Page 1

Audit, Performance and Risk Committee 
Thursday, 24 November 2022 
Council Chambers 
NOTICE IS HEREBY GIVEN that a Meeting of the Audit, Performance and Risk
Committee, Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Thursday, 24 November 2022 at 14:00 to consider the business noted below. 
AGENDA 
1. Sederunt 
2. Declaration of Member's Interests 
3. Minutes of meeting of 25 August 2022 3 - 4
4. Action Log of Meeting of 25 August 2022 5 - 6
5. Quarter 2 Performance Report 7 - 14
6. Internal Audit Section - Update Report 15 - 18
7. Strategic Risk Register Report 19 - 46
8. Internal Audit Section Completed Projects Report 47 - 66
9. Directions Monitoring Report 67 - 72 
Page 1

Page 2

MORAY INTEGRATION JOINT BOARD 
SEDERUNT 
Councillor Scott Lawrence  (Chair)  
Mr Derick Murray  (Voting Member)
Mr Sandy Riddell  (Voting Member)
Councillor John Divers  (Voting Member)
Mr Sean Coady  (Member)
Mr Graham Hilditch  (Member)
Mr Simon Bokor-Ingram  (Member)
Ms Sonya Duncan  (Member)
Ms Deborah O'Shea  (Member)
Mr Neil Strachan  (Member)  
Mr Stuart Falconer  (Non-Voting Member) 
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 2

Page 3

MINUTE OF MEETING OF THE AUDIT, PERFORMANCE AND RISK COMMITTEE 
Thursday, 25 August 2022 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Simon Bokor-Ingram, Mr Sean Coady, Councillor John Divers, Mr Graham Hilditch,
Councillor Scott Lawrence, Mr Derick Murray, Deborah O'Shea, Mr Sandy Riddell 
APOLOGIES 
Sonya Duncan, Mr Steven Lindsay, Ms Jane Mackie, Mr Neil Strachan 
IN ATTENDANCE 
Also in attendance were the Chief Internal Auditor and Tracey Sutherland,
Committee Services Officer.   
1.         Welcome and Apologies 
Sandy Riddell as Chair of the meeting welcomed everyone and apologies were noted.  
2.         Declaration of Member's Interests 
Mr Riddell declared that he is Chair of the Mental Welfare Commission.  There were
no other declarations of Members' interests in respect of any items on the agenda.  
3.         Minutes of meeting of 30 June 2022 - am 
The minute of the meeting of 30 June 2022 was submitted and approved.  
4.         Minute of Meeting of 30 June 2022 - pm 
The minute of the meeting of 30 June 2022 was submitted and approved.  
Item 3.
Page 3

Page 4

5.         Action Log of Meeting of 30 June 2022 
The Action Log of the meeting of 30 June 2022 was considered and updated
accordingly.  
6.         Quarter 1 Performance Report 
A report by the Corporate Manager updated the Committee on performance as at
Quarter 1 (April to June 2022)  
Following consideration the Committee agreed to note:  
i) the performance of local indicators for Quarter 1 (April to June 2022) as
presented in the Performance Report as at Appendix 1; and    
ii) the analysis of the local indicators that have been highlighted and actions being
undertaken to address performance that is outside of acceptable target ranges
as detailed in Appendix 1.    
7.         Internal Audit Section - Update Report 
A report by the Chief Internal Auditor provided the Committee with an update on
progress against the 2022/23 Audit Plan.  
Following consideration the Committee agreed to note the audit update.  
8.         Strategic Risk Register Report 
A report by the Chief Officer provided the Committee with an overview of the current
strategic risks, along with a summary of actions which are in place to mitigate those
risks, updated August 2022.  
Following consideration the Committee agreed to:  
i) note the updated Strategic Risk Register included in Appendix 1; and    
ii) note the Strategic Risk Register will be further refined to align with the
transformation and redesign plans as they evolve.    
9.         Internal Audit Section - Completed Projects Report 
A report by the Chief Internal Auditor provided the Committee with an update on audit
work completed since the last meeting of the Committee.  
Following consideration the Committee agreed to note the audit update.   
Page 4

Page 5

MEETING OF MORAY INTEGRATION JOINT BOARD 
AUDIT, PERFORMANCE AND RISK COMMITTEE 
THURSDAY 25 August 2022 
ACTION LOG 
Item
No.
Title of Report Action Required Due Date Action By Update for 
24 November 2022
1.  Action Log of
Meeting dated 27
August 2020
Payment Verification Assurance Update –
once through appropriate NHSG Governance
route. 
June 2022 Sean Coady Payment verification
has not yet resumed
– verbal update
November 2022 
2.  Civil
Contingencies
Resilience
Standards Report
Annual Assurance Report from HSCM Civil
Contingencies Group
March 2023 Corporate
Manager
Scheduled
3.  External Review
of Commissioned
Services
External Review to be commissioned. August 2022 Chief Officer Draft report received.
Special Meeting of
AP&R to be arranged
once final report from
KPMG has been
received.
4.  Quarter 1
Performance
Update report from the Psychological Service
to be presented following email sent in July
March 2023 Corporate
Manager
This action to be
revisited and
actioned. 
Item 4.
Page 5

Page 6

Page 6

Page 7

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 24 NOVEMBER 2022 
SUBJECT: QUARTER 2 (JULY TO SEPTEMBER 2022) PERFORMANCE
REPORT 
BY:  CORPORATE MANAGER 
1. REASON FOR REPORT 
1.1 To update the Audit, Performance and Risk Committee on performance as at
Quarter 2 (July to September 2022). 
2. RECOMMENDATION 
2.1 It is recommended that the Audit, Performance and Risk Committee
consider and note the performance of local indicators for Quarter 2 (July
- September 2022) 
3. BACKGROUND 
3.1   The purpose of this report is to ensure the Moray Integration Joint Board
(MIJB) fulfils its ongoing responsibility to ensure effective monitoring and
reporting on the delivery of services and on the programme of work as set out
in its Strategic Plan. 
Item 5.
Page 7

Page 8

4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 Local Indicators are assessed on their performance via a common
performance monitoring Red, Amber, and Green (RAG) traffic light rating
system. 
RAG scoring based on the following criteria:
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within agreed
tolerance.
RED If Moray is performing worse than target by more than agreed
tolerance. 
4.2 There is no detailed report attached due to system pressures.   
Summary
4.3 Performance within Health and Social Care Moray (HSCM) as demonstrated
by the agreed indicators up to the end of quarter 2 of the financial year
2022/23 is showing as variable. Four of the indicators are presenting as green
and six are red. This represents a reduced performance compared to quarters
3 and 4 in 2021/22 and similar to quarter 1 in 2022. This is a reflection of the
pressure being placed on the service that has continued during quarter 2. 
EMERGENCY DEPARTMENT (ED) - RED
4.4 There was a slight decrease in the attendance rate per 1,000 this quarter from
24.3 to 24, exceeding the target and above the number presenting at the
same period last year. The trend over the past 5 months has been a steady
and consistent increase each month, in contrast to the gradual decrease each
month in the previous 8 months. This increase in demand will not only put
pressure on ED but will undoubtedly have an impact on other services. 
DELAYED DISCHARGES – RED   
4.5 The number of delays at the June snapshot was 47, a slight increase from the
previous quarter, remaining well above the revised target of 10. Although the
number of bed days lost due to delayed discharges reduced from 1207 last
quarter to 1197 this is still almost 4 times the target. Both indicators are back
to the levels last seen in the winter of 2019/20, just before the COVID-19
pandemic regulations were introduced. 
EMERGENCY ADMISSIONS – AMBER
4.6 The steady monthly increase in the rate of emergency occupied bed days for
over 65s, noted in previous reports, continued this quarter. Since the end of
quarter 4 last year the rate has increased from 2,140 to 2,469, exceeding the
target of 2,037 per 1,000 population. The emergency admission rate per 1000
population for over 65s has continued to reduce further this quarter from 177.5
to 172.4.  Similarly, the long-term trend for the number of people over 65
admitted to hospital in an emergency in the previous 12 months also reduced
from 122 to 118.6 over the same period. Both indicators are now GREEN but
given the continuing increase in the emergency occupied bed-days for over
65s the overall status for the three indicators combined is AMBER. 
HOSPITAL RE-ADMISSIONS - GREEN
4.7 The 28-day re-admissions improved and was below target at 6.7%, and the 7-
day re-admissions also reduced to below target at 3%.
Page 8

Page 9

MENTAL HEALTH – RED  
4.8 The service has been unable to meet the 18 week LDP1 target since
September 2021.  This has declined steadily and in the second quarter of
2022 the % of people who were referred into the service and treated within 18
weeks had fallen to 33%. 
STAFF MANAGEMENT – RED   
4.9 NHS employed staff sickness levels (to the end of August 2022) have
declined from 4.2% to 4.5%, still close to the target of 4%. Data for council
staff sickness not included in this report due to staffing and time constraints. 
Figure 1 - Performance Summary 
*SMO1 data to Sept 2022 
5. AREAS NOT MEETING TARGETS 
Emergency Department
5.1 The rate per 1,000 population presenting at ED is 24, above the required
performance level of 21.7 and displaying an increasing trend. In addition,       
the proportion of patients seen within the 4-hour target time continues to
reduce. Prior to March 2020 over 95% of attendees at ED were seen within 4
hours, generally reducing to 90% in the winter months. Performance is below
target and continues to deteriorate. 
1 Local Delivery Plan Standards; priorities set and agreed between the Scottish Government and NHS
Boards. Previously known as HEAT Targets and Standards. 
Page 9

Page 10

Figure 2 – A&E Attendance rates (all ages) – (TrakCare) 
5.2 The Medicine and Unscheduled service continue to working closely with the
hospital team and wider partnership to improve flow across the hospital. The
hospital continues to experience a significant number of breaches within the
ED, many attributed to long bed waits, secondary to delayed discharges and
an extensive community hospital waiting list. This regularly equates to 30
percent of the bed base at Dr Gray’s Hospital (DGH). The team has re-
established daily breach meetings to establish causes and help mitigate
recurring trends. They are also working with the discharge coordinator/social
work team and wider Moray partnership to review and manage this on a daily
basis.   
5.3 Regular, daily, safety briefs are being held to help address any urgent issues
with crowding, Scottish Ambulance Service waits and reduced performance,
working across the NHSG systems to establish solutions. Minor injury patients
are now re-directed regularly and a review of minor injury patients in
Moray/DGH has been commenced under the leadership of the Head of
Service HSCM and his team. This is ongoing. 
5.4 The Medicine and Unscheduled service are also engaging with colleagues
across NHSG as part of the redesign of unscheduled care, whilst working to
complete the ED service plan which includes plans to reduce the numbers of
attendances at ED and improve the performance figures.  This includes the
design of the rapid assessment and discharge unit based in DGH. This unit
will help reduce the pressures faced by ED and improve the flow and
performance within the department. 
5.5 The ED continues to face significant recruitment issues which have impacted
on the service, requiring locum doctors and agency nurses to be
engaged.  Regular staffing assurance meetings take place with the hospital
manager and the team are active in rota management. Finally, a Business
Impact Assessment has been completed to help mitigate the impact of gaps in
0
5
10
15
20
25
30
Jan-19
Mar-19
May-19
Jul-19
Sep-19
Nov-19
Jan-20
Mar-20
May-20
Jul-20
Sep-20
Nov-20
Jan-21
Mar-21
May-21
Jul-21
Sep-21
Nov-21
Jan-22
Mar-22
May-22
Jul-22
Sep-22
Rate per 1000 Population
A&E Attendance Rate
Rate Target
Page 10

