Agenda Document Pack - Audit, Performance and Risk Committee - 26/01/2023

Moray Council · 26 January 2023
Back to Audit, Performance and Risk Committee — 26 January 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Audit, Performance and Risk Committee 
Thursday, 26 January 2023 
Council Chambers 
NOTICE IS HEREBY GIVEN that a Meeting of the Audit, Performance and Risk
Committee, Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Thursday, 26 January 2023 at 09:00 to consider the business noted below. 
AGENDA 
1. Sederunt 
2. Declaration of Member's Interests 
3. External Auditors Report to Those Charged with
Governance Report
Report by the Interim Chief Financial Officer  
3 - 36
4. Audited Annual Accounts 2021-22 37 - 102 
Page 1

Page 2

MORAY INTEGRATION JOINT BOARD 
SEDERUNT 
Councillor Scott Lawrence  (Chair)  
Mr Derick Murray  (Voting Member)
Mr Sandy Riddell  (Voting Member)
Councillor John Divers  (Voting Member)
Mr Sean Coady  (Member)
Mr Graham Hilditch  (Member)
Mr Simon Bokor-Ingram  (Member)
Ms Sonya Duncan  (Member)
Ms Deborah O'Shea  (Member)  
Mr Stuart Falconer  (Non-Voting Member) 
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 2

Page 3

REPORT TO:   MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 26 JANUARY 2023 
SUBJECT: EXTERNAL AUDITORS’ REPORT TO THOSE CHARGED WITH
GOVERNANCE 
BY:  INTERIM CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1 To request the Audit, Performance and Risk Committee consider the reports
to those charged with governance from the Board’s External Auditor for the
year ended 31 March 2022. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee considers and notes the reports
from the External Auditor within APPENDICES 1 and 2. 
3. BACKGROUND 
3.1 The responsibilities of Audit Scotland as the independent auditor are
established by the Local Government (Scotland) Act 1973, the code of Audit
Practice (2016), which can be found at https://www.audit-
scotland.gov.uk/uploads/docs/report/2016/code_audit_practice_16.pdf and
supplementary guidance, and are supported by the auditing profession’s
ethical guidance. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The work carried out by Audit Scotland during 2021/22 has produced two
reports that are subject to the consideration of those charged with
governance.  The reports are attached as follows: 
• Independent Auditors Report to those charged with governance
(APPENDIX 1)
• The Annual Audit Report 2021/22 (APPENDIX 2) 
4.2 The audit opinions expressed were all unqualified and are reported within the
‘independent auditors report’ included within APPENDIX 1. 
Item 3.
Page 3

Page 4

4.3 The Annual Audit Report included at APPENDIX 2 provides an Action Plan
where recommendations for improvement are made, based on the findings of
the review.  These recommendations have been discussed with management
and corresponding actions have been agreed, together with timescales for
completion. 
4.4 The Annual Audit Report provides a summary of the significant audit risks
identified during planning.  The results and conclusions of this work are noted
within the report. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Partners in Care 2022 – 2032”
The work of the external auditor and the production of these reports for
those charged with governance have been completed within the
specified timescales agreed. 
(b) Policy and Legal
The Public Bodies (Joint Working ) (Scotland) Act 2014 requires that the
Moray Integration Joint Board (MIJB) is subject to the audit and accounts
provisions of a body under Section 106 of the Local Government
(Scotland) Act 1973. 
(c) Financial implications
There are no direct financial implications arising from this report. 
(d) Risk Implications and Mitigation
The external auditor, Audit Scotland, through the audit process, provides
assurance to the Board that the Annual Accounts for 2020/21 give a true
and fair view of the financial position.  The Annual Audit Report
highlights risks identified during the audit process and recommendations
for action that have been agreed by management. 
(e) Staffing Implications
None arising directly from this report. 
(f) Property
None arising directly from this report 
(g) Equalities/Socio Economic Impact
None arising directly from this report as there has been no resultant
policy change. 
(h) Climate Change and Biodiversity Impacts
There are no direct climate change and biodiversity implications as there
has been no change to policy. 
(i) Directions 
None arising directly from this report 
Page 4

Page 5

(j) Consultations
Consultation has taken place between Audit Scotland and the Chief
Financial Officer of the MIJB in preparation of the Annual Audit Report. 
Any comments received have been considered in writing this report. 
6. CONCLUSION 
6.1 The External Auditor has issued an unqualified opinion for the 2021/22
Annual Accounts.  The Annual Audit Report, Independent Auditors’
Report and the Letter of Representation present the full findings. 
Author of Report: Deborah O’Shea, Interim Chief Financial Officer
Background Papers:  with author
Ref: 
Page 5

Page 6

Page 6

Page 7

102 West Port
Edinburgh 
EH3 9DN
8 Nelson Mandela Place
Glasgow 
G2 1BT
The Green House
Beechwood Business Park North
Inverness
IV2 3BL
T: 0131 625 1500
E: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk 
Moray Integration Joint Board  
C/o Moray Council 
High street
Elgin
IV30 1BX                
26 January 2023
Moray Integration Joint Board
Audit of 2021/22 annual accounts 
Independent auditor's report
1.  Our audit work on the 2021/22 annual accounts is now substantially complete. Subject to [the
satisfactory conclusion of the outstanding matters referred to later in this letter and - delete if no
outstanding matter] receipt of a revised set of annual accounts for final review, we anticipate
being able to issue unqualified audit opinions in the independent auditor's report on 26 January
2023.  The proposed report is attached at Appendix A.
Annual audit report
2.  Under International Standards on Auditing in the UK, we report specific matters arising from
the audit of the financial statements to those charged with governance of a body in sufficient
time to enable appropriate action. We present for the Integration Joint Board’s consideration our
draft annual report on the 2021/22 audit. There are no significant findings from our audit of the
financial statements to bring to your attention.  
3.  The report also sets out conclusions from our consideration of the four audit dimensions that
frame the wider scope of public audit as set out in the Code of Audit Practice.
4.  This report will be issued in final form after the annual accounts have been certified.
Unadjusted misstatements
5.  We also report to those charged with governance all unadjusted misstatements which we
have identified during the course of our audit, other than those of a trivial nature and request
that these misstatements be corrected.
6.  We have no unadjusted misstatements to be corrected 
Fraud, subsequent events and compliance with laws and regulations 
7.  In presenting this report to the Audit Committee we seek confirmation from those charged
with governance of any instances of any actual, suspected or alleged fraud; any subsequent
events that have occurred since the date of the financial statements; or material non-
compliance with laws and regulations affecting the entity that should be brought to our attention.
APPENDIX 1
Item 3.
Page 7

Page 8

Representations from Section 95 Officer
8.  As part of the completion of our audit, we are seeking written representations from the Interim
Chief Financial Officer on aspects of the annual accounts, including the judgements and
estimates made.
9.  A draft letter of representation is attached at Appendix B. This should be signed and
returned to us by the Section 95 Officer with the signed annual accounts prior to the
independent auditor’s report being certified. 
Page 8

Page 9

Appendix A: Proposed Independent Auditor’s Report
Independent auditor’s report to the members of Moray Integration
Joint Board and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of
Moray Integration Joint Board for the year ended 31 March 2022 under Part VII
of the Local Government (Scotland) Act 1973. The financial statements
comprise the Comprehensive Income and Expenditure Statement, Movement in
Reserves Statement, Balance Sheet and notes to the financial statements,
including significant accounting policies. The financial reporting framework that
has been applied in their preparation is applicable law and UK adopted
international accounting standards, as interpreted and adapted by the Code of
Practice on Local Authority Accounting in the United Kingdom 2021/22 (the
2021/22 Code).
In my opinion the accompanying financial statements:
• give a true and fair view in accordance with applicable law and the
2021/22 Code of the state of affairs of the body as at 31 March 2022 and
of its income and expenditure for the year then ended; 
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2021/22 Code; and 
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland Act
2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International
Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit
Practice approved by the Accounts Commission for Scotland. My
responsibilities under those standards are further described in the auditor’s
responsibilities for the audit of the financial statements section of my report. I
was appointed under arrangements approved by the Accounts Commission on
10 April 2017. The period of total uninterrupted appointment is six years. I am
independent of the body in accordance with the ethical requirements that are
relevant to my audit of the financial statements in the UK including the Financial
Reporting Council’s Ethical Standard, and I have fulfilled my other ethical
responsibilities in accordance with these requirements. Non-audit services
prohibited by the Ethical Standard were not provided to the body.  I believe that
the audit evidence I have obtained is sufficient and appropriate to provide a
basis for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the
preparation of the financial statements is appropriate. Page 9

Page 10

Based on the work I have performed, I have not identified any material
uncertainties relating to events or conditions that, individually or collectively,
may cast significant doubt on the body’s ability to continue to adopt the going
concern basis of accounting for a period of at least twelve months from when
the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the
body’s current or future financial sustainability. However, I report on the body’s
arrangements for financial sustainability in a separate Annual Audit Report
available from the Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of
material misstatement that I identified and my judgements thereon.
Responsibilities of the Interim Chief Financial Officer and Moray
Integration Joint Board for the financial statements
As explained more fully in the Statement of Responsibilities, the Interim Chief
Financial Officer is responsible for the preparation of financial statements that
give a true and fair view in accordance with the financial reporting framework,
and for such internal control as the Interim Chief Financial Officer determines is
necessary to enable the preparation of financial statements that are free from
material misstatement, whether due to fraud or error.
In preparing the financial statements, the Interim Chief Financial Officer is
responsible for assessing the body’s ability to continue as a going concern,
disclosing, as applicable, matters related to going concern and using the going
concern basis of accounting unless there is an intention to discontinue the
body’s operations.
The Moray Integration Joint Board is responsible for overseeing the financial
reporting process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial
statements as a whole are free from material misstatement, whether due to
fraud or error, and to issue an auditor’s report that includes my opinion. 
Reasonable assurance is a high level of assurance, but is not a guarantee that
an audit conducted in accordance with ISAs (UK) will always detect a material
misstatement when it exists. Misstatements can arise from fraud or error and
are considered material if, individually or in the aggregate, they could
reasonably be expected to influence the decisions of users taken on the basis
of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and
regulations. I design procedures in line with my responsibilities outlined above
to detect material misstatements in respect of irregularities, including fraud.
Procedures include:
• obtaining an understanding of the applicable legal and regulatory
framework and how the body is complying with that framework; 
Page 10

Page 11

• identifying which laws and regulations are significant in the context of the
body; 
• assessing the susceptibility of the financial statements to material
misstatement, including how fraud might occur; and 
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance with
laws and regulations.
The extent to which my procedures are capable of detecting irregularities,
including fraud, is affected by the inherent difficulty in detecting irregularities,
the effectiveness of the body’s controls, and the nature, timing and extent of the
audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than
irregularities that result from error as fraud may involve collusion, intentional
omissions, misrepresentations, or the override of internal control. The capability
of the audit to detect fraud and other irregularities depends on factors such as
the skilfulness of the perpetrator, the frequency and extent of manipulation, the
degree of collusion involved, the relative size of individual amounts
manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial
statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of my
auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited
part of the Remuneration Report
I have audited the part of the Remuneration Report described as audited. In my
opinion, the audited part of the Remuneration Report has been properly
prepared in accordance with The Local Authority Accounts (Scotland)
Regulations 2014.
Other information 
The Interim Chief Financial Officer is responsible for other information in the
annual accounts. The other information comprises the Management
Commentary, Annual Governance Statement, Statement of Responsibilities and
the unaudited part of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider
whether the other information is materially inconsistent with the financial
statements or my knowledge obtained in the course of the audit or otherwise
appears to be materially misstated. If I identify such material inconsistencies or
apparent material misstatements, I am required to determine whether this gives
rise to a material misstatement in the financial statements themselves. If, based
on the work I have performed, I conclude that there is a material misstatement
of this other information, I am required to report that fact. I have nothing to
report in this regard. 
Page 11

Page 12

My opinion on the financial statements does not cover the other information and
I do not express any form of assurance conclusion thereon except on the
Management Commentary and Annual Governance Statement to the extent
explicitly stated in the following opinions prescribed by the Accounts
Commission.
Opinions prescribed by the Accounts Commission on the Management
Commentary and Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and 
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or 
• the financial statements and the audited part of the Remuneration Report
are not in agreement with the accounting records; or 
• I have not received all the information and explanations I require for my
audit.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the
wider scope responsibilities specified in the Code of Audit Practice, including
those in respect of Best Value, are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance
with Part VII of the Local Government (Scotland) Act 1973 and for no other
purpose. In accordance with paragraph 120 of the Code of Audit Practice, I do
not undertake to have responsibilities to members or officers, in their individual
capacities, or to third parties. 
Brian Howarth ACMA CGMA  
Audit Director
Audit Scotland
Page 12

Page 13

4th Floor
8 Nelson Mandela Place
Glasgow
G2 1BT 
26 January 2023 
Page 13

Page 14

Appendix B: Letter of Representation (ISA 580)
Brian Howarth, Audit Director
Audit Scotland
4th Floor
8 Nelson Mandela Place
Glasgow 
G2 1BT
26 January 2023              
Dear Brian
Moray Integration Joint Board
Annual Accounts 2021/22
1.  This representation letter is provided in connection with your audit of the annual accounts of
Moray Integration Joint Board for the year ended 31 March 2022 for the purpose of expressing
an opinion as to whether the financial statements give a true and fair view in accordance with
the financial reporting framework, and for expressing other opinions on the remuneration report,
management commentary and annual governance statement.
2.  I confirm to the best of my knowledge and belief and having made appropriate enquiries of
the Chief Officer and Senior Management Team, the following representations given to you in
connection with your audit of Moray Integration Joint Board's annual accounts for the year
ended 31 March 2022.
General
3.  Moray Integration Joint Board and I have fulfilled our statutory responsibilities for the
preparation of the 2021/22 annual accounts. All the accounting records, documentation and
other matters which I am aware are relevant to the preparation of the annual accounts have
been made available to you for the purposes of your audit. All transactions undertaken by Moray
Integration Joint Board have been recorded in the accounting records and are properly reflected
in the financial statements. 
4.  I confirm that I am not aware of any uncorrected misstatements.   
Financial Reporting Framework
5.  The annual accounts have been prepared in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2021/22 (2021/22 Code), mandatory guidance from
LASAAC, and the requirements of the Local Government (Scotland) Act 1973, the Local
Government in Scotland Act 2003 and The Local Authority Accounts (Scotland) Regulations
2014.
6.  In accordance with the 2014 regulations, I have ensured that the financial statements give a
true and fair view of the financial position of the Moray Integration Joint Board at 31 March 2022
and the transactions for 2021/22. 
Page 14

Page 15

Accounting Policies & Estimates
7.  All significant accounting policies applied are as shown in the notes to the financial
statements. The accounting policies are determined by the 2021/22 Code, where applicable.
Where the Code does not specifically apply, I have used judgement in developing and applying
an accounting policy that results in information that is relevant and reliable. All accounting
policies applied are appropriate to Moray Integration Joint Board’s circumstances and have
been consistently applied.
8.  The significant assumptions used in making accounting estimates are reasonable and
properly reflected in the financial statements. Judgements used in making estimates have been
based on the latest available, reliable information. Estimates have been revised where there are
changes in the circumstances on which the original estimate was based or as a result of new
information or experience.
Going Concern Basis of Accounting
9.  I have assessed Moray Integration Joint Board's ability to continue to use the going concern
basis of accounting and have concluded that it is appropriate. I am not aware of any material
uncertainties that may cast significant doubt on Moray Integration Joint Board's ability to
continue as a going concern. 
Fraud
10.  I have provided you with all information in relation to 
• my assessment of the risk that the financial statements may be materially misstated as
a result of fraud 
• any allegations of fraud or suspected fraud affecting the financial statements
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements. 
Laws and Regulations
11.  I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements.
Related Party Transactions
12.  All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with the 2021/22 Code. I have made
available to you the identity of all the Moray Integration Joint Board's related parties and all the
related party relationships and transactions of which I am aware.
Remuneration Report
13.  The Remuneration Report has been prepared in accordance with the Local Authority
Accounts (Scotland) Regulations 2014, and all required information of which I am aware has
been provided to you. 
Page 15

Page 16

Management commentary
14.  I confirm that the Management Commentary has been prepared in accordance with the
statutory guidance and the information is consistent with the financial statements. 
Corporate Governance
15.  I confirm that the Moray Integration Joint Board has undertaken a review of the system of
internal control during 2021/22 to establish the extent to which it complies with proper practices
set out in the Delivering Good Governance in Local Government: Framework 2016. I have
disclosed to you all deficiencies in internal control identified from this review or of which I am
otherwise aware.
16.  I confirm that the Annual Governance Statement has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework 2016 and the information is
consistent with the financial statements. There have been no changes in the corporate
governance arrangements or issues identified, since 31 March 2022, which require to be
reflected. 
Balance Sheet
17.  All events subsequent to 31 March 2022 for which the 2021/22 Code requires adjustment or
disclosure have been adjusted or disclosed. 
Yours sincerely 
Interim Chief Financial Officer
Page 16

Page 17

Prepared for Moray Integration Joint Board and the Controller of Audit 
January 2023
Moray Integration
Joint Board
DRAFT 2021/22 Annual Audit Report 
APPENDIX 2
Item 3.
Page 17

