Audit, Performance and Risk Committee 
Wednesday, 29 October 2025 
Council Chambers 
NOTICE IS HEREBY GIVEN that a Meeting of the Audit, Performance and Risk
Committee, Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Wednesday, 29 October 2025 at 14:00 to consider the business noted below. 
AGENDA 
1. Welcome and Apologies 
2. Declaration of Member's Interests 
3. Minute of meeting of 19 June 2025 5 - 10
4. Action Log of 19 June 2025 11 - 12
5. Quarter 1 (April to June 2025) Performance Report - Adult
Services
13 - 46
6. Quarter 1 (April to June 2025) Performance Report for
Children and Families and Justice Social Work
47 - 84
7. Internal Audit Section - Update Report 85 - 92
8. Internal Audit Section Completed Projects Report 93 - 128
9. Update on the Delivery of the Unpaid Carers Strategy 129 - 134
Page 1

Page 2

10. External Auditors' Report to those charged with
Governance
135 - 206
11. 2024-25 Audited Annual Accounts 207 - 276
12. Public Sector Internal Audit Standards - External Quality
Assessment of the Internal Audit Section - Follow Up
Review
277 - 298
13. Health and Social Care Moray Strategic Delivery Plan
2025-2028 - Progress Update to 30 September 2025
299 - 338
14. Items for Escalation to MIJB 
Item(s) which the Committee may wish to consider with
the Press and Public excluded   
15. CONFIDENTIAL Internal Audit Section Follow Up Review -
NHS Grampian
• 8 & 9. Information on proposed terms and/or expenditure to be
incurred by the Authority; 
16. CONFIDENTIAL Internal Audit Follow Up Reviews -
Information Communication and Technology
• 8 & 9. Information on proposed terms and/or expenditure to be
incurred by the Authority; 
Page 2

Page 3

MORAY INTEGRATION JOINT BOARD 
SEDERUNT 
Councillor Ben Williams  (Chair)  
Councillor Scott Lawrence  (Voting Member)
Mr Derick Murray  (Voting Member)
Mr Sean Coady  (Member)
Ms Sonya Duncan  (Member)
Ms  Aimee McIntosh  (Member)
Ms Deborah O'Shea  (Member)
Ms Judith Proctor  (Member)
Mr Sandy Riddell  (Member)  
Mr Michael Ritchie  (Non-Voting Member) 
Clerk Name: Caroline O'Connor
Clerk Telephone: 07779 999296
Clerk Email: committee.services@moray.gov.uk 
Page 3

Page 4

Page 4

Page 5

MINUTE OF MEETING OF THE AUDIT, PERFORMANCE AND RISK COMMITTEE 
Thursday, 19 June 2025 
Council Chambers, Council Office, High Street, Elgin, IV30 1BX 
PRESENT 
Mr Sean Coady, Ms Sonya Duncan, Councillor Scott Lawrence, Mr Derick Murray, Ms
Deborah O'Shea, Ms Judith Proctor, Mr Sandy Riddell, Councillor Ben Williams 
APOLOGIES 
Ms Deirdre McIntyre 
IN ATTENDANCE 
Interim Chief Social Work Officer/Head of Service; Chief Internal Auditor; Iain
Macdonald, Deputy Head of Service; Corporate Programme Manager; Angela Pieri,
Engagement Lead, Grant Thornton and Caroline O'Connor, Committee Services
Officer  
ALSO IN ATTENDANCE
Councillor Tracy Colyer 
1.         Chair 
The meeting was chaired by Mr Sandy Riddell.  
2.         Declaration of Member's Interests 
The Committee noted there were no declarations of member's interests.  
3.         Minute of meeting of 27 March 2025 
The minute of the meeting of 27 March 2025 was submitted and approved.  
4.         Action Log of 27 March 2025 
Item 3.
Page 5

Page 6

The Action Log of the meeting of 27 March 2025 was discussed and updated
accordingly.  
5.         Quarter 4 (January - March 2025) Performance Report - Adult Services 
The meeting had before it a report by the Corporate Programme Manager updating the
Committee on performance as at Quarter 4 2025 (January to March).  
With reference to the pressures outlined in paragraph 5.5 on adult mental health and
primary care psychological therapies, Councillor Lawrence firstly asked for a breakdown
of areas of pressures and whether issues such as the increasing numbers of adults
waiting assessment for Attention Deficit Hyperactivity Disorder (ADHD) were
contributing to the increased pressures; and secondly, what effect the Certificate of
Equivalence for Specialist Registration (CESR) Fellowship was having to reduce waiting
times.   In response, the Deputy Head of Service advised currently the main pressure
point was self referral into primary care however, as a result of targeted work undertaken
over the last 6 months relating to referral routes and more appropriate signposting for
people, the average wait time had reduced from 40 weeks to 20 weeks in the last quarter
and was confident the adjustments would result in further improvements.  He further
advised the benefits in relation to CESR Fellowship were wide reaching across the whole
system however there were significant benefits being realised within adult services. 
In response to a question from Councillor Lawrence asking whether long term vacancies
were a factor in the staff sickness levels referenced in terms of increased pressure
referred to in paragraphs 5.6 and 5.7, the Chief Officer confirmed this was a a
contributing factor which management attempt to manage by reviewing processes and
providing support within resources. She further advised of ongoing work within the
partnership and Council on how to strengthen support for managers to proactively
manage absence.  
In response to a question from Mr Riddell asking when it was anticipated the Mental
Health Bed Based Review would be delivered noting the potential implications for
Moray, the Deputy Chief advised Priority 6 of the review focusses on Moray and the first
meeting of the Working Group relating to that priority was to be held later that day from
which a timeline would be prepared on options, likely to take approximately 6 months,
which would then be presented to the Moray Integration Joint Board for approval.       
Following consideration the Committee unanimously agreed to:-  
(i) note the performance of local indicators for Quarter 4 (January to March 2025) as
presented in the Performance Report at Appendix 1; 
(ii) note the analysis of indicators that have been highlighted and actions being
undertaken to address performance that is outside of acceptable target ranges as
detailed in Appendix 1; 
(iii) note the revised format of this report, which will continue to evolve in future
reporting periods noting that different service areas may be highlighted within
each report, or as requested by the Board; and 
Page 6

Page 7

(iv) note the inclusion of supplementary service information in Appendix 1, which
provides additional context and evidence to support the mitigations outlined in
relation to the national outcomes.  
6.         Quarter 4 (January to March 2025) Performance Report for Children and
Families and Justice Social Work 
The meeting had before it a report by the Interim Chief Social Work Officer / Head of
Service informing the Committee on Children and Families and Justice Social Work
performance as at Quarter 4 (January to March 2025).  
Mr Murray asked for the reasons for the increase in numbers of Out of Area Placements
referenced in Graph 20 of Appendix 1.  In response, the Interim Chief Social Work Officer
advised all attempts are made to keep families together and wherever possible this is
facilitated within Moray however, internal foster care provision was at maximum
capacity as a result of significant challenges with the permanence planning process.  He
further advised a range of measures were being considered including the potential for
transitional funding to be agreed by the Council to address the particular issues. 
Following consideration the Committee unanimously agreed to:-  
(i) note the performance of local indicators for Quarter 4 as presented in the
Performance Report at Appendix 1; and 
(ii) note the analysis of the local indicators as detailed in Appendix 1.  
7.         Internal Audit Section - Update Report 
The meeting had before it a report by the Chief Internal Auditor providing Committee
with an update on the work of the Internal Audit Section.  
Mr Murray, appreciating the reasons provided by the Audit and Risk Manager in relation
to his limited assurance opinion on the adequacy of the Board's governance
arrangements, sought clarification how close the Board were to achieving reasonable
assurance.  In response, the Audit and Risk Manager advised his opinion was evidence
based in respect of audit reviews undertaken and progression of audit
recommendations by services.  He confirmed the following years’ opinion would be
based on the evidence at that time but stated work was required to ensure a closer
working relationship within the NHS on what the Board feed back to NHS Grampian and
their auditors to enable a more coordinated approach and allow an overarching view to
be taken.      
In order to provide assurance, the Chief Officer confirmed the senior management team
and operational management team were working to ensure there was clarity in terms of
the reasons for incomplete audit actions and revised implementation deadlines.   She
confirmed the team would be working closely with Internal Audit to focus future audits
on areas where there and challenges and to ensure recommendations were
implementable in terms of both timescale and resource.  
Following consideration the Committee unanimously agreed to note the audit update.  
Page 7

