Democracy Spraffa

Supplementary Agenda Document Pack - Moray Council - 30/09/2026

Moray Council · 30 September 2026
Back to Moray Council — 30 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

Moray Council 
Wednesday, 30 September 2026 
The undernoted report(s) has been added to the agenda for the meeting of Moray
Council at 09:30, in terms of Section 50B (4)(b) of the Local Government (Access to
Information) Act 1985 by reason of special circumstances on the Chair accepting the
report as urgent business. 
NOTE REFERRED TO:- 
7a. External Audit - Annual Report to Members on 25-26 Audit
Report by Executive Director Finance, Strategy and Performance
3 - 132
7b. Audited Annual Accounts for the period 1 April 2025 to 31
March 2026
Report by Executive Director Finance, Strategy and Transformation
133 -
144
7c. Connected Charities Audited Annual Accounts 1 April 25 to
31 March 26
Report by Executive Director Finance, Strategy and Transformation
145 -
174 
Page 1

Page 2

Page 2

Page 3

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director, Finance, Strategy and Transformation  
Author: Jon Matthews Contact Email:  jon.matthews@moray.gov.uk 
Subject: External Audit – Annual Report to Members on 2025/26 Audit 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to provide the External Auditor’s Annual Audit Report to
Council on the 2025/26 accounts.  
1.2 This report is submitted to Council for consideration as part of a suite of reports on the
Annual Audit and Accounts for 2025/26.  
1.2  This report is submitted to Council in terms of Section III (B) (16) of the Council’s Scheme
of Administration relating to keeping accounts for the proper recording of all transactions
of the Council and to audit such accounts.  
2.  REASON FOR URGENCY  
2.1  This report is submitted to Council in terms of the Local Government (Access to
Information) Act 1985, on the Chair certifying that, in her opinion it requires to be
considered on the grounds of urgency in order to give early consideration to statutory
deadlines under The Local Authority Accounts (Scotland) Regulations 2014 which requires
annual accounts to be approved and published by 30 September each year.  
3.  SUMMARY 
3.1 The report introduces the External Auditor’s Annual Audit Report for 2025/26 from Grant
Thornton. The report covers the audit of the annual accounts, wider scope and Best Value
work, and progress against previous audit recommendations. Audit testing focused on key
areas including management override of controls, expenditure recognition, asset
valuations and pension liabilities, with the auditor concluding that the significant
judgements and estimates used in preparing the accounts were appropriate and
balanced. The auditor’s assessed the Council’s key judgements and estimates used in
preparing the accounts was appropriate and balanced. 
Item 7a.
Page 3

Page 4

3.2 The wider scope audit identified ongoing financial sustainability as a significant risk due to
the budget gap forecast within the Council’s Medium to Long Term Financial Strategy.
However, the report recognises the positive progress made in implementing previous audit
recommendations, with 11 of 13 prior year actions completed and the remaining two in
progress. A Best Value thematic review of asset management identified three
recommendations, while a single new recommendation has been made to ensure
governance arrangements remain fully aligned with the revised CIPFA/SOLACE guidance.
Progress on previous financial statement recommendations continues, with two actions
completed and five ongoing. 
4.  RECOMMENDATIONS.  
4.1 It is recommended that Council consider and note the contents of the Annual Audit
Report 2025/26.   
Jon Matthews
Executive Director, Finance, Strategy and Transformation (Section 95 OƯicer) 
5.  BACKGROUND AND CONTEXT  
5.1 The Council’s External Auditor, Grant Thornton, provides an Annual Report to those in
charge of governance who are the Council and the Controller of Audit. This report is a
significant document and covers: 
 The audit of the 2025/26 annual accounts
 Wider Scope and Best Value
 Action Plan recommendations from the External Auditor and management’s
response  
5.2 A copy of the External Auditor’s Annual Audit is attached as APPENDIX 1. A representative
of the Council’s External Auditor will present the report at the meeting. 
5.3 The report coincides with the completion of the Annual Audit of the Council’s Annual
Accounts, which is also on the agenda of this meeting.  The Council has received an
unqualified Audit Opinion for 2025/26 on the council’s annual accounts. 
6. PROPOSALS   
ANNUAL AUDIT REPORT 
Audit of the Accounts
6.1 The main amendments to the final accounts from the draft accounts are explained in the
covering report to the audited Annual Accounts, which is another item on the agenda for
this meeting. A material prior period adjustment has been identified for the Council
dwellings, which was driven by an error in the methodology applied to the 2020/21
valuation, the impact of which was exacerbated by rolling this value over the intervening
years. This is a non-cash item adjustment and only impacts unusable reserve balances. 
6.2 Audit planning identified four key risks: management over-ride of controls (a presumed
risk in all audits), fraud in expenditure recognition (a presumed risk in all audits), valuation
Page 4

Page 5

of land and buildings and defined benefit pension scheme valuation.  The auditor’s
assessment of key judgements and estimates used in preparing the accounts was
appropriate and balanced on all five areas considered.  Other areas of audit focus arise
from audit compliance requirements or from areas of complexity or importance to the
users of the accounts. 
Wider Scope and Best Value
6.3 Audit work included consideration of financial sustainability; financial management;
vision, leadership and governance, and use of resources to improve outcomes. Audit
planning identified one significant risk in respect of financial sustainability. At the close of
the audit the risk in respect of financial sustainability remained on the basis that the
Medium to Long Term Financial Strategy identifies a significant budget gap over the life of
the strategy. 
6.4 The report recognises the positive steps taken by the Council to implement the
recommendations raised in the prior year reporting and it is clear the Council have
embraced the recommendation process. By building these elements into business as
usual, a trajectory of sustained improvement is evidenced. In total, there were 13 prior
year recommendations with 11 complete and two in progress. 
Best Value Thematic – Asset Management
6.5 Best Value is reported in the Thematic Review and the Best Value Thematic report was
reported to Audit and Scrutiny Committee on 18 June 2026 (Paragraph 13 of the Minute
refers). In total, there were three recommendations. No follow up on the progress of
actions has been carried out given the agreed timescale for the implementation of each
recommendation. 
Audit Recommendations – Financial Statements Audit
6.6 One recommendation relating to the Council’s financial statement preparation has been
made. It recommends that the Council incorporate the requirements and expectations of
the revised CIPFA/SOLACE guidance, ensuring that governance arrangements remain
current, eƯective and fully aligned with the requirements applicable from 2025/26
onwards.  
6.9 Progress against prior recommendations related to the financial statement preparation is
also reported on with two actions completed and five currently still on-going. 
7. SUMMARY OF IMPLICATIONS  
7.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal ✓ 
Financial ✓ 
Risk ✓ 
StaƯing ✓ 
Page 5

Page 6

Best Value and Transformation ✓ 
Property  ✓
Information Communications Technology/Digital             ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change and Biodiversity Impact  ✓ 
7.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
This is referred to in Appendix 1 to the report.   
7.3 Policy and Legal 
The audit is conducted in terms of statutory powers aƯorded to Grant Thornton, the
appointed External Auditor for the Council. 
7.4 Financial 
The report notes that the current level of service provision is not financially sustainable.
This is consistent with sectoral pressures because of multiple years of below inflationary
funding to Local Authorities. As noted in Grant Thornton’s report, delivery of the Council’s
transformation strategy is the main means to close this financial gap.   
7.5 Risk 
The work undertaken by External Audit provides assurance to Members on the Council’s
performance management, financial statements and the actions taken by the Council to
address significant matters arising out of the audit process. 
7.6 StaƯing 
Preparation of the Council’s annual financial statements requires significant resource
input as part of the scheduled work of the accountancy team within Financial Services
and from other services across the Council.  
7.7 Best Value and Transformation 
The work undertaken by External Auditors provides encouraging commentary on the pace
and progress of best value and transformation.
Page 6

Page 7

7.8 Property 
There are no property issues arising directly from this report.    
7.9 Information Communications/Technology/Digital 
There are no information communications/technology/digital issues arising directly from
this report.  
7.10 Equalities, Social Inclusion and Economic Impact  
Does the proposal have the
potential to aƯect people from the
below categories diƯerently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - The Annual Accounts are a retrospective statement of the Council's
financial performance and do not, in themselves, result in any change to services or
policy. Accordingly, no direct impacts on equalities, social inclusion, or the economy
have been identified. 
7.11 Climate Change and Biodiversity Impacts 
There are no climate change and biodiversity issues arising directly from this report. 
8. CONSULTATION  
8.1 The content of APPENDIX 1 to this report has been discussed with CLT and relevant
oƯicers of the council.   
9. BACKGROUND PAPERS  
9.1 All background papers held by Finance.
Page 7

Page 8

Page 8

Page 9

Moray Council
Annual Audit Report
Financial year ending 31 March 2026
25 September 2026
Prepared for those Charged with Governance and the
Accounts Commission
Page 9

Page 10

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
GUIDANCE NOTES:
Table of contents does not
update automatically
• Please delete or factor in
any instruction slides at
the start of the deck
before pagination
• Please populate the page
numbers manually before
distributing
Table of contents
2
01 Executive summary 03
02 Introduction 11
03 Audit of the annual report and accounts 14
04 Wider scope and best value conclusions 49
Appendices
A Audit adjustments 82
B Action plan and recommendations– financial statements audit 92
C Action plan and recommendations– Best value thematic 93
D Progress against Controller of Audit recommendations 95
E Follow up of prior year audit recommendations 98
F Audit fees, ethics and independence 118
G Client Service Review 121
H Communication of audit matters 122
Tip – Select View/Outline
View, Right click and select
"Collapse" and copy slide
titles then paste into your
table of conents
Don’t forget to change the
footer
The contents of this report relate only to the matters which have come to our attention,
which we believe need to be reported to you as part of our external audit process. It is not a
comprehensive record of all the relevant matters, which may be subject to change, and in
particular we cannot be held responsible to you for reporting all of the risks which may
affect the Council or all weaknesses in your internal controls. This report has been prepared
solely for your benefit and Audit Scotland (under the Audit Scotland Code of Audit Practice
2021). We do not accept any responsibility for any loss occasioned to any third part acting,
or refraining from acting on the basis of the content of this report, as this report was not
prepared for, nor intended for, any other purpose.
Page 10

Page 11

Executive summary01
Page 11

Page 12

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Executive summary
4
This table summarises the key findings and other matters arising from the external audit of Moray Council and its Group and the preparation of the financial
statements for the year ended 31 March 2026 for those charged with governance  (full Council) and the Accounts Commission.
Financial statements
Under International Standards of Audit (UK) (ISAs) and Audit Scotland’s Code
of Audit Practice ('the Code'), we are required to report whether, in our
opinion:
• The Group and Council financial statements give a true and fair view of
the state of affairs of the Council and its group as at 31 March 2026 and
of the income and expenditure of the Council and its group for the year
then ended;
• the Group and Council financial statements have been properly prepared
in accordance with  UK adopted international accounting standards, as
interpreted and adapted by the 2025/26 CIPFA Code of Accounting
Practice;
• the Group and Council’s financial statements have been prepared in
accordance with the requirements of the Local Government (Scotland) Act
1973, The Local Authority Accounts (Scotland) Regulations 2014, and the
Local Government in Scotland Act 2003; and
• the audited part of the Remuneration Report has been properly prepared
in accordance with The Local Authority Accounts (Scotland) Regulations
2014.
We are required to report whether the information given in the Management
Commentary is consistent with the financial statements and has been
prepared in accordance with statutory guidance issued under the Local
government in Scotland Act 2003.   We are also required to report on
whether the information given in the Annual Governance Statement is
consistent with the financial statements and prepared in accordance with
the Delivering Good Governance in Local government: Framework (2016).
Subject to the satisfactory completion of outstanding items outlined at page ten, we
anticipate issuing an unmodified opinion for Moray Council after the Council
meeting on 30 September 2026. We also anticipate issuing an unmodified opinion for
The Moray Council Connected Charity.
We have concluded that the Remuneration Report has been prepared in accordance
with requirements. 
We have concluded the work on the Governance Statement has been prepared in
accordance with the relevant guidance.
We have concluded that the other information to be published alongside the financial
statements is consistent with our knowledge of the Council.
Draft financial statements
The draft financial statements were presented for audit by the deadline of 30 June
2026, with the Council authorising their financial statements on that date. 
The draft version of the accounts presented for audit did not include updated Council
Dwellings figures for 2025/26, as the valuation of these assets had not taken place.
We agreed with the Council that once these valuations had been received, the draft
accounts would be updated to include the final Council Dwellings figures. This version
of the accounts was received on 30 August 2026.  
Target completion dates
The target completion dates for the 2025/26 audit was 30 September 2026. 
Subject to the completion of the completion of the outstanding items it is anticipated
that the target timeline can be achieved, with this Auditor’s Annual Report planned to
be presented to full Council and the audit opinion signed by the 30 September 2026
deadline.  Page 12

Page 13

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Executive summary (2)
5
Financial statements
Amendments to the primary financial statements
There have been material primary statement adjustments and disclosure
amendments.  The significant adjustments are summarised in more detail, with all
amendments noted in Appendix A. 
The impact upon the primary statements has been material, to decrease the
balance sheet net assets by £234.666 million.  The change meant that the Council
went from reporting a comprehensive net expenditure of £195.507 million to a
comprehensive net expenditure of £3.511 million.
The significant adjustments from the draft financial statements in the primary
statements are summarised below and have all been adjusted by management:
• the accounts presented for audit did not include the Council Dwellings figures for
2025/26 as the information was not yet received.  Once received, management
revised the accounts, which resulted in the valuation of Council Dwellings at 31
March 2026 decreasing to £280.6 million. This was a decrease of £215 million
from the prior period closing balance of £495.6 million. This impacted unusable
reserves only.
• the closing balance of 2024/25 Council Dwellings has decreased by £194.2 million
from £495.6 million to £301.4 million.  The misstatement was identified from
challenging management about the significant reduction in the 2025/26
revaluation of Council Dwellings. As a result, an error was identified in the
methodology used in the Council's 2020/21 internal valuation, which failed to
capitalise rental streams as required by applicable guidance. Therefore, the
2020/21 valuation had given an incorrect value for Council Dwellings which has
continued to roll forward in future years. There was no impact on the 2025/26
figures as the valuation was correctly calculated by the VOA, however the prior
period figures required to be amended to ensure the opening balances and
impact on reserves were correct. This impacted unusable reserves only.
• the closing liability balance in relation to the Council’s PFI schemes required
to be updated due to an error processed in the calculation adjustment in
2024/25 as part of the transition adjustment to IFRS 16. The resulted in the
overall liability decreasing by £6.035 million in 2025/26 and impacted
unusable reserves only
• other land and buildings has increased by £6.040 million as a result of the
Council recognising a provision for the ongoing monitoring of the Nether
Dallachy landfill site, which closed in May 2025. The Council had previously
only recognised a contingent liability for Nether Dallachy. The Council has
correctly capitalised the provision and there was no impact on reserves.
Council Dwellings Valuation
In line with the Council’s five year valuation cycle, the Council were required to
complete a full valuation of their Council Dwellings in 2025/26. The previous
valuation took place in 2020/21 and was undertaken by the Council’s own
internal valuer. For the 2025/26 valuation, the Council commissioned the
Valuation Office Agency (VOA) to undertake the valuation of their Council
Dwellings. 
Early in 2026, the Council made us aware that the final valuation figures
would not be available for inclusion in the unaudited accounts approved by
the Council in June 2026. As a result, the first set of accounts presented for
audit included 2024/25 Council Dwelling figures.
The Council received their Council Dwellings valuations in mid-August, in line
with the agreed timeframe, however as mentioned previously, the valuation
was significantly lower than the previous valuation, with a final valuation for
2025/26 of £280.6 million.
Page 13

Page 14

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Executive summary (3)
6
Financial statements
Council Dwellings Valuation (continued)
Management challenged the VOA to understand the decrease in value, with VOA
confirming they had followed a standard valuation approach. As a result of this
challenge, we did not receive an updated version of the accounts including full
Council Dwellings revaluation figures until 30 August 2026.
We confirmed that the methodology used in the 2025/26 valuation was
appropriate. However, we identified that the previous full internal valuation
completed in 2020/21 was calculated incorrectly due to an error in the EUV-SH
adjustment factor methodology, which failed to capitalise rental streams as
required by applicable guidance. Therefore, the 2020/21 valuation had given an
incorrect value for Council Dwellings which has continued to roll forward in future
years. As a result, we requested the Council reconstruct the 2020/21 adjustment
factors on the correct basis.
The audit team have reviewed the updated valuation methodology and confirmed
it is reasonable. As a result of the error, the Council posted a prior period
adjustment, detail of which is disclosed at Note 2 of the accounts. The overall
impact was that the 2024/25 closing balances for Council Dwellings decreased
by £194 million.
Application of Indexation and Fixed Asset Register reconciliation
The 2025/26 Code of Practice on Local Authority Accounting introduced a
significant change to the accounting treatment of non-investment assets by
permitting the use of indexation in intervening years between full asset
revaluations. We assessed the Council application of indexation across the
population of assets not revalued and confirmed the approach was reasonable,
with appropriate accounting entries made.
During our previous audits, we have encountered issues with the reconciliation
processes in place for the compilation of the PPE Note and an audit
recommendation was raised as a result. This issue re-occurred in 2025/26, and
we confirmed that there were reconciling differences between the PPE Note, the
Fixed Asset Register and the valuers report. This added time into our audit
procedures, as we needed to understand the reasons behind all variances.
It should be standard practice that the Council ensure the Fixed Asset Register
and indexation working paper agrees to the financial statements and there
should be a standard working paper presented for audit that balances. We have
rolled forward the recommendation raised in the prior year audit at Appendix E.
We had raised a recommendation in our previous audit that the Council should
ensure there is early discussion with any new valuer to ensure the valuer is aware
of the requirements and responsibility for audit. During 2025/26, the response
rate to audit queries was slower than expected, however we received all required
data in full to support our audit conclusions. The audit team needed to follow up
a number of audit requests due to incomplete information, which resulted in
delays to procedures and prevented us completing the valuations work in line
with our anticipated workplan. We had aimed to complete the PPE valuations
work in advance of the Council Dwellings procedures since this information was
not included in the unaudited accounts.
Page 14

Page 15

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Executive summary (4)
7
Financial statements
Working papers
The working papers presented for audit were provided on time, but for some areas
improvement is required. We have previously raised a recommendation in asking
the finance team to review the working papers presented for audit, however these
were largely in the same format as previous years. There continued to be
instances where “hard coded” information was included in the working papers,
which adds more difficulty into the audit process.  The Council have confirmed
they intend to review working papers being prepared and presented to audit.  The
recommendation raised in the prior year audit remains open and is noted at
Appendix E.
Unadjusted misstatements and recommendations
We also identified potential misstatements during the audit from our testing.
Management have decided not to adjust the financial statements as the
misstatements identified are not material. The decision to not amend for these
issues does not impact the proposed audit opinion.  Further detail is in Appendix A.
We have raised one recommendation for management from our audit work on the
financial statements. This is set out in Appendix B.
Our follow up of the financial statement recommendations made in the prior year
audit are detailed in Appendix E.  Of the seven recommendations made in previous
audits, two have been cleared with two in progress and three still open.
As noted, we would like to record our appreciation for the assistance provided by
the finance team and other staff including the internal valuer and revenues staff
during the audit.
Audit fee
The audit team have been required to carry out significant additional audit work
as part of our 2025/26 audit. During our financial statements audit work, we
needed to complete additional work on non-current asset valuations. This was
primarily a result of the late receipt of the Council Dwellings valuation in August
2026 and the resultant prior period amendment required. We needed to liaise with
the VOA to understand their existing methodology and the differences from the old
methodology. Once it was agreed the previous valuation had been completed
incorrectly, we had to review the Council’s updated values and confirm they were
input into the accounts correctly. To conclude on the work on the council house
valuations we required consultation with our audit approach, financial reporting
and valuation teams within Grant Thornton.
Our work around land and buildings valuations also took longer than planned due
to the high level of engagement with the valuer to request further information. This
required additional auditor time to work through the significant number of queries
raised.
We were also required to undertake additional audit procedures over the provision
relating to the decommissioned landfill site at Nether Dallachy. This work arose as
a result of audit challenge and included a detailed review of management’s
calculations supporting the new provision recognised in the 2025/26 financial
statements.
A new auditing standard (ISA 600) and updated accounting standard (IFRS 16)
were introduced during 2024/25. This has resulted in us completing additional
audit testing during 2052/26, both during our planning and year end procedures.
Page 15

Page 16

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Executive summary (5)
8
Financial statements
Audit fee (continued)
We identified in our audit plan that we would be required to follow up a number of
previous audit recommendations made, both in our financial statements audit and
in relation to our wider scope audit responsibilities. The wider scope audit has
required increased levels of scrutiny and reporting, driven by historical issues and
the number of significant areas of focus identified during the year.
Based on all of the above issues, we anticipate charging an additional audit fee
for the issues identified during 2025/26, including for the additional work required
due to the impact of the wider scope work.  This has been set at £42,780. The Trust
Fund audit is outside of the base audit fee, and this was set at the planning stage
at £7,500.  Therefore, the increase in audit fees from the base is £50,280. This is
further set out in Appendix F.
The additional audit fee has been discussed with management during the course
of the audit.
Page 16

Page 17

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Executive summary – Wider Scope and Best Value
9
Financial statements
Wider Scope and Best Value
In our External Audit Plan for the year ended 31 March 2026, we documented our
assessment of the wider scope risks and planned audit work.  At the planning stage
we identified one significant risk in respect of financial sustainability.
There remains a significant risk around financial sustainability due to the Council
needing to identify a further £8.185 million of savings up to financial year 2028/29.  
The Council’s Medium to Long Term Financial Strategy also confirms that further 
significant savings will be required to bridge the projected funding deficit over the
longer term. The Council must identify ways to alleviate the significant budget gap
over the life of the strategy.
Full details of the wider scope work undertaken are outlined on pages 36 to 66. We
have raised no new wider scope recommendation for management as a result of our
wider scope work in 2025/26.
The follow up of prior year wider scope and thematic recommendations is set out at
Appendix E. There were thirteen in total and review of these recommendations have
concluded that eleven are complete and two are in progress.
The Council has taken positive steps to implement the recommendations raised in the
prior year reporting and it is clear the Council have embraced the recommendation
process. By building these elements into business as usual, a trajectory of sustained
improvement is evidenced.
Councils have a statutory duty to make arrangements to secure continuous
improvement in the performance of their functions. Expectations are laid out in the
Best Value Revised Statutory Guidance 2020. As set out in the Code of Audit Practice
2021, Best Value audit is integrated with other wider-scope annual audit work.
For 2025/26, the scope of Best Value work included conclusions on:
• The Accounts Commission's requested thematic work on transformation
• Progress made against recommendations raised in the Controller of Audit Report
• Effectiveness of council performance reporting
• Council service performance improvement.
Thematic Review – Asset Management
The key findings from the thematic review are summarised in this report at pages 77
- 80, with the separate thematic report presented to the 18 June 2026 Audit and
Scrutiny Committee meeting.
An action plan within the thematic review report notes three recommendations, with
the Council’s agreed response to the actions suggested. This has been replicated at
Appendix C.  No follow up on the progress of actions has been carried out given the
agreed timescale for the implementation of each recommendations, however we do
note that the Council approved a revised Corporate Asset Management Plan at the
Corporate Committee meeting held on 26 August 2026.
Controller of Audit Best Value Report
We contributed to the Controller of Audit Best Value report published in March
2024. The Council produced a comprehensive Best Value Action Plan to address the
findings of the Controller of Audit report, and combined any other outstanding
findings from external audit, previous best value reports and external consultant
reports into one Action Plan.
We have included a follow up on the Controller of Audit recommendations at
Appendix D. All nine recommendations from the review are now closed, however two
have been superseded by further recommendations raised as a result of our wider
scope work.
Page 17

Page 18

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Executive summary – Status of Audit Work
10
Status of Audit Work
Outstanding Matters
As an audit team we have focused on concluding our work on the key audit
matters, the significant audit risks and the significant classes of transactions we
have identified in our scoping.  These are the areas of the accounts that are, in
our view, at greater risk of material misstatements, with a potential to impact our
auditor’s opinion.
We are currently progressing our work in the following areas as part of the audit:
• finalising our review of the amendments made to the accounts during the
audit.
Our work is subject to the following closing procedures which necessarily take
place within the concluding stages of the audit:
• receipt of management representation letter
• review of the final set of financial statements
• receipt of final signed financial statements
• final sign off by the engagement lead
• receipt of management’s updated going concern and post balance sheet
events assessment at the date of sign off
Audit quality is important to us, and it is important as auditors that we take a step
back to consider all our audit evidence and the quality of our audit work on file on
completion.  This includes sufficient documentation of our key auditor judgements
and conclusions.
Page 18

Page 19

Introduction02
Page 19

Page 20

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Introduction
Scope of our audit work
Our work has been undertaken in accordance with International Standards of
Auditing (ISAs) (UK) and the Code.
This report is addressed to the Council and the Accounts Commission and will be
published on Audit Scotland's website www.audit-scotland.gov.uk in due course.
This report is a summary of our findings from our external audit work for the
financial year at Moray Council.  The scope of our audit was set out in our
External Audit Plan.
The core elements of our audit work in 2025/26 have been:
• An audit of the Council and Group’s annual report and accounts for the
financial year ended 31 March 2026 [findings reported within this report];
• Consideration of the wider dimensions that frame the scope of public audit as
set out in Audit Scotland’s Code of Audit Practice 2021 (‘the Code’) [within this
report];
• An audit of the Connected Charity annual report and accounts for the
financial year ended 31 March 2026.
• Monitoring the Council’s participation in the National Fraud Initiative (NFI);
and
• Any other work requested by Audit Scotland.
Note that the following work is also required that is currently in progress:
• certification of Housing Benefits subsidiary claim. The audit deadline is by 30
November 2026, and work will commence in September 2026.
• Certification of the NDR return (Non- Domestic Rates). The audit deadline is 08
October 2026. To date, we have carried out sample testing over reliefs granted
during 2025/26 and will complete the remaining certification work in
September 2026. 
Responsibilities
The Council has primary responsibility for ensuring the proper financial
stewardship of public funds. This includes preparing annual accounts in
accordance with proper accounting practices. The Council is also responsible for
compliance with legislation, and establishing arrangements over governance,
propriety and regularity that enable it to successfully deliver its objectives.
Our responsibilities as independent auditors, appointed by the Accounts
Commission, are set out in the Local Government in Scotland Act 1973, the Code
and supplementary guidance, and International Standards on Auditing in the
UK.
The recommendations or risks identified in this report are only those that have
come to our attention during our normal audit work and may not be all that
exist. Communication in this report of matters arising from the audit or of risks or
weaknesses does not absolve officers from their responsibility to address the
issues raised and to maintain an adequate system of control.
Audit approach
Our audit approach was based on a thorough understanding of the Council and
is risk based, and in particular included:
• An evaluation of the Council’s internal control environment, including its IT
systems and controls; and
• Substantive testing on significant transactions and material account
balances, including the procedures outlined in this report in relation to the key
audit risks.
12
Page 20

Page 21

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Introduction (2)
Adding value through our audit work (continued)
We aim to add value to the Council throughout our audit work. We do this
through using our wider public sector knowledge and expertise to provide
constructive, forward looking recommendations where we identify areas for
improvement and encourage good practice around financial management,
financial sustainability, risk management and performance monitoring. In so
doing, we aim to help the Council promote improved standards of governance,
better management and decision making, and more effective use of resources.
We have invited members of your financial reporting team to our annual Local
Government Chief Accountants workshop and members of the Audit and
Scrutiny Committee to a webinar on Audit Committee effectiveness, both of
which were led by our internal financial reporting technical team.
We provide the Council with relevant sector updates prepared by our financial
reporting team throughout the year.
We also look to bring forward audit testing where possible by performing an
interim audit which was delivered in March 2026. Early testing covered NDR
reliefs and payroll for the first nine months of the financial year. This helped
provide a smooth and efficient audit process to support delivery for the year end
audit.
13
Page 21

Page 22

Audit of the annual
report and accounts
03
Page 22

Page 23

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Audit of the annual report and accounts
Approach to the audit of financial statements
Key audit matters and significant risks
The following significant risks/ key audit matters have been identified:
• Management override of controls (significant risk);
• Valuation of land, buildings and council dwellings (significant risk and key audit
matter);
• Valuation of the defined benefit pension scheme (significant risk and key audit
matter);
Internal control environment
In accordance with ISA requirements, we have developed an understanding of the
Council’s control environment. Our audit is not controls based and we have not
placed reliance on controls operating effectively as our audit is substantive in
nature. In accordance with ISAs, over those areas of significant risk of material
misstatement we consider the design of controls in place.
However, we do not place reliance on the design of controls when undertaking our
substantive testing. We identified no material weaknesses or areas of concern from
this work which would have caused us to alter the planned approach as
documented in our plan.
Recap of our audit approach and key changes in our audit strategy
We have not identified any changes in our approach since our Audit Plan was
presented to the Audit and Scrutiny Committee on 25 March 2026. The risks
identified remain the same.
The group scoping is as reported, with specific audit procedures performed over
material balances for the Common Good and Trust Funds and analytical
procedures in relation to the consolidation of the group bodies consolidated on a
joint venture basis.
15
Key audit
matters
Scoping
Materiality
Page 23

Page 24

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Our application of materiality
We apply the concept of materiality both in planning and performing the audit, and in evaluating the effect of identified misstatements on the audit and of
uncorrected misstatements, if any, on the financial statements and in forming the opinion in the auditor’s report. The concept of materiality is fundamental to the
preparation of the financial statements and the audit process and applies not only to the monetary misstatements but also to disclosure requirements and adherence
to acceptable accounting practice and applicable law. 
Our audit approach was set out in our audit plan. 
• We reviewed and updated our assessment of materiality from planning based upon your 2025/26 draft financial statements and concluded that materiality is
£10.069 million for the Group (PY £8.104 million) and £9.566 million for the Council (PY £7.678 million), which equates to approximately 2.5% for the Group (PY 2%)
and 2.35% for the Council (PY 1.9%) of your 2025/26 gross expenditure less IJB contributions of the Group and the Council.
• Performance materiality was set at £7.552 million (Group) (PY £5.673 million) and £7.175 million (the Council) (PY £5.374 million) representing 75% of our calculated
materiality (PY 70%).
• We report to Officers (Management) any difference identified over £0.504 million (Group) and £0.478 million (the Council) representing 5% of our calculated
materiality (PY £0.405 million and £0.384 million respectively).
• Due to the public interest in senior officer remuneration disclosures, we apply specific audit procedures to this work and set a lower materiality level for this area of
£25,000 (PY £25,000). We design our procedures to detect errors in specific accounts at a lower level of precision which we have determined to be applicable for
senior officer remuneration disclosures. We evaluate errors in the remuneration report for both quantitative and qualitative factors against this lower level of
materiality. We will apply heightened auditor focus on the completeness and clarity of disclosures in this area and will request amendments to be made if any
errors exceed the threshold we have set or would alter the bandings reported for any individual.
There is a change in materiality values since our final audit plan was communicated to you in March 2026 as final gross expenditure for 2025/26 was used as the
basis of the calculation.  The percentage chosen for higher materiality, performance materiality and triviality remains unchanged.
16
Page 24

Page 25

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Overview of the scope of our audit
Understanding the group, the Council, and its components, and their
environments, including group-wide controls
The engagement team obtained an understanding of the Council, the group and
its environment, including group-wide controls, and assessed the risks of
material misstatement at the group and Council only level;
Identifying significant components
We evaluated the significance of each component of the group and determined
the planned audit response based on a measure of materiality.
Work to be performed on financial information of Council and other
components (including how it addressed the key audit matters)
A full scope audit was performed on Moray Council. Specified procedures were
performed over material balances for the Common Good and Trust Fund. An
analytical approach for the entities consolidated as joint ventures was
undertaken. No additional key audit matters were identified in group
transactions.
Performance of our audit
The full scope audit was conducted on the Council. Our work has covered all
material balances and transactions in expenditure, income, assets, liabilities and
reserves as well as other primary statements and disclosure notes.
The specific procedures for the Common Good and Trust Funds included testing
of material balances of Property. Plant and equipment and cash balances within
the common goods and trust funds consolidation, including any material
reserves.
The analytical procedures for the consolidation of the joint ventures and
associated accounting entries and reserves agreed the basis of the consolidation
and the values to the other entity financial statements.
Changes in approach from the previous period
There are no additional components in the group compared to 2024/25. There
are no changes from our approach noted in our Audit Plan from March 2026.
17
The Council have a controlling interest in six subsidiary entities and three associate entities. The subsidiaries are the Common Good Funds and five Trust Funds whilst
the associates are the Grampian Valuation Joint Board, Moray Leisure Limited and Moray Integration Joint Board.
We performed a risk-based audit that requires an understanding of the group’s and the Council’s business and in particular matters related to:
Page 25

