Audit, Performance and Risk Committee 
Thursday, 29 June 2023 
Council Chambers 
NOTICE IS HEREBY GIVEN that a Meeting of the Audit, Performance and Risk
Committee, Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Thursday, 29 June 2023 at 14:00 to consider the business noted below. 
AGENDA 
1. Sederunt 
2. Declaration of Member's Interests 
3. Minute of the meeting of 30 March 2023 5 - 8
4. Action Log of Meeting of 30 March 2023 9 - 10
5. Quarter 4 Performance 11 - 38
6. Internal Audit Section - Update 39 - 68
7. Internal Audit Section Completed Projects 69 - 90
8. Strategic Risk Register 91 - 120
9. Internal Audit Annual Report 2022-23 121 - 130
10. Resilience in Care at Home May 2023 131 - 138
11. Directions Update 139 - 144
12. Improvement Plan for Adult Social Care
Commissioning
145 - 160 
Page 1

Page 2

Page 2

Page 3

MORAY INTEGRATION JOINT BOARD 
SEDERUNT 
Councillor Scott Lawrence  (Chair)  
Mr Derick Murray  (Voting Member)
Mr Sandy Riddell  (Voting Member)
Councillor John Divers  (Voting Member)
Mr Sean Coady  (Member)
Mr Graham Hilditch  (Member)
Mr Simon Bokor-Ingram  (Member)
Ms Sonya Duncan  (Member)
Ms Deborah O'Shea  (Member)  
Mr Stuart Falconer  (Non-Voting Member) 
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 3

Page 4

Page 4

Page 5

MINUTE OF MEETING OF THE AUDIT, PERFORMANCE AND RISK COMMITTEE 
Thursday, 30 March 2023 
Remote Locations via Video Conference 
PRESENT 
Mr Simon Bokor-Ingram, Mr Sean Coady, Councillor John Divers, Mr Graham
Hilditch, Councillor Scott Lawrence, Mr Derick Murray, Ms Deborah O'Shea, Mr
Sandy Riddell 
APOLOGIES 
Ms Sonya Duncan, Mr Stuart Falconer 
IN ATTENDANCE 
Also in attendance at the above meeting were the Chief Internal Auditor, Lizette Van
Hal, Service Manager, Interim Strategy and Planning Lead, Angela Pieri, External
Auditor Grant Thornton, Hannah McKellar, External Auditor Grant Thornton, and
Lindsey Robinson, Committee Service Officer, as clerk to the meeting. 
1.         Chair 
The meeting was chaired by Councillor Scott Lawrence. 
2.         Declaration of Member's Interests 
There were no declarations of Members' Interest in respect of any item on the agenda. 
3.         Minutes 
The minutes of the meetings on 24 November 2022 and 26 January 2023 were
submitted and approved. 
4.         Action Log of Meeting of 24 November 2022 
The Action Log of the meeting of 24 November 2022 was considered and updated
accordingly. 
Item 3.
Page 5

Page 6

5.         Quarter 3 Performance Report 
A report by the Corporate Manager updated the Committee on performance as at
Quarter 3 (October to December 2022). 
During consideration Mr Murray sought clarification as to why some targets have
changed. 
In response, the Chief Officer advised that he did not have the answer to hand and
would need to ask the Corporate Manager and get back to the Committee. 
Thereafter, the Committee agreed to note: 
i. the performance of local indicators for Quarter 3 (October - December 2022) as
presented in the Performance Report at Appendix 1; and 
ii. the analysis of the local indicators that have been highlighted and actions being
undertaken to address performance that is outside of acceptable target ranges as
detailed in Appendix 1 of the report. 
6.         Internal Audit Plan Report 
A report by the Chief Internal Auditor provided the Committee with information on the
proposed internal audit coverage for the 2023/24 financial year. 
During consideration Mr Riddell sought clarification on the resources available to
internal audit and if the Chief Internal Auditor was being given the space to do his job
for the IJB. 
In response the Chief Internal Auditor advised that he was flagging up the increased
demands on internal audit and the available resources as a point of risk. 
Mr Riddell was of the opinion that the Chief Officer should highlight the risks in the
report to the Council Corporate Management Team. 
This was agreed. 
Thereafter the Committee agreed:
i. to note the report and the proposed audit coverage; and 
ii. that the Chief Officer will submit a report to the Corporate Management Team to
highlight the risks within the report. 
7.         Strategic Risk Register 
A report by the Chief Officer provided the Committee with an overview of the current
strategic risks, along with a summary of actions which are in place to mitigate those
risks, updated March 2023. 
During consideration Mr Murray asked if changes could be highlighted in bold to make
it easier to see. 
In response the Chief Officer advised that he could provide a copy with tracked
changes and a clean copy. 
Page 6

Page 7

Thereafter the Committee agreed to: 
i. note the updated Strategic Risk Register included in Appendix 1 of the report; and 
ii. note the Strategic Risk Register will be further refined to align with the
transformation and redesign plans as they evolve. 
8.         External Audit Plan for the Year Ending 2022-23 
A report by the Chief Financial Officer informed the Committee of the Auditor's Annual
Plan for 2022/23. 
The external auditor gave an overview of the plan and any identified risks and advised
that deadlines are moving to pre-Covid timescales. 
Following consideration the Committee agreed to note the contents of the External
Auditor's annual plan for 2022/23. 
9.         Internal Audit Section Completed Projects Report 
A report by the Chief Internal Auditor provided the Committee on audit work completed
since the last meeting of the Committee. 
Following consideration the Committee agreed to note the audit update. 
10.         Civil Contingencies -  Resilience Standards Progress 
A report by the Corporate Manager informed the Committee on the progress against
NHS Grampian's Resilience Improvement Plan 2019-21, and provide an overview of
the work of Health and Social Care Moray's (HSCM) Civil Contingencies Group. 
Following consideration the Committee agreed to: 
i. note the contents of this report alongside the HSCM Civil Contingencies Group
Action Plan in Appendix 1; and 
ii. request an annual assurance report to this Committee from the HSCM Civil
Contingencies Group. 
11.         External Review of Commissioned Services Update Report 
A report by the Chief Social Work Officer informed the Committee of findings and
action plan relating to the external review of the adult Commissioning Service. 
Following consideration the Committee agreed: 
i. to note the findings of the external review included in Appendix 1; and 
ii. the improvement actions included in Appendix 1. 
Page 7

Page 8

Page 8

Page 9

MEETING OF MORAY INTEGRATION JOINT BOARD 
AUDIT, PERFORMANCE AND RISK COMMITTEE 
THURSDAY 30 MARCH 2023 
ACTION LOG 
Item
No.
Title of Report Action Required Due Date Action By Update for 
29 June 2023
1.  Quarter 3
Performance
Report
To get back to committee with reasons why the
targets have changed.  Check with Corporate
Manager
ASAP Chief Officer The targets have not
changed. This is
included in the report
to reflect when new
targets are set as
required by statutory
guidance . Some of
the targets are due
for review.
2.  Internal Audit
Plan
Inform CMT of risks highlighted within the
report
June 2023 Chief Officer Chief Officer
presenting paper to
CMT
3.  Strategic Risk
Register
Provided a tracked change copy and clean
copy to allow changes to be easily seen
June 2023 Chief Officer completed 
Item 4.
Page 9

Page 10

Page 10

Page 11

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 29 JUNE 2023 
SUBJECT: QUARTER 4 (JANUARY TO MARCH 2023) PERFORMANCE
REPORT 
BY:  INTERIM STRATEGY AND PLANNING LEAD 
1. REASON FOR REPORT 
1.1 To update the Audit, Performance and Risk Committee on performance as at
Quarter 4 (January to March 2023). 
2. RECOMMENDATION 
2.1 It is recommended that the Committee consider and note: 
i) the performance of local indicators for Quarter 4 (January to
March 2023) as presented in the Performance Report at
APPENDIX 1; and 
ii) the analysis of the local indicators that have been highlighted and
actions being undertaken to address performance that is outside
of acceptable target ranges as detailed in APPENDIX 1; 
3. BACKGROUND 
3.1   The purpose of this report is to ensure the Moray Integration Joint Board
(MIJB) fulfils its ongoing responsibility to ensure effective monitoring and
reporting on the delivery of services and on the programme of work as set out
in its Strategic Plan. 
3.2   APPENDIX 1 identifies local indicators for the MIJB and the functions
delegated by NHS Grampian and Moray Council, to allow wider scrutiny by
the Board. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 Local Indicators are assessed on their performance via a common
performance monitoring Red, Amber, and Green (RAG) traffic light rating
system. 
RAG scoring based on the following criteria:
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within agreed
tolerance.
RED If Moray is performing worse than target by more than agreed
tolerance.
Item 5.
Page 11

Page 12

4.2 The detailed performance report for quarter 4 is attached in APPENDIX 1.   
Summary
4.3 Performance within Health and Social Care Moray (HSCM) as demonstrated
by the agreed indicators up to the end of quarter 4 of the financial year
2022/23 is showing as variable. Three of the indicators are presenting as
green, two are amber and six are red. This represents a reduced performance
compared to quarters 2 and 3 in 2022/23 and similar to quarter 1 2021/22. 
4.4 Figure 1 provides a summary and the historical trends. A summary of
performance for each of the 6 reporting categories is provided below. Two of
these areas are presenting as green, while one is amber and the other three
are red. 
EMERGENCY DEPARTMENT - GREEN
4.5 There was a decrease in the rate per 1,000 this quarter from 22.6 to 20.6, only
slightly above the number presenting at the same period last year. The trend
over the past 6 months has been a decrease. 
DELAYED DISCHARGES – RED   
4.6 The number of delays at the June snapshot was 26, down from the previous
quarter.  Although the number continues to be above the target of 10, which is
influencing the RED category, it is at its lowest level since August 2021, which
should be recognised as a major success for HSCM. 
4.7 Bed days lost due to delayed discharges reduced from 1063 last quarter to
751 this quarter. This decrease again highlights the successful work
undertaken though the Delay Discharge plan. Although this continues to be
above the target of 304 it is at its lowest level since August 2021, which
contributes to the RED categorisation. 
EMERGENCY ADMISSIONS – AMBER  
4.8 The steady monthly increase in the rate of emergency occupied bed days for
over 65s, noted in previous reports, continued this quarter. Since the end of
quarter 3 the rate has increased from 2,547 to 2,749, exceeding the target of
2,037 per 1,000 population. 
4.9 The emergency admission rate per 1000 population for over 65s has
increased this quarter from 173.3 to 185.8 above the target of 179.9.
Similarly, the number of people over 65 admitted to hospital in an emergency
also increased from 117.4 to 129.2 over the same period. Both of these
indicators are now AMBER having been GREEN for the previous 3 quarters in
2022/23. 
HOSPITAL RE-ADMISSIONS - GREEN
4.10 The 28-day re-admissions remain on target at 7.5%, as does the 7-day re-
admissions which have reduced slightly to 3.6%. 
MENTAL HEALTH – RED  
4.11 After achieving 79% in quarter 3 there has been slight reduction in
performance during this quarter with 73% of patients being referred within 18
weeks at the end of quarter 4.
Page 12

Page 13

STAFF MANAGEMENT – RED   
4.12 NHS employed staff sickness levels (to the end of quarter 4) have increased
from to 5.1% from 5.9%, above the target of 4%. Council employed staff
sickness was 9.7% last quarter, more than double the 4% target. 
Figure 1 – Performance Summary 
Note: In order to match other national and local data sources indicators are showing the last month in the reporting quarter. 
*From May 2022, the census figures for April 2021 onwards include delays due to infection control measures in place at
hospital (delay reason codes 26X and 46X) 
5. AREAS NOT MEETING TARGETS  
Delayed Discharge
5.1 The number of people waiting to be discharged from hospital at census date
(DD-01) has reduced again in quarter 4 to 26 delays and is the lowest since
August 2021 as is the number of bed days occupied (DD-02) at 751 days, and
early figures show that this looks to be continuing on that trajectory into
2023/24. 
5.2 Whole system Moray Portfolio meetings, which occur daily, have been taking
place with operational staff from all services to ensure system wide
awareness of the pressures that might cause issues with patient flow. The
meeting begins with an overview of the current status of all services and then
provides a platform to support staff with problems that might interrupt flow. It is
also an opportunity to deploy available resource to the most critical
areas. This has resulted in improved communication, quicker placement and
improved flow. In addition to this more care home beds have been made
available due to an agreement to pay from offer of care home bed to ensure
beds are free on discharge date. 
5.3 This reduction is also in part due to the new classification of delays to
discharge in the NHS system introduced across Scotland in February 2023.
The new Planned Discharge Date (PDD) system changed the criterion from
Page 13

Page 14

‘medically fit’ to ‘clinically fit’. When we declare a person is clinically fit it allows
time for occupational therapy, physio-therapy and social work to carry out their
assessments before the person is categorised as a delay, and this measure
has reduced delays slightly. While this has resulted in longer stays prior to an
agreed discharge date it has aligned Moray practice with the rest of Scotland. 
5.4 Additionally, the Hospital Discharge Team continues to scrutinise all delays
daily and ensure they are still relevant, more people have been recruited into
the Care at Home team enabling more rotas to be opened and there are fewer
people requiring double-up care than in recent months. 
5.5 Despite still not achieving the target the improvement in both delayed
discharge measures is worth noting as have the measures that have been put
in place and the work that has gone into achieving the improvement to date by
the teams. 
Emergency Admissions 
5.6 The rate of emergency occupied bed days has been consistently increasing
since March 2021. This measure has seen a continual rise to 2,749 at the end
of quarter 4 reflects a system still under pressure despite the gains made in
other measures. The numbers of admissions in EA-02 and EA-03 have not
increased along with this and would suggest people are spending more time
in hospital as a whole. A number of surge beds being made available in Moray
have contributed to this increase due to increased capacity. 
5.7 Moray’s aging population will also be a factor  as patients over 65 are more
likely to spend time in hospital after the point at which they are ‘fit’ to be
transferred or discharged from an acute care setting because more support
needs to be organised to facilitate a discharge home. 
5.8 With the reduction in delayed discharges this figure will decrease in the
coming months, as it is a rolling 12 month figure, so there is a time lag in any
improvements made in the system showing in the longer term trend analysis. 
Mental Health 
5.9 There was a slight reduction in the percentage of patients receiving
psychological therapy treatment within 18 weeks (MH-01) from 79% in quarter
3 to 73% at the end of March 2023, but this is much higher than the figure at
the same point in 2021/22 (33% at the end of quarter 4) but the target of 90%
is still not being achieved. 
5.10 This is due to a variety of factors such as an increase in the number and
complexity of referrals, long term sickness absence within the team, upcoming
maternity leave and a further period of planned sick leave.  The team are
working hard to reduce waiting times and are addressing this through current
and planned group work, allowing for more people to be seen in a timely
manner.  However, this is not suitable for all people referred into the service. 
5.11 The service is also linked into the Grampian wide Psychological Therapies
Improvement Board meetings looking at capacity within the service and
trajectory planning. 
Page 14

Page 15

5.12 Without recruitment to the maternity leave post and as a result of further
planned sick leave, it is difficult to predict when this position may change. 
Staff Management
5.13 Sickness absence for Moray Council employed HSCM staff has increased
from 8.3% in quarter 3 to 9.7% in quarter 4.  This is the highest it has been in
the two years.  After a decrease in quarter 2 this is now showing an increasing
trend as shown in figure 1. 
Figure 1 – Moray Council Sickness absence % of days lost 
5.14 NHS staff absences due to sickness are continuing to increase from 5.1% in
quarter 3 to 5.9% at the end of quarter 4. 
Figure 2 – NHS Sickness absence % of days lost 
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
Q1
2020/21
Q2
2020/21
Q3
2020/21
Q4
2020/21
Q1
2021/22
Q2
2021/22
Q3
2021/22
Q4
2021/22
Q1
2022/23
Q2
2022/23
Q3
2022/23
Q4
2022/23
Rate Target Linear (Rate)
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
Q4
2022/23
Q3
2022/23
Q2
2022/23
Q1
2022/23
Q4
2021/22
Q3
2021/22
Q2
2021/22
Q1
2021/22
Q4
2020/21
Q3
2020/21
Q2
2020/21
Q1
2020/21
Rate Target Linear (Rate)
Page 15

Page 16

5.15 The recruitment cell continues to give excellent support to Provider Services
working to highlight the team and their role. Recruitment has been ongoing
with 21 new Social Care Assistants (SCAs) starting in quarter 4, bringing the
total of new SCAs for 2022/23 to 71.  The largest proportion of these recruits
(42.3%) coming from outside of care sector, followed by those coming from
other care companies in the Moray area (33.8%). 
5.16 Temporary staff were employed for 12 months as Care at Home Officers to fill
the gaps left by secondments and other absences and to provide support to
all SCAs.  
5.17 Care at Home continue to react to staffing pressures from sickness and
annual leave.  The average sickness rate in quarter 4 was 9.6% slightly higher
than the average rate in quarter 3 of 8.5%, but lower than quarter 4 2021/22
which was 9.9%.  It is expected that annual leave will now account for the
highest number of staff not at work as we head into the busy holiday period. 
SOCIAL CARE 
5.18 The data shows people waiting for social care assessment has rapidly
decreased since January 2023. There has been a test of change within the
Access Teams to address the challenge of what was a very lengthy waiting
list, with people then waiting considerable time for their assessment.   The
predominant focus of the teams is to support those with an ongoing and
continued need for social work, social care, and MDT support, from the outset.
In attempting to redefine the role and function of the teams and to improve
social work practice one of the benefits is that collectively the teams are now
in a position to undertake more assessments.  The other contributing factor in
the decrease in numbers of people waiting for assessment is the use of 3 care
enablers, who undertake assessments where a care need is identified. 
Figure 3 – Unmet Need 
Page 16

Page 17

5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2022-2032”
Performance management reporting is a legislative requirement under
section 42 of the Public Bodies (Joint Working) (Scotland) Act 2014.   
In addition to publishing an Annual Performance Report, the Moray
Integration Scheme requires that the MIJB will “monitor the performance
of the delivery of integrated services using the Strategic Plan on an
ongoing basis” (para 5.2.2 of the Moray Integration Scheme refers). 
(b) Policy and Legal
None directly associated with this report. 
(c) Financial implications
None directly associated with this report. 
(d) Risk Implications and Mitigation
There are no risk issues arising directly from this report. The long-term
impact of the COVID-19 on the Health and Social Care system are still
unknown and performance measurement will remain flexible to enable
the service to be prepared and react to any future developments. 
(e) Staffing Implications  
None directly associated with this report. 
(f) Property
None directly associated with this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required for the Performance
Framework because there will be no impact, as a result of the report, on
people with protected characteristics. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined for
this policy/activity. It should be noted that extreme weather events, such
as the recent storms, are expected to occur more frequently and with
greater ferocity in future years. In the longer-term there are likely to be
issues with the reduction in availability and increases in costs of fossil
fuels that will pose challenges for the delivery of care services to people
living in rural areas. 
(i) Directions
There are no directions arising from this report.  
Page 17

Page 18

(j) Consultations
Senior Management Team, Health and Social Care, consulted as has
the Democratic Services Manager, Moray Council and their comments
are incorporated in the report. 
6. CONCLUSION 
6.1 This report provides the MIJB with an overview of the performance of
specified Local and National indicators and outlines actions to be
undertaken to improve performance in Section 4 and expanded on in
APPENDIX 1.   
Authors of Report: Aylsa Kennedy, Performance Officer   
Bruce Woodward, Performance Support Officer
Background Papers: Available on request
Ref: 
Page 18

Page 19

Appendix 1
PERFORMANCE REPORT
- SUPPORTING CHARTS 
QUARTER 4
2022/23
(1 JANUARY 2023 – 31 MARCH 2023)
Item 5.
Page 19

Page 20

Table of Contents  
Health and Social Care Moray - 1 - 2022-23 Quarter 1 Performance Report
1. TABLE OF CONTENTS
1. Table of Contents ............................................................................................................................. 1
1. Performance Summary .................................................................................................................... 2
Barometer Overview ........................................................................................................................... 2
2. Delayed Discharge - RED .................................................................................................................. 3
DD-01: Number of delayed discharges (including code 9, Census snapshot, at end of quarter) ....... 3
DD-02: Number of Bed Days Occupied by Delayed Discharges per quarter (inc code 9) per 1000 18+
population ........................................................................................................................................... 4
3. Emergency Admissions - AMBER ..................................................................................................... 5
EA-01: Rate of emergency occupied bed days for over 65s per 1000 population .............................. 5
EA-02: Emergency Admissions rate per 1000 population for over 65s .............................................. 6
EA-03: Number of people over 65 years admitted as an emergency in the previous 12 months per
1000 population .................................................................................................................................. 7
4. Emergency Department – RED ........................................................................................................ 8
AE-01: ED Attendance rates per 1,000 population (All Ages) ............................................................. 8
5. Hospital Re-admissions - AMBER ..................................................................................................... 9
HR-01: Percentage of Emergency Re-admissions to hospital within 28 days - Moray Patients ......... 9
HR-02: Percentage of Emergency Re-admissions to hospital within 7 days - Moray Patients ......... 10
6. Mental Health – RED ...................................................................................................................... 11
MH-01: Percentage of patients commencing Psychological Therapy Treatment within 18 weeks of
referral ............................................................................................................................................... 11
7. Staff Management - RED ............................................................................................................... 12
SM-01: NHS Sickness Absence % of Hours Lost ................................................................................ 12
SM-02: Council Sickness Absence (% of Calendar Days Lost) ............................................................ 12
Council STAFF Absence OVER TIME – SCOTLAND COMPARISON...................................................... 14
Appendix 1: Key and Data Definitions .................................................................................................. 15
RAG Scoring Criteria .......................................................................................................................... 15
Peer Group Definition ....................................................................................................................... 15
Appendix 2: Strategic Priorities............................................................................................................. 16
Appendix 3: National Health and Wellbeing Outcomes ....................................................................... 18 
Page 20

