Democracy Spraffa

Agenda Document Pack - Clinical and Care Governance Committee - 23/02/2023

Moray Council · 23 February 2023
Back to Clinical and Care Governance Committee — 23 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Clinical and Care Governance Committee 
Thursday, 23 February 2023 
Council Chambers 
NOTICE IS HEREBY GIVEN that a Meeting of the Clinical and Care Governance
Committee, Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Thursday, 23 February 2023 at 14:00 to consider the business noted below. 
AGENDA 
1. Sederunt 
2. Declaration of Member's Interests 
3. Minutes of meeting of 27 October 2022 5 - 8
4. Action Log - 27 October 2022 9 - 10 
Leadership and Accountability 
5. Strategic Risk Register 11 - 38 
Effecitve Communication and Information 
6. Complaints Quarter 3 2022-2023 39 - 52 
Safe and Effective Practice 
7. Clinical and Care Governance Group - Q3 Escalation
Report
53 - 66
8. Adult Support and Protection Multi Agency
Improvement Plan
67 - 80 
Accessible, Flexible and Responsive Services 
Page 1

Page 2

9. Clinical and Care Governance Update Report 81 - 84
10. Items for Escalation to MIJB 
Page 2

Page 3

MORAY INTEGRATION JOINT BOARD 
SEDERUNT 
Mr Derick Murray  (Chair)
Dr Robert Lockhart  (Chair)  
Professor Siladitya Bhattacharya  (Voting
Member)
Councillor Peter Bloomfield  (Voting Member)
Councillor Scott Lawrence  (Voting Member)
Mr Graham Hilditch  (Member)
Professor Duff Bruce  (Member)
Ms Tracy Stephen  (Member)  
Mr Ivan Augustus  (Non-Voting Member)
Ms Karen Donaldson  (Non-Voting Member)
Ms Jane Ewen  (Non-Voting Member)
Mrs Val Thatcher  (Non-Voting Member) 
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 3

Page 4

Page 4

Page 5

MINUTE OF MEETING OF THE CLINICAL AND CARE GOVERNANCE
COMMITTEE 
Thursday, 27 October 2022 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Professor Siladitya Bhattacharya, Councillor Peter Bloomfield, Mr Simon Bokor-
Ingram, Ms Sonya Duncan, Councillor Scott Lawrence, Mr Derick Murray, Ms
Samantha  Thomas 
APOLOGIES 
Mr Ivan Augustus, Mr Sean Coady, Ms Karen Donaldson, Ms Jane Ewen, Mr
Graham Hilditch, Ms Deborah O'Shea, Mr Neil Strachan, Mrs Val Thatcher 
IN ATTENDANCE 
Also in attendance at the meeting were the Moray ASP Consultant Practitioner and
Tracey Sutherland, Committee Services Officer.   
1.         Chair 
The meeting was chaired by Mr Derick Murray.  
2.         Welcome and Apologies 
The Chair welcomed everyone to the meeting and apologies were noted.  
3.         Declarations of Member's Interests 
There were no declarations of Members' Interests in respect of any item on the agenda.    
Item 3.
Page 5

Page 6

4.         Minute of Meeting of 25 August 2022 
The minute of the meeting of 25 August 2022 was submitted and approved.  
5.         Action Log - 25 August 2022 
The Action Log of the meeting for 25 August 2022 was discussed and updated.  
6.         Clinical and Care Governance Group Escalation Report - Quarter 2 
A report by the Chief Nurse informed the Committee of progress and exceptions
reported to the Clinical and Care Governance Group during quarter 2 of 2022/23 (1
July up to 30 September 2022).  
Councillor Lawrence sought clarification on the admission criteria for the new Varis
Flats in Forres.  In response, the Chief Nurse confirmed that she would provide
Councillor Lawrence with the information following the meeting.  
Following consideration the Committee agreed to note the contents of the report.  
7.         Adult Support and Protection Multi Agency Improvement Plan 
A report by the Consultant Practitioner, Moray Adult Support and Protection informed
the Committee of the Adult Support and Protection (ASP) Multi-agency Improvement
Plan in place following the recent joint inspection of ASP in the Moray partnership.  
Following consideration the Committee agreed to note:  
i) the multi-agency Improvement Plan and progress to date; and    
ii) the systems in place to monitor and progress actins within the plan.    
8.         Clinical and Care Governance Progress Update 
A report by the Chief Nurse provided an update to the Committee of the
developments in relation to clinical and care governance and the intention to hold a
further workshop.  
Following consideration the Committee agreed to:  
i) note the content of this report and the associated action plan (Appendix 1);    
ii) acknowledge the delay in the provision of the workshop due to changes in
senior personnel and the impact of the Covid-19 pandemic; and    
iii) note that an update will be provided in four months time.    
9.         Complaints - Quarter 2 2022-23 
A report by the Chief Nurse informed the Committee of complaint reported and closed
during Quarter 2 (1 July 2022 to 30 September 2022).  
Page 6

Page 7

Following consideration the Committee agreed to note the totals, lessons learned,
response times and action taken for complaints completed within the last quarter.  
10.         Annual Complaints Report 2021-22 
A report by the Chief Nurse provided the Committee with the Draft Health and Social
Care Moray (HSCM) Annual Complaints Report for 2021/22.  
Following consideration the Committee agreed to:  
i) note the contents of the annual report; and    
ii) submit the draft HSCM Annual Complaints Report to the Moray Integration Joint
Board in November for approval prior to publication. 
11.         Drug Related Deaths in Moray 
A report by the Interim Integrated Service Manager updated the Committee about
Drug Related Deaths in Moray 2020, 2021 and into 2022.  
Following consideration the Committee agreed to note:  
i) the drug related death figures for Moray;    
ii) the continued work of the service in relation to the Multi-Agency Risk System
(MARS) process; and    
iii) the work being taken to support the delivery of the Medication Assisted
Treatment (MAT) Standards implemented by the Scottish Government in May
2021.    
12.         Strategic Risk Register 
A report by the Chief Officer provided an overview of the current strategic risks, along
with a summary of actions which are in place to mitigate those risks, updated on 17
October 2022.  
Following consideration the Committee agreed to note:  
i) note the updated Strategic Risk Register at Appendix 1; and    
ii) note the Strategic Risk Register will be further refined to align with the
transformation and redesign plans as they evolve.     
Page 7

Page 8

Page 8

Page 9

MEETING OF MORAY INTEGRATION JOINT BOARD CLINICAL AND CARE GOVERNANCE COMMITTEE  
THURSDAY 27 OCTOBER 2022     
ACTION LOG    
ITEM
NO. 
TITLE OF REPORT  ACTION REQUIRED  DUE DATE  ACTION
BY 
UPDATE
FEBRUARY
2023
1. Clinical and Care
Governance Group
Escalation
Information on the admission criteria for
Varis Flats to be provided to members
of the Committee 
Chief Nurse 
Item 4.
Page 9

Page 10

Page 10

Page 11

REPORT TO: MORAY INTEGRATION JOINT BOARD CLINICAL CARE
GOVERNANCE COMMITTEE ON 23 FEBRUARY 2023 
SUBJECT: STRATEGIC RISK REGISTER – JANUARY 2023 
BY:  CHIEF OFFICER 
1. REASON FOR REPORT 
1.1 To provide an overview of the current strategic risks, along with a summary of
actions which are in place to mitigate those risks, updated January 2023. 
2. RECOMMENDATION 
2.1 It is recommended that the Clinical and Care Governance Committee
agree to consider and note: 
i) the updated Strategic Risk Register included in APPENDIX 1; and 
ii) the Strategic Risk Register will be further refined to align with the
transformation and redesign plans as they evolve. 
3. BACKGROUND 
3.1 The strategic risk register is reviewed regularly by the Senior Management
Team as part of a robust risk monitoring framework, to identify, assess and
prioritise risks related to the delivery of services in relation to delegated
functions, particularly any which are likely to affect the delivery of the Strategic
Plan. 
3.2 The Moray Integration Joint Board (MIJB) Strategic Risk Register is attached
to this report at APPENDIX 1 and sets out the inherent risks being faced by
the MIJB, together with a current assessment on the level of the risks and
mitigating actions being taken to reduce the impact of the risks.  This report is
presented to Clinical and Care Governance Committee for their oversight and
comment. 
3.3 Risk scores are weighted, based on assessment according to their likelihood
and corresponding impact, as per Section 5 of the MIJB Risk Policy.   
Item 5.
Page 11

Page 12

3.4 The Strategic Risks received an initial review to ensure they align to the
Moray Partners in Care 2022-2032 strategic plan which was agreed at MIJB
on 24 November 2022 (para 14 of the minute refers). 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The Risk Management Framework review was completed and outcome was
approved by the Board on 25 June 2020 (para 9 of the minute refers). The
approved Risk Appetite Statements have been included in APPENDIX 1. 
4.2 The return to ‘business as usual’ from the Covid-19 pandemic continues.
However, there has not been any relief in the system, and it continues to
challenge and already pressured system. 
4.3 The senior leadership teams continually consider the appetite for risk whilst
planning and effecting transformational change and redesign, despite
operating within a very finite budget. 
4.4 Work continues across teams to ensure the Risk Register is updated in the
timescales dictated by the criteria. Work continues to support teams with this. 
4.5 Governance, adverse events and risk will be covered as part of a Clinical
Governance workstream in upcoming workshops, commencing January 2023. 
4.6 The continued safe delivery of services is a priority and as such, dedicated
management time is being directed to support oversight of operational risks. 
The Grampian Operational Escalation System (GOPES) continues to be
utilised to assist in the identification of pressure points across the whole
system so that they can be addressed and prioritised appropriately. These
principals continue to be revisited across the system in Grampian. 
4.7 Recruitment and retention continues to provide challenges across all
disciplines. The Moray Health and Social Care Workforce Plan was approved
by MIJB on 29 Sep 2022 (section 12 minute refers to). Over the next three
years, the workforce plan will focus on the five key areas known as ‘pillars’;
they include, Plan, Attract, Train, Employ and Nurture staff. A report
discussing the challenges and plans of Recruitment and Retention was
presented to MIJB on 26 January 2023. 
4.8 As part of the ongoing work to ensure all patients are treated in ‘the right
place, at the right time’, HSCM Senior Clinical Leads led two days of audit
across Moray. The findings will be used to further develop plans across
Moray. 
4.9 The possibility of planned power outages raised by SSEN. Civil contingency
groups are discussing options and reviewing Business Continuity Plans to
ensure planning is underway. Additional support has also been funded by
HSCM to assist Primary Care planning. 
4.10 There continues to be significant financial risk in the system.  The 2021-22
audited financial accounts were signed off by MIJB 26 January 2023. It was
noted that the full impact of the clawback of the Covid reserve is not yet
quantifiable. A further update will be presented to MIJB in March 2023.
Page 12

Page 13

4.11 There continues a significant number of hours per week of unmet need for
care at home, with little change in these figures this year. There is an urgent
need to increase supply to support the Health and Social Care system.
Regular meetings and action plans continue to take place to support teams. 
4.12 As plans evolve, the Strategic Risk Register will continue to be updated to
ensure that it reflects any potential risks to realise the vision set out in our
Strategic Plan. 
5. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2022-2032”
The MIJB requires effective governance arrangements for those services
and functions delegated to it and Risk Management systems are integral
to this. 
(b) Policy and Legal
As set out in the terms of reference, the Board has responsibility to
provide assurance of the adequacy of the risk management framework. 
There are no legal implications arising from this report.  
(c) Financial implications
There are no direct financial implications arising from this report however
the Board should note the failure to manage risks effectively could have
a financial impact for the MIJB. 
(d) Risk Implications and Mitigation
This report forms part of the governance arrangements for identifying
and managing strategic risks of the MIJB.  The risks are outlined in the
body of the report in section 4. 
(e) Staffing Implications
There are no additional staffing implications arising from this report.   
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required because there are no
service, policy or organisational changes being proposed. 
(h) Climate Change and Biodiversity Impacts
There are no impacts arising from this report. 
(i) Directions
None arising from this report. 
(j) Consultations
Consultation on this report has taken place with the Senior Management
Team and presented to Clinical and Care Governance Group.
Page 13

Page 14

6. CONCLUSION 
6.1 This report and appendices contains proposed risk appetite statements
that, when approved, will underpin the MIJB approach to strategic
decision making.   
6.2 The report outlines the current position and recommends the Committee
note the revised and updated version of the Strategic Risk Register. 
Author of Report:  Sonya Duncan, Corporate Manager
Background Papers:   held by HSCM
Ref: 
Page 14

Page 15

Appendix 1 
HEALTH AND SOCIAL CARE MORAY STRATEGIC RISK REGISTER 
AS AT 23 January 2023 
Item 5.
Page 15

Page 16

Appendix 1 
RISK SUMMARY 
1. The Moray Integration Joint Board (MIJB) does not function as set out within the Integration Scheme, Strategic Plan and in-line
with Standing Orders and fails to deliver its objectives or expected outcomes.  
2. There is a risk of MIJB financial failure in that the demand for services outstripping available financial resources.  Financial
pressures being experienced by the funding Partners will directly impact on decision making and prioritisation of MIJB.
3. Inability to recruit and retain qualified and experienced staff to provide safe care whilst ensuring staff are fully able to manage
changes resulting from integration.
4. Inability to demonstrate effective governance and effective communication and engagement with stakeholders.
5. Inability to cope with unforeseen external emergencies or incidents as a result of inadequate emergency and resilience planning.
6. Risk to MIJB decisions resulting in litigation/judicial review.  Expectations from external inspections are not met.
7. Inability to achieve progress in relation to national Health and Wellbeing Outcomes.  Performance falls below acceptable level.
8. Inability to progress with delivery of Strategic Objectives and Transformation projects as a result of inability to resolve data sharing
and data security requirements.
9. Requirements for support services are not prioritised by NHS Grampian and Moray Council. 
RISK RATING LOW  MEDIUM HIGH  VERY HIGH
RISK MOVEMENT  DECREASE NO CHANGE INCREASE 
The process for managing risk is documented out with the MIJB Risk Policy. 
Page 16