Page 11

the rota and to ensure the safety of the department, and the well-being of its
staff. 
Delayed Discharge
5.6 The number of people waiting to be discharged from hospital remains high,
and there are no indications that the target of 10 people is going to be met
soon. The Delayed Discharge indicators (DD-01 and DD-02) continue to be
red and remain well above the new targets set at the end of quarter 3 of
2020/21. 
Figure 3 – Delayed Discharges (all ages) – (PHS, Delayed Discharges publication) 
5.7 The reasons for the above target levels remain the same; there is an
additional demand from the increase in patients presenting at ED. Previous
reports have noted the increased frailty and more complex needs of patients. 
5.8 External providers of care within Moray were also experiencing similar high
levels of staff absence as were care homes. This significantly limited the
ability to meet the demand for care at home. 
5.9 The measures outlined in previous reports did appear to be reducing the
number of delayed discharges. However, by the end of quarter 2 the situation
had reversed, and more people were facing delays when ready to be
discharged from hospital. 
Emergency Admissions 
5.10 Emergency Admission rates for the over 65s (EA-02) have reduced further
during quarter 1, continuing the trend observed in previous quarters. Note that
the rate of 172.4 per 1,000 population is now back below the target based on
the 2019 average of 179.9 per 1,000 population. Similarly, the number of
people in this category admitted during the past 12 months (EA-03) has
followed a similar trend. At the end of quarter 2 the rate had reduced to 118.6
per 1,000 population, below the target of 123.4 per 1,000 population (also
based on the 2019 average). 
5.11 However, the reduction in admissions may be due to the lack of available
beds, in part caused by delays in discharging people and also generally high
0
10
20
30
40
50
60
Jan-19
Mar-19
May-19
Jul-19
Sep-19
Nov-19
Jan-20
Mar-20
May-20
Jul-20
Sep-20
Nov-20
Jan-21
Mar-21
May-21
Jul-21
Sep-21
Nov-21
Jan-22
Mar-22
May-22
Jul-22
Sep-22
Number
Delayed Discharges (including code 9) at Census Point
Number Target
Page 11

Page 12

demand. Furthermore, the over 65s admitted for an emergency are staying in
hospital longer. This has been increasing steadily since the start of 2021 and
continued to increase each month during quarter 2 reaching a rate of 2,469
bed-days per 1,000 population, exceeding the target of 2,037 per 1,000
population. 
Mental Health 
5.12 Referrals continue to be received by the team and they are working hard to
reduce waiting times, offering short notice appointments when it is practical to
do so. Following a workshop in June 2022, the Moray psychological therapies
steering group was to reconvene and begin the planning of the work streams
identified. 
Staff Management
5.13 The Moray vaccination programme continues to be delivered across all
relevant groups as a priority. 
5.14 Provider Services continue to face significant challenges, with high staff
absences and vacancies adding real dilemmas for front-line delivery.  This
fluctuating and high level of absence requires close management, with
supervisors and managers often having to deliver care. 
5.15 Managers are still being faced with daily challenges to find staff to allocate to
rosters and to maintain the delivery of their services, and to prioritise the
services being provided. 
5.16 Recent quarterly reports have highlighted the issues of staff burn-out and the
staffing situation facing the HSCM services. There is not much more to add
this quarter other than to say that managers and the HR teams continue to
spend much of their time on addressing the shortfall in staff and meeting the
demand for care. 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2019 – 2029”
Performance management reporting is a legislative requirement under
section 42 of the Public Bodies (Joint Working) (Scotland) Act 2014.   
In addition to publishing an Annual Performance Report, the Moray
Integration Scheme requires that the MIJB will “monitor the performance
of the delivery of integrated services using the Strategic Plan on an
ongoing basis” (para 5.2.2 of the Moray Integration Scheme refers). 
(b) Policy and Legal
None directly associated with this report. 
(c) Financial implications
None directly associated with this report. 
(d) Risk Implications and Mitigation
There are no risk issues arising directly from this report. The long-term
impact of the COVID-19 on the Health and Social Care system are still
Page 12

Page 13

unknown and performance measurement will remain flexible to enable
the service to be prepared and react to any future developments. 
(e) Staffing Implications  
None directly associated with this report. 
(f) Property
None directly associated with this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required for the Performance
Framework because there will be no impact, as a result of the report, on
people with protected characteristics. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined for
this policy/activity. It should be noted that extreme weather events, such
as the recent storms, are expected to occur more frequently and with
greater ferocity in future years. In the longer-term there are likely to be
issues with the reduction in availability and increases in costs of fossil
fuels that will pose challenges for the delivery of care services to people
living in rural areas. 
(i) Directions
There are no directions arising from this report. 
(j) Consultations
For Health and Social Care Moray the Chief Officer, Corporate Officer
and Service Managers in relation to respective areas have been
consulted as has Tracey Sutherland, Committee Services Officer, Moray
Council and their comments are incorporated in the report. 
7. CONCLUSION 
7.1 This report provides the MIJB with an overview of the performance of
specified Local and National indicators and outlines actions to be
undertaken to improve performance in Section 4. 
Authors of Report: Sonya Duncan, Corporate Manager 
Background Papers: Available on request
Ref: 
Page 13

Page 14

Page 14

Page 15

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 24 NOVEMBER 2022 
SUBJECT: INTERNAL AUDIT SECTION - UPDATE REPORT 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 To provide an Internal Audit update to Committee members. 
2. RECOMMENDATION 
2.1 The Audit, Performance and Risk Committee is asked to consider and
note this audit update. 
3.  BACKGROUND   
3.1 Public Sector Internal Audit Standards (PSIAS) require the Chief Internal
Auditor to prepare and present reports to committee on internal audit’s activity
relative to the audit plan and on any other relevant matters. 
4.  KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 In accordance with the Audit Plan for 2022/23, a review has been undertaken
into the systems and procedures in the management and security of data,
including the transfer of data between the Council and Care Providers.
Further to discussions with the Internal Audit Providers of NHS Grampian,
Aberdeen City and Aberdeenshire Councils, it was agreed to coordinate the
audit process in order to provide an overall opinion on the control
environment. Further to a recent communication, it has not proved possible
for the NHS Grampian Internal Audit Provider to participate as a review by the
Information Commissioner has taken precedence. I am pleased to report the
audit within Moray has been completed, and the draft report issued to the
Service. I intend to provide the executive summary and recommendations to
the next meeting of the Audit, Performance and Risk Committee. 
Audit Plan 2023/24
4.2 Preparation has begun to agree on the Audit Plan for 2023/24. Internal Audit’s
approach to annual audit planning is risk-based with all areas which may be
subject to audit review contained within an ‘audit universe.’ The audit universe
Item 6.
Page 15

Page 16

is reviewed and updated on an ongoing basis to include all significant
activities and systems. 
4.3 The consultation process with officers has also provided the opportunity to
establish timescales for responding to requests for information during an audit
review and in responding to recommendations.   
Public Sector Internal Audit Standards
4.4 The Local Authority Accounts (Scotland) Regulations 2014 require that ‘a
local authority must operate a professional and objective internal auditing
service in accordance with recognised standards and practices in relation to
internal auditing’. The recognised standards adopted by all Scottish Councils
are the Public Sector Internal Audit Standards (PSIAS) developed by the
Chartered Institute of Public Finance and Accountancy and the Chartered
Institute of Internal Auditors. The standards include a requirement for an
annual self-assessment. 
4.5 Internal monitoring of performance against these standards has been ongoing
in previous years. However, a more structured self-assessment has recently
been undertaken in preparation for the next External Quality Assessment,
scheduled for 2023.   
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Moray
Partners in Care 2019 – 2029” 
Internal audit work supports good governance and assists in securing
appropriate systems of internal control. 
(b)  Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications
Audit reports highlight risk implications and contain recommendations for
management to address as a means of mitigating.   
(e) Staffing Implications
No implications directly arising from this report 
(f)   Property
No implications. 
(g)  Equalities/ Socio Economic Impacts
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report.
Page 16

Page 17

(i) Directions      
None directly arising from this report. 
(j)   Consultations      
There have been no direct consultations during the preparation of this       
report.     
6. CONCLUSION 
6.1 This report provides committee with an update on internal audit work
progressed in the latest review period. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/24112022 
Page 17

Page 18

Page 18

Page 19

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 24 NOVEMBER 2022 
SUBJECT: STRATEGIC RISK REGISTER – NOVEMBER 2022 
BY:  CHIEF OFFICER 
1. REASON FOR REPORT 
1.1 To provide an overview of the current strategic risks, along with a summary of
actions which are in place to mitigate those risks, updated on November 2022. 
2. RECOMMENDATION 
2.1 It is recommended that the Audit, Performance and Risk Committee
(APR) agree to: 
i) consider and note the updated Strategic Risk Register included in
APPENDIX 1; and 
ii) note the Strategic Risk Register will be further refined to align with
the transformation and redesign plans as they evolve 
3. BACKGROUND 
3.1 The strategic risk register is reviewed regularly by the Senior Management
Team as part of a robust risk monitoring framework, to identify, assess and
prioritise risks related to the delivery of services in relation to delegated
functions, particularly any which are likely to affect the delivery of the Strategic
Plan. 
3.2 The Moray Integration Joint Board (MIJB) Strategic Risk Register is attached
to this report at APPENDIX 1 and sets out the inherent risks being faced by
the MIJB, together with a current assessment on the level of the risks and
mitigating actions being taken to reduce the impact of the risks.  This report is
presented to Clinical Care Governance committee for their oversight and
comment. 
3.3 Risk scores are weighted, based on assessment according to their likelihood
and corresponding impact, as per Section 5 of the MIJB Risk Policy.   
Item 7.
Page 19

