Democracy Spraffa

Supplementary Agenda Document Pack - Moray Council - 25/09/2024

Moray Council · 25 September 2024
Back to Moray Council — 25 September 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Moray Council 
Wednesday, 25 September 2024 
SUPPLEMENTARY AGENDA 
The undernoted reports have been added to the Agenda for the meeting of the
Moray Council to be held at Council Chambers, Council Office, High Street,
Elgin, IV30 1BX on Wednesday, 25 September 2024 at 09:30. 
BUSINESS 
3a. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media
representatives be excluded from the meeting for Items 18 - 20 of
business on the grounds that it involves the likely disclosure of
exempt information of the class described in the relevant Paragraphs
of Part 1 of Schedule 7A of the Act.”   
12a. Appointment of Chair and Depute Chair for Audit and
Scrutiny Committee
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
3 - 4
15a. Early Years STEM Full Business Case
Report by the Depute Chief Executive (Education, Communities and
Organisational Development)  
5 - 154 
Page 1

Page 2

18. Revised Redundancy Policy [Para 1]
• 1. Information relating to staffing matters; 
19. Senior Management Recruitment Update [Para 1]
• 1. Information relating to staffing matters; 
20. Consultancy Support For Review Of Council Corporate
Management Structure [Para 8 and 9]
• 8 & 9. Information on proposed terms and/or expenditure to be
incurred by the Authority; 
Page 2

Page 3

REPORT TO: MORAY COUNCIL ON 25 SEPTEMBER 2024 
SUBJECT: APPOINTMENT OF CHAIR AND DEPUTE CHAIR OF AUDIT AND
SCRUTINY COMMITTEE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To invite the Council to appoint a new Chair and Depute Chair of Audit and
Scrutiny Committee. 
1.2 This report is submitted to Council in terms of Sections I, II and III of the
Council's Scheme of Administration relating to the establishment of a
committee structure, the appointment to committees, the appointment of Chair
and Depute Chair thereof and the delegation of functions to committees 
2. RECOMMENDATION 
2.1 It is recommended that the Council considers and agrees to appoint a
new Chair and Depute Chair for Audit and Scrutiny Committee following
the resignation of Councillor Leadbitter. 
3. BACKGROUND 
3.1 At its meeting on 18 May 2022, the Council agreed to appoint Councillors
Leadbitter and Morrison as Chair and Depute Chair of Audit and Scrutiny
Committee (para 3 of the minute refers) following agreement that the positions
be taken up by non-members of the Administration. 
3.2 Following the General Election on 4 July 2024, Graham Leadbitter resigned
as a Councillor of Moray Council on 14 August 2024.  Until this date he had
been chair of Audit and Scrutiny Commmittee. 
4. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP))
None arising from this report. 
(b) Policy and Legal
The proposals set out in this report comply with Sections (I) (II) & (III) of
Item 12a.
Page 3

Page 4

the Council’s Scheme of Administration relating to the delegation of
functions to Committees and Sub-Committees, the appointments of
Members to these and the appointment of Chair & Depute Chairs. 
(c) Financial implications
None arising from this report 
(d) Risk Implications
None arising from this report. 
(e) Staffing Implications
None arising from this report. 
(f) Property
None arising from this report. 
(g) Equalities/Socio Economic Impact
None arising from this report. 
(h) Climate Change and Biodiversity Impacts
None arising from this report. 
(i) Consultations
The Interim Chief Executive, Depute Chief Executive (Education,
Communities and Organisational Development), Depute Chief Executive
(Economy, Environment and Finance) and Head of Governance,
Strategy and Performance have been consulted and any comments
incorporated into the report. 
5. CONCLUSION 
5.1 Council is asked to consider and agree the Chair and Depute Chair of
Audit and Scrutiny Committee. 
Author of Report: Tracey Sutherland, Democratic Services Manager
Background Papers: 
Ref: 
Page 4

Page 5

REPORT TO: MORAY COUNCIL ON 25 SEPTEMBER 2024 
SUBJECT: MORAY GROWTH DEAL – EARLY YEARS SCIENCE,
TECHNOLOGY, ENGINEERING AND MATHEMATICS PROJECT
FULL BUSINESS CASE 
BY:  DEPUTE CHIEF EXECUTIVE (EDUCATION, COMMUNITIES AND
ORGANISATIONAL DEVELOPMENT) 
1. REASON FOR REPORT 
1.1 To inform Council of progress made by the Moray Growth Deal (MGD) to
prepare a full business case for the Early Years Science, Technology,
Engineering and Mathematics (EY STEM) project and seek delegated
authority to enable final approval of the business case enabling the project to
move into delivery. 
1.2 This report is submitted to Council in terms of Section (II) (20) of the Council’s
Scheme of Administration relating to a new policy matter which does not fall
within the terms of reference of any Committee. 
2. RECOMMENDATION 
2.1 It is recommended that the Council: 
(i) considers and approves the Full Business Case (FBC)
summarised in this report and contained in Appendix 1; 
(ii) delegates authority to the Depute Chief Executive (Education,
Communities and Organisational Development) to make any final
changes as required following completion of the Government
review process, with a view to agreeing a final version of the FBC
to progress to implementation; and 
(iii) delegates authority to the Depute Chief Executive (Economy,
Environment and Finance) or other such signatory as may be
required to accept the Government grants for the projects in line
with the terms of the MGD 
Item 15a.
Page 5

Page 6

3. BACKGROUND 
3.1 On 30 November 2021 Council approved full deal documentation for the MGD
that included a full business case for the Digital Health project and outline
business cases for the remaining 7 projects (para 9 of the minute refers).   
3.2 Since then the EY STEM project has been working to prepare it’s FBC,
ensuring proposals operate within the revenue and capital envelope set at
OBC stage.  A project briefing was held for members in March 2023 that
focused on how the project team had developed an operational model in line
with the aspirations of the preferred option at OBC stage but that was
financially viable.  Alongside this, updates on progress were included in the
Deal’s annual reports.  The 2021/22 annual report was presented to Council
on 8 March 2023 (para 13 of the minute refers) and the 2023 annual report
was submitted for approval at the Council meeting on 6 March 2024 (para 14
of the minute refers). 
3.3 This report summarises and presents the EY STEM FBC which will incur
costs of £4.8m capital (£3.5m from the Scottish Government and £1.3m from
the Moray Council) and £1.6m revenue (Moray Council).  Details of when the
Council’s capital and revenue contributions will be profiled during the life of
the project are outlined in section 6(c).   
3.4 The submission of this document to the Moray Council is part of an extensive
assurance process that is outlined below. 
Project Pre-
submission
workshop
with the
Governments
Project
Board
approval
MGD
Programme
Board
approval
Transforming
Learning
Board 
Moray
Economic
Partnership
EY
STEM
8 March 2024 5 March
2024
28 March
2024
31 May 2024 Late Q2,
early Q4
24/25 
3.5 Government clearance of the FBC is expected mid to late Q2 24/25 and this,
coupled with approval by the Council and the Community Planning Board on
23 October 2024, will enable the project to enter delivery in early Q3 24/25 FY.   
4. CURRENT STATUS OF THE EY STEM PROJECT FBC 
4.1 The Government review process for the business case has commenced and
the draft appended to this paper (Appendix 1) incorporates feedback
provided from the first cycle of comments received from Policy Advisors.   
4.2 Whilst it is likely further comments will be received from Policy Advisors before
the Government review concludes, it is not expected at this stage that they will
result in material changes to the FBC.  To account for these changes,
delegated authority is sought to make final adjustments to the final version of
the document.  Delegated authority is similarly sought to accept grant for the
project in line with terms agreed previously. 
Page 6

Page 7

5. OVERVIEW OF EY STEM FBC ISSUE 3 (APPENDIX 1) 
Summary of the project 
5.1 Early Years STEM aims to encourage young people to enter a STEM related
career when they leave education and focuses on STEM engagement with
children in their early stages of learning (age 3-8).  The project develops a
STEM learning ecosystem in the Moray area, through the creation of
specialist learning environments and experiences, access to training and
resources and the creation of a STEM learning network involving key delivery
partners, upskilled staff, volunteers from industry and the wider community.   
5.2 The project will invest in state of the art facilities in community settings
throughout Moray, each offering a unique experience that can be delivered
flexibly across the region, including mobile and outreach offerings.  These
hubs will aim to inspire and enhance the STEM learning experience of
children and staff through age appropriate, curriculum aligned and industry
related STEM experiences.  It will also offer accessibility to parents,
employers and the wider community, thereby allowing inter-generational
learning to take place   
5.3 Capital totalling £4.8 million will be required to deliver the facilities: 
Funding partner Capital contribution
Scottish Government £3,500,000
UK Government £1,300,000
TOTAL £4,800,000 
5.4 The project will also be supported by revenue funding of £1.6 million from
Moray Council to support STEM specific roles and the embedding of the
services as the project moves into delivery.   
Investment objectives to be achieved 
1 To increase the availability of STEM opportunities for younger people, through
the creation of experiential STEM learning hubs delivering upwards of 9000
engagements per annum by 2032
2 To increase participation and attainment in STEM subjects at secondary level
by 8%, thereby encouraging uptake at further and higher education and
ultimately increasing the STEM skills level in Moray by 2042.
3 To ensure there is equality of opportunity in STEM education across Moray,
ensuring all students aged 3-8 are engaged with the curriculum at least once
per annum no matter their location, and increasing female participation in
STEM subjects at secondary level by 10% by 2042.
4 To increase the skills level of early year’s practitioners and primary teachers in
the delivery of STEM disciplines, with an increase of 32 STEM champions in
settings by 2032.
5 To strengthen science capital within communities through the provision of at
least 10 public STEM engagement events per annum, thereby encouraging
parental engagement, inter-generational learning, and raising the awareness
of STEM related careers by 2032. 
Page 7

Page 8

6 To develop new forms of delivery through multi-agency collaboration and inter-
disciplinary working, engaging 400 students aged 3-12 in partner led
programmes and events, and increasing the number of industry and
community STEM Ambassadors in Moray by 50% by 2032. 
What will this project mean for Moray?
5.5 The project will deliver a number of facilities and assets for the region,
namely:   
- A network of state of the art STEM facilities in community settings across
Moray.  The first will be in Moray’s central public library in Elgin (Cooper
Park) and 2 further satellite sites will be developed in Forres and Buckie. 
- A mobile facility will be procured, with this being used to reduce rurality as
a barrier to participation in STEM activity.  
- An environmental sciences and outdoor STEM learning centre will be
developed and delivered in conjunction with a local environmental charity,
the preferred location identified is at Milbuies Country Park.  
- An outreach offering, consisting of a central repository of STEM
resources.
- A comprehensive learning programme aligned to Scotland’s Curriculum
for Excellence that offers progression from early years through to broad
general education.
- A STEM Grant Scheme using ring fenced Moray Growth Deal funding to
support partnership activity and community focused STEM programmes
and events.
- A dedicated team of STEM Coordinators to manage activity across all
elements of the project, including outreach, STEM delivery at the centres,
and co-ordination of partner activity. 
Overview of options considered and the preferred approach
5.6 Five options were considered for the project:   
Option Description
1 Do nothing, business as usual:  No Growth Deal funding to be used,
current way of working continues. 
2 Minimum:  A hub provision in each ELC and primary setting, a mobile
offering and partnership activity
3 Intermediate:  One central provision, a mobile and outreach offering and
partnership activity.
4 Intermediate:  Provision in targeted locations across Moray, a mobile
and outreach offering and partnership activity.
5 Maximum:  Provision in each ASG in Moray, a mobile offering and
partnership activity. 
5.7 As the business case progressed to Full Business Case (FBC) stage, three
short-listed options were carried forward: Option 2, Option 3, and Option 4. 
5.8 Option 1 was discounted (but presented as the “Business as Usual” status
quo option as a baseline comparator) as it presented little evidence of impact,
and the demand for Option 5 has been tested in engagement with education
Page 8

Page 9

staff who indicated limited utilisation of fixed facilities in rural areas (with a
preference for flexible mobile solutions). 
Theme  Option 2 Option 3 Option 4
Raw (R) and weighted
(W) scores
R W R W R W
Productivity  3 0.15 7 0.35 8 0.4
People 12 1 20 1.65 30 2.35
Population 1 0.05 2 0.1 4 0.2
Place 1 0.05 12 0.6 14 0.7
Fairer Scotland Duty 3 0.3 8 0.6 10 0.75
Total Score 20 1.55 49 3.3 66 4.4
Weighted (%) 31% 66% 88% 
5.9 Option 4 was identified as the preferred option.  It offers the ability to deliver
against the stated investment objectives and contribute to the realisation of
economic and wider qualitative benefits.   
Key headlines from the business case
5.10 The benefit cost ratio (BCR) at a UK level for the preferred option (number 4)
is 5.8, which compares to 5.2 for option 2 and 4.9 for option 3.   
5.11 The first STEM hub (in Elgin Library) is expected to be operational in Autumn
2025, with the satellite hubs in Forres and Buckie to be developed in
subsequent phases of activity 
5.12 As the project prepares to enter delivery, the key grouping of risks being
managed by the project team relate to service implementation.  Specifically:   
Lack of employer, partner, and
community engagement
- Consultation with Community Planning
Partnership and cross sharing of
resources for engagement 
- Utilise partner connections
- Early understanding of market needs
Failure to develop scope that meets
objectives
- Early understanding of needs
- Communications and engagement 
- Project planning with key stakeholders
- Ensure the project board involves key
stakeholders
Project fails to deliver core benefits - Stakeholders have strong reputation
- Project planning and risk
management/operationalisation 
- Ongoing communications and
partnership-working
Failure to recruit the staff with the right
mix of skills
- Robust recruitment process 
Page 9

Page 10

6 SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)
The MGD projects contribute to the Corporate Plan priority of promoting
economic development and growth, whilst meeting the LOIP vision of
raising aspirations, reducing inequalities in educational attainment,
providing access to employment, expanding choices for residents, and
improving livelihood and well-being.   
(b) Policy and Legal
Each MGD project has been developed to meet local, regional and
national policy agendas in line with legal requirements where relevant.   
(c) Financial implications
This project is funded through the Growth Deal and led by the Moray
Council.  The Scottish Government is contributing £3.5m, with the Moray
Council £1.3m in capital and £1.6m in revenue.   
Year Capital Revenue
22/23 £0 £53,595
23/24 £66,493 £71,338
24/25 £338,445 £56,724
25/26 £249,162 £124,889
26/27 £217,490 £128,635
27/28 £148,180 £142.875
28/29 £131,450 £157,854
29/30 £48,000 £162,590
30/31 £45,000 £167,590
31/32 £52,780 £172,666
32/33 £0 £177,666
33/24 £0 £182,996
TOTAL £1,300,000 £1,599,121   
(d) Risk Implications
The risks associated with these projects are captured in the FBC and
there are robust risk management processes embedded within both
project and programme governance arrangements. 
Below is an extract from the ‘Strategic risks’ section of the FBC (2.9,
P57):   
Risk category Description Mitigation
Business Contractors failing to
deliver according to
budget or timescales.
- Appropriate procurement
planning.
- Appropriate contract
penalties to be in place.
Service Lack of employer,
partner, and community
engagement.
- Consultation with
Community Planning
Partnership and cross
Page 10

Page 11

sharing of resources for
engagement.
- Utilise partner
connections. 
- Early understanding of
market needs
Project fails to deliver
core benefits. 
- Stakeholders have
strong reputation.
- Project planning and risk
management  /
operationalisation.
- Ongoing
communications and
partnership-working.
Wild Things partner fails
to raise the required
funds necessary to
support operational
costs. 
- Early engagement with
external funders.
- Consider alternate
suppliers should
organisation fail to meet
service requirements.
External
environment
Difficulty acquiring and
securing sites.
- Scope alternative
locations, seek legal
guidance at early project
stages. 
(e) Staffing Implications
The revenue model set out within the FBC makes provision for a number
of new roles that will be needed to ensure the successful delivery and
embedding of the project vision.  Specifically:  
- Engagement Manager:  0.7 FTE
- Engagement Officers:  1.4 FTE 
The STEM engagement roles will work across all Moray ASGs,
facilitating activity at fixed hubs and outreach activity. 
(f) Property
Approval of the FBC will see a range of STEM hubs constructed,
namely: 
- Refurbishment of space at Elgin Library and 2 satellite sites in Forres
and Buckie as part of future phases of the project.  
- A STEM learning centre to be developed at Milbuies Country Park in
conjunction with a local environmental charity. 
(g) Equalities/Socio Economic Impact
An integrated impact assessment covering equalities and socio-
economic duties along with human rights and rights of the child has been
considered as part of the FBC development process.  Information can be
found in appendix 4 of the FBC document.   
Page 11

Page 12

(h) Climate Change and Biodiversity Impacts
As part of their review process with the Governments, Growth Deal
projects need to take account of carbon and environmental
considerations, with net zero aspirations being integrated into design
briefs for new properties. 
(i) Consultations
The full business case that this report seeks approval for have been
subjected to significant consultation, as highlighted in section 3.4.   
More specifically, this has included engagement with a number of key
Council Officers including the Depute Chief Executive (Economy,
Environment and Finance), Depute Chief Executive (Education,
Communities and Organisational Development), Head of Education, ELC
Service Manager, Head of Economic Growth and Development, Chief
Financial Officer, Legal Services Manager and the Democratic Services
Manager. 
7 CONCLUSION 
7.1 This paper introduces a nearly final draft of the EY STEM FBC.  The
Council is asked to consider and approve this which, in conjunction with
receiving Government clearance, will enable it to enter delivery. 
7.2 Whilst the FBC presented has already been the subject of significant
review, the Council is asked to delegate authority for the Depute Chief
Executive (Education, Communities and Organisational Development) to
approval a final iteration following comments from the Governments. 
7.3 The Council is also asked to delegate authority to the Depute Chief
Executive (Economy, Environment and Finance) or other such signatory
as may be required to accept the Government grant for the project in
line with the terms of the Moray Growth Deal. 
Author of Report:  Michael Kelly, Moray Growth Deal Programme Manager 
Background Papers: 
▪ Full Deal documentation (December 2021) which includes the EY STEM
Outline Business Case (OBC) 
▪ Moray Growth Deal 2021/22 annual report:
o 8 March 2023
o 24 May 2023 
▪ Moray Growth Deal 2023 annual report:  
o 6 March 2024
o 22 May 2024  
Ref:  SPMAN-813460984-648   
Page 12

Page 13

APPENDIX 1 
Version Number: Issue 3 Date: 13.08.2024 
The following is to be completed by High Level Governance Board 
Approved By/Date  
Approval
(choose from drop
down menu) 
Choose an item.
Comments 
Version Date Details
0.1 31/10/2023 Initial draft for project board review incorporating
executive summary, strategic, commercial and
management cases
0.2 10/01/2024 Second draft for project board incorporating financial
case and updates to all sections
0.3 08/03/2024 Third draft for project board incorporating economic
case and updates to all sections
1.0 15/03/2024 Initial version for Moray Growth Deal Programme Board
and incorporating feedback from stakeholders and
project board. 
2.0 21/05/2024 Revised version incorporating feedback from Transform
Learning Board and Moray Growth Deal Programme
Board for submission to Scottish Government
3.0 13/08/2024 Third version incorporating feedback from Scottish
Government 
PROJECT REF/NAME Early Years STEM
PROJECT SPONSOR Hazel Sly
COMPLETED BY Sarah Barnes
DATE 13th August 2024
Project Category Strategic
Item 15a.
Page 13

Page 14

Page 2 of 142 
Table of Contents
Executive Summary ................................................................................................... 5 
Introduction .................................................................................................. 5 
What are the issues? ................................................................................... 6 
How will we fix the issues?........................................................................... 9 
Who is involved? ........................................................................................ 14 
How did we identify the solution? ............................................................... 14
The Long List .................................................................................................... 14
The short list...................................................................................................... 15 
Preferred Option ........................................................................................ 15
Key findings: economic appraisal ...................................................................... 15
Key findings: wider socio-economic impacts ..................................................... 17
Key findings: carbon assessment...................................................................... 17
Overall findings: the preferred option ................................................................ 18 
What is the solution? .................................................................................. 18
STEM Centre Network ...................................................................................... 19
Educational Programme .................................................................................... 22
STEM Coordinator Resource ............................................................................ 22
Mobile Offering .................................................................................................. 23
Outreach Offering .............................................................................................. 24
Environmental Sciences STEM Learning Centre .............................................. 24
STEM Grant Scheme ........................................................................................ 25 
How much will it cost? ................................................................................ 26 
How will it be delivered? ............................................................................ 26 
How will the benefits accrue? ..................................................................... 26 
Is it financially sustainable?........................................................................ 27 
How does the project fit in the strategic landscape? .................................. 27 
What else is happening in the region? ....................................................... 28 
What else needs to be done? .................................................................... 29
2. The Strategic Case ........................................................................................... 30 
Organisational overview ............................................................................. 30 
The strategic context .................................................................................. 30 
Business Strategy and Aims ...................................................................... 30 
Investment objectives ................................................................................ 34 
Existing Arrangements ............................................................................... 35
Skills Shortage and the Moray Economy .......................................................... 35
Raising Achievement and Improving Outcomes ............................................... 38 
Business Needs Current and Future .......................................................... 43
Early Intervention .............................................................................................. 43
Overcoming Barriers to Engagement ................................................................ 45
Collaborative Approach and Partnership Working............................................. 48
Increasing Science Capital across the STEM Ecosystem ................................. 49 
Potential scope and service requirements ................................................. 53 
Benefits criteria .......................................................................................... 55 
Strategic risks ............................................................................................ 57 
Constraints ................................................................................................. 59 
Dependencies ............................................................................................ 59
3. The Economic Case .......................................................................................... 60 
Introduction ................................................................................................ 60 
Critical Success Factors ............................................................................ 61 
Long Listed Options ................................................................................... 62 
Short- Listed Options ................................................................................. 63
Page 14

Page 15

Page 3 of 142 
Economic Appraisal ................................................................................... 68 
Quantitative Economic Appraisal ............................................................... 69
Description, Sources, and Assumptions ............................................................ 69
Estimating Costs ............................................................................................... 71
Estimating Benefits ........................................................................................... 74
Summary of benefits ......................................................................................... 83
Displacement and Deadweight Analysis ........................................................... 84
Benefit Cost Ratios ........................................................................................... 85
Optimism Bias ................................................................................................... 87
Sensitivity Analysis for the Preferred Option ..................................................... 87
Employment and GVA impacts in Moray ........................................................... 91 
Qualitative Benefits Appraisal .................................................................... 93
Anticipated Qualitative Benefits......................................................................... 93
Appraisal ........................................................................................................... 96 
Carbon Impacts ........................................................................................ 100 
Risk .......................................................................................................... 102
4. The Commercial Case .................................................................................... 105 
Required Services .................................................................................... 105
Outline of the Students Journey ...................................................................... 106
Phase 1 Activity ............................................................................................... 108
Phase 2 Activity ............................................................................................... 111
Phase 3 Activity ............................................................................................... 114
Phase 1 Procurement Activity ......................................................................... 115
Phase 2-3 Procurement Activity ...................................................................... 115
Subsidy Control ............................................................................................... 116 
Potential for Risk Transfer........................................................................ 116 
Proposed Charging Mechanisms ............................................................. 117 
Proposed Contract Lengths ..................................................................... 117 
Proposed Key Contractual Clauses ......................................................... 117 
Personnel Implications ............................................................................. 118
5. The Financial Case ......................................................................................... 119 
Impact on the organisations income and expenditure acount .................. 119 
Assumptions ............................................................................................ 122
Phase 1 ........................................................................................................... 122
Phase 2 ........................................................................................................... 122
Phase 3 ........................................................................................................... 123
Staffing Costs .................................................................................................. 123 
Overall Affordability .................................................................................. 124
6. The Management Case ................................................................................... 125 
Programme Management Arrangements ................................................. 125 
Project management Arrangements ........................................................ 126
Project Reporting Structure ............................................................................. 126
Operational Structure ...................................................................................... 128
Roles and Responsibilities .............................................................................. 130
Project Plan Summary .................................................................................... 132 
Use of Specialist Advisors........................................................................ 133 
Outline arrangements for risks issues and change management. ........... 134 
Outline arrangements risk management. ................................................. 134 
Outline arrangements for Benefits Realisation ......................................... 134 
Monitoring and Evaluation Arrangements ................................................ 134 
Outline arrangements for post project evaluation ..................................... 141 
Gateway review arrangements ................................................................ 141
Page 15

Page 16

Page 4 of 142 
Contingency Plans ................................................................................... 141 
Page 16

Page 17

APPENDIX 1 
Executive Summary 
Introduction
Early Years STEM aims to encourage young people to pursue a STEM related career
when they leave school or tertiary education and focuses on STEM engagement with
children in their early stages of learning (age 3-8). The project seeks to develop a
STEM learning ecosystem in the Moray area, through the creation of specialist
learning environments and experiences, access to training and resources, and the
creation of a STEM learning network involving Moray Council staff, key delivery
partners, and volunteers from industry and the wider community.
This innovative development will build on existing educational practices and initiatives
and will create the necessary infrastructure to support a STEM skills pathway from
early years through to broad general education and beyond. The focus on early year’s
intervention is a unique feature of this business case. 
The project will deliver a comprehensive package of investment over 10 years that
includes:
Phase 1 2024-2025
− A state-of-the-art STEM learning centre hosted within the region’s central public
library at Elgin Cooper Park. 
− A mobile facility fitted out with equipment that can be transported to and used
in any suitable venue across Moray. 
− An outreach offering, consisting of a central repository of STEM resources.
− A comprehensive learning programme aligned to the Scotland’s Curriculum for
Excellence that offers progression from early years through primary school.
− A dedicated team of STEM Coordinators to manage activity across all elements
of the project.
Phase 2 2026-2028
− Two satellite STEM hubs in the areas of Forres and  Buckie, to enhance the
reach of engagements across Moray. 
− An environmental sciences and outdoor STEM learning centre, developed and
delivered in partnership with a local environmental charity and focusing on
learning for sustainability. 
Phase 3 2029-2032
− A STEM Grant Scheme using ringfenced Moray Growth Deal funding to support
partnership activity and community focused STEM programmes and events. 
− Budget to update and refresh equipment.  
Early Years STEM aims to inspire and enhance the STEM learning experience of
children and staff through age appropriate, curriculum aligned and industry related
STEM experiences, while offering accessibility to parents, employers, and the wider
community, thereby allowing inter-generational learning to take place. 
The aspiration of this strategy is to close the equity gaps in participation and attainment
in STEM, ultimately leading more young people to choose STEM occupations at a
later stage in their lives.  
Page 17

Page 18

Page 6 of 142 
What are the issues? 
Skills Shortage and the Moray Economy
The UK economy is changing. According to research from the World Economic Forum
Assembly,1 labour market transformations are being driven by technological
breakthroughs, coupled with the shift to green energy and the broader application of
environmental, social and governance standards within organisations.  The fastest
growing roles are driven by technology, digitalization and sustainability as economies
shift towards renewable energy and benefit from advances in technology.  
These findings are consistent with labour market trends in Scotland’s Economy.
Research conducted by Skills Development Scotland2 indicate job displacement
caused by advances in technological development. Forecast employment change in
Moray by industry from 2026-2033 shows significant contraction in the manufacturing
sector, as new technologies and production methods will allow the sector to produce
more, but with fewer workers. Across all sectors, there will be a shift in the types of
roles and expectation of skills, as new ways of working and technologies are
introduced to the workplace. 
The Moray economy has lower wage levels than in Scotland, with full time workers in
Moray earning 10% less than their Scottish peers per hour on average. The gap
widens further when all full time and part time jobs are included, the average annual
wage in Moray £26,750 compared to £29,842 in Scotland.3 The gender pay gap
remains a serious issue, the Moray Economic Strategy 2022 reporting 16% in Moray
compared to the Scottish average of 13%.4 
Moray also has a lower proportion of people employed in highly skilled occupations
compared to the national level, with 35% in Moray at SOC 1-3 compared with 44% in
Scotland, and a higher concentration of employment in sectors with relatively low
wages. 65% of Morays residents aged 16-64 have a qualification at Higher level or
above compared to 68% nationally, and the share of residents with a degree or same
level professional qualification is 24% compared to 31% for Scotland.4 Research
conducted by Skills Development Scotland indicate jobs of the future are going to
require higher-level qualifications, with 43% of the Moray regions greatest requirement
at SCQF levels 7-10.2 
Moray, along with the rest of the Highlands and Islands, has historically seen a
significant outward migration of young people. A HIE commissioned report titled
“Young people in the Highlands and Islands: Maximising Opportunities” (2018) 5, found 
1 World Economic Forum Future of Jobs Report 2023.
https://www3.weforum.org/docs/WEF_Future_of_Jobs_2023.pdf
2 Regional Skills Assessment Moray Growth Deal 2023, Skills Development Scotland
https://www.skillsdevelopmentscotland.co.uk/media/4jakvfxz/rsa-growth-deal-report-moray.pdf
3 Annual Survey of Hours and Earnings (ASHE) 2023 ONS
https://www.nomisweb.co.uk/reports/lmp/la/1946157424/report.aspx
4 Moray Economic Strategy 2022, Towards Future Prosperity and Inclusive Growth
http://www.moray.gov.uk/downloads/file147200.pdf
5 Young People and Highlands and Islands: Maximising Opportunities, Nov 2018, HIE
https://www.hie.co.uk/media/3007/youngpluspeopleplusandplustheplushighlandsplusandplusislandspl
us-plusmaximisingplusopportunitiesplus-plusreport.pdf
Page 18

Page 19

Page 7 of 142 
that in Moray, 18% of the region’s population were age 15-30 compared to the national
average of 21% and 17% in the Highlands and Islands a whole. The report suggests
lack of opportunities in education and employment as contributing factors, with 80%
of 20–24-year-olds studying in universities outside of the Highlands and Islands, and
a large proportion of those students going on to pursue careers in other regions.  
Raising Achievement and Improving Outcomes
Improving achievement and attainment is a key strategic focus for the local authority,
as children in Moray currently perform below the Scottish average in attainment of
Curriculum for Excellence competencies.
Data obtained from Moray Councils Public Performance Report6 shows that in 2023,
75% of Moray children across primary 1, 4 and 7 achieved the expected levels in
numeracy, while the national average is 80%. Also in 2023, 87% of Moray children at
third level and 58% at fourth level achieved the expected levels in numeracy, whereas
the national average is 90% and 63% respectively. Numeracy is a basic enabler to
achieving qualifications in STEM and if children are behind in this by the time they
reach secondary school, then this makes attainment in line or above the Scottish
average ever more challenging. While there has been significant improvement in
achievement levels in numeracy from 2019 to 2023 (the gap closing from 14% to 5%),
further work is required to ensure Moray children perform at the same level as those
nationally.    
Performance data also shows that the number of school leavers attaining passes at
SCQF level 6 (Higher) is less than the national average, with 45% of Moray students
achieving 3 or more passes compared to the national average of 52%, and 29%
achieving 5 or more passes compared to the national average of 39%.6 
According to 2023 Scottish Qualification Authority (SQA) attainment statistics, Moray’s
students are less likely to attain in STEM related subjects than in Scotland, with the
percentage of Moray students attaining grades A-C at SCQF level 5 (National 5)
significantly lower than those in Scotland. Statistics also show a downward trend in
STEM attainment in Moray from 2021-2023.7 
While the number of Moray school leavers entering employment and further education
remains above national average, the number of Moray School leavers entering Higher
Education falls consistently below that of national peers. In 2023, 29% of Moray school
leavers entered employment compared to 27% nationally, whereas 33% of Moray
school leavers entered higher education compared to 40% nationally).6
Creating more appeal for STEM related jobs is important to facilitate the evolution of
skills required by the future jobs market, and to ensure Moray is resilient in the future.
As evident from the trends in attainment levels from broad education through to senior
phase and into leaver destinations, for positive attitudes to be embedded in terms of 
6 Public Performance Report for Primary and Secondary Schools, School Session 2022/23, Moray
Council Education 
http://www.moray.gov.uk/downloads/file154769.pdf
7 Attainment Statistics, Scottish Qualification Authority, 2023
https://www.sqa.org.uk/sqa/105123.html
Page 19

Page 20

Page 8 of 142 
STEM, this culture change needs to begin at a pre-school age and then sustained
through the young person’s progression through education. 
Overcoming Barriers to Engagement
While there is increasing focus on STEM education for young people, both at a national
and local level, there persists significant barriers that prevent participation in STEM
activities. A 2022 report by Ekosgen prepared on behalf of Education Scotland 8
presented key findings relating to the structural barriers to STEM engagement. The
report cited financial pressures within schools and across local authorities as a key
contributor, as well as building capacity within systems, and increasing the confidence
and skills of practitioners in the delivery of STEM related topics. Lack of STEM
resources and availability of flexible learning spaces within school settings was
highlighted as a significant barrier to STEM participation, as well as the need for
stronger links between schools and partner organisations. 
These findings are consistent with attitudes in Moray. There has been significant
engagement with parents, pupils and education staff, as the project has sought to
identify challenges, opportunities, and to obtain feedback on solutions proposed. 
To date, 
• 140 education staff have been consulted throughout project development,
including ELC practitioners, childminders, and primary and secondary teachers.  
• 253 children have been engaged, including responses from pupil surveys,
classroom visits and STEM workshops. 
• 109 parents have been consulted through public engagement events, STEM
taster sessions and feedback from targeted surveys. 
• Examples of engagement surveys are included in Appendix 12.
Education staff generally agreed that budgeting constraints, staff time, and competing
priorities limit the extend of STEM learning in settings. Feedback obtained through
consultation within the sector highlighted a specific need for ongoing access to STEM
resources, training, and materials, and while there was considerable support for
access to specialist learning environments, barriers associated with transportation
was highlighted as a concern. 
Both practitioners and learners agreed they would like more opportunities to
experience STEM in relation to the world of work and engage with local industry, and
that while significant progress has been made in connecting education with
employment through Developing the Young Workforce (DYW) initiatives, there are
less opportunities for early years settings. 
Parental feedback paints a similar picture, with a large proportion of those interviewed
viewing STEM as an important and essential part of their children’s learning. Families 
8 The Structural Barriers to STEM Engagement Final Report for Education Scotland, 2022, Ekosgen
https://education.gov.scot/media/axpjte2j/ekosgen-structural-barriers-to-stem-engagement-year-3-
report-exec-summary-nov-2022.pdf/
Page 20

