Audit, Performance and Risk Committee 
Thursday, 30 June 2022 
remote locations via video conference 
NOTICE IS HEREBY GIVEN that a Meeting of the Audit, Performance and Risk
Committee, remote locations via video conference,  on Thursday, 30 June 2022
at 14:00 to consider the business noted below. 
AGENDA 
1. Welcome and Apologies 
2. Declaration of Member's Interests 
3. Minute of Meeting of 31 March 2022 3 - 6
4. Action Log of Meeting of 31 March 2022 7 - 8
5. Quarter 4 Performance Report 9 - 52
6. Internal Audit Completed Projects 53 - 60
7. Strategic Risk Register Report 61 - 92
8. Internal Audit Annual Report 2021-22 93 - 102 
Page 1

Page 2

MORAY INTEGRATION JOINT BOARD 
SEDERUNT 
Mr Sandy Riddell  (Chair)  
Mr Derick Murray  (Voting Member)
Councillor John Divers  (Voting Member)
Councillor Scott Lawrence  (Voting Member)
Mr Sean Coady  (Member)
Mr Steven Lindsay  (Member)
Ms Jane Mackie  (Member)
Simon Bokor-Ingram  (Member)
Jeanette Netherwood  (Member)
Mr Neil Strachan  (Member)   
Clerk Name: Tracey Sutherland
Clerk Telephone: 07971 879268
Clerk Email: committee.services@moray.gov.uk 
Page 2

Page 3

MINUTE OF MEETING OF THE AUDIT, PERFORMANCE AND RISK COMMITTEE 
Thursday, 31 March 2022 
To be held remotely in various locations, 
PRESENT 
Ms Tracey Abdy, Simon Bokor-Ingram, Mr Steven Lindsay, Ms Jane Mackie, Mr Derick
Murray, Mr Sandy Riddell 
APOLOGIES 
Councillor Frank Brown, Mr Sean Coady, Councillor Theresa Coull, Mr Neil Strachan 
IN ATTENDANCE 
Also in attendance were Corporate Manager, Internal Audit Manager and Tracey
Sutherland, Committee Services Officer.  
Maggie Bruce, Audit Scotland was also in attendance.   
1.         Welcome and Apologies 
Sandy Riddell as Chair of the meeting welcomed everyone and apologies were noted.  
2.         Declaration of Member's Interests 
There were no declarations of Members' Interest in respect of any item on the agenda.  
3.         Thanks 
The Committee joined the Chair in thanking Tracey Abdy, Chief Financial Officer, for
her hard work, assistance and guidance during her time as Chief Financial
Officer.  Ms Abdy leaves her post on 31 March 2022.  
4.         Minute of Meeting of 6 December 2021 
Item 3.
Page 3

Page 4

The minute of the meeting of 6 December 2021 was submitted and approved.  
5.         Action Log of Meeting of 6 December 2021 
The Action Log of the meeting dated 6 December 2021 was considered and updated
accordingly.  
6.         Performance Report - Quarter 3 
A report by the Chief Financial Officer updated the Audit, Performance and Risk
Committee on performance as at Quarter 3 (October to December 2021).  
The Corporate Manager updated the Committee to confirm that for future reports,
waiting times at Accident and Emergency will be included in the figures provided. 
The Chair sought information on the actions being taken within NHS Grampian and
Moray Council to help relieve the pressures on staff within the organisations be
included in future reports.  
Following further consideration, in which Officers answered questions regarding D2A,
mental health services and Social Care staff recruitment and the pressures on staff
across the organisation, the Committee agreed to note:  
i) the performance of local indicators for Quarter 3 (October to December 2021)
as presented in the Performance Report at Appendix 1;    
ii) the analysis of the local indicators that have been highlighted and actions being
undertaken to address performance that is outside of acceptable target ranges
as detailed in Appendix 1; and    
iii) the introduction of management dashboards using the Pentana Risk software
to enable managers to monitor performance (an example is at Appendix 2). 
7.         Internal Audit - Completed Projects 
A report by the Chief Internal Auditor provided an update on audit work completed since
the last meeting of the Committee.  
Following consideration the Committee agreed to note this audit update.  
8.         Strategic Risk Register 
A report by the Chief Officer provided an overview of the current strategic risks, along
with a summary of actions which are in place to mitigate those risks, updated in March
2022.  
Following consideration the Committee agreed to:  
i) note the updated Strategic Risk Register included in appendix 1; and    
ii) note the Strategic Risk Register will be further refined to align with the
transformation and redesign plans as they evolve.
Page 4

Page 5

9.         Internal Audit Plan 2022-23 
A report by the Chief Internal Auditor provided the Committee with information on the
proposed internal audit coverage for the 2022/23 financial year.  
Following consideration the Committee agreed the proposed audit coverage.  
10.         Civil Contingencies Resilience Standards Report 
A report by the Corporate Manager informed the Committee of progress against NHS
standards and provided an overview of the work of the Health and Social Care Moray
(HSCM) Civil Contingencies Group.  
Following consideration the Committee agreed:  
i) to note progress to date and contents of this report alongside the HSCM Civil
Contingencies Group Action Plan (Appendix 1); and    
ii) request that an annual assurance report to this Committee from the HSCM Civil
Contingencies Group. 
11.         External Review of Commissioned Services 
A report by the Chief Officer informed the Committee of the outcome of an external
review of the Health and Social Care (HSCM) commissioning service.  
Following consideration the Committee agreed:  
i) to request that an external review is commissioned through an external audit
organisation as a paid for commission.    
ii) to note the findings of the external review included in Appendix 1. 
Page 5

Page 6

Page 6

Page 7

MEETING OF MORAY INTEGRATION JOINT BOARD 
AUDIT, PERFORMANCE AND RISK COMMITTEE 
THURSDAY 31 MARCH 2022 
ACTION LOG 
Item
No.
Title of Report Action Required Due Date Action By Update for 30/6/22
1.  Action Log of
Meeting dated 27
August 2020
Payment Verification Assurance Update –
once through appropriate NHSG Governance
route. 
June 2022 Sean Coady Payment verification
has not yet resumed
– update in CO report
30/6/22 
2.  G-OPES Reporting proposals from G-OPES to be
considered by IJB.
June 2022 CO HSCM Included in risk
register report
3.  Performance
Report – Quarter
3
Information on actions being taken by NHS
Grampian and Moray Council to help relieve
pressures on staff within the organisations to
be included in future reports.
June 2022 Jeanette
Netherwood
Noted
Both Moray Council
and NHS Grampian
have dedicated
workstreams that
cover all our
employed staff and
are managed by each
organisation.  
4.  Civil
Contingencies
Annual Assurance Report from HSCM Civil
Contingencies Group
March 2023 Jeanette
Netherwood
scheduled
Item 4.
Page 7

Page 8

Item
No.
Title of Report Action Required Due Date Action By Update for 30/6/22
Resilience
Standards Report
5.  External Review
of Commissioned
Services
External Review to be commissioned. Aug 2022 CO HSCM In process of
procurement.  
Report scheduled for
APR in August 
Page 8

Page 9

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 30 JUNE 2022 
SUBJECT: QUARTER 4 (JANUARY TO MARCH 2022) PERFORMANCE
REPORT 
BY:  CORPORATE MANAGER 
1. REASON FOR REPORT 
1.1 To update the Audit, Performance and Risk (APR) Committee on performance
as at Quarter 4 (January to March 2022). 
2. RECOMMENDATION 
2.1 It is recommended that the APR Committee consider and note: 
i) the performance of local indicators for Quarter 4 (January to
March 2022) as presented in the Performance Report at
APPENDIX 1; 
ii) the analysis of the local indicators that have been highlighted and
actions being undertaken to address performance that is outside
of acceptable target ranges as detailed in APPENDIX 1; 
iii) the performance of the indicators reported to the Ministerial
Strategic Group (MSG) for Health and Community Care (latest
published data) as presented at APPENDIX 2; and 
iv) the performance of the Health and Social Care Integration: core
indicators for the reporting year 2021/22 as presented at
APPENDIX 3.  
3. BACKGROUND 
3.1   The purpose of this report is to ensure the Moray Integration Joint Board
(MIJB) fulfils its ongoing responsibility to ensure effective monitoring and
reporting on the delivery of services and on the programme of work as set out
in its Strategic Plan. 
3.2   APPENDIX 1 identifies local indicators for the MIJB and the functions
delegated by NHS Grampian and Moray Council, to allow wider scrutiny by
the Board.
Item 5.
Page 9

Page 10

3.3 APPENDIX 2 allows the AP&R committee to scrutinise the performance of
HSCM against the six indicators used by the MSG to monitor progress of the
MIJB ‘to realise the full potential of integration and ensure that the people of
Scotland get the right support, in the right place, at the right time, no matter
their care needs.’ 
3.4   APPENDIX 3 is included for the first time to allow the AP&R committee to
scrutinise performance against the national indicators (Health and Social Care
Integration: core indicators) that Integration Authorities are required to use to
measure progress towards the National Health and Wellbeing Outcomes. The
latest available data are for the year 2019/20 for the ten outcome indicators
and 2020/21 for the data indicators; the 2021/22 data are expected to be
published in September 2022. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 Local Indicators are assessed on their performance via a common
performance monitoring Red, Amber, and Green (RAG) traffic light rating
system. 
RAG scoring based on the following criteria:
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within agreed
tolerance.
RED If Moray is performing worse than target by more than agreed
tolerance. 
4.2 The detailed performance report for quarter 4 is attached in APPENDIX 1.   
Summary
4.3 Performance within Health and Social Care Moray (HSCM) as demonstrated
by the agreed indicators up to the end of quarter 4 of the financial year
2021/22 is showing as variable. Three of the indicators are presenting as
green, two are amber and five are red. This represents a reduced
performance compared to both quarters 2 and 3 and is a reflection of the
significant additional pressure placed on the service during quarter 4. 
4.4 Figure 1 provides a summary and the historical trend by indicator since
quarter 3 of year 2020/2021. A summary of performance for each of the 6
reporting categories is provided below. Two of these areas are presenting as
green, while one is Amber and the other three are red. 
EMERGENCY DEPARTMENT - GREEN
There has been no appreciable change in the rate per 1,000 this quarter from
20.0 to 20.2, meeting the target but still well above the number presenting at
the same period last year. However, the rate in February had reduced to 18.1
and the figure for March reversed the trend of the previous 4 months. 
DELAYED DISCHARGES – RED   
The number of delays at the March snapshot was 46 (up from 39 at the end of
the previous quarter), remaining well above the revised target of 10. The
number of bed days lost due to delayed discharges was 1294 (up from 1142). 
Page 10

Page 11

EMERGENCY ADMISSIONS – RED  
There continues to be a steady increase each month in the rate of emergency
occupied bed days for over 65s, as noted in previous reports. Since the end of
quarter 4 last year the rate has increased from 1,773 to 2,140, exceeding the
target of 2,037 per 1,000 population. The emergency admission rate per 1000
population for over 65s has reduced from 187.2 to 183 during quarter 4 and
remains AMBER, while the number of people over 65 admitted to hospital in
an emergency also reduced from 126.3 to 125.2 over the same period, and
also remains AMBER. 
HOSPITAL RE-ADMISSIONS - GREEN
Both indicators in this barometer remain green having continued the
improvements noted in the previous 2 quarters. 28-day re-admissions are
8.0% and 7-day re-admissions are at 3.4%. 
MENTAL HEALTH – RED  
After achieving 100% for the 6 months from December 2020 through to June
2021 there has been a further reduction in performance during quarter 4 with
33.3% of patients being referred within 18 week, compared to 67% last
quarter. 
STAFF MANAGEMENT – RED   
NHS employed staff sickness levels have reduced again to 4.7% from 5.5%,
but remain above the target of 4%. Council employed staff sickness was
8.05% last quarter, remaining above the 4% target. Unfortunately, sickness
within the Moray Council Human Resources team who deal with information
management has meant the data for quarter 4 have not yet been published. 
Figure 1 – Performance Summary 
Q4 2021 Q1 2122 Q2 2122 Q3 2122 Q4 2122 New Target Previous Target
Jan-Mar Apr-Jun Jul-Sep Oct-Dec Jan-Mar (from Q1 2122) (from Q1 2021 or earlier)
AE Accident and Emergency
AE-01 A&E Attendance rate per 1000 population (All Ages) 17.8 23.5 21.7 20.0 20.2 no change 21.7 G‚
DD Delayed Discharges
DD-01* Number of delayed discharges (including code 9) at census point 17 20 30 39 46 no change 10 R
DD-02
Number of bed days occupied by delayed discharges (including code 9) at census
point 496 592 784 1142 1294 no change 304 R
EA Emergency Admissions
EA-01 Rate of emergency occupied bed days for over 65s per 1000 population 1773 1859 1934 2045 2140 2037 2107 R
EA-02 Emergency admission rate per 1000 population for over 65s 174.8 185.9 190.4 187.2 183 179.9 179.8 A
EA-03
Number of people over 65 years admitted as an emergency in the previous 12
months per 1000 population 119.3 124.1 126.7 126.3 125.2 123.4 124.6 A
HR Hospital Readmissions
HR-01 % Emergency readmissions to hospital within 7 days of discharge 5.0% 4.4% 4.1% 3.5% 3.4% no change 4.2% G‚
HR-02 % Emergency readmissions to hospital within 28 days of discharge 9.8% 9.2% 8.4% 8.4% 8.0% no change 8.4% G‚
MH Mental Health
MH-01
% of patients commencing Psychological Therapy Treatment within 18 weeks of
referral 100% 100% 100% 67% 33.0% no change 90% R
SM Staff Management
SM-01 NHS Sickness Absence (% of hours lost) 3.1% 4.2% 6.0% 5.5% 4.7% no change 4% R                                                             
Health and Social Care Moray Performance Report                                          
Code Barometer (Indicator) RAG
Page 11

Page 12

AREAS NOT MEETING TARGETS  
Delayed Discharge
4.5 As predicted in the previous report the two indicators shown under the
Delayed Discharge heading (DD-01 and DD-02) continue to be red and
remain well above the new targets set at the end of quarter 3 of 2020/21. The
reasons for the above target levels remain the same; there as an additional
demand from the increase in COVID-19 cases linked to the Omicron variant
during the first few weeks of the quarter, along with the previously reported
increased frailty and more complex needs of patients. Staff absences due to
sickness (COVID-19, self-isolation and non-COVID-19 related illnesses)
remained high for Council staff during quarter 4, and lower, but above target,
for NHS staff. External providers of care within Moray were also experiencing
similar high levels of staff as were care homes. This significantly limited the
ability to meet the demand for care at home. Although the availability of beds
in care homes increased during quarter 4 there continued to be insufficient
beds available to meet demand. 
4.6 At the end of quarter 4 four of the 14 care homes were at ‘Red’ status for
COVID-19 and unable to receive residents, and the remaining 10 were
‘Green’. This represents a turnaround from the situation reported at the end of
last quarters when 7 care homes were ‘Red’ and 7 ‘Amber’. This was caused
by the impact of COVID and a diarrhoea and vomiting virus on staffing levels
and impact of measures implemented to reduce the spread to those in the
home. 
4.7 The measures outlined in previous report have had some effect in reducing
the number of delayed discharges. However, the number of people delayed
each day on average was over 40 during quarter 4, and the indications are
that it is reducing very slowly (Figure 1). 
Figure 1: Average Number of Delayed Discharge Patients in Moray per Week 
4.8 Figure 1 indicates how much higher the numbers of patients are each day
who face a delayed discharge from hospital compared to last winter,
illustrating the scale of the task faced by health and social care teams. While
the trend is showing a reduction in the number of people affected it is a very
gradual reduction and represents a significant loss of bed–capacity for other
medical procedures, for example, and an additional unplanned burden on
hospital and social care staff. There are considerable efforts being made
across the system to move people to the most appropriate place to meet their
needs as quickly as possible, but during quarter 4 there was restricted flow
Page 12

Page 13

due to the impacts being felt across all teams due to staff absences caused by
COVID-19. 
Emergency Admissions 
4.9 Emergency Admission rates for the over 65s (EA-02) have reduced during
quarter 4, continuing the trend observed in the previous quarter. Note that the
rate of 183 per 1,000 population remains above the target based on the 2019
average of 179.9 per 1,000 population. Similarly, the number of people
admitted as an emergency over 65 years old (EA-03) has followed a similar
trend. This indicator was showing a consistent downward trend but between
February and July 2021, the trend reversed and increased rapidly. Since
August 2021 the number of emergency admissions for this age group levelled-
off and in quarter 4 the rate reduced to 125.2 per 1,000 population, just above
the target of 123.4 per 1,000 population (also based on the 2019 average).
Note that the Emergency Occupied Bed Days for over 65s (EA-01) has been
increasing steadily since the start of 2021 and continued to increase each
month during quarter 4 reaching a rate of 2,140 bed-days per 1,000
population, exceeding the target of 2,037 per 1,000 population. 
4.10 While the rate per 1,000 population presenting at ED is meeting the required
performance level the proportion of patients seen within the 4-hour target time
has dropped significantly since May 2021 (Figure 2). Prior to March 2020 over
95% of attendees at ED were seen within 4 hours, generally reducing to 90%
in the winter months. Since May 2021 this rate has dropped to around 80%,
and in January 2022 (the latest available data) the rate was 80.3%.
Performance is below target and has deteriorated during 2021/22. 
Figure 2 – Percentage of patients seen within 4 hours (all ages) – (PHS, A&E Datamart) 
Mental Health 
4.11 There was a reduction in the percentage of patients receiving psychological
therapy treatment within 18 weeks (MH-01) for the second successive quarter
from 67% to 33% at the end of March 2022. This reduction is in contrast to the
first 6 months of 2021 when the percentage meeting the 18-week timescale
was consistently 100%. This is due to capacity issues in the team and an
increase in referrals. 
4.12 For information, a workshop will be held on 29 June 2022 for all staff
delivering psychological therapies in Moray to look at how the position can be
improved. 
Staff Management
Page 13