Page 26

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Group audit approach
18
In accordance with ISA (UK) 600, as group auditor we are required to obtain sufficient, appropriate evidence regarding the financial information of the components
and the consolidation process to express an opinion on whether the group financial statements are prepared, in all material respects, in accordance with the
applicable financial reporting framework.
The table below summarises our final group scoping, as well as the status of work on each component:
Component Scope -
Planning
Scope -
Final
Auditor Status Comments
Moray Council Grant
Thornton UK

Green Our findings are summarised on pages 20-48
Other Trust Funds and
Common Goods Funds
Grant
Thornton UK

Green The audit team performed audit procedures on material balances relating to
PPE, reserves and cash and cash equivalents.
Connected Charitable
Trust Funds, Grampian
Valuation Joint Board,
Moray Leisure Board
and Moray Integration
Joint Board
Grant
Thornton UK
(except for
Moray Leisure
Board)

Green We have not identified any issues from our analytical procedures
undertaken.
Moray Council Full scope audit procedures will be performed to component materiality by the group audit team.
See above Audit of specified financial statement line items to component materiality by the group audit team.
See above Out of scope components are subject to analytical procedures performed by the group audit team to group materiality.
Green Planned procedures are substantially complete with no significant issues outstanding.
Amber Planned procedures are ongoing / subject to review with no known significant issues.
Red Planned procedures are incomplete and / or significant issues have been identified that require resolution.
Page 26

Page 27

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Detecting irregularities, including fraud
Irregularities, including fraud, are instances of non-compliance with laws and regulations.  We design procedures in line with our responsibilities, to detect material
misstatements in respect of irregularities, including fraud.  Owing to the inherent limitations of an audit, there is an unavoidable risk that material misstatements in
the financial statements may not be detected, even though the audit is properly planned and performed in accordance with the ISAs (UK).
The extent to which our procedures are capable of detecting irregularities, including fraud is detailed below:
• We obtained an understanding of the legal and regulatory frameworks that are applicable to Moray Council and its Group and determined that the most
significant which are directly relevant to specific assertions in the financial statements are those related to the reporting frameworks; International Financial
Reporting Standards and the 2025/26 Local Government Accounting Code of Practice.
• We enquired of Senior Officers and the Chair of the Audit and Scrutiny Committee, concerning the Council’s policies and procedures relating to the
identification, evaluation and compliance with laws and regulations; the detection and response to the risks of fraud; and the establishment of internal controls
to mitigate risks related to fraud or non-compliance with laws and regulations.
• We enquired of Senior Officers and the Chair of the Audit and Scrutiny Committee, whether they were aware of any instances of non-compliance with laws and
regulations or whether they had any knowledge of actual, suspected or alleged fraud.
• We assessed the susceptibility of the Council and its group financial statements to material misstatement, including how fraud might occur, by evaluating
incentives and opportunities for manipulation of the financial statements. This included the evaluation of the risk of management override of controls.  We
determined that the principal risks were in relation to journal entries that altered the Council’s financial performance for the year and potential management
bias in determining accounting estimates in relation to the valuation of land and buildings and the estimations in respect of the Council’s defined pension
liability.  Our audit procedures are documented within our response to the significant risk of management override of controls below.
These audit procedures were designed to provide reasonable assurance that the financial statements were free from fraud or error. However, detecting irregularities
that result from fraud is inherently more difficult than detecting those that result from error, as those irregularities that result from fraud may involve collusion,
deliberate concealment, forgery or intentional misrepresentations. Also, the further removed non-compliance with laws and regulations is from events and
transactions reflected in the financial statements, the less likely we would become aware of it.
The team communications in respect of potential non-compliance with relevant laws and regulations, included the potential for fraud in in certain account balances
and significant accounting estimates.
In assessing the potential risks of material misstatement, we obtained an understanding of:
− The Council and its group operations, including the nature of its operating revenue and expenditure and its services and of its objectives and strategies to
understand the classes of transactions, account balances, expected financial statement disclosures and business risks that may result in risks of material
misstatement.
− The Council’s control environment, including the policies and procedures implemented by the Council to ensure compliance with the requirements of the
financial reporting framework.
19
Page 27

Page 28

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Overview of audit risks
The table below summarises the key audit matters, significant and other risks discussed in more detail on the subsequent pages
20
Risk title Risk level Change in risk
since audit plan Fraud risk Key audit matter Level of judgment or
estimation uncertainty
Testing
approach
Status of
work to
date
Management override of controls Significant ✓  Low Substantive 
Green
Valuation of land and buildings Significant  ✓ High Substantive 
Green
Defined benefit pension scheme
valuation Significant  ✓ High Substantive 
Green
↑ Assessed risk increased since Audit Plan
Assessed risk consistent with Audit Plan
↓ Assessed risk decreased since Audit Plan
 Not considered likely to result in material adjustment or change to disclosures within the financial statements (as material amendments have been made in the final financial statements for council dwellings)
 Potential to result in material adjustment or significant change to disclosures within the financial statements
 Likely to result in material adjustment or significant change to disclosures within the financial statements.
Page 28

Page 29

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters
Responding to significant financial statement risks
Significant risks are defined by ISAs (UK) as risks that, in the judgement of the auditor, require special audit
consideration. In identifying risks, audit teams consider the nature of the risk, the potential magnitude of
misstatement, and its likelihood. Significant risks are those risks that have a higher risk of material
misstatement. This section provides commentary on the significant audit risks communicated in the external
audit plan.
Key audit matters
Key audit matters are those matters that, in our professional judgement, were of most significance in our
audit of the group and the Council’s financial statements of the current year and include the most significant
assessed risks of material misstatement (whether or not due to fraud) that we identified.
These matters include those that had the greatest effect on:
• the overall audit strategy;
• the allocation of resources in the audit; and
• directing the efforts of the engagement team.
These matters were addressed in the context of our audit of the financial statements as a whole, and in
forming our opinion thereon, and we do not provide a separate opinion on these matters.
Other risks
Other risks are, in the auditor’s judgement, those where the risk of material misstatement is lower than that
for a significant risk, but they are nonetheless an area of focus for our audit.
21
Description Audit reponse
Disclosures
Key
observations
KAM
Page 29

Page 30

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (2)
22
Significant risks identified in our Audit Plan Risk relates to Commentary
Management override of controls
Under ISA (UK) 240 there is a non-rebuttable presumed risk
that the risk of management override of controls is present in
all entities.
Our risk focuses on the areas of the financial statements
where there is potential for management to use their
judgement to influence the financial statements alongside the
potential to override the entity’s internal controls, related to
individual transactions.
We have therefore identified management override of
controls, in particular journals, management estimates and of
transactions outside the course of business as a significant
risk of material misstatement.
Group and the
Council
In response to the risk highlighted we carried out the following work:
• Documented our understanding of and evaluated the design effectiveness of
managements’ key controls over journals.
• Analysed the full journal listing for the year and used this to determine our
criteria for selecting high risk journals.
• Tested the high-risk journals we have identified.
• Gained an understanding of the critical judgements applied by management
in the preparation of the financial statements and considered their
reasonableness
• Gained an understanding of key accounting estimates made by management
and carried out substantive testing on in scope estimates.
• Evaluated the rational for any changes in accounting policies, estimates or
significant unusual transactions.
Conclusion
2025/26 was the first financial year in which the Council’s journal authorisation
control was fully implemented and operating effectively, with evidence
confirming that the control functioned as designed throughout the year. 
Our work did not identify any material issues in relation to management override
of controls.  We are satisfied from our work performed that there has been no
identified instances of management override of controls that would result in a
material misstatement of the financial statements.
Page 30

Page 31

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (3)
23
Significant risks identified in our Audit Plan Risk relates to Commentary
Valuation of land and buildings
In accordance with the CIPFA/LASAAC Code of Practice,
except for initial recognition, the Council is required to hold
property and property, plant and equipment (PPE) on a
valuation basis.  The valuation basis used will depend on the
nature and use of the assets.  Specialised land, buildings,
equipment, installations and fittings are held at depreciated
replacement costs (DRC), as a proxy for fair value. Non-
specialised land and buildings, such as offices, are held at
fair value. Council dwellings are determined using the basis of
existing use value for social housing.
As at 31 March 2026, the Council held land and buildings of
£428 million and council dwellings of £281 million. Given these
significant values, and the level of complexity and judgement
involved in their estimation process, there is an inherent risk of
material misstatement in the year end valuation of some
assets.  However, the risk is less prevalent in other assets as
these are generally held at depreciated historical cost, as a
proxy of fair value. We will therefore focus our audit attention
on assets that have large and unusual changes in valuations
compared to last year and/or unusual approaches to their
valuations. The risk will be pinpointed as part of our final
accounts work, once review the population of assets revalued.
Continued on next page.
Moray Council In response to the risk highlighted we carried out the following work:
• evaluated management’s processes and controls for the calculation of the
valuation estimates, the instructions issued to their valuer and the scope of
their work;
• evaluated the competence, capabilities and objectivity of the valuation
expert;
• reviewed the response from the valuer confirming the basis on which
valuations were carried out;
• challenged the information and assumptions used by the valuer to assess
completeness and consistency with our understanding;
• evaluated the valuer’s report to identify assets that have large and unusual
changes and/or approaches to the valuation – these assets were
substantially tested to ensure the valuations were reasonable;
• tested a selection of other asset revaluations made during the year to ensure
they had been input accurately into the Council's asset register, and the
revaluations had been correctly reflected in the financial statements;
• evaluated the assumptions made by management for any assets not revalued
during the year and how management had satisfied themselves that these
valuers were not materially different to current value and
• for any assets not formally revalued, evaluated the judgement made by
management or others in the determination of the current value of these
assets.
Continued on next page.
Page 31

Page 32

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (4)
24
Significant risks identified in our Audit Plan Risk relates to Commentary
Valuation of land and buildings (continued)
A substantial change has been made to the
Code of Audit Practice for 2025/26. Local
authorities are now required to complete a
full valuation for all properties once every
five years or alternatively on a five-year
rolling basis and supported by indexation in
intervening years. Note: Indexation does not
apply to the valuation of Council Dwellings
from 2025/26 onwards.
We have confirmed that the Council employ
an internal valuer to undertake a rolling
programme of valuations across their asset
base valuing land and buildings at least
once every five years. In the intervening
periods, Moray Council carries out an
indexation exercise.  For 2025/26, the
Council will utilise an external valuer to
carry out the valuations of Council
Dwellings.
We therefore consider this to be a
significant risk to our audit and a key audit
matter.
Moray Council Conclusion
Council Dwellings 2025/26 Valuation
Council Dwellings were subject to a full revaluation during 2025/26. Due to the timing of the
valuation, the updated valuation was unable to be included in the unaudited version of the
accounts approved by Full Council in June 2026. The Council received the valuation figures
from the Valuation Office Agency (VOA) in August 2026 and input the details into a second
version of unaudited accounts which were submitted for audit. This confirmed the valuation of
Council Dwellings at 31 March 2026 was £280.6 million. This was a decrease of £215 million from
the prior period closing balance of £495.6 million which disclosed in the 2024/25 accounts. 
Council Dwellings Prior Period Valuation
As a result of the significant fall in value in the 2025/26 valuation, we challenged management
about the basis of the previous full valuation which was carried out in 2020/21 and impacted the
2024/25 and prior year financials. The decrease in value was largely driven by an error in the
EUV-SH adjustment factor methodology used in the Council's 2020/21 internal valuation, which
failed to capitalise rental streams as required by applicable guidance. Therefore, the 2020/21
valuation had given an incorrect value for Council Dwellings which has continued to roll forward
in future years. This is due to Council Dwellings only being subject to full valuation once every
five years, meaning the full methodology was not assessed in intermittent years.
We confirmed this is prior period error rather than a change in estimation technique and
requested that the Council review the 2020/21 valuation using the applicable guidance.
The Council’s internal valuer provided relevant yield data for use in the valuation methodology,
enabling management to reconstruct the 2020/21 adjustment factors on the correct basis. The
audit team reviewed the updated valuation methodology and confirmed it was reasonable.
Page 32

Page 33

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (5)
25
Significant risks identified in our Audit Plan Risk relates to Commentary
Valuation of land and buildings (continued) Moray Council Conclusion (continued)
This resulted in the 2020/21 valuation being restated, with management rolling the updated
values through subsequent years to derive a restated opening balance at 1 April 2024. A
prior period adjustment was processed to the Council Dwellings opening and closing
balances in 2024/25. The Council have added a prior period adjustment note into the
accounts which confirms the restated 2024/25 closing balance for Council Dwellings is
£301.4 million, a decrease in the valuation of £194.1 million. This has been reported as an
adjusted error in Appendix A.
Other Land and Buildings
The 2025/26 Code of Practice on Local Authority Accounting introduced a significant
change to the accounting treatment of non-investment assets by permitting the use of
indexation in intervening years between full asset revaluations. We assessed the Council’s
application of indexation across the population of assets not revalued and confirmed the
approach was reasonable, with appropriate accounting entries made. Due to timings of
preparing the accounts, the Council used provisional index data for March 2026 in the
calculation of indexation for DRC assets. Our recalculation identified that were the final
index data used, the closing balance would have increased by £1.7 million. This has been
reported as an unadjusted error in Appendix A.
During our previous audits, we have encountered issues with the reconciliation processes in
place for the compilation of the PPE Note and an audit recommendation was raised as a
result. This issue re-occurred in 2025/26, and we confirmed that there were reconciling
differences between the PPE Note, the Fixed Asset Register, the indexation calculations and
the valuers report. It should be standard practice that the Council ensure the Fixed Asset
Register agrees to the financial statements and there should be a standard working paper
presented for audit that balances. We have rolled forward the recommendation raised in
the prior year audit at Appendix E.
Page 33

Page 34

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (6)
26
Significant risks identified in our Audit
Plan
Risk relates to Commentary
Valuation of land and buildings
(continued)
Moray Council Conclusion (continued)
We identified that the closing balance of Other Land and Buildings was overstated by £3.2
due to valuations in the valuers report not being correctly reflected in the Fixed Asset
Register. The Council have agreed to amend £2.3 million of the error in the current year, with
the remainder to be corrected next year. These have been reported as adjusted and
unadjusted misstatements in Appendix A. 
Other items
In the previous audit, we identified that the Council do not prepare a revaluation reserve
working paper which shows the balance held in the revaluation reserve and the movement on
the reserve during the year. While we were able to obtain the required revaluation reserve
information, the Council should prepare a separate working paper which shows all required
information. We raised a recommendation in the 2023/24 audit that the Council should
implement a revaluation reserve working paper, however this was not addressed during
2025/26. The recommendation remains valid, and our follow-up can be seen at Appendix
E.
Page 34

Page 35

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (7)
27
Significant risks identified in our Audit Plan Risk relates to Commentary
Defined benefit pension scheme valuation
The Council participates in the North East Scotland Pension
Fund (NESPF), a local government pension scheme.  There is
an established Pension Fund protocol in place with Pension
Fund auditors to provide external auditors with relevant
assurance.
The local government pension scheme is a defined benefit
pension scheme and in accordance with IAS 19: Employee
Benefits, Moray Council is required to recognise its share of
the scheme assets and liabilities in its Statement of Financial
Position.
In 2025/26, the Council applied the asset ceiling test as
prescribed by IFRIC 14 which limited the measurement of a
defined benefit asset to the ‘present value of economic
benefits available in the form of refunds from the plan or
reductions in future contributions to the plan.’ The pension
asset can be recognised as the lower of the net pension asset
or the present value of any economic benefits available. The
Council’s actuaries undertook this assessment and the asset
value in the accounts was reduced as the present value of the
benefits available were lower than the pension asset. The net
liability arising from the unfunded defined benefit obligation
remained as there is no right to offset this.
Continued on next page.
Moray Council In response to the risk highlighted we carried out the following work:
• evaluated management's processes and controls for the calculation of the
gross asset and gross liability and estimates, the instructions issued to the
actuarial expert and the scope of their work;
• evaluated the assumptions made by Hymans Robertson in the calculation of
the estimate, using work performed by an auditor’s expert commissioned on
behalf of Audit Scotland;
• evaluated the data used by management’s experts in the calculation of the
estimates;
• performed substantive analytical procedures over the gross assets, gross
liabilities and in year pension fund movements, investigating any deviations
from audit expectations;
• assessed the accuracy and completeness of the IAS 19 estimates and related
disclosures made within the Council’s financial statements; and
• reviewed management’s assessment of the application of IFRIC 14
• evaluated the response received from the NESPF auditor in line with the Audit
Scotland Protocol for Auditor Assurances for Local Government Pension
Schemes
Continued on next page.
Page 35

Page 36

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (8)
28
Significant risks identified in our Audit Plan Risk relates to Commentary
Defined benefit pension scheme valuation
The Council’s actuary, Hymans Robertson, provide an annual
IAS 19 actuarial valuation of Moray Council’s net liabilities in
the pension scheme.  There are a number of assumptions
contained within the valuation, including: discount rate;
future return on scheme assets; mortality rates; and future
salary projections.  Given the material value of the scheme’s
gross assets and gross liabilities and the level of  estimation in
the valuation, there is an inherent risk that the defined benefit
pension scheme net liability could be materially misstated
within the financial statements.  This risk is focussed on the
appropriateness and reasonableness of the underlying
assumptions adopted by the actuary and the suitability of
these for the Council.
We therefore consider this to be a significant risk to our audit
and a key audit matter.
Moray Council Conclusion
Our work has not identified any material issues in relation to the pension figures.
Our procedures included a review over the information the Council provided to
the actuary (and pension fund) on which the pension estimates were made.
Furthermore, as part of our IAS 19 assurance protocol request, the auditor of the
North East Scotland Pension Fund (NESPF) provided an evaluation of the design
of the controls related to the accuracy and completeness of source data
provided to the actuary, with no issues being raised.
Usually local government scheme (LGPS) pension liabilities calculated on an IAS
19 basis exceed any pension assets and members of the LGPS recognise a net
pension liability on their balance sheet. However, a net defined benefit asset
may arise where the defined benefit plan has been overfunded or where
actuarial gains have arisen.  This was the case for the Council, where the
pension assets currently exceed pension liabilities by £308.042 million. IFRIC 14
addresses the extent to which an IAS 19 surplus can be recognised on the
balance sheet and whether any additional liabilities are required in respect of
onerous funding commitments. IFRIC 14 limits the measurement of the defined
benefit asset to the 'present value of economic benefits available in the form of
refunds from the plan or reductions in future contributions to the plan.  The
pension asset can be recognised at the lower of the net pension asset or the
present value of any economic benefits available.
Continued on next page.
Page 36

Page 37

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (9)
29
Significant risks identified in our Audit Plan Risk relates to Commentary
Defined benefit pension scheme valuation (continued) Moray Council Conclusion (continued)
The Council requested an IFRIC14 assessment from the actuary as part of the
calculation of the pension figures in 2025/26, and the application of the asset
ceiling has reduced the pension asset to nil. The Council continue to have a
pension liability related to the unfunded elements of pensions which results in a
liability of £9.234 million being recognised on the Balance Sheet.
To prepare the unaudited accounts, the Council used an initial version of the
actuary report which was based on estimated data. Subsequently, the Council
received an updated version of the actuary report which resulted in some non-
material changes to the return of plan assets figure and the asset ceiling
calculation. The Council have amended the accounts so that it reflects the final
actuary report and this has been disclosed as an adjusted misstatement in
Appendix A. 
Page 37

Page 38

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (10)
30
Significant risks identified in our Audit Plan Risk relates to Commentary
Fraud in expenditure recognition
Due to the presumption that there are risks of fraud in
expenditure recognition, we are required to evaluate which
types of expenditure, expenditure transactions or assertions
give rise to such risks. Practice Note 10: Audit of Financial
Statements of Public Sector Bodies in the United Kingdom (PN10)
states:
"As most public bodies are net spending bodies, then the risk of
material misstatement due to fraud related to expenditure may
be greater than the risk of material misstatements due to fraud
related to revenue recognition".
(rebutted)
Moray Council Having considered the risk factors set out in ISA 240 and the nature of the
expenditure streams at the Council, we have determined that the risk of
fraud arising from expenditure recognition can be rebutted, because:
• there is limited incentive for management to manipulate the outturn
position as the Council maintains sufficient reserves to cover any
overspend.
• we consider payroll costs to be well forecast and are able to agree
these costs to underlying payroll systems. 
• non-payroll costs are generally high volume / low value transactions
which are recognised across a number of expenditure streams. This
would require a significant proportion of transactions to be
manipulated to result in a material error.
As such, we believe there is less opportunity for a material misstatement
as a result of fraud to occur in the recognition of expenditure.
Therefore, we do not consider this to be a significant risk for Moray
Council and the Group.
Conclusion
Our work has not identified any material issues in relation to completeness
of expenditure and associated liabilities.
Page 38

Page 39

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (11)
31
Significant risks identified in our Audit Plan Risk relates to Commentary
Fraud in revenue recognition
Under ISA (UK) 240 there is a rebuttable presumed risk that
revenue may be misstated due to the improper recognition of
revenue. This presumption can be rebutted if the auditor
concludes that there is no risk of material misstatement due to
fraud relating to revenue recognition.
(rebutted)
Group and the
Council
Having considered the risk factors set out in ISA240 and the nature of the
revenue streams at the Council and the Group, we have determined that the risk
of fraud arising from revenue recognition for all revenue streams can be rebutted
because:
• there is little incentive to manipulate revenue recognition.
• there is a low opportunity to manipulate other income since it is non-complex
and there are sufficient controls in place to prevent and detect fraud from
other income streams, we therefore believe that the risk of material fraud is
low.
Therefore, we do not consider this to be a significant risk for the Council and the
Group.
Conclusion
Our work has not identified any material issues in relation to revenue
recognition.
Page 39

Page 40

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other areas impacting the audit
32
Issue Commentary Conclusion
Nil net book value
assets
The Council’s asset
register includes
£10.463 million of
assets with a nil net
book value (NBV) that
are fully depreciated.  
There are two risks in relation to this issue:
• if these assets are no longer operational, the
gross cost and accumulated depreciation
balance will be overstated; and
• if these assets are operational, there is a risk that
the Council is not assigning appropriate asset
lives to its plant and equipment assets.
The potential impact of these risks is that the gross
cost and accumulated depreciation disclosed
Property, plant and equipment is overstated.
At 31 March 2026, there were 357 property, plant and equipment assets held on
the Fixed Asset Register at Nil NBV. These assets have a gross book value of £10.4
million. This is an increase in the total number of assets from the previous year;
however, the total gross book value of these assets has decreased.
We note that £5.850 million of the assets held at Nil NBV relate to the Dallachy
landfill site. The Council have a responsibility to maintain the site after it ceases
use and therefore it is correct that this continues to be held on the fixed asset
register beyond its useful life.
Across the remaining population, we carried out sample testing over assets that
continue to be held at Nil NBV, identifying two assets which management were
unable to confirm were still in use. However, due to the total population of the
remaining NBV assets being £4.55 million, there is no risk of material misstatement
within the gross book value of assets held by the Council. Furthermore, there is no
impact upon the balance sheet as the balances are held at nil.  Any impact of any
assets not held would be in the classification in the Property, Plant and Equipment
note only.
We raised a recommendation in our 2024/25 audit that an asset verification
exercise should be implemented as a business-as-usual activity. The Council have
a verification process in place and have confirmed that an accounting policy on
assets at nil value is being drafted and will cover all asset classes. This is due to be
in place for the 2026/27 financial year end. 
The previous recommendation will remain open until we confirm the policy is in
place.
Page 40

Page 41

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other areas impacting the audit (2)
33
Issue Commentary Conclusion
Nether Dallachy Landfill
Monitoring Obligation
The Council are required
to maintain a landfill site
at Nether Dallachy
following it being
decommissioned in May
2025
Landfill sites continue to pose an environmental risk long
after they stop accepting waste and are capped. This is due
to decomposing waste which generates methane and
leachate that can migrate into groundwater and
surrounding land if not properly managed.
Under the Pollution Prevention and Control (Scotland)
Regulations 2012 (formerly the Waste Management
Licensing Regulations), the Council remains legally
responsible for monitoring and managing these risks until
the Scottish Environmental Protection Agency (SEPA) is
satisfied the site no longer poses a pollution threat and
agrees to surrender the environmental permit. As this
obligation persists well beyond closure, the Council is
required to recognise a provision under IAS 37 for the
estimated future cost of aftercare and monitoring,
discounted to present value and reassessed annually.
Nether Dallachy landfill closed in May 2025, triggering an
ongoing obligation to monitor and maintain the site
(groundwater monitoring, leachate management, permit
fees and inspections) until it no longer poses an
environmental risk.
The Council included a contingent liability in the unaudited accounts
for Nether Dallachy, stating that an estimated value of any future
monitoring costs could not be reliably measured at the time of
preparing the accounts.
We challenged management on this conclusion, and requested that
they obtain further detail on the expected future costs of maintaining
the site and the duration of the monitoring period. This enabled
management to prepare an estimate of the expected costs of the
ongoing monitoring. Management have calculated an estimated cost
per annum for the ongoing maintenance of the site and have
discounted to present value. We have reviewed the calculation and
confirmed:
• the discount rate used in the estimation is appropriate
• the length of term used in the calculation is appropriate
• the expected annual costs of monitoring are reasonable.
This process has subsequently resulted in management recognising a
£6.040 million provision for Nether Dallachy (under IAS 16 and IFRIC 1
for decommissioning/restoration obligations) and the removal of the
contingent liability disclosure.
Page 41

Page 42

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Financial statements – key judgements and estimates
Assessment
 - We disagree with the estimation process or judgements that underpin the estimate and consider the estimate to be potentially materially misstated.
 - We consider the estimate is unlikely to be materially misstated however management’s estimation process contains assumptions we consider optimistic.
 - We consider the estimate is unlikely to be materially misstated however management’s estimation process contains assumptions we consider cautious.
 - We consider management’s process is appropriate and key assumptions are neither optimistic or cautious.
34
As required in the Council’s accounting policies, officers outline critical judgements in applying accounting policies and in addition, assumptions about the future
and other sources of estimation uncertainty. In particular, where estimates and judgements are identified, these should be quantified.
This section provides commentary on key estimates and judgments in line with the enhanced requirements for auditors.
Page 42

Page 43

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Financial statements – key judgements and estimates (3)
35
Significant
judgement or
estimate
Summary of management’s approach Audit comments Assessment
Property, Plant
and Equipment:
Depreciation
including useful
economic lives
(UEL) - £39.526
million
Note 15 outlines the Council’s approach to
depreciation.
Depreciation is provided for on all Property,
Plant and Equipment assets. An exception is
made for assets without a determinable
useful life (i.e., land and certain community
assets) and assets that are not yet available
for use (i.e., assets under construction).
Depreciation is calculated using the
straight-line method. In the year of
acquisition, a full year's depreciation is
provided for on all assets except for vehicles,
where the calculation is pro-rata based on
the month of acquisition.  In the year of
disposal, no depreciation is charged.
Where a material item of Property, Plant
and Equipment asset has major components
whose cost is significant in relation to the
total cost of the item, the components are
depreciated separately.
We examined the estimate, considering the:
• appropriateness of the underlying information, consistency of the
estimate and the adequacy of the disclosure of the estimate.
Conclusion
The first version of the unaudited accounts did not contain full
depreciation totals due to the Council Dwellings valuation being
delayed until August 2026. Once the Council received the updated
valuation figures, the depreciation figures were input into the updated
version of the accounts, which added £10.523 million to the
depreciation cost in the financial statements.
We were satisfied with the methodology for the calculation of the
depreciation charge. 
Note the findings on page 32 regarding the number of nil net book
value assets which the Council need to review in future years.
We consider
management’s process
is appropriate and key
assumptions are
neither optimistic or
cautious
Page 43

Page 44

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Financial statements – key judgements and estimates (4)
36
Significant
judgement or
estimate
Summary of management’s approach Audit comments Assessment
Provisions for
debt impairment -
£22.128 million
The Council is responsible for
calculating the allowance for impaired
debt based upon the latest information
about collectability of debt.
There is not a requirement in the CIPFA
Code to disclose the full amount of
impaired debt within the disclosures in
the debtors note.  The requirement is to
disclose the local taxation which forms
part of the total.
The local taxation element of the
allowance for impaired debt is £19.519
million as disclosed in Note 22.
We examined the estimate, considering the:
• appropriateness of the underlying information, consistency of the
estimate and the adequacy of the disclosure of the estimate.
Conclusion
We were satisfied with the methodology for the calculation of the
allowance.
We consider
management’s process is
appropriate and key
assumptions are neither
optimistic or cautious
Page 44

Page 45

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Financial statements – key judgements and estimates (5)
37
Significant
judgement or
estimate
Summary of management’s
approach
Audit comments Assessment
Public Private
Partnerships (PPP)
and similar
contracts
£97.858 million
Moray Council has a PPP for the
construction, maintenance and
operation of two schools in Keith
and Elgin.  There is also a design,
build, finance and maintain (DBFM)
scheme for a new school in Elgin.
These are accounted for under IRIC
12 Service Concession
Arrangements, as interpreted by the
FReM, as “on-balance sheet” by
Moray Council.
The accounting models are updated
annually to reflect actual charges
and RPI. Future years' service costs
are estimated based on the latest
actual charges and current RPI
rates. Interest and finance lease
liability charges are unaffected by
changes in RPI.
We reviewed your assessment of the estimate considering:
• review of key assumptions input into the accounting models;
• use of specialist software to gain assurance that the HUB model has
been appropriately updated for the period ended 31 March 2026;
• agreeing that accounting entries from the accounting model have been
accurately recorded in Moray Council’s accounts.
Conclusion
We identified that the Council's IFRS 16 transition adjustment processed in
2024/25 for both PPP schemes had been calculated incorrectly. Rather than
calculating the indexed portion of the unitary charge inflation and applying
it only to services and lifecycle (as required by IFRS 16), the Council has
applied a blended unitary charge inflation rate. This has meant that the
2024/25 transition adjustment was understated, which has resulted in the
2025/26 closing liability being overstated.
The Council have processed an amendment for the issue identified which
has resulted in the closing liability for PFI decreasing by £6.035 million to
£53.075 million. We are satisfied that the updated calculation and
disclosure of the public private partnerships and similar contracts is correct.
The financial statements at Note 41 disclose all the required information.
We consider
management’s process is
appropriate and key
assumptions are neither
optimistic or cautious
Page 45

Page 46

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Financial statements – key judgements and estimates (6)
38
Significant
judgement or
estimate
Summary of management’s approach Audit comments Assessment
Annual Leave
Accrual
£5.756 million
Moray Council accrues for annual leave
expenditure to ensure that all expenditure due to be
accrued in the financial year, not yet been taken
and effectively paid, is reflected within the financial
statements.
The Council base the estimate upon a sampled
approach of outstanding leave in each department
and extrapolate the findings across the whole
population.
We reviewed your assessment of the estimate considering:
• appropriateness of the underlying information, consistency of the
estimate and the adequacy of the disclosure of the estimate.
Conclusion
We were satisfied with the methodology for the calculation of the
annual leave accrual.
We consider
management’s
process is
appropriate and key
assumptions are
neither optimistic or
cautious.
Page 46

Page 47

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Financial statements – key judgements and estimates (7)
39
Significant judgement or
estimate
Summary of management’s
approach
Audit comments Assessment
Fair value of assets and
liabilities (financial
instruments
Financial assets:
£36.634 million
Financial liabilities:
£426.331 million
Financial liabilities and financial
assets represented by current and
long-term debtors and creditors
are carried in the Balance Sheet at
amortised cost.
We reviewed your assessment of the estimate considering:
• ISA (UK) 540 requirements; and
• appropriateness of the underlying information, consistency of the
estimate and the adequacy of the disclosure of the estimate.
Conclusion
We are satisfied with the methodology for the calculation of the
financial assets and liabilities.
We consider
management’s
process is
appropriate and key
assumptions are
neither optimistic or
cautious.
Page 47