Page 8

8.         Internal Audit Annual Report - 2024-25 
The meeting had before it a report by the Chief Internal Auditor providing Committee
with details of internal audit work undertaken relative to the Moray Integration Joint
Board (MIJB) for the financial year ended 31 March 2025, and the assurances available
on which to base the internal audit opinion on the adequacy of the MIJB's systems of
internal control.  
Following consideration the Committee unanimously agreed to note the contents of the
annual report given as Appendix 1.  
9.         Unaudited Annual Accounts 
The meeting had before it a report by the Chief Financial Officer informing the
Committee of the Unaudited Annual Accounts of the Moray Integration Joint Board
(MIJB) for the year ended 31 March 2025.  
In introducing the report, the Chief Financial Officer apologised for an error in paragraph
4.3 noting the figures in the paragraph had been amended to reflect the amended
Asylum Seekers Grant of £701,000 which should have been classed as a grant carried
forward rather than being included in ear marked reserves and, while the Reserves figure
had been updated in the report, the sentence "this increase is primarily due to transfer
of reserves from Moray Council to MIJB relating to Asylum Seekers granted during the
year" should have been removed from the paragraph. 
Following consideration the Committee unanimously agreed to:-  
(i) note the unaudited Annual Accounts and recommend approval to the MIJB to be
submitted to the external auditor, noting that all figures remain subject to audit, in
Appendix 1; 
(ii) note the Annual Governance Statement contained within the unaudited Annual
Accounts and in Appendix 3; 
(iii) note the accounting policies applied in the production of the unaudited Annual
Accounts, pages 47 to 48 of the accounts; and 
(iv) approve the updated Local Code of Corporate Governance which supports the
Annual Governance Statement, in Appendix 2.  
10.         Annual Performance Report 2024-25 
The meeting had before it a report by the Chief Officer presenting the Committee with
the draft Annual Performance Report 2024/25.  
Following consideration the Committee unanimously agreed to:-  
(i) note the draft Annual Performance Report 2024/25 at Appendix 1; 
(ii) note the national indicator 11-19 information will be updated and approved by the
Chair and Vice Chair of the Board prior to publication; and 
Page 8

Page 9

(iii) recommend to the Moray Integration Joint Board for approval and publication of
the Annual Performance Report 2024/25 by 31 July 2025.  
11.         Development Sessions in November 2024 for Children Families and Justice
Social Work 
The meeting had before it a report by the Interim Chief Social Work Officer / Head of
Service informing Committee of the Development Sessions undertaken by Children and
Families and Justice Social Work in November 2024 and the resulting actions to address
learning from social work practice.  
Following consideration the Committee unanimously agreed to:-  
(i) note the activity and outcomes related to the Development Sessions in 2024; 
(ii) note the content of the Improvement Plan at Appendix 3; and 
(iii) agree an update on progress of the Action Plan will be provided to a future
Committee meeting.  
12.         Internal Audit Section Update Report - NHS Grampian Internal Audit Review
[Para 6.2.5] 
The meeting had before it a report by the Chief Internal Auditor providing an update to
Committee on the internal audit work completed on NHS Grampian systems and
practices.  
Following consideration the Committee unanimously agreed to note the audit update.   
13.         Update on Improvement Plan for Adult Social Care Commissioning [Para
6.2.2] 
The meeting had before it a report by the Interim Chief Social Work Officer / Head of
Service updating the Committee of progress on the Improvement Plan for Adult Social
Care Commissioning.  
Following consideration the Committee unanimously agreed:-  
(i) to note the progress of the Improvement Plan attached at Appendix 1; 
(ii) to note the progress within this report as at the end of March 2025 regarding the
recommendations detailed in the Improvement Plan; and 
(iii) that future reporting on this work will be submitted to the Moray Integration Joint
Board annually, considering that there will be an internal reporting to evidence the
implementation of the recommendations detailed within the KPMG Adult Social
Care Commissioning review.   
Page 9

Page 10

Page 10

Page 11

MEETING OF MORAY INTEGRATION JOINT BOARD 
AUDIT, PERFORMANCE AND RISK COMMITTEE 
THURSDAY 19 JUNE 2025 
ACTION LOG 
Item
No.
Title of Report Action Required Due Date Action By Update for 
29 October 2025
1.  Q1 Performance
Report
Information to be provided about the support
that is on offer to staff to help improve their
wellbeing.
27 June 2024 Sean
Coady/
Natalie
Jeffrey
Due to new template
from Scottish
Government, new
HSCM H&S Delivery
Plan and Workforce
Delivery Plan now
scheduled for later
2025. 
2.  Q2 Performance
Report
Chief Officer to issue email update with
information relating to the rise in targets
detailed in Emergency Admissions graphs in
Appendix 1. 
TBC Chief Officer Targets are being
amended. Members
will be emailed with
background
information detailing
how targets are
calculated.
3.  Q3 (Oct-Dec
2024)
Performance
Paragraph 5.12 – include evidence in future
reports of the effectiveness of the initiatives to
address staff absence specifically relating to
take-up and their impacts.
19 June 2025 Corporate
Programme
Manager
Performance report
on today’s agenda.
Item 4.
Page 11

Page 12

Item
No.
Title of Report Action Required Due Date Action By Update for 
29 October 2025
Report – Adult
Services
4.  Q3 Performance
Report for
Children and
Families and
Justice Social
Work
Chief Officer agreed to discuss with the Chair
and Depute Chair of the Board the most
suitable approach for Board to recommit to The
Promise following transfer of Children’s
Services from Council to MIJB.
TBC Chief Officer MIJB and Council
Development Session
titled ‘The Promise 5
Years on and Unpaid
Carers’ took place on
24 April 2025.
Action closed 
Page 12

Page 13

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE AND
RISK COMMITTEE ON 29 OCTOBER 2025 
SUBJECT: QUARTER 1 (APRIL - JUNE 2025) PERFORMANCE REPORT – ADULT
SERVICES 
BY:  CORPORATE PROGRAMME MANAGER 
1. REASON FOR REPORT 
1.1 To update the Committee on performance as at Quarter 1 2025 (April - June). 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
i) consider and note the performance of local indicators for Quarter 1
(April to June 2025), against revised targets for 2025/26, as presented
in the Performance Report at Appendix 1; 
ii) consider and note the analysis of indicators that have been
highlighted and actions being undertaken to address performance
that is outside of acceptable target ranges as detailed in section 5;   
iii) consider and note the commentary in section 6 and graphs for the
National and Ministerial Steering Group indicators in Appendix 2; and 
iv) approve the revised list of local indicators for future quarterly reports
included in paragraph 7.3 and the intention to provide deep dives into
specific areas of interest through the year. 
3. BACKGROUND 
3.1    The purpose of this report is to ensure the Moray Integration Joint Board (MIJB)
fulfils its ongoing responsibility to ensure effective monitoring and reporting on
the delivery of services and on the programme of work as set out in its Strategic
Plan. 
3.2    Appendix 1 identifies local indicators for the MIJB and the functions delegated
by NHS Grampian (NHSG) and Moray Council, enabling broader scrutiny and
assurance by the Board.  
Item 5.
Page 13

