Page 1

Moray Council 
Tuesday, 30 June 2026 
NOTICE IS HEREBY GIVEN that a Meeting of the Moray Council is to be held at
Council Chambers, Council Office, High Street, Elgin, IV30 1BX on Tuesday, 30 June
2026 at 09:30. 
BUSINESS 
1. Sederunt 
2. Declaration of Group Decisions and Members Interests * 
3. Resolution
Consider, and if so decide, adopt the following resolution:
"That under Section 50A (4) and (5) of the Local Government (Scotland)
Act 1973, as amended, the public and media representatives be excluded
from the meeting for Items 17 - 21 of business on the grounds that it
involves the likely disclosure of exempt information of the class
described in the relevant Paragraphs of Part 1 of Schedule 7A of the Act.”   
4. Minutes 
4a. Minute of meeting dated 6 May 2026 7 - 14
4b. Minutes of meeting of 19 May 2026 15 - 18
5. Written Questions ** 
6. Portgordon School Bus Service Petition
Report by Executive Director Economy, Enterprise and Operations  
19 - 34
7. Climate Change Strategy
Report by Executive Director Economy, Enterprise and Operations  
35 -
108
Page 1

Page 2

8. Revenue Out-Turn Variances from Budget
Report by Executive Director Finance, Strategy and Transformation  
109 -
142
9. Capital Plan 2025-2026 Budget Monitoring
Report by Executive Director Finance, Strategy and Transformation  
143 -
160
10. Common Good Funds - Summary Expenditure 2025-26
Estimated Disposable Income 2026-27
Report by Executive Director Finance, Strategy and Transformation  
161 -
182
11. Elgin Neighbourhood Board - Appointment of Chair
Report by Executive Director Economy, Enterprise and Operations  
183 -
188
12. Council Records Management Plan
Report by Executive Director Economy, Enterprise and Operations  
189 -
210
13. Timeline Options for Consideration of a potential draft
Visitor Levy Scheme
Report by Executive Director Economy, Enterprise and Operations  
211 -
222
14. Moray Growth Deal Annual Report 2025
Report by Executive Director Economy, Enterprise and Operations  
223 -
290
15. Short-Term Let Control Areas
Report by Executive Director Economy, Enterprise and Operations  
291 -
306
16. Information Reports - if called in 
Item(s) which the Committee may wish to consider with the
Press and Public excluded   
17. Case Management System Replacement Report [Para 8]
• 8. The amount of any expenditure proposed to be incurred by the
authority under any particular contract for the acquisition of
property or the supply of goods or services. 
18. Moray Growth Deal Skills Delivery [Para 7]
• 7. Information relating to the financial or business affairs of any
particular person (other than the authority). 
Page 2

Page 3

19. Depot and Stores Rationalisation Project Update [Para 9]
• 9. Any terms proposed or to be proposed by or to the authority in
the course of negotiations for a contract for the acquisition or
disposal of property or the supply of goods or services. 
20. Moray Affordable Housing Programme - Compulsory
Purchase Order [Para 9]
• 9. Any terms proposed or to be proposed by or to the authority in
the course of negotiations for a contract for the acquisition or
disposal of property or the supply of goods or services. 
21. Chief Officer Recruitment Head of Growth Planning and
Climate [Para 1]
• 1. Information relating to a particular employee, former employee
or applicant to become an employee of, or a particular office-
holder, former office-holder or applicant to become an office-
holder under, the authority. 
Information Reports - Not for Discussion at this Meeting
Any member wishing to call in a noting or information report from one
meeting shall give notice to Committee Services by 12 noon 2 clear
working days before the meeting for which the report is
published.  Please see Standing Order 38 for deadlines. The Notice
shall be countersigned by one other elected member and shall explain
the reason for call in including any action sought.   
Information Report - Child Poverty Fund Update
Report by Executive Director Education, Housing and Communities  
307 -
312 
Watching the Meeting
You can watch the webcast live by going to:    
http://www.moray.gov.uk/moray_standard/page_43661.html    
Webcasts are available to view for 1 year following the meeting.  
You can also attend the meeting in person.  If you wish to attend
in person, please come to the High Street entrance door and a
member of staff will let you into the Chamber. 
Page 3

Page 4

GUIDANCE NOTES 
* Declaration of Group Decisions and Members Interests - The Chair of the
meeting shall seek declarations from any individual or political group at the
beginning of a meeting whether any prior decision has been reached on how the
individual or members of the group will vote on any item(s) of business on the
Agenda, and if so on which item(s).  A prior decision shall be one that the
individual or the group deems to be mandatory on the individual or the group
members such that the individual or the group members will be subject to
sanctions should they not vote in accordance with the prior decision.  Any such
prior decisions will be recorded in the Minute of the meeting. 
** Written Questions - Any Member can put one written question about any relevant
and competent business within the specified remits not already on the agenda, to
the Chair provided it is received by the Proper Officer or Committee Services by
5pm three working days prior to the day of the meeting, please see Standing Order
36 for deadlines.  A copy of any written answer provided by the Chair will be
published on the Council’s committee management system by 12pm the day
before the meeting.  The Member who has put the question may, after the answer
has been published, may ask one supplementary question directly related to the
subject matter at the meeting, but no discussion will be allowed. 
No supplementary question can be put or answered more than 10 minutes after
the Council has started on the relevant item of business, except with the consent
of the Chair. If a Member does not have the opportunity to put a supplementary
question because no time remains, then he or she can submit it in writing to the
Proper Officer who will arrange for a written answer to be provided within 7
working days. 
Page 4

Page 5

MORAY COUNCIL 
Moray Council 
SEDERUNT 
Councillor Kathleen Robertson (Chair)
Councillor Amber Dunbar (Depute Chair)  
Councillor James Allan (Member)
Councillor Peter Bloomfield (Member)
Councillor Neil Cameron (Member)
Councillor Tracy Colyer (Member)
Councillor Theresa Coull (Member)
Councillor John Cowe (Member)
Councillor John Divers (Member)
Councillor Jérémie Fernandes (Member)
Councillor Donald Gatt (Member)
Councillor David Gordon (Member)
Councillor Juli Harris (Member)
Councillor Sandy Keith (Member)
Councillor Elaine Kirby (Member)
Councillor Scott Lawrence (Member)
Councillor Marc Macrae (Member)
Councillor Paul McBain (Member)
Councillor Neil McLennan (Member)
Councillor Shona Morrison (Member)
Councillor Bridget Mustard (Member)
Councillor Derek Ross (Member)
Councillor John Stuart (Member)
Councillor Draeyk Van Der Horn (Member)
Councillor Sonya Warren (Member)
Councillor Ben Williams (Member)  
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 5

Page 6

Page 6

Page 7

MORAY COUNCIL 
Minute of Meeting of the Moray Council 
Wednesday, 6 May 2026 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe, Councillor
John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith,
Councillor Elaine Kirby, Councillor Scott Lawrence, Councillor Marc Macrae,
Councillor Paul McBain, Councillor Neil McLennan, Councillor Shona Morrison,
Councillor Bridget Mustard, Councillor Kathleen Robertson, Councillor Derek Ross,
Councillor John Stuart, Councillor Draeyk Van Der Horn, Councillor Sonya Warren 
APOLOGIES 
Councillor Ben Williams 
IN ATTENDANCE 
The Chief Executive, Executive Director Economy, Enterprise and Operations,
Executive Director Finance, Strategy and Transformation, Chief Financial Officer,
Chief Governance Officer (Monitoring Officer), Head of Growth, Planning and
Climate, Head of Housing, Property and Communities, Head of Operations and
Environment, Service Manager Education Estate, Service Manager Growth Deal,
Service Manager Housing Strategy, Climate Strategy Officer, Emergency Planning
Officer, C English, Project Officer and L Rowan, Committee Services Officer. 
1.         Chair 
Councillor Kathleen Robertson chaired the meeting.  
2.        Condolences 
Following an invitation from the Chair, the Council joined Councillor Keith in offering
condolences to the family of former Councillor Connell Smith, noting his long public
service on Moray District Council (1988–92 and 1994–96) and his role on the Shadow
Moray Council. He was remembered as a well-known, larger-than-life figure in
Bishopmill and Elgin, a committed Labour and trade union member who helped lead
major local campaigns, and a dedicated modern studies teacher who inspired
generations. He also gave many years of service to Bishopmill Hall as a trustee.
Councillor Keith said Connell’s passion, humour and strong presence will be greatly
missed, and extended sympathy to his wife, Linda. 
Item 4a.
Page 7

Page 8

3.         Jo Cox Foundation
Prior to moving to the first item of business, the Chair made a brief introductory
comment. She stated that this year marks ten years since the murder of Jo Cox MP on
16 June 2016, and also remembered Sir David Amess MP, who was murdered on 15
October 2021. In her maiden speech, Jo Cox said: “the truth is that we have more in
common than that which divides us,” and the Chair noted that this felt especially
important for all of those in public service. 
The Chair noted that abuse and intimidation remain an ongoing issue for elected
representatives, including local councillors, with real consequences for individuals,
families and local democracy, and asked everyone to help maintain the highest
standards of respect and civility in the chamber in displaying robust debate where
needed, but always with professionalism and care for one another so as to set the
tone and lead by example. 
Members were reminded of the Jo Cox Foundation resource pack that had been
circulated and were encouraged, on 16 June, to mark the anniversary in whatever way
felt appropriate, including sharing the agreed messaging on social media. The Chair
also noted that COSLA Leaders had adopted the COSLA Civility in Public Life Charter,
which was available for reference and should be a benchmark for all councillors. 
4.         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 and the Councillors' Code of Conduct, there
were no declarations from Group Leaders or Spokespersons in regard to any prior
decisions taken on how Members will vote on any item on the agenda or any further
declarations of Member's interests in respect of any item on the agenda.    
5.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media representatives be excluded
from the meeting for Item 14 of business on the grounds that it involves the likely
disclosure of exempt information of the class described in the relevant Paragraphs of
Part 1 of Schedule 7A of the Act.   
Para Number of Minute Para Number of Schedule 7a
13
Para 7
The meeting resolved that in terms of Section 50A (4)
and (5) of the Local Government (Scotland) Act 1973,
as amended, the public and media representatives be
excluded from the meeting for Item 14 of business on
the grounds that it involves the likely disclosure of
exempt information of the class described in the
relevant Paragraphs of Part 1 of Schedule 7A of the Act.  
Para 9
Any terms proposed or to be proposed by or to the
authority in the course of negotiations for a contract for
Page 8

Page 9

the acquisition or disposal of property or the supply of
goods or services. 
15
Para 7
The meeting resolved that in terms of Section 50A (4)
and (5) of the Local Government (Scotland) Act 1973,
as amended, the public and media representatives be
excluded from the meeting for Item 14 of business on
the grounds that it involves the likely disclosure of
exempt information of the class described in the
relevant Paragraphs of Part 1 of Schedule 7A of the Act.  
Para 9
Any terms proposed or to be proposed by or to the
authority in the course of negotiations for a contract for
the acquisition or disposal of property or the supply of
goods or services. 
16 
Para 7
The meeting resolved that in terms of Section 50A (4)
and (5) of the Local Government (Scotland) Act 1973,
as amended, the public and media representatives be
excluded from the meeting for Item 14 of business on
the grounds that it involves the likely disclosure of
exempt information of the class described in the
relevant Paragraphs of Part 1 of Schedule 7A of the Act. 
6.         Minutes 
The minutes of the special meeting of Moray Council dated 25 February 2026 and
ordinary meeting of Moray Council dated 25 February 2026 were submitted and
approved. 
7.         Written Questions 
The Council noted that no written questions had been submitted.  
8.         Moray Council Climate Change Strategy 2025-2035 
The Chair stated that the Moray Council Climate Change Strategy 2025-2035 had
been deferred until the next meeting of Moray Council on 30 June 2026 as it was
considered that, given notice of potential amendments, debate may become political
with potential to breach pre-election publicity guidance. This was noted. 
9.         Moray Council Biodiversity Strategy 2026-2036 
Under reference to paragraph 14 of the Minute of the meeting of Moray Council dated
27 August 2025, the meeting had before it a report by the Executive Director
Economy, Enterprise and Operations asking the Council to consider and note
responses to the draft Moray Council Biodiversity Strategy and approve the final
version of the Strategy.
Page 9

Page 10

During discussion, Councillor Harris queried why the report on the Climate Change
Strategy had been deferred and the Biodiversity Strategy was still on the agenda for
discussion as, in her opinion, the Biodiversity Strategy aligned with the Climate
Change Strategy. 
In response, the Executive Director Economy, Enterprise, and Operations advised
that, although the Council was in the pre-election period, there was still a
requirement for the Council to conduct business as usual however if the debate
became political then the Monitoring Officer would intervene. 
Councillor McLennan, in noting that the Scottish Parliament Election was due to be
held the following day and that there was a risk that debate on any item could
become political, proposed that the meeting be deferred until after the election. 
In response, the Monitoring Officer advised that there was no mechanism within the
Council’s Standing Orders to defer an entire meeting and that, although the Council
was in the pre-election period, a business as usual approach should be taken whilst
observing the pre-election publicity guidance. 
After considering the advice of the Monitoring Officer, Councillor McLennan moved
that the Council defer the report “Moray Council Biodiversity Strategy 2026-2036”
until the next meeting of Moray Council on 30 June 2026. This was seconded by
Council van der Horn. 
Councillor Macrae moved that the Council proceed to consider the report. Councillor
Dunbar seconded this. 
On a division there voted: 
For the Motion (5): Councillors McLennan, van der Horn, Fernandes, Harris
and Stuart 
For the Amendment (15): Councillors Macrae, Dunbar, Allan, Bloomfield, Colyer,
Cowe, Divers, Gatt, Gordon, Keith, Kirby, Mustard,
McBain, Ross and Robertson 
Abstentions (5): Councillors Cameron, Coull, Lawrence, Morrison and
Warren 
Accordingly, the Amendment became the finding of the meeting, and the Council
agreed to proceed to consider the item. 
Councillor McLennan asked that his dissent be noted and left the meeting at this
juncture. 
Councillor Macrae welcomed the Biodiversity Strategy 2026-2036 and moved that the
Council agree the recommendations as printed within the report. Councillor
Robertson seconded this.  
There being no-one otherwise minded, the Council unanimously agreed:  
Page 10

Page 11

(i) to note responses received to the draft Strategy as set out in Appendix 1 of the
report; 
(ii) the final version of the Strategy as set out in Appendix 2 of the report; 
(iii) to delegate authority to the Head of Growth, Planning and Climate to make
minor editorial changes to the Strategy; and 
(iv) to approve continued support for the North East Scotland Biodiversity
Partnership for the next three years. 
10.         Forres Academy Town and Country Planning (Scotland) Act 1959 (as
amended) 
Under reference to paragraph 9 of the Minute of the meeting of Moray Council dated
21 January 2025, the meeting had before it a report by the Executive Director
Education, Housing and Communities asking the Council to consider the  outcome
from the recent consultation relating to open space which will be appropriated or
disposed of for the purposes of the relocation of Forres Academy in terms of Section
24(2A) and Section 27(2A) of the Town and Country Planning (Scotland) Act 1959 (as
amended).  
The Council joined the Chair in thanking the residents and community of Forres for
their participation in the consultation and thereafter unanimously agreed:  
(i) to note the outcome of the public consultation in relation to the disposal and
appropriation of Council land to support construction and operation of
proposed new build Forres Academy; and 
(ii) to appropriate or dispose of the land identified for the purposes of relocating
Forres Academy. 
11.         Financial Regulations Review 2026/27 
Under reference to paragraph 27 of the meeting of Moray Council dated 25 June 2025,
the meeting had before it a report by the Executive Director Finance Strategy and
Transformation asking Council to approve changes to the Council's Financial
Regulations.  
Following consideration, the Council unanimously agreed to approve the revised
Financial Regulations as set out in Appendix 1 of the report.  
12.         Emergency Planning Annual Report Jun 2024 – May 2025 and May 2025 -
April 2026 
The meeting had before it a report by the Executive Director Economy, Enterprise and
Operations asking the Council to note the policy statement on Emergency Planning
and note the progress made on Emergency Planning work that has occurred from the
beginning of June 2024 to the end of April 2026.  
The Council joined the Chair in commending the work of Community Council’s in
relation to emergency planning and unanimously agreed to note the:
Page 11

Page 12

(i) policy statement on Emergency Planning and Response as set out in the report;
and 
(ii) progress made on Emergency Planning work undertaken between June 2024
and April 2026. 
13.         Moray Growth Deal Cultural Quarter project - Update on phase 2 activity
[Para 7 and 9] 
Under reference to paragraph 25 of the Minute of the meeting of Moray Council dated
4 December 2024, the meeting had before it a report by the Executive Director,
Economy, Enterprise and Operations providing a detailed summary of work
undertaken by the Project Team regarding this phase of activity and seeking approval
of a decision regarding next steps. 
Councillor Macrae welcomed the report and moved that the Council agree the
recommendations as set out in the report. Councillor Robertson seconded this.  
Thereafter, the Committee unanimously agreed to:  
(i) note the progress made by the Cultural Quarter project team with regard to CQ
phase 2 (Grant Lodge); and 
(ii) extend the scope of ‘at risk’ activity to the end of RIBA 4 stage to include the
commencement of a 2 stage procurement process during this design phase
whilst noting that the Council’s financial liability for ‘at risk’ spend will remain
as agreed in December 2024 (£990k). 
14. Order of Business 
The Chair sought the agreement of the Council to vary the order of business and take
Item 13 “Housing Lhanbryde” ahead of Item 12 “Energy from Waste End of Project
Report” to allow the officer presenting the report to attend a previously arranged
appointment. This was agreed. 
15.         Housing Lhanbryde [Para 7 and 9] 
Under reference to paragraph 13 of the Minute of the meeting of Moray Council dated
25 February 2026, the meeting had before it a report by the Executive Director
Education, Housing and Communities asking the Council to authorise acceptance of
the financial terms associated with a housing opportunity in Lhanbryde. 
During her introduction, the Service Manager Housing Strategy advised of an error in
the table at paragraph 7.2 of the report which should read as follows: 
2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 Total
HRA
Prudential
borrowing
(Capital)
£0.002m £0.006m £0.000m £0.000m £1.201m £0.000m £1.210m 
Page 12

Page 13

Following consideration, the Council unanimously agreed to:  
(i) note the amendment to the figures in the HRA Prudential borrowing (Capital); 
(ii) endorse a strategic partnership between the Council and a utility provider, and
their Tier1 Sub-contractor or any successor sub-contractor, to deliver
temporary workforce housing that transitions into long-term affordable rented
homes; 
(iii) the prudential borrowing associated with the agreement to purchase properties
as detailed in Paragraphs 7.3 and 8.4 of the report; 
(iv) enter into a legal agreement with a local housebuilder to purchase 19
properties in Lhanbryde, and instruct the Head of Housing, Property and
Communities and the Service Manager Legal Services to agree any other terms
in order to protect the interests of the Council; and 
(v) note that progress on the delivery of the Council’s new build programme will be
reported to a future meeting of the Housing and Community Safety Committee. 
16.         Energy from Waste End of Project Report [Para 7] 
Under reference to paragraph 7 of the Minute of the meeting of Moray Council dated
18 December 2018, the meeting had before it a report by the Executive Director
Economy, Enterprise and Operations informing the Council of the completion of the
construction of Ness Energy from Waste Facility (EFW) and providing an update on
current contractual arrangements.  
Following consideration, the Council unanimously agreed:  
(i) to note the contents of the report; and 
(ii) that the project to construct an Energy from Waste Facility is now complete. 
Page 13

Page 14

Page 14

Page 15

MORAY COUNCIL 
Minute of Special Meeting of the Moray Council 
Tuesday, 19 May 2026 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Councillor James Allan, Councillor Peter Bloomfield, Councillor Neil Cameron,
Councillor Tracy Colyer, Councillor Theresa Coull, Councillor John Cowe, Councillor
John Divers, Councillor Amber Dunbar, Councillor Jérémie Fernandes, Councillor
Donald Gatt, Councillor David Gordon, Councillor Juli Harris, Councillor Sandy Keith,
Councillor Elaine Kirby, Councillor Scott Lawrence, Councillor Marc Macrae, Councillor
Paul McBain, Councillor Shona Morrison, Councillor Bridget Mustard, Councillor
Kathleen Robertson, Councillor Derek Ross, Councillor John Stuart, Councillor Draeyk
Van Der Horn, Councillor Sonya Warren 
APOLOGIES 
Councillor Neil McLennan, Councillor Ben Williams 
IN ATTENDANCE 
Chief Executive, Executive Director Finance, Strategy and Transformation, Executive
Director Education, Housing and Communities, Executive Director Economy,
Enterprise and Operations, Chief Financial Officer, Head of Education, Head of
Housing, Property and Communities, Chief Monitoring Officer, Service Manager
Education Estate, Service Manager Legal Services and Service Manager Democratic
Services. 
1.         Declaration of Group Decisions and Members Interests 
In terms of Standing Orders 21 and 23 and the Councillors' Code of Conduct, there were
no declarations from Group Leaders or Spokespersons in regard to any prior decisions
taken on how Members will vote on any item on the agenda or any further declarations of
Member's interests in respect of any item on the agenda.    
2.         Resolution 
The meeting resolved that in terms of Section 50A (4) and (5) of the Local Government
(Scotland) Act 1973, as amended, the public and media representatives be excluded
from the meeting for Item 4 of business on the grounds that it involves the likely
disclosure of exempt information of the class described in the relevant Paragraphs of
Part 1 of Schedule 7A of the Act.  
Para
Number of
the Minute
Para Number of Schedule 7a 
3 Para 8
Item 4b.
Page 15

Page 16

The amount of any expenditure proposed to be incurred by the authority
under any particular contract for the acquisition of property or the supply
of goods or services. 
Para 9
Any terms proposed or to be proposed by or to the authority in the course
of negotiations for a contract for the acquisition or disposal of property or
the supply of goods or services. 
3.         Forres Academy Project Update [Para 8 & 9] 
The meeting had before it a report by the Executive Director Education, Housing and
Communities providing  an update on the Future Forres Academy new build project and
the supporting Full Business Case presenting the cost and funding arrangements and to
seek approval to enter a Design and Build Development Agreement with hub North
Scotland Limited to deliver the project.  
The Chief Governance Officer updated the Council to state that the Court of Sessions
had not yet provided the interlocutor in respect of the Common Good land but felt that
the Council could still approve the recommendations in front of them with a caveat for
recommendation iv) that it was subject to Court approval in relation to the use of
Common Good land.  
Following consideration the Council unanimously agreed to:  
i) Approve the hub North Scotland Limited (hNSL) Fixed Price of £88.638m for
Future Forres Academy delivery of the design and construction project (para 5.9,
para 6.1 B); 
ii) Approve the updated authority costs allowance of £3.8m for the project (para
5.10, para 6.1B);     
iii) Note the increase in the overall project budget from £91.5m to £92.438m to
reflect project cost pressures arising from Middle East conflict-related market
conditions and steel import tariffs and approve a £1m capital virement from the
core Learning Estate capital budget to mitigate this and other residual risks
(para 5.4 to 5.10; para 6D);     
iv) Approve entry into Design and Build Development Agreement (DBDA) contract
with hub North Scotland Limited to deliver the Future Forres Academy project
(para 6.10 to 6.12), subject to Court approval in relation to the use of Common
Good land;     
v) Authorise the Executive Director Education, Housing and Communities (or in
their absence the Head of Housing and Property) to sign all contractual
documentation required to progress the project on behalf of the Council (para
7.3);     
vi) Note the estimated through life operational costs for operating the new school
and maintaining the building condition and energy efficiency metrics to meet
Learning Estate Investment Programme Phase 3 phased funding over next 25
years (para 7.4);    
Page 16

Page 17

vii) Note that the commercial close for the project is targeted for 22 May 2026 to
facilitate project construction mobilisation from 25 May 2026 (para 5.16);       
viii) Agrees that the project proceeds to construction phase subject to the Court of
Session ruling on appropriation of common good land and commercial
agreement (para 7.3); and 
ix)  Note that a site licence is required for the temporary contractor’s compound on
Common Good land, and agree that, instead of a charge being paid to the
Council for use of the land, a payment of £6,500 be made to the Forres Common
Good Fund (para 5.14). 
Page 17

Page 18

Page 18

Page 19

Report to: Moray Council  Meeting Date: 30 June 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Nicola Moss Contact Email: nicola.moss@moray.gov.uk 
Subject: Portgordon School Bus Service Petition 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider the recently submitted Petitions PE2026-001 and
PE2026-002 in relation to school transport for Portgordon.  
1.2  This report is submitted to Council in terms of Section I (3) of the Council’s Scheme of
Administration the petitions relating to a decision of the Council 
2.  SUMMARY  
2.1  Petition PE2026-001 was received from Iona Shewan on 6 May 2026 and is set out at
Appendix 1. Petition PE2026-002 was received from Ianthe Mitchell, Jack Pickerill and Yvie
Shewan on 6 May 2026 and is set out at Appendix 2. As both petitions relate to the same
matter and have substantively the same ask this report serves in relation to both petitions.  
2.2 Summary Petition Request
Reinstate the school bus provision between Portgordon and Buckie High School.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Council:   
i)  Consider the report and petition set out below; and   
ii)  Agree one of the options below:
• direct that the petition (in whole or part) proceed to a full hearing, at
the next available date of that service committee, another appropriate
service committee or full council, at which a further report will be
presented by officers detailing the full background to the petition and
addressing any issues of particular interest to members; 
• reject the petition (in whole/part) stating reason; 
• for simple issues instruct immediate action by the council without any
further hearing or report; 
Item 6.
Page 19

Page 20

• pass the petition to the relevant Executive Director and chairperson to
look into, with or without any specific direction as to action.   
Nicola Moss
Head of Operations and Environment 
4.  PETITION DETAILS  
4.1  Title of Petition 1
Save our BHS Bus  
4.2  Petitioner 1
Iona Shewan  
4.3  Petition Statement 1:
We respectfully request that Moray Council reinstate the dedicated school bus service for
children and young people from Portgordon. 
The current walking route provided to families is unsafe. It requires walking along an unlit
60mph road, in close proximity to sea and surface water, and along narrow sections with
poor visibility for drivers and pedestrians. The path is too narrow in places, forcing users to
step onto the road to pass others. During darker winter months and adverse weather
conditions, these risks increase significantly. The pathways are unlit, untreated in icy
conditions, and exposed to severe wind and sea spray. 
The path leading to the old railway bridge is poorly maintained, with multiple trip hazards
including rotten wooden steps and unstable or missing fencing. The steps are not made of
non-slip materials. We do not believe this route is a safe or reasonable option for school
children. 
The alternative public bus service is unreliable. Buses are often delayed, overcrowded, or
cancelled at short notice. Timings do not align with the school day, with the morning
service arriving far too early and the afternoon service departing long after school finishes.
In poor weather, services are frequently cancelled, and there are no sheltered bus stops
near the school. 
The previous dedicated school bus ensured safe, timely travel and reduced congestion.
We therefore ask the Council to reinstate this essential service. 
4.4 Title of Petition 2
This petition is to try and stop the council from withdrawing school transport from
Portgordon to Buckie High School.  
4.5 Petitioner 2 (Young Persons’ Petition)
Ianthe Mitchell, Jack Pickerill, Yvie Shewan 
Page 20

Page 21

4.6 Petition Statement 2
This petition is to try and stop the council from withdrawing school transport from
Portgordon to Buckie High School as the ‘safe walking route’ is not safe. The path runs next
to a 60mph road which is unlit and then carries on to a Victorian Bridge which was in a
report last year found to have been neglected, with severe corrosion and in need of
maintenance. The Stagecoach service is not reliable and with an increasing rate of anti-
social behaviour and violence on buses a large amount of people do not feel safe to ride
on a bus. This will impact significantly on pupil attainment during periods of cold/icy
weather. Roads/pavements in Portgordon do not get gritted which would make the walk
very unsafe for pupils to take as they may fall an injure themself. Stagecoach buses
usually get cancelled when there is very bad weather and so pupils would be unable to
arrive to school safely. 
5.  BACKGROUND AND CONTEXT  
5.1 Section 51 of the Education (Scotland) Act 1980 places a duty on local authorities to
‘make such arrangements as they consider necessary’ for the provision of school
transport. School transport can mean free transport by bus or other vehicle, by providing
bicycles or by paying some/all travel costs. Further, local authorities must have regard to
the safety of pupils. 
There is no legal maximum distance between home and school beyond which transport
must be provided, however, if there is no school transport provision for a child under 8
living more than 2 miles from their designated school, or for a child aged 8 and over living
more than 3 miles from their designated school using the “nearest available route” then
this would be deemed a reasonable excuse for parents not ensuring the attendance of
their child at school. This means that in general, local authorities provide school transport
within these distance limits. 
The statutory concept of “nearest available route”, considered alongside the requirement
for a local authority to have regard to the safety of pupils,  is commonly referred to in
practice as a “safe walking route”. Case law has defined that for a route to be ‘available’ it
“must be a route along which a child accompanied as necessary can walk and walk with
reasonable safety to school. It does not fail to qualify as ‘available’ because of dangers
which would arise if the child is unaccompanied”. 
Parents remain responsible for their child’s journey to and from school when not on school
transport, or to and from a designated pick-up point for school transport.  
5.2 The policy position for school transport, agreed at the meeting of Council on 24
September 2025 (para 14 of the minute), is summarised as follows:
a) The Council will provide school transport at no cost to pupils attending their zoned
school where
i) For primary school pupils the journey from home to school is greater
than 2 miles
ii) For high school pupils the journey from home to school is greater
than 3 miles
iii) For pupils where there is no safe walking route from home to school
b) Where transport is provided pupils may still be expected to walk up to 2 miles
(primary) or 3 miles (secondary) to access school transport.
c) The Council is responsible for determining whether there is a safe walking route.
Page 21

Page 22

d) The Council is required to have regard to safety relating to school transport
arrangements but there are no specific requirements or processes to be followed.
e) Should a pupil have individual support needs or mobility restrictions that preclude
walking an otherwise safe walking route (or accessing the routine school transport
provision) then transport needs will be met separately through existing processes.
f) It is parental responsibility to ensure safety of pupils on their journey to school or
to/from the pick up point for school transport.
g) Contracted / Council operated home to school transport routes may also be
registered as public bus services. 
5.3 The Council in its Scheme of Delegation places the responsibility for the provision of a
school transport service in accordance with the Education (Scotland) Act 1980 with the
Head of Operations and Environment. Further, it was clarified in setting the revised school
transport policy in September 2025 that any dis-satisfaction with a walking route should
be raised via the Public Transport Unit, firstly for review by the Service Manager
Transportation and secondly (where necessary) by the Head of Operations and
Environment. There has been considerable correspondence between the petitioner and
officers, including a full review of the assessment of the walking route. 
5.4 Considerations for assessing an appropriate walking route include the following:
• Continuous adequate public footway on major roads. This can be pavement or
cinder type path or a cleared and unobstructed grass verge/path.
• A suitable route could also be an established active travel route which may not be
adjacent to a road.
• On minor routes, the width of the carriageway, potential traffic speed, volume of
traffic as well as visibility/sight lines which can be impacted by sharp bend,
woods/hedges or other obstructions must be considered. Adequate step offs onto
a suitable verge should be available as walking will normally occur on carriageway
of a minor road. 
• Good visibility of oncoming traffic on walking route, and at bus transport pick up
point when relevant.
• Where a road needs to be crossed, consideration taken of traffic flow and sight
lines to allow opportunities to cross safely where no formal crossing infrastructure
is in place.
• An absence of street lighting does not make a route unsafe.  
5.5 There is guidance provided in both the Scottish Government School Transport Guidance
and Road Safety GB’s Guidelines for the Assessment of Walked Routes To School. The
Scottish Government guidance sets out an overview of a range of topics relating to school
transport. Nowhere does the guidance state specific requirements for street lighting,
footpath width or mitigation against weather. The Road Safety GB guidance is widely used
across Scotland and the UK by local authorities. It sets out detailed and practical
resources for the assessment of walking routes with clear information on legal
responsibilities and a detailed methodology for assessing walking routes. For the context
of this report, the guidance is clear that if there is:  
a) continuous footway on roads which carry normal to heavy traffic (heavy traffic being
over 840 vehicles per hour); and that; 
b) where there is a need to cross roads there is sufficient gaps in the traffic flow and
appropriate sight lines or crossing facilities. Two way traffic flow less than 240 vehicles per
Page 22

Page 23

hour is deemed safe to cross;
then a route would be classed as non-hazardous. 
The guidance can be summarised as follows:
• a route’s safety is assessed on the basis of a child being accompanied as
necessary. 
• there is a presumption that all road users will behave reasonably and responsibly.
• the presence or absence of street lighting on a route is not considered to be a
factor
• the accident and road casualty record for the route should be taken into
consideration. The existence of an accident record does not necessarily indicate
that the route is unsafe for the journey to school – this would depend on the type,
nature and relevance of the incidents
• where the two way traffic flow is below 240 vehicles per hour the road is assessed
as safe to cross
• a footway is one that is of adequate usable walking width for the circumstances
• sight lines are important when crossing the road or walking along the roadway (note
this is walking in the carriageway, not on a footway) so that pedestrians and drivers
have time to see oncoming vehicles / pedestrians walking across or in the
carriageway and both to take avoiding action
• when assessing the safety of an available route only the potential risk created by
traffic, the road and topography should be considered
• a footway, roadside strip of reasonable width & condition, or public footpath will all
normally be assumed to provide an available route for that part of the journey 
• The guidance has detail on adequate routes where walking in the carriageway is
required and the nature of rural routes with no / non-continuous footways,
however, this is not set out further in this report as it is not applicable  
5.6 The route between Portgordon and Buckie High School is as follows:
• The route has continuous adequate footway for the full extent of the route. On the
section alongside Great Western Road, which is the area of footpath highlighted as
of concern, the footpath is 1.5m wide throughout. 
• Crossing points have good visibility sightlines and are in areas where the traffic
flows are low – below the default view from Road Safety GB that traffic flows up to
240 vehicles per hour are by default safe to cross
• The recorded collisions on the route to school are very low, with no pattern nor any
indication of a specific hazard towards pedestrians. There is only one recorded
incident in the last 5 years from Police Scotland records.
• Vehicle speeds are of particular relevance at crossing points, however, both the
average and 85th percentile speeds (85th percentile being the upper end of the
distribution of recorded speeds and representative of vehicles travelling at higher
speeds than most others) based on up to date information are well below the
speed limit for the road. There are a range of surveys which corroborate this, most
recently a ‘tube survey’ of all vehicles over a 7 day period from 21 – 28 May 2026, in
the centre of the 60mph stretch of A990, Great Western Road. In this survey the
average of all vehicle speeds over a 7 day period is 46.8mph, with an 85th percentile
speed of 56mph. The data for journey to school times is consistent with these
values.
• Traffic volumes are considered in relation to any requirement to walk in the
carriageway of the road, which is not the case on this route, however, both at
Buckpool and Portgordon the combined traffic flows are well under 240 vehicles
Page 23

Page 24

per hour which is considered lightly trafficked (the lowest flow is Portgordon in the
morning at 113 vehicles per hour, and the highest is at the Yardie in Buckpool, to
the east of the recommended road crossing point, at 212 vehicles per hour in the
afternoon)
• In relation to other factors:
o The footbridge on the route required minor improvement works to the
handrail and to remove excess vegetation, these works were carried out
during the Easter school holidays. Additional lighting at the bridge is being
considered as a reasonable further mitigation albeit not required by policy
or guidance. The footbridge has been regularly inspected, most recently in
February 2026.
o There is no evidence of sections of the route experiencing flooding, and no
roads defects that would lead to excessive standing water.  
5.7 Across Moray many ‘walking routes’ used to determine whether school transport is
provided for some or all of the journey to school are in very rural areas, not just in
settlements but in remote locations too. In remote locations these walking routes are
normally to the pick up point for school transport as the home address can be many miles
from school. These walking routes can routinely be of material length along unlit single
track roads. There are also other walking routes along pavements adjacent to high speed
high volume roads, such as the A95. Whilst it remains the case that there is no
requirement to use a walking route, walking routes of all lengths can be exposed to poor
weather conditions. Parents are responsible for ensuring that their pupils have suitable
clothing, footwear, reflective clothing or other visibility aids appropriate for the weather
conditions. This is already an established principle. 
6.  RECOMMENDATIONS / IMPLICATIONS OF CARRYING OUT REQUESTED ACTIONS  
6.1 Whilst there is no doubt that a material change in the provision of school transport such as
this presents as an unwelcome change to families affected, viewing the assessment in
line with all other decisions relating to the provision of school transport, there are no
extraordinary features that mean that school transport should be provided. In making such
a decision this is not instructing that pupils must walk to school, but that parental
responsibility for the whole (or part) of the journey to school applies. 
6.2 The assessment indicates that there are no factors which render the route unsafe for an
accompanied child. Whether the route is suitable for a child to walk unaccompanied
remains a decision for parents to make, in line with any other walking route. 
6.3 Alternative means of transport to school (in addition to private car use) are:
• Cycling – Portgordon to Buckie is part of the NCN1 (National Cycle Network), using
parts of the old railway line as well as the A990
• Alternative paths including the Moray Coast Path and other minor paths running
parallel to the coastline
• Stagecoach 35 service: the service currently departs Portgordon at 0749 arriving
Buckie East Church Street at 0759. In the afternoon the bus departs East Church
Street at 1620 and arrives in Portgordon at 1630. From August 2026 the service will
depart Portgordon 15 minutes later in the morning at 0804, arriving Buckie East
Church Street at 0814. The revised afternoon service will depart East Church Street
10 minutes earlier at 1610 and arrive in Portgordon at 1620. All pupils are eligible
for free bus travel using the Under-22 concession card. Capacity has been checked
with Stagecoach and there is capacity on these particular services to
Page 24

Page 25

accommodate the number of pupils travelling to and from school.
• m.connect: where there is not a suitable timetabled service, the m.connect service
on-demand can also be booked (subject to availability) using the m.connect app up
to 2 weeks in advance and also accepts the Under 22 free bus pass. 
Mitigations
6.4 Buckie High School opens at 0800h in the morning for pupils to access the Breakfast Club
at the school which provides breakfast in the canteen area in a supervised environment at
no charge to pupils. After school pupils can use the seated area around reception until
1600h if they are waiting for a bus or other transport.  
6.5 Given the A990 is also an active travel route as part of the NCN1, where cyclists are
expected to cycle in the carriageway along parts of the road (as well as off-road on the
Moray Coast Path) then there are avenues which can be explored for further physical
measures that support additional improvements to the road environment to promote
active travel. These could include additional vegetation management, line marking /
carriageway designations and the potential to reduce the speed limit to 50mph. The option
to close Gibbs Lane to vehicular traffic to provide an alternative to the bridge crossing is
also being developed. These options need further appraisal, and would need funding
identified to deliver. They may go some way to alleviate concerns without altering the core
position in relation to the route being correctly appraised as available. 
7. PETITIONS PROCESS  
7.1 In terms paragraph 8.4 of the Council Guidance for considering petitions this is the
preliminary hearing for each petition. 
7.2 The petitioners have been invited to the meeting to speak on behalf of their petitions.  The
process allows them 5 mins each.   
7.3 The report author will then be invited to respond, based on this briefing report. 
7.4 The Council should then discuss, as appropriate, the merit of the petition and may decide
as follows:-.  
7.5 The child-friendly petitions process amends the manner in which a petition is submitted
by those under the age of 18. However, once submitted, child-friendly petitions are
handled in the same way as other petitions.  
7.6 Council will then decide as follows:- 
• Direct that the petition (in whole or part) proceed to a full hearing, at the next
available date of that service committee, another appropriate service committee or
full council, at which a further report will be presented by officers detailing the full
background to the petition and addressing any issues of particular interest to
members; 
• Reject the petition (in whole/part) stating reason; 
• For simple issues instruct immediate action by the council without any further
hearing or report; 
• Pass the petition to the relevant director and chairperson to look into, with or
without any specific direction as to action.  
Page 25

Page 26

8. CONSIDERATIONS AND FINANCIAL IMPLICATIONS  
8.1 The Council welcome the interest of the signatories.  
8.2 
8.3 
8.4
The decision to assess individual walking routes and determine their availability and
safety has been delegated to Officers under the Council’s Scheme of Delegation. In
exercising these functions, Officers are required to apply the Council’s approved policy
consistently and objectively. 
While Councillors remain free to review or amend the underlying policy, it would not be
appropriate to reinstate transport provision for a single route where the policy has been
correctly applied, as this would risk inconsistent decision-making and potential challenge. 
Councillors may, however, seek assurance that the policy has been properly applied in
this case, including the robustness of the route safety assessment and whether all
relevant factors have been taken into account. 
Page 26

Page 27

Page 27

Page 28

Page 28

Page 29

Page 29

Page 30

Page 30

Page 31

Page 31

Page 32

Page 32

Page 33

Page 33

Page 34

Page 34

Page 35

Report to: Moray Council  Meeting Date: 30 June 2026  
Report by: Executive Director Economy, Environment and Operations  
Authors: Rod Lovie  Contact Email: Rod.Lovie@moray.gov.uk 
Subject: Moray Council Climate Change Strategy 2026-2036 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to ask the Council to note responses to the draft Moray
Council Climate Change Strategy (CCS) and approve the final version of the Strategy.  
1.2  This report is submitted to Council in terms of Section III (F) (33) of the Council’s Scheme
of Administration relating to review or prepare a Climate Change Strategy to provide a
framework for actions aimed at reducing carbon emissions and actions to restore
biodiversity for submission to the Council. 
2.  SUMMARY  
2.1  The Council’s Climate Change Strategy 2026-2036 sets out how the Council will respond
to its statutory duties to reduce carbon emissions, adapt to the impacts of climate
change, and to embed sustainable principles within the Council. The strategy was
developed through an Officer/Elected Member working group and sets out a target of 2045
for the Council to achieve net zero from its corporate emissions and puts forward a series
of four carbon budgets for the Council, each spanning five years from 2025-2045. 
2.2 The feedback from the public consultation is included in Appendix 1. This feedback has
been integrated into a proposed final version of the Strategy which is included in Appendix
2. A final action plan for the CCS is included in Appendix 3, and the Integrated Impact
Assessment (IIA) in Appendix 4.  
3.  RECOMMENDATIONS  
3.1  It is recommended that the Council:   
Item 7.
Page 35

Page 36

i)  note responses received to the draft Strategy set out in Appendix 1; and 
ii)  approves the final version of the Climate Change Strategy 2026-2036, as set
out in Appendix 2 and the action plan in Appendix 3   
Rod Lovie
Principal Climate Change Strategy Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Climate change is a significant and escalating threat to Moray’s natural environment,
people, and economic wellbeing. The impacts of climate change are already being felt.
These will continue to worsen, posing major challenges for both current and future
generations, ecosystems, infrastructure and key sectors including food and drink,
agriculture and tourism. 
4.2  The Climate Change (Scotland) Act 2009 requires the Council to respond to these
challenges by reducing greenhouse gas emissions, adapting to the changing climate, and
to act in a way considered most sustainable. The Council must report on compliance with
these duties annually.  
4.3  On 27 June 2019, the Council declared that climate change is an ecological emergency
and that it needs to take action to reduce carbon emissions (para 6 of the Minute refers).
Furthermore, on 2 February 2023 (para 9 of the Minute refers), the Council declared a
nature emergency which recognised the value and role of nature in achieving climate
targets, maintaining a strong economy and protecting the health and wellbeing of future
generations.  
4.4  The Council approved its Climate Change Strategy 2020-2030 on 10 March 2021 (para 13
of the Minute refers). The Climate Change Strategy set out how the Council will respond to
its statutory duties to mitigate carbon emissions, improve community adaptation and
resilience, and to embed sustainable principles at every level of its operations. An update
on the progress of this strategy is provided annually in the Climate Change Update and
Routemap to Net Zero. 
4.5  On 24 September 2025, the Council approved a draft of the Climate Change Strategy
2025-2035, (para 12 of the Minute refers). Following this approval, the draft was made
available for public consultation on Moray Engage for a period of 12 weeks. 
5.  CONSULTATION  
5.1 Ten survey responses were received through Moray Engage. These have been summarised
and responded to in Appendix 1, noting where changes have been made to the final
Strategy. The low level of engagement is disappointing and efforts to better publicise
future consultations in Moray Engage are being explored. 
Page 36

Page 37

5.2 The majority of comments received were constructive and a number of changes were
subsequently made to the strategy. These include :
• Highlight the twin crises and the alignment with the Biodiversity Strategy in the
summary. This was included in the summary and the link to the Biodiversity
strategy highlighted through the document.
• Set out where the Climate Change Strategy sits within the hierarchy of Council
policies. This has been included in section 3.2 by highlighting that Climate change
action is included within the Moray Council Corporate Plan 2024, and in other
relevant Moray Council strategies.
• Improve wording introducing the principles, as well as improve wording of the
principles themselves in Section 5. These were clarified and the wording simplified.
Specific examples here were removed as this was causing confusion and examples
of actions are now included in Section 7.
• Greater clarity on the changes needed to achieve the carbon budgets and link to
actions. Revisit assumptions behind the budgets and improve explanation about
budgets. Section 6.1 was expanded with more explanation about the assumptions
which make up the budgets, additional graphs, and an expanded explanation of
each of the separate 5 year budgets. There was also a summary table showing the
scale of progress which may be needed to stay within the budgets added to the end
of the section. 
5.3 The responsibilities set out in the final strategy (Section 8 under Roles and
Responsibilities) reflect the Roles and Responsibilities definitions agreed by Council in
December 2024. Political leadership and accountability for the Council’s climate agenda
shall rest with the Chair of the EDIS Committee who has responsibility for strategic
leadership, policy oversight, and accountability on climate change, while the elected
member Climate Champion's role is focused on advocacy, engagement, and awareness-
raising. 
5.4 Other changes included tidying up and simplifying the language in the document,
additional works to agree wording of actions with action holders, and updating the
glossary. Comments received which were not relevant to ammending specific parts of the
strategy are also replied to in Appendix 1. 
5.5 If approved, the Strategy will be finalised in a more accessible format with photographs
and published on the Council website.  
6.  SUMMARY OF IMPLICATIONS  
6.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT Yes No
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ☒ ☐
Policy and Legal ☒ ☐
Financial ☒ ☐
Page 37

Page 38

Risk ☒ ☐
Staffing ☒ ☐
Best Value and Transformation ☒ ☐
Property ☒ ☐
Information Communications Technology/Digital ☐ ☒
Equalities. Social Inclusion and Economic Impact  ☒ ☐
Climate Change and Biodiversity Impact ☒ ☐ 
6.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population 
6.3 Policy and Legal 
The Council is required to act on a variety of statutory duties related to climate change. 
Climate Change (Scotland) Act 2009 places a legal duty on public bodies to act in the way
best calculated to contribute to the delivery of Scotland’s climate change targets; in the
way best calculated to help deliver any programme for climate change adaptation laid
before the Scottish Parliament; in a way it considers most sustainable. 
Local Government in Scotland Act 2003 places Best Value duties on the Council which
include contributing to the achievement of sustainable development through continuous
improvement in performance. 
Nature Conservation (Scotland) Act 2004 places a duty on the Council to consider
biodiversity in its decision-making processes and to promote the conservation of local
habitats and species. 
Page 38

Page 39

In addition, climate change is increasingly being embedded in all government policies
ranging from infrastructure delivery to energy policy, and these are likely to influence the
Council’s work moving forward.  
6.4 Financial 
There are significant difficulties in funding the necessary climate change work from
existing resources. The Zero Emission Fleet Replacement Strategy details the Council’s
plans to decarbonise the remainder of the fleet in line with the Scottish Government’s net
zero targets. However, infrastructure limitations and affordability for these plans is a
challenge. The Council capital  budget has been reduced which has led to a reduction of
EV replacements.  The Zero Emission Fleet Replacement Strategy is being further
reviewed to take account of the changes in capital budget and any spend-to-save
opportunities. 
Currently capital budget managers across all asset groups have been tasked with
embedding sustainability within their asset plans. 
Additional external funds are required if the Council is to deliver its plans for
decarbonisation and adaptation across the organisation. Although there are significant
challenges to fund decarbonisation actions, there are significant opportunities to lever in
funding for these, as recognised in this report. 
6.5 Risk 
Climate change is a serious risk to the Council’s service provision. It poses significant
risks to our health, our economy, our environment and endangers the wellbeing of current
and future generations. 
There is a risk that the Council’s statutory obligations and targets will not be met if the
actions within the Climate Change Strategy 2026-36 are not progressed as a priority,
recognising the role of external funding in that process.  
6.6 Staffing
Insufficient internal capacity and funding may delay key projects or opportunities to
leverage funding. Groundwork to strengthen the Council’s position for advancing
decarbonisation projects and external funding is principally led by officers in Strategic
Planning and Development, Housing and Property, and Transportation. These services are
under significant workload pressures.  
6.7 Best Value and Transformation 
Contributing to the achievement of sustainable development through continuous
improvement in performance is a key component of the Council’s Best Value duties set
out by the Local Government in Scotland Act 2003. Achieving sustainable development
means meeting the needs of the present without compromising the ability of future
generations to meet their own needs. Actions to progress this are monitored through
committee. 
6.8 Property
Page 39

Page 40

The development of decarbonisation projects will impact corporate buildings, council
landholdings and the learning estate. 
Any Council landholdings identified as potentially suitable for natural capital projects will
be assessed on a case-by-case basis in collaboration with key stakeholders. 
6.9 Information Communications/Technology/Digital 
No implications arising from this report.  
6.10 Equalities, Social Inclusion and Economic Impact 
An integrated impact assessment (IIA) has been developed and is available at APPENDIX
4. While some potential indirect or unintended negative impacts have been identified,
these are not considered significant or disproportionate. Climate change will impact on
every service area of the Council. By considering climate change across services, it is
possible to deliver positive equalities and socio-economic impacts while supporting
human rights and the rights of the child. Climate action is integral in progressing the
Council’s corporate priorities of tackling poverty and inequality, building a stronger greener
economy, and building thriving, resilient, empowered communities. 
Climate change will lead to more extreme weather events in Moray which will have a
disproportionate impact on those already in poverty or are unable to adapt to this change.  
6.11 Climate Change and Biodiversity Impacts 
This report focuses attention on the actions required to ensure that the Council meets its
statutory obligations and targets. Reducing carbon emissions, restoring nature and being
ready for climate impacts are necessary steps to act on the climate and nature emergency
and show local leadership in line with statutory duties. 
7.  CONSULTATION  
7.1 This report has been prepared in consultation with the Executive Director Economy,
Environment and Operations, Chief Financial Officer, Chief Governance Officer, Head of
Growth, Planning and Climate, Service Manager Democratic Services, and any comments
made have been incorporated into the report. 
8.  BACKGROUND PAPERS  
Climate Change Strategy 2020-2030 
Route Map to Net Zero Update 2026 
Biodiversity Strategy (Draft) 
Adaptation Benchmarking Report 
Page 40

Page 41

Appendix 1
7
CCS Update 2026-2036: analysing public consultation responses
Type of respondent:
1. Moray resident 6
2. Community group 1
3. Community Council 1
4. Statutory body 1
5. Council staff or elected member 1 
Awareness of what the council does in terms of CC mitigation and adaptation (drop-down menu was provided):
Introducing electric vehicles into the council’s fleet 9
Reducing the use of electricity e.g. through LED lighting
replacement
8
Diverting new waste from landfill 7
Reducing commuting emissions through hybrid working 5
Embedding nature in plans and decisions 5
Implementing Coastal Change and Adaptation Plans 4
Embedding sustainability in plans and decisions 3
Increasing understanding of, and action taken on, services impacted by
climate related events such as severe weather
3
Reducing the use of gas oil in council buildings 2
Including sustainability, emissions reductions and other non-cash benefits
in council contracts
1
Page 41