Page 18

Moray Integration Joint Board DRAFT 2021/22 Annual Audit Report | 2
Contents 
Key messages 3
Introduction 4
1. Audit of 2021/22 annual accounts 7
2. Financial management and sustainability 10
3. Governance, transparency, and Best Value 14
Appendix 1. Action plan 2021/22 17
Appendix 2. National reports and briefing papers 19
Page 18

Page 19

Key messages | 3 
Key messages 
2021/22 annual accounts 
1 Our audit opinions on the annual accounts of the Moray Integration Joint
Board are unmodified and there were no significant issues.
Financial management and sustainability 
2 The IJB reported an overall underspend of £10.7 million against a revised
budget of £170.8 million. 
3 Covid-19 funding of £11.7 million was received in 2021/22; £6.7 million was
unspent at 31 March 2022 and is included in reserves 
4 Medium term financial plans were updated during 2021/22. The IJB is
projecting a budget deficit of £12.1 million over the period from 2023-27. 
Governance, Transparency and Best Value
5 The IJB has yet to develop processes to evaluate and measure Best Value
6 The IJB effectively monitors performance and indicators show mixed
performance
Page 19

Page 20

Key messages | 4 
Introduction 
1.  This report summarises the findings arising from the 2021/22 audit of Moray
Integration Joint Board (the IJB). 
2.  The scope of the audit was set out in our 2021/22 Annual Audit Plan which
was presented to the Board on 26 May 2022.
3.  This report comprises the findings from: 
• the audit of the Moray IJB’s annual accounts
• consideration of the four audit dimensions that frame the wider scope of
public audit set out in the Code of Audit Practice 2016 
• a review of the arrangements put in place by the IJB to secure Best
Value.
4.  The global coronavirus pandemic has had a considerable impact on the IJB
during 2021/22. We did not identify any significant audit risks related to the
pandemic for 2021/22.
Adding value through the audit
5.  We add value to the IJB, through the audit by:
• identifying and providing insight on significant risks, and making clear
and relevant recommendations 
• sharing intelligence and good practice through our national reports
(Appendix 2) and good practice guides 
• providing clear and focused conclusions on the appropriateness,
effectiveness and impact of corporate governance, performance
management arrangements and financial sustainability.
Responsibilities and reporting
6.  The IJB has primary responsibility for ensuring the proper financial
stewardship of public funds. This includes preparing annual accounts that are in
accordance with proper accounting practices. The IJB is also responsible for
compliance with legislation and putting arrangements in place for governance
and propriety that enable it to successfully deliver its objectives.
7.  Our responsibilities as independent auditor appointed by the Accounts
Commission are established by the Local Government in Scotland Act 1973, the
Page 20

Page 21

Key messages | 5 
Code of Audit Practice 2016 and supplementary guidance, and International
Standards on Auditing in the UK.
8.  As public sector auditors we give independent opinions on the annual
accounts. Additionally, we conclude on:
• the effectiveness of the IJB’s performance management arrangements, 
• the suitability and effectiveness of corporate governance arrangements, 
• the financial position and arrangements for securing financial
sustainability, and
• Best Value arrangements. 
9.   Further details of the respective responsibilities of management and the
auditor can be found in the Code of Audit Practice 2016. and supplementary
guidance.
10.  This report raises matters from our audit. Weaknesses or risks identified are
only those which have come to our attention during our normal audit work and
may not be all that exist. Communicating these does not absolve management
from its responsibility to address the issues we raise and to maintain adequate
systems of control.
11.  Our annual audit report contains an agreed action plan at Appendix 1
setting out specific recommendations, responsible officers, and dates for
implementation. It also includes outstanding actions from last year and the
steps being taken to implement them.
Auditor Independence 
12.  Auditors appointed by the Accounts Commission or Auditor General must
comply with the Code of Audit Practice and relevant supporting guidance. When
auditing the financial statements auditors must comply with professional
standards issued by the Financial Reporting Council and those of the
professional accountancy bodies. 
13.  We can confirm that we comply with the Financial Reporting Council’s
Ethical Standard. We can also confirm that we have not undertaken any non-
audit related services and the 2021/22 audit fee of £27,960 as set out in our
2021/22 Annual Audit Plan remains unchanged. We are not aware of any
relationships that could compromise our objectivity and independence.
14.  This report is addressed to both the IJB and the Controller of Audit and will
be published on Audit Scotland's website www.audit-scotland.gov.uk. 
Audit appointment from 2022/23
15.  The Accounts Commission is responsible for the appointment of external
auditors to local government bodies. External auditors are usually appointed for
a five-year term either from Audit Scotland’s Audit Services Group or a private
firm of accountants. The current appointment round was due to end in 2020/21
Page 21

Page 22

Key messages | 6 
but this was extended for a year so that 2021/22 is the last year of the current
appointment round.
16.  The procurement process for the new round of audit appointments was
completed in May 2022. From financial year 2022/23 Grant Thornton will be the
appointed auditor for Moray Integration Joint Board. We are working closely
with the new auditors to ensure a well-managed transition.
17.  We would like to thank Board members, Audit, Performance and Risk
Committee members, the Chief Officer and the Interim Chief Finance Officer for
their co-operation and assistance over the last six years. 
Page 22

Page 23

1. Audit of 2021/22 annual accounts | 7 
1. Audit of 2021/22 annual
accounts
The principal means of accounting for the stewardship of resources and
performance 
Main judgements
Our audit opinions on the annual accounts of the Moray Integration Joint Board
are unmodified and there were no significant issues. 
Our audit opinions on the annual accounts are unmodified 
18.  The IJB’s annual accounts for the year ended 31 March 2022 were
approved by the Integration Joint Board on 26 January 2023.  As reported in the
independent auditor’s report:
• the financial statements give a true and fair view and were properly
prepared in accordance with the financial reporting framework 
• the audited part of the Remuneration Report, Management
Commentary and the Annual Governance Statement were all consistent
with the financial statements and properly prepared in accordance with
the relevant regulations and guidance.
The annual accounts were submitted for audit by the statutory
dates
19.  The unaudited annual accounts were received in line with our agreed audit
timetable on 30 June 2022.
20.  The working papers provided with the unaudited accounts were of a good
standard and finance staff provided support to the audit team during the audit.
There were no objections raised to the annual accounts 
21.  The Local Authority Accounts (Scotland) Regulations 2014 require local
government bodies to publish a public notice on its website that includes details
of the period for inspecting and objecting to the accounts. This must remain on
the website throughout the inspection period. There were no objections to the
2021/22 annual accounts.
Page 23

Page 24

1. Audit of 2021/22 annual accounts | 8 
Overall materiality is £1.4 million
22.  We apply the concept of materiality in both planning and performing the
audit and in evaluating the effect of identified misstatements on the audit and of
uncorrected misstatements, if any, on the financial statements and in forming
the opinion in the auditor’s report. We identify a benchmark on which to base
overall materiality, such as gross expenditure, and apply what we judge to be
the most appropriate percentage level for calculating materiality values. 
23.   The determination of materiality is based on professional judgement and is
informed by our understanding of the entity and what users are likely to be most
concerned about in the annual accounts. In assessing performance materiality,
we have considered factors such as our findings from previous audits, any
changes in business processes and the entity’s control environment including
fraud risks. 
24.  Our initial assessment of materiality for the annual accounts was carried out
during the planning phase of the audit. This was reviewed on receipt of the
unaudited annual accounts and is summarised in Exhibit 1. 
Exhibit 1
Materiality values 
Materiality level Amount
Overall materiality  £1.4 million
Performance materiality £1.1 million
Reporting threshold £75,000
Source: Audit Scotland
We have no significant findings to report on the audited annual
accounts 
25.  International Standard on Auditing (UK) 260 requires us to communicate
significant findings from the audit to those charged with governance, including
our view about the qualitative aspects of the body’s accounting practices. We
have no issues to report from the audit. 
We have obtained assurance over the significant risks
identified in our Annual Audit Plan
26.  Exhibit 2 sets out the significant risks of material misstatement to the
financial statements we identified in our 2021/22 Annual Audit Plan. It
summarises the further audit procedures we performed during the year to obtain
assurances over these risks and the conclusions from the work completed.
Page 24

Page 25

1. Audit of 2021/22 annual accounts | 9 
Exhibit 2
Significant risks of material misstatement in the financial statements
Audit risk Assurance procedure Results and conclusions
1. Management override of
controls
As stated in International
Standard on Auditing 240,
management is in a unique
position to perpetrate fraud
because of management’s
ability to manipulate
accounting records and
prepare fraudulent financial
statements by overriding
controls that otherwise are
operating effectively. 
Agreement of balances and
transactions to Moray Council
and NHS Grampian financial
reports / ledger /
correspondence
Service auditor assurances
obtained from the external
auditors of Moray Council
and NHS Grampian over the
completeness, accuracy and
allocation of income and
expenditure.
Review of adjustments at
year end.
Review of financial
monitoring reports during the
year.
Results & Significant
Judgements: We agreed the
figures in the CIES, Balance
Sheet and Movement in
Reserves Statement to ledger
information.  
We obtained the relevant
assurances from the auditors
of Moray Council and NHS
Grampian.
We undertook detailed testing
of year-end adjustments.
We reviewed financial
monitoring reports that were
prepared throughout the year.
Conclusion: We did not
identify any incidents of
management override of
controls. 
There were no identified misstatements in the audited annual
accounts  
27.  It is our responsibility to request that all misstatements, other than those
below the reporting threshold, are corrected. However, the final decision on
making the correction lies with those charged with governance considering
advice from senior officers and materiality. There were no misstatements
identified that exceeded our reporting threshold. 
The IJB has made limited progress in implementing our prior
year audit recommendations. 
28.  Limited progress has been made in implementing our prior year audit
recommendations with two out of three still outstanding.  For actions not yet
implemented, revised responses and timescales have been agreed with
management, and are set out in Appendix 1. 
Page 25

Page 26

2. Financial management and sustainability | 10 
2. Financial management and
sustainability
Financial management is about financial capacity, sound budgetary
processes and whether the control environment and internal controls
are operating effectively. 
Financial sustainability looks forward to the medium and long term to
consider whether the council is planning effectively to continue to
deliver its services or the way in which they should be delivered.
Main judgements
The IJB underspent by £10.7 million in 2021/22. 
Covid-19 funding of £11.7 million was received in 2021/22; £6.7 million was
unspent at 31 March 2022 and is included in reserves. 
Medium -term financial plans have been developed and these have been updated
to reflect the impact of Covid-19. The IJB has identified a cumulative budget deficit
of £12.1 million over the period from 2023-27.
The 2021/22 budget included planned savings and
contributions from reserves 
29.  The IJB approved its 2021/22 budget on 25 March 2021. The budget was
set at net expenditure of £140.7 million with a funding gap of £1.5 million. Plans
to address the gap included efficiency savings of £0.4 million and use of
reserves of £1.1 million. 
The IJB underspent by £10.7 million in 2021/22 and received 
£11.7 million Covid-19 funding
30.  The final 2021/22 budget was £170.8 million. The increase was due to
additional non-recurring funding received from NHS Grampian during the year,
with the most significant increase relating to £11.7 million of Covid-19 grants.
31.  The IJB returned an underspend of £10.7 million against a budgeted
breakeven position (Exhibit 3). The underspend was made up of an overspend
of £2.5 million on core services and an underspend of £13.2 million on Strategic
Fund schemes funded by the Scottish Government. 
Page 26

Page 27

2. Financial management and sustainability | 11 
Exhibit 3
Performance against budget 
IJB budget summary Budget
£m
Actual
£m
Variance
£m
Gross Core Expenditure 170.8 153.8 (17.0)
Total Income (169.7) (164.5) 5.2
In-year expenditure met from reserves 1.1 0.0 1.1
(Surplus)/Deficit in annual accounts 0.0 (10.7) (10.7)
Source: MIJB 2021/22 budget monitoring reports and annual accounts
Budget processes were appropriate 
32.   Detailed budget monitoring reports were submitted to the IJB Board
throughout the year. The outturn to date and projected year-end outturn
position, alongside revisions to the budget were clearly stated in these reports
while the actual year-end outturn position was in line with expectations. 
33.  The content of the budget monitoring reports was updated to reflect the
financial impact of Covid-19 and an additional section was included in the
outturn report that highlighted spend on the Local Mobilisation Plan developed
in response to Covid-19. This ensured the IJB were aware of how Covid-19
impacted on the overall financial position and outturn. 
34.  We observed that senior management and members receive regular and
accurate financial information on the IJB’s financial position and have concluded
the IJB has appropriate budget monitoring arrangements. 
75% of savings were achieved but it is becoming increasingly
challenging to identify further savings
35.  The IJB is required to make efficiency savings to maintain financial balance.
The total savings target for 2021/22 was £0.4 million. The IJB achieved £0.3
million (75%) of planned savings. The Scottish Government provided additional
Covid funding that covered the £0.1 million of savings not achieved.  
36.  The 2022/23 Revenue Budget Report was presented to the IJB on 31
March 2022. The budget was set at £155.2 million and includes £12.6 million
Set Aside and £4.9 million to support commitments in relation to the Carers Act
and ring-fenced investment to support increasing demand. There is excess
Page 27

Page 28

2. Financial management and sustainability | 12 
funding over planned expenditure of £0.2 million. The budget includes planned
efficiencies of £0.1 million. The IJB considers this to be achievable but has
acknowledged the challenges it faces in identifying further savings. 
Total reserves are £17 million at the year end with most of this
earmarked for specific purposes
37.  With the £10.7 million surplus achieved in 2021/22, the balance on the
General Fund was £17 million at 31 March 2022. The majority of the year end
reserves balance (£15.8 million) is held as earmarked reserves for specific
purposes. These include £9 million to be spent on Covid-19 and £2.3 million for
the Primary Care Improvement Plan. The remaining £1.3 million has been
included in uncommitted reserves and will be used as part of the 2022/23
budget. 
The IJB has a medium-term financial plan but has yet to
develop a longer-term plan 
38.  Financial sustainability looks forward to the medium and longer term to
consider whether the body is planning effectively to continue to deliver its
services or the way in which they should be delivered. 
39.  During 2021/22, the IJB updated its Reserves Policy. While the Policy does
not set a minimum level of reserves the IJB should hold, it does require that a
prudent amount should be held and should be reviewed annually considering
the prevailing financial environment.
40.  As part of the 2022/23 budget setting process, the Medium-Term Financial
Framework was updated and presented the Board in March 2022. This covers
the period from 2022/23 to 2026/27. The updated framework identified Covid-19
as a significant risk around its budgeting in coming years, as well as the
challenges of the current economic climate and labour market challenges. The
plan forecasts an increasing deficit over the five years, with a cumulative deficit
of £12.1 million forecast over the five years to 2026/27. 
41.  The IJB’s Strategic Plan 2022-2032 was presented to the Board in
November 2022. The Medium-Term Financial Framework is currently being
reviewed to ensure financial planning is aligned with the Strategic Plan. 
Financial systems of internal control operated effectively 
42.  The IJB does not have its own financial systems and instead relies on
partner bodies’ financial systems. All financial transactions are therefore
processed under the partner bodies’ internal controls.
43.  As part of our audit approach, we sought assurances from the external
auditor of NHS Grampian and Moray Council. Some control weaknesses were
identified within Moray Council and the auditors undertook additional audit
procedures to obtain the assurances required for their audit opinions. No issues
were identified from completion of these additional procedures that affect our
overall opinion on the IJB accounts. 
Page 28

Page 29

2. Financial management and sustainability | 13 
Standards of conduct and arrangements for the prevention and
detection of fraud and error were appropriate 
44.   The IJB does not maintain its own policies relating to the prevention and
detection of fraud and error but instead depends on those in place at its partner
bodies. We reviewed the arrangements in place at Moray Council and NHS
Grampian and found them to be adequate. The IJB has a Code of Conduct in
place to which members subscribe and the Members’ Registers of Interest are
publicly available on the IJB’s website. 
45.  Appropriate arrangements are in place for the prevention and detection of
fraud and error. We are not aware of any specific issues we require to bring to
your attention. 
Page 29

Page 30

3. Governance, transparency, and Best Value | 14 
3. Governance, transparency,
and Best Value
The effectiveness of scrutiny and oversight and transparent reporting of
information. 
Using resources effectively and continually improving services. 
Main Judgements
The governance arrangements are appropriate and operate effectively   
The IJB has yet to develop processes to evaluate and measure Best Value 
The IJB effectively monitors performance and indicators show mixed performance
Governance arrangements are appropriate and operate
effectively 
46.  Board and Audit, Performance and Risk Committee meetings were held
remotely while restrictions were in place as a result of the Covid 19 pandemic.
This continued through 2021/22 but in person meeting resumed in September
2022. Full details of the meetings held by the IJB are available on the IJB’s
website. Committee papers and minutes of meetings are publicly available.
Public notice of each meeting is available via the IJB’s website.
47.  CIPFA has produced a good practice guide on audit committees which
recommends these committees should report annually on their performance to
those charged with governance.  The good practice guide includes a self-
assessment checklist for audit committees to help them do this.  We reported
previously that the IJB’s Audit, Performance and Risk Committee had not
completed this assessment. The assessment has still not been completed and
this is reflected in Appendix 1 and our follow up of prior year actions. 
48.  We consider that governance arrangements are appropriate and support
effective scrutiny, challenge and decision making.
The IJB has yet to develop processes to evaluate and measure
Best Value 
49.  Integration Joint Boards have a statutory duty to have arrangements to
secure Best Value. To achieve this, IJBs should have effective processes for
Page 30

