Page 1

Moray Council 
Wednesday, 30 September 2026 
NOTICE IS HEREBY GIVEN that a Meeting of the Moray Council is to be held at
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Wednesday, 30
September 2026 at 09:30. 
BUSINESS 
1. Sederunt   
2. Declaration of Group Decisions and Members Interests *   
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government (Scotland)
Act 1973, as amended, the public and media representatives be excluded
from the meeting for Item 20-27 of business on the grounds that it
involves the likely disclosure of exempt information of the class
described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.”   
4. Minutes of meeting of 30 June 2026   7 - 18
5. Written Questions **   
6. Update to Health and Social Care Integration Scheme for
Moray
Report by Executive Director Economy, Enterprise and Operations  
19 -
122
Page 1

Page 2

7. Corporate Plan – Progress Update 2025-26
Report by Executive Director Finance, Strategy and Transformation  
123 -
142
8. Short to Medium Term Financial Strategy 2027-29
Report by Executive Director Finance, Strategy and Transformation  
143 -
168
9. Draft Cooper Park Masterplan
Report by Executive Director Economy, Enterprise and Operations  
169 -
176
10. Community Wealth Building Strategy Update
Report by Executive Director Economy, Enterprise and Operations  
177 -
200
11. Just Transition Fund 2026-27 Update
Report by Executive Director Economy, Enterprise and Operations  
201 -
210
12. Regeneration Capital Grant Fund 2027-28 Additional
Applications
Report by Executive Director Economy, Enterprise and Operations  
211 -
222
13. Bus Revolution Strategic Approach and Revenue Budget
Phase 3
Report by Executive Director Economy, Enterprise and Operations  
223 -
246
14. Introduction of booking system at Forres Household Waste
and Recycling Centre
Report by Executive Director Economy, Enterprise and Operations  
247 -
268
15. Options for Additional Council Tax Charge and Second
Home Premium
Report by Executive Director Finance, Strategy and Transformation  
269 -
288
16. Wider After School Activities Proposal Update
Report by Executive Director Education, Housing and Communities  
289 -
304
17. Meeting Attendance Protocol
Report by Executive Director Economy, Enterprise and Operations  
305 -
328
18. Future Meeting Dates
Report by Executive Director Economy, Enterprise and Operations  
329 -
334
Page 2

Page 3

19. Outside Bodies Appointments
Report by Executive Director Economy, Enterprise and Operations  
335 -
348 
Item(s) which the Committee may wish to consider with the
Press and Public excluded   
20. St Giles - Progress Update and Next Steps [Para 9]
• 9. Any terms proposed or to be proposed by or to the authority in
the course of negotiations for a contract for the acquisition or
disposal of property or the supply of goods or services. 
21. Levelling Up Fund - Programme Update and Proposed
Funding Reallocation [Para 9]
• 9. Any terms proposed or to be proposed by or to the authority in
the course of negotiations for a contract for the acquisition or
disposal of property or the supply of goods or services. 
22. Garmouth Viaduct [Para 9]
• 9. Any terms proposed or to be proposed by or to the authority in
the course of negotiations for a contract for the acquisition or
disposal of property or the supply of goods or services. 
23. Financial Management System Modernisation [Para 8]
• 8. The amount of any expenditure proposed to be incurred by the
authority under any particular contract for the acquisition of
property or the supply of goods or services. 
24. Outcome of Closing Date Following Marketing [Paras 8 and
9]
• 8. The amount of any expenditure proposed to be incurred by the
authority under any particular contract for the acquisition of
property or the supply of goods or services.
• 9. Any terms proposed or to be proposed by or to the authority in
the course of negotiations for a contract for the acquisition or
disposal of property or the supply of goods or services. 
25. Negotiations with sitting tenant [Paras 8 and 9]
• 9. Any terms proposed or to be proposed by or to the authority in
the course of negotiations for a contract for the acquisition or
disposal of property or the supply of goods or services.
• 8. The amount of any expenditure proposed to be incurred by the
authority under any particular contract for the acquisition of
property or the supply of goods or services. 
Page 3

Page 4

26. Update on Negotiations Following Marketing of Industrial
Estate [Paras 7 and 9]
• 7. Information relating to the financial or business affairs of any
particular person (other than the authority).
• 9. Any terms proposed or to be proposed by or to the authority in
the course of negotiations for a contract for the acquisition or
disposal of property or the supply of goods or services. 
27. Wider After School Activities Proposal - Workforce [Para 1]
• 1. Information relating to a particular employee, former employee
or applicant to become an employee of, or a particular office-
holder, former office-holder or applicant to become an office-
holder under, the authority. 
Watching the Meeting
You can watch the webcast live by going to:    
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 4

Page 5

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by
5pm three working days prior to the day of the meeting, please see Standing Order
36 for deadlines.  A copy of any written answer provided by the Chair will be
published on the Council’s committee management system by 12pm the day
before the meeting.  The Member who has put the question may, after the answer
has been published, may ask one supplementary question directly related to the
subject matter at the meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 5

Page 6

MORAY COUNCIL 
Moray Council 
SEDERUNT 
Councillor Kathleen Robertson (Chair)
Councillor Amber Dunbar (Depute Chair)  
Councillor James Allan (Member)
Councillor Peter Bloomfield (Member)
Councillor Neil Cameron (Member)
Councillor Tracy Colyer (Member)
Councillor Theresa Coull (Member)
Councillor John Cowe (Member)
Councillor John Divers (Member)
Councillor Jérémie Fernandes (Member)
Councillor Donald Gatt (Member)
Councillor David Gordon (Member)
Councillor Juli Harris (Member)
Councillor Sandy Keith (Member)
Councillor Elaine Kirby (Member)
Councillor Scott Lawrence (Member)
Councillor Marc Macrae (Member)
Councillor Paul McBain (Member)
Councillor Neil McLennan (Member)
Councillor Shona Morrison (Member)
Councillor Bridget Mustard (Member)
Councillor Derek Ross (Member)
Councillor John Stuart (Member)
Councillor Draeyk van der Horn (Member)
Councillor Sonya Warren (Member)
Councillor Ben Williams (Member)   
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Moray Council 
Tuesday, 30 June 2026 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe, Councillor
John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor Elaine Kirby,
Councillor Scott Lawrence, Councillor Marc Macrae, Councillor Paul McBain,
Councillor Neil McLennan, Councillor Shona Morrison, Councillor Bridget Mustard,
Councillor Kathleen Robertson, Councillor Derek Ross, Councillor Draeyk Van Der
Horn, Councillor Sonya Warren 
APOLOGIES 
Councillor Sandy Keith, Councillor John Stuart, Councillor Ben Williams 
IN ATTENDANCE 
Chief Executive, Executive Director Economy, Enterprise and Operations, Executive
Director Education, Housing and Communities, Executive Director Finance, Strategy
and Transformation, Chief Governance Officer, Head of Operations and Environment,
Head of Education, Head of Housing, Property and Communities, Chief Financial
Officer, Service Manager Strategic Finance, Service Manager Finance Operations,
Service Manager Strategic Development and Planning, Service Manager Growth Deal,
Service Manager Democratic Services, Principal Climate Change Strategy Officer,
Senior Project Officer (Office Review), Business Gateway Manager and Senior
Housing Officer (Strategy).   
1.         Chair 
The meeting was chaired by Councillor Kathleen Robertson.  
2.         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 and the Councillors' Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any further
declarations of Member's interests in respect of any item on the agenda.    
In terms of transparency, Councillor Fernandes stated that in terms of Item 18 on the
agenda he is employed by Moray UHI but would remain in the meeting. 
Item 4.
Page 7

Page 8

3.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media representatives be excluded
from the meeting for Item 14 of business on the grounds that it involves the likely
disclosure of exempt information of the class described in the relevant Paragraphs of
Part 1 of Schedule 7A of the Act.  
Para
Number of
Minute
Para Number of Schedule 7a
20
Para 8
The amount of any expenditure proposed to be incurred by the
authority under any particular contract for the acquisition of property
or the supply of goods or services.
21
Para 7
Information relating to the financial or business affairs of any
particular person (other than the authority).
22
Para 9
Any terms proposed or to be proposed by or to the authority in the
course of negotiations for a contract for the acquisition or disposal
of property or the supply of goods or services.
23
Para 9
Any terms proposed or to be proposed by or to the authority in the
course of negotiations for a contract for the acquisition or disposal
of property or the supply of goods or services. 
24
Para 1
Information relating to a particular employee, former employee or
applicant to become an employee of, or a particular office-holder,
former office-holder or applicant to become an office-holder under,
the authority.   
4.         Minute of meeting dated 6 May 2026 
The minutes of the meeting of 6 May 2026 were submitted and approved, subject to
the addition at para 9 to confirm that the vote was taken whilst the webcast was
paused.  
5.         Minutes of meeting of 19 May 2026 
The minute of the special meeting on 19 May 2026 was submitted and approved.  
6.         Written Questions 
The Council noted that no written questions had been submitted. 
Page 8

Page 9

7.         Vary Order of Business 
In terms of Standing Order 29 the meeting agreed to vary the order of business set
down on the agenda and take item 7, as the first item of business in order to allow
those presenting the report to depart the meeting at the earliest convenience.  
8.         Climate Change Strategy 
The meeting had before it, a report by the Executive Director Economy, Environment
and Operations asking the Council to note responses to the draft Moray Council
Climate Change Strategy (CCS) and approve the final version of the Strategy.  
Following lengthy consideration, the Council unanimously agreed to:  
i) note the responses to the draft Strategy set out in Appendix 1; and    
ii) approves the final version of the Climate Change Strategy 2026 - 2036, as set
out in Appendix 2 and the action plan in Appendix 3 
9.         Portgordon School Bus Service Petition 
The meeting had before it, a report by the Executive Director Economy, Enterprise and
Operations asking Council to consider the recently submitted Petitions PE2026-001
and PE2026-002 in relation to the Portgordon School Bus received from Mrs Iona
Shewan and Ms Ianthe Mitchell, Mr Jack Pickerill and Ms Yvie Shewan, the terms of
which stated:  
PE2026-001
We request that Moray Council re-instate the dedicated school bus service for
children and young people from Portgordon.  
The current walking route provided to families is unsafe.  It requires walking along an
unlit 60mph road, in close proximity to sea and surgace water, and along narrow
sections with poor visibility for drivers and pedestrians.  The path is too narrow in
places, forcing users to step onto the road to pass others.  During darker winter
months and adverse weather conditions, these risks increase significantly.  The
pathways are unlit, untreated in icy conditions, and exposed to severe wind and sea
spray.  
The path leading to the old railway bridge is poorly maintained, with multiple trip
hazards including rotten wooden steps and unstable or missing fencing.  The steps
are not made of non-slip materials.  We do not believe this route is a safe or
reasonable option for school children.  
The alternative public bus service is unreliable.  Buses are often delayed,
overcrowded or cancelled at short notice.  Timings do not align with the school day,
with the morning service arriving far too early and the afternoon service departing
long after school finishes.  In poor weather, services are frequently cancelled, and
there are no sheltered bus stops near the school.  
Page 9

Page 10

The previous dedicated bus ensured save, timely travel and reduced congestion.  We
therefore ask the Council to re-instate this essential service.  
PE2026-002
This petition is to try and stop the Council from withdrawing school transport from
Portgordon to Buckie High School as the safe walking route is not safe.  The path runs
next to a 60mph road which is unlit and then carries on to a victorian bridge which
was in a report last year found to have been neglected, with sever corrosion and in
need of maintenance.  The Stagecoach service is not reliable and with an increasing
rate of anti social behaviour and violence on buses a large amount of people do not
feel safe to ride on a bus.  This will impact significantly on pupil attainment during
periods of cold/icy weather.  Roads/pavements in Portgordon do not get gritted which
would make the walk very unsafe for pupils to take as they may fall and injure
themselves.  Stagecoach busses usually get cancelled when there is very bad
weather and so pupils would be unable to arrive to school safely.  
The Chair welcomed Mrs Shewan and Ms Mitchell and asked them to outline the
terms of their petitions.  
The Head of Operations and Environment outlined the response to the petition as
detailed in the briefing report.  
The Chair confirmed the options available to the Committee were:  
1. Direct that the petition (in whole or part) proceeds to a full hearing, at the next
available date of this Committee, another appropriate service committee or at
a full meeting of The Moray Council; OR
2. Reject the petition (in whole or in part), giving the reason for rejection; OR
3. For simple issues, instruct immediate action by the Council without any further
hearing or report; OR
4. Pass the petition to the relevant director and chairperson to look into, with or
without any specific direction as to action.  
Following lengthy consideration of the petitions, Councillor Robertson proposed a
short adjournment to allow Groups to consider how to progress with the item.  
On the resumption of the meeting Councillor Robertson stated that no consensus
had been reached and moved to reject the petition for the following reasons:  
• satisfied that the policy had been followed and reviewed and delivered
following Scottish Government guidance, as delegated to Officers;
• there is a review in train as requested by Councillor Warren when the policy
was set;
• that there is a material change, in that Stagecoach timetables now fit with the
school day, as was announced last week; and
• the contract implications and the need for equity across Moray would be
costly and again satisfy that mitigations have been explored and delivered or in
progress.  
This was seconded by Councillor Macrae.  
Page 10

Page 11

In response, Councillor Morrison, seconded by Councillor Warren proposed that a
further report be brought back to Council as soon as possible which would examines
in detail the equality and safety impacts for the affected communities.  To also ask
Officers to outline the potential long-term impact the policy change might have on the
sustainability of Moray's rural communities and that the report required an
intersectional approach to examine the combinative impact these changes might
have on affected communities and needed to be done in partnership with those
impacted.    
The amendment was in relation to the option at bullet point 4 - that the petition would
be passed to the relevant Executive Director and chair to look into, with or without
any specific direction.  
On the division there voted:  
For the motion (14)
Councillors Robertson, Macrae, Allan, Bloomfield, Colyer,
Cowe, Divers, Dunbar, Gatt, Gordon, Kirby, McBain,
Mustard and Ross 
For the amendment (9)  Councillors Morrison, Warren, Cameron, Coull,
Fernandes, Harris, Lawrence, McLennan and van der Horn
Abstention (0)    
As Councillors Harris and McLennan joined the meeting remotely and were not using
Council IT equipment, their votes were taken verbally and added to the results in the
Chamber.  
Accordingly, the motion became the finding of the meeting and the Council agreed to
reject the petition for the following reasons:  
• satisfied that the policy had been followed and reviewed and delivered
following Scottish Government guidance, as delegated to Officers;
• there is a review in train as requested by Councillor Warren when the policy
was set;
• that there is a material change, in that Stagecoach timetables now fit with the
school day, as was announced last week; and
• the contract implications and the need for equity across Moray would be
costly and again satisfy that mitigations have been explored and delivered or in
progress.  
Councillors Harris and van der Horn left the meeting at the conclusion of this item.  
10.         Revenue Out-Turn Variances from Budget 
The meeting had before it, a report by the Executive Director Finance, Strategy and
Transformation advising the Council of the major variances from the approved budget
in the actual out-turn for 2025/26 revenue budget.  
Following consideration, the Council unanimously agreed to:  
i) note the Council’s year end financial position for 2025/26, being an overspend
of £230,000 on total expenditure; 
Page 11

Page 12

ii) note the major variances from the approved budget for 2025/26 as
summarised in Appendix 1 and detailed in Section 5 of this report;    
iii)  note the status of the approved savings for 2025/26;    
iv) approve the additional £93,000 to be funded from the Transformation Reserve
for the SWAN2 (Wide Area Network) project implementation costs; and    
v) note the transfer of unspent funding to earmarked reserves in line with funding
conditions.   
11.         Capital Plan 2025-2026 Budget Monitoring 
The meeting had before it a report by the Chief Executive informing Council of the
expenditure to 31 March 2026 under the Capital Plan for financial year 2025/26 and to
recommend budget adjustments for inclusion in the Capital Plan for 2026/27 and
future years.  
Following consideration, the Council unanimously agreed to:  
i) note full year expenditure to 31 March 2026 of £32,596,000 against an
approved amended budget of £50,564,000 as set out in Appendix 1;    
ii) approve the final carry forwards and amendments to 2026/27 and future years
totalling an increase of £18,247,000;    
iii) approve further amendments to the Capital Plan for 2026/27
following confirmation of the Scottish Government funding settlement and
other funding allocations for the same period, resulting in an amended Capital
Plan for 2026/27 of £77,294,000; and    
iv) note the update to the Garmouth Viaduct span removal project as noted in
Section 10.   
12.         Unaudited Annual Accounts for 2025-26 
The meeting had before it, a report by the Executive Director Finance, Strategy and
Performance asking Council to consider the unaudited Annual Accounts for the year
to 31 March 2026 for both Moray Council and the Connected Charity Trust Funds
administered by the Council.  
Following consideration, the Council unanimously agreed:  
i) to note the unaudited Annual Accounts for Moray Council for the year ended
31 March 2026;     
ii) to note Moray Council Connected Charity Trust Funds Trustees’ Report and
Financial Statements for the year ended 31 March 2026; and      
Page 12

Page 13

iii) that delegated authority be granted to the Section 95 Officer to submit
a revised second draft of the accounts to the External Auditor
following completion of the Council Dwellings valuation.  
Councillor Williams joined the meeting during the consideration of this item.  
13.         Common Good Funds - Summary Expenditure 2025-26 Estimated
Disposable Income 2026-27 
The meeting had before it, a report by the Executive Director Finance, Strategy and
Transformation informing the Council of the final position of Common Good Funds at
31 March 2026 and the estimated income available for disbursement in 2026/27.  
Following consideration, the Council unanimously agreed:  
i) to note the disbursements approved for 2025/26 for each of the Common
Good Funds shown in APPENDIX 1; 
ii) to approve the carry forward of the undisbursed balances for 2025/26 for
the Buckie, Cullen, Dufftown, Elgin, Portknockie, Keith and Findochty Funds
to be made available in 2026/27;    
iii) the estimated income available for disbursement in 2026/27 shown in
Appendix 1;    
iv) to note the Balance Sheet for each Common Good at Appendix 2; and    
v) to note Common Good Fund asset register at Appendix 3.   
14.         Elgin Neighbourhood Board - Appointment of Chair 
The meeting had before it, a report by the Executive Director Economy, Enterprise and
Operations asking Council to agree and appoint the Chair of Elgin Neighbourhood
Board following an open recruitment process.  
The Council joined the Chair in thanking the outgoing Chair and Vice Chair of the
Board.  
Following consideration, the Council unanimously agreed:  
i) to note the recruitment process followed by Elgin Neighbourhood Board
to appoint a new Chair;    
ii)  to appoint Jackie Andrews as Chair of Elgin Neighbourhood Board; and 
iii) that the Chief Executive write a letter of thanks to the outgoing Chair and Vice
Chair.    
Page 13

Page 14

15.         Council Records Management Plan 
The meeting had before it, a report by the Executive Director Economy, Enterprise and
Operations asking Council to note the position in relation to the external inspection of
the Council's Records Management Plan and to agree an Action Plan to address
outstanding issues.  
Following consideration, the Council unanimously agreed:  
i) to note the issues identified from improvement by the Keeper outlined in
section 4;    
ii) to agree the Action Plan to address these issues at Appendix 1;    
iii) that the progress on implementation of the Action Plan will be monitored
through the Corporate Risk Register and the Information Governance Annual
report; and    
iv) to note the temporary additional resource being directed to implement the
Action Plan.   
16.         Timeline Options for Consideration of a potential draft Visitor Levy
Scheme 
The meeting had before it, a report by the Executive Director Economy, Enterprise and
Operations seeking agreement to proceed with the development of a draft Visitor
Levy Scheme proposal for Moray, to be brought before Council for consideration in
August 2027.  
Following consideration, the Council unanimously agreed to:  
i) note the legislative amendments to the Act introduced through the Visitor Levy
(Amendment) (Scotland) Bill, enacted 21 May 2026;    
ii)  note the two timeline options presented for the development of a draft Visitor
Levy Scheme proposal;    
iii) proceed with the development of a draft Visitor Levy Scheme proposal based
on the timeline for a report to be brought before the Council in August 2027;
and    
iv) approve the additional resource implications associated with each option.  
17.         Moray Growth Deal Annual Report 2025 
The meeting had before it, a report by the Executive Director Economy, Enterprise and
Operations providing Council with a copy of the Moray Growth Deal's 2025 annual
report.  
Following consideration, the Council unanimously agreed to approve the 2025 Moray
Growth Deal Annual Report.
Page 14

Page 15

Councillor van der Horn re-joined the meeting during consideration of this item.  
18.         Short-Term Let Control Areas 
The meeting had before it, a report by the Executive Director Economy, Enterprise and
Operations asking Council to consider the feasibility of introducing Short Term let
control areas in Moray and whether there are any specific areas within Moray that
require more detailed analysis.  
Following consideration, the Council unanimously agreed:  
i) to note the contents of the report; and    
ii) that Officers do not progress with designating any Short-Term Let Control Areas
in Moray at this time.   
19.         Information Reports - if called in 
The Council noted that the Information Reports had not been called in.  
20.         Case Management System Replacement Report [Para 8] 
The meeting had before it, a report by the Chief Finance Officer, Moray Integration Joint
Board seeking approval for the budget to replace the case management system.  
Following consideration the Council unanimously agreed:  
i) to note that the current case management system support has already expired
and the new case management system has been procured;    
ii) to approve the allocation from the transformation fund for the new case
management system and associated implementation expenses, with the goal
of introducing the new replacement system by March 2027 as detailed in
paragraph 6.2; and    
iii) to note that savings will be achieved from year 4 over the duration of the
contract, which will be 10 years and will be fully repaid to the transformation
reserve (in years 4 to 9) as detailed in para 6.4.   
21.         Moray Growth Deal Skills Delivery [Para 7] 
The meeting had before it, a report by the Executive Director Economy, Enterprise and
Operations updating Council on the work undertaken to identify a replacement skills
project for the Moray Growth Deal (MGD), with approval sought for the recommended
option to enter the outline and then full business case development stages.  
Following consideration, the Council unanimously agreed to:  
Page 15

Page 16

i) note the progress made to identify a replacement skills project for the Moray
Growth Deal; and    
ii) approve that detailed business case development work can be undertaken on
the preferred option (outline to full business case development stages, with a
report back to Council at the end of the outline business case stage).   
22.         Depot and Stores Rationalisation Project Update [Para 9] 
The meeting had before it, a report by the Executive Director Education, Housing and
Communities updating Council on progress since Council approved the Full Business
Case (FBC) for the Depot and Stores Rationalisation Project on 25 June 2025, and to
advise that a revised approach to delivery is recommended, and to seek agreement to
incorporate the Keith Salt Barn project within the programme scope as part of the
overall rationalisation delivery framework.  
Following consideration, the Council unanimously agreed:  
i) to note the progress made to date in delivering the Depot and
Stores Rationalisation programme, including updated estate information,
early rationalisation activity and ongoing design development; 
ii) to note that detailed implementation planning has
strengthened understanding of the sequencing, interdependencies and
borrowing requirements across the programme, and that this has informed
the need for a revised delivery structure;    
iii)  to note the assessment of delivery options undertaken in line with
governance expectations, and agrees the hybrid delivery model as the most
effective approach for the next phase of the programme;     
iv) to note that a revised implementation plan aligned to the hybrid model
has now been prepared and is included as an appendix to this report;     
v) that programme monitoring and reporting will continue through
the established governance arrangements, with further updates provided
to Committee at appropriate intervals;    
vi)  to approve a revised programme delivery timeframe extending to Quarter
4 2029/30, reflecting updated implementation assumptions, lead-in
requirements and revised programme sequencing; 
vii) that the Keith Salt Barn project be incorporated within the
programme governance and implementation framework as a supporting
element of the wider Depot and Stores Rationalisation programme; and 
viii) that the Archives and Closed Records workstream be incorporated within the
governance framework of the Depot and Stores Rationalisation programme. 
Page 16

Page 17

23.         Moray Affordable Housing Programme - Compulsory Purchase Order
[Para 9] 
The meeting had before it, a report by the Executive Director Education, Housing and
Communities providing Council with an update and seek authorisation for the use of
compulsory purchase powers in relation to a property in Keith.  
Following consideration, the Council unanimously agreed to:  
i) progress a Compulsory Purchase Order (CPO) for the property;    
ii)  authorise the Head of Housing, Property and Communities and the
Service Manager Legal Services to prepare and sign all CPO documentation
and to take all necessary steps, including publication of all statutory notices,
to secure confirmation of the Order by the Scottish Ministers and the vesting
of the Land in the Council detailed in section 6.2; 
iii)  note that efforts to negotiate acquisition in parallel with the CPO process will
continue;    
iv) note the draft Statement of Reasons in Appendix 1; and    
v) note the draft Integrated Impact Assessment (IIA) in Appendix 2.  
24.         Suspension of Standing Orders 
In terms of Standing Order 83, the Chair sought agreement from the Council to
suspend Standing Order 75 in order to continue the meeting past 12.45pm should it
be required.  
This was unanimously agreed.  
25.         Chief Officer Recruitment Head of Growth Planning and Climate [Para 1] 
The meeting had before it, a report by the Depute Chief Executive Economy,
Enterprise and Operations asking the Council to approve arrangements for
recruitment of the Head of Growth, Planning and Climate (Chief Planning Officer).  
Following consideration, the Council unanimously agreed:  
i) to note the risks and opportunities associated with progressing with
recruitment to the Head of Growth, Planning and Climate Change
(Chief Planning Officer) in line with the current Job Description and
Person Specification in comparison to those with the changes proposed;    
ii)  that the Job Description and Person Specification be amended to show the
Chief Planning Officer role and skills / experience required to fulfil this as
a desirable rather than essential criteria; 
iii) to delegate authority to the Chief Executive acting in liaison with the Chairs
of Economic Development and Infrastructure (EDIS) and Planning and
Regulatory Services (PRS) Committees to either retain this role at Head of
Page 17

Page 18

Service level, or to devolve it to the Service Manager Strategic Planning and
Development (SM SPD) as appropriate in line with the recruitment outcomes,
adjusting the Scheme of Delegation as required; and 
iv) to note that a recruitment agency will be engaged to support the
recruitment process, as set out in para 6.4 of the report. 
Page 18

Page 19

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Alasdair McEachan Contact Email: alasdair.mceachan@moray.gov.uk 
Subject: Update to Health and Social Integration Scheme for Moray 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to approve amendments to the Health and Social Care
Integration Scheme for Moray following implementation of The Public Bodies (Joint
Working) (Integration Joint Boards) (Scotland) Amendment Order 2025, which came into
force on 1 September 2026. 
1.2  This report is submitted to Council in terms of Section II (21) of the Council’s Scheme of
Administration relating to the statutory functions delegated by the Council to the
Integration Joint Board for Moray in terms of the Integration Scheme for Moray.  
2.  SUMMARY  
2.1  The Public Bodies (Joint Working) (Integration Joint Boards) (Scotland) Amendment Order
2025 came into force on 1 September 2026 and extends voting rights on Integration Joint
Boards to third sector representative members, service user representative members and
unpaid carer representative members. The amendments require the Health and Social
Care Integration Scheme for Moray to be updated to reflect the legislative change and,
following approval by Moray Council and NHS Grampian, submitted to the Scottish
Government for final approval.  
3.  RECOMMENDATIONS  
3.1  It is recommended that Council:   
i)  Consider and approve the amendments to the Health and Social Care
Integration Scheme for Moray (Appendix 1); and   
ii)  Agree the submission of the Integration Scheme to the Scottish Government
for final approval, as required.   
Item 6.
Page 19

Page 20

Alasdair McEachan
Chief Governance Officer 
4.  BACKGROUND AND CONTEXT  
Original legislation
4.1  The Public Bodies Joint Working (Scotland) Act 2014 (“the Act”) and the Public Bodies
(Joint Working) (Integration Joint Boards) (Scotland) Order 2014 (“the Order”) made
provision for the operation, governance and membership of the MIJB. As a minimum this
must comprise voting members nominated from the NHS Board and Council; co-opted
non-voting members who are holders of key posts with the NHS and Council or the MIJB;
and co-opted non-voting members who are representatives of groups who have an
interest in the MIJB. There is flexibility to appoint additional non-voting members as the
Board sees fit. 
4.2  Section 2(3) of the Public Bodies (Joint Working) (Scotland) Act (2014) requires each Local
Authority and the Health Board to jointly prepare an Integration Scheme for the area of the
local authority.  Section 7(1) requires the Local Authority and the Health Board to jointly
submit an Integration Scheme to the Scottish Ministers for approval.   
Lived experience members
4.3  The Moray Health and Social Care Integration Scheme (“Integration Scheme”) requires 
-The Council appoint 4 voting members to the Board. 
-NHS Grampian to appoint 4 voting members to the Board
-MIJB to appoint at least one member from each of the following 3 groups as non-voting
members:
• third sector bodies
• service users
• unpaid carers 
Scheme update in 2023
4.4  The last update to the Integration Scheme was approved by Moray Council at their meeting
on 2 February 2023 (para 11 of minute refers). This was to delegate Children's Services to
the MIJB.  
What has changed?
4.5  The Public Bodies (Joint Working) (Integration Joint Boards) (Scotland) Amendment Order
2025 provides that these lived experience members will, from 01 September 2026, now
have full voting rights at Board meetings. The Integration Scheme now needs to be
changed to reflect this position.  
4.6  Arrangements for participation in committees, attendance, proxies and voting will be
formalised through revised Standing Orders, committee terms of reference and
associated  MIJB governance documentation. Training has been provided to the lived
experience members and the MIJB members handbook has been updated. 
5.  PROPOSALS  
5.1  It is proposed to make the changes to the Integration Scheme, shown as tracked changes,
in Appendix 1.
Page 20

Page 21

5.2  These changes are required for the Scheme to be compliant with the 2025 Order. The only
area for discretion is over the statutory provision to appoint "at least" one member from
each of the 3 lived experience groups.  To maintain the balance of voting membership on
the Board (currently 4 Council /4 NHS), it is proposed that the number of lived experience
voting members is capped at 3 members.   
5.3  These proposed changes are going through a parallel process of approval with NHS
Grampian Board and are due to be reported to Moray Integration Joint Board for noting on
24 September 2026.  Thereafter changes will be submitted to the Scottish Government (as
the statutory approval body) for final approval, as required. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal X 
Financial  X
Risk X 
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Policy and Legal 
The MIJB, through its approved Standing Orders for meetings, established under the Public
Bodies (Joint Working) (Integration Joint Boards) (Scotland) Act 2014, ensures that affairs
are administered in accordance with the law, probity and proper standards. 
6.3  Financial 
There are no financial implications arising from this report. 
6.4  Risk 
There is a risk that, if the Integration Scheme is not updated and approved, it may not
accurately reflect the current legislative framework governing voting membership of the
Moray Integration Joint Board. Approval of the proposed amendments will ensure
compliance with statutory requirements and support effective governance arrangements.  
6.5  Staffing 
There are no staffing implications arising from this report.  
6.6  Best Value and Transformation 
There are no Best Value and Transformation implications arising from this report.
Page 21

Page 22

6.7  Property 
There are no property implications arising from this report.  
6.8  Information Communications/Technology/Digital 
There are no information communications/technology/digital implications arising from
this report.  
6.9  Equalities, Social Inclusion and Economic Impact  
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ✓ ☐ ☐
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ✓ ☐ ☐
Human Rights of individuals ☐ ☐ ✓ ☐ ☐
Rights of Children or Young People
(UNCRC)
☐ ☐ ✓ ☐ ☐
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
Amendments are being made as a result of new Scottish Government legislation.  An
Equality Impact Assessment and a Child Rights and Wellbeing Impact Assessment have
been prepared and are available online at legislation.gov.uk.
The three lived experience groups are likely to have a higher proportion of people with
protected characteristic than the general population. Giving enhanced voting rights to
group representatives will enhance the democratic inclusion  for these groups.  
6.10  Climate Change and Biodiversity Impacts 
There are no climate change or biodiversity impacts arising from this report.   
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Chief Executive, Moray Council;
Chief Officer, Moray Health and Social Care Partnership; Caroline O’Connor, Committee
Services Officer and any comments made have been incorporated into the report
Page 22

Page 23

8.  BACKGROUND PAPERS  
8.1     
Page 23

Page 24

Page 24

Page 25

APPENDIX 1 
Health and Social Care 
Integration Scheme 
for 
Moray 
September 2026 
This document is also available in large print and other formats and
languages, upon request. Please call NHS Grampian Corporate
Communications on (01224) 551116 or (01224) 552245. 
Page 25

Page 26

Introduction 
This document outlines revised arrangements for how adults and older people care
services will be integrated and delivered by The Moray Council and NHS Grampian and
is prepared in line with the requirements of the Public Bodies (Joint Working) (Scotland)
Act 2014 (the “Act”) 
In revising the 2018 Integration Scheme we have engaged with carers, people who
currently use health and social care services in Moray, and our joint workforce. We have
also subjected the draft revised Scheme to an extensive consultation exercise and have
made further changes to the document based on the views and comments expressed
both by people and the organisations who took the opportunity to respond. 
During the consultation exercise we also informed people that the contents of this
revised Integration Scheme will be final, and it shall not be possible to make any
modifications to the revised Integration Scheme without a further consultation and
approval by Scottish Ministers.  We also explained that the revised Integration Scheme
will set out the parameters of our Strategic Plan which will present in more detail the
changes to the way we propose to deliver integrated care services in Moray in the future. 
At a time when the health and social care system is facing significant demographic and
financial challenges, we consider that this Integration Scheme will provide a strong
foundation to how we can best improve the quality of care we deliver to the people of
Moray. 
Page 26

Page 27

Aims and Outcomes of the Integration Scheme 
The main purpose of integration is to improve the wellbeing of people who use health
and social care services, particularly those whose needs are complex and involve
support from health and social care at the same time. The Integration Scheme is
intended to achieve the National Health and Wellbeing Outcomes prescribed by the
Scottish Ministers in Regulations under section 5(1) of the Act, namely: 
1.  People are able to look after and improve their own health and wellbeing and live
in good health for longer. 
2.  People, including those with disabilities or long-term conditions or who are frail,
are able to live, as far as reasonably practicable, independently and at home or
in a homely setting in their community. 
3.  People who use health and social care services have positive experiences of
those services, and have their dignity respected. 
4.  Health and social care services are centred towards helping to maintain or
improve the quality of life of people who use those services. 
5.  Health and social care services contribute to reducing health inequalities. 
6.  People who provide unpaid care are supported to look after their own health and
wellbeing, including to reduce any negative impact of their caring role on their
own health and wellbeing. 
7.  People using health and social care services are safe from harm. 
8.  People who work in health and social care services feel engaged with the work
they do and are supported to continuously improve the information, support,
care and treatment they provide. 
9.  Resources are used effectively and efficiently in the provision of health and
social care services.
Page 27

Page 28

Our Vision, Purpose, Local Principles and Values 
In aiming to fulfil the above 9 National Health and Wellbeing Outcomes, the following
Vision, Purpose, Local Principles and Values have been developed by listening to the
views of people who presently use health and social care services in Moray or who are
involved in the delivery of care and support. 
Our Vision
• To enable the people of Moray to lead independent, healthy and fulfilling lives in
active and inclusive communities, where everyone is valued, respected and
supported to achieve their own goals. 
Our Purpose
• Through health, social care and third sector professionals and commercial
providers working together with patients, unpaid carers, service users and their
families, we will promote choice, independence, quality and consistency of
services by providing a seamless, joined up, high quality health and social care
service. When it is safe to do so, we will always do our utmost to support people
to live independently in their own homes and communities for as long as
possible. We will strive to ensure resources are used effectively and efficiently to
deliver services that meet the needs of the increasing number of people with
longer term and often complex care needs; many of whom are older. 
Our Local Principles
• A single point of contact. We will make it easier for people to access
information and support by having a single point of contact for accessing health
and social care services where it is appropriate to do so.
• Continuity of care. We will appoint a single lead professional across health and
social care to facilitate improved communication with people in need of support
and when possible we will aim to provide continuity of care.
Page 28

Page 29

• Health and social care professionals share information. We will work to
ensure that people will have to tell their story only once and that their
information is shared with all relevant professionals.
• Signposting. Information and advice should be provided in a format that is right
for the person and is readily available in their community.
• Personalisation. Our vision means that we do not provide the same service for
everyone but the right service for each person. We will always aim to provide
choice and control.  
• Community outcomes. We will aim to support local communities to determine
their own health and well-being priorities and we will work in partnership towards
the realisation of these agreed outcomes.
• The conversation is at the heart of what we do and is the key to meaningful
action. Identifying positive outcomes that matter to people is based on a
conversation with the service user, patient, unpaid carer and sometimes the
whole community. This level of engagement is the essential first step in
delivering an outcomes-based service. 
• Best value. We will always endeavour to make the best use of public money by
ensuring that our services are efficient, effective and sustainable.   
Our values
• We will always work to support people to achieve their own outcomes and goals
that improve their quality of life.
• We will always listen and treat people with respect.
• We will always value the support and contribution provided by unpaid carers.
• We will respect our workforce and give them the support and trust they need to
help them achieve positive outcomes for the people of Moray. 
Page 29

Page 30

Integration Scheme 
The parties: 
MORAY COUNCIL, 
established under the Local Government etc. (Scotland) Act 1994 and having its
principal offices at Council Offices, High Street, Elgin, Moray IV30 1BX (hereinafter
referred to as “the Council” which expression shall include its statutory successors); 
And 
GRAMPIAN HEALTH BOARD, 
established under section 2(1) of the National Health Service (Scotland) Act 1978
(operating as “NHS Grampian”) and having its principal offices at Summerfield House, 2
Eday Road, Aberdeen AB15 6RE (hereinafter referred to as “NHS Grampian” which
expression shall include its statutory successors) 
(together referred to as “the Parties”, and each being referred to as a “Party”) 
Page 30

Page 31

1. Definitions and Interpretation 
1.1 In this Integration Scheme, the following terms shall have the following
meanings:- 
“Accountable Officer” means the National Health Service (“NHS”) officer
appointed in terms of section 15 of the Public Finance and Accountability
(Scotland) Act 2000;   
“Chief Officer” means the Officer appointed by the Integration Joint Board (IJB) in
accordance with section 10 of the Act; 
“Chief Social Work Officer” means the officer appointed by Moray Council in
terms of Section 3 of the Social Work (Scotland) Act 1968 
“Clinical, Care and Governance Committee” means the IJB committee that
supports and assists" the Board in achieving their clinical and care governance
responsibilities in compliance with the Health and Social Care Integration,
Clinical and Care Governance Framework Version 1 (Scottish Government
published October 2015). 
“Clinical Lead” means the registered medical practitioner who delivers primary
care services or some other registered health care professional who delivers
services within a community context who is appointed by the Chief Officer and
the Medical Director of NHS Grampian; 
“Community Planning Board” means the Moray Community Planning Board
established in terms of the Community Empowerment (Scotland) Act 2015 to
consider the strategic development and monitor the performance of the partner
agencies within Moray (which include both Moray Council and NHS Grampian ) in
delivering Locality Plans, the Local Outcomes Improvement Plan and any wider
CPP national matters.
Page 31

Page 32

“Direction(s)” means an instruction(s) from the Integration Joint Board in
accordance with section 26 of the Act; 
“Executive Director of Nursing and Midwifery” means the post that is
accountable for professional leadership for Nurses, Midwives and Allied Health
Professionals within the organisation; setting standards and enuring the delivery
of compassionate, caring and effective patient and family centred services. 
“IJB” means the Moray Integration Joint Board established by an Order made in
accordance with section 9 
“IJB Order” means the Public Bodies (Joint Working) (Integration Joint Boards)
(Scotland) Order 2014 as amended; 
“Integrated Budget” means the budget for the delegated resources for the
functions set out in the Scheme; 
“Integrated Services” means the functions and services listed in Annexes 1 and 2
of this Scheme; 
“Joint Performance Management Plan” means a resource which provides a list of
targets and measures for use within a performance framework; 
“Integrated Workforce Plan” means the three year plan for workforce resources,
produced collaboratively with Moray Council and NHS Grampian, aligned to the
objectives of IJB and in accordance with the guidance from Scottish
Government. 
“NHS Grampian Clinical and Care Governance committee” means the
committee that is responsible for demonstrating compliance with statutory
requirements in relation to clinical governance, authorising an accurate and
Page 32

Page 33

honest annual clinical governance statement and responding to scrutiny and
improvement reports by external bodies such as Healthcare Improvement
Scotland (or any successor) 
“Organisational Development Strategy” means the overarching planned and
systematic approach to developing the culture and improving the effectiveness
of the organisation, through engagement, communication, training and
development of staff.  It aligns strategy, individuals processes and values. 
“Outcomes” means the Health and Wellbeing Outcomes prescribed by the
Scottish Ministers in Regulations under section 5(1) of the Act; 
“Payment” means all of the following: a) the Integrated Budget contribution to
the Integration Joint Board; b) the resources paid by the Integration Joint Board to
the Parties for carrying out a Direction or Directions, in accordance with section
27 of the Act and c) does not require that a bank transaction is made; 
“Section 95 Officer” means the statutory post under the Local Government
(Scotland) Act 1973 being the Accountable (Proper) Officer for the administration
and governance of the financial affairs of the Council; 
“Strategic Plan” means the plan which the Integration Joint Board is required to
prepare and implement in relation to the delegated provision of health and social
care services to adults in accordance with section 29 of the Act; 
“Strategic Planning and Commissioning Group” means the forum that assists the
IJB and Chief Officer through the development of key strategic outcomes and
oversees, drives and strengthens strategic planning and commission of health
and social care services across Moray. 
“Strategic Risk Register” means the register that outlines the identified risks to
the implementation and achievement of the outcomes contained in the strategic
Page 33

Page 34

plan, showing the controls, mitigation actions and potential impacts if the risk
materialises.(17) 
“The act” means the Public Bodies (Joint Working) (Scotland) Act 2014; 
“The Administration Scheme” means the document that sets out the governance
and structure by which the MIJB conducts its affairs.  It details the structure of its
Committees and the functions referred to these Committees; 
“the Integration Scheme Regulations” means the Public Bodies (Joint Working)
(Integration Scheme) (Scotland) Regulations 2014; 
“the Scheme” means this Integration Scheme;
1.2 In implementation of their obligations under the Act, the Parties hereby agree as
follows: 
1.3 In accordance with section 1(2) of the Act, the Parties agreed that the integration
model set out in sections 1(4)(a) of the Act would be put in place for the IJB,
namely the delegation of functions by the Parties to a body corporate that is to be
established by an Order made in accordance with section 9 of the Act.  The
Moray Integration Joint Board was established by a Parliamentary Order on 6
February 2016. 
2. Local Governance Arrangements 
2.1 Requirements are contained in the Act including the detail of the remit and
constitution of the IJB but for context the following is repeated here: 
2.1.1 The remit of the IJB is to prepare and implement a Strategic Plan in
relation to the provision of health and social care services to adults in
their area in accordance with sections 29-39 of the Act. 
Page 34

Page 35

2.1.2 The regulation of the IJB’s procedure, business and meetings and that of
any Committee of the IJB will follow the IJB Order and the standing orders
which will be agreed by the IJB, and which may be amended by the IJB.
The Standing Orders will be set out in a separate document. 
2.1.3 NHS Grampian and the Council will continue to have in place an
appropriate governance structure to ensure effective delivery of any
functions or services not delegated as part of this scheme. 
2.1.4 NHS Grampian and the Council and any of their Committees will
positively support through productive communication and interaction the
IJB and its Committees to allow it to achieve its Outcomes and Vision. The
IJB will similarly support through productive communication and
interaction NHS Grampian and the Council and any of their Committees
in their delivery of integrated and non-integrated services. 
2.1.5 The IJB has a distinct legal personality and the autonomy to manage itself. 
There is no role for NHS Grampian or the Council to independently
sanction or veto decisions of the IJB. 
2.1.6 The IJB will create such Committees that it requires to assist it with the
planning and delivery of Integrated Services. 
2.1.7 The IJB is a statutory partner in the Community Planning Partnership in
terms of s.4(1) and Schedule 1 of the Community Empowerment
(Scotland) Act 2015 and as such will be a member of the Community
Planning Board and shall, along with the other statutory partners, report
to the Community Planning Board. The IJB shall assist in the identification
of priorities for the Community Planning Board’s strategic partnerships as
appropriate. 
Page 35

Page 36

3. Board Governance 
3.1 The arrangements for appointing the voting membership of the IJB in accordance
with the IJB Order are as follows:- 
3.1.1 The Council shall nominate four councillors; and 
3.1.2 NHS Grampian shall nominate four non-executive directors (if unable
to do so then it must nominate a minimum of three non-executive
directors and one executive director). 
3.1.3 The IJB shall appoint such other voting members as permitted by the
IJB Order as amended, including one member of each of the following
lived experience groups:- 
a) third sector bodies carrying out activities related to health or
social care in the area of the local authority;
b) service users residing in the area of the local authority; and
c) persons providing unpaid care in the area of the local authority. 
3.2 The voting membership of the IJB shall be appointed for a term of up to 3 years
however a member may be reappointed for a further three-year term of Office.
Voting members appointed by the Council and NHS Grampian will cease to be
members of the IJB in the event that they cease to be members of the Council
and NHS Grampian respectively.  Voting Members appointed by the IJB will cease
to be members of the IJB if they no longer represent the interest or sector for
which they were appointed. 
3.3 Provision for the disqualification, resignation and removal of voting members is
set out in the IJB Order. 
3.4 The IJB is required to co-opt non-voting members to the IJB. 
Page 36

Page 37

3.5 The non-voting membership of the IJB is set out in the IJB Order and includes
(subject to any amendment of the IJB Order): 
a) the chief social work officer of the local authority;
b) the Chief Officer, once appointed by the IJB;
c) the proper officer of the integration joint board appointed under section
95 of the Local Government (Scotland) Act 1973;
d) a registered medical practitioner whose name is included in the list of
primary medical services performers prepared by NHS Grampian in
accordance with Regulations made under section 17P of the National
Health Service (Scotland) Act 1978;
e) a registered nurse who is employed by NHS Grampian or by a person or
body with which NHS Grampian has entered into a general medical
services contract; 
f) a registered medical practitioner employed by NHS Grampian and not
providing primary medical services; and
g) a professional representative from Public Health 
and at least one member of each of the following groups: 
h) staff of the constituent authorities engaged in the provision of services
provided under integration functions;
i) third sector bodies carrying out activities related to health or social care in
the area of the local authority;
j) service users residing in the area of the local authority; and
k) persons providing unpaid care in the area of the local authority. 
3.6 NHS Grampian will determine the non-voting representatives listed in d)-f)
above, in accordance with the terms of the IJB Order as amended. 
Page 37

Page 38

3.7 The arrangements for appointing the Chair and Vice Chair of the IJB are as
follows:- 
3.7.1 The first Chair was nominated by the Council. 
3.7.2 The first term of the Chair began on the date the IJB was established
and continued until 30 September 2016 and second term of the Chair
commenced 1 October 2016. 
3.7.3 Further terms of the Chair are for a period of 18 months., 
3.7.4 The Parties are entitled to change the person appointed by them as
Chair or Vice Chair during the appointed period via the appropriate
governance procedures within the Parties.   
3.7.5 After the term of the first Chair came to an end, the Vice Chair
became the next Chair and the outgoing Chair’s organisation then
nominated the next Vice Chair, which the IJB appointed. 
3.7.6 The Parties must alternate which of them is to appoint the Chair in
respect of each successive appointing period. The organisation which
has not nominated the Chair shall nominate the Vice Chair. 
Page 38

Page 39

4. Delegation of Functions 
4.1 The functions that are to be delegated by NHS Grampian to the IJB are set out in
Part 1 of Annex 1 and are subject to the exceptions and restrictions specified or
referred to.  The services to which these functions relate, which are currently
provided by NHS Grampian  and which are to be integrated, are set out in Part 2
of Annex 1. For the avoidance of doubt the functions listed in Part 1 of Annex 1
are delegated only to the extent that they relate to the services listed in Part 2 of
Annex 1 and there are certain services in respect of which functions are
delegated for all age groups and certain services in respect of which functions
are delegated for people over the age of 18 only. 
4.2 The functions that are to be delegated by the Council to the IJB are set out in
Parts 1 and 2 of Annex 2 and are subject to the exceptions and restrictions
specified or referred to.  The services to which the functions set out in Part 1,
which are currently provided by the Local Authority and which are to be
integrated, are set out in Part 3 of Annex 2. For the avoidance of doubt the
functions listed in Part 1 of Annex 2 are delegated only to the extent that they
relate to the services listed in Part 3 of Annex 2 and are provided to persons of 18
years and over. The functions listed in Part 2 of Annex 2 are delegated to the
extent that they relate to the functions listed in part 4 of Annex 2.   
4.3 In the delegation of functions, the Parties recognise that they will require to work
together, and with, the IJB, to achieve the Outcomes. Through local
management, the Parties will put arrangements in place to avoid fragmentation
of services provided to persons under 18 years. In particular, the community
health services for persons under 18 years of age set out in Part 3 of Annex 1
shall be operationally devolved by the Chief Executive of NHS Grampian to the
Chief Officer of the IJB who will be responsible and accountable for the
operational delivery and performance of these services. 
Page 39

Page 40

4.4 In exercising its functions, the IJB must take into account the Parties
requirements to meet their respective statutory obligations, standards set by
government and other organisational and service delivery standards set by the
Parties.  Apart from those functions delegated by virtue of the Scheme, the
Parties retain their distinct statutory responsibilities and therefore also retain
their formal decision-making roles. 
4.5 The delegation of functions from the Parties to the IJB shall not affect the legality
of any contract made between either of the Parties and any third party, which
relates to the delivery of integrated or non-integrated services. The IJB shall be
mindful of the Parties’ contracts and will enter into a joint commissioning
strategy with the Parties. 
4.6 Some Integrated Services may be hosted by the IJB on behalf of other integration
authorities, or some integrated services may be hosted by another integration
authority on behalf of the IJB. The IJB will consider and agree the hosting
arrangements. 
Page 40

Page 41

5. Local Operational Delivery Arrangements 
5.1 The local operational arrangements agreed by the Parties are: 
5.2 The following responsibilities  of the membership of the IJB in relation to
monitoring and reporting on the delivery of Integrated Services on behalf of the
Parties are as follows:- 
5.2.1 The IJB is responsible for the planning of Integrated Services and
achieves this through the Strategic Plan. It issues Directions to the
Parties to deliver services in accordance with the Strategic Plan. 
5.2.2 The IJB will continue to monitor the performance of the delivery of
Integrated services using the Strategic Plan on an ongoing basis
and the Parties will report to the IJB regularly on performance in
implementation of Directions to enable it to do so. 
5.2.3 The IJB is required to publish an annual performance report on
performance to deliver the Outcomes and will share this with the
Parties. 
The IJB makes decisions on matters of strategy, policy and the annual budget as
well as having oversight of, and obtaining assurance on, the performance of
delegated services, including services that it hosts but not including the health
services listed in Annex 4 or services which are hosted by another integration
authority.  NHS Grampian will be responsible for the operational oversight of the
services listed in Annex 4 and already has in place an existing mechanism for the
scrutiny and monitoring of delivery of these services. Appropriate links will be
made between this structure and any governance framework to be put in place
by the IJB in terms of paragraph 5.6 below. 
Page 41

Page 42

5.3 The IJB will take decisions in respect of Integrated Services for which it has
operational oversight. 
5.4 The IJB shall ensure that resources are managed appropriately for the delivery of
Integrated Services for which it has operational oversight, in implementation of
the Strategic Plan.   
5.5 The Parties expect the IJB to develop a governance framework to provide itself
with a mechanism for assurance and monitoring of the management and
delivery of Integrated Services. This will enable scrutiny of performance and
appropriate use of resources. If required, the Parties will support the IJB in the
development of this framework.   
5.7 The Chief Officer is accountable to the IJB for the planning and operational
delivery of the delegated services and the outcomes they achieve.  The Chief
Officer will make decisions which, in their opinion, is required to discharge their
responsibilities for the planning and operational delivery of these delegated
services.  The Parties acknowledge that the Chief Officer’s role in operational
delivery will represent an important means by which closer integration of
services, in accordance with the integration delivery principles specified in the
Act, can be achieved. For the avoidance of doubt, the Chief Officer's role shall
not displace: 
(a) the responsibilities of each Party regarding compliance with Directions
issued by the IJB; or 
(b) the principle that each Party’s governance arrangements must allow that
Party to manage risks relating to service delivery. 
5.8 For Integrated Services that the IJB does not have operational oversight of, the IJB
shall be responsible for the strategic planning of those services. The IJB shall
Page 42

Page 43

monitor performance of those services in terms of Outcomes delivered by
comparison against the Strategic Plan 
5.9 NHS Grampian and the Council will be responsible for the operational delivery of
Integrated Services in implementation of Directions of the IJB. The Parties shall
provide such information as may be required by the Chief Officer, the IJB and the
Strategic Planning and Commissioning Group to enable the planning, monitoring
and delivery of Integrated Services. 
5.10 NHS Grampian will provide such information as may be reasonably required by
the Chief Officer or the IJB in respect of the delivery of Integrated Services
provided within hospitals that the IJB does not have operational oversight of. 
5.11 NHS Grampian and the IJB will work together to ensure that the planning and
delivery of integrated (and non-integrated) hospital services are consistent. 
Page 43

