Moray Council 
Wednesday, 06 December 2023 
NOTICE IS HEREBY GIVEN that a Meeting of the Moray Council is to be held at
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Wednesday,
06 December 2023 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 17 and 18 of
business on the grounds that it involves the likely disclosure of exempt
information of the class described in the relevant Paragraphs of Part 1
of Schedule 7A of the Act.”   
4. Minutes 
4a. Minutes of Meeting of Moray Council on 27 September
2023
7 - 20
4b. Minutes of Special Meeting of Moray Council on 4
October 2023
21 - 22
4c. Minute of Special Meeting of Moray Council on 25
October 2023
23 - 34
5. Written Questions ** 
6. Notice of Motion - Lift the Ban 35 - 38
Page 1

Page 2

7. Notice of Motion - Business Rates Incentivisation
Scheme
39 - 40
8. Moray Integration Joint Board Summary
Report by Chief Officer, Health and Social Care Moray  
41 - 44
9. Revenue Budget Monitoring - 30 September 2023
Report by Depute Chief Executive (Economy, Environment and
Finance)  
45 - 76
10. Capital Plan 2023-24 Quarter 2
Report by Depute Chief Executive (Economy, Environment and
Finance)  
77 - 92
11. Smarter Working Project - Progress Update
Report by Depute Chief Executive (Economy, Environment and
Finance)  
93 -
108
12. Monitoring Officer Report from 1 November 22 to 31
October 23
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
109 -
114
13. Review of Outside Body Appointments
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
115 -
116
14. Petitions Procedure - Under 18 Year olds
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
117 -
126
15. Information Reports - if called in 
16. Question Time ***
Consider any oral question on matters delegated to the Committee in
terms of the Council's Scheme of Administration. 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
17. Professional Fees [Para 1]
• 1. Information relating to staffing matters; 
Page 2

Page 3

18. Moray Leisure Centre Expansion Proposal Update [Para
6]
• 6. Information relating to the financial or business affairs of any
particular person(s); 
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person, if you wish to do so,
please come to the High Street entrance door and a member of
staff will be let into the building. 
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services at least 48 hours
before the meeting for which the report is published. The Notice shall
be countersigned by one other elected member and shall explain the
reason for call in including any action sought. 
Information Report - Polling District Review 2023 Report
Report by Depute Chief Executive (Education, Communities and
Organisational Development)  
127 -
132 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how
the individual or members of the group will vote on any item(s) of business on
the Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any
relevant and competent business within the specified remits not already on the
agenda, to the Chair provided it is received by the Proper Officer or Committee
Services by 12 noon two working days prior to the day of the meeting.  A copy
of any written answer provided by the Chair will be tabled at the start of the
relevant section of the meeting.  The Member who has put the question may,
after the answer has been given, ask one supplementary question directly
related to the subject matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the
consent of the Chair. If a Member does not have the opportunity to put a
supplementary question because no time remains, then he or she can submit it
in writing to the Proper Officer who will arrange for a written answer to be
provided within 7 working days. 
*** Question Time - At each ordinary meeting of the Committee ten minutes will be
allowed for Members questions when any Member of the Committee can put a
question to the Chair on any business within the remit of that Section of the
Committee.  The Member who has put the question may, after the answer has
been given, ask one supplementary question directly related to the subject
matter, but no discussion will be allowed. 
No supplementary question can be put or answered more than ten minutes
after the Committee has started on the relevant item of business, except with
the consent of the Chair.  If a Member does not have the opportunity to put a
supplementary question because no time remains, then he/she can submit it in
writing to the proper officer who will arrange for a written answer to be provided
within seven working days. 
Page 4

Page 5

MORAY COUNCIL 
Moray Council 
SEDERUNT 
Councillor Kathleen Robertson  (Chair)
Councillor Donald Gatt  (Depute Chair)  
Councillor James  Allan  (Member)
Councillor Peter Bloomfield  (Member)
Councillor Neil Cameron  (Member)
Councillor Tracy Colyer  (Member)
Councillor Theresa Coull  (Member)
Councillor John Cowe  (Member)
Councillor John Divers  (Member)
Councillor Amber Dunbar  (Member)
Councillor Jérémie Fernandes  (Member)
Councillor David Gordon  (Member)
Councillor Juli Harris  (Member)
Councillor Sandy Keith  (Member)
Councillor Scott Lawrence  (Member)
Councillor Graham Leadbitter  (Member)
Councillor Marc Macrae  (Member)
Councillor Paul McBain  (Member)
Councillor Neil McLennan  (Member)
Councillor Shona Morrison  (Member)
Councillor Bridget Mustard  (Member)
Councillor Derek Ross  (Member)
Councillor John Stuart  (Member)
Councillor Draeyk Van Der Horn  (Member)
Councillor Sonya Warren  (Member)
Councillor Ben Williams  (Member)  
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Moray Council 
Wednesday, 27 September 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor Neil Cameron, Councillor Tracy Colyer,
Councillor Theresa Coull, Councillor John Divers, Councillor Amber Dunbar,
Councillor Jérémie Fernandes, Councillor Donald Gatt, Councillor David Gordon,
Councillor Juli Harris, Councillor Sandy Keith, Councillor Scott Lawrence, Councillor
Graham Leadbitter, Councillor Marc Macrae, Councillor Paul McBain, Councillor Neil
McLennan, Councillor Shona Morrison, Councillor Bridget Mustard, Councillor
Kathleen Robertson, Councillor Derek Ross, Councillor John Stuart, Councillor
Draeyk Van Der Horn, Councillor Sonya Warren, Councillor Ben Williams 
APOLOGIES 
Councillor James  Allan, Councillor John Cowe 
IN ATTENDANCE 
The Chief Executive, Depute Chief Executive (Economy, Environment and
Finance), Head of Governance, Strategy and Performance, Head of Environmental
and Commercial Services, Chief Financial Officer, Acting Head of Education
Resources and Communities, Head of HR, ICT and Organisational Development,
June Burnett, Development Officer, Democratic Services Manager and Caroline
O'Connor, Committee Services Officer.   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Declaration of Group Decisions and Members Interests * 
In terms of Standing Orders 21 and 23 and the Councillors' Code of conduct,
Councillor Robertson declared that the Conservative Group had discussed items 7
(Notice of Motion - Telford Bridge) and 12 (Local Visitor Levy) on the agenda and
had agreed a position as a Group.  
There were no other declarations from Group Leaders or Spokespersons in regard
to any prior decisions taken on how members will vote on any item on the agenda
or any declarations of Member's interests in respect of any item on the agenda.   
3.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 17-19 of business on the
grounds that it involves the likely disclosure of exempt information of the class.
Item 4a.
Page 7

Page 8

Para number of the
minute Para Number of Schedule 7a
18 Para 1
Information in relation to staffing matters
19
Para 8 and 9
Information in relation to terms and/or expenditure to be
incurred by the Authority
20 Para 1
Information relating to staffing matters    
4.         Order of Business 
Councillor Robertson, in her role as Chair confirmed that she has the ability to
accept late papers onto the agenda, however she felt that it was not acceptable to
expect Members to read over 171 pages in less than 2 days before a meeting and
expect full deliberation of the report.  She therefore withdrew the report on the
Cloddach Bridge report from the meeting agenda.  
She further added that members may wish to question the other late paper on the
ELC and Primary School Staffing, however confirmed that with the exception of the
covering report, the papers remained the same as those presented to the
Education, Children's and Leisure Services Committee on 19 September.  
Councillor Robertson further confirmed that Item 13 on the agenda had been
withdrawn due to operational reasons and will come back to a future meeting of
the Council.  
The Depute Chief Executive (Economy, Environment and Finance) understood the
concerns around the Cloddach Bridge report, however highlighted that deferral of
the report may have risks if not discussed today with regards to funding from the
UK Government and proposed considering the report at a Special Meeting of
Moray Council following the Special Corporate Committee on 4 October
2023.  She further added that any further delay reduces the time available for
Officers to produce a Full Business Case, should that be the Council's decision.  
Members confirmed that they would be happy to hold a special meeting on 4
October 2023.  
Councillor McLennan sought clarification on why Item 19 on the agenda was to be
held in confidence.  
In response, the Chief Executive confirmed that the report related to staffing
issues. 
5.         Minutes of meeting of 23 August 2023 
The minute of the meeting of 23 August 2023 was submitted and approved.  
6.         Written Questions 
The Council noted that no written questions had been submitted. 
Page 8

Page 9

7.         Notice of Motion - Lift the Ban 
In terms of Standing Order 35a there was submitted a Notice of Motion by
Councillor Fernandes, seconded by Councillor Leadbitter in the following terms:  
Right to work for asylum seekers  
Lift the Ban is campaigning to restore the right to work for everyone waiting for
more than 6 months for a decision on their asylum claim.  
People seeking protection in the UK should be able to work and make the most of
their potential, to provide for themselves and their families, similar to Ukrainian
refugees who do already have the right to work.  
Restrictions on right to work can lead to extremely poor mental health outcomes
and waste of potentially invaluable talents and skills, both for the local economy
and wider society.  
The Council’s own risk register lists Human Resources (People) at Very High with
a likelihood of 5 out of 5, and that it is “difficult to recruit in a range of areas
including certain subject teachers, vehicle technicians, specialist professional
posts, senior management, clerical and administrative roles, temporary and relief
staff, and community care employees.”  
Allowing people seeking asylum the right to work would lead to positive outcomes
for individuals as well as benefiting public and private sector organisations in the
region who are struggling with recruitment and retention.  
A majority of Scots believe that Scotland needs to attract more people through
immigration to work in key industries and public services.  
In 2022 the Shortage Occupational List was expanded to include positions like
social care, nursing, opening the possibility of employment for people seeking
asylum. Council welcomes the UK Migration Advisory Council report in March
2023 into labour shortages in the construction and hospitality sectors and the
potential use of the immigration system as a response, with a further report
following a call for evidence due to be published this autumn.  
Action  
Council therefore agrees:  
▪ To confirm support for the Lift the Ban campaign and our belief that the right to
work is a fundamental human right;
▪ To formally join the Lift the Ban coalition alongside other local authorities,
following the lead of Glasgow who joined earlier this year; and
▪ To instruct the Council Leader to write to the UK Government urging that they
introduce legislation giving people seeking asylum the right to work, setting out
the significant workforce pressures Moray is currently facing. 
Financial Consequences 
• There are no financial consequences.  
Page 9

Page 10

Councillor Robertson stated that the Notice of Motion requested that a letter be
written to the Westminster Government, and as agreed at the previous meeting of
Moray Council, any Notice of Motion requesting a letter be sent must include the
wording for the letter at the time of submission and as yet the wording had not
been received and she therefore declared the Notice of Motion not competent and
would not be considered at this time.  
In response, Councillor Fernandes expressed disappointment and would re-submit
the Notice of Motion to the next ordinary meeting of the Council.  
8.         Notice of Motion - Telford Bridge 
In terms of Standing Order 35a there was submitted a Notice of Motion by
Councillor Harris, seconded by Councillor Ross in the following terms:  
Telford Bridge, Craigellachie - Ownership and Future Development 
Background 
The Telford Bridge in Craigellachie is a world-renowned engineering structure
conceived and designed by Thomas Telford and constructed between 1812 and
1814 following a large public fundraising exercise.    
The bridge has been recognised as a landmark of importance by both the
American Society of Civil Engineers and the Institution of Civil Engineers.    
The bridge is currently used as a footbridge over the Spey and is a popular
landmark for visitors and locals alike in Speyside. Many visitors come to Moray
Speyside specifically to see this historic structure.    
The local community, including the Friends of Craigellachie Bridge, have
expressed concern over the condition of the bridge and how future maintenance of
this historic site can be assured.    
Friends of Craigellachie Bridge commissioned an inspection report in 2022, which
identified structural repairs that required to be carried out over the coming years.
The Friends of Craigellachie Bridge have been established for ten years and have
been involved in fundraising, awareness raising, and seeking to establish
ownership of the bridge in order to identify a means of maintaining and preserving
the bridge for current and future generations to enjoy. There is a pressing need to
have a full condition assessment carried out on the bridge. 
As a historic monument, future ownership and management of the bridge by
charitable organisations, such as a Community Development Trust, a Community
Benefit Company or an organisation such as Historic Scotland could provide a
possible alternative route to funding major preservation and interpretation works
relating to the bridge. 
Actions 
Council notes the historical significance of the Telford Bridge, Craigellachie and
the aspirations of the community with regard to its future preservation. 
Council instructs officers to bring forward a report to Council covering the following
matters: 
• The known condition of the bridge
Page 10

Page 11

• What further inspection work may be required to ascertain fully the
maintenance requirements and associated costs
• Current ownership and maintenance responsibilities for the bridge including
whether a CPO may be required to define clear ownership
• Other future ownership/leasing options that could be considered 
Financial Implications 
A report would require officer time but could also generate options that would
reduce future council involvement whilst securing the long-term future of the bridge
as a major historical asset to Moray Speyside. 
Councillor Gatt added that it is difficult to disagree with the Notice of Motion,
however, given the Council's financial situation, he proposed, seconded by
Councillor Bloomfield to move against the motion.  He further added that the
Bridge does not belong to the Council and is not a priority and along with the multi
million pound budget gap it would be difficult to afford even the Officer time to
come back with a further report when decisions on closing or cutting other services
still need to be taken.  
In response, the Head of Commercial and Environmental Services confirmed that
a principal survey was carried out on the bridge in 2014 and a general inspection
was carried out in 2023 which identified low to medium works and therefore the
condition is known.  If a detailed condition assessment was to be carried out, it
would cost in the region of £30k.  She further added that the ownership of the
bridge is unknown but a route to determining ownership could be achieved by the
Council exercising its Compulsory Purchase Powers, however this could only be
undertaken on a full cost recovery basis and this has been discussed with the
Friends of Craigellachie Bridge on a number of occasions.    
The Chief Executive further added that any expenditure on time or money by the
Council needs to be covered by the community and the Friends of Craigellachie
Bridge have been directed towards potential funding models which have been
successful in other parts of the country.  He further added that funding for a
community body is more readily available than to the Council and this is the route
that Officers are trying to take are keen for the Council to endorse to allow this to
progress.  
Adjournment of the Meeting
The Chair proposed a short adjournment to allow the proposers of the motion and
amendment to have a short discussion with Officers.  
Resumption of the Meeting
Following a short adjournment Councillor Harris summed up her motion by stating
that there had been a long discussion and both herself and Councillor Ross had
provided a good argument for a short report to be brought back to a future meeting
of the Council and urged members to support the motion.  
In response, Councillor Gatt agreed to withdraw his amendment based on
information received during the adjournment and commended the proposer and
seconder for bringing the Notice of Motion to the meeting.  Councillor Bloomfield
agreed to withdraw his seconding of the amendment.  
Therefore the meeting agreed the notice of motion as stated.    
Page 11

Page 12

9.         Short to Medium Term Financial Plan 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) which asked the Council to consider the revised budget
for 2023/24 and consequent revisions to the estimated budget position for 2024/25
and 2025/26.  The report also asked Council to approve a Short to Medium Term
Financial Strategy aimed at closing the estimated budget bap by 2025/26.  
Councillor Mustard proposed amending recommendation (iv) to read:  
iv)
the risk factors set out in section 6 of this report as well as the highlighting
the recommendations identified by the Internal Auditor on financial
maximisation and improved financial processes. 
Councillor Mustard also suggested amending recommendation 2.2 to read:  
2.2 approve the Short to Medium Term Financial Strategy set out in Appendix 2
including a 3 year approach in principle to income strategy. 
In response, the Chief Financial Officer confirmed that a 3 year approach with
regards to charging is already contained within the Strategy and will be included in
a report on charges later in the year and the report would include revisions to the
charging policy looking at extending it over a 3 year period and therefore felt that
any amendment at this stage was not required.  
In terms of Councillor Mustard's first point the Chief Financial Officer confirmed
that she was happy to include more text around the recommendations identified by
the Internal Auditor on financial maximisation and improved financial processes
within the Strategy document.  
In response, Councillor Mustard confirmed she was happy with the responses from
the Chief Financial Officer.  
Following further consideration the Council unanimously agreed to:  
i) note the revised budget for 2023/24 and, based on current estimates,
consequent anticipated small improvement in financial position for 2024/25;    
ii) note the timeline for future revisions of the budget gap;    
iii) note that there is still considerable uncertainty around key budget
assumptions in 2023/24 which will further alter the budget gap;    
iv) note the risk factors set out in section 6 of this report ;    
v)
note that notwithstanding the small improvement in budget position from that
reported in June, the structural deficit remains and given ongoing
uncertainties, the Council still requires to make very significant levels of
savings in a short time frame; and 
vi) approves the Short to Medium Term Financial Strategy set out in Appendix
2 to this report.   
Page 12

Page 13

10.         Treasury Management Performance Indicators 2022-23 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) providing Council with the annual outturn report on
Treasury Management  and details of the Council's Prudential Indicators for
Treasury Management and Capital Investment for the year ended 31 March 2023.  
Following consideration the Council unanimously agreed to note the Treasury
Management Performance and the Council's Treasury Management and Capital
Investment Prudential Indicators for 2022/23 as set out in Appendix 2.  
11.         Finance Policy Reviews 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) inviting the Council to approve changes to the Council's
Financial Regulations, Authorisation Policy, Grant Funding Procedures and Anti-
Money Laundering Policy.  
Councillor McLennan stated that he had requested at the last meeting for
reference be made to the Whistleblowing Policy be added to the Financial
REgulations and Anti Money Laundering Policy but noted this was not included in
the updated documents.  
The Head of Governance, Strategy and Performance confirmed that he had
spoken to the Chief Financial Officer prior to the meeting regarding Councillor
McLennan's request and clarified that reference would be made in both
documents.  
Following consideration the Council unanimously agreed to approve:  
i) the revised Financial Regulations set out in Appendix 1;    
ii) the revised Authorisation Policy set out in Appendix 2;    
iii) the Grant Funding Procedures set out in Appendix 3; and    
iv) the Anti Money Laundering Policy set out in Appendix 4.       
12.         Elgin Parking Review 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of the recommendations following
feedback from stakeholder engagement held on 12 April 2023 and the subsequent
review of Elgin parking charges.  
The Chair moved the recommendations as printed.  This was seconded by
Councillor Gatt.  
Councillor Divers, seconded by Councillor Keith proposed to approve the revised
parking charges in high and medium turnover car parks as set out in Section 6 of
the report to Economic Development and Infrastructure Services Committee but to
make no change to low turnover car park charges.  
On the division there voted:
Page 13

Page 14

For the Motion (15)
Councillors Robertson, Gatt, Cameron, Colyer, Coull,
Gordon, Harris, Lawrence, Macrae, McBain,
Morrison, Mustard, Ross, Stuart and Warren 
For the Amendment (7)  Councillors Divers, Keith, Dunbar, Fernandes,
Leadbitter, Van Der Horn and Williams.    
Abstention (2) Councillors Bloomfield and McLennan  
Accordingly the motion became the finding of the meeting and the Council agreed
to:  
i) note the recommendation from Economic Development and Infrastructure
Services Committee on 5 September 2023 as set out in para 3.5 below;    
ii) note that the wider parking policy recommendations have been approved by
Economic Development and Infrastructure Services Committee; and    
iii) approve the revised parking charges as set out in para 6.12 of the report for
implementation from 1 January 2024.      
13.         Local Visitor Levy Report 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of the introduction of the Visitor
Levy (Scotland) bill in the Scottish Parliament and sought approval for the
recommendations.  
Councillor Dunbar moved to agree recommendations (i) to (iv) and to not agree the
principle of the Local Visitor Levy.  This was seconded by Councillor McBain.  
Councillor Leadbitter, seconded by Councillor Keith proposed the
recommendations as printed in the report.  
Councillor McLennan raised a point of order in terms of Standing Order 43 on the
order of the motion and the amendment.  
Councillor Robertson clarified that the motion was with Councillor Dunbar
seconded by Councillor McBain to agree recommendations (i) - (iv) and to not
support the principle of the Local Visitor Levy and the amendment was with
Councillor Leadbitter seconded by Councillor Keith to agree the recommendations
as printed in the report.  
The Head of Governance Strategy and Performance further added that it was
custom and practice of the Council that the first person who speaks is always the
motion regardless of whether they are in favour of the recommendations in the
report or not.  
On the division there voted:  
For the Motion (9) Councillors Dunbar, McBain, Bloomfield, Colyer,
Gatt, Gordon, Macrae, Mustard and Robertson    
Page 14

Page 15

For the Amendment (15)
Councillors Leadbitter, Keith, Cameron, Coull,
Divers, Fernandes, Harris, Lawrence, McLennan,
Morrison, Ross, Stuart, Van Der Horn, Warren and
Williams    
Abstention (0)    
Accordingly the amendment became the finding of the meeting and Council agreed:  
i) to note the details of the Visitor Levy (Scotland) Bill and the proposed
timetable through Parliament;    
ii) to note that an expert advisory group, facilitated by Visit Scotland will be
formed to offer opportunities for consultation on the Bill;    
iii) to note the requirement to conduct consultation and assess impacts on the
area before a final decision to implement a visitor levy can be made; 
iv) to note that the Highlands and Islands Regional Economic Partnership has
agreed to look at a consistent approach to consultation and implementation
of a visitor levy across the region; and    
v) to support in principle the concept of raising funds through a Local Visitor
Levy (LVL).   
14.         Community Asset Transfer - Grant Park Forres 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) inviting the Council to consider options in relation to an
asset transfer request made in respect of Trust Land within Grant Park, Forres.  
Councillor Lawrence stated that there is recognition within the Community based
on the consultations carried out to date that a skate park is needed in the area.  He
further added that the paper highlights a number of areas which would need to be
considered in determining a way forward and added that with the progression of
the new Forres Academy, although currently there are a lot of unknowns, one thing
that is known is that the current Forres Academy site will no longer have a school
on it and the area could be re-landscaped to provide a multi-sport, outdorr facility
which could include the skate park.  
In considering the above, Councillor Lawrence moved to amend option 2 in the
recommendations to agree the principle of the request and instruct officers to
evaluate the viability of an outdoor, multi-sport facility within the Forres Area,
consulting Forres Skate Park Initiative and other relevant community groups.
Council asks that this work is done following the Forres Learning Estate Review,
and any findings be reported to the relevant committee.  This was seconded
by  Councillor McBain.  
The Head of Governance, Strategy and Performance expressed caution in regards
to the motion to agree the request in principle, as the request refers to a specific
site, so if the Council were minded they would note the request from the group for
the space but wider consideration of other spaces were being considered.  
Page 15

Page 16

Councillor Divers sought agreement from Councillor Lawrence to remove the
words 'to agree in principle' from his motion so it read: 
to instruct Officers to evaluate the viability of an outdoor, multi-sport facility within
the Forres Area, consulting Forres Skate Park Initiative and other relevant
community groups. Council asks that this work is done following the Forres
Learning Estate Review, and any findings be reported to the relevant committee.  
Councillor Lawrence confirmed he was happy with this change.  
Following consideration Council agreed to:  
i) instruct Officers to evaluate the viability of an outdoor, multi-sport facility
within the Forres Area, consulting Forres Skate Park Initiative and other
relevant community groups. Council asks that this work is done following the
Forres Learning Estate Review, and any findings be reported to the relevant
committee; and    
ii) note that any future transfer would be subject to planning permission for the
proposed use being achieved. 
15.         Information Reports - if called in 
The Council noted that no information reports had been called in.  
16.         Question Time 
CCTV
Under reference to paragraph 12 of the minute of the meeting of 23 August 2023,
Councillor Warren sought a further update on the CCTV installations in all towns
and whether there would be more than 2 cameras installed in Buckie and Keith.  
In response, the Depute Chief Executive (Economy, Environment and Finance)
confirmed that there was 1 outstanding camera to be made fully operational and a
contractor was en-route to replace the faulty piece of equipment.  In regards to the
increase in the number of cameras already installed she was unaware of any
increase as the current number were as per the original specification for the
project.  
Points of Accuracy
Councillor McLennan sought to identify points of accuracy with the
minute.  Councillor Robertson confirmed that points of accuracy should be dealt
with at the point the previous minute is considered on the agenda, as the minute
had already been agreed as an accurate record of the meeting.  She further added
that on this occasion she would allow Councillor McLennan to raise his points but
in future to bring them to the Chair's attention at the correct point in the agenda.  
Councillor McLennan stated that at the last meeting he sought clarification on
whether the Council had a whistleblowing policy and asked for it to be linked to the
Financial Policies Review which was accepted by the Depute Chief Executive
(Economy, Environment and Finance) at the time and requested that this be
recorded in the minute.  
Page 16