Page 31

3. Governance, transparency, and Best Value | 15 
scrutinising performance, monitoring progress towards their strategic objectives,
and holding partners to account. 
50.  The IJB clearly recognises the importance of securing best value, with this
being highlighted in its ten-year Strategic Plan. A self-evaluation exercise on the
importance of securing best value, reported in June 2019, highlighted the need
to ‘develop better processes to evaluate and measure outcomes in line with
Best Value’. This self-evaluation and the resulting action plan were revisited in
April 2021 and an updated improvement action plan was approved in June
2021. Progress against this plan was reported to the IJB meeting in January
2022 and a development session was held for members in February 2022.  
51.  In prior years we have recommended that the IJB should develop its own
assessment of Best Value. We have been advised that this work progressed
during 2021/22 but was not completed due to changes in key staff. A revised
action and timescale for completion have been agreed with management, and
are set out in Appendix 1 in our follow-up of prior year recommendations. 
The IJB effectively monitors performance and indicators show
mixed performance
52.  The Public Bodies (Joint Working) (Scotland) Act 2014 requires the IJB to
produce an annual performance report covering areas such as assessing
performance in relation to national health and wellbeing outcomes, financial
performance and best value, reporting on localities, and the inspection of
services.  The 2021/22 Annual Performance Report was presented to the Audit,
Performance and Risk Committee on 24 November 2022 and, following
approval, has been published on the IJB’s website.     
53.  The Board has continued to monitor key performance targets throughout
the year with quarterly performance reports presented to the Audit, Performance
and Risk Committee during 2021/22. Performance is measured using a RAG
(red / amber / green) system against each of the IJB’s ten local indicators which
are aligned to its Strategic Plan.
54.  The most recent quarterly performance report (presented to the committee
in August 2022) showed three of the indicators as being green, two amber and 
five red.  
55.  The five red indicators relate to: 
• A&E attendance rate per 1,000 of the population
• number of delayed discharges at the end of the quarter 
• number of beds days occupied by delayed discharges
• rate of emergency occupied bed days for over 65s per 1,000 of the
population
• percentage of patients commencing Psychological Therapy Treatment
within 18 weeks of referral.
Page 31

Page 32

3. Governance, transparency, and Best Value | 16 
56.  Delayed discharge indicators are showing an increasing trend. Work is
ongoing to reduce these numbers and action taken in 2021/22 includes the
introduction of twice weekly meetings to scrutinise the delayed discharge
workflow and a new contract for Care at Home service provision being put in
place. The IJB recognises the significant challenges in addressing issues
around delayed discharges. 
National performance audit reports
57.  Audit Scotland carries out a national performance audit programme on
behalf of the Accounts Commission and the Auditor General for Scotland.
During 2021/22 we published some reports which may be of interest to the IJB
as outlined in Appendix 2. 
Page 32

Page 33

Appendix 1. Action plan 2021/22 | 17 
Appendix 1. Action plan
2021/22 
Follow-up of prior year recommendations 
Issue/risk Recommendation  Agreed management
action/timing
B/F 1. Audit, Performance
and Risk committee
2020/21 AAR
CIPFA recommends that
audit committees report
annually on their performance
to those charged with
governance.  CIPFA’s good
practice guide includes a
checklist for audit committees
to use as part of their
assessment of performance.
The IJB’s Audit, Performance
and Risk Committee has yet
to assess its performance.
Risk: the Audit, Performance
and Risk Committee is not
complying with good practice
and cannot evidence its
effectiveness.
The Audit, Performance and
Risk Committee should
assess its performance using
the CIPFA self-assessment
checklist and report annually
to the IJB on its performance.
Outstanding
The assessment has still not
been completed 
Revised action:
Complete self-assessment at
year end and then embed this
as part of business cycle.
Responsible officer:
Corporate Manager
Revised date:
30 April 2023
B/F 2. Medium-term
financial plan 
The IJB now has a medium-
term financial plan that spans
the period 2019/20 to
2023/24 but this will need to
be updated to reflect the
impact of Covid-19 and EU
withdrawal.
Risk: the financial planning
assumptions in the medium-
term plan may now be
inaccurate.
The IJB’s medium-term
financial plan should be
reviewed due to the impact of
Covid-19 and EU withdrawal.
2020/21 Update: the IJB’s
Strategic Plan and suite of
other supporting documents
should also be reviewed.
Complete
An updated medium-term
financial framework has been
completed and identified
Covid-19 as a significant risk
with assumptions made to
include recurring SG funding
in the figures. EU withdrawal
isn’t specifically mentioned
but labour challenges and
wider economic challenges
are. 
Page 33

Page 34

Appendix 1. Action plan 2021/22 | 18 
Issue/risk Recommendation  Agreed management
action/timing
A new Strategic Plan
covering the period 2022 to
2032 was approved at the
November 2022 meeting of
the Board.
B/F 3. Self-evaluation
exercise
A self-evaluation exercise
was undertaken and
presented to the Board in
June 2019. It included 11
areas for improvement,
including the need to ‘develop
better processes to evaluate
and measure outcomes in
line with Best Value’. There
has been no update provided
to the Board on the progress
against implementing these
areas for improvement.
Risk: the IJB is unable to
demonstrate how it delivers
Best Value.
The IJB should develop its
own assessment of Best
Value.
Outstanding 
Work to develop the IJB’s
assessment of Best Value
progressed during 2021/22
but was not completed due to
changes in key staff.
Revised action:
Seek out examples of good
practice from other IJBs and
shape for use for Moray,
presenting the model to the
IJB.
Responsible officer:
Interim Chief Finance Officer
Revised date:
31 March 2023 
Page 34

Page 35

Appendix 2. National reports and briefing papers | 19 
Appendix 2. National reports
and briefing papers 
May
Local government in Scotland Overview 2021
June
Covid 19: Personal protective equipment
July
Community justice: Sustainable alternatives to custody
September
Covid 19: Vaccination programme
January
Planning for skills
Social care briefing
February
NHS in Scotland 2021
March
Local government in Scotland: Financial Overview 20/21
Drug and alcohol: An update
Scotland’s economy: Supporting businesses through the Covid 19 pandemic 
Page 35

Page 36

Appendix 2. National reports and briefing papers | 20  
Moray Integration Joint Board
Draft 2021/22 Annual Audit Report 
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
AS.4.0 
Page 36

Page 37

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 26 JANUARY 2023 
SUBJECT: 2021/22 AUDITED ANNUAL ACCOUNTS 
BY:  INTERIM CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1 To submit to the Audit, Performance and Risk Committee the Audited Annual
Accounts for the year then ended 31 March 2022. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee consider and recommend to the
Moray Integration Joint Board the Audited Annual Accounts for the
financial year 2021/22. 
3. BACKGROUND 
3.1     The Unaudited Annual Accounts for 2021/22 were submitted to the meeting of
the Moray Integration Joint Board (MIJB) on 30 June 2022 prior to submission
to external audit (paragraph 8 of the Minute refers). 
3.2 The Annual Accounts have been prepared in accordance with International
Financial Reporting Standards and the Local Government (Scotland) Act
1973, The Local Authority Accounts (Scotland) Regulations 2014 and the
Local Government in Scotland Act 2003. 
4 KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1     The audit undertaken by the Board’s External Auditors, Audit Scotland is now
complete.  The External Auditors have expressed unqualified opinions in
respect of the financial statements, the remuneration report, the management
commentary and the annual governance statement.  The Independent
Auditor’s Report to the Members of the MIJB and the Accounts Commission is
included within the audited Annual Accounts and can be found on page 41. 
The audited Annual Accounts are attached at APPENDIX 1. 
4.2     The audit process highlighted changes to be made to the accounts which in
the main were presentational and in parallel with expectation following
external audit inspection.
Item 4.
Page 37

Page 38

4.3 The Auditor’s Annual Audit Report to the MIJB and the Accounts Commission
is the subject of a separate report to this meeting.  The report sets out the
responsibilities of Audit Scotland as the independent auditor and presents a
summary of the findings arising from the 2021/22 audit.  The report confirms
there are no unadjusted misstatements in the annual accounts to report to
those charged with governance. 
4.4 The Audited Annual Accounts are presented to this meeting for consideration
and approval.  Thereafter, the Chief Officer, Interim Chief Financial Officer
and the Chair of the Board will sign the accounts prior to submission to Audit
Scotland prior to publication. 
5 SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
The Audited Annual Accounts have been completed within the statutory
timescales permitted under the Coronavirus (Scotland) Act 2021 and are
being presented for consideration and sign off. 
(b) Policy and Legal
The Public Bodies (Joint Working) (Scotland) Act 2014 requires that the
MIJB is subject to the audit and accounts provisions of a body under
Section 106 of the Local Government (Scotland) Act 1973.  In addition,
the Coronavirus (Scotland) Act 2021 has been adhered allowing
statutory reporting deadlines to be flexed. 
(c) Financial implications
The adjustments and revisions made to the Annual Accounts following
the external audit had no financial impact on the MIJB. 
(d) Risk Implications and Mitigation
There are no risk issues arising directly from this report.  The work
undertaken by Audit Scotland provides assurance to the Board that the
Annual Accounts for 2021/22 give a true and fair view in accordance with
applicable law and the 2021/22 Code of the state of affairs of the MIJB 
as at 31 March.
(e) Staffing Implications
None arising directly from this report. 
(f) Property
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
None arising directly from this report as there is no resultant change in
policy. 
(h) Climate Change and Biodiversity Impacts
There are no direct climate change and biodiversity implications as there
has been no change to policy.
Page 38

Page 39

(i) Directions 
None arising directly from this report 
(j) Consultations
In preparation of the Annual Accounts, consultations have taken place
between finance staff of both Moray Council and NHS Grampian who are
in agreement within their areas of responsibility.   The Chief Officer has
been consulted and comments have been considered. 
6 CONCLUSION 
6.1 Following a completed external audit process and an unqualified
opinion being received.  The Audited Annual Accounts are presented
here for approval and formal sign off. 
Author of Report: Deborah O’Shea, Interim Chief Financial Officer
Background Papers:  With author
Ref: 
Page 39

Page 40

Page 40

Page 41

Moray Integration Joint Board Annual Accounts 2021/22 
AUDITED ANNUAL ACCOUNTS
FOR THE YEAR ENDED 31 MARCH 2022 
Moray Integration Joint Board
Item 4.
Page 41

Page 42

Moray Integration Joint Board Annual Accounts 2021/22 
If you need information from the Moray Council in a
different language or format, such as Braille, audio tape
or large print, please contact: 
ياروم سلجم لبق نم تامولعم لىإ ةجاح ي ف متنك اذإ  نوكتو  ةغلب
وأ ويدوأ ةناوطسأ ،يا ربلا لثم فلتخم لكش لىعوأ ةفلتخم  نوكت نأ
مط ب لاصّتلإا ءاجّرلاف ةظيلغ فورح لامعتساب ةعوب 
Jei pageidaujate tarnybos Moray tarybos teikiamą informaciją gauti kitokiu
formatu, pvz., Brailio raštu, garso įrašu ar stambiu šriftu, kreipkitės: 
Jeśli potrzebują Państwo informacji od Rady Okręgu Moray w innym
formacie, takim jak alfabet Braille'a, kasety audio lub druk dużą czcionką,
prosimy o kontakt: 
Se necessitar de receber informações por parte do Concelho de Moray
num formato diferente, como Braille, cassete áudio ou letras grandes,
contacte: 
Ja Jums vajadzīga informācija no Marejas domes (Moray Council) citā
valodā vai formātā, piemēram, Braila rakstā, audio lentā vai lielā drukā,
sazinieties ar: 
ای نابز رگید یسک ےس لسنوک ےروم وک پآرگاتروص    راکرد تامولعم ںیم
لاثم ںوہ ˝    ،فورح ےڑب ای پیٹ ویڈآ ،ےلیربںیئامرف ہطبار رک امرف ینابرہم وت: 
Interim Chief Financial Officer to the Moray Integration
Joint Board, High Street, Elgin, IV30 1BX 
01343 563125   accountancy.support@moray.gov.uk
Page 42

Page 43

Moray Integration Joint Board Annual Accounts 2021/22 
Table of Contents 
MORAY INTEGRATION JOINT BOARD MEMBERS ............................................................ 1
MANAGEMENT COMMENTARY .......................................................................................... 2
STATEMENT OF RESPONSIBILITIES ............................................................................... 24
REMUNERATION REPORT ............................................................................................... 26
ANNUAL GOVERNANCE STATEMENT ............................................................................. 30
INDEPENDENT AUDITOR’S REPORT............................................................................... 41
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT ..................................... 46
MOVEMENT IN RESERVES STATEMENT ........................................................................ 47
BALANCE SHEET .............................................................................................................. 48
NOTES TO THE FINANCIAL STATEMENTS ..................................................................... 49
Note 1 Significant Accounting Policies ............................................................................. 49
Note 2 Critical Judgements and Estimation Uncertainty .................................................. 50
Note 3 Events after the Reporting Period ........................................................................ 51
Note 4 Expenditure and Income Analysis by Nature ........................................................ 51
Note 5 Taxation and Non-Specific Grant Income ............................................................. 52
Note 6 Debtors ................................................................................................................ 52
Note 7 Usable Reserve: General Fund ............................................................................ 53
Note 8 Agency Income and Expenditure .......................................................................... 53
Note 9 Related Party Transactions .................................................................................. 55
Note 10 VAT .................................................................................................................... 57
Note 11 Accounting Standards That Have Been Issued but Have Yet To Be Adopted .... 57 
Page 43

Page 44

Moray Integration Joint Board Annual Accounts 2021/22 1 
MORAY INTEGRATION JOINT BOARD MEMBERS 2021/22 
Voting Members      
Cllr. Shona Morrison (Chair) *  Moray Council
Dennis Robertson (Vice-Chair)  The Grampian Health Board
Sandy Riddell    The Grampian Health Board
Derick Murray    The Grampian Health Board
Professor Siladitya Bhattacharya  The Grampian Health Board
Cllr. Theresa Coull    Moray Council
Cllr. Frank Brown    Moray Council 
Cllr. John Divers    Moray Council
Non-Voting Members
Simon Bokor-Ingram   Interim Chief Officer
Tracey Abdy *    Chief Financial Officer
Jane Mackie     Chief Social Work Officer
Jane Ewen     Lead Nurse
Dr Malcolm Metcalfe   Deputy Medical Director
Dr Lewis Walker    Registered Medical Practitioner
Heidi Tweedie    tsiMoray
Val Thatcher     Public Partnership Forum Representative
Ivan Augustus    Carer Representative
Steven Lindsay                Grampian Health Board Staff Partnership
Karen Donaldson    UNISON, Moray Council
Co-opted Members
Sean Coady     Head of Service and IJB Hosted Services
Dr Paul Southworth    Consultant in Public Health
Professor Caroline Hiscox   The Grampian Health Board
Roddy Burns     Moray Council 
Note * were in position until 31 March 2022
Page 44

Page 45

Moray Integration Joint Board Annual Accounts 2021/22 2 
MANAGEMENT COMMENTARY 
The Role and Remit of the Moray Integration Joint Board 
The Public Bodies (Joint Working) (Scotland) Act 2014 required that Moray Council
and the Grampian Health Board prepared an Integration Scheme for the area of the
local authority detailing the governance arrangements for the integration of health and
social care services.  This legislation resulted in the establishment of the Moray
Integration Joint Board (MIJB) that became operational from 1 April 2016.  Moray
Council and Grampian Health Board, as the parties to the Integration Scheme, each
nominate voting members to the MIJB.  Currently, three elected members from Moray
Council and three Grampian Health Board members (one executive and two non-
executives).   
Under the Public Bodies (Joint Working) (Scotland) Act 2014, a range of health and
social care functions have been delegated from Moray Council and Grampian Health
Board to the MIJB who has assumed responsibility for the planning and operational
oversight of delivery of integrated services.  MIJB also has a role to play in the strategic
planning of unscheduled acute hospital based services provided by Grampian Health
Board as part of the ‘set aside’ arrangements. 
Hosted services also form part of the MIJB budget.  There are a number of services
which are hosted by one of the 3 IJB’s within the Grampian Health Board area on
behalf of all the IJBs.  Responsibilities include the planning and operational oversight
of delivery of services managed by one IJB on a day to day basis.  MIJB has
responsibility for hosting services relating to Primary Care Contracts and the Grampian
Medical Emergency Department (GMED) Out of Hours service. 
Key Purpose and Strategy 
Following review and consultation, our second Strategic Planning (2019-29) –
Partners in Care was launched in December 2019.  The current plan emphasises the
strength of integration and in addition to our two main Partners – Moray Council and
the Grampian Health Board, the MIJB recognises the importance of the Third and
Independent Sectors in facilitating the successful operation of the partnership of
Health & Social Care Moray. As with all health and social care systems Moray is facing
increasing demand for services at the same time as resources – both funding and
workforce availability are under pressure. These challenges will intensify in the coming
years as our population ages and more people with increasing complex needs require
support to meet their health and care needs.  The MIJB sets the direction and strategic
intent through the development and implementation of the Strategic Plan and seeks
assurance on the management and delivery of services through Board level
performance reporting which ensures an appropriate level of scrutiny and challenge. 
The Strategic Plan identifies priority areas to support strategic direction and vision.   
Page 45