Page 20

3.4 The Strategic Risks received an initial review to ensure they align to the
Moray Partners in Care 2019-2029 strategic plan which was agreed at MIJB
on 28 November 2019 (para 13 of the minute refers). 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The Risk Management Framework review was completed and outcome was
approved by the Board on 25 June 2020 (para 9 of the minute refers). The
approved Risk Appetite Statements have been included in APPENDIX 1. 
4.2 The return to ‘business as usual’ from the Covid-19 pandemic continues to
progress. However, there has not been any relief in the system over the
summer period, and is already facing increased staff absences due to
seasonal illness and leave. 
4.3 Work is being progressed to ensure the Risk Register is updated in the
timescales dictated by the criteria. The action has been added as a standing
item on the SLG agenda. 
4.4 The continued safe delivery of services is a priority and as such, dedicated
management time is being directed to support oversight of operational risks. 
Grampian Operational Escalation System (GOPES) continues to be utilised to
assist in the identification of pressure points across the whole system so that
they can be addressed and prioritised appropriately. A review of these
principals was revisited during a workshop across the Moray Portfolio on
17/10/22. This highlighted the ongoing pressures facing the entire system and
allowed for worthy discussions about how best to capture those pressures. 
4.5 The ability to cope with unforeseen incidents continues to provide challenges
to the systems.  The national cyber-attack on NSS Scotland systems debrief
is planned to conclude in November 2022. It is intimated that improved
practices across the system have been captured as part of their ongoing
planning and recovery phase. These will be captured and shared to SMT and
MIJB in due course. 
4.6 The possibility of planned power outages raised by SSEN. Civil contingency
groups are discussing options and reviewing Business Continuity Plans to
ensure planning is underway. Discussions between Scottish Government and
Senior Management are also taking place around Protected Sites. 
4.7 Ballots are proceeding for the possibility of Staff Industral Action. The
outcomes of most of these ballots is expected in early November. Planning
meetings are already underway to address the possible outcomes and
actions. Plans for cross system working are underway. 
4.8 There continues to be significant financial risk in the system.  Future reports
will incorporate updates to the MIJB. 
4.9 Recruitment and selection to staff vacancies continues to prove challenging
across most services.  Staff wellbeing continues to be a key priority and a
significant emphasis is being placed on ensuring that everyone is provided
with the support that is readily available, where it is required.  The issues that
have been identified and factored into the developing workforce plan. This
Page 20

Page 21

ongoing work will be progressed with partners across Grampian for
recruitment. 
4.10 Prior to March 2021, IJB’s were reliant on NHS Board and Council specialist
advisors for support. Currently HSCM is represented by the Corporate
Manager on all matters involving Civil Contingencies. Unlike other
partnerships, HSCM does not employ a subject matter expert on this topic and
this has been highlighted and placed on the Strategic Risk Register, with a
High rating. 
4.11 The new Care at Home contract, with Allied working in partnership with the
Council’s internal provision, started in October 2021. This contract limited
Self-Directed Support (SDS) option 3 supply to Allied and internal
provision.  Prior to the new Care at Home contract we also contracted with the
other providers under SDS option 3. This ended, after a short extension, in
April 22. The providers were then only contracted to supply care under SDS
options 1 and 2. 
4.12 There are currently a significant number of hours per week of unmet need for
care at home, with little change in these figures this year. There is an urgent
need to increase supply to support the Health & Social Care system. 
4.13 The Moray Portfolio Additional Flow Huddle has agreed to explore the
potential for expanding the Care at Home SDS option 3 provision with a view
to increasing the supply of Care at Home. Moray Council Procurement
support using the existing Scotland Excel national Care at Home framework
for other external care at home providers. The plan is to provide a 12 month
contract for these other providers to support capacity and create a wider
group of support over the next few months. This workplan has been brought to
the attention of the Chair and Vice Chair of the MIJB to try and address the
unmet need identified. 
4.14 As plans evolve, the Strategic Risk Register will continue to be updated to
ensure that it reflects any potential risks to realise the vision set out in our
Strategic Plan. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2019-2029”
The MIJB requires effective governance arrangements for those services
and functions delegated to it and Risk Management systems are integral
to this. 
(b) Policy and Legal
As set out in the terms of reference, the Board has responsibility to
provide assurance of the adequacy of the risk management framework. 
There are no legal implications arising from this report.    
Page 21

Page 22

(c) Financial implications
There are no direct financial implications arising from this report however
the Board should note the failure to manage risks effectively could have
a financial impact for the MIJB. 
(d) Risk Implications and Mitigation
This report forms part of the governance arrangements for identifying
and managing strategic risks of the MIJB.  The risks are outlined in the
body of the report in section 4. 
(e) Staffing Implications
There are no additional staffing implications arising from this report.   
(f) Property
There are no property implications arising from this report. 
(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required because there are no
service, policy or organisational changes being proposed. 
(h) Climate Change and Biodiversity Impacts
There are no impacts arising from this report. 
(i) Directions
None arising from this report. 
(j) Consultations
Consultation on this report has taken place with Sean Coady, Head of
Service. 
6. CONCLUSION 
6.1 This report and appendices contains proposed risk appetite statements
that, when approved, will underpin the MIJB approach to strategic
decision making.   
6.2 The report outlines the current position and recommends the Board note
the revised and updated version of the Strategic Risk Register. 
Author of Report:  Sonya Duncan, Corporate Manager
Background Papers:   held by HSCM
Ref: 
Page 22

Page 23

Appendix 1 
HEALTH AND SOCIAL CARE MORAY STRATEGIC RISK REGISTER 
AS AT 15 NOVEMBER 2022 
Item 7.
Page 23

Page 24

Appendix 1 
RISK SUMMARY 
1. The Moray Integration Joint Board (MIJB) does not function as set out within the Integration Scheme, Strategic Plan and in-line
with Standing Orders and fails to deliver its objectives or expected outcomes.  
2. There is a risk of MIJB financial failure in that the demand for services outstripping available financial resources.  Financial
pressures being experienced by the funding Partners will directly impact on decision making and prioritisation of MIJB.
3. Inability to recruit and retain qualified and experienced staff to provide safe care whilst ensuring staff are fully able to manage
changes resulting from integration.
4. Inability to demonstrate effective governance and effective communication and engagement with stakeholders.
5. Inability to cope with unforeseen external emergencies or incidents as a result of inadequate emergency and resilience planning.
6. Risk to MIJB decisions resulting in litigation/judicial review.  Expectations from external inspections are not met.
7. Inability to achieve progress in relation to national Health and Wellbeing Outcomes.  Performance falls below acceptable level.
8. Inability to progress with delivery of Strategic Objectives and Transformation projects as a result of inability to resolve data sharing
and data security requirements.
9. Requirements for support services are not prioritised by NHS Grampian and Moray Council. 
RISK RATING LOW  MEDIUM HIGH  VERY HIGH
RISK MOVEMENT  DECREASE NO CHANGE INCREASE 
The process for managing risk is documented out with the MIJB Risk Policy. 
Page 24

Page 25

Appendix 1 
Description of
Risk: 
Regulatory
The Integration Joint Board (IJB) does not function as set out within the Integration Scheme, Strategic Plan and
Scheme of Administration and fails to deliver its objectives or expected outcomes.  
Lead: Chief Officer
Risk Rating:  Low/ medium/ high/ very high  MEDIUM
Risk Movement:  Increase/ decrease/ no change  INCREASING
Rationale for Risk
Rating: 
The strategic plan “Partners in Care” 2019 to 2029 was developed and launched in December 2019.  
Membership of IJB committees has recently changed due to the elections in May.  An amendment to the Scheme to
increase membership by one from each of the partner organisations was ratified in March 2022 by the Scottish
Government following due process and approval by Moray Council and NHS Grampian Board.
During the initial Covid 19 response, normal business was suspended and emergency arrangements were implemented. 
IJB, CCG and APR meetings restarted during August 2020.  Weekly meetings were instigated with Chair/Vice Chair and
Chief Officer and these continue.  
Progress is underway to review the Strategic Plan “Partners in Care” 2019 to 2029 which will be completed by December
2022. 
Rationale for Risk
Appetite: 
The Board, staff and providers across Moray are all committed to ensuring high standards of clinical care & governance
through operational policies.  Innovation and new ways of working may mean traditional regulations do not exist, or are
contradictory. 
We will only take regulatory risks knowingly, following consultation with the relevant regulatory body and where we have
clear risk mitigation in place. 
Controls: • Integration Scheme.
• Strategic Plan “”Partners in Care” 2019 to 2029
• Governance arrangements formally documented and approved by MIJB January 2021.
• Agreed risk appetite statement.
• Performance reporting mechanisms.
• Consultation with legal representative for all reports to committees and attendance at committee for key reports.
• Standing orders have been reissued to all members
Mitigating
Actions: 
Induction sessions were held for new IJB members after May elections. .  
IJB member briefings are held regularly as development sessions. 
Conduct and Standards training held for IJB Members in June 2022 provided by Legal Services .
1
Page 25

Page 26

Appendix 1 
SMT regular meetings and directing managers and teams to focus on priorities. 
Regular development sessions held with IJB and System Leadership Group
Strategic Plan and locality management structure is in place The work that has been progressed through the Covid19
response has escalated developments in some areas as a matter of priority.  This has been achieved through
collaborative working with partner organisations and the third sector. 
Assurances: • Audit, Performance and Risk Committee oversight and scrutiny.
• Internal Audit function and Reporting
• Reporting to Board.
Gaps in
assurance: 
The Covid 19 Response caused a delay in producing the Transformation Plans which in turn has impacted on
communication and engagement with staff and partners in respect of the intended outcomes.  Work is underway on the
refresh of the Strategic plan and will incorporate the work being taken forward for Self-Directed support, Three
conversations, Locality Planning, Hospital at home and Hospital without walls. A delivery plan will be developed
alongside the refreshed Strategic Plan. 
Current
performance:
Scheme of administration is reported when any changes are required.  
Legal advisors are currently working on the requirements to the integration scheme in relation to the proposed
delegation of Children’s and Families and Justice Services.
Report presenting the Strategic Plan, Communication Strategy, Organisational Development and Workforce Plans,
Performance Framework and the draft Transformational Plan were presented and approved at MIJB on 28 November
2019
Governance Framework was approved by IJB 28 January 2021.Re-appointment of Standards Officer agreed by IJB 31
March 2022
Members Handbook has been updated and circulated to all members in June 2022. 
Comments: Strategic Planning and Commissioning Group approved the generic Terms of Reference and Chairs of the
transformation boards at the meeting on 19 December 2019.  It was intended that these boards would be established
by April 2020 however this work was on hold due to Covid19 and is now restarted but will incorporate the changes on
new ways of working and will recommend a revised way forward.  The interim Strategy and Planning Lead is now
taking this forward and prioritising and focusing on strategic planning and priorities over the short and longer term. 
Page 26