Page 48

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Financial statements – key judgements and estimates (8)
40
Significant judgement
or estimate
Summary of management’s approach Audit comments Assessment
IFRS 16 right of use
Asset / Lease Liability:
Financial assets:
£99.454 million
Financial liabilities:
£59.274 million
The Council’s approach is set out in the accounting policies:
The Council applies IFRS 16 Leases in accordance with the
requirements of the Code of Practice on Local Authority
Accounting in the United Kingdom 2025/26. IFRS 16 requires the
majority of leases where the Council acts as lessee to be
recognised on the Balance Sheet as right-of-use assets and
corresponding lease liabilities. Lessor accounting remains
largely unchanged.
Under IFRS 16, the Council recognises a right-of-use asset and
a corresponding lease liability at the commencement of each
lease, except for leases that meet the exemption criteria. These
include short-term leases (with a term of 12 months or less) and
leases of low value assets (£6,000 or less). The Council has
elected to apply these recognition exemptions.
As a lessee, the Council previously classified leases as operating
or finance leases based on whether the lease transferred
substantially all of the risks and rewards incidental to ownership
of the underlying asset. Under IFRS 16, assets previously
classified as operating leases are now recognised as right-of-
use assets on the Balance Sheet, together with corresponding
lease liabilities.
Our testing over right of use assets and the lease
liabilities included a review over new lease
agreements entered into during 2025/26,
confirming it was appropriate these lease
arrangements were classified as right of use
assets.
Conclusion
We have not identified any material issues in
relation to our work performed in this area.
Our work performed during the year confirmed
that the five right of use assets which were
excluded in error in the previous year were
correctly included as right of use assets in the
2025/26 accounts.
We consider
management’s
process is
appropriate and key
assumptions are
neither optimistic or
cautious.
Page 48

Page 49

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other key elements of the financial statements
41
There were other key areas of focus during our audit. Whilst not considered a significant risk, these are areas of focus either in accordance with the Audit Scotland
Code of Audit Practice (2021) or ISAs or due to their complexity or importance to the user of the accounts:
Issue Commentary
Matters in relation to
fraud and
irregularity
It is the Council’s responsibility to establish arrangements to prevent and detect fraud and other irregularity.  As auditors, we obtain
reasonable assurance that the financial statements as a whole are free from material misstatement, whether due to fraud or error. We
obtain annual representation from officers and those charged with governance regarding the Council’s assessment of fraud risk,
including internal controls, and any known or suspected fraud or misstatement.   We have also made inquires of internal audit around
internal control, fraud risk and any known or suspected frauds in year.  We have not been made aware of any incidents in the period
and no issues in relation to these areas have been identified during the course of our audit procedures that are outside of the usual
expected investigations.
Accounting
practices
We have evaluated the appropriateness of Moray Council’s accounting policies, accounting estimates and financial statement
disclosures. We requested that the Council update their disclosures relating to the critical judgement in the valuation of PPE assets.
This now reflects the updated CIPA guidance which allows assets held at current value to be revalued on a rolling basis over a five-year
cycle, with annual indexation applied to assets where appropriate during the intervening years. The accounts also now disclose the
basis for all indices used in the application of indexation.
We have identified disclosure adjustments required to the financial statements which have been detailed in Appendix A.
Matters in relation to
related parties
The Council discloses its related party transactions at Note 37 of the accounts. We confirmed that the related party disclosure
included within the accounts were appropriate and are not aware of any other related parties or related party transactions which have
not been disclosed.
Matters in relation to
laws and regulations
We have not been made aware of any significant incidences of non-compliance with relevant laws and regulations and we have not
identified any incidences from our audit work. We have not identified any cases of money laundering or fraud at the Council.
Other information We are required to give an opinion on whether the other information published together with the audited financial statements (including
the Annual Report), is materially inconsistent with the financial statements or our knowledge obtained in the audit or otherwise appears
to be materially misstated. Minor amendments have been made to the Management Commentary, and we are satisfied that there are
no unadjusted material inconsistencies to report.
Page 49

Page 50

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other key elements of the financial statements (2)
42
Issue Commentary
Governance
statement
CIPFA and SOLACE updated the Delivering Good Governance in Local Government in May 2025 through an addendum to the 2016
Framework, introducing revised guidance on annual governance reviews and Annual Governance Statements for application from
2025/26 onwards.
The Council have not updated its Local Code of Corporate Governance to align with the revised CIPFA/SOLACE Delivering Good
Governance in Local Government guidance, which places greater emphasis on robust governance reviews, the use of assurance
evidence, and a forward-looking assessment of governance arrangements. We recommend that the Council incorporate the
requirements and expectations of the revised CIPFA/SOLACE guidance, ensuring that governance arrangements remain current,
effective and fully aligned with the requirements applicable from 2025/26 onwards. We have included a recommendation at Appendix
B.
We are required to report on whether the information given in the Annual Governance Statement is consistent with the financial
statements and prepared in accordance with the Delivering Good Governance in Local Government: Framework (2016). We identified
that the Council had not included all required information in line with framework. The Council subsequently amended the Annual
Governance Statement to ensure it included all the required detail outlined in the framework. 
No inconsistencies have been identified; we plan to issue an unmodified opinion in this respect.
Matters on which we
report by exception
We are required by the Accounts Commission to report to you if, in our opinion:  adequate accounting records have not been kept; or
the financial statements and the audited part of the Remuneration Report are not in agreement with the accounting records; or we
have not received all the information and explanations we require for our audit or there has been a failure to achieve a prescribed
financial objective. We have nothing to report in respect of these matters.
Written
representations
A letter of representation has been requested from the Council as required by auditing standards. The unadjusted misstatements at
Appendix A will be appended to the letter of representation
Page 50

Page 51

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other responsibilities under the Code
43
Issue Commentary
Going concern In performing our work on going concern, we have had reference to Statement of Recommended Practice – Practice Note 10: Audit of
financial statements of public sector bodies in the United Kingdom (Revised 2022). The Financial Reporting Council recognises that for
particular sectors, it may be necessary to clarify how auditing standards are applied to an entity in a manner that is relevant and
provides useful information to the users of financial statements in that sector. Practice Note 10 provides that clarification for audits of
public sector bodies.
Practice Note 10 states that if the financial reporting framework provides for the adoption of the going concern basis of accounting on
the basis of the anticipated continuation of the provision of a service in the future, the auditor applies the continued provision of
service approach set out in Practice Note 10. The financial reporting framework adopted by the Council meets this criteria, and so we
have applied the continued provision of service approach. 
In accordance with Audit Scotland guidance: Going concern in the public sector, we have therefore considered management’s (senior
officer’s) assessment of the appropriateness of the going concern basis of accounting and conclude that:
• a material uncertainty related to going concern has not been identified
• management’s (senior officer’s) use of the going concern basis of accounting in the preparation of the financial statements is
appropriate.
National fraud
initiative
The National Fraud Initiative (NFI) in Scotland is a biennial counter-fraud exercise led by Audit Scotland, and overseen by the Cabinet
Office for the UK as a whole. It uses computerised techniques to compare information about individuals held by different public bodies,
and on different financial systems that might suggest the existence of fraud or error. Participating bodies, including Moray Council,
receive matches for investigation. 
The Council has put processes and arrangements in place to investigate matches and appropriate personnel are involved in the process. 
The Council received their NFI matches for the 2024/25 exercise in December 2024. The total number of matches identified for
investigation was 3,322.
The Council have followed these up during 2025 and cleared 1,083 of the matches. The Council identified 27 errors during the review,
however this did not require the recovery of any funds. The Council also identified co-estimated savings of £21,438 from the process.
The next NFI exercise is scheduled for 2026/27 and the Council expect to receive the matches for investigation towards the end of 2026.
Page 51

Page 52

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other responsibilities under the Code (2)
44
Issue Commentary
WGA Return For local government audits we are required to complete Whole of Government Accounts (WGA) work and provide an assurance
statement on Moray Council’s WGA return as mandated by National Audit Office.  The audit guidance outlines that the deadline for
submission of data is 29 August 2026 however this was not be met by the Council.  Based upon previous years, it is not expected that
Moray Council would exceed Audit Scotland’s prescribed testing threshold.  We will complete the relevant specified procedures and
prepare and submit a partial assurance statement once we have completed all our work on your financial statements, and when the
final guidance is received.
Other returns to
Audit Scotland
In accordance with the Audit Scotland Planning Guidance, as appointed auditors we have prepared and submitted Fraud Returns and
Current Issues Returns to Audit Scotland, sector annual reports, shared intelligence on health and social care, sector meetings and
Technical Guidance Notes.  There is nothing we need to bring to your attention in this respect.
Grants In accordance with Audit Scotland planning guidance, as appointed auditors we undertake grant certification work on behalf of the
Council.  For 2025/26 we are required to provide the following certifications:
• National Non-Domestic Rates Income Return (NDR) and
• Housing Benefit certification
We anticipate that our work on the grant claims will be concluded by the 30 November 2026 deadline for Housing benefits, with work
starting in September 2026. We anticipate work on NDR will be complete by the 8 October 2026, with work carried out in September
2026.
Page 52

Page 53

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other responsibilities under the Code (3)
45
Issue Commentary
Section 106
Charities
The 2006 Regulations require charities to prepare Annual Accounts and require an accompanying auditor’s report where any legislation
requires an audit. The Local Government (Scotland) Act 1973 specifies the audit requirements for any trust fund where some or all members of
a council are the sole trustees. Therefore, a full and separate audit and independent auditor’s report is required for each registered charity
where members of the council are sole trustees, irrespective of the size of the charity.
Our audit appointment as the Council’s auditor includes the audit of any trust funds falling within Section 106 of the Local Government
((Scotland) Act 1973 that are registered charities.  For Moray Council we have therefore been appointed as auditors of the connected
charitable trust funds. The Council acts as sole trustee for eight Connected Charity Trust Funds listed below which have charitable status and
are registered with the Office of the Scottish Charity Regulator (OSCR):
• Moray and Nairn Educational Trust
• Keith Poor Householders Fund (Keith Nursing Trust Fund)
• Castlehill Trust
• Grant Park Trust
• George Boyd Anderson Bequest
• Mr & Mrs William J Watt Dufftown Food Fund
• Robert Young Trust
• The Moray Council Charitable Trust
Due to the number of transactions in the Connected Charity we carry out 100% verification.  There are no matters arising that we need to
bring to your attention.  The financial statements were presented on time, to a good quality level with referenced supported working papers.
Work is complete, and we anticipate issuing an unmodified opinion after approval expected at the Council meeting on 30 September 2026.
We did not require any additional representation in the Letter of Representation for the Charity.
The audit fee for this work is outside of the main fee and is £7,500, which is the same fee as set out in our Audit Plan presented to the ASC
meeting in March 2026.
Page 53

Page 54

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other findings – other matters
46
Other Matter Commentary Conclusion
Infrastructure
Assets
In accordance with the temporary relief offered by Local Government Circular
09/2022 Statutory Override Accounting for Infrastructure Assets, and extended
by Finance circular 8/2024, the 2025/26 accounts did not include disclosure of
gross cost and accumulated depreciation for infrastructure assets. This is due to
historical reporting practices and resultant information deficits meaning the asset
position would not be accurately presented in the financial statements.
The Statutory Override is temporary, and whilst it will continue to apply in
2026/27, the Council need to ensure their records are up-to-date and in a
position where they could disclose the correct information in the accounts if
required.
Note: The statutory override has been extended in Scotland until 31 March 2027. 
We have previously raised a recommendation that the Council should review their
accounting for Infrastructure Assets, on the expectation the override would end in
2024/25. Whilst this is no longer the case, the recommendation raised remains
valid and the Council must ensure it has adequate processes in place to account
for its Infrastructure Assets when the statutory override is no longer in place.
Whilst there will be no requirement to include this
information in the 2026/27 accounts, as part of the look
ahead process, the Council must ensure it has adequate
processes in place to account for its Infrastructure Assets
when the statutory override is no longer in place.
Control
deficiencies
Our audit work has identified the following control deficiencies:
• The code of conduct policies have not been updated for several years, creating
a risk that they are no longer fit for purpose
• The declarations of interests for several councillors are out of date, with some
not reviewed since 2022, resulting in a number of undisclosed interests. This
increases the risk of conflicts of interest not being identified or managed
appropriately. Management should ensure declarations are regularly reviewed
and updated.
The Council should strengthen its governance
arrangements by reviewing and updating its code of
conduct policies and implementing robust processes to
ensure declarations of interests are regularly reviewed and
kept up to date. This will help ensure policies remain fit for
purpose, promote transparency, and support the effective
identification and management of potential conflicts of
interest.
Page 54

Page 55

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other findings – information technology
Assessment
 - Significant deficiencies identified in IT controls relevant to the audit of the financial statements.
 - Non-significant deficiencies identified in IT controls relevant to the audit of the financial statements / significant deficiencies identified with sufficient mitigation of risk.
 - IT controls relevant to the audit of financials statements judged to be effective at the level of testing in scope.
 - Not in scope for testing
47
This section provides an overview of results from our assessment of Information Technology (IT) environment and controls which included identifying risks from the use
of IT related to business process controls relevant to the financial audit. This includes an overall IT General Control (ITGC) rating per IT system and details of the
ratings assigned to individual control areas.
IT application Level of assessment performed Overall ITGC
rating
ITGC control area
rating – security
management
ITGC control area
rating – technology
acquisition,
development and
maintenance
ITGC control area
rating – technology
infrastructure
Related significant risks /
other risks
General ledger ITGC design, implementation and
operating effectiveness.

Green

Green

Green

Green All significant risks
Payroll ITCG design and implementation
effectiveness only.

Green

Green

Green

Green N/A
Fixed Assets ITCG design and implementation
effectiveness only.

Green

Green

Green

Green
Property, Plant and
Equipment
Non-Domestic
Rates and
Council Tax
ITCG design and implementation
effectiveness only.

Green

Green

Green

Green N/A
Page 55

Page 56

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other findings – information technology (2)
48
IT control deficiencies
As part of our audit work, we obtained an understanding of the IT environment related to all key business processes, identified any risks from the use of IT relevant to
our audit and assessed the relevant ITGCs in place to mitigate these risks. We reviewed all four IT systems referred to on the previous page.
We have identified control deficiencies in the general ledger and non-domestic rates/council tax systems. We have provided details of these issues and our
recommendations on how these issues could be resolved.  The Council provided a response to each recommendation and assigned an action owner and timeline for
the issues to be addressed.
The Council have confirmed they will take further action to address each control recommendation made and we will follow-up the recommendations made as part of
next year’s audit planning work. 
Page 56

Page 57

Wider scope and best value
conclusions
04
Page 57

Page 58

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope and best value arrangements
Our responsibilities under the Code extend beyond the audit of the financial statements. The Code sets out four audit areas that frame wider scope into specified
reporting criteria. These are as set out below:
50
Financial management
Has the body got sound
budgetary process, financial
capacity and the control
environment and internal
controls are operating
effectively.
Financial Sustainability
How the body looks forward to
the medium and longer term to
consider whether the body is
planning effectively to deliver
its services or the way in which
they should be delivered.
Vision, Leadership and
Governance
How effective are the body’s
scrutiny and governance
arrangements, leadership and
decision making, and
transparent reporting of
financial and performance
information.
Use of Resources to Improve
Outcomes
How the body makes best use
of their resources to meet
stated outcomes and
improvement objectives,
through effective planning and
working with strategic partners
and communities. This includes
demonstrating economy,
efficiency and effectiveness
through the use of financial
and other resources and
reporting performance against
outcomes.
Page 58

Page 59

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope conclusions
This section of our report documents our conclusions from audit work on the wider scope areas set out in the Code. We take a risk-based audit approach to wider scope work. Within our
audit plan we identified one significant risk in respect of financial sustainability.
Wider scope
area
Our risk considerations and focus Significant risk
identified - final stage
Wider scope conclusion
Financial
Management
The arrangements in place at the
Council to ensure sound financial
management, accountability and
the arrangements to prevent and
detect fraud, error and other
irregularities
No
The Council delivered the 2025/26 budget through effective monitoring and reporting of its
finances, resulting in a final overspend against budget of £0.230 million. The Council are yet to
achieve the Scottish Government target that 1% of a local authority’s budget is allocated via
Participatory Budgeting.  The Council made significant amendments to the Capital Plan during
2025/26 due to re-profiling of capital expenditure into future years. Whilst we recognise external
factors can impact planned timelines, the Council must ensure that the capital budget set at the
start of the year is realistic, which will avoid significant re-profiling of budget during the year.
Financial
Sustainability
The projected financial position of
the Council in the medium to longer
term and the relevance and
appropriateness of assumptions
applied to financial plans that will
allow the council to effectively
deliver services in the future
Yes
The Council approved the 2026/27 revenue budget without using any general reserves, supported
by savings plans of £4.446 million. Current forecasts indicate that while majority of savings planned
will be achieved, a few are unlikely to be realised, meaning continued effective monitoring,
reporting and cost focus will be required to deliver a balanced outturn. Looking ahead, the Council
need to identify a further £8.185 million of savings up to financial year 2028/29.   The Council’s
Medium to Long Term Financial Strategy confirms that significant savings will be required to bridge
the projected funding deficit over the longer term and the Council must identify ways to alleviate
the significant budget gap over the life of the strategy.
Vision,
Leadership and
Governance
The effectiveness of the Council’s
governance arrangements and the
arrangements in place to deliver
the vision, strategy and priorities
set by the council
No
The Council have implemented changes to the management structure and recruited into key posts
within the new structure. The next phase of the restructure programme will focus on cultural change
across the Council. Addressing recruitment challenges will be key to achieving the long-term
objectives of the restructure. The Council has made improvements to its governance arrangements
and suitable arrangements are in place. The Council have implemented self-evaluation, with a
process in place to ensure all services are considered on an ongoing basis.
Use of
Resources to
Improve
Outcomes
How the Council demonstrates
economy, efficiency and
effectiveness through its use of
financial and other resources
No
The Council has appropriate arrangements to report outcomes against Council priorities. Overall
LGBF performance has been relatively static across the previous twelve months, but there has been
a general decline in recent years, with less indicators in the top two quartiles of LGBF performance
data than in previous years. The Council’s own internal performance indicators show mixed overall
performance, with some indicators showing improvement, but others declining overall performance.
 No risks identified
 Other risks identified.
 Significant risk identified.
Page 59

Page 60

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial management
52
Wider scope area Wider scope audit response and findings Conclusion
Financial
management
No risk identified.
2025/26 Financial Performance - Revenue
The Council approved the revenue budget for 2025/26 and the financial plan for 2025-2028 at the Council
meeting on 26 February 2025. This was the first time in several years the Council presented a balanced budget
without the planned use of any general reserves. The Council also set indicative budgets for 2026/27 and
2027/28 as part of the budget approval.
The Council approved revenue expenditure of £302.085 million and confirmed funding of £294.196 million,
resulting in a savings requirement of £7.889 million. All savings requirements for 2025/26 were approved by
members as part of the budget setting process.
Throughout the year, the budget and projected outturn have been reported to Members and updated for
known changes. The changes to the budget during the year are reflected in the table below:
The details of over and underspends against the quarterly budget are set out in the financial monitoring
reports, with details on budget movements provided across two appendices to the monitoring report. These
appendices set out budget movements, changes in provisions, details on changes in savings and any additional
costs, with cross references to the Committee/Council meeting where the change in budget was approved. We
have noted that appendix three is now produced as part of the final outturn reporting, confirming the changes
in budget for the last quarter of the financial year.
2025/26 budget processes
followed appropriate
governance processes.
Budget monitoring
throughout the year showed
that the Council's budgets
were accurate, with actual
spend in line with the
projected outturn reported
during 2025/26.
Quarter 1
(£m)
Quarter 2
(£m)
Quarter 3
(£m)
Quarter 4
(£m)
Actual (£m)
General Services Expenditure 296,443 299,804 300,387 302,277 302,507
Page 60

Page 61

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial management (2)
53
Wider scope area Wider scope audit response and findings Conclusion
Financial
management
(continued)
The table below shows the Council’s outturn position for 2025/26. The Council had total expenditure of £302.507
million against a final budget of £302.277 million, resulting in an overspend against budget of £0.230 million,
equivalent to a 0.08% variance. The Council were transparent about the financial position throughout the year and
delivered the budget through effective monitoring and reporting of its finances.
The Council delivered an
overspend of £0.230
million against its
2025/26 revised budget.
The Council have utilised
some earmarked
reserves balances during
2025/26 and this was
included within the
revised budget.
2025/26 Financial Outturn Initial Budget (£m) Revised Budget (£m) Actual (£m)
Departmental expenditure 265.988 277.220 275.385
Loans Fund expenditure 17.207 24.660 24.519
Additional provisions 11.002 £0.397 -
Transfer to earmarked reserves - - 2.603
Total expenditure 294.197 £302.277 £302.507
Scottish Government Grant
income (236.877) (£241.125) (£241.191)
Council Tax income (57.320) (£57.470) (£57.148)
Total income (294.197) (£298.595) (£298.339)
Use of earmarked reserves (£3.682) (£4.168)
Total income including
reserves (£302.277) (£302.507)
Page 61

Page 62

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial management (3)
54
Wider scope area Wider scope audit response and findings Conclusion
Financial
management
(continued)
On the 15 April 2025, the Council approved a management restructure, which resulted in service budgets being realigned
to new Executive Director and portfolio groupings. As a result, the report formatting for revenue monitoring updates was
adjusted during 2025/26. From quarter 4 onwards, the financial monitoring reports have been presented in accordance
with the new structure to ensure consistency between operational and financial reporting. The Council have been
transparent in the reasoning for the change and there is clear cross over between the old structure and new structure.
Financial Performance - Savings
To balance the 2025/26 budget, recurring savings of £7.889 million were approved at the time of budget setting.  As the
year progressed, amendments were made to the total savings requirement, with details of these changes presented as
part of the revenue monitoring reports.  Overall, the final approved savings for 2025/26 totalled £7.102 million.
The year-end outturn report, presented to Council on 30 June 2026, provides an overview on the savings delivered during
2025/26:
Achieved savings during 2025/26 totalled £5.361 million, of which £5.183 million were deemed to be recurring in nature.
The year-end outturn report provides a breakdown of each individual saving across services. This level of reporting can
also be seen during the year, with a breakdown of savings progress presented as part of the revenue monitoring reports
presented to Council. Throughout 2025/26, the Council were transparent in the reporting of savings progress, and made
it clear that all savings would not be delivered during the year. The year-end savings analysis provides a succinct
overview of the Council’s overall delivery of each saving during the year.
The Council delivered
a significant portion
of planned savings,
but not the full target.
The reporting to
members during the
year made it clear
that all planned
savings would not be
delivered, with reports
confirming the
alternative options
that were being
utilised by
management.
Actual (£m)
Savings Delivered (Green) 5.361
Savings Deferred (Amber) 0.334
Savings Not Delivered (Red) 1.407
Total 7.102
Page 62

Page 63

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial management (4)
55
Wider scope area Wider scope audit response and findings Conclusion
Financial
management
(continued)
Financial performance – Capital
The Council approved the Capital Plan for 2025/26 on 21 January 2025. This is the first year the Council have
prepared a three-year capital budget, following feedback from budget managers that a single year capital plan
was too restrictive and created a reluctance to commit to preliminary spend. The change to three-year planning is
aimed at providing more certainty to budget managers in terms of multi-year funding, and more realistic spend
profiles.
The Council initially approved a 2025/26 Capital Plan of £64.045 million. Following approval, the capital budget
increased to £73.336 million as a result of carry-forward budgets from 2024/25. A further review in August 2025 led
to a significant re-profiling of expenditure associated with the Moray Growth Deal and Levelling Up Fund, resulting
in a £22.280 million reduction and a revised capital budget of £51.056 million, which was approved by the Corporate
Committee in August 2025. Minor amendments to budget were made thereafter, and the final approved budget
totalled £50.564 million.
The capital monitoring position has been reported to members on three separate occasions during 2025/26 to date.
The position reported to members is reflected in Table 1 below:
The final year-end actual outturn was £32.596 million, an underspend of £17.968 million compared to the amended
capital plan at 31 December 2025.  This represented a delivery rate of 65% of the amended capital plan.
The Council made
significant
amendments to the
Capital Plan during
2025/26 due to re-
profiling of capital
expenditure to future
years.
The change to a three-
year approach to
budgeting is a positive
step.
Budget – Including
carry forwards
£m
30 June        
2025
£m
31 September
2025
£m
31 December
2025
£m
31 March
2026     
£m
Capital Plan – Agreed
Budget £73.336 51.056 51.056 50.564 50.564
Capital Plan –
Planned Expenditure - 51.030 46.995 37.730 32.596
Variance - 0.026 4.061 12.834 17.968
Page 63

Page 64

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial management (5)
56
Wider scope
area
Wider scope audit response and findings Conclusion
Financial
management
(continued)
Financial performance – capital (continued)
Changes to the capital plan during the year reduced the Council's borrowing requirement from £19.437 million in the
original Capital Plan to £11.907 million at year-end. The year-end outturn report identified project scope changes, staffing
constraints, supply chain issues and third-party dependencies as the main causes of capital slippage. The Council see
three-year planning as the mechanism to reduce the significant level of slippage in capital but acknowledge this will take
time. We will continue to monitor delivery of the capital programme in future years and our previous recommendation raised
on capital slippage remains valid.
The Council have a history of re-profiling capital expenditure during the financial year due to capital plans being overly
ambitious at the start of the year. The table below shows a comparison between the approved capital plan and the year-
end capital outturn in recent years.
The Council have
continued to
experience significant
levels of capital
slippage during
2025/26 and must
ensure that the
capital budget
agreed in advance of
the financial year is
realistic.
Budgeted Capital Expenditure                               
£m
Actual Capital Expenditure
£m
2022/23 51.430 28.360
2023/24 59.200 30.270
2024/25 49.662 27.219
2025/26 64.045 32.596
Page 64

Page 65

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial management (6)
57
Wider scope area Wider scope audit response and findings Conclusion
Financial
management
(continued)
Financial Management Arrangements
The Council has a suite of financial monitoring reports that are presented to Members throughout the year. The outturn
against the revenue budget is reported on a quarterly basis, with a final outturn report delivered following the end of the
financial year.  All in-year financial information is reported on a regular and timely basis and there several supporting
appendices to the monitoring reports which provide detail on a service level basis, changes made to budget during the
year and progress against the savings delivery plans.
We have previously reported that the Council has experienced issues in recruiting finance staff. The Council continues to
carry vacancies within the finance team, which places additional pressure on existing resources and reduces the
capacity within the service. During the audit, the finance team experienced shortages due to staff absence which led to
some delays in audit evidence being received.  The Council should continue its recruitment efforts to ensure the finance
team has adequate resource. This will be achieved through the creation of two new senior assistant posts, and the
recruitment of a new Senior Accountant which is ongoing.
Participatory Budgeting
The Scottish Government have a set target that 1% of a local authority’s budget should be allocated via Participatory
Budgeting. As part of its key performance reporting, the Council have set a target to achieve 100% of the Scottish
Government target. For 2025/26, the Council has reported that 38.5% of the target has been achieved. Whilst this is
significantly below target, it is an improvement in performance compared to the previous year, when 13.8% was
achieved.
The Council have confirmed that the Moray Engage has been launched and used for consultation and work is underway
to review all areas of engagement and consultation that Moray Council lead on. The Council are aiming to develop a
Community Consultation and Engagement Strategy which will lay the foundations for moving forward with the 1%
Participatory Budgeting target. The Council are also forming an officer group which will aim to progress the delivery of
the seven pillars of the Participatory Budgeting Charter. As a result, our previous audit recommendation on achieving
this target remains valid and the Council are undertaking work to ensure key stakeholders including partners and
individuals are involved in the participatory budgeting exercise.
The Council are actively
recruiting finance staff
to add capacity within
the finance team.
The Council have not
yet achieved the
Scottish Government
target that 1% of a local
authority’s budget
should be allocated via
Participatory
Budgeting. 
Page 65

Page 66

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability
58
Wider scope area Wider scope audit response and findings Conclusion
Financial
sustainability
Significant risk: The
Council continue to
face significant
financial pressures.
Efficiency savings
totalling £14.700
million are required in
2026/27 – 2028/29 to
achieve financial
balance. £8.185
million of these
savings need to be
identified.
Short Term Financial Planning – Budget Setting 2026/27
The 2026/27 budget was approved by the Council on 26 February 2026.  The Council set a balanced budget,
with the only planned use of earmarked reserves for investment activities related to the Transformation
Strategy. The Council also set indicative budgets for 2027/28 and 2028/29 as part of the budget approval.
The Council approved revenue expenditure of £316.123 million and have confirmed funding of £311.677 million,
resulting in a savings requirement of £4.446 million. All savings requirements for 2026/27 have been approved
by members as part of the budget setting process.  The table below outlines the cumulative funding gap over
the three-year period:
To achieve financial balance, efficiency savings totalling £14.700 million are required over the next three
years (2026/27 – 2028/29). As part of the budget setting process, the Council have approved £4.446 million
of savings for 2026/27 and £2.069 million for financial years 2027/28 and 2028/29. The Council aim to
identify the remaining savings for 2027/28 and 2028/29 to ensure balanced budgets can continue to be
achieved going forward.
The vast majority (97%) of the agreed savings are recurring in nature.
The Council agreed the
2026/27 budget without
the planned use of any
general reserve balances
to balance the budget.
2026/27    
£m
2027/28     
£m
2028/29    
£m
Planned revenue expenditure 316.123 321.479 332.485
Planned revenue funding (311.677) (318.579) (325.131)
Savings required (4.446) (2.900) (7.354)
Savings agreed 4.446 1.764 0.305
Page 66

Page 67

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability (2)
59
Wider scope
area
Wider scope audit response and findings Conclusion
Financial
sustainability
(continued)
Short Term Financial Planning – Budget Monitoring 2026/27
The Council presented the Quarter 1 revenue monitoring report to the Corporate Committee on 25 August
2026. The report provides an update on the Council’s performance against the 2026/27 budget. The report
also confirms movements in the total budget position and confirms the revised budget for 2026/27 is £314.745
million, an increase of £3.068 million from the approved budget.
The budget position at the end of June 2026 is an overspend against budget to date of £2.299 million.
Approximately 74% of the overspend relates to services provided by the Moray Integration Joint Board (IJB),
totalling £1.707 million. The Council has made net provision in its budget of £4.300m to cover an element of
Moray IJB overspend, made up of £0.900 million passported to the service and £3.400m held as a central
provision. The current projected overspend is within that parameter.
As outlined previously, savings of £4.446 million were approved when the budget was set. The monitoring
report provides an update on progress towards achievement of savings and outlines:
• £0.168 million of savings are assessed as red and are highly unlikely to be achieved
• A number of other savings are currently assessed as amber as they are dependent on implementation later
in the financial year or are subject to expenditure profiling.
Whilst the Council has identified other in year savings, such as insurance premium reductions, if projected
overspends within the IJB continue to arise, the Council may need to utilise existing general reserves balances
to fund any overspends at year end. As such, the Council should aim to identify further savings options which
will enable it to achieve financial balance in 2026/27, to avoid the use of finite reserves balances.
The Council may not deliver all
required savings in 2026/27 and
if possible, they should look for
alternative options to help
achieve a balanced budget.
The projected overspends noted
in the report, including those
relating to the IJB, places
additional financial pressure on
the Council and increases the
risk of needing to identify further
savings to mitigate overspends.
Page 67

Page 68

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability (3)
60
Wider scope area Wider scope audit response and findings Conclusion
Financial
sustainability
(continued)
Medium to Long Term Financial Strategy
The Medium to Long Term Financial Strategy (MTLFS) was approved by Council on 25 February 2026 and
incorporates the most recent economic and fiscal forecasts from the Scottish Fiscal Commission (SFC) and
Office for Budget Responsibility (OBR).
The MTLFS includes a scenario analysis which indicates the areas of pressure for the Council should certain
scenarios develop over time. Below, we have detailed the mid-range assumptions reflected in the MTLFS should
these materialise. This is reflected in the table below:
The MTLFS confirms the Council’s overall budget gap to financial year 2035/36 is projected to be £61.410
million. This reflects the wider financial sustainability risk to the Council and the need to continue to identify
new ways to deliver services via approaches to transformation.
We note that the MTLFS includes a 10% increase in Council Tax for 2026/27 (subsequently approved) and a 6%
increase for 2027/28. However, the current funding gap for 2028/29 has not assumed any increase in Council
Tax. Were the Council to approve an increase in Council Tax rates for 2028/29, this would lower the expected
funding gap.
The council is using
transformation to assess and
identify new and innovative
ways to alleviate the
significant budget gap
identified over the life of the
MTLFS. 
As funding pressures continue
and opportunities for
efficiencies become more
limited, delivering sustainable
savings and transformational
change will become
increasingly important to
secure the Council's long-
term financial sustainability.
The Council’s scenario
analysis contains a wide
range of factors that could
impact the financial
sustainability of the Council
in the long term.
2026/27 2027/28 2028/29 2029/30–
2035/36
Total
Total Additional Income (£6.630m) (£4.740m) (£2.980m) (£24.510m) (£38.860m)
Total Additional Expenditure £9.220m £9.720m £12.690m £68.640m £100.270m
Budget Gap £2.590m £4.980m £9.710m £44.130m £61.410m
Page 68