Page 46

Moray Integration Joint Board Annual Accounts 2021/22 3 
MANAGEMENT COMMENTARY (continued) 
STRATEGIC PLAN KEY THEMES 
The Plan purposefully places an emphasis on prevention activities and seeks to
prioritise these activities as a long term goal, actively pursuing good health and
wellbeing for the population, this will mean increased investment in this area of work. 
It highlights the HOMEFIRST approach and the rationale for this is to assist people in
understanding that “hospital is not always the best place for people”, a statement
frequently used and in particular if you are frail and elderly can be counter intuitive to
a successful recovery.  The response to Covid-19 has escalated elements of the
HOMEFIRST approach.   
Through 21/22 the pandemic has driven a level of transformational change. This pace
will need to continue in the next year and beyond as we face significant levels of
demand. Our Strategic Plan will be refreshed in 22/23 and will be accompanied by a
delivery plan to reflect the recovery phase that will be needed to deal with day to day
demand and a backlog that has accumulated. 
BUILDING RESILIENCE – Taking greater responsibility for our health and
wellbeing
HOME FIRST – Being supported at home or in a homely setting as far as
possible
PARTNERS IN CARE – Making choices and taking control over decisions
WE ARE PARTNERS IN CARE
OUR VISION: “We come
together as equal and valued
partners in care to achieve the
best health and wellbeing
possible for everyone in Moray
throughout their lives.”
OUR VALUES: Dignity and
respect; person-centred; care
and compassion; safe, effective
and responsive
OUTCOMES: Lives are healthier – People live more independently –
Experiences of services are positive – Quality of life is improved – Health
inequalities are reduced – Carers are supported – People are safe – The
workforce continually improves – Resources are used effectively and
efficiently
Page 46

Page 47

Moray Integration Joint Board Annual Accounts 2021/22 4 
MANAGEMENT COMMENTARY (continued) 
Population 
Moray is a largely rural area covering a land mass of 2,238 sq. km.  It has a long
coastline on the Moray Firth with harbours, fishing villages and world-class
beaches.  The area’s projected population for 2022 is 95,780.  The main centre of
population is Elgin, which is home to more than one quarter of the people living in
Moray.  Other towns of population between 5,000 and 10,000 are Forres, Buckie,
Lossiemouth and Keith.  Moray’s population has grown significantly in recent years
from 87,160 in 1997.  The population growth in Moray is slowing and it is projected
that against the 2018 baseline1 Moray will be one of the 14 councils in Scotland who
will have had a population decline by 2030.  This trend is forecast to continue. 
The table below sets out projected population growth based on the 2018 baseline.
Across Scotland there is a projected reduction in children, limited change in the
working age population, but significant growth in adults of pensionable age. By
comparison it is projected that Moray will have a greater decrease in children, a
marked decrease in those of a working age, but a significantly higher change in those
of a pensionable age. 
1 https://www.nrscotland.gov.uk/files//statistics/nrs-visual/sub-nat-pop-proj-18/pop-proj-principal-2018-
infographic.pdf
Page 47

Page 48

Moray Integration Joint Board Annual Accounts 2021/22 5 
MANAGEMENT COMMENTARY (continued) 
Performance Reporting 
Performance is reported quarterly to the Audit, Performance and Risk Committee of
the MIJB.  In addition to the quarterly reporting, there is a requirement under the Public
Sector (Joint Working) (Scotland) Act 2014 for the MIJB to produce and publish an
Annual Performance Report setting out an assessment of performance in planning
and carrying out the delegated functions for which they are responsible.  The Annual
Performance Report is due to be published by 30 November this year and will be
published on the Health & Social Care Moray website.  The Coronavirus Act (Scotland)
has made provision to delay the publication of this document as prior to Covid it was
published by 31 July. 
One of the major aims of integration and a key measurable target for MIJB is to reduce
the number of Moray residents that are ready to be sent home from hospital but have
been delayed in this process.  This is referred to as a ‘delayed discharge’.  Delayed
discharge can occur due to several reasons but quite often involves the onward
provision of social care which can be complex in nature.  The table below notes
performance over a four year period showing the number of delayed discharge bed
days occupied varying significantly and with minimal seasonal pattern up to March
2022. 
There was a significant reduction in delayed discharges in April to June 2020 onwards
as the focus of the COVID-19 response in Moray was assessing and finding suitable
support for those in hospital (specifically those ready for discharge) to allow for the
anticipated influx of COVID-19 patients. 
After a sharp increase in quarter 2 of 2020-21 an immense amount of work was
undertaken across the Moray system to improve the position, however the challenges
in identifying capacity in the community to provide care for those who need it has
proved extremely challenging.  The impact of covid on existing staffing levels
combined with the increasing needs identified in the community and the increase in
elderly and frail people attending hospital and then requiring some form of assistance
has resulted in increased delayed discharges and increased unmet need in the
community. Despite these efforts the number per 1000 population of bed days
occupied by Delayed Discharges was at its highest level for five years in March 2022.  
Improvements throughout the year include twice weekly (moving to daily when
required) operational meetings to scrutinise the Delayed Discharge workflow, looking
specifically at issues and implementing solutions.  A new contract commenced in
November 2021 for Care at Home service provision.  A new model has been
established where there is a primary provider who will work in close partnership with
HSCM provider services. It is intended that this will increase stability in the market for
care at home, enhance partnership working and facilitate our continued development
of the outcome approach to commissioning.    
Page 48

Page 49

Moray Integration Joint Board Annual Accounts 2021/22 6 
MANAGEMENT COMMENTARY (continued) 
Th
The Number of Bed Days Occupied by Delayed Discharges 18+ per 1,000 population
Jun 21 Sept 21 Dec 21 Mar 22
592 784 1,142 1,294
Jun 20 Sept 20 Dec 20 Mar 21
242 803 672 496
Jun 19 Sept 19 Dec 19 Mar 20
768 751 971 1,208
Jun 18 Sept 18 Dec 18 Mar 19
1,008 1,276 1,070 926
Jun 17 Sept 17 Dec 17 Mar 18
1,161 749 823 1,089
e Nu of Bed Days Occupied by Delayed Discharges (inc code 9) 18+ per 1,000 po 
In relation to Emergency occupied bed days, there continues to be a focus on ensuring
people are getting home quickly and can maintain their independence.  This had
resulted in a long-term downward trend in the rate of emergency occupied bed days
for over 65’s per 1,000 population from June 2017 to March 2021. However, the
reduction of 18% in this rate from Mar 20 to Mar 21 was not maintained and levels are
back up to that of March 2021. 
Rate of Emergency Occupied Bed Days for over 65’s per 1000 Population
Jun 21 Sept 21 Dec 21 Mar 22
1,859 1,934 2,045 2,140
Jun 20 Sept 20 Dec 20 Mar 21
2,087 2,040 1,840 1,780
Jun 19 Sept 19 Dec 19 Mar 20
2,117 2,097 2,112 2,173
Jun 18 Sept 18 Dec 18 Mar 19
2,380 2,375 2,344 2,274
Jun 17 Sept 17 Dec 17 Mar 18
2,558 2,531 2,495 2,444 
Covid 19 challenges and successes 
Throughout 2021/22, the IJB continued to deliver services in line with the Integration
Scheme and Strategic Plan, however the planning and delivery of services remained
impacted by the COVID pandemic. Some services remained temporarily paused
whilst others rapidly adapted their delivery method and the majority of the non-
frontline workforce continued to work from home.  
Page 49

Page 50

Moray Integration Joint Board Annual Accounts 2021/22 7 
MANAGEMENT COMMENTARY (continued) 
For much of the year Moray remained in a pandemic response phase, flexing and
stepping up quickly to respond to spikes in COVID infection rates. It was clear it
would not be possible in all cases to restore services to pre-pandemic levels as long
as enhanced public health measures remained in place. It was further evident that
what could be delivered from within existing resources (workforce, infrastructure, and
finance) was diminished. Even at this level, the requirement to operate core services
alongside the additional measures in place to support the pandemic response meant
there was an immediate and ongoing resource impact
The health and social care system was challenged by some significant periods of
demand. A pan-Grampian approach was taken in how surge and flow through the
system was managed to ensure people in the community and in hospital received
the care they required.
Those working in health and social care in Moray across all sectors, including
independent providers and the third sector stepped up to the challenge on a daily
basis but have felt the negative effects of
the pandemic on our communities more
keenly than others. They have continued to
respond with compassion, empathy and
dedication in protecting and promoting
people’s opportunities to have the best
possible lives. 
By November, Grampian had experienced
three waves of raised levels of COVID-19
infection and was currently in a fourth cycle
of elevated disease which left the entire
health and care system struggling to meet
the normal level of performance despite the
incredible efforts of a reduced and exhausted workforce.
The social care sector in Moray faced continued periods of extreme pressure that
had an impact on the wider community and the effectiveness and efficiency of health
services. Service managers implemented business continuity arrangements to
ensure available staff resources were focussed on maintaining business critical
functions, particularly in care at home, to try to ensure that all essential care was
covered.  
Page 50

Page 51

Moray Integration Joint Board Annual Accounts 2021/22 8 
MANAGEMENT COMMENTARY (continued) 
One of our key challenges was effective communication and engagement with all of
our stakeholders (public, staff and partner organisations). Weekly updates were
produced and widely circulated. The reach of our social media platforms has
expanded and the website continued to be utilised to promote information about the
work of the IJB.
Much of the focus of the last 12 months has been to consolidate learning and
positive developments arising out of the pandemic. This included collaboration
across the sector to mitigate negative impacts on the lives of individuals, families,
communities and colleagues who worked tirelessly to support people, their unpaid
carers and each other.
Vaccination Programme 
Take-up of the COVID-19
vaccine was high among all
cohorts in Moray. In April
2021, Phase 2 of the
COVID-19 vaccination
programme for the over 18s
progressed. The offer of vaccinations progressed by age, starting with those aged
40-49. In August, 16 and 17 year olds were invited to come forward for vaccination
and in September the offer was extended to children and young people aged 12-15.
In February 2022 it was confirmed children aged five to 11 would be offered a
COVID vaccine on the recommendation of the Joint Committee on Vaccination and
Immunisation (JCVI). 
Thanks to the efforts of vaccinators and frontline staff, the Scottish Government met
its target of offering every eligible adult over 18 an appointment by 30 December.
Nearly 77% of eligible adults in Scotland
had received a booster or third dose by
that date.
The Covid vaccination programme was
primarily delivered at the Fiona Alcock
Vaccination Centre in Elgin through
appointments and walk-in opportunities,
with pop-up outreach clinics held in
workplaces and community venues as well as the Mobile Information Bus, to
increase vaccine uptake among the vaccine hesitant in all cohorts. 
Page 51

Page 52

Moray Integration Joint Board Annual Accounts 2021/22 9 
MANAGEMENT COMMENTARY (continued) 
Longer Term Impact of Covid-19 and Wellbeing 
There was real concern that after such a sustained period of intense physically and
emotionally draining work, staff’s own resilience had been badly hit, with the
recognition that they would need support and opportunities to decompress, reflect
and recharge in order to find the reserves required to continue to respond to ongoing
and future challenges. 
The We Care staff health and wellbeing programme was established to deliver, co-
ordinate and enhance staff wellbeing across NHS Grampian and the Health and
Social Care Partnerships. The website acted as a hub where people could access
information, help and advice related to their own
and or their team’s physical and mental wellbeing.
Recovery and Re-mobilisation
Resource was directed into supporting people to
look after themselves by encouraging good
infection control, testing and vaccination, and to
protecting the most vulnerable, including
vulnerable care home residents. Waiting times for
care and support grew longer due to sustained
service pressures. 
Additional work was directed towards increasing capacity and planning ahead for
winter. Operation Iris was enacted at a Grampian wide level for an initial six month
period to manage the health and care system through winter, with the NHS
continuing to operate on an emergency footing. 
The interdependencies between services formed part of the assessment on how we
remobilised, as no part of the system operates in isolation. While demand on the
health and care system continued to be immense, we remained focused on planning
for the longer term to ensure that services remained responsive to the community.
Work on developing some areas of strategic and locality planning slowed as
operational issues continued to be prioritised, but we also saw the acceleration of
transformational redesign around the Home First programme alongside the
opportunities presented by an expanded portfolio of health and care that now
encompasses Dr Gray’s Hospital. 
Changes to Business as Usual Activities/ Transformation
Care home and care at home assurance groups continued to meet to provide
oversight and support to internal and external social care providers within the context
of Covid in Moray. The group monitored information with an overview of cases
staffing, safety, PPE, testing and any other pertinent issues. This is a multi-agency
group that has supported and guided care homes and care at home in a positive way
through the ongoing challenges.
Page 52

Page 53

Moray Integration Joint Board Annual Accounts 2021/22 10 
MANAGEMENT COMMENTARY (continued) 
A new model of care at home has been implemented since October 2021. Health &
Social Care Moray commissioned a single care at home external partner to jointly
deliver an outcome based care at home service across Moray.
Since its establishment, Health & Social Care Moray has liaised and worked closely
with both NHS Grampian and Moray Council, along with other resilience partners, to
ensure that the duties of Category 1 responders are adhered to. Following an
amendment to legislation, IJBs are now included within the within the Civil
Contingencies Act 2004 as Category 1 responders.
Longer Term Changes to Strategies and Plans
Strategic planning has been delayed due to
operation matters in response to the pandemic
taking priority. The Strategic Planning and
Commissioning Group (SPCG) was re-established
in September 2021 and began to oversee the
development of key programmes of work across
the interfaces between primary, secondary and
social care, developing the locality planning
approach and coordination of the many enabling
elements upon which planning and delivery of
services is reliant. 
Locality planning resumed with intelligence gathering to inform locality profiles.
Locality managers agreed terms of reference for
the locality steering groups which will involve
stakeholders developing approaches to
community engagement to identify local health
and wellbeing priorities for improvement.
Locality engagement work commenced in the
Lossiemouth area to consider future health and
wellbeing provision and the impact on patients of
the continued closure of the GP branch surgery
buildings in Hopeman and Burghead.
The strategic plan Moray Partners in Care was
published in 2019 and it is recognised that the health and social care landscape has
changed considerably since then. A refresh of the plan is essential to set the
approach for the next 10 years. The revised plan – to be published in 2022 - will set
out clearly our aims and objectives to the public and our workforce, building on what
has already been achieved.
Page 53

Page 54

Moray Integration Joint Board Annual Accounts 2021/22 11 
MANAGEMENT COMMENTARY (continued) 
Other Impacts on services
In November 2021, Moray was hit by Storm Arwen at one of the coldest periods of
the year. All partners deployed an emergency response to power outages, road
closures, water supply issues and the risk of flooding. Health & Social Care Moray
and the local authority took action to ensure vulnerable residents were safe in their
homes and access to hot food or had alternative accommodation. Throughout the
stormy weather and despite access issues, staff worked diligently to ensure critical
services were maintained.
The Future
Moray continued to progress the Home First approach to supporting people to avoid
unnecessary hospital admission and to return home, wherever possible, without
delay. This work has developed into Hospital without Walls, an ambitious model
involving all aspects of Home First alongside unscheduled care, primary/secondary
care and acute services. 
Hospital without Walls will offer hospital-level care to patients who are acutely unwell
in their own home. It will establish a suite of responsive, co-ordinated, multi-
disciplinary care supporting older people with frailty and multi-morbidity. Initial effort
has been concentrated on developing a Home First Frailty Team who will be
primarily focused at the ‘front door’ of Dr Gray’s Hospital but will also offer support
within the community. 
The multi-disciplinary team will provide rapid geriatric assessments and allow a quick
turnaround of those presenting at the front door. This will combine elements of the
Discharge to Assess service which is
now embedded into the system and
provides an intermediate support
approach for hospital in-patients who
are medically stable and do not
require acute hospital care but may
still require rehabilitation. They are
discharged home with short-term
support to be fully assessed for
longer-term needs in their own home. 
The IJB responded to the Scottish Government’s consultation on a National Care
Service for Scotland following the recommendation of the Independent Review of
adult social care. The National Care Service would operate as a new body to
oversee social care, similar to how the National Health Service oversees health,
enabling social care to have a more equal footing with health care. 
Page 54

Page 55

Moray Integration Joint Board Annual Accounts 2021/22 12 
MANAGEMENT COMMENTARY (continued) 
It proposes that Local Integration Authorities would have more powers and would be
directly funded by national government, rather than receiving their funding from local
authorities and Health Boards as they do at the moment.
Officers continued to work on developing the business case for the delegation of
Moray Children’s Social Work and Criminal Justice to the IJB. Moray Council and
NHS Grampian have now agreed the delegation, the next step to update the
Integration Scheme and get approval from the Scottish Government. 
Financial Review and Performance 
Financial performance forms part of the regular reporting cycle to the MIJB. 
Throughout the year the Board, through the reports it receives is asked to consider the
financial position at a given point and any management action deemed as necessary
to ensure delivery of services within the designated financial framework.  From the
mid-point in the financial year, the Board was presented with financial information that
included a forecast position to the end of the year. In November 2021 the Board
received a financial report which forecast an expected overspend to the end of the
financial year of £2.3m.  This forecast reduced throughout the remainder of the year
and in December 2021, MIJB were forecasting a small underspend to the end of the
year of £0.2m. In March 2021, the MIJB agreed a savings plan of £0.407m.  At the
end of the financial year, only £0.11m had not been achieved.  Scottish Government
additional funding was made available that covered the underachievement on the
savings target and £0.11m was received as part of Covid funding. 
Given the uncertainties associated with Covid-19, it was necessary to update the
Board regularly on the emerging financial position.  This was done formally through
MIJB meetings and informally through development sessions. 
To support the response to Covid-19, the Scottish Government developed a process
to assess the impact of Covid on Integration Authorities’ budgets.  They did this
through the development of local mobilisation plans for each health board area, which
in turn captured each Integration Authority.  The objective was to demonstrate the
impact on IJB budgets and provide appropriate financial support.  The local
mobilisation plans were updated regularly throughout the year and funding allocations
were made by the Scottish Government on the basis of these updates.  At the end of
the financial year, the cost of the mobilisation plan for Moray was £5.2m, this included
£0.11m for the underachievement of the approved savings plan. The largest element
of spend was £3.18m which was used to support sustainability payments to external
providers of care.  Any unspent funds are held in an earmarked reserve and drawn
down as appropriate for the continued support to the pandemic response and
recovery.   
Page 55