Page 17

The second point related to the review of 2nd tier governance documents and
Councillor McLennan had sought clarification on the question marks in the table
and the Head of Governance, Strategy and Performance had stated that this was a
working document and would be updated as work on the 2nd tier governance
documents progressed.  
In response to the second point the Chief Executive confirmed that the document
was a working document and the answer given at the previous meeting still
stood.  The Head of Governance, Strategy and Performance confirmed that as the
updated documents were presented to Council for agreement the document would
be updated.  
Councillor McLennan sought agreement that the fact it is a working document be
minuted.  
The Democratic Services Manager confirmed that the discussion around the
question marks in the appendix was part of the general consideration of the report
and would not form part of the minute.  
The Head of Governance, Strategy and Performance confirmed that it is not within
his powers to change a minute once it has been agreed.  The only mechanism for
amending a minute is by Committee/Council approval.  
With regards to the question around the Whistleblowing Policy the Democratic
Services Manager confirmed that a number of Councillors had raised comments
on the Financial Policies which were not minuted, as part of the recommendations,
it was agreed that Councillors would provide comments to the Chief Financial
Officer by 15 September 2023.  
Gender Pay Gap
Under reference to paragraph 8 of the minute of the meeting of 23 August 2023
Councillor Macrae sought an update on any work to address the gender pay gap
within Moray.  
In response, the Chair confirmed that she had emailed Councillor Morrison and
was confident a response would be available imminently.  
The Head of Governance, Strategy and Performance urged members of the public
to complete the consultation currently ongoing which relates to the Council's
budget and also the Corporate Plan priorities.  This is an opportunity to have input
into the Council's priorities and the consultation is open until 2 October 2023.  
Notice of Motion - Lift the Ban
Councillor Fernandes sought agreement to consider the Notice of Motion - Lift the
Ban at the meeting of Moray Council on 4 October 2023.  
In response, the Chair confirmed that as the meeting was a special meeting, there
is no provision in Standing Orders for notices of motion on the agenda.  
Independent Inquiry into Alleged Abuse
Councillor McLennan stated that Russell Findley MSP called on the Scottish
Government to launch an independent inquiry into the alleged abuse of young
people at Celtic Boys Club and sought agreement from the Chair that there should
be an independent inquiry into unresolved allegations for child abuse, child
safeguarding mishandling and children's rights issues.  
Page 17

Page 18

In response, the Chair confirmed that this was not a subject she was aware of and
would not be prepared to make a comment at this stage.  
17.         Resumption of Meeting 
PRESENT  
Councillor Peter Bloomfield, Councillor Neil Cameron, Councillor Tracy Colyer,
Councillor Theresa Coull, Councillor John Divers, Councillor Amber Dunbar,
Councillor Jérémie Fernandes, Councillor Donald Gatt, Councillor David Gordon,
Councillor Juli Harris, Councillor Sandy Keith, Councillor Scott Lawrence,
Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor Paul McBain,
Councillor Neil McLennan, Councillor Shona Morrison, Councillor Bridget Mustard,
Councillor Kathleen Robertson, Councillor Derek Ross, Councillor John Stuart,
Councillor Draeyk Van Der Horn, Councillor Sonya Warren, Councillor Ben
Williams  
APOLOGIES  
Councillor James Allan and Councillor John Cowe  
IN ATTENDANCE 
Chief Executive, Head of Governance Strategy and Performance, Head of
Environmental and Commercial Services, Chief Financial Officer, Head of Human
Resources, ICT and Organisational Development, Acting Head of Education
Resources and Communities, Project Manager Education, Democratic Services
Manager and Caroline O’Connor, Committee Services Officer. 
18.         Re-alignment of Services 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) seeking agreement from the
Council for the re-alignment of the Education and Social Care Training Team
(Social Work Training Team) (with the exception of 1 FTE post) from Education,
Communities and Organisational Development to Moray Integration Joint Board
with effect from 1 February 2024.  
Following consideration the Council agreed to:  
i) note the current position, the drivers for change and the proposals for the
future of the Education and Social Care Training Team/Social Work Training
Team as outlined in the report; 
ii) approve the proposal to re-align the Education and Social Care Training
Team/Social Work Training Team (with the exception of 1 FTE Training
Facilitator post) from ECOD to MIJB with effect from 1 February 2024, with
the management responsibility transferring from the Head of HR, ICT and
Organisational Development to the Head of Service/Chief Social Work
Officer (MIJB); and reporting to the Council through the Chief Social Work
Officer annual report and agreed governance and accountability
arrangements;    
Page 18

Page 19

iii)  approve the proposal to re-align the 1 FTE Training Facilitator post from the
HR, ICT and OD service to the ASN service at a future date, remaining
within the Organisational Development team until such date; and    
iv)  note that if the proposals are supported, implementation will be taken
forward in accordance with the Council’s agreed Change Management
Policy and Procedures and subject to the appropriate workforce and trade
union consultation.   
19.         Learning Estate Programme - Elgin High School Capacity Expansion
Project Update [Para 8 and 9] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) informing the Council on the
current status of the Elgin High School capacity expansion and sought an
investment decision by Council to progress to full business case.  
Following lengthy consideration the Council agreed to :  
i) approve the outline business case and acknowledge the estimated capital
cost growth, to provide additional capacity at Elgin High School which
accounts for developer growth across both Elgin Academy and Elgin High
School Associated Support Groups; 
ii) the increase to the capital funding allocation for the project; and    
iii) note the estimated funding for the next phase of the project.   
20.         Business Administration Support for Early Learning and Childcare
and Primary Schools Update [Para 1] 
The meeting had before it a covering report by the Chief Executive informing the
Council on the progress and status of the Business Administration Review for
Early Learning and Childcare (ELC) considered by the Education, Children's and
Leisure Services Committee on 19 September 2023 and the outcomes from those
discussions (Appendix 1).  
Members were in agreement with the need to modernise the provision however all
felt that there should be no detriment to staff.  
The Chief Financial Officer confirmed that the projected saving from the project
had been carried forward for a number of years.  She further added that as Section
95 Officer she would give caution to agreeing no detriment to this group of staff as
it may lead to detriment for other groups of staff during other budget discussions
which have yet to take place.  
The Head of Governance, Strategy and Performance further advised the Council
that it will need to take difficult decisions in the next few months and raised
concern about dealing with this group of staff differently as the decision taken by
the Council at this meeting could be inconsistent with the decisions yet to be
made.  
Page 19

Page 20

The Chief Executive confirmed that estimated savings would not be realised this
year however Members could be assured that a service review would be carried
out but he could not guarantee there would be no detriment to staff.  
Councillor Gatt sought clarification on whether there was an opportunity to re-
engage the consultation to try and increase the response rate.  
The Acting Head of Education Resources and Communities confirmed that this
could be undertaken.  
Following lengthy consideration the Chair moved the recommendations as follows
and there being no one otherwise minded the Council agreed:  
i) the next stage of the project should be a Service Review taking account of
the findings of the Change Management Plan consultation process;    
ii) Administration staff, Head Teachers and Parent Council representatives be
involved in any Service Review Working Group;    
iii) a new Integrated Impact Assessment be undertaken that addresses all
equality issues including any parent/carer impacts; and 
iv) an update report on the review is presented to the next meeting of the
Education, Children's and Leisure Services Committee on 28 November
2023.     
Page 20

Page 21

MORAY COUNCIL 
Minute of Special Meeting of the Moray Council 
Wednesday, 04 October 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor Peter Bloomfield, Councillor Neil Cameron, Councillor Tracy Colyer,
Councillor Theresa Coull, Councillor John Cowe, Councillor John Divers, Councillor
Amber Dunbar, Councillor Jérémie Fernandes, Councillor Donald Gatt, Councillor
David Gordon, Councillor Juli Harris, Councillor Sandy Keith, Councillor Scott
Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae, Councillor Paul
McBain, Councillor Neil McLennan, Councillor Shona Morrison, Councillor Bridget
Mustard, Councillor Kathleen Robertson, Councillor Derek Ross, Councillor John
Stuart, Councillor Draeyk Van Der Horn, Councillor Sonya Warren 
APOLOGIES 
Councillor James  Allan, Councillor Ben Williams 
IN ATTENDANCE 
The Chief Executive, Depute Chief Executive (Economy, Environment and Finance),
Head of Governance, Strategy and Performance, Head of Environmental and
Commercial Services, Democratic Services Manager and Caroline O'Connor,
Committee Services Officer.   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Declaration of Member's Interests 
In terms of Standing Order 21 and 23 and the Councillors’ Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any
declarations of Member’s interests in respect of any item on the agenda.  
3.         Clarification on Point of Order from Moray Council on 27 September 2023 
Councillor Robertson stated that she wanted to address a point of order raised at the
last meeting of Moray Council under Question Time regarding the suspected use of the
word ‘teacher’ in response to her instructions about raising points of accuracy prior to
the minute being agreed. She understood Councillor Macrae who, at the time, believed
he heard the word at the meeting, was able to view the webcast once it was available
later that day. To be clear on review of the webcast, Councillor McLennan did not say
‘teacher’ and was not disrespectful to the Chair. Councillor Robertson understood that
a full apology had been sent by Councillor Macrae to Councillor McLennan that day.
However, as the statement was made in the public, she thought it important to
recognise that no disrespect was made by Councillor McLennan and that he had
Item 4b.
Page 21

Page 22

received a full apology as well as this public recognition of the error on Councillor
Macrae’s part and she now considered the matter dealt with.  
4.         Cloddach Bridge 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of the findings of the Pre-feasibility
Study undertaken on the potential repair of Cloddach Bridge.  
Councillor Robertson in thanking Members for attending the special meeting, moved to
defer the report until the next meeting of Moray Council on 25 October 2023 as she felt
that the Council making a decision at this meeting would not be fair on the Heldon
Community Council who were awaiting the outcome of the current round of funding
from Fred Olsen Renewables Rothes 1 Fund as referred to in the report.  The
consideration of applications would take place on 17 October 2023.  She further added
that herself and Councillor Mustard had met with the Community Council the previous
evening and the Community Council requested in the strongest terms a short
extension be given. Councillor Robertson also confirmed she had written to both the
UK and Scottish governments requesting the full funding or match funding respectively
and was awaiting replies.  
This was seconded by Councillor Gatt.  
The Head of Environmental and Commercial Services advised that by delaying the
decision on the report the extension given on the funding would reduce Officer time to
complete the Full Business Case (FBC) from 26 weeks to 23 weeks and although that
may not appear to be a long deferral, this could leave risks remaining about accuracy
of information in the FBC prepared to that point or lead to abortive spend if an FBC
could not be completed.  She further stated that in order to complete the FBC
prioritisation would need to given over work already programmed.  
Councillor Stuart sought clarification on whether information could be provided, should
the report be deferred to 25 October, in the report on the programmed works which
would be affected if the decision was to progress with the FBC as he felt this would
enable Members to make a more informed decision.  
The Head of Environmental and Commercial Services confirmed that this information
could be included should the report be deferred.  
Following further consideration the Council agreed to defer the report until the next
meeting of Moray Council on 25 October 2023 when a final decision would be made.       
Page 22

Page 23

MORAY COUNCIL 
Minute of Special Meeting of the Moray Council 
Wednesday, 25 October 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe, Councillor
John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith,
Councillor Scott Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Neil McLennan, Councillor Shona Morrison,
Councillor Bridget Mustard, Councillor Kathleen Robertson, Councillor Derek Ross,
Councillor John Stuart, Councillor Draeyk Van Der Horn, Councillor Sonya Warren,
Councillor Ben Williams 
IN ATTENDANCE 
Chief Executive, Depute Chief Executive (Economy, Environment and Finance),
Depute Chief Executive (Education, Communities and Organisational
Development), Head of Governance, Strategy and Performance, Chief Financial
Officer, Head of Environmental and Commercial Services, Head of HR, ICT and
Organisational Development, Head of Economic Growth and Development,
Consultancy Manager, Senior Engineer (Transportation), Principal Planning Officer,
Democratic Services Manager and Angela Pieri, External Auditor, Grant Thornton.   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Thanks 
The Council joined the Chair in thanking all Council staff who were on call over the
weekend of Storm Babet and passed on thoughts to colleagues in Aberdeenshire,
Angus and Perth and Kinross Councils on the challenges they face following the
previous weekend.  
3.         Declaration of Group Decisions and Members Interests * 
Councillor McLennan sought clarification from the Monitoring Officer on whether
Items 9 and 10 should be considered in the open session before Councillors consider
the motions.  
The Chair advised that the advice given was to deal with the declarations first and
then consider the adoption of the resolution.  
In terms of Standing Orders 21 and 23 the Council noted the following declarations:-
Item 4c.
Page 23

Page 24

In respect of the Conservative Group, the Council Leader confirmed that the
Conservative Members had discussed Agenda Items 6a, 9 and 10 and a group
decision had been taken on how members would vote.  
On behalf of the Scottish National Party, Councillor Leadbitter declared that the
Group Members had discussed Agenda Item 10 and a decision had been taken on
how members of the group would vote.  
Councillor Fernandes declared that he was a Trustee of the Chartered Institute of
Library and Information Professionals in Scotland and having sought advice from the
Monitoring Officer would remain in the meeting for the discussion of Item 9 on the
agenda.  
Councillor McLennan declared an interest in Item 9 on the agenda, having sought
advice from the Monitoring Officer, although there is a connection, he deemed the
connection by virtue of considering the budget setting in totality as per 5.4 of the
Code and from the advice taken, he is not required to step out of the discussions but
happy to take further advice from the Monitoring Officer if required.  
4.         Resolution 
The Chair sought agreement from the Council in terms of Section 50A (4) and (5) of
the Local Government (Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 9 and 10 of business on the
grounds that it involves the likely disclosure of exempt information of the class.  
Councillor Leadbitter sought to move Item 10 on the agenda into the open session of
the agenda as he questioned the reason for the report being confidential as the report
is in regards to a Council Policy and does not relate to specific individuals.  He further
added that he appreciated there is some reference to labour negotiations however felt
that a Council policy should be debated in public.  
The Chair sought advice from the Monitoring Officer on Items 9 and 10 on the
agenda.  
In response, the Monitoring Officer confirmed that in terms of legislation it is for
members to decide on where to discuss items on the agenda based on advice from
Officers.  He further added that the advice on Item 9 is that, as the report refers to
jobs at risk the report is in the confidential section.  Following the meeting today, the
Chair would hold authority to grant publicity rights on the information contained in the
report but there would still be sensitivity around some of the detail which would need
to be preserved during a consultation period.  His advice would be to keep the report
in the confidential section.  
In relation to Item 10 he advised that, before taking a view on whether the report is
taken out of the confidential section, Members may wish to hear from the Depute
Chief Executive (Education, Communities and Organisational Development) in
regards to labour relation issues around the consultation with unions.  
In response, the Depute Chief Executive (Education, Communities and
Organisational Development) confirmed that the reason for Item 10 being in
confidence was in relation to industrial relations matters and the consultation around
that.  She further added that it would be normal for an employer to consider their
employment position in private and then enter into negotiations with their employees
Page 24

Page 25

and their representatives before declaring their final position.  The report contains
some advice which she would have concerns around the risks that would then be
presented to the Council because the report gives Council advice on employment
issues that the Council would not want to share until a final position has been agreed. 
The Chair sought clarification from Councillor McLennan and Councillor Leadbitter if
they were prepared to accept the advice which had been given.  
Councillor McLennan sought advice from the Monitoring Officer on the difference
between confidentiality as stated in standing orders and exemption reasons as
detailed in the legislation.  He stated that in the Local Government Act 1973, Item 50,
50(a) 1 and 50(a)2 lists the reasons for reports being placed in the confidential
section and sought clarification on the specific parts that applies to each report before
making a decision.  
The Chair sought a short adjournment to allow Officers the opportunity to provide the
information sought.  
On the resumption of the meeting the Monitoring Officer advised that he had looked
at the 1985 Access to Information Act and stated that a Local Authority may by
resolution excluded the public from a meeting during consideration of an item of
business whenever it is likely in the view of the business to be transacted or the
nature of the proceedings that if members of the public were present during
consideration of that item of business there would be disclosure of them of the
exempt information.  He further added that the advice given earlier by himself and the
Depute Chief Executive (Education, Communities and Organisational Development)
still stands and the decision is taken on both items 9 and 10.  
The Depute Chief Executive (Education, Communities and Organisational
Development) requested that if Item 10 was to be heard in the open session, that she
be afforded the opportunity to redact sections of the report to reduce the risk to the
Council should the full report be published.  
The Chief Executive further added that in this instance members are acting as
employers in terms of the recommendations as set out in the report and it was
emphasised on Page 93 – Consultations – Trade Unions have been made aware of
this report and there will be a requirement for formal consultation on the position
determined by the Council if this is to change the current arrangements.  He further
added that if the decision is to take the report in public it would need to be redacted
before publishing publicly.  
Councillor Fernandes sought clarification on when the re-dacted report would come
back to Council. 
The Depute Chief Executive (Education, Communities and Organisational
Development) confirmed that she anticipated having the re-dacted paper available for
later in the meeting as she did not feel it would take much work to redact.  
The Chair advised that a vote would be taken on Item 9 and 10 separately and
sought a seconder for Councillor McLennan’s motion to move Item 9 into the open
session of the meeting.  Councillor Van Der Horn confirmed that he would second
Councillor McLennan in regards to Item 9 on the agenda. 
Councillor Macrae, seconded by Councillor Gatt proposed leaving Item 9 in the
confidential section of the agenda.
Page 25

Page 26

On the division there voted:  
For the Motion (5) Councillors McLennan, Van Der Horn, Cameron,
Fernandes and Warren
For the Amendment (20) Councillors Macrae, Gatt, Bloomfield, Colyer, Coull,
Cowe, Divers, Dunbar, Gordon, Harris, Keith, Lawrence,
Leadbitter, McBain, Morrison, Mustard, Ross,
Robertson, Stuart and Williams 
Abstention (0)    
Accordingly the amendment became the finding of the meeting and the Council
agreed to consider Item 9 on the agenda in the confidential section of the meeting.  
In regards to Item 10, Councillor Leadbitter moved to consider Item 10 in the open
section of the agenda, this was seconded by Councillor Stuart.  
Councillor Robertson, seconded by Councillor Gatt proposed considering Item 10 in
the confidential section of the agenda.  
On the division there voted:  
For the Motion (11) Councillors Leadbitter, Stuart, Cameron, Coull,
Fernandes, Harris, Lawrence, Morrison, McLennan, Van
Der Horn and Warren
For the Amendment (14) Councillors Robertson, Gatt, Bloomfield, Colyer, Cowe,
Divers, Dunbar, Gordon, Keith, Macrae, McBain,
Mustard, Ross and Williams
Abstentions (0)    
Accordingly the amendment became the finding of the meeting and the Council
agreed to consider Item 10 in the confidential section of the agenda.  
The meeting resolved that in terms of Section 50A (4) and (5) of the Local
Government (Scotland) Act 1973, as amended, the public and media representatives
be excluded from the meeting for Items 9 and 10 of business on the grounds that it
involves the likely disclosure of exempt information of the class.  
Para number of the
minute Para Number of Schedule 7a
14 Para 1
Information in relation to staffing matters
15
Para 11
Information relating to any consultations or negotiatons
in connection with any labour relations. 
5.         External Audit - Annual Report to Members on 2022-23 Audit 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) providing the Council with a copy of the External Auditors
Annual Audit Report to Council on the 2022/23 accounts.  
The External Auditor provided a review of the findings in the report.
Page 26

Page 27

Following consideration the Council unanimously agreed to note the contents of the
Annual Audit Report 2022/23.    
6.         Audited Annual Accounts 1 April 2022 to 31 March 2023 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) which submitted to the Council the Audited Annual
Accounts for the Moray Council for the year ended 31 March 2023.  
Following consideration, the Council unanimously agreed to:  
i) note the Audited Annual Accounts for the financial year 2022/23; and    
ii) approve the Annual Accounts being signed, have regard to the Annual Report
from the external auditor considered earlier at this meeting.   
7.         Audited Connected Charities Audited Annual Accounts 1 April 2022 to
31 March 2023 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) submitting to the Council the audited Annual Accounts for
Moray Council's Connected Charities for the year ended 31 March 2023.  
Following consideration the Council unanimously agreed to approve the audited
Annual Accounts for the Connected Charities for the financial year 2022/23.  
8.         Best Value Thematic Review 2022 - 2023 
The meeting had before it a report by the Chief Executive asking the Council to consider
the Best Value Thematic Review Report on Moray Council by Grant Thornton ("the
auditors") and the associated Improvement Action Plan.  
Councillor McLennan suggested some amendments to the wording on pages as
detailed:  
Page 136 -  Councillor Chris Price resignation, amend to say a resignation of a member
rather than from an opposition party. 
Page140 - bottom line of page "ensure committee members are clear on the remit of
the Audit and Scrutiny Committee." Remove or amend sentence as without speaking
to all members of Audit and Scrutiny this statement may not be accurate. 
Page 145 - top line on the page.  Gives impression the Council only require to work
alongside communities as a result of pandemic recovery.  May be better to say
enhanced working alongside communities?    
The External Auditor agreed to amend in the report in light of Councillor McLennan's
comments prior to final sign off.  
Following further consideration the Council unanimously agreed:  
Page 27

Page 28

i) to welcome the areas of strength recognised in the Best Value Thematic
Review report on "Leadership and Development of New Strategic Priorities" in
Appendix 1 including the work undertaken in relation to community
engagement in forming the new Corporate Plan;    
ii) to note the findings, seeking clarification on points as required; and    
iii) the Improvement Action Plan in Appendix 1 of the report.  
9.         Medium to Long Term Financial Strategy 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) asking Council to consider an updated financial strategy to
facilitate medium to long term financial planning.  
Following consideration the Council unanimously agreed to approve the updated
Medium to Long Term Financial Strategy at Appendix 1 to the report.  
10.         Cloddach Bridge 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of the findings of the Pre-feasibility
Study undertaken on the potential repair of Cloddach Brigge.  
Councillor Mustard informed the Committee that at a meeting of Heldon Community
Council the previous evening, it had been confirmed that the Community had secured
£120,000 in funding to be put towards the full business case.  
Councillor Mustard therefore proposed that the Council:  
i) note the findings of the pre-feasibility study; and 
ii) progress to the Full Business Case for the repair of Cloddach Bridge to be
funded with the £120,000 from the Community and the balance funded by the
Council.  
This was seconded by Councillor Macrae.  
Councillor Cameron stated that he could not disagree with what Councillor Mustard
and Councillor Macrae had said other than the cost and reminded Councillors that
they are elected as Councillors for the whole of Moray and proposed, seconded by
Councillor Lawrence that the Council:  
i) note the findings of the pre-feasibility study; and      
ii) agrees that a full business case for the repair of Cloddach Bridge should not be
funded, as this work is contrary to the decision of Economic Development and
Infrastructure Services Committee on 7 February 2023 (para 11 of the minute
refers) and does not comply with the Council policy on Bridge Maintenance
Prioritisation. 
In advance of the vote, the Monitoring Officer advised that the Council in responding
to any allegation of a breach of duty of Care, would need to demonstrate that it had a
robust priority system to show its budget was applied to infrastructure on a planned
and prioritised basis.
Page 28

Page 29

He further added that there would be risk to the Council in departing from an agreed
priority system.  
On the division there voted:  
For the Motion (14) Councillors Mustard, Macrae, Allan, Bloomfield,
Colyer, Cowe, Divers, Dunbar, Gatt, Gordon, McBain,
Robertson,  Ross and Williams     
For the Amendment (12)  Councillors Cameron, Lawrence, Coull, Fernandes,
Harris, Keith, Leadbitter, McLennan, Morrison, Stuart,
Van Der Horn and Warren     
Abstention (0)    
Accordingly the motion became the finding of the meeting and the Council agreed:  
i) note the findings of the pre-feasibility study; and 
ii) progress to the Full Business Case for the repair of Cloddach Bridge to be
funded with the £120,000 from the Community and the balance funded by the
Council.  
Councillor Allan joined the meeting during the consideration of this item. 
11.         UK Government Our Long Term Plan for Towns 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) informing the Council of the announcement on 1 October
2023 that Elgin is one of 55 towns in the UK to receive £20 million funding towards
town centre regeneration projects from the UK Government and to agree that the
Head of Economic Growth and Development liaises with the UK and Scottish
Governments to progress governance arrangements to establish a Town Board.  
Following consideration the Council agreed:  
i) to note the award of £20million funding for Elgin from the UK Government
Long-Term Plan for Towns;    
ii)  that the Head of Economic Growth and Development liaises with the other 6
Scottish towns and local authorities which have been awarded funding to share
best practice;    
iii) that the Head of Economic Growth and Development establishes an initial
informal group as per para 4.8 and suitable interim governance structures;    
iv) that the Head of Economic Growth and Development proposes to the initial
group that the Elgin City Centre Masterplan and Delivery Programme are
updated to inform the Long Term Plan, and if this is supported, delegated
authority is granted to progress that work ahead of formal constitution of the
Town Board; and    
v) a further report be prepared for Council when further details on the staffing and
financial implications surrounding the funding are available.
Page 29

Page 30

12.         Moray Council Permission for Hospitality Businesses to Place
Furniture and Non Furniture on Public Footways 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking approval for the application process, charges and
guidance for the placement of furniture (tables and chairs) and non-furniture items on
the public footway for restaurants, cafes and public houses.  
In terms of Standing Order 85, the Chair sought agreement from the Council to
suspend standing order 77 in order to conclude the consideration of the item.  This
was unanimously agreed.  
Councillor Leadbitter moved to agree the recommendation and for a report to come
back in 18 months time to review the process. 
Following consideration the Council unanimously agreed:  
i) to approve the application process, charges and guidance for the placement of
furniture and non-furniture items on the public footway to enable outside dining
for restaurants, cafes and public houses; and    
ii) a report would come back to the relevant Committee review the process in 18
months time.  
13.         Resumption of Meeting 
PRESENT  
Councillor James  Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe, Councillor
John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith,
Councillor Scott Lawrence, Councillor Graham Leadbitter, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Neil McLennan, Councillor Shona Morrison,
Councillor Bridget Mustard, Councillor Kathleen Robertson, Councillor Derek Ross,
Councillor John Stuart, Councillor Draeyk Van Der Horn, Councillor Sonya Warren,
Councillor Ben Williams.  
IN ATTENDANCE 
Chief Executive, Depute Chief Executive (Economy, Environment and Finance),
Depute Chief Executive (Education, Communities and Organisational Development),
Head of Governance, Strategy and Performance, Chief Financial Officer, Head of HR,
ICT and Organisational Development, and the Democratic Services Manager.  
14.         Short to Medium Term Financial Plan [Para 1] 
The meeting had before it a report by the Depute Chief Executive (Economy,
Environment and Finance) seeking to approve proposed savings, subject to
consultation where appropriate, for implementation in 2023/24, 2024/25 and 2025/26,
in accordance with the Council’s Short to Medium Term Financial Strategy.  
Page 30