Page 44

6. Corporate Support Services 
6.1 The Parties recognise that the IJB requires various corporate support services in
order to fully discharge its duties under the Act. 
6.2 The Parties shall identify, and may review, the corporate resources required for
the IJB, including the provision of any professional, technical, or administrative
services for the purpose of preparing a Strategic Plan and carrying out integration
functions. This assessment shall be made available to the IJB. 
6.3 The Parties shall be responsible for ensuring that the IJB has provision of suitable
resources for corporate support to allow it to fully discharge its duties under the
Act. 
6.4 The Parties and the IJB shall reach an agreement in respect of how these services
will be provided to the IJB which will set out the details of the provision. 
6.5 The Parties shall identify and keep under regular review suitable resources for
corporate support for the IJB to allow it to fully discharge its duties under the Act. 
The Parties and the IJB shall agree on the arrangements for future provision,
including specifying how these requirements will be built into the IJB’s annual
budget setting and review process. 
7.  Support for Strategic Planning 
7.1 The Parties shall share, with such other relevant integration authorities, the
necessary activity and financial data for services, facilities or resources that
relate to the planned use of services provided in the Moray area by those
integration authorities for people who live within Moray. 
Page 44

Page 45

7.2 The Strategic Plan is written for the residents of Moray. A number of individuals
may be resident in the area of one integration authority but receive services in
the area of another integration authority.  NHS Grampian will provide support to
enable the appropriate planning of such services for these individuals. This shall
be done in pursuance of the duty prescribed by s30(3) of the Act. 
7.3 The Parties shall consult with the IJB on any plans to change service provision of
non-integrated services which may have a resultant impact on the Strategic Plan. 
Page 45

Page 46

8. Targets and Performance Measurement 
8.1 The Parties shall inform the IJB what performance targets and improvement
measures it considers the IJB should take account of, in the planning and
delivery of delegated functions for which responsibility should transfer
exclusively to the IJB. 
8.2 Where the responsibility for achieving the targets span delegated and non-
delegated services, the Parties and the IJB will work together to deliver these. 
8.3  A set of shared principles for targets, measures and indicators known as a
Performance Framework, will be maintained and agreed by the Parties and the
IJB. This will take into account the Scottish Government’s Guidance on the
Outcomes and the associated core suite of indicators for integration. 
8.4  The performance framework will be underpinned by the Outcomes and will drive
change and improve effectiveness. The framework will be informed by an
assessment of current performance arrangements and the development of a set
of objectives which the framework is intended to achieve.   
Page 46

Page 47

9. Clinical and Professional Governance 
9.1 Outcomes 
9.1.1 The IJB will improve and provide assurance on the Outcomes through its
clinical and professional governance arrangements. The Outcomes are
as follows: 
• People are able to look after and improve their own health and wellbeing
and live in good health for longer.
• People, including those with disabilities or long-term conditions or who
are frail are able to live, as far as reasonably practicable, independently
and at home or in a homely setting in their community.
• People who use health and social care services have positive
experiences of those services, and have their dignity respected.
• Health and social care services are centred on helping to maintain or
improve the quality of life of people who use those services.
• Health and social care services contribute to reducing health
inequalities.
• People who provide unpaid care are supported to look after their own
health and wellbeing, including to reduce any negative impact of their
caring role on their own health and wellbeing.
• People using health and social care services are safe from harm.
• People who work in health and social care services feel engaged with the
work they do and are supported to continuously improve the
information, support, care and treatment they provide.
• Resources are used effectively and efficiently in the provision of health
and social care services. 
9.1.2 The Parties and the IJB will have regard to the integration planning and
delivery principles and will determine the clinical and professional
governance assurances and information required by the IJB to inform the
Page 47

Page 48

development, monitoring and delivery of its Strategic Plan. The Parties
will provide that assurance and information to the IJB. 
9.2 General Clinical and Professional Governance Arrangements 
9.2.1 The Parties and the IJB are accountable for ensuring appropriate clinical
and professional governance arrangements for their duties under the Act. 
9.2.2 The Parties remain responsible for the clinical and professional
governance of the services which the IJB has instructed the Parties to
deliver. 
9.2.3 The Parties remain responsible for the assurance of the quality and safety
of services commissioned from the third and independent sectors in line
with the requirements set out in the Strategic Plan. 
9.2.4 The IJB will have regard to healthcare and social care governance quality
aims and risks when developing and agreeing its Strategic Plan and its
corresponding Directions to the Parties.  These risks may be identified by
either of the Parties or the IJB and may include professional risks. 
9.2.5 The Parties and the IJB will establish an agreed approach to measuring
and reporting to the IJB on the quality of service delivery, organisational
and individual care risks, the promotion of continuous improvement and
ensuring that all professional and clinical standards, legislation and
guidance are met. This will be set out in a report to the IJB for it to
approve. 
9.3 Clinical and Professional Governance Framework 
9.3.1 NHS Grampian seeks assurance in the area of clinical governance,
quality improvement and clinical risk from the NHS Grampian Clinical
Page 48

Page 49

Governance Committee, through a process of constructive challenge. The
NHS Grampian Clinical Governance Committee is responsible for
demonstrating compliance with statutory requirements in relation to
clinical governance, authorising an accurate and honest annual clinical
governance statement and responding to scrutiny and improvement
reports by external bodies such as Healthcare Improvement Scotland (or
any successor). To achieve this, the Committee oversees a governance
framework including a strategy, annual work programme, infrastructure of
governance groups and an annual report. 
9.3.2 The Council is required by law to appoint a Chief Social Work Officer to
oversee and make decisions in relation to specified social work services,
some of which are delegated in relation to integration functions, and to
report to and alert the Council and elected members of any matters of
professional concern in the management and delivery of those functions.
He or she has a duty to make an annual report to the Council in relation to
the discharge of the role and responsibilities. The Chief Social Work
Officer will be a non-voting member of the IJB. If required, he or she shall
make an annual report to the IJB in relation to the aspects of his or her
position which relate to the delivery of integrated functions. The Chief
Social Work Officer will retain all of the statutory decision-making and
advisory powers given by statute and guidance, and the Medical Director
and Executive  Director of Nursing and Midwifery shall not be entitled to
countermand or over-rule any decisions or instructions given by the Chief
Social Work Officer in carrying out that statutory role. 
9.3.3 External scrutiny is provided by the Care Inspectorate (Social Care and
Social Work Improvement Scotland) (or any successor), which regulates,
inspects and supports improvement of adult social work and social care. 
9.3.4 The Scottish Government’s Clinical and Care Governance Framework for
Integrated Health and Social Care Services in Scotland, 2014 (or any
Page 49

Page 50

updated version or replacement) outlines the proposed roles,
responsibilities and actions that will be required to ensure governance
arrangements in support of the Act’s integration planning and delivery
principles and the required focus on improved Outcomes. 
9.4 Staff Governance 
9.4.1 The Parties will ensure that staff working in Integrated Services have the
right training and education required to deliver professional standards of
care and meet any professional regulatory requirements. 
9.4.2 The IJB and the Parties shall ensure that staff will be supported if
they raise concerns relating to practice that endangers the safety of
service users and other wrong doing in line with local policies and
regulatory requirements. There are three main Whistleblowing policies
relevant to the IJB: the National Whistleblowing Standards, the Council’s
Whistleblowing Policy and the IJB’s Whistleblowing Policy: 
▪ National Whistleblowing Standards have been produced by the
Independent National Whistleblowing Officer’s Department and
came into effect on 1 April 2021. Whistleblowing Concerns can be
raised by anyone who is (or has been) providing services for the
NHS or working to provide services with NHS staff. 
▪ Moray Council Whistleblowing Policy -This policy applies to all
employees and workers, including agency staff, workers who are
self-employed, sub-contractors and workers employed by an
outsourced contractor providing Council services. 
▪ IJB Whistleblowing Policy - This Policy relates to all IJB Members
and Office Holders of the Board and is committed to dealing
responsibly, openly and professionally with any genuine concerns
Page 50

Page 51

held by staff of the Moray Health and Social Care Partnership,
Members of the Board or Office Holders, encouraging them to
report any concerns about wrongdoing or malpractice within the
IJB, which they believe has occurred. The aim of this policy is to
ensure that staff and Members are fully aware of the types of
matters that they should report and the reporting procedure they
should follow to raise any genuine concerns about any possible
wrongdoing or malpractice, at an early stage, without fear of
penalty or victimisation. 
9.4.3 Staff employed by NHS Grampian are bound to follow the NHS
Staff Governance Standard. This standard is recognised as being very
laudable and the IJB will encourage it to be adopted for all staff involved in
the delivery of delegated services. The Staff Governance Standard
requires all Health Boards to demonstrate that staff are: 
• Well informed;
• Appropriately trained and developed;
• Involved in decisions which affect them;
• Treated fairly and consistently, with dignity and respect, in an
environment where diversity is valued; and
• Provided with a continuously improving and safe working
environment, promoting the health and wellbeing of staff, patients,
and the wider community. 
9.4.4 The Standard places a reciprocal duty on staff to: 
• Keep themselves up to date with developments relevant to their job
within the organisation;
• Commit to continuous personal and professional development; 
• Adhere to the standards set by their regulatory bodies;
Page 51

Page 52

• Actively participate in discussions on issues that affect them either
directly or via their trade union/professional organisation; 
• Treat all staff and patients with dignity and respect while valuing
diversity; and 
• Ensure that their actions maintain and promote the health, safety and
wellbeing of all staff, patients, carers and those with lived experience. 
9.5 Interaction with the IJB, Strategic Planning Commissioning Group and 
Localities 
9.5.1 The IJB has established a Clinical and Care Governance Committee to
oversee the clinical and professional governance arrangements for
Integrated Services. The Clinical and Care Governance Committee brings
together senior professionals representative of the range of professional
groups involved in delivering health and social care services. This
includes at least one lead from each of the Parties senior professional
staff, the Chief Social Work Officer and Executive Director of Nursing and
Midwifery. 
9.5.2 The three professional advisors of the IJB listed at 9.5.5 b)-d) are
members of the Clinical and Care Governance Committee. These
advisors will continue to report to the Medical Director and Executive
Director of Nursing and Midwifery. 
9.5.3  The role, remit and membership of the IJB Clinical and Care Governance
Committee is set out in the IJB’s Scheme of Administration, which may be
reviewed and amended by the IJB. 
9.5.4 The Clinical and Care Governance Committee will provide clinical health
care and professional social work advice to the IJB, the Strategic Planning
and Commissioning Group, the Chief Officer and any professional groups
Page 52

Page 53

established in localities as and when required. This can be done through
the Chair of the Committee (or such other appropriate members)
informing and advising the IJB, the Strategic Planning Group, the Chief
Officer and any other Group, Committee or locality of the IJB as and when
required. 
9.5.5 The IJB and the Chief Officer shall also be able to obtain clinical and
professional advice from the IJB non-voting membership, which shall
include (subject to any amendment of the IJB Order): 
a) The Chief Social Work Officer;
b) A registered medical practitioner whose name is included in the list of
primary medical services performers prepared by NHS Grampian in
accordance with Regulations made under section 17P of the National
Health Service (Scotland) Act 1978;
c) A registered nurse who is employed by NHS Grampian or by a person
or body with which the Health Board has entered into a general
medical services contract; and
d) A registered medical practitioner employed by NHS Grampian and not
providing primary medical services. 
9.5.6 The Clinical and Care Governance Committee will be represented on the
established clinical and professional forums/groups of both the Council
and NHS Grampian to address matters of risk, safety, and quality. The
Clinical and Care Governance Committee is aligned with both Parties
arrangements. 
9.5.7 The Chief Social Work Officer is a member of the Clinical and Care
Governance Committee. The Chief Social Work Officer may report to the
Council to provide any necessary assurance as required.   
Page 53

Page 54

9.5.8  The NHS Grampian Area Clinical Forum (and clinical advisory structure),
Managed Clinical and Care Networks, Local Medical Committees, other
appropriate professional groups, and the Adult and Child Protection
Groups and Committees will be available to provide clinical and
professional advice to the IJB. 
9.6 Professional Leadership 
9.6.1 The Act does not change the professional regulatory framework within
which health and social care professionals work, or the established
professional accountabilities that are currently in place within the NHS
and local government. The Act through drawing together the planning and
delivery of services aims to better support the delivery of improved
outcomes for the individuals who receive care and support across health
and social care. 
9.6.2 Medical Directors and Executive Directors of Nursing and Midwifery are
ministerial appointments made through health boards to oversee
systems of professional and clinical governance within NHS Grampian. 
Their professional responsibilities supersede their responsibilities to their
employer. These Directors continue to hold responsibility for the actions
of NHS Grampian clinical staff who deliver care through Integrated
Services. They, in turn, continue to attend the NHS Grampian Clinical
Governance Committee which oversees the clinical governance
arrangements of all services delivered by health care staff employed by
NHS Grampian. 
9.6.3 In addition to the IJB’s Clinical and Care Governance Committee, advice
can be provided to the IJB and the Strategic Planning and Commissioning
Group through the Clinical Executive Directors of NHS Grampian and the
Chief Social Work Officer of the Council on professional / workforce,
clinical / care and social care / social work governance matters relating to
Page 54

Page 55

the development, delivery, and monitoring of the Strategic Plan, including
the development of integrated service arrangements. The professional
leads of the Parties can provide advice and raise issues directly with the
IJB either in writing or through the representatives that sit on the IJB. The
IJB will respond in writing to these issues where asked to do so by the
Parties. 
9.6.4 The key principles for professional leadership are as follows: 
• Job descriptions will reflect the level of professional responsibility at
all levels of the workforce explicitly;
• The IJB will name the Clinical Lead and ensure representation of
professional representation and assurance from both health and
social care. The Executive Director of Nursing and Midwifery and
Medical Director will continue to have professional managerial
responsibility;
• All service development and redesign will outline participation of
professional leadership from the outset, and this will be evidenced in
all IJB papers;
• The effectiveness of the professional leadership principles will be
reviewed annually. 
10. Chief Officer 
10.1 The IJB shall appoint a Chief Officer in accordance with section 10 of the Act.  The
arrangements in relation to the Chief Officer agreed by the Parties are: 
10.2  An interim Chief Officer may be appointed at the request of the IJB by
arrangements made jointly by the Chief Executives of both Parties in
consultation with the Chair of the IJB. 
Page 55

Page 56

10.3 The Chief Officer will be responsible for the operational management of
Integrated Services, other than the health services listed in Annex 4 or the
services hosted by another integration authority. Further arrangements in
relation to the Chief Officer’s responsibilities for operational management and
strategic planning are set out in a separate document, which the IJB may amend
from time to time. 
10.4  The Chief Officer shall be accountable to the IJB for the management of
Integrated Services for which the IJB has operational oversight. The Chief Officer
may sub-delegate decision making powers that have been delegated by NHS
Grampian and the Council where, in his/her opinion, it is appropriate and
legitimate to do so. 
10.5 The Chief Officer will be responsible for the development and monitoring of
operational plans which set out the mechanism for the delivery of the Strategic
Plan. 
10.6 The Chief Executive of NHS Grampian will be the Accountable Officer for the
delivery of the acute services that the IJB has strategic planning responsibility for
and will provide updates to the Chief Officer on the operational delivery of those
services provided and the set aside budget on a regular basis. 
10.8 The Chief Officer will be a member of the appropriate senior management teams
of NHS Grampian and the Council. This will enable the Chief Officer to work with
senior management of both Parties to carry out the functions of the IJB in
accordance with the Strategic Plan. 
10.9  The Chief Officer will be line managed by the Chief Executives of the Parties. The
Chief Officer shall also report to the IJB. 
10.10 The Chief Officer will develop close working relationships with elected members
of the Council and non-executive and executive NHS Grampian board members.
Page 56

Page 57

10.11 The Chief Officer will establish and maintain effective working relationships with
a range of key stakeholders across NHS Grampian, the Council, the third and
independent sectors, communities, service users, carers and those with lived
experience, the Scottish Government, trade unions and relevant professional
organisations. 
10.12 The Chief Officer will work with trade unions, staff side representatives and
professional organisations to ensure a consistent approach to their continued
involvement in the integration of health and social care. 
11. Workforce 
11.1 The arrangements in relation to their respective workforces agreed by the Parties
are: 
11.2   The employment status of staff will not change as a result of the Scheme i.e. staff
will continue to be employed by their current employer and retain their current
terms and conditions of employment and pension status. 
11.3 The Parties will develop and maintain an Integrated Workforce Plan that will be
aligned to objectives set by the IJB. The Integrated Workforce Plan will relate to
the development and support to be provided to the workforce who are employed
in pursuance of Integrated Services and functions. The plan will cover staff
communication, staff engagement, staff and team development, leadership
development and the training needs for staff that will be responsible for
managing integrated teams. 
11.5  The Organisational Development strategy for the Parties and the IJB will be
informed by Employee Engagement processes being followed as part of the
Integrated Workforce Plan. This will encourage the development of a healthy
Page 57

Page 58

organisational culture. The Parties and the IJB will work together in developing
this plan along with stakeholders. 
11.6   These plans will be presented to the IJB for approval in a three year cycle and will
be reviewed regularly through an agreed process to ensure that it takes account
of the development needs of staff. 
12.  Finance 
12.1 Financial Governance 
12.1.1 The IJB will have no cash transactions and will not directly engage or
provide grants to third parties. 
12.1.2 The IJB will have appropriate assurance arrangements in place (detailed
in the Strategic Plan) to ensure best practice principles are followed by
the Parties for the commissioned services. 
12.1.3 The IJB will be responsible for establishing adequate and proportionate
internal audit service for review of the arrangements for risk
management, governance, and control of the delegated resources. The
IJB will accordingly appoint an Internal Auditor to report to the Chief
Officer and IJB on the proposed annual audit plan, ongoing delivery of
the plan, the outcome of each review and an annual report on delivery of
the plan. 
12.1.4 The Accounts Commission will confirm the external auditors for the IJB. 
12.1.5 Further details of financial governance and financial regulations are
contained in a separate document out with the Scheme. 
12.2 Payments to the IJB – General
Page 58

Page 59

12.2.1 The payment made by each Party is not an actual cash transaction for
the IJB. There will be a requirement for an actual cash transfer to be
made between the Parties to reflect the difference between the payment
being made by a Party and the resources delegated by the IJB to that
Party to deliver services. Any cash transfer will take place between the
Parties monthly in arrears based on the annual budgets set by the
Parties and the directions from the IJB. A final transfer will be made at
the end of the financial year on closure of the annual accounts of the IJB
to reflect in-year budget adjustments agreed. 
12.2.2 Resource Transfer – The existing resource transfer arrangements will
cease upon establishment of the IJB and instead NHS Grampian will
include the equivalent sum in its budget allocation to the IJB. The
Council payment to the IJB will accordingly be reduced to reflect this
adjustment. 
12.2.3 Value Added Tax (VAT) – the budget allocations made will reflect the
respective VAT status and treatments of the Parties. In general terms
budget allocations by the Council will be made net of tax to reflect its
status as a Section 33 body in terms of the Value Added Tax Act 1994
and those made by NHS Grampian will be made gross of tax to reflect its
status as a Section 41 body in terms of the Value Added Tax Act 1994. 
12.3 Payments to the IJB 
12.3.1  The payment that will be determined by each Party requires to be agreed
in advance of the start of the financial year.  Each Party agrees that the
baseline payment to the IJB for delegated functions will be formally
advised to the IJB and the other Party by 28th February each year. 
Page 59

Page 60

12.3.2  The Chief Officer and the Chief Finance Officer of the IJB will develop a
case for the Integrated Budget based on the Strategic Plan and present it
to the Council and NHS Grampian for consideration as part of the annual
budget setting process, in accordance with the timescales contained
therein. The case should be evidence based with full transparency on its
assumptions and analysis of changes, covering factors such as activity
changes, cost inflation, efficiencies, legal requirements, transfers to /
from the “set aside” budget for hospital services and equity of resource
allocation. 
12.3.3  The final payment into the IJB will be agreed by the Parties in accordance
with their own processes for budget setting. 
12.3.4  The IJB will approve and provide direction to the Parties by 31st March
each year regarding the functions that are being directed, how they are
to be delivered and the resources to be used in delivery. 
12.4 Method for determining the amount set aside for hospital services 
12.4.1  The IJB will be responsible for strategic planning, in partnership with the
hospital sector, of those hospital services most commonly associated
with the emergency care pathway. 
12.4.2  The IJB and the hospital sector will agree a method for establishing the
amount to be set aside for services that are delivered in a large hospital
as part of the emergency care pathway which will show consumption by
the residents of the IJB. 
12.4.3  The method of establishing the set aside budget will take account of
hospital activity data and cost information.  Hospital activity data will
reflect actual occupied bed day and admissions information, together
with any planned changes in activity and case mix.
Page 60

Page 61

12.5 Financial Management of the IJB 
12.5.1 The Council will host the financial transactions specific to the IJB.  
12.5.2 The IJB will appoint a Chief Finance Officer who will be accountable for
the annual accounts preparation (including gaining the assurances
required for the governance statement) and financial planning (including
the financial section of the Strategic Plan) and will provide financial
advice and support to the Chief Officer and the IJB. The Chief Finance
Officer will also be responsible for the production of the annual financial
statement (in accordance with section 39 of the Act) 
12.5.3 As part of the process of preparing the annual accounts of the IJB the
Chief Finance Officer of the IJB will be responsible for agreeing balances
between the IJB and Parties at the end of the financial year and for
agreeing details of transactions between the IJB and Parties during the
financial year.  The Chief Finance Officer of the IJB will also be
responsible for provision of other information required by the Parties to
complete their annual accounts including Group Accounts. 
12.5.4 Recording of all financial information in respect of the Integrated
Services will be in the financial ledger of the Party which is delivering the
services on behalf of the IJB. 
12.5.5 The Parties will provide the required financial administration to enable
the transactions for delegated functions (e.g. payment of suppliers,
payment of staff, raising of invoices etc.) to be administered and
financial reports to be provided to the Chief Finance Officer of the IJB.
The Parties will not charge the IJB for this service. 
12.6 Financial reporting to the IJB and the Chief Officer
Page 61

Page 62

12.6.1 Financial reports for the IJB will be prepared by the Chief Finance Officer
of the IJB. The format and frequency of the reports to be agreed by the
IJB, the Council and NHS Grampian, but will be at least on a quarterly
basis. The Director of Finance of NHS Grampian and the Section 95
Officer of the Council will work with the Chief Finance Officer of the IJB
to ensure that the information that is required to produce such reports
can be provided. 
12.6.2 To assist with the above the Parties will provide information to the Chief
Finance Officer of the IJB regarding costs incurred by them on a quarterly
basis for services directly managed by the IJB. Similarly, NHS Grampian
will provide the IJB with information on use of the amounts set aside for
hospital services. This information will focus on patient activity levels
and not include unit costs; the frequency will be agreed with the IJB but
will be at least quarterly.
12.6.3 
12.6.4 The Chief Finance Officer of the IJB will agree a timetable for the
preparation of the annual accounts with the Director of Finance of NHS
Grampian and the Section 95 Officer of the Council. 
12.6.5 
12.6.6 In order to give assurance to the Parties that the delegated budgets are
being used for their intended purposes, financial monitoring reports will
be produced for the Parties in accordance with timetables to be agreed
at the start of each financial year.  The format of such reports to be
agreed by the Director of Finance of NHS Grampian and the Section 95
Officer of the Council, in conjunction with the Chief Finance Officer of
the IJB. 
12.7 The process for addressing in year variations in the spending of the IJB 
12.7.1 Increases in payment by Parties to the IJB
Page 62

Page 63

12.7.1.1 The Parties may increase in-year the payments to the IJB for the
delegated services with the agreement of the IJB. 
12.7.2 Reductions in payment by Parties to the IJB 
12.7.2.1 The Parties do not expect to reduce the payment to the IJB in-year
unless there are exceptional circumstances resulting in significant
unplanned costs for the Party.  In such exceptional circumstances
the following escalation process would be followed before any
reduction to the in-year payment to the IJB was agreed:- 
a) The Party would seek to manage the unplanned costs
within its own resources, including the application of
reserves where applicable;
b) Each Party would need to approve any decision to seek to
reduce the in-year payment to the IJB;
c) Any final decision would need to be agreed by the Chief
Executives of both Parties and by the Chief Officer of the IJB,
and be ratified by the Parties and the IJB. 
12.7.3 Variations to the planned payments by the IJB 
12.7.3.1 The Chief Officer is expected to deliver the agreed Outcomes
within the total delegated resources of the IJB. Where a forecast
overspend against an element of the operational budget emerges
during the financial year, in the first instance it is expected that the
Chief Officer, in conjunction with the Chief Finance Officer of the
IJB, will agree corrective action with the IJB. 
12.7.3.2 If this does not resolve the overspending issue then the Chief
Officer, the Chief Finance Officer of the IJB and the Director of
Page 63

Page 64

Finance of NHS Grampian and the Section 95 Officer of the
Council must agree a recovery plan to balance the overspending
budget. 
12.7.4 IJB Overspend against payments 
12.7.4.1 In the event that the recovery plan is unsuccessful and an
overspend is evident at the year-end, uncommitted reserves held
by the IJB, in line with the reserves policy, would firstly be used to
address any overspend. 
12.7.4.2 In the event that an overspend is evident following the application
of reserves, the following arrangements will apply for addressing
that overspend:- 
12.7.4.4 In each year in respect of any overspend, either:
a) A single Party may make an additional one-off payment to
the IJB, 
or
b) The Parties may jointly make additional one off payments
to the IJB in order to meet the overspend.  The split of one
off payments between Parties in this circumstance will be
based on each Party’s proportionate share of the baseline
payment to the IJB, regardless of in which arm of the
operational budget the overspend has occurred in. 
12.7.4.5 The recovery plan may include provision for the Parties to recover
any such additional one-off payments from their baseline payment
to the IJB in the next financial year. 
12.7.4.6 The arrangement to be adopted will be agreed by the Parties. 
Page 64

Page 65

12.7.5 IJB underspend against payments 
12.7.5.1 In the event of a forecast underspend the IJB will require to decide
whether this results in a redetermination of payment or whether
surplus funds will contribute to the IJB’s reserves. 
12.7.5.2 The Chief Officer and Chief Finance Officer of the IJB will prepare a
reserves policy for the IJB, which requires the approval of the IJB
and the Director of Finance of NHS Grampian and the Section 95
Officer of the Council. The reserves policy will be reviewed on a
periodic basis. 
12.7.5.3 In the event of a return of funds to the Parties, the split of returned
payments between Parties will be based on each Party’s
proportionate share of the baseline payment to the IJB, regardless
of which arm of the operational budget the underspend occurred
in. 
12.7.6 Planned Changes in Large Hospital Services 
12.7.6.1 The IJB and the hospital sector will agree a methodology for the
financial consequences of planned changes in capacity for set
aside budgets in large hospital services.   
12.7.6.2 Planned changes in capacity for large hospital services will be
outlined in the IJB Strategic Plan.  A financial plan (reflecting any
planned capacity changes) will be developed and agreed that sets
out the capacity and resource levels required for the set aside
budget for the IJB and the hospital sector, for each year.  The
financial plan will take account of :-
- activity changes based on demographic change;
Page 65

Page 66

- agreed activity changes from new interventions; 
- cost behaviour;
- hospital efficiency and productivity targets; and
- an agreed schedule for timing of additional resource / resource
released. 
12.7.6.3  The process for making adjustments to the set aside resource to
reflect variances in performance against plan will be agreed by the
IJB and NHS Grampian .  Changes will not be made in year and any
changes will be made by annual adjustments to the Strategic Plan
of the IJB. 
12.8 Capital 
12.8.1 The use of capital assets in relation to integration functions 
12.8.1.1 Ownership of capital assets will continue to sit with each Party and
capital assets are not part of the payment or “set aside”. 
12.8.1.2 If the IJB decides to fund a new capital asset from revenue funds,
then ownership of the resulting asset shall be determined by the
Parties. 
12.8.1.3 The Strategic Plan will drive the financial strategy and will provide
the basis for the IJB to present proposals to the Parties to influence
capital budgets and prioritisation. 
12.8.1.4 A business case with a clear position on funding is required for any
change to the use of existing assets or proposed use of new assets.
The Chief Officer of the IJB is to develop business cases for capital
investment for consideration by NHS Grampian and the Council as
part of their respective capital planning processes.
Page 66

Page 67

12.8.1.5 The Chief Officer of the IJB will liaise with the relevant officer within
each Party in respect of day-to-day asset related matters including
any consolidation or relocation of operational teams. 
12.8.1.6 It is anticipated that the Strategic Plan will outline medium term
changes in the level of budget allocations for assets used by the IJB
that will be acceptable to the Parties. 
12.8.1.7 Any profits or loss on sale of an asset will be held by the Parties and
not allocated to the IJB. 
12.8.1.8 Depreciation budgets for assets used on delegated functions will
continue to be held by each Party and not allocated to the IJB
operations in scope. 
12.8.1.9 The management of all other associated running costs (e.g.
maintenance, insurance, repairs, rates, utilities) will be subject to
local agreement between the Parties and the IJB. 
13. Participation and Engagement 
13.1 A joint consultation on the Scheme took place before it was first put in place and
when it was subsequently revised. Whenever the Scheme is reviewed in future,
there will be further joint consultation. 
13.2 Media notifications will be issued for members of the public that reside within
Moray.  Staff will be alerted to the proposed revisions to the scheme. An email
address will be supplied for people to send their views. 
13.3 The consultation draft revised Scheme will then be presented to NHS Grampian
and elected members of the Council.
Page 67

Page 68

13.4 Principles endorsed by the Scottish Health Council and the National Standards
for Community Engagement were followed in respect of the consultation
process, which included the following:   
13.4.1 It was a genuine consultation exercise: the views of all participants
were valued;
13.4.2 It was transparent: the results of the consultation exercise were 
published;
13.4.3 It was an accessible consultation: the consultation documentation
was provided in a variety of formats;
13.4.4 It was being led by the Chief Officer: the Chief Officer and the IJB will
be answerable to the people of Moray in terms of the content of the
revised Scheme;
13.4.5 It is an on-going dialogue: the revised Scheme will establish the
parameters of the future strategic plans of the IJB. 
13.5 The stakeholders consulted in the development of this revised Scheme were: 
• Health professionals;
• Users of health care;
• Carers of users of health care;
• Commercial providers of health care;
• Non-commercial providers of health care;
• Social care professionals;
• Users of social care;
• Future users of social care;
• Carers of users of social care;
• Commercial providers of social care;
• Non-commercial providers of social care;
• Staff of NHS Grampian and the Council who are not health professionals
or social care professionals;
Page 68

Page 69

• Non-commercial providers of social housing; and
• Third sector bodies carrying out activities related to health or social care
and;
• Other local authorities operating with the area of NHS Grampian preparing
an integration scheme. 
13.6 The Parties enabled the IJB to develop a Communications and Engagement
Strategy by providing appropriate resources and support. The Communications
and Engagement Strategy ensures significant engagement with, and
participation by, members of the public, representative groups and other
organisations in relation to decisions about the carrying out of integration
functions. The Parties will encourage the IJB to access existing forums that the
Parties have established, such as Public Partnership Forums, Community
Councils, groups and other networks and stakeholder groups with an interest in
health and social care. 
14. Information Sharing and Confidentiality 
14.1  The Parties have agreed to an appropriate information sharing accord and
procedures for the sharing of information in relation to Integrated Services. The
information sharing accord sets out the principles, policies, procedures and
management strategies around which information sharing is carried out. It
encapsulates national and legal requirements. 
14.2 The Parties will work together to progress the specific arrangements, practical
policies and procedures, designated responsibilities and any additional
requirements for any purpose connected with the preparation of an integration
scheme, the preparation of a strategic plan or the carrying out of integration
functions.   
14.4 If the Parties consider that a further high-level accord or information sharing
protocol is required, or if amendments are necessary to existing ones, they shall
Page 69

Page 70

assist the Parties and the IJB by preparing these and making them available with
their recommendation to the IJB in the first instance for comment. 
14.5   The information sharing accord and procedures may be amended or replaced by
agreement of the Parties and the IJB. 
14.6  The Parties will continue to develop information technology systems and
procedures to enable information to be shared appropriately and effectively
between the Parties and the IJB. 
Page 70

Page 71

15. Complaints 
15.1  The Parties agree the following arrangements in respect of complaints: 
15.2  Complaints should continue to be made to the Council and NHS Grampian using
the existing mechanisms. 
15.3 Complaints can be made to the Parties through any member of staff providing
Integrated Services. Complaints can be made in person, by telephone, by email,
or in writing. On completion of the complaints procedure, complainants may ask
for a review of the outcome. At the end of the complaints process, complainants
are entitled to take their complaint to the Scottish Public Services Ombudsman
(or any such successor).  Where appropriate, complainants will also be advised
of their right to complain to the Care Inspectorate. 
15.4 The Parties shall communicate with each other in relation to any complaint
which requires investigation or input from the other organisation. This shall
ensure that complaints procedures operate smoothly and in an integrated and
efficient manner for the benefit of the complainant. 
15.5  The Chief Officer will have an overview of complaints made about integrated
services and subsequent responses. Complaints about Integrated Services will
be recorded and reported to the Chief Officer on a regular and agreed basis. 
15.6  Complaints will be used as a valuable tool for improving services and to identify
areas where further staff training may be of benefit. 
15.7 The Parties will ensure that all staff working in the provision of Integrated
Services are familiar with the complaints procedures and that they can direct
individuals to the appropriate complaints procedures. 
Page 71

Page 72

15.8  The complaints procedures will be clearly explained, well-publicised,
accessible, will allow for timely recourse and will sign-post independent
advocacy services. 
15.9  The Parties will aspire to have a streamlined and integrated process for
complaints and will work to ensure that any future arrangements for complaints
are clear and integrated from the perspective of the complainant. When this is
achieved, the Scheme will be amended using the procedure required by the
Act. 
15.10   In developing a streamlined and integrated process for complaints, the Parties
shall ensure that all statutory requirements will continue to be met, including
timescales for responding to complaints. 
15.11  In developing a single complaints process, the Parties will endeavour to develop
a uniform way to review unresolved complaints before signalling individuals to
the appropriate statutory review authority. 
Page 72

Page 73

16. Claims Handling, Liability & Indemnity 
16.1 The Parties and the IJB recognise that they could receive a claim arising from or
which relates to the work undertaken on behalf of the IJB. 
16.2 The Parties agree to ensure that any such claims are progressed quickly and in a
manner which is equitable between them. 
16.3 So far as reasonably practicable the normal common law and statutory rules
relating to liability will apply. 
16.4 Each party will assume responsibility for progressing and determining any claim
which relates to any act or omission on the part of one of their employees. 
16.5 Each party will assume responsibility for progressing and determining any claim
which relates to any heritable property which is owned by them. If there are any
heritable properties owned jointly by the Parties, further arrangements for
liability will be agreed upon in consultation with insurers. 
16.6 In the event of any claim against the IJB or in respect of which it is not clear which
party should assume responsibility then the Chief Officer (or his/her
representative) will liaise with the Chief Executives of the Parties (or their
representatives) and determine which party should assume responsibility for
progressing the claim. 
16.7 If a claim is settled by either party, but it subsequently transpires that liability
rested with the other party, then that party shall indemnify the party which
settled the claim. 
16.8 Claims regarding policy and/or strategic decisions made by the IJB shall be the
responsibility of the IJB. The IJB may require to engage independent legal advice
for such claims. 
Page 73

Page 74

16.9 If a claim has a “cross boundary” element whereby it relates to another
integration authority area, the Chief Officers of the integration authorities
concerned shall liaise with each other until an agreement is reached as to how
the claim should be progressed and determined.   
16.10 The IJB will develop a procedure for claims relating to hosted services with the
other relevant integration authorities. Such claims may follow a different
procedure than as set out above. 
16.11 Claims which pre-date the establishment of the IJB will be dealt with by the
Parties through the procedures used by them prior to integration. 
Page 74

Page 75

17. Risk Management 
17.1 A shared risk management strategy is in place, which includes risk monitoring
and a reporting process for the Parties and the IJB. This will be updated as
needed and particularly when the Scheme is revised and any additional
functions delegated so that it is updated by the time such functions are
delegated to the IJB. In developing this shared risk management strategy, the
Parties reviewed the shared risk management arrangements in operation,
including the Parties own Risk Registers. 
17.2 There will be shared risk management across the Parties and the IJB for
significant risks that impact on integrated service provision. The Parties and the
IJB will consider these risks as a matter of course and notify each other where
the risks may have changed. 
17.3 The Parties will provide the IJB with support, guidance, and advice through their
respective Risk Managers, to enable the IJB to maintain an ongoing fit for purpose
risk management strategy to ensure that the risk management of the IJB is
delivered to a high standard. 
17.4 Any changes to the risk management strategy shall be requested through formal
paper to the IJB. 
17.5 A single Risk Register has been developed for the IJB. The process used in
developing a single Risk Register was to involve members of the IJB establishing
a risk framework by identifying risks to the development of the Strategic Plan.
This risk framework in turn was used by operational units of Integrated Services
and each unit was required to contribute towards the Risk Register by identifying
relevant risks and mitigation of those risks. 
Page 75

Page 76

17.6 The single Risk Register will continue to be developed alongside the Strategic
Plan, and will be modified as necessary in line with the development of the
Strategic Plan. 
18. Dispute resolution mechanism 
18.1 This provision relates to disputes between NHS Grampian and the Council in
respect of the IJB or their duties under the Act. This provision does not apply to
internal disputes within the IJB. 
18.2 Where either of the Parties fails to agree with the other on any issue related to the
Scheme and/or the delivery of integrated health and social care services, then
they will follow the process as set out below: 
(a) The Chief Executives of NHS Grampian and the Council and the Chief
Officer of the IJB will meet to resolve the issue;
(b) If unresolved, NHS Grampian and the Council and the IJB will each
prepare a written note of their position on the issue and exchange it with
the others within 21 calendar days of the meeting in (a);
(c) Within 14 calendar days of the exchange of written notes in (b) the Chief
Executives and Chief Officer must meet to discuss the written positions. 
(d) In the event that the issue remains unresolved, the Chief Executives and
the Chief Officer will proceed to mediation with a view to resolving the
issue. The Chief Officer will appoint a professional independent mediator.
The cost of mediation, if any, will be split equally between the Parties. The
mediation process will commence within 28 calendar days of the meeting
in (c);
(e) Where the issue remains unresolved after following the processes
outlined in (a)-(d) above and if mediation does not allow an agreement to
be reached within 6 months from its commencement, or any other such
time as the parties may agree, either party may notify Scottish Ministers
that agreement cannot be reached;
Page 76

Page 77

(f) Where the Scottish Ministers make a determination on the dispute, that
determination shall be final and the Parties and the IJB shall be bound by
the determination. 
Page 77

Page 78

Annex 1
Part 1
Functions delegated by NHS Grampian to the Integration Joint Board 
The functions which are to be delegated by NHS Grampian  to the Integration Joint Board
are set out in this Part 1 of Annex 1 and are subject to the exceptions and restrictions
specified or referred to. The services to which these functions relate are set out in Part 2
of this Annex 1. 
Functions prescribed for the purposes of section 1(8) of the Act 
Column A Column B 
The National Health Service (Scotland) Act 1978 
All functions of Health Boards
conferred by, or by virtue of, the
National Health Service (Scotland) Act
1978
Except functions conferred by or by
virtue of— 
section 2(7) (Health Boards); 
section 2CB(1) (Functions of Health
Boards outside Scotland); 
section 9 (local consultative
committees); 
section 17A (NHS Contracts); 
section 17C (personal medical or
dental services); 
section 17I(2) (use of accommodation); 
(1) Section 2CB was inserted by S.S.I. 2010/283, regulation 3(2). 
(2) Section 17I was inserted by the National Health Service (Primary Care) Act
1997 (c.46), Schedule 2 and amended by the Primary Medical Services (Scotland) Act
2004 (asp 1), section 4.  The functions of the Scottish Ministers under section 17I are
conferred on Health Boards by virtue of S.I. 1991/570, as amended by S.S.I. 2006/132.
Page 78

Page 79

section 17J (Health Boards’ power to
enter into general medical services
contracts); 
section 28A (remuneration for Part II
services); 
section 38(3) (care of mothers and
young children); 
section 38A(4) (breastfeeding); 
section 39(5) (medical and dental
inspection, supervision and treatment
of pupils and young persons); 
section 48 (provision of residential and
practice accommodation); 
section 55(6) (hospital accommodation
on part payment); 
section 57 (accommodation and
services for private patients); 
section 64 (permission for use of
facilities in private practice); 
(3) The functions of the Secretary of State under section 38 are conferred on
Health Boards by virtue of S.I. 1991/570.
(4) Section 38A was inserted by the Breastfeeding etc (Scotland) Act 2005 (asp 1),
section 4.  The functions of the Scottish Ministers under section 38A are conferred on
Health Boards by virtue of S.I.  1991/570 as amended by S.S.I. 2006/132.
(5) Section 39 was relevantly amended by the Self Governing Schools etc
(Scotland) Act 1989 (c.39) Schedule 11; the Health and Medicines Act 1988 (c.49)
section 10 and Schedule 3 and the Standards in Scotland’s Schools Act 2000 (asp 6),
schedule 3.
(6) Section 55 was amended by the Health and Medicines Act 1988 (c.49), section
7(9) and Schedule 3 and the National Health Service and Community Care Act 1990
(c.19), Schedule 9.  The functions of the Secretary of State under section 55 are 
conferred on Health Boards by virtue of S.I. 1991/570. 
Page 79

Page 80

section 75A(7) (remission and
repayment of charges and payment of
travelling expenses); 
section 75B(8) (reimbursement of the
cost of services provided in another
EEA state); 
section 75BA (9) (reimbursement of the
cost of services provided in another
EEA state where expenditure is
incurred on or after 25 October 2013); 
section 79 (purchase of land and
moveable property); 
section 82(10) use and administration of
certain endowments and other
property held by Health Boards); 
section 83(11) (power of Health Boards
and local health councils to hold
property on trust); 
section 84A(12) (power to raise money,
etc., by appeals, collections etc.); 
section 86 (accounts of Health Boards
and the Agency); 
(7) Section 75A was inserted by the Social Security Act 1988 (c.7), section 14, and
relevantly amended by S.S.I. 2010/283.  The functions of the Scottish Ministers in
respect of the payment of expenses under section 75A are conferred on Health Boards
by S.S.I. 1991/570.
(8) Section 75B was inserted by S.S.I. 2010/283, regulation 3(3) and amended by
S.S.I. 2013/177.
(9) Section 75BA was inserted by S.S.I. 2013/292, regulation 8(4).
(10) Section 82 was amended by the Public Appointments and  Public Bodies etc.
(Scotland) Act 2003 (asp 7) section 1(2) and the National Health Service Reform
(Scotland) Act 2004 (asp 7), schedule 2.
(11) There are amendments to section 83 not relevant to the exercise of a Health
Board’s functions under that section.
(12) Section 84A was inserted by the Health Services Act 1980 (c.53), section 5(2). 
There are no amendments to section 84A which are relevant to the exercise of a
Health Board’s functions. 
Page 80

Page 81

section 88 (payment of allowances and
remuneration to members of certain
bodies connected with the health
services); 
section 98 (13) (charges in respect of
non-residents); and 
paragraphs 4, 5, 11A and 13 of
Schedule 1 to the Act (Health Boards); 
and functions conferred by— 
The National Health Service (Charges
to Overseas Visitors) (Scotland)
Regulations 1989 (14); 
The Health Boards (Membership and
Procedure) (Scotland) Regulations
2001; 
The National Health Service (Clinical
Negligence and Other Risks Indemnity
Scheme) (Scotland) Regulations 2000; 
The National Health Services (Primary
Medical Services Performers Lists)
(Scotland) Regulations 2004;
National Health Service (Primary
Medical Services Section 17C
Agreements) (Scotland) Regulations
2018.1516 
(13) Section 98 was amended by the Health and Medicines Act 1988 (c.49), section
7.  The functions of the Secretary of State under section 98 in respect of the making,
recovering, determination and calculation of charges in accordance with regulations
made under that section is conferred on Health Boards by virtue of S.S.I. 1991/570. 
(14) S.I. 1989/364, as amended by S.I. 1992/411; S.I. 1994/1770; S.S.I. 2004/369;
S.S.I. 2005/455; S.S.I. 2005/572 S.S.I. 2006/141; S.S.I. 2008/290; S.S.I. 2011/25 and
S.S.I. 2013/177.
(15) Words substituted by National Health Service (Primary Medical Services Section 17C Agreements)
(Scotland) Regulations 2018/67 (Scottish SI) Sch.8 para.6(2) (April 1, 2018)
(16) As relevantly amended by S.S.I. 2004/217; S.S.I. 2010/395; and S.S.I. 2011/55.
Page 81

Page 82

The National Health Service (Discipline
Committees) (Scotland) Regulations
2006; 
The National Health Service (General
Ophthalmic Services) (Scotland)
Regulations 2006; 
The National Health Service
(Pharmaceutical Services) (Scotland)
Regulations 2009; 
The National Health Service (General
Dental Services) (Scotland)
Regulations 2010;   
The National Health Service (Free
Prescription and Charges for Drugs and
Appliances) (Scotland) Regulations
2011(17);  
Disabled Persons (Services, Consultation and Representation) Act 1986 
Section 7
(Persons discharged from hospital) 
Community Care and Health (Scotland) Act 2002 
All functions of Health Boards
conferred by, or by virtue of, the
Community Care and Health
(Scotland) Act 2002.   
Mental Health (Care and Treatment) (Scotland) Act 2003 
Except functions conferred by— 
(17) S.S.I. 2011/55, to which there are amendments not relevant to the exercise of
a Health Board’s functions.
Page 82

Page 83

All functions of Health Boards
conferred by, or by virtue of, the Mental
Health (Care and Treatment) (Scotland)
Act 2003.
section 22 (Approved medical
practitioners);
section 34 (Inquiries under section 33:
co-operation)(18); 
section 38 (Duties on hospital
managers: examination notification
etc.)(19); 
section 46 (Hospital managers’ duties:
notification)(20); 
section 124 (Transfer to other hospital); 
section 228 (Request for assessment
of needs: duty on local authorities and
Health Boards); 
section 230 (Appointment of a patient’s
responsible medical officer); 
section 260 (Provision of information to
patients); 
section 264 (Detention in conditions of
excessive security: state hospitals); 
section 267 (Orders under sections 264
to 266: recall); 
section 281(21) (Correspondence of
certain persons detained in hospital); 
(18) There are amendments to section 34 not relevant to the exercise of a Health
Board’s functions under that section.
(19) Section 329(1) of the Mental Health (Care and Treatment) (Scotland) Act 2003
provides a definition of “managers” relevant to the functions of Health Boards under
that Act. 
(20) Section 46 is amended by S.S.I. 2005/465.
(21) Section 281 is amended by S.S.I. 2011/211.
Page 83

Page 84

and functions conferred by— 
The Mental Health (Safety and
Security) (Scotland) Regulations
2005(22); 
The Mental Health (Cross border
transfer: patients subject to detention
requirement or otherwise in hospital)
(Scotland) Regulations 2005(23); 
The Mental Health (Use of Telephones)
(Scotland) Regulations 2005(24); and 
The Mental Health (England and Wales
Cross border transfer: patients subject
to detention requirement or otherwise
in hospital) (Scotland) Regulations
2008(25). 
Education (Additional Support for Learning) (Scotland) Act 2004 
Section 23 
(22) S.S.I. 2005/464, to which there are amendments not relevant to the exercise of
the functions of a Health Board.  Section 329(1) of the Mental Health (Care and
Treatment) (Scotland) Act 2003 provides a definition of “managers” relevant to the
functions of Health Boards.
(23) S.S.I. 2005/467.  Section 329(1) of the Mental Health (Care and Treatment)
(Scotland) Act 2003 provides a definition of “managers” relevant to the functions of
Health Boards.
(24) S.S.I. 2005/468.  Section 329(1) of the Mental Health (Care and Treatment)
(Scotland) Act 2003 provides a definition of “managers” relevant to the functions of
Health Boards.
(25) S.S.I. 2008/356.  Section 329(1) of the Mental Health (Care and Treatment)
(Scotland) Act 2003 provides a definition of “managers” relevant to the functions of
Health Boards.
Page 84

Page 85

(other agencies etc. to help in exercise
of functions under this Act)  
Public Services Reform (Scotland) Act 2010 
All functions of Health Boards
conferred by, or by virtue of, the Public
Services Reform (Scotland) Act 2010
Except functions conferred by— 
section 31(Public functions: duties to
provide information on certain
expenditure etc.); and 
section 32 (Public functions: duty to
provide information on exercise of
functions). 
Patient Rights (Scotland) Act 2011 
All functions of Health Boards
conferred by, or by virtue of, the Patient
Rights (Scotland) Act 2011 
Except functions conferred by The
Patient Rights (Complaints Procedure
and Consequential Provisions)
(Scotland) Regulations 2012/36(26).   
Functions, conferred by virtue of enactments, prescribed for the purposes of
section 1(6) of the Public Bodies (Joint Working) (Scotland) Act 2014 
Column A Column B 
The National Health Service (Scotland) Act 1978 
All functions of Health Boards
conferred by, or by virtue of, the
Except functions conferred by or by
virtue of— 
(26) S.S.I. 2012/36.  Section 5(2) of the Patient Rights (Scotland) Act 2011 (asp 5) provides a
definition of “relevant NHS body” relevant to the exercise of a Health Board’s functions. 
Page 85

Page 86

68 
National Health Service (Scotland) Act
1978
Enactments listed at Column B of the
foregoing list of the Scheme of
functions prescribed for the purposes
of section 1(8) of the Act, in respect of
the National Health Service (Scotland)
Act 1978; 
The Health Boards (Membership and
Procedure) (Scotland)
Regulations 200127; and
The National Health Service
(Appointment of Consultants)
(Scotland) Regulations 200928   
Public Health etc. (Scotland) Act 2008  
Section 2 (duty of Health Boards to
protect public health)
Section 7 (joint public health
protection plans) 
Carers (Scotland) Act 2016 
Section 12
(duty to prepare young carer statement) 
Section 31(29) 
27 To which there are amendments not relevant to the exercise of a Health Board's functions.
28 To which there are amendments not relevant to the exercise of a Health Board's functions.
(29) Inserted by Public Bodies (Joint Working) (Prescribed Health Board Functions) (Scotland)
Amendment Regulations 2017/381 (Scottish SI) reg. 2 (December 18, 2017)
Page 86

Page 87

69 
(Duty to prepare local carer strategy) 
xx 
Part 2
Services currently provided by NHS Grampian which are to be delegated 
A 
Interpretation of this Part 2 of Annex 1 
1.   In this part— 
“Allied Health Professional” means a person registered as an allied health
professional with the Health Professions Council; 
“general medical practitioner” means a medical practitioner whose name is
included in the General Practitioner Register kept by the General Medical
Council; 
“general medical services contract” means a contract under section 17J of the
National Health Service (Scotland) Act 1978; 
“hospital” has the meaning given by section 108(1) of the National Health
Service (Scotland) Act 1978; 
“inpatient hospital services” means any health care service provided to a patient
who has been admitted to a hospital and is required to remain in that hospital
overnight, but does not include any secure forensic mental health services; 
Page 87

Page 88

70 
“out of hours period” has the same meaning as in regulation 2 of the National
Health Service (General Medical Services Contracts) (Scotland) Regulations
2004(30); and 
“the public dental service” means services provided by dentists and dental staff
employed by a health board under the public dental service contract. 
B 
Provision for people over the age of 18 
The functions listed in Part 1 of this Annex 1 are delegated only to the extent that: 
a)  the function is exercisable in relation to persons of at least 18 years of age; 
b)  the function is exercisable in relation to care or treatment provided by health
professionals for the purpose of health care services listed at numbers 2 to 7 below;
and 
c)  the function is exercisable in relation to the following health services: 
2. Accident and Emergency services provided in a hospital. 
3. Inpatient hospital services relating to the following branches of medicine— 
(a) general medicine;
(b) geriatric medicine;
(c) rehabilitation medicine;
(d) respiratory medicine; and
(e) psychiatry of learning disability. 
4. Palliative care services provided in a hospital. 
(30) S.S.I. 2004/115.
Page 88

Page 89

71 
5. Inpatient hospital services provided by general medical practitioners. 
6. Services provided in a hospital in relation to an addiction or dependence on any
substance. 
7. Mental health services provided in a hospital, except secure forensic mental
health services. 
8. District nursing services. 
9. Services provided outwith a hospital in relation to an addiction or dependence on
any substance. 
10. Services provided by allied health professionals in an outpatient department,
clinic, or outwith a hospital. 
11. The public dental service. 
12. Primary medical services provided under a general medical services contract, and
arrangements for the provision of services made under section 17C of the
National Health Service (Scotland) Act 1978, or an arrangement made in
pursuance of section 2C(2) of the National Health Service (Scotland) Act 1978(31). 
13. General dental services provided under arrangements made in pursuance of
section 25 of the National Health (Scotland) Act 1978(32). 
(31) Section 2C was inserted by the Primary Medical Services (Scotland) Act 2004
(asp 1), section 1(2) and relevantly amended by the National Health Service Reform
(Scotland) Act 2004 (asp 7), schedule 1, and the Tobacco and Primary Medical
Services (Scotland) Act 2010 (asp 3), section 37.
(32) Section 25 was relevantly amended by the Smoking, Health and Social Care
(Scotland) Act 2005 (asp 13), section 15.
Page 89