Page 42

Appendix 1
8
The responses are arranged thematically, considered, and any relevant actions to update the CCS highlighted. 
Comments MC response Action for the CCS
Objectives
[The Council] should be concentrating on delivery of
worthwhile frontline services that benefit the public
instead of hindering everyday life with schemes that won’t
be used or won’t work effectively. 
(on emission targets) No, but there is nothing we can do
apart from not spend any money on decarbonisation
unless in existing budgets or is funded by the SG.
(on emission targets) But little is actually being
implemented.
(on the principles) A wish list. 
(on adaptation) The money being spent on
decarbonisation should be used instead for improvement
of infrastructure to cope with short term weather cycles. 
(on sustainability) Too narrowly focused and does not
really engage with future needs.
(on sustainability) It is more important to avoid wastage
and recycle properly. 
The CCS is a balance between the overarching aim,
and the resources to progress targets and actions
to reach these aims. In common with most in the
public sector, Moray Council does not have
adequate resources to progress many of the
actions at pace. Therefor external funding is
required to progress these actions which makes it
difficult to plan the speed of actions and their
targets. This is highlighted throughout the
document. 
The requirement for Local Authorities to set out how
they are contributing to tackling climate change and
helping to achieve national and international
obligations is clearly set out in the strategy. 
Mitigation, sustainable development and
adaptation are all covered in the strategy.
None
Target setting
The four proposed principles lack clarity, focus and clear
objectives. 
It could be beneficial to have a clear hierarchy of
vision/objectives/aims. At present, there does not appear
to be an overarching vision to set the direction of the
Strategy. It is then unclear whether the tables set out on p.
23-26 are objectives or actions as they are quite broad.
The principles set out the clear direction of the
strategy to show how the actions of the strategy will
be progressed. These will be reviewed to see if they
can be clarified and linked to the objectives or
actions. 
Setting targets for many of the actions is difficult
without identified funding. As national targets for
1) Improve wording
introducing the principles,
as well as improve wording
of the principles
themselves. Clarify how
these are linked to the
actions.
Page 42

Page 43

Appendix 1
9
We welcome the consideration of indicators to support
monitoring within the table, but these could also be more
specific. It will be important to ensure the baseline data is
available for measuring effectiveness.
Local Authorities have been removed and replaced
with national carbon budgets, the CCS attempts to
mirror this approach. However, this could be
clarified with examples of what change within the
council is required to achieve these budgets - so
the progress of the Council in achieving the aims of
the strategy can be monitored.
2) Greater clarity on the
changes needed to achieve
the carbon budgets.
Behaviour Change
It seems a bit fluffy and only really covers educating
people and 'carrot' interventions. Unfortunately, more
'stick' interventions are required to actually change
behaviour. 
No physically able employee (i.e. anyone without a blue
badge) living within a 3 mile radius should be allowed a
parking permit in Moray Council carpark. 3 miles/ 5
kilometres is around an hour's walk/
a 15 - 20 minute cycle. Lower emissions and improve
employee health and wellbeing at the same time. If High
School students in that radius don't get free bus travel,
then why should adults working for the council get free
parking?
We believe that engagement and long-term
encouragement are key to achieving behaviour
change. 
Council employees do not receive a parking pass.
They pay a rate of £2/ day. 
The Council’s Staff Travel Plan Working Group
supports and promotes sustainable travel to deliver
health, financial and environmental benefits.
None 
Partnership Building Local Engagement Economies of Scale
We have to work with large businesses and employers, to
make use of heat / electricity generation for public use,
and look more beyond the borders of Moray for
partnership working, such as the EasyGo EV charge
contract for the next 20 years. 
(on adaptation) But not filtering down to local action. Why
not engage with local action groups who are already
taking a lead in this.
The CCS focuses on what the council can do within
its own operations and services. The Climate
Change team are engaged in various partnership
projects highlighted in the CCS including heat
networks, working with Moray CAN on developing
an area-wide climate and nature strategy,
progressing Just Transition Fund projects etc. 
None
Page 43

Page 44

Appendix 1
10 
The home resilience kit was a total waste of money and
reflects badly on the grasp the council has of whole
community response. The council are well meaning but
out of their depth in this issue and need to engage with
professional experts as well as engage with communities
who are best placed to propose solutions. Rural
communities in Moray are being left behind.
While some resilience items and leaflets have been
issued to community groups, this is not
widespread. Instead officers engage with
community resilience groups and are available if
they wish guidance on their own community
emergency plans. Officers also engage with
experts, energy companies, and the Government
about resilience. Furthermore, the Council offers a
range of advice through their website at Emergency
Preparations you can do - Moray Council 
Scoring / Prioritisation  
It would be good to know what 'scoring mechanism', i.e.
which criteria and weighting, will be used to assess which
actions take priority of investment, and which not. 
(on carbon budgets) I don't entirely agree. CB4 shows a
large emission reduction for operational costs. The main
aspect within that category is commuting to work. That
can be tackled here and now, with better public transport
connections, car sharing, business travel by means of
bike rather than by (pool) car, and not only in the next 20
years.
The actions state the various sections (building
electricity, fleet, waste, etc) progressing these
actions. Within the services, the responsible
managers will balance opportunities, expected
emission reductions, adaptation opportunities and
investments required. There is no overarching
scoring of actions against each other because they
are funded from different sources. 
CB4 includes assumptions of when the population
will decarbonise their heating and shift to electric
cars. We do not want to assume this will be earlier
as this is an area which the Council can only
influence rather than control. However, the
assumptions behind the budgets will be revisited
for the final version.
1) Greater clarity on the
changes needed to achieve
the carbon budgets and
link to actions.
2) Revisit assumptions
behind the budgets
Interlinkages
Links with Biodiversity Strategy. We (NatureScot)
welcome the strong connections the Climate Change
Strategy has with the Council’s emerging Biodiversity
Agree.  1) Highlight the twin crises
and the alignment with the
Page 44

Page 45

Appendix 1
11 
Strategy. It is particularly positive to see that the Climate
Change Strategy shares nature recovery objectives with
the Biodiversity Strategy (p. 28). This alignment will be
vital to the delivery of both Strategies and the emphasis of
this and the twin crises in Section 3.1 is welcomed. We
recommend highlighting the twin crises and the
alignment with the Biodiversity Strategy in the summary
when this is drafted.  
It would be useful to set out where the Climate Change
Strategy sits within the hierarchy of Council policies and
strategies. 
We would also welcome clarity as to whether the Strategy
update has been through the SEA process — we note that
a Climate Change Strategy was Screened in 2020 
Coastal Change Adaptation Planning We strongly support
the consideration of Coastal Change Adaptation Plans in
the Strategy. This is an important opportunity to ensure
that the Strategy fully acknowledges the Coastal Change
Adaptation Planning, and helps to integrate it with the
local development plan and other workstreams. A key
opportunity is ensuring that spatial planning will protect
areas needed to accommodate future coastal change. 
Nature-based solutions. The recognition given to the
benefits of nature-based solutions is welcomed.
Consideration could also be given to opportunities for
landscape-scale nature restoration, for example, in
relation to the River Spey. 
This can be included in section 4 
The Climate Change Strategy was deemed not to
require an SEA because the documents which
direct this strategy (LDP, Corporate Plan etc) are
already screened. However the intention is to carry
out an Equalities Impact Assessment to identify any
adverse equalities impact. 
This will be covered in the LDP 
This is beyond the scope of the CCS which is an
internal Council strategy. However, officers have
been working with river catchment organisations to
secure funding for landscape scale works. The
issue can be raised in the production of the regional
Biodiversity Strategy in the
summary 
2) Section 4 sets out where
the Climate Change
Strategy sits within the
hierarchy of Council
policies
3) Carry out Equalities Impact
Assessment
Page 45

Page 46

Appendix 1
12 
climate change strategy which is being progressed
with Moray CAN and community representatives.
Disputing CC
There is no "climate crisis". 
A lot of political ideology with no evidence that it will
actually work.
Not achievable because of behaviours elsewhere in the
world. 
Far too costly in staff and operation, most of which
cannot be justified. 
Looking after the quality of the air, water and land is really
the main priority. Climate change is always happening.
Carbon emissions reductions are not necessary because
we need these to sustain foliage plant growth. 
80% of global energy comes from hydrocarbons, and
despite billions being spent on subsidies, this is unlikely
to change in the near future. Renewables in their current
form will only be a minor contribution. As such we should
not be in a hurry to put all our eggs in one basket and keep
the backup of alternative fuel sources for resilience. 
Some costly proposals are un-necessary.
Both the UK & Scottish government, as well as
Moray Council, acknowledge that there is a climate
crisis and that authorities have a responsibility to
act. There is a statutory responsibility on Local
Authorities to develop Strategies and act upon
them. 
Moray Council declared a Climate Emergency in
2019 and a Nature Emergency in 2023. 
The subsidy for hydrocarbons outweighs any
subsidy for renewables. Renewables have
overtaken coal as world's biggest source of
electricity 
The costs involved to mitigate and adapt to climate
change, are far lower than to deal with the ever-
worsening effects of climate change. 
None
Clarity Within Document
(on the four proposed principles & in general) Frustrated
by the tedious jargon. We will never progress like this. To
engage with the public, they must just simplify their brief. 
Climate Change is a complicated topic that we
have  tried to simplify by using common words. We
will look at this again. The document contains a
glossary and much of the jargon is explained within
the text at first use. 
1) Simplify language within
document where possible.
2) Make sure glossary is up to
date.
Page 46

Page 47

Appendix 1
13 
I don't think the budgets are mentioned under Section 7.
They are mentioned on page 14 of Appendix 1. 
Please number pages. [red: in Committee paper] 
The structure of the Strategy is somewhat different from
the Action Plan, which makes it hard to compare and
understand differences and factors of success.
Budgets are contained in section 6.1 setting the
carbon forecasts. This could be reiterated in
section 7. 
The final document will be more accessible with
page numbers etc. 
The structure of the Action Plan (Appendix 2)
roughly follows the same structure as the actions
within the Strategy at Chapter 7 (Delivery) in
Appendix 1. It might differ at places due to the
practical nature of the Action Plan. Most action
points in both documents are similar. 
3) Improve explanation about
budgets in 6.1 and start of
section 7.
4) Insert page numbers. 
Technical Quality of Survey  
There is no option to save this consultation when being
half-way (and not time to complete at this point, for
instance). Or when I click 'back', I've lost all my input. It
would be great if that could be improved.
The option to save surveys is only available if the
users are registered and logged on. In order to
encourage more responses the decision was made
for the survey to be open so unregistered
respondents could complete it. We will review this
in future, especially for longer surveys. 
None 
Page 47

Page 48

Appendix 2 
Moray Council Climate Change
Strategy 2026-2036 
Page 48

Page 49

1 
Moray Council Climate Change Strategy 2026-2036 
Table of Contents
1. Foreword ....................................................................................................... 2
2. Introduction .................................................................................................... 4
3. Background .................................................................................................... 5
3.1. The Climate Emergency .......................................................................... 5
3.2. Moray Council Action to Date .................................................................. 6
4. Updating the Climate Change Strategy ................................................................ 8
5. Principles underpinning the Climate Change Strategy .......................................... 10
6. Climate Change Duties ................................................................................... 12
6.1. Mitigation ............................................................................................. 12
6.2. Adaptation ........................................................................................... 21
6.3. Acting in the most sustainable way ........................................................ 25
7. Delivery of the Strategy ................................................................................... 27
8. Ownership and Governance of the Strategy ....................................................... 35
9. Glossary ...................................................................................................... 38
10. Statutory Obligations ..................................................................................... 40 
Page 49

Page 50

2 
1. Foreword 
Climate change is one of the defining challenges of our time. Its impacts are already tangible
across Moray, from coastal erosion to more frequent extreme weather events. These are leading
to increased pressure on our natural environment, regional infrastructure and Council services.
As a Council, we have long recognised the urgency of this challenge, declaring a climate
emergency in 2019 and a nature emergency in 2023. However, it is crucial that we are realistic
about what we can achieve. Significant progress has been made to date, including a reduction
of our recorded emissions by over 40% since 2017/18, but further action needs to be planned,
funded, and progressed.
This updated Climate Change Strategy for 2026–2036 sets a path for the next decade. It is based
on using the powers of the Council to help create a fair, healthy, resilient and sustainable place
for all who live, work and invest in Moray. 
Our approach is two-fold: mitigation: reducing greenhouse gas emissions by embedding
low-carbon practice in Council operations, strengthening energy efficiency, fleet
decarbonisation and renewable energy; and adaptation: building resilience in our communities,
infrastructure and natural environment so that Moray is better prepared for the climate impacts
already unfolding. 
This Strategy aims to meet national targets, including working towards net zero emissions by
2045, while setting interim five-year carbon budgets to monitor our progress on this pathway.
However, this is not something that Moray Council can do on its own. The funding environment
we find ourselves in and our ability to lever in public and private sector funding will be key to
delivering the actions required to meet national targets. The strategy adopts a path that reflects
the financial reality the Council is in, but these plans are unachievable without appropriate
funding.
Furthermore, Moray’s success depends on partnerships across public services, businesses,
community groups and residents. We encourage all communities and partners to continue
collaborating with us to accelerate climate action and deliver the opportunities that a
low-carbon transition brings for wellbeing, jobs and prosperity.
We are proud of what we have achieved so far and are confident that this Strategy will guide us
toward a fairer, greener future for Moray. Together we can ensure that our beautiful region not
only adapts to a changing climate but thrives in it. 
Cllr Marc Macrae    
Chair of Climate Change Working Group    
Page 50

Page 51

3 
Page 51

Page 52

4 
2. Introduction
The Council has statutory obligations to undertake climate action. To achieve net zero
emissions by 2045 is a collective responsibility across local authorities and the Climate
Change (Scotland) Act 2009 places a duty on all public bodies to act to deliver on the
national carbon budgets. 
Under the current legislation, Moray Council has three statutory duties: 
• Mitigation: to contribute to reducing greenhouse gas emissions 
• Adaptation: to help Council services and communities adapt to the effects of a
changing climate 
• Sustainability: to act in a sustainable manner 
In line with the Scottish Government’s new carbon budgets, which replaced the
previous interim targets, this strategy puts forward a series of four carbon budgets, each
spanning five years. The budgets represent five-year average emissions targets, and are
less prone to fluctuations, due to temporary circumstances, compared to the previous
annual targets.
However, there is more to climate change than cutting carbon. Moray Council faces
rising costs from climate impacts, especially weather-related impacts on infrastructure,
coastal erosion, and wildfires. Adaptation work in this strategy aligns with the Scottish
National Adaptation Plan (SNAP3) objectives and seeks to progress the Council’s
understanding of the challenges ahead.
Climate change and biodiversity loss are interconnected. The degradation of
ecosystems is both a consequence of and a contributor to climate change. As
biodiversity declines, our capacity to adapt to a changing climate is weakened. This
poses risks to key sectors in Moray such as forestry, food and drink, tourism, as well as
public health. By recognising the urgency of the climate emergency and the nature
emergency it is critical that works to tackle climate change are aligned with the Moray
Council Biodiversity Strategy this is why both documents were developed and
presented to the Council together. 
Page 52

Page 53

5 
3. Background
3.1. The Climate Emergency
The climate is changing faster than ever previously experienced. Scientists agree that
greenhouse gas emissions from human activities are the main reason for global
temperature increases over the past 150 years1 (Figure 1). 
Figure 1: Global atmospheric carbon dioxide (CO2) concentration from 803,720 BCE to present day. Data
from National Oceanic and Atmospheric Administration (2023).
Moray’s climate is changing, and the impacts are already being felt as extreme weather
events are increasing in frequency. These changes are projected to continue and
intensify in the future creating pressure on local services including:
• Damage to infrastructure such as buildings, roads, railways and power supplies;
• Damage to ecosystems, water supplies and agricultural production;
• Disrupted food supply chains and increased costs driving up inflation; and
• Disproportionate health and economic effects on vulnerable people. 
Coastal flooding and erosion is a high risk in Moray due to rising sea levels and storm
surges leading to property damage, infrastructure disruption and loss of habitable land.
Storms and wildfires already have a significant impact on Moray’s woodland resources.
Climate change and biodiversity loss are inextricably linked. The rapid loss of nature is
both a result and driver of climate change. Biodiversity loss will negatively impact our
ability to adapt to a changing climate, with implications for the Moray food and drink
sector, tourism sector, and overall health and wellbeing. 
1 IPCC (2021) Climate Change 2021: The Physical Science Basis.
Page 53

Page 54

6 
3.2. Moray Council Action to Date 
Since the production of the Climate Change Strategy (2020-2030) there has been
substantial progress and a greater understanding of the decarbonisation pathway the
Council is on.
• Mitigation: The Council’s emissions decreased by 41.3% since 2017-18 (Figure
1Figure 2). Emissions reduced during the COVID-19 pandemic but increased again
as the Council resumed its usual working practices. The most significant annual
decrease of 30.3% occurred in 2023/24, primarily due to improvements in the
disposal of non-recyclable waste, which was previously sent to landfill but is now
cleanly combusted to generate energy. 
Emissions from transport, building electricity and operational emissions have
slightly decreased. However, building heat – now the largest source of emissions –
has shown little significant change since 2017. 
Figure 2: Reduction in recorded carbon emissions (tCO2e) from Moray Council activities from 2017 to
2024
• Adaptation: The Council’s first report on climate adaptation was produced,
highlighting existing adaptation activity and areas for improvement. There remains
limited understanding of the future costs of climate impacts, but greater awareness
of some of the Council’s vulnerabilities. Moray Coastal Change Adaptation Plans
enable the Council to plan for, and react to, different scenarios as they are
triggered.
• Acting in the most sustainable way: The Council agreed a Sustainable
Development Statement in 2024 to demonstrate how it is progressing sustainable
development as part of its Best Value duties. It included a clear framework for
Page 54

Page 55

7 
monitoring and reporting on sustainable development actions, with measurable
targets to track progress and demonstrate accountability. 
Climate change action is included within the Moray Council Corporate Plan 2024 which
sets out the council’s corporate vision, values and priorities. Within the Corporate Plan
it is recognised that the effects of climate change are a challenge for our communities
and that achieving climate change targets will help support flourishing, healthy
communities. Furthermore, it is highlighted that sustainability, environmental, climate
change and biodiversity considerations are incorporated within existing projects and
specifically considered in committee reports where appropriate.
Progressing climate change action is supported and implemented by a series of
targeted policies, route maps and action plans which lay out the more granular detail
for relevant assets, functions and activities. Therefore, the approach of Moray Council
to climate change issues is set out in this Strategy and a suite of additional documents
including:
• Zero Emission Fleet Replacement Strategy (2024)
• Biodiversity Strategy (2026)
• Local Development Plan and Local Place Plans (in production)
• Local Heat and Energy Efficiency Strategy (2024)
• Coastal Adaptation Plan for Moray (2024)
• Regional Just Transition Plan 
• Moray Climate and Nature Strategy (in development with Scottish Climate
Information Service (SCIS) and Moray CAN)
• Community Wealth Building Strategy (2024)
• Moray Woodland and Forestry Strategy (2024)
• Good Food Nation Strategy (in early stages of production) 
Page 55

Page 56

8 
4. Updating the Climate Change Strategy
The Climate Change Strategy (CCS) is regularly reviewed to ensure that it remains
relevant, aligned with current policies, and is on track to meet its goals. In April 2024,
the Scottish Government replaced interim emissions targets with a system of carbon
budgeting, while reaffirming its long-term target of achieving net zero by 2045. 
The Scottish National Adaptation Plan 2024-2029 (SNAP3) sets out how public services
should include adaptation actions in their activities, and this also needed to be
incorporated within the CCS.  
Although the previous Climate Change Plan and Route Map to Net Zero highlighted the
need for accelerated action and greater resourcing to meet decarbonisation targets,
the current rate of carbon reduction is insufficient for the Council to achieve net zero by
2030. Achieving this within current financial constraints is unlikely, although officers
are working to secure additional external funding.
Therefore, in 2024 the Council agreed that its target of being net zero by 2030 was not
achievable and an update to the CCS should align the Council with Scottish
Government targets to be Net Zero by 2045. It was also decided that the CCS required
updating to reflect progress made and the Council’s evolving understanding of its
climate change duties. In 2025, a member/officer working group was established to
update the CCS and to collect information on appropriate actions, governance
structures, and reporting processes. 
Current Funding Constraints 
The CCS already recognises the need for external funding to accelerate the pace of
change. While external funding opportunities exist, the recent capital budget
reductions (totalling £34.2M over the next 3 years) which were essential for financial
sustainability significantly limit financial flexibility in the short term. As a result, capital-
intensive actions must either be ‘spend-to-save', linked to existing approved
expenditure, or externally funded. As the Council continues to change and its roles
adapt however, there are opportunities during this transformation to embed climate
change considerations within the new structure and activities. 
While the Council has successfully secured external funding for climate change
projects, many available funding sources are challenging to access. Some are limited
by annualised funding cycles, while other funding is offered in the form of loans. The
Council has made efforts to work with partners to secure external funding, and this will
continue. 
With these funding issues in mind, the decarbonisation pathways for properties and
fleet will be calculated by aggregating two separate strands:
1. What we are currently committed to doing with existing funding, what is
achievable with spend-to-save, and what can be done by better use of existing
resources and facilities.
2. What could also be delivered with external funding while recognising practical
constraints on the number of projects which can be delivered and the staffing
resources required to manage these projects.
Page 56

Page 57

9 
Aggregating these two strands will show a timeline of what is achievable (current
pathway) and what could be achievable (aspirational pathway) with sufficient external
funds. This is shown in Figure 7 and is a continuation of the approach we have been
using for our annual Route Map to net zero reports. 
Page 57

Page 58

10 
5. Principles underpinning the Climate Change Strategy
During the update, four principles have emerged which underpin the approach Moray
Council will take to progress Climate Change actions during 2026-36. These principles
attempt to progress climate change action while recognising the limitations created by
current funding constraints. These principles are: 
Efficiency: Our initial focus is on reducing energy consumption, making
efficient use of existing resources, and undertaking readily achievable projects
where return on investment is highest and most cost-effective. If planned
correctly, multiple benefits can be achieved from single interventions,
particularly around natural solutions. 
By focusing on reducing energy consumption and making efficient use of
existing resources, carbon emissions can be lowered when we are facing
financial pressures. Implementing energy-efficient technologies and practices
will reduce the corporate carbon footprint as well as save money. 
Preparedness: We will strategically develop projects to advance the Council’s
priorities, enhancing our ability to respond to collaboration, innovation, and
external funding opportunities of benefit to Moray.
We will develop a pipeline of projects that align with the Council’s priorities
including Climate Change and Just Transition such as renewable energy
projects and sustainable infrastructure development. This will assist in
applying for external funds to progress these priorities when funding is
available 
Balance: Our investments will adopt a practical approach which considers
ongoing revenue costs and the carbon-saving opportunity costs of projects.
This will ensure that public funds are used responsibly for maximum impact.
This includes investing in infrastructure that can withstand extreme weather
events, and the adaptive pathway approach being delivered through the
Coastal Change Adaptation Plans. 
Collaboration: We will engage with residents, the public sector, and industry
to be responsive to new ideas and opportunities, encourage innovation and
ensure that our actions promote a just transition for Moray. Services within the
Council and residents should be partners in delivering climate change
solutions.
We will continue to work with small local suppliers to reduce their carbon
footprint and bid for local contracts. 
Creating a Climate Positive Culture
The Council’s declaration of a climate and nature emergency places urgency on the
pace and scope of its actions. This requires a culture which is supportive of achieving
climate change goals. This includes:
• Strong leadership: Climate action is supported by elected members and the
Council’s corporate leadership team. They lead by example and are visibly involved
in climate action initiatives and routinely engage in updates on the Council’s
progress to net zero. 
• Sufficient resources: Securing external funding is essential to progress the ambition
in the strategy. However, embedding actions within ongoing transformation of
Page 58

Page 59

11 
services is also essential to ensure that the Council reduces costs and its impacts
on the climate and nature. 
• Collective responsibility: Ongoing communications promote the fact that that
everyone at the Council has a responsibility to act sustainably in the interests of the
Council and the environment. 
• Sustainable asset management: Budget Managers have been tasked with
embedding sustainable and climate change aspects within their asset management
plans.
• An empowering change culture: The Council fosters a culture that encourages and
supports innovative ideas for reducing emissions and wider impact on the
environment. 
• Clear and transparent communication: Communications around climate and
nature should be clear and explain why action is being taken, to ensure
understanding and promote behaviour change. 
• Knowledge and expertise: In addition to its climate change officers, the Council
recognises the importance of upskilling to achieve its targets. Training and
development opportunities are created and provided for employees and elected
members on the climate and nature emergency. 
• Robust targets, measurement and evaluation: The Council’s targets are
measurable, and reporting mechanisms are transparent and improve over time.
Where there is uncertainty, assumptions backed by expertise will be made and
stated clearly to avoid understating the Council’s climate and nature impacts. 
Page 59

Page 60

12 
6. Climate Change Duties
The Climate Change (Scotland) Act 2009 places a legal responsibility on a Local
Authority that, in exercising its functions, the Council must act:
• in the way best calculated to contribute to the delivery of emissions reduction
targets (i.e. mitigation) 
• in the way best calculated to help deliver the Adaptation Programme 
• in a way that it considers most sustainable 
6.1. Mitigation 
Scope of Corporate Emissions
As shown in Figure 3, emissions can be categorised in three Scopes: 
Scope 1: emissions originating from sources directly within the Council’s control, e.g.
fuel use in vehicles or buildings (heating), 
Scope 2: emissions originating from sources outside the Council’s direct sphere of
influence, but where they are the direct user of a good or service, e.g. electricity. 
Scope 3: emissions originating from sources where the Council can influence but has
no direct control, e.g. procurement of food for school catering, or staff commuting to
work. 
Figure 3: Emissions scope classification for Moray Council activities
The Council has a statutory duty to report on all Scope 1 and 2 emissions, and all Scope
3 emissions from relevant and significant areas of the organisation’s indirect
Page 60

Page 61

13 
emissions. Calculating scope 3 emissions involves a greater level of uncertainty, both
in the emissions themselves, and the level of responsibility for them. 
While all scope 1 and 2 emissions are included, the scope 3 emissions included are
limited to street lighting, business travel, corporate and municipal waste, water
treatment, staff commuting and homeworking. This is shown in Figure 4. Other large
scope 3 emissions which are not calculated include embodied carbon in purchased
goods and services, and emissions from Council housing. Both these areas would be
difficult to calculate and the work to reduce these are progressing without the need to
calculate emissions savings. These include reducing the climate impact of
procurement and retrofitting Council housing. 
Emissions by area, source, and scope
Building
heat
Natural gas 1
Fuel oil / Kerosene 1
Biomass 1
Purchased heat and steam 2
Building
electricity
Primary schools and nurseries 2
Secondary schools 2
Unmetered electricity 2
Offices 2
Community facilities 2
Residential homes and day centres 2
Sports facilities 2
Industrial 2
Other 2
Fleet
Diesel 1
Petrol 1
Gas oil 1
Electric vehicles 2
Hybrid vehicles 1 & 2
Marine fuel oil 1
Waste
Landfill gas 3
Municipal refuse to landfill / energy from waste plant 3
Commercial, industrial and clinical waste  3
Recycling and composting 3
Operational
activities
Outdoor spaces 3
Commuting emissions 3
Homeworking emissions 3
Water supply and treatment 3
Corporate travel 3
Figure 4: Emissions included in carbon calculations by area, source and scope 
Baselining our emissions
Calculating a baseline of emissions helps to determine the level of intervention needed
to achieve net zero carbon emissions, and to allow progress to be monitored. The
Council’s carbon emissions from 2017/18 are used as a baseline for emissions
because this was the earliest year that had a comprehensive return of emissions to the
Scottish Government.
Page 61

Page 62

14 
Staff commuting emissions and estimates for homeworking have only been recorded
since 2022/23. To ensure consistency with the current scope of reporting, estimated
historical emissions in this category have been added to the baseline using known
assumptions of the workforce size and staff transport modes. This means the 2017/18
baseline is 31,480 tCO2e.   
Current emissions
The latest carbon emission data (2024/25) is shown in Figure 5 
Figure 5: Emissions by source 2024/25 
The areas of building heat and fleet are the largest areas of emissions for Moray Council
and among the most difficult to reduce. Relevant strategies on these areas recognise
current national decarbonisation targets and strive to achieve these whenever possible. 
Setting Emissions Targets
The Council uses a carbon management hierarchy approach to prioritise its targets and
necessary actions (Figure 6). This approach prioritises the avoidance of carbon
emissions to deliver lasting change. Where avoidance of emissions is not possible then
they should be reduced through service efficiencies or redesign. Removal of emissions
is required where further reductions cannot be achieved.
Page 62

Page 63

15 
Figure 6: Moray Council carbon management hierarchy
For example, actions might look like:
• AVOID: Enable home working to avoid commuting.
• REDUCE: Reduce energy use in buildings through smart timing solutions.
• REPLACE: Decarbonisation of our fleet by replacing diesel vehicles with electric
alternatives.
• OFFSET: Plant an area of woodland on Council land to offset unavoidable
emissions.
Offsetting ‘unavoidable’ emissions through offsetting schemes should be considered
as a last resort in target setting. Offsetting significant levels of carbon is discouraged as
large-scale offsets are not sustainable and guidance makes clear that public bodies are
required to reduce emissions as much as possible before considering offsets.
In terms of Local Authority corporate emission reduction targets, the Public Bodies
Climate Change Duties guidance is that Local Authorities should, as best practice,
align to national targets; and could show greater ambition where this is felt to be
achievable. Therefore, an overall net zero target for scopes 1 and 2 should be no later
than 2045, earlier where possible.
The advantages of meeting Net zero targets are more than just about decarbonisation.
The reduction of fossil fuel use and climate changing gasses includes wider linked
objectives of improved air quality, and improved health and wellbeing. However, with a
limited budget to enact change, it is important that actions are proportionate and
balanced to ensure that budget is dispersed around all areas of Council operations. 
Page 63

Page 64

16 
Carbon Projections and Targets
Our current carbon reduction pathway is made up of what we are currently committed
to doing with existing funding, what is achievable with spend to save, and what can be
done by better use of existing resources and facilities. This is shown in Figure 7 and is
located within a range of emissions profiles from a restricted approach where our
emissions only reduce due to external changes (such as electricity grid
decarbonisation), to an aspirational approach which illustrates what could be delivered
with external funding - while recognising practical constraints on the numbers of
projects which can be delivered and the staff resources required to manage these
projects. 
Figure 7: Possible range of net emissions
The current pathway flattens after 2031 because there are fewer projects which the
Council is committed to progress. However, the graph shows that there is the ability to
develop new projects and decarbonise at a greater pace if external funding is secured. 
Interim Carbon Budgets
The Scottish Government has replaced interim targets with 5 year carbon budgets. This
strategy takes a similar approach by putting forward a series of four carbon budgets for
the Council, each spanning five years (Figure 8). The budgets represent five-year
average targets for emissions, which are less prone to fluctuations due to temporary
circumstances such as seasonal variations. The assumptions for our current pathway
are included in carbon budget 1 (2025-30). To reach net zero by 2045 we need to be on
the target pathway which, as Figure 8 shows, means that we need to progress
additional plans at pace to reduce our emissions from building heat and from fleet if
savings are to be realised during CB2 (2030-35).
The necessary reductions to meet carbon budget 3 (2035-40) is greater because of the
expected timeframes for decarbonising transport and heating which anticipate
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
Net Emissions (CO2e)
Possible range in net emissions from present to 2035
Estimated range in emissions between
resticted and aspirational approaches
Current pathway
Page 64

Page 65

17 
accelerated decarbonisation at a later stage when low and zero emissions technologies
become more established and cost effective. 
Figure 8: Proposed carbon budgets and current emissions pathway 
Emissions Reductions in Each Carbon Budget
Different areas of the Council’s operations will progress towards net-zero at differing
rates. Figure 9 and 10 illustrate the expected distribution of carbon savings across the
four carbon budgets. The assumptions and targets making up the budgets are as
follows:
Carbon Budget 1: 2025-2030
Most reductions to date have come from diverting previously landfilled non-recyclable
waste to the NESS Energy from Waste (EfW) facility (Figure 9). Most of the remaining
carbon savings from waste are expected to be realised in the first budget period. While
EfW reduces our emissions from damaging landfill of resources, recycling of waste is
preferable to burning resources. As the landfill sites have now closed, further savings in
emissions from waste must be obtained by means of improved waste reduction and
recycling initiatives. 
Transport emissions are not expected to reduce significantly within the first carbon
budget, but continuing the EV replacement of diesel fleet cars and light vehicles when
they reach the end of their planned working lifespan will help to lower emissions.
However, there is no budget for in the current capital plan so a spend to save case will
have to be made.
0
5000
10000
15000
20000
25000
30000
35000
2017-18
2018-19
2019-20
2020-21
2021-22
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
2032-33
2033-34
2034-35
2035-36
2036-37
2037-38
2038-39
2039-40
2040-41
2041-42
2042-43
2043-44
2044-45
2045-46
Net Emissions (tCO2e)
Carbon Budgets Historical emissions Target pathway Current pathway
CB 4CB 1 CB 2 CB 3
Page 65

Page 66

18 
Plans in place to reduce electricity usage through efficiencies, reducing the corporate
estate, progressing solar projects, and grid decarbonisation will see reductions in
emissions from building electricity. In addition, current plans to replace the heating
system in some school buildings, new energy efficient buildings, and insulation
projects across school estate will see a moderate reduction in emissions from building
heat in the first carbon budget. 
Figure 9: Breakdown of emissions reduction by type in each carbon budget 
Figure 10: Reduction in carbon emissions from each carbon budget
Carbon Budget 2: 2030-2035
Government plans to decarbonise the electricity grid mean that despite increasing
requirements for electricity to power sustainable heating and transport solutions,
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Historical to date CB 1 CB 2 CB 3 CB 4
%
of emissions reductions in given period
Distribution of emissions reductions in each carbon budget
Building Heat Building Electricity Transport Waste Operational Emissions
0
5000
10000
15000
20000
25000
30000
35000
baseline 2025 2030 2035 2040 2045Carbon emissions (tCO2e)
Reduction in carbon emissions by source if carbon
budgets met
Building Heat Building Electricity Transport Waste Operational Emissions
Page 66

Page 67

19 
emissions from our electricity consumption are expected to reach near zero in our
second carbon budget. 
The nature of the Council’s large and diverse property portfolio requires a steady,
consistent approach to decarbonising heating sources. The reductions in carbon for
building heat during carbon budgets 2-4 rely on installing and retrofitting low or zero
emissions heating systems in place of current fossil fuel boilers as these boilers reach
the end of their operating lives. To decarbonise the heating systems of corporate
buildings by 2045 would require around 10 buildings to upgrade their heating systems
each year. 
Decarbonised heat networks as a solution for heating is likely to include public
buildings because they have relatively high heat requirements. If such heat networks
proceed, they will take time to develop, and it is expected that these should start to
come into operation during 2030-2035.
Decarbonisation of fleet vehicles should accelerate during 2030-2035 as low emissions
technologies become more available and cost effective. The change will be gradual as
the heaviest vehicles which use most fuel will be the most difficult to decarbonise. 
Reducing some operating emissions such as commuting and home working are
challenging as these are not in direct control of the Council however, we can influence
these, and these will reduce in line with national practices as individuals change to
electric heating and vehicles. It is assumed that these will slowly reduce during 2030-
2035 with more substantial reductions after 2035.
Carbon Budget 3: 2035-2040
The Council’s operating emissions mostly consist of staff commuting and home
working. Making progress in this area requires changes in the modes and vehicles used
for commuting and on societal shift to electric transport and heating solutions. This is
expected to significantly lag behind areas which the Council has direct control over. For
this reason, reductions in operating emissions are most likely to be realised in later
budgets. Use of EVs and decarbonised heating solutions by staff are expected to
become more commonplace during 2035-40
As the cost of electricity for heating becomes more favourable compared to gas then
the pace of changing building heating from gas to electricity is expected to increase. 
During 2035-2040 the market for low emission heavy vehicles is expected to become
more mature meaning it would be easier to replace these vehicles with low emission
alternatives. 
Carbon Budget 4: 2040-2045
The last carbon budget will see the most difficult to decarbonise buildings, vehicles and
operational emissions reduce. As the market for low emission transport and heating
solutions expand, more staff emissions for commuting and home working will continue
to reduce. It will be more cost effective for hard-to-treat buildings to transition to
Page 67

Page 68

20 
electric heating or heat networks, and diesel vehicles will need to be phased out at the
end of their life with cost efficient alternatives. 
In summary, to stay within the interim carbon budgets and reach net zero by 2045 the
council will have to progress the following activities within each budget: 
CB1 2025-30 CB2 2030-35 CB3 2035-40 CB4 2040-45
Building Heat Continue
progressing
insulation and
fabric first
projects.
Pilot heating and
retrofit projects in
schools delivered.
New replacement
energy efficient
schools 
50 buildings will
have to upgrade
their heating
systems during
this 5 year period.
This will require
an average of 10
buildings to
implement
changes per
annum. 
Heat Networks in
operation
Each year 10
buildings to
upgrade their
heating systems 
Each year 10
buildings to
upgrade their
heating systems 
Building
Electricity
Most productive
solar projects
progressed.
Reduction in size
of corporate
estate
Continuing
efficiencies.
Continuing
decarbonisation
of national grid.
Continuing
decarbonisation
of national grid
Continuing
decarbonisation
of national grid
Fleet Continue roll out
of EV for light
vehicles
Continue roll out
of EV for light
vehicles and start
to move heavy
fleet over to
alternatives.
Market matures
so converting
heavy fleet is
cheaper. 
Remaining hard to
treat vehicles
transitioned at the
end of their
working lives. 
Waste Move from landfill
to EfW
Recycling and
reduction of
waste
Recycling and
reduction of
waste
Recycling and
reduction of
waste
Operational
Activities
Commuting and
homeworking
emissions slowly
reduce in line with
national shifts to
lower emission
heating and
transport.
Commuting and
homeworking
emissions
continue to
reduce through
lower emission
heating and
transport.
Lower emission
heating and
transport is more
common as the
prices reduce and
technology
matures
Lower emission
heating and
transport is more
common as the
prices continues
to reduce and
technology
matures 
Page 68

Page 69

21 
6.2. Adaptation
Climate impacts on the Council 
Moray Council is already seeing rising costs from climate impacts and with the world
heating up faster than scientists predicted, the costs are only set to rise. 
Of immediate concern for the Council are the impacts on infrastructure. Investment in
flood defence has prevented millions of pounds worth of damage over the last ten
years, but climate impacts such as more frequent heavy rainfall after droughts will
increase the risk of events like flash flooding and landslides which can cause damage to
buildings, roads, bridges and other infrastructure which it is responsible for. Rising sea
levels and storms will exacerbate coastal erosion, threatening coastal communities
and infrastructure. Coastal erosion will inevitably lead to a managed retreat in some
cases.
Supporting vulnerable people will become more difficult. Because UK buildings were
not generally designed for extreme temperatures, there will be a greater risk to
vulnerable people during events such as heatwaves or winter storms which cause
power cuts. The elderly, young children, and those with underlying medical conditions
or reduced mobility will be most affected. The increase in milder, wetter winters will
increase the health risks associated with damp and mould, also affecting people who
are already vulnerable the most, especially those in rented accommodation or on low
incomes.
The range of services disrupted by the impacts of extreme weather (heat and storms)
also includes the closure of schools and leisure facilities, halting of housing and road
repairs, and delayed homecare visits. Extreme weather is also placing greater pressure
on communications, enquiry and complaints services as well as the Incident
Management Team who co-ordinate emergency responses.
Procurement is also affected by global system disruptions, for example through rising
costs and low supply of certain goods when other regions experience more intense
climate impacts than we do. Climate driven competition for resources also exacerbates
regional conflicts that can disrupt supply chains and prices. 
The Climate Change Committee report recommends the UK adapt to a minimum global
temperature rise of 2⁰C while considering the risks of warming up to 4⁰C. If global
emissions fail to decrease, the UK could experience temperature rises by 2080-2100
that would severely limit the impact of adaptive measures, increasing the risks to public
health, economic damage, and biodiversity destruction.
National Context 
The current national adaptation programme, SNAP 3, covers 2024-2029 and aims to
meet the following outcomes:
• Nature connects across our land, settlements, coasts and seas
• Communities are creating climate-resilient, healthy and equitable places
• Public services are collaborating in effective and inclusive adaptation action
• Economies and industries are adapting and realising opportunities in our Just
Transition
Page 69

Page 70

22 
• Scotland’s international role supports climate justice and enhanced global
action on climate adaptation
SNAP 3 has a strong focus on cross-cutting policies, reflecting the need to work
together to achieve meaningful change and make use of available resources (Figure 11).
National Planning Framework 4 is a good example of where this is already in practice,
with action to address climate change and nature loss woven throughout the policies.
Other policy links include Just Transition plans, flood resilience, biodiversity strategy,
health and social care, the Learning Estate Investment Programme, and Sustainable
Procurement Duty. 
Figure 11: Scottish Government plans and strategies critical to delivering inclusive and effective
adaptation action during the Adaptation Plan five-year implementation period (SNAP 3 2024-2029)
Many SNAP3 objectives are expected to be delivered by local authorities. At a corporate
level, the below objectives highlight the need for risk assessments and adaptation
action to be delivered: 
Objective PS1: “Providers of public services have the governance, culture, skills and
resources for and are collaborating in effective and inclusive adaptation action.” 
Objective PS2: “People can access the public services they need; and critical assets,
systems and networks are resilient to the impacts of the changing climate.” 
Other objectives falling directly under the Council’s responsibilities include: 
• Nature Networks
• Local Place Plans 
• Coastal Change Adaptation Plans
• Working in collaboration 
• Transport and Road infrastructure resilience 
Page 70

Page 71

23 
Adaptation Work to Date
The 2020 Climate Change Strategy highlighted the need for the Council to be prepared
for climate impacts but did not set out any adaptation actions. This does not mean that
adaptation has not been progressing, but that it has not always reported collectively. 
Since 2023 the Council has been using resources developed by the Scottish
Government’s Adaptation Scotland programme to support public bodies to prepare for
and build resilience to climate impacts. An initial benchmarking exercise was carried
out to gather data on existing adaptation activity across the organisation and to highlight
gaps and opportunities. The benchmarking report found that adaptation is well
advanced in some key service areas. However, on a corporate level the organisation is in
the very early stages of preparing for climate impacts. 
The Council’s most significant contribution to the national adaptation programme is
through the innovative pathway approach now being used to develop new flood and
coastal erosion plans. This will enable the Council to plan for, and react to, different
scenarios as they are triggered. 
Other adaptation action the Council is taking includes the production of the Local
Development Plan 2027 that will incorporate NPF4’s emphasis on the climate and
nature emergencies, support local place planning and deliver Moray’s Nature Network.
The Council is also supporting communities to produce resilience plans. 
The Council is adapting in many other areas that are often absorbed as business-as-
usual changes. However, this can mask the cumulative, or chronic, increase in costs
and staff time. To begin to address this gap, a Local Climate Impacts Profile for the
period 2018 to 2023 has been produced. This is an awareness raising tool, building
evidence on what risks the Council faces from climate impacts by examining previous
extreme weather events. The exercise was limited by available records and staff
capacity but does provide a snapshot of climate impact over recent years to support
decision making going forward. and suggests actions to take the next steps as a climate
ready organisation. 
Vision for a Climate Ready Council
An integrated approach to adaptation will deliver deeper and more sustainable changes
that also support corporate priorities. Collaborative working across services will ensure
that planning around service delivery takes account of possible climate change impacts
and that low cost, shared solutions are taken advantage of. 
A co-ordinated approach to adaptation across policy areas will contribute to improving
social outcomes and reducing costs through addressing issues such as poor health,
inequality, child poverty and educational attainment. Buildings will be adapted to cope
with extreme weather, and strong resilience and emergency planning systems are in
place.
Young people stand to risk the most from climate impacts and will be supported to
develop the skills they will need to adapt and respond to the changing climate as well as
have opportunities and motivation to stay in Moray. 
Page 71

Page 72

24 
Nature-based solutions are recognised to be cost-effective, long lasting and multi
benefit and are expected to be a significant growth area. Securing investment for
nature-based solutions will help our economy, communities and natural environment
be resilient and safe in response to climate change.
Regional collaboration will be developed that will support communities and businesses
to understand climate risk and take collective action to adapt.    
Page 72

Page 73

25 
6.3. Acting in the most sustainable way
Sustainable development is commonly defined as securing a balance of social,
economic, and environmental wellbeing in the impact of activities and decisions and
seeking to meet the needs of the present without compromising the ability of future
generations to meet their own needs.
The Council is committed to embedding sustainability across all areas of its work in line
with its statutory duties and strategic priorities. This commitment is reflected in its
alignment with the National Performance Framework (Figure 12), Best Value
requirements, and the United Nations Sustainable Development Goals (UN SDGs). 
Figure 12: Sustainable development embedded within the National Performance Framework.
In 2024, the Council adopted a Sustainable Development Statement to formalise its
approach and demonstrate how sustainable development is being advanced as part of
its Best Value responsibilities. The statement sets out a framework for monitoring and
reporting on progress, including the use of measurable targets to support transparency
and accountability.
Progress to date includes the integration of sustainable development reporting into key
performance reporting structures, including Quarterly Performance Reports, the
Annual Corporate Plan Report, and the Public Performance Report. This ensures that
sustainability considerations are routinely reflected in the Council’s ongoing
performance evaluation.
The Council is also exploring shared priorities and actions through its participation in
the Local Outcomes Improvement Plan (LOIP) review, progressing this work via a Moray
Economic Partnership (MEP) subgroup. This partnership-based approach supports a
collaborative effort towards achieving local and regional sustainability aspirations.
The Sustainable Development Statement outlines the Council’s goals and objectives,
which are closely aligned with national priorities, the National Performance Framework
outcomes, and the UN SDGs. These objectives are intended to guide the Council’s
Page 73

Page 74

26 
long-term planning and day-to-day operations, ensuring that sustainability is a core
consideration in all areas of service delivery.
To act in the most sustainable way, the Council recognises the importance of
embedding sustainable development principles into all decision-making processes.
This includes resource allocation, procurement, project planning, and service design,
with a strong emphasis on long-term resilience and community wellbeing.
Cross-departmental collaboration is being promoted to further embed these principles
across the organisation. Key tools supporting this include the Council’s procurement
strategy, guidance on assessing the impacts of committee papers, and the Climate
Change Impact Assessment (CCIA) process for projects and mandates, all of which are
either in place or in active development.
The Sustainable Development Statement will be regularly reviewed and updated to
reflect evolving best practices, changes in legislation, and the changing needs of
communities. This process will be aligned with the Council’s annual Climate Change
Plan and Route Map to Net Zero reporting, ensuring continuous improvement and
alignment with evolving wider climate and sustainability goals. 
Page 74

Page 75

27 
7. Delivery of the Strategy
To deliver the Climate Change Strategy requires progress from every area of the
Council. The tables below show what the overall goals of the strategy are. These
contain lists of actions and how the success of the goal will be measured. The actions
were developed while recognising the principles (Section 5) underpinning the strategy,
the carbon budgets (Section 6.1), and the financial constraints the Council is under. 
Building Heat and Electricity
Reducing carbon emissions from building heat and electricity will adopt a fabric first
approach. This means energy-efficient measures like improved insulation and heating
controls upgrades will be carried out to reduce overall heating demand. Then heating
systems will be changed to alternatives such as heat pumps to eliminate emissions
from fossil fuels.
Reduced heat and electricity consumption
We will How to measure success
Increase building user awareness of ways to reduce
energy use and save utility costs
• Year on year reduction in energy usage
within property portfolio
• % of employees working from home Continue to install LEDs and energy saving devices
Promote Smarter Working  
More energy produced by renewables 
We will How to measure success
Investigate feasibility of renewable energy potential
across the Council’s property portfolio, and potential for
connection to a heat network
• Capacity (kW) of energy generation
installed
Install renewable energy technologies on Council-owned
buildings and land  
Reduced building carbon output and increased energy efficiency
We will How to measure success
Progress a ‘fabric first’ approach to building retrofit  • Reduction in carbon emissions from
corporate and learning estate
• % of buildings that have a non-carbon
burning heat source
• % of Council houses achieving EPC C
or are as energy efficient as practically
possible
Identify opportunities for 'Heating and Power'
refurbishment of school estate to be implemented in the
next 10 years.
Replacement of carbon-based heating systems when
feasible
Achieve Energy Efficiency Standard for Social Housing
(EESSH) for all Council housing 
Page 75

Page 76

28 
Fleet and Travel
The Council approved a Zero Emissions Fleet Replacement Strategy in April 2024,
outlining its approach to meeting government targets by replacing fossil fuel-powered
vehicles with low-emission alternatives. The primary objective is to implement a
practical fleet replacement program within the available budget, ensuring that the
Council meets government targets to the greatest extent possible. However, budget
constraints makes this difficult to progress at present unless a spend to save case can
be made. Simultaneously, efforts will be made to develop opportunities for the use of
HVO and hydrogen within the fleet to facilitate a smooth transition to these alternatives
if they are commercially viable. The Zero Emission Fleet Replacement Strategy is
currently under review.
Other objectives relating to transport include reducing council emissions from
commuting and supporting wider emissions reductions from public and schools.
Decarbonising Council fleet
We will How to measure success
Displace fossil fuel powered vehicles and plant with
ULEV alternatives (as budgets allow)
• % of low energy vehicles in fleet
• Reduction in fossil fuel consumption 
Trial HVO fuel in diesel fleet vehicles
Monitor progress on hydrogen suitability for fleet vehicles
Develop Ashgrove depot as a green hub  
Actions and opportunities to reduce commuting emissions
We will How to measure success
Promote active travel for Moray Council employees • Council Travel Plan survey
• Take up of ULEV salary sacrifice
scheme
Monitor uptake of ultra-low emission vehicle (ULEV)
salary sacrifice scheme for employees  
Facilitating emissions reduction from travel
We will How to measure success
Complete delivery of North of Scotland Electric Vehicle
Infrastructure Fund to provide more public EV charging
facilities in Moray
• Number and type of public EV chargers
in Moray
• % of pupils using active travel
• Number of schools with travel plans Organise bicycle maintenance sessions and led rides for
staff
Parking management around schools and supporting
modal shift from vehicles to active travel 
Waste
Moray’s municipal waste is treated at the NESS Energy from Waste facility in Aberdeen,
an energy from waste facility capable of processing 150,000 tonnes of municipal solid
waste every year, generating electricity which is sent to the national grid.
Reduction in residual waste
We will How to measure success
Work with Zero Waste Scotland and third sector partners
to progress projects to reduce waste through re-use and
recycling
• Increased recycling rates
• Increased reuse rate
• Reduction in overall waste volume  
Page 76

Page 77

29 
Operational Activities
Due to the overarching nature of climate change and how it impacts on all aspects of
the council’s operation, co-operation and input has been sought across all services to
discuss and agree key actions.
Reduced emissions from operational actions
We will How to measure success
Support homeworkers to reduce their emissions through
relevant advice and practical assistance
• Sources of advice and guidance made
available and up to date  
Increased awareness of actions and opportunities to tackle climate change
We will How to measure success
Develop and deliver climate and nature emergency
training for staff and elected members
• Training delivered to key target groups
• How Good is our School (HGIOS)
positive scores of very good/excellent-
for Learning for Sustainability and
outdoor learning measures 
Update climate change awareness training as part of the
employee induction process
Increase opportunities for learning about climate change
and nature within the curriculum. Improve the quality of
outdoor learning and play spaces.
Support the development of knowledge and skills across
departments – newsletters and informal engagement etc  
Integrate climate considerations in decision making 
We will How to measure success
Applying low carbon objectives as a factor in all
investment decisions in relation to budgets and the
Capital Plan
• Climate change actions included in
relevant service plans
• Routemap to Net Zero document is
updated annually
• Climate Change Strategy is updated
every 5 years
• Use of Climate Change guidance in the
mandate decision making process
Embed main CC Actions within relevant service plans
and similar to ensure they are developed and progressed
by service area
Ensuring the Climate Change Strategy and Action Plan
are living documents and remain fresh and valid until
2035
Review climate change and biodiversity assessment of
committee papers.
Continue to develop climate change guidance for the
mandate decision process
Contribute to the work of Scottish Climate Intelligence
Service (SCIS) and ClimateView
Incorporate climate risks into the corporate risk register 
Page 77