Page 69

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability (4)
61
Wider scope area Wider scope audit response and findings Conclusion
Financial
sustainability
(continued)
Reserves
Historically, the Council has relied on general reserves balances to balance the budget, which was not sustainable
in the longer term. At the end of 2025/26, the Council held general fund reserves totalling £27.604 million, with
£21.604 million earmarked for specific purposes. The Council’s updated reserves policy, which was approved by
Council in September 2024, is to hold £6 million as free general reserves.
The Council have not utilised any general reserves balances during 2025/26 to balance the budget. The only
reserves balances utilised during the year related to earmarked reserves for specific projects. 
We have previously reported that the Council must ensure that transformation is the key driver for addressing
identified budget gaps over the longer term and the Council should not revert to the use of general reserves as the
method of balancing the budget. The MTLFS includes a section on the Transformation Strategy, with specific
reference made to individual projects, which the Council see as the primary long-term lever for achieving financial
sustainability. We note that there is no planned use of general reserves as part of the 2026/27 budget or the
MTLFS.
The Council have set a
balanced budget for
2026/27 without the
planned use of general
reserves balances.
Furthermore, there is no
planned use of general
reserves outlined in the
MTLFS.
Page 69

Page 70

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability (5)
62
Wider scope area Wider scope audit response and findings Conclusion
Financial
sustainability
(continued)
Capital and Long-Term Borrowing
The Council approved the Capital Plan for 2026/27 – 2028/29 at the Council meeting held on 28 January 2026. 
The Council also approved an indicative 10-year Capital Plan at the same meeting.
Total funding required over the life of the three-year plan is projected to be £221.607 million. Approximately 67% of
the three-year capital programme is expected to be funded by borrowing, with the remaining 33% from grants
and other receipts.
The Council have an approved a methodology for keeping capital expenditure within affordable limits (known as
the cap). The Council established an affordability ceiling of 10%, in line with CIPFA guidance, and have considered
the cap in producing the 2026/27 – 2028/29 Capital Plan. This ensures the Council’s capital plan is affordable.
The Council also approved the indicative ten-year Capital plan at the meeting in January 2026. The total planned
expenditure over the ten-year period is £427.600 million and the Council has projected that total anticipated
borrowing over the length of the plan will be £253.380 million. This means that borrowing will finance 59.3% of the
plan over the ten-year period. The anticipated borrowing significantly reduces over the later years of the plan,
with 58.6% of borrowing (£146.611million) expected in first three years of the 10-year plan.
The Council’s Capital
Plan requires a
significant level of
borrowing in the early
years of the plan.
The Council has
considered the
affordability cap as part
of the capital budget
setting.
Page 70

Page 71

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (1)
63
Wider scope area Wider scope audit response and findings Conclusion
Vision, leadership
and governance
No risk identified.
Council Governance
During 2025, the Council undertook a review of its corporate management structure to strengthen capacity in key
areas. This is intended to support the delivery of the Council’s strategic priorities and help secure a sustainable
financial position for the future.  The new management structure went live on 1 September 2025.
Within the new structure, there are three Executive Directors, plus the Chief Officer of the Moray Integration Joint
Board, who report directly to the Chief Executive.  The new management structure is detailed on the Council’s
website and includes the remit and team members for each Executive Director.  The new structure is outlined below:
• Chief Executive
• Executive Director Finance, Strategy & Transformation
• Executive Director Education, Housing & Communities
• Executive Director Economy, Enterprise & Operations
• Chief Officer Moray Integrated Joint Board
The only new appointment to the Corporate Leadership Team during 2025/26 was the Executive Director of
Finance, Strategy & Transformation, who has also taken over the role of the Section 95 Officer. To ensure an
effective handover, the incoming Section 95 Officer and new Chief Finance Officer worked alongside the outgoing
Chief Finance Officer to gain an understanding of the operations of the Council. The key recruitment for the revised
corporate management structure is complete, with all Executive Directors and Heads of Service now appointed. In
2026/27, the Council’s focus will be on the future workforce, with the Council noting this will include forward
planning and training delivered to staff, as well as cultural improvements across the council.
Continued active leadership will be essential to help the Council navigate a period of organisational, financial and
service transformation, ensuring it is positioned to deliver its strategic objectives and respond effectively to future
challenges.
The Council have 
implemented changes to
the management structure
and have recruited into key
posts within the new
structure.
The Chief Executive’s
current active leadership,
has led to the successful
implementation of Phase 1
of the restructure.
Continued active
leadership will be essential
to ensure the Council
navigates the future
restructure and
transformation of the
Council.
Page 71

Page 72

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (4)
64
Wider scope area Wider scope audit response and findings Conclusion
Vision,
leadership and
governance
(continued)
Following the management restructure, the Council have revised the Scheme of Delegation which was approved at the
Council meeting held in December 2025.  The Councils Financial Regulations were also updated and approved at the
May 2026 Council meeting to reflect the revised finance structure.
The Council have begun preparations for Phase 2 of the restructure process, which will review service and team area
development aligned to the new operating model.  A key focus of Phase 2 will be strengthening organisational culture
and leadership capability. To support this, the Council has engaged external partners to help design and deliver a
cultural change programme, which will commence in July 2026.
The cultural change review is due to commence in July 2026, with work ongoing to finalise arrangements and ensure
that leadership development is co-designed with participants. The Council expects to have a detailed implementation
plan in place in the coming months, with the programme substantially completed by the end of 2026.  The Council
has also established performance indicators to measure the success of the restructuring programme and the
associated cultural transformation. The baseline collection for these indicators took place in April 2026 and
reporting will be to a future Council meeting as soon as practicable and annually thereafter.
Progress has also been made in recruitment, with four previously vacant lawyer positions now filled, although
vacancies remain within the finance team. Alongside this, the Council is developing a succession planning framework
to identify potential workforce risks arising from future retirements and to support the development of emerging talent
across the organisation.
As part of its wider workforce strategy, the Council is enhancing engagement with neighbouring authorities to explore
opportunities for collaborative working and shared services. Discussions have taken place with other local authorities
to assess opportunities in areas such as procurement and payroll, whilst the Council have also had early discussions
with the Improvement Service to identify further opportunities to work more collaboratively with partners.
The scheme of delegation
has been updated to
reflect the new
management structure.
The Council is making
progress in implementing
its restructuring
programme, although the
successful delivery of the
planned cultural change
programme and
remaining recruitment
challenges will be key to
achieving the long-term
objectives of the
restructure.
Page 72

Page 73

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (5)
65
Wider scope area Wider scope audit response and findings Conclusion
Vision,
leadership and
governance
(continued)
Governance Arrangements
The Council’s governance arrangements are detailed within the Annual Governance Statement (AGS), which forms
part of the Annual Accounts. We have reviewed the disclosures contained within the AGS and are satisfied that they
are appropriate and consistent with our understanding of the Council’s governance framework. Based on our
review, we have concluded that the Council has effective governance arrangements in place to support the
achievement of its objectives and the proper stewardship of public resources.
Through our attendance at Audit and Scrutiny Committee meetings, we observed that papers were comprehensive,
of a high standard, and circulated sufficiently in advance to support informed consideration by members. Meetings
allow adequate time for discussion of agenda items, enabling the Committee to challenge effectively, scrutinise key
issues, and fulfil its governance responsibilities. We also note that the Council have changed the lead in time for the
preparation of reports being presented to Committee, which enables members more time to scrutinise reports in
advance of meetings. 
Approach to Self-Evaluation
The Council are utilising the Public Service Improvement Framework (PSIF) to carry out self-evaluations across the
Council. There is an agreed programme of reviews in place, with nine reviews completed during 2025/26, including
reviews across HR, ICT, Organisational Development, Economic Development.  Information on the Council’s
approach to self-evaluation can be found via the interchange section of the Council website.
Following each self evaluation process, an Improvement Plan is drafted, with the findings from each review
developed into a list of improvement actions for implementation in future months. The implementation of actions is
monitored through the Service Planning performance monitoring framework. The findings from reviews to date have
identified some key themes which the Council are aiming to take forward, including findings around communication
and culture.
The Audit & Scrutiny Committee have requested feedback on the findings from the PSIF exercise, and a report is
expected to be taken to a future Committee meeting. 
The Council has effective
governance and scrutiny
arrangements in place, with
committees providing
appropriate oversight and
challenge to support good
decision-making and
accountability.
The Council have now
implemented self-
evaluation, with an agreed
process in place to ensure
all service areas are
considered on an ongoing
basis.
Page 73

Page 74

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (6)
66
Wider scope
area
Wider scope audit response and findings Conclusion
Vision,
leadership and
governance
(continued)
Internal Audit
The council has its own internal audit function which is led by the Audit and Risk Manager. The year-end
internal audit opinion was presented to the Audit and Scrutiny Committee on 18 June 2026. The Internal Audit
opinion for 2025/26 was “reasonable assurance can be placed on the adequacy and effectiveness of the
Council’s internal control system for the year ending 31 March 2026.”  This statement was included in the
2025/26 Annual Governance Statement.
Internal audit provide update reports to each Audit and Risk Committee meeting, including the results of follow-
up reviews to evidence the implementation of recommendations to the Audit and Scrutiny Committee. The
appendix to the update report provides an explanation from the service of progress against each
recommendation and revised timescales. The 2025/26 Internal Audit Report confirmed that for the majority of
follow-up reviews completed, most recommendations had been implemented. Some recommendations remain
outstanding, and as a result the senior management have introduced enhanced monitoring to support services
in implementing audit recommendations within the agreed timescales.
We have noted additional capacity has been added to the internal audit team during 2025/26, with the Audit
and Risk Manager confirming that current staffing levels are considered sufficient to meet the auditing needs of
the Council and its partner organisations.  The Internal Audit function has also previously received a positive
PSIAS external peer review during 2024.
Internal Audit provided a
reasonable assurance opinion
over the adequacy and
effectiveness of the internal
control system for the year
ended 31 March 2026.
Internal Audit delivered the
majority of planned activity
during 2025/26 and no
significant alterations were made
to planned activity.
There is effective follow up by
management, with progress
against audit recommendations
being followed up at each Audit
and Scrutiny Committee
meeting.
Page 74

Page 75

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (7)
67
Wider scope area Wider scope audit response and findings Conclusion
Vision, leadership
and governance
(continued)
Risk Management
The Council has a risk management policy designed to support the identification, evaluation and mitigation
of risks. The Council maintain a Corporate Risk Register, which considers risk themes and the principal risks
facing the Council. Service Risk Register’s are also in place which evaluate and manage potential
impediments to the delivery of services.  The registers describe how risks are managed and controlled.
The latest iteration of the Corporate Risk Register was considered at the Corporate Committee on 26 May
2026. All corporate risks are assigned risk ratings, scored between 1 – 25. Any risk with a score greater than
15 is considered a “very high” risk to the Council. Three risks are currently rated as very high risks:
• Financial: There is an on-going risk of financial failure with demand for services outstripping available
budget
• HR: Effect of staffing reductions on services
• IT: Major disruption in continuity of ICT operations
The risk register includes the rationale for each identified risk, the Council’s current risk appetite and the
current and proposed mitigations in place. Each risk is also assigned a risk owner who has overall
responsibility for management of the risk.
The Council need to continue to
take appropriate action to
mitigate the high risks in the risk
register
The very high level risks are
consistent with previous years and
continue to be assessed and
reported at regular intervals.
Page 75

Page 76

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (8)
68
Wider scope area Wider scope audit response and findings Conclusion
Vision,
leadership and
governance
(continued)
Partnership Working
The council, alongside NHS Grampian, is a key partner of the Moray IJB and therefore has an interest in the governance
arrangements of the IJB. The Chief Officer of the IJB regularly attends Council and Audit and Scrutiny Committee meetings
and provides reports summarising details of the Board’s activities. 
The Moray Growth Deal is a regional deal designed to boost economic growth across Moray. It is a long-term plan centred
around eight strategic specific projects, with an aim of improving economic growth across the region.  Total investment in
the deal exceeds £100 million and brings together both the Scottish and UK governments, the Council, partners from across
the public and third sectors and private businesses. Governance of the Growth Deal is through the Moray Growth Deal
Programme Board.
The Moray Growth Deal Annual Report was presented to the Council in June 2026 and covers the period up to 31 December
2025. Key achievements during 2025 included:
• Bus Revolution Phase 2 launched for northern coastal communities, expanding rural public transport services
• Construction began on the Elgin Town Hall redevelopment as part of the Cultural Quarter project
• The new Early Years Science, Technology, Engineering and Maths (STEM) Hub in Elgin was completed and service
launched.
The Council have a Local Outcomes Improvement Plan (LOIP) which outlines the creation and implementation of a vision for
the local area, including expected outcomes for the community. The LOIP is a partnership plan, and its strategic delivery is
overseen by a Community Planning Board, which meets quarterly. The Board comprises representatives from a broad range
of organisations. 
Looking ahead, the Council is pursuing a pan-Grampian approach alongside Aberdeenshire Council, Aberdeen City
Council, NHS Grampian and the Integration Joint Boards (IJBs), as part of its wider transformation agenda to support the
savings programmes of the Council, IJBs and NHS Grampian. Through regular engagement between the Chief Executives
and Chief Officers, the Council intends to shape shared approaches to service delivery, with an aim across region to deliver
more effective, sustainable services in the future.
The Council have
appropriate
arrangements in place to
ensure oversight of the
operations of its partners.
Page 76

Page 77

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources
69
Wider scope
area
Wider scope audit response and findings Conclusion
Use of
resources to
improve
outcomes
No risk
identified
Moray Council Corporate Plan 2024-2029
The Corporate Plan 2024-2029 was approved by the Council on 28 February 2024. The Corporate Plan is well set out, and
links clearly to other plans across the Council. Performance metrics are included along with a timetable for monitoring
achievements under the plan.
The Corporate Plan includes a clear set of priorities:
• Tackle poverty and inequalities
• Build stronger, greener, vibrant economy
• Build thriving, resilient, empowered communities
Progress towards achievement of the Council’s priorities are monitored via the Performance Management Framework (PMF).
The PMF identifies actions, separated into Strategic level actions (which sit within the Corporate Plan) and Service level
actions (which sit within service plans).  Both Strategic and Service level actions are included in six-monthly service
performance reports which are reported through service committees. To make the actions in the plan more flexible, these
are expressed as actions for 2024-2026, with actions subject to review at the end of that period.
Performance Reporting
The Council revised its Performance Management Framework (PMF) which was approved by the Corporate Committee in
February 2026. The PMF explains that the Council reports performance through a structured hierarchy of plans, indicators
and governance reports, with performance information being reviewed regularly by managers, senior officers and elected
members.
The Council have an
approved Corporate Plan,
and the achievement of
priorities is monitored via the
Performance Management
Framework.
Page 77

Page 78

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (2)
70
Wider scope
area
Wider scope audit response and findings Conclusion
Use of
resources to
improve
outcomes
(continued)
Performance Reporting (continued)
The Council publishes performance information through an online reporting framework on its website, providing public
access to the Council’s performance data. The system has a suite of published data which includes key LGBF indicators
alongside the council's own performance indicators which are linked to the priorities in the Corporate Plan. The LGBF data is
presented in a separate page, split across the Council's strategic priorities. The performance information is designed to be
more accessible to users, who can access up-to-date performance data.
The Annual Performance Report for 2025/26 is now published through the Council’s website, as opposed to a formal report.
The Council still prepare a Public Performance Report paper, which will be presented to full Council in September 2026 and
references where the performance information can be found on the Council’s website.
The Council publish performance information for both actions and performance indicators for the Corporate Plan, Local
Outcomes Improvement Plan (LOIP) and Service Plans. These are updated at the end of each quarter.  The ‘Actions’ report
provides a status update on the progress of actions, whilst the ‘Indicators’ report provides performance data for key
indicators, both on a RAG basis. Reports also provide historic data to show the performance trend for all data.  The Council
report progress on the actions in the Corporate Plan to full Council. 
In the year to March 2026, 25 Corporate Plan actions were due for completion.  Eleven actions were completed as planned,
however 14 actions have not been delivered by the planned deadline and will continue to progress out with their original due
date.  Overall, 80% of planned work was completed. The Council have also made progress against actions due to be
completed in future years, in relation to the Council’s digital approach and strengthening capital monitoring.
Based on the current 41 defined actions, the Plan is 49% complete. There were 68 corporate plan performance indicators, of
which 43 indicators have targets. 21 indicators were achieved or were within tolerance levels of target, whilst 18 indicators did
not meet expected levels of performance. In terms of short-term trend, when compared to the previous year’s result, 53% of
indicators show an improving trend, 19% a worsening trend, results remain unchanged for 7% and data is not available for
the final 21%. 
The Council are publishing
performance information in
a timely manner.
Appropriate arrangements
are in place for the
monitoring and reporting of
key performance indicators
and actions.
The Council must ensure
the actions set out in the
Corporate Plan remain
achievable by the planned
deadline.
Page 78

Page 79

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (3)
71
Wider scope
area
Wider scope audit response and findings Conclusion
Use of
resources to
improve
outcomes
(continued)
Overview of Performance Indicators
The table below provides detail on the Council’s performance across several key indicators. These indicators have
been chosen to show performance across the Council’s different priorities. Note: N/A = data not yet available.
The Councils Key
Performance Indicators show
a mixed level of performance,
with areas of both improving
and worsening performance.  Key Performance Indicators Target Benchmarking –
Comparator Avg.
2023/24 2024/25 2025/26 Trend
Percentage of pupils gaining 5+ awards at
Level 5 72% 66% 62% 64% N/A
Percentage of pupils achieving expected level
in Numeracy (P1,4,7 Combined) 83.4% 79.4% 76.5% 76.9% N/A
Percentage of pupils entering Positive
Destinations 95.2% 95.3% 93.8% 93.5% N/A
Moray median weekly earnings – by place of
work
Data
only £773.80 (Scotland) £667.10 £698.70 £658.80
Proportion of people earning less than the
living wage 11.4% 9.4% 14.4% 16.2% N/A
Gender Pay Gap – Moray being place of
work
Data
only 9.4% (Scotland) 12.5% 16.3% 9.9%
Town Vacancy Rates 9.0% 13.1% 14.1% 14.0 N/A
Number of affordable housing completions at
end of current financial year
Data
only N/A 97 110 91
Percentage of schools that are rated B or
better for suitability 100% N/A 100% 100% 100%
Page 79

Page 80

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (4)
72
Wider scope area Wider scope audit response and findings Conclusion
Use of resources
to improve
outcomes
(continued)
As outlined in the table above, in recent years the Council have been below the national average for exam
related performance.  Following the release of the 2026 exam results, we note that the Council recorded the
lowest percentage of Higher passes of any Scottish council in the 2026 results. At the September Education,
Children's and Leisure Services Committee, the committee agreed that an independent review should be
commissioned to assess the factors impacting attainment in Moray and identify strategic responses to support
sustained improvement. This review is anticipated to commence in the near future.
The independent review of
issues impacting the Council’s
exam performance will
commence shortly.
Page 80

Page 81

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (5)
73
Wider scope area Wider scope audit response and findings Conclusion
Use of resources
to improve
outcomes
(continued)
National Benchmarking Data
The Council particates in the Local Government Benchmarking Framework (LGBF).  The outputs include
information about how all Scotland’s councils perform and includes a range of indicators.  The most recent
national benchmarking overview report 2024/25, was published in March 2026.
The Council presented the 2024/25 LGBF results to the Corporate Committee in May 2026 (and Audit and
Scrutiny Committee in June 2026).  The information presented included the 2024/25 results data, as well as
the 2023/24 data (and earlier years if available) to allow further trend comparisons over time.  LGBF shows the
proportion of indicators which have either improved, deteriorated or stayed the same over time. 48% of Moray's
LGBF indicators have improved during the previous year, with 36% seeing declining performance.
An assessment of relative performance in recent years showed an improving trend up to 2020/21, followed by a
drop off in 2021/22. Thereafter the pace of recovery has slowed. The charts below show that for the indicators
currently published for 2024/25, there has been a slight drop in performance with indicator result values
worsening to a greater margin (53%) than those that have improved (41%).   The Council outlined that assuming
there is no significant change in rankings for the twenty-three indicators yet to be updated, the overall position
in terms of relative performance will remain similar to 2023/24.
In the year-end report, the Council provides an understanding of indicator in the lowest quartile (4th), with the
indicator number, the challenges, the actions to improve and expected outcomes noted.  This allows scrutiny
and assessment of each indicator. The report also includes the detail of each performance indicator and the
trend data for the four preceding years.  The Corporate Performance section of the Council’s website provides
the LGBF reports for the last five years.
The Council’s performance has
been mixed.  More
performance indicators are
lower when compared to the
previous period despite an
increase in expenditure.
Page 81

Page 82

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (6)
74
Wider scope
area
Wider scope audit response and findings Conclusion
Use of
resources to
improve
outcomes
(continued)
Further detail from Moray’s LGBF Report for 2024/25 reported in May 2026 is set out in the tables below. It
should be noted that a small percentage of indicators (highlighted in purple) are not yet published which
impacts the quartile calculations.
Data source: Improvement Service
For indicators currently published, the
Council’s performance against its
national and family comparators has
remained fairly static during the
reporting period, with the percentages
across quartiles remaining similar to
the previous year.
Page 82

Page 83

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (7)
75
Wider scope
area
Wider scope audit response and findings Conclusion
Use of
resources to
improve
outcomes
(continued)
The data for LGBF is live and is available for any member of the public to review for their council area.  As the LGBF
reporting was carried out in May 2026, a summary at July 2026 was obtained from the Improvement Service website
to note any further trends since May.  
Overall, since the base year of collection, the Council has improved performance for 52% of the indicators, with 44%
of indicators showing diminished performance.
When comparing performance to the data collected in the previous year, 48% of indicators have improved, whilst 36%
indicators seen a decrease in performance.
Change in indicators since base year collection                Change in indicators since prior year (2023/24)
Data source: Improvement Service
The Council’s progress in
improving indicators increased
compared to the base year,
with performance over the
previous 12 months showing
improvement for 48% of LGBF
indicators.
Page 83

Page 84

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (8)
76
Wider scope
area
Wider scope audit response and findings Conclusion
Use of
resources to
improve
outcomes
(continued)
National Performance Audits:
The Auditor General for Scotland and the Accounts Commission regularly publish performance audit reports that provide
insight into key risks, challenges and areas of good practice across local government. Many of the issues highlighted are
directly relevant to the Council and can support Members and officers in considering current and future service delivery,
financial sustainability and strategic planning.
During the year, reports of relevance included:
• Local Government Budgets 2025/26, which examined the significant financial pressures facing councils and the challenges
of delivering balanced budgets;
• Local Government Performance: Spotlight on Culture and Leisure Services, which considered the sustainability, demand and
future delivery of culture and leisure services;
• Local Government in Scotland: Financial Bulletin 2024/25, which provided an overview of the financial position of Scottish
local authorities and highlighted the continuing need for transformation and long-term financial planning.
• Integration Joint Boards: Finance Bulletin 2024/25, which reviewed the financial performance of Scotland's Integration Joint
Boards and highlighted ongoing pressures within health and social care services
The Council should continue to consider the findings and recommendations of these reports when assessing its own financial
and operational arrangements, as many of the findings are in line with the challenges currently being faced by the Council.
Public Sector Reform
Scotland's Public Service Reform Strategy commits to a fundamental shift in how public services are designed and delivered,
moving towards a system that is preventative, better joined up, and more efficient in meeting people's needs. Under the
Programme for Government 2026-31, this translates into a broader modernisation agenda: cutting bureaucracy, restructuring
health boards, and reviewing how social care is governed and delivered. For local authorities, the reform agenda encourages
greater service sharing, reduced duplication and waste, and a stronger role for local communities in shaping the services that
affect them. The Council has confirmed that, at this stage, the specific financial and operational impact of these reforms has
not yet been determined.
The Council is facing the
same type of financial
challenge as seen across
the local government
sector in Scotland
The reform agenda
presents both
opportunity and
uncertainty, and its
impact for local
government is currently
unknown.
Page 84

Page 85

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Best value conclusions
77
Under the Code of Audit Practice, the audit of Best Value in councils is fully integrated within the annual audit work performed by appointed auditors and their
teams. Auditors are required to evaluate and report on the performance of councils in meeting their Best Value and community planning duties. As part of our
integrated wider-scope annual audit work, we as appointed auditors use a risk-based approach to assess and report whether the audited body has made proper
arrangements for securing Best Value and is complying with its community planning duties, including reporting progress against previous Best Value findings and
recommendations.
The audit work performed on the arrangements the council has in place for securing Best Value and its community planning arrangements found these were
effective and appropriate. The work we have complete to support this conclusion is outlined below:
The Accounts Commission's approach to Best Value involves reporting on individual local government bodies and thematically across the local government sector
through performance reports. Our work on the Best Value thematic is set out below.
Best Value Thematic – Asset Management
In 2025/26, the Accounts Commission has directed auditors to report on how well are councils managing their assets to achieve their corporate objectives and
respond to challenges around financial sustainability and climate change? Our report, setting out our findings and improvement recommendations was presented
to Members in June 2026. Our conclusions, based on a series of questions posed by the Accounts Commission are set out below.
To what extent does the council have a clear asset management strategy and plans that are affordable, align with its corporate objectives, the changing needs
of its population, and net zero commitments?
The Council have a Corporate Asset Management Plan (CAMP), which was last updated in December 2024, and included actions which covered 2024/25. Whilst
the plan aligns with the Council’s priorities and the changing needs of its population, it is now considered to be out of date. The Council must ensure that the
CAMP is refreshed and that the arrangements in place for asset management are up-to-date. The Council have applied the CIPFA “cap” confirming that their
Capital Plans are affordable. The Council has noted that due to many years of below-inflationary funding, current plans are not sufficient to deliver the level of
investment required across the estate, which means the Council is required to continually prioritise and rationalise its asset base.
The Council should ensure that actions detailed in the plan are followed up and that existing governance arrangements are accurately reflected in the CAMP. The
Council have approved a ten-year Capital Plan which confirms a borrowing requirement of £253 million over the period. The Council have a range of documents
which highlight net zero considerations, including a route map to net zero.
Page 85

Page 86

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Best value conclusions (2)
78
To what extent do the council’s governance and accountability arrangements support effective asset management?
The Council’s governance and accountability arrangements provide a clear framework that supports effective asset management and provide assurance that asset
management decisions are transparent and aligned with the Council’s priorities. The Council has changed to a three-year planning approach for capital due to
significant levels of slippage in recent years.  The Council’s LGBF performance for asset management is below the Scottish average, and significant investment has
been made by the Council in these areas. The investment is having an impact and performance trends are improving from a low base.
To what extent does the council have a robust approach to working with partners and communities in managing its assets?
The Council works well with its partners and communities in the management of its assets; however arrangements could be strengthened by setting out how this
works in practice in a policy document.  The Council has mechanisms in place to engage with stakeholders, support community involvement, and work
collaboratively with partners to maximise asset use and value. The council has a clear and transparent approach to supporting and assessing community asset
transfer requests.
The report set out a number of recommendations for improvement in the following areas:
• Corporate Asset Management Plan (CAMP)
• Service Asset Management Plans
• Community Asset Transfer Policy
These recommendations have been replicated at Appendix C of this report. As the timescale for implementation of each recommendation is approximately 18
months, and there are no major updates in asset management since our report in June 2026, we have not included a follow-up on progress of agreed actions in this
report. We will follow up these recommendations and provide a progress update as part of our 2026/27 Annual Audit Report.
Controller of Audit Report
At least once every five years, the Controller of Audit reports to the Accounts Commission on each council’s performance in meeting its Best Value duties. Moray
Council was selected for review in 2023/24, with the Controller of Audit report published on 28 March 2024. 
Nine recommendations were made across a number areas and as part of our 2025/26 audit work, we have performed a follow-up review for the remaining
recommendations raised in the Controller of Audit report. This can be found at Appendix E.
Page 86

Page 87

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Best value conclusions (3)
79
Controller of Audit Report (continued)
Following the Controller of Audit Report being published, the Council established a combined Best Value Action Plan (BVAP), bringing together all
recommendations made in the Controller of Audit Report, external audit reports and previous BVAR reports. The action plan and progress against it are being
regularly reported to Members.
The Council refreshed the BVAP on 26 August 2025, which was approved by the Corporate Committee. The review aimed to update the BVAP to reflect progress
made, identify remaining improvement priorities, and support the Council's ongoing transformation and sustainability agenda. The refresh resulted in four new
actions being included within the BVAP, and several actions from the previous BVAP were either completed and removed or moved into business as usual.
An update on the refreshed BVAP was presented to the Corporate Committee on 26 May 2026. Overall, the Council has made good progress across most Best
Value themes, with several actions completed and others well advanced. The focus has been on strengthening governance, progressing transformation, improving
resilience, and embedding community engagement.
The Council have made good progress in actioning the recommendations made by the Controller of Audit. All recommendations are now closed, however two have
been superseded by recommendations raised as part of our own wider scope work. These are in relation to participatory budgeting and capital slippage, and we
have provided details of current progress and the actions the Council needs to take to address the recommendations. The Council have undertaken a robust self
challenge and improvement journey with many actions finalised and now business as usual.  The Council still have action to take in some areas, including a review
of culture and transformational change activities which will take time to implement. However, there is a more positive trajectory overall owing to direct leadership
and ownership and scrutiny of the actions and recommendations.
Page 87

Page 88

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Best value conclusions (4)
80
Council service performance improvement
The Accounts Commission's Statutory Performance Information (SPI) Direction 2024 is the latest statutory requirement that tells Scottish Councils the performance
information they must publish and report to the public. It came into effect from 1 April 2025 and applies for the period 2025/26 to 2027/28. The SPI Direction
requires the council to publish information that will:
• enable comparisons of performance between councils and over time
• show how well it is improving local outcomes with community planning partners in their area.
Auditors have a statutory duty to satisfy themselves that the council has made proper arrangements for preparing and publishing SPI in accordance with the
Direction and report a conclusion in the Annual Audit Report.
The arrangements the council has in place for preparing and publishing SPI were assessed by considering:
• whether information reported allowed comparison of performance between councils and over time
• the indicators it uses for reporting and whether it maximises use of the Local Government Benchmarking Framework (LGBF) indicators
• whether information reported was balanced, timely, and accessible
• whether information reported covered the four key areas set out in the Schedule to the Direction.
Audit work on the arrangements the council has in place for preparing and publishing SPI concluded the arrangements in place were effective and appropriate.
More detail on the overall approach to performance reporting can be found at page 69.
The Council reports performance through a structured framework that links corporate priorities to service objectives. Performance data is collected and monitored
through the Pentana system and subsequent reporting includes details on achievements, challenges and improvement actions. Performance is reported and
scrutinised at various levels, including via Departmental Management Teams, the Corporate Leadership Team and Committee. Performance Reports are produced
quarterly, half-yearly or annually depending on the area being monitored.
The 2025/26 Annual Governance Statement outlines the Council’s assessment of how it is performing against its duty of Best Value and the progress and status of
recommendations raised in the March 2024 Controller of Audit Report and previous best value assurance reports. The Annual Governance Statement also includes
details of the Best Value self-assessment exercise completed by council managers which identified priority areas for improvement.
Page 88

Page 89

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Appendices
81
Page 89

Page 90

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments
Impact of adjusted misstatements
All adjusted misstatements made during the course of the audit are set out in the table below, together with their impact on the Comprehensive Income and
Expenditure Statement (CIES), the balance sheet, and the reported net expenditure of the Council for the year ending 31 March 2026.
Note that with any of the adjustments there is no impact upon usable reserves.
82
We are required to report all non-trivial misstatements to those charged with governance, whether or not the accounts have been adjusted by management.
Detail Statement of Changes in Net
Expenditure £’000
Statement of Financial
Position £’000
Impact on total gross
expenditure £’000
Council Dwellings
The Council Dwellings valuation for 2025/26 was not
available for inclusion in the unaudited accounts, due to
the valuation being completed in August 2026. The
Council have subsequently input the valuation into the
accounts once details were received from the valuer,
which has resulted in the closing value of Council
Dwellings and the amounts recorded in the Revaluation
Reserve decreasing in 2025/26.
The overall impact on the financial statements was a
decrease to the closing balance in for PPE – Council
Dwellings of £236.9 million and a decrease to the
Revaluation Reserve of £236.9 million.
Dr Revaluation Reserve
£236,875
Cr PPE – Council Dwellings
(£236,875)
Nil
Page 90

