed at both a programme and project level.  Key uncertainties include: 
▪ Consideration needs to be given to how Growth Deal activity interacts with projects funded
through Levelling Up and the Long Term Plan for Towns Fund to ensure that they
complement each other, that there is no overlap and that there are no inadvertent risks
created as the work is commissioned.  
▪ With the potential for construction projects associated with the Business Enterprise Hub,
Cultural Quarter and Housing Mix Delivery occurring at the same time in Elgin, planning will
need to take place with key stakeholders to ensure any potential disruption for the public
and businesses is minimised.
▪ Cost inflation and the affordability of projects remains a potential risk. During 2023
significant work was undertaken by Project Managers to rework aspects of construction
plans an operational models to ensure they meet capital and revenue projections. Looking
into 2024, the greatest budgetary challenges will be faced by Cultural Quarter’s two
significant building refurbishments; MAATIC design activity for their campus; and the
continued affordability of work by Housing Mix Delivery to increase affordable and private
house building rates in Moray.  
▪  At a time when Moray Council and other public organisations are facing significant
budgetary challenges, it’s important to manage when and how communications related to
Growth deal activity are released. This  ensures messages about changes to the Council or
partner budgets are separate from news about Growth Deal investment.   
4.4 Monitoring the benefits to be realised by the Deal
Significant progress has been made to ensure a firm baseline is in place on what benefits and their
associated targets will be delivered at both a programme and project level, with a completed
Benefits Realisation and Monitoring Plan due to finalised in Q1 24/25. This is a quarter behind
original projections, primarily due to procurement delays experienced. Key activity that needs to be
completed includes:
▪ A procurement call for consultancy support to gather evidence for programme level
indicators took place during Q3 23/24, however, this was unsuccessful which has delayed
the plan. During Q4 23/24 into Q1 24/25 the PMO will work to secure consultancy support
to complete this work.
Page 141

Page 142

36 
▪ Work has taken place with projects on the monitoring plans needed as full business cases
are developed. 
▪ During Q1 24/25, the PMO will submit a paper to the MGD Programme Board that draws
together all of the information above into a Benefits Realisation and Monitoring Plan. This
will be include a stock check to make sure the Deal is on track to deliver the outcomes set
out when at Full Deal signing in December 2021.   
Page 142

Page 143

37 
5. Financial summary
5.1 Funding sources for Deal activity
During 2023 the funding landscape for the Moray Growth Deal remained static, with no changes to
the funding agreement in place between the Moray Council and the Scottish and UK Government.  
The same capital and revenue profile as reported in the 21/22 annual report remains valid, however,
there is the potential for a reduction in the capital cost associated with the MICM project. The profile
contained within the financial model of the approved business case, sees capital costs reduce from
£6.87m to £5.6m. During 2024 consideration will be given to how this underspend can be reallocated
to other Growth Deal activity.
As highlighted in section 4, there is potential that projects such as Cultural Quarter may have
difficulties funding the current aspiration and scope within the existing funding , however, work will
take place to adjust construction plans and seek other sources of funding.
Project Scottish
Government
investment (£’000)
UK Government
investment
(£’000)
Local partner
investment
(£’000)
Total investment
(£’000)
Capital
Bus Revolution 4,000 - - 4,000
BE Hub 3,300 - 1,000 4,300
Cultural Quarter 12,700 3,500 15,400 31,600
Digital Health - 5,000 - 5,000
Early Years STEM  3,500 - 1,300 4,800
Housing Mix Delivery 5,000 - 2,500 7,500
MAATIC* - 21,000 3,390 24,390
MICM 750 (610 in project
FBC)
3,000 (2,442 in
project FBC)
3,140 (2,557 in
project FBC)
6,890 (5,609 in
project FBC)
TOTAL 29,250 (reducing to
29,110 due to
MICM FBC)
32,500  (reducing
to 31,942 due to
MICM FBC)
26,730 (reducing
to 26,147 due to
MICM FBC)
88,480 (reducing
to 87,199 due to
MICM FBC)
Revenue
Bus Revolution - - 322 322
BE Hub 2,000 -  2,000
Cultural Quarter   700 700
Early Years STEM - - 1,575 1,575
MAATIC* - - - -
MICM 1,250 - 110 1,360
TOTAL 3,250 - 2,707 5,957
* Level of funding expected to be higher due to private benefit in kind contribution and HIE revenue support 
5.2 Funding drawn down from Scottish and UK Governments  - Q4 22/23 to Q3 23/24
In line with the conditions associated with Scottish and UK Government funding, projects can only
draw down funding once their full business cases have been approved by the MGD Board, both
Governments and the Moray Council. During 2023, two projects had reached this stage:
Project Government
investment
(£’000)
Draw down (all figures £’000)
Previous draw down
up to Q2 22/23
inclusive)
Period covered by this
annual report (Q4
22/23 to Q3 23/24)
Total draw down to
date 
Bus Revolution 4,000 0 738 738
Digital Health 5,000 1.505 1,293 2,798
TOTAL 9,000 1,505 2,031 3,536
Page 143

Page 144

38 
6. 2023 communications activity
May 2023 saw the publication of the 2021/22 Moray Growth Deal Annual Report, alongside a round
up of the status of each project. As more projects progressed through their planning and business
case stages, activity increased during 2023. This included media releases, social media posts and
stories with live streaming from events alongside in-person engagement activity and events,
specifically:
Bus Revolution project, m.connect on demand public transport services
The comms and marketing campaign for m.connect started with a driver recruitment campaign in
February 2023 and the commencement of services in May. This progressed to full phase one service
delivery marketing and official Ministerial launch by August 2023. 
The launch involved the unveiling of the first name of one of the electric buses, which was open to all
residents in Moray to suggest as part of the engagement campaign, which attracted over 200 entries.
Promotion of the services and new developments to the offering, including group bookings,
continued throughout the year.
Business Enterprise (BE) Hub
The details of the Business Enterprise Hub were further highlighted in November 2023 as part of the
wider promotion of regeneration activity planned for South Street in Elgin.  Building on this, a drop-in
exhibition was held in December 2023 to explain the vision to local residents attracting over 600
visitors. Planning applications and full business case approval will enable further communications
and engagement opportunities to take place in early 2024.
Cultural Quarter
The Cultural Quarter has picked up momentum this year as details were released on the plans for
Grant Lodge and investigative works, with updates given online and in person at local events such as
Doors Open Day tours in September 2023. A further significant milestone was marked when LDN
were appointed as the design team for Elgin Town Hall in November 2023.  
Digital Health 
Digital Health Innovation launched its Demonstration and Simulation Environment (DSE) Space in
April 2023, which propelled the communications and engagement activity into the delivery phase.
After the initial launch comms, further in-person engagement was undertaken to encourage
residents to join the citizens panel and to highlight work being delivered by the project.  
EY STEM
Early Years STEM engagement took place at a number of Local Development Plan events held across
Moray during 2023, which included introducing the project to local residents. 
Housing Mix Delivery
Updates were provided on the appointment of the design team for the Dallas Dhu phase of the
Housing Mix Delivery in April 2023, following community engagement. The progress of activity in
Dufftown was shared at drop-in exhibitions and the South Street development was shared as part of
drop in session promoting the wider regeneration of this part of Elgin in December 2023. 
Page 144

Page 145

39 
MAATIC
Due to the nature of negotiations with partners involved and changes being made to the project
vision, limited public engagement took place during 2023. This is, however, expected to change as we
enter 2024 and the project works to secure approval of its full business case and conclude
discussions on their preferred site location.  
MICM
Communications activity has been limited as the project worked to develop their full business case
and move away from co-locating with MAATIC to a stand along facility on the Forres Enterprise Park. 
The project entered delivery in early 2024 and communications are planned as the service hub
offering is established in time for it’s opening by autumn 2024.   
Page 145

Page 146

40 
7. Programme structure and governance structure
7.1  Structure of Moray Growth Deal activity and Officers involved
Following the recruitment of programme and project teams during in the first half of 2022, there has
been continuity and stability in the majority of roles during 2023. This has helped maintain the pace
of activity and is a contributing factor to the progress that has been made.
The roles that have changed during 2023 include:
▪ Lynne Owen has joined the Programme Management Office as a Programme Officer
▪ Allane Hay stepped down as Project Manager of the Business Enterprise Hub following
completion of the full business case. Samantha Scott, who had been working with Allane,
has now taken up this role.
▪ The lead body for MAATIC is now the UHI-Executive Office, with a new SRO (Max Brown,
Director of Transformation) and PM (Steven Gregg).
Executive oversight of the Moray Growth Deal
• Rhona Gunn, Depute Chief Executive and Moray Growth Deal Senior Responsible Officer (SRO) (Moray
Council)
• Jim Grant, Head of Development Services (Moray Council) – day to day oversight 
Programme Management Office
• Michael Kelly, Programme Manager (Moray Council)
• Lynne Owen, Programme Officer (Moray Council) 
Project Delivery
Teams in place within different organisations working to deliver the eight projects that make up the Moray
Growth Deal. 
Bus Revolution (led by Moray Council) 
• PM:  Stevie Robertson, Senior Project Manager
• SRO:  Nicola Moss, Head of Environmental and
Commercial Services 
Business Enterprise Hub (led by UHI-Moray) 
• PM:  Samantha Scott, BE Hub Project Manager
and Deputy Head of Academic Partnerships at
UHI-Moray
• SRO:  David Patterson, UHI-Moray Principal
Cultural Quarter (led by Moray Council) 
• PM:  Claire English, Senior Project Manager
• SRO:  Jim Grant, Head of Growth and
Development 
Digital Health (led by the Digital Health Institute) 
• PM:  Marie Simpson, Programme Manager
• SRO:  Janette Hughes, Director of Planning and
Performance
Early Years STEM (led by Moray Council) 
• PM:  Sarah Barnes, Senior Project Manager
• SRO:  Hazel Sly, Early Years Service Manager 
Housing Mix Delivery (led by Moray Council) 
• PM:  Hilda Puskas, Senior Project Manager
• SRO:  Gary Templeton, Principal Planning
Officer
MAATIC (led by UHI-Executive Office) 
• PM:  Steven Gregg, Project Manager at UHI
Executive Office
• SRO:  Max Brown, Director of Transformation
at UHI Executive Office 
MICM (led by HIE) 
• PM:  David Howie, Head of Strategic Projects
• SRO:  David Reid, Area Manager (Moray) 
Page 146