Page 78

30 
Procurement and Investment
In accordance with the sustainable procurement duty, the Council’s Procurement
Strategy sets out how the Council will use procurement to contribute to the global
climate emergency. Additionally, the Council is required to report progress in its annual
procurement report and how procurement policies and activity has contributed to
compliance with climate change duties.
The Scottish Government sustainable procurement tools are available to officers, and
can support buyers to embed climate objectives into procurement activities through
identifying and addressing opportunities to optimise the economic, social and
environmental outcomes of procurement activities. 
Maximise opportunities for climate action through procurement
We will How to measure success
Continue to deliver and record non-cash benefits such
as sustainability, climate change and community wealth
building through the procurement process. 
• Actions in Council’s procurement
strategy
• Information from Council’s annual
procurement report 
Deliver sustainable procurement guidance to officers 
Sustainable Development
Sustainable development is an approach to development that balances different needs
against an awareness of the environmental, social and economic limitations we face as
a society.
Embed sustainable development into daily service delivery
We will How to measure success
Ensure sustainable development is included within
Council decision making
• Community involvement in CCS and
Area Wide Climate Change Strategy
• Performance indicators reported with
Corporate Plans
Identify any further sustainable development gaps 
Consider and embed community views on sustainable
development 
Page 78

Page 79

31 
Nature, Biodiversity and Carbon Sequestration
The Council’s first Biodiversity Strategy brings together the many areas of nature which
Moray Council impacts on, influences, or benefits from and sets out the key issues to
be addressed as the Council delivers its statutory Biodiversity Duty. Expectations for
local authorities have been set out in the Scottish Biodiversity Delivery Plan published
in 2024.
Maximise opportunities to sequester carbon within existing Council assets
We will How to measure success
Progress and monitor carbon sequestration
opportunities on Council land holdings
• Indicative carbon offsetting plan
developed  
Promote nature recovery on Council land
We will How to measure success
Produce and deliver nature positive management plans
for Council greenspace 
• Actions delivered within management
plans (incl existing)
• Number of management plans in place
to improve biodiversity, and sites in
good ecological condition.
• Training delivered to operators 
Maintain the biodiversity benefits of living lawns and
wildflower program, and seek to expand it 
Increase urban canopy cover and other nature-based
solutions to climate risk, providing multiple benefits to
communities and developing nature networks.  
Nature recovery through policy and partnerships
We will How to measure success
Ensure that planning policy, guidance and decisions
deliver positive effects for biodiversity
• Local planning policy in place
• Spatially defined Nature Network in
place Identify and deliver a Moray Nature Network  
Work with communities and partners to progress biodiversity actions at the local level
We will How to measure success
Facilitate the development of skills and knowledge to
protect and restore biodiversity in Moray
• North East Scotland Biodiversity
Partnership (NESBiP) action plan
delivery  Help facilitate community connections with nature 
Page 79

Page 80

32 
Adaptation
Adaptation is about responding to the changes that we have seen in Scotland’s climate
over the last few decades and preparing for the challenges and opportunities that we
will face as our climate changes.
Increase understanding of climate risk 
We will How to measure success
Create and maintain a climate impacts log • Include summary of log in annual
report
• Number of towns with mapping
complete
• Training delivered (No. of
sessions/staff)
• CCRA completed
Produce climate risk and nature-based solution maps for
larger towns
Embed adaptation within climate training and
mainstreaming 
Move towards the production of a Climate Change Risk
Assessment (CCRA)  
Align adaptation activities with Council’s priorities
We will How to measure success
Align adaptation activities with Council’s priorities. • Number of Council priorities and
service plans referring to adaptation
and climate risk  
Deliver and monitor adaptation action 
We will How to measure success
Undertake annual benchmarking exercise  • Incorporate adaptation guidance into
climate change guidance for
developers 
• Measure proxies for adaptation works
as per SNAP3 eg nature network, No. of
local place plans, roads maintenance 
etc
• Flood Risk Management Plan and
Coastal Change Adaptation actions
delivered (3 yearly)
• Adaptation activity included in annual
routemap report 
Implement flooding and coastal risk action plans 
Incorporate adaptation into the LDP 
Implement a Moray Nature Network 
Embed adaptation in the delivery of other council
activities, where appropriate  
Work collaboratively with partners to progress adaptation action
We will How to measure success
Encourage communities to consider climate risk and
adaptation
• Number of resilience plans in place 
Page 80

Page 81

33 
External Influence
Through our varied functions and influence, Moray Council can have a wide and
significant influence on emissions and climate action far beyond our organisational
boundaries. This section identifies these functions and influences.
Develop skills and the economy
We will How to measure success
Increasing provision of relevant skills and knowledge for
a greener economy to support delivery of the Moray
Apprenticeship Strategy
• Number of engagements with
businesses
Support the planning and delivery of awareness raising
events for businesses to transition to a green economy
Joining support networks to assist the progress of climate
change action  
Enabling the community to understand and act on climate change 
We will How to measure success
Consulting community groups and residents about
climate action and delivering the Climate Change
Strategy
• Continued and regular meetings with
Moray CAN, with actions arising followed
up promptly
• Moray-wide climate strategy created
• Number of engagement activities
undertaken to promote active travel
• Number of houses benefitting from
scheme / funding achieved
Support the work of Moray CAN
Engaging with communities to facilitate renewable
energy projects
Support the development of a Moray-wide climate
strategy
Support the reporting of area wide emissions and actions
Promoting the Active Travel Strategy
Continuing the Energy Efficiency Scotland: Area Based
Scheme (EES: ABS) 
Local Heat and Energy Efficiency Strategies (LHEES) are local authority area-wide plans and
priorities for systematically improving the energy efficiency of buildings and decarbonising
heat.
Delivering the LHEES Delivery Plan
We will How to measure success
Improving the energy efficiency of buildings while
supporting a wellbeing economy, and a Just Transition 
• LHEES Updates with appropriate PIs
Decarbonising building heat sources including
supporting heat networks while tackling fuel poverty and
improving health 
Moray Council and HIE developed a Hydrogen Strategy and Action Plan which explores the
use of green hydrogen. Moray Council recognises that hydrogen could have a role in providing
an alternative to fossil fuels.
Delivering the Moray Hydrogen Strategy
We will How to measure success
Continue to develop relationships with key partners and
adjacent Councils.
• Number of hydrogen opportunities
progressed in Moray 
• Hydrogen pilot progressed Develop a hydrogen fleet pilot when availability of
hydrogen and suitable vehicles make this practical. 
Page 81

Page 82

34 
The planning system in Scotland is designed to manage land use and development, ensuring
sustainable growth while balancing community needs and environmental protection.
National Planning Framework 4 (NPF4) is a long-term strategic plan for Scotland which
outlines the national strategy for land use and development over the next 20 years.
Strategic planning which reflects the climate and nature emergency
We will How to measure success
Implementing NPF4 policies relating to the climate and
nature crises
• Strategies in place and delivering change
Developing a Regional Spatial Strategy
Embedding climate change into new place based, people
centred, delivery focussed LDP.
Developing 20-minute neighbourhood concepts for
Moray’s main towns and embedding within the next Local
Development Plan
Promoting and supporting brownfield over greenfield
development
Deliver Moray Growth Deal Housing Mix Delivery project
Update climate change guidance for planning
applications in line with national guidance 
Just Transition
Moray faces significant economic, environmental and demographic challenges, but
also extraordinary opportunities. Offshore renewables, nature restoration, community
energy, low-carbon housing, and green enterprise investment draw on the region’s
strengths and can secure long term benefits for local people.
Develop skills and the economy
We will How to measure success
Prepare to submit the bid to the Just Transition Fund. • Funding bid developed and submitted
Continue to engage with elected members, Moray MP’s
and MSP’s and JCC. 
Page 82

Page 83

35 
8. Ownership and Governance of the Strategy
The public sector has a critical role in helping Scotland to reduce greenhouse gas
emissions, make a just transition to a low carbon economy and prepare for the future
climate. Strong governance, leadership and commitment within the public sector is
vital to ensure that Scotland meets its targets and commitments. 
Roles and Responsibilities
Setting out clear responsibilities will help to integrate climate change considerations
into day-to-day Council business.
• Political leadership and accountability for the Council’s climate agenda shall rest
with the Chair of the relevant Committee, in accordance with the Council decision of
December 2024. The Chair of the Economic Development and Infrastructure
Committee is responsible for providing strategic direction, overseeing the
development and implementation of climate-related policies and strategies,
ensuring climate considerations are integrated into Council decision-making,
monitoring progress against agreed objectives and commitments, and leading the
Committee's scrutiny and prioritisation of resources required to deliver the Council's
climate ambitions.
The Climate Champion is a distinct elected member role appointed in accordance
with the Council Champion arrangements. The role is to act as an advocate for
climate action and sustainability, promote awareness and understanding of the
Council's climate ambitions, encourage the sharing of good practice across the
Council and its communities, support engagement with residents, partners and
stakeholders, maintain constructive links with relevant officers, committees and
external organisations, and help communicate the Council's climate objectives and
achievements.
The Chair of the Economic Development and Infrastructure Committee and the
Climate Champion shall work collaboratively to support the achievement of the
Council's climate objectives, recognising that responsibility for strategic leadership,
policy oversight, and accountability rests with the Committee Chair, while the
Climate Champion's role is focused on advocacy, engagement, and awareness-
raising.
• The Executive Director Economy, Enterprise & Operations will provide officer
leadership at Corporate Leadership Team level and have responsibility to promote
the CCS at Corporate and Community Planning level. 
• The Head of Growth, Planning & Climate will be the lead officer for co-ordination
and management of the Strategy internally within the Council.
• Due to the wide scope of climate change and climate change related activities,
Heads of Service will have responsibility and accountability for climate change
actions and targets within their service area. The delivery of CCS actions may be
delegated to third tier managers to ensure that day to day management
responsibilities are clear and that delegated decision making is undertaken at the
appropriate level.
Page 83

Page 84

36 
• Climate Change Officers will support progress in the implementation and
monitoring of the Climate Change Strategy and associated works, provide
leadership, specialist input, and reporting on statutory duties.
• All members, managers and staff will share responsibility for implementing the
strategy through relevant actions within the Action Plan and ensuring that Council
policies, decisions, projects and procurement are delivered in line with the priorities
in the Strategy. 
Mainstreaming Climate in Decision Making
This aims to integrate climate change within decision-making and financial planning so
the Council will develop a process whereby the ‘climate change question’ and
‘sustainability question’ is routinely asked as part of the decision-making process.
We will embed main CC Actions within relevant service plans and similar to ensure
they are developed and progressed by service area (target of June 2026). This will give
greater focus on CC actions with clearer reporting and will help to ensure CC actions
evolve and continue to be relevant. 
The Climate Change Board has the role of overseeing the progress of actions from the
CCS, mainstreaming Climate Change and being a sounding board on climate change
issues. Issues where a sounding board is required will be run past Strategic Leadership
Forum and the chair will consider extending the members invited for those items as has
been the case in the past. The Board will also receive presentations on climate change
aspects and be a “critical friend” discussing proposals and considering climate change
impacts of projects early in their development. Membership of the Board to include
Heads of Service and officers as appropriate.
Mainstreaming Climate Change Training with the aim to increase staff knowledge and
understanding of the climate and biodiversity crises and the Council’s role and
response. Training capacity has been reduced but it was raised that training is
fundamental to mainstreaming climate change issues across the Council. In addition to
continuing to develop the online module created as part of staff inductions, there may
be capacity to deliver bespoke training based on service needs (maximum 2 a year with
current resources) and refresh resources available on the website and Interchange. The
need for climate change training for Heads of Service and Executive Directors has been
identified. If resources allow, the climate change team intend to develop a training
session for Heads of Service and Executive Directors with support and input from Moray
based organisations and other LAs. There will also be informal engagement
opportunities created such as lunch and learns, e-newsletters and lunchtime catch
ups. 
Climate Considerations in Decision Making
It is essential, if public bodies are to be compliant with their obligations under the 2009
Act, that the climate change duties are a part of decision making; and that the thought
process behind the decision can be clearly demonstrated and explained.
Page 84

Page 85

37 
Project and Mandate Climate Change Impact Assessment (CCIA)- update guidance
which sets out how climate impacts should be considered within projects mandate /
OBC / FBC stages. Methodology to include process of including carbon as part of the
Growth Deal process.
Climate Change and Biodiversity Assessment for Committee Papers – evaluate the
climate change impacts section of committee papers and assess whether current
guidance is drawing out required information in reports effectively. If required develop
training for officers completing this section in committee reports. If the Integrated
Impacts Assessment (IIA) process is reviewed, then climate change and sustainability
could be included in any wider system. 
Monitoring and Reporting
Outcome measures have been identified for all actions which are proposed to be the
primary method for monitoring progress on climate change objectives and targets.
These actions and indicators will be reviewed by the Climate Change Board to monitor
progress on actions for the lifespan of the strategy. 
An annual Route Map to Net Zero report will continue to be presented to Council. This
will set out our latest annual emissions, report on progress of the CCS actions, and
evaluate our progress to our 2045 and interim targets.
Statutory reporting under the Climate Change (Scotland) Act 2009 on Public Bodies
Climate Change Duties also requires annual progress reports be submitted to Scottish
Government in November of each year. 
Quality Assurance and Audit
To ensure the Strategy remains relevant and accounts for ongoing national policy
development, it will be subject to review at 5-year intervals. Any updates will be
approved by Council. 
The annual Route Map to Net Zero will evaluate the progress to interim targets and
highlight issues if the targets are not likely to be met. 
Page 85

Page 86

38 
9. Glossary 
Active travel Journeys made by modes of transport that are fully or partially
people-powered, irrespective of the purpose of the journey. It
includes walking, people using wheelchairs, cycling (including e-
bikes) to name a few.
Adaptation Adjustments in natural or human systems in response to actual or
expected climatic stimuli or their effects, which moderates harm or
exploits beneficial opportunities.
Baseline Historical period specified for the purpose of comparing greenhouse
gas emissions.
Biodiversity The variability among living organisms from all sources, including,
inter alia, terrestrial, marine and other aquatic ecosystems and the
ecological complexes of which they are part; this includes diversity
within species, between species and of ecosystems (UN 1992).
Carbon Umbrella term used to describe all of the greenhouse gases.
Carbon dioxide
(CO2)
A naturally occurring gas, CO2 is also a by-product of burning fossil
fuels (such as oil, gas and coal), of burning biomass, of land-use
changes and of industrial processes (e.g., cement production). It is
the principal anthropogenic greenhouse gas that affects the Earth’s
radiative balance.
Carbon neutrality See net zero.
Carbon
sequestration
A process by which carbon dioxide is removed from the atmosphere
and held in solid or liquid form.
Circular economy A circular economy is one in which resources are kept in use for as
long as possible.
Climate action Efforts taken to mitigate and adapt to the impacts of climate change.
Climate change The state of the climate that can be identified (e.g., by using
statistical tests) by changes in the mean and/or the variability of its
properties and that persists for an extended period, typically
decades or longer.
Climate emergency A situation in which urgent action is required to reduce or halt
climate change and avoid potentially irreversible environmental
damage resulting from it.
Co-benefits The positive effects that a policy or measure aimed at one objective
might have on other objectives, thereby increasing the total benefits
for society or the environment. Co-benefits are often subject to
uncertainty and depend on local circumstances and implementation
practices, among other factors. Co-benefits are also referred to as
ancillary benefits.
Direct emissions Emissions directly under the organisation's control.
Drought A prolonged period of abnormally low rainfall, leading to a shortage
of water.
Flood The overflowing of the normal confines of a stream or other body of
water, or the accumulation of water over areas that are not normally
submerged. Floods include river (fluvial) floods, flash floods, urban
floods, pluvial floods, sewer floods and coastal floods.
Green jobs Employment opportunities that contribute to environmental
sustainability.
Page 86

Page 87

39 
Green recovery The transition to a more sustainable and resilient economy following
a crisis, such as the Covid-19 pandemic, that prioritises investment
in low carbon technologies, sustainable infrastructure and job
creation in environmentally friendly sectors.
Greenhouse gas
emissions
Any gas that contributes to the greenhouse effect by absorbing
infrared radiation in the atmosphere.
heatwave A heatwave is an extended period of hot weather relative to the
expected conditions of the area at that time of year. In Moray, a
heatwave event is defined as at least three consecutive days with
daily maximum temperatures meeting or exceeding 25°C.
Indirect emissions Emissions outside the organisation's control but over which it has an
influence.
Insetting The process of offsetting carbon emissions by sequestering carbon
within the organisation's own landholdings.
IPCC Intergovernmental Panel on Climate Change. A scientific body
established by the United Nations to provide policymakers with
regular assessments of the state of climate science and the potential
impacts of climate change, as well as strategies for mitigation and
adaptation. 
Just transition  Designing policies in a way that ensures the benefits of climate
action are shared widely, while the costs do not unfairly burden
those least able to pay, or whose livelihoods are directly or indirectly
at risk as the economy shifts and changes.
Mitigation A human intervention to reduce emissions or enhance the sinks of
greenhouse gases.
Nature emergency The rapidly worsening state of the natural world, including the loss of
biodiversity, ecosystem degradation, and the threat of ecological
collapse, caused by human activities such as habitat destruction,
pollution and climate change.
Nature network A network which connects together nature-rich sites, including
restoration areas and other environmental projects, through a series
of areas of suitable habitat, habitat corridors, and stepping-stones.
Net zero Net zero emissions are achieved when anthropogenic emissions of
greenhouse gases to the atmosphere are balanced by anthropogenic
removals over a specified period.
Offsetting The practice of compensating for carbon emissions by funding
projects that reduce greenhouse gas emissions outside of the
organisation's own landholdings.
Renewable energy Energy derived from natural sources that are replenished at a higher
rate than they are consumed.
Sustainable
development
Meeting the needs of the present without compromising the ability of
future generations to meet their own needs.
tCO2e Tonnes of carbon dioxide equivalent. A metric measure used to
compare the emissions from various greenhouse gases on the basis
of their global-warming potential (GWP), by converting amounts of
other gases to the equivalent amount of carbon dioxide with the
same global warming potential.
Wildfire Any uncontrolled vegetation fire which requires a decision, or action,
regarding suppression. 
Page 87

Page 88

40 
10. Statutory Obligations
Moray Council has a statutory obligation to undertake climate action and support the
Scotland wide goal of achieving net zero by 2045. Key national policies and strategies
include:
• Climate Change (Scotland) Act 2009 places a duty on all public bodies to act to
deliver on the national climate change targets. Under this legislation, Moray Council
has three main duties:
o Mitigation: To contribute to reducing greenhouse gas emissions
o Adaptation: To help Moray adapt to the changing climate
o Sustainability: To act in a sustainable manner
• Climate Change (Duties of Public Bodies: Reporting Requirements) (Scotland)
Order 2015 requires the Council to report on compliance with these duties annually
in accordance with the and subsequent amendments.
• National Planning Framework 4 (NPF4) 2023 considers carbon, climate change
and biodiversity by incorporating the national climate change targets into the local
planning system to promote sustainable development.
• The Heat Networks (Scotland) Act 2021 aims to regulate and support the
development of heat networks. Heat networks distribute heat from a central source
to multiple buildings, reducing the need for individual heating systems and
promoting energy efficiency. The Council is required to undertake assessments of
the potential for heat networks in Moray and develop plans to promote their use.
• The Local Heat and Energy Efficiency Strategies (Scotland) Order 2022 requires
the Council to develop plans to improve energy efficiency and reduce carbon
emissions in buildings across Moray, to support the transition to net zero.
• The Nature Conservation (Scotland) Act 2004 aims to protect and conserve
biodiversity and natural habitats. It places a duty on the Council to consider
biodiversity in its decision-making processes and to promote the conservation of
local habitats and species. 
• The Transport (Scotland) Act 2019 aims to promote sustainable transport and
reduce greenhouse gas emissions from the transport sector. It has provided
councils with greater powers to implement Low Emission Zones and improve active
travel infrastructure.
• Scottish National Adaptation Plan 3 (SNAP 3) 2024-29 sets out how Scotland will
adapt to the risks identified in the UK Climate Change Risk Assessment. The plan
includes actions that fall under the Council’s responsibility, and those it has a
supportive role in addressing. 
• Scottish Biodiversity Strategy and Delivery Plan 2024 commits to halting
biodiversity loss by 2030 and to restoring and regenerating nature by 2045. The plan
includes stronger guidance as to how the Council is expected to meet its
Biodiversity Duty. 
• The Civil Contingencies Act (2004) requires the Council to assess the risk of
emergencies occurring and maintain plans to ensure that services continue to be
delivered in the event of an emergency. Severe weather and climate change are
linked to emergencies that may result in wide impacts ranging from serious
environmental damage to loss of life. 
Page 88

Page 89

41 
• The Flood Risk Management (Scotland) Act 2009 requires the Council to
implement and maintain flood protection actions and prepare local flood risk
management plans. The Council is the lead authority for the Findhorn, Nairn and
Speyside Local Plan District and works with partners to deliver the plan.
In addition, climate change is increasingly being embedded in in all government
policies ranging from infrastructure delivery to energy policy, and these are likely to
influence the Council’s work moving forward.  
Page 89

Page 90

42 
Page 90

Page 91

Appendix 3
1
Action no.  Officer
Responsible
Action SMART Measure/Objectives How is this resourced?
1. Buildings 
1.1  Service Manager
Property, Estates
& Assets / Energy
Officer
Progress a “fabric first” approach to allow
buildings to reduce carbon emissions to net
zero. 
Replacement of carbon-based heating systems
when feasible. 
Aim to achieve zero carbon standards in all new
buildings, including housing and schools.
Year on year reduction in energy
usage within property portfolio.
Initial projects to reduce consumption will be undertaken
within existing staff resource. Finance will be from existing
budgets or spend to save proposals. 
Reduction in carbon emissions from
corporate and learning estate. 
% of corporate buildings which have
a non-carbon burning heat source. 
1.2 Energy Officer Investigate feasibility of renewable energy
potential across the Council’s property
portfolio, and potential for connection to a
heat network. 
Install renewable energy technologies on
Council-owned buildings and land.
Capacity (kW) of energy generation
installed.
Staff time. 
Spend to save.
1.3 Service Manager
Education Estate
Complete Learning Estate Asset Management
plan to identify opportunities for 'Heating and
Power' refurbishment to be implemented next
10 years. 
Aim to achieve zero carbon standards in
schools.
Opportunities identified for
refurbishment. 
% of BB upgrade capital budget (indicative) and opportunity
grant funding. 
% of schools which have a non-
carbon burning heat source.
Page 91

Page 92

Appendix 3
2
1.4 Service Manager
Property, Estates
& Assets /
Housing Asset
Manager
Achieve Energy Efficiency Standard for Social
Housing (EESSH) for all council houses.
% of council houses achieving EPC C
or are as energy efficient as
practically possible.
Finances to achieve this target will come from the Housing
Investment Plan which currently has available budget. 
Challenges with available staff and contractor support to
deliver a targeted accelerated programme to meet current
Housing regulator standard of EPC band C for energy
efficiency. Current review of future standards underway by
Scottish Government and will update this measure as new
targets are known.
% of council houses that have a non-
carbon burning heat source.
1.5 Energy Officer /
Service Manager
Property, Estates
& Assets
Engage with building users to increase
knowledge of energy and utility reduction
methods. 
Continue to install LEDs and energy saving
devices.
Number of energy and utility
engagement sessions and
campaigns. 
Year on year reduction in energy and
utility usage within property
portfolio. 
Internal staff time and energy awareness work. 
Spend to save.
2. Fleet & Travel
2.1 Service Manager
Roads & Fleet
Displace fossil fuel powered vehicles and plant
with ULEV alternatives (as budgets allow). 
Trial HVO fuel in diesel fleet vehicles. 
Monitor progress on hydrogen suitability for
fleet vehicles. 
Develop Ashgrove depot as a green hub. 
% of low energy vehicles on fleet. 
Reduction in fossil fuel consumption.
The Zero Emission Fleet Replacement Strategy indicates a
30% reduction in fossil fuel consumption by 2030. 
The target for zero emission vehicles is approximately 150
vehicles by 2030. 
No specific or additional resources have been allocated to
these targets. 
The Zero Emission Fleet Replacement Strategy is currently
under review. 
Page 92

Page 93

Appendix 3
3
2.2  Sustainable
Travel
Develop and promote Travel Plans for Moray
Council and major employers. 
Promote active travel for Moray Council
employees.
Increased % of people using active
travel, car share and public
transport. 
Actions are being progressed on the Moray Council Travel
Plan using officer time for activities such as led rides and
confidence sessions, and grant funding when required for
physical changes e.g. cycle storage.
Number of major employers with
travel plans implemented. 
No funding available at present. 
2.3 Sustainable Travel Develop and implement an Active Travel to
School campaign. Improve parking
management around schools and introduce
measures to support modal shift from vehicles
to active travel.
% of pupils using active travel.  This is resourced using Travel Tracker data though Living
Streets. Along with Hands Up Scotland Survey and Outfit
Morays Bikeability data. 
Number of schools with travel plans
implemented.
Officer time, school staff time, and walking charity Living
Streets, through behaviour change grant funding. Living
Streets work with schools to increase active travel journeys
to school through support and development of Travel Plans,
Travel Tracker, Active Travel Zone leaflets, and School
Route audits.
Increased number of measures in
place to support modal shift.
Officer and external providers time, as well as school staff
and grant funding.
2.4 Transportation Complete delivery of North of Scotland Electric
Vehicle Infrastructure Fund expansion plan to
provide more public EV charging facilities in
Moray 
Number and type of public EV
chargers in Moray. 
Resourced through North of Scotland Consortium annual
contract payment. 
2.5 Moray Growth
Deal Project
Bus Revolution project to reduce the
environmental impact of transport in the area.
Reduce the emissions by 30t CO2e
p.a. by 2030 (related to both direct
and indirect emissions).
Moray Growth Deal.
Zero Emission vehicle (electric) procurement through the
life cycle of the project.
Funded through project capital budget.
Integration of electric vehicles into public transport and
other passenger transport operations delivered by the
Public Transport Unit (PTU).
Page 93

Page 94

Appendix 3
4
Officer time for specification, market research and
procurement of selected vehicles. 
Officer time for monitoring, analysing and reporting of
Direct & Indirect emissions
3. Waste/Circular Economy
3.1 Waste Manager Work with Zero Waste Scotland and third
sector partners to progress projects to reduce
waste through re-use and recycling. 
Promote recycling and waste reduction through
waste education.
Increased recycling rates. 
Increased reuse rate. 
Reduction in overall waste volume.
Waste budget/external funding opportunities.
4. Operating Activities
4.1 Project Officer /
Head of Housing,
Property &
Communities
Implement smarter working approaches,
including increased remote and hybrid working,
to reduce the organisation’s physical footprint
and business travel, contributing to lower
energy consumption and carbon emissions. 
Increase workspace utilisation in HQ,
the Annexe, and Rose Cottage to
over 80%.
Reduce business travel and staff
commuting emissions by promoting
remote and hybrid working
arrangements. 
Since October 2025, delivery has been supported through a
60:40 resource split:
• 60% Smarter Working Programme
• 40% Depot & Stores Rationalisation Project
This balance is expected to shift going forward, with
resource becoming predominantly focused on the Depot
and Stores Rationalisation project, reducing capacity
available for wider Smarter Working activity. 
4.2 Climate Change  Apply zero and low carbon objectives as a
factor in all investment decisions in relation to
budgets and the Capital Plan.
To be confirmed. To be confirmed.
Page 94

Page 95

Appendix 3
5
Incorporate climate risks and adaptation
aspects into the corporate risk register.
4.3 Climate Change  Ensure the Climate Change Strategy and
associated Action Plan are living documents
and remain fresh and valid until 2035.
Routemap to Net Zero document is
updated annually. 
Climate Change Strategy is updated
every 5 years.
Staff time.
4.4 Climate Change Embed main CC Actions within relevant service
plans and similar to ensure they are developed
and progressed by service area. 
Review Climate Change and Biodiversity
assessment of committee papers. 
Continue to develop climate change guidance
for the mandate decision process. 
Contribute to the work of Scottish Climate
Intelligence Service (SCIS) and ClimateView.
Climate change actions included in
relevant service plans. 
Use of Climate Change guidance in
the mandate decision making
process. 
Populate SCIS working documents
and dashboards by verifying various
relevant Moray Strategies. 
Staff time.
4.5 Climate Change  Develop and deliver climate and nature
emergency training for staff and elected
members. 
Support the development of knowledge and
skills across departments – newsletters and
informal engagement etc.
Number of staff and councillors who
have participated in training. 
Training delivered to key target
groups. 
Climate change officers working with colleagues across the
council as necessary, particularly in Comms, OD.
4.6 Climate Change,
Quality
Improvement
Manager (QIM),
Support opportunities for teachers and pupils
to access knowledge and resources to embed
climate change and biodiversity in delivery of
the curriculum.
Number of opportunities provided
for schools to learn about climate
change and nature. 
Staff time/release for Professional Learning.
Partnership working – relevant partners. 
Nature Restoration Fund
Page 95

Page 96

Appendix 3
6
Education, STEM
Manager  Improve the quality of outdoor learning and
play spaces and experiences.
School inspections referencing
positive outdoor learning
experiences linked to curriculum and
learning about the environment,
including climate change and nature. 
RRSA engagement/Eco-schools’
involvement. 
Environmental Science Centre
opened. 
Moray Growth Deal (Early Year’s STEM) 
4.7 Organisational
Development
Monitor uptake of Ultra-Low Emission Vehicle
(ULEV) salary sacrifice scheme for employees. 
Take up of ULEV salary sacrifice
scheme. 
5. Procurement & Investment
5.1 Procurement –
Lead
Continue to deliver and record non-cash
benefits, such as sustainability, climate change
and community wealth building, through the
procurement process.
Number of contracts containing
climate change and community
wealth building statements.   
Actions in Council’s procurement
strategy. 
Information from Council’s annual
procurement report.
Staff time.
5.2 Procurement with
Climate change
team to assist
Deliver sustainable procurement guidance to
officers.
Number of training sessions of
procurement training identifying
climate change aspects in the
procurement process.
Staff time.
6. Nature, Biodiversity and Carbon Sequestration
6.1 Climate Change /
Open Spaces
Increase nature positive management of
council land. 
Actions / measures taken to enhance
biodiversity. 
Number of management plans in
place to improve biodiversity, and
sites in good ecological condition.
Staff time.
Nature Restoration Fund.
Page 96

Page 97

Appendix 3
7
6.2 Climate Change /
Strategic Planning
& Development
Co-ordinate a network of partners to progress
biodiversity actions at the local level and
support the development of Nature Networks.
Introduction of Moray Nature
Network map. 
Staff time.
Nature Restoration Fund.
6.3 Climate Change /
Open Spaces
Work with communities and partners to
facilitate nature-based skills and community
connection to nature. 
Partnership activities held with
Moray CAN and/or NESBiP. 
Elgin Nature & Nurture launched
(supporting role). 
Staff time, existing budgets and external funding.  
6.4 Climate Change Progress and monitor carbon sequestration
opportunities on council land holdings.
Indicative carbon offsetting plan
developed. 
Number of natural capital/carbon
sequestration projects established.
Staff time.
7. External Influence
7.1 Climate Change Co-ordinate delivery of LHEES Strategy.  LHEES Delivery Plan actions
progressed. 
Staff time.
7.2 Service Manager
Housing Strategy
Continue the Energy Efficiency Scotland: Area
Based Scheme (EES: ABS). 
Number of houses benefitting from
scheme / grant delivered.
External funding via Scottish Government.
7.3  Service Manager
Housing Strategy
Implement ECO4 Scheme via SCARF Aberdeen
(Will be ended 31 March 2026). 
Number of houses benefitting from
scheme / funding achieved.
External funding via OFGEM Energy Company Obligation i.e.
via energy company resources.
7.4 Sustainable Travel
Officer
Promotion of the Active Travel Strategy.  Number of engagement activities
undertaken to promote active travel. 
Number of active travel
improvements introduced. 
Staff time and external grant funding for behaviour change
initiatives. 
Physical infrastructure measures are delivered using capital
grants. 
Partnering with external organisations such as Cycling UK,
Health and Social Care Moray, Outfit Moray, Police Scotland
and Living Streets.
Page 97

Page 98

Appendix 3
8
7.5 Climate Change /
Fleet /Energy /
Property, as
appropriate
Continue to deliver the Moray Hydrogen
Strategy and explore accessing external funds if
resources allow.
Number of hydrogen opportunities
progressed in Moray. 
Hydrogen pilot progressed.
Staff time and revised EV Strategy to identify way forward
and funding routes for hydrogen fleet pilot.
7.6 Business Gateway Increasing provision of relevant skills and
knowledge for a greener economy to support
delivery of the Moray Apprenticeship Strategy. 
Number of engagements with
businesses.
Staff time.
7.7 Business Gateway Provision of business support and signposting
for climate mitigation and adaptation via
Business Gateway. 
Number of engagements with
businesses.
Staff time.
7.8 Climate Change in
partnership with
Moray Climate
Action Network
(Moray CAN),
Community
Planning
Partnership, and
public, private
and community
organisations.
Consulting community groups and residents
about climate action and delivering the Climate
Change Strategy. 
Support the work of Moray CAN. 
Support the development of an area-wide
Climate & Nature Partnership Plan along with
Moray CAN and the Moray Economic
Partnership – Communities and Place
Subgroup. 
Engaging with communities to facilitate
renewable energy projects. 
Continued and regular meetings with
Moray CAN, with actions arising
followed up promptly. 
Draft Moray- Climate and Nature
strategy created by October 2026.
Staff time.
7.9 Service Manager
Strategic Planning
& Development
Implement National Planning Framework 4
policies relating to the climate and biodiversity
crises.
Improved quality audit and
Planning Performance Framework
outcomes relating to climate change
and biodiversity. 
Number of training
sessions/engagements with
planners, and developers on climate
change and biodiversity, carbon
reduction and habitat creation.
Staff time.
7.10 Staff time.
Page 98

Page 99

Appendix 3
9
Service Manager
Strategic Planning
& Development
Develop Regional Spatial Strategy,
concentrating growth in existing centres,
identifying opportunities for carbon reduction
and renewable energy projects, woodland
expansion, peatland restoration.
Regional Spatial Strategy in place
with climate and nature
opportunities identified. 
7.11 Service Manager
Strategic Planning
& Development
Embedding climate and nature priorities into
new place based, people centred, delivery
focussed LDP.
Strategies in place and delivering
change.
Staff time.
7.12 Service Manager
Strategic Planning
& Development
Develop 20-minute neighbourhood concepts
for Moray’s main towns and embed within
LDP2027.
Plans in place and embedded within
LDP 2027.
Staff time.
7.13 Service Manager
Strategic Planning
& Development
Promote and support brownfield development
over greenfield development. 
Increased number of brownfield sites
used for new development. 
Staff time.
7.14  Service Manager
Strategic Planning
& Development /,
Senior Project
Manager Moray
Growth Deal
(MGD)
Deliver MGD, Housing Mix Delivery project. Number of new and of innovative
affordable homes enabled. 
Progress aspirational building
standards, biodiversity
enhancements, and connected
communities. 
Staff time. 
Moray Growth Deal.
7.15  Service Manager
Strategic Planning
& Development /
climate change
Update climate change and biodiversity
guidance for planning applications in line with
national guidance.
Guidance in place and delivering
change. 
Staff time.
7.16  Moray Growth
Deal
Deliver carbon reduction and climate change
commitments within Moray Growth Deal
projects.
Carbon and climate impacts
information in Moray Growth Deal
updates as appropriate, e.g. in
Annual Report.
Staff time. 
Moray Growth Deal.
Page 99

Page 100

Appendix 3
10 
8. Sustainable Development 
8.1 Climate Change  Ensure sustainable development is included
within Council decision making. 
Identify any further sustainable development
gaps. 
Consider and embed community views on
sustainable development.
Performance indicators reported
with Corporate Plans. 
Community involvement in CCS and
area-wide Climate & Nature
Strategy.
Staff time.
9. Adaptation
9.1 Climate Change  Create and maintain a climate impacts log.
Produce climate risk and nature-based solution
maps for larger towns.
Move towards the production of a Climate
Change Risk Assessment (CCRA).
Increased engagement with council
staff. 
Training delivered (number of
sessions/staff). 
Include summary of log in annual
report. 
No of towns with mapping complete. 
CCRA completed.
Staff time.
Existing budgets.
9.2 Climate Change
to coordinate
reporting
Align adaptation activities with Council’s
priorities. 
Integrate or mainstream adaptation action into
relevant service plans, strategies and reports.
Number of Council priorities and
service plans specificaly referring to
adaptation and climate risk. 
Staff time.
Existing budgets.
9.3 Climate Change
to coordinate
reporting 
Undertake annual benchmarking exercise. 
Implement flooding and coastal risk action
plans. 
Incorporate adaptation into the LDP. 
Implement a Moray Nature Network. 
Incorporate adaptation guidance into
climate change guidance for
developers. 
Measure proxies for adaptation
works as per Scottish National
Adaptation Plan (SNAP3), e.g. Nature
Network, number of Local Place
Plans, roads maintenance, etc. 
Staff time.
Existing budgets. 
Page 100

Page 101

Appendix 3
11 
Embed adaptation in the delivery of other
council activities, where appropriate.
Flood Risk Management Plan and
Coastal Change Adaptation actions
delivered (3 yearly). 
Adaptation activity included in
annual Routemap report. 
9.4 Climate Change
to coordinate
reporting
Work collaboratively with partners to progress
adaptation action. 
Encourage communities to consider climate risk
and adaptation.
Regional Climate Risk Assessment
undertaken 
Number of community resilience
plans in place. 
Integrate into Area-wide climate
change Partnership Plan
Staff time.
Existing budgets.
Scot Gov regional adaptation funding, with Aberdeenshire
and Aberdeen City  
Collaborate with Moray CAN and Community Planning
Partners
10. Just Transition
10.1 Senior Project
Officer – Climate
Change (Just
Transition)
Prepare to submit the bid to the Just Transition
Fund. 
Continue to engage with elected members,
Moray MP’s and MSP’s and JCC. 
Funding bid developed. 
Stakeholders engaged. 
Staff time.
Existing budgets. 
Page 101

Page 102

Appendix 4 
INTEGRATED IMPACT ASSESSMENT COVERING 
• EQUALITIES & SOCIO ECONOMIC DUTIES
• HUMAN RIGHTS AND RIGHTS OF THE CHILD 
DATE UPDATES/EXECUTIVE SUMMARY VERSION DETAILS
Insert Date
(e.g.
03/10/2023)
Add brief notes/highlight which section amended (e.g.
first draft of IIA completed and submitted to SFC
25/10/2023 for consideration; noting that further work
on Stage 2 will be required). 
Insert (ShP) Version Info
(when details have been
agreed) (e.g. 5.0
03/10/2023 11:21 AMcL)
15/04/2026 First draft IIA for Full Council on 6 May 2026 
STAGE 1 - DO I NEED AN INTEGRATED IMPACT ASSESSMENT?
Name of policy or proposal: Moray Council Climate Change Strategy
Is this a  Mark X below
New activity, programme or policy? 
Change to an existing activity, programme or policy? X
Budget proposal? 
Duties: tick the boxes you think apply No Maybe                                                                                                                                             Yes
Equalities: Will your proposal have an impact on groups with
protected characteristics?
Consider the impact of your proposal on people and how they access
your services and information without barriers. 
X 
Socio-economic 
Not every person/family has access to regular income or savings. Will
your proposal have an adverse impact on them 
X 
Does your proposal impact on the human rights of people?   X 
Does your proposal impact on the rights of children and young people  X 
Reasoning - Briefly describe your reasoning for the responses given above: 
Overall the strategy aims to have a positive impact, decreasing impacts of climate change by
encouraging adaptation and resilience, as well as positioning the council to reduce our climate
change emissions, however climate change will have more severe impacts on future generations and
those without the finances to adapt to the impacts which may cause potential indirect or unintended
impacts 
Page 102

Page 103

Appendix 4 
If you have answered “maybe” or “yes” to any of the Stage 1 questions above then proceed to
complete the Stage 2 Integrated Impact Assessment questions below. 
If you have answered “no” to the Stage 1 questions above then provide the details
below and submit to [email]
Lead Officer for developing the contract 
Other people involved in the screening (this
may be council staff, partners 
or others i.e. contractor or community) 
Date 
STAGE 2: INTEGRATED IMPACT ASSESSMENT
1. Describe what the service does: 
The Strategy sets out how the Council will respond to its statutory duties to reduce carbon
emissions, adapt to the impacts of climate change, and to embed sustainable principles
within the Council. This is the responsibility of all Council staff
2. Who are your main stakeholders? 
Council staff, members of the public, businesses and organisations impacted by council
activities or that have dealings with the council. 
3. What changes as a result of the proposals? Is the service reduced or removed?
The strategy does not propose a reduction or removal of a service. Instead, the intention is to
promote positive measures to reduce the councils contribution to council change, prepare
for the inevitable impacts of the changing climate and attempt to act in a sustainable
manner. If this is successful, it will reduce the impacts of climate change on vulnerable
groups, such as reducing flooding, preparing vital council services for weather events,
improving the energy efficiency of homes and promoting access to nature. 
4. How will this affect your customers?
Customers will benefit such as council house tenants reduced fuel bills and retrofitted
homes, alternatives to fossil fuel fleet to reduce air pollution in town centres, improved
health and wellbeing, climate anxiety reduced through planned actions, reduced impacts
from storms and interruptions to services, reduced flooding, greater resilience in service
provision. Access to greenspace and associated health benefits. 
5. Impact on staff providing the service
Insufficient internal capacity and funding may delay key projects or opportunities to leverage
funding. Groundwork to strengthen the Council’s position for advancing decarbonisation
projects and external funding is principally led by officers in Strategic Planning and
Development, Housing and Property, and Transportation. These services are under
significant workload pressures. 
6. Please indicate if these apply to any of the protected characteristics
Protected groups Potential impacts and considerations
Race  
Disability  Energy efficient proposals for homes, schools, and
office buildings aims to reduced bills, create
warmer, safer homes and encourage reduced
health issues. Active travel infrastructure will create
Page 103

Page 104

Appendix 4 
wider pathways and less conflict between different
users (wheelchairs, prams, cyclists, scooters, etc. 
Potential negative impact – All estate
improvements, such as active travel, energy
efficiency and retrofits has potential to cause
temporary disruption to tenants / residents which
could have a greater impact on those with mobility,
sensory or cognitive impairment. 
Carers (for elderly, disabled or
minors)
As above.
Sex UN Women statement - The climate crisis is not
“gender neutral”. Women and girls bear the brunt of
its impacts, which amplify existing gender
inequalities and pose unique threats to their
livelihoods, health and safety. 
While this is a global impact, Moray Council
contributing to climate change makes this a global
implication which the strategy seeks to assist in
reducing. 
Potential negative impact – any reduction in
provision due to a change in Morays climate may
disproportionately affect lone parents who are
predominantly women) or /in part-time low/paid
work.
Pregnancy and maternity (including
breastfeeding) 
Sexual orientation 
Age (include children, young people,
midlife and older people) 
Religion, and or belief 
Gender reassignment 
Inequalities arising from socio-
economic differences
Reduced fuel bills from energy efficiency measures
can assist those in fuel poverty. However, rural
poverty may be exacerbated by limited public
transport, higher costs of energy if off gas network
and electric pump heating can be more expensive if
not fitted correctly or if education and engagement
is not provided on how to use new systems 
List of Human Rights Describe, where applicable, if and how specific
rights are engaged
Article 5: Right to liberty and security 
Article 6: Right to a fair trial 
Page 104

Page 105

Appendix 4 
List of Human Rights Describe, where applicable, if and how specific
rights are engaged
Article 8: Right to respect for private
and family life, correspondence and
the home
Supports this right long term but potential impacts
could arise if decarbonisation of housing stock
poorly phased or inadequately funded, causing
temporary habitability issues and / or concerns re
any associated costs.
Article 10: Freedom of expression Those affected have a right to provide their views
on issues that affect them.  Inclusive engagement
required.
Article 11: Freedom of assembly and
association 
Article 12: Right to marry 
Article 14: Prohibition of
discrimination (in relation to the
convention rights) 
Article 1 of Protocol 1: Protection of
property 
Article 2 of Protocol 1: Right to
education 
Article 3 of Protocol 1: Right to free
elections by secret ballot 
Children’s Rights and Wellbeing 
Relevant articles – UNCRC 
Article 2 – Non discrimination 
Article 12 – Respect views of the child Right to have views heard on issues that affect
them
Article 3.1 – Best interest of the child Acting sustainably and reducing climate change
supports this right longer term
Article 6.2 – Right to survival and
development 
Article 27 – Adequate standard of living Supports this right longer term but potential to
experience short-term inequality if impacts are not
carefully managed 
7. Evidence. What information have you used to make your assessment?
Performance data Public Bodies Climate Change Duties Return 
Climate Change Plan and Route Map to Net Zero updates
Adaptation Benchmarking Report
How gender inequality and climate change are interconnected by
UN Women
Internal
consultation
The draft was developed following a series of workshops with
Elected Members and Council Officers.  
Page 105

Page 106

Appendix 4 
Consultation with
affected groups
Consultation was available on Moray Engage for 12 weeks.
Local statistics 
National statistics 
Other 
8. Evidence gaps 
Do you need additional information in order to complete the information in the previous
questions?
No 
9. Mitigating action 
Can the impact of the proposed policy/activity be mitigated?  Please explain 
Disability – Ensure reasonable adjustments considered for projects.  Consult on and provide
choice /options and flexibility in heating and transport transitions. 
Carers – as above
Phasing and flexibility throughout strategy delivery
Inclusive engagement
Consider possibility of targeted financial and practical support if needed
Ensure fuel poverty is not exacerbated by decarbonisation 
10. Justification
If nothing can be done to reduce the negative impact(s) but the proposed policy/activity
must go ahead, what justification is there to continue with the change?  
While some potential indirect or unintended negative impacts have been identified, these
are not considered significant or disproportionate.  Overall, the strategy aims to reduce
inequalities, disadvantage and promote inclusion through providing a healthier, improved
environment to benefit both current and future generations. 
SECTION 3 CONCLUDING THE IIA
1. No potential negative impacts on any protected groups were found. 
2. Some potential negative impacts have been identified relating to : X
Reducing discrimination, harassment, victimisation or other conduct
prohibited under the Equality Act 2010
X
Promoting equality of opportunity X
Fostering good relations X
3. The proposals interfere with human rights and/or the rights of the child 
4. Negative impacts can be mitigated as outlined in question 9. X
5. The negative impacts cannot be fully mitigated but are justified as Q10. 
6. Further consultation with affected groups is needed. 
7. It is advised not to go ahead with the proposals. 
Decision - Set out the rationale whether to proceed with the proposal or not: 
Page 106

Page 107

Appendix 4 
Date of Decision: 
Sign off and authorisation: 
Service Strategic Planning & Development
Department Economy, Enterprise & Operations
Policy/activity subject to IIA Climate Change Strategy
We have completed the integrated impact
assessment for this policy/activity. 
Name: Rod Lovie
Position: Principal Climate Change Officer
Date: 15/04/2026
Authorisation by head of service  Name: 
Position: 
Date:
Permission to publish on website - 
Please return this form to the Equal Opportunities Officer, Chief Executive’s Office. 
Page 107

Page 108

Page 108

Page 109

Report to: Moray Council  Meeting Date: 30 June 2026  
Report by: Executive Director, Finance, Strategy and Transformation
Author: Susan Souter Contact Email: susan.souter@moray.gov.uk 
Subject: 2025/26 Revenue Out-turn Variances from Budget 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to advise the Council of the major variances from the
approved budget in the actual out-turn for 2025/26 revenue budget.  
1.2  This report is submitted to Council in terms of Section II (25) of the Council’s Scheme of
Administration relating to the approval of the annual estimates of revenue expenditure for
all services and of Section III (B) (6) relating to monitoring current expenditure in relation to
approved estimates. 
2.  SUMMARY  
2.1  This report presents the closing financial position of the Council’s revenue budgets for
2025/26. The final accounts process is underway, with draft annual accounts being
reported to this meeting. The figures are subject to final audit review and any further
adjustments to these figures will be reported back to Members.  
2.2  The final outturn for 2025/26 shows total expenditure of £299,904,000 against an
approved budget of £302,277,000, representing a net underspend of £2,373,000 on
expenditure. After taking account of transfers to reserves and funding movements, this
results in an overall net overspend of £230,000. This reflects a favourable movement
compared to the overspend of £1,635,000 forecast at Q3.  
2.3  The outturn position includes funding received during the year that is required to be
transferred to earmarked reserves in line with funding conditions and is therefore not
available to support the General Fund. After taking account of funding from the Scottish
Government, Council Tax income and the planned use of reserves, the detailed
movements are set out in the body of the report. 
Item 8.
Page 109

Page 110

2.4  After applying funding from the Scottish Government (£241,191,000) and Council Tax
receipts (£57,148,000) the use of reserves to balance the expenditure totals £1,566,000.
The planned transfers from revenue reserves to fund service expenditure include:
Transformation £1,393,000; Devolved School Management (DSM) £59,000; and a net
transfer in to earmarked reserves of £222,000, leaving a residual balance of £336,000 to
come from the Council Priorities reserve. This reflects the total use of reserves required to
balance the outturn position. The variance against the approved budget is an overspend of
£230,000, with the difference reflecting the level of reserves assumed within the original
budget.  
2.5  The unaudited accounts for 2025/26 are subject to a separate report to this Committee.
The unaudited accounts show that the balance on free general reserves remains at
£6,000,000 at 31 March 2026 and other ear-marked reserves of £21,604,000, totalling
£27,604,000, compared to £29,284,000 at 31 March 2025. 
3.  RECOMMENDATIONS 
3.1  It is recommended that Council:   
i)  notes the Council’s year end financial position for 2025/26, being an
overspend of £230,000 on total expenditure; 
ii)  considers and scrutinises the major variances from the approved budget for
2025/26 as summarised in Appendix 1 and detailed in Section 5 of this report; 
iii)  notes the status of the approved savings for 2025/26; 
iv)  approves the additional £93,000 to be funded from the Transformation
Reserve for the SWAN2 (Wide Area Network) project implementation costs;
and 
v)  notes the transfer of unspent funding to earmarked reserves in line with
funding conditions.   
Susan Souter
Service Manager Strategic Finance 
4.  BACKGROUND AND CONTEXT  
4.1  The Council approved the General Fund Revenue Budget at a meeting on 26 February 2025
(paragraph 3 of the minute) with budgeted expenditure of £294,197,000. Council Tax
receipts of £57,320,000 were anticipated. As part of the budget setting process, Members
had approved £7,889,000 of savings in the year. No use of reserves were planned to
balance the budget.  
4.2  In addition to the core budget, unspent balances from the DSM scheme are carried
forward each year. The DSM balance brought forward into 2025/26 is £214,000, unused
Pupil Equity Fund (PEF) (£766,000), Strategic Equity Funding (SEF) (232,000) and £25,000
from nursery snacks and fundraising have also been carried forward in line with grant
Page 110