Page 14

4.13 The number of cases of COVID-19 being reported across Scotland peaked in
mid-March 2022 and by the end of quarter 4 the number for Moray was 704
cases (equivalent to 737 per 100,000 population), virtually identical to the
national rate of 742 per 100,000 population. 
4.14 At the end of quarter 4 Moray vaccination rates for all residents aged 12 years
old and over were less than the Scottish average rates for 1st and 2nd dose
vaccinations at 89.6% and 85.2% respectively (compared to 93.3% and
87.3% for Scotland)1. In Moray 72.8% of the population have had a third
vaccination, almost identical to the national rate of 72.9%. There was a
marked rise in hospital admissions in Scotland during the middle part of
quarter 4 significantly higher than the previous spikes observed during the
pandemic. Although the numbers started to reduce during the final 2 weeks of
the quarter the figure of 235 admissions per day remains high (Figure 3).
Admissions to ICU, however, remained at relatively low levels with the end of
quarter 7-day average of 6.43 being almost half the figure of 11.86 recorded in
September 2021 and almost one-third of the 16.43 recorded in January 2021.2 
Figure 3 - Hospital admissions 1 April 2020 to 31 March 2022 (PHS Data) 
4.15 The average absence due to sickness for all Moray Council staff since May
2020 was 6.9% at the end of quarter 4.  This is just above the Scottish
average of 6.1% for the same period and above the pre-pandemic levels. The
rising level of absence reported in the previous 2 quarters continued into
quarter 4 reaching 10.5%. Over the same period NHS staff absences due to
sickness reduced from 5.5% in quarter 3 to 4.7%. 
4.16 Although the quarter 4 absence percentage for Moray Council employed
Health and Social Care staff is not available, the locally collected data for
Provider Services provides an illustration of the magnitude of the difficulties
facing managers (Figure 4). Since the second week in March 2022 there was
a steady reduction in absences from over 17% to 7.25% at the end of April.
Since then, the percentage has risen steadily each week and by 1 June 2022
(admittedly outside the scope of this report) it had risen to 11.6%. 
1 https://coronavirus.data.gov.uk/details/vaccinations?areaType=nation&areaName=Scotland Data to
31 March 2022.
2 Data for this measure is not available for individual local authorities.
Page 14

Page 15

Figure 4: Provider Services staff absence rate since 26 January 2022 (service collated
data) 
4.17 The recruitment cell continues to give excellent support to Provider Services
working with locality managers to highlight the team and their role. Not only is
there a steady supply of recruits to the care teams the cell also is taking some
of the pressure off the workload Provider Services managers, for instance by
carrying out interviews of potential recruits, developing locality specific
adverts, promoting the care profession and networking with Moray College
UHI to access training. The Recruitment cell is creating their team plan for the
remainder of the year and will be focussing on localities with their next
recruitment drive to target areas where there are low numbers of Social Care
Assistants (SCAs). 
4.18 Due to projects and other commitments Care Officers have not been able to
provide the usual level of support to SCAs and it has not been possible to
backfill these posts. Action is being taken by Care at Home which should
rectify this situation. 
4.19 The profile of the role of SCAs has been raised through Social Media showing
possible career progression paths and also to show the high regard the SCAs
are held in by the service users. Links are included to the videos placed on
social media, including a video made by the DYW with support from school
pupils: 
• https://m.facebook.com/watch/?v=1368388736919899&_rdr 
• https://www.facebook.com/watch/?v=379061773356751 
• https://www.youtube.com/watch?v=vJgpPg9TaPI   
4.20 Managers continue to be faced with daily challenges to find staff to allocate to
rosters and to maintain the delivery of their services, and to prioritise the
services being provided. For example, within both Community nursing teams
and community hospitals all teams are supporting each other, where possible,
to cover sickness and vacancies.  There is a national shortage of trained
District Nurses and this is reflected in the Moray workforce.  However, with the
agreement of City and Shire colleagues we are offering 3 trainee opportunities
this year, as opposed to the 2 we normally offer.  Although it will take 2 years
to reap the full benefits at least it is someway in addressing the shortfall within
this workforce. Recruitment of staff continues to be challenging but we have
Page 15

Page 16

opportunities and areas where we can support New Graduate Nurses and by
September, hope to have at least 3 in post within both community nursing and
community hospitals. 
4.21 There are 2 District Nurse Team leaders seconded until December and March
which has a domino effect and as a result there are 3 other District nurses
seconded in to cover these roles.  This comes with its own challenges of
trying to work creatively to ensure safe working and safe patient care with
limited resources. 
4.22 The HSCM team has been supported since January 2022 by Moray Council
HR to identify ways of redeploying and recruiting additional staff to provide
adequate cover to meet demand. An internal request for support for Council
staff to redeploy to support HSCM had limited impact. Of the dozen or
enquiries, only 1 person matched with administration work; nothing further
came of the exercise as the key requirement was the need for caring work
and volunteers were not willing to undertake such tasks. 
4.23 The other support provided by HR included training, recruitment, and
retention. The Moray Council Social Work Training Team were ready to
respond as required, matching needs of recruits with training requirements as
well as arranging and delivering the training. An open advert for Social Care
Assistants (SCAs) was successful in encouraging people to apply for posts. In
March there were 4 or 5 interviews a week in response to the advert with
recruits coming from other care providers as well as from outwith the care
sector. Since then, there has been a continuing stream of applicants. 
4.24 Additionally, the HR team has worked with local partners to identify other
ways of recruiting staff into the HSCM team. The Department for Work and
Pensions (DWP) now promote current vacancies to all work coaches in Moray
to raise the profile of care work. Moreover, an HSCM manager was the guest
speaker at the end of January at a meeting with work coaches to promote the
vacancies, explore the possibility of a Sector Base Academy initiative and to
review our work experience agreement with the DWP. Developing the Young
Workforce Moray have bene given access to promotional equipment and are
working with the service on a campaign for encouraging young people into the
care sector. 
4.25 Job adverts have been placed with the local military organisations to
encourage spouses and partners to consider care roles. Managers have
attended job fairs in Inverness and Buckie but these were of limited value. 
4.26 In order to understand why people leave the service there have been
discussions with a small group of SCAs who were able to air their concerns.
Exit interview forms do not provide much information other than the common
theme of poor communication. The report last quarter highlighted the
reduction on working hours as people were looking for ways to balance their
work and domestic commitments. This has continued, and requests are
generally supported as there is a risk of losing the employee altogether and it
considered to be a better option to retain staff, albeit working fewer hours, to
have some availability to cover shifts. However, a more planned approach is
in place as it is not possible to cover the number of hours required to meet the
demand if there is an increased reliance on those on zero hours contracts
Page 16

Page 17

rather than those with confirmed contractual hours. Requests for reducing
hours from staff are now closely managed and there have been discussions
with unions about the approach being taken. 
4.27 Burn-out amongst staff, supervisors and managers caused by continuing high
levels of absence and the constant crisis management to cover shifts on a
daily basis threatens the long-term ability of the service to meet demand. The
report on Unmet Need in Health and Social Care Moray, approved by the
Moray Integration Joint Board at their meeting held on 31 March 2022 (item 9
of the minutes refers) noted the conclusion of a study published in November
2021 that found COVID-19 stress was a significant independent predictor of a
decline in the mental wellbeing of health and social staff in Scotland.3
Furthermore, pressure on the system remains high with levels of unmet need
and number of people experiencing delayed discharge above pre-pandemic
levels. Demand is likely to increase as the population of Moray continues to
age, as reported to the Moray Integration Joint Board Clinical and Care
Governance Committee at the meeting held on 26 May 2022 (agenda Item 9). 
4.28 Due to the continued and increasing pressures on staffing across HSCM
focussed effort is being put into collation and identification of potential staffing
pressures across HSCM services, especially when there are high levels of
community transmission of Covid.  The key staffing information regarding
annual leave, sickness absences, covid related absences and vacancies in
order to obtain the necessary management information to inform decisions
regarding the allocation of staff resources.  This was instigated in January
2022 and is being overseen by SMT.   A short daily response huddle of
service managers has been instigated and meets at 9:00am weekdays to
review immediate pressures and look for solutions or provision of support
where possible. 
MINISTERIAL STRATEGIC GROUP (MSG) FOR HEALTH AND
COMMUNITY CARE
4.29 The six MSG indicators provide an indication of the progress being made to
realise the full potential of integration and the data are collated and circulated
by Public Health Scotland (APPENDIX 2). Performance can be summarised
as follows, but the advice is to treat with caution, as the response to the
pandemic and the unusual nature of the past 2 years have had an incalculable
impact on integration activities. 
4.30 Emergency Admissions There were 1,907 emergency admissions in quarter
4, the lowest quarterly figure during 2021/22. The average number of
admissions in each quarter of 2021/22 was 2,054, which compares with pre-
pandemic averages. Numbers of emergency admissions dropped by about
25% during the Quarter 1 2020/21, which was the first quarter after the
lockdown measure were introduced, but since then the monthly figure has
been between 600-700 (approximately). Performance can be summarised as
stable. There were 1,448 admissions from the Emergency Department (ED) in
quarter 4, down from 1,596 in quarter 3. Prior to the Covid-19 pandemic there 
3 Cogan, N., Kennedy, C., Beck, Z., McInnes, L., MacIntyre, G., Morton, L., Kolacz, J., & Tanner, G.
(2021). ENACT project: understanding the risk and protective factors for the mental wellbeing of
health and social care workers in Scotland: adapting to the challenges and lessons learned. Poster
session presented at NHS Research Scotland Mental Health Annual Scientific Meeting 2021, Online,
United Kingdom.
Page 17

Page 18

were around 1,100 admissions from ED each quarter, but this figure has now
been consistently around 1,500 during 2021/22. Performance appears to have
stabilised, but at a higher level than before the pandemic. 
4.31 Unscheduled hospital bed days - The number of unscheduled hospital days
for acute specialities (all ages) was 11,972 in quarter 4, down from 13,191 in
quarter 3, and 25% lower than the highest recorded figure of 16,013 bed days
in quarter 1 2018/19. The quarter 4 figures were lower than usual due to the
untypically low number of unscheduled bed days in January 2022 (3,030) and
if the March figure (4,688) is repeated in coming months then next quarter is
likely to be back to more typical. The reason for the reduced number in
January is not clear but it did coincide with the rise in the number of cases of
the Omicron variant. Performance is probably stable, albeit at a lower level
than before the pandemic. 
4.32 A&E (now known as ED) attendance - The graph of ED attendance
numbers mirrors the various phases of the COVID-19 outbreak. After the
initial lockdown in March 2020 the number of patients presenting at the ED
roughly halved from their typical figure of over 2,000 per month. Numbers
were back at typical levels over the summer of 2021, reducing to 1,900 per
month in the autumn. But as the Omicron variant arrived in Moray ED
attendance reduced in February 2022. Consequently, for quarter 4 there were
4,903 attendees at ED, 900 fewer than in quarter 3. Long-term performance
won’t be clear for a few quarters, but there are indications that if the March
2022 monthly figure is repeated, then performance has reduced from pre-
pandemic levels. However, more data are required before this assessment
can be made with any certainty. 
4.33 On the other hand, it is clear that the 4-hour ED waiting time target is not
being met, as described at paragraph 4.10 previously. 
4.34 Delayed Discharges - The number of delayed discharge bed-days also
mirrors the peaks and troughs of the pandemic, but with 1,201 bed-days
recorded in January 2022 (the latest available data) performance is similar to
pre-pandemic levels. 
4.35 End of life care - In 2020/21 (the latest available data) 91.7% of residents
spent the last 6 months of their life in a community setting4, 5% were in a large
hospital, and 3.2% were in a community hospital. The proportion in a
community setting has increased gradually from 88.8% in 2013/14 while those
in a large hospital has reduced from 7% over the same period. Community
hospital figures have remained close to 4%. 
4.36 The balance of care across institutional and community services - The
most recent published data relates to 2019/20 which show that the majority
(98.1%) of people are able to live unsupported in their own homes. 1.1% are
supported in their homes, 0.5% in care homes and the remainder in hospital,
community hospitals or hospice/palliative care. The breakdown between these
settings has remained virtually unchanged since 2013/14. 
4 Community includes care home residents as well as those living in their own home.
Page 18

Page 19

NATIONAL HEALTH AND SOCIAL CARE INTEGRATION; CORE
INDICATORS
4.37 The core indicators have been developed to measure progress that IJBs are
making towards meeting the National Health and Wellbeing Outcomes and
are being reported to this committee for the first time. The figures are
published annually for the data indicators and biennially for the ten outcome
indicators (APPENDIX 3). The 2021/22 figures for the outcome indicators
have recently become available, but not yet for the data indicators. However,
the 2020/21 data indicators are included for information. 
4.38 In 2021/22 performance across Scotland reduced for all 9 of the reported
outcome indicators compared to 2019/20. Moray mirrored the national
performance apart from recording a small improvement in the percentage of
carers who feel supported to continue in their caring role. However, it should
be noted that the sampling method used for data gathering means the results
have a degree of uncertainty, so changes or differences of 1% or 2% are likely
to be statistically insignificant. 
4.39 The comparison for each indicator is as follows: 
• Exceeding or equalling Scottish average:
o Percentage of adults able to look after their health very well or quite
well (Moray 93%; Scotland 91%) 
o Percentage of adults supported at home who agreed they are
supported to live as independently as possible (Moray 79%;
Scotland 79%), and
o Percentage of carers who feel supported to continue in their caring
role (Moray 32%; Scotland 30%), 
• Below Scottish average:
o Percentage of adults supported at home who agreed that they had
a say in how their help, care or support was provided (Scotland
71%; Moray 70%)
o Percentage of adults supported at home who agreed that their
health and social care services seemed to be well co-ordinated
(Scotland 66%; Moray 62%)
o Percentage of adults receiving any care support who rate it as
excellent or good (Moray 68%; Scotland 75%).
o Percentage of people with positive experience of care at their GP
practice (Scotland 67%; Moray 60%),
o Percentage of adults supported at home who agree that their
services and support had an impact on improving or maintaining
their quality of life (Scotland 78%; Moray 73%), and
o Percentage of adults supported at home who agree they felt safe
(Scotland 80%; Moray 72%). 
No data has been published for the indicator that measures whether staff
would recommend their workplace as a good place to work. 
4.40 In 2020/21 for the ten data indicators that have published data Moray was
performing better than Scotland for 7, and marginally below the overall
Scottish performance for the other 3. 
Page 19

Page 20

Page 20

Page 21

5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2019 – 2029”
Performance management reporting is a legislative requirement under
section 42 of the Public Bodies (Joint Working) (Scotland) Act 2014.   
In addition to publishing an Annual Performance Report, the Moray
Integration Scheme requires that the MIJB will “monitor the performance
of the delivery of integrated services using the Strategic Plan on an
ongoing basis” (para 5.2.2 of the Moray Integration Scheme refers). 
(b) Policy and Legal
None directly associated with this report. 
(c) Financial implications
None directly associated with this report. 
(d) Risk Implications and Mitigation
There are no risk issues arising directly from this report. The long-term
impact of the COVID-19 on the Health and Social Care system are still
unknown and performance measurement will remain flexible to enable
the service to be prepared and react to any future developments. 
(e) Staffing Implications  
None directly associated with this report. 
(f) Property
None directly associated with this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required for the Performance
Framework because there will be no impact, as a result of the report, on
people with protected characteristics. 
(h) Climate Change and Biodiversity Impacts
No climate change or biodiversity implications have been determined for
this policy/activity. It should be noted that extreme weather events, such
as the recent storms, are expected to occur more frequently and with
greater ferocity in future years. In the longer-term there are likely to be
issues with the reduction in availability and increases in costs of fossil
fuels that will pose challenges for the delivery of care services to people
living in rural areas. 
(i) Directions
There are no directions arising from this report. 
(j) Consultations
For Health and Social Care Moray the Chief Officer, Corporate Officer
and Service Managers in relation to respective areas have been
consulted as has Tracey Sutherland, Committee Services Officer, Moray
Council and their comments are incorporated in the report.
Page 21

Page 22

6. CONCLUSION 
6.1 This report provides the MIJB with an overview of the performance of
specified Local and National indicators and outlines actions to be
undertaken to improve performance in Section 4 and expanded on in
APPENDIX 1.   
6.2 In addition, this report provides the MIJB with an overview of
performance against the indicators reported to the Ministerial Strategic
Group for Health and Community Care (APPENDIX 2) and the National
Health and Social Care Integration indicators (APPENDIX 3). 
Authors of Report: Jeanette Netherwood, Corporate Manager
Carl Bennett, Senior Performance Officer
Background Papers: Available on request
Ref: 
Page 22