Page 147

41 
7.2 Summary of assurance activity progressed during 2023
The Deal has a series of assurance ‘gates’ in place that, when triggered, require submissions to be
made to the MGD Board for approval to progress.
Gate
A B C D E F
Approval of
Strategic
Outline Case
(SOC)
Approval of
Outline
Business Case
(OBC)
Approval of Full
Business Case
(FBC)
Closure of a
project
Change request
to previously
agreed baseline
In-life review 
Gates A-E are project led requests, whereas Gate F is a schedule of in-life reviews initiated by the
PMO that allows the MGD Board to take a more in-depth look at projects that are in delivery.  During
2023 the MGD Board considered the following assurance activity:
Date Project Assurance
gate
Description Status
Jan
2023
DHI E:  Change A new financial profile for the project was
presented in light of a financial underspend in
financial year 2022/23.
Decision delayed,
more information
required
Feb
2023
MICM E:  Change Due to a lack of certainty on the preferred
site for MAATIC and both parties planning to
co-locate, request for MICM FBC submission
date to be delayed until May 2023.
Approved
Mar
2023
DHI E:  Change  Updated change request submitted following
advancement of Q4 spend and the project
being able to determine a more accurate
profile for 2022/23 spend.
Approved
Mar
2023
BE Hub E:  Change  Request to change the FBC submission date
to the MGD Board to June 2023.
Approved
Apr
2023
EY STEM E:  Change Revised preferred delivery model presented
that is affordable within existing capital and
revenue budget allocations.
Approved
Apr
2023
HMD E:  Change To enable evidence form the Housing
Demand and Need Assessment, proposal to
adjust the FBC submission date to September
2023.
Approved
May
2023
MICM E:  Change Request to decouple the project from
MAATIC regarding site location, with a view
to progressing a preferred location of Forres
Enterprise Park.  Project also requested an
additional 3 months to finalise the FBC.
Approved
Jun
2023
Bus
Revolution
E:  Change Proposal to make a small amendment to the
financial model, moving £19,3500 that was
underspent in financial year 2022/23 into
2023/24.
Approved
Aug
2023
MAATIC C:  FBC
approval
Full Business Case (FBC) submitted for
approval.
Decision delayed,
revised version
required following
Board comments.
Aug
2023
BE Hub C:  FBC
approval
Full Business Case (FBC) submitted for
approval.
Approved
Aug
2023
MICM C:  FBC
approval
Full Business Case (FBC) submitted for
approval.
Approved
Page 147

Page 148

42 
Aug
2023
EY STEM E:  Change Request to change the FBC submission date
from October 2023 to January 2024 to align
with the delivery of outputs from professional
advisors.
Approved
Sept
2023
CQ E:  Change Following dialogue with the Governments,
proposal presented to take a phased
approach to the FBC due to the different
construction horizons for Elgin Town Hall and
Grant Lodge.  FBC submission date changed
to March 2024.
Approved
Sept
2023
MAATIC C:  FBC
approval
Full Business Case (FBC) submitted for
approval.
Approved, but with
revisions to be made
to the document
Sept
2023
HMD C:  FBC
approval
Full Business Case (FBC) submitted for
approval.
Approved
Oct
2023
DHI F:  In-life
review
In depth review of the project, with a focus
on the status of the different living labs.
Approved
Nov
2023
Bus
Revolution
F:  In-life
review
In depth review of the status of the project,
with a focus on data from the first six months
of m.connect services.
Approved
Dec
2023
DHI E:  Change In light of the Rural Centre for Excellence
securing a longer term funding package from
the Scottish Government, request to change
the delivery window of the project by one
year (to 2026) to realise opportunities
associated with the creation of a more
integrated digital solutions.
Approved 
7.3 Audit activity undertaken during 2023
Building on the scrutiny provided by the MGD Board and establishment of an in-life review process
for projects that are in delivery, it’s expected that activity will be the subject of periodic audits.
During the term of this report, the following internal audit activity has been progressed:
▪ Closure of the 2022 Moray Council Internal Audit: Following a 2022 internal audit by  Moray
Council that rated the project’s control of the audit scope as substantial, the Deal was asked
to implement five recommendations. Subsequently, a report1 was presented to the Council’s
Audit and Scrutiny Committee on 22 November 2023 informing members that all of the
recommendations have been successfully closed.  
▪ Digital Health Internal Audit: Scheduled to mark the second anniversary of the project being
in delivery, the University of Strathclyde Internal Audit Service undertook an audit of the
Digital Health project. The scope focused on internal project controls.   
1 Closure report on the 2022 MGD Internal Audit that is available on the Council’s website 
Page 148

Page 149

REPORT TO: MORAY COUNCIL ON 6 MARCH 2024 
SUBJECT: UK GOVERNMENT “OUR LONG-TERM PLAN FOR TOWNS” 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 This report asks Council to nominate  elected members to sit on the Elgin
Town Board and to note progress to establish the Board following the
announcement on 1 October 2023 that Elgin is one of 55 towns in the UK to
receive £20 million funding from the UK Government. 
1.2 This report is submitted to Committee in terms of Section III(A)(2) of the
Council’s Scheme of Administration relating to long-term financial plans. 
2. RECOMMENDATION 
2.1 The Council is asked to: 
(i) Note the progress in establishing an Elgin Town Board before the
deadline of 1 April 2024; 
(ii) Note the guidance in Appendix 1 as to representation on the
Board; 
(iii) Note the appointment of the chair of the Elgin Town Board will be
done in consultation with our MP from those independent
members to be invited to join the board as outlined in Para 4.4 ; 
(iv) Note the proposed initial members of the Board; 
(v) Note the proposed steps and timeline to prepare the 10 year
vision and 3 year Investment Plan; and 
(vi) Agree the nomination of elected members and nominated
substitutes to represent the Council on the Town Board
Item 15.
Page 149

Page 150

3. BACKGROUND 
3.1 The Long –Term Plan for Towns (LTTP) was published on 1 October 2023
and seeks to invest £1.1billion into 55 towns across the UK, including Elgin as
one of seven towns in Scotland to each be awarded £20M. 
3.2 The Plan recognises that through the governments existing programmes and
lessons learned from other countries, the need for longer term funding
certainty, building local partnerships, having a clear plan for delivery, joint
working between central and local government and involving people and
communities from the outset are key to success and have been embedded in
the Plan. 
3.3 A report to Council on 25 October 2023 (para 7 of minute refers) agreed that
the Head of Economic Growth and Development liaises with the UK and
Scottish Governments to progress governance arrangements to establish a
Town Board. 
3.4     Guidance was published on 18 December 2023, extracts relating to
investment themes, Town Board governance and policy interventions are
included in Appendix 1. 
4. PROGRESS 
4.1 An initial informal Steering Group has met to help inform representation on the
Board. The second meeting of the Group will agree representation in line with
the Guidance and Council is asked to agree which elected members will sit on
the Board. It is suggested that in order to maintain political balance on the
group Members may wish to consider the Council Leader and Leader of the
opposition, Members may consider having more than 2 Members on the
board but this should be proportional to the size of the Board. At a recent
webinar, it was suggested that between 2-4 elected members is proportional
to a Board of around 15 members. The Board must be established by 1 April
2024 and will be able to consider Board representation through agreed Terms
of Reference. 
4.2 The Town Board is required to prepare a 10 year vision and a 3 year
Investment Plan by 1 August 2024 and a timeline to draft, engage and finalise
the Plan is set out in para 4.9. Members should note that the Plan is to be
community driven, however where there is a staffing or other cost implication
it is important that this is taken account of. 
4.3 The Town Board is responsible for developing the Long-Term Plan, supported
by the local authority. Town Boards should be chaired by an independent
Chair, invited by the local authority and MP. It is proposed that the Chair will
be chosen in consultation with our MP from the independent Members to be
invited as outlined in para 4.4.
Page 150

Page 151

4.4 Board members must include the local MP, a senior Police representative and
a maximum of two elected members. The Board can include a local MSP. It is
proposed that the following organisations/ individuals are represented on the
Board’s first meeting and they then decide further representation from
community and business, with sub-groups set up to ensure an inclusive
approach is embedded; 
• Angela Norrie, Elgin BID
• Jackie Andrews, Elgin Town Hall for the Community
• Alastair Kennedy, Elgin Community Council
• Police Scotland
• David Patterson, Moray College UHI
• Richard Lochhead MSP
• Douglas Ross MP
• NHS Grampian – representative TBC 
It is proposed that in addition to the Head of Economic Growth and
Development, the Transportation Manager, the Sport and Culture Services
Manager and the Strategic Planning and Development Manager attend the
Board. All officers will be advisers to the Board with no voting rights.
4.5 The Long-Term Plan to be developed will set out a 10 year vision and the 3
year Investment Plan will set out how the funding will be allocated and spent
over the next 3 years. There are three investment themes: safety and security,
high streets, heritage and regeneration and transport and connectivity.
Interventions under these themes have already been assessed as having a
strong case for investment, value for money and benefit to cost ratio and can
be included in the Investment Plan. Any “off menu” interventions will require
an outline business case to be provided. The UK Government will assess
plans as they come in, and release 2024 to 2025 capital and revenue funding
once plans are approved.
4.6 As well as being a member of the Town Board, the Guidance advises that
MPs should be individually involved in reviewing the Long-Term Plan prior to
submission. Each Long-Term Plan must list the MPs involved in the Town
Board and whether each are supportive of the final Long-Term Plan
submitted. Town Boards in Scotland and Wales may also wish to share their
Long-Term Plan with the local MSP, although there is no requirement to do
so.
4.7 While one or more MPs not supporting the Long-Term Plan will not prevent the
UK Government considering it, the government is keen to see broad local
consensus for the interventions put forward.  In the absence of such agreement,
Ministers reserve the right to defer sign off until broad consensus is secured. 
Page 151