Page 91

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments (2)
Impact of adjusted misstatements
83
Detail Statement of Changes in Net
Expenditure £’000
Statement of Financial
Position £’000
Impact on total gross
expenditure £’000
PPE – Other Land and Buildings
We identified that valuations included in the Valuers Report
had been incorrectly input into the Fixed Asset Register and
subsequently the PPE – Other Land and Buildings balance.
This resulted in PPE – Other Land and Building being
overstated. The overall impact on the financial statements
was a decrease to PPE – Other Land and Buildings of £2.261
million and a decrease to the Revaluation Reserve of £2.261
million.
The impact is through the CIES but mitigated through the
MIRS.
Dr Revaluation Reserve
£2,261
Cr PPE – Other Land and
Buildings
(£2,261)
Nil
Pension Figures
We identified that the fair value of plan assets calculated in
the second version of the actuary’s report was different to
the value disclosed in the annual accounts. This was a result
of the actuary providing an updated report based on actual
data for the year.
Due to the application of the asset ceiling under IFRIC 14,
the overall impact on the financial statements was nil,
however within the pensions disclosure was updated to
reflect an decrease in the fair value of plan assets of £1.939
million and a decrease in the asset ceiling of £1.939 million.
Dr Asset Ceiling adjustment
£1,939
Cr Fair Value of Plan assets
(£1,939)
Nil
Page 91

Page 92

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments (3)
Impact of adjusted misstatements
84
Detail Statement of Changes in
Net Expenditure £’000
Statement of Financial Position
£’000
Impact on total gross
expenditure £’000
PFI Schemes
We identified that the closing balance for PFI schemes was incorrect.
This was a result of an error processed in the calculation adjustment
in 2024/25 as part of the transition adjustment to IFRS 16.
This resulted in the PFI Liability being overstated. The overall impact
on the financial statements was a decrease to the Right of Use asset
of £6.035 million and a decrease to the Lease Liability of £6.035
million.
Dr ST ROU Liability £3
Dr LT ROU Liability £11,453
Cr ROU GBV (£11,456)
Dr ROU GBV £5,418
Cr ROU Liability (£5,418)
Nil
Provision for Nether Dallachy
We identified that the Council should have created a provision for the
ongoing monitoring of the Nether Dallachy landfill site, which closed
in May 2025. This resulted in the closing value of provisions and
expenditure in the CIES being understated.
The overall impact on the financial statements was an increase to
provisions of £6.040 million and an increase to the other service
expenditure of £6.040 million.
Dr PPE – Other Land and
Buildings
£6,040
Cr Provisions
(£6,040)
Nil
Page 92

Page 93

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments
Impact of adjusted misstatements – prior period error
85
Detail Statement of Changes in Net
Expenditure £’000
Statement of Financial
Position £’000
Impact on total gross
expenditure £’000
Prior Period Amendment – Council Dwellings 2024/25
We identified that the revaluation of Council Dwellings
during 2020/21 was calculated using an incorrect
methodology, resulting in the 2020/21 closing balance
being misstated. Due to Council Dwellings only being
subject to full valuation once every five years, future
years closing balances were also incorrect due to being
rolled forward. This resulted in the closing value of
Council Dwellings and the amounts recorded in the
Revaluation Reserve being overstated in 2024/25.
The overall impact on the financial statements was a
decrease to the closing balance in 2024/25 for PPE –
Council Dwellings of £194.2 million and a decrease to the
Revaluation Reserve of £194.2 million.
Dr Revaluation Reserve
£194,200
Cr PPE – Council Dwellings
(£194,200)
Nil
Page 93

Page 94

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments (4)
Misclassification and disclosure changes
The table below provides details of substantive misclassification and disclosure changes identified during the audit which have been made in the final set of
financial statements. This list of misclassification and disclosure changes reflects presentational adjustments to the financial statements which have no impact on
the Council’s reported financial position.
Moray Council 2024-25 Annual Audit Report 86
Disclosure Auditor recommendations Adjusted?
General There were minor changes noted to grammar and to correct spelling and other consistency issues.  The Council
has corrected these in the final version of the financial statements. Such changes are are expected and do not
warrant detailed explanation.
Yes
Annual Governance
Statement
We requested additional disclosure was added to the Annual Governance Statement to ensure the statement
complied with the Delivering Good Governance in Local Government Framework and addendum.
Yes
Remuneration and
Staff Report
We identified that PILON payments had not been included within the settlement agreement amounts in the exit
packages table of the remuneration report. There were two settlement agreements for 2025/26 and the PILON
payments total £30,855 and have been added into the disclosure.
We identified that three Councillors’ salaries incorrectly disclosed in Table 1 of the Remuneration Report as they
disclosed the full-time equivalent totals as opposed to the actual totals for the year. The disclosure was updated
to include the correct totals.
We identified that the full time equivalent salary information for the Interim Chief Executive incorrectly included
employer’s national insurance contributions in the calculation. This has now been removed.
Yes
Note 2 Prior Period
Amendments
The comparative figures in the 2025/26 accounts were restated as a result of a management restructure during
the year. We requested that management add a disclosure note to the accounts which showed how figures
shown in the previous structure were represented in the 2025/26 annual accounts.
Yes
Page 94

Page 95

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments (5)
Misclassification and disclosure changes (continued)
Moray Council 2024-25 Annual Audit Report 87
Disclosure Auditor recommendations Adjusted?
Note 5 Critical
Judgements in
Applying Accounting
Policies
We identified that the critical judgement in relation to the valuation of PPE assets should be updated to reflect
the updated CIPA guidance which now allows assets held at current value to be revalued on a rolling basis over
a five-year cycle, with annual indexation applied to assets where appropriate during the four intervening years.
Yes
Note 15 – Property,
Plant & Equipment
We identified that the PPE table required to be amended to show the full Council Dwellings valuations totals
which has been unavailable for the first version of unaudited accounts. The PPE table also incorrectly excluded
the accumulated depreciation row for the derecognition of disposals, however the totals on the table were
correct.
We identified that the depreciation total for infrastructure assets was incorrect and was updated from £7.512
million to £8.054 million. The prior period comparative also required to be amended to show the correct
depreciation figure of £7.512 million.
We identified that there were assets being depreciated outwith the useful life policy and therefore the Council
amended the policy to provide an accurate reflection of the useful life for different categories of assets.
Yes
Note 19 - Financial
Instruments
We identified that the amount for short term borrowings incorrectly included the PWLB balance of £19.159
million. The note was amended to reflect the correct value of £120.285 million.
We identified that the finance lease liabilities only included the long-term element of the liability and excluded
£1.745 million of the short-term element of the liability. This has been amended by the Council.
Yes
Note 26 - Provisions The Council included a new provision on the Balance Sheet in 2025/26 for the Council’s share of the estimated
costs associated with restoring the Energy from Waste site to its original condition at the end of facility’s
operational life. We identified that the provision note did not include details of the provision and requested this
detail was included within the note.
Yes
Page 95

Page 96

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments (6)
Misclassification and disclosure changes (continued)
Moray Council 2024-25 Annual Audit Report 88
Disclosure Auditor recommendations Adjusted?
Note 29 - Capital
Grants and Receipts
Unapplied Account
We requested that the presentation of the note be updated to clearly show what the applied capital grants
balance of £1.417 million related too.
Yes
Note 34 – External
Audit Costs
The external audit costs note was amended to include details of the final agreed audit fee for the 2025/26 audit Yes
Note 36 - Grant
Income and
Contributions
We identified that the split of this note did not agree to Note 9 and other areas of the annual accounts and
requested the Council review and update the disclosure to provide an accurate reflection of the grant income
received.
Yes
Note 40 – Leases
(Council as a Lessor)
We identified that the operating lease table was excluded from the first version of the accounts and requested
this was re-instated.
We identified that the right of use asset table did not agree to the PPE Note 15, and it did not cast correctly. We
also identified that the opening balance for 2025/26 was incorrectly disclosed as recognition of right of use
assets, as opposed to an opening balance. This has been corrected by the Council.
Yes
Note 43 – Defined
Benefit Pension
Schemes (continued)
We identified that additional disclosure was required to an update on the legal judgement on the Virgin Media
case, confirming that there remains uncertainty as to whether the case will apply to the Local Government
Pension Schemes.
Yes
Note 44 – Contingent
Liabilities
We identified that additional disclosure was required in relation to the Energy from Waste Project to disclose
that an arbitration process is underway, and the Council considers that any potential financial exposure is
uncertain.
Yes
Page 96

Page 97

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments (7)
Impact of unadjusted misstatements
The table below provides details of  all non-trivial errors which we identified during the course of our 2025/26 audit which management decided not to amend
within the final set of financial statements.  The unadjusted misstatements will be included in the Letter of Representation.
89
Detail Statement of Changes in
Net Expenditure £’000
Statement of Financial
Position £’000
Impact on total gross
expenditure £’000
Reason for not
adjusting
Indexation – PPE - Other Land and Buildings
We identified that the index used to calculated
the indexation applied to DRC assets within Other
Land and Buildings was based on provisional
index data and not final index data. If final index
data had been used, this would result in an
increase in PPE and the revaluation reserve of
£1.720 million.
The Council have not adjusted the accounts for
this issue.
Dr PPE – Other Land and
Buildings
£1,720
Cr Revaluation Reserve
(£1,720)
Nil Non-material error.  
Page 97

Page 98

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments (8)
Impact of unadjusted misstatements
90
Detail Statement of Changes in
Net Expenditure £’000
Statement of Financial
Position £’000
Impact on total gross
expenditure £’000
Reason for not
adjusting
PPE – Other Land and Buildings
We identified that valuations included in the
Valuers Report had been incorrectly input into the
Fixed Asset Register and subsequently the PPE –
Other Land and Buildings balance. This resulted in
PPE – Other Land and Building being overstated. If
these were corrected, the overall impact would be a
decrease to PPE – Other Land and Buildings of
£0.905 million and a decrease to the Revaluation
Reserve of £0.905 million.
The impact is through the CIES but mitigated
through the MIRS.
Dr Revaluation Reserve
£905
Cr PPE – Other Land and
Buildings
(£905)
Nil Non-material error.  
PPE – Other Land and Buildings
We identified errors in the calculations of PPE
valuations, due to incorrect input data being used
by the valuer. If these valuations were corrected,
the overall impact would be an increase to PPE –
Other Land and Buildings of £0.591 million and an
increase to the Revaluation Reserve of £0.591
million.
The impact is through the CIES but mitigated
through the MIRS.
Dr PPE – Other Land and
Buildings
£591
Cr Revaluation Reserve
£591
Nil Non-material error.  
Page 98

Page 99

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments (9)
Impact of unadjusted misstatements in the prior year
The table below provides details of all unadjusted misstatements brought forward from the 2024/25 audit. Management did not amend the financial statements
for these errors, as they were not material. The impact for 2025/26 is not material and therefore management did not amend the current financial statements for
these prior period unadjusted errors.
Note: In not amending the items identified on pages 89 and 90 for the in year unadjusted misstatements and assessing the cumulative misstatements brought
forward in 2025/26, the amounts combined are not material to the 2025/26 accounts.
91
Detail Statement of
Changes in Net
Expenditure £’000
Statement of Financial
Position £’000
Impact on total net
expenditure £’000
Reason for not
adjusting
Cash and Cash Equivalents (relates to 2023/24)
The cash and cash equivalents figure in the 2023/24 accounts
was incorrect due to funds held on behalf of the Trust Funds
being included as a cash and cash equivalent in the Balance
Sheet when it should have been removed on consolidation. The
2024/25 closing balance was correct. 
Note: This does not impact 2025/26. The issue related to
2023/24 and was corrected in 2024/25.
Dr  Creditors
£2,252
CR Cash and Cash
Equivalents
(£2,252)
Nil Non-material error.  
Right of use asset and associated liability
Five leases were not included as a right of use asset. If these
asset were included, the impact would be an increase in the
opening right of use asset figure of £1.123 million and an
increase to the opening lease liability figure of £0.866 million. 
The Council have not adjusted the accounts for this issue.
This has been adjusted in 2025/26 with the five leases now
correctly disclosed in the accounts
Dr Right of Use Assets
£1,123
CR Lease Liability
£866
CR Creditors
£257
Nil Non-material error.  
Page 99

Page 100

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
B. Action plan and recommendations – financial statements audit
92
We have identified one financial statement recommendation for Moray Council and the group during our audit of the financial statements for the year ended 31
March 2026. We have agreed our recommendations with management and will report on progress on these recommendations during our 2026/27 audit. The matters
reported here are limited to those deficiencies that we have identified during the course of our audit and that we have concluded are of sufficient importance to merit
being report to you in accordance with auditing standards.
Assessment Issue and Recommendation Management Response
Medium 1. Local Code of Corporate Governance
The Council have not updated its Local Code of Corporate
Governance to align with the revised CIPFA/SOLACE Delivering
Good Governance in Local Government guidance, which places
greater emphasis on robust governance reviews, the use of
assurance evidence, and a forward-looking assessment of
governance arrangements.
Recommendation:
We recommend that the Council incorporate the requirements and
expectations of the revised CIPFA/SOLACE guidance, ensuring that
governance arrangements remain current, effective and fully
aligned with the requirements applicable from 2025/26 onwards.
Management agrees to establish the Code as a primary Council
governance document which informs the Annual Governance
Statement.
Action Owner: Chief Governance Officer
Timescale for implementation: 31 March 2027
High – significant effect on the financial statements.
Medium – limited effect on the financial statements.
Best practice
Page 100

Page 101

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
C. Action plan and recommendations – best value thematic 2025/26
93
Based on the audit work performed in 2025/26, the three recommendations arising from the best value thematic review are set out below. Given the timing for
implementation of each recommendations, no follow up on recommendations has been made at this time.
Issue / risk Recommendation Agreed management response
1. Corporate Asset Management Plan (CAMP)
The CAMP has not been reviewed since December 2024 and is
out of date. The current version of the CAMP only covers a
single year and does not consider the longer term. 
Furthermore, the Council have not reported on the outcomes
of the existing CAMP and therefore it is unclear what actions
were achieved.
Our review of the existing CAMP confirmed that there was
minimal detail on the performance of the Council’s estate and
no information around the current condition of assets or
occupancy rates.  We also identified that there was limited
consideration around how the Council, its services and the
community is changing.
The current version of the CAMP does not include any detail
around the governance arrangements and how progress
towards actions identified will be monitored, nor how
outcomes will be reported on conclusion. 
The Council works alongside partners and its communities in
the management of assets, and there is clear evidence that
this works well in practice. However, we have noted that the
arrangements for partnership working are not set out. It is
important that the roles and responsibilities of both the
Council and its partners are clearly defined, which will ensure
there is transparency in the overall approach.
The Council should update the Corporate Asset
Management Plan and present the final version to
members for approval.
The Corporate Asset Management Plan should confirm
how the Council’s plan to manage its assets over the
longer term.
In updating the Corporate Asset Management Plan, we
recommend the following is considered:
• the Council include key information on the
performance of its estate, including consideration on
how service delivery and its communities are
changing
• confirm how progress towards the actions identified
within the plan will be monitored
• actions identified are included within an Action Plan,
complete with an action owner and timeframe for
completion. 
• set out a clear approach on how the Council will
work alongside its partners and communities to
deliver effective management of the Council’s assets.
The Council should ensure that the outcomes from the
CAMP are reported annually.
The Corporate Asset Management Plan
will be updated to reflect the current year
(2026/27) and structural changes since it
was last reviewed in December 2024. This
will be presented to members for approval
in August 2026 at Corporate Committee.
A holistic review of the strategic asset
management will be conducted by the
new Section 95 Officer and that is
planned over the next 12-18 months, with
the outturn of that exercise being
incorporated into the updated Corporate
Asset Management Plan. This review will
also incorporate the recommendations of
this Best Value Thematic.
Action Owner: Executive Director Finance
Strategy and Transformation
Timescale for implementation: 30
November 2027
Page 101

Page 102

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
C. Action plan and recommendations – best value thematic 2025/26 (2)
94
Issue / risk Recommendation Agreed management response
2. Service Asset Management Plans
The Council maintain Service Level Asset
Management Plans (SLAMP) for ten service areas,
which set out the plans in place for managing
assets within that operational service. Of the ten
services where a SLAMP should be prepared, the
Council consider three as fully up-to-date, six in
need of review and one service where there is no
SLAMP in place.
It is important that services have up-to-date asset
management plans to ensure that the assets which
fall under that services remit are understood and
managed effectively, therefore reducing the risk of
failure and unexpected costs.
The Council should carry out a review of all service
level asset management plans and ensure that they
are up-to-date and fit for purpose. 
Service Level Asset Management Plans (SLAMP) will
be updated to compliment the revised Corporate
Asset Management Plan. The SLAMPs will reflect the
requirement for the Council to effectively manage
the decline of its asset base due to unsustainable
funding to maintain its entire estate.
Action Owner: Each Head of Service
Timescale for implementation: 30 November 2027
3. Community Asset Transfer Policy
The Council maintain a Community Asset Transfer
Policy, which was last approved by the Policy and
Resources Committee in May 2014.  Due to the
length of time that has passed since the policy was
last reviewed, the Council should confirm it
remains fit for purpose.
The Council should review the Community Asset
Transfer Policy and confirm it remains fit for
purpose.
The Community Asset Transfer Policy will be
reviewed to confirm it remains fit for purpose
Action Owner: Executive Director Finance, Strategy
and Transformation
Timescale for implementation: 30 November 2027
Page 102

Page 103

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
D. Progress against Controller of Audit recommendations
95
Our follow up of the recommendations made by the Controller of Audit in her report of March 2024 is set out below. This include the previous update position in
September 2025 and a progress update at September 2026.  All nine recommendations raised in the report have been closed; however, two recommendations have
been superseded as similar recommendations have been raised in our wider scope work.
Assessment Recommendation Position at September 2025 Update at September 2026
Closed
(Superseded)
The council should
undertake further
consultation and
engagement to ensure
local communities are
more involved in
participatory budgeting
Management Response: The Council is launching
the new Moray Engage tool to expand and
improve online engagement.  This will incorporate
the capturing of views from the community to
influence the decisions the council makes across
its financial planning.  This will be applied to
specific exercises and to the whole council
financial planning.  A citizens panel-type
approach will be developed later this year.
Examples of the significant range of community
engagement work that the council has undertaken
include: library user groups; leisure user groups;
school estate planning; bus revolution
Embedded as business as usual.
Audit Team Conclusion: The Council have taken
steps to address the recommendation and further
developments are planned later in the year to
ensure communities have their opinion on how the
Council spends its money. This is still a work in
progess and the Council need to continue to
develop overall approach to Participatory
Budgeting.
Management Response: The Council has embedded the use
of Moray Engage to help capture the views of the community
to influence decisions the Council makes in relation to
financial management. A current live consultation is on-going
in relation to Moray Music Centre. This is driven by the need
for the centre to achieve full cost recovery.  Other examples
include the introduction of a visitor levy.
Audit Team Conclusion: The Scottish Government have a set
target that 1% of a local authority’s budget should be
allocated via Participatory Budgeting. The Council have yet to
achieve this target. As part of its key performance reporting,
the Council are aiming to achieve 100% of the Scottish
Government target. For 2025/26, the Council has reported
that 38.5% of the target has been achieved. This remains
below target levels.
Note – We have a further recommendation on participatory
budgeting, which has been followed up in year at Appendix F.
Based on the fact both recommendations are around
Participatory Budgeting, this recommendation will be closed.
Further follow-up to confirm implementation of Participatory
Budgeting will be carried out via the other recommendation.
Recommendation closed.
Page 103

Page 104

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
D. Progress against Controller of Audit recommendations (2)
96
Assessment Recommendation Position at September 2025 Update at September 2026
Closed. The council needs to
finalise the
performance and
delivery framework for
its new Corporate Plan.
It should implement
annual self-evaluation
to identify strengths as
well as areas for
improvement
Management Response: The PSIF programme has been re-
established with the support of the IS - HR, ICT&OD completed in
June and an ongoing programme is in place. Performance
reporting format has been refined to give improved insight to
progress monitoring.
Audit Team Conclusion: The Council continue to work towards a
completion date of March 2026 for the implementation of an
approach to self-evaluation, in line with the agreed timescales in
the BVAP. A  programme to re-activate PSIF has been agreed by
ECLT for services that do not currently use PSIF or an alternative
improvement tool. The first service (HR, ICT&OD) is being
supported by the Improvement Service with council officers
attending to learn from the process to support further roll out
across the Council. The planned programme will be reviewed and
refined as experience builds.
A workshop was scheduled for 3 June 2025 to undertake the
annual self-assessment (the second self assessment the Council
have carried out). This included consultation with the
Chair/Depute of ECLS and work with ECLT ahead of the
workshop session.
The Council are still aiming to introduce service scorecards and
need to confirm whether current systems are designed to meet the
scorecard expectations. This remains a work-in progress.
The Council's journey to self-evaluation remains ongoing.
Management Response: This has now been
embedded, and the PSIF programme is underway.
The programme for 2025/26 included: HR, ICT,
Organisational Development, Economic
Development. The review of Finance is currently
underway.
Further detail on programme can be found via the
interchange section of the Council website.
Audit Team Conclusion: The Council have now
implemented the approach to self-evaluation, with
nine service areas reviewed between September
2025 and May 2026.
Following each exercise, an Improvement Plan is
drafted, with the findings from each review
developed into a list of improvement actions for
implementation in future months.
Implementation of actions is monitored through the
Service Planning performance monitoring
framework.
Recommendation closed
Page 104

Page 105

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
D. Progress against Controller of Audit recommendations (3)
97
Assessment Recommendation Position at September 2025 Update at September 2026
Closed
(Superseded)
The council should
continue to monitor
any slippage of the
capital plan
Management Response: Work with capital budget
managers appears to be giving results with slippage
considerably less that has been the case previously. 
Spend at 31 March 2025 90% of budget (2023/24 - 71%) 
This is part of our normal monitoring process.
Audit Team Conclusion: The Council's initial capital
budget for 2024/25 was £49.662 million. During the
year, significant alterations were made to the plan,
resulting in a revised budget for the year totalling
£30.268 million. The year-end outturn for capital was
£27.219 million, meaning that capital slippage for
2024/25 was approximately 90% of the final capital
budget.  However, the year-end slippage of 90% was
only as a result of the changes made in year to the
budget - the year end outturn was significantly
different to the initial planned budget.
From 2025/26 onwards, the Council are changing to a
three-year planning approach for capital. The Council
anticipate budget managers will be more realistic in
terms of spend profiles and it should also encourage
budget managers to lengthen the period over which
capital is spent. Annual revisions to the capital
programme will be carried out to reflect any additional
funding or other changes to the capital programme.
Management Response: The Capital Plan is reviewed annually
and prepared with the best available information at the time (in
November/December). The Capital Plan for 2025/26 was set at
£50.5 million. Q1 saw a rephasing to both the Moray Growth
Deal and Levelling Up Fund (£20 million) - both large economic
development projects what are impacted by external forces
often outside the control of the Council.
Greater scrutiny of capital spend has been embedded in the
capital monitoring reports, included a RAG status and
requirement for budget managers to provide mitigating
measures to recover from slippage where appropriate. Capital
Monitoring is also programmed to be available via FMS for
2026/27, with a pilot scheme in 2025/26 as proof of concept.
Initial feedback is the increased reporting tools are useful.
Audit Team Conclusion:
The three-year capital planning approach is in its infancy, and
change will take time. However, the Council must take
appropriate steps to limit the level of slippage in future years.
Note – We have a further recommendation on capital planning
which has been followed up in year at Appendix F. Based on the
fact both recommendations are on the same topic, this
recommendation will be closed.
Recommendation closed.
Page 105

Page 106

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations
98
We identified the following issues in our prior year audits of Moray Council’s financial statements, which resulted in seven recommendations being reported in our
2024/25 Annual Audit Report. We have performed additional work in year to obtain assurance whether the recommendations from prior years have been closed and
resolved in the current year or whether the issue still exists and the recommendation remains open and/or in progress. Two out of seven recommendations have been
cleared with two in progress and three still open.
Recommendations from the financial statements audit
Assessment Issue and risk previously communication Management update on actions taken to
address the issue
Auditor conclusion
Open Working Papers
The working papers presented for audit is an area where
improvement is required. The audit team had a challenge in
agreeing information from the accounts to the trial balance,
particularly in relation to internal recharges.  Many of working
papers presented for audit contained only ‘hard coded’
information. This made it difficult to understand how numbers
included in the financial statements had actually been calculated.
The Council have recognised there is an underlying issue with the
working papers presented for audit and intend to undertake a
refresh in the near future.
Recommendation
Review the working papers presented for audit, ensuring they
contain all required information and justification as to how figures
included in the financial statements have been calculated,
On-going.
The Council will soon be moving to
Sharepoint Online. It is anticipated this
should allow for better linking to working.
Current Sharepoint can at times break
linkages, as such has often been avoided.
The working papers presented
for audit were largely in the
same format as previous years.
There continued to be instances
where “hard coded” information
was included in the working
papers.
The finance team have
confirmed they intend to review
working papers being prepared
and presented to audit.
Recommendations remains
valid.
Revised Target Date: 31 March
2027
[Red] Recommendation is open
[Amber] Recommendation is in progress
[ Green] Recommendation is closed Page 106

Page 107

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (2)
99
Recommendations from the financial statements audit
Assessment Issue and risk previously communication Management update on actions taken to
address the issue
Auditor conclusion
In progress Finance Team Capacity
During the 2023/24 audit, there has been a high
turnover of staff in key positions within the finance
team. There remains one vacant post within the
finance team and the Council should seek to add
additional capacity to ensure future audits can be
delivered to target deadlines.
Recommendation
The Council should ensure the finance team has a
sufficient level of staff to cope with the demands of
audit.
The Council had a recruitment freeze during
Phase 1 management restructure. The
finance team are now progressing with a
Change Management Plan under the Phase
2 restructure. There are currently two
vacancies within team.
Despite the vacancies, the Accountancy
team still met all statutory deadlines, return
deadlines as well as presenting a balanced
budget before the new financial year. This
demonstrates an element of resilience within
the team, with the expected capacity and
capability in the team to meet audit
demands.
The Council continues to experience
vacancies within the finance team, which
places additional pressure on existing
resources and reduces the capacity within
the service. During the audit, the finance
team experienced shortages due to staff
absence which led to some delays in audit
evidence being received.
The Council should continue its recruitment
efforts to ensure the finance team has
adequate resource. This will be achieved
through the creation of two new Finance
Partner posts, and the recruitment of a new
Senior Accountant which is ongoing.
Recommendation remains valid.
Revised Target Date: 31 March 2027
Page 107

Page 108

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (3)
100
Recommendations from the financial statements audit
Assessment Issue and risk previously communication Management update on
actions taken to address
the issue
Auditor conclusion
Open Accounting for Infrastructure Assets
In accordance with the temporary relief offered by Local
Government Circular 09/2022 Statutory Override
Accounting for Infrastructure Assets, the 2023/24 accounts
did not include disclosure of gross cost and accumulated
depreciation for infrastructure assets. This is due to
historical reporting practices and resultant information
deficits meaning the asset position would not be accurately
presented in the financial statements.
The Statutory Override is temporary and whilst it will
continue to apply in 2024/25, the Council need to ensure
their records are up-to-date and in a position where they
could disclose the correct information in the accounts if
required.
Recommendation
The Council should review its accounting records for
Infrastructure Assets and ensure they are up-to-date and
have all required information.
The accountancy team
prioritises needs and
reviews around
resources/capacity. The
statutory override has been
extended until 31 March
2027 and Moray will take
advantage of that override
for 2026/27.
The statutory override has been extended in Scotland
until 31 March 2027. The Statutory Override is
temporary, and whilst it will continue to apply in
2025/26, the Council need to ensure their records are
up-to-date and in a position where they could disclose
the correct information in the accounts if required.
Whilst there will be no requirement to include this
information in the 2026/27 accounts, as part of the
look ahead process, the Council must ensure it has
adequate processes in place to account for its
Infrastructure Assets when the statutory override is no
longer in place.
Recommendation remains valid.
Revised Target Date: 31 March 2027
Page 108

Page 109

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (4)
101
Recommendations from the financial statements audit
Assessment Issue and risk previously communication Management update on actions taken to
address the issue
Auditor conclusion
Open Revaluation Reserve Working Paper
The Council do not prepare a revaluation reserve
working paper which shows the balance held in the
revaluation reserve and the movement on the
reserve during the year. Whilst we were able to
obtain this information, the Council should prepare
a separate working paper which shows all required
information and how movements in year have
impacted each assets reserve balance.
Recommendation
The Council should prepare a working paper which
details the revaluation reserve movements during
the year.
The accountancy team are currently in
dialogue with the provider of its asset
management system to remedy an
anomaly with the reports it produces. The
system is accurately able to show
movements in the year, however, has issues
with opening and closing balances which
requires manual adjustment.
Working Paper to be uploaded to Inflo as
part of duplicate audit query.
The Council has not introduced a
revaluation reserve working paper during
2025/26. As was the case in the previous
year, we were able to obtain the information
required to complete our audit testing,
however this was on an asset-by-asset
basis. The Council should maintain a
revaluation reserve working paper as a
matter of course.
Recommendation remains valid.
Revised Target Date: 31 March 2027
Page 109

Page 110

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (5)
102
Recommendations from the financial statements audit
Assessment Issue and risk previously communication Management update on actions taken to
address the issue
Auditor conclusion
Closed Recommendation – Group Reserves
Review the terminology within the financial
statements regarding the descriptors for the group
reserves and ensure all reserves on the balance
sheet are categorised to unusable or usable
reserves.
This has been addressed. Terminology has been updated and reflects
the revenue reserves held on behalf of the
Trust Funds and Common Good
Recommendation closed.
Page 110

Page 111

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (6)
103
Recommendations from the financial statements audit
Assessment Issue and risk previously communication Management update on actions taken
to address the issue
Auditor conclusion
Closed Asset Revaluation
The audit team met challenges when
completing work on the significant risk area
relating to valuations of land and buildings
and council dwellings. We identified several
errors in the valuation reports provided to
audit and instances where data had not been
updated from the previous year.
We have been made aware that the valuer
will be changing in 2025/26 and the Council
will need to ensure the requirements of the
audit are understood and factored into the
work programme to allow timely and
comprehensive response to audit queries.
Recommendation
The Council should ensure there is early
discussion with the new valuer and external
auditors and ensure capacity is built into the
future work program to deal with audit
responses and queries timely and
comprehensively.
The Service Manager, Property, Estates
& Assets met with the auditor in
September 2025 to receive feedback
on the process and expectations.
For 25/26 housing valuations an
external consultant will be brought in
to ensure information is prepared on
time. This will result in a secondary set
of draft accounts needing to be issued
(if there are material changes from first
version) and auditors have been made
aware of our intentions. The Audit and
Scrutiny Committee were advised and
approved this approach on 25 March
2026.
Overall, while the response rate to audit queries was
slower than expected, we received all required data in
full to support our audit conclusions. The audit team
required to follow up a number of our audit requests due
to incomplete information, which resulted in delays to
procedures and prevented us completing the valuations
work in line with our anticipated workplan. We had
aimed to complete the PPE valuations work in advance
of the Council Dwellings procedures following the
Council making us aware early in the year that the
Council Dwellings valuation would not be available in
time for the unaudited accounts.
The receipt of the Council Dwellings valuations data was
partially delayed, however this was a direct result of the
management’s challenge over the significant change in
the Council Dwellings valuations, which subsequently
resulted in a prior period amendment being processed in
the accounts. The VOA provided this data in line with
their confirmed timeframe.
The recommendation has been closed as it relates to
discussion with the new valuer, however management
must ensure the estates team and internal valuer have
sufficient time to deal with audit request in future years.
Recommendation closed.
Page 111

Page 112

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (7)
104
Recommendations from the financial statements audit
Assessment Issue and risk previously communication Management update on actions taken to
address the issue
Auditor conclusion
In progress Asset Verification Exercise
From our review of the Fixed Asset Register, the
Council has approximately £6.329 million of assets
held at Nil NBV. To confirm these assets remain
operational, the Council should complete an asset
verification exercise. The asset verification exercise
should be implemented as business-as-usual going
forward, therefore ensuring that assets are removed
from the Fixed Asset Register as they are disposed.
Recommendation
The Council should ensure that the asset verification
exercise is implemented as a business-as-usual
activity in future years.
An accounting policy on assets at nil value
is being drafted and due to be in place for
the 2026/27 financial year end.  This will
cover all asset classes.
The Council have a verification process in
place and have confirmed that an
accounting policy on assets at nil value is
being drafted and will cover all asset
classes. This is due to be in place for the
2026/27 financial year end. 
Recommendation remains in progress until
we have viewed the updated policy and
confirmed it is appropriate.
Recommendation remains valid.
Revised Target Date: 31 March 2027
Page 112