Page 90

72 
14. Ophthalmic services provided under arrangements made in pursuance of section
17AA or section 26 of the National Health Service (Scotland) Act 1978(33). 
15. Pharmaceutical services and additional pharmaceutical services provided under
arrangements made in pursuance of sections 27 and 27A of the National Health
Service (Scotland) Act 1978(34). 
16. Services providing primary medical services to patients during the out-of-hours
period. 
17. Services provided outwith a hospital in relation to geriatric medicine. 
18. Palliative care services provided outwith a hospital. 
19.  Community learning disability services. 
20.  Mental health services provided outwith a hospital. 
21.  Continence services provided outwith a hospital. 
22.  Kidney dialysis services provided outwith a hospital. 
23.  Services provided by health professionals that aim to promote public health. 
(33) Section 17AA was inserted by the National Health Service (Primary Care) Act
1997 (c.46), section 31(2) and relevantly amended by the Smoking, Health and Social
Care (Scotland) Act 2005 (asp 13), section 25. Section 26 was relevantly amended by
the Health and Social Security Act 1984 (c.48), Schedule 1, and the Smoking, Health
and Social Care (Scotland) Act 2005 (asp 13) section 13.
(34) Section 27 was relevantly amended by the Health Services Act 1990 (c.53),
section 20; the National Health Service and Community Care Act 1990 (c.19),
Schedule 9; the Medicinal Products: Prescription by Nurses etc. Act 1992 (c.28),
section 3; the National Health Service and Community Care Act 1997 (c.46), Schedule
2  and the Health and Social Care Act 2001 (c.15), section 44.
Page 90

Page 91

73 
C
Provision for people under the age of 18 
The functions listed in Part 1 of Annex 1 are also delegated to the extent that: 
a)  the function is exercisable in relation to persons of less than 18 years of age; and
b)  the function is exercisable in relation to the following health services: 
25. The public dental service.
26. Primary medical services provided under a general medical services contract, and
arrangements for the provision of services made under section 17C of the
National Health Service (Scotland) Act 1978, or an arrangement made in
pursuance of section 2C(2) of the National Health Service (Scotland) Act 1978(35).
27. General dental services provided under arrangements made in pursuance of
section 25 of the National Health (Scotland) Act 1978(36).
28. Ophthalmic services provided under arrangements made in pursuance of section
17AA or section 26 of the National Health Service (Scotland) Act 1978(37).
29. Pharmaceutical services and additional pharmaceutical services provided under
arrangements made in pursuance of sections 27 and 27A of the National Health
Service (Scotland) Act 1978(38). 
(35) Section 2C was inserted by the Primary Medical Services (Scotland) Act 2004
(asp 1), section 1(2) and relevantly amended by the National Health Service Reform
(Scotland) Act 2004 (asp 7), schedule 1, and the Tobacco and Primary Medical
Services (Scotland) Act 2010 (asp 3), section 37.
(36) Section 25 was relevantly amended by the Smoking, Health and Social Care
(Scotland) Act 2005 (asp 13), section 15.
(37) Section 17AA was inserted by the National Health Service (Primary Care) Act
1997 (c.46), section 31(2) and relevantly amended by the Smoking, Health and Social
Care (Scotland) Act 2005 (asp 13), section 25. Section 26 was relevantly amended by
the Health and Social Security Act 1984 (c.48), Schedule 1, and the Smoking, Health
and Social Care (Scotland) Act 2005 (asp 13) section 13.
(38) Section 27 was relevantly amended by the Health Services Act 1990 (c.53),
section 20; the National Health Service and Community Care Act 1990 (c.19),
Schedule 9; the Medicinal Products: Prescription by Nurses etc. Act 1992 (c.28),
section 3; the National Health Service and Community Care Act 1997 (c.46), Schedule
2  and the Health and Social Care Act 2001 (c.15), section 44.
Page 91

Page 92

74 
Part 3
Services currently provided by NHS Grampian to those under 18 years of age, which
are to be operationally devolved to the Chief Officer of the Integration Joint
Board. 
30. Health Visiting 
31. School Nursing 
32. All services provided by Allied Health Professionals, as defined in Part 2A of this
Annex 1, in an outpatient department, clinic, or outwith a hospital. 
Page 92

Page 93

75 
Annex 2 
Part 1
Functions delegated by the Local Authority to the Integration Joint Board 
The functions which are to be delegated by the Local Authority to the Integration Joint
Board are set out in this Part 1 of Annex 2 and are subject to the exceptions and
restrictions specified or referred to. The services to which these functions relate are set
out in Part 3 of this Annex 2. 
Functions prescribed for the purposes of section 1(7) of the Public Bodies (Joint
Working) (Scotland) Act 2014
Column A
Enactment conferring function
Column B
Limitation 
National Assistance Act 1948(39) 
Section 48
(Duty of councils to provide temporary
protection for property of persons
admitted to hospitals etc.)   
The Disabled Persons (Employment) Act 1958(40)
Section 3 
(39) 1948 c.29; section 48 was amended by the Local Government etc. (Scotland)
Act 1994 (c.39), Schedule 39, paragraph 31(4) and the Adult Support and Protection
(Scotland) Act 2007 (asp 10) schedule 2 paragraph 1.
(40) 1958 c.33; section 3 was amended by the Local Government Act 1972 (c.70),
section 195(6); the Local Government (Scotland) Act 1973 (c.65), Schedule 27; the
National Health Service (Scotland) Act 1978 (c.70), schedule 23; the Local
Government Act 1985 (c.51), Schedule 17; the Local Government (Wales) Act 1994
(c.19), Schedules 10 and 18; the Local Government etc. (Scotland) Act 1994 (c.49),
Schedule 13; and the National Health Service (Consequential Provisions) Act 2006
(c.43), Schedule 1. 
Page 93

Page 94

76 
Column A
Enactment conferring function
Column B
Limitation 
(Provision of sheltered employment by
local authorities)   
The Social Work (Scotland) Act 1968(41) 
Section 1
(Local authorities for the
administration of the Act.) 
So far as it is exercisable in relation to
another integration function. 
(41) 1968 c.49; section 1 was relevantly amended by the National Health Service
(Scotland) Act 1972 (c.58), schedule 7; the Children Act 1989 (c.41), Schedule 15; the
National Health Service and Community Care Act 1990 (c.19) (“the 1990 Act”),
schedule 10; S.S.I. 2005/486 and S.S.I. 2013/211.  Section 4 was amended by the
1990 Act, Schedule 9, the Children (Scotland) Act 1995 (c.36) (“the 1995 Act”),
schedule 4; the Mental Health (Care and Treatment) (Scotland) Act 2003 (asp 13)
(“the 2003 Act”), schedule 4; and S.S.I. 2013/211.  Section 10 was relevantly amended
by the Children Act 1975 (c.72), Schedule 2; the Local Government etc. (Scotland) Act
1994 (c.39), Schedule 13; the Regulation of Care (Scotland) Act 2001 (asp 8) (“the
2001 Act”) schedule 3; S.S.I. 2010/21 and S.S.I. 2011/211.  Section 12 was relevantly
amended by the 1990 Act, section 66 and Schedule 9; the 1995 Act, Schedule 4; and
the Immigration and Asylum Act 1999 (c.33), section 120(2).  Section 12A was inserted
by the 1990 Act, section 55, and amended by the Carers (Recognition and Services)
Act 1995 (c.12), section 2(3) and the Community Care and Health (Scotland) Act 2002
(asp 5) (“the 2002 Act”), sections 8 and 9(1).  Section 12AZA was inserted by the
Social Care (Self Directed Support) (Scotland) Act 2013 (asp 1), section 17.  Section
13 was amended by the Community Care (Direct Payments) Act 1996 (c.30), section
5.  Section 13ZA was inserted by the Adult Support and Protection (Scotland) Act 2007
(asp 10), section 64.  Section 13A was inserted by the 1990 Act, section 56 and
amended by the Immigration and Asylum Act 1999 (c.33), section 102(2); the 2001
Act, section 72 and schedule 3; the 2002 Act, schedule 2 and by S.S.I. 2011/211. 
Section 13B was inserted by the 1990 Act sections 56 and 67(2) and amended by the
Immigration and Asylum Act 1999 (c.33), section 120(3).  Section 14 was amended by
the Health Services and Public Health Act 1968 (c.46), sections 13, 44 and 45; the
National Health Service (Scotland) Act 1972 (c.58), schedule 7; the Guardianship Act
1973 (c.29), section 11(5); the Health and Social Service and Social Security
Adjudications Act 1983 (c.41), schedule 10 and the 1990 Act, schedule 9.  Section 29
was amended by the 1995 Act, schedule 4.  Section 59 was amended by the 1990
Act, schedule 9; the 2001 Act, section 72(c); the 2003 Act, section 25(4) and schedule
4 and by S.S.I. 2013/211.
Page 94

Page 95

77 
Column A
Enactment conferring function
Column B
Limitation 
Section 4
(Provisions relating to performance of
functions by local authorities.)
So far as it is exercisable in relation to
another integration function.
Section 8
(Research.)
So far as it is exercisable in relation to
another integration function. 
Section 10
(Financial and other assistance to
voluntary organisations etc. for social
work.) 
So far as it is exercisable in relation to
another integration function.
Section 12
(General social welfare services of
local authorities.) 
Except in so far as it is exercisable in
relation to the provision of housing
support services.
Section 12A
(Duty of local authorities to assess
needs.) 
So far as it is exercisable in relation to
another integration function.
Section 12AZA
(Assessments under section 12A -
assistance) 
So far as it is exercisable in relation to
another integration function.
Section 13
(Power of local authorities to assist
persons in need in disposal of produce
of their work.) 
Section 13ZA
(Provision of services to incapable
adults.)  
So far as it is exercisable in relation to
another integration function.
Section 13A
(Residential accommodation with
nursing.) 
Page 95

Page 96

78 
Column A
Enactment conferring function
Column B
Limitation 
Section 13B
(Provision of care or aftercare.)   
Section 14
(Home help and laundry facilities.) 
Section 29
(Power of local authority to defray
expenses of parent, etc., visiting
persons or attending funerals.) 
Section 59
(Provision of residential and other
establishments by local authorities
and maximum period for repayment of
sums borrowed for such provision.)  
So far as it is exercisable in relation to
another integration function.
The Local Government and Planning (Scotland) Act 1982(42) 
Section 24(1)
(The provision of gardening assistance
for the disabled and the elderly.) 
Disabled Persons (Services, Consultation and Representation) Act 1986(43) 
Section 2
(Rights of authorised representatives of
disabled persons.) 
(42) 1982 c.43; section 24(1) was amended by the Local Government etc.
(Scotland) Act 1994 (c.39), schedule 13.
(43) 1986 c.33.  There are amendments to sections 2 and 7 which are not relevant
to the exercise of a local authority’s functions under those sections.
Page 96

Page 97

79 
Column A
Enactment conferring function
Column B
Limitation 
Section 3
(Assessment by local authorities of
needs of disabled persons.) 
Section 7
(Persons discharged from hospital.)
In respect of the assessment of need
for any services provided under
functions contained in welfare
enactments within the meaning of
section 16 and which are integration
functions. 
Section 8
(Duty of local authority to take into
account abilities of carer.)
In respect of the assessment of need
for any services provided under
functions contained in welfare
enactments (within the meaning set
out in section 16 of that Act) which are
integration functions.  
The Adults with Incapacity (Scotland) Act 2000(44) 
Section 10
(Functions of local authorities.)   
Section 12
(Investigations.) 
Section 37
(Residents whose affairs may be
managed.) 
Only in relation to residents of
establishments which are managed
under integration functions. 
(44) 2000 asp 4; section 12 was amended by the Mental Health (Care and
Treatment) (Scotland) Act 2003 (asp 13), schedule 5(1). Section 37 was amended by
S.S.I. 2005/465.  Section 39 was amended by the Adult Support and Protection
(Scotland) Act 2007 (asp 10), schedule 1 and by S.S.I. 2013/137.  Section 41 was
amended by S.S.I. 2005/465;  the Adult Support and Protection (Scotland) Act 2007
(asp 10), schedule 1 and S.S.I. 2013/137.  Section 45 was amended by the Regulation
of Care (Scotland) Act 2001 (asp 8), Schedule 3. 
Page 97

Page 98

80 
Column A
Enactment conferring function
Column B
Limitation 
Section 39
(Matters which may be managed.)
Only in relation to residents of
establishments which are managed
under integration functions. 
Section 41
(Duties and functions of managers of
authorised establishment.)
Only in relation to residents of
establishments which are managed
under integration functions. 
Section 42
(Authorisation of named manager to
withdraw from resident’s account.)
Only in relation to residents of
establishments which are managed
under integration functions. 
Section 43
(Statement of resident’s affairs.)
Only in relation to residents of
establishments which are managed
under integration functions. 
Section 44
(Resident ceasing to be resident of
authorised establishment.)
Only in relation to residents of
establishments which are managed
under integration functions. 
Section 45
(Appeal, revocation etc.)
Only in relation to residents of
establishments which are managed
under integration functions.  
The Housing (Scotland) Act 2001(45) 
Section 92
(Assistance for housing purposes.) 
Only in so far as it relates to an aid or
adaptation. 
The Community Care and Health (Scotland) Act 2002(46) 
(45) 2001 asp 10; section 92 was amended by the Housing (Scotland) Act 2006 (asp
1), schedule 7.  
(46) 2002 asp 5.
Page 98

Page 99

81 
Column A
Enactment conferring function
Column B
Limitation 
Section 5
(Local authority arrangements for of
residential accommodation outwith
Scotland.) 
Section 14
(Payments by local authorities towards
expenditure by NHS bodies on
prescribed functions.)   
The Mental Health (Care and Treatment) (Scotland) Act 2003(47) 
Section 17
(Duties of Scottish Ministers, local
authorities and others as respects
Commission.) 
Section 25
(Care and support services etc.)
Except in so far as it is exercisable in
relation to the provision of housing
support services. 
Section 26
(Services designed to promote well-
being and social development.)
Except in so far as it is exercisable in
relation to the provision of housing
support services. 
Section 27
(Assistance with travel.)
Except in so far as it is exercisable in
relation to the provision of housing
support services. 
Section 33
(Duty to inquire.)   
(47) 2003 asp 13; section 17 was amended by the Public Services Reform
(Scotland) Act 2010 (asp 8), section 111(4), and schedules 14 and 17, and by the
Police and Fire Reform (Scotland) Act 2012 (asp 8), schedule 7. Section 25 was
amended by S.S.I. 2011/211. Section 34 was amended by the Public Services Reform
(Scotland) Act 2010 (asp 8), schedules 14 and 17. 
Page 99

Page 100

82 
Column A
Enactment conferring function
Column B
Limitation 
Section 34
(Inquiries under section 33: Co-
operation.) 
Section 228
(Request for assessment of needs:
duty on local authorities and Health
Boards.)   
Section 259
(Advocacy.)   
The Housing (Scotland) Act 2006(48) 
Section 71(1)(b)
(Assistance for housing purposes.)
Only in so far as it relates to an aid or
adaptation.  
The Adult Support and Protection (Scotland) Act 2007(49) 
Section 4
(Council’s duty to make inquiries.) 
Section 5
(Co-operation.) 
Section 6
(Duty to consider importance of
providing advocacy and other.) 
Section 11
(Assessment Orders) 
(48) 2006 asp 1; section 71 was amended by the Housing (Scotland) Act 2010 (asp
17) section 151. 
(49) 2007 asp 10; section 5 and section 42 were amended by the Public Services
Reform (Scotland) Act 2010 (asp 8), schedules 14 and 17 and by the Police and Fire
Reform (Scotland) Act 2012 (asp 8), schedule 7.  Section 43 was amended by the
Public Services Reform (Scotland) Act 2010 (asp 8), schedule 14.
Page 100

Page 101

83 
Column A
Enactment conferring function
Column B
Limitation 
Section 14
(Removal orders.)   
Section 18
(Protection of moved persons
property.) 
Section 22
(Right to apply for a banning order.) 
Section 40
(Urgent cases) 
Section 42
(Adult Protection Committees.) 
Section 43
(Membership)   
Social Care (Self-directed Support) (Scotland) Act 2013(50) 
Section 5
(Choice of options: adults)   
Section 6
(Choice of options under section 5:
assistances) 
Section 7
(Choice of options: adult carers) 
Section 9
(Provision of information about self-
directed support)   
Section 11 
(50) 2013 asp 1.
Page 101

Page 102

84 
Column A
Enactment conferring function
Column B
Limitation 
(Local authority functions)  
Section 12
(Eligibility for direct payment: review) 
Section 13
(Further choice of options on material
change of circumstances)
Only in relation to a choice under
section 5 or 7 of the Social Care (Self-
directed Support) (Scotland) Act 2013. 
Section 16
(Misuse of direct payment: recovery) 
Section 19
(Promotion of options for self-directed
support) 
Carers (Scotland) Act 2016(51) 
Section 6(52)
(Duty to prepare of adult carer support
plan) 
Section 21(53)
(Setting of local eligibility criteria) 
Section 24(54)
(Duty to provide support) 
(51) Section 21 was inserted into the Schedule of the Public Bodies (Joint Working) (Scotland) Act 2014
by paragraph 6 of the schedule of the Carers (Scotland) Act 2016 (asp 9).
(52) Inserted by Public Bodies (Joint Working) (Prescribed Local Authority Functions etc.) (Scotland)
Amendment (No. 2) Regulations 2017/449 (Scottish SI) reg. 3(2) (December 13th 2017)
(53) Inserted by Public Bodies (Joint Working) (Prescribed Local Authority Functions etc.) (Scotland)
Amendment Regulations 2017/190 (Scottish SI) reg. 2(2) (June 16 2017).
(54) Inserted by Public Bodies (Joint Working) (Prescribed Local Authority Functions etc.) (Scotland)
Amendment (No. 2) Regulations 2017/449 (Scottish SI) reg. 3(2) (December 13th 2017)
Page 102

Page 103

85 
Column A
Enactment conferring function
Column B
Limitation 
Section 25(55)
(Provision of support to carers: breaks
from caring) 
Section 31(56)
(Duty to prepare local carer strategy) 
Section 34(57)
(Information and advice service for
carers) 
Section 35(58)
(Short breaks services statements) 
Functions, conferred by virtue of enactments, prescribed for the purposes of section
1(7) of the Public Bodies (Joint Working) (Scotland) Act 2014 
Column A
Enactment conferring function
Column B
Limitation 
The Community Care and Health (Scotland) Act 2002 
(55) Inserted by Public Bodies (Joint Working) (Prescribed Local Authority Functions etc.) (Scotland)
Amendment (No. 2) Regulations 2017/449 (Scottish SI) reg. 3(2) (December 13th 2017)
(56) Inserted by Public Bodies (Joint Working) (Prescribed Local Authority Functions etc.) (Scotland)
Amendment (No. 2) Regulations 2017/449 (Scottish SI) reg. 3(2) (December 13th 2017)
(57) Inserted by Public Bodies (Joint Working) (Prescribed Local Authority Functions etc.) (Scotland)
Amendment (No. 2) Regulations 2017/449 (Scottish SI) reg. 3(2) (December 13th 2017)
(58) Inserted by Public Bodies (Joint Working) (Prescribed Local Authority Functions etc.) (Scotland)
Amendment (No. 2) Regulations 2017/449 (Scottish SI) reg. 3(2) (December 13th 2017)
Page 103

Page 104

86 
Section 4(59)
The functions conferred by Regulation
2 of the Community Care (Additional
Payments) (Scotland) Regulations
2002(60) 
Functions which may be delegated by virtue of section 1(5) of the Public Bodies (Joint
Working) (Scotland) Act 2014 
Column A
Enactment conferring function
Column B
Limitation 
Part 2
Functions delegated by the Local Authority to the Integration Joint Board 
The functions which are to be delegated by the Local Authority to the Integration
Joint Board are set out in this Part 2 of Annex 2 and are subject to the exceptions
and restrictions specified or referred to. 
Functions which may be delegated by virtue of section 1(5) of the Public Bodies
(Joint Working) (Scotland) Act 2014 
Column A
Enactment conferring function
Column B
Limitation 
(59) Section 4 was amended by the Mental Health (Care and Treatment) (Scotland)
Act 2003 (asp 13), schedule 4 and the Adult Support and Protection (Scotland) Act
2007 (asp 10), section 62(3).
(60) S.S.I. 2002/265, as amended by S.S.I. 2005/445.
Page 104

Page 105

87 
National Assistance Act 1948 
Section 45 
(Recovery of expenditure
incurred under Part III of that Act 
where a person has fraudulently 
or otherwise misrepresented or 
failed to disclose a material fact 
Matrimonial Proceedings (Children) Act 1958 
Section 11 
(Reports as to arrangements 
for future care and upbringing of children) 
Social Work (Scotland) Act 1968 
Section 5 
(Performance of functions under 
the guidance of the Secretary of State) 
Section 6B 
(Local authority inquiries
into matters affecting children) 
Section 27 
(Supervision and care of persons 
put on probation or released from 
prisons etc) 
Page 105

Page 106

88 
Section 27ZA 
(Advice, guidance and assistance to 
persons arrested or on whom sentence 
deferred) 
Section 78A 
(Recovery of contributions) 
Section 80 
(Enforcement of duty to make 
contributions) 
Section 81 
(Provisions as to decrees for ailment) 
Section 83 
(Variation of trusts) 
Section 86 
(Adjustments between 
authority providing accommodation etc.,
and authority of area of residence) 
Children Act 1975 
Section 34 
(Access and maintenance) 
Section 39 
(Reports by local 
authorities and probation officers)
Page 106

Page 107

89 
Section 40 
(Notice of application
to be given to local authority) 
Section 50 
(Payments towards 
maintenance of children) 
Health and Social Services and Social Security Adjudications Act 1983 
Section 21 
(Recovery of sums due to local authority 
where persons in residential 
accommodation have disposed of assets) 
Section 22 
(Arrears of contributions charged on 
interest in land in England and Wales) 
Section 23 
(Arrears of contributions secured
over interest in land in Scotland) 
Foster Children (Scotland) Act 1984 
Section 3 
(Local authorities to 
ensure well being of and to 
visit foster children.) 
Page 107

Page 108

90 
Section 5 
(Notification by persons 
maintaining or proposing to maintain 
foster children) 
Section 6 
(Notification by persons 
ceasing to maintain foster
children) 
Section 8 
(Power to inspect 
foster premises) 
Section 9 
(Power to impose 
requirements as to the keeping of 
foster children) 
Section 10 
(Power to prohibit the 
keeping of foster children) 
Children (Scotland) Act 1995 
Section 17 
(Duty of local authority 
to child looked after by them) 
Section 20 
(Publication of information 
Page 108

Page 109

91 
about services for children) 
Section 21 
(Co-operation between 
authorities) 
Section 22 
(Promotion of welfare 
of children in need) 
Section 23 
(Children affected 
by disability) 
Section 25 
(Provision of accommodation 
for children, etc.) 
Section 26 
(Manner of provision 
of accommodation to child looked 
after by local authority) 
Section 26A 
(Provision of continuing 
care: looked after children) 
Section 27 
(Day care for 
pre-school and other children) 
Page 109

Page 110

92 
Section 29 
(After-care) 
Section 30 
(Financial assistance towards 
expenses of education or training 
and removal of power to guarantee 
indentures etc.) 
Section 31 
(Review of case of child looked 
after by local authority) 
Section 32 
(Removal of child from residential 
establishment) 
Section 36
(Welfare of certain children in 
hospitals and nursing homes etc.) 
Section 38 
(Short-term refuges for children 
at risk of harm) 
Section 76 
(Exclusion orders) 
Criminal Procedure (Scotland) Act 1995 
Section 51
Page 110

Page 111

93 
(Remand and committal of children 
and young persons) 
Section 203 
(Reports) 
Section 234B
(Drug treatment and testing order) 
Section 245A
(Restriction of liberty orders)
Community Care and Health (Scotland) Act 2002 
Section 6
(Deferred payment of accommodation costs) 
Management of Offenders etc. (Scotland) Act 2005 
Section 10 
(Arrangements for assessing and 
managing risks posed by certain offenders) 
Section 11 
(Review of arrangements) 
Adoption and Children (Scotland) Act 2007 
Section 1 
(Duty of local authority to provide 
adoption service) 
Page 111

Page 112

94 
Section 5
(Guidance) 
Section 6
(Assistance in carrying out functions 
under section 1) 
Section 9 
(Assessment of needs for adoption 
support services) 
Section 10 
(Provision of services) 
Section 11 
(Urgent provision) 
Section 12 
(Power to provide payment to person 
entitled to adoption support service) 
Section 19
(Notice under section 18: local 
authority's duties) 
Section 26 
(Looked after children: adoption 
not proceeding) 
Section 45 
(Adoption support plans)
Page 112

Page 113

95 
Section 47 
(Family member's right to require 
review of plan) 
Section 48
(Other cases where authority 
under duty to review plan) 
Section 49 
Reassessment of needs for 
adoption support services) 
Section 51
(Guidance) 
Section 71
(Adoption allowances schemes) 
Section 80
(Permanence orders) 
Section 90
(Precedence of certain other orders)
Section 99
(Duty of local authority to apply for variation or revocation) 
Section 101
(Local authority to give notice of certain matters) 
Section 105
Page 113

Page 114

96 
(Notification of proposed application for order) 
The Adult Support and Protection (Scotland) Act 2007(61) 
Section 7
(Visits ) 
Section 8
(Interviews) 
Section 9
(Medical Examinations) 
Section 10
(Examination of records etc) 
Section 16
(Moving adult at risk in pursuance of removal order) 
Children's Hearings (Scotland) Act 2011 
Section 35
(Child assessment orders) 
Section 37
(Child protection orders) 
Section 42
(Parental responsibilities and rights directions) 
(61) 2007 asp 10; section 5 and section 42 were amended by the Public Services
Reform (Scotland) Act 2010 (asp 8), schedules 14 and 17 and by the Police and Fire
Reform (Scotland) Act 2012 (asp 8), schedule 7.  Section 43 was amended by the
Public Services Reform (Scotland) Act 2010 (asp 8), schedule 14.
Page 114

Page 115

97 
Section 44
(Obligations of local authority) 
Section 48
(Application for variation or termination) 
Section 49
(Notice of application for variation or 
termination) 
Section 60
(Local authority's duty to provide 
information to Principal Reporter) 
Section 131
(Duty of implementation authority 
to require review) 
Section 144
(Implementation of compulsory 
supervision order: general duties 
of implementation authority) 
Section 145
(Duty where order requires 
child to reside in certain place) 
Section 166
(Review of requirement imposed 
on local authority) 
Page 115

Page 116

98 
Section 167
(Appeals to sheriff principal: 
section 166) 
Section 180
(Sharing of information: panel
members) 
Section 183
(Mutual assistance) 
Section 184
(Enforcement of obligations on 
health board under section 183) 
Social Care (Self-directed Support) (Scotland) Act 2013 
Section 8
(Choice of options: children 
and family members) 
Section 10
(Provision of information: 
children under 16) 
Carers (Scotland) Act 2016 
Section 6
(Duty to prepare adult carer support plan) 
Section 21
(Duty to set local eligibility criteria)
Page 116

Page 117

99 
Section 24
(Duty to provide support) 
Section 25
(Provision of support to carers: breaks from caring) 
Section 31
(Duty to prepare local carer strategy) 
Section 34
(Information and advice service for carers) 
Section 35
(Short breaks services statements)  
Page 117

Page 118

100 
Part 3 
Services currently provided by the Local Authority which are to be integrated 
The functions listed in Part 1 of this Annex 2 are delegated only to the extent that
a) the function is exercisable in relation to persons of at least 18 years of age; and
b) the function is exercisable in relation to the following services: 
• Social work services for adults and older people
• Services and support for adults with physical disabilities and learning disabilities
• Mental health services
• Drug and alcohol services
• Adult protection and domestic abuse
• Carers support services
• Community care assessment teams
• Support services
• Care home services
• Adult placement services
• Health improvement services
• Aspects of housing support, including aids and adaptions
• Day services
• Local area co-ordination
• Respite provision
• Occupational therapy services
• Re-ablement services, equipment and telecare  
Page 118

Page 119

101 
Part 4 
Services currently provided by the Local Authority which are to be integrated 
The functions listed in Part 2 of this Annex 2 are delegated only to the extent that 
the function is exercisable in relation to the following services: 
• Social care services provided to children and families
• Fostering and adoption services
• Child protection
• Criminal justice services. 
Page 119

Page 120

102 
Annex 3 
Hosted Services 
NHS Grampian has noted the services that are currently hosted across the areas of the
Grampian IJBs and offer this for consideration to the IJB as they take forward strategic
planning: 
Service Current Host
Woodend Assessment of the Elderly (including Links Unit at City
Hospital)
Aberdeen City
Woodend Rehabilitation Services (including Stroke Rehab, Neuro
Rehab, Horizons, Craig Court and MARS)
Aberdeen City
Marie Curie Nursing Aberdeenshire
Heart Failure Service Aberdeenshire
Continence Service Aberdeenshire
Diabetes MCN (including Retinal Screening) Aberdeenshire
Chronic Oedema Service Aberdeenshire
HMP Grampian Aberdeenshire
Police Forensic Examiners Aberdeenshire 
Page 120

Page 121

103 
Annex 4 
This Annex lists the services provided within hospitals which the IJB will have strategic
planning responsibilities for which will continue to be operationally managed by NHS
Grampian: 
Services:
• Accident & Emergency Services provided in a hospital; 
• Inpatient hospital services relating to: general medicine, geriatric medicine,
rehabilitation medicine, respiratory medicine and psychiatry of learning disability;
and
• Palliative Care services provided in a hospital. 
In so far as they are provided within the following hospitals: 
• Hospitals at the Foresterhill Site, Aberdeen (which includes Aberdeen Royal
Infirmary, Royal Aberdeen Childrens Hospital and Aberdeen Maternity Hospital)
• Hospitals in Elgin (which includes Dr Gray’s Hospital) 
Page 121

Page 122

Page 122

Page 123

Report to: Moray Council Meeting Date:  30 September 2026  
Report by: Executive Director Finance, Strategy and Transformation    
Author: Louise Marshall Contact Email: performance@moray.gov.uk 
Subject: Corporate Plan – Progress Update 2025-26 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to scrutinise and note progress made during 2025-26 on the
Corporate Plan 2024-29.  
1.2  This report is submitted to Council in terms of Section III (A) (4) of the Council’s Scheme of
Administration relating to monitoring performance in accordance with the Council’s
performance management framework. 
2.  SUMMARY  
2.1  This report brings together reporting on all Corporate Plan actions during the reporting
period across 3 levels:
• A high-level overview of progress against actions and key performance indicators with
key highlights (para 5.2 below refers)
• More detailed analysis in Appendix 1, identifying key performance indicators for each
Corporate Plan priority with a RAG table and chart providing a snapshot of progress
against underlying actions and performance indicators.  
• Backing tables provide the line-by-line detail for all are included as links in background
papers
- Actions – what we said we were going to do 
- Performance Indicators – the evidence of change 
3.  RECOMMENDATIONS – 
3.1  It is recommended that Council scrutinise and note progress made during 2025-26 on
the Corporate Plan 2024-29.   
Author Name Louise Marshall
Job Title  Strategy and Performance Manager 
Item 7.
Page 123

Page 124

4.  BACKGROUND AND CONTEXT  
4.1  The Corporate Plan is an important document that is intended to provide clarity and
direction on the Council’s priorities, values and plans.  Its publication assists in
communicating these to the public, the workforce and partners.  
4.2  The plan provides the context for implementation, the constraints within which the
Council must operate, the challenges and pressures and the organisational change
required to successfully deliver the priorities.  It provides a link between the national
priorities, the Moray Community Planning Partnership’s plan and the Council’s own plans
and priorities so that these can be cascaded into actions and delivery within service plans.  
4.3  While the Corporate Plan provides focus, it is not intended to encompass every Council
service that contributes directly or indirectly to the priorities or indeed those aspects of
services which are less of a priority. 
4.4  The Corporate Plan 2024-2029 and Delivery Framework were approved by the Council on
28 February 2024 (para 5 of the Minute refers) and 27 August 2025 (para 9 of the Minute
refers).  The Plan sets out Council’s priorities and vision over the 5-year period and how the
Council plans to progress these priorities, including the financial strategy aimed at
progressing towards financial sustainability. 
• Tackle poverty and inequality
• Build stronger greener vibrant economy
• Build thriving, resilient, empowered communities 
The Delivery Framework sets out more detailed actions which will be taken to achieve
these priorities.  Actions are refreshed annually as part of the Service Planning process
and updated Delivery Frameworks will be submitted to Committee in due course.  Any
work outstanding in the delivery framework covering the period to March 2026 will be
either incorporated within refreshed service plan actions or completed at a departmental
level. 
4.5  Progress against actions incorporated within Service Plans is monitored and reported
through service committees as described in the Council’s Performance Management
Framework. 
4.6  The Sustainable Development Statement was approved by the Corporate Committee on
5 November 2024 (para 16 of the Minute refers).  The Statement draws out the way in
which sustainable development is embedded in the Corporate Plan 2024-29 and wider
corporate policies, strategies and plans with progress being reported through several
updates and reports, one of which is quarter 4 performance reporting in which Service
Plan actions and indicators that underpin the delivery of Sustainable Development Goals
were highlighted in backing table documents.  An overview of progress is incorporated in
this report (para 5.4 refers). 
5.  PROPOSALS 
5.1  High Level Overview of Actions and Performance Indicators: 
Page 124

Page 125

All actions have equal weighting and are subject to update and refresh annually following
review of Service Plans therefore activity contributing to Corporate Plan priorities will
evolve and expand annually.   
The Corporate Plan is making steady progress overall against the 41 actions relating to this
and future years, with 68% progress relating to planned work across the full plan period to
2029.  Ahead of due dates, work around the Council’s digital approach and strengthening
capital monitoring is well progressed. 
Focussing on the year to March 2026, 25 actions were due to complete; 11 actions were
completed, 7 actions were well progressed (over 75% complete) and 7 actions are
continuing beyond their original due dates which translates to 80% progress against in-
year planned work or a contribution of 49% towards the overall plan period to 2029. 
Highlights of achievements across all themes are reported at paragraph 5.2.  There were
areas of work that progressed more slowly than planned due to workload pressures, in
particular; supporting the outcome to focus on a wellbeing economy providing
opportunities for all; activities supporting delivery of the Community Wealth Building
Strategy and Action Plan, improving access to fair work, employment and training
opportunities and increasing availability of affordable school aged childcare opportunities
continue into the next reporting year; also staffing and recruitment hindered elements of
work relating to Workforce Strategy in which a new due dates of December 2026 was
applied.  There were delays around the Scottish Government Data Maturity programme in
which an interest of being an early adopter had been registered. 
Overall, there were 72 corporate plan performance indicators, 2025-26 data is provided
where available, however for most indicator data relates to 2024-25.   
Forty-one indicators have targets, of those 21 indicators achieved or were within tolerance
levels of target and 20 indicators did not meet expected levels of performance, monitoring
will continue through the cycle of performance reporting to committee as set out in the
Council’s Performance Management Framework.   
In terms of short-term trend, based on the previous results, 53% of indicators show an
improving trend and 19% a worsening trend, results remain unchanged for 7% and data is
not available for the final 21%. 
5.2  Highlights of Achievements: summarised from action updates and related reports to
service committees through the reporting year. 
Tackle Poverty and Inequality
• Infant feeding in a crisis pathway embedded with additional access supported to
wider crisis funds; 569 families awarded £186k in crisis grants, in addition 229
community grants were provided.
• Practical support increased through school holiday payments, breakfast clubs,
concessionary travel, free period products and free activities.
• Progress for Parents project delivered by Moray Pathway partners recognised with a
prestigious Scotland’s Learning Partnership Award is now expanding to new
communities in Forres and Lossiemouth.  The project, which has seen a surge in
referrals in the reporting period, supports parents to overcome personal challenges,
Page 125

Page 126

reduce social isolation and take positive steps towards volunteering, learning and
employment.  There were 130 new referrals in the year 2025/26 adding to the 62
parents carried forward from the previous year with just over 100 participants moving
onto employment, volunteering, education and training.
• Funding of £102k secured following a joint Moray Health and Social Care Partnership /
Council bid from the national Child Poverty Practice Accelerator Fund.  A two-year
programme will be delivered across early years, employability and community health
services to provide critical financial maximisation advice and support.
• Intervention Fund for schools of £560k in place targeting identified areas for
improvement with a view to raising attainment.  Moray’s National Improvement
Framework (NIF) Plan 2025-26, approved in September 2025, outlined the key
progress made in improving poverty-related attainment, highlighting improvements in
reading, writing and maths skills, as well as efforts to close the education gap
between disadvantaged and other pupils with seven of nine key areas showing
progress in reducing the gap.
• Local Housing Strategy 2025-2030 approved in March 2026, focus is on increasing
housing supply, improving condition and energy efficiency of homes, preventing
homelessness and ensuring housing supports health and wellbeing.
• Improvements to local infrastructure designed to uplift communities from rural and
urban isolation realised multi-million-pound community empowerment capital
funding. 
Build Stronger Greener Vibrant Economy
• Interim target achieved in seven of eight Moray Growth Deal projects in delivery; Bus
Revolution, Digital Health, Housing Mix and Manufacturing and Innovation Centre for
Moray (MICM), Business Enterprise Hub, Cultural Quarter and Early Years STEM. 
Project updates available on Moray Growth Deal quarterly update newsletters.
- Bus Revolution Stage 2 complete, the Speyside weekend service fully operational,
AI simulation work and final report and summary presented to the Project Board
that will inform operational decisions and strategic planning. Preparing to move to
Stage 3 delivery of strengthened internal systems, refining the m.connect network
and further use of mobile data and AI to support evidence led planning.
- The first of three early years STEM Starts Discovery Centre officially launched,
giving children aged 3-8 years hands on experiences in science, technology,
engineering and mathematics.
- Housing Mix Delivery saw the completion of 39 affordable home at Speyview,
Aberlour with first tenants moved in.
• Moray’s UK Shared Prosperity Fund (UKSPF) programme delivered strong overall
performance during 2025/26, investing £1.224 million (86%) of the £1.415 million
allocation to support communities, businesses, and individuals across Moray.  
- Revenue-funded activity performed particularly well, achieving 91% spend and
delivering strong engagement and outcomes across employability, skills, business
support, and community initiatives, with many indicators exceeding original
forecasts.
- People and Skills achieved full financial delivery, while Supporting Local Business
and Communities and Place delivered significant benefits through enterprise
support, apprenticeship development, digital inclusion, volunteering, heritage
projects, and town centre regeneration.  Although some capital projects
experienced delays due to procurement, legal and delivery constraints, capital
expenditure reached £301,478 (75%), with key regeneration activity continuing into
Page 126

Page 127

2026/27 due to the 6-month extension of the programme from 31 March to 30
September 2026.  The extension allowed any underspend to be reallocated in order
to maximise spend and projects are on track to fully utilise the budget.
• The Moray Pathways Workforce North Event took place in December 2025 with 100
attendees and 50 local employers from the energy sector present, culminating in a
Skills Road map for Moray.  The Local Employability Partnership have applied for
onshore skills funding to invest in the Sector Based Work Academy Programme
(SWAP) in delivering a joined-up Skills Planning approach.  
• Six School Aged Children (SAC) provision streams are in development.  Funding to
progress utilising transport to support childcare, originally focusing on Duffus and the
Speyside area.  Promoting careers within the childcare sector continues in offering a
two-week taster course ‘Step into Childcare’ with twelve individuals participating in
the UHI Moray programme in 2025. 
Build Thriving, Resilient, Empowered Communities
• As part of the Levelling Up Fund projects, groundworks well progressed in the multi-
million-pound Elgin City Centre Masterplan South Street regeneration project, which
will bring 38 affordable homes and business enterprise space to the centre of Elgin. 
Transformation plans for Cooper Park progressing to create accessible walkways,
biodiversity planting and improved leisure areas and early design work on the
redevelopment of the former Gordon Arms Hotel to provide a creative arts centre and
pop-up retail and office space. 
• More communities and individuals are more involved in local decision making in the
delivery of local services, particularly in the locality planning communities of Buckie
and New Elgin.  In Buckie, the key projects remain as The Hub, community lunches
and Buckie Area Forum and Findochty and Buckie Development Trust.  In New Elgin,
The Link continues to strengthen community support activities that include a food
larder, weekly family fun group activities, mid-term craft and STEM activity sessions,
daily support and drop-in groups.  Nineteen Leisure and Library User Groups have
been set up across Moray with users contributing to service improvements and
development.
• In the transformation of Libraries, Learning Centres and Heritage Service, user groups
and terms of reference were established in all 11 library branches, supported by Local
Members that contributed to revised service delivery.
• Extensive consultation and engagements undertaken on the future of the learning
estate, with Phase 1 completed as planned and information shared, significantly to
inform the new site of Forres Academy.
• Moray Engage; the new digital engagement platform was launched and used
extensively to inform delivery of council services.
• The Affordable Housing Investment Programme was agreed, outlining progress and
future plans to deliver affordable homes through partnerships with Housing
Associations, alongside the Council’s own new build and acquisition initiatives across
Moray, with 228 new affordable home either under construction or scheduled to start
by March 2026 including key developments in Lossiemouth, Aberlour and Elgin South. 
Delivery Framework
• Capital monitoring has been strengthened.  As at March 2026, capital expenditure
was £32,9m against a capital plan for 2025/26 of £50.5m.
• Corporate Workforce and Organisational Development Strategy and action plan 2025-
26 was refreshed to ensure alignment of leadership and management development
Page 127

Page 128

with the leadership skills, behaviours and competencies that were agreed as part of
the corporate management restructure, setting out how the Council will prepare and
manage the workforce to be able to respond to Council priorities. 
• An ambitious three-year digital strategy, defining plans to modernise systems,
improve services and build the skills needed to create a digitally connected
community was approved.
• Transformation Strategy entered Stage 3, focused on three key themes; Citizen and
Community Focused, Sustainable Places, Smarter Internal Systems with a mix of
ongoing and new projects from energy -saving initiatives to improvements in customer
service systems and the way buildings, depots and technology are used. 
5.3 . Sustainable Development: embedded in our priorities are selected key actions and
indicators which the Council has prioritised to demonstrate the impact of sustainable
development in relation to social, economic and environmental issues. 
Social
There are three areas contributing to this theme, with most of the work being delivered via
the Children’s Service Plan; emergency infant formula pathway is embedded, and families
are supported and guided to wider crisis funds with increased awards and approval rates. 
Work continues to identify families that are financially struggling.  Sustained access to
subsidised and free supports and activities addressing reasons for low income are
provided in part from funding sources; in the reporting period there have been increases in
school holiday payments, education maintenance allowance, breakfast clubs and
concessionary travel uptake as well as improved access to free sport-based activities.
Promotion of Moray Pathways local employability partnership support and provision for
parents progressed through the Parents Project where positive outcomes were achieved in
parents moving onto employment, self-employment, volunteering, education and
training.  All planned work on early intervention addressing whole family well-being was
completed with work in schools to address poverty and wider related attainment gaps
continuing.  Focus around getting it right for every child included Moray Quality
Improvement Framework (MQIF) visits to secondary schools with findings shared and
sustained monitoring of Stretch Aims.  As yet, improvement in performance indicators
results is not evident in the 2024/25 data published; following a change in data source in
the proportion of children living in property (after housing costs) from End Child Poverty
data that relates to 16-19 year olds to DWPs Housing Below Average Income (HBAI) that
relates to the under 16 age group, results are not comparable with previous years and
figures are lower, there was a slight increase to 15.1%.  The proportion of pupils entering
positive destinations increased slightly to 93.5%, both indicators falling short of family
and national averages. 
Economics
Interim target of 7 of 8 projects in delivery achieved as planned, for the eighth project a
strategic outline case has been developed; governance approvals will be sought to bring
the project into the Moray Growth Deal and an outline business case developed in
2026/27.  Phase 2 of the Bus Revolution project is complete, the Speyside weekend
service is fully operational with an extended timetable, improving accessibility and
connectivity.  AI simulation has proved to be a valuable analytical tool to inform
operational decisions and strategic planning across the programme.  Bus Revolution
Phase 3 is being progressed by the project team to include commissioning market
research, initiating procurement for a 33-seat EV bus, expanding the charging network
Page 128

Page 129

through new charge unit installations.  Launch and promotion of the Community Wealth
Building (CWB) Portal has resulted in registration of 22 community groups and 10
businesses.  A draft roadmap to deliver a joined-up Skills Planning approach with
measurable outputs neared completion and has since culminated in a Skills Road Map. 
Six School Aged Childcare (SAC) provision streams are in development and a policy to
make use of school buildings drafted and funding secured to utilise transport to support
childcare.  Latest data for 2024/25 reported that 16.2% of people earned less than the
living wage, above family and national averages and based on indicative provisional data
median gross weekly earning by place of work and residence was £658.80.  Annual Survey
of Hours and Earnings provisional results report the gender pay gap has narrowed. 
Environmental
Delivery of the Levelling Up Fund elements of the Elgin City Centre Masterplan progressed
with the transfer of title of the new Creative Arts Centre in the former Gordon Arms Hotel
to the Council in March.  Design work for surface water management scheme at the
Sawmill and Auction Mart site progressing.  Recruitment process underway to appoint a
Development Officer to support the development of the next phase of the Cultural
Quarter work on Grant Lodge following successful funding application from Architecture
Heritage Fund.  Significant work around potential allotment sites in Buckie and
Lossiemouth.  Forres Allotments Group now with a licence to occupy their site; demand
exceeds availability with 92 requests on the waiting lists.  Tackling the affordability and
standard of the learning estate progressed with approval of future Forres Academy
contract in May, following significant consultation and engagement and contractor
negotiations.  Schools BB upgrade programme achieved planned objectives for Cullen,
Rothes, Mortlach, Alves Primary Schools.  Benchmarking results for 2024/25 show CO2
emissions area wide per capita increased slightly to 3.95, below national and family
averages and those within scope of local authority per capita reduced slightly to 6.40,
remaining significantly above national and family averages.  Results for CO2 emissions
from Transport, Electricity and Natural Gas per 1000 population report increased results
of 40.92, 32.92 and reduction to 41.72 tonnes respectively; above national and family
average from Transport but below comparators from electricity and natural gas. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) √ 
Policy and Legal √ 
Financial √ 
Risk √ 
Staffing  √
Best Value and Transformation √ 
Property √ 
Information Communications Technology/Digital  √
Equalities. Social Inclusion and Economic Impact  √ 
Climate Change and Biodiversity Impact √ 
Page 129

Page 130

6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
6.3  Policy and Legal 
Consideration was given to relevant policy and legislative requirements and direction in its
preparation.  The Plan sets out direction for the Council which may influence the
development of future policy and this will be reported where appropriate.  
6.4  Financial 
The Corporate Plan recognises that the council makes difficult decisions to continue to
work within budget constraints.  Setting out priorities assists in making those decisions. 
6.5  Risk 
The Corporate Plan employs robust risk management arrangements to the decision-
making process that will be used in the management and monitoring of the plan.  It is
increasingly important that there is strong political leadership, direction and resilience in
the pursuit of the corporate agenda.  
6.6  Staffing 
There are no staffing implications arising from this report.  Any realignment of resources as
the Council’s business is reviewed may lead to workforce implications in future which will
be reported when relevant.  
6.7  Best Value and Transformation 
The Accounts Commission Direction 2021 requires council’s to report a range of
information to show improving local services and local outcomes and demonstrating best
value.  
6.8  Property 
There are no property implications arising from this report.  
6.9  Information Communications/Technology/Digital 
There are no information communications, technology, digital implications arising from
this report.
Page 130

Page 131

6.10  Equalities, Social Inclusion and Economic Impact 
The Council’s ongoing commitment to equalities is reflected in the Corporate Plan.  
6.11  Climate Change and Biodiversity Impacts 
The Council’s ongoing commitment to climate change and biodiversity is reflected in the
Corporate Plan. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Corporate Leadership Team and
Heads of Service and any comments made have been incorporated into the report 
8.  BACKGROUND PAPERS  
8.1  Corporate Plan 2025-26 – Actions 
Corporate Plan 2025-26 – Performance Indicators 
Tackling Poverty and Inequality
Education National Improvement Framework Report and Plan 2025-26
Local Housing Strategy 2025-2030 
Build Stronger Greener Vibrant Economy
Moray Growth Deal Quarterly Update Newsletters 
Build Thriving, Resilient, Empowered Communities
Levelling Up Fund and Place Based Investment Fund – Private item (Council on 27 August
2025 – item 16 refers)
Levelling Up Fund – Update and Proposed Changes – Private item (Council on 25 February
2026 – item 13 refers)
Affordable Housing Investment Programme 
Page 131

Page 132

Page 132

Page 133

APPENDIX 1
Corporate Plan > 2029: Progress Update 2025-26 
Priority: Tackle Poverty and Inequality 
Key Performance Indicators Target Benchmarking
Comparator Averages
2023/24 2024/25 2025/26 Short term
trend
Proportion of children living in poverty (after housing costs) 12.2% 13.7%
Family Group
14.9% 15.1% Mar 2027 
Literacy Attainment Gap (P1,4,7 Combined) – percentage point gap between
the least deprived and most deprived pupils
23.7% 23.7%
Family Group
N/A N/A Dec 2026 
Numeracy Attainment Gap (P1,4,7 Combined) – percentage point gap
between the least deprived and most deprived pupils
20.3% 20.3%
Family Group
N/A N/A Dec 2026 
Percentage of pupils achieving expected level in Literacy (P1,4,7 Combined) 79.1% 74.2%
Family Group
70.6% 72.7% Dec 2026 
Percentage of pupils achieving expected level in Numeracy (P1,4,7
Combined)
83.4% 79.4%
Family Group
76.5% 76.9% Dec 2026 
Percentage of pupils gaining 5+ awards at Level 5 72% 66%
Family Group
62% 64% Feb 2027 
Percentage of pupils gaining 5+ awards at Level 6 44% 37%
Family Group
30% 31% Feb 2027 
Overall Average Total Tariff 938 869
Family Group
826 829 Oct 2026 
Average Total Tariff SIMD Quintile 1 666 543
Family Group
378 720 Oct 2026 
Average Total Tariff SIMD Quintile 2 835 685
Family Group
625 639 Oct 2026 
Average Total Tariff SIMD Quintile 3 968 833
Family Group
780 768 Oct 2026 
Average Total Tariff SIMD Quintile 4 1,149 991 917 902 Oct 2026 
Page 133

Page 134

Family Group
Average Total Tariff SIMD Quintile 5 1,258 1,131
Family Group
970 993 Oct 2026 
Percentage of pupils entering Positive Destinations 95.2% 95.3%
Family Group
93.8% 93.5% Feb 2027 
Desired Outcome Due Date Latest Status Update Progress
(cumulative) Status Icon Progress made ‘Go to Green’ Plan
TACKLE POVERTY AND INEQUALITY – 
Overall Progress   30-Jun-2026  91% 
Maximise household income by working with partners to ensure
financial inclusion services have maximum reach 31-Mar-2026
Infant feeding in a crisis
pathway embedded, additional
access is supported to wider
crisis funds.  Updated Cost of
the School Day guidance
shared with all schools. 
Practical supports increased
through school holiday
payments, breakfast clubs,
concessionary travel, free
period products and activities. 
Moray Pathways supported
parents into positive
destinations.
Continued work to identify
families that are financially
struggling.  Continued
support provided through QIO
for further implementation in
schools.  Work to reduce the
number of children in
temporary accommodation,
impact of homelessness on
children prioritised for
2026/27.
76% 
Early intervention addressing whole family well-being to ensure that
children can reach their full potential 31-Mar-2026
CYPIC P4 Writing extending
across further schools.  ASG
approaches to improving maths
attainment developing.
Secondary schools making use
of additional monies for
intervention posts and support
of wider study partners.
Targeted support to schools
aligned to PEF / SEF funding to
support attainment gaps. 
Continued work in schools to
address poverty and wider
related attainment gaps and
address underperformance in
key performance measure
within existing resources. 100% 
Page 134

Page 135

Getting it right for every child so that we continue to improve
attainment for all 28-Feb-2026
5 of 8 secondary schools
subject to Moray Quality
Improvement Framework visits
informing improvement
planning.  Positive HMIE
secondary school inspection
result.  CHT Networks
progressed system
improvement.
Continued monitoring of
stretch aims and core
progress measures. 
Secondary support meetings
and HT meetings on raising
attainment.
100% 
Priority: Build Stronger Greener Vibrant Economy
Key Performance Indicators Target Benchmarking
Comparator Averages
2023/24 2024/25 2025/26 Short
term trend
Proportion of 16-29 year olds within Moray Data only 17.1%
Scotland
14.6% 14.7% Aug 2026 
Moray median weekly earnings – for full-time employee jobs by place
of work (ONS – ASHE based on revised data but provisional 2025 data
for 2025/26 – aligned with SLAED indicator)
Data only £773.80
Scotland
£667.10 £698.70 £658.80 
1 8 9 8 4
0 5 10 15 20 25 30
Tackle Poverty and Inequality PIs
Achieving Target Within Target Outwith Target Data Only Data not available at this stage
Page 135

Page 136

Moray median weekly earnings – for full-time employee jobs by place
of residence (ONS – ASHE based on revised data but provisional 2025
data for 2025/26 – aligned with SLAED indicator)
Data only £740.01
Scotland
£647.50 £639.80 £658.80 
Proportion of people earning less than the living wage 11.4% 9.4%
Family Group
14.4% 16.2% Oct 2026 
Gender Pay Gap – Moray ALL employee jobs being place of work (ONS
– ASHE based on revised data but provisional 2025 data for 2025/26 -
aligned with SLAED indicator)
Data only 9.4%
Scotland
12.5% 16.3% 9.9% 
Desired Outcome Due Date Latest Status Update Progress
(cumulative) Status Icon Progress made ‘Go to Green’ Plan
BUILD STRONGER GREENER VIBRANT ECONOMY - Overall Progress   31-Mar-2028  56% 
Progress Moray Growth Deal: bring the remaining Moray Growth Deal
projects into delivery 31-Mar-2028
7 of 8 projects in delivery.  Bus
Revolution Phase 2 complete;
expanded Speyside service in
place.  AI simulation works
complete.  Project planning for
Phase 3 underway
Approval for 8th project SOC,
governance approvals to bring
this into the Deal and OBC
developed.  Operations team
monitoring benefits from Bus
Revolution Phase 2.  Benefit
monitoring of Bus Revolution
ongoing.
67% 
Delivery of the Community Wealth Building Strategy and Action Plan 31-Mar-2026
Promotion and support of CWB
Portal continued with business
and community registration. 
Update on socio-economic
benefits from energy agreed by
Council in February.  Centre for
Local Economic Strategies
(CLES) commissioned to
research procurement
processes and spend data.
The project funds from the
Transformation Budget in the
process of being allocated to
an external consultant to
further develop the project. 35% 
Improve access to fair work, employment and training opportunities 31-Mar-2026
Moray Pathways North event in
December 2025 attracted 100
attendees and 50 local energy
sector employers.  Draft
Sector Based Work Academy
(SWAP) developed. 50% 
Page 136