Page 27

Appendix 1 
2
Description of
Risk: 
Financial
There is a risk of MIJB financial failure in that the demand for services outstrips available financial resources.  Financial
pressures being experienced both by the funding Partners and Community Planning Partners will directly impact on
decision making and prioritisation of MIJB.
Lead: Chief Officer/Chief Financial Officer
Risk Rating:  Low/ medium/ high/ very high VERY HIGH
Risk Movement:  Increase/ decrease/ no change NO CHANGE
Rationale for Risk
Rating: 
Whilst the 2020/21 and 2021/22 settlement saw additional investment for health and social care that was passed through
to the MIJB, there remains a significant pressure due to the recurring core overspend, since most of the new investment
related to new commitments. 
Financial settlements are set to continue on a one year only basis, which does not support sound financial planning.  
In addition, many uncertainties have arisen through the Covid response and continue as we continue to remobilise.  The
full impact is not yet quantifiable. 
The Revenue Budget 2022/23 was approved by MIJB on 31 March 2022 as a balanced budget.  A small savings plan of
£0.11 million was approved.  Additional Scottish Government investment is provided again for 2022/23, this is to meet
additional policy commitments in respect of adult social care pay uplift for externally provided services and seeks to
ensure that capacity can be maximised and ensuring system flow.  The final outturn position will be finalised and reported
to the MIJB in June where it is anticipated there will be a small general reserve.
The update medium Term Financial Framework was presented as part of the budget papers on the 31st March 2022
however, it is imperative that this is further reviewed during the 2022/23 year to ensure alignment with the upcoming
revisions to the Strategic Plan.
Rationale for Risk
Appetite: 
The Board recognises the financial constraints all partners are working within. While we are cautious and open about
accepting financial risks this will be done: 
• Where a clear business case or rationale exists for exposing ourselves to the financial risk 
• Where we can protect the long term sustainability of health & social care in Moray   
The Covid-19 recovery continues to place additional risk on the MIJB finances as we continue through the pandemic,
recover and transform. Whilst we are now officially in the recovery phase there has been no change in the pressures
felt by the system during the summer period.
Controls: There is an interim arrangement for CFO cover from Moray Council. Permanent recruitment efforts have not been
successful. The Chief Officer is working with both the Council and NHS Finance Leads to secure a longer term interim
arrangement. 
Page 27

Page 28

Appendix 1 
The CFO and Senior Management Team have worked together to address further savings which will be presented to
the Board for approval as part of the budget setting procedures for 2022/23.  This should be a focus of continuous
review to ensure any investment is made taking cognisance of existing budget pressures.  A revised Financial
Framework was presented to the MIJB on 31 March 2022, and a further review will take place once the current
strategic plan has been reviewed to assure alignment.
Mitigating
Actions: 
Risk remains of the challenge that the MIJB can deliver transformation and efficiencies at the pace required whilst dealing
with the pressures that are emerging as a result of the pandemic.    
Financial information is reported regularly to both the MIJB, Senior Management Team and System Leadership Group. 
The Chief Officer and Chief Financial Officer (CFO) continue to engage in finance discussions with key personnel of both
NHS Grampian and Moray Council.  These conversations have continued throughout the pandemic phase. 
Chief Officer and CFO will continue to engage with the partner organisations in respect of the financial position throughout
the year. Cross partnership performance meetings are in with partner CEOs, Finance Directors and the Chair/Vice Chair
of the MIJB. 
Assurances: MIJB oversight and scrutiny of budget.  Reporting through MIJB, NHS Grampian Board and Moray Council.
Gaps in
assurance:
None known
Current
performance:
An overspend of £692,246 was reported to the IJB at 30 June 2022.
The Scottish Government have announced their intention to reclaim surplus Covid reserves, the details of this are as yet
not confirmed.
Comments: Senior managers continue to work with Chief Officer and Chief Financial Officer to address the continuing financial
challenge, continuing to seek efficiencies and opportunities for real transformation as we look to make efficient and
effective investment in services that are truly transformational. There are additional pressures from the cost of living
crisis, increasing energy bills, inflation and the potential for staff industrial action. 
Page 28

Page 29

Appendix 1 
3
Description of
Risk: 
Human Resources
(People):
Inability to recruit and retain qualified and experienced staff to provide and maintain sustainable, safe care, whilst
ensuring staff are fully able to manage change resulting from response to external factors such as the impact of Covid
and the actions that arose from the recommendations from the Independent Review of Adult Social Care 2021.
Lead: Chief Officer
Risk Rating:  Low/ medium/ high/ very high HIGH
Risk Movement:  Increase/ decrease/ no change INCREASING
Rationale for Risk
Rating: 
There continues to be issues with recruitment to some front line services that require specific skills and experience.  This
has been the case for some time now and continues to place pressure on existing staff.  Allied Health Professions, Social
Work are two particular areas experiencing difficulties with obtaining people with the appropriate skills and training. Care
at Home staffing levels are pressured for Internal services and externally with local providers all experiencing the same
difficulties. 
There are also impacts on recruitment of Dentists and other graduates arising from Covid as the number graduating has
reduced during the period.
The various impacts of Covid-19 has  placed a significant strain on the Partnerships resources across frontline and
support functions and this has resulted in delays for the progress of projects relating to the achievement of strategic
objectives.  
The Care Homes in Moray have continued to do well to maintain their staffing levels throughout the pandemic however
there are examples where there is a reliance on agency staffing. The difficulty with recruitment and retention of staff to
care at home roles in particular is still being experienced.  Efforts are being made to provide support but the situation
remains challenging. 
The transition from EU membership has not presented any specific concerns for workforce and this will continue to be
monitored. 
The impact of budgetary decisions by the Council in relation to reducing staffing levels has reduced levels of support
provided in some key areas for Health and Social Care Moray (HSCM), such as ICT, HR, Legal and design.  
Rationale for Risk
Appetite:
Safety risks that could result in harm to service users, staff or the public are inherent in Health & Social Care services.
The safety of individuals is paramount therefore standards of safety management and clinical care have to be high, and
the Board will continue to seek assurances this is the case. 
The Board’s ambition is for health & social care to be people centred. This means supporting people in decision making
about their own health & care, which may expose individuals to higher risk where they make an informed decision. 
The Board will also seek to balance individual safety risks with collective safety risks to the community. 
Controls: Management structure in place with updates reported to the MIJB.
Page 29

Page 30

Appendix 1 
Organisational Development plan in place and Workforce Plans are being updated to align to the new strategic plan. 
Continued activity to address specific recruitment and retention issues.  The chief social worker reviewed the situation
with managers and employed a Consultant Practitioner to develop options for addressing some of the particular issues
affecting social work services in Moray and to provide support to managers and staff 
Management competencies continue to be developed through Kings Fund training although this was suspended due to
Covid19. 
Communications & Engagement Strategy was approved in November 2019 and is being implemented. 
Council and NHS performance systems in operation with HSCM reporting being further developed and information
relating to vacancies, turnover and staff absences is integral to this.  
Managers are highlighting any areas of concern and where appropriate this is identified in operational risk registers.
HSCM services have commenced weekly reporting of workforce sit reps for Senior Management Team oversight
highlighting vacancies, annual leave, sickness absence and Covid impacts so that issues can be identified and
assessed quickly.  
Mitigating
Actions: 
System re-design and transformation.  
Organisational Development Plan and Workforce plan were updated and approved by MIJB in November 2019. The
updated Workforce plan has been submitted to Scottish Government and comments were received by the HSCP in
October 2022. These are currently being worked through.  These plans are core documents for the Workforce Forum
which has recently re-commenced following a temporary suspension during the first quarter of this year due to Covid
impact. 
Staff Wellbeing is a key focus and there are many initiatives being made available to all staff including training, support,
information and access to activities. 
Locality Managers are developing the Multi-disciplinary teams in their areas and some project officer support has been
provided to develop the locality planning model across Moray.
Lead Managers are involved in regional and national initiatives to ensure all learning is adopted to improve this position.
Lead Managers and Professional Leads are linked to University Planning for intakes and programmes for future
workforce development. 
Assurances: Operational oversight by Moray Workforce Forum has resumed and will report to MIJB in accordance with the agreed
Governance framework.
The HSCM Response Group was in place over the whole period of the Covid19 pandemic providing focussed
leadership around emerging issues and resolving them.  This group stood up again in April and is meeting daily whilst
Page 30

Page 31

Appendix 1 
the system is pressured, this will be reviewed as the situation evolves.  The Heads of Service are co-ordinating and
escalate to SMT where necessary. These meetings have been increased as service needs dictate.
Gaps in
assurance:
Further work required to develop workforce plans to reflect strategic plan implementation programmes once they are
agreed.
Current
performance: 
The IMatter survey results for 2021 were received by managers for review and action plans.  Preparatory work is
commencing on the action plans for IMatter 2022 
Discussions are underway with HR in both Council and NHS to develop access to appropriate HR information at a
summarised level to facilitate the necessary workforce planning and subsequent monitoring of plans. 
There continues to be a need for more streamlining in recruitment processes as the delay in approval to recruit to having
a member of staff available is in excess of 8 weeks. 
There is also a lack of suitable applicants for various posts which is impacting on ability to appoint for some roles. 
Comments: Staffing issues are owned by the Systems Leadership Group who will work collaboratively across the system to seek
opportunities to make jobs more attractive where it has proved difficult to recruit in the past.   
For some professions there is a potential risk that staff move from one position to a new position within HSCM will just
move the vacancy to elsewhere in the system, so Senior Management Team are aware of this risk and taking it into
account in considerations for vacancies. 
There is a concern that if the continuing system issues and beds continue to be blocked for new patients it will mean
operations cannot be scheduled to reduce the backlog and key staff may not have the necessary time in surgery to
maintain skills.  This in turn may add to the staff retention issues within certain specialties. 
Page 31

Page 32

Appendix 1 
4
Description of
Risk: 
Reputation:
Inability to demonstrate effective governance and effective communication and engagement with stakeholders. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high MEDIUM
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Locality planning assessed as medium in relation to ability to work at the pace required and current workforce capacity. 
Performance framework to be further developed from a planning perspective to show the links through operational
service delivery to strategic objectives. 
Recent engagement with individuals representing their communities or third sector organisations in a variety of forums
is highlighting that problems with their capacity to fulfil our needs so more co-ordination and clearer focus is required to
ensure that the communication, engagement and outcomes are meeting identified needs.
Rationale for Risk
Appetite:
The Board is cautious but open about risks that could damage relationships with different stakeholders. It recognises
many of our aspirations depend on effective collaboration, coproduction and partnership working with a range of
stakeholders. The appetite also recognises that while the aspiration is to be a co-operative partner, some partners will
not be able to move at the same pace as us all the time. 
We will seek to protect relationships in the long term and will not set out to antagonise stakeholders deliberately. For
example, we must not be seen to exclude or prevent participation in the design of services where there is an appetite to
do this.   
We must be mindful that repairing relationships is easier when there is already a well of goodwill to draw on, and that
further damage to an already damaged relationship will not be conducive to good long term outcomes. 
Controls: Governance Framework approved by IJB January 2021
Communication and Engagement Strategy approved November 2019
Annual Governance statement produced as part of the Annual Accounts 2019/20 and submitted to External Audit. 
Annual Performance Report for 2020/21 was published in August 2021
Performance reporting mechanisms in place and being further developed through performance support team, home first
group and system leadership team.
Community engagement in place for key projects areas such as Forres, Keith and Lossiemouth with information being
made available to stakeholders and the wider public via HSCM website.
Page 32