Page 21

Page 9 of 142 
indicated they would like to participate in STEM engagements however cited lack of
opportunity as a barrier. Common answers when asked what type of STEM
opportunities audiences would like to see include outdoor learning, activities with a
focus on renewable energy and a “science centre type experience.” 
Science centres have been long been known as the focal point within a community for
STEM engagements, providing opportunities for schools and families alike to
participate in STEM activities and delivering outreach programmes within localities.
Aberdeen Science Centre is the closest of these institutions to Moray, however with a
2-hour commuting time from the centre of Moray, schools find it incredibly challenging
to engage with this kind of high quality, inspirational experience. 
The final threat to the skills make-up of the region is therefore rural in nature.  Children
in Moray need to have access to the same type of high-quality learning experiences
as their peers out with Moray. Given the rural nature of the region, accessibility to
infrastructure within Moray is also a challenge, and children in all parts of Moray need
to have access to the same or similar infrastructure and learning within a reasonable
distance no matter their location. 
How will we fix the issues?
Economic Growth and Opportunities for Skills Development
The Moray Growth Deal will deliver transformational investment to drive economic
growth across the region, supporting major new developments in key sectors of health,
aerospace, advanced technology, business enterprise, and manufacturing. The deal
involves eight strategic projects, including the Business Enterprise Hub (BEH), Digital
Health and Care Innovation (DHI) project, the Manufacturing Innovation Centre for
Moray (MICM), and the re-scoped Moray Aerospace and Advanced Technology
Innovation Centre (MAATIC) These projects will bring significant employment
opportunities to Moray and for Moray’s residents to benefit, increasing the STEM skills
of the future workforce is critical. 
Education and Curriculum Reform
The Scottish Government and local authorities remain committed to working together
in realising the ambition of achieving equity and excellence for all Scotland’s children
and young people. The International Council of Education Advisors (ICEA) view the
national discussion and Hayward review of assessment as providing the opportunity
for fresh and innovative ideas for improvement. Following key national review of the
National Improvement Framework (NIF) 2023 and in line with findings of wider national
reviews included in Professor Ken Muir’s Report 9, and the National Discussion on
Education10, focus is now on achievement rather than attainment, where this was seen
to be more in line with the four capacities of Curriculum for Excellence. 
9 Putting learners at the centre: towards a future vision for Scottish Education, 2022, Professor Ken
Muir
https://www.gov.scot/publications/putting-learners-centre-towards-future-vision-scottish-education/
10 All Learners in Scotland Matter – national discussion on education: final report, 2023
Page 21

Page 22

Page 10 of 142 
The Learning for sustainability: action plan 2023 to 2030 11 aims to build inspiring
movement for change so every 3 to 18 place of education becomes a sustainable
learning setting by 2030 and is a key strategic driver in the future of education, both
nationally and at the local level.  
The United Nations Convention on the Rights of the Child (Incorporation) (Scotland)
Act 2024 gained Royal Assent in January 2024.12 The Act will ensure that children’s
rights are respected and protected in the law in Scotland, and all public bodies in
Scotland will have to comply with the legislation. 
Significant efforts have been made across Moray Education in recent years to build
and maintain improvement in attainment at Broad General Education (BGE) level.
Among these actions is the development of Moray Improvement Groups, a
collaborative effort across agencies to support revised educational strategies.  Central
officers lead on the development of core progressions and learning pathways across
curriculum areas, including STEM. In line with the Scottish Governments Framework
for Recovery and Accelerating Progress13, Core Stretch Aims have been set out in
relation to achievement and attainment. 
Early Intervention
There has been significant research undertaken in recent years into what factors
influence a child’s engagement with STEM. The 2013 ASPIRES report by Kings
College London is a significant and long-term study into young people’s science and
careers aspirations from age 10 to 1414. The report found that young people’s attitudes
towards STEM are consistent from age 10 to 14, and that those who do not express
interest by age 10 are unlikely to develop STEM aspirations by the age of 14. The
report acknowledged that STEM engagements must begin before secondary level and
highlighted the importance of primary STEM education. 
Indeed, there is growing scientific consensus about the importance of implementing
STEM education at a much younger age. According to the 2017 report by the Joan
Ganz Cooney Centre, implementing STEM education at an early stage encourages
the development of key skills relating to problem solving, trial and error and critical
thinking skills, and can lay the groundwork for a deeper understanding of difficult
concepts at a later stage.15 
https://www.gov.scot/publications/learners-scotland-matter-national-discussion-summary-report/
11 Learning for sustainability: action plan 2023 to 2030, Scottish Government, 2023
https://www.gov.scot/publications/target-2030-movement-people-planet-prosperity/
12 A Summary United Nations Convention on the Rights of a Child, Unicef, 2022
https://www.unicef.org.uk/wp-content/uploads/2019/10/UNCRC_summary-1_1.pdf
13  Scottish Attainment Challenge: Framework for Recovery and Accelerating Progress, 2023, Scottish
Government. 
https://www.gov.scot/publications/scottish-attainment-challenge-framework-recovery-accelerating-
progress-2/pages/3/
14 ASPIRES Young People’s science and career aspirations, age 10-14, Kings College London 2013
https://kclpure.kcl.ac.uk/ws/portalfiles/portal/64130521/ASPIRES_Report_2013.pdf
15 STEM Starts Early: Grounding science, technology, engineering and math education in early
childhood, Joan Ganz Cooney Centre, 2017
https://joanganzcooneycenter.org/wp-content/uploads/2017/01/jgcc_stemstartsearly_final.pdf
Page 22

Page 23

Page 11 of 142 
A growing number of studies show a correlation between early experiences with STEM
subjects and later success in those subjects or in school generally. The 2015 report
Transforming the Workforce for Children Birth through Age 816 states that children who
engage in scientific activities from an early age develop positive attitudes towards
science, which also correlate with later science achievement, and they are more likely
to pursue STEM expertise and careers later. 
While there is no single approach that can be taken to adequately prepare today’s
children to enter tomorrow’s workplace, the foundation work is already being put in
place in Moray that this Early Years STEM initiative can further build on.  
In line with the Early Intervention approach taken across wider services in Moray,
STEM learning activities will be initiated at the Early Learning and Childcare (ELC)
stage. This acknowledges that to increase attainment in STEM we need engage with
children in the early years setting to generate interest in the STEM curriculum once
the children are older.  To do this requires a multi-pronged approach beginning before
children start school and sustained through primary and secondary school education
levels. 
While work in Early Learning and Childcare (ELC) is further developing, a good start
has been made with the implementation of Talking Tubs to stimulate discussion about
different vocations including those STEM related. This links to early work with
practitioners around gender imbalance training that ties in with the child centred
pedagogy approach. Early Years STEM, through investment in training, resources,
and creation of specialist learning environments, will further enhance the awareness
of STEM related careers in early year’s settings.   
Learning for Sustainability and Climate Awareness
Outdoor learning continues to be a focus for ELC settings in Moray, with key initiatives
developed in recent years promoting STEM and learning for sustainability. With
increasing focus on climate change and the shift to green energy, the launch of the
LfS Action Plan 2023 to 203017, and the Moray Councils commitment to achieving net
zero by 2030, creating more opportunities for outdoor learning, environmental
education and learning for sustainability has never been more important.  Early Years
STEM will address this challenge through the creation of a specialist outdoor learning
facility and outreach programme. 
Collaborative Approach and Partnership Working
Addressing these challenges is a complex endeavour and responsibility cannot lie on
the Moray Council and Education Sector alone. Raising the aspirations of young
people in STEM and giving them the skills and confidence to pursue STEM subjects 
16 Transforming the Workforce for Children Birth Through Age 8: A Unifying Foundation 2015, Institute
of Medicine and National Research Council
https://www.fcd-us.org/wp-content/uploads/2016/10/IOMNRCFullReport2015.pdf
17 Learning for sustainability: action plan 2023 to 2030, Scottish Government, 2023
https://www.gov.scot/publications/target-2030-movement-people-planet-prosperity/
Page 23

Page 24

Page 12 of 142 
throughout education and into employment, relies on a coordinated, cohesive effort
within the whole STEM ecosystem.  
Early Years STEM will work collaboratively with key delivery partners within Morays
Education Sector, as well as local employers and other Moray Growth Deal Projects
to build capacity within the education system and deliver learning opportunities that
are dynamic and flexible in response to the evolving priorities within the sector. 
This work has already been initiated through the implementation of a STEM Moray
Strategy Group, whose focus is to develop a coordinated and cohesive offer that maps
STEM activity in the region, addresses the gaps in STEM provision and creates new
and exciting opportunities for children and families to engage with STEM learning.
Participants in the steering group have offered letters of support included in Appendix
14, that highlight the nature of the collaboration and how partners contribution will
facilitate engagements beyond age 8. 
Early Years STEM continues to engage with stakeholders at a local and national level
to identify lessons learned, synergies and create opportunities for collaboration. This
includes other Growth Deal STEM projects such as the Argyll and Bute STEM Hubs,
and the Newton Room development delivered as part of the Outer Hebrides Campus
re-development project. Other stakeholders and initiatives engaged with Early Years
STEM include Techfest, Energy Skills Partnership, the Catapult Network, and
Prospers STEMOVATORS (formerly SCDI’s Young Engineers and Science Club
Programme). 
Increasing Science Capital across the STEM Ecosystem
The ecological systems model suggests that children develop within nested systems
of influence, with the child at the centre.18 This complex intertwined web of
relationships, experiences and environments recognises that to successfully integrate
STEM learning and change children’s perceptions of STEM, all factors must be
considered in equal measure. This concept is further reiterated in the 2022 Structural
Barriers to STEM Engagement Report19, which speaks to the complexity of the learner
environment and the numerous influences facing the young person in their STEM
learning journey.  
The concept of “science capital” has been gaining significant traction over the years.
The Enterprising Science partnership of BP, Kings College London and the Science
Museum Group identified eight key dimensions of science capital20: science literacy;
science-related attitudes and dispositions; knowledge about the transferability of
science; science media consumption; participation in out-of-school learning contexts; 
18 STEM Starts Early: Grounding science, technology, engineering and math education in early
childhood, Joan Ganz Cooney Centre, 2017
https://joanganzcooneycenter.org/wp-content/uploads/2017/01/jgcc_stemstartsearly_final.pdf
19 The Structural Barriers to STEM Engagement Final Report for Education Scotland, 2022, Ekosgen
https://education.gov.scot/media/axpjte2j/ekosgen-structural-barriers-to-stem-engagement-year-3-
report-exec-summary-nov-2022.pdf
20 Science Capital Made Clear, Enterprising Science Partnership, 2015
https://kclpure.kcl.ac.uk/ws/portalfiles/portal/49685107/Science_Capital_Made_Clear.pdf 
Page 24

Page 25

Page 13 of 142 
family science skills, knowledge, and qualifications; knowing people in science related
roles; and talking about science in everyday life.
Science capital recognises the need for STEM engagement beyond that of the school
environment. Schools have traditionally been the place for children to develop
disciplinary thinking, however, schools are not the only place in a community where
education takes place; they exist within a community’s learning ecosystem. Schools,
businesses, science museums, libraries, and the home are settings that make up a
community’s learning ecosystem, and this subset of places is designed to support the
development of STEM disciplinary ways of thinking. 
These extended education contexts are an important and necessary part of the STEM
learning ecosystem as they provide opportunities to explore STEM content outside of
formal school settings. They are also known to be effective in engaging families with
STEM activities, leading to strengthening of science capital in families. 
The 2013 ASPIRES report by Kings College London found that the chances of a young
person going on to study STEM are greatly influenced by the amount of “science
capital” in the family. Parental influence, particularly in the early years, is paramount
to nurturing a child’s aspirations in STEM and to fully embed STEM learning and
change the way STEM is perceived in the region, there needs to be a more focused
and coordinated effort for families to engage with STEM, in both formal and informal
education settings. Parental Engagement is a key strategic focus for the local
authority, with increasing opportunities for parents to engage with the curriculum in
early learning and school settings, as highlighted in Moray Council’s Parental
Involvement and Engagement (PIE) strategy.
STEM has seen a resurgence in Moray in recent years as communities recognise the
importance of STEM based learning across all ages and sectors. The Moray Councils
Library and Learning Centre team have been particularly successful in engaging
young people with STEM, through delivery of coding workshops, digital explorer’s
programmes, and the provision of STEM loan kits to the public.  The Moray Councils
Adult & Family Learning team have also made significant efforts to engage families
with STEM, through delivery of national programmes such as Multiply and family
focused STEM workshops in nursery and school settings.  However, access to
environments, resources and training limits the extent to which teams can engage with
audiences. 
STEM learning opportunities extend beyond the local authority and education sector;
as local museums, discovery centres and community hubs also deliver STEM related
activities and experiences.  While these activities highlight the regions commitment to
learning and appetite for STEM engagements, Moray needs a dedicated informal
STEM learning environment that can bridge the gap between schools, employers,
families, and the wider community.  
Early Years STEM will invest in state-of-the-art facilities in community settings across
Moray. These spaces will offer core learning equipment and digital infrastructure that
will allow children, families, and the wider community of all ages to engage with STEM.
The environments will include interactive exhibitions and experiences for self-led, child
Page 25

Page 26

Page 14 of 142 
centred learning opportunities, thereby offering a “science centre type experience” that
can be delivered through Moray Growth Deal funding and sustained within existing
Moray Council resources. 
The facilities will also offer accessibility to community groups, STEM clubs and Moray
Council CLD teams to deliver STEM learning to audiences, including early years.
Employers, STEM Ambassadors and community volunteers will also be engaged to
deliver STEM learning within these facilities, where access to infrastructure has
previously limited these types of interactions. 
Creating educational facilities that offers equitable access to education settings,
families, employers and the wider community, the Early Years STEM project aims to
create an ecosystem of STEM learning that encourages multi agency participation and
changes the way STEM is perceived in the region. 
Who is involved?
The Early Years STEM Project Board provides overall governance for the project and
is made up of representatives from the following organisations:  
• Moray Council
• Moray College UHI
• The University of the Highlands and Islands (UHI)
• Skills Development Scotland (SDS)
• Developing the Young Workforce (DYW Moray)
• NHS Grampian
• Boeing
• Gordon and MacPhail
• Aberdeen Science Centre (ASC)
• Education Scotland
• SSERC 
How did we identify the solution?
A series of options had been developed and fully considered by the Project Board in
the formation and design of the proposed Early Years STEM project. These were later
refined to five core long listed options at Outline Business Case stage, of which this
was later reduced and refined to a shortlisted three options during the options
appraisal for the Full Business Case.
The Long List 
When developing the long list of options, the elements with potential to form part of
the overall offer within the Early Years STEM project, and the impact of one or more
of them not proceeding, were considered.  These options included:
Page 26

Page 27

Page 15 of 142 
• Option 1: business as usual
• Option 2 (Minimum): a hub provision in each early learning and primary
setting, a mobile offering and partnership activity
• Option 3 (Intermediate): one central provision, a mobile and outreach
offering and partnership activity.
• Option 4 (Intermediate): a provision in targeted locations across Moray, a
mobile and outreach offering and partnership activity.
• Option 5 (Maximum): a provision in each ASG in Moray, a mobile offering
and partnership activity.
A variety of solutions, delivery options, funding arrangements and implementation
plans were considered.  Each option was considered in respect to its contributions to
each of the six stated investment objectives, and the Critical Success Factors (CSFs)
of strategic fit, value for money, achievability, supply side capacity and affordability. 
The short list 
As the business case progressed to Full Business Case (FBC) stage, three short-listed
options were carried forward: Option 2, Option 3, and Option 4. Option 1 was
discounted (but presented as the “Business as Usual” status quo option as a baseline
comparator) as it presented little evidence of impact, is un-coordinated and duplicates
activity amongst providers, and the demand for Option 5 has been tested in
engagement with education staff who indicated limited utilisation of fixed facilities in
rural areas (with a preference for flexible mobile solutions). Neither Option represented
a value for money solution, with duplication in Option 1 and underutilisation in Option
5 and were therefore discounted from the economic appraisal. As such, the economic
appraisal has been conducted on the shortlisted three options. 
Preferred Option
Key findings: economic appraisal 
Total costs (including the embodied and operational costs of carbon) are provided at
Net Present Value (NPV) for each option as below. Option 4 presents the largest costs
of the three options, predominantly because there is a larger scope of activity included
within this option than Option 2 or Option 3.
Comparison of Options: Costs (,000, NPV) 
Option/Cost Total Project
Costs
Carbon Costs Total Costs
1-Business as Usual - - -
2 3,522 148 3,671
3 4,740 128 4,868
4-Preferred Option 5,125 1058 5,233 
An estimate of the benefits arising from each option for the proposed development has
been made.  These are the same indicators that were assessed at OBC stage, namely:
projected uplifts in salary, the indirect and induced benefits arising from this uplift, and
Page 27

Page 28

Page 16 of 142 
the savings to the public purse resulting from unemployment prevention. These
benefits have been assessed at the Moray, Scotland and UK spatial levels, the
summary of which is provided below. At each level, Option 4 delivers the highest
number of benefits within each of the three geographies.
Comparison of Options: Benefits (,000, NPV) 2021/22 to 2043/44: 10-year Benefits
Stream
Option/Benefit Moray Level Scotland Level UK Level
1-Business as Usual - - -
2 6,473 8,976 19,060
3 8,140 11,274 23,890
4-Preferred Option 10,992 14,944 30,391 
To provide assurance that the proposed development represents value for money
(VfM), a Benefit Cost Ratio (BCR) has been applied at the Moray, Scotland, and UK
levels. As can be seen in the following table, Option 4 presents the highest BCR at
each spatial level, and considerably more so at the UK level. In Moray, Option 4 has
a BCR of 2.1, compared to 1.8 for Option 2 and 1.7 for Option 3. 
Comparison of Options: BCR 2021/22 to 2043/44: 10-year Benefits Stream 
Option/Benefit Moray Level Scotland Level UK Level
1-Business as Usual - - -
2 1.8 2.4 5.2
3 1.7 2.3 4.9
4-Preferred Option 2.1 2.9 5.8 
The performance of the options was also tested for a 12-year benefit stream. This
produced higher BCRs in each case. For example, each of the three options in Moray
had a BCR of more than 2, with Option 4 having a BCR of 3.1.
An assessment of the GVA and employment impacts arising from project expenditures
(i.e. the capital spend, revenue spend and employment impacts relating directly to the
project) on suppliers and the wider supply chain in Moray has been conducted. These
have been expressed in terms of FTE job years and GVA. 
Option 4 delivers the highest number of job years (39), reflecting the higher number of
project staff required than in the other two options. The GVA impacts for Option 3 and
Option 4 are very similar at around £1.5 million with Option 3 presenting slightly higher
impacts being realised. 
Employment Impacts in Moray from Project Expenditure (FTE Job Years)
Option/Benefit Capital
Spend
Revenue
Spend
Project Staff Total
1-Business as Usual - - - -
2 3 <1 8 11
3 16 4 14 34
4-Preferred Option 17 2 20 39 
Page 28

Page 29

Page 17 of 142 
GVA Impacts in Moray from Project Expenditure (£,000)
Option/Benefit Capital Spend Revenue Spend Total
1-Business as Usual - - -
2 94 36 131
3 1,244 257 1,501
4-Preferred Option 1,328 166 1,494 
Key findings: wider socio-economic impacts 
To appraise the wider benefits arising from the proposed development, an assessment
of the more qualitative benefits outlined in the Benefits Realisation Plan (BRP) was
conducted. These were thematically categorised across the themes expressed in the
BRP, namely: Productivity; People; Population; Place; and Fairer Scotland Duty. The
expected benefits of each option were scored individually, based on the alignment of
each option with the feasibility and magnitude to which each option delivers on these
benefits. Summative narrative explaining the scores has been provided on a thematic
basis.
Option 4 scored the highest across each of the themes, with the proposed delivery of
a bespoke Environmental Education Centre and proposed targeted STEM facilities
having significant influence on the scoring of the benefits derived from Option 4. This
is in addition to the network of satellite sites, the mobile offer, and the robust outreach
offering expressed in other options. 
Theme Option 2 Option 3 Option 4
Raw (R) and Weighted (W)
Scores
R W R W R W
Productivity 3 0.15 7 0.35 8 0.4
People 12 1 20 1.65 30 2.35
Population 1 0.05 2 0.1 4 0.2
Place 1 0.05 12 0.6 14 0.7
Fairer Scotland Duty 3 0.3 8 0.6 10 0.75
Total Score 20 1.55 49 3.3 66 4.4
Weighted % 31% 66% 88% 
Key findings: carbon assessment 
A carbon assessment of the preferred option (Option 4) has been provided, which
considers the embodied carbon and operational carbon emissions arising from the
proposed development. Following the estimation of these emissions, they have been
costed using monetised carbon values at 2028 prices, and these costs have been
included in the overarching cost-benefit analysis.
Taking the central estimates for monetised carbon prices (at 2028 values):
• the estimated total embodied carbon cost for the project is £108,101;
• the estimated total operational carbon cost for the project is £148,901; and
• therefore, the total estimated carbon cost for the project is £257,002.
Page 29

Page 30

Page 18 of 142 
Carbon Emissions Total estimated
carbon emissions
(tCO2e)
Total estimated monetised carbon
values (2028 prices)
Low Central High
Embodied 397 £54,050 £108,101 £162,151
Operational  547 £74,450 £148,901 £223,351
Total 945 £128,501 £257,002 £385,503 
Overall findings: the preferred option 
Option 4 is the preferred option due to its ability to deliver against the stated investment
objectives and contribute to the realisation of economic and wider qualitative benefits. 
Summary of Option 4: 2021/22 to 2043/44: 10-year
Benefits Stream
NPV and BCR
Total Project Cost (£m) £6.395m
NPV of Project Cost (£m) £5.233m
NPV of Project Benefits (£m; Moray) £10.922m
Benefit Cost Ratio (Moray) 2.1
NPV of Project Benefits (£m, Scotland) £14.994m
Benefit Cost Ratio (Scotland) 2.9
NPV of Project Benefits (£m, UK) £30.391m
Benefit Cost Ratio (UK) 5.8 
For comparison, the Benefit Cost Ratios (BCRs) for the alternative possible options
were also appraised. These were 5.2 (Option 2) and 4.9 (Option 3) at the UK level,
with Option 4 having a BCR of 5.8. At the Scotland level, Option 4 has a BCR of 2.9
compared to 2.4 (Option 2) and 2.3 (Option 3). At the Moray level, Option 4 would
produce a BCR of 2.1 compared to 1.8 (Option 2) and 1.7 (Option 3). 
What is the solution?
The solution is a whole systems approach to address the challenges laid out in earlier
sections of this Full Business Case.  Early Years STEM aims to develop a STEM
learning ecosystem in the Moray area, through the creation of specialist learning
environments and experiences, access to training and resources, and the creation of
a STEM learning network involving Moray Council staff, key delivery partners, and
volunteers from industry and the wider community.  The concept focuses on mapping,
collecting, and enhancing the STEM in Moray, to create STEM communities and
provide opportunities for young people across all levels.
Specifically, the solution will see investment in infrastructure to support a programme
of learning applicable to all age groups but with particular focus on the age 3-8
bracket.  Infrastructure includes physical, digital, and mobile learning environments.
Page 30

Page 31

Page 19 of 142 
The project will see a comprehensive package of investment summarised in Figure 1
that delivers against the key components of the STEM ecosystem.
STEM Centre Network 
This package of work will see the creation of state-of-the-art facilities hosted within
community settings across Moray. Each facility will offer core learning equipment and
digital infrastructure that will allow learners of all ages to engage with the STEM
curriculum. A specialist teaching space that will act as a shared STEM resource for
local nurseries, schools, and community groups.
As the focus of this initiative is to engage with early learners and the influential systems
in their life, each environment will host a dedicated early years learning space offering
an open ended and child centred experience that encourages family engagement and
inter-generational learning.  Experiences may include physical interactive exhibits,
investigation stations, maker-space facilities, role-play areas, digital opportunities, and
any other type of content.  The final solution will be developed in consultation with key
stakeholders and user groups, supported by an exhibition and interpretation design
partner appointed to progress design and fit out of the physical spaces. 
Through a Moray wide approach, a distinctive feature of this work package is to
address rurality as a barrier to participation in STEM activities. The preferred option at
Outline Business Case (OBC) stage focused on a provision in each Associated School
Group (ASG) in Moray however, following risk identification, stakeholder consultation
and options appraisal, the agreed scope taken forward in this Full Business Case is a
fixed facility in Elgin, Forres and Buckie with a mobile “pop-up” offer serving the
remaining ASG areas. This change in scope recognises transportation as a barrier to
participation in rural areas, and the value for money of fixed facilities in areas where
utilisation may be limited.  
As part of the options appraisal process, redevelopment of existing spaces within
community settings was identified as a priority for site selection, as the project seeks
to reduce operational costs, carbon emissions and maximise community benefit. 
Figure 1 Early Years STEM Project Scope
Page 31

Page 32

Page 20 of 142 
Elgin STEM Centre 
As part of Phase 1 activity, the first STEM centre will be hosted within Moray’s Central
Public Library at Elgin, Cooper Park. The public library is seen as having great
potential for implementing informal STEM education. Libraries have long been the
pillar of communities, providing equitable access and learning opportunities to a
diverse group of people. Libraries have also been known to bridge STEM learning with
schools as well as in the home environment. 
The Early Years STEM Project has sought to collaborate with Moray’s Library Network
to enhance STEM learning in Moray. This partnership seeks to deliver mutually aligned
learning objectives while sharing resources where possible, through co-location,
provision of specialist equipment and support from staff.  
Current proposals will see renovation of the former drill hall into a Children’s STEM
Discovery Zone and Community Learning Hub, as well as redevelopment of key
functional areas within the building necessary to host the STEM space.  This will be
the largest space within the Network and will serve as a focal point for early years
STEM education, delivering innovative STEM learning experiences and coordinating
STEM activity across the region. Early architectural concepts are depicted in Figures
2 & 3. 
Figure 2 Early Concept Proposals Elgin Library 
Figure 3 Early Concept Proposals Elgin Library
The Community Learning Hub will offer a flexible scalable space with core learning
equipment suitable for delivery of STEM focused workshops.  This will be a shared
space available for the Library, Learning Centre, and Adult and Family Learning teams
Page 32

Page 33

Page 21 of 142 
to deliver learning programmes, including after school activities, thereby facilitating
inter-generational learning and maximising community benefit.  
The STEM Discovery Zone will host a series of interactive exhibitions and
experiences, a space where children, educators and families can get hands on with
equipment and explore STEM subjects in an integrated and creative way. The
environment will offer an open-ended, child centred experience that encourages family
engagement and inter-generational learning.   
The Early Years STEM project will collaborate with other Growth Deal led projects to
offer aligned learning experiences, including STEM focused visits and experiences at
the partner locations. With the Elgin STEM Centre offering age-appropriate, early
years learning experiences, and industry focused experiences offered at partner sites,
this will support development of STEM learning pathways from early years through to
Broad General Education (BGE) and beyond. 
As the STEM learning centre will be based in a community focused environment,
community groups will be engaged to access the STEM learning centre and deliver
community led STEM experiences, ensuring the centre is used to its full potential.
Local STEM Providers will also be engaged to host STEM learning experiences at the
centre.
The ambition is to create a community based educational facility offering STEM
focused experiences, delivered by a multi-agency collaboration that includes
dedicated staff, partner providers and community and industry volunteers. 
A letter of support from the Moray Council library service is included in Appendix 14.
Forres STEM Centre 
Early Years STEM is in active discussion with the Leanchoil Trust to host a dedicated
STEM centre within the renovated Leanchoil Hospital in Forres21. The Trust is
embarking on an ambitious project to transform a unique listed building and
surrounding landscape into a community focused Health and Wellbeing Centre. 
The centre will offer activities and services to support wellbeing, social engagement,
volunteering, employment, and learning, bringing enduring benefit to the people of
Forres and its rural communities. 
The vision for this STEM space is aligned to the Elgin Facility, with the creation of an
early year’s interactive learning space and community learning hub. This will be a
shared resource, with the Moray Council STEM Team delivering programmes to the
target audience, and the Trust accessing facilities for the benefit of the wider Forres
Community. This facility will have a strong emphasis on health and wellbeing, outdoor
education, and digital technology, due to the nature of the facility, location within a
woodland setting and opportunity to link with the Digital Health and Care Innovation
Project. 
A letter of support from the Leanchoil Trust is included in Appendix 14. 
21 The Leanchoil Trust https://www.leanchoiltrust.org/the-plans/
Page 33

Page 34

Page 22 of 142 
Buckie STEM Centre 
Planning for the Buckie facility is still under development however a preferred location
has been identified. The community hall above Buckie library is a vacant council
owned facility, and proposals will see this space transformed into an active learning
environment that is aligned with the vision for the Forres and Elgin facilities.
Development of the Buckie facility is anticipated to begin in 2028; therefore, site
options will continue to be identified and reviewed throughout the project. For this FBC,
cost estimates and benefits appraisals will be progressed on the assumption of Buckie
Community Town Hall as the preferred site. 
Educational Programme 
Key to the successful of this project is the ability to build upon a comprehensive
learning programme aligned to Scotland’s Curriculum for Excellence that offers
progression from early years through to broad general education.  Early Years STEM
will work collaboratively and iteratively with partners and education staff to develop
learning content that covers the core curricular areas of Science, Technology and
Numeracy while introducing career pathways in the context of Moray’s local economy.
The team will adopt an inter-disciplinary learning (IDL) approach that integrates
literacy, health & wellbeing, learning for sustainability and careers education.  
Learning materials will complement existing Moray educational practices, including
Moray science & technology progressions currently under development within Moray
Council Education. 
The Education Programme will offer both specialist content and simple activities that
can be easily repeated by education staff in schools and nurseries.  
Early Years STEM Coordinators will develop the curricular materials, supported by
STEM partners and an exhibition and interpretation design consultant appointed to
design and deliver the learning spaces. Information relating to the educational offering,
STEM learning centres, mobile solution and partner activity will be included within a
digital portal, developed as part of phase 1 activity. 
Glasgow Science Centre has been appointed to undertake a design process for the
interior fit out of the learning space, as well as development of an educational
programme. A Stage 2 Concept Design Report is included in Appendix 10, and
highlights the projects approach to learning content. 
STEM Coordinator Resource 
In successfully implementing STEM learning and creating a STEM ecosystem in the
Moray area, it is critical to have the support of knowledgeable and enthusiastic staff,
committed to changing the perceptions of STEM. An example of good practice is the
Raising Aspiration in Science pilot project (RAiSE) launched in Moray in 2016. The
Wood Foundation, Scottish Government and Moray Council jointly funded this 23-
month £160,000 project, with the primary expense being employing a Primary Science
Development Officer. The focus of the programme was to increase competence and
confidence in practitioners in the delivery of STEM curriculum.  
Page 34

Page 35

Page 23 of 142 
An external evaluation of the RAiSE programme was conducted at the national level
by Glasgow University and found that of those children involved with RAiSE, 87% had
enjoyed more challenge and 77% had increased their STEM aspirations. 22 This is a
high impact for a relatively small project over a short timeframe and demonstrates the
significant impact STEM staff can make.  
A dedicated team of STEM Coordinators will be employed to manage activity across
all elements of the project, including outreach, STEM delivery at the centres, and co-
ordination of partnership activity. The STEM office will support workforce development,
delivering training to staff across all Associated School Groups (ASG)s and creating a
network of STEM champions from early learning and school settings throughout
Moray. This work will build on the success of the ELC Moray STEM in the Outdoor
Project, the existing trained champions’ embedding a “cluster approach” and
supporting early stages of workforce development.  Employing this approach, the
STEM office will also create a network of community STEM champions including
parents and members of the public.
Recognising the budgetary pressures and time constraints faced by education staff,
EY STEMs approach to staff training will be as flexible as possible. This includes virtual
twilight sessions, recorded sessions, and in-person sessions at a STEM centre, ELC
or classroom setting. 
Moray Council will fund revenue requirements, however given the budgeting pressures
in today’s climate; this will be a limited resource that can be delivered within the
existing revenue budget. Reducing the number of facilities and minimising operational
costs through co-location has allowed the project team to re-profile the OBC revenue
budget to include a dedicated staffing resource as indicated in the financial section of
this business case. The coordinator resource is critical to delivery of business case
outcomes.  
Delivery options are being considered and include either recruitment of project staff
employed directly by the Moray Council, or outsourcing delivery through a Contract for
Services. Under either delivery option, contract management will sit with the Moray
Council. 
Mobile Offering 
A distinct feature of this Early Years STEM initiative is to address rurality as a barrier
to participation. Early Years STEM draws inspiration from successful programmes
such as Glasgow Science Centres Powering the Future on Tour, Cambridge Science
Centre’s Pop-up Science, and the Science Skills Academy’s Pop-up Newton Room,
and will develop a mobile solution that parallels and extends the STEM Learning
Centre into all ASGs in Moray. A range of mobile facilities and equipment, including
portable exhibits, will be developed that can be transported to and used in any suitable 
22 Raising Aspirations in Science Education (RAiSE) Pilot Final Evaluation Report 2019, University of
Glasgow
https://www.thewoodfoundation.org.uk/wp-content/uploads/2019/05/RAiSE-evaluation-report-
finalised-.pdf
Page 35

Page 36

Page 24 of 142 
venue including schools, community halls, and business premises, throughout Moray.
This will be achieved through the purchase of a medium sized electrical vehicle that
can be driven using a standard UK driving license.  To generate excitement and
showcase the learning offer, the vehicle will have specialist branding and fit out. Figure
3 depicts the preferred precedent for the STEM vehicle.   
Figure 3 STEM Vehicle Preferred Precedent 
Outreach Offering 
Phase 1 will also see development and delivery of a central repository of STEM
resources, available for Early Learning and Childcare (ELC) and primary settings to
borrow for classroom-based STEM activity. This will be developed and delivered in
collaboration with UHI Moray and other partners, with each organisation hosting a
suite of kits tailored to the needs of the Moray region. 
STEM coordinators will facilitate engagements, bringing a themed kit to the ELC or
primary setting, and providing training to ELC and teaching staff in its delivery. 
Environmental Sciences STEM Learning Centre 
This work package will see the creation of an Environmental Sciences STEM Learning
Centre, developed, and delivered in partnership with a Local Environmental Charity. 
Wild Things are uniquely positioned to run a STEM Hub of this nature, due to their
commitment as a charitable organisation to deliver environmental learning, experience
working within Moray’s education network, and ability to sustain their organisation
through access to ongoing external funding sources. The charity also delivers the
added advantage of owning a fleet of buses that can be used to transport children
from their settings to the centre. 
The proposal is to develop a vacant plot on Moray Council owned Common Good
Land at Milbuies Country Park into an Environmental Sciences STEM Learning
Centre. Moray Growth Deal funding will be used to develop the core infrastructure as
depicted in figure 4, including education and parking facilities, green energy solutions,
green infrastructure, and core learning equipment. 
Page 36

Page 37

Page 25 of 142 
Figure 4 Wild Things Education Centre at Milbuies
In line with the Moray Councils Climate Change Strategy and outcomes relating to
learning for sustainability, activities that will be undertaken on the land include leading
groups of learners in environmental exploration, and conservation. The aim of
expanding their knowledge of environmental and biological sciences, furthering their
appreciation for and care of the nature world, and inspiring young people to consider
the wide-ranging career opportunities in the growing sector of environmental sciences.  
This innovative partnership with Wild Things will deliver against Early Years STEM
targets in relation to STEM engagements, whilst also delivering Wild Things own
environmental education activities in line with their charitable mission, which is to
create mutually beneficial relationships between individuals, communities, and the
natural world.
The delivery mechanism for this development is still being explored, however it is
anticipated that the site will be leased to and managed by Wild Things. 
STEM Grant Scheme
Early Years STEM seeks to create a STEM ecosystem in the Moray area through the
creation of a STEM Learning Network involving employers, higher education
institutions, partner providers, museums, and community volunteers. 
A portion of Moray Growth Deal funding will be ring fenced to support specific activity
relating to these partnerships. This will be in the form of an annual budget allowance
that can delivered in the form of capital grants and provision of specialist equipment
to support a diverse range of projects and initiatives throughout Moray. 
Working with partners such as Developing the Young Workforce, Moray College UHI
and the private sector, employers will be engaged to host STEM activities and events
at industry sites to allow young people to see for themselves STEM activity being
brought to life, generate excitement, and interest in STEM and embed knowledge of
the opportunities that are possible in Moray. 
Page 37