Page 152

4.8 The recruitment process for Levelling Up Fund project staff has started,
subject to confirmation of funding, with the aim of establishing a core team for
3 years to be funded through the Levelling Up Fund and the LTTP capacity
funding, working closely with services and other project managers to
maximise outputs and evaluate outcomes. 
4.9 The proposed timeline to develop the 10 year Vision and 3 year Investment
Plan to meet the deadline is; 
• Appointment of project staff - March 2024
• Town Board established - before 1st April 2024
• First Board meeting to agree Terms of Reference, project assessment
criteria, governance and procedures - early April 2024
• Board meeting to consider projects - late April 2024
• Public engagement on projects - May 2024
• Draft Investment Plan considered by Board - June 2024
• Report draft Investment Plan to Council - June 2024
• Finalise Investment Plan and 10 year vision and submit to UK Government
- July 2024 
4.10   Officers are liaising with other local authorities in Scotland on detailed
governance arrangements. 
5 SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Town Centre regeneration is a key element of economic development
which is a priority in the Corporate Plan. The funding could support
employment, training and skills opportunities with regeneration of the
town centre supporting and enhancing the regional role of Elgin as a
place to live, work and invest. 
Projects to support safety and security and transportation projects all
support the Corporate Plan objectives for safer, connected communities. 
A Community Wealth Building Plan will be developed to support the
programme of projects seeking to maximise economic benefit. 
(b) Policy and Legal
The funding could support delivery of the statutory Moray Local
Development Plan 2020 and the Elgin Transport Strategy and Active
Travel Strategy. 
Legal support will be required for any partnership projects, statutory
processes and subsidy control advice may be required as the
programme progresses. 
(c) Financial implications
The £20 million funding is 25% revenue and 75% capital. £50k capacity
funding has already been received from the UK Government with a
further £200k to be released on 1st April 2024. The £50k already
Page 152

Page 153

received will be used towards staffing costs set out in (e) to support the
Board until the Investment Plan is submitted to the UK Government. It
will be up to the Board how the £200k capacity funding is to be used. 
Funding will be released over a 7 year period, and local authorities have
the flexibility to spend it over 10 years. The local authority remains the
accountable body for funding and executing plans. 
Projects included within the Investment Plan may result in increased
maintenance costs for the Council as previously reported and it is
important that projects are designed from the outset to minimise ongoing
costs to the Council and that the Council considers these costs. 
(d) Risk Implications
There are a number of risks and opportunities including; 
•  A risk that the benefits of the £20M are not fully realised or
evaluated- a detailed Monitoring and Evaluation Framework will be
developed for the LTTP and for the much wider programme of
activity including LUF projects and Moray Growth Deal projects. 
•  A risk that projects are not shovel ready- a project mandate will be
prepared for all potential projects to be included in the Investment
Plan and these will be scrutinised by the Board to ensure
deliverable projects are included. 
•  A risk regarding inflation and construction costs, which will continue
to be reflected in updated cost for projects including high optimism
bias levels. 
•  A risk that the public are not engaged in the project- this will be
managed through a strong and active Communications and
Engagement Plan with dedicated 0.5 FTE staff resource funded
through LUF and Moray Economic Partnership media budget. The
local press have been very supportive and active on town centre
regeneration projects and a partnership approach to
communications and engagement will be key to keeping everyone
informed and engaged as projects progress. 
•  An opportunity through the Moray Growth Deal, LUF and LTTP to
develop and deliver a transformative programme of projects in
Elgin. A joint approach to benefits realisation, monitoring and
evaluation, Community Wealth Building and net zero will be
promoted across the programme. 
(e) Staffing Implications
Project management staff are being recruited to support and deliver the
LUF projects and initial support for LTTP. This consists of a grade 11
Senior Project Manager and a 0.5FTE Project Officer, both 2 year
contracts. In addition to this a 0.5 FTE Communications Officer post will
be created to cover strategic economic growth projects, funded through
Moray Economic Partnership media budget and LUF, also for 2 years.
Page 153

Page 154

Existing staff within Strategic Planning and Development, Community
Support Unit, Transportation and Consultancy will continue to progress
and deliver projects as part of their duties in delivering the Moray Local
Development Plan 2020, Locality Plans, the ECCMP, Active Travel
Strategy, Elgin Transportation Strategy, Surface Water Management
Plan and their input and expertise will be required to develop details of
projects. Sub groups are likely to be set up to develop and consider
projects within the investment themes and Council officers time will be
required to support this. 
It is proposed that the Head of Economic Growth and Development will
attend the Board, supported by the Transportation Manager, Sport and
Culture Service Manager and Strategic Planning and Development
Manager. All officers will attend in an advisory capacity with no voting
rights. 
The Investment Plan will have implications for Council services in
administering the Funds, such as legal, finance and procurement and
costs should be reimbursed through the capacity and revenue element of
the funding. 
(f) Property
None at this stage, however, Council owned property within the Town
may be included within the Investment Plan. 
(g) Equalities/Socio Economic Impact
The funding aims to support town centre regeneration and address
economic disadvantage and in doing so, provide safer, more inclusive
and accessible places. 
An Equalities/ Socio Economic Impact Assessment will be undertaken on
the Investment Plan. 
(h) Climate Change and Biodiversity Impacts
Climate Change officers will be consulted on relevant projects within the
Investment Plan and will also have the opportunity to propose projects
for consideration by the Board. Projects within the themes are likely to
offer significant opportunities to reduce carbon and enhance biodiversity. 
(i) Consultations
The Depute Chief Executive (Economy, Environment and Finance), 
Head of Economic Growth and Development, Head of Governance,
Strategy and Performance, Chief Financial Officer, Democratic Services
Manager, Principal Climate Change Officer, Consultancy Manager, Sport
and Culture Services Manager, Transportation Manager, Senior
Engineer (Transportation), Senior Communications Officer and the
Equalities Officer have been consulted and comments received have
been incorporated into the report. 
Page 154

Page 155

6. CONCLUSION 
6.1  The UK Government published “Our Long- Term Plan for Towns” which
includes Elgin as one of 55 towns in the UK to receive £20M funding
towards issues that matter most to local people, including high streets,
heritage and regeneration, public safety and security and transportation. 
6.2  The Plan requires the Council to set up a Town Board by 1 April 2024
and prepare a 3 year Investment Plan by 1 August 2024. 
6.3  Work has progressed to establish the Board and this report asks
Council to agree 2 elected members to represent the Council on the
Board. 
Author of Report: Gary Templeton, Strategic Planning and Development Manager
Background Papers: 
Ref:  SPMAN-813460984-479 / SPMAN-813460984-480
Page 155

Page 156

Page 156

Page 157

Appendix 1- Investment themes, Town Board governance and policy
interventions- Extracts from UK Government Guidance 
The 3 investment themes
Towns across the UK will identify the measures that matter most to local people. By
including a policy toolkit, a list of interventions and providing the opportunity for Town
Boards to take bespoke, ‘off-menu’ approaches where such an approach can be
justified, we are providing significant flexibility to tailor the Long-Term Plan across
the 3 broad investment themes. There is no requirement as to how towns utilise the
funding across the 3 themes. But we would expect to see at least one intervention
per theme covered in the Long-Term Plan, unless towns justify an alternate
approach.
Safety and security
Tackling crime and anti-social behaviour is a priority for turning around local areas
and ensuring business can thrive. It is impossible to level up a town if people do not
feel safe to go into the town centre. Towns that feel unsafe:
• drive away shoppers
• deter investors
• undermine the norms and behaviour that underpin a thriving society
The increase in shop vacancy rate and decrease in footfall has resulted in high
streets becoming prime locations for anti-social behaviour, diminishing pride in place.
The Anti-Social Behaviour (ASB) Action Plan launched this year in England and
Wales, to make our streets safer and treat anti-social behaviour with the urgency it
deserves. To support this, towns can use the funding provided through the Long-
Term Plan for Towns to help reduce crime and improve safety in the local area.
Interventions and the use of powers could include:
• new and improved security infrastructure, such as CCTV and streetlights
• additional hotspot policing
• local authority wardens
Recognising the scope for potential overlap between the role of the Town Board and
a Community Safety Partnership (CSP), in England and Wales, who in some
instances may already be carrying out interventions such as this, we encourage
Town Boards to proactively engage with the relevant CSP in their town to ensure a
consistent approach and avoid duplication. See the Home Office’s guidance on
CSPs for more information.
Item 15.
Page 157

Page 158

High streets, heritage and regeneration
As research from More in Common and Power to Change has found, ‘for many
people, nothing epitomises local neglect more than the state of their local high
street’. Since the 1960s, our high streets have centred around retail, however,
increasing overhead costs, an oversupply of retail space, the growth of out-of-town
shopping centres and online shopping have created a challenging local retail
environment.
A hollowing out of high streets and town centres can affect the liveability of a place.
This makes it less attractive for, and harder to retain, skilled workers, often resulting
in towns having an older population and creating an economic environment that
exacerbates these demographic challenges. 
To ensure they remain the beating heart of our towns and can offer opportunities to
local people, traditional high streets need help to adapt and diversify their offer.
Towns can use this funding to enhance their town centres, making them and their
buildings more attractive and accessible to residents, businesses, and visitors.
Interventions and the use of powers could include:
• preserving and improving heritage sites in the town
• creating and maintaining parks and green spaces
• establishing Business Improvement Districts
• running high street rental auctions.
Transport and connectivity
The ease with which residents can access high streets, jobs and local shopping
centres is critical if towns are to thrive into the future. This means offering transport
options, such as:
• linking different parts of the town with new infrastructure
• providing safe ways for people can walk or cycle into the centre
• ensuring public transport options are viable and accessible.
While improving transport connectivity is a critical component of levelling up, it alone
will not turn around the economic fortunes of a place. Investment will need to be
used alongside other themes, particularly safety and security, to ensure that
transport options are seen as attractive and safe. Used well, this funding could make
towns more connected and easier to find good quality and affordable parking -
increasing footfall and viability – to high streets and local shopping centres, and
accessibility to local employment opportunities.
Interventions and the use of powers could include:
• new infrastructure schemes
• road improvements, such as fixing potholes or improving congested
junctions
Page 158

Page 159

• new programmes to encourage cycling
• making the town centre more walkable and accessible
Annex A: Town Board governance requirements
1. Transparency
In line with the principles of public life, the operations of the Town Board must be
transparent.
The Town Board should publish membership and governance arrangements
(including minutes of meetings and decision logs) on the lead council’s website.
We expect Town Boards to meet quarterly and to publish:
• a documented decision-making process outlining the voting rights of the
board
• profiles of board members
• all board papers in advance of the meeting within 5 working days
• draft minutes of meetings following the meeting within 10 working days
• final minutes, once approved by the board within 10 working days
• any conflicts of interest reported, within the published minutes
Town Boards should follow lead council governance and finance arrangements when
considering private reports, with the default position being that all papers are open to
the public.
2. Code of conduct
All Town Board members should sign up to a code of conduct based on the Seven
Principles of Public Life (the Nolan Principles).
There should be clear processes for managing conflicts of interests (both
commercial, actual, and potential) in decision making, which apply to all involved
with the work of the Town Board.
3. Declaration of interests
The lead council should provide guidance on:
• the financial and non-financial interests individuals must declare
• the process Town Board members must follow for declaring interests
• the process for requesting an exemption
Page 159