Page 33

Appendix 1 
Participation of stakeholders in a variety of meetings such as Home First project, carer strategy, Strategic, Planning and
Commissioning groups.
Mitigating
Actions: 
Schedule of Committee meetings and development days in place and implemented. 
Good working relationship established with Audit Scotland, the MIJB’s appointed external auditors since 16/17.
Discussions at leadership meetings to ensure all standards are being met around Public Sector Equality Duty and
published where appropriate. There is a new programme of training to ensure all policies are Impact Assessed and the
findings are published. 
Annual Performance Report for 2021/22 will be published in November 2022 after being presented to the IJB.
Social media is actively used as a method of engaging with the public, with short videos focussing on particular
services being trialled. 
SMT have considered the existing arrangements for engagement with stakeholders and work is being undertaken to
align our framework with the Scottish Government “Planning with people guidance” and ensure that mechanisms are in
place across services to evidence and evaluate their impact.
Assurances: Oversight and scrutiny by Clinical and Care Governance Committee, Audit Performance and Risk Committee and
MIJB.  
Summary reports of minutes of MIJB meetings are submitted to Council committee and NHS Board.
Gaps in
assurance:
Progress on implementation of the Communication and Engagement Strategy has been impacted by the Covid 19. 
Due to the impact of COVID and requirement for social distancing the normal mechanism for engagement were not all
available.  More use is being made of social media and Microsoft teams and other options and methods for
engagement with staff are being used via NHSG such as videos on YouTube and one question surveys. 
Going forward there may be more opportunity for face to face meetings to take place again but it should be considered
that this will not be beneficial for all.
Current
performance:
Communications Strategy was reviewed approved by IJB November 2019.
Annual Performance Report 2020/21 published August 2021.  Audited Accounts for 2020/21 were publicised by
deadline 30 September 2021 
Due to Covid19 there have been increased levels of briefings to staff, the public and Chair/Vice Chair of MIJB with a
focus on the key elements of the response.  The staff newsletter commenced during Covid continues to be distributed. 
Comments: A communication cell was established as part of the Local Resilience Partnership Covid and storms response with
representation from Councils, HSCP and NHSG.  This was led by Aberdeen City Council and was an example of the
collaborative working that took place.  This forum provides assurance that messages to all stakeholders are consistent. 
Page 33

Page 34

Appendix 1 
It also ensures that there is support for our Communications Officer and resilience provided with the access to other
communication officers. 
There has been representation from the Home first project at the Wellbeing forum to facilitate sharing of information
and seeking views. 
Page 34

Page 35

Appendix 1 
5
Description of
Risk: 
Environmental:
Inability to cope with unforeseen external emergencies or incidents as a result of inadequate emergency and resilience
planning. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Due to the response requirements for Covid 19 progress has been made in a number of areas.  SMOC information is
updated, control room guidance updated and expanded, control centre protocols were implemented and remain in place
and management teams have responded in an agile, responsive and collaborative way under very challenging conditions. 
Teams continue to do their best but there are areas where they still feeling overwhelmed and service delivery is
challenging. 
With effect from March 2021 MIJB is defined as a Category 1 responder under the Civil Contingencies (Scotland) Act
and there are additional requirements for preparedness that is being taken forward in partnership with NHSG and Moray
Council emergency planners.
Rationale for Risk
Appetite:
The MIJB understand the requirement to meet the statutory obligations set out within the Civil Contingencies Act and
the Category 1 status applied in March 2021, and work with partner organisations to meet these obligations 
Controls: Winter Preparedness Plan was updated (but not tested as in previous years) alongside NHSG plans as NHSG
implemented their crisis management framework which required participation of partners at Daily connect meetings to
discuss and prioritise resource to address issues with system flow.
HSCM Civil Contingencies group established and meeting regularly to address priority subjects.
NHS Grampian Resilience Standards Action Plan approved (3 year).
Business Continuity Plans in place for most services although overdue a review in some areas.
Knowledge of critical functions and ability to respond quickly and effectively has been in evidence during incidents such
as Gas outages in Keith (January and February 2021) and Covid response, Storms (Arwen, Malik and Corrie) – debriefs
carried out and learning identified.
Debriefs being undertaken for HSCM, Moray (Council and HSCM) and Local Resilience Response with lessons learnt
being collated and prioritised for an action plan.
Mitigating
Actions: 
Information from the updated BIA/BCP informed elements of the Winter Preparedness Plan 
A Friday huddle is in place which gathers the status of services across the whole system to provide information and
contact details to the Senior Manager on Call (SMOC) over the weekend.
Page 35

Page 36

Appendix 1 
NHSG have introduced system wide daily huddles to manage the flow and allocation of resources which require
attendance from Dr Grays and HSCM. 
Practitioner group established for Moray with representation from HSCM, Dr Grays, Moray Council and NHSG to
discuss matters arising from the Local Resilience Forum and within our respective organisations.  In addition it will
provide a forum for discussion of the linkages between organisational response plans to ensure there are no gaps or
over reliance on particular local resources. 
HSCM continues to monitor the local situation regarding impacts on staffing and is engaged with NHSG emergency
planning arrangements and Council Response and Recovery management team to be ready to escalate response if
required. Work was undertaken within NHSG, Aberdeenshire HSCP and Aberdeen City HSCP to look at Surge flows
and establish a mechanism that will provide easy identification of “hot spots” across the whole system in Grampian, to
facilitate a collaborative approach to addressing the issues through the use of a common Operational Pressure
Escalation approach.  This work could underpin surge responses in winter and at other times of pressure and having a
standard approach across Grampian could aid communication and understanding.
Assurances: Audit, Performance and Risk Committee and NHS Grampian Civil Contingencies Group oversight and scrutiny.
HSCM Civil Contingencies group review specific risks and action plans to mitigate, developing plans and testing
arrangements in partnership with NHSG and Council
Gaps in
assurance:
Moray Integrated Joint Board (MIJB) was designated as a Catagory 1 responder under the Civil Contingencies Act 2004
from March 18th 2021. That designation imposed a number of statutory duties in terms of the Act and the associated
Scottish Regulations1.  MIJB has no dedicated, specialist in post and is reliant on the corporate manager covering this
increasingly demanding role in addition to other duties without the necessary background, knowledge, skills and
experience. This presents a potential organisational risk in terms of compliance and our ability to provide assurance on
discharging our civil contingency arrangements. 
The debriefs from the storms in 2021/22 have identified lessons learnt for Grampian Local Resilience Partnership and
more locally for the response co-ordination within Moray.    Action plans are being developed in collaboration with Moray
Council’s emergency planning officer to address the issues identified.  The main issues related to developing wider
awareness of roles and responsibilities,   and improving general awareness of response structures and meeting protocols. 
This will be incorporated into training schedules going forward.  It has also highlighted the need for a robust arrangement
for out of hours contact and clarity of roles and responsibilities across the system which is being discussed at SMT.
Option Appraisal discussions are intended to commence end October 2022. 
1 Civil Contingencies Act 2004 (Contingency Planning) (Scotland) Regulations 2005
Page 36

Page 37

Appendix 1 
Progress has been made however further work is required to address the targets in the implementation plan that have
not been met and the Resilience standards as identified by the NHSG Civil Contingencies Group. 
Due on ongoing system pressures and staff vacancies the Care for People plan and associated response structures has
not been completed to date. It is anticipated this will be completed by end October 2022, allowing for the operational
response plans to be drawn up. 
The intention is to hold a table top exercise with managers from HSCM and Moray Council to test the invocation
arrangements to ensure common understanding of roles and responsibilities.
Current
performance:
The Senior Management Team participated in Strategic Leadership in a Crisis training in 2020 and a programme of
further training for the wider management team is scheduled. 
Many services have business continuity arrangements and some are overdue for an update.  Work has progressed in
identification of a critical functions list for agreement by System Leadership Group that will inform planning
arrangements going forward.  There will need to be changes made to business continuity plans following the
implementation of additional ICT resources in services which have provided a greater deal of resilience for some
services and functions – albeit reliant on electricity supply.  A schedule of review and exercising of business impact
assessments and plans has been scheduled for this year across services. 
Annual report on progress against NHS resilience standards was reviewed by APR committee on 31 March 2022. 
Report on the implications of the designation as a Category 1 responder was presented to MIJB 25 November 2021. 
Information has been collated regarding dependencies of fuel for delivery of critical functions for submission to NHSG
and Council for inclusion in the planned response to the invocation of the National Fuel Plan. 
Work is currently underway to plan for possible National Power Outages across the UK. This is being co-ordianated
across Grampian to ensure all Partners are involved. 
Comments: The requirements of a Category 1 Responder continue to increase in demand placing increased pressures across
already overstretched services and managers. MIJB does not have a subject matter expert leading on these topics.  
Page 37

Page 38

Appendix 1 
6
Description of
Risk: 
Regulatory
Risk to MIJB decisions resulting in litigation/judicial review.  Expectations from external inspections are not met.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high MEDIUM
Risk Movement:  increase/decrease/no change INCREASING
Rationale for Risk
Rating: 
Considered medium risk due to the impact of Covid-19 and resultant efforts required to remobilise services and/or the
increase in workloads stretching a workforce that has been under sustained pressure for a considerable time. 
The ongoing impact of the Covid 19 pandemic is stretching resources to deliver care in the community across all
providers (internal and external) so there is a potential increased risk of expected standards not being achieved despite
the best efforts of all concerned.     
Rationale for Risk
Appetite: 
The Board, staff and providers across Moray are all committed to ensuring high standards of clinical care & governance
through operational policies.  Innovation and new ways of working may mean traditional regulations do not exist and
require to be developed, no longer apply, or are contradictory. 
We will only take regulatory risks knowingly, following consultation with the relevant regulatory body and where we have
clear risk mitigation in place. 
Controls: Clinical and Care Governance (CCG) Committee established and future reporting requirements identified
Clinical Risk Management and Practice Governance group has oversight of their respective professional standards and
feed into Clinical and Care Governance Group, which then escalates to CCG Committee as necessary.
High and Very High operational risks are reviewed by System Leadership Group monthly and a review of all risks will be
undertaken as part of the risk management framework. 
Complaints and compliments procedures in place and monitored.  A complaints co-ordinator role is being developed and
will be implemented to reduce duplication of effort, to provide co-ordination and improve information flow and support
managers in responses with the intention of streamlining processes and improving achievement of target timescales.  
Clinical incidents and risks are being reviewed on a weekly basis to ensure processes are followed appropriately and
consistently and responses are recorded in a timely manner.
Adverse events and duty of candour procedures in place and being actioned where appropriate and summary reports
submitted to CCG committee.
Page 38