Page 14

4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1  Local Indicators are assessed on their performance via a common performance
monitoring Red, Amber, and Green (RAG) traffic light rating system. Some of
these local indicators sit with acute, although can and do impact our whole
system. 
RAG scoring based on the following criteria:
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within agreed tolerance.
RED If Moray is performing worse than target by more than agreed
tolerance. 
4.2 The detailed performance report for quarter 1 is attached in Appendix 1.   
Summary of Previously Agreed Indicators 
4.3 Figure 1 provides a summary and the historical trends in performance within
Health and Social Care Moray (HSCM) as demonstrated by the agreed indicators
up to the end of quarter 1 of the financial year 2025/26.  Where there is no
nationally set target the targets for Quarter 1 have been using average of activity
for previous calendar year. 
4.4 A summary of performance for each of the 6 reporting categories is provided
below. One indicator is presenting as green; three are amber and seven are red. 
EMERGENCY DEPARTMENT - AMBER
4.5 There was a very slight increase in the rate per 1,000 this quarter to 22.1. A slight
increase the number presented in the last quarter and slightly above Q1 2024 so
performance is largely at target at present.   
DELAYED DISCHARGES – RED   
4.6 The number of delays at the quarter 4 snapshot is at 32, which is down from 40 in
quarter 4 and down on the 33 recorded this time last year.  The figure fluctuates
throughout the period. 
4.7 Bed days lost due to delayed discharges decreased to 1,015 this quarter, down
from quarter 3 but up from 922 in Q1 2024/25. 
EMERGENCY ADMISSIONS – GREEN
4.8 The rate of emergency occupied bed days for over 65s has reduced in the last
three months to 2,329 this quarter and is continuing to reduce slowly but
steadily since the high of 2,749 in quarter 4 2022/23. The emergency admission
rate per 1000 population for over 65s has increased this quarter to 179.7 which is
just above the revised target.  Similarly, the number of people over 65 admitted
to hospital in an emergency is also very slightly above the revised target but has
maintained the rate of 125.7 in quarter 4 2024/25. 
HOSPITAL RE-ADMISSIONS - RED
Page 14

Page 15

4.9 The 7-day re-admissions have increased above target at 4.1%, and the 28-day re-
admissions have increased to above target at 9.4%.  The target has been revised
from 7.9% to 7.4% but the change over the last quarter has been significant. 
MENTAL HEALTH – RED  
4.10 60% of patients were referred within 18 weeks at the end of quarter 1, down from
65% the previous quarter. 
STAFF MANAGEMENT – RED   
4.11 Sickness absence for NHS employed staff has increased to 5.9% for quarter 1
which is lower than 7.0% for the same period last year, but up from quarter 4
absence of 4.9%. Council employed staff sickness has remained high at 8.1%
and above the same period last year of 7.5%. 
Page 15

Page 16

Figure 1 – Performance Summary 
Note: In order to match other national and local data sources indicators are showing the last month in the reporting quarter. 
Targets have been updated from Q1 2526 using average of activity for previous calendar year.  
MH and SM are LDP Standard Indicators and targets are set nationally so remain unchanged.
Q1 2425 Q2 2425 Q3 2425 Q4 2425 Q1 2526 New Target Previous Target
Apr-Jun Jul-Sep Oct-Dec Jan-Mar Apr-Jun (from Q1 2526) (from Q1 2425 or earlier)
AE Accident and Emergency
AE-01 A&E Attendance rate per 1000 population (All Ages) 21.5 22.6 19.7 22.0 22.1 21.4 21.9 A
DD Delayed Discharges
DD-01 Number of delayed discharges (including code 9) at census point 33 40 33 40 32 no change 26 R
DD-02 Number of bed days occupied by delayed discharges (including code 9) at census point 922 1115 981 1149 1015 no change 850 R
EA Emergency Admissions
EA-01 Rate of emergency occupied bed days for over 65s per 1000 population 2606 2603 2604 2412 2329 2564 2681 G‚
EA-02 Emergency admission rate per 1000 population for over 65s 178.7 177.7 183.6 177.8 179.7 179.4 187 A
EA-03
Number of people over 65 years admitted as an emergency in the previous 12 months per
1000 population 124.2 123.8 127.5 125.7 125.7 125.1 131 A
HR Hospital Readmissions
HR-01 % Emergency readmissions to hospital within 7 days of discharge 3.6% 4.6% 3.1% 3.9% 4.1% 3.7% 3.7% R
HR-02 % Emergency readmissions to hospital within 28 days of discharge 6.9% 8.9% 6.9% 7.4% 9.4% 7.4% 7.9% R
MH Mental Health
MH-01 % of patients commencing Psychological Therapy Treatment within 18 weeks of referral 70% 60% 44% 65% 60% no change 90% R
SM Staff Management
SM-01 NHS Sickness Absence (% of hours lost) 7.0% 6.4% 7.0% 4.9% 5.9% no change 4% R
SM-02 Council Sickness Absence (% of days lost) 7.5% 7.3% 7.3% 8.2% 8.1% no change 4% R                                                             
Health and Social Care Moray Performance Report                                          
Code Barometer (Indicator) RAG
Page 16

Page 17

5. AREAS REQUIRING IMPROVEMENT  
Delayed Discharges - Red 
Situation 
5.1 In April 2025, delayed discharges decreased to 32, below the Q4 2024/25 figure
of 40. The average through the quarter was 37 but this remains above the
Scottish Government target of 26 for Moray.  Bed days occupied by delayed
discharges decreased to 1,015 (from 1,149), which is positive and reflects the
continued focused effort to scrutinise reasons why people are delayed and to
find solutions. There has been  a notable increase in persons awaiting care
home placement at present however progress with Care at Home
transformation, in the establishment of a framework for commissioning
personal care and onboarding of other providers, has increased the choice
available for people at all options. This is reflected in the number of days
occupied decreasing, as well as a decrease in the numbers of people waiting
over 90 days for care. 
5.2 Community hospitals operated at 99.8% occupancy (Apr-Jun), with an average
stay of 81.7 days. Patient acuity remains high, particularly among frail, elderly
individuals. The higher acuity has seen an increase in the request for permanent
care home placement. 
5.3 Unmet need remains high at the end of Q1 with an average of 33 people in
hospital and 151 people in the community awaiting care through the period.  At
the end of June there were 1,205 hours of care not provided, a reduction since
the end of the previous quarter and since the same period the previous year. 
There is a decreasing trend which is a positive sign that the work to increase
capacity with the new framework and to strengthen governance around the
resource allocation process is increasing choice for people and evidencing
prioritisation of available resource.   The demand for care continues to exceed
available resources and these figures overall reflect ongoing whole-system
pressures 
Mitigation and Impact
•  Daily multi-disciplinary meetings support real-time collaborative decision-
making and system flow.
• Surge beds in one community hospital (Seafield) were operational in this
quarter easing pressure on acute and community services.
• A new home assessment pathway is to be introduced, with funding from
Scottish Government, that will aim to return patients home more quickly,
allowing for full comprehensive, multi-disciplinary assessment in their own
home.  There is an expectation to meet the Scottish Government target for
delayed discharges, of 26 for Moray, in 12 months. Evaluation of the
Page 17

Page 18

progress of this initiative with commence in December 2025 and will begin
to influence community hospital redesign. 
•  Enhanced scrutiny: All discharges over 90 days are discussed and logged
on the Datix system with action plans in place.
•  The Strategic Care at Home workstream is focused on maximising care
delivery within budget.
•  Innovation and digital solutions: the Digital Health Institute (Growth Deal) is
progressing the research of technology-enabled care solutions to support
independent living in a trial in Buckie.  Outcomes will inform the approach
for Technology Enabled Care going forward.
•  Discharge Without Delay programme, in collaboration with NHS Grampian
and Health Intelligence Scotland, is progressing with system wide actions
to reduce delays for people medically fit for discharge: Phase One
completed, including national self-assessment tool and action planning.
• CQS payment changes have enabled provision of sustainable additional
care hours. 
• Resource Allocation meetings have been redesigned for efficiency.
• Absence management is in place to stabilise workforce capacity. 
5.4 While challenges persist, targeted interventions and strategic programmes are
in place to improve flow, reduce delays, and support people to live well at home. 
Hospital Readmission - Red
5.5 Whilst there has been a slight increase in the 7-day emergency readmission
percentage, the increase to 9.4% for the emergency readmission to hospital
within 28 days of discharge takes it to its highest level in the past year. 
5.6 It should be noted that people do not always present/readmit for the same
clinical reasons.  In this quarter many readmissions relating to the same reason
were respiratory in nature, which was also reflected in staff absences in this
quarter also. There were 261 readmissions to Dr Gray’s Hospital in this quarter
(28 days) and 9 of these were from community hospitals. 94 were readmitted in
the same diagnosis grouping. This is slightly higher than the same time last year
and is reflective of the respiratory illnesses experienced in this quarter.
Preventative readmission will be a better measure of performance, and the
home assessment pathway will begin to measure this as part of their key
performance indicators (KPI). 
Mental Health – Red 
Situation
5.7 The demand for adult mental health and primary care psychological therapies
continues to be high.   Secondary care mental health services are meeting the
18-week referral to treatment target for psychological therapies with 100% of
people referred starting treatment in September 2025.  This is due to a variety of
factors but the establishment of groupwork within the service has played a
significant part in this. The demand on Primary care psychological therapies is
high. 15% of people referred started treatment in September 2025 Referrals are
being screened to ensure they meet the criteria for the service and learning from
psychological therapies in secondary care mental health services is being
Page 18