Page 31

Following advice from the Monitoring Officer, Councillor McLennan sought a short
adjournment to allow himself and the Monitoring Officer to seek clarity from the
Standards Commission on a potential declarable interest.  
Adjournment of the Meeting
The Chair, in wishing to be able to consider the item, agreed to the short
adjournment.  
Resumption of the Meeting
On the resumption of the meeting the Chair advised the Council that Appendix 1
would be split into 2 sections for consideration.  Appendix 1 would seek approval for
the whole document with the exception of Line A 20-5 which would be considered
separately as Appendix 1a.  
Councillor McLennan confirmed that, following his earlier declaration and additional
advice from the Monitoring Officer and Standards Commission, he had a close
connection with someone who would be impacted by the particular proposal in
Appendix 1a.  
As the Chair had allowed this item to be considered separately from the wider
Appendix 1 proposals this enabled Councillor McLennan to formally declare his
interest in relation to Appendix 1a.  He advised the Chair that he would step out of the
meeting for consideration of that particular item. 
The Chief Executive provided some guidance for Members in relation to proposals
which may emerge as part of the consideration of the meeting.  
He stated that Officer reports aim to provide members with sufficient financial and risk
information for a fully informed decision to be taken with published agendas ensuring
that fair notice is given of any decision which needs to be taken.  
Motions from the floor are an important part of the democratic process but could lead
to unplanned/unintended financial risk and consequences.  He advised that to
address this questions in 3 areas should be asked:  
1. Council Wide Financial Priorities - how would the proposal affect the Council's
revenue budget/capital plan - is it affordable? 
2.
Service Priorities with a fixed budget - could the proposal be inconsistent with
agreed priorities?  Could the proposal impact on deliverability from agreed
priorities which have already been established?
3.
Officer Time - by promoting one project or priority this could reduce the time
officers have to spend on other projects and priorities.  Have the relative merits
been evaluated?  Put another way, what else may need to be stopped and for
how long?  
He added that if the answer to any of those questions was not clear to members then
advice would be that it is unwise to proceed to a decision without further information.  
He advised that the Chair has the power to declare a motion incompetent for the
reasons stated, however a further report could be requested to provide more detail,
but the time this would take in terms of the issue about officer time previously
mentioned should be considered.  
He continued to add that in terms of the Council's Standing Order 49 - members need
to have sufficient information before them to come to a reasoned and balanced
Page 31

Page 32

decision and the Scottish Government Guidance - Right First Time asks if Members
have taken necessary considerations into account and will the decision be
reasonable.  
The Monitoring Officer also reminded Members that in terms of Standing Order 73a,
the papers in front of them are confidential as they relate to staffing matters and
asked Members to respect the Confidentiality.  He further added that the Chair will
authorise a press release following the meeting.  
Councillor Robertson, in thanking Members and Officers for the collaborative working
in getting to this point, moved the recommendations as printed in the report with
regards to Appendix 1.  This was seconded by Councillor Gatt.  
Councillor Leadbitter echoed the comments made by Councillor Robertson around
the collaborative working and stated that he had no issues with recommendations (i)
to (vi) in relation to Appendix 1a however, expressed concern about  recommendation
(vii) and stated he would not be comfortable supporting it as it currently
stands.  Councillor Leadbitter, seconded by Councillor Fernandes proposed agreeing
recommendations (i) to (vi) only.  
The Chief Executive confirmed that there is a significant risk to the Council if the
proposals were not agreed today.  The Scottish Government will bot be publishing
their budget until 19 December 2023 and the Council need to make decisions in
advance of that announcement.  
The Chief Financial Officer also added that the Council is running on a structural
deficit, namely living in an overdraft.  
The Depute Chief Executive (Education, Communities and Organisational
Development) stated that it was important to have an open discussion with the public
on the future of Libraries and Sport and Culture Services and asked whether, if
reference to Appendix 2 was removed, would that be acceptable to Councillors
Leadbitter and Fernandes to agree all the recommendations.  
Adjournment of the Meeting
In response to the comments from the Depute Chief Executive (Education,
Communities and Organisational Development) Councillor Leadbitter sought a short
adjournment to discuss the proposal.  
Resumption of the Meeting
On the resumption of the meeting, Councillor Leadbitter confirmed that himself and
Councillor Fernandes would be happy to accept the recommendations, subject to the
removal of reference to Appendix 2 in recommendation (vii). and withdrew his
amendment.  
With there being no one otherwise minded the Council unanimously agreed to:  
i) note the financial update;    
ii) note the savings options set out in Appendices 1 and 2, having due regard to
the Integrated Equalities Assessments summarised in Appendix 4;    
iii)  note the results of the stage 1 Public Engagement on the budget as set out in
section 5 of the report and Appendix 5;    
Page 32

Page 33

iv) the greatest level of savings possible, subject to State 2 public
communications as indicated in Appendix 1 and/or workforce consultation as
required;    
v) the investment of £105,000 revenue to be funded from Council reserves ear-
marked for Transformation and £60,000 additional capital required to secure
savings from the closure of 2 corporate offices as set out in Appendix 1;    
vi) note the position as set out in the Budget on a Page at Appendix 3, instructs
that work continues to reduce the remaining budget gap, with savings options
being brought forward at the earliest opportunity; and    
vii) as part of the overall savings, in order to advance the above, agreed to
commence public and workforce engagement on the possible future re-
modelling of Libraries and Sport and Culture Services (Pools and dry facilities)
and report back to the Council on lower cost services options for future
consideration, including income generation.  
Councillor McLennan left the meeting at this juncture.  
The Council considered Appendix 1a - A20-5 in the savings proposals.  As there was
no-one otherwise minded the Council unanimously agreed to accept the savings
proposal at A20-5 with those already agreed Appendix 1.  
Councillor McLennan rejoined the meeting following the conclusion of this item.    
15.         No Compulsory Redundancy Principle [Para 11] 
The meeting had before it a report by the Depute Chief Executive (Education,
Communities and Organisational Development) inviting the Council to consider a
principle of no compulsory redundancies (NCR) and whether to establish that as a
policy position reflected in an amended redundancy policy if agreed.  
Councillor Gatt moved to agree recommendation 3.1 (i) and (ii) and reject
recommendation 3.2.  He stated that the current policy is exceedingly good and
compulsory redundancy is always the last resort.  This was seconded by Councillor
Mustard.  
Councillor Fernandes stated that No Compulsory Redundancies is the policy of the
SNP, Labour and Green Parties and he felt it was important for electors who have
voted on party policy to see this being agreed and proposed, seconded by Councillor
Leadbitter, to agree to adopt a policy of no compulsory redundancies as per Appendix
B and paragraph 5.26 of the report.    
On the division there voted:  
For the Motion (12) Councillors Gatt, Mustard, Allan, Bloomfield, Cowe,
Colyer, Dunbar, Gordon, Macrae, McBain, Robertson
and Ross, 
For the Amendment (13) Councillors Fernandes, Leadbitter, Cameron, Coull,
Divers, Keith, Lawrence, Harris, McLennan, Morrison,
Stuart, Warren and Williams    
Page 33

Page 34

Abstention (1) Councillor Van Der Horn  
Accordingly the Amendment became the finding of the meeting and Council agreed
to: 
i) Approve the amended redundancy policy statement at Appendix B for
incorporation into change management procedures, subject to consultation
with recognised trade unions; 
ii) Approve a budget of up to £40,000 per year to be allocated from reserves for a
post within the HR service to operate the supernumerary and redeployment
process; and  
iii) Note that a further report on the use and terms of voluntary exit measures may
be required in the context of the new NCR policy position and if so will be
brought to the council for consideration 
Page 34

Page 35

NOTICE OF MOTION TO MORAY COUNCIL ON WEDNESDAY 6
DECEMBER 2023 
Right to work for asylum seekers 
Lift the Ban is campaigning to restore the right to work for everyone waiting for more
than 6 months for a decision on their asylum claim. 
People seeking protection in the UK should be able to work and make the most of
their potential, to provide for themselves and their families, similar to Ukrainian
refugees who do already have the right to work. 
Restrictions on right to work can lead to extremely poor mental health outcomes and
waste of potentially invaluable talents and skills, both for the local economy and
wider society. 
The Council’s own risk register lists Human Resources (People) at Very High with a
likelihood of 5 out of 5, and that it is “difficult to recruit in a range of areas including
certain subject teachers, vehicle technicians, specialist professional posts, senior
management, clerical and administrative roles, temporary and relief staff, and
community care employees.” 
Allowing people seeking asylum the right to work would lead to positive outcomes for
individuals as well as benefiting public and private sector organisations in the region
who are struggling with recruitment and retention. 
A majority of Scots believe that Scotland needs to attract more people through
immigration to work in key industries and public services. 
In 2022 the Shortage Occupational List was expanded to include positions like social
care, nursing, opening the possibility of employment for people seeking asylum.
Council welcomes the UK Migration Advisory Council report in March 2023 into
labour shortages in the construction and hospitality sectors and the potential use of
the immigration system as a response, with a further report following a call for
evidence due to be published this autumn. 
Action 
Council therefore agrees: 
● To confirm support for the Lift the Ban campaign and our belief that the right
to work is a fundamental human right; 
Item 6.
Page 35

Page 36

● To formally join the Lift the Ban coalition alongside other local authorities,
following the lead of Glasgow who joined earlier this year; and 
● To instruct the Council Leader to write to the UK Government urging that they
introduce legislation giving people seeking asylum the right to work, setting
out the significant workforce pressures Moray is currently facing. 
Financial Consequences 
• There are no financial consequences. 
Proposed by Councillor Fernandes
Seconded by Councillor Leadbittter 
Date Motion Submitted: 5 September 2023 
Page 36

Page 37

Dear 
I am writing on behalf of the Moray Council to ask that the UK Government restore
the right to work for people seeking asylum who have been waiting for a decision on
their asylum claim for six months. 
Under the UK Government’s current system people seeking asylum are effectively
banned from working. They can only apply to the Home Office for permission to
work if they have been waiting for a decision for over 12 months and only for jobs
that are on the Government’s restricted Shortage Occupation List. 
This policy is in nobody’s interest. 
At present, people who have risked everything to find safety in the UK are forced to
live on just £8.24 per week to meet all essential living costs, forcing them into
destitution. Instead, people could be using their skills, contributing to the economy
through increased tax revenue and consumer spending, and saving money spent on
asylum support. 
This is particularly the case in Moray where we are experiencing workforce shortages
in various sectors such as transport, agriculture and the food and drink industry, as
well as in the Moray Council itself, where we are struggling to recruit in a range of
areas including certain subject teachers, vehicle technicians, specialist professional
posts, senior management, clerical and administrative roles, temporary and relief
staff, and community care employees. 
You will be aware that there are currently around fifty people seeking asylum hosted
in the Eight Acres Hotel in Elgin. They are not allowed to work while they are waiting
for their claim to be processed. 
There is significant public support for reform and the UK is currently a major outlier
compared to other countries across North America and Europe, as in almost all other
cases people are able to support themselves at an earlier stage with fewer
restrictions. 
People who have risked everything to find safety in the UK to have the best chance
of contributing to society and integrating into our communities. It is not effective to
waste the talents of our population. 
I would be grateful to hear your views on this matter, and I am looking forward to
your response. 
Yours sincerely, 
Page 37

Page 38

Page 38

Page 39

__________________________________________________
NOTICE OF MOTION
TO MORAY COUNCIL
WEDNESDAY 6 DECEMBER 2023 
Business Rates Incentivisation Scheme 
Preliminary issues
None.
Background
The non-domestic Business-Incentivisation-Scheme (BRIS/NDRIS) was suspended
in 2021 (due to Covid) and has not been re-instated. 
This can (and did) generate extra cash for local authorities, who exceeded a
business rates target as set by the Scottish Government.  Anything gained over that
target was split 50/50 between the local authority and the Scottish Government. 
This could generate typically for an authority of our size anything from £1 - £2m
(2019/21).
Action
We ask the Council to send the attached letter to the Deputy First Minister in her
capacity for Cabinet Secretary for Finance; which requests that the non-domestic
rates incentivisation scheme is reinstated. 
Financial implications to Moray Council in producing this report and sending
the attached letter. 
None. 
References:
https://www.gov.scot/publications/report-barclay-review-non-domestic-rates/ 
Proposer:  Cllr Gordon
Seconder: Cllr McBain 
Date Motion Submitted: 6 November 2023
Item 7.
Page 39

Page 40

Draft Letter: 
To the Deputy First Minister (and Cabinet Secretary for Finance). 
Dear Deputy First Minister,
In 2021 the Business Rates Incentivisation Scheme (BRIS) was suspended (due to
Covid) and has not been re-instated.  It was established in 2012 and revised in 2015. 
This scheme enabled local authorities to benefit with extra cash if they exceeded a
target set for them.  It was an incentive for local authorities to raise their NDR tax
base without any resulting deduction from grant aid. 
The extra cash generated by a LA in this way was then split 50/50 with the Scottish
Government. 
The generation of more business rates and such a scheme does not affect
businesses in any way; it does not affect the non-business taxpayer; and it is money
that the Scottish Government does not have to find from the block grant; money that
could provide much needed extra support to local authorities in these cash-restricted
and inflationary times.   
Moray Council ask you to re-instate the Business Rates Incentivisation Scheme. 
Yours sincerely 
Page 40

Page 41

REPORT TO: MORAY COUNCIL ON 6 DECEMBER 2023 
SUBJECT: APPROVED MINUTES OF MORAY INTEGRATION JOINT BOARD 
BY:  CHIEF OFFICER, HEALTH AND SOCIAL CARE MORAY 
1. REASON FOR REPORT 
1.1 To inform the Council of the latest approved minutes of the meetings of the
Moray Integration Joint Board. 
1.2 This report is submitted under Section II (22) of the Council's Scheme of
Administration relating to the Moray Integration Joint Board (MIJB). 
2. RECOMMENDATION 
2.1 The Council is invited to consider and note the content of this report. 
3. BACKGROUND 
3.1 The MIJB was established on 6 February 2016 under the terms of the Public
Bodies (Joint Working) (Scotland) Act 2014 with full delegation of functions
and resources to enable integration of primary and community health and
social care services effective from 1 April 2016. The MIJB is a separate legal
organisation and acts as principal in its own right. 
The principal ambitions of health and social care integration are to: 
• Support the improvement of the quality and consistency of services for
patients, carers, service-users and their families.
• Provide seamless, joined-up quality health and social care services in
order to care for people in their homes or a homely setting where it is
safe to do so.
• Ensure resources are used effectively and efficiently to deliver services. 
3.2 The approved minute from the MIJB meeting held on 29 June 2023, which
was accepted as a correct record of the meeting on 28 September 2023, can
be found here:
https://moray.cmis.uk.com/moray/CouncilandGovernance/Committees/tabid/6
2/ctl/ViewCMIS_CommitteeDetails/mid/381/id/18/Default.aspx .  A few key
highlights from the meeting for the Moray Council to note were, the MIJB:
Item 8.
Page 41

Page 42

29 June 2023
• Noted a report by the Chief Officer (CO) detailing the CO activities that support the
delivery of the MIJB’s strategic priorities.
• Delegated authority to the CO and the Standards Officer to enter into the joint
agreement arrangements with the North East Alliance, to work with Public Health
Scotland for the benefit of Moray residents on behalf of the Moray Health and
Social Care Partnership.
• Noted the unaudited revenue outturn position for the financial year 2022/23, and
noted the impact of the outturn on the 2023/24 revenue budget.
• Approved repayment to NHS Grampian of £1,178,000 of the unused earmarked
Covid reserves and approved the issue of Directions to NHS Grampian and Moray
Council.
• Noted the unaudited Annual Accounts prior to submission to the external auditor,
noting all figures remain subject to audit.  Noted the Annual Governance
Statement contained within the unaudited Annual Accounts.
• Approved the updated Local Code of Corporate Governance which supports the
Annual Governance Statement and approved the self-assessment of good
practice, as set out in the CIPFA ‘Audit Committee Member in Local Authority’
2022.
• Noted the progress made in relation to the development of health and social care
provision across the Lossiemouth locality; in partnership with the local community
and practitioners. 
• Noted a report detailing the progress from the Moray Growth Deal investment on
Health and Social Care Transformation in Moray.
• Approved the MIJB Strategic Priorities and the plan for developing a Joint
Strategic Needs Assessment. 
• Noted the findings of the 10 week test of change – Moray Daytime Unscheduled
Care Service – and the recommendations regarding a sustainable model solution.
• Deferred the report titled Childrens Services Self Directed Support Budget
Overspend to the next meeting of the Board, to allow for more information to be
provided.
• Noted an update related to older adult psychiatry / mental health services.
• Approved the publication of the Annual Performance Report 2022/23 by 31 July
2023. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
This report forms part of the governance arrangements of MIJB; good
governance arrangements will support the Board to fulfil its objectives. 
(b) Policy and Legal
There are no policy or legal implications associated with this report. 
(c) Financial implications
There are no financial implications associated with this report. 
(d) Risk Implications
There are no risk implications associated with this report. 
Page 42

Page 43

(e) Staffing Implications
There are no staffing implications arising from this report. 
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required as there is no change
to policy and procedures resulting from this report. 
(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity implications arising from this
report. 
(i) Consultations
Consultation on this report has taken place with Corporate Manager,
Health and Social Care Moray who is in agreement with the content in
relation to their area of responsibility. 
5. CONCLUSION 
5.1 This report provides a summary of the business addressed by the MIJB
at their meeting on 29 June 2023. 
Author of Report: Isla Whyte, Interim Support Manager, Health and Social
Care Moray
Background Papers: available online 
Ref: SPMAN-305227695-109 
Page 43

Page 44

Page 44

Page 45

REPORT TO:   MORAY COUNCIL ON 6 DECEMBER 2023 
SUBJECT: REVENUE BUDGET MONITORING TO 30 SEPTEMBER 2023 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 To advise Committee of the revenue budget monitoring position to 30
September 2023 and the current estimated out-turn for 2023/24. 
1.2 This report is submitted to Council in terms of Section III B (10) of the
Council’s Administrative Scheme relating to monitoring current revenue
expenditure against approved budget. 
2. RECOMMENDATION 
2.1 It is recommended that Committee considers and notes: 
(i) the budget monitoring position of £332,000 over budget for 2023/24
as at 30 September 2023; 
(ii) that this position consists of an underspend on Devolved School
budgets of £613,000, an underspend of £459,000 on Children’s
Services, an underspend of £505,000 on Environmental Services and
an overspend on Social Care services delivered on behalf of the
Moray Integration Joint Board (MIJB) of £1,995,000 and an
underspend on other services of £86,000; 
(iii) movement of a £2,873,000 increase in General Revenue Grants, as
detailed in paragraph 3.5; 
(iv) the current estimated out-turn for 2023/24 of an overspend in
Council services including Health and Social Care of £1,235,000 after
adjusting for the cost sharing agreement with NHS for MIJB, with
underspends in loans charges of £885,000 and slippage in use /
reduction in requirement of provisions of £786,000 resulting in an
overall £436,000 underspend and a decrease in the planned use of
Council reserves by £463,000 from that budgeted for; and 
(v) the emerging budget pressure noted in paragraph 6.2.
Item 9.
Page 45

Page 46

3. BACKGROUND 
3.1. When the revenue budget for 2023/24 was approved by Moray Council on
1 March 2023 (paragraph 5 of the minute refers), General Revenue Grant of
£193,416,000 was estimated for the year, based on the latest amount notified
to the Council and including estimates for further distributions of grant during
the year. Council Tax receipts of £49,574,000 were anticipated.  Budgeted
expenditure of £260,840,000 was agreed, and this required projected use of
£17,850,000 of the Council’s Ear Marked Reserves to balance the budget.   
3.2. In addition to the Council’s core budget, monies allocated to schools through
the Devolved School Management (DSM) scheme and not spent are brought
forward from previous years.  The DSM balance brought forward in 2023/24
was £853,000 (2022/23 £1,288,000) and on 13 June 2023 Corporate
Committee approved an additional £33,000 to be retained over and above the
permitted DSM allowances, for planned spend at two schools which were not
completed during the academic year due to circumstances out with their
control (para 10 of the minute refers).  This budget has been reallocated from
Covid reserves.  Unused Pupil Equity Fund of £757,000 received in 2022/23
and £36,000 funding for nursery snacks and fundraising have been carried
forward into 2023/24 in accordance with the grant conditions. 
3.3. On 28 June 2023 Council approved additional expenditure of £2,158,000 to
be funded from Ear-marked Reserves for Covid.  All of these adjustments
were posted to departments during quarter 1 (para 13 of the minute refers). 
3.4. Additional funding from Covid reserves of £421,000 are reflected in budgets
for quarter 2, including Bus Revolution revenue budget of £74,000, a cost of
living contribution to Moray Food Plus of £16,000, temporary ASN costs of
£299,000 from the additional £1,100,000 approved by Council on 28 June
2023, and the £33,000 DSM adjustment for two schools explained in
paragraph 3.2 above.  Other adjustments of £639,000 reflected in the budgets
are for other service specific earmarked reserves set up at 2022/23 year end
closedown for funding received that required carried forward and used in
2023/24. 
3.5. Variations to General Revenue Grant (GRG) amounting to £2,873,000 have
been notified and actioned. This consists of additional funding for summer
holiday activities of £68,000, Employability £264,000, and £331,000 to support
the resettlement and wider integration of displaced Ukrainians.  Funding
passported to the MIJB has also been actioned: £1,882,000 for Real Living
Wage and £328,000 for Personal and Nursing Care. 
3.6. A contribution towards the recurring costs of the final Scottish Negotiating
Committee for Teachers (SNCT) pay agreement for 2022-24 of £2,204,000
has been confirmed which will reduce the required use of reserves. 
3.7. With these adjustments to use of reserves and GRG, the Council’s overall
General Services revenue budget currently stands at £268,781,000.  
Page 46

Page 47

3.8. Reconciliation of the movements in the base budget from that which was
approved by the Moray Council on 1 March 2023 is shown in APPENDIX 3
and allocations to departments from the provisions for Inflation and
Contingencies, Additional Costs and Savings are listed in APPENDIX 4. 
4. BUDGET POSITION 
4.1 APPENDIX 1 summarises the current position for each service area,
comparing the actual expenditure with the budget to 30 September 2023. 
4.2 Overall the budget position at 30 September 2023 is expenditure over budget
to date of £332,000 or 0.3% of budget to date, which includes services
delivered on behalf of the Moray Integration Joint Board (MIJB).   
4.3 The principal areas of overspend and underspend across the Council are
summarised below. 
4.4 In Education, Resources and Communities there is an underspend of
£105,000. Much of this relates to the over achievement of income in Sport and
Leisure services against an income budget reduction during Covid.  The
income budget was due to be increased in phases over 2023/24 and 2024/25
but recovery has been quicker than expected and the full income budget will
be reinstated this year.  Libraries has an overspend on licences of £57,000
and under achievement of income from sales, fees and charges of £14,000.
Licences is a non recurring overspend due to the timing of licence renewals;
there is a small saving in libraries licence fees of £4,000 expected in 2024/25. 
4.5 Children’s Services has an underspend of £459,000 to date, an increase from
quarter 1.  A contract for residential care for children with disabilities has
ended due to the transition to adult services of the person cared for, giving a
contract underspend of £272,000.  Out of Area placements are £46,000 under
budget and, as was similarly reported last quarter, this can quickly fluctuate
given the cost per week of a placement.  Adoption and fostering
fees/allowances are under budget by £90,000, and throughcare/aftercare
payments are also under budget, by £15,000 at quarter 2.  Within Area
Teams, Self Directed Support (SDS)/direct payments and legal fees are
currently £52,000 and £10,000 over budget respectively, while fostering home
to school transport are £14,000 under budget. 
4.6 Education has a £703,000 under spend to date.  Devolved School budgets
are underspent by £613,000 at the end of the second quarter; £130,000 in
primary schools and £483,000 in secondary schools.  There is flexibility in
DSM budgets to allow for planning for the sessions ahead and where spend is
planned on the academic year.  There are other minor variances in Schools
and Curriculum Development, including underspends of free sanitary products
£14,000 and clothing grants £11,000.  Overspends in central supply of
£71,000 which is difficult to forecast due to being cover for maternity and sick
leave, and an insurance excess payment of £58,000.  In ASN there are
underspends including speech and language therapy of £25,000, travel and
training. 
Page 47