Page 113

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (8)
105
We identified the following issues in our prior year wider scope work, which resulted in 13 recommendations being reported in our 2024/25 Annual Audit Report. We
have performed additional work in year to obtain assurance whether the recommendations have been closed and resolved in the current year or whether the issue
still exists and the recommendation remains open and/or in progress. Eleven out of 13 recommendations have been cleared with two remaining in progress.
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Management update on actions taken to address the
issue
Auditor conclusion
In progress Capital Planning
The Council have a history of processing
significant changes to capital budgets during
the financial year. In 2024/25, the capital
budget planned expenditure of £49.662 million,
however following several significant
amendments, the final agreed budget was
£30.268 million. The Council have implemented
a new three year planning approach to capital
in order to manage expenditure over a wider
period.  We have reviewed an advance copy of
the 2025/26 Quarter 1 Capital Monitoring
report. Despite the changes to capital planning,
the issues have continued to arise during
2025/26, with significant changes being made
to the capital budget.
Recommendation:
The Council must ensure that the capital budget
set in advance of the financial year is realistic,
reducing the need for significant budget
amendments in the first months of the financial
year.
There has been greater emphasis on the delivery of
capital plan within committee reports to ensure
Members are provided with sufficient information to
scrutinise underspend. This include the use of a RAG
progress marker and expectation that budget
managers provide a narrative on what has caused the
delay, alongside detail on what actions are being
taken to recover from and mitigate further slippage.
There have also been fewer amendments to the
Capital Plan in 2025/26.
The budget is drafted on best available information as
at that time. An analysis of major slippage reasons are
primarily concerned with strategic decision creating
(member's decision/court of sessions etc/external
partner actions) resulting in project pauses or delays.
As an example, the Moray Growth Deal and Levelling
Up Fund projects are approximately two thirds of the
capital budget in 2025/26. Both programme of works
have tool gates on funding and spend which can lead
to significant capital reprofiling should their
assumptions made at budget setting later change.
The 2025/26 capital budget was significantly
revised during 2025/26. At its maximum, the
budget totalled £73.336 million, however the
final year end outturn was £32.596 million.
While there are mitigating reasons for the
variance; including changes in project scope
and supply chain issues, the Council must
ensure that the capital budget set in advance of
the financial year is realistic, reducing the need
for significant budget amendments.
We note that the Council have implemented a
change in how capital budgets are monitored,
enabling budget holders' access to real time
information and the ability to drill down into
specific project codes, a tool which was not
previously available within capital.
The three-year capital planning approach is in
its infancy, and change will take time. However,
the Council must take appropriate steps to limit
the level of slippage in future years.
Recommendation remains valid.
Revised Target Date: 31 March 2027Page 113

Page 114

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (9)
106
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Management update on actions taken to
address the issue
Auditor conclusion
Closed Management restructure
During 2025, the Council have undertaken a review of the
corporate management structure with a view to adding
capacity to key areas.  The new management structure
went live on 1 September 2025 and recruitment to the
vacant posts is underway.
Successful recruitment to vacant posts will be key in
embedding the revised management structure.  In recent
years, the Council have had recruitment issues and there is
a risk that vacant posts may not be filled which could
impact the level of change the Council are seeking from
the change in structure.
Recommendation:
The Council must ensure that whilst it is actively recruiting
suitable candidates, that plans are in place should they
fail to recruit to key posts.
The Council should review the legal structures that
underpin the changes in the management structure,
including the scheme of delegations and standing orders.
Following implementation of the new structure, the Council
should also perform a standback evaluation to assess
whether the objectives of the new approach were
achieved.
The key recruitment for the revised
corporate management structure is
complete (directors and heads of service).
A suite of recruitments have now been
completed, alongside a corporate
induction programme. In 2026/27 work will
continue on the future workforce which will
include planning and training as well as
cultural improvements across the council.
Service level plans and corporate plans are
measured for success to address
performance targets.
The updated Scheme of Delegation was
approved at Full Council on 3 December
2025.  The Scheme of Administration and
Standing Orders were unaffected by the
management structure change and are
due for their annual review in December
2026.
The Councils Financial Regulations were
approved at Full Council on 6 May 2026 to
reflect the revised management structure.
The Council have completed the
recruitment process for the revised
structure and have begun preparations
for Phase 2, which will focus on service
and team area development aligned
with the new operating model. 
Following the restructure the Council
have reviewed the governance
arrangements and updated governing
documents where appropriate.
The Council have developed a suite of
performance indicators to ensure the
outcomes of the management
restructure are being met, with progress
reporting to Council on an annual basis.
These indicators will be used as a
measure of the restructure's success
going forward.
Recommendation closed.
Page 114

Page 115

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (10)
107
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on actions
taken to address the issue
Update at September 2026
In progress Use of resources – participatory budgeting
Given the financial challenges that lie ahead for
the Council, decisions will need to be made
regarding available financial resource and how it
is allocated and prioritised, which has the
potential to have a knock-on impact on service
delivery.
Recommendation
It is important that the Council undertake more
work around participatory budgeting and ensure
key stakeholders including partners and
individuals are involved within participatory
budgeting exercises to ensure that financial
resources are distributed to priority areas and is
reflecting of priority areas for the local
population
Original Target Date: 31 March 2024
Community planning and engagement is in the
early stages and work to review the role of the
Community Engagement Group for community
planning is ongoing but well progressed.
Workshops were held in February 2024 on the
future design of the leisure service and library
and heritage service to inform proposals on
how these services could operate at a lower
cost in the future. The workshops took a
‘customer at the centre’ style approach.
A guide to mainstream Participatory Budgeting
developed by the Community Support Unit has
been circulated to all services and a workshop
is planned with Council officers in
November/December 2024 to consider
effective approaches to Participatory
Budgeting.
Management Response: Moray Engage has been
launched and used for some consultation.  Work is
underway to review all areas of engagement and
consultation that Moray Council lead on. Work will
commence on developing a community consultation
and engagement strategy which will lay the
foundations for moving forward with the 1%
participatory budgeting. An officer group will be
formed to look at budgets and to move forward in
delivery of the 7 pillars of the Participatory
Budgeting Charter.
Audit Team Conclusion:  The Scottish Government
have a set target that 1% of a local authority’s
budget should be allocated via Participatory
Budgeting. The Council have yet to achieve this
target. As part of its key performance reporting, the
Council are aiming to achieve 100% of the Scottish
Government target. For 2025/26, the Council has
reported that 38.5% of the target has been
achieved. This remains below target levels.
Recommendation remains valid.
Revised Target Date: 31 March 2027
Page 115

Page 116

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (11)
108
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on actions taken to
address the issue
Update at September 2026
Closed Best Value – Workforce analysis reporting
Workforce dashboard data is currently
manually cleansed and uploaded to the
dashboard on a quarterly basis, meaning
that there is room for human error in
cleansing and that data is potentially out of
date on publication.  The equality and
diversity data included in current workforce
reporting is very limited. Workforce data
analysis reports are not shared with Member
committees, who ultimately have to make
decisions on the workforce plan, without
understanding the workforce base.
Recommendation
1. The council should consider the cost and
benefit of having real time workforce data in
dashboards.
2. An initiative to collect and collate diversity
data across the council should be considered
to ensure the council has the best and most
appropriate data on the workforce.
3. Consideration should be given as to
whether workforce analysis reporting should
be extended to Member committees.
Original Target Date: 31 July 2025
1. Review planned to take account of feedback from 12
months of operation of current system. Further
developments required within iTrent, i.e.
implementation of People Manager needed to support
real time reporting. Early work to enable future
development is part of HR/Payroll project due to
commence in early summer and conclude by end of
2025.  Action: Revisit use of real time data following
exploration of required development work in iTrent
(HR/Payroll system).
2. Engagement ongoing and promoted on regular basis
to raise awareness of the importance of diversity data
and ensure employees are provided with information as
to how to update their details in an easily accessible
way. Reference to providing personal data has been
added to induction to help encourage new employees
to share their personal data during the onboarding
period. Further communications to be included in
annual communications plan. Action: Completed
3. Further to reporting in August 2024, Interim
Workforce Report presented to Corporate Committee
on 22 April 2025 with Annual Report due along with
Workforce Strategy and Plan in August 2025.  This
frequency will form the regular reporting cycle going
forwards. Action: Completed
Management Response:
The PSIP continues to be updated. A review of what
workforce data that CLT requires is being carried
out.  Live data dashboards is not possible with the
current software, however data will reviewed more
frequently and presented to CLT quarterly.
Workforce Plan - Progress has focused on
strengthening workforce planning and resourcing
arrangements to support the delivery of key
projects within timescales and budgets.
Recruitment activity has progressed across priority
areas, including the Improving Attendance project,
senior HR and OD roles, and payroll, helping to
build organisational capacity and resilience.
People Management Services has continued to
support services in managing workload and
aligning resource deployment to priority
programmes, ensuring that project delivery is
informed by operational realities.
Audit Team Conclusion: The Council have
confirmed that workforce data is being reviewed
by CLT on a quarterly basis. All actions have been
addressed.
Recommendation closed
Page 116

Page 117

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (12)
109
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on
actions taken to address the issue
Update at September 2026
Closed Best Value – Council-wide reporting
framework
As the council embarks on measures to
transform the way the council works and
achieve a significant savings gap, it is
imperative that progress is monitored
regularly and rigorously at all levels to
ensure objectives are met. Without regular
and rigorous review of performance
measures, the council runs the risk that the
desired objectives are not achieved.
Identifying and setting objective metric
measures will assist in this.
Recommendation
The council should develop a suite of
performance measures, council-wide and
service specific, that should be reported on
regularly with rigorous follow up where
objectives are not met.
Original Target Date: 31 August 2025
The Council's performance
management framework is under
review to ensure that the frequency of
reporting and appropriate committee
for reporting are clear. Service
performance reports follow the themes
in the Council's Corporate Plan. The
Council's committee calendar is being
remodelled to ensure that lead in times
are consistent.  Workforce data
relevant to each service is incorporated
into their services plans. The Council's
public performance report has been
remodelled to be more focused around
the Council's Corporate Priorities. A
programme for PSIF has been
reinstated with agreement on the
services which will carry out this review
process.
Management Response: Updated Performance Management
Framework approved at Corporate Committee 17 Feb 2026. The
update reflects the revised management structure and gives
greater focus to the national and local context. The Council have
service level reports with quarterly and annual updates in place.
The Council have also developed a Transformation Board and
have other Project Boards in place. A saving tracker has also been
developed which is shared at Corporate Leadership Team
meetings on a quarterly basis (and also as part of each revenue
budget monitoring report.  The Public Service Improvement
Framework programme is also on track.
The Committee diary has been revised for the 2026 calendar
year, with the Committee diary updated to allow more lead in
time for reporting.
Audit Team Conclusion: The Council have updated the
Performance Management framework and there is a clear
approach in place to monitor performance across the Council.
This includes LGBF indicators, corporate performance indicators
and service indicators which are reported on an ongoing basis.
Recommendation closed.
Page 117

Page 118

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (13)
110
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on
actions taken to address the issue
Update at September 2026
Closed Transformation - Project monitoring
Quarterly reports are provided to committee for formal
reporting and provide an update of progress on the specific
project areas.  The monitoring reports presented to
Committee could be improved by clearly identifying how
each project links to the Corporate priorities of the Council.
Furthermore, providing additional information relating to the
quantified costs and the projected benefits of each project
would allow for greater scrutiny.  In the current format, the
monitoring report does not provide any context in relation to
the direction of travel of each project or contain benchmarks
on what differentiates a project between green, amber or
red. 
Adding this information to the monitoring reports will provide
members with fuller detail and the ability to provide greater
scrutiny over the projects within the Transformation
Strategy.
Recommendation
The Council should review the content of the reporting
provided to members on the Transformation Strategy. The
Council should ensure the reporting includes an appropriate
level of detail which will provide members with sufficient
detail in order to scrutinise progress and make effective
decisions.
The committee reporting format will be
reviewed to ensure that the appropriate
level of detail is available to committee
Action Owner: Depute Chief Executive
(Education, Communities and
Organisational Development)
Timescale for implementation:
September 2025
Management Response: Embedded.  Most
recent update to Corporate Committee 26 May
2026
Audit Team Conclusion: The Council have
updated the monitoring report so that it clearly
indicates:
- The corporate priority each project relates to
- The target date for completion
- The total expected benefit for each project
- The direction of travel for each project
- The overall RAG status
The body of the report also contains a good
level of detail the current status of each project,
alongside next steps to be taken.
Recommendation closed.
Page 118

Page 119

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (14)
111
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on actions
taken to address the issue
Update at September 2026
Closed Transformation - Future budget plan
Looking ahead into future years, the Council
must ensure that the Transformation Strategy is
the key driver for addressing identified budget
gaps over the longer term. The Council should
not revert to the use of reserves for balancing
the budget.
Recommendation
The Council should ensure that the MTFS is
linked to the overall Transformation Strategy
and is the catalyst for identifying future
efficiencies
The latest iteration of the MTFS includes
linkages to the Transformation Strategy. The
MTFS indicates that the main drivers for
reducing the budget gap are to be found in
the Transformation Strategy, however it
does not specifically state that these drivers
are embedded in the Transformation
Strategy.  This will be clarified in the next
iteration of the Medium to Long Term
Financial Strategy.
Action Owner: Chief Finance Officer
Timescale for implementation: February
2026
Management Response: Embedded. The MTLFS 
reported to Council on 25 Feb 2026 includes a section
on Transformation Strategy (Section 6. Supporting
Change Programmes). Specific reference is made to
individual projects within the Transformation Strategy.
Audit Team Conclusion: The MTLFS contains clear links
to the Transformation Strategy, with transformation
noted as a key change programme within the MTLTS.
The MTLFS notes that the Transformation Strategy will
be used to deliver structural change through service
redesign, digital improvement and reduction of the
Council’s asset base.
Recommendation closed.
Page 119

Page 120

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (15)
112
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on
actions taken to address the issue
Update at September 2026
Closed Transformation - Annual report on transformation
There are a number of transformational projects
ongoing outwith the regular reporting cycle for the
Transformation Strategy. For assurance purposes,
the Council should review its overall reporting on
transformation and produce an annual report
which brings all projects the Council consider as
transformational into one document to members.
Recommendation
The Council should prepare an annual report
which provides a progress update on all
transformation projects.
All transformation work is now captured
within the Transformation Strategy and
the Moray Growth Deal programme. 
Both are extensive programmes of work
that would be very large within a single
annual report. 
Annual reporting for the Transformation
Strategy will be aligned with the annual
reporting for MGD from 2026 forward.
Action Owner: Executive Director
(Finance, Strategy & Transformation)
Timescale for implementation: June
2026
Management Response: Embedded.  Best value action
progress is reported quarterly to Corporate Committee
(last meeting 17 Feb 2026) and interim strategy
development update reported 26 May 2026, with end of
year report expected to be presented to Corporate
Committee Aug 2026. Moray Growth Deal Annual Report
to Corporate Committee Aug 2026.  All transformation
reports considered in unity.
Major strands currently underway include: Future
Workforce Planning, Smarter Working (Phase 3), Depots
and Stores Review, Just Transition, Moray Growth Deal,
Update of Customer Records Management software,
Digital Transformation.
Audit Team Conclusion: The reporting to the August
2026 Corporate Committee provides a status overview
of all transformation projects, including a detailed
progress updated, current issues impacting project
delivery and next steps.
Recommendation closed.
Page 120

Page 121

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (16)
113
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on actions
taken to address the issue
Update at September 2026
Closed Transformation - Delivery timetable from
transformation projects
Updates on the progress of the projects
included within the Transformation Strategy
are reported quarterly to the Corporate
Committee. The most recent update confirmed
that there are several projects which are now
behind schedule and the Council will need to
consider whether the initial timetable for these
projects is still attainable.
Recommendation
The Council should put in place a rolling
schedule of timetable review for projects to
confirm they remain achievable, ensuring that
when delays occur, the Council is sighted on
the delay and can put in place appropriate
actions
The report to the Corporate Committee on
10 June 2025 noted the reasons for projects
being behind timescale and the remedies
proposed.  The last overall review of all
projects within the programme was
undertaken as part of the refresh and
refocus of the programme reported to the
Council on 13 August 2024. Consideration
will be given to the timing and continuation
of the current set of projects as Stage 3 of
the Transformation Strategy is prepared for
reporting in the autumn of 2025.
Action Owner: Depute Chief Executive
(Education, Communities and
Organisational Development)
Timescale for implementation: December
2025
Management Response: Stage 3 of the Transformation
Strategy was approved at Council 24 September 2025.
All updates to Transform board set out where projects
are on schedule and focus is on projects rated amber
and red on how to return to green status.
Audit Team Conclusion: The reporting to the August
2026 Corporate Committee provides a status overview
of all transformation projects, including a detailed
progress updated, current issues impacting project
delivery and next steps.
Each project is given a RAG rating to confirm whether it
is still meeting objectives, if it is on budget and on
schedule.
Recommendation closed.
Page 121

Page 122

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (17)
114
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on actions
taken to address the issue
Update at September 2026
Closed Reporting of outcomes
The Council prepare End of Project reports
which provides full detail on the outcome of
projects.  These reports are comprehensive and
provide context on the outcomes of projects,
including whether the project has achieved
predicted financial or service delivery benefits.
These reports are not currently presented to
members for oversight.
Recommendation
The Council should report the high-level
outcomes of completed transformation projects
to members.
Outcomes from end of project reports and
interim project learning reports will be
reported to committee
Action Owner: Project Owner
Timescale for implementation: As projects
conclude
Management Response:
Transform Board information is shared with members
rather than only giving a short narrative in the report to
Committee. Examples include Energy from Waste,  Out
of House Project and Smarter Working closuring reports.
Councillor briefings sessions provide additional project
information, which are collaborative sessions where
elected members can ask more detailed questions to the
project management team.
Audit Team Conclusion: The End of Project reports are
now presented in private to members at Council
meetings. Furthermore, members are well sighted on
outcomes via the member briefing sessions which
enables time for challenge and scrutiny.
Recommendation closed.
Page 122

Page 123

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (18)
115
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on actions
taken to address the issue
Update at September 2026
Closed Workforce capacity
The Council recognise capacity is a significant
barrier,  and the rural nature of Moray adds to
complexity when recruiting.  The Council are
undertaking a corporate management review
which will consider how to ensure the Council is
appropriately resourced moving forward, with
a view to implementation of approved changes
by August 2025.
Recommendation
The Council should implement the agreed
changes to the corporate management
structure and commit to reviewing and
refreshing as appropriate in future years.
The Council should ensure it has appropriate
capacity at senior levels, ensuring the Council
has the correct mix of skill and experience, to
support the Council in its transformation
journey.
Management structure changes will be
implemented.
Action Owner: Chief Executive
Timescale for implementation: September
2025
Management Response:
Management structure Phase 1 has been completed
September 2025. All first and second tier posts now
successfully appointed as of 31 March 2026. The Council
had good completion of the Phase 1 recruitment which
included an agile approach for working at Moray
Council attracting top talent from a wider talent pool.
Audit Team Conclusion: The Council have implemented
the agreed changes to the corporate management
structure and have completed a successful recruitment
process to ensure roles all are filled.
Phase 2 of the restructure will begin shortly, which will
focus on middle-management recruitment.
Recommendation closed.
Page 123

Page 124

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (19)
116
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on actions
taken to address the issue
Update at September 2026
In progress Delivery of transformation programme
An officer group is refreshing programme
governance to ensure that while all necessary
due diligence is completed, this is done in an
effective and efficient manner. The Council
have several transformation projects in
development, however there is a risk that too
much time is being spent on developing plans
which is taking away focus from
implementation. As part of the governance
refresh, the Council need to ensure there is an
appropriate balance between planning and
delivery to ensure transformation of services
can be delivered at the correct pace.
Recommendation
The Council need to find the correct balance
between planning and delivery to ensure
transformation of services can be delivered at
the correct pace.
Project governance will be reviewed.
Action Owner: Executive Director (Finance,
Strategy & Transformation)
Timescale for implementation: March 2026
Management Response:
Underway.  Best value action progress is reported
quarterly to the Corporate Committee.
A light touch review was completed during 2025/26, and
a revised Programme and Project Board Roles and
Responsibilities schedule was approved. Key role of the
Transformation Board is 'Ensure programme delivers
outcomes, tracking progress; cost/organisational
impact/change is embedded/benefits realised’.
Audit Team Conclusion: The Council has started its
transformation journey and has taken steps to establish
the foundations required for change. However, the
programme remains ongoing, and continued focus will
be needed to strike the right balance between planning
and delivery. Maintaining this balance will be critical to
ensuring that service transformation is implemented at
an appropriate pace, delivers intended benefits, and
remains responsive to emerging challenges and
opportunities.
Recommendation remains valid.
Revised Target Date: 31 October 2027 (however the
Council consider this ongoing work)
Page 124

Page 125

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Follow up of prior year recommendations (20)
117
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Previous management update on actions
taken to address the issue
Update at September 2026
Closed Approach to digital
The Council recognise that the scale and extent
of digital development that is required to
support transformation as well as digital
maturity is extensive. There are a range of IT
systems and integration, and the current ICT
architecture presents challenge due to a lack of
integrated systems. The Council is monitoring
work being undertaken through the
Improvement Service and COSLA to identify
key lessons and points for local development.
The Council understand that digital will be an
integral part of transformation in future years.
Recommendation
The Council should formalise the approach to
digital and set this out in a Digital Strategy for
presentation to members. The Digital Strategy
should be linked to transformation and be one
of the Council’s key policies
Digital services is included within the
Transformation Strategy and work is well
progressed towards reporting the Digital
Strategy to committee in September 2025.
Action Owner: Depute Chief Executive
(Education, Communities and
Organisational Development)
Timescale for implementation: September
2025
Management Response:
The Digital Strategy was approved by the Corporate
Committee in August 2025.
Plan in place to bring digital solutions for an
organisation wide sharepoint online solution. The
Council are looking at a new Electronic Document and
Records Management System (EDRMS), a Care Records
Management (CRM) replacement, a website rebuild, as
well as improvements in the use of iTrent (payroll system)
and programme of works to update FMS (ledger system). 
All of which move us towards our digital strategy,
particularly allowing for improvements through the use
of AI / Microsoft Co-Pilot.
Audit Team Conclusion: The Council have formalised the
approach to digital and approved the Digital Strategy.
The Digital Strategy has clear links to the Transformation
Strategy, and success measures relating to digital
transformation projects will be monitored through the
Transform Board as part of the Transformation Strategy.
Recommendation closed.
Page 125

Page 126

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
F. Audit fees, ethics and independence
118
Independence and ethics
We confirm that there are no significant facts or matters that impact on our independence as auditors that we are require or wish to draw to your attention and
consider that an objective reasonable and informed third party would take the same view. We have complied with the Financial Reporting Board’s Ethical Standard
and confirm that we, as a firm, and each covered person, are independent and are able to express an objective opinion on the financial statements.
We confirm that we have implemented policies and procedures to meet the requirement of the Financial Reporting Board’s Ethical Standard.
Ethical Standards and ISA (UK) 260 require us to give you timely disclosure of all significant matters that may bear upon the integrity, objectivity, and independence
of the firm or covered persons (including its partners, senior managers, managers and network firms). In this context, there are no independence matters that we
would like to report to you.
As part of our assessment of our independence we note the following matters:
Matter Conclusion
Relationship with Grant Thornton We are not aware of any relationships between Grant Thornton and Moray Council that
may reasonably be thought to bear on our integrity, independence and objectivity
Relationships and investments held by individuals We have not identified any potential issues in respect of personal relationships with the
Group or investments in the Group held by individuals
Employment of Grant Thornton staff We are not aware of any former Grant Thornton partners or staff being employed, or holding discussions
in respect of employment, by the Group as a director or in a senior management role covering financial,
accounting or control related areas.
Business relationships We have not identified any business relationships between Grant Thornton and the Group.
Contingent fees in relation to non-audit services No contingent fee arrangements are in place, note that there are no non-audit services provided.
Gifts and hospitality We have not identified any gifts or hospitality provided to, or received from, a member of the Group’s
board, senior management or staff.
Page 126

Page 127

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
F. Audit fees, ethics and independence (2)
119
Fees and non-audit services
The tables on the following page set out the total fees for audit and other services charged from the beginning of the financial year to the current date, as well as the
threats to our independence and safeguards have been applied to mitigate these threats. None of the below services were provided on a contingent fee basis.
For the purposes of our audit we have made enquiries of all Grant Thornton teams within the Grant Thornton International Limited network member firms providing
services to Moray Council. The table summarises all non-audit services which were identified.
The final audit fee includes additional audit fee of £42,780, which has been agreed with the Executive Director Finance, Strategy & Transformation. The following
additional audit procedures were carried out as part of our 2025/26 audit:
• Non-current asset valuations: additional work was needed following the late receipt of the Council Dwellings valuation in August 2026 and the resulting prior
period amendment. This required liaison with the VOA to understand their methodology and its differences from the Council's previous approach, confirmation
that the previous valuation had been incorrect, review of the Council's updated values to confirm correct input into the accounts, and consultation with GT's audit
approach, financial reporting and valuation teams to conclude the work.
• Land and buildings valuations: took longer than planned due to a high level of engagement with the valuer, requiring additional auditor time to work through a
significant number of queries.
• Nether Dallachy landfill provision: additional audit procedures were required following audit challenge, including detailed review of management's calculations
supporting the new provision recognised in the 2025/26 financial statements.
• Auditing standards and Accounting standards: the previous introduction of ISA 600 and updated IFRS 16 requirements resulted in additional audit testing during
both planning and year-end procedures for 2025/26.
• Follow-up of prior recommendations: the audit plan identified the need to follow up previous audit recommendations across both the financial statements audit
and wider scope responsibilities, with the wider scope audit requiring increased scrutiny and reporting due to historical issues and the number of significant areas
of focus identified during the year.
The Annual Audit Report will be considered by the Council on 30 September 2026 including agreement of audit fees.
Page 127

Page 128

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
F. Audit fees, ethics and independence (3)
120
Fees and non-audit services
* This includes the additional fee of £42,780 with the reasons as already noted
set out on page 119.
External audit fee Fees for other non-audit services
Service
Planned
Fees
Final
Fees
External Auditor Remuneration £253,050 £295,830
Pooled Costs £8,730 £8,730
Contribution to Performance Audit and Best Value £59,470 £59,470
Sectoral cap adjustment (£2,440) (£2,440)
2025/26 Initial Fee (informed by Audit Scotland) £318,810 £361,590
Trust Fund Charity (not covered in the initial fee) £7,500 £7,500
2025/26 Audit Fee £326,310 £369,090
Service Fees £
We confirm that for 2025/26 we did not
receive any fees for non-audit services
Nil
The fees reconcile to the financial statements (round £’000 in the financial
statements):
• Fees per financial statements  £369,000
• Total fees as above  £369,090
The final audit fee reconciles to the initial Audit Scotland planned fee
as follows:
• Audit Scotland initial fee  £318,810
• Trust Fund Charity fee  £7,500
• Additional audit fee  £42,780
• Final audit fee   £369,090
This covers all services provided by us and our network to the Council,
its directors and senior management and its affiliates, that may
reasonably be thought to bear on our integrity, objectivity or
independence.
Page 128

Page 129

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
G. Client Service Review
121
Client service
We take our client service seriously and continuously seek your feedback on our external audit service. Should you feel our service falls short of expected standards
please contact Joanne Brown, Head of Public Sector Assurance Scotland in the first instance who oversees our portfolio of Audit Scotland work
(joanne.e.brown@uk.gt.com). Alternatively, should you wish to raise your concerns further please contact Mark Stocks, Partner, 8 Finsbury Circus, London, EC2M
7EA. If you feedback relates to audit quality and we have not successfully resolved your concerns, your concerns should be reported to John Gilchrist, Audit Scotland
Quality and Appointments in accordance with the Audit Scotland audit quality complaints process.
Transparency
Grant Thornton publishes an annual Transparency Report, which sets our details of the action we have taken over the past year to improve audit quality as well as
the results of internal and external quality inspections. For more details see 2025-transparency-report.pdf.
Grant Thornton publishes an annual Audit Quality Report, which sets out details of the actions we have taken over the past year to meet our audit quality framework
and provides a forward look on our plans for the future. For more details see audit-quality-report-2026-final.pdf.
Page 129

Page 130

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
H. Communication of audit matters with those charged
with governance
The Audit Findings Report 122
RECOMMENDED CONTENT –
entities OTHER THAN PIEs
Guidance note
The requirements here are
relevant to entities that are not
PIEs.
For PIEs, delete the slide.
Red text may not be applicable
and should be either deleted or
amended as appropriate.
ISA (UK) 260, as well as other ISAs (UK), prescribe matters which we are required to communicate with those charged with
governance, and which we set out in the table here.
This document, the Audit Findings, outlines those key issues, findings and other matters arising from the audit, which we consider
should be communicated in writing rather than orally, together with an explanation as to how these have been resolved.
Respective responsibilitiesAs auditor we are responsible for performing the audit in accordance with ISAs (UK),
which is directed towards forming and expressing an opinion on the financial statements that have been
prepared by management with the oversight of those charged
with governance.
The audit of the financial statements does not relieve management or those charged with governance of their responsibilities.
Distribution of this Audit Findings report
Whilst we seek to ensure our audit findings are distributed to those individuals charged with governance, as a minimum a
requirement exists for our findings to be distributed to all the company directors and those members of senior management with
significant operational and strategic responsibilities. We are grateful for your specific consideration and onward distribution of our
report, to those charged with governance.
Our communication plan Audit Plan Audit Findings
Respective responsibilities of auditor and management/those charged with governance 
Overview of the planned scope and timing of the audit, form, timing and expected general content of communications
including significant risks 
Confirmation of independence and objectivity  
A statement that we have complied with relevant ethical requirements regarding independence. Relationships and other
matters which might be thought to bear on independence. Details of non-audit work performed by Grant Thornton UK
LLP and network firms, together with fees charged. Details of safeguards applied to threats to independence
 
Significant matters in relation to going concern  
Views about the qualitative aspects of the Group’s accounting and financial reporting practices including accounting
policies, accounting estimates and financial statement disclosures 
Significant findings from the audit 
Significant matters and issue arising during the audit and written representations that have been sought 
Significant difficulties encountered during the audit 
Significant deficiencies in internal control identified during the audit 
Significant matters arising in connection with related parties 
Page 130

Page 131

|© 2026 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Our communication plan Audit Plan Audit Findings
Identification or suspicion of fraud involving management and/or which results in material misstatement of the financial
statements 
Non-compliance with laws and regulations 
Unadjusted misstatements and material disclosure omissions 
Expected modifications to the auditor's report, or emphasis of matter 
H. Communication of audit matters with those charged
with governance
The Audit Findings 123
RECOMMENDED CONTENT –
entities OTHER THAN PIEs
Guidance note
The requirements here are
relevant to entities that are not
PIEs.
For PIEs, delete the slide.
Red text may not be applicable
and should be either deleted or
amended as appropriate.
ISA (UK) 260, as well as other ISAs (UK), prescribe matters which we are required to communicate with those charged with governance, and which we set out in
the table here.
This document, the Annual Audit Report, outlines those key issues, findings and other matters arising from the audit, which we consider should be communicated
in writing rather than orally, together with an explanation as to how these have been resolved.
Respective responsibilities
As auditor we are responsible for performing the audit in accordance with ISAs (UK), which is directed towards forming and expressing an opinion on the financial
statements that have been prepared by management with the oversight of those charged with governance.
The audit of the financial statements does not relieve management or those charged with governance of their responsibilities.
Distribution of this Annual Audit Report
Whilst we seek to ensure our audit findings are distributed to those individuals charged with governance, as a minimum a requirement exists for our findings to
be distributed to all members and those members of senior management with significant operational and strategic responsibilities. We are grateful for your
specific consideration and onward distribution of our report, to those charged with governance.
Page 131