Page 56

Moray Integration Joint Board Annual Accounts 2021/22 13 
MANAGEMENT COMMENTARY (continued) 
Additional detail on the areas of spend supported through Covid-19 funding is
highlighted in the table below: 
Description Spend to 31 March 2022 
£000’s
Additional Staffing Costs 160
Provider Sustainability Payments 3,176
Remobilisation 1,178
Cleaning, materials & PPE 90
Elgin Community Hub  556
Prescribing 154
Other (244)
Additional Capacity in Community 17
Underachievement of Savings 110
Total 5,197   
Page 56

Page 57

Moray Integration Joint Board Annual Accounts 2021/22 14 
MANAGEMENT COMMENTARY (continued) 
Service Area Budget
£000’s
Actual
£000’s
Variance
(Over)/ under
spend
Note
Community Hospitals 5,494 5,477 17 
Community Health104,360 5,490 4,932 558 4
Learning Disabilities 8,264 9,691 (1,427) 2
Mental Health 9,267 9,542 (275) 
Addictions 1,282 1,259 23 
Adult Protection & Health Improvement 151 158 (7) 
Care Services Provided In-House 17,215 16,238 977 3
Older People Services & Physical &
Sensory Disability 19,014 20,536 (1,522) 1
Intermediate Care & OT 1,524 1,828 (304) 5
Care Services Provided by External
Contractors 8,540 8,271 269 
Other Community Services 8,576 8,460 116 
Administration & Management 2,400 2,404 (4) 
Other Operational Services 1,176 1,192 (16) 
Primary Care Prescribing 17,416 18,310 (894) 6
Primary Care Services 18,278 18,307 (29) 
Hosted Services 4,619 4,632 (13) 
Out of Area Placements 669 832 (163) 
Improvement Grants 940 758 182 
Total Core Services 130,315 132,827 (2,512) 
Strategic Funds & Other Resources 27,470 7,937 19,533 
TOTALS (before set aside) 157,785 140,764 17,021 
Page 57

Page 58

Moray Integration Joint Board Annual Accounts 2021/22 15 
MANAGEMENT COMMENTARY (continued) 
The table above summarises the financial performance of the MIJB by comparing
budget against actual performance for the year. 
MIJB’s financial performance is presented in the comprehensive income and
expenditure statement (CIES), which can be seen on page 46.  At 31 March 2022
there were usable reserves of £17.02m available to the MIJB, compared to £6.34m at
31 March 2021.  These remaining reserves of £17.02m are for various purposes as
described below: 
Earmarked Reserves Amount
£000’s
Action 15 72
Primary Care Improvement Plan 2,259
Covid-19 9,016
GP Premises 232
Moray care home infection control 223
Community Living Change Fund 319
National Drugs MAT 103
National Drugs Mission Moray 207
OOH Winter Pressure funding 202
Moray Cervical screening 110
Moray hospital at home 199
Moray interface discharge 205
Moray School nurse 46
Moray Psychological 492
MHO Funding 51
Care at Home Investment funding 656
Interim Care Funding 695
Moray Workforce well being 54
Moray Winter Fund HCSW 256
Moray Winter Fund MDT 367
Total Earmarked 15,764  
General Reserves 1,257  
TOTAL Earmarked & General  17,021
Page 58

Page 59

Moray Integration Joint Board Annual Accounts 2021/22 16 
MANAGEMENT COMMENTARY (continued) 
Action 15 – as part of the Mental Health Strategy 2017-2027, Scottish Government
Ministers made a commitment to provide funding to support employment of 800
additional mental health workers to improve access. 
Primary Care Improvement Plan – Scottish Government investment to support the GP
contract that was agreed in 2018.  Covers 6 priority areas identified by Government. 
Covid 19 - additional funding provided by Scottish Government to address the impacts
of the pandemic. 
GP Premises – balance of funding for improvement grants including the making of
premises improvement grants to GP contractors. The continued digitalisation of paper
GP records. Modifications for the purposes of improving ventilation and increase to
the space available in NHS owned or leased premises for primary care multi-
disciplinary teams. 
Community Living Change Fund – funding to be used over a three year period (2021-
2024) to support reducing delayed discharge of those with complex needs, repatriate
people inappropriately placed outside Scotland and to redesign the way service are
provided for people with complex needs. 
Care Home Infection Control – to support Care Homes through the pandemic. 
National Drugs Medication Assisted Treatment (MAT) for embedding and
implementation of the standards will he be overseen by the MAT implementation
support team (MIST). 
National Drugs Mission Moray – balance of funding for range of activities including:
drug deaths, taskforce funding, priorities of national mission, residential rehabilitation,
whole family approach, outreach, bear fatal overdose pathways and lived and living
experience. 
Out of Hours Winter Pressure funding – balance of funding to sustain GO out of hours
and to support resilience to explore operational solutions. 
Moray Cervical Screening – balance of funding for smear test catch up campaign. 
Moray Hospital at home – development of Hospital at Home provides Acute hospital
level care delivered by healthcare professionals, in a home context for a condition that
would otherwise require acute hospital inpatient care. 
Moray Interface Care & Discharge without Delay (DWD)- interface care programme is
part of the urgent and unschedules care programme. DWD programme is to prevent
delay and reduce length of stay. 
Moray School Nurse – balance of school nursing programme for additional school
nurses. 
Page 59

Page 60

Moray Integration Joint Board Annual Accounts 2021/22 17 
MANAGEMENT COMMENTARY (continued) 
Moray Psychological – funding streams for mental health, psychological wellbeing,
facilities, post diagnostic support and psychological therapies. 
Mental Health Officer (MHO) funding – funding to support additional mental health
officer capacity. 
Care at Home investment funding – balance of funding to build capacity in care at
home community based services. 
Interim Care funding – balance of non-recurring funding basis to enable patients
currently in hospital to move into care homes and other community settings. 
Moray Workforce Wellbeing – funding to the health and wellbeing of those working in
health and social care. 
Moray Winter Fund Health Care Social Workers (HCSW) – additional funding for
further HCSW in both the IJB and Emergency department. 
Moray Winter fund Multi Disciplinary Team – additional funding for service pressures
includes Discharge to Assess, Home First Frailty team and volunteer development.  
All reserves are expected to be utilised for their intended purpose during 2022/23. 
Significant variances against the budget were notably: 
Note 1 Older People Services and Physical & Sensory Disability - This budget
was overspent by £1.5m at the end of the year. The final position includes an
overspend for domiciliary care in the area teams, which incorporates the Hanover
complexes for very sheltered housing in Forres and Elgin and for permanent care due
to more clients receiving nursing care than residential care. The ageing population
requiring more complex care and local demographics also contributes to this
overspend. 
Note 2 Learning Disabilities – The Learning Disability (LD) service was overspent
by £1.4m at the end of 2021-22. This consists of a £1.5m overspend, primarily relating
to day services and the purchase of care for people with complex needs.  Adults with
learning disabilities are some of the most vulnerable people in our community and
need a high level of support to live full and active lives.  The overspend was offset in
part by an underspend of £0.1m, relating primarily to staffing in speech and language
and psychology services.  The transformational change programme in learning
disabilities helps to ensure that every opportunity for progressing people’s potential for
independence is taken, and every support plan involves intense scrutiny which in turn
ensures expenditure is appropriate to meeting individual outcomes. 
Page 60

Page 61

Moray Integration Joint Board Annual Accounts 2021/22 18 
MANAGEMENT COMMENTARY (continued) 
Note 3 Care Services Provided In-House – This budget was underspent by £1.0M
at the end of the year. The most significant variances relate to the Care at Home
services for all client groups and the Supported Living services which are underspent
predominantly due to vacancies and issues with recruitment and retention. 
Overspends in internal day services £0.1m mainly due to transport costs and less
income received than expected. 
Note 4 Community Health – This budget was underspent overall by £0.6m at the end
of 2021-22 and is primarily due to vacancies, unplanned leave and retirements.
Recruitment and retention is an issue, which is not just apparent in Moray and a plan
is currently in place to deal with this going forward. 
Note 5 Intermediate Care & Occupational Therapy (OT) – This budget was
overspent by £0.3m. This relates primarily to OT equipment where costs have
increased due to manufacturing and supply to Moray and more complex equipment
requests. 
Note 6 Primary Care Prescribing - This budget was overspent by £894,000. The
budget to March includes includes an uplift of £706,000 (non-recurring) for efficiencies
not achieved and £115,000 recurring from within Moray IJB. Medicines management
practices continue to be applied on an ongoing basis to mitigate the impact of external
factors as far as possible and to improve efficiency of prescribing both from clinical
and financial perspectives 
Set Aside – Excluded from the financial performance table above on page 14 but
included within the Comprehensive Income & Expenditure Account is £13.04m for Set
Aside services.  Set Aside is an amount representing resource consumption for large
hospital services that are managed on a day to day basis by the NHS Grampian.  MIJB
has a responsibility for the strategic planning of these services in partnership with the
Acute Sector.
Set Aside services include:
• Accident and emergency services at Aberdeen Royal Infirmary and Dr Gray’s
inpatient and outpatient departments;
• Inpatient hospital services relating to general medicine, geriatric medicine,
rehabilitation medicine, respiratory medicine, learning disabilities, old age
psychiatry and general psychiatry; and
• Palliative care services provided at Roxburgh House Aberdeen and The Oaks
Elgin.
The budget allocated to Moray is designed to represent the consumption of these
services by the Moray population. As a result of prioritising resources to support the
Covid pandemic Public Health Scotland have not produced activity data for Set Aside
services for the 2019/20 or 2020/21 financial years.    
Page 61

Page 62

Moray Integration Joint Board Annual Accounts 2021/22 19 
MANAGEMENT COMMENTARY (continued) 
The figures for 2021/22 have been derived by uplifting 2019/20 figures by baseline
funding uplift in 2020/21 (3.00%) and 2021/22 (3.36%): 
2021/22 2020/21 2019/20 2018/19
Budget 13.04m 12.62m 12.252m 11.765m
Number of Bed
Days and A&E
Attendances -------- ------- ------- 47,047 
Risks, Uncertainties and Future Developments
The MIJB Chief Officer has a responsibility to maintain a risk strategy and risk reporting
framework.  Risks inherent within the MIJB are monitored, managed and reported at
each meeting of the Audit, Performance and Risk Committee.  In addition, a risk action
log is monitored and managed by the Senior Management Team.   
The key strategic risks of the MIJB classed as ‘High’ and ‘Very High’ are presented
below: 
VERY HIGH
Risk 2 - There is a risk of MIJB financial failure in that the demand for services
outstrips available financial resources.  Financial pressures being experienced both
by the funding Partners and Community Planning Partners will directly impact on
decision making and prioritisation of MIJB. 
Mitigating Actions - Risk remains of the challenge that the MIJB can deliver
transformation and efficiencies at the pace required.  Financial information is
reported regularly to both the MIJB, Senior Management Team and System
Leadership Group. 
The Chief Officer and Interim Chief Financial Officer (CFO) continue to engage in
finance discussions with key personnel of both NHS Grampian and Moray Council. 
These conversations have continued throughout the Covid-19 pandemic. 
The Chief Officer and CFO will continue to engage with the partner organisations in
respect of the financial position throughout the year. Cross partnership performance
meetings are in place with partner CEOs, Finance Directors and the Chair/Vice
Chair of the MIJB. 
The CFO and Senior Management Team have worked together to address further
savings which will be presented to the Board for approval as part of the budget
setting procedures for 2022/23.  This should be a focus of continuous review to
ensure any investment is made taking cognisance of existing budget pressures. 
Page 62

Page 63

Moray Integration Joint Board Annual Accounts 2021/22 20 
MANAGEMENT COMMENTARY (continued) 
HIGH
Risk 1 - The Integration Joint Board (IJB) does not function as set out within the
Integration Scheme, Strategic Plan and
Scheme of Administration and fails to deliver its objectives or expected outcomes.
Inability to recruit and retain qualified and experience staff to provide and maintain
sustainable, safe care. 
Mitigating Actions -  Induction sessions are held for new IJB members and IJB
members briefings are held regularly. Conduct and Standards training was held for
IJB members in December 2020 with update provided by Legal Services as
appropriate. 
Senior Management Team (SMT) regular meetings and directing managers and
teams to focus on priorities. 
Regular development sessions are held with IJB and System Leadership Group
(SLG) 
Strategic Plan and locality management structure is in place The work that has been
progressed through the Covid19 response has escalated developments in some
areas as a matter of priority. This has been achieved through collaborative working
with partner organisations and the third sector 
Risk 3 - Inability to recruit and retain qualified and experience staff to provide and
maintain sustainable, safe care. 
Mitigating Actions - System re-design and transformation.   
Organisational Development Plan and Workforce plan were updated and approved
by MIJB in November 2019 and they are being progressed by the Workforce Forum.
Workforce planning has recommenced alongside plans for NShG and Moray
Council and an initial draft will be submitted to Senior Management Team 8 June
2022.   
Staff Wellbeing is a key focus and there are many initiatives being made available
to all staff including training, support, information and access to activities. 
Locality Managers are developing the Multi-disciplinary teams in their areas and
some project officer support has been provided to develop the locality planning
model across Moray. 
Lead Managers are involved in regional and national initiatives to ensure all learning
is adopted to improve this position.  They are also linked to University Planning for
intakes and programmes for future workforce development 
Page 63

Page 64

Moray Integration Joint Board Annual Accounts 2021/22 21 
MANAGEMENT COMMENTARY (continued) 
HIGH (continued)
Risk  5 - Inability to cope with unforeseen external emergencies or incidents as a
result of inadequate emergency and resilience planning. 
Mitigating Actions – Information from the updated Business Impact Assessments
/Business Continuity Plans has informed elements of the Winter Preparedness Plan
(Surge plan). 
A Friday huddle is in place which gathers the status of services across the whole
system to provide information and contact details to the Senior Manager on Call
(SMOC) over the weekend. 
NHS Grampian have introduced system wide daily huddles to manage the flow and
allocation of resources which require attendance from Dr Grays and HSCM. 
NHS Grampian have amended their approach to Pandemic preparation so HSCM
Pandemic plan requires redrafting and testing. 
Practitioner group established for Moray with representation from HSCM, Dr Grays,
Moray Council and NHS Grampian to discuss matters arising from the Local
Resilience Forum and within our respective organisations.  In addition it will provide
a forum for discussion of the linkages between organisational response plans to
ensure there are no gaps or over reliance on particular local resources. 
HSCM represented at Grampian Local Resilience Partnership meetings and
working groups and at NHSG Civil Contingencies group to ensure that plans are
aligned and networks are established and maintained for use to support a response. 
Risk 7 - Inability to achieve progress in relation to national Health and Wellbeing
Outcomes.  
Performance of services falls below acceptable level. 
Mitigating Actions – Service managers monitor performance regularly within their
teams and escalate any issues to the System Leadership Group (SLG) for further
discussion to provide wider support, developing shared ownership and a greater
understanding across the whole system. 
Key operational performance data is being circulated daily to all managers in the
Daily dashboard to ensure any potential issues are identified quickly so action can
be taken.  This dashboard is being reviewed and will be further developed with the
intention of further dashboards to provide a whole system overview.  This has been
discussed at SLG and agreed. 
Performance information is presented to the Performance sub group of Practice
Governance Group to inform Social Care managers of the trends in service
demands so that resources can be allocated appropriately. 
Page 64

Page 65

Moray Integration Joint Board Annual Accounts 2021/22 22 
MANAGEMENT COMMENTARY (continued) 
HIGH (continued)
Risk 8 - Inability to progress with delivery of Strategic Objectives and
Transformation projects. 
Mitigating Actions - Integrated Infrastructure Group previously established, with
ICT representation from NHS Grampian and Moray Council, to consider and provide
solutions to data sharing issues and ICT infrastructure matters.  Linkages to
Infrastructure Board and information sharing groups had been established albeit
these meetings are not taking place regularly at the moment. 
Data sharing groups for Grampian and Health and Social Care Moray were 
established and meetings were held regularly but have not taken place regularly
during Covid.  These meetings have oversight of any issues arising from Data
protection and GDPR matters from either Council or NHS systems.  During covid
the issues have been dealt with as they arose 
Risk 9 - Requirements for support services are not prioritised by NHS Grampian
and Moray Council. 
Mitigating Actions – Membership of the Board was reviewed and revised to ensure
representation of all existing infrastructure processes and funding opportunities. 
Process for ensuring infrastructure change/investment requests developed.
Infrastructure Manager in post and linking into other Infrastructure groups within
NHS Grampian and Moray Council to ensure level of ‘gatekeeping’.
Dr Gray’s site development plan is being produced collaboratively with input from
NHS Grampian and HSCM management.
Work is progressing on identification of needs for some services with regard to
accommodation which will be communicated with partners to find the most effective
solution 
Development Aims for 2022/23 
HOME FIRST 
The planning and delivery to meet the threat of Covid-19 has led to some rapid change
and has created a new starting point. Home First continues to be the key strategic
theme/over-arching project to embed change going forwards, to ensure that in a new
environment we can continue to meet health and care needs safely, and can react to
further waves of Covid-19; winter pressures; and future unknown events. Developing
from last year’s Operation Home First, Moray has continued to mature it’s Home First
work streams whilst also ensuring they are targeted and coordinated. In an effort to
explore the entire patient pathway Hospital without Walls was devised.  This
programme will ensure there is a suite of responsive, seamless, coordinated, multi-
disciplinary care supporting older people with frailty and multi-morbidity. Hospital
without Walls pulls together the individual work streams under.  
Page 65