Page 17

Appendix 1 
Description of
Risk: 
Regulatory
The Integration Joint Board (IJB) does not function as set out within the Integration Scheme, Strategic Plan and
Scheme of Administration and fails to deliver its objectives or expected outcomes.  
Lead: Chief Officer
Risk Rating:  Low/ medium/ high/ very high  MEDIUM
Risk Movement:  Increase/ decrease/ no change  INCREASING
Rationale for Risk
Rating: 
The strategic plan “Partners in Care” 2019 to 2029 was developed and launched in December 2022.  
Membership of IJB committees has recently changed due to the elections in May.  An amendment to the Scheme to
increase membership by one from each of the partner organisations was ratified in March 2022 by the Scottish
Government following due process and approval by Moray Council and NHS Grampian Board.
During the initial Covid 19 response, normal business was suspended and emergency arrangements were implemented. 
IJB, CCG and APR meetings restarted during August 2020.  Weekly meetings were instigated with Chair/Vice Chair and
Chief Officer and these continue.  A delivery plan for the new Strategic Plan “Partners in Care” 2019 to 2029 which will
be presented early 2023.
Rationale for Risk
Appetite: 
The Board, staff and providers across Moray are all committed to ensuring high standards of clinical care & governance
through operational policies.  Innovation and new ways of working may mean traditional regulations do not exist, or are
contradictory. 
We will only take regulatory risks knowingly, following consultation with the relevant regulatory body and where we have
clear risk mitigation in place. 
Controls: • Integration Scheme.
• Strategic Plan “”Partners in Care” 2019 to 2029
• Governance arrangements formally documented and approved by MIJB January 2021.
• Agreed risk appetite statement.
• Performance reporting mechanisms.
• Consultation with legal representative for all reports to committees and attendance at committee for key reports.
• Standing orders have been reissued to all members
Mitigating
Actions: 
Induction sessions were held for new IJB members after May elections. Further sessions will be arranged for recent
appointees.
IJB member briefings are held regularly as development sessions. 
Conduct and Standards training held for IJB Members in June 2022 provided by Legal Services.
1
Page 17

Page 18

Appendix 1 
SMT regular meetings and directing managers and teams to focus on priorities. 
Regular development sessions held with IJB and System Leadership Group
Strategic Plan and locality management structure is in place The work that has been progressed through the Covid19
response has escalated developments in some areas as a matter of priority.  This has been achieved through
collaborative working with partner organisations and the third sector. 
Assurances: • Audit, Performance and Risk Committee oversight and scrutiny.
• Internal Audit function and Reporting
• Reporting to Board.
• The Moray Transformation Board has recently recommenced and will support an oversight of planned business
across HSCM.
Gaps in
assurance:
Work is underway on the refresh of the Strategic delivery plan and will incorporate the work being taken forward for
Self-Directed support, Hospital at Home and ,  Locality Planning. A delivery plan is being developed alongside the
refreshed Strategic Plan. 
Current
performance:
The Scheme of Administration is reported when any changes are required.  
Legal advisors are currently working on the requirements to the integration scheme in relation to the proposed The
integrated scheme of delegation of Children’s and Families and Justice Services was presented and accepted by MIJB
on 26th January 2023.
The Governance Framework was approved by IJB 28 January 2021. Re-appointment of Standards Officer agreed by
IJB 31 March 2022.
Members Handbook has been updated and circulated to all members in June 2022.
Comments: Strategic Planning and Commissioning Group approved the generic Terms of Reference and Chairs of the
transformation boards at the meeting on 19 December 2019.  . These groups have now recently recommenced
following the pause during the Covid19 response. The interim Strategy and Planning Lead is now taking this forward
and prioritising and focusing on strategic planning and priorities over the short and longer term. 
2
Description of
Risk: 
Financial
There is a risk of MIJB financial failure in that the demand for services outstrips available financial resources.  Financial
pressures being experienced both by the funding Partners and Community Planning Partners will directly impact on
decision making and prioritisation of MIJB.
Lead: Chief Officer/Chief Financial Officer
Risk Rating:  Low/ medium/ high/ very high VERY HIGH
Risk Movement:  Increase/ decrease/ no change NO CHANGE
Page 18

Page 19

Appendix 1 
Rationale for Risk
Rating: 
Whilst the 2020/21 to 2022/23 settlement saw additional investment for health and social care that was passed through
to the MIJB, there remains a significant pressure due to the recurring core overspend, since most of the new investment
related to new commitments. 
Financial settlements are set to continue on a one year only basis, which does not support sound financial planning.  
In addition, many uncertainties have arisen relating to the carried forward ear marked reserves with the clawback of the
Covid reserve and reduction of the PSIF funding in 2022/23 as well as other funding being looked at.  The full impact is
not yet quantifiable. 
The Revenue Budget 2022/23 was approved by MIJB on 31 March 2022 as a balanced budget.  A small savings plan of
£0.11 million was approved and achieved.  Additional Scottish Government investment is provided again for 2022/23,
this is to meet additional policy commitments in respect of adult social care pay uplift for externally provided services and
seeks to ensure that capacity can be maximised and ensuring system flow.  The final outturn position will be finalised
and reported to the MIJB in June where it is anticipated there will be a small ear marked reserve.
The update medium Term Financial Framework was presented as part of the budget papers on the 31st March 2022
however, it is imperative that this is further reviewed during the 2022/23 year to ensure alignment with the upcoming
revisions to the Strategic Plan and is planned to be presented to MIJB on 30 March 2023.
Rationale for Risk
Appetite: 
The Board recognises the financial constraints all partners are working within. While we are cautious and open about
accepting financial risks this will be done: 
• Where a clear business case or rationale exists for exposing ourselves to the financial risk 
• Where we can protect the long term sustainability of health & social care in Moray   
The Covid-19 recovery continues to place risk on the MIJB finances as we continue through the, recover and transform
stages. Whilst we are now officially in the recovery phase there has been no change in the pressures felt by the
system..
Controls: There is an interim arrangement for CFO cover from Moray Council. Permanent recruitment efforts have not been
successful. The Chief Officer is working with both the Council and NHS Finance Leads to secure a longer term interim
arrangement. 
The CFO and Senior Management Team have worked together to address further savings which will be presented to
the Board for approval as part of the budget setting procedures for 2022/23.  This should be a focus of continuous
review to ensure any investment is made taking cognisance of existing budget pressures.  A revised Financial
Framework was presented to the MIJB on 31 March 2022, and a further review will take place once the current
strategic plan has been reviewed to assure alignment.
Mitigating
Actions: 
Risk remains of the challenge that the MIJB can deliver transformation and efficiencies at the pace required whilst dealing
with the pressures that are emerging as a result of the pandemic.    
Financial information is reported regularly to both the MIJB, Senior Management Team and System Leadership Group.
Page 19

Page 20

Appendix 1 
The Chief Officer and Chief Financial Officer (CFO) continue to engage in finance discussions with key personnel of both
NHS Grampian and Moray Council.  These conversations have continued throughout the pandemic phase. 
Chief Officer and CFO will continue to engage with the partner organisations in respect of the financial position throughout
the year. Cross partnership performance meetings are in with partner CEOs, Finance Directors and the Chair/Vice Chair
of the MIJB. 
Assurances: MIJB oversight and scrutiny of budget.  Reporting through MIJB, NHS Grampian Board and Moray Council.
Gaps in
assurance:
None known
Current
performance:
An overspend of £1,454,162 was reported to the IJB at 30 Sept 2022.
The Scottish Government have announced their intention to reclaim surplus Covid reserves, £6,239,000 is due to be
clawed back in January 2023.
Comments: Senior managers continue to work with Chief Officer and Chief Financial Officer to address the continuing financial
challenge, continuing to seek efficiencies and opportunities for real transformation as we look to make efficient and
effective investment in services that are truly transformational. There are additional pressures from the cost of living
crisis, increasing energy bills, inflation and the potential for staff industrial action. 
3
Description of
Risk: 
Human Resources
(People):
Inability to recruit and retain qualified and experienced staff to provide and maintain sustainable, safe care, whilst
ensuring staff are fully able to manage change resulting from response to external factors such as the impact of Covid
and the actions that arose from the recommendations from the Independent Review of Adult Social Care 2021.
Lead: Chief Officer
Risk Rating:  Low/ medium/ high/ very high HIGH
Page 20

Page 21

Appendix 1 
Risk Movement:  Increase/ decrease/ no change INCREASING
Rationale for Risk
Rating: 
There continues to be issues with recruitment to front line services that require specific skills and experience.  This has
been the case for some time now and continues to place pressure on existing staff.  Allied Health Professions, Social
Work and Nursing are some of the particular areas experiencing difficulties with obtaining people with the appropriate
skills and training. Care at Home staffing levels are pressured for Internal services and externally with local providers all
experiencing the same difficulties. 
There are also impacts on recruitment of Dentists and other graduates arising from Covid as the number graduating has
reduced during the period.
The various impacts of Covid-19 has  placed a significant strain on the Partnerships resources across frontline and
support functions and this has resulted in delays for the progress of projects relating to the achievement of strategic
objectives.  HSCM is currently has approximately 70 fixed term or seconded posts which can create long term instability
for teams. This is being reviewed by the Senior Management Team.
The Care Homes in Moray also face difficulties with recruitment and retention of staff to care at home roles in particular
is still being experienced.  Efforts are being made to provide support but the situation remains challenging. 
The transition from EU membership has not presented any specific concerns for workforce and this will continue to be
monitored. 
The impact of forthcoming budget allocations and the withdrawal of all Covid funding will also mean that HSCM will face
some challenging decisions in 2023.
The impact of budgetary decisions by the Council in relation to reducing staffing levels has reduced levels of support
provided in some key areas for Health and Social Care Moray (HSCM), such as ICT, HR, Legal and design.  
Rationale for Risk
Appetite:
Safety risks that could result in harm to service users, staff or the public are inherent in Health & Social Care services.
The safety of individuals is paramount therefore standards of safety management and clinical care have to be high, and
the Board will continue to seek assurances this is the case. 
The Board’s ambition is for health & social care to be people centred. This means supporting people in decision making
about their own health & care, which may expose individuals to higher risk where they make an informed decision. 
The Board will also seek to balance individual safety risks with collective safety risks to the community. 
Controls: Management structure in place with updates reported to the MIJB. 
Organisational Development plan in place and Workforce Plans are being updated to align to the new strategic plan. 
Continued activity to address specific recruitment and retention issues.   
Management competencies continue to be developed through Kings Fund training although this was suspended due to
Covid19. 
Page 21

Page 22

Appendix 1 
Communications & Engagement Strategy was approved in November 2019 and is being implemented.
Council and NHS performance systems in operation with HSCM reporting being further developed and information
relating to vacancies, turnover and staff absences is integral to this.  
Managers are highlighting any areas of concern and where appropriate this is identified in operational risk registers.
HSCM services have commenced weekly reporting of workforce sit reps for Senior Management Team oversight
highlighting vacancies, annual leave, sickness absence and Covid impacts so that issues can be identified and
assessed quickly.  
Mitigating
Actions: 
System re-design and transformation.  
Organisational Development Plan and Workforce plan were updated and approved by MIJB in November 2019. The
updated Workforce plan has been submitted to Scottish Government and comments were received by the HSCP in
October 2022. These are currently being worked through.  These plans are core documents for the Workforce Forum
which has recently re-commenced following a temporary suspension during the first quarter of this year due to Covid
impact. 
Staff Wellbeing is a key focus and there are many initiatives being made available to all staff including training, support,
information and access to activities. 
Locality Managers are developing the Multi-disciplinary teams in their areas and some project officer support has been
provided to develop the locality planning model across Moray.
Lead Managers are involved in regional and national initiatives to ensure all learning is adopted to improve this position.
Lead Managers and Professional Leads are linked to University Planning for intakes and programmes for future
workforce development. 
Assurances: Operational oversight by Moray Workforce Forum has resumed and will report to MIJB in accordance with the agreed
Governance framework.
The HSCM Response Group was in place over the whole period of the Covid19 pandemic providing focussed
leadership around emerging issues and resolving them.  This group stood up again in April and is meeting daily whilst
the system is pressured, this will be reviewed as the situation evolves.  The Heads of Service are co-ordinating and
escalate to SMT where necessary. These meetings have been increased as service needs dictate.
Gaps in
assurance:
Further work required to develop workforce plans to reflect strategic plan implementation programmes..
Current
performance: 
The IMatter survey results for 2022 were received by managers for review and action plans.  Preparatory work is
commencing on the action plans for iMatter 2023. 
Discussions are underway with HR in both Council and NHS to develop access to appropriate HR information at a
summarised level to facilitate the necessary workforce planning and subsequent monitoring of plans. 
Page 22

Page 23

Appendix 1 
There continues to be a need for more streamlining in recruitment processes as the delay in approval to recruit to having
a member of staff available is in excess of 8 weeks. 
There is also a lack of suitable applicants for various posts which is impacting on ability to appoint for some roles. 
Comments: Staffing issues are owned by the Systems Leadership Group who will work collaboratively across the system to seek
opportunities to make jobs more attractive where it has proved difficult to recruit in the past.   
For some professions there is a potential risk that staff move from one position to a new position within HSCM will just
move the vacancy to elsewhere in the system, so Senior Management Team are aware of this risk and taking it into
account in considerations for vacancies. This needs to be considered when fixed term contracts and secondments are
planned, consideration needs to be given to the whole of HSCM and not services in isolation. Many of our staff may have
transferrable skills and experience. 
The continuing system issues and lack of available beds may mean operations cannot be scheduled to reduce the backlog
and key staff may not have the necessary time in surgery to maintain essential skills.  This in turn may add to the staff
retention issues within certain specialties. 
4
Description of
Risk: 
Reputation:
Inability to demonstrate effective governance and effective communication and engagement with stakeholders. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high MEDIUM
Risk Movement:  increase/decrease/no change NO CHANGE
Page 23

Page 24

Appendix 1 
Rationale for Risk
Rating: 
Locality planning assessed as medium in relation to ability to work at the pace required and current workforce capacity. 
Performance framework to be further developed from a planning perspective to show the links through operational
service delivery to strategic objectives. 
Recent engagement with individuals representing their communities or third sector organisations in a variety of forums
is highlighting that problems with their capacity to fulfil our needs so more co-ordination and clearer focus is required to
ensure that the communication, engagement and outcomes are meeting identified needs.
Rationale for Risk
Appetite:
The Board is cautious but open about risks that could damage relationships with different stakeholders. It recognises
many of our aspirations depend on effective collaboration, coproduction and partnership working with a range of
stakeholders. The appetite also recognises that while the aspiration is to be a co-operative partner, some partners will
not be able to move at the same pace as us all the time. 
We will seek to protect relationships in the long term and will not set out to antagonise stakeholders deliberately. For
example, we must not be seen to exclude or prevent participation in the design of services where there is an appetite to
do this.   
We must be mindful that repairing relationships is easier when there is already a well of goodwill to draw on, and that
further damage to an already damaged relationship will not be conducive to good long term outcomes. 
Controls: Governance Framework approved by IJB January 2021
Communication and Engagement Strategy approved November 2019
Annual Governance statement produced as part of the Annual Accounts 2021/22 and submitted to External Audit. 
Annual Performance Report for 2021/22 was published in November 2022.
Performance reporting mechanisms in place and being further developed through performance support team, home first
group and system leadership team.
Community engagement in place for key projects areas such as Forres, Keith and Lossiemouth with information being
made available to stakeholders and the wider public via HSCM website.
Participation of stakeholders in a variety of meetings such as Home First project, carer strategy, Strategic, Planning and
Commissioning groups.
Mitigating
Actions: 
Schedule of Committee meetings and development days in place and implemented. 
Good working relationship established with Audit Scotland, the MIJB’s appointed external auditors since 2016/17.
Discussions at leadership meetings to ensure all standards are being met around Public Sector Equality Duty and
published where appropriate. There is a new programme of training to ensure all policies are Equalities Impact Assessed
and the findings are published.
Page 24