Page 111

conditions. These budgets operate on an academic year cycle, resulting in recurring carry-
forwards. Other earmarked reserves have also been carried forward in line with conditions
and can be seen in Appendix 4.  
4.3  Expenditure against budget is reported to Committee on a quarterly basis during the
financial year, with projected outturn figures reported at Q2 and Q3. Q1 was reported to
Corporate Committee on 26 August 2025 (para 5 of the minute); Q2 to Full Council on 3
December 2025 (para 12 of the minute) and Q3 to Corporate Committee on 17 February
2026 (para 6 of the minute). In recognition of the expected overspend as at Q2 2025/26 an
emergency stops notice was issued by the Chief Executive in December 2025 asking
officers to consider all revenue expenditure and progress with essential spend only.  
4.4  Movements in the base budget from the position reported at Q3 2025/26 are shown in
Appendix 2. The most significant changes to the overall funding position relate to
additional General Revenue Grant (GRG) allocations confirmed by the Scottish
Government following the formal redetermination of grant. This includes additional
funding of £1,316,000 in respect of the local government pay award and £502,000 in
respect of the teachers’ pay award. In addition, a number of smaller in-year
redeterminations have been received from the Scottish Government.  
4.5  At Q3, the latest forecast projected an overspend of £1,635,000 against the approved
budget. This reflected a number of service pressures, particularly within Education,
Environmental and Commercial Services and Financial Services, partially offset by
favourable movements in other service areas and Loans Charges. The Q3 position
provided an updated view of expected year end performance and informed ongoing budget
monitoring. 
4.6  The financial forecast for the year plays an important role in informing the budget-setting
process. The variances and trends identified through quarterly monitoring provide a basis
for reviewing and, where necessary, adjusting the proposed budget for the 2026/27
financial year.  
4.7  Following the management restructure approved by Council in April 2025 and referenced
in the Q3 monitoring report, service budgets and reporting arrangements have been fully
realigned for Q4. As a result, this report presents the final outturn position for 2025/26
based on the revised structure, ensuring consistency between operational and financial
reporting. While the Q3 report included an estimated outturn based on the previous
structure, direct comparison at service level is limited. The commentary within this report
focuses on the final outturn position against the approved budget, with reference made to
key pressures and movements previously reported at Q3 where relevant.  
4.8  It should be noted that the final outturn position includes funding received during the year
that is required to be transferred to earmarked reserves in line with funding conditions. As
a result, the headline expenditure position therefore differs from the underlying General
Fund position. 
Page 111

Page 112

5.  PROPOSALS  
5.1  Appendix 1 sets out the budget compared to the actual out-turn at the end of March 2026,
summarising the General Fund net expenditure and how it is financed. 
5.2  The final outturn position for 2025/26 shows total expenditure of £302,507,000 against an
approved budget of £302,277,000, representing a net overspend of £230,000 on
expenditure. This position reflects a combination of favourable and adverse variances
across the revised service structure implemented during the year. The most significant
favourable movements arose within Growth, Planning & Climate, Culture, Leisure & Sport
and Governance, while the most significant adverse movements arose within Financial
Services, Education and Out of Area and People, Change & Community Strategy. Within
the overall position, Loans Charges report a net underspend of £141,000 and Provisions a
net underspend of £397,000.  
5.3  The table below summarises the final outturn position by Executive service under the
revised structure. As outlined in paragraph 4.6, direct comparison with the Q3 position at
service level is limited due to the implementation of the management restructure during
the year. The commentary that follows therefore focuses on the final outturn against
approved budget, with reference to key movements from Q3 where these remain relevant
to the year end position. The table below provides a summary of the outturn position at
Executive Director level under the revised structure. 
5.4  
Variances Outturn Adjusted
Annual
Budget
£000
Actual
£000
Year End
Variance
Under/(over) 
£000 £000 £000
Service Expenditure   
Economy, Enterprise & Operations 38,154 36,066 2,088
Education, Housing & Communities 132,863 132,783 80
Finance, Strategy & Transformation 15,008 15,406 (398)
Chief Executive Function 657 725 (68)
Health & Social Care (Non MIJB) 478 345 133
Health & Social Care (MIJB) 90,060 90,060 -
Loans Charges 24,660 24,519 141
Provisions 397 - 397
General Services expenditure 302,277 299,904 2,373
Transfer In to Earmarked Reserves - 2,603 (2,603)
Net position after transfers 302,277 302,507 (230)    
Funding   
Scottish Government Grant 241,125 241,191 66
Council Tax 57,470 57,964 494
Less Council Tax on 2nd Homes - (816) (816)
Use of Reserves   
Page 112

Page 113

DSM, PEF, ELC Nursery 1,004 1,004 -
Transformation 1,292 1,393 101
Other Earmarked 1,386 1,435 49
Moray Growth Deal - 336 336
Total Use of Reserves 3,682 4,168 486
Total Funding 302,277 302,507 (230)     
5.5  Appendix 1 and the table above highlight the following key points: 
•    Expenditure is underspent against budget at year end by £2,373,000.   
•    A significant proportion of this favourable position relates to funding received during
the year that has not been spent and is required to be transferred to earmarked
reserves in line with funding conditions. These amounts do not represent a benefit to
the General Fund and therefore do not improve the underlying financial position. 
•   After adjusting for these transfers, the underlying General Fund position reflects a net
overspend of £230,000. 
•    At Executive Director level, the most significant favourable variances are within
Economy, Enterprise & Operations (£2,088,000) and Education, Housing &
Communities (£80,000), offset by an adverse position within Finance, Strategy &
Transformation (£398,000). It is noted that the variance table shows the Health and
Social Care (MIJB) being flat on budget cost. However, this reflects that the budget was
increased to cover increased costs in the year, as the MIJB needs to be fully funded. The
MIJB costs did increase significantly in year and is detailed in section 5.79 below. 
•    More detailed service-level variances are shown in paragraph 5.6 below. 
•    The most significant favourable service-level variances arise within Growth, Planning &
Climate (£996,000), Culture, Leisure & Sport (£467,000) and Governance (£387,000),
primarily driven by vacancy savings and strong income performance. 
•    The most significant adverse service-level variances arise within Education and Out of
Area (£2,313,000), Financial Services (£342,000) and People, Change & Community
Strategy (£170,000), reflecting a combination of demand-led pressures and one-off
costs incurred during the year. 
•    Loans Charges show a small net underspend (£141,000), reflecting movements in
interest payable, principal repayments and interest on revenue balances, while
Provisions are underspent by £397,000 following updated assessments of budget
requirements. 
•   Council Tax income is above budget; however, this includes £816k relating to additional
income from reduced Council Tax discounts on second and long-term empty
properties, which is transferred to the Housing Revenue Account, resulting in a  net
shortfall against the General Fund. 
Page 113

Page 114

5.6  The table below provides a detailed breakdown of the outturn position by service.   
5.7   
Adjusted
Annual
Budget 
Actual  Unadjusted
Variance
Under/
(over)
Transfer to
Earmarked
Reserves
Year End
Variance
Under/
(over) 
£000 £000 £000 £000 £000
Economy, Enterprise
and Operations     
Growth, Planning and
Climate
4,177 2,599 1,578 582 996
Operations and
Environment
31,156 31,033 123 - 123
Governance 2,821 2,434 387 - 387
Education, Housing and
Communities     
Culture, Leisure & Sport 4,609 4,142 467 - 467
General Services
Housing
5,535 5,502 33 128 (95)
Education & Out of Area 122,719 123,139 (420) 1,893 (2,313)
Finance, Strategy and
Transformation     
Customer Experience,
ICT & Digital Services
5,872 5,758 114 - 114
People, Change &
Community Strategy
5,303 5,473 (170) - (170)
Financial Services 3,833 4,175 (342) - (342)
Chief Executive
Function
657 725 (68) - (68)
Health & Social Care     
Health and Social Care
and Children’s Services
(MIJB)
90,060 90,060 - - -
Health and Social Care
(non MIJB)
478 345 133 - 133
Loans Charges 24,660 24,519 141 - 141
Provisions 397 - 397 - 397      
Total 302,277 299,904 2,373 2,603 (230) 
Quarter 3 v’s final outturn
5.8  Although direct comparison at service level is limited due to the revised structure
introduced during the year, a high-level comparison between the Q3 forecast and the final
outturn position is provided below. The movement from the Q3 forecast to the final outturn
reflects a combination of improved service outturns in the final quarter, together with
Page 114

Page 115

updated positions in Loans Charges and Provisions. As noted elsewhere in the report, part
of the favourable movement relates to £2,603,000 of funding received during the year that
has been transferred to earmarked reserves and therefore does not improve the underlying
General Fund position.  
5.9  
Variances Outturn Final year
£000
Q3
£000
Outturn
Variance
Fav/(Unfav)
£000
Service Expenditure 185,325 194,510 9,185
Moray Integration Joint Board (MIJB) 90,060 86,188 (3,872)
Loans Charges 24,519 18,886 (5,633)
Provisions - 2,438 2,438
Add: Transfer in to Earmarked Reserves 2,603 - (2,603)
General Services expenditure 302,507 302,022 (485)    
Funding   
Scottish Government Grant 241,191 239,071 2,120
Council Tax 57,964 57,470 494
Less: Council Tax on 2nd Homes (816) - (816)
Use of Reserves   
DSM 59 213 (154)
Transformation 1,393 1,332 61
Other Earmarked 2,380 2,301 79
Moray Growth Deal - - -    
Total Use of Reserves 3,832 3,846 (15)    
Total Funding 302,171 300,387 1,783    
Net Overspend (336) (1,635) 1,299     
5.10  Although direct comparison at service level is limited due to the revised structure
introduced during the year, the overall movement from the Q3 forecast to the year-end
position can be explained at a high level. At Q3, the Council was forecasting a net
overspend of £1,635,000. By year end, this had improved to an overall net overspend of
£336,000, a favourable movement of £1,299,000. 
Taken together, these movements explain the overall improvement from the Q3 forecast to
the final outturn: 
•  Operational services improved significantly, most notably within Operations &
Environment, where a forecast £400,000 overspend improved to a £123,000
underspend. This was largely due to a better than expected position in Waste services,
partly offset by higher winter maintenance costs. 
Page 115

Page 116

•  Economic Growth performed better than forecast, with the underspend increasing
from £810,000 to £996,000, reflecting strong income performance and staffing
vacancies. 
•  Education remained broadly in line with the Q3 forecast, with the £2.31m overspend
largely driven by Out of Area placements, offset by in-year underspends in areas such
as energy and staffing. 
•  Financial Services remained consistent with Q3, with the overspend reflecting ongoing
pressures in Non-Domestic Rates reliefs and one-off legal costs, partly offset by
staffing savings and additional income. 
•  At Q3, a residual overspend of £670,000 was anticipated in respect of the MIJB, after
the planned use of £3,400,000 of central provision, based on a higher forecast
overspend. The final position was more favourable than anticipated and the additional
provision was not required. However, additional costs of £650,000 have been incurred
in relation to staff regrading. The overall position therefore reflects an improvement
compared to that assumed at Q3, while underlying demand pressures remain. 
•  Loans Charges were less favourable than forecast, with the underspend reducing from
£573,000 at Q3 to £141,000 at year end. 
•  Staffing vacancies exceeded Q3 assumptions across a number of services, generating
additional in-year savings which contributed to the improved overall position.   
Service Department Variances
5.11  Staffing continues to represent the single largest cross-service variance, with vacancy
savings reported across a number of services. These savings are largely non-recurring and
reflect in-year vacancies rather than sustainable reductions in staffing costs.  
5.12  In terms of income, including recharges to capital projects and the Housing Revenue
Account (HRA), services are reporting a mix of favourable and adverse variances. In
several cases, favourable income performance reflects increased activity levels or revised
charging arrangements. However, some income streams remain demand-led or subject to
market conditions, and therefore present ongoing uncertainty. In addition, a proportion of
income relates to funding allocated for specific purposes, including education funding
such as Pupil Equity Funding (PEF) and Strategic Equity Funding (SEF), which operate on
an academic year cycle. Where this has not been spent in-year, it has been transferred to
earmarked reserves and does not support the General Fund position.  
5.13  A number of underlying recurring pressures remain, particularly within demand-led
budgets such as Out of Area placements, Non-Domestic Rates reliefs and key operational
services. These pressures have been partially offset in-year by non-recurring savings,
including vacancy savings, one-off income and timing differences. 
5.14  While the overall position has improved since Q3, this largely reflects non-recurring
variances. The underlying position across many services remains constrained and will
require ongoing management in 2026/27.  
Page 116

Page 117

5.15  Each Service area’s budget versus actual variations are outlined below. The tables
highlight the most significant variances within each service. The residual balance
represents the remaining budgets not specifically listed, where variances are individually
small or broadly in line with budget. These are shown as a single aggregated figure for
completeness.   
Growth, Planning and Climate
5.16  The service reports an underspend of £1,578,000 at year end against the approved budget.
After taking account of £585,000 of grant funding carried forward to earmarked reserves,
the reported year-end variance increases to £996,000.   
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000    
Staffing   
Vacancy target (431) (845) 414    
Income   
Building Standards (760) (1,053) 293
Planning (1,536) (1,615) 79
Landlord Registration (63) (86) 23
Grampian Venture Capital Fund - (93) 93    
Expenditure   
Bad Debt - 25 (25)
Professional Fees (Moray Economic
Partnership, Moray Growth Deal,
Climate Change LHEE, Geospatial
Agreement)
94 10 84    
Residual Variances 6,873 6,256 617    
Underspend 4,177 2,599 1,578
Transfers to Earmarked Reserves:   
Coastal Communities Fund - 171 (171)     
Nature Restoration Fund - 69 (69)     
Fairer Futures Funding (Adopt &   
Adapt)- Employability
- 70 (70)     
Elgin Neighbourhood Board - 272 (272)    
Net Underspend 4,177 3,181 996 
5.17  The favourable position is largely driven by staffing vacancies and higher than anticipated
income, partially offset by minor expenditure pressures. 
Page 117

Page 118

5.18  Within staffing, vacancy savings of £414,000 have been achieved across the service due to
ongoing recruitment challenges in professional roles. While Service Managers are now in
post and are expected to review this in 2026/27, this reflects a continuing issue in
attracting suitably qualified staff. 
5.19  Income from Building Standards, Planning and Landlord Registration has exceeded budget
by £395,000 in total. This reflects an exceptionally high level of activity during the year,
including large energy consent applications, a distillery development and works at Forres
Academy. It is recognised that this level of income is non-recurring and unlikely to be
sustained in future years. In addition, income of £93,000 has been received from the
liquidation of the Grampian Venture Capital Fund following Council approval on 3
December 2025 (paragraph 20 of the minute refers) to wind up the fund and distribute
remaining assets to shareholders. In line with that decision, the receipt is treated as a
one-off revenue item and has been applied to offset Economic Growth expenditure. 
5.20  Across other budgets, underspends within professional fee budgets (£66,000) have arisen
as a result of the service accessing external grant funding to support studies and advisory
work in-year. A recurring saving of £18,000 has been identified following a review of the
Public Sector Geospatial Agreement. The service also received £582,000 of external grant
funding during the year which has not yet been spent and has therefore been transferred
to earmarked reserves to support future activity. Overall, £1,560,000 of the underspend
relates to non-recurring items, including one-off income and grant funding carried
forward, while only £18,000 represents a recurring saving. The final outturn is broadly
consistent with the position reported at Quarter 3, with continued vacancy savings and
strong income performance maintained through to year end.   
Operations and Environment
5.21  The service reports a net underspend of £123,000 at year end against the approved
budget. The overall position reflects significant offsetting variances across service areas,
with pressures within Roads and Fleet offset by favourable positions in Waste, Catering
and Traffic & Transport.   
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000
Staffing   
Vacancy target (886) (1,253) 367    
Income   
Open Space – Burial Grounds (1,002) (907) (95)
Open Space – Grounds Maintenance (1,334) (1,357) 23
Catering (3,133) (3,214) 81
Waste – Recycling (349) (559) 210
Waste – Bulky Waste (41) (61) 20
Waste – Tipping (151) - (151)
Waste – Dallachy Gas Contract (78) (71) (7)
Waste – Green Waste (1,069) (1,040) (29)
Waste – Trade Waste (1,128) (995) (133)
Page 118

Page 119

Roads Management (8,257) (7,770) (487)
Design Consultancy (387) (301) (86)
Transportation – Car Park income (1,166) (940) (226)    
Expenditure   
Open Space 1,244 1,223 21
Roads Management 10,232 9,281 951
Roads Management – Winter
Maintenance
1,824 2,947 (1,123)
Traffic & Transportation   
Waste Management 6,082 5,823 259
Building Catering & Cleaning 4,110 4,029 81
Fleet Services 2,009 2,588 (579)
Design Consultancy 403 352 51
Transportation – Car Park Pay by
Phone fees
29 44 (15)    
Residual Variances 24,204 23,213 991
Net Underspend 31,156 31,033 123 
5.22  Roads Management reports an overspend of £650,000 at year end. This is primarily driven
by Winter Maintenance costs, with an overspend of £1,123,000 following a particularly
severe winter, worsening the Q3 position. Excluding Winter Maintenance, Roads reports an
underspend due to lower employee and materials costs following service reviews linked to
a reduced capital programme. This has been partly offset by reduced recharge income to
capital as staff were redeployed to Winter Maintenance activities. 
Traffic and Transportation reports an underspend of £380,000. The favourable position
reflects strong income performance across permits and operational activity, together with
controlled expenditure during the year. 
Waste Management reports an underspend of £170,000, a significant improvement from
the projected overspend at Q3. This is mainly due to lower than anticipated costs at the
NESS facility, together with savings in fuel and recycling contract costs. Recycling income
also continued to perform strongly throughout the year. These favourable movements are
partly offset by ongoing pressures from the loss of tipping income following the closure of
Dallachy and reduced income from the Trade and Green Waste services. 
Building Cleaning and Catering reports an underspend of £156,000. This reflects
increased income from school meals alongside underspends in food, transport, materials
and supplies, with performance improving further in the final quarter compared to Q3
estimates. 
Fleet Services reports an overspend of £152,000 at year end. However, this position is
influenced by year end allocation adjustments and the underlying outturn is a small
underspend. Operational pressures within vehicle running costs, external hires and
contractor costs have been largely offset by strong recharge income across services. 
Page 119

Page 120

Design Consultancy reports an overspend of £31,000, primarily due to an income
shortfall arising from staffing constraints, partially offset by lower property-related
expenditure. 
Open Space reports a small overspend of £9,000. Burial Grounds income underachieved
during the year but was largely offset by underspends in staffing and operating costs.
Grounds Maintenance delivered additional income but experienced higher vehicle and
insurance costs, resulting in a broadly balanced position overall. 
Marine Services reports an underspend of £108,000 while centrally held budgets within
the Directorate are broadly on budget.  
5.23  In staffing, vacancy savings of £367,000 have been achieved across the service, over and
above the vacancy factor. This reflects ongoing recruitment challenges. The underspend
has supported the overall position but also reflect capacity constraints within operational
services. 
5.24  Income performance is mixed across the service. Strong performance has been achieved
in areas such as Recycling (£210,000 favourable) and Catering (£81,000 favourable)
reflecting high levels of activity. These gains are partially offset by income shortfalls in
Roads recharges to Capital (£549,000 adverse), Trade Waste (£133,000 adverse) and the
loss of tipping income (£151,000 adverse) following the closure of Dallachy landfill site.
Income from green and trade waste services has underperformed against budget, despite
price increases, indicating reduced demand. Recycling income has performed strongly
during the year, however this is influenced by market conditions and may not be
sustained. 
5.25  Overall, £1,139,000 of the favourable position relates to non-recurring items, including
one-off income movements, timing differences and savings linked to the closure of the
Dallachy landfill site. This is offset by underlying recurring pressures of £1,021,000,
primarily within Winter Maintenance, lost tipping income, and operational cost pressures
across Roads, Fleet and Waste services. 
5.26  The final outturn therefore reflects a position where non-recurring savings have offset
underlying service pressures. While the position has improved from Quarter 3, particularly
within Waste Management and Roads Maintenance, ongoing pressures remain within key
operational areas going into 2026/27.   
Governance
5.27  The service reports an underspend of £387,000 at year end against the approved budget. 
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000
Staffing   
Vacancy target (495) (714) 219    
Page 120

Page 121

Income   
Registrars (126) (139) 13
Licensing income (322) (407) 85
Recharges to HRA (41) (50) 9    
Other   
Members Services 976 963 13    
Residual Variances 2,807 2,796 11
Net Underspend 2,821 2,434 387 
5.28  The favourable position is primarily driven by staffing savings and higher than anticipated
income, with only minor expenditure variances. 
5.29  In staffing, an underspend of £219,000 has been achieved due to vacancies within Legal
Services, particularly solicitor roles that proved difficult to recruit to during the year.
Recruitment to these posts has been reviewed, with regrading undertaken to improve
future resilience. The net underspend reflects the offsetting use of external legal support
where required. 
5.30  Income across the service exceeded budget by £107,000. Registrars income was higher
than anticipated, reflecting increased activity in marriages, civil partnerships and deaths,
and is considered to be a recurring favourable variance. Licensing income also exceeded
budget, largely driven by short-term let licence fee income. While this is currently
favourable, it is considered non-recurring pending review of fees to ensure full cost
recovery. Recharges to the HRA were also higher than budget, contributing to a small
recurring underspend. 
5.31  In other variances, Members Services reported a small underspend of £13,000. Overall,
£44,000 of the underspend is recurring, with the remaining £332,000 reflecting non-
recurring items, primarily vacancy savings and income fluctuations. 
5.32  The final outturn reflects a broadly consistent position with Q3, with vacancy savings and
strong income performance maintained through to year end. Following the service
restructure implemented during the year, budgets have been realigned within Governance;
however, this has not materially impacted the overall outturn position.   
Culture, Leisure and Sport
5.33  The service reports an underspend of £467,000 at year end against the approved budget. 
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000
Staffing   
Vacancy target (222) (443) 221    
Income   
Sport & Leisure (2,226) (2,342) 116
Page 121

Page 122

Music Instruction recharge to schools (12) (20) 8    
Other   
Energy underspend 551 469 82    
Residual Variances 6,518 6,478 40
Net Underspend 4,609 4,142 467 
5.34  The vacancy target has been exceeded by £221,000, largely due to vacancies arising from
the review of Leisure and Libraries services. Recruitment to these posts is now progressing
following completion of the review. The final position is lower than previously forecast,
reflecting the removal of the vacant Head of Service post as part of the management
restructure. 
5.35  Leisure income exceeded budget by £116,000, reflecting strong demand across the
service. Budgets are currently being realigned following the service review, and
opportunities for recurring savings will be considered once this exercise is complete.
Income from music instruction recharges to schools also exceeded budget, contributing a
further favourable variance. 
5.36  An underspend of £82,000 has been achieved within energy budgets following a review
undertaken in Q4. It had been anticipated that budget would be reallocated to other
services; however, not all of the provision was required, resulting in a year-end
underspend that had not been forecast at Q3. 
5.37  Overall, £2,566,000 of the favourable position relates to non-recurring items, including
timing differences, energy budget movements and income fluctuations, which offset an
underlying recurring pressure of £2,099,000. This reflects the current budget position
within the service pending completion of the service review and realignment of budgets. 
5.38  The final outturn therefore reflects a position where non-recurring savings have offset
underlying recurring pressures. Following completion of the service review and
management restructure, budgets are in the process of being realigned; however, this
does not materially impact the outturn position reported.   
General Services Housing
5.39  The service reports an underspend of £33,000 at year end against the approved budget.
With £128,000 of grant funding carried forward to earmarked reserves, the reported year-
end variance increases to £95,000 overspend.   
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000
Staffing   
Vacancy target (428) (541) 113    
Income   
Property fee income (1,254) (1,121) (133)
Page 122

Page 123

Renewable Heat Incentive payments (110) (152) 42
Industrial Estate rental income and
wayleaves
(2,587) (2,722) 135
Accountancy in Bankruptcy (22) (45) 23
Recharges to HRA Sheltered Housing
staffing
(82) (135) 53
Held for Sale Asset Misc Land Sales (30) (5) (25)    
Expenditure   
Corporate buildings repairs and
maint.
935 774 161
School Buildings repairs and maint. 1,081 1,287 (206)
Homeless temporary
accommodation
77 150 (73)
Improvement grants (net) 186 282 (96)
Industrial Estates repairs and maint. 70 53 17
Surplus property costs 32 75 (43)
Benefits software 87 134 (47)
Housing Benefits (net) (26) 142 (168)
Discretionary Housing Payments (net) 884 847 37
Rapid Rehousing Transition Plan 170 106 64
PPP deductions/utilities/unitary
charge
1,518 1,566 (48)
Repairs budget Urquhart Place 33 2 31
Shared Buildings energy costs 385 351 34    
Funding to/from reserves   
Scottish Welfare Fund overspend 85 85 -
Refugee resettlement programme (28) (162) 134    
Residual Variances 4,550 4,531 28
Overspend 5,535 5,502 33
Transfer to earmarked reserves - 128 (128)
Net Overspend 5,535 5,630 (95) 
5.40  The overall position reflects a number of offsetting variances, with underlying income
shortfalls and expenditure pressures largely offset by favourable in-year movements. 
5.41  Vacancy savings of £113,000 have been achieved across the service. However, these
savings are largely non-recurring and reflect in-year vacancies rather than sustainable
reductions in staffing costs. 
5.42  Income performance is mixed across the service. Property fee income is below target by
£133,000, reflecting a continuing structural shortfall. This is partly offset by higher than
expected income from Industrial Estate rentals and wayleaves (£135,000 favourable),
although this is largely non-recurring and subject to market conditions. Renewable Heat
Incentive income also exceeded budget, contributing a further favourable variance. While
Page 123

Page 124

some of these favourable movements are considered recurring based on recent trends,
others are more variable and subject to market conditions. 
5.43  The main expenditure pressures arise within repairs and maintenance budgets and
demand-led services. Schools repairs and maintenance overspent by £206,000 due to
ongoing essential works across the estate. Homeless temporary accommodation costs
exceeded budget by £73,000, reflecting sustained demand, while improvement grants
overspent by £96,000 linked to higher uptake. Corporate buildings maintenance reported
an underspend of £161,000, partially offsetting these pressures. Other smaller variances
include overspends within surplus property costs and minor underspends across
industrial estate maintenance. 
5.44  Overall, £125,000 of the favourable position relates to non-recurring items, including
vacancy savings and timing differences in income and expenditure. This is offset by
underlying recurring pressures of £89,000, primarily within property income and demand-
led expenditure areas. 
5.45  The final outturn reflects a deterioration from the position reported at Q3, primarily due to
increased pressures within repairs and maintenance and demand-led services in the final
quarter. Following the service restructure, budgets have been realigned within Housing;
however, the underlying pressures identified remain consistent with those reported at Q3.   
Education and Out of Area
5.46  The service reports an overspend of £420,000 at year end against the approved budget.
After taking account of £1.89m of grant funding carried forward to earmarked reserves, the
reported year-end variance increases to £2,313,000. 
5.47   
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000
Staffing   
Vacancy target (1,577) (1,751) 174    
Expenditure   
DSM – primary devolved 23,582 23,492 90
DSM – secondary devolved 26,587 26,501 86
School non-devolved costs 25,970 25,713 257
ELC fundraising/snack 25 - 25
ELC partner providers 8,888 9,138 (250)
Out of Area placements 3,402 5,122 (1,720)
PEF - (751) 751
SEF - (275) 275
Central Supply 1,913 2,062 (149)    
Residual Variances 33,929 33,888 41    
Overspend 122,719 123,139 (420)
Page 124

Page 125

Transfers to earmarked reserves - 1,893 (1,893)    
Net Overspend 122,719 125,032 (2,313) 
5.48  Vacancy target has exceeded budget by £174,000 across the service. This reflects changes
arising from the ASN review and ELC Change Management Programme, together with
restructure adjustments. These savings are not expected to be recurring as service
structures are now stabilised. 
5.49  Core service budgets report a number of favourable variances. Devolved School
Management (DSM) budgets are underspent across both primary and secondary sectors,
while non-devolved school costs are underspent by £257,000, largely due to reduced
energy costs during the year. It remains uncertain whether this position is sustainable
given ongoing volatility in energy prices. Underspends within PEF and SEF will be carried
forward in earmarked reserves in line with funding conditions. As outlined in paragraph
4.2, these funding streams operate on an academic year cycle and are ringfenced for
specific purposes; any unspent balances are therefore required to be carried forward and
do not contribute to the General Fund position. 
5.50  The most significant pressure within the service relates to Out of Area placements, which
overspent by £1,720,000. This remains a major financial risk, with the recurring element
dependent on existing placements and any new demand arising during 2026/27.
Further pressures were experienced within Early Learning and Childcare partner provider
payments (£250,000 overspend), reflecting increased demand. At this stage, it is not yet
clear how much of this pressure will be recurring. Central supply budgets also reported an
overspend, primarily due to coding issues and costs associated with sickness and
absence cover. Actions have been taken to improve monitoring going forward, and the
pressure is not expected to recur at the same level. 
5.51  ELC fundraising income has not been spent in-year and will be carried forward in
earmarked reserves. Overall, the position includes a net recurring saving of £1,925,000,
offset by £1,464,000 of non-recurring pressures, although the recurring position is heavily
influenced by vacancy savings that are not expected to continue. The final outturn is
broadly in line with the Q3 position, with the underlying position continuing to be driven by
demand-led pressures, particularly within Out of Area placements. 
5.52  Overall, £1,522,000 of the position relates to non-recurring items, including funding
carried forward in earmarked reserves and other timing-related movements. This includes
PEF and SEF balances which, due to their academic year basis and funding conditions, are
required to be carried forward. This is offset by an apparent recurring saving of £1,925,000;
however, this is largely driven by vacancy savings which are not expected to continue. After
adjusting for these vacancy-related savings, the underlying position reflects significant
demand-led pressures within the service, particularly in relation to Out of Area
placements. 
5.53  The final outturn is broadly in line with the position reported at Quarter 3, with the
underlying financial position continuing to be driven by demand-led pressures despite in-
year mitigating factors.  
Page 125

Page 126

Customer Experience, ICT & Digital Services
5.54  The service reports an underspend of £114,000 at year end against the approved budget. 
5.55   
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000
Staffing   
Vacancy target (374) (559) 185    
Income   
Allocations to HRA (including DLO) (645) (767) 122    
Expenditure   
Central Telephones 52 155 (103)
SWAN 2 broadband transition 965 1,093 (128)    
Residual Variances 5,874 5,836 38
Net Underspend 5,872 5,758 114 
5.56  The overall position reflects staffing savings and increased recharge income, partially
offset by cost pressures within ICT infrastructure and telephony services. 
5.57  Vacancy savings of £185,000 have been achieved, reflecting higher than targeted
vacancies across the service. These savings are non-recurring and relate to temporary in-
year staffing levels. 
5.58  Recharges to the HRA exceeded budget by £122,000. This reflects a combination of higher
allocations for ICT, Contact Centre and Out of Hours services, together with revisions to
how central costs are allocated. This is considered largely recurring, subject to the full
year effect of Out of Hours recharges. 
5.59  The main cost pressures relate to ICT and telephony services. Central Telephones
overspent by £103,000, reflecting both historic cost pressures and the introduction of a
new telephony solution. While some costs relate to one-off implementation, a recurring
pressure remains within the base budget, although this may be partly offset by
corresponding underspends within service budgets. The transition to SWAN 2 broadband
resulted in an overspend of £128,000. This reflects additional dual running costs during
implementation, which were not fully anticipated in the original budget. The approved
funding for the programme is being supported through the Transformation Reserve;
however, the extent to which these additional costs will recur remains under review. 
5.60  Overall, £62,000 of the net position reflects recurring savings, with a further £14,000
relating to non-recurring items, with the overall position benefiting from staffing and
recharge movements offsetting ICT-related pressures.
The final outturn is broadly consistent with the position reported at Q3, with ongoing
pressures within ICT infrastructure partially mitigated by favourable income and staffing
variances.
Page 126

Page 127

People, Change and Community Strategy
5.61  The service reports an overspend of £170,000 at year end against the approved budget. 
5.62   
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000
Staffing   
Redundancy costs 0 57 (57)    
Income   
Allocations to HRA (including DLO)
and External Central Support Services
(57) (65) 8    
Expenditure   
iTrent contract renewal initial
payment
82 168 (86)
Central Training 196 115 81
NI Savings from salary sacrifice (60) (97) 37    
Residual Variances 5,123 5,286 (163)
Net Overspend 5,303 5,473 (170) 
5.63  This reflects a combination of one-off restructure-related costs and ICT system
expenditure pressures, partly offset by savings across training, income and national
insurance. 
5.64  Redundancy costs of £57,000 have been incurred during the year in relation to the
management restructure and represent a non-recurring pressure. 
Income from allocations to the HRA and external services exceeded budget by £8,000.
This reflects higher recharge levels and is considered a small recurring favourable
variance. 
5.65  The iTrent contract renewal resulted in an overspend of £86,000, reflecting one-off initial
implementation costs. While this pressure is non-recurring, it should be noted that a
recurring budget pressure of approximately £24,000 has been identified from 2026/27 for
ongoing support and maintenance. Central Training reported an underspend of £81,000,
continuing a trend of underspend in this area, although this is assumed to be non-
recurring at this stage due to committed expenditure plans. These pressures are partly
offset by increased National Insurance savings from salary sacrifice schemes (£37,000),
which are expected to continue. 
5.66  Overall, £64,000 of the position reflects recurring savings, while £224,000 relates to non-
recurring pressures, primarily associated with restructuring costs and one-off system
implementation. This is the first year of reporting under the revised structure, and while
Page 127

Page 128

budgets have been realigned accordingly, the outturn reflects transitional impacts
associated with the restructure.   
Financial Services
5.67  The service reports an overspend of £342,000 at year end against the approved budget. 
5.68   
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000
Staffing   
Vacancy target (174) (466) 292    
Income   
Sherriff Officer penalty income
recoveries
(358) (418) 60
VAT interest (income from HMRC) - (14) 14
Contract rebates (71) (56) (15)
Truck cartel claim income - (119) 119
Allocations to HRA (including DLO)
and External Central Support Services
(476) (517) 41    
Expenditure   
External Audit fee 319 362 (43)
Banking and card payment fees 111 153 (41)
Taxation postages 50 90 (40)
Taxation – data validation - 36 (36)
NDR reliefs 235 792 (557)
BIDS write off - 32 (32)
Legal expenses – Asbestos case
settlement
- 175 (175)
Legal expenses – SCA inquiry - 56 (56)
Additional Pension costs 1,028 1,037 (9)
Strain on Fund - 144 (144)    
Residual Variances 3,169 2,888 281
Net Overspend 3,833 4,175 (342) 
5.69  The adverse position is driven primarily by Non-Domestic Rates (NDR) reliefs and a
number of one-off legal and operational costs, partially offset by staffing savings and
favourable income movements. 
5.70  Vacancy savings of £292,000 have been achieved across the service, reflecting higher than
targeted vacancies during the year. These savings are non-recurring and relate to in-year
staffing levels. 
Page 128

Page 129

5.71  Income performed favourably overall. Sheriff Officer penalty income exceeded budget by
£60,000, reflecting increased recovery activity. A one-off receipt of £119,000 was
recognised in respect of the Truck Cartel claim. Recharges to the HRA were also higher
than budget, contributing a further £41,000 favourable variance, which is expected to
continue. These favourable movements are partly offset by a reduction in contract rebate
income (£15,000 adverse). 
5.72  The most significant pressure relates to NDR reliefs, which overspent by £557,000,
reflecting increased demand and changes in relief claims. Additional recurring cost
pressures are evident in External Audit fees (£43,000), banking and card payment fees
(£41,000), taxation postages (£40,000), and data validation costs (£36,000), all of which
reflect ongoing operational requirements. A number of one off costs have also been
incurred, including a £175,000 asbestos-related legal settlement, £56,000 relating to the
SCA inquiry, and a £32,000 Business Improvement District (BIDS) write-off. Additional
pension and Strain on the Fund costs have resulted in combined overspends, including
£144,000 of one-off strain costs linked to individual cases. 
5.73  Overall, £133,000 of the position relates to non-recurring items, including one-off income
and legal settlements, while £587,000 reflects recurring pressures, primarily within NDR
reliefs and core operational costs. The final outturn is broadly consistent with the Q3
position, with ongoing demand for NDR reliefs remaining the key pressure within the
service.   
Chief Executive Function
5.74  The Service reports an overspend of £68,000 at year end against the approved budget. 
5.75   
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000
Staffing   
Dual staffing costs overlapping 632 666 (34)    
Expenditure   
Chief Executive recruitment and
Management restructure
34 73 (39)    
Residual Variances (9) (14) 5
Net Overspend 657 725 (68) 
5.76  The position reflects transitional costs associated with the change in Chief Executive and
management restructure throughout the year, partially offset by minor balancing
variances. 
5.77  Dual running costs associated with the transition between Chief Executives resulted in an
overspend of £34,000. These costs are non-recurring and relate to the overlap period
during the year. 
Page 129

Page 130

5.78  Residual variances are minimal and reflect minor timing differences. As this is the first
year following the management restructure, the outturn reflects transitional impacts, with
no ongoing pressures expected to continue into 2026/27.   
Health and Social Care (Moray Integration Joint Board)
5.79  At Q3 the Moray Integration Joint Board  (MIJB) was forecasting an overspend of
£8,233,574, with the Council responsible for 47% of this amount, equating to £3,869,780.
In recognition of the recurring financial pressures within the MIJB, the Council had
included a provision of £3,400,000 within the 2025/26 budget to support its anticipated
share of the overspend. The final outturn position improved from the Q3 forecast, with the
MIJB reporting a reduced overspend of £7,196,896. As a result, the Council’s final
contribution was lower than anticipated at £3,382,541, allowing a small proportion of the
provision to remain unutilised.  The Council’s overall Health and Social Care expenditure
also includes additional in-year pressures, including £650,000 relating to Support Worker
pay regrading. This cost is included within the total Health & Social Care budget for the
year but sits outwith the specific contribution towards the MIJB overspend.   
Loans Charges
5.80  Loans Charges report an underspend of £141,000 at year end against the approved
budget. 
5.81   
Adjusted
Annual
Budget
£000
Actual
Outturn 
£000
Variance
Underspend/
(Overspend)
£000
Loans Principal 10,026 9,761 265
Loans Interest 10,381 11,511 (1,130)
Interest on Revenue Balances (IORB)  (948) (2,221) 1,273
Finance Lease Principal 691 691 -
Finance Lease Interest 4,510 4,510 -
Transfer Interest (IORB) to Capital
reserves
- 267 (267)    
Net Underspend 24,660 24,519 141 
5.82  The overall position reflects offsetting movements between interest payable, principal
repayments and interest on revenue balances, which are most appropriately considered
together as a single financing cost. Interest on revenue balances exceeded budget by
£1,273,000, reflecting higher than anticipated cash balances and interest rates during the
year. This is offset by higher borrowing costs, with interest payments exceeding budget by
£1,130,000. Principal repayments were below budget by £265,000, contributing to the
overall favourable position. Finance lease principal and interest charges have been
transferred in full from service departments at year end and therefore do not give rise to a
variance on the loans charges budget. A transfer of £267,000 of interest to capital reserves
has also been processed during the year, in line with treasury management arrangements.
Taking all elements together, the net position represents a small underspend, with no
significant recurring pressures identified. The position remains sensitive to interest rate
Page 130

Page 131

movements and borrowing activity and will continue to be monitored as part of treasury
management.   
Provisions
5.83  Provisions are held within the budget to support known financial pressures, including
inflation, additional costs and planned savings. These provisions are reviewed and
adjusted throughout the year as part of the quarterly budget monitoring process and are
released to service budgets where pressures materialise. At the start of the financial year,
provisions totalled £6,556,000 for contingencies and inflation, £12,335,000 for additional
costs and (£7,889,000) for planned savings. Through the year, a number of adjustments
were made, including the release of funding to services to support emerging pressures
such as pay awards, demand-led expenditure and service-specific cost pressures. This
resulted in a reduction in the level of provisions held centrally as budgets were realigned to
reflect in-year activity. By year end, the remaining provisions total £173,000 for
contingencies and inflation, £963,000 for additional costs and (£739,000) for savings. The
reduction from the levels held earlier in the year reflects the planned use of provisions to
support service budgets, together with updated assessments of requirements based on
the final outturn position. Overall, the provisions budget reports an underspend of
£397,000 at year end. This reflects a combination of lower than anticipated demand for
some provisions and the impact of revised assumptions applied during the final quarter.
The remaining balances will be reviewed as part of the 2026/27 budget process to ensure
that adequate provision continues to be made for known financial risks.   
General Revenue Grant 
5.84  At the time of setting the 2025/26 budget, total revenue funding (excluding specific grants)
was estimated at £233,439,000. During the year, further funding allocations were
confirmed by the Scottish Government, bringing the final General Revenue Grant to
£237,842,000 (including Non-Domestic Rates), as set out in Finance Circular 2/2026.
Overall, additional funding of £5,388,000 was received and applied to budgets during the
year. The majority of this relates to funding to support national pay awards and the
increase in employer National Insurance contributions, with £2,280,000 allocated for this
purpose. These in-year funding updates have been reflected in the final outturn position
reported above.   
Council Tax Income
5.85  At the time of setting the budget, Council Tax income was projected at £57,470,000. After
accounting for the transfer to the Housing Revenue Account for Council Tax on second
homes, the net income stands at £57,148,000 effectively on the increased target, with  in-
year collection rate of 95.9% (2024/25 95.7%).   
Approved Savings 2025/26
5.86  Savings approved for 2025/26 comprised £6,582,000 of recurring savings, £176,000 of
temporary savings and £344,000 from increases in charges, totalling £7,102,000. Savings
are allocated to service budgets during the year. Where savings are no longer considered
achievable, they are either removed (shown as red) or deferred to future years (shown as
amber). Appendix 3 provides the full detail, with a summary set out in the table below.
Savings achieved total £5,361,000. A further £334,000 has been deferred to future years
(amber), while £1,407,000 has been assessed as unachievable (red).  
Page 131

Page 132

Service Red
Savings
£000
Amber
Savings
£000
Green
Savings
£000
Total
Savings
£000
Economy, Enterprise & Operations 706  146 517 1,369
Education, Housing & Communities 309 47 3,908 4,264
Finance, Strategy & Transformation  72 - 248 320
Cross Service 75 65 226 366
Charges for Services - - 344 344
Transformation 245 76 118 439
Total 1,407 334 5,361 7,102 
Recurring Budget Variances
5.87  As part of the year-end review, services have identified a number of recurring budget
variances which are expected to continue into 2026/27 unless corrective action is taken.
These include both recurring pressures and recurring savings across staffing, income and
expenditure budgets. 
5.88  This initial assessment indicates that a number of demand-led and operational pressures
remain within service budgets, particularly in relation to Out of Area placements, Non-
Domestic Rates reliefs, Winter Maintenance and certain property and waste income
budgets. These are partly offset by recurring savings and over-recoveries in other areas,
including some recharge income and operational budget lines. 
5.89  This is an initial assessment based on the year-end position. The detailed treatment of
individual items will continue to be reviewed with Heads of Service and budget managers
and will be used to inform the 2026/27 budget process and future budget monitoring
reports before any permanent budget adjustments are proposed.   
Reserves
5.90  The Council needs to retain a certain level of free reserves in case of unforeseen
contingencies or emergencies. The balance on free general reserves (ie excluding DSM
and ear-marked reserves) as at 1 April 2025 was £6,000,000. This is the minimum level of
reserves that can be held on free general reserves in terms of the Council’s financial
reserves policy, recently reviewed and approved by Council on 25 September 2024
(paragraph 15 of the minute refers).  
5.91  In addition to the free general reserve, the Council maintains several earmarked reserves 
designated for specific purposes. These include reserves for Transformation, cash flow for
the Moray Growth Deal, and other service-specific areas such as DSM. Due to the timing
of funding allocations and delays in project delivery, some funds may remain unspent,
leading to an accumulation in reserve balances. To ensure these funds are preserved and
managed separately from the Council’s general working reserves, earmarked reserves
allow for the controlled release of funds as expenditures occur, in accordance with
approved plans. 
Page 132

Page 133

5.92  Additional implementation costs have been identified for the SWAN2 project, with final
costs expected to exceed the approved budget of £564,000 by £93,000 due to transition
and overlap costs not fully included in the estimate presented to Council on 25 May 2025
(paragraph 16 of the minute refers). It is recommended that the additional £93,000 is met
from the Transformation Reserve. The project is expected to generate recurring savings of
approximately £120,000 per annum. 
5.93  The table below shows the planned use of reserves in 2025/26; the original budget
approved, the Q3 anticipated use of reserves, compared with the actual use of reserves in
the year. The balance of reserves are shown. A comprehensive list of earmarked reserves
is provided in Appendix 4. 
5.94  In addition, £114,000 of SSEN Community Resilience Project funding held in earmarked
reserves was transferred to capital during the year to support eligible capital expenditure.
This represents a reallocation of funding in line with project requirements and does not
impact on the Council’s underlying General Fund position.     
Budgeted
Use of
Reserves
Q3
Anticipat
ed Use of
Reserves
Actual
Use of
Reserve
2025/26
Opening
Balance
1/4/25
Transfer
In/(Out)
Trans fer
to
Capital
(SSEN)
Closing
Balance
31/3/26 
£000 £000 £000 £000 £000 £000 £000
General - - - 6,000 - - 6,000        
Earmarked       
DSM, PEF, SEF,
ELC Nursery
213 213 58 213 (58) - 155
Transformation 1,292 1,332 1,393 5,892 (1,393) - 4,499
Moray Growth
Deal
- 1,635 451 3,699 (336) - 3,363
Service
Concession
- - - 7,526 - - 7,526
Other
Earmarked
(App 4)
2,177 2,301 2,379 5,954 222 (114) 6,062
Total 3,682 5,481 4,282 29,284 (1,565) (114) 27,604 
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  X
Policy and Legal  X
Financial X 
Risk X 
Page 133

Page 134

Staffing  X
Best Value and Transformation X 
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
6.3  Policy and Legal 
There are no policy or legal implications arising directly from this report.  
6.4  Financial 
The financial implications are noted within the body of the report and in APPENDICES 1-4. 
6.5  Risk 
The outturn position for 2025/26 shows that a number of services are still under financial
pressure, particularly from demand-led costs. While these have been managed during the
year, this has relied on one-off savings, and other underspends that are not expected to
continue. This means there is limited flexibility to deal with unexpected costs or in-year
pressures. As a result, the financial position going into 2026/27 remains tight. Ongoing
action will be needed to bring spending in line with available funding and to maintain
financial stability.  
6.6  Staffing 
There are no staffing implications arising directly from this report.  
6.7  Best Value and Transformation 
There are no best value and transformation implications arising directly from this report.  
6.8  Property 
There are no property implications arising directly from this report.
Page 134

Page 135

6.9  Information Communications/Technology/Digital 
There are no information communication/technology/digital implications arising directly
from this report.  
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities issues arising directly from this report.  
6.11  Climate Change and Biodiversity Impacts 
There are no climate change or biodiversity issues arising directly from this report. 
Achieving the target of net zero will have significant implications for future planned capital
expenditure. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Heads of Service and any comments
made have been incorporated into the report. 
8.  BACKGROUND PAPERS  
8.1  All background papers held by the author within accountancy service.   
Page 135

Page 136

APPENDIX 1 
MORAY COUNCIL - APPENDIX 1
REVENUE MONITORING REPORT
VARIANCE OUTTURN 2025/26
Service
Approved Budget
2025/26
£000s
Actual Outturn
2025/26
£000s
Year to date
variance
£000s
Economy, Enterprise & Operations 38,154 36,066 2,088
Education, Housing & Communities 132,863 132,783 80
Finance, Strategy & Transformation 15,008 15,406 (398)
Chief Executive 657 725 (68)
SERVICES excl HEALTH & SOCIAL CARE 186,682 184,980 1,702
Health & Social Care and Children's Services (MIJB) 90,060 90,060 0
Health & Social Care (Non MIJB) 478 345 133
TOTAL SERVICES incl HEALTH & SOCIAL CARE 277,220 275,385 1,835
Loans Charges 24,660 24,519 141
Provision for Contingencies and Inflation 173 0 173
Additional Costs 963 0 963
Unallocated Savings (739) 0 (739)
TOTAL PROVISIONS 397 0 397
Transfer to Earmarked Reserves 0 2,603 (2,603)
TOTAL GENERAL SERVICES EXPENDITURE 302,277 302,507 (230)
Funding
Scottish Government Grant 241,125 241,191 66
Council Tax 57,470 57,964 494
Less: Council tax on 2nd homes (816) (816)
Use of Reserves
DSM, PEF, ELC Nursery 1,004 1,004 0
Transformation 1,292 1,393 101
Other Earmarked 1,386 1,435 49
Moray Growth Deal 0 336 336
Total Use of Reserves 3,682 4,169 487
Total Funding 302,277 302,507 230
12.62%
43.95%
4.96%
0.22%
29.79%
0.16%
8.16%
0.13%
Budget YTD
% of Total
Economy, Enterprise & Operations Education, Housing & Communities
Finance, Strategy & Transformation Chief Executive
Health & Social Care and Children's Services (MIJB) Health & Social Care (Non MIJB)
Loans Charges Provisions
12.03%
44.28%
5.14%
0.24%
30.03%
0.12%
8.18%
0.00%
Actual YTD
% of Total
Economy, Enterprise & Operations Education, Housing & Communities
Finance, Strategy & Transformation Chief Executive
Health & Social Care and Children's Services (MIJB) Health & Social Care (Non MIJB)
Loans Charges Provisions
Page 136

Page 137

Allocated Budget Provisions for
Contingencies
and Inflation
Additional costs Savings Budget Loan Charges Total Budget
£000s £000s £000s £000s £000s £000s £000s
Reported to Corporate Committee 17 Feb 2026 278,643 (861) 4,783 (1,637) 280,928 19,459 300,387
Funded from Transformation Earmarked Reserve (40) (40) (40)
Funded from Other Earmarked Reserves (124) (124) (124)
Additional GRG 236 1,818 2,054 2,054
Adjustment 1 - Q4 adjustments (172) (1,064) 1,236 0 0
Adjustment 1 - release to departments 3,878 280 (5,056) 898 0 0
Moray Council 30 June 2026 282,421 173 963 (739) 282,818 19,459 302,277
Page 137

Page 138

APPENDIX 3 
SAVINGS STATUS 2025/26
Red
Savings
£000
Amber
Savings
£000
Green
Savings
£000
Total
£000 Reason for red saving
ECONOMY, ENTERPRISE & OPERATIONS
Growth, Planning & Climate
CCTV 10 10
E2-5 Planning - new charge 25 25
E9-2 Admin - Restructure 33 33
Econ Dev & Growth misc 3 3
Environmental Health (Appendix 5 item 10) 38 38
Recharge Money Advice to HRA 110 110
Saving from DAR2692 Senior Planning officer 14 14
Statutory fees for planning applications 40 40
Operations & Environment
D11-2  Local supplier framework (Consultancy) 13 13
D11-3 FRA and DIA - charges (Consultancy) 30 30
D4-13 close Dallachy HWRC 10 10
D6-8 Open Spaces - Full cost recovery from HRA of inspection/main of play areas 10 18 28 £10k to be retained for potential equipment/staffing cost in Open Spaces. 
D7-4 Roads - Gully cleaning 20 30 50
D7-5 Roads - Street Lighting 8 42 50 Maximum budget was taken
Dallachy - closure 660 660 The saving has not been achieved in 2025/26. Work is underway to review the underlying cost base of
current operating arrangements. Emerging underspends are being assessed to determine a realistic
and sustainable level of saving that can be achieved.
Fleet - Lease Specialist Vehicles 76 76
Fleet restructure DAR 24 24
Roads maintenance - hire out machinery 50 50
Waste Management - Reduce HWRC opening hours (close 1 weekday) 28 22 50 The original saving assumed the closure of a number of sites; however, the scope of the proposal was
subsequently reduced and the full saving has not been achieved.
Governance
Registrars income 5 5
Page 138