Page 160

Town Board members must then complete a declaration of interests, which the lead
council will then hold. This can be in a format the lead council already uses.
Town Board members are responsible for declaring their interests before the Town
Board considers any decisions. The lead council must record:
• actions taken in response to any declared interest
• any gifts or hospitality given to the Town Board or individual members
Annex C: List of policy interventions
We encourage Town Boards to engage communities and review the interventions
below. They should submit the most appropriate interventions as part of their Long-
Term Plan, following the above guidance. The case for support for the interventions
has already been agreed, simplifying the Long-Term Plan process.
The interventions are flexible so places can focus on what best meets their local
needs. Town Boards should consider how they can implement interventions to suit
local characteristics, reflecting the opportunities and challenges that their
communities face.
Town Boards can also take forward interventions outside of this list if they submit an
outline business case to DLUHC as part of their Long-Term Plan. This should be
based on numeric evidence where possible.
Safety and security interventions
S1: Design and management of the built and landscaped environment to ‘design out
crime’. This might include:
• promoting the active use of streets and public spaces throughout the
daytime and evening
• improvements to streetlighting
• installation of new CCTV
S2: Engage with Police Force and together consider interventions to focus on visible
crime prevention in defined areas places. Interventions could include:
• hotspot policing
• problem-oriented policing
Page 160

Page 161

S3: Measures to prevent anti-social behaviour, crime and reduce reoffending. These
might include:
• sports programmes designed to prevent crime and reduce reoffending
• mentoring
• police-led pre-charge diversion models for young offenders
• focused deterrence strategies
• halfway house programmes
S4: Measures to reduce repeat burglary. These might include: 
• Neighbourhood Watch
• provision of crime prevention advice
• property marking
• target hardening (increasing the security of a property)
• cocoon watch (provision of crime prevention advice, support and guidance
to neighbours and surrounding addresses of burgled properties)
• alley gating
High streets, heritage and regeneration interventions
H1: Funding for place-based regeneration and town centre and high street
improvements, which could include better accessibility for disabled people, including
capital spend and running costs. This might include:
• regenerating a town square or high street
• public realm improvements, for example street furniture or other decorative
improvements
• the delivery of outreach, engagement and participatory programmes for
community spaces, including youth centres and public libraries
H2: Funding for new or improvements to existing, community and neighbourhood
infrastructure projects and assets including those that increase communities’
resilience to natural hazards, such as flooding, and support for decarbonisation of
facilities, energy efficiency audits, and installation of energy efficiency and renewable
measures in community buildings (including capital spend and running costs). This
might include:
• building new or updating existing defences to increase communities’
resilience to natural hazards like flooding or costal erosion
H3: Creation of and improvement to local green spaces, community gardens,
watercourses and embankments. Improvements to the natural environment and the
Page 161

Page 162

incorporation of more of these natural features into wider public spaces. This might
include:
• development of a new park, particularly in areas with the least access to
greenspace
• development of a new park or community garden
• improvements to a canal towpath, particularly in more deprived
neighbourhoods
• urban or riparian tree planting
• changes to management of green spaces and verges
• regeneration of existing parks or community gardens, particularly in areas
with poor quality parks and gardens
• improving access to existing parks
H4: Enhanced support for arts, cultural, heritage and creative activities, projects and
facilities and historic institutions that make up the local cultural heritage offer. This
might include:  
• the delivery of events programmes for community spaces, including youth
centres and public libraries
• the development, restoration or refurbishment of local natural, cultural and
heritage assets and sites
H5: Support for local arts, cultural, heritage and creative activities. This might
include:
• funding for maker spaces
• funding for local art galleries, museums, libraries for exhibitions
• support for displays for artists to showcase work
• locally led music and theatre performances, tours, author events and film
screenings
• funding for cultural, heritage and creative events
• support for outreach, engagement, participatory programmes as part of
wider local arts, cultural, heritage and creative activities
• support for the establishment and development of cultural, heritage
collaborative networks to share knowledge locally
H6: Funding for the development and promotion of wider campaigns which
encourage people to visit and explore the local area. This might include:
• campaigns promoting the local area and its culture, heritage, leisure and
visitor offer to residents and visitors
• campaigns to encourage visitors from further afield to visit and stay in the
region, collaborating with other places where appropriate
Page 162

Page 163

H7: Funding for impactful volunteering and social action projects to develop social
and human capital in local places. This might include:  
• funding for local volunteering groups, such as youth charities and carer’s
groups
• support for people to develop volunteering and social action projects locally
H8: Funding for local sports facilities, tournaments, teams and leagues; to bring
people together. This might include:
• renovation and maintenance of existing sports facilities
• support for community sports leagues
• regeneration of an unused area to build sports facilities
• creation of new 3G sports pitches and other sports facilities
H9: Investment in capacity building, resilience (which could include climate change
resilience) and infrastructure support for local civil society and community groups.
This might include:
• funding for community spaces, such as village halls, libraries or community
centres for local civil society and community groups to use
• support for people to develop volunteering and social action projects locally
H10: Investment and support for digital infrastructure for local community facilities.
H11: Investment in open markets and improvements to town centre retail and service
sector infrastructure, with wrap around support for small businesses. This might
include:
• funding to support the establishment and ongoing running of a new open
air market
• business support activity for entrepreneurs
H12: Funding for the development and promotion (both trade and consumer) of the
visitor economy, such as local attractions, trails, tours and tourism products more
generally. This might include:
• development of local visitor trails and tours
• grants for the development, promotion and upkeep of local tourist
attractions
• development of other local visitor experiences based around the local offer
H13: Grants to help places bid for and host international business events and
conferences that support wider local growth sectors. This might include:
• grants to bid for, secure and hold a conference for a leading sector locally
Page 163

Page 164

Transport and connectivity interventions
T1: Support for active travel enhancements in the local area. This might include:  
• creation of new foot paths and cycle paths, particularly in areas of health
need or social inequalities
• upgrading of existing foot paths and cycle paths, particularly in areas of
health need or social inequalities
T2: Funding for bus infrastructure and connections to speed up journeys. This might
include: 
• traffic signalling improvements
• bus lanes and corridors
• improved passenger information
T3: England and Scotland Only: Additional revenue funding added to the Bus
Service Improvement Programme Plus (BSIP+) funding model from June 2024 - that
would award funding to LTAs based on a connectivity scoring so they could
undertake activities that would boost economic growth. 
T4: Funding for new, or improvements to road networks to improve access within
and to the town. This might include:  
• traffic management improvements to relieve congestion
• road safety
• highway maintenance (including potholes)
T5: Funding to improve rail connectivity and access. This might include:
• adding stations along existing lines
• improved accessibility and journey quality at and around stations
• improved passenger information
T6: Reducing vehicle emissions. This might include: 
• EV charging facilities
• procuring zero emission buses
T7: Investment and support for digital infrastructure for local community facilities. 
Ref: SPMAN-813460984-480 
Page 164

Page 165

Page 165

Page 166

Page 166

Page 167

REPORT TO: MORAY COUNCIL ON 6 MARCH 2023 
SUBJECT: REVIEW OF COUNCIL’S STANDING ORDERS 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To invite the Council to consider the timescale for changes to the Council’s
Standing Orders as detailed in Section 4 of the report. 
1.2 This report is submitted to Council in terms of Section II (15) of the Council's
Administrative Scheme relating to the formulation, review and amendment of
the Administrative Scheme and Standing Orders which provides that
amendments to Standing Orders require to be raised at one Council meeting
for approval at the following meeting. 
2. RECOMMENDATION 
2.1 It is recommended that the Council: 
i) consider the options for material changes to Standing Orders for
each of the areas set out in paragraph 4.1 below/ Appendix 1 and
determine how to proceed in each case; 
ii) agree the proposed minor changes to Standing Orders set  out in
paragraph 4.2 below/ Appendix 2; 
iii) note that a final version of the Standard Orders, incorporating the
agreed position from recommendations (i) and (ii) above, will be
submitted to the next ordinary meeting of the Council; and 
iv) agree to defer the wider annual review of the Scheme of
Administration and Scheme of Delegation from May 2024 until
December 2024 to bring the reviews back in line with the annual
Standing Order Review.  
Item 16.
Page 167

Page 168

3. BACKGROUND 
3.1  In terms of Standing Order 90 the Council is required, at least once every 
year, to review the standing orders to determine whether any alteration should 
be considered. 
3.2 The last review was carried out and agreed at a meeting of Moray Council on
28 September 2022 (para 11 of the minute refers). 
3.3 Recommendations were considered by the Council’s Corporate Committee on
4 October 2023 in relation to strengthening collaborative leadership within the
Council (paragraph 6 of the minute refers). Some of these recommendations
impact on how the Council conducts its committee business and would require
amendments to the Council’s Standing Orders. The areas for consideration
are detailed in paragraph 4 below. 
3.4 A survey was carried out with other local authorities to see what their standard
practice was in relation to approval of minutes, whether these were approved
by committee, the full Council or both.  13 responses were received and the
results detailed in the final column of Appendix 1. 
4. PROPOSALS 
4.1 Material Changes 
A number of options have been identified in the table in Appendix 1 to
consider whether there may be a more efficient way of dealing with the
processes identified. Recommendations (shown in bold in the first column of
the table and following the same numbering) as are as follows: 
A    Approval of committee minutes 
Option 1: Continue current practice where committees approve their own
minutes and these are published, but not presented to full Council. 
B   Questions on minutes
Option 3: Encourage questions on content to be raised without the need
for committee procedure and require any remaining questions to be
submitted under Written Question procedure. 
C   Reading out responses to Written Questions 
Option 2: Cease practice of reading out responses. Continue publication. 
D    Remove Open Question Time
Option 2: Remove open Question Time from all meetings and require all
questions to be put in writing. 
E    Information reports
Option 1: Continue Current arrangements which require Information
Reports to be called in (subject to timing clarity set out in paragraph 4.2
below).   
Page 168