Page 25

Appendix 1 
Annual Performance Report for 2022/23 will be published in July 2023 after being presented to the IJB in June 2023.
Social media is actively used as a method of engaging with the public, with short videos focussing on particular
services being trialled. 
SMT have considered the existing arrangements for engagement with stakeholders and work is being undertaken to
align our framework with the Scottish Government “Planning with people guidance” and ensure that mechanisms are in
place across services to evidence and evaluate their impact.
Assurances: Oversight and scrutiny by Clinical and Care Governance Committee, Audit Performance and Risk Committee and
MIJB.  
Summary reports of minutes of MIJB meetings are submitted to Council committee and NHS Board.
Gaps in
assurance:
Progress on implementation of the Communication and Engagement Strategy has been impacted by the Covid 19. 
Due to the impact of COVID and requirement for social distancing the normal mechanism for engagement were not all
available.  More use is being made of social media and Microsoft teams and other options and methods for
engagement with staff are being used via NHSG such as videos on YouTube and one question surveys. 
Going forward there may be more opportunity for face to face meetings to take place again but it should be considered
that this will not be beneficial for all. It is anticipated that once a Communication and Engagement Officer and
supporting role are recruited.that this work stream will rapidly restart as a priority.
Current
performance:
Communications Strategy was reviewed approved by IJB November 2019.
Annual Performance Report 2021/22 published November 2022.  Audited Accounts for 2021/22 were audited and
approved in January 2023 and will be published in February 2023. 
Due to Covid19 there have been increased levels of briefings to staff, the public and Chair/Vice Chair of MIJB with a
focus on the key elements of the response.  
Comments: A communication cell was established as part of the Local Resilience Partnership Covid and storms response with
representation from Councils, HSCP and NHSG.  This was led by Aberdeen City Council and was an example of the
collaborative working that took place.  This forum provides assurance that messages to all stakeholders are consistent.   
There has been representation from the Home first project at the Wellbeing forum to facilitate sharing of information
and seeking views. 
Page 25

Page 26

Appendix 1 
5
Description of
Risk: 
Environmental:
Inability to cope with unforeseen external emergencies or incidents as a result of inadequate emergency and resilience
planning. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Due to the response requirements for Covid 19 progress has been made in a number of areas.  SMOC information is
updated, control room guidance updated and expanded, control centre protocols were implemented and remain in place
and management teams have responded in an agile, responsive and collaborative way under very challenging conditions. 
Teams continue to do their best but there are areas where they still feeling overwhelmed and service delivery is
challenging. 
With effect from March 2021 MIJB is defined as a Category 1 responder under the Civil Contingencies (Scotland) Act
and there are additional requirements for preparedness that is being taken forward in partnership with NHSG and Moray
Council emergency planners.
Rationale for Risk
Appetite:
The MIJB understand the requirement to meet the statutory obligations set out within the Civil Contingencies Act and
the Category 1 status applied in March 2021, and work with partner organisations to meet these obligations 
Controls: Winter Preparedness Plan was updated (but not tested as in previous years) alongside NHSG plans as NHSG
implemented their crisis management framework which required participation of partners at Daily connect meetings to
discuss and prioritise resource to address issues with system flow.
HSCM Civil Contingencies group established and meeting regularly to address priority subjects.
NHS Grampian Resilience Standards Action Plan approved (3 year).
Business Continuity Plans in place for some services although overdue a review in some areas.
Knowledge of critical functions and ability to respond quickly and effectively has been in evidence during incidents such
as Gas outages in Keith (January and February 2021) and Covid response, Storms (Arwen, Malik and Corrie) – debriefs
carried out and learning identified.
A Resilience Newsletter started in December 2022 to ensure all staff receive some personal resilience information
together with resources for teams to plan.
Regular updates to SMT and SLG regarding potential power outages across the country.
Regular system wide meetings to discuss potential Industrial Action implications and service planning. 
A review of the Festive season arrangements has commenced and will conclude in February 2023.
Page 26

Page 27

Appendix 1 
Mitigating
Actions: 
Information from the updated BIA/BCP informed elements of the Winter Preparedness Plan 
A Friday huddle is in place which gathers the status of services across the whole system to provide information and
contact details to the Senior Manager on Call (SMOC) over the weekend. If any potential issues are highlighted the
relevant Persons at Risk Data is compiled and if appropriate, shared with relevant personnel. 
NHSG have introduced system wide daily huddles to manage the flow and allocation of resources which require
attendance from Dr Grays and HSCM. 
Practitioner group established for Moray with representation from HSCM, Dr Grays, Moray Council and NHSG to
discuss matters arising from the Local Resilience Forum and within our respective organisations.  In addition it will
provide a forum for discussion of the linkages between organisational response plans to ensure there are no gaps or
over reliance on particular local resources. 
HSCM continues to monitor the local situation regarding impacts on staffing and is engaged with NHSG emergency
planning arrangements and Council Response and Recovery management team to be ready to escalate response if
required. Work was undertaken within NHSG, Aberdeenshire HSCP and Aberdeen City HSCP to look at Surge flows
and establish a mechanism that will provide easy identification of “hot spots” across the whole system in Grampian, to
facilitate a collaborative approach to addressing the issues through the use of a common Operational Pressure
Escalation approach.  This work could underpin surge responses in winter and at other times of pressure and having a
standard approach across Grampian could aid communication and understanding. 
Assurances: Audit, Performance and Risk Committee and NHS Grampian Civil Contingencies Group oversight and scrutiny.
HSCM Civil Contingencies group review specific risks and action plans to mitigate, developing plans and testing
arrangements in partnership with NHSG and Council
Gaps in
assurance:
Moray Integrated Joint Board (MIJB) was designated as a Category 1 responder under the Civil Contingencies Act 2004
from March 18th 2021. That designation imposed a number of statutory duties in terms of the Act and the associated
Scottish Regulations1.  MIJB has no dedicated, specialist in post and is reliant on the Corporate Manager covering this
increasingly demanding role in addition to other duties without the necessary background, knowledge, skills and
experience. This presents a potential organisational risk in terms of compliance and our ability to provide assurance on
discharging our civil contingency arrangements. This has been highlighted to the Chief Officer and IJB. 
1 Civil Contingencies Act 2004 (Contingency Planning) (Scotland) Regulations 2005
Page 27

Page 28

Appendix 1 
The debriefs from the storms in 2021/22 have identified lessons learnt for Grampian Local Resilience Partnership and
more locally for the response co-ordination within Moray.    Action plans are being developed in collaboration with Moray
Council’s emergency planning officer to address the issues identified.  The main issues related to developing wider
awareness of roles and responsibilities,   and improving general awareness of response structures and meeting protocols. 
This will be incorporated into training schedules going forward.  It has also highlighted the need for a robust arrangement
for out of hours contact and clarity of roles and responsibilities across the system which is being discussed at SMT.
Option Appraisal discussions have commenced. . 
Progress has been made however further work is required to address the targets in the implementation plan that have
not been met and the Resilience standards as identified by the NHSG Civil Contingencies Group. 
Due on ongoing system pressures and staff vacancies the draft strategy document ‘Care for People’ document and
associated response structures has been completed and is awaiting sign off by Senior Management involved, before
being presented to SMT, OMT and IJB. It is anticipated this will be completed by end February 2023., A draft operational
response plan has been drawn up and will also be presented for approval shortly after. 
The intention is to hold a table top exercise with managers from HSCM and Moray Council to test the invocation
arrangements to ensure common understanding of roles and responsibilities.
Table top style exercises are currently being arranged with some of those services who have submitted their finalised
plans for February 2023.
Current
performance:
The Senior Management Team participated in Strategic Leadership in a Crisis training in 2020 and a programme of
further training for the wider management team is scheduled. A follow up session was held in September 2022. 
Many services have business continuity arrangements and some are overdue for an update.  Work has progressed in
identification of a critical functions list for agreement by System Leadership Group that will inform planning
arrangements going forward.  There will need to be changes made to business continuity plans following the
implementation of additional ICT resources in services which have provided a greater deal of resilience for some
services and functions – albeit reliant on electricity supply.  A schedule of review and exercising of business impact
assessments and plans has been scheduled for this year across services. All services have been requested to prioritise
their Business Continuity planning with a particular lens on power outages. 
Annual report on progress against NHS resilience standards was reviewed by APR committee on 31 March 2022. 
Report on the implications of the designation as a Category 1 responder was presented to MIJB 25 November 2021. 
Page 28

Page 29

Appendix 1 
Work is currently underway to plan for possible National Power Outages across the UK. This is being co-ordinated
across Grampian to ensure all Partners are involved. It is also planned to provide additional resource to ensure our
Primary Care partners are informed and engaged in the process. 
Comments: The requirements of a Category 1 Responder continue to increase in demand placing increased pressures across
already overstretched services and managers. MIJB does not have a subject matter expert leading on these topics.  
Page 29

Page 30

Appendix 1 
6
Description of
Risk: 
Regulatory
Risk to MIJB decisions resulting in litigation/judicial review.  Expectations from external inspections are not met.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high MEDIUM
Risk Movement:  increase/decrease/no change INCREASING
Rationale for Risk
Rating: 
Considered medium risk due to the impact of Covid-19 and resultant efforts required to remobilise services and/or the
increase in workloads stretching a workforce that has been under sustained pressure for a considerable time. 
The ongoing impact of the Covid 19 pandemic is stretching resources to deliver care in the community across all
providers (internal and external) so there is a potential increased risk of expected standards not being achieved despite
the best efforts of all concerned.     
Rationale for Risk
Appetite: 
The Board, staff and providers across Moray are all committed to ensuring high standards of clinical care & governance
through operational policies.  Innovation and new ways of working may mean traditional regulations do not exist and
require to be developed, no longer apply, or are contradictory. 
We will only take regulatory risks knowingly, following consultation with the relevant regulatory body and where we have
clear risk mitigation in place. 
Controls: Clinical and Care Governance (CCG) Committee established and future reporting requirements identified
Clinical Risk Management and Practice Governance group has oversight of their respective professional standards and
feed into Clinical and Care Governance Group, which then escalates to CCG Committee as necessary.
High and Very High operational risks are reviewed by System Leadership Group monthly and a review of all risks will be
undertaken as part of the risk management framework.
A workshop took place in January 2023, ‘A conversation about Clinical Governance’. This will be followed by 3 more
workshops in 2023. 
Complaints and compliments procedures in place and monitored.  A review of the current complaints processes in HSCM
is being undertaken and information will be shared at one of three planned clinical governance workshops early 2023. 
Clinical incidents and risks are being reviewed on a weekly basis to ensure processes are followed appropriately and
consistently and responses are recorded in a timely manner.
Adverse events and duty of candour procedures in place and being actioned where appropriate and summary reports
submitted to CCG committee.
Page 30

Page 31

Appendix 1 
Reports from external inspections reported to appropriate operational groups and by exception to SMT for subsequent
reporting to CCG or Audit Performance and Risk Committee as appropriate, albeit there has been a reduction in some
areas of external inspection reporting during the Covid period due to social distancing restrictions 
Care Home Oversight Group meets to oversee and manage risks in care homes.
Children and Adult Protection services are being delivered and reported to their respective committee on a regular basis.
Mitigating
Actions: 
This risk is discussed regularly by the three North East Chief Officers. 
Additional resource has been allocated to support the analysis of information for presentation to CCG committee
All High and Very High risks are now brought before the senior management team in Moray. 
Process for sign off and monitoring actions arising from Internal and External audits has been agreed
Assurances: Audit, Performance and Risk and Clinical and Care Governance Sub-Committees oversight and scrutiny.
Governance Framework in place and operational. 
Gaps in
assurance:
Process for highlighting recurring themes or strategic expectations from external inspections requires further development
to ensure Committee has sight of significant issues. The vacancy of clinical governance co-ordinator has now been
appointed to and this will be part of their work programme. 
Current
performance:
External inspection reports are reviewed and actions arising are allocated to officers for taking forward. 
Two Days of Audit took place across Moray on 25th and 26th January, 2023 respectively. These were led by the Clinical
Service Leads. Any shared learning will be disseminated through the correct channels. 
A summary of inspections is included in the Annual Performance report.   
The level is marked as an increasing risk on the basis that services are under pressure with the issues with staffing
capacity and the need to focus on delivery of critical functions which may mean external inspection are not the priority
at this moment in time. 
The Adult Support Protection inspection took place in April/May and an action plan has been developed and is now in
place. 
Comments: No major concerns have been identified for HSCM services in any audits or inspections during 2021/22. 
Page 31

Page 32

Appendix 1 
7
Description of
Risk: 
Operational
Continuity and
Performance:
Inability to achieve progress in relation to national Health and Wellbeing Outcomes.   
Performance of services falls below acceptable level.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Potential impacts to the wide range of services in NHS Grampian and Moray Council commissioned by the MIJB arising
from reductions in available staff resources as budgetary constraints impact. 
Unplanned admissions and delayed discharges place additional cost and capacity burdens on the service.   
The level of delayed discharges has remained high, reflecting the sustained pressure in the system following the  Covid
-19 pandemic impact and the lack of availability of care in the community.  There are sustained focussed and collective
efforts by all those working in the pathway.  However this is a complex area and will require continued effort to realise
reductions and maintain them.   
Rationale for Risk
Appetite: 
The Board is cautious but open about risks that could affect outcomes that are priorities for people in Moray. There is a
slightly higher appetite to risks that may mean nationally set outcomes – that by design are not given a high priority in
Moray - are not met. There is new focus on addressing positive risk taking to ensure the most appropriate and timely
measure of care for the population of Moray, this is being supported through various work streams across the system. 
This will only be accepted where there is a clear rationale, and preferably also a way of demonstrating what the IJB is
doing to meet the aspiration the outcome was created for. 
Controls: Performance Management reporting framework. 
2022 to 2032 “Partners in Care” Strategic Plan approved and development of implementation plans underway.
Performance regularly reported to MIJB. Revised Scorecard being developed to align to the new strategic priorities.
Best practice elements from each body brought together to mitigate risks to MIJB’s objectives and outcomes.
Chief Officer and SMT managing workload pressures as part of budget process.
A daily Huddle and write up circulates the picture on performance across community and acute services for the
Portfolio and  service managers have a shared understanding of the pressures in the system and mitigations taking
place.  Work continues on  refinement of G-OPES (Grampian Operating Pressures and Escalation System) led by
Page 32