Page 19

incorporated to improve the referral to treatment target. Delayed discharges in
relation to Mental Health have improved, but complex cases remain difficult to
place.  The Medical staffing remains challenging, but   an improvement in
stability is noted, which will improve performance in primary and secondary care
mental health services. 
Mitigation 
•  Close monitoring of waiting times is place.
• Embed some of the learning from provision of secondary care
psychological therapies within primary care psychological therapies.
•  Ward model changes in Ward 4 (e.g., single consultant model) continue
to indicate an improvement in patient flow.
• Increased stability in medical staffing.  Group development and job
planning aim to increase throughput and maximise capacity. 
Staff Management – Red 
Situation
5.8 Both NHS staff and Council staff sickness absence is above the target of 4%. 
5.9 Council employed staff sickness absence was 8.1%,  down  slightly on the
previous quarter but above the 7.5% at the same point in the previous year.,
whilst NHSG employed staff sickness absence has fluctuated through the year
and is now sitting at 5.9%. Common causes of absence remain mental health
and musculoskeletal issues, with spikes in respiratory and gastrointestinal
illnesses being experienced throughout the year, not limited to winter months as
in previous years. Respiratory illness continued to spike into quarter one, and
there was a significant amount of planned, elective operations affecting long
term sick leave. 
5.10 Although Council staff absence rates continue to remain significantly above
target around 7-8%, NHSG absence rates have seen a decrease overall in the
past 2 years.   Robust absence management is in place across the partnership
and for NHSG staff there has been a reduction in long term sickness. April 2025
saw 23.5% of all hours lost due to anxiety, stress etc. (long term) and 8.48%
short term, whereas February 2024 saw 26% long term and 6.9% short term.
This indicates headway has been made into addressing long term sickness
caused by mental health reasons, as per HSCM delivery plans. However, MSK
injury has seen an increase in long term sickness, from 9.5% in February 2024
to 11.69% in April 2025. HSCM will continue to ensure compliance in manual
handling training and to ensure staff are fully rested and prepared for shifts. 
5.11  Mitigation 
• Vaccination campaigns for flu and COVID-19 aim to reduce severity and
duration of illness.
• There are groups now meeting in both NHSG and Moray Council to monitor,
evaluate and discuss strategy regarding absence. 
• HSCM’s Health and Safety delivery plan has a focus on absence regarding
mental health and MSK. 
Page 19

Page 20

• Workstation assessments (DSE) are promoted for desk-based staff, with
ergonomic equipment provided as needed.
• Wellbeing Initiatives are promoted throughout the organisation and its
partners. NHS Grampian actively encourage the We Care website for staff
access to health and wellbeing resources. These are often downloaded
resources and are shared across HSCM.
• Occupational Health Service to provide support for both physical and
mental health issues.
• Safe Staffing Tools are used daily to support staff, monitor and manage
workload, helping to reduce stress related absences in clinical areas. 
6. NATIONAL INDICATORS 
6.1 The MIJB Annual Performance Report (APR) 2024/25 was agreed on 19 June 2025
(para 8 of the minute refers) with the final version to include the National
Performance indicators and the Ministerial Steering Group (MSG) indicators
when published in July. 
6.2 These indicators were published in July 2025 by Public Health Scotland and are
included in the APR published version.  Unfortunately, there were issues at a
national level with the data that is collated that is out with HSCM’s control, but
impacts on the assessment of performance and any trends over time.  For both
National and MSG indicators there are some data completeness issues.
National Indicators 1-9 remained the same as the survey that informs them is
only undertaken every two years.  For indicators 11-19 there were instructions
from Public Health Scotland to use calendar year 2024 as a proxy for 2024/25
due to the national data for 2024/25 being incomplete. 
6.3 These issues affect HSCM’s ability to draw out assessment of progress in
performance at this stage, but when the data incompleteness issues are
addressed, it will be reviewed and commentary provided to this Committee. 
6.4 Appendix 2 outlines the performance of the national indicators that were not
affected by the data issues: - 
• MSG 3a Number of A&E Attendances
• MSG 4   Number of Delayed Discharge Bed Days
• National Indicator 19 – Number of days people spend in hospital when
they are ready to be discharged (per 1,000 population)
• National Indicator 17 – the proportion of care services graded “good” (4)
or better in Care Inspectorate Inspections expressed as a percentage.
• National Indicator 18 – the percentage of adults with intensive care needs
receiving care at home. 
6.5 Overall Moray is maintaining performance levels in these indicators, except for
NI17 and NI19.  For NI17 was disappointing to see a drop in performance for
Moray, this was due to two providers having lower scores than usual.  This was
addressed and both providers have improved, and a subsequent inspection has
been very positive.  For NI19 there has been a significant decrease in the number
Page 20

Page 21

of days people spend in hospital when they are ready to be discharged.  This is
because of the successful sustained effort during 2024/25 to focus on those
patients who had been in hospital for a long time to enable them to be
discharged to a suitable place and the continued efforts to focus on getting
people home safely. 
7. PERFORMANCE FRAMEWORK 
7.1 Following the approval of the Strategic Delivery Plan by the Moray Integration
Joint Board (MIJB) on 29 May 2025 (para 8 of the draft minute refers), the review
of the performance management framework is underway. 
7.2 A revised Performance Framework that will set out key performance  
indicators and governance arrangements is being developed that will: 
• Ensure robust monitoring and oversight by appropriate groups
• Maintain a clear line of sight between activity undertaken and outcomes
achieved for people
• Support evidence of delivery of the strategic priorities set out in the new
plan
• Enable evidence-based decision making, 
• strengthen accountability and continuous improvement 
7.3 As part of this exercise the following adjustments are proposed for future
reporting on quarterly performance to this committee: 
Remove from regular reporting
Ref Emergency Admissions Comment
EA-01 Rate of emergency occupied bed days
for over 65s per 1000 population
These indicators are more
acute focused.  These figures
will still be collated but will be
used to support narrative
around delayed discharges. 
It is intended to do a deep dive
on this type of information to
show where people are
coming from and why, which
will inform locality planning.
EA-02 Emergency admission rate per 1000
population for over 65s
EA-03 Number of people over 65 years
admitted as an emergency in the
previous 12 months per 1000
population 
NEW to Include in Quarterly reports
Ref Unmet Need Comment
UM-01 Unmet Need for care in the
community hours & people waiting (at
end of quarter)
Over time this is intended to
demonstrate the impact of
various actions being
undertaken to increase flow
and capacity and reduce
waiting times for care. 
Improving Choice and control over
the support people receive 
Page 21

Page 22

SDS-
01,02,
03,04,05
SDS options – numbers of people on
each option.
% people who received their first
option
The intention is to monitor the
movement through options to
demonstrate a shift from
option 3 but to also track that
people are receiving the
option they choose. 
Support for carers 
SC-01 
SC-02
SC-03
Referrals for support received in
quarter.
No of carer support plans completed /
time taken to complete assessment
This will provide information
regarding the volume of need
and HSCM’s ability to provide
the support 
7.4 Other areas are being considered and as work progresses with the strategic
delivery plan other proposals will be brought forward to this committee for
consideration.  It is also the intention to undertake deep dives into key aspects of
performance to inform the Committee of current status, recognise success and
outline future plans to address any issues identified. 
8. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Moray
Partners in Care 2022-2032”
Performance management reporting is a legislative requirement under
section 42 of the Public Bodies (Joint Working) (Scotland) Act 2014.   
In addition to publishing an Annual Performance Report, the Moray
Integration Scheme requires that the MIJB will “monitor the performance of
the delivery of integrated services using the Strategic Plan on an ongoing
basis” (para 5.2.2 of the Moray Integration Scheme refers). 
(b) Policy and Legal
There are no new policy or legal implications arising directly from this
report. The report is consistent with existing statutory duties and
governance arrangements. 
(c) Financial implications
There are no direct financial implications associated with this report.
However, performance insights may inform future resource planning and
prioritisation aligned with strategic objectives. 
(d) Risk Implications and Mitigation
While there are no immediate risks arising from this report, the long-term
impacts of COVID-19 on the health and social care system remain
uncertain. The performance framework will continue to be reviewed and
adapted to ensure responsiveness to emerging risks and system
pressures. 
Page 22