Page 39

Appendix 1 
Reports from external inspections reported to appropriate operational groups and by exception to SMT for subsequent
reporting to CCG or Audit Performance and Risk Committee as appropriate, albeit there has been a reduction in some
areas of external inspection reporting during the Covid period due to social distancing restrictions 
Care Home Oversight Group meets to oversee and manage risks in care homes.
Children and Adult Protection services are being delivered and reported to their respective committee on a regular basis.
Mitigating
Actions: 
This risk is discussed regularly by the three North East Chief Officers. 
Additional resource has been allocated to support the analysis of information for presentation to CCG committee
All High and Very High risks are now brought before the senior management team in Moray. 
Process for sign off and monitoring actions arising from Internal and External audits has been agreed
Assurances: Audit, Performance and Risk and Clinical and Care Governance Sub-Committees oversight and scrutiny.
Governance Framework in place and operational. 
Gaps in
assurance:
Process for highlighting recurring themes or strategic expectations from external inspections requires further development
to ensure Committee has sight of significant issues. The vacancy of clinical governance co-ordinator has now been
appointed to and this will be part of their work programme. 
Current
performance:
External inspection reports are reviewed and actions arising are allocated to officers for taking forward. 
A summary of inspections is included in the Annual Performance report.   
The level is marked as an increasing risk on the basis that services are under pressure with the issues with staffing
capacity and the need to focus on delivery of critical functions which may mean external inspection are not the priority
at this moment in time. 
The Adult Support Protection inspection took place in April/May and our action plan has been developed. 
Comments: No major concerns have been identified for HSCM services in any audits or inspections during 2021/22. 
Page 39

Page 40

Appendix 1 
7
Description of
Risk: 
Operational
Continuity and
Performance:
Inability to achieve progress in relation to national Health and Wellbeing Outcomes.   
Performance of services falls below acceptable level.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Potential impacts to the wide range of services in NHS Grampian and Moray Council commissioned by the MIJB arising
from reductions in available staff resources as budgetary constraints impact. 
Unplanned admissions or delayed discharges place additional cost and capacity burdens on the service.   
The level of delayed discharges has remained high,  reflecting the sustained pressure in the system following the 
Covid -19 pandemic impact and the lack of availability of care in the community.  There are sustained focussed and
collective efforts by all those working in the pathway.  However this is a complex area and will require continued effort
to realise reductions and maintain them.   
Rationale for Risk
Appetite: 
The Board is cautious but open about risks that could affect outcomes that are priorities for people in Moray. There is a
slightly higher appetite to risks that may mean nationally set outcomes – that by design are not given a high priority in
Moray - are not met. 
This will only be accepted where there is a clear rationale, and preferably also a way of demonstrating what the IJB is
doing to meet the aspiration the outcome was created for. 
Controls: Performance Management reporting framework. 
2019 to 2029 “Partners in Care” Strategic Plan approved and refresh of Plan and development of implementation plans
underway.
Performance regularly reported to MIJB. Revised Scorecard being developed to align to the new strategic priorities.
Best practice elements from each body brought together to mitigate risks to MIJB’s objectives and outcomes.
Chief Officer and SMT managing workload pressures as part of budget process.
A daily Huddle and write up circulates the picture on performance across community and acute services for the
Portfolio and  service managers have a shared understanding of the pressures in the system and mitigations taking
Page 40

Page 41

Appendix 1 
place.  Work continues on  refinement of G-OPES (Grampian Operating Pressures and Escalation System) led by
NHSG but being developed locally to identify the triggers and resultant actions required in services to respond to
pressure points.
Mitigating
Actions: 
Service managers monitor performance regularly with their teams and escalate any issues to the System Leadership
Group (SLG) for further discussion to provide wider support, developing shared ownership and a greater understanding
across the whole system.   
Key operational performance data is collated and circulated daily to all managers.  A  Daily dashboard is held on
illuminate for managers to access to ensure any potential issues are identified quickly so action can be taken.  This
dashboard is being reviewed and will be further developed with the intention of further dashboards to provide a whole
system overview.  This has been discussed at SLG and agreed. 
Performance information is presented to the Performance sub group of Practice Governance Group to inform Social
Care managers of the trends in service demands so that resources can be allocated appropriately. 
Assurances: Audit, Performance and Risk Committee oversight. 
Operationally managed by service managers, summary reports to Practice Governance and clinical and care
governance group and to System Leadership Group.  Strategic direction provided by Senior Management Team. 
HSCM Response Group continues to meet and reviews the key performance information and actions that are required
to deliver the priority services.
Gaps in
assurance:
Development work in performance to establish clear links to describe the changes proposed by actions identified in the
Strategic Plan has recommenced but is at an early stage.  This will be progressed as the revised outcomes are
determined and associated KPI are identified.  Progress will be reported to future Board meetings. 
Current
performance:
The Covid19 pandemic impacted on all areas of the service and work is underway to take the learning and experience
gained during the response to collate performance information in dashboards to support mangers interpret the impact
of Covid19 on their services, now and going forward.
There are likely to be changes to ways of working and this may also have impact on the performance information
required. 
Comments: Locality profile information has been provided to Locality Steering Group/Locality Manager to inform potential priorities
for consideration in Localities and work will be taken forward regarding development of performance monitoring and
reporting of key performance indicators in relation to Localities once it has been determined what the intended
outcomes are.   
The delayed discharge group has produced an action plan for implementation and progress is being made.  
Page 41

Page 42

Appendix 1 
Practice Governance have reviewed their operational performance requirements and have a comprehensive data set
used to inform operational priorities.
The Home First priorities are being taken forward and updates are reported to this committee or MIJB on a regular
basis. 
Progress in this area has been hampered due to the increased demand for urgent or critical services requiring staff
resource to be prioritised to frontline service delivery. 
The Council has procured new modules for their performance reporting system Pentana and HSCM performance team
has been developing its its use for reporting. 
8
Description of
Risk: 
Transformation
Inability to progress with delivery of Strategic Objectives and Transformation projects. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
There are many issues that will impact on the ability to progress to deliver Strategic Objectives. 
The Strategic Planning & Commissioning group has been refreshed and re-launched and key work is being progressed. 
There was an initial meeting held on 22 September 2021 to consider terms of reference and the proposed structure for
oversight, prioritisation and assurance in relation to key developments, their fit with IJB strategy and enabling elements. 
The interim appointment of the Strategic and Planning Lead provides capacity to take this forward and to align the
priorities arising nationally, Grampian-wide and locally. 
The remobilisation plan for HSCM services that were suspended or reduced is progressing with Providers services and
social work implementing the IJB decision to return to delivery of both substantial and critical eligibility criteria.  Work has
progressed risk assessments are completed and assessments have been or are in the process of being reviewed to
ensure equality.   
The impact of Covid 19 on the population of Moray is still not fully realised.  It is therefore not possible to predict the
extent of the impact on the ability to progress with delivery of Strategic Objectives.  There are some aspects that have
progressed very well such as introduction of Near Me consultations but there are others that are more difficult to progress.
Page 42

Page 43

Appendix 1 
There is concern that due to the workloads and challenges over the last year that teams are weary and/or do not have
capacity at this moment in time, to progress with delivery of development plans at this moment in time.  In addition the
pandemic is still present in the community so services are still responding to the impacts it has for the population of
Moray.  Managers are working with teams to establish “readiness” and their capacity and sense of wellbeing and the
collated output will inform plans going forward. 
One key aspect to facilitate transformation is the need for progress in relation to ICT infrastructure, data sharing and data
security across the whole system.   Work was undertaken by NHS GRAMPIAN and partners to address the needs for
ICT kit and  information during the response to Covid. 
Rationale for Risk
Appetite:
The Board has a high appetite for risks associated with delivery of transformational redesign. The following should be
considered when accepting these risks:
• We understand and can mitigate other risk types that may arise, e.g. safety or financial within appetite 
• Service users are consulted and informed of changes in an open & transparent way 
• We will monitor the outcome and change course if necessary   
Controls: It is recognised that there will be significant changes taking place in Social Work practice with the implementation of the
Self Directed Support standards and the move to outcomes based services, so governance arrangements are being set
up to facilitate the same type of oversight and communication that is in place for the Home First programme. 
Mitigating
Actions: 
Integrated Infrastructure Group previously established, with ICT representation from NHSG and Moray Council, to
consider and provide solutions to data sharing issues and ICT infrastructure matters which is an area that will be taken
forward alongside the Moray Growth Deal projects.  Linkages to Infrastructure board and Information sharing groups
have been established albeit these meetings are not taking place regularly at the moment. 
Assurances: Strict ICT and data sharing policies and protocols in place with NHS Grampian and Moray Council. 
Gaps in
assurance:
Transformation/implementation planning is in development and will inform outcomes and performance reporting on the
delivery of the strategic plan. 
Protocol for access to systems by employees of partner bodies are in place.
Information Management arrangements to be developed and endorsed by MIJB.
Process of identification of issue and submission to data sharing group requires to be reinforced to ensure matters are
progressed. 
Page 43

Page 44

Appendix 1 
Smarter Working programmes are being progressed in partnership with Council and NHSG.
Current
performance:
Training programme to be developed on records management, data protection and related issues for staff working
across and between partners.   
Comments: Where national systems are involved it may not be possible to identify a solution however the issues will be able to be
raised at the appropriate level via the Grampian Data Sharing Group where all three partnerships are represented. 
Page 44

Page 45

Appendix 1 
9
Description of
Risk: 
Infrastructure
Requirements for support services are not prioritised by NHS Grampian and Moray Council.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Changes to processes and necessary stakeholder buy-in still bedding in. 
Moray Council is undertaking a Property review of office and depot accommodation and the potential impact for HSCM
services requires consideration.  The output was anticipated in October 2019 however due to changes with roles and
responsibilities within the Council however the paper has been out for consultation.  NHSG have advised that staff should
continue to work from home at present whilst policies and protocols are developed.  Moray Council have a dedicated MC
officer leading on a hybrid working plan with input from HSCM on their requirements. 
ICT infrastructure service plans in NHS Grampian and Moray Council are not yet visible to HSCM and development of
communication and engagement process is required. 
The impact of Covid has resulted in a change in ICT strategy for Moray Council.  Council employed staff requiring mobile
technology have now been provided with it and some staff are still working from home.
Rationale for Risk
Appetite: 
Low tolerance in relation to not meeting requirements.
Controls: Chief Officer has regular meetings with partners
Computer Use Policies and HR policies in place for NHS and Moray Council and staff. 
PSN accreditation secured by Moray Council 
Infrastructure Programme Board was established with Chief Officer as Senior Responsible Officer/Chief Officer
member of CMT. Process for submission of projects to the infrastructure board approved and implemented to ensure
appropriate oversight of all projects underway in HSCM.  The Board is not meeting at present, so in the interim, project
requests are being processed via Senior Management Team. The interim Strategy and Planning Lead will support the
the Infrastructure Programme Board for Moray portfoilio to be re established. 
Page 45