Page 169

4.2 Minor changes
In addition to the material changes detailed above a number of minute
changes are proposed for consideration. Appendix 2 contains a tracked
change version of the Standing Orders with these changes. 
SO No Amendment Reason
35 (c) Inclusion of table to confirm
deadlines for Notices of
Motion
To make deadlines clearer
36 Inclusion of table to confirm
deadlines for Written
Questions
To make deadlines clearer
38 Clarification of timescale for
call in of Information reports
Existing wording unclear
38 Inclusion of ‘of the
Committee’
Following an issue at ECLS
Committee it was agreed that
the proposer and seconder for
the calling in Information
reports should sit on the
Committee.
71 Standing Order referred to
in paragraph should be 70
and not 72
Amendment to Standing
Order referred to in paragraph
76 Changes to Committee
Membership
It was agreed that changes to
Committee Membership could
be submitted by the Group
Leaders. 
4.3 Scheme of Administration and Scheme of Delegation
At the meeting of Moray Council on 24 May 2023 updates to the Scheme of
Administration and Scheme of Delegation were agreed (para 14 and 16 of the
minute refers).  The next review for these documents should be May 2024,
however to bring the reviews back in line with the next Standing Order review
it is proposed to delay the next wider review until December 2024.   
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Effective governance arrangements are key to the development and
delivery of the Council’s stated priorities and plans. 
(b) Policy and Legal
Provision of Standing Orders ensures that the Council’s affairs are
administered in accordance with the law, propriety and proper standards. 
(c) Financial implications
None. 
(d) Risk Implications
Updated constitutional documents help to promote good governance and
reduce the chance of a successful challenge to Council decisions.
Page 169

Page 170

(e) Staffing Implications
The proposed amendments can be accommodated within existing staff
resources. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
There are no direct impacts as the Council’s constitutional documents
regulate the Council’s internal procedures only. 
(h) Climate Change and Biodiversity Impacts
None. 
(i) Consultations
The Chief Executive, Depute Chief Executive (Economy, Environment
and Finance), Depute Chief Executive (Education, Communities and
Organisational Development and the Head of Governance, Strategy and
Performance have been consulted and any comments have been
included in the report. 
6. CONCLUSION 
6.1 The annual review of the Council’s constitutional documents has
resulted in a number of changes being identified and the Standing
Orders, have been redrafted accordingly.  The Council is asked to
approve the amendments. 
Author of Report: Head of Governance, Strategy and Performance and
Democratic Services Manager 
Background Papers: 
Ref: 
Page 170

Page 171

Appendix 1 – Options for material changes to Standing Orders 
A: Should committee minute be approved at Full Council?  Standing Order 32
Option
Rec.
in bold 
Pros  Cons  What do other Councils  do?
1 Each committee
approves its own
minutes 
It is just those who were at the
meeting that consider the
minute 
Minutes are available online
for all councillors to read. 
Keeps full Council strategic
Work of committees less
visible to non-committee
members. 
Most Councils have a system
where Committees approve their
own minutes. 
Some have an additional layer
where Committee minutes then
go to full Council. 
Some operate a hybrid.  2 All committee
minutes go to Full
Council after
committee approval 
Greater visibility of committee
business to all Councillors
Extra paperwork and
potential to lengthen full
council meetings
3 Committee minutes
go straight to full
Council for approval
Council used to do this. 
All 26 councillors get to see
what is going on in each
committee
Questionable under
legislation which suggests
that council committees
should approve their own
minutes. 
Councillors who weren’t at
meetings are not able to
comment on accuracy 
Could add significant length
to Council meeting times.
Item 16.
Page 171

Page 172

Page 172

Page 173

B: Questions on Minutes – Standing Order 32
Option  Pros  Cons  What do other Councils  do?
1 Current practice: 
Points of accuracy at
beginning of meeting. 
Questions on content
at end of meeting. 
Helps council meetings to
proceed to consider
substantive business 
Can lead to confusion in
separating out questions.
With notice just being given
at the meeting specific
officers are often not
available or unable to
prepare for questions later
in the same meeting
Some councils require points of
accuracy to be raised in advance
of the meeting.
The majority of Councils who
responded do not allow open
questions on content of minutes. 
Some require them to be raised
in writing in advance of meeting
and some at the discretion of the
Chair.
2 Require points of
accuracy to be
submitted in writing
advance of meeting
Gives fair notice and allows
careful consideration of
wording in what is often a
contentious issue.
Limited time after
publication of papers for
councillors to spot issues. 
3 Encourage questions
on content to be
raised without the need
for committee
procedure. 
Require any remaining
questions on content
to be submitted under
Written Question
procedure.
More efficient use of
committee time. 
Gives fair notice. 
Encourages answers to be
sought without the need for
committee time to be taken
up.
Would not work for
spontaneous questions. 
Limited time before a
meeting for members to
raise questions
Page 173

Page 174

Page 174

Page 175

C:  Reading out responses to Written Questions – Standing Order 36
Option  Pros  Cons  What do other Councils  do?
1 Retain current position
where responses to
Written Questions are
read aloud by clerk as
well as published on
CMIS
Helpful for those watching
online 
Inefficient use of committee
time
No responses available
2 Publish Responses
only (not read out). 
Allows committee time to
focus on the substantive
agenda. 
Could still allow a follow up
question to give “air time” to
requestor. 
Response can be published
online for viewing. 
May be harder for people
watching online to follow the
thread. 
Page 175

Page 176

D: Remove open Question time at the end of meetings – Standing Order 41/42
Option  Pros  Cons  What do other Councils do?
1 Continue current
arrangements for
agenda to include open
questions to the chair
time at the end of each
meeting. 
Seen by councillors as a
useful means to raise
constituency concerns in
public
Inconsistent with good
decision making principle of
fair notice. 
Effectively AOCB. 
Questions are often
addressed to officers who
are either unavailable or
unable to provide an answer
due to short notice. 
Appears to be unique to Moray
and does not feature in any
Councils’ committee procedures. 
2 Remove open question
time altogether – rely
on existing Written
Question procedure
Better quality of responses. 
Fair notice allows for a
more structured response to
be given. 
Allows committee time to be
focused on agenda items
Seen by councillors as a
useful means to raise
constituency concerns in
public 
Page 176

Page 177

E: Consider whether to retain Information report section in committees– Standing Order 38.
Option  Pros  Cons  What do other Councils do?
1 Continue current
arrangements where
information reports are
published with the
agenda papers but are
not open for debate. 
Opportunity for these to
be called in. 
Helps to focus committee
time on issues where a
decision is required. 
More in depth discussion
can take place in offline
briefing sessions.
Can be seen as stifling
debate. 
No responses available
2 Revert to previous
position where reports
for noting appeared on
agendas. 
Gives opportunity for
Councillors to discuss
issues in a public forum.
Significant amounts of
Committee time taken up is
discussion with no resulting
decision. 
Motions could be brought
forward although not ideal
from fair notice perspective. 
Page 177

Page 178

Page 178

Page 179

Approved by Moray Council on 28 September 2022
Review due: December 2023March 2024
Responsible Officer: Head of Governance, Strategy and Performance 
MORAY COUNCIL 
CONSTITUTIONAL DOCUMENTS 
1. STANDING ORDERS
for the regulation of Council meetings
[Under schedule 7 para 8 of the Local Government (Scotland) Act 1973] 
Item 16.
Page 179

Page 180

2 
STANDING ORDERS OF MORAY COUNCIL 
REGULATION OF MEETINGS 
CONTENTS 
ORDER
NUMBER 
PAGE
1 APPLICATION OF INTERPRETATION ACT 3
2 COMMENCEMENT 3
3 DEFINITIONS 3
4 - 5 FIRST MEETINGS OF THE COUNCIL AFTER ELECTIONS 4
6 - 8 CHAIR 4
9 - 14 CALLING MEETINGS 5
15 - 20 QUORUM 6
21 - 22 DECLARATION OF GROUP DECISIONS 6
23 - 24 DECLARATION OF FINANCIAL AND OTHER INTERESTS 7
25 - 28 ADJOURNMENT OF MEETING 7
29 - 31 ORDER OF BUSINESS 7
32 - 34 APPROVAL OF MINUTES 8
35 NOTICES OF MOTION 8
36 - 37 WRITTEN QUESTIONS 9
38 INFORMATION REPORTS – CALL IN 9
39 - 40  PETITIONS 9
41 - 42 QUESTION TIME 10
43 - 52 MOTIONS AND AMENDMENTS 10
53 - 57 ORDER OF DEBATE 11
58 - 61 POINTS OF ORDER 11
62- 64 CLOSURE OF DEBATE 12
65 - 66 VOTING PROCEDURES 12
67 - 69 DISSENT 14
70 - 73 ADMISSION OF PRESS AND PUBLIC 14
74 - 78 COMMITTEES 15
79 OBSTRUCTIVE AND OFFENSIVE CONDUCT 15
80 COUNCILLORS CODE OF CONDUCT 16
81 APPLICATION OF STANDING ORDERS TO COMMITTEES 16
82 QUESTIONS OF PROCEDURE 16
83 SUPPLY OR DISPOSAL OF GOODS AND EXECUTION OF
WORK CONTRACTS
16
84 ALTERATION OF RESCISSION OF PREVIOUS RESOLUTION 17
85 - 87 SUSPENSION, ALTERATION AND REVIEW OF STANDING
ORDERS ETC
17 
Page 180

Page 181

3 
MORAY COUNCIL
STANDING ORDERS 
For the Regulation of the Business of The Moray Council, made in terms of Paragraph 8 of
Schedule 7 to the Local Government (Scotland) Act 1973 (hereinafter referred to as “the
Act”). 
APPLICATION OF INTERPRETATION ACT 
1. The Interpretation Act 1978 applies to the interpretation of these Standing Orders
as it applies to the interpretation of an Act of Parliament. 
COMMENCEMENT 
2. These Standing Orders shall apply and have effect from 27 October 2022. 
DEFINITIONS 
3. In these Standing Orders, the following words and expressions shall have the
meanings hereinafter respectively assigned to them, that is to say - 
“the 1973 Act" means the Local Government (Scotland) Act 1973 
"the 1989 Act" means the Local Government and Housing Act 1989 
"the 1994 Act" means the Local Government etc. (Scotland) Act 1994 
“Leader” shall be the role described in section 4(1) of the 1994 Act, being the first
role which requires to be filled by the Council following an election. The role is
further described in the complementary Council governance document “Councillors’
Roles and Responsibilities”. 
“Depute Leader” shall be the role described in section 4(2) of the 1994 Act, The role
is further described in the complementary Council governance document
“Councillors’ Roles and Responsibilities”. 
“Civic Leader” shall be the civic and ceremonial role described in the
complementary Council governance document “Councillors’ Roles and
Responsibilities” 
"Council" means The Moray Council incorporated under the 1994 Act 
"Councillor" means a Member of the Council duly elected at an election or by-
election or duly elected to fill a Council vacancy and who has made a declaration of
acceptance of office in terms of section 33A of the 1973 Act 
"Proper Officer" means such persons designated as such and for the purpose
specified by the Council 
"Member" means in relation to the Council, a councillor and in relation to any
Committee or Sub-Committee a person appointed as a member of that Committee
or Sub-Committee whether or not entitled to vote 
"Head of Paid Service" means the person designated as such by the Council under
Section 4 of the 1989 Act
Page 181