Page 21

Performance Summary  
Health and Social Care Moray - 2 - 2022-23 Quarter 1 Performance Report
1. PERFORMANCE SUMMARY
BAROMETER OVERVIEW 
Moray currently has 11 local indicators. Of these 3 are Green, 2 are Amber and 6 are Red. 
Figure 1 - Performance Summary       
Page 21

Page 22

Delayed Discharge - RED
Health and Social Care Moray - 3 - 2022-23 Quarter 1 Performance Report
2. DELAYED DISCHARGE - RED
Trend Analysis 
The number of delays at the June snapshot was 26, down from the previous quarter.  Although the
number continues to be above the target of 10 it is at its lowest level since August 2021. 
Bed days lost due to delayed discharges reduced from 1063 last quarter to 751 this quarter. Although
the number continues to be above the target of 304 it is at its lowest level since August 2021. 
DD-01: NUMBER OF DELAYED DISCHARGES (INCLUDING CODE 9, CENSUS SNAPSHOT,
AT END OF QUARTER)
Purpose 
Reliably achieving timely discharge from hospital is an important indicator of
quality and is a marker for person centred, effective, integrated, and harm
free care.
Strategic Priority  2: HOME FIRST Linked Indicator(s) DD-02
National Health & Wellbeing Outcomes 2, 3, 5, 7 
Figure 2 – Delayed Discharges
Indicator Trend – Decreasing
Despite some volatility in numbers from month to month the underlying trend for the number of
people experiencing Delayed Discharge had been decreasing since the end of Quarter 2 2022/23. 
Source Public Health Scotland
0
10
20
30
40
50
60
Jan-19
Mar-19
May-19
Jul-19
Sep-19
Nov-19
Jan-20
Mar-20
May-20
Jul-20
Sep-20
Nov-20
Jan-21
Mar-21
May-21
Jul-21
Sep-21
Nov-21
Jan-22
Mar-22
May-22
Jul-22
Sep-22
Nov-22
Jan-23
Mar-23
Number
Delayed Discharges (including code 9) at Census Point
Number Target
Page 22

Page 23

Delayed Discharge - RED
Health and Social Care Moray - 4 - 2022-23 Quarter 1 Performance Report
DD-02: NUMBER OF BED DAYS OCCUPIED BY DELAYED DISCHARGES PER QUARTER (INC
CODE 9) PER 1000 18+ POPULATION 
Purpose  This monitors the number of people delayed in hospital once medically fit
for discharge. Longer stays in hospital are associated with increased risk of
infection, low mood, and reduced motivation.
Strategic Priority  2: HOME FIRST Linked Indicator(s) DD-01
National Health & Wellbeing Outcomes 2, 3, 5, 7 
Figure 3 – Delayed Discharge Bed-days
Indicator Trend – Decreasing
The number of bed-days are over 2 times the target number of days but this is less than previous
quarters, and similar to quarter 2 2021/22.
Source Public Health Scotland
0
200
400
600
800
1000
1200
1400
1600
Jan-19
Feb-19
Mar-19
Apr-19
May-19
Jun-19
Jul-19
Aug-19
Sep-19
Oct-19
Nov-19
Dec-19
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Jan-21
Feb-21
Mar-21
Apr-21
May-21
Jun-21
Jul-21
Aug-21
Sep-21
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
Number
Delayed Discharge Bed Days
Number Target
Page 23

Page 24

Emergency Admissions - AMBER
Health and Social Care Moray - 5 - 2022-23 Quarter 1 Performance Report
3. EMERGENCY ADMISSIONS - AMBER
Trend Analysis
The steady monthly increase in the rate of emergency occupied bed days for over 65s, noted in
previous reports, continued this quarter. Since the end of quarter 3 the rate has increased from 2,547
to 2,749, exceeding the target of 2,037 per 1,000 population. 
The emergency admission rate per 1000 population for over 65s has increased this quarter from 173.3
to 185.8 above the target of 179.9.
Similarly, the number of people over 65 admitted to hospital in an emergency also increased from
117.4 to 129.2 over the same period. Both of these indicators are now AMBER having been GREEN
for the previous 3 quarters in 2022/23. 
EA-01: RATE OF EMERGENCY OCCUPIED BED DAYS FOR OVER 65S PER 1000
POPULATION
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a narrative
when viewed together of whether emergency admissions and bed days are
within tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) EA-02, EA-03
National Health & Wellbeing Outcomes 1, 2, 3, 5 
Figure 4 – Emergency Occupied Bed-days (Over 65s)
Indicator Trend – Increasing
Since the start of 2021 has been increasing and has exceeded the reduced target since quarter 3
2021/22.
Source Health Intelligence
0
500
1000
1500
2000
2500
3000
Jan-19
Feb-19
Mar-19
Apr-19
May-19
Jun-19
Jul-19
Aug-19
Sep-19
Oct-19
Nov-19
Dec-19
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Jan-21
Feb-21
Mar-21
Apr-21
May-21
Jun-21
Jul-21
Aug-21
Sep-21
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
Rate per 1000 Population
Emergency Occupied Bed Days for over 65s
Rate Target
Page 24

Page 25

Emergency Admissions - AMBER
Health and Social Care Moray - 6 - 2022-23 Quarter 1 Performance Report
EA-02: EMERGENCY ADMISSIONS RATE PER 1000 POPULATION FOR OVER 65S
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a story when
viewed together of whether emergency admissions and bed days are within
tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) EA-01, EA-03 
National Health & Wellbeing Outcomes  1, 2, 3, 5 
Figure 5 – Emergency Admissions (Over 65s)
Indicator Trend – Increasing
The trend is now increasing, after a sustained reduction over the latter half of 2022, and above
levels seen at the same point in 2022.
Source Health Intelligence
160
165
170
175
180
185
190
195
Jan-19
Feb-19
Mar-19
Apr-19
May-19
Jun-19
Jul-19
Aug-19
Sep-19
Oct-19
Nov-19
Dec-19
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Jan-21
Feb-21
Mar-21
Apr-21
May-21
Jun-21
Jul-21
Aug-21
Sep-21
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
Rate per 1000 Population
Emergency Admissions for over 65s
Rate Target
Page 25

Page 26

Emergency Admissions - AMBER
Health and Social Care Moray - 7 - 2022-23 Quarter 1 Performance Report
EA-03: NUMBER OF PEOPLE OVER 65 YEARS ADMITTED AS AN EMERGENCY IN THE
PREVIOUS 12 MONTHS PER 1000 POPULATION
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a story when
viewed together of whether emergency admissions and bed days are
within tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) EA-01, EA-02
National Health & Wellbeing Outcomes 1, 2, 3, 5 
Figure 6 – Number of Over 65 People Emergency Admissions
Indicator Trend – Increasing
The trend is now increasing, after a sustained reduction over the latter half of 2022, and above
levels seen at the same point in 2022.
Source Health Intelligence
105
110
115
120
125
130
135
Jan-19
Feb-19
Mar-19
Apr-19
May-19
Jun-19
Jul-19
Aug-19
Sep-19
Oct-19
Nov-19
Dec-19
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Jan-21
Feb-21
Mar-21
Apr-21
May-21
Jun-21
Jul-21
Aug-21
Sep-21
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
Rate per 1000 Population
Number of people admitted as an emergency over 65
Rate Target
Page 26

Page 27

Emergency Department – RED
Health and Social Care Moray - 8 - 2022-23 Quarter 1 Performance Report
4. EMERGENCY DEPARTMENT – RED
Trend Analysis
There was a decrease in the rate per 1,000 this quarter from 22.6 to 20.6, only slightly above the
number presenting at the same period last year. The trend over the past 6 months has been a
decrease.
AE-01: ED ATTENDANCE RATES PER 1,000 POPULATION (ALL AGES)
Purpose  A greater system-wide understanding of how people access emergency
care, and why certain choices are made, will allow local health systems to
develop intelligence about avoidable attendances at emergency
departments and target their responses. 
Strategic Priority  3: PARTNERS IN CARE Linked Indicator(s) HR-01, HR-02
National Health & Wellbeing Outcomes  1, 2, 3, 5 
Figure 7 – ED Attendance Rate
Indicator Trend – Stable
During quarter 3 the attendance rate per 1,000 population has remained stable, sitting just
above the target level. However, the attendance rate has fallen below the target in the last
quarter of 2022/23.
Source Health Intelligence
0
5
10
15
20
25
30
Jan-19
Mar-19
May-19
Jul-19
Sep-19
Nov-19
Jan-20
Mar-20
May-20
Jul-20
Sep-20
Nov-20
Jan-21
Mar-21
May-21
Jul-21
Sep-21
Nov-21
Jan-22
Mar-22
May-22
Jul-22
Sep-22
Nov-22
Jan-23
Mar-23
Rate per 1000 Population
ED Attendance Rate
Rate Target
Page 27

Page 28

Hospital Re-admissions - AMBER
Health and Social Care Moray - 9 - 2022-23 Quarter 1 Performance Report
5. HOSPITAL RE-ADMISSIONS - AMBER
Trend Analysis
The 28-day re-admissions remain on target at 7.5%, as does the 7-day re-admissions which have
reduced slightly to 3.6%.
HR-01: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO HOSPITAL WITHIN 28 DAYS
- MORAY PATIENTS
Purpose  Re-admissions are often undesirable for patients and have also been shown
to be associated with the quality of care provided to patients at several
stages along the clinical pathway, including during initial hospital stays,
transitional care services and post-discharge support. (This measure lags by
a month due to the time required for a potential 28 day discharge to occur)
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) HR-02, AE-01
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 8 – 28-dayEmergency Readmissions 
Indicator Trend – Stable
28-day Hospital Re-admissions have remained around the target of 8.4% for this quarter.
Source Health Intelligence
0%
2%
4%
6%
8%
10%
12%
14%
Jan-19
Feb-19
Mar-19
Apr-19
May-19
Jun-19
Jul-19
Aug-19
Sep-19
Oct-19
Nov-19
Dec-19
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Jan-21
Feb-21
Mar-21
Apr-21
May-21
Jun-21
Jul-21
Aug-21
Sep-21
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
Percentage
28 Day Emergency Readmissions
28 Day Rate Target 28 days
Page 28

Page 29

Hospital Re-admissions - AMBER
Health and Social Care Moray - 10 - 2022-23 Quarter 1 Performance Report
HR-02: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO HOSPITAL WITHIN 7 DAYS -
MORAY PATIENTS
Purpose  Re-admissions are often undesirable for patients and have also been shown
to be associated with the quality of care provided to patients at several
stages along the clinical pathway, including during initial hospital stays,
transitional care services and post-discharge support.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) HR-01, AE-01
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 9 – 7-day Emergency Readmissions
Indicator Trend – Stable
7-day Hospital Re-admissions have remained around the target of 4.2% for this quarter.
Source Health Intelligence
0%
1%
2%
3%
4%
5%
6%
7%
Jan-19
Feb-19
Mar-19
Apr-19
May-19
Jun-19
Jul-19
Aug-19
Sep-19
Oct-19
Nov-19
Dec-19
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Jan-21
Feb-21
Mar-21
Apr-21
May-21
Jun-21
Jul-21
Aug-21
Sep-21
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
Percentage
7 Day Emergency Readmissions
7 Day Rate Target 7 days
Page 29

Page 30

Mental Health – RED  
Health and Social Care Moray - 11 - 2022-23 Quarter 1 Performance Report
6. MENTAL HEALTH – RED 
Trend Analysis 
After achieving 79% in quarter 3 there has been slight reduction in performance during this quarter
with 73% of patients being referred within 18 weeks at the end of quarter 4. 
MH-01: PERCENTAGE OF PATIENTS COMMENCING PSYCHOLOGICAL THERAPY
TREATMENT WITHIN 18 WEEKS OF REFERRAL
Purpose  Timely access to healthcare is a key measure of quality and that applies
equally in respect of access to mental health services.
Strategic Priority  3: PARTNERS IN CARE Linked Indicator(s) 
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 10 – Psychological Therapy Treatment within 18 Weeks 
Indicator Trend – Increasing
After being consistently low for 4 quarters the rate has started to return to pre pandemic levels.
Source Health Intelligence  
0%
20%
40%
60%
80%
100%
120%
Jan-19
Feb-19
Mar-19
Apr-19
May-19
Jun-19
Jul-19
Aug-19
Sep-19
Oct-19
Nov-19
Dec-19
Jan-20
Feb-20
Mar-20
Apr-20
May-20
Jun-20
Jul-20
Aug-20
Sep-20
Oct-20
Nov-20
Dec-20
Jan-21
Feb-21
Mar-21
Apr-21
May-21
Jun-21
Jul-21
Aug-21
Sep-21
Oct-21
Nov-21
Dec-21
Jan-22
Feb-22
Mar-22
Apr-22
May-22
Jun-22
Jul-22
Aug-22
Sep-22
Oct-22
Nov-22
Dec-22
Jan-23
Feb-23
Mar-23
Percentage
Psychological Therapy Treatment within 18 weeks
% within 18wks Target
Page 30

Page 31

Staff Management - RED
Health and Social Care Moray - 12 - 2022-23 Quarter 1 Performance Report
7. STAFF MANAGEMENT - RED
Trend Analysis 
Sickness absence for NHS employed staff rose to 6.4 during quarter 3, but has since reduced and for
the first 2 months of quarter 1 is at 4.2%. This may indicate that staffing absence is back to pre-
pandemic levels for NHS employed staff. However, Council employed staff sickness has remained high
with a minimal reduction from 8.98% to 8.87%, which is above the figure for the same period in the
previous 2 years. 
SM-01: NHS SICKNESS ABSENCE % OF HOURS LOST
Purpose  Attendance at work of all employees is essential in the interests of the
effective and efficient operation of services.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) SM-02
National Health & Wellbeing Outcome  8
Target +10%) Q3 21/22 Q4 21/22 Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
4% 5.5% 4.7% 4.2% 5.0% 5.1% 5.9%
Figure 11 – NHS Sickness Absence
Indicator Trend – Increasing
This indicator had been increasing over 2022/23 and continues to do so.
Source Health Intelligence
SM-02: COUNCIL SICKNESS ABSENCE (% OF CALENDAR DAYS LOST)
0%
1%
2%
3%
4%
5%
6%
7%
Jan-19
Mar-19
May-19
Jul-19
Sep-19
Nov-19
Jan-20
Mar-20
May-20
Jul-20
Sep-20
Nov-20
Jan-21
Mar-21
May-21
Jul-21
Sep-21
Nov-21
Jan-22
Mar-22
May-22
Jul-22
Sep-22
Nov-22
Jan-23
Mar-23
Percentage
NHS Sickness Absence (hours lost)
Rate Target
Page 31

Page 32

Staff Management - RED
Health and Social Care Moray - 13 - 2022-23 Quarter 1 Performance Report
Purpose  Attendance at work of all employees is essential in the interests of the
effective and efficient operation of services.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) SM-01
National Health & Wellbeing Outcome  1, 2, 3, 5
Target Q3 21/22 Q4 21/22 Q1 22/23 Q2 22/23 Q3 22/23 Q4 22/23
4% 8.05% 8.98% 8.87% 5.22% 8.34% 9.73% 
Figure 12 – Moray Council Sickness Absence
Indicator Trend – Increasing
This indicator continues to rise, remaining double the target and close to the figure of 10%. 
Source Council HR
0%
2%
4%
6%
8%
10%
12%
Percentage
Moray Council Sickness Absence (hours lost)
Rate Target
Page 32

Page 33

Staff Management - RED  
Health and Social Care Moray - 14 - 2022-23 Quarter 1 Performance Report
COUNCIL STAFF ABSENCE OVER TIME – SCOTLAND COMPARISON 
Chart provided by the Improvement Service using data from the from weekly SOLACE council
returns. This update captures data from the week ending 22 July 2022. Moray remains above the
Scottish average. 
Figure 13 – Moray Council Sickness Absence Compared to National Average 
Page 33

Page 34

Staff Management - RED  
Health and Social Care Moray - 15 - 2022-23 Quarter 1 Performance Report
APPENDIX 1: KEY AND DATA DEFINITIONS
RAG SCORING CRITERIA
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within specified tolerance.
RED If Moray is performing worse than target but outside of specified
tolerance. 
PEER GROUP DEFINITION
Moray is defined as being in Peer Group 2 in the Local Government Benchmarking Framework 
Family Group 1 Family Group 2 Family Group 3 Family Group 4
East Renfrewshire
East Dunbartonshire
Aberdeenshire
Edinburgh, City of
Perth & Kinross
Aberdeen City
Shetland Islands
Orkney Islands
Moray
Stirling
East Lothian
Angus
Scottish Borders
Highland
Argyll & Bute
Midlothian
Falkirk
Dumfries & Galloway
Fife
South Ayrshire
West Lothian
South Lanarkshire
Renfrewshire
Clackmannanshire
Eilean Siar
Dundee City
East Ayrshire
North Ayrshire
North Lanarkshire
Inverclyde
West Dunbartonshire
Glasgow City 
Page 34

Page 35

Staff Management - RED  
Health and Social Care Moray - 16 - 2022-23 Quarter 1 Performance Report
APPENDIX 2: STRATEGIC PRIORITIES 
Page 35

Page 36

Staff Management - RED  
Health and Social Care Moray - 17 - 2022-23 Quarter 1 Performance Report 
Page 36

Page 37

Staff Management - RED  
Health and Social Care Moray - 18 - 2022-23 Quarter 1 Performance Report
APPENDIX 3: NATIONAL HEALTH AND WELLBEING OUTCOMES
1 - PEOPLE ARE ABLE TO LOOK AFTER AND IMPROVE THEIR OWN HEALTH AND WELLBEING AND
LIVE IN GOOD HEALTH FOR LONGER. 
2 - PEOPLE, INCLUDING THOSE WITH DISABILITIES OR LONG-TERM CONDITIONS, OR WHO ARE
FRAIL; ARE ABLE TO LIVE, AS FAR AS REASONABLY PRACTICABLE, INDEPENDENTLY AT HOME,
OR IN A HOMELY SETTING IN THEIR COMMUNITY. 
3 - PEOPLE WHO USE HEALTH AND SOCIAL CARE SERVICES HAVE POSITIVE EXPERIENCES OF
THOSE SERVICES, AND HAVE THEIR DIGNITY RESPECTED. 
4 - HEALTH AND SOCIAL CARE SERVICES ARE CENTRED ON HELPING TO MAINTAIN OR IMPROVE
THE QUALITY OF LIFE OF PEOPLE WHO USE THOSE SERVICES. 
5 - HEALTH AND SOCIAL CARE SERVICES CONTRIBUTE TO REDUCING HEALTH INEQUALITIES. 
6 - PEOPLE WHO PROVIDE UNPAID CARE ARE SUPPORTED TO LOOK AFTER THEIR OWN HEALTH
AND WELLBEING, INCLUDING TO REDUCE ANY NEGATIVE IMPACT OF THEIR CARING ROLE ON
THEIR OWN HEALTH AND WELLBEING. 
7 - PEOPLE USING HEALTH AND SOCIAL CARE SERVICES ARE SAFE FROM HARM. 
8 - PEOPLE WHO WORK IN HEALTH AND SOCIAL CARE SERVICES FEEL ENGAGED WITH THE WORK
THEY DO AND ARE SUPPORTED TO CONTINUOUSLY IMPROVE THE INFORMATION, SUPPORT,
CARE, AND TREATMENT THEY PROVIDE. 
9 - RESOURCES ARE USED EFFECTIVELY AND EFFICIENTLY IN THE PROVISION OF HEALTH AND
SOCIAL CARE SERVICES.
Page 37

Page 38

Page 38

Page 39

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 29 JUNE 2023 
SUBJECT: INTERNAL AUDIT SECTION - UPDATE REPORT 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 Committee is asked to consider the contents of this report; seek
clarification on any points noted and otherwise note the report.   
2. RECOMMENDATION 
2.1 The Audit, Performance and Risk Committee is asked to consider and
note this audit update. 
3.  BACKGROUND 
3.1 Public Sector Internal Audit Standards (PSIAS) require the Chief Internal
Auditor to prepare and present reports to committee on internal audit’s activity
relative to the audit plan and on any other relevant matters. 
4.  KEY MATTERS RELEVANT TO RECOMMENDATION 
Public Sector Internal Audit Standards (PIAS)
4.1 The Local Authority Accounts (Scotland) Regulations 2014 require public
bodies to operate a professional and objective internal auditing service in
accordance with recognised standards and practices in relation to internal
auditing, the Public Sector Internal Audit Standards. 
4.2 Internal performance monitoring against PSIAS has been ongoing over the
last few years. However, a more structured internal assessment was
completed in preparation for the External Quality Assessment, scheduled for
later in 2023. Enclosed in Appendix 1 is an Action Plan detailing
recommendations for compliance with PSIAS.   
Follow Up Reviews 
4.3 Internal Audit reports are regularly presented to members detailing not only
findings but also the responses by management to the recommendations with
agreed dates of implementation. Internal Audit will also undertake follow up
Item 6.
Page 39