Page 137

roadmap around workforce
north nearing completion
Enable more people to work by supporting access to affordable
childcare 31-Mar-2026
Increase in Parents in Poverty
referrals.  Development of six
School Aged Children provision
streams, closure of another
prevented.  Use of School
Buildings for SAC policy
drafted, and funding secured to
progress utilising transport for
Childcare.  Schools benefitting
from after school activities run
by Elgin City Football Club
having secured SFA Extra Time
Funding.  Taster course (Step
into Childcare’ delivered.
Expansion of SFA Extra Time
school activities into 12
schools.
50% 
Priority: Build Thriving Resilient Empowered Communities 
Key Performance Indicators Target Benchmarking Comparator
Averages
2023/24 2024/25 2025/26 Short
term trend
Town Vacancy Rates 9.0% 13.1% 14.1% 14.0% Oct 2026 
4 2 3 6 2
0 2 4 6 8 10 12 14 16 18
Build Stronger, Greener Vibrant Economy PIs
Achieving Target Within Target Outwith Target Data Only Data not available at this stage
Page 137

Page 138

Family Group
Number of new Community Action Plans in place 3 N/A 3 3 3 
Participatory Budgeting activity – 1% target of Council budget 100% N/A 23.12% 13.78% 38.52% 
Number of affordable housing completions at end of current financial
year
Data only N/A 97 110 91 
Percentage of schools that are rated B or better for condition 50.9% N/A 41% 41% 46% 
Percentage of schools that are rated B or better for suitability 100% N/A 100% 100% 100% 
CO2 emissions area wide per capita (in tonnes) 3.52t 5.05t
Family Group
3.88t 3.95t Jul 2027 
CO2 emissions within scope of LA per capita (in tonnes) 3.41t 4.72t
Family Group
6.46t 6.40t Jul 2027 
Desired Outcome Due Date Latest Status Update Progress
(cumulative) Status Icon Progress made ‘Go to Green’ Plan
BUILD THRIVING RESILIENT EMPOWERED COMMUNITIES - Overall
Progress   30-Dec-2030  51% 
Delivery of the Levelling Up Fund elements of the Elgin City Centre
Masterplan 31-Mar-2028
Changes to programme agreed. 
Title transfer of new Creative
Arts Centre to Council.  Design
work for surface water
management scheme at
Sawmill and Auction Mart site
progressed. 
40% 
Delivery of Town Centre Improvement Plan & Annual Report 31-Mar-2028
Focused on Local Development
Plan and accessing external
funding to deliver TCIP projects. 
Design works progressed for
Dufftown and Forres projects. 
Review of all TCIP actions
complete.  TCIP programme
Annual report presented. 
20% 
Page 138

Page 139

Take a partnership approach to locality planning in priority areas of
Moray to enable people to influence services and develop community
action
31-Mar-2026
Locality Planning in Buckie and
New Elgin ongoing.  In Buckie,
cost of living remains focus for
monitoring group and action
plan, support work around The
Hub, Area Forum and
Development Trust. Continued
growth in The Link, New Elgin
with focus on community
activities and supports. 
Consultation and engagement
support provided in respect of
Learning Estate and Libraries
and Leisure events, first phase
of Learning Estate
engagements complete and
information shared.  Funding
gained from Architecture
Heritage Fund to help support
delivery of Cultural Quarter. 
Allotment potential sites
investigated in Buckie and
Lossiemouth, lease terms
being negotiated in Forres. 
Moray Engage platform
operational.
Timescale for completion of
locality planning planned
work extended to December
2026 and around community
engagement to March 2027. 
The Link, New Elgin showing
wider aspirations around
funding for halls and
improvements to open
spaces. Recruitment of
Development Officer to
deliver next phase of Cultural
Quarter project. 
Development of Community
Engagement Strategy
ongoing.
84% 
Delivery of the Housing. Investment and Affordable Housing Supply
programmes 31-Mar-2028 Programme delivery in several
areas as planned.  40% 
Tackle the affordability and standard of our learning estate to ensure
sustainability while meeting climate requirements 31-Dec-2030
Scale down of Elgin High
School Extension build agreed
to repurpose existing building
to meet lower future capacity
requirement.  Independent
external review of school roll
forecasting completed. 
Contract award for future
Forres Academy complete. 
Engagements completed as
LEIP2 funding to be
transferred to another
qualifying school project.
58% 
Page 139

Page 140

planned.  Schools BB upgrade
programme objective met. 
Priority: Delivery Framework 
Desired Outcome Due Date Latest Status Update Progress
(cumulative) Status Icon Progress made ‘Go to Green’ Plan
STRATEGIC DELIVERY FRAMEWORK – Overall Progress 31-Jul-2027  65% 
Financial Planning 30-Jun-2026
Milestones around
strengthening capital
monitoring achieved. 
Automated monthly reporting in
place resulting in lower level of
slippage and more accurate
forecasting on spend. 
Forecasting procedures for
revenue budget in place as per
audit recommendation.  
PB spend capture work
ongoing.
79% 
Workforce Strategy 31-Dec-2026
Focus on embedding
leadership development
structured and day-to-day
Refinement of Leadership
Development Strategy and
Recruitment Strategy.  
62% 
1 0 2 6 0
0 1 2 3 4 5 6 7 8 9 10
Build Thriving, Resilient, Empowered Communities PIs
Achieving Target Within Target Outwith Target Data Only Data not available at this stage
Page 140

Page 141

practice, building on phase 1
delivery.  Employee survey in
place.  Key senior
appointments in place to
support organisational capacity
and stability.  Continued
support to services around
people management.  Ongoing
monitoring of gender pay gap
and wider equality indicators. 
Modernised conditions of
service framework progressed.
Digital Strategy 31-Mar-2027
SharePoint Online
implementation programme
progressed as planned. 
Website modernisation and
migration to Umbraco ongoing. 
Copilot for M365 options being
reviewed follow end of pilot
period.  All schools migrated to
BT SWAN2 network. Migration
to Mobile Device Management
solution complete 
61% 
Transformation Projects 31-Jul-2027 Review of Depot & Stores
ongoing.  24% 
Performance Management Framework 31-Dec-2024 PSIF programme on schedule  100% 
Page 141

Page 142

1 2 6
0 1 2 3 4 5 6 7 8 9 10
Strategic Delivery Framework
Achieving Target Within Target Outwith Target Data Only Data not available at this stage
Page 142

Page 143

Report to: Moray Council  Meeting
Date:
30 September 2026  
Report by: Executive Director Finance, Strategy and Transformation 
Author: Jamie Fraser Contact
Email:
jamie.fraser@moray.gov.uk 
Subject: Short to Medium Term Financial Strategy 2027-29 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to approve an updated Short to Medium Term
Financial Strategy, covering preparation of the Council’s General Services
Revenue budgets for 2027/28 and 2028/29 alongside an update to the budget
for 2026/27.  
1.2  This report is submitted to Council in terms of Section II (13) of the Council's
Scheme of Administration relating to the approval of Council reports and
strategies of a corporate nature. 
2.  SUMMARY  
2.1  The Short to Medium Term Financial Strategy (APPENDIX 1) sets out the
Council's approach to closing the forecast budget gap over the period 2027-
29. It builds on the Medium to Long Term Financial Strategy, the three-year
indicative revenue budget approved by Council when setting the annual
budget, and an assessment of the key risks and uncertainties that could
increase the funding gap. The Strategy also includes a high-level timetable for
the development of the 2027/28 budget, which is currently underway. 
2.2  When the Council set its annual budget for 2026/27 on 25 February 2026
(paragraph 4 of the Minute refers) it did so from a balanced position. Following
the closure of the accounting period of 2025/26, further amendments
alongside emerging costs pressures have been recommended for adjustment
Item 8.
Page 143

Page 144

to the 2026/27 budget, resulting in a total net amendment of £0.7m. The
adjusted budget position (APPENDIX 2) has been used to form the basis for
the Short to Medium Term Financial Strategy update and subsequent savings
targets.  
2.4 The Strategy notes the potential significant impact of variances from budget
assumptions and sets a tolerance level to increase the projected savings to
be identified to allow for the impact of a moderate variance from base
assumptions and on that basis sets a savings target for 2027/28 of £2.5m.  
2.5 An updated Budget on a Page tracker is provided (APPENDIX 3) and includes
issues likely to help to close or tend to widen the budget gap which will be
used as a measure of the progress of the Short to Medium Term Strategy
through the year. 
2.6 A Performance Indicator to be used as a headline measure of progress
(budget gap as percentage of net revenue budget) is also recommended,
showing a current budget gap for 2027/28 of 0.78%. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Council approve:   
i)  The approach set out in the Short to Medium Term Strategy
contained in APPENDIX 1 to this report; 
ii)  Net adjustments of £0.7m to the 2026/27 budget as set out from
paragraph 5.20 to 5.27; 
iii)  The savings target of £2.5m for 2027/28 derived within the
Strategy; 
iv)  The Performance Indicator set out in paragraph 5.29; 
v)  The high-level timetable included in the Strategy; and 
3.2 It is recommended that Council notes:   
i) The risks and uncertainties currently identified as set out in the
Strategy and listed in APPENDIX 3 to this report.   
Jamie Fraser
Chief Financial Officer 
4.  BACKGROUND AND CONTEXT  
Page 144

Page 145

4.1  The Medium to Long Term Financial Strategy for 2026 to 2036 was approved by
Council on 25 February 2026 (paragraph 6 of the Minute refers).  It indicated a
mid-case scenario of a budget shortfall of £5.0m for 2027/28 and of £9.7m for
2028/29, with an average shortfall of £6.3m each year for the 10 years covered
by the Strategy.    
4.2  The key levers identified in the Strategy for reduction of the budget shortfall
were: Council Tax, other income generation, staff establishment and asset
base.  The Council’s Transformation Strategy continues to be key in long term
financial strategy, utilising these levers to reduce expenditure as the Council
transforms its operations in response to the Council’s vision for the future. 
Planning for future service demand will also be a key feature.  
4.3  The indicative budgets noted when the budget for 2026/27 was approved by
Council on 25 February 2026 (paragraph 4 of the Minute refers) indicated
budget gaps of £2.9m in 2027/28 and £7.4m in 2028/29, with £2.0m total
approved savings resulting in a residual budget gap of £8.2m across the two-
year period.  The reduction in budget gap from that estimated in the Medum to
Long Term Financial Strategy arose from indicative increases in Council Tax
which were above the mid case used in the Medium to Long Term Financial
Strategy.  
4.4  These indicative budgets, alongside the amendments recommended for
approval in this paper, are the starting point for this Short to Medium Term
Financial Strategy, with a focus on how these budget gaps will be removed.    
4.5  The Strategy also identifies the key risks for the budget setting process which
could increase the budget gap.  The budget planning process will therefore
address the potential for greater savings being required than the indicative
budgets suggest and sets a target figure for savings to be identified as part of
the financial planning process. 
5.  PROPOSALS  
5.1  The Short to Medium Term Financial Strategy aims to hold in balance two main
sources of financial change:  the Council’s Transformation Strategy, which is
recognised as the source of long-term change, and service redesign in response to
short-term requirements.  These short-term requirements could arise from changes
in demand for service, inflation or other external cost impact or underlying
overspends identified during review of the out-turn for 2025/26.   
The position is reflected diagrammatically below: 
Page 145

Page 146

Transformation
5.2  The Council’s Transformation Strategy is regularly reported on and potential savings
identified as progress on individual projects enables this to be done.  Current areas
where savings are estimated to be within the scope of this strategy are: 
• Future Workforce Programme
• Depot and Stores Rationalisation
• LED lighting and solar power
• Improving Attendance   
5.3  Savings are projected to arise from reduction in the Council’s asset base from
Smarter Working and the Depot and Stores Rationalisation. Reduction in energy
costs are projected from the LED lighting and solar power projects.  Current
estimates of savings are included in the indicative budget from 2026/27, however
there may be further savings from these projects during the period 2027/28 to
2028/29. 
5.4  Further savings are included from the inclusion of the Improving Attendance project,
approved by Council on 3 December 2025 (paragraph 17 of the minute refers),
which aims to reduce sickness and associated costs by introducing targeted
support within schools and are including in the indicative budget from 2026/27. 
Income
5.5  Council Tax is the main lever within the budget for generating income. A 10%
increase was approved for the 2026/27 budget, with an indicative increase of 6% for
2027/28. The higher increase in Council Tax for 26/27 generated additional income
of £5.8m, with indicative income of a further £3.8m in 2027/28. There is currently no
Budget
2027/28
Transformation
Strategy
Medium to Long
Term Financial
Strategy
(rebased for
indicative budget)
Variance Report
Page 146

Page 147

indicative increase included for 2028/29, creating an opportunity to utilise this lever
in future periods. 
5.6  On 1 April 2026 the Council Tax (Variation for Unoccupied Dwellings) (Scotland)
Amendment Regulations 2026 became law.  These introduced a national default of
100% for the Additional Council Tax Charge and the Second Home Premium, but
also permitted each Council to set its own rate at above or below the stated national
default. Following approval of another report to this committee, options to alter
these charges will be explored. Whilst any increase  should not be seen as a
continued financial benefit, a period of increased income in the short-to-medium
term may materialise. 
5.7  If innovative income generating proposals are developed these will be considered as
a high priority, in accordance with the savings hierarchy. Proposals are currently in
their infancy, which look to compliment statutory functions by creating additional
value-adding services for the public. Whilst currently not a significant part of closing
the budget gap, recognition is noted as part of this Strategy and embedded within
baseline. 
Savings / service reduction
Budget-led approach
5.8  As shown in paragraph 5.1 it is proposed that the main reference point for savings
will be given by variances from finalised outturn position of 2025/26 in the first
instance.  Thereafter any further variances from budget will be included as these
emerge during the budget monitoring process. 
5.9  This approach is consistent with a policy led approach to budgeting.  Budgets
approved by Council should be adhered to in order that the Council’s expressed
level of expenditure is adhered to.  Budget managers should develop proposals to
vary service delivery to ensure that expenditure remains within budget if it appears
likely that budget will be exceeded.  
5.10  When the out-turn for the year is reported the budget variances for the year are also
reported, setting out variance from budget and reasons why, also variances from
those projected during the year. 
5.11 Where one-off expenditure has been incurred such that budget is exceeded, budget
managers will be asked to confirm the one-off nature of the spend (or loss of
income).  
5.12 Where expenditure is potentially recurring, budget managers will be asked to
develop plans for service reduction to bring expenditure into line with budget.  This
could be from reduction in services standards, reduction in volume of service or
from alternative methods of service delivery. 
Page 147

Page 148

5.13 Heads of Service will monitor progress against these plans on a quarterly basis. 
This will form part of revenue budget monitoring report to Corporate Committee and
to service committees.  This represents a firming up response to potential
overspends.  It coheres with the Council’s Financial Regulations but takes a firmer
stance operationally on overspends than has previously been the case. 
Demand-led approach
5.14 Heads of Service will also be asked to identify opportunities for savings arising from
projected reduction in demand for services e.g. from demographic changes.  This
has been recognised as a feature of the Medium to Long Term Financial Strategy but
needs to be given more prominence in the Short to Medium Term Financial Strategy. 
5.15
Best Value approach
Services will be asked to review the cost of delivering services in-house compared
to outsourcing services.  In the first instance this will be focused on areas of budget
pressure identified in the review of year end variances. 
5.16 There is the annual savings request to all Heads of Service. It is included for
completeness and in recognition that savings above the level being planned for may
have to be identified. 
Partnership approach
5.17 The final strand of the Short to Medium Term Financial Strategy is the Partnership
Approach. Building on the successful co-development of the Moray Integration Joint
Board (MIJB) Recovery Plan and the delivery of significant savings, partnership
working remains an important element of the Council’s financial strategy. Whilst
MIJB services continue to operate within a challenging financial environment,
ongoing collaboration between the Council, NHS Grampian and the MIJB will be
critical to delivering sustainable services, managing financial risk and protecting the
financial position of all partner organisations. 
5.18 The Partnership Approach recognises the growing emphasis within public sector
reform on service transformation, prevention, collaboration and place-based
delivery. As expectations on public services continue to increase against a backdrop
of constrained resources, the Council will seek opportunities to work with others to
redesign services, reduce duplication, improve outcomes and maximise the impact
of public expenditure. Developing and strengthening collaborative approaches will
be an important element of addressing future financial challenges and supporting
the long-term sustainability of Council services. 
5.19 Other areas where the Council works with – mainly third sector – providers have
been subject to financial scrutiny as part of budget preparation, particularly in
recent years.   Where there has not been recent financial scrutiny, partners should
be asked if they can identify savings to contribute towards the Council’s residual
budget gap. 
Budget update 2026/27
Page 148

Page 149

5.20 When Council sets its 2026/27 budget on 25 February 2026, it did so from a
balanced position. A revised budget position can be seen in APPENDIX 4, with
notable variances recommended for approval. 
5.21 Adjustments to figures brought forward, following the closure of the 2025/26
financial period total a net increase of £70,000 to the opening position of the
2026/27 budget. The movement was as a result of phasing of earmarked reserves. 
5.22 The corporate insurance contract was re-tendered in Q1 2026/27. Following
completion of the procurement exercise a saving of £342,000 has been recognised.
The saving is made up of two components; a reduction in the premium (£157,000)
and a reduction in the provision set aside for inflationary increases based on prior
years premium (£185,000). 
5.23 An underspend in the Capital Plan from 2025/26 creates a reduction in expected
loans recharges for 2026/27. Accounting for the underspend, offset by potential
interest rate risk, a reduction in loans charges of £250,000 is recommended to be
reflected in the budget figure. 
5.24 Redistributions of Scottish Government Revenue Grant of £213,000 have been
received and is recognised in the baseline funding. A further £9,000 is also included
in relation to additional income from Scottish Water. 
5.25 Total emerging pressures of £851,000 are noted for inclusion. Pay pressures as the
result of a role re-grading as reported in Q4 2025/26 have resulted in a recurring
budget pressure of £621,000. Additional one-off pressures include £60,000 for
further public land inquiry fees and associated costs and £178,000 related to the
National Records for Scotland Project. A minor saving of £19,000 is also recognised
as part of works available for capitalisation under the PPP/PFI service concession
contact. 
5.26 A budget correction of £638,000 is noted for inclusion. A double counting of income
for Additional Support for Learning has created a single year budget pressure of
£485,000. Funding was provided over two years (2025/26 and 2026/27); as the
project did not go live until 2026/27, the first-year funding was incorrectly applied to
general expenditure in 2025/26. The budget for the Moray Growth Deal STEM project
was increased by £153,000 to reflect a change request in the programme. This
represents the Council’s contribution to the project and reflects a timing of the
programme delivery rather than an additional budget pressure. 
5.27 The net impact of additional savings against emerging budget pressures has
resulted in further savings target of £726,000 for 2026/27. An updated Budget
Overview recognising these adjustments and subsequently informing the Short to
Medium Term Financial Plan, is included in APPENDIX 2. 
Savings target
Page 149

Page 150

5.28 The Strategy contains a sensitivity analysis of the impact of variances of key budget
assumptions from which a working target for savings is developed – this is higher
than the revised indicative budget figure of £0.2m in 2027/28 as the timescale
during which some of these assumptions will crystallise are too short to enable an
agile response to changes in assumptions as they materialise. 
5.29 It is proposed that the working savings target for 2027/28 is set at £2.5m, based on a
0.5% reduction in Scottish Government grant; 0.5% increase in the cost of pay
awards and inflation; and 0.5% increase in the cost of borrowing as these are
considered the highest risk variables.  It also includes the most recent budget gap
for 2027/28. The Performance Indicator to measure progress in meeting the savings
target therefore starts at 0.78% (£2.5 million as a percentage of £321.9 million). 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the
recommendations are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  X
Financial X 
Risk X 
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital          X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP))
Improved Collaborative Leadership, as part of continuous improvement
through Best Value, will better enable the Council to fulfil the ambitions set
out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the
following Council Plan strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
Page 150

Page 151

b) Links to Local Outcomes Improvement Plan – The proposals in this report
support and contribute to improved outcomes for communities as
outlined in the following local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in  
Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
6.3  Policy and Legal 
There are no policy and legal implications arising directly from this report. 
6.4  Financial 
The report sets out the approach taken to close the budget gap for 2027/28 
updated to reflect the most recent position following approved amendments
and to address the potential additional savings requirements which arise if
various risks crystallise. 
6.5  Risk 
There are significant areas of risk to the financial planning process arising from
major uncertainties and these are itemised in the attached Strategy.  
6.6  Staffing 
No staffing implications arise directly from this report. 
6.7  Best Value and Transformation 
There are no implications arising directly from this report.  The report assumes
that the Transformation Strategy is a key document for financial planning
purposes.  
6.8  Property 
No property implications arise directly from this report.  The report recognises
that the Council’s asset base is a key driver for expenditure and requires to be
reduced.  
6.9  Information Communications/Technology/Digital 
No information communications/technology/digital implications arise directly
from this report. The report recognises the importance of ICT as part of the
Council’s approach to modernisation.    
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities, social inclusion or economic impacts arising from this
report.  
6.11  Climate Change and Biodiversity Impacts
Page 151

Page 152

There are no direct climate change or biodiversity implications arising from this
report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with ECLT and any comments
have been included in the report. 
8.  BACKGROUND PAPERS  
8.1  Held within Accountancy section.   
Page 152

Page 153

APPENDIX 1 
SHORT TO MEDIUM TERM FINANCIAL STRATEGY 2027-29 
Background
1.1 The Short to Medium Term Financial Strategy forms part of a suite of documents
used in the Council’s financial planning:
• The three-year indicative budget reported when the budget for the year is
set and regularly updated throughout the year in financial planning reports
to Council;
• The indicative ten-year Capital Plan, underpinned by the Council’s Capital
Strategy;
• The Council’s Charging Policy, sitting within the Income Strategy;
• The Council’s Reserves Policy;
• The Council’s Treasury Management Policy;
• The Medium to Long Term Financial Strategy;
• The Transformation Strategy; and
• Sitting above all these, the Council’s Corporate Plan.
1.2 Moray Council in common with all other Scottish local authorities has been
delivering service efficiencies and making budget savings for many years.  For
most of this time reserves have been planned to be used to make up the shortfall
between the cost of services and funding for the Council.  That was not a
sustainable position and the Short to Medium Term Financial Strategy for 2024/25
to 2025/26 aimed to remove the use of reserves, described as removing the
structural or underlying budget deficit.  That aim was achieved when the budget
for 2025/26 was approved, with no planned use of reserves to fill part of the
budget shortfall. A further balanced budget in 2026/27 was achieved without the
requirement of further savings to be identified. 
1.3 It should be noted that the Council has set aside ear-marked reserves for specific
purposes, notably for Transformation of services in particular.  Use of these
reserves in accordance with the Council’s intent reflects prudent and forward-
looking financial planning.
1.4 Following removal of the structural budget deficit this Short to Medium Term
Financial Strategy focuses on the approach to eliminating forecast budget gaps
arising from the assumption that costs will increase by more than the funding
available to the Council, in particular core funding from Scottish Government.
Page 153

Page 154

2 Key Financial Levers 
2.1 The levers above have been recognised as the key financial levers in previous
Financial Strategies (both Short to Medium and Medium to Long Term).  Their
relevance continues.  These are the components in the budget which the Council
can decide or influence and the movement from each of these levers impacts on
the required movement from the others. 
2.2 In recognition of the importance of income generation the Council has adopted an
Income Strategy. The current strategy runs from the period 2024/25 to 2026/27. A
review of the strategy is planned before the 2027/28 financial year. The guiding
principles behind the strategy are: 
• To fully recover the cost of electively used services
• To generate income from Council assets
• To maximise income from charges 
3 Hierarchy of Transformation, Income and Savings
3.1 The Council has an agreed Savings hierarchy, with transformation of services as
the preferred option, followed by income generation, thereafter services reduction
or cessation.
Council Tax Other Income
generation
Staff
establishment Asset base
Page 154

Page 155

Transformation
3.2 Service transformation to deliver services has been delivered over an extended
period of time.  The current transformation projects underway or in the course of
being developed are included in the latest Transformation Strategy Update
approved 24 September 2025.  Where quantified, savings are included in financial
projections. 
3.3 The focus of Transformation for the Short to Medium Term Financial Strategy is on
savings arising from Asset Management: Smarter Working; Depot and Stores
Review; LED lighting and solar power energy efficiency.  Current estimates of
savings to be achieved in the short term by projects underway are included in the
indicative budget for 2026/27.  Scope for increasing savings through extending
work programmes will be explored as part of the Strategy. 
Spend to Save
3.4 Spend to save proposals are part of the top level of the savings hierarchy and
budget managers are encouraged to bring forward spend to save proposals as
they are identified. The Improving Attendance project, approved 3 December
2025, aims to reduce sickness and associated costs by introducing targeted
support and are including in the indicative budget from 2026/27. 
Income
3.5 The Council approved an Income Strategy for the period 2024/25 to 2026/27,
covering both Council Tax and charges currently made for services.  The Income
Strategy gives an agreed basis for planning which includes a minimum income
target.  As part of the budget setting process for 2025/26 indicative Council Tax
increases for 2026/27 and 2027/28 which were higher than the minimum level
were included, as an expression of the Council’s likely future intent. 
3.6 Review of proposed increases for Council Tax and for charges for services will form
part of the annual financial planning process, with the review being held within the
framework of the Income Strategy.
Transform /spend to save
Increased income
Reduce /
cease service
Page 155

Page 156

3.7 Following the budget driven approach, income from charges in 2025/26 will be
reviewed and where possible savings taken by increasing budgets to reflect
increased income.  It is recognised that increased income may entail increased
expenditure in some instances and a case-by-case review between service
departments and accountancy staff will be required. 
Savings
3.8 As part of the financial planning process for 2024/25 and 2025/26 a Savings
Delivery Plan was agreed, and this set three approaches to generating savings: the
thematic approach, the review-led approach and the partnership approach.
These approaches will continue.  The thematic approach has largely been
encompassed within the latest version of the Transformation Strategy and the
approach proposed for 2026/27 for Council services is to follow a budget-
monitoring driven approach, focussing on areas of divergence from budget in
2025/26 and projected areas of divergence in 2026/27 as these emerge. 
Budget-led approach
3.9 Heads of Service will be asked to develop plans for reducing net expenditure to
budget levels where the budget to date is exceeded or the budget for the year is
forecast to be exceeded.  The starting point for this process will be variances from
budget in 2025/26.  Progress against these plans will be monitored and the impact
reported on as part of quarterly budget monitoring to Corporate Committee and
to services committees. This will give heightened visibility of the relationship
between service delivery and budget is pressured areas.  This in turn enables
members to further develop a priority-led approach to budgeting. 
Demand-led approach
3.10 Heads of Service will also be asked to be alert for savings opportunities arising
from change in demand for services e.g. due to demographics, where Moray is
forecast to see a significant reduction in the number of younger people.  Medium
to long term financial planning should reflect the impact of changing
demographics but there will also be consequences which arise immediately (e.g.
for the Devolved School Management budget) and which should therefore be
incorporated into short term financial planning. 
Best Value approach
3.11 Heads of Service will be asked to consider whether the use of in-house or out-
sourced services represents Best Value.  In the first instance this will be driven by
areas of budget pressure identified as part of the Budget-led approach.  In order
Page 156

Page 157

that this is effective, the cost of in-house services must be known with confidence
in the accuracy of costing. 
Residual savings
3.12 As is customary Heads of Service will also be asked for any other scope for
savings. The starting point will be identifying the potential for recurring savings
from underspends in 2025/26. 
Partnership approach 
3.13 The partnership approach was based on co-development of a Recovery Plan for
Moray Integration Joint Board and support through the delivery of the Recovery
Plan.  The Recovery Plan has been notably successful in prior years and it is
proposed that this strand of work continues. 
3.14 It is proposed that where possible the partnership approach is extended to
encompass other delivery partners, recognising that none of the other
partnerships will be on the scale of MIJB. 
3.15 Developing Shared Services with other local authorities may be considered as
part of the partnership approach. 
4 Sensitivity Analysis 
4.1 Key budget assumptions for 2027/28 are set out in the table below.  Comparison
with the mid case in the Medium to Long Term Financial Strategy is shown, along
with the impact of the range of assumptions used in that Strategy and the impact
of a 1% variance from the indicative budget. 
4.2 This sensitivity analysis will be used to develop a working savings target range for
financial planning processes during 2026/27. 
Budget
component
Assumption + / - 1% Savings
Tolerance
Scottish
Government
Grant (inc NDR
income)
Flat cash £2.6m £1.3m
Council Tax in-
year collection
rate
96.5% £0.6m £0.3m
Page 157

Page 158

Pay award (exc
MIJB staff)
3% increase across
the board for all pay
groups
£1.3m  £0.7m 
Range   +/-  £4.5m  £2.3m 
4.3 Unsurprisingly the budget is most sensitive to movement in government grant, the
largest single component of the budget.  Unfortunately, this is inherently difficult
to predict. Similar, market conditions, including both 
4.4 As the residual budget gap is reduced, the impact of variance from budget
assumptions becomes more marked.  It is therefore important to set a tolerance
level for budget savings which is large enough to facilitate planning for scenarios
which are worse than those envisaged in the indicative budgets for 2026/27 and
2027/28. 
4.5 It is proposed that the tolerance level is based on variance in Scottish Government
grant and pay and price inflation; as these are completely out with the control of
the council, alongside an element of Council Tax in-year collections. To build in
some leeway for these key assumptions it is proposed that the target savings are
the residual budget gap 27/28 plus half of the impact of a 1% reduction in the
above mentioned variances.  This would result in a savings target for financial
planning purposed of £2.5 million. 
4.6 It should be noted that this savings target assumes a Council Tax increase of 6%
in 2027/28. 
5 Risk factors
5.1 In addition to the key budget assumptions identified above, the budget is subject
to the following risks: 
Core assumptions in 2027/28
5.2 The savings incorporated in the budget for 2026/27 may not be fully realised.   This
includes the increase in Council Tax, where a reduction in collection rate is
possible in the current economic climate. 
5.3 At the time of preparing this Strategy, no Scottish Government pay policy has been
published beyond the current 2025/26 to 2027/28 framework. Whilst Scottish
Government has indicated that a review of public sector pay policy will form part
of the 2027/28 Budget process, the outcome remains uncertain. At present a 3%
increase has been allowed for. 
Page 158

Page 159

5.4 The current economic climate is very volatile and significant increases in costs for
goods and services are feasible.  A number of significant procurement exercises
are underway.  ICT suppliers are moving towards the cloud, which means costs
must all be met from revenue.   
5.5 Moray Integration Joint Board (MIJB) is implementing its current Recovery Plan but
increased costs due to pay awards and other cost increases and to increased
demand are forecast.   MIJB is in the process of developing savings from further
efficiency and operating model changes.  There is the risk that expenditure may
not be contained.  The cost of Children’s Services, particularly out of area
placements, is increasing.  Such costs may be recurring. 
5.6 Restrictions on the Capital Plan arising from capped expenditure may reduce the
ability of services to recharge staff time to capital projects. 
5.7 Any of the above would create additional budget pressures which would roll
forward into 2026/27. 
Core assumptions 2028/29
5.8 In addition to those above: 
5.9 The indicative budget assumes no increase in the shortfall funding for MIJB which
currently stands at £4,200,000.  The MIJB plans for containing costs may not be
deliverable within the required timescales.   
5.10 Inflation remains a key risk to the Council’s financial planning assumptions.
Whilst inflation has reduced significantly from recent peaks, current forecasts
suggest it may remain above the Bank of England’s 2% target for longer than
previously anticipated, with continuing uncertainty surrounding energy prices,
global economic conditions and pay settlements. This remains particularly
relevant as a number of the Council’s major expenditure areas, including Real
Living Wage increases, PPP/PFI payments, transport contracts and insurance
premiums, are either directly linked to inflation indices or significantly influenced
by inflationary pressures 
5.11 A trend for increased costs arising at least in part from the impact of climate
change appears to be emerging, with landslips a notable example of this.  Such
events are not amenable to planning.  The Council has incorporated an element
of contingency in its capital programme but this may prove insufficient. 
Page 159

Page 160

5.12 The Scottish Government has not yet provided certainty regarding Council Tax
policy beyond 2026/27. Whilst there has been no formal announcement of a
freeze or cap on future Council Tax increases, the possibility of further national
intervention cannot be discounted. In the absence of clear policy direction, the
implications for local government funding remain uncertain. Any future restriction
on the Council's ability to increase Council Tax, unless accompanied by full
compensatory funding, would increase the budget gap and require additional
savings, income generation or use of reserves to maintain a balanced budget. 
6 The Wider Context
6.1 There are emerging issues which could potentially impact on the Council’s
financial planning process during the scope of this Strategy. 
6.2 Additional powers such as the ability to set a visitor levy may change the financial
landscape within which the Council is operating. 
6.3 Part of that landscape is significant funding from both Scottish Government and
UK Government which require expertise in framing bids and significant staff
resource to monitor compliance with grant conditions and report on progress and
spend in accordance with government directions. 
6.4 Despite reduction in specific revenue grants a sizeable proportion of Scottish
Government grant funding is subject to restrictions.  Funding directed by Scottish
Government is frequently less that the full cost of the initiative for which it is
required to be used. 
6.5 The Council is operating in an environment which is largely digital by default in its
dealing with other organisations.  This brings scope for efficiencies but also risk
from cyber attacks. 
6.6 The Council’s Learning Estate requires significant investment to bring facilities to
the Scottish Government’ recommended “B-B” standard.  School rolls are
projected to fall, which should result in reduction of expenditure, but Scottish
Government is maintaining pressure to meet targets for teacher numbers which
disregard pupil rolls.  Falling school rolls can also result in reduced General
Revenue Grant. 
6.7 The Scottish Government's Public Service Reform agenda places a growing
emphasis on reducing duplication across the public sector, increasing
collaboration between organisations, rationalising national public bodies and
expanding shared service models. As responsibilities are reviewed across the
Page 160

Page 161

wider public sector, there is potential for local authorities to assume an enhanced
role in the delivery and coordination of services previously undertaken by national
agencies or arm's-length bodies. This presents both opportunities and risks,
requiring councils to demonstrate organisational agility, strong partnership
working and a continued focus on transformation to ensure that any additional
responsibilities can be delivered sustainably and within the resources available 
6.8 The Council continues to have difficulty with staff recruitment and retention. This
creates capacity challenges in delivering significant projects 
7 Timescale for implementation
7.1 Key stages are set out below: 
July Aug Sept Oct Nov Dec Jan Feb
Efficiencies Develop Report 
Savings  Develop Report 
Charges     Develop Report 
Capital    Develop Report 
Settlement    Draft  
Budget      Report 
7.2 This Strategy will be updated and progress reported to Council on a regular basis. 
Updates will track movements in the Budget on a Page and show the balance of the
savings target for 2027/28 as a percentage of the indicative net revenue budget for
2026/27.  The Budget on a Page includes emerging issues and will be updated as they
are crystallised and as further issues emerge.  
Page 161

Page 162

Page 162

Page 163

2026/27 2027/28 2028/29
Revenue Expenditure £000s £000s £000s
Service allocations 298,167         312,548         318,795        
Adjustments to brought forward figure: 987                    1,158-               1,998              
Opening budget 299,154         311,390         320,793        
(Underspend)
Pay and price increases 7,430               7,660               7,900               
(Decrease) / Increase in Loan Charges per budget 295                    2,409               4,962              
New Burdens 85                       -                     -                    
Budget pressures:
- Approved or noted for future years when budget set 8,046               244                    -                    
Emerging 1,489               128                    156                   
Expenditure to be matched by Use of Earmarked Reserves 1,406               66                       -                    
TOTAL EXPENDITURE 317,905         321,897         333,811        
Revenue Funding
General Revenue Grant / NDRI 243,807         246,176         248,638        
LEIP funding -                     -                     1,742              
New burdens funding not included in grant above 85                       -                     -                    
UKG funding for pEPR 3,359               2,500               2,500              
Council Tax 63,590            67,802            68,234           
Funded from Ear-marked reserves:
Transformation 1,406               66                       -                    
MGD cash flow -                     379                    716                   
Working reserve
Service concession 301                    1,871               3,518              
TOTAL REVENUE 312,548         318,795         325,348        
SAVINGS REQUIRED 5,357               3,102               8,462              
Savings Summary
Savings Approved:
Approved when budget set 3,901               2,657               1,148              
Temporary savings including financial flexibility 117                    50                       -                    
Further savings approved -                     -                     -                    
Indicative Savings from Transformation Programme 447                    149                    -                    
Other savings proposed 166                    -                     -                    
Savings to be identified 726                    246                    7,314              
TOTAL SAVINGS 5,357               3,102               8,462              
APPENDIX 2
BUDGET OVERVIEW at 1 September 2026
Page 163

Page 164

Page 164

Page 165

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2026/27 2027/28 2028/29 Notes
£000s £000s £000s
Expenditure 313,274   321,897   333,811  
Income 312,548   318,795   325,348  
Shortfall 726             3,102         8,462         Revised budget gap
Savings Approved 2,856         1,148        
Balance 246            
Adjust for tolerance 2,300         Risk Allowance
Savings Target for 2026/27 2,546        
Potential to meet savings target
Council Tax - 2nd Home Premium Additional powers
Council Tax - Empty Property Additional Charge Additional powers
Council Tax - Increase base charge Income lever 28/29
Income - Other Charges
Pension Tri-annualisation
Review of Workfoce
Social Care Demands MIJB Recovery Plan
Increase SG Grant Funding
Recurring underspends from 2026/27
Potential to increase budget gap
Approved savings not delivered
Social Care Demands
Out of Area Placement Demands
Pay awards / Pay Pressures
Borrowing Costs
Council Tax Cap / Freeze
SG Grant Funding
Capital Plan Recharges Reduced
Price inflation
Cloud based / SaaS costs
Recurring overspends from 2026/27
APPENDIX 3
BUDGET ON A PAGE at 1 September 2026
Page 165

Page 166

Page 166

Page 167

Feb 2026 Sept 2026 Movment
Revenue Expenditure £000s £000s £000s
Service allocations 298,282     298,167        115-                
Adjustments to brought forward figure: 802                987                  185                
Opening budget 299,084     299,154        70                   
Pay and price increases 7,615           7,430              185-                 
(Decrease) / Increase in Loan Charges per budget 545                295                  250-                
New Burdens 85                   85                     -                 
Approved or noted for future years when budget set 8,046           8,046              -                 
Emerging -                 1,489              1,489           
Expenditure to be matched by Use of Earmarked Reserves 748                1,406              658                
TOTAL EXPENDITURE 316,123     317,905        1,782           
Revenue Funding
General Revenue Grant / NDRI 243,594     243,807        213                
LEIP funding -                 -                   -                 
New burdens funding not included in grant above 85                   85                     -                 
UKG funding for pEPR 3,359           3,359              -                 
Council Tax 63,590        63,590           -                 
Funding from Ear-marked reserves
Transformation 748                1,406              658                
MGD cash flow -                 -                   -                 
Service concession 301                301                  -                 
TOTAL REVENUE 311,677     312,548        871                
SAVINGS REQUIRED 4,446           5,357              911                
Savings Summary
Savings Approved:
Approved when budget set 3,882           3,901              19                   
Temporary savings including financial flexibility 117                117                  -                 
Further savings approved -                 -                   -                 
Indicative Savings from Transformation Programme 447                447                  -                 
Other savings proposed -                 166                  166                
-                 
Savings to be identified 0-                      726                  726                
TOTAL SAVINGS 4,446           5,357              911                
2026/27
APPENDIX 4
BUDGET OVERVIEW - Movement from Budget to 1 September 2026
Page 167

Page 168

Page 168

Page 169

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Hilda Jeynes and Eily
Webster
Contact Email: Hilda.jeynes@moray.gov.uk
Eily.webster@moray.gov.uk  
Subject: Draft Cooper Park Masterplan 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to ask Moray Council to agree the draft Cooper Park
Masterplan for public consultation.    
1.2  This report is submitted to Council in terms of Section II/ (19) of the Council’s Scheme of
Administration relating to a new policy matter which does not fall within the terms of
reference of any Committee.  
2.  SUMMARY  
2.1 The draft Cooper Park Masterplan provides a strategic framework to guide the future
development of the park. The draft Masterplan will be subject to a comprehensive public
consultation process for 8 weeks and will include drop-in events, workshops with Park
user groups, school engagement activities, and virtual consultation opportunities.
Feedback received through these methods will be reported to a future meeting of Moray
Council for consideration alongside the final Masterplan for approval. 
3.  RECOMMENDATIONS 
3.1  It is recommended that Council:   
i)  Agree the draft Cooper Park Masterplan and draft Delivery Plan, as set out in
Appendix 1 and 2, for public consultation for an 8-week period; 
ii) Note that a report on the consultation including analysis of responses and
the final masterplan will be reported back to a future meeting of Moray
Council for approval;   
iii) Agree delegated authority to the Strategic Planning & Development Manager
for formatting and graphics of the draft Masterplan and Delivery Plan; and
Item 9.
Page 169

Page 170

iv) Note that during the 8-week public consultation, the community will also be
asked to choose preferred locations for 2 x Multi Use Games Areas (MUGAs)
and a Pump Track. 
Hilda Jeynes
Senior Project Officer (Elgin Neighbourhood Board)
And 
Eily Webster
Service Manager Strategic Planning and Development 
4.  BACKGROUND AND CONTEXT  
4.1  In October 2023, Elgin was awarded £20m from the UK Government as part of their Long-
Term Plan for Towns.  The long-term town plan aims to put towns back into the hands of
local people, so that they can decide on local priorities and what is best for the long-term
future of the places where they live.  The initiative since then was rebranded twice to Plan
for Neighbourhoods and subsequently the Pride in Place programme.  Elgin is now part of
the Phase 1 Pride in Place Programme which commenced on 1 April 2026.  
4.2  The Elgin City Centre Masterplan, prepared by Moray Council and approved on 16
November 2021 (para 12 (iii) of minute refers) by the Planning and Regulatory Services
Committee, sets out the strategic vision for Cooper Park.  During the Elgin Neighbourhood
Board’s extensive engagement in 2024 and 2025, improvements to Cooper Park were
frequently cited as well as the desire for new or upgraded facilities within the park.
Investments in Cooper Park are currently underway through the following Council led
projects: Levelling Up Fund (LUF), Moray Growth Deal Early Years STEM and Moray Growth
Deal Cultural Quarter.  LUF secured funds to refurbish Cooper Park Pond and repurpose
the existing poor quality toilet provision to create a new café, toilets and changing places
facility.  Funding from the Moray Growth Deal Cultural Quarter project is spearheading
plans to bring nearby Grant Lodge back into use and fully funding the refurbishment of
Elgin Town Hall. The Moray Growth Deal Early Years STEM invested in the STEM Starts
Centre located in Elgin Library, opened in February 2026. 
4.3  The Elgin Neighbourhood Board is committed to providing further investment in Cooper
Park to enhance its role as a destination park and has identified the following potential
projects for exploration and delivery: 
• Fully accessible and inclusive play space;
• Bouldering area;
• Cycling proficiency track;
• Outdoor gym;
• Path upgrades;
• Solar lighting and signage;
• Landscaping to enhance biodiversity;
• New pavilion and multi-use games area; and
• Bicycle pump track.  
Page 170

Page 171

4.4  Given the significant investment planned for Cooper Park and community feedback
received by the Elgin Neighbourhood Board, it was agreed by both the Council and the
Elgin Neighbourhood Board that development of a strategic framework for the park is
needed. The Elgin Neighbourhood Board agreed to fund and take a lead on the
Masterplan, working closely with the Council as custodians of Cooper Park. The
Masterplan will guide improvements to sports and physical activity facilities, enhance
open spaces and connectivity, and create a diverse range of recreational and community
opportunities that support active and healthy lifestyles, tying together and complementing
existing attractions and developments already underway in the park. 
As part of the Masterplan development, it was important to establish whether all
proposals identified in section 4.3 can be accommodated within the park successfully and
without negatively impacting on the character and appearance of the open parkland and
ensure they align with the relevant trust purposes.  
4.5 MBLA Landscape Architects were appointed in August 2025 by Moray Council on behalf of
the Elgin Neighbourhood Board to develop a Masterplan and associated Delivery Plan that
reflects a shared vision by the community, Moray Council and many interested parties.  
4.6 The Delivery Plan, provided in Appendix 2 to the report, sets out each proposal, project
leads, funding sources and timescales where known and agreed. The final Delivery Plan
will also include indicative costs for each proposal, maintenance costs, phasing for a
programme of works and opportunities for cost/resource sharing between projects. There
is an opportunity to use the Delivery Plan to attract further public, private and
philanthropic funding into Cooper Park to fund costed proposals that will support to
achieve the shared vision. 
5.  DRAFT COOPER PARK MASTERPLAN  
5.1 The draft Cooper Park Masterplan prepared by MBLA Landscape Architects is provided in
Appendix 1 to the report. 
5.2 Moray Council are trustees for Cooper Park and are the responsible body for its day-to-day
operations and maintenance of facilities. This was carefully considered in the preparation
of the draft Masterplan, and a Steering Group was set up to support the development of
the draft Masterplan which consisted of the following representatives: 
• Cooper Park Community Sports Hub
• Moray Growth Deal Early Years STEM Project Manager
• Elgin Community Council
• Elgin Neighbourhood Board
• Climate Change Strategy Officer
• Moray Growth Deal Cultural Quarter Project Manager
• Service Manager Leisure and Culture
• Strategic Planning and Development Planning Officer
• Levelling Up Fund Project Officer
• Service Manager Open Spaces. 
Emerging proposals have also been discussed with other relevant Council departments
(e.g. Flood Team, Transportation, etc) to ensure these are supported and can be
maintained in perpetuity. 
Page 171

Page 172

5.3 The masterplan sets out a shared vision to:
• Conserve and enhance the Park’s historic features and reflect the Park`s rich
heritage in design proposals; 
• Provide for nature and improve the offer of the Park’s trees and biodiversity;
• Identify suitable locations for facilities befitting of a destination park without
detracting from the essence of the park and what makes it intrinsically special; and
• Build upon the STEM Starts Centre, refurbish Cooper Park Pond and repurpose the
Toilet Block and complement/enhance the proposals to refurbish Grant Lodge and
nearby Elgin Town Hall.
This shared vision reflects the aspirations of the community, users of Cooper Park and
Moray Council who is responsible for the maintenance of the park.  
5.4 As part of the Masterplan, Cooper Park has been split into the following 6 zones: 
• Zone 1 Pond
• Zone 2 Sports/Events/Recreation
• Zone 3 Sports/Play
• Zone 4 Grant Lodge
• Zone 5 River Lossie
• Zone 6 Walled Garden/Depot 
The Masterplan outlines the existing situation and proposals for each zone.  
5.5 The main proposals set out in the Masterplan are: 
• Connect with ongoing/recently delivered projects: Grant Lodge proposals, Pond
and Toilet Block proposals, STEM Starts Centre
• Introducing new features: Bouldering, Outdoor Gym and Nature Play, including
water play elements, small amphitheatre/events space
• Upgrading existing features: upgrades to the existing sports pavilion to transform it
into a modern sports pavilion, upgrades to the playpark to transform it into an
accessible and inclusive play area, explore opportunities to transform the former
Greenfingers site into a community growing space
• Improve lighting by introducing ground recessed solar lights to the circuit path to
link Bishopmill Bridge with Deanshaugh Bridge and introducing street lighting on
the path towards the Sports Pavilion
• Improve signage by introducing park information boards at entrances and
interpretation boards throughout the park
• Path upgrades to widen path and create paths to improve connectivity within the
park
• Enhance biodiversity by hedge planting, increasing horticultural offerings,
ecological and habitat creation, tree management and tree planting
• Change the character of the Main Drive from a road to a route that prioritises
pedestrians and cyclist over cars
• Improving pedestrian and cyclist safety by removing car parking spaces on the road
adjacent to the pond, but retaining disabled spaces at the library, and create an
overflow car park of 18 spaces at Lossie Wynd car park. 
Page 172

Page 173

6.  ENGAGEMENT TO DATE  
6.1  The draft Masterplan builds on extensive engagement undertaken since 2021; a big part of
the engagement was carried out before the existence of the Elgin Neighbourhood Board by
Moray Council as part of the development of the Elgin City Centre Masterplan.  At the start
of the Cooper Park Masterplan development process, during November and December
2025, the design team undertook further engagement to review previous findings and
ensure that the basis for the draft Masterplan continues to be in line with public feedback. 
6.2 During the development process, 45 park user groups were invited to a workshop session
to gather their thoughts, and 2 public drop-in events were organised to guide the direction
of the draft Masterplan, whilst an online survey on the Moray Engage platform was
available for 7 weeks for providing comments.    
6.3 15 user group representatives attended the workshop for a constructive session
which provided the design team with valuable information to consider in terms of
how groups use the park, what they see as challenges and opportunities. 
The two half day public drop-in sessions attracted 73 members of the public who were
asked for their general thoughts on the future of Cooper Park and their views on facilities
proposed as part of a Masterplan. The attendees expressed their preferences on the
proposals. 
The features which had the greatest support from attendees were as follows: 
• 23% - Water Play
• 23% - Bouldering
• 19% - Pump Track
• 12% - MUGA
• 11% - Outdoor Gym 
In response to the 3 options developed for the Sports Pavilion upgrade, the new build
option was by far the preferred option by attendees and users of the existing Pavilion. 
A detailed communications and stakeholder strategy can be found in Appendix D of the
draft Masterplan Report in Appendix 1 to this Report.    
7.  NEXT STEPS  
7.1 An 8-week extensive consultation will be undertaken for the draft Cooper Park Masterplan
by the Elgin Neighbourhood Board in partnership with the Council between 12 October
and 4 December 2026.    
7.2 The aim of this 8-week consultation is to ensure that the Masterplan reflects a shared
vision for Cooper Park and is developed in partnership with the community, in line with the
objectives of the Pride in Place Programme.  
7.3 During the 8-week public consultation, the community will also be asked to choose
preferred locations for 2 x Multi Use Games Areas (MUGAs) and a Pump Track. It is not
Page 173

Page 174

possible to locate these facilities in Cooper Park without negatively impacting on the
character of the open parkland, therefore alternative locations have been identified within
Elgin. The Elgin Neighbourhood Board have committed funding for 2 x MUGAs and a Pump
Track and will progress with design works this financial year for 1 x MUGA once preferred
location is selected by the community with construction taking place in 2027/28 for the
first MUGA subject to planning permission being granted. 
8.  SUMMARY OF IMPLICATIONS  
8.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial X 
Risk  X
Staffing X 
Best Value and Transformation X 
Property  X
Information Communications Technology/Digital     X
Equalities. Social Inclusion and Economic Impact            X 
Climate Change and Biodiversity Impact           X   
8.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
8.3 Policy and Legal 
Subject to approval by Council, the Masterplan will become planning guidance which will
be a material consideration in the determination of planning proposals.    
8.4 Financial
Page 174

Page 175

The development of the Masterplan has been funded by the Elgin Neighbourhood Board. 
Proposals funded and delivered by the Elgin Neighbourhood Board will become Council
assets but funding towards the maintenance of these assets will be provided by the Elgin
Neighbourhood Board via a maintenance bond. 
The Quality Surveyor who is part of the design team will make recommendations on
annual maintenance costs required for proposed facilities. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments       
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
8.5 Risk 
None arising from this report.  
8.6 Staffing 
The Masterplan is being prepared by the landscape architect led design team, supported by
the Elgin Neighbourhood Board Senior Project Officer and Project Officer and various
officers from other Council services, including Leisure and Culture, Open Spaces, Strategic
Planning and Development, Levelling Up Fund, Moray Growth Deal Cultural Quarter, Moray
Growth Deal Early Years STEM, Transportation, Environmental Health and Legal. 
8.7 Best Value and Transformation 
The Masterplan sets out a strategic framework to guide the future of Cooper Park including
ongoing projects that will transform the park. The Masterplan sets out an approach to link
projects together, identify any potential cost/resource savings and the public consultation
will identify community priorities to guide future investment decisions to ensure best value. 
8.8 Property 
None arising from this report.  
8.9 Information Communications/Technology/Digital 
None arising from this report.  
8.10 Equalities, Social Inclusion and Economic Impact   
Does the proposal have the
potential to affect people from the
Yes Maybe No
Page 175

Page 176

below categories differently to the
wider Moray population: 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ✓ ☐ ☐
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
✓ ☐ ☐ ☐ ☐
Human Rights of individuals ☐ ☐ ✓ ☐ ☐
Rights of Children or Young People
(UNCRC)
✓ ☐ ☐ ☐ ☐
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
There is potential for some differential impacts. An IIA will be developed and informed
using the consultation feedback, with mitigations built into the final Masterplan and
Delivery Plan.   
8.11 Climate Change and Biodiversity Impacts 
The draft Masterplan has been prepared in consultation with the Climate Change Strategy
Officer to ensure biodiversity enhancements are included; proposed tree removals and tree
planting are carefully considered to guarantee that the right species are planted which will
thrive in the park for years to come. 
9.  CONSULTATION  
9.1 This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Growth, Planning and Climate (Chief Planning Officer), Chief
Financial Officer, Service Manager Leisure and Culture, Service Manager Environmental
Services, Open Spaces Manager, Moray Growth Deal Cultural Quarter Project Manager,
Moray Growth Deal Early Years STEM Project Manager, Levelling Up Fund Senior Project
Manager, Service Manager Legal Services, Service Manager Democratic Services,
Principal Climate Change Officer, Senior Engineer Transportation, Equal Opportunities
Officer and any comments made have been incorporated into the report. 
10.  BACKGROUND PAPERS       
Page 176