Page 23

There is also a risk that the MIJB may not deliver on the outcomes set out in
the Strategic Plan. Where such risks are identified, they will be escalated
and presented to the Board for appropriate oversight and action. 
(e) Staffing Implications
While there are no direct staffing implications arising from this report, it is
important to acknowledge the ongoing challenges with recruitment and
staff absence across health and social care services. These workforce
pressures continue to impact the MIJB’s ability to deliver services in line
with strategic objectives
Recruitment difficulties, particularly in rural and specialist roles, combined
with high levels of sickness absence in some areas, pose a significant
operational risk. These issues are being monitored closely, are considered
within workforce planning, and service redesign efforts. 
(f) Property
There are no property implications directly associated with this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment (EIA) is not required for this report, as it
does not introduce or amend any policy or service that would directly affect
individuals with protected characteristics. However, performance data
may be used to inform future service improvements that promote equity
and inclusion. 
(h) Climate Change and Biodiversity Impacts
There are no direct climate or biodiversity implications arising from this
report. However, it is recognised that extreme weather events and rising
energy costs may increasingly impact service delivery, particularly in rural
areas. These factors will be considered in future strategic planning. 
(i) Directions
No new directions are required as a result of this report. 
(j) Consultations
Senior Management Team, Operational Management Team Health and
Social Care, Caroline O’Connor, Committee Services Officer, Moray
Council and their comments are incorporated in the report. 
9. CONCLUSION 
9.1 This report provides the Committee with an overview of the performance of
specified Local indicators, outlines actions being undertaken to improve
performance in Section 5, and further expanded in Appendix 1. 
9.2 In addition, Appendix 2 includes an update on National indicators where
trends can be assessed that offers further insight into delivery of our
strategic objectives.  Section 7 includes proposed amendments to the
specified local indicators intended to provide more scrutiny around key
focus areas of the Strategic Delivery Plan.
Page 23

Page 24

9.3 This performance report supports the MIJB’s ongoing commitment to
transparency, continuous improvement, and delivery of the strategic
outcomes set out in the Moray Strategic Plan. 
Authors of Report: Jeanette Netherwood, Corporate Programme Manager 
Background Papers: Available on request 
Page 24

Page 25

Appendix 1   
PERFORMANCE REPORT
SUPPORTING CHARTS 
QUARTER 1
2025/26 
(1 APRIL 2025 – 30 JUNE 2025)  
Page 25

Page 26

Table of Contents  
Health and Social Care Moray - 1 - 2022-23 Quarter 1 Performance Report
1. TABLE OF CONTENTS
1. Table of Contents ............................................................................................................................. 1
1. Performance Summary .................................................................................................................... 2
Barometer Overview ........................................................................................................................... 2
2. Delayed Discharge - RED .................................................................................................................. 3
DD-01: Number of delayed discharges (including code 9, Census snapshot, at end of quarter) ....... 3
DD-02: Number of Bed Days Occupied by Delayed Discharges per quarter (inc code 9) per 1000 18+
population ........................................................................................................................................... 4
3. Emergency Admissions - GREEN ...................................................................................................... 5
EA-01: Rate of emergency occupied bed days for over 65s per 1000 population .............................. 5
EA-02: Emergency Admissions rate per 1000 population for over 65s .............................................. 6
EA-03: Number of people over 65 years admitted as an emergency in the previous 12 months per
1000 population .................................................................................................................................. 7
4. Emergency Department – AMBER .................................................................................................. 8
AE-01: ED Attendance rates per 1,000 population (All Ages) ............................................................. 8
5. Hospital Re-admissions - RED .......................................................................................................... 9
HR-01: Percentage of Emergency Re-admissions to hospital within 7 days - Moray Patients ........... 9
HR-02: Percentage of Emergency Re-admissions to hospital within 28 days - Moray Patients ....... 10
6. Mental Health – RED ..................................................................................................................... 11
MH-01: Percentage of patients commencing Psychological Therapy Treatment within 18 weeks of
referral ............................................................................................................................................... 11
7. Staff Management - RED ............................................................................................................... 12
SM-01: NHS Sickness Absence % of Hours Lost ................................................................................ 12
SM-02: Council Sickness Absence (% of Calendar Days Lost) ............................................................ 12
Appendix 1: Key and Data Definitions .................................................................................................. 14
RAG Scoring Criteria .......................................................................................................................... 14
Peer Group Definition ....................................................................................................................... 14
Appendix 2: Strategic Priorities............................................................................................................. 15
Appendix 3: National Health and Wellbeing Outcomes ....................................................................... 17 
Page 26

Page 27

Performance Summary  
Health and Social Care Moray - 2 - 2022-23 Quarter 1 Performance Report
1. PERFORMANCE SUMMARY
BAROMETER OVERVIEW 
Moray currently has 11 local indicators. Of these 1 is Green, 3 are Amber and 7 are Red. 
Figure 1 - Performance Summary                                                                         
Note: In order to match other national and local data sources indicators are showing the last month in the reporting quarter.
Targets have been updated from Q1 2025/26 using average of activity for previous calendar year.
MH and SM are LDP Standard Indicators and targets are set nationally so remain unchanged.                                                 
Q1 2425 Q2 2425 Q3 2425 Q4 2425 Q1 2526 New Target Previous Target
Apr-Jun Jul-Sep Oct-Dec Jan-Mar Apr-Jun (from Q1 2526) (from Q1 2425 or earlier)
AE Accident and Emergency
AE-01 A&E Attendance rate per 1000 population (All Ages) 21.5 22.6 19.7 22.0 22.1 21.4 21.9 A
DD Delayed Discharges
DD-01 Number of delayed discharges (including code 9) at census point 33 40 33 40 32 no change 26 R
DD-02
Number of bed days occupied by delayed discharges (including code 9) at census
point 922 1115 981 1149 1015 no change 850 R
EA Emergency Admissions
EA-01 Rate of emergency occupied bed days for over 65s per 1000 population 2606 2603 2604 2412 2329 2564 2681 G‚
EA-02 Emergency admission rate per 1000 population for over 65s 178.7 177.7 183.6 177.8 179.7 179.4 187 A
EA-03
Number of people over 65 years admitted as an emergency in the previous 12
months per 1000 population 124.2 123.8 127.5 125.7 125.7 125.1 131 A
HR Hospital Readmissions
HR-01 % Emergency readmissions to hospital within 7 days of discharge 3.6% 4.6% 3.1% 3.9% 4.1% 3.7% 3.7% R
HR-02 % Emergency readmissions to hospital within 28 days of discharge 6.9% 8.9% 6.9% 7.4% 9.4% 7.4% 7.9% R
MH Mental Health
MH-01
% of patients commencing Psychological Therapy Treatment within 18 weeks of
referral 70% 60% 44% 65% 60% no change 90% R
SM Staff Management
SM-01 NHS Sickness Absence (% of hours lost) 7.0% 6.4% 7.0% 4.9% 5.9% no change 4% R
SM-02 Council Sickness Absence (% of days lost) 7.5% 7.3% 7.3% 8.2% 8.1% no change 4% R                                                             
Health and Social Care Moray Performance Report                                          
Code Barometer (Indicator) RAG
Page 27