Page 66

Moray Integration Joint Board Annual Accounts 2021/22 23 
MANAGEMENT COMMENTARY (continued) 
Home First whilst also considering unscheduled care, primary and secondary care
services 
As a result of the Covid 19 activity and diversion, the Strategic Plan 2019-29, the
Medium Term Financial Strategy and other supporting plans are due to revisited in
22/23. 
As the organisation continues to remobilise following the impacts of response, new,
transformational ways of working are being adopted and are informing our approach
to delivery of the strategic objectives outlined in the plan. 
In addition we will seek to: 
• Continue to develop systems leadership with a Portfolio approach;
• Further embed Home First and develop Hospital without walls;
• Ensure successful embedding of Discharge to Assess and how it interfaces
with other services in support of reducing Delayed Discharges;
• Continually develop by progressing the MIJB Improvement Action Plan
measured against the Ministerial Strategic Objectives;
• Ensure compliance with the Governance Framework as approved by the
MIJB in January 2021;
• Progress the Primary Care Improvement Plan; and
• Embed recommendations from the Independent Review of Adult Social
Care, and continue to embed Self Directed Support into mainstream
activities.
• Progress Housing development for people with a Learning Disability. 
…………………………  ……………………… ……………………… 
Dennis Robertson    Simon Bokor-Ingram Deborah O’Shea 
Chair of Moray IJB   Chief Officer  Interim Chief 
Financial Officer 
Page 66

Page 67

Moray Integration Joint Board Annual Accounts 2021/22 24 
STATEMENT OF RESPONSIBILITIES 
Responsibilities of the MIJB 
• To make arrangements for the proper administration of its financial affairs and
to secure that it has an officer responsible for the administration of those affairs. 
In Moray Integration Joint Board, that officer is the Interim Chief Financial
Officer; 
• To manage its affairs to achieve best value in the use of its resources and
safeguard its assets; 
• Ensure the Annual Accounts are prepared in accordance with legislation (The
Local Authority Accounts (Scotland) Regulations 2014) and the Local Authority
(Capital Financing and Accounting) (Scotland) (Coronavirus) Amendment
Regulations 2022, and so far as is compatible with that legislation, in
accordance with proper accounting practices (section 12 of the Local
Government in Scotland Act 2003); and 
• To approve the Annual Accounts. 
I confirm that the Annual Accounts were approved by the MIJB at its meeting on 26
January 2023. 
Signed on behalf of the Moray Integration Joint Board 
Dennis Robertson
Chair of Moray IJB 
Page 67

Page 68

Moray Integration Joint Board Annual Accounts 2021/22 25 
STATEMENT OF RESPONSIBILITIES (continued)
Responsibilities of the Interim Chief Financial Officer 
The Interim Chief Financial Officer is responsible for the preparation of the Moray
Integration Joint Board’s Annual Accounts in accordance with proper practices as
required by legislation and as set out in the CIPFA/LASAAC Code of Practice on Local
Authority Accounting in the United Kingdom (the Code). 
In preparing the Annual Accounts the Interim Chief Financial Officer has: 
• Selected suitable accounting policies and applied them consistently; 
• Made judgements and estimates that were reasonable and prudent; 
• Complied with legislation; and 
• Complied with the local authority code (in so far as it is compatible with
legislation). 
The Interim Chief Financial Officer has also: 
• Kept proper accounting records which were up to date; and 
• Taken reasonable steps for the prevention and detection of fraud and other
irregularities. 
I certify that the financial statements give a true and fair view of the financial position
of the Moray Integration Joint Board as at 31 March 2022 and the transactions for the
year then ended 
Deborah O’Shea FCCA
Interim Chief Financial Officer 
Page 68

Page 69

Moray Integration Joint Board Annual Accounts 2021/22 26 
REMUNERATION REPORT 
Introduction
This Remuneration Report is provided in accordance with the Local Authority Accounts
(Scotland) Regulations 2014 (SSI2014/200) as part of the MIJB annual accounts.  This
report discloses information relating to the remuneration and pension benefits of
specified MIJB members. 
All information disclosed in the tables is subject to external audit.  Other sections within
the Remuneration Report will be reviewed for consistency with the financial
statements. 
Moray Integration Joint Board
The voting members of MIJB are appointed through nomination by Moray Council and
the Grampian Health Board.  There is provision within the Order to identify a suitably
experienced proxy or deputy member for both the voting and non-voting membership
to ensure that business is not disrupted by lack of attendance by any individual. 
MIJB Chair and Vice-Chair
Nomination of the MIJB Chair and Vice-Chair post holders alternates every 18 months
between a Councillor and a Health Board non-executive member. 
The MIJB does not provide any additional remuneration to the Chair, Vice-Chair or
any other board members relating to their role on the MIJB.  The MIJB does not
reimburse the relevant partner organisations for any voting member costs borne by
the partner. 
The MIJB does not have responsibilities in either the current or in future years for
funding any pension entitlements of voting MIJB members.  Therefore no pension
rights disclosures are provided for the Chair or Vice-Chair. 
Taxable
Expenses
2020/21
Name Position Held Nomination
By
Taxable
Expenses
2021/22
£    £
- Dennis
Robertson
Vice-Chair
29/04/21 to date
Chair 
24/09/20 to 29/04/21
Grampian
Health Board -
- Cllr Shona
Morrison
Chair
29/04/21 to
31/03/2022
Vice-Chair
01/10/19 to
29/04/2021 
Moray
Council  -
Page 69

Page 70

Moray Integration Joint Board Annual Accounts 2021/22 27 
REMUNERATION REPORT (continued) 
Officers of the MIJB
The MIJB does not directly employ any staff in its own right; however specific post-
holding officers are non-voting members of the Board. 
Chief Officer
Under section 10 of the Public Bodies (Joint Working) (Scotland) Act 2014 a Chief
Officer for the integration joint board has to be appointed and the employing partner
has to formally second the officer to the Board.  The employment contract for the Chief
Officer will adhere to the legislative and regulatory framework of the employing partner
organisation.  The remuneration terms of the Chief Officer‘s employment are approved
by the Board. 
Other Officers
No other staff are appointed by the MIJB under a similar legal regime.  Other non-
voting board members who meet the criteria for disclosure are included in the
disclosures below. 
Total
2020/21 Senior Employees Salary, Fees &
Allowances Total 2021/22
£  £ £
96,115 Simon Bokor-Ingram
Chief Officer  109,826 109,826
87,271 Tracey Abdy
Chief Financial Officer 93,904 93,904 
In respect of officers’ pension benefits, the statutory liability for any future contributions
to be made rests with the relevant employing partner organisation.  On this basis there
is no pensions liability reflected on the MIJB balance sheet for the Chief Officer or any
other officers. 
The MIJB however has a responsibility for funding the employer contributions for the
current year in respect of the officer time spent on fulfilling the responsibilities of their
role on the MIJB.  The following table shows the MIJB’s funding during the year to
support the officers’ pension benefits.  The table also shows the total value of accrued
pension benefits which may include benefits earned in other employment positions
and from each officer’s own contributions. 
NOTE: no bonuses, expenses allowances, compensation for loss of office or
any taxable benefits were made in 2021/22
Page 70

Page 71

Moray Integration Joint Board Annual Accounts 2021/22 28 
REMUNERATION REPORT (continued) 
In Year Pension
Contributions Accrued Pension Benefits  
Year to
31/03/21 
Year to
31/03/22 
As at
31/03/2022 
Difference
from
31/03/2021 
£ £  £ 000’s £ 000’s 
Simon Bokor-
Ingram, Chief
Officer 
13,142
(from
20/4/20)
22,954 
Pension  43 5
Lump Sum 87 7 
Tracey Abdy
Chief Financial
Officer 
18,075  18,562
Pension 20 2
Lump Sum 18 - 
Disclosure by Pay bands
As required by the regulations, the following table shows the number of persons whose
remuneration for the year was £50,000 or above, in bands of £5,000. 
Number of Employees in
Band 2020/21 Remuneration Band Number of Employees in
Band 2021/22
1 £85,000 - £89,999 -
- £90,000 - £94,999 1
1 £95,000 - £99,999 -
- £105,000 - £109,999 1 
Page 71

Page 72

Moray Integration Joint Board Annual Accounts 2021/22 29 
REMUNERATION REPORT (continued) 
Exit Packages
There were no exit packages agreed by the MIJB during 2021/22 financial year, or in
the preceding year. 
………………………..     ………………………
Dennis Robertson       Simon Bokor-Ingram
Chair of Moray IJB      Chief Officer                                                                                 
Page 72

Page 73

Moray Integration Joint Board Annual Accounts 2021/22 30 
ANNUAL GOVERNANCE STATEMENT 
The Annual Governance Statement describes the Moray Integration Joint Board’s
(MIJB) governance arrangements and reports on the effectiveness of the MIJB’s
system of internal control.   
Scope of Responsibility
The MIJB is responsible for ensuring that its business is conducted in accordance with
the law and appropriate standards, and that public money is safeguarded and used
efficiently and effectively in pursuit of best value. 
In discharging its responsibilities, the MIJB has established arrangements for its
governance which includes the system of internal control.  This system is intended to
manage risk and support the achievement of the MIJB’s policies, aims and objectives. 
The system provides reasonable but not absolute assurance of effectiveness. 
The MIJB places reliance of the systems of internal control of NHS Grampian systems
and Moray Council, which supports organisational compliance of policies and
procedures in addition to those of the MIJB.  Assurances are required on the
effectiveness of the governance arrangements of all three organisations, meaning a
significant failure in one of the three Partners may require to be disclosed in the annual
accounts of all three Partners. 
The Governance Framework 
The CIPFA/SOLACE framework for ‘Delivering Good Governance in Local
Government’ last updated in 2016 remains current and provides a structured approach
in defining seven principles that underpin effective governance arrangements.  Whilst
the framework is written specifically for Local Government, the principles apply equally
to integration authorities, and while the MIJB continues to evolve as an entity in its
own right. It continues to draw on the governance assurances of NHS Grampian and
Moray Council as its principal funding partners.   
Given the scope of responsibility within the MIJB and the complexities surrounding the
assurance arrangements, a Local Code of Corporate Governance was developed and
the MIJB assesses the effectiveness of its governance arrangements against the
principles set out in the document.  The Code outlines the seven governance principles
from the CIPFA/SOLACE guidance (as referenced below) and provides the sources
of assurance for assessing compliance relative to the MIJB, Moray Council and NHS
Grampian.  These assurances include referencing the governance arrangements of
NHS Grampian and Moray Council which are summarised annually and published in
their respective Annual Governance Statements which form part of the annual
accounts of each organisation.  The respective governance statements can be found
on the individual organisations websites: Moray Council: Annual Accounts - Moray
Council and NHS Grampian: https://www.nhsgrampian.org/about-us/annual-
accounts/ 
.
Page 73

Page 74

Moray Integration Joint Board Annual Accounts 2021/22 31 
ANNUAL GOVERNANCE STATEMENT (continued) 
Key Governance Arrangements 
Covid-19 has had a significant impact on the MIJB and its approach to dealing with
the pandemic has involved the use of amended governance arrangements granted
under delegated powers 
All of the scheduled Audit Performance and Risk Committee meetings were held as
timetabled during 2021/22.  An interim arrangement was agreed for the operation of
the Clinical and Care Governance Committee whereby the Chair of the Committee
received monthly updates on the key issues arising during the pandemic response. 
This related principally to the provision of care, care home oversight and child and
adult protection matters.   In addition the Chief Officer committed to providing weekly
updates on the emerging situation to IJB Members, elected Members and staff. 
Health and Social Care Moray (HSCM) established an emergency response group
that has been operational since the end of March 2020, with the frequency of meetings
being adapted throughout the year dependent on the stage of response. 
Representation on the emergency response groups of the Partner organisations is
provided by HSCM staff, ensuring the necessary links and flow of information to
ensure a co-ordinated response on a pan Grampian basis and locally within Moray. 
The collaborative working across the whole system increased with the Omicron wave
of Covid as the impact on staffing levels and demand for services put extreme pressure
on all aspects of service delivery.  Up to three times daily meetings were held 7 days
a week to ensure a co-ordinated response. In addition a Grampian Operation
Performance Escalation System (GOPES) was established to enable senior leaders
to have oversight of where pressures were located in the system and to direct
responses accordingly.  This development has also strengthened the identification of
key metric thresholds to inform the levels for escalation  
Page 74

Page 75

Moray Integration Joint Board Annual Accounts 2021/22 32 
ANNUAL GOVERNANCE STATEMENT (continued) 
Evaluation of the Effectiveness of Governance
Governance Principle 1 – Behaving with integrity, demonstrating strong
commitment to ethical values and respecting the rule of law
Assessment of Effectiveness 
• The activities of the MIJB are directed by a Board comprising voting and non-
voting members. The Board meets every two months and draws its
membership from a broad range of sources. Formal Board meetings are
augmented by regular development sessions that focus in detail on specific
areas. The Board is also supported by an Audit, Performance and Risk
Committee, and a Clinical and Care Governance Committee, each with a
specific remit to support effective governance arrangements. The Scheme of
Integration was reviewed during 2021 to increase by one voting member from
each partner organisation to facilitate increased membership at the
Committees
• The MIJB operates in line with Standing Orders that govern proceedings of
the Board and its Committees, and which incorporates the Board’s Scheme
of Administration that deals with the Board’s committee structure and working
groups.
• The MIJB has appointed a Standards Officer to support compliance with an
ethical standards framework in line with the Ethical Standards in Public Life
etc. (Scotland) Act 2000 whereby members of devolved public bodies such
as the MIJB are required to comply with Codes of Conduct, approved by
Scottish Ministers, together with guidance issued by the Standards
Commission. 
Page 75

Page 76

Moray Integration Joint Board Annual Accounts 2021/22 33 
ANNUAL GOVERNANCE STATEMENT (continued) 
Governance Principle 2 – Ensuring openness and comprehensive stakeholder
engagement 
Assessment of Effectiveness 
• Provision is made within MIJB’s Standing Orders for public and press access
to meetings and reports.  During the 2021/22 year there was a continued
need to  broadcast live Board meetings with attendance being virtual for all. 
A specific web-site has been developed for Health and Social Care Moray
and is continuously monitored for improvement.  Agendas, reports and
minutes for all committees can be accessed via the website in addition to all
the linked strategies of the MIJB.
• Both the voting and non-voting membership arrangements of the MIJB are in
line with the Public Bodies (Joint Working) (Integration Joint Boards)
(Scotland) Order 2014.  The non-voting membership comprises six
professional members and five stakeholder members representing: staff,
third sector bodies carrying out activities in relation to health and social care,
service users and unpaid carers, and four additional non-voting members
which include the Chief Executives of Moray Council and NHS Grampian in
an Ex-officio capacity.  The broad membership of the MIJB ensures valued
input and engagement from a wide range of stakeholders.
• The Community Empowerment (Scotland) Act 2015 places a statutory duty
on MIJB and its Community Planning Partners to engage with communities
on the planning and delivery of services and securing local outcomes.  The
MIJB has an approved Communications and Engagement Strategy which
recognises and promotes the active and meaningful engagement with all
stakeholders.   
Governance Principle 3 – Defining outcomes in terms of sustainable
economic, social and environmental benefits 
Assessment of Effectiveness 
• The MIJB has in place a Strategic Plan 2019-29 which is supported by various
documents including a medium term financial framework.  Following the impact
of the pandemic a review is planned for both documents. 
• The plan is underpinned by a performance framework, workforce plan,
organisational development strategy, and a communications, engagement and
participation plan. Initial work has commenced for an updated workforce plan
due for completion by July 2022
• The suite of documents are designed to identify outcomes and forward-thinking
on direction over the medium term.  Outcomes are closely linked to the delivery
of health and social care and the planned improvements for the population of
Moray. 
• A climate change duties report is collated and submitted annually on behalf of
the MIJB. 
Page 76

Page 77

Moray Integration Joint Board Annual Accounts 2021/22 34 
ANNUAL GOVERNANCE STATEMENT (continued) 
Governance Principle 4 – Determining the interventions necessary to optimise
the achievement of intended outcomes 
Assessment of Effectiveness 
• The MIJB’s decision making process ensures that the members of the Board
receive objective and robust analysis of a variety of options indicating how the
intended outcomes will be achieved, providing information on the associated
risks and opportunities.   
• Board papers reflect the broad range of matters under consideration including
regular update reports by the Chief Officer on topical matters and agenda items
covering opportunities and challenges arising from reconfiguration of services. 
• The Financial Management Code promoted by CIPFA is recognised as a means
of assisting in ensuring good financial administration.  A medium term financial
strategy was approved by the MIJB in March 2022 and will be reviewed in the
new financial year, once the strategic plan has been reviewed. 
Governance Principle 5 – Developing the entity’s capacity, including the
capability of its leadership and the individuals within it
Assessment of Effectiveness 
• The Senior and Operational Management teams were due to continue to take
part in a Systems Leadership Programme led by The Kings Fund to support the
leadership teams however this has been further paused for the Covid 19
response.  During the Covid 19 response there has been increased opportunity
to work collaboratively across organisations through use of new technology. 
• The MIJB has met with Officers regularly for development sessions to increase
the opportunity for shared learning and constructive challenge. 
Page 77