Page 48

4.7 Environmental and Commercial Services are presenting a £505,000
underspend to date across services; Waste has a net underspend of
£180,000; £160,000 of this is for Waste Disposal.  As waste is now being
transported to the new Energy from Waste plant in Aberdeen, the costs are
offset by underspends on Landfill Tax and Leachate costs.  During this
transitional year the budgets will require ongoing monitoring and review,
including the impact of reduced gate fees from electricity generated by the
plant.  There is also £18,000 underspend on energy costs within Waste. 
Harbours income is ahead of target by £175,000, with spend of £30,000 for
management and legal fees at Buckie Harbour reducing the net underspend. 
Consultancy is under spent by £272,000 in total which is partially due to the
£200,000 grant received in Emergency Planning from the Scottish and
Southern Electricity Networks (SSEN) Resilient Communities Fund, explained
in the quarter 1 monitoring report. There has been small items of expenditure
to date but the bulk is earmarked for spending on creating power generation
capacity for information and co-ordination hubs. Any unspent funds at year
end will be earmarked for projects agreed with SSEN. Revenue expenditure to
date on Flood Prevention and Bridge Works projects are under budget but this
is understood to be due to profiling of works.  Roads Maintenance is £145,000
over spent to date, with £92,000 coming from an over spend in recharges
from Fleet for additional vehicle hire. Fleet are currently £76,000 under budget
in total but within this are variances that highlight significant price increases
within the service.  Although Fleet recharges to departments recover all
elements of the cost of vehicles and plant, the external costs sit within Fleet
and it is through monitoring of this budget that total variances, both over and
under spends, can be monitored.  Vehicle running costs are £121,000 over
budget at quarter 2, with spare parts accounting for £111,000 of this.  The
costs of spare parts have increased by approximately 30% in recent years. 
External vehicle hires managed by Fleet services are over budget at this point
of the year by £115,000, and as it’s mainly Environmental and Commercial
Services requiring the vehicles; Lands and Parks, Public Transport Unit and
Roads - as referred to above, it’s a recurring overspend that is kept within the
department.  Expenditure of £37,000 has also been incurred for accident
damage this year to date. Cleaning and Catering services is £139,000 under
budget; of this variance school catering has a £110,000 underspend on food
and other costs from which an approved £150,000 saving has still to be taken, 
and is £16,000 favourable on income.  Food costs are no longer as closely
linked to income as they were following the extension of universal Free School
Meals from Nursery to Primary 5.  Uptake may gradually rise as time goes on.  
This is the same trend as last year which had a significant underspent on food
costs although there is expected to be an increase in wheat products as the
situation in Ukraine continues to affect supplies.  Lands and Parks are
£22,000 over budget to date with variances on burial ground income, vehicle
running costs and war memorials.  The Public Transport Unit (PTU) is
currently over budget by £90,000; £54,000 is because of additional school
transport routes required due to pupil numbers and an increase in ASN
provision, and a shortfall of £35,000 in public transport income and this budget
is being reviewed by the service with accountancy. 
4.8 Economic Growth and Development Services have a £46,000 overspend
which is primarily due to a shortfall in income in Building Control and Planning. 
Page 48

Page 49

4.9 In Financial Services, a £54,000 overspend is due to software costs £44,000
and postages within Taxation. 
4.10 Governance, Strategy and Performance is over budget by £44,000 with
notable variances. Benefits is £161,000 over budget to date due to
overspends including software costs, Scottish Welfare Fund, Discretionary
Housing Payments and Housing Benefits.  Customer Services is under budget
by £16,000; contract underspend of £33,000 and an overspend on software
£10,000.  Underspends in other sections include Legal; income is above
target in short term let income by £19,000 and Licensing Board income by
£39,000, and underspends in Supplies and Services £14,000, Electoral grant
of £14,000 unspent to date.  In Poverty, a social inclusion/shared prosperity
fund match funding contribution budget is under budget by £32,000 to date. 
4.11 General Services Housing and Property is over spent by £52,000 in total with
positive and negative variances; Improvement Grants are under by £16,000
due to a higher capital grant than currently budgeted to date; Industrial
Estates have underspends with income exceeding budget to date by £28,000;
Homeless temporary accommodation is currently under budget by £24,000
due to additional income from the revised charges policy approved at
Corporate Committee on 31 January 2023 (para 8 of the minute refers), but
additional costs will follow for furniture and repairs.  Repairs and maintenance
continue to have an overspend; £120,000 overspend for schools which is due
to the pattern of spend on school buildings while corporate buildings repairs
are £44,000 under to date.  There is an income shortfall in Property fees of
£54,000 due to less capital project work being carried out that budgeted for in
the capital plan. 
4.12 In Other expenditure budgets, a variance of £8,000 overspend is due to
additional pension costs/strain on the fund overspend of £77,000 and
Members Wards budgets are £47,000 underspent to date. 
4.13 The MIJB is reporting an overspend across services at the end of quarter 2 of
£1,995,000.  The figures included in this report relate purely to the services
delivered by Moray Council on behalf of the MIJB. 
4.14 Income budgets across the Council are showing both positive and negative
variances.  Sports and leisure facilities budgets should be back to pre Covid
level earlier than planned (paragraph 4.4).  Libraries income has a recurring
variance due to loss of income (paragraph 4.4).  In General Services Housing,
Improvement Grants are under by £16,000 due to a higher capital grant than
currently budgeted for to date, Industrial Estate income is ahead of target by
£28,000 and (as per paragraph 4.11) Homeless temporary accommodation
has additional income of £24,000 to date.  Within Environmental and
Commercial Services there is additional income at this quarter 2 stage in
Waste recycling services (£36,000), Harbours (£123,000), Roads income from
service users (£119,000), Catering income £17,000 and there is an income
shortfall of £25,000 on sale of lairs in Burial Grounds, and £35,000 in the PTU. 
Income is above target in Legal Services for licensing income by £58,000,
Industrial Estates rental of £28,000 and Homeless accommodation of
£24,000.  Other income shortfalls include the Building Control and Planning
fees £65,000. Recharges to capital are also under budget. 
Page 49

Page 50

5. BUDGET PRESSURES AND ADDITIONS 
5.1 Budget pressures recognised when the budget was approved on 1 March
2023 are released when the pressure crystallises to the extent that it can be
accurately quantified.  Provisions to meet budget pressures and new duties
totalling £5,928,000 have been released in quarter 2 and these are itemised in
APPENDIX 4. 
5.2 Provisions still held centrally at the end of quarter 2 total £4,103,000 and are
detailed in APPENDIX 5 and given a RAG assessment for likelihood of
requirement.   
5.3 Six provisions are assessed as red, as no longer being required this year;
although two are currently required in future years; the revised Improvement
and Modernisation Plan (IMP) of £1,302,000 has changed from amber to red
as the amount drawn down in Quarter 2 is all that is required for 2023/24, the
balance of £596,000 will be required for full year effect funding to cover April
to August 2024; the £30,000 Deposit Return Scheme budget pressure was
confirmed in Scottish Parliament in June to be delayed until October 2025.
Other budget pressures now no longer needed are; DSM review class contact
time budget pressure of £18,000; the Economic Recovery Plan (reported to
Economic Development and Infrastructure Services Committee on 2 May
2023) of £53,000; £5,000 for a contribution to Renewables Income Fund; and
£11,000 for the Trade Union provision which was drawn down as part of
funding from reserves and is no longer a budget pressure. These will be
adjusted for in quarter 3 and will be reflected as a reduction in required used
of reserves this year. 
5.4 Fourteen provisions, totalling £3,654,000, are assessed as amber, being not
yet taken and uncertain if required, or yet to be taken. Six have had no draw
down of budget this year to date but latest consultations with departments are
that they are still likely to be required, with only School real time data
uncertain of requirement of the £63,000 budget pressure.  The remaining
eight classed as amber include; free school meals of £293,000 with a balance
of £205,000 available.  A portion of this is required for Christmas and mid term
break in the 2023/24 academic year; School roll numbers £700,000 budget
pressure was waiting for updated census figures which have just been
received and calculations indicate that £406,000 of this is not required as the
roll figures came in below estimates. The Levelling Up Fund balance of
£177,000 may be drawn down as it has the potential to spend in full if the
application is submitted.  Youth Work £120,000 (£60,000 each for Forres and
Buckie areas) will be used in full this year.  The Whole Family Wellbeing Fund
(WFWF) £545,000 is the 2023/24 funding allocation.  Unspent funds from last
year have also been carried forward to be funded from reserves and it is
unlikely that the total of these will be spent in full this year.  Decision on how
the funds are spent are made by the Community Planning Partnership and it
is therefore intended that any unspent funds at year end are put to an
earmarked reserve, therefore shown as amber. 
5.5  All other provisions are expected to be required in full at this juncture.  
Page 50

Page 51

6. EMERGING BUDGET PRESSURES 
6.1 Emerging budget pressures are noted throughout the year as they are
identified. Pressures that were identified during quarter 2 are listed in the table
below. 
Para
Ref
Estimated full year
effect
£000s   
Waste – additional crew for household
collections
6.2 136  
____
Total  136  
==== 
6.2 There are significant developments ongoing within the Waste service, with
moves to 3 weekly collections during covid now a permanent fixture and the
opening of the NESS Energy from Waste (EfW) facility and the transitional
phase of operations. Discussions with the Waste Manager has identified a
separate issue when recognising all the changes; whilst savings have been
made in some aspects of household collections, this has highlighted the need
for an additional crew to service an increased number of properties across
Moray, a budget pressure that was perhaps obscured by the changes
implemented during Covid. Already operational, this has identified a budget
pressure in the service of £136,000. 
7. SAVINGS 
7.1 Savings and increased charges of £4,415,000 were approved when the
budget was set on 1 March 2023. These savings comprised one-off savings of
£775,000 and other permanent savings of £3,490,000. The increase in
charges per the budget paper was £150,000. 
7.2 In addition to the savings approved when the budget was set, additional
savings/income of £1,480,000 were approved at Moray Council on 28 June
2023 (paragraph 13 of the minute refers), including an increase of £400,000
for Council tax receipts. 
7.3 Increases to car parking charges were approved in the Elgin Car Parking
review reported to Council on 27 September 2023. The full year income
budget will increase by £414,000 with a part year effect from 1 January 2024
of £103,000. 
7.4 Temporary Accommodation charges for the homeless have also been
increased, with a part year effect in 2023/24 of £20,000. 
7.5 Customer Services Change Management Plan savings of £108,000 have
been taken. 
Page 51

Page 52

7.6 Savings approved in the Short to Medium Term Financial Plan reported to
Council on 28 June 2023 total £29,000. 
7.7 Energy from Waste saving on a reduced gate fee due to electricity generation
at the waste plant in Aberdeen has been initially valued at £150,000 but
further savings are anticipated. 
7.8 Total savings/increased income posted to date are £2,536,000 plus the
Council Tax increase.  Of the original approved savings, a balance of
£1,879,000 remains in central provisions as at the end of June.  These are
detailed in APPENDIX 6 and given a Red Amber Green (RAG) assessment
for anticipated achievement. 
7.9 Approved savings that are now not expected to go ahead, marked in red on
the APPENDIX 6, total £783,000; financial services restructure of £16,000;
£35,000 for salt store at Keith which is now being progressed as part of a
wider depot review; £2,000 saving for charges for temporary bus stops will not
be achieved as contractors have supplied their own temporary stops; £56,000
for the Stream 2: ICT and Digital - schools admin will not materialise this year
as following the report to Education, Children’s and Leisure Services (ECLS)
Committee on 19 September 2023, which gave an update to committee on
progress of the IMP.  As was confirmed at that meeting, the next stage of the
project will be a Service Review with an update to be presented to the next
ECLS Committee. Estimated savings will not be realised this year (paragraph
20 of the minute refers); the LEAN review has been delayed and savings of
£125,000 yet to be achieved; the £725,000 proposed income from spare
capacity at Dallachy is unlikely to be achieved in full as private sector
companies have sought alternative sites for their waste. This has led to
reduced landfill charges but also less tipping income. There is potential to
meet £200,000 of additional income, however, for tipping by other local
authorities when there were issues with the new EfW facility. 
7.10 Savings classed as amber total £2,531,000. Of these, £2,353,000 are still
expected to be achieved this year; review of purchasing card £30,000, which
will be across services to ensure that VAT receipts are submitted per financial
regulations and therefore all input VAT reclaimed; £136,000 savings from the
move to a 3 weekly recycling collection; Harbours commercial income of
£336,000; £142,000 of increased Transportation and Consultancy recharges
to capital; £1,168,000 of a service concession in Education PPP payments; an
increase of vacancy factor in line with pay agreement of £208,000; Children’s
services care placements £245,000; reduction in reinvestment costs of
£18,000; a share of the surplus from the Grampian Valuation Joint Board
2022/23 requisition of £46,000. . The remaining £198,000 savings are
tentative; £100,000 for hiring out of Roads machinery is currently going
through the process of communicating with suppliers and determining needs
before going out to tender, however supply chain issues are causing delays in
delivery of replacement vehicles; balance of a contract saving £8,000;
Property Services admin review £26,000; Stream 4 review and expansion of
flexible working £44,000; £20,000 NDR saving from the relocation of staff
from Auchernack which is reliant on the sale being completed early in 2024.
Some of these may slip into next financial year.  
Page 52

Page 53

8 ESTIMATED OUT-TURN 
8.1 APPENDIX 2 summarises the first estimated out-turn position for each service
area, comparing the estimated expenditure with the budget to 31 March 2023. 
8.2 Overall the estimated out-turn position for 2023/24 is expenditure over budget
of £436,000 or 0.2% of budget for the year, including services delivered on
behalf of the MIJB. 
8.3 The estimated out-turn position for 2023/24 for the MIJB is an overspend of
£10,600,000. The MIJB have strategic funds and an element of reserves to
offset part of the overspend, and the partner providers (NHS and Council) are
required to cover the balance. Health and Social Care services provided by
the Council make up 37% of the MIJB and so the Council’s share of this
projected overspend is £1,540,000.  Some of the reserves are ear-marked for
spend in 2024/25 and will require to be replenished.  It is currently estimated
that with no further changes in the cost of services the opening position for
MIJB will be an overspend and the Council’s share of that overspend would
be £5 million. 
8.4 The principal areas of forecast overspends and underspends across the
Council reflect the major variances mentioned in section 4 of this report.
Details of projected out-turn variances are summarised below. 
8.5 Staff savings from vacancies and appointments below top of scale across all
services are anticipated to exceed the overall budget provision by £238,000.
This excludes the current saving still to be posted against staffing budgets to
increase the vacancy factor, which will be done when pay agreements have
been settled. Income budgets across the Council are showing both positive
and negative variances, with a projected net effect of £587,000 under
achievement. This includes increased leisure income and street naming and
numbering income, additional income in short term lets and licensing fees,
and recycling income. There is a shortfall in income for Libraries, Roads
construction consent, public transport income, green waste and trade waste.
Catering income, sale of lairs in Burial Grounds, planning and building control
fees and Property fees income are all expected to be below target. 
8.6 In Children’s Services there is a projected underspend totalling £723,000,
made up of £104,000 from the review of two contracts going out to tender, the
disabilities residential contract £300,000 (in addition to the planned £245,000
saving to be taken in quarter 3), fostering fees and allowances underspend
£143,000, throughcare/after care grants £29,000, adoption allowances and
post-adoption support £42,000, one off income from adoption placement
£36,000, vacancy target exceeded by £146,000 and other contract
underspends of £21,000. This is reduced by overspends in direct payments of
£82,000, home to school transport £23,000 and adoption placements with
other local authorities £23,000 and other overspends regarding Section 22 of
£16,000.  
Page 53

Page 54

8.7 In Education there is a projected underspend of £199,000. Underspends
include spend on school sanitary products £25,000, clothing grants £10,000,
disturbance mileage £11,000, and a review of the Speech and Language
Therapy service generating a projected £65,000 underspend. Staffing
vacancies also generating an overachievement of vacancy target by
£146,000. Overspends on Early Learning and Childcare payments to partner
providers of £100,000 are expected to be brought back into line next year
once all change management plans are implemented. Insurance excess
payments are projected to be £58,000, and central supply £225,000 above
budget by year end. 
8.8 As mentioned earlier in this report (paragraph 4.11) there is an overspend in
repairs and maintenance at school buildings and an income shortfall in
Property fees recharges. The latter is due to reduced capital projects that are
rechargeable for the service. The full year effect is an overspend on General
Services Housing of £470,000; school repairs and maintenance £200,000,
Property fees shortfall £150,000 and staff vacancy target shortfall. 
8.9 Environmental and Commercial Services currently projecting an over spend of
£447,000 (1.6%) for the year. Shortfall in achieving vacancy targets of
£104,000 is one factor, which is partly due to sub contractors being used to
cover vacancies which is vastly more expensive, along with overspends in
Fleet Services of £120,000 primarily around transport costs including spare
parts, external vehicle hire for user departments (not staff car hire),
trackers/radio contracts and accident damage. Traffic and Transportation
projecting a £270,000 overspend: shortfall in Roads Construction Consent
income £60,000, shortfall of £110,000 public transport income (per
paragraphs 4.7 and 7.5), and £100,000 additional costs for school transport
contracts due to additional transport requirements for Forres Academy pupils
whilst RAAC remedial works are ongoing, and an increase in service routes
for mainstream and ASN pupils. Waste Management has various over and
under budget projections totalling a net £30,000 overspend; underspends on
recycling income £50,000, advertising £20,000, energy costs £15,000 and fuel
£30,000 against under achievements on green waste income from brown bin
permits of £50,000, trade waste income £90,000 and street sweeping income
£5,000. Over the next quarter the EfW costs and income will be assessed and
a new budget position developed. The estimated outturn figures in Appendix 2
include a net underspend of £38,000 for Building Cleaning and Catering;  this
is not inclusive of the £150,000 saving yet to be taken for food costs (per
paragraph 4.7). Parks and Countryside has a projected overspend of
£161,000 due to income budget unachieved in Burial Grounds sale of lairs
£60,000 and Open Spaces costs for additional vehicle hires and fuel £92,000,
and War Memorials £6,000. Finally, the SSEN grant of £200,000 in
Consultancy is creating a variance. 
8.10 HR, ICT and Organisational Development have a projected underspend of
£95,000; training £50,000 and staff vacancy target surplus £45,000. 
8.11 Financial Services has a net underspend of £211,000 projected; a staff
vacancy target surplus of £45,000 and Interest on Revenue Balances (IORB)
exceed budget by £236,000, but within this are overspends in postages of
£45,000 and software costs £35,000. 
Page 54

Page 55

8.12 Governance, Strategy and Performance have a net £208,000 underspend
projected. Overspends on housing benefits of £100,000 and software costs
(Benefits team £32,000 and the Contact Centre £10,000). Underspends
include the multi function device contract payments £33,000, additional
income from Licensing and Short Term Lets £58,000 plus other supplies and
services budgets £10,000. A match funding contribution budget in Poverty
social inclusion/shared prosperity fund (paragraph 4.10) is no longer required
of around £64,000. 
8.13 There are other overspends for additional pension and Strain on the Fund
costs totalling £83,000. 
8.14 Loans Charges - £2,000,000 of a budget pressure was approved as part of
budget setting and has been added to the budget in full. Loans Charges are
currently forecasting an underspend against budget of £885,000; the budget
calculations were based on projected spend during 2022/23 quarter 3 but
spend finished at £6 million less than anticipated. Another factor is interest
rates, which were assumed to be 4% in the budget calculations, but the recent
workings are estimated slightly lower, at approximately 3.35%. Due to the
portfolio of loans the Council has, which includes older loans with lower
interest rates, the calculations for average loans charges results in lower
costs overall. For comparison, the 2022/23 loans pool actual rate was 3.54%. 
8.15 Centrally held provisions are expected to underspend by £786,000. Additional
Costs including the remaining budget pressure requirements as discussed in
section 5 are estimated to be £1,768,000 under at this stage of the year;
primarily consisting of the budget pressures classed as red (paragraph 5.3):
slippage in the IMP £596,0000 and Deposit Return Scheme £30,000. The
others totalling £87,000 are no longer required. Slippage in the amber
category includes the Whole Family Wellbeing Fund (WFWF) £545,000 which
will go to an earmarked reserve at year end. An estimated £406,000 of the
school roll budget pressure is no longer required. Savings outstanding were
discussed in section 7 and the amber savings expected to be achieved this
year have been included in the estimated outturn figure in APPENDIX 2. The
original budget approved included £4,415,000 of savings and increased
charges, and to date £2,536,000 has been posted to department budgets with
a further £2,995,000 expected to be posted in quarter 3. If these are realised
there will be an overachievement of savings of £1,116,000 in the year,
however £300,000 of this was bringing forward the reinstatement of the
leisure income budget to pre-covid levels from next year. Provision for
Contingencies and Inflation are complex to estimate as the pay agreement is
still under negotiation which is the largest remaining draw down of inflation.
The estimated position for inflation is an overspend as other inflationary
increases are still expected this year, including corporate insurance. 
9 RESERVES 
9.1 The balance on free general reserves (excluding DSM and ear-marked
reserves) as at 1 April 2023 was £5,000,000.  This is the minimum level of
reserves that can be held on free general reserves in terms of the Council’s
reserves policy. 
Page 55

Page 56

9.2 When the budget was set, an allocation of £15,478,000 of Covid ear-marked
reserves were approved.  The report to Moray Council on 28 June 2023 for
the Revenue out-turn variances approved an additional use of covid ear-
marked reserves totalling £2,158,000 (paragraph 13 of the minute refers). The
variance analysis adjustments also reflected a reduction in the use of
reserves of £1,589,000 due to additional savings and income.  Temporary and
permanent budget pressures in Additional Support Needs (ASN) were
reported to that same meeting and £1,800,000 was approved to be funded
from this reserve.  Further adjustments have also been approved in quarter 2
and taken into account on the appendix; additional funding for the SNCT pay
agreement 2022-24 has recently been confirmed of £2,204,000 and the pay
award funding £2,007,000 that is received via capital grant for two years
2022/23 and 2023/24 has now been reflected in the figures as these will
reduce the budgeted requirement for use of reserves.  APPENDIX 7 itemises
the movements on reserves during the year to date and gives the balance on
the reserve of £9,160,000 at 30 September 2023 after all approved items. 
The quarter 2 position is that £15,548,000 of covid reserves are required in
2023/24 compared to an original budgeted amount of £15,478,000. 
9.3 Balances at 30 September 2023 for other ear-marked reserves are
£3,791,000 for Transformation and £5,881,000 for Council priorities. There is
also a reserve for the Moray Growth Deal with a free balance of £4,000,000
as at 30 September 2023; the £759,000 approved at budget setting is not
required this year due to slippage in projects. 
10 SUMMARY OF IMPLICATIONS 
(a) Moray 2026: A Plan for the Future and Moray Corporate Plan
Effective budget management is an essential component of delivery of
Council priorities on a sustainable basis. 
(b) Policy and Legal
No policy or legal implications arise directly from the contents of this
report. 
(c) Financial implications
The financial implications are addressed throughout the report. 
(d) Risk Implications
There are no risk implications arising directly from this report. Budget
managers are aware of their responsibilities for managing their budgets
in accordance with the Council’s Financial Regulations. There is a risk
to the Council arising from the agreement that if the Moray Integrated
Joint Board overspends the Council will meet 37% of the additional
costs incurred. Rising inflation presents a risk to the Council’s budget. 
(e) Staffing Implications
No staffing implications arise directly from this report. 
(f) Property
No property implications arise directly from this report. 
Page 56

Page 57

(g) Equalities/Socio Economic Impact
No equalities implications arise directly from this report. 
(h) Climate Change and Biodiversity Impacts
No climate change and biodiversity impacts arise directly from this
report. 
(i) Consultations
Consultation concerning Revenue Budget Monitoring is an on-going
process with budget managers across the Council. CMT and Heads of
Service have also been consulted in the preparation of this report and
any comments incorporated. 
11 CONCLUSION 
11.1 The financial position of the Council at the end of September 2023 is an
overspend against General Services Revenue Budget of £332,000,
including services delivered on behalf of the Moray Integration Joint
Board. 
11.2 Variations in General Revenue Grant totalling £2,867,000 have been
notified to the Council. 
11.3 There is one additional budget pressure totalling £136,000 for quarter 2,
noted in section 6. 
11.4 The estimated out-turn position is for an over spend of £436,000. 
11.5 The Council has estimated use of £14,953,000 from Covid ear-marked
reserves in 2023/24. 
Author of Report:  Susan Souter, Senior Accountant
Background Papers:  Held by author
Ref:    SPMAN-1293228629-979 
Page 57