Page 23

Appendix 1
PERFORMANCE REPORT
- SUPPORTING CHARTS
QUARTER 4
2021/22
(1 JANUARY 2022 – 31 MARCH 2022)
Item 5.
Page 23

Page 24

Table of Contents  
Health and Social Care Moray - 1 - 2021-22 Quarter 4 Performance Report
1. TABLE OF CONTENTS
1. Table of Contents ............................................................................................................................. 1
1. Performance Summary .................................................................................................................... 2
Barometer Overview ........................................................................................................................... 2
2. Delayed Discharge - RED .................................................................................................................. 3
DD-01: Number of delayed discharges (including code 9, Census snapshot, at end of quarter) ....... 3
DD-02: Number of Bed Days Occupied by Delayed Discharges per quarter (inc code 9) per 1000 18+
population ........................................................................................................................................... 4
3. Emergency Admissions - AMBER ..................................................................................................... 5
EA-01: Rate of emergency occupied bed days for over 65s per 1000 population .............................. 5
EA-02: Emergency Admissions rate per 1000 population for over 65s .............................................. 6
EA-03: Number of people over 65 years admitted as an emergency in the previous 12 months per
1000 population .................................................................................................................................. 7
4. Emergency Department – GREEN .................................................................................................... 8
AE-01: ED Attendance rates per 1,000 population (All Ages) ............................................................. 8
5. Hospital Re-admissions - GREEN ...................................................................................................... 9
HR-01: Percentage of Emergency Re-admissions to hospital within 28 days - Moray Patients ......... 9
HR-02: Percentage of Emergency Re-admissions to hospital within 7 days - Moray Patients ......... 10
6. Mental Health - RED ...................................................................................................................... 11
MH-01: Percentage of patients commencing Psychological Therapy Treatment within 18 weeks of
referral ............................................................................................................................................... 11
7. Staff Management - RED ............................................................................................................... 12
SM-01: NHS Sickness Absence % of Hours Lost ................................................................................ 12
SM-02: Council Sickness Absence (% of Calendar Days Lost) ............................................................ 13
Council STAFF Absence OVER TIME – SCOTLAND COMPARISON...................................................... 14
Appendix 1: Key and Data Definitions .................................................................................................. 15
RAG Scoring Criteria .......................................................................................................................... 15
Peer Group Definition ....................................................................................................................... 15
Appendix 2: Strategic Priorities............................................................................................................. 16
Appendix 3: National Health and Wellbeing Outcomes ....................................................................... 18 
Page 24

Page 25

Performance Summary  
Health and Social Care Moray - 2 - 2021-22 Quarter 4 Performance Report
1. PERFORMANCE SUMMARY
BAROMETER OVERVIEW 
Moray currently has 11 local indicators. Of these 3 are Green, 2 are Amber and 5 are Red. 
Figure 1 - Performance Summary                                                                                                                                                         
Q4 2021 Q1 2122 Q2 2122 Q3 2122 Q4 2122 New Target Previous Target
Jan-Mar Apr-Jun Jul-Sep Oct-Dec Jan-Mar (from Q1 2122) (from Q1 2021 or earlier)
AE Accident and Emergency
AE-01 A&E Attendance rate per 1000 population (All Ages) 17.8 23.5 21.7 20.0 20.2 no change 21.7 G‚
DD Delayed Discharges
DD-01* Number of delayed discharges (including code 9) at census point 17 20 30 39 46 no change 10 R
DD-02
Number of bed days occupied by delayed discharges (including code 9) at census
point 496 592 784 1142 1294 no change 304 R
EA Emergency Admissions
EA-01 Rate of emergency occupied bed days for over 65s per 1000 population 1773 1859 1934 2045 2140 2037 2107 R
EA-02 Emergency admission rate per 1000 population for over 65s 174.8 185.9 190.4 187.2 183 179.9 179.8 A
EA-03
Number of people over 65 years admitted as an emergency in the previous 12
months per 1000 population 119.3 124.1 126.7 126.3 125.2 123.4 124.6 A
HR Hospital Readmissions
HR-01 % Emergency readmissions to hospital within 7 days of discharge 5.0% 4.4% 4.1% 3.5% 3.4% no change 4.2% G‚
HR-02 % Emergency readmissions to hospital within 28 days of discharge 9.8% 9.2% 8.4% 8.4% 8.0% no change 8.4% G‚
MH Mental Health
MH-01
% of patients commencing Psychological Therapy Treatment within 18 weeks of
referral 100% 100% 100% 67% 33.0% no change 90% R
SM Staff Management
SM-01 NHS Sickness Absence (% of hours lost) 3.1% 4.2% 6.0% 5.5% 4.7% no change 4% R                                                             
Health and Social Care Moray Performance Report                                          
Code Barometer (Indicator) RAG
Page 25

Page 26

Delayed Discharge - RED  
Health and Social Care Moray - 3 - 2021-22 Quarter 4 Performance Report
2. DELAYED DISCHARGE - RED
Trend Analysis 
The number of delays at snapshot (46) and number of bed days lost due to delayed discharges (1294)
have both increased since Q3 2021/22.  Prior to March 2021 both figures had been reducing.  It had
been hoped that with the third wave reaching a peak during quarter 3 the number of people facing a
delay in being discharged from hospital would have shown a reduction during quarter 4. However,
the Omicron variant reversed any improvements that had been made and the number of people being
delayed from being discharged from hospital was at the highest level recorded since January 2019.
Bed-days lost to delayed discharge are over 4 times the target that has been set. 
DD-01: NUMBER OF DELAYED DISCHARGES (INCLUDING CODE 9, CENSUS SNAPSHOT,
AT END OF QUARTER)
Purpose 
Reliably achieving timely discharge from hospital is an important indicator of
quality and is a marker for person centred, effective, integrated, and harm
free care.
Strategic Priority  2: HOME FIRST Linked Indicator(s) DD-02
National Health & Wellbeing Outcomes 2, 3, 5, 7 
Figure 2 – Delayed Discharges 
Indicator Trend – Increasing
Despite some volatility in numbers from month to month the underlying trend for the number of
people experiencing Delayed Discharge has been steadily increasing since the end of Quarter 4
2020/21.
Source Public Health Scotland 
Page 26

Page 27

Delayed Discharge - RED  
Health and Social Care Moray - 4 - 2021-22 Quarter 4 Performance Report 
DD-02: NUMBER OF BED DAYS OCCUPIED BY DELAYED DISCHARGES PER QUARTER (INC
CODE 9) PER 1000 18+ POPULATION 
Purpose  This monitors the number of people delayed in hospital once medically fit
for discharge. Longer stays in hospital are associated with increased risk of
infection, low mood, and reduced motivation.
Strategic Priority  2: HOME FIRST Linked Indicator(s) DD-01
National Health & Wellbeing Outcomes 2, 3, 5, 7 
Figure 3 – Delayed Discharge Bed-days 
Indicator Trend – Increasing
The number of bed-days are over 4 times the target number of days and have shown no sign of
reducing during 2021-22.
Source Public Health Scotland
Page 27

Page 28

Emergency Admissions - RED  
Health and Social Care Moray - 5 - 2021-22 Quarter 4 Performance Report
3. EMERGENCY ADMISSIONS - RED
Trend Analysis
Since March 2021 there has been a steady increase each month in the rate of emergency occupied
bed days for over 65s and the rate increased during quarter 4 from 2,045 to 2,140 in March 2022.
However, the emergency admission rate per 1000 population for over 65s has reduced from 187.2 to
183 over the same period, while the number of people over 65 admitted to hospital in an emergency
also reduced from 126.3 to 125.2. 
EA-01: RATE OF EMERGENCY OCCUPIED BED DAYS FOR OVER 65S PER 1000
POPULATION
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a narrative
when viewed together of whether emergency admissions and bed days are
within tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) EA-02, EA-03
National Health & Wellbeing Outcomes 1, 2, 3, 5 
Figure 4 – Emergency Occupied Bed-days (Over 65s) 
Indicator Trend – Increasing
This indicator was on a downward trend for most of 2020, but since the start of 2021 has been
increasing and has now exceeded the reduced target that has been set for 2 consecutive
quarters.
Source Health Intelligence  
Page 28

Page 29

Emergency Admissions - RED  
Health and Social Care Moray - 6 - 2021-22 Quarter 4 Performance Report
EA-02: EMERGENCY ADMISSIONS RATE PER 1000 POPULATION FOR OVER 65S
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a story when
viewed together of whether emergency admissions and bed days are within
tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) EA-01, EA-03 
National Health & Wellbeing Outcomes  1, 2, 3, 5 
Figure 5 – Emergency Admissions (Over 65s) 
Indicator Trend – Reducing
At the start of 2021 the trend had been rapidly increasing, but since August there has been a
steady and sustained reduction, albeit above the target of 179.9 admissions per 1,000
population.
Source Health Intelligence  
Page 29

Page 30

Emergency Admissions - RED  
Health and Social Care Moray - 7 - 2021-22 Quarter 4 Performance Report
EA-03: NUMBER OF PEOPLE OVER 65 YEARS ADMITTED AS AN EMERGENCY IN THE
PREVIOUS 12 MONTHS PER 1000 POPULATION
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a story when
viewed together of whether emergency admissions and bed days are
within tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) EA-01, EA-02
National Health & Wellbeing Outcomes 1, 2, 3, 5 
Figure 6 – Number of Over 65 People Emergency Admissions 
Indicator Trend – Reducing
This indicator was showing a consistent downward trend until February 2021, since when the
trend reversed and increased rapidly. As with Figure 4 the rate levelled off in August and remains
above target with a figure of 125.2 per 1,000 population. 
Source Health Intelligence  
Page 30

Page 31

Emergency Department – GREEN  
Health and Social Care Moray - 8 - 2021-22 Quarter 4 Performance Report
4. EMERGENCY DEPARTMENT – GREEN
Trend Analysis 
There has been a very slight increase in the rate per 1,000 this quarter from 20.0 to 20.2, meeting the target
but almost double the number presenting in April 2020. Since June 2021 the trend had been reducing in
gradual steps until March 2022. 
AE-01: ED ATTENDANCE RATES PER 1,000 POPULATION (ALL AGES)
Purpose  A greater system-wide understanding of how people access emergency
care, and why certain choices are made, will allow local health systems to
develop intelligence about avoidable attendances at emergency
departments and target their responses. 
Strategic Priority  3: PARTNERS IN CARE Linked Indicator(s) HR-01, HR-02
National Health & Wellbeing Outcomes  1, 2, 3, 5 
Figure 7 – ED Attendance Rate 
Indicator Trend – Stable
During quarter 3 the attendance rate per 1,000 population has remained stable, below the target
level. However, the attendance rate is almost double the rate experienced at the end of April
2020.
Source Health Intelligence  
Page 31

Page 32

Hospital Re-admissions - GREEN  
Health and Social Care Moray - 9 - 2021-22 Quarter 4 Performance Report
5. HOSPITAL RE-ADMISSIONS - GREEN
Trend Analysis 
Both indicators in this barometer remain green. 28-day re-admissions are 8.0% and 7-day Re-
admissions are at 3.4%. 
HR-01: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO HOSPITAL WITHIN 28 DAYS
- MORAY PATIENTS
Purpose  Re-admissions are often undesirable for patients and have also been shown
to be associated with the quality of care provided to patients at several
stages along the clinical pathway, including during initial hospital stays,
transitional care services and post-discharge support. (This measure lags by
a month due to the time required for a potential 28 day discharge to occur)
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) HR-02, AE-01
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 8 – 28-dayEmergency Readmissions 
Indicator Trend – Stable
28-day Hospital Re-admissions have remained around the target of 8.4% this quarter.
Source Health Intelligence  
Page 32

Page 33

Hospital Re-admissions - GREEN  
Health and Social Care Moray - 10 - 2021-22 Quarter 4 Performance Report
HR-02: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO HOSPITAL WITHIN 7 DAYS -
MORAY PATIENTS
Purpose  Re-admissions are often undesirable for patients and have also been shown
to be associated with the quality of care provided to patients at several
stages along the clinical pathway, including during initial hospital stays,
transitional care services and post-discharge support.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) HR-01, AE-01
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 9 – 7-day Emergency Readmissions 
Indicator Trend – Stable
7-day Hospital Re-admissions have remained below the target of 4.2% this quarter.
Source Health Intelligence
Page 33

Page 34

Mental Health – RED  
Health and Social Care Moray - 11 - 2021-22 Quarter 4 Performance Report
6. MENTAL HEALTH – RED 
Trend Analysis 
After 24 months below target and a year at around 20% this measure was at 100% for the 6 months
from December 2020 through to June 2021. However, quarter 3 has shown a rapid reduction with
67% of patients being referred within 18 weeks during December 2022. 
MH-01: PERCENTAGE OF PATIENTS COMMENCING PSYCHOLOGICAL THERAPY
TREATMENT WITHIN 18 WEEKS OF REFERRAL
Purpose  Timely access to healthcare is a key measure of quality and that applies
equally in respect of access to mental health services.
Strategic Priority  3: PARTNERS IN CARE Linked Indicator(s) 
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 10 – Psychological Therapy Treatment within 18 Weeks 
Indicator Trend – Reducing
Having been at 100% for four quarters in a row this measure has remained below target during
quarter 4, and reduced significantly compared to quarter 3.
Source Health Intelligence  
Page 34

Page 35

Staff Management - RED  
Health and Social Care Moray - 12 - 2021-22 Quarter 4 Performance Report
7. STAFF MANAGEMENT - RED
Trend Analysis 
Sickness absence for NHS employed staff rose to 6.4%, one and a half times greater than the target
of 4%, during quarter 3, before reducing to 5.5%. It’s too early to identify a trend, but this may indicate
the peak is over. Council employed staff sickness has risen again from 7.8% to 8.05%, which is above
the figure for the same period in the previous year.  The rate of increase has decreased sharply during
quarter 3. 
SM-01: NHS SICKNESS ABSENCE % OF HOURS LOST
Purpose  Attendance at work of all employees is essential in the interests of the
effective and efficient operation of services.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) SM-02
National Health & Wellbeing Outcome  8 
Target (+10%) Q3 20/21 Q4 20/21 Q1 21/22 Q2 21/22 Q3 21/22 Q4 21/22
4% 3.6% 3.1% 4.2% 6.0% 5.5% 4.7% 
Figure 11 – NHS Sickness Absence 
Indicator Trend – Reducing
This indicator had been increasing over recent quarters but met the target of 4% for 2 months
this quarter before increasing once more in March 2022.
Source Health Intelligence 
Page 35

Page 36

Staff Management - RED  
Health and Social Care Moray - 13 - 2021-22 Quarter 4 Performance Report
SM-02: COUNCIL SICKNESS ABSENCE (% OF CALENDAR DAYS LOST)
Purpose  Attendance at work of all employees is essential in the interests of the
effective and efficient operation of services.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) SM-01
National Health & Wellbeing Outcome  1, 2, 3, 5
Target Q3 20/21 Q4 20/21 Q1 21/22 Q2 21/22 Q3 21/22 Q4 21/22
4% 6.2% 6.2% 6.95% 7.8% 8.05% N/A 
Figure 12 – Moray Council Sickness Absence 
Indicator Trend – Increasing
This indicator continues to rise, remaining above target although it is significantly lower than the
figure of 9% recorded in quarter 4 2019/20 when it reached a peak.   
Due to staff absences within the Council HR team the quarter 4 data are not yet available
Source Council HR 
Page 36

Page 37

Staff Management - RED  
Health and Social Care Moray - 14 - 2021-22 Quarter 4 Performance Report 
COUNCIL STAFF ABSENCE OVER TIME – SCOTLAND COMPARISON 
Chart provided by the Improvement Service using data from the from weekly SOLACE council
returns. This update captures data from the week ending 27 May 2022. 
Figure 13 – Moray Council Sickness Absence Compared to National Average   
Page 37

Page 38

Staff Management - RED  
Health and Social Care Moray - 15 - 2021-22 Quarter 4 Performance Report
APPENDIX 1: KEY AND DATA DEFINITIONS
RAG SCORING CRITERIA
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within specified tolerance.
RED If Moray is performing worse than target but outside of specified
tolerance.
▲ − ▼ Indicating the direction of the current trend. 
PEER GROUP DEFINITION
Moray is defined as being in Peer Group 2 in the Local Government Benchmarking Framework 
Family Group 1 Family Group 2 Family Group 3 Family Group 4
East Renfrewshire
East Dunbartonshire
Aberdeenshire
Edinburgh, City of
Perth & Kinross
Aberdeen City
Shetland Islands
Orkney Islands
Moray
Stirling
East Lothian
Angus
Scottish Borders
Highland
Argyll & Bute
Midlothian
Falkirk
Dumfries & Galloway
Fife
South Ayrshire
West Lothian
South Lanarkshire
Renfrewshire
Clackmannanshire
Eilean Siar
Dundee City
East Ayrshire
North Ayrshire
North Lanarkshire
Inverclyde
West Dunbartonshire
Glasgow City 
Page 38

Page 39

Staff Management - RED  
Health and Social Care Moray - 16 - 2021-22 Quarter 4 Performance Report
APPENDIX 2: STRATEGIC PRIORITIES 
Page 39