Page 78

Moray Integration Joint Board Annual Accounts 2021/22 35 
ANNUAL GOVERNANCE STATEMENT (continued) 
Governance Principle 6 – Managing risk and performance through robust
internal control and strong public financial management
Assessment of Effectiveness 
• As part of a robust risk monitoring framework, the Strategic Risk Register is
reviewed and updated regularly and presented to every Audit, Performance and
Risk Committee.   A related action log was created for monitoring purposes and
is owned and monitored by the Senior Management Team.
• A Performance Management Framework has been developed.  Performance
reporting falls within the scope of the Audit, Performance and Risk Committee
and reporting is quarterly.
• The internal control system links closely with those of the Partners, given their
operational remit for delivery of services under direction of the MIJB.  The Audit,
Performance and Risk committee through its consideration of reports monitors
the effectiveness of internal control procedures.  The MIJB Chief Internal Auditor
undertakes an annual review of the adequacy of internal controls and the opinion
is included within this statement.
• The MIJB has an independent S95 Officer who is a member of the MIJB,
providing advice on all financial matters and ensure timely production and
reporting of budget estimates, budget monitoring reports and annual accounts.
• Governance arrangements have been developed and maintained to comply with
the core functions of various good framework guidelines including Code of
Practice on Managing the Risk of Fraud and Corruption, Public Sector Internal
Audit Standards (incorporating the principles of the Role of the Head of Internal
Audit), Audit Committees: Practical Guidance for Local Authorities and Police,
etc. 
Governance Principle 7 – Implementing good practices in transparency,
reporting and audit to deliver effective accountability
Assessment of Effectiveness 
• MIJB business is conducted through an approved cycle of Board meetings. 
During the year, recordings of Board meetings were made available to the
public.  Agendas, reports and minutes are available for the public to inspect. 
There is a standard reporting format in place to ensure consistency of approach
and consideration by Members to provide transparency in decision making.
• The MIJB publishes both Annual Accounts and an Annual Performance Report
following Board approval.
• The Chief Internal Auditor reports directly to the Audit, Performance and Risk
committee with the right of access to the Chief Officer, Interim Chief Financial
Officer and Chair of the Audit, Performance and Risk committee on any matter. 
The Chief Internal Auditor has continued to report to Committee during 2021/22. 
Page 78

Page 79

Moray Integration Joint Board Annual Accounts 2021/22 36 
ANNUAL GOVERNANCE STATEMENT (continued) 
Review of Adequacy and Effectiveness
The MIJB has a responsibility for conducting, at least annually, a review of the
effectiveness of the governance arrangements, including the system of internal
control.  The review is informed by the work of the Senior Management Team (which
has responsibility for the development and maintenance of the internal control
framework environment); the work of the Internal Auditors and the Chief Internal
Auditor’s annual report and the reports from the External Auditor and other review
agencies and inspectorates. 
Internal Audit Opinion 
The Internal Audit Service for the MIJB is delivered by Moray Council’s Internal Audit
Section, and the Council’s Audit and Risk Manager holds the Chief Internal Auditor
appointment to the MIJB until the 31st of March 2024. The Council’s Internal Audit
Section has adopted the Public Sector Internal Audit Standards (PSIAS) that requires
the Chief Internal Auditor to deliver an annual internal audit opinion and report, which
has also been used to inform this governance statement.
The Chief Internal Auditor’s evaluation of the adequacy and effectiveness of the MIJB
framework of governance, risk management and internal control includes
consideration of the findings from the audit work undertaken by the Chief Internal
Auditor in his role as the Audit and Risk Manager for the Moray Council. Assurance is
also sought from the Internal Audit Service Provider for NHS Grampian of the
governance processes adopted by that organisation. In addition, reports issued by
other external review agencies are considered in the opinion provided by the Chief
Internal Auditor.   
In accordance with PSIAS, the Chief Internal Auditor prepares a  risk based Audit Plan
for the MIJB, which has regard to the internal audit arrangements of both the Moray
Council and NHS Grampian functions. The impact of the pandemic continued to affect
the Internal Audit Section in that officers have been working from home with a need to
change established working practices and make greater use of audio, video, and
screen sharing software applications. In addition, the Section has also had several staff
vacancies during the year. Despite these constraints, the Audit Plan for 2021/22 was
completed.
The audits reported to the MIJB Audit, Performance and Risk Committee included a
review of the financial monitoring arrangements within the Self Directed Support Team
for direct payments made to service users. The audit found several areas where
improvements were required to current operating systems and procedures, including
a need to review all the care packages of the service user to recover any excess funds.
An audit report was also received into the management arrangements of income held
for individuals under Corporate Appointeeship Arrangements. The review found that
the service was administered well, but findings were noted, including a need to review
cash handling procedures and further management overview of the corporate bank
account reconciliation process.        
Page 79

Page 80

Moray Integration Joint Board Annual Accounts 2021/22 37 
ANNUAL GOVERNANCE STATEMENT (continued)
However, the Chief Internal Auditor has raised concerns regarding a report to the Audit,
Performance and Risk Committee on the 31st of March that detailed the outcome of a
review of the Health and Social Care Moray Commissioning Service into how social
care contracts are currently being managed. This was a “peer” review led by the
Strategic Procurement Manager (Social Care) of Aberdeen City and Aberdeenshire
Councils. The report has highlighted a number of significant concerns about how social
care contracts are managed. The Audit, Performance and Risk Committee have
agreed for an external organisation to undertake a review of the Commissioning
Service. 
The Chief Internal Auditor, after consideration to the results of the work carried out by
Internal Audit, taken together with other sources of assurance, with specific reference
to the peer review into how the Commissioning Service manages social care contracts;
only limited assurance can be provided that the Moray Integration Joint Board has
adequate systems of governance and internal control, for the year ended 31 March
2022. 
Page 80

Page 81

Moray Integration Joint Board Annual Accounts 2021/22 38 
ANNUAL GOVERNANCE STATEMENT (continued) 
Prior Year Governance Issues 
The Annual Governance Statement for 2020/21 highlighted a number of areas for
development in looking to secure continuous improvement.  An assessment of
progress is provided below: 
Area for Improvement Identified in
2020/21 
Action Undertaken / Progress Made in
2021/22
It is recognised that the impact the
pandemic has had on services drives the
need to review the Strategic Plan 2019-
29 during 2021/22.  The review will
require engagement of key stakeholders
and MIJB approval following the
governance framework. 
The Medium Term Financial Framework
will be reviewed to reflect the emerging
and anticipated financial challenge
arising from Covid 19 and Scottish
Government policy changes 
Focus will be placed on the Governance
Framework approved by the Board in
January 2021 to ensure this key
document is embedded into operational
and strategic delivery 
As part of the financial challenge it is
necessary to ensure continuous
dialogue and identification of further
savings opportunities.  This was a
commitment made as part of the revenue
budget setting for 2021/22, recognising
current and future impact and the drive
for transformation through Home First. 
Increase focus on the development of
commissioning capabilities to deliver
best value with a tender exercise for
outcome based care at home services. 
The Strategic plan is being refreshed and
will be presented to the IJB in November
2022. The Moray Portfolio is also
working with NHS Grampian on their
plan for the future, and will be
undertaking a joint planning process in
2022 to define the future for Dr Grays
Hospital. 
The Medium Term Financial Framework
22/23 to 26/27 was presented to the IJB
in March 2022. It will be reviewed once
the Strategic plan has been refreshed. 
The Governance Framework continues
to be embedded. Portfolio arrangements
will mean a refresh is required. 
Transformational redesign has
continued at pace. Levels of demand,
including backlogs post Covid, has
resulted in it being more challenging to
identify cash savings. 
Outcome based commissioning model in
place, with evaluation in 2022/23.
Further development of Self Directed
Support and progressive changes to
practice using the Three Conversation
Model  
Page 81

Page 82

Moray Integration Joint Board Annual Accounts 2021/22 39 
ANNUAL GOVERNANCE STATEMENT (continued) 
Further Developments 
Following consideration of the review of adequacy and effectiveness, the following
action plan has been established to ensure continual improvement of the MIJB’s
governance arrangements and progress against the implementation of these issues
will be assessed as part of the next annual review. 
Areas of focus for 2022/23
1. Extending the Hospital Without Walls model to move care closer to home, with
a shift to earlier intervention that reduces the demands on acute hospital care. 
2. Developing the Portfolio approach for the Moray Portfolio, and the interlink with
the other Portfolios in Grampian, along with developing the governance
framework for this whole system approach 
3. Refresh the Strategic Plan during 2022, building on the learning of the last 2
years of the pandemic, and the transformational change that has begun 
4. Using the 22/23 to 26/27 Medium Term Financial Framework to match the
ambitions of the Strategic Plan so that services are sustainable  
5. Work with the Digital Health and Care Innovation Centre as part of the Moray
Growth Deal to test new ways of working that benefit the Moray population and
bring improvements to the delivery of health and social care 
6. Continue to extend the reach of Self Directed Support with an ambition for
Moray to be an exemplar in this arena of supporting our residents in innovative
ways that promote independence and choice 
7. With the potential delegation of Children’s Social Work and Criminal Justice to
the Moray IJB, better align service delivery in the Portfolio to the benefit of our
residents, where care is seamless and access is clear 
Key Governance challenges going forward will involve: 
• Providing capacity to meet statutory obligations whilst managing expectation
and rising demand for services, with a backlog of demand from the pandemic,
and wider societal economic challenges which will also drive demand; 
• As a Board, difficult decisions will require to be made in ensuring we operate
within available funding whilst meeting the needs of our residents; 
• Continue to address our work force challenges in respect of recruitment and
retention;  
Page 82

Page 83

Moray Integration Joint Board Annual Accounts 2021/22 40 
ANNUAL GOVERNANCE STATEMENT (continued) 
• Continuing to work closely with NHS Grampian and Moray Council to build on
existing relationships and establishing collaborative leadership, and to
maximise the opportunities from an expanded health and social care remit with
the Portfolio approach, including Dr Grays hospital, and the potential
delegation to the IJB of Children’s Social Work and Criminal Justice Services; 
• The challenges being faced from the pandemic are expected to be a continued
focus for additional scrutiny for an extended period of time, and how well we
manage the recovery of service delivery. 
• Continue to implement the recommendations of internal audit to further
improve key controls and engage with KPMG on the audit of Commissioned
services. 
Statement 
In our respective roles as Chair and Chief Officer of the MIJB, we are committed to
ensuring good governance and recognise the contribution it makes to securing
delivery of service outcomes in an effective and efficient manner.  This annual
governance statement summarises the MIJB’s current governance arrangements, and
affirms our commitment to ensuring they are regularly reviewed, developed and fit for
purpose.  Whilst recognising that improvements are required, as detailed earlier in the
statement, it is our opinion that a reasonable level of assurance can be placed upon
the adequacy and effectiveness of the MIJB’s governance arrangements. 
The immediate challenge will be to continue to meet all operational demands as we
continue to recover from the Covid-19 Pandemic and through re-mobilisation whilst
not compromising the safety of employees and people that use our services; beyond
that, pressure on financial settlements is set to continue during the incoming period,
and we will continue to engage with our Partners and the wider community to agree
plans and outcome targets that are both sustainable and achievable.  Taking those
forward will be challenging as we aim to fulfil the nine Health and Wellbeing national
outcomes and the strategic priorities identified and detailed in our Strategic Plan. 
Good governance remains an essential focus in delivering services in a way that both
meets the needs of communities and discharges statutory best value responsibilities. 
…………………………    ………………………
Dennis Robertson     Simon Bokor-Ingram
Chair of Moray IJB     Chief Officer 
Page 83

Page 84

Moray Integration Joint Board Annual Accounts 2021/22 41 
INDEPENDENT AUDITOR’S REPORT 
Independent auditor’s report to the members of Moray Integration Joint Board
and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of Moray
Integration Joint Board for the year ended 31 March 2022 under Part VII of the
Local Government (Scotland) Act 1973. The financial statements comprise the
Comprehensive Income and Expenditure Statement, Movement in Reserves
Statement, Balance Sheet and notes to the financial statements, including
significant accounting policies. The financial reporting framework that has been
applied in their preparation is applicable law and UK adopted international
accounting standards, as interpreted and adapted by the Code of Practice on Local
Authority Accounting in the United Kingdom 2021/22 (the 2021/22 Code).
In my opinion the accompanying financial statements:
• give a true and fair view in accordance with applicable law and the 2021/22
Code of the state of affairs of the body as at 31 March 2022 and of its income
and expenditure for the year then ended;
• have been properly prepared in accordance with UK adopted international
accounting standards, as interpreted and adapted by the 2021/22 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts (Scotland)
Regulations 2014, and the Local Government in Scotland Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards
on Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by
the Accounts Commission for Scotland. My responsibilities under those standards
are further described in the auditor’s responsibilities for the audit of the financial
statements section of my report. I was appointed under arrangements approved by
the Accounts Commission on 10 April 2017. The period of total uninterrupted
appointment is six years. I am independent of the body in accordance with the ethical
requirements that are relevant to my audit of the financial statements in the UK
including the Financial Reporting Council’s Ethical Standard, and I have fulfilled my
other ethical responsibilities in accordance with these requirements. Non-audit
services prohibited by the Ethical Standard were not provided to the body.  I believe
that the audit evidence I have obtained is sufficient and appropriate to provide a
basis for my opinion.
Page 84

Page 85

Moray Integration Joint Board Annual Accounts 2021/22 42 
INDEPENDENT AUDITOR’S REPORT (Continued)
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the
preparation of the financial statements is appropriate.
Based on the work I have performed, I have not identified any material uncertainties
relating to events or conditions that, individually or collectively, may cast significant
doubt on the body’s ability to continue to adopt the going concern basis of
accounting for a period of at least twelve months from when the financial statements
are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the body’s
current or future financial sustainability. However, I report on the body’s
arrangements for financial sustainability in a separate Annual Audit Report available
from the Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of material
misstatement that I identified and my judgements thereon.
Responsibilities of the Interim Chief Financial Officer and Moray Integration Joint
Board for the financial statements
As explained more fully in the Statement of Responsibilities, the Interim Chief
Financial Officer is responsible for the preparation of financial statements that give a
true and fair view in accordance with the financial reporting framework, and for such
internal control as the Interim Chief Financial Officer determines is necessary to
enable the preparation of financial statements that are free from material
misstatement, whether due to fraud or error.
In preparing the financial statements, the Interim Chief Financial Officer is
responsible for assessing the body’s ability to continue as a going concern,
disclosing, as applicable, matters related to going concern and using the going
concern basis of accounting unless there is an intention to discontinue the body’s
operations.
The Moray Integration Joint Board is responsible for overseeing the financial
reporting process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial
statements as a whole are free from material misstatement, whether due to fraud or
error, and to issue an auditor’s report that includes my opinion. 
Page 85

Page 86

Moray Integration Joint Board Annual Accounts 2021/22 43 
INDEPENDENT AUDITOR’S REPORT (Continued)
Reasonable assurance is a high level of assurance, but is not a guarantee that an
audit conducted in accordance with ISAs (UK) will always detect a material
misstatement when it exists. Misstatements can arise from fraud or error and are
considered material if, individually or in the aggregate, they could reasonably be
expected to influence the decisions of users taken on the basis of these financial
statements.
Irregularities, including fraud, are instances of non-compliance with laws and
regulations. I design procedures in line with my responsibilities outlined above to
detect material misstatements in respect of irregularities, including fraud. Procedures
include:
• obtaining an understanding of the applicable legal and regulatory framework
and how the body is complying with that framework; 
• identifying which laws and regulations are significant in the context of the
body; 
• assessing the susceptibility of the financial statements to material
misstatement, including how fraud might occur; and 
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance with laws
and regulations.
The extent to which my procedures are capable of detecting irregularities, including
fraud, is affected by the inherent difficulty in detecting irregularities, the
effectiveness of the body’s controls, and the nature, timing and extent of the audit
procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than
irregularities that result from error as fraud may involve collusion, intentional
omissions, misrepresentations, or the override of internal control. The capability of
the audit to detect fraud and other irregularities depends on factors such as the
skilfulness of the perpetrator, the frequency and extent of manipulation, the degree of
collusion involved, the relative size of individual amounts manipulated, and the
seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial
statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of my auditor’s
report. 
Page 86