Page 40

reviews to evidence the effective implementation of these recommendations.
Please see detailed the following completed follow up reviews: 
Health and Social Care Moray - Self-Directed Support (SDS) Financial
Review 
4.4 This audit has reviewed the arrangements for monitoring service users who
receive an SDS direct payment to purchase their own support. This involved
the random selection of a sample of care packages and a check made to
ensure compliance with operating procedures, expenditure incurred by the
service user is in accordance with the agreed budget and support plans, and
surplus funds are recovered from service users where appropriate. It was
noted that a total of 150 adult service users receive an SDS direct payment to
purchase their own support at a cost of approximately £3 million annually. The
Follow Up Report to review the implementation of the agreed
recommendations is given in Appendix 2. Unfortunately, it was found that the
majority of the recommendations had not been implemented. The Service
detailed particular issues regarding staff shortages and revised dates of
implementation have been agreed.   
Health and Social Care Moray - Client Monies
4.5 An audit was undertaken of the processes undertaken by the Community
Care Finance Team in how they administer the corporate bank account. In
addition, a sample of individuals was also selected, and a check was made on
how the Health and Social Care Officer appointed as the named "Corporate
Appointee" manages and supports individuals to access their funds
appropriately. The Adults with Incapacity (Scotland) Act 2000 enables a
Health and Social Care Officer to be appointed by the DWP to have
"Corporate Appointeeship" responsibility for managing the benefits received
by an individual. At the time of the audit, it was found that 59 individuals are
being managed within the "Corporate Apppointeeship" Scheme with a
combined value of £483,000 held within a corporate bank account. The Follow
Up Report to review the implementation of the agreed recommendations is
given in Appendix 3.  The Service detailed that it has not been possible to
implement a number of the recommendations within the previously agreed
timescales. There will therefore be a need to undertake a further follow up
review of this audit and thereafter report progress to a future Audit
Performance and Risk Committee. 
Procurement and Creditor Payments
4.6 An audit was undertaken to review payments made to suppliers of goods and
services. The purpose of the audit was to confirm that effective controls are
operating to ensure all payments are appropriately authorised, accurate and
paid in accordance with financial regulations and agreed terms and
conditions. This audit review is related to testing a sample of transactions
generated under the direction of the Moray Integration Joint Board. Through
the use of computer audit software, a sample of payments was randomly
selected from this period with a value of £1.05 million. The testing undertaken
was developed from the Chartered Institute of Public Finance and
Accountancy’s Audit Programme. The Follow Up Report to review the
implementation of the agreed recommendations is given in Appendix 4. It is
pleasing to report that all recommendations have now been implemented 
Page 40

Page 41

Social Media Accounts
4.7 A follow up review was undertaken of the audit undertaken regarding the use
of Social Media. The scope of the review was to understand which services
use social media websites as a means of communication and how it is
managed. Social media refers to websites and applications, e.g., Facebook
and Twitter that are designed to allow people to share content quickly,
efficiently, and in real time. Officers use social media as a form of
communication across various services. The Follow Up Report confirming the
implementation of the agreed recommendations is given in Appendix 5. 
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Partners in
Care 2022 – 2032”
Internal audit work supports good governance and assists in securing
appropriate systems of internal control. 
(b)  Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications and Mitigation
Audit reports highlight risk implications and contain recommendations for
management to address as a means of mitigating.   
(e) Staffing Implications
No implications directly arising from this report 
(f)   Property
No implications. 
(g)  Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions 
None arising directly from this report. 
(j) Consultations
There have been no direct consultations during the preparation of this
report.  
Page 41

Page 42

6. CONCLUSION 
6.1 This report provides committee with an update on internal audit work
progressed in the latest review period. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/29062023 
Page 42

Page 43

Appendix 1
Moray Council
Internal Audit Section 
1
Recommendations - Internal Audit Section – Public Sector Internal Audit Standards 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Internal Audit governance and operating arrangements comply with the Public Sector Internal Audit Standards. 
5.01 A copy of the Internal Audit
Charter should be issued to all
officers within the Internal Audit
Section. (PSIAS Ref: 1100.8)
Low Yes Further to the
approval of the
Internal Audit
Charter at the
Audit & Scrutiny
Committee on 23
November 2022, a
copy will be
provided to all
officers of the
Internal Audit
Section.   
Audit and
Risk
Manager 
23/11/2022
Item 6.
Page 43

Page 44

Appendix 1
Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.02 In accordance with the Public
Sector Internal Auditing
Standards, Committee Reports
from the Internal Audit Service to
elected members should be from
the Audit and Risk Manager.
(PSIAS Ref: 1100.1/2600.1) 
High Yes   Depute Chief
Exec.
Education,
Communities
&
Organisational
Development 
Immediate
5.03 The Council’s Annual
Governance Statement (AGS) is
prepared by the Audit and Risk
Manager, in addition to providing
an annual opinion report on the
overall adequacy and
effectiveness of the Council’s
framework of governance, risk
management and control.
Medium Yes The Annual
Governance
Statement will be
prepared in future
by the Head of
Governance,
Strategy &
Performance with
the support of the
Business
Head of
Governance,
Strategy &
Performance 
Immediate
Page 44

Page 45

Appendix 1
Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Preparation of the Annual
Governance Statement should
be undertaken by an officer out
with the Internal Audit Section.
(PSIAS Ref:
1100.9/2400.12/2600.1) 
Continuity and
Risk Management
Officer. 
5.04 Consideration should be given to
the development of Assurance
Mapping to aid the preparation of
the Annual Internal Audit
Plan. (PSIAS Ref:
2000.2/2000.10)
Low Yes This issue has
been raised within
the Scottish Local
Authority Chief
Internal Auditors
Group with the
intention of
developing a
consistent
methodology.
Audit and
Risk
Manager 
Ongoing
Page 45

Page 46

Appendix 1
Moray Council
Internal Audit Section 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.05 Findings from follow-up reviews
should be reported to Audit &
Scrutiny Committee on a regular
basis. (PSIAS Ref:  2500.2)
Medium Yes Findings from
follow-up reviews
will be reported
within an Update
Report to Audit &
Scrutiny
Committee on a
regular basis.
Audit and
Risk
Manager
23/11/22 
Page 46

Page 47

Appendix 2
Moray Council
Internal Audit Section 
1
DEPARTMENT: Health and Social Care Moray
SUBJECT:  Self-Directed Support 
REPORT REF: 22'013
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Clear and current policy documents and operational guidelines have been developed for the financial administration of SDS
packages.
5.01 The SDS Direct Payment
guidance and financial monitoring
procedures should be reviewed
and updated on a regular basis.   
Low Yes 30/04/2022 Implemented. Financial Monitoring
Procedures were updated in October 2021 and
SDS Direct Payments Guidance was revised
in April 2022. 
Item 6.
Page 47

Page 48

Appendix 2
Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Financial reviews are being carried out to monitor the usage of SDS funding in accordance with operational guidelines.
5.02 Annual financial reviews should
be undertaken in line with the
direct payment financial
monitoring procedures. 
High Yes 31/01/2022 Not implemented. The review found a backlog
in the Service undertaking annual financial
reviews.  Discussions with the Service noted
there had been multiple staffing changes and
vacancies for a prolonged period. It is hoped
that with a stable staffing position, the
resources are now available for implementing
this recommendation by 31/08/2023.   
5.03 Consideration should be given to
the routine production of reports
from the Care First System which
can be used to detail financial
reviews falling due and allow
management to prioritise
workloads accordingly. The
Medium Yes 31/12/2021 Implemented. Reports are being produced by
the CareFirst system to detail financial reviews
due and their priority. The reports have also
indicated a data cleansing need within
CareFirst which is being undertaken to ensure
data remains accurate.   
Page 48

Page 49

Appendix 2
Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
requirement of manual
spreadsheets should be
minimised wherever possible to
ensure information reference
points come direct from the Care
First system. 
5.04 A risk based approach should be
initiated by management to
prioritise outstanding financial
reviews and work through the
backlog in an order which makes
best use of limited resources. 
High Yes 31/12/2021 Not implemented. The review noted a backlog
remains in the Service undertaking financial
reviews. It was found the service had
developed a prioritisation plan, but due to
resourcing issues, it has not been possible to
implement this recommendation. A revised
implementation date of 31/08/2023 has been
agreed. 
Page 49

Page 50

Appendix 2
Moray Council
Internal Audit Section 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.05 A reminder should be issued to
service users, and approved
payroll providers where
applicable, to inform the Authority
when funds in excess of the
contingency amount are held. This
may assist in the prioritisation of
early financial reviews and
highlight issues for further
investigation. 
High Yes 30/04/2022 Implemented. Assurance has been obtained
from the Service that this has been
undertaken. Further reminders are to be
issued in January 2023 and will be scheduled
annually each January going forward,
incorporated into an annual data check. 
5.06 A review should be undertaken of
all Service Users in regard to the
current balances held within their
SDS bank account. Action should
then be taken to recover excess
funds. 
High Yes 30/04/2022 Not implemented. Significant surpluses were
reclaimed on managed accounts as a result of
obtaining details of all bank balances following
the audit undertaken. The Service commenced
work on a review of unmanaged accounts, but
this has not been completed due to staffing
issues. A revised implementation date of
Page 50

Page 51

Appendix 2
Moray Council
Internal Audit Section 
5
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation 
31/08/2023 has been agreed.   
5.07 In compliance with established
procedures, one-off direct
payments should be subject to a
financial monitoring review 3
months (or in limited
circumstances at another interval)
after the funding has been
distributed to confirm its
appropriate usage. 
Medium Yes 30/04/2022 Not implemented. The Service has detailed
staffing issues as the reason for not
implementing this recommendation. A revised
implementation date of 31/08/2023 has been
agreed. 
5.08 The Service should comply with
the monitoring requirements
detailed within an agreement
between the Council and Service
User for the purchase and
Medium Yes 31/12/2021 Not implemented. The Service has detailed
staffing issues within the SDS Team and
Social Work as the reason for not
implementing this recommendation. While
some details of the purchase have been
obtained, many other conditions in the legal
Page 51

Page 52

Appendix 2
Moray Council
Internal Audit Section 
6
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
adaptation of a mini van.  agreement between the Council and the
Service User have not been evidenced. SDS
Team to liaise with Social Work, and a revised
implementation date of 31/03/2023 has been
agreed. 
5.09 Closing financial reviews of SDS
care packages should be
undertaken in accordance with
agreed procedures. Evidence
should be retained of any
expenditure outwith the agreed
support plan and of the full
discussions held and decisions
made by Social Workers
regarding retrospective
authorisation. 
Medium Yes 31/12/2021 Not implemented. At the end of a direct
payment package monies are returned, but
closing reviews have not been carried out to
confirm monies have been applied
appropriately. The Service has detailed
staffing issues as the reason for not
implementing this recommendation. A revised
implementation date of 31/08/2023 has been
agreed. 
Page 52

Page 53

Appendix 2
Moray Council
Internal Audit Section 
7
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: SDS Funding is only used to support the service user's support plan outcomes and compliance is monitored to ensure public funds
are spend appropriately. 
5.10 Care and Support Plans should be
reviewed annually to ensure the
agreed care is being provided and
continues to meet the service
user's needs. 
High Yes 01/05/2022 Not implemented. The follow-up audit exercise
noted that since the pandemic annual support
plan reviews have not recommenced across all
parts of the Service. Limitations were stated in
resources with staffing vacancies and
workload pressures due to an increased
demand for care, including the requirement to
deal with particularly complex cases and
increasing difficulties in sourcing care. Priority
has been given to support plans for new and
changing care arrangements rather than
routine annual reviews. The newly appointed
Head of Service will review current
procedures. The current status of this
recommendation will be reviewed in the follow-
up audit after 31/08/2023. 
Page 53

Page 54

Appendix 2
Moray Council
Internal Audit Section 
8
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.11 All Social Workers should be
reminded of the requirement to
inform the SDS Team of any
amendment to a Support Plan that
will have a financial change to a
service user's care package.   
High Yes 01/12/2022 Implemented. The SDS Team sends
reminders to Social Work regarding the
requirement to refer support package changes
where there is a financial implication. A recent
reminder to officers was noted on 01/12/2022. 
Key Control: SDS service has effective arrangements in place to monitor support packages and report on performance.
5.12 Consideration should be given to
the development of appropriate
performance monitoring
measures to be reported to
service management on a regular
basis. Given the current backlog of
reviews and consequences of
direct payment accounts not being
Low Yes 30/09/2022 Not implemented. Performance measures for
Health & Social Care as a whole are being
developed using Pentana. Initial work on
developing these measures is being led by the
Performance Team and started in July 2022. A
delay has been experienced due to workload
pressures and the 30/09/2022 target has not
been met. The Performance Team is to
commence engagement with the SDS Team
Page 54

Page 55

Appendix 2
Moray Council
Internal Audit Section 
9
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
scrutinised on a timely schedule, it
may be beneficial for performance
information to be made available
for management to identify any
resourcing issues arising and
assess risks involved. 
on their specific performance measures in
November 2022. The Commissioning
Manager has agreed to a revised
implementation date of 31/03/2023. 
Page 55

Page 56

Page 56

Page 57

Appendix 3
Moray Council
Internal Audit Section 
1
DEPARTMENT: Health & Social Care Moray 
SUBJECT:  Client Monies 
REPORT REF: 22'011
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Clear and current policy documents and operational guidelines have been developed for the financial management of client monies.
5.01 The Procedures for Managing
Service User's Money and
Corporate Appointeeship should
be reviewed and updated and a
subsequent regular cycle of
review maintained. 
Medium Yes 31/10/2022 Not implemented. Procedures have not been
reviewed and updated as intended due to
staffing absence. This will now be prioritised
and a revised implementation date of
30/06/2023 has been agreed. 
Item 6.
Page 57

Page 58

Appendix 3
Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.02 Procedures for the management
of client monies should be
promoted to ensure there is an
awareness of their requirements
by all officers involved in client
finance administration. 
Medium Yes 31/10/2022 Not implemented. As procedures have not
been reviewed per 5.01, the intended
promotion activity after update has not been
undertaken. A revised completion date of
30/06/2023 has been agreed. 
Key Control: Correct formal powers to administer client monies have been obtained. 
5.03 Clarification should be obtained
from Legal Services regarding the
length of time funds must be
retained on behalf of deceased
clients and potential action which
can be taken should the funds not
be claimed within the timeframe. 
Medium Yes 31/10/2022 Implemented. A process is now in place for
active pursual of estate settlement and referral
to National Ultimus Haeres Unit to aid fund
dispersement where applicable.  The balance
held in relation to these funds has significantly
decreased since the audit was undertaken. 
Page 58

Page 59

Appendix 3
Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Consideration should also be
given to holding these funds
separate to the corporate bank
account for increased visibility.   
A separate balance record is being maintained
for increased visibility of deceased client funds
and to record actions taken. 
Key Control: All transactions should be for benefit of the client with justifiable supplier selection, verified to source documentation and in line with
the client's Financial Management Plan. Any cash held is done so securely and with full accounting arrangements. 
5.04 Due to changes in operating
practices a full review of current
cash handling procedures should
be undertaken. The review should
include a risk assessment to
ensure best practices are followed
regarding the safety and security
of both officers and client funds.
Documented procedures should
thereafter be updated to reflect
High Yes 31/07/2022 Not implemented. The topic was initially
referred to Practice Governance Group,
however, the service has decided a full review
of the corporate account is required and a
meeting has been instigated with all relevant
staff. As this will take time and resources to
complete a revised implementation date of
31/07/2023 has been agreed. 
Page 59

Page 60

Appendix 3
Moray Council
Internal Audit Section 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
any agreed changes. 
Key Control: Robust records of fund administration per client are maintained.
5.05 Confirmation of the monthly
reconciliation of the Corporate
bank account to manual records
should be undertaken by
Community Care Finance
management. This should also
include the verification of a 
sample of transactions to source
cumentation. 
High Yes 31/05/2022 Implemented. There is now a monthly
management check of the corporate bank
account reconciliation and a sample of
transactions are independently checked for
validity. The follow-up exercise has resulted in
further enhancements to the management
check being advised such as types of
transactions for increased focus, which will
increase the strength of the scrutiny process. 
Page 60

Page 61

Appendix 4
Moray Council
Internal Audit Section 
1
DEPARTMENT:   Health & Social Care Moray 
SUBJECT:  Procurement and Creditor Payments 
REPORT REF: 23'008
Follow Up Audit Review
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Effective controls in the processing of creditor payments to ensure compliance with Financial Regulations and Procurement
Guidelines   
5.01 A review should be undertaken
across all social care external
providers to ensure that payments
are not made in advance of the
service delivery 
High Yes 15/08/22 Implemented- A review of providers has been
undertaken, and testing noted only one
example where payment had been made
before the service was delivered.  However,
further investigation found that approval had
Item 6.
Page 61

Page 62

Appendix 4
Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
been obtained from the Chief Financial Officer
in accordance with Financial Regulations.  
5.02 Monitoring arrangements within
the Community Care Finance
Team should be amended to
include a requirement to record all
invoices processed for payment 
Medium Yes 31/08/22 Implemented - The monitoring database
recording invoices passed for payment has
been amended to include additional
information on when care has been provided
to service users. 
It was also noted that a revised Standard
Operating Procedures (SOP) had been
prepared but has not been finalised.  The SOP
details requirement for recording information
on the monitoring database. 
5.03 The Community Care Finance
Team should check invoices
received from Care Providers to
ensure the care delivered to each
Medium Yes 31/08/22 Implemented – Invoices are matched to
CareFirst to ensure that the care being billed
for agrees to the support package as detailed
Page 62

Page 63

Appendix 4
Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
service user corresponds to their
individual authorised support
package detailed within CareFirst 
in the system.  Where discrepancies arise,
confirmation is sought from Social Work. 
5.04 Payments should be made to the
agreed Care Provider and not a
sub contracted company 
High Yes 31/08/22 Implemented. - The follow up review has
confirmed that payments are no longer being
made to a third party but to the Care Provider. 
Page 63

Page 64

Page 64

Page 65

Appendix 5
Moray Council
Internal Audit Section 
1
DEPARTMENT: Chief Executive 
SUBJECT:  Social Media 
REPORT REF: 22'012
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: The use of social media to facilitate council activities i.e communications, has adequate controls and monitoring 
5.01 A single guidance document should
be developed for officers in the use of
social media accounts. 
Medium Yes 31/04/2022 Implemented. A Social Media Guidance 
Document has been prepared and is currently
going through an employee consultation
process. 
Item 6.
Page 65

Page 66

Appendix 5
Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.02 The Media and Communications
Section should be informed prior to a
Service setting up a Social Media
Account. 
Medium Yes 31/11/2022 Implemented. Evidence noted of the Media
and Communications Section being informed
of the setting up of new Social Media
Accounts. 
5.03 The Media and Communications
Section should maintain a record of
social media accounts and 
officers authorised to post information
across all Council services.   
Medium Yes 31/11/2022 Implemented. Noted that a record is now
maintained of Council social media accounts
and officers authorised to post information. 
5.04 Consideration should be given that
prior to allowing officers access to a
Council social media account,
training should be undertaken. 
Medium Yes 16/12/2022 Implemented. An E-Learning module is now
available to officers, and in-person sessions
can also be provided when requested. Officers
must complete the E-Learning module before
access is allowed.  
Page 66

Page 67

Appendix 5
Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.05 Further exploration should be
undertaken to the benefits of
introducing additional security
controls available from social media
website providers. 
Medium Yes Ongoing Implemented. Two step authorisation is
required for all Facebook Council accounts. In
addition, a review of other social media
platforms has been completed with the
intention of also requiring a two step
authorisation procedure before access is
allowed.   
Page 67

Page 68

Page 68

Page 69

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 29 JUNE 2023 
SUBJECT: INTERNAL AUDIT SECTION COMPLETED PROJECTS REPORT 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 To provide an update on audit work completed since the last meeting of the
Committee.   
2. RECOMMENDATION 
2.1 The Audit, Performance and Risk Committee is asked to consider and
note this audit update. 
3.  BACKGROUND   
3.1 Public Sector Internal Audit Standards (PSIAS) require the Chief Internal
Auditor to prepare and present reports to the committee on internal audit’s
activity relative to the audit plan and any other relevant matters. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1     In line with the approved internal audit plan, the following reviews were
completed: 
Emergency Planning
4.2 The annual audit plan for 2022/23 provides for an audit review of the Council's
Emergency Planning arrangements. The Civil Contingencies Act 2004 places
a legal obligation upon emergency services and local authorities to assess the
risk of, plan, and exercise for emergencies, such as floods, adverse weather,
pandemic or other emergencies that could have a significant impact on the
community. Effective emergency planning is an essential component of the
Council’s overall governance arrangements to ensure the resilience of all key
services in the event of a major incident. 
4.3  The audit noted a need for updating Emergency Plans in addition to
supporting Policies and Procedures. However, it is appreciated the limited
staffing resources available within the Service. The executive summary and
recommendations for this project are given in Appendix 1.
Item 7.
Page 69