Page 58

Page 58

Page 59

APPENDIX 1
MORAY COUNCIL - APPENDIX 1
BUDGET MONITORING REPORT
QUARTER 2 to 30 SEPTEMBER 2023
Service
Revised Budget
2023/24
£000s
Budget to 30 Sept
2023
£000s
Actual &
Committed to
30 Sept 2023
£000s
Year to date
variance
£000s
Education, Resources & Community 14,349 7,233 7,128 105
Childrens Services 20,086 9,907 9,448 459
Education 98,880 45,917 45,214 703
General Services Housing & Property 4,417 2,613 2,665 (52)
Environmental & Commercial Services 28,782 12,477 11,972 505
Economic Growth & Development Services 4,085 2,340 2,386 (46)
HR, ICT & Organisational Development 6,188 3,837 3,743 94
Financial Services 1,832 1,285 1,339 (54)
Governance, Strategy & Perfomance 6,420 4,112 4,156 (44)
Other Services 2,706 1,455 1,463 (8)
SERVICES excl HEALTH & SOCIAL CARE 187,745 91,176 89,514 1,662
Health & Social Care (IJB) 60,404 26,326 28,321 (1,995)
Health & Social Care (Non IJB) 99 49 48 1
TOTAL SERVICES incl HEALTH & SOCIAL CARE 248,248 117,551 117,883 (332)
Loans Charges 16,407 0 0 0
Provision for Contingencies and Inflation 1,902 0 0 0
Additional Costs 4,103 0 0 0
Unallocated Savings (1,879) 0 0 0
TOTAL PROVISIONS 4,126 0 0 0
TOTAL GENERAL SERVICES EXPENDITURE 268,781 117,551 117,883 (332)
Commentary on Quarter 2 Performance
Childrens Services: Underspend on a contract for residential care for children with disabilities, out of area
placements, and adoption/fostering fees. Within Area Teams, direct payments are over budget while fostering
home to school transport are under budget.
Education: Devolved School budgets are underspent by £613k at the end of the second quarter; £130k in Primary
schools and £483k in Secondary schools.
Environmental & Commercial Services: Underspends across services including: Waste (£180k) with the opening
of the new Energy from Waste plant in Aberdeen; Catering underspend (£139k) on food costs and materials;
Harbours net underspend (£144k) from over achievement of income target; Consultancy £200k SSEN grant
for resilience development projects unspent to date.
Overspends in Roads £146k, PTU £90k - school transport additional routes, and shortfall in Bus Revolution income.
6.2%
8.4%
39.1%
2.2%
10.6%2.0%
3.3%
1.1%
3.5% 1.2%
22.4%
0.0%
Budget YTD
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB) Health & Social Care (Non IJB)
6.0%
8.0%
38.4%
2.3%
10.2%
2.0%3.2%
1.1%
3.5%
1.2%
24.0%Actual YTD
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB)
(2,500)
(2,000)
(1,500)
(1,000)
(500)
0
500
1,000
£000's
YTD Actual Variance to Budget (excl Loans & Provisions)
Education, Resources & Community Childrens Services
Education General Services Housing & Property
Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services
Governance, Strategy & Perfomance Other Services
Health & Social Care (IJB)
Item 9.
Page 59

Page 60

Page 60

Page 61

APPENDIX  2
MORAY COUNCIL - APPENDIX 2
BUDGET MONITORING REPORT
QUARTER 2 to 30 SEPTEMBER 2023
Service
Revised Budget
2023/24
£000s
Estimated
Outturn 2023
£000s
Anticpated
Variance £000s
Variance vs Base
Budget
%
Education, Resources & Community 14,349 14,417 (68) (0.5)%
Childrens Services 20,086 19,363 723 3.6%
Education 98,880 98,681 199 0.2%
General Services Housing & Property 4,417 4,887 (470) (10.6)%
Environmental & Commercial Services 28,782 29,229 (447) (1.6)%
Economic Growth & Development Services 4,085 4,161 (76) (1.9)%
HR, ICT & Organisational Development 6,188 6,093 95 1.5%
Financial Services 1,832 1,621 211 11.5%
Governance, Strategy & Perfomance 6,420 6,212 208 3.2%
Other Services 2,706 2,779 (73) (2.7)%
SERVICES excl HEALTH & SOCIAL CARE 187,745 187,443 302 0.2%
Health & Social Care (IJB) 60,404 65,173 (4,769) (7.9)%
Health & Social Care (Non IJB) 99 96 3 3.0%
Adjustment to reflect cost sharing agreement 0 0 3,229 -
TOTAL SERVICES incl HEALTH & SOCIAL CARE 248,248 252,712 (1,235) (0.5)%
Loans Charges 16,407 15,522 885 5.4%
Provision for Contingencies and Inflation 1,902 4,000 (2,098) (110.3)%
Additional Costs 4,103 2,335 1,768 43.1%
Unallocated Savings (1,879) (2,995) 1,116 (59.4)%
TOTAL PROVISIONS 4,126 3,340 786 19%
TOTAL GENERAL SERVICES EXPENDITURE 268,781 271,574 436 0.2%
Funded By:
Scottish Government Grant 198,331 198,331 0 0.0%
Pay Award Funding via Capital Grant 0 2007 (2,007) 0.0%
Council Tax 49,974 49,974 0 0.0%
Funded From Reserves:
DSM 1,646 1,646 0 0.0%
DSM c/f 1,689 796 893 52.9%
General/earmarked 638 638 0 0.0%
Covid 15,744 14,953 791 5.0%
MGD Cash Flow 759 0 759 100.0%
MIJB Cost Adjustment 0 3229 0 0.0%
TOTAL FUNDING 268,781 271,574 436 0.2%
OVERALL VARIANCE 0 0 0
Commentary on Quarter 2 Performance
Childrens Services: projected underspend from review of contracts going out to tender, the disabilities residential
contract (in addition to the planned saving to be taken in quarter 3), fostering fees and allowances underspend 
and adoption allowances and post-adoption support
General Services Housing & Property: overspends estimated on school repairs and maintenance combined with a
property fees recharge shortfall.
Environmental & Commercial Services: Shortfall in achieving vacancy taregts partly due to sub contractors being
utilised, Fleet overspends on vehicles and plant for Council departments. School transport contracts overspend. 
School trransport contracts overspend (Forres Academy relocation of pupils, additional routes for ASN pupils).
5.3%
7.5%
36.8%
1.6%
10.7%
1.5%
2.3%
0.7%
2.4%
1.0% 22.5%Budget 2023/24
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB)
5.4%
7.2%
36.8%
1.8%
10.9%
1.6%
2.3%
0.6% 2.3%
1.0%
24.3%
0.0%Est Outturn
% of Total
Education, Resources & Community Childrens Services Education
General Services Housing & Property Environmental & Commercial Services Economic Growth & Development Services
HR, ICT & Organisational Development Financial Services Governance, Strategy & Perfomance
Other Services Health & Social Care (IJB) Cost sharing agreement
Health & Social Care (Non IJB)
(2,000)
(1,500)
(1,000)
(500)
0
500
1,000
£000's
Est Outturn Variance to Budget (excl Loans & Provisions)
Education, Resources &
Community
Childrens Services
Education
General Services Housing &
Property
Environmental & Commercial
Services
Economic Growth &
Development Services
HR, ICT & Organisational
Development
Governance, Strategy &
Perfomance
Other Services
Health & Social Care (IJB)
Health & Social Care (Non
IJB)
Item 9.
Page 61

Page 62

Page 62

Page 63

APPENDIX 3
Allocated
Budget
Provisions for
Contingencies
and Inflation
Additional
costs
Savings Budget Loan
Charges
Depreciation Total
Budget
£000s £000s £000s £000s £000s £000s £000s £000s
1 March 2023 231,397 4,182 15,269 (4,415) 246,433 14,407 260,840
School carry forwards 853 853 853
PEF carry forwards 757 757 757
ELC carry forwards 36 36 36
Funded from reserves - approved MC 28/06/23 2,158 2,158 2,158
Funded from Transformation Earmarked Reserve 76 76 76
Funded from Covid Earmarked Reserves 128 128 128
Adjustment 1 6,850 (5,908) (3,013) 2,071 0 0
Adjustment 2 - move inflation pot - 5,098 (5,098) 0 0
Corporate Committee 29/8/23 242,255 3,372 7,158 (2,344) 250,441 14,407 0 264,848
Adjustment 3 0
Funded from Covid Earmarked Reserves 421 421 421
Funded from Other Earmarked Reserves 639 639 639
Additional GRG 0 2,873 2,873 2,873
Adjustment 4 4,933 (1,470) (5,928) 465 (2,000) 2,000 0
Moray Council 6/12/23 248,248 1,902 4,103 (1,879) 252,374 16,407 0 268,781
Item 9.
Page 63

Page 64

Page 64

Page 65

APPENDIX 4
ALLOCATIONS FROM PROVISIONS SINCE 30 JUNE 2023
Provision for Contingencies and Inflation Committee
reference
£000s £000s
Balance at 30 June 2023 3,372
Grampian Valuation Joint Board Requisition uplift (51)
Education DSM adjustment (16)
Contract indexation - electricity (1,361)
Contract indexation - other (4)
Other - Contingency (38)
(1,470)
Balance at 30 September 2023 1,902
Additional Costs £000s £000s
Balance at 30 June 2023 7,158
Movements in General Revenue Grant
Summer Holiday Activities funding 68
Employability Staffing 264
H&SC funding to MIJB 2,210
Ukrainian Resettlement 331
2,873
Budget pressures approved when budget set
DSM Formula adjustment - Primary (30)
ELC Specific Grant (190)
Schools - Education Investment Fund (196)
Free School Meal Expansion - summer holidays (99)
School Transport ASN costs CORP 13/06/23 (66)
NDR Revaluations (363)
Increase in Loans Charges (2,000)
Road Safety matters (50)
H&SC funding to IJB - Real Living Wage Allocation (1,882)
H&SC funding to IJB - Personal and Nursing Care (328)
(5,204)
Additional Budget Pressures approved
Raising Attainment (214)
Additional ASN costs - ARG Budgets CORP 13/06/23 (70)
(284)
Service Developments
Levelling Up Fund (44)
Youth Work (Buckie & Forres) (64)
(108)
Additional funding allocated
Summer Holiday activities funding (68)
Employability Staffing Costs 23-24 (264)
(332)
Balance at 30 September 2023 4,103
Item 9.
Page 65

Page 66

APPENDIX 4 Savings & Charges £000s £000s
Balance at 30 June 2023 (2,344)
Permanent savings approved when budget set:
Savings identified after budget set:
Customer Services CMP Corp 25/4/23 108
Expenses Savings MC 28/6/23 29
Energy from Waste reduced gate fee (Electricity) MC 28/6/23 150
Homelessness service charges (part year) Hsg & Comm Safety
12/9/23
20
Education CPD saving taken earlier than planned 5
Scottish Water commission 50
Elgin Car Parking Review MC 27/9/23 103
465
Balance at 30 September 2023 (1,879)
Page 66

Page 67

BUDGET PRESSURES APPENDIX 5
Description Para Ref Approved
Amount
Drawn
Down
Balance Status Qtr 2 reason for balance
RECOGNISED WHEN BUDGET SET £000 £000 £000
Social Work
Education Resources & Communities
School Transport - Additional ASN Costs 66 66 0
Free schools meals expansion April - August 5.4 293 88 205 £76k required forholiday
provision Xmas & Feb mid term
Free School Meals holiday provision 80 80 0
DSM / class contact time review 5.3 18 0 18 Employee finished position
early.
Libraries loss of income from Passport checking service no longer available 26 26 0
Education
Additional Teachers  5.4 285 244 41 Balance to be drawn in Qtr 3
School roll numbers 5.4 700 43 657 Census figures have just been
finalised. Roll figures came in
under estimates. Estimated
£406k not required.
ELC specific grant 190 190
5% increase in sustainable rate ELC partner providers 395 395
* Education Investment Fund - short term funding 5.4 500 197 303 Balance to be taken will depend
on allocations for new children
into Moray.
Additional Support Needs (ASN)
5.4 0 70 (70) Further funding required will
depend on packages agreed to
support existing children.
Economic Growth & Development
MGD revenue contribution STEM 3 3 0
Bus Revolution revenue 20 20 0
Development Plan Scheme - transportation appraisals 5.4 100 0 100 Will be required in full.  Will
draw down for Q3
Economic Recovery Plan 5.3 53 0 53 No longer required
Renewables Income Fund 5.3 5 0 5 No longer required
Environmental & Commercial
Leachate - ongoing budget pressure 77 77 0
Mid Term Loadline Survey - Dredger 30 30 0
Fuel Costs - Waste 127 127 0
Item 9.
Page 67

Page 68

Brown bin permits 34 34 0
Deposit Return Scheme 5.3 30 0 30 Postponed one year to 24/25
* Road Safety matters 50 50 0
Governance etc
Reduced admin funding from DWP for Housing Benefits 7 7 0
* Amount for each Ward (£15k) to address minor works/concerns 120 120 0
Housing & Property Services
Homeless - higher costs of providing and maintaining temporary
accommodation for increased levels of homeless presentations
220 220 0
Financial Services
Procurement (additional 0.5FTE Procurement Officer) 28 29 (1)
Other
* Donation to assist local effort for relief of suffering in Turkey/Syria 5.4 5 0 5 Budget to be drawn down
* Donation to Moray Foodbank (in addition to 22/23 donation) 20 20 0
Cross Service
Reinstatement of the Employee Assistance Programme 15 15 0
NDR revaluation 5.4 400 363 37 Not all NDR accounts settled
yet - potential for some of the
balance still required.
TU Provision 5.3 11 0 11 Drawn down as part of the
funding from reserves (MC
24/5/23)
Increase in Loans Charges 2,000 2,000 0
Removal of Statutory Mitigation for Flexi/TOIL 0 173 (173) Annual Accounts entry
Funding for MIJB
H&SC £100M RLW funding 1,882 1,882 0
H&SC PNC funding 328 328 0
Total 8,118 6,897 1,221
Funded from Transformation Earmarked Reserves
Revised IMP
Raising Attainment - TCH
5.3 1,302 706 596 Funding for positions drawn
down - funding will be required
for April to August next financial
year.
Raising Attainment - SJC 0 90 (90) as above
Total 1,302 796 506
Page 68

Page 69

FUNDING FOR NEW DUTIES
FSM Expansion 5.4 1,204 0 1,204
Whole Family Wellbeing Fund (WFWF) 5.4 545 0 545 Unspent will be put to an
earmarked reserve at y/e along
with last years £546k.
Empty Property Relief 508 508 0
Summer Holiday activities funding 68 68 0
Employability Staffing Costs 23-24 264 264 0
Ukrainian Resettlement 5.4 331 0 331 Notified in September of
allocation. Draw down in Qtr 3
SERVICE DEVELOPMENTS
Levelling Up Fund 5.4 221 44 177 Potential to spend in full if
Levelling up Round 3
application is to be submitted
School real time data 5.4 63 0 63 Checking with service if any of
this will be used this year
Youth work (Buckie and Forres) 5.4 120 64 56 Will be fully used this year -
Buckie projects just being
finalised
Roads patching - one year only 300 300 0
Total 3,624 1,248 2,376
Grand Total 13,044 8,941 4,103
* One year funding
Page 69

Page 70

Page 70

Page 71

SAVINGS APPENDIX 6
Description Para ref Approved
Amount
Achieved Balance Status Committee
reference
Qtr 2
Reason for balance Savings likely to
be achieved? (Y
or N)
£000 £000 £000
Approved when 2023/24 budget set:
Financial Services
Financial service restructuring 7.9 (16) 0 (16) N
Review of purchasing card 7.10 (30) 0 (30) Cross service saving Y
Empty Property Relief (44) (44) 0
Environmental & Commercial Services
Salt store (Keith depot) 7.9 (35) 0 (35) Was approved but new
mandate being prepared
for larger scale project
N
Roads maintenance - hire out machinery 7.10 (100) 0 (100) Supply chain issues N
3 weekly recycling collection 7.10 (136) 0 (136) Savings achieved and
budget to be taken.
Temp Bus Stop Charges 7.9 (2) 0 (2) Contractors will not pay
charge. Saving to be
removed.
Harbours commercial income 7.10 (336) 0 (336) Confirmation on
Windfarm income
streams has now been
provided and saving will
be posted in Qtr 3
Y
TRO charges (16) (16) 0
Transportation and Consultancy recharges 7.10 (142) 0 (142) Transportation can take
25% of the saving and
Consultancy 75% 
Y
Economic Growth and Development
Statutory fees for planning applications (110) (110) 0
Local Housing Energy Efficiency Strategy (LHEES) (50) (50) 0
Housing & Property Services
Closure of Quarryhill (28) (28) 0
Cessation contract SACRO 7.10 (150) (142) (8) Net saving lower than
estimated (mainly due to
22/23 pay award).
Maximum saving already
taken - no further saving
to come.
N
Item 9.
Page 71

Page 72

Property Services admin 7.10 (26) 0 (26) Awaiting confirmation
from Dept
Homelessness service charges (230) (230) 0
Integrated Children's Services
Children's Services - adoption, temp HoS (54) (54) 0
Schools
Service concession 7.10 (1,168) 0 (1,168) Based on Arlingclose
Treasury Advisers
calculations, saving to be
taken in Qtr 3
Y
Education Resources and Communities
Relocate staff from Auchernack plus Forres
Community Centre staff restructure
7.10 (20) 0 (20) Mostly relates to NDR
and so is dependent on
sale of asset. Currently
under offer, hopeful that
sale will complete early
2024.
Y
ASN contracts: Home Tuition, Call Scotland, SALT (60) (60) 0
Area Forums (4) (4) 0
Corporate/Cross service
Charges review - See Charges Tab 0
EV / ULE salary sacrifice 7.9 (20) 0 (20) Ultra Low emission vehicles
scheme - savings unlikely to
be achieved in 2023/24,
push back to next year
Increase vacancy factor in line with pay awards 7.10 (225) (17) (208) Dependent on pay
agreement
Improvement & Modernisation Programme:
Stream 2: ICT & Digital - Schools Admin 7.9 (56) 0 (56) Reported to ECLS 19/9/23 -
further information
requested and to report
back to ECLE on 28 Nov
2023  there will be no
saving in 23/24.
Stream 4: Review & Expansion of Flexible Working 7.10 (44) 0 (44)
Care placements 7.10 (245) 0 (245) Saving to be taken in Qtr 3
Reduction in reinvestment costs 7.10 (18) 0 (18) Saving to be taken in Qtr 3
LEAN review 7.9 (125) 0 (125) Work has started on pilot
porjects but unlikely to
achieve savings in 23/24.
Customer Services CMP 7.5 0 (108) Corp 25/4/23
Page 72

Page 73

Temporary Savings
Corporate
Grampian Valuation Joint Board - Refund 7.10 (50) 0 (50)
MC 8/3/23
Surplus £46k approved at
GVJB Board 3/11/23,
slightly less than proposed.
To be posted Qtr 3
Y
Direct Services
Dallachy spare capacity - income 7.9 (725) 0 (725) MC 8/3/23 This was based on the
potential to sell available
space in the final cell at
Dallachy to private sector
operators, who have sought
alternative sites.  Dallachy is
still open and charges are
being levied at £29 per
tonne so potential to
achieve up to £200k
N
Income (150) (181) 31 MC 8/3/23 Income has exceeded budget
Income approved since budget set
Elgin Car Parking Review (wef 1/1/24) 7.3 (103) (103) 0 MC 27/9/23
Savings approved since budget set:
IORB 7.2 (715) (715) 0 MC 28/6/23
Development Services - Software Licences 7.2 (11) (11) 0 MC 28/6/23
Members Allowances/Expenses 7.2 (20) (20) 0 MC 28/6/23
HR - Professional fees 7.2 (10) (10) 0 MC 28/6/23
Increase in recharges to CapitalHRA 7.2 (105) (105) 0 MC 28/6/23
Income 7.2 (219) (219) 0 MC 28/6/23
Janitorial Restructure (2) (2) 0
Homelessness Temp Accommodation charges 7.4 (20) (20) 0 Hsg & Comm Safety 12/9/23
Savings on expenses - template F6-8 7.6 (29) (29) 0 MC 28/6/23
EfW reduced gate fee (Electricity generation) 7.7 (150) (150) 0 MC 28/6/23
CPD Manager per savings template - taken early (5) (5) 0
Scottish Water commission uplift 23/24 (50) (50) 0
Temporary Savings
LHEES saving (53) (53) 0 MC 8/3/23
Total Approved when budget set (4,415) (936) (3,479)
Total Approved since budget set (1,600) 1,600
Balance at Qtr 2 (1,879)
Page 73

Page 74

Page 74

Page 75

APPENDIX 7
General Reserves Committee
reference
Approved
£000s
Budget
released
£000s
General Reserves @ 1 April 2023 5,000
Free balance @ 30 Sept 2023 5,000
Transformation Ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 5,480
Funding from reserves approved in 2023/24:
Poverty MC 15/09/21 (66)
Raising Attainment MC 15/09/21 (1,547) (796)
Smarter Working MC 02/02/23 (76) (76)
(1,689) (872)
Free balance @ 30 Sept 2023 3,791
Covid Ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 22,897
Less commitments against reserves when
budget was set:
To balance budget MC 01/03/23 (14,505)
Budget pressures re economic recovery (263)
Donation to assist local effort for relief of suffering in Turkey/Syria (5)
Donation to Moray Foodbank (in addition to 22/23 donation) (20)
Amount for each Ward (£15k) to address minor works/concerns (120)
Road Safety matters (50)
Education Investment Fund - short term funding (500)
Reinstatement of the Employee Assistance Programme (15)
(15,478)
Adjustments Qtr 1:
Increase use of reserve:
GRG adj to bring into line with f/c 3/2023 (162)
Funding from Reserves per Variance Report MC 28/06/23 (2,158)
Trades Union Facility Time MC 25/04/23 (23)
0.4fte Trade Union Education MC 24/05/23 (34)
DAR Assistant Registrar / Clerical Assts Burial G 01/23 (72)
ASN Budget Pressure (1,800)
Item 9.
Page 75

Page 76

Decrease use of reserve:
Remove Budget pressures re economic recovery 263
Reduced use of reserves from addl
savings/income (SMTFP Report)
MC 28/06/23 1,589
(2,397)
Adjustments Qtr 2:
Increase use of reserve:
Cost of living 22/23 cont to Moray Food plus (16)
Amend DSM for Speyside HS and Newmill PS Corp 13/6/23 (33)
Bus Revolution revenue costs (74)
Other (99)
Decrease use of reserve:
Remove Budget pressure for renewable income fund 5
Temp accom increased charges part year 20
Education saving taken early 5
Elgin Car Parking review part yr (Jan 24) 103
SNCT pay agreement addl funding 2,204
2,131
Approved use of reserves (15,744)
Other Adjustments
Decrease use of reserve:
Capital element of pay award 22-24 2,007
Free balance @ 30 Sept 2023 9,160
Council Priorities ear marked Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 5,881
Free balance @ 30 Sept 2023 5,881
Moray Growth Deal CF Reserve Committee
reference
Approved
£000s
Budget
released
£000s
Balance @ 1 April 2023 4,000
Less commitments against reserves when
budget was set:
MGD Cash Flow MC 01/03/23 -
Free balance @ 30 Sept 2023 4,000
Page 76

Page 77

REPORT TO: MORAY COUNCIL ON 6 DECEMBER 2023 
SUBJECT: CAPITAL PLAN 2023/24 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT and
FINANCE) 
1. REASON FOR REPORT 
1.1 To advise the Committee of expenditure to 30 September 2023 under the
capital plan for financial year 2023/24 and of estimates of projected
expenditure profiled into quarters. 
1.2 This report is submitted to Committee in terms of Section III (B) 9 of the
Council’s Administrative Scheme relating to monitoring progress of projects in
the approved capital plan including any revisions to the price or phasing on a
quarterly basis. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) considers and notes expenditure to 30 September 2023 of
£8,120,000; 
(ii) considers and notes the current plan, prior to amendment of
£63,531,000 for 2023/24 based on approved expenditure adjusted
for known differences in planned expenditure which have been
identified to date, profiled into quarters, as set out in APPENDIX 1; 
(iii) considers and notes the projected overall expenditure for projects
spanning more than one financial year, as set out in APPENDIX 2; 
iv) considers and notes the amended projected expenditure in the 
year as detailed in section 7.1; and 
(iv) approves amendments to the 2023/24 and 2024/25 capital plan as
detailed in section 6.1 of this report. 
3. BACKGROUND 
3.1 The capital plan for 2023/24 totalling £59,186,000 was approved by Moray
Council on 1 March 2023 (paragraph 4 of the Minute refers).  Amendments
Item 10.
Page 77

Page 78

approved by the Council at its meeting on 8 March 2023 (paragraph 7 of the
Minute refers), and 28 June 2023 (paragraph 8 of the minute refers), and at
Corporate Committee on 28 August 2023 (paragraph 7 of the minute refers)
have been incorporated to give a current approved capital plan for 2023/24
totalling £69,400,000.  The amendments recommended in this report would
result in a capital plan of £65,379,000, but this should not be considered an
estimate of actual spend for the year.  The figure includes expenditure on five
Moray Growth Deal (MGD) projects as estimated in Outline Business Cases
(OBC) – these projects have submitted Full Business Cases (FBC) to the
Scottish Government for approval and the OBC estimates appear unlikely to
be achievable in this financial year.  The MGD Programme is being reprofiled
to reflect draft FBCs and following that the Capital Plan will be adjusted
accordingly.   Although budget managers have expressed confidence that a
high proportion of the projects will spend to current budget there has been a
very low spend to date (11.70%).  Continued volatile conditions in the
construction industry and in supply chains of materials are causing contractors
to decline to tender for works or tender for prices significantly above
estimates, resulting in reduced scope of works being retendered.   
3.2 As some sizeable projects span more than one financial year, this report
includes a separate APPENDIX 2, giving details of expenditure on such
projects in order to give a complete financial overview of these major projects. 
3.3 The indicative 10 year capital plan is being reviewed as part of the financial
planning process to reflect the impact of continued construction inflation and
further increased interest rates on the affordability of the plan.  As a short term
savings measure, capital budget managers have also been asked to review
planned expenditure for 2023/24 with a view to delaying projects or otherwise
reducing expenditure in 2023/24. 
4. CAPITAL PLAN 2022/23 
4.1 A copy of the summary capital plan is included as APPENDIX 1 showing
actual expenditure to 30 September 2023 of £8,120,000. This is just under
12% of the currently approved Capital Plan.  General Capital Grant of
£6,812,000 has been received from the Scottish Government. Other grants
and contributions of £843,000 have also been received. In addition to this,
Developer Contributions of £413,000 have been received in quarter 1 of this
financial year and capital receipts of £608,000 for the sale of land and
buildings and vehicles.  The Council previously took advantage of flexibilities
allowed by the Scottish Government that allowed the Council to use capital
receipts to fund spend on Transformation projects. This flexibility ended in
2022/23 and unused receipts of £4,331,000 were transferred to the Useable
Capital Receipts Reserve and will be used in 2023/24 to fund capital
expenditure. 
4.2 Expenditure on land and buildings to 30 September 2023 totals £2,956,000.
The main items of expenditure is £496,000 on projects under the Moray
Growth Deal. Expenditure of £419,000 has also been spent on Place Based
Investment, a programme established by the Scottish Government to ensure
that local investment is relevant to local communities for the benefit of local
Page 78