Page 33

Appendix 1 
NHSG but being developed locally to identify the triggers and resultant actions required in services to respond to
pressure points.
Mitigating
Actions: 
Service managers monitor performance regularly with their teams and escalate any issues to the System Leadership
Group (SLG) for further discussion to provide wider support, developing shared ownership and a greater understanding
across the whole system.   
Key operational performance data is collated and circulated daily to all managers.  A  Daily dashboard is held on
illuminate for managers to access to ensure any potential issues are identified quickly so action can be taken.  This
dashboard is being reviewed and will be further developed with the intention of further dashboards to provide a whole
system overview.  This has been discussed at SLG and agreed. 
Performance information is presented to the Performance sub group of Practice Governance Group to inform Social
Care managers of the trends in service demands so that resources can be allocated appropriately. 
Assurances: Audit, Performance and Risk Committee oversight. 
Operationally managed by service managers, summary reports to Practice Governance and clinical and care
governance group and to System Leadership Group.  Strategic direction provided by Senior Management Team. 
HSCM Response Group continues to meet and reviews the key performance information and actions that are required
to deliver the priority services.
Gaps in
assurance:
Development work in performance to establish clear links to describe the changes proposed by actions identified in the
Strategic Plan has recommenced but is at an early stage.  This will be progressed as the revised outcomes are
determined and associated KPI are identified.  Progress will be reported to future Board meetings.
Review of systems and processes will commence across HSCM to ensure they are fit for purpose and ensure that
there are no indirect consequences of structure changes resulting in any gaps in assurance processes. 
Current
performance:
The Covid19 pandemic impacted on all areas of the service and work is underway to take the learning and experience
gained during the response to collate performance information in dashboards to support mangers interpret the impact
of Covid19 on their services, now and going forward.
There are likely to be changes to ways of working and this may also have impact on the performance information
required. 
Comments: Locality profile information has been provided to Locality Steering Group/Locality Manager to inform potential priorities
for consideration in Localities and work will be taken forward regarding development of performance monitoring and
reporting of key performance indicators in relation to Localities once it has been determined what the intended
outcomes are.  Locality plans will be presented to the IJB early 2023. 
Page 33

Page 34

Appendix 1 
The delayed discharge group has produced an action plan for implementation and progress is being made.  
Practice Governance have reviewed their operational performance requirements and have a comprehensive data set
used to inform operational priorities.
The Home First priorities are being taken forward and updates are reported to this committee or MIJB on a regular
basis. 
Progress in this area has been hampered due to the increased demand for urgent or critical services requiring staff
resource to be prioritised to frontline service delivery. 
The Council has procured new modules for their performance reporting system Pentana and HSCM performance team
have been developing its use for reporting. 
8
Description of
Risk: 
Transformation
Inability to progress with delivery of Strategic Objectives and Transformation projects. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
There are many issues that will impact on the ability to progress to deliver Strategic Objectives. 
The Strategic Planning & Commissioning group has been refreshed and re-launched and key work is being progressed. 
There was an initial meeting held on 22 September 2021 to consider terms of reference and the proposed structure for
oversight, prioritisation and assurance in relation to key developments, their fit with IJB strategy and enabling elements. 
The interim appointment of the Strategic and Planning Lead provides capacity to take this forward and to align the
priorities arising nationally, Grampian-wide and locally. 
The remobilisation plan for HSCM services that were suspended or reduced is progressing with Providers services and
social work implementing the IJB decision to return to delivery of both substantial and critical eligibility criteria.  Work has
progressed risk assessments are completed and assessments have been or are in the process of being reviewed to
ensure equality.   
Page 34

Page 35

Appendix 1 
The impact of Covid 19 on the population of Moray is still not fully realised.  It is therefore not possible to predict the
extent of the impact on the ability to progress with delivery of Strategic Objectives.  There are some aspects that have
progressed very well such as introduction of Near Me consultations but there are others that are more difficult to progress. 
There is concern that due to the workloads and challenges over the last year that teams are weary and/or do not have
capacity at this moment in time, to progress with delivery of development plans at this moment in time.  In addition the
pandemic is still present in the community so services are still responding to the impacts it has for the population of
Moray.  Managers are working with teams to establish “readiness” and their capacity and sense of wellbeing and the
collated output will inform plans going forward. 
One key aspect to facilitate transformation is the need for progress in relation to ICT infrastructure, data sharing and data
security across the whole system.   Work was undertaken by NHS Grampian and partners to address the needs for ICT
kit and information during the response to Covid. 
Rationale for Risk
Appetite:
The Board has a high appetite for risks associated with delivery of transformational redesign. The following should be
considered when accepting these risks:
• We understand and can mitigate other risk types that may arise, e.g. safety or financial within appetite 
• Service users are consulted and informed of changes in an open & transparent way 
• We will monitor the outcome and change course if necessary   
Controls: It is recognised that there will be significant changes taking place in Social Work practice with the implementation of the
Self Directed Support standards and the move to outcomes based services, so governance arrangements are being set
up to facilitate the same type of oversight and communication that is in place for the Home First programme. 
Mitigating
Actions: 
Integrated Infrastructure Group previously established, with ICT representation from NHSG and Moray Council, to
consider and provide solutions to data sharing issues and ICT infrastructure matters which is an area that will be taken
forward alongside the Moray Growth Deal projects.  The Moray Transformation Board has recently restarted and will
link to all relevant groups. 
Assurances: Strict ICT and data sharing policies and protocols in place with NHS Grampian and Moray Council. 
Gaps in
assurance:
Transformation/implementation planning is in development and will inform outcomes and performance reporting on the
delivery of the strategic plan. 
Protocol for access to systems by employees of partner bodies are in place.
Information Management arrangements to be developed and endorsed by MIJB.
Page 35

Page 36

Appendix 1 
Process of identification of issue and submission to data sharing group requires to be reinforced to ensure matters are
progressed.
The strict information sharing protocols can cause issues when trying to work across system in an open and
transparent way. 
Smarter Working programmes are being progressed in partnership with Council and NHSG.
Current
performance:
Training programme to be developed on records management, data protection and related issues for staff working
across and between partners.   
Comments: Where national systems are involved it may not be possible to identify a solution however the issues will be able to be
raised at the appropriate level via the Grampian Data Sharing Group where all three partnerships are represented. 
Page 36

Page 37

Appendix 1 
9
Description of
Risk: 
Infrastructure
Requirements for support services are not prioritised by NHS Grampian and Moray Council.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Changes to processes and necessary stakeholder buy-in still bedding in. 
Moray Council is undertaking a Property review of office and depot accommodation and the potential impact for HSCM
services requires consideration.  The output was anticipated in October 2019 however due to changes with roles and
responsibilities within the Council however the paper has been out for consultation.  NHSG have advised that staff should
continue to work from home at present whilst policies and protocols are developed.  Moray Council have a dedicated MC
officer leading on a hybrid working plan with input from HSCM on their requirements. It is anticipated that this might
conclude end 2023. 
ICT infrastructure service plans in NHS Grampian and Moray Council are not yet visible to HSCM and development of
communication and engagement process is required. 
The impact of Covid has resulted in a change in ICT strategy for Moray Council.  Council employed staff requiring mobile
technology have now been provided with it and some staff are still working from home.
Rationale for Risk
Appetite: 
Low tolerance in relation to not meeting requirements.
Controls: Chief Officer has regular meetings with partners
Computer Use Policies and HR policies in place for NHS and Moray Council and staff. 
PSN accreditation secured by Moray Council 
Infrastructure Programme Board was established with Chief Officer as Senior Responsible Officer/Chief Officer
member of CMT. Process for submission of projects to the infrastructure board approved and implemented to ensure
appropriate oversight of all projects underway in HSCM.  The Board has only recently restarted, so in the interim,
project requests are being processed via Senior Management Team. The interim Strategy and Planning Lead will
support the Infrastructure Programme Board for Moray portfolio. 
Page 37

Page 38

Appendix 1 
Mitigating
Actions: 
Membership of the Board was reviewed and revised to ensure representation of all existing infrastructure processes and
funding opportunities.
Process for ensuring infrastructure change/investment requests developed
Dr Gray’s strategy (vision for the future) is being produced collaboratively with input from NHSG and HSCM
management. 
Assurances: Infrastructure Programme Board functions to provide robust governance and assurance that proposed projects have a
robust business case and meets requirements of the respective partner organisations.  This board reports to Strategic
Planning and Commissioning Group.  Both of these groups have been recently  refreshed and remobilised. 
Workforce Forum meeting regularly with representation of HR and unions from both partner organisations 
Gaps in
assurance:
Further work is required on developing the process for approval for projects so that they are progressed timeously.
Need to review all existing processes in relation to infrastructure changes/projects/investments and streamline to avoid
duplication of effort. 
Infrastructure Board is in development and priority issues are being addressed in relation to infrastructure and premises
risk. Due to staff changes this work will now be incorporated into other roles. This will likely mean that this work will
complete with other priorities of already busy roles. 
Legal services have reduced capacity to provide support due to budget cuts and vacancies so any requests may take
longer. 
Recruitment for vacancies takes considerable time due to various factors and is presenting a strain on services to maintain
normal service whilst covering vacancies.  There have been several posts that have had to go out to advert more than
once extending the time other staff are covering gaps. 
Current
performance:
No update.
Comments: Existing projects will be reviewed as part of the development of the transformation plans for the Strategic Plan to
ensure resources are being dedicated appropriately and aligned to the emerging Strategic priorities.  Our requirements
for support will be communicated via appropriate channels 
Page 38

Page 39

REPORT TO: MORAY INTEGRATION JOINT BOARD CLINICAL AND CARE
GOVERNANCE COMMITTEE ON 23 FEBRUARY 2023 
SUBJECT: COMPLAINTS REPORT FOR QUARTER 3, 2022/2023 
BY:  CHIEF NURSE, MORAY 
1. REASON FOR REPORT 
1.1. To inform the Committee of complaints reported and closed during Quarter 3 (1
October 2022 – 31 December 2022). 
2. RECOMMENDATION 
2.1. It is recommended that the Committee considers and notes the totals,
lessons learned, response times and action taken for complaints
completed within the last quarter. 
3. BACKGROUND 
3.1. Within Health and Social Care Moray (HSCM), complaints received by NHS
Grampian (NHSG) and Moray Council are recorded on 2 separate systems, in
accordance with the appropriate policy and procedure of these organisations. 
3.2. At the meeting on 27 February 2020 (para 7 of the minute refers), it was agreed
that a combined report from NHSG and Council complaints systems be
submitted to future meetings of the Committee.  At the Committee meeting on
27 August 2020 (para 14 of the minute refers) it was requested that the
procedures be explained to demonstrate the similarities and differences, if any.   
3.3. NHS and Local Authority (LA) Complaint Handling Procedure/Policy requires all
staff to deal with feedback and complaints in a person/client-centred way.  The
procedure has been developed working closely with the Scottish Public
Services Ombudsman (SPSO). There is a standard approach to handling
complaints across the NHS and Local Authority, which complies with the
SPSO's guidance on a model complaints handling procedure and meets all of
the requirements of the Patient Rights (Scotland) Act 2011, and accords with
the Healthcare Principles introduced by the Act. 
3.4. The complaints process followed by both NHSG and Moray Council have the
same target response timescales. Early resolution, or front line, complaints will
be responded to within 5 working days and complaints handled at the
Item 6.
Page 39

Page 40

investigation stage have a response time of 20 working days. Where it is not
possible to complete the investigation within 20 working days an interim
response should be provided with an indication of when the final response
should be provided. 
3.5. The decision as to whether the complaint is upheld or not will be made by the
manager or Head of Service.  If the person raising the complaint is not satisfied
with the outcome then they many contact the Scottish Public Services
Ombudsman (SPSO) for an independent review and assessment, however
prior to this, every effort is made to engage with the complainant to resolve the
matter to their satisfaction. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1. The CCG Committee is presented with quarterly complaints performance
information using the mandatory Key Performance Indicators (KPIs), published
by SPSO in March 2022.  These are: 
Indicator One  The total number of complaints received 
The sum of the number of complaints received at Stage 1
(this includes escalated complaints as they were first
received at Stage 1), and the number of complaints received
directly at Stage 2.
Indicator Two  The number and percentage of complaints at each stage
which were closed in full within the set timescales of five
and 20 working days
The number of complaints closed in full at stage 1, stage 2
and after escalation within MCHP timescales as % of all
stage 1, stage 2 and escalated complaints responded to in
full
Indicator Three  The average time in working days for a full response to
complaints at each stage 
The average time in working days to respond at stage 1,
stage 2 and after escalation
Indicator Four  The outcome of complaints at each stage 
The number of complaints upheld, partially upheld, not
upheld and resolved at stage 1, stage 2 and after escalation
as % of all complaints closed at stage 1, stage 2 and after
escalation 
4.2. The qualitative indicator on learning from complaints has been removed.
However, Part 4 of the SPSO Model Complaints Handling Procedure on
Governance stresses the importance of learning from complaints, and the
requirements to record and publicise learning.  Therefore learning from
complaints will be continue to be included in quarterly complaints performance
reports and annual complaints reports. 
Page 40

Page 41

4.3. HSCM Complaints performance data for Quarter 3 is attached at Appendix 1. 
4.4. Information about complaints referred to the Ombudsman are also included
along with any complaints relating to the actions and processes of Moray
Integration Joint Board. 
4.5. Figures reported do not include complaints raised regarding the vaccination
appointments or processes as these are being dealt with through a dedicated
team covering the Grampian area. Any complaints or comments regarding the
Fiona Elcock Vaccination Centre in Elgin will be included in reported figures. 
4.6. Overall, a total of 24 complaints were received during Quarter 3. 
Total
Received
Q1
Total
Closed
Q1
Total
Received
Q2
Total
Closed
Q2
Total
Received
Q3
Total
Closed
Q3
LA 9 4 7 5 4 6
NHS 17 17 25 16 20 30 
26 21 32 21 24 35 
4.7. The small spike in NHS complaints received in Q2 was due to an slight
increase in complaints regarding GMED service.  GMED activity is increasing
with 2022 being the busiest year with 92020 cases recorded. This increase in
clinical demand could be a reflection of daytime practice pressures. 
4.8. The clinical governance team have supported service managers to conclude
the investigation of complaints and encouraged teams to prioritise complaints
handling; this has resulted in a significant increase in the number of complaints
closed during Q3.  It should be noted that from the 30 closed (NHS) complaints
2 were closed as consent was not received and 1 was closed as it was a
duplicate record. 
4.9. The table below sets out HSCM complaints received and closed by Quarter: 
21
18
15
23
32
18 17
26
32
25
15 14
19
24 22 22 21 21
0
5
10
15
20
25
30
35
Q2 20/21 Q3 20/21 Q4 20/21 Q1 21/22 Q2 21/22 Q3 21/22 Q4 21/22 Q1 22/23 Q2 22/23
Received Closed
Page 41