Page 70

Self Directed Support
4.4 A review has been undertaken of the financial monitoring arrangements for
Self-Directed Support (SDS) packages. The Social Care (SDS) (Scotland) Act
2013 came into force in April 2014 and introduced the Self Directed Support
(SDS) term to describe how people can exercise choice and control over the
support or services that allow them to live independently and meet agreed
outcomes. The Act requires all Local Authorities to offer options to individuals
who have been assessed as needing a care service. 
4.5 The scope of this audit was to review systems and procedures for the
following care delivery options: 
• An individual choose their own support but managed by Health & Social
Care Moray. 
• The care provider is arranged by Health & Social Care Moray at the
request of the service user. 
Annual expenditure for these type of care delivery options amounted to
approximately £40 million and £17 million respectively for external and
Health & Social Care Moray care providers. The executive summary and
recommendations for this project are given in Appendix 2. 
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Partners in
Care 2022 – 2032”
Internal audit work supports good governance and assists in securing
appropriate systems of internal control. 
(b)  Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications and Mitigation
Audit reports highlight risk implications and contain recommendations for
management to address as a means of mitigating.   
(e) Staffing Implications
No implications directly arising from this report 
(f)   Property
No implications. 
(g)  Equalities/ Socio Economic Impacts 
No implications.
Page 70

Page 71

(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions 
None arising directly from this report. 
(j) Consultations
There have been no direct consultations during the preparation of this
report. 
6. CONCLUSION 
6.1 This report provides Committee with a summary of findings arising from
audit projects completed during the review period. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor 
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/29062023 
Page 71

Page 72

Page 72

Page 73

Appendix 1 
AUDIT REPORT 23’021
EMERGENCY PLANNING 
Executive Summary  
The annual audit plan for 2022/23 provides for an audit review of the Council's
Emergency Planning arrangements. The Civil Contingencies Act 2004, places a legal
obligation upon emergency services and local authorities to assess the risk of, plan,
and exercise for emergencies, such as floods, severe weather, industrial accident or
other emergencies that could have a significant impact on the community. Effective
emergency planning is an essential component of the Council’s overall governance
arrangements to ensure the resilience of all key services in the event of a major
incident. An Emergency Planning Officer supports Council Services' delivery of
emergency planning arrangements. 
The objective of this audit was to provide assurance over the adequacy and
effectiveness of current controls over emergency planning. The audit scope reviewed
that adequate training, planning and testing systems have been developed to ensure
the Council is prepared in the event of an emergency. However, emergency planning
arrangements cannot exist in isolation as effective business continuity plans are
required to ensure the Council can not only deal with an emergency but also continue
to function and recover effectively afterwards.
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS). 
The audit found significant work has been undertaken to ensure the Council maintains
effective emergency planning arrangements and the ability to respond operationally to
emergency events. This has been achieved despite limited staff resources. The review
highlighted the following key points: 
• The Emergency Planning Policy and Procedures have not been updated since
2014. This document is currently being reviewed and provides guidance to
officers for coordinating action in dealing with an emergency. The Emergency
Planning Policy and Procedures should be updated to reflect current operating
arrangements and staffing structures. 
• Emergency Plans have been developed detailing actions to be undertaken in
the event of an incident. It is appreciated the limited staffing resources
available, however it was found that some plans still need to be reviewed and
updated to reflect the current staffing structures of the Council and partner
organisations. After updating, testing should be undertaken to ensure
effectiveness and highlight any further improvements to Emergency Plans.     
Item 7.
Page 73

Page 74

Appendix 1 
• It was noted the Council maintains a weekly rota of senior managers designated
as Moray Emergency Response Co-Ordinators (MERC) in the event of an
incident. However, it was found that limited training is provided or documented
guidance and instructions to support officers in their duties. It was noted that
work is being carried out to improve guidance available to MERC’s. In addition,
it was also found a need to update the emergency contact details of officers. 
Page 74

Page 75

Appendix 1 
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: The Council’s emergency planning arrangements are fit for purpose  to respond effectively in the event of a major
incident 
5.01 The Emergency Planning Policy
and Procedures should be
updated to reflect current
operating arrangements and
staffing structures.
Medium  Yes  A new Moray
Council
General
Emergency
Plan is in
development /
draft.  Updating
both the
strategic and
operational
requirements of
the Moray
Councils
Emergency
Response
arrangements
and outlining
the
responsibilities
Emergency
Planning
Officer
31/05/2023
Page 75

Page 76

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
of responder
partners.
5.02 Regular meetings should be held
between the Emergency
Planning Officer and the
Business Continuity and Risk
Management Officer to ensure
ongoing alignment of emergency
and business continuity plans. 
High Yes A Closer
working
relationship
will continue
between the
Emergency
Planning
Officer and the
Business
Continuity and
Risk
Management
Officer, to
further develop
alignment of
emergency
planning and
business
continuity
plans.
Emergency
Planning
Officer /
Business
Continuity and
Risk
Management
Officer 
Ongoing
Page 76

Page 77

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.03 Emergency plans should be
updated to reflect current risks,
working practices and staffing
structures of the Council and
partner organisations. 
After updating the emergency
plans, testing should be
undertaken to evidence their
effectiveness and highlight any
areas for further improvement. 
Medium Yes Emergency
Plans are being
updated to
reflect risks, and
strategic and
operational
requirements. 
However this
process requires
commitment
from the heads
of services to
ensure
implementation
of this
recommendation 
Once developed,
a test exercise
schedule will be
developed to
stress test and
learn lessons
and update the
agreed plans. 
Emergency
Planning
Officer
31/12/2024 
Page 77

Page 78

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.04 Further training and documented
guidance should be provided to
Moray Emergency Response
Co-Ordinators (MERC) to
support officers in best practices
to follow in the event of an
emergency incident. 
Medium Yes The Emergency
Planning Officer
has previously
sourced, on a
number of
occasions, free
Scottish
Government
Crisis
Management
training for
officers. This
training is now
being re-run in
May 2023 and all
MERC’s yet to
undertake have
been invited to
attend. The
Emergency
Planning Officer
has also sourced
a MERC
induction
package from a
neighbouring
authority and this
Emergency
Planning
Officer  /
Senior HR
Adviser
31/12/2023
Page 78

Page 79

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
will be developed
along with
Organisational
Development for
future MERC
training delivery. 
New Action
Cards (step by
step) guidance is
in development
for MERC’s to
use at time of
incidents.
5.05 Emergency contact details of the
Moray Emergency Response
Co-Ordinators (MERC) saved
within Sharepoint should be
restricted to only officers that
require access to this
information. 
Medium Yes ICT/Sharepoint
to provide the
Emergency
Planning
Officer with a
list of access
names for
review. The
Emergency
Planning
Officer to
Emergency
Planning
Officer
31/07/2023
Page 79

Page 80

Appendix 1 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
review and
clarify those
that need
requirement
and advise ICT
accordingly.  
5.06 An Annual Report should be
provided to elected members
detailing the work undertaken
and planned within emergency
planning. 
Medium Yes An Annual
Emergency
Planning
Report will be
submitted to
members.
Consultancy
Manager     
31/03/2024
5.07 A review of the hyperlinks
contained within emergency
planning webpages should be
undertaken to ensure they
connect to the intended
document or website. 
Medium Yes The Emergency
Planning Officer
in Liaison with
the Senior
Communication
s Officer is
making
arrangements
to progress
updating of
relevant
hyperlinks.
Emergency
Planning
Officer/ Senior
Comms. 
Officer  
30/08/2023 
Page 80

Page 81

Appendix 2 
1
AUDIT REPORT 23’025
SELF DIRECTED SUPPORT   
Executive Summary 
The Internal Audit Plan for the 2022/23 year provides for a review of the financial
monitoring arrangements for Self-Directed Support (SDS) packages of adults as part
of the coverage of Health & Social Care Moray activities. The Social Care (SDS)
(Scotland) Act 2013 came into force in April 2014 and introduced the SDS term to
describe how individuals can exercise choice and control over the support or services
that allow them to live independently and meet agreed outcomes. The Act requires all
Local Authorities to offer the following 4 Options to individuals who have been
assessed as needing a care service: 
• option 1 - a direct payment, which is a payment to a person or third party to
purchase their own support
• option 2 - the person directs the available support
• option 3 - the local council arranges the support
• option 4 - a mix of the above 
The scope of the audit was to review systems and procedures in the delivery and
management of adult social care provided under Options 2 and 3 of the SDS Scheme.
This included examination of the processes to support individuals in their preferred
care delivery option, contractual relationships with care providers, financial
management and monitoring of individual care packages. Annual expenditure for
individuals in receipt of SDS Option 2 and & 3 care packages amounted to
approximately £40 million and £17 million respectively for external and internal care
providers.     
The audit was carried out in accordance with the Public Sector Internal Audit
Standards (PSIAS).  
The key areas identified for management attention include the following :- 
• The Social Care (SDS) (Scotland) Act 2013 requires Councils to provide
individuals and their families with information and support to decide on a service
user's preferred SDS care delivery option. A review of the support packages of
individuals using care services found limited evidence of discussions between
social workers and service users/families regarding the range of SDS care
delivery options. A clear audit trail should be maintained to evidence the
discussions held with service users in determining their care package.   
• It was noted that where care is delivered through SDS Option 2, a tripartite
agreement should be agreed to detail the care provided, signed by the provider,
Council, and the supported person. From a random sample of individuals using
care services, it was found the majority had no tripartite agreement in place to
Item 7.
Page 81

Page 82

Appendix 2 
2
formalise their care arrangements. The audit found, through a documentation
review and discussions with social workers, examples where no referral had
been made to the SDS Team to finalise a tripartite agreement or where the
process still needed to be completed. The current workload pressures within
the Service are appreciated. 
• The Council does not charge individuals receiving a day care service. A review
of practices within other Local Authorities notes charging policies where
individuals contribute to the cost of receiving a day care service. The Council's
charging policy should be reviewed regarding day care and a decision should
be made as to whether a charge should be levied for the service in future.   
• Audit testing noted examples where supporting documentation concerning an
individual's care package was either not recorded or could not be found within
the CareFirst System. In addition, changes to care packages were noted
regarding the care delivered or the provider where again this was not reflected
within the CareFirst System. CareFirst is the primary database that records and
manages social care cases within Health & Social Care Moray. The limitations
of the CareFirst System are appreciated, highlighted in a separate audit review
in 2022/23. The Service has committed to investigate a replacement to the
current recording databases used within Health & Social Care Moray.   
Page 82

Page 83

Appendix 2 
3
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Effective controls operate in the management and recording arrangements for the delivery of SDS Options 2 and 3
care packages   
5.01 In accordance with SDS
Regulations, evidence should
be maintained to document
the discussions held by social
workers regarding the various
care delivery options
discussed with the individual
using care services. 
High Yes Discussions
will be held by
Social Workers
as part of the
assessment
and recorded
as part of the
Support Plan
on Care First.
Team
Managers will
be accountable
to ensure
implementatio
n and delivery
through
supervision,
which will be
monitored and
reviewed at
Chief Social
Work Officer /
Head of
Service  
30/09/2023
Page 83

Page 84

Appendix 2 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Practice
Governance
Board monthly.  
5.02 Documented procedures
should be developed to
support social workers and
individuals using care
services in the selecting of
SDS care delivery options. 
High Yes Relevant
Guidance will
be developed
and a process
map will be
distributed to
all Social
Workers. This
will be
monitored at
Practice
Governance
Board monthly. 
Chief Social
Work Officer /
Head of
Service  
31/03/2024
5.03 An annual reference
document detailing a
breakdown of the rates paid to
care providers should be
provided to all relevant
officers to assist in budgetary
High Yes A document
containing all
providers and
costs will be
issued to all
relevant
Provider
Services
Manager
30/06/2023
Page 84

Page 85

Appendix 2 
5
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
planning and the accurate
preparation of an individual's
support package.   
officers.
A process to
maintain and
update the
document
going forward
will be
developed and
monitored
through the
Practice
Governance
Board on a
regular basis. 
5.04 All officers should be
reminded to update the
CareFirst System to ensure
the database is up-to-date
and accurate for each
individual using care services. 
High Yes Discussions
will be held by
Social Workers
as part of the
assessment
and recorded
in the Support
Plan on Care
First. Team
Chief Social
Work Officer /
Head of
Service  
30/09/2023
Page 85

Page 86

Appendix 2 
6
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Managers will
be accountable
to ensure
implementatio
n and delivery
through
supervision,
which will be
monitored and
reviewed at
Practice
Governance
Board monthly.  
5.05 A tripartite agreement
between the individual using
the care service, Council and
care provider should be
agreed for all SDS Option 2
care packages. 
Medium Yes Social Workers
will refer to the
SDS Team
when setting
up a new
package and
this will be
reviewed and
monitored
through
Chief Social
Work Officer /
Head of
Service  
30/09/2024
Page 86

Page 87

Appendix 2 
7
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
supervision.
SDS Team to
then put in
place a
Tripartite
Agreement. 
This will be
monitored and
reviewed at the
Practice
Governance
Board
regularly. 
5.06 A contractual agreement
detailing service delivery and
costs should be agreed with
the 3 providers of day care
services noted within the
findings. 
High Yes Clarification
will be given
from SDS
Team and
Social Work as
to the direction
regarding
contractual
agreement. 
Provider
Services
Manager
31/03/2024
Page 87

Page 88

Appendix 2 
8
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.07 Annual support plan reviews
of individuals in receipt of
SDS Option 2 and 3 care
packages should be
undertaken in accordance
with agreed procedures. 
High Yes Work with
Social Work to
develop a
strategy to
ensure all
reviews are
completed on
time.
There is a
significant
capacity issue
across Social
Work.
This will be
monitored and
reviewed
regularly
through the
Practice
Governance
Board. 
Chief Social
Work Officer /
Head of
Service  
30/09/2024
Page 88

Page 89

Appendix 2 
9
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.08 Consideration should be
given for management to
undertake regular reviews of
the accuracy and recording of
the checks completed to
ensure the accuracy of
payments made to care
providers. 
Medium Yes Continuous
audit to be
implemented
through
Community
Care Finance.
Interim
Community
Care Finance
Officer
30/09/2023
5.09 The Council's charging policy
should be reviewed in regard
to day care and a decision
made as to whether a charge
should be levied for the
service in the future. 
High Yes Review the
Moray Council
charging policy
to allow the IJB
to make
recommendati
ons regarding
future
iterations. 
Interim Chief
Finance
Officer (MIJB) 
30/09/2023
5.10 A review of arrangements
regarding the authorisation of
individual care packages
should be undertaken.
Medium Yes Review the
current
authorisation
practice in line
with financial
Chief Social
Work Officer /
Head of
Service  
31/08/2023
Page 89

Page 90

Appendix 2 
10 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Thereafter, authorisation
requirements should be
documented and
communicated to all
appropriate officers.   
regulations.
Develop a
process map
highlighting
authorisation
levels for all
Social
Workers.
Monitor and
review through
the Practice
Governance
Board. 
Page 90

Page 91

REPORT TO:   MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE                             
AND RISK COMMITTEE ON 29 JUNE 2023 
SUBJECT:  STRATEGIC RISK REGISTER – JUNE 2023 
BY:   CHIEF OFFICER 
1.  REASON FOR REPORT 
1.1  To provide an overview of the current strategic risks, along with a summary of
actions which are in place to mitigate those risks, updated June 2023. 
2.  RECOMMENDATION 
2.1  It is recommended that the Audit, Performance and Risk Committee
consider and note the Strategic Risk Register included in APPENDIX 1.    
3.  BACKGROUND 
3.1  The strategic risk register is reviewed regularly by the Senior Management
Team as part of a robust risk monitoring framework, to identify, assess and
prioritise risks related to the delivery of services in relation to delegated
functions, particularly any which are likely to affect the delivery of the Strategic
Plan. 
3.2  The Moray Integration Joint Board (MIJB) Strategic Risk Register is attached
to this report at APPENDIX 1 and sets out the inherent risks being faced by
the MIJB, together with a current assessment on the level of the risks and
mitigating actions being taken to reduce the impact of the risks.  This report is
presented to Audit, Performance and Risk Committee for their oversight and
comment. Any changes made to the risk register since it was last presented to
the Committee are highlighted using red text. 
3.3  Risk scores are weighted, based on assessment according to their likelihood
and corresponding impact, as per Section 5 of the MIJB Risk Policy.   
3.4  The Strategic Risks received an initial review to ensure they align to the
Partners in Care 2022-2032 strategic plan which was agreed at MIJB on 24
November 2022 (para 14 of the minute refers). 
Item 8.
Page 91

Page 92

4.  KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1  The Risk Management Framework review was completed and outcome was
approved by the Board on 25 June 2020 (para 9 of the minute refers). The
approved Risk Appetite Statements have been included in APPENDIX 1. 
4.2  The challenge to return to a new ‘business as usual’ from the Covid-19
pandemic continues.  
4.3  The senior leadership teams continually consider the appetite for risk whilst
planning and effecting transformational change and redesign, cognisant of the
significant financial challenges for the financial year 2023/24.  
4.4  Work continues across teams to ensure the Risk Register is updated in the
timescales dictated by the criteria. Work continues to support teams with this
continuous improvement and review. 
4.5 A review of our governance structures across the system has commenced, as
we recover from the adaptations made to many reporting structures during the
pandemic. During 2023/24 the partnership will also be focusing on the
structures including the delegation of Children’s Services to MIJB. 
4.6 The continued safe delivery of services is a priority and as such, dedicated
management time is being directed to support oversight of operational risks. 
The Grampian Operational Escalation System (GOPES) continues to be
utilised to assist in the identification of pressure points across the whole
system so that they can be addressed and prioritised appropriately. These
principals continue to be revisited across the system in Grampian.    
4.7  Recruitment and retention continues to provide challenges across all
disciplines. The Moray Health and Social Care Workforce Plan was approved
by MIJB on 29 Sep 2022 (para 12 of the minute refers). Over the next three
years, the workforce plan will focus on the five key areas known as ‘pillars’;
they include, Plan, Attract, Train, Employ and Nurture staff. A report
discussing the challenges and plans of Recruitment and Retention was
presented to MIJB on 26 January 2023 (para 13 of the minute refers). 
4.8   The possibility of planned power outages continues to be a focus for Civil
Contingency groups and Business Continuity Planning continues. Additional
support has also been provided by HSCM to assist Primary Care Contractors
with their planning. Further work is now being carried out to test the resilience
of hospital sites with back up generation power only.  
4.9  There continues to be significant financial risk in the system.  The 2022-23
final unaudited accounts are presented to the Audit, Performance and Risk
Committee and MIJB on 29 June 2023. 
4.10 There continues to be a significant number of hours per week of unmet need
for care at home, with little change in these figures this year. Regular meetings
and action plans continue to take place to support teams. 
Page 92

Page 93

4.11 The Strategic Risk Register will continue to be updated to ensure that it
reflects any potential risks to realise the vision set out in our Strategic Plan.    
5.  SUMMARY OF IMPLICATIONS  
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
The MIJB requires effective governance arrangements for those services
and functions delegated to it and Risk Management systems are integral
to this. 
(b)  Policy and Legal 
As set out in the terms of reference, the Board has responsibility to
provide assurance of the adequacy of the risk management framework. 
There are no legal implications arising from this report. 
(c)     Financial implications 
There are no direct financial implications arising from this report however
the Board should note the failure to manage risks effectively could have
a financial impact for the MIJB. 
(d)    Risk Implications and Mitigation 
This report forms part of the governance arrangements for identifying
and managing strategic risks of the MIJB.  The risks are outlined in the
body of the report in section 4. 
(e) Staffing Implications 
There are no additional staffing implications arising from this report.   
(f) Property 
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact 
An Equalities Impact Assessment is not required because there are no
service, policy or organisational changes being proposed. 
(h) Climate Change and Biodiversity Impacts 
There are no impacts arising from this report. 
(i) Directions 
None arising from this report. 
(j)  Consultations 
Consultation on this report has taken place with the Senior Management
Team. 
Page 93

Page 94

6.  CONCLUSION 
6.1  This report and appendices contains proposed risk appetite statements
that, when approved, will underpin the MIJB approach to strategic
decision making.   
6.2  The report outlines the current position and recommends the Committee
note the revised and updated version of the Strategic Risk Register. 
Author of Report:    Sonya Duncan, Corporate Manager 
Background Papers:  held by HSCM 
Ref:   
Page 94

Page 95

Appendix 1 
HEALTH AND SOCIAL CARE MORAY STRATEGIC RISK REGISTER 
AS AT JUNE 2023 
Item 8.
Page 95

Page 96

Appendix 1 
RISK SUMMARY 
1. The Moray Integration Joint Board (MIJB) does not function as set out within the Integration Scheme, Strategic Plan and in-line
with Standing Orders and fails to deliver its objectives or expected outcomes.  
2. There is a risk of MIJB financial failure in that the demand for services outstripping available financial resources.  Financial
pressures being experienced by the funding Partners will directly impact on decision making and prioritisation of MIJB.
3. Inability to recruit and retain qualified and experienced staff to provide safe care whilst ensuring staff are fully able to manage
changes resulting from integration.
4. Inability to demonstrate effective governance and effective communication and engagement with stakeholders.
5. Inability to cope with unforeseen external emergencies or incidents as a result of inadequate emergency and resilience planning.
6. Risk to MIJB decisions resulting in litigation/judicial review.  Expectations from external inspections are not met.
7. Inability to achieve progress in relation to national Health and Wellbeing Outcomes.  Performance falls below acceptable level.
8. Inability to progress with delivery of Strategic Objectives and Transformation projects as a result of inability to resolve data sharing
and data security requirements.
9. Requirements for support services are not prioritised by NHS Grampian and Moray Council. 
RISK RATING LOW  MEDIUM HIGH  VERY HIGH
RISK MOVEMENT  DECREASE NO CHANGE INCREASE 
The process for managing risk is documented out with the MIJB Risk Policy. 
Page 96