Page 79

people. This expenditure is funded by capital grant from the Scottish
Government. 
4.3 Expenditure on infrastructure assets to 30 September 2023 totals £2,934,000.
The main items of expenditure were £300,000 on Road Safety projects and
£685,000 on various Harbours projects. 
4.4 Expenditure on vehicles, plant and equipment to 30 September 2023 totals
£2,230,000. The main item of expenditure was £1,682,000 on the Vehicle and
Plant Replacement Programme, a proportion of which is slippage from
2022/23 due to the current lead time for the delivery of vehicles. 
5. PROJECTED OUTTURN AND PROJECT DEFERRALS 
5.1 Budget managers have been asked to update projected estimates of
expenditure on capital projects in 2023/24.  The spend projections provided
by budget managers are based on the best information available at this time. 
Projects are graded for confidence of achieving projected expenditure with
high confidence rated as green, medium confidence as amber and low
confidence as red. A summary of the ratings is given in the table below. 
Risk Status RAG No of
Projects
Budgeted
Expenditure
2023/24   
£000
High confidence of spend to estimate G 104 31,793
Medium confidence of spend to estimate A 4 9,254
Low confidence of spend to estimate R 8 22,994  
116 64,041 
5.2 Red rating
A red status highlights areas where there is low level of confidence in
estimated expenditure. The following have been identified by budget
managers as having a red status:   
Project Para. Capital Plan
2023/24 
£000s
Projected
Expenditure
2023/24
£000s
Land and Buildings   
Refurbishment and Upgrade of Pools 5.3 600 
Early Learning and Childcare (ELC) (1
project)
5.3 110 2
Moray Growth Deal (3 projects led by
partners)
5.4 21,667 
Depots 5.4 1,500 -
Keith Salt Shed 5.4 117 17
TOTAL  23,994 19 
5.3 Refurbishment work on some of the planned leisure facilities projects was
dependent on the outcome of the Council’s bid for funding from Phase 3 of
the Learning Estate Investment Programme (LEIP).  The Council has been
Page 79

Page 80

notified that its bid for Buckie High School was unsuccessful and work will be
required to decide the future requirements there and there is therefore no
certainty on the spend requirements. However, a minimal level of works may
be needed to ensure that the facilities remain operational in the meantime if
urgent requirements were to materialise.  The ELC base at Portgordon
requires improvements as a result of a recent Care Inspectorate inspection
but there have been issues with the tender process, both in terms of
increased prices and lack of supplier engagement.  Work is ongoing to
ascertain the best way forward on this project. 
5.4 Three Moray Growth Deal projects currently include figures estimated in OBC
– these projects have submitted Full Business Cases to the Scottish
Government for approval and the OBC estimates appear unlikely to be
achievable in this financial year. The Depot and Stores Review is progressing
to a revised schedule due to the impact of RAAC on team capacity. A
strategic case is being developed and no spend on depots is anticipated until
agreement of the strategy and subsequent OBC. Minimal spend is anticipated
on the new Salt Shed in Keith by the end of the year as the project is being
reviewed in line with the larger Depot and Stores Review. 
5.5 Amber rating
An amber rating of confidence to spend budget highlights areas where there
are issues impacting on the ability to project spend – generally indicating
factors outwith the budget manager’s control. The following have been
identified by budget managers as having an amber status:   
Project Para. Capital Plan
2023/24 
£000s
Projected
Expenditure
2023/24
£000s
Land and Buildings   
NESS Energy for Waste Plant 5.6 5,304 5,304
Infrastructure   
Bridges (1 projects) 5.7 38 38
Vehicles, Plant and Equipment   
Vehicle and Plant Replacement
Programme
5.8 3,678 3,678
Children’s Play Area Equipment 5.8 234           234
234
TOTAL  9,254 9,254 
5.6 Spend on the Council’s share of the costs of the construction phase of the
NESS Energy for Waste Plant is dependent on the contractors achieving
agreed milestones which trigger payments and may be subject to change.
This is the last year of construction with the plant anticipated to be live in the
current financial year. An element of contingency was built into the budget
and it is not anticipated that this will be required in full.  However, under the
terms of the agreement the primary supplier is permitted to claim for
exceptional costs associated with a delay outwith their control.  The Project
Board, representing the Local Authorities’ interests, is in commercial
negotiations as to the value of this claim. Until these negotiations progress to
a later stage it is not possible to quantify any liability.
Page 80

Page 81

5.7 Expenditure on the planned project at Lea Bridge in Forres is dependent on
the findings of inspections. 
5.8 The lead time for vehicle replacements is very long due to issues with the
supply of small components to complete vehicles and there is therefore a high
degree of uncertainty as to when vehicles will be delivered. There is a similar
situation with regards to Play Area Equipment. 
5.9 Details of the projected variances as at September 2023 from the current
approved capital programme, summarised in APPENDIX 1, are set out below: 
Description Ref Underspend/
(Overspend)
£000s
Land and Buildings  
Schools BB Works 5.10 848
Elgin High School Extension 5.11 (25)
Learning Estate Strategy 5.12 379
Universal Free School Meals 5.13 398
Early Learning and Childcare (ELC Projects) 5.14 138
Moray Growth Deal  5.15 627
Moycroft 5.16 96
Depots 5.17 1,500
Salt Shed 5.18 100
Infrastructure  
Bridges 5.19 1,713
Flood Risk Management 5.20 (180)
Harbours 5.21 35
Vehicles, Plant and Equipment  
Orchard Road Signals 5.22 (45)
Climate Change – Solar Panels 5.23 500
TOTAL  5,959 
Land and Buildings
5.10 Schools BB Works – Projects under the Schools BB Works heading are
currently forecast to be £847,000 underspent. Works on fire alarm upgrades
at Keith Grammar and Forres Academy have been delayed to the summer of
2024 due to issues with Reinforced Autoclaved Aerated Concrete (RAAC) and
it is recommended that the underspend on these projects of £126,000 is
carried forward to allow those projects to complete. It is also recommended
that the remaining underspend of £721,000 be diverted to fund the works
required to rectify RAAC medium term recovery including ancillary works. 
5.11 Elgin High School Extension – A report to Education, Children’s and
Leisure Services Committee on 19 September 2023 (paragraph 17 of the
minute refers) provided an update on the the project to extend Elgin High
School and approved the Outline Business Case (OBC) for the project. It also
approved an increase of the capital funding of up to £19.3m. The
benchmarked project fee for taking the project to full business case, with a
detailed design and build proposition is £1,154,000. It is anticipated that
£202,000 of the cost will be in financial year 2023/24 with the remainder in
Page 81

Page 82

2024/25. It is recommended that the budgets in 2023/24 and 2024/25 are
amended to match this in order for this work to progress. 
5.12 Learning Estate Strategy – This budget is forecast to be underspent by
£379,000 due to the delay in the confirmation of Learning Estate Improvement
programme (LEIP) funding from the Scottish Government. Some initial work
on the Buckie High School design brief has taken place and it is therefore
requested that the forecasted underspend of £379,000 is carried forward to
2024/25 to allow this work to progress. 
5.13 Universal Free School Meals – Capital funding to support the roll out of
universal free school meals to all pupils in P4 and P7.  To date only the roll
out to primary 4 and 5 has been completed.  Current spend is an estimate on
the spend required to purchase additional equipment to support the increased
roll out.  Further work is to be carried out on the required capital investment
required by the end of the financial year and will be updated in future
monitoring reports.  It is requested that the projected underspend of £398,000
be carried forward to 2024/25. 
5.14 Early Learning and Childcare (ELC) Projects - Various projects under this
heading have seen issues with the tender process, both in terms of increased
prices and lack of supplier engagement.  The project at Aberlour is still
ongoing and final account is not yet agreed but it currently forecast to be
underspent. Other projects are forecast to be overspent due to higher tender
prices resulting in an overall underspend of £138,000. No budget adjustments
are requested at this time.   
5.15 Moray Growth Deal - Housing Mix Delivery and Cultural Quarter – The
budgets for these projects, which are led by the Council, included in the
capital plan are based on the Outline Business Cases and are currently
anticipating an underspend against the OBC profile of £627,000. The budget
will be amended once the Full Business Cases have been prepared and
approved by the Scottish Government and no amendments are therefore
recommended at this stage. 
5.16 Moycroft –  This project was complete in November 2020 and discussions
have been ongoing with the contractor to agree the amount of the final bill. In
2022/23 an estimate of the amount was made of the amount and accrued.
The final bill agreed is less than this estimate, resulting in an underspend of
£96,000. 
5.17 Depots - The Depot and Stores Review is progressing but pace has been
impacted by RAAC issues. No spend is anticipated until agreement of the
strategy and development of Full Business Cases to implement the Strategy
and it is therefore recommended that the budget of £1,500,000 is carried
forward to 2024/25. 
5.18 Salt Shed - Minimal spend on design, consents and site investigation works is
anticipated on the new Salt Shed in Keith by the end of the year as the project
is being reviewed in line with the larger Depot and Stores Review. It is
therefore requested that the forecasted underspend of £100,000 is carried
forward to 2024/25. 
Page 82

Page 83

Infrastructure
5.19 Bridges - A941 New Craigellachie Bridge – Work is currently ongoing on this
project with the next phase due to start in quarter 2. At this stage it is
projected that there will be an underspend of £274,000 in this financial year. 
Aldunie Bridge Cabrach/Dykeside Bridge – Unbudgeted expenditure of
£2,000 has been incurred in the current financial year relating to minor works
carried over from this project which was carried out in 2022/23.  The project
had a budget of £485,000 and outturned £425,000 in 2022/23 and will still be
under budget after taking this expenditure into account. 
Cloddach Bridge – The  Council at its meeting on 25 October 2023
(paragraph 6 of the minute refers) approved engaging external consultants to
prepare the Full Business Case for replacing Cloddach Bridge. The
community has raised £120,000 towards this cost with the Council paying the
balance. It is recommended that the forecasted underspend of £1,441,000 be
carried forward to next year pending future decision following completion of
the business case.  
5.20 Flood Risk Management – Compensation negotiations for the Findhorn
Flood Alleviation Scheme are ongoing and officers are working with the
District Valuer, landowners and their agents to try and reach agreement.
There is an element of uncertainty in how much these compensation
payments will be agreed and this has resulted in an overspend this year.
There are still three agreements outstanding on the Findhorn Scheme and it is
hoped that these will be settled before the end of 2024. However, one of
these agreements is subject to potential legal action, which increases the
uncertainty over cost and timing. 
5.21 Harbours – Work on various Harbour projects are forecast to be underspend
by a total of £153,000 due to the risk allowance built into budgets not being
required. It is requested to use £118,000 to increase the budget for capital
dredging, the tender for which has come in over the initial budget of £255,000. 
Vehicles, Plant and Equipment
5.22 Orchard Road Signals – Late invoices totalling £45,000 for the installation of
signals equipment were sent by the provider after year end which were not
taken into account in previous reporting.  The overall rise in project costs has
been down to the increase in construction costs experienced between 2020
(when the Project Mandate was completed) and 2023 (when the project was
completed). Additional work was also required to provide new electronically
controlled gates for a property whose access lies within the junction area. 
5.23 Climate Change – This was a generic allowance for expenditure related to
climate change and no definite proposals have yet been made although
proposals to install solar panels on various Council buildings are currently
being drafted.  These are at an early stage of development and no spend is
anticipated on this heading in 2023/24.  The potential for external funding is
being investigated.It is therefore recommended that the budget of £500,000 is
carried forward in full.
Page 83

Page 84

6. AMENDMENTS TO CAPITAL PLAN 
6.1 The following amendments to the capital plan are recommended:  
Amendments Para  2023/24
£000s
2024/25
£000s
Land and Buildings   
Schools BB Works 5.10 (126) 126
Elgin High School Extension 5.11 25 -
Learning Estate Strategy 5.12 (379) 379
Universal Free School Meals 5.13 (398) 398
Depots 5.17 (1,500) 1,500
Salt Shed 5.18 (100) 100
Infrastructure   
Bridges 5.19 (1,441) 1,441
Vehicles, Plant and Equipment   -
Climate Change  5.23 (500) 500
TOTAL  (4,021) 4,046 
7. ESTIMATED OUT-TURN 
7.1 The estimated outturn from budget managers has been revised to reflect
levels of slippage based expenditure to date and on levels of expenditure in
the last two  financial years (£31 million in 2021/22 and £28 million in
2022/23) . 
£000
Projected Spend notified per departments 63,441
Amend for Moray Growth Deal Projects (21,667)
Amend for slippage on red projects (708)
Amend for slippage on Amber projects (50%) (4,627)
Amend for slippage on Green projects (30%) (9,538)
Revised Estimated Out-turn 29,901 
8. RISK 
8.1 Budget managers have been asked to identify any specific areas of risk for
the projects in the capital plan for which they are responsible. 
Generic risks
8.2 Projects can be subject to risks which are outwith the direct control of the
Council, such as poor weather conditions.  Some assets such as harbours are
particularly vulnerable to bad weather events but there is potential for weather
conditions to impact across all lands and buildings and infrastructure projects. 
8.3 Lack of staff resources and staff turnover can impact on project timescales
and other emerging work priorities can impact in scheduled works and this is
reflected in delays where work planned to be out-sourced is being brought in-
house as a result of poor response to tender requests. 
Page 84

Page 85

8.4 There is a risk that time-limited funding is not spent within time-frame and that
the Council therefore loses the opportunity to improve or create assets at no
or reduced cost to the Council. 
8.5 There is a risk that contract inflation might increase the eventual cost of
projects in future years of the capital plan and a risk that any deferment of
projects relating to asset condition might result in element failure, potentially
incurring unbudgeted costs. The figures in the 10 year plan are based on
current costs and are likely to increase by the time the project is undertaken. 
This consideration will form part of the review of the 10 year plan. 
8.6  A risk to the capital plan in recent years has been an increase in the cost of
materials and scarcity of many materials which are key for the construction
industry. This is partly a world-wide reaction to the pandemic, and partly due
to Brexit, but the war in Ukraine is also having an impact. This is still seen as
a risk but the impact and likelihood is reducing. 
8.7 The cost to the Council of borrowing is based on interest rates at the time.
Continued relatively high levels on inflation are expected to mean that the
current pattern of interest rate rises is likely to continue and this will have an
impact on the cost to the Council and this will underpin the review of the 10
year plan as part of the financial planning process for 2024/25 and beyond. 
Project specific
8.8 The Climate Change Route Map to Net Zero, setting out how the Council
plans to achieve its target of net zero carbon by 2030, has not been
incorporated into the capital plan.  As projects in the plan are developed
carbon factors will be taken into account.  The impact will be increased costs
for many projects.  Where specific actions in the Route Map entail capital
expenditure these will be included in the capital plan, subject to a business
case being approved for the inclusion of the action. 
8.9 The main current risk for the vehicle replacement programme is extended
lead in times of up to 24 months due to industry conditions, although lead in
times are now gradually shortening.  There are pressures on the programme
due to targets for local authorities to de-carbonise their fleets, which also
entails developing the infrastructure to support electric vehicles. 
8.10 The Council’s Learning Estate is generally of a poor condition and this carries
the risk of unplanned work being required to avoid unplanned school closures.   
8.11 No other project risks have been specifically identified by budget managers. 
There are risks relating to Moray Growth Deal projects which are monitored
by the MGD Programme Board – these will be added to the risks reported on
the Council’s Capital Plan as and when Full Business Cases are approved
and projects led by partners go live. 
9. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Page 85

Page 86

Effective budget management is an essential component of delivery of
Council priorities on a sustainable basis. 
The capital plan is one of the vehicles through which the Council’s
priorities can be delivered. The approved capital plan for 2023/24 and
the outline ten year plan incorporates measures designed to address the
LOIP priorities of building a better future for our children and young
people, empowering and connecting communities and developing a
diverse, inclusive and sustainable economy. 
(b) Policy and Legal
There are no policy or legal implications arising directly from this report. 
(c) Financial implications
The financial implications are highlighted within the report and
Appendices 1 and 2 to the report. 
(d) Risk Implications
Budget managers are aware of their responsibilities for managing budget
allocations and approval for variance will be sought from Council in line
with the financial regulations. Risks specific to items within the capital
plan are highlighted in paragraph 7 of this report. 
(e) Staffing Implications
There are no staffing implications arising directly from this report 
(f) Property
There are no property implications arising directly from this report. 
(g) Equalities/Socio Economic Impact
There are no equalities issues arising from this report. 
(h) Climate Change and Biodiversity Impacts
There are no climate change or biodiversity issues arising directly from
this report.  Achieving net zero will have significant implications for future
planned capital expenditure 
(i) Consultations
All capital budget managers have been consulted in the development of
estimated actuals as part of the preparation of this report.  Members
ofthe Asset Management Working Group, all Heads of Service and the
Corporate Management Team have been consulted and any comments
incorporated in the report. 
10. CONCLUSION 
10.1 Capital expenditure in the first quarter of the year amounts to £8,120,000
to the end of September 2023. 
10.2 Capital expenditure is currently projected to be £29,901,000 lower than
the approved capital plan for 2023/24 but with a high degree of
Page 86

Page 87

uncertainty due to current construction industry conditions and other
external factors. 
10.3 Amendments to the Capital Plan amounting to a decrease of £4,021,000
in 2023/24 and an increase of £4,046,000 in 2024/25 are recommended. 
Author of Report: Laurie Milne, Senior Accountant
Background Papers: 
Ref: LM/LJC/SPMAN-1293228629-915 
Page 87

Page 88

Page 88

Page 89

Moray Council Capital Programme 2023/24
As at 30 September 2023
APPENDIX 1
Capital Plan
2023/24 Actual Q1 Q2 Q3 Q4
Amended
Capital Plan
£000 £000 £000 £000 £000 £000 £000
Land and Buildings
Education, Children's and Leisure Services Committee 8,923 833 18 814 2,724 3,754 7,310
Economic Development and Infrastructure Committee 39,728 2,116 206 1,911 4,305 32,583 39,005
Corporate Committee 1,679 7 1 6 0 72 79
Infrastructure
Economic Development and Infrastructure Committee 13,218 2,933 736 2,197 5,252 3,465 11,650
Vehicles Plant and Equipment
Education, Children's and Leisure Services Committee 202 46 14 32 76 80 202
Economic Development and Infrastructure Committee 4,427 1,946 1,263 688 1,146 1,375 4,472
Corporate Committee 1,223 239 29 211 259 224 723
69,400 8,120 2,267 5,859 13,762 41,553 63,441
5,959
Funding
Prudential Borrowing 50,799 85
General Capital Grant (exc PSHG and CYPA) 8,789 6,812
Other Grants & Contributions 0 0
Developers Contributions 124 412
Moray Growth Deal 9,532 203
Receipts 156 608
69,400 8,120
Projected Expenditure
Item 10.
Page 89

Page 90

Page 90

Page 91

Major Capital Projects spanning more than 1 financial year (as at 30 September 2023) APPENDIX 2
Description Approved
Total
Budget
Total
Expenditure
in previous
financial
years
Current
Budget
2023-24
Actual
spend
2023-24
Remaining
Budget
2023-24
Project
Life Spend
to 31/03/24
Projected
Future
Years
Budget
Required
Estimated
Final Cost
Projected
Variance
£000 £000 £000 £000 £000 £000 £000 £000 £000
NESS Energy from Waste 27,224 22,092 5,304 914 4,390 22,834 27,224 0
Moray Growth Deal
Bus Revolution 4,000 480 681 45 636 525 2,839 4,000 0
Early Years STEM 4,800 0 200 200 0 4,600 4,800 0
Housing Mix Delivery 7,500 77 1,973 243 1,730 320 5,450 7,500 0
Cultural Quarter 23,802 42 903 86 817 128 22,857 23,802 0
Digital Health 5,000 2,391 2,341 122 2,219 2,513 268 5,000 0
Business Enterprise Hub 5,268 0 3,915 3,915 0 1,353 5,268 0
Moray Aerospace, Advanced
Technology and Innovation
Campus
27,035 0 17,601 17,601 0 9,434 27,035 0
Manufacturing Innovation Centre 6,832 0 151 151 0 6,681 6,832 0
Total 111,461 25,082 33,069 1,410 31,659 26,320 53,482 111,461 0
Item 10.
Page 91

Page 92

Page 92

Page 93

REPORT TO:   MORAY COUNCIL ON 6 DECEMBER 2023 
SUBJECT: SMARTER WORKING PROJECT – PROGRESS UPDATE 
BY:  DEPUTE CHIEF EXECUTIVE (ECONOMY, ENVIRONMENT AND
FINANCE) 
1. REASON FOR REPORT 
1.1 This report provides an update on progress with the Smarter Working project. 
1.2 This report is submitted to Council in terms of Section II (15) of the Council's
Scheme of Administration relating to the provision of office accommodation
for all departments of the Council. 
2. RECOMMENDATION 
2.1 It is recommended that the Council considers and: 
i) notes progress on the project to date; 
ii) notes the overall recurring reduction in revenue budgetary 
requirements of £65k for 2023/24 and recurring savings of £115k 
from 2025/26 as set out in paras 4.14 to 4.23; and 
iii) approves the additional one-off £30k outlined in para 4.11 for 
telephony and communication equipment for Buckie Phoenix 
House. 
3. BACKGROUND 
3.1 Reports detailing progress on the office review and the updated flexible
working policy were provided to Moray Council at the meeting on 30
September 2022 (para 13 and 14 respectively of the minute refers) when the
updated Flexible Working Policy was also approved. The Smarter Working
Outline Business Case (OBC) was approved on 2 February 2023 (para 14 of
the minute refers). That outlined the strategic objectives for Smarter Working,
to ensure that efficient and effective use was made of assets, reducing
operational costs through rationalisation of offices and provision of enabling
ICT infrastructure and equipment for office-based staff to ensure functional
spaces meet identified service needs, in line with the application of agreed
principles and standards.  The Full Business Case (FBC) for Smarter working
was approved at a meeting of Moray Council on 28 June 2023 (para 14 of
the minute refers).  Given the financial context, the approach approved by the
Item 11.
Page 93

Page 94

Council within financial constraints and a significant budget gap was that the
project should, as far as possible, be delivered within existing budget or from
recurring savings identified in the project. Where essential, any additional
expenditure required was to be kept to the minimum whilst supporting
functional requirements, with scope to enhance provision to more fully meet
the aspirations of the project deferred until the approach to bridging the
budget gap was clearer. 
3.2 The initial focus was to rationalise use of space in the HQ Campus, releasing
capacity to decant other offices into the campus.  Phase 2- other Elgin offices
and 3- out of Elgin offices were to ensure adoption of Smarter Working
principles for these spaces and provision of hybrid meeting equipment. The
approved flexible working policy outlined the default position for hybrid
working of 2 days in the office and 3 at home which supports the baseline
adopted for the project of a desk space allocation of 50% of total Full Time
Equivalent (FTE). 
4. STAGED APPROACH 
4.1 The agreed approach for the Smarter Working project, reflecting the financial
parameters, was described as:-   
Hybrid Working (minimum) – reuse furniture, some improvement to Wi-Fi
coverage, provision of hybrid meeting hardware, some rationalisation of
office buildings and improved access for welfare facilities for community-
based staff. 
4.2 As anticipated, as services have progressed with consolidation of hybrid
working in terms of the Smarter Working project, other opportunities for
rationalisation of property which may identify further savings have been
identified for further consideration, whether to contribute towards reducing
the budget gap or to provide enhanced smarter working solutions.   
4.3 The updated position for Offices in scope for potential rationalisation is set
out in table 1 below.  There have been some changes to the last report in
June, due to rationalisation which has already taken place in the HQ campus
and discussions held that have identified other opportunities for further
investigation.  Some offices listed will be retained at present as there is no
easily identifiable alternative, however staff operating from them should adopt
the standards and principles of hybrid working:- 
Phase Address Current Status 
1 – HQ
Campus 
Council Headquarters
Annexe
Rose Cottage
Retain 
1 – Other
Elgin
9 North Guildry Street Services relocated to HQ
campus.  
Progressing through surplus
property process 
2 – Other
Elgin
9a & 9c Southfield (NHSG lease
for HSCM staff)
In scope – Services
scheduled to relocate to HQ
campus December 2023
Page 94