Page 42

4.10. There were 9 MP/MSP enquiries received and recorded on the Council system,
Lagan, under HSCM.  These were allocated as follows: 
Service Number of Enquiries
Care at Home 3
Occupational Therapy 3
Access Team 2
Moray West 1 
4.11. Enquiries have been received from MPs/MSPs and Councillors direct to
managers in HSCM, at this stage it is not possible to accurately report on
numbers received due to these enquiries not all being logged centrally.
Processes for recording these appropriately are currently being defined to
support effective feedback, prevent duplication and aid identification of trends
and learning for all services.  A segment at one of the future Clinical and Care
Governance Workshops will be dedicated to complaints and enquiries handling.   
4.12. Any complaints received from MP/MSPs on behalf of constituents are recorded
on Datix and captured in the data provided at Appendix 1. 
4.13. Four comments/suggestions were received during Quarter 3 and recorded on
Datix, these were all in relation to the Fiona Elcock Vaccination Centre, Elgin. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
As set out within Annex C of the Health and Social Care Integration
Public Bodies (Joint Working) (Scotland) Act 2014 Clinical and Care
Governance Framework. 
Effective handling of complaints is used to ensure the efficient and
sustainable delivery of services to meet priorities. 
(b) Policy and Legal
Clinical and Care Governance requirements are set out within the Moray
Health and Social Care Integration Scheme. Appropriate arrangements must
be in place to ensure and evidence good governance in meeting duties under
the Public Bodies (Joint Working) (Scotland) Act 2014. 
(c) Financial implications
None directly associated with this report. 
(d) Risk Implications and Mitigation
There are systems and processes in place across service areas to support
clinical governance, providing assurance to the HSCM Senior Leadership
Team and to the Clinical and Care Governance Committee. There are
platforms within Health and Social Care to discuss and share good practice,
learning and challenges. 
Page 42

Page 43

Moray Integration Joint Board (MIJB), Moray Council and NHS Grampian
could find themselves exposed to significant risks if good governance is not in
place.  The purpose of this report is to oversee the processes to ensure that
appropriate action is taken in response to adverse events, scrutiny
reports/action plans, safety action notices, feedback, complaints and litigation,
and those examples of good practice and lessons learned are disseminated
widely. 
(e) Staffing Implications
This activity is core to all practitioners in the front line both in terms of their
professional competence and assurances in care delivery.   
(f) Property
None directly arising from this report. 
(g) Equalities/Socio Economic Impact
Not required as there are no changes to policy. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions
None directly arising from this report. 
(j) Consultations
Consultations have been undertaken with the following staff who are in
agreement with the content of this report where it relates to their area of
responsibility: 
• Corporate Manager
• Tracey Sutherland, Committee Services Officer, Moray Council 
• Clinical and Care Governance Group 
6. CONCLUSION 
6.1. This report provides a summary of HSCM complaints received and closed
during Quarter 3 (1 October – 31 December 2022).  The governance and
monitoring of complaints forms part of core business for teams and
services and the provision of a good quality, effective and safe service is
a key priority for all.   
Author of Report: Isla Whyte, Interim Support Manager
Background Papers:  with author 
Ref: 
Page 43

Page 44

Page 44

Page 45

APPENDIX 1
Complaints Data (by closed complaints)
Quarter 3 (01/10/22 – 31/12/2022) 
Learning from complaints 
Teams and services actively review the outcomes of complaints to see where improvements can be made and learn from the feedback, with a view to reducing the
number of complaints in future.  The tables 1, 2, 3 and graph 1 below set out the stages the complaints were closed and what the complaint was about and what
action taken.  
Table 1
Complaints Information Extracted from Datix – Actions Taken/Outcome of complaints closed during Quarter 3, 2022/23  
Fully upheld:
Complaint is accepted
Partially upheld:
Complaint is partly
accepted
Not upheld:
Complaint is not
accepted
Consent not
received: Consent
form not received
from patient
Total
Action plan(s) created and instigated 1 0 0 0 1
Communication - Improvements in communication staff-staff or staff-
patient 
9 3 1 0 13
Education/training of staff 2 0 0 0 2
No action required 0 0 10 2 11
Risk issues identified and passed on 2 0 0 0 2
Share lessons with staff/patient/public 5 0 0 0 5
Waiting - Review of waiting times 2 0 0 0 2
Total 21 3 11 2 37*
*this figure does not represent number of complaints closed 
Item 6.
Page 45

Page 46

Table 2
Complaints Information Extracted from Lagan:
6 complaints were closed during Quarter 3, 2022/23.  
Directorate Department Service Upheld Partially Upheld Not
Upheld
Resolution Grand Total
Health and Social
Care Moray
Health and Social
Care Moray
Access Team 0 1 0 0 1
Care at Home 0 0 1 0 1
Drug and Alcohol 0 0 1 0 1
Occupational Therapy 0 1 1 0 2
TMC Specialist Unit 0 1 0 0 1
Graph 1 
0
2
4
6
8
10
12
14
16
Allied Health
Professionals
Community
Hospital
Nursing
Community
Nursing
GMED MacMillan
Nursing
Service
Mental
Health -
Adult Mental
Health
Public Dental
Service
Complaints Closed by Service Qtr 3 (datix)
Page 46

Page 47

Table 3
Complaints Information Extracted from Datix – Action Taken by Service (complaints closed during Quarter 3, 2022/23)  
Allied Health
Professionals
Community
Hospital
Nursing
Community
Nursing
GMED MacMillan
Nursing
Service
Mental Health
- Adult Mental
Health
Public Dental
Service
Total
Action plan(s) created and
instigated 0 0 0 0 0 1 0 1
Communication - Improvements in
communication staff-staff or staff-
patient  0 1 1 7 1 3 0 13
Education/training of staff 0 0 0 1 0 1 0 2
No action required 1 0 0 5 0 5 1 11
Risk issues identified and passed
on 0 0 0 2 0 0 0 2
Share lessons with
staff/patient/public 0 1 0 4 0 0 0 5
Waiting - Review of waiting times 0 0 0 2 0 0 0 2
Total 1 2 1 21 1 10 1 37*
*this figure does not represent number of complaints closed
Active review of complaints through reporting and investigation is a useful tool to identify learning and improve services.   Below are some of the actions and
learning from recent complaints. 
Actions and Lessons Learned (datix)
Action Plan Work with colleagues across Grampian with aim of standardising a Grampian wide pathway for ADHD diagnosis and treatment.
Communication Staff reminded of the important of using official NHS Grampian publications for checking the opening hours of contractors.
Review and improve protocol for call management
Education/Training Telephone call handling training and support given to staff 
Staff reminded of the need for timely note keeping 
Learning Outcome (lagan) 
• Ensure policies and procedures are reviewed and that managers support staff to undertake particular training to improve service delivery 
Page 47

Page 48

Indicator 1 – The total number of complaints received  
The sum of the number of complaints received at Stage 1 (this includes escalated complaints as they were first received at Stage 1), and the number of
complaints received directly at Stage 2. 
Table 4 – Total number of complaints received in Quarter 3, 2022/23
System recorded Early Resolution / Frontline Investigation Not Marked Total
NHS - Datix 3 marked early resolutions 17 marked investigation 0 20
Moray Council - Lagan 2 marked frontline  1 marked investigative  1 not yet marked 4
Total  5 18 1 24 
Table 5 – Allocation of complaints received in Quarter 3, 2022/23
NHS Service - Datix 
GMED 8
Community Nursing 2
AHP 3
Adult Mental Health 7
Total 20 
Table 6 – Allocation of complaints received in Quarter 3, 2022/23
MC Service - Lagan 
Drug & Alcohol 1
Occupational Therapy 1
Access Team 2
Total 4 
Page 48

Page 49

Indicator 2 - The number and percentage of complaints at each stage which were closed in full within the set timescales of five and 20 working days
The number of complaints closed in full at stage 1, stage 2 and after escalation within MCHP timescales as % of all stage 1, stage 2 and escalated complaints
responded to in full 
There were 30 Complaints closed on the NHS system Datix during Quarter 3, 2022/23 – breakdown as follows:
Early Resolution – 3 
Investigation – 26 (2 were closed as consent not received, 1 closed as duplicate record) 
Ombudsman – 1 
There were 6 Complaint closed on the MC system Lagan during Quarter 3, 2022/23 – breakdown as follows:
Frontline – 3
Investigation – 3
No complaints were escalated 
Table 7 – number and percentage of complaints at each stage closed within timescales (based on complaints closed during Quarter 3, 2022/23) 
Frontline/Early Resolution within timescale Investigation within timescale
NHS - Datix 3 out of 3 (100%) 2 out of 23 (8.7%)
Moray Council - Lagan 0 out of 3 (0%) 2 out of 3 (66.7%)   
Whilst HSCM aim to respond to complaints within timescales this is not always achievable.
Complaints received into Datix are often multi-faceted and include more than one service across NHS Grampian and other sectors, which can impact on
response times due to the level of investigation and coordination required. 
Indicator 3 - The average time in working days for a full response to complaints at each stage 
Page 49

Page 50

Table 8 – average time in working days to respond at stage 1, stage 2 and after escalation (based on complaints closed during Quarter 3, 2022/23) 
Frontline Investigative
NHS - Datix 1 days 44 days
Moray Council - Lagan 9 days 20 days 
Page 50

Page 51

Indicator 4 - The outcome of complaints at each stage 
The number of complaints upheld, partially upheld, not upheld and resolved at stage 1, stage 2 and after escalation as % of all complaints closed at stage 1, stage
2 and after escalation
Graph 2 below shows the amount of complaints fully upheld, partially upheld and not upheld as recorded in Datix during Quarter 3, 2022/23.  Out of 30 closed
complaints on the system, 1 was a duplicate and 2 consent was not received. 
From the remaining 27 complaints closed during Quarter 3 - approximately 44% were upheld, 15% were partially upheld and 41% were not upheld 
Complaints Information Extracted from Lagan:
0
2
4
6
8
10
12
Early Resolution Investigation Ombudsman
Complaints Outcome (datix)
Fully Upheld: Complaint is accepted Partially Upheld: Complaint is partly accepted
Not Upheld: Complaint is not accepted
Page 51

Page 52

6 complaints were closed during Quarter 3, 2022/23: 50% were partially upheld and 50% were not upheld. 
There were 0 Fully Upheld complaints.  0 complaints were escalated. 
Graph 3 below shows the amount of complaints upheld, partially upheld and not upheld as recorded in Lagan from the 6 closed complaints during Quarter 3,
2022/23. 
0
0.5
1
1.5
2
2.5
Early Resolution Investigation
Complaints Outcome (lagan)
Fully Upheld: Complaint is accepted Partially Upheld: Complaint is partly accepted
Not Upheld: Complaint is not accepted
Page 52

Page 53

REPORT TO: MORAY INTEGRATION JOINT BOARD CLINICAL AND CARE
GOVERNANCE COMMITTEE ON 23 FEBRUARY 2023 
SUBJECT: HEALTH AND SOCIAL CARE MORAY (HSCM) CLINICAL AND
CARE GOVERNANCE GROUP ESCALATION REPORT FOR
QUARTER 3, 2022/23 
BY:  CHIEF NURSE, MORAY 
1. REASON FOR REPORT 
1.1. To inform the Clinical and Care Governance Committee of progress and
exceptions reported to the Clinical and Care Governance Group during quarter
3 of 2022/23 (1 October up to 31 December 2022). 
2. RECOMMENDATION 
2.1 It is recommended that the Committee consider and note the contents of
the report. 
3. BACKGROUND 
3.1. HSCM Clinical Governance Group was established as described in a report to
this Committee on 28 February 2019 (para 7 of the minute refers). 
3.2. The assurance framework for clinical governance was further developed with
the establishment of the Clinical Risk Management Group (CRM) as described
in a report to this committee on 30 May 2019 (para 7 of the minute refers). 
3.3. As reported to this Committee on 29 October 2020 (para 5 of the minute refers)
Social Care representatives attend the Clinical Governance Group so the group
was renamed HSCM Clinical and Care Governance Group.  The group is co-
chaired by Fiona Robertson, Chief Nurse (Interim) - Moray and Tracy Stephen,
Head of Service/Chief Social Work Officer. 
3.4. The agenda for the Clinical and Care Governance Group follows a 2 monthly
pattern with alternating agendas to allow for appropriate scrutiny of agenda
items and reports.  A reporting schedule for Quality Assurance Reports from
Clinical Service Groups / departments is established. This report contains
information from these reports and further information relating to complaints
and incidents / adverse events reported via Datix; and areas of concern / risk
and good practice shared during the reporting period.  Exception reporting is
utilised as appropriate. Since April 2020, the 3 minute brief template has been
Item 7.
Page 53

Page 54

used for services to share their updates; this approach has resulted in positive
feedback from service managers and group members. 
3.5. The Clinical and Care Governance Group have met twice during this reporting
period. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
Audit, Guidelines, Reviews and Reports
4.1 Relevant Audits, Guidelines Reviews and Reports are tabled and discussed.
These include local and national information that is relevant to HSCM, for
example, recommendations from Health Improvement Scotland (HIS) reports
from other areas which require to be discussed and assurance given that
services in Moray are aware of these and have process in place to meet/
mitigate these recommendations.  Overview from Quarter 3 2022/23 is listed
below:
• CRM Minutes
• HIS – Benchmarking clinical governance structure and organisation
• Service Updates:
• GMED
• Pharmacy
• Moray Integrated Mental Health Services
• Adults with Incapacity
• Adverse Events and DoC
• HSCM Risk Register
• Complaints / Feedback 
• Update from Practice Governance Group 
Areas of achievement / Good Practice
4.2 At the last Committee meeting GMED reported working on improving the quality
of the service that is provided to patients across NHS Grampian and a number
of initiatives were described.  Updates have been added in, in bold, below:   
• Working with various stakeholders, including Scottish Ambulance
Service (SAS), NHS24, Emergency Department (ED) and Mental Health
to identify how patient pathways can be streamlined to ensure quality of
patient care is improved.  GMED continues to work with stakeholders
on patient pathways and professional to professional calls. Of note
is a recent review of incident investigation and a concerted effort to
improve communication between GMED and stakeholders to bring
faster and more effective resolutions to complaints and adverse
events.  
• Regular Continuing Medical Education (CME) sessions are organised for
the clinical team to ensure national clinical standards and guidelines are
shared and reliably implemented within GMED for a specified condition. 
These are ongoing and aim to continuously ensure that patients
receive evidence-based and consistent care.
• Patient surveys to measure patient satisfaction with the quality of care
provided by GMED service and clinical note audits – Patient survey
audits are pending, and a report of the outcome will be submitted
when operational conditions allow.  
Page 54