Page 139

APPENDIX 3 
Red
Savings
£000
Amber
Savings
£000
Green
Savings
£000
Total
£000 Reason for red saving
EDUCATION, HOUSING & COMMUNITIES
Leisure & Culture
Library contract management systems 7 7
Remove Mobile Library Unit 35 35
Housing, Property & Communities
C1-C5/1 Building Services - Depot Rental 112 112
C1-C5/1 Building Services/Property Services Corporate Repairs 10 10
C3-7  Moray Women's Aid Option 1 - reduce funding by 20% 26 26
C4-1 Housing Improvement Grants 70 70
Elgin Community Centre closure - VER 40 33 73
Guildry House 7 17 24
Property - Close two corporate offices 51 51
Property - Take a more commercial approach to rent reviews 65 65
Temporary Accommodation increased charges 42 42
Unit H Depot & Stores review 10 10
Benefits Team charges to the Accountant in Bankruptcy 10 10
GSP - internal mail 10 10
Money Advice 29 29 Saving taken in full in 24/25.
Performance monitoring 16 16 Saving taken in full in 24/25.
Welfare Benefits & Money Advice - Co-locate Citizen's Advice Bureau 20 20 Saving did not materialise in 25/26.
Learning Estate review of operational budget 15 15
Education & Out of Area
A1-10 ELC Remove year round provision 2 2 Small balance of a £245k saving in 25/26
A1-12 ELC Teachers to QIO 127 127
A1-7  partner nurseries in-service days 111 111
A1-8 ELC Vacant ESO post 34 34
A18-3  ASN music (Change Budget holder for Music) 5 5
A18-4  AQA accreditation 4 4
A1-9 ELC Remove year round provision 243 243
A2_A3-4  DSM 200 One off saving taken in 2024/25
A20-6 Central education budget (one off savings from budget used to support
schools) 50 50
Central Education - Remove 1QIM 29 29
Central travel budget 10 10
Education - EAL team 38 38
Education - SES team 50 50
Educational Psychology 70 70
ELC - Reduce Early Years teaching team by 2 posts 49 49
ELC - Remove Early Years Principal Teacher post 50 50
ELC CMP - NM's wks & 36.25-35hrs saving 1 1
ELC CMP - YR to TT savings 24/25 152 152Page 139

Page 140

APPENDIX 3 
Red
Savings
£000
Amber
Savings
£000
Green
Savings
£000
Total
£000 Reason for red saving
ELC Rental Income 18 18
Grant income reduction for ELC milk/healthy snack fund 6 6
Learning Technologist 15 15
Primary - Pupil teacher ration move to statutory requirement 42 25 67 Dependent on school roll numbers
Capitalise PPP Lifecycle Costs 850 850
Secondary Schools - Reduce DSM 116 116
Service concession 1262 1262
FINANCE, STRATEGY & TRANSFORMATION
People, Change & Community Strategy
F3-3 Customer Services - mail van frequency 10 10 Duplicate saving. Additional savings may be achievable and will be included in future proposals.
F4-9 HR No compulsory redundancy 45 45
HR misc savings 3 3
A6-5 Community Support - Youth Workers 62 62
This relates to budget provision for 2024/25 that was not drawn down, and therefore the associated
saving could not be realised.
A6-9 Community Support - Community Capacity 4 4
Financial Services
Contract Rebates 10 10
F6-14  Increase CTX collection rate 106 106
F6-15 Accountancy - Principal Accountant post 32 32
CROSS SERVICE
EV / ULE salary sacrifice 20 20
Increase vacancy factor in line with pay awards - updated to 4% in line with 25/26
SJC agreement 180 180
HR ICT contracts 75 16 91
A significant proportion of the proposed savings relate to ring-fenced budgets, including IJB and HRA,
which limits the Council’s ability to realise them.
Spend to Save - LED Lighting and Solar PV Project 45 30 75
Temporary Savings
Capitalise salary for Project Officer 80 80
Grampian Valuation Joint Board - refund of surplus 48 48
LHEES saving 23/24 50 50
Transformation
Care Placements - to be removed 245 245 The saving relates to Children’s Services but falls within the remit of the MIJB and therefore cannot be
LEAN review 8 8
Out of Hours Review 118 118
Smarter Working (Ph 2 & 3) 68 68
Charges for Services 344 344
TOTAL 1407 334 5361 7102 Page 140

Page 141

APPENDIX 4 
OTHER EARMARKED RESERVES 2025/26 
• SSEN Community Resilience Project funding of £114,000 was transferred to
capital in the year to fund expenditure.
Opening
Balance
Transfers
In
Transfers
(Out)
Closing
Balance
£000 £000 £000 £000
Education Attainment Fund (SEF/PEF/Care Experienced Fund) 1,020 2,291 (2,250) 1,061
ELC Snack/Fundraising Accounts 25 0 0 25
Refugee Resettlement 2,224 870 (736) 2,358
Youth Work Communities Grants 34 0 (7) 27
Whole Family Wellbeing Fund 1,001 619 (711) 909
DLUHC - Elections Act 2022 4 0 (4) 0
Scottish Welfare Fund 296 0 (86) 210
Sanquhar Loch 44 0 (6) 38
Welfare reform 13 0 (13) 0
Dornell Windfarm 66 0 (20) 46
Employability YPG 81 0 (49) 32
Employability Child Poverty 97 0 (26) 71
Long Term Town Plan/Elgin Neighbourhood Board 190 272 (109) 353
Levelling Up Capacity Funding 86 0 0 86
Adult Protection 18 0 0 18
SSEN Community Resilience Project * 178 0 (114) 64
HIE Procurement Funding 35 0 (35) 0
Place Based Investment Fund 200 0 0 200
Coastal Communities Fund 23-26 257 171 (84) 344
Community Planning Partnership 53 10 0 63
Scotland Loves Local Moray 32 0 (14) 18
Fairer Futures Adopt & Adapt 0 70 0 70
Nature Restoration Fund 0 69 0 69
Total 5,954 4,372 (4,264) 6,062
Page 141

Page 142

Page 142

Page 143

Report to:  Moray Council Meeting Date: 30 June 2026   
Report by: Chief Executive 
Author: Lesley Rash Contact Email: lesley.rash@moray.gov.uk 
Subject: Capital Monitoring to 31 March 2026 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform the Committee of the expenditure to 31 March 2026
under the Capital Plan for financial year 2025/26 and to recommend budget adjustments
for inclusion in the Capital Plan for 2026/27 and future years.  
1.2  This report is submitted to Council in terms of Section III (B) five of the Council's Scheme
of Administration relating to monitoring progress of projects in the approved Capital Plan
including any revisions to the price or phasing on a quarterly basis. 
2.  SUMMARY  
2.1  The Capital Plan for 2025/26, totalling £64,045,000, was originally approved by Moray
Council on 21 January 2025 (paragraph 7 of the minutes refers).  Through a number of
Council approvals during the 2025/26 financial year, the revised Capital Plan was
£50,564,000. 
2.2 Capital spends to the year end 31 March 2026 were £32,596,000 against the amended
Capital Plan of £50,564,000, representing a delivery of 65%. Further detail is set out in
APPENDIX 1, including carry forward requests. 
2.3 Quarterly reporting for 2025/26 includes emphasis on the delivery of the capital plan, with
greater focus on quarterly spend and scrutiny of slippage.  The Q4 report provides further
evaluation of capital slippage for 2025/26 including suggested mitigating actions going
forward. 
2.4 The Capital Plan approved by Council on 28 January 2026 (paragraph 2 of the minute
refers) included an indicative value for General Capital Grant for 2026/27. An amended
Item 9.
Page 143

Page 144

Capital Plan for 2026/27 is presented following formal confirmation of the funding
settlement and other funding allocations for the same period. 
3.  RECOMMENDATIONS 
3.1  It is recommended that the Council:   
i)  Considers and notes full year expenditure to 31 March 2026 of £32,596,000
against an approved amended budget of £50,564,000   as set out in APPENDIX
1; 
ii)  Approves the final carry forwards and amendments to 2026/27 and future
years totalling an increase of £18,247,000; 
iii)  Approves further amendments to the Capital Plan for 2026/27 following
confirmation of the Scottish Government funding settlement and other
funding allocations for the same period, resulting in an amended Capital Plan
for 2026/27 of £77,294,000; and 
iv)  Considers and notes the update to the Garmouth Viaduct span removal
project as noted in Section 10.   
Lesley Rash
Accountant 
4.  BACKGROUND AND CONTEXT  
4.1  The Capital Plan for 2025/26 totalling £64,045,000 was approved by Moray Council
on 21 January 2025 (paragraph 7 of the minutes refers).  The Council approved
amendments to the Capital Plan on 19 February 2025 (paragraph 12 of the minute
refers) and 25 June 2025 (paragraph 8 of the draft minute refers) of which £9,493,000
was to be distributed to 2025/26. Corporate Committee on 26 August 2025
(paragraph 5 of the minute refers) agreed a carry forward of £25,226,000 from
2025/26 to 2026/27 and an adjustment of £2,946,000, in 2025/26. Further
amendments of £694,000 were approved at Council on 3 December 2025
(paragraph 13 of the draft minute refers). The result of these amendments is an
amended Capital Plan for 2025/26 of £50,564,000.  
5 CAPITAL PLAN  
5.1 A copy of the Capital Plan is included as APPENDIX 1 detailing expenditure of
£32,596,000 to 31 March 2026. Capital spend has been funded by General Capital
Grant (£10,591,000); Moray Growth Deal (£5,421,000); Levelling Up Fund
(£2,478,000); other capital grants and receipts (£2,199,000); and the balance being
Prudential borrowing (£11,907,000). APPENDIX 2 provides detail on major capital
projects spanning more than 1 financial year. 
Page 144

Page 145

A summary of the variances and recommended carry forwards are shown below. 
Asset Area Para ref
Total
Under
Spend
Capital
Received
this
Quarter
Total
Carry
Forward
Total
Out
turn
Position
Fleet and Plant 5.2 351  - 349 2
Waste Management 5.3 449  - 449 -
Property Estates
Management 5.4 893   893 -
Roads, Bridges and
Lighting 5.5 419  68 422 65
Open Spaces 5.6 1,009  - 1,000 9
Flood Risk Management
and Coastal Protection 5.7           140 320  409 51
Harbours 5.8 87   65 22
Libraries and Leisure 5.9 745 21 762 4
ICT 5.1 107  - 107 -
Learning Estate’s 5.11 5,041  - 5,041 -
Moray Growth Deal 5.12 5,434  - 5,434 -
Levelling Up Fund 5.13 2,639  - 2,639 -
Funded Spend 5.14 654 31 677 8
TOTAL   17,968 440 18,247 161 
5.2 Fleet and Plant  Expenditure to
31/03/2026
(£000)
Budget 2025/26
(£000)
% achieved
2,060 2,411 85% 
Spend for the year was £2,060,000 against a budget of £2,411,000, resulting in an
underspend of £351,000. Fleet Services uses a ten-year vehicle and plant
replacement programme to ensure assets are replaced at the optimum age. The
underspend was due to manufacturing delays on a number of vehicles. It is
recommended £349,000 is carried forward. 
5.3 Waste
Management
Expenditure to
31/03/2026
(£000)
Budget 2025/26
(£000)
% achieved
1,206 1,655 73% 
Spend for the year was £1,206,000 against a budget of £1,655,000, resulting in an
underspend of £449,000. Dallachy Landfill Site was underspent due to the final
account for the capping works not yet being agreed, with consultants continuing to
engage with the contractor regarding outstanding compensation events. It is
Page 145

Page 146

recommended the underspend of £303,000 is carried forward. There was an
underspend on Domestic and Trade Waste Bins due to ongoing storage constraints,
it is recommended the £36,000 underspend is carried forward to ensure demand
can continue to be met. The NESS project was underspent due to on-site
challenges, including equipment changes and some uncertainty regarding the final
specification. It is recommended the underspend of £110,000 is carried forward
until the end of the project.  
5.4 Property Estate
Management
Expenditure to
31/03/2026
(£000)
Budget 2025/26
(£000)
% achieved
745 1,638 45% 
Spend for the year was £745,000 against a budget of £1,638,000, resulting in an
underspend of £893,000. Industrial Units were underspent by £90,000 due to
staffing vacancies, with only essential statutory compliance works completed
during the year. It is recommended £90,000 is carried forward to continue the work
in 2026/27. Legionella and Fire Risk upgrades were underspent due to changing the
procurement method which delayed the quotes being received. It is recommended
£21,000 is carried forward to complete the works.  The Salt Shed at Keith (spend to
save project) was also delayed due to a change in procurement method which
caused delays in tendering and the project will not commence until 2026/27. It is
recommended £345,000 is carried forward to complete the project in 2026/27. It is
recommended that the £74,000 underspend for SSEN resilience funding is returned
to earmarked reserves until further development of spend plans. Finally, it is
recommended to carry forward £363,000 to 2029/30 for Solar, Heating and Energy
Efficiency works. This project will be deferred to allow priority to be given to
progressing an external funding bid to the Just Transition Fund. The capital funding
set aside for climate change actions may be used to support this, depending on the
outcome of the funding bid. 
5.5 Roads, Bridges and
Street Lighting
Expenditure to
31/03/2026
(£000)
Budget 2025/26
(£000)
% achieved
5.796 6,215 93% 
Spend for the year was £5,796,000 against a budget of £6,215,000, resulting in an
underspend of £419,000. A road safety grant was received during the year which
increased the underspend to £487,000. It is recommended £257,000 is carried
forward to meet costs associated with remedial works required at Lossiemouth
Cemetery, £37,000 is carried forward for data collection equipment and £35,000 is
carried forward for traffic signal replacement. The Active Travel Infrastructure Fund
forms part of a multi-year grant from the Scottish Government and will be used as a
contribution towards Levelling Up Fund Active Travel projects. It is therefore
recommended that the remaining budget of approximately £93,000 be carried
forward to allow the contribution to be made in 2026/27.
Page 146

Page 147

The Spey Viaduct partially collapsed in December 2025, creating an urgent
requirement for the Council to remove the fallen spans to address safety concerns
and enable a full investigation, the additional costs in 2025/26 were funded from
existing project underspends. The removal of the collapsed sections is estimated to
cost approximately £500,000, with a further £38,000 required to complete
investigative works following Transport Scotland’s contribution. 
5.6 Open Spaces Expenditure to
31/03/2026 
(£000)
Budget 2025/26 
(£000)
% achieved
3,204 4,213 76% 
Spend for the year was £3,204,000 against a budget of £4,213,000, resulting in an
underspend of £1,009,000. Elgin Cemetery was underspent by £727,000; the project
will be completed in early 2026/27, and it is recommended the full amount is carried
forward. Any remaining budget not required will be reallocated to projects that were
previously reduced to support this work. Children’s Play Areas were underspent by
£273,000. These funds are committed to renewal projects that have been procured
within the financial year, but completion has been delayed until May 2026 due to
participatory budgeting requirements, supplier delays, and ground conditions. It is
recommended the full underspend is carried forward. 
5.7 Flood Risk
Management and
Coastal Protection
Expenditure to
31/03/2026 
(£000)
Budget 2025/26
(£000)
% achieved
219 359 61% 
Spend for the year was £219,000 against a budget of £359,000, resulting in an
underspend of £140,000. An additional £320,000 grant for the Rothes Fish Pass
Project was received from the Water Environment Fund in March 2026, and it is
recommended that this amount be carried forward. It is also recommended that
£16,000 be carried forward for coastal adaptation works to allow completion in early
April. The Anti-Tank Assessment project was underspent due to adverse weather
affecting survey work and difficulties in securing suitably experienced engineering
expertise to assess the impact of anti-tank defences on the coastline. It is
recommended that the remaining £33,000 grant balance for this project be carried
forward, as contracts are already in place. In addition, it is recommended that
£40,000 be carried forward for Cullen Seawall, where work was delayed due to staff
vacancies and limited resources. 
5.8  Harbours Expenditure to
31/03/2026
(£000)
Budget 2025/26
(£000)
% achieved
660 747 88% 
Page 147

Page 148

Spend for the year was £660,000 against a budget of £747,000, resulting in an
underspend of £87,000. It is recommended that £65,000 is carried forward, £19,000
will be required to complete Pier1 Joint works which will be completed early April,
£15,000 will be required to complete the Pontoons and £31,000 to complete West
Cullen Pier. All works were delayed due to weather conditions and contractual
issues due to larger than anticipated waves. 
5.9 Libraries and
Leisure
Expenditure to
31/03/2026
(£000)
Budget 2025/26
(£000)
% achieved
619 1,364 45% 
Spend for the year was £619,000 against a budget of £1,364,000, resulting in an
underspend of £745,000. A historic bequest totalling £21,000, which was not
originally included in the 2025/26 capital plan, has now been fully spent. For the
resurface and rejuvenate 3G pitches in Moray project, an underspend of £79,000 has
arisen as the 3G pitch at Milnes is not full-sized, resulting in a lower resurfacing cost
than anticipated. It is recommended that this underspend be carried forward to
2028/29 to help offset increased costs in the next phase of the 3G refurbishment
programme and to support the potential use of more sustainable, non-plastic infill
materials. In relation to refurbishment and upgrade of pools, an underspend of
£269,000 is recommended for carry forward to 2026/27 to allow design and
commissioning of prioritised refurbishment work packages. 
Progress has been delayed due to estate rationalisation and service uncertainty;
however, condition surveys are now complete. This design phase is essential to
enable delivery of the planned refurbishment programmes in 2027/28, and specialist
expertise will require to be commissioned externally. For libraries refurbishment, an
underspend of £113,000 is recommended for carry forward to 2026/27 to support
targeted improvement works. Progress has been limited due to service uncertainty
linked to proposed closures and savings initiatives, with the future operating model
only approved in December 2025. Carry forward funding will enable improvements
aligned with this approved model and informed by feedback from library user groups.
For Moray Leisure Centre, an underspend of £301,000 is recommended for carry
forward to 2026/27 to enable the completion of the critical works programme that is
currently ongoing.  Due to the complexity of the systems within the facility the critical
works have required a phasing of implementation which has extended the works
programme into 2026/27.  The majority of the critical works will be completed as part
of a facility closure in quarter 1 of 2026/27.  
5.10 ICT Expenditure to
31/03/2026
(£000)
Budget 2025/26
(£000)
% achieved
419 526 80% 
Spend for the year was £419,000 against a budget of £526,000, resulting in an
underspend of £107,000. It is recommended that £107,000 is carried forward,
Page 148

Page 149

comprising £21,000 for the final payment on completion of the Exchange
Communications Project, £26,000 for the final stage of works with BT where orders
were placed at the end of March and £2,000 for interactive panel installation services
at Alves Primary School. The remaining balance of £58,000 is recommended for carry
forward to support essential upgrades to Call Recording, Leisure Management,
Planning and Building Standards and Job Scheduling systems, as well as a committed
element of the Council website redesign project.  
5.11 Learning Estate Expenditure to
31/03/2026
(£000)
Budget 2025/26
(£000)
% achieved
9,610 14,651 66% 
Spend for the year was £9,610,000 against a budget of £14,651,000, resulting in an
underspend of £5,041,000. This was mainly due to the Cullen Primary School upgrade
being reprofiled into 2026/27, the Alves Primary fabric upgrade being retendered to
secure best value and maximise market interest, the late start to Mortlach Primary
refurbishment, and the Elgin High School capacity extension being reduced from a
new build extension to the repurposing of existing space. It is recommended that the
full underspend be carried forward. This reflects the nature of the school capital
programme, which operates on a rolling ten-year basis. Funding profiles and delivery
timescales continually change, particularly where works must be completed during
school holiday periods, resulting in slippage across financial years. 
5.12 Moray Growth Deal  Expenditure to
31/03/2026 
(£000)
Budget 2025/26
(£000)
% achieved
5,421 10,855 50% 
Spend for the year was £5,421,000 against a budget of £10,855,000, resulting in an
underspend of £5,434,000. The Cultural Quarter was underspent due to delays in the
tender process for Elgin Town Hall and the pausing of Grant Lodge to enable the team
to focus on external fundraising.  The underspend on Housing Mix Delivery was due to
delays in the planning process for South Street and Dallas Dhu. The full underspend is
recommended for carry forward, reflecting the continued delivery of multi-year
Growth Deal projects.   
5.13 Levelling Up Fund Expenditure to
31/03/2026 
(£000)
Budget 2025/26 
(£000)
% achieved
2,478 5,117 43% 
Spend for the year was £2,478,000 against a budget of £5,117,000, resulting in an
underspend of £2,639,000. It is recommended that the full underspend be carried
forward to 2027/28, as this is a fully funded scheme. The Traffic Bollards project is
now progressing independently following the pause of the Moss Street scheme,
where Traffic Regulation Order approval had originally been linked. The Gordon Arms
Page 149

Page 150

Hotel asset transfer has been delayed due to legal issues, deferring planned
expenditure beyond 2025. South Street, which is fully LUF-funded, has resumed
following the appointment of a new delivery partner after the original housing
partner withdrew. The Sawmill Project experienced a short delay while approvals
were secured to align it with the Auction Mart Flood Scheme, but it is now back on
programme. Projects at Railway Bridge and Moss Street Active Travel are no longer
progressing due to poor value for money, design constraints, and stakeholder
objections. Cooper Park was delayed due to affordability concerns but has since
improved following redesign.  
5.14 Funded Spend Expenditure to
31/03/2026
(£000)
Budget 2025/26
(£000)
% achieved
159 813 20% 
Spend for the year was £159,000 against a budget of £813,000, resulting in an
underspend of £654,000. There was a late capital receipt for Forres Restoration and
Heritage Fund of £31,000, the grant was underspent by £2,000, it is recommended
this is carried forward. It is recommended that the £304,000 funding for Forres Town
Centre is carried forward.  The Place-Based Investment funding can be used flexibly
across a five-year programme period; it is recommended the £202,000 is carried
forward. The Nature Restoration Fund underspend of £169,000 is recommended to
be carried forward. The 2025/26 grant allocation was higher than anticipated,
effectively reflecting two years of funding being received in one year. Capacity
constraints limited the ability to co-ordinate expenditure, particularly as funding is
now directed towards a greater number of smaller delivery projects rather than
earlier consultant-led plan development. Increased engagement with communities
and schools has also required more intensive resource input, contributing to project
slippage. 
6 Capital Plan 2026/27  
6.1 The 3-year Capital Plan for 2026-29 was approved by Council on 28 January 2026
(paragraph 2 of the minute refers).  Given timing of the Scottish Government budget
process an indicative funding figure for General Capital Grant was included with a
recommendation to report back to this Committee to approve any amendments. 
6.2 Following formal notification of the budget settlement for 2026/27 there has been a
material change in the General Capital Grant. An additional £998,000 has been
awarded to Moray Council. At the same meeting on 28 January 2026, Moray Council
also agreed to fund up to £538,000 towards Garmouth Viaduct span removal and
investigation (paragraph 9 of the meeting refers). It is recommended that £538,000
is allocated from the additional capital grant. It is also recommended that the
remaining £460,000 is set aside for emerging priorities to be allocated following
subsequent Council approval. Should monies not be required in the year, they will
be used to offset borrowing costs. 
Page 150

Page 151

6.3 Further redeterminations of Scottish Government capital funding have been
announced since previously reported. A total of £1,960,000 has been awarded for
directed initiatives. This includes Flooding (£925,000) Active Travel Infrastructure
Fund (£530,000), Climate Emergency (£390,000), and Nature Restoration Fund
(£115,000). Confirmation of funding for the Bus Infrastructure Fund is still pending;
however, this has prudently been estimated at £500,000 for 2026/27. It is
recommended these amounts are recognised as funding in the Capital Plan with
corresponding expenditure against the relevant asset classes for all except
Flooding, which is recommended to be allocated at £600,000 for 2026/27 and the
remainder in future years. A further report to ED&I is scheduled for 8 September
2026 outlining the spending proposals, which will be aligned to the delivery of
approved flood risk management plans. 
6.4 The spend profile for the Moray Growth Deal programme has been amended
following recently approved change management plans. An amendment to the plan
to reflect the position of all projects as at 1 April 2026 is recommended, resulting in
a reduction of planned spend in 2026/27 of £1,494,000.  Scottish Government have
also indicated their grant offer settlement for 2026/27 to be higher than the
originally tri-partite agreement meaning an additional £3,539,000 will be released to
match spend. 
6.5 It is recommended that £8,151,000 of carry forward from 2025/26 is allocated to
2026/27 with the remainder allocated to future years. The cumulative effect of
these amendments results in an amended capital plan for 2026/27 of £77,294,000.
See Appendix 3. 
7 Affordability Indicator 
7.1 The affordability indicator as of 31 March 2026 and indicative calculator for 2026/27
and 2027/28 are presented below: 
Ratio of Financing Costs to Net
Revenue Budget
2025/26 2026/27 2027/28 
£000 £000 £000
Financing Costs 26,831 26,117 28,696
Net Revenue Budget 299,155 310,628 316,263 
Affordability Indicator (Internal) 7.23% 6.70% 7.40%
Affordability Indicator
(External)
8.97% 8.41% 9.07% 
7.2  The final 2025/26 indicator has seen a minor shift downwards to 7.23% (Q3 7.24%)
as a result of lower actual finance costs offset partly by increased revenue. 
7.3 From 1 April 2025, costs related to leases are excluded from the figure reported to
committee but will form part of any external reporting where the treatment needs to
be recognised. This ensures that only decisions on the capital plan by committee
Page 151

Page 152

are reflected in the affordability indicator. An internal and external figure is
presented. Accounting for leasing costs the affordability indicator is within the set
threshold of 10% for all three years. 
7.4 The 10-year indicative plan for 2026-36 indicated a breach of the affordability
indicator in 2031/32. As such, spend was capped in a phased approach to maintain
affordability limits. Whilst the immediate reduction in indicator would suggest
additional capacity to spend in the short term, a longer-term approach is required
given the nature of debt financing. A review of the Council long-term financial
borrowing affordability, aligned with the next revision of the 10-year plan is
scheduled from Q3 2026/27. 
2026/2027 2027/28 2028/29 2029/30 2030/31 2031/32
Original 9.27% 9.18% 9.45% 9.91% 9.16% 10.00%
Revised 8.41% 9.07% 9.41% 9.88% 9.13% 9.97% 
8 CAPITAL PLAN SLIPPAGE – CAUSATION 
8.1 In total, £45,128,000 of the approved Capital Plan for 2025/26 has been recommended for
carry forward into future years. An exercise was conducted to evaluate the causes of
slippage within 2025/26 with the most common noted below. Project slippage is usually
not caused by a single factor, but usually as a combination of various factors.   
8.2 Scope Change – A number of key projects had scope change in the year. This includes the
Levelling Up Fund, Moray Growth Deal, Learning Estate (Elgin High School), Leisure &
Libraries. Scope change can be caused by various factors including feasibility, often as a
result of affordability, demographic changes, or even strategic direction. 
8.3 Staffing capacity/resilience – Project teams are often small with limited resources. In
instances where a key member of the team leaves there is a notable impact on the pace of
delivery, with momentum often lost. Similarly, capacity within supporting services can
create bottlenecks, particularly if numerous projects are reliant on that support. The
council faces challenges in recruiting and retaining staff in these roles and as such the
resilience within teams is often minimal. 
8.4 Supply chain issues - A few projects were impacted by supply chain issues. This was the
case for both fleet vehicles and ICT infrastructure works planned for the year. Procuring
specialist services also posed a challenge due to the geography of Moray. 
8.5 Third Party Involvement – Increasingly, Moray Council is working in collaboration with
third parties, via partnership agreements, to deliver capital projects. Managing the pace of
delivery across partner projects can be challenging, particularly where control is shared. It
is recognised that external factors, often out with the Council’s direct influence, can
impact progress. This risk is heightened where key delivery partners withdraw from
projects. Evidence of this can be seen across a number of the economic regeneration
projects. 
Page 152

Page 153

8.6 Other external factors – Prolonged legal process impacted a small number of projects,
most notably the Forres Academy project. 
9 CAPITAL PLAN SLIPPAGE – MITIGATION 
9.1 The quarterly monitoring report for the Capital Plan was amended to provide greater focus
on the deliverability of the plan with a targeted delivery threshold of 90%. Whilst this
allows for greater scrutiny it should not be the only approach to increasing delivery. The
following recommendations / best practices are continually being shared with capital
Budget Managers to support them. 
9.2 Project reserves – The change from a single year capital plan to a three-year approved
plan was designed to create flexibility and provide a level of certainty over future funding -
encouraging project delivery over multiple financial years and setting realistic timelines.
Very few projects within the 2025/26 plan were noted to cross multiple years suggesting
managers still maintain a single year mentality. Managers will continue to be reminded
that they should be taking advantage of this flexibility and, if appropriate, holding projects
‘in reserve’ to compensate for any slippage. In reserve projects should still align with
agreed asset management plans and prioritisation methodologies. 
9.3 Improved capital monitoring tools – New budget monitoring tools are available for
budget managers. This aligns closer to the current revenue model providing greater
forecasting ability and detail. 
9.4 Agency/Outsourcing – In some circumstances, the use of agency or outsourced resource
should be considered, particularly where critical roles are difficult to recruit. Although this
will likely increase delivery costs, it may be justified when weighed against the risk of
failure to deliver. 
9.5 Be shelf ready – Similar to project reserves which align to asset management plans,
budget managers will continue be encouraged to have ‘shelf ready’ projects to take
advantage of emerging external funding streams. Whilst more challenging, having projects
which have been designated as feasible allows the council to bid for emerging funding,
and potential increases the likelihood of being awarded over competing underdeveloped
bids. 
10 GARMOUTH VIADUCT UPDATE 
10.1 On 28 January 2026 members agreed to fund the works required to remove the collapsed
sections of Garmouth Viaduct from the River Spey, at an estimated cost of £500,000 (para
9 of the minute refers).  Member also agreed that the Chief Financial Officer and the Head
of Operations and Environment be given delegated powers to award a contract for the
works, subject to the Chief Financial Officer confirming actual costs are within reasonable
proximity to estimated costs. 
10.2 The contract was awarded through the Council’s Small Works Framework, which has an
upper limit of £500,000 for this type of work.  The contract was split into two stages.  The
Page 153

Page 154

first stage was development of a methodology and more accurate cost estimate to
undertake the works.  The second stage was removal of the collapsed sections from the
River.  It was made clear in the contract that the contract could be terminated on
completion of stage one. 
10.3 Stage One, including the method statement, programme and cost estimate have been
completed, and the costs are more than the original estimate of £500,000.  Much of the
additional cost is aligned to project risk and as such challenging to quantify. 
10.4 As the lowest estimated cost exceeds the threshold for the framework, it will be necessary
to tender Stage Two of the works, using the information gathered in Stage One.  The tender
process is likely to take 8 weeks and can be progressed over the summer months. 
10.5 Following completion of the tender exercise a report will be presented to Council
requesting additional funds to progress Stage Two and award a contract. The timing of the
report shall be dependent on the programme of works submitted by the preferred bidder. If
the programme can be completed within the calendar year a special meeting will be
requested for early September 2026. Should the programme be scheduled for completion
in Spring 2027 the report will be presented to Council on 30 September 2026.   
11 SUMMARY OF IMPLICATIONS  
11.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  X
Financial X 
Risk X 
Staffing  X
Best Value and Transformation X 
Property X 
Information Communications Technology/Digital X           
Equalities. Social Inclusion and Economic Impact  X 
Climate Change and Biodiversity Impact X 
11.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
Page 154

Page 155

☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
11.3 Policy and Legal 
There are no policy or legal implications arising directly from this report.  
11.4 Financial 
The financial implications are noted within the body of the report and in APPENDIX 1,
APPENDIX 2 and APPENDIX 3. 
11.5 Risk 
Capital project slippage exposes the Council to escalating costs through inflation,
additional project management requirements, and sustained maintenance pressures.
Persistent slippage can also reduce public confidence in the Council’s ability to deliver
essential public works. 
11.6 Staffing 
There are no staffing implications arising directly from this report.  
11.7 Best Value and Transformation 
The capital plan projects enable the Council to deliver elements of the its Best Value and
Transformation programme. 
11.8 Property 
Specific capital projects directly relate to the Council’s property assets. 
11.9 Information Communications/Technology/Digital 
Specific capital projects directly relate to the Council’s ICT assets. 
11.10 Equalities, Social Inclusion and Economic Impact 
The capital plan projects enable the Council to positively deliver against various
elements of its Equalities, Social Inclusion and Economic Impact improvement goals. 
11.11 Climate Change and Biodiversity Impacts
The capital plan projects enable the Council to positively deliver against various
elements of its Climate Change and Biodiversity Impacts improvement goals. 
12 CONSULTATION  
Page 155

Page 156

12.1 This report has been prepared in consultation with capital budget managers and all
Heads of Service and any comments made have been incorporated into the report 
13. BACKGROUND PAPERS  
13.1 All background papers held by the author within accountancy service. 
Page 156

Page 157

APPENDIX 1 
Moray Council Capital Programme 2025/26      
As at 31st March 2026       
Current
Capital
Plan
2025/2026
Actual
Expenditure
Capital
Received 
Actual
(Over)/Under
Spend
Carry
Forward
Requests
Final Out
Turn
Position
Capital Plans  £000    
Fleet and Plant 2,411 2,060   351 349 2 
Waste Management 1,655 1,206   449 449 0 
Property Estate Management 1,638 745   893 893 0
Roads, Bridges and Street Lighting 6,215 5,796  68  487 422 65 
Open Spaces 4,213 3,204   1,009 1000 9 
Flood Risk Management and Coastal Protection 359 219  320  460 409 51 
Harbours 747 660   87 65 22 
Libraries and Leisure 1,364 619  21  766 762 4 
ICT 526 419   107 107 0 
Learning Estate 14,651 9,610   5,041 5041 0 
Moray Growth Deal 10,855 5,421   5,434 5434 0 
Levelling Up Fund  5,117 2,478   2,639 2,639 0 
Funded Spend 813 159  31  685 677  8 
50,564 32,596 440 18,408 18,247 161         
Funding      
Prudential Borrowing 24,373 11,907     
General Capital Grant (exc PSHG and CYPA) 9,088 10,591     
Moray Growth Deal 10,855 5,421     
Levelling Up Fund/Town Centre Board 5,117 2,478     
Other Grants & Contributions 0 1,816     
Developers Contributions 1,031 0     
Receipts generated in year 100 383     
50,564 32,596     
Page 157

Page 158

Page 158

Page 159

Moray Council Capital Programme 2026/27
As at 1 April 2026
Original
Capital Plan
2026/27
Brought
Forward
25/26 Adjustments
Amended
Capital
Plan
2026/27
£000 £000 £000 £000
Fleet and Plant 2,694 349 0 3,043
Waste Management 124 339 0 463
Property Estate Management 1,317 530 0 1,847
Roads, Bridges and Lighting 5,919 422 1,568 7,909
Open Spaces 371 1,000 115 1,486
Flood Risk Management and Coastal Protection 460 409 600 1,469
Harbours 271 65 0 336
Libraries and Leisure 571 683 0 1,254
ICT 642 107 0 749
Learning Estates 33,445 3,570 0 37,015
Moray Growth Deal 16,074 0 -1,494 14,580
Levelling Up Fund 5,646 0 0 5,646
Elgin Neighourhood Board 360 0 0 360
Funded Spend 0 677 0 677
Emerging Priorities 0 0 460 460
TOTAL EXPENDITURE 67,894 8,151 1,249 77,294
Funding
Prudential Borrowing 44,507 0 0 46,910
General Capital Grant (exc PSHG and CYPA) 7,500 0 998 8,498
Moray Growth Deal 8,775 0 3,539 12,314
Levelling Up Fund/Town Centre Board 5,646 0 0 5,646
Elgin Neighbourhood Board 360 0 0 360
Other Grants & Contributions 1,006 0 2,460 3,466
Receipts generated in year 100 0 0 100
TOTAL FUNDING 67,894 0 6,997 77,294
TMC 30/06/2026
APPENDIX 3
Page 159

Page 160

Page 160

Page 161

Report to: Moray Council Meeting Date: 30 June 2026  
Report by: Executive Director Finance, Strategy & Transformation 
Author: Nicky Gosling Contact Email: nicky.gosling@moray.gov.uk 
Subject: Common Good Funds – Summary Expenditure For 2025/26 and
Estimated Disposable Income For 2026/27 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to inform Council of the final position of Common Good
Funds at 31 March 2026 and the estimated income available for disbursement in 2026/27.  
1.2  This report is submitted to Committee in terms of Section III (B) (16) of the Council's
Scheme of Administration relating to dealing with the Management and Investment of
funds including Common Good. 
2.  SUMMARY  
2.1  The report provides the final outturn for 2025/26 and the budgeted income available for
disbursement in 2026/27 for each of the Common Good Funds, which the Council
administers. 
3.  RECOMMENDATIONS  
3.1  It is recommended that Council:   
i)  note the disbursements approved for 2025/26 for each of the Common Good
Funds shown in APPENDIX 1; 
ii)  approve the carry forward of the undisbursed balances for 2025/26 for the
Buckie, Cullen, Dufftown, Elgin, Portknockie, Keith and Findochty Funds to
be made available in 2026/27; 
iii)  agree the estimated income available for disbursement in 2026/27 shown in
APPENDIX 1; 
iv)  note the Balance Sheet for each Common Good APPENDIX 2; and
Item 10.
Page 161

Page 162

v)  note Common Good Fund asset register APPENDIX 3.   
Nicky Gosling
Senior Accountant (Acting) 
4.  BACKGROUND AND CONTEXT  
4.1  The origins of Common Good Funds in Scotland are late 15th Century and they have been
defined as “all property of a Royal Burgh not acquired under statutory powers or held
under specified trusts”.  
4.2  Until 1975, the Town Councils or those Burghs in Moray having Common Good Funds
managed them.  Moray District Council took over the management until 1996 when this
Council took over responsibility.  The Members of the Council are in a similar position to
Trustees.  
4.3  The Council must retain the ability to continue to make grants from the Common Good
Funds to future generations.  For that reason preservation of the Common Good Funds’
Capital is essential. 
4.4  In addition, it is essential to use the revenue generated from the Funds to maintain the
land and buildings held as assets.  
4.5  The Council is obliged to maintain the Common Good Funds’ Balance whether as land,
buildings or cash.  Common Good Funds’ cash balances can be applied to acquire assets
or to carry out major repairs but Members must be satisfied that such acquisitions or
works carried out will provide a long term and lasting benefit to the particular Community
as a whole.  The same criteria have to apply to any disposal of assets.  
4.6  The Policy and Resources Committee on 20 June 2001 established the Council’s current
policy regarding distribution of the annual income available (paragraph 7 of Minute refers). 
At that time the Committee noted that the true value of money depreciates over time and
in an attempt to keep pace and at the same time to be able to make reasonable levels of
grants from the income earned, it agreed a policy of distributing two-thirds of the annual
income earned with the remaining one-third being retained to maintain the value of the
funds.  
4.7  The Policy and Resources Committee agreed on 16 January 2002 to continue with the
policy of distribution of two-thirds of the estimated annual income available from the
Common Good Funds (paragraph 22 of Minute refers).  The remaining third was to be re-
invested in order to maintain the funds for future generations.  
4.8  The Policy and Resources Committee at its meeting on 2 September 2008 (paragraph 12 of
Minute refers) agreed to allow unspent balances to be carried forward and be available to
use in the following two years.  Any unused funds after two years are added back to the
Fund balance.  At the same meeting the Committee also agreed that any overspends at
the end of the financial year would be limited to 25% of disposable income in that year and
would be replaced over the following two years.  
Page 162

Page 163

4.9  In order to speed up the processing of grant applications, the Policy and Resources
Committee delegated authority to the Head of Financial Services in consultation with
Local Members to consider grant applications and make appropriate awards.  Moray
Council agreed on 13 March 2019 (para 10 of Minute refers) that if two thirds or more of
local members are in agreement it is sufficient authority to proceed under delegated
authority of the Head of Financial Services.  If the agreement of at least two thirds cannot
be obtained on an application then the application will be reported to Policy and
Resources Committee.  
4.10 On 11 June 2024 at Corporate Committee, there was a decision taken that the Millbuies
harvesting income would be excluded from the two-thirds distribution policy (para 14 of
minute refers).  
4.11 Members should note that the Council is required to account for depreciation on Common
Good assets.  As this is an accounting entry only, the disposable income continues to be
calculated prior to the deduction of depreciation.  
5.  PROPOSALS   
2025/26 Disposable Income and Disbursements Approved
5.1  APPENDIX 1 shows details of the estimated income and actual disbursements approved
for 2025/26 for each of the Common Good Funds.  
5.2 
5.3
Buckie Common Good – the 2025/26 variance in Property Income is a result of no rental
income for Nissan Hut, Freuchny Road. 
Elgin Common Good - the 2025/26 variance in Property Income is a result of a rental
increase for Riverside Caravan Park.  
5.4 Forres Common Good – the deficit of £200 in 2025/26 will not reduce the disposable
income in 2026/27 but will be offset against the proceeds of sale for Clovenside.  
5.5 Forres Common Good – the 2025/26 variance in Property Income is the result of the
termination of the lease for Nursery, Bogton Road.  
5.6 
5.7
Forres Common Good income projection for 2026/27 is based on a full year’s rental for the
ground rent at Clovenside. 
Increased Administration Charges for 2025/26 relate largely to work required to update the
Common Good Asset Register.  
5.8 Where rental rebates are awarded, the full amount of the rent is shown as income when
calculating the disbursable income and the rental rebate is shown as a disbursement.   
2026/27 Disposable Income
5.9 APPENDIX 1 details the current financial position of the Common Good Funds and the
estimated disposable income for 2026/27.    
5.10 The estimated income figure is calculated to assist Local Members’ decision making when
allocating grants. The figures are only there as a guide.  If a supported application would
Page 163

Page 164

breach the estimated income limit, disbursement can be made but will require Committee
approval.  
5.11 As can be seen in APPENDIX 1 there are a number of projects which have already been
approved by Local Members for 2026/27.  
5.12 In the calculation of disbursable income it has been assumed that the full amount of
rental income due in 2026/27 will be received.  
5.13 The interest for 2026/27 has been calculated using the Public Works Loan Board (PWLB)
1.5-2yr maturity rate of 5.32% as at the 1 April 2026. This rate is used for two years and will
be updated on 1 April 2028. 
5.14 Analysis of 2026/27 Disbursable Income 
Carry forwards included in Appendix 1 are detailed below:   
Common
Good Fund
2024/25
c/f*
2025/26
c/f*
Projected
Income**
2026/27 
Balance Available
for Disbursement
Buckie - 34,859 61,780 96,639
Cullen 4,784 6,911 6,631 18,326
Dufftown - 552 567 1,119
Elgin - 52,259 71,221 123,480
Forres - - 28,929 28,929
Keith 162 210 416 788
Portknockie 1,204 2,042 1,966 5,212
Findochty 1,164 1,228 1,649 4,041 
* As per policy agreed in para 4.9 above, 2024/25 c/f will be reinvested into reserves if not   
used in 2026/27 and will not be available to spend in 2027/28   
** Projected Income is made up of:-      
Estimated Loans Pool Income      
Plus estimated Rental Income      
Less an admin charge which is based on the prior year's figure        
Two thirds of this figure is available to be disbursed and a third is reinvested into 
reserves.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  ✓
Policy and Legal ✓ 
Financial ✓ 
Risk ✓ 
Page 164

Page 165

Staffing  ✓
Best Value and Transformation  ✓
Property ✓ 
Information Communications Technology/Digital  ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change and Biodiversity Impact  ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☐ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population 
6.3  Policy and Legal 
The Council’s adoption of the policy of retaining one third of disposable income in each
financial year will protect the capital for each of the Common Good Funds and ensure
their sustainability in the future.  
6.4  Financial 
The financial implications are contained in the body of the report and are detailed in the
Appendices. 
6.5  Risk 
The Moray Council Risk Appetite Statement considers Financial and Resource
Management risk as moderate. There is a risk of overspends exceeding 25% of disposable
income if any unforeseen emergency major repairs are required for properties owned by
Common Good Funds. Close monitoring of costs and the condition of properties will be
undertaken by officers in order to mitigate this risk. 
6.6  Staffing 
There are no staffing implications arising from this report.  
6.7  Best Value and Transformation 
None directly arising from this report. 
6.8  Property
Page 165

Page 166

The condition of all Common Good properties will be monitored in order to keep reactive
repairs to a minimum.  
6.9  Information Communications/Technology/Digital
None directly arising from this report. 
6.10  Equalities, Social Inclusion and Economic Impact 
There are no equalities, social inclusion and economic impacts arising directly from this
report.  
6.11  Climate Change and Biodiversity Impacts 
There are no climate change and biodiversity impacts arise directly from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Local Members, Service Manager Legal
Services and Service Manager Democratic Services and any comments made have been
incorporated into the report  
8.  BACKGROUND PAPERS  
8.1  None 
Page 166

Page 167

APPENDIX 1
Buckie Common Good Fund 
Actual Financial Performance against Estimated Figures for 2025-26 
Estimate Actual Variance  
£ £ £     
Property Income  5,415  4,690              725 
Investment Income  92,116 87,767 4,349 
Other Income  - - -  
97,531  92,457  5,074
Less Administrative Costs  1,642  2,604  (962)  
95,889  89,853  6,036
Two thirds  63,926   
C/f undisbursed income from prior years  49,926   
Total Budget Available for Disbursement 2025/26  113,852   
Grants Awarded During the Year         
Fishermen’s Hall  20,000   
Buckie Community Alert Day  1,223   
Buckie - Royal British Legion  5,570  
Buckie Community Sports Hub  10,000  
Buckie & Dist CC – Linzee Gordon Park  6,500  
Buckie & Dist CC – Linzee Gordon Park  20,000  
Buckie Thistle Memory Group  2,000  
Linzee Gordon Community Playpark  5,000  
Buckie Heritage Centre – Rental Rebate  2,700    
72,993   
Other Expenditure         
Grounds maintenance recharge  6,000    
6,000       
Undisbursed Income  34,859   
Page 167

Page 168

Estimated Figures for Disposable Income in 2026/27 
Buckie 
£
Estimated Disposable Income
Undisbursed Income (unused limit carry forward from 2025/26) 
Total Available for Disbursement 2026/27 
Disbursements approved to Date: 
• Buckie Bowling Club
• Buckie Heritage Centre – Rental Rebate
• Grounds Maintenance Recharge
• Buckie Community Alert Day
• Police Patrols 
61,780    
34,859 
96,639     
7,500
2,700
6,000
1,300
5,000  
Projected Income Available for Disbursement 74,139 
Page 168

Page 169

Cullen Common Good Fund 
Actual Financial Performance against Estimated Figures for 2025-26 
Estimate Actual Variance  
£ £ £     
Investment Income  10,466  10,468  (2) 
10,466  10,468  (2)
Less Administrative Costs  99  345  (246)  
10,367  10,123  244
Two thirds  6,911   
C/f undisbursed income from prior years  9,386   
Total Budget Available for Disbursement 2025/26  16,297   
Grants Awarded During the Year         
Cullen Christmas Lights  4,000  
The Three Kings Association  600  
Robert the Bruce Endowment  2   
4,602   
Undisbursed Income  11,695  
Cullen Common Good Fund 
Estimated Figures for Disposable Income in 2026/27 
Cullen 
£
Estimated Disposable Income
Undisbursed Income (unused limit carry forward from 2025/26) 
Total Available for Disbursement 2025/26 
Disbursements approved to Date: 
• Harbour Sign
• Cullen & Deskford CC
• Robert the Bruce Endowment
(This amount is £2.10 accrued annually until sum reaches a
reasonable amount to be paid out) 
6,631  
11,695   
18,326 
1,800
6,500
2
Projected Income Available for Disbursement 10,024 
Page 169

Page 170

Dufftown Common Good Fund 
Actual Financial Performance against Estimated Figures for 2025-26 
Estimate Actual Variance  
£ £ £     
Property Income  -  -  - 
Investment Income  865  879  (14) 
Other Income  8  8  - 
873  887  (14) 
Less Administrative Costs  8  9  (1)  
865  878  (13)
Two thirds  577   
C/f undisbursed income from prior years  483   
Total Budget Available for Disbursement 2025/26  1,060   
Grants Awarded During the Year 
Grounds Maintenance Recharge  508       
Undisbursed Income  552 
Estimated Figures for Disposable Income in 2026/27 
Dufftown 
£
Estimated Disposable Income 567
Undisbursed Income (unused limit carry forward from 2025/26) 
Total Available for Disbursement 2026/27 
Disbursements approved to date:- 
• Grounds Maintenance Recharge 
552      
1,119 
508
Projected Income Available for Disbursement 611 
Page 170

Page 171

Elgin Common Good Fund 
Actual Financial Performance against Estimated Figures for 2025-26 
Estimate Actual Variance  
£ £ £     
Property Income  24,027  26,099  (2,072)
Investment Income  89,018  89,557  (539)
Other Income  - 550 (550)  
113,045  116,206  (3,161)
Less Administrative Costs  3,190  4,733  (1,543)  
109,855  111,473  (1,618)
Two thirds  73,236   
C/f undisbursed income from prior years  40,107   
Total Budget Available for Disbursement 2025/26  113,343   
Actual Grants Awarded         
Elgin Indoor Bowling Club  1,400  
Elgin and District Pipe Band  10,000  
Moray Street Pastors  2,185  
Elgin CC – Xmas Lights  4,000    
17,585   
Other Expenditure         
Contribution to Sonic Seagull Control 2025-26  26,400   
Ladyhill Grass Cutting  667  
Grounds Maintenance Recharge  11,000  
Council Tax 239 High St, Elgin  3,331  
Running Costs 239 High St, Elgin  2,101    
43,499   
Undisbursed Income   52,259   
Page 171

Page 172

Estimated Figures for Disposable Income in 2026/27 
Elgin 
£
Estimated Disposable Income 71,221
Undisbursed Income (unused limit carry forward from 2025/26) 
Total Available for Disbursement 2026/27 
Disbursements approved to Date: 
• Sonic Seagull Deterrent
• Grounds Maintenance Recharge
• Ladyhill Grass Cutting
• Elgin Police – Traffic Enforcement 
52,259     
123,480 
34,740
11,000
667
10,000
Projected Income Available for Disbursement 67,073 
Page 172

Page 173

Forres Common Good Fund 
Actual Financial Performance against Estimated Figures for 2025-26 
Estimate Actual Variance  
£ £ £     
Property Income  33,705  32,413  1,292 
Investment Income  27,124  28,159  (1,035)
Other Income  -  200 (200)  
60,829 60,772  57
Less Administrative Costs  3,198  3,784  (586) 
57,631  56,988  643
Two thirds  38,420  
C/f undisbursed income from prior years    
Total Budget Available for Disbursement 2025/26  38,420   
Grants Awarded During the Year    
Forres in Bloom 2025  4,000  
Forres Christmas Lights   600  
Forres Mechanics  2,158  
Transition Town Forres Rental Rebate  8,700   
Advert re Land at Clovenside  200  
Grounds Maintenance Recharge  22,962  
Undisbursed Income  (200)   
Estimated Figures for Disposable Income in 2026/27 
Forres 
£
Estimated Disposable Income 28,929
Undisbursed Income (unused limit carry forward from 2025/26) 
Total Available for Disbursement 2026/27 
Disbursements approved to Date:
• Grounds Maintenance Recharge 
-
28,929 
22,962  
Projected Income Available for Disbursement 5,967  
Page 173

Page 174

Portknockie Common Good Fund 
Actual Financial Performance against Estimated Figures for 2025-26 
Estimate Actual Variance  
£ £ £     
Investment Income  3,091  3,139 (48)  
3,091  3,139  (48) 
Less Administrative Costs  29  91  (62)  
3,062  3,048  14
Two thirds  2,042   
C/f undisbursed income from prior years  2,704   
Total Budget Available for Disbursement 2025/26  4,746   
Grants Awarded During the Year  1,500       
1,500       
Undisbursed Income  3,246   
Estimated Figures for Disposable Income in 2026/27 
Portknockie 
£
Estimated Disposable Income 1,966
Undisbursed Income (unused limit carry forward from 2025/26) 
Total Available for Disbursement 2026/27 
Disbursements approved to Date:
3,246 
5,212 
Projected Income Available for Disbursement 5,212 
Page 174