Page 40

Staff Management - RED  
Health and Social Care Moray - 17 - 2021-22 Quarter 4 Performance Report  
•EA-01: RATE OF EMERGENCY OCCUPIED BED DAYS FOR OVER
65S PER 1000 POPULATION
•EA-02: EMERGENCY ADMISSIONS RATE PER 1000 POPULATION
FOR OVER 65S
•EA-03: NUMBER OF PEOPLE OVER 65 YEARS ADMITTED AS AN
EMERGENCY IN THE PREVIOUS 12 MONTHS PER 1000
POPULATION
•HR-01: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO
HOSPITAL WITHIN 28 DAYS -MORAY PATIENTS (DR GRAY’S)
•HR-02: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO
HOSPITAL WITHIN 7 DAYS -MORAY PATIENTS (DR GRAY’S)
•SM-01: NHS SICKNESS ABSENCE % OF HOURS LOST
•SM-02: COUNCIL SICKNESS ABSENCE (% OF CALENDAR DAYS
LOST)
BUILDING
RESILIENCE
•DD-01: NUMBER OF DELAYED DISCHARGES (INCLUDING CODE 9,
CENSUS SNAPSHOT, AT END OF QUARTER)
•DD-02: NUMBER OF BED DAYS OCCUPIED BY DELAYED
DISCHARGES PER QUARTER (INC CODE 9) PER 1000 18+
POPULATION
•UN-01: NUMBER OF LONG-TERM HOME CARE HOURS UNMET
AT WEEKLY SNAPSHOT
•UN-02: NUMBER OF PEOPLE WITH LONG-TERM CARE HOURS
UNMET AT WEEKLY SNAPSHOT
HOME
FIRST
•OA-01: NUMBER OF REVIEWS OUTSTANDING AT END OF
QUARTER SNAPSHOT
•MH-01: PERCENTAGE OF PATIENTS COMMENCING
PSYCHOLOGICAL THERAPY TREATMENT WITHIN 18 WEEKS OF
REFERRAL
•AE-01: A&E ATTENDANCE RATES PER 1000 POPULATION (ALL
AGES)
PARTNERS
IN CARE
Page 40

Page 41

Staff Management - RED  
Health and Social Care Moray - 18 - 2021-22 Quarter 4 Performance Report
APPENDIX 3: NATIONAL HEALTH AND WELLBEING OUTCOMES
1 - PEOPLE ARE ABLE TO LOOK AFTER AND IMPROVE THEIR OWN HEALTH AND WELLBEING AND
LIVE IN GOOD HEALTH FOR LONGER. 
2 - PEOPLE, INCLUDING THOSE WITH DISABILITIES OR LONG-TERM CONDITIONS, OR WHO ARE
FRAIL; ARE ABLE TO LIVE, AS FAR AS REASONABLY PRACTICABLE, INDEPENDENTLY AT HOME,
OR IN A HOMELY SETTING IN THEIR COMMUNITY. 
3 - PEOPLE WHO USE HEALTH AND SOCIAL CARE SERVICES HAVE POSITIVE EXPERIENCES OF
THOSE SERVICES, AND HAVE THEIR DIGNITY RESPECTED. 
4 - HEALTH AND SOCIAL CARE SERVICES ARE CENTRED ON HELPING TO MAINTAIN OR IMPROVE
THE QUALITY OF LIFE OF PEOPLE WHO USE THOSE SERVICES. 
5 - HEALTH AND SOCIAL CARE SERVICES CONTRIBUTE TO REDUCING HEALTH INEQUALITIES. 
6 - PEOPLE WHO PROVIDE UNPAID CARE ARE SUPPORTED TO LOOK AFTER THEIR OWN HEALTH
AND WELLBEING, INCLUDING TO REDUCE ANY NEGATIVE IMPACT OF THEIR CARING ROLE ON
THEIR OWN HEALTH AND WELLBEING. 
7 - PEOPLE USING HEALTH AND SOCIAL CARE SERVICES ARE SAFE FROM HARM. 
8 - PEOPLE WHO WORK IN HEALTH AND SOCIAL CARE SERVICES FEEL ENGAGED WITH THE WORK
THEY DO AND ARE SUPPORTED TO CONTINUOUSLY IMPROVE THE INFORMATION, SUPPORT,
CARE, AND TREATMENT THEY PROVIDE. 
9 - RESOURCES ARE USED EFFECTIVELY AND EFFICIENTLY IN THE PROVISION OF HEALTH AND
SOCIAL CARE SERVICES.
Page 41

Page 42

Page 42

Page 43

/
Ministerial Strategic Group for Health and Community Care
The work of the Ministerial Strategic Group for Health and Community Care has now concluded, with its last meeting
taking place in January 2020. Much progress has been made to implement the 25 proposals set out in the group’s review
of integration final report and an update on progress made against these proposals was provided to the Health and Sport
Committee by the then Cabinet Secretary for Health and Sport in February 2021. However, there is still outstanding work
to do to ensure the success of integration across Scotland. While some of this work will be taken forward by the
establishment of the new National Care Service, the Scottish Government will continue to identify and progress
improvements within the current system during the establishment of the National Care Service (NCS). We will take forward
this work with Integration Authorities, their Chief Officers, Boards and stakeholders to realise the full potential of integration
and ensure that the people of Scotland get the right support, in the right place, at the right time, no matter their care needs.
There are six MSG indicators:
1. Emergency admissions
2. Unscheduled hospital bed days
3. A&E performance
4. Delayed discharges
5. End of life care
6. The balance of care across institutional and community services. 
This data is currently produced by Public Health Scotland on a monthly basis and is circulated to partnership colleagues in the form of an excel spreadsheet.
Contact: phs.source@nhs.net
Charts for residents of all ages
HSCM - MSG Integration Indicators
Item 5.
Page 43

Page 44

/
1a - # Emergency Admissions 1b - # Admissions from A&E (ED) - All Ages 2b - # Unscheduled Bed-days; Acute Specialities
695695695
604604604
692692692 735735735664664664702702702
801801801
712712712
592592592546546546
662662662 636636636578578578
734734734694694694726726726
578578578
668668668
Number of Admissions
April 2018
April 2019
April 2020
April 2021
August 2018
December 2018
August 2019
December 2019
August 2020
December 2020
August 2021
December 2021
0
200
400
600
800
1,000
Number of Admissions
Percentage Conversion Rate
391391391 404404404 378378378
471471471
572572572
408408408486486486 507507507
408408408
588588588 580580580
447447447
19.8%19.8%19.8%
16.8%16.8%16.8%
20.7%20.7%20.7% 20.9%20.9%20.9%
22.8%22.8%22.8%
26.1%26.1%26.1%
24%24%24%
30.2%30.2%30.2%
27%27%27%
25.7%25.7%25.7%
28.3%28.3%28.3%
31.6%31.6%31.6%
32.7%32.7%32.7%
29.7%29.7%29.7%
23.3%23.3%23.3%
24.5%24.5%24.5%
27.1%27.1%27.1%
29.7%29.7%29.7%
25.5%25.5%25.5%
Number of Admissions
Conversion Rate (%)
April 2018
July 2019
October 2020
January 2022
September 2018
February 2019
December 2019
May 2020
March 2021
August 2021
0
1,000
250
500
750
15%
20%
25%
30%
35%
5,3635,3635,363 5,1605,1605,160
4,3074,3074,307
4,8444,8444,844 5,1205,1205,120
5,6705,6705,670
3,6213,6213,621
4,1904,1904,190
4,6884,6884,688
4,0744,0744,074
5,0165,0165,016
3,0303,0303,030
4,0744,0744,074
4,6884,6884,688
Number of Bed-days
April 2018
April 2019
April 2020
April 2021
August 2018
December 2018
August 2019
December 2019
August 2020
December 2020
August 2021
December 2021
0
2,000
4,000
6,000
Page 44

Page 45

/
2b - # Unscheduled Bed-days; geriatric long stay 3a - # A&E (ED) Attendances 3b - % A&E (ED) seen within 4 hours
Number of Unscheduled Bed-days
Q1 2018/…
Q2 2018/19
Q3 2018/19
Q4 2018/19
Q1 2019/20
Q2 2019/20
Q3 2019/20
Q4 2019/20
Q1 2020/21
Q2 2020/21
Q3 2020/21
Q4 2020/21
Q1 2021/22
Q2 2021/22
Q3 2021/22
0
2
4
6
8
10
1,9781,9781,978
2,2292,2292,229
1,8101,8101,810
2,0342,0342,034
2,2532,2532,253 2,3742,3742,374
2,0072,0072,007
1,6781,6781,678
1,3021,3021,302
1,8861,8861,886
1,6231,6231,623
1,3331,3331,333
1,8211,8211,821
2,0412,0412,041
2,2662,2662,266
1,9551,9551,955
1,3331,3331,333
1,7081,7081,708
Number of Attendances
April 2018
April 2019
April 2020
April 2021
August 2018
December 2018
August 2019
December 2019
August 2020
December 2020
August 2021
December 2021
0
500
1,000
1,500
2,000
2,500
96.6%96.6%96.6%
97.7%97.7%97.7%
94.8%94.8%94.8%
90.8%90.8%90.8%
95.8%95.8%95.8%
94.2%94.2%94.2%
96.4%96.4%96.4%
94.9%94.9%94.9%
93.1%93.1%93.1%
90.4%90.4%90.4%
91.6%91.6%91.6%
93%93%93%
95.2%95.2%95.2%
88.3%88.3%88.3%
93.9%93.9%93.9%
89.4%89.4%89.4%
90.6%90.6%90.6%
91.7%91.7%91.7%
87.9%87.9%87.9%
79.4%79.4%79.4%
81.8%81.8%81.8%
80.6%80.6%80.6%
Percentage on time
April 2018
April 2019
April 2020
April 2021
August 2018
December 2018
August 2019
December 2019
August 2020
December 2020
August 2021
December 2021
75%
80%
85%
90%
95%
100%
Page 45

Page 46

/
4 - Delayed Discharge Bed-days 5a - % last 6 months of life by setting 5b - # days by setting (last 6 months of life)
1,1271,1271,127
893893893
1,3391,3391,339
1,1391,1391,139
968968968
810810810 751751751
1,0751,0751,075
1,2961,2961,296
332332332
566566566
876876876
735735735
595595595
770770770
623623623
784784784
948948948
1,2011,2011,201
# Bed-days
April 2018
April 2019
April 2020
April 2021
August 2018
December 2018
August 2019
December 2019
August 2020
December 2020
August 2021
December 2021
0
250
500
750
1,000
1,250
1,500
88.8%88.8%88.8% 89.4%89.4%89.4% 90%90%90% 90.2%90.2%90.2% 89.4%89.4%89.4% 90%90%90% 90.6%90.6%90.6% 91.7%91.7%91.7%
Large Hospital - %
Community Hospital - %
Hospice/Palliative Care - %
Community - %
2013/14
2014/15
2015/16
2016/17
2017/18
2018/19
2019/20
2020/21
0
25
50
75
100
5,0075,0075,007
5,5505,5505,550
5,2885,2885,288 5,3845,3845,384
5,9925,9925,992 4,9714,9714,971
6,1596,1596,159 3,8443,8443,8441,7491,7491,749
2,0912,0912,091 1,4581,4581,458
746746746
948948948 839839839 997997997
44,26944,26944,269
56,68256,68256,682 52,17652,17652,17653,48753,48753,487 51,22451,22451,224 50,45750,45750,457 56,04056,04056,040 55,94255,94255,942
Large Hospital - Days
Community Hospital - Days
Hospice/Palliative Care - Days
Community - Days
2013/14
2014/15
2015/16
2016/17
2017/18
2018/19
2019/20
2020/21
0
20,000
40,000
60,000
80,000
Page 46

Page 47

/
6 - % Population in Community or Institutional Settings MSG PIs (data for All Ages)
... Code & Title Gauge Value Target
HSCM - MSG1a Number of emergency admis… 668
HSCM - MSG1b Admissions from A&E (ED) 508
HSCM - MSG2a Number of unscheduled hosp… 4,688
HSCM - MSG2b Number of unscheduled hosp… 0
HSCM - MSG3a A&E Attendances 1,708
HSCM - MSG3b A&E seen within 4 hours 80.3%
HSCM - MSG4 Delayed discharge bed days 1,201
HSCM - MSG5a Percentage of last six months… 99.91%
HSCM - MSG5a01 Percentage of last six mont… 91.7%
HSCM - MSG5a02 Percentage of last six mont… 0.01%
HSCM - MSG5a03 Percentage of last six mont… 3.2%
HSCM - MSG5a04 Percentage of last six mont… 5%
HSCM - MSG5b Number of days by setting du… 61,685
HSCM - MSG5b01 Number of days by setting … 55,942
HSCM - MSG5b02 Number of days by setting … 774
HSCM - MSG5b03 Number of days by setting … 1,125
HSCM - MSG5b04 Number of days by setting … 3,844
HSCM - MSG6 Balance of care: Percentage of… 100%
HSCM - MSG6-01 Balance of care: Percentag… 98.1%
HSCM - MSG6-02 Balance of care: Percentag… 1.1%
HSCM - MSG6-03 Balance of care: Percentag… 0.5%
HSCM - MSG6-04 Balance of care: Percentag… 0%
HSCM - MSG6-05 Balance of care: Percentag… 0.1%
HSCM - MSG6-06 Balance of care: Percentag… 0.2%
Charts for residents aged 65 years old and over
0.2%0.2%0.2% 0.2%0.2%0.2% 0.2%0.2%0.2% 0.2%0.2%0.2% 0.2%0.2%0.2%0.1%0.1%0.1% 0.1%0.1%0.1%
97.8%97.8%97.8% 97.9%97.9%97.9% 98%98%98% 98.2%98.2%98.2% 98%98%98% 98.1%98.1%98.1% 98.1%98.1%98.1%
Large Hospital - %
Community Hospital - %
Hospice/Palliative Care Unit - %
Care Home - %
Home (Supported) - %
Home (Unsupported) - %
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20
0%
25%
50%
75%
100%
Page 47

Page 48

/
PIs - for population aged 65+
Code & Title Value Last Update History
HSCM - MSG1a-65+ Number of emergency admissions (65 year olds and older)
HSCM - MSG1b-65+ Admissions from A&E (ED) for patients aged 65 years and older
HSCM - MSG2a-65+ Number of unscheduled hospital bed days; acute specialties (65…
HSCM - MSG2b-65+ Number of unscheduled hospital bed days; geriatric long stay (…
HSCM - MSG3a-65+ A&E attendances - 65 year olds and older
HSCM - MSG6-65+ Balance of care: Percentage of population in community or institu…
HSCM - MSG6a65+ Balance of care: Percentage of population at Home - Unsupporte…
HSCM - MSG6b65+ Balance of care: Percentage of population at Home - Supported …
HSCM - MSG6c65+ Balance of care: Percentage of population in Care Homes Resid…
HSCM - MSG6d65+ Balance of care: Percentage of population in Hospice/Palliative …
HSCM - MSG6e65+ Balance of care: Percentage of population in Community Hospita…
HSCM - MSG6f65+ Balance of care: Percentage of population in Large Hospital Resi…
Page 48

Page 49

Appendix 3
Item 5.
Page 49

Page 50

Page 50

Page 51

Page 51

Page 52

Page 52

Page 53

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 30 JUNE 2022 
SUBJECT: INTERNAL AUDIT – COMPLETED PROJECTS  
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 To provide an update on audit work completed since the last meeting of the
Committee.   
2. RECOMMENDATION 
2.1 The Audit, Performance and Risk Committee is asked to consider and
note the audit update. 
3.  BACKGROUND 
3.1 Public Sector Internal Audit Standards (PSIAS) require the Chief Internal
Auditor to prepare and present reports to the committee on internal audit’s
activity relative to the audit plan and any other relevant matters. 
3.2     Challenges associated with the pandemic remain, resulting in significant
changes within current working practices that make the audit process more
difficult, and uncertainty still remains regarding these arrangements in the
period ahead. All audit staff are still working from home, which brings some
limitations to the audit process. 
3.3     In line with the approved internal audit plan, the following reviews were
completed: 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
Completed Projects- Client Monies
4.1 An audit has been undertaken of how Health and Social Care officers manage
income held for individuals under Corporate Appointeeship Arrangements.
Where no alternative exists, the Council can make an application to the
Department for Work and Pensions (DWP) for a named officer to become the
"Corporate Appointee" and have the legal authority to manage an individual's
personal finances. 
Item 6.
Page 53

Page 54

4.2 The audit involved a review of the procedures undertaken by the Community
Care Finance Team into how they manage client funds held within the
corporate bank account. In addition, a sample of individuals was also
selected, and a check was made on how the Health and Social Care officer
appointed as the named 'Corporate Appointee' manages and supports
individuals to access and use their funds appropriately. The executive
summary and recommendations for this project are given in Appendix 1. 
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2019 – 2029” 
Internal audit work supports good governance and assists in securing
appropriate systems of internal control. 
(b) Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications
Audit reports highlight risk implications and contain recommendations
for management to address as a means of mitigating.   
(e) Staffing Implications
No implications directly arising from this report 
(f)    Property
No implications. 
(g)   Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions
There are no directions arising as a direct result of this report. 
(j)    Consultations
There have been no direct consultations during the preparation of this       
report.     
6. CONCLUSION 
6.1 This report provides Committee with a summary of findings arising from
audit projects completed during the review period. 
Page 54

Page 55

Author of Report:  Dafydd Lewis, Chief Internal Auditor 
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/30062022 
Page 55

