Audit, Performance and Risk Committee 
Thursday, 31 August 2023 
Council Chambers 
NOTICE IS HEREBY GIVEN that a Meeting of the Audit, Performance and Risk
Committee, Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Thursday, 31 August 2023 at 14:00 to consider the business noted below. 
AGENDA 
1. Welcome and Apologies 
2. Declaration of Member's Interests 
3. Minute of Special Meeting on 29 June 2023 5 - 6
4. Minute of meeting of 29 June 2023 7 - 10
5. Action Log of Meeting of 29 June 2023 11 - 12
6. Quarter 1 Performance Report 13 - 40
7. Internal Audit Section Update 41 - 48
8. Strategic Risk Register 49 - 78
9. Update on Improvement Plan for Adult Social Care
Commissioning
79 - 82
10. Internal Audit Section Completed Projects 83 - 90
11. Self-Directed Support Option 1 Audit Update 91 - 96
12. Self-Directed Support Option 2 and 3 Audit Update 97 - 102
13. Client Monies Audit Update 103 - 106
Page 1

Page 2

Page 2

Page 3

MORAY INTEGRATION JOINT BOARD 
SEDERUNT 
Councillor Scott Lawrence  (Chair)  
Mr Derick Murray  (Voting Member)
Mr Sandy Riddell  (Voting Member)
Councillor John Divers  (Voting Member)
Mr Sean Coady  (Member)
Mr Graham Hilditch  (Member)
Mr Simon Bokor-Ingram  (Member)
Ms Sonya Duncan  (Member)
Ms Deborah O'Shea  (Member)  
Mr Stuart Falconer  (Non-Voting Member) 
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 3

Page 4

Page 4

Page 5

MINUTE OF MEETING OF THE AUDIT, PERFORMANCE AND RISK COMMITTEE 
Thursday, 29 June 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Mr Simon Bokor-Ingram, Councillor John Divers, Ms Sonya Duncan, Councillor Scott
Lawrence, Mr Derick Murray, Ms Deborah O'Shea, Mr Sandy Riddell 
APOLOGIES 
Mr Sean Coady, Mr Stuart Falconer, Mr Graham Hilditch 
IN ATTENDANCE 
Also in attendance at the above meeting were the Chief Internal Auditor, Angela
Pieri, External Auditor (Grant Thornton) and Democratic Services Manager.   
1.         Declaration of Member's Interests 
The Committee noted that there were no declarations of member's interests. 
2.         Unaudited Annual Accounts 
A report by the Interim Chief Financial Officer informed the Committee of the
Unaudited Annual Accounts of the Moray Integration Joint Board (MIJB) for the year
ended 31 March 2023.  
Following consideration the Committee agreed to note:  
i) the unaudited Annual Accounts prior to their submission to the external auditor,
noting that all figures remain subject to audit;    
ii) the Annual Governance Statement contained within the unaudited Annual
Accounts; and    
iii) the accounting policies applied in the production of the unaudited Annual
Accounts, pages 46 to 47 of the accounts.   
Item 3.
Page 5

Page 6

3.         Local Code of Corporate Governance - Update 
A report by the Interim Chief Financial Officer provided the Committee with an
opportunity to comment on the updated sources of assurance for informing the
governance principles as set out in the Chartered Institute of Public Finance (CIPFA)
/Society of Local Authority Chief Executives (SOLACE) ‘Delivering Good Governance
in Local Government Framework document. Also for information the self assessment
of good practice as set.  
Mr Murray highlighted that the Audit Performance and Risk Committee had not been
included in the table at Principle F of Appendix 1.  The interim Chief Financial Officer,
apologised for the omission and confirmed that she would ensure Appendix 1 was
updated to include Audit, Performance and Risk Committee.  
Following consideration the Committee agreed to:  
i) note the content of the report;    
ii) note the sources of assurance utilised in reviewing and assessing the
effectiveness of the MIJBs governance arrangements; 
iii) approve the updated Local Code of Corporate Governance which supports the
Annual Governance Statement in Appendix 1; and    
iv) approve the self assessment of good practice, in Appendix 2.   
Page 6

Page 7

MINUTE OF MEETING OF THE AUDIT, PERFORMANCE AND RISK COMMITTEE 
Thursday, 29 June 2023 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Mr Simon Bokor-Ingram, Councillor John Divers, Ms Sonya Duncan, Councillor Scott
Lawrence, Mr Derick Murray, Ms Deborah O'Shea, Mr Sandy Riddell 
APOLOGIES 
Mr Sean Coady, Mr Stuart Falconer, Mr Graham Hilditch 
IN ATTENDANCE 
Also in attendance at the above meeting were the Chief Internal Auditor, Interim
Planning and Strategy Lead, Mr John Campbell, Service Manager and Democratic
Services Manager.   
1.         Declaration of Member's Interests 
The Committee noted that there were no declarations of Member's interests.  
2.         Minute of the meeting of 30 March 2023 
The minute of the meeting of 30 March 2023 was submitted and approved.  
3.         Action Log of Meeting of 30 March 2023 
The action log of the meeting of 30 March 2023 was discussed and updated
accordingly.  
4.         Quarter 4 Performance 
A report by the Interim Strategy and Planning Lead updated the Audit, Performance
and Risk Committee on performance as at Quarter 4 (January to March 2023).
Item 4.
Page 7

Page 8

Mr Riddell expressed concern about the staff sickness levels and asked for more detail
on what is being done in regards to staff wellbeing.  
Following consideration, the Committee agreed to note:  
i)  the performance of local indicators for Quarter 4 (January to March 2023) as
presented in the Performance Report at APPENDIX 1; and     
ii)  the analysis of the local indicators that have been highlighted and actions
being undertaken to address performance that is outside of acceptable target
ranges as detailed in APPENDIX 1.    
5.         Internal Audit Section - Update 
A report by the Chief Internal Auditor asked the Committee to consider the contents
of this report; seek clarification on any points noted and otherwise note the report.    
Following consideration the Board agreed to note the audit update.  
6.         Internal Audit Section Completed Projects 
A report by the Chief Internal Auditor provided an update on audit work completed
since the last meeting of the Committee. 
Following consideration the Committee agreed to note the audit update.  
7.         Strategic Risk Register 
A report by the Chief Officer provided an overview of the current strategic risks, along
with a summary of actions which are in place to mitigate those risks, updated June
2023.  
Following consideration the Committee agreed to note the Strategic Risk Register
included at Appendix 1. 
8.         Internal Audit Annual Report 2022-23 
A report by the Chief Internal Auditor provided the Audit, Performance and Risk
Committee with details of internal audit work undertaken relative to the Moray
Integration Joint Board (MIJB) for the financial year ended 31 March 2023, and the
assurances available on which to base the internal audit opinion on the adequacy of
the MIJB’s systems of internal control.  
Following the audit carried out during 2022/23 the Chief Internal Auditor is only able
to provided limited assurance that the MIJB has adequate systems of governance
and internal control.  He further raised concern about the progress of the
implementation of the recommendations provided.  
Mr Riddell echoed the Chief Internal Auditor's concerns and highlighted the issue of
following through on issues.  As a Board assurances need to be given that actions
are being carried out but he felt at the moment for some issues, this is not being
received.  He further added that the issues should be escalated to the Board to
highlight the issues to them.
Page 8

Page 9

In response, the Chief Officer agreed that the issues should be escalated.  
Mr Murray suggested that there should be a report back to the Committee on what
was found and what has been done to address the issues. 
Following further consideration the Committee agreed: 
i)  to note the contents of the annual report at Appendix 1;    
ii) a further report to come back to the Committee to identify the issues and what
has been done to address them; and    
iii) escalate the issues to the Moray Integration Joint Board.   
9.         Resilience in Care at Home May 2023 
A report by the Provider Services Manager updated the Audit, Performance and Risk
Committee on work being done in Care at Home to address the Unmet Need in
Moray.  
Following consideration the Committee agreed to note:  
i) the actions being taken in Care at Home to address the unmet needs in Moray;
and    
ii) the increasing demand on the Care at Home Service.    
10.         Directions Update 
A report by the Interim Chief Financial Officer informed the Board of the issues
Directions of the Moray Integration Joint Board (MIJB) for the period 1 October to 31
March 2023.  
11.         Improvement Plan for Adult Social Care Commissioning 
A report by the Head of Service/Chief Social Work Officer informed the Committee of
progress regarding the improvement plan for Adult Social Care Commissioning in line
with the external review conducted by KPMG, finalised in February 2023.  
Following consideration the Committee agreed to:  
i) note the improvement plan attached at Appendix 1; and    
ii) approve the contents of the plan.   
Page 9

Page 10

Page 10

Page 11

MEETING OF MORAY INTEGRATION JOINT BOARD 
AUDIT, PERFORMANCE AND RISK COMMITTEE 
THURSDAY 29 JUNE 2023 
ACTION LOG 
Item
No.
Title of Report Action Required Due Date Action By Update for 
31 August 2023
1.  Quarter 4
Performance
More information required on what is being
done in regards to staff wellbeing to try and
reduce sickness levels
August 2023 Carmen
Gillies
On agenda
2.  Internal Audit
Annual Report
2022-23
Report back to the Committee on the issues
found in the audit reports and what has been
done to address them.
August 2023 Tracy
Stephen
On agenda
3.  Internal Audit
Annual Report
2022-23
Escalate the issues highlighted to the MIJB   
Item 5.
Page 11

Page 12

Page 12

Page 13

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 31 AUGUST 2023 
SUBJECT: QUARTER 1 (APRIL TO JUNE 2023) PERFORMANCE REPORT 
BY:  INTERIM STRATEGY AND PLANNING LEAD 
1. REASON FOR REPORT 
1.1 To update the Audit, Performance and Risk (APR) Committee on performance
as at Quarter 1 (April to June 2023). 
2. RECOMMENDATION 
2.1 It is recommended that the APR Committee consider and note: 
i) the performance of local indicators for Quarter 1 (April to June
2023) as presented in the Performance Report at APPENDIX 1; and 
ii) the analysis of the local indicators that have been highlighted and
actions being undertaken to address performance that is outside
of acceptable target ranges as detailed in APPENDIX 1; 
3. BACKGROUND 
3.1   The purpose of this report is to ensure the Moray Integration Joint Board
(MIJB) fulfils its ongoing responsibility to ensure effective monitoring and
reporting on the delivery of services and on the programme of work as set out
in its Strategic Plan. 
3.2   APPENDIX 1 identifies local indicators for the MIJB and the functions
delegated by NHS Grampian and Moray Council, to allow wider scrutiny by
the Board. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 Local Indicators are assessed on their performance via a common
performance monitoring Red, Amber, and Green (RAG) traffic light rating
system. 
RAG scoring based on the following criteria:
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within agreed
tolerance.
RED If Moray is performing worse than target by more than agreed
tolerance. 
4.2 Detailed charts and indicator data is attached in APPENDIX 1.  
Item 6.
Page 13

Page 14

Summary
4.3 Performance within Health and Social Care Moray (HSCM) as demonstrated
by the agreed indicators up to the end of quarter 1 of the financial year
2023/24 is showing as mostly in the red. Only one of the indicators is
presenting as green, one is amber and nine are red. 
4.4 Figure 1 provides a summary and the historical trends. A summary of
performance for each of the 6 reporting categories is provided below. Five of
these areas are presenting as red, while one is green. 
EMERGENCY DEPARTMENT - RED
There was an increase in the A&E attendance rate per 1,000 this quarter from
20.6 to 23.6, below the number presenting at the same period last year. 
DELAYED DISCHARGES – RED
The number of delays at the June snapshot increased to 30, from a low of 16
in May and 26 in the previous quarter. There is a lot of variation weekly (and
even daily) operationally and the figure of 30 for this measure is high for this
period. 
Bed days lost due to delayed discharges reduced from 751 last quarter to 732
this quarter. This is a reduction despite the increase in the more volatile
snapshot days (DD-01) measure and demonstrates that the trend is showing
a decrease overall in length of time delayed. 
EMERGENCY ADMISSIONS – RED  
For the first quarter since March 2021 there was not an increase in the rate of
emergency occupied bed days for over 65s. Since the end of quarter 4
2022/23 the rate has decreased from 2,749 to 2,699, however this still
exceeds the target of 2,320 per 1,000 population. 
The emergency admission rate per 1000 population for over 65s has
increased this quarter from 185.8 to 186.8 above the target of 177. 
Similarly, the number of people over 65 admitted to hospital in an emergency
also increased from 129.2 to 129.8 over the same period. Both of these
indicators are now RED. 
HOSPITAL RE-ADMISSIONS - AMBER
The 28-day re-admissions remain on target at 8.1%, as does the 7-day re-
admissions which have increased slightly to 4.0%. 
MENTAL HEALTH – RED  
After achieving 79% in quarter 3 2022/23 there has been a reduction in
performance for the second quarter in row with now 63% of patients being
referred within 18 weeks at the end of quarter 1 2023/24. 
STAFF MANAGEMENT – RED   
Sickness absence for NHS employed staff reduced to 4.7% during quarter 1
2023/24. Council employed staff sickness has reduced this quarter from a
Page 14

Page 15

high of 9.7% to 7.0 %, which is lower than the figure for the same period last
year.   
Figure 1 – Performance Summary 
* SM-01 - Data to May 23 
Note: In order to match other national and local data sources indicators are showing the last month in the reporting quarter. 
Page 15

Page 16

AREAS NOT MEETING TARGETS  
Delayed Discharge
4.5 The number of delays at the June snapshot was up to 30, up from a low of 16
in May and 26 in the previous quarter.  There is a lot of variation operationally
and the figure of 30 for this measure is on high side for this period with daily
figures generally falling in the low 20s. 
4.6 The average number of daily delays in June was 24 compared to in the same
period last year where the number of delays was 46 and continued to rise to
52 by October 2022. Additionally in June 2022, there were 9 delays over 90
days, in June 2023 there were 2. Although there has been an increase in
delays from May, delays have reduced over the long term. 
4.7 Bed days lost due to delayed discharges reduced from 751 last quarter to 732
this quarter. This is a reduction despite the increase in the more volatile
snapshot days (DD-01) measure and demonstrates that the trend is
decreasing overall in length of time delayed over this period. 
4.8 Measures mentioned in previous reports continue to be in place: 
• Whole system Moray Portfolio meetings occur daily with operational
staff from all services to ensure system wide awareness of the
pressures that might cause issues with patient flow.
• More care home beds have been made available due to an agreement
to pay from offer of care home bed to ensure beds are free on
discharge date.
• The Planned Discharge Date (PDD) system changed the criterion from
‘medically fit’ to ‘clinically fit’. 
• More people have been recruited into the Care at Home team enabling
more rotas to be opened. 
4.9 Challenges that remain include: 
• Staffing pressures across the care sector in Moray.
• An aging population is resulting in more complex care requirements.
• Lack of respite facility- both planned and emergency. 
4.10 Despite still not achieving the target an immense amount of work has gone
into ensuring the figures in Moray have not escalated and both measures are
now regularly below the pre-pandemic targets. 
Emergency Department 
4.11 There was an increase in the A&E attendance rate per 1,000 this quarter from
20.6 to 23.6, below the number presenting at the same period last year. 
4.12 The increase can be attributed to 2 public holidays and the additional Kings
Coronation holiday during this reporting period, which impacts on attendance
levels at ED as there is no Primary care provision on these dates.  
Page 16

Page 17

Emergency Admissions 
4.13 For the first quarter since March 2021 there was not an increase in the rate of
emergency occupied bed days for over 65s (EA-01). Since the end of quarter
4 2022/23 the rate has decreased from 2,749 to 2,699, while this still exceeds
the target of 2,320 per 1,000 population this decrease is in line with
expectations as the reduction in DD-01 and DD-02 over the recent months is
now impacting this measure. 
4.14 The emergency admission rate per 1000 population for over 65s (EA-02) has
increased this quarter from 185.8 to 186.8 above the target of 177. Similarly,
the number of people over 65 admitted to hospital in an emergency (EA-03)
also increased from 129.2 to 129.8 over the same period. Both of these
indicators are now RED and will explain why the reduction in EA-01 was
small. 
4.15 The increase in admissions in ED can be directly correlated with the increase
in admissions in this period and it is expected that EA-02 and EA-03 should
return to GREEN in the next quarter. 
Mental Health 
4.16 After achieving 79% in quarter 3 2022/23 there has been a reduction in
performance for the second quarter in row with now 63% of patients being
referred within 18 weeks at the end of quarter 1 2023/24. 
4.17 A variety of factors have an impact on this measure: 
• An increase in the number and complexity of referrals,
• Long term sickness absence within the team,
• Ongoing maternity leave and
• A further period of planned sick leave. 
The team continue to work hard to reduce waiting times and are addressing
this through current and planned group work, allowing for more people to be
seen in a timely manner. However, this is not suitable for all people referred
into the service. 
4.18 The service is linked into the Grampian wide Psychological Therapies
Improvement Board, looking at capacity within the service and trajectory
planning. 
4.19 Recruitment to the maternity leave post was not possible due to no applicants
meeting the criteria. As a result of further planned sick leave, it is difficult to
predict when this position may change. 
Staff Management
4.20 Sickness absence for NHS employed staff reduced to 4.7% during quarter 1
2023/24. Council employed staff sickness has also reduced this quarter from
a high of 9.7% to 7.0%, which is lower than the figure for the same period last
year. 
Page 17

Page 18

4.21 The latest available breakdown of data is for quarter 4 2022/23 and this shows
that the percentage of absences that are long term is 53% for NHS employed
staff and 56.5% for council employed staff. 
4.22 Within NHS employed staff 29.9% of absences are marked as “Other known
causes - not otherwise classified” or “Unknown Causes/Not Specified”. While
the top recorded reasons are “Anxiety/stress/depression/other psychiatric
illnesses” with 11.5% of total absences and “Cold, cough, flu-influenza” with
10.1% of total absences. 
Table 1 - NHS Top Ten Absence Reasons (Quarter 4 2022/23)
Absence Reason % of all Absences
Other known causes - not otherwise classified 16.8 %
Unknown causes/not specified 13.1 %
Anxiety/stress/depression/other psychiatric illnesses 11.5 %
Cold, cough, flu - influenza 10.1 %
Gastro-intestinal problems 7.0 %
Covid-related illness 7.0 %
Other musculoskeletal problems 6.9 %
Chest & respiratory problems 6.8 %
Injury, fracture 3.7 %
Pregnancy related disorders 3.4 %
Back problems 3.0 % 
4.23 Within council employed staff the profile is different with 21.5% of absences
recorded as “Depression/Stress/Anxiety” and the second highest recorded
reason being “Joint Pain/Injury” with 8.7% of total absences. 
Table 2 - Council Top Ten Absence Reasons (Quarter 4 2022/23)
Absence Reason  % of all Absences
Depression/Stress/Anxiety 21.5%
Joint Pain/Injury 8.7%
Chest Infection/Bronchitis 7.2%
Covid-19 7.1%
Operation/Post Operation 6.1%
Cold 5.7%
Back Pain/Injury 5.3%
Broken Bones 4.8%
Stomach Upset/Sick/Diarrhoea 4.3%
Bereavement 3.1% 
4.24 Our absence statistics are reflective of NHSG and Council staff and
occupational health reports with mental health reasons representing our first
and largest and muscular-skeletal (MSK) injuries our second largest indicator
of absence. It should be noted that mental health reasons consists of stress in
all varieties: work stress in particular is not specified, and also includes
depression and anxiety. HSE have specified moving and handling and
associated MSK injury as targets for action in 2023-2024. 
4.25 Mitigations for these absences are increased focus on health and wellbeing
within teams and/or services with an emphasis on self-education and self-
Page 18