Page 38

Page 26 of 142 
Community organisations and groups will have the opportunity to apply for funding to
support a wide variety of STEM related projects and initiatives, such as makerspaces,
Lego clubs, after school STEM clubs. Schools can apply for funding to purchase STEM
materials that will enable delivery of STEM clubs and facilitate parental engagement. 
An outline criteria for the STEM Grant Scheme is included in Appendix 13. 
How much will it cost?
The project will cost £6.4 million. This will be funded from £3.5 million of capital funding
from the Scottish Government, with the Moray Council providing £1.3 million of capital
and £1.6 million of revenue funding. 
How will it be delivered?
The Early Years STEM Project will be delivered in phases over a 10-year period,
beginning in 2024. 
Phase 1
2024 - 2025
Outreach Programme 
Elgin STEM Centre
Mobile Solution 
Phase 2
2026 - 2028
Environmental Sciences STEM Centre
Forres STEM Centre
Buckie STEM Centre
Phase 3
2029 – 2032
Ongoing Equipment Purchase
STEM Grant Scheme 
How will the benefits accrue?
To summarise how the benefits for this project will accrue it is easier to start at the end
point, which is a workforce trained and qualified in STEM disciplines. This workforce
will then be able to benefit from the opportunities of technological change and earn
salaries that reflect the skilled nature of their jobs. This in turn increases the level of
disposable income in the region and the well-trained workforce that makes Moray a
place where businesses look to locate and invest. These benefits can only be realised
10-15 years from the date the project begins as the learner will have to go through
further or higher education before entering the workforce. 
Throughout the life of the project, improvement in core curriculum for excellence
competencies will be monitored against the pre-intervention baseline to ensure the
intervention is responsive and dynamic to best practice and emerging trends. This will
be done using achievement and attainment data on an annual basis. Participation and
engagement levels will be monitored throughout the life of the project against key
performance indicators as set out in the benefits realisation plan. Qualitative measures
Page 38

Page 39

Page 27 of 142 
in the form of learner feedback surveys and ongoing engagement with young people
will provide assurance that the project is delivering against its objectives of raising
aspirations and promoting positive careers perceptions in young people.  
While these benefits are for the end goal of providing well paid meaningful
employment, the benefit to the individual of improved education throughout early years
to adulthood cannot be underestimated. By improving attainment at all levels young
people will be more self-confident, have higher self-esteem and improved
opportunities throughout their life. 
Is it financially sustainable?
Early Years STEM has sought to develop a sustainable delivery model for this project,
through development of strategic partnerships, management arrangements and site
selection that prioritises co-location, thereby reducing ongoing costs and supporting
staffing requirements. 
Capital spend will be on redevelopment of existing buildings that are owned or
managed by a service or community organisation. Operational costs for the spaces
are minimal, as the project team have agreed with delivery partners a nominal
contribution to utilities and management costs. 
Staffing costs present the greatest financial burden to Moray Council however these
posts are considered value for money and critical to the success of the project. Should
resource for staffing be removed at the end of the delivery period, activity undertaken
throughout project delivery, including workforce development and the creation of a
STEM learning network, the project would continue to deliver benefit.
Any short falls in funding will be the responsibility of the Moray Council as lead delivery
partner however additional funding will be sought in the form of in-kind contributions
from employers, external grant funding sources and income generated from events
and corporate hire of spaces.   
How does the project fit in the strategic landscape? 
At a local level, the project aligns with the following policies and strategies: 
• Moray Economic Strategy 2022
• Local Outcome Improvement Plan (LOIP)
• Moray Council Corporate Plan 2024
• Elgin City Masterplan
• Town Centre Improvement Plans
• Moray Education National Improvement Framework Plan
• Moray Council Parental Involvement and Engagement Strategy
• Moray Children Services Plan
Page 39

Page 40

Page 28 of 142 
And at a national level: 
• STEM Strategy for Training and Education 
• National Improvement Framework and Improvement Plan
• Hayward Review and the National Discussion on Education 
• Framework for Recovery and Acceleration Progress
• United Nations Convention on the Rights of the Child
• Learning for Sustainability: action plan 2023 to 2030
• National Strategy for Economic Transformation 
• National Planning Framework 4
• Just Transition 
• Future Skills Action Plan
• Realising the Ambition 
What else is happening in the region?
One of the largest developments currently taking place in Moray is the development
of the growth deal itself. This project is integral to the success of other projects within
the deal. The Manufacturing Innovation Centre for Moray (MICM) is looking to work
with businesses to help introduce new technology that will require STEM skills. The
Digital Health & Care Innovation (DHI) project is looking to pilot innovative technology
to revolutionise rural health care, again requiring STEM skills to implement and grow.
While there is uncertainty around the direction of the proposed Moray Advanced
Technology and Innovation Campus (MAATIC), it is anticipated that any alternative
proposal will focus on skills and employment.
The University of the Highlands and Islands STEM Outreach Programme is in delivery,
with a dedicated STEM Coordinator employed for Moray and working collaboratively
with Early Years STEM.  
The STEM Moray Strategy Group is working on development of an updated STEM
strategy for Moray, taking into consideration opportunities and investments associated
with Early Years STEM, Moray Growth Deal, and other partner developments. 
Alongside this and benefitting the Moray Growth Deal and the region is the £400 million
investment in RAF Lossiemouth that is bringing jobs and investment to the region and
enabling some of the growth deal projects.
The Early Years STEM project thus plays a pivotal role in bridging the gap between
industry and STEM skills in the Moray area. To fully benefit from the employment
opportunities created by the Moray Growth Deals investment, as well as other
economic activities in the area, a robust pipeline of talented young individuals with
aptitude in STEM fields is vital. 
Page 40

Page 41

Page 29 of 142 
What else needs to be done?
Architectural concepts have been developed for the first STEM centre at Elgin Library,
delivered as part of Phase 1 activity. These proposals set out key functional area
moves, and renovation plans for the building, necessary to create a dedicated space
within the building for STEM.  With approval of the FBC, planning consent and building
warrants will need to be obtained and a contractor appointed to undertake renovation
works as per the proposals. 
Site acquisition, including partnership agreements and leasing arrangements will need
to be finalised with the Leanchoil Trust and Wild Things. A feasibility study assessing
the viability of Milbuies as a preferred location for the Environmental Centre will be
commissioned following FBC approval. Consultation and change of land use is key
focus areas for this facility and will need to be considered throughout development. 
Legal support relating to subsidy compliance for phase 2 activity will be sought as
planning develops. Subsidy compliance is not applicable to phase 1 activity as all
funding packages are associated with Moray Council assets and resources. 
Other key work items include: 
• Development of a marketing and branding strategy
• Staff recruitment / Contract for Services
• Vehicle procurement and fit-out.
• Learning programme development
• Construction and installation
• Phase 2 site acquisition and planning
• Approval by Scottish Government of elements not sufficiently covered in this
Full Business Case, by annex submission
Page 41

Page 42

Page 30 of 142 
2. The Strategic Case 
Organisational overview
The case has been developed by the Moray Council in partnership with the University
of the Highlands and Islands (UHI), UHI Moray, Skills Development Scotland (SDS),
Developing the Young Workforce (DYW), Education Scotland (ES), SSERC, NHS
Grampian, Boeing, Gordon and MacPhail, and Aberdeen Science Centre (ASC). 
Representatives from each organisation, in collaboration with other identified
stakeholders, and in consultation with key user groups, have contributed to the scope
and focus of this evolving business case. 
The strategic context
The strategic drivers for this investment and associated strategies, programmes and
plans are contained in the vision for the Moray Growth Deal23.
“By the year 2030 Moray is a destination of choice, the area being known and
recognised as an outward facing and ambitious community with a thriving and
well-connected commercial base and an environment in which quality of life is
valued and supported.”
The vision for the Moray Growth Deal is built on four pillars: Connections; Business
Support, Skills & Employability; Moray the Place/Brand; and Moray’s Priority Business
Sectors.  Early Years STEM will deliver against the Business support, Skills &
Employability category, working collaboratively with project stakeholders, including
UHI Moray, MICM and DHI, in the development of skills and learning pathways, and
creating inspirational learning opportunities for families and young people that will
make Moray an attractive place to live and work. 
Business Strategy and Aims 
The project aligns specifically with the Scottish Governments STEM Strategy for
Education and Training that has four key aims. 24 
• To build the capacity of the education and training system to deliver
excellent STEM learning so that employers have access to the workforce
they need.
• To close equity gaps in participation and attainment in STEM so that
everyone can fulfil their potential and contribute to Scotland’s economic
prosperity.
• To inspire children, young people, and adults to study STEM and to continue
their studies to obtain more specialist skills. 
23 Moray Growth Deal Full Deal Document, 2021
https://www.parliament.scot/-/media/files/committees/rural-affairs-islands-and-natural-environment-
committee/moray-growth-deal-full-deal-document.pdf
24 STEM Strategy for Education and Training: third annual report, Scottish Government 2021
Page 42

Page 43

Page 31 of 142 
• To connect the STEM education and training offer with labour market need
– both now and in the future – to support improved productivity and inclusive
economic growth.
The Scottish Governments National Improvement Framework and Improvement
Plan,25 sets out key principles and priorities for improvement that the project will
deliver against, whilst also taking cognisance of ongoing national reform in the
education sector, including the Hayward review and the National Discussion on
Education.26
The project supports the Scottish Governments Framework for Recovery and
Accelerating Progress,27 which aims to support schools, local authorities, and others
across the education system to support educational recovery and increase progress
in improving outcomes for children and young people impacted by poverty. The
framework is developed in line with the United Nations Convention on the Rights
of the Child (UNCRC).28
The Scottish Governments Learning for Sustainability: action plan 2023 to 2030
29makes learning for sustainability a key driver in the future of Scottish Education and
is aligned with the projects KPIs in relation to outdoor learning. 
The project also helps to deliver against the policy programmes of Scotland’s
National Strategy for Economic Transformation30, namely
• To ensure that people have the skills they need at every stage of life to have
rewarding careers and meet the demands of an ever-changing economy and
society, and that employers invest in the skills employees they need to grow
their businesses.
The National Planning Framework 4,31 has a clear vision for Scotland’s spatial
principles, which also provide drivers for this investment:
• Just transition. We will empower people to shape their places and ensure the
transition to net zero is fair and inclusive.
• Conserving and recycling assets. We will make productive use of existing
buildings, places, infrastructure, and services, locking in carbon, minimising
waste, and building a circular economy. 
25 National Improvement Framework and improvement plan, 2024, The Scottish Government
https://www.gov.scot/publications/education-national-improvement-framework-improvement-plan-
2024/
26 All Learners in Scotland Matter – national discussion on education: final report, 2023
https://www.gov.scot/publications/learners-scotland-matter-national-discussion-summary-report/
27 27 Framework for Recovery and Accelerating Progress, 2023, Scottish Government. 
Scottish Attainment Challenge: framework for recovery and accelerating progress - gov.scot
(www.gov.scot)
28 A Summary United Nations Convention on the Rights of a Child, Unicef, 2022
https://www.unicef.org.uk/wp-content/uploads/2019/10/UNCRC_summary-1_1.pdf
29 Learning for sustainability: action plan 2023 to 2030, Scottish Government, 2023
https://www.gov.scot/publications/target-2030-movement-people-planet-prosperity/
30 Scotland’s National Strategy for Economic Transformation, 2022, Scottish Government
https://www.gov.scot/publications/scotlands-national-strategy-economic-transformation/pages/2/
31 National Planning Framework 4, Scottish Government, 2023
https://www.gov.scot/publications/scotlands-national-strategy-economic-transformation/pages/2/
Page 43

Page 44

Page 32 of 142 
• Local living. We will support local liveability and improve community health
and wellbeing by ensuring people can easily access services, greenspace,
learning, work, and leisure locally.
• Compact urban growth. We will limit urban expansion so we can optimise the
use of land to provide services and resources, including carbon storage, flood
risk management, blue and green infrastructure, and biodiversity.
• Rebalanced development. We will target development to create opportunities
for communities and investment in areas of past decline and manage
development sustainably in areas of high demand.
• Rural revitalisation. We will encourage sustainable development in rural
areas, recognising the need to grow and support urban and rural communities
together. 
The project also supports the Scottish Governments Just Transition 32Fund
outcomes: 
• Citizens, communities, and place: skills development, job creation and
investment in community-based infrastructure will strengthen local economies. 
• Jobs, skills, and education: initiatives will equip people with the skills and
knowledge needed to access highly technical and green careers. 
• Fair distribution of costs and benefits: industry-sponsored community
projects will share the benefits of STEM activities with local communities. 
• Business and Economy: creating a skilled, capable workforce in turn supports
a strong, and productive economy, creating further wealth and employment. 
• Adaptation and resilience: providing flexible training options help ensure the
workforce and economy are adaptable and responsive.
• Decarbonisation and efficiencies: suitable adaptation of the skill system will
contribute low-carbon investment and infrastructure, avoiding carbon 'lock-in.'
The project supports the Future Skills Action Plan33 vision that: Scotland’s highly
skilled workforce ensures we are an ambitious, productive, and competitive nation. 
At the local level the project aligns with the ambition of the Moray Economic
Strategy34 outcomes of increased qualification levels, business growth and skills
alignment. 
The Local Outcome Improvement Plan (LOIP) for Moray 35aims to increase skills
and pay levels in the area to lead to higher skilled employment, with KPIs measuring
qualification levels. 
32 Just Transition – A fairer, greener Scotland: Scottish Government Response, 2021, Scottish
Government
https://www.gov.scot/publications/transition-fairer-greener-scotland/
33 Future Skills: action plan, 2021, Scottish Government
https://www.gov.scot/publications/scotlands-future-skills-action-plan/
34 Moray Economic Strategy 2022, Towards Future Prosperity and Inclusive Growth
http://www.moray.gov.uk/downloads/file147200.pdf
35 Local Outcome Improvement Plan v2, Moray Community Planning Partnership
http://www.yourmoray.org.uk/downloads/file118306.pdf 
Page 44

Page 45

Page 33 of 142 
The Moray Council Corporate Plan 36 looks to create a step change in the regional
economy to enable inclusive economic growth, which this project will contribute to
through allowing young people to take up opportunities and participate fully in the
labour market. 
The project aligns with the vision of the Elgin City Centre Masterplan 37 and all
Town Centre Improvement Plans 38 to promote town centres and support their
vitality and viability.
The project will deliver against the priorities set out in the Moray Education National
Improvement Framework Plan 39 specifically in relation to raising achievement in
numeracy and around family learning. These plans have developed taking cognisance
of Local and National Education Strategies and priorities including: 
• Getting it right for every child (GIRFEC)
• Digital Learning and Teaching Strategy for Scotland
• Developing the Young Workforce (DYW)
• National Improvement Framework (NIF)
• Corporate Parenting Strategy and Pillars
• Raising Attainment Strategy and Toolkit
• Learning and Teaching Strategy
• Curriculum Strategy and toolkit
• Moray Improvement Groups
The project directly supports Realising the Ambition 40and Early Years Play
Strategy with activities and experiences designed in relation to child centred
pedagogical approaches. 
The project also delivers against the Moray Council Parental Involvement and
Engagement Plan (PIE) 41 particularly around STEM family learning. 
Moray Children’s Services Plan 42 lists key priority areas that this project will provide
contribution: 
• Overcoming challenges experienced by children with a disability or
neurodiversity. 
• Tackling child poverty 
36 Corporate Plan 2024, Moray Council
http://www.moray.gov.uk/downloads/file119976.pdf
37 Elgin City Centre Masterplan, 2021, Moray Council 
http://www.moray.gov.uk/downloads/file119976.pdf
38 Town Centre Improvement Plan, Moray Council 
http://www.moray.gov.uk/moray_standard/page_139997.html
39 Moray Education National Improvement Framework Plan 2021-2022, Moray Council Education 
http://www.moray.gov.uk/downloads/file138626.pdf
40 Realising the ambition: Being Me, Education Scotland, 2020
https://education.gov.scot/media/3bjpr3wa/realisingtheambition.pdf
41 Our Moray Standard – Supporting All Learners 2022-2028 Strategy, Moray Council Education
http://www.moray.gov.uk/downloads/file149016.pdf
42 Moray Children’s Services Plan 2023-36, Moray Community Planning Partnership
http://www.moray.gov.uk/downloads/file150784.pdf
Page 45

Page 46

Page 34 of 142 
• Improving the mental and emotional wellbeing of children, young people and
their families Keeping children and young people safe 
• Strengthening family support 
• Improving outcomes for our looked after and care experienced children and
young people.
The project also aligns with the aims of the Moray Council Climate Change Strategy
2020-2030 43 to: 
• Achieve a carbon neutral Council by 2030 with an on-going reduction in
greenhouse gas emissions from the Council area, 
• Work to retain, protect, and enhance biodiversity across Moray.
• Work pro-actively with the wider community to promote and facilitate local
action on Climate Change
Inclusive growth44, which is a key strategic focus of the Scottish Government and Moray’s
Economic Strategy will be considered in all Early Years STEM project decisions. 
Investment objectives 
The investment objectives for Early Years STEM are based on findings supporting
the strategic case. 
Investment Objective 1 – To increase the availability of STEM opportunities
for younger people, through the creation of experiential STEM learning hubs
delivering upwards of 9000 engagements per annum by 2032.  
Investment Objective 2 - To increase participation and attainment in STEM
subjects at secondary level by 8%, thereby encouraging uptake at further and
higher education and ultimately increasing the STEM skills level in Moray by
2042. 
Investment Objective 3 - To ensure there is equality of opportunity in STEM
education across Moray, ensuring all students aged 3-8 are engaged with the
curriculum at least once per annum no matter their location, and increasing
female participation in STEM subjects at secondary level by 10% by 2042. 
Investment Objective 4 – To increase the skills level of early year’s
practitioners and primary teachers in the delivery of STEM disciplines, with an
increase of 32 STEM champions in settings by 2032. 
Investment Objective 5 – To strengthen science capital within communities
through the provision of 10 public engagement events per annum, thereby
encouraging parental engagement, inter-generational learning, and raising the
awareness of STEM related careers by 2032. 
Investment Objective 6 – To develop new forms of delivery through multi-
agency collaboration and inter-disciplinary working, engaging 400 students
aged 3-12 in partner led programmes and events, and increasing the number
of industry and community STEM Ambassadors in Moray by 50% by 2032. 
43 Climate Change Strategy 2020-2030, Moray Council
http://www.moray.gov.uk/downloads/file136442.pdf
44 Inclusive Growth: what does it look like? Scottish Government 2022
https://www.gov.scot/publications/inclusive-growth-look/
Page 46

Page 47

Page 35 of 142 
Existing Arrangements
Skills Shortage and the Moray Economy
The UK economy is changing. According to research from the World Economic Forum
Assembly,45 labour market transformations are being driven by technological
breakthroughs, coupled with the shift to green energy and the broader application of
environmental, social and governance standards within organisations.  The fastest
growing roles are driven by technology, digitalization and sustainability with Artificial
Intelligence and Machine Learning Specialists at the top of the list of fastest growing
jobs, followed by Sustainability Specialists, Business Intelligent Analysts, and
Information Security Analysts. Renewable Energy Engineers, and Solar Energy
Installation and System Engineers are relatively fast-growing roles, as economies shift
towards renewable energy. The fastest declining roles according to the World
Economic Forum are in administrative and clerical roles as well as traditional security,
factory, and commerce roles. 
These findings are consistent with labour market trends in Scotland’s Economy.
Research conducted by Skills Development Scotland46 indicate job displacement
caused by advances in technological development. Forecast employment change in
Moray by industry from 2026-2033 shows significant contraction in the manufacturing
sector, as new technologies and production methods will allow the sector to produce
more, but with fewer workers. Across all sectors, there will be a shift in the types of
roles and expectation of skills, as new ways of working and technologies are
introduced to the workplace. 
Process, Plant and Machine Operatives are in the fast-declining roles and will be
replaced by automation and machine learning specialists, both STEM based
occupations.   
45 World Economic Form Future of Jobs Report 2023
https://www3.weforum.org/docs/WEF_Future_of_Jobs_2023.pdf 
46 Regional Skills Assessment Moray Growth Deal 2023, Skills Development Scotland
https://www.skillsdevelopmentscotland.co.uk/media/4jakvfxz/rsa-growth-deal-report-moray.pdf
Page 47

Page 48

Page 36 of 142 
Figure 5 Employment by industry Moray Economy vs Scotland, 2023, Nomis web
As indicated in the in Figure 5, 16% of employment in Moray comes from
manufacturing, equating to some 6000 jobs47. A report by Oxford Economics48 stated
that in the EU28, 2 million manufacturing jobs are at risk from automation by 2030.
This would equate to 6.67% of jobs lost over a ten-year period. The Highlands and
Islands can be viewed as particularly vulnerable due to its current relative lack of
automation.
While roles are likely to evolve rather than disappear, STEM related skills and higher
qualification levels will be required to access these types of jobs. Additionally, the
Moray Growth Deal MICM project will deliver significant investment in the
manufacturing sector and create opportunities for skilled employment. It is therefore
essential to embed STEM learning now, to create a robust pipeline of talented young
individuals with aptitude in STEM fields.    
As indicated the regional skills assessment for Moray, there is forecast future long-
term demand in occupations with increasing reliance on STEM based skills. 
47 Nomis official census and labour market statistics 
https://www.nomisweb.co.uk/reports/lmp/la/1946157424/report.aspx
48 https://www.oxfordeconomics.com/wp-content/uploads/2023/07/HowRobotsChangetheWorld.pdf 
0%2%4%6%8%10%12%14%16%18%20%
Industrial Make up of the Moray Economy v Scotland 2022
Businesses (Moray) Businesses (Scotland)
Page 48

Page 49

Page 37 of 142 
Figure 6 Forecast total requirements by occupation in Moray (2026-2033) Skills Development Scotland
Employers are continuing to report skills shortages in the labour market. According to
the Open University Business Barometer49, in 2020 there was estimated to be a skills
shortage in nearly 62% of business in Scotland. The Scottish Employer Skills Survey
(ESS) provides information on the skills challenges faced by employers in Scotland
and is conducted on a regional level50. While no specific data is available for Moray,
data gathered for the Highlands and Islands region indicate that 16% of vacancies
were due to skills shortage, and 15% of employers reporting skills gaps within their
organisations. Employers reported complex analytical skills, digital, and operational
skills as the predominant development areas. 
Moray needs to improve its skills level if it wishes to be a competitive and attractive
region that attracts inward investment and talent. In common with other regions in the
Highlands and Islands, Moray has a youth depopulation issue. To reverse this, high-
quality jobs must be available.
The Moray economy has lower wage levels than in Scotland, with full time workers in
Moray earning 10% less than their Scottish peers per hour on average. The gap
widens further when all full time and part time jobs are included, the average annual
wage in Moray £26,750 compared to £29,842 in Scotland.51 The gender pay gap 
49 Open University Business Barometer 2021
https://www5.open.ac.uk/business/barometer-2023
50 Scottish Employer Skills Survey 2020
https://www.gov.scot/news/scottish-employer-skills-survey-2020/
51 Annual Survey of Hours and Earnings (ASHE) 2023 ONS
https://www.nomisweb.co.uk/reports/lmp/la/1946157424/report.aspx
Page 49

Page 50

Page 38 of 142 
remains a serious issue, the Moray Economic Strategy 2022 reporting 16% in Moray
compared to the Scottish average of 13%.3 
Moray also has a lower proportion of people employed in highly skilled occupations
compared to the national level, with 35% in Moray at SOC 1-3 compared with 44% in
Scotland, and a higher concentration of employment in sectors with relatively low
wages. More than 55% of Moray’s jobs were in manufacturing, retail, hospitality, public
administration, social care, and health, compared to the national figure of 45%. 65%
of Morays residents aged 16-64 had a qualification at Higher level or above compared
to 68% nationally, and the share of residents with a degree or same level professional
qualification was 24% compared to 31% for Scotland.26 As indicated in the Regional
Skills Assessment conducted by Skills Development Scotland in 2023, jobs of the
future are going to require higher-level qualifications, with 43% of the Moray regions
greatest requirement at SCQF levels 7-10. 52
Employment in STEM is highly segregated based on gender and encouraging more
people to enter STEM related careers depends on changing the perceptions of
appropriate career choices for men and women.  Stereotypes about what is a ‘man’s
job’ and what is a ‘woman’s job’ are affecting the chosen career paths and these
stereotypes are often established at a very young age. 
The 2013 ASPIRES report by Kings College London revealed that girls are less likely
to aspire to a science career, even though a higher percentage of girls than boys rate
science as their favourite subject. The report also indicates that if a child does not
express interest in STEM by age 10 are unlikely to do so later in life. 53
Research has identified that children as young as six report gendered differences in
relations to levels of interest, confidence, and self-efficacy regarding STEM learning,
and children of that age already associate reading with girls and mathematics with
boys54. Stereotypes about cultural and social fit with STEM subjects, as well as the
ability to undertake them, influence girls’ orientation to STEM in early childhood that
persists into the middle years. Research also suggests that girls are socialised away
from science at very early ages through parental guidance and micro-pedagogical
practices in schools, for example with parents of young children much more likely to
explain science topics to boys than girls.
Raising Achievement and Improving Outcomes 
The Scottish Governments National Improvement Framework (NIF) and improvement
plan 55 sets out the vision and priorities for Scottish education that have been agreed 
52 Regional Skills Assessment Moray Growth Deal 2023, Skills Development Scotland
https://www.skillsdevelopmentscotland.co.uk/media/4jakvfxz/rsa-growth-deal-report-moray.pdf
53 ASPIRES Young People’s science and career aspirations, age 10-14, Kings College London 2013
https://kclpure.kcl.ac.uk/ws/portalfiles/portal/64130521/ASPIRES_Report_2013.pdf
54 STEM in ECE: Key Findings from Research in the Field, 2019, University of Sheffield
55 National Improvement Framework and improvement plan, 2024, The Scottish Government
https://www.gov.scot/publications/education-national-improvement-framework-improvement-plan-
2024/
Page 50

Page 51

Page 39 of 142 
across the system, and the national improvement activity that needs to be undertaken
to help deliver those key priorities. The Cabinet Secretary for Education and Skills
notes that nationally, being out of school and early years settings during the pandemic
has had a profound impact on our children and young people, where there are many
societal and socio-economic factors that are out with the control of schools and Early
Learning and Childcare settings, but which have a significant impact on learning and
achievement. 
The Scottish Government and local authorities remain committed to working together
in realising the ambition of achieving equity and excellence for all Scotland’s children
and young people. The International Council of Education Advisors (ICEA) view the
national discussion and Hayward review of assessment as providing the opportunity
for fresh and innovative ideas for improvement. Following key national review of the
National Improvement Framework (NIF) 2023 and in line with findings of wider national
reviews included in Professor Ken Muir’s Report 56, and the National Discussion on
Education57, focus is now on achievement rather than attainment, where this was seen
to be more in line with the four capacities of Curriculum for Excellence where we look
to develop successful learners, confident individuals and effective contributors. The
key drivers for improvement are considered within the NIF as: 
• Schools and Early Learning and Childcare (ELC) Leadership
• Teacher and practitioner professionalism
• Parent/carer engagement and family learning 
• Curriculum and assessment 
• School and ELC improvement
• Performance Information 
In Moray, Strategic Education Meetings focus in on these drivers, and the current
Education Strategic Plan focuses on the following core improvement areas as detailed
in the Moray Education: National Improvement Framework Plan (NIF) 202458: 
• Curriculum
• Reviewing Additional Support Needs
• Learning, Teaching, and Assessment
• Strengthening leadership and empowerment 
Significant efforts have been made across Moray Education in recent years to build
and maintain improvement in attainment at Broad General Education Level. Among
these actions is the development of Moray Improvement Groups, a collaborative effort
across agencies to support revised educational strategies.  Central officers lead on
the development of core progressions and learning pathways across curriculum areas, 
56 Putting learners at the centre: towards a future vision for Scottish Education, 2022, Professor Ken
Muir
https://www.gov.scot/publications/putting-learners-centre-towards-future-vision-scottish-education/
57 All Learners in Scotland Matter – national discussion on education: final report, 2023
https://www.gov.scot/publications/learners-scotland-matter-national-discussion-summary-report/
58 Moray Education: National Improvement Framework Plan, 2023-2024, Moray Council. 
Performance and Statistics - Moray Council
Page 51

Page 52

Page 40 of 142 
including STEM. In line with the Scottish Governments Framework for Recovery and
Accelerating Progress59, Core Stretch Aims have been set out in relation to
achievement and attainment. 
The authority has seen significant improvement in attainment levels in recent years,
as Education has implemented a range of key strategic drivers, priorities and
improvements as outlined in the Moray Education National Improvement Framework
Plan 2023-2024. However, further work is required to raise and maintain attainment
levels in Moray in line with or above the national average. 
Data obtained from Moray Councils Public Performance Report60 and shown in Figure
7, highlights that in 2023, 75% of Moray children across primary 1, 4 and 7 achieved
the expected levels in numeracy, while the national average is 80%. Also in 2023, 87%
of Moray children at third level and 58% at fourth level achieved the expected levels
in numeracy, whereas the national average is 90% and 63% respectively. 
Figure 7 Moray Achievement of a Level - All Levels, Public Performance Report for Primary and Secondary Schools, 2023
Numeracy is a basic enabler to achieving qualifications in STEM and if children are
behind in this by the time they reach secondary school, then this makes attainment in
line or above the Scottish average ever more challenging. While there has been
significant improvement in achievement levels in numeracy from 2019 to 2023 (the
gap closing from 14% to 5%), further work is required to ensure Moray children perform
at the same level as those nationally.    
Performance data highlights a consistently lower rate of attainment at SCQF level 6 in
Moray than in Scotland from 2021 to 2023, as highlighted in Figure 8. In 2023, 45% of
Moray students achieved 3 or more passes compared to the national average of 52%,
and 29% achieved 5 or more passes compared to the national average of 39%.60 
59 Framework for Recovery and Accelerating Progress, 2023, Scottish Government. 
Scottish Attainment Challenge: framework for recovery and accelerating progress - gov.scot
(www.gov.scot)
60 Public Performance Report for Primary and Secondary Schools, School Session 2022/23, Moray
Council Education 
http://www.moray.gov.uk/downloads/file154769.pdf
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
P1, P4, P7 Combined Third Level Fourth Level
Moray
Moray Education Achievement of a Level 2023 - Numeracy
Moray
Scotland
Page 52

Page 53

Page 41 of 142 
Figure 8 Percentage of S4 attaining, Public Performance Repot for Primary and Secondary Schools 2023
According to 2023 Scottish Qualification Authority (SQA) attainment statistics, and
shown in Figure 9, Moray’s students are less likely to attain in STEM related subjects
than in Scotland, with the percentage of Moray students attaining grades A-C at SCQF
level 5 (National 5) significantly lower than those in Scotland. 61 
Statistics also show a downward trend in STEM attainment in Moray from 2021 -2023,
as shown in Figure 10. 
Figure 9 STEM Subject Attainment in Moray versus Scotland - National 5 – Scottish Qualification Authoity Statistics 2023 
61 Attainment Statistics, Scottish Qualification Authority, 2023
https://www.sqa.org.uk/sqa/105123.html
0%
10%
20%
30%
40%
50%
60%
Moray Scotland Moray Scotland
3 or more passes
at SCQF 6
3 or more passes
at SCQF 6
5 or more passes
at SCQF 6
5 or more passes
at SCQF 6
Moray Attainment versus Scotland  
SCQF 6 (Higher)
2021
2022
2023
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Application of
Mathematics
Biology
Chemistry
Computing
Science
Engineering
Science
Graphic
Communication
Mathematics
Physics
STEM Subject Attainment Moray versus Scotland
2023 - SCQF 5 (National 5)
Moray
Scotland
Page 53

Page 54

Page 42 of 142 
Figure 10 Moray STEM Subject Attainment 2021-2023 - SCQF 5 - Scottish Qualifications Authority Statistics 2023
The impact of lower attainment levels is reflected in the number of children going into
positive leaver destinations post-secondary education. While the number of Moray
school leavers entering employment and further education remains above national
average, the number of Moray School leavers entering Higher Education falls
consistently below that of national peers. In 2023, 29% of Moray school leavers
entered employment compared to 27% nationally, whereas 33% of Moray school
leavers entered higher education compared to 40% nationally. As indicated in the
Regional Skills Assessment conducted by Skills Development Scotland in 2022, jobs
of the future are going to require higher-level qualifications, with 44% of the Moray
regions greatest requirement at SCQF levels 7-10. 62 
Figure 11 Moray positive leaver destinations 2023, Moray Education Statistics 
62 Public Performance Report for Primary and Secondary Schools, School Session 2022/23, Moray
Council Education 
http://www.moray.gov.uk/downloads/file154769.pdf
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Application of
Mathematics
Biology
Chemistry
Computing Science
Engineering Science
Graphic
Communication
Mathematics
Physics
Moray STEM Subject Attainment
2021-2023 - SCQF 5 (National 5)
0%10%20%30%40%50%60%70%80%90%100%
Higher Education
Further Education
Employment
Voluntary Work
Training
Personal Skills
Development
Positive Destination
Moray Positive Leaver Destinations 2023
Moray
National
Page 54

Page 55

Page 43 of 142 
Creating more appeal for STEM related jobs is important to facilitate the evolution of
skills required by the future jobs market, and to ensure Moray is resilient in the future.
The Moray Growth Deal will see significant investment in the local economy, creating
future high-level jobs in key sectors of Digital Health, Aerospace, Renewable Energy
and Manufacturing. Raising achievement and improving outcomes is important to
ensure our young people have the necessary skills to access these jobs. 
As evident from the trends in attainment levels from broad education through to senior
phase and into leaver destinations, for positive attitudes to be embedded in terms of
STEM, this culture change needs to begin at a pre-school age and then be sustained
through the young person’s progression through education. 
Business Needs Current and Future 
Early Intervention
There has been significant research undertaken in recent years into what factors
influence a child’s engagement with STEM. The 2013 ASPIRES report by Kings
College London is a significant and long-term study into young people’s science and
careers aspirations from age 10 to 1463. The report found that young people’s attitudes
towards STEM are consistent from age 10 to 14, and that those who do not express
interest by age 10 are unlikely to develop STEM aspirations by the age of 14. The
report acknowledged that STEM engagements must begin before secondary level and
highlighted the importance of primary STEM education. 
Indeed, there is growing scientific consensus about the importance of implementing
STEM education at a much younger age. A 2017 report by the Joan Ganz Cooney
Centre demonstrates the importance of grounding STEM Education in early
childhood64. Young children possess a natural curiosity of the world around them and
are already starting to grasp the fundamental concepts about science and the natural
world through play and exploration. Implementing STEM education at an early stage
encourages the development of key skills relating to problem solving, trial and error
and critical thinking skills, and can lay the groundwork for a deeper understanding of
difficult concepts at a later stage. 
A growing number of studies show a correlation between early experiences with STEM
subjects and later success in those subjects or in school generally. The 2015 report
titled Transforming the Workforce for Children Birth through Age 865 warned that
without such education starting and continuing throughout the early years, many 
63 ASPIRES Young People’s science and career aspirations, age 10-14, Kings College London 2013
https://kclpure.kcl.ac.uk/ws/portalfiles/portal/64130521/ASPIRES_Report_2013.pdf
64 STEM Starts Early: Grounding Science, Technology, Engineering and Math Education in Early
Childhood, Joan Ganz Cooney Centre, 2017
https://joanganzcooneycenter.org/wp-content/uploads/2017/01/jgcc_stemstartsearly_final.pdf
65 Transforming the Workforce for Children Birth Through Age 8: A Unifying Foundation 2015, Institute
of Medicine and National Research Council
https://www.fcd-us.org/wp-content/uploads/2016/10/IOMNRCFullReport2015.pdf
Page 55