Page 132

© 2026 Grant Thornton UK LLP. All rights reserved.
‘Grant Thornton’ refers to the brand under which the Grant Thornton member firms provide assurance, tax and advisory services to their clients and/or refers to one or
more member firms, as the context requires. Grant Thornton UK LLP is a member firm of Grant Thornton International Ltd (GTIL). GTIL and the member firms are not a
worldwide partnership. GTIL and each member firm is a separate legal entity. Services are delivered by the member firms. GTIL does not provide services to clients. GTIL
and its member firms are not agents of, and do not obligate, one another and are not liable for one another’s acts or omissions."
GUIDANCE NOTES:
Please ensure every
presentation has a back
page with disclaimer
Page 132

Page 133

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director, Finance, Strategy and Transformation  
Author: Jon Matthews Contact Email: jon.matthews@moray.gov.uk 
Subject: Moray Council’s Audited Annual Accounts for the period 1 April 2025 to
31 March 2026 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to submit to the Council the Audited Annual Accounts for the
Moray Council for the year ended 31 March 2026.  
1.2 This report is submitted to the Council for consideration as a suite of reports on the
Annual Audit and Accounts for 2025/26.  
1.3 This report is submitted to Council in terms of Section III (B) (16) of the Council’s Scheme
of Administration relating to keeping accounts for the proper recording of all transactions
of the Council and to audit such accounts.  
2. REASON FOR URGENCY  
2.1 This report is submitted to Council in terms of the Local Government (Access to
Information) Act 1985, on the Chair certifying that, in her opinion it requires to be
considered on the grounds of urgency in order to give early consideration to statutory
deadlines under The Local Authority Accounts (Scotland) Regulations 2014 which requires
annual accounts to be approved and published by 30 September each year.  
3. SUMMARY  
3.1 This report provides the audited Annual Accounts for Moray Council for the period 1 April
2025 to 31 March 2026.  
4. RECOMMENDATIONS 
4.1 It is recommended that Council:   
Item 7b.
Page 133

Page 134

i)  Consider and note the Audited Annual Accounts for the financial year
2025/26; and 
ii)  Approve that the Annual Accounts and Letter of Representation are signed,
having regard to the Annual Report from the external auditor which is another
item on this agenda. 
Jon Matthews
Executive Director, Finance, Strategy and Transformation (Section 95 OƯicer)  
5. BACKGROUND AND CONTEXT  
5.1 The unaudited Annual Accounts were submitted to a meeting of Moray Council on 30 June
2026 (paragraph 12 of the Minute refers).  Delegated authority was granted to the Section
95 OƯicer to issue a second set of draft accounts following completion of the Council
Dwellings valuation, and that was done on 30 August 2026. 
5.2 These accounts are prepared in accordance with the Code of Practice on Local Authority
Accounting in the United Kingdom 2020/21 (the Code) which is underpinned by
International Financial Reporting Standards (IFRS). They summarise the Council’s
financial transactions for the year to 31 March 2026. 
5.3 The Code requires the Council to set out a statement not only of its own financial position
but also of the financial position of all the entities or activities for which the Council is
responsible or in which it has a significant financial interest. These entities are
encompassed in the Group Accounts, which are included in the Annual Accounts. The
Group Accounts for 2025/26 include Trust Funds and Common Good Funds as entities or
activities for which the Council is responsible and the Moray Integration Joint Board,
Grampian Valuation Joint Board and Moray Leisure Limited as associate bodies.  
5.4 The Local Authority Accounts (Scotland) Regulations 2014 require local authorities to
prepare and submit their draft annual accounts to the auditor by 30 June following the end
of the financial year. These accounts must then be approved and published by 30
September, unless an extension is granted by statutory instrument.  
6. PROPOSALS  
6.1 A copy of the Audited Annual Accounts for 2025/26 is available as another meeting
document on this agenda. The signed accounts will be posted to the Council’s website
following this meeting.  
6.2 As a result of the audit process some amendments have been made to the Core
Statements and these are described as follows.  
6.3 A prior period adjustment has been recognised in respect of Council Dwellings following
the identification of an error in the valuation methodology applied during 2020/21. The
error was identified through a review of valuation information contained within the
2025/26 valuation report and resulted in the value of Council Dwellings being misstated in
the 2020/21 accounts, with the misstatement subsequently being carried forward into
subsequent financial years. The correction has resulted in a reduction in the value of
Page 134

Page 135

Property, Plant and Equipment (PPE) of £194.2 million in 2023/24, with a corresponding
reduction in the Revaluation Reserve. As the adjustment relates solely to the Revaluation
Reserve, which is an unusable reserve, there is no impact on usable reserves, cash
balances, or the Council's overall financial position going forward.  
6.4 An amendment related to Other Land and Buildings has been made. Valuations included
in the Valuers Report had been incorrectly input into the Fixed Asset Register and
subsequently the PPE – Other Land and Buildings balance. This resulted in PPE – Other
Land and Building being overstated. The overall impact on the financial statements was a
decrease to PPE – Other Land and Buildings of £2.3 million and a decrease to the
Revaluation Reserve of £2.3 million. As the adjustment relates solely to the Revaluation
Reserve, which is an unusable reserve, there is no impact on usable reserves, cash
balances, or the Council's overall financial position going forward. 
6.5 An amendment related to the inclusion of a provision for aftercare at Nether Dallachy
landfill site has been made. This was previously recognised as a contingent liability, which
did not require a value to be stated. The overall impact on the financial statements was an
increase to provisions of £6.0 million and an increase to the other service expenditure of
£6.0 million. Whilst this adjustment is recognised in the Comprehensive Income and
Expenditure Statement, it is reversed through the Movement in Reserves Statement in
accordance with statutory accounting requirements. Consequently, there is no impact on
usable reserves, cash balances, or the Council's budget position going forward. 
6.6 An amendment related to the measurement of the right of use asset and lease liabilities
for the Private Finance Initiative (PFI) schemes has been made.  This was a result of an
error processed in the calculation adjustment in 2024/25 as part of the transition
adjustment to IFRS 16 Leases. The overall impact on the financial statements was a
decrease to the Right of Use asset of £6.0 million and a decrease to the Lease Liability of
£6.0 million. This has no impact on usable reserves, cash balances, or the Council's
overall financial position going forward. 
6.5 Other minor amendments related to the notes to the accounts have been made. In total,
there have been no amendments made as a result of the audit to the Council’s usable
reserves.  
6.6 The External Auditors have given the Council an unqualified opinion in the Independent
Auditors’ Report, which can be found on pages 133 - 136 of the Accounts. 
6.7 In accordance with audit requirements, the Council is asked to approve the Letter of
Representation (APPENDIX 1) prior to the completion of the external audit. The Letter of
Representation provides formal confirmation from management that it has fulfilled its
responsibilities for the preparation of the financial statements, has made available all
relevant information and records requested by the auditor, and has disclosed all matters
that could have a material impact on the financial statements. The letter forms part of the
audit evidence obtained by the external auditor and is a standard requirement of the audit
process.    
7. SUMMARY OF IMPLICATIONS  
Page 135

Page 136

7.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal ✓ 
Financial ✓ 
Risk ✓ 
StaƯing ✓ 
Best Value and Transformation  ✓
Property  ✓
Information Communications Technology/Digital             ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change and Biodiversity Impact  ✓ 
7.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
There are no direct links between the audit process and the Council’s Corporate Plan.   
7.3 Policy and Legal 
According to Paragraph (1) of the Local Authority Accounts (Scotland) Regulations 2014, a
Local Authority is required to submit its Audited Accounts to the Council each year and
state that a local authority must meet to consider the Audited Accounts and aim to
approve them no later than 30 September immediately following the financial year to
which they relate.   Due to the audit not being complete by 30 September 2024 publication
of the accounts has been delayed. 
The review by the External Auditors of the Council’s Accounts is in accordance with the
Council’s Code of Corporate Governance and ensures that the Council complies with
established policies, procedures, laws and regulations.  
7.4 Financial
Page 136

Page 137

Amendments to the accounts were identified as part of the audit process. There was no
impact on usable reserves. 
7.5 Risk 
There are no risk issues arising directly from this report. The work undertaken by Audit
Scotland provides assurance to the Committee that the Accounts for 2025/26 give a true
and fair view of the financial position and expenditure and income of the Council and its
group for the year.  
7.6 StaƯing 
Many staƯ throughout the Council provide information for the inclusion in the Annual
Accounts.  
7.7 Best Value and Transformation 
There are no implications for Best Value and Transformation arising from this report.  
7.8 Property 
There are no property issues arising directly from this report.  
7.9 Information Communications/Technology/Digital 
There are no implications for information, communications, technology or digital arising
directly from this report.  
7.10 Equalities, Social Inclusion and Economic Impact  
Does the proposal have the
potential to aƯect people from the
below categories diƯerently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - The Annual Accounts are a retrospective statement of the Council’s
financial performance and do not, in themselves, result in any change to services or
policy. Accordingly, no direct impacts on equalities, social inclusion, or the economy
have been identified
Page 137

Page 138

7.11 Climate Change and Biodiversity Impacts 
There are no climate change and biodiversity issues arising from this report.  
8. CONSULTATION  
8.1 Finalising the Accounts does not involve consultation, but many staƯ throughout the
Council are involved in providing information for inclusion in the Accounts.  
9. BACKGROUND PAPERS  
9.1 Held by Accountancy section.   
Page 138

Page 139

Finance, Strategy & Transformation
Jon Matthews
Executive Director 
Moray Council
Council Office Elgin Moray IV30 1BX
Telephone: 01343 563915 
Grant Thornton UK LLP
Level 8
120 Bothwell St
Glasgow
G2 7JS 
email:  Jon.Matthews@moray.gov.uk
Website: www.moray.gov.uk  
Your reference: 
Our reference: JM/JF/LJC/     
Dear Grant Thornton UK LLP 
Moray Council
Financial Statements for the year ended 31 March 2026 
This representation letter is provided in connection with the audit of the financial
statements of Moray Council (the “Council”) and its subsidiary undertakings
Grampian Valuation Joint Board, Moray Integration Joint Board, Moray Leisure Trust,
the Trust Funds and Common Goods (the “group”), for the year ended 31 March
2026 for the purpose of expressing an opinion as to whether the group and Council
financial statements give a true and fair view in accordance with International
Financial Reporting Standards and the CIPFA/LASAAC Code of Practice on Local
Authority Accounting in the United Kingdom 2025/26 and applicable law. 
We confirm that to the best of our knowledge and belief having made such inquiries
as we considered necessary for the purpose of appropriately informing ourselves: 
Financial Statements 
i. We have fulfilled our responsibilities, as set out in International Financial
Reporting Standards and the CIPFA/LASAAC Code of Practice on Local
Authority Accounting in the United Kingdom 2025/26 ("the Code"); in particular
the financial statements are fairly presented in accordance therewith. 
ii. We have complied with the requirements of all statutory directions affecting
the group and Council and these matters have been appropriately reflected
and disclosed in the financial statements. 
iii. The Council has complied with all aspects of contractual agreements that
could have a material effect on the group and Council financial statements in
the event of non-compliance. There has been no non-compliance with
requirements of any regulatory authorities that could have a material effect on
the financial statements in the event of non-compliance.
Page 139

Page 140

iv. We acknowledge our responsibility for the design, implementation and
maintenance of internal control to prevent and detect fraud. 
v. Significant assumptions used by us in making accounting estimates, including
those measured at fair value, are reasonable. We are satisfied that the
material judgements used in the preparation of the financial statements are
soundly based, in accordance with the Code and adequately disclosed in the
financial statements. We understand our responsibilities includes identifying
and considering alternative, methods, assumptions or source data that would
be equally valid under the financial reporting framework, and why these
alternatives were rejected in favour of the estimate used. We are satisfied that
the methods, the data and the significant assumptions used by us in making
accounting estimates and their related disclosures are appropriate to achieve
recognition, measurement or disclosure that is reasonable in accordance with
the Code and adequately disclosed in the financial statements. 
vi. We confirm that we are satisfied that the actuarial assumptions underlying the
valuation of pension scheme assets and liabilities for International Accounting
Standard 19 Employee Benefits disclosures are consistent with our
knowledge. We confirm that all settlements and curtailments have been
identified and properly accounted for. We also confirm that all significant post-
employment benefits have been identified and properly accounted for. 
vii. Except as disclosed in the group and Council financial statements: 
a. there are no unrecorded liabilities, actual or contingent; 
b. none of the assets of the group and Council has been assigned,
pledged or mortgaged; and 
c. there are no material prior year charges or credits, nor exceptional or
non-recurring items requiring separate disclosure. 
viii. Related party relationships and transactions have been appropriately
accounted for and disclosed in accordance with the requirements of
International Financial Reporting Standards and the Code. 
ix. All events subsequent to the date of the financial statements and for which
International Financial Reporting Standards and the Code require adjustment
or disclosure have been adjusted or disclosed. 
x. We have considered the unadjusted misstatements schedule included in your
Annual Audit Report and attached to this letter. We have not adjusted the
financial statements for these misstatements brought to our attention as they
are immaterial to the results of the group and Council and its financial position
at 31 March 2026. The financial statements are free of material
misstatements, including omissions. 
Page 140

Page 141

xi. Actual or possible litigation and claims have been accounted for and disclosed
in accordance with the requirements of International Financial Reporting
Standards.   
xii. We have no plans or intentions that may materially alter the carrying value or
classification of assets and liabilities reflected in the financial statements. 
xiii. The prior period adjustments disclosed in the financial statements are
accurate and complete. There are no other prior period errors to bring to your
attention. 
xiv. We have updated our going concern assessment. We continue to believe that
the group and Council’s financial statements should be prepared on a going
concern basis and have not identified any material uncertainties related to
going concern on the grounds that: 
a. the nature of the group and Council means that, notwithstanding any
intention to cease the group and Council operations in their current
form, it will continue to be appropriate to adopt the going concern basis
of accounting because, in such an event, services it performs can be
expected to continue to be delivered by related public authorities and
preparing the financial statements on a going concern basis will still
provide a faithful representation of the items in the financial statements 
b. the financial reporting framework permits the Council to prepare its
financial statements on the basis of the presumption set out under a)
above; and 
c. the group and Council’s system of internal control has not identified
any events or conditions relevant to going concern. 
We believe that no further disclosures relating to the group and Council's
ability to continue as a going concern need to be made in the financial
statements 
xv. The group and Council has complied with all aspects of ring-fenced grants
that could have a material effect on the group and Council’s financial
statements in the event of non-compliance. 
Information Provided 
xvi. We have provided you with: 
a. access to all information of which we are aware that is relevant to the
preparation of the group and Council’s financial statements such as
records, documentation and other matters; 
b. additional information that you have requested from us for the purpose
of your audit; and 
Page 141

Page 142

c. unrestricted access to persons within the group and Council from
whom you determined it necessary to obtain audit evidence. 
xvii. We have communicated to you all deficiencies in internal control of which
management is aware. 
xviii. All transactions have been recorded in the accounting records and are
reflected in the financial statements. 
xix. We have disclosed to you the results of our assessment of the risk that the
financial statements may be materially misstated as a result of fraud. 
xx. We have disclosed to you all information in relation to fraud or suspected
fraud that we are aware of and that affects the group and Council, and
involves: 
a. management; 
b. employees who have significant roles in internal control; or 
c. others where the fraud could have a material effect on the financial
statements. 
xxi. We have disclosed to you all information in relation to allegations of fraud, or
suspected fraud, affecting the financial statements communicated by
employees, former employees, analysts, regulators or others. 
xxii. We have disclosed to you all known instances of non-compliance or
suspected non-compliance with laws and regulations whose effects should be
considered when preparing financial statements. 
xxiii. We have disclosed to you the identity of the group and Council's related
parties and all the related party relationships and transactions of which we are
aware. 
xxiv. We have disclosed to you all known actual or possible litigation and claims
whose effects should be considered when preparing the financial statements. 
Annual Governance Statement 
xxv. We are satisfied that the Annual Governance Statement (AGS) fairly reflects
the Council's risk assurance and governance framework and we confirm that
we are not aware of any significant risks that are not disclosed within the
AGS. 
Page 142

Page 143

Management Commentary 
xxvi. The disclosures within the Management Commentary fairly reflect our
understanding of the group and Council's financial and operating performance
over the period covered by the financial statements. 
Approval 
The approval of this letter of representation was minuted by full Council at its
meeting on 30 September 2026. 
Yours faithfully 
Name: Jon Matthews 
Position: Executive Director Finance, Strategy and Transformation 
Date: 
Signed on behalf of Moray Council 
Page 143

Page 144

Appendix I
Unadjusted misstatements 
Page 144

Page 145

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Finance, Strategy and Transformation  
Author: Audrey Boyd Contact Email: audrey.boyd@moray.gov.uk 
Subject: Moray Council’s Connected Charities’ Audited Annual Accounts for the
period 1 April 2025 – 31 March 2026 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to submit to the Council the audited Annual Accounts for
Moray Council’s Connected Charities for the year ended 31 March 2026.  
1.2  This report is submitted to Council in terms of Section III B (20) of the Council’s Scheme of
Administration relating to the management and investment of any funds including
Common Good Funds and Trust Funds, under the control of the Council.  
2.  SUMMARY  
2.1  This report provides the audited Annual Accounts for Moray Council’s Connected
Charities for the year ended 31 March 2026.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Council considers and approves both the audited Annual
Accounts for the Connected Charities and Letter of Representation for the financial
year 2025/26.   
Audrey Boyd
Accountant 
4.  BACKGROUND AND CONTEXT  
Item 7c.
Page 145

Page 146

4.1  Moray Council (all 26 councillors) acts as sole trustee for the administration of 30 small
charitable trusts, which are all registered with the OƯice of the Scottish Charities
Regulator (OSCR).    
4.2  Section 106 of the Local Government (Scotland) Act 1973 applies the accounting and
auditing requirement of the Act to any trust fund where an authority or some members of
the authority are the sole trustees. As section 106 requires an audit, the appointments of
local authority auditors include the provision of an auditor’s report for charitable funds
covered by that section.  
4.3  Regulation 7 of the Charities Accounts (Scotland) Regulations permits charities that have
a common purpose or shared management to prepare a single set of “connected
charities” accounts. Moray Council acts as sole trustee to 30 individual small charitable
trusts. On the basis of this shared management arrangement, it has been agreed with the
Council’s auditors that the financial result of the 30 individual small charitable trusts can
be consolidated into a single set of accounts for audit purpose. 
4.4  A copy of the Connected Charities Audited Annual Accounts for 2025/26 is attached as
APPENDIX 1 to this report. 
4.5  The audit process highlighted identified no changes to the financial information contained
in the Annual Accounts and therefore there has been no change in the balances held.  Minor
presentational amendments have been made. 
4.6  The External Auditors have given the Council an unqualified opinion in the Independent
Auditors’ Report, which can be found on pages 16-17 of the Accounts, which means the
audited financial statements give a true and fair view of the financial position and
expenditure and income of the council’s Connected Charities for the year.  
4.7  In accordance with audit requirements, the Council is asked to approve the Letter of
Representation (APPENDIX 2) prior to the completion of the external audit. The Letter of
Representation provides formal confirmation from management that it has fulfilled its
responsibilities for the preparation of the financial statements, has made available all
relevant information and records requested by the auditor, and has disclosed all matters
that could have a material impact on the financial statements. The letter forms part of the
audit evidence obtained by the external auditor and is a standard requirement of the audit
process. 
5.  PROPOSALS  
5.1  The audited Connected Charities Annual Accounts for 2025/26 are presented in
APPENDIX 1 for consideration and approval.  The Letter of Representation can be found in
APPENDIX 2.    
6.  SUMMARY OF IMPLICATIONS  
Page 146

Page 147

6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  ✓
Policy and Legal ✓ 
Financial  ✓
Risk  ✓
StaƯing  ✓
Best Value and Transformation  ✓
Property  ✓
Information Communications Technology/Digital             ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change and Biodiversity Impact  ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal  
According to Paragraph 6 (1) of the Local Authority Accounts (Scotland) Regulations 1985,
a Local Authority is required to submit its Audited Accounts to the Council by 30
September each year.   
The review by the External Auditors of the council’s Accounts is in accordance with the
Council’s Code of Corporate Governance and ensures that the council complies with
established policies, procedures, laws and regulations. 
Page 147

Page 148

6.4  Financial 
The audit process highlighted identified no changes to the financial information in the
Annual Accounts and therefore there has been no change in the balances held.  
6.5  Risk 
None arising from this report. The work undertaken by the External Auditor provides
assurance to the council that the Connected Charity Accounts for 2025/26 give a true and
fair view of the financial position and expenditure and income for the year.  
6.6  StaƯing 
StaƯ throughout the Council provide information for the inclusion in the annual Statement
of Accounts.  
6.7  Best Value and Transformation 
None arising from this report.  
6.8  Property 
None arising from this report.  
6.9  Information Communications/Technology/Digital 
None arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact  
Does the proposal have the
potential to aƯect people from the
below categories diƯerently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION – The Annual Accounts are a retrospective statement of the
Connected Charities’ financial performance and do not, in themselves, result in any
Page 148

Page 149

change to services or policy. Accordingly, no direct impacts on equalities, social
inclusion, or the economy have been identified. 
6.11  Climate Change and Biodiversity Impacts 
None arising from this report. 
7.  CONSULTATION  
7.1  There has been no consultation carried out as part of preparing this report.   
8.  BACKGROUND PAPERS  
8.1  Held within Accountancy section. 
Page 149

Page 150

No embedded text on this page.

Page 151

AUDITED
The Moray Council - Connected Charity Trust Funds
Trustees' Report and Financial Statements
For the year ended 31 March 2026
APPENDIX 1
Page 151

Page 152

Contents
Pages
Trustees' Annual Report 1 - 4
Statement of Financial Activities 5
Balance Sheet 6
Notes to the Financial Statements:
Note 1 Statement of Financial Activities 7-8
Note 2 Balance Sheet 9-10
Note 3 Investment Income 11
Note 4 Awarding of Grants 11
Note 5 Investments 12
Note 6 Other Income 12
Note 7 Debtors 12
Note 8 Creditors: amounts falling due within one year 13
Note 9 Financial Instruments 13
Note 10 Related Parties 13
Note 11 Trustee Remuneration, Benefits and Expenses 13
Note 12 Staff Costs and Emoluments 13
Note 13 External Audit Costs 14
Note 14 Accounting Policies  14-15
Independent Auditor’s Opinion 16-17
Page 152

Page 153

1 
Trustees' Annual Report    
Objectives and Activities    
Moray Council acts as sole trustee for 8 Connected Charity Trust Funds listed below which have charitable status
and are registered with the Office of the Scottish Charity Regulator (OSCR).    
The policy relating to the reinvestment of income in, and disbursement from, Trust Funds was amended on 8
October 2013. The policy was amended to allow disbursement of capital from Trust Funds in accordance with the
trust deed, provided there is unanimity amongst the trustees.  For all other trusts the whole annual income of the
trust will be available for disbursement in accordance with the trust deed, provided sufficient funds are maintained
to meet commitments.     
The following table gives the OSCR charity registration number, the charity name and an indication of the purpose
of each Trust.  The only activity carried out by each of the Trusts in relation to those purposes is the making of
grants.     
Charity
Number
Charity Name Purpose
SC019017 Moray and Nairn Educational
Trust
To provide assistance to persons who have been resident in
Moray and Nairn for the last five years and to organisations
belonging to the former counties of Moray and Nairn for:
•bursaries for attendance at a Scottish University or central
institution
• grants for adult education
•provision and maintenance of sports facilities for the benefit of
young people
•travel grants for educational purposes
SC019033 Keith Poor Householders Fund
(Keith Nursing Trust Fund)
The relief of poverty for residents of the burgh of Keith and
provision of financial assistance for funerals. Such individuals
may apply to the trust fund for a grant. Only residents of Keith
are eligible.
SC019065 Castlehill Trust To support in the upkeep, maintenance and management of
Castlehill, Forres.
SC019066 Grant Park Trust To support in the upkeep, maintenance and management of
Grant Park, Forres.
SC019068 George Boyd Anderson Bequest To support improvements to the community of Lossiemouth.
Individuals and groups may apply to the trust fund for a grant.
Only people resident in Lossiemouth are eligible.
SC019069 Mr & Mrs William J Watt Dufftown
Food Fund
The relief of poverty amongst residents of Dufftown by providing
groceries. Such individuals may apply to the trust fund for a
grant. Only residents of Dufftown are eligible.
SC019071 Robert Young Trust The relief of poverty for men in Forres aged over 65. Such
individuals may apply to the trust fund for a grant. Only residents
of Forres are eligible.
SC046791 The Moray Council Charitable
Trust
Single Trust created for the reorganisation of existing funds that
are restricted or have been fulfilled as far as possible. The trust
purposes must follow those of the reorganised trusts. There are
nine sub categories within the trust, by location and purpose. 
The Council agreed to a trust reorganisation process at a meeting on 14 November 2012; to create a single
charitable Trust which would enable the reorganisation and transfer of assets of existing small charities held by the
Council whose purposes could no longer be met. 
Page 153

Page 154

2 
Trustees' Annual Report (continued)    
The Moray Council Charitable Trust was created in August 2016 with the objective of reorganising existing trust
funds that are frustrated, perhaps due to limited funds or out of date purposes, into one large trust, split into
geographical areas then split again into charitable purposes. The Trusts being transferred into the single charitable
trust will be utilised, as far as possible, in a manner consistent with the original Trust purposes. 
This will create many ring-fenced funds within the single Trust, but will enable the resources of these trusts to be
applied to better effect for charitable purposes rather than remaining in a frustrated trust that cannot be used. 
Achievements and Performance    
During the year 28 grants totalling £11,762 were made to individuals from the Moray and Nairn Educational trust,
which includes means tested grants for education within Moray and Nairn, and bursaries for attendance at further
education institutions in Scotland. A further grant of £1,000 was made to West End Primary School for which the
same amount of income was received from the estate of the late Mr Brian Fraser. 
Financial Review     
The Moray and Nairn Educational Trust is an endowment fund, with income from investments allocated to an
unrestricted fund of the trust. All other funds are unrestricted. This differentiation of funds is an essential feature in
the presentation of a charity's statement of financial activities (SoFA) and balance sheet.  
The trust funds use the Moray Council's bank account for financial transactions, and the balance is invested in the
Council's Loans Fund for which it earns interest on the balance. It was agreed at the Moray Council meeting on 27
August 2024 that interest on balances held in the Council’s bank for the next two years would be calculated using
the two year fixed Public Works Loans Board rate as at 1 April 2024 of 5.41%. Income received during the year
was £43,178 (2024/25 £41,759).  This was made up of £23,786 interest received from the Council's Loans Fund
and £19,392 of dividend income (2024/25 £22,808 and £18,951 respectively).   
Grants totalling £11,762 were paid out during the year (2024/25 £29,036). Governance costs for the year were
£8,894 (2024/25 £8,659).    
The Trust Funds have no specific reserves policy other than noted above regarding disbursement of capital and
annual income. For many of the trust funds, the terms of the trust deed are very restrictive and this has resulted in
a gradual accumulation of reserves over time. In the event that an individual trust fund falls into deficit, the trustees
will consider whether it is likely that the deficit is temporary and can be recovered. If deficit recovery is considered
unlikely, the Trust is effectively wound up and an application will be made to OSCR to remove them from the
Scottish Charity Register.     
The revenue reserves held at 31 March 2026 were £1,171,656 (31 March 2025 £1,075,997).   
Structure, Governance and Management 
The trustees of the funds are the councillors listed on page 4. The trustees of the funds are the local Councillors
who are appointed at local government elections and by-elections    
The trust funds are governed using the same governance framework that is applicable to the Council. This
framework includes the principles:    
• taking informed and transparent decisions which are subject to effective scrutiny and managing risk 
• engaging with local people and other stakeholders to ensure robust public accountability    
Statement of trustees' responsibilities     
The trustees are responsible for preparing the Trustees' Annual Report and the financial statements in accordance
with applicable law and regulations.         
The law applicable to charities in Scotland requires the trustees to prepare financial statements for each financial
year. Under that law the trustees have prepared the financial statements in accordance with United Kingdom 
Page 154

Page 155

3 
Trustees' Annual Report (continued) 
Generally Accepted Accounting Practice (United Kingdom Accounting Standards and applicable law). Under that
law the trustees must not approve the financial statements unless they are satisfied that they give a true and fair 
view of the state of affairs of the charity and of the incoming resources and application of resources of the charity
for that period.         
In preparing these financial statements, the trustees are required to:    
• select suitable accounting policies and then apply them consistently;   
• observe the methods and principles in the Charities SORP;    
• make judgements and estimates that are reasonable and prudent;    
• state whether applicable UK Accounting Standards have been followed, subject to any material   
departures disclosed and explained in the financial statements; and    
• prepare the financial statements on the going concern basis unless it is inappropriate to presume that
the charity will continue in business.         
The trustees are responsible for keeping accounting records that are sufficient to show and explain the charity's
transactions and disclose with reasonable accuracy at any time the financial position of the charity and enable
them to ensure that the financial statements comply with the Charities and Trustee Investment (Scotland) Act 2005,
the Charities Accounts (Scotland) Regulations 2006 (as amended) and the provisions of the trust deed. They are
also responsible for safeguarding the assets of the charity and hence for taking reasonable steps for the prevention
and detection of fraud and other irregularities.         
The trustees are responsible for the maintenance and integrity of the charity and financial information included on
the Moray Council's website in so far as it relates to the charity.  Legislation in the United Kingdom governing the
preparation and dissemination of financial statements may differ from legislation in other jurisdictions. 
Parent Entity 
Moray Council has a 100% interest in the Connected Charities and for the purposes of incorporation within the
Council’s own Group Accounts, recognition has been made of the Council’s controlling interest. The Council
administers these charities, but their assets are not available to the Council and have not been included in the
Council’s balance sheet but are considered in Moray Council’s Group Accounts. 
The Charities SORP guidance requires that where a charity is a subsidiary they must disclose in a note to their
account’s additional information of its parent entity, including: 
Parent’s principal purposes and activities
Moray Council is local authority in Scotland and provides statutory functions and provides public services, including
education, social care, waste management, libraries and planning. 
Control exercised by the parent
Control can be exercised by the Council (the parent) through corporate trusteeship. Decisions regarding the general
control and management of the Connected Charity Trust Funds are made by the Corporate Committee of the
Council, which has delegated authority from the Council in this regard, but ultimately control rests with the full
Council of elected members. 
Auditor 
The Connected Charity Trusts Auditor is:         
Grant Thornton UK LLP
Level 8
120 Bothwell Street
Glasgow
G2 7JS     
Reference and Administrative details         
The financial statements of the charities listed on page 1 are included in this report.   
Page 155

Page 156

4 
Trustees' Annual Report (continued) 
Trustees         
In terms of the "Trustees" of the Connected Charity Trust Funds, the guidance provided by OSCR is that those
who have “general control and management" of the charity are the charity trustees. Decisions regarding the general
control and management of the Connected Charity Trust Funds are made by the Corporate Committee of the
Council, which has delegated authority from the Council in this regard; but ultimately control rests with the full
Council of elected members. We have therefore interpreted the above guidance as meaning all elected members
are charity trustees. 
All of the trustees for the financial statements are normally elected or re-elected at local government elections.
By-elections are held to elect new members, on the occasions of elected members vacating their positions, who
automatically become trustees.     
Names of Trustees in financial year 2025/256     
Councillor James Allan  
Councillor Peter Bloomfield  
Councillor Neil Cameron  
Councillor Tracy Colyer  
Councillor Theresa Coull  
Councillor John Cowe  
Councillor John Divers  
Councillor Amber Dunbar  
Councillor Jeremie Fernandes  
Councillor Donald Gatt  
Councillor David Gordon  
Councillor Juli Harris  
Councillor Sandy Keith
Councillor Elaine Kirby  
Councillor Scott Lawrence  
Councillor Marc Macrae  
Councillor Paul McBain  
Councillor Neil McLennan  
Councillor Shona Morrison  
Councillor Bridget Mustard
Councillor Kathleen Robertson  
Councillor Derek Ross
Councillor John Stuart  
Councillor Draeyk Van Der Horn  
Councillor Sonya Warren  
Councillor Ben Williams           
Principal Address of the Trust Funds is:         
The Moray Council    
Council Offices    
High Street    
Elgin    
IV30 1BX 
Signed by one trustee on behalf of all the trustees:     
Councillor Kathleen Robertson 
Leader of Moray Council
Page 156