Page 177

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author:                                                       Joseph Duggan Contact Email: Joseph.duggan@moray.gov.uk 
Subject: Community Wealth Building Strategy Update 
1.  PURPOSE 
☒ For Decision      ☐ For Information 
1.1  The purpose of this report is to provide an update to Council on the Community Wealth
Building Strategy, the new legislative requirements and to agree to the additional actions
outlined in the report.  
1.2  This report is submitted to Council in terms of Section III (F) (2) of the Council’s Scheme of
Administration to exercise the statutory functions of the Council in relation to economic
development in terms of paragraph 171 of the Local Government (Scotland) Act 1994  
2.  SUMMARY  
2.1  This report provides an update on the status of the Council's Community Wealth Building
(CWB) Strategy, which was approved in 2024. It provides an update on key areas of CWB
activity since the previous report, including the Community Identified Benefits (CIB)
Portal, procurement research undertaken by the Centre for Local Economic Strategies
(CLES), and Community Wealth Building Planning Guidance.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Council:   
i. Notes the passing of the Community Wealth Building (Scotland) Act 2026 and
its implications for the Council as a local authority; 
ii. Notes progress on the implementation of the Community Wealth Building
Strategy, including developments relating to the Community Identified
Benefits Portal, the Centre for Local Economic Strategies procurement
research, and Community Wealth Building Planning Guidance; 
iii. Agrees that the Community Planning Partnership and the Community Planning
Officer Group are asked to oversee the process of preparing the Council and
Item 10.
Page 177

Page 178

partners to comply with the requirements of the Act; 
iv. Agrees to the review and update of the Council's Community Wealth Building
Planning Guidance to improve its effectiveness, including the early
involvement of Moray Pathways. 
Joseph Duggan
Community Wealth Building Officer 
4.  BACKGROUND AND CONTEXT  
4.1  The Council's Community Wealth Building (CWB) Strategy and Action Plan, published in
2024, aims to retain wealth within the local economy by increasing local spending,
supporting inclusive business ownership, and placing greater control and benefits in the
hands of local people and communities. See Appendix 1 and Appendix 3 for an update
on the strategy's key performance indicators and action plan.  
4.2  Due to staffing constraints, the implementation of the strategy has been limited, with a
member of staff being in post since 2 June 2025 funded externally via the UK Shared
Prosperity Fund. This post has been divided between Community Wealth Building and
developing a Socio-Economic Benefits Maximisation Plan for future energy developments.
From July 2026, the socio-economic benefits aspect of the role will be continued until July
2027 with funding from the Transformation Reserve. The CWB strategy and action plan will
be taken forward by a development officer within the Economy and Enterprise team 3 days
a week.  
4.3  The Community Wealth Building (Scotland) Act 2026 received Royal Assent on 25 March
2026. The substantive provisions, including the duty on local authorities to prepare and
publish a Community Wealth Building action plan, are not yet in force and will come into
force on a date appointed by Scottish Ministers by regulations. Officers have been in
contact with the Scottish Government's Community Wealth Building team, who have
indicated that commencement is anticipated following the summer recess 2026, which
would require local authorities to publish a joint action plan with statutory partners by
2029 at the latest. Scottish Ministers will also have 18 months from commencement to
publish statutory guidance on action plans, which named public bodies must then have
due regard to when developing their corporate plans and delivery strategies. The
legislation will require the following from councils: 
• The Council is required to form a Community Wealth Building Partnership with the
following organisations named in the Act (where applicable): 
o UHI Moray - as the regional college situated within the Moray Council area
o NHS Grampian - as the Health Board whose area includes the Moray
Council area
o Highlands and Islands Enterprise - as the enterprise agency whose area
includes the Moray Council area
o Skills Development Scotland
o HITRANS (Highlands and Islands Transport Partnership) - as the regional
Transport Partnership whose region includes the Moray Council area 
• The newly formed Community Wealth Building Partnership must jointly prepare and
Page 178

Page 179

implement a Community Wealth Building Action Plan within three years of the Act
coming into force. 
• A community wealth building action plan must set out the measures the
community wealth building partnership is taking, or intends to take, to facilitate and
support the generation, circulation and retention of wealth in the local economy. It
must include an indicative target for the percentage of the total expenditure
incurred pursuant to public contracts entered by the community wealth building
partners which is to go to local economic operators. 
• In contributing to the preparation of a community wealth building action plan, a
local authority must consult- 
a. such persons as it considers likely to be directly affected by the community
wealth building action plan,
b. such persons as it considers representative of the interests of—
i. the community,
ii. businesses,
iii.  third sector bodies (as defined by section 37(1) of the Community
Justice (Scotland) Act 2016),
iv. social enterprises,
within the area of the local authority, and
c. such other persons as it considers appropriate. 
• No additional resources have been allocated to local government to support
delivery of these duties, making it essential that CWB is embedded across all
service areas and reflected in existing budget planning processes. As CWB is due
to become a statutory duty, a transfer of responsibility from the Business Gateway
Adviser role where this was hosted before June 2025 to a Development Officer role
within the wider Economy and Enterprise Team has been actioned. This role will
cover CWB 3 days per week. Please see Appendix 2 for a proposed timeline to
prepare the Council for the upcoming legislative requirements. 
5.  PROGRESS UPDATE  
5.1  Since the launch of the Community Identified Benefits (CIB) Portal in November 2025, 10
businesses and 28 community groups have registered on the platform. To date, one
request has been fulfilled, with Balfour Beatty offering support to Inspiring Darts, an Elgin-
based community group. The CWB Officer is working with procurement and other teams
to actively promote the portal to businesses and community groups across Moray and to
link it to major contracts being awarded through public bodies. 
5.2  In January 2026, the Centre for Local Economic Strategies (CLES) was commissioned to
research the Council's procurement spend and practices. The purpose of this was to
establish a benchmark figure for local spend and to identify key barriers and opportunities
for improvement. The research found that 14% of the Council's total procurement spend
went to businesses with a registered address in Moray. Local spend was officially reported
to be 26.8% for 2024-25, however this figure includes businesses with both a registered
and operational address in Moray. The possibility of splitting this data into two categories -
businesses with a registered address only, and those with both a registered and
operational presence - will be explored to improve the accuracy of reporting against the
Page 179

Page 180

existing strategy's ten-year local spend target of 30%. As part of the research, CLES held a
workshop with senior officers to better understand the challenges and opportunities for
increasing local and regional spend across service areas. Key recommendations included: 
• Deepen collaboration across departments
• Embed CWB across Council systems and ways of working
• Develop and better engage the local supply base in Moray
• Develop a common strategy with anchor partners 
The findings will form the basis of forthcoming discussions with relevant teams across the
Council. 
5.3  Since 2024, the Council has had Community Wealth Building Planning Guidance in place
in response to Policy 25 of National Planning Framework 4. The guidance aims to increase
employment opportunities and local spend, provide skills development opportunities
particularly in areas of highest inequality, support new business start-ups, and create
opportunities for community ownership of business and assets. To date, the guidance has
had limited impact due the level of resources available to enforce it effectively. It is
therefore proposed that the guidance be reviewed and updated to improve its
effectiveness, with a key change being the early involvement of Moray Pathways in the
planning process to ensure that developers are maximising employment and skills
opportunities for people in Moray. The process of updating the guidance is expected to
take between two and three months. 
5.4 
5.5 
As part of the Council's commitment to embedding Community Wealth Building across
existing teams, a part-time role is being allocated within the Employability team to focus
on community benefits in procurement. This will involve working with procurement teams
and contract managers to connect community benefit commitments in contracts to local
employment and skills opportunities, maximising the social and economic impact of the
Council's procurement spending for people in Moray. 
The Moray Anchor Network (MAN), which comprises large public and third sector
organisations in Moray, was designated as the body to take forward the Community
Wealth Building Strategy. Upon its foundation, the following organisations formed the
MAN: Moray Council, NHS Grampian, UHI Moray, Highlands and Islands Enterprise, Crown
Estate Scotland, tsiMORAY, Ekopia Resource Exchange, Moray Chamber of Commerce
and Federation of Small Business. However, MAN's effectiveness in this role has been
limited due to difficulties with partners having the resources and capacity to engage
meaningfully on what has been a discretionary activity to date, coupled with a lack of high-
level visibility of the work within the Council and partner organisations. The proposals set
out in Section 6 are intended to address this by establishing a more focused governance
structure and formalising partner engagement in line with the requirements of the Act. 
6.  PROPOSALS 
It is proposed that: 
6.1  The Community Planning Partnership and Community Planning Officer Group are asked to
be the vehicle to support and explore the refresh of Moray's Community Wealth Building
Strategy in line with the new statutory framework.    
Page 180

Page 181

6.2  A review and update of the Community Wealth Building Planning Guidance is required to
improve its effectiveness, including the early involvement of Moray Pathways in the
planning process to ensure that developers are maximising employment and skills
opportunities for people in Moray.  
7.  SUMMARY OF IMPLICATIONS  
7.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ☒ 
Policy and Legal ☒ 
Financial  ☒
Risk ☒ 
Staffing ☒ 
Best Value and Transformation ☒ 
Property ☒ 
Information Communications Technology/Digital  ☒
Equalities. Social Inclusion and Economic Impact  ☒ 
Climate Change and Biodiversity Impact ☒ 
7.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
7.3  Policy and Legal 
The passing of the Community Wealth Building (Scotland) Act 2026 creates a statutory
duty for the Council to prepare and publish a Community Wealth Building action plan
jointly with its relevant statutory partners, and to implement that plan so far as reasonably
practicable. The proposals in this report are intended to support the Council in meeting
this duty. No other legal implications arise from this report.  
7.4  Financial 
The proposals in this report involve no additional cost or financial implications to the
Page 181

Page 182

Council's core budgets. The socio-economic benefits aspect of the current CWB Officer
role will continue to be funded from the Transformation Reserve until July 2027. Any
future resourcing requirements arising from the Council's statutory CWB duties will be
considered as part of normal budget governance processes. 
7.5  Risk 
The Council faces a number of risks in relation to the implementation of the CWB Strategy
and its upcoming statutory obligations. The current Community Wealth Building Officer
post is funded until July 2026. From the 17th of July, while a Development Officer will cover
this remit 3 days a week, there will be no full-time, dedicated resource to drive the strategy
forward. Embedding a council-wide approach of this kind across all services takes time
and requires sustained resource which is challenging given this legislative duty has not
received central funding. Failure to adequately resource the preparation of the CWB
Action Plan within the statutory timescale would place the Council at risk of non-
compliance with its legal duties under the Act. The passing of the Community Wealth
Building (Scotland) Act 2026, and the statutory framework it will create once commenced,
will provide a clearer basis within which to prioritise and resource Community Wealth
Building going forward.  
7.6  Staffing 
From July 2026 there will be no full-time post dedicated to Community Wealth Building. As
CWB is due to become a statutory duty, a transfer of responsibility from the Business
Gateway Adviser role to a Development Officer role within the wider Economy and
Enterprise Team has been actioned. This role will cover CWB 3 days per week. No other
staffing implications arise from this report.  
7.7  Best Value and Transformation 
Improving the effectiveness of CWB implementation ensures best value for Moray, as its
core purpose is to maximise the benefit the Council and other local public sector bodies
derive from their existing resources for the benefit of the local area. Establishing a more
focused governance structure through the Community Planning Partnership and the
Community Planning Officers Group, and formalising partner engagement in line with the
requirements of the Act, supports an efficient and effective approach to delivery.  
7.8  Property 
The Act requires the CWB Partnership to consider how common good land and assets can
further CWB aims. Moray Council holds common good assets across a number of former
burghs including Elgin, Forres and Buckie, and a review of these will be required as part of
preparing the joint CWB Action Plan. The Estates Team will need to be engaged in this
process to ensure land and property considerations are fully integrated into Moray's
refreshed CWB Strategy and Action Plan.  
7.9  Information Communications/Technology/Digital 
None arising from this report.  
7.10  Equalities, Social Inclusion and Economic Impact 
The proposals in this report have the potential to deliver positive equalities, social
inclusion and economic impacts. Greater effectiveness in implementing the CWB
Strategy, including improved local procurement, increased use of the CIB Portal, and the
development of a joint CWB Action Plan with statutory partners, could increase the
proportion of public sector spend benefiting local businesses and communities,
Page 182

Page 183

contributing to a reduction in poverty and inequality in Moray.  
7.11  Climate Change and Biodiversity Impacts 
There are potential positive implications arising from this report. Increasing local
procurement and supply chain activity would serve to shorten supply chains and reduce
the associated carbon and environmental impacts, contributing to the Council's climate
change objectives. 
8.  CONSULTATION 
8.1  This report has been prepared in consultation with Executive Director Economy; Head of
Service Growth, Planning and Climate; Chief Financial Officer; Service Manager
Democratic Services; Principal Climate Change Officer; Equalities Officer; Service
Manager Economy and Enterprise; Service Manager Strategic Planning and Development;
Head of Service People, Change and Community Strategy; Service Manager Community
Strategy and Engagement, and any comments made have been incorporated into the
report. 
9.  BACKGROUND PAPERS  
9.1  Community Wealth Building (Scotland) Act 2026 
Community Wealth Building Strategy, Moray Council, 2024 
CLES Procurement Research Report, January 2026 
Page 183

Page 184

Page 184

Page 185

Appendix 1 
Percentage of the
Council’s
procurement
spend with Moray
based businesses
(figures
calculated by
operational and
registered
address
combined).
25.2% 24.8%  23.6% 26.8%
(14% to
businesses
with a
registered
address in
Moray)
Percentage of the
Council's spend
going to North and
North East
Scotland
(Highlands, Moray,
Aberdeenshire and
Aberdeen City).
Target: 50%
Not
found
42.98% 43.9% 43.79%
Proportion of
people earning
less than the Living
Wage.
19.4% 14.3% 14.4% 16.2%
Median earnings in
pounds for
employees living in
Moray.
£565.5 £619.50 £647.20 £688.80
Gender pay gap. 22.7 %
(2021)
17.8%
(2022)
12.5% 16.3%
Number of
Community Asset
transfer requests
approved &
completed.
1 3 1 0
Percentage of
contracts
commenced
during the year
which deliver
community benefit
in Moray. Target:
20%
7.82 11.11%  10.98% 8.84%
Page 185

Page 186

Page 186

Page 187

Appendix 2 
CWB Act compliance timetable
Community Wealth Building (Scotland) Act 2026 - indicative timetable for Moray Council
Note on commencement: The Act received Royal Assent on 25 March 2026. The substantive
provisions, including the three-year action plan duty, will come into force on a date appointed by
Scottish Ministers by regulations. All deadlines below are indicative and will run from the date of
that commencement order. Moray Council's preparatory work begins in advance of
commencement to ensure readiness. 
September 2026 ► Report to committee
Committee approves report and establishes short-life working group
The Community Planning Partnership and Community Planning Officers
Group used to drive CWB compliance forward 
October–
December 2026 Inform statutory partners of upcoming obligations under the Act
Write formally to NHS Grampian, HIE, UHI Moray, Skills Development
Scotland and the Transport Partnership advising them of their upcoming
statutory duties and proposing initial joint officer meetings
Begin forming the CWB Partnership
Hold initial joint officer meetings, identify lead contacts in each partner
organisation and agree a basic governance framework on a voluntary basis
in advance of commencement 
2026 - Ongoing Foundational work underway
Common good asset audit; gap analysis of existing 2024 strategy against the
Act; procurement baseline data gathered across all statutory partners;
informal stakeholder engagement with tsiMORAY, Chamber of Commerce
and community planning structures
CWB Partnership meeting regularly
Voluntary partnership operating ahead of commencement, building shared
understanding and governance capacity across all five statutory partner
organisations
Monitor for commencement order and Ministerial guidance
Commencement order could arrive at any time - Moray should be ready to
comply. Scottish Ministers must publish CWB guidance within 18 months of
commencement 
Commencement
order made (~ late
2026)
► Three-year period starts from this date
Statutory obligations commence
Action plan duty and all other substantive provisions come into force and
must be published within 3 years. Moray's preparatory work means the
partnership is already in place and ready to move to drafting once guidance
is published 
Page 187

Page 188

Guidance
published (within
18 months of
commencement)
► Statutory deadline — 18 months from commencement
Begin drafting the CWB Action Plan
CWB Partnership reviews guidance, assesses any gaps against foundational
work already completed, agrees plan structure and priority measures, and
begins joint drafting 
Draft plan agreed
by Partnership
(Early 2028) 
Draft CWB Action Plan agreed by all statutory partners
Draft includes local spend target, progress indicators, common good asset
consideration and measures across all five CWB pillars.  
Statutory
consultation
period
Statutory public consultation on draft plan
Formal consultation under Section 5(12) - engaging community
representatives, businesses, third sector and social enterprises across
Moray
Publish consultation report
Section 5(13) requires a published report setting out the consultation
process and how views expressed were taken into account 
Within 3 years of
commencement
(~ 2029)
► Statutory deadline - 3 years from commencement
CWB Action Plan published
Final joint CWB Action Plan published by Moray Council on behalf of the
CWB Partnership
Present to Community Planning Partnership
Refreshed strategy presented to CPP for noting and alignment with partner
delivery plans 
Page 188

Page 189

Appendix 3
SPENDING
Action Lead Key Partners Status Update / Progress
Establishment and launch of
Community Identified Benefits List
within Moray Council.
Moray Council CSU, Business
Gateway Moray,
MC Procurement
Complete   The portal was launched in September 2025.
Work with anchor partners to embed
voluntary community benefits where
relevant and proportionate in
procurement activities below £4m.
Community
Support Unit
(CSU)
tsiMORAY, HIE,
NHS Grampian,
UHI Moray, MC
Procurement,
EG&R, CSU
Ongoing The anchor network is still in the process of being
reestablished after a pause since the previous CWB
officer went on maternity leave. 
UHI Moray: we in partnership with Moray Pathways are
working with the main contractor for the Town Hall to
develop employability opportunities for 12 individuals
through the Moray SWAP programme. Its early days but
the plan is for the individual to spend approx. 3 weeks with
the various sub contractors on the site to gain experience,
industry exposure and potentially either an
apprenticeship, lower skilled role or placement through
MERY. We have had an initial discussion and planning to
run a pilot in September for 1 individual and see how it
work before developing the main programme in
November. 
Establish working group with
neighbouring public agencies in
Highland, Aberdeenshire and
Business
Gateway
Moray
MC Procurement Ongoing There has been limited progress with this action. The
North East Anchor Network consisting of Moray,
Aberdeenshire and Aberdeen City is in the process of
Page 189

Page 190

Aberdeen to identify best practice and
shared learnings to grow regional
spend.
being reestablished.
Refresh the Supplier Development
Forum strategy to analyse the barriers
to local enterprises bidding for local
contracts and identify best methods to
grow local spend.
EG&R HIE, NHS
Grampian, UHI
Moray, MC
Procurement, CSU,
tsiMORAY
On Hold Limited resources to progress this action. However, CLES
was commissioned to write a report on the Council’s
procurement spend which includes recommendations on
how to increase local spend.
Identify needs for CWB training for
staff within Moray Council and other
Anchor partners.
EG&R MC Procurement
Team, HIE, NHS
Grampian, UHI
Moray
Ongoing The areas of training have been identified. However, there
are limited resources to facilitate the levels of training
needed.
Explore feasibility of the establishment
of a local Business Database to
increase awareness amongst Anchors
of the local business base.
Business
Gateway
Moray
Moray Chamber,
FSB
Complete A Microsoft form has been developed for local businesses
to input their details into a local business database. This
will need to be promoted further to make it a meaningful
resource.
Work with all project managers to
embed a local spend action plan
within major projects or contracts.
Business
Gateway
Moray
UHI Moray, DHI,
Moray Council
On Hold Limited resources to progress this action. This will require
CWB to be embedded throughout the Council’s
processes.
Maximise local supplier access to
dedicated training sessions through
Supplier Development Programme to
upskill local suppliers on how to
tender.
Business
Gateway
Moray
MC Procurement Ongoing  Moray Council is no longer a member of the Supplier
Development Forum. However, Business Gateway is using
its resources to progress this action.
Page 190

Page 191

Provide support to local business to
get business tender ready.
Business
Gateway
Moray
Business Gateway
Moray
Ongoing On 20th November 2025, a procurement event was help at
UHI Moray for local businesses to learn more about
upcoming contracts and to help them become tender
ready.
Annual procurement workshop with
Moray Social Enterprise Network with
attendance from procurement
representatives from Moray Council.
tsiMORAY &
EG&R
N/A On Hold Last one held on 16th January 2025.
Encourage social enterprises to avail
from procurement support offered by
dedicated support bodies.
tsiMORAY N/A On Hold Limited resources to progress this action.
Fair Work promotional campaign to
champion local business that are
embedding Fair Work practices into
their business.
EG&R Chamber, FSB, HIE,
DYW
On Hold Limited resources to progress this action.
Provide ongoing business support to
businesses and organisations in Moray
to adopt Fair Work practices and
approaches.
Business
Gateway
Moray
DYW, HIE On Hold Limited resources to progress this action.
Undertake an in-depth review of the
causes of the Gender Pay Gap and
create an action plan to address the
underlying issues.
MEP HIE, UHI Moray,
Chamber,
tsiMORAY
On Hold Limited resources to progress this action.
Page 191

Page 192

Work with contracts managers and
procurement teams to embed scoring
of CWB criteria including Fair Work
Criteria within Anchor procurements
where relevant and proportionate.
Business
Gateway
Moray
MC Procurement
Team, HIE, UHI
Moray, NHS
Grampian
Ongoing This action is underway but still at an early stage.
Annual report collating number of
strategic policies or decisions
influenced by CWB approach.
Moray Anchor
Network
Moray Anchor
Network
On Hold Limited resources, awareness and collaboration to
progress this action.
WORKFORCE
Action Lead Key Partners Status Update / Progress
Increase the provision of professional
development courses and skills
academies to upskill the local
workforce.
UHI Moray EG&R, HIE Ongoing  UHI Moray: We supported 9 underemployed parents 
through the Moray SWAP last contact year to upskill and
continue this under the new contracts awarded in April
2026. I can’t provide specific figures at the moment for
this contract year as we don’t yet have our contract from
Moray Council with agreed targets. 
Provide training and skills required to
support Moray's shift towards Net
Zero.
UHI Moray SP&D, EG&R, HIE,
tsiMORAY, Climate
Action Network
On Hold No updates.
Identify new models of childcare for
Moray to address shortfalls in wrap
around care (0–5).
MEP Moray UHI, Care
Commission
Ongoing No updates. Improvement in the Workforce- Step into
Childcare course developed with UHI Moray to encourage
more people into the sector. MERI placements to support
Page 192

Page 193

growth. Business Growth Course for current Providers,
with Grant Scheme to support development. 
Places- New provider of school age care at Kinloss, along
with change in provider at the Nursery, preventing closure.
Change in provider at Keith, with plans to expand.
Childminding recruitment, with partnership now
developed with SCMA. Partnership working with Transport
Department to enable transport to childcare to support
provider at Duffus (this learning is now being used to
develop a provision in Speyside) Moray has just been
awarded funding for Children’s Activities to develop new
provision to support families to work, train and learn. 
Take a CWB approach to providing use
of public assets.
EG&R HIE, tsiMORAY,
EC&O
Ongoing Limited resources to progress this action. This will require
a systematic review of Council assets to determine how it
can be used to further the CWB strategy and to generate
wealth for Moray.
Limited resources to progress this action. This will require
a systematic review of Council assets to determine how it
can be used to further the CWB strategy and to generate
wealth for Moray.
Work to support community management of the Falconer
Museum, Forres is ongoing
An in-principal partnership approach to developing Grant
Park Forres is being sought.
Support development of M.Connect
service and other community travel
Environmental
& Commercial
tsiMORAY, EG&R Ongoing No updates. Bus Revolution has continued to deliver
significant improvements to public transport connectivity
Page 193

Page 194

projects to ensure all communities are
able to access transport when
required.
Services across Moray through a combination of demand
responsive transport and timetabled bus services
operating under the m.connect brand. Since launch in
May 2023, passenger journeys have increased from a
baseline of 45,881 journeys in 2022/23 to 85,309 journeys
in 2025/26, exceeding the project's planned growth
trajectory and demonstrating increased use of public
transport to access employment, education, healthcare
and community facilities across Moray. 
A key element of project delivery has been collaboration
and engagement with communities and partner
organisations to better understand transport need and
barriers to access Public transport services. This has
included engagement with local communities across
Moray, annual transport surveys, work with Moray
Pathways, Developing the Young Workforce, the
Department for Work and Pensions, education providers
and local businesses. The feedback and evidence
gathered through this process directly informed the
service enhancements and network developments
introduced through Phase 1 & 2 of the project, ensuring
investment was targeted towards communities and travel
needs where the greatest benefit could be achieved. 
The project has also delivered wider benefits through the
creation of additional employment opportunities within
Page 194

Page 195

the Public Transport Unit and the development of training
pathways into vocational driving positions through
partnership working with DWP and employability services.
Looking ahead, Phase 3 will focus on developing
advanced data and analytical tools, service optimisation
and evidence-led planning to ensure future investment
decisions maximise social, economic and community
benefits. This work will support the development of future
network expansion proposals and help target investment
towards communities experiencing the greatest transport
and accessibility challenges in Moray. 
Review current digital infrastructure
and rollout of R100 programme to
identify gaps in provision. Develop
campaign to raise awareness of
Scottish Broadband Voucher Scheme.
Strategic
Planning &
Development
(SP&D)
EG&R Until
2030
No updates
Embed the requirement for skills
development and training programmes
within developer obligations and
community benefit statements, linked
to delivery of NPF4 Policy 25.
Moray Local
Employability
Partnership,
SP&D
Scottish
Government,
Moray Council, HIE
Ongoing This action is underway. However, we are looking into how
to better enforce it and to secure the greatest possible
benefits from the planning process.
INCLUSIVE OWNERSHIP
Action Lead Key Partners Status Update / Progress
Page 195

Page 196

Support promotion and awareness
raising of Just Transition Fund to local
business community and third sector.
tsiMORAY,
Business
Gateway
Moray
EG&R, Chamber,
FSB
Ongoing  updates. Just Transition Fund bid for 2026/27 was
submitted in May 2026. Engagement for subsequent
rounds will commence from September 2026. 
Deliver business support programmes
for businesses in Moray.
Business
Gateway
Moray, HIE
EG&R, Chamber Ongoing Underway but impact limited due to insufficient
resources.
Raise awareness of employee
ownership and co-operative business
models.
Business
Gateway
Moray
Cooperative
Development
Scotland,
Chamber, TSI
Moray
On Hold Limited resources to progress this action.
Support increased promotion of the
Moray Loves Local Campaign.
EG&R Business Gateway
Moray
Ongoing The Moray Gift card continues to be promoted by the
Economy & Enterprise and Business Gateway teams.
Support Moray Anchor Network project
managers with embedding a CWB
approach within the business plans for
major capital and infrastructure
projects including Moray Growth Deal,
Levelling Up, long term town plan and
schools.
EG&R, SP&D Business Gateway
Moray
Ongoing Progress has been made with this action. Funding secured
from RCGF funding for Grant Lodge.  £1,1m awarded and
team working to resolve the remaining funding gap, with
report due to go to Elected Members late 2026.   
Provide ongoing promotion of external
funding opportunities through existing
Anchor communication channels.
MC Corporate
Comms,
EG&R, SP&D
ALL Ongoing No updates.
Page 196

Page 197

Assist with developing and submitting
funding applications on behalf of
community organisations where the
local authority is designated as lead
applicant.
EG&R ALL Ongoing No updates. Development and delivery of £3.3M Forres
Conservation & Heritage Scheme approved in 2024/25.
RTIF application submitted on behalf of Rothes Way
Association in May 2025.
RCGF community applications submitted in August 2026
on behalf of Leanchoil Trust, Dufftown Clock Tower, Moray
Athletics Hub.
Support and promote Corporate Social
Responsibility, pro-bono and
volunteering schemes to increase
capacity of third sector.
tsiMORAY HIE, tsiMORAY Ongoing This is being helped by the Council’s Community
Identified Benefits Portal.
Encourage Anchor partners to offer an
annual volunteering allowance for
employees to expand volunteering
capacity in support of the third sector.
ALL CSU Ongoing No updates.
LAND AND PROPERTY
Action Lead Key Partners Status Update / Progress
Maximise the use of outdoor space for
community benefit such as green
spaces, woodlands, community food
growing, biodiversity activities, play
areas, renewable energy etc.
SP&D tsiMORAY, CSU Ongoing No updates.
Page 197

Page 198

Promote the availability of vacant,
underused public assets.
EG&R Elgin BID,
Chamber, FSB,
SP&D
Ongoing  RCGF applications for vacant and underused assets have
been submitted.  Approval received for Grant Lodge.
Support for re-opening of the Falconer Museum, Forres
Reduce any identified barriers and
support communities to have the
adequate knowledge and skills to take
on the ownership/management of
public assets.
CSU tsiMORAY Ongoing  Professional resource provided to ‘the Falconer Museum’
SCIO to support the transition to community
management.
Promotional campaign to celebrate the
success of CATs in Moray to raise
awareness and stimulate further
interest.
CSU tsiMORAY On Hold Limited resources to progress this action.
Implement CWB planning guidance for
all upcoming major developments
including wind farms to support skills
development, local supply chains and
community development.
SP&D Chamber, FSB Complete This guidance is in place. However, work is underway to
improve its enforceability and to ensure the Council is
getting the most out of the guidance.
Maximise local impact of Developer
Obligations to provide community
infrastructure, linked to NPF4 Policy.
SP&D HIE, Chamber,
tsiMORAY
Ongoing No updates.
FINANCE
Action Lead Key Partners Status Update / Progress
Page 198

Page 199

Support the engagement with large
employers including anchor partners in
the region to encourage the uptake of
the Credit Union Workplace Savings
scheme.
Business
Gateway
Moray
Chamber, FSB On Hold Limited resources to progress this action.
Raise awareness of small business
loans that can be offered through the
Moray Firth Credit Union.
Business
Gateway
Moray
Chamber, FSB Ongoing This is being done by the Business Gateway. However, we
have limited information on the number of businesses
applying for loans with Moray Firth Credit Union.
Deliver against the Scottish
Government target of ensuring at least
1% of all funding decisions are
conducted by PB.
Moray Council CSU, EG&R Ongoing  £200k UK Shared Prosperity Fund (UKSPF) grants
£233k Coastal Community Fund (CCF) grants
Increase the number of local funding
programmes awarded by PB, for
example Just Transition.
tsiMORAY CSU Ongoing PB undertaken for allocation of Arts, Culture & Heritage
UKSPF grants 2023-2025
PB undertaken for allocation of CCF grants 2025 and 2026
Develop CWB supplementary planning
guidance that will ensure future
developments in Moray deliver on
supporting local jobs and the local
community.
SP&D Business Gateway
Moray
Complete This has been developed. However, work is ongoing to
improve the outcomes of it.
Deliver targeted investment
programmes providing employment
land and housing in rural/deprived
areas through delivery of the Local
SP&D EG&R Ongoing No updates.
Page 199

Page 200

Development Plan and NPF4 Policy.
Increase awareness of and support the
growth of Community Benefit Societies
in Moray.
tsiMORAY N/A On Hold Limited resources to progress this action.
Explore and research the use of
Community Municipal Investment
Funding for Renewable Energy
Projects.
SP&D N/A Ongoing This is being reviewed as part of the work going into the
Socio-Economic Benefits Maximisation plan.
Explore the feasibility of public sector
investment into existing Renewable
Energy Schemes.
SP&D N/A Ongoing This is being reviewed as part of the work going into the
Socio-Economic Benefits Maximisation plan. 
Page 200

Page 201

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director - Economy, Enterprise and Operations      
Author: George Gunn Contact Email: george.gunn@moray.gov.uk 
Subject: Just Transition Fund 2026/27 update 
1  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to provide an update to the Council on the progress of its bid
to the Scottish Government’s Just Transition Fund for financial year 2026/27, and to agree
next steps.  
1.2  This report is submitted to Council in terms of Section III (F) (2) of the Council’s Scheme of
Administration relating to provision, development and monitoring of Economic
Development and Infrastructure Services.  
2.  RECOMMENDATIONS  
2.1  It is recommended that Council:   
i)  Notes the progress made since January 2026 to advance Moray’s position for
future funding from the Scottish Government’s Just Transition Fund (JTF); 
ii)  Notes the submission of a funding bid to the JTF for 2026/27 on 7 May 2026
and welcomes the successful outcome of that bid, securing up to £1.2m to
deliver two strategic projects with partners;   
iii)  Agrees that Officers should continue ongoing development of projects and
funding proposals to ensure that the Council is well positioned to respond to
future Just Transition Fund opportunities; and 
iv)  Agrees that the Council Leader and Officers should continue to engage with
the Scottish Government and partners including Moray’s MPs and MSPs on
work to date and the needs of Moray in respect of a just transition. 
Item 11.
Page 201

Page 202

George Gunn FRGS
Senior Project Officer  
3.  SUMMARY  
3.1  This report provides an update on the Council’s progress in securing funding through the
Scottish Government’s Just Transition Fund for 2026/27. Following submission of bid in
May 2026, the Council has secured up to £1.2m to support the Buckie Harbour
Redevelopment and Green Energy Parks projects. The report also sets out proposed next
steps to progress delivery and maintain the Council’s position to secure future JTF
investment for Moray. 
4.  BACKGROUND AND CONTEXT  
4.1  The concept of just transition is broadly defined as ensuring that no one is left behind in
the transition to low-carbon and environmentally sustainable economies and societies.
The Scottish Government’s Just Transition Fund (JTF) represents a significant opportunity
for Moray to position itself to benefit economically and socially from the wider transition to
net zero. Launched in 2021, the JTF is a £500m ten-year commitment to support projects
in the North East and Moray which contribute towards a just transition away from carbon-
intensive industries.  
4.2  The Council has collaborated with partners to develop a multi-year programme of strategic
projects, estimated at £81m, which if fully realised would position Moray to achieve a just
transition. A short list of projects for further development and inclusion in a bid to the JTF
was agreed by Council on 28 January 2026 (para 9 of the Minute refers).  
4.3  In March 2026, the Scottish Government announced the opening of a £10m JTF capital
funding round for the 2026/27 financial year, open to public sector and commercial
applicants. The fund was intended to support larger strategic projects, with a minimum
grant award of £0.5m. The funding round also introduced a limited multi-year funding
provision of up to £5m, to be considered on an exceptional, case-by-case basis.
Applications were required to be submitted by 11 May 2026. 
4.4  A separate £2.5m Community and Social Enterprise Fund was also announced,
comprising £2m capital funding and £0.5m revenue funding. This fund was aimed at
community and social enterprise organisations, with applications expected to be between
£0.1m and £0.5m. Applications for this funding stream were required by 22 May 2026. 
4.5  As agreed by Council on 28 January 2026, authority was delegated to the Executive
Director Economy, Enterprise and Operations to apply to the JTF should the timescales
involved preclude approval through the normal committee cycle. As the application
deadline did not allow sufficient time for Committee consideration, the Executive Director
exercised that delegated authority and the application was submitted to the Scottish
Government on 7 May 2026. 
5.  2026/27 JUST TRANSITION FUND BID DEVELOPMENT  
5.1  Officers engaged regularly with officials from the Scottish Government's Just Transition
team to understand the requirements of the Fund and to ensure that the proposed bid
Page 202

Page 203

aligned with the scope and assessment criteria for the 2026/27 funding round. Throughout
this engagement, Scottish Government officials provided positive feedback on Moray's
overarching Just Transition prospectus and the collaborative approach cultivated by the
Council and its partners, identifying it as an exemplar that had been shared with other
local authorities. Officials also indicated that the proposed programme aligned well with
Just Transition Fund priorities, particularly where it could demonstrate clear links to future
investment, employment and skills. Informal feedback on the Council's shortlisted
projects subsequently informed the development of the final submission. 
5.2  Following consideration of this feedback, the Moray Hydrogen Transport and Moray
Community Solar projects were not included in the 2026/27 application. The Moray
Hydrogen Transport project was excluded with recognition given to evolving Scottish
Government policy in relation to hydrogen and changes to the project's funding position
following the withdrawal of a key funding partner in the wider TH2STLE project in Aberdeen
City and Aberdeenshire council areas. The Moray Community Solar project was not
considered eligible for support through this funding round, as community energy projects
were expected to be supported through alternative funding arrangements, including the
forthcoming GB Energy Communities Fund. Scottish Government officials also highlighted
other potential funding routes to support the project's early development, and Officers
have since provided advice to project partners which enabled them to pursue these
opportunities independently of the JTF at this time. Projects of this nature remain
important to achieving a Just Transition in Moray, and Officers will continue to monitor
both their progress and the wider funding landscape to identify future opportunities for
support and delivery where appropriate. 
5.3  The Natural Capital Enhancement and Skills project was also not included in the 2026/27
application. Whilst Scottish Government officials were supportive of the proposal and
recognised the positive work previously undertaken in the Findhorn catchment, they
advised that the project would be better aligned to the new Just Transition Fund
Community Fund, with community partners leading the application and the Council
providing a supporting role. Officers provided advice to project partners to develop and
progress an application through the Community Fund. At the time of writing, the outcome
of that application had not been announced by the Scottish Government and no indicative
timescale for a decision had been provided. 
5.4  Taking account of this feedback and the available funding envelope for the 2026/27 round,
the proposed bid was therefore refined to focus on a smaller number of projects that
demonstrated the strongest alignment with fund priorities and readiness to progress
within the available timescales. This approach maintained a meaningful contribution to
the Council’s longer-term Just Transition ambitions and wider Corporate Plan and LOIP
priorities, while ensuring that the projects included within the application could deliver
against the requirements and conditions of the funding round. Project elements and sites
were prioritised in line with their maturity, readiness to deliver and eligibility within the
2026/27 financial year.  
5.5  On 30 March 2026, the Corporate Leadership Team (CLT) considered the proposed
approach to the 2026/27 Just Transition Fund application and agreed the outline
programme of projects to be progressed. CLT also agreed that the proposed bid be
presented to the Strategic Leadership Forum (SLF) on 9 April 2026 for further feedback
ahead of finalisation and submission under delegated authority.
Page 203

Page 204

5.6  The funding bid as submitted comprised: 
Project Purpose Scope JTF funding sought 
Buckie Harbour
Redevelopment
enabling works 
(Led by Moray Council)
Build upon earlier JTF
funded master
planning works to
support long-term
expansion of Buckie
Harbour and
strengthen Moray’s
role in the marine and
offshore energy
economy.
Technical feasibility,
design
development to
RIBA Stage 2,
environmental
scoping,
procurement
strategy, cost
planning and initial
Outline Business
Case preparation.
£0.9m
Buildings for the
Future 
(Led by Moray Council)
Enable regeneration
and low carbon
housing delivery
across key brownfield
and town centre sites
in Buckie, Forres and
Elgin.
Site acquisition by
development
partners, design
development and
clearance works at
Barron Street Yard
(Buckie), Former
Auction Hall
(Forres), and St
Giles Centre (Elgin),
including
progression of
redevelopment
options and
supporting master
planning.
£1.8m (£0.5m of which
as multi-year funding
into FY2027/28)
Green Energy Parks 
(Led by Crown Estate
Scotland with Moray
Council as a
supporting partner)
Unlock inward
investment, job
creation and clean
energy opportunities
at key strategic sites.
Feasibility work at
Mosstodloch and
Dallachy Airfield
sites including
resource and
technology
assessments, grid
feasibility, financial
modelling, site
appraisal and
skills/supply chain
analysis.
£0.5m 
Total programme £3.2m 
6.  PROGRESS UPDATE 
6.1  On 8 June 2026, Officers were advised by the Scottish Government that the Council’s
2026/27 Just Transition Fund application had been shortlisted for funding. Following this
notification, Officers worked with Scottish Government officials and their appointed
contractors to complete the required due diligence checks on the application. 
Page 204

Page 205

6.2  During the due diligence process, Scottish Government officials advised that the Council’s
bid would be assessed both as an overall programme and on an individual project basis.
As a result, the proposed match funding arrangements for the Buckie Harbour
Redevelopment project required revision to ensure compliance with the Scottish
Government’s maximum intervention rate of 75% for individual projects. Officers
subsequently engaged with colleagues at Highlands and Islands Enterprise (HIE), who
confirmed the availability of a capital grant of up to £200k from HIE’s income funded
capital budget. This contribution, combined with the Council’s previously agreed match
funding of £183k from Transformation Reserves, would provide the required local
contribution. The total value of the Buckie Harbour Redevelopment project for 2026/27
would therefore be £1.283m. 
6.3  Officers were advised by the Scottish Government on 14 July 2026 that the review of
applications to the Just Transition Fund remained ongoing and that officials were aiming to
complete the process by 4 August 2026. This represented a delay of more than four weeks
against the proposed announcement of successful bids by the end of June 2026. 
6.4  On 4 August 2026, the Scottish Government confirmed that up to £1.2m would be made
available to progress two projects within Moray’s bid, comprising £900k for the Buckie
Harbour Redevelopment project and £300k for the Green Energy Parks project. No funding
was awarded to the Buildings for the Future project, and Officers await feedback on this
decision to inform future bids. 
7.  NEXT STEPS 
7.1  At the time of writing, an inception meeting between Scottish Government, the Council
and its partners was in planning for mid to late August 2026, with a view to commencing
project delivery shortly thereafter, subject to acceptance of grant conditions and
rescoping of the Green Energy Parks project to account for the reduced grant offer. 
7.2  Delivery of 2026/27 JTF projects should ordinarily be completed by 31 March 2027.
However, in recognition of the delay experienced, Scottish Government officials have
confirmed that they would be willing to consider projects continuing beyond the usual
deadline. At the time of writing, Officers are negotiating the terms of such an arrangement
to be included within the Grant Offer Letter. It is not anticipated that the delay in
commencing delivery will impact on the planned project costs. Projects will be managed
to progress delivery as close as practicable to the original deadline, while ensuring that
work delivers on the required outcomes. 
7.3  Concurrent work is required to maintain momentum and to ensure that Moray is well
positioned to maximise future opportunities from the JTF. This includes progressing project
development activity in collaboration with partners and ensuring that projects are
sufficiently mature to advance to the next stages of delivery in the event of a successful
funding award. 
7.4  Since submission of the 2026/27 funding application, Officers have continued discussions
with existing project partners and Highlands and Islands Enterprise (HIE) to establish an
approach for future funding rounds. It is proposed that the Council’s Just Transition
prospectus and overarching vision continue to provide the strategic framework for future
activity, with a focus on progressing the existing pipeline of identified opportunities and
Page 205

Page 206

avoiding the unnecessary development of new proposals where projects already exist
within the Council including within Transform. This approach will, however, retain
sufficient flexibility to respond to significant new opportunities arising through Members,
partners or wider engagement. These would be considered on a case-by-case basis
against the Council’s agreed Just Transition Vision and the availability of appropriate
match funding as required. It is therefore intended that future funding applications
continue to support projects identified within the 2026/27 bid, either through securing
initial enabling investment to progress development activity or by supporting subsequent
phases of delivery as projects mature, while also allowing emerging opportunities of
strategic significance to be brought forward where appropriate. 
7.5  Officers have been advised informally by Scottish Government colleagues that there may
be a review of the Just Transition Fund during the 2027/28 financial year. This process
would be welcome, reflecting previous engagement between the Council, the Cabinet
Secretary and Scottish Government officials regarding the scope, accessibility and role of
the JTF in supporting just transition activity locally. While no formal announcement or
details of any future changes have been confirmed, it is recommended that the Council
engages proactively with the Scottish Government in advance of any future funding
changes. This would ensure that Moray’s priorities and the needs previously highlighted to
the Scottish Government are considered in any future iteration of the Fund. 
7.6  It is therefore proposed that the Council Leader and Officers continue to engage with
Scottish Government officials, parliamentarians and wider partners to promote Moray’s
Just Transition programme and to advocate for the investment required to support a just
transition. 
7.7  Officers will report back to Council at the earliest opportunity once further substantive
updates are available. 
8.  SUMMARY OF IMPLICATIONS  
8.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal X 
Financial X 
Risk X 
Staffing X 
Best Value and Transformation X 
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact            X 
Climate Change and Biodiversity Impact           X 
8.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Page 206

Page 207

Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in  Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
8.3  Policy and Legal 
Promoting a Just Transition for Moray will allow the Council to progress climate change
projects in Moray. The Climate Change (Scotland) Act 2009 places a duty on public bodies
to act in the way best calculated to contribute to the delivery of Scotland’s climate change
targets; in the way best calculated to help deliver any programme for climate change
adaptation laid before the Scottish Parliament; in a way it considers most sustainable.  
8.4  Financial 
The Just Transition Fund is paid out in arrears and therefore could create cashflow
implications which would be managed as part of Treasury Management activity. 
8.5  Risk 
Without agreement of next steps, there is a risk that the Council and Moray may miss the
opportunity to fully benefit from any funding available.  
8.6  Staffing 
Additional resourcing was agreed by the Council on 25 February 2025 for a Grade 11
Senior Project Officer to be employed for a 2-year period to lead on project development
for the Just Transition Fund. Project development to date has relied on input from Officers
across Strategic Planning and Development, Transportation, Harbours, Legal and Finance,
and continued cross-service support will be required as work progresses towards bid
submission. Provision of dedicated PMO funding and associated support service costs
would be sought from the Just Transition Fund as part of any funding bid to ensure that
projects can be managed and progressed.  
8.7  Best Value and Transformation 
Contributing to the achievement of sustainable development through continuous
improvement in performance is a key component of the Council’s Best Value duties set
out by the Local Government in Scotland Act 2003. Achieving sustainable development
means meeting the needs of the present without compromising the ability of future
generations to meet their own needs. The Scottish Government’s Just Transition Fund
provides an opportunity to progress sustainable development projects.
Page 207

Page 208

8.8  Property 
There are no implications arising from this report.  
8.9  Information Communications/Technology/Digital 
There are no implications arising from this report.  
8.10  Equalities, Social Inclusion and Economic Impact   
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ✓ ☐ ☐
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
The Buckie Harbour Redevelopment proposal in particular would be expected to have a
positive socio-economic impact on the Buckie area which has pockets of high deprivation
(SIMD) via job creation and retention. However, the projects planned as part of the
2026/27 Just Transition Programme are early stage enabling works which are unlikely to
have an impact on any groups in isolation. 
8.11  Climate Change and Biodiversity Impacts 
The Scottish Government’s Just Transition Fund will support projects which contribute
towards the transition to net zero. Therefore, any project developed as recommended in
this report will contribute positively to climate change and biodiversity. 
9.  CONSULTATION   
This report has been prepared in consultation with the Chief Executive; Executive Director
Economy, Enterprise and Operations; Head of Growth, Planning and Climate; Head of
Page 208

Page 209

Operations and Environment;  Head of Housing, Property and Communities; Chief
Financial Officer; Service Manager Strategic Planning and Development; Principal
Planning Officer (R MacDougall); Climate Change Strategy Officer (T Maas Geesteranus);
Community Wealth Building Officer; Service Manager Legal Services and Service Manager
Democratic Services.   
10.  BACKGROUND PAPERS       
Page 209

Page 210

Page 210

Page 211

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Martin Skinner Contact Email: martin.skinner@moray.gov.uk  
Subject: Regeneration Capital Grant Fund 2027/28 Additional Applications 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  This report seeks homologation of the action taken by the Chief Executive (under
paragraph 5 (7) of the Scheme of Delegation) authorising Moray Council to act as lead
applicant for two additional Stage 1 applications to the Regeneration Capital Grant Fund
(RCGF) 2027/28, namely: 
• the Moray Athletics Hub; and
• Works relative to the St Giles Shopping Centre area in Elgin.  
1.2  This report is submitted to Council in terms of Section III (F) (29) of the Council’s Scheme
of Administration relating to application for, co-ordination and monitoring of Council
funding from European legacy and external programmes.  
2.  SUMMARY  
2.1  This report seeks homologation of the Corporate Leadership Team decision for Moray
Council to act as lead applicant for two additional Stage 1 applications to the
Regeneration Capital Grant Fund (RCGF) 2027/28: the Moray Athletics Hub and works
relative to the St Giles Shopping Centre area, Elgin.  
2.2  The Moray Athletics Hub proposal came forward in response to the official opening of the
RCGF Round 13, which was announced after ED&I committee approval of submission of
two community-led RCGF Stage 1 applications.  The St Giles Centre area works came
forward due to a change of circumstances and failure to attract an alternative funding
source.  Submission of the additional Stage 1 applications enables the proposals to be
considered through the RCGF assessment process and does not commit the Council to
project delivery, match funding or any other direct financial contribution.  Should either
proposal be invited to progress to Stage 2, the financial, legal, property, staffing, risk and
governance implications would require further consideration before any subsequent
application is submitted. Equally, should either not be supported, the applications will be
withdrawn, having been submitted subject to this caveat.
Item 12.
Page 211

Page 212

3.  RECOMMENDATIONS  
3.1  It is recommended that Council:   
i)  homologates the action taken by the Chief Executive (under paragraph 5 (7) of
the Scheme of Delegation) authorising Moray Council to act as lead applicant
for two additional Stage 1 applications to the Regeneration Capital Grant
Fund (RCGF) 2027/28, namely the Moray Athletics Hub and the St Giles
Shopping Centre area; and   
ii)  notes that submission of the Stage 1 applications does not commit the
Council to project delivery, match funding or any other direct financial
contribution, and that: 
1. should the proposals not be supported by Council, they can be
withdrawn as they were submitted with that caveat
2. if the proposals are invited to progress to Stage 2, the financial, legal,
property, staffing, risk and governance implications will be subject to
further consideration and approval through the appropriate Council
governance process before any subsequent Stage 2 application is
submitted   
Author Name: Martin Skinner
Job Title: Development Officer 
4.  BACKGROUND AND CONTEXT  
4.1  At its meeting on 16 June 2026, the Economic Development and Infrastructure Services
Committee approved Moray Council acting as lead applicant for two RCGF 2027/28 Stage
1 community proposals: the Dufftown Clock Tower project and the Leanchoil Hospital
Regeneration Project. The Committee also approved progression to Stage 2, if invited,
subject to adequate staffing resources (para 3.1 i) of the minute refers).  
4.2  On 2 July 2026, the Scottish Government formally opened the Regeneration Capital Grant
Fund (RCGF) for Stage 1 Expressions of Interest for 2027/28. Applications were open to
local authorities, with a submission deadline of 5pm on 14 August 2026.  
4.3  Following publication of the funding call and a change in circumstances, two additional
proposals were subsequently brought forward and were considered to align with the aims
and objectives of the fund. These were the Moray Athletics Hub, involving development of
a new community athletics facility at Moray Sports Centre, Elgin, and works relative to the
St Giles Shopping Centre area.  The St Giles Shopping Centre area works were anticipated
to receive support through an alternative funding stream. However, notification that the
bid had been unsuccessful was received after the earlier committee report had been
prepared. Had the outcome been known at that time, the proposal would also have been
included in that report.  
4.4  Due to the Stage 1 submission deadline of 14 August 2026 and the timing of the Council's
committee cycle, there was insufficient opportunity to seek approval for the two additional
applications through the normal committee process. The Corporate Leadership Team, at
Page 212

Page 213

its meeting on 6 August 2026, therefore agreed that the applications could be submitted,
subject to subsequent homologation by Moray Council and that arrangements would be
put in place to avoid a similar situation arising in future funding rounds.  
4.5  Moray Council is therefore asked to homologate the Corporate Leadership Team decision. 
5.  PROPOSALS  
5.1  The Corporate Leadership Team agreed that Moray Council could act as lead applicant for
two additional Stage 1 applications to the Regeneration Capital Grant Fund (RCGF)
2027/28.  
5.2  The two additional proposals submitted are: 
• Moray Athletics Hub – development of a new community athletics facility at Moray
Sports Centre, Elgin.  This project is led by Elgin Neighbourhood Board.
• Works relative to the St Giles Shopping Centre area  - This project already has
committee approval for submission, but as part of an alternative funding bid. 
Brief project summaries for the two additional applications are provided in Appendix 1A
and 1B.  
5.3  Submission of the Stage 1 applications does not commit the Council to project delivery,
match funding or any other direct financial contribution. Should either proposal be invited
to progress to Stage 2, further consideration will be required of the financial, legal,
property, staffing, risk and governance implications before any subsequent application is
submitted.  It is expected that neither of the additional projects will add materially to the
workload of the Economy and Enterprise Team.  
5.4  In accordance with RCGF guidance, where multiple applications are submitted, Local
Authorities are requested to prioritise the applications. The combined RCGF request
across the four Moray proposals is £4.75 million and if more than one project is invited to
progress to Stage 2, a prioritisation exercise will be carried out. Should the additional
proposals not be supported by council, they can be withdrawn as they were submitted
with that caveat.  If the proposals are invited to progress to Stage 2, the financial, legal,
property, staffing, risk and governance implications will be subject to further consideration
and approval through the appropriate Council governance process before any subsequent
Stage 2 applications are submitted. 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ☒ ☐
Policy and Legal ☐ ☒
Financial ☒ ☐
Risk ☒ ☐
Page 213