Page 28

Delayed Discharge - RED  
Health and Social Care Moray - 3 - 2022-23 Quarter 1 Performance Report
2. DELAYED DISCHARGE - RED
Trend Analysis 
The number of delays at the quarter 1 snapshot is down to 32, which is down from 40 in quarter 4
2024/25 and down on the 33 recorded this time last year.    
Bed days lost due to delayed discharges decreased to 1,015 this quarter, down from quarter 4 but up
from 992 in June 2024. 
WDD-01: NUMBER OF DELAYED DISCHARGES (INCLUDING CODE 9, CENSUS
SNAPSHOT, AT END OF QUARTER)
Purpose 
Reliably achieving timely discharge from hospital is an important indicator of
quality and is a marker for person centred, effective, integrated, and harm
free care.
Strategic Priority  2: HOME FIRST Linked Indicator(s) DD-02
National Health & Wellbeing Outcomes 2, 3, 5, 7 
Figure 2 – Delayed Discharges 
Indicator Trend – stablising
Source Public Health Scotland 
Page 28

Page 29

Delayed Discharge - RED  
Health and Social Care Moray - 4 - 2022-23 Quarter 1 Performance Report
DD-02: NUMBER OF BED DAYS OCCUPIED BY DELAYED DISCHARGES PER QUARTER (INC
CODE 9) PER 1000 18+ POPULATION 
Purpose  This monitors the number of people delayed in hospital once medically fit
for discharge. Longer stays in hospital are associated with increased risk of
infection, low mood, and reduced motivation.
Strategic Priority  2: HOME FIRST Linked Indicator(s) DD-01
National Health & Wellbeing Outcomes 2, 3, 5, 7 
Figure 3 – Delayed Discharge Bed-days 
Indicator Trend – Stabilising
Source Public Health Scotland
Page 29

Page 30

Emergency Admissions - GREEN  
Health and Social Care Moray - 5 - 2022-23 Quarter 1 Performance Report
3. EMERGENCY ADMISSIONS - GREEN
Trend Analysis
The rate of emergency occupied bed days for over 65s has reduced in the last four months to 2,329
this quarter and is still down on the high of 2,749 in quarter 4 2022/23. 
The emergency admission rate per 1000 population for over 65s has increased this quarter to 179.7
which is now just above the new target of 179.4 but well below the high in quarter 2 2023/24 of 189.9.
Similarly, the number of people over 65 admitted to hospital in an emergency also had hit a high of
133.2 in quarter 2 2023/24 and despite an remaining at 125.7 this quarter it is just above the new
target of 125.1 for 2025/26. 
EA-01: RATE OF EMERGENCY OCCUPIED BED DAYS FOR OVER 65S PER 1000
POPULATION
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a narrative
when viewed together of whether emergency admissions and bed days are
within tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) EA-02, EA-03
National Health & Wellbeing Outcomes 1, 2, 3, 5 
Figure 4 – Emergency Occupied Bed-days (Over 65s) 
Indicator Trend – Reducing
Source Health Intelligence  
Page 30

Page 31

Emergency Admissions - GREEN  
Health and Social Care Moray - 6 - 2022-23 Quarter 1 Performance Report
EA-02: EMERGENCY ADMISSIONS RATE PER 1000 POPULATION FOR OVER 65S
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a story when
viewed together of whether emergency admissions and bed days are within
tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) EA-01, EA-03 
National Health & Wellbeing Outcomes  1, 2, 3, 5 
Figure 5 – Emergency Admissions (Over 65s) 
Indicator Trend – Steady
Source Health Intelligence  
Page 31

Page 32

Emergency Admissions - GREEN  
Health and Social Care Moray - 7 - 2022-23 Quarter 1 Performance Report
EA-03: NUMBER OF PEOPLE OVER 65 YEARS ADMITTED AS AN EMERGENCY IN THE
PREVIOUS 12 MONTHS PER 1000 POPULATION
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a story when
viewed together of whether emergency admissions and bed days are
within tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) EA-01, EA-02
National Health & Wellbeing Outcomes 1, 2, 3, 5 
Figure 6 – Number of Over 65 People Emergency Admissions 
Indicator Trend – Steady
Source Health Intelligence  
Page 32

Page 33

Emergency Department – AMBER  
Health and Social Care Moray - 8 - 2022-23 Quarter 1 Performance Report
4. EMERGENCY DEPARTMENT – AMBER
Trend Analysis 
There was an increase in the rate per 1,000 this quarter to 22.1. This is a slight increase the numbers
presenting in the last 3 quarters but still below March 2024 and the data has been trending down
since then despite the small increase in the most recent month. 
AE-01: ED ATTENDANCE RATES PER 1,000 POPULATION (ALL AGES)
Purpose  A greater system-wide understanding of how people access emergency
care, and why certain choices are made, will allow local health systems to
develop intelligence about avoidable attendances at emergency
departments and target their responses. 
Strategic Priority  3: PARTNERS IN CARE Linked Indicator(s) HR-01, HR-02
National Health & Wellbeing Outcomes  1, 2, 3, 5 
Figure 7 – ED Attendance Rate 
Indicator Trend – Steady
Source Health Intelligence  
Page 33

Page 34

Hospital Re-admissions - RED  
Health and Social Care Moray - 9 - 2022-23 Quarter 1 Performance Report
5. HOSPITAL RE-ADMISSIONS - RED
Trend Analysis 
The 7-day re-admissions have increased to just over target to 4.1%, and the 28-day re-admissions
have increased further to above target at 9.4%. 
HR-01: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO HOSPITAL WITHIN 7 DAYS -
MORAY PATIENTS
Purpose  Re-admissions are often undesirable for patients and have also been shown
to be associated with the quality of care provided to patients at several
stages along the clinical pathway, including during initial hospital stays,
transitional care services and post-discharge support.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) HR-02, AE-01
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 8 – 7-dayEmergency Readmissions 
Indicator Trend – Steady
Source Health Intelligence  
Page 34

Page 35

Hospital Re-admissions - RED  
Health and Social Care Moray - 10 - 2022-23 Quarter 1 Performance Report
HR-02: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO HOSPITAL WITHIN 28 DAYS
- MORAY PATIENTS
Purpose  Re-admissions are often undesirable for patients and have also been shown
to be associated with the quality of care provided to patients at several
stages along the clinical pathway, including during initial hospital stays,
transitional care services and post-discharge support. (This measure lags by
a month due to the time required for a potential 28 day discharge to occur)
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) HR-01, AE-01
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 9 – 28-day Emergency Readmissions 
Indicator Trend – Steady
Source Health Intelligence
Page 35

Page 36

Mental Health – RED  
Health and Social Care Moray - 11 - 2022-23 Quarter 1 Performance Report
6. MENTAL HEALTH – RED 
Trend Analysis 
After an improvement in performance from achieving a low 40% in January 2024 there has been little
variation in performance through the rest of 2024 and into 2025 with 60% of patients now being
referred within 18 weeks at the end of quarter 1 2025/26. 
MH-01: PERCENTAGE OF PATIENTS COMMENCING PSYCHOLOGICAL THERAPY
TREATMENT WITHIN 18 WEEKS OF REFERRAL
Purpose  Timely access to healthcare is a key measure of quality and that applies
equally in respect of access to mental health services.
Strategic Priority  3: PARTNERS IN CARE Linked Indicator(s) 
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 10 – Psychological Therapy Treatment within 18 Weeks 
Indicator Trend – Steady
Source Health Intelligence  
Page 36

Page 37

Staff Management - RED  
Health and Social Care Moray - 12 - 2022-23 Quarter 1 Performance Report
7. STAFF MANAGEMENT - RED
Trend Analysis 
Sickness absence for NHS employed staff has increased to 5.9% at the end of quarter 1 2025/26.
Council employed staff sickness has remained high at 8.05%. 
SM-01: NHS SICKNESS ABSENCE % OF HOURS LOST
Purpose  Attendance at work of all employees is essential in the interests of the
effective and efficient operation of services.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) SM-02
National Health & Wellbeing Outcome  8 
Figure 11 – NHS Sickness Absence 
Indicator Trend – Steadily increasing
Source Health Intelligence 
SM-02: COUNCIL SICKNESS ABSENCE (% OF CALENDAR DAYS LOST)
Purpose  Attendance at work of all employees is essential in the interests of the
effective and efficient operation of services.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) SM-01
National Health & Wellbeing Outcome  1, 2, 3, 5
Page 37

Page 38

Staff Management - RED  
Health and Social Care Moray - 13 - 2022-23 Quarter 1 Performance Report 
Figure 12 – Moray Council Sickness Absence 
Indicator Trend – Steady
Source Council HR 
Page 38