Page 95

Phase Address Current Status 
11 North Guildry Street Retain 
232-240 High Street In scope - status amended by
decision of Moray Council 25
October 2023)
Beechbrae and 10 Duffus Road In scope 
3 - Out of
Elgin
Buckie Townhouse Retain 
13 Cluny Square, Buckie In scope – Staff to vacate to
Phoenix Centre/Townhouse
by March 2023.
Keith Community Hub, Keith Retain 
Phoenix Centre, Buckie Retain 
Declared
Surplus
30 – 32 High Street Surplus Building process
being followed
Table 1 
Workspace Design and Implementation
4.4 Following engagement with services, managers and early adopters in Phase
1- HQ campus, service requirements across all services were collated. Staff
numbers included in Phase 1 HQ campus and Rose Cottage are shown in
table 2 below. Whilst there has been a slight increase in staff working full
time in the office in some areas since the Smarter Working Project spatial
reallocations were implemented due to specific service delivery reasons, it
has not had any material impact on the plans for desk allocations which were
therefore largely accurate. 
Service Home Hybrid Office Total
Chief Executive
Section 
6 FTE
(6 staff) 
6 FTE
(6 staff)
Economy,
Environment and
Finance
18.88 FTE
(22 staff)
290.81 FTE
(310 staff) 
52.37 FTE
(58 staff)
362.06
(390 FTE)
Education,
Communities and
Organisational
Development
20.95 FTE
(23 staff)
210.62 FTE
(249 staff)
52.07FTE
(57 staff)
283.64 FTE
(329 staff)
Health and Social
Care Moray
1 FTE
(1 staff)
114.94 FTE
(141 staff)
23.46 FTE
(30 staff)
139.4 FTE
(172 staff)
Total  40.83
(46 staff)
622.37 FTE
(706 staff)
127.9 FTE
(145 staff)
791.10 FTE
(897 staff)
% FTE workstyle  5.2% 78.6% 16.2% 100%
Estimated % prior
to office moves
5.3% 79.1% 15.6% 100%
% change -0.1% -0.5% +0.6 
Table 2  
Page 95

Page 96

4.5 The collated service requirements informed a revised allocation of office
space, meeting rooms and storage and the proposal for service locations
was agreed with Heads of Service in July 2023, with implementation of office
moves during September and October 2023. Verbal feedback has been very
positive, in particular as regards the benefits for collaborative working
enhanced by co-locating teams that hybrid working enabled through the
reduction of desk requirements.   
4.6 It was estimated in the June report that between 120 and 150 desks would
be available across the campus to accommodate rationalisation of more
Council offices or to accommodate partner organisations once 9 North
Guildry Street and Southfield staff have moved into the campus. The actual
reduction achieved in service desk numbers is illustrated below in table 3,
however, the overall desks available is lower (Table 4) due to spatial and
equipment configuration, storage, formation of additional meeting space and
assessed service needs which have been confirmed as office moves were
bedded in.     
HQ Campus and 9 North Guildry Street
4.7 Whilst the target is to achieve 50% allocation of desks for FTE, due to the
requirement for adjustments where roles are not suitable for hybrid working
or individuals are not able to work this way, this will be difficult to fully achieve
in reality.  In addition, in some offices the capacity of the room is slightly
larger than ideal allocation.  Overall, the current allocation is sitting at 57.89%
and 220 desk spaces have been released.   
Service Campus
FTE
50%
FTE
desks
Pre
Covid-
Desk
allocation
Revised
allocation
Actual
Reduction
in desk
numbers
% desk/
FTE
Chief Executive
Section
6 3 6 7 (1) 116.6%
Economy,
Environment and
Finance
362.06 181 298 204 94 56.34%
Education,
Communities and
Organisational
Development
283.64 142 280 166 114 58.52%
Health and Social
Care Moray
139.40 70 94 81 13 58.11%
Totals 791.10  396 678  458 220  57.89%
Table 3 
Desks summary
4.8 Through the office moves 31 desk spaces have changed function, have been
altered into new meeting rooms, storage or reallocation to Heads of Service
rooms.  30 Health and Social Care Moray (HSCM) staff (23.96 FTE) have
moved into the campus from Rose Cottage with an allocation of 13 desks
and in December, 101 staff (89.47 FTE) will be moving from Southfield to the
Page 96

Page 97

HQ campus and will be allocated 47 desks.  Hot desks will continue to be
available for all staff to use to ensure that there is the ability to flex as service
delivery requires.  Once all scheduled moves are completed there will be 
circa 121 desk spaces currently available to accommodate other services
shown in table 4.  If the services from other Elgin offices in scope are
incorporated into the Campus then initial estimate is 60 desks plus meeting
and storage space would be required and this will be taken forward in the
new year. 
Building Desks Remaining Available
HQ  471 Circa 96 desks
Annexe 223 Circa 15 desks
(plus 45 hot desks)
Rose Cottage 25 Circa 10 desks 
Total 719 121 desks (plus 45 hot desks)
Table 4 
Project Investment Objectives
4.9 Progress on the objectives of the project is outlined in APPENDIX I.  Actions
for 2023 have been achieved albeit with slight delays against target
timescales.  Remaining objectives are on target and there is an improvement
in the efficiency of use of the campus, with a 15% increase from July 2022 in
the number of staff utilising the HQ campus by the end of December 2023
and a corresponding decrease in cost per FTE of 12.9%.   
Office Rationalisation Outwith HQ Campus - 13 Cluny Square, Buckie 
4.10 The move of services from 13 Cluny Square to Buckie Townhouse and
Phoenix Centre, Buckie was agreed in principle by the Asset Management
Group in March 2023.  This proposal was to enable the release of 13 Cluny
Square, which would then move to the “Surplus Property” process.  The
report on 28 June 2023 to the Council outlined the issue of timing of the
move was dependent on British Telecom prioritisation for telephony works,
which was outwith our control.  The report also highlighted there would a
one-off infrastructure cost of £13k. 
4.11 Confirmation of a way forward with BT has now been agreed and as a result
of the national rolling programme for changing analogue to digital telephony
being implemented by BT, the one-off infrastructure cabling costs have
increased slightly for £13k to £15k, and there are new unavoidable costs
outwith our control, for telephony and network equipment, amounting £28k
which is therefore a budget pressure.  The total costs of the works have risen
from £21k to £52k as shown in table 5 below.  However, the operational
costs of Cluny square have also increased so recurring saving on costs per
year once Cluny Square is released has increased from £39k to £50k. 
Allowing for these adjustments, the payback period was originally 6.3 months
and is now 13.2 months, which remains a good viable option for the
improvement to space for service delivery and for improving space utilisation
in Buckie Townhouse.  The Asset Management Group are supportive of this
project because of the improved efficiency of use of the Townhouse and
Phoenix Centre, the saving in operational costs for Cluny Square and the
opportunities as the premises progress through the surplus property process,
however an additional one-off budget of £31k is required for this change. 
Page 97

Page 98

Works Require for Buckie Townhouse and Phoenix 
Initial Costs March 23 Current Costs Nov 23
Capital  
ICT cabling £13,400 £15,300
New network
hardware and
telephony
nil £28,100
Total Capital  
Revenue  
Removal/Office
moves
£7,000 £8,600
Total Costs £20,400 £52,000   
Cluny Square
Operating Costs
£39,000 £50,000
Payback period 6.3 months 13.2 months 
Table 5  
4.12 If the Council provides approval to proceed, works would be  scheduled with
a target for staff to relocate prior to the end of March 2024.  The delay in
progress means the previously predicted saving for 2023/24 of £10k
operational costs for Cluny Square will not be realised however subsequent
years will produce a £50k recurring saving. 
4.13 Due to increasing operational costs of the buildings identified for
rationalisation during the Smarter Working project of 9 North Guildry Street
and 13 Cluny Square, Buckie the total recurring savings from 2024/25 will
increase from £50k to £65k.  The predicted saving in 2023/24 of operational
costs has reduced from £20k to £7.5k due to delays outwith our control. 
COSTS
Enabling works
4.14 The HQ campus, Beechbrae, 11 North Guildry Street, Buckie and Keith
offices have been provided with equipment to facilitate hybrid meetings.   The
HQ campus has Wi-Fi coverage for all meeting rooms, break out areas and
training rooms.  Where requested, Heads of Service and CMT have been
provided with sets of equipment, and their rooms can be used when they are
out of office.    It is anticipated that the approved budget will be spent. 
Committee Room
4.15 A limited refurbishment of the Committee Room has provided an improved
environment and a higher specification of hybrid meeting solution within the
approved budget. 
Office Furniture
4.16 Whilst every effort has been made to reuse existing furniture, as anticipated
40-50 office chairs required to be replaced as they have been used to
support working at home, others are worn out and are not sufficiently
adjustable for different people using them.  Replacement of some existing
meeting room chairs that are of poor condition and provision for furniture for
Page 98

Page 99

an additional seven meeting rooms is also required to accommodate an
increase in staff operating from the HQ campus, and it is anticipated the
approved budget of £20.2k will be fully utilised. 
Wi-Fi Connectivity
4.17 All meeting rooms, break out areas and training rooms in the HQ campus are
now provisioned with Wi-Fi and also other Elgin and out of Elgin offices. 
Should additional meeting rooms or collaborative spaces be required there
may be an additional requirement for further Wi-Fi access points and an
estimate of £3k has been identified for 2024/25. 
Other Costs
4.18 In order to implement the rationalisation of office space an allowance for
moving office costs was made.  For the HQ campus, labour was sourced
from within Council services and due to the efforts of all staff involved, the
costs are less than budgeted at circa £5k.  Future planned moves will require
external contractors due to the scale and manpower required.   The
expansion of use of swipe access cards for Phoenix House, Buckie and Keith
Community Hub will improve access for some services working out of hours
and all budget will be utilised.  Docking stations provide simple connection
from laptop to monitors and reduce issues with damage to cables and the
budget will be fully utilised.   
Project Resource
4.19 The Senior Project Officer is in post until December 2023 with funding of
£53k for 2022/23 and £54k for 2023/24 approved on 2 February 2023
meeting of Moray Council (para 14 refers).  Due to a pay award that was not
foreseen in the original budget there is an estimated shortfall of £9k for
2023/24. 
4.20 Funding of £13k for 2022/23 and £64k for 2023/24 totalling £77k was
approved at the 2 February 2023 meeting (para 14 refers) for resources to
undertake the ICT work related to developing, testing and implementing the
telephony strategy and Wi-Fi solutions and the workforce engagement and
development demands that are required to facilitate the implementation of
the Smarter Working Project.   Due to the specialised nature of some of this
work, recent experience of difficulties in recruiting suitably qualified and
experienced ICT Officers and the short timeframe within which the Smarter
Working Project was working within it was decided to proceed with tasks for
Smarter Working Project work through use of additional hours where
possible and re-prioritisation of medium and low priority works for the
duration of the project.  An assessment was to be taken after 6 months to
consider the impact on other projects or tasks using the budget to backfill the
outstanding residual work. 
4.21 This assessment has been undertaken and to date no additional budget for
ICT staff has been drawn down.  Tasks have been spread across a number
of staff from the Server and Network, Support and M365 Teams to mitigate
the impacts.   
4.22 Additional hours have been undertaken by the Organisational Development
team amounting to £4.5k but other hours amounting to 480 hours have been
Page 99

Page 100

accommodated through adjusting timescales for other projects or delaying
starts for example for policy work timescales. 
4.23 The efforts of existing staff within these services should be recognised as
there is a significant saving achieved in staff resources for the project. 
Sources of Funding
4.24 As reported previously the reduction in the business miles travel expenses
claimed of £50k savings is being maintained and can be retained as a
recurring saving. This is combined with the office rationalisation savings in
operational costs of £65k giving a recurring total of £115k pa from year 3. 
The project will also now generate overall savings in Year 2 rather than Year
3 as predicted in the June report. 
4.25 The summary of the financial impact from the FBC is included in Table 6
below which demonstrates the project will be delivered within approved
budget and will achieve a revenue recurring of £95k in year 2 which is a year
earlier than originally estimated.  The efforts of all staff who have supported
the changes introduced through the project are to be commended as they
have facilitated the savings to be realised. 
Summary of financial appraisal: 
a b c d e f b+d+e+f
£  Year 0
budget
2022/23
Year 0
actual
2022/23
Year 1
2023/24
Year 1
Estimate
d actual
Year 2
2024/25
Year 3
2025/26
Total 3
year
projectio
n
£ £ £ £ £ £ £
Preferred choice:
Capital       
ICT infrastructure and Wi-
Fi/Hybrid meeting equipment
15k
(note 4)
3.6k 35.1k 75.9.5k
note
5.4k n/a 84.92.5k
Furniture  n/a 20.2k 20.2k n/a n/a 20.2k
Total Capital Spend 15k 3.6k 55.3k 96.1.7k 5.4k n/a 105.1k 
Table 6
Revenue        
Project Staffing
(budget already approved Note 1)
66k 53k 118k 67.5k n/a n/a 120.5k 
Removals/Office Moves n/a n/a 27k 18.6k 20k n/a 38.65k
Total Revenue Spend 66k 53K 145k 86.1 20k 0k 159.1k 
Funded by:
Mileage reimbursement 50k 50k 50k 50k 50k 50k 200k
Reduced building operating
costs
n/a n/a 15k   7.5k
Note 2
65k  65k 137.5k
Income from leased desk space n/a n/a  Note 3   
Total Revenue Income 50k 50k 65k 57.5k 115k 115k 337.5k
Total Revenue Savings (16k) (3k) (80k) (28.6k) 95k 115k 178.4k
Page 100

Page 101

• Note 1 – budget for the Senior Project Officer (SPO) was approved and £53k
was funded from capital receipts in 2022/23.  Budget for SPO £54k in
2023/24 and additional ICT and OD staffing of £77k was approved at Full
Council on 2 February 2023 (para 14 of the Minute refers).  Actual costs for
SPO have increased by £9k due to a pay award not foreseen in the original
budget request however only £4.5k budget for OD/ICT costs result in saving
against budget of £50.5k as per para 4.20. 
• Note 2 – Operational costs for 9NGS and Cluny Square, Buckie have
increased and therefore the recurring saving in costs has increased for future
years.  The estimate for 2023/24 savings is reduced due to the delay in
Cluny Square being released albeit there is a small offset with the saving on
costs for 9NGS being higher. When HSCM staff move to HQ campus from
Southfield (by December 2023) there will not be a direct saving for Moray
Council however there will be reduction in the risk of requirement to
contribute to Moray Integration Joint Board overspend as a result of their
saving on accommodation costs for Southfield.   
• Note 3 – there is interest from some partner agencies to lease desk space at
HQ campus.  This is an area for further investigation as a source of income
and will be taken forward by the Asset Management Team. 
• Note 4 – unspent capital budget of £11.4k was carried forward to 2023/24 as
the timing of the approval from Council meant the lead time and expenditure
for receipt of ICT kit was in 2023/24. 
• Note 5 – this figure includes the additional budget of £31k required for Cluny
Square works as set out in para 4.11 
5. NEXT STEPS 
Other Opportunities
5.1 The Smarter Working project has delivered the initial objectives of
establishing the framework, principles and facilities for hybrid working.  The
rationalisation of the office accommodation and the capacity released
provides opportunity for consideration of other Elgin offices for rationalisation. 
It was initially intended that following the Smarter Working project business
as usual would be absorbed in house.  However due to further opportunities
being identified the Council at the special meeting on 25 October 2023 (para
14 of the draft minute refers) agreed to fund a project resource for 15 months
to March 2025 to progress this. 
5.2 The review of the Additional Support Needs (ASN) function currently based in
Beechbrae offices (including 10 Duffus Road, Elgin) has progressed and an
outcome was the decision that this function will not continue in its current
form at Beechbrae.  Other services currently based at the Beechbrae
campus are early learning, educational psychologists, children and family
social work teams, reviewing team and youth justice.  Discussions with
services and options for alternative space provision that meet service needs
require to be progressed to identify options for releasing the Beechbrae
campus. 
Page 101

Page 102

5.3 Grampian Valuation Joint Board have confirmed they are open to
consideration of alternative accommodation options which offers an
opportunity to consider rationalisation of 232 - 240 High Street. 
5.4 A report with an update on the Depot and Stores Review was considered at
Economic Development and Infrastructure Services Committee on 20 June
2023 and approved (paragraph 13 of the Minute refers). One of the
objectives is to rationalise depot office accommodation where possible using
the same principles and standards agreed for smarter working.  Capacity in
the HQ campus has been identified so there is potential for some relocation
of appropriate teams to the HQ campus thought this will only happen if it
meets operational principles for both projects.  Discussions will be taken
forward with management and teams to assess viability and suitability of this
opportunity.   
5.5 Work is progressing with the review of the Learning Estate identification of
spare capacity may present opportunities for use for office accommodation or
other service requirements, depending on location.  Some services have
highlighted long term aims for bases in communities which could be
accommodated within existing provision at present, but the outcome of the
Learning Estate review may present other opportunities for appraisal.  This
will be taken forward during 2024/25.    
5.6 Work is now progressing on confirming business as usual processes,
monitoring mechanisms and collation of an end of project (phase 1) report 
due to a change in project officer and to ensure lessons are learnt for future
phases.  Development of the next phase of implementation of Smarter
Working and rationalisation of office accommodation is also ongoing. 
Progress with the project will continue to be reported to and monitored by the
Transforming the Council Board and also to committee as required. 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
This project forms part of the Improvement & Modernisation Programme
(IMP) of Work that supports the Council priorities of effective asset
management and digital services of a financially stable Council. 
(b) Policy and Legal
The Flexible Working policy was approved 28 September 2022 and
provides the framework for the implementation of Smarter Working.   
(c) Financial Implications
The financial implications of this report are contained within paras 4.10
to 4.25. These identify one-off revenue costs of £86.1k for the current
year and estimates of £20k for 2024/25 to be recovered by revenue
savings generated during the three-year period at the end of which
there will be an estimated £115k recurring revenue saving.    Capital
costs of £105.1k are anticipated to be required on a spend-to-save
basis.
Page 102

Page 103

(d) Risk Implications 
The development of sustainable principles and standards for adoption
across all offices will facilitate identification of office accommodation to
be retained (and use maximised), and others to be disposed of.   
As the Council progresses through the process to reduce the budget
deficit, decisions may be taken that impact on service requirements for
space.  This aspect will be monitored throughout the project and any
impacts will be identified and mitigated or escalated as appropriate. 
All services have moved within the HQ campus and there will be a
period of time required to allow teams and individuals to adjust to the
new environments.  Where there are future plans to accommodate
more teams in the campus it will be essential to consider the impacts on
interview and meeting rooms carefully to ensure continuation of existing
service delivery. 
(e) Staffing Implications
The Council at its meeting of 2 February 2023 (para 14 of the minute
refers) agreed budget provision for staffing resource to support the
implementation of the wider adoption of flexible working, as part of the
Improvement and Modernisation Programme, for a 6-month period to
the indicative end of project of £77k (salary including on cost).  These
resources were in addition to the request for an extension of up to 6
months for the Senior Project officer contract which was also approved
of £54k. A budget shortfall has arisen of £9k resulting from a pay award. 
Due to the short timeline and the specialist knowledge required
following discussions with staff it was determined that capacity be
created internally within technical or expert roles and tasks delegated or
deferred to other officers.   Part-time staff with capacity to do extra
hours have provided additional resource to date.  This approach has
resulted in a saving on the budget provided of £50.5k. 
(f) Property 
These are set out in the report. 
(g) Equalities/Socio Economic Impact
A full Equalities Impact Assessment was provided to the meeting 28
June 2023 and following office moves no new concerns have been
highlighted. Arrangements to monitor the impact have been
implemented, including monitoring the number and type of requests for
assistance from the Human Resource team to apply existing policy and
process, to ensure any escalation in numbers relating to equality issues
are acted on.   
(h) Climate Change and Biodiversity Impacts 
An assessment of the impact on the Council carbon footprint of the
introduction of sustainable hybrid working was incorporated into the Full
Business Case.  Using information received following the service
engagement and subsequent confirmation of individual’s workstyle
Page 103

Page 104

shows 85% of staff will be hybrid working (or home working full time)
and therefore there will be a reduction in commuting. Using data
collected for the annual Public Bodies Climate Change Duties Report
2023, the climate change team have estimated that by avoiding a full
return to business as usual (5 days office working) we are avoiding
carbon emissions of over 10,000tCO2e annually. Work is required to
improve the input data and refine assumptions going forward to ensure
ongoing reliability, but it is a promising start. This information will feed
into discussions as part of the update to the Council’s Climate Change
Plan and Routemap to Net Zero Emissions. 
(i) Consultations 
Consultations on this report have taken place with the Smarter Working
Board, Smarter Working Delivery Group, CMT and Chief Financial
Officer, and Democratic Services Manager and any comments have
been incorporated into the report. 
7. CONCLUSION 
7.1 This report provides an update on the progress of implementation of
the Full Business Case for Smarter Working and the next steps for
Smarter Working to facilitate rationalisation of other offices in Elgin that
will provide recurring revenue savings whilst ensuring continuity of
service and maintaining standards of accommodation for staff. 
Authors of Report: Edward Thomas, Head of Housing and Property
Services, Jeanette Netherwood, Senior Project officer
(Smarter Working) 
Background Papers:  28 June 2023 – Smarter Working Project – Full Business
Case  
2 February 2023 – Smarter Working Project – Outline
Business Case  
28 September 2022 Office Review Update – Smarter
Working  
28 September 2022 Flexible Working Policy Review 
30 June 2021 Office Review 
Census Results 
Local Government Case Study – reduction in carbon
footprint 
Emissions Impact of Homeworking in Scotland 
Ref:    SPMAN-1285234812-1455  
Page 104

Page 105

APPENDIX I
Smarter Working – Objectives and Performance Indicators 
Strategic Aims  Objective
Statements at
CMT/SMT 15/8/22
SMART Objective  Indicators  Current Position
Learning and Growth 
• Develop the
organisational
culture, skills
and environment
to embrace and
embed flexible
and hybrid
working 
• Improve
organisational
resilience 
• Prepare the
organisation and
workforce to
embrace new
ways of working 
• Increase
confidence in use
of new technology
to support hybrid
working
Increase % staff adopting
flexible and hybrid working by
September 2023 
Deliver smarter working training
to all 3rd and 4th tier managers
June 2023 
Increase from existing baseline
staff confidence in the use of
digital tools and skills by April
2024 
Update all induction materials to
reflect the organisational change
to embed hybrid working by
September 2023.
% staff adopting flexible
and hybrid working 
% managers trained 
Increase in Staff
confidence/satisfaction
following training on
digital tools courses 
% Induction materials
updated
79.1% staff in HQ
campus are adopting
hybrid working 
All managers provided
with opportunity and
materials 
Hybrid training sessions
well received and staff
using kit. 
100% corporate
induction materials
updated
Workforce 
• Improve
employee
motivation,
morale and
wellbeing 
• Engage and
consult on the
approach to and
implementation of
hybrid working 
To communicate widely the
journey to embed hybrid working
and how it will enhance
productivity 
% progress with
communication &
engagement plan 
90% project intranet
page updated, regular
communications issued. 
Item 11.
Page 105

Page 106

Strategic Aims  Objective
Statements at
CMT/SMT 15/8/22
SMART Objective  Indicators  Current Position
• Attract and retain
quality, creative,
motivated and
productive staff 
• Attract and retain
high quality
workforce
75% of staff, with hybrid working
roles, satisfied with working
arrangements by March 2024
Increase from existing baseline
in % of staff who think working
from home either part of full time
continues to have a positive
impact on their mental health. by
2024 
Increase the average number of
applicants to posts suitable for
hybrid working, by 10% by
March 2024 
% staff who feel working
part or full time at home
continues to have a
positive impact on their
mental health 
Average number of
applicants for hybrid
posts by type of role 
Short survey to be
carried out Feb 2024
relating to impact of
working at home on
mental wellbeing 
Not due for reporting 
Property 
• Provide
seamless access
to sustainable,
modern working
environments
which support
delivery of high
quality, efficient
and effective
services 
• Provide a strategic
overview of
council offices and
their use 
• Provide digital
solutions that
enable people to
work from suitable
locations 
100% of staff whose role is
suitable for hybrid working,
provided with equipment to work
in a hybrid style by September
2023 
Equip 12 small and 5 large fully
operational hybrid meeting
rooms by June 2023 
All office meeting room and
collaborative working spaces
% hybrid working office
staff provided with
necessary equipment 
Number of meeting rooms
fully operational 
Achieved 
Achieved by July 2023. 
Committee room has
also been provided with
high specification kit. 
Page 106

Page 107

Strategic Aims  Objective
Statements at
CMT/SMT 15/8/22
SMART Objective  Indicators  Current Position 
• Reduce the
environmental
footprint of our
working
practices
• Identify
opportunities to
co-locate services
to improve joint
working 
• Reconfigure office
layouts providing
the right spaces to
facilitate
productive service
delivery and
creative
collaborative team
working.
provided with good quality Wi-Fi
coverage by end of 2023 
Secure Wi-Fi access available
for third party access in
collaborative work spaces by
end of 2023 
Reduction in carbon emissions
from Council offices per FTE by
end of 2025 
% meeting rooms and
collaborative spaces with
Wi-Fi coverage 
Reduction in total carbon
emissions from offices
per FTE 
Achieved in HQ campus
and will be in other
offices by end of 2023. 
Delayed due to new
national contract. 
Target date revised to
April 2024. 
Not due for reporting
Financial 
Increase efficiency
and effectiveness of
utilisation of
functional spaces
within Moray
Council office
accommodation,
reducing the cost of
running the council
• Identify and
evaluate
opportunities to
reduce property
operational costs
through a
programme of
rationalisation 
Reduce total operational costs
for office buildings by 2025 
Reduce the operational property
costs by 5% per FTE for council
offices by end of financial year
2023/24 
Total office operational
costs 
Reduction in office
operational cost per FTE 
Total Income generated
from lease of office space 
Not due for reporting 
Budgeted Operating
costs 2023/24 reduced
by 10% per FTE for HQ
campus. 
Page 107