Page 97

Appendix 1 
Description of
Risk: 
Regulatory
The Integration Joint Board (IJB) does not function as set out within the Integration Scheme, Strategic Plan and
Scheme of Administration and fails to deliver its objectives or expected outcomes.  
Lead: Chief Officer
Risk Rating:  Low/ medium/ high/ very high  MEDIUM
Risk Movement:  Increase/ decrease/ no change  NO CHANGE
Rationale for Risk
Rating: 
The strategic plan “Partners in Care 2019-2029” was revised and presented as “Partners in Care 2022 to 2032”, this was
approved by MIJB in November 2022.  
Membership of IJB committees recently changed due to the elections in May.  An amendment to the Scheme to increase
membership by one from each of the partner organisations was ratified in March 2022 by the Scottish Government
following due process and approval by Moray Council and NHS Grampian Board.
During the initial Covid 19 response, normal business was suspended and emergency arrangements were implemented. 
IJB, CCG and APR meetings restarted during August 2020.  Weekly meetings were instigated with Chair/Vice Chair and
Chief Officer and these continue.  A delivery plan for the new Strategic Plan “Partners in Care” 2022-32 will be presented
Spring 2023.
Rationale for Risk
Appetite: 
The Board, staff and providers across Moray are all committed to ensuring high standards of clinical care & governance
through operational policies.  Innovation and new ways of working may mean traditional regulations do not exist, or are
contradictory. 
We will only take regulatory risks knowingly, following consultation with the relevant regulatory body and where we have
clear risk mitigation in place. 
Controls: • Integration Scheme.
• Strategic Plan “Partners in Care” 2022-32
• Governance arrangements formally documented and approved by MIJB January 2021.
• Agreed risk appetite statement.
• Performance reporting mechanisms.
• Consultation with legal representative for all reports to committees and attendance at committee for key reports.
• Standing orders have been reissued to all members
Mitigating
Actions: 
Induction sessions were held for new IJB members after May elections. Further sessions will be arranged for recent
appointees.
IJB member briefings are held regularly as development sessions. 
1
Page 97

Page 98

Appendix 1 
Conduct and Standards training held for IJB Members in June 2022 provided by Legal Services.
SMT regular meetings and directing managers and teams to focus on priorities. 
Regular development sessions held with IJB and System Leadership Group
Strategic Plan and locality management structure is in place. The work that has been progressed through the Covid19
response has escalated developments in some areas as a matter of priority.  This has been achieved through
collaborative working with partner organisations and the third sector. 
Assurances: • Audit, Performance and Risk Committee oversight and scrutiny.
• Internal Audit function and Reporting
• Reporting to Board.
• The Moray Transformation Board has recently recommenced and will support an oversight of planned business
across HSCM.
Gaps in
assurance:
The new strategic delivery plan and will incorporate the work being taken forward for Self-Directed support, Hospital at
Home and Locality Planning. 
Current
performance:
The Scheme of Administration is reported when any changes are required.  
Legal advisors are currently working on the requirements to the integration scheme in relation to the proposed The
integrated scheme of delegation of Children’s and Families and Justice Services was presented and accepted by MIJB
on 26th January 2023.
The Governance Framework was approved by IJB 28 January 2021. Re-appointment of Standards Officer agreed by
IJB 31 March 2022.
Members Handbook has been updated and circulated to all members in June 2022.
Comments: Strategic Planning and Commissioning Group approved the generic Terms of Reference and Chairs of the
transformation boards at the meeting on 19 December 2019. These groups have now recently recommenced following
the pause during the Covid19 response. The Interim Strategy and Planning Lead is now taking this forward and
prioritising and focusing on strategic planning and priorities over the short and longer term. 
Page 98

Page 99

Appendix 1 
2
Description of
Risk: 
Financial
There is a risk of MIJB financial failure in that the demand for services outstrips available financial resources.  Financial
pressures being experienced both by the funding Partners and Community Planning Partners will directly impact on
decision making and prioritisation of MIJB.
Lead: Chief Officer/Chief Financial Officer
Risk Rating:  Low/ medium/ high/ very high VERY HIGH
Risk Movement:  Increase/ decrease/ no change INCREASING
Rationale for Risk
Rating: 
The 2021/22 and 2022/23 settlement saw additional investment for health and social care that was passed through to the
MIJB and in 2023/24 saw funding for recurring commitments. There remains a significant pressure due to the recurring
core overspend, since most of the new investment related to new commitments. 
Financial settlements are set to continue on a one year only basis, which does not support sound financial planning.  
In addition, many uncertainties have arisen relating to the carried forward ear marked reserves with the clawback of the
Covid reserve and reduction of the PSIF funding in 2022/23 as well as other funding being looked at.  The impact of which
will be to reduce the level of ear marked reserves in the MIJB. 
The Revenue Budget 2023/24 was approved by MIJB on 30 March 2023 as a balanced budget.  A significant ambitious
savings plan of £4.1 million was approved and achieved.  Additional Scottish Government funding was provided again
for 2023/24, this is to meet additional recurring policy commitments in respect of adult social care pay uplift for externally
provided services and free personal and nursing care rates.  
The update medium Term Financial Framework was presented as part of the budget papers on the 30th March 2023 this
will be further reviewed during the 2023/24 year to ensure alignment with the recently reviewed Strategic Plan and for the
delegation of Childrens Services and Criminal Justice is planned to be presented to MIJB by 30 September 2023.
Rationale for Risk
Appetite: 
The Board recognises the financial constraints all partners are working within. While we are cautious and open about
accepting financial risks this will be done: 
• Where a clear business case or rationale exists for exposing ourselves to the financial risk 
• Where we can protect the long term sustainability of health & social care in Moray   
Whilst we are now officially in the Covid-19 recovery and transformation stage there has been no additional change in
the pressures felt by the system.
Controls: There is an interim arrangement for CFO cover from Moray Council. Permanent recruitment efforts have not been
successful. The Chief Officer is working with both the Council and NHS Finance Leads to secure a longer term interim
arrangement. 
The CFO and Senior Management Team have worked together to address further savings which were approved by the
Board as part of the budget setting procedures for 2023/24.  This will be a focus of continuous review to ensure any
Page 99

Page 100

Appendix 1 
investment is made taking cognisance of existing budget pressures.  A revised Financial Framework was presented to
the MIJB on 30 March 2023, and a further review will take place by 30 September 2023. The Senior Management
Team will continue to consider and plan for the financial challenges for 2024/25 and beyond.
Mitigating
Actions: 
Risk remains of the challenge that the MIJB can deliver transformation and efficiencies at the pace required whilst dealing
with the emerging financial pressures.    
Financial information is reported regularly to both the MIJB, Senior Management Team and System Leadership Group. 
The Chief Officer and Chief Financial Officer (CFO) continue to regularly engage in finance discussions with key
personnel of both NHS Grampian and Moray Council.   
Chief Officer and CFO will continue to engage with the partner organisations in respect of the financial position throughout
the year. Cross partnership performance meetings are in with partner CEOs, Finance Directors and the Chair/Vice Chair
of the MIJB. 
Assurances: MIJB oversight and scrutiny of budget.  Reporting through MIJB, NHS Grampian Board and Moray Council.
Gaps in
assurance:
None known
Current
performance:
An overspend of £1,454,162 1,297,158 as at December 2023 was reported to the IJB on 30 March 2023 at 30 Sept 2022. 
Comments: Senior managers continue to work with Chief Officer and Chief Financial Officer to address the continuing financial
challenge, continuing to seek efficiencies and opportunities for real transformation as we look to make efficient and
effective investment in services that are truly transformational. There are additional pressures from the cost of living
crisis, increasing energy bills, inflation and staff pay awards. 
Page 100

Page 101

Appendix 1 
3
Description of
Risk: 
Human Resources
(People):
Inability to recruit and retain qualified and experienced staff to provide and maintain sustainable, safe care, whilst
ensuring staff are fully able to manage change resulting from response to external factors such as the impact of Covid
and the actions that arose from the recommendations from the Independent Review of Adult Social Care 2021.
Lead: Chief Officer
Risk Rating:  Low/ medium/ high/ very high HIGH
Risk Movement:  Increase/ decrease/ no change NO CHANGE
Rationale for Risk
Rating: 
There continues to be issues with recruitment to front line services that require specific skills and experience.  This has
been the case for some time now and continues to place pressure on existing staff.  Allied Health Professions, Social
Work and Nursing are some of the particular areas experiencing difficulties with obtaining people with the appropriate
skills and training. Care at Home staffing levels are pressured for Internal services and externally with local providers all
experiencing the same difficulties. 
There are also impacts on recruitment of Dentists and other graduates arising from Covid as the number graduating has
reduced during the period.
The various impacts of Covid-19 has  placed a significant strain on the Partnerships resources across frontline and
support functions and this has resulted in delays for the progress of projects relating to the achievement of strategic
objectives.  HSCM continues to review the large number of fixed term and seconded posts. This will continue as temporary
contracts conclude. It is hoped that this will improve some of the instability teams felt during the pandemic response. This
will also allow consideration of post redesign, service needs and potential financial savings. This will continue to be
reviewed by the Senior Management Team.
Care Homes in Moray continue to face difficulties with recruitment and retention of staff.  Efforts are being made to provide
support but the situation remains challenging. 
The transition from EU membership has not presented any specific concerns for workforce and this will continue to be
monitored. 
The impact of forthcoming budget allocations and the withdrawal of all Covid funding will also mean that HSCM will face
some challenging decisions in 2023.
The impact of budgetary decisions by the Council in relation to reducing staffing levels has reduced levels of support
provided in some key areas for Health and Social Care Moray (HSCM), such as ICT, HR, Legal and design.  
The lack of suitable housing for Health and Social Care staff has resulted in people not being able to take up posts in
Moray. 
Rationale for Risk
Appetite:
Safety risks that could result in harm to service users, staff or the public are inherent in Health & Social Care services.
The safety of individuals is paramount therefore standards of safety management and clinical care have to be high, and
the Board will continue to seek assurances this is the case. 
Page 101

Page 102

Appendix 1 
The Board’s ambition is for health & social care to be people centred. This means supporting people in decision making
about their own health & care, which may expose individuals to higher risk where they make an informed decision. 
The Board will also seek to balance individual safety risks with collective safety risks to the community. 
Controls: Management structure in place with updates reported to the MIJB. 
Organisational Development plan in place and Workforce Plans are being updated to align to the new strategic plan. 
Continued activity to address specific recruitment and retention issues.   
Management competencies continue to be developed through Kings Fund training although this was suspended due to
Covid19. A 2 day event was held on 16/17 May 2023, attended by the Senior Management Team as part of a Grampian
wide event.
Communications & Engagement Strategy was approved in November 2019 and continues.
Council and NHS performance systems in operation with HSCM reporting being further developed and information
relating to vacancies, turnover and staff absences is integral to this.  
Managers are highlighting any areas of concern and where appropriate this is identified in operational risk registers.
HSCM services have commenced weekly reporting of workforce sit reps for Senior Management Team oversight
highlighting vacancies, annual leave, sickness absence and Covid impacts so that issues can be identified and
assessed quickly.  
Moray Council are carrying out a study of accommodation needs, including people working in the Health and Care
sector.
Mitigating
Actions: 
System re-design and transformation.  
Organisational Development Plan and Workforce plan were updated and approved by MIJB in November 2019. The
updated Workforce plan has been submitted to Scottish Government and comments were received by the HSCP in
October 2022. These are currently being worked through.  These plans are core documents for the Workforce Forum
which has recently re-commenced following a temporary suspension during the first quarter of this year due to Covid
impact. 
Staff Wellbeing is a key focus and there are many initiatives being made available to all staff including training, support,
information and access to activities. 
Locality Managers are developing the Multi-disciplinary teams in their areas and some project officer support has been
provided to develop the locality planning model across Moray.
Lead Managers are involved in regional and national initiatives to ensure all learning is adopted to improve this position.
Lead Managers and Professional Leads are linked to University Planning for intakes and programmes for future
workforce development.
Page 102

Page 103

Appendix 1 
Assurances: Operational oversight by Moray Workforce Forum has resumed and will report to MIJB in accordance with the agreed
Governance framework.
The HSCM Response Group was in place over the whole period of the Covid19 pandemic providing focussed
leadership around emerging issues and resolving them.  This group stood up again in April and is meeting daily whilst
the system is pressured, this will be reviewed as the situation evolves.  The Heads of Service are co-ordinating and
escalate to SMT where necessary. These meetings have been increased as service needs dictate.
Gaps in
assurance:
Further work required to develop workforce plans to reflect strategic plan implementation programmes.
Current
performance:
The iMatter survey results for 2022 were received by managers for review and action plans.  Preparatory work has
commenced on the plans for iMatter 2023/24. 
Discussions are underway with HR in both Council and NHS to develop access to appropriate HR information at a
summarised level to facilitate the necessary workforce planning and subsequent monitoring of plans. 
There continues to be a need for more streamlining in recruitment processes as the delay in approval to recruit to having
a member of staff available is in excess of 8 weeks. 
There is also a lack of suitable applicants for various posts which is impacting on ability to appoint for some roles. 
Comments: Staffing issues are owned by the Systems Leadership Group who will work collaboratively across the system to seek
opportunities to make jobs more attractive where it has proved difficult to recruit in the past.   
For some professions there is a potential risk that staff move from one position to a new position within HSCM will just
move the vacancy to elsewhere in the system, so Senior Management Team are aware of this risk and taking it into
account in considerations for vacancies. This needs to be considered when fixed term contracts and secondments are
planned, consideration needs to be given to the whole of HSCM and not services in isolation. Many of our staff may have
transferrable skills and experience. 
The continuing system issues and lack of available beds may mean operations cannot be scheduled to reduce the backlog
and key staff may not have the necessary time in surgery to maintain essential skills.  This in turn may add to the staff
retention issues within certain specialties. 
Page 103

Page 104

Appendix 1 
4
Description of
Risk: 
Reputation:
Inability to demonstrate effective governance and effective communication and engagement with stakeholders. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high MEDIUM
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Locality planning assessed as medium in relation to ability to work at the pace required and current workforce capacity. 
Performance framework to be further developed from a planning perspective to show the links through operational
service delivery to strategic objectives. 
Recent engagement with individuals representing their communities or third sector organisations in a variety of forums
is highlighting that problems with their capacity to fulfil our needs so more co-ordination and clearer focus is required to
ensure that the communication, engagement and outcomes are meeting identified needs.
Rationale for Risk
Appetite:
The Board is cautious but open about risks that could damage relationships with different stakeholders. It recognises
many of our aspirations depend on effective collaboration, coproduction and partnership working with a range of
stakeholders. The appetite also recognises that while the aspiration is to be a co-operative partner, some partners will
not be able to move at the same pace as us all the time. 
We will seek to protect relationships in the long term and will not set out to antagonise stakeholders deliberately. For
example, we must not be seen to exclude or prevent participation in the design of services where there is an appetite to
do this.   
We must be mindful that repairing relationships is easier when there is already a well of goodwill to draw on, and that
further damage to an already damaged relationship will not be conducive to good long term outcomes. 
Controls: Governance Framework approved by IJB January 2021
Communication and Engagement Strategy approved November 2019
Annual Governance statement produced as part of the Annual Accounts 2021/22 and submitted to External Audit. The
unaudited accounts and governance statement for 2022/23 will be presented to MIJB June 2023 and then the audited
accounts will return to committee in September 2023 for agreement.
Annual Performance Report for 2021/22 was published in November 2022.
Performance reporting mechanisms in place and being further developed through performance support team, home first
group and system leadership team.
Page 104

Page 105

Appendix 1 
Community engagement in place for key projects areas such as Forres, Keith and Lossiemouth with information being
made available to stakeholders and the wider public via HSCM website.
Participation of stakeholders in a variety of meetings such as Home First project, carer strategy, Strategic, Planning and
Commissioning groups.
Mitigating
Actions: 
Schedule of Committee meetings and development days in place and implemented. 
Good working relationship established with Audit Scotland, the MIJB’s appointed external auditors since 2016/17.
Discussions at leadership meetings to ensure all standards are being met around Public Sector Equality Duty and
published where appropriate. There is a new programme of training to ensure all policies are Equalities Impact Assessed
and the findings are published. The SMT are currently considering how any proposed service changes consider the PSED
as part of the consultation process. 
Annual Performance Report for 2022/23 will be published in July 2023 after being presented to the IJB in June 2023.
Social media is actively used as a method of engaging with the public, with short videos focussing on particular
services being trialled. 
SMT have considered the existing arrangements for engagement with stakeholders and work is being undertaken to
align our framework with the Scottish Government “Planning with people guidance” and ensure that mechanisms are in
place across services to evidence and evaluate their impact.
Assurances: Oversight and scrutiny by Clinical and Care Governance Committee, Audit Performance and Risk Committee and
MIJB.  
Summary reports of minutes of MIJB meetings are submitted to Council committee and NHS Board.
Gaps in
assurance:
Progress on implementation of the Communication and Engagement Strategy has been impacted by the Covid 19. 
Due to the impact of COVID and requirement for social distancing the normal mechanism for engagement were not all
available.  More use is being made of social media and Microsoft teams and other options and methods for
engagement with staff are being used via NHSG such as videos on YouTube and one question surveys. 
Going forward there may be more opportunity for face to face meetings to take place again but it should be considered
that this will not be beneficial for all. A Public Engagement and Communications Officer is currently being recruited to.
This work stream will rapidly restart as a priority.
Current
performance:
Communications Strategy was reviewed approved by IJB November 2019.
Annual Performance Report 2021/22 published November 2022.  Audited Accounts for 2022/23 were audited and
approved in March 2023 and are now published. 
Due to Covid19 there have been increased levels of briefings to staff, the public and Chair/Vice Chair of MIJB with a
focus on the key elements of the response.  
Page 105

Page 106

Appendix 1 
Comments: A communication cell was established as part of the Local Resilience Partnership Covid and storms response with
representation from Councils, HSCP and NHSG.  This was led by Aberdeen City Council and was an example of the
collaborative working that took place.  This forum provides assurance that messages to all stakeholders are consistent.   
There has been representation from the Home first project at the Wellbeing forum to facilitate sharing of information
and seeking views. 
Page 106

Page 107

Appendix 1 
5
Description of
Risk: 
Environmental:
Inability to cope with unforeseen external emergencies or incidents as a result of inadequate emergency and resilience
planning. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
As a result of the Covid 19 response, progress was made in a number of areas.  SMOC information is updated, control
room guidance updated and expanded, control centre protocols were implemented and remain in place and management
teams have responded in an agile, responsive and collaborative way under very challenging conditions. 
Teams continue to do their best but there are areas where they still feeling overwhelmed and service delivery is
challenging. 
With effect from March 2021 MIJB is defined as a Category 1 responder under the Civil Contingencies (Scotland) Act
and there are additional requirements for preparedness that is being taken forward in partnership with NHSG and Moray
Council emergency planners.
Rationale for Risk
Appetite:
The MIJB understand the requirement to meet the statutory obligations set out within the Civil Contingencies Act and
the Category 1 status applied in March 2021, and work with partner organisations to meet these obligations.
Controls: Winter Preparedness Plan was updated (but not tested as in previous years) alongside NHSG plans as NHSG
implemented their crisis management framework which required participation of partners at Daily System Connect
meetings to discuss and prioritise resource to address issues with system flow.
HSCM Civil Contingencies group established and meeting regularly to address priority subjects.
NHS Grampian Resilience Standards Action Plan approved (3 year).
Business Continuity Plans are now updated for most services and this review continues across HSCM.
Knowledge of critical functions and ability to respond quickly and effectively has been in evidence during incidents such
as Gas outages in Keith (January and February 2021) and Covid response, Storms (Arwen, Malik and Corrie) – debriefs
carried out and learning identified.
A Resilience Newsletter started in December 2022 to ensure all staff receive some personal resilience information
together with resources for teams to plan.
Regular updates to SMT and SLG regarding potential power outages across the country. Additional sessions delivered
to Primary Care Contractors to assist with their Business Continuity Planning around power outages.
Regular system wide meetings to discuss potential Industrial Action implications and service planning. 
Page 107