Page 56

Page 44 of 142 
children will be on a trajectory in which they will find great difficulty catching up to their
peers.  The report also states that children who engage in scientific activities from an
early age develop positive attitudes towards science, which also correlate with later
science achievement, and they are more likely to pursue STEM expertise and careers
later. 
Encouraging an interest in STEM in early education, and sustaining that interesting
throughout a learner’s school journey, such that they have the necessary skills and
aspirations to pursue a career in STEM related fields, is key to developing a skilled
workforce that meets the future needs of employers.  While there is no single approach
that can be taken to adequately prepare today’s children to enter tomorrow’s
workplace, the foundation work is already being put in place in Moray that this Early
Years STEM initiative can further build on.  
In line with the Early Intervention approach taken across wider services in Moray,
STEM learning activities will be initiated at the Early Learning and Childcare (ELC)
stage. This acknowledges that to increase attainment in STEM we will need engage
with children in the early years (ages 3 – 8) setting to generate interest in the STEM
curriculum once the children are older.  To do this requires a multi-pronged approach
beginning before children start school and sustained through primary and secondary
school education levels. 
The primary target audiences are therefore: 
• Early Learning & Childcare Settings
• Childminders and Home Educators 
• Primary School Groups (P1-P4)
The secondary target audiences are: 
• Primary Schools Groups (P5-7)
• Secondary School Groups 
• Families, Employers, and the Wider community 
While work in Early Learning and Childcare (ELC) is further developing, a good start
has been made with the implementation of Talking Tubs to stimulate discussion about
sector specific vocations, including those STEM related. This links to early work with
practitioners around gender imbalance training that ties in with the child centred
pedagogy approach. Early Years STEM, through investment in training, resources,
and creation of specialist learning environments, will further enhance the awareness
of STEM related careers in early year’s settings.  
Outdoor learning continues to be a focus for ELC settings in Moray, with key initiatives
developed in recent years promoting STEM and learning for sustainability through
child centred pedagogical approaches. The Outdoor Play and Learning Toolkit,
developed in response to COVID-19 restrictions, provides ELC settings with the tools
and training to venture into the outdoors with confidence. The ELC Moray STEM in the
Outdoor Project, delivered with the support of grand funding from Education Scotland,
saw Enhanced Professional Learning Opportunities for ELC Practitioners in Moray,
Page 56

Page 57

Page 45 of 142 
with 14 STEM Champions from nursery settings participating in formal training
sessions with subject matter experts, with the aim of disseminating and embedding
the learning within each cluster. 
With increasing focus on climate change and the shift to green energy, the launch of
the LfS action plan66, and the Moray Councils commitment to achieving net zero by
2030, creating more opportunities for outdoor learning, environmental education and
learning for sustainability has never been more important.  Early Years STEM will
address this challenge through the creation of a specialist outdoor learning facility and
outreach programme, with a focus on environmental education and learning for
sustainability. 
Overcoming Barriers to Engagement
While there is increasing focus on STEM education for young people, both at a national
and local level, there persists significant barriers that prevent participation in STEM
activities. The 2022 report by Ekosgen prepared on behalf of Education Scotland
presents key findings relating to the Structural Barriers to STEM Engagement.67
Barriers identified that are within control of the local authority or Regional Improvement
Collaborative include: 
• Schools’ budgets and inconsistency of available resources across regions,
local authorities, and schools. 
• Cross local authority knowledge exchange is still largely dependent on
enthusiasm of individual STEM practitioners and leads.
• There needs to be increased focus on STEM and gender awareness practice
in School Improvement Plans where currently there is a mixed commitment. 
• Science transition activity from primary to secondary school needs to improve
with lack of resource and limited teacher time cited as key barriers. 
• Building capacity, confidence and skills of practitioners is an ongoing need with
CLPL and industry exposure highlighted as key areas.
• Lack of STEM resources is constraining STEM teaching as well as the
availability of flexible spaces within schools for Inter Disciplinary Learning (IDL).  
• Flexibility with planning and timetabling and a silo approach to curriculum and
lesson development is limiting the impact that IDL can have. 
• STEM Ambassadors and Young STEM Leaders are a valuable tool in
promoting STEM however are not yet having the reach and impact intended. 
• There needs to be stronger links between schools and partner organisations,
in particular, Developing the Young Workforce (DYW), SSERC, colleges, Skills 
66 Learning for sustainability: action plan 2023 to 2030, Scottish Government, 2023
https://www.gov.scot/publications/target-2030-movement-people-planet-prosperity/
67 The Structural Barriers to STEM Engagement Final Report for Education Scotland, 2022, Ekosgen
https://education.gov.scot/media/axpjte2j/ekosgen-structural-barriers-to-stem-engagement-year-3-
report-exec-summary-nov-2022.pdf
Page 57

Page 58

Page 46 of 142 
Development Scotland (SDS) advisers, Energy Skills Partnership (ESP),
regional STEM partnerships etc. 
Critical to the success of this project and indeed education reform, is putting the voice
of the learner at the centre. Included in the National Discussion on Education final
report 68 are key themes concerning learning, obtained by surveying learners and the
influential systems in their life. Concerning learning, key themes include: 
• Cultivating joy and the love of learning where learning takes place in a range of
settings and approaches, including the importance of play and outdoor learning
for all ages.
• The need for a shift from progression based on age and stage of schooling, to
flexible pathways and supported transitions that meet the developmental needs
and interests of children throughout their early years and school experience.
• Digital learning must be at the core of Scottish education so that all learners in
Scotland have choice, opportunity, and security in their lives, both now and in
the future 
• “I prefer to learn by doing practical things. Using real objects makes things stick
in my memory longer. I love Science because it’s very practical and fun”-
learner.
These findings are consistent with attitudes in Moray. There has been significant
engagement with parents, pupils and education staff, as the project has sought to
identify challenges, opportunities, and to obtain feedback on solutions proposed.
Engagement methods include: one on one and group consultations; facilitated focus
groups and workshopping exercises; attendance at ASG and head teacher meetings;
school and ELC classroom visits; public events and STEM taster sessions: and
feedback obtained from STEM surveys and feedback forms. Engagement survey
examples are included in Appendix 12. 
To date, 
• 140 education staff have been consulted throughout project development,
including ELC practitioners, childminders, and primary and secondary teachers.  
• 253 children have been engaged, including responses from pupil surveys,
classroom visits and STEM workshops. 
• 109 parents have been consulted through public engagement events, STEM
taster sessions and feedback from targeted surveys. 
Across all mediums, education staff generally agreed the following:
• While STEM learning is a priority in most settings, issues surrounding staff
time, budgeting constraints, and competing priorities limit the extent of STEM
engagement. 
68 All Learners in Scotland Matter: The National Discussion on Education, 2023, Scottish Government
https://www.gov.scot/publications/learners-scotland-matter-national-discussion-summary-report/
Page 58

Page 59

Page 47 of 142 
• Knowledge and confidence in delivering STEM subjects as well as the
awareness of CLPL opportunities, and the ability to access them, is a key
issue.  
• Embedding STEM within the curriculum will have the greatest impact with
support for a science progression. 
• Cost of transportation prevents settings accessing STEM learning opportunities
outside of the school environment.
• Lack of STEM resources and equipment is a barrier. Schools participating in
SSERC CLPL training have greater access to resources however, these are
not sufficient to support delivery to a full class. 
• Practitioners would like opportunities to experience STEM in relation to the
world of work and engage with local industry. While Developing the Young
Workforce (DYW) and Skills Development Scotland (SDS) are actively
engaging with students at secondary level, primary and nursery settings are not
seeing the same level of engagement. 
Parents have indicated a growing desire to engage with STEM learning, however, cite
lack of opportunity as a barrier to participation. The common answer when asked how
families currently access STEM learning in Moray, was through events delivered by
the CLD teams, as well as those offered in museums throughout the region. Parental
engagement is a subject of continued focus within Moray Council Education and while
there is increasing opportunity for parents to engage with STEM in school settings,
further work needs to be taken to embed this approach. 
Common answers when asked what type of STEM opportunities audiences would like
to see include outdoor learning, activities with a focus on renewable energy and a
“science centre type experience.” 
Science Centres have been long been known as the focal point within a community
for STEM engagements, providing opportunities for schools and families alike to
participate in STEM activities and delivering outreach programmes within localities.
Aberdeen Science Centre is the closest of these institutions to Moray, however with a
2-hour commuting time from the centre of Moray; schools find it incredibly challenging
to engage with this kind of high quality, inspirational experience. 
Technological advances and the impact of COVID-19 has increased the availability of
digital learning opportunities, however, with a large proportion of Morays learning
estate in remote locations, access to the necessary digital infrastructure limits
participation. The final threat to the skills make-up of the region is therefore rural in
nature.  Children in Moray need to have access to the same type of high-quality
learning experiences as their peers out with Moray. 
There is a degree of inequality of opportunity due to the rural nature of the region.
Many of the manufacturing businesses in Moray are in rural regions and are the most
significant employer in that locality. While these employers give considerable career
opportunities to their local communities, children need greater awareness of the
Page 59

Page 60

Page 48 of 142 
variety of opportunity across Moray as a whole, to prevent limited opportunity in their
local environment affecting attitudes towards future potential careers. In Speyside for
example, school settings have been particularly successful in connecting with
employers in their local area, however the children surveyed expressed a desire to
see jobs in other parts of Moray. 
Collaborative Approach and Partnership Working
Addressing these challenges is a complex endeavour and responsibility cannot lie on
the Moray Council and Education Sector alone. Raising the aspirations of young
people in STEM and giving them the skills and confidence to pursue STEM subjects
throughout education and into employment, relies on a coordinated, cohesive effort
within the whole STEM ecosystem.  
In line with Moray’s STEM Strategy for Education, significant efforts have been made
in recent years to raise the profile, knowledge and understanding of STEM subjects,
both in education settings and through delivery of partner and employer initiatives
throughout the region.  
The Moray Skills Pathway, developed in partnership between the Moray Council,
Developing the Young Workforce (DYW), Moray College UHI and Skills Development
Scotland (SDS), and working with employers, set out to develop a clear route for
children and young people from early years up to S6 to engage with the world of work
and develop enterprise skills. While this is no longer an active strategy within Morays
Education Sector, the core principles and innovative approach to curriculum continues
with the development of the Moray Improvement Framework Plan and Moray
Improvement Groups. 
Early Years STEM will work collaboratively with key delivery partners within Morays
Education Sector, as well as local employers and other Moray Growth Deal Projects
such as MICM and DHI, to build capacity within the education system and deliver
learning opportunities that are dynamic and flexible in response to the evolving
priorities within the sector. 
Capacity and financial pressures continue to exist within the Moray Council and among
partners, however the commitment to deliver high quality learning opportunities to our
young people has not changed.  While the changing economic climate has led to
partners scaling back large in person events, local outreach initiatives, national STEM
challenges and meet the expert programmes continue to be offered to young people
in Moray, particularly in the late primary to early secondary age bracket. 
Early Years STEM seeks to collaborate with partners to deliver a coordinated and
cohesive offer that maps STEM activity in the region, addresses the gaps in STEM
provision and creates new and exciting opportunities for children and families to
engage with STEM learning. This work has already been initiated through the
implementation of a STEM Moray Steering Group, focused on development of an
updated STEM Strategy for Moray and development of a STEM learning Ecosystem.
Page 60

Page 61

Page 49 of 142 
Key members of the group include Moray Council, UHI Moray, Royal Air Force (RAF),
Skills Development Scotland (SDS), Science Skills Academy, SSERC, Developing the
Young Workforce (DYW), Techfest and STEMOVATORS. 
Increasing Science Capital across the STEM Ecosystem
The ecological systems model, first suggested by Urie Bronfenbrenner in 1977 and
depicted in figure 12, suggests that children develop within nested systems of
influence, with the child at the centre.69 
Figure 12 Ecological Systems Model
The microsystem refers to a child’s immediate environment and relationships, and
include the home, the school classroom, child-care of after-school programme,
museums, science centres and any other local community setting, and of course, the
people and experiences within those settings. The mesosystem acknowledges the
relationships between the microsystem environments, for example the ways that the
child’s schooling affects his or her home life and vice versa. The exosystem includes
the societal structures and institutions that do not directly contain the child but can
directly or indirectly affect him or her—for example, government policies and the
research that spurs those policies. Finally, the outermost layer, the macrosystem,
consists of the cultural frames, paradigms, values, and models that shape the
environment within which the child learns.
The Ecological systems approach as outlined in the 2017 Study by the Joan Ganz
Cooney Centre70, acknowledges that integrating STEM learning into early childhood 
69 STEM Starts Early: Grounding Science, Technology, Engineering and Math Education in Early
Childhood, 2017, Joan Ganz Cooney Center.
https://joanganzcooneycenter.org/wp-content/uploads/2017/01/jgcc_stemstartsearly_final.pdf
70 STEM Starts Early: Grounding Science, Technology, Engineering and Math Education in Early
Childhood, 2017, Joan Ganz Cooney Center.
https://joanganzcooneycenter.org/wp-content/uploads/2017/01/jgcc_stemstartsearly_final.pdf
Page 61

Page 62

Page 50 of 142 
education requires urgent, well-coordinated, cross-sector work and made six key
recommendations:
1. Support parents to be STEM guides,
2. Improve teacher professional learning.
3. Build a sustainable and aligned system of high-quality early learning from birth
through 8. 
4. Use communications science to build will and public understanding.
5. Expand the availability of STEM “charging stations”.
6. Improve how research is funded and conducted.
Early Years STEM seeks to create a STEM learning ecosystem within the Moray
region, through the creation of specialist learning environments and experiences
(“charging stations”), access to training and resources (“professional learning”), and
the creation of a STEM learning network involving Moray Council staff, key delivery
partners, and volunteers from industry and the wider community.
The recommendations are consistent with key findings included in the 2022 Structural
Barriers to STEM Engagement Report conducted by Ekosgen on behalf of Education
Scotland and Scottish Government71, which speaks to the complexity of the learner
environment and the numerous influences facing the young person in their STEM
learning journey.  
The report also highlights the importance of introducing STEM learning pathways and
careers education from early years, through school, higher and further education and
on to the world of work and acknowledges the need for multi-agency collaboration and
inter-disciplinary working. Data drawn from interviewing students, parents and staff
showed that learners want their learning experience rooted in the real world with a
strong focus on job and work experience, and 59% of parents surveyed want more
opportunity for their children to work with businesses throughout their learning. 
In line with the Moray’s STEM Strategy for Education, significant effort has been made
in recent years to connect Moray’s education system with the world of work. Working
in partnership with Developing the Young Workforce (DYW) and Skills Development
Scotland (SDS), and utilising the SSERC STEM Ambassador Network, collaborative
approaches have been undertaken to connect local employers with schools, and raise
awareness of children, parents, and education staff to the wealth of career
opportunities that exist in Moray’s economy. The Moray Education Self-evaluation
2021 report summarises the significant progress made to date and commitment to
pursue collaborative opportunities within the Curriculum72.  Early Years STEM will 
71 The Structural Barriers to STEM Engagement Final Report for Education Scotland, 2022, Ekosgen
https://education.gov.scot/media/axpjte2j/ekosgen-structural-barriers-to-stem-engagement-year-3-
report-exec-summary-nov-2022.pdf
72 Moray Education Self Evaluation 2020-2021, Moray Council 2021
Page 62

Page 63

Page 51 of 142 
work closely with SDS and DYW to extend the reach of these engagements to younger
learners and their families.  
The concept of “Science Capital” has been gaining significant traction over the years
and was highlighted in the 2013 ASPIRES report by Kings College London.  The report
found that the chances of a young person going on to study STEM are greatly
influenced by the amount of “science capital” in the family. Science capital refers to
the science-related qualifications, understanding, knowledge, interest, and social
contacts at home. The report overwhelmingly found that children with a high amount
of science capital in the home are much more likely to aspire to a STEM career.  The
report also found that science capital is unevenly spread across societal groups and
those with higher levels of science capital tend to be middle class.
Parental Engagement has been the subject of continued focus within Morays
Education System in recent years, with increasing opportunities for parents to engage
with the curriculum and schools in general.  Parental influence, particularly in the early
years, is paramount to nurturing a child’s aspirations in STEM and to fully embed
STEM learning and change the way STEM is perceived in the region, there needs to
be a more focused and coordinated effort for families to engage with STEM, in both
formal and informal education settings. 
The concept of science capital extends beyond that of the home environment.  The
Enterprising Science partnership of BP, Kings College London and the Science
Museum Group identified eight key dimensions of science capital73:
1. Scientific literacy – A young person’s knowledge and understanding about
science and how science works. 
2. Science-related attitudes values and dispositions – the extent to which a
young person sees science as relevant to everyday life.
3. Knowledge about the transferability of science – understanding the broad
applications of science skills and that these can lead to a wide range of jobs. 
4. Science media consumption – the extent to which a young person watches
science related television, books, magazines and engages with science related
internet content.
5. Participation in out-of-school science learning contexts – how often a
young person participates in informal science learning contexts such as
science museums, science clubs, libraries etc. 
6. Family science skills, knowledge, and qualifications - the extent to which
a young person’s family have science-related skills, qualifications, jobs, and
interests.
7. Knowing people in science related roles - the people a young person knows
in their family, friends, peer, and community circles who work in science-related
roles. 
73 Science Capital Made Clear, Enterprising Science Partnership, 2015
Page 63

Page 64

Page 52 of 142 
8. Talking about science in everyday life – how often a young person talks
about science out of school with key people in their live
Building science capital is a challenging and complex endeavour. It means recognising
that improving science participation entails changes and challenges for the whole
STEM ecosystem and that there is no silver bullet. A science capital approach means
paying attention to the institutions, systems, and social relations within, and relies on
collaboration and partnership working. 
Science capital recognises the need for STEM engagement beyond that of the school
environment. Schools have traditionally been the place for children to develop
disciplinary thinking, however, schools are not the only place in a community where
education takes place; they exist within a community’s learning ecosystem. Schools,
businesses, science museums, libraries, and the home are settings that make up a
community’s learning ecosystem, and this subset of places is designed to support the
development of STEM disciplinary ways of thinking. 
These extended education contexts are an important and necessary part of the STEM
learning ecosystem as they provide opportunities to explore STEM content outside of
formal school settings and removes the academic pressure and fear of failure that can
contribute to STEM disengagement. They can also provide a space for educators and
facilitators to explore innovative pedagogical practices and child centred learning
opportunities, where traditional school settings may be less equipped to do so, due to
competing priorities and pressures. In addition, non-formal learning institutions are
known to be effective in engaging families with STEM activities, leading to
strengthening of science capital in families. 
STEM has seen a resurgence in Moray in recent years as communities recognise the
importance of STEM based learning across all ages and sectors. The Moray Councils
Library and Learning Centre team have been particularly successful in engaging
young people with STEM, through delivery of coding workshops, digital explorer’s
programmes, and the provision of STEM loan kits.  Similarly, the Moray Councils Adult
& Family Learning Team have made significant efforts to engage families with STEM,
through delivery of national programmes such as Multiply and even going into school
and nursery settings to deliver family focused workshops.  However, access to
environments, resources and training limits the extent to which teams can engage with
audiences. 
STEM learning opportunities extend beyond the local authority and education sector;
as local museums, discovery centres and community hubs also deliver STEM related
activities and experiences.  While these activities highlight the regions commitment to
learning and appetite for STEM Engagements, Moray needs a dedicated informal
STEM learning environment that can bridge the gap between schools, employers,
families, and the wider community.  
There is therefore a significant need in Moray to develop infrastructure aligned to the
needs of the STEM ecosystem that can support delivery of STEM pathways from early
Page 64

Page 65

Page 53 of 142 
years through to BGE, and facilitate parental engagement, inter-generational learning,
and community participation. 
Early Years STEM will invest in state-of-the-art facilities in community settings
throughout Moray. These spaces will offer core learning equipment and digital
infrastructure that will allow children, families, and the wider community of all ages to
engage with STEM. The environments will include interactive exhibitions and
experiences for self-led, child centred learning opportunities, thereby offering a
“science centre type experience” that can be delivered through Moray Growth Deal
funding and sustained within existing Moray Council resources. 
The facilities will also offer accessibility to community groups, STEM clubs and Moray
Council CLD teams to deliver STEM learning to audiences, including early years.
Employers, STEM Ambassadors and community volunteers will also be engaged to
deliver STEM learning within these facilities, where access to infrastructure has
previously limited these types of interactions. 
A dedicated team of STEM coordinators will be employed to manage and coordinate
activity associated with the STEM Network. This draws on the success of the Raising
Aspiration in Science pilot project (RAiSE) launched in Moray in 2016. The Wood
Foundation, Scottish Government and Moray Council jointly funded this 23-month
£160,000 project, with the primary expense being employing a Primary Science
Development Officer. The focus of the programme was to increase competence and
confidence in practitioners in the delivery of STEM curriculum.  
An external evaluation of the RAiSE programme was conducted by Glasgow
University at a national level and found that of those children involved with RAiSE 87%
had enjoyed more challenge and 77% had increased their STEM aspirations. 74 This
is a high impact for a relatively small project over a short timeframe and demonstrates
the significant impact specialist STEM staff can make.  However, the RAISE
programme also demonstrates the importance of being able to sustain this role over
an extended period.
Creating educational facilities that offers equitable access to education settings,
families, employers and the wider community, the Early Years STEM project aims to
create an ecosystem of STEM learning that encourages multi agency participation and
changes the way STEM is perceived in the region. 
Potential scope and service requirements
The options within these ranges are considered within the economic case.
Business scope and key service requirements 
74 Raising Aspirations in Science Education (RAiSE) Pilot Final Evaluation Report 2019, University of
Glasgow
https://www.thewoodfoundation.org.uk/wp-content/uploads/2019/05/RAiSE-evaluation-report-
finalised-.pdf
Page 65

Page 66

Page 54 of 142 
Minimum Intermediate Maximum
Potential
business scope 
One central
provision serving all
Associated School
Groups (ASG)s in
Moray.
Development of a
centrally located
Moray STEM
Centre. A flexible
learning space with
indoor and outdoor
facilities, core and
bespoke learning
equipment and a
programme of
learning applicable
to the target
audience. 
A bespoke offering
dependant on need
and geography.
Facilities developed in
targeted locations
across Moray.
Flexible indoor and
outdoor spaces with
core and bespoke
learning equipment
and a programme of
learning applicable to
the target audience. A
robust outreach
offering including a
mobile solution
extending the offer
into all ASGs in
Moray. 
A provision in each
Associated School
Group (ASG) in
Moray. Eight ASG
STEM Hubs
developed utilising
existing council and
partner space.
Flexible learning
spaces with core
learning facilities
and equipment and
a programme of
learning suitable to
the needs of
geography of each
ASG. A mobile
solution with
bespoke equipment
bringing the benefits
of a science centre
to Moray 
Key service
requirements
Identify centrally
located premises,
refurbish to a high
standard, fit out with
facilities, furniture,
and bespoke
learning equipment. 
Recruitment of a
small team to
deliver centrally
from Moray Council. 
Identify suitable
premises in targeted
locations across
Moray. Refurbish and
fit out with facilities
and bespoke learning
equipment. Purchase
of a vehicle and
portable equipment
for delivery of
outreach and mobile
elements. 
Recruitment of a small
team to coordinate
centrally from Moray
Council and deliver
outreach activity
across all ASGs.
Supported by a
network of upskilled
Identify suitable
premises within
each ASG in Moray,
refurbish and fit out
with facilities and
bespoke learning
equipment.
Purchase of a large
specialist vehicle
and equipment for
delivery of the
mobile solution.  
Recruitment of a
dedicated staffing
provision working
across each ASG
with support from a
network of upskilled
staff, community
volunteers and
Page 66

Page 67

Page 55 of 142 
Minimum Intermediate Maximum
staff, community
volunteers and public/
private partnerships. 
public/ private
partnerships. 
Benefits criteria 
Satisfying the potential scope for this investment will deliver the following high-level
strategic and operational benefits. These are as follows:
Class Of Objective Main Benefits Benefits Criteria Stakeholders Affected
Strategic (wider social
and Business related)
Business growth 
Attract / retain
young people. 
Reduce gender
pay gap. 
Rebalance
demographic
Increase number of
businesses in the area 
Increase higher paid
jobs. 
Increase alignment of
workforce skills with
business requirements 
Increase inward
investment to Moray. 
Increase the rate of
female employment. 
Increase the
percentage of females
in full-time posts. 
Increase working
population of the area
as percentage of total. 
Reduction in future
unemployment 
Reduce Rural
inequality. 
Town centre
regeneration and
increase in town
centre activity 
Young People
/
Moray residents
/ 
Local businesses
/
Public Sector 
Page 67

Page 68

Page 56 of 142 
Operational
(organisational and
management related)
Business growth 
Attract / retain
young people. 
Reduce gender
pay gap. 
Rebalance
demographic
Increase skills/training
opportunities. 
Increase the number
of young people
choosing to live/stay in
Moray. 
Increase percentage
of female school
leavers going in to 
STEM jobs 
Increase in attainment
in Curriculum for
Excellence at primary
and early secondary
level. 
Increase in the
number of STEM
subjects chosen at
national 5 and Higher. 
Increase in positive
leaver destinations of
young people. 
Increase in the
aspirations of young
people to access
STEM careers. 
Increased in activities
and events offered to
families. 
Increase networking
and connections
between businesses,
communities, and the
education sector. 
Improvement of local
services and facilities
accessed by the
public. 
Young People
/
Moray residents
/ 
Local businesses
/
Public Sector 
Page 68

Page 69

Page 57 of 142 
Class Of Objective Main Benefits Benefits Criteria Stakeholders Affected
Increase in community
participation in the
upskilling young
people. 
Improved Health and
Wellbeing of young
people and the wider
community 
Increase in young
people, families and
the wider community
accessing inspirational
learning environments. 
Increase in the
awareness of Morays
residents of the career
opportunities in
Morays local
economy. 
Increase in climate
awareness of young
people and the wider
community. 
Increased access to
technical infrastructure
to support learning
pathways across all
ages. 
Strategic risks 
The main business and service risks associated with the potential scope for this
project are shown below:
Page 69

Page 70

Page 58 of 142 
Risk categories  Mitigation
Business Risks 
Delays at planning application
stage 
Contractors failing to deliver
according to budget or timescales. 
Competing Demands for
Resources 
Inability to attract private sector
sponsorship. 
Early engagement with Council
Ongoing communications
Appointment of appropriate design team 
Appropriate procurement planning 
Appropriate contract penalties to be in place. 
Early market engagement
Appropriate procurement planning 
Early market engagement 
Ensure scope can be met within existing budgets. 
Service Risks 
Lack of employer, partner, and
community engagement 
Failure to develop scope that
meets objectives. 
Project fails to deliver core
benefits. 
Failure to recruit the staff with the
right mix of skills. 
Wild Things partner fails to raise
the required funds necessary to
support operational costs 
Consultation with Community Planning Partnership
and cross sharing of resources for engagement
Utilise partner connections. 
Early understanding of market needs 
Early understanding of needs
Communications and engagement
Project planning with key stakeholders
Project board with key stakeholders 
Stakeholders have strong reputation.
Project planning and risk
management/operationalisation
Ongoing communications and partnership-working 
Robust recruitment process 
Early engagement with external funders
Consider alternate suppliers should organisation fail
to meet service requirements 
Page 70

Page 71

Page 59 of 142 
Risk categories  Mitigation
External Environmental Risks 
Delays in Moray Growth Deal 
Difficulties drawing MGD funding
down. 
Miscommunications regarding
MGD. 
Conflict with Partner Initiatives 
Difficulty acquiring and securing
sites 
Communications with Governments
Management of expectations 
Communications with Moray Council and Scottish
Government finance teams 
Clear protocols to be developed at Full Deal stage. 
Coordinated MGD communications.
Project communications strategy 
Clear communications 
Scope alternative locations, seek legal guidance at
early project stages. 
Constraints
The project is subject to the following constraints:
• The project can be completed within the timescale required to allow the
benefits to accrue. 
• Resources are available to enable the project to be delivered on time and to
the right quality. 
Dependencies
The project is subject to the following dependencies that will be carefully monitored
and managed throughout the project life cycle:
• The project is dependent on ongoing political support and the relationship
between partners organisations.
• Dependency on Wild Things partner to meet operational costs of outdoor
centre through external funding sources. 
• Dependency on Leanchoil Trust to raise funds to enable delivery of Leanchoil
Health and Wellbeing Centre.
• Alignment with national / regional developments.
• Industry and stakeholder engagement
• The project has sufficient financial backing through implementation to ongoing
delivery, including the release of funding dependent on development of a full
business case.
Page 71

Page 72

Page 60 of 142 
3. The Economic Case 
Introduction
At the start of the development of the Outline Business Case a project board was
formed of key stakeholders to direct and guide the project. The key stakeholders
included representatives from:
• Moray Council
• Highlands and Islands Enterprise (HIE)
• Moray College UHI
• The University of the Highlands and Islands (UHI)
• Skills Development Scotland (SDS)
• Developing the Young Workforce (DYW)
• NHS Grampian
• Boeing
• Gordon and MacPhail
Membership was expanded following OBC approval to include:
• Aberdeen Science Centre (ASC)
• Education Scotland
• SSERC
At the inaugural meeting of the board, members undertook a benefits mapping
exercise to assist in developing the logic model for the project.
The logic model developed from this activity was as follows:  
Inputs Activities Outputs  Short Term
Outcomes
Long Term
Outcomes
Resources
needed to
deliver the
project.
Actions needed
to deliver the
project.
Measurable
direct results of
the activities.
Changes that
occur to the
beneficiaries
and the
medium-term
benefits on the
economy. 
The long-term
effect upon the
economy or
society
Capital
investment:
Staff resource
to develop
plans;
Operational
model;
Expertise
Permissions;
Develop
stakeholder
community;
Develop
partnership
arrangements.
Network of
inspirational
learning
environments
accessible to
families, ELCs,
Schools and
whole
Increased
confidence in
young people;
Increased
confidence in
adults;
Stronger
linkages
Increased
attainment at
secondary,
further and
higher
education in
STEM subjects;
Increase in
Page 72

Page 73

Page 61 of 142 
knowledge;
Stakeholder
Partnership
development;
Staff and
volunteer time; 
Site feasibility
and acquisition.
Construction or
renovation of
buildings. 
Fit out with
technology and
equipment;
Purchase of
vehicle and
STEM
Materials;
Recruitment
and training of
staff. 
Learning
programme
development
and delivery;
Upskilling of
existing staff
and
development of
learning
network;
Marketing.
communities;
Access to
learning
resources,
materials, and
experiences;
Training
opportunities
for staff and
volunteers;
Increase in
classroom-
based STEM
activity in early
years
curriculum;
STEM events
held in
collaboration
with partners;
Young people
engaging with
sectors on site
through visits;
STEM learning
opportunities
continue after
early years. 
between
education and
employment;
Increase in
teacher skills
and up skilling
of the wider
community
through CPD;
Better
pathways to
STEM
curriculum;
Improvement in
4 areas of
curriculum for
excellence
across all age
groups;
Increase in
choosing
STEM subjects
at secondary
school; More
women
choosing
STEM subjects;
Increased level
of investment
from STEM
businesses in
Moray;
Reduction in
rural inequality.
positive leaver
destinations of
young people,
Increase in
STEM subject
choices at
school and
Moray College
UHI; Increase
in high value
jobs accessed
by Morays
residents; Less
inequality of
opportunity in
education and
employment;
An increase in
the skill level in
Moray;
Increase in the
average wage
level; Less
future
unemployment;
Increase in
start-ups;
Reduction in
outward
migration of
young people;
Attract people
to live and work
in the area. 
Critical Success Factors
A programme board meeting was held on 11th May 2017 to determine the CSFs for
initial shortlist of projects. The attendees included relevant stakeholders from Moray
Economic Partnership, Highlands and Islands Enterprise, University of the Highlands
and Islands, Skills Development Scotland, and Moray Council. 
Following initial project scoring and prioritisation, these CSFs were amalgamated and
used alongside the investment objectives for each project to evaluate the long list of
possible options. The board decided that all CSF’s should have equal weighting and
be used for all projects in the deal to provide a consistent approach to evaluation.  
Page 73

Page 74

Page 62 of 142 
CSF1 Strategic Fit (Vision /
Government Policy)
How well the option provides holistic fit and
synergy with other key elements of
national, regional, and local strategies
CSF2 Potential VFM How well the option maximises the return
on the required spend (benefits
optimisation) in terms of economy,
efficiency, and effectiveness from both the
perspective of the organisation and wider
society and minimises associated risks.
CSF3 Potential Achievability How well the option is likely to be delivered
in view of the complexity of the option, and
the experience, capability and capacity of
the partners involved.
CSF4 Supply side capacity How well the option matches the ability of
the service providers to deliver the required
level of services and business functionality
and appeals to the supply-side.
CSF5 Potential Affordability How well the option meets the likely
availability of funding and matches other
funding constraints, including the capital
and revenue consequences associated
with the proposed investment. 
Long Listed Options 
The Treasury’s Green Book suggested options framework was used to generate a
reasonable number of options for the long list by systematically working through the
available choices for what, how, who, when and funding. 
These options were generated at OBC stage by holding a series of workshops with a
wide group of stakeholders, at which evaluation was undertaken to assess how well
each option met the investment objectives and CSFs at each stage.
A short list of options was then developed, and an economic appraisal performed by
Michael O’Donnell, Senior Officer for Economic Strategy and Growth at Moray
Council. Based on this analysis, a model was selected as the optimum solution in
relation to estimated benefit and service delivery and included in the Outline Business
Case (OBC) that was approved in November 2021.  
In developing the Full Business Case, options as set out in the OBC have been
revisited to reflect the current economic climate and supply side capacity. Activities
were undertaken to assess the feasibility of delivering the preferred option as identified
in the OBC, including stakeholder engagement, site identification and exploring
potential delivery models. 
Page 74