Page 55

4.3 GMED has continued to face challenges in relation to out of hours (OOH)
however the appointment of an OOH Lead Nurse (5 September 2022) has
taken place and they will carry out the following functions: 
• Line manager for 26 WTE Advanced Nurse Practitioner workforce
• Developing of learning, training and development programmes for
ANPs and other staff
• Leading unscheduled care agenda
• Management of complaints and adverse events
4.4 The GMED service has been reviewing redirection and referral pathways out
with NHS 24 pathways since August 2022. This is part of unscheduled care
improvement work in response to the increased demands being experienced in
Grampian and indeed across all unscheduled care services in NHS Scotland. 
4.5 Up until the start of the review, multiple services in the OOH period were able to
refer to GMED, which was not in line with national protocols.  Such redirection
pathways created an unprecedented pressure on the GMED service by
allowing all professional to professional referrals to be accepted with a one hour
priority, very often with no clinical indication for this.  This led to lack of equity
and fairness in how various patients access the service and these reviews are
the improvement work by GMED to address these challenges 
4.6 GMED have engaged with various stakeholders across Grampian to build up
an awareness of the redirection pathways, as well as to review and update
existing protocols to ensure clinical effectiveness and safe, person centred
care. 
4.7 To date, the GMED service have addressed pathways for care homes referrals
with early indications suggesting this is working well. In July 2022, the service
received 361 referrals from care homes, in contrast following improvement
work, with November 2022 – 36 referrals were received 
Moray Integrated Mental Health Services
4.8 The manner in which Moray Integrated Mental Health Services manages and
delivers clinical governance and positive and effective complaints has been
identified through benchmarking to be excellent and will be used as a “best
practice” model throughout Moray. 
4.9 Staffing – successful recruitment is continuing to improve staffing within the
service 
Pharmacy
4.10 Recruitment going well – there will be a full quota of pharmacists and
technicians as set out in the original plan. This process continues to move
forward successfully. The programme of training and implementation of
prescribing ability for pharmacists in Moray is nearing completion and it is
anticipated that this will have a positive effect on the service.   
Clinical and Care Governance Developments
4.11 The schedule of workshops to reframe and drive continual improvement
throughout the clinical governance framework in Moray is underway with a
positive 1st workshop having been completed.   
Page 55

Page 56

4.12 Further workshops have been scheduled to work around the framework –
particularly in relation to strengthened joint working between the health and
social care teams in how they monitor and communicate data around Clinical /
Care / practice governance. Improvements are designed to drive fast fail cycles
and to imbed preventative action and ongoing meaningful change in HSCM
ways of working.   
4.13 Secondary to this will be two open workshops for leaders relating to learning
and understanding which underpins the theory behind the key proactive risk
management process – Managing Risk Reduction Projects and reactive risk
management process – Incident Investigation. 
4.14 Benchmarking has been ongoing in relation to HIS, within NHSG and other
trusts in terms of reviewing and adopting best practice in clinical governance. 
4.15 Through routine monitoring of adverse events within community hospitals it has
been noted there has recently been a spike in the number of falls within Moray
Community Hospitals.  The newly appointed Interim Clinical Governance (CG)
Coordinator will be working directly with teams in Community Hospitals to
create and implement effective strategies to care for those patients who are
vulnerable to having falls. This project is progressing. 
4.16 Adults with Incapacity – The team have successfully mitigated key staff
shortages relating to capacity assessments and are currently working to design
and implement a permanent solution to deliver this service within Moray.   
4.17 ADAPT – The children and families team continue to work towards
improvements in relation to ADAPT.  This work is ongoing and a priority for the
team.  The results of this work will be reported, as the improvements are
implemented. 
Clinical Risk Management (CRM)
4.18 The Clinical Risk Management (CRM) group meet every 2 weeks to discuss
issues highlighted on the HSCM Datix dashboard.  This includes Level 1 and
Level 2 investigations, Complaints, Duty of Candour and Risks. 
4.19 The group is attended by members of the senior management team, clinical
leads, chief nurse and relevant service managers / consultants.  The purpose is
to ensure that senior managers are assured of the standards of services and
that where necessary investigations are carried out appropriately and learning
opportunities identified. 
4.20 An action log is produced following each meeting and is administered and
monitored. Individual services can be invited to attend to offer further scrutiny
and assurance.  It has been agreed that the action log and updates will be
presented and discussed at HSCM Systems Leadership Group (SLG) on a
monthly basis.  This will allow clear escalation process for any ‘High’ or ‘Very
High’ risks that are identified.  This will also ensure SLG have oversight of all
‘High’ and ‘Very High’ risks held by HSCM. 
4.21 The Interim CG Coordinator will coordinate CG intelligence to inform the
partnership of local risks relevant to patient safety, providing information to
Clinical Leads, Service Managers and local governance groups and
Page 56

Page 57

committees.  A schedule of meetings for CRM group are now resumed on a
fortnightly basis following the Christmas break period.   
Complaints and Feedback 
4.22 HSCM complaints information for Quarter 3, 2022/23 is included in a separate
report on today’s agenda. 
Page 57

Page 58

Adverse Events 
4.23 Adverse Events by Category and Level of Review Reported on Datix (Quarter 3, 2022/23) 
Level 3 - local review by line
manager in discussion with staff
Level 2 - local
management team
review Total
Abusive, violent, disruptive or self-harming behaviour 82 1 83
Access, Appointment, Admission, Transfer, Discharge (Including
Absconders) 23 1 24
Accident (Including Falls, Exposure to Blood/Body Fluids,
Asbestos, Heat, Radiation, Needlesticks or other hazards) 129 0 129
Consent, Confidentiality or Communication 5 1 6
Diagnosis, failed or delayed 2 0 2
Financial loss 4 0 4
Fire 3 0 3
Implementation of care or ongoing monitoring/review (inc.
pressure ulcers) 8 3 11
Infrastructure or resources (Staffing, Facilities, Environment, Lifts) 7 0 7
Medical device/equipment 3 0 3
Medication 28 0 28
Other - please specify in description 19 1 20
Patient Information (Records, Documents, Test Results, Scans) 2 0 2
Security (no longer contains fire) 5 0 5
Treatment, Procedure (Incl. Operations or Blood Transfusions
etc.) 3 0 3
Total 323 7 330 
Page 58

Page 59

Adverse Events 
4.24 Adverse Events by Type and Result Reported on Datix (Quarter 3, 2022/23) 
0
20
40
60
80
100
120
140
160
180
200
Adverse events by category and level of review
Near Miss (event prevented)
Event resulted in NO injury, harm or ill-health
Event resulted in injury, harm or ill-health
Page 59

Page 60

4.25 Adverse Events by Service and Level of Review Reported on Datix (Quarter 3, 2022/23) 
Level 3 - local review by line
manager in discussion with staff
Level 2 - local management team
review Total
Allied Health Professionals 18 1 19
Community Hospital Nursing 87 0 87
Community Nursing 19 4 23
Community Pharmacy 1 0 1
Community Therapy Services 1 0 1
General Practice 5 0 5
GMED 14 0 14
Grampian Diabetes & Heart Failure Nurses MCN 1 0 1
Mental Health - Adult Mental Health 86 2 88
Mental Health - Learning Disabilities 1 0 1
Mental Health - Old Age Psychiatry 74 0 74
Mental Health - Specialisms 4 0 4
Primary Care 4 0 4
Public Dental Service 8 0 8
Public Health 1 0 1
Total 324 7 331 
Page 60

Page 61

4.26 Adverse Events by Type and Severity Reported on Datix (Quarter 3, 2022/23) 
NEGLIGIBLE:
Negligible/no injury
or illness,
negligible/no
disruption to
service,
negligible/no
financial loss
MINOR: Minor
injury or illness,
short term
disruption to
service, minor
financial loss
MODERATE:
Significant injury,
externally
reportable e.g.
RIDDOR, some
disruption to
service, significant
financial loss
EXTREME: Death
or major
permanent
incapacity,
permanent loss of
service, severe
financial loss Total
Breach of Information / IT Security 7 0 0 0 7
Patient / Client / Resident 232 38 5 1 276
Staff (including Volunteers) 22 12 0 0 34
Student or Trainee 0 2 0 0 2
Visitors, Relatives or member of the Public  6 2 0 0 8
Provision of Service 6 3 0 0 9
Property / Equipment 10 2 0 0 12
Further consideration of circumstances of death
required 0 1 0 0 1
Total 283 60 5 1 349 
Page 61

Page 62

4.27 All adverse events by result by Quarter 
2020/21
Quarter 1
2021/22
Quarter 2
2021/22
Quarter 3
2021/22
Quarter 4
2022.23
Quarter 1
2022.23
Quarter 2
2022.23
Quarter 3
Occurrence with NO injury, harm or ill-
health 193 239 271
189 218 214 283
Occurrence resulting in injury, harm or
ill-health 80 61 87
79 89 98 78
Near Miss (occurrence prevented) 34 37 25 31 29 40 38
Property damage or loss 0 0 0 0 0 0 0
Death 0 0 1 0 0 0 0
Total 307 337 383 299 336 352 349 
4.28 Adverse Events by Severity Reported on Datix by Quarter 
2020/21
Quarter 1
2021/22
Quarter 2
2021/22
Quarter 3
2021/22
Quarter 4
2022.23
Quarter 1
2022.23
Quarter 2
2022.23
Quarter 3
Negligible 234 281 308 231 259 264 283
Minor 66 48 72 64 70 78 60
Moderate 6 8 2 2 4 8 5
Major 1 0 0 2 1 2 0
Extreme  0 0 1 0 2 0 1
Total 307 337 383 299 336 352 349 
All adverse events have the appropriate level of investigation implemented.
Page 62

Page 63

Findings and Lessons Learned from incidents and reviews:
4.29 A Level 1 review consists of a full review team who have been commissioned    
to carry out a significant event analysis and review, reporting findings and
learning via the division/ service governance structures. 
4.30 There are currently 5 Level 1 reviews in progress (at the time of reporting). 
HSCM Risk Register
4.31 New risks identified on Datix are discussed at CRM.  There have been 0 new
risks reported during Quarter 3.   
4.32 There are 3 “Very High” risks currently on the register. These are being
closely monitored by the CRM and senior management team. 
4.33 Each Clinical Service Group/Department highlights risks associated with their
service, which are then discussed at CRM.  The risk register is routinely
reviewed with leads with guidance and support provided regarding updates.
An exercise is underway to review and improve this process.  This will involve
an in-depth analysis of the existing structure, working closely with teams, to
develop a more streamlined process for the management of risk across the
partnership. 
Duty of Candour 
4.34 2 events were considered for Duty of Candour (DoC) during Quarter 3, these
are both still under investigation.   
Items for escalation to the Clinical and Care Governance Committee
4.35 Optometry patients with worsening vision problems in Moray have been
adversely affected by the cessation of cataract surgery services at Dr Gray’s
Hospital due to ongoing theatre issues.  The Optometry Team continue to
examine possibilities for theatre availability for cataract surgery to be made
available. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Moray Partners in Care 2022-2032”         
As set out within Annex C of the Health and Social Care   
Integration Public Bodies (Joint Working) (Scotland) Act 2014       
Clinical and Care Governance Framework.  
(b) Policy and Legal
Clinical and Care Governance requirements are set out within the Moray             
Health and Social Care Integration Scheme. Appropriate arrangements     
must be in place to ensure and evidence good governance in meeting
duties under the Public Bodies (Joint Working) (Scotland) Act 2014. 
(c) Financial implications
None directly associated with this report.  
Page 63

Page 64

(d) Risk Implications and Mitigation
There are systems and processes in place across service areas to
support clinical governance, providing assurance to the HSCM Senior
Leadership Team and to the Clinical and Care Governance Committee.
There are platforms within Health and Social Care to discuss and share
good practice, learning and challenges. 
Moray Integration Joint Board (MIJB), Moray Council and NHS Grampian
could find themselves exposed to significant risks if good governance is
not in place.  The purpose of this report is to oversee the processes to
ensure that appropriate action is taken in response to adverse events,
scrutiny reports/action plans, safety action notices, feedback, complaints
and litigation, and those examples of good practice and lessons learned
are disseminated widely.           
Adverse events and complaints provide significant information on trends
relating to risk and an encouraging opportunity for learning across the
system. Regular monitoring of this is critical to ensure continuous
improvement and the ambition of achieving excellence in our delivery of
high quality care and treatment. 
The local Clinical Risk Management (CRM) group reviews all events
logged on Datix, ensuring risk is identified and managed. 
(e) Staffing Implications         
This activity is core to all practitioners in the front line both in terms of   
their professional competence and assurances in care delivery.   
(f) Property        
None directly arising from this report. 
(g) Equalities/Socio Economic Impact 
There is no requirement for an equality impact assessment because                
there is no change to policy required as a result of this report. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions
None directly arising from this report. 
(j) Consultations
Consultations have been undertaken with the following staff who are in
agreement with the content of this report where it relates to their area of
responsibility: 
• HSCM Clinical and Care Governance Group members
• Sonya Duncan, Corporate Manager
• Tracey Sutherland, Committee Services Officer, Moray Council  
Page 64

Page 65

6. CONCLUSION 
6.1 The HSCM Clinical and Care Governance Group are assured that issues
and risks identified from complaints, clinical risk management, internal
and external reporting, are identified and escalated appropriately. The
group continues to develop lines of communication to support the
dissemination of information for action and sharing of good practice
throughout the whole clinical system in Moray. This report aims to
provide assurance to the Moray Integration Joint Board Clinical and Care
Governance Committee that there are effective systems in place to
reassure, challenge and share learning. 
Author of Report: Jacqui Shand, Interim Clinical Governance Co-ordinator,
HSCM Background Papers: with author 
Ref: 
Page 65

Page 66

Page 66

Page 67

REPORT TO: MORAY INTEGRATION JOINT BOARD CLINICAL AND CARE
GOVERNANCE COMMITTEE ON 23 FEBRUARY 2023 
SUBJECT: ADULT SUPPORT AND PROTECTION MULTI-AGENCY
IMPROVEMENT PLAN 
BY:   HEAD OF SERVICE/ CHIEF SOCIAL WORK OFFICER 
1. REASON FOR REPORT 
1.1. To update the Committee on progress against the Adult Support and Protection
Multi-agency Improvement Plan, since the last update provided in October
2022. 
2. RECOMMENDATION 
2.1. It is recommended that the Clinical and Care Governance Committee
considers and notes: 
i) the Multi-agency Improvement Plan and progress to date; 
ii) the systems in place to monitor and progress actions within the
plan; and 
iii) that a further update will be provided to the next Committee meeting 
3. BACKGROUND 
3.1 The joint inspection of the Moray partnership took place between March and
May 2022.  The Care Inspectorate asked the Moray partnership to develop an
improvement plan to address the priority areas for improvement identified.  The
Care Inspectorate will monitor progress implementing the plan. 
3.2. The Multi-agency Improvement Plan builds upon Moray’s original improvement
action plan formulated in 2019 following a series of engagement and
consultation events and multi-agency workshops with the purpose of giving a
clear foundation and oversight to Adult Support and Protection activities in
Moray. 
3.3. This plan is a multi-agency plan and is the tool used within the Moray Adult
Protection Committee to provide assurance to all partners of progression and
development in the work carried out.
Item 8.
Page 67