Page 108

Appendix 1 
A review of the Festive season arrangements was completed and as a result all services are now required to provide
information about service cover available over holiday long weekends which enables a more  collaborative and supportive
approach. 
Mitigating
Actions: 
Information from the updated BIA/BCP informed elements of the Winter Preparedness Plan 
A Friday huddle continues, this allows the status of services across the whole system to provide information and
contact details to the Senior Manager on Call (SMOC) over the weekend. If any potential issues are highlighted the
relevant Persons at Risk Data is compiled and if appropriate, shared with relevant personnel. 
NHSG have introduced system wide daily huddles to manage the flow and allocation of resources which require
attendance from Dr Grays and HSCM. 
Practitioner group established for Moray with representation from HSCM, Dr Grays, Moray Council and NHSG to
discuss matters arising from the Local Resilience Forum and within our respective organisations.  In addition it will
provide a forum for discussion of the linkages between organisational response plans to ensure there are no gaps or
over reliance on particular local resources. 
HSCM continues to monitor the local situation regarding impacts on staffing and is engaged with NHSG emergency
planning arrangements and Council Response and Recovery management team to be ready to escalate response if
required. Work was undertaken within NHSG, Aberdeenshire HSCP and Aberdeen City HSCP to look at Surge flows
and establish a mechanism that will provide easy identification of “hot spots” across the whole system in Grampian, to
facilitate a collaborative approach to addressing the issues through the use of a common Operational Pressure
Escalation approach.  This work could underpin surge responses in winter and at other times of pressure and having a
standard approach across Grampian could aid communication and understanding. 
Assurances: Audit, Performance and Risk Committee and NHS Grampian Civil Contingencies Group oversight and scrutiny.
HSCM Civil Contingencies group review specific risks and action plans to mitigate, developing plans and testing
arrangements in partnership with NHSG and Council
Gaps in
assurance:
Moray Integrated Joint Board (MIJB) was designated as a Category 1 responder under the Civil Contingencies Act 2004
from March 18th 2021. That designation imposed a number of statutory duties in terms of the Act and the associated
Scottish Regulations1.  MIJB has no dedicated, specialist in post and is reliant on the Corporate Manager covering this
increasingly demanding role in addition to other duties without the necessary background, knowledge, skills and 
1 Civil Contingencies Act 2004 (Contingency Planning) (Scotland) Regulations 2005
Page 108

Page 109

Appendix 1 
experience. This presents a potential organisational risk in terms of compliance, and our ability to provide assurance on
discharging our civil contingency arrangements. This has been highlighted to the Chief Officer and IJB. 
The debriefs from the storms in 2021/22 have identified lessons learnt for Grampian Local Resilience Partnership and
more locally for the response co-ordination within Moray.    Action plans are being developed in collaboration with Moray
Council’s emergency planning officer to address the issues identified.  The main issues related to developing wider
awareness of roles and responsibilities,   and improving general awareness of response structures and meeting protocols. 
This will be incorporated into training schedules going forward.  It has also highlighted the need for a robust arrangement
for out of hours contact and clarity of roles and responsibilities across the system which is being discussed at SMT.
Option Appraisal discussions have commenced. 
Progress has been made however further work is required to address the targets in the implementation plan that have
not been met and the Resilience standards as identified by the NHSG Civil Contingencies Group. 
The ‘Care for People’ strategic document has been presented to HSCM SMT and CMT for comment it will then be
presented to MIJB. It is anticipated this will be completed by end August 2023. A draft operational response plan has
been drawn up and will also be presented for approval shortly after. An information session including the ‘Care for People’
element was delivered on 2 May 2023, to senior managers who carry out the role of SMoC, this included input from Moray
Council Emergency Planning Officer and NHS Grampian. 
The intention is to hold a table top exercise with managers from HSCM and Moray Council to test the invocation
arrangements to ensure common understanding of roles and responsibilities.
Table top style exercises are currently being arranged with some of those services who have submitted their finalised
Business Continuity plans for February 2023. 
Development of a HSCM Persons at Risk Database continues and all partners are now involved, looking to improve the
quality of the data held.
Current
performance:
The Senior Management Team participated in Strategic Leadership in a Crisis training in 2020 and a programme of
further training for the wider management team is scheduled. A follow up session was held in September 2022. A
further session took place in Moray in May 2023. 
Many services have business continuity arrangements and some are overdue for an update.  Work has progressed in
identification of a critical functions list for agreement by System Leadership Group that will inform planning
arrangements going forward.  There will need to be changes made to business continuity plans following the
implementation of additional ICT resources in services which have provided a greater deal of resilience for some
services and functions – albeit reliant on electricity supply.  A schedule of review and exercising of business impact
Page 109

Page 110

Appendix 1 
assessments and plans has been scheduled for this year across services. All services have been requested to prioritise
their Business Continuity planning with a particular lens on power outages. 
Annual report on progress against NHS resilience standards was presented to the APR committee on 30 March 2023. 
Report on the implications of the designation as a Category 1 responder was presented to MIJB 25 November 2021. 
Work is currently underway to plan for possible National Power Outages across the UK. This is being co-ordinated
across Grampian to ensure all Partners are involved. Information/planning sessions were also delivered via HSCM to 
our Primary Care partners. They were invited to share any emergency plans with the partnership. 
Comments: The requirements of a Category 1 Responder continue to increase in demand placing increased pressures across
already overstretched services and managers. MIJB does not have a subject matter expert leading on these topics.  
Page 110

Page 111

Appendix 1 
6
Description of
Risk: 
Regulatory
Risk to MIJB decisions resulting in litigation/judicial review.  Expectations from external inspections are not met.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high MEDIUM
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Considered medium risk due to the impact of Covid-19 and resultant efforts required to remobilise services and/or the
increase in workloads stretching a workforce that has been under sustained pressure for a considerable time. 
The ongoing impact of the Covid 19 pandemic is stretching resources to deliver care in the community across all
providers (internal and external) so there is a potential increased risk of expected standards not being achieved despite
the best efforts of all concerned.     
Rationale for Risk
Appetite: 
The Board, staff and providers across Moray are all committed to ensuring high standards of clinical care & governance
through operational policies.  Innovation and new ways of working may mean traditional regulations do not exist and
require to be developed, no longer apply, or are contradictory. 
We will only take regulatory risks knowingly, following consultation with the relevant regulatory body and where we have
clear risk mitigation in place. 
Controls: Clinical and Care Governance (CCG) Committee established and future reporting requirements identified
Clinical Risk Management and Practice Governance group has oversight of their respective professional standards and
feed into Clinical and Care Governance Group, which then escalates to CCG Committee as necessary.
High and Very High operational risks are reviewed by System Leadership Group monthly and a review of all risks will be
undertaken as part of the risk management framework.
Workshops took place in January and February 2023, ‘A conversation about Clinical Governance’. Additional operational
workshops will continue in 2023. 
Complaints and compliments procedures in place and monitored.   
Clinical incidents and risks are being reviewed on a fortnightly basis to ensure processes are followed appropriately and
consistently and responses are recorded in a timely manner.
Adverse events and duty of candour procedures in place and being actioned where appropriate and summary reports
submitted to CCG committee.
Page 111

Page 112

Appendix 1 
Reports from external inspections reported to appropriate operational groups and by exception to SMT for subsequent
reporting to CCG or Audit Performance and Risk Committee as appropriate, albeit there was a reduction in some areas
of external inspection reporting during the Covid period due to social distancing restrictions. It is anticipated that these
will begin to increase over the coming year. 
Care Home Oversight Group meets to oversee and manage risks in care homes.
Children and Adult Protection services are being delivered and reported to their respective committee on a regular basis.
Mitigating
Actions: 
This risk is discussed regularly by the three North East Chief Officers. 
Additional resource has been allocated to support the analysis of information for presentation to CCG committee
All High and Very High risks are now brought before the senior management team in Moray. 
Process for sign off and monitoring actions arising from Internal and External audits has been agreed
Assurances: Audit, Performance and Risk and Clinical and Care Governance Sub-Committees oversight and scrutiny.
Governance Framework in place and operational. 
Gaps in
assurance:
Process for highlighting recurring themes or strategic expectations from external inspections requires further development
to ensure Committee has sight of significant issues. 
Current
performance:
External inspection reports are reviewed and actions arising are allocated to officers for taking forward. 
Two Days of Audit took place across Moray on 25th and 26th January, 2023 respectively. These were led by the Clinical
Service Leads.  The findings of these events were compiled and outcomes are assessed by the relevant service leads
and SMT. A further round of audits on Social Care will now be completed and a full report will be considered if
necessary, dependant on outcomes. 
A summary of inspections is included in the Annual Performance report.   
The level is marked as an increasing risk on the basis that services are under pressure with the issues with staffing
capacity and the need to focus on delivery of critical functions which may mean external inspection are not the priority
at this moment in time. 
The Adult Support Protection inspection took place in April/May and an action plan has been developed and is now in
place. 
Comments: No major concerns have been identified for HSCM services in any audits or inspections during 2021/22. 
Page 112

Page 113

Appendix 1 
7
Description of
Risk: 
Operational
Continuity and
Performance:
Inability to achieve progress in relation to national Health and Wellbeing Outcomes.   
Performance of services falls below acceptable level.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Potential impacts to the wide range of services in NHS Grampian and Moray Council commissioned by the MIJB arising
from reductions in available staff resources as budgetary constraints impact. 
Unplanned admissions and delayed discharges place additional cost and capacity burdens on the service.   
The level of delayed discharges has remained high, reflecting the sustained pressure in the system following the Covid
-19 pandemic impact and the lack of availability of care in the community.  There are sustained focussed and collective
efforts by all those working in the pathway.  However this is a complex area and will require continued effort to realise
reductions and maintain them.   
Rationale for Risk
Appetite: 
The Board is cautious but open about risks that could affect outcomes that are priorities for people in Moray. There is a
slightly higher appetite to risks that may mean nationally set outcomes – that by design are not given a high priority in
Moray - are not met. There is new focus on addressing positive risk taking to ensure the most appropriate and timely
measure of care for the population of Moray, this is being supported through various work streams across the system. 
This will only be accepted where there is a clear rationale, and preferably also a way of demonstrating what the IJB is
doing to meet the aspiration the outcome was created for. 
Controls: Performance Management reporting framework. 
2022 to 2032 “Partners in Care” Strategic Plan was approved and development of delivery plan is underway.
Performance is regularly reported to MIJB. Revised Scorecard being developed to align to the new strategic priorities.
Best practice elements from each body brought together to mitigate risks to MIJB’s objectives and outcomes.
Chief Officer and SMT managing workload pressures as part of budget process.
A daily Huddle and write up circulates the picture on performance across community and acute services for the
Portfolio and  service managers have a shared understanding of the pressures in the system and mitigations taking
Page 113

Page 114

Appendix 1 
place.  Work continues on  refinement of G-OPES (Grampian Operating Pressures and Escalation System) led by
NHSG but being developed locally to identify the triggers and resultant actions required in services to respond to
pressure points.
Mitigating
Actions: 
Service managers monitor performance regularly with their teams and escalate any issues to the System Leadership
Group (SLG) for further discussion to provide wider support, developing shared ownership and a greater understanding
across the whole system.   
Key operational performance data is collated and circulated daily to all managers.  A  Daily dashboard is held on
illuminate for managers to access to ensure any potential issues are identified quickly so action can be taken.  This
dashboard is being reviewed and will be further developed with the intention of further dashboards to provide a whole
system overview.  This has been discussed at SLG and agreed. 
Performance information is presented to the Performance sub group of Practice Governance Group to inform Social
Care managers of the trends in service demands so that resources can be allocated appropriately. 
Assurances: Audit, Performance and Risk Committee oversight. 
Operationally managed by service managers, summary reports to Practice Governance and clinical and care
governance group and to System Leadership Group.  Strategic direction provided by Senior Management Team. 
HSCM Response Group continues to meet and reviews the key performance information and actions that are required
to deliver the priority services.
Gaps in
assurance:
Development work in performance to establish clear links to describe the changes proposed by actions identified in the
Strategic Plan has recommenced but is at an early stage.  This will be progressed as the revised outcomes are
determined and associated KPI are identified.  Progress will be reported to future Board meetings.
Review of systems and processes will commence across HSCM to ensure they are fit for purpose and ensure that
there are no indirect consequences of structure changes resulting in any gaps in assurance processes. 
Current
performance:
Services continue to recover from the pandemic and discover a new ‘battle rhythm’, taking into account all new learning
and experience from the pandemic..
There are likely to be changes to ways of working and this may also have impact on the performance information
required. The Unmet need report continues to show improvement in a number of Performance Indicators, with a
number of them now showing continued improvement over the longer-term. 
Comments: Locality profile information has been provided to Locality Steering Group/Locality Manager to inform potential priorities
for consideration in Localities and work will be taken forward regarding development of performance monitoring and
reporting of key performance indicators in relation to Localities once it has been determined what the intended
outcomes are.  Locality plans are now scheduled to report to MIJB on a quarterly basis.
Page 114

Page 115

Appendix 1 
The delayed discharge group has produced an action plan for implementation and progress is being made.  
Practice Governance have reviewed their operational performance requirements and have a comprehensive data set
used to inform operational priorities.
The Home First priorities are being taken forward and updates are reported to this committee or MIJB on a regular
basis. This work is being undertaken across the Moray Portfolio to improve wider system flow.
Progress in this area has been hampered due to the increased demand for urgent or critical services requiring staff
resource to be prioritised to frontline service delivery. 
The Council has procured new modules for their performance reporting system Pentana and HSCM performance team
have been developing its use for reporting.
HSCM are working in partnership with the Rural Centre of Excellence on transformation projects, the foundation of
planning is addressing how we can improve the delivery of health and wellbeing outcomes and also the strategic aims
of ‘Partners in Care’. 
Page 115

Page 116

Appendix 1 
8
Description of
Risk: 
Transformation
Inability to progress with delivery of Strategic Objectives and Transformation projects. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
There are many issues that will impact on the ability to progress to deliver Strategic Objectives. 
The Strategic Planning & Commissioning group has been refreshed and re-launched and key work is being progressed. 
There was an initial meeting held on 22 September 2021 to consider terms of reference and the proposed structure for
oversight, prioritisation and assurance in relation to key developments, their fit with IJB strategy and enabling elements. 
The interim appointment of the Strategic and Planning Lead provides capacity to take this forward and to align the
priorities arising nationally, Grampian-wide and locally. 
The remobilisation plan for HSCM services that were suspended or reduced is progressing with Providers services and
social work implementing the IJB decision to return to delivery of both substantial and critical eligibility criteria.  Work has
progressed risk assessments are completed and assessments have been or are in the process of being reviewed to
ensure equality.   
The impact of Covid 19 on the population of Moray is still not fully realised.  It is therefore not possible to predict the
extent of the impact on the ability to progress with delivery of Strategic Objectives.  There are some aspects that have
progressed very well such as introduction of Near Me consultations but there are others that are more difficult to progress. 
There is concern that due to the workloads and challenges over the last year that teams are weary and/or do not have
capacity at this moment in time, to progress with delivery of development plans at this moment in time.  In addition the
pandemic is still present in the community so services are still responding to the impacts it has for the population of
Moray.  Managers are working with teams to establish “readiness” and their capacity and sense of wellbeing and the
collated output will inform plans going forward. 
One key aspect to facilitate transformation is the need for progress in relation to ICT infrastructure, data sharing and data
security across the whole system.   Work was undertaken by NHS Grampian and partners to address the needs for ICT
kit and information during the response to Covid. 
Page 116

Page 117

Appendix 1 
Rationale for Risk
Appetite:
The Board has a high appetite for risks associated with delivery of transformational redesign. The following should be
considered when accepting these risks:
• We understand and can mitigate other risk types that may arise, e.g. safety or financial within appetite 
• Service users are consulted and informed of changes in an open & transparent way 
• We will monitor the outcome and change course if necessary   
Controls: It is recognised that there will be significant changes taking place in Social Work practice with the implementation of the
Self Directed Support standards and the move to outcomes based services, so governance arrangements are being set
up to facilitate the same type of oversight and communication that is in place for the Home First programme. 
Mitigating
Actions: 
Integrated Infrastructure Group previously established, with ICT representation from NHSG and Moray Council, to
consider and provide solutions to data sharing issues and ICT infrastructure matters which is an area that will be taken
forward alongside the Moray Growth Deal projects.  The Moray Transformation Board has recently restarted and will
link to all relevant groups. 
Assurances: Strict ICT and data sharing policies and protocols in place with NHS Grampian and Moray Council.
A Moray Portfolio Infrastructure Programme Board has been established to support the operational delivery of the aims
and objectives set e.g. Analogue to Digital changeover, Buildings and Assets oversight and Smarter Working will
support this agenda. 
Gaps in
assurance:
Transformation/implementation planning is in development and will inform outcomes and performance reporting on the
delivery of the strategic plan.
Protocol for access to systems by employees of partner bodies are in place.
Information Management arrangements to be developed and endorsed by MIJB.
Process of identification of issue and submission to data sharing group requires to be reinforced to ensure matters are
progressed.
The strict information sharing protocols can cause issues when trying to work across system in an open and
transparent way.
Smarter Working programmes are being progressed in partnership with Council and NHSG.
Current
performance:
Training programme to be developed on records management, data protection and related issues for staff working
across and between partners.   
Comments: Where national systems are involved it may not be possible to identify a solution however the issues will be able to be
raised at the appropriate level via the Grampian Data Sharing Group where all three partnerships are represented. 
Page 117

Page 118

Appendix 1 
9
Description of
Risk: 
Infrastructure
Requirements for support services are not prioritised by NHS Grampian and Moray Council.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Changes to processes and necessary stakeholder buy-in still bedding in. 
Moray Council is undertaking a Property review of office and depot accommodation and the potential impact for HSCM
services requires consideration.  The output was anticipated in October 2019 however due to changes with roles and
responsibilities within the Council however the paper has been out for consultation. NHSG have advised that staff should
continue to work from home at present whilst policies and protocols are developed.  Moray Council have a dedicated MC
officer leading on a hybrid working plan with input from HSCM on their requirements. It is anticipated that this will conclude
December 2023. 
ICT infrastructure service plans in NHS Grampian and Moray Council are not yet visible to HSCM and development of
communication and engagement process is required. 
The impact of Covid has resulted in a change in ICT strategy for Moray Council.  Council employed staff requiring mobile
technology have now been provided with it and some staff are still working from home.
Rationale for Risk
Appetite: 
Low tolerance in relation to not meeting requirements.
Controls: Chief Officer has regular meetings with partners
Computer Use Policies and HR policies in place for NHS and Moray Council and staff. 
PSN accreditation secured by Moray Council 
Infrastructure Programme Board was established with Chief Officer as Senior Responsible Officer/Chief Officer
member of CMT. Process for submission of projects to the infrastructure board approved and implemented to ensure
appropriate oversight of all projects underway in HSCM.  The Board has only recently restarted, so in the interim,
project requests are being processed via Senior Management Team. The interim Strategy and Planning Lead will
support the Infrastructure Programme Board for Moray portfolio. 
Page 118

Page 119

Appendix 1 
Mitigating
Actions: 
Membership of the Board was reviewed and revised to ensure representation of all existing infrastructure processes and
funding opportunities.
Process for ensuring infrastructure change/investment requests developed
Dr Gray’s strategy (vision for the future) is being produced collaboratively with input from NHSG and HSCM
management. 
Assurances: Infrastructure Programme Board functions to provide robust governance and assurance that proposed projects have a
robust business case and meets requirements of the respective partner organisations.  This board reports to Strategic
Planning and Commissioning Group.  Both of these groups have been recently refreshed and remobilised. 
Workforce Forum meeting regularly with representation of HR and unions from both partner organisations 
Gaps in
assurance:
Further work is required on developing the process for approval for projects so that they are progressed timeously.
Need to review all existing processes in relation to infrastructure changes/projects/investments and streamline to avoid
duplication of effort. 
Infrastructure Board is in development and priority issues are being addressed in relation to infrastructure and premises
risk. Due to staff changes this work will now be incorporated into other roles. This will likely mean that this work will
complete with other priorities of already busy roles. 
Legal services have reduced capacity to provide support due to budget cuts and vacancies so any requests may take
longer.
Internal Audit Services have indicated that their capacity to complete all work required by MIJB may be an issue. This is
being discussed with Moray Council. 
Recruitment for vacancies takes considerable time due to various factors and is presenting a strain on services to maintain
normal service whilst covering vacancies.  There have been several posts that have had to go out to advert more than
once extending the time other staff are covering gaps. 
Current
performance:
No update.
Comments: Existing projects will be reviewed as part of the development of the transformation plans for the Strategic Plan to
ensure resources are being dedicated appropriately and aligned to the emerging Strategic priorities.  Our requirements
for support will be communicated via appropriate channels 
Page 119

Page 120

Page 120

Page 121

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 29 JUNE 2023 
SUBJECT: INTERNAL AUDIT ANNUAL REPORT – 2022/23 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 This report provides the Audit, Performance and Risk Committee with details
of internal audit work undertaken relative to the Moray Integration Joint Board
(MIJB) for the financial year ended 31 March 2023, and the assurances
available on which to base the internal audit opinion on the adequacy of the
MIJB’s systems of internal control. 
2. RECOMMENDATION 
2.1  The Audit, Performance and Risk Committee is asked to consider and
note the contents of the annual report given as Appendix 1 to this
report. 
3.  BACKGROUND 
3.1 The purpose of this report is to present the Audit, Performance and Risk
Committee with the Internal Audit Annual Report for the year to 31 March
2023 which includes the Chief Internal Auditor’s independent assurance
opinion on the adequacy of the MIJB’s systems of internal control. 
4.  KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1  The Public Sector Internal Audit Standards (PSIAS) require that the Chief
Audit Executive (CAE), the MIJB’s Chief Internal Auditor,  provide an annual
internal audit opinion and report on the adequacy and effectiveness of the
MIJB’s systems of governance, risk management and internal controls to
support the preparation of the Annual Governance Statement. This is in
support of the overall governance arrangements of the MIJB. 
4.2    The report covers the year to 31st March 2023 and is provided as Appendix 1. 
Item 9.
Page 121