Page 75

Page 63 of 142 
Key risks affecting delivery of the project were identified and summarised in an issues
report that was presented to the Moray Growth Deal Programme Board in July 2022.
Rising construction and operational costs, availability of suitable host locations and
limited ongoing revenue funding for staff were identified as risks affecting delivery a
provision in each Associated School Group (ASG). 
A period of consultation and project re-scoping was undertaken, and a revised long
list of options presented for appraisal by the Early Years STEM Project Board in
December 2022. 
Short- Listed Options 
From the options appraisal workshops undertaken and detailed in Appendix 1, a range
of shortlisted options were developed to be considered for economic appraisal. 
The five updated options are as follows: 
Option 1: Business As Usual – No Growth Deal Funding
Service
Solution 
Continue promoting and delivering STEM from within Council
resources and in line with current STEM provision. 
Activity would depend on budget and staff availability. 
Estimated Costs £0
Option 2: Minimum – Hub provision in each Early Learning and Primary
Setting, Mobile Offering and Partnership Activity
Service
Solution
Capital funding split across all Early Learning and Primary School
settings in Moray to develop STEM learning environments and
purchase STEM equipment, as per the needs of the individual
setting. This may include purchase of IT and digital equipment,
purchase of a STEM resource bank, development of flexible
learning spaces, provision of outdoor learning equipment, etc. 
A large specialist vehicle offering mobile delivery of bespoke
learning programmes and exhibition materials, bringing the
benefits of a Science Centre to Moray. 
A portion of capital funding allocated to invest in events,
equipment, and facilities at partner locations.
Service
Requirements
STEM Coordinator post responsible for curriculum development,
resource management and workforce development. Existing staff
in each setting and partners at partner sites will deliver the service. 
Implementation Phased implementation 
Funding
Requirements
Capital funding provided by the Scottish Government and Moray
Council. Ongoing revenue costs met by the Moray Council.
Page 75

Page 76

Page 64 of 142 
Estimated
Costs
Capital:    £3,800,000
Revenue: £1,000,000
Option 3: Intermediate – One Central Provision, Mobile and Outreach
Offering and Partnership Activity
Service
Solution
Capital funding used to deliver one central provision serving all
ASGs in Moray. A Moray STEM Centre with dedicated exhibition
space and community learning hub. 
A mobile solution to transport facilities and equipment, enabling
delivery of a “pop-up STEM Centre” in any suitable venue in
Moray. A robust outreach provision that includes digital delivery
and a central repository of STEM resources. 
A portion of capital funding allocated to invest in events,
equipment, and facilities at partner locations.
Service
Requirements
A small team of staff will deliver the service centrally in
collaboration with a multi-agency partnership. 
Implementation Phased implementation
Funding
Requirements
Initially, capital funding provided by the Scottish Government and
Moray Council with ongoing revenue costs met by the Moray
Council.  Additional funding streams sourced as the project
becomes established and opportunities arise.
Estimated
Costs
Capital:    £4,400,000
Revenue: £1,460,000
Option 4: Intermediate (Preferred) – A provision in targeted locations across
Moray, Mobile and Outreach Offering and Partnership Activity.
Service
Solution
Capital funding used to deliver a network of STEM facilities in
targeted locations across Moray. A Moray STEM Centre with
dedicated exhibition space and community learning hub, and a
network of satellite sites extending the reach of engagements. 
An Environmental Education Centre specialising in outdoor
learning and learning for sustainability. 
A mobile solution to transport facilities and equipment, enabling
delivery of a “pop-up STEM Centre” in any suitable venue in
Moray. A robust outreach provision that includes digital delivery
and a central repository of STEM resources. 
A portion of capital funding allocated to invest in events,
equipment, and facilities at partner locations.
Service
Requirements
A small team of staff will deliver the service centrally in
collaboration with a multi-agency partnership. 
Page 76

Page 77

Page 65 of 142 
Implementation Phased implementation
Funding
Requirements
Initially, capital funding provided by the Scottish Government and
Moray Council with ongoing revenue costs met by the Moray
Council.  Additional funding streams sourced as the project
becomes established and opportunities arise.  
Estimated
Costs
Capital:    £4,800,000
Revenue: £1,600,000
Option 5: Maximum – A provision in each Associated School Group (ASG) in
Moray, Mobile Offering and Partnership Activity. 
Service
Solution
Preferred option at OBC stage. Fixed sites in each ASG in
Moray. A bespoke offering dependant on need and geography
and utilising existing Moray Council or partner space. 
A large specialist vehicle offering mobile delivery of bespoke
learning programmes and exhibition materials, bringing the
benefits of a Science Centre to Moray. 
A portion of capital funding allocated to invest in events,
equipment, and facilities at partner locations.
Service
Requirements
A team of staff will deliver the service centrally in collaboration
with a multi-agency partnership.
Implementation Phased implementation
Funding
Requirements
Initially, capital funding provided by the Scottish Government and
Moray Council with ongoing revenue costs met by the Moray
Council.  Additional funding streams sourced as the project
becomes established and opportunities arise.  
Estimated
Costs
Capital:    £5,100,000
Revenue: £2,110,000 
The likelihood of each of the short-listed options in delivering the project objectives
has been evaluated systematically with scores based on the alignment of each option
with the investment objectives and Critical Success Factors (CSFs). The scores range
from 0 to 5, with 5 indicating strong alignment and 0 indicating no alignment. A
narrative summary of this assessment for each option is provided below the table. 
The investment objectives are as follows: 
Investment Objective 1 – To increase the availability of STEM opportunities
for younger people, through the creation of experiential STEM learning hubs
delivering upwards of 9000 engagements per annum by 2032.  
Investment Objective 2 - To increase participation and attainment in STEM
subjects at secondary level by 8%, thereby encouraging uptake at further and
higher education and ultimately increasing the STEM skills level in Moray by
2042. 
Page 77

Page 78

Page 66 of 142 
Investment Objective 3 - To ensure there is equality of opportunity in STEM
education across Moray, ensuring all students aged 3-8 are engaged with the
curriculum at least once per annum no matter their location, and increasing
female participation in STEM subjects at secondary level by 10% by 2042. 
Investment Objective 4 – To increase the skills level of early year’s
practitioners and primary teachers in the delivery of STEM disciplines, with an
increase of 32 STEM champions in settings by 2032. 
Investment Objective 5 – To strengthen science capital within communities
through the provision of 10 public engagement events per annum, thereby
encouraging parental engagement, inter-generational learning, and raising the
awareness of STEM related careers by 2032. 
Investment Objective 6 – To develop new forms of delivery through multi-
agency collaboration and inter-disciplinary working, engaging 400 students
aged 3-12 in partner led programmes and events, and increasing the number
of industry and community STEM Ambassadors in Moray by 50% by 2032.
Options  Option 1  Option 2  Option 3  Option 4  Option 5 
Objectives 
Investment
Objective 1
1 2 3 5 5
Investment
Objective 2
1 3 4 5 4
Investment
Objective 3
1 4 2 4 5
Investment
Objective 4
1 4 4 5 4
Investment
Objective 5
1 2 4 5 5
Investment
Objective 6
1 2 4 5 5
CSFs  
Strategic Fit /
Vision 
1 2 3 5 5
Potential VFM  3 2 4 5 3
Potential
Achievability 
5 3 5 5 1
Supply Side
Capacity 
5 4 5 5 1
Potential
Affordability 
5 5 5 5 1
Total Score 25 33 43 54 39 
Discounted Possible Possible Preferred Discounted
Page 78

Page 79

Page 67 of 142 
Option 1: Business As Usual – No Growth Deal Funding
This option requires no intervention or investment in education and given that there is
no anticipated change in capital or revenue funding required, scores well across some
CSFs in terms of potential achievability, ensuring there is supply side capacity to
deliver, and affordability. However, the current STEM provision lacks resource to
deliver meaningful STEM engagements, and the target audience (age 3-8) is largely
underserved. STEM activity is achieved through ad-hoc piecemeal delivery and
partnership activity is uncoordinated with little evidence of impact. This Option
therefore scores poorly across the investment objectives and strategic fit, and
relatively poorly on Value for Money (VfM) given the likelihood of wasted resource
through duplication.
Option 2: Minimum – Hub provision in each Early Learning and Primary
Setting, Mobile Offering, and Partnership Activity
With this option, capital funding would be split across Associated School Groups
(ASG)s and given directly to Early Learning and Childcare (ELC) and primary settings
to invest in resources, facilities, and equipment, as per the needs of the individual
setting. Pupils would have the opportunity to engage with the STEM curriculum daily,
having the resource to do so, therefore the option is likely to have moderate impact on
attainment in the short term. However, as this will be a one-off investment, the option
has a high risk of obsoletion given the rate at which STEM technology develops. While
a STEM Coordinator resource would enhance workforce development, engagements
would rely on existing staffing structures and enthusiasm of practitioners. The option
is also likely to have lower impact on parental engagement, intergenerational learning,
and multi-agency collaboration with uncoordinated and piece meal delivery that lacks
specialism. Inspirational experiences could be delivered using a large specialist mobile
solution, however operation, maintenance, and sustainability of this type of vehicle
does not represent a value for money solution. While option 2 delivers equitable
access with funding transferred directly to the beneficiaries, it is likely to have lower
impact over the longer term. 
Option 3: Intermediate – One Central Provision, Mobile and Outreach Offering,
and Partnership Activity
With Option 3, funding would be used to develop one central facility, complemented
by a robust outreach provision and mobile offering. A physical site located out with the
learning estate offers greater accessibility to employers, parents and the wider
community and has significant impact in terms of multi-agency collaboration and inter-
generational learning. Partners can access the facilities to deliver diverse learning
opportunities to a wider audience and a state-of-the art central facility would create
interest among audiences and likely attract investment from external funders.  The
centre would act as a hub to coordinate and catalyse activity, developing educational
programmes, coordinating, and promoting public events, and working closely with the
STEM ambassador network to increase their impact. The offer would be further
enhanced by a mobile “pop-up” offering and a central repository of STEM resources
Page 79

Page 80

Page 68 of 142 
available for setting to borrow for classroom-based STEM activity. This option offers a
well-considered and robust learning programme however, impact is limited by the
extent of engagements, as one facility has less capacity to serve audiences on a
frequent basis. Additionally, while being located centrally in Moray, the option does not
address rural poverty to the same extent as other options considered. 
Option 4: Intermediate (Preferred) – A provision in targeted locations across
Moray, Mobile and Outreach Offering, and Partnership Activity.
Option 4 delivers all the benefits of option 3 while extending the reach and quality of
STEM engagements. The inclusion of satellite sites, in addition to the central
coordinating facility and mobile “pop-up” solution as described in option 3, addresses
rurality as a barrier to participation, though to a lesser extent than option 5.  The
incorporation of a unique outdoor environmental education centre delivered in
collaboration with a local environmental charity, offers young people experiential
hands-on learning in the natural environment, and learning for sustainability
opportunities, thereby contributing to Moray Councils Net Zero ambitions. This option  
delivers against all investment objectives whilst satisfying the critical success factors
in terms of affordability, achievability, and supply side capacity. Revenue commitments
are higher than options 2 and 3, with a dedicated staffing resource required to deliver
activity across all sites, however costs can be met within allocated budgets and
therefore represents the optimum balance between affordability and benefits
realisation. 
Option 5: Maximum – A provision in each Associated School Group (ASG) in
Moray, Mobile Offering and Partnership Activity.
Option 5 was the preferred option at OBC stage as it delivers against all investment
objectives and offers greatest ASG coverage. A provision in each ASG allows learners
to engage with the STEM curriculum on a frequent basis, and provides high impact
regarding STEM attainment, family engagement and multi-agency collaboration.
Option 5 was taken forward for further appraisal at OBC stage, with activities
undertaken to determine feasibility of the solution. Rising construction and operational
costs, availability of suitable host locations in each ASG, and limited ongoing revenue
funding for staff were identified as key issues, likely to impact affordability and
achievability of the solution. Engagement with education staff indicated limited
utilisation of facilities in rural areas, with preference for a flexible, mobile solution in
those locations. It was therefore determined that option 5 did not represent a value for
money solution, nor was it achievable within allocated budget. Option 5 was therefore
discounted and not taken included as part of the economic appraisal. 
Economic Appraisal
This section provides a detailed overview of the main costs, benefits and value for
money associated with each of the selected options, and the approach taken to
determining the preferred option. The full appraisal conducted by Ekosgen is included
in Appendix 2 and summarised in this section. 
Page 80

Page 81

Page 69 of 142 
Quantitative Economic Appraisal 
A quantitative economic appraisal was undertaken of the following short-listed options
for the Moray Early Years STEM project:
• Option 1 (Business as Usual): The reference baseline case where no
Moray Growth Deal funding would be allocated, continuing to promote and
deliver STEM in line with current STEM provision.
• Option 2 (Minimum): Hub provision in each Early Learning and Primary
Setting, Mobile Offering, and Partnership Activity.
• Option 3 (Intermediate): One Central Provision, Mobile and Outreach
Offering, and Partnership Activity.
• Option 4 (Intermediate: Preferred Option): A provision in targeted
locations across Moray, Mobile and Outreach Offering, and Partnership
Activity.
This has been conducted firstly with a Cost Benefit Analysis (CBA) appraisal of each
option, followed by an assessment of the employment, and Gross Value Added (GVA)
impacts of project expenditures in Moray.
Description, Sources, and Assumptions
This Cost Benefit Analysis was undertaken in line with HM Treasury Green Book
(2022) guidance.75 The benefits that have been appraised are those that were included
in the Outline Business Case (OBC), namely: 
• Uplift in Salary
• Income Multiplier
• Unemployment Prevention
These benefits have been reviewed, changed and/or updated. The new financial costs
for each option were included.
Option 1 has been presented as the “Business as Usual” case to demonstrate the
counterfactual against which all proposals for change can be compared. 
Year zero in this appraisal is the 2020/21 financial year as this was the year funding
allocations were confirmed in the Moray Growth Deal (MGD) Heads of Terms. The
MGD consists of a programme of projects and therefore using 2020/21 as the base
year allows comparison between the projects as they have different start dates within
the 15-year programme. 
The project was initially appraised over 21 years, with the last year being 2040/41,
with benefits realisation not beginning until into the 2030s. The benefit streams were
over seven years and built up quite gradually over that period, leading to, for example,
BCRs at the Moray level of around or below 1.0.   Advice from Scottish Government
suggested increasing the length of the appraisal period to demonstrate the longer-
75 https://assets.publishing.service.gov.uk/media/623d99f5e90e075f14254676/Green_Book_2022.pdf 
Page 81

Page 82

Page 70 of 142 
term benefits of the project. Therefore, the appraisal period has been extended up to
2045/46. In this report the benefit streams are shown for the two following time periods:
• 10 years-from 2034/35 to 2043/44; and
• 12 years-from 2034/35 to 2045/46. This is for illustrative purposes, with less
detail shown than for the appraisal covering the 10-year benefits stream.
Financial costs and benefits have been expressed in real terms (i.e. today’s prices)
with the effects of inflation removed. The financial costs supplied to ekosgen by Moray
Council were expressed in nominal terms. The individual year’s inflation rates that
were used to deflate nominal cost prices were as follows:
• 2024/2025: 1.9%.
• 2025/2026: 1.1%.
• 2026/2027: 1.0%.
• 2027/2028: 1.6%; and
• 2028/2029 and subsequent years: 2.0%
These figures are based on information within the Office for Budget Responsibility’s
Economic and Fiscal Outlook Reports as per guidance in The Green Book Central
Government Guidance on Appraisal and Evaluation.
The values of the two benefits-Salary uplift and Unemployment related benefits-are
expressed in real terms. In each year they are assumed to increase at the level of
general inflation such that there is no real terms increase or decrease in the values
during the appraisal period.
Cost Benefit Analyses (CBAs) were undertaken at three geographical levels:
• At the Moray local authority level
• At the Scotland level
• At the United Kingdom level 
The net present value (NPV) of costs and benefits were calculated using a discount
rate of 3.5%. 
The coverage and basis of the numbers underpinning the OBC’s CBA results were
reviewed including, importantly, the changes to the content each of Options 1, 2, 3, 4
presented compared to that in the OBC. That included reviewing the FBC’s analysis
of each option’s:
• Content
• Strengths and weaknesses, including the expected number of
engagements.
• Scored performance against Investment Objectives and Critical Success
Factors.
Page 82

Page 83

Page 71 of 142 
The timings of the various project elements were also reviewed as these determine
when the benefits will begin to be realised. 
The analysis of each option is summarised below. It was used to help scale the relative
level of impacts between Options 1, 2, 3 and 4. 
Estimating Costs 
Project Costs 
The project’s costs for each option are provided in the table below. These costs are
the same for each of the three geographies of Moray, Scotland, and UK. They cover
the appraisal period between 2020/21 and 2045/46. 
In each option, most of the costs are capital costs. Option 4 has the highest total
project cost at around £6.4 million. Option 3 costs are around £5.8 million, with Option
2 presenting the lowest costs at around £4.8 million (75% of the cost of Option 4). 
Project Costs (£,000)
Option Capital Costs Revenue Costs Total Costs
1 - - -
2 3,800 998 4,798
3 4,400 1,459 5,859
4  4,800 1,599 6,399
Source: Consultant Calculations
Detailed Costs for all Options are included in Figures 13 and 14. 
Assumptions 
• The mechanism for delivery of Option 2 is to award Grants to individual settings
to develop STEM Hubs within each location. This may include renovation costs,
furniture or equipment costs, dependent on the needs of the setting. The value
of grant awarded is based on £300 per pupil enrolled. 
• Option 3 includes construction and exhibition costs for a state-of-the-the-art
STEM facility with an assumed floor space of 600m2. Land purchasing costs
have not been included as renovation of existing Moray Council sites is
assumed. Construction costs are estimated at £3000 per sqm and exhibition
costs at £2000 per sqm for 400 m2 of exhibition space. 
• Option 5 includes renovation costs for 8 STEM Hub locations at an assumed
rate of £3000 per sqm with an assumed floor space of 100sqm per site.
Exhibition costs are based on £2000 per sqm for 50 sqm of exhibition space at
each site. 
• Utilities costs at £35/sqm have been assumed for all sites. 
Page 83

Page 84

Page 72 of 142 
Figure 13 Cost Estimates for options 2 & 3, Moray Council 
Option 2 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total
Capital Spend (SG and Moray Council)
STEM Hubs Costs (School Grants) £45,000 £709,500 £632,600 £618,300 £594,600 £2,600,000
Mobile Costs £520,000 £10,000 £15,000 £10,000 £15,000 £10,000 £10,000 £10,000 £600,000
Community STEM Grants £100,000 £100,000 £100,000 £100,000 £100,000 £100,000 £600,000
£0 £45,000 £520,000 £10,000 £824,500 £742,600 £733,300 £704,600 £110,000 £110,000 £0 £0 £3,800,000
Revenue Spend (Moray Council)
Staff
Project Manager £53,595 £71,338 £12,922 £137,855
STEM Engagement Manager 1 FTE £45,109 £71,238 £73,375 £75,576 £77,844 £80,179 £82,584 £85,062 £87,614 £90,242 £768,823
Mobile Running Costs £8,000 £8,240 £8,487 £8,742 £9,004 £9,274 £9,552 £9,839 £10,134 £10,438 £91,711
Total Revenue Costs £53,595 £71,338 £66,031 £79,478 £81,862 £84,318 £86,848 £89,453 £92,137 £94,901 £97,748 £100,680 £998,389
Option 3 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total
Capital Spend (SG and Moray Council)
Professional Fees £200,000 £200,000 £400,000
Construction Costs £800,000 £1,000,000 £1,800,000
Exhibition / Equipment Costs £400,000 £400,000 £100,000 £900,000
Mobile Outreach Costs £80,000 £160,000 £240,000
Ongoing Equipment Costs £60,000 £80,000 £80,000 £80,000 £80,000 £80,000 £460,000
STEM Grants 100000 100000 100000 100000 100000 100000 £600,000
£0 £200,000 £1,080,000 £1,560,000 £560,000 £280,000 £180,000 £180,000 £180,000 £180,000 £0 £0 £4,400,000
Revenue Spend (Moray Council)
Staff
Project Manager £53,595 £71,338 £12,922 £137,855
STEM Engagement Manager 0.7 FTE £30,528 £47,165 £48,580 £50,037 £51,538 £53,085 £54,677 £56,317 £58,007 £59,747 £509,682
STEM Coordinator 0.7 FTE £28,047 £28,888 £29,755 £30,647 £31,567 £32,514 £33,489 £34,494 £35,529 £284,929
Branding & Marketing £5,000 £5,000
Rent & Rates £10,000 £10,300 £10,609 £10,927 £11,255 £11,593 £11,941 £12,299 £12,668 £101,591
Insurances £2,000 £2,000 £2,000 £2,000 £2,000 £2,000 £2,000 £2,000 £2,000 £18,000
Utilities £15,000 £15,450 £15,914 £16,391 £16,883 £17,389 £17,911 £18,448 £19,002 £152,387
Cleaning costs £10,000 £10,300 £10,609 £10,927 £11,255 £11,593 £11,941 £12,299 £12,668 £101,591
Consumables £5,000 £10,000 £10,000 £10,000 £10,000 £10,000 £10,000 £10,000 £10,000 £10,000 £95,000
Mobile Solution Running Costs £5,000 £5,600 £5,712 £5,826 £5,943 £6,062 £6,183 £6,307 £6,433 £53,065
Total Revenue Costs £53,595 £71,338 £53,450 £127,212 £131,118 £134,635 £138,257 £141,987 £145,827 £149,781 £153,853 £158,045 £1,459,099
Page 84

Page 85

Page 73 of 142 
Figure 14 Cost Estimates for options 4 & 5, Moray Counci
Option 4 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total
Capital Spend (SG and Moray Council)
Professional Fees £46,493 £127,279 £70,581 £80,000 £70,000 £20,000 £414,353
Construction Costs £596,750 £448,897 £830,000 £350,000 £350,000 £2,575,647
Exhibition/ Equipment Costs £20,000 £238,001 £301,999 £200,000 £200,000 £960,000
Mobile Outreach Costs £70,000 £180,000 £250,000
Ongoing Equipment Costs £100,000 £100,000 £100,000 £300,000
STEM Grants 100000 100000 100000 £300,000
£0 £66,493 £1,032,030 £1,001,477 £910,000 £620,000 £550,000 £200,000 £200,000 £220,000 £0 £0 £4,800,000
Revenue Spend (Moray Council)
Staff
Project Manager £53,595 £71,338 £12,922 £137,855
STEM Engagement Manager 0.7 FTE £30,528 £47,165 £48,580 £50,037 £51,538 £53,085 £54,677 £56,317 £58,007 £59,747 £509,682
STEM Coordinator 0.7 FTE £28,047 £28,888 £29,755 £30,648 £31,567 £32,514 £33,490 £34,494 £35,529 £284,932
STEM Coordinator 0.7 FTE £28,047 £28,888 £29,755 £30,648 £31,567 £32,514 £33,490 £34,494 £35,529 £284,932
Branding & Marketing £7,000 £7,000
Rental & Utilties £9,270 £9,548 £14,752 £20,260 £20,865 £21,492 £22,137 £22,801 £23,485 £164,610
Insurances £2,000 £2,060 £2,122 £2,185 £2,251 £2,319 £2,388 £2,460 £2,534 £2,610 £22,928
Consumables £5,000 £10,000 £10,000 £15,000 £15,000 £15,000 £15,000 £15,000 £15,000 £15,000 £130,000
Mobile Solution Running Costs £5,000 £5,150 £5,305 £5,464 £5,628 £5,796 £5,970 £6,149 £6,334 £6,524 £57,319
Total Revenue Costs £53,595 £71,338 £62,450 £129,739 £133,331 £146,949 £155,972 £160,199 £164,556 £169,043 £173,664 £178,424 £1,599,260
Option 5 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total
Capital Spend (SG and Moray Council)
Professional Fees 80000 75000 75000 75000 75000 20000 £400,000
Construction Costs £600,000 £600,000 £600,000 £600,000 £2,400,000
Exhibition/ Equipment Costs £200,000 £200,000 £200,000 £200,000 £800,000
Mobile Costs £520,000 £10,000 £15,000 £10,000 £15,000 £10,000 £10,000 £10,000 £600,000
Ongoing Equipment Costs £30,000 £30,000 £60,000 £60,000 £60,000 £60,000 £300,000
STEM Grants 100000 100000 100000 100000 100000 100000 £600,000
£0 £0 £600,000 £10,000 £1,020,000 £1,015,000 £1,050,000 £1,045,000 £170,000 £190,000 £0 £0 £5,100,000
Revenue Spend (Moray Council)
Staff
Project Manager £53,595 £71,338 £12,922 £137,855
STEM Engagement Manager 0.7 FTE £30,528 £47,165 £48,580 £50,037 £51,538 £53,085 £54,677 £56,317 £58,007 £59,747 £509,682
STEM Coordinator 0.7 FTE £28,888 £29,755 £30,647 £31,567 £32,514 £33,489 £34,494 £35,529 £256,882
STEM Coordinator 0.7 FTE £29,755 £30,648 £31,567 £32,514 £33,490 £34,494 £35,529 £227,997
STEM Coordinator 0.7 FTE £30,647 £31,566 £32,513 £33,489 £34,493 £35,528 £198,237
STEM Coordinator 0.7 FTE £31,567 £32,514 £33,489 £34,494 £35,529 £167,593
Branding & Marketing £5,000 £5,000
Rental & Utilities £7,000 £14,000 £21,000 £28,000 £28,840 £29,705 £30,596 £31,514 £190,656
Insurances £2,000 £2,000 £2,000 £2,000 £2,000 £2,000 £2,000 £2,000 £16,000
Consumables £5,000 £5,000 £15,000 £25,000 £35,000 £45,000 £45,000 £45,000 £45,000 £45,000 £310,000
Mobile Solution Running Costs £8,000 £8,240 £8,487 £8,742 £9,004 £9,274 £9,552 £9,839 £10,134 £10,438 £91,711
Total Revenue Costs £53,595 £71,338 £61,450 £60,405 £109,955 £159,289 £210,484 £263,626 £270,125 £276,819 £283,713 £290,814 £2,111,613
Page 85

Page 86

Page 74 of 142 
Net Present Value (NPV) of Project Costs 
The Net Present Value (NPV) of total project costs for each option are shown below:
As advised by Scottish Government, the capital costs in Options 3 and 4 include an
optimism bias of 15%. Moray Council advised that this level of optimism bias in based
on QS’s estimates for minimal intervention construction projects. 
Total Project Costs (£,000, NPV)
Option Total Project Costs 
1 -
2 3,522
3 4,740
4 5,125
Source: Consultant Calculations
Carbon Emissions Costs 
The total impact (expressed as a NPV) of the carbon emissions (central estimates) for
each of the options is summarised below. These costs are the same for each of the
three geographies of Moray, Scotland, and UK. 
The carbon emission costs represent only a very small percentage of the overall
project costs. 
Carbon Emission Costs: Central Estimates (£,000, NPV)
Option 1 2 3 4
NPV - 148 128 108
Source: Consultant Calculations
Total Costs 
Taking the total costs (i.e. the project costs and the carbon emissions costs together),
it can be seen in Table 3.4 that Option 4 is the option with the highest costs, at around
£5.2 million in Net Present Value. In contrast, Option 2 (which reflects the minimum
level of provision sought) presents the lowest costs at around £3.7 million in Net
Present Value (roughly 70% of the cost of Option 4). 
Total Costs (£,000, NPV) 
Option 1 2 3 4
NPV - 3,671 4,868 5,233
Source: Consultant Calculations
Estimating Benefits
Scope and Approach to Benefits Appraisal
The benefits analysis has been based on the three types of impacts that were included
in the Outline Business Case. The OBC work was reviewed and updated to account
for changes in the content of options and updated or revised figures underpinning
Page 86

Page 87

Page 75 of 142 
some of the estimation of benefits, and the timing of the various project elements. The
three benefits are described and appraised below.
These benefits can only be realised from 10-15 years from the date the project begins
as the learner will have to go through further or higher education before entering the
workforce. Thus, benefits begin to be realised relatively late in the appraisal period
(i.e. from 2034/35 onwards). To assess the long term benefits, the appraisal period
was extended with results provided for a 10-year benefit stream (to year 2043), and a
12 year (to 2045/46) benefit stream also included for illustrative purposes. 
Some of the benefits do not start to accrue until the second half of the 2030s.For
example, in Option 4 the benefits are forecast to start in the following years:
• 2034-2035: Outreach.
• 2035-2036: Elgin STEM Centre, Mobile Solution.
• 2036-2037: Environmental Sciences STEM Centre.
• 2037-2038: Forres STEM Centre.
• 2038-2039: Buckie STEM Centre.
The results are quite sensitive to the number of years in which benefits are realised
and their timing within the appraisal period. As the benefits increase cumulatively over
time then the number of years in which they occur significantly affects the results. A
change of one or two years of benefits can have a significant impact. This helps to
explain the size of some of the benefits that are included in the cost benefit analysis
in this report.
The discounting process in cost benefit analysis means that benefits that accrue in the
later part of the appraisal period are quite heavily discounted with a discount rate of
around 50% in 2040-41.
However, all the project elements will at least begin to accrue benefits before the end
of the appraisal period. Given the long-term nature of the project, they will continue to
generate increasing levels of benefits in the years after the end of the appraisal period. 
Distribution Analysis
Given that the proposed development has been designed to increase interest and
attainment in STEM for local pupils and early years children in Moray, the geographical
distribution of impacts mostly lies within the Moray local authority area. Their actual
distribution will reflect a range of factors, e.g. location of the lead contractors and their
arrangements for purchases of required goods and services. 
At present, the following assumptions are made for the forecasted impacts across
each benefit: 
• Uplifts in salary have been estimated to be delivered as a result of young
people, inspired by the proposed development, seeking high-quality jobs in
STEM. It is estimated that 80% of those receiving an uplift in salary would
Page 87

Page 88

Page 76 of 142 
remain in Moray, 90% would remain in Scotland, and 100% would remain
in the UK.
• Income multipliers were applied to salary uplift benefits at OBC stage to
calculate induced impacts. The multipliers that were applied include a 1.11
multiplier for Moray, a 1.14 multiplier for Scotland and a 1.25 multiplier for
UK salary uplifts76. This reflects that, for those that are receiving an uplift in
salary, their expenditure on goods and services will be dispersed across the
various spatial levels.
• It is assumed that, as a result of children and young people receiving good
quality jobs after being inspired by the proposed development, there will also
be both savings to the public purse (through not having to pay
unemployment benefits) and also gains to the public purse (through
income tax and National Insurance payments). This appraisal has identified
universal credit, Council tax credit, income tax, and both employee and
employer National Insurance contributions as the main benefits accrued,
with varying impacts being felt at Moray (Council Tax credit savings),
Scotland (income tax gains) and UK (National Insurance gains and universal
credit savings) levels.
Benefit 1: Uplift in salary
Raising attainment in STEM subjects will contribute towards addressing two issues.
First, Moray has a below national average median wage level and a larger than
national average gender pay gap. In 2023 the median wage of residents in Moray
(£26,750) was around only 90% of the Scottish average (£29,842)77.
Second, in 202178 the gender pay gap figure for Moray was 16%. This compares to a
Scottish average of 13%. Moray had the 10th highest pay gap figure of Scotland’s 32
local authorities. This is likely to reflect a combination of lower skill levels and
underemployment for women.
National education statistics show that fewer students in Moray stay in secondary
school until 6th year, on average this is 8.5 percentage points below the Scottish
average. This leads to lower academic attainment than the Scottish average, which is
multiplied due to lower pass rates in STEM subjects than the national average.
In the OBC, a figure for increases in STEM qualifications was applied to a salary uplift
resulting from better and more appropriate qualifications. An uplift of 20% (£6,323)
was applied. 
76 Induced multipliers were estimated based on income multipliers contained in the 2019 Scottish
Input-Output Tables. These were estimated as 1.11 for spend in Moray and 1.14 for spend in
Scotland as a whole. The UK multiplier was estimated as 1.25 (we understand that UK Government
do not produce induced multipliers for use at the UK level).
77 Annual Survey of Hours and Earnings (ASHE) 2023 ONS
78 This is the latest year for which we have been able to source data
Page 88

Page 89

Page 77 of 142 
This figure was refined for the Final Business Case. A revised figure was estimated by
comparing the average UK wage levels in various skilled process and manufacturing
roles with those currently paid in Moray. The result was an estimate of a £6,884 salary
uplift per additional STEM educated student per year. The gross wage figure is a proxy
to measure the increased economic value/productivity of the worker. The increased
value of the output includes the associated income tax and National Insurance.
Therefore, the full amount (i.e. £6,884) per post is included in the appraisal.
Not all of those receiving a salary uplift as a result of additional or higher STEM
qualifications will have will have taken up a job in Moray. However, we would expect
this to largely be the case. It is assumed that:
• 80% of the total number of salary uplifts would be in Moray.
• 90% would be in Scotland.
• 100% would be in the UK. 
The tables below show the cumulative benefits over 10 years on an annual basis for
each of the three Options and each of the three geographical areas.
Option 2 Salary Uplift: 10 Year Benefit Stream
Year 34-35 35-36 36-37 37-38 38-39 39-40 40-41 41-42 42-43 43-44 Total
Moray
Non-
Discounted
Totals (£000) 66 199 399 665 931 1,197 1,463 1,729 1,993 2,258 10,901
Discounted
Totals (£000) 41 119 230 371 501 623 735 840 935 1,023 5,418
Scotland
Non-
Discounted
Totals (£000) 75 224 449 748 1,047 1,347 1,646 1,945 2,242 2,540  12,264
Discounted
Totals (£000) 46 134 259 417 564 700 827 945 1,052 1,151  6,095
UK
Non-
Discounted
Totals (£000) 83 249 499 831 1,164 1,496 1,829 2,161 2,492 2,822  13,626
Discounted
Totals (£000) 51 149 288 463 627 778 919 1,049 1,169 1,279  6,773
Source: Consultant Calculations
Option 3 Salary Uplift: 10 Year Benefit Stream
Year 34-35 35-36 36-37 37-38 38-39 39-40 40-41 41-42 42-43 43-44 Total
Moray
Non-
Discounted
Totals (£000) 74 223 446 743 1,115 1,487 1,859 2,230 2,605 2,979 13,762
Discounted
Totals (£000) 46 133 257 414 600 773 934 1,083 1,222 1,350 6,814
Scotland
Page 89

Page 90

Page 78 of 142 
Non-
Discounted
Totals (£000) 84 251 502 836 1,255 1,673 2,091 2,509 2,931 3,352  15,483
Discounted
Totals (£000) 52 150 289 466 675 870 1,050 1,218 1,375 1,519  7,666
UK
Non-
Discounted
Totals (£000) 93 279 558 929 1,394 1,859 2,323 2,788 3,256 3,724  17,203
Discounted
Totals (£000) 57 166 322 517 750 967 1,168 1,354 1,528 1,688  8,518
Source: Consultant Calculations
Option 4 Salary Uplift: 10 Year Benefit Stream
Year 34-35 35-36 36-37 37-38 38-39 39-40 40-41 41-42 42-43 43-44 Total
Moray
Non-
Discounted
Totals (£000) 110 233 500 910 1,462 2,015 2,567 3,120 3,672 4,223 18,812
Discounted
Totals (£000) 68 139 288 507 787 1,048 1,290 1,515 1,723 1,914 9,280
Scotland
Non-
Discounted
Totals (£000) 124 263 563 1,023 1,645 2,266 2,888 3,510 4,131 4,751  21,163
Discounted
Totals (£000)  76  157  324  570  886  1,179  1,451  1,704  1,938  2,154  10,440
UK
Non-
Discounted
Totals (£000) 137 292 625 1,137 1,828 2,518 3,208 3,900 4,590 5,279  23,515
Discounted
Totals (£000) 85 174 360 634 984 1,310 1,613 1,894 2,154 2,393  11,600
Source: Consultant Calculations
The tables below illustrate the number of individual workers in each year that are in a
job with the salary uplift, and the total number of salary uplifts, across the 10-year
period.
Option 2: Cumulative Numbers of Workers Per Annum with Salary Uplift
Year/
Residence
34-35 35-36 36-37 37-38 38-39 39-40 40-41 41-42 42-43 43-44 Total
Number of
Annual
Salary
Uplifts 
Moray  10 29 58 97 135 174 213 251 290 328 1,584
Scotland 11 33 65 109 152 196 239 283 326 369 1,781
UK 12 36 72 121 169 217 266 314 362 410 1,979
Source: Consultant Calculations
Option 3: Cumulative Numbers of Workers Per Annum with Salary Uplift
Year/
Residence
34-35 35-36 36-37 37-38 38-39 39-40 40-41 41-42 42-43 43-44 Total
Number of
Annual
Page 90