Page 68

4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1. Following the Joint Inspection period, work has continued to ensure that all
recommendations from the Joint Inspection are reflected within the Moray Multi-
agency Improvement Plan.  The improvement recommendations are as follows:
• The partnership should ensure the application and delivery of key
processes for all adults at risk of harm is consistent and in line with the
Moray Health and Social Care Partnership (HSCP) and Grampian
interagency procedures.
• The partnership should ensure that full adult support and protection
investigations are carried out for all adults at risk of harm who require them.
• The partnership should seek to improve the quality of chronologies, risk
assessments, and protection plans. This will impact positively on the
management of risk for adults at risk of harm.
• Case conferences and review case conferences should be clearly defined,
involve the adult at risk of harm and unpaid carer where appropriate and
should be convened for all adults at risk of harm who require them. The
partnership should prioritise the full implementation of the improvement
plan. Strategic leaders should ensure that the appropriate resources are
made available.
• Strategic leaders should strengthen governance of adult support and
protection practice. There should be robust measures in place to identify
concerns early and promptly implement remedial action.
• Strategic leaders should continue to develop multi-agency self-evaluation
activities. Frontline staff should be fully involved in the design,
implementation and consequent improvement work.
4.2. The Improvement Plan is attached at Appendix 1.  It has been divided into
sub-sections and priority areas for improvement have been highlighted.  The 7
sub sections are as follows: 
• Lived Experience (Priority 1)
• Quality Assurance and Audit (Priority 2)
• ICT and recording (Priority 3)
• Policy, process and procedures
• Training and Development 
• Service Design and Review 
• Professional Practice 
4.3. The Local Authority have invested in using Pentana audit management
software. The use of this software has allowed better oversight of the
improvement journey and records and tracks activities as they are progressed. 
4.4. The Moray partnership recognise the benefit of working together with all
partners and understands the task ahead in Moray for Adult Support and
Protection and working together will only strengthen the partnership and
delivery. 
4.5. The Improvement and Planning sub group of the Moray Adult Protection
Committee meets on a 4 weekly basis. This group is multi-agency and has
been formed to discuss protection and allocation of tasks and will have full
Page 68

Page 69

oversight of the improvement plan and ensures all stakeholders are involved
and consulted on progress and actions. This larger group will be involved in
agreeing progress thus far and ensuring the improvement plan is sufficiently
updated. The plan will then be presented to the Adult Protection Committee at
each meet.   
4.6. NHS Grampian (NHSG) will also be progressing further Adult Support and
Protection (ASP) improvements via a NHSG specific ASP Improvement Plan. 
This plan is coordinated and led by the NHSG Public Protection team, and
include some of the actions from the Moray multi-agency plan, but also
encompasses wider ‘Grampian wide’ initiatives – where a one for Grampian
approach is thought to be beneficial on grounds of resource use and
consistency. 
4.7. This NHSG ASP Improvement Plan is regularly reviewed by the NHSG Adult
Protection Group and overseen by the NHSG Public Protection Committee. 
There are direct lines of communication and updates between the NHSG Adult
Public Protection lead and the Moray ASP Consultant Practitioner – ensuring
that both the local Moray Multi-Agency Improvement Plan and the NHSG wide
plan remain synchronised.     
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Moray Partners in Care 2022-2032”
This report supports the Moray Strategic Plan in relation to
Partners in Care, making choices and taking control over
decisions affecting our care and supporting the outcome that
people are safe. 
(b) Policy and Legal
The Adult Support and Protection (Scotland) Act 2007 is the main legal
reference points for this project which the MIJB are legally responsible
for. 
(c) Financial implications
No financial implications as a direct result of this report. 
(d) Risk Implications and Mitigation
The improvement plan will implement robust systems and processes in
response to the Care Inspectorate’s findings, with a multi-agency
approach.  Regular monitoring and reviewing of new processes are
critical to ensure continuous improvement. 
(e) Staffing Implications
None as a direct result of this report. 
(f) Property
None as a direct result of this report. 
(g) Equalities/Socio Economic Impact
Not required as there are no changes to policy as a result of this report. 
Page 69

Page 70

(h) Climate Change and Biodiversity Impacts
None as a direct result of this report. 
(i) Directions
None as a direct result of this report. 
(j) Consultations
ASP Planning and Improvement Sub Group. 
6. CONCLUSION 
6.1. The report aims to provide assurance to this Committee that there is
effective processes in place to monitor and progress actions in the plan. 
Author of Report: Vicki Low, Moray ASP Consultant Practitioner – HSCM 
Background Papers:  with author
Ref: 
Page 70

Page 71

Appendix 1
1
Moray ASP Improvement Action Plan 2022-24 
Report Type: Actions Report
Generated on: 08 February 2023 
Background 
The Improvement Action Plan was first formulated in 2019 following a series of engagement and consultation events and multi-agency workshops with
the purpose of giving a clear foundation and oversight to Adult Support and Protection activities in Moray. The structure of the plan has changed over
time and has been further influenced by our most recent Joint Inspection in 2022 highlighting further areas for development. The Plan is multi-agency
and is the tool used within Adult Protection Committee to provide assurance to all partners of progression and development in the work that we do. 
Project Work streams and objectives 
The initial self-evaluation activities identified 6 main work streams, and this formed the foundation of our plan. Since the Joint Inspection, a 7th work
stream has been identified. Initial Quality Assurance was intertwined within the plan – this was an area of improvement for us – and as such required
its own section within the plan. We recognise the benefit of working together with all partners. We know we have a long way to do in Moray for Adult
Support and Protection and working together will only strengthen our partnership and delivery of Adult Support and Protection. 
Assurance – how do we know we are achieving?
To provide all partners with the assurance they need to monitor Adult Support and Protection activity it is important that we are honest and
transparent about our improvement activities and the deadlines we set. As well as the plan, we have invested in using Pentana audit management
software. The plan has been relayed onto the software system and assists us in measuring outcomes and tasks completed – assisting in giving better
oversight to work undertaken and clear work streams. This is new to Moray and an area we hope will provide better strategic oversight in Adult
Support and Protection and assist in better efficiency and communication to all partners. 
Design Principles
The plan is based on the following principles 
➢ We will engage with our colleagues who provide ASP support in developing and then implementing the Moray Improvement Action Plan 
➢ We will consult with our colleagues and partners in the development and then implementation of the Moray Improvement Action Plan; and
monitor and review implementation, practise and outcomes to provide assurance 
➢ We will be open and transparent with all stakeholders in terms of the improvement actions that require to be undertaken. 
Governance 
The following diagram illustrates the governance arrangements in relation to overseeing the project plan 
The Improvement and Planning subgroup will meet on a 6 weekly basis. Our project sponsor is the Chief Social Work Officer. 
The Improvement and Planning subgroup is multi-agency and representatives from Social Work, NHS, Police and Advocacy are the core members. At
each, meet the Adult Support and Protection Lead officer co-ordinates the meetings. It is the responsibility for all members of the group to provide
Item 8.
Page 71

Page 72

Appendix 1
2
updates prior to each meet of which will then be collated and documented onto the Plan. The updated Plan is then passed to the Chair of the Adult
Protection Committee to provide assurance of work undertaken and to discuss within Adult Protection Committee. 
It is further recognised that updates of the plans progress are also provided to Practice and Clinical Care Governance as update. 
Page 72

Page 73

Appendix 1
3
Priority improvement areas as identified by Care Inspectorate: - 
1. The partnership should ensure the application and delivery of key processes for all adults at risk of harm is consistent and in line with the Moray Health and Social Care Partnership
(HSCP) and Grampian interagency procedures.
2. The partnership should ensure that full adult support and protection investigations are carried out for all adults at risk of harm who require them.
3. The partnership should seek to improve the quality of chronologies, risk assessments, and protection plans. This will impact positively on the management of risk for adults at risk of
harm.
4. Case conferences and review case conferences should be clearly defined, involve the adult at risk of harm and unpaid carer where appropriate and should be convened for all adults at
risk of harm who require them. The partnership should prioritise the full implementation of the improvement plan. Strategic leaders should ensure that the appropriate resources are made
available.
5. Strategic leaders should strengthen governance of adult support and protection practice. There should be robust measures in place to identify concerns early and promptly implement
remedial action.
Strategic leaders should continue to develop multi-agency self-evaluation activities. Frontline staff should be fully involved in the design, implementation and consequent improvement work 
Action Status 
Cancelled 
Overdue; Neglected 
Unassigned; Check Progress 
Not Started; In Progress; Assigned 
Completed 
1. Lived Experience (PRIORITY) 
Code Action Title Agency Due Date Latest Status Update Status
Progress
Status
Icon Assigned To
ASP SIP
Cat1.1
Review commissioned advocacy service to
ensure formal advocacy services are as
accessible as possible for people involved in
ASP process
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 4, 5,
6  
31-Mar-
2023
Decision has been taken to undertake a 1-year
award for Advocacy in Moray. Commissioning are
finalising this.  20% 
Page 73

Page 74

Appendix 1
4
ASP SIP
Cat1.2
Listen to People - Agree and implement a
systematic approach to capturing the lived
experience (qualitative) of people who have
been in contact with the ASP process
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 4, 6  31-Mar-
2023
Conversation Cafe; booked for 04-02-2023. This
will be an opportunity for individuals who have
been open to ASP process to talk about their
experiences and to talk about improvements to
the case conference process. Verbal update to be
provided by Advocacy at Feb APC. Subgroup
continues to meet and explore ways of engaging
with individuals who have been part of ASP
process. 
75% 
2. Quality Assurance and Audit (PRIORITY) 
Code Action Title Agency Due Date Latest Status Update Status
Progress
Status
Icon Assigned To
ASP SIP
Cat2.1
Design of ASP audit to undertake case file QA
for x1 adult. This will encompass from point
of referral to IASPCC findings shared with
PGB and reported to APC with aim to inform
practice improvement and highlight elements
of good practice.
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 1, 2,
3, 4, 5, 6
28-Feb-
2023
Unable to progress in January due to lack of
capacity – to update for next APC 
50% 
Vicki Low; Sammy
Robertson
ASP SIP
Cat2.2
Involvement of Team Managers in
undertaking Investigation documentation
quality assurance exercise on a monthly basis
- to evaluate practice feedback and further
learning shared
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 2, 3,
4, 5, 6  
30-Nov-
2022
Meetings have taken place, however, these have
not been attended well by Team Managers and
this has resulted in a lack of progress in this area
– to be highlighted on Risk Register. 
0% 
Vicki Low; Sammy
Robertson
ASP SIP
Cat2.3
Involvement of Advanced Practitioners across
Adult Social Work in adult support and
protection quality assurance activities for
monthly single agency screening tool audits
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 3, 4,
6  
31-Oct-
2022
Continues to be in place 
100% 
Vicki Low; Sammy
Robertson
ASP SIP
Cat2.4
Multi-Agency IRD Summary Quality
Assurance Audit to take place - review all
IRDs from commencement
MULTI
AGENCYCARE
INSPECTORATE
PRIORITY: 1, 2,
3, 4, 5, 6  
31-Jul-
2022
Next IRD audit to take place Summer 2023 
Case Conference Audit activity to take place on a
multi-agency basis – date to be arranged 
100% 
3. ICT and Recording (PRIORITY) 
Code Action Title Agency Due Date Latest Status Update Status
Progress
Status
Icon Assigned To
Page 74

Page 75

Appendix 1
5
ASP SIP
Cat3.1
All adult support and protection files to be
transferred to Every Client Documents within
T drive
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 1,4   
31-Mar-
2023
No update from ICT 
10% 
Samantha  Morgan
ASP SIP
Cat3.2
Naming convention in place for all Adult
Support and Protection electronic files
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 1, 4  
31-Mar-
2023
Unable to progress due to lack of capacity 
50% 
ASP SIP
Cat3.3
Use of Pentana to measure progress of multi-
agency improvement plan
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 5   
31-Jan-
2023
Pentana to be opened up to multi-agency
colleagues Feb 2023 
100% 
Vicki Low; Sammy
Robertson
ASP SIP
Cat3.4
Information and Intelligence Subgroup to
analyse data set and to improve standard of
reporting to COG, APC and risk and
performance management group
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 5  
31-Dec-
2022
Quarterly report with increased data information
to be presented to APC Feb 2023 – moving
forward Quarterly reports to reflect new national
data set   
100% 
Vicki Low; Sammy
Robertson
ASP SIP
Cat3.5
Procedure in place for use of events/activities
in relation to Adult Support and Protection
activity on CF
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 1, 2,
3, 4, 5,   
31-Dec-
2022
Audit required of CF system on a monthly basis –
to take place March 2023. 
100% 
Vicki Low; Sammy
Robertson
ASP SIP
Cat3.6
Discussion to take place regarding proposal
for possible Data set from Police Scotland
which would be added to the existing local
date set to APC
AGENCY: Police
CARE
INSPECTORATE
PRIORITY: 5  
31-Mar-
2023
Police can share information regarding ASP
referrals and Concerns – to further discuss 
Assigned to: Vicki Low, Bruce Buntain
0% 
4. Policy, Process and Procedures 
Code Action Title Agency Due Date Latest Status Update Status
Progress
Status
Icon Assigned To
ASP SIP
Cat4.1
TM oversight and involvement of chairing of
all RASPCC, in line with the Op Guidance, to
support clearly defined ASPCC and RASPCC
process - This will include regular updates
and review to ensure collaboration to be
discussed within the ASP Op meet
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 1, 2, 3,
4, 5  
30-Nov-
2022
Update Feb 2023 – lack of attendance at TM
meetings – to discuss review meetings. This has
been further impacted by lack of admin capacity
– to be included in Risk Register  0% 
Tracy Stephen
Page 75

Page 76

Appendix 1
6
ASP SIP
Cat4.2
Core Group of front line practitioners formed
to review Investigation documentation on CF
- specific attention to the management of risk 
and protection planning within recordings
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 1, 3, 6   
30-Nov-
2022
Update Feb 2023 – practitioners met to discuss
January 2023 – work on going and review
activities will be set moving forward  100% 
Sammy Robertson
ASP SIP
Cat4.3
Core Group of front line practitioners formed
to review Screening Tool documentation on
CareFirst - specific attention to the
management of risk, protection planning and
application of the 3-point test
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 1, 3, 6    
30-Nov-
2022
Update Feb 2023 – core group of practitioners
met January 2023 – in progress – review
activities will be set moving forward  100% 
Sammy Robertson
ASP SIP
Cat4.4
Core Group of front line practitioners formed
to devise, design and implement Large Scale
Investigation recording and investigation
documentation on Carefirst. Attention
required in relation to risk management and
protection planning
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 1, 3, 6     
30-Nov-
2022
Subgroups to commence August 2022. Due to
LSI activity this activity has been completed by
LSI lead Officers and will be reviewed alongside
x8 council officers following current LSI to inform
any changes to document 
Feedback meeting with practitioners took place
and further small changes agreed as well as
practitioner guidance produced and to use
document moving forward with further review
following each LSI activity undertaken 
Assigned to: Vicki Low
100% 
Vicki Low; Sammy
Robertson
ASP SIP
Cat4.5
Full Review of the Decision Specific Capacity
Tool to be undertaken on a multi-agency
basis – with input from NHSG and Lead
Agency council employed staff.
AGENCY: NHS
Grampian CARE
INSPECTORATE
PRIORITY: 1, 2, 5,
6,  
31-Jan-
2023
30-01-2023: Tool revised updated and
completed. Distributed out to all agencies along
with a briefing note to support roll out. To be
discussed in Council Officer meetings + main
Grampian Psychiatrist clinical meetings. 
Assigned to: Kenny O ‘Brien
100% 
ASP SIP
Cat4.6
Initiate ASP Champions Role within NHSG -
ensure that staff have local contacts and links
for advice and support - alongside more
formal structures
AGENCY: NHS
Grampian
CARE
INSPECTORATE
PRIORITY: 1, 5, 6   
28-Feb-
2023
30-01-2023: Delayed due to NHS clinical
pressures. However, nominations from
teams/areas expected in February. Plans already
in place to train Champions + offer additional
support. Now aiming for end of February 2023
launch. 
Assigned to: Kenny O ‘Brien 
75% 
ASP SIP
Cat4.7
iVPD local process review to take place in
order to identify opportunities for
AGENCY: Police
CARE
31-Dec-
2022
Activity well underway with multi-agency sub
group formed and active discussion and planning 50% 
Page 76