Page 19

awareness. Assurance is sought from teams regularly that up-to-date training
is in situ and key performance indicators for manual handling will be
implemented. Our new delivery plan for HSCM 2023 specifies removing the
stigma from mental health as one of our designated actions and we are keen
to reinforce this with our staff. 
Social Care – Unmet Need
4.26 The unmet need pressure has shifted throughout the last quarter, the test of
change introduced in January 2023 (outlined in quarter 4) has reduced the
number of people awaiting an assessment from 188 people in January 2023
to 62 at the end of June 2023. 
Figure 2 - People awaiting a social care assessment 
4.27 The increase in completing social work assessments can be attributed to the
rise in figure 3 below is a result of the improved practice.  The number of
people who are waiting for a package of care has increased in the period and
the number of hours of care to be provided has increased accordingly as
shown in Figure 4. This increase for care in the community is from 118 people
in March to 170 people in June 2023. An additional factor impacting this is
care homes having fewer available beds as the quarter has progressed. 
Figure 3 - Number of people waiting for a package of care 
Page 19

Page 20

Figure 4 - Number of hours of care yet to be provided 
4.28 A positive factor for care at home is an improved trend in recruitment with an
additional 21 new staff members during this quarter. This has resulted in an
increase of 3.3% in contractual hours. Absence rate for care at home staff has
reduced to 5.1% which slightly above the baseline of staff absence of 4%. 
4.29 Additionally Care Enablers completed over 200 assessment this quarter to
assist with flow across the system. The Care Enablers support the ‘waiting
well’ agenda, initiating regular supportive conversation whilst waiting for care. 
4.30 Weekly Collaborative Care Home Support Team meetings continue to
scrutinise and support partnership services across Moray. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2022-2032”
Performance management reporting is a legislative requirement under
section 42 of the Public Bodies (Joint Working) (Scotland) Act 2014.   
In addition to publishing an Annual Performance Report, the Moray
Integration Scheme requires that the MIJB will “monitor the performance
of the delivery of integrated services using the Strategic Plan on an
ongoing basis” (para 5.2.2 of the Moray Integration Scheme refers). 
(b) Policy and Legal
None directly associated with this report. 
(c) Financial implications
None directly associated with this report.
Page 20

Page 21

(d) Risk Implications and Mitigation
There are no risk issues arising directly from this report. The long-term
impact of the COVID-19 on the Health and Social Care system are still
unknown and performance measurement will remain flexible to enable
the service to be prepared and react to any future developments. 
(e) Staffing Implications  
None directly associated with this report. 
(f) Property
None directly associated with this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required for the Performance
Framework because there will be no impact, as a result of the report, on
people with protected characteristics. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined for
this policy/activity. It should be noted that extreme weather events, such
as the recent storms, are expected to occur more frequently and with
greater ferocity in future years. In the longer-term there are likely to be
issues with the reduction in availability and increases in costs of fossil
fuels that will pose challenges for the delivery of care services to people
living in rural areas. 
(i) Directions
There are no directions arising from this report. 
(j) Consultations
Senior Management Team, Health and Social Care, consulted as has
Tracey Sutherland, Committee Services Officer, Moray Council and their
comments are incorporated in the report. 
6. CONCLUSION 
6.1 This report provides the MIJB with an overview of the performance of
specified Local and National indicators and outlines actions to be
undertaken to improve performance in Section 4 and expanded on in
APPENDIX 1.   
Authors of Report: Bruce Woodward, Performance Support Officer    
Background Papers: Available on request
Ref: 
Page 21

Page 22

Page 22

Page 23

Appendix 1
PERFORMANCE REPORT
SUPPORTING CHARTS
QUARTER 1
2023/24
(1 APRIL 2023 – 31 JUNE 2023)
Item 6.
Page 23

Page 24

Table of Contents  
Health and Social Care Moray - 1 - 2022-23 Quarter 1 Performance Report
1. TABLE OF CONTENTS
1. Table of Contents ............................................................................................................................. 1
1. Performance Summary .................................................................................................................... 2
Barometer Overview ........................................................................................................................... 2
2. Delayed Discharge - RED .................................................................................................................. 3
DD-01: Number of delayed discharges (including code 9, Census snapshot, at end of quarter) ....... 3
DD-02: Number of Bed Days Occupied by Delayed Discharges per quarter (inc code 9) per 1000 18+
population ........................................................................................................................................... 4
3. Emergency Admissions - RED .......................................................................................................... 5
EA-01: Rate of emergency occupied bed days for over 65s per 1000 population .............................. 5
EA-02: Emergency Admissions rate per 1000 population for over 65s .............................................. 6
EA-03: Number of people over 65 years admitted as an emergency in the previous 12 months per
1000 population .................................................................................................................................. 7
4. Emergency Department – RED ........................................................................................................ 8
AE-01: ED Attendance rates per 1,000 population (All Ages) ............................................................. 8
5. Hospital Re-admissions - GREEN ..................................................................................................... 9
HR-01: Percentage of Emergency Re-admissions to hospital within 28 days - Moray Patients ......... 9
HR-02: Percentage of Emergency Re-admissions to hospital within 7 days - Moray Patients ......... 10
6. Mental Health – RED ..................................................................................................................... 11
MH-01: Percentage of patients commencing Psychological Therapy Treatment within 18 weeks of
referral ............................................................................................................................................... 11
7. Staff Management - RED ............................................................................................................... 12
SM-01: NHS Sickness Absence % of Hours Lost ................................................................................ 12
SM-02: Council Sickness Absence (% of Calendar Days Lost) ............................................................ 12
Appendix 1: Key and Data Definitions .................................................................................................. 14
RAG Scoring Criteria .......................................................................................................................... 14
Peer Group Definition ....................................................................................................................... 14
Appendix 2: Strategic Priorities............................................................................................................. 15
Appendix 3: National Health and Wellbeing Outcomes ....................................................................... 17 
Page 24

Page 25

Performance Summary  
Health and Social Care Moray - 2 - 2022-23 Quarter 1 Performance Report
1. PERFORMANCE SUMMARY
BAROMETER OVERVIEW 
Moray currently has 11 local indicators. Of these 1 is Green, 1 is Amber and 9 are Red. 
Figure 1 - Performance Summary       
Page 25

Page 26

Delayed Discharge - RED  
Health and Social Care Moray - 3 - 2022-23 Quarter 1 Performance Report
2. DELAYED DISCHARGE - RED
Trend Analysis 
The number of delays at the June snapshot was up to 30, up from a low of 16 in May and 26 in the
previous quarter.  There is a lot of variation weekly (and even daily) operationally and the figure of 30
for this measure is on high side for this period. 
Bed days lost due to delayed discharges reduced from 751 last quarter to 732 this quarter. This is a
reduction despite the increase in the more volatile snapshot days (DD-01) measure and demonstrates
that the trend is decreasing overall in Delayed Discharges over this period. 
DD-01: NUMBER OF DELAYED DISCHARGES (INCLUDING CODE 9, CENSUS SNAPSHOT,
AT END OF QUARTER)
Purpose 
Reliably achieving timely discharge from hospital is an important indicator of
quality and is a marker for person centred, effective, integrated, and harm
free care.
Strategic Priority  2: HOME FIRST Linked Indicator(s) DD-02
National Health & Wellbeing Outcomes 2, 3, 5, 7 
Figure 2 – Delayed Discharges 
Indicator Trend – Decreasing
Despite some volatility in numbers from month to month the underlying trend for the number of
people experiencing Delayed Discharge had been decreasing since the end of Quarter 2 2022/23. 
Source Public Health Scotland 
Page 26

Page 27

Delayed Discharge - RED  
Health and Social Care Moray - 4 - 2022-23 Quarter 1 Performance Report 
DD-02: NUMBER OF BED DAYS OCCUPIED BY DELAYED DISCHARGES PER QUARTER (INC
CODE 9) PER 1000 18+ POPULATION 
Purpose  This monitors the number of people delayed in hospital once medically fit
for discharge. Longer stays in hospital are associated with increased risk of
infection, low mood, and reduced motivation.
Strategic Priority  2: HOME FIRST Linked Indicator(s) DD-01
National Health & Wellbeing Outcomes 2, 3, 5, 7 
Figure 3 – Delayed Discharge Bed-days 
Indicator Trend – Decreasing
The number of bed-days are over 2 times the target number of days but this is less than previous
quarters, and similar to quarter 2 2021/22.
Source Public Health Scotland
Page 27

Page 28

Emergency Admissions - RED  
Health and Social Care Moray - 5 - 2022-23 Quarter 1 Performance Report
3. EMERGENCY ADMISSIONS - RED
Trend Analysis
For the first quarter since March 2021 there was not an increase in the rate of emergency occupied
bed days for over 65s. Since the end of quarter 4 2022/23 the rate has decreased from 2,749 to 2,699,
however this still exceeds the target of 2,320 per 1,000 population. 
The emergency admission rate per 1000 population for over 65s has increased this quarter from 185.8
to 186.8 above the target of 177.
Similarly, the number of people over 65 admitted to hospital in an emergency also increased from
129.2 to 129.8 over the same period. Both of these indicators are now RED. 
EA-01: RATE OF EMERGENCY OCCUPIED BED DAYS FOR OVER 65S PER 1000
POPULATION
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a narrative
when viewed together of whether emergency admissions and bed days are
within tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) EA-02, EA-03
National Health & Wellbeing Outcomes 1, 2, 3, 5 
Figure 4 – Emergency Occupied Bed-days (Over 65s) 
Indicator Trend – Increasing
Since the start of 2021 has been increasing and has exceeded the reduced target since quarter 3
2021/22.
Source Health Intelligence  
Page 28

Page 29

Emergency Admissions - RED  
Health and Social Care Moray - 6 - 2022-23 Quarter 1 Performance Report
EA-02: EMERGENCY ADMISSIONS RATE PER 1000 POPULATION FOR OVER 65S
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a story when
viewed together of whether emergency admissions and bed days are within
tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) EA-01, EA-03 
National Health & Wellbeing Outcomes  1, 2, 3, 5 
Figure 5 – Emergency Admissions (Over 65s) 
Indicator Trend – Increasing
The trend is now increasing, after a sustained reduction over the latter half of 2022, and above
levels seen at the same point in 2022.
Source Health Intelligence  
Page 29

Page 30

Emergency Admissions - RED  
Health and Social Care Moray - 7 - 2022-23 Quarter 1 Performance Report
EA-03: NUMBER OF PEOPLE OVER 65 YEARS ADMITTED AS AN EMERGENCY IN THE
PREVIOUS 12 MONTHS PER 1000 POPULATION
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a story when
viewed together of whether emergency admissions and bed days are
within tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) EA-01, EA-02
National Health & Wellbeing Outcomes 1, 2, 3, 5 
Figure 6 – Number of Over 65 People Emergency Admissions 
Indicator Trend – Increasing
The trend is now increasing, after a sustained reduction over the latter half of 2022, and above
levels seen at the same point in 2022.
Source Health Intelligence  
Page 30

Page 31

Emergency Department – RED  
Health and Social Care Moray - 8 - 2022-23 Quarter 1 Performance Report
4. EMERGENCY DEPARTMENT – RED
Trend Analysis 
There was an increase in the rate per 1,000 this quarter from 20.6 to 23.6, below the number
presenting at the same period last year.
AE-01: ED ATTENDANCE RATES PER 1,000 POPULATION (ALL AGES)
Purpose  A greater system-wide understanding of how people access emergency
care, and why certain choices are made, will allow local health systems to
develop intelligence about avoidable attendances at emergency
departments and target their responses. 
Strategic Priority  3: PARTNERS IN CARE Linked Indicator(s) HR-01, HR-02
National Health & Wellbeing Outcomes  1, 2, 3, 5 
Figure 7 – ED Attendance Rate 
Indicator Trend – Stable
During quarter 3 the attendance rate per 1,000 population has remained stable, sitting just
above the target level. However, the attendance rate has fallen below the target in the last
quarter of 2022/23.
Source Health Intelligence  
Page 31

Page 32

Hospital Re-admissions - GREEN  
Health and Social Care Moray - 9 - 2022-23 Quarter 1 Performance Report
5. HOSPITAL RE-ADMISSIONS - GREEN
Trend Analysis 
The 28-day re-admissions remain on target at 8.1%, as does the 7-day re-admissions which have
increased slightly to 4.0%. 
HR-01: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO HOSPITAL WITHIN 28 DAYS
- MORAY PATIENTS
Purpose  Re-admissions are often undesirable for patients and have also been shown
to be associated with the quality of care provided to patients at several
stages along the clinical pathway, including during initial hospital stays,
transitional care services and post-discharge support. (This measure lags by
a month due to the time required for a potential 28 day discharge to occur)
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) HR-02, AE-01
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 8 – 28-dayEmergency Readmissions 
Indicator Trend – Stable
28-day Hospital Re-admissions have remained around the target of 8.4% for this quarter.
Source Health Intelligence  
Page 32

Page 33

Hospital Re-admissions - GREEN  
Health and Social Care Moray - 10 - 2022-23 Quarter 1 Performance Report
HR-02: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO HOSPITAL WITHIN 7 DAYS -
MORAY PATIENTS
Purpose  Re-admissions are often undesirable for patients and have also been shown
to be associated with the quality of care provided to patients at several
stages along the clinical pathway, including during initial hospital stays,
transitional care services and post-discharge support.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) HR-01, AE-01
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 9 – 7-day Emergency Readmissions 
Indicator Trend – Stable
7-day Hospital Re-admissions have remained around the target of 4.2% for this quarter.
Source Health Intelligence
Page 33

Page 34

Mental Health – RED  
Health and Social Care Moray - 11 - 2022-23 Quarter 1 Performance Report
6. MENTAL HEALTH – RED 
Trend Analysis 
After achieving 79% in quarter 3 2022/23 there has been a reduction in performance for the second
quarter in row with now 63% of patients being referred within 18 weeks at the end of quarter 1
2023/24. 
MH-01: PERCENTAGE OF PATIENTS COMMENCING PSYCHOLOGICAL THERAPY
TREATMENT WITHIN 18 WEEKS OF REFERRAL
Purpose  Timely access to healthcare is a key measure of quality and that applies
equally in respect of access to mental health services.
Strategic Priority  3: PARTNERS IN CARE Linked Indicator(s) 
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 10 – Psychological Therapy Treatment within 18 Weeks 
Indicator Trend – Increasing
After being consistently low for 4 quarters the rate has started to return to pre pandemic levels.
Source Health Intelligence  
Page 34

Page 35

Staff Management - RED  
Health and Social Care Moray - 12 - 2022-23 Quarter 1 Performance Report
7. STAFF MANAGEMENT - RED
Trend Analysis 
Sickness absence for NHS employed staff reduced to 4.7% during quarter 1 2023/24. Council
employed staff sickness has reduced this quarter from a high of 9.7% to 7.0 %, which is lower than
the figure for the same period last year.   
SM-01: NHS SICKNESS ABSENCE % OF HOURS LOST
Purpose  Attendance at work of all employees is essential in the interests of the
effective and efficient operation of services.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) SM-02
National Health & Wellbeing Outcome  8 
Figure 11 – NHS Sickness Absence 
Indicator Trend – Increasing
This indicator had been increasing over 2022/23 and continues to do so. 
Source Health Intelligence 
SM-02: COUNCIL SICKNESS ABSENCE (% OF CALENDAR DAYS LOST)
Purpose  Attendance at work of all employees is essential in the interests of the
effective and efficient operation of services.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) SM-01
Page 35

Page 36

Staff Management - RED  
Health and Social Care Moray - 13 - 2022-23 Quarter 1 Performance Report
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 12 – Moray Council Sickness Absence 
Indicator Trend – Increasing
This indicator continues to rise, remaining double the target and close to the figure of 10%. 
Source Council HR 
Page 36

Page 37

Staff Management - RED  
Health and Social Care Moray - 14 - 2022-23 Quarter 1 Performance Report
APPENDIX 1: KEY AND DATA DEFINITIONS
RAG SCORING CRITERIA
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within specified tolerance.
RED If Moray is performing worse than target but outside of specified
tolerance. 
PEER GROUP DEFINITION
Moray is defined as being in Peer Group 2 in the Local Government Benchmarking Framework 
Family Group 1 Family Group 2 Family Group 3 Family Group 4
East Renfrewshire
East Dunbartonshire
Aberdeenshire
Edinburgh, City of
Perth & Kinross
Aberdeen City
Shetland Islands
Orkney Islands
Moray
Stirling
East Lothian
Angus
Scottish Borders
Highland
Argyll & Bute
Midlothian
Falkirk
Dumfries & Galloway
Fife
South Ayrshire
West Lothian
South Lanarkshire
Renfrewshire
Clackmannanshire
Eilean Siar
Dundee City
East Ayrshire
North Ayrshire
North Lanarkshire
Inverclyde
West Dunbartonshire
Glasgow City 
Page 37

Page 38

Staff Management - RED  
Health and Social Care Moray - 15 - 2022-23 Quarter 1 Performance Report
APPENDIX 2: STRATEGIC PRIORITIES 
Page 38

Page 39

Staff Management - RED  
Health and Social Care Moray - 16 - 2022-23 Quarter 1 Performance Report 
•EA-01: RATE OF EMERGENCY OCCUPIED BED DAYS FOR OVER
65S PER 1000 POPULATION
•EA-02: EMERGENCY ADMISSIONS RATE PER 1000 POPULATION
FOR OVER 65S
•EA-03: NUMBER OF PEOPLE OVER 65 YEARS ADMITTED AS AN
EMERGENCY IN THE PREVIOUS 12 MONTHS PER 1000
POPULATION
•HR-01: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO
HOSPITAL WITHIN 28 DAYS -MORAY PATIENTS
•HR-02: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO
HOSPITAL WITHIN 7 DAYS -MORAY PATIENTS
•SM-01: NHS SICKNESS ABSENCE % OF HOURS LOST
•SM-02: COUNCIL SICKNESS ABSENCE (% OF CALENDAR DAYS
LOST)
BUILDING
RESILIENCE
•DD-01: NUMBER OF DELAYED DISCHARGES (INCLUDING CODE 9,
CENSUS SNAPSHOT, AT END OF QUARTER)
•DD-02: NUMBER OF BED DAYS OCCUPIED BY DELAYED
DISCHARGES PER QUARTER (INC CODE 9) PER 1000 18+
POPULATION
•UN-01: NUMBER OF LONG-TERM HOME CARE HOURS UNMET
AT WEEKLY SNAPSHOT
•UN-02: NUMBER OF PEOPLE WITH LONG-TERM CARE HOURS
UNMET AT WEEKLY SNAPSHOT
HOME
FIRST
•OA-01: NUMBER OF REVIEWS OUTSTANDING AT END OF
QUARTER SNAPSHOT
•MH-01: PERCENTAGE OF PATIENTS COMMENCING
PSYCHOLOGICAL THERAPY TREATMENT WITHIN 18 WEEKS OF
REFERRAL
•AE-01: A&E ATTENDANCE RATES PER 1000 POPULATION (ALL
AGES)
PARTNERS
IN CARE
Page 39