Page 122

5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Partners in
Care 2022 – 2032”
Internal audit work supports good governance and assists in securing
appropriate systems of internal control. 
(b)  Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications and Mitigation
No implications directly arising from this report. 
(e) Staffing Implications
No implications directly arising from this report. 
(f)   Property
No implications directly arising from this report. 
(g)  Equalities/ Socio Economic Impacts 
No implications directly arising from this report. 
(h) Climate Change and Biodiversity Impacts
No implications directly arising from this report. 
(i) Directions 
No implications directly arising from this report. 
(j) Consultations
There have been no direct consultations during the preparation of this
report. 
6. CONCLUSION 
6.1 This report provides a summary overview of the nature and extent of
audit work carried out during the year, and informs the annual internal
audit opinion on the internal control environment operating within the
MIJB. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor 
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/29062023 
Page 122

Page 123

APPENDIX 1 
INTERNAL AUDIT
ANNUAL REPORT and OPINION 
1 APRIL 2022 to 31 MARCH 2023
Item 9.
Page 123

Page 124

CONTENTS 
PAGE
SECTION-1 INTRODUCTION 3
SECTION 2 BASIS OF OPINION 4
SECTION 3 SUMMARY AND LIMITATIONS OF WORK THAT
SUPPORTS OPINIO
4 - 6
SECTION 4 OPINION 6 - 7 
Page 124

Page 125

SECTION 1 – INTRODUCTION 
Purpose of this report
Public Sector Internal Audit Standards (PSIAS) requires that the Chief Internal Auditor
provide a written statement to inform the Annual Governance Statement. This report
constitutes the required statement. In compliance with PSIAS, this report presents the
opinion on the overall adequacy and effectiveness of the Moray Integration Joint
Board (MIJB) risk management, control and governance processes based on the work
Internal Audit has performed. In addition, my evaluation will also include an
assessment of reports issued by other review agencies. The scope of Internal Audit
work, the responsibilities of Internal Audit and the assurance given on the adequacy
and effectiveness of the Internal Control System of the MIJB are explained further in
Section 4 of this report. 
Responsibilities of Management and Internal Audit 
It is management’s responsibility to maintain systems of risk management, internal
control and governance. Internal Audit is an element of the internal control framework
established by management to examine, evaluate and report on accounting and other
controls over operations. Internal Audit assists management in effectively discharging
its responsibilities and functions by examining and evaluating controls. Internal Audit
cannot be held responsible for internal control failures.
Internal Audit’s role includes assessing the adequacy of the risk management, internal
controls and governance arrangements put in place by management and performing
testing on a sample of transactions to ensure those controls were operating for the
period under review. The responsibility for providing the Internal Audit Service to the
MIJB is by the Moray Council’s Internal Audi Section. However, reliance is also
obtained from the Internal Audit Service Provider for NHS Grampian to support the
annual internal opinion on the MIJB’s internal control environment. 
Public Sector Internal Audit Standards (PSIAS) require officers of the Internal Audit
Section to communicate on a timely basis all facts and matters that may have a
bearing on their independence. I can confirm that all staff members involved in the
2022/23 internal audit reviews were independent of operational processes and their
objectivity was not compromised in any way. 
Page 125

Page 126

SECTION 2 –BASIS OF OPINION 
My evaluation on the adequacy and effectiveness of the MIJB framework of
governance, risk management and internal control is based on the following: 
• The audit work undertaken by Internal Audit during the year to 31 March
2023.   
• The governance statement signed by the Chief Officer of the MIJB for the
year ended 31 March 2023. 
• Reports issued by the MIJB’s External Auditor, and other external review
agencies. 
• My knowledge of the MIJB’s governance, risk management and
performance monitoring arrangements. 
Assurance is also based on the wider audit work conducted by the Chief Internal
Auditor in his capacity as the Audit and Risk Manager of the Moray Council and from
an annual internal audit report prepared for the Grampian Health Board providing an
opinion on the adequacy and effectiveness of its system of internal control. 
SECTION 3- SUMMARY AND LIMITATIONS OF WORK THAT SUPPORTS THE
OPINION 
Progress on the 2022/23 internal Audit Plan 
Internal Audit operates independently within the organisation. While there have been
challenges due to changes in working practices with officers working from home,
management has imposed no limitations on the scope of audit work. The Annual Audit
Plan presented to the Audit, Performance and Risk Committee describes in some
detail the framework around which audit work is developed. In addition, the selection
of audit topics was selected having regard to corporate planning documents, budget
data and information drawn from the corporate risk register, and takes into account
input from senior management regarding possible areas for audit.  
The internal audit work has been conducted in accordance with an established
methodology that promotes quality and conformance with the Public Sector Internal
Audit Standards and the agreed Internal Audit Annual Audit Plan.
A summary of the audit projects completed from the MIJB Audit Plan is summarised
as follows:
• An audit was undertaken to review that an appropriate system exists in the
management, security and transfer of data between the Council and care
providers, including NHS Grampian. This audit was highlighted for review
from discussions held with the internal audit providers of NHS Grampian,
Aberdeen City and Aberdeenshire Councils, where it was agreed to try and
develop a more coordinated audit approach with the intention of providing a
more comprehensive opinion on the control environment of systems within
Health and Social Care. 
• The audit noted several areas where further improvements are required to
current operating systems and procedures. The data-sharing arrangements
for patient/ service user information between the Council and NHS Grampian
Page 126

Page 127

were found to be based on a Memorandum of Understanding from 2011. It
was agreed that a Data Sharing Agreement would be developed between the
Council and NHS Grampian to reflect the updated Data Protection
Legislation. A Data Protection Impact Assessment (DPIA) is an essential
requirement of the UK General Data Protection Regulation (GDPR).
However, at the time of the audit, only one DPIA had been completed
regarding the data sharing arrangements with care providers. 
• An audit review tested a sample of creditor payments generated under the
direction of the Moray Integration Joint Board. Testing used a data analysis
software application to extract a random sample of transactions for review.
The purpose of the audit was to confirm that effective controls are operating
to ensure all payments are appropriately authorised, accurate and paid in
accordance with regulations and agreed terms and conditions. A check was
also made for duplicate payments by extracting listings where more than one
invoice from a single supplier has been paid for the same amount. Findings
noted payments had been made to Care Providers before the services were
delivered and a need for further improvements in the recording and
processing of invoices. 
• A review was undertaken into how information relating to social care service
users is recorded, accessed and kept up to date. The Council uses a system
known as CareFirst to record and manage social care cases for both adult
and children’s services. CareFirst is a long standing widely used application
within the public sector for recording social care data. The scope of the audit
was to undertake a review of how information is recorded and managed for
Adult, Children and Families Services. The audit also reviewed access
controls around the management of case files. This included consideration
of who can view, add, amend or delete information. 
• The review found that information concerning a service user care package is
recorded on multiple databases, i.e., CareFirst, shared drive and paper files.
It is pleasing to report that Health & Social Care Moray is developing a
Strategic Plan- Partners In Care that includes the replacement of the
CareFirst System. In addition, the audit found a need to strengthen access
controls within CareFirst and for managers to restart reviews of service user
case files to ensure officers comply with operating guidelines. However, it is
appreciated over the last few years duties have been diverted to support
pandemic related activities. 
• An audit of the financial monitoring arrangements for Self-Directed Support
(SDS) packages was undertaken as part of the coverage of Health & Social
Care Moray activities. The scope of the audit was to review systems and
procedures in the delivery and management of care provided under Options
2 and 3 of the SDS Scheme. This included examination of the processes to
support individuals in their preferred care delivery option, contractual
relationships with care providers, financial management and monitoring of
individual care packages. Annual expenditure for individuals in receipt of SDS
Option 2 and & 3 care packages amounted to approximately £40 million and
£17 million respectively for external and internal care providers.     
• The review found a number of findings where further improvements are
required in systems and procedures. It was noted that where care is delivered
through SDS Option 2, a tripartite agreement should be agreed to detail the
care provided, signed by the provider, Council, and the supported person.
However, from the testing undertaken, it was found that most service users
had no tripartite agreement to formalise their care arrangements. The audit
also noted a large percentage of service users support plans tested had not
been reviewed for over a year. The requirement for an annual review is
detailed within the Social Care (Self-directed Support) (Scotland) Act 2013.
Page 127

Page 128

In addition, difficulty was also experienced in verifying current and changes
in service user support plans to supporting documentation. The demands on
the service are appreciated, but the findings noted from this review are of
concern.   
• Internal Audit reports are regularly presented to members detailing not only
findings but also the responses by management to the recommendations with
agreed dates of implementation. During the year, it was decided that Internal
Audit would also report to the Audit, Performance and Risk Committee follow
up reviews to evidence the effective implementation of these
recommendations. Follow up reviews were completed of the audits
previously undertaken of Self Directed Support direct payments made to
service users and how Health and Social Care Officers manage income held
for individuals under Corporate Appointeeship Arrangements. Unfortunately,
it was found that a number of the recommendations are still to be
implemented, requiring revised dates of implementation to be agreed. The
Service has detailed that staff shortages have resulted in delays in
implementing some of these recommendations.   
Governance - from a review of the annual governance statement prepared for
inclusion with the MIJB accounts; it was noted that the statement had been prepared
in line with good practice guidance issued by CIPFA / SOLACE. The statement
included an assessment of the effectiveness of governance arrangements within the
MIJB regarding the seven principles of good governance identified within the guidance.
It also referenced the governance processes of the principal partner bodies (NHS
Grampian and Moray Council) as sources of additional assurance.   
A review of the Moray Council’s Chief Social Work Officer's annual report noted several
governance arrangements to ensure effective service delivery. The quality of social
work services is assured by Practice Governance meetings. Any issues are reported
to the Clinical & Care Governance Committee of the MIJB for adults. Consultant Social
Work Practitioner posts are well established in adult and children services. Consultants
work with line managers to support social work in complex cases, model best practices
and set practice standards in their respective area. 
It was noted that the Head of Service / Chief Social Work Officer reported an audit
review of Adult Social Care Commissioning Service undertaken by KPMG
Governance, Risk & Compliance Services to the Audit, Performance and Risk
Committee (item 11) of the Moray Integration Joint Board (MIJB) on 30 March 2023.
This audit was requested by the Audit, Performance and Risk Committee of the MIJB
on 31 March 2022. The need for the review was highlighted due to concerns raised by
senior management of Health & Social Care Moray regarding administrative
arrangements within the Commissioning Service, and the findings from a peer review
report in January 2022. 
The audit report by KPMG has detailed 11 key findings relating to governance, roles
and responsibilities, strategy/processes and contract management. It is pleasing to
note that all recommendations have been accepted. However, the Head of Service/ 
Chief Social Work Officer detailed within the report to the Audit, Performance and Risk
Committee of the MIJB on 30 March 2023 (Item 11) the risks to achieving the set
timescales for implementation of the recommendations due to staffing implications and
related restructuring that has taken place following the external review. The Head of
Service/ Chief Social Work Officer confirmed that a review would be undertaken
regarding capacity issues and how that risk can be mitigated using interim support. In
addition, the Head of Service / Chief Social Work Officer has also made a commitment
that progress on implementation of the actions will be reported back to the Audit,
Performance and Risk Committee of the MIJB on a quarterly basis. 
Page 128

Page 129

As the Chief Internal Auditor of the MIJB, I note the findings detailed within the audit
report. I will be closely monitoring progress and undertaking a follow up review once
the implementation dates for the recommendations have passed. 
Risk Management - procedures are well developed with a risk management policy
and strategy in place, a risk appetite statement has been prepared, and a risk register
has been reviewed and updated regularly. The recently updated Risk Register
summarises the principal risks facing the organisation under nine themes; these
themes focus on critical risk areas including finance, environment and operational
continuity, together with transformation risks associated with change and infrastructure
risks given the reliance of the IJB on support from both the Council and the NHS.
Statement on Conformance with the Public Sector Internal Audit Standards 
The Local Authority Accounts (Scotland) Regulations 2014 require public bodies to
operate a professional and objective internal auditing service in accordance with
recognised standards and practices in relation to internal auditing, the Public Sector
Internal Audit Standards.
The Scottish Local Authorities Chief Internal Auditors’ Group, comprising the audit
managers or equivalent of all Scottish Councils, has developed a checklist for
assessing compliance with the Standards. This supports the requirement for self-
assessments and external assessments as part of Internal Audit’s Quality Assurance
and Improvement Programme. Internal performance monitoring against PSIAS has
been ongoing over the last few years. However, a more structured internal review has
recently been completed in preparation for the next External Quality Assessment. 
SECTION 4 – OPINION 
Any system of control can only ever provide reasonable and not absolute assurances
that control weaknesses or irregularities do not exist or that there is no risk of error,
fraud, or breaches of laws or regulations. Furthermore, it is the responsibility of
management to establish an appropriate and sound system of internal control and
monitor the effectiveness of that system. The Chief Internal Auditor is responsible for
providing an annual assessment of the robustness of the internal control system. 
(Assurance was obtained in the interim form at the time of drafting this report from
the Internal Audit Provider of Grampian NHS). 
After consideration of the findings from work carried out by Internal Audit, taken
together with other sources of assurance, with specific reference to the external
assessment undertaken by a private firm into how the Commissioning Service
manages adult social care contracts; it is my opinion that I can only provide limited
assurance that the Moray Integration Joint Board has adequate systems of
governance and internal control 
Dafydd Lewis
Chief Internal Auditor
13 May 2023
Page 129

Page 130

Page 130

Page 131

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 29 JUNE 2023 
SUBJECT: RESILIENCE IN CARE AT HOME (MAY 2023) 
BY:  PROVIDER SERVICES MANAGER 
1. REASON FOR REPORT 
1.1. To update the Audit, Performance and Risk Committee on work being done in
Care at Home to address the Unmet Need in Moray. 
2. RECOMMENDATION 
2.1. It is recommended that the Committee consider and note: 
i) the actions being taken in Care at Home to address the unmet need
in Moray; and 
ii) the increasing demand on the Care at Home Service. 
3. BACKGROUND 
3.1. The purpose of this report is to ensure the Moray Integration Joint Board (MIJB)
fulfils its ongoing responsibility to ensure effective monitoring and reporting on
the delivery of services and on the programme of work as set out in its Strategic
Plan. 
3.2. Weekly monitoring of the unmet need in Care at Home has been in place since
August 2021. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
Assessments
4.1. Since January 2023 the number of individuals awaiting a social care
assessment has been decreasing steadily from 188.  In the week commencing
17 May 2023 this decreased to 58.  This is a 69% decrease since January
2023. 
Item 10.
Page 131

Page 132

Figure 1 
Care at Home Hours
4.2. Since January 2023 the number of weekly hours of Care at Home provided by
Moray Council has increased from 3342 hours to 4046 hours.  This is an
increase of 21%. 
Figure 2 
Care at Home People
Since January 2023 the number of people receiving a Care at Home package
provided by Moray Council has increased from 281 to 313.  This is an increase
of 11.4%. 
Figure 3 
Waiting for Care
4.3. The increasing number of assessments being completed has led to an increase
in the number of people who have been waiting a package of care as shown in
the table below.  This has shown that those waiting in the Community are
Page 132

Page 133

increasing rapidly, with an increase of 23.4% in the number of people waiting
for a care package between January and May 2023. 
Table 1
Number of people assessed and waiting for a
package of care
W/c
02/01/2023
w/c
22/05/2023
% change
from Jan-23
to May-23
In the Hospital 14 14 -
In the Community 128 158 +23.4% 
Figure 4 - Number of people assessed and waiting for a package of care 
Care at Home Enablers
4.4. Care at Home Enablers carry out Care at Home assessments to determine if
care is required.  Since January 2023 the number of assessments completed
by the Care at Home Enablers is 239, compared to 77 completed in the same
period in 2022 (Jan-May).  This is an increase of 210% 
Figure 5 – Care at Home assessments completed by month 
4.5. The chart below shows the number of outstanding referrals taken at the weekly
snapshot time each week since January 2023.  The average is 11, but has
been as low as 0 and as high as 25.  Staffing levels will affect the number of
referrals that can be allocated on a weekly basis and also the caseload of each
Enabler at any point in time. 
3
35
6 10
23
41
21
78 82
33 32
25
36
20
52
68 63
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
2022 2023
Total Linear (Total)
Page 133

Page 134

Figure 6 – Number of outstanding referrals to Care at Home Enablers at weekly snapshot 
4.6. Since March 2022 there have been 496 referrals received for a Care at Home
Assessment. 
4.7. The chart below shows the number of referrals for assessment received each
month since April 2022.  The average is 33 per month, this has been as low as
9 and as high as 66 (March 2023).  This is showing an increasing trend and is
expected to remain high following the start of the Test of Change in the Access
and Area Teams. 
Figure 7 – Number of referrals to Care at Home Enablers by month 
Assessment times
4.8. From the 496 referrals, 122 did not require or did not receive an assessment. 
This can be for a number of reasons for example, inappropriate referrals, crisis
has ceased, care has been sourced elsewhere, person has decided to move to
long term care. The remaining 60 assessments are ongoing.  This leaves 382
assessments that have been completed. 
25
9
14
12
8
12
19
1110
22
19
13
7
15
89
2
00
9
7
18
WC
May
30,
2023
WC
May
23,
2023
WC
May
16,
2023
WC
May
9,
2023
WC
May
2,
2023
WC
Apr
25,
2023
WC
Apr
18,
2023
WC
Apr
11,
2023
WC
Apr
4,
2023
WC
Mar
28,
2023
WC
Mar
21,
2023
WC
Mar
14,
2023
WC
Mar
7,
2023
WC
Feb
28,
2023
WC
Feb
21,
2023
WC
Feb
14,
2023
WC
Feb
7,
2023
WC
Jan
31,
2023
WC
Jan
24,
2023
WC
Jan
17,
2023
WC
Jan
10,
2023
WC
Jan
3,
2023
Number of outstanding referrals at snapshot Average
6 9
29 33
43
26
33
22
30
16
33
46
66
49
44
Page 134

Page 135

4.9. The Chart below shows the number of days people have waited for an
assessment to commence following a referral.
Figure 8 – Length of time between referral and Assessment commencing
4.10.The Chart below shows the number of days people have waited for an
assessment to be completed (from point of referral).
Figure 9 – Length of time between referral and Assessment completion
4.11.There are various reasons why assessments are taking longer than expected. 
One reason is that until recently light touch assessments were being carried out
in hospital causing delays when the person was not deemed medically fit for
assessment but referral had already been received by the team.  The person
could also be waiting for other assessments to take place before the Care at
Home assessment to take place. The assessors could also have to wait for
family or other guardians to be available to attend assessment in the persons
home, rather than an over the phone assessment, and this can take some time.
Finally the team may have trouble locating the person if their circumstances
have changed since the referral was passed over.
275
50
2678.35% 14.25% 7.41%
0-14 DAYS 15-31 DAYS OVER 31 DAYS
176
29
109
56.05% 9.24% 34.71%
0-14 DAYS 15-31 DAYS OVER 31 DAYS
Page 135

Page 136

Test of Change
4.12. There is a Test of change in progress in the Area Social Work Teams in
conjunction with the Access Team, allowing the East and West teams to take
on long term pieces of work (e.g. assessments leading to care) which allows
the Access Team to concentrate on the other (short term) pieces or work.  This
has moved the ‘bottleneck’ of the waiting lists for assessment along the process
to those now awaiting care, and more specifically, those waiting for increases to
their care package. 
Brokerage List
4.13. Partial Care packages – The chart below shows the trend for those already in
receipt of care, but not the full amount they have been assessed (or
reassessed for). 
Figure 10 
4.14 The number of hours of care assessed as needed and not provided for those in
receipt of a care package is currently 629 hours, the highest since recording of
these figures commenced.
The number of weekly hours of care people are waiting for range from 15
minutes to 49 hours.
The average number of care hours people are waiting for is 8 hours 30 minutes.
There are 7 people who have been on the brokerage list for over 300 days. 
32 people have been waiting longer than 2 months. 
START, Moray Council and one external partner provide the majority (64.6%) of
these partial package in terms of outstanding hours (388 hours).  The remainder
are provided by other external providers, Direct Payments, or NHS Teams. 
4.15 The average number of people on the list is 107.  The lowest number was
captured on week commencing February 13 2023, this was 90 people.
The highest number was recorded this week at 137.
If added to this list people in the community awaiting care from the START Team
this number increases to 179. 
Page 136

Page 137

Figure 11 – Number of individuals on Brokerage list
4.16 The effect of having an increased amount of assessments completed is that
people may face a wait whilst care is sourced.  The Broker has advised that
they have seen an influx of care requests recently which has been exacerbated
by our external partners having no capacity to take any care on.
4.17 The chart below shows the months the people on the Brokerage list were last
assessed/reassessed.
• 82.11% have been assessed or reassessed since January 2023 (101 people)
• 17.89% have not been assessed in 2023 (22 people)
Figure 12 – Number of people and month they were last assessed
5. SUMMARY OF IMPLICATIONS
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
The aims of the Care at Home service align to those set out in the MIJB
Strategic Plan and the Moray 10 Year Local Outcomes Improvement
Plan.
137
12612111411510911110395989910110699969099107107112113
WC
MAY
24,
2023
WC
MAY
17,
2023
WC
MAY
10,
2023
WC
MAY 3,
2023
WC
APR
26,
2023
WC
APR
19,
2023
WC
APR
12,
2023
WC
APR 5,
2023
WC
MAR
29,
2023
WC
MAR
22,
2023
WC
MAR
15,
2023
WC
MAR
8,
2023
WC
MAR
1,
2023
WC
FEB
22,
2023
WC
FEB
15,
2023
WC
FEB 8,
2023
WC
FEB 1,
2023
WC
JAN
25,
2023
WC
JAN
18,
2023
WC
JAN
11,
2023
WC
JAN 4,
2023
Series2 Linear (Series2)
2 1 1 1 1 1 3 1 1 2 2 6 8
11
30
34
18
JUL-21
AUG-…
SEP-21
OCT-…
NOV-…
DEC-…
JAN-22
FEB-22
MAR…
APR-…
MAY…
JUN-…
JUL-22
AUG-…
SEP-22
OCT-…
NOV-…
DEC-…
JAN-23
FEB-23
MAR…
APR-…
MAY…
Page 137