Page 46

Appendix 1 
Mitigating
Actions: 
Membership of the Board was reviewed and revised to ensure representation of all existing infrastructure processes and
funding opportunities.
Process for ensuring infrastructure change/investment requests developed
Dr Gray’s strategy (vision for the future)  is being produced collaboratively with input from NHSG and HSCM
management. 
Assurances: Infrastructure Programme Board functions to provide robust governance and assurance that proposed projects have a
robust business case and meets requirements of the respective partner organisations.  This board reports to Strategic
Planning and Commissioning Group.  Both of these groups are being refreshed and remobilised. 
Workforce Forum meeting regularly with representation of HR and unions from both partner organisations 
Gaps in
assurance:
Further work is required on developing the process for approval for projects so that they are progressed timeously.
Need to review all existing processes in relation to infrastructure changes/projects/investments and streamline to avoid
duplication of effort. 
Infrastructure Board is in development and priority issues are being addressed in relation to infrastructure and premises
risk. 
Legal services have reduced capacity to provide support due to budget cuts and vacancies so any requests may take
longer. 
Recruitment for vacancies takes considerable time due to various factors and is presenting a strain on services to maintain
normal service whilst covering vacancies.  There have been several posts that have had to go out to advert more than
once extending the time other staff are covering gaps. 
Current
performance:
No update.
Comments: Existing projects will be reviewed as part of the development of the transformation plans for the Strategic Plan to
ensure resources are being dedicated appropriately and aligned to the emerging Strategic priorities.  Our requirements
for support will be communicated via appropriate channels 
Page 46

Page 47

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 24 NOVEMEBER 2022 
SUBJECT: INTERNAL AUDIT SECTION– COMPLETED PROJECTS REPORT 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 To provide an update on audit work completed since the last meeting of the
Committee.   
2. RECOMMENDATION 
2.1 The Audit, Performance and Risk Committee is asked to consider and
note this audit update. 
3.  BACKGROUND 
3.1 Public Sector Internal Audit Standards (PSIAS) require the Chief Internal
Auditor to prepare and present reports to the committee on internal audit’s
activity relative to the audit plan and any other relevant matters. 
3.3     In line with the approved internal audit plan, the following reviews were
completed: 
4. INTERNAL AUDIT- COMPLETED PROJECTS 
Cyber Security
4.1 Cyber Security concerns the protection of computers, servers, mobile devices,
electronic systems, networks, and data from malicious attacks. Cyber security
controls are designed to combat threats against networked systems and
applications, whether those threats originate from inside or outside an
organisation. The Scottish Government in 2020 issued a Cyber Resilience
Framework to all Local Authorities. The Framework includes a self-
assessment tool to assist Local Authorities in improving their cyber resilience
and compliance with a range of legislative, regulatory, policy and audit
requirements regarding cyber security. The audit programme was developed
from this Cyber Resilience Framework and other good practice guidelines.
The impact of a successful cyber attack would immediately affect how
services can be delivered on a day to day basis. The executive summary and
recommendations for this project are given in Appendix 1.
Item 8.
Page 47

Page 48

Social Care and CareFirst System Information Governance Review
4.2    An audit has been undertaken into how information relating to social care
service users is recorded, accessed and kept up to date. The Council uses a
system known as CareFirst to record and manage social care cases for both
adult and children’s services. CareFirst is a long standing widely used
application within the public sector for recording social care data. Most of the
service user data is available on CareFirst, with some data retained
separately either on a Council server or in paper files. 
4.3 The scope of this review considered the findings and recommendations from
an audit undertaken of the CareFirst System within the 2017/18 Audit Plan.
The audit also reviewed the management arrangements for reviewing case
files and access controls of who can view, add, amend or delete information,
recognising that restricted access has to be balanced with a need for prompt
availability of information for those employees who require it for the effective
delivery of services. The executive summary and recommendations for this
project are given in Appendix 2. 
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Moray
Partners in Care 2019 – 2029” 
Internal audit work supports good governance and assists in securing
appropriate systems of internal control. 
(b)  Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications
Audit reports highlight risk implications and contain recommendations for
management to address as a means of mitigating.   
(e) Staffing Implications
No implications directly arising from this report 
(f)   Property
No implications. 
(g)  Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report.  
Page 48

Page 49

(i) Directions      
None arising from this report. 
(j) Consultations      
There have been no direct consultations during the preparation of this
report. 
6. CONCLUSION 
6.1 This report provides Committee with a summary of findings arising from
audit projects completed during the review period. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor 
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/24112022 
Page 49

Page 50

Page 50

Page 51

Appendix 1
AUDIT REPORT 23’011
CYBER SECURITY 
Executive Summary
The annual audit plan for 2022/23 provides for a review to be undertaken into the
Council's arrangements surrounding its Cyber Security. Cyber Security concerns the
protection of computers, servers, mobile devices, electronic systems, networks, and
data from malicious attacks.  
The scope of this audit was to provide a review of systems, practices and an
assessment of the controls in place to protect the Council from a cyber-attack. The
audit also reviewed Information, Communication and Technology (ICT) security
policies and procedures to ensure they are regularly reviewed and promote best
practices. Cyber security controls are designed to combat threats against networked
systems and applications, whether those threats originate from inside or outside an
organisation. A successful cyber-attack would immediately impact the delivery of
services within the Council. 
The Scottish Government in 2020 issued a Cyber Resilience Framework to all Local
Authorities. The Cyber Resilience Framework was developed jointly between the
Scottish Government and the National Cyber Resilience Advisory Board. The
Framework includes a self-assessment tool to assist Local Authorities in improving
their cyber resilience and compliance with a range of legislative, regulatory, policy
and audit requirements regarding cyber security. The audit programme has been
developed from this Cyber Resilience Framework and other good practice
guidelines.  
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS).  
The review has highlighted the following areas for improvement:-   
• The Scottish Government recommends that all Local Authorities should
comply with the Scottish Government Cyber Resilience Framework. The
Service has accepted the requirement to comply with the Framework by
undertaking a self-assessment tool to highlight improvements needed to the
Council’s cyber resilience arrangements. It is appreciated that due to the
pandemic, the ICT Service has been under additional pressure to meet
changes in working practices across all Services. The audit found progress
had been undertaken in completing the self-assessment tool; however, further
action is needed to complete this review. 
• It was found that no formalised incident response plan has been developed in
the event of a successful cyber-attack. A cyber security incident response
plan is a document that gives officers clear instructions on how to respond to
Item 8.
Page 51

Page 52

Appendix 1
a serious security incident, such as a data breach, data leak, ransomware
attack, or loss of sensitive information. Effective security controls would
reduce the risk of a successful cyber-attack, however if the worse did occur,
an incident response plan would ensure clear procedures are followed to limit
the damage and disruption to Services. 
• The Council has policies and guidelines detailing best practices that should be
followed regarding information security and computer use. However, they
have not been reviewed for several years. Policies and Guidelines should be
reviewed and if required updated to include current best practices in
information management, computer use and cyber security arrangements.   
Page 52

Page 53

Appendix 1
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control:  Effective Cyber Security Controls to combat threats against networked systems and applications.
5.01 The ICT Service should progress
with completing the Scottish
Government Cyber Resilience
Framework self-assessment
tool. Any improvement actions
required to Council systems and
procedures should be agreed
with an action plan detailing
recommendations for
implementation.  
High Yes In the latest
response to the
Scottish
Government
Cyber
Assurance
survey (Feb
22), the ICT
Service
reported that it
currently aligns
with the
Progression
Stage of
‘Partial Target’. 
The intention is
to progress to
‘Target’ by the
end of the
current
financial year.
Note there are
dependencies
on the
ICT Team
Leader
(Infrastructure
& Information
Security)
31 March 2023
Page 53

Page 54

Appendix 1
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
implementation
of 5.04 and
5.05 
5.02 ICT policies and guidelines
should be reviewed and if
required updated to include best
practices in information
management, computer use and
cyber security practices.
Medium Yes The Corporate
Information
Security Policy
is currently
under review. 
A revised draft
will be available
by the end of
September. 
The Computer
Use Policy will
be reviewed
thereafter.
ICT Team
Leader
(Infrastructure
& Information
Security)
31 December
2022
5.03 The ICT Business Continuity
Plan should be reviewed and if
required updated to reflect
current cyber resilience
arrangements. 
High Yes This was
acknowledged
in the response
to the latest
Scottish
Government
Cyber
Assurance
survey. 
ICT
Infrastructure
Manager 
31 December
2022
Page 54

Page 55

Appendix 1
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
5.04 Cyber security awareness
training should be provided to
officers of all levels within the
Council. 
Medium Yes A solution to
provide
phishing
simulations and
linked
eLearning
content, to
raise cyber
awareness has
been procured. 
The work to
implement this
solution is in
progress and
discussions
have taken
place with
regard to the
baseline
phishing
campaign
ICT Team
Leader
(Infrastructure
& Information
Security)
31 March 2023
5.05 An Incident Response Plan
should be developed and
thereafter regularly tested
through simulation exercises. 
High Yes This was
acknowledged
in the response
to the latest
Scottish
Government
Cyber
Head of HR,
ICT & OD /
Infrastructure
Manager 
31 December
2022
Page 55

Page 56

Appendix 1
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Assurance
survey.  Work
is also being
progressed via
CMT/SMT with
regard to this,
in light of the
SEPA lessons
learned.
5.06 A review of existing insurance
cover should be carried out to
ensure the level of cover is
appropriate and adequate in
relation to the threat level from
cyber-attack.       
Medium Yes There is cover
in the existing
policy for
reinstatement
of data as well
as cyber
incidents. 
Further
information is
required on the
obligations and
requirements
for cyber
insurance in
future
renewals.
ICT
Infrastructure
Manager
30 September
2022 
Page 56