Page 40

Staff Management - RED  
Health and Social Care Moray - 17 - 2022-23 Quarter 1 Performance Report
APPENDIX 3: NATIONAL HEALTH AND WELLBEING OUTCOMES
1 - PEOPLE ARE ABLE TO LOOK AFTER AND IMPROVE THEIR OWN HEALTH AND WELLBEING AND
LIVE IN GOOD HEALTH FOR LONGER. 
2 - PEOPLE, INCLUDING THOSE WITH DISABILITIES OR LONG-TERM CONDITIONS, OR WHO ARE
FRAIL; ARE ABLE TO LIVE, AS FAR AS REASONABLY PRACTICABLE, INDEPENDENTLY AT HOME,
OR IN A HOMELY SETTING IN THEIR COMMUNITY. 
3 - PEOPLE WHO USE HEALTH AND SOCIAL CARE SERVICES HAVE POSITIVE EXPERIENCES OF
THOSE SERVICES, AND HAVE THEIR DIGNITY RESPECTED. 
4 - HEALTH AND SOCIAL CARE SERVICES ARE CENTRED ON HELPING TO MAINTAIN OR IMPROVE
THE QUALITY OF LIFE OF PEOPLE WHO USE THOSE SERVICES. 
5 - HEALTH AND SOCIAL CARE SERVICES CONTRIBUTE TO REDUCING HEALTH INEQUALITIES. 
6 - PEOPLE WHO PROVIDE UNPAID CARE ARE SUPPORTED TO LOOK AFTER THEIR OWN HEALTH
AND WELLBEING, INCLUDING TO REDUCE ANY NEGATIVE IMPACT OF THEIR CARING ROLE ON
THEIR OWN HEALTH AND WELLBEING. 
7 - PEOPLE USING HEALTH AND SOCIAL CARE SERVICES ARE SAFE FROM HARM. 
8 - PEOPLE WHO WORK IN HEALTH AND SOCIAL CARE SERVICES FEEL ENGAGED WITH THE WORK
THEY DO AND ARE SUPPORTED TO CONTINUOUSLY IMPROVE THE INFORMATION, SUPPORT,
CARE, AND TREATMENT THEY PROVIDE. 
9 - RESOURCES ARE USED EFFECTIVELY AND EFFICIENTLY IN THE PROVISION OF HEALTH AND
SOCIAL CARE SERVICES.
Page 40

Page 41

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 31 AUGUST 2023 
SUBJECT: INTERNAL AUDIT SECTION - UPDATE REPORT 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 Committee is asked to consider the contents of this report; seek 
clarification on any points noted and otherwise note the report..   
2. RECOMMENDATION 
2.1 The Audit, Performance and Risk Committee is asked to consider and
note this audit update. 
3.  BACKGROUND 
3.1 Public Sector Internal Audit Standards (PSIAS) require the Chief Internal
Auditor to prepare and present reports to committee on internal audit’s activity
relative to the audit plan and on any other relevant matters. 
4.  KEY MATTERS RELEVANT TO RECOMMENDATION 
Audit Plan 2023/24
4.1 It is pleasing to report that the Internal Audit Section is progressing with
completing the Audit Plan for 2023/24. An audit to review the system for
administering the disabled parking permits, also known as Blue Badges has
been completed. Fieldwork is progressing with the review of the Occupational
Therapy Services Stores. This audit used the Chartered Institute of Public
Finance Accountants audit programme as the basis to review the systems and
controls. The audit of the commissioning and delivery of social care services
to children has also been started. This review will compliment the audit
undertaken of the adult social care commissioning service that a private firm
of auditors completed in 2022/23.   
Follow Up Reviews 
4.2 Internal Audit reports are regularly presented to elected members detailing not
only findings but also the responses by management to the recommendations
with agreed dates of implementation. Internal Audit will also undertake follow
Item 7.
Page 41

Page 42

up reviews to evidence the effective implementation of these
recommendations. Please see detailed the following completed follow up
review: 
Business Continuity
4.3 An audit review was undertaken of the management arrangements for
Business Continuity. Business Continuity Management concerns how
potential incidents are identified and how the risk is managed to ensure the
Service can continue delivering essential services in an emergency or during
a disruption of normal day-to-day activities. The follow up review found that
several recommendations had not been fully implemented. However, with the
appointment last year of a part time Business Continuity and Risk
Management Officer, this has facilitated progress to further develop business
continuity arrangements within Services. Revised implementation dates for
the recommendations have been agreed. The Follow Up Report is given
in Appendix 1. 
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Partners in
Care 2022 – 2032”
Internal audit work supports good governance and assists in securing
appropriate  systems of internal control. 
(b)  Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications
Audit reports highlight risk implications and contain recommendations for
management to address as a means of mitigating.   
(e) Staffing Implications
No implications directly arising from this report 
(f)   Property
No implications. 
(g)  Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions 
None arising directly from this report. 
Page 42

Page 43

(j)   Consultations
There have been no direct consultations during the preparation of this       
report.     
6. CONCLUSION 
6.1 This report provides committee with an update on internal audit work
progressed in the latest review period. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/31082023 
Page 43

Page 44

Page 44

Page 45

Appendix 1
Moray Council
Internal Audit Section 
1
DEPARTMENT: Education, Communities & Organisational Development 
SUBJECT:  Business Continuity 
REPORT REF: 22'008 
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: The Council's Business Continuity Policy has been formally approved, is reviewed at regular intervals and is supported by procedures and
guidelines for consistent application across the organisation. 
5.01 The Council's Business Continuity
Policy should be reviewed and
updated as required. Policies and
procedures once implemented
should be reviewed at regular,
Medium Yes 28/02/2022 Not implemented. The policy has been
acknowledged as requiring updating. This needs to
be done having regard to statutory obligations,
critical functions of the Council, the response to the
pandemic, and identified links with risk
management and emergency planning. These
Item 7.
Page 45

Page 46

Appendix 1
Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
stated, intervals.    matters are under consideration with CMT/SMT
and the timescale for finalising the policy has been
extended to 31st October 2023. This will ensure the
final approved version reflects up-to-date strategic
priorities and makes best use of resources
available to support this area of work. 
Key Control: Business Continuity Plans are in place for all critical service areas and these plans are fully tested and regularly reviewed. 
5.02 Current and finalised Business
Continuity Plans, should be held
covering all critical services
identified by the organisation.   
Medium Yes 31/10/2022 Not implemented. Critical functions of the Council
were affirmed during the pandemic. These have
been reviewed in the context of impacts from
potential power outages that threatened disruption
over the winter period. This identified the specific
plans that need to be updated as a priority and work
on these is ongoing. Plans for other critical service
areas will be updated dependent on assessed risk
as work continues to align business continuity
requirements with risk management practice. A
programme of work will be developed for the 23/24
Page 46

Page 47

Appendix 1
Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
year with a revised implementation date for
business plans covering all critical activities to be in
place by 31st March 2024. 
5.03 All Business Continuity Plans
should be reviewed and tested on
at least an annual basis, with
outcomes analysed and
documented, to ensure plans are
capable of supporting an effective
recovery position.   
Medium Yes 28/02/2023 Not implemented. The focus currently is on bringing
the business continuity plans up-to-date; part of this
process will involve discussions with relevant
managers to ensure proposals are achievable in
practice. Updating of plans will continue with a
revised completion date of 31st March 2024 and
formal testing of plans thereafter will be on an 'as
and when' required basis. 
Key Control: Business Continuity is embedded into the culture of the organisation with all relevant officers appropriately trained and sound central governance
arrangements in place.
5.04 A training programme should be
developed to assist officers in the
preparation and implementation of
Medium Yes 30/06/2022 Implemented. Service Managers are being
supported in the development of service risk
registers and business continuity plans through
briefing sessions held by the Business Continuity &
Page 47

Page 48

Appendix 1
Moray Council
Internal Audit Section 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
the business continuity
management process.     
Risk Management Officer appointed in June 2022.   
5.05 The roles and responsibilities of
the Business Continuity Officer as
detailed within the Business
Continuity Policy should be
undertaken. 
Medium Yes 28/02/2022 Implemented. A Business Continuity and Risk
Management Officer was appointed on a part-time
basis in June 2022. The Officer is currently
progressing the business continuity agenda and
implementing the recommendations within this
audit report. 
Page 48

Page 49

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 31 AUGUST 2023 
SUBJECT: STRATEGIC RISK REGISTER – AUGUST 2023 
BY:  CHIEF OFFICER 
1. REASON FOR REPORT 
1.1 To provide an overview for the Audit, Performance and Risk Committee of the
current strategic risks, along with a summary of actions which are in place to
mitigate those risks, updated August 2023. 
2. RECOMMENDATION 
2.1 It is recommended that the Audit, Performance and Risk Committee
agree to: 
i) consider and note the updated Strategic Risk Register included in
APPENDIX 1; and 
ii) note the Strategic Risk Register will be further refined to align with
the transformation, redesign and delivery plans as they evolve 
3. BACKGROUND 
3.1 The strategic risk register is reviewed regularly by the Senior Management
Team as part of a robust risk monitoring framework, to identify, assess and
prioritise risks related to the delivery of services in relation to delegated
functions, particularly any which are likely to affect the delivery of the Strategic
Plan. 
3.2 The Moray Integration Joint Board (MIJB) Strategic Risk Register is attached
to this report at APPENDIX 1 and sets out the inherent risks being faced by
the MIJB, together with a current assessment on the level of the risks and
mitigating actions being taken to reduce the impact of the risks.  This report is
presented to Audit, Performance and Risk Committee for their oversight and
comment. 
3.3 Risk scores are weighted, based on assessment according to their likelihood
and corresponding impact, as per Section 5 of the MIJB Risk Policy.   
Item 8.
Page 49

Page 50

3.4 The Strategic Risks received an initial review to ensure they align to the
Moray Partners in Care 2019-2029 strategic plan which was agreed at MIJB
on 22 November 2022 (para 14 of the minute refers). 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The Risk Management Framework review was completed and outcome was
approved by the Board on 25 June 2020 (para 9 of the minute refers). The
approved Risk Appetite Statements have been included in APPENDIX 1. 
4.2 There remains considerable financial pressure as presented to the MIJB on
30 March 2023. There is additional pressure to achieve further savings in
2023/24 and beyond. The Chief Officer and Chief Financial Officer continue to
work with Senior Managers to seek efficiencies and opportunities for real
transformation. 
4.3 GP and Dental service sustainability remains a significant issue nationally. 
4.4 There is a continued risk of Industrial Action that may affect service delivery
and potentially increase the financial cost pressures to meet any pay awards,
if not funded centrally. 
4.5 The responsibilities placed on Health and Social Care Moray (HSCM) as a
Category 1 responder continues to increase. This is without any additional
resource allocation. 
4.6 Demand for unscheduled hospital care has not reduced, as levels of elective
activity increase to capacity, that continues to be managed alongside
significant bed occupancy for emergency medicine. 
4.7 Work is ongoing to ensure all Risk Registers are updated in the timescales
dictated by the criteria. Adverse events and Risk are regularly reviewed and
discussed by Service Managers and Senior Managers. These now feature on
the Senior Leadership Group agenda to ensure full transparency across the
system. 
4.8 Recruitment and retention continues to provide challenges across all
disciplines. The Moray Health and Social Care Workforce Plan was approved
by MIJB on 29 September 2022 (section 12 minute refers to). Work has
started to consider the implications of the Health and Care (Staffing)
(Scotland) Act 2019. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2019-2029”
The MIJB requires effective governance arrangements for those services
and functions delegated to it and Risk Management systems are integral
to this. 
(b) Policy and Legal
As set out in the terms of reference, the Board has responsibility to
provide assurance of the adequacy of the risk management framework.
Page 50

Page 51

There are no legal implications arising from this report.  
(c) Financial implications
There are no direct financial implications arising from this report however
the Board should note the failure to manage risks effectively could have
a financial impact for the MIJB. 
(d) Risk Implications and Mitigation
This report forms part of the governance arrangements for identifying
and managing strategic risks of the MIJB.  The risks are outlined in the
body of the report in section 4. 
(e) Staffing Implications
There are no additional staffing implications arising from this report.   
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required because there are no
service, policy or organisational changes being proposed. 
(h) Climate Change and Biodiversity Impacts
There are no impacts arising from this report. 
(i) Directions
None arising from this report. 
(j) Consultations
Consultation on this report has taken place with members of the Senior
Management Team. 
6. CONCLUSION 
6.1 This report and appendices contains proposed risk appetite statements
that, when approved, will underpin the MIJB approach to strategic
decision making.   
6.2 The report outlines the current position and recommends the Board note
the revised and updated version of the Strategic Risk Register. 
Author of Report:  Sonya Duncan, Corporate Manager
Background Papers:   held by HSCM
Ref: 
Page 51

Page 52

Page 52

Page 53

Appendix 1 
HEALTH AND SOCIAL CARE MORAY STRATEGIC RISK REGISTER 
AS AT AUGUST 2023 
Item 8.
Page 53

Page 54

Appendix 1 
RISK SUMMARY 
1. The Moray Integration Joint Board (MIJB) does not function as set out within the Integration Scheme, Strategic Plan and in-line
with Standing Orders and fails to deliver its objectives or expected outcomes.  
2. There is a risk of MIJB financial failure in that the demand for services outstripping available financial resources.  Financial
pressures being experienced by the funding Partners will directly impact on decision making and prioritisation of MIJB.
3. Inability to recruit and retain qualified and experienced staff to provide safe care whilst ensuring staff are fully able to manage
changes resulting from integration.
4. Inability to demonstrate effective governance and effective communication and engagement with stakeholders.
5. Inability to cope with unforeseen external emergencies or incidents as a result of inadequate emergency and resilience planning.
6. Risk to MIJB decisions resulting in litigation/judicial review.  Expectations from external inspections are not met.
7. Inability to achieve progress in relation to national Health and Wellbeing Outcomes.  Performance falls below acceptable level.
8. Inability to progress with delivery of Strategic Objectives and Transformation projects as a result of inability to resolve data sharing
and data security requirements.
9. Requirements for support services are not prioritised by NHS Grampian and Moray Council. 
RISK RATING LOW  MEDIUM HIGH  VERY HIGH
RISK MOVEMENT  DECREASE NO CHANGE INCREASE 
The process for managing risk is documented out with the MIJB Risk Policy. 
Page 54

Page 55

Appendix 1 
Description of
Risk: 
Regulatory
The Integration Joint Board (IJB) does not function as set out within the Integration Scheme, Strategic Plan and
Scheme of Administration and fails to deliver its objectives or expected outcomes.  
Lead: Chief Officer
Risk Rating:  Low/ medium/ high/ very high  MEDIUM
Risk Movement:  Increase/ decrease/ no change  NO CHANGE
Rationale for Risk
Rating: 
The strategic plan “Partners in Care 2019-2029” was revised and presented as “Partners in Care 2022 to 2032”, this was
approved by MIJB in November 2022.  
Membership of IJB committees recently changed due to the elections in May.  An amendment to the Scheme to increase
membership by one from each of the partner organisations was ratified in March 2022 by the Scottish Government
following due process and approval by Moray Council and NHS Grampian Board.
During the initial Covid 19 response, normal business was suspended and emergency arrangements were implemented. 
IJB, CCG and APR meetings restarted during August 2020.  Weekly meetings were instigated with Chair/Vice Chair and
Chief Officer and these continue.  A delivery plan for the new Strategic Plan “Partners in Care” 2022-32 will be presented
in 2023.
Rationale for Risk
Appetite: 
The Board, staff and providers across Moray are all committed to ensuring high standards of clinical care & governance
through operational policies.  Innovation and new ways of working may mean traditional regulations do not exist, or are
contradictory. 
We will only take regulatory risks knowingly, following consultation with the relevant regulatory body and where we have
clear risk mitigation in place. 
Controls: • Integration Scheme.
• Strategic Plan “Partners in Care” 2022-32
• Governance arrangements formally documented and approved by MIJB January 2021.
• Agreed risk appetite statement.
• Performance reporting mechanisms.
• Consultation with legal representative for all reports to committees and attendance at committee for key reports.
• Standing orders have been reissued to all members
Mitigating
Actions: 
Induction sessions were held for new IJB members after May elections. Further sessions were arranged for newest
appointees.
IJB member briefings are held regularly as development sessions. 
1
Page 55

Page 56

Appendix 1 
Conduct and Standards training held for IJB Members in June 2022 provided by Legal Services.
SMT regular meetings and directing managers and teams to focus on priorities. 
Regular development sessions held with IJB and System Leadership Group
Strategic Plan and locality management structure is in place. The work that has been progressed through the Covid19
response has escalated developments in some areas as a matter of priority.  This has been achieved through
collaborative working with partner organisations and the third sector. 
Assurances: • Audit, Performance and Risk Committee oversight and scrutiny.
• Internal Audit function and Reporting
• Reporting to Board.
• The Moray Transformation Board has recently recommenced and will support an oversight of planned business
across HSCM.
Gaps in
assurance:
The new strategic delivery plan and will incorporate the work being taken forward for Self-Directed support, Hospital at
Home and Locality Planning. 
Current
performance:
The Scheme of Administration is reported when any changes are required.  
Legal advisors are currently working on the requirements to the integration scheme in relation to the proposed The
integrated scheme of delegation of Children’s and Families and Justice Services was presented and accepted by MIJB
on 26th January 2023.
The Governance Framework was approved by IJB 28 January 2021. Re-appointment of Standards Officer agreed by
IJB 31 March 2022.
Members Handbook has been updated and circulated to all members in June 2022.
Comments: Strategic Planning and Commissioning Group approved the generic Terms of Reference and Chairs of the
transformation boards at the meeting on 19 December 2019.These groups have now recently recommenced following
the pause during the Covid19 response. The Interim Strategy and Planning Lead is now taking this forward and
prioritising and focusing on strategic planning and priorities over the short and longer term. 
Page 56