Page 182

4 
"Monitoring Officer" means the person designated as such by the Council under
Section 5 of the 1989 Act or, if that person is unable to act owing to absence or
illness, the person nominated by him or her as his or her deputy under sub-section
(7) of that Section 
"Chief Financial Officer" means the person designated by the Council for the
purpose of Section 95 of the 1973 Act 
"Chief Officer" means a statutory or non-statutory Chief Officer, as defined in
Section 2 of the 1989 Act 
"point of order" means any objections submitted to the Leader for decision relating
to the conduct of the meeting i.e. an alleged breach of a Standing Order. 
"Councillors Code of Conduct" means the Councillors’ Code of Conduct made by
Scottish Ministers under the Ethical Standards Public Life (Scotland) Act 2000. 
ARRANGEMENTS FOR MEETINGS OF THE COUNCIL 
FIRST MEETINGS OF THE COUNCIL AFTER ELECTIONS 
4. The first meeting of the Council after any ordinary election of Councillors shall be
held within 21 days from the date of the election. 
5. At the first meeting of the Council after the election, the Council shall deal with the
business in the following order:- 
(a) Note election of councillors. 
(b) Take the sederunt, noting which councillors have executed the declaration of
acceptance of office. 
(c) Elect the Leader of the Council. 
(d) Elect the Depute Leader of the Council. 
(e) Elect the Civic Leader of the Council 
(f) Appoint the Chairs and Members of Committees. 
(g) Appoint Members of the Moray Licensing Board. 
(h) Other statutory or competent business. 
CHAIR 
6. (a) At meetings of the Council, the Leader or, in their absence, the Depute Leader
shall preside.  If the Leader and Depute Leader are both absent from a
meeting, the most senior Officer in attendance shall call on the Members of the
Council to choose a Member to preside. 
Page 182

Page 183

5 
(b) The Leader of the Council, upon being elected, shall - subject to the provisions
of Paragraph 7 of Schedule 2 to the 1994 Act - hold office until the next
ordinary election or until ceasing to be a councillor, whichever is the earlier. 
(c) Notwithstanding the foregoing provisions, the Council may specify a shorter
period for the term of office of Leader, at the time of that election. 
7. Notwithstanding the provisions of the foregoing Standing Order, the Council may
effect the early removal from office of the Leader providing:- 
(a) prior notice to that effect is given at one meeting of the Council on the basis
that the matter would be considered at the next meeting of the Council, or 
(b) where no such prior notice is given, not less than two-thirds of councillors
present and entitled to vote at a meeting agree that the early removal from
office of the Leader be considered at that meeting. 
8. The provision of Standing Order 7 relating to the early removal from office of the
person elected as Leader shall apply in like manner to the post of Depute Leader. 
CALLING MEETINGS 
9. Meetings of the Council shall be held on the days at the times and in the places
fixed by the Council or at such place and time as may be otherwise specified by the
Leader in consultation with the Chief Executive/relevant Depute Chief Executive. 
10. Meetings may held by online participation, or a combination of physical presence
and online participation, in accordance with policy agreed by the Council and
relevant legislation. 
11. Notice of the place and time of a meeting of the Council should, where possible, be
given by the Proper Officer not later than the seventh day before the meeting by
being left at or sent by post to the usual place of residence of every Member of the
Council or such other arrangements as may be agreed from time to time between
the Member and the Proper Officer providing that where it appears to the Leader
that an item of business demands special urgency a meeting of the Council may be
called by the Proper Officer at shorter notice, but in any event by intimation to the
Members as soon as possible prior to the date for the meeting. 
12. A special meeting of the Council shall be called by the Proper Officer (a) at any time
on being required so to do by the Leader or (b) on receiving a requisition in writing
for that purpose specifying the business proposed to be transacted at the meeting
signed by at least seven of the whole number of Members of the Council, which
meeting shall be held within fourteen days of receipt of the requisition by the Proper
Officer. 
13. Notice of the time and place of the meeting shall be published by posting details on
the Council’s website at least three clear days (excluding Saturdays and Sundays)
before the meeting or, if the meeting is convened at shorter notice, then at the time
it is convened. 
14. An item of business may not be considered at a meeting of the Council unless
either:- 
Page 183

Page 184

6 
(a) a copy of the agenda including the item (or copy of the item subject to
exclusion as provided for in terms of Section 50B (2) of the 1973 Act) is open
to inspection by members of the public either electronically or at the offices of
the Council for at least three clear days before the meeting excluding
Saturdays and Sundays or, where the meeting is convened at shorter notice,
from the time the meeting is convened, or 
(b) by reason of special circumstances, which shall be specified in the minutes,
the Leader is of the opinion that the item should be considered at the meeting
as a matter of urgency. 
QUORUM 
15. Subject to Standing Order 16, no business shall be transacted at a meeting of the
Council unless at least one quarter of the whole number of Members of the Council
(being twenty-six) are present. 
16. Where there are at the same time vacancies in respect of more than two Members
of the Council, then until the number of Members in office is increased to twenty six
Members of the Council, the quorum of the Council shall be determined by
reference to the number of Members of the Council, instead of by reference to the
whole number of Members of the Council so however that the quorum shall never
be less than five Members. 
17. Subject to the provisions of the 1973 Act, no item of business shall be transacted at
a meeting of the Council if, in consequence of the provisions of Section 38 of that
Act (disability of Members for voting on account of interest in contracts etc.), less
than a quorum of the Council are entitled to vote on that item. 
18. If within ten minutes after the time appointed for a meeting of the Council a quorum
be not present the Leader shall adjourn the meeting to a time they may then or
afterwards fix and, in the event of the Leader being among those absent, the
Committee Clerk shall minute that owing to the lack of the necessary quorum no
business was transacted. 
19. If, during any meeting of the Council, a quorum is not present, the Leader shall
direct that the meeting be adjourned for 10 minutes and if, after a lapse of 10
minutes, the Leader shall find that there is not a quorum present, the meeting shall
thereupon terminate; but if, before or upon the lapse of the said 10 minutes, a
quorum is present, the Leader shall direct that the business of the meeting be
forthwith resumed.   
20. For the avoidance of doubt, no business shall be transacted at a meeting of a
Committee or of a Sub-Committee unless at least one-fourth of the whole number of
Members or three Members (whichever is the greater) of the Committee or of the
Sub-Committee (as the case may be) are present. 
DECLARATION OF GROUP DECISIONS 
21. Any individual or political group shall declare at the beginning of a meeting whether
a prior decision has been reached on how the individual or Members of the group
will vote on any item(s) of business on the Agenda, and if so on which item(s).  A
prior decision shall be one that the individual or the group deems to be mandatory
Page 184

Page 185

7 
on the individual or the group members such that the individual or the group
members will be subject to sanctions should they not vote in accordance with the
prior decision.  Any such prior decisions will be recorded in the Minute of the
meeting. 
22. The Leader shall seek such declarations from individuals, group leaders or
spokespersons at the beginning of the meeting immediately following the sederunt
(roll call). 
DECLARATION OF FINANCIAL AND OTHER INTERESTS 
23. A Member who is present at the meeting where any item of business in which they
have any financial or other interest (such as described in the Councillors’ Code of
Conduct) is to be dealt with, shall disclose their interest as soon as possible after
the start of the meeting. 
24. The Leader shall seek such declarations at the beginning of the meeting
immediately following the sederunt (roll call). 
ADJOURNMENT OF MEETING 
25. The Leader shall be entitled, in the event of disorder arising at any meeting of the
Council, to adjourn the meeting to a time he/she may then or afterwards fix. 
26. The Council may, at any of their meetings as a Council, adjourn the same to such
time as the Leader may then or afterwards fix. 
27. A motion for the adjournment of the meeting may be made at any time (not being in
the course of a speech) and shall have precedence over all other motions.  It shall
be moved and seconded without speeches or discussions and shall be put at once
to the meeting by the Leader.   
28. When an adjourned meeting is resumed, proceedings shall (subject to the
discretion given to the Leader under Standing Order No. 26) be commenced at the
point at which they were broken off at the adjournment. 
ORDER OF BUSINESS 
29. The business an ordinary meeting of the Council shall proceed in the order
specified in the notice calling the meeting except that any item of business may, at
the discretion of the Leader, be taken out of its order and provided that the Council
may adjourn a meeting of the Council to any other day, hour and place.  The order
in the notice shall, unless circumstances otherwise require, be as follows:- 
(a) Chair to be taken 
(b) Sederunt 
(c) Declaration of Group Decisions and Declarations of Interests 
(d) Business brought forward by the Leader as a matter of urgency 
(e) Minute(s) of the previous meeting(s) including Sub-Committee
Page 185

Page 186

8 
(f) Written Questions 
(g) Petitions 
(h) Notices of Motion 
(i) Statutory or other competent business 
(j) Information Reports – Called In (if any) 
(k) Questions on Minutes 
(l) Question Time 
30. The business at special meetings shall take place in the same order, except that
notice of urgent business, minutes, written questions, petitions, Notices of Motion,
Information Reports and Question Time shall not be included 
31. No matter in the notice calling the meeting of a Committee competently before the
Council shall be withdrawn by the Leader except where agreement has been
reached between the Leader and the relevant Chief Officer. 
APPROVAL OF MINUTES 
32. At each ordinary meeting of the Council, the Minutes of the previous ordinary
meeting, and any intervening special meeting (where practicable), shall be circulated
as an agenda item for approval.  No motion or discussion shall be allowed on these
Minutes, except as to their accuracy as a record of the meeting to which they relate. 
Any objection on this ground must be made by motion and, if necessary, the matter
shall be decided by vote in the ordinary manner, provided that for this matter voting
shall be restricted to those Members who were present at the meeting to which the
Minute relates.  After the Minutes are approved, with or without amendment, they
shall be signed by the Leader. 
33. The procedure in Standing Order 32 above shall apply to Committees and Sub-
Committees of the Council with the Chair signing the minute. These signed minutes
will then be made available for inspection by all Councillors. 
34. A minuted decision of the Council shall not be altered or revoked within six months
of its approval, except for the purposes of budget setting or by suspension of Standing
Orders under Standing Order 85 below. 
NOTICES OF MOTION 
35. (a) The purpose of a Notice of Motion is to give any Member the opportunity to
raise an item of strategic relevance at an ordinary Council/Committee meeting.
If a Member does not sit on a Committee, they shall be allowed to attend the
committee to introduce their motion but shall not be allowed to take part in any
voting. 
(b) Every Notice of Motion shall be in writing.  It shall be signed by the Member of
the Council giving the Notice and counter-signed by at least one other Member
who is a member of the relevant committee.  A Notice of Motion shall meet the
Page 186