Page 138

(b) Policy and Legal
None directly associated with this report. 
(c) Financial implications
None directly associated with this report. 
(d) Risk Implications and Mitigation
There are no risk issues arising directly from this report. 
(e) Staffing Implications
None directly associated with this report. 
(f) Property
None directly associated with this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required because there will be no
impact, as a result of the report, on people with protected characteristics. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined for
this policy/activity. It should be noted that extreme weather events, such
as the recent storms, are expected to occur more frequently and with
greater ferocity in future years. In the longer-term there are likely to be
issues with the reduction in availability and increases in costs of fossil
fuels that will pose challenges for the delivery of care services to people
living in rural areas. 
(i) Directions
There are no directions arising from this report. 
(j) Consultations
For Health and Social Care Moray the Chief Officer, Corporate Officer
and Provider Service Manager have been consulted as has Joan Hall,
Team Manager, Care at Home and Democratic Services Manager Moray
Council and their comments are incorporated in the report. 
6. CONCLUSION 
6.1 This report outlines for the Committee the increasing demand for the Care
at Home Service across Moray.  It also provides the Committee with an
overview of the actions being taken in Care at Home to address the unmet
need in the area. 
Author of Report: Aylsa Kennedy, Performance Officer
Background Papers:  Available on request
Ref: 
Page 138

Page 139

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 29 JUNE 2023 
SUBJECT:  DIRECTIONS UPDATE 
BY:  CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1. To inform the Board of the issues Directions of the Moray Integration Joint
Board (MIJB) for the period 1 October to 31 March 2023. 
2. RECOMMENDATION 
2.1. It is recommended that the Audit Performance and Risk Committee
consider and note the Directions issued in the period October to March of
2022/23. 
3. BACKGROUND 
3.1 The Public Bodies (Joint Working) (Scotland)  Act 2014 (the Act) established
the legal framework for integrating health and social care in Scotland. The Act
required Integration Authorities to develop a Strategic Plan for the integrated
functions and budgets delegated by the health board and local authority.   
3.2 In accordance with Sections 26-28 of the Act, MIJB has in place a mechanism
to action its Strategic Plan which takes the form of binding Directions to one or
both of the Partners. Directions are the means by which the MIJB informs NHS
Grampian and Moray Council of what is to be delivered using the integrated
budget in order to achieve the strategic aims outlined in its Strategic Plan. A
Direction must be issued in respect of every function that has been delegated
to the MIJB. Directions are an obligatory legal mechanism. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 At the MIJB meeting on 31 March 2022, the Directions policy and procedures
were approved (para 17 of the minute refers).  This was to enhance
governance, transparency and accountability between the MIJB and its Partner
organisations, NHS Grampian and Moray Council through a clear framework for
the setting and reviewing of Directions and to confirm adequate governance
arrangements. 
Item 11.
Page 139

Page 140

4.2  As part of the approved procedures, The Audit, Performance and Risk
Committee are to review all live Directions on a six monthly basis for assurance
of delivery and compliance through an update report.  With any resulting
concerns being escalated to the MIJB at the first available opportunity. The first
report on the first six months for 2022/23 was noted by this Committee on 24
November 2022 (para 8 of the minute refers)   
4.3 APPENDIX 1 details the Directions approved during the period 1 October to 31
March 2023, for consideration.   
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
This report is consistent with the objectives of the Strategic Plan and
includes Directions detailed to the partners of the MIJB.  
(b) Policy and Legal
The MIJB is, in terms of Section 26 to 28 of the Public Bodies (Joint
Working) (Scotland) Act 2014 required to direct NHS Grampian and
Moray Council to deliver services to support the delivery of the Strategic
Plan is as far as the functions that have been formally delegated. 
(c) Financial implications
None arising directly from this report. 
(d) Risk Implications and Mitigation
The delivery of the Strategic Plan is put at risk should appropriate
Directions not be issued. The quality of the Directions are also a factor in
ensuring implementation as intended. Close monitoring of Directions and
scrutiny by Committee provides reasonable assurance that Directions
are being carried out as intended. 
(e) Staffing Implications
None arising directly from this report. 
(f) Property
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
None arising directly from this report. 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report. 
(i) Directions 
None arising directly from this report. 
(j) Consultations
The Chief Officer and Corporate Manager of the MIJB have been
consulted for comment where appropriate. 
Page 140

Page 141

6. CONCLUSION 
6.1 The Audit, Performance and Risk Committee are asked to consider and
note the report content and Directions included in APPENDIX 1. 
Author of Report: Deborah O’Shea, Interim Chief Financial Officer
Background Papers:  with author
Ref: 
Page 141

Page 142

Page 142

Page 143

MIJB Register of Directions              APPENDIX 1 
Issue to Agreed by IJB
on
Effective from Title of Direction and
Reference
Functions covered by Direction Link to direction 
GHB 24 Nov 2022 01 April 2022 MIJB Updated Budget
Position 2022/23
Ref: 20220401GHB03 
All functions listed in Annex 1, Part 1 of the
Moray Health and Social Care Integration
Scheme and all functions listed in Annex 2,
Part 1 of the Moray Health and Social Care
Integration Scheme. 
SPMAN-
1236605834-1518 
MC 24 Nov 2022 01 April 2022 MIJB Updated Budget
Position 2022/23
Ref: 20220401MC03 
All functions listed in Annex 1, Part 1 of the
Moray Health and Social Care Integration
Scheme and all functions listed in Annex 2,
Part 1 of the Moray Health and Social Care
Integration Scheme. 
SPMAN-
1236605834-1519 
MC 30 Mar 2023 01 April 2022 MIJB Updated Budget
Position 2022/23
Ref: 20230330MC04 
All functions listed in Annex 1, Part 1 of
the Moray Health and Social Care
Integration Scheme and all functions
listed in Annex 2, Part 1 of the Moray
Health and Social Care Integration
Scheme. 
SPMAN-1236605834-
1624 
GHB 30 Mar 2023 01 April 2022 MIJB Updated Budget
Position 2022/23
Ref: 20230330GHB04 
All functions listed in Annex 1, Part 1 of
the Moray Health and Social Care
Integration Scheme and all functions
listed in Annex 2, Part 1 of the Moray
Health and Social Care Integration
Scheme.
SPMAN-1236605834-
1622 
Item 11.
Page 143

Page 144

MIJB Register of Directions              APPENDIX 1 
Issue to Agreed by IJB
on
Effective from Title of Direction and
Reference
Functions covered by Direction Link to direction 
MC 30 Mar 2023 01 April 2023 MIJB Updated Budget
Position
Ref: 20230330MC05 
All functions listed in Annex 1, Part 1 of the
Moray Health and Social Care Integration
Scheme and all functions listed in Annex 2,
Part 1 of the Moray Health and Social Care
Integration Scheme.
SPMAN-1236605834-
1625 
GHB 30 Mar 2023 01 April 2023 MIJB Updated Budget
Position
Ref: 20230330GHB05
All functions listed in Annex 1, Part 1 of the
Moray Health and Social Care Integration
Scheme and all functions listed in Annex 2,
Part 1 of the Moray Health and Social Care
Integration Scheme.
SPMAN-1236605834-
1623 
Page 144

Page 145

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 29 JUNE 2023 
SUBJECT: IMPROVEMENT PLAN FOR ADULT SOCIAL CARE
COMMISSIONING 
BY:  HEAD OF SERVICE / CHIEF SOCIAL WORK OFFICER 
1. REASON FOR REPORT 
1.1. To inform the Committee of progress regarding the improvement plan for Adult
Social Care Commissioning in line with the external review conducted by
KPMG, finalised in February 2023 
2. RECOMMENDATION 
2.1. It is recommended that the Committee: 
i) consider and note the improvement plan attached at Appendix 1;
and 
ii) approve the contents of the plan. 
3. BACKGROUND 
3.1. The KPMG report was submitted to Committee on 30 March 2023 (para 11 of
the minute refers).  It was agreed at the Committee that progress will be
reported quarterly. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1. The Adult Services Commissioning Team have implemented an improvement
plan with clear aims, objectives and target dates.   
4.2. Clear roles and responsibilities in relation to the oversight and management of
social care commissioning activities needs to be addressed through the
governance structures defined within the MIJB.  Contracting work is reported to
the Managers Commissioning Meeting and then escalated if required. A review
of the Practice Governance Board is currently underway.  The Managers
Commissioning Meeting will be aligned with this agreed process. 
Item 12.
Page 145

Page 146

4.3. The partnership working between departments in Commissioning, Procurement
and Finance is achieved through regular meetings to align the recording of
contracts, budgets and auditing.  This is structured with the Procurement
service holding a Contract Register and the reviewed Departmental Contracts
Database is held within the Commissioning team. 
4.4. In the wider context of colleague’s knowledge regarding commissioning within
Health and Social Care Moray, the Commissioning team compiled a training
programme regarding the remit of the commissioning team, the principles of
Ethical Commissioning and the future direction of the commissioning function.
Training events will be scheduled later in 2023.   
4.5. An end to end Commissioning Procedure has been written that incorporates the
commissioning and decommissioning process. A Contract Record Document
has been created which requires sign off by Senior Management within Health
and Social Care Moray. 
4.6. The Commissioning team have prioritised the work plan for 2023 and 2024 to
include reviewing and renewing out of date contracts. A plan requires to be
created to address the rest of the contracts whilst ensuring future expiring
contracts remain relevant and to standard.  This is monitored within the team
via a weekly team meeting. 
4.7. Community Care Finance has systems in place to ensure every invoice is
recorded and approved.  Moray Council Payments Team have a check in place
to confirm all invoices have appropriate approval.  This process meets the
process detailed in the Invoice Processing Standard Operating Procedure.   
4.8. An audit trail process was created and trialled within the commissioning team. 
Commissioning Change of Service forms were produced.  A cover sheet for
contract letters was produced, which requires the signatures of all involved in
the process, ensuring a robust audit trail.   
4.9. The decision making process has a robust audit trail.  The decision making in
relation to an invoice query resolution is stored within the Community Care
Finance team. 
4.10. Commissioning and procurement liaised to align the contract data base and the
procurement data base.  Senior Commissioning Officers will monitor, review
and update the database quarterly.  The service manager will do spot checks.   
4.11. A performance management system is tied in with the audit process. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”                   
In order to fulfil the MIJB strategic aims, it is essential that services are                   
operating with optimum efficiency to ensure the needs of the Moray                   
population can be met, that services are fit for purpose and that
processes and accountability is clear. 
Page 146

Page 147

(b) Policy and Legal        
The CSWO/Head of Service must ensure that services delegated by her        
work within the legal and policy framework related to commissioning and        
delivery of services. 
(c) Financial implications         
There are no financial implications arising from this report. 
(d) Risk Implications and Mitigation                   
There is a risk that timescales and outcomes may not be reached due to                   
the current resource and restructure of the team, although, efforts will be        
made to minimise this risk. 
(e) Staffing Implications         
There are no staffing implications. 
(f) Property        
There are no property implications 
(g) Equalities/Socio Economic Impact
This report does not require an EIA. 
(h) Climate Change and Biodiversity Impacts
None 
(i) Directions
None 
(j) Consultations         
Dafydd Lewis, Senior Auditor          
Lorraine Paisey. Chief Financial Officer                   
Simon Bokor-Ingram, Chief Officer 
6. CONCLUSION 
6.1 The committee is requested to note the progress plan at APPENDIX 1. 
Author of Report: Lizette Van Zyl 
Background Papers:  
Ref: 
Page 147

Page 148

Page 148

Page 149

Moray Integration Joint Board
Commissioning Service 
1
KPMG Recommendations APPENDIX 1 
Risk Ratings for Recommendations
High  Medium  Low 
No.  Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09 MAY 23
Responsible
Officer
Timescale for
Implementation
1. Governance - The Moray Integration Joint Board should prioritise having senior oversight to close the gap between the organisation
and those charged with governance, as there is currently an insufficient grip on governance 
2.1.1
Clear roles and responsibilities
in relation to the management
and oversight of social care
commissioning activities need to
be representative thought
governance.   
High  Yes  Action plan created for
Management
Commissioning meeting
and date set to write the
Terms of Reference.   
Service
Manager 
31 Aug 23 
2.1.2 Attendance and expectance of
attendees at governance
meetings needs to be clarified 
High  Yes  Head of Service has
supported this process
and clarity provided
around meeting
attendance  
Service
manager 
29 Feb 24 
2.1.3   Prioritise the production of
action plans for each Managers
Commissioning meeting. 
High Yes Monthly meetings are
scheduled and an action
plan template and action
log has been created.  
Service
Manager 
31 May 23
Item 12.
Page 149

Page 150

Moray Integration Joint Board
Commissioning Service 
2
Team Structure & Roles  
Risk Ratings for Recommendations
High  Medium   Low 
No. Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09MAY23
Responsible
Officer
Timescale for
Implementation 
2. Roles & Responsibilities – There is a lack of clarity and roles and responsibilities and poor cross organisational relationships
2.2.1  Every member of staff within the
commissioning team should
have a clear job description 
High Yes Job descriptions are
accurate for the
commissioning team and
staff know where to find
the documents for future
reference.
Service
Manager 
31 May 23 
2.2.2  There is a need for collaboration
across the various Council
teams to produce shared
learning and increased
efficiency. 
High Yes The senior commissioning
officer and payment
manager are meeting to
review the commissioning
and procurement
interaction. 
There has been an initial
meeting with the chief
finance officer to discuss
better audit trails. 
Service
Manager
31 Aug 23
Page 150

Page 151

Moray Integration Joint Board
Commissioning Service 
3
Training 
Senior Commissioning
Officer   has been working
on a presentation of the
remit of the
commissioning team and
future direction of the
commissioning function.   
2.2.3  Performance management of
commissioning required to be
monitored and tasks completed
timelessly 
High Yes The commissioning team
meet every week and
discuss workload this is
monitored with the work
tracker   
Contract and monitoring
plans for the year are in
progress.       
Service
Manager
29 Feb 24 
Risk Ratings for Recommendations
High  Medium   Low 
No. Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09MAY23
Responsible
Officer
Timescale for
Implementation
3.   Training
Page 151

Page 152

Moray Integration Joint Board
Commissioning Service 
4
Process Maps
2.3.1 Implement a clearly defined staff
training plan. 
Guidance documents needs to
be available for staff to refer to.   
Medium Yes All commissioning staff
members are trained in
core and service
specific training. 
A training plan is in the
process of being
created.    
Service
Manager
31 Aug 23
Risk Ratings for Recommendations
High  Medium   Low 
No. Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09MAY23
Responsible
Officer
Timescale for
Implementation
4. Process Maps
2.4.1 A commissioning procedure
needs to be created.  
High Yes A procedure has been
created and is awaiting
staff consultation.   
A Contract Record
Document has been
created which captures all
activity within the
commissioning cycle. 
Service
Manager  
31 Aug 23
Page 152

Page 153

Moray Integration Joint Board
Commissioning Service 
5
Sample Testing
2.4.2 Commissioning staff will attend
a session with management to
discuss the commissioning
procedure. 
A library of process maps is to
be maintained and made
available to staff for future
reference.
High Yes A meeting has taken place
between managers and
staff. 
Work has begun to look at
the process maps 
Service
Manager  
31 Aug 23
2.4.3 Alignment with SDS financial
regulations needs to take plane 
SDS option 2 are
approved and signed off
by the budget manager 
Service
Managers 
31 Aug 23 
Risk Ratings for Recommendations
High  Medium   Low 
Page 153

Page 154

Moray Integration Joint Board
Commissioning Service 
6
No. Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09MAY23
Responsible
Officer
Timescale for
Implementation
5. Sample Testing
2.5.1 All contracts will be signed and
copies of these singed contracts
stored for future reference. 
High Yes All of the new contracts
are signed and stored for
future reference   
Service
Manager
28 Feb 25
2.5.2 Community care finance to
ensure approved expenditure
can easily be tied back to the
underlying invoice. 
High Yes Invoices are matched
against Service
Agreements within the
Carefirst system, ensuring
approved expenditure
matches provider invoice.
This is detailed within the
Invoice Processing
Standard Operating
Procedure (SOP).
Service
Manager 
28 Feb 25
2.5.3 Community care finance will
ensure that Invoices are not
processed without adequate
approval.
Implement Moray IJB Financial
Regulations. 
High Yes Invoices are recorded and
approved by managers.
Moray Council Payments
Team have a further
check in place to ensure
all invoices have
appropriate
approval.  This is detailed
within the Invoice
Processing Standard
Operating Procedure
(SOP).
Service
Manager 
28 Feb 25
Page 154

Page 155

Moray Integration Joint Board
Commissioning Service 
7
. Strategy
2.5.4 Audits of documentation: 
Ensures that processes are
consistently being followed
across the organisation and
fiscal responsibilities are being
met.
High Yes Audit trail process created. 
Commissioning change of
service and authorisation
audit forms were created. 
Comments complaint and
incidents form and
contract monitoring forms
were reviewed. 
Community Care Finance
(CCF) participated in an
internal audit of invoicing
in 2022 and all
recommendations have
been met.  It is anticipated
a further follow up review
will take place during
2023. 
Service
Manager 
28 Feb 25
Risk Ratings for Recommendations
High  Medium   Low 
Page 155

Page 156

Moray Integration Joint Board
Commissioning Service 
8
Invoicing
No. Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09MAY23
Responsible
Officer
Timescale for
Implementation 
6. Strategy
2.6.1 Develop an implementation plan
which supports the wider
strategy. 
Medium Yes The coming months will
see all services contribute
to the Moray HSCP
Strategy by way of a
delivery plan
Head of Service 29 Feb 24
Risk Ratings for Recommendations
High  Medium   Low 
No. Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09MAY23
Responsible
Officer
Timescale for
Implementation 
7. Invoicing
2.7.1 Formalise and document the
approach to variances 
Medium Yes The Community Care
Finance (CCF) team have
developed a Standard
Operating Procedure
(SOP) (February 2023) for
the invoicing process. 
Head of Service 29 Feb 24
Page 156

Page 157

Moray Integration Joint Board
Commissioning Service 
9
Contracts Register
2.7.2 To ensure the decision
making process is more
robust and that the process is
evidenced based with a
adequate audit trail.   
Medium Yes Work is ongoing to
achieve this target,
governance is being
considered across the
whole system.
Head of Service 29 Feb 24
Risk Ratings for Recommendations
High  Medium   Low 
No. Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09MAY23
Responsible
Officer
Timescale for
Implementation 
8.  Contracts Register
2.8.1 To develop an expenditure
contracts database. 
High Yes Liaison work is continuing
with procurement to align
the contract data base and
the procurement data
base.   
Service
Manager 
31 Aug 24
2.8.2 The database should be
monitored, reviewed and
routinely updated. 
High Yes The Contract database is
a protected document.
Senior Commissioning
Officers carries out 3
monthly checks for
accuracy,  
Service
Managers
31 Aug 24
Page 157

Page 158

Moray Integration Joint Board
Commissioning Service 
10 
Performance Management System 
Commissioning
Departmental database is
reviewed and redesigned
and is in operation. 
Service Manager to do
spot check on regular
basis. 
2.8.3  Contract database will be
shared and made available to
all staff involved in the
commissioning process.    
Meetings are set up to
share the database with
the team.
Service
Manager 
31 Aug 24
Risk Ratings for Recommendations
High  Medium   Low 
No. Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09MAY23
Responsible
Officer
Timescale for
Implementation 
9. Performance Management System (PMP)
Page 158

Page 159

Moray Integration Joint Board
Commissioning Service 
11 
Contract Review 
Block Contracts  
2.9.1 To have a performance
management system in place. 
High Yes A performance
management system will
be tied in with the audit
process.  
Service
Manager 
29 Feb 24
Risk Ratings for Recommendations
High  Medium   Low 
No. Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09MAY23
Responsible
Officer
Timescale for
Implementation 
10. Contract Review
2.10.1 Implement a regular contract
review procedure that assesses
the suitability of providers.
Medium Yes Contract Management &
Review process in use.  
Service
Manager
31 Aug 23
Risk Ratings for Recommendations
High  Medium   Low 
No. Audit Recommendation Priority Accepted
(Yes/ No)
Progress Update as at
09MAY23
Responsible
Officer
Timescale for
Implementation
Page 159

Page 160

Moray Integration Joint Board
Commissioning Service 
12 
11. Block Contracts
2.11.1 Block contracts are appropriately
monitored to ensure that best
value is obtained
Low Yes Contracts are monitored in
line with Contract Review
Monitoring process. 
The process is to be
reviewed.     
Service
Manager 
31 Aug 23
Page 160