Page 57

Appendix 1 
2
Description of
Risk: 
Financial
There is a risk of MIJB financial failure in that the demand for services outstrips available financial resources.  Financial
pressures being experienced both by the funding Partners and Community Planning Partners will directly impact on
decision making and prioritisation of MIJB.
Lead: Chief Officer/Chief Financial Officer
Risk Rating:  Low/ medium/ high/ very high VERY HIGH
Risk Movement:  Increase/ decrease/ no change INCREASING
Rationale for Risk
Rating: 
The 2023/24 settlement only saw additional investment for health and social care that was passed through to the MIJB
and in 2023/24 saw funding for recurring commitments. There remains a significant pressure due to the recurring core
overspend, since most of the new investment related to new commitments. 
Financial settlements are set to continue on a one year only basis, which does not support sound financial planning.  
In addition, the carried forward ear marked reserves have been significantly reduced with the clawback of the Covid
reserve and reduction of the PSIF funding in 2022/23 .  The impact of which will be to reduce the level of ear marked
reserves in the MIJB. 
The Revenue Budget 2023/24 was approved by MIJB on 30 March 2023 as a balanced budget.  A significant ambitious
savings plan of £4.1 million was approved.  Additional Scottish Government funding was provided again for 2023/24, this
is to meet additional recurring policy commitments in respect of adult social care pay uplift for externally provided services
and free personal and nursing care rates.  
The update medium Term Financial Framework was presented as part of the budget papers on the 30th March 2023 this
will be further reviewed during the 2023/24 year to ensure alignment with the recently reviewed Strategic Plan and for the
delegation of Childrens Services and Criminal Justice is planned to be presented to MIJB by 30 September 2023.
Rationale for Risk
Appetite: 
The Board recognises the financial constraints all partners are working within. While we are cautious and open about
accepting financial risks this will be done: 
• Where a clear business case or rationale exists for exposing ourselves to the financial risk 
• Where we can protect the long term sustainability of health & social care in Moray   
Controls: There is an interim arrangement for CFO cover from Moray Council. Permanent recruitment efforts have not been
successful. The Chief Officer is working with both the Council and NHS Finance Leads to secure a longer term interim
arrangement. 
The CFO and Senior Management Team have worked together to address further savings which were approved by the
Board as part of the budget setting procedures for 2023/24.  This will be a focus of continuous review to ensure any
investment is made taking cognisance of existing budget pressures.  A revised Financial Framework was presented to
Page 57

Page 58

Appendix 1 
the MIJB on 30 March 2023, and a further review will take place by 30 September 2023. The Senior Management
Team will continue to consider and plan for the financial challenges for 2024/25 and beyond.
Mitigating
Actions: 
Risk remains of the challenge that the MIJB can deliver transformation and efficiencies at the pace required whilst dealing
with the emerging financial pressures.    
Financial information is reported regularly to both the MIJB, Senior Management Team and System Leadership Group. 
The Chief Officer and Chief Financial Officer (CFO) continue to regularly engage in finance discussions with key
personnel of both NHS Grampian and Moray Council.   
Chief Officer and CFO will continue to engage with the partner organisations in respect of the financial position throughout
the year. Cross partnership performance meetings are in with partner CEOs, Finance Directors and the Chair/Vice Chair
of the MIJB. 
Assurances: MIJB oversight and scrutiny of budget.  Reporting through MIJB, NHS Grampian Board and Moray Council.
Gaps in
assurance:
None known
Current
performance:
An overspend of £5,280,372 on Core services for the 2022/23 financial year was reported to the IJB on 29 June 2023. 
Comments: Senior managers continue to work with Chief Officer and Chief Financial Officer to address the continuing financial
challenge, continuing to seek efficiencies and opportunities for real transformation as we look to make efficient and
effective investment in services that are truly transformational. There are additional pressures from the cost of living
crisis, increasing energy bills, inflation and staff pay awards. 
Page 58

Page 59

Appendix 1 
3
Description of
Risk: 
Human Resources
(People):
Inability to recruit and retain qualified and experienced staff to provide and maintain sustainable, safe care, whilst
ensuring staff are fully able to manage change resulting from response to external factors such as the impact of Covid
and the actions that arose from the recommendations from the Independent Review of Adult Social Care 2021.
Lead: Chief Officer
Risk Rating:  Low/ medium/ high/ very high HIGH
Risk Movement:  Increase/ decrease/ no change NO CHANGE
Rationale for Risk
Rating: 
There continues to be issues with recruitment to front line services that require specific skills and experience.  This has
been the case for some time now and continues to place pressure on existing staff.  Allied Health Professions, Social
Work and Nursing are some of the particular areas experiencing difficulties with obtaining people with the appropriate
skills and training. Care at Home staffing levels are pressured for Internal services and externally with local providers all
experiencing the same difficulties. 
There are also impacts on recruitment of Dentists and other graduates arising from Covid as the number graduating has
reduced during the period.
The various impacts of Covid-19 has  placed a significant strain on the Partnerships resources across frontline and
support functions and this has resulted in delays for the progress of projects relating to the achievement of strategic
objectives.  HSCM continues to review the large number of fixed term and seconded posts. This will continue as temporary
contracts conclude. It is hoped that this will improve some of the instability teams felt during the pandemic response. This
will also allow consideration of post redesign, service needs and potential financial savings. This will continue to be
reviewed by the Senior Management Team.
Care Homes in Moray continue to face difficulties with recruitment and retention of staff.  Efforts are being made to provide
support but the situation remains challenging. 
The transition from EU membership has not presented any specific concerns for workforce and this will continue to be
monitored. 
The impact of forthcoming budget allocations and the withdrawal of all Covid funding will also mean that HSCM will face
some challenging recruitment decisions in 2023. 
The impact of budgetary decisions by the Council in relation to reducing staffing levels has reduced levels of support
provided in some key areas Health and Social Care Moray (HSCM), such as ICT, HR, Legal and design.  
The lack of suitable housing for Health and Social Care staff has resulted in people not being able to take up posts in
Moray. 
GP sustainability remains a national issue.
Page 59

Page 60

Appendix 1 
Rationale for Risk
Appetite:
Safety risks that could result in harm to service users, staff or the public are inherent in Health & Social Care services.
The safety of individuals is paramount therefore standards of safety management and clinical care have to be high, and
the Board will continue to seek assurances this is the case. 
The Board’s ambition is for health & social care to be people centred. This means supporting people in decision making
about their own health & care, which may expose individuals to higher risk where they make an informed decision. 
The Board will also seek to balance individual safety risks with collective safety risks to the community. 
Controls: Management structure in place with updates reported to the MIJB. 
Organisational Development plan in place and Workforce Plans are being updated to align to the new strategic plan. 
Continued activity to address specific recruitment and retention issues.   
Management competencies continue to be developed through Kings Fund training although this was suspended due to
Covid19. A 2 day event was held on 16/17 May 2023, attended by the Senior Management Team as part of a Grampian
wide event.
Communications & Engagement Strategy was approved in November 2019 and continues.
Council and NHS performance systems in operation with HSCM reporting being further developed and information
relating to vacancies, turnover and staff absences is integral to this.  
Managers are highlighting any areas of concern and where appropriate this is identified in operational risk registers.
HSCM services have commenced weekly reporting of workforce sit reps for Senior Management Team oversight
highlighting vacancies, annual leave, sickness absence and Covid impacts so that issues can be identified and
assessed quickly.  
Moray Council are carrying out a study of accommodation needs, including people working in the Health and Care
sector.
Mitigating
Actions: 
System re-design and transformation.  
Organisational Development Plan and Workforce plan were updated and approved by MIJB in November 2019. The
updated Workforce plan has been submitted to Scottish Government and comments were received by the HSCP in
October 2022. These are currently being worked through.  These plans are core documents for the Workforce Forum
which has recently re-commenced following a temporary suspension during the first quarter of this year due to Covid
impact. 
Staff Wellbeing is a key focus and there are many initiatives being made available to all staff including training, support,
information and access to activities. 
Locality Managers have developed Multi-disciplinary teams in their areas and project officer support was been provided
to develop the locality planning model across Moray.
Page 60

Page 61

Appendix 1 
Lead Managers are involved in regional and national initiatives to ensure all learning is adopted to improve this position.
Lead Managers and Professional Leads are linked to University Planning for intakes and programmes for future
workforce development. 
HSCM are working with Digital Health and Care Innovation Centre as partners on the Digital Health Improvement
programme to research and design innovative ways to address the needs of citizens, versus the challenges of
recruitment and skills available within Moray. 
Incentives have been secured to try and attract additional NHS dentists and dental practices to our area. The Scottish
Dental Access Initiative now includes Moray, with grants of £50,000 and above available to allow dental practices to be
established or extended– provided there is a seven-year commitment to providing NHS treatment. A recruitment and
retention bonus is also being offered to eligible new dentists in Moray. 
GP sustainability Group and Primary Care Vison for the Future Groups in situ. 
Work is underway across the system to consider the implications of the Health and Care (Staffing) (Scotland) Act 2019. 
Assurances: Operational oversight by Moray Workforce Forum has resumed and will report to MIJB in accordance with the agreed
Governance framework.
The HSCM Response Group was in place over the whole period of the Covid19 pandemic providing focussed
leadership around emerging issues and resolving them.  This group stood up again in April and is meeting daily whilst
the system is pressured, this will be reviewed as the situation evolves.  The Heads of Service are co-ordinating and
escalate to SMT where necessary. These meetings have been increased as service needs dictate.
Gaps in
assurance:
Further work required to develop workforce plans to reflect strategic plan implementation programmes.
Current
performance:
The iMatter survey results for 2022 were received by managers for review and action plans.  Preparatory work has
commenced on the plans for iMatter 2023/24. 
Discussions are underway with HR in both Council and NHS to develop access to appropriate HR information at a
summarised level to facilitate the necessary workforce planning and subsequent monitoring of plans. 
There continues to be a need for more streamlining in recruitment processes as the delay in approval to recruit to having
a member of staff available is in excess of 8 weeks. 
There is also a lack of suitable applicants for various posts which is impacting on ability to appoint for some roles. 
Page 61

Page 62

Appendix 1 
Comments: Staffing issues are owned by the Systems Leadership Group who will work collaboratively across the system to seek
opportunities to make jobs more attractive where it has proved difficult to recruit in the past.   
For some professions there is a potential risk that staff move from one position to a new position within HSCM will just
move the vacancy to elsewhere in the system, so Senior Management Team are aware of this risk and taking it into
account in considerations for vacancies. This needs to be considered when fixed term contracts and secondments are
planned, consideration needs to be given to the whole of HSCM and not services in isolation. Many of our staff may have
transferrable skills and experience. 
The continuing system issues and lack of available beds may mean operations cannot be scheduled to reduce the backlog
and key staff may not have the necessary time in surgery to maintain essential skills.  This in turn may add to the staff
retention issues within certain specialties. 
4
Description of
Risk: 
Reputation:
Inability to demonstrate effective governance and effective communication and engagement with stakeholders. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high MEDIUM
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Performance framework to be further developed from a planning perspective to show the links through operational
service delivery to strategic objectives. 
Feedback from community representatives and third sector organisations, across a variety of forums, highlighted
issues. Clear focus and communications is required to ensure engagement and outcome needs are met. 
Rationale for Risk
Appetite:
The Board is aware of the importance of good relationships with stakeholders. It recognises many of our ambitions require
effective collaboration, co-production and partnership working with a range of stakeholders. The board also recognises
that not all partners will be able to move at the same pace, all the time. 
We will seek to protect relationships and will not set out to antagonise stakeholders deliberately. For exampleWe will not
be seen to exclude or prevent participation in the design of services where there is an appetite to do this.   
Page 62

Page 63

Appendix 1 
We are aware of the need to protect and maintain good working relationships with all partners and stakeholders in order
to deliver the outcomes set out in our strategic plan.
We must be mindful that repairing relationships is easier when there is already a well of goodwill to draw on, and that
further damage to an already damaged relationship will not be conducive to good long term outcomes. 
Controls: Governance Framework approved by IJB January 2021
Communication and Engagement Strategy approved November 2019
Annual Governance statement produced as part of the Annual Accounts 2021/22 and submitted to External Audit. The
unaudited accounts and governance statement for 2022/23 were presented to MIJB June 2023 and the audited accounts
will return to committee in September 2023 for agreement.
Annual Performance Report for 2022/23 was published in July 2023.
Performance reporting mechanisms in place and being further developed through performance support team, home first
group and system leadership team.
Community engagement in place for key projects areas such as Forres, Keith and Lossiemouth with information being
made available to stakeholders and the wider public via HSCM website.
Participation of stakeholders in a variety of meetings such as Home First project, carer strategy, Strategic, Planning and
Commissioning groups.
Mitigating
Actions: 
Schedule of Committee meetings and development days in place and implemented. 
New relationships are currently being established with Grant Thornton, the MIJB’s newly appointed external auditor for
2022/23. Good working relationship established with Audit Scotland, the MIJB’s appointed external auditors since
2016/17.
Discussions at leadership meetings to ensure all standards are being met around Public Sector Equality Duty and
published where appropriate. There is a new programme of training to ensure all policies are Equalities Impact Assessed
and the findings are published. The SMT are currently considering how any proposed service changes consider the PSED
as part of the consultation process. The principles of the Equalities Impact Assessment are now embedded in the
business as usual processes within Health and Social Care Moray. 
Social media is actively used as a method of engaging with the public, with short videos focussing on particular
services being trialled. 
SMT have considered the existing arrangements for engagement with stakeholders and work is being undertaken to
align our framework with the Scottish Government “Planning with people guidance” and ensure that mechanisms are in
place across services to evidence and evaluate their impact. A Public Engagement Communications Officer has now
been appointed and started in post mid August 2023.
Page 63

Page 64

Appendix 1 
Assurances: Oversight and scrutiny by Clinical and Care Governance Committee, Audit Performance and Risk Committee and
MIJB.  
Summary reports of minutes of MIJB meetings are submitted to Council committee and NHS Board.
Gaps in
assurance:
Progress on implementation of the Communication and Engagement Strategy was impacted by the Covid 19.  Due to
the impact of COVID and requirement for social distancing the normal mechanism for engagement were not all
available.  More use is being made of social media and Microsoft teams and other options and methods for
engagement with staff are being used via NHSG such as videos on YouTube and one question surveys. 
Going forward there may be more opportunity for face to face meetings to take place again but it should be considered
that this will not be beneficial for all. 
Current
performance:
Communication, Engagement & Participation Framework was reviewed approved by IJB November 2019. This will be
reviewed by the new Public Engagement and Communication Officer. 
The Unaudited Accounts for 2022/23 were approved in March 2023, presented to MIJB and APR Committee in June
2023 and are now being audited, with the audited accounts to be presented in September 2023. The Annual
Performance Report for 2022/23 was published in July 2023 after being presented to MIJB in June 2023. 
Comments: A communication cell is now established as part of the Local Resilience Partnership Covid and storms response with
representation from Emergency Services, Councils, HSCP and NHSG.  This was led by Aberdeen City Council and
was an example of the collaborative working that took place.  This forum provides assurance that messages to all
stakeholders are consistent.   
There has been representation from the Home first project at the Wellbeing forum to facilitate sharing of information
and seeking views. 
Page 64

Page 65

Appendix 1 
5
Description of
Risk: 
Environmental:
Inability to cope with unforeseen external emergencies or incidents as a result of inadequate emergency and resilience
planning. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
As a result of the Covid 19 response, progress was made in a number of areas.  SMOC information is updated, control
room guidance updated and expanded, control centre protocols were implemented and remain in place and management
teams have responded in an agile, responsive and collaborative way under very challenging conditions. 
Teams continue to do their best but there are areas where they still feeling overwhelmed and service delivery is
challenging. 
With effect from March 2021 MIJB is defined as a Category 1 responder under the Civil Contingencies (Scotland) Act
and there are additional requirements for preparedness that is being taken forward in partnership with NHSG and Moray
Council emergency planners.
Rationale for Risk
Appetite:
The MIJB understand the requirement to meet the statutory obligations set out within the Civil Contingencies Act and
the Category 1 status applied in March 2021, and work with partner organisations to meet these obligations.
Controls: Winter Preparedness Plan was updated (but not tested as in previous years) alongside NHSG plans as NHSG
implemented their crisis management framework which required participation of partners at Daily System Connect
meetings to discuss and prioritise resource to address issues with system flow.
HSCM Civil Contingencies group established and meeting regularly to address priority subjects.
NHS Grampian Resilience Standards Action Plan approved (3 year).
Business Continuity Plans are now updated for most services and this review continues across HSCM.
Knowledge of critical functions and ability to respond quickly and effectively has been in evidence during incidents such
as Gas outages in Keith (January and February 2021) and Covid response, Storms (Arwen, Malik and Corrie) – debriefs
carried out and learning identified.
A Resilience Newsletter started in December 2022 to ensure all staff receive some personal resilience information
together with resources for teams to plan.
Regular updates to SMT and SLG regarding potential power outages across the country. Additional sessions delivered
to Primary Care Contractors to assist with their Business Continuity Planning around power outages.
Regular system wide meetings to discuss potential Industrial Action implications and service planning. 
Page 65

Page 66

Appendix 1 
A review of the Festive season arrangements was completed and as a result all services are now required to provide
information about service cover available over holiday long weekends which enables a more  collaborative and supportive
approach. 
Mitigating
Actions: 
Information from the updated BIA/BCP informed elements of the Winter Preparedness Plan 
Daily Response Group continues, this allows the status of services across the whole system to provide information and
contact details to the Senior Manager on Call (SMOC) over the weekend. If any potential issues are highlighted the
relevant Persons at Risk Data is compiled and if appropriate, shared with relevant personnel. 
NHSG have introduced system wide daily huddles to manage the flow and allocation of resources which require
attendance from Dr Grays and HSCM. The format and regularity of these are under review. 
Practitioner group established for Moray with representation from HSCM, Dr Grays, Moray Council and NHSG to
discuss matters arising from the Local Resilience Forum and within our respective organisations.  In addition it will
provide a forum for discussion of the linkages between organisational response plans to ensure there are no gaps or
over reliance on particular local resources. 
HSCM continues to monitor the local situation regarding impacts on staffing and is engaged with NHSG emergency
planning arrangements and Council Response and Recovery management team to be ready to escalate response if
required. Work was undertaken within NHSG, Aberdeenshire HSCP and Aberdeen City HSCP to look at Surge flows
and establish a mechanism that will provide easy identification of “hot spots” across the whole system in Grampian, to
facilitate a collaborative approach to addressing the issues through the use of a common Operational Pressure
Escalation approach.  This work could underpin surge responses in winter and at other times of pressure and having a
standard approach across Grampian could aid communication and understanding. 
NHSG and the three Health and Social Care Partnerships completed a considerable amount of planning for potential
Industrial Action from staff groups. This has allowed for testing of a range of communications and plans to be tested
and will continue to develop. 
Assurances: Audit, Performance and Risk Committee and NHS Grampian Civil Contingencies Group oversight and scrutiny.
HSCM Civil Contingencies group review specific risks and action plans to mitigate, developing plans and testing
arrangements in partnership with NHSG and Council
Gaps in
assurance:
Moray Integrated Joint Board (MIJB) was designated as a Category 1 responder under the Civil Contingencies Act 2004
from March 18th 2021. That designation imposed a number of statutory duties in terms of the Act and the associated
Page 66