Page 56

Page 56

Page 57

Appendix 1 
AUDIT REPORT 22'011 
CLIENT MONIES 
Executive Summary 
The annual audit plan for 2021/22 provides for an audit review to be undertaken of how
Health and Social Care Officers manage income held for individuals under Corporate
Appointeeship arrangements. Where no alternative exists, the Council can make an
application to the Department for Work and Pensions (DWP) for a named officer to
become the 'Corporate Appointee' and have the legal authority to manage an individual's
personal finances. 
The Adults with Incapacity (Scotland) Act 2000 enables a Health and Social Care Officer
to be appointed by the DWP to have "Corporate Appointeeship" responsibility for
managing the benefits received by an individual. It was noted that other formal agreements
do exist, e.g. Access to Funds Scheme, Intervention or Guardianship orders, but a review
of these arrangements were not included within this review. It was found that 59 individuals
are being managed within the "Corporate Appointeeship" Scheme with a combined value
of £483,000 held within the Council's corporate bank account.   
The audit has involved scrutiny of processes undertaken by the Community Care Finance
Team in how they administer the corporate bank account. In addition, a sample of
individuals was also selected, and a check made as to how the Health and Social Care
Officer appointed as the named "Corporate Appointee" manages and supports individuals
to access their funds appropriately. 
The audit was carried out in accordance with Public Sector Internal Audit Standards
(PSIAS). 
The review has highlighted the following areas for improvement:- 
• Due to the requirements of remote working and pandemic restrictions, the
withdrawal of cash for clients has moved to a 4-weekly cycle. This has resulted in
changes in operating practices. A risk assessment review of current arrangements
should be undertaken to ensure best practices are followed for the protection of
both employees and the client's finances. Once this is carried out, procedures
require to be updated to reflect the agreed operating arrangements. 
• A lack of segregation of duties exists with the bank reconciliation being prepared
by the same officers who operate the account on a daily basis. An independent
management check should be included within this process. 
• The audit notes that the corporate bank account included £80,482 of funds in
relation to the combined balances of 10 deceased clients. Some of these funds
have been held for a period of up to 4 years with no contact made by any executor
of the deceased clients. Clarification should be obtained from Legal Services
regarding the length of time funds must be retained on behalf of deceased clients
and potential action that could be taken should the funds not be claimed within the
timeframe.
Item 6.
Page 57

Page 58

Appendix 1 
Recommendations 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Clear and current policy documents and operational guidelines have been developed for the financial management of client
monies. 
5.01 The Procedures for Managing
Service User's Money and
Corporate Appointeeship should
be reviewed and updated and a
subsequent regular cycle of
review maintained. 
Medium Yes Procedures
will be
reviewed to
incorporate
improvements
and changes
to practice. 
Commissioning
Manager
31/10/2022
5.02 Procedures for the management
of client monies should be
promoted to ensure there is an
awareness of their requirements
by all officers involved in client
finance administration. 
Medium Yes Procedures
will be
appropriately
promoted to
relevant
officers after
revision. 
Commissioning
Manager
31/10/2022
Page 58

Page 59

Appendix 1
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: Correct formal powers to administer client monies have been obtained. 
5.03 Clarification should be obtained
from Legal Services regarding
the length of time funds must be
retained on behalf of deceased
clients and potential action which
can be taken should the funds
not be claimed within the
timeframe. 
Consideration should also be
given to holding these funds
separate to the corporate bank
account for increased visibility.   
Medium Yes Clear guidance
will be
requested from
Legal Services
in order to be
able to
conclude
deceased
estates. This
will be added
to procedures
to ensure
deceased
client monies
are not being
held in the
corporate bank
account
beyond
acceptable
timescales. 
Community
Care Finance
Officer /
Support
Manager
31/10/2022
Page 59

Page 60

Appendix 1
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could
be improved. Urgent attention
required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls
absent, not being
operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Comments Responsible
Officer
Timescale for
Implementation
Key Control: All transactions should be for benefit of the client with justifiable supplier selection, verified to source documentation and in line
with the client's Financial Management Plan. Any cash held is done so securely and with full accounting arrangements. 
5.04 Due to changes in operating
practices a full review of current
cash handling procedures
should be undertaken. The
review should include a risk
assessment to ensure best
practices are followed regarding
the safety and security of both
officers and client funds.
Documented procedures should
thereafter be updated to reflect
any agreed changes. 
High Yes Options to be
prepared for
discussion by
the Practice
Governance
Group to agree
cash handling
procedures and
practices which
increase
security whilst
being practical
within
operational
capacity. 
Community
Care Finance
Officer /
Support
Manager
31/07/2022
Key Control: Robust records of fund administration per client are maintained.
5.05 Confirmation of the monthly
reconciliation of the Corporate
bank account to manual records
should be undertaken by
Community Care Finance
management. This should also
include the verification of a
sample of transactions to source
documentation. 
High Yes A four-weekly
management
review will be
implemented
and added to
the revised
procedures. 
Community
Care Finance
Officer /
Support
Manager
31/05/2022 
Page 60

Page 61

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 30 JUNE 2022 
SUBJECT: STRATEGIC RISK REGISTER – JUNE 2022 
BY:  CHIEF OFFICER 
1. REASON FOR REPORT 
1.1 To provide an overview of the current strategic risks, along with a summary of
actions which are in place to mitigate those risks, updated June 2022. 
2. RECOMMENDATION 
2.1 It is recommended that the Audit, Performance and Risk Committee
(APR) agree to: 
i) consider and note the updated Strategic Risk Register included in
APPENDIX 1; and 
ii) note the Strategic Risk Register will be further refined to align with
the transformation and redesign plans as they evolve 
3. BACKGROUND 
3.1 The strategic risk register is reviewed regularly by the Senior Management
Team as part of a robust risk monitoring framework, to identify, assess and
prioritise risks related to the delivery of services in relation to delegated
functions, particularly any which are likely to affect the delivery of the Strategic
Plan. 
3.2 The Moray Integration Joint Board (MIJB) Strategic Risk Register is attached
to this report at APPENDIX 1 and sets out the inherent risks being faced by
the MIJB, together with a current assessment on the level of the risks and
mitigating actions being taken to reduce the impact of the risks.  This report is
presented to Audit Performance and Risk committee for their oversight and
comment. 
3.3 Risk scores are weighted, based on assessment according to their likelihood
and corresponding impact, as per Section 5 of the MIJB Risk Policy.   
Item 7.
Page 61

Page 62

3.4 The Strategic Risks received an initial review to ensure they align to the
Moray Partners in Care 2019-2029 strategic plan which was agreed at MIJB
on 28 November 2019 (para 13 of the minute refers). 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The Risk Management Framework review was completed and outcome was
approved by the Board on 25 June 2020 (para 9 of the minute refers). The
approved Risk Appetite Statements have been included in APPENDIX 1. 
4.2 Work initially overseen by NE Partnership continues to progress locally, in line
with our Strategic Plan objectives.  Hospital without Walls and Hospital at
Home themes are being developed and will be progressed through the Home
First programme.  These workstreams are required to progress a new
approach to delivering person-focussed clinical services to people, for the
benefit of individuals through a person centred approach and to maximise
best use of available staff resources which continue to be stretched.   
4.3 The impact of covid continues to be felt across some services from staff
absences and is of particular concern in areas where there is a limitation on
options for cover for staff, such as in specialist residential care e.g. Woodview
as an example.  Contingency plans are in place but there continues to be
significant pressure on safe staffing levels in this area.  Managers continue to
reiterate the necessity for correct use of PPE, ventilation, hand hygiene and
lateral flow testing for all staff. 
4.4 Progression of development work had slowed during the increased pressure
on services across our system during the first quarter of the year as a result of
Covid.  Whilst there are still significant pressures in some areas of the system,
there are signs that other services are beginning to feel less in crisis.  There
continues to be a significant demand for social work assessments from the
community and there are high levels of unmet need for care provision in the
community which have been subject of separate reports to Clinical and Care
Governance Committee which have been escalated to Moray Integration Joint
Board ( 31 March 2022, para 9 of the minute refers).  Managers are working
with teams daily to try to meet the greatest needs through a variety of means
but there are still those who are not receiving a service.    These increases in
demands for service are being faced by staffing resource that is reduced due
to increasing sickness absence, staff vacancies, annual leave and the
continued need for some staff redeployment. 
4.5  The continued safe delivery of services is a priority and as such a
considerable amount of management time is being directed to support
oversight of operational risks to ensure they are managed and prioritised
across the whole system.  NHSG are reviewing the arrangements that were
developed during Operation Iris to determine what meetings structure is
required going forward , however the work that was undertaken to develop
Grampian Operational Escalation System (GOPES) will be maintained to
assist in the identification of pressure points across the whole system so that
they can be addressed and prioritised appropriately. 
4.6 There continues to be significant financial risk in the system which was
highlighted at the MIJB development session on 6 June 2022.  There have
Page 62

Page 63

been significant additional supports provided during the last two years and
whilst some of the additional funding is recurring, there is a recurring £3m
deficit that is forecast for 2023/24 which will require to be addressed in order
to be able to set a balanced budget.   Additional funding has been made
available by Scottish Government to support the increased pressures in the
system, including those presented by the winter period and performance
metrics are being identified to highlight progress in the key areas the funds
have been provided for.  These will be incorporated into future reports to this
committee. The senior management team have, and continue to, assess
where the funds should be applied for greatest benefit and approvals will be
sought as appropriate. 
4.7 Recruitment and selection to staff vacancies continues to prove challenging
across several services.  These challenges remain as previously reported
regarding lack of appropriate applications for some posts and also the time
taken to for the recruitment process in employing organisations to be followed. 
The recruitment cell in Care at Home services has been very successful when
31 new staff have been recruited in the period in comparison to 12 over same
period in 2021, 16 in 2020 and 8 in 2019. They have implemented a rolling
advert, weekly interviews and alignment of training schedules to make the
process as efficient as possible and their efforts have also facilitated releasing
management time to focus on service delivery. Staff wellbeing continues to be
a key priority and a significant emphasis is being placed on ensuring that
everyone is provided with the support that is readily available, where it is
required.  The issues that have been identified will be factored into the
developing workforce plan and collaborative work will be progressed with
partners across Grampian for recruitment. 
4.8 Work is progressing with Allied our partner for care at home on the outcome
based commissioning approach.  Whilst it was recognised by all involved that
it will be challenging to deliver these developments in the context of the
continued impact of the pandemic it was also recognised that change is
needed to create the capacity to meet the demand.  Delivering on outcomes,
rather than a time and task approach, underpins the MIJB strategic principles
of Home First and supports people having choice of how and where they are
cared for. However many current care packages are larger than those
delivered prior to the pandemic and there is a lot more 2 to 1 care being
provided at home, where previously the individual would have gone to
residential or nursing care.  This represents an increase in demand for
services but unfortunately, despite best efforts, internal Care at home services
and Allied have not been able to increase staffing levels to meet demand. 
Internal services have been recruiting successfully there have been many
staff who have reduced their contracted hours to gain a better work life
balance and more choice of hours they work.  In addition there are less
people choosing Option 1 for Self Directed Support (direct payment or
organisation of their choice) and limited people choosing Option 2 which
would be delivered by the four other care providers in the market locally.  This
places more demand for SDS Option 3 which is delivered by internal
partnership.  Due to the factors above currently capacity is not meeting
demand which is demonstrated in the increase in unmet need.  This situation
is not likely to improve in the short term as there are still more people awaiting
assessment which is likely to increase the demand for care in the community. 
Page 63

Page 64

4.9 NHSG moved out of Operation Iris, the management strategy in response to
Omicron, on 31 March 2022, services are no longer under emergency powers
as determined by  Scottish Government and there has been a de-escalation
of Covid-19 infection prevention and control measures.  Further work is being
taken forward by the NHSG weekly connect meeting to identify, establish and
embed any changes made over the last two years that are considered to have
improved service delivery.  Governance arrangements implemented during
the Covid response are being reviewed and either adopted as business as
usual or ceased.   
4.10 With the confirmation of the NHSG Portfolio arrangements across Grampian
and the likely delegation of Children and Families and Criminal Justice
services to MIJB, there will be a need for alignment of the governance
frameworks and a transition phase to accomplish this to ensure that staff are
clear of the priorities and that information flow remains effective. 
4.11 As plans evolve, the Strategic Risk Register will be updated to ensure that it
reflects any barriers to realising the ambitions we are not enacting, to achieve
the vision set out in our Strategic Plan. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2019-2029”
The MIJB requires effective governance arrangements for those services
and functions delegated to it and Risk Management systems are integral
to this. 
(b) Policy and Legal
As set out in the terms of reference, the Board has responsibility to
provide assurance of the adequacy of the risk management framework. 
There are no legal implications arising from this report.  
(c) Financial implications
There are no direct financial implications arising from this report however
the Board should note the failure to manage risks effectively could have
a financial impact for the MIJB. 
(d) Risk Implications and Mitigation
This report forms part of the governance arrangements for identifying
and managing strategic risks of the MIJB.  The risks are outlined in the
body of the report in section 4. 
(e) Staffing Implications
There are no additional staffing implications arising from this report. 
Senior Management Team have considered areas of high risk and are
seeking to redeploy staff to address these as a matter of urgency. 
(f) Property
There are no property implications arising from this report. 
Page 64

Page 65

(g) Equalities/Socio Economic Impact
An Equalities Impact Assessment is not required because there are no
service, policy or organisational changes being proposed. 
(h) Climate Change and Biodiversity Impacts
There are no impacts arising from this report. 
(i) Directions
None arising from this report. 
(j) Consultations
Consultations have been undertaken with the Senior Management
Team, Chief Internal Auditor and Tracey Sutherland, Committee
Services Officer and comments have been incorporated in this report. 
6. CONCLUSION 
6.1 This report and appendices contains proposed risk appetite statements
that, when approved, will underpin the MIJB approach to strategic
decision making.   
6.2 The report also outlines the current position in relation to the impact of
COVID-19 on progress with transformation plans, and recommends the
Board note the revised and updated version of the Strategic Risk
Register. 
Author of Report:  Jeanette Netherwood, Corporate Manager
Background Papers:   held by author
Ref: 
Page 65

Page 66

Page 66

Page 67

Appendix 1 
HEALTH AND SOCIAL CARE MORAY STRATEGIC RISK REGISTER 
AS AT 6 JUNE 2022 
Item 7.
Page 67

Page 68

Appendix 1 
RISK SUMMARY 
1. The Moray Integration Joint Board (MIJB) does not function as set out within the Integration Scheme, Strategic Plan and in-line
with Standing Orders and fails to deliver its objectives or expected outcomes.  
2. There is a risk of MIJB financial failure in that the demand for services outstripping available financial resources.  Financial
pressures being experienced by the funding Partners will directly impact on decision making and prioritisation of MIJB.
3. Inability to recruit and retain qualified and experienced staff to provide safe care whilst ensuring staff are fully able to manage
changes resulting from integration.
4. Inability to demonstrate effective governance and effective communication and engagement with stakeholders.
5. Inability to cope with unforeseen external emergencies or incidents as a result of inadequate emergency and resilience planning.
6. Risk to MIJB decisions resulting in litigation/judicial review.  Expectations from external inspections are not met.
7. Inability to achieve progress in relation to national Health and Wellbeing Outcomes.  Performance falls below acceptable level.
8. Inability to progress with delivery of Strategic Objectives and Transformation projects as a result of inability to resolve data sharing
and data security requirements.
9. Requirements for support services are not prioritised by NHS Grampian and Moray Council. 
RISK RATING LOW  MEDIUM HIGH  VERY HIGH
RISK MOVEMENT  DECREASE NO CHANGE INCREASE 
The process for managing risk is documented out with the MIJB Risk Policy. 
Page 68

Page 69

Appendix 1 
Description of
Risk: 
Regulatory
The Integration Joint Board (IJB) does not function as set out within the Integration Scheme, Strategic Plan and
Scheme of Administration and fails to deliver its objectives or expected outcomes.  
Lead: Chief Officer
Risk Rating:  Low/ medium/ high/ very high  MEDIUM
Risk Movement:  Increase/ decrease/ no change  INCREASING
Rationale for Risk
Rating: 
The strategic plan “Partners in Care” 2019 to 2029 was developed and launched in December 2019.  
Membership of IJB committees has recently changed due to the elections in May resulting in 4 new Council members,
the resignation of the third sector representative and the GP Lead and Non-Primary Care advisor.  An amendment to the
Scheme to increase membership by one from each of the partner organisations was ratified in March 2022 by the Scottish
Government following due process and approval by Moray Council and NHS Grampian Board.
During the initial Covid 19 response, normal business was suspended and emergency arrangements were implemented. 
IJB, CCG and APR meetings restarted during August 2020.  Weekly meetings were instigated with Chair/Vice Chair and
Chief Officer and these continue.  
Progress is underway to review the Strategic Plan “Partners in Care” 2019 to 2029
Rationale for Risk
Appetite: 
The Board, staff and providers across Moray are all committed to ensuring high standards of clinical care & governance
through operational policies.  Innovation and new ways of working may mean traditional regulations do not exist, or are
contradictory. 
We will only take regulatory risks knowingly, following consultation with the relevant regulatory body and where we have
clear risk mitigation in place. 
Controls: • Integration Scheme.
• Strategic Plan “”Partners in Care” 2019 to 2029
• Governance arrangements formally documented and approved by MIJB January 2021.
• Agreed risk appetite statement.
• Performance reporting mechanisms.
• Consultation with legal representative for all reports to committees and attendance at committee for key reports.
• Standing orders have been reissued to all members
Mitigating
Actions: 
Induction sessions are held for new IJB members with the next scheduled for 22 June 2022.  
IJB member briefings are held regularly. 
1
Page 69