Page 57

Appendix 2
AUDIT REPORT 23'012 
SOCIAL CARE & CAREFIRST SYSTEM 
INFORMATION GOVERNANCE REVIEW 
Executive Summary
The annual internal audit plan for 2022/23 provides for a review of the CareFirst
system and the various databases used for recording service user information.
CareFirst is the primary database that records and manages social care cases for
Adult, Children and Families Services. CareFirst is a long standing widely used
application within the public sector for recording social care data. Most service user
data is available on CareFirst, but some information is saved separately either on a
council IT server or in paper files due to the lack of a facility within CareFirst to attach
documents and the continued requirement to hold some information in hard copy for
legal reasons.     
The audit reviewed access controls around the management of case files. This
included consideration of who can view, add, amend or delete information,
recognising that restricted access has to be balanced with a need for prompt
availability of information for those employees who require it to deliver services
effectively. Controls in this area are particularly important due to the sensitive nature
of much of the information. In addition, the Council has duties under data protection
regulations, and breaches of these regulations can result in censure and substantial
financial penalties being levied by the Information Commissioner’s Office.    
The audit also considered the findings from a review of the CareFirst System that
was undertaken within the 2017/18 Audit Plan and a check undertaken to evidence
the implementation of these recommendations. 
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS).  
It is appreciated that due to the pandemic, officers have been focused on supporting
service users for the last few years to ensure that essential care continues to be
delivered. The review has highlighted the following areas for consideration:- 
• Information concerning a service user care package is recorded on multiple
databases, i.e., CareFirst, shared drive and paper files. Evaluation should be
undertaken with improving technology, if it is feasible to strengthen case
recording procedures such that all data ultimately can be recorded in a single
file for each service user.   
• Case recording procedures have been developed, however it was noted they
had not been reviewed for several years. In addition, with the imminent
transfer of Children and Families Services to the Moray Integration Joint
Board, there is an opportunity to review working practices and develop
uniform procedures for recording information and reviewing case files.  
Item 8.
Page 57

Page 58

Appendix 2  
• The audit reviewed who can view, add, amend or delete information from the
various databases used for recording service user information. Different
access controls were found between the CareFirst system, Council IT server
and paper files. Consideration should be given to reviewing access controls
for these various databases to ensure consistency in operating arrangements
and that officers can only access information required to undertake duties of
their post. 
Page 58

Page 59

Appendix 2
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Effective Information control systems in operation to protect and secure access to social care data.
. 
5.01 Investigation should be
undertaken to explore the
possibilities of developing a
single case recording system. 
Medium Yes This is a key
requirement for
the
replacement of
CareFirst
System. The
CareFirst
Replacement
Board was
suspended at
the beginning
of the
pandemic.
Health & Social
Care Moray
are currently
developing a
prioritised
delivery plan
for our
Strategic Plan,
Commissioning
Manager
The delivery plan
for Health &
Social Care
Moray’s Strategic
Plan, 
incorporating the
proposed
timetable for
replacement of
the CareFirst, is
scheduled to be
put before the IJB
by 30 November
2022. 
Page 59

Page 60

Appendix 2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Partners In
Care. The
prioritisation of
the
replacement of
CareFirst will
be part of this
process.
5.02 Additional access controls to
the CareFirst System should
be introduced to include time
limited access and more
complex password
combination requirements. 
Medium Yes Time limited
access will be
introduced. It is
not possible to
introduce more
complex
password
combinations
on CareFirst
but this will be
a requirement
for the
replacement of
CareFirst.
Information
Systems
Officer 
31 October 2022 
5.03 A review of access rights to
CareFirst, Shared Drive and
Medium Yes Agreed.
Implementation
Commissioning
Manager
The delivery plan
for Health &
Page 60

Page 61

Appendix 2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Paper Files should be
undertaken with the purpose
that officers should only be
authorised to view case file
information required to
undertake their duties. 
will be
depended on
the
replacement to
the CareFirst
System. 
Social Care
Moray’s Strategic
Plan, 
incorporating the
proposed
timetable for
replacement of
the CareFirst, is
scheduled to be
put before the IJB
by 30 November
2022.
5.04 An officer should record a
clear description within the
CareFirst System to explain
why access is required to a
Restricted Case File. 
Where restricted service user
records are also held within
the shared drive and paper
records, a clear description
should also be maintained
detailing reasons for access.
Low 
Low 
Yes 
Yes
A review of the
management
reports where
access is
required to a
restricted case
file will be
undertaken to
ensure the
reason for
access is
clearly
recorded. A
Commissioning
Manager/
Information
Systems
Officer 
Commissioning
Manager/
Information
Systems
Officer 
31 December
2022 
31 December
2022 
Page 61

Page 62

Appendix 2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation 
report from the
review will be
considered by
the Practice
Governance
Board.
5.05 CareFirst Case Files should
be deleted in accordance with
the Council Document
Retention Policy. Deletion of
case files should only be
actioned after the authority of
a senior manager is obtained. 
Medium Yes Implementation
arrangements
will be reviewed
and agreed by
the Practice
Governance
Board.
Commissioning
Manager/
Information
Systems
Officer 
31 December
2022 
5.06 The deletion of CareFirst 
System files should also
include information held
regarding a service user
within the shared drive and
paper files.
Medium Yes Implementation
arrangements 
will be reviewed
and agreed by
the Practice
Governance
Board.
Commissioning
Manager 
31 December
2022 
5.07 The re-introduction of regular
reviews of case files should
be undertaken by Managers
Medium Yes Regular
reviews of case
files will be
Head of
Community
Care/  Head
Children &
31 October 2022
Page 62

Page 63

Appendix 2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
within Adult, Children and
Families Services.   
undertaken by
managers. 
Families &
Criminal
Justice
5.08 Case recording procedures
should be updated for Adult,
Children and Families
Services. 
Medium Yes Adult Services
have reviewed
the Case
Recording
Procedure and
are developing
a
complementary
Records
Management
Procedure. The
revised Case
Recording
Procedure is
currently at final
draft stage. 
Children and
Families
Services are
also intending
to update their
Commissioning
Manager 
Quality 
Improvement &
Policy
Manager   
31 December      
2022 
31 January 2023     
Page 63

Page 64

Appendix 2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Case
Recording
Procedure.
5.09 A review should be undertaken of
the security of paper records held
within the Community Care
Finance Offices to ensure service
user information can only be
viewed by authorised officers. 
Medium Yes This has
recently taken
place, a number
of actions from
the review have
been
completed.
New office
equipment is
currently being
purchased e.g.
new lockable
filing cabinets
and the
Community
Care Finance
Officer is
liaising with
Health & Safety
Section with a
view to
identifying any
further security
Community
Care Finance
Officer
Completed   
Page 64

Page 65

Appendix 2 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
measures for
both the office
and the
building.
Page 65

Page 66

Page 66

Page 67

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 24 NOVEMBER 2022 
SUBJECT:  DIRECTIONS MONITORING REPORT 
BY:  CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1. To inform the Committee of the issued Directions of the Moray Integration Joint
Board (MIJB) for the period 1 April to 30 September 2022. 
2. RECOMMENDATION 
2.1. It is recommended that the Audit, Performance and Risk Committee
consider and note the Directions issues in the first six months of
2022/23. 
3. BACKGROUND 
3.1 The Public Bodies (Joint Working) (Scotland) Act 2014 (the Act) established the
legal framework for integrating health and social care in Scotland. The Act
required Integration Authorities to develop a Strategic Plan for the integrated
functions and budgets delegated by the health board and local authority.   
3.2 In accordance with Sections 26-28 of the Act, MIJB has in place a mechanism
to action its Strategic Plan which takes the form of binding Directions to one or
both of the Partners. Directions are the means by which the MIJB informs NHS
Grampian and Moray Council of what is to be delivered using the integrated
budget in order to achieve the strategic aims outlined in its Strategic Plan. A
Direction must be issued in respect of every function that has been delegated
to the MIJB. Directions are an obligatory legal mechanism. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 At the MIJB meeting on 31 March 2022, the Directions policy and procedures
were approved (para 17 of the minute refers).  This was to enhance
governance, transparency and accountability between the MIJB and its Partner
organisations, NHS Grampian and Moray Council through a clear framework for
the setting and reviewing of Directions and to confirm adequate governance
arrangements. 
Item 9.
Page 67

Page 68

4.2  As part of the approved procedures, The Audit, Performance and Risk
Committee are to review all live Directions on a six monthly basis for assurance
of delivery and compliance through an update report.  With any resulting
concerns being escalated to the MIJB at the first available opportunity.     
4.3 APPENDIX 1 details the Directions approved during the period 1 April to 30
September 2022, for consideration.   
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Commissioning Plan 2019 – 2029 ‘Partners
in Care’
This report is consistent with the objectives of the Strategic Plan and
includes Directions detailed to the partners of the MIJB.  
(b) Policy and Legal
The MIJB is, in terms of Section 26 to 28 of the Public Bodies (Joint
Working) (Scotland) Act 2014 required to direct NHS Grampian and
Moray Council to deliver services to support the delivery of the Strategic
Plan is as far as the functions that have been formally delegated. 
(c) Financial implications
None arising directly from this report. 
(d) Risk Implications and Mitigation
The delivery of the Strategic Plan is put at risk should appropriate
Directions not be issued. The quality of the Directions are also a factor in
ensuring implementation as intended. Close monitoring of Directions and
scrutiny by Committee provides reasonable assurance that Directions
are being carried out as intended. 
(e) Staffing Implications
None arising directly from this report. 
(f) Property
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
None arising directly from this report. 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report. 
(i) Directions 
None arising directly from this report. 
(j) Consultations
The Chief Officer and Corporate Manager of the MIJB have been
consulted for comment where appropriate. 
Page 68

Page 69

6. CONCLUSION 
6.1 The Audit, Performance and Risk Committee are asked to consider and
note the report content and Directions included in APPENDIX 1. 
Author of Report: Deborah O’Shea, Interim Chief Financial Officer
Background Papers:  with author
Ref: 
Page 69

Page 70

Page 70

Page 71

MIJB Register of Directions             APPENDIX 1
Issue to Agreed by IJB
on
Effective from Title of Direction and
Reference
Functions covered by Direction Link to direction 
MC 30 June 2022 31 March 2022 2022/21 Core Functions
Ref: 20220630MC01
All functions listed in Annex 1, Part 1 of the
Moray Health and Social Care Integration
Scheme and all functions listed in Annex 2,
Part 1 of the Moray Health and Social Care
Integration Scheme. 
SPMAN-
1236605834-1393 
GHB 30 June 2022 31 March 2022 2022/21 Core Functions
Ref: 20220630GHB01
All functions listed in Annex 1, Part 1 of the
Moray Health and Social Care Integration
Scheme and all functions listed in Annex 2,
Part 1 of the Moray Health and Social Care
Integration Scheme. 
SPMAN-
1236605834-1394 
MC 29 Sept 2022 01 April 2022 MIJB Updated Budget
Position
Ref: 20220401MC02 
All functions listed in Annex 1, Part 1 of the
Moray Health and Social Care Integration
Scheme and all functions listed in Annex 2,
Part 1 of the Moray Health and Social Care
Integration Scheme. 
SPMAN-
1236605834-1436 
GHB 29 Sept 2022 01 April 2022 MIJB Updated Budget
Position
Ref: 20220401GHB02 
All functions listed in Annex 1, Part 1 of the
Moray Health and Social Care Integration
Scheme and all functions listed in Annex 2,
Part 1 of the Moray Health and Social Care
Integration Scheme. 
SPMAN-
1236605834-1435 
Item 9.
Page 71

Page 72

Page 72