Page 91

Page 79 of 142 
Salary
Uplifts 
Moray  11 32 65 108 162 216 270 324 378 433 1,999
Scotland 12 36 73 122 182 243 304 365 426 487 2,249
UK 14 41 81 135 203 270 338 405 473 541 2,499
Source: Consultant Calculations
Option 4: Cumulative Numbers of Workers Per Annum with Salary Uplift
Year/
Residence
34-35 35-36 36-37 37-38 38-39 39-40 40-41 41-42 42-43 43-44 Total
Number of
Annual
Salary
Uplifts 
Moray  16 34 73 132 212 293 373 453 533 613 2,733
Scotland 18 38 82 149 239 329 420 510 600 690 3,074
UK 20 42 91 165 265 366 466 566 667 767 3,416
Source: Consultant Calculations
The table below presents the uplift in salary benefits for each option, at the Moray,
Scotland, and UK levels. It shows that Option 4 presents a considerably higher Net
Present Value at all geographical levels.
Uplift In Salary Benefits (£,000, NPV)
Option 1 2 3 4
12-year benefit stream
NPV (Moray) - 7,702 9,861 13,623
NPV (Scotland) - 8,664 11,093 15,326
NPV (UK) - 9,627 12,326 17,029
10-year benefit stream
NPV (Moray) - 5,418 6,814 9,280
NPV (Scotland) - 6,095 7,666 10,440
NPV (UK) - 6,773 8,518 11,600
Source: Consultant Calculations
Benefit 2: Income multiplier
Based on the OBC work, a multiplier was applied to the total salary uplift per year. This
captures the induced income impacts of the salary uplift in the economy. The
multipliers applied were:
• Moray: 1.11
• Scotland: 1.14
• UK: 1.25
To calculate the indirect and induced effects of the salary uplift the relevant spatial
income multiplier has been applied to the salary uplift for each option resulting in the
benefits outlined below. These are additional impacts from indirect and induced
income over and above the direct salary benefits. As with salary uplift benefits, Option
4 presents the highest benefits.
Page 91

Page 92

Page 80 of 142 
Income Multiplier Benefits (£,000, NPV)
Option 1 2 3 4
12-year benefit stream
NPV (Moray) - 847 1,085 1,499
NPV (Scotland) - 1,213 1,553 2,146
NPV (UK) - 2,407 3,082 4,257
10-year benefit stream
NPV (Moray) - 596 750 1,021
NPV (Scotland) - 853 1,073 1,462
NPV (UK) - 1,693 2,129 2,900
Source: Consultant Calculations
Benefit 3: Unemployment prevention
It is expected that as the economy automates, and due to Moray’s dependence on
manufacturing employment, the unemployment rate will increase due to a mismatch
between skills supply and demand.
For context, in 2023 there were approximately 6,200 employees working in
manufacturing in Moray79. A report by Oxford Economics80 stated that in the EU28, 2
million manufacturing jobs are at risk from automation by 2030. This would equate to
6.67% of jobs lost over a ten-year period. The Highlands and Islands can be viewed
as particularly vulnerable due to its current relative lack of automation. 
Automation at a rate of c30 employees a year equates to a job loss rate of around
0.5% per year (i.e. annually 0.5% of low skilled jobs in manufacturing would be lost),
recognising that it is likely that this figure will be either higher or lower in some years. 
The figure of 0.5% per year is less than the total number of jobs that will be lost. This
project alone will not be able to transition all unemployment lost to automation into
higher skilled employment. However, it will prevent some future unemployment by
upskilling the future workforce with a greater number of STEM qualifications. 
For Option 4 it is estimated that 30 unemployment’s per annum can be prevented. This
figure is seen as reasonable in the context of the current size of the Moray
manufacturing sector and the transition to more advanced manufacturing activities.
The amount of unemployment reduced under Option 2 is estimated as 20 per annum
and 25 per annum under Option 3. This reflects the greater number of STEM
qualifications in the labour market under Option 4. 
By addressing STEM issues there is a measurable benefit to the public purse from not
having to provide unemployment benefits and maximising tax and National Insurance
income. The total impact of providing unemployment benefits (as well as the losses to
the public purse incurred from individuals not being in employment, and therefore not
paying income tax or National Insurance) per annum per individual comprises the
following (rounded to whole numbers):
• Universal Credit: £10,335.
• Council Tax Credit: £830. 
79 Skills Development Scotland: Regional Skills Assessment: Moray Growth Deal
80 https://www.oxfordeconomics.com/wp-content/uploads/2023/07/HowRobotsChangetheWorld.pdf 
Page 92

Page 93

Page 81 of 142 
• Loss of Income Tax payments: £2,825.
• Loss of Employee National Insurance payments: £1,702.
• Loss of Employer’s National Insurance payments: £3,402.
Thus, the total value of this is £19,094 per individual per annum81. They accrue to
the three geographies as follows: 
• Moray: £830
• Scotland: £3,655
• UK: £19,094
This reflects that some of the savings will accrue to organisations outside Moray. That
is in other parts of Scotland (e.g. loss of Income Tax) or outside Scotland (e.g. loss of
National Insurance payments to UK Government).
The estimated amount of individual unemployment prevented in each year is, on a
cumulative basis up until Year 10 of the benefit stream, where after the numbers in
Year 11 and Year 12 remain the same as in Year 10 as follows:
• Option 2: 20
• Option 3: 25
• Option 4: 30
The tables below show the underlying calculations for the unemployment savings
benefits.
Option 2: Annual Benefit by Geographical Area (£,000)
Year Number of
Unemployment’s
Avoided Per Year
(Cumulative)
Moray Scotland UK
1 20 17 73 382
2 40 33 146 764
3 60 50 219 1,146
4 80 66 292 1,528
5 100 83 366 1,909
6 120 100 438 2,291
7 140 116 512 2,673
8 160 133 585 3,055
9 180 149 658 3,436
10 200 166 731 3,818
Total Cumulative Benefits
Undiscounted (£,000)
913 4,020 21,002 
81 Figures for NI and Income Tax were calculated based on the median salary for Moray in 2023
(£26,750).  Tax and NI calculations were undertaken using
https://www.thesalarycalculator.co.uk/salary.php.  Universal Credit and Council Tax Credit
entitlements were based on an assumed “persona” that was a single individual, aged 19, with no
dependents, living alone in a one-bed property with rent around £500pcm (average for a 1-bed flat in
Elgin), eligible for JSA and housing benefits, with no disability, other benefits or other income and
calculated using: https://www.entitledto.co.uk/benefits-calculator/
Page 93

Page 94

Page 82 of 142 
Total Cumulative Benefits
Discounted (£,000)
461 2,028 10,594
Source: Consultant Calculations
Option 3: Annual Benefit by Geographical Area (£,000)
Year Number of
Unemployment’s
Avoided Per Year
(Cumulative)
Moray Scotland UK
1 25 21 91 477
2 50 42 183 955
3 75 62 274 1,432
4 100 83 366 1,909
5 125 104 457 2,387
6 150 124 548 2,864
7 175 145 639 3,341
8 200 166 731 3,819
9 225 186 822 4,296
10 250 208 914 4,774
Total Cumulative Benefits
Undiscounted (£,000)
1,141 5,025 26,254
Total Cumulative Benefits
Discounted (£,000)
576 2,535 13,243
Source: Consultant Calculations
Option 4: Annual Benefit by Geographical Area (£,000)
Year Number of
Unemployment’s
Avoided Per Year
(Cumulative)
Moray Scotland UK
1 30 25 110 573
2 60 50 219 1,146
3 90 75 329 1,718
4 120 100 439 2,291
5 150 125 548 2,864
6 180 150 658 3,437
7 210 174 768 4,010
8 240 199 877 4,583
9 270 224 987 5,155
10 300 249 1,096 5,728
Total Cumulative Benefits
Undiscounted (£,000)
1,371
6,031
31,505
Total Cumulative Benefits
Discounted (£,000)
691 3,042 15,891
Source: Consultant Calculations
Taking the above estimations of cost savings in unemployment prevention and the
estimated scale of unemployment prevented by each option. The table below presents
the benefits of each option at the Moray, Scotland, and UK levels.
Page 94

Page 95

Page 83 of 142 
Unemployment Benefits (£,000, NPV)
Option 1 2 3 4
12-year benefit steam
NPV (Moray) - 603 754 905
NPV (Scotland) - 2,657 3,322 3,986
NPV (UK) - 13,882 17,353 20,824
10-year benefit stream
NPV (Moray) - 461 576 691
NPV (Scotland) - 2,028 2,535 3,042
NPV (UK) - 10,594 13,243 15,891
Source: Consultant Calculations
The unemployed prevention benefits in Moray are modest because only the saving of
the Council Tax Credit element would be retained there. Likewise, the levels of
unemployment prevention benefits for Scotland are relatively modest because most
of them accrue at the UK level rather than the Scotland level. The unemployment
prevention benefits at the UK level are much higher than at the Moray and Scottish
levels because they include all of the five types of benefits described above.
Summary of benefits
A summary of the benefits accrued at the Moray level is displayed in the table below.
Option 4 (the preferred option) has the highest level of benefits. These are over 35%
greater than Option 3 and around 75% above those of Option 2. The benefits largely
comprise the uplift in salary. The NPV of benefits in the 12-year benefit stream are
more than 40% higher than those of the 10-year benefit stream, illustrating the
potential cumulative growth in the benefits.
Summary of Moray Benefits (£,000, NPV)
Option/Benefit 1 2 3 4-Preferred
Option
12-year benefit stream
Uplift in salary - 7,702 9,861 13,623
Income multiplier - 847 1,085 1,499
Unemployment
prevention
- 603 754 905
Total - 9,152 11,700 16,027 
10-year benefit stream
Uplift in salary - 5,418 6,814 9,280
Income multiplier - 596 750 1,021
Unemployment
prevention
- 461 576 691
Total - 6,475 8,140 10,992
Source: Consultant Calculations
The table below shows a summary of the benefits accrued at the Scotland level. The
benefits arising from the preferred option (Option 4) are more than 70% of those in
Option 2 and around 33% above those in Option 3. The benefits largely compromise
the uplifts in salary. The NPV of the benefits in the 12-year stream, are around 40%
Page 95

Page 96

Page 84 of 142 
higher than those of the 10-year benefits stream, again illustrating the potential
cumulative growth in the benefits.
Summary of Scotland Benefits (£,000, NPV)
Option/Benefit 1 2 3 4-Preferred
Option
12-year benefit stream
Uplift in salary - 8,664  11,093 15,326
Income multiplier - 1,213 1,553 2,146
Unemployment
prevention
- 2,657 3,322 3,986
Total - 12,534 15,968 21,458
10-year benefit stream
Uplift in salary - 6,095 7,666 10,440
Income multiplier - 853 1,073 1,462
Unemployment
prevention
- 2,028 2,535 3,042
Total - 8,976 11,274 14,944
Source: Consultant Calculations
The table below displays the benefits that are gained from each option at the United
Kingdom (UK) level. As at the Moray and Scotland levels, Option 4 has the largest
benefits. They are around 25% higher than those for Option 3 and around 60% more
than those of Option 2. Unlike the Moray and Scotland levels, most of these benefits
come from unemployment prevention rather than uplifts in salary.
Summary of UK Benefits (£,000, NPV)
Option/Benefit 1 2 3 4-Preferred
Option
12-year benefit stream
Uplift in salary - 9,627 12,326 17,029
Income multiplier - 2,407 3,082 4,257
Unemployment
prevention
- 13,882 17,353 20,824
Total - 25,916 32,761 42,110
10-year benefit stream
Uplift in salary - 6,773 8,518 11,600
Income multiplier - 1,693 2,129 2,900
Unemployment
prevention
- 10,594 13,243 15,891
Total - 19,060 23,890 30,391
Source: Consultant Calculations
Displacement and Deadweight Analysis
It is not anticipated that the proposed development will cause displacement as it seeks
to both complement existing infrastructure and create new provision where little or
none exists currently. The target users and beneficiaries of the development are
primarily Moray-based, and therefore activity delivered elsewhere outside of the local
authority area will not be displaced.  
Page 96

Page 97

Page 85 of 142 
Similarly, as the activity proposed represents entirely new activity for the region in
terms of Early Years STEM provision, there is not likely to be any deadweight loss that
is attributable to the development. Specifically: 
• The proposed STEM centres represent an entirely new development for the
local authority of Moray, by providing infrastructure and facilities that are not
currently offered in the region, namely the main STEM Discovery Centre in
Elgin, the Outdoor Environmental Education Centre, and the satellite sites
in Buckie and Forres.
• The mobile outreach offering will deliver STEM learning that otherwise
would not be possible to more remote areas of Moray, reducing rural
inequalities.
• Content of lessons delivered in these Early Year STEM centres and the
overall quality engagements in each learner’s journey will be
complementary and additional to the traditional educational pathways in
STEM learning for pre-school, primary school and early BGE phase pupils
in secondary school.
Benefit Cost Ratios
Taking the above information in relation to cost and benefits into account, a Benefits
Cost Ratio (BCR) can be calculated for each of the options at each spatial level. The
tables below demonstrate the BCRs at the Moray, Scotland, and UK levels.
At the Moray level Option 4 (the preferred option) has a BCR that is above the other
two options-for both the 10-year and 12-year benefit streams. The preferred option
also has higher BCRs at the Scotland level than the other two options.  At the UK level,
each option has a BCR of around 5.0 or higher.
Moray Costs and Benefits (£,000, NPV)
Option/Benefit 1 2 3 4-Preferred
Option
12-year benefit stream
Total Benefit - 9,152 11,700 16,027
Total Costs - 3,671 4,868 5,233
Benefit Cost Ratio - 2.5 2.4 3.1
10-year benefit stream
Total Benefit - 6,475 8,140 10,992
Total Costs - 3,671 4,868 5,233
Benefit Cost Ratio - 1.8 1.7 2.1
Source: Consultant Calculations
Page 97

Page 98

Page 86 of 142 
Scotland Costs and Benefits (£,000, NPV)
Option/Benefit 1 2 3 4-Preferred
Option
12-year benefit stream
Total Benefit - 12,534 15,968 21,458
Total Costs - 3,671 4,868 5,233
Benefit Cost Ratio - 3.4 3.3 4.1
10-year benefit stream
Total Benefit - 8,976 11,274 14,944
Total Costs - 3,671 4,868 5,233
Benefit Cost Ratio - 2.4 2.3 2.9
Source: Consultant Calculations
UK Costs and Benefits (£,000, NPV)
Option/Benefit 1 2 3 4-Preferred
Option
12-year benefit stream
Total Benefit - 25,916 32,761 42,110
Total Costs - 3,671 4,868 5,233
Benefit Cost Ratio - 7.1 6.7 8.0
10-year benefit stream
Total Benefit - 19,060 23,890 30,391
Total Costs - 3,671 4,868 5,233
Benefit Cost Ratio - 5.2 4.9 5.8
Source: Consultant Calculations
The Benefit Cost Ratios are provided for each spatial and option in the table below. 
As shown, Option 4 is clearly the option that presents the greatest benefit at all
levels. Option 2 performs quite closely to Option 3, although this is due to a
significantly lower project cost for development than Option 3.  
Comparison of Options: BCR
Option/Benefit Moray Level Scotland
Level
UK Level
12-year benefit stream
1-Business as Usual - - -
2 1.8 2.4 5.2
3 1.7 2.3 4.9
4-Preferred Option 2.1 2.9 5.8
10-year benefit stream
1-Business as Usual - - -
2 2.5 3.4 7.1
3 2.4 3.3 6.7
4-Preferred Option 3.1 4.1 8.0
Source: Consultant Calculations 
Page 98

Page 99

Page 87 of 142 
Optimism Bias 
As noted earlier, the project costs include a 15% uplift to reflect optimism bias in the
construction costs. Optimism bias of 15% was selected based on QS estimates
provided by the Moray Council (construction in phase 1 involves light renovation of a
known building).  
In addition, we applied optimism bias to the values of the benefits of salary uplift and
reduction in benefit payments to those who would otherwise become unemployed. It
had initially been assumed that each of these two benefits would rise by 1% per year
(compound) in real terms from 2024-2025 onwards. However, these were removed to
avoid the impacts being over optimistic. 
The effect of our assumption that the salaries and benefits paid to the unemployed
would not increase or decrease in real terms is to reduce the overall benefits:
• By c18% to the levels of benefits shown in the results for the 10-year benefits
stream.
• By c20% to the levels of benefits shown in the results for the 12-year benefits
stream. 
Sensitivity Analysis for the Preferred Option 
Sensitivity analysis has been undertaken to examine the impacts of changes to key
variables on the BCRs of Option 4 (the preferred option). The first sensitivity test was
a 25% reduction in the number of people in employment with a salary uplift. This was
undertaken for each of the Moray, Scotland and the UK levels, and separately for each
of the 10-year benefit stream and the 12-year benefit stream. The results are shown
in the table below: 
Page 99

Page 100

Page 88 of 142 
Option 4: Sensitivity Test: 25% reduction in number of workers with a salary uplift
Sensitivity Costs
(£,000
NPV)
Benefits
(£,000
NPV)
BCR
12-year benefit stream
Moray central estimate 5,233 16,027 3.1
Moray with reduction in number of salary uplifts 5,233 12,247 2.3    
Scotland central estimate 5,233 21,458 4.1
Scotland with reduction in number of salary
uplifts
5,233 17,090 3.3    
UK central estimate 5,233 42,110 8.0
UK with reduction in number of salary uplifts 5,233 36,789 7.0
10-year benefit stream
Moray central estimate 5,233 10,991 2.1
Moray with reduction in number of salary uplifts 5,233 8,416 1.6    
Scotland central estimate 5,233 14,943 2.9
Scotland with reduction in number of salary
uplifts
5,233 11,967 2.3    
UK central estimate 5,233 30,391 6.8
UK with reduction in number of salary uplifts 5,233 26,766 5.1
Source: Consultant Calculations
The outcome is that the reductions in the BCRs do not result in a significant change in
the overall results. The lowest BCR is in the 10-year benefit stream for Moray where
the BCR falls from 2.1 to 1.6.  
The second sensitivity test was reducing the number of employments avoided by 30%
from the central estimates. The results are set out at Table 3.24. The reductions in the
Moray and Scotland level BCRs are slight and overall-and all remain at above 2.0.
Page 100

Page 101

Page 89 of 142 
Option 4: Sensitivity Test: 30% reduction in number of unemployment’s avoided
Sensitivity Costs
(£,000
NPV)
Benefits
(£,000
NPV)
BCR
12-year benefit stream
Moray central estimate 5,233 16,027 3.1
Moray with reduction in number of
unemployment’s avoided
5,233 15,737 3.0    
Scotland central estimate 5,233 21,458 4.1
Scotland with reduction in number of
unemployment’s avoided
5,233 20,262 3.9    
UK central estimate 5,233 42,110 8.0
UK with reduction in number of
unemployment’s avoided
5,233 35,863 6.9
10-year benefit stream
Moray central estimate 5,233 10,991 2.1
Moray with reduction in number of
unemployment’s avoided
5,233 10,784 2.1    
Scotland central estimate 5,233 14,943 2.9
Scotland with reduction in number of
unemployment’s avoided
5,233 14,031 2.7    
UK central estimate 5,233 30,391 5.8
UK with reduction in number of
unemployment’s avoided
5,233 25,624 4.9 
Source: Consultant Calculations 
The table below combines the effect of reducing both the number of people in
employment with a salary uplift and the number of unemployment’s avoided.   
Page 101

Page 102

Page 90 of 142 
Option 4: Sensitivity Test: 25% reduction in the number of workers with salary
uplifts and a 30% reduction in number of unemployment’s avoided
Sensitivity Costs
(£,000
NPV)
Benefits
(£,000
NPV)
BCR
12-year benefit stream
Moray central estimate 5,233 16,027 3.1
Moray with sensitivity tests applied 5,233 11,957 2.3    
Scotland central estimate 5,233 21,458 4.1
Scotland with sensitivity tests applied 5,233 15,894 3.0    
UK central estimate 5,233 42,110 8.0
UK with sensitivity tests applied 5,233 30,542 5.8
10-year benefit stream
Moray central estimate 5,233 10,991 2.1
Moray with sensitivity tests applied 5,233 8,209 1.6    
Scotland central estimate 5,233 14,943 2.9
Scotland with sensitivity tests applied 5,233 11,056 2.1    
UK central estimate 5,233 30,391 5.8
UK with sensitivity tests applied 5,233 21,999 4.2
Source: Consultant Calculations
The results show that the BCRs are still generally favourable with the lowest being 10-
year benefit stream estimates in Moray and Scotland which are 1.6 and 2.1,
respectively.
Lastly, we have considered the impact of cost of a 20% rise in the project cost in
addition to the reductions in activity shown in the results at Table 3.25. The effects of
this are shown at Table 3.26. 
Page 102

Page 103

Page 91 of 142 
Option 4: Sensitivity Test: 25% reduction in the number of workers with salary
uplifts and a 30% reduction in number of unemployment’s avoided, plus a 20%
increase in project costs
Sensitivity Costs
(£,000
NPV)
Benefits
(£,000
NPV)
BCR
12-year benefit stream
Moray central estimate 5,233 16,027 3.1
Moray with sensitivity tests applied 6,280 11,957 1.9    
Scotland central estimate 5,233 21,458 4.1
Scotland with sensitivity tests applied 6,280 15,894 2.5    
UK central estimate 5,233 42,110 8.0
UK with sensitivity tests applied 6,280 30,542 4.9
10-year benefit stream
Moray central estimate 5,233 10,991 2.1
Moray with sensitivity tests applied 6,280 8,209 1.3    
Scotland central estimate 5,233 14,943 2.9
Scotland with sensitivity tests applied 6,280 11,056 1.8    
UK central estimate 5,233 30,391 5.8
UK with sensitivity tests applied 6,280 21,999 3.5
Source: Consultant Calculations 
In Moray the BCRs fall to below 2.0 for both the 10 year (1.3) and 12-year benefit
streams (1.9). However, they are both more than 1.0. 
The BCRs for Scotland are between 1.8 (10-year benefit stream) and 2.5 (12-year
benefit stream). At the UK level, each of the two BCRs are above 3.0. 
Employment and GVA impacts in Moray
As part of this appraisal, an assessment of the GVA and employment impacts arising
from project expenditures on suppliers and the wider supply chain in Moray has been
conducted. This expenditure relates to:
• Capital spend
• Revenue spend (excluding staffing)
• Staffing for the project
Direct impacts were calculated based on the capital and revenue spend associated
with each option. Through existing knowledge, and information provided by Moray
Council, specific purchases were allocated to Moray suppliers. These include
construction works, partner investment and operating costs of facilities. 
Page 103

Page 104

Page 92 of 142 
The financial values were converted into direct employment and GVA impacts by
applying sectoral averages of spend to employment and GVA from the Scottish Annual
Business Survey82.
Indirect and induced impacts were calculated based on relevant multipliers from the
2019 Scottish Government Input-Output Tables83. These Scottish level multipliers
were adjusted for leakage-i.e. to allow for impacts taking place outside Moray (e.g.
use of suppliers based elsewhere in Scotland).  
The factors used for Moray were as follows:
• Indirect multipliers: 40% of the Scottish multiplier
• Induced multipliers: 70% of the Scottish multiplier
The table below provides an assessment of the employment impacts in Moray arising
from the various project expenditures, expressed in FTE job years.84 As shown, Option
4 delivers the highest number of job years (39), reflecting the higher number of project
staff required than in the other two options. Employment impacts for Option 2 are
considerably lower than in the other two options.
Employment Impacts in Moray from Project Expenditures (FTE Job Years)
Expenditure/Option 1 2 3 4
Spend on Capital Items - 3 16 17
Spend on Revenue Items - <1 4 2
Project Staff - 8 14 20
Total - 11 34 39
Source: Consultant Calculations
The table below provides an overview of the expected gross value added (GVA)
impacts arising from project expenditures on capital and revenue items. The GVA
impacts for Option 3 and Option 4 are very similar at around £1.5 million with Option
3 presenting slightly higher impacts being realised. Again, the impacts for Option 2 are
much lower.
GVA Impacts in Moray from Project Expenditures (£,000)
Expenditure/Option 1 2 3 4
Spend on Capital Items - 94 1,244 1,328
Spend on Revenue Items - 36 257 166
Total - 131 1,501 1,494
Source: Consultant Calculations 
82 These were for the following sectors/SOC codes: 85 Education, 71 Architectural Fees, 41
Renovation & Redevelopment, 45 Mobile Solution & Outreach Vehicle Purchase, Wrapping, Retrofit &
Charging Point, 73 Branding & Marketing, 68 Rent & Rates, 81 Cleaning costs, 77 Mobile Solution
Running Costs.
83 These covered the sectors for which direct impacts were calculated. For project staffing spend all
calculations were based on project budgets.
84 FTE job years are a measure of employment, equivalent to one person being employed for an
entire year. Job years are rounded to the nearest whole number
Page 104

Page 105

Page 93 of 142 
Qualitative Benefits Appraisal
A wide range of additional, qualitative benefits will be accrued from the proposed
development, beyond the economic impacts identified earlier in this appraisal.  The
economic impacts from the proposed development only partially reflect its overall
value. It is anticipated that additional quantifiable wider benefits may be realised
through the operational phase of the Programme.  These benefits can be seen across
a wide range of themes, including productivity, people, population, place, and Fairer
Scotland Duty.
The wider socio-economic and qualitative benefits have been taken from the Full
Business Case’s Benefits Realisation Plan.
Anticipated Qualitative Benefits
As part of the development of the Full Business Case, a Benefits Realisation Plan has
been developed to capture, measure and review progress against anticipated benefits.
The benefits that are anticipated (and not explicitly aligned to quantitative economic
benefits) are outlined in the table below.
Page 105

Page 106

Page 94 of 142 
Theme Coding Benefit
Productivity Prod.1 Increased alignment of workforce skills with business
requirements
Prod.5 Increased networking and connections between
businesses, communities and the education sector
People Peop.1 Increase in numeracy attainment by Moray pupils
across all levels
Peop.2 Increase in attainment of STEM subjects at National 5
or higher
Peop.3 Increase in positive leaver destinations of young
people
Peop.4 Increase in aspirations of young people to access
STEM related careers
Peop.5 Strengthening of Science Capital within families
Peop.6 Increase in skills within Moray’s education sector
Peop.7 Increase in training opportunities within Moray’s
education sector
Peop.8 Increase in skills levels of Moray residents
Peop.9 Increase in learning opportunities, activities and
events offered to young people and families
Peop.10 Increase in young people, families and communities
accessing inspirational learning environments
Peop.11 Increase in climate awareness of young people and
the wider community
Peop.12 Increase in awareness of Moray’s residents of the
STEM career opportunities in Moray’s local economy
Peop.13 Increase in community and employer participation in
the upskilling of young people
Population Pop.1 Increase in Health and Wellbeing of young people
Place Plac.1 Increased access to specialist learning facilities and
digital infrastructure to support learning pathways
across all ages
Plac.2 Improvement of local services and facilities access by
the public
Plac.3 Town centre regeneration and increase in town centre
activity
Fairer Scotland
Duty
Fair.1 Increased access through building design
Fair.2 Reduction in rural inequality 
To appraise each of the options against the benefits, a weighted score has been
attributed to the benefits to reflect the relative importance of each qualitative benefits. 
To provide relative balance, some of the benefits have been conflated (for example,
the benefits focusing on increased numeracy attainment, increased STEM attainment
and increase in skills levels of Moray residents have been grouped together as
“Increasing attainment / skills levels”). Where there have been any groupings, a
proportionate weighting of 10% has been attributed to reflect that multiple benefits
found within the qualitative benefits register will be addressed as one of these
Page 106

Page 107

Page 95 of 142 
rationalised benefits. A 10% weighting has also been attributed to the “Reduction in
rural inequality” benefit, reflecting the importance placed on ensuring rural equity
concerns are addressed during options shortlisting conversations.
The groupings, descriptions and weightings attributed to each benefit are provided in
the table below.
Theme Benefit
Code(s)
Benefit Description Weighting
Productivity Prod.1 Increased alignment of
workforce skills with business
requirements
5%
Prod.5 Increased networking and
connections between
businesses, communities, and
the education sector
5%
People Peop.1;
Peop.2;
Peop.8
Increasing attainment / skills
levels
10%
Peop.3;
Peop.4;
Peop.12
Increasing awareness and
outcomes in STEM career
pathways
10%
Peop.5 Strengthening of Science
Capital within families
5%
Peop.6;
Peop.7
Improvements to Moray’s
education sector
10%
Peop.9:
Peop.10
Increased access to inspirational
learning environments and
activities
10%
Peop.11 Increase in climate awareness of
young people and the wider
community
5%
Peop.13 Increase in community and
employer participation in the
upskilling of young people
5%
Population Pop.1 Increase in Health and
Wellbeing of young people
5%
Place Plac.1 Increased access to specialist
learning facilities and digital
infrastructure to support learning
pathways across all ages
5%
Plac.2 Improvement of local services
and facilities access by the
public
5%
Plac.3 Town centre regeneration and
increase in town centre activity
5%
Fairer Scotland Duty Fair.1 Increased access through
building design
5%
Fair.2 Reduction in rural inequality 10% 
Page 107

Page 108

Page 96 of 142 
Appraisal
The likelihood of each option delivering against each of these anticipated conflated
benefits has been evaluated systematically in the table below, with scores based on
the alignment of each option with the feasibility and magnitude to which each option
delivers on these benefits. The scores range from 0 to 5, with 5 indicating strong
alignment and 0 indicating no alignment. A narrative summary of this assessment for
each option (against the core themes of Productivity, People, Population, Place and
Fairer Scotland Duty) is provided below the table.
Options 1 and 5 had already been discounted in earlier sections of the Full Business
Case. This has been on the basis that Option 1 presents little evidence of impact, is
uncoordinated and duplicates activity amongst providers; and the demand for Option
5 has been tested in engagement with education staff who indicated limited utilisation
of fixed facilities in rural areas (with a preference for flexible mobile solutions). Neither
Option represents a value for money solution, with duplication in Option 1 and
underutilisation in Option 5, and both were therefore discounted from the economic
appraisal.
Given this prior discounting of Options 1 and 5, this qualitative appraisal considers the
potential benefits that can be derived from Option 2, Option 3, and Option 4 only. 
Page 108

Page 109

Page 97 of 142 
Theme Coding Option 2 Option 3 Option 4
Raw (R) and Weighted (W)
Scores
R W R W R W
Productivity Prod.1 1 0.05 3 0.15 3 0.15
Prod.5 2 0.1 4 0.2 5 0.25
People Peop.1;
Peop.2;
Peop.8
2 0.2 3 0.3 4 0.4
Peop.3;
Peop.4;
Peop.12
2 0.2 3 0.3 5 0.5
Peop.5 1 0.05 2 0.1 4 0.2
Peop.6;
Peop.7
2 0.2 4 0.4 4 0.2
Peop.9;
Peop.10
2 0.2 3 0.3 4 0.2
Peop.11 1 0.05 2 0.1 5 0.25
Peop.13 2 0.1 3 0.15 4 0.2
Population Pop.1 1 0.05 2 0.1 4 0.2
Place Plac.1 1 0.05 4 0.2 5 0.25
Plac.2 0 0 4 0.2 5 0.25
Plac.3 0 0 4 0.2 4 0.2
Fairer Scotland
Duty
Fair.1 0 0 4 0.2 5 0.25
Fair.2 3 0.3 4 0.4 5 0.5
Total Score 20 1.55 49 3.3 66 4.4
Weighted % 31% 66% 88% 
Option 2 – Minimum 
Option 2 relates to the provision of a Hub in each of the early learning and primary
settings across Moray (to develop STEM learning environments and purchase STEM
equipment), the provision of a specialist mobile vehicle offering, and a portion
allocated to investment in partner activities, events, and equipment.
On productivity, there may be a small increase in the level of STEM activity delivered
by the council. This will primarily be driven by the provision of Hubs in early learning
and primary settings. The specialist mobile vehicle offering will also increase STEM
activity, whilst partnership activity will positively impact networking opportunities and
connections between businesses, communities, and the education sector. 
On people, there may be an improvement around the awareness of STEM education
and resources that will result from the Hubs and the mobile solution. The accessibility
of STEM learning environments and resources will increase which will benefit learners,
to a certain extent, and learner’s STEM skills.
Page 109

Page 110

Page 98 of 142 
On population, there may be a minimal improvement in the health and wellbeing of
young people in the region. This will be felt more strongly amongst young people that
have not had any exposure to STEM education. 
On place, there may be minimal impact on facilities, local services, and town centre
regeneration. The Hubs will be based in Early Learning and Childcare (ELC), and
primary settings so will likely not be accessible to the public nor feature in town centres.
Consequently, Plac.2 and Plac.3 have been scored zero. 
On Fairer Scotland Duty, rural inequality may be reduced by the mobile vehicle offering
and partnership events. Improvements in building design will be unaffected by Option
2 as the hubs will be based in previously designed and constructed settings so Fair.2
has been scored zero. 
In total, Option 2 had a weighted scoring of 31%, the lowest score allocated across
each option. 
Option 3 – Intermediate
Option 3 refers to the provision of one central Hub (a Moray STEM Centre with
dedicated exhibition space and a community learning hub), the provision of a specialist
mobile vehicle to act as a mobile “pop-up STEM centre” with a robust outreach
provision (including digital delivery and a central repository of STEM resources) and a
portion allocated to investment in partner activities, events, and equipment. As such,
Prod.5 has been scored as four. 
On productivity, there may be a sizeable increase in opportunities for collaboration
between business, communities, and the education sector that results from the
development of Option 3. The development of a central hub will play a key part in this
boost in STEM productivity in the region.
On people, there may be a significant boost to the delivery and accessibility of STEM
education in the region resulting from Option 3. This could significantly improve
opportunities for young people to upskill in STEM and elevate Moray’s STEM
education offering with the central hub acting as the catalyst for an increase in STEM
learning and awareness. 
On population, the health and wellbeing of young people in Moray may improve if there
is sufficient demand for the central hub over an extended period. An increase in
wellbeing could mainly derive from those that are already engaging with STEM. The
provision of a hub will significantly improve the educational wellbeing of these young
people. Those that have not already engaged significantly with STEM learning may be
positively impacted by the robust outreach provision. This can help to ensure that there
is equal access to STEM opportunities for young people across Moray.
There may be a significant boost to place-based benefits if Option 3 is developed. The
building of a central hub which will be accessible to the public and situated in the town
centre has resulted in Plac.1, Plac.2, and Plac.3 being scored as four each. Local
STEM facilities could benefit extensively from the development of a town centre hub. 
Page 110