Page 67

Appendix 1 
Scottish Regulations1.  MIJB has no dedicated, specialist in post and is reliant on the Corporate Manager covering this
increasingly demanding role in addition to other duties without the necessary background, knowledge, skills and
experience. This presents a potential organisational risk in terms of compliance, and our ability to provide assurance on
discharging our civil contingency arrangements. This has been highlighted to the Chief Officer and IJB. 
The debriefs from the storms in 2021/22 have identified lessons learnt for Grampian Local Resilience Partnership and
more locally for the response co-ordination within Moray.    Action were developed in collaboration with Moray Council’s
emergency planning officer to address the issues identified.  The main issues related to developing wider awareness of
roles and responsibilities,   and improving general awareness of response structures and meeting protocols.  This will be
incorporated into training schedules going forward.  It has also highlighted the need for a robust arrangement for out of
hours contact and clarity of roles and responsibilities across the system which is being discussed at SMT. Option
Appraisal discussions have commenced. 
Progress has been made however further work is required to address the targets in the implementation plan that have
not been met and the Resilience standards as identified by the NHSG Civil Contingencies Group. 
The ‘Care for People’ strategic document has been approved by HSCM SMT and CMT. It will be presented to MIJB in
September. A draft operational response plan has been drawn up and has been circulated within the Senior Leadership
Group for comment. An information session including the ‘Care for People’ element was delivered on 2 May 2023, to
senior managers who carry out the role of SMoC, this included input from Moray Council Emergency Planning Officer
and NHS Grampian. An additional session with a specific focus on the draft Care for People framework has been arranged
for September 2023. 
The intention is to hold a table top exercise with managers from HSCM and Moray Council to test the invocation
arrangements to ensure common understanding of roles and responsibilities.
Table top style exercises were carried out with some services who had submitted their finalised Business Continuity plans
in February 2023. 
Development of a HSCM Persons at Risk Database continues and all partners are now involved, looking to improve the
quality of the data held. HSCM is also working with Aberdeen City, Aberdeenshire and NHS Grampian at a system wide
approach. 
Current
performance:
The Senior Management Team have undertaken ‘Strategic Leadership in a Crisis’ training since 2020 and continue to
do so as the programme is delivered. 
1 Civil Contingencies Act 2004 (Contingency Planning) (Scotland) Regulations 2005
Page 67

Page 68

Appendix 1 
Many services have business continuity arrangements and some are overdue for an update.  Work has progressed in
identification of a critical functions list for agreement by System Leadership Group that will inform planning
arrangements going forward.  There will need to be changes made to business continuity plans following the
implementation of additional ICT resources in services which have provided a greater deal of resilience for some
services and functions – albeit reliant on electricity supply.  A schedule of review and exercising of business impact
assessments and plans has been scheduled for this year across services. All services have been requested to prioritise
their Business Continuity planning with a particular lens on power outages. 
Annual report on progress against NHS resilience standards was presented to the APR committee on 30 March 2023. 
Report on the implications and risks of the designation as a Category 1 responder was presented to MIJB 25 November
2021. 
Work is currently underway to plan for possible National Power Outages across the UK. This is being co-ordinated
across Grampian to ensure all Partners are involved. Information/planning sessions were also delivered via HSCM to 
our Primary Care partners. They were invited to share emergency plans with the partnership. 
Comments: The requirements of a Category 1 Responder continue to increase in demand placing increased pressures across
already overstretched services and managers. The Manchester Arena Inquiry has resulted in a focus on Category 1
responders responsibilities, together with an increase of additional policies and procedures to be written and
implemented with no additional resource. MIJB does not have a subject matter expert leading on these topics. 
Recently NHS Grampian identified that 54 buildings/areas within their estate may potentially have Reinforced
Autoclaved Aerated Concrete (RAAC) within the structure. This is a lightweight form of concrete used mainly in roof,
floor and wall construction in the UK from mid 1950s to mid 1990s. It has proven not to be as durable as other concrete
building materials and there is a risk it can fail. NHS Grampian are leading a project to identify the areas and put plans
in place. Currently 5 buildings within HSCM have been identified, and NHS Grampian will be working with them to carry
out surveys in the first instance.  
Page 68

Page 69

Appendix 1 
6
Description of
Risk: 
Regulatory
Risk to MIJB decisions resulting in litigation/judicial review.  Expectations from external inspections are not met.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high MEDIUM
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Considered medium risk due to the impact of Covid-19 and resultant efforts required to remobilise services and/or the
increase in workloads stretching a workforce that has been under sustained pressure for a considerable time. 
The ongoing impact of the Covid 19 pandemic is stretching resources to deliver care in the community across all
providers (internal and external) so there is a potential increased risk of expected standards not being achieved despite
the best efforts of all concerned.     
Rationale for Risk
Appetite: 
The Board, staff and providers across Moray are all committed to ensuring high standards of clinical care & governance
through operational policies.  Innovation and new ways of working may mean traditional regulations do not exist and
require to be developed, no longer apply, or are contradictory. 
We will only take regulatory risks knowingly, following consultation with the relevant regulatory body and where we have
clear risk mitigation in place. 
Controls: Clinical and Care Governance (CCG) Committee established and future reporting requirements identified
Clinical Risk Management and Practice Governance group has oversight of their respective professional standards and
also links into Clinical and Care Governance Group, which escalates to CCG Committee as necessary.
High and Very High operational risks are reviewed by NHS Grampian Clinical Risk Management and System Leadership
Group monthly and a review of all risks will be undertaken as part of the risk management framework.
Workshops took place in January and February 2023, ‘A conversation about Clinical Governance’. Additional operational
workshops will continue in 2023. 
Complaints and compliments procedures in place and monitored.   
Clinical incidents and risks are being reviewed on a fortnightly basis to ensure processes are followed appropriately and
consistently and responses are recorded in a timely manner.
Adverse events and duty of candour procedures in place and being actioned where appropriate and summary reports
submitted to CCG committee.
Page 69

Page 70

Appendix 1 
Reports from external inspections reported to appropriate operational groups and by exception to SMT for subsequent
reporting to CCG or Audit Performance and Risk Committee as appropriate. albeit there was a reduction in some areas
of external inspection reporting during the Covid period due to social distancing restrictions. It is anticipated that these
will begin to increase over the coming year. 
Care Home Oversight Collaborative Support Group meets to oversee and manage risks in care homes.
Children and Adult Protection services are being delivered and reported to their respective committee on a regular basis.
Mitigating
Actions: 
This risk is discussed regularly by the three North East Chief Officers. 
Additional resource has been allocated to support the analysis of information for presentation to CCG committee
All High and Very High risks are now brought before the Senior Leadership Group in Moray. 
Process for sign off and monitoring actions arising from Internal and External audits has been agreed
Assurances: Audit, Performance and Risk and Clinical and Care Governance Sub-Committees oversight and scrutiny.
Governance Framework in place and operational. This is currently being refreshed and will be presented to the CCGG
Committee in November 2023. 
Gaps in
assurance:
Process for highlighting recurring themes or strategic expectations from external inspections requires further development
to ensure Committee has sight of significant issues. 
Current
performance:
External inspection reports are reviewed and actions arising are allocated to officers for taking forward. 
Two Days of Care Survey took place across Moray on 25th and 26th January, 2023 respectively. These were led by the
Clinical Service Leads.  The findings of these events were compiled and outcomes are assessed by the relevant
service leads and SMT. A further round of audits on Social Care will now be completed and a full report will be
considered if necessary, dependant on outcomes. 
A summary of inspections is included in the Annual Performance report.   
The level is marked as an increasing risk on the basis that services are under pressure with the issues with staffing
capacity and the need to focus on delivery of critical functions which may mean external inspection are not the priority
at this moment in time. 
The Adult Support Protection inspection took place in April/May and an action plan has been developed and is now in
place.
Comments: No major concerns have been identified for HSCM services in any audits or inspections during 2021/22.
An inspection of Childrens Services commenced in August 2023, this will take place over a number of months.
Page 70

Page 71

Appendix 1 
7
Description of
Risk: 
Operational
Continuity and
Performance:
Inability to achieve progress in relation to national Health and Wellbeing Outcomes.   
Performance of services falls below acceptable level.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Potential impacts to the wide range of services in NHS Grampian and Moray Council commissioned by the MIJB arising
from reductions in available staff resources as budgetary constraints impact. 
Unplanned admissions and delayed discharges place additional cost and capacity burdens on the service.   
The level of delayed discharges has remained high challenging, reflecting the sustained pressure in the system
following the Covid -19 pandemic impact and the lack of availability of care in the community.  There are sustained
focussed and collective efforts by all those working in the pathway.  However this is a complex area and will require
continued effort to realise reductions and maintain them.   
Rationale for Risk
Appetite: 
The Board is cautious but open about risks that could affect outcomes that are priorities for people in Moray. There is a
slightly higher appetite to risks that may mean nationally set outcomes – that by design are not given a high priority in
Moray - are not met. There is new focus on addressing positive risk taking to ensure the most appropriate and timely
measure of care for the population of Moray, this is being supported through various work streams across the system. 
This will only be accepted where there is a clear rationale, and preferably also a way of demonstrating what the IJB is
doing to meet the aspiration the outcome was created for. 
Controls: Performance Management reporting framework. 
2022 to 2032 “Partners in Care” Strategic Plan was approved and development of delivery plan is underway.
Performance is regularly reported to MIJB. Revised Scorecard being developed to align to the new strategic priorities.
Best practice elements from each body brought together to mitigate risks to MIJB’s objectives and outcomes.
Chief Officer and SMT managing workload pressures as part of budget process.
A daily Huddle and write up circulates the picture on performance across community and acute services for the
Portfolio and  service managers have a shared understanding of the pressures in the system and mitigations taking
Page 71

Page 72

Appendix 1 
place.  Work continues on  refinement of G-OPES (Grampian Operating Pressures and Escalation System) led by
NHSG but being developed locally to identify the triggers and resultant actions required in services to respond to
pressure points.
Mitigating
Actions: 
Service managers monitor performance regularly with their teams and escalate any issues to the System Leadership
Group (SLG) for further discussion to provide wider support, developing shared ownership and a greater understanding
across the whole system.   
Key operational performance data is collated and circulated daily to all managers.  A  Daily dashboard is held on
illuminate for managers to access to ensure any potential issues are identified quickly so action can be taken.  This
dashboard is being reviewed and will be further developed with the intention of further dashboards to provide a whole
system overview.  This has been discussed at SLG and agreed. 
Performance information is presented to the Performance sub group of Practice Governance Group to inform Social
Care managers of the trends in service demands so that resources can be allocated appropriately. 
Assurances: Audit, Performance and Risk Committee oversight. 
Operationally managed by service managers, summary reports to Practice Governance and clinical and care
governance group and to System Leadership Group.  Strategic direction provided by Senior Management Team. 
HSCM Response Group continues to meet and reviews the key performance information and actions that are required
to deliver the priority services.
Gaps in
assurance:
Development work in performance to establish clear links to describe the changes proposed by actions identified in the
Strategic Plan has recommenced but is at an early stage.  This will be progressed as the revised outcomes are
determined and associated KPI are identified.  Progress will be reported to future Board meetings.
Review of systems and processes will commence across HSCM to ensure they are fit for purpose and ensure that
there are no indirect consequences of structure changes resulting in any gaps in assurance processes. 
Current
performance:
Services continue to recover from the pandemic and discover a new ‘battle rhythm’, taking into account all new learning
and experience from the pandemic..
There are likely to be changes to ways of working and this may also have impact on the performance information
required. The Unmet need report continues to show improvement in a number of Performance Indicators, with a
number of them now showing continued improvement over the longer-term. 
Comments: Locality profile information has been provided to Locality Steering Group/Locality Manager to inform potential priorities
for consideration in Localities and work will be taken forward regarding development of performance monitoring and
reporting of key performance indicators in relation to Localities once it has been determined what the intended
outcomes are.  Locality plans are now scheduled to report to MIJB on a quarterly basis.
Page 72

Page 73

Appendix 1 
The delayed discharge Portfolio Flow Group has produced an action plan for implementation and progress is being
made.  
Practice Governance have reviewed their operational performance requirements and have a comprehensive data set
used to inform operational priorities.
The Home First priorities are being taken forward and updates are reported to this committee or MIJB on a regular
basis. This work is being undertaken across the Moray Portfolio to improve wider system flow.
Progress in this area has been hampered due to the increased demand for urgent or critical services requiring staff
resource to be prioritised to frontline service delivery. 
The Council has procured new modules for their performance reporting system Pentana and HSCM performance team
have been developing its use for reporting.
HSCM are working in partnership with the Rural Centre of Excellence on transformation projects, the foundation of
planning is addressing how we can improve the delivery of health and wellbeing outcomes and also the strategic aims
of ‘Partners in Care’. 
Page 73

Page 74

Appendix 1 
8
Description of
Risk: 
Transformation
Inability to progress with delivery of Strategic Objectives and Transformation projects. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
There are many issues that will impact on the ability to progress to deliver Strategic Objectives. 
The Strategic Planning & Commissioning group has been refreshed and re-launched and key work is being progressed. 
There was an initial meeting held on 22 September 2021 to consider terms of reference and the proposed structure for
oversight, prioritisation and assurance in relation to key developments, their fit with IJB strategy and enabling elements. 
The interim appointment of the Strategic and Planning Lead provides capacity to take this forward and to align the
priorities arising nationally, Grampian-wide and locally. 
The remobilisation plan for HSCM services that were suspended or reduced is progressing with Providers services and
social work implementing the IJB decision to return to delivery of both substantial and critical eligibility criteria.  Work has
progressed risk assessments are completed and assessments have been or are in the process of being reviewed to
ensure equality.   
The impact of Covid 19 on the population of Moray is still not fully realised.  It is therefore not possible to predict the
extent of the impact on the ability to progress with delivery of Strategic Objectives.  There are some aspects that have
progressed very well such as introduction of Near Me consultations but there are others that are more difficult to progress. 
There is concern that due to the workloads and challenges over the last year that teams are weary and/or do not have
capacity at this moment in time, to progress with delivery of development plans at this moment in time.  In addition the
pandemic is still present in the community so services are still responding to the impacts it has for the population of
Moray.  Managers are working with teams to establish “readiness” and their capacity and sense of wellbeing and the
collated output will inform plans going forward. 
One key aspect to facilitate transformation is the need for progress in relation to ICT infrastructure, data sharing and data
security across the whole system.   Work was undertaken by NHS Grampian and partners to address the needs for ICT
kit and information during the response to Covid. 
Page 74

Page 75

Appendix 1 
Rationale for Risk
Appetite:
The Board has a high appetite for risks associated with delivery of transformational redesign. The following should be
considered when accepting these risks:
• We understand and can mitigate other risk types that may arise, e.g. safety or financial within appetite 
• Service users are consulted and informed of changes in an open & transparent way 
• We will monitor the outcome and change course if necessary   
Controls: It is recognised that there will be significant changes taking place in Social Work practice with the implementation of the
Self Directed Support standards and the move to outcomes based services, so governance arrangements are being set
up to facilitate the same type of oversight and communication that is in place for the Home First programme.
The Strategic Delivery Plan is being developed by the Heads of Service and Interim Stratgegic Planning Lead. 
Mitigating
Actions: 
Integrated Infrastructure Group previously established, with ICT representation from NHSG and Moray Council, to
consider and provide solutions to data sharing issues and ICT infrastructure matters which is an area that will be taken
forward alongside the Moray Growth Deal projects.  The Moray Transformation Board has recently restarted and will
link to all relevant groups. 
Assurances: Strict ICT and data sharing policies and protocols in place with NHS Grampian and Moray Council.
A Moray Portfolio Infrastructure Programme Board has been established to support the operational delivery of the aims
and objectives set e.g. Analogue to Digital changeover, Buildings and Assets oversight and Smarter Working will
support this agenda. 
Gaps in
assurance:
Transformation/implementation planning is in development and will inform outcomes and performance reporting on the
delivery of the strategic plan.
Protocol for access to systems by employees of partner bodies are in place.
Information Management arrangements to be developed and endorsed by MIJB.
Process of identification of issue and submission to data sharing group requires to be reinforced to ensure matters are
progressed.
The strict information sharing protocols can cause issues when trying to work across system in an open and
transparent way.
Smarter Working programmes are being progressed in partnership with Council and NHSG.
Current
performance:
Training to promote records management, data protection and related issues for staff working across and between
partners using the learning and development resources of NHS Grampian and Moray Council. 
Comments: Where national systems are involved it may not be possible to identify a solution however the issues will be able to be
raised at the appropriate level via the Grampian Data Sharing Group where all three partnerships are represented. 
Page 75

Page 76

Appendix 1 
9
Description of
Risk: 
Infrastructure
Requirements for support services are not prioritised by NHS Grampian and Moray Council.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Changes to processes and necessary stakeholder buy-in still bedding in. 
Moray Council is undertaking a Property review of office and depot accommodation and the potential impact for HSCM
services requires consideration.  The output was anticipated in October 2019 however due to changes with roles and
responsibilities within the Council however the paper has been out for consultation. NHSG have advised that staff should
continue to work from home at present whilst policies and protocols are developed.  Moray Council have a dedicated MC
officer leading on a hybrid working plan with input from HSCM on their requirements. It is anticipated that this will conclude
December 2023. 
ICT infrastructure service plans in NHS Grampian and Moray Council are not yet visible to HSCM and development of
communication and engagement process is required. 
The impact of Covid has resulted in a change in ICT strategy for Moray Council.  Council employed staff requiring mobile
technology have now been provided with it and some staff are still working from home.
Rationale for Risk
Appetite: 
Low tolerance in relation to not meeting requirements.
Controls: Chief Officer has regular meetings with partners. 
Computer Use Policies and HR policies in place for NHS and Moray Council and staff. 
PSN accreditation secured by Moray Council 
Infrastructure Programme Board was established with Chief Officer as Senior Responsible Officer/Chief Officer
member of CMT. Process for submission of projects to the infrastructure board approved and implemented to ensure
appropriate oversight of all projects underway in HSCM.  The Board has only recently restarted, so in the interim,
project requests are being processed via Senior Management Team. The interim Strategy and Planning Lead will
support the Infrastructure Programme Board for Moray portfolio. 
Page 76