Page 108

Strategic Aims  Objective
Statements at
CMT/SMT 15/8/22
SMART Objective  Indicators  Current Position
by better use of
assets  • Seek opportunities
to utilise other
Council building
assets to increase
efficient use and
reduce carbon
footprint 
• Reduce
unnecessary travel
to and for work
Reduce Council estate by 3
offices by end of 2024 
Reduce the office estate by 5
offices by 2025 
Achieve 50% space allocation of
FTE total with services in HQ
campus by August 2023 
Increase the number of staff
utilising the Moray Council HQ
campus office accommodation
by 25% by April 2025 
Reduce the mileage claimed for
private car usage by 10% by end
of financial year 2024/25
Total number of office
bases 
Desk allocation compared
to 50% FTE for services
based in HQ campus 
Number of staff utilising
HQ campus 
Total Mileage claimed
(baseline 2022/23)
9NGS, Southfield and
Cluny Square Buckie
will be released by April
2024 
58% has been achieved
and is currently
considered realistic
given adjustments for
individual circumstances
and requirements for
service delivery. 
Will go from 895 to from
1000 when Southfield
staff move in (15%) 
To be measured after
year end 2024/25 
Page 108

Page 109

REPORT TO:   MORAY COUNCIL ON 6 DECEMBER 2023 
SUBJECT:   MONITORING OFFICER REPORT FROM 1 NOVEMBER 2022 TO
31 OCTOBER 2023 
BY:   MONITORING OFFICER 
1. REASON FOR REPORT 
1.1 To inform the Council on the range of activities undertaken by the Monitoring
Officer. 
1.2 This report is submitted to Council in terms of Section III A (4) of the Council's
Scheme of Administration relating to public performance reporting. 
2. RECOMMENDATION 
2.1 It is recommended that the Council consider and note the contents of
this report. 
3. BACKGROUND 
3.1 There is a statutory requirement for every Council to appoint a Monitoring
Officer. The Head of Governance, Strategy and Performance performs this
role in Moray Council supported by the Legal Services Manager who acts as
Depute Monitoring Officer. 
3.2 Legislation requires the Monitoring Officer to bring to the attention of the
Council:
• A contravention of law or any code of practice made or approved under
any enactment; or
• Maladministration or injustice in each case actual or potential and
whether by the Council, committees, sub-committees or officers. 
3.3 The position adopted by the Monitoring Officer is that a breach would require
to be material, or a significant breach of the law in terms of the operations or
finances of the Council to cause the Monitoring Officer to issue a report to the
Council. 
3.4 It is normal practice within local authorities for the Monitoring Officer to:
• Promote good governance and sound decision making. 
• Promote the Councillors Code of Conduct. 
Item 12.
Page 109

Page 110

3.5 The Council’s Policy and Resources Committee on 2 October 2012 agreed
that the Monitoring Officer would present an annual report on the activities of
the post (para 8 of the minute refers). 
4. SUMMARY OF WORK UNDERTAKEN BY THE MONITORING OFFICER: 
Statutory role
4.1 There have been no formal reports by the Monitoring Officer of legal
contravention or maladministration as described in paragraph 2.2. 
The Council have a number of systems and processes in place to deal with
breaches or non-compliance with legislation/policy at a lower level. 
Governance role
4.2 During the period covered by the report the Monitoring Officer has: 
4.3 Helped commission external assistance to improve collaborative leadership of
Councillors and Officers to help the Council make progress with its strategic
agenda and priorities. The results of this work were considered by the
Council’s Corporate Committee on 4 October 2023. 
4.4 Helped ensure continued flexibility for Council/Committee meetings with the
option of hybrid meetings. 
4.5 Signed off agendas, reports and notices of motion submitted for all formal
meetings of the Council and its Committees/Sub-Committees with assistance
from the Legal Services Manager (Depute Monitoring Officer), Committee
team and Legal team. 
• This is a significant element of the Monitoring Officer’s workload, often
undertaken over a very restricted period to enable Committee Agendas to
be published within the statutory timescales. 
• Given increasing and competing demands on the roles of the Monitoring
Officer/Depute, and staffing gaps within Legal Services, a lighter touch is
now being given to the report review process with time spent being relative
to the risk. 
• Due to workload pressures in other areas reports are often received late
which puts additional pressure on the agenda preparation process.   
4.6 The combined effect of these issues creates an increased risk that procedural
problems arise at committee which could have been resolved at an earlier
stage. 
4.7 Introduced guidance on Notices of Motion in response to an increasing
amount of time being taken dealing with Notices of Motion in the Committee
process. Whilst Notices of Motion are an important part of the democratic
process, they can put additional demands on limited officer resources and
require re-prioritisation of Council priorities. Further training planned on this at
the time of writing. 
4.8 Delivered training for committee chairs and facilitated training on scrutiny. 
Page 110

Page 111

4.9 Advised all Councillors - administration and non-administration- on practical
application of the Council’s Constitutional Documents to the committee
system, including advice on notices of motion, competency of motions, written
questions, political balance and suspension of Standing Orders. 
4.10 Progressed with a review of the Council’s second tier Governance
arrangements in line with the Council’s Improvement and Modernisation
Programme.  This involved a review of the Council’s meeting structures to
help ensure that they meet the needs of the organisation. More recently a
review of senior Councillor roles has been undertaken and a Councillors
Roles and Responsibilities document agreed.   
4.11 Through the legal services section, helped manage the Council’s legal risk
through: 
• Dealing with claims in courts and tribunals.
• Advice, statutory processes and transactional work.
• Promote awareness of and compliance with major pieces of new
legislation.   
4.12 Given staffing gaps with the legal services section (largely due to recruitment
issues), and despite prioritisation and increased outsourcing of legal work, it is
becoming increasingly challenging to ensure that the Council receives
appropriate and timely legal advice.  This creates a significant legal risk to the
Council which could manifest itself through service or process failure, leading
to financial or reputational damage.   
Code of Conduct Role
4.13 During the period covered by the report the Monitoring Officer has: 
4.14 Maintained the register of councillors’ interests including six monthly
reminders and council tax payment checks prior to budget setting. Councillors
are reminded that any changes must be notified within one month of them
occurring. 
4.15  Provided regular updates to Councillors in relation to Standards Commission
briefings and relevant hearings. Further training opportunities will cover the
issues raised in the following paragraphs. 
4.16 Given advice to councillors on individual circumstances including:
• the requirement to declare an interest
• registration of interests
• the revised rules on accepting gifts and hospitality. This area has
caused some practical difficulties which have been raised at a national
level to see if further clarity can be given. 
4.17 Dealt with complaints against Councillors in terms of the Council’s policy, and
informally mediated in situations of conflict between Councillors. These have
involved the following provisions of the Code: 
• showing respect for other Councillors
Page 111

Page 112

• language used in social media, an area of increasing tension and
conflict between councillors. 
• allegations of bullying and harassment 
4.18 This intervention can be time consuming and, where there is no element of
contrition from those complained about, often has limited success with the
complainer being signposted to the complaints process of the Commissioner
for Ethical Standards. 
4.19 Communicated with the Ethical Standards Commissioner and the Standards
Commissioner over complaints covering registration and declaration of
interest. 
4.20 Participated with other Monitoring Officers in workshops with the Standards
Commission over issues potential amendments to the Code of Conduct. 
4.21 Maintained close links with other Monitoring Officers to act as a sounding
board for tricky and complex issues. 
5. SUMMARY OF IMPLICATIONS 
(a)  Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Effective governance is required for the delivery of the Council’s stated
priorities and plans. 
(b) Policy and Legal
These are detailed more fully in the report. 
(c) Financial Implications  
None. 
(d) Risks implications 
Actions taken by the Monitoring Officer help to manage political and
regulatory risks within the Corporate Risk Register. 
(e) Staffing implications
The role is carried out by the Head of Governance Strategy and
Performance, supported by the Legal Services Manager. It can be
challenging to fulfil the role alongside competing workload priorities. 
(f) Property Implications  
None
(g) Equalities/Socio Economic Impact 
There are no issues arising directly from this report. 
(h)  Climate Change and Biodiversity Impacts 
None 
(i) Consultations
The Depute Monitoring Officer has been consulted and her comments
have been reflected in the report.
Page 112

Page 113

6 CONCLUSION 
6.1 The report informs the Council on the activities undertaken by the
Monitoring Officer during the period covered by this report. 
Author of Report:  Alasdair McEachan, Head of Governance, Strategy and
Performance (Monitoring Officer) 
Background Papers: None
Ref:     
Page 113

Page 114

Page 114

Page 115

REPORT TO: MORAY COUNCIL ON 6 DECEMBER 2023 
SUBJECT: REVIEW OF OUTSIDE BODY APPOINTMENTS 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform the Council of vacancies which have arisen due to the resignation of
several Councillors from Outside Body appointments and agree appointments
to the vacancies where it is deemed necessary. 
1.2 This report is submitted to Committee in terms of Section II (12) of the
Council's Scheme of Administration relating to the appointments to outside
bodies. 
2. RECOMMENDATION 
2.1 It is recommended that the Council consider and agree: 
i) to make an appointment to the North East Scotland Pension Fund
following the resignation of Councillor Leadbitter; 
ii) to appointment a new Equalities Champion; and 
iii) whether to appoint a Joint Older Person’s Champion. 
3. BACKGROUND 
3.1 At the meeting of Moray Council on 29 June 2022, Councillor Leadbitter was
appointed as the Council representative on the North East Scotland Pension
Fund (para 38 of the minute refers). 
3.2 Councillor Leadbitter has intimated that he will be resigning from the North
East Scotland Pension Fund from Tuesday 19 December 2023 following the
next meeting. 
3.3 Following resignations from the current Equalities Champion and Joint Older
Person’s Champion, a decision is required on whether to appoint
replacements to these Council positions. 
Item 13.
Page 115

Page 116

4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
None 
(b) Policy and Legal
None 
(c) Financial implications
None 
(d) Risk Implications
None 
(e) Staffing Implications
None 
(f) Property
None 
(g) Equalities/Socio Economic Impact
None 
(h) Climate Change and Biodiversity Impacts
None 
(i) Consultations
The Depute Chief Executive (Education, Communities and
Organisational Development) and Head of Governance, Strategy and
Performance were consulted and are in agreement with the terms of the
report. 
5. CONCLUSION 
5.1 The Council is asked to consider appointing representatives to the
vacancies created from resignations from current appointees. 
Author of Report: Tracey Sutherland, Democratic Services Manager
Background Papers: 
Ref: 
Page 116

Page 117

REPORT TO: MORAY COUNCIL ON 6 DECEMBER 2023 
SUBJECT: PETITIONS PROCEDURE – UNDER 18 YEAR OLDS 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To ask the Council to agree the inclusion of an addendum to the Petitions
Guidance/Procedure to allow young people up to the age of 18 to make
representations to the Council. 
1.2 This report is submitted to Council in terms of Section II (10) of the Council's
Scheme of Administration relating to changes in Committee structure,
distribution of functions and responsibilities. 
2. RECOMMENDATION 
2.1 It is recommended that the Council agree the inclusion of an addendum
to the current Petitions Guidance/Procedure that will allow young people
up to 18 years of age to make representation to the Council. 
3. BACKGROUND 
3.1 At the meeting of Moray Council on 7 December 2022, the Council agreed to
introduce an e-petition process and that a further report be brought forward on
how the petitions process could best facilitate representation from young
people up to the age of 18 years (para 22 of the Minute refers). 
4. ENGAGING WITH YOUNG PEOPLE UP TO THE AGE OF 18 
4.1 As previously discussed at the meeting of Council on 7 December 2022 (para
22 of minute refers), it is considered that the criteria set out within the
Council’s petitions process would be problematic in terms of gaining a fixed
number of signatories who were required to be on the electoral register,
therefore, in order to make it as accessible as possible, a much simpler
process was required. 
4.2 A draft proposed procedure is attached at Appendix 1. The procedure
broadly aligns to the Council’s petition process however has been amended to
use plain English language, explains what can and cannot be raised and also
details accepted counter-signatories. A pro forma is attached at Appendix 2
Item 14.
Page 117

Page 118

to assist young people and ensure they provide the information required to
progress the petition. 
4.3 It is proposed that any petitions from young people up to the age of 18 are
administered by Committee Services and then passed to the Head of Service
for a decision on how the issue should be addressed, in conjunction with the
Chair of the relevant Service Committee. 
4.4 Should the Council be minded to approve this procedure it will be added as an
addendum to the Council’s Petition process/guidance on the relevant
webpage. 
4.5 A limited number of young people have been consulted on the draft procedure
via the Community Learning and Development (CLD) Worker from which
positive feedback has been provided. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
Members of the public engaging with the Council by means of petitions
links directly with Moray Council’s priority to Empower Communities. 
(b) Policy and Legal
It is important, in the interests of good corporate governance and the
Best Value Statutory Duty, for the Council to provide a means for the
public to engage in the decision making process. 
Article 12 of the United Nations Convention on the Rights of the Child
and its upcoming enshrinement into Scottish Law via the United Nations
Convention on the Rights of the Child (Incorporation) (Scotland) Bill
outlines that children have the right to express a view and have that view
taken into account. 
(c) Financial Implications
None 
(d) Risk Implications
The Council could be seen to be excluding young people from being able
engage with the Council on matters for which the Council has a
responsibility or a service it provides relative to them. 
(e) Staffing Implications
None. 
(f) Property
None. 
(g) Equalities/Socio Economic Impact
The proposals are consistent with the UNCRC (Incorporation) (Scotland)
Bill. 
(h) Climate Change and Biodiversity Impacts
Page 118

Page 119

None. 
(i) Consultations
Depute Chief Executive (Education, Communities and Organisational
Development), Head of Governance, Strategy and Performance, Head of
Education, Democratic Services Manager, Susan Stronach, CLD
Worker, Stewart McLauchlan, Quality Improvement Manager, Dr L
Puhalak, Policy Officer,Ms L Van Zyl, Service Manager, both Health and
Social Care Moray and the Equalities Officer. 
6. CONCLUSION 
6.1 It is recognised that the current Petitions Procedure does not provide a
means by which young people up to the age of 18 can engage with the
Council on matters of importance.  The proposed addendum to the
current Petitions Procedure will allow engagement from young people in
a structured, yet simplified manner. 
Author of Report:  Caroline O’Connor, Committee Services Officer 
Background Papers:  
Ref:    
Page 119

Page 120

Page 120

Page 121

APPENDIX 1 
How to submit a petition – A guide for young people up to 18 years
(Addendum to the Petitions Procedure) 
If you are a group under 18 years of age who wish to raise an issue with the Council
there are several ways you can do this: 
• Email  - committee.services@moray.gov.uk
• Post    - Committee Services,                       
Moray Council, Council Office, High Street, Elgin, IV30 1BX
• Contact Your Local Councillor  
Simply write down the issue you wish to raise making sure that you provide enough
information to allow the Council to understand the background to your issue and
what, if anything, you would like the Council to do about it.  Please use no more than
250 words. This process is called raising a Petition.  You need to get at least 20
members or more of your group/class who agree with your petition to put their name
to it and then you should ask an adult, either a Head/Depute/Guidance Teacher or
Group Leader (for example a scout or club leader) to countersign your petition to
confirm that the lead Petitioner and those who have signed the petition attend the
school or are members of the Group in Moray.   
A template petitions form is attached for your use. 
About the petition topic 
The Council can only consider issues that it has responsibility for or relates to
something the Council does or a service it provides.  
You should not name any individual, including people who work for the Council, any
of their family members, other people outside the Council or include information that
may easily identify people.  Petitions cannot be accepted where the topic relates to a
particular individual’s case being dealt with by the Council or issues that are covered
by legal processes, eg planning or licensing applications.  It could be that our
Complaints Procedure can be used for an individual concern.
Submitting your Petition 
Please make sure that you include all the information you want the Council to
consider with the petition. It is recommended that you keep a copy of the petition
as, if it goes missing, the Council cannot accept responsibility for items lost or
delayed in the post. 
You will receive a letter or email from Committee Services saying that your petition
has been received within 14 days. 
It will then be processed by Committee Services who will forward it to the relevant
Head of Service (council manager) and after that you will be contacted by that
Service who will advise you of what will happen next.
Item 14.
Page 121

Page 122

Page 122

Page 123

APPENDIX 2
PETITION SUBMISSION FORM (YOUNG PEOPLE) 
If you wish to submit a petition for consideration by Moray Council, please complete this form. For
guidance, further information or advice on the submission of a petition please contact the
Democratic Services Manager on 01343 563014 or email committee.services@moray.gov.uk, or
alternatively refer to information on www.moray.gov.uk/petitions
Lead Person’s (Petitioner) contact details
Please enter the name of person raising the issue/petition.
Include a contact address to which correspondence may be sent, a contact telephone number and
e-mail address if available so that we can contact you with any queries.
Name:
Address: 
Postcode:
Tel No:
E mail:
Title/subject of issue – please provide a summary of what the issue is in a few words
Office use: Petition number
Item 14.
Page 123

Page 124

Action sought - please state what action you would like the Council to take. 
Action to date - please detail any action taken by the lead person/others (if any) to
resolve the issues before submitting the petition. 
Background Information - please provide any other background information that you
think the Council should be made aware of. 
Page 124

Page 125

Signature of Lead Person (Petitioner)
The Lead Person should sign and date the form in the box below.
Any additional sheets of signatures should be attached to the form. 
Signature ………………………………………………………. Date ……………………………….
Name of signatory in block capitals ……………………………………………………………….
Counter Signature
A Head Teacher/Depute Head Teacher/Guidance Teacher or Group Leader should
countersign and date the form in the box below to confirm all who have signed the petition live
in Moray  
Signature ………………………………………………………. Date ………………………………. 
Name of signatory in block capitals ……………………………………………………………….
Job Title  ………………………………………………………………………………………………..
Number of people who have
signed the petition 
Page 125

Page 126

PETITION FORM APPENDIX 
NAME SCHOOL/GROUP ADDRESS SIGNATURE
1.  
2.  
3.  
4.  
5.  
6.  
7.  
8.  
9.  
10.  
11.  
12.  
13.  
14.  
15.  
16.  
17.  
18.  
19.  
20.  
*Add additional sheets if required
The petition must be supported by 20 signatures or more of young people living in the Moray
Council area 
Page 126

Page 127

REPORT TO: MORAY COUNCIL ON 6 DECEMBER 2023 
SUBJECT: INFORMATION REPORT: 2023 REVIEW OF UK PARLIAMENT
CONSTITUENCIES – REVISION OF POLLING DISTRICTS 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform Council of the revision of Ward 2, 3 and 4 polling district prefixes in
light of the agreed 2023 Boundary Commission review of UK Parliament
Constituencies. 
1.2 This report is submitted to Council in terms of Section II (9) of the Council's
Scheme of Administration relating to all election matters. 
2. BACKGROUND 
2.1 Section 18(3) of the Representation of the People Act 1983 requires each
Local Authority in Scotland to designate a polling place for each of its polling
districts and to review these within 16 months of 1 October 2013 and every 5
years thereafter.  The next Polling Station Review is due to commence on 1
October 2023 and be complete by 31 January 2025. 
2.2 On 27 June 2023, the Boundary Commission lodged its final proposals for the
changes to Boundaries in relation to UK Parliament Elections with the
Speaker of the House of Commons.   
2.3 The Government subsequently submitted the new UK Parliament constituency
boundaries recommendations to the Privy Council before the end of October.  
At the Privy Council meeting on 15 November, His Majesty The King made
the Order in Council - the Parliamentary Constituencies Order 2023 (SI
2023/1230) - to implement the recommendations in the reports across the
UK. The Order will come into force on 29 November 2023 and the new
parliamentary constituencies will take effect at the next UK Parliamentary
General Election called after this date.  Until then, any parliamentary by-
elections will be run on existing boundaries.  
2.3 The new boundaries see the existing Moray Constituency being split into two
new constituencies, namely, Aberdeenshire North and Moray East and Moray
West, Nairn and Strathspey. 
Page 127

Page 128

Aberdeenshire North and Moray East Constituency
2.4 The Aberdeenshire North and Moray East Constituency will include Wards 2,
3 and part of Ward 4, east of the River Spey in Moray along with
Aberdeenshire Council Wards 1, 2, 3, part of Ward 4, 5 and 6. 
Moray West, Nairn and Strathspey Constintuency
2.5 The Moray West, Nairn and Strathspey will include Moray Wards 1, part of
Ward 4 west of the River Spey, 5, 6, 7 and 8 and include part of Ward 17 and
all of Wards 18 and 20 from Highland Council. 
2.6 In preparation for the changes, Local Authorities have been advised, where
electoral areas are being split by the new proposed constituencies, the
affected Polling Districts are constructed in such a way that the prefixes reflect
the current and new proposed Boundaries. 
2.7 Currently the Council use the following prefixes to identify the existing 
constituencies: 
M Scottish Parliament Constituency
- Moray 
M UK Parliament Constituency
- Moray
B Scottish Parliament Constituency
– Banffshire and Buchan Coast
M UK Parliament Constituency
- Moray 
2.8 In order to prepare for the UK Parliament boundary changes some Polling
Districts in Wards 2, 3 and  4 moving to the new proposed Aberdeenshire
North and Moray East Constituency will need to have the prefixes amended
as follows: 
M Scottish Parliament Constituency
- Moray
M UK Parliament Constituency
– Moray West, Nairn and
Strathspey 
M Scottish Parliament Constituency
– Moray
A UK Parliament Constituency
– Aberdeenshire North and
Moray East
B Scottish Parliament Constituency
– Banffshire and Buchan Coast
A UK Parliament Constituency
- Aberdeenshire North and
Moray East 
2.6 Moray and Aberdeenshire Council’s share the same ward numbers in the new
proposed Aberdeenshire North and Moray East Constituency, so to
differentiate, any of polling districts with the BA prefix which are the same will
have either an M (Moray) or an A (Aberdeenshire) at the end to denote the
local authority. 
2.7 No changes are required to the Wards included in the new Moray West, Nairn
and Strathspey Constituency.  
Page 128

Page 129

3. PROPOSALS 
3.1  The full detail of the amendments to polling districts are detailed below;     
Ward 2 – Keith and Cullen
Current  Polling District  New
BM0201 Portknockie BA0201M
BM0202 Cullen and Rathven Rural BA0202M
BM0203 Deskford BA0203M
MM0204 Newmill MA0204
BM0205 Grange BA0205M
MM0206 Fife Keith MA0206
MM0207 Keith and District MA0207
BM0208 Rothiemay BA0208M   
Ward 3 – Buckie
Current  Polling Station New
BM0301 Buckpool - Arradoul BA0301M
MM0302 Westerton - Arradoul MA0302
BM0303 Buckie West BA0303M
BM0304 Buckie East BA0304M
BM0305 Buckie South BA0305M
BM0306 Portessie BA0306
BM0307 Findochty BA0307   
Ward 4 - Fochabers Lhanbryde 
Current  Polling District New
MM0401 Lhanbryde and Pitgaveny No Change
MM0402 Urquhart No Change
MM0403 Garmouth and Kingston No Change
MM0404 Speybay MA0404
MM0405 Portgordon MA0405
MM0406 Fogwatt No Change
MM0407 Mosstodloch No Change
MM0408 Fochabers MA0408
MM0409 Clochan MA0409 
3.3 As there are no proposed changes to the locations of the Polling Stations
within the Polling Districts at this time, no consultation was required.  
Page 129

Page 130

4. IMPLEMENTATION OF PROPOSED AMENDMENTS 
4.1 The amendments detailed in section 3, will come into force at the next
General Election, to be called no later than January 2025.  If a Westminster
By Election is required prior to the next General Election it will be run based
on the current UK Parliamentary Boundaries. The Returning Officer is
therefore making plans to run elections using either of the boundaries. 
4.2 The Elections Team have been working with the Electoral Registration Officer
to be able to produce Electoral Registers on 1 December 2023 for both the
‘old’ and ‘new’ boundaries. 
4.3 Following the completion of the statutory Polling Place Review a further report
will be presented to the Council early in 2024. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
There are no implications for these plans arising from these proposals. 
(b) Policy and Legal 
Section 18(3) of the Representation of the People Act 1983 requires
each Local Authority in Scotland to designate a polling place for each of
its polling districts and to keep these under review. 
(c) Financial implications
None arising from this report. 
(d) Risk Implications
A polling place review must be completed and agreed by the end of
January 2025. 
(e) Staffing Implications
None arising from this report. 
(f) Property
None arising from this report. 
(g) Equalities/Socio Economic Impact
None arising from this report. 
(h) Consultations
Depute Chief Executive (Education, Communities and Organisational
Development) and the Head of Governance, Strategy and Performance. 
5. CONCLUSION 
5.1  Following a review of current polling district arrangements, taking into
account the proposed UK Parliamentary Constituency Boundary
changes current laid before Parliament amendments have been made to
Page 130

Page 131

the polling district prefixes in Wards 2, 3 and 4 affected by the proposed
changes. 
Author of Report: Tracey Sutherland, Democratic Services Manager
Background Papers: 
Ref: 
Page 131

Page 132

Page 132