Page 187

9 
competency requirements contained in Standing Order 49. Where a motion
would have significant financial impact, this should be specified along with the
budget from which any financial commitment may be met. 
(c) A Notice of Motion must be received by the Proper Officer by 4 pm on the date
10 clear working 14 days before the relevant meeting. 
Monday meeting 4pm on Friday 2 weeks before meeting
Tuesday meeting 2pm on Monday 2 weeks before meeting
Wednesday meeting 4pm on Tuesday 2 weeks before meeting
Thursday meeting 4pm on Wednesday 2 weeks before meeting
Friday meeting 4pm on Thursday 2 weeks before meeting 
(c)(d) The foregoing provision shall not apply in a case where the Leader decides, in
terms of Section 50B (4) (b) of the 1973 Act, that the matter is one of urgency. 
(d)(e) If a Notice of Motion is not moved by its author (or some other Member with
their written authority) and seconded, it shall be considered as dropped from
the agenda of the committee. 
(e)(f) When a Notice of Motion has been considered by the Council it shall not be
competent for any Member to propose a similar motion within a period of six
months. 
WRITTEN QUESTIONS 
36. Any Member can put one question about relevant and competent business not
already on the Agenda to the Leader.  No Member can put more than one question
at any meeting.  The Member must give notice in writing of their question to the
appropriate Officer by 12 noon two clear working days prior to the day of the
meeting.  A copy of any written answer provided by the Leader or Chair will be
tabled one hour before the start of the relevant meeting.  The Member who has put
the question may, after the answer has been given, ask one supplementary
question directly related to the subject matter but no discussion will be allowed. 
Monday meeting 12pm on Wednesday before meeting
Tuesday meeting 12pm on Thursday before meeting
Wednesday meeting 12pm on Friday before meeting
Thursday meeting 12pm on Monday before meeting
Friday meeting 12pm on Tuesday before meeting
36. 
37. No supplementary question can be put or answered more than 10 minutes after the
Council has started on the relevant item of business, except with the permission of
the Leader.  If a Member does not have the opportunity to put a supplementary
question because no time remains then they can submit it in writing to the Proper
Officer who will arrange for a written answer to be provided within 7 working days. 
INFORMATION REPORTS – CALL IN 
38. Any member of the Committee wishing to call in a noting or information report from
one meeting shall give notice to Committee Services at least 48 hoursby 12 noon 2
Formatted Table
Formatted: Indent: Left:  1.27 cm,  No bullets or numbering
Formatted Table
Formatted: Font: (Default) Arial, 12 pt, Font colour: Black
Formatted: Indent: Left:  1.27 cm,  No bullets or numbering
Page 187

Page 188

10 
clear working days before the meeting for which the report is published. The Notice
shall be countersigned by one other elected member who sits on the Committee
and shall explain the reason for call in including any action sought. 
Monday meeting 12pm on Wednesday before meeting
Tuesday meeting 12pm on Thursday before meeting
Wednesday meeting 12pm on Friday before meeting
Thursday meeting 12pm on Monday before meeting
Friday meeting 12pm on Tuesday before meeting 
PETITIONS 
39. A Petition received relevant to the remit of a particular Committee may be included
on the agenda of business for that Committee meeting if:- 
(a) It has been agreed as a valid petition for that Committee in discussion with the
Leader; and 
(b) It has been received no less than 3 weeks in advance of the meeting. 
40. Petitions admitted in terms of Standing Order 39 shall be considered in accordance
with the relevant internal procedural guidance. In the event of a conflict between
that procedure and Standing Orders, the Standing Orders shall take precedence. 
QUESTION TIME 
41. At each ordinary meeting of the Council and its standing Committees (including
Sub-Committees), 10 minutes will be allowed for question time when any Member
of the Committee can put a question to the Chair of that Committee/Sub-Committee
on any business within the Council/Committee's remit. Provision for this question
time will be included in the agenda for the meeting. A Member who has put a
question may, after the answer has been given, ask one supplementary question
directly related to the subject matter, but no debate will be allowed. Questions on
minutes must not be taken as an opportunity to re-open debate. 
42. No supplementary questions can be put or answered more than 10 minutes after
the Council has started on this agenda item, except with the permission of the
Leader. If a Member does not have the opportunity to put a supplementary question
because no time remains, then they can submit it in writing to the Proper Officer
who will arrange for a written answer to be provided within 7 working days. 
MOTION AND AMENDMENTS 
43. Every motion or amendment on any question shall be moved and seconded and
shall, if the Leader so requires, be noted by the Committee Clerk in writing and read
to the meeting before the motion or amendment is further discussed 
44. All amendments must be relative to the motion and no Member shall be at liberty to
move or second (a) more than one amendment to any motion or (b) an amendment
if they have moved or seconded the motion.  If an amendment is withdrawn, the
mover and seconder thereof shall be at liberty to move or second another
amendment or to speak in support of such amendment. 
Page 188

Page 189

11 
45. No motion to which an amendment has been moved and seconded shall be altered
in substance or withdrawn without the leave of the mover and/or seconder. 
46. After an amendment has been moved and seconded, it shall not be withdrawn or
altered in substance without the leave of the mover and/or seconder. 
47. Subject to Standing Orders 44 and 45 above, a motion or amendment may be
withdrawn at any time prior to it being put to a vote. 
48. A motion for the approval of a Minute of meeting of a Committee, or of any part of
such Minute, shall be considered as the motion and any form of proposal, including
a proposal to proceed to next business, which implies mere negation or otherwise if
moved, shall be dealt with as an amendment thereto. 
49. If a motion or amendment is, in the opinion of the Leader, irrelevant or incompetent,
they shall rule the same out of order.  When determining questions of relevance and
competence the Leader shall consider the following questions: 
(a) Is the motion at the correct committee, in terms of the Council’s Scheme of
Administration?
(b) Are there any procedural or legal barriers?
(c) After discussion with Members, do they have sufficient information before
them to come to a reasoned and balanced decision? 
50. The Chair shall, if present, have the right to move the approval by the Council of the
Minute of any meeting of that Committee or of any part of such Minute.  
51. The Leader shall have the right to move the approval of a report.  Approval of a
report shall be considered as a motion. 
52. Motions and amendments which are not seconded shall be recorded. 
DEBATE PROCEDURES 
ORDER OF DEBATE 
53. Every Member of the Council who is called to speak shall address the Leader and
shall direct their speech (a) to the matter before the meeting by proposing,
seconding or supporting the motion or any amendment relative thereto or (b) to a
point of order or information.   
54. On any debate on issues of particular local interest (excepting debate on a Notice of
Motion), local Members indicating a wish to speak (by giving advance notice to the
Leader or Committee Clerk), shall be called to speak first by the Leader. 
55. Subject to the right of reply vested in the mover of a motion or an amendment, no
Member shall speak more than once to the same question at any meeting of the
Council except with the permission of the Leader, or on a point of order or, in
explanation or to clear up a misunderstanding in regard to some material part of
their speech, in which case no new matter shall be introduced. 
Page 189

Page 190

12 
56. The mover of the motion or an amendment shall have a right of reply but shall
introduce no new matter and, after the reply is commenced no other Member shall
speak on the question except as provided in Standing Order 55. 
57. In moving the motion (other than a motion to adopt the Annual Accounts or Annual
Estimates) or an amendment, a Member shall not speak for more than 5 minutes
and every other speaker, and the mover of the motion in reply, shall not speak for
more than 3 minutes. The foregoing limits of time may be exceeded with the
permission of the Leader. 
POINTS OF ORDER 
58. Any Member of the Council may at any time at any meeting of the Council speak
upon a point of order suddenly arising as soon as possible and must refer to the
particular Standing Order which, in their opinion, is being infringed. 
59. The Member who is then addressing the Council shall cease and the Member who
is speaking on the point of order shall address the point of order at issue stating the
basis on which they believe the order has been infringed without making any further
substantive point and thereafter shall cease in order to allow a ruling to be given by
the Leader.  No other Member shall be entitled to speak to the point of order raised
except by permission of the Leader. 
60. The Leader shall thereupon decide the question and, thereafter, the Member who
was addressing the Council at the time the point of order was raised shall be
entitled (if the ruling permits him/her so to do) to continue their speech, giving effect
to the ruling of the Leader. 
61. The decision of the Leader shall be final on all points of order. 
CLOSURE OF DEBATE 
62. At any meeting of the Council it shall be competent for any Member of the Council
who has not spoken on a matter being discussed to move (but without making a
speech), after not fewer than seven Members (excluding the movers and seconders
of the original motion and of any amendments) shall have spoken on such matter,
"That the question be now put". 
63. On such motion being seconded, the Leader shall put the same to the meeting
without speeches or discussion, and the vote shall be taken.  If the motion for
closure of debate be carried, the mover of the original motion shall have the right of
reply and thereafter the matter under discussion shall be voted on in the ordinary
way; if the motion for closure is not carried, the debate shall be resumed. 
64. Such a motion may be competently moved a second time after not fewer than five
additional Members have spoken and so on after every five additional Members
have spoken. 
VOTING PROCEDURES 
65. Except in the case of filling a vacancy or vacancies and of making appointments,
the following provisions shall apply as to voting:- 
Page 190