Page 77

Appendix 1 
Mitigating
Actions: 
Membership of the Board was reviewed and revised to ensure representation of all existing infrastructure processes and
funding opportunities.
Process for ensuring infrastructure change/investment requests developed 
Assurances: Infrastructure Programme Board functions to provide robust governance and assurance that proposed projects have a
robust business case and meets requirements of the respective partner organisations.  This board reports to Strategic
Planning and Commissioning Group.  Both of these groups have been recently refreshed and remobilised. 
Workforce Forum meeting regularly with representation of HR and unions from both partner organisations 
Gaps in
assurance:
Further work is required on developing the process for approval for projects so that they are progressed timeously.
Need to review all existing processes in relation to infrastructure changes/projects/investments and streamline to avoid
duplication of effort. 
Infrastructure Board is in development and priority issues are being addressed in relation to infrastructure and premises
risk. Due to staff changes this work will now be incorporated into other roles. This will likely mean that this work will
complete with other priorities of already busy roles. 
Legal services have reduced capacity to provide support due to budget cuts and vacancies so any requests may take
longer. 
Internal Audit Services have indicated that their capacity to complete all work required by MIJB may be an issue. This is
being discussed with Moray Council. 
Recruitment for vacancies takes considerable time due to various factors and is presenting a strain on services to maintain
normal service whilst covering vacancies.  There have been several posts that have had to go out to advert more than
once extending the time other staff are covering gaps. 
Current
performance:
No update.
Comments: Existing projects will be reviewed as part of the development of the transformation plans for the Strategic Plan to
ensure resources are being dedicated appropriately and aligned to the emerging Strategic priorities.  Our requirements
for support will be communicated via appropriate channels 
Page 77

Page 78

Page 78

Page 79

REPORT TO:  MORAY INTEGRATION JOINT BOARD AUDIT,
PERFORMANCE AND RISK COMMITTEE ON 31 AUGUST
2023 
SUBJECT:  UPDATE ON IMPROVEMENT PLAN FOR ADULT SOCIAL
CARE COMMISSIONING 
BY:    HEAD OF SERVICE/CHIEF SOCIAL WORK OFFICER 
1. REASON FOR REPORT 
1.1. To update the Committee of progress regarding the improvement plan for Adult
Social Care Commissioning in line with the external review conducted by
KPMG, finalised in February 2023, since the last Committee meeting on 29
June 2023. 
2. RECOMMENDATION 
2.1. It is recommended that the Committee considers and notes: 
i) the actions within this report; and 
ii) that further updates will be provided at the next Committee meeting,
along with an updated Improvement Plan. 
3. BACKGROUND 
3.1. The Committee received an update regarding progress using the Improvement
Plan at Committee on 29 June 2023 (para 11 of the minute refers).  This report
is a quarterly update as agreed at Committee on 30 March 2023 (para 11 of the
minute refers). 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1. The Governance around Commissioning activities has been further established
with the reintroduction of the monthly Managers Commissioning Meeting. 
Aligning the Terms of Reference for this meeting to the escalation route of
Practice Governance Board has been completed in draft.  This will go through
the consultation and approval process in September 2023. 
Item 9.
Page 79

Page 80

4.2. The Commissioning Team are knowledgeable on national context regarding the
approach to commissioning across the social care sector.  The direction of
travel is discussed at the Social Work Scotland Contract and Commissioning
Sub group, at which Health and Social Care Moray are represented.  This has
supported the production of an awareness presentation regarding Ethical
Commissioning that outlines the importance of co-production and co-design. 
This will be rolled out to colleagues and stakeholders and embedded in
commissioning activities.   
4.3. The Contract Record Document that evidences the commissioning cycle has
been followed and clear decision making has been approved by the Service
Manager with responsibility for Commissioning in Health and Social Care
Moray.  In order to embed continuous improvement within the commissioning
team, this approach is due for review at the end of September 2023 so that
management can be certain that it is fit for purpose and therefore it is being
piloted using the Carers Contract. 
4.4. The progression of bringing out of date contracts into date is steady.  It is
important that this is done following the principles of commissioning and within
procurement legislation.  To date this year there have been 6 contracts
awarded and a further 2 contracts are with the provider for signature, one letter
of extension has been agreed within the terms of the contract and a further 15
contracts are in various stages of the commissioning and procurement cycle. 
4.5. In order to ensure that the commissioning work keeps momentum, an annual
work plan needs to be produced with priority contracts agreed with
Management.  This will be included in the presentation offered to colleagues so
that assurance is provided regarding the recommissioning of services.  This
does not take into account new pieces of work identified by gaps in the market. 
In order to prioritise these, a referral form has been created so that the
commissioning team can allocate work appropriately. 
4.6. The invoicing authorisation process remains in place and managers are
authorising within the correct remit.  Invoices are now aligned to contract
numbers as well as providers so that greater clarity is provided to the authoriser
regarding where the invoice pertains to.  To strengthen assurance and
understanding, a follow up workshop is being organised with Managers to
progress this further so that authorisation training can be provided. 
Documentation is now retained in order to minimise the risk of future payment
errors, e.g. variances in billed care time. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”                   
In order to fulfil the MIJB strategic aims, it is essential that services are                   
operating with optimum efficiency to ensure the needs of the Moray                   
population can be met, that services are fit for purpose and that
processes and accountability is clear. 
(b) Policy and Legal        
The CSWO/Head of Service must ensure that services delegated by her
Page 80

Page 81

work within the legal and policy framework related to commissioning and        
delivery of services. 
(c) Financial implications         
There are no financial implications arising from this report. 
(d) Risk Implications and Mitigation
The Improvement Plan implements robust systems and processes in
response to the KPMG reports and findings. Regular monitoring and
reviewing of the Improvement Plan takes place to ensure actions are
progressed. It is noted that the current resource of the team may mean
that timescales and outcomes could be delayed. However any risk or
emerging risk will be escalated to Committee as part of the regular
reporting schedule. 
(e) Staffing Implications         
There are no staffing implications. 
(f) Property        
There are no property implications 
(g) Equalities/Socio Economic Impact
This report does not require an Equality Impact Assessment as there is
no change to policy. 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report. 
(i) Directions
None arising directly from this report. 
(j) Consultations
Commissioning team and Social Work Service Manager. 
6. CONCLUSION 
6.1 The committee is requested to note this report and agree to receive an
updated improvement plan at the next Committee Meeting. 
Author of Report: Aimee Borzoni, Senior Commissioning Officer 
Background Papers:  
Ref: 
Page 81

Page 82

Page 82

Page 83

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 31 AUGUST 2023 
SUBJECT: INTERNAL AUDIT SECTION COMPLETED PROJECTS REPORT 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 To provide an update on audit work completed since the last meeting of the
Committee.   
2. RECOMMENDATION 
2.1 The Audit, Performance and Risk Committee is asked to consider and
note this audit update. 
3.  BACKGROUND   
3.1 Public Sector Internal Audit Standards (PSIAS) require the Chief Internal
Auditor to prepare and present reports to the committee on internal audit’s
activity relative to the audit plan and any other relevant matters. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1     In line with the approved internal audit plan, the following reviews were
completed: 
Disabled Parking System 
4.2 A review of the Disabled Parking Permit Scheme has been completed.
Disabled parking permits, also known as blue badges, help people with
disabilities or health conditions park closer to their destination. Local
authorities are responsible for the day-to-day administration and enforcement
of the scheme. However, the framework for the scheme is set by Transport
Scotland. The audit reviewed systems and procedures in administering the
Disabled Parking Permit Scheme. This included the processes for
assessment, management and investigation of blue badge misuse. The
executive summary and recommendations for this project are given
in Appendix 1.  
Item 10.
Page 83

Page 84

5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Partners in
Care 2022 – 2032”
Internal audit work supports good governance and assists in securing
appropriate systems of internal control. 
(b)  Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications and Mitigation
Audit reports highlight risk implications and contain recommendations for
management to address as a means of mitigating.   
(e) Staffing Implications
No implications directly arising from this report 
(f)   Property
No implications. 
(g)  Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions 
None arising directly from this report. 
(j) Consultations
There have been no direct consultations during the preparation of this
report. 
6. CONCLUSION 
6.1 This report provides Committee with a summary of findings arising from
audit project completed during the review period. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor 
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/31082023 
Page 84

Page 85

Appendix 1 
AUDIT REPORT 24'010
DISABLED PARKING PERMIT SCHEME 
Executive Summary 
The annual audit plan for 2023/24 provides for an audit review of the arrangements
for managing the Disabled Parking Permit Scheme. Disabled parking permits, also
known as blue badges, allow eligible people to park close to amenities they would
otherwise have difficulty accessing. Local authorities are responsible for the day-to-
day administration and enforcement of the scheme. However, the framework for the
scheme is set by Transport Scotland, in addition to providing support to assist in
consistent operating practices across all local authorities. A blue badge is subject to a
charge of £20 and can be valid for up to three years. 
The scope of this audit was to review systems and procedures in the administration of
the Disabled Parking Permit Scheme. This included the processes for assessment,
management and investigation of blue badge misuse. The expenditure for providing
the service relates mainly to staffing and the cost of producing badges from approved
suppliers. The Council issues approximately 1700 blue badges annually with an
income of £29,000 collected in 2022/23. 
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS). 
The key areas identified for management attention include the following:- 
• The Moray Council Financial Regulations detail that invoices must be raised
within one month of providing goods or services. Once a blue badge is issued,
an invoice of £20 should be issued to the applicant. Audit testing found that the
Service did not raise invoices until several months after issuing the blue badge.
It was noted that over recent years there have been significant increases in the
number of applications received for blue badges, but staffing levels have
remained unchanged. However, to ensure effective income collection
arrangements and compliance with the Council’s Financial Regulations,
invoices should be raised promptly once the blue badge has been issued.     
• Analysis of the Financial Management System noted a shortfall of
approximately £24,000 in the income received compared to the blue badges
issued. Further investigation noted that there were approximately 1200 blue
badges provided to applicants in 2020 and 2021, where no invoices had been
issued. Explanation sought as to why no invoices had been raised revealed this
was due to workload issues and the extraordinary challenges faced by the
Service during the pandemic. Invoices should be raised for these blue badges
issued in 2020 and 2021 as a matter of urgency.   
Item 10.
Page 85

Page 86

Appendix 1 
• Audit testing noted that the Service is following Transport Scotland Guidelines
in assessing eligibility and managing the Disabled Parking Permits Scheme.
However, it was found that the Blue Badge Scheme Policy was last updated in
2013. Policies and procedures should be updated to reflect current operating
practices and legislation. 
The Internal Audit Section provides Management with an opinion on the internal
control environment and also categories risk ratings for recommendations as high,
medium or low. The audit recommendations for this review have been classified as
follows: 
Risk Ratings for Recommendations
High Medium Low
Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Less critically important controls
absent, not being operated as
designed or could be improved. 
Lower level controls absent, not
being operated as designed or
could be improved. 
2 2 1 
.
Page 86

Page 87

Appendix 1 
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Effective management controls operate to ensure the delivery of the Disabled Parking Permit System is in accordance
with Transport Scotland Guidelines. 
5.01 The Blue Badge Scheme Policy
should be reviewed and
updated. This should include
reference to responsibility for
investigating misuse and
arrangements if required to
cancel a service users blue
badge. 
Medium Yes The Blue Badge
Scheme Policy
will be updated
to ensure all
aspects of the
service and its
processes are
incorporated,
including badge
misuse
arrangements.
Interim
Community
Care Finance
Officer/Support
Manager 
31/03/2024
5.02 All service users identified that
have received a blue badge in
2020 a 2021 but not billed should
be invoiced as a matter of
priority. 
High Yes Work is
underway to
review un-
invoiced
applications
from 2020 and
2021 to establish
the current
position. On
Commissioning
Manager
31/01/2024
Page 87

Page 88

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
completion of
this review,
invoices will be
raised for all
outstanding
approved blue
badges issued
from this period.
5.03 In accordance with Financial
Regulations, service users
should be invoiced within one
month of receiving a blue badge. 
An action plan should also be
agreed to resolve any backlog of
blue badges issued to applicants
who have yet to be invoiced. 
The audit review noted that the
fee for a blue badge is payable
on application in some Local
Medium 
Low
Yes 
Yes 
An action plan is
now in place to
clear the current
year invoice
backlog, staff
time has been
ring fenced to
facilitate this. All
new applications
are being
invoiced within
one month.  
Discussions are
currently
underway
between the
Interim
Community
Care Finance
Officer/Support
Manager 
Interim
Community
Care Finance
31/08/2023 
31/12/2023
Page 88

Page 89

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Authorities. Consideration
should be given to investigating
the option for an individual to pay
the charge for a blue badge on
completion of the application
form. 
Community
Care Finance
team, the
Payments team
and Senior
Management to
develop the
option of up-front
payment for blue
badges.
Officer/Support
Manager 
5.04 All sensitive personal data held
within the Community Care
Finance Office should be stored
securely with access restricted
to only authorised officers. 
High Yes There will be a
purchase of
lockable filing
cabinets to
replace those
which are non-
lockable and all
staff will attend
data protection
training and be
reminded of the
clear desk policy
with immediate
effect. The lock
on the door will
be used without
delay and 
Interim
Community
Care Finance
Officer/Support
Manager 
31/08/2023 
Page 89

Page 90

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
without
exception. 
Page 90

Page 91

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 31 AUGUST 2023 
SUBJECT: SELF-DIRECTED SUPPORT OPTION 1 AUDIT UPDATE 
BY:  SERVICE MANAGER, PROVIDER SERVICES 
1. REASON FOR REPORT 
1.1. To inform the Audit, Performance and Risk Committee in relation to the
progress of the current work being undertaken to achieve the recommendations
outlined in the most recent internal audit report regarding Self-Directed Support
(SDS) Option 1. 
2. RECOMMENDATION 
2.1. It is recommended that the Audit, Performance and Risk Committee
consider and note the current progress relating to the Self-Directed
Support Option 1 audit report. 
3. BACKGROUND 
3.1. The Social Care (Self-Directed Support) (Scotland) Act 2013 was enacted on 1
April 2014 with the Self-Directed Support (SDS) Standards being implemented
in March 2021.  The focus of both the legislation and the standards is to deliver
independent living, enabling people of all ages to have the same freedom,
dignity and control as other citizens at home, work and in the community. 
3.2. An internal audit was carried out through the lens of the financial reviews which
are required to be carried out for those opting to receive their care and support
via Option 1 of SDS (Direct Payments).  The audit delivered key
recommendations for the service to achieve. 
3.3. An update report was requested from the Audit, Performance and Risk
Committee on the issues found in the audit reports as presented by the Chief
Internal Auditor at the Committee Meeting held on the 29 June 2023 (item 8 of
the minute refers). 
Item 11.
Page 91

Page 92

4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1. The high level action plan was delivered alongside the audit report, which has
now been further developed into a more robust delivery plan to support in
meeting the recommendations. 
4.2. There is a requirement for 3 month, annual and closing reviews to be carried
out on all Direct Payment packages, in addition to supporting with the setting up
of Direct Payment packages (including recruitment, payroll, and insurance) and
on-going support to individuals for the duration of the Direct Payment. 
4.3. At the time of the audit, the team were supporting 150 Direct Payment
recipients, at the time of writing, the team are now supporting 273 packages,
consisting of 201 ongoing weekly payments, 30 SDS Carer one-off payments
and 42 supported person one-off payments in the previous 12 month period. 
4.4. The outstanding reviews have been heightened as a result of the COVID-19
pandemic, when the team had to reduce their delivery in line with the business
continuity plan and staff redeployed to other critical areas of the wider service. 
4.5. As can be evidenced through the delivery plan (Appendix 1), several actions
have now been completed and have been built into the ongoing operations of
the team, whilst others have been progressed.  The team are completing
financial reviews within the current resource available to the team, balancing
this against the need to deliver front line support to those opting to receive a
Direct Payment to ensure there is no delay in their care and support
commencing. 
4.6. Through the prioritisation of the financial reviews in line with the audit
recommendations, closing reviews have been prioritised alongside those with
unmanaged accounts.  Furthermore those reviews due at 3 months of a
package commencing, are prioritised to ensure individuals have got the
necessary documents in place and to support in ensuring funds are being used
to meet the agreed outcomes. 
4.7. For reassurance, within the current financial year, a total of £292,812.65 has
been reclaimed, of which £187,341.24 has been a result of carrying out closing
reviews as a result of the targeted prioritisation. 
4.8. To support the completion of the outstanding reviews, a 3 Minute Brief was
presented to the Senior Management Team for additional resource, where
approval was obtained for the advertisement of up to 4 temporary posts until
March 2024 to dedicate to the completion of the reviews.  The funding for the
posts has been utilised from a portion of the funds the team have reclaimed to
date in this financial year.  An evaluation of the posts will be carried out early
2024 to ensure future planning and mitigating actions are in place for future
delivery. 
Page 92

Page 93

5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
SDS supports the vision of the MIJB Strategic Plan, the Corporate Plan
and LOIP. The strategy will support Theme 2, Home First Objective 3,
we work together to give you the right care in the right place at the right
time. 
(b) Policy and Legal
Compliance with Social Care (Self-Directed Support) (Scotland) Act
2013, the accompanying statutory guidance and SDS Framework of
Standards.  The accompanying local Direct Payment policy and
guidance utilises the Charted Institute of Public Finance and
Accountancy (CIPFA) guidance relating to the monitoring of Direct
Payments. 
(c) Financial implications
There is a requirement for the reviews to be carried out in line with the
given timescales to ensure governance over the Direct Payments funds. 
The recruitment to the temporary posts has been utilised from funds
returned to Health & Social Care Moray, and will further support
additional funds to be returned. 
(d) Risk Implications and Mitigation
Increasing demand for care and support to be delivered through Option 1
of SDS drives the increase in financial reviews, this demand is being
supported through the recruitment of dedicated posts to mitigate the
risks associated with not carrying out the financial reviews. 
(e) Staffing Implications
To support in the outstanding financial reviews, additional staffing
resource is required due to the limited capacity within the team and the
competing demands of the team. 
(f) Property 
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
No negative impact has been identified, the recruitment of additional
resource will ensure the team are able to continue to support the front
line delivery of Option 1 (Direct Payments) to ensure support is not
delayed.  The additional capacity will support to address the outstanding
reviews alongside the increasing financial reviews required. 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report  
Page 93

Page 94

(i) Directions
None arising directly from this report 
(j) Consultations
Chief Social Work Officer/Head of Service, Head of Service, Provider
Services Manager, SDS and Unpaid Carers Office, Equal Opportunities
Officer, Accountancy 
6. CONCLUSION 
6.1 For Audit, Performance and Risk Committee to note the current progress
in line with the SDS Option 1 Internal Audit Report 
Author of Report:  Michelle Fleming, Self-Directed Support and Unpaid Carers
Officer
Background Papers:  Moray Direct Payment Audit Delivery Plan (Appendix 1)
Ref: 
Page 94