Page 39

Staff Management - RED  
Health and Social Care Moray - 14 - 2022-23 Quarter 1 Performance Report
APPENDIX 1: KEY AND DATA DEFINITIONS
RAG SCORING CRITERIA
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within specified tolerance.
RED If Moray is performing worse than target but outside of specified
tolerance. 
PEER GROUP DEFINITION
Moray is defined as being in Peer Group 2 in the Local Government Benchmarking Framework 
Family Group 1 Family Group 2 Family Group 3 Family Group 4
East Renfrewshire
East Dunbartonshire
Aberdeenshire
Edinburgh, City of
Perth & Kinross
Aberdeen City
Shetland Islands
Orkney Islands
Moray
Stirling
East Lothian
Angus
Scottish Borders
Highland
Argyll & Bute
Midlothian
Falkirk
Dumfries & Galloway
Fife
South Ayrshire
West Lothian
South Lanarkshire
Renfrewshire
Clackmannanshire
Eilean Siar
Dundee City
East Ayrshire
North Ayrshire
North Lanarkshire
Inverclyde
West Dunbartonshire
Glasgow City 
Page 39

Page 40

Staff Management - RED  
Health and Social Care Moray - 15 - 2022-23 Quarter 1 Performance Report
APPENDIX 2: STRATEGIC PRIORITIES 
Page 40

Page 41

Staff Management - RED  
Health and Social Care Moray - 16 - 2022-23 Quarter 1 Performance Report 
•EA-01: RATE OF EMERGENCY OCCUPIED BED DAYS FOR OVER
65S PER 1000 POPULATION
•EA-02: EMERGENCY ADMISSIONS RATE PER 1000 POPULATION
FOR OVER 65S
•EA-03: NUMBER OF PEOPLE OVER 65 YEARS ADMITTED AS AN
EMERGENCY IN THE PREVIOUS 12 MONTHS PER 1000
POPULATION
•HR-01: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO
HOSPITAL WITHIN 28 DAYS -MORAY PATIENTS
•HR-02: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO
HOSPITAL WITHIN 7 DAYS -MORAY PATIENTS
•SM-01: NHS SICKNESS ABSENCE % OF HOURS LOST
•SM-02: COUNCIL SICKNESS ABSENCE (% OF CALENDAR DAYS
LOST)
BUILDING
RESILIENCE
•DD-01: NUMBER OF DELAYED DISCHARGES (INCLUDING CODE 9,
CENSUS SNAPSHOT, AT END OF QUARTER)
•DD-02: NUMBER OF BED DAYS OCCUPIED BY DELAYED
DISCHARGES PER QUARTER (INC CODE 9) PER 1000 18+
POPULATION
•UN-01: NUMBER OF LONG-TERM HOME CARE HOURS UNMET
AT WEEKLY SNAPSHOT
•UN-02: NUMBER OF PEOPLE WITH LONG-TERM CARE HOURS
UNMET AT WEEKLY SNAPSHOT
HOME
FIRST
•OA-01: NUMBER OF REVIEWS OUTSTANDING AT END OF
QUARTER SNAPSHOT
•MH-01: PERCENTAGE OF PATIENTS COMMENCING
PSYCHOLOGICAL THERAPY TREATMENT WITHIN 18 WEEKS OF
REFERRAL
•AE-01: A&E ATTENDANCE RATES PER 1000 POPULATION (ALL
AGES)
PARTNERS
IN CARE
Page 41

Page 42

Staff Management - RED  
Health and Social Care Moray - 17 - 2022-23 Quarter 1 Performance Report
APPENDIX 3: NATIONAL HEALTH AND WELLBEING OUTCOMES
1 - PEOPLE ARE ABLE TO LOOK AFTER AND IMPROVE THEIR OWN HEALTH AND WELLBEING AND
LIVE IN GOOD HEALTH FOR LONGER. 
2 - PEOPLE, INCLUDING THOSE WITH DISABILITIES OR LONG-TERM CONDITIONS, OR WHO ARE
FRAIL; ARE ABLE TO LIVE, AS FAR AS REASONABLY PRACTICABLE, INDEPENDENTLY AT HOME,
OR IN A HOMELY SETTING IN THEIR COMMUNITY. 
3 - PEOPLE WHO USE HEALTH AND SOCIAL CARE SERVICES HAVE POSITIVE EXPERIENCES OF
THOSE SERVICES, AND HAVE THEIR DIGNITY RESPECTED. 
4 - HEALTH AND SOCIAL CARE SERVICES ARE CENTRED ON HELPING TO MAINTAIN OR IMPROVE
THE QUALITY OF LIFE OF PEOPLE WHO USE THOSE SERVICES. 
5 - HEALTH AND SOCIAL CARE SERVICES CONTRIBUTE TO REDUCING HEALTH INEQUALITIES. 
6 - PEOPLE WHO PROVIDE UNPAID CARE ARE SUPPORTED TO LOOK AFTER THEIR OWN HEALTH
AND WELLBEING, INCLUDING TO REDUCE ANY NEGATIVE IMPACT OF THEIR CARING ROLE ON
THEIR OWN HEALTH AND WELLBEING. 
7 - PEOPLE USING HEALTH AND SOCIAL CARE SERVICES ARE SAFE FROM HARM. 
8 - PEOPLE WHO WORK IN HEALTH AND SOCIAL CARE SERVICES FEEL ENGAGED WITH THE WORK
THEY DO AND ARE SUPPORTED TO CONTINUOUSLY IMPROVE THE INFORMATION, SUPPORT,
CARE, AND TREATMENT THEY PROVIDE. 
9 - RESOURCES ARE USED EFFECTIVELY AND EFFICIENTLY IN THE PROVISION OF HEALTH AND
SOCIAL CARE SERVICES.
Page 42

Page 43

APPENDIX 2 
Extract of National Peformance Measures 2024/25
a) MSG Indicator 3a – Number of attendances at A&E
The blue line in this graph relates to the figure for Scotland as a whole and the green line
relates to Grampian.   As you can see the graph lines follow a very similar pattern
although the increase in Grampian is more marked from 2022/23 to 2023/24.   
In Moray this indicator fluctuates throughout the year with some seasonal variations but
overall is relatively stable with 26,861 attendances in 2023/24 and a slight reduction to
25,326 in 2024/25.   
Page 43

Page 44

MSG Indicator 4 and national indicator 19 show data in relation to delayed discharges
but in slightly different ways
The graph on the left is for MSG indicator 4 - the number of delayed discharge bed days.  
The blue line is Scotland, and the green line is Grampian and again the trend lines are
very similar but with a more marked increase in Grampian between 2023/24 and
2024/25.   In Moray there has been a slight increase in the number of delayed discharge
bed days from 2023/24 figure of 12,119 to 12,737 in 2024/25, but this remains well
below the high of 2022/23 of 14,123.    
The graph below is for national indicator 19 which is the number of days people spend
in hospital when they are ready to be discharged (per 1,000 population).   In this graph
the blue line is the Scottish average, and the red line is Moray.   At the end of 2024/25
across Grampian all three health and social care partnership areas were below the
Scottish average, with Moray being the only one to show a downwards trajectory.   
The figures have dropped from 976 in 2023/24 to 865 in 2024/25, the reduction taking
place in the last quarter linked to a significant focussed effort to resolve the issues
preventing discharge for those with longest stays and a fully staffed internal care at
home provision and a slight increase in capacity of the external partner for care at
home.
National Indicator 19 – Number of days people spend in hospital when
they are ready to be discharged (per 1,000 population)
Page 44

Page 45

The graph below relates to national indicator 17 - the proportion of care services graded
‘good’ (4) or better in Care Inspectorate Inspections expressed as a percentage.   
Across Grampian all partnerships were well below the Scottish average and Moray
figures have shown a decrease of 7.3% from 81.1% to 73.8%.  Whilst this looks alarming
it is due to the relatively small numbers of inspections occurring and it is the impact of a
reduction in score for 2 providers which causes this significant change in our score.
A commissioning team member sits in on Care Inspectorate feedback sessions and any
grade issues or other issues are reported via social work and taken to the weekly Multi
Agency Monitoring Group.  An Multi-Disciplinary Team agreement is reached regarding
appropriate action and support required. The agreed action is undertaken, and progress
is reported to the Collaborative oversight group, along with any recommendations for
additional supports or actions, on a weekly basis until resolved, or the matter requires
escalation to Senior management team, but we have not experienced that situation to
date. 
NI-18 - the percentage of adults with intensive care needs receiving care at home.   
Again, unfortunately all three Grampian partnerships are below the Scottish average. 
Moray is maintaining it’s level in comparison to the Scottish average. 
National Indicator 17 – the proportion of care services graded ‘good’ (4)
or better in Care Inspectorate Inspections expressed as a percentage.   
National Indicator 18 - the percentage of adults with intensive care
needs receiving care at home.   
Page 45