Page 70

Appendix 1 
Conduct and Standards training held for IJB Members in December 2020 with updates provided by Legal Services as
appropriate and is scheduled for 22 June 2022. 
SMT regular meetings and directing managers and teams to focus on priorities. 
Regular development sessions held with IJB and System Leadership Group
Strategic Plan and locality management structure is in place The work that has been progressed through the Covid19
response has escalated developments in some areas as a matter of priority.  This has been achieved through
collaborative working with partner organisations and the third sector. 
Assurances: • Audit, Performance and Risk Committee oversight and scrutiny.
• Internal Audit function and Reporting
• Reporting to Board.
Gaps in
assurance: 
The Covid 19 Response caused a delay in producing the Transformation Plans which in turn has impacted on
communication and engagement with staff and partners in respect of the intended outcomes.  Work is underway on the
refresh of the Strategic plan and will incorporate the work being taken forward for Self-Directed support, Three
conversations, Locality Planning, Hospital at home and Hospital without walls 
Current
performance:
Scheme of administration is reported when any changes are required.  
Legal advisors are currently working on the requirements to the integration scheme in relation to the proposed
delegation of Children’s and Criminal Justice Services.
Report presenting the Strategic Plan, Communication Strategy, Organisational Development and Workforce Plans,
Performance Framework and the draft Transformational Plan were presented and approved at MIJB on 28 November
2019
Appointment of Standards Officer agreed by IJB 31 March 2022
Members Handbook has been updated and circulated to all members in June 2022.
Governance Framework was approved by IJB 28 January 2021. 
Comments: Strategic Planning and Commissioning Group approved the generic Terms of Reference and Chairs of the
transformation boards at the meeting on 19 December 2019.  It was intended that these boards would be established
by April 2020 however this work has been on hold due to Covid19 and is being restarted but will incorporate the
changes Covid is causing on ways of working and will recommend a revised way forward.  The interim Strategic
Planning Lead is now taking this forward. 
Page 70

Page 71

Appendix 1 
2
Description of
Risk: 
Financial
There is a risk of MIJB financial failure in that the demand for services outstrips available financial resources.  Financial
pressures being experienced both by the funding Partners and Community Planning Partners will directly impact on
decision making and prioritisation of MIJB.
Lead: Chief Officer/Chief Financial Officer
Risk Rating:  Low/ medium/ high/ very high VERY HIGH
Risk Movement:  Increase/ decrease/ no change NO CHANGE
Rationale for Risk
Rating: 
Whilst the 2020/21 and 2021/22 settlement saw additional investment for health and social care that was passed through
to the MIJB, there remains a significant pressure due to the recurring core overspend, since most of the new investment
related to new commitments. 
Financial settlements are set to continue on a one year only basis, which does not support sound financial planning.  
In addition, many uncertainties have arisen through the Covid response and continue as we continue to remobilise.  The
full impact is not yet quantifiable. 
Demand on services is greater than before and the IJB has £1.2m remaining general reserves.  There is however
significant earmarked reserves by the end of the 2021/22 financial year relating to the ongoing response to Covid and
Primary Care Improvement Plan and the Scottish Government additional investment of £300m for winter funding. 
The Revenue Budget 2022/23 was approved by MIJB on 31 March 2022, displaying a balanced position.  A small savings
plan of £0.11 million was approved.  Additional Scottish Government investment is provided again for 2022/23, this is to
meet additional policy commitments in respect of adult social care pay uplift for externally provided services and seeks
to ensure that capacity can be maximised and ensuring system flow.  The final outturn position will be finalised and
reported to the MIJB in June where it is anticipated there will be a small general reserve.
The update medium Term Financial Framework was presented as part of the budget papers on the 31st March 2022
however, it is imperative that this is further reviewed during the 2022/23 year to ensure alignment with the upcoming
revisions to the Strategic Plan.
Rationale for Risk
Appetite: 
The Board recognises the financial constraints all partners are working within. While we are cautious and open about
accepting financial risks this will be done: 
• Where a clear business case or rationale exists for exposing ourselves to the financial risk 
• Where we can protect the long term sustainability of health & social care in Moray   
Covid-19 continues to place additional risk on the MIJB finances as we continue through the pandemic, recover and
transform
Page 71

Page 72

Appendix 1 
Controls: Chief Finance Officer appointed - this role is crucial in ensuring sound financial management and supporting financial
decision making, budget reporting and escalation. The previous CFO vacated their post on 31 March 2022.  There is
interim cover but It is essential that a successor is appointed on a permanent basis as soon as practicable.
The CFO and Senior Management Team have worked together to address further savings which will be presented to
the Board for approval as part of the budget setting procedures for 2022/23.  This should be a focus of continuous
review to ensure any investment is made taking cognisance of existing budget pressures.  A revised Financial
Framework was presented to the MIJB on 31 March 2022, and a further review will take place once the current
strategic plan has been reviewed to assure alignment.
Mitigating
Actions: 
Risk remains of the challenge that the MIJB can deliver transformation and efficiencies at the pace required whilst dealing
with the pressures that are emerging as a result of the pandemic.    
Financial information is reported regularly to both the MIJB, Senior Management Team and System Leadership Group. 
The Chief Officer and Chief Financial Officer (CFO) continue to engage in finance discussions with key personnel of both
NHS Grampian and Moray Council.  These conversations have continued throughout the pandemic phase. 
Chief Officer and CFO will continue to engage with the partner organisations in respect of the financial position throughout
the year. Cross partnership performance meetings are in with partner CEOs, Finance Directors and the Chair/Vice Chair
of the MIJB. 
Assurances: MIJB oversight and scrutiny of budget.  Reporting through MIJB, NHS Grampian Board and Moray Council.
Gaps in
assurance:
None known
Current
performance:
For the 2021/22 financial year, overspend have been reported throughout the year, however, although the core services
recurring overspend remains, there is slippage in additional investments received late in the financial year.  The
provisional outturn it is expected that MIJB will finish the year with a small general reserve that has been created through
non- recurring slippage and a large earmarked reserve.  A final position will be presented to the MIJB on 30 June 2022.
Comments: Senior managers to work with Chief Officer and Chief Financial Officer to address the continuing financial challenge,
continuing to seek efficiencies and opportunities for real transformation as we look to make efficient and effective
investment in services that are truly transformational. 
Page 72

Page 73

Appendix 1 
3
Description of
Risk: 
Human Resources
(People):
Inability to recruit and retain qualified and experienced staff to provide and maintain sustainable, safe care, whilst
ensuring staff are fully able to manage change resulting from response to external factors such as the impact of Covid
and the actions that arose from the recommendations from the Independent Review of Adult Social Care 2021.
Lead: Chief Officer
Risk Rating:  Low/ medium/ high/ very high HIGH
Risk Movement:  Increase/ decrease/ no change INCREASING
Rationale for Risk
Rating: 
There continues to be issues with recruitment to some front line services that require specific skills and experience.  This
has been the case for some time now and continues to place pressure on existing staff.  Allied Health Professions, Social
Work are two particular areas experiencing difficulties with obtaining people with the appropriate skills and training. Care
at Home staffing levels are pressured for Internal services and externally with local providers all experiencing the same
difficulties. 
There are also impacts on recruitment of Dentists and other graduates arising from Covid as the number graduating has
reduced during the period. 
The various impacts of Covid-19 has  placed a significant strain on the Partnerships resources across frontline and
support functions and this has resulted in delays for the progress of projects relating to the achievement of strategic
objectives.   
The Care Homes in Moray have continued to do well to maintain their staffing levels throughout the pandemic and whilst
the difficulty with recruitment and retention of staff to caring roles is still being experienced.  There is a particular issue
with long term sickness, secondments and other absence in Care at Home management structure which is resulting in
reduced support to frontline staff and increasing pressure on remaining management staff.  Efforts are being made to
provide support but the situation remains challenging. 
There have been some achievements in the appointment to the Geriatrician post, and recruitment to agreed models for
orthopaedics, anaesthetics, general surgery and the emergency department in Dr Grays.  There is further work being
undertaken to develop the model for General medicine.  There has also been an appointment of an Adult Psychology
consultant.   The benefit of these appointments are being felt across the whole system.   
The transition from EU membership has not presented any specific concerns for workforce and this will continue to be
monitored. 
The impact of budgetary decisions by the Council in relation to reducing staffing levels has reduced levels of support
provided in some key areas for Health and Social Care Moray (HSCM), such as ICT, HR, Legal and design.  
Page 73

Page 74

Appendix 1 
Rationale for Risk
Appetite:
Safety risks that could result in harm to service users, staff or the public are inherent in Health & Social Care services.
The safety of individuals is paramount therefore standards of safety management and clinical care have to be high, and
the Board will continue to seek assurances this is the case. 
The Board’s ambition is for health & social care to be people centred. This means supporting people in decision making
about their own health & care, which may expose individuals to higher risk where they make an informed decision. 
The Board will also seek to balance individual safety risks with collective safety risks to the community. 
Controls: Management structure in place with updates reported to the MIJB. 
Organisational Development plan in place and Workforce Plans are being updated to align to the new strategic plan. 
Continued activity to address specific recruitment and retention issues.  The chief social worker reviewed the situation
with managers and employed a Consultant Practitioner to develop options for addressing some of the particular issues
affecting social work services in Moray and to provide support to managers and staff.  There continues to be pressures
around Social Work as more requests for assessment are being received from the community and an additional 3.68 FTE
have been appointed for a temporary period to progress outstanding reviews. 
Management competencies continue to be developed through Kings Fund training although this is suspended due to
Covid19.
Communications & Engagement Strategy was approved in November 2019 and is being implemented. 
Council and NHS performance systems in operation with HSCM reporting being further developed and information
relating to vacancies, turnover and staff absences is integral to this.  
Managers are highlighting any areas of concern and where appropriate this is identified in operational risk registers.
HSCM services have commenced weekly reporting of workforce sit reps for Senior Management Team oversight
highlighting vacancies, annual leave, sickness absence and Covid impacts so that issues can be identified and
assessed quickly.  
Mitigating
Actions: 
System re-design and transformation.  
Organisational Development Plan and Workforce plan were updated and approved by MIJB in November 2019. The
Workforce plan is currently being updated again and will be completed by September 2022.  These plans are core
documents for the Workforce Forum which has recently re-commenced following a temporary suspension during the first
quarter of this year due to Covid impact. 
Staff Wellbeing is a key focus and there are many initiatives being made available to all staff including training, support,
information and access to activities. 
Locality Managers are developing the Multi-disciplinary teams in their areas and some project officer support has been
provided to develop the locality planning model across Moray.
Page 74

Page 75

Appendix 1 
Lead Managers are involved in regional and national initiatives to ensure all learning is adopted to improve this position.
Lead Managers and Professional Leads are linked to University Planning for intakes and programmes for future
workforce development. 
Assurances: Operational oversight by Moray Workforce Forum has resumed and will report to MIJB in accordance with the agreed
Governance framework.
The HSCM Response Group was in place over the whole period of the Covid19 pandemic providing focussed
leadership around emerging issues and resolving them.  This group stood up again in April and is meeting daily whilst
the system is pressured, this will be reviewed as the situation evolves.  The Heads of Service are co-ordinating and
escalate to SMT where necessary.
Gaps in
assurance:
Further work required to develop workforce plans to reflect strategic plan implementation programmes once they are
agreed.
Current
performance:
The full IMatter surveys did not take place during 2020 however an IMatter pulse survey was undertaken in September
2020 to get a snap shot of what staff are feeling. Results were published 20 November 2020 and although there was a
lower response rate of the 36% the “working within the organisation satisfaction” score was 6.91 compared with 6.94 in
2019. The IMatter survey results for 2021 were received by managers for review and action plans.  Preparatory work is
commencing on the survey for IMatter 2022 
Discussions are underway with HR in both Council and NHS to develop access to appropriate HR information at a
summarised level to facilitate the necessary workforce planning and subsequent monitoring of plans. 
There continues to be a need for more streamlining in recruitment processes as the delay in approval to recruit to having
a member of staff available is in excess of 8 weeks. 
There is also a lack of suitable applicants for various posts which is impacting on ability to appoint for some roles. 
Comments: Staffing issues are owned by the Systems Leadership Group who will work collaboratively across the system to seek
opportunities to make jobs more attractive where it has proved difficult to recruit in the past.   
For some professions there is a potential risk that staff move from one position to a new position within HSCM will just
move the vacancy to elsewhere in the system, so Senior Management Team are aware of this risk and taking it into
account in considerations for vacancies. 
Page 75

Page 76

Appendix 1 
There is a concern that if there is a longer term continuing impact of Covid on system flow and beds continue to be
blocked for new patients it will mean operations cannot be scheduled to reduce the backlog and key staff may not have
the necessary time in surgery to maintain skills.   
4
Description of
Risk: 
Reputation:
Inability to demonstrate effective governance and effective communication and engagement with stakeholders. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high MEDIUM
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Locality planning assessed as medium in relation to ability to work at the pace required and current workforce capacity. 
Performance framework to be further developed from a planning perspective to show the links through operational
service delivery to strategic objectives. 
The Third Sector rep stood down from MIJB and the substitute was only able to commit to attending until August 2021. 
Efforts are underway to recruit a replacement for this role and for other forums and it is anticipated that an appointment
will be made for the 30 June 2022 meeting. 
Recent engagement with individuals representing their communities or third sector organisations in a variety of forums
is highlighting that problems with their capacity to fulfil our needs so more co-ordination and clearer focus is required to
ensure that the communication, engagement and outcomes are meeting identified needs.
Rationale for Risk
Appetite:
The Board is cautious but open about risks that could damage relationships with different stakeholders. It recognises
many of our aspirations depend on effective collaboration, coproduction and partnership working with a range of
stakeholders. The appetite also recognises that while the aspiration is to be a co-operative partner, some partners will
not be able to move at the same pace as us all the time. 
We will seek to protect relationships in the long term and will not set out to antagonise stakeholders deliberately. For
example, we must not be seen to exclude or prevent participation in the design of services where there is an appetite to
do this.  
Page 76

Page 77

Appendix 1 
We must be mindful that repairing relationships is easier when there is already a well of goodwill to draw on, and that
further damage to an already damaged relationship will not be conducive to good long term outcomes. 
Traditional methods of engagement are not possible at present as social distancing rules apply however alternative
mechanisms for engaging with stakeholders are being used along with social media 
Controls: Governance Framework approved by IJB January 2021
Communication and Engagement Strategy approved November 2019
Annual Governance statement produced as part of the Annual Accounts 2019/20 and submitted to External Audit. 
Annual Performance Report for 2019/20 was published in August 2020
Performance reporting mechanisms in place and being further developed through performance support team, home first
group and system leadership team.
Community engagement in place for key projects areas such as Forres, Keith and Lossiemouth with information being
made available to stakeholders and the wider public via HSCM website.
Participation of stakeholders in a variety of meetings such as Home First project, carer strategy, Strategic, Planning and
Commissioning groups.
Mitigating
Actions: 
Schedule of Committee meetings and development days in place and implemented. 
Good working relationship established with Audit Scotland, the MIJB’s appointed external auditors since 16/17. 
Annual Performance Report for 2020/21 published in August 2021.  
Social media is actively used as a method of engaging with the public, with short videos focussing on particular
services being trialled. 
SMT have considered the existing arrangements for engagement with stakeholders and work is being undertaken to
align our framework with the Scottish Government “Planning with people guidance” and ensure that mechanisms are in
place across services to evidence and evaluate their impact.
Assurances: Oversight and scrutiny by Clinical and Care Governance Committee, Audit Performance and Risk Committee and
MIJB.  
Summary reports of minutes of MIJB meetings are submitted to Council committee and NHS Board.
Gaps in
assurance:
Progress on implementation of the Communication and Engagement Strategy has been impacted by the Covid 19. 
Due to the impact of COVID and requirement for social distancing the normal mechanism for engagement were not all
available.  More use is being made of social media and Microsoft teams and other options and methods for
engagement with staff are being used via NHSG such as videos on YouTube and one question surveys. Going forward
there may be more opportunity for face to face meetings to take place again.
Page 77

Page 78

Appendix 1 
Current
performance:
Communications Strategy was reviewed approved by IJB November 2019.
Annual Performance Report 2020/21 published August 2021.  Audited Accounts for 2020/21 were publicised by
deadline 30 September 2021 
Due to Covid19 there have been increased levels of briefings to staff, the public and Chair/Vice Chair of MIJB with a
focus on the key elements of the response.  The staff newsletter commenced during Covid but will continue to be
produced. 
Comments: A communication cell was established as part of the Local Resilience Partnership Covid and storms response with
representation from Councils, HSCP and NHSG.  This was led by Aberdeen City Council and was an example of the
collaborative working that took place.  This forum provides assurance that messages to all stakeholders are consistent. 
It also ensures that there is support for our Communications Officer and resilience provided with the access to other
communication officers. 
There has been representation from the Home first project at the Wellbeing forum to facilitate sharing of information
and seeking views. 
5
Description of
Risk: 
Environmental:
Inability to cope with unforeseen external emergencies or incidents as a result of inadequate emergency and resilience
planning. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Due to the response requirements for Covid 19 progress has been made in a number of areas.  SMOC information is
updated, control room guidance updated and expanded, control centre protocols were implemented and remain in place
and management teams have responded in an agile, responsive and collaborative way under very challenging conditions. 
HSCM did not have a collectively approved list of critical functions at the start of the response however this was quickly
completed and used to prioritise allocation of resources to the response.  This list was reviewed in 2021 and managers
are working to a schedule to update for any further changes that have been implemented as a result of Omicron.
Page 78