Page 111

Page 99 of 142 
Fairer Scotland Duty benefits may be increased through the building design of the
central hub. A reduction in rural inequality may also follow the development of Option
3 through the specialist mobile vehicle and ‘pop-up’ STEM offer. An effective mobile
offer can improve accessibility to STEM education in rural settings and breakdown
geographical barriers due to the cost and time associated with transport. 
In total, Option 3 had a weighted scoring of 66%.
Option 4 – Intermediate (Preferred)
Option 4 relates to the provision of a network of STEM facilities in targeted locations
across Moray, with the development of one central Moray STEM Centre with dedicated
exhibition space and a community learning hub, a network of satellite sites extending
the reach of engagements, and the delivery of a bespoke Environmental Education
Centre specialising in outdoor and sustainability learning.  Also included in this Option
is the specialist mobile vehicle and robust outreach offering expressed in Option 3,
and the allocation of funding for partner events, equipment and facilities outlined in
Options 2 and 3. 
On productivity, the development of Option 4 could significantly increase the
opportunity for STEM networking connections. The provision of coordinating STEM
facilities in targeted locations across the region could cement STEM education
ecosystem which positively impacts businesses, communities, and the education
sector. Satellite sites and the specialist vehicle will help to promote STEM productivity
across the region. Consequently, Prod.5 has been scored as five.
On people, Option 4 scores well across each benefit. Increasing awareness and
outcomes in STEM career pathways may be developed through the coordinated
network of facilities, the central hub, the mobile offer, and the events and equipment.
Increase in climate awareness of young people and the wider community may be
significantly impacted by the development of a bespoke Environmental Education
Centre. The proposed centre will specialise in outdoor and sustainability learning
which can help to boost young people’s awareness of environmental challenges and
the ways in which STEM can address these challenges. 
On population, a significant increase in wellbeing may be induced by the development
of Option 4. If STEM engagement is targeted at specific communities and individuals
that will benefit from STEM learning, then their overall wellbeing can be positively
impacted. 
On place, there may be significant benefits derived from the development of Option 4.
In particular, the development of one central Moray STEM Centre and the delivery of
a bespoke Environmental Education Centre may increase access to specialist learning
facilities to a significant extent. Improvements to local services and facilities accessible
to the public will also benefit from Option 4 as will the town centre. 
On Fairer Scotland Duty, targeted STEM facilities, proposed as part of Option 4, can
drastically reduce rural inequality (in terms of access to STEM education). Increased
Page 111

Page 112

Page 100 of 142 
access through building design will also be positively impacted by Option 4 due to the
construction and delivery of bespoke and specialist STEM spaces.
In total, Option 4 had a weighted scoring of 88%, the highest score across each option.
The proposed delivery of a bespoke Environmental Education Centre and proposed
targeted STEM facilities had significant influence on the scoring of the benefits derived
from Option 4. This is in addition to the network of satellite sites, the mobile offer, and
the robust outreach offering expressed in other options. 
Carbon Impacts
At this stage, a carbon assessment for the embodied carbon of construction during the
project has been undertaken in the first instance. The main capital carbon-generating
elements of this project are the proposed development of STEM or education centres
/ hubs, satellite sites, and the mobile solution proposed for Option 4. 
For the development of a large central co-ordinating hub hosted at Elgin Library an
input proxy for embodied tCO2e of 0.69 has been used.85 We have assumed a total
construction footprint of 300m2 which gives an estimated total of embodied tCO2e for
one item as 207.86 An input proxy, for annual energy use for this item, of 125 kWh/m2
has been used so the operational carbon at 300m2 is estimated as 37,500 kWh.87
For the development of the mobile “pop-up” offer (3.5 tonne EV vehicle), serving
Speyside and rural areas, an input proxy for embodied tCO2e of 8.8 has been used.88
We have not assumed a total construction area footprint so an estimated total of
embodied tCO2e for one item as 8.8. An input proxy, for annual energy use for this
item, of 3,750 kWh/m2 has been used so the operational carbon is estimated as 3,750
kWh.89
For the development of satellite sites (such as sites at Buckie and Forres) an input
proxy for embodied tCO2e of 0.485 has been used.90 We have assumed a total
construction footprint of 150m2 which gives an estimated total of embodied tCO2e for
one item as 72.75. Total of embodied tCO2e for two items is estimated as 145.5. An 
85 Local or neighbourhood centre: https://www.ucl.ac.uk/urban-lab/publications/2014/oct/demolition-or-
refurbishment-social-housing 
86 The estimated embodied carbon values presented in this section do not include an additional
contingency percentage to cover missing fittings, coverings, installations, etc.
87 Proxy annual energy use from European Commission on energy consumption per m2 for non-
residential buildings (proxy figure divided by two to reflect part time operation of the facility):
https://energy.ec.europa.eu/index_en 
88 https://www.zemo.org.uk/assets/workingdocuments/MC-P-11-
15a%20Lifecycle%20emissions%20report.pdf 
89 Proxy energy consumption estimated from LDV EV80 electric 3.5 tonne van data sheet based on
one full charge mileage used each week for 48 working weeks: https://myldv.co.uk/ev80-spec-sheets/. 
90 Library or community centre: https://www.ucl.ac.uk/urban-lab/publications/2014/oct/demolition-or-
refurbishment-social-housing 
Page 112

Page 113

Page 101 of 142 
input proxy, for annual energy use for this item, of 125 kWh/m2 has been used so the
operational carbon at 150m2 is estimated as 37,500 kWh.91
For the development of outdoor learning delivered in a local natural environment an
input proxy for embodied tCO2e of 0.01 has been used.92 We have assumed a total
construction footprint of 0m2 which gives an estimated total of embodied tCO2e for one
item as 0. An input proxy, for annual energy use for this item, of 0 kWh/m2 has been
used so the operational carbon at 0m2 is estimated as 0 kWh.93
The estimated total embodied tCO2e for the project described is 397.43. Total
operational tCO2e for project is 547.43. The estimated total energy use is 78,750 kWh.
This accounts for:
• 1 x large central co-ordinating hub hosted at Elgin Library and Mobile “pop-up”
offer serving Speyside and rural areas.
• 2 x satellite sites in Buckie and Forres
• 1 x Outdoor Education Centre, delivered in local natural environment.
The table below shows the carbon emissions, embodied and operational, for the
project. Total estimated monetised carbon values are also presented at 2028 prices in
low, central, and high scenarios.94 
Carbon Emissions Total estimated
carbon emissions
(tCO2e)
Total estimated monetised carbon
values (2028 prices)
Low Central High
Embodied 397 £54,050 £108,101 £162,151
Operational  547 £74,450 £148,901 £223,351
Total 945 £128,501 £257,002 £385,503
Source: ekosgen carbon assessment
The estimated total embodied carbon cost for the project (at 2028 values) is £108,101.
If carbon values are low, then the estimated total embodied carbon cost is £54,050
whereas if they are high then the estimated total embodied carbon cost is £162,151.
The estimated total operational carbon cost for the project (at 2028 values) is
£148,901. If carbon values are low, then the estimated total operational carbon cost is
£74,450 whereas if they are high then the estimated total operational carbon cost is
£223,351. 
91 Proxy annual energy use from European Commission on energy consumption per m2 for non-
residential buildings https://ec.europa.eu/energy/content/energy-consumption-m%C2%B2-2_en. 
92 Proxy tCO2e determined with an arbitrary figure to account for building type (outdoor shed).
93 Proxy energy consumption input as owing to the building type.
94 Data obtained from UK Government (2 September 2021) Policy Paper 'Valuation of greenhouse
gas emissions: for policy appraisal and evaluation'.
https://www.gov.uk/government/publications/valuing-greenhouse-gas-emissions-in-policy-
appraisal/valuation-of-greenhouse-gas-emissions-for-policy-appraisal-and-evaluation
Page 113

Page 114

Page 102 of 142 
The total estimated carbon cost for the project (at 2028 values) is £257,002. If carbon
values are low, then the estimated total carbon cost is £128,501 whereas if they are
high then the estimated total carbon cost is £385,503. 
Figure 15 Estimated carbon emissions (tCO2e) 2021 to 2046 Source: ekosgen carbon assessment 
Risk
The key risks associated with the preferred option have been identified and outlined
below: 
Risk type Risk Potential mitigation
Reputational risk No change in community
attitudes or regular repeat
visitations to STEM centre
infrastructure.
Improvements in STEM
attainment levels not
realised.   
Stakeholder consultation
throughout the design
process to understand
need and create a
resource that will attract
audiences. Flexible and
dynamic approach to
curriculum development
and project delivery. 
0
100
200
300
400
500
600
2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 2045
Embodied
Operational
Embodied + Operational (Control)
Embodied + Operational (Control) Cumulative
Page 114

Page 115

Page 103 of 142 
Risk type Risk Potential mitigation
Legal risk Inability to acquire sites or
develop partnership
agreements that satisfy
subsidy control
legislation. 
Regular and effective
communication with
partners and development
of Memorandums of
Understanding at an early
stage. Engage legal
support at an early stage
regarding subsidy
compliance. 
Planning risk Failure to get planning
consents or planning
processes delay
progress. 
Moray Council
architecture team
appointed to progress
phase 1 development
planning. Close liaison
across departments. 
Build risk Rising construction costs
and scope creep that
impact on deliverability of
the project that could
affect outcomes.  
Experienced architectural
team to provide budgets
and sound project
management. Phased
implementation that will
identify rising costs and
make early interventions
and value engineering. 
Project has been re-
scoped in response to
rising constructions costs
with fewer sites taken
forward for development.  
Project intelligence /
environmental risk
Unanticipated external
risks cause delays or
other impacts on project
performance. 
Regular liaison with key
stakeholders, including
Scottish and UK
governments. 
Procurement risk Delays caused by
procurement processes or
lack of suitable suppliers 
Early market engagement
and adherence to
established procurement
frameworks.  
Operational risk Difficulty recruiting and
retaining staff, inability to
develop volunteer
network, lack of
collaboration between
partners. 
STEM Coordinator posts
to offer flexible working
arrangements. Early
engagement with STEM
Ambassadors network,
partner providers, third
sector. 
Page 115

Page 116

Page 104 of 142 
Risk type Risk Potential mitigation
Demand risk The projected increase in
STEM jobs does not
materialise
Keep up to date with
latest labour market
developments
Utilities risk Required utilities are
constrained in selected
sites, higher cost of
provision of utilities. 
Early site investigations
and appropriate,
evidence-based cost
assumptions. 
Funding risk Anticipated MGD funding
from Scottish Government
and Moray Council is not
available or not available
at anticipated level.
Additional funding
sources cannot be
identified. 
Adherence to business
case processes and early
sighting on funding
requirements. Engage
STEM employers for
financial contribution.
Pursue external grant
awards throughout project
delivery. 
Revenue Risk Insufficient revenue
budget to realise project
scope, revenue costs
unaccounted for or higher
than predicted. 
Project has been
developed in line with
allocated revenue
budgets. Co-location and
partnership agreements
minimise ongoing
operational costs.
Revenue requirements for
limited staffing resource
met my Moray Council.
Additional funding
streams sources
throughout project
delivery. 
Page 116

Page 117

Page 105 of 142 
4. The Commercial Case 
Required Services 
These are as follows: 
Project element Detail
STEM Centre
Network 
Creation of state-of-the-art facilities hosted within community
settings across Moray, including a central hub in Morays
central public library at Elgin Cooper Park, and satellite sites
in the areas of Forres of Buckie.   
Required services include: 
• Site acquisition 
• Renovation and construction 
• Exhibition manufacture and installation 
• Fit out of furniture and ICT.
• Equipment Purchase 
Mobile Solution A mobile solution with specialist branding and fitted out with
mobile facilities and equipment, including portable exhibits. 
Required services include: 
• Purchase of a medium sized electric van
• Specialist fit out and branding.
• Purchase of mobile furniture and ICT equipment
• Manufacture of portable exhibits 
• Purchase of supplementary STEM equipment 
Outreach Programme A central repository of STEM resources available settings to
borrow for classroom-based STEM activity. 
Required services include:  
• Learning programme development
• Purchase of equipment and curation of themed kits. 
Environmental
Sciences STEM
Learning Centre
Creation of an Environmental Sciences STEM Learning
Centre, developed, and delivered in partnership with the
Local Environmental Charity Wild Things! 
Required services include: 
• Feasibility study
• Public consultation
• Court approval for change of land use
• Site acquisition and leasing arrangements
• Land development.
Page 117

Page 118

Page 106 of 142 
Partnership
Investment
(STEM Grant
Scheme)
A portion of Moray Growth Deal funding ring fenced to support
development of partner facilities and community-based
STEM programmes and events.  
Required services include: 
• Stakeholder engagement
• Development of STEM Grant Scheme 
Educational
Programme
Development of an educational programme that covers the
core curricular areas of Science, Technology and Numeracy
while introducing career pathways in the context of Moray’s
local economy. 
Required Services include: 
• Stakeholder engagement
• Learning programme development
• Digital portal development 
STEM Office A dedicated team of STEM Coordinators will be employed to
manage activity across all elements of the project, including
outreach, STEM delivery at the centres, and co-ordination of
partner activity. 
Required Services include: 
• Moray Council internal staff recruitment
or 
• Contract for Services 
Outline of the Students Journey 
Engagement with this STEM initiative starts early, with children as young as 3 invited
to a local STEM centre for an inspirational experience. The child, as part of their Early
Learning and Childcare (ELC) setting, will travel to an Early Years STEM Centre, either
by foot or by bus. A centre may include a fixed site within Buckie, Elgin or Forres, or a
pop-up facility in more rural locations. Travel can be arranged at no cost using the
young person’s bus pass, with recent investments as part of the Bus Revolution project
allowing public transport to become increasingly more accessible.  
On arrival the child will be greeted by a member of staff who will make introductions
and provide safety information. The child will then enter the Discovery Zone, an open-
ended child centred experience designed to inspire and excite. This area will include
a variety of STEM experiences, including role play areas, makerspaces, interactive
exhibits, block play, and digital learning opportunities. Learning content will be aligned
to the Scottish Curriculum for Excellence while introducing career pathways in the
context of Morays local economy. This may involve, for example, a space station,
Page 118

Page 119

Page 107 of 142 
where children could role play as an astronaut or engineer, designing and building a
rocket and launching on the air table. Children will explore this space freely, with
support and guidance from the STEM coordinator who will facilitate the session, and
from the Early Learning and Childcare (ELC) setting practitioners who will have
become familiar with the environment, following attendance at teacher taster sessions
and CPD training. 
During this half day visit, the child, along with their peers, will attend a short 45-minute
workshop focused on a particular area of STEM. Activities delivered in this session will
be simple and easy to recreate in the ELC setting. Activities will focus on inter
disciplinary learning, integrating literacy, numeracy, and careers education. 
Engagement with Early Years STEM does not end when a child returns to their ELC
setting. The STEM Coordinator will continue to engage with the class over the school
term, bringing a STEM resource kit aligned to a specific area of STEM, and a suite of
activities to be completed in the classroom under guidance from practitioners over the
course of the term. 
At home, the child will interact with family, highlighting the experiences and activities
and talking about STEM and the type of jobs available. Parents will then be
encouraged to attend a family STEM session at the centre and learn more about their
child’s STEM journey. Interested, the parent will access the digital portal for learning
content to try at home, and to find out about similar programmes offered at locations
across Moray. 
The child, now enthusiastic about STEM, will engage with the STEM centre on a
regular basis, at least once per school year until the end of Primary School. Activities
and experiences will be varied and age appropriate as they continue through Broad
General Education. 
Supplementary to the STEM centre experience, the child will engage with other STEM
programmes delivered through the STEM Learning Centre Network. At least once
every three years, the child as part of their school setting will have the opportunity to
visit the Environmental Sciences Education Centre at Milbuies, engaging with
programmes surrounding learning for sustainability and climate change. The child may
also attend this facility with family members, the centre being accessible to the wider
community. Enthused by environmental education, the child will continue their learning
at their school setting, with education staff trained on the subject matter following CPD
sessions offered by the organisation. 
The child will engage with industry through organised visits to industry locations,
including the Manufacturing and Innovation Centre for Moray, and the Digital Health
and Care Institution. Visits to other business locations and community organisations
will be possible, due to investment in education through the STEM Grant Scheme. 
As the child enters senior phase and is in pursuit of a STEM career pathway, they will
be encouraged to participate in the Young STEM leader Programme, delivering STEM
engagements to younger peers and the wider community. 
Page 119

Page 120

Page 108 of 142 
The student, equipped with the skills and aspirations to pursue STEM, will apply to
study at a local higher institution, ready to access the type of high-quality careers
available through Moray Growth Deal investment in the economy. 
Phase 1 Activity 
Phase 1 of the Early Years STEM Project will focus on development and delivery of
the initiatives core learning programme, as well as implementation of the mobile and
outreach offering, and development of the first of the STEM Centre Network hosted at
Elgin Public Library. 
STEM Officer Recruitment (2024-2025) 
In successfully implementing STEM learning and creating a STEM ecosystem in the
Moray area, it is critical to have the support of knowledgeable and enthusiastic staff,
committed to changing the perceptions of STEM. Following Full Business Case
approval, a STEM Engagement Manager will be recruited who will lead on curriculum
development and implementation of the initiatives outreach offering as detailed in the
next section. The STEM Engagement Manager will work collaboratively with partners
while engaging directly with schools, creating a dynamic and responsive curriculum
that meets the needs of Morays education system. Activities to enhance workforce
development will be initiated at this stage, the STEM Engagement Manager working
with existing STEM Champions within settings and seeking to expand this network
throughout project delivery. 
Prior to launch of the first STEM Centre location and mobile solution, two additional
STEM coordinators will be recruited and trained by the STEM Engagement Manager.
These posts will work across the Associated School Group (ASG) areas, facilitating
STEM engagements at the central facility and satellite sites, and providing outreach
activity at Early Learning and Childcare (ELC) and Primary settings. 
The “STEM office” will support workforce development, delivering CPD training to staff
across all ASGs and creating a network of STEM champions from ELC and school
settings throughout Moray. 
The Moray Council will fund revenue requirements, however given the budgeting
pressures in today’s climate; this will be a limited resource that can be delivered within
the existing revenue budget. Flexible working arrangements will be considered
including term time posts, and full time and part time working hours.   
Delivery options are being considered and include either recruitment of project staff
employed directly by the Moray Council, or outsourcing delivery through a Contract for
Services. Under either delivery option, contract management will sit with the Moray
Council. 
Page 120

Page 121

Page 109 of 142 
Educational Programme Development (2024-2025) 
Key to the successful of this project is the ability to build upon a comprehensive
learning programme aligned to the Scotland’s Curriculum for Excellence that offers
progression from early years through to broad general education.  Early Years STEM
will work collaboratively and iteratively with partners and education staff to develop
learning content that covers the core curricular areas of Science, Technology and
Numeracy while introducing career pathways in the context of Moray’s local economy.
The team will adopt an inter-disciplinary learning (IDL) approach that integrates
literacy, health & wellbeing, learning for sustainability and careers education.  Learning
materials will complement existing Moray educational practices, including Moray
science and technology progressions currently under development within Moray
Council Education. 
Learning content will include national programmes such as Energy Skills Partnerships
(ESP) First Lego League, Digital Health, and Care Innovations Centre’s (DHI) Digi-
inventors challenge, Raising Aspirations in Science (RAiSE)’s STEM through Stories,
as well as wide range of programmes offered through the Association of Science and
Discovery Centres. The Education Programme will offer both specialist content and
simple activities that can be easily repeated by education staff in schools and
nurseries.  
Early Years STEM Coordinators will develop the curricular materials with support from
partners and an exhibition and interpretation design consultant procured to design and
deliver the learning spaces. Information relating to the educational offering, STEM
learning centres, mobile solution and partner activity will be included within a digital
portal, also developed as part of phase 1 activity. 
Outreach Programme Development (2024-2025) 
Phase 1 will also see development and delivery of a central repository of STEM
resources, available for early learning and primary settings to borrow for classroom-
based STEM activity. This will be developed and delivered in collaboration with UHI
Moray and other partners, with each organisation hosting a suite of kits tailored to the
needs of the Moray region. 
Over the last six years, UHI has delivered a STEM outreach programme to primary
settings across the Highland Council area, providing materials and training to teachers
to build their confidence and knowledge in subjects they may not be familiar with. This
included the creation of ‘Lend a Lab’ boxes, which contain themed, age-specific
content and lesson plans to support teachers in delivering STEM topics in an engaging
way. UHI recently announced a £900,000 funding boost from the offshore wind
industry to further develop and sustain this successful initiative in the Highlands and
Islands area, with Moray receiving funding for a dedicated Part-Time STEM
Coordinator for 3 years and limited resource for equipment and materials. 
Page 121

Page 122

Page 110 of 142 
Early Years STEM has sought to collaborate with UHI Moray to further develop and
enhance this exciting and rewarding programme. The UHI STEM Coordinator and
Early Years STEM team will work collaboratively and iteratively to develop the
educational offering in a Moray context, with Growth Deal funding used to purchase
additional resources and materials that will extend the reach and quality of
engagement in our Moray schools. 
This work package has been developed in recognition that while one off experiences
and events have a part to play in delivering STEM and raising the aspirations of
children, they themselves are not sufficient to embed STEM learning as needs be the
case.  Lend-a-lab will deliver educational experiences and resources that will allow
schools and Early Learning and Childcare (ELC) settings to engage with STEM in the
classroom environment. It is designed to complement the Curriculum for Excellence
and give teachers the tools and training to deliver STEM confidently and flexibly,
recognising competing pressures and priorities within the sector. 
A case study outlining activities and resources delivered as part of UHI Lend a Lab is
included in Appendix 6, along with a list of potential resources and materials that may
be purchased and held as a central Moray STEM repository. 
Elgin STEM Centre (2024 – 2025)
As part of Phase 1 activity, the first STEM centre to be delivered will be hosted within
Morays Central Public Library at Elgin Cooper Park. Current proposals will see
renovation of the former drill hall into a Children’s STEM Discovery Zone and
Community Learning Hub, as well as redevelopment of key functional areas within the
building necessary to host the STEM space.  This will be the largest space within the
Network and will serve as a focal point for early years STEM education, delivering
innovative STEM learning experiences and coordinating STEM activity across the
region. 
The Community Learning Hub will offer a flexible scalable space with core learning
equipment suitable for delivery of STEM focused workshops.  The STEM Discovery
Zone will host a series of interactive exhibitions and experiences, a space where
children, educators and families can get hands on with equipment and explore STEM
subjects in an integrated and creative way. Case studies of similar environments
include The Science Oxford Centre,95 Café create within Dundee Science Centre96,
the STEM Discovery Centre in Stevenage97, and the Science Skills Academy Newton
Rooms98. 
The Moray Council Property team have been appointed to progress early-stage design
plans, with the final solution agreed in terms of building layout options. As the
development progresses through RIBA stage 3, options will be further explored 
95 The Science Oxford Centre, https://scienceoxford.com/resources/accessible-resources/virtual-tour/
96 Dundee Science Centre, https://www.dundeesciencecentre.org.uk/visit/cafe-create/
97 STEM Discovery Centre, https://stemdiscoverycentre.co.uk/
98 Science Skills Academy, https://www.scienceskillsacademy.co.uk/
Page 122

Page 123

Page 111 of 142 
relating to building fabric and M&E upgrades, as detailed in the RIBA 2 feasibility report
included in Appendix 8. 
A specialist exhibition and interpretation contractor has now been appointed to
progress interior design and fit out of the STEM learning space. Unusual Projects in
collaboration with Glasgow Science Centre, will work with the Moray Council Property
and Project Teams to design the space, the contract continuing through to fabrication
and installation subject to satisfactory performance and funding approval. Scope of
works include all exhibition, furniture, and storage solutions, visual design and
branding and supplementary learning materials, including a range of portable
materials that will be delivered as part of the mobile and outreach offering. 
Interpretation planning commenced in early 2024, the appointed contractor supporting
in stakeholder engagement activities and implementing a co-design process. A stage
2 cost plan is now complete and included in Appendix 9. 
Construction is anticipated to begin in January 2025, with preparatory works
scheduled in November 2024, including redeployment of excess book stock, removal
of storage racks, and re-deployment of library staff to a temporary working location
within the building. 
Mobile Solution Implementation (2025)
A distinct feature of this Early Years STEM initiative is to address rurality as a barrier
to participation. Early Years STEM draws inspiration from successful programmes
such as Glasgow Science Centres Powering the Future on Tour, Cambridge Science
Centre’s Pop-up Science, and the Science Skills Academy’s Pop-up Newton Room,
and will develop a mobile solution that parallels and extends the STEM Learning
Centre into all Associated School Groups (ASG)s in Moray. A range of mobile facilities
and equipment, including portable exhibits, will be developed that can be transported
to and used in any suitable venue including schools, community halls, and business
premises, throughout Moray. This will be achieved through the purchase of a medium
sized electrical vehicle that can be driven using a standard UK driving license. To
generate excitement and showcase the learning offer, the vehicle will have specialist
branding and fit out. 
Phase 2 Activity
Phase 2 will see expansion of the STEM Centre and Learning Networks, with satellite
sites developed in Forres and Buckie. Phase 2 will also see development of a unique
Environmental Sciences STEM Learning Centre. 
Environmental Sciences STEM Learning Centre (2026-2027)
This work package will see the creation of an Environmental Sciences STEM Learning
Centre, developed, and delivered in partnership with a Local Environmental Charity. 
Wild Things are uniquely positioned to run a STEM Hub of this nature, due to their
commitment as a charitable organisation to deliver environmental learning, experience
Page 123

Page 124

Page 112 of 142 
working within Moray’s education network, and ability to sustain their organisation
through access to ongoing external funding sources. The charity also delivers the
added advantage of owning a fleet of buses that can be used to transport children
from their settings to the centre. 
The proposal is to develop a vacant plot on Moray Council owned Common Good
Land at Milbuies Country Park into an Environmental Sciences STEM Learning
Centre. Moray Growth Deal funding will be used to develop the core infrastructure as
depicted in figure 16, including education and parking facilities, green energy
solutions, green infrastructure, and core learning equipment. The delivery mechanism
for this development is still being explored, however it is anticipated that the site will
be leased to and managed by Wild Things. 
Figure 16 Wild Things Education Centre at Milbuies
In line with the Moray Councils Climate Change Strategy and outcomes relating to
learning for sustainability, activities that will be undertaken on the land include leading
groups of early years, primary age, teenagers and adults in environmental exploration,
and conservation. The aim of expanding their knowledge of environmental and
biological sciences, furthering their appreciation for and care of the nature world, and
inspiring young people to consider the wide-ranging career opportunities in the
growing sector of environmental sciences.  
This innovative partnership with Wild Things will deliver against Early Years STEM
targets in relation to STEM engagements, whilst also delivering Wild Things own
environmental education activities in line with their charitable mission, which is to
create mutually beneficial relationships between individuals, communities, and the
natural world. The full scope of proposal is included in Appendix 11.
The preferred site at Milbuies is owned by the Elgin Common Good and acquisition of
the site for development must follow legal processes. According to the Community
Empowerment Act, where land is classified as Common Good, a public consultation
exercise is required where a disposal or change of land use is proposed. As the land
Page 124

Page 125

Page 113 of 142 
is also classified as inalienable, in addition to the public consultation, court authority
will also be required for a disposal. A long-term lease as proposed will fall within the
definition of a disposal. Advice from the Moray Council Estates and Legal Teams is
this process can be relatively straightforward if unopposed, however legal fees and
timeframes must be considered. 
Development of the site is planned for 2026, giving sufficient time to progress through
legal processes to acquire the site (Estates advise 3-4 months for court consent in
additional to public consultation and internal approvals.) Budget for legal fees has
been included in the financial case and pitched deliberately high to account for
increased financial risk. 
Forres STEM Centre (2027-2028)
Early Years STEM is in active discussion with The Leanchoil Trust to host a dedicated
STEM centre within the renovated Leanchoil Hospital in Forres99. The Trust is
embarking on an ambitious Project to transform a unique listed building and
surrounding landscape into a community focused Health and Wellbeing Centre. 
The centre will offer activities and services to support wellbeing, social engagement,
volunteering, employment, and learning, bringing enduring benefit to the people of
Forres and its rural communities. It is understood the Erskine Veterans Retirement
Centre will also be located within the building, creating significant opportunity for
community STEM participation and inter-generational learning. 
The vision for this STEM space is aligned to the Elgin Facility, with the creation of an
early year’s interactive learning space and community learning hub. This will be a
shared resource, with the Moray Council STEM Team delivering programmes to the
target audience, and the Trust accessing facilities for the benefit of the wider Forres
Community. This facility will have a strong emphasis on health and wellbeing, outdoor
education, and digital technology, due to nature of the facility, location within a
woodland setting and opportunity to link with the Digital Health and Care Innovation
Project. The possibility of incorporating an immersive sensory zone will also be
explored, as this will provide high quality learning experiences for early year’s children
and those with Additional Support Needs (ASN). 
Development of this centre is aligned with renovation plans for the Leanchoil Trust;
with curriculum delivery anticipated in late 2027.  
Delivery arrangements for this development are still being explored however it is
anticipated that MGD funding will be used to develop allocated space within the
building and the space leased to Moray Council under a long-term leasing
arrangement at nominal rates. 
99 The Leanchoil Trust https://www.leanchoiltrust.org/the-plans/
Page 125

Page 126

Page 114 of 142 
Buckie STEM Centre (2028-2029)
Planning for the Buckie facility is still under development however a preferred location
has been identified. The Community Hall above Buckie Library is a vacant council
owned facility, and proposals will see this space transformed into an active learning
environment that is aligned with the vision for the Forres and Elgin facilities.
Development of the Buckie facility is anticipated to begin in 2028, therefore site options
will continue to be identified and reviewed throughout the project. For this FBC, cost
estimates and benefits appraisals will be progressed on the assumption of Buckie
Community Town Hall as the preferred site. 
Phase 3 Activity
Phase 3 will focus on the expansion of the STEM Learning Network to businesses,
community groups and partners Moray wide, as well as ongoing purchase of STEM
materials and resources across the STEM centre infrastructure. 
Ongoing Equipment Purchase 
There will be a requirement to update and refresh equipment periodically, to ensure
experiences remain inspiring and relevant to audiences. Budget will therefore be
allocated to update equipment throughout the latter project phase. 
STEM Grant Scheme
Early Years STEM seeks to create a STEM Ecosystem in the Moray area, through the
creation of a STEM Network involving employers, higher education institutions, partner
providers, museums, and community volunteers. 
A portion of Moray Growth Deal funding will be ring fenced to support specific activity
relating to these partnerships. This will be in the form of an annual budget allowance
that can delivered in the form of capital grants and provision of specialist equipment
to support a diverse range of projects and initiatives throughout Moray. 
Working with partners such as Developing the Young Workforce, Moray College UHI
and the private sector, employers will be engaged to host STEM activities and events
at industry sites to allow young people to see for themselves STEM activity being
brought to life, generate excitement, and interest in STEM and embed knowledge of
the opportunities that are possible in Moray. 
Funding will also support partnership activity with other Moray Growth Deal Projects,
such as MAATIC, MICM, DHI and Cultural Quarter, through the purchase of facilities
and learning equipment and delivery of specific events. 
Community organisations and groups will have the opportunity to apply for funding to
support a wide variety of STEM related projects and initiatives, such as makerspaces,
Lego clubs, after school STEM clubs. Schools can apply for funding to purchase STEM
materials that will enable delivery of STEM clubs and facilitate parental engagement. 
An outline criteria for the STEM Grant Scheme is included in Appendix 13.
Page 126

Page 127

Page 115 of 142 
Phase 1 Procurement Activity
All procurement to date has been carried out in line with the overall procurement
strategy and in line with Moray Councils procurement regulations. 
A summary of anticipated Phase 1 procurement activity is as follows: 
• The Moray Council Property Team have been appointed to provide architectural
and design services and will project manage the development at Elgin Library
throughout construction. The Moray Councils internal design team includes
architects, structural engineers, and quantity surveyors. External support will be
sought as required and appointed through approved Moray Council
Frameworks
• A construction contractor will be appointed at RIBA stage 4 and appointed either
through competitive tender or approved Moray Council Frameworks. This will
be dependent on market conditions and availability of suppliers. 
• A specialist exhibition and interpretation contractor has now been appointed to
progress interior design and fit out of the STEM learning space. Unusual
Projects in collaboration with Glasgow Science Centre, will work with the Moray
Council Property and Project Teams to design the space, the contract
continuing through to fabrication and installation subject to satisfactory
performance and funding approval. Scope of works include all exhibition,
furniture, and storage solutions, visual design and branding and supplementary
learning materials, including a range of portable materials that will be delivered
as part of the mobile and outreach offering. 
• Purchase of a medium sized electric van will be achieved via Moray Council
procurement frameworks. A suitable vehicle has been identified and purchasing
will commence following early interpretation planning, ensuring the vehicle is fit
for purpose to transport specialist STEM equipment.   
• Purchase of IT equipment, STEM resources and furniture items not covered
under the exhibition contract will be through approved Moray Council
Frameworks.
• Any additional consultancy works not specified above (performance and
evaluation, brand development, legal support etc) will be procured with
adherence to Moray Council Procurement Processes. 
Phase 2-3 Procurement Activity 
A summary of anticipated Phase 2 and 3 procurement activity is as follows: 
• Legal consultants will be engaged following FBC approval to support activity
relating to Phase 2 and 3 developments. Support relating to subsidy
compliance, development of partnership agreements and site acquisition
considerations will be sought. 
Page 127

Page 128

Page 116 of 142 
• A feasibility study assessing the viability of Milbuies will be commissioned
following FBC approval. This work will likely include early conceptual design
work to support public consultation. 
• Following public consultation and land acquisition, a landscape architect will be
appointed to support planning for the Milbuies development. Appointment will
be made through competitive tender and as per Moray Council processes. 
• Procurement activity for Forres and Buckie locations is yet to be determined. 
Subsidy Control
Following guidance as set out in the Subsidy Control Act 2022, it was determined that
none of the investments proposed as part of Phase 1 activity constitutes a subsidy, as
there would be no transfer of funds or economic advantage to any party out with the
Moray Council. 
Phase 2 and 3 activities will require a detailed assessment and guidance from external
legal advisors, as some activity may have implications relating to subsidy control.
Guidance will be sought as planning for these phases develops and included in an
annex submission. 
Potential for Risk Transfer
The general principle is that risks should be passed to ‘the party best able to manage
them’, subject to value for money. This section provides an assessment of how the
associated risks might be apportioned. 
Risk Category
Potential allocation
Public Private Shared
1. Design risk ✓ ✓ 
2. Construction and development risk   ✓ 
3. Transition and implementation risk   ✓ 
4. Availability and performance risk   ✓ 
5. Operating risk ✓   
6. Variability of revenue risks ✓   
7. Termination risks ✓   
8. Technology and obsolescence risks    ✓ 
9. Control risks ✓   
10. Residual value risks ✓   
11. Financing risks ✓   
12. Legislative risks ✓   
13. Other project risks ✓   
Page 128