Page 214

Staffing ☒ ☐
Best Value and Transformation ☒ ☐
Property ☒ ☐
Information Communications Technology/Digital ☐ ☒
Equalities. Social Inclusion and Economic Impact  ☒ ☐
Climate Change and Biodiversity Impact ☒ ☐ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
6.3  Policy and Legal 
There are no immediate legal implications arising from submission of the Stage 1
applications. However, as lead applicant, the Council would be responsible for ensuring
compliance with the terms and conditions of any RCGF award.   
Should either proposal progress to Stage 2, Legal Services will be consulted regarding any
funding agreements, partnership arrangements, property interests and other legal
obligations arising from the proposed delivery arrangements.  
6.4  Financial 
There are no direct financial implications arising from submission of the Stage 1
applications and submission does not commit the Council to provide match funding or
any other direct financial contribution.   
However, as lead applicant, the Council may be exposed to financial risk should an
application ultimately be successful and grant conditions not be met, or where project
promoters are unable to fulfil their obligations. These risks would be considered further
through project appraisal and appropriate governance arrangements prior to any Stage 2
submission.   
Further assessment of the financial implications, including the proposed funding
package and status of match funding, will be undertaken should any of the projects
progress to Stage 2.
Page 214

Page 215

The total request for RCGF funding in 2027/28 across the four proposals is £4,746,560. 
Match funding figures represent the balance of anticipated project costs and do not
represent a commitment by Moray Council to provide the funding.
Project Total Project Cost RCGF request 27/28 Indicative Match
Funding
Requirement
Leanchoil
Hospital
Regeneration
Project
£7,382,192 £2,500,000 £4,882,192 
Dufftown Clock
Tower
£886,261 £614,247 £272,014 
Moray Athletics
Hub
£2,198,776 £632,313 £1,566,463
St Giles Centre
Area
£38,274,010 £1,000,000 £3,960,000
TOTAL £48,741,239 £4,746,560 £10,320,669 
6.5  Risk 
Submission of the RCGF applications carries a number of risks, including funding
uncertainty, the availability of match funding, project delivery challenges, changes to
programme timescales and the ability of project promoters to meet funder requirements
and conditions. There is also a risk that projects may not progress to Stage 2 or ultimately
be successful in securing funding.   
As lead applicant, the Council may be exposed to financial, compliance and reputational
risk should grant conditions not be met or projects be unable to proceed as proposed.
Should either project progress to Stage 2, these risks will be subject to further assessment
and mitigated through appropriate project appraisal, governance, monitoring and, where
required, agreements setting out the respective responsibilities of the Council and project
promoters.   
Officer capacity to support application development, project monitoring and funding
compliance will also be reviewed before any Stage 2 application is submitted.  
6.6  Staffing 
Administration and reporting for external funding programmes is undertaken by the
Economy and Enterprise Team. Submission of the Stage 1 applications has been
accommodated within existing resources.   
Should either of the additional proposals be invited to progress to Stage 2, additional
officer input may be required to support application development, project appraisal,
monitoring, claims management and compliance with funder requirements.  However,
Strategic Planning & Development will be responsible for the St Giles proposal and the
lead for the Elgin Neighbourhood Board project is experienced in project management and
funding.  Resource requirements from the Economy and Enterprise Team are therefore
Page 215

Page 216

expected to be minimal for these two applications but will be reviewed before any Stage 2
application is submitted to ensure sufficient capacity is available alongside management
of the Council's wider external funding programmes.   
Project promoters will be responsible for ensuring that appropriate project management,
governance and delivery arrangements are in place. The extent of Council support
required will be determined as part of any future Stage 2 application process.  
6.7  Best Value and Transformation 
The use of external grant funding can support Best Value by enabling investment in
regeneration and community infrastructure which may not otherwise be deliverable from
existing Council resources alone.   
Effective use of external funding requires appropriate project appraisal, governance,
monitoring and reporting to ensure funding is used in accordance with grant conditions
and intended outcomes are achieved.   
Should either proposal progress to Stage 2, consideration will be given to project
deliverability, the proposed funding package, Council resource requirements and the
respective responsibilities of the Council and project promoters to ensure that any
subsequent application represents an appropriate use of Council resources.  
6.8  Property 
The St Giles Shopping Centre area full proposal is as set out in the confidential report also
on this agenda. Submission of the Stage 1 application does not commit the Council to any
works, expenditure, or other activity. Should the project progress beyond Stage 1, any
property, operational, financial and legal implications associated with the Council-owned
asset would be subject to further assessment and approval through the appropriate
Council governance process.  
6.9  Information Communications/Technology/Digital 
There are no information communications technology or digital implications arising
directly from this report.  
6.10  Equalities, Social Inclusion and Economic Impact  
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ✓ ☐ ☐
Page 216

Page 217

Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ✓ ☐ ☐
Human Rights of individuals ☐ ☐ ✓ ☐ ☐
Rights of Children or Young People
(UNCRC)
☐ ☐ ✓ ☐ ☐
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
The decision to submit Stage 1 applications is not expected to have an immediate
differential impact on individuals or groups with protected characteristics, socio-
economically disadvantaged groups, human rights or the rights of children and young
people.  However, both proposals have the potential to deliver positive outcomes if
progressed, particularly through improved accessibility, regeneration, connectivity and
access to services and opportunities. 
RCGF supports projects which seek to address deprivation, disadvantage and community
regeneration. At this early stage, it is anticipated that both proposals could have positive
impacts across the groups identified above.    As project scope, design and delivery
arrangements are further developed, opportunities to maximise, evidence and monitor
positive outcomes for these groups will be identified and incorporated where appropriate. 
Any project-specific equalities, socio-economic, human rights or children's rights
implications will be considered further through an integrated impact assessment should
either proposal progress to Stage 2.  
6.11  Climate Change and Biodiversity Impacts 
Projects seeking support through RCGF are required to demonstrate consideration of
climate change impacts and their contribution towards achieving Scotland's net-zero
emissions target by 2045.   
Submission of the Stage 1 applications does not itself authorise any development or
physical works. Should either proposal progress to Stage 2, relevant climate change,
carbon and biodiversity implications will be considered as part of further project
development and assessment.   
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Executive Director Finance, Strategy & Transformation, Head of Growth,
Chief Financial Officer, Planning and Climate (Chief Planning Officer); Service Manager,
Property, Estates and Assets, Service Manager, Internal Audit and Risk, Service Manager,
Legal Services, Chief Governance Officer, Service Manager Economy and Enterprise,
Service Manager Strategic Planning and Development, Senior Equalities Officer, Senior
Project Manager – Housing Mix Delivery, and Service Manager Democratic Services and
any comments made have been incorporated into the report.  
8.  BACKGROUND PAPERS
Page 217

Page 218

8.1  ED&I Committee report on External Grant Funding Updates 16 June 2026 (Item 8)  
Page 218

Page 219

Appendix 1A - Moray Athletics Hub 
Project Summary
The Moray Athletics Hub is an Elgin Neighbourhood Board supported project that seeks
to develop a new six-lane athletics track with complementary field event facilities at
Moray Sports Centre, Linkwood Road, Elgin. The facility would be developed on
approximately two hectares of vacant land adjacent to Moray Sports Centre and would
operate as a community-owned athletics facility serving Moray. 
Project Need
Moray is one of only two local authority areas in Scotland without access to a synthetic
competition-standard athletics track. The Scottish Athletics Facilities Strategy 2022
identified Moray as a priority area for investment due to the limited athletics
infrastructure available locally. 
The existing athletics facility at Morriston Playing Fields no longer meets modern
requirements and is constrained by its location within a flood plain. The proposed
facility would improve opportunities for participation, coaching, competition and
athlete development across Moray. 
Expected Outcomes
The project aims to:
• Increase participation in athletics and physical activity.
• Improve health and wellbeing outcomes.
• Create opportunities for coaching, volunteering and skills development.
• Support talent development and competitive athletics.
• Provide a community-owned sports facility for Moray.
• Support wider economic, social and environmental benefits. 
Funding Summary
Item Value
Total Project Cost £2,198,776
RCGF Request £632,313
Match Funding £1,566,463 
Page 219

Page 220

Confirmed match funding includes £1,000,000 from the Elgin Pride in Place Programme,
with additional funding being sought from the Scottish Athletics Sports Facility Fund.
Delivery Partners
The project will be delivered in partnership by Moray Athletics and Running Community
Hub (MARCH) and Moray Sports Foundation. Moray Sports Foundation would own and
operate the facility.  
Page 220

Page 221

Appendix 1B – Works relative to St Giles Shopping Centre Area 
Project Summary
The St Giles Shopping Centre area works are set out in the confidential report at Item (to
be added) on the agenda. 
Page 221

Page 222

Page 222

Page 223

Report to: Moray Council  Meeting Date: 30 September 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Stevie Robertson Contact
Email:
Stevie.robertson@moray.gov.uk 
Subject: Bus Revolution Strategic Approach and Revenue Budget Phase 3 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to seek approval for the revised strategic approach for Bus
Revolution Phase 3 and the associated revenue budget and financial profile required to
support its delivery.  
1.2  This report is submitted to Council in terms of Section III (F) (18) of the Council’s Scheme
of Administration relating to exercising the function of the Council in relation to public
passenger transport under the Transport Act 1985.  
2.  SUMMARY  
2.1  Bus Revolution comprises of five delivery phases and is currently operating within Phase 2,
with Phase 3 scheduled to commence on 1 April 2027. The original project business case
anticipated service growth and network expansion throughout each phase of delivery. 
2.2  Following a review of programme priorities, the Bus Revolution Project Board approved a
revision to the aims and objectives of Phase 3. Rather than focusing on further service
expansion, Phase 3 will concentrate on the development of data and analytical tools to
support improved service evaluation and network planning, service refinements based on
operational evidence, and internal process improvements. This phase will establish the
foundations required to support future network expansion within Phases 4 and 5. 
2.3  Approval is sought for the revised Phase 3 delivery approach and associated financial
profile, which aligns available resources with the updated programme objectives whilst
maintaining the existing Council subsidy commitment.  
2.4  While no service expansion is proposed within Phase 3, opportunities for future growth
continue to be explored. Subject to business case development and funding availability,
an aspiration remains to expand Service 314 within Forres during financial year 2028/29.
Any additional expenditure associated with future service enhancements will be subject to
Item 13.
Page 223

Page 224

separate approval processes and funded through appropriate external or internal funding
mechanisms, including potential Transport to Employment and Brighter Starts funding
opportunities. 
2.5  Approval of the revised Phase 3 delivery approach and associated revenue budget will
ensure that resources remain aligned with approved project objectives, maintain existing
service provision and establish the evidence base required to support future phases of
network expansion.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Council:   
i)  consider and note the contents of this report;   
ii)  approve the revised aims and objectives for Bus Revolution Phase 3, focusing
on data and analytical tool development, service optimisation, performance
evaluation, process improvement and the development of the evidence base
required to support future network expansion.;   
iii)  note that no service expansion is proposed within Phase 3 and that the
revised financial profile has been developed using actual operating costs,
passenger demand and income performance achieved through Phases 1 and
2;; 
iv)  note the revised Phase 3 revenue requirement and associated financial
profile for financial years 2027/28 and 2028/29, noting that delivery is
expected to be achieved within existing budget; and 
v)  note that future service expansion proposals and associated revenue
requirements for Phases 4 and 5 will be informed by the evidence, analysis
and business cases developed during Phase 3 and will be subject to separate
Committee approval and funding decisions.   
Stevie Robertson
Senior Project Officer (Bus Revolution) 
4.  BACKGROUND AND CONTEXT  
4.1  The Bus Revolution project forms part of the Moray Growth Deal and seeks to improve
public transport connectivity across Moray through the development of demand
responsive and timetabled bus services, the introduction of digital technology solutions,
and investment in electric vehicles and supporting infrastructure. The project is supported
through a ten-year funding profile and is structured around five delivery phases. 
4.2  The original Full Business Case assumed that each phase of delivery would introduce
additional service capacity and network expansion, supported through the phased
introduction of vehicles, staff resources and associated infrastructure. The long-term
ambition remains to improve access to employment, education, health and leisure
opportunities whilst increasing public transport patronage across Moray.
Page 224

Page 225

4.3  Phase 1 commenced in May 2023 and delivered enhanced operating hours for demand
responsive transport services, the introduction of new timetabled services, app-based
booking technology and the deployment of low-emission vehicles. Phase 2, approved by
Council in September 2024, focused on further service expansion, network redesign and
the introduction of additional services in response to evidenced demand and community
engagement activity. 
4.4  Performance monitoring undertaken during Phases 1 and 2 demonstrates that the project
is exceeding key growth targets. Passenger journeys increased from a baseline of 45,881
journeys in 2022/23 to 85,309 journeys in 2025/26, exceeding the trajectory required to
achieve the project's 2030 target. Significant progress has also been made in relation to
modal shift, accessibility and environmental objectives. 
4.5  Whilst positive progress has been achieved in growing service provision and passenger
numbers, project delivery has also highlighted the importance of developing more
sophisticated data, analytical and evaluation tools to support future decision making.
Monitoring activity undertaken has identified opportunities to strengthen service planning,
resource allocation, demand forecasting, accessibility analysis and the measurement of
wider economic and social outcomes associated with public transport investment. 
4.6  The change in approach does not reflect a requirement to reduce expenditure or service
provision. Rather, it reflects a strategic decision to prioritise the development of evidence,
analytical capability and network intelligence before considering further expansion. The
revised Phase 3 approach does not reflect concerns regarding network performance,
passenger demand or financial sustainability. Rather, it reflects a strategic decision to
consolidate the growth achieved through Phases 1 and 2 and develop the evidence base
required to support future expansion. 
4.7  As a result of this learning, the Bus Revolution Project Board reviewed the project
objectives for Phase 3. Rather than focusing on further service expansion from 1 April
2027, Phase 3 will focus on: 
• Development of data and analytical tools to improve network evaluation and
planning;
• Enhanced monitoring of project benefits and outcomes;
• Service refinements and optimisation based on operational evidence;
• Promoting further growth in existing services
• Process improvements to improve efficiency and effectiveness; and
• Establishing the foundations required to support future network expansion during
Phases 4 and 5. 
4.8  This revised approach will enable the project to make greater use of emerging datasets,
including passenger demand information, booking platform analytics, mobility data and
service performance information, ensuring future investment decisions are informed by
robust evidence and aligned to project objectives. The approach will also support the
development of mechanisms to better evidence progress against outcomes relating to
access to employment, education and recreation. 
Page 225

Page 226

4.9  As a consequence of the approved change in direction, the expenditure and income
assumptions contained within the current Phase 3 financial model are no longer
representative of the activities proposed for delivery. The existing financial profile
assumed continued service growth and associated increases in operational costs and fare
income. Delivery of the revised Phase 3 objectives requires a revised revenue profile
reflecting the emphasis on analysis, evaluation, optimisation and business development
activities whilst maintaining the existing Council subsidy commitment.  
4.10  Although no service expansion is currently proposed within Phase 3, the project continues
to identify opportunities for future growth aligned to evidenced need and available
funding. Subject to business case development and funding availability, there is an
aspiration to expand Service 314 within the Forres area during financial year 2028/29. 
4.11  Any future service expansion proposals arising during Phase 3 or subsequent phases will
be subject to separate approval processes and, where appropriate, will seek financial
support through alternative funding opportunities, including Transport to Employment,
Brighter Starts and other external funding mechanisms. 
4.12  Approval of the revised Phase 3 revenue budget will ensure resources remain aligned with
the objectives approved by the Project Board, whilst maintaining delivery of the Bus
Revolution programme and supporting the successful transition into future phases of
network development.  
5.  PROPOSALS  
5.1  Following approval by the Bus Revolution Project Board of a revised strategic focus for
Phase 3, the project team will amend the associated financial profile which supports
delivery of that approach via the Growth Deal Programme Board. The revised profile
maintains the existing annual Council subsidy contribution of £686,435 whilst aligning
expenditure and income assumptions with a phase focused on analysis, evaluation,
optimisation and future business case development rather than network expansion. No
additional Council funding is required to deliver the Phase 3 programme..  
5.2  Whilst the net subsidy fluctuated during FY2025/26, it was managed through underspends
elsewhere within the Public Transport budget and did not require any additional Council
funding. The variance was primarily attributable to fuel market pressures, increased
staffing costs associated with project delivery and operational support functions, and
income levels maturing more slowly than originally forecast. In addition, whilst some
Phase 2 service developments were introduced later than originally assumed, the
financial benefits that might otherwise have been realised from delayed implementation
were offset by these increased operating costs.  
5.3  Despite the fluctuation in subsidy, passenger growth and revenue performance continued
to improve throughout FY2025/26. Passenger journeys increased to 85,309, representing
growth of 13.2% compared with FY2024/25 and growth of 86% since project
commencement. Farebox income increased to £264,346, more than doubling compared
with FY2022/23 and demonstrating continued growth in public use of the network.  
5.4  Current operational and financial performance provides increased confidence that the
subsidy position of £686,435 approved by Council remains sufficient to support delivery of
Page 226

Page 227

the current m.connect network. During the first four months of FY2026/27, passenger
journeys increased by 17% compared with the same period in FY2025/26, whilst farebox
income increased by 22.6%. Revenue performance is currently tracking at approximately
98% of the levels assumed within the original financial model and, if current trends
continue, annual farebox income is forecast to exceed £360,000 per annum, representing
continued year-on-year growth and aligning closely with the assumptions contained within
the Phase 3 budget.  
5.5  The introduction of the Scottish Government's £2 fare cap in March 2026 has been a
contributing factor in this improved performance. The scheme has increased affordability,
encouraged greater use of m.connect services and improved cash fare uptake. Early
evidence therefore suggests that the £2 fare cap is contributing positively to both
passenger growth and network income performance.  
5.6  The Council's investment continues to provide a high level of public transport provision for
a relatively modest level of subsidy when considered against the scale, geographic
coverage and operational hours of the network delivered. For approximately £686,000 of
annual subsidy, Moray receives an authority-wide public transport network providing
Demand Responsive Transport services across Moray Monday to Friday between
approximately 0600 and 2030, dedicated weekend Demand Responsive Transport
services serving Buckie, Speyside and Forres, and timetabled services that bridge
connectivity gaps, improve service frequency and provide additional capacity on key
corridors. The network supports access to employment, education, healthcare, retail and
social opportunities across both urban and rural communities and is expected to facilitate
in excess of 100,000 passenger journeys annually as the network continues to mature.  
5.7  In addition to the direct transport benefits delivered, m.connect generates wider social
and economic value through reduced social isolation, improved access to essential
services, support for employment and training opportunities, and enhanced connectivity
for rural communities. These outcomes contribute directly towards the Council's wider
economic, environmental and community wellbeing objectives and represent benefits
that extend beyond the direct operation of public transport services.  
5.8  The proposed Phase 3 budget reflects the approved strategic decision that no significant
network expansion will take place during the period and instead focuses on maintaining
existing service provision whilst delivering the analytical, evaluation and optimisation
activities approved by the Project Board.  
5.9  Under the proposed approach, annual operating expenditure for FY2027/28 is forecast at
£1.160m. Total income is forecast at £473,284, comprising farebox income, Network
Support Grant, developer contributions and other secured or anticipated external funding
sources. This results in a retention of the existing subsidy level of £686,435. This is
forecast despite inflationary increases in operating costs and reflects continued growth in
passenger demand, network utilisation and income generation.  
5.10  The proposed position provides confidence that an increasingly sustainable operating
model, based on demonstrated passenger demand, improving revenue performance and
controlled expenditure growth, can be delivered within the current approved subsidy level.
Any future service enhancements or expansion opportunities identified through Phase 3
will be expected to secure external funding support wherever practicable, including
Page 227

Page 228

Transport to Employment funding, developer contributions and other third-party funding
opportunities, thereby protecting the Council's core subsidy position.  
5.11  As a result, the proposed Phase 3 approach presents a realistic and evidence-led financial
profile which supports the revised strategic objectives for Phase 3. Annual operating costs
are forecast at £1.160m, with forecast income of £473,248, maintaining the existing
Council subsidy position of £686,435 whilst sustaining current service provision and
supporting preparation for future phases of network expansion.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  X
Financial X 
Risk X 
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital             X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
The revised Phase 3 proposals support the strategic objectives of the Moray Growth Deal,
Moray Council's Corporate Plan and wider Scottish Government transport priorities
relating to sustainable, accessible and integrated public transport. The focus on data-led
Page 228

Page 229

decision making, service optimisation and evidence-based planning will strengthen the
Council's ability to deliver efficient and effective transport services that support access to
employment, education, healthcare and community facilities across Moray. 
The proposals do not introduce any changes to the Council's existing public transport
services, fare structures, passenger eligibility arrangements or operating permissions. Bus
services operated by the Council will continue to be delivered in accordance with the
statutory and regulatory framework governing local bus services, including registrations
with the Traffic Commissioner and the requirements associated with Section 19 and
Section 22 permits where applicable. 
There are no specific legal implications arising from the proposed revision to the Phase 3
revenue budget. The proposal represents a change in project priorities and financial
assumptions rather than a change in service provision. The revised approach will support
compliance with the Council's Best Value duties by ensuring future transport investment
and service development decisions are informed by robust evidence, performance
monitoring and analysis.  
6.4  Financial 
The principal purpose of the revised financial profile is to align the approved Phase 3
strategic approach with the associated expenditure and income assumptions whilst
maintaining the current approved subsidy position. The financial implications associated
with this report relate to the approval of the revised Bus Revolution Phase 3 revenue
budget and associated financial profile for FY2027/28 and FY2028/29.
The proposed budget has been developed using actual operating costs, observed
passenger demand and evidenced income performance achieved through delivery of the
m.connect network. The budget therefore reflects current operating conditions and
demonstrated performance rather than relying solely upon assumptions contained within
the original Business Case. 
Whilst the net subsidy requirement fluctuated during FY2025/26, this was
accommodated through underspends elsewhere within the Public Transport budget and
did not require any additional Council funding. Current financial monitoring
demonstrates continued growth in both passenger demand and farebox income and
provides increased confidence that the financial assumptions underpinning the original
Business Case remain achievable. 
The proposed Phase 3 financial profile has been based upon maintaining the existing
m.connect network and supporting infrastructure, with a 3.5% inflationary allowance
applied to operational and contractual costs. This results in forecast annual operating
expenditure of £1.160m during FY2027/28. 
Total income is forecast at £473,248, comprising farebox income and Network Support
Grant income generated from both the legacy and project elements of the network.
Based on these assumptions, the forecast subsidy requirement is £686,435. 
The proposed financial position is therefore considered affordable, evidence-based and
sustainable whilst maintaining existing service provision throughout the Phase 3 period 
Page 229

Page 230

One off Costs: There are no additional one-off costs associated with this proposal. The
revised revenue budget will be delivered within existing approved Bus Revolution and
Moray Growth Deal funding arrangements. 
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual Net
Impact
Virement
From (if
applicable)
Other
Comments
Public
Transport 
TL Rev -
Existing
approved
revenue
budget
1 April
2027
Reduction
in forecast
expenditure
and
associated
income
compared
with the
current
approved
financial
model
N/A Revised
revenue
profile
aligns with
approved
Phase 3
objectives
and
maintains
the current
subsidy
position of
the
network.
Full details
are
provided in
appendix
1. 
6.5  Risk 
The principal financial risk associated with Phase 3 is that passenger growth and income
generation do not continue at the levels currently being experienced across the network.
This could increase the net subsidy requirement and place pressure on future budget
assumptions. 
Whilst income performance during FY2025/26 was below that assumed within the original
financial model, passenger demand and farebox income continued to demonstrate strong
year-on-year growth. During the first four periods of FY2026/27, passenger journeys
increased by 17% and farebox income increased by 22.6% compared with the same
period in the previous year. Accordingly, the Phase 3 income forecasts have been based
upon demonstrated operational performance and evidenced growth trends rather than
assumptions associated with future network expansion. 
A key external risk relates to the future of the Scottish Government £2 fare cap scheme.
Current evidence suggests that the scheme has contributed positively to passenger
growth and farebox income performance by improving affordability whilst maintaining
operator income through reimbursement arrangements. Withdrawal or significant
Page 230

Page 231

amendment of the scheme could reduce passenger demand and adversely affect income
growth assumptions contained within the Phase 3 budget. 
Additional risks include:
• Passenger growth moderating as the network reaches operational maturity.
• Inflationary pressures affecting fuel, maintenance, staffing and contracted service 
costs.
• Changes to national concessionary travel reimbursement arrangements or 
transport funding mechanisms.
• Service disruption arising from vehicle availability, staffing pressures, severe 
weather events or wider network issues.
• Wider economic conditions impacting discretionary travel demand. 
These risks will continue to be monitored through routine financial monitoring, contract
management, performance reporting and Project Board oversight. 
The revised Phase 3 approach reduces a number of risks associated with introducing
further service expansion before sufficient operational evidence and analytical capability
are available to support future investment decisions. The approach therefore provides a
more robust and evidence-led basis for future planning while maintaining current network
provision within the approved subsidy envelope.  
6.6  Staffing 
There are no staffing implications as a result of this report.  
6.7  Best Value and Transformation 
The revised Phase 3 approach supports the Council's commitment to Best Value by
focusing on the optimisation of existing services, maximising the value derived from
assets and resources already introduced through Phases 1 and 2, and ensuring future
investment decisions are informed by robust evidence and performance data. The
development of enhanced analytical tools, performance monitoring frameworks and
service evaluation processes will improve the Council's ability to target resources
effectively, identify efficiencies and maximise the social, economic and environmental
benefits generated through Bus Revolution investment. 
The proposals are also transformational in nature, shifting the programme from a phase of
network expansion to one focused on data-driven decision making, continuous
improvement and long-term sustainability. The investment in business intelligence,
demand analysis and service optimisation capabilities will strengthen future network
planning, support more efficient service delivery and establish the evidence base required
to support future expansion opportunities within Phases 4 and 5 whilst minimising
financial risk.  
6.8  Property 
There are no property implications as a result of this report.  
6.9  Information Communications/Technology/Digital 
There are no Information Communications/Technology/Digital implications as a result of
this report.  
Page 231

Page 232

6.10  Equalities, Social Inclusion and Economic Impact
An Integrated Impact Assessment has been completed and is included as Appendix 2 to
this report. The proposals do not introduce any reductions to existing service provision,
accessibility arrangements, passenger eligibility criteria or fare structures and therefore no
direct adverse impacts have been identified for protected groups, socio-economic
disadvantaged communities, rural communities or island communities. 
The assessment has, however, recognised the potential for indirect or delayed impacts
arising from the decision not to progress Phase 3 service expansion as originally envisaged
within the Business Case. These impacts could affect communities and individuals
experiencing unmet transport needs, including people living in rural areas, disabled
people, older people, young people, unpaid carers and those experiencing socio-
economic disadvantage. 
These potential impacts are mitigated through the Phase 3 focus on evidence gathering,
enhanced performance monitoring, accessibility analysis and targeted engagement
activities, which will inform future service development and investment decisions during
Phases 4 and 5. The revised approach is intended to ensure that future expansion
proposals are based on robust evidence of need and deliver the greatest benefit to
communities across Moray.  
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
✓ ☐ ☐ ✓ ☐
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
✓ ☐ ☐ ✓ ☐
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
The Bus Revolution project seeks to reduce inequalities by improving access to affordable
and accessible public transport, particularly for people living in rural communities, older
people, disabled people, young people, unpaid carers and individuals who face transport
barriers to employment, education, healthcare and essential services. The revised Phase
3 approach will support these objectives through the development of enhanced data,
analytical and evaluation tools, enabling the Council to better understand travel needs,
Page 232

Page 233

identify gaps in provision and target future investment where it can deliver the greatest
social benefit. 
The proposal does not reduce existing service provision, accessibility arrangements,
passenger eligibility criteria or fare structures and therefore no direct adverse impacts
have been identified for protected groups or those experiencing socio-economic
disadvantage. Existing passengers will continue to receive the same level of service
provision currently available through the network. 
However, the assessment has identified the potential for indirect or delayed impacts
arising from the decision not to progress service expansion during Phase 3 as originally
anticipated. This may affect individuals and communities with unmet transport needs,
particularly rural communities, disabled people, older people, young people, unpaid
carers and residents experiencing socio-economic disadvantage who may have benefitted
from future network growth. 
Performance monitoring undertaken during Phases 1 and 2 demonstrates that the project
has already contributed to increased public transport usage, improved access to
employment and education opportunities, and growing use of services by younger people
through the Young Scot and Under 22 travel schemes. Passenger journeys increased from
45,881 in 2022/23 to 85,309 in 2025/26, demonstrating continued growth in demand and
use of public transport services across Moray. 
Any potential indirect impacts are considered capable of mitigation through enhanced
evidence gathering, accessibility analysis, performance monitoring and targeted
engagement activities during Phase 3. The evidence generated will be used to identify
unmet demand, inform future service development and support evidence-based
investment decisions in Phases 4 and 5. As a result, the proposal is assessed as having
potential positive impacts overall, whilst recognising and mitigating the possibility of
indirect or delayed impacts associated with the postponement of planned service
expansion.  
6.11  Climate Change and Biodiversity Impacts 
The revised Phase 3 proposals are expected to have a positive impact on the Council's
climate change objectives through the development of enhanced data, monitoring and
analytical tools that will improve the measurement and evaluation of transport-related
carbon emissions and modal shift. The proposals will strengthen the evidence base used
to assess passenger demand, vehicle utilisation, network efficiency and the
environmental benefits associated with increased public transport use. 
Phase 3 will support improved identification of opportunities to reduce emissions through
service optimisation, more efficient deployment of resources and informed planning of
future network developments in Phases 4 and 5. The proposed approach also supports
ongoing monitoring of the environmental benefits delivered through the Bus Revolution
project, including reductions in private car use, increased public transport patronage and
the transition towards lower-emission vehicle technologies. 
No negative impacts on biodiversity are anticipated as a result of the revised Phase 3
revenue budget proposals.  
Page 233

Page 234

7.  CONSULTATION  
7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Operations and Environment, Chief Financial Officer, Service
Manager Legal Services, Service Manager Democratic Services, Service Manager People
Management, and the Equal Opportunities Officer and any comments made have been
incorporated into the report.  
8.  BACKGROUND PAPERS  
8.1  Nil. 
Page 234

Page 235

Appendix 1
Moray Council m.connect Public Transport Budget FY26-27 & FY27-28 (Phase 3 Bus
Revolution Project) 
Costs Cost of Operation         
(FY26-27)
Cost of Operation    
Phase 3                      
(FY27-28)
Baseline 
(Legacy Services / Operational
Costs)
£397,052 £410,949
Project 
(Operational Costs)
£684,479 £723,120
Project Costs
(App, Project Mgr, Marketing)
£69,000 £25,614
Total  £1,150,531 £1,159,683 
FY25-26 Income FY27-28 Income
Phase 3 
Baseline (legacy services)
Farebox Income 
£122,645 £122,645
Project 
Farebox Income 
£213,625 £245,984
Total Farebox Income  £336,270 £368,629
Baseline (legacy services)
Network Support Grant 
£24,468 £24,468
Project 
Network Support Grant 
£74,358 £80,151
Developer Contributions  £7,100 £0
Other Grants (T2E Funding) £21,900 £0
Total Income (Farebox, NSG &
Funding)
£464,096 £473,248
Net Subsidy Position 
(Cost minus Income) 
£686,435 £686,435
Page 235

Page 236

SPFINANCE-565096732-34   21/09/2026 14:36  
Page 236

Page 237

SPFINANCE-565096732-34   21/09/2026 14:36
Appendix 2 
INTEGRATED IMPACT ASSESSMENT COVERING 
• EQUALITIES & SOCIO-ECONOMIC DUTIES
• HUMAN RIGHTS AND RIGHTS OF THE CHILD 
DATE UPDATES/EXECUTIVE SUMMARY VERSION DETAILS
10.08.26 First draft of IIA completed and submitted to
SFC 11.08.2026 for consideration. 
V1.0   
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?   
Name of policy or proposal: Phase 3 Bus Revolution Objectives and Revenue requirements
Screening assessment 
Summary of proposal:
Bus Revolution is a £4.3m Moray Growth Deal project which aims to improve public transport
connectivity across Moray through demand responsive transport services, timetabled bus
services, digital technology and low-emission vehicle investment. The project is delivered
through five phases over a ten-year period.
Phases 1 and 2 focused on network expansion, increasing vehicle resource, extending
operating hours and introducing additional timetabled and demand responsive services.
Performance monitoring demonstrates that the project is exceeding key passenger growth
targets and delivering positive outcomes in relation to accessibility, social inclusion and
environmental performance.
The Bus Revolution Project Board has approved a revision to the aims and objectives of
Phase 3. Rather than further service expansion, Phase 3 will focus on:
Development of data and analytical tools;
Enhanced performance monitoring and evaluation;
Service optimisation and refinement;
Process improvement activities;
Page 237

Page 238

SPFINANCE-565096732-34   21/09/2026 14:36
Development of evidence to support future network expansion in Phases 4 and 5.
This proposal seeks approval of a revised revenue budget aligned to the revised Phase 3
objectives. No reductions to existing services, changes to eligibility criteria, fare changes or
reductions in accessibility are proposed.   
Is this a  Mark X below
New activity, programme or policy? 
Change to an existing activity, programme or policy? X
Budget proposal? X 
Duties: tick the boxes you think apply No Maybe                                                                                                                                             Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics? 
Consider the impact of your proposal on people and how they
access your services and information without barriers. 
X 
Socio-economic 
Not every person/family has access to regular income or savings.
Will your proposal have an adverse impact on them 
X 
Does your proposal impact on the human rights of people?  X  
Does your proposal impact on the rights of children and young
people 
X  
Reasoning
Equalities: The proposal does not reduce current public transport provision or accessibility.
However, improved analytical capability may positively influence future service planning and
accessibility outcomes for older people, disabled people, young people and residents living
in rural communities. Therefore a potential positive impact exists. 
Socio-economic: Public transport is a key enabler of access to employment, education,
health and recreational opportunities. Improved evidence and analysis will support better
targeting of future transport investment towards communities experiencing transport
disadvantage. Therefore a potential positive impact exists 
If you have answered “maybe” or “yes” to any of the Stage 1 questions above, then
proceed to complete the Stage 2 Integrated Impact Assessment questions below.
Page 238

Page 239

SPFINANCE-565096732-34   21/09/2026 14:36 
If you have answered “no” to the Stage 1 questions above, then provide the details
below and submit to [email] 
Lead Officer for developing the contract  Nicola Moss (Head of Operations and
Environment)
Other people involved in the screening (this
may be council staff, partners 
or others i.e. contractor or community) 
Stevie Robertson (Project Officer)
Donald MacRae (Public Transport Manager)
Date 10.08.2026 
Page 239

Page 240

SPFINANCE-565096732-34   21/09/2026 14:36 
STAGE 2: INTEGRATED IMPACT ASSESSMENT 
Brief description of the affected service
1. Describe what the service does: 
Public Transport provider of Timetabled bus and on-demand (door-to-door) bus services
across Moray.
2. Who are your main stakeholders? 
Scottish Government 
Transport Scotland 
Highlands and Islands Regional Transport Partnership
Moray Growth Deal – Programme Board  
Bus revolution – Project board 
Public Transport Unit 
General Public 
3. What changes as a result of the proposals? Is the service reduced or removed? 
The proposal does not reduce or remove any existing service provision. 
The proposal revises the objectives of Phase 3 from network expansion to service
optimisation, data development, performance evaluation and process improvement. The
revised revenue budget supports the development of analytical capability which will improve
future network planning and investment decisions. 
4. How will this affect your customers? 
No direct adverse impacts on existing customers have been identified. Passengers will
continue to receive existing levels of service provision. However, some communities and
individuals with unmet transport needs may experience a delayed benefit as a result of
Phase 3 not delivering the service expansion originally anticipated. Long-term benefits are
anticipated through improved service planning, better understanding of passenger demand,
improved accessibility analysis and evidence-led future service development
5. Impact on staff providing the service 
Nil. 
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race  No
Disability  Potential positive impacts: 
Page 240

Page 241

SPFINANCE-565096732-34   21/09/2026 14:36
Improved understanding of accessibility needs.
Better evidence to support future service design.
Enhanced monitoring of transport barriers.
Improved targeting of future investment 
Potential indirect impact: Service enhancements
that may have benefitted disabled people with
unmet transport needs will not progress during
Phase 3. This will be monitored through
accessibility analysis and future service planning.  
Carers (for elderly, disabled or
minors)
No
Sex No
Pregnancy and maternity (including
breastfeeding)
No
Sexual orientation No
Age (include children, young people,
midlife and older people)
Potential positive impacts: 
Better understanding of transport needs of older
people and young people.
Improved access to services through evidence-led
network planning.
Enhanced evaluation of passenger demand and
travel patterns. 
Potential indirect impact: Some unmet transport
needs affecting older people and young people may
remain unaddressed until future phases of network
development.
Religion, and or belief No
Gender reassignment No
Inequalities arising from socio-
economic differences
Potential positive impacts: 
Improved identification of transport barriers.
Enhanced understanding of access to employment,
education and services.
Better targeting of future transport investment to
disadvantaged communities.
Support for inclusive economic growth objectives 
Potential indirect impact: Communities
experiencing transport disadvantage may
Page 241

Page 242

SPFINANCE-565096732-34   21/09/2026 14:36
experience a delay in receiving additional transport
opportunities previously associated with planned
network growth. 
Human rights
List of convention rights Describe, where applicable, if and how
specific rights are engaged  
Article 5: Right to liberty and
security 
Article 6: Right to a fair trial 
Article 8: Right to respect for private
and family life, correspondence and
the home 
Article 10: Freedom of expression 
Article 11: Freedom of assembly
and association 
Article 12: Right to marry 
Article 14: Prohibition of
discrimination (in relation to the
convention rights) 
Article 1 of Protocol 1: Protection of
property 
Article 2 of Protocol 1: Right to
education 
Article 3 of Protocol 1: Right to free
elections by secret ballot 
Children’s Rights and Wellbeing 
Relevant articles – UNCRC 
Article 2 – Non discrimination 
Article 12 – Respect of the views of the
child 
Article 3.1 – Best interest of the child 
Article 6.2 – Right to survival and
development 
7. Evidence. What information have you used to make your assessment? 
Performance data Service Data –
Bus Revolution Benefit Monitoring Plan.
Page 242

Page 243

SPFINANCE-565096732-34   21/09/2026 14:36
Passenger journey growth monitoring.
Revenue and patronage performance reports.
App analytics and service demand analysis.
Workforce mobility and transport accessibility projects currently
under development.
Project Board decision approving revised Phase 3 objectives.
Internal
consultation
Public Transport Unit 
Project Board 
MGD Programme Board 
Consultation with
affected groups 
Local statistics 
National statistics 
Other Operational and Project Revenue budget reviews 
8. Evidence gaps 
Do you need additional information in order to complete the information in the previous
questions?
Additional evidence relating to unmet transport demand, accessibility barriers and
community transport needs would strengthen future service planning and help inform
decisions regarding Phase 4 and 5 service expansion. 
9. Mitigating action 
Can the impact of the proposed policy/activity be mitigated?  Please explain 
While no direct negative impacts have been identified, the proposal has the potential to
create indirect or delayed impacts through the postponement of service expansion
previously anticipated within Phase 3. These impacts may particularly affect rural
communities, disabled people, older people, young people, unpaid carers and residents
experiencing socio-economic disadvantage where unmet transport needs remain. 
Mitigation will be achieved through enhanced data collection, accessibility analysis,
performance monitoring, targeted stakeholder engagement and identification of unmet
demand during Phase 3. The evidence generated will be used to inform future service
development and investment decisions in Phases 4 and 5 and ensure resources are targeted
towards areas of greatest need. 
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed policy/activity must
go ahead, what justification is there to continue with the change?   
Page 243

Page 244

SPFINANCE-565096732-34   21/09/2026 14:36
SECTION 3 CONCLUDING THE IIA 
Concluding the IIA 
1. No direct negative impacts on protected groups were identified.
Potential indirect or delayed impacts associated with the postponement
of service expansion have been identified and can be mitigated
X
2. Some potential negative impacts have been identified.  X 
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010 
Promoting equality of opportunity X
Fostering good relations 
3. The proposals interfere with human rights and/or the rights of the child 
4. Negative impacts can be mitigated 
No direct adverse equality, socio-economic, human rights or children's
rights impacts have been identified. Potential indirect or delayed impacts
associated with the decision not to progress service expansion during
Phase 3 have been recognised. These impacts are considered capable of
mitigation through enhanced evidence gathering, performance
monitoring, accessibility analysis and engagement activity, which will
inform future service development and investment decisions
X
5. The negative impacts cannot be fully mitigated  
6. Further consultation with affected groups is needed. 
7. It is advised not to go ahead with the proposals. 
Decision 
No adverse equality, socio-economic, human rights or children's rights impacts have been
identified.
Page 244

Page 245

SPFINANCE-565096732-34   21/09/2026 14:36 
The proposal does not reduce existing public transport services, alter fares, change eligibility
arrangements or diminish accessibility. The revised Phase 3 approach focuses on improving
analytical capability, performance monitoring and evidence-led planning which is expected
to have a positive impact on future service development and investment targeting. 
The proposal supports equality of opportunity by improving the Council's understanding of
transport barriers experienced by rural communities, older people, disabled people, young
people and those experiencing socio-economic disadvantage. The enhanced evidence base
will inform future phases of Bus Revolution and help ensure resources are directed towards
areas of greatest need. 
Decision - Proceed 
Date of Decision: 11.08.2026 
Page 245

Page 246

SPFINANCE-565096732-34   21/09/2026 14:36
Sign off and authorisation: 
Service Operations & Environment Services
Department Transportation
Policy/activity subject to IIA Bus Revolution Phase 3 Objectives and Revised
Revenue Budget  
We have completed the integrated impact
assessment for this policy/activity. 
Name: Stevie Robertson 
Position: Senior Project Officer
Date: 10.08.2026
Authorisation by head of service  Name: Nicola Moss
Position: Head of Operations & Environment
Services 
Date: 17.08.2026
Permission to publish on website – Yes 
Please return this form to the Equal Opportunities Officer, Chief Executive’s Office. 
Page 246

Page 247

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author:  Paul Wolverson Contact Email: paul.wolverson@moray.gov.uk 
Subject: Introduction of booking system at Forres Household Waste and
Recycling Centre 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider and approve the installation and introduction of a
booking system at Forres Household Waste and Recycling Centres (HWRC).  
1.2  This report is submitted to Council in terms of Section III (F) (22) of the Council’s Scheme
of Administration relating to determining arrangements for waste management, street
sweeping, refuse collection and refuse disposal including recycling.  
2.  SUMMARY  
2.1  During COVID 19 all HWRC sites had a booking system in place to control access. Post
COVID 19 this was removed from all sites apart from Elgin HWRC.  This remains in place to
control visitor numbers following health and safety issues relating to queueing traffic.  
2.2  Currently, regular traffic issues and queuing are being experienced at Forres HWRC, which
is creating a road traffic and health and safety issue.  A contributing factor to these traffic
issues is improved health and safety on site.   In addition, whilst no quantifiable data is
available, it is perceived that the HWRC sites are used by people from outside of Moray, as
well as commercial traders.  The costs associated with disposing of that waste is then met
by the Council.  
2.3 To address the road traffic and health and safety issues at Forres HWRC it is proposed that
a booking system, and Automatic Number Plate Recognition (ANPR)/barrier system is
introduced.  Whilst the primary driver for introducing a booking system relates to traffic
management and health and safety issues, the project would also have the added benefit
of controlling out of area use by non Moray residents, as well as helping address misuse by
commercial traders. 
Item 14.
Page 247

Page 248

2.4 The booking system at Forres HWRC would work on the same basis as the one at Elgin
HWRC, with restricted visitor numbers per time slot. Bookings can be made up to an hour
before a visit, subject to availability.    
2.5 The estimated cost of the installation of an ANPR and barrier system for Forres HWRC is in
the region of £29.5K.  It is proposed that this project is added to the capital plan for
2026/27 as a spend to save initiative.  Whilst no quantifiable information is available, it is
estimated that the introduction of a booking system would reduce waste disposal costs in
the future, by restricting access for non Moray residents and commercial traders, so the
project would have the additional benefit of being a spend to save investment over the
longer term. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Council:   
(i) consider and note the contents of this report;   
(ii) consider the recommendation in 8.1;   
(iii) approve the introduction of a booking system at Forres HWRC as outlined in
section 5; and   
iv) approve the booking system is added to the capital plan for 2026/27 as a
spend to save initiative 
Paul Wolverson
Service Manager Environmental Services 
4.  BACKGROUND AND CONTEXT  
4.1 During COVID 19 a booking system was introduced at all HWRC sites as a means of
controlling visitor numbers on site. Following the lifting of COVID restrictions, the booking
system was removed from all sites apart of Elgin HWRC. The booking system at Elgin
HWRC remains in place. Appointments can be booked up to an hour before a visit, subject
to availability.    
4.2 The booking system remained post Covid as a means of preventing traffic queuing either
back onto the A96 or within the Chanonry Industrial Estate, which represented both a
health and safety issue on a major trunk road and a congestion/nuisance issue to
organisations located within the Industrial Estate.  
4.3 In order to be able to book an appointment, a person must provide a residential address
within Moray as part of the process.   Consequently, the booking system also acts a
control measure for preventing people who do not live in Moray depositing their waste at
the site, with the Council then paying the disposal cost for that waste.  The system also
acts as a deterrent for commercial traders as people will need to book, and enter their
name and vehicle details, and appointments can be analysed to look for patterns and
trends to address potential commercial misuse.    
Page 248

Page 249

4.4 Essential measures to improve health and safety on site have been implemented across
all HWRC sites.  This involves restricting access on site when skip changes are taking
place.  This has contributed to increased traffic queuing, particularly at Forres HWRC,
where this is causing issues for local residents and site users.  
4.5 Elgin, Buckie and Keith HWRC are all now closed on a Monday.  This has resulted in
increased traffic during the week at these sites, or displaced activity to Forres or Dallachy
HWRC.    
4.6 Most of the HWRC sites are restricted in terms of their size and are generally classed as
needing significant improvement.  The demand and increased usage on these sites will
continue to grow in line with local new build housing developments.  However, in the
absence of alternative sites, and with increased usage at the sites, controlling visitor
numbers at Forres HWRC is viewed as a critical component for managing on site safety
and enhancing the user experience.  
4.7 Forres HWRC is a small site with a narrow single access and exit point.  The site is also
shared with Moray Waste Busters and so attracts additional visitor numbers as a result. 
The additional improvements to address health and safety concerns (to keep site users
and vehicles separate whilst skip changes are taking place-which are deemed necessary
to address health and safety concerns) are contributing factors to regular queuing traffic. 
This in turn creates a bottle neck situation and creates a nuisance for the neighbouring
property with vehicle owners using their grounds as a turning point to avoid queuing.   
4.8 Mitigation measures, in the form of creating a box junction at the entrance to the HWRC
site, together with the installation of vehicle directional priority signage on the road
approaching the HWRC site, have been implemented at Forres HWRC, in an attempt to
ensure the flow of traffic is maintained. Unfortunately, these measures have not been
completely successful in resolving the issue and regular queuing traffic, and the
associated traffic and health and safety issues, is still being experienced and reported on a
regular basis.        
4.9 A photograph illustrating the queuing traffic issues experienced at Forres HWRC is shown
in Appendix 1.  This photograph shows the traffic double queuing despite the traffic
priority signage being in place. 
4.10 Over the last year the Council has received a number of formal complaints from users of
Forres HWRC with regards traffic queuing, the size of the queue and the time they have
had to sit in a queue of traffic.  
4.11 Though no quantifiable data is currently available, on usage or cost, it is believed that
HWRC sites are subject to misuse by people residing in Highlands and Aberdeenshire
(particularly as booking systems are in operation for the use of Huntly and Nairn HWRCs). 
The consequence of this is that the disposal cost for the waste deposited by non-residents
is then met by the Council.  In addition, any residual waste deposited will negatively
impact on the Council’s recycling rate.   
4.12 Though no quantifiable data is available on usage or cost, it is also the considered view
that the HWRC sites will be subject to misuse by commercial traders given there are
limited control measures in place to manage this.  This is compounded by the fact that the
Page 249

Page 250

sites are operated by a single person who has limited capacity to challenge the use by
suspected commercial users, given the other duties they are required to undertake to
ensure the site is being used responsibly.  Again, the disposal cost of this waste will be
met by the Council.   
4.13 In line with the Environmental Protection Act 1990, local authorities are required to
provide HWRC sites for the disposal of household waste. Commercial entities should have
alternative measures in place, rather than depositing at a HWRC site, to dispose of the
waste they produce in line with their duty of care under the same legislation.    
4.14 One possible concern could be that the introduction of a booking system could lead to an
increase in fly tipping.  However, no increase in fly tipping was, or is being, experienced
following the introduction of a booking system at Elgin HWRC.  It is therefore the
considered view that fly tipping would not increase, should a booking system be
introduced at Forres HWRC.     
5.  PROPOSALS  
5.1  The primary issue currently being experienced at Forres HWRC relates to regular traffic
and queuing issues which creates a health and safety/nuisance issue.  However other
issues relating to use by non-moray residents (out of area use) and use by commercial
traders are also a factor at the site.  Both of these issues result in additional cost for the
Council.  
5.2 To address these issues it is proposed that a booking system is introduced at Forres HWRC
together with an ANPR and barrier system.  
5.3 It is proposed that the booking system would be in line with that provided at Elgin HWRC. 
Bookings can be made up to an hour in advance. Currently there are 20 slots available in a
20 minute time period.  This would be monitored to ensure that the number of slots
represent the demand on site, have the desired effect on addressing queuing traffic but
could be changed to improve efficiency and availability.  
5.4 In principle the scope of the works on site would include: 
• ANPR camera/s at the entrance/exit
• Barrier/s
• Infrastructure works to supply electricity to the camera/s and barrier/s
• Potential reconfiguration of traffic management system on site 
6 COSTS  
6.1 As the Council currently already has the use of the booking software system (Pentagul),
there are no additional upfront costs associated with procuring the system.  There are also
no additional on-going costs involved with implementing the system at additional sites.    
6.2 The indicative cost associated with installing the ANPR and barrier system at Forres HWRC
is estimated to be in the region of £29.5K.   The actual amount will not be known until an
accurate cost of the civil works involved is known.  The one-off costs include the
procurement of cameras/barriers and the installation costs, together with a reactivation
Page 250

Page 251

cost (the sites were already on the software system but were deactivated post Covid).  It is
proposed that this project is added to the capital plan for 2026/27 as a spend to save
initiative. 
6.3 Whilst the primary driver for introducing a booking system is to address road traffic and
associated health and safety issues, it is envisaged that savings will be made on waste
disposal costs through the introduction of a booking system.  As any savings cannot be
quantified at this stage, this will be monitored if the introduction of a booking system is
approved. 
7 PROS AND CONS  
7.1 The anticipated pros of introducing a booking system have been summarised in the table
below: 
Pro Rationale
Reduced congestion and traffic
queuing
Would allow the number of visitors to be controlled
so improving the ability to manage traffic flow and
reduce queueing.   
Improved health and health Given that sites are a single person operated site,
having more control over the number of people
visiting the site allows the site to be better managed
and reduce any conflicts between vehicles and site
users. 
Reduced waste disposal costs   Restricting access to the site for Non-Moray
residents and to Commercial Traders. No
quantifiable data is available but it is anticipated that
there will be a saving in disposal costs, but at this
stage this cannot be quantified. 
Restricting/Reducing the numbers on site would also
potentially release time for the site attendant to be
more proactive in managing trader misuse. 
Improved user experience  By allowing people to book a time slot the user
experience should be improved as users should be
able to attend site without the need to queue.
In addition, with the removal of out of area and
commercial misuse, the capacities within the skips
and storage bays should last longer meaning fewer
restrictions on what can be accepted during a visit.
Improved impact for local
residents 
Reducing the queueing traffic would improve the
conditions for those people that live in close
proximity to the sites. In addition, reduced queuing
will reduce any potential conflict between people in
the queue, which has been reported. 
Improved partnership working Will assist Moray Waste Busters in terms of their
ability to manage delivery numbers.  Preliminary
discussions have taken place with Moray Waste
Busters who were positive about the introduction of a
booking system.     
Page 251

Page 252

7.2 The anticipated cons of introducing this system have been summarised in the table below: 
Cons Rationale
Additional Spend Will require additional funding   
Change from a non-booking
system
This will be a change from the current system
whereby people can turn up and use the site without
the need to book.
May make access to the sites
more difficult 
Some people may not have access to the necessary
ICT (computer, phone, laptop) needed to make
booking. 
Inconsistency of approach Only having a booking system in place at certain 
sites would result in an inconsistent approach and
may displace users to alternative sites. 
8.  Recommendation  
8.1 It is recommended that a booking system (and associated ANPR/barrier system) is
introduced at Forres HWRC to: 
• Address the on-going regular traffic management (and associated health and safety
issues) and queuing issues experienced at the site
• Improve the user experience
• Prevent non-Moray residents from using the facility so reducing the waste disposal
cost for the Council
• Address commercial misuse and reduce the waste disposal costs for the Council.  
8.2 If a booking system is introduced at Forres HWRC, monitoring the impact of this with
regards the amount of waste that is disposed of, and the associated disposal cost, will be
undertaken.  Should there be a significant reduction in terms of the tonnage and costs,
and the introduction of a booking represents a viable spend to save proposal, then a
further report will be brought to committee for Members to consider the possible
expansion of a booking system at the other HWRC sites.   
9. SUMMARY OF IMPLICATIONS  
9.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X  
Policy and Legal X 
Financial X 
Risk X 
Staffing  X
Best Value and Transformation X 
Property X 
Information Communications Technology/Digital            X
Page 252