Page 191

13 
(a) A vote shall normally be taken by electronic count which shall record as to
which motion and amendment each Member voted for, as to which Members
abstained and as to which Members were absent and a notation as to which
shall be recorded in the appropriate Minute of the Meeting.   It shall however
be competent to take the vote by roll call, show of hands, by ballot or in any
other manner as may be agreed upon. 
(b) When there is only one amendment to the motion, the vote shall be taken
between the motion and the amendment and whichever is carried shall
become the finding of the meeting and the Council shall be deemed to have
resolved accordingly. 
(c) When there are more amendments to the motion than one, then, unless the
Leader otherwise decides in order to avoid inconsistency in voting, the last
amendment shall be put against that immediately preceding and then the
amendment which is carried shall be put against the next preceding and so on
until there remains only one amendment, between which and the motion the
Council shall divide and whichever is carried shall become the finding of the
meeting and the Council shall be deemed to have resolved accordingly. 
(d) If however, one of a number of amendments is any form of proposal which
implies mere negation, the first division shall be taken between it and the
motion.   If the amendment is carried, the Council shall proceed to the next
business. If the amendment is not carried, it shall be eliminated from the
amendments which, with the motion, shall be voted on in the usual way. The
view of the Leader on the order of voting shall be final. 
(e) Where there is an equality of votes, the Leader shall have a casting vote. 
66. In the case of filling a vacancy or vacancies and of making appointments, the
following provisions shall apply as to voting which shall be by secret ballot where it
relates to a staff appointment. 
(a) Where only one vacancy requires to be filled and two candidates are proposed
and seconded for appointment, a vote shall be taken as between these
candidates and the candidate who receives the majority of votes shall be
declared duly appointed. Where in such a case as aforesaid more than two
candidates are proposed and seconded for appointment, a vote shall first be
taken as among all these candidates, each Member being entitled to vote for
one candidate only. If, as a result of this vote, any candidate receives an
absolute majority of the votes of the Members of the Council present and
voting, such candidate shall be declared duly appointed. If no candidate
received such a majority, the name of the candidate receiving the smallest
number of votes shall be struck out, provided that, if two or more candidates tie
as receiving the smallest number of votes, a vote or votes shall be taken as
between or among these candidates and the candidate who receives the
smaller or smallest number of votes shall be dropped. In subsequent votes, the
same course shall be followed until one of the candidates receives an absolute
majority of votes, when he/she shall be declared duly appointed or until the
candidates are reduced to two, when a final vote shall be taken and the
candidate receiving the majority of votes shall be declared duly appointed. 
(b) In the case where more than one vacancy requires to be filled, a vote shall first
be taken as among all the candidates proposed and seconded for appointment
Page 191

Page 192

14 
where these exceed the number of vacancies, each Member being entitled to
vote for candidates up to the number of vacancies to be filled.  The result shall
be decided by the first vote except in the case where two or more candidates
tie as having received an equal number of votes for the vacancy or vacancies.
In such cases an additional vote or votes shall be taken as between or
amongst these candidates with the candidate having least votes being
eliminated and so on until the number of candidates remaining is equal to the
number of vacancies. 
(c) Where in any vote between two candidates or, after such additional vote as
may be required by (a) and (b) above, there is an equality of votes, the
Leader/Chair of the meeting shall have a casting vote, except where the matter
which is subject of the vote relates to the appointment of a Member of the
Council to any particular office or Committee, in which case the decision shall
be by lot. 
(d) In the case of a vote relating to the appointment of a Chief Officer the minute
shall record - 
(i) the names of those candidates proposed and seconded for appointment
but not the names of proposers or seconders, and 
(ii) the name of the candidate who received the votes of a majority of those
present and voting but not the names or numbers of those voting for
each candidate. 
DISSENT 
67. Any Member of the Council who at any meeting of the Council has taken part in a
vote or has proposed a competent motion or amendment which has not been
seconded may at such meeting enter their dissent for the resolution adopted
provided that resolution has a financial or legal implication for the Council, which
dissent shall be recorded in the Minute of the meeting, without giving reasons
therefor.  A Member entering their dissent in accordance with this provision may,
within fourteen days of such meeting, lodge with the Chief Executive a statement
containing his/her reasons of dissent. 
68. No Member shall be entitled to enter their dissent from a resolution of the Council
except at the meeting at which such resolution is adopted. 
69. Except as herein provided, no reservation or qualification by any Member with
respect to a particular resolution shall be recorded in the minutes of meetings of the
Council. 
ADMISSION OF PRESS AND PUBLIC 
70. By virtue of the provisions of Section 50A of the Local Government (Scotland) Act
1973 meetings of the Council and its Committees and Sub-Committees shall be
open to the public except to the extent (a) that the public shall be excluded under
Section 50A(2) of the 1973 Act during consideration of an item of business
whenever it is likely that, if they were present, confidential information, as defined in
Section 50A(3) of the 1973 Act, would be disclosed to them, or (b) that the public
may be excluded by resolution under Section 50A(4) of the 1973 Act during
Page 192

Page 193

15 
consideration of an item of business whenever it is likely that, if Members of the
public were present, exempt information, as defined in Section 50A of the 1973 Act,
would be disclosed to them.  On a motion for adoption of such a resolution being
duly moved and seconded, the Leader shall put the same to the meeting without
speeches or discussion and, on such a motion being carried, all Members of the
public present (including representatives of the press but not including Members of
the Council) shall be directed to leave the meeting. 
71. Members of the Council remaining in attendance at meetings of Committees or
Sub-Committees of which they are not a Member with the consent of the Leader in
terms of this provision are required to comply with the provisions of Standing Order
23 in relation to disclosure of interest and the provisions of Standing Order 72 as if
they were Members of that Committee or Sub-Committee. 
72. Notwithstanding the exclusion of the public as aforesaid, the Leader may permit any
person to remain in attendance at any meeting for so long as they consider
necessary and on the basis that such persons respect the confidentiality of the
proceedings. 
73. (a) Information as to the proceedings at any meeting from which the public and
press are excluded shall not be given to representatives of the press or to
any other person except by the Leader, or by a person authorised by the
Leader to do so. 
(b) Upon information being given in terms of Standing Order 73 (a) other
Members of the Council shall be entitled to speak on the matter but only to
the extent that information has been provided by the Leader or person so
authorised. 
(c) For the avoidance of doubt Members providing information beyond that
provided by the Leader or person so authorised will be in breach of Standing
Order 73 (a) and liable to action on the part of the Council including action in
terms of the Councillors’ Code of Conduct. 
COMMITTEES 
74. The Leader and Depute Leader of the Council, in addition to membership of
Committees, Sub-Committees and Ad hoc Committees allocated to them as
ordinary Members of the Council shall, ex officio be Members of other Committees
and Sub-Committees of the Council but such additional membership shall not
confer the right to vote.  Other Members of the Council may be present at
Committees and Sub-Committees of which they are not Members with the
agreement of the Chair and may be called upon by the Chair to speak, but shall not
be entitled to pose questions, enter the debate or vote. This discretion to permit
attendance shall apply to quasi-judicial Committees and Sub-Committees only
where a Protocol is in place which ensures compliance with Human Rights
legislation. 
75. Members of any Appointments Committee, Sub-Committee, Adhoc Committee may,
if unable to attend such meetings be represented by a substitute with full voting
rights from Members of the Council, provided the name of that substitute has been
intimated to  Legal and Democratic Services not later than the last working day
before the appropriate meeting. 
Page 193

Page 194

16 
76. Any proposed permanent alteration to the membership of Committees should be
intimated in writing from Group Leaders or individual Councillor if not affiliated to a
political group to Legal and Democratic ServicesCommittee Services not later than
the seventh working day before a scheduled meeting of the Council and shall
thereafter be considered by the Council if required. 
77. All Committee Meetings held on mornings will start at 9.30am and shall adjourn at
12.45pm for lunch and those held on afternoons will start at 2.00pm and shall
adjourn not later than 5.00pm. 
78. Matters referred to or delegated to Committees shall be as set out in the
Administrative Scheme as approved by the Council and deemed to form part of
these Standing Orders. Authority conferred upon Officers of the Council in terms of
the Scheme of Delegation approved by the Council shall likewise be deemed to
form part of these Standing Orders. 
OBSTRUCTIVE AND OFFENSIVE CONDUCT 
79. In the event of any Member at any Council meeting disregarding the authority of the
Leader, or being guilty of obstructive or offensive conduct, a motion may be
thereupon moved and seconded to suspend such a Member for the remainder of
the sitting.  The motion shall be put without discussion and, if it be carried, the
Member concerned shall forthwith leave the Council chamber or meeting place and
the Council Officers shall act on such orders as may be received from the Leader in
pursuance of such resolution. 
COUNCILLORS’ CODE OF CONDUCT 
80. Members of the Council, Members of Committees of the Council and all Officers of
the Council are required to comply with the terms of the Councillors’ Code of
Conduct and the Financial Regulations. 
APPLICATION OF STANDING ORDERS OF THE COUNCIL TO COMMITTEES 
81. The provisions of the Standing Orders of the Council, except as otherwise 
provided, shall, so far as applicable and not inconsistent with any Standing Orders
expressly applicable to Committees, apply to Committees of the Council and to
Sub-Committees of Committees in like manner as they apply to the Council.
References to the Leader/Depute leader shall then become references to the
Chair/Depute Chair.   
QUESTIONS OF PROCEDURE 
82. The Leader shall at their discretion, with or without discussion, determine all
questions of competency and procedure in reference to which no express provision
is made under these Orders. 
SUPPLY OR DISPOSAL OF GOODS AND EXECUTION OF WORK CONTRACTS 
83. With respect to proposed contracts for the execution of works, the provision of
services, or the supply of goods or materials, the following provisions shall apply
relating to securing competition for such contracts and for regulating the manner in
which tenders are invited. 
Page 194

Page 195

17 
(a)  The Officer responsible for procurement shall ensure, in consultation with the
Monitoring Officer and the Chief Financial Officer, that all public procurement
legislation shall be complied with; 
(b)  The Officer responsible for procurement shall prepare and submit to the
Council a Procurement Policy, Strategy and Procedure Notes which, once
approved and adopted by the Council, shall be observed by all Members and
Officers of the Council, and shall be deemed to be part of these Standing
Orders. 
(c) The Policy, Strategy and Procedure Notes shall include provisions
governing:-
• tender procedures to be followed
• financial limits for different procedures
• contract documentation. 
ALTERATION OR RESCISSION OF PREVIOUS RESOLUTION 
84. No resolution of the Council shall be altered or revoked within six months of its
adoption except for the purposes of budget setting or by suspension of Standing
Orders. 
SUSPENSION, ALTERATION AND REVIEW OF STANDING ORDERS ETC. 
85. So far as not inconsistent with any statutory provisions, any one or more of the
Standing Orders may be suspended at any meeting, but so far only as regards the
business at such a meeting, provided that two-thirds of the Members of the Council
present and entitled to vote agree, that there has been a relevant and material
change of circumstances which shall be specified in the motion proposing the
suspension. Where the issue of suspension is being considered relative to an item
of business, the agreement of the Council to a suspension should be confirmed
before the relevant suspension is debated.  This is however subject to the general
power of the Leader to control procedure at the meeting.   
86. No alteration of the Standing Orders shall be made without notice given at one
meeting of the Council to be discussed at the following one, and shall not be
effected except on a resolution, adopted by a majority of the Members present and
voting. 
87. The Council shall, at least once every year, review these Standing Orders to
determine whether any alteration should be considered. 
Page 195

Page 196

Page 196