Page 95

Ref Activities Ref Actions Target
Achievement
Date
Reference To
Separate Project
Plan
Associated Risks (see
Risk Log for detail on
Med and High Risks)
Low , Medium, High
Lead Person(S) Supported
by/Additional
Resources
Required
Progress Notes Status -
(Completed, In
Progress, Not
Started)
Reference to National SDS Improvement Plan
2023-2027
Reference Internal 
Audit
Reference to SDS Framework Standards
1 The SDS Guidance Direct Payment guidance and
financial monitoring procedures should be reviewed
and updated on a regular basis
1.1 Guidance was reviewed in April 2022.  There is a
requirement for an in-depth review of the SDS
policy and the Direct Payment guidance needs to
be undertaken to embed the SDS Standards and
updated Statutory Guidance.
Sep-23 N/A Low Not started 2.1 Improve SDS Practice Resources 5.01 Standard 12: Access to Budgets & Flexibility of
Spend
2.1 To concentrate on those accounts that are due to
have 3 month annual reviews to ensure an early
health check has been carried out
N/A High Service Manager Three month reviews are being prioritised by the
SDS team
In progress 4.3.2.3 Standard 12: Access to Budgets & Flexibility
of Spend (including improving processes and
approches to approving personal budgets)
5.02 Standard 12: Access to Budgets & Flexibility of
Spend
2.2 Review staffing resources to ensure ability to clear
outstanding reviews
Aug-23 N/A High Service Manager Additional posts to
dedicate addressing
financial reviews
Delegated Authority report has been authorised
for the recruitment of up to 4 posts on a
temporary basis until March 2024 to action the
outstanding reviews.  Vacancy Management Form
completed and portal updated to recruit using
reclaimed monies.
In progress 5.02 Standard 12: Access to Budgets & Flexibility of
Spend
2.3 Closing reviews to be undertaken as a further
priority to ensure surplus funds are reclaimed
timeously
N/A High Service Manager Reviews prioritised in the team within the given
capacity and prioritisation of workload
In progress 5.02 Standard 12: Access to Budgets & Flexibility of
Spend
3.1 All 3 month, annual and closing reviews need to be
recorded on CareFIrst and allocated to the
relevant SDS Coordinator
Apr-23 N/A Medium SDS & Carers Officer Information Systems
team support required
Complete Complete 5.03
3.2 Reports to be generated weekly from the CareFirst
system from the records created within
Apr-23 N/A Medium SDS & Carers Officer Information Systems
team support required
Complete, reports are being sent, admin from the
team sends out individual reports from the master
to each SDS Coordinator, highlighting those
overdue and those due that month.
Complete 5.03
4 A risk based approach should be initiated by
management to prioritise outstanding financial
reviews and work through the backlog in an order
which makes the best use of limited resources
4.1 SDS Coordinators to priortise the reviews which
are undertaken
Apr-23 N/A High SDS & Carers Officer Support from Audit Reviews have been prioritised, including closing
reviews, unmanaged accounts, and those who are
due 3 month reviews.  Reviews are also prioritised
where the team are made aware of discrepancies
within accounts
Complete 5.04 Standard 12: Access to Budgets & Flexibility of
Spend
5.1 Payroll providers contacted 6 monthly to remind
them of the need to advise the SDS team of surplus
funds in accounts, or where accounts are
considerably under their permitted contingency
Feb-23 N/A High SDS & Carers Officer Reminders were sent February 2023 and further
reminder scheduled for August 2023
Completed and on-
going
5.05
5.2 Individuals to be contacted to remind them of the
need to monitor their DP balance, and advise the
SDS team should there be excess funds
Feb-23 N/A High SDS & Carers Officer Reminders were sent February 2023 and further
reminder scheduled for August 2023.  The
reminder in August will also include the need to
monitor PA annual leave (where applicable) to
ensure compliance with employment law.
Completed and on-
going
5.05 Standard 12: Access to Budgets & Flexibility of
Spend
6.1 Bank balances for all DP bank accounts to be
obtained
N/A High SDS & Carers Officer Bank balances have now been obtained for
approximately 90% of all accounts. Reviews are
being further prioritised where a significant
surplus or low balance is found
In progress 5.06
6.2 Bank accounts with a surplus identified  need to be
prioritised for review to reclaim funds and to also
ascertain the reason for the build up.  To liaise
with Social Worker where applicable in relation to
the build up with the level of Direct Payment
reduced if no longer required at the current level
N/A High SDS & Carers Officer Delegated Authority report has been authorised
for the recruitment of up to 4 posts on a
temporary basis until March 2024 to action the
outstanding reviews.  Vacancy Management Form
completed and portal updated. To recruit using
reclaimed monies
In progress 5.06
7.1 Financial reviews for one off purchases to be
reviewed within 3 months of the funds being paid
N/A Medium SDS & Carers Officer Reviews for one off purchases are in progress and
being addressed
In progress 5.07 Standard 12: Access to Budgets & Flexibility of
Spend
6 A review should be undertaken of all Service Users in
regard to the current balances held within their SDS
bank account.  Action should then be taken to recover
excess funds
7 In compliance with established procedures, one-off
direct payments should be subject to a financial
monitoring review 3 months (or in limited
circumstances at another interval)after the funding has
been distributed to confirm its appropriate usage
Annual financial reviews should be undertaken in line
with the direct payment financial monitoring
procedures
2
Consideration should be given to the routine
production of reports from the CareFirst system which
can be used to detail financial reviews falling due and
allow management to priortise workloads accordingly. 
The requirement of manual spreadsheets should be
minimised wherever possible to ensure information
reference points come direct from the Care First
system
3
A reminder should be issued to service users, and
approved payroll providers where applicable, to
inform the Authority when funds in excess of the
contingency amount are held.  This may assist in the
prioritisation of early financial reviews and highlight
issues for further investigation
5
Item 11.
Page 95

Page 96

7.2 Financial reviews for purchases like short breaks
through out the year or SDS Carer Payments to be
reviewed 12 months after the payment is made
N/A Medium SDS & Carers Officer Reviews for one off annual purchases like short
breaks. SDS Carer payments are being progressed
and brought up to date.   Those where an on going
payment is also being made are being addressed
simultaneously
In progress 5.07
8.1 Family to be contacted to provide further evidence
of compliance with the agreement
Aug-23 N/A Medium SDS & Carers Officer/
SW Team Manager
Evidence obtained as far as possible, due to the
age of the vehicle, the first service or MOT has not
yet being undertaken.  Recommendations are the
service follows up again after 1st September when
MOT is due and once the first service has been
carried out at 12,000 miles.  Recommended
annual follow ups to evidence continued
compliance.  Evidence of V5, fully comp insurance
seen, (cover until March 2024)
In progress 5.08
8.2 Social Work to be contacted to arrange a joint visit
to see sight of the vehicle and ensure it meets the
agreed specification and being used for the agreed
outcome
Aug-23 N/A Medium SDS & Carers Officer/
SW Team Manager
Social Worker allocated and joint visit with SDS
Coordinator scheduled 3rd August 2023. 
In progress 5.08
8.3 Financial review to be carried out on the
remainder of the On-going DP package
Aug-23 N/A Medium SDS & Carers Officer SDS Coordinator progressing In progress 5.08
9.1 Reviews to be undertaken as a further priority to
ensure surplus funds are reclaimed timeously
N/A Medium SDS & Carers Officer Delegated Authority report has been authorised
for the recruitment of up to 4 posts on a
temporary basis until March 2024 to action the
outstanding reviews.  Vacancy Management Form
completed and portal updated to recruit using
reclaimed monies
In progress 5.09
9.2 Where additional retrospective funds are
approved, these need to be recorded on CareFirst
N/A Medium SDS & Carers Officer In the current process for the SDS Coordinators
and recorded where applicable
In progress 5.09
9.3 Current policy and procedure needs to be
reviewed in line with the national SDS Framework
of Standards, in particular Standard 12, flexible
budgets
N/A Medium SDS & Carers Officer Scheduled in line with Action 1.1 Due Sep 4.3.2.3 Standard 12: Access to Budgets & Flexibility
of Spend (including improving processes and
approches to approving personal budgets)
5.09 Standard 12: Access to Budgets & Flexibility of
Spend
10 Care and support plans should be reviewed annually to
ensure the agreed care is being provided and
continues to meet service user's needs
10.1 Social Work teams to review care and support
packages on an annual basis across all options of
SDS
Social Work Plan High CSWO Being addressed within a separate overarching
plan for Social Work
In progress 5.10 Standard 12: Access to Budgets & Flexibility of
Spend
11 All Social Workers should be reminded of the
requirement to inform the SDS Team of any
amendment to a Support Plan that will have a financial
change to a service user's care package
11.1 SDS Team send a reminder email to all Social Work
teams as a reminder that any new, amend or end
to a Direct Payment needs to be sent as a referral
on CareFirst to the SDS Team
Jan-23 N/A High SDS & Carers Officer Complete, a reminder was being sent 6 monthly,
the team now do this every three months, with the
latter being sent May 2023.  this also includes a
reminder for option 2 tri part agreements to be
addressed in the same manner
Complete and on-
going
5.11 Standard 12: Access to Budgets & Flexibility of
Spend
12.1 SDS & Carers Officer to discuss with Senior
Management the concerns and capacity within the
team to address the required actions
May-23 N/A Low SDS & Carers Officer SDS & Carers Officer presented a 3 Minute Brief to
SMT 31st May requesting additional support to
address the outstanding reviews.  Approved
following discussion with Head of Service for up to
4 posts be recruited to on a temporary basis until
March 2024.   A further discussion will take place
with the Head of Service January 2024 to monitor
progress and develop a clear plan moving forward. 
DAR signed, Job description moved through HR,
VMF completed for posts to be advertised on MJS
In progress 5.12
12.2 Monthly meetings to be arranged with Audit,
Service Manager and SDS & Carers Officer to
monitor progress
Feb-23 N/A Low Service Manager Actioned, monthly meetings are in the diary Complete and on-
going
5.12
12.3 Weekly team meetings to be held to discuss the
CareFirst reports, note progress and escalate any
concerns to the Service Manager
Apr-23 N/A Low SDS & Carers Officer Actioned, added to the agenda for weekly team
meetings
Complete and on-
going
5.12
Closing financial reviews of SDS Care Packages should
be undertaken in accordance with the agreed
procedures.  Evidence should be retained of any
expenditure out with the agreed support plan and of
the full discussions held and decisions made by Social
Workers regarding retrospective authorisation
9
Consideration should be given to the development of
appropriate performance measures to be reported to
service management on a regular basis.  Given the
current backlog of reviews and consequences of Direct
Payment accounts not being scrutinised on a timely
schedule, it may be beneficial for performance
information to be made available for management to
identify any resourcing issues arising and access risks
involved
12
7 In compliance with established procedures, one-off
direct payments should be subject to a financial
monitoring review 3 months (or in limited
circumstances at another interval)after the funding has
been distributed to confirm its appropriate usage
The service should comply with the monitoring
requirements detailed within an agreement between
the council and service user for the purchase and
adaptation of a mini van
8
Page 96

Page 97

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE 
SUBJECT: SELF-DIRECTED SUPPORT OPTION 2 & 3 AUDIT UPDATE 
BY:  SERVICE MANAGER, PROVIDER SERVICES 
1. REASON FOR REPORT 
1.1. To inform the Audit, Performance and Risk Committee in relation to the
progress of the current work being undertaken to achieve the recommendations
outlined in the most recent internal audit report relating to SDS Option 2 and 3
delivery. 
2. RECOMMENDATION 
2.1. It is recommended that the Audit, Performance and Risk Committee
consider and note the current progress relating to the Self-Directed
Support (SDS) Option 2 & 3 audit report. 
3. BACKGROUND 
3.1. The Social Care (Self-Directed Support) (Scotland) Act 2013 was enacted on 1
April 2014 with the Self-Directed Support (SDS) Standards being implemented
in March 2021.  The focus of both the legislation and the standards is to deliver
independent living, enabling people of all ages to have the same freedom,
dignity and control as other citizens at home, work and in the community. 
3.2. An internal audit was carried out looking in greater depth at the systems and
procedures in place to support the delivery and management of adult social
care through SDS Option 2 and 3. 
3.3. An update report was requested from the Audit, Performance and Risk
Committee on the issues found in the audit reports as presented by the Chief
Internal Auditor at the Committee Meeting held on the 29 June 2023 (Item 8 of
the minute refers). 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1. The findings and subsequent actions from the recent option 2 and 3 audit have
been a positive step forward to support the focus of SDS over the next 12
months.  The Self-Directed Support (SDS) Framework of Standards and
Item 12.
Page 97

Page 98

supporting action statements were introduced in March 2021 (currently in
review) to ensure consistency of outcomes and approaches in SDS practice in
Scotland, with the aim to build a framework of good practice in assessment,
support planning and provision of care and support resources.  In light of this,
current practices, alongside the supporting local policy and guidance need to
be reviewed and updated in line with the framework.  The delivery of SDS
Option 2 has been a challenge both locally and nationally to ensure the
greatest choice and flexibility to individuals, with a clear distinction between
more formal commissioned services, which are primarily delivered via an
Option 3 budget. 
4.2. A high level action plan was delivered alongside the audit report, this has now
been developed into an improvement plan, which several delivery plans will
feed into to monitor the separate projects required to underpin the audit
recommendations. 
4.3. Health and Social Care Moray (HSCM) have been utilising a tri-part agreement
to deliver a flexible approach to SDS option 2. This model agreement has been
utilised since March 2022, which ensures all three parties (the individual, the
provider and HSCM) have an understanding of their roles and
responsibilities.  All new support delivered through option 2 in Moray should
utilise this model agreement, and all supports currently in place will have a tri-
part agreement in place once the care package is reviewed.   
4.4. Option 2 has been a challenge to fully embed across Scotland, with CCPS
currently developing a more person centred three way (tri-part) agreement
which makes option 2 less bureaucratic, more flexible and user-friendly.  The
timescales identified within the audit action plan for the embedding of the tri-
part agreements aligns itself with those identified for the completion of the
Social Work Care reviews.  These timescales need to be realistic and
achievable taking into account Social Work capacity, the competing challenges
within the current Social Work and Social Care landscape and current
vacancies and subsequent recruitment to Social Work posts. 
4.5. Reassurance is given that the recent audit has highlighted the same challenges
as faced by other Health and Social Care Partnership’s across Scotland, with
further action plans being developed to meet the recommendations within the
national Improvement plan. These will be aligned to the findings of our internal
audit and the subsequent improvement plan (SEE APPENDIX 1). 
4.6. Supporting individuals to exercise choice and flexibility over their care and
support is the ethos of SDS.  This can be at times limited for individuals due to
the availability of resources in Moray.  The recording of these gaps in resource
is vital for us to collate in terms of market intelligence, having a greater
understanding of demand, and subsequently collaborating with our
communities to ascertain how they can support to shape the demand is
important going forward.  With limited resources we know that we cannot
continue to do more of the same, through taking a strength and asset based
approach, in line with SDS Standard 3 (Strength and Asset-Based Approach)
will support to embed this.  Looking at the strengths of the individual, explore
personal support networks (friends, family and unpaid carers) can support to
meet their outcomes, explore supports from the community and external grants
before identifying an SDS budget will support to ensure choice and flexibility of
Page 98

Page 99

support, delivered in an individual’s own community.  Capturing all identified
resources through good support planning will support to evidence the choice
and flexibility of an individual’s care and support.  Through developing SDS
Standard 4, Meaningful and Measurable Recording Practice; we will be able to
record and capture the data required to shape the market enabling greater
choice for individuals to meet their outcomes in line with the development of
new paperwork (see Appendix 1 Action 1.3) 
4.7. Through further development of Option 2, and the proposed approved
framework, it will afford greater governance in relation to the process, give
clarity on approved rates, and provide a platform for individuals to consider a
range of supports to meet their outcomes.  The framework would not be the
only means of delivery for SDS option 2, but give a platform to base support
planning to generate outcomes, still enabling individuals to choose providers
out with the framework once the appropriate checks have been carried out. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
SDS supports the vision of the MIJB Strategic Plan, the Corporate Plan
and LOIP. The strategy supports Theme 2, Home First Objective 3, we
work together to give you the right care in the right place at the right
time. 
(b) Policy and Legal
Compliance with Social Care (Self-Directed Support) (Scotland) Act
2013, the accompanying statutory guidance and SDS Framework of
Standards alongside the national SDS Improvement Plan. 
(c) Financial implications
SDS Transformation funds are provided each year to support the
embedding of SDS. 
(d) Risk Implications and Mitigation
Through not embedding the recommendations we risk not meeting the
required ethos and principles of SDS in line with the required
governance. 
(e) Staffing Implications
None arising directly from this report 
(f) Property 
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
No negative impact has been identified through embedding the actions
from the audit.  Delivering on the improvement plan will support fair
access to SDS. 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report
Page 99

Page 100

(i) Directions
None arising directly from this report 
(j) Consultations
Chief Social Work Officer/Head of Service, Head of Service, Services
Manager, SDS and Unpaid Carers Officer, Equal Opportunities Officer,
Accountancy 
6. CONCLUSION 
6.1 For Audit, Performance and Risk Committee to note the current progress
in line with the SDS Option 2 and 3 Internal Audit Report. 
Author of Report:  Michelle Fleming, Self-Directed Support and Unpaid Carers
Officer
Background Papers:  Moray Option 2 & 3 Audit Improvement Plan (Appendix 1)
Ref: 
Page 100