Page 175

Keith Common Good Fund 
Actual Financial Performance against Estimated Figures for 2025-26 
Estimate Actual Variance  
£ £ £     
Investment Income  642  652  (10) 
642  652  (10) 
Less Administrative Costs  326  1,016  (690) 
316  (364)  680
Two thirds  210   
C/f undisbursed income from prior years  372   
Total Budget Available for Disbursement 2025/26  582   
Grants Awarded During the Year     
Ground Maintenance Recharge  210       
Undisbursed Income  372   
Estimated Figures for Disposable Income in 2026/27 
Keith 
£
Estimated Disposable Income
Undisbursed Income (unused limit carry forward from 2025/26)
416                 
372   
Total Available for Disbursement 2026/27 
Disbursements approved to Date: 
• Grounds Maintenance Recharge 
788 
210
Projected Income Available for Disbursement 578 
Page 175

Page 176

Findochty Common Good Fund 
Actual Financial Performance against Estimated Figures for 2025-26 
Estimate Actual Variance  
£ £ £     
Investment Property Income  1,500  1,500 - 
Investment Income  421  485  (64)  
1,921 1,985  (64)
Less Administrative Costs  79  140 (61)  
1,842  1,845 (3)
Two thirds  1,228   
C/f undisbursed income from prior years  2,149   
Total Budget Available for Disbursement 2025/26  3,377   
Grants Awarded During the Year 
Findochty Community Council  298       
298   
Undisbursed Income  3,079   
Estimated Figures for Disposable Income in 2026/27 
Findochty 
£
Estimated Disposable Income 1,649
Undisbursed Income (unused limit carry forward from 2025/26) 
Total Available for Disbursement 2026/27 
2,392 
4,041 
Projected Income Available for Disbursement 4,041 
Page 176

Page 177

Millbuies Country Park 
Actual Financial Performance for 2025-26 
Actual  
£
Total Budget Available for Disbursement 2025/26  7,498 
Other Costs   
Pathworks at Millbuies (2025/26)  7,498
Surplus/(Deficit)  -   
Estimated Disposable Income in 2026/27 
Millbuies Forestry Operations 
£
Projected Income Available for Disbursement Nil 
Page 177

Page 178

Appendix 2                         
Balance Sheet as at 31st March 2026 by Common Good Fund     
Buckie Cullen Dufftown Elgin Forres Portknockie Keith Lossie Findochty Millbuies Total  
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Fixed Assets   2,456   17  -  11,100   2,076  -  304   1,935  - -  17,888 
Current Assets            
Debtors and Stocks   1  - -  10 - - - - - -  11 
Loans Fund
Balance   1,714   199   16   1,694   520   60   11  -  9   -   4,223 
1,715   199   16   1,704   520   60   11  -  9   -   4,234             
Current
Liabillities            
Creditors  - - -  1   4  - - -  1  -  6 
- - -  1   4  - - -  1  -  6 
Total Net Assets    4,171   216   16  12,803   2,592   60   315   1,935  8   -   22,116 
Financed By:            
Revaluation
Reserve   2,419   17  -  9,906   1,111  -  61   1,935 - -  15,449 
Revenue Balance   1,752   199   16   2,897   1,481   60   254  -  8   -   6,667 
Reserves    4,171   216   16  12,803   2,592   60   315   1,935   8  -   22,116 
Page 178

Page 179

APPENDIX 3 
Common Good Asset Register  
Buckie Common Good 
Town House West (Hall), Cluny Place, Buckie AB56 1HB 
Library, Cluny Place, Buckie, AB56 1HB 
Fishing Heritage Centre, Cluny Place, Buckie AB56 1HB 
Town House West (Offices), Cluny Place, Buckie AB56 1HB 
Public Toilets, Cluny Place, Buckie 
Sites Opposite 26 Barron St, Buckie AB56 1XD 
42A Freuchny Rd, Buckie AB56 1TX 
25B East Cathcart St, Buckie AB56 1JP 
Site to rear of 5 Bridge Place, Buckie 
Store, Freuchny Road, Buckie 
Linzee Gordon Park, Buckie - Public Park, Play Area and Pavilion 
Cricket Club Linzee Gordon Park, Buckie 
Pavilion And Football Ground, 
Merson Park, 
Barhill Road, 
Buckie 
Merson Park - Public Park and Play Area 
Buckie Victoria Bowling Club, West Church Street, Buckie 
Heritable Assets - Ansons Collection 
Heritable Assets - Chains of Office    
Cullen Common Good 
Market Cross Monument, The Square, Cullen 
Heritable Assets - Chains of Office    
Dufftown Common Good 
Tininver Park, Tininver Street, Dufftown 
Store, Tininver Street, Dufftown 
Woodland Princess Royal Park Conval Street Dufftown 
Woodland Bridge Of Poolinch Dufftown 
Woodland Tininver Brae Dufftown 
Woodland Mortlach Distillery Dufftown    
Elgin Common Good 
239 High Street, Elgin, IV30 1DJ 
Site Adjacent To 239 High Street Elgin Moray 
Riverside Caravan site, Elgin IV30 8UN 
Field Adjacent to The Oaks, Morriston Road, Elgin 
Field Adjacent to Oakview, Morriston Road, Elgin 
Shooting Acres & Aughteen Park Lands, Pluscarden Road, Elgin 
Moray Leisure Centre, Borough Briggs Road IV30 1AP 
Field at Riverside, West Road, Elgin 
Ground adjacent to The Mansion House, Blackfriars Rd, Elgin 
The Oaks, Morriston Road, Elgin IV30 6UN 
Playing field, Borough Briggs Rd, Elgin 
Lesser Borough Briggs, Borough Briggs Road, Elgin 
Play area, McIntosh Drive, Elgin
Page 179

Page 180

Play area, Ardgilzean Place, Elgin 
Loch and Country Park, Millbuies, Elgin 
Field at Country Park, Millbuies, Longmorn, Elgin 
Depot Cooper Park, Elgin 
Greenfingers Nursery, King Street , Elgin IV30 1HU 
Biblical Gardens, King Street, Elgin 
Training Centre, Cooper Park, King Street, Elgin 
Rainbow Castle, Borough Briggs Road, Elgin 
Dovecot Pavilion, Elgin 
Monument, Prospect Terrace, Lossiemouth (Charter of Novodamus) 
Site opposite 2 Seatown, Lossiemouth (Charter of Novodamus) 
Public Convenience, Seatown Rd, Lossiemouth IV31 6JL (Charter of
Novodamus) 
Heritable Assets - Chains of Office    
Forres Common Good 
Forres Mechanics Football Ground, Mosset Park, Lea Rd, Forres IV36 1AU 
Forres Bowling Club, St Catherines Rd , Forres 
Nelsons Tower 
The Greens, Forres 
Transition Town Forres Car Park, Bogton Road, Forres IV36 3TW 
Transition Town Forres, Bogton Road, Forres IV36 3TW 
Bogton Playing Field and Play Area, Bogton, Forres 
Christies Elite Nurseries Limited, Bogton Rd, Forres IV36 3TW 
38a Clovenside Road (adjacent to Clovenside Cemetry), Forres 
Field, Pilmuir Road West, Forres 
Kingsmeadow Field, Forres 
Field A Clovenside 
Field B Clovenside 
Market Cross Monument, High St, Forres 
Forres Golf Course, Forres IV36 2RD 
Land at mouth of River Findhorn 
Applegrove Garden, Sanquhar Road, Forres 
Roysvale Park and Pavillion, Sanquhar Road, Forres 
Heritable Assets - Chains of Office    
Keith Common Good 
Nursery Park, Keith 
Show Ground Store, Seafield Park, Keith AB55 5AJ 
Pavillion, Seafield Park, Keith 
Seafield Park, Keith 
Heritable Assets - Chains of Office    
Lossiemouth Common
Good 
Coulardbank Pavillion, Coulardbank Playing Fields, Lossie 
Coulardbank Playing Fields, Coulardbank Road, Lossiemouth 
Pitch Coulardbank Playing Fields, Coulardbank Road, Lossiemouth 
1st Lossiemouth Scout Hall, Elgin Road, Lossiemouth IV31 6HD 
Town Hall,  High Street,  Lossiemouth   IV31 6AA 
Lossiemouth Library,  High Street,  Lossiemouth   IV31 6AA 
Heritable Assets - Chains of Office    
Page 180

Page 181

Findochty Common Good 
Telecommunications Mast, Town Hall, 22 Station Road, Findochty    
Burghead Common Good 
St Aethans Park and Play Area, St Aethans Rd, Burghead 
Heritable Assets - Chains of Office  
Rothes Common Good     
May Park, Rothes, AB38 7AG  
Page 181

Page 182

Page 182

Page 183

Report to: Moray Council Meeting Date: 30 June 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Eily Webster Contact Email: Eily.Webster@moray.gov.uk 
Subject:  Elgin Neighbourhood Board- Appointment of Chair 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to agree and appoint the Chair of Elgin Neighbourhood Board
following an open recruitment process.  
1.2  This report is submitted to Council in terms of Section II (19) of the Council’s Scheme of
Administration relating to a new policy matter which does not fall within the terms of
reference of any Committee.  
2.  SUMMARY  
2.1  The report outlines the recruitment process followed to advertise, interview and select the
preferred candidate who is recommended to Council as the new Chair of Elgin
Neighbourhood Board.  
3.  RECOMMENDATIONS  
3.1  It is recommended that Council:   
i)  note the recruitment process followed by Elgin Neighbourhood Board to
appoint a new Chair; 
ii)  agree to appoint Jackie Andrews as Chair of Elgin Neighbourhood Board; and   
iii)  agree that the Chief Executive write a letter of thanks to the outgoing Chair
and Vice Chair   
Eily Webster
Service Manager Strategic Planning and Development 
Item 11.
Page 183

Page 184

4.  BACKGROUND AND CONTEXT  
4.1  Elgin is one of the towns awarded funding through the UK Government Pride in Place
programme. The Elgin Neighbourhood Board is the governing body for the Fund with the
Council being the financially accountable body.  
4.2  In March 2026 the Chair and Vice Chair announced their intention to resign from their roles
as the Regeneration Plan had been approved by the UK Government and the programme
moved into delivery. The Board agreed to conduct an open recruitment process in line with
the UK Government guidance.  
4.3  The appointment of the Vice Chair position is a matter for Elgin Neighbourhood Board,
however the appointment of the Chair is done by the Council. The guidance states;
“Each Neighbourhood Board will be led by an independent Chair, appointed and approved
by the local authority and the MP. 
In instances where the local authority and MP are unable to reach consensus on the
appointment of a suitable Chair, MHCLG will intervene to facilitate and broker an
agreement. 
The Chair should act as a champion for the place and provide leadership for the Board,
ensuring it is community-led and embedded within the local area. We expect that the
Chair should be someone who is “from”, living or working in the area, holds a prominent
role in the community or has a passion for the place……”. 
5.  PROPOSALS  
5.1  An interview panel was agreed by the Board to oversee the recruitment process. The Chair
and Vice Chair positions were advertised through the press, social media channels and
through Board members communication networks. Interested parties were invited to
submit an Expression of Interest by 17 April 2026. At the April Board meeting it was agreed
to extend the deadline by a further 7 days. 8 applications were received and the selection
panel decided to progress 5 applicants to interview stage, with interviews held on 1 May
and 8 May 2026. 
5.2  Candidates interviewed were of a very high standard, bringing a range of skills and
experience from different backgrounds. Following an assessment and scoring process the
panel recommended to the Board that Jackie Andrews is the preferred candidate for the
position of Chair, subject to approval and appointment by Moray Council. These
appointments were agreed at the meeting of the Board on 22 May 2026. In accordance
with the guidance, Graham Leadbitter was consulted on the recommendations and
agreed.  A brief biography of Jackie Andrews is provided in Appendix 1 annexed to this
Report. 
5.3  This appointment will bring a wealth of knowledge, experience and passion for Elgin and
the panel considered the Chair and new Vice Chairs would work effectively together and
ensure smooth succession planning and a good working relationship between partner
organisations. The recommended appointment also brings a significant network of
contacts which will be invaluable to “create a buzz” in Elgin, as the Board announce the
initial portfolio of projects being supported and how the public feedback has been taken
Page 184

Page 185

into account. Subject to agreement by the Council, due diligence checks will be carried
out on the proposed new Chair.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT Yes No
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ☒ ☐
Policy and Legal ☒ ☐
Financial ☐ ☒
Risk ☒ ☐
Staffing ☐ ☒
Best Value and Transformation ☐ ☒
Property ☐ ☒
Information Communications Technology/Digital ☐ ☒
Equalities. Social Inclusion and Economic Impact  ☒ ☐
Climate Change and Biodiversity Impact ☐ ☒ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☒ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☒ Improving wellbeing of our population   
6.3  Policy and Legal 
The process for recruitment of the Chair is set out in national guidance.  
6.4  Financial 
None. 
6.5  Risk 
None.  
6.6  Staffing 
None.
Page 185

Page 186

6.7  Best Value and Transformation 
None.  
6.8  Property 
None.  
6.9  Information Communications/Technology/Digital 
None. 
6.10  Equalities, Social Inclusion and Economic Impact 
None. An open and transparent recruitment process was undertaken.  
6.11  Climate Change and Biodiversity Impacts 
None. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Executive Director Economy,
Environment and Operations, Chief Governance Officer, Head of Growth, Planning and
Climate, Service Manager Democratic Services and any comments made have been
incorporated into the report. 
8.  BACKGROUND PAPERS  
8.1  Report to Moray Council on 6 November 2025 Elgin Neighbourhood Board Regeneration
Plan.   
Page 186

Page 187

APPENDIX 1 
Jackie Andrews
Jackie has lived and worked in Moray for the past 37 years, the majority of which she spent at UHI
Moray, initially as a lecturer but most recently as Head of Academic Partnerships, where she worked
to strengthen collaboration between education, industry and the wider community to create
opportunities for learners and support regional skills development.  
Jackie`s interest in education continues and she currently sits on the National Schools Programme
Strategic Advisory Group and has recently joined the UHI Moray Board.  Jackie remains actively
involved in community initiatives. Jackie is the Chair of Elgin Town Hall for the Community, helping
support its role as an important cultural and community space, and a Board Member of the Elgin
Neighbourhood Board, contributing to local investment and regeneration in the town. Jackie is also
co-founder of The CoatHangar, a volunteer-led initiative that provides warm winter coats for people
in need across the Moray community.  In her spare time, Jackie is a member of Rotary Elgin, and
volunteers with the Elgin Illuminations Group. 
Page 187

Page 188

Page 188

Page 189

Report to: Moray Council  Meeting Date: 30 June 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Alasdair McEachan Contact
Email:
Alasdair.mceachan@moray.gov.uk 
Subject: Council Records Management Plan 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  To note the position in relation to the external inspection of the Council’s Records
Management Plan and to agree an Action Plan to address outstanding issues. 
1.2  This report is submitted to the Council as it addresses issues delegated to a number of
service committees. 
2.  SUMMARY  
2.1  The Council is required to submit a Records Management Plan (RMP) for approval of the
Keeper of the National Records of Scotland (“the Keeper”) 
2.2  The Keeper has identified a number of issues, which they require further assurance on
before the Council’s RMP can be approved. These broadly include: 
• Updating Council records management guidance  
• Improving handling of closed records
• Introducing electronic document management across all Council areas
• Providing a suitable repository for the Council’s archives 
2.3  An Action Plan has been prepared to address these issues with allocation of additional
temporary staff resource. 
2.4  The Council are asked to note these outstanding issues and to agree the Action Plan. 
3.  RECOMMENDATIONS 
3.1  It is recommended that the Council:   
i)  note the issues identified for improvement by the Keeper outlined in section
four below;   
ii)  agree the Action Plan to address these issues at Appendix 1;
Item 12.
Page 189

Page 190

iii)  agree that the progress on implementation of the Action Plan will be
monitored through the Corporate Risk Register and the Information
Governance Annual report; and   
iv)  note the temporary additional resource being directed to implement the
Action Plan.   
Alasdair McEachan 
Chief Governance Officer 
4.  BACKGROUND AND CONTEXT  
4.1  Section 1 of the Public Records (Scotland) Act 2011 requires the Council to prepare a
Records Management Plan (RMP) for submission and agreement by the Keeper.  The
Council’s RMP was last submitted to the Keeper in January 2021.  The plan also covers
Moray Licensing Board. 
4.2  The Keeper assesses submitted plans against the Model Records Management Plan
(Model RMP) issued under the 2011 Act.  
4.3  The Keeper notified the Council in January 2026 that they were minded not to approve the
Council’s RMP and highlighted a number of issues on which they required further
assurance. Officers had anticipated the issues which were likely to cause concern.  These
were highlighted in the Council’s Information Governance Annual Report, which was
considered by the Corporate Committee on 4 November 2025. (para 7 of the minute
refers). The position taken by the Keeper now requires a more immediate focus to address
these issues. 
4.4  A cross-departmental  Action Plan, separate from the RMP has been prepared to address
the issues identified by the Keeper and a summary of the areas addressed by the Action
Plan is given in the following paragraphs: 
4.5  Records Management Policies and Guides
Issue: A number of Council policies, procedures and guides are overdue for review. These
include how Council staff identify and manage data, documents and records; how long
each should be retained, their classifications as well as the management of Closed
Records.  These guidance documents also need updating to govern new ways of working,
such as communication on Microsoft teams and greater working with partners, such as
through the Health and Social Care partnership. Given competing operational demands,
the Council’s Information Governance team have been unable to give this area priority. 
Action: Temporary staffing resource has been identified to review and update these
policies and to ensure that they are accessible to staff creating and managing information. 
4.6  Implementation of an Electronic Document Management System (EDRMS) 
Issue: A number of Council services currently use Microsoft SharePoint 2013 on-premise -
a deprecated legacy platform - for the storage of records. A project to migrate from this
platform to SharePoint Online is underway. Both systems support retention policies and
are suitable for records management purposes.
In addition, some services use third-party line-of-business systems (such as the
Page 190

Page 191

committee management system) which include built-in retention controls.
However, a number of services continue to rely on shared network drives, where
information owners are required to manually manage files in accordance with agreed
retention policies. This creates inconsistency in how records are managed across the
organisation.
The Keeper has highlighted this inconsistency and is encouraging the Council to extend
EDRMS coverage across all services to ensure a more standardised and compliant
approach to records management.
Action: A corporate project is underway to migrate appropriate content from legacy
platforms and shared drives to SharePoint Online, with completion scheduled for June
2027. The project is being delivered and monitored through the Council’s Transformation
Programme. 
4.7  Archives Store
Issue: The Council’s archive collection consists of a number of unique records, including
valuable historical documents and the Council’s corporate archives, as well as some
artefacts. Following a fire at a previous location the collection was moved to a temporary
industrial unit. Whilst some adaptations were made to the unit it is not a suitable long
term archival solution as it does not meet the relevant British Standards, and, the Keeper
has concerns that the building is inadequate for archival storage.  
There is also a significant backlog of items requiring accessioning into the collection and
cataloguing. 
Action: The Action Plan commits to a review of the Council’s asset management review
project to bring the Archives Store within scope of the review. This project will be
monitored through the Council’s Transform Programme. 
Temporary additional staffing has been identified to review assets within the collection to
make sure that the most valuable assets are suitably stored and that the collection is
more generally rationalised. 
4.8  Closed Records
Issue: The Council’s Closed Records are held in 3 separate sites across Moray. Given
competing demands and limited resources, the Information Governance team have been
unable to prioritise the accession, review and destruction of records.  There is now a
backlog of records requiring attention. 
Action: The Action plan allocates resource to address this backlog and, with links to the
wider work on asset management, work will be undertaken to review the best location(s)
for the Council’s Closed Records Stores. 
Completion of the EDRMS detailed at paragraph 4.6 above should mean fewer paper
records requiring physical storage, which over time this should reduce the volume of
records in the Closed Records Store. 
4.9  Timing of Action Plan
The majority of actions within the Action Plan will be undertaken by June 2027 with regular
update reports scheduled for the council’s Central Leadership Team meantime. 
4.10  Next steps 
Page 191

Page 192

In light of their ongoing concerns, the Keeper will likely return the Council’s RMP without
approval and require amendment/ re-submission. 
Whilst this would create reputational risk for the Council, NRS have recognised the
Council’s commitment to addressing their areas of concern following a recent a recent
meeting with the Council’s Chief Executive. 
4.11  Officers are confident that, with the proposed actions in the Action Plan, the Records
Management Plan will be able to be updated to a standard for approval by the Keeper. 
4.12  The Council would normally have to submit a fresh RMP every five years. The RMP under
discussion was submitted in 2021 and the formal response from the Keeper received in
Jan 2026. Agreement will need to be reached with the Keeper on timing for submission the
next statutory RMP update. 
5.  PROPOSALS  
5.1  It is proposed that the Council approve the Records Management Action Plan attached as
Appendix 1 to this report. 
5.2  It is proposed that progress on implementation of the Action Plan will be monitored
through the Corporate Risk Register and the Information Governance Annual report.  
6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan)  x
Policy and Legal x 
Financial x 
Risk x 
Staffing x 
Best Value and Transformation x 
Property x 
Information Communications Technology/Digital x 
Equalities. Social Inclusion and Economic Impact   x
Climate Change and Biodiversity Impact  x 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
continuous improvement through Best Value, will better enable the Council to fulfil the
ambitions set out in its strategic plans.   
6.3  Policy and Legal 
Section 1 of the Public Records (Scotland) Act 2011 requires the Council to prepare a
Records Management Plan for submission and agreement by the Keeper.  Sitting below the
Records Management Plan there are a number of detailed plans and policies which the
Council requires to have to demonstrate if is managing public records effectively.    
Page 192

Page 193

6.4  Financial 
The additional temporary staffing costs detailed in para 6.6 are to be funded through one
off corporate savings achieved on renewing our insurance provision, which have been
realised since budget was approved in February 2026. 
6.5  Risk 
In terms of the Corporate Risk Register there is a risk of reputational damage to the
Council if it is found to have inadequate policies and processes in place. The Council have
a low appetite for this risk which is being mitigated by the implementation of the proposed
Records Management Action Plan. 
6.6  Staffing 
An estimate of the additional temporary staffing required to address the outstanding
issues identified by the Keeper is given under each action with the Action Plan.  
This can be accommodated within existing resources.  Totals, for a fixed period of 1 year
across the Information Governance Team and the Libraries team are:
Grade 8- 0.8 fte
Grade 6 -1.1 fte
Grade 4 – 0.6 fte
Grade 3- 1.5 fte
This staffing need is being met partly through secondment and additional hours and partly
through temporary recruitment.    
Consideration will then be given to a longer term sustainable staffing level. 
6.7  Best Value and Transformation 
Elements of the action plan will assist in the Council’s Best Value duty: improvement in
how the Council manages its records and efficiency in use of resources. 
6.8  Property 
There are property implications for the Archives Store and Closed Records Stores which
are detailed in paragraphs 4.7 and 4.8 above. 
6.9  Information Communications/Technology/Digital 
There are implications for corporate adoption of EDRMS which are detailed in paragraph
4.6 above. 
6.10  Equalities, Social Inclusion and Economic Impact 
None 
Page 193

Page 194

6.11  Climate Change and Biodiversity Impacts 
None 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with the Executive Director, Housing &
Communities, Chief Financial Officer, Head of Customer Experience ICT and Digital
Services, Head of Housing Property and Communities, Service Manager Legal Services,
Information Governance Manager and Service Manager Democratic Services and any
comments made have been incorporated into the report. 
8.  BACKGROUND PAPERS  
8.1  Information Governance Annual report 4 November 2025   
Page 194

Page 195

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 1 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
1. Senior Officer
The Act requires a named senior officer with corporate responsibility
for records management. The Keeper accepts the role where clearly
identified and supported, but expects updates whenever posts
change.
The named posts in the
current plan are out of date
following the 2025
restructure.
Update the named senior
responsible officers in the
plan and supporting letter.
IGM Within existing resources. Jun 2026 
Page 195

Page 196

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 2 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT
COUNCIL POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
2. Records Manager
The Act requires a named officer with operational responsibility for
records management, supported by the necessary authority, skills
and resources. Any change in postholder must be reflected in the
plan.
Only a minor
amendment is
needed to the
Information
Governance
Manager job
description.
Finalise the IGM job
description to confirm
records management
responsibilities.
LSM/IGM Within existing resources. June 2026 
Page 196

Page 197

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 3 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED
RESOURCES TIMESCALES
3. Policy
NRS requires an up-to-date records management policy, refreshed
guidance, and evidence that staff can access these documents.
The current policy framework needs to show clearer review
arrangements and delivery.
Policies and procedures are in
place and accessible to staff,
but several documents now
need updating and
consolidation.
Produce a records and
information management
policy framework, prioritise
updates to supporting
guidance, and develop a staff
training module. Delivery
assumes agreed additional
resource.
IGM Approx. 355 hours Grade
8 and 59 hours Grade 10.
June 2027 
Page 197

Page 198

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 4 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED
RESOURCES TIMESCALES
4. Business Classification
The Keeper expects a clear and consistent structure for managing
records across all services and systems, including repositories
outside M365. This element needs stronger evidence and a clearer
improvement programme.
Phase 1 migration from
SharePoint 2013 to
SharePoint Online is under
way. Phase 2, covering
shared drives and other
repositories, is planned from
June 2026. A project team
and initial guidance are in
place.
Complete Phase 1 migration,
begin Phase 2 for remaining
services, and provide
evidence that non-M365
repositories are being
managed under appropriate
controls.
Head of
Customer
Experience
ICT/Digital
IGM
ICT project resource
identified. Info Gov
support estimated at
0.1 FTE Grade 10/11
and 0.4 FTE Grade 8,
plus service input as
the project progresses.
June 2026 to
June 2027 
Page 198

Page 199

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 5 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
5. Retention Schedule
The Keeper expects retention periods to be applied
consistently across all records, including shared drives and
line-of-business systems. Further assurance is needed on
current controls and the planned move to M365.
Retention schedules exist, but
application remains partly
manual. The Council is
updating schedules alongside
national SCARRS work and
aims to build in more
automated retention over time.
Provide senior assurance,
refresh the core retention
schedule, review SharePoint
retention settings, and carry
out compliance checks across
key systems and repositories.
KG
IGM
Approx. 21 hours Grade
10/11/12 and 90 hours Grade
8.
Jun 2026 to
Dec 2026       
Page 199

Page 200

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 6 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
6. Destruction Arrangements The Act requires records to be destroyed securely, promptly
and in a controlled way. The Keeper seeks clearer evidence
for shared drives, email and major line-of-business systems.
Destruction is mainly manual
and depends on services
applying retention guidance.
Email guidance has been
updated, and secure
destruction can be evidenced,
but assurance is limited.
Focus resource on migration to
EDRMS/M365 and review
whether major business
systems offer automated
retention and destruction
controls.
IGM SharePoint project resource
plus service specialist input
and about 0.1 FTE Grade 8.
June 2027 
Page 200

Page 201

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 7 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
7. Archiving and Transfer
The Keeper requires stronger arrangements for preserving
and transferring archival records, supported by an action
plan, interim assurance and updated handling guidance.
Archive and closed records
storage remains unsuitable
and is not yet addressed
through the current asset
review. A fuller service
review is likely to fall in
2027/28.
Prepare options for
relocation, triage higher-risk
archive material, review the
accession policy, update
guidance, and establish a
sustainable long-term
archive solution.
Head of
Housing,
Property and
Communities
Principal
Librarian
KG
Options work within existing
resources. Temporary review
resource estimated at 20
hours Grade 10, 1 x 6
months Grade 6 and 3 x 6
months Grade 3.
Sept 2026 to
March 2027 
Page 201

Page 202

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 8 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
8. Information Security The Keeper expects records to be managed in line with
current information security requirements and needs either
an updated policy or a clear review timetable.
The Information Security
Policy is currently being
updated.
Complete and issue the
updated Council Information
Security Policy.
Head of
Customer
Experience
ICT and
Digital
Services
Within existing resources. June 2026 
Page 202

Page 203

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 9 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
9. Data Protection
The Keeper is satisfied that arrangements are in place to
support compliance with data protection law, but the position
must be kept under review as requirements change.
Core arrangements remain in
place, but further work is
needed on the Information
Asset Register, related
policies and new duties
arising from the Data Use and
Access Act 2025. Service
reviews are ongoing.
Address policy updates
through the wider records and
information management
framework at Element 3.
IGM Covered within existing
programme.
June 2027 
Page 203

Page 204

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 10 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
10. Business Continuity and
Vital Records
The Keeper expects vital records and record recovery to be
built into business continuity planning, with evidence of
recovery arrangements and progress on review work.
Information governance review
work, including the
Information Asset Register,
provides a basis for a
dedicated business continuity
plan for the function.
Prepare a business continuity
plan for the Council’s
information governance
function.
IGM Approx. 15 hours Grade 8. October
2026 
Page 204

Page 205

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 11 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
11. Audit Trail
The Keeper expects records to be traceable through effective
audit arrangements. More evidence is needed for closed
records, shared drives, business systems and use of naming
and version control guidance.
Planned migration from
shared drives and
updated guidance should
improve compliance, but
closed records
arrangements and some
repository controls still
need work.
Update guidance through
Element 3, reduce reliance
on paper storage, clear the
closed records backlog,
and identify a sustainable
long-term resource for CRS
management.
IGM
Head of
CE/ICT/Digital
LSM
Digital work sits within
transformation activity.
Closed records backlog
estimated at 0.6 FTE
Grade 4 and 0.4 FTE
Grade 6.
Oct 2026 to June
2027 
Page 205

Page 206

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 12 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
12. Competency
Framework for records
management staff
The Keeper expects staff who create or manage records to
be appropriately trained and supported, with evidence that
the training module is available or a clear delivery plan.
The records management
LearnPro module has not yet
been completed.
Update and complete the
LearnPro module as part of the
wider policy and guidance
work under Element 3.
IGM Covered under Element 3. Dec 2026 
Page 206

Page 207

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 13 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
13. Assessment and Review The Act requires the RMP to be kept under review. The Keeper
wants a clear review method and frequency, alongside the
latest annual information governance report.
An annual Information
Governance Report is already
produced and published on
the Data Protection
Interchange page.
Provide the latest annual
report and this action plan as
evidence of review
arrangements.
IGM Existing resources. April 2026 
Page 207

Page 208

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 14 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
14. Shared Information
The Keeper expects information sharing to be lawful,
necessary and controlled, and requires sample sharing
agreements and the Council’s data protection guide as
evidence.
The updated Data Protection
Guide is being prepared
following the 2025 policy
update. Other supporting
evidence can be supplied in
redacted form.
Provide the updated guide and
sample redacted sharing
documentation.
IGM Existing resources. Jun 2026 
Page 208

Page 209

NRS ASSESSMENT REPORT - ACTION PLAN ON COUNCIL RECORDS MANAGEMENT PLAN 
Updated April 2026
Page 15 of 15
SPMAN-1024035114-1227              23/06/2026 16:33
ELEMENT SUMMARY OF NRS POSTION CURRENT COUNCIL
POSTION ACTION REQUIRED WHO ESTIMATED RESOURCES TIMESCALES
15. Public records created
or held by third parties
The Keeper expects adequate arrangements for records
created or held by contractors and other third parties,
supported by evidence of contractual clauses and progress
on implementation.
Information Governance is
working with Procurement and
services so that new and
renewed contracts properly
address personal data and
public records requirements.
Provide the updated standard
contract terms, contract
register information,
procurement guidance and
sample contractual clauses as
evidence.
CFO
IGM
Within existing resources. June 2026 
Page 209

Page 210

Page 210

Page 211

Report to: Moray Council Meeting Date: 30 June 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Louise Ross Contact Email: Louise.ross@moray.gov.uk 
Subject: Timeline Options for Consideration of a potential draft Visitor Levy
Scheme 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to seek agreement to proceed with the development of a draft
Visitor Levy Scheme proposal for Moray, to be brought before Council for consideration in
August 2027.  
1.2  This report is submitted to Council in terms of Section III (A) (2) of the Council’s Scheme of
Administration relating to long term financial plans.  
2.  SUMMARY  
2.1  The Visitor Levy (Scotland) Act 2024, enacted in July 2024, empowers local authorities to
charge a levy on overnight accommodation to fund tourism infrastructure, environmental
sustainability, and the local economy.  
2.2 Preparatory work to support the potential introduction of a Visitor Levy Scheme in Moray
has been further delayed pending consideration of the Moray Tourism Strategy by the
Economic Development and Infrastructure Committee (ED&I) on 16 June 2026.  This
report presents the two proposed dates for Council consideration of a draft Visitor Levy
Scheme proposal for Moray together with the risks associated for each option and the
essential preparatory steps required.  The timeline for potentially implementing a scheme
differs by 4 months between the options.  
2.3 In addition, the report provides an update on legislative amendments to the Act
introduced through the Visitor Levy (Amendment) (Scotland) Bill, enacted 21 May 2026.  
3.  RECOMMENDATIONS 
3.1  It is recommended that Council:   
Item 13.
Page 211

Page 212

i)  note the legislative amendments to the Act introduced through the Visitor
Levy (Amendment) (Scotland) Bill, enacted 21 May 2026;   
ii)  note the two timeline options presented for the development of a draft Visitor
Levy Scheme proposal;   
iii)  agree to proceed with the development of a draft Visitor Levy Scheme
proposal based on the timeline for a report to be brought before Council in
August 2027; and   
iv)  approve the additional resources implications associated with each option.   
Louise Ross
Development Officer (Acting) 
4.  BACKGROUND AND CONTEXT  
4.1  The Visitor Levy (Scotland) Act 2024, enacted in July 2024, empowers local authorities to
apply a levy on overnight accommodation to support tourism infrastructure,
environmental sustainability and the local economy.  
4.2  Following feedback, the legislation was amended through the Visitor Levy (Amendment)
(Scotland) Act, enacted on 21 May 2026. These amendments provide additional flexibility,
including the ability to apply a flat-rate levy, however they do not impact on the timetable
options presented within this report.  
4.3  Previous Council decisions:
• At a meeting on 27 September 2023, Council agreed to support in principle the
concept of raising funds through a VL (para 13 of the minute refers).
• At a meeting on 19 February 2025, Council agreed to the commencement of Stage 1
development of a Visitor Levy Scheme (para 16 of the minute refers)  
4.4  In addition, an information report was provided to Council on 3 December 2025 on the
development of a Visitor Levy Scheme timeline.   
4.5  The timeline presented included: 
• undertaking pre-consultation work on a potential Visitor Levy Scheme alongside
development of the new Tourism Strategy. However, it is now recognised that a current
approved tourism strategy should be in place prior to commencing full pre-
consultation activity to ensure any levy proposal is aligned to agreed priorities and
provides a robust framework for stakeholder engagement, noting that some limited
early engagement activity has already taken place.
• Insufficient time was built into the timetable to allow for the preparation and
submission of committee reports at key stages of the process;
• The sequencing of key stages (engagement, analysis, draft scheme development,
Economic Impact Assessment and reporting) was not fully reflected, resulting in an
assumption that elements could be progressed in parallel where, in practice, these are
more appropriately undertaken consecutively.  
Page 212

Page 213

4.6  Following ED&I approval on 10 March 2026 (para 16 of the draft minute refers) the draft
tourism strategy was subject to a 6-week public consultation. The final strategy is
scheduled to be presented to ED&I on 16 June 2026 for consideration.  This represents a
change from the timetable presented in December 2025, where approval had been
anticipated in March 2026. 
5.  PROPOSALS  
5.1  The development of the timeline options has been informed by updated Scottish
Government guidance, the sequencing requirements linked to the Tourism Strategy, and a
detailed review of the practical steps required to bring forward a robust and compliant
draft Visitor Levy Scheme.  
5.2  While two options are presented, it is recommended that Council proceeds with the
August 2027 timeline, as the options are not equal in deliverability or risk profile. The April
2027 option reflects a highly compressed and resource-intensive timetable which will
require budget for additional resource, with associated risks to quality, robustness, and
stakeholder confidence. In contrast, the August 2027 option reflects a more deliverable
and lower-risk approach, aligned with good practice and allowing sufficient time for
engagement, analysis, and evidence gathering.  
5.3  The two options for Council to consider are:  
5.4  Paper to be brought before Council on 7 April 2027.
This option enables a decision to be taken by the current Council so allowing members
with 5 years’ experience to decide whether to go to consult on the proposal; however, it
requires a significantly accelerated programme of work, with multiple stages undertaken
concurrently or at pace.  
5.5  The key delivery requirements include:
• Immediate commencement of consultation planning, marketing and promotional
activity.
• A minimum six-month public pre-consultation period (July 2026 – December 2026),
representing the shortest period set out in guidance and limiting the opportunity for
more extended or iterative stakeholder engagement.
• Concurrent analysis of pre-consultation feedback and preparation of the draft Visitor
Levy Scheme (November 2026 – early February 2027).
• Completion of an Economic Impact Assessment (EIA), informed by the draft Visitor
Levy Scheme within a compressed timeframe (January 2027 – early February 2027).
• Preparation of the committee report, which will require to be a late submission (March
2027).  
5.6  To achieve this timetable, the following constraints apply:
• Delivery of only the minimum 6-month pre-consultation period, limiting the depth and
breadth of stakeholder engagement.  
• Parallel processing of key stages, including analysis of responses, drafting of the
scheme, and commissioning of the EIA.
• Requirement to prepare a complex and potentially contentious report within an
extremely tight reporting window (March 2027).
Page 213

Page 214

• The timetable coincides with peak annual leave periods (summer and Christmas),
reducing internal staff capacity at key stages including consultation delivery, analysis,
and report preparation. This creates additional pressure on already compressed
timelines and increases reliance on external support to maintain progress.
• The compressed timetable limits the ability to extend or adapt the pre-consultation
period in response to stakeholder feedback, reducing flexibility in approach.  
5.7  The Economic Impact Assessment is a statutory requirement under the Visitor Levy
(Scotland) Act 2024, forming a critical component of any compliant proposal.  Under this
option:
• The EIA would require to be delivered at pace and is likely to rely on a desk-based
approach. 
• There is a risk that this could be perceived as an economic impact response, rather
than a robust, evidence-based assessment. 
• Undertaking EIA-related engagement in advance of, or alongside, fuller pre-
consultation risks creating a perception that a visitor levy scheme has already been
determined. 
5.8  This introduces a reputational risk that the process is a fait accompli, undermining
stakeholder confidence and increasing the likelihood of challenge.  
5.9  This option carries significant delivery and governance risks, including:
• Quality and robustness risk
The compressed timetable increases the likelihood that the draft scheme, supporting
evidence, and impact assessment are not fully developed.
• Engagement risk
The pre-consultation period coincides with the peak tourism season, reducing the
capacity of businesses to engage and increasing the risk of under-representation.
• Perception of pre-determination
Early EIA work and compressed engagement may undermine credibility of the process.
• Statutory compliance risk
The EIA may not be sufficiently robust to meet expectations for a proposal of this scale.
• Reputational and legal risk
Limited engagement and compressed analysis raise the risk of challenge to the
robustness of the process, particularly given the scale and potential impact of a visitor
levy.
• Inefficient use of resources
Undertaking the EIA before the draft scheme is fully developed may lead to duplication
or rework, representing poor value for money.  
• Political and governance risk
The proposal would be brought forward during the pre-election period, when there is
heightened sensitivity.
• Deliverability risk
The timetable is dependent on immediate mobilisation and sustained delivery at pace,
leaving minimal contingency for slippage at any stage.
Collectively, these factors increase the risk that the Council is asked to consider a
proposal which is not supported by a sufficiently robust evidence base.  
5.10  This option would require additional resource to be deliverable, including:
Page 214

Page 215

• Commissioned external support for: 
o consultation delivery and analysis (£50-£65k)
o accelerated EIA production (increased consultancy capacity) (£45-£70k)
o support with financial forecasting for levy income (£15-£20k)
• Additional internal staff capacity to manage parallel workstreams.
Funding would require to be identified (potentially through reserves such as the
Transformation Reserve, subject to agreement).
• TOTAL resource requirement: £110-£155k  
5.11  Should Council approve progression of this option, the following indicative
implementation timetable would apply:
• minimum 12-week public consultation of draft visitor levy scheme proposal
commences (April 2027)
• analysis of consultation responses, and consideration of any amendments to the draft
scheme. (July – August 2027)
• preparation of the committee report (September - October 2027)
• final Visitor Levy Scheme proposal presented to Council for consideration (November
2027)
• anticipated commencement of the statutory 18-month implementation period, should
the scheme be approved (November 2027)
• anticipated commencement of the Visitor Levy, should the scheme be approved,
reflecting the statutory minimum 18-month implementation period (June 2029)  
5.12  Paper to be brought before Council in August 2027.
This option would involve an important decision to be determined at an early meeting of
the new Council but reflects a more deliverable and robust approach, allowing sufficient
time for each stage of development to be undertaken consecutively.  
5.13  The delivery requirements include:
• Immediate commencement of consultation planning, marketing and promotional
activity.
• nine-month public pre-consultation period (July 2026 – March 2027), allowing for
broader and more representative engagement and greater opportunity to reflect
stakeholder feedback in developing the draft scheme.
• analysis of pre-consultation feedback and preparation of the draft Visitor Levy Scheme
(January 2027 – May 2027)
• completion of an Economic Impact Assessment (EIA), informed by the draft Visitor
Levy Scheme (March/April 2027 – June 2027)
• preparation of the committee report (June 2027)  
5.14  The benefits of this option
• Improved quality and robustness of the draft scheme 
• Stronger stakeholder engagement, reducing risk of challenge. 
• Delivery aligned with staff availability, reducing reliance on external support. 
• EIA undertaken at the appropriate stage, ensuring compliance and credibility. 
• Avoids pre-election timing, enabling consideration by a newly formed Council.
• This approach better reflects the scale and complexity of introducing a Visitor Levy
Scheme.  
Page 215

Page 216

5.15  This option carries the following risks:
• Potential for stakeholder fatigue over longer engagement period. 
• Delay to implementation and income generation, should the scheme be approved.  
5.16  The resource implications for this option include:
• Lower requirement for immediate additional resource. 
• Greater opportunity to manage within existing staffing capacity.
• External support (i.e. EIA - £25-£30k and potential support with financial forecasting for
levy income - £10k) can be commissioned in a planned and cost-effective manner.
• TOTAL resource requirement: £35-40k.  
5.17  Should Council approve progression of this option, the following indicative
implementation timetable would apply:
• minimum 12-week public consultation of draft visitor levy scheme proposal
commences (August 2027).
• analysis of consultation responses, and consideration of any amendments to the draft
scheme (November - December 2027).
• preparation of the committee report (January – February 2028).
• final Visitor Levy Scheme proposal presented to Council for consideration (March
2028).
• anticipated commencement of the statutory 18-month implementation period, should
the scheme be approved (March 2028).
• anticipated commencement of the Visitor Levy, should the scheme be approved,
reflecting the statutory minimum 18-month implementation period (October 2029).  
5.18  Committee dates beyond April 2027 will be agreed by incoming Members following the
May 2027 elections.  
5.19  Both timeline options are summarised in Appendix 1.  
5.20  Progress on Visitor Levy schemes across Scotland has been mixed, with several local
authorities delaying or pausing development to allow for legislative clarity and sufficient
engagement:
• Highland Council is due to consider a report on 25 June seeking agreement to
undertake further engagement on a Visitor Levy, with a subsequent report to be
brought forward recommending a proposed scheme for consultation. It should be
noted that Highland Council had previously undertaken pre-consultation and
consulted on a draft scheme between 15 November 2024 and 31 March 2025, with
progress subsequently paused.
• Perth and Kinross Council has agreed to proceed with a 12-week public
consultation on a proposed draft Visitor Levy scheme.
• Aberdeenshire Council undertook early engagement but has not progressed
further.
• A number of local authorities have yet to begin pre-consultation activity.  
5.21  Recent amendments to allow both percentage and flat-rate models introduce additional
complexity in scheme design, reinforcing the need for careful development and
stakeholder engagement.  
Page 216

Page 217

6.  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ✓ 
Policy and Legal ✓ 
Financial ✓ 
Risk ✓ 
Staffing ✓ 
Best Value and Transformation ✓ 
Property  ✓
Information Communications Technology/Digital   ✓
Equalities. Social Inclusion and Economic Impact   ✓
Climate Change and Biodiversity Impact  ✓ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
This proposal is in accordance with the Visitor Levy (Scotland) Act 2024. The Act requires
that any draft scheme proposal is supported by appropriate impact assessments,
including a statutory Economic Impact Assessment. The approach taken to developing the
proposal must therefore ensure that it is robust, evidence-based and capable of
withstanding scrutiny. 
The Council assesses support for economic development initiatives on their individual
merits, guided by the objectives of facilitating sustainable economic growth and achieving
the outcomes set out in the Ten-Year Plan and Corporate Plan.  
6.4  Financial
Page 217

Page 218

The upfront costs associated with progressing the preferred August 2027 option will be
met from the Transformation Reserve, subject to Council approval. Should a Visitor Levy
Scheme be approved and implemented, it is anticipated that income generated from the
levy will be used to reimburse these upfront costs, in line with the provisions of the Visitor
Levy (Scotland) Act 2024.
There are financial implications associated with both options.  At a meeting on 19
February 2025, Council agreed to allocate £15,000 to commission specialist expertise to
support Stage 1 of the development process of a visitor levy scheme (para 16 of the
minute refers).  The committee report also detailed that a further £15,000 from the
Transformation Reserve would be sought to proceed with the 12-week consultation. 
The legislation and associated guidance permit local authorities to recoup the costs of
establishing and administering a visitor levy scheme from income generated by the
scheme, should it be implemented. It is therefore anticipated that the set-up costs could
be recovered from levy income. However, if the scheme is not implemented, these costs
would remain a cost to the Council. 
Option if paper to be brought before Council on 7 April 2027.
Will result in higher upfront costs due to the compressed timescales required to
complete the EIA, alongside other consultation activities, which will require a more
intensive use of resources over a shorter period.  A desk-based EIA would include
analysis of existing data, basic modelling and scenario testing and could cost in the
region of £25-£35k. A more robust EIA including more detailed modelling and stakeholder
engagement could cost in the region of £60-£70k.   Consultation delivery and analysis
could cost in the region of £50-£65k.  These indicative costs will have to be confirmed.   
Option if paper to be brought before Council in August 2027. 
Likely to incur lower immediate delivery costs to complete the EIA due to the extended
timescales.  However, this must be balanced against the potential loss of income arising
from the delayed implementation of the Visitor Levy (by 4 months), should the scheme be
approved and come into force in October 2029 rather than June 2029. 
One off Costs:
Service
Area
Budget Budget
Years
Proposed
Spend this
Year
Virement
From
Other
Comments 
Option if
paper to be
brought
before
Council on 7
April 2027:
higher cost 
EIA –
2026/2027 
with some
spend
likely in
2027/2028 
Page 218

Page 219

£45-£70k 
Consultation
and Analysis
- £50-£65k 
Support with
financial
forecasting
for levy
income –
£15-£20k 
Option if
paper to be
brought
before
Council in
August
2027: lower 
EIA -        
£25-£30k 
Financial
forecasting
for levy
income -
£10k 
2026/2027 
and 
2027/2028 
Annually Recurring Costs:
Service
Area
Budget With
Effect
From
Annual
Net
Impact
Virement
From (if
applicable)
Other
Comments       
6.5  Risk 
Option if paper to be brought before Council on 7 April 2027. 
Option 1 reflects the minimum pre-consultation period, limiting opportunities for
meaningful engagement.  The consultation also coincides with the peak tourism season
which may limit business participation.  There is a risk of inefficiency in progressing the EIA
Page 219

Page 220

in tandem with early scheme development, as it is more appropriately informed by a
developed draft proposal.  Additionally, pressure to analyse responses and develop the
draft scheme within tight timescales increases the likelihood of oversight due to pace of
delivery and limited resources. 
The draft proposal would be brought before Moray Council during the pre-election period,
which presents a risk in terms of heightened sensitivity and reduced opportunity for full
political scrutiny and engagement. 
Overall, these factors increase the risk of reduced engagement, reputational impact, and
potential challenge to the robustness of the process. 
Option if paper to be brought before Council in August 2027. 
Option 2 presents risks associated with an extended pre-consultation period, including
potential stakeholder fatigue and reduced engagement over time.  The extended
timeframe would delay implementation of the Visitor Levy and any associated income
generation, should the scheme be approved, by a period of 4 months. There is a risk that
the new council will need more time to understand the implications of introducing a
Visitor Levy before taking a decision which could further delay the timeline or equally
decide not to proceed at all.  
6.6  Staffing 
Option if paper to be brought before Council on 7 April 2027. 
It is anticipated that additional resources beyond the 3-day allocation within one of the
Development Officer roles (Economy and Enterprise) would be required due to
compressed timescales. The additional requirements will be reviewed, and where
possible team workload rebalanced to manage demand.  However, consultation delivery
and analysis would need to be outsourced. 
Option if paper to be brought before Council in August 2027. 
It is anticipated that the extended timescales will be more manageable within the team’s
current resources.  Consultation delivery would still have to be outsourced but the
additional time will allow analysis of the consultation responses to be delivered by the
team. 
6.7  Best Value and Transformation 
Additional funding would be required to expedite the process, despite the possibility that
the final decision may be not to approve the implementation of a Moray Visitor Levy.  This
raises considerations in relation to best value and the proportionate use of resources.  
6.8  Property 
Nothing arising from this report.  
6.9  Information Communications/Technology/Digital 
Nothing arising from this report.  
6.10  Equalities, Social Inclusion and Economic Impact
Page 220

Page 221

The development of a Visitor Levy Scheme will require consideration of economic impacts
on businesses, visitors and communities. These will be assessed through the statutory
Economic Impact Assessment as part of the proposal development process.  
6.11  Climate Change and Biodiversity Impacts 
Nothing arising from this report. 
7.  CONSULTATION  
7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations, Service Manager Legal Services, Chief Financial Officer, Head of
Operations and Environment, Head of Growth, Planning & Climate, Service Manager
Democratic Services, Service Manager Economy and Enterprise and any comments made
have been incorporated into the report.  
8.  BACKGROUND PAPERS  
8.1   
Page 221

Page 222

Summary Table         Appendix 1 
To be delivered April 2027 committee option August 2027 committee
option
Pre consultation (public)
to inform draft scheme
July 26 – December 26
(6 months)
July 26 – March 27
(9 months)
Prepare the draft scheme November 26 – February 27
(4 months)
January 27 – May 27
(5 months)
Economic Impact
Assessment
January 27 – February 27
(1 month)
March/April 27 – June 27
(3 months)
Prepare committee
report March 27 June 27
Draft scheme presented
to Council April 27 August 27
Consultation on draft
scheme
April 27 – June 27
(3 months)
August 27 – October 27
(3 months)
Analysis of consultation
results
July 27 – August 27
(2 months)
November 27 – December 27
(2 months)
Prepare committee
report September – October 27 January 28 – February 28
Final scheme presented
to Council November 27 March 28
Implementation period  November 27 – May 29
(18 months)
March 28 – September 29
(18 months)
Scheme starts June 29 October 29
COST £110-155k £35-40k 
Page 222

Page 223

Report to: Moray Council Meeting Date: 30 June 2026  
Report by: Executive Director Economy, Enterprise and Operations  
Author: Michael Kelly Contact Email: michael.kelly@moray.gov.uk 
Subject: Moray Growth Deal 2025 Annual Report   
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1 To provide Councillors with a copy of the Moray Growth Deal’s 2025 annual report.    
1.2  This report is submitted is submitted to Council in terms of Section (II) (20) of the
Council’s Scheme of Administration relating to a new policy matter which does not fall
within the terms of reference of any Committee. 
2. SUMMARY  
2.1  A condition associated with Growth Deal funding is that a report is produced annually
providing an overview of work undertaken in the past 12 months, with a forward look at the
year ahead.  This paper introduces the annual report covering the 2025 calendar year,
looking ahead to activity planned during 2026.    
2.2 A draft version of the report was submitted and approved at the Moray Growth Deal (MGD)
Programme Board on 29 January.  Subsequently, comments were sought from the Moray
Economic Partnership (MEP), enabling a revised, final version to be approved by the MGD
Programme Board on 26 March.  In advance of the 30 June Council meeting, the report
was considered at the Community Planning Board on 3 June.  Appendix 1 contains a copy
of the 2025 MGD Annual Report.  
3. RECOMMENDATIONS  
3.1 It is recommended that Council considers and approves the 2025 Moray Growth Deal
annual report.   
Michael Kelly
Service Manager Growth Deal 
4. BACKGROUND AND CONTEXT
Item 14.
Page 223