Page 87

Moray Integration Joint Board Annual Accounts 2021/22 44 
INDEPENDENT AUDITOR’S REPORT (Continued)
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited part of the
Remuneration Report
I have audited the part of the Remuneration Report described as audited. In my
opinion, the audited part of the Remuneration Report has been properly prepared in
accordance with The Local Authority Accounts (Scotland) Regulations 2014.
Other information 
The Interim Chief Financial Officer is responsible for other information in the annual
accounts. The other information comprises the Management Commentary, Annual
Governance Statement, Statement of Responsibilities and the unaudited part of the
Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider
whether the other information is materially inconsistent with the financial statements
or my knowledge obtained in the course of the audit or otherwise appears to be
materially misstated. If I identify such material inconsistencies or apparent material
misstatements, I am required to determine whether this gives rise to a material
misstatement in the financial statements themselves. If, based on the work I have
performed, I conclude that there is a material misstatement of this other information, I
am required to report that fact. I have nothing to report in this regard.
My opinion on the financial statements does not cover the other information and I do
not express any form of assurance conclusion thereon except on the Management
Commentary and Annual Governance Statement to the extent explicitly stated in the
following opinions prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management
Commentary and Annual Governance Statement
In my opinion, based on the work undertaken in the course of the
audit:
• the information given in the Management Commentary for the financial year
for which the financial statements are prepared is consistent with the
financial statements and that report has been prepared in accordance with
statutory guidance issued under the Local Government in Scotland Act 2003;
and 
• the information given in the Annual Governance Statement for the financial
year for which the financial statements are prepared is consistent with the
financial statements and that report has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework (2016).
Page 87

Page 88

Moray Integration Joint Board Annual Accounts 2021/22 45 
INDEPENDENT AUDITOR’S REPORT (Continued)
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or 
• the financial statements and the audited part of the Remuneration Report are
not in agreement with the accounting records; or 
• I have not received all the information and explanations I require for my audit.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the
wider scope responsibilities specified in the Code of Audit Practice, including those in
respect of Best Value, are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with
Part VII of the Local Government (Scotland) Act 1973 and for no other purpose. In
accordance with paragraph 120 of the Code of Audit Practice, I do not undertake to
have responsibilities to members or officers, in their individual capacities, or to third
parties. 
Brian Howarth ACMA CGMA  
Audit Director
Audit Scotland
4th Floor
8 Nelson Mandela Place
Glasgow
G2 1BT 
Page 88

Page 89

Moray Integration Joint Board Annual Accounts 2021/22 46 
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT 
This statement shows the cost of providing services for the year ended 31 March 2022
according to generally accepted accounting practices.   
2020/21  2021/22
Net Expenditure  Net Expenditure
Restated  
£ 000  £ 000
5,587 Community Hospitals 5,477
4,853 Community Nursing 4,932
8,546 Learning Disabilities 9,691
8,649 Mental Health 9,542
1,143 Addictions 1,259
152 Adult Protection & Health Improvement 158
15,183 Care Services Provided In-House 16,238
19,835 Older People & Physical & Sensory Disability
Services 20,536
1,497 Intermediate Care and Occupational Therapy 1,828
8,067 Care Services Provided by External Providers 8,271
7,725 Other Community Services 8,460
3,033 Administration & Management 2,404
871 Other Operational services 1,192
17,451 Primary Care Prescribing 18,310
17,541 Primary Care Services 18,307
4,526 Hosted Services 4,632
808 Out of Area Placements 832
613 Improvement Grants 758
6,702 Strategic Funds & Other Resources 7,937
12,620 Set Aside  13,044
145,402 Cost of Services 153,808   
151,557 Taxation and Non-Specific Grant Income (note 5) 164,487
(6,155) (Surplus) or Deficit on provision of Services (10,679)
(6,155) Total Comprehensive Income and Expenditure (10,679) 
The 2020/21 figures have been restated to take into account the administration and
Management area being split into administration and management and other
operational services. 
There are no statutory or presentational adjustments which reflect the MIJB’s
application of the funding received from partners.  The movement in the General Fund
balance is therefore solely due to the transactions shown in the Comprehensive
Income and Expenditure Statement.  Consequently, an Expenditure and Funding
Analysis is not provided in these annual accounts. 
Page 89

Page 90

Moray Integration Joint Board Annual Accounts 2021/22 47 
MOVEMENT IN RESERVES STATEMENT 
This statement shows the movement in the year on the Moray Integration Joint Boards
(MIJB) reserves.  The movements which arise due to statutory adjustments which
affect the General Fund balance are separately identified from the movements due to
accounting practices.  Additional detail included within note 7 on page 46. 
Movement of Reserves During
2021/22  
General
Fund
Balance   
£000    
Opening Balance at 1 April 2021   (6,342)    
Total Comprehensive Income and
Expenditure 
(10,679)        
(Increase) or Decrease in 2021/22   (10,679)        
Closing Balance at 31 March 2022                    (17,021)     
Movement of Reserves During
2020/21  
General
Fund
Balance   
£000    
Opening Balance at 1 April 2020   (187)    
Total Comprehensive Income and
Expenditure 
(6,155)        
(Increase) or Decrease in 2020/21   (6,155)        
Closing Balance at 31 March 2021                    (6,342)     
Page 90

Page 91

Moray Integration Joint Board Annual Accounts 2021/22 48 
BALANCE SHEET 
The Balance Sheet shows the value of the Moray Integration Joint Board’s (MIJB)
assets and liabilities as at the balance sheet date.  The net assets of the MIJB (assets
less liabilities) are matched by the reserves held by the MIJB. 
31 March
2021
£000    Notes
31 March
2022
£000    
6,342 Short Term Debtors 6 17,021 
Current Assets      
- Short Term Creditors  - 
Current Liabilities      
- Provisions  -            
Long Term Liabilities      
6,342 Net Assets           17,021    
6,342 Usable Reserve General Fund 7 17,021            
6,342 Total Reserves  17,021 
The unaudited annual accounts were issued on 30 June 2022 and the audited annual
accounts were authorised for issue on 26 January 2023.
.
The Annual Accounts present a true and fair view of the financial position of the
MIJB as at 31 March 2022 and its income and expenditure for the year then ended. 
Deborah O’Shea FCCA 
Interim Chief Financial Officer 
Page 91

Page 92

Moray Integration Joint Board Annual Accounts 2021/22 49 
NOTES TO THE FINANCIAL STATEMENTS
Note 1 Significant Accounting Policies 
General Principles 
The Financial Statements summarise the Moray Integration Joint Board’s (MIJB)
transactions for the 2021/22 financial year and its position at the year-end of 31 March
2022. 
The MIJB was established under the requirements of the Public Bodies (Joint Working)
(Integration Joint Boards) (Scotland) Act 2014 and is a Section 106 body as defined
in the Local Government (Scotland) Act 1973. 
The Financial Statements are therefore prepared in compliance with the Code of
Practice on Local Authority Accounting in the United Kingdom 2021/22, supported by
International Financial Reporting Standards (IFRS), unless legislation or statutory
guidance requires different treatment. 
The accounts are prepared on a going concern basis, which assumes that the MIJB
will continue in operational existence for the foreseeable future.  The historical cost
convention has been adopted. 
Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when settlement in
cash occurs. In particular: 
• Expenditure is recognised when goods or services are received and their
benefits are used by the MIJB.
• Income is recognised when the MIJB has a right to the income, for instance by
meeting any terms and conditions required to earn the income, and receipt of
the income is probable.
• Where income and expenditure have been recognised but settlement in cash
has not taken place, a debtor or creditor is recorded in the Balance Sheet.
• Where debts may not be received, the balance of debtors is written down. 
Funding
The MIJB is primarily funded through funding contributions from the statutory funding
partners, Moray Council and the Grampian Health Board.  Expenditure is incurred as
the MIJB commissions’ specified health and social care services from the funding
partners for the benefit of service recipients in Moray area. 
Cash and Cash Equivalents
The MIJB does not operate a bank account or hold cash.  Transactions are settled on
behalf of the MIJB by the funding partners.  Consequently the MIJB does not present
a ‘Cash and Cash Equivalent’ figure on the balance sheet.  The funding balance due
to or from each funding partner as at 31 March is represented as a debtor or creditor
on the MIJB’s Balance Sheet.   
Page 92

Page 93

Moray Integration Joint Board Annual Accounts 2021/22 50 
NOTES TO THE FINANCIAL STATEMENTS (continued) 
Note 1 Significant Accounting Policies (continued) 
Employee Benefits
The MIJB does not directly employ staff.  Staff are formally employed by the funding
partners who retain the liability for pension benefits payable in the future.  The MIJB
therefore does not present a Pensions Liability on its Balance Sheet. 
The MIJB has a legal responsibility to appoint a Chief Officer.  More details on the
arrangements are provided in the Remuneration Report.  The charges from the
employing partner are treated as employee costs.  Where material the Chief Officer’s
absence entitlement as at 31 March is accrued, for example in relation to annual leave
earned but not yet taken. 
Charges from funding partners for other staff are treated as administration costs. 
Reserves
The MIJB’s reserves are classified as either Usable or Unusable Reserves.   
The MIJB’s only Usable Reserve is the General Fund.  The balance of the General
Fund as at 31 March shows the extent of resources which the MIJB can use in later
years to support service provision. 
Indemnity Insurance
The MIJB has indemnity insurance for costs relating primarily to potential claim
liabilities regarding Board members.  The Grampian Health Board and Moray Council
have responsibility for claims in respect of the services that they are statutorily
responsible for and that they provide. 
Unlike NHS Boards, the MIJB does not have any ‘shared risk’ exposure from
participation in the Clinical Negligence and Other Risks Indemnity Scheme (CNORIS). 
The MIJB participation in the CNORIS scheme is therefore analogous to normal
insurance arrangements. 
Note 2 Critical Judgements and Estimation Uncertainty 
In applying the accounting policies, the MIJB has had to make certain judgements
about complex transactions or those involving uncertainty about future events.  There
are no material critical judgements. 
During the overall Covid-19 response, a number of additional costs have been incurred
beyond business as usual. The MIJB has followed national guidance regarding these
and a range of additional costs are included in the MIJB’s accounts reflecting the MIJB
acting as principal in the transactions including:-
• social care sustainability costs;
• all increase direct care Covid-19 costs;  
Page 93

Page 94

Moray Integration Joint Board Annual Accounts 2021/22 51 
NOTES TO THE FINANCIAL STATEMENTS (continued) 
Note 2 Critical Judgements and Estimation Uncertainty (continued) 
A further range of Covid-19 related costs and associated funding have not been
recognised in the MIJB’s accounts in accordance with national accounting guidance.
In these cases Moray Council is acting as principal and MIJB as the agent. This
includes:-
• £0.527m related to PPE and testing kits provided by NHS National Services
Scotland to Moray for social care services. 
Note 3 Events after the Reporting Period 
The unaudited accounts were issued by Deborah O’Shea, Interim Chief Financial
Officer on 30 June 2022 and the audited accounts were authorised for issue on 26
January 2023.   
Events taking place after this date are not reflected in the financial statements or notes. 
Where events taking place before this date provided information about conditions
existing at 31 March 2022, the figures in the financial statements and notes have been
adjusted in all material respects to reflect the impact of this information. 
Note 4 Expenditure and Income Analysis by Nature       
2020/21  2021/22
£000  £000
60,984 Services commissioned from Moray
Council
65,020
84,391 Services commissioned from The
Grampian Health Board
88,760
27 Auditor Fee: External Audit Work 28
145,402 Total Expenditure 153,808   
(151,557) Partners Funding Contributions and Non-
Specific Grant Income
(164,487)
(6,155) (Surplus) or Deficit on the Provision of
Services
(10,679) 
Page 94

Page 95

Moray Integration Joint Board Annual Accounts 2021/22 52 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 5 Taxation and Non-Specific Grant Income 
2020/21  2021/22
£000  £000
45,060 Funding Contribution from Moray Council 50,549
106,497 Funding Contribution from The Grampian
Health Board
113,938
151,557 Taxation and Non-specific Grant
Income
164,487 
The funding contribution from The Grampian Health Board shown above includes
£13.044m   in respect of ‘set aside’ resources relating to acute hospital and other
resources. These are provided by The Grampian Health Board who retains
responsibility for managing the costs of providing the services. The MIJB however has
responsibility for the consumption of, and level of demand placed on, these resources.   
Note 6 Debtors 
31 March
2021 
31 March
2022
£000  £000
6,160 The Grampian Health Board 15,739
182 Moray Council 1,282
6,342 Debtors 17,021 
Amounts owed by the funding partners are stated on a net basis. Creditor balances
relating to expenditure obligations incurred by the funding partners but not yet settled
in cash terms are offset against the funds they are holding on behalf of the MIJB. 
Page 95

Page 96

Moray Integration Joint Board Annual Accounts 2021/22 53 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 7 Usable Reserve: General Fund 
The MIJB holds a balance on the General Fund for two main purposes: 
• To earmark, or build up, funds which are to be used for specific purposes in the
future, such as known or predicted future expenditure needs. This supports
strategic financial management. 
• To provide a contingency fund to cushion the impact of unexpected events or
emergencies. This is regarded as a key part of the MIJB’s risk management
framework. 
The table below shows the movements on the General Fund balance: 
Earmarked
Reserves    
General
Reserves
PCIP &
Action 15
Covid-19 Other
Earmarked
Total  
£000 £000 £000 £000 £000
Balance at 1 April
2020 
- 187 - - 187
Transfers (out)/in
2020/21 
1,598 1,480 2,725 352 6,155
Balance at 31
March 2021 
1,598 1,667 2,725 352 6,342
Transfer out
2021/22 
(341) - - - (341)
Transfers in
2021/22 
- 664 6,291 4,065 11,020
Balance at 31
March 2022 
1,257 2,331 9,016 4,417 17,021 
Primary Care Improvement Fund (PCIP) - The purpose of this fund is to ring fence
funding received from the Scottish Government as part of its Primary Care
Transformation Plan, this includes Action 15 funding as part of this plan. 
Covid – 19 – are funds received by Scottish Government during 2021/22 being held
in an earmarked reserve to support the MIJB through the pandemic and remobilisation. 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 8 Agency Income and Expenditure 
Page 96

Page 97

Moray Integration Joint Board Annual Accounts 2021/22 54 
On behalf of all IJB’s within The Grampian Health Board, the MIJB acts as the lead
manager for Grampian Medical Emergency Department (GMED) and Primary Care
Contracts.  It commissions services on behalf of the other IJBs and reclaims the costs
involved. The payments that are made on behalf of the other IJBs, and the
consequential reimbursement, are not included in the Comprehensive Income and
Expenditure Statement (CIES) since the MIJB is not acting as principal in these
transactions. 
The amount of expenditure and income relating to the agency arrangement is shown
below: 
2020/21  2021/22
£000  £000
10,032 Expenditure on Agency Services  9,136
(10,032) Reimbursement for Agency Services (9,136)
- Net Agency Expenditure excluded
from the CIES
-
Page 97

Page 98

Moray Integration Joint Board Annual Accounts 2021/22 55 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 9 Related Party Transactions 
The MIJB has related party relationships with The Grampian Health Board and Moray
Council.  In particular the nature of the partnership means that the MIJB may influence,
and be influenced by, its partners. The following transactions and balances included
in the MIJB’s accounts are presented to provide additional information on the
relationships.   
Transactions with the Grampian Health Board 
2020/21  2021/22
£000  £000
(106,497) Funding Contributions received from the
NHS Board
(113,938)
84,208 Expenditure on Services Provided by the      
NHS Board
88,558
183 Key Management Personnel: Non-Voting
Board Members
202
(22,106) Net Transactions with The Grampian
Health Board
(25,178) 
Key Management Personnel: The Chief Officer and Chief Financial Officer, are non-
voting Board members and are both employed by The Grampian Health Board and
recharged to the MIJB.  Details of the remuneration of both officers are provided in the
Remuneration Report.  The Chief Officer is a joint appointment made by Moray Council
and The Grampian Health Board and is jointly accountable to the Chief Executives of
both organisations, as such this post is jointly funded.  The Chief Financial Officer,
whilst a Board appointment, does not share this arrangement of funding. 
Balances with the Grampian Health Board 
31 March
2021 
31 March
2022
£000  £000
6,160 Debtor balances: Amounts due from The
Grampian Health Board
15,739
6,160 Net Balance due from The Grampian
Health Board
15,739 
Page 98

Page 99

Moray Integration Joint Board Annual Accounts 2021/22 56 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 9 Related Party Transactions (continued) 
Transactions with Moray Council 
2020/21  2021/22
£000  £000
(45,060) Funding Contributions received from the
Council
(50,549)
60,945 Expenditure on Services Provided by the
Council
64,970
66 Key Management Personnel: Non-Voting
Board Members
78
15,951 Net Transactions with Moray Council 14,499 
Balances with Moray Council 
31 March
2021 
31 March
2022
£000  £000
182 Debtor balances: Amounts due from Moray
Council
1,282
- Creditor balances: Amounts due to Moray
Council
-
182 Net Balance due from Moray Council 1,282 
Page 99

Page 100

Moray Integration Joint Board Annual Accounts 2021/22 57 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 10 VAT 
The MIJB is not registered for VAT and as such the VAT is settled or recovered by the
partners.  The VAT treatment of expenditure in the MIJB accounts depends on which
of the partners is providing the services as each of these partners are treated
differently for VAT purposes. 
VAT payable is included as an expense only to the extent that it is not recoverable
from Her Majesty’s Revenue and Customs. VAT receivable is excluded from income. 
Note 11 Accounting Standards That Have Been Issued but Have Yet To Be
Adopted 
The Code requires the MIJB to identify any accounting standards that have been
issued but have yet to be adopted and could have material impact on the accounts.   
There are no accounting standards issued but not yet adopted that impact on the
2021/22 financial statements. 
Page 100

Page 101

Moray Integration Joint Board Annual Accounts 2021/22 58
Page 101

Page 102

Page 102