Page 253

Equalities. Social Inclusion and Economic Impact           X  
Climate Change and Biodiversity Impact         X   
9.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
9.3 Policy and Legal 
The Council has a legal duty to provide Household Waste and Recycling Centres. However,
there are no legal issues with regards the use of a booking system for access. 
9.4 Financial 
The one-off financial implications associated with the proposals are shown below. 
If the proposals are not introduced the Council will continue to pay the waste disposal
costs for waste generated from properties out of Moray and/or commercial entities.
Though currently no quantifiable data is currently available to calculate the costs. 
One off Costs:
Service Area Budget Budget
Years
Proposed
Spend
this Year
Virement
From
Other
Comments
Environmental
Services 
Forres HWRC  £29.5K  2026/27  £29.5K 
Added to
capital
plan for
2026/27 
Costs are
the one off
costs for
the
installation
and
reactivation
of the
software 
Page 253

Page 254

Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
9.5 Risk 
The risks associated with not progressing these proposals are: 
• There will continue to be a regular queuing traffic and associated nuisance and health
and safety issue at Forres HWRC, which impacts on the user experience and local
residents.    
• People who do not reside in Moray will continue to be able to access the sites to
dispose of their waste, and the Council will continue to pay the cost of disposal for
that waste.  Any residual waste disposed of will also negatively impact on the Council
recycling rate.
• Commercial traders will continue to have unofficial access to the sites to dispose of
their trade waste.  The Council will continue to pay the disposal costs for this waste. 
Any residual waste disposed of will also negatively impact on the Council recycling
rate. 
9.6 Staffing 
There are no staffing implications as a result of this report.  
9.7 Best Value and Transformation 
Ensuring that the Council only pays for the disposal of the waste generated from Moray
residents aligns with ensuring Best Value. 
Expanding the booking system aligns with the Council being Transformative to reduce
ongoing costs and improve efficiency and effectiveness of service delivery.    
9.8 Property 
The only Property implications, as a result of this report, relate to any infrastructure changes
needed on site to set up the barrier system.  
9.9 Equalities, Social Inclusion and Economic Impact 
An IIA has been completed and is included in Appendix 2 of this report. Some impacts have
been identified. 
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Page 254

Page 255

Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ✓ ✓ ☐
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ✓ ✓ ☐
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
Protected characteristics
Age- There may be the potential for the proposal to negatively impact on this group as they
be less inclined or familiar with the use of ICT/smart phones which is needed to make a
booking. 
There may be a positive impact on this group as controlling visitor numbers would reduce
queuing and improve the user experience. 
Disability- There may be the potential for the proposal to negatively impact on this group
as they be less inclined or familiar with the use of ICT/smart phones which is needed to
make a booking.
There may be a positive impact on this group as controlling visitor numbers would reduce
queuing and improve the user experience. 
Race- There may be the potential for the proposal to negatively impact on this group as
there may be a language barrier and may have difficulty navigating or understanding the
booking process 
There may be a positive impact on this group as controlling visitor numbers would reduce
queuing and improve the user experience. 
Socio-economic disadvantaged
Page 255

Page 256

There may be the potential for the proposal to negatively on the socio-economic
disadvantaged as the booking system will require the access to ICT/smart phones which
this group may not have access too.   
There may be a positive impact on this group as controlling visitor numbers would reduce
queuing and improve the user experience. 
9.10 Climate Change and Biodiversity Impacts 
There is the potential for a reduction in climate change impacts based on reduced emissions
from queuing traffic. 
10. CONSULTATION  
10.1 This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Head of Operations and Environment, Chief Financial Officer, Service
Manager Legal Services, Service Manager Democratic Services , Service Manager People
Management, Waste Manager, Equal Opportunities Officer and any comments made have
been incorporated into the report.  
11 BACKGROUND PAPERS  
11.1 None.  
Page 256

Page 257

Appendix 1 
Page 257

Page 258

Page 258

Page 259

Appendix 2
INTEGRATED IMPACT ASSESSMENT (IIA)
This assessment covers Equalities & Socio-Economic Duties, Human Rights & Rights of the Child (UNCRC)
Please refer to IIA Guidance for assistance completing this assessment. 
DATE
DD/MM/YY
UPDATE(S) - Add section(s) revised & brief note of revision e.g. Q.7 Public consultation data / findings added.   SHAREPOINT VERSION
DETAILS - CLT USE ONLY 
NAME OF PROPOSAL  Introduction of a booking system at Forres Household Waste and Recycling Centre (HWRC) 
STAGE 1 INITIAL SCREENING – Is the proposal a: Please ✓
New strategy, policy, project, plan, service, funding, full budget? ☐
Change to an existing strategy, policy, project, plan, service, funding, budget (including reduction / removal staff levels, hours
changed, posts)?
✓
Budget proposals? ☐
If none of the above apply, NO IIA is needed.  
If any of the above are ticked, does the proposal have the potential to affect
people from the below categories differently to the wider Moray population: 
Yes Maybe No
Positive Negative Positive Negative
Any protected characteristics individuals or groups (Equality Act 2010) ☐ ☐ ✓ ✓ ☐
Any socio-economic disadvantaged individuals or groups – i.e. low / no income /
wealth or deprivation
☐ ☐ ✓ ✓ ☐
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People (UNCRC) ☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the above boxes have been selected 
Protected characteristics
Page 259

Page 260

Age- There may be the potential for the proposal to negatively impact on this group as they be less inclined or familiar with the use of
ICT/smart phones which is needed to make a booking. 
There may be a positive impact on this group as controlling visitors numbers would reduce queuing and improve the user experience. 
Race- There may be the potential for the proposal to negatively impact on this group as there may be a language barrier and may have
difficulty navigating or understanding the booking process 
There may be a positive impact on this group as controlling visitors numbers would reduce queuing and improve the user experience. 
Socio-economic disadvantaged 
There may be the potential for the proposal to negatively on the socio-economic disadvantaged as the booking system will require the
access to ICT/smart phones which this group may not have access too.   
There may be a positive impact on this group as controlling visitors numbers would reduce queuing and improve the user experience. 
STAGE 1 Sign Off
Lead Officer Signature 
Date 
Names of others involved in
STAGE 1 initial screening 
If any STAGE 1 answers above are ‘Maybe’ or ‘Negative’ please complete STAGE 2 and refer to IIA Guidance for help.  
STAGE 2 – FULL IIA
1. Please give a brief description of the current service / proposal.
The current service involves people having access to the Forres HWRC without the need to make a booking. People can turn up and use the
site whenever they choose.  There is no control on visitor numbers. 
2. Who are the main stakeholders? E.g. Customers, staff, families, carers, partners, community groups. 
Page 260

Page 261

Staff
Moray residents that use the sites
Partners (Moray Waste Busters)
Moray Residents that live local to the sites 
3. What changes as a result of the proposal(s)? 
A booking system would be introduced at either Forres HWRC. People would need to make an on-line booking to gain access to the site. 
4. Does the proposal affect your customers? If so, how does it affect them?  
The proposal would affect the customer as this will be a change to the current practice. Customers would need to pre-book an allocated
space online instead of turning up at the facility. Reliance would be on digital devices and skills to be able to do this.  Prior thought will
need to be given to when people want to visit the HWRC, though bookings would be able to be made up to an hour in advance of a visit,
subject to availability for Forres HWRC. 
The proposal would also improve the user experience as queuing for access would be reduced. 
5. What impact will the proposal have on staff providing the service? 
The system would improve the health and safety and management of these sites through controlling visitor numbers, rather than having a
peak and trough scenario which can happen whilst people are currently able to turn up without making a booking. 
6. EVIDENCE - Please provide details / links to the information you have used for this assessment.
CONSULTATION(S) – What consultation / engagement has been carried out to inform the IIA? 
Internal consultation Discussions with the waste team
Consultation with affected groups  Discussions have taken placed with Moray Waste Busters and a resident local to the
Forres HWRC.
DATA – What has been used to inform the IIA?
Page 261

Page 262

Local Performance Data (e.g. usage
statistics)
Observational- Observations from staff within waste management and reports from
HWRC site attendants. 
Number of complaints re queuing- Local Resident to Forres and also social media
reports. 
National statistics 
Other – Research / Best Practice / Guidance Other mitigation measures in the form of hatching and the installation of priority signage
have been introduced at Forres HWRC but this has had limited affect. 
Evidence Gaps – Do you need any additional
information? If so, please explain. 
7. EQUALITIES AND SOCIO-ECONOMIC IMPACT(S) - Please identify any impact to each group.  Please see guidance for examples.
Protected Groups –
Please use link for more
information
Positive Impact(s)  Negative Impact(s) Mitigation(s) – Practical actions/adjustments to reduce or
eliminate any negative impact(s).  What can be done to make it
fairer?
Age (include children,
young people, midlife
and older people)
Controlling visitor
numbers would
reduce queuing and
improve the user
experience. 
Potential Impact -
Less inclined or
familiar with the use of
ICT/smart phones
which is needed to
make a booking.
System is already in place at Elgin with no reported on-going
issues with regards this protected characteristic. 
Those unable to make a booking online can:
1. Call the contact centre/ waste team who will make a
booking on their behalf (if they don’t have a smart
phone)
2. Visit an access point/library and make a booking
through their technology
3. Can email the waste team who will assist with making a
booking   
Page 262

Page 263

Carers (for elderly,
disabled or minors)   
Disability Controlling visitor
numbers would
reduce queuing and
improve the user
experience.
Potential Impact -
Less inclined or
familiar with the use of
ICT/smart phones
which is needed to
make a booking.
System is already in place at Elgin with no reported on-going
issues with regards this protected characteristic. 
Those unable to make a booking online can:
1. Call the contact centre/ waste team who will make a
booking on their behalf (if they don’t have a smart
phone)
2. Visit an access point/library and make a booking
through their technology
3. Can email the waste team who will assist with making a
booking  
Gender reassignment   
Marriage and civil
partnership   
Pregnancy and maternity
(including breastfeeding)   
Race Controlling visitor
numbers would
reduce queuing and
improve the user
experience. 
Potential Impact -
There may be a
language barrier and
may have difficulty
navigating or
System is already in place at Elgin with no reported on-going
issues with regards this protected characteristic.  
Those unable to make a booking online can:
Page 263

Page 264

understanding the
booking process.
1. Call the contact centre/ waste team who will make a
booking on their behalf (if they don’t have a smart
phone)
2. Visit an access point/library and make a booking
through their technology
3. Can email the waste team who will assist with making a
booking  
If language barrier is an issue, the Council’s interpretation
service would be available to help people make a booking. 
Religion and / or belief   
Sex   
Sexual orientation   
Inequalities arising from
socio-economic
disadvantage
Controlling visitor
numbers would
reduce queuing and
improve the user
experience. 
Potential Impact - The
booking system will
require the access to
ICT/smart phones
which this group may
not have access too.  
System is already in place at Elgin with no reported on going
issues with regards this protected characteristic.  
Those unable to make a booking online can:
1. Call the contact centre/ waste team who will make a
booking on their behalf (if they don’t have a smart
phone)
2. Visit an access point/library and make a booking
through their technology
Page 264

Page 265

3. Can email the waste team who will assist with making a
booking   
HUMAN RIGHTS – Please use link to see all that
may apply and add or remove below
Does proposal interfere
(limit, restrict or make it
harder to enjoy) right(s)? 
Mitigation(s) – Practical actions/adjustments to reduce /
eliminate negative impact(s).  How do we make it fairer?
Article 5 Right to liberty and security No 
Article 6 Right to a fair trial No 
Article 8 Respect for private / family life, home
and correspondence
No 
Article 10 Freedom of expression No 
Article 11 Freedom of assembly and association No 
Article 14 Non-discrimination No 
Protocol 1, Article 1- Right to peaceful
enjoyment of property
No 
Protocol 1, Article 2 - Right to education No 
RIGHTS OF CHILDREN & YOUNG PEOPLE (UNCRC)
Please use link to identify all that apply and add
below
How does proposal
interfere with rights?
(limit, restrict or make it
harder to enjoy)
Mitigation(s) – Practical actions/adjustments to reduce /
eliminate negative impact(s).  How do we make it fairer?
Article 2 – Non discrimination No 
Article 3 – Best Interest of a Child No 
Article 6 – Right to life, survival and development No 
Article 12 – Respect the views of the child No 
Article 23 – Children with a disability No 
Page 265

Page 266

8. Justification – Show balanced consideration of any impacts / lack of mitigations against the proposal need / outcome.   E.g. Is it
considered proportionate, appropriate, necessary and / or unavoidable i.e. overriding public benefit. 
Some negative impacts have been found that cannot be fully mitigated, but they can be justified as follows:
• The system is already in place at Elgin HWRC and there are no reports of equality issues
• The introduction of a booking system would improve on site health and safety 
• The introduction of a booking system would reduce the impact of queuing for local neighbours to the site
• It is anticipated that the introduction of a booking system would reduce disposal costs for the Council- though the amount is not
quantifiable at this stage. 
• Alternative booking process available for the groups that may need assistance and / or are not able to use the online booking
system. 
STAGE 3 – IMPACT SUMMARY Please Tick (√)
Negative Impacts Identified 
• Can be mitigated and justified (Q7 above)  ☐
• Cannot be fully mitigated, but are justified (Q8 above) ✓
• Cannot be fully mitigated nor justified (Q7 & Q8 above) ☐
The proposals interfere with Human Rights and /or the Rights of the Child ☐
Further consultation with affected groups is needed ☐
It is advised not to go ahead with the proposals ☐
FINAL DECISION – Include any Committee / Board recommendations and /or rationale for approving proposal or not.
The proposal will be presented to Full Council on 30 September 2026 for consideration and / or final decision on whether to proceed with
the proposal or not.
Committee / Board Final Decision – 
Page 266

Page 267

FINAL AUTHORISATION / SIGN OFF - Final IIAs will be published to www.moray.gov.uk/IIAs at point of final decision.
Service Environmental Services Dept. Operations and Environment Permission
to Publish
✓
IIA Completed
By
Name  Paul Wolverson Date 26/08/26
Position Service Manager
Signed off by
Head of Service
Name  Date 
Page 267

Page 268

Page 268

Page 269

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Finance, Strategy and Transformation      
Author: James Taylor Contact Email: James.taylor@moray.gov.uk 
Subject: Options for Additional Council Tax Charge and Second Home Premium 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to seek approval to consult on options for the future level of the
Additional Council Tax Charge, levied on long term empty properties and the Second Home
Premium.  
1.2  This report is submitted to Council in terms of Section III (B) (11) of the Council’s Scheme
of Administration relating to the administration of the levy, collection, payment and
recovery of Council Tax.  
2.  SUMMARY  
2.1  This report outlines the options available to the Council following the Scottish
Government’s decision to remove the previous 100% statutory ceiling on the Additional
Council Tax Charge and Second Home Premium. It proposes a programme of work to
assess the potential financial, operational and policy implications of varying these
charges, including consideration of alternative charging structures, local reliefs and
exemptions. The report recommends a period of consultation to gather evidence and
stakeholder views on the future administration and level of these charges. The findings will
be presented to Council in January 2027 to support informed Member consideration of
future policy options. 
3.  RECOMMENDATION 
3.1  It is recommended that Council approve:   
i)  exploration of the options provided by the new legislation to amend the level
of the Additional Council Tax Charge;   
Item 15.
Page 269

Page 270

ii)  exploration of the options provided by the new legislation to amend the level
of the Second Home Premium; 
iii)  a period of public consultation to gather stakeholder views; and   
iv)  on completion of the exploratory work, a further report is brought back to
Council in January 2027 with findings and recommendations for Member
consideration.   
James Taylor
Service Manager Taxation 
4.  BACKGROUND AND CONTEXT  
4.1  On 1 April 2026 the Council Tax (Variation for Unoccupied Dwellings) (Scotland)
Amendment Regulations 2026 became law.  These introduced a national default of
100% for the Additional Council Tax Charge and the Second Home Premium, but also
permitted each Council to set its own rate at above or below the stated national
default.  
4.2  In the guidance issued by Scottish Government to accompany this legislation it is
stated that the option to vary the premium is viewed as a housing policy lever rather
than primarily as a tax-raising measure. The Government intends that it assists in the
provision of increased housing supply for permanent occupation and it supports the
sustainability of local communities.  
4.3  Regulations had been in place since 2013 which permitted Councils to add an
Additional Council Tax Charge to long-term empty properties.  The Council initially had
set a 50% Additional Council Tax Charge from 1 April 2014, increasing it to 100% from
1 April 2015. It currently remains at that level.  At 1 April 2026, 613 properties in Moray
were subject to the levy of this charge, raising gross Council Tax revenues of £0.944M
in 2026/27.  
4.4  Regulations had been in place since 2024 which permitted Councils to add a Premium
to the Council Tax account of Second Homes.  The Council set a 100% Second Home
Premium from 1 April 2024. It currently remains at that level.  At 1 April 2026, 632
properties in Moray were subject to the levy of this charge, raising gross Council Tax
revenues of £1.033M in 2026/27. 
4.5  The imposition of the Additional Council Tax Charge and the Second Home Premium
as a negative ‘incentive’ to bring unoccupied properties back into use a main
residence has only delivered minimal results.  In the period since the introduction in
2014 of the Additional Council Tax Charge to 31 March 2026, the number of Long Term
Empty Properties in Moray has decreased by 7.4% from 662 properties to 613.  In the
period since the 2024 introduction of the Second Homes Premium to 31 March 2026,
the number of Second Homes has decreased by 12.3% from 721 properties to 632.  
Page 270

Page 271

4.6  Collection Rates for the Additional Council Tax Charge and Second Home Premium
are high.  At 31 March 2026 the 2025/26 in-year collection percentages were 85.2%
and 97.7% respectively. 
4.7 The Scottish Government published a circular, Local Government Finance Circular
6/2026, earlier this year on the treatment of unoccupied properties for Council Tax
purposes.  Cognisance is taken in this Report of the comments made in section 8 of
this Circular, ‘Considerations and Discretionary powers to vary the discount/increase’.  
4.8 A current locally-agreed Council policy makes provision for relief to be offered to
taxpayers in a number of different circumstances – for example, property being offered
for sale, property being reconstructed, etc. – from the levy of the Additional Council
Tax Charge, but taxpayers responsible for a property on which the Second Home
Premium is levied are unable to access any similar reliefs.  
4.9 An Integrated Impact Assessment (IIA) exercise has been undertaken to demonstrate
the potential impact of any decision to amend the Additional Council Tax Charge and
the Second Home Premium.  The draft IIA outcome assessment sheet is attached as
Appendix 1 to this report.  
4.10 Current practice across Scotland is varied, with some authorities implementing or
exploring enhanced charges whilst others continue to operate at the national default
level. No authority has been identified as having formally ruled out future use of the
discretionary powers contained within the legislation. The following paragraphs
provide details on authorities who have implemented, or are actively exploring, the
additional charges. 
4.11 Aberdeenshire Council is levying from 1 September 2026 a 200% Additional Council
Tax Charge on Long Term Empty Properties, and a 200% Premium on Second Homes.
Having previously set these charges as part of its budget setting processes, at the time
of drafting this report, it is currently consulting on the reliefs and reductions that are to
be made available.  
4.12 City of Edinburgh Council is levying from January 2027 a 300% Additional Council Tax
Charge on Long Term Empty Properties and a 300% Premium on Second Homes. It
offers twelve months relief from the Additional Council Tax charge if the property is
being actively marketed for sale or rent. Having adopted the Sottish Government
guidance stated in Local Government Finance Circular 6/26, it invites taxpayers who
do not think that they should have to pay the Second Homes Premium to write to them
via a designated e-mail address.  
4.13 Glasgow City Council is levying from 1 April 2026 a 200% Additional Council Tax
Charge on Long Term Empty Properties, and a 200% Premium on Second Homes. It
offers twelve months relief from the Additional Council Tax charge if the property is
being actively marketed for sale or rent but offers no provision for a discretionary
reduction in the Second Home Premium.  
4.14 Highland Council is levying from 1 April 2026 a 200% Additional Council Tax Charge on
Long Term Empty Properties, and a 200% Premium on Second Homes. It invites
taxpayers to apply for the exercise of discretion in imposition of both the Additional
Page 271

Page 272

Council Tax Charge and Second Home Premium via an application form hosted on
their website. The taxpayer is invited to submit evidence in support of their
application.  
4.15 Perth and Kinross Council is levying from 1 July 2026 a 200% Additional Council Tax
Charge on Long Term Empty Properties. It invites taxpayers to apply for the exercise of
discretion in imposition of the Additional Council Tax Charge via an online application
form. Criteria which the taxpayer can cite are: taking steps to bring a property back
into use, the condition of the property preventing it being brought back into use within
the timescales allowed for by statutory reductions, external market conditions
resulting in the property taking unusually long to sell or rent, or any exceptional
circumstances. It offers no provision for a discretionary reduction in the Second Home
Premium.  
5.  PROPOSALS  
5.1  Based on the Scottish Government guidance, the key intended benefits of varying the
Additional Council Tax Charge and Second Home Premium are: 
• Increase the supply of homes available for permanent occupation by
encouraging long-term empty properties to be brought back into use. 
• Support sustainable and resilient local communities by increasing the number
of properties occupied as main residences. 
• Make more effective use of existing housing stock before relying on new
housing development.
• Improve access to housing for local residents by helping to address local
housing need and affordability pressures. 
• Encourage alternative use of second homes, including occupation as a main
residence or as housing available for rent.  
5.2 The impact of any increase in the Additional Council Tax Charge or in the Second
Home Premium may be illustrated at a high level and at an account level by making
reference to the Council Taxes levied in the financial year 2026/27. 
5.3 In point 4.3, above, it was stated that a 100% Additional Council Tax Charge raised
additional gross Council Tax revenues of £0.944M. The table below models three
scenarios: no behavioural change, a 10% reduction in long-term empty properties,
and a 50% reduction in long-term empty properties following the introduction of the
increased charge. Figures shown are incremental. 
Additional
Council Tax
Charge 
Incremental increase in Gross Council Tax Levied 
No behavioural
change
10% Properties
back in Use
50% Properties
back in Use
200% £0.944M £0.775M -
300% £1.888M £1.605M £0.427m 
5.4 In para 4.4, above, it was stated that a 100% Second Home Premium raised gross
Council Tax revenues of £1.033M. The table below models three scenarios: no
Page 272

Page 273

behavioural change, a 10% reduction second homes, and a 50% reduction in second
home following the introduction of the increased charge. Figures shown are
incremental. 
Second Home
Premium
Incremental increase in Gross Council Tax Levied 
No behavioural
change
10% Properties
back in Use
50% Properties
back in Use
200% £1.033M £0.826M -
300% £2.066M £1.756M £0.517M 
5.5 The impact of any increase can also be seen at account level. In a specimen 2026/27
Council Tax Account for a Band D property, the Council Tax Charge is £1,731.14, which
is payable over ten instalments of £173.10.  The increase in the amount payable as the
additional Charge is increases is: 
Additional Charge
Percentage 
Council Tax
Payable 
Monthly Instalment
Payable 
100%  £3,462.28  £346.20
200%  £5,193.42  £519.30
300%  £6,924.56  £692.50 
5.6 A programme to explore the options provided by the new legislation to amend the level
of the Additional Council Tax Charge and Second Home Premium has been
developed. The programme has been informed by the updated Scottish Government
guidance as noted in paragraph 4.2.  In summary: 
5.7 Officers will undertake an exercise to determine if it is appropriate to vary the level of
the Additional Council Tax Charge on long-term empty properties and the Second
Home Premium. 
5.8 In doing so, officers will review the reliefs from the Additional Council Tax Charge and
may bring forward proposal to update the suite of reliefs.  Consideration will also be
given to the introduction of reliefs from the Second Home Premium.  
5.9 A review on how the levy of the Additional Council Tax Charge may be structured will
be undertaken. This review may include the introduction of a ‘stepped’ increase in
Charge level based on the elapsed time that the property had been empty.  A similar
review of the manner in which the levy of the Second Home Premium is structured will
also be undertaken.  
5.10 A period of public consultation is recommended to be carried out. The consultation,
to be further developed in consultation with Strategic Leadership Forum, will seek
views from members of the public on whether they agree with Scottish Government’s
policy intent; under what circumstances should qualify for discretionary relief; should
a stepped approach be adopted and under which circumstances, and are there any
unintended consequences the Council should consider before making changes. The
outcome of this consultation will be used to subsequently inform the decision-making
process on the future administration of these charges.  
Page 273

Page 274

5.11 Once points 5.6 to 5.10, inclusive, have been completed, a report will be submitted to
the Council in January 2027, accompanied by any necessary update to the Integrated
Impact Assessment report, with recommendations from officers on the administration
and level of these charges.  
6.  Summary of Implications  
6.1  The table below shows whether risks and implications apply if the recommendations
are agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  
Policy and Legal  
Financial  
Risk  
Staffing  
Best Value and Transformation  
Property  
Information Communications Technology/Digital            
Equalities. Social Inclusion and Economic Impact        
Climate Change and Biodiversity Impact   
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
The proposals support the Council Plan priorities as set out in its strategic plans.
Exploring how long-term empty properties and second homes might be brought into
permanent occupation could improve use of existing housing and contribute to
sustainable communities. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following Local
Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
6.3  Policy and Legal 
This report arises from the requirement to explore the potential impact of the introduction
on 1 April 2026 of the Council Tax (Variation for Unoccupied Dwellings) (Scotland)
Amendment Regulations 2026 on the administration of the Additional Council Tax Charge
and the Second Home Premium.  At this stage there are no direct policy implications to
this report as it facilitates the exploration of options arising from the additional powers
Page 274

Page 275

made available to the Council rather than containing proposal for defined change.  Only
once detailed proposals are considered by Council will the extent of any potential policy
implications become clear.  
6.4  Financial 
There are no direct financial implications to this report as it facilitates the exploration of
options arising from the additional powers made available to the Council rather than
containing proposal for defined change.  Only once detailed proposals are considered by
Council will the extent of any financial implications become clear 
6.5  Risk 
There are no Risk implications arising directly from this report.  
6.6  Staffing 
This report will likely result in an additional workload being placed on the Taxation Services
team to administer a consultation exercise with Additional Council Tax Charge and
Second Home Premium stakeholders.  It will be absorbed with by the existing staff of the
Team, and will not require the application of additional staffing resource.  
6.7  Best Value and Transformation 
There are no Best Value and Transformation implications arising from this report.  
6.8  Property 
There are no Property implications arising directly from this report.  
6.9  Information Communications/Technology/Digital 
There are no Information Communications/ Technology/Digital implications arising directly
from this report.  
6.10  Equalities, Social Inclusion and Economic Impact  
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
✓ ☐ ☐ ☐ ☐
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ✓ ☐
Human Rights of individuals ☐ ☐ ☐ ✓ ☐
Page 275

Page 276

Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ✓ ☐
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
An IIA has been drafted and included as Appendix 1 to this report.  It will continue to evolve
throughout the duration of the options appraisal and subsequent consultation.  Any further
information, evidence and/or feedback will further inform the content of the IIA.  
6.11  Climate Change and Biodiversity Impacts 
There are no Climate Change and Biodiversity implications arising directly from this report.   
7.  CONSULTATION  
7.1  This report has been prepared in consultation with CLT. In addition, the Elected Member
briefing session has been held to explore the various elements of the change in legislation. 
8.  BACKGROUND PAPERS  
8.1  Held within Taxation Services   
Page 276

Page 277

INTEGRATED IMPACT ASSESSMENT (IIA)
This assessment covers Equalities & Socio-Economic Duties, Human Rights & Rights of the Child (UNCRC)
Please refer to IIA Guidance for assistance completing this assessment. 
DATE
DD/MM/YY
UPDATE(S) - Add section(s) revised & brief note of revision e.g. Q.7 Public consultation data / findings added.   SHAREPOINT VERSION
DETAILS - CLT USE ONLY 
12thAugust2026 Draft IIA for consideration at Moray Council on 30 September 2026, and is completed on the basis that the
Executive director may bring forward some proposal which may result in a change in the level of the Additional
Council Tax Charge and the Second Home Premium. 
NAME OF PROPOSAL  Options for the Future Level and Administration of the Additional Council Tax Charge and Second Home Premium
STAGE 1 INITIAL SCREENING – Is the proposal a: Please ✓
New strategy, policy, project, plan, service, funding, full budget? ☐
Change to an existing strategy, policy, project, plan, service, funding, budget (including reduction / removal staff levels, hours
changed, posts)?
✓
Budget proposals? ☐
If none of the above apply, NO IIA is needed.  
If any of the above are ticked, does the proposal have the potential to affect
people from the below categories differently to the wider Moray population: 
Yes Maybe No
Positive Negative Positive Negative
Any protected characteristics individuals or groups (Equality Act 2010) ☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged individuals or groups – i.e. low / no income /
wealth or deprivation
☐ ☐ ✓ ☐ ☐
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People (UNCRC) ☐ ☐ ✓ ☐ ☐
JUSTIFICATION - Please provide a brief justification statement explaining why the above boxes have been selected 
APPENDIX 1
Page 277

Page 278

Any decision to amend the level of the Additional Council Tax Charge or the Second Home Premium may affect groups differently. Positive
impacts may arise if the policy increases the supply of homes for permanent occupation, particularly for households experiencing housing
need, affordability pressures or insecure housing. Negative impacts may arise for some liable taxpayers, including those affected by
bereavement, disability, caring responsibilities, family breakdown, employment relocation, low or fluctuating income, rurality, or difficulty
selling, renting or repairing a property. Equal administration of the premium charges does not necessarily rule out indirect discrimination,
disproportionate impact, socio-economic disadvantage or cumulative disadvantage. The IIA will remain under review as options are
developed and should be informed by consultation with affected groups and relevant evidence / data.
STAGE 1 Sign Off
Lead Officer Signature
James Taylor, Service Manager Taxation Date 16/09/20
26
Names of others involved in
STAGE 1 initial screening 
If any STAGE 1 answers above are ‘Maybe’ or ‘Negative’ please complete STAGE 2 and refer to IIA Guidance for help.  
STAGE 2 – FULL IIA
1. Please give a brief description of the current service / proposal.
2. 
The proposal to amend the level of the Additional Council Tax Charge and the level of the Second Home Premium  including charging
structures, reliefs and exemptions. Its policy aim it to increase the supply of properties as main residences.   
2. Who are the main stakeholders? E.g. Customers, staff, families, carers, partners, community groups. 
The main stakeholders affected by any proposal to change the level of the Additional Council Tax Charge and the level of the Second Home
Premium are those taxpayers who currently liable to pay Council Tax on a Second Home.  A person may have responsibility for such a
property for a number of reasons.  An additional stakeholder group is those within the Moray currently seeking to access a property as their
main residence. 
3. What changes as a result of the proposal(s)? 
Page 278

Page 279

The proposal may result in a change to the level of  the Additional Council Tax Charge and the level of the Second Home Premium; it may
result in a change to the manner in which these charges are calculated, with the extent of the unoccupied period being considered when
calculating the amount payable; and it may result in a revision to the reliefs from these charges which are available to Council Tax payers. 
4. Does the proposal affect your customers? If so, how does it affect them?  
The proposal may result in an increase in the amount of the Additional Council Tax charge and the amount of the Second Home Premium
being paid by those Council Taxpayers liable to pay them.  The proposal may also increase the number, and qualification criteria, of reliefs
available to those taxpayers liable to pay these charges. 
5. What impact will the proposal have on staff providing the service? 
The proposal will increase the workloads of the staff of the Taxation Services team, as taxpayers contact them about the extent of any change
in the levels of the Additional Council Tax charge and the Second Home Premium.  Any aspect of the proposal which increases the number
and criteria of reliefs which are available will also generate an additional workload, as taxpayers seek explanations of the revised relief
options. 
6. EVIDENCE - Please provide details / links to the information you have used for this assessment.
CONSULTATION(S) – What consultation / engagement has been carried out to inform the IIA? 
Internal consultation This assessment should be informed by internal consultation with relevant policy,
housing, homelessness, revenues, welfare rights, legal, equalities, children’s services
and anti-poverty colleagues. It should also record the evidence used, any engagement
already completed, and any evidence gaps to be addressed before final
recommendations are made. 
It should set out consultation findings, evidence used, evidence gaps, affected groups,
potential differential impacts, proposed mitigations, proportionality considerations and
monitoring arrangements. Monitoring should include uptake and refusal of discretionary
relief, hardship indicators, complaints or appeals, payment difficulty, stakeholder
Page 279

Page 280

feedback and any available equality or socio-economic information collected lawfully
and proportionately, so that Members may decide the way forward.  
Consultation with affected groups  A public consultation, which is under development, with stakeholders on the Additional
Council Tax Charge and the Second Home Premium will be carried out. It will seek public
opinion on agreement with the Scottish Government’s policy intent, comments on
entitlement to discretionary relief and the proposed adoption of a ‘stepped’ increases in
subsequent years of these charges, and if there any unintended consequences the
Council should consider.  The consultation will include affected taxpayers, residents
seeking permanent accommodation, tenants and other relevant groups to be identified. 
The feedback from this consultation will inform the decision-making process on the
future administration of these charges.
DATA – What has been used to inform the IIA?
Local Performance Data (e.g. usage
statistics) 
National statistics 
Other – Research / Best Practice / Guidance 
Evidence Gaps – Do you need any additional
information? If so, please explain.
The Taxation Services Team holds no information on the reasons why taxpayers maintain
Second Homes.  The reasons are likely to be complex and personal, resulting in little
likelihood of commonality, but attention will be given to gather background information
on this issue in the intended public consultation. 
7. EQUALITIES AND SOCIO-ECONOMIC IMPACT(S) - Please identify any impact to each group.  Please see guidance for examples.
Protected Groups –
Please use link for more
information
Positive Impact(s)  Negative Impact(s) Mitigation(s) – Practical actions/adjustments to reduce or
eliminate any negative impact(s).  What can be done to make it
fairer?
Page 280

Page 281

Age (include children,
young people, midlife
and older people)  The proposal may
have positive
impacts if it
increases the supply
of properties
available as main
residences and
supports access to
settled housing.

Potential negative
impacts should also
be considered for
older people, young
adults and families
who are liable for a
charge because of
bereavement,
relationship
breakdown, delayed
sale or rental,
employment
relocation, care
arrangements, or
difficulty managing
property repairs. 
Clear discretionary relief criteria, accessible communications,
referral to money and welfare advice, and monitoring of
applications and outcomes by age where data is available. 
Carers (for elderly,
disabled or minors)   Potential negative
impact if affected
taxpayers include
unpaid carers,
households managing
care arrangements 
Discretionary relief, flexible payment arrangements,
accessible information and signposting to advice should be
considered.
Page 281

Page 282

across more than one
property, or people
who retain a property
temporarily because
of caring
responsibilities.
Disability  
Potential negative
impact where an
empty or second
property is retained
because of
accessibility
adaptations, hospital
or care admission,
delayed adaptations,
difficulty securing
suitable housing,
bereavement, or the
need to live near
support networks. 
Accessible application routes, alternative formats, reasonable
adjustments, clear discretionary relief criteria, flexible
evidence requirements, referral to welfare and money advice,
and monitoring of relief applications and outcomes where
disability-related circumstances are disclosed.
Gender reassignment  
 No specific Impact identified 
Marriage and civil
partnership   
Page 282

Page 283

Potential negative
impact may affect
households where a
second or empty
property is linked to
temporary family
arrangements,
relationship
breakdown, domestic
abuse, relocation for
support,
Discretionary relief or phased payment where justified, referral
to housing, welfare and money advice, and consultation with
services supporting families 
Pregnancy and maternity
(including breastfeeding)     No specific Impact identified 
Race  
 No specific Impact identified 
Religion and / or belief  
 No specific Impact identified 
Sex  
 No specific Impact identified 
Sexual orientation  
 No specific Impact identified 
Page 283

Page 284

Inequalities arising from
socio-economic
disadvantage 
This proposal may be
advantageous to all
socio-economic
groups looking to buy
a house as their
main residence.

Potential negative
impact and / or
intersectionality
where protected
characteristics
combine with socio-
economic
disadvantage, rurality,
household
composition, caring
responsibilities,
disability-related
housing needs,
bereavement,
employment
relocation or difficulty
accessing advice. 
The proposal to amend the level of the Additional Council Tax
Charge and the Second Home Premium may be advantageous
to families which are unable to obtain a main residence due to
their socio-economic circumstances by increasing the supply
of properties which are available for occupation as family
homes. 
Monitoring should consider not only single protected
characteristics but patterns of cumulative disadvantage,
including whether discretionary relief is accessible to people
with limited digital access, literacy barriers, disability-related
communication needs, low income or complex circumstances
that has meant they have ownership of a Second Home. 
HUMAN RIGHTS – Please use link to see all that
may apply and add or remove below
Does proposal interfere
(limit, restrict or make it
harder to enjoy) right(s)? 
Mitigation(s) – Practical actions/adjustments to reduce /
eliminate negative impact(s).  How do we make it fairer?
Article 5 Right to liberty and security 
no
There is nothing in this proposal which affects a person’s
right to liberty or security. 
Page 284

Page 285

HUMAN RIGHTS – Please use link to see all that
may apply and add or remove below
Does proposal interfere
(limit, restrict or make it
harder to enjoy) right(s)? 
Mitigation(s) – Practical actions/adjustments to reduce /
eliminate negative impact(s).  How do we make it fairer?
Article 6 Right to a fair trial 
no
There is nothing in this proposal which affects a person’s
right to a fair trial. 
Article 8 Respect for private / family life, home
and correspondence  Yes  The proposal may interfere with Article 8 rights where
increased charges affect a person’s ability to maintain
family life, care arrangements, correspondence or a home
connected to family circumstances. Any interference
should be justified as pursuing a legitimate aim - increasing
the supply of homes for permanent occupation and
supporting sustainable communities. Proportionality
should be demonstrated through clear criteria,
consultation, accessible discretionary relief, flexible
payment arrangements, reasonable adjustments,
signposting to advice, transparent decision-making and
review or appeal routes.
Article 10 Freedom of expression 
no
There is nothing in this proposal which affects a person’s
right to freedom of expression. 
Article 11 Freedom of assembly and association 
no
There is nothing in this proposal which affects a person’s
right to freedom of assembly and association. 
Article 14 non-discrimination 
No
No direct discrimination has been identified at this stage,
but the assessment should consider whether the policy
could create indirect or cumulative disadvantage for people
Page 285

Page 286

HUMAN RIGHTS – Please use link to see all that
may apply and add or remove below
Does proposal interfere
(limit, restrict or make it
harder to enjoy) right(s)? 
Mitigation(s) – Practical actions/adjustments to reduce /
eliminate negative impact(s).  How do we make it fairer?
who share protected characteristics, particularly where
those characteristics intersect with low income, disability,
caring responsibilities, bereavement, family breakdown,
rurality or limited access to advice. Mitigations as above. 
Protocol 1, Article 1- Right to peaceful
enjoyment of property  Yes  The proposal may interfere with Protocol 1, Article 1
because some taxpayers who own or hold a long-term lease
of a long-term empty property or second home may pay an
increased amount of Council Tax. Proportionality should be
supported by clear published criteria, consultation,
discretionary relief for exceptional circumstances,
consideration of ability to pay where relevant, flexible
payment arrangements, transparent decision-making,
review routes and monitoring of hardship or unintended
consequences.
Protocol 1, Article 2 - Right to education 
no
There is nothing in this proposal which affects a person’s
right to education. 
RIGHTS OF CHILDREN & YOUNG PEOPLE (UNCRC)
Please use link to identify all that apply and add
below
How does proposal
interfere with rights?
Mitigation(s) – Practical actions/adjustments to reduce /
eliminate negative impact(s).  How do we make it fairer?
Page 286

Page 287

(limit, restrict or make it
harder to enjoy)
Article 2 – Non discrimination 
No
There is nothing in this proposal which discriminates against
children as they are not taxpayers. 
Article 3 – Best Interest of a Child 
No
There is nothing in this proposal which impacts the best
interest of children as they are not taxpayers. 
Article 6 – Right to life, survival and development 
No
There is nothing in this proposal which impacts on the right
to life, survival or development of children. 
Article 12 – Respect the views of the child 
No 
There is nothing in this proposal which impacts children as
they are not taxpayers.
Article 23 – Children with a disability 
No
There is nothing in this proposal which disadvantages
children with a disability. 
8. Justification – Show balanced consideration of any impacts / lack of mitigations against the proposal need / outcome.   E.g. Is it
considered proportionate, appropriate, necessary and / or unavoidable i.e. overriding public benefit. 
Some potential negative impacts have been found that can be fully mitigated.  They may be justified as follows:
• The proposal to amend the level of the Additional Council Tax Charge and the Second Home Premium is part of the council’s
strategy to increase the number of properties which are available for occupation as main residences.  This policy may result in the
increase in Council Tax charges for some taxpayers, but this is to be set against the advantages to the wider community of
increasing the housing stock and can be justified by the legitimate public interest objective of increasing homes available for
permanent occupation which supports sustainable communities. 
STAGE 3 – IMPACT SUMMARY Please Tick (√)
Page 287

Page 288

Negative Impacts Identified 
• Can be mitigated and justified (Q7 above)  ☐
• Cannot be fully mitigated, but are justified (Q8 above) ☐
• Cannot be fully mitigated nor justified (Q7 & Q8 above) ☐
The proposals interfere with Human Rights and /or the Rights of the Child ☐
Further consultation with affected groups is needed ☐
It is advised not to go ahead with the proposals ☐
FINAL DECISION – Include any Committee / Board recommendations and /or rationale for approving proposal or not.
The proposal will be presented to <insert name of Committee / Board> on <insert date of Committee> for consideration and / or final decision
on whether to proceed with the proposal or not.
Committee / Board Final Decision – 
FINAL AUTHORISATION / SIGN OFF - Final IIAs will be published to www.moray.gov.uk/IIAs at point of final decision.
Service  Dept.  Permission
to Publish
☐
IIA Completed
By
Name   Date 
Position 
Signed off by
Head of Service
Name  Date 
Page 288

Page 289

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Education, Housing and Communities      
Author: Kim Slater Contact Email: kim.slater@moray.gov.uk 
Subject: Wider After School Activities Proposal Update 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to note that the Council have formally received a grant offer
following the Wider After School Activities funding proposal submitted to the Scottish
Government in May.  The report is also seeking approval of the emerging approach and
governance arrangements identified for this programme.  
1.2  This report is submitted to Council in terms of Section III (D) (20) of the Council’s Scheme
of Administration regarding provision of facilities and support activities related to the
development of recreation, sport, culture and social activities.  
2.  SUMMARY  
2.1  The Council is one of six local authorities to receive Scottish Government funding to test
new approaches to accessible and affordable after-school activities for primary school
children. The Council is set to receive up to £1.6 million to develop locally tailored activity
provision, initially in Buckie and Forres, aimed at supporting children and families living in,
or most at risk of, poverty. The programme will help widen access to safe, inclusive and
engaging activities, support children’s health and wellbeing, and reduce barriers that can
prevent parents and carers from entering employment, increasing working hours,
undertaking training or sustaining work. Delivery will be developed with communities, third
sector, voluntary and other local partners, with learning from the initial phase used to
shape future provision and potential wider roll-out across Moray.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Council:   
i)  Notes the grant offer of up to £1.6 million that has resulted from the Wider
After School Activities funding proposal made to the Scottish Government
and the preparatory work progressed to date;
Item 16.
Page 289

Page 290

ii)  Agrees to the governance arrangements identified in the report to monitor
and develop the programme, including that the project sits within the Leisure
and Culture Service;   
iii)  Agrees to the emerging objectives and approach as set out in the report
which takes a phased approach to developing services across Moray for the
targeted groups; and 
iv)  Notes that the service options considered will be contained within the
allocated funding and will be developed with a view to, as far as possible,
creating a sustainable service for the long term that addresses the priority of
supporting parents into and to remain in work.   
Kim Slater
Service Manager Leisure and Culture 
4.  BACKGROUND AND CONTEXT  
4.1  At the meeting of the Education, Children’s and Leisure Services Committee on 23 June
2026 (para 9 of the minute refers), the Committee agreed to progress work to develop
service options to deliver a pilot scheme providing Wider After School Activities to
facilitate access to increase employment and training for parents if a funding proposal to
the Scottish Government was approved.  It was also agreed that if successful this
proposal would sit within the Leisure and Culture Service and Council is asked to endorse
this now that funding is confirmed.  
4.2  On 29 June 2026, the Council received a letter providing provisional notification of Scottish
Government funding in relation to the Wider After School Activities proposal.  Moray is one
of six Local Authorities accessing this funding to test different activity provision.  The
programme will test a range of approaches so that delivery can reflect the needs of
different communities. Some models may prove effective, while others may need to be
adapted or discontinued before longer-term solutions are established on the ground.  
4.3  On 11 August 2026, the Council received the formal grant letter from Scottish Government
which is available as a background paper.  The grant will fund the development and
delivery of locally tailored after-school activity programmes, initially in Buckie and Forres,
providing targeted primary school children, particularly those experiencing poverty or at
risk of poverty, with access to a safe, inclusive and engaging range of activities during term
time. The programmes will be designed in partnership with local communities and delivery
partners, complement existing services, support children’s health, wellbeing and
development, provide healthy food and safe transport where required, and contribute to
reducing barriers faced by low-income families.  The intention is to roll-out the programme
further across Moray after the initial development and delivery focus in Buckie and Forres. 
Preparatory Work
4.4  Since receiving the provisional notification letter on the 29 June 2026 the following
preparatory activity has progressed;
- Recruitment process for a Lead Officer, Project Officer and Administrator is in
progress.
Page 290

Page 291

- A Project Board has been established with representation from Finance,
Employability, Estates, Benefits and Money Advice, Strategy and Performance,
Transportation and Leisure and Culture.
- A draft business and delivery plan was created and submitted to the Scottish
Government.  This plan is now being updated to reflect the requirements contained
in the formal grant letter.
- Investigative work in regards to commissioning, subsidy control, provider capacity
and market development have been ongoing.
- Early areas for exploration have been identified and are in progress in the West of
Moray. 
Objectives and Approach
4.5  The programme will test, analyse and report on how organised activities for targeted
primary school children, can improve outcomes for families on low incomes, with a
particular focus on; 
Improved outcomes for children
- Increase in the number of children accessing after school activity clubs
- Increased engagement in activities in sports and physical activities
- Improved health and wellbeing opportunities
Improved outcomes for families
- Increased number of families have access to reliable after school activities
- Improving outcomes for children and their families by removing or mitigating
barriers to earned income
Improved outcomes to support the Scottish Government
- Improved identification and assessment of the challenges and opportunities
presented by after-school activities provision
- Increased evidence base surrounding activities provision, to support
understanding of a potential future national childcare offer. 
4.6  The programme will adopt a place-based approach, recognising that communities across
Moray have different strengths, priorities and existing provision.  Rather than delivering a
single model across the region, activities will be developed in partnership with local
communities to ensure provision reflects local needs, existing assets and opportunities. 
4.7  A particular focus of this programme will be on targeting the six priority family types (as
identified in the Bringing Hope, Building Futures: Tackling Child Poverty Delivery Plan 2026-
2013).  These family types include: 
- Lone parent families
- Minority ethnic families
- Families with a disabled person
- Families with a mother aged 25 or under
- Families with a child under 1yr
- Families with three or more children 
Delivery and Areas for Testing
4.8  The programme will be delivered through a phased and evidence-led approach. This
approach recognises that Moray’s geography, existing provision, transport constraints,
Page 291

Page 292

workforce capacity and levels of family need vary across communities, and that a single
delivery model is unlikely to be appropriate in every locality. 
4.9  The next phase will therefore focus on safe mobilisation and structured testing rather than
assuming a fixed final model at this stage. Key areas to be developed and tested include
local demand and eligibility, affordability for families, pricing and subsidy options, provider
capacity and market interest, use of Council and community premises, transport
solutions, staffing requirements, quality assurance, safeguarding, commissioning routes
and the potential contribution of community, voluntary and private sector partners.   The
pace of change will be managed through the programme governance arrangements. 
4.10  The appointed Lead Officer will commence in the role imminently therefore traction on
small scale mobilisation is anticipated during the October to December school term. 
Governance Arrangements
4.11  The proposed governance arrangements for this programme will involve programme staff
to deliver the project and services, a Project Board for planning, tracking and guiding the
programme delivery, the Transform Board for oversight and direction and reporting
updates to the Education, Children’s and Leisure Services Committee. 
4.12  Update reports will also be shared with the Scottish Government in line with required
reporting. A working group will be established by Scottish Government across the six local
authorities receiving funding to share best practice and lessons learned throughout the
duration of the programme. 
5.  PROPOSALS  
5.1  The proposal is to welcome and note the successful outcome of the Wider After School
Activities funding proposal to the Scottish Government and the receipt of grant funding of
up to £1.6 million. This funding provides a significant opportunity for Moray Council to
respond to identified local need by testing after-school activity provision that supports
children and families, reduces inequalities of access, and helps overcome barriers that
can prevent parents and carers from entering employment, increasing working hours,
undertaking training or sustaining work. The programme will focus initially on Buckie and
Forres, with a phased approach that enables models to be tested, adapted and evaluated
before decisions are taken on wider roll-out across Moray.  
5.2  The proposal is also to agree the emerging governance arrangements, objectives and
delivery approach for the programme. The next phase will focus on safe and timely
mobilisation, including recruitment to key posts, continued engagement with
communities and delivery partners, market and provider development, development of
pricing and subsidy options, identification of suitable premises and transport solutions,
and refinement of the business and delivery plan. The intended pace of change is to move
quickly enough to make early use of the funding and begin testing delivery models during
the grant period, while ensuring that decisions remain evidence-based, affordable, legally
compliant and subject to appropriate governance oversight. 
5.3  The programme will be delivered through a partnership approach, involving community,
voluntary, third sector and other local providers where appropriate. It is focused on wider
after-school activities rather than regulated childcare and aims to complement childcare
Page 292

Page 293

provision and help reduce barriers for parents and carers accessing work, training or
increased hours. 
A performance and evaluation framework will be developed to provide assurance on
delivery, impact and value. While detailed measures are still to be confirmed, these will
consider uptake, access for targeted families, quality and safety, provider capacity,
affordability, impact on children and families, and contribution to reducing barriers to
employment or training. Delivery will be reviewed regularly so that learning can inform
changes to the model as the programme develops.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) x 
Policy and Legal  x
Financial x 
Risk  x
Staffing x 
Best Value and Transformation x 
Property x 
Information Communications Technology/Digital              x
Equalities. Social Inclusion and Economic Impact             x 
Climate Change and Biodiversity Impact  x 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council assesses support for economic development initiatives on their individual
Page 293

Page 294

merits, guided by the objectives of facilitating sustainable economic growth and achieving
the outcomes set out in the Moray LOIP and Corporate Plan.    
6.4  Financial 
The Scottish Government has allocated up to £1.6million payable over financial years 1
August 2026 to 31 March 2028.  The value of the grant payable in year 2 (2027/28) is an
indicative confirmation and cannot be taken as a guarantee: all indicative funding
commitments are subject to the outcome of any spending review by the Scottish
Government and approval of the annual Budget Bills by the Scottish Parliament during
this period.  It is unknown whether future funding to support this programme objectives
will continue post March 2028.  Overhead costs, including back office functions, ICT
equipment, management support and office space will be charged to the project to
ensure no Council revenue pressure is created. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments
Leisure &
Culture
Up to
£1.6million 
1 Aug 2026
– 31 March
2028
Up to
£800k
between
Aug-end of
Mar 27
Scottish
Government 
6.5  Risk 
The programme is being developed within a challenging delivery context, including
uncertainty about long-term sustainability, affordability for families, provider capacity,
rural delivery, premises, transport and the pace at which delivery can safely be mobilised.
These matters are recognised as key areas to be tested through the grant-funded
programme and are reflected earlier in the report and in the business/delivery plan. The
principal risk is that a sustainable longer-term model may not be identified before the end
of the grant period. This will be managed through phased delivery, clear governance,
financial modelling, market engagement, evaluation and regular reporting to ensure that
any future recommendations are evidence-based and do not create an unfunded Council
commitment.  
6.6  Staffing 
New staffing posts are being created to develop and implement this programme.  The first
3 positions are currently progressing through the recruitment process.  Further posts will
be identified as and when the need is identified.  Back office support have been identified
and costs will be associated with this to ensure no Council revenue pressure is created. 
The responsibilities of the post of Service Manager (Leisure and Culture) are also being
updated to reflect the temporary additional duties and responsibilities and to ensure that
these are appropriately reflected in the grading and remuneration applied to the post.   
All staffing arrangements are accommodated within the project funding.  
Page 294

Page 295

6.7  Best Value and Transformation 
The use of external grant funding supports Best Value by enabling the Council to deliver
priorities around child poverty, employability, education and community wellbeing without
placing additional pressure on core budgets.  This external grant funding is an opportunity
to test new approaches that can help transform the employability capacity of our local
residents.  
6.8  Property 
This programme may require the utilisation of Council assets from the learning, leisure
and culture estates for delivery purposes.  All arrangements will be agreed in advance with
new protocol identified in regards to this additional utilisation of the estate.  
6.9  Information Communications/Technology/Digital 
New staff will require to access ICT equipment and mobile phone as standard practice to
fulfil their roles.  There will be no other implications from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
An integrated impact assessment is set out in Appendix 1.  This document will be updated
throughout the duration of this project to ensure barriers connected to categories
identified in the below table are identified and addressed.  
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
✓ ☐ ☐ ☐ ☐
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
✓ ☐ ☐ ☐ ☐
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
✓ ☐ ☐ ☐ ☐
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
While the aim of this programme is focused on improving the health and wellbeing of
certain protected characteristic individuals/groups, those socio-economically
disadvantaged as well as supporting the rights of Moray’s children and young people, the
attached IIA identifies the need to consider the wider context of low income households
use of these activities
Page 295