Page 77

Appendix 1
7
improvements in quality of information
shared, and expectations of agencies
receiving Adult Concern Reports from Police
INSPECTORATE
PRIORITY: 1, 3, 5  
taking place   
Assigned to: Sheila McDermott
ASP SIP
Cat4.8
Ensure local and Grampian processes align
and embed. This will be monitored via QA
activities and regular briefing sessions. Work
to be undertaken on a Grampian-wide basis
to align the Grampian Procedures with the
revised COPs and Local Guidance.
Agency: Multi-
Agency
CARE
INSPECTORATE
PRIORITY: 1, 2, 3,
4, 5, 6
31-Jan-
2023
Subgroup currently updating Grampian
procedures to reflect revised codes of practice.
QA activities on going - to continue to develop
good communications and continually review
effectiveness  - end date to be extended to
March 2023, likely to go through governance
groups April/May 2023
80% 
5. Training and Development 
Code Action Title Agency Due Date Latest Status Update Status
Progress
Status
Icon Assigned To
ASP SIP
Cat5.1
Clear training calendar available for external
partners to book via Eventbrite
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 1, 3 
31-Dec-
2022
Update Feb 2023 – training facilitator current on
sick leave  50% 
ASP SIP
Cat5.2
Collaboration with Social Work training to
facilitate complex risk assessment across
adult social work
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 1, 2, 3 
31-Dec-
2022
Update November 2022 – Complex risk
assessment for single agency devised and
cascaded and presented across adult social work. 
Continue to discuss pan Grampian for multi-
professionals – to change to multi-agency action
for pan Grampian approach as of November
2022. Leads – Vicki Low 
Assigned to: Vicki Low, Social Work Training
100% 
ASP SIP
Cat5.3
Adult Support and Protection Training Plan to
be available to all practitioners throughout
Adult Social Work, Social Care and 3rd sector
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 1, 2, 3,
4  31-Aug-
2022
Training Plan disseminated to all 3rd sector -
March 2022.
Training Plan available on Moray Protects
webpage - April 2022.
Training Plan available to all Social Work Teams -
April 2022.
Training Plan available to all housing and children
services - July 2022.   
Assigned to: Vicki Low
100% 
Vicki Low; Sammy
Robertson
ASP SIP
Cat5.4
Collaboration to take place with Child
Protection to design and deliver Chronology
training across Children and Adult Social
AGENCY: Local
Authority CARE
INSPECTORATE
31-Dec-
2023
Update Feb 2023 – National Chronology
Implementation Group meeting (2 meets so far)
Terms of Reference in place for the Groups.
40% 
Vicki Low; Sammy
Robertson
Page 77

Page 78

Appendix 1
8
Work PRIORITY: 1, 3,   Attached for Feb 2023 discussion. 
Local Chronology Implementation Group to meet
in due course to look at local approach Children
and Adult Services. 
ASP SIP
Cat5.5
Clear and up to date records of all Adult
Support and Protection training undertaken -
Module, 1, 2, 3 and 4 - including when
Council Officer refresher training is required
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 1, 5, 6  
31-Aug-
2024
Update- Feb 2023 – no update Training facilitator
on sick leave  10% 
ASP SIP
Cat5.6
Council Officer Handbook detailing tasks in
relation to Adult Support and Protection
duties and role
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 1, 2, 3,
4 
31-Jul-
2023
February 2023 – delayed to amend end date –
this is due to delivery of Grampian wide training
in risk assessments and chronologies – guide to
reflect these changes. 
50% 
Vicki Low; Sammy
Robertson
ASP SIP
Cat5.7
Develop Practitioner Guidance on Self-neglect
and Hoarding
AGENCY: Local
Authority
CARE
INSPECTORATE
PRIORITY: 1, 2, 3,
4,   
30-Nov-
2022
Delayed due to Training Facilitator sick leave 
75% 
ASP SIP
Cat5.10
New training framework for ASP to be
embedded with all patient facing staff
receiving a facilitated level 2 ASP training
course
AGENCY: NHS
Grampian CARE
INSPECTORATE
PRIORITY: 1, 2, 3,
4, 5    
31-Aug-
2024
Training framework signed off and in place.  ASP
Level 2 now mandatory for NHSG patient facing
staff with a 3-year repeat built in.  Courses being
run. 
Assigned to: Kenny O'Brien
100% 
ASP SIP
Cat5.11
For NHSG staff recording of ASP input and
activity - revise ASP Level 2 Training to
include specific section on Health records and
ASP, good practice examples to be included.
AGENCY: NHS
Grampian CARE
INSPECTORATE
PRIORITY: 1, 2, 3,
4, 5,    
31-Mar-
2023
Training curriculum now revised and being
delivered. Practice note completed and signed
off/endorsed by the Clinical Professional Directors
Forum for additional weight.  Note distributed to
all staff. 
Assigned to: Kenny O'Brien
100% 
ASP SIP
Cat5.12
Financial Harm subgroup lead by Police
Scotland (John Webster)
AGENCY: Police
CARE
INSPECTORATE
PRIORITY: 1, 5, 6,   
31-Aug-
2024
Subgroup refreshed, new Terms of Reference
compiled and Financial Harm Group firmly
established. They are accountable to the
Grampian ASP Working Group. 
Assigned to: John Webster
100% 
ASP SIP
Cat5.13
Mandatory online training for ASP rolled out
and to be undertaken by all officers.
Agency: Police
CARE
INSPECTORATE
30-Nov-
2022
Compliance rate requested - this can then be
reviewed on a regular basis.  90% 
Page 78

Page 79

Appendix 1
9
PRIORITY: 1, 2, 3,
4, 5, 6 
Assigned to: Bruce Buntain
ASP SIP
Cat5.14
Training and briefings to existing and new
members (on induction) in relation to their
roles and responsibilities on the ASP
committee
MULTI AGENCY
CARE
INSPECTORATE
PRIORITY 5, 6,   
31-Aug-
2024
Training and updates delivered as required 
Assigned to: Samara Shah   100% 
ASP SIP
Cat5.15
Implement learning points from Multi-Agency
IRD Audit
MULTI AGENCY
CARE
INSPECTORATE
PRIORITY: 5, 6,    
31-Oct-
2022
IRD Report written and presented to APC Sep
2022. Presented to Council Officer Forum and
Practice Governance. Further reflection and
implementation of learning point to be taken
forward at next council officer session – as well
as specific discussion with IRD chairs – scheduled
throughout Sept and Oct 
Assigned to: Vicki Low and Elaine MacDonald
for Social Work
100% 
6. Service Redesign and Review 
Code Action Title Agency Due Date Latest Status Update Status
Progress
Status
Icon Assigned To
ASP SIP
Cat6.1
Adult Social Work consultation -  design and
implementation of a service wide
development and improvement plan to reflect
on ASP inspection, SDS standards and
national and local policy
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 5, 6,   31-Oct-
2022
Initial discussions have taken place with Team
Managers with regard to importance of
improvement and development for Social Work.
Consultation Workshops planned for end Sep
2022.   
Assigned to: Vicki Low
100% 
Jane Mackie; Tracy
Stephen
ASP SIP
Cat6.2
To develop a multi-agency approach and
training for 2nd persons in Adult support and
protection
MULTI AGENCY
CARE
INSPECTORATE
PRIORITY: 1,2, 3,
4, 5 
31-Dec-
2023
Progress – local 2nd Person training being
undertaken in Moray – however, not Multi-
agency to have further discussion regarding
multi-agency contribution within Grampian
Learning and Development Group 
0% 
ASP SIP
Cat6.3
ASP Live Event MULTI AGENCY
CARE
INSPECTORATE
PRIORITY: 5, 6  31-Jul-
2023
Postponed to 2023 – amendment to end date
due to operational Priorities. Theme – Grampian
Procedures. 
Assigned to: Vicki Low, John Lumsden. Kenny
O'Brien, Anne Pendery
10% 
Page 79

Page 80

Appendix 1
10
ASP SIP
Cat6.4
Discussion to take place within COG and APC
regarding capacity and gaps in service to
ensure clear oversight of matters by our
more senior leaders
MULTI AGENCY
CARE
INSPECTORATE
PRIORITY: 5. 6 
31-Oct-
2022
Discussions taking place at both COG and APC
regarding gaps and capacity issues. This is also
reflected within our APC Risk Register and is a
standing item agenda  
100% 
7. Professional Practice 
Code Action Title Agency Due Date Latest Status Update Status
Progress
Status
Icon Assigned To
ASP SIP
Cat7.1
Regular Council Officer Forums – to include
regular feedback sessions
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 1, 2, 3,
4, 5, 6 
30-Nov-
2022
Council Officer Forums in place. Formally
recorded and training materials to be available
within SharePoint for CO viewing - TO be
reviewed Nov-22 by consultation with CO's 
Council Officer Forum due in December 
Assigned to: Elaine MacDonald, Suzy Gentle
100% 
ASP SIP
Cat7.2
Regular Team Manager 'catch up' meetings to
take place to discuss adult support and
protection practice within teams
AGENCY: Local
Authority CARE
INSPECTORATE
PRIORITY: 5, 6 
30-Nov-
2022
Update- due to lack of capacity – it has been
difficult to progress this, however, locally we do
have our Operational Group in which sharing of
good practice does take place. 
50% 
Vicki Low; Sammy
Robertson
ASP SIP
Cat7.4
Review across all patient facing areas that
professional supervision is offered/available
AGENCY: NHS
Grampian CARE
INSPECTORATE
PRIORITY 5, 6,   30-Sep-
2022
Scoping complete + managers/staff now have
ASP as a regular item on 1:1's and supervision
discussions. Also a regular item now on team
meeting agendas. NHSG Public Protection
Supervision arrangements now finalised,
consulted on, and approved. The professional
supervision document is now live.   
Assigned to: NHSG ASP
100% 
Page 80

Page 81

REPORT TO: MORAY INTEGRATION JOINT BOARD CLINICAL AND CARE
GOVERNANCE COMMITTEE ON 23 FEBRUARY 2023 
SUBJECT: HEALTH AND SOCIAL CARE MORAY CLINICAL AND CARE
GOVERNANCE UPDATE 
BY:  CHIEF NURSE - MORAY 
1. REASON FOR REPORT 
1.1. To inform the Clinical and Care Governance Committee of the outcome of the
first Clinical and Care Governance workshop to refresh the structure of Clinical
and Care Governance within Health and Social Care Moray.   
2. RECOMMENDATION 
2.1. It is recommended that the Committee considers and notes: 
i) the content of this report and the associated outcomes and
recommendations therein; and 
ii) that an update will be provided at the next meeting. 
3. BACKGROUND 
3.1. In response to the guidance of the Scottish Government Clinical and Care
Governance Framework for Integrated Health and Social Care Services in
Scotland a review has been ongoing relating to the Health and Social Care
Moray clinical and care governance structures against this framework. A
previous workshop was held in January 2020.   
3.2. Committee members were informed in February 2022 of a proposed follow up
planned for April / May 2022.  This did not occur on the proposed timescale due
to staff changes throughout the clinical and care governance team. A report to
Committee on 27 October 2022 provided an overview of the developments in
relation to clinical and care governance to date and set out the intention to hold
the first in a series of workshops in January 2023. 
3.3. The workshops have been planned and designed specifically to accelerate this
task and ensure that robust clinical governance structures within the
Partnership are implemented over the coming months of 2023. 
Item 9.
Page 81

Page 82

4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1. The key outcomes of the Workshop 1 held on 19 January 2023 are presented
for consideration:   
4.2. There were a relatively low number of attendees, however those in attendance
made significant headway and returned overall positive feedback and as a
result, attendance numbers are expected to build throughout the workshop
series. 
4.3. There was overall agreement that closer working between departments,
increased transparency and more shared working practices and systems were
a key objective as we move forward. 
4.4. Current blocks to effective working were discussed and challenges explored
with resolutions being created within the workshop.   
4.5. Senior Leadership worked through current processes outlining areas where
more robust processes, communication systems and staff support were
required and beginning the process of outlining what this will look like.   
4.6. Staff ended the workshop feeling enabled and inspired with the belief that the
proposed improvements would make significant positive changes to their areas
of responsibility. 
4.7. The next workshop aims to re-draft the communication on Clinical and Care
Governance with a view to integrating disciplines more closely and to
communicate risk and improvements more rapidly and effectively.  This piece of
work is scheduled to be completed by end of February 2023 and the outcomes
will be communicated to the Committee at the next scheduled meeting. 
4.8. Updates to governance for services and systems which must be incorporated –
namely Children & Families, Justice social work, were discussed with the next
workshop being planned in February 2023 in order to work specifically on the
integration.   
4.9. The impact of the National Care Services Bill and the required changes will
need to be incorporated under the auspices of this Bill. This is at the forefront of
consideration as we proceed forward through the workshop series. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022-2032”
Governance arrangements are integral for the assurance of the delivery of
safe and effective services that underpins the implementation of the strategic
plan.  
Page 82

Page 83

(b) Policy and Legal
Compliance with Scottish Government National Framework for Clinical and
Care governance outlining the statutory duties under The Public Bodies (Joint
Working) (Integration Joint Boards) (Scotland) Order 2014 
(c) Financial implications
There are no financial implications arising as a direct result of this report. 
(d) Risk Implications and Mitigation
The links between stakeholders and clarify the governance framework will
further strengthen provision of assurance and reduce the likelihood of
negative impacts to the system. 
(e) Staffing Implications
There are no staff implications arising as a direct result of this report. 
(f) Property
There are no property implications arising as a direct result of this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as there are no changes to
policy as a result of this report. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined for this
report. 
(i) Directions
There are no directions required as a result of this report. 
(j) Consultations
Consultations have taken place with Head of Clinical Governance and
members of the Clinical and Care Governance Group and their comments
have been incorporated in the content of this report. 
6. CONCLUSION 
6.1 The committee are asked to acknowledge the challenges imposed on the
refreshing and updating of the clinical and care governance framework
created by the Covid pandemic, including the redeployment of key
personnel to frontline services. As noted a number of key stakeholders
have changed posts and further engagement is required by new staff to
move the agenda forward. This work will be incorporated into further
workshops. 
6.2 The first workshop has been undertaken within the defined time frame.
The feedback has been positive, citing an increased positive outlook and
sense of empowerment of those involved. 
Page 83

Page 84

Author of Report: Jacqui Shand, Interim Clinical Governance Coordinator
(HSCM)
Background Papers:  
Ref: 
Page 84