Page 157

5 
Statement of Financial Activities for the year ended 31 March 2026 
2025/26 2025/26 2025/26 2024/25
Notes Unrestricted Endowment Total Funds Total Funds
£ £ £ £
Income and endowments from:
Investments 3 43,178         -                 43,178       41,759       
Other Income 6 1,000           -                 1,000         10,000      
Total 44,178         -                 44,178       51,759      
Expenditure on:
Charitable Activities 4 20,656         -                 20,656       37,695      
Total 20,656         -                 20,656       37,695       
Net gains/(losses) on investments 5 -                    72,136     72,136       14,457      
Net Income/(Expenditure) 23,522         72,136     95,658       28,521      
Transfers between funds -                    -                 -                  -                 
Net movement in funds 23,522         72,136     95,658       28,521       
Reconciliation of Funds:
Total funds brought forward at 1 April 338,480      737,517   1,075,997 1,047,476
Total funds carried forward at 31 March 362,002      809,653   1,171,655 1,075,997 
All results derive from continuing operations. 
There is no material difference between the funds carried forward for the financial year stated above and their
historical cost equivalents, with the exception of the Fixed Asset Investments which are carried at fair value. 
All gains and losses recognised in the year are included in the statement of financial activities.
Page 157

Page 158

6 
Balance Sheet as at 31 March 2026 
2025/26 2024/25
Notes £ £
Fixed Assets:
Investments 5 701,652           629,516       
Current assets:
Loan Fund Balance 476,141           452,308       
Debtors 7 1,363                1,363            
477,504           453,671       
Liabilities:
Creditors: amounts falling due within one year 8 (7,500)               (7,190)           
Net current assets 470,004           446,481       
Total net assets or liabilities 1,171,656        1,075,997    
The funds of the charity:
Endowment Funds 761,182           737,518       
Unrestricted Funds 410,474           338,479       
Total charity funds 1,171,656        1,075,997     
The notes on pages 8 to 16 form part of these financial statements.
The audited Financial Statements were issued by the Trustees on 30 September 2026. 
Councillor Kathleen Robertson 
Leader of Moray Council 
Page 158

Page 159

7 
Notes to the Financial Statements 
Note 1 Statement of Financial Activities for the year ended 31 March 2026 
Moray and
Nairn
Educat ional
Trust
Moray and
Nairn
Educat iona
l Trust
Keit h Poor
Householder s
Fund ( Keit h
Nursing Tr ust
Fund)
Cast lehill
Trust
Gr ant
P ark Trust
George
Boyd
Anderson
Bequest
Mr and Mrs
William J
Wat t
Duf f t own
Food Fund
Robert
Young
Trust
The Moray
Council
Charit able
Trust
Tot al
Unrest rict ed
f unds
Tot al
Endowment
f unds
SC019017 SC019017 S C019033 S C019065 S C019066 SC019068 SC019069 S C019071 SC046791
2025/ 26 2025/ 26 2025/ 26 2025/ 26 2025/ 26 2025/ 26 2025/ 26 2025/ 26 2025/ 26 2025/ 26 2025/ 26
Notes Unrestricted Endowment Unrestricted Unrestricted Unrestricted Unrestricted Unrestricted Unrestricted Unrestricted
£ £ £ £ £ £ £ £ £ £ £
Income and endowment s f rom:
Investment Income 3 26,017                            -                   136                                             -                                       167                               1,846                         -                   832                             14,180                             43,178                               -                   
Other Income 6 1,000                                -                   -                                                     -                                       -                                       -                                       -                                           -                                      -                                              1,000                                   -                   
Tot al 27,017         -                   136                   -                 167            1,846        -                   832           14,180         44,178          -                   
Expendit ure on:
Charitable Activities 4 17,841                             -                   179                                             -                                       181                                354                              -                   186                              1,915                                 20,656                              -                   
Tot al 17,841         -                   179                   -                 181            354           -                   186           1,915            20,656          -                   
Net gains/(losses) on investments 5 -                                              72,136 -                                                     -                                       -                                       -                                           -                                      -                                              -                                                 72,136
Net Income/ ( Expendit ure) 9,176 72,136 ( 43) 0 ( 14) 1,492 0 646 12,265 23,522 72,136
Transf ers bet ween f unds -                    -                   -                 -                 -                 -                   -                -                    -                      -                   
Net movement in f unds 9,176 72,136 ( 43) 0 ( 14) 1,492 0 646 12,265 23,522 72,136
Reconciliat ion of f unds:
Total funds brought forward at 1 April 2025 14,487                            737,518                     2,423                                      3                                      3,005                        34,895                    -                                           15,655                    268,012                        338,480                          737,518                      
Tot al f unds carried f orward at
31 March 2026 23,663        809,654    2,380              3                2,991        36,387     -                   16,301     280,277      362,002       809,654     
Page 159

Page 160

8 
Notes to the Financial Statements (continued) 
Note 1 Statement of Financial Activities for the year ended 31 March 2025 
M or ay and
Nai r n
Educ at i ona l
Tr ust
Mor a y and
Na ir n
Educa t iona
l Tr ust
Ke it h P oor
House holde r s
Fund ( Kei t h
Nur sing Tr ust
Fund)
Ca st le hill
Tr ust
Gr ant
P a r k Tr ust
Geor ge
Boyd
Ande r son
Beque st
M r a nd M r s
Willi am J
Wa t t
Duf f t own
Food Fund
Robe r t
Young
Tr ust
The M or ay
Counc il
Char it a ble
Tr ust
Tot a l
Unr est r ic t e d
f unds
Tot a l
Endowme nt
f unds
S C0 19 0 17 S C019 0 17 S C019 0 3 3 S C01906 5 S C0 19 06 6 S C0 190 68 S C0190 6 9 S C019 0 7 1 S C04 6 7 9 1
2 0 24 / 25 20 2 4/ 25 2 0 24 / 25 2 0 24 / 2 5 2 02 4/ 25 202 4 / 2 5 20 2 4 / 2 5 2 0 2 4 / 25 20 2 4/ 25 2 02 4 / 25 20 2 4/ 2 5
Not es Unrestricted Endowment Unrestricted Unrestricted Unrest ricted Unrest rict ed Unrestrict ed Unrestricted Unrestrict ed
£ £ £ £ £ £ £ £ £ £ £
I nc ome and e ndowme nt s f r om:
Invest ment Income 3 25,352                           -                   137                                             -                                       165                               1,879                         -                   792                             13,434                            41,759                               -                   
Ot her Income 6 10,000                            -                   -                                                     -                                       -                                       -                                       -                                           -                                      -                                              10,000                               -                   
Tot a l 35 ,3 5 2        -                   137                   -                 165            1,8 79        -                   7 9 2           13 , 43 4         51,7 59          -                   
Ex pendit ur e on:
Charitable Activities 4 32,339                           -                   172                                             -                                       173                               2,901                         -                   179                              1,931                                 37,695                              -                   
Tot a l 32 ,3 3 9        -                   172                   -                 173            2 ,9 0 1        -                   17 9           1,9 3 1            3 7,6 95          -                   
Net gains/ (losses) on investments 5 -                                              14,458 -                                                     -                                       -                                       -                                           -                                      -                                              -                                                 14,458
Net Inc ome / ( Expe ndit ur e ) 3 ,0 13 14 , 45 8 ( 3 5) 0 ( 8 ) ( 1, 022 ) 0 6 13 11,5 03 14 ,0 6 4 14, 45 8
Tr a nsf e r s be t we en f unds -                    -                   -                 -                 -                 -                   -                -                    -                      -                   
Net mov e me nt in f unds 3 ,0 13 14 , 45 8 ( 3 5) 0 ( 8 ) ( 1, 022 ) 0 6 13 11,5 03 14 ,0 6 4 14, 45 8
Reconc ili at i on of f unds:
Total funds brought forward at 1 April 2023 11,474                             723,060                    2,458                                      3                                      3,013                         35,917                     -                                           15,042                    256,509                       324,416                           723,060                     
Tot a l f unds c a r r ie d f or wa r d a t
3 1 M a r c h 2 02 4 14 ,4 8 7         7 3 7 ,5 18     2 ,423              3                3, 005       34,8 95     -                   15 ,6 5 5     2 68 ,0 12      3 3 8,4 80       73 7,5 18     
Page 160

Page 161

9 
Notes to the Financial Statements (continued) 
Note 2 Balance Sheet as at 31 March 2026 
Moray and
Nairn
Educational
Trust
Keith Poor
Household
ers Fund
(Keith
Nursing
Trust Fund)
Castlehill
Trust
Grant Park
Trust
George
Boyd
Anderson
Bequest
Mr and Mrs
William J
Watt
Dufftown
Food Fund
Robert
Young
Trust
The Moray
Council
Charitable
Trust 
TOTAL
SC019017 SC019033 SC019065 SC019066 SC019068 SC019069 SC019071 SC046791
2025/26 2025/26 2025/26 2025/26 2025/26 2025/26 2025/26 2025/26 2025/26
Notes £ £ £ £ £ £ £ £ £
Fixed Assets
Investments 5 701,652       -                  -                  -                  -                  -                  -                  -                  701,652      
Current Assets
Loans Fund Balance 135,481       2,558           3                  3,170           36,566         -                  16,477         281,886       476,141       
Debtors 7 1,363           -                  -                  -                  -                  -                  -                  -                  1,363          
136,844       2,558           3                  3,170           36,566         -                  16,477         281,886       477,504      
Liabilities:
Creditors: amounts falling
due within one year 8 (5,178)         (178)            -                  (179)            (179)            -                  (179)            (1,607)         (7,500)        
(5,178)         (178)            -                  (179)            (179)            -                  (179)            (1,607)         (7,500)        
Net Current Assets 131,666       2,380           3                  2,991           36,387         -                  16,298         280,279       470,004      
Total net assets or
liabilities 833,318       2,380           3                  2,991           36,387         -                  16,298         280,279       1,171,656   
The funds of the charity:
Endowment Funds 761,182       -                  -                  -                  -                  -                  -                  280,279       1,041,461   
Unrestricted Funds 72,136         2,380           3                  2,991           36,387         -                  16,298         130,195      
Total charity funds 833,318       2,380           3                  2,991           36,387         -                  16,298         280,279       1,171,656    
Page 161

Page 162

10 
Notes to the Financial Statements (continued) 
Note 2 Balance Sheet as at 31 March 2025 
Moray and
Nairn
Educational
Trust
Keith Poor
Household
ers Fund
(Keith
Nursing
Trust Fund)
Castlehill
Trust
Grant Park
Trust
George
Boyd
Anderson
Bequest
Mr and Mrs
William J
Watt
Dufftown
Food Fund
Robert
Young
Trust
The Moray
Council
Charitable
Trust 
TOTAL
SC019017 SC019033 SC019065 SC019066 SC019068 SC019069 SC019071 SC046791
2024/25 2024/25 2024/25 2024/25 2024/25 2024/25 2024/25 2024/25 2024/25
Notes £ £ £ £ £ £ £ £ £
Fixed Assets
Investments 5 629,516       -                  -                  -                  -                  -                  -                  -                  629,516      
Current Assets
Loans Fund Balance 126,031       2,593           3                  3,176           35,126         -                  15,824         269,555       452,308       
Debtors 7 1,363           -                  -                  -                  -                  -                  -                  -                  1,363          
127,394       2,593           3                  3,176           35,126         -                  15,824         269,555       453,671      
Liabilities:
Creditors: amounts falling
due within one year 8 (4,905)         (171)            -                  (171)            (231)            -                  (171)            (1,541)         (7,190)        
(4,905)         (171)            -                  (171)            (231)            -                  (171)            (1,541)         (7,190)        
Net Current Assets 122,489       2,422           3                  3,005           34,895         -                  15,653         268,014       446,481      
Total net assets or
liabilities 752,005       2,422           3                  3,005           34,895         -                  15,653         268,014       1,075,997   
The funds of the charity:
Endowment Funds 737,518       -                  -                  -                  -                  -                  -                  -                  737,518       
Unrestricted Funds 14,487         2,422           3                  3,005           34,895         -                  15,653         268,014       338,479      
Total charity funds 752,005       2,422           3                  3,005           34,895         -                  15,653         268,014       1,075,997      
Page 162

Page 163

11 
Notes to the Financial Statements (continued) 
202 5/ 2 6 2 02 4/ 2 5 20 25/ 2 6 202 4/ 25 2 02 5/ 26 20 24 / 2 5 20 25/ 2 6 20 24/ 25 20 25/ 26 20 24 / 25 2 02 5/ 26 2 024 / 2 5
£ £ £ £ £ £ £ £ £ £ £ £
Note 3 Investment Income
Interest earned on loans pool balances 6,625 6,401 -                    -                    136               136               -                           -                       167 165 1,846            1,879           
Dividend income 19,392 18,951 -                    -                    -                    -                       -                   
2 6,017    2 5,3 52   -            -            13 6        13 6        -                 -              167         16 5         1,8 46     1,8 79     
Note 4 Charitable Activities
Grants Paid 11,762           26,536         -                    -                    -                    -                    -                           -                       -                    -                    -                    2,500          
Governance Costs:
Accountancy and Legal costs 900              897               -                    -                    -                    1                    -                           -                       2                   2                   176                171                
Audit of Financial Statements 5,179             4,905           -                    -                    179                171                 -                           -                       179                171                 178                231              
17,8 41    3 2,33 8   -            -            179         172         -                 -              18 1         173         354        2,90 2    
Total
Unrestricted
funds 
Total
Endowment
funds
202 5/ 2 6 2 02 4/ 2 5 20 25/ 2 6 202 4/ 25 2 02 5/ 26 20 24 / 2 5 20 25/ 2 6 20 25/ 2 6 20 25/ 26 20 24 / 25
£ £ £ £ £ £ £ £ £
Note 3 Investment Income
Interest earned on loans pool balances -                    -                    832              792               14,180          13,435          23,786               -                       23 ,78 6   22 ,8 08  
Dividend income -                    -                    -                    -                    -                    -                    19,392                -                       19,39 2   18,9 51   
-            -            832        792        14,18 0    13,4 35    43 ,178        -              43 ,178    41,759   
Note 4 Charitable Activities
Grants Paid -                    -                    -                    -                    -                    -                    11,762                 -                       11,76 2    29 ,0 36  
Governance Costs:
Accountancy and Legal costs -                    -                    8                   8                   308              390              1,394                  -                       1,39 4     1,4 69    
Audit of Financial Statements -                    -                    178                171                 1,607            1,541             7,500                  -                       7,50 0     7,190     
-            -            186        179         1,915      1,93 1      20 ,6 56       -              20 ,6 56   37,69 5  
George Boyd Anderson
Bequest
M oray and Nairn
Educational Trust 
M oray and Nairn
Educational Trust
Keith Poor Householders
Fund (Keith Nursing
Trust Fund)
Castlehill Trust Grant Park Trust
Unrestricted
SC0 19 017 SC019017 SC019 03 3 SC0190 65 SC0 19 066 SC019 06 8
TOTAL
SC0190 69 SC019071 SC046 791
Unrestricted Endowment Unrestricted Unrestricted Unrestricted
Unrestricted Unrestricted Unrestricted
M r and M rs William J
Watt Dufftown Food
Fund
Robert Y oung Trust The M oray Council
Charitable Trust
Page 163

Page 164

12 
Notes to the Financial Statements (continued) 
Note 5 Investments 
There is only one trust with investments; Moray and Nairn Educational Trust (SC019017). The investments are all unit
trusts managed in line with the investment policy of the trust. Investments are included at fair value as at the balance
sheet date. The return on investment is made up of the income derived from the investment (e.g. interest and dividends)
and any gain or loss in the market value of the investment. If a charity sells an investment, a gain or loss on the carrying
amount of the asset is realised upon its disposal. Where a charity retains an investment, an unrealised gain or loss on
the carrying amount of the investment may arise at the balance sheet date. 
Trust law applies different rules to endowment funds. In an endowment, trustees cannot add the income from investments
to the endowment capital; the income from the investment is allocated to the unrestricted fund. However, any gain or
loss on investment is attributed to the endowment capital. 
The gain/(loss) on Revaluation figure includes the movement in the market value of all investments held by the trust. 
2025/26 2024/25
£ £
Add: Net (loss)/gain on revaluation 72,135     14,458    
Net gains/(losses) on investments 72,135     14,458    
Balance Sheet 2025/26 2024/25
£ £
Opening Balance 629,517   615,059  
Add: Net (loss)/gain on revaluation 72,135     14,458    
Balance sheet value of Investments 701,652   629,517  
SoFA - Movement in the Available for Sale Reserve
Note 6 Other Income
£ £
Bequest from the estate of the late Miss Henderson - Moray -                10,000    
and Nairn Educational Trust
Donation to West End Primary - Moray & Nairn Education Trust 1,000       -               
1,000       10,000     
Note 7 Debtors
2025/26 2024/25
£ £
Investment income - Moray and Nairn Educational Trust 1,363       1,363      
Total 1,363       1,363       
Page 164

Page 165

13 
Notes to the Financial Statements (continued) 
Note 8 Creditors: amounts falling due within one year 
2025/26 2024/25
£ £
Audit fee 7,500       7,190      
7,500       7,190       
Note 9 Financial Instruments 
The trust funds only have financial assets and financial liabilities of a kind that qualify as basic financial instruments per
FRS 102. Basic financial instruments are recognised at transaction value. The financial instruments disclosed in the
Balance Sheet are made up of the following categories:
2025/26 2024/25
£ £
Debtors
Financial Assets carried at contract amounts 1,363       1,363      
Loans Fund Balances 476,141   452,308  
Total Debtors 477,504   453,671  
Creditors
Financial Liabilities carried at contract amounts 7,500       7,190      
Total Creditors 7,500       7,190       
Note 10 Related Parties 
The Trustees and Moray Council are the only related parties of the Connected Charities. There were no transactions
during the year between any of the Trustees and the Connected Charity Trust Funds.
The trust funds use Moray Council's bank account for all transactions and the balance is invested in the Council's loans
fund, for which it earns interest. There are no other outstanding balances due to or from Moray Council at 31 March
2026. The trustees are required by the Charities SORP to disclose material transactions with related parties; bodies or
individuals that have the potential to control or influence the Trusts Funds, or to be controlled or influenced by the Trust
Funds. The amounts paid by the Connected Charities to Moray Council for support services, including legal and finance
costs, in 2025/26 was £1,394 (2024/25 £1,469). 
Note 11 Trustee Remuneration, Benefits and Expenses 
None of the trustees of the Trust Funds and no associated person connected with any of them have received any
remuneration or any other benefit for their services. Further, no directly incurred expenses were reimbursed to the
trustees during the year. 
Note 12 Staff Costs and Emoluments 
The Trust Funds have no employees and have not incurred any staff costs or emoluments. 
Page 165

Page 166

14 
Notes to the Financial Statements (continued) 
Note 13 External Audit Costs 
The Connected Charities incurred £7,500 of statutory audit fees for the audit of the Connected Charities Trustees
Report and Financial Statements for the year ended 31 March 2026. This cost has been accrued in 2025/26 and
allocated to each trust (£7,190 2024/25). 
Note 14 Accounting Policies 
Basis of Preparation 
The financial statements for the charitable trusts have been prepared in accordance with the Charities: Statement of
Recommended Practice 2015, commonly referred to as the SORP, in accordance with the Financial Reporting 
Standard 102 (FRS 102), which is effective for accounting periods beginning after 1 January 2019. The financial
statements have been prepared under the historical cost convention as modified by the inclusion of investments at 
fair value, in accordance with the Charities and Trustee Investment (Scotland) Act 2005 and the Charities Accounts
(Scotland) Regulations 2006 (as amended). 
The financial statements are prepared on a going concern basis, and in accordance with applicable United Kingdom
accounting standards. The principal accounting policies have been applied consistently throughout the year. 
In line with Regulation 7 of the 2006 Regulations, these financial statements have been prepared on the basis that the
Trust funds for which it acts as sole Trustee are connected charities.  As such the financial statements for the individual
charities have been prepared on a collective basis for the Council. 
An amendment to the Charities SORP (FRS 102) issued by the Financial Reporting Council and published in February
2016 states the requirement for larger charities to prepare a statement of cash flow. The charitable trusts are not classed
as a large charity and so a cash flow statement has not been prepared this year. 
Fund Accounting 
Unrestricted funds are spent or applied at the discretion of the trustees to further any of the charity's purposes. 
Endowment funds represent those assets which must be held permanently by the charity. Income generated from
endowment funds held for investment must be spent on furthering its charitable purposes. 
Incoming Resources 
Investment income and other income is accounted for in the period in which the charity is entitled to the receipt and the
amount can be measured with reasonable certainty. 
Resources expended 
Expenditure is included in the financial statements on an accruals basis and recognised when the activity takes place
and not simply when the cash payment is made. 
Governance costs include the costs of the preparation and examination of statutory financial statements; legal advice to
trustees on governance or constitutional matters and costs of administering grants. 
Investments 
Investments are included at fair value at the balance sheet date in accordance with the principles of the SORP. 
Investment gains and losses include any gain or loss on the sale of investments and any gain or loss resulting from
revaluing investments to fair value at the end of the period. 
Page 166

Page 167

15 
Notes to the Financial Statements (continued) 
Note 14 Accounting Policies (continued) 
Other Matters 
The Connected Charities is an arrangement that enables the trust funds for which Moray Council are sole trustees, and
which are individually registered with OSCR, to be brought together and included in the Connected Charities Trustees' 
Report and Financial Statements. As registered charities, they are entitled to certain tax exemptions on income and
profits from investments, and surpluses on any trading activities carried on in furtherance of the charities primary
objectives, if these profits and surpluses are applied solely for charitable purposes. 
The connected charities are a Public benefit entity as defined by FRS 102 in that their primary objective is to make grants
to the individuals or community groups rather than with a view to providing a financial return to trustees.
The Charitable Activities of the trusts are making grants in accordance with the trust deeds and in agreement of the
Trustees. 
There are no judgements, apart from those involving estimations, that the trustees have made in the process of applying
the entity's accounting policies that have a significant effect on the amounts recognised in the accounts. 
The trustees have assessed events occurring after the reporting date up to the date of the approval of the financial
statements and confirm that there have been no events since the reporting date which require disclosure or adjustment
in the financial statements. 
There are no key assumptions concerning the future, or other key sources of estimation uncertainty at the reporting date,
that have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the
next reporting period. 
Page 167

Page 168

16 
Independent auditor’s report to the trustees of The Moray Council – 
Connected Charity Trust Funds and the Accounts Commission 
Reporting on the audit of the financial statements 
Opinion on financial statements 
We certify that we have audited the financial statements in the statement of accounts of The Moray Council – Connected
Charity Trust Funds for the year ended 31 March 2026 under Part VII of the Local Government (Scotland) Act 1973 and
section 44(1)(c) of the Charities and Trustee Investment (Scotland) Act 2005. The financial statements comprise the
Statement of Financial Activities, the Balance Sheet, the Cash Flow Statement and notes to the financial statements,
including significant accounting policies. The financial reporting framework that has been applied in their preparation is
applicable law and the United Kingdom Accounting Standards, including Financial Reporting Standard 102 The Financial
Reporting Standard applicable in the UK and Republic of Ireland (United Kingdom Generally Accepted Accounting
Practice). 
In our opinion the accompanying financial statements: 
 give a true and fair view of the state of affairs of the charity as at 31 March 2026 and of its incoming resources
and application of resources for the year then ended; 
 have been properly prepared in accordance with United Kingdom Generally Accepted Accounting Practice; and 
 have been prepared in accordance with the requirements of the Charities and Trustee Investment (Scotland)
Act 2005, and regulation 8 of The Charities Accounts (Scotland) Regulations 2006. 
Basis for opinion 
We conducted our audit in accordance with applicable law and International Standards on Auditing (UK) (ISAs (UK)), as
required by the Code of Audit Practice approved by the Accounts Commission for Scotland. Our responsibilities under
those standards are further described in the auditor’s responsibilities for the audit of the financial statements section of
our report. We are independent of the charity in accordance with the ethical requirements that are relevant to our audit
of the financial statements in the UK including the Financial Reporting Council’s Ethical Standard, and we have fulfilled
our other ethical responsibilities in accordance with these requirements. We believe that the audit evidence we have
obtained is sufficient and appropriate to provide a basis for our opinion. 
Conclusions relating to going concern basis of accounting 
We have concluded that the use of the going concern basis of accounting in the preparation of the financial statements
is appropriate. 
Based on the work we have performed, we have not identified any material uncertainties relating to events or conditions
that, individually or collectively, may cast significant doubt on the charity’s ability to continue to adopt the going concern
basis of accounting for a period of at least twelve months from when the financial statements are authorised for issue. 
Responsibilities of the trustees for the financial statements 
As explained more fully in the Statement of Trustees, the trustees are responsible for the preparation of financial
statements that give a true and fair view in accordance with the financial reporting framework, and for such internal
control as the trustees determines is necessary to enable the preparation of financial statements that are free from
material misstatement, whether due to fraud or error. 
In preparing the financial statements, the trustees are responsible for assessing the charity's ability to continue as a
going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of
accounting unless the trustees intend to discontinue the charity's operations, or have no realistic alternative but to do so. 
Auditor’s responsibilities for the audit of the financial statements 
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from
material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion.
Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with
ISAs (UK) will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are
considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic
decisions of users taken on the basis of these financial statements. 
Irregularities, including fraud, are instances of non-compliance with laws and regulations. We design procedures in line
with our responsibilities outlined above to detect material misstatements in respect of irregularities, including fraud.
Procedures include: 
 using our understanding of the local government sector and charity sector to identify that the Local Government
(Scotland) Act 1973, the Charities and Trustee Investment (Scotland) Act 2005, and The Charities Accounts
(Scotland) Regulations 2006 are significant in the context of the charity; 
 inquiring of the Trustees as to other laws or regulations that may be expected to have a fundamental effect on
the operations of the charity; 
 inquiring of the Trustees concerning the charity’s policies and procedures regarding compliance with the
applicable legal and regulatory framework; 
Page 168

Page 169

17 
 discussions among our audit team on the susceptibility of the financial statements to material misstatement,
including how fraud might occur; and 
 considering whether the audit team collectively has the appropriate competence and capabilities to identify or
recognise non-compliance with laws and regulations. 
The extent to which our procedures are capable of detecting irregularities, including fraud, is affected by the inherent
difficulty in detecting irregularities, the effectiveness of the charity’s controls, and the nature, timing and extent of the
audit procedures performed. 
Irregularities that result from fraud are inherently more difficult to detect than irregularities that result from error as fraud
may involve collusion, intentional omissions, misrepresentations, or the override of internal control. The capability of the
audit to detect fraud and other irregularities depends on factors such as the skilfulness of the perpetrator, the frequency
and extent of manipulation, the degree of collusion involved, the relative size of individual amounts manipulated, and the
seniority of those individuals involved. 
A further description of the auditor’s responsibilities for the audit of the financial statements is located on the Financial
Reporting Council's website www.frc.org.uk/auditorsresponsibilities. This description forms part of our auditor’s report. 
Reporting on other requirements 
Other information 
The trustees are responsible for the other information in the statement of accounts. The other information comprises the
Trustees’ Annual Report. 
Our responsibility is to read all the other information and, in doing so, consider whether the other information is materially
inconsistent with the financial statements or our knowledge obtained in the course of the audit or otherwise appears to
be materially misstated. If we identify such material inconsistencies or apparent material misstatements, we are required
to determine whether this gives rise to a material misstatement in the financial statements themselves. If, based on the
work we have performed, we conclude that there is a material misstatement of this other information, we are required to
report that fact. We have nothing to report in this regard. 
Our opinion on the financial statements does not cover the other information and we do not express any form of
assurance conclusion thereon except on the Trustees’ Annual Report to the extent explicitly stated in the following
opinion prescribed by the Accounts Commission. 
Opinions prescribed by the Accounts Commission on the Trustees’ Annual Report 
In our opinion, based on the work undertaken in the course of the audit, the information given in the Trustees' Annual
Report for the financial year for which the financial statements are prepared is consistent with the financial statements
and that report has been prepared in accordance with the Charities SORP (FRS 102). 
Matters on which we are required to report by exception 
We are required by The Charity Accounts (Scotland) Regulations 2006 to report to you if, in our opinion: 
 proper accounting records have not been kept; or 
 the financial statements are not in agreement with the accounting records; or 
 we have not received all the information and explanations we require for our audit. 
We have nothing to report in respect of these matters. 
Use of our report 
This report is made solely to the parties to whom it is addressed in accordance with Part VII of the Local Government
(Scotland) Act 1973 and for no other purpose. In accordance with paragraph 108 of the Code of Audit Practice, we do
not undertake to have responsibilities to members or officers, in their individual capacities, or to third parties. 
Angela Pieri (for and on behalf of Grant Thornton UK LLP), 
120 Bothwell Street
Glasgow
G2 7JS 
Date: 
Grant Thornton UK LLP is eligible to act as an auditor in terms of Part VII of the Local Government (Scotland) Act 1973 
Page 169

Page 170

No embedded text on this page.

Page 171

Office of the Council Leader
Councillor Kathleen Robertson 
Moray Council
Council Office Elgin Moray IV30 1BX
Telephone: 01343 563520
Mobile: 07975 958908 
Grant Thornton UK LLP
8th Floor
120 Bothwell Street
Glasgow
G2 7JS 
E-mail:    kathleen.robertson@moray.gov.uk 
Your reference: 
Our reference: AB/LJC/   
Dear Grant Thornton UK LLP 
MORAY COUNCIL – CONNECTED CHARITY TRUST FUNDS
FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 MARCH 2026 
This representation letter is provided in connection with the audit of the financial
statements of The Moray Council – Connected Charity Trust Funds(the 'charity')for
the year ended 31 March 2026 for the purpose of expressing an opinion as to
whether the financial statements give a true and fair view in accordance with
applicable law and United Kingdom Accounting Standards, including FRS 102 'The
Financial Reporting Standard applicable in the UK and Republic of Ireland ('United
Kingdom Generally Accepted Accounting Practice'). 
We confirm that to the best of our knowledge and belief having made such inquiries
as we considered necessary for the purpose of appropriately informing ourselves: 
Financial statements
i We have fulfilled our responsibilities, to conduct an audit as set out in the terms
of the audit engagement letter from Audit Scotland dated 18 May 2022, for the
preparation of the financial statements in accordance with United Kingdom
Generally Accepted Accounting Practice; in particular the financial statements
give a true and fair view in accordance therewith. 
ii We acknowledge our responsibility for the design, implementation and
maintenance of internal control to prevent and detect fraud. 
iii The methods, the data and the significant assumptions used by us in making
accounting estimates and their related disclosures are appropriate to achieve
recognition, measurement or disclosure that is reasonable in the context of the
applicable financial reporting framework. 
Page 171

Page 172

2 
Grant Thornton UK LLP         
iv Related party relationships and transactions have been appropriately
accounted for and disclosed in accordance with the requirements of United
Kingdom Generally Accepted Accounting Practice. 
v All events subsequent to the date of the financial statements and for which
United Kingdom Generally Accepted Accounting Practice requires adjustment
or disclosure have been adjusted or disclosed. 
vi The financial statements are free of material misstatements, including
omissions. 
vii Actual or possible litigation and claims have been accounted for and disclosed
in accordance with the requirements of United Kingdom Generally Accepted
Accounting Practice. 
Information provided
viii We have provided you with: 
a. Access to all information of which we are aware that is relevant to the
preparation of the financial statements such as records, documentation and
other matters;
b. Additional information that you have requested from us for the purpose of
your audit; and
c. Unrestricted access to relevant persons whom you determined it necessary
to obtain audit evidence. 
ix All transactions have been recorded in the accounting records and are reflected
in the financial statements. 
x We have disclosed to you the results of our assessment of the risk that the
financial statements may be materially misstated as a result of fraud. 
xi We have disclosed to you all information in relation to fraud or suspected fraud
that we are aware of and that affects the charity and involves: 
a. Management;
b. Employees who have significant roles in internal control; or
c. Others where the fraud could have a material effect on the financial
statements. 
xii We have disclosed to you all information in relation to allegations of fraud, or
suspected fraud, affecting the charity's financial statements communicated by
employees, former employees, analysts, regulators or others. 
Page 172

Page 173

3 
Grant Thornton UK LLP         
xiii We have disclosed to you all known instances of non-compliance or suspected
non-compliance with laws and regulations whose effects should be considered
when preparing financial statements. 
xiv We have disclosed to you the identity of the charity's related parties and all the
related party relationships and transactions of which we are aware. 
xv We have disclosed to you all known actual or possible litigation and claims
whose effects should be considered when preparing the financial statements. 
Approval
The approval of this letter of representation was minuted by full Council at its
meeting on 30 September 2026. 
Yours sincerely 
Kathleen Robertson
Council Leader 
Date:
Signed on behalf of The Moray Council – Connected Charity Trust Fund 
Page 173

Page 174

Page 174