Page 101

Ref Activities Ref Actions Target
Achievement
Date
Reference To
Separate Project
Plan
Associated Risks (see
Risk Log for detail on
Med and High Risks)
Low , Medium, High
Lead Person(S) Supported
by/Additional
Resources Required
Progress Notes Status - (Completed,
In Progress, Not
Started)
Reference to National SDS Improvement Plan 2023-2027 Reference Internal 
Audit
Reference to SDS Framework Standards
1.1 Discussions to be held with Social Work staff in
relation to the importance of having the right
conversations and delivering information in a
transparent way to enable individuals to make an
informed decision
Sep-23 High SDS Consultant
Practitioner
1.3.1 Ensure SDS Communications are in accessible formats.  This includes communication
about support planning and the promotion and signposting of appropriate tools and
language services.                                                                                                                        2.2
Social Work education and incorporation of practice development for SDS
5.01 Standard 9 Transparency: 9.4 The offer of a range of options and choices made by the person will be
clearly recorded to provide evidence that the person has been listened to and their preferences
supported
1.2 A training programme to be developed to support
outcomes focussed conversations for all front line
staff
Sep-23 High SDS Consultant
Practitioner
2.2 Social Work education and incorporation of practice development for SDS 5.01
1.3 Develop new Social Work support plan paperwork to
enable recording of good conversations and the
person's choices to be reflected within
Nov-23 High CSWO 5.01 Standard 4; Meaningful & Measurable Recording Practice
1.4 Social Work team managers to support the
implementation through supervision and highlight
good practice/ issues to Practice Governance Board
Sep-23 High CSWO 5.01 Standard 5, Risk Enablement; Workers have clear practise guidance to address the balance between
innovation, choice and risks
1.5 Oversight of Social Work practice to be had at
Practice Governance Board
Aug-23 High CSWO Role and remit of PGB underway following
development sessions held by the CSWO.  TOR's
currently being developed
In progress 5.01 Standard 5, Risk Enablement; Workers have clear practise guidance to address the balance between
innovation, choice and risks
1.6 Ensure the use of the Support in the Right Direction
(SiRD) project is utilised to support independent
conversations around the options of SDS
Jul-23 High SDS & Carers Officer SiRD project funded by Scot Gov to Cornerstone is in
place.  Data sharing agreement in place, process and
recording set up.  Social Work teams aware of the
process to refer into the service
Complete 1.1 Access to SDS Support, brokerage, advice, advocacy and tools 5.01 Standard 1: Independent Support & Advocacy
2.1 Current SDS internal procedures to be updated to
reflect the SDS Framework of Standards and the
updated SDS Statutory Guidance
Oct-23 High SDS & Carers Officer To be reviewed in line with those under 1.1 of the
Option 1 Audit Delivery plan
Not started 5.02 Standard 5; Accountability, Clear and supportive processes are in place for people to challenge and
appeal all decisions affecting their experience of social care support
2.2 Information material for individuals to be reviewed
and updated in line with national developments (incl,
review of resources work, SDS Standards, work of the
PA Programme Board)
Oct-23 High SDS & Carers Officer Information guides are currently being reviewed
through the SiRD project, noting areas for updating
that will feed into the overarching review of
documentation
In progress 1.3 Increase public information about SDS and improve it's reach 5.02
2.3 To review the SDS web page on the TMC internet and
update
Dec-23 Medium SDS & Carers Officer Not started 1.3 Increase public information about SDS and improve it's reach 5.02
3.1 Commissioning team to ensure those services that
are a commissioned service have the spreadsheet
held within SharePoint updated on an annual basis at
the start of each financial year to support budget
forecasting
Aug-23 High Commissioning Lead 5.03
3.2 SDS team to ensure up to date rates of pay for
Personal Assistants, Insurance, Payroll  & PVG's are
updated annual by 1st April each year to support
budget forecasting
Apr-23 High SDS & Carers Officer CFO Rates updated 1st April 2023 on SharePoint, email
sent to all SW teams to advise of the new rates
following approval by CFO
Completed and on going
annually
5.03
3.3 An approved framework to be developed for option
2 providers to ensure transparency of cost and clear
recording of these costs for workers and individuals
to make an informed decision in relation to their care
and support
Jan-24 To be developed High Procurement Manager,
SDS Community
Collaborator
Work was previously underway to develop a robust
process to give transparency and accountability to
TMC, Individuals and Providers.  This work needs to
be re-started
To be progressed 1.2 Improving the availability and flexibility of options; work to address key barriers to use
of SDS Option 2, Support Provider engagement with Option 2, develop and roll-out of tools
and contractual models for Option 2 to increase workforce confidence and efficiency in
offering it.
5.03
3.4 The approved framework to be developed to provide
governance with the option 2 providers, a clear
reporting structure, assurance and a process for
rates to be increased in a governed and transparent
way
Jan-24 To be developed High Procurement Manager,
SDS Community
Collaborator
Work was previously underway to develop a robust
process to give transparency and accountability to
TMC, Individuals and Providers.  This work needs to
be re-started
To be progressed 1.2 Improving the availability and flexibility of options; work to address key barriers to use
of SDS Option 2, Support Provider engagement with Option 2, develop and roll-out of tools
and contractual models for Option 2 to increase workforce confidence and efficiency in
offering it.
5.03
4.1 Team managers to reinforce through team meetings
and practice supervision regarding the importance of
accurate recording on CareFirst
High CSWO 5.04 Standard 4; Meaningful & Measurable Recording Practice
4.2 Governance of recording to be held by the Practice
Governance Board with team managers highlighting
Sep-23 High CSWO Role and remit of PGB underway following
development sessions held by the CSWO.  TOR's
In progress 5.04 Standard 4; Meaningful & Measurable Recording Practice
5.1 Social Work to call upon the SIRD funded project to
support individuals to make an informed choice and
understand the roles and responsibilities that come
with all options, and the need to agree to a tri part
agreement for option 2
May-23 High CSWO SDS & Carers Officer has informed the SW teams of
the independent support available to enable
individuals to make an informed decision in relation
to all option, namely option 2 in this case
Complete 1.1 Access to SDS Support, brokerage, advice, advocacy and tools        1.2 Improving the
availability and flexibility of options; work to address key barriers to use of SDS Option 2,
Support Provider engagement with Option 2, develop and roll-out of tools and contractual
models for Option 2 to increase workforce confidence and efficiency in offering it.
5.05 Standard 1: Independent Support & Advocacy
5.2 Approved Provider Framework for Option 2 to be
developed as per action 3.3, 3.4
Jan-24 To be developed High Procurement Manager,
SDS Community
Collaborator
Work was previously underway to develop a robust
process to give transparency and accountability to
TMC, Individuals and Providers.  This work needs to
be re-started
To be progressed 1.2 Improving the availability and flexibility of options; work to address key barriers to use
of SDS Option 2, Support Provider engagement with Option 2, develop and roll-out of tools
and contractual models for Option 2 to increase workforce confidence and efficiency in
offering it.
5.05
5.3 Social Work staff to be reminded via team meetings
and practise supervision of the requirement to refer
all option 2 start-up, amend or end to the SDS team
via a CareFirst referral
Sep-23 High CSWO Team Managers To be progressed 1.2 Improving the availability and flexibility of options; work to address key barriers to use
of SDS Option 2, Support Provider engagement with Option 2, develop and roll-out of tools
and contractual models for Option 2 to increase workforce confidence and efficiency in
offering it.
5.05
5.4 SDS team to remind all SW teams on a quarterly
basis of the requirement to inform the SDS team of
all new, amend or end tri parts to be sent as a
referral on CareFirst to enable the tri part to be put in
place, varied or closed
Aug-23 High SDS & Carers Officer Actioned in line with the Direct Payment Audit
Delivery Plan Action 11.1, a reminder was being sent
6 monthly, the team now do this every three
months, with the latter being sent May 2023.  This
also includes a reminder for option 2 tri part
agreements to be addressed in the same manner as
Direct Payments
Actioned and ongoing 5.05
5.5 SDS team to maintain an individual spreadsheet
detailing all triparts and share this with Community
Care Finance and Procurement on a monthly basis to
ensure correct payment by CCF and to enable the
SDS Contracts database to be maintained in line with
GDPR
May-23 High SDS & Carers Officer Actioned and in place, being sent at the end of each
month to both CCF and Procurement
Actioned and ongoing 5.05
5.6 Governance and compliance to be monitored
through Practice Governance Board
Aug-23 High CSWO Role and remit of PGB underway following
development sessions held by the CSWO.  TOR's
currently being developed
In progress 5.05
6.1 Lines of communication to be opened with the 3
named providers to work collaboratively with them
to move the service modelling forward
Nov-23 High Commenced via SDS Community Collaborator In progress 1.2 Improving the availability and flexibility of options; work to address key barriers to use
of SDS Option 2, Support Provider engagement with Option 2, develop and roll-out of tools
and contractual models for Option 2 to increase workforce confidence and efficiency in
offering it.
5.06 Standard 7, Flexible & Outcome Focussed Commissioning
An annual reference document detailing a breakdown of
the rates paid to care providers should be provided to all
relevant officers to assist in budgetary planning and the
accurate preparation of an individual's support package
3
A tripartite agreement between the individual using the
care service, Council and care provider should be agreed
for all SDS Option 2 care packages
5
In accordance with SDS Regulations, evidence should be
maintained to document the discussions held by Social
Workers regarding the various care delivery options
discussed with the individual using care services
1
Documented procedures should be developed to support
social workers and individuals using care services in the
selecting of SDS care delivery options
2
A contractual agreement detailing service delivery and
costs should be agreed with the 3 providers of day care
services noted within the findings
6
All officers should be reminded to update the CareFIrst
system to ensure the database is up-to-date and accurate
for each individual using care services
4
Item 12.
Page 101

Page 102

6.2 Discussion to be held with relevant Social Work
teams to explore the future needs for the service and
the contractual models moving forward
Nov-23 High To be progressed 5.06 Standard 7, Flexible & Outcome Focussed Commissioning
6.3 Discussion to be held with current attendees at the
three services as to their preference on Option
delivery to support to inform contractual modelling
Dec-23 High To be progressed 3.1 Improved Involvement of Supported People in Planning; Review the involvement of
supported people and carers in planning, evaluating social care support services and make
improvements where identified, including through the use of Planning with People
Guidance and in line with Equal Partners in Care principles
5.06 Standard 7, Flexible & Outcome Focussed Commissioning
6.4 Align the work with the three providers to that
around the Approved Provider Framework to explore
developing in a collaborative way as per action 5.2,
5.3
Jan-24 High To be progressed 1.2 Improving the availability and flexibility of options; work to address key barriers to use
of SDS Option 2, Support Provider engagement with Option 2, develop and roll-out of tools
and contractual models for Option 2 to increase workforce confidence and efficiency in
offering it.
5.06 Standard 7, Flexible & Outcome Focussed Commissioning
7.1 Work with Social Work to develop a strategy to
ensure all reviews are completed in time
Sep-24 Separate Social Work
plan
High 5.07
7.2 Monitoring to be carried out through the Practice
Governance Board
Aug-23 High CSWO Role and remit of PGB underway following
development sessions held by the CSWO.  TOR's
currently being developed
In progress 5.07
7.3 Moray Integrated Joint Board will be kept sighted on
progress and through performance reporting to
Scottish Government
Jan-24 High CSWO MIJB reports to be developed as requested,
performance data scrutinised weekly
In progress 5.07
8.1 Staff to be reminded of the requirement to ensure
CareFirst is up to date and service agreements
accurately reflect the care and support provided as
per action 4.1, 4.2
High Role and remit of PGB underway following
development sessions held by the CSWO.  TOR's
currently being developed
5.08 Standard 4; Meaningful & Measurable Recording Practice
8.2 SDS team to ensure the Option 2 Tri part
Spreadsheet in maintained and shared with
Community Care Finance at the end of each month
May-23 High SDS & Carers Officer Actioned and in place, being sent at the end of each
month to both CCF and Procurement
Complete and in progress 5.08
8.3 Community Care Finance to use the SDS Option 2 Tri
part agreement spreadsheet to cross reference
invoices against the approved budget on the tri part
agreement
May-23 High Interim Community
Care Finance Officer
Actioned and in place, being sent at the end of each
month to both CCF and Procurement
Complete and in progress 5.08
8.4 Commissioning team to ensure spreadsheet is
maintained on Share Point to support the accurate
development of option 3 support plans as per action
3.1
Aug-23 High Commissioning Lead 5.08
8.5 SDS team  to ensure the spreadsheet on Share Point
is maintained as per action 3.3 to ensure accurate
costing of option 1 support plans
Apr-23 High SDS & Carers Officer Complete and in annual
progress
5.08
9.1 To review the use of Day Care and the eligibility for
attendance in line with Free Personal Care and Day
Opportunities
Dec-23 High Services Manager Not started 5.09
9.2 To review the Contributions Policy in place to ensure
it is accurate and up to date
Dec-23 High CFO Interim CCF Officer Not started 5.09 Standard 9, Transparency
9.3 A report to be submitted to SMT and MIJB of the
evaluation and recommendations for consideration
Jan-24 High CSWO Not started 5.09
10.1 Review current practice in line with the current
financial regulations (incl authorisation levels)
Sep-23 Medium CSWO CFO, Accountancy Not started 5.10
10.2 Process map to be developed highlighting
authorisation levels to ensure compliance with
financial regulations
Oct-23 Medium CSWO CFO, Accountancy Not started 5.10 Standard 9, Transparency
10.3 Consideration to the reviewing of the current
financial regulations in line with Standard 8 Worker
Autonomy
Mar-24 Medium CSWO CFO, Accountancy Not started 5.10 Standard 12, Worker Autonomy
A contractual agreement detailing service delivery and
costs should be agreed with the 3 providers of day care
services noted within the findings
6
Annual support plan reviews of individuals in receipt of
SDS Option 2 and 3 care packages should be undertaken
in accordance with agreed procedures
7
Consideration should be given for management to
undertake regular reviews of the accuracy and recording
of the checks completed to ensure the accuracy of
payments made to care providers
8
The Council's Charging Policy should be reviewed in
regard to day care and a decision made as to whether a
charge should be levied for the service in the future
9
A review of arrangements regarding the authorisation of
individual care packages should be undertaken. 
Thereafter, authorisation requirements should be
documented and communicate to all appropriate officers
10
Page 102

Page 103

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 31 AUGUST 2023 
SUBJECT: CLIENT MONIES AUDIT UPDATE 
BY:  HEAD OF SERVICE/CHIEF SOCIAL WORK OFFICER 
1. REASON FOR REPORT 
1.1. To inform the Audit, Performance and Risk Committee of progress against
recommendations outlined in the November 2022 Client Monies Internal Audit
report. 
2. RECOMMENDATION 
2.1. It is recommended that the Audit, Performance and Risk Committee
consider and note the current progress relating to Client Monies Internal
Audit report. 
3. BACKGROUND 
3.1. Health and Social Care Moray (HSCM) manages income for individuals under
Corporate Appointeeship arrangements.  This is where an individual cannot
manage their monies or also have no alternative person to do so, resulting in
the Council being able to make an application to the Department for Work and
Pensions (DWP) for a named officer to become the Corporate Appointee and
have the legal authority to manage that individual’s personal finances). 
3.2. An audit to review how HSCM manages the income commenced in December
2021. The scope of the audit was to ensure funds were appropriately handled,
stored, recorded and administered on behalf of clients, in line with agreed
policy and procedures.  There are a number of formal arrangements for
assisting individuals in managing their personal income, such as DWP
appointeeship, Access to Funds Scheme and Intervention or Guardianship
orders.  The focus for this audit was on the Corporate Appointeeship awarded
by DWP for clients in receipt of benefit payments. 
3.3. The audit final report was presented to HSCM’s Practice Governance Board in
May 2022.  The audit presented four key recommendations and these were
accepted by the service.  Relevant actions to meet these recommendations
were discussed and agreed. 
Item 13.
Page 103

Page 104

3.4. A follow up review by Internal Audit was undertaken in February 2023 and it
was noted that three of the four recommendations had not yet been fully
implemented.  This report seeks to update the Committee on progress to date
in order to provide assurance that the service is committed to implementing the
agreed recommendations. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1. The Community Care Finance (CCF) team administers the corporate bank
account.  The audit involved scrutiny of the processes undertaken to administer
this. In addition, a sample of individuals was also selected, and a check made
as to how the Health and Social Care Officer appointed as the named
"Corporate Appointee" managed and supported individuals to access their
funds appropriately. 
4.2. At the time of the audit, 59 individuals were being managed within the
"Corporate Appointeeship" Scheme with a combined value of £483,000 held
within the Council's corporate bank account. 
Internal Audit Findings, recommendations and progress updates 
4.3 The key findings and recommendations were accepted by HSCM and work is
ongoing to meet those recommendations.  The key findings could be
summarised as: 
• Procedures required updating and shared widely with relevant staff.
• Changes in working practices due to the pandemic resulted in an
increased risk to cash handling.
• Processes needed strengthened to manage deceased client’s monies
and reconciliation. 
4.4 A summary of findings and recommendations and progress recorded at the last
Internal Audit Follow up Review (February 2023) is attached at APPENDIX 1. 
A further progress update meantime from HSCM is noted below:- 
5.01
The Procedures for
Managing Service
User's Money and
Corporate
Appointeeship should be
reviewed and updated
and a subsequent
regular cycle of review
maintained.
NOT YET IMPLEMENTED: The Procedure is
currently being updated and will be implemented
within HSCM by end September 2023. (Original
implementation date: 31/10/22).
5.02
Procedures for the
management of client
monies should be
promoted to ensure
there is an awareness of
their requirements by all
officers involved in client
finance administration.
NOT YET IMPLEMENTED: Once the procedure is
updated, this will be shared with the Community
Care Finance (CCF) team and Social Work teams
by end September 2023, with the implementation
phase taking place from 1 October 2023.  (Original
implementation date: 31/10/22).
Page 104

Page 105

5.03
Clarification should be
obtained from Legal
Services regarding the
length of time funds
must be retained on
behalf of deceased
clients and potential
action which can be
taken should the funds
not be claimed within the
timeframe.
IMPLEMENTED: Evidence of actions taken to meet
this recommendation was provided to the Audit
team in January 2023.  It was accepted by the Audit
team that no further work was required and all
actions have been met. 
5.04
Due to changes in
operating practices a full
review of current cash
handling procedures
should be undertaken.
The review should
include a risk
assessment to ensure
best practices are
followed regarding the
safety and security of
both officers and client
funds. Documented
procedures should
thereafter be updated to
reflect any agreed
changes.
NOT YET IMPLEMENTED: Work is ongoing to
review internal processes and an update will be
provided at a future meeting.  An Action Plan will
be agreed by September 2023.  (Implementation
date was 31/7/23).
5.05
Confirmation of the
monthly reconciliation of
the Corporate bank
account to manual
records should be
undertaken by
Community Care
Finance management.
This should also include
the verification of a
sample of transactions
to source cumentation
IMPLEMENTED. Evidence of actions taken to
meet this recommendation was provided to the
Audit team in January 2023.  It was accepted by
the Audit team that no further work was required
and all actions have been met. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032” 
Internal audit work supports good governance and assists in securing
appropriate systems of internal control. 
Page 105

Page 106

(b) Policy and Legal 
The Adults with Incapacity (Scotland) Act 2000 enables a Health and
Social Care Officer to be appointed by the DWP to have "Corporate
Appointeeship" responsibility for managing the benefits received by an
individual. Where no alternative exists, the Council can make an
application to the Department for Work and Pensions (DWP) for a
named officer to become the 'Corporate Appointee' and have the legal
authority to manage an individual's personal finances. 
(c) Financial implications
Depending on the outcome of the review (5.04), there is a potential for
further staffing required to undertake other requirements required in
managing clients monies – eg. review of best values, more regular cash
transactions and reconciliations. 
(d) Risk Implications and Mitigation 
The follow up audit review highlighted risk implications and contained
recommendations to address these as means of mitigating.  Progress
update is detailed in section 4.3 of the report. 
(e) Staffing Implications
To support the continuing increase in corporate appointeeships,
additional staffing is required due to the limited capacity within the team
and the competing demands of the team. 
(f) Property 
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
xx 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report 
(i) Directions
None arising directly from this report 
(j) Consultations
Service Manager, Children and Families and Justice Services
Interim Chief Financial Officer, Moray Integrated Joint Board 
6. CONCLUSION 
6.1 For Audit, Performance and Risk Committee to note the current progress
relating to the Client Monies Internal Audit report. 
Author of Report:  Catherine Quinn, Interim Community Care Finance Officer 
Background Papers:  
Ref: 
Page 106