Page 224

4.1  2025 has been a progressive year for the MGD.  Activity has become more visible, through
increased construction activity and service stand up preparations involving businesses
and citizens.  That said, the red / amber / green risk status (RAG) is a direct result of
challenges affecting 2 projects (a need to identify a replacement skills project and move
the South Steet regeneration site into delivery).  Collaborative work has taken place with a
range of partners including Government funders and it is anticipated that activity
undertaken during 2025 will result in the risk profile of the Deal decreasing in 2026/27
financial year (FY) (from red / amber to amber).    
4.2 A copy of the 2025 annual report is provided in Appendix 1 of this report.  Key
achievements listed in this include:   
Q4 24/25  Skills workshops held that identified potential proposals for a
replacement skills and innovation project.
 Tender for Elgin Town Hall construction published.
 Award of Elgin Science, Technology, Engineering and Mathematics
(STEM) Hub construction activity to Robertson (Construction) Ltd
Q1 25/26  Bus Revolution phase 2 services launched (northern coastal
communities), supported by a communication and engagement
campaign involving a leaflet drop a five week radio / digital
marketing campaign.  
 Legal process to vary the terms of the Cooper Park Trust Deed
started following the 25 June Moray Council decision. Work due to
be concluded in the second half of 2026.  
Q2 25/26  South Street site clearances (Housing Mix Delivery and the
Business Enterprise Hub) completed along with archaeological
excavations.
Q3 25/26  Grant Lodge design activity reached Royal Institute of British
Architects (RIBA) stage 3, with applications for planning and listed
building consent submitted.
 Contract signed between Taylor and Fraser and Moray Council, with
work on the renovation of Elgin Town Hall starting.
 Soft launch of ‘STEM Starts’ service with the first visitors shown the
Elgin Hub and the EY STEM Manager appointed.  
 Operator secured for the Manufacturing Innovation Centre for
Moray (MICM) facility (Elevator UK)   
4.3 Looking ahead to 2026, the scale of work will increase further through the delivery of new
services, existing and new construction activity progressing and the advancement of
planning for future new services.   
Q4 25/26  MICM building to be handed over to Highlands and Islands
Enterprise (HIE)
 Business Enterprise Hub project to enter delivery 
Q1 26/27  Start of construction activity at South Street (Housing Mix Delivery -
affordable housing and Business Enterprise Hub)
 Analysis of anonymised mobile data to develop headline
‘movement pattern’ insights across the region, informing the
development of phase 3 Bus Revolution expansion plans
 Completion of the first 39 affordable homes in Speyview, Aberlour.  
Page 224

Page 225

 Ministerial launch of the MICM service.  
 Paper to be submitted to Moray Council regarding next steps with
Grant Lodge.  
Q2 26/27  Electric Vehicle (EV) charging infrastructure to be installed to
support phase 3 rollout (Q1 2027/28 FY) of the Bus Revolution
project
 Digital Health project to end, with Board undertaking closure
activity.
 Operational model for the EY STEM service to be finalised
(including the opening hours of facilities and access arrangements
for different groups including the schools, nurseries and members
of the public), following evidence gathering from the first six
months of delivery.
Q3 26/27  Plans for phase 3 of the Bus Revolution project to be agreed prior to
implementation in Q1 2027/28.   
4.4 Whilst positive progress continues to be made, the Deal is currently managing a number of
risks and issues.  The most significant strategic entries are noted below.    
4.5 Programme:   
Area of focus Commentary  
Ensuring there is
sufficient capacity in
place to deliver Deal
activity. 
- Projects working on a case by case basis to understand
resourcing requirements beyond initial contractual
durations of Project Manager positions.  Change requests
being considered by the MGD Programme Board during
2026.  
- Need to generate clarity on what is required for post project
monitoring and evaluation activity and clarify who is
responsible for undertaking this.  
Identifying a
replacement skills
project
- Optimat worked during Q4 2025/26 to review options and
identify a recommended project vision.  This was advanced
to a Strategic Outline Case stage, which will now be the
subject of Council and Government review (Qs 1 and 2
2026/27).  Aim is for an Outline Business Case to be
prepared by the end of 2026/27 FY.  
With flat Government
funding, inflationary
pressures could affect
the ability of projects
to deliver some or all
of their outputs.
- Continued focus on cost, through the agreement of fixed
price agreements, use of cost consultants and
understanding fallback value engineering opportunities.  
- Projects to be aware of and explore external funding
opportunities. 
4.6 Project:     
Area of focus Commentary  
Stabilise and enhance
the revenue
performance of Bus
Revolution 
- Passenger numbers encouraging, but mainly concessionary
card users.  
- Team working to drive efficiency through Artificial
Intelligence (AI) simulation and mobile data trends for future
route development.
Page 225

Page 226

- Enhance targeted marketing activity. 
Income generation
levels for new services
varies from business
case projections.  
- Financial reports, board discussions and in-life reviews to
consider revenue costs and income.
- Peer to peer support between projects (MICM, Business
Enterprise Hub, Bus Revolution).
Funding shortfall
associated with Grant
Lodge
- Despite positive progress made during 2025, there remains a
funding shortfall of circa £2.4m.
- Whilst the Council will continue to progress opportunities
for further external funding, funding to support a
Development Officer within the Grant Lodge Trust should
provide opportunities to compete for funding sources not
open to the Council.
- 2 step procurement process will help develop a more robust
RIBA 4 vision for the facility with this process looking at value
engineering opportunities and the potential for phased
redevelopment.   
4.7 Looking at wider economic development activity taking place throughout Moray, it is
critical that consideration is given to how Deal activity interacts with other projects and
programmes, with a view to minimising risks and maximising benefits to be realised.  With
the Service Manager Growth Deal chairing the Moray Economic Partnership (MEP)
structural funds sub group, there is a forum in place that will drive collaboration across
key public agencies and track current and potential future activity to ensure clarity
amongst all parties.    
4.8 It is planned that during 2026 the MEP sub-group will look at significant activity taking
place to the east (Energy Transition Zone) and west (Inverness and Cromarty Green
Freeport) to ensure that Moray is positioned to support and benefit from these economic
growth initiatives.    
5. SUMMARY OF IMPLICATIONS  
5.1 The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  X
Financial  X
Risk  X
Staffing  X
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact   X
Climate Change and Biodiversity Impact  X 
5.2 Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Moray Growth Deal projects contribute to the Corporate Plan priority of promoting
economic development and growth, whilst meeting the LOIP vision of raising aspirations,
Page 226

Page 227

reducing inequalities in educational attainment, providing access to employment,
expanding choices for residents, and improving livelihood and well-being.    
5.3 Policy and Legal 
No new policy or legal implications. Each MGD project has been developed to meet local,
regional and national policy agendas in line with legal requirements where relevant.    
5.4 Financial 
The production of the 2025 Moray Growth Deal annual report in itself does not present any
financial implications, but it does contain a section relating to the finances of the
programme.     
With a tripartite agreement in place with the Governments for the provision of their
funding, the Council has committed to cash flowing peaks in spend.   
The Council’s Chief Financial Officer (Depute s.95 Officer) sits on the monthly MGD
Programme Board at which a report is submitted for review setting out spend against
budget allocation and takes an overview of the financial implications of the Deal. 
5.5 Risk 
The production of the 2024 Moray Growth Deal annual report in itself does not present any
risk implications, but it does reference risks being managed by the MGD PMO that have
the potential to affect successful delivery.   
Risk is a standing item at monthly MGD Programme Boards and is covered in meetings
that the PMO has with each Project Manager.    
5.6 Staffing 
None arising directly from this report.    
5.7 Best Value and Transformation 
None arising directly from this report.    
5.8 Property 
None arising directly from this report.    
5.9 Information Communications/Technology/Digital 
None arising directly from this report.    
5.10 Equalities, Social Inclusion and Economic Impact 
None arising directly from this report.  Equalities and socio impact assessments for each
project will be updated as part of full business case development and any subsequent,
significant change control activity.    
5.11 Climate Change and Biodiversity Impacts 
None arising directly from this report.  As part of their review process with the
Governments, Growth Deal projects need to take account of carbon and environmental
considerations in full business cases, with net zero aspirations being integrated into
design briefs for new properties.  
6. CONSULTATION
Page 227

Page 228

6.1  This report has been the subject of review by a number of consultees, including:   
- Executive Director for Economy, Enterprise and Operations,
- Head of Growth, Planning and Climate
- Chief Financial Officer
- Service Managers for Legal Services and Democratic Services 
Any comments made have been incorporated into the report  
7. BACKGROUND PAPERS  
7.1  Appendix 1:  Moray Growth Deal 2025 annual report 
Documents uploaded into CMIS (appendices to the annual report):
- 2025 follow up Moray Council internal audit of the Moray Growth Deal 
- Summary of 2025 audit of Manufacturing Innovation Centre by Highlands and
Islands Enterprise 
Page 228

Page 229

ANNUAL REPORT
Page 229

Page 230

Housing Mix, Dallas DhuPage 230

Page 231

Contents 
1.1     2025 achievements 
1.2     Key 2026 milestones 
Programme overview 
3.1.1     Summary of what the Deal is working to achieve
3.1.2     Status of Deal activity 
Project updates 
3.2.1 Bus Revolution
3.2.2 Business Enterprise Hub
3.2.3 Cultural Quarter
3.2.4 Digital Health
3.2.5 Early Years STEM
3.2.6 Housing Mix Delivery
3.2.7 MICM 
3.2.8 Skills and innovation project 
PMO milestones to be achieved
Factors that require action or future delivery could be impacted
Monitoring the benets to be realised by the Deal 
Funding sources for Deal activity
Government funding drawn down Q4 24/25 to Q3 25/26 
3
4
6
6
7
10
14
19
24
30
35
38
42 
46
47
48 
49
50
Page 231

Page 232

Structure of Moray Growth Deal activity and O cers involved 
Summary of assurance activity progressed during 2024
Summary of audit activity undertaken during 2025
Complying with report ndings from Scottish Parliament’s 
Economy and Fair Work Committee report on Growth Deal activity   
52
54
56
59 
Page 232

Page 233

Skills workshops held that identied potential proposals for a
replacement skills and innovation project.
Tender for Elgin Town Hall construction published.
Award of Elgin STEM Hub construction activity to Robertsons
(Construction) Ltd 
Bus Revolution phase 2 services launched (northern coastal
communities), supported by a communication and
engagement campaign involving a leaet drop and a 5 week
radio / digital marketing campaign.  
Legal process to revise the Cooper Park Deed started following
the 25 June Moray Council decision. Timescales are still being
conrmed, but it is hoped this work will conclude in the
second half of 2026.   
South Street site clearances (Housing Mix Delivery and the
Business Enterprise Hub) completed along with archaeological
excavations. 
Grant Lodge design activity reached RIBA stage 3, with
applications for planning and listed building consent
submitted.
Contract signed between Taylor and Fraser and Moray Council,
with work on the renovation of Elgin Town Hall commencing.
Soft launch of ‘STEM Starts’ service with the rst visitors shown
the Elgin Hub and the EY STEM Manager appointed.  
Operator secured for the MICM facility (Elevator UK)  
MICM phase 1 assets completed (central hub and incubator
units)
Page 233

Page 234

Ministerial launch of STEM Starts service 
Ministerial launch of Manufacturing Innovation Centre service
Business Enterprise Hub project expected to enter delivery
Commencement of construction activity at South Street
(a ordable housing and Business Enterprise Hub)
Analysis of anonymised mobile data to develop headline
‘movement pattern’ insights across the region, informing the
development of phase 3 Bus Revolution expansion plans
Completion of the rst 39 a ordable homes in Speyview,
Aberlour.   
EV charging infrastructure to be installed to support phase 3
rollout (Q1 2027/28 FY) of the Bus Revolution project
Digital Health project to end, with Board undertaking closure
activity.
Operational model for the EY STEM service to be nalised
(including the opening hours of facilities and access
arrangements for di erent groups including the schools,
nurseries and members of the public), following evidence
gathering from the rst 6 months of delivery. 
Plans for phase 3 of the Bus Revolution project to be agreed
prior to implementation in Q1 2027/28. 
Page 234

Page 235

2025 was a busy year for our Moray
Growth Deal. 
My expectation was that activity would
move from ‘behind the scenes’ work, to
being much more visible ‘on the ground’
and that is what we have seen. I’m
pleased by the e orts of all our project
teams as extensive steps have been
taken to advance planning, commence
construction activity and prepare for the
launch of new services.  Specically: 
I’ve had the opportunity to visit our
new STEM Hub in Elgin and learn
more about the service.
Taylor and Fraser has started work
on the transformation of Elgin Town
Hall and I look forward to seeing this
building being back in use during
2027.
I had an opportunity to spend time
with UKG Minister Kirsty McNeill to
see a powerful demonstration from
the Digital Health project of the need
that sits behind the applications that
are in development.  
The pace of Deal activity shows no sign
of slowing. As we look forward,
throughout 2026 I’m excited to see: 
Manufacturing Innovation Centre
services start from their new facility
in Forres, which will be run by
Elevator UK on behalf of Highlands
and Islands Enterprise. This will see
the Moray Growth Deal supporting
our manufacturing businesses,
helping them to innovate and grow
our economy.  
Construction activity starting at South
Street, despite the challenges faced
in the latter part of 2025.  
Articial Intelligence simulation that
will help inform the future shape of
m.connect services.
Alongside the optimism, it’s important
we have a laser focus on risks that may
a ect our ability to realise the full
potential of the Deal. Specically, as
services are stood up, teams need to
ensure revenue operating models are
continually reviewing data and getting
customer feedback to enable them to
operate as e ciently as possible. In
parallel, we need to determine next
steps with Grant Lodge, a building for
which a design and vision have been
prepared but that carries a nancial
shortfall. 
2026 is shaping up to be another busy
year, but one that will see Moray
residents and businesses becoming
even more involved in the
transformative projects being delivered.   
Moray Council Growth Deal Lead
Page 235

Page 236

All Moray Growth Deal activity has been developed based on the desire to realise a
number of ‘Pillars’.  These dene the local change sought and were developed
through extensive engagement with private and public sector partners when the
Deal was initiated in 2021. 
Improving transport (particularly rural transport within Moray),
driving digital collaboration and expanding the number of exports. 
Ensuring fair opportunity for
jobs, increasing skills and maximising productivity / competitiveness.   
The marketing of Moray to reference natural assets, the
attractiveness of the area for hospitality / tourism, quality of life / lifestyle
available, the cohesive community that can be found and the quality of the local
environment. 
Building on traditional strengths in
areas like food and drink, manufacturing and construction, but also looking at
growth areas such as renewables, tourism and aviation. 
In practical terms, the Deal is working to achieve the following targets for the
region:   
Direct and indirect creation of over 
will result
directly from Growth Deal projects
will be
attracted to Moray
will be constructed
will be supported
to scale, increasing Moray’s economic
productivity by £82m
Creation of new and improved
educational, cultural and business
innovation facilities
Page 236

Page 237

During 2025 project teams and the PMO have been working to advance delivery
activity, which has seen a signicant pulse of: 
Projects delivering for Moray, 6 of the 8 projects are at this stage.  
Construction procurement activity specically tenders for Elgin Town Hall,
Manufacturing Innovation Centre and Elgin STEM Hub.
Service start up and readiness work by Elevator UK (MICM) and STEM starts.   
In parallel, work has been ongoing to resolve challenges facing two of the Deal’s 8
projects: 
Following a series of workshops, engagement
has been undertaken with a wide range of prospective partners.  Consultancy
support is in place to advance proposals to a strategic outline case stage in the
rst half of 2026 (drafting and governance process).    
This
multi-partner regeneration of a city centre site involves UHI, Moray Council and
Robertsons Property Limited.  In late 2025 a Registered Social Landlord for the
housing element withdrew, with Robertsons working to advance discussions
with a replacement.  Parties are now working to complete all legal agreements. 
Project
complete and
being closed
Project in
delivery
Full business
case
Outline
business case
Strategic
outline case
Page 237

Page 238

Bus Revolution 
Business
Enterprise (BE)
Hub 
Cultural Quarter 
Digital Health 
Early Years (EY)
STEM 
Housing Mix
Delivery 
MICM 
Skills and
innovation
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
In progress
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
Complete 
In delivery
Complete
Complete
In progress
Scheduled
Scheduled
Expected
Q4 25/26
TBC
TBC
In delivery
In progress
Scheduled
In delivery 
In progress
In delivery
Complete
In planning
Scheduled
In delivery
In progress
Scheduled
In delivery
Complete
In progress 
In progress
Scheduled
Expected
Q4 25/26
Phase 1:  Speyside (by 2023)
Phase 2:  Northern coastal communities (by 2025)
Phase 3 (by 2027)
Phase 4 (by 2030)
Phase 5 (by 2031)
Phase 1a:  BE Hub facility opens (by 2027)
Phase 1b:  Service stand up (by 2027)
Phase 1:  Elgin Town Hall (by 2027)
Phase 2:  Grant Lodge (by 2029)
Phase 1:  Elgin hub, mobile service, outreach (by 2026)
Phase 2:  East, west & outdoor hubs (by 2029)
Phase 3:  Grant provision (by 2031)
Phase 1 (by 2027)
Phase 2 (by 2031)
Phase 1: MICM Hub and incubator units (by 2026)
Phase 2:  Grow on space (by 2028)
Pre-initiation milestone:  Draft SOC (by 2026)
Pre-initiation milestone:  Draft FBC (by 2027)
5 living labs to be tested and evaluated (by 2026)
Complete 
At an advanced stage 
Complete 
Complete 
Complete   
Complete 
Complete 
The Moray Growth Deal (MGD) is one of a number of transformational activities
taking place within the Council and with regional partners to deliver improved
outcomes for Moray. To ensure there is appropriate awareness of Deal activity,
progress updates are provided to the Council’s Transform Board, with the main
governance board being the monthly, multi-partner MGD Programme Board.
Page 238

Page 239

Page 239

Page 240

Phase 1 commenced in April 2023, phase 2 in April
2025.  Evaluation activity underway to inform
development of phase 3 which will go live in April 2027.
Increase the number of people using public transport to get
to and from rural areas for work, education and leisure.
(Capital: £4m SG)
The Moray Council
Bus Revolution is an innovative transport initiative designed to deliver a step
change in public transport availability across rural Moray. Building on established
experience, the project aims to signicantly increase the number of people using
buses to access employment, education, and leisure opportunities. Central to this
transformation is the introduction of a exible, demand-responsive transport (DRT)
service, supported by app-based technology that enables real-time journey
bookings in a user-friendly, ‘Uber-style’ format.
The project is underpinned by a £4.3 million investment, covering capital costs for
operational systems, branding, marketing, electric vehicle procurement, and the
installation of charging infrastructure to support a modern, e cient, and low-
carbon transport network.
By 2030, Bus Revolution aims to achieve the following investment objectives:
1. Increase public transport passenger journeys by 30,000 per annum.
2. Reduce environmental impact of transport in Moray by 30 tonnes CO e per
annum.
3. Achieve a 20% reduction in the number of people facing transport barriers to
employment, education, or recreation.
Key Stakeholders Involved:
Moray Council:  Project leadership and strategic oversight.
Transport Scotland:  Funding and policy alignment.
Regional Transport partner:  HiTrans, Funding and policy alignment.
GIS & Data Teams:  Data sourcing, mapping, and analysis.
Technology Providers:  Liftango, DRT platform and app development.
Local Communities & Passengers:  End users and contributors to service design.
Workforce Development Partners:  Supporting mobility for employment and
education.
Page 240

Page 241

Vehicle expansion
Delivery and integration of 6 electric vehicles into the core eet, supporting low-
emission operations across Moray 
Workforce growth
Recruitment of 8 additional drivers, enhancing service capacity and coverage 
Passenger growth:
Achieved 75,356 passenger journeys in Year 2 (2024–2025), up from a pre-
project baseline of 45,881 — a 64% increase
Notable growth in usage during early morning (0600–0800 hrs) and mid-evening
(1800–2000 hrs) periods, improving access to transport during previously
underserved times 
Digital transformation:
The passenger app became the dominant booking platform, with over 38,000
journey requests placed via the app
Telephone bookings decreased to 23,500 calls, down from 29,000 in the
previous year, indicating a successful shift to digital engagement 
Environmental impact:
Direct CO e emissions savings of 36.9 tonnes through EV usage
Indirect emissions savings of 34.7 tonnes CO e from increased bus journeys
replacing car travel 
Service enhancements:
Launch of new weekend services to improve leisure and social connectivity.
Strengthened marketing and communications, targeting specic user groups to
raise awareness and encourage uptake of services. 
* Risk rating – red, amber, green
Page 241

Page 242

Increased costs,
reduced revenue
income will make it
and harder to achieve
cost neutrality /
protability.  
Also applies to
commercially led
services and has the
potential to see public
transport services
reduced throughout
Moray.   
Any variance between
actual and projected data
used in the FBC nancial
model may impact the
Council's revenue
commitment required to
support the service. This
could a ect long-term
sustainability and
planning for evening and
weekend services. 
Services cannot be
deployed as planned,
delaying expansion
and preventing
achievement of
project objectives. 
Increased nancial
outlay for recruitment
and training. 
Monitor impact on
commercial
operators.
Engage with
Transport Scotland
to identify support
for rural services. 
Scenario planning
for revenue
shortfalls
Explore e ciency
measures (e.g.,
route optimization,
EV cost savings) 
Ongoing nancial
monitoring to
compare actual vs.
projected
performance. 
Ongoing review of
data throughout
2026 as phase 3
plan developed. 
Regular review of
vacant positions
Open adverts for
resilience sta . 
Make use of skills
transition pathway
created with DWP –
develop cat B
drivers into Cat D &
D1 where applicable
PTU structure and
recruitment strategy
may need review to
ensure sustainable
sta ng for future
phases. 
Continuing
changes in
operational  costs
/ revenue could
a ect protability
(National changes
to bus operator
funding for
concessionary
fares) and National
Insurance
increases for sta .  
Full business
case data
(passenger
numbers, fare
income etc.) may
vary from delivery
evidence. 
Failure to
recruit the
required number
of drivers and
support sta to
deliver the
operational model. 
Ongoing
monitoring
through 2026 
Q3 26/27 
Ongoing
through 2026 
Page 242

Page 243

In May 2025, Bus Revolution launched the m.connect 333 Service as part of Phase
2, marking a major step toward improving accessibility, reliability, and a ordability
of public transport in Moray.  Specically, the route services the Burghead,
Hopeman and Lossiemouth areas.  This agship initiative was designed to ll
critical gaps in connectivity for health services, childcare provision, and
employment access. Since its launch, the service has completed over 2,800
passenger journeys, demonstrating strong demand and immediate community
impact. 
The planning process involved route modelling, stakeholder engagement, and
policy alignment, ensuring the service was sustainable and responsive to local
needs. Collaboration with Moray Council’s Employability Team and childcare
providers helped shape the service to reduce transport barriers for working
families. 
Key highlights of the opening months of the service are: 
Immediate Uptake: Over 2,800 journeys in the rst ve months.
Cost Savings for Families: The service is addressing barriers to accessing pre
and after school care. Since launch, it has supported 1,819 pupil journeys,
enabling families to access childcare and out-of-catchment school transport to
Hopeman Primary.
Social Impact: Improved access to childcare and health services, enabling
parents to maintain employment and reducing nancial stress during the cost-
of-living crisis.
Policy Support: Aligns with priorities to reduce car dependency, promote
economic activity, and enable access to essential services. 
Supportive comments on the introduction of the service include: 
“m.connect has made
a substantial
di erence to the
amount we spend on
transport each term
to send our children
to school. Without
this m.connect service
we may have had to
consider whether
both my wife and I
could continue to
work full time.”
“The m.connect bus
service has meant we
now have access to
a ordable wrap-
around childcare
when we need it. This
has allowed me and
my husband to
continue working
from home, knowing
that the children are
happy and safe.”
“We are delighted
with the new
m.connect service
which is a great
saving on the
previous bus service
and allows for more
exibility by not
having to pay for a
whole term in
advance.”
Page 243

Page 244

A key characteristic of Moray is that it has over 3,000 small and medium sized
enterprises. This represents a considerable growth potential if these businesses
can be helped to scale-up. Supporting upskilling needs and growth aspirations, the
Business Enterprise Hub (BE Hub) will be a exible space for business innovation
that is accessible to businesses and students alike, providing an inspirational
environment that encourages entrepreneurial thinking.  It will be a:
Productive environment where learning spaces and real work environments
coincide.
Flexible space that seeks to drive collaboration between students, lecturers,
researchers, and practitioners.
Co-located space that will support Moray’s future entrepreneurs and their
workforce to develop.
The project’s investment objectives are therefore:
To improve business resilience, increasing the average business survival rate for
SMEs in Moray to 67% at 36 months in business by 2034 (according to ONS
gures).
To support 450 Moray-based SMEs to scale-up and achieve growth of 20% or
more in either employment, turnover, or social outcomes (dependent on
business model) year-on-year for at least two years, by 2036.
To attract, retain and develop skilled talent in the region so that the average
wage for full-time workers in Moray increases towards at least the Scotland
average, and the percentage of the population with NVQ3-and-above and NVQ4-
and-above qualications increases towards at least the Scotland average by
2034.
Capital:  £4.45m:  £3.3m SG, £1m HIE, £0.15m Pride in Place
funding 
Revenue: £3.35m:  £2m SG, £0.75m UHI, £0.6m Pride in Place
funding
UHI-Moray
Team working to resolve nal UHI Moray Board conditions
prior to entering delivery, estimated Q4 2025/26.   
Provision of education, research, and business support
functions to support new business start-ups, whilst helping to
upscale existing micro businesses.
Page 244

Page 245

To deliver at least 10 projects exploring entrepreneurship, business support
systems and digital capability in rural settings by 2034, contributing to
knowledge and innovations that can be applied in similar and analogous,
international environments. The proposed split would be 50/50 men/women
aimed at reducing the gender gap in STEM elds, with a focus on inclusivity
throughout. 
Collaboration is key to the BE Hub project, aiming to bring local business support
agencies along with UHI Moray and the wider UHI network together to work in
partnership under one roof, providing a joined-up o er that is responsive to local
business need. It is also collaborative in that it aims to develop a co-productive
delivery model that utilises the real-life business experience and expertise in the
region and beyond, involving established entrepreneurs in the design and delivery
of training programmes. 
Full Business Case (FBC) approval 
The BE Hub  Full Business Case received formal approval by the MGD Programme
Board and from the Scottish and UK Governments in February 2025.  Delivery will
commence once all UHI Moray Board conditions are met, with a primary focus on
the BE Hub Commercial Review. 
Conrmation of balance of revenue funding
In April, conrmation was received from the Elgin Pride in Place Board for £0.15m
in capital and £0.6m in revenue funding to support the BE Hub.  Combined with an
additional revenue contribution from UHI, the project now has a fully funded
operating model that supports the stand up and stabilisation of the service. 
Service recruitment
A recruitment review is underway in advance of the delivery phase.  Two critical
roles, the Academic Lead and Commercial Innovator, are embedded in the revenue
prole and will be appointed once delivery begins. From September 25, the UHI
Moray Deputy Principal took on the role of Academic Lead role in the interim with
a key aim to develop the Curriculum Plan for the BE Hub.  To build capacity during
the pre-operating phase (with these due to be expanded following the Hub’s
launch). 
A supply bank of lecturers and trainers is being established, starting with
expertise in Entrepreneurship and Innovation.   
A pool of Research Assistants with specialist skills has been created to support
research projects under the supervision of Research Fellows to advance
research and knowledge exchange activities in this eld.   
Page 245

Page 246

Curriculum development
Curriculum development for the BE Hub has begun within UHI’s Centre for
Business Enterprise and Innovation and will accelerate during formal delivery. The
Hub will o er CPD opportunities from short courses to doctoral-level study,
including leading UHI’s rst professional doctorate (a Doctorate in Business
Administration - DBA). 
* Risk rating – red, amber, green
Page 246

Page 247

Business Ent
Fixed price contract 
cannot be agreed until
the commercial phase
is complete and RIBA
stage 4 design signed
o .  
This has put a further
delay on the integrated
project sign o and a
delay on to the start of
the BE Hub
Construction phase. 
RIBA 4 design due to
be nalised late in Q4
2025/26.  This will
result in s a xed
price development
agreement with the
build contractor.   
All parties working to
secure a new RSL and
complete legal
documents.   
Q4 25/26 
Q4 25/26 
Capital
budget
allocation:  Build
cost higher than
capital budget in
place for the
project. 
Withdrawal of
RSL for the
South Street
Housing Mix
project.
Page 247

Page 248

As the Business Enterprise Hub (BE Hub) transitions toward formal project delivery,
curriculum development has commenced within the UHI Centre for Business
Enterprise and Innovation.  While unforeseen delays on the wider South Steet site
have slowed physical progress, they have not entirely prevented the process from
starting.  Planning for development is underway and will accelerate once formal
delivery begins and revenue funding becomes available. 
The current agship Continued Professional Development (CPD) course,
Responsible Leadership and Management for Contemporary Business, is now in its
sixth cohort.  Comprising three Level 8 modules, it targets business managers and
leaders seeking to develop ethical and sustainable leadership skills.  Co-designed
with a globally focused business partner, the course covers project management,
nance, sta motivation, organisational performance, and leadership theory.  Our
intention is to build on the success of the CPD programme, developing additional
modules and awards that focus on subjects such as the circular economy, and data
analytics & AI. 
Learning in the BE Hub will encompass a full range of continuing professional
development (CPD) opportunities, from 1-day CPD courses to doctoral-level study. 
UHI does not currently o er professional Doctorates, however the BE Hub will
drive forward such a development, working to establish a Doctorate in Business
Administration (DBA).  A UHI working group has been formed, and initial approval
documentation is in progress.  Led by the BE Hub Academic Lead, this will follow a
framework approach, enabling future expansion into sectors such as Engineering,
Education, Health, and Gaelic Studies.   
Footnote: At the time of nalising this report (May 2026) the Business Enterprise
Hub project has entered delivery, with agreements relating to the South Street site
having now been agreed.
Page 248

Page 249

The Cultural Quarter (CQ) project is regenerating two iconic, category B listed
buildings:  Elgin Town Hall (Phase 1) and Grant Lodge (Phase 2), both of which are
in Elgin.  The  aim is to create new spaces for recreation, community, culture,
heritage and tourism, acting as a catalyst for inclusive, place-based cultural
regeneration. Putting local people at the heart of these developments, whilst
increasing the region’s attractiveness as a place to visit, work and relax, the project
will drive inclusive economic growth and cultural expansion within the city and
wider region.
These vibrant new spaces will act as a springboard for cultural place-based
regeneration, providing opportunities for local people and visitors alike. The aim is
to enhance Moray’s cultural and evening economy, increase tourism, attract/retain
young people and talent/skills, and support the sector to thrive and grow.
The creation of modern t-for-purpose venues and a visible, aspirational cultural
centre in Elgin will encourage private sector investment in a new hotel at a
complementary site (Phase Three), meeting a longstanding requirement for
additional, quality, hotel accommodation in Moray.
The MGD is fully funding Phase 1 and seed funding Phase 2 through signicant
investments from the Scottish Government, the UK Government, Highlands and
Islands Enterprise (HIE) and Moray Council. External support for Phase 2 has been
pledged or is in a second phase of ratication / approval from Historic Environment
Scotland (HES), Elgin Pride in Place Board, Regeneration Capital Grant Fund (RCGF)
and the National Lottery Heritage Fund.  If all phase 2 applications are successful,
then the funding gap will have narrowed to £2.25m, with further work to be
advanced during 2026 to secure further nancial support. 
(Capital:  £12.84m SG, £4.1m UKG, £2m HIE, £3.9m Moray
Council and £1.65m from other funders)
Moray Council
In delivery.  Phase 1 construction underway.  External funding
to support phase 2 in progress
Investment in key local heritage assets, including the
refurbishment of Grant Lodge, Elgin Town Hall, and
investment in the region’s culture and tourism infrastructure
designed to leverage private sector investment in a new hotel. 
Page 249

Page 250

The project prioritises collaboration and community consultation and has been
developed in partnership with a wide range of stakeholders. These include: Elgin
Town Hall for the Community, Grant Lodge Trust, HIE, HES, Visit Scotland, Creative
Scotland, The Macallan Estate and the Third Sector Interface (TSI) Moray – who sit
on the project board and working group.  Additionally, the project works with a
group of Culture and Heritage and training / education partners including: Elgin
Museum, Elgin Cathedral, Elgin Library, Moray: Arts Development and Engagement,
Out of the Darkness Theatre Company, The Cabrach Trust, UHI Moray, Moray
School of Art, and Moray Pathways. 
Phase 1, Elgin Town Hall, is fully funded and works have started on site, due to
complete in Q1 27/28. The aspiration is to deliver phase 2, Grant Lodge, between
2027 and 2029. The realisation of phases 1 and 2 will leverage interest and
investment in the proposed third phase, the creation of a new town centre hotel in
Elgin. 
Phase 1:  Elgin Town Hall 
Elgin Town Hall for the Community (ETHC) decanted to Elgin Community Centre 
Principal Contractor, Taylor & Fraser, appointed to lead the redevelopment and
extension works at Elgin Town Hall.  Work commenced on site late 2025. 
Phase 2:  Grant Lodge 
Moray Council Councillors approve the Cooper Park and Grant Lodge Trust
Deed Variation petition, now underway
Cultural Quarter phase 2 working group established to support Moray Council
and Grant Lodge Trust to progress proposals and operational model for Grant
Lodge 
Grant Lodge Business Plan updated, with external funding either secured or
progressing to a second phase of review from Historic Environment Scotland,
Regeneration Capital Grant Fund, National Lottery Heritage Fund, and Elgin
Pride in Place Board 
Grant Lodge RIBA Stage 3 report complete and planning, listed building consent
applications lodged 
Project wide activity
Record attendance to Cultural Quarter buildings as part of Doors Open Day
2025
Cultural Quarter Project Manager gave a presentation and was a panel
participant in the  ‘Town and City Centre Regeneration: Re-imagined’ workshop,
part of the Scotland’s Towns Conference 2025 
Page 250

Page 251

* Risk rating – red, amber, green
Page 251

Page 252

Elgin Town Hall aerial view proposal
Picture courtesy of LDN Architects
The project is now
phased with phase 1
fully funded.  Phase
1cost increases and
failure to secure
su cient external
funding could mean all
or part of phase 2
cannot be delivered. 
May cause activity to
be curtailed / ceased,
which could impact our
ability to achieve the
outcomes desired.   
Work continually with
stakeholders to
deliver a successful
capital funding
campaign; work with
QS and design teams
to manage costs /
assess value
engineered options,
consider phasing;
analyse proposals
against deliverables
at key strategic
gateways 
Sub-group
established for
each phase to
manage
transitions,
operational/organi
sational
development
requirements and
revenue /
development
fundraising
Work with TSI
Moray and Culture
and Heritage
Network for peer
support and skills
sharing
Develop Action
Plans with HIE, TSI
and CSU 
Q3 25/26 
Ongoing 
The
available budget
through MGD
investment is
not adequate to
renovate both
buildings and
additional funds
must be
secured. 
Inability to
achieve revenue
proles as set
out in the full
business case /
business models
that have been
developed.   
Page 252

Page 253

During 2025 the project team worked with Elgin Town Hall for the Community, HIE
and LDN Architects, to transition the Town Hall from an operational community
facility to the commencement of major capital works to secure its future as
Moray’s leading arts and entertainment venue. 
In March 2025 major shows at Elgin Town Hall ceased and the charity Elgin Town
Hall for the Community relocated to Elgin Community Centre where they continue
to support community activities / small scale events for the duration of the capital
works. The contract for works at Elgin Town Hall was published via open tender. 
Following Elgin Town Hall for the Community’s relocation from the Town Hall the
project team undertook essential building investigations such as full demolition
and refurb asbestos surveys to plan for the works, and coordinated with SSEN to
relocate underground cabling that would have caused complications in the area
where foundations are due to be laid for the studio extension. The project team
then led a detailed Town Hall inventory review, ensuring everything needed for the
building re-opening is safely stored, and disposing of items which will no longer be
required. 
In July 2025 the project team appointed Taylor and Fraser as our main contractor
to redevelop, extend and re-imagine Elgin Town Hall.  A period of early contractor
engagement was initiated allowing our design team and professional advisors to
work with the contractor and agree nal details and costings for elements of the
design. The aim is to reduce overall risk in the contract. 
Moray Council signed the contract with Taylor and Fraser in October 2025, and the
contractor has now taken occupation of the site and construction activity has
commenced. 
Page 253

Page 254

The Rural Centre of Excellence (RCE) is a £5M UK Government–funded project
delivered by the Digital Health & Care Innovation Centre (DHI) as part of the Moray
Growth Deal. It aims to:
Build a rural focused digital health and care research and development (R&D)
ecosystem to drive economic growth
Develop scalable digital solutions addressing national health and care
challenges
Inuence academic and workforce development to meet future digital skills
needs
The RCE, in partnership with Health and Social Care Moray (HSCM) and citizens
with lived experience, is developing and testing innovative digital solutions to
support health, wellbeing, and independent living in rural communities. These
solutions aim to address service capacity challenges in Moray, with the potential
for national and international adoption, positioning the region as a leader in
shaping future health and care delivery.
You can nd out more about us and our work in Moray here:
www.dhi-scotland.com/rce-moray-hub
(Capital:  £5m UKG)
Rural Centre of Excellence (RCE) for Digital Health and Care
Innovation
Project in delivery and at an advanced stage.  Due to compete
in July 2026.
Creation of an anchored demonstration and simulation
environment (DSE) and Living Lab testbeds for the Moray
region.
Page 254

Page 255

The project consists of a series of ‘living labs’, which are focused periods of work to
develop digital applications for specic health care relates issues.   
Stakeholder involvement is central to the success of the RCE. The Digital Health &
Care Innovation Centre (DHI) leads delivery in partnership with H&SCM, NHS
Grampian clinical teams, Moray Leisure Centre, and Quarriers Moray Carers
Service. Universities and colleges, including UHI Moray, contribute
academic expertise, while citizens and community organisations provide lived
experience to ensure solutions are relevant and inclusive. Industry partners further
support innovation and scalability, creating a collaborative ecosystem that drives
meaningful change for health and care in Moray. 
1
2a 
2b 
3
4
5
Supported self
management 
Long term condition
management 
Community
Occupational
Therapy (OT) 
Care in place 
Smart housing /
communities 
Mental wellbeing 
Tackling obesity through preventative
approaches, connecting citizens to tailored
information and support to reduce risks such
as high blood pressure and type 2 diabetes. 
Supports people with type 2 diabetes to stay
well by connecting them to the right services
at the right time. 
Addresses long waiting times for OT
assessments by developing tools to support
selfmanagement and quicker access. 
Testing Community Connections Moray and
personal data store with unpaid carers in
Forres and Lossiemouth. 
Developing proactive Technology Enabled Care
(TEC) using sensors and data analysis to detect
early changes and reduce hospital admissions. 
Expanding mental health resources and digital
bundles to Community Connections Moray
and testing eMoodie – an early detection
platform with sta .
Page 255

Page 256

Over 20 research and development (R&D) simulations have been progressed to
date
2 core infrastructure assets are being tested in Moray (community connections
and the personal data store), with further investment and R&D activity in 2
other Scottish Health and Social Care Partnership (H&SCP) 
5 living labs have been activated and are at various stages of the innovation
process
1 R&D pathway has transferred to business as usual nationally through the right
decision service 
4 micro credential modules titled digital essentials for carers have gone live via
UHI Moray, with a further 4 currently being developed
A project has been initiated to develop a digital blueprint of international
signicance for future smart homes, incorporating design, construction and
digital in partnership with Build Environment-Smarter Transformation Scotland
(BE-ST) and HMD 
Over £2m in R&D additional funding directly leveraged into Moray. 
At least 12 new jobs to date have been activated due to the RCE R&D activity. 
Page 256

Page 257

* Risk rating – red, amber, green
Page 257

Page 258

Figure 2: Professionals Pathway
It has become evident
that over the last 2
years the Universities
and Colleges in
Scotland are nancially
constrained which is
making it harder to
create spin out
companies, which
could impact on
economic KPIs 
As a small local
authority, there is
limited economic
development capacity
available to fully
support this, but
collaboration is taking
place between key
partners to support
requirements around
local SME growth,
creating business start
up opportunities, and
attracting inward
investment in terms of
job creation in the
region.
RCE will use the
Health Frontiers
project to assist in
developing a stronger
network of support
for start-up and spin
out companies over
the remaining period
of the MGD
timeframe (up to
2031), in addition to
the BE Hub to
support these and
SME growth. 
An experienced local
consultant has been
contracted to create
and initiate a
roadmap to develop
an industry cluster
ecosystem in the
region. A local
oversight group will
be stood up to bring
key Moray
stakeholders
together to support
its implementation
and facilitate a series
of local events. 
Ongoing 
July 2026 
to RCE
economic KPI
achievement
due to limited
start-up/spin out
opportunities
with colleges
and universities 
to RCE
economic
development KPI
achievement
due to limited
economic
agency support
in the region 
Page 258

Page 259

The focus section for this year is on Living Lab 1 (supported self management) and
Living Lab 2 (Long term condition management), specically work taking place
within Moray Leisure Centre.  The piloting of the digital applications has led to
further R&D funding for 7 pathnder projects across Scotland, ahead of the
multimillion national obesity funding that is being positively progressed (DHI has
been selected for interview). These positive outcomes have arisen from the
approach developed and tested at Moray Leisure Centre with the main features
being: 
Creation of the heart of Moray wellness community in partnership with NHS
Grampian and the leisure industry
Targeted comms has attracted an at-risk community into a wellbeing service
with a focus on early intervention and prevention i.e. those with a high BMI, and
at risk of type 2 diabetes 
Successfully testing the concept of citizen willingness to nancially invest in their
wellbeing through leisure centre membership 
Technical infrastructure allows user data to be collated via the community
connections app such step count, calories consumed etc., Recent technical
developments to be tested in the next phase include a leisure centre and a
clinical NHS interface that enables access and interaction between the service
and the user through consented access via the PDS 
Brings additional capacity to support with management, and directs nite
clinical services to those most in need with sta and user e ciencies and
satisfaction enabled through asynchronous capabilities 
Creates a new revenue stream and jobs for the leisure industry 
Page 259

Page 260

The Early Years STEM project will invest £6.4m in STEM education in Moray, with
Moray Council committing £2.9m (£1.3m in capital and £1.6m in revenue), and the
Scottish Government committing £3.5 million (capital).
The project aims to encourage young people to enter a STEM related career when
they leave education through focusing on STEM engagement with children in their
early stages of learning (age 3-8). The project will develop a STEM learning
ecosystem in the Moray area, through the creation of specialist learning
environments and experiences, access to training and resources, and the creation
of a learning network involving key delivery partners, upskilled sta , and
volunteers from industry and the wider community.
Early Years STEM aims to inspire and enhance the learning experience of children
and sta through age appropriate, curriculum aligned and industry related STEM
experiences.  It will also ensure the o ering is accessible to parents, employers,
and the wider community, thereby allowing inter-generational learning to take
place. The aspiration of this strategy is to close the equity gaps in participation and
attainment in STEM, leading to more young people choosing STEM occupations at
a later stage in their lives. 
(Capital:  £3.5m SG, £1.3m Moray Council. 
Revenue:  £1.6m Moray Council)
Moray Council
Full business case approved during Q3 24/25 and the project
has entered delivery.  RAG is due to the construction activity
and the associated nancial draw down likely to slip from
24/35 FY into 25/26024.
To raise the aspirations of children age 3-8 in Science,
Technology, Engineering and Maths (STEM), and to grow the
STEM talent pipeline to ensure Moray is resilient in the future.
Page 260

Page 261

State-of-the-art STEM learning centre hosted within Elgin
library.
Mobile facility tted out with equipment that can be
transported to and used in any suitable venue.
Outreach o ering, consisting of a repository of STEM
resources.
Comprehensive learning programme aligned to the
Scotland’s Curriculum for Excellence. 
Two satellite STEM hubs in the west and east regions of
Moray, to enhance the reach of engagements.
Environmental sciences and outdoor STEM learning
centre, developed and delivered in partnership with a
local environmental charity and focusing on learning for
sustainability. 
STEM Grant Scheme to support partnership activity and
community focused STEM programmes.
Budget to update and refresh equipment.   
The project will deliver a comprehensive package of investment that includes: 
Page 261

Page 262

STEM Starts brand has been launched, to provide clear signposting of what the
project o ering is.
STEM Starts Discovery Centre, Elgin (adjacent to Elgin Library) has been
completed, with nursery and school visits due to commence in early 2026.  
Outreach van has been delivered and branded.  Activity has begun to lend STEM
kits and play equipment, purchased through the project, to early learning and
childcare settings within Moray.
The STEM starts website has been created, with a planned go live date of early
2026.
Recruitment of a STEM starts Development Manager has been completed, who
will lead the delivery of STEM starts learning activities in Moray (recruitment of
further STEM starts sta will follow in early 2026. 
* Risk rating – red, amber, green
Page 262

Page 263

Inability to realise
outreach and centre
activities. 
Project delay or failure
to deliver phase 2
developments as
planned 
Improvements in STEM
attainment levels not
realised. 
Potential to impact the
outcomes and benets
of the project.
Make activity attractive
to funding
opportunities 
Grow STEM
partnerships
Develop a network:
volunteers and
industry 
Engage legal
support at an early
stage 
Develop
partnership
agreements.
Engage community
early and ongoing 
Identify barriers to
participation 
Flexible and
dynamic approach
to curriculum
development and
project delivery.
Ongoing
assessment of skills
need with
education sta ,
young people 
Map STEM centre
locations and
schools within
Moray.  
Incorporate
ndings as part of
shaping phase 2
deliverables and
milestones 
Q4 27/28 
Q3 26/27 
Ongoing 
Ongoing
Insu cient
operational
planning and
budgets.   
Inability to
acquire sites or
secure strategic
partnerships 
No change
in community
attitudes or
regular repeat
visitations to
STEM centre
infrastructure. 
Cost of
transporting
children and
carers / teaching
sta to centres
make trips
prohibitive 
Page 263

Page 264

STEM Starts helps young children explore Science, Technology, Engineering, and
Mathematics through engaging, age-appropriate experiences. Early exposure to
STEM fosters curiosity and builds strong foundations for future learning, increasing
the likelihood of success in these subjects. This approach opens diverse career
pathways and equips children with the condence and skills to solve real-world
challenges. 
The STEM Starts learning network is a collaborative way of working, with the child
at the centre of it all, and is made up of the following elements: 
Dedicated STEM Centres o ering interactive, hands-on activities for children. 
Mobile Outreach Service bringing STEM experiences to communities across
Moray. 
STEM Lending Library providing kits and play equipment for schools, ELC
settings, and community groups.
STEM Learning Programme with curriculum-aligned lesson plans, resources, and
training videos for educators. 
Family Engagement initiatives encouraging parents to support STEM learning
through play and exploration. 
Specialist STEM Coordinators to lead activities, assist educators, and train
volunteers. 
Partnership working with local community groups, libraries, and charities to co-
create STEM learning experiences. 
Industry Collaboration to shape STEM learning opportunities and prepare young
people for future careers. 
Page 264

Page 265

(Capital: £5m SG, £2.5m Moray Council)
Moray Council
The full business case was approved during Q4 23/24 and the
project has entered delivery.
Stimulating housing development in town centres, unlock
constrained sites and promote the integration of pilot
exemplar sustainable design and construction techniques.
The Housing Mix Delivery is a £7.5m project with a commitment of £5m from the
Scottish Government and £2.5m from Moray Council. The project will support the
delivery of:
At least 360 a ordable houses and plots
150 short-term construction jobs annually
Private housebuilding by reducing constraints that will enable the construction
of at least 500 market houses
Browneld site regeneration
Provision of housing in rural towns and villages
Speyview, Aberlour
Page 265

Page 266

Enabling works started on the 6 Jan 2025 and all ve buildings have now been
demolished. 
All ground conditions are now established, archaeological evaluations complete
and initial drainage work undertaken.
During the demolition, items from well-loved Elgin venues were saved such as
the Newmarket bar sign, the McEwan’s Sign and the Jailhouse Nightclub electric
chair. These items were put up for auction by Robertsons Property Limited with
all £1649.18 of the proceeds going to Elgin Children’s ward. 
Planning approval granted in March 2025 and lead developer agreed. 
Masterplan complete. 
Construction underway with 30 units due for completion in Jan 2026, 9 units due in
March 2026 with phase 2 completion forecast for 2027. 
* Risk rating – red, amber, green
Page 266

Page 267

The broader Dallas Dhu project is an innovative collaboration between Moray
Council and Altyre Estate, with Grampian Housing Association and the Glasgow
School of Art. Fraser/Livingstone Architects were awarded the contract in 2023 to
design phase one of the Dallas Dhu housing development. This consists of 24
a ordable homes, 40-bed student accommodation, custom build housing
opportunities (4 serviced plots) and a housing innovation area. 
Moray Council is taking lead on the housing innovation area, made up of 6 plots set
within the site. The aim is to create a new neighbourhood of homes knitted into the
immediate landscape setting, that helps to foster a renewed sense of community and
belonging.  The primary ambitions for the housing innovation area are: 
Localism:  Seeking to source as many materials as possible from the local area
and using local suppliers wherever possible.
Materials:  The project aims to use locally sourced timber (if possible, from
Altyre Estate) and more broadly, try to build the homes without using any
concrete or cement or plastics/polythene layers that are now so prevalent in
modern construction, by using natural bio-based materials wherever possible.
A ordability:  The intention is to deliver the two homes based on the “average
price” for the Moray area and the remaining plots will be sold as serviced plots. 
Work is currently underway on the mini masterplan for the housing innovation
area which will be submitted for planning approval in 2026. 
Delay to the construction
start date until a new
RSL is conrmed. This
has a knock on e ect to
the start date of the
Business Enterprise Hub. 
Opportunities and
benets unable to be
realised. 
Discussions are
progressing with new
RSL partners, with
condence a new
partner can be
onboarded.   
Continued close
working with DHI to
incorporate
ambitions into HMD
Phase 2 sites and
other projects being
developed. 
Q1 26/27 
Q3 26/27 
The
Registered  Social
Landlord (RSL) for
South Street pulled
out of the project
in late 2025. 
Outputs from
the DHI Smart
Housing Living Lab
are unable to be
accommodated in
the Dallas Dhu
project.
Footnote: At the time of nalising this report (May 2026) , agreement has been
secured for a new Registered Social Landlord (RSL) to partner on the South Street
site.
Page 267

Page 268

Opening in early 2026, the Manufacturing Innovation Centre Moray (MICM) will
build on Moray’s manufacturing strengths, providing a hub for support and advice
to companies locally and across the Highlands and Islands.
MICM will function as a focal point for manufacturing businesses, providing
assessment and diagnostics of business need, advice, information, signposting and
brokerage, along with routes to various funding and nance sources. Its primary
focus will be on stimulating innovation and growth in product and process
development, with a strong emphasis on transitioning to low carbon practices.  It
will:
Play an active role in advanced manufacturing (multi-sector)
Provide services that are customised to the needs of rural manufacturing
businesses
Support manufacturing businesses to develop detailed assessments and
baselines of productivity and net zero performance
Co-ordinate service delivery and guide/steer businesses to the best solution for
them and the most suitable providers (for example the National Manufacturing
Institute for Scotland, NMIS, Scottish Manufacturing Advisory Service, SMAS,
Interface, Business Gateway, and other service providers)
Support businesses to innovate their processes and products and adopt new
technologies leading to improved productivity and protability
Unit 9 at Enterprise Park Forres has undergone a construction refurbishment
throughout 2025 to transform it into a state-of-the-art manufacturing innovation
centre. The new hub includes:
Incubation space for start-up and young businesses
Demonstration facilities showcasing advanced technologies and equipment
Meeting rooms and hot desk space
(Capital:  £0.61m SG, £2.442m UKG, £2.557m
HIE. Revenue:  £1.25m SG)
Highlands and Islands Enterprise
In Delivery Stage.  Phase 1 services launching in 2026, with
Elevator UK appointed as the service operator.  
A focal point for manufacturing businesses to learn best
practice and collaborate to stimulate the creation of new
processed, products and growth of existing manufacturing
businesses throughout Moray.
Page 268