Page 296

6.11  Climate Change and Biodiversity Impacts
There are no climate change or biodiversity implications connected to this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Chief Governance Officer (Monitoring
Officer), Chief Financial Officer, Head of Growth, Planning and Climate, Head of Education
(Chief Education Officer), Equalities Officer and Service Manager Democratic Services
and any comments made have been incorporated into the report.   
8.  BACKGROUND PAPERS  
8.1  Scottish Government Offer of Grant Letter   
Page 296

Page 297

APPENDIX 1 
INTEGRATED IMPACT ASSESSMENT (IIA)
This assessment covers Equalities & Socio-Economic Duties, Human Rights & Rights of the Child (UNCRC)
Please refer to IIA Guidance for assistance completing this assessment. 
DATE
DD/MM/YY
UPDATE(S) - Add section(s) revised & brief note of revision e.g. Q.7 Public consultation data / findings added.   SHAREPOINT VERSION
DETAILS - CLT USE ONLY 
04/09/2026 Initial completion of relevant sections 
NAME OF PROPOSAL  Wider After School Activities Project 
STAGE 1 INITIAL SCREENING – Is the proposal a: Please ✓
New strategy, policy, project, plan, service, funding, full budget? ✓
Change to an existing strategy, policy, project, plan, service, funding, budget (including reduction / removal staff levels, hours
changed, posts)?
☐
Budget proposals? ☐
If none of the above apply, NO IIA is needed.  
If any of the above are ticked, does the proposal have the potential to affect
people from the below categories differently to the wider Moray population: 
Yes Maybe No
Positive Negative Positive Negative
Any protected characteristics individuals or groups (Equality Act 2010) ✓ ☐ ☐ ☐ ☐
Any socio-economic disadvantaged individuals or groups – i.e. low / no income /
wealth or deprivation
✓ ☐ ☐ ✓ ☐
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People (UNCRC) ✓ ☐ ☐ ☐ ☐
JUSTIFICATION - Please provide a brief justification statement explaining why the above boxes have been selected 
The Committee report has clear positive equalities implications. It is designed to widen access to affordable after-school activities for
targeted primary school children and families experiencing, or at risk of, poverty. It specifically references priority family groups, including
lone parent families, minority ethnic families, families with a disabled person, young mothers, families with very young children, and larger
families. 
While the programme is not claiming that activities are equivalent to, or a replacement for, regulated childcare, the following applies::
Page 297

Page 298

10
V1 – Last Updated 2 July 2026
• Positive impact on protected characteristic groups: particularly disabled people, minority ethnic families, younger mothers,
children and families who may face additional barriers to accessing activities, childcare-style support, employment or training.
• While there are clear positive socio-economic impact from the proposal being directly aimed at reducing poverty-related barriers by
improving access to affordable, reliable after-school activities and supporting parents/carers to enter, remain in, or increase work or
training, certain mitigations need considered to ensure no inequality is created around reliance on activities over regulated care.
• Positive impact on children’s rights and wellbeing: the programme should support children’s health, wellbeing, participation,
inclusion and access to safe, structured activities.
• Potential access risks to manage: rurality, transport, affordability, eligibility criteria, disability access, cultural appropriateness, and
availability of provision across different localities will need to be tested and monitored.
• No obvious negative equalities impact are identified at this stage.  The phased delivery and evaluation framework will monitor
uptake and outcomes across priority groups to ensure barriers are identified and addressed. 
This integrated impact assessment will continue to be updated throughout the duration of this new project to ensure that the protected
characteristics stated above are not negatively impacted by this project and to ensure barriers are addressed wherever possible as they
arise. 
STAGE 1 Sign Off
Lead Officer Signature
Kim Slater Date 04/09/20
26
Names of others involved in
STAGE 1 initial screening
Equalities Officer 
If any STAGE 1 answers above are ‘Maybe’ or ‘Negative’ please complete STAGE 2 and refer to IIA Guidance for help.  
STAGE 2 – FULL IIA
1. Please give a brief description of the current service / proposal.
Wider After School Activities Project 
2. Who are the main stakeholders? E.g. Customers, staff, families, carers, partners, community groups. 
Low income households 
3. What changes as a result of the proposal(s)? 
More children receive after school activities than may otherwise be able to afford them which enables parents to work.
Page 298

Page 299

11
V1 – Last Updated 2 July 2026 
4. Does the proposal affect your customers? If so, how does it affect them?  
Supports low-income households through the provision of after school activities.   
5. What impact will the proposal have on staff providing the service? 
Staff / providers will need to be commissioned with agreements in place around training and safeguarding. 
6. EVIDENCE - Please provide details / links to the information you have used for this assessment.
CONSULTATION(S) – What consultation / engagement has been carried out to inform the IIA? 
Internal consultation 
Consultation with affected groups  
DATA – What has been used to inform the IIA?
Local Performance Data (e.g. usage
statistics) 
National statistics 
Other – Research / Best Practice / Guidance 
Evidence Gaps – Do you need any additional
information? If so, please explain. 
7. EQUALITIES AND SOCIO-ECONOMIC IMPACT(S) - Please identify any impact to each group.  Please see guidance for examples.
Protected Groups –
Please use link for more
information
Positive Impact(s)  Negative Impact(s) Mitigation(s) – Practical actions/adjustments to reduce or
eliminate any negative impact(s).  What can be done to make it
fairer?
Age (include children,
young people, midlife
and older people)
Yes  
Carers (for elderly,
disabled or minors)
Yes  
Disability Yes  
Page 299

Page 300

12
V1 – Last Updated 2 July 2026 
Gender reassignment Yes  
Marriage and civil
partnership   
Pregnancy and maternity
(including breastfeeding)   
Race Yes  
Religion and / or belief Yes  
Sex Yes  
Sexual orientation   
Inequalities arising from
socio-economic
disadvantage
Yes Potential impact /
inequalities arising
from differences in
families’ ability to
access regulated
childcare. Families on
lower incomes may
have fewer affordable
childcare options and
may therefore rely
more heavily on
school-based or
organised after-school
activities where these
are available.  This
presents a potential
risk due to less choice
over the type and
After-school provision undoubtedly plays an important role in
supporting children and families, however it may not provide
the same level of regulatory oversight, flexibility or range of
provision as regulated childcare. 
The Wider After School Activities Project
will consider this as part of its commissioning responsibilities
to ensure providers are trained professionals with
commitments to provision that is genuinely accessible,
affordable, safe and appropriate to eliminate any risk through
the use of the programme being relied on by families
experiencing low income / poverty.
Page 300

Page 301

13
V1 – Last Updated 2 July 2026
quality of provision
available to them than
children whose
families are able to
access and afford
regulated childcare. 
HUMAN RIGHTS – Please use link to see all that
may apply and add or remove below
Does proposal interfere
(limit, restrict or make it
harder to enjoy) right(s)? 
Mitigation(s) – Practical actions/adjustments to reduce /
eliminate negative impact(s).  How do we make it fairer?
Article 5 Right to liberty and security  
Article 6 Right to a fair trial  
Article 8 Respect for private / family life, home
and correspondence  
Article 10 Freedom of expression  
Article 11 Freedom of assembly and association  
Article 14 Non-discrimination  
Protocol 1, Article 1- Right to peaceful
enjoyment of property  
Protocol 1, Article 2 - Right to education   
RIGHTS OF CHILDREN & YOUNG PEOPLE (UNCRC)
Please use link to identify all that apply and add
below
How does proposal
interfere with rights?
(limit, restrict or make it
harder to enjoy)
Mitigation(s) – Practical actions/adjustments to reduce /
eliminate negative impact(s).  How do we make it fairer?
Article 2 – Non discrimination  
Article 3 – Best Interest of a Child  
Article 6 – Right to life, survival and development  
Article 12 – Respect the views of the child  
Article 23 – Children with a disability   
8. Justification – Show balanced consideration of any impacts / lack of mitigations against the proposal need / outcome.   E.g. Is iit
considered proportionate, appropriate, necessary and / or unavoidable i.e. overriding public benefit. 
Page 301

Page 302

14
V1 – Last Updated 2 July 2026
Some negative impacts have been found that cannot be fully mitigated, but they can be justified as follows:
The programme will recognise that families on low incomes may be less able to access regulated childcare where provision is unavailable,
unaffordable or does not meet their needs. In these circumstances, school-based and wider after-school activities may be relied upon as
an important source of safe provision for children beyond the school day. The programme will therefore consider whether the availability,
affordability and accessibility of after-school activities can help mitigate childcare barriers for families experiencing poverty, while
recognising that such activities are not intended to replace regulated childcare. 
STAGE 3 – IMPACT SUMMARY Please Tick (√)
Negative Impacts Identified 
• Can be mitigated and justified (Q7 above)  ✓
• Cannot be fully mitigated, but are justified (Q8 above) ☐
• Cannot be fully mitigated nor justified (Q7 & Q8 above) ☐
The proposals interfere with Human Rights and /or the Rights of the Child ☐
Further consultation with affected groups is needed ☐
It is advised not to go ahead with the proposals ☐
FINAL DECISION – Include any Committee / Board recommendations and /or rationale for approving proposal or not.
The proposal will be presented to <insert name of Committee / Board> on <insert date of Committee> for consideration and / or final decision
on whether to proceed with the proposal or not.
Committee / Board Final Decision – 
FINAL AUTHORISATION / SIGN OFF - Final IIAs will be published to www.moray.gov.uk/IIAs at point of final decision.
Service Leisure & Culture Dept. Education, Housing &
Communities 
Permission
to Publish
✓
IIA Completed
By
Name  Kim Slater Date 04/09/2026
Position Service Manager Leisure and Culture
Page 302

Page 303

15
V1 – Last Updated 2 July 2026
Signed off by
Head of Service
Name  Date 
Page 303

Page 304

Page 304

Page 305

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Alasdair McEachan Contact
Email:
alasdair.mceachan@moray.gov.uk 
Subject: Meeting Attendance Protocol 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider and approve the changes to the Meeting
Attendance Protocol following the Councillors workshop held on 13 April 2026.  
1.2  This report is submitted to Council in terms of Section III (B) (6) of the Council’s Scheme of
Administration relating to a new policy matter which does not fall within the terms of
reference for any other Committee.  
2.  SUMMARY  
2.1  The Meeting Attendance Protocol was brought before the meeting of Moray Council on 3
December 2025 for consideration and agreement. (para 15 of the minute refers)  
2.2 Following consideration at the meeting it was agreed to defer consideration of the report to
allow a Member’s workshop to be held and for the report to come back to a future meeting
for consideration.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Council consider and approve: 
i) the revised Meeting Attendance Protocol contained in Appendix 1; and   
ii) the Copyright and Re-use Licence Statement contained in Appendix 2   
Alasdair McEachan
Chief Governance Officer 
4.  BACKGROUND AND CONTEXT  
Item 17.
Page 305

Page 306

4.1  The Remote/Hybrid Meeting Protocol was agreed at the meeting of Moray Council on 29
June 2022 (para 17 of the minute refers).  
4.2  As agreed at the meeting of Moray Council on 3 December 2025, a Members Workshop
was arranged and held on 13 April 2026 to allow a deeper discussion on the Meeting
Attendance Protocol. 
4.3  A number of issues were discussed at the workshop including:
• Whether cameras should be kept on or off
• Transparency for when councillors arrive late of leave early.
• Assurance of confidentiality for confidential items
• Use of devices during the meeting to email, text, post and research. 
• Potential for internet connected devices to be “listening in”. 
4.4  Although consensus was not reached on every issue, the discussion was useful. Based on
this discussion, a revised draft of the Protocol is attached at Appendix 1 for approval, with
amendments in the following areas:
• Revised position on web cameras:  cameras on when speaking
• Text for the Chair to read out when entering confidential section of meeting
• Provisions around use of the chat function
• Provisions around use of devices during meetings
• Provision for breakout discussion 
4.5  Another issue discussed at the workshop was re-use of webcast footage. Currently the
Council has a copyright statement with a blanket restriction on re-use of webcast footage. 
Although there was acknowledgement that there is general public interest in re-use of
archived webcast clips, workshop participants agreed that there should be conditions
placed on re-use to mitigate against manipulation, misrepresentation and defamation.   
The draft Webcast Copyright and re-use licence statement contained in Appendix 2 aims
to strike a balance between this public interest and the protection of individual rights with
the following restrictions on re-use: 
• acknowledge the Council as the source of the footage; 
• not edit, crop, dub, subtitle, manipulate or combine the footage in a manner that
alters its meaning or misrepresents the words or actions of any participant; 
• not present excerpts in a misleading, false or defamatory context; 
• not imply Council endorsement of any individual, organisation, political party,
campaign or viewpoint; 
• ensure that any excerpt is accompanied by sufficient contextual information to
allow a fair understanding of the proceedings; 
• not use artificial intelligence, synthetic media or other technologies to alter the
appearance, voice or meaning of the recording; 
Page 306

Page 307

• comply with applicable data protection, equality and electoral laws 
5.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  x
Policy and Legal x 
Financial  x
Risk  x
Staffing  x
Best Value and Transformation  x
Property  x
Information Communications Technology/Digital            x
Equalities. Social Inclusion and Economic Impact              x 
Climate Change and Biodiversity Impact  x 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
n/a   
6.3  Policy and Legal 
It is proposed that the Protocol would complement the Council’s Standing Orders.  
6.4  Financial 
n/a
6.5  Risk 
Improved transparency of decision making, and clarity over re-use of webcast material
both have potential to improve the Council’s reputation, reducing reputational risk. 
6.6  Staffing 
n/a  
6.7  Best Value and Transformation 
n/a  
6.8  Property 
n/a  
6.9  Information Communications/Technology/Digital 
n/a 
6.10  Equalities, Social Inclusion and Economic Impact
Page 307

Page 308

The attached IIA (Appendix 3) identifies: 
• A benefit that online meetings can help remove barriers to people taking up public
office.
• Concerns expressed over a requirement for cameras to be kept on can be
addressed by not making this a mandatory requirement. 
6.11  Climate Change and Biodiversity Impacts 
Facilitating online meetings can help reduce carbon footprint by reducing the need for
travel. 
6.  CONSULTATION  
7.1  This report has been prepared in consultation with members of the Corporate Leadership
team and the Strategic Leadership Forum. Comments made have been incorporated into
the report. 
7.  BACKGROUND PAPERS  
8.1  Report to Moray Council on 29 June 2022 (para 17 of the minute refers).   
Page 308

Page 309

APPENDIX 1 
MEETING ATTENDANCE PROTOCOL  
PURPOSE OF THIS PROTOCOL 
The Council’s Standing Orders detail procedures for the conduct of Council
meetings. 
With advances in technology the Council can choose to hold meetings in person,
remotely via online participation, or a mixture of both.   
Meetings with online participation present additional challenges in terms of
meeting governance and further guidance is considered helpful to address these
challenges. 
This Protocol is designed to provide that guidance and to set out in expectations in 
relation to meetings more generally and is intended to complement the procedures
in the Standing Orders. 
AT LEAST THE DAY BEFORE THE MEETING 
1 Pre-meeting Committee Services will arrange a pre-meeting with
the Chair and Vice-Chair where appropriate to go
through the agenda to identify any pertinent issues
arising from the meeting agenda, any written
questions or Notices of Motion received and identify
which Officers will be responding to questions on
reports if required. 
The Committee Clerk and Chair may consider
whether any preliminary remarks are required,
beyond those noted below. 
The Clerk will ensure that first-time participants have
been offered an induction session for using the
Council’s agreed online meetings system.
2 Joining meeting and
access to papers
Online attendees should contact Committee
Services if they need advice on joining the meeting,
using the Council’s online meeting system or
accessing papers.
3 Pre-notification of
interests
Councillors are invited to inform the Clerk of any
interests being declared, where these require them to
Page 309

Page 310

withdraw from discussion of the relevant item, to help
the Clerk prepare for the meeting.
4 Substitutes Online attendees are reminded to inform the Clerk of
substitutes attending, where permitted, to allow the
online meeting invitation to be sent.
5 Fair notice of
motions/amendments
Where a Councillor wishes to put forward a motion or
amendment which differs significantly from the
recommendations within a report on the agenda, or
which is long, they are encouraged to provide a
written copy of the proposal to the Clerk by 9.00am
on the day of the meeting.   
For any amendment which requires consideration by
Officers as to deliverability and/or competency, it is
helpful to provide a written copy to the Clerk by 2pm
the day before the meeting to ensure that time is
available for advice to be provided by officers before
the meeting begins. 
Provided the motion or amendment meets
competency requirements, the Clerk will circulate it
amongst Council or Committee Councillors with the
consent of the proposer. The Clerk may also circulate
any available advice. 
Where a motion or amendment which is a significant
departure from agenda report recommendations is
raised during a meeting, there is a risk that it may be
deemed incompetent by the Chair in terms of
Standing Order 35 due to lack of fair notice. 
Notes:
• Advance notice of a motion or amendment
may not be possible with urgent or last-minute
agenda items.
• Even if advance notice has been given, there
will still be an opportunity to raise further
changes to motions or amendments at
meetings.
• Advance notice provisions in this paragraph
are not intended to alter any special
arrangements put in place for dealing with the
Annual Budget Setting meeting contained in
the Budget Setting Protocol.
6 Advance notice of
questions
Councillors are encouraged to raise factual questions
with Officers in advance of a meeting. This helps
make the best use of committee time. 
Page 310

Page 311

Advance notification of questions can help ensure
that better quality answers can be provided at the
meeting. 
Councillors can also use the written questions
procedure within Standing Order 36.
7 Presentation material Any presentation material should be provided to the
Clerk the day before the meeting so that it can be
circulated to Councillors prior to the meeting. 
JOINING THE MEETING 
1 Joining the meeting
on time
Online attendees are invited to join the meeting at
least fifteen minutes before the meeting is due to start
and to ensure that video and audio is selected and
switched on. All present should mute audio until
invited to speak by the Chair. 
All attendees should be aware that the meeting will be
webcast live over the internet and be mindful of their
surroundings, particularly as most will likely be joining
the meeting from their own home.   
If there are other people in the home, they should be
made aware that you will be filmed. This is particularly
important if there are children/young adults in the
household as the footage will be archived and
available for public viewing for 12 months following
the meeting. 
Online attendees are encouraged to use an agreed
corporate background during meetings. 
Councillor should, where possible, use Council
provided equipment for joining meetings.   
Meeting details should not be forwarded outside the
Council’s network (i.e. not to personal email
addresses) as the appointments may contain private
or sensitive information. 
2 Chair  For hybrid meetings it is expected that the Chair will
be physically present in the meeting. 
For a fully on-line meeting all Councillors of the
meeting will join remotely including the Chair. 
3 Equipment check The Clerk will welcome those joining the meeting
remotely and test that cameras and microphones are
working.  
Page 311

Page 312

The Clerk will remind online attendees to mute
microphones when not addressing the meeting and
may actively mute a microphone inadvertently left on.   
The Clerk will confirm to the Chair when all
Councillors are present. 
Councillors are reminded to check that their device is
fully charged or is connected to an electricity supply. 
4 Other joining
considerations
Councillors are reminded to find a suitable location
for the meeting, where they will be comfortable and
will not be disturbed. 
Smart speakers, such as Amazon Echo (Alexa),
Google Home or smart music devices, may be
recording phone or video conversations and this could
be an inadvertent breach of privacy. 
It is strongly advised that any such device that
connects to the internet should be turned off or
moved out of the place in which you are working. This
is particularly important for meetings that include
exempt or confidential items. 
For confidential items, the Chair may require online
attendees to confirm that they are attending the
meeting from a confidential space. 
START OF THE MEETING 
1 Welcome and
formalities
In welcoming meeting participants, the Chair shall give
the following advisory notes: 
• Reminder of live webcast
• Reminder to all online attendees to have their
cameras turned on when addressing the
meeting. 
• Reminder to all participants not to speak during
items unless invited by the Chair.
• If online attendees wish to speak, they should let
the meeting know by raising the electronic hand
on-screen (or for those in attendance raise their
hand)
• If an online attendee Councillor loses
connection or has any technical issues during
the meeting, they should alert:
committee.services@moray.gov.uk 
or 
Page 312

Page 313

01343 563164 
A Committee Services Officer will provide assistance. 
Councillors are reminded not to email or call the Clerk
in the meeting as they may not pick up the email or call
until it is too late.  We may not be able to halt the
meeting if a Councillor loses connection. 
ORDER OF BUSINESS 
The order of business shall proceed as set out in Standing Orders and shall include:
1 Roll Call  The Clerk shall take the Sederunt by roll call. 
2 Introductory The Chair shall deal with:- 
• Other introductory remarks, if any
• Urgent business, if any
• Re-order reports if appropriate 
3 Declarations of
Interest 
As normal
4 Resolution As normal 
5 Minutes As normal 
DURING THE MEETING 
1 Cameras and audio Online attendees shall have their cameras on whilst
speaking. 
2 Declaration of
interest
Where a Councillor has declared an interest in the item
they should withdraw from the discussion and leave the
Chamber or disconnect from the meeting. 
The Chair will advise the Councillor that they may re-
join after conclusion of the affected item of business. 
This applies to both in person and remote attendees. 
For online attendees, an email will be sent to the
Councillor advising that they can rejoin the meeting. 
Where a Councillor has made a transparency
statement, the requirement to leave the meeting is not
required. 
Page 313

Page 314

3 Meeting
proceedings
The Chair will 
• conduct proceedings as usual in accordance
with Standing Orders and any committee-
specific procedures 
• Pause and delay if necessary to ensure efficient
meeting and participation by all 
• When moving between procedural stages ask if
all Councillors have spoken who wished to do so 
• Pause and adjourn for a short time if procedural
or legal advice is required, explaining and
ensuring all microphones are muted and
cameras off before doing so. 
4 Use of “hands up”
sign
The Clerk will assist the Chair in identifying Councillors
wishing to speak by monitoring ‘hands up’ signs. 
5 Joining a meeting
after it has started.
When a Councillor joins a meeting after it has started
(whether in person or online) the Clerk will notify the
Chair, who will in turn notify the rest of the meeting. 
6 Leaving a meeting
before it has
concluded
Similarly, any Councillor who needs to leave the
meeting early, should notify the Chair and Clerk at the
start of the meeting, if possible, otherwise indicate to
either the Chair or the Clerk that they are leaving. 
For a Councillor who is attending remotely this can be
done by putting a message into the system chat
advising the Clerk and Chair, who in turn can advise the
meeting that the Councillor has left. 
7 Minuting
attendance 
When Councillors arrive late or leave early it is recorded
in the minute. 
If a Councillor has missed the sederunt and are not
present for all the meeting they will be marked as having
sent apologies and it will be noted in the minute which
items the Councillor joined the meeting for. 
8 System chat
function
Whilst the online meeting chat function can be useful
for those attending remotely to message the clerk and
other participants, it is not visible to the public and
should not be used as a substitute for discussion in
public. 
9 Phones and other
electronic devices
Councillors shall ensure that phones and other
electronic communications devices are on silent mode,
Page 314

Page 315

during Meetings (except when being used for the
purpose of enabling remote attendance). 
Where Councillors are corresponding with each other
during the meeting, whether verbally or by email, text,
social media it should be done respectfully and in a way
which is not disruptive to  the meeting. 
Use of electronic devices (for research or
communication outwith the chamber) is permitted
providing this is done in a manner which respects the
authority of the Chair, respects fellow Councillors and
does not interfere with the business of the Meeting. 
DEBATE, MOTIONS AND AMENDMENTS 
1 Debate Debate shall be controlled through the Chair as normal.
Councillors should aim to be as clear and concise as
possible. 
2 Written material  If written material needs to be circulated during the
meeting (where advance notice was not possible) this
shall be shared with all Councillors and relevant
Officers. If possible, such material should be kept
within one side of A4. 
The Chair will consider the competency of any such
material, taking advice from Officers where appropriate. 
3 Adjournment and
breakout
discussions
If required, the meeting shall be paused or adjourned
• to allow written material to be shared and read
• to facilitate group discussion on controversial
areas where negotiation would help for wording
for motions and amendments.  
Groups shall be responsible for including their online
group members in any breakout discussions.
Committee services staff may support breakout
discussions if required. 
VOTING AND DECISION 
1 Voting  At the close of summing-up the Chair shall instruct the
Clerk to proceed to the vote. 
The Clerk shall 
Page 315

Page 316

• invite Councillors to vote using the relevant icons
that will appear on their screens; 
• the Clerk will confirm if all Councillors have
voted before closing the vote and thereafter
declare the result which will also be visible on
screen; 
If for any reason the Electronic Voting system fails, the
Clerk will revert to taking the vote manually and shall 
• Advise Councillors to activate their
microphones, when asked to vote and then mute
again 
• Take the vote by roll call, pausing to allow each
Councillor time to vote 
• If a Councillor does not vote when contacted,
the Clerk will return to them at the end for a
second opportunity 
If a Councillor has been absent or missed part of the
debate it is for the Councillor to seriously and
objectively consider the duration of their absence from
the whole debate and determine whether they have
enough information to take part in the vote. 
For Councillors attending remotely it is encouraged that
they turn their cameras on for the duration of the vote
taking place. 
2 Drop out during
vote
If Councillors do not respond when asked to vote, the
Chair shall investigate and consider whether the
meeting should be adjourned. 
3 Announcement of
vote
The Clerk shall announce the result of the vote 
CONFIDENTIAL REPORTS
1 Pause in meeting The Chair shall pause the meeting to allow the Clerk to
ensure Members of the public are not present and
remind that only those who require to be present at the
meeting should remain. 
The Clerk will ensure that any public webcast link is
stopped and that only those who require to be
connected to the meeting remain. 
Page 316

Page 317

2 Resume meeting to
consider
confidential items.
The Chair shall resume the meeting and deal with
business as usual 
3 Considering
confidential items
The Chair will ask online attendees to confirm that: 
• They are in a place with no other persons present
• No persons can overhear the discussions
• They will not answer any other calls or attend to
any other business whilst participating in the
meeting. 
IN THE EVENT OF TECHNICAL DIFFICULTIES 
1 Loss of
sound/vision
Councillors should alert Committee Services: 
committee.services@moray.gov.uk 
or 
01343 563164 
If they are having technical difficulties. 
A Committee Services officer will alert the meeting
Clerk who shall clarify the extent of the issue with the
Chair. 
2 Continuation of the
meeting
If temporary dropout in the Chambers has been
resolved, the Chair can proceed with the meeting. 
If the issue is ongoing, the Chair shall advise that the
meeting will be adjourned for a short period to allow
investigation and resolution if possible. 
If the issue cannot be resolved, and if alternative
arrangements cannot be made for an online meeting,
the meeting will continue in person, with time given for
those attending remotely to come into the Chamber
provided the meeting is quorate. 
If the meeting is not quorate, meeting is adjourned and
re-scheduled until it can be quorate. 
Page 317

Page 318

Page 318

Page 319

APPENDIX 2 
Proposed webcast archive Copyright and re-use statement. 
The Council retains copyright in all webcast recordings, audio recordings, still images
and associated material. 
Webcast footage may be viewed, downloaded, shared and reproduced for personal,
educational, journalistic, civic participation and other non-commercial purposes,
subject to the conditions below. 
Conditions of reuse 
Any person reusing webcast material must: 
• acknowledge the Council as the source of the footage; 
• not edit, crop, dub, subtitle, manipulate or combine the footage in a manner that
alters its meaning or misrepresents the words or actions of any participant; 
• not present excerpts in a misleading, false or defamatory context; 
• not imply Council endorsement of any individual, organisation, political party,
campaign or viewpoint; 
• ensure that any excerpt is accompanied by sufficient contextual information to
allow a fair understanding of the proceedings; 
• not use artificial intelligence, synthetic media or other technologies to alter the
appearance, voice or meaning of the recording; 
• comply with applicable data protection, equality and electoral laws
Page 319

Page 320

Page 320

Page 321

APPENDIX 3 
INTEGRATED IMPACT ASSESSMENT (IIA)
This assessment covers Equalities & Socio-Economic Duties, Human Rights & Rights of the Child (UNCRC)
Please refer to IIA Guidance for assistance completing this assessment. 
DATE
DD/MM/YY
UPDATE(S) - Add section(s) revised & brief note of revision e.g. Q.7 Public consultation data / findings added.   SHAREPOINT VERSION
DETAILS - CLT USE ONLY 
17 July 26     
NAME OF PROPOSAL  Meetings Attendance Protocol 
STAGE 1 INITIAL SCREENING – Is the proposal a: Please ✓
New strategy, policy, project, plan, service, funding, full budget? ✓
Change to an existing strategy, policy, project, plan, service, funding, budget (including reduction / removal staff levels, hours
changed, posts)?
☐
Budget proposals? ☐
If none of the above apply, NO IIA is needed.  
If any of the above are ticked, does the proposal have the potential to affect
people from the below categories differently to the wider Moray population: 
Yes Maybe No
Positive Negative Positive Negative
Any protected characteristics individuals or groups (Equality Act 2010) ✓ ✓ ☐ ☐ ☐
Any socio-economic disadvantaged individuals or groups – i.e. low / no income /
wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People (UNCRC) ☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the above boxes have been selected 
The policy includes provisions to help with the running of hybrid committee meetings which allow Councillors to attend in person, in
Council HQ as well as at home via weblink. 
Positive: travel time and time away from home could be viewed as a barrier to someone wishing to stand for office as a Councillor.
Standardising online meeting access may improve the attractiveness of standing for public office. 
Page 321

Page 322

APPENDIX 3 
Negative: Earlier drafts of the protocol included a “cameras on at all times” requirement. This could be viewed as discriminatory against
those from neuro diverse backgrounds due to sensory, wellbeing and privacy considerations. 
The wording has been amended to require cameras on while speaking. This measure strikes a balance between transparency and
addressing individual concern.  By removing the blanket requirement it is considered that the negative impact has been removed. 
STAGE 1 Sign Off
Lead Officer Signature
A McEachan Date 16/7/26
Names of others involved in
STAGE 1 initial screening
n/a 
If any STAGE 1 answers above are ‘Maybe’ or ‘Negative’ please complete STAGE 2 and refer to IIA Guidance for help.  
STAGE 2 – FULL IIA
1. Please give a brief description of the current service / proposal.
Webasts are already in use. There is a current protocol to which changes are proposed. 
2. Who are the main stakeholders? E.g. Customers, staff, families, carers, partners, community groups. 
Councillors and officers– as meeting attendees.
Public – a viewers 
3. What changes as a result of the proposal(s)? 
The “cameras on” proposal was originally proposed as part of that change.  Following the workshop session, where feedback from
Councillors was considered, this proposal has been to “cameras on when speaking”.   
4. Does the proposal affect your customers? If so, how does it affect them?  
With the amendment the proposed change is not considered to have a negative impact. 
Page 322

Page 323

APPENDIX 3 
5. What impact will the proposal have on staff providing the service? 
n/a 
6. EVIDENCE - Please provide details / links to the information you have used for this assessment.
CONSULTATION(S) – What consultation / engagement has been carried out to inform the IIA? 
Internal consultation Consultation with members an officers in workshop help on 13 April. 
Consultation with affected groups  
DATA – What has been used to inform the IIA?
Local Performance Data (e.g. usage
statistics) 
National statistics 
Other – Research / Best Practice / Guidance Practice from elsewhere was considered and a more lenient approach adopted. 
Evidence Gaps – Do you need any additional
information? If so, please explain. 
7. EQUALITIES AND SOCIO-ECONOMIC IMPACT(S) - Please identify any impact to each group.  Please see guidance for examples.
Protected Groups –
Please use link for more
information
Positive Impact(s)  Negative Impact(s) Mitigation(s) – Practical actions/adjustments to reduce or
eliminate any negative impact(s).  What can be done to make it
fairer?
Age (include children,
young people, midlife
and older people) 
There may be
concerns for young
people such as
petitioners or pupil 
representatives 
under 18 at council
committees regarding
All lay attendees invited to speak at committee will be
informed in advance that the meeting is webcast, recorded,
archived and footage may be reused by third parties in
accordance with the Council's published Webcast Reuse
terms. This is echoed via notices displayed outside chambers.
Active consent will be sought from attendees under the age of
18.
Page 323

Page 324

APPENDIX 3 
public reuse of clips in
line with the Protocol . 
Carers (for elderly,
disabled or minors)
Would allow those
with caring
responsibility to
attend meetings
more easily.  
Disability Would allow those
with disability to
attend meetings
more easily. 
Cameras on at all
times would have had
a potential negative
impact. 
Mitigation is cameras on when speaking 
Gender reassignment   
Marriage and civil
partnership   
Pregnancy and maternity
(including breastfeeding)
Would allow those
with caring
responsibility to
attend meetings
more easily.  
Race   
Religion and / or belief   
Sex   
Sexual orientation   
Page 324

Page 325

APPENDIX 3 
Inequalities arising from
socio-economic
disadvantage   
HUMAN RIGHTS – Please use link to see all that
may apply and add or remove below
Does proposal interfere
(limit, restrict or make it
harder to enjoy) right(s)? 
Mitigation(s) – Practical actions/adjustments to reduce /
eliminate negative impact(s).  How do we make it fairer?
Article 5 Right to liberty and security  
Article 6 Right to a fair trial  
Article 8 Respect for private / family life, home
and correspondence  
Article 10 Freedom of expression  
Article 11 Freedom of assembly and association  
Article 14 Non-discrimination  
Protocol 1, Article 1- Right to peaceful
enjoyment of property  
Protocol 1, Article 2 - Right to education   
RIGHTS OF CHILDREN & YOUNG PEOPLE (UNCRC)
Please use link to identify all that apply and add
below
How does proposal
interfere with rights?
(limit, restrict or make it
harder to enjoy)
Mitigation(s) – Practical actions/adjustments to reduce /
eliminate negative impact(s).  How do we make it fairer?
Article 2 – Non discrimination  
Article 3 – Best Interest of a Child  
Article 6 – Right to life, survival and development  
Article 12 – Respect the views of the child  
Article 23 – Children with a disability   
8. Justification – Show balanced consideration of any impacts / lack of mitigations against the proposal need / outcome.   E.g. Is iit
considered proportionate, appropriate, necessary and / or unavoidable i.e. overriding public benefit. 
Page 325

Page 326

APPENDIX 3 
Some negative impacts have been found that cannot be fully mitigated, but they can be justified as follows:
• It is considered that the negative effects originally identified have been removed by mitigation. 
• That only leave positive impacts of the policy. 
STAGE 3 – IMPACT SUMMARY Please Tick (√)
Negative Impacts Identified 
• Can be mitigated and justified (Q7 above)  ✓
• Cannot be fully mitigated, but are justified (Q8 above) ☐
• Cannot be fully mitigated nor justified (Q7 & Q8 above) ☐
The proposals interfere with Human Rights and /or the Rights of the Child ☐
Further consultation with affected groups is needed ☐
It is advised not to go ahead with the proposals ☐
FINAL DECISION – Include any Committee / Board recommendations and /or rationale for approving proposal or not.
The proposal will be presented to <insert name of Committee / Board> on <insert date of Committee> for consideration and / or final decision
on whether to proceed with the proposal or not.
Committee / Board Final Decision – 
FINAL AUTHORISATION / SIGN OFF - Final IIAs will be published to www.moray.gov.uk/IIAs at point of final decision.
Service  Dept. Governance Permission
to Publish
✓
IIA Completed
By
Name  A McEachan  Date 
Position Chief Governance Officer 
Page 326

Page 327

APPENDIX 3 
Signed off by
Head of Service
Name A McEachan  Date 16.07.26 
Page 327

Page 328

Page 328

Page 329

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Tracey Sutherland Contact
Email:
tracey.sutherland@moray.gov.uk  
Subject: Future Meeting Dates 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to approve a change to the schedule of meetings of Moray
Council in January and February 2027 and agree the meeting timetable until December
2027.  
1.2  This report is submitted to Council in terms of Section II (10) of the Council’s Scheme of
Administration relating to changes in Committee structure, distribution of functions and
responsibilities.  
2.  SUMMARY  
2.1  This report seeks to amend the timing of the first Council meeting in January 2027 and to
add a special meeting of Moray Council in February 2027 to consider the budget.  
2.2 The report also seeks agreement for Council meetings until December 2027.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Council agree to:   
i)  re-schedule the meeting of Moray Council due to be held on 13 January 2027
to 27 January 2026; 
ii)  hold a special meeting of Moray Council at 9.30am on 24 February 2027 with
the scheduled ordinary meeting to begin immediately following the special
meeting or at 2pm, whichever is earliest, on the same day; and 
iii) agree a schedule of meetings, following the Local Government Elections in
May 2027 until December 2027 to allow the new Council to complete a
Committee cycle prior to having to agree a timetable until April 2032.
Item 18.
Page 329

Page 330

Tracey Sutherland
Service Manager Democratic Services 
4.  BACKGROUND AND CONTEXT  
4.1  At the meeting of the Council on 25 June 2025, a new schedule of meeting was agreed.
(para 19 of the minute refers).  
5.  PROPOSALS  
5.1  It is proposed to reschedule the meeting on 13 January 2027 to 27 January 2027 to give
Officers more time to consider the implications of the Scottish Government budget
announcement.  
5.2  It is requested that a Special meeting of the Council be held at 9.30am on 24 February
2027 with the scheduled ordinary meeting being held immediately following the special
meeting or at 2.00pm, whichever is the earliest.  
5.3 A draft meeting schedule is attached at Appendix 1 for consideration and approval.  The
timings of the meetings are following the current meeting cycles.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital       X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best Value,
will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
Page 330

Page 331

☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support and
contribute to improved outcomes for communities as outlined in the following Local
Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
None  
6.4  Financial 
None 
6.5  Risk 
None  
6.6  Staffing 
None  
6.7  Best Value and Transformation 
None  
6.8  Property 
None  
6.9  Information Communications/Technology/Digital 
None.  
6.10  Equalities, Social Inclusion and Economic Impact 
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Page 331

Page 332

Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
6.11  Climate Change and Biodiversity Impacts 
None 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Corporate Leadership Team, Chief
Financial Officer and the Chief Governance Officer (Monitoring Officer) and any comments
made have been incorporated into the report   
8.  BACKGROUND PAPERS  
8.1  None   
Page 332

Page 333

APPENDIX 1
Committee Timetable 
May 2027 – December 2027 
MAY 2027
18/05/2027 Moray Council (First meeting of the newly elected Council) 9.30am
25/05/2027 Corporate 9.30am
27/05/2027 IJB Clinical and Care Governance Committee  10.00am
27/05/2027 Harbours Sub Committee 2:00pm
JUNE 2027
01/06/2027 Education, Children’s and Leisure Services  9.30am
08/06/2027 Economic Development and Infrastructure Services 9.30am
09/06/2027 Community Planning Board 2.00pm
10/06/2027 Housing and Community Safety 9.30am
15/06/2027 Audit and Scrutiny 9.30am
17/06/2027 Planning and Regulatory Services 9.30am
23/06/2027 Licensing Committee 9.30am
23/06/2027 Licensing Board 2.00pm
24/06/0207 IJB Audit, Performance and Risk Committee  9.30am
24/06/2027 Moray Integration Joint Board 1.30pm
25/06/2027 Grampian Valuation Joint Board 9.30am
30/06/2027 Moray Council 9.30am
AUGUST 2027
19/08/2027 Moray Local Review Body 9.30am
26/08/2027 Police and Fire and Rescue Services 2:00pm
26/08/2027 IJB Clinical and Care Governance Committee  10.00am
31/08/2027 Corporate 9.30am   
SEPTEMBER 2027
01/09/2027 Community Planning Board 2.00pm
07/09/2027 Education, Children’s and Leisure Services 9.30am
08/09/2027 Licensing Committee  9.30am
08/09/2027 Licensing Board 2.00pm
09/09/2027 Planning and Regulatory 9.30am
14/09/2027 Harbours Sub-Committee 9.30am
21/09/2027 Economic Development and Infrastructure Services 9.30am
23/09/2027 Housing and Community Safety 9.30am
28/09/2027 Audit and Scrutiny 9.30am
29/09/2027 Moray Council 9.30am
30/09/2027 IJB Audit, Performance and Risk Committee  9.30am
30/09/2027 Moray Integration Joint Board 1.30pm
OCTOBER 2027
21/10/2026 Moray Local Review Body 9.30am
28/10/2026 Planning and Regulatory Services 9.30am
NOVEMBER 2027
03/11/2027 Licensing Committee  9.30am
03/11/2027 Licensing Board 9.30am
10/11/2027 Moray Council 9.30am
Page 333

Page 334

11/11/2027 Police and Fire and Rescue Services 2.00pm
18/11/2027 Moray Local Review Body 9.30am
23/11/2027 Corporate Services 9.30am
24/11/2027 Community Planning Board 2.00pm
25/11/2027 Moray Integration Joint Board 10.00am
30/11/2027 Education, Children and Leisure Services 9.30am
DECEMBER 2027
02/12/2027 Planning and Regulatory Services 9.30am
07/12/2027 Economic Development and Infrastructure Services 9.30am
09/12/2027 Housing and Community Safety 9.30am
14/12/2027 Harbours Sub Committee 9.30am
15/12/2027 Audit and Scrutiny 9.30am
16/12/2027 Moray Local Review Body 9.30am 
Page 334

Page 335

Report to: Moray Council Meeting Date: 30 September 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Tracey Sutherland Contact
Email:
Tracey.sutherland@moray.gov.uk 
Subject: Outside Bodies Appointments 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider whether to express an interest in appointing a
Council representative to the Regional Energy Strategic Planning Scotland Group, and to
consider vacancies which have arisen on other outside bodies.  
1.2  This report is submitted to Council in terms of Section II (12) of the Council’s Scheme of
Administration relating to appointments to Outside Bodies.  
2.  SUMMARY  
2.1  A request has been received from the Chief Executive Officer, National Energy System
Operator (NESO) inviting the Council to express interest in appointing a Councillor to help
shape the governance of the Regional Strategic Plan (RESP) for Scotland.  
2.2 Following the resignation of Councillor Cameron on 2 September 2026 from 2 Outside
Bodies, a vacancy has now arisen on the Findhorn Bay Local Nature Reserve Management
Committee.  
2.3 Councillor Cameron has also resigned from the Moray Leisure – Board of Directors,
bringing the number of Council vacancies on the Board to 2, following Councillor Macrae’s
resignation in September 2025.  
3.  RECOMMENDATIONS  
3.1  It is recommended that Council:   
i)  agree whether or not to express an interest in nominating a Councillor to take
part in the NESO Strategic Board; 
ii)  if, agreeing to nominate a Councillor, agree which Councillor to nominate;
Item 19.
Page 335

Page 336

iii) note that Officer representation will be arranged through local government
working groups.   
iv) agree whether to appoint a Councillor to represent the Council on the
Findhorn Bay Local Nature Reserve Management Committee; 
v)  agree whether to appoint 2 Councillors representatives to sit on the Moray
Leisure – Board of Directors; and   
vi) If agreeing to nominate Councillors to the vacancies at iv) and v) which
Councillors to be appointed.   
Tracey Sutherland
Service Manager Democratic Services 
4.  BACKGROUND AND CONTEXT 
NESO
4.1  A request was received on 25 August 2026 from National Energy System Operator to invite
the Council to express interest in appointing a Councillor to help shape the governance of
the Regional Strategic Plan (RESP) for Scotland.  
4.2  Further details of NESO and the role are detailed in Appendix 1. In addition, the
Expression of Interest form is produced as Appendix 2. 
4.3  As there are only six seats for local government representatives on the Strategic Board,
being successful will be highly competitive as it is anticipated that there will be
expressions of interest from a number of other local authorities.  Representatives will need
to ensure that local ambitions, evidence and practical constraints inform the RESP’s
development, helping to identify where infrastructure may be needed to enable growth
and support more coordinated, efficient investment. If Council elects to nominate a
member for the Strategic Board, then they will be required to provide details of relevant
responsibilities and accountabilities which make them well suited to the role as well as
any conflicts of interest. Any Alternate provided will also be required to provide this
information. 
Other Vacancies
4.4  At the meeting of Moray Council on 3 December 2025 (para 24 of the minute refers),
following the resignation of Councillor Macrae from one of the three Council nominated
director positions on the Board of  Moray Leisure Limited,  it was agreed that the vacancy
would not be filled due to a review of Moray Leisure Limited’s governing documents. 
4.5  Following review, no changes to Moray Leisure's governing documents are being pursued. 
The Council are now asked to consider the 2 Board vacancies, as well as the vacancy on
the Findhorn Bay Local Nature Reserve Management Committee. 
5.  PROPOSALS  
Page 336

Page 337

5.1  It is proposed that the Council consider whether to express an interest in nominating a
Councillor and agree whether to make appointments to the vacant outside body positions.  
5.2  Following resignations from the Moray Leisure Centre – Board of Directors and Findhorn
Bay Local Nature Reserve Management Committee agree whether to appoint new
representatives.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital         X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☐ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
None  
6.4  Financial 
None 
Page 337

Page 338

6.5  Risk 
None  
6.6  Staffing 
None  
6.7  Best Value and Transformation 
None  
6.8  Property 
None  
6.9  Information Communications/Technology/Digital 
None  
6.10  Equalities, Social Inclusion and Economic Impact  
Does the proposal have the
potential to affect people from the
below categories differently to the
wider Moray population: 
Yes Maybe No 
Positive Negative Positive Negative 
Any protected characteristics
individuals or groups (Equality Act
2010)
☐ ☐ ☐ ☐ ✓
Any socio-economic disadvantaged
individuals or groups – i.e. low / no
income / wealth or deprivation
☐ ☐ ☐ ☐ ✓
Human Rights of individuals ☐ ☐ ☐ ☐ ✓
Rights of Children or Young People
(UNCRC)
☐ ☐ ☐ ☐ ✓
JUSTIFICATION - Please provide a brief justification statement explaining why the
above boxes have been selected 
6.11  Climate Change and Biodiversity Impacts 
None     
7.  CONSULTATION  
Page 338

Page 339

7.1  This report has been prepared in consultation with the Corporate Leadership Team, Head
of Growth, Planning and Climate and Chief Governance Officer (Monitoring Officer) and
any comments have been incorporated into the report.
8. BACKGROUND PAPERS
8.1
Page 339

Page 340

No embedded text on this page.

Page 341

National Energy
System Operator
How nations and regions will shape
their future energy system
A Simple Guide to
RESP Governance
August 2026
Public Appendix 1
Page 341

Page 342

2
A Simple Guide to RESP GovernancePublic
Governance that puts
nations and regions at the
heart of energy planning
Regional Energy Strategic Plans (RESPs) will identify the energy 
system requirements needed to support economic growth and 
deliver reliable, clean and affordable energy across Scotland, 
Wales and nine English regions.
Historically, planning for electricity, gas, heat, transport and local
development has often happened separately, creating uncertainty about what
infrastructure will be needed and when. RESP will bring these areas together into a single,
joined-up view of future energy needs. Its governance will give leaders in each nation and
region a formal role in shaping and approving the plan. RESP forms part of NESO’s broader
role in planning the future energy system in Great Britain, which you can find out more
about by visiting Strategic Planning on our website.
This guide is for anyone interested in taking part in RESP governance within the nations
and regions. It reflects the draft RESP methodology, which remains subject to approval by
Ofgem and the Secretary of State. You can read the draft methodology, which includes
the draft Terms of Reference for the governance groups covered in this guide, by visiting
RESP – Methodology Consultation on our website.
Each nation and region will have a Strategic Board, supported by a Local Government
Working Group and thematic Working Groups. NESO’s independent energy experts,
based in the nations and regions, will work with these groups to bring local priorities and
technical evidence into a whole system view. GB-wide groups will help coordinate issues
that cross boundaries or require a consistent national approach.
Why take part?
For the first time, local leaders will have a formal role in influencing the future energy
needs of their area, helping to realise local development and investment ambitions.
Taking part is an opportunity to bring local ambitions, priorities and evidence directly into
long-term energy planning. 
Members of the Strategic Board and Working Groups will help identify where infrastructure
may be needed to enable economic growth, building a shared evidence base that will
inform future distribution network planning and investment decisions.
Page 342

Page 343

3
A Simple Guide to RESP GovernancePublic
The Strategic Board
What it will do: In each nation and region, the Strategic Board will steer the development
of the RESP, providing strategic direction, considering the main choices and trade-offs
and helping ensure the plan reflects local priorities while aligning with national goals. The
Strategic Board has a formal role in approving the RESP.
How membership will be composed: Each Board is expected to have up to 16 members
and is chaired by NESO. Membership will be drawn from the electricity and gas distribution
networks, up to six representatives speaking collectively for local government and up to
four ‘cross-sector actors’ bringing wider whole energy system perspectives. The Scottish
Government or Welsh Government will also sit on the relevant nation’s Board.
For local government, where strategic authorities exist, we expect them to be represented,
with the remaining local government places shared across the rest of the nation or region
up to the six-seat limit. NESO will seek a balance across different types of place and a
range of social factors, so that the Board reflects the breadth of communities it serves.
Who we are looking for: All Strategic Board members will think strategically, understand
and challenge complex evidence, communicate clearly and work towards consensus.
They will exercise sound, transparent judgement and have the authority and credibility
to participate in decisions that support the nation or region as a whole.
We expect Board members to be established leaders, operating at Director level or
equivalent. For local government, Board members may be either elected members
with a relevant portfolio or senior officers. Representatives may put forward a named
substitute, operating at the same level of seniority.
To bring wider whole system perspectives to the Board, we are seeking up to four ‘cross-
sector actors’ who can bring substantial experience in the nation or region and particular
depth in the whole system energy transition, heat networks, commercial energy use,
industry, maritime, transport, fuel poverty, community energy or consumer interests.
Local Government Working Group
What it will do: Local authorities across the nation or region will be able to participate
through the Local Government Working Group. It will provide a formal route to shape the
RESP by bringing together local plans, priorities, evidence and constraints; testing emerging
proposals; and advising the Strategic Board. Representatives of local government on the
Strategic Board will collectively represent the Working Group at that level.
Page 343

Page 344

4
A Simple Guide to RESP GovernancePublic
Who we are looking for: A local authority representative who understands their place’s
priorities and plans and can work across organisational and geographic boundaries.
They will bring evidence into the process, listen to the needs of different places, help
identify common ground and keep colleagues in their authority informed. We 
anticipate that membership will comprise officers in areas such as energy strategy 
and strategic planning.
Thematic Working Groups
What they will do: Thematic Working Groups will bring practical experience and specialist
insight into the development of the RESP. Participants will help review planning evidence,
identify regional priorities and highlight risks, uncertainties and trade-offs. The precise
structure may vary by nation or region, but is expected to cover the following themes:
	
● Consumer and Commercial Demand – considering issues such
as residential and commercial consumer needs, heat, commercial
energy use and demand flexibility.
	
● Generation and Storage – considering issues such as electricity
generation, community energy, storage and connections.
	
● Industrial Decarbonisation – considering issues such as industrial
energy needs, decarbonisation pathways and infrastructure
requirements.
	
● Transport – considering issues such as passenger and freight
transport, charging infrastructure and alternative fuels.
Who we are looking for: Practitioners and subject-matter experts with relevant delivery
experience or sector insight in their nation or region. Participants should be able to bring
evidence and a wider sector perspective, test emerging proposals constructively and
identify how different choices could affect delivery.
Page 344

Page 345

5
A Simple Guide to RESP GovernancePublic
Operating across Working Groups
RESP governance is designed with stakeholder capacity at front of mind. We do not 
expect stakeholders to need to sit on multiple Working Groups or that there will be
advantage in doing so. Throughout the development of RESP, NESO will seek to bring 
the views of Working Groups together to ensure a whole system approach. 
What taking part will involve
Taking part in a Strategic Board or Working Group will involve preparing for and 
attending meetings linked to key RESP milestones, drawing on the views and evidence
of the participant’s wider place, sector or network, and responding to occasional time-
sensitive requests.
We expect participants to remain involved throughout the first RESP cycle, which runs
for two years to December 2028, and to commit up to eight days over that period.
Participation is expected to be voluntary and unpaid and will not create an employment
relationship with NESO, although reasonable expenses may be covered.
Everyone involved will act in the public interest and follow the Seven Principles of Public
Life. They will exercise independent judgement, declare relevant interests, respect
confidentiality and contribute constructively to collective discussions and decisions..
How to express an interest
NESO is writing directly to local authorities and energy distribution networks with further
instructions on how to put forward expressions of interest.
If you are from another sector and are interested in putting forward an expression of
interest for the Strategic Board or a thematic Working Group in one of the RESP nations
and regions, please visit Regional Energy Strategic Planning (RESP) on our website.
Page 345

Page 346

NESO
Faraday House
Warwick Technology Park
Gallows Hill
Warwick
CV34 6DA
United Kingdom
Registered in England and Wales
No. 11014226
neso.energy
National Energy
System Operator
Page 346

Page 347

1
Public
RESP Strategic Board Local Government Expression
of Interest Form
This form is for a local authority or combined authority wishing to express an interest in
representation on a RESP Strategic Board. Before completing the form, please review the
Simple Guide to Governance, which explains the role of the Strategic Board, eligibility
and expectations for local authority and combined authority members, and the role of
named alternates.
Local authority or combined authority details
Name of local authority or combined authority:
Name of person submitting the expression of interest on behalf of the organisation:
Job title: 
Email address:
Proposed local authority or combined authority Strategic Board representative:
Full name: 
Job title:
Relevant responsibilities and accountabilities within the local authority or combined
authority:
Email address:
Potential conflicts of interest (or state “None”):
Proposed named alternate details (optional):
Full name: 
Job title:
Relevant responsibilities and accountabilities within the local authority or combined
authority:
Email address:
Potential conflicts of interest (or state “None”):
Additional information (optional):
Appendix 2
Page 347

Page 348

Page 348