Page 129

Page 117 of 142 
Proposed Charging Mechanisms 
• Payment for all design, construction and development contracts will be made
by the Moray Council according to a pre-agreed payment schedule.  
• Financial contributions granted by the Early Years STEM Project to external
parties will be controlled by legal agreements and grant funding agreements
setting out the terms and conditions of the funding. 
• Operational costs associated with Moray Council facilities hosted at partner
locations will be covered under a leasing agreement and paid by the Moray
Council to the organisation on a pre-agreed payment schedule. 
• Should service delivery be achieved through an outsourced Contract for
Services, payment to the service contractor would be made according to a pre-
agreed schedule as negotiated with the successful tenderer. 
Proposed Contract Lengths
It is anticipated that contracts for the required capital works and services is as follows: 
• The Moray Council Property Team are progressing detailed design and
planning services for phase 1 activity and will support project management of
capital works through to delivery. Design contracts are anticipated to span 12-
24 months. 
• Design contracts for subsequent developments will be progressed by the Moray
Council or through competitive tender. 9–24-month design contracts and 12–
36-month design and build contracts will be considered. 
• Specialist exhibition contractors will be appointed to undertake internal fit out of
spaces under a design and build contract. 12–24-month contracts will be
considered. 
• Where renovation of partner sites is required for phase 2 activity, development
agreements will be put in place. 
• Partnership activity will be managed through Memorandums of Understanding
and Legal Agreements
• Should service delivery be achieved through an outsourced Contract for
Services, contract length will be for an initial term of 3-5 years, with option to
extend. 
Proposed Key Contractual Clauses
These are as follows: 
• the duration of the contract and any break clauses.
• the service provider’s and procuring authority’s respective roles and
responsibilities.
• the payment – or charging – mechanism, including prices, tariffs, incentive
payments.
• detailed community benefit commitments
• change control (for new requirements and updated services)
• the organisation’s remedies in the event of failure on the part of the service
provider to deliver the contracted services – on time, to specification and price.
Page 129

Page 130

Page 118 of 142 
• the treatment of intellectual property rights.
• compliance with appropriate regulations.
• the operational and contract administration elements of the terms and
conditions of service.
• arrangements for the resolution of disputes and disagreements between the
parties.
• the agreed allocation of risk. 
All contracts to take cognisance of the requirements of the Equality Act 2010 (Specific
Duties) (Scotland) Regulations 2012 with specific equality outcomes regarding the
gender pay gap / equal pay / occupational segregation. 
All construction work to follow the Carbon Trust Buildings Fabric Guide to ensure that
facilities contribute to Net Zero Carbon Emissions 2050 target. 
A review of each contract should be carried out post award – normally this would be
around six months from contract start date.   This review will consider: 
• Relationship with supplier
• Order process
• Payment process
• Standard of initial contract delivery 
Personnel Implications 
It is anticipated that the TUPE – Transfer of Undertakings (Protection of
Employment) Regulations 1981 – will not apply to this investment as outlined above. 
Page 130

Page 131

Page 119 of 142 
5. The Financial Case 
Impact on the organisations income and expenditure acount
The Early Years STEM project has a funding requirement of £6.4 million over 10
financial years and includes £4.8 million of capital funding and £1.6 million of revenue
funding. Funding will be provided by the Moray Council and Scottish Government, the
Moray Council meeting all revenue costs and £1.3 million of capital costs, and the
Scottish Government providing £3.5 million of capital funding. 
Capital expenditure includes acquisition, renovation, and fit out of sites, as well as all
professional fees associated with the developments. An allowance has also been
made for the purchase and fit out of a vehicle, as well as supplementary learning
resources for delivery of the projects core learning programme.  Materials will be
purchased over the life of the project to allow delivery of a dynamic and responsive
curriculum and will be selected in consultation with stakeholders. Equipment will be
rotated across STEM centres and ASGs to reduce waste and maximise usage. Any
equipment due to be replaced will be recycled or donated to schools / community
groups.  A list of possible materials is included in Appendix 6 to demonstrate the nature
of spend. 
A portion of capital budget has been ring fenced to support partnership activity.
Financial contributions will be made from the Moray Council to community and private
organisations to enable delivery of STEM programmes across Moray. Contributions
will be controlled by grant funding agreements setting out the terms and conditions of
the funding. 
Pricing in the capital case is expressed in nominal terms. 
Revenue expenditure includes all staffing and operational costs associated with
programme delivery, as well as rental and utilities costs for the Moray Council led sites
at Elgin, Buckie and Forres, and operational costs for the mobile solution. As each site
will be hosted within a Moray Council service or partner organisation, rental costs are
minimal and include a nominal annual contribution to operational costs.   
A 3% inflation rate has been applied to all revenue costs. 
The proposed outdoor development at Milbuies will be leased and managed by Wild
Things and controlled through a service agreement. The partner organisation will be
responsible for all staffing and operational costs associated with the site. 
The anticipated financial profile for the project over the MGD funding period is set out
below.     
Costs are exlusive of VAT.
Page 131

Page 132

Page 120 of 142 
£ 23/24 24/25 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total
Capital Spend (Scottish Govt and Moray Council)
Professional Fees
Economic and Social Impact Assessment £10,855 £11,404 £20,000 £42,259
Performance Monitoring & Evaluation £20,000 £20,000 £40,000
Legal Fees £10,000 £10,000 £10,000 £30,000
£10,855 £11,404 £10,000 £30,000 £10,000 £20,000 £0 £0 £0 £20,000 £0 £112,259
Phase 1 Elgin Discovery Centre & Coordinating Hub
Development Fees £35,638 £35,853 £40,022 £20,581 £132,094
Construction Costs (Base Building) £596,750 £448,897 £1,045,647
Exhibition Design & Interpretation £20,000 £56,250 £76,250
Exhibition & Interior Fit Out Costs £181,751 £241,999 £423,750
Supplementary Equipment Costs £60,000 £60,000
Total £55,638 £92,103 £818,523 £771,477 £0 £0 £0 £0 £0 £0 £0 £0 £1,737,741
Phase 1 Mobile Solution & Outreach
Vehicle Purchase & Wrapping £75,000 £75,000
Mobile Equipment £40,000 £40,000
STEM Resource Bank Equipment Purchase £20,000 £50,000 £65,000 £135,000
£0 £20,000 £50,000 £180,000 £0 £0 £0 £0 £0 £0 £0 £0 £250,000
Phase 2 Outdoor
Development Fees £10,000 £20,000 £20,000 £20,000 £70,000
Capital Costs £630,000 £630,000
£0 £10,000 £20,000 £20,000 £650,000 £0 £0 £0 £0 £0 £0 £0 £700,000
Phase 2 Forres
Development Fees £50,000 £50,000
Renovation Costs £200,000 £250,000 £450,000
Fit Out & Equipment Costs £200,000 £200,000
£0 £0 £0 £250,000 £450,000 £0 £0 £0 £0 £0 £0 £700,000
Phase 2 Buckie
Development Fees £50,000 £50,000
Renovation Costs £100,000 £350,000 £450,000
Fit Out & Equipment Costs £200,000 £200,000
£0 £0 £0 £0 £150,000 £550,000 £0 £0 £0 £0 £0 £700,000
Phase 3 - Network Expansion
Ongoing Equipment Costs £100,000 £100,000 £100,000 £300,000
STEM Grant Scheme £100,000 £100,000 £100,000 £300,000
£0 £0 £0 £0 £0 £0 £200,000 £200,000 £200,000 £0 £0 £600,000
Total Capital Cost £66,493 £133,507 £898,523 £1,001,477 £910,000 £620,000 £550,000 £200,000 £200,000 £220,000 £0 £0 £4,800,000
Capital Funding
Scottish Government £693,585 £752,315 £692,510 £471,820 £418,550 £152,000 £152,000 £167,220 £0 £0 £3,500,000
Moray Council £66,493 £133,507 £204,938 £249,162 £217,490 £148,180 £131,450 £48,000 £48,000 £52,780 £0 £0 £1,300,000
Total £66,493 £133,507 £898,523 £1,001,477 £910,000 £620,000 £550,000 £200,000 £200,000 £220,000 £0 £0 £4,800,000
Phase 2 Phase 3FBC Phase 1
Spend at Risk
Page 132

Page 133

Page 121 of 142 
Figure 17 Early Years STEM Financial Profile
£ 22/23 23/24 24/25 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 Total
Revenue Spend
EY STEM Core Programme
Project Manager £53,595 £71,338 £12,922 £137,855
STEM Programme Development £18,354 £18,354
STEM Engagement Manager (0.7 FTE) £11,448 £47,165 £48,580 £50,037 £51,538 £53,085 £54,677 £56,317 £58,007 £59,747 £490,602
STEM Engagement Officer (1.4 FTE) £56,094 £57,776 £59,509 £61,295 £63,133 £65,027 £66,978 £68,988 £71,057 £569,858
Branding & Marketing £7,000 £7,000
Insurances £2,000 £2,060 £2,122 £2,185 £2,251 £2,319 £2,388 £2,460 £2,534 £2,610 £22,928
Mobile Solution Running Costs £5,150 £5,305 £5,464 £5,628 £5,796 £5,970 £6,149 £6,334 £6,524 £52,319
Total £53,595 £71,338 £12,922 £38,802 £110,469 £113,782 £117,196 £120,712 £124,333 £128,063 £131,905 £135,862 £139,938 £1,298,916
Elgin Centre
Rental & Utilties £9,270 £9,548 £9,835 £10,130 £10,433 £10,746 £11,069 £11,401 £11,743 £94,175
Consumables £5,000 £5,150 £5,305 £5,464 £5,628 £5,796 £5,970 £6,149 £6,334 £6,524 £57,319
Total £0 £0 £0 £5,000 £14,420 £14,853 £15,298 £15,757 £16,230 £16,717 £17,218 £17,735 £18,267 £151,494
Forres Centre
Rental & Utilties £4,917 £5,065 £5,216 £5,373 £5,534 £5,700 £5,871 £37,676
Consumables £5,464 £5,628 £5,797 £5,971 £6,150 £6,334 £6,524 £41,868
Total £0 £0 £0 £0 £0 £0 £10,381 £10,692 £11,013 £11,344 £11,684 £12,034 £12,395 £79,544
Buckie Centre
Rental & Utilties £5,065 £5,217 £5,373 £5,535 £5,701 £5,872 £32,762
Consumables £5,628 £5,797 £5,971 £6,150 £6,334 £6,524 £36,404
Total £0 £0 £0 £0 £0 £0 £0 £10,693 £11,014 £11,344 £11,685 £12,035 £12,396 £69,167
Total Revenue Costs £53,595 £71,338 £12,922 £43,802 £124,889 £128,635 £142,875 £157,854 £162,590 £167,467 £172,491 £177,666 £182,996 £1,599,121
Revenue Funding
Moray Council £53,595 £71,338 £12,922 £43,802 £124,889 £128,635 £142,875 £157,854 £162,590 £167,467 £172,491 £177,666 £182,996 £1,599,121
Total £53,595 £71,338 £12,922 £43,802 £124,889 £128,635 £142,875 £157,854 £162,590 £167,467 £172,491 £177,666 £182,996 £1,599,121
FBC
Spend at Risk
Page 133

Page 134

Page 122 of 142 
Assumptions
Phase 1
Elgin STEM Centre 
The detailed design (to RIBA stage 4) of the first STEM centre location is being
undertaken from Q4 2023/24 to Q2 2024/25. Proposals have been developed to RIBA
Stage 2 for the base building design and included in Appendix 8 in the RIBA Stage 2
feasibility report and cost plan.  Included in the report are a range of options relating
to building fabric upgrades including M&E, structural and heating system upgrades.
These will be further explored as planning progresses through RIBA 3. Renovation
costs and associated property design fees for option 1B have been included in the
financial profile however alternative options will be explored should costs exceed
allocated budget. A project contingency of 15% has been included as Elgin Library is
a known Moray Council building undergoing light renovation and considered a low-risk
development. 
Fit out of the STEM centre including exhibition, furniture, audiovisual and associated
learning equipment will be progressed by an exhibition and interpretation contractor.
The conceptual manual is included in appendix 10 as well as design fees and
indicative costs provided at tender stage.   
A contribution of £30/sqm per annum has been agreed between the project team and
the libraries service manager to cover rental and utilities. An allowance for
consumables has also been included. A 3% inflation rate has been applied to all
revenue costs. 
Mobile Solution & Outreach 
The financial profile includes an allowance to purchase a medium sized electric van
and fit out with specialist branding and storage. Cost estimates have been provided
by Moray Council fleet services and vehicle purchase will be through Moray Council
procurement frameworks. 
An allowance has also been included to purchase mobile furniture and ICT equipment,
and to develop a suite of learning materials themed around the Scottish Curriculum
for Excellence as part of the projects outreach model. Equipment will be selected in
consultation with stakeholders throughout project delivery to ensure a dynamic and
responsive curriculum. An equipment list of potential resources is included in Appendix
6. Resources will be purchased through Moray Council procurement frameworks.   
Phase 2 
Outdoor Environmental Education Centre 
Planning for the phase 2 outdoor facility is still under development, with a preferred
site taken forward for appraisal. Development costs have been assumed to be in the
region of £700k for the core infrastructure including, parking, structures, and land
development costs. The proposal is for the site to be leased to Wild Things at
peppercorn rates and managed through a service agreement. Wild Things will cover
all operational costs including staffing and utilities. Wild Things as a charitable
Page 134

Page 135

Page 123 of 142 
organisation will seek to leverage match funding through external funding sources to
cover any funding gaps. 
Should Wild Things fail to secure the necessary match funding, alternative suppliers
will be sought to lease the site and deliver benefits. This will be managed through the
change control process and any impact on benefits quantified and communicated to
governments. 
Forres STEM Centre 
Planning for the phase 2 Forres facility is still under development, with a preferred site
taken forward for appraisal at Leanchoil.  The Moray Council will fund renovation costs
through direct contribution to the Leanchoil Trust. The Leanchoil Trust design team
estimates £450,000 of renovation costs based on a rate of £3000/sqm for 150sqm of
allocated space within the building. Equipment and fit costs of £200,000 have also
been assumed. 
The Leanchoil Trust will cover all building management fees, cleaning, and utilities
costs, with the Moray Council providing a nominal contribution to these costs of
£30/sqm per annum under a rental agreement. A 3% inflation rate has been applied
to all revenue costs. 
Buckie STEM Centre 
Planning for the phase 2 Buckie facility is still under development, with a preferred site
taken forward for appraisal at Buckie Library. £450,000 renovation costs have been
assumed based on a rate of £3000/sqm for 150 sqm of allocated space within the
building. Equipment and fit costs of £200,000 have also been assumed. 
A contribution of £30/sqm per annum has been agreed between the project team and
the libraries service manager to cover rental and utilities. An allowance for
consumables has also been included. A 3% inflation allowance has been applied to
all revenue costs. 
Professional Fees 
Professional fees include an allowance for legal work and consultancy support
including an economic impact assessment at FBC stage and Phase 2 annexe
submission, and an interim and post project evaluation. 
Phase 3 
STEM Grant Scheme 
Financial contributions will be made from the Moray Council to external parties under
grant funding conditions and partnership agreements. 
Staffing Costs 
Staffing costs are for a 0.7 FTE STEM Engagement Manager post at grade 11 and 1.4
FTE STEM Coordinator posts at grade 7. Staff grades are estimated based on the
Page 135

Page 136

Page 124 of 142 
Highland Council grading scales for the Science Skills Academy STEM Programme
and have been pitched deliberately high. A wage inflation of 3% has been applied
based on 2024/25 figures. 
Overall Affordability 
The financial profile presented in this business case demonstrates the project can be
sustained within allocated budget over the 10-year funding period. The profile does
not include private and commercial sector support for which there is has been
significant interest. This includes commercial hire of spaces, sponsorship of events,
income from events, and in-kind contributions from employers.  Income generated
from this activity will support operational elements and will be pursued where possible
once the project moves into operation.   
The ongoing financial sustainability of the project after the MGD funding period will be
evaluated throughout delivery and at project closure. It is anticipated that external
income streams will support project delivery however the Moray Council as lead
delivery partner will be responsible for any shortfalls in funding. Staffing structures will
also be reviewed at the end of the funding period, as delivery partners and members
of the STEM learning network take a more active involvement in project delivery. 
Page 136

Page 137

Page 125 of 142 
6. The Management Case 
Programme Management Arrangements
The project is an integral part of the Moray Growth Deal programme which comprimises a portfolio of projects for delivery of economic
growth to the Moray region. 
The programme governance arrangements are as follows: 
Figure 18 Moray Growth Deal Governance Structure
Page 137

Page 138

Page 126 of 142 
Project management Arrangements
Project Reporting Structure 
The Early Years STEM Project Board has been formed to oversee project governance
arrangements and is made up of key representatives from the Moray Council and
partner organisations.  The Early Years STEM Project Board will ultimately oversee
the project and the approval of key stages of development.   
The project will be managed in accordance with PRINCE 2 methodology. The project
board usually meets bi-monthly to oversee project activity. Meetings were more
frequent in the time leading up to the preparation of the FBC. Management of risks,
issues and change management will be in line with Moray Council Governance policy. 
Additional steering groups will be formed to progress planning for the individual
workstreams. 
Page 138

Page 139

Page 127 of 142 
The reporting organisation and the reporting structure for the project is as follows. 
Figure 19 Project Reporting Structure
Page 139

Page 140

Page 128 of 142 
Operational Structure
The project will be delivered by a multi-agency collaboration that includes the Moray
Council, partner providers, and volunteers from industry and the wider community. 
A team of STEM coordinators will be employed to oversee programme delivery,
including delivery of engagements at the Moray Council led sites and management of
the STEM learning network. Delivery options are being considered and include either
recruitment of project staff employed directly by the Moray Council, or outsourcing
delivery through a Contract for Services. Under either delivery option, contract
management will sit with the Moray Council. 
Activity will be supported by key delivery partners including the Leanchoil Trust, UHI
Moray, Moray Council Libraries & Learning Centre Team and other representatives
from the STEM Strategy Group. 
Wild Things will have direct responsibility for management and delivery of the Outdoor
Environmental Education Centre. 
Page 140

Page 141

Page 129 of 142 
The operational structure is as follows: 
Figure 20 Operational Structure
Page 141

Page 142

Page 130 of 142 
Roles and Responsibilities 
Name Role  Responsibilities
Project Delivery Team
Hazel Sly Early Years Service
Manager & Project SRO 
Responsible for delivery of the
Early Years STEM project;
responsible for ensuring project
satisfies requirements of MGD. 
Sarah Barnes Early Years STEM Project
Manager 
Project management lead
responsible for overseeing
project management function,
FBC development, and
implementation of all project
workstreams. 
New Post  STEM Learning and
Engagement Manager 
Responsible for service delivery
to primary users, curriculum
development, coordination of
events, stakeholder
management, management of
STEM Coordinators. 
New Post  STEM Coordinator  Facilitation of 
STEM engagements across all
Moray Council sites and
programmes. 
New Post  STEM Coordinator Facilitation of STEM
engagements across all Moray
Council sites and programmes. 
Page 142

Page 143

Page 131 of 142 
Other Stakeholders involves in development and delivery of the project are as follows: 
Team Role  Responsibilities
Early Years STEM
Project Board 
Moray Council 
University of Highlands and
Islands
UHI Moray
Education Scotland
SSERC
Developing the Young
Workforce
Skills Development Scotland
National Health Service
Aberdeen Science Centre
Gordon and MacPhail 
Boeing
Provide overall strategic
direction, governance, and
approval of key stages of
project development. 
Multi-Disciplinary
Design Team 
Design and Construction
Manager 
Principal Architect
Quantity Surveyor
Structural Engineer
Mechanical Engineer
Electrical Engineer
CDM Advisers
Exhibition Project Manager 
Responsible for capital
development of sites.
Design, construction,
handover, and project
management support. 
Implementation
Groups
Early Years Service
Manager
Early Years STEM Project
Manager
Property Asset Manager
ICT Infrastructure Manager
Senior Accountant
Procurement Officer
Sport and Culture Service
Manager
Wild Things 
Leanchoil Trust 
Representatives from key
services and organisations
involved in the overall
strategy, development, and
implementation of each
individual workstream.
Engagement Group  Representatives from key
user groups including
education staff, young
people, wider community. 
Ongoing consultation with
users. 
Page 143

Page 144

Page 132 of 142 
Project Plan Summary 
(Full Plan in Appendix 3) 
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
OBC
Project Review
Site Identification
FBC
Phase 1 (Outreach Implementation)
Phase 1 (Outreach Delivery)
Phase 1 (Mobile Implementation)
Phase 1 (Mobile Delivery)
Phase 1 (Elgin Implementation)
Phase 1 (Elgin Delivery)
Phase 2 (Outdoor Implementation)
Phase 2 (Outdoor Delivery)
Phase 2 (Forres Implementation)
Phase 2 (Forres Delivery)
Phase 2 (Buckie Implementation)
Phase 2 (Buckie Delivery)
Phase 3 (Network Expansion)
Performance and Evaluation
FBC Approval
2033/
34
27/2822/23 23/24 24/25 25/26 26/27 28/29 29/30 2030/
31
2031/
32
2032/
33
Page 144

Page 145

Page 133 of 142 
Use of Specialist Advisors
Special advisers have been used in a timely and cost-effective manner in accordance with the
Treasury Guidance. 
Specialist Area Adviser
Subject Matter Experts ▪ Lorraine Paisey, Chief Financial Officer, Moray
Council
▪ Diane Beattie (until Jan 2024), Janis Hepburn (Jan
2024 onwards) Payments Manager, Moray Council 
▪ Don Toonen, Equal Opportunities Officer, Moray
Council 
▪ Aileen Scott, Legal Services Manager, Moray
Council 
▪ Moray Macleod, Design and Construction Manager,
Moray Council 
▪ Ross Mawhinney, Economic Consultant, Ekosgen
▪ Ian Menzies, Education Scotland
▪ Aileen Hamilton, SSERC
Suppliers ▪ Kim Slater, Sports and Culture Manager, Moray
Council 
▪ Neil Strachan, Property Asset Manager, Moray
Council 
Users ▪ Hazel Sly, Early Years Service Manager, Moray
Council 
▪ Samantha Bright, Head of STEM Curriculum UHI
Moray
▪ Jolene Young, School Coordinator, DYW Moray
▪ Kristen Keedwell, Depute Head Teacher, Moray
Council 
▪ Abby Martin, Early Years Teacher, Moray Council 
Page 145

Page 146

Page 134 of 142 
Outline arrangements for risks issues and change management.
The strategy, framework, and plan for dealing with change and associated contract
management is contained in the Council`s Project Governance Policy: 
http://smi.moray.gov.uk/MPG/01%20Governance%20and%20Templates/PMO%20Guide%2
0to%20Project%20Risk,%20Issue,%20Change%20and%20Lessons%20Learned.docx 
If specific sites or delivery partners identified within Phase 2 activity change, the
change control process will take account of impact on project outputs, outcomes and
benefit realisation. 
Outline arrangements risk management.
The strategy, framework, and plan for dealing with the management of risk is detailed
at 6.4 above. 
The project risk register is attached at Appendix 5. 
Outline arrangements for Benefits Realisation 
The strategy, framework, and plan for dealing with the management and delivery of
benefits is detailed here: 
http://smi.moray.gov.uk/MPG/01%20Governance%20and%20Templates/Benefits%20Manag
ement%20Guidance.docx 
A framework for the Moray Growth Deal`s (MGD) Benefits Realisation and Monitoring
Plan has been developed. This framework looks at how different targets from across
all MGD projects will combine to achieve specific programme level outcomes and is
structured by inclusive growth indicators. The MGD Governance Board will focus on
programme level benefits bi-annually, May and November. 
A programme benefits realisation and monitoring plan is maintained and can be
accessed here: 
Programme Benefits Realisation Plan 
Monitoring and Evaluation Arrangements 
The project will measure performance against the six investment objectives as follows:   
Investment Objective 1 – To increase the availability of STEM opportunities for
younger people, through the creation of experiential STEM learning hubs delivering
upwards of 9000 engagements per annum by 2032.  
• The project aims to deliver 5 experiential STEM learning hubs (4 fixed: 1
mobile). The project team will track completion and report accordingly in the
benefits monitoring plan. 
Page 146

Page 147

Page 135 of 142 
• Each facility will track the number of students attending any given year.
Qualitative data will be obtained through learner feedback forms and annual
surveys. 
Investment Objective 2 - To increase participation and attainment in STEM
subjects at secondary level by 8%, thereby encouraging uptake at further and
higher education and ultimately increasing the STEM skills level in Moray by 2042.
• Attainment data is published annually by the Scottish Qualifications
Authority and reported in the Moray Councils Public Performance Report.
Education officers will record data annually to monitor trends. 
• KPIs include:
o Short term: 5% increase in Achievement of a Level (ACEL) in
numeracy at P1, P4, P7 combined.
o Long term: 8% increase in students attaining A-C level qualifications
in STEM Subjects. 
Investment Objective 3 - To ensure there is equality of opportunity in STEM
education across Moray, ensuring all students aged 3-8 are engaged with the
curriculum at least once per annum no matter their location, and increasing
female participation in STEM subjects at secondary level by 10% by 2042. 
• The number of females choosing STEM subjects at National 5 and
Higher Level will be monitored and recorded annually. Benefit beings to
be realised in year 2034. Education officers will monitor data and report
to SG. 
• In 2023 there was 5800 students enrolled in Moray schools in the target
age group (age 3-8). STEM coordinators will track engagements and
ensure each class in target age group is engaged once per annum. 
Investment Objective 4 – To increase the skills level of early year’s
practitioners and primary teachers in the delivery of STEM disciplines, with an
increase of 32 STEM champions in settings by 2032. 
• There are currently 14 ELC STEM Champions and 14 Primary STEM
Champions in Moray. Settings will be engaged to nominate a STEM
Champion to participate in training sessions covering the core areas of
the STEM curriculum. 
• A minimum of 10 training session to be offered per annum and
participation will be tracked by STEM coordinators. 
Investment Objective 5 – To strengthen science capital within communities
through the provision of 10 public engagement events per annum, thereby
encouraging parental engagement, inter-generational learning, and raising the
awareness of STEM related careers by 2032. 
• STEM Coordinators will market and deliver at least 10 public
engagement session per annum. Number of engagements will be
tracked and qualitative surveys used to track performance and impact. 
Investment Objective 6 – To develop new forms of delivery through multi-
agency collaboration and inter-disciplinary working, engaging 400 students
Page 147

Page 148

Page 136 of 142 
aged 3-12 in partner led programmes and events, and increasing the number
of industry and community STEM Ambassadors in Moray by 50% by 2032.
• The STEM Moray Steering Group will meet once per term to plan events,
ensuring older age groups are engaged. Employer, partner and student
participation to be tracked and reported annually. 
• SSERC oversee the STEM Ambassador network in Moray and
participate in the STEM Moray Steering Group and STEM Project Board.
EY STEM and partners will engage employers and community
champions to sign up to the portal. Number of engagements will be
tracked and reported by SSERC. 
Benefits will be monitored throughout the life of the project and tracked as per the
benefits monitoring plan in Figure 
Short term benefits will be tracked annually and reported in an interim evaluation report
in year 2028 and in a post project report in 2032. Long term benefits (only realised
after project closes) will be tracked by Education Officers.   
An interim and final project evaluation will be commissioned using external
consultancy support. 
Page 148

Page 149

Page 137 of 142 
ID Inclusive
Growth
Indicator the
benefit
relates to
Project
the
benefit
relates
to
Benefit to be
realised
Baseline (2023) Project End State
Target
Measurement Benefit
owner
Responsible
officer
Data Set Reporting periods Project Timing
Prod.BR.1 Productivity EY
STEM
Increased
alignment of
workforce skills
with business
requirements
Qualitative
measure
Qualitative
measure
Feedback from
local employers
through DYW
and SDS channels
Reported at Year
10, 15, 20
31/03/2044 Hazel
Sly
Education
Officer
Prod.BR.2 Productivity EY
STEM
Increased inward
investment to
Moray. 
No target
assigned 
No target
assigned 
Quantify
financial and in-
kind support
from businesses
and funders 
Annually  31/03/2044 Hazel
Sly
Education
Officer
Prod.BR.3 Productivity EY
STEM
Increased GVA 0 £1.5 million Actual GVA
added calculated
by reference
figures included
in Full Business
Case. 
GVA calculated at
year 10, 15, 20. 
31/03/2044 Hazel
Sly
Economic
Analyst
Prod.BR.5 Productivity EY
STEM
Increased
networking and
connections
between
businesses,
communities and
the education
sector
0 10 multi-agency
STEM events held
annually
STEM Moray
Steering Group
to oversee
collaborative and
track
engagements 
Annually  31/03/2032 Hazel
Sly
Education
Officer
Peop.BR.1 People EY
STEM
Increase in
numeracy
attainment in early
years and primary
75% at P1, P4,
P7 combined
80% P1, P4, P7
combined
Data published
annually in public
performance
report
Annually  31/03/2032 Hazel
Sly
Education
Officer
Peop.BR.2 People EY
STEM
Increase in
attainment of
STEM subjects at
national 5 and
higher
1645
Qualifications
A-C Level in
STEM Subjects
1777
Qualifications A-C
level in STEM
Subjects (8%
increase)
SQA Attainment
Statistics
published
annually. 
Reported at Year
10, 15, 20
31/03/2044 Hazel
Sly
Education
Officer
Page 149

Page 150

Page 138 of 142 
Peop.BR.3 People EY
STEM
Increase in positive
leaver destinations
of young people.  
33% Entering
Higher
Education 
36% Entering
Higher Education 
Data published
annually in public
performance
report
Reported at Year
10, 15, 20
31/03/2044 Hazel
Sly
Education
Officer
Peop.BR.4 People EY
STEM
Increase in the
aspirations of
young people to
access STEM
related careers
Qualitative
measure
Qualitative
measure
Qualitative
internal measure
using feedback
surveys and
consultation with
young people 
Annually  31/03/2032 Hazel
Sly
Education
Officer
Peop.BR.5 People EY
STEM
Strengthening of
Science Capital
within families
Qualitative
measure
Qualitative
measure
Qualitative
internal measure
using feedback
surveys and
consultation with
families 
Annually  31/03/2032 Hazel
Sly
Education
Officer
Peop.BR.6 People EY
STEM
Increase in skills
within Moray’s
education sector
28 STEM
Champions
across ELC and
primary
settings. 
60 STEM
Champions across
ELC and Primary
Settings
Internal measure Annually  31/03/2032 Hazel
Sly
Education
Officer
Peop.BR.7 People EY
STEM
Increase in training
opportunities
within Moray’s
education sector
0 10 CPD sessions
held annually
Internal
measure. 
Annually  31/03/2032 Hazel
Sly
Education
Officer
Peop.BR.8 People EY
STEM
Increase in skills
levels of Moray
residents
0 10 Community
STEM Learning
Events held
annually 
Internal measure Annually  31/03/2032 Hazel
Sly
Education
Officer
Peop.BR.9 People EY
STEM
Increase in learning
opportunities,
activities and
events offered to
young people and
families
0 9000 pupils
engagements per
annum with
STEM starts. 
Internal measure Annually  31/03/2032 Hazel
Sly
Education
Officer
Page 150

Page 151

Page 139 of 142 
Peop.BR.10 People EY
STEM
Increase in young
people, families,
and communities
accessing
inspirational
learning
environments
0 10 public
engagement
events delivered,
300 engaged
Internal measure Annually  31/03/2032 Hazel
Sly
Education
Officer
Peop.BR.11 People EY
STEM
Increase in climate
awareness of
young people and
the wider
community
0 2000 pupils
engaged per
annum at the
environmental
education centre 
Internal measure Annually  31/03/2032 Hazel
Sly
Education
Officer
Peop.BR.12 People EY
STEM
Increase in the
awareness of
Morays residents
of the STEM career
opportunities in
Morays local
economy 
Qualitative
measure
Qualitative
measure
Qualitative
internal measure
using feedback
surveys and
consultation with
users
Annually  31/03/2032 Hazel
Sly
Education
Officer
Peop.BR.13 People EY
STEM
Increase in
community and
employer
participation in the
upskilling of young
people
108 STEM
Ambassadors
registered on
STEM
Ambassador
portal
162 STEM
Ambassadors
registed on STEM
Ambassador
Portal 
Data provided by
SSERC
Annually  31/03/2032 Hazel
Sly
Education
Officer
Pop.BR.1 Population EY
STEM
Increase in Health
and Wellbeing of
young people
Qualitative
measure
Qualitative
measure
Qualitative
internal measure
using feedback
surveys and
consultation with
young people 
Annually  31/03/2032 Hazel
Sly
Education
Officer
Plac.BR.1 Place EY
STEM
Increased access to
specialist learning
facilities and digital
infrastructure to
support learning
pathways across all
ages. 
0 Creation of 5
STEM Centres
accessible to
wider community
(4 fixed: 1
mobile)
Internal measure Annually  31/03/2032 Hazel
Sly
Education
Officer
Page 151

Page 152

Page 140 of 142 
Plac.BR.2 Place EY
STEM
Improvement of
local services and
facilities accessed
by the public
0 Creation of 5
STEM Centres
accessible to
wider community
(4 fixed: 1
mobile)
Internal measure Annually  31/03/2032 Hazel
Sly
Education
Officer
Plac.BR.3 Place EY
STEM
Town centre
regeneration and
increase in town
centre activity 
0 Creation of 5
STEM Centres
accessible to
wider community
(4 fixed: 1
mobile)
Internal measure Annually  31/03/2032 Hazel
Sly
Education
Officer
Fair.BR.1 Fairer
Scotland Duty
EY
STEM
Increased access
through building
design 
Creation of 5
STEM Centres
accessible to
wider community
(4 fixed: 1
mobile)
Internal measure Annually  31/03/2032 Hazel
Sly
Education
Officer
Fair.BR.2 Fairer
Scotland Duty
EY
STEM
Reduction in rural
inequality  
Creation of 5
STEM Centres
accessible to
wider community
(4 fixed: 1
mobile)
Internal measure Annually  31/03/2032 Hazel
Sly
Education
Officer
Figure 21 Benefits Monitoring Plan
Page 152

Page 153

Page 141 of 142 
Outline arrangements for post project evaluation
The outline arrangements for post implementation review (PIR) and project evaluation review (PER) have been established in
accordance with best practice and Moray Council Policy and will be developed in the delivery phase. 
The Early Years STEM Project budget includes an allowance for the following: 
▪ Annual evaluation of benefits realised.
▪ Critical review of Phase 1 activity to provide adjustments, if necessary, to Phase 2 & 3 activity to optimise benefits
▪ Final project evaluation/reporting in 2031/32 to close project. 
Gateway review arrangements
The strategy, framework and plan for dealing with stage gate review as per Moray Council Governance Policy can be accessed
here: 
http://smi.moray.gov.uk/MPG/01%20Governance%20and%20Templates/Project%20Management%20Governance%20Policy.docx 
Contingency Plans 
If red rated risks start to pose a threat to delivery or Phase 2 sites fail to progress, the following measures are in place to ensure
delivery of the required services and outputs: 
▪ Capital development for the Elgin Centre is being developed with a range of M&E and building fabric upgrade options.
Should costs exceed budget the minimal intervention option will be taken forward. 
▪ Should the project fail in the acquisition of phase 2 sites, alternative locations have been identified and can be taken forward. 
Page 153

Page 154

Page 142 of 142 
Page 154