Page 269

In October 2025, HIE appointed Elevator UK as the MICM service operator, to
design and deliver the operational activity.  Elevator has entered a 6-month
mobilisation and business consultation phase, with full-service launch planned for
spring 2026. 
The MICM project continues to be on track to realise the following key objectives: 
To increase Business Enterprise, Research and Development (BERD) in Moray’s
current manufacturing companies.
To increase growth, productivity, and e ciency in Moray’s manufacturing
companies.
To increase the number of manufacturing start-ups in Moray.
To attract manufacturing inward investment to Moray. 
In January 2025, a MICM learning and best practice visit took place to the
following three Somerset Council Innovation Centres:  
o Firepool Centre for Digital Innovation (FCDI)
o The iAero Centre - aerospace and associated high-value design and
engineering technology.
o Somerset Energy Innovation Centre (SEIC) 
Capital construction work on the MICM hub completed. 
MICM Service Operator procurement undertaken from April to Sept 2025 
MICM Service Operator contract awarded to Elevator UK, and commenced Oct
2025 
Facility Management contracts awarded throughout summer/autumn 2025 
* Risk rating – red, amber, green
Page 269

Page 270

Could result in a
revenue shortfall for
the project, reducing
the project viability
long term 
Impacts the range of
equipment and
software able to be
purchased 
Vision for MICM
diverges from what the
business community
would like to see.
Evaluated by
sensitivity analysis in
FBC - impact at <20%
is regarded as
moderate. 
Will be monitored
and reviewed
throughout delivery
stage 
The equipment
strategy is currently
being developed by
Elevator with support
from HIE, it is
expected to focus on
equipment and
software to support
digitisation. Work is
ongoing to identify
elements of
equipment related
spend that can be
capitalised. 
Consultation events
with the Moray
Growth Deal partner
organisations,
Chamber of
Commerce and
ongoing programme
of sector/subject
events.  MICM Project
Board to continue to
have cross sectoral
private sector input.
Review early
26/27 and
ongoing
throughout
project term 
April 2026 
Ongoing
throughout
Project term 
Revenue
assumptions in
the nancial
model  are over
optimistic 
The
equipment
budget is capital
only. There is a
risk that
elements of
equipment and
technology
acquisitions
such as software
cannot be
capitalised 
Lack of
productive
engagement
with the
business
community.
Page 270

Page 271

In 2025 MICM successfully met its milestone to appoint a Service Operator to
design and deliver the MICM service. 
To ensure the service was designed appropriately and to reach a successful
procurement outcome, HIE undertook market engagement and learning through
the following routes: 
Learning visit to Somerset Council, which is delivering a network of innovation
centres and wrap-around innovation support services for businesses in
Somerset’s key growth sectors.
Prior Information Notice (PIN) on Public Contract Scotland (PCS): this enabled
HIE to evaluate the market and gather feedback and intelligence, resulting in 7
detailed responses from the market. 
The learnings gathered provided views and input into areas such as equipment
strategy, mobilisation period, length of contract, pricing structure and the service
scope.  The information then informed the development of the scope of services
tender documents for the service operator procurement. 
Procurement was undertaken throughout spring and summer 2025, with Elevator
UK successfully appointed in October 2025. 
Elevator UK is one of Scotland’s leading social enterprises for enterprise and
business support, specialising in creating opportunities for growth, innovation and
meaningful impact.  It has a nationwide reach with in-depth knowledge and
experience of the manufacturing and innovation landscape and is well connected
to networks and partnerships which will support, enhance and complement the
MICM service. 
Elevator UK is perfectly placed with the skills, experience and knowledge needed to
design and deliver the MICM service.   With Elevator having been appointed in
October 2025, it is currently working through a 6-month mobilisation plan which
consists of recruitment, business and sector engagement, service design and
devising the equipment strategy.  MICM full-service launch is planned for Spring
2026.
Page 271

Page 272

Project in development. Working to draft a strategic outline
case for the funding by mid 2026. 
To generate a vocational and academic pipeline of skills
needed to help Moray employers grow.
Skills development is a key strand of the Moray Growth Deal.  There is a desire to
create a multi-facetted pipeline of vocational and academic courses that provide
skills needed to help our businesses to innovate and grow. 
Workshops held have helped identify that any future project should support skills
development in the energy, engineering or healthcare space, with further work
expected throughout the rest of 2025/26 and then throughout 2026/27 nancial
year to move a viable proposition through the business case development process
and into delivery. 
Completion of workshops to dene and advance thinking on future skills activity.
Procurement of consultancy support to review proposals and to bring a project
vision to strategic outline case stage. 
Skills and innovation project
(Capital: £21m UKG)
To be conrmed
Page 272

Page 273

* Risk rating – red, amber, green
Page 273

Page 274

Inability to advance a
signicant strand of
the Deal, with concern
that this funding could
remain unspent.   
Service start up less
resilient 
Multi-partner work in
progress to develop
project proposals. 
Aim is to identify early
if there is a risk
existing proposals
cannot advance, with
a view to identifying
alternative proposals.  
Aspiration for
business case
development process
to take place during
2026/27 nancial
year.   
Ongoing work with
Government funders
to determine if
revenue funding can
be sought for the
project. 
Extensive service start
up planning. 
Interim
milestone of
March
2025/26 to
have reviewed
proposals and
developed a
vision
statement for
the proposed
new project. 
Ongoing 
Failure to
identify a
replacement
skills project for
the Deal. 
Only
capital funding
is available
The skills element of the Moray Growth Deal attracts £21m of investment from the
UK Government (all capital funding), with the aim that any project delivers not just
skills development but innovation activity as well.   
At the end of 2024 and into 2025 a workshop process was run that involved a
range of di erent organisations and sectors, including: 
Academic institutions who undertake activity within Moray or in close proximity
Moray Council elected members
Bodies who represent Moray businesses
Moray businesses 
Page 274

Page 275

Public organisations with an interest in supporting and progressing skills and
innovation activity in the region 
The workshop series was developed in conjunction with the Scottish Futures Trust
(SFT) and aimed to achieve the following:                         
Subsequently, consultancy support has been procured and work will be delivered
during Q4 2025/26 to: 
Review 2 highest ranking proposals.
Consider how other potential partners could support the project, with
discussions held with a number of academic providers following the workshop
process.  
Consider the wider strategic landscape and other partners who may be able to
support the successful delivery of Deal outcomes, with the aim of developing a
vision for how the funding should be utilised.
Developing a strategic outline case (SOC) which is the rst step in the UK
Government’s Green Book methodology that Growth Deal projects need to
follow.   
Work being progressed will align with the May 2025 Regional Transformational
Opportunities report published by Highlands and Islands Enterprise and outputs
from the Moray Skills Summit held in December 2025.   
Dene the need for
investing in skills
infrastructure in Moray. 
Develop criteria against
which potential
opportunities would be
appraised 
Identify priority sectors
and potential options that
can be considered. 
Screen potential options
against criteria to identify
a prioritised list.
Workshop attendees rea rmed that the funding
should be allocated for skills development, given
the critical role it can play in underpinning wider
programme objectives relating to business
growth and helping to attract / retain people in
Moray.   
A series of objectives for a future skills project
were identied that focused on collaboration,
people development, economic growth, standing
of Moray and resilience.   
After reviewing a wide range of sectors, the
group identied energy, engineering and
healthcare as priority areas of focus.   
Potential proposals were considered and ranked,
with the 2 highest options recommended for
progression into a more detailed development
phase.
Page 275

Page 276

The PMO expects to deliver the following milestones during 2026: 
Growth Deal annual conversation with the Scottish and
UK Governments 
Programme level change activity to secure approval for
the replacement skills project: 
Drafting of a strategic outline case
Secure MGD Programme Board, Moray Council and
Government approval. 
2026/27 grant o er letter to be agreed with the
Scottish Government, conrming the level of funding
to be provided during the nancial year.   
Publication of the Deal’s 2025 annual report. 
New Scottish Government benets realisation
guidance to be reviewed, with an action plan
submitted to the MGD Programme Board for approval. 
Report to Council that updates Elected Members on
progress made securing additional funding for Grant
Lodge and the outcome of RIBA 3 design stage activity,
with the aim of securing agreement on the way
forward for the building. 
Schedule of in-life reviews of project activity 
Page 276

Page 277

Extracted from a November 2025 risk review paper that was considered and
approved by the MGD Programme Board, the following entries were identied as
requiring focused attention during 2026:   
Plan to be approved by the Board for medium to
long term resourcing requirements (project and
programme activity).
Generate clarity on what is required for post
project monitoring and evaluation activity and
clarify who is responsible for undertaking this. 
Support from nance colleagues to brief relevant
projects on expectations around revenue
forecasting and reporting.  
Peer to peer support around commercial / income
generation activity both internally within the
Council and relevant external organisations.   
Support from procurement regarding contract
management arrangements to monitor delivery.
Continued support from professional advisors
used to help Growth Deal Project Managers /
support Project Board meetings. 
Project Managers use of both the Project and
Programme assurance processes.
Continued use of the in-life review process during
2026.   
Board (led by Finance) to review measures in place
to foresee, plan and mitigate any potential
variances (overspend or underspend) in nancial
proles.  
Scrutiny of spend proles by Finance Teams
(monthly or quarterly) and use of professional
advisors to review project costs. 
Page 277

Page 278

A key requirement of Growth Deal funding is the need to e ectively monitor the
realisation of benets associated with the investment being made.  There are two
di erent lenses this work can be viewed through: 
In May and November each year the MGD Programme Board considers updated
plans from the projects that are in delivery.  In November 2025 a draft plan for the
Business Enterprise Hub was submitted, with an expectation that by the May 2026
review, 7 of the Deal’s 8 projects will be in delivery.   
Whilst it is positive Project Managers are updating plans bi-annually, the PMO has
identied a number of steps that can be taken during 2026 to strengthen activity,
namely:   
Introduction of a dashboard to summarise the status of activity.
Trend data to indicate whether entries in plans are on track, ahead of schedule
or if remediation activity is required.  
Greater logic ow awareness of how the status of outputs will contribute to the
delivery of outcomes. 
The aspiration to develop a revised programme level benets realisation plan
during 2025 was curtailed by a number of factors including: 
Continued uncertainty regarding the direction of the skills project, which
accounts for 32% of the total government investment in the region. This is
expected to be seen during Q4 2025/26.
Awareness that updating the plan in 2025 could have the potential to be
superseded following the release of updated benets guidance from the
Scottish Government which is scheduled for Q4 2025/26 / Q1 2026/27. 
The expectation is that the PMO will develop an action plan during Q1 or Q2
2026/27 depending on when Scottish Government guidance is released, setting out
how the PMO will work to enhance both the benets realisation plan and secure
evidence needed to determine the impact activity will make against key outcomes.   
Page 278

Page 279

Bus Revolution
BE Hub 1
Cultural Quarter
Digital Health
Early Years STEM 
Housing Mix Delivery
MICM
Skills 
Bus Revolution
BE Hub 1
Early Years STEM 
MICM 
3,999
3,300
12,840
-
3,500
5,000
610
-
-
2,000
-
1,250 
-
-
4,100
5,000
-
-
2,442
21,000 
-
-
-
-
-
1,150
5,900
-
1,300
2,500
2,557
-
300
1,350
1,600
-
-
-
1,650
-
-
-
-
-
-
-
-
-
3,999
4,450
24,490 2
5,000
4,800
7,500
5,609
21,000 
300
3,350
1,600
1,250
1 Local partner investment made up of:
Capital:  £1m (Highlands and Islands enterprise), £0.15m (Pride in Place Funding)
Revenue:  £0.75m (UHI), £0.6m (Pride in Place Funding) 
2  From OBC stage the project has forecast a nancial shortfall.  Currently estimated at circa
£4.45m, with applications for external funding in progress.  Project value excludes anticipated
private investment of £9.5m in a new hotel for Elgin (phase 3 of the project).   
Page 279

Page 280

In line with the conditions associated with Scottish and UK Government funding,
projects can only draw down funding once their full business cases have been
approved by the MGD Board, both Governments and Moray Council. During 2024,
six projects had reached this stage: 
Bus Revolution 
Cultural Quarter 
Digital Health 
EY STEM 
Housing Mix
Delivery 
MICM (capital) 
MICM (revenue) 
3,999 
16,200 
5,000 
3,500 
5,000 
3,052 
1,250 
1,028 
0
3,684 
184 
2,781 
107 
0
722 
1,987 
797 
1,417 
262 
1,021 
133 
1,750 
1,987 
4,481 
1,601 
3,043 
1,128 
133 
Page 280

Page 281

From the initial identication of prospective projects before the Deal was signed in
December 2021, through business case development and then during the delivery
of projects, engagement and consultation is a core requirement to ensure what is
being delivered meets the needs of businesses and residents whilst contributing to
stretching Deal objectives.   
Focusing on businesses and community organisations, below is a list of key
engagement activity undertaken throughout 2025.   
Workshops held to gather evidence that will inform the development
of a new skills and innovation project.  This involved:
Academic institutions who undertake activity within Moray or in
close proximity
Moray Council elected members
Bodies who represent Moray businesses
Moray businesses (either from key Moray business sectors, those
anticipated to experience growth and those who have highlighted
need).  
Public organisations with an interest in supporting and progressing
skills and innovation activity in the region 
Support from a range of community groups and businesses who sit on
project boards.   
Quick quote tender run for consultancy support to identify a vision for
a new skills and innovation project and strategic outline case.  This was
awarded to Optimat.  
Construction contract for the redevelopment of Elgin Town Hall
awarded to Taylor and Fraser. Following this, Taylor and Fraser ran
an event in Elgin that sought to recruit local rms for key work
packages.
Procurement undertaken by HIE for a service operator to run the
MICM facility.  In October 2025 the contact was awarded to Elevator
UK.  
HIE awarded facility management contracts throughout summer
and autumn 2025 for the running of the MICM facility.  
Lead developer appointed for the Dallas Dhu housing site, AJC
Construction.
Tender to develop the Elgin STEM Starts Hub awarded to Robertsons
(Construction) Ltd and Unusual Projects (interior t out).   
Engagement with a range of businesses regarding workforce mobility,
with the aim of understanding shift patterns and operational
requirements.
Page 281

Page 282

Executive Director (Economy, Enterprise and
Operations) and Moray Growth Deal Senior
Responsible O cer (SRO) 
Head of Growth, Planning and Climate 
Service Manager (Growth Deal) 
Programme O cer 
Teams in place within di erent organisations working to deliver the eight
projects that make up the Moray Growth Deal. 
: Senior Project Manager 
Head of Environmental and Commercial Services 
: Samantha Scott BE Hub Project Manager and Deputy Head of
Academic Partnerships at UHI-Moray 
David Patterson UHI-Moray Principal 
: Claire English Senior Project Manager 
Beverly Smith Head of Growth, Planning and Climate 
Page 282

Page 283

: Marie Simpson Programme Manager 
Janette Hughes Director of Planning and Performance 
: Lynne Owen Senior Project Manager 
Hazel Sly Service Manager (Early Years) 
: Rachel Watts Senior Project Manager 
Gary Templeton Service Manager (Strategic Planning and
Development) 
: Chantal Geyer Senior Project Manager 
David Reid Area Manager (Moray) 
Page 283

Page 284

Assurance activity considered by the MGD Board is structured using a series of
‘gates’ that, when triggered, require Project Managers to make submissions for
approval to progress. 
Below is a summary of the activity that has been submitted to the MGD Board
during 2025.   
HMD 
Bus
Revolution 
EY STEM 
EY STEM 
DHI 
DHI 
BE Hub
F:  In-life
review 
E:  Change 
E:  Change 
F:  In-life
review 
E:  Change 
F:  In-life
review 
E:  Change
Project in-life review. 
Pre phase 2 commencing,
adjustment of the nancial prole
based on actual information from
phase 1.   
Post Elgin Hub construction
tender realignment of the
nancial prole and project
timeline.   
Project in-life review. 
Extension of the project delivery
window to allow more time for
more e ective evaluation work to
be completed.   
Project in-life review. 
Adjustment to when revenue
funding will be provided by UHI
and SG, as SG funding currently
sitting outside the Deal window.
Jan 25 
Apr 25 
Apr 25 
May 25 
Jun 25 
Jun 25 
Sep 25 
n/a 
Approved 
Approved 
n/a 
Approved 
n/a 
Approved
Approval 
of Strategic
Outline 
Case (SOC)
Approval 
of Outline
Business
Case (OBC)
Approval 
of Full
Business
Case (FBC)
Closure 
of a 
project
Change
request to
previous
baseline
In-life 
review
Page 284

Page 285

Bus
Revolution 
MICM 
Programme 
E:  Change 
E:  Change 
E:  Change 
Request to use underspend to
fund AI simulation activity that
was not listed in the original FBC. 
Reprole of the nancial model,
delaying drawn down of HIE's
contribution to 2026/27. 
Request to move unallocated
capital from MICM to Cultural
Quarter.
Sep 25 
Nov 25 
Nov 25
Approved 
Approved 
Approved 
Page 285

Page 286

Strengthening nancial
arrangements 
Partners are reminded of the
requirement for audit evidence
when claims are submitted and
additional scrutiny given to the
project in question 
A review of payment types will be
undertaken to ensure compliance
with the European System of
Accounts 10 and in accordance
with grant conditions. 
Communications activity 
Further use should be made to
post information on My Moray
website and social media sites to
ensure e ective communication of
any developments concerning the
Moray Growth Deal. 
The Stakeholder Engagement Plan
should be reviewed and, if
required, updated. Engagement
should be undertaken with the
targeted audiences for a project to
evidence an established objective
of the Moray Growth Deal.
All elds within the
Communications Planner
spreadsheet should be completed
to aid the communication
management needs of the Moray
Growth Deal. 
Procedures have been amended to
now require supporting evidence
proportionate to the expenditure
by partner led projects to be
provided for claims made from
Moray Growth Deal funding. 
The Accountancy Service reviews
spend types to ensure compliance
with the European System of
Accounts 10 regulations, ensuring
that the conditions of the grant are
being met. 
Postings to the My Moray website
and social media sites have been
observed. There appears to be a
balance of activity against the stage
of the programme and individual
projects. 
At the time of the follow-up review
the communications planner had
been updated, ensuring
information has been captured
within the relevant elds. In
addition, press releases were
found to be stored within the
appropriate SharePoint site. 
The Stakeholder Engagement Plan
(Plan) has been reviewed and
updated and was approved by the
Programme Board at its meeting of
27 March 2025. 
Follow up audit undertaken by Moray Council 
Considered and approved by the Council’ Audit and Scrutiny Committee on 19th
November 2025, a report was submitted that followed up on actions set out in the
2024 internal audit of the Moray Growth Deal.  A copy of the report can be found in
Page 286

Page 287

Following review by the Council’s Senior Auditor, all of the actions previously
suggested have been actioned and formally closed.   
With a set of nancial transactions for the MICM project in Q4 2024/25 totalling
£953, 716.32, a threshold was exceeded that led to a routine internal audit review
of the expenditure being initiated.   A copy of the report can be found in appendix
B, with a substantial assurance rating provided.  The audit team noting that: 
A clear audit trail of the transactions was held, including a summary of all key
decision documents.
No payments were provided in advance of need.
All transaction had been approved appropriately.   
All communications related
activities, where documented, e.g.,
press releases, should be saved on
the Moray Growth Deal SharePoint
site. 
Strengthening audit arrangements
with partners 
All partner organisations should be
informed that supporting evidence
must be provided for all
expenditure claimed from Moray
Growth Deal funding. 
Further to the ndings noted within
the audit and discussions with the
Chief Financial O cer, a review of
the types of payments claimed by
the partner organisation should be
undertaken to ensure the correct
classication of expenditure.
More generally due to the
departure of a communications
team member, there has been
limited capacity to support the Deal
in the second half of 2025.   
A meeting between the Service
Manager Growth Deal, partners
and the Council’s Senior Auditor
took place in February 2025. This
provided an opportunity to gain a
greater understanding of the
auditing practices within partner
organisations and to develop a
more collaborative approach. 
The Service Manager Growth Deal
and Senior Auditor have also met
individually with all partners to
discuss their existing and planned
future audit activities, taking into
account the varying stages of
individual projects. 
In addition, the rst iteration of an
annual strategic review of risk at a
Deal level, designed to support the
scope of future audit activity was
considered and approved by the
MGD Programme Board in
November 2025.
Page 287

Page 288

The report did identify that the legal agreement in place between the council and
HIE needed updating to reect the outcome of change requests.  This has
subsequently been completed by both parties.   
With a view to further enhancing controls in place to oversee the delivery of
Growth Deal activity, in May 2025 the MGD Programme board considered and
approved a series of audit related actions.  These arose out of joint working
between the PMO and the Council’s internal audit team. 
That the PMO will undertake an
annual assessment of risk and
identify any themes from in-life
review activity, with a view to setting
out areas that should be the subject
of focus by Project Managers and be
considered as audit teams are
scoping future activity. 
There should be regular collaboration
between the Partner Organisations
Internal Audit Services and the
Council’s Senior Auditor regarding
audit activities undertaken and
planned.  This should include and ad
hoc catch-ups as needed to discuss
issues requiring further clarication
of points of concern. 
For the Council’s Senior Auditor to be
invited to ask supplementary
questions as part of the in-life review
process in the event they have
questions for specic projects.
Risk review paper considered and
approved by the MGD Programme
Board on 27 November 2025.   
First sequence of constructive
meetings between the Council’s
internal audit team and counterparts
in partner led projects took place
during the summer of 2025 and will
be repeated annually.   
2026 sequence of in-life review
activity approved by the MGD
Programme Board on 27 November.
Page 288

Page 289

Published in May 2025, the report sets out a number of recommendations that
focus on how transparency regarding Deal decision making could be enhanced. 
Specically: 
Ensure transparency of
decisions and delivery progress
on Deal websites 
Publish data on local business
involvement in annual reports 
Commit to continuous
improvement in transparency
and accessibility 
Strengthen engagement with
local businesses and
stakeholder groups 
Update reports are submitted to Moray
Council twice per year, along with ad hoc
project reports.  These will  be available as
per the reporting process for Council
meetings. 
Section 6 of this and future MGD annual
reports will provide information on this.    
MGD Programme Board will work to realise
this:
Board communications item should be
expanded to include a requirement to
consider transparency and accessibility
requirements associated with future
milestones.  
Members can use the milestone tracker in
the project dashboard report to identify
any associated actions that need to be
taken to satisfy this requirement.   
Build on measures already in place:  
Businesses involved in Deal Governance
Boards and sub-groups.
PIN notices issued for major
procurements that both raises awareness
and provides evidence to inform the
procurement activity.
Work with Business Gateway to raise
awareness of future opportunities. 
Page 289

Page 290

May 2026
Page 290

Page 291

Report to: Moray Council Meeting Date: 30 June 2026 
Report by:  Executive Director Economy, Enterprise and Operations      
Author: Beverly Smith  Contact Email: Beverly.Smith@moray.gov.uk 
Subject: Short-Term Let Control Areas 
1.  PURPOSE 
☒ For Decision      ☐  For Information 
1.1  The purpose of this report is to consider the feasibility of introducing Short-Term let control
areas in Moray and whether there are any specific areas within Moray that require more
detailed analysis.  
1.2  This report is submitted to the Council in terms of Section II (19) of the Council’s Scheme
of Administration relating to Housing.  
2.  SUMMARY  
2.1  This report contains information relating to the provision of Short Term Let Control Areas
(STLCAs) within a Moray context.  
3.  RECOMMENDATIONS 
3.1  It is recommended that the Council:   
i) note the contents of the report; and   
ii) agree that Officers do not progress with designating any Short-Term Let Control
Areas in Moray at this time.   
Beverly Smith
Head of Growth, Planning and Climate (Chief Planning Officer) 
4.  BACKGROUND AND CONTEXT  
4.1  At a meeting of Planning & Regulatory Services committee on 17 December 2024, a
motion was raised and agreed that Officers would bring a report to Moray Council within
18 months setting out the feasibility of introducing Short-Term Let Control areas in Moray,
identifying specific areas where such controls might be appropriate. 
Item 15.
Page 291

Page 292

4.2  The Planning (Scotland) Act 2019 introduced provision for Planning Authorities to
designate all or part of their housing stock areas as a Short Term Let Control Area (STLCA)
with the following aims: 
• To help manage high concentration of Short Term Lets (where it affects the
availability of residential housing or the character of a neighbourhood);
• To restrict or prevent Short Term Lets (STLs) in places of building where it is not
appropriate; and
• To help local authorities to ensure that homes are used to best effect in their areas. 
4.3  To achieve this, Section 26B of the 1997 Act sets out that a change of use of a
dwellinghouse to a STL (as defined) within a STLCA will be deemed to be a material change
of use and require planning permission.  This only applies once a STLCA comes into force
and cannot be applied retrospectively.  A STLCA cannot control guest houses, B & B’s,
Annexes and pods.  It would have no effect on second homes or purpose-built holiday
accommodation.  The provision remains that planning permission may still be required for
a material change of use to short�term letting, even if no STLCA has been designated,
where the planning authority considers this necessary.  The majority of short-term lets that
have required planning permission due to a change of use relate to flats within a block
with shared access or facilities. 
4.4  Short�term lets are also subject to separate licensing requirements, which provide the
legal authority to let accommodation to guests on a temporary basis. Schedule 3 of the
Civic Government (Scotland) Act 1982 (Licensing of Short�term Lets) Order 2022 makes it
a mandatory licence condition that, within a Short�Term Let Control Area (STLCA), where
the use of a property as a short�term let requires planning permission, the licence holder
must ensure that either: 
i) an application for planning permission has been made under the Town and
Country Planning (Scotland) Act 1997 and has not yet been determined; or
ii) planning permission is in force under the 1997 Act. 
These requirements take effect only once a licence has been granted. Where planning
permission is required but not yet in place, licence applications may be suspended to
allow time for the necessary permission to be obtained. 
4.5  The regulatory process for designating a Short�Term Let Control Area (STLCA) comprises
three stages: 
1. notification and consultation;
2. submission of the proposal to, and approval by, the Scottish Ministers; and
3. public notice of the designation. 
Reaching a decision on whether to progress with the designation of an STLCA involves
several key decision points, including consideration of the supporting evidence, analysis
of consultation responses, and, ultimately, whether to designate an area. The planning
authority is required to prepare a statement of reasons for any proposal. 
4.6  The Housing Need and Demand Assessment (HNDA) achieved “robust and credible”
status on 21 December 2023 and was approved by the Housing and Community Safety
Committee on 13 February 2024 (paragraph 6 of the minute refers). Appendix C of the
HNDA is of particular relevance to this report, as it provides contextual evidence on
Page 292

Page 293

housing pressures and tenure patterns across Moray.  
4.7  Across Moray, 753 short�term let licences have been issued to date. In addition, 32
applications remain undetermined, 3 have been assessed as invalid and 74 have been
withdrawn. Spatial analysis of the licensed short�term let data indicates a clear pattern of
geographic concentration rather than an even distribution across the authority area. Six
distinct short�term let ‘hot spot’ locations have been identified: Buckie, Cullen, Elgin,
Findhorn, Lossiemouth and Portknockie. ‘Hot spots’ are defined as having 8 or more
licensed STLs within a 10 hectare hexagon tile.  It should be noted that these figures reflect
licensed properties only and therefore do not capture any short�term lets operating
without a licence. 
4.8  While short�term letting remains limited in most Moray communities, growth is
continuing within a small number of locations, resulting in localised concentrations.
Cullen exhibits the most pronounced clustering, with 38 short�term lets (21% of the
properties within one hot�spot zone) and a further 11 (7.4% of properties within a second
hot-spot zone). Other identified hot�spot areas display lower, but still notable, levels of
clustering, generally ranging from 3 - 4, 5 - 7 and 8 -14 properties per zone. Appendix 1
illustrates the spatial distribution of the six hot�spot areas: Elgin contains one zone with 9
properties; Findhorn has two zones with 12 and 14 properties respectively; Portknockie
comprises two distinct zones, each containing 8 properties; and Lossiemouth contains
three zones with 8, 9 and 10 properties.  The table below sets out the number of licensed
STLs as a percentage of total residential units within each data zone: 
Map
(hot
spot)
Town Total Number
of Residential
Units 
Total Number
of STLs
% of Licensed
STLs –
Residential
1 (a) Buckie 102 9 8.82%
2 (a) Cullen (Seatown) 181 38 20.99%
2 (b) Cullen 148 11 7.43%
3 (a) Elgin 211 9 4.27%
4 (a) Findhorn 90 14 15.56%
4 (b) Findhorn 130 12 9.23%
5 (a) Lossiemouth 99 8 8.08%
5 (b) Lossiemouth 121 9 7.44%
5 (c) Lossiemouth 263 10 3.80%
6 (a) Portknockie 206 8 3.88%
6 (b) Portknockie 64 8 12.50% 
4.9  Taken together, this evidence demonstrates that short�term let activity in Moray is not
widespread but is instead concentrated in a limited number of settlements and
neighbourhoods, suggesting that any impacts are likely to be localised rather than
authority�wide. 
Page 293

Page 294

5.  INITIAL ANALYSIS 
5.1  The Scottish Government’s Short�Term Lets and Planning Circular 1/2023 provides
guidance on the designation of Short�Term Let Control Areas (STLCAs) and the
circumstances in which planning permission is required for short�term lets. In order to
designate an STLCA, a planning authority must prepare a statement of reasons setting out
the justification for its proposal. 
This statement is a critical component of the designation process, as it explains to those
affected by the proposed control area, and to the Scottish Ministers, why the planning
authority considers designation to be necessary and proportionate. 
The Circular highlights that a planning authority may seek to designate an STLCA, and
thereby ensure that planning permission is always required for a change of use from a
dwellinghouse to short�term letting, in order to support one or more of the following
policy objectives: 
a) to enable consideration of impacts on the availability of residential housing;
b) to enable consideration of impacts on the character or amenity of a
neighbourhood; and
c) to enable consideration of impacts on different types of buildings. 
5.2  The policy objectives being pursued will directly influence the nature and extent of the
evidence required. Planning authorities should consider whether there are systemic
material planning considerations, namely, the same issues arising repeatedly across one
or more areas, that indicate a cumulative impact arising from the use of dwellinghouses
as short�term lets. 
The Circular provides a number of indicative factors that may point to such cumulative
impacts, including: 
• a lack of affordable and appropriate housing for local residents;
• a detrimental impact on local amenity, including where businesses, schools or
other services have closed or relocated;
• noticeable changes to the character, appearance or ‘look and feel’ of a
neighbourhood; and
• a significantly higher level of complaints related to the use of dwellinghouses as
short�term lets, arising from multiple properties across an area, when compared
with similar locations. 
5.3  Consideration of each of these indicators, alongside a review of registered Local Place
Plans, will inform a high�level assessment of whether sufficient evidence exists to
recommend that any short�term let control areas in Moray should be progressed to a
more detailed and focused review. 
Criteria 1 – Lack of affordable and appropriate housing for local residents
5.4  Moray’s Housing Need and Demand Assessment (HNDA) Appendix C provides a detailed
analysis of the Council’s housing stock profile and the pressures affecting it. It also
includes a containment analysis of open market property sales over a five�year period,
undertaken to identify and confirm Moray’s Housing Market Areas (HMAs) for use in both
the Local Development Plan (LDP) and the Local Housing Strategy. 
Page 294

Page 295

5.5  The containment analysis demonstrates a high degree of self�containment within Moray’s
housing market, with 76% of all house sale transactions involving households already
living in, or moving within, the Moray area. All identified housing market sub�areas are
self�contained, with the exception of the Cairngorms National Park, where the market is
characterised by a significantly higher level of inward migration, accounting for 67% of
transactions. The orange�shaded figures in the table below highlight the most notable
results of this analysis. 
5.6  Had this pattern of inward migration been accompanied by evidence of high levels of
housing need, as demonstrated through the Council’s Housing List, and/or sustained
higher�than�average house price inflation, these factors could have indicated that the
designation of a Short�Term Let Control Area (STLCA) within the Cairngorms National Park
Housing Market Area (HMA) should be considered. However, this is not the case.
The Council’s Housing List shows very limited demand for accommodation within the
Cairngorms National Park HMA. Furthermore, the HNDA provides evidence that this area
has the lowest median house prices of all Moray’s HMAs, indicating comparatively lower
market pressure despite the higher levels of inward migration. 
5.7  Locations identified as short‑term let ‘hot spots’, such as Cullen, display relatively low
proportions of short‑term lets when assessed against the total residential stock (7.65%).
In these areas, the issue is one of spatial concentration rather than overall scale, with
properties largely clustered within specific neighbourhoods such as Seatown. A
comparable pattern is evident in Findhorn, where short‑term lets account for 8.09% of
the housing stock. The table below sets out the total STLs as a percentage of the total
housing stock each town where hot spots have been identified.  
Town Total Residential
Stock (Properties)
Total Number of
Licensed STLs
Total % of STLs –
Residential Stock
(Properties)
Buckie 4529 29 0.64%
Cullen 797 61 7.65%
Elgin 12877 65 0.50%
Findhorn 606 49 8.09%
Lossiemouth 3458 66 1.91%
Page 295

Page 296

Portknockie 599 26 4.34% 
5.8  Overall, the evidence indicates that the impact of short‑term lets on Moray’s effective
housing stock is relatively limited. Perceptions of higher short‑term let activity in some
areas may instead reflect patterns of second‑home ownership rather than the loss of
housing to short‑term letting. On this basis, there is no clear evidence to support the
designation of a Short‑Term Let Control Area on grounds of reduced housing affordability
or a lack of appropriate housing for local residents. 
Criteria 2 – Detrimental Impact on local amenity with some businesses, schools or
other services closing or re-locating.
5.9  In areas where concentrations of short‑term lets are present, there is no evidence to
indicate a detrimental impact on local amenity resulting in the closure or relocation of
businesses, schools or other services. Settlements such as Findhorn and Cullen continue
to demonstrate strong levels of local activity and service provision. There is no indication
that the presence of short‑term lets has adversely affected the vitality or sustainability of
these communities.
Criteria 3 – Other considerations 
5.10  Review of enforcement records over the past two years indicates a very low level of
activity associated with short‑term let properties, with only four enquiries recorded. None
of these enquiries related to amenity impacts. Environmental Health records show that,
while noise complaints are received across Moray, there is no evidence to suggest that
short‑term lets are contributing to amenity issues in any specific location.  
5.11  Potential changes to the appearance of an area, such as the proliferation of key boxes on
property frontages, have also been considered. At present, there is no evidence of such
visual impacts occurring within identified short‑term let hot‑spot areas. In addition,
issues relating to waste collection, which can arise where properties are not permanently
occupied, have been reviewed. The Waste Manager has confirmed that there are no
known areas of concern within Moray linked to short‑term let activity.  
5.12  Community views on short�term lets have been considered through a review of
registered, community�led Local Place Plans (LPPs), which provide one of the primary
sources of evidence available to the planning authority on locally expressed priorities and
concerns. LPPs are prepared following community consultation and therefore offer an
indication of community�level opinion.  There are nine registered local place plans and
these include Burghead, Cabrach, Cullen and Deskford, Finderne, Findhorn, Ecovillage
Findhorn, Forres, Lossiemouth and Portgordon. 
A review of all registered LPPs has been undertaken to identify whether communities have
expressed concerns regarding the scale or impacts of short�term lets, or have explicitly
prioritised the designation of a Short�Term Let Control Area within their plans.  There are
refences about balancing tourism with residents needs and generally across all they are
seeking more affordable housing opportunities however none have explicitly requested
the designation of a Short Term Let Control Area. 
5.13  Other Authorities such as Edinburgh City Council and Highland Council have
implemented STLCAs with varying success.  Significant legal challenges have resulted in
changes to legislation with STLCAs unable to be applied retrospectively.  This has
prompted other authorities to take a more cautious and measured approach.  Highland
Council have recently concluded a consultation on a proposed STLCA for Inverness City. 
Page 296

Page 297

The proposal is based on evidence of significant external property sales of up to 50%
(purchased by non-Highland residents) linked to a decrease in long-term private rentals,
increased monthly rental prices and reduction in owner-occupied primary residences
which overall is considered to be detrimentally impacting on the availability of housing
and delivering Local Housing Strategy objectives.  As set out in this report, Moray is not
experiencing a comparable impact from Short Term Lets to merit the introduction of a
STLCA.    
5.14  Conclusion
The evidence considered in this report indicates that short�term let activity in Moray is
limited in scale, geographically localised, and does not give rise to the types of cumulative
impacts identified in Scottish Government guidance as justifying the designation of a
Short�Term Let Control Area. There is no clear evidence of harm to housing availability or
affordability, no demonstrable detrimental impact on local amenity or service provision,
and limited community concern as expressed through Local Place Plans. 
It is also worthy of note that short�term lets make a positive contribution to tourism and
Moray’s wider economy, supporting local businesses and services, particularly in coastal
and rural communities. 
This report therefore recommends that the process to formally designate a Short�Term
Let Control Area, either on a Moray�wide basis or within a specific area, would not be
justified for the reasons outlined in this report.  
6  SUMMARY OF IMPLICATIONS  
6.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) ☐ ☒
Policy and Legal ☒ ☐
Financial ☒ ☐
Risk ☒ ☐
Staffing ☒ ☐
Best Value and Transformation ☐ ☒
Property ☐ ☒
Information Communications Technology/Digital ☐ ☒
Equalities. Social Inclusion and Economic Impact  ☒ ☐
Climate Change and Biodiversity Impact ☐ ☒ 
6.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☐ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
Page 297

Page 298

b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☐ Building a better future for our children and young people in   Moray.
☒ Empowering and connecting communities.
☐ Improving wellbeing of our population   
6.3  Policy and Legal 
The Council is dealing with Short-term let licence applications under the Civic
Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022. The
designation of a short term let area would be designated under 26B of the 1997 Act, as
amended by the Planning (Scotland) Act 2019.    
6.4  Financial 
There are no financial implications arising from the report.  The designation of a short -
term let in Moray would have significant staffing resources that cannot be met within
existing budgets.  This will relates to officer time and consultancy fees in establishing a 
control area, and if agreed, thereafter, its implications  While fees can be recovered for
any subsequent processing of planning applications, these do not necessarily result in
full cost recovery, and it is likely to result in a significant increase in enquiries where fee
income will not cover cost. 
6.5  Risk 
Any decision taken to progress with a STLCA may be subject to legal challenge and this
would require significant external legal resources.  This risk can be mitigated by a more
detailed review to support any proposal as this report is a short feasibility study.  
6.6  Staffing
Any decision taken to progress work on bringing into effect a STLCA will have resource
implications that will not be met within existing staff resources and additional budget
would be required.  This would relate to officer time and consultancy fees in establishing a
control area and if agreed for its implementation.  While fees can be recovered for any
subsequent processing of planning applications, this would not result in full cost recovery. 
6.7  Best Value and Transformation 
None.  
6.8  Property 
None.  
6.9  Information Communications/Technology/Digital 
None.  
6.10  Equalities, Social Inclusion and Economic Impact 
This report relates to principles of  introducing a STLCA, not its implementation and
therefore an Integrated Impact Assessment (IIA) is not required.  
6.11  Climate Change and Biodiversity Impacts 
None. 
7  CONSULTATION
Page 298

Page 299

7.1  This report has been prepared in consultation with Executive Director Economy, Enterprise
and Operations; Executive Director Education, Housing and Communities; Head of
Growth, Planning and Climate; Service Manager Strategic Planning & Development, Head
of Housing, Property and Communities; Service Manager Democratic Services; Chief
Financial Officer; Chief Governance Officer; Service Manager Legal Services and any
comments made have been incorporated into the report. 
8  BACKGROUND PAPERS  
8.1  Housing Need and Demand Assessment (HNDA) - Moray Council 
Appendix 1 – Maps of Hot Spot Areas 
Page 299

Page 300

A
1 Buckie
Page 300

Page 301

,.
Bum,.,
Q(1llen
Cullen Bay
11
(..
\ Cullen
1
1pld Kirk
Ccn
Legend
c::::J Hotspot 8 STL Plus
c=] 1-2STL
3 -4 STL
5 - 7 STL
8 - 14 STL
38 STL
-----
© Crown,copyright [and datab_a3.�,.rights] 2025 OS AC0000806936 Moray Council. You are permitted to use this data solely to enable you to respond to,
or intera.c!•with, the organisation that provided you with the data. You are not permitted to copy, sub-license, 1
distribute or sell any of this data to third parties in any form. Third party rights to enforce the terms of this licence shall be reserved to OS.
Cullen - STL Hotspot of 8 and more in 1 OHa 1 :5,000 @ A3 W+E
2 Cullen2 Cullen
A
B
Page 301

Page 302

3 Elgin
A
Page 302

Page 303

4 Findhorn
A
B
Page 303

Page 304

5 Lossiemouth
A
B
C
Page 304

Page 305

6 Portknockie
B
A
Page 305

Page 306

Page 306

Page 307

Report to: Moray Council  Meeting Date: 30 June 2026  
Report by: Executive Director Economy, Enterprise and Operations      
Author: Lydia Simpson  Contact Email: Lydia.simpson@moray.gov.uk 
Subject: Information Report - Child Poverty Funding Update 
1.  PURPOSE 
☐ For Decision      ☒  For Information 
1.1  The purpose of this report is to consider and note the different funding streams received
from Scottish Government to tackle Child Poverty in current financial year. 
1.2  This report is submitted to Council in terms of Section(III) (B) (19) of the Council’s Scheme
of Administration relating to formulate and review Council wide policy, strategies,
priorities and objectives in relation to cross cutting issues which do not fall within the
remit of service committees such as equalities, poverty, armed forces, Brexit,
immigration.  
2.  SUMMARY  
2.1  There have been several funding streams that have been made available to Moray Council
in recent months, some through agreement at COSLA, and others by funding bids made to
support identified need and work to tackle child poverty within the Local Authority area. 
3.  BACKGROUND AND CONTEXT  
3.1 Child Poverty remains the top priority for Scottish Government, with targets for reducing
Child Poverty by 2030. A new National Delivery Plan, “Bring Hope, Building Futures” was
published at the end of March 2026 
3.2 From this new National Delivery Plan key areas have been identified to tackle, with funding
provided, or opportunities to bid for funding. A cohort of officers within the Council have
been working together to ensure collaboration takes place, duplication is avoided, and
funding is used to tackle local identified need. 
4.  OVERVIEW OF POVERTY FUNDING  
4.1 Bright Start Breakfasts
10 Schools were successful in applying for this fund for Breakfast Clubs. 7 schools
planned to expand clubs they already had running, 3 were to start new provision from
Page 307

Page 308

August 2025. Funding £54,000 for term 25/26. Long term Plan by Scottish Government to
have one of these breakfast clubs in every Primary School by August 2027. 
4.2 Child Poverty Accelerator Funding 
Successful application was made for work to support parents in the Early Years and link
Community Connections. Joined up working between Health Visitor Team, Children’s
Services and Employability. Funding £102,000 over 2 years starting April 2026.  
4.3 
4.4   
4.5 
4.6 
4.7 
Adopt and Adapt 
Moray received funding from Scottish Government for Adopt and Adapt Funding. This was
allocated to each Local Authority that did not receive any Fairer Futures Partnerships
Funding over the last 3 years. This funding is provided to support councils’ efforts to
access and engage with the learning and evaluation programme, and to embed relevant
learning in their local work on child poverty. Funding is being used to purchase a Licence
for LIFT data service, which support early identification of families needing support. This
links with the efforts to reduce the number of children going into placements.  Funding
£140,000. 
Addressing De-Population 
Application made to expand learning from transport linking with childcare provision to
make childcare more sustainable in a rural setting. This will focus on the Speyside area
working collaboratively with the Transport Team Funding £30,000. 
Children’s Activities 
Moray has been invited to submit a proposal for this funding. The total fund is £2.5M, but
will likely be spread across various projects in Scotland. As Scottish Government are in
consultation around the deregulation of School Age Childcare, they are looking for pilot
areas to establish how a new system could work that enables parents to learn, train and
work. Outcome of this bid should be announced by end of June 2026.  This fund is the
subject of a separate report, Children’s Activities Report, to Education, Children’s and
Leisure Services Committee on 23 June 2026. 
Transport 
Hitrans have been awarded £1M from a national funding pot of £10M. They are currently
working with Local Employability Partnerships and the Local Authority Transport Team to
identify projects that can be funded to support employment. There is another £9M that
has now been shared between Local Employability Partnerships as it is for supporting
Parents for travel to work, training or learning. Moray received £155,000 
All this funding sits alongside the Whole Family Wellbeing Fund and the Parent
Employability Fund to reduce Child Poverty rates. There is also funding being allocated to
Further Education, Third Sector and NHS to further provide opportunities to increase
family incomes and reduce costs. 
5. SUMMARY OF IMPLICATIONS  
5.1  The table below shows whether risks and implications apply if the recommendations are
agreed: 
SUBJECT YES NO
Corporate Plan and 10 Year Plan (Local Outcome Improvement Plan) X 
Policy and Legal  X
Page 308

Page 309

Financial  X
Risk  X
Staffing X 
Best Value and Transformation  X
Property  X
Information Communications Technology/Digital  X
Equalities. Social Inclusion and Economic Impact  X 
Climate Change and Biodiversity Impact  X 
5.2  Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan (LOIP))
Improved Collaborative Leadership, as part of continuous improvement through Best
Value, will better enable the Council to fulfil the ambitions set out in its strategic plans. 
a) Links to Council Corporate Plan – The proposals in this report support and contribute
to improved outcomes for communities as outlined in the following Council Plan
strategic priorities:
☒ Tackle Poverty and Inequality.
☐ Build Stronger Greener Vibrant Economy.
☒ Build Thriving, resilient, empowered Communities.   
b) Links to Local Outcomes Improvement Plan – The proposals in this report support
and contribute to improved outcomes for communities as outlined in the following
Local Outcomes Improvement Plan priorities:
☒ Developing a diverse, inclusive, and sustainable economy
☒ Building a better future for our children and young people in   Moray.
☐ Empowering and connecting communities.
☐ Improving wellbeing of our population   
5.3  Policy and Legal 
The Council assesses support for economic development initiatives on their individual
merits, guided by the objectives of facilitating sustainable economic growth and achieving
the outcomes set out in the Ten-Year Plan and Corporate Plan.  
5.4  Financial 
All this funding is for the current financial year, except Bright Start Breakfast, as this runs
with the academic year 25-26, with no guarantee of further funding beyond 2027, so care
has been taken to identify local need and tackle what can be addressed within the
timeframes. The funding is supporting work already being carried out by several
departments and partners, rather than having additional projects that create capacity
issues. See Appendix 1 for all funding allocations and there are no direct financial
implications for the council. 
5.5  Risk 
The short timeframes for the funding sources, but this is not unusual for Scottish
Government funding. The projects funded should be completed, or learning used, to
further work already planned for Moray. 
5.6  Staffing 
Any extra staffing is accounted for in the funding bids and fully costed. 
5.7  Best Value and Transformation
Page 309

Page 310

The use of external grant funding supports Best Value by enabling the Council to deliver
priorities around child poverty without placing additional pressure on core budgets.  
5.8  Property 
None arising from this report 
5.9  Information Communications/Technology/Digital 
None arising from this report 
5.10  Equalities, Social Inclusion and Economic Impact 
An equality impact assessment is not required as the reason for the report is to note
funding opportunities taken to address poverty and that will increase access to affordable,
flexible after-school activities.  This increase will provide opportunities for parents trying to
work, increase hours, access training or move into employment and will benefit lone
parents, low-income households, rural families and those with non-standard working
patterns.  Access to affordable childcare is closely linked to child poverty therefore
increased provision will have a positive economic impact for those most in need.  
5.11  Climate Change and Biodiversity Impacts 
None arising from this report. 
6. CONSULTATION  
6.1  This report has been prepared in consultation with Executive Director Education, Housing
& Communities, Chief Governance Officer (Monitoring Officer), Chief Financial Officer,
Head of Growth, Planning & Climate, Head of Education (Chief Education Officer), Service
Manager Leisure and Culture Service Manager Early Years, Service Manager Legal
Services, Equal Opportunities Officer and Caroline O’Connor, Committee Services Officer
and any comments made have been incorporated into the report.  
7. BACKGROUND PAPERS
7.1  None   
Page 310

Page 311

Summary Table                  APPENDIX 1
Fund Project/Total
Cost
Council Role/Liability Funding  Funding Objectives 
Managed by
Inspiring
Scotland 
Bright Start
Breakfasts 
10 Schools have their own individual budget,
amount of funding varies from school to
school.
Each school manages and administers their
budget
Outcomes reported direct to Inspiring
Scotland by each School 
£54,000 awarded 
Scottish Government
have announced a
further £3M for academic
year 26-27 to continue to
support these clubs. 
To provide access to breakfast clubs
for primary school children by
combining the provision of healthy
and nutritious breakfast food with
before-school supervision or
childcare, enabling early drop off for
parents to support them to work or
study
Scottish
Government 
Child Poverty
Accelerator
Fund
Lead Applicant
Fully responsible for managing budget 
Support from Health and 3rd Sector, Childrens
Services will co-ordinate this. 
Learning and testing to be reported back to
Scottish Government 
£102,000 awarded over 2
years 
To provide support to enhance an
area’s approach to tackling child
poverty. It supports small scale
projects to generate evidence on a
known problem, adapt a promising
approach from elsewhere to work in
your area, or re-design a service or
services to deliver greater impact on
child poverty.
Scottish
Government 
Adopt and
Adapt
Awarded to Local Authorities that did not
receive Fairer Futures Partnership funding 
Fully responsible for managing the budget
Co-ordination between departments
internally and with Health colleagues. 
Feedback to COSLA to understand the impact
of the funding through informal, ‘lessons
learnt’ focused discussions with Programme
Leads. 
£140,000 awarded Aims for this project can be-
Engagement with (Fairer Future
Partnerships) FFP and wider
learning networks.   
Coordination of activity within the
local authority area to align with
emerging knowledge 
Sharing learning back into FFP
network 
Procuring external support to
adopt or adapt approaches to
tackling child poverty that have
proved successful to date and
which can be implemented to
Page 311

Page 312

improve existing local delivery.  
Scottish
Government 
Addressing de-
Population
(ADAP)
Sole Applicant 
Internal co-ordination between departments,
using learning from previous project on
school age childcare. 
Project Officer co-ordinating the learning. 
Reporting to Scottish Government on
Learning and development of project 
£30,000 awarded Focus on retaining current residents
and attracting newcomers to rural
and island communities through
targeted funding, tailored migration
programs, and grassroots
development. Understand drivers of
depopulation locally.
Scottish
Government
Childrens
Activities 
Sole Applicant
Overall administration of the funding, with
employment of staff to support this.
Agreements made with local providers as
needed. 
£800,000 bid for Year 1
(awaiting decision)
To build a system of school age
childcare, targeted for families on low
incomes, supporting parents and
carers to take up work education or
employment. 
Scottish
Government
Transport to
Employment 
Work in Partnership with Regional Transport
Partnership (RTP)
Internal co-ordination between departments 
£155,000 awarded into
Local Employability
Partnership 
RTP HiTrans has £1M
awarded across the
Highlands & Islands
Region this is to address
infrastructure issues and
is in the process of being
allocated to Local
Authorities.  
Part of a package of funding to tackle
barriers to employment for parents 
and reduce child poverty rates.
Person centred interventions to help
parents access training and
employment. 
Page 312