Page 79

Appendix 1 
Covid infections continue in Moray however mitigations in place in accordance with Scottish Government guidance are
intended to assist services maintain core staffing levels and service delivery.  Teams continue to do their best but there
are areas where they still feeling overwhelmed and service delivery is restricted to core elements. 
With effect from March 2021 MIJB is defined as a Category 1 responder under the Civil Contingencies (Scotland) Act
and there are additional requirements for preparedness that is being taken forward in partnership with NHSG and Moray
Council emergency planners.
Rationale for Risk
Appetite:
The MIJB understand the requirement to meet the statutory obligations set out within the Civil Contingencies Act and
the Category 1 status applied in March 2021, and work with partner organisations to meet these obligations 
Controls: Winter Preparedness Plan was updated (but not tested as in previous years) alongside NHSG plans as NHSG
implemented their crisis management framework which required participation of partners at Daily connect meetings to
discuss and prioritise resource to address issues with system flow.
HSCM Civil Contingencies group established and meeting regularly to address priority subjects.
NHS Grampian Resilience Standards Action Plan approved (3 year).
Business Continuity Plans in place for most services although overdue a review in some areas.
Knowledge of critical functions and ability to respond quickly and effectively has been in evidence during incidents such
as Gas outages in Keith (January and February 2021) and Covid response, Storms (Arwen, Malik and Corrie) – debriefs
carried out and learning identified.
Debriefs being undertaken for HSCM, Moray (Council and HSCM) and Local Resilience Response with lessons learnt
being collated and prioritised for an action plan.
Mitigating
Actions: 
Information from the updated BIA/BCP informed elements of the Winter Preparedness Plan 
A Friday huddle is in place which gathers the status of services across the whole system to provide information and
contact details to the Senior Manager on Call (SMOC) over the weekend. 
NHSG have introduced system wide daily huddles to manage the flow and allocation of resources which require
attendance from Dr Grays and HSCM. 
NHS Grampian have amended their approach to Pandemic preparation so HSCM Pandemic plan will require redrafting
and testing.  This will be taken forward by HSCM Civil Contingencies Group. 
Practitioner group established for Moray with representation from HSCM, Dr Grays, Moray Council and NHSG to
discuss matters arising from the Local Resilience Forum and within our respective organisations.  In addition it will
provide a forum for discussion of the linkages between organisational response plans to ensure there are no gaps or
over reliance on particular local resources. 
Page 79

Page 80

Appendix 1 
HSCM continues to monitor the local situation regarding impacts on staffing and is engaged with NHSG emergency
planning arrangements and Council Response and Recovery management team to be ready to escalate response if
required. Work was undertaken within NHSG, Aberdeenshire HSCP and Aberdeen City HSCP to look at Surge flows
and establish a mechanism that will provide easy identification of “hot spots” across the whole system in Grampian, to
facilitate a collaborative approach to addressing the issues through the use of a common Operational Pressure
Escalation approach.  This work could underpin surge responses in winter and at other times of pressure and having a
standard approach across Grampian could aid communication and understanding.
Assurances: Audit, Performance and Risk Committee and NHS Grampian Civil Contingencies Group oversight and scrutiny.
HSCM Civil Contingencies group review specific risks and action plans to mitigate, developing plans and testing
arrangements in partnership with NHSG and Council
Gaps in
assurance:
The recent experience of Storms and associated power outages proved challenging for all category 1 responders across
Grampian however our staff responded extremely well.  The debriefs have identified lessons learnt for Grampian Local
Resilience Partnership and more locally for the response co-ordination within Moray.    Action plans have been developed
in collaboration with Moray Council’s emergency planning officer to address the issues identified.  The main issues related
to developing wider awareness of roles and responsibilities,   and improving general awareness of response structures
and meeting protocols.  This will be incorporated into training schedules going forward.  It has also highlighted the need
for a more robust arrangement for out of hours contact and clarity of roles and responsibilities across the system which
is being progressed through an organisational change steering group. 
Some table top exercises have been completed but the intended programme for 2020 is being rescheduled now we are
out of response phase. 
Progress has been made however further work is required to address the targets in the implementation plan that have
not been met and the Resilience standards as identified by the NHSG Civil Contingencies Group. 
Pandemic flu plans will require to be updated with the learning from Covid 19 
The debrief reports following the gas outages from a Moray perspective and the Grampian Local Resilience Partnership
(LRP), highlighted some issues for clarification in relation to the Care for People agenda.  To address the local issues
meetings have been taking place with Moray Council and HSCM representation to progress the Care for People plan and
associated response structures.  The Care for People group met in April and will meet again in June to review the draft
Care for People plan for sign off.  The intention is to hold a table top exercise with managers from HSCM and Moray
Council to test the invocation arrangements to ensure common understanding of roles and responsibilities.
Current
performance:
The Senior Management Team participated in Strategic Leadership in a Crisis training in 2020 and a programme of
further training for the wider management team is scheduled. 
Page 80

Page 81

Appendix 1 
Many services have business continuity arrangements and some are overdue for an update.  Work has progressed in
identification of a critical functions list for agreement by System Leadership Group that will inform planning
arrangements going forward.  There will need to be changes made to business continuity plans following the
implementation of additional ICT resources in services which have provided a greater deal of resilience for some
services and functions – albeit reliant on electricity supply.  A schedule of review and exercising of business impact
assessments and plans has been scheduled for this year across services. 
Annual report on progress against NHS resilience standards was reviewed by APR committee on 31 March 2022. 
Report on the implications of the designation as a Category 1 responder was presented to MIJB 25 November 2021. 
Information has been collated regarding dependencies of fuel for delivery of critical functions for submission to NHSG
and Council for inclusion in the planned response to the invocation of the National Fuel Plan. 
Comments: Once the response phase is complete the HSCM Civil Contingencies group will schedule and review progress in
achieving the NHSG resilience standards, reporting updates to System Leadership Group.  
Page 81

Page 82

Appendix 1 
6
Description of
Risk: 
Regulatory
Risk to MIJB decisions resulting in litigation/judicial review.  Expectations from external inspections are not met.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high MEDIUM
Risk Movement:  increase/decrease/no change INCREASING
Rationale for Risk
Rating: 
Considered medium risk due to the impact of Covid-19 and resultant efforts required to remobilise services and/or the
increase in workloads stretching a workforce that has been under sustained pressure for a considerable time. 
The impact of the current level of Covid positive staff is stretching resources to deliver care in the community across all
providers (internal and external) so there is a potential increased risk of expected standards not being achieved despite
the best efforts of all concerned.     
Rationale for Risk
Appetite: 
The Board, staff and providers across Moray are all committed to ensuring high standards of clinical care & governance
through operational policies.  Innovation and new ways of working may mean traditional regulations do not exist and
require to be developed, no longer apply, or are contradictory. 
We will only take regulatory risks knowingly, following consultation with the relevant regulatory body and where we have
clear risk mitigation in place. 
Controls: Clinical and Care Governance (CCG) Committee established and future reporting requirements identified
Clinical Risk Management and Practice Governance group has oversight of their respective professional standards and
feed into Clinical and Care Governance Group, which then escalates to CCG Committee as necessary.
High and Very High operational risks are reviewed by System Leadership Group monthly and a review of all risks will be
undertaken as part of the risk management framework. 
Complaints and compliments procedures in place and monitored.  A complaints co-ordinator role is being developed and
will be implemented to reduce duplication of effort, to provide co-ordination and improve information flow and support
managers in responses with the intention of streamlining processes and improving achievement of target timescales.  
Clinical incidents and risks are being reviewed on a weekly basis to ensure processes are followed appropriately and
consistently and responses are recorded in a timely manner.
Adverse events and duty of candour procedures in place and being actioned where appropriate and summary reports
submitted to CCG committee.
Page 82

Page 83

Appendix 1 
Reports from external inspections reported to appropriate operational groups and by exception to SMT for subsequent
reporting to CCG or Audit Performance and Risk Committee as appropriate, albeit there has been a reduction in some
areas of external inspection reporting during the Covid period due to social distancing restrictions 
Care Home Oversight Group was meeting daily but now three times a week to oversee and manage risks in care homes.
Children and Adult Protection services are being delivered and reported to their respective committee on a regular basis.
Mitigating
Actions: 
This risk is discussed regularly by the three North East Chief Officers. 
Additional resource has been allocated to support the analysis of information for presentation to CCG committee 
Process for sign off and monitoring actions arising from Internal and External audits has been agreed
Assurances: Audit, Performance and Risk and Clinical and Care Governance Sub-Committees oversight and scrutiny.
Governance Framework in place and operational. 
Gaps in
assurance:
Process for highlighting recurring themes or strategic expectations from external inspections requires further development
to ensure Committee has sight of significant issues. 
.  
Current
performance:
External inspection reports are reviewed and actions arising are allocated to officers for taking forward. 
A summary of inspections was included in the Annual Performance report.   
The level is marked as an increasing risk on the basis that services are under pressure with the issues with staffing
capacity and the need to focus on delivery of critical functions which may mean external inspection are not the priority
at this moment in time. 
The Adult Support Protection inspection took place in April/May and the findings are awaited. 
Comments: No major concerns have been identified for HSCM services in any audits or inspections during 2021/22.
The equipment store has received a follow up internal audit and the initial verbal feedback was positive.   
Page 83

Page 84

Appendix 1 
7
Description of
Risk: 
Operational
Continuity and
Performance:
Inability to achieve progress in relation to national Health and Wellbeing Outcomes.   
Performance of services falls below acceptable level.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Potential impacts to the wide range of services in NHS Grampian and Moray Council commissioned by the MIJB arising
from reductions in available staff resources as budgetary constraints impact. 
Unplanned admissions or delayed discharges place additional cost and capacity burdens on the service.   
The level of delayed discharges has come down slightly too averaging 36 in the last month, reflecting the sustained
pressure in the system as a result of Covid -19 impact and the lack of availability of care in the community.  There are
sustained focussed and collective efforts by all those working in the pathway.  However this is a complex area and will
require continued effort to realise reductions and maintain them.   
Rationale for Risk
Appetite: 
The Board is cautious but open about risks that could affect outcomes that are priorities for people in Moray. There is a
slightly higher appetite to risks that may mean nationally set outcomes – that by design are not given a high priority in
Moray - are not met. 
This will only be accepted where there is a clear rationale, and preferably also a way of demonstrating what the IJB is
doing to meet the aspiration the outcome was created for. 
Controls: Performance Management reporting framework. 
2019 to 2029 “Partners in Care” Strategic Plan approved and refresh of Plan and development of implementation Plans
underway.
Performance regularly reported to MIJB. Revised Scorecard being developed to align to the new strategic priorities.
Best practice elements from each body brought together to mitigate risks to MIJB’s objectives and outcomes.
Chief Officer and SMT managing workload pressures as part of budget process.
A daily dashboard of key indicators has been developed for HSCM and is circulated to service managers to ensure
shared understanding of the pressures in the system.  Work continues on  refinement of G-OPES (Grampian Operating
Page 84

Page 85

Appendix 1 
Pressures and Escalation System) led by NHSG but being developed locally to identify the triggers and resultant
actions required in services to respond to pressure points.
Mitigating
Actions: 
Service managers monitor performance regularly with their teams and escalate any issues to the System Leadership
Group (SLG) for further discussion to provide wider support, developing shared ownership and a greater understanding
across the whole system.   
Key operational performance data is collated and circulated daily to all managers.  A  Daily dashboard is held on
illuminate for managers to access to ensure any potential issues are identified quickly so action can be taken.  This
dashboard is being reviewed and will be further developed with the intention of further dashboards to provide a whole
system overview.  This has been discussed at SLG and agreed. 
Performance information is presented to the Performance sub group of Practice Governance Group to inform Social
Care managers of the trends in service demands so that resources can be allocated appropriately. 
Assurances: Audit, Performance and Risk Committee oversight. 
Operationally managed by service managers, summary reports to Practice Governance and clinical and care
governance group and to System Leadership Group.  Strategic direction provided by Senior Management Team. 
HSCM Response Group continues to meet and reviews the key performance information and actions that are required
to deliver the priority services.
Gaps in
assurance:
Development work in performance to establish clear links to describe the changes proposed by actions identified in the
Strategic Plan has recommenced but is at an early stage.  This will be progressed as the revised outcomes are
determined and associated KPI are identified.  Progress will be reported to future Board meetings. 
Current
performance:
Covid19 has impacted on all areas of the service and work is underway to take the learning and experience gained
during the response to collate performance information in dashboards to support mangers interpret the impact of
Covid19 on their services, now and going forward.
There are likely to be changes to ways of working and this may also have impact on the performance information
required. 
Comments: Locality profile information has been provided to Locality Steering Group/Locality Manager to inform potential priorities
for consideration in Localities and work will be taken forward regarding development of performance monitoring and
reporting of key performance indicators in relation to Localities once it has been determined what the intended
outcomes are.   
The delayed discharge group has produced an action plan for implementation and progress is being made.  
Page 85

Page 86

Appendix 1 
Practice Governance have reviewed their operational performance requirements and have a comprehensive data set
used to inform operational priorities.
The Home First priorities are being taken forward and updates are reported to this committee or MIJB on a regular
basis. 
Progress in this area has been hampered due to the increased demand for urgent or critical services requiring staff
resource to be prioritised to frontline service delivery. 
The Council has procured new modules for their performance reporting system Pentana and HSCM performance team
has been developing its its use for reporting. 
8
Description of
Risk: 
Transformation
Inability to progress with delivery of Strategic Objectives and Transformation projects. 
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
There are many issues that will impact on the ability to progress to deliver Strategic Objectives. 
The Strategic Planning & Commissioning group has been refreshed and re-launched and key work is being progressed. 
There was an initial meeting held on 22 September 2021 to consider terms of reference and the proposed structure for
oversight, prioritisation and assurance in relation to key developments, their fit with IJB strategy and enabling elements. 
The interim appointment of the Strategic Planning Lead provides capacity to take this forward and to align the priorities
arising nationally, Grampian-wide and locally. 
The remobilisation plan for HSCM services that were suspended or reduced is progressing with Providers services and
social work implementing the IJB decision to return to delivery of both substantial and critical eligibility criteria.  Work has
progressed risk assessments are completed and assessments have been or are in the process of being reviewed to
ensure equality.  There are still some restrictions of social distancing on some services mean that capacity for services
is impacted.  There are some tests of change underway with a focus on delivery of individual outcomes which may mean
service users receiving a different type of service (after discussion and agreement) which will meet their defined
outcomes. It is anticipated that a hybrid service will be offered which will facilitate tailoring of services to meet specific
individual outcomes where this is appropriate.  
Page 86

Page 87

Appendix 1 
The time period and extent of Covid 19 the impact on the population of Moray will not be fully understood until well after
the response is over.  It is therefore not possible to predict the extent of the impact on the ability to progress with delivery
of Strategic Objectives.  There are some aspects that have progressed very well such as introduction of Near Me
consultations but there are others that are more difficult to progress. 
There is concern that due to the workloads and challenges over the last year that teams are weary and/or do not have
capacity at this moment in time, to progress with delivery of development plans at this moment in time.  In addition the
pandemic is still present in the community so services are still responding to the impacts it has for the population of
Moray.  Managers are working with teams to establish “readiness” and their capacity and sense of wellbeing and the
collated output will inform plans going forward. 
One key aspect to facilitate transformation is the need for progress in relation to ICT infrastructure, data sharing and data
security across the whole system.   Work was undertaken by NHS GRAMPIAN and partners to address the needs for
ICT kit and  information during the response to Covid and it is hoped that this progress can be built on 
Rationale for Risk
Appetite:
The Board has a high appetite for risks associated with delivery of transformational redesign. The following should be
considered when accepting these risks:
• We understand and can mitigate other risk types that may arise, e.g. safety or financial within appetite 
• Service users are consulted and informed of changes in an open & transparent way 
• We will monitor the outcome and change course if necessary   
Controls: Home First strategic theme is being progressed across the whole system and a local Home First Group is meeting
monthly.    A newsletter is being produced to keep staff and partners informed. 
It is recognised that there will be significant changes taking place in Social Work practice with the implementation of the
Self Directed Support standards and the move to outcomes based services, so governance arrangements are being set
up to facilitate the same type of oversight and communication that is in place for the Home First programme.
Mitigating
Actions: 
Integrated Infrastructure Group previously established, with ICT representation from NHSG and Moray Council, to
consider and provide solutions to data sharing issues and ICT infrastructure matters which is an area that will be taken
forward alongside the Moray Growth Deal projects.  Linkages to Infrastructure board and Information sharing groups
have been established albeit these meetings are not taking place regularly at the moment. 
Data sharing groups for Grampian and Health and Social Care Moray have been established and meetings were held
regularly but have not taken place for several months due to Covid.  These meetings have oversight of any issues
arising from Data protection and GDPR matters from either Council or NHS systems.  It is anticipated that these will
restart during the next quarter.
Page 87

Page 88

Appendix 1 
Assurances: Strict ICT and data sharing policies and protocols in place with NHS Grampian and Moray Council. 
Gaps in
assurance:
Transformation/implementation planning is in development and will inform outcomes and performance reporting on the
delivery of the strategic plan. 
Protocol for access to systems by employees of partner bodies are in place.
Information Management arrangements to be developed and endorsed by MIJB.
Process of identification of issue and submission to data sharing group requires to be reinforced to ensure matters are
progressed. 
Hybrid working arrangements and preparation of offices for return require to be progressed in partnership with Council
and NHSG.
Current
performance:
Training programme to be developed on records management, data protection and related issues for staff working
across and between partners.  
Comments: Where national systems are involved it may not be possible to identify a solution however the issues will be able to be
raised at the appropriate level via the Grampian Data Sharing Group where all three partnerships are represented. 
Page 88

Page 89

Appendix 1 
9
Description of
Risk: 
Infrastructure
Requirements for support services are not prioritised by NHS Grampian and Moray Council.
Lead: Chief Officer
Risk Rating:  low/medium/high/very high HIGH
Risk Movement:  increase/decrease/no change NO CHANGE
Rationale for Risk
Rating: 
Changes to processes and necessary stakeholder buy-in still bedding in. 
Moray Council is undertaking a Property review of office and depot accommodation and the potential impact for HSCM
services requires consideration.  The output was anticipated in October 2019 however due to changes with roles and
responsibilities within the Council however the paper has been out for consultation.  The changes required to places of
work as a result of Covid19 continue to restrict the number of people that can use an office.  These decisions are being
made by NHSG and Moray Council and we await their development of policy regarding workspace and availability of
facilities going forward as highlighted in the Premises Strategy report to MIJB in May 2021.  NHSG have advised that
staff should continue to work from home at present whilst policies and protocols are developed.  Moray Council are
promoting a hybrid method of working and are limiting occupancy in offices at present to 50% of desk capacity. 
ICT infrastructure service plans in NHS Grampian and Moray Council are not yet visible to HSCM and development of
communication and engagement process is required. 
The impact of Covid has resulted in a change in ICT strategy for Moray Council.  Council employed staff requiring mobile
technology have now been provided with it and many staff are working from home.  This is a necessity where the number
of desks available in offices has been reduced due to implementation of social distancing guidance. 
There is still an issue with availability of kit for NHS employed staff which has been escalated 
There are some significant risks in relation to accommodation for services on operational risk registers which are taking
longer than would be ideal to resolve. 
Rationale for Risk
Appetite: 
Low tolerance in relation to not meeting requirements.
Controls: Chief Officer has regular meetings with partners
Computer Use Policies and HR policies in place for NHS and Moray Council and staff are required (through and
automated process) to confirm they have read these every 6 months
Page 89

Page 90

Appendix 1 
PSN accreditation secured by Moray Council 
Infrastructure Programme Board was established with Chief Officer as Senior Responsible Officer/Chief Officer
member of CMT. Process for submission of projects to the infrastructure board approved and implemented to ensure
appropriate oversight of all projects underway in HSCM.  The Board is not meeting at present, so in the interim, project
requests are being processed via Senior Management Team. 
Mitigating
Actions: 
Membership of the Board was reviewed and revised to ensure representation of all existing infrastructure processes and
funding opportunities.
Process for ensuring infrastructure change/investment requests developed
Interim Infrastructure Manager in post and linking into other Infrastructure groups within NHSG & Moray Council to
ensure level of ‘gatekeeping’.
Dr Gray’s site development plan is being produced collaboratively with input from NHSG and HSCM management
Work is progressing on identification of needs for some services with regard to accommodation which will be
communicated with partners to find the most effective solution.  
Assurances: Infrastructure Programme Board functions to provide robust governance and assurance that proposed projects have a
robust business case and meets requirements of the respective partner organisations.  This board reports to Strategic
Planning and Commissioning Group.  Both of these groups are being refreshed and remobilised. 
Workforce Forum meeting regularly with representation of HR and unions from both partner organisations 
Gaps in
assurance:
Further work is required on developing the process for approval for projects so that they are progressed timeously.
Need to review all existing processes in relation to infrastructure changes/projects/investments and streamline to avoid
duplication of effort. 
Infrastructure Board is in development and priority issues are being addressed in relation to infrastructure and premises
risk. 
Legal services have reduced capacity to provide support due to budget cuts so any requests may take longer. 
Recruitment for vacancies takes considerable time due to various factors and is presenting a strain on services to maintain
normal service whilst covering vacancies.  There have been several posts that have had to go out to advert more than
once extending the time other staff are covering gaps.
Page 90

Page 91

Appendix 1 
Current
performance:
The Infrastructure Board is currently suspended.  Its purpose is for highlights/exceptions to be taken to SLG for
communication and information purposes.   
Access to support for development of HSCM priorities is difficult at time because projects/requests are prioritised against
all other services in the partner organisations.  The challenges and impact on the ability to adopt efficient working
processes for HSCM staff and managers whilst have to use networks/systems from two organisations, which cannot be
accessed by all members of teams due to data sharing, matters is very significant. 
Comments: Existing projects will be reviewed as part of the development of the transformation plans for the Strategic Plan to
ensure resources are being dedicated appropriately and aligned to the emerging Strategic priorities.  Our requirements
for support will be communicated via appropriate channels 
There remains issues with access to ICT equipment for staff with orders over 6 months old outstanding with both NHSG
and Moray Council.  This impacts on services effectiveness.  The matter has been escalated by senior managers with
colleagues in the partner organisations. 
Page 91

Page 92

Page 92

Page 93

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 30 JUNE 2022 
SUBJECT: INTERNAL AUDIT ANNUAL REPORT – 2021/22 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 This report provides the Audit, Performance and Risk Committee with details
of internal audit work undertaken relative to the Moray Integration Joint Board
(MIJB) for the financial year ended 31 March 2022, and the assurances
available on which to base the internal audit opinion on the adequacy of the
MIJB’s systems of internal control. 
2. RECOMMENDATION 
2.1  The Audit, Performance and Risk Committee is asked to consider and
note the contents of the annual report given as Appendix 1 to this
report. 
3.  BACKGROUND 
3.1 The purpose of this report is to present the Audit, Performance and Risk
Committee with the Internal Audit Annual Report for the year to 31 March
2022 which includes the Chief Internal Auditor’s independent assurance
opinion on the adequacy of the MIJB’s systems of internal control.  
3.2  The Public Sector Internal Audit Standards (PSIAS) require that the Chief
Audit Executive (CAE), the MIJB’s Chief Internal Auditor, to provide an annual
internal audit opinion and report on the adequacy and effectiveness of the
MIJB’s systems of governance, risk management and internal controls to
support the preparation of the Annual Governance Statement. This is in
support of the overall governance arrangements of the MIJB. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The report covers the year to 31st March 2022 and is provided as Appendix
1. 
Item 8.
Page 93

Page 94

5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Moray
Partners in Care 2019 – 2029”
Internal audit work supports good governance and assists in securing
appropriate systems of internal control. 
(b) Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications
No implications directly arising from this report. 
(d) Risk Implications
No direct implications. 
(e) Staffing Implications
No implications directly arising from this report 
(f)  Property
No implications. 
(g) Equalities/ Socio Economic Impacts
No implications. 
(h) Climate Change and Biodiversity Impacts
No implications. 
(i) Directions
There are no directions arising as a result of this report 
(j)  Consultations
There have been no direct consultations during the preparation of this
report. 
6. CONCLUSION 
6.1 This report provides a summary overview of the nature and extent of
audit work carried out during the year, and informs the annual internal
audit opinion on the internal control environment operating within the
MIJB. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor 
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/30062022
Page 94

Page 95

APPENDIX 1 
INTERNAL AUDIT
ANNUAL REPORT and OPINION 
1 APRIL 2021 to 31 MARCH 2022 
Item 8.
Page 95

Page 96

2 | P a g e
CONTENTS 
PAGE
SECTION 1 INTRODUCTION 3
SECTION 2 BASIS OF OPINION 4
SECTION 3 SUMMARY AND LIMITATIONS OF WORK THAT
SUPPORTS OPINION
4 - 6
SECTION 4 OPINION 7 
Page 96

Page 97

3 | P a g e
SECTION 1 – INTRODUCTION 
Purpose of this report 
Public Sector Internal Audit Standards (PSIAS) requires that the Chief Internal Auditor
provide a written statement to inform the Annual Governance Statement. This report
constitutes the required statement. As required by PSIAS, this report presents the
opinion on the overall adequacy and effectiveness of the Moray Integration Joint
Board (MIJB) risk management, control and governance processes based on the work
Internal Audit has performed. In addition, my evaluation will also include an
assessment of reports issued by other review agencies. The scope of Internal Audit
work, the responsibilities of Internal Audit and the assurance given on the adequacy
and effectiveness of the Internal Control System of the MIJB are explained further in
Section 4 of this report. 
Responsibilities of Management and Internal Audit 
It is management’s responsibility to maintain systems of risk management, internal
control and governance. Internal Audit is an element of the internal control framework
established by management to examine, evaluate and report on accounting and other
controls over operations. Internal Audit assists management in the effective discharge
of its responsibilities and functions by examining and evaluating controls. Internal
Audit cannot be held responsible for internal control failures.
Internal Audit’s role includes assessing the adequacy of the risk management, internal
controls and governance arrangements put in place by management and performing
testing on a sample of transactions to ensure those controls were operating for the
period under review. The responsibility for providing the Internal Audit Service to the
MIJB is by the Moray Council’s Internal Audi Section. However reliance is also obtained
from the Internal Audit Service Provider for NHS Grampian to support the annual
internal opinion on the MIJB’s internal control environment 
Public Sector Internal Audit Standards (PSIAS) require officers of the Internal Audit
Section to communicate on a timely basis all facts and matters that may have a
bearing on their independence. I can confirm that all staff members involved in
2021/22 internal audit reviews were independent of operational processes and their
objectivity was not compromised in any way. 
Page 97

Page 98

4 | P a g e
SECTION 2 –BASIS OF OPINION 
My evaluation on the adequacy and effectiveness of the MIJB framework of
governance, risk management and internal control is based on the following; 
• The audit work undertaken by Internal Audit during the year to 31 March 2022.   
• The governance statement signed by the Chief Officer of the MIJB for the year
ended 31 March 2022. 
• Reports issued by the MIJB’s External Auditor, Audit Scotland, and other
external review agencies. 
• My knowledge of the MIJB’s governance, risk management and performance
monitoring arrangements. 
Assurance is also based on the wider audit work conducted by the Chief Internal
Auditor in his capacity as the Audit and Risk Manager of the Moray Council and from
an annual internal audit report prepared for Grampian Health Board providing an
opinion on the adequacy and effectiveness of its system of internal control. 
SECTION 3- SUMMARY AND LIMITATIONS OF WORK THAT SUPPORTS THE
OPINION  
Progress on the 2021/22 internal Audit Plan 
Internal Audit operates independently within the organisation. While there may have
been limitations in the scope of the audit due to the pandemic, there have been no
limitations imposed by management on the scope of audit work performed. The
Annual Audit Plan presented to the Audit, Performance and Risk Committee
describes in some detail the framework around which audit work is developed. In
addition, the selection of audit topics was selected having regard to corporate
planning documents, budget data and information drawn from the corporate risk
register, and takes into account input from senior management regarding possible
areas for audit.  
The internal audit work has been conducted in accordance with an established
methodology that promotes quality and conformance with the Public Sector Internal
Audit Standards and the agreed Internal Audit Annual Audit Plan. 
A summary of the audit projects from MIJB Audit Plan is summarised as follows: 
Page 98

Page 99

5 | P a g e
• An audit was undertaken into the financial monitoring arrangements within the Self
Directed Support Team for direct payments made to service users. The audit has
checked for effective procedures in the monitoring of funds issued to service users.
This involved the random selection of a sample of care packages and a check made
to ensure compliance with operating procedures, expenditure incurred by the service
users are in accordance with the agreed budget and support plans and surplus funds
are recovered from service users where appropriate. 
• The audit found several areas where further improvements are required to current
operating arrangements with a need to review all service user care packages to
recover any excess funds. It is appreciated that staff resources have been diverted to
support Covid related activities and the focus has been on supporting direct payment
recipients, employers and personal assistants to ensure essential care has continued
to be delivered. 
• An audit was undertaken into how Health and Social Care Officers manage income
held for individuals under Corporate Appointeeship Arrangements.  Where an
individual is assessed as requiring assistance in the financial management of benefits
received, an application can be made to the Department for Work and Pensions
(DWP) in order for Social Work Officers to become the 'Corporate Appointee' and
have legal authority for administering this income. 
• The audit involved a review of the procedures undertaken by the Community Care
Finance Team into how they manage client funds held within the corporate bank
account. In addition, a sample of individuals was also selected, and a check was
made on how officers appointed as the named 'Corporate Appointee' manages and
support individuals to access and use their funds appropriately. The audit found that
overall, the service was being administered well, but findings were noted, including a
need to review cash handling procedures, further management overview of the
corporate bank account reconciliation process.       
• A review has also been undertaken of creditor payments made within 2021/22. The
use of an audit software interrogation system called IDEA was used to randomly select
a sample of payments to check. The purpose of the audit was to confirm ongoing
compliance with procurement and payment processing regulations. A check was also
made for duplicate payments by extracting listings where more than one invoice from
a single supplier has been paid for the same amount. From the sample checked, no
issues were noted for reporting. 
• The impact of the pandemic has affected the Internal Audit Service in that officers
have been working from home with a need to change established working practices
and make greater use of audio, video and screen sharing software applications. These
changes in working practices have brought challenges, however the implementation
of an Internal Audit Software Application has assisted to ensure consistent working
practices with the ability to review working papers online. The Service has also had
several staff vacancies during the year. However, moving forward all positions have
now been filled. 
Unfortunately, due to the limitations detailed and an unplanned audit project it has
not been possible to complete a review of the Moray Council’s arrangements to
safeguard systems and services from a Cyber Security attack. Due to the importance
of this topic, it has also been included within the Moray Council’s Audit Plan for
2022/23.  
Page 99

Page 100

6 | P a g e
Governance - from a review of the annual governance statement prepared for
inclusion with the MIJB accounts, it was noted that the statement had been prepared
in line with good practice guidance issued by CIPFA / SOLACE. The statement
included an assessment of the effectiveness of governance arrangements within the
MIJB in terms of the seven principles of good governance identified within the
guidance. It also referenced the governance processes of the principal partner bodies
(NHS Grampian and Moray Council) as sources of additional assurance. Delivery of
services has continued in addition to meeting the significant challenges from the
current pandemic. 
A review of the annual report from the Moray Council’s Chief Social Work Officer noted
a number of governance arrangements in place to ensure effective service delivery.
The quality of social work services is assured by Practice Governance meetings. Any
issues are reported to the Clinical & Care Governance Committee of the MIJB for
adults. Posts of Consultant Social Work Practitioner are well established in adult
services and also now in children’s services. Consultants work with line managers to
support social work in complex cases, model best practices and set practice standards
in their respective areas. Consultants also undertake practice audits in Adult Social
Work. 
A report to the Audit, Performance and Risk Committee on the 31st of March detailed
the outcome of a review of the Health and Social Care Moray Commissioning Service
into how social care contracts are currently managed. This was a “peer” review led by
the Strategic Procurement Manager (Social Care) of Aberdeen City and Aberdeenshire
Councils. The report has highlighted a number of significant concerns about how social
care contracts are managed. The Audit, Performance and Risk Committee have
agreed for an external organisation to undertake a review of the Commissioning
Service. As the Chief Internal Auditor, I am concerned and will closely monitor progress
regarding this issue. 
Risk Management - procedures are well developed with a risk management policy
and strategy in place, a risk appetite statement has been developed and a risk register
reviewed and updated at regular intervals. The recently updated Risk Register
summarises the principal risks facing the organisation under nine themes; these
themes focus on critical risk areas including finance, environment and operational
continuity, together with transformation risks associated with change, and
infrastructure risks given the reliance of the IJB on support from both the Council and
the NHS. 
Statement on Conformance with the Public Sector Internal Audit Standards 
The Local Authority Accounts (Scotland) Regulations 2014 require public bodies to
operate a professional and objective internal auditing service in accordance with
recognised standards and practices in relation to internal auditing, the Public Sector
Internal Audit Standards
The Scottish Local Authorities Chief Internal Auditors’ Group, comprising the audit
managers or equivalent of all Scottish Councils, has developed a checklist for
assessing conformance with the Standards. This supports the requirement for self-
assessments and external assessments as part of Internal Audit’s Quality Assurance
and Improvement Programme. Internal monitoring of performance against the
Standards will continue on an ongoing basis until the next External Quality
Assessment, scheduled for 2023 is completed. However, a more structured quality
self-assessment is planned to highlight any issues arising from changing working
practices and service delivery due to the pandemic.  Page 100

Page 101

7 | P a g e
SECTION 4 – OPINION 
Any system of control can only ever provide reasonable and not absolute assurances
that control weaknesses or irregularities do not exist or that there is no risk of error,
fraud, or breaches of laws or regulations. Furthermore, it is the responsibility of
management to establish an appropriate and sound system of internal control and
monitor the effectiveness of that system. It is the responsibility of the Chief Internal
Auditor to provide an annual assessment of the robustness of the internal control
system.
The provision of this annual assessment and opinion has had regard to the
consequences of the pandemic relative to service disruption and disruption to the
Internal Audit Section from staff vacancies and officers working from home. The effect
of these impacts was to reduce the outputs of the Internal Audit Section, although
setting this in context, any restrictions applying were not considered material in terms
of affecting the audit opinion when assessed alongside governance practices
referenced throughout this report and the controls assurances provided separately
by NHS Grampian and Moray Council. (Assurance was obtained in the interim form
at the time of drafting this report from the Internal Audit Provider of Grampian NHS).
After consideration to the results of the work carried out by Internal Audit, taken
together with other sources of assurance, with specific reference to the peer review
into how the Commissioning Service manages social care contracts; it is my opinion
that I can only provide limited assurance that the Moray Integration Joint Board has
adequate systems of governance and internal control. 
Dafydd Lewis
Chief Internal Auditor
26 May 2022