Page 46

Page 46

Page 47

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE AND
RISK COMMITTEE ON 29 OCTOBER 2025 
SUBJECT: QUARTER 1 (APRIL TO JUNE 2025) PERFORMANCE REPORT FOR
CHILDREN AND FAMILIES AND JUSTICE SOCIAL WORK 
BY:      INTERIM CHIEF SOCIAL WORK OFFICER/HEAD OF SERVICE 
1. REASON FOR REPORT 
1.1 To inform the Committee on Children and Families and Justice Social Work
performance as at Quarter 1 (April to June 2025). 
2. RECOMMENDATIONS 
2.1 It is recommended Committee scrutinises and notes: 
i) the performance of local indicators for Quarter 1 as presented in the
Performance Report at Appendix 1; and 
ii) the analysis of the local indicators as detailed in Appendix 1. 
3. BACKGROUND 
3.1 The purpose of this report is to inform Moray Integration Joint Board (MIJB) of the
quarterly performance data which provides the analysis of the delivery of
Children, Families and Justice Social Work services. 
3.2 Appendix 1 identifies local indicators for the MIJB and the functions delegated
by NHS Grampian and Moray Council for Children, Families and Justice Social
Work services to allow wider scrutiny by the Board. 
4. SUMMARY 
4.1 Work is underway to develop and agree the refresh of Moray’s key performance
indicators to enable recording of local data and measures set against the
national performance indicators. 
4.2 Appendix 1 provides a summary and the historical trends: 
• Child Protection activity
• Looked after Children 
Item 6.
Page 47

Page 48

• Justice and Youth Justice 
4.3 Statistics for Child Protection activity are provided against the academic
calendar which runs from August to July annually.  This is because this data is
gathered and analysed by the Children’s Services Partnership and reported to
the Child Protection Committee (CPC) through the Child Protection Minimum
Data Set.  Appendix 1 begins with Child Protection Q3 from page 1 to 11,
Financial Q1 data is from page 12 to 38.  Any trends or anomalies in this data are
considered through the CPC Data Sub-group and reported accordingly. 
4.4 Statistics for Looked After Children, Justice and Youth Justice are reported over
the financial year which runs from April to March which is the reporting calendar
for this data.  A summary of performance for each of the reporting categories is
provided below. 
Child Protection activity
4.5 At the end of this Child Protection (CP) Quarter 3, 45 children were registered on
the North East Child Protection Register (NECPR).  There is no reliable way of
comparing data with other areas before this information is officially published
nationally. The National data for the reporting year 1 August 2023 to 31 July 2024
was published by Scottish Government on 25 March 2025. 
Looked After Children
4.6 At the end of Financial (Fin) Quarter 1, the number of looked after children is
165.  This includes 4 New Scots (formally Unaccompanied Asylum-Seeking
Children (UASC)) and 4 children who are cared for on a part time basis (Short
Breaks). 
4.7 92.4% (49/53) of children in foster care are cared for by Moray Council foster
carers.  The Carer Recruitment Campaign continues to focus on recruitment of
foster carers and supported lodgings carers.  Resultantly, there has been
increased capacity to have children and young people cared for by Moray
Council foster carers.  Thus, reducing the need to purchase external agency
care.  The Carer Recruitment Campaign is continuing where it is anticipated that
the use of in-house carers will increase.         
4.8 The target for children living with kinship carers is adjusted annually to the
average of comparator authorities which was 28% for 2022/23 (this is a more
than target based on the assumption Kinship care is preferable, where it is safe
and appropriate, to non-family care).  Currently 23% of looked after children in
Moray are in approved Kinship care with family members.  Moray is currently 5%
below this average.  Resultantly, work continues to strengthen practice, ensuring
children, at the point of allocation, have a holistic extended family map
produced, regularly updated, providing clear information on Kinship care options
in the event short breaks or alternative care may be necessary in the future. 
4.9 22.4% (37/165) of Looked After Children are cared for in residential care.  The
target for this indicator (this is a less than target based on the assumption foster
care and kinship care will be the preferred option when it is safe and
appropriate, where possible) is adjusted annually to the average of comparator
authorities (17.5% for 2022/23).  This figure includes four young people who are
Page 48

Page 49

cared for on a part-time (short breaks) basis.  For illustrative purposes on
performance, excluding those who have short breaks (children and young
people who are in the care of their families) the figure is 20% (33/165) which is
2.5% higher than the average of comparator authorities.  In common with most
of the comparator local authorities, Moray is higher than the Scotland national
average percentage of 10%. 
4.10 88% of brothers and sisters in Foster Care and Kinship Care remain together with
at least one sibling.  The Maintaining Relationships Project is developing an
approach and policy to ensure brothers and sisters can remain together as far as
possible and where this is their assessed needs.  Due to resource limitations,
this is much more difficult to achieve when there is need to accommodate large
family groups (3 or more children). 
4.11 For New Scots, Moray has not adopted the residential homes model used by
other local authorities.  Moray’s model comprises of a combination of local
authority housing and supported lodgings care and support.  As such, the
uncertainty regarding the future numbers of New Scots should not have an
impact on residential care capacity in Moray. 
Justice and Youth Justice 
4.12 At the end of Financial (Fin) Quarter 1, there were 507 people supported by
Justice and Youth Justice Services of whom 46 are “care experienced” young
people (CEYP), Youth Justice, 13 and Justice, 33. 
4.13 Overall, the number of CEYP in Justice and Youth Justice Social Work has
consistently remained below 12% since 2023.  A very slight rise of 0.5% from
Financial Quarter 4 relates to a reduced number of open cases overall, not an
actual rise in the number of CEYP open to the services. 
4.14 Most individuals supported by Youth Justice and Justice Social Work are male
(86% Justice Social Work, 82% Youth Justice).  Gender responsive support is
offered to females taking account of research and data indicating women in the
justice system are more likely to have experienced trauma and more likely to be
a sole carer of a child or family member. 
4.15 The Justice Social Work Service submitted 100% of reports to Court by their due
date.  This includes requests from Moray’s local Court and nationally. 
Policy, Development and Commissioning
4.16 In line with national direction of travel, Children’s Social Work Service wishes to
move towards the inclusion of personal outcomes and impact within its
performance reporting to the MIJB. Personal outcomes are those that matter to
people receiving services, linking to national indicators; they constitute the
impact of supports provided by the Service. 
4.17 Following initial scoping and benchmarking, a test of change led by the Policy,
Commissioning and Development Team has been agreed to be taken forward.
The exercise will use a simple method of gathering the views of the children and
families the service works with in relation to progress made towards their
personal outcomes. The details of the test of change as well as other
Page 49

Page 50

developments and commissioning in the Service are on pages 25-35 in
Appendix 1. 
5. KEY MATTERS RELEVANT TO RECOMMENDATION 
5.1 Detailed charts and performance indicator data is attached in Appendix 1. 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP) and Moray Integration Joint Board
Strategic Plan “Partners in Care 2022 – 2032”
This report notes that a review of key performance indicators is currently
being developed in respect of the wider service functions that will align
with key priority areas across the Children’s Services partnership. 
(b) Policy and Legal
None arising as a direct result of this report. 
(c) Financial implications
None arising as a direct result of this report. 
(d) Risk Implications and Mitigation
None arising as a direct result of this report. 
(e) Staffing Implications
There are no proposed changes to the staffing or reporting relationships. 
(f) Property
None arising as a direct result of this report. 
(g) Equalities/Socio Economic Impact
None arising as a direct result of this report. 
(h) Climate Change and Biodiversity Impacts
None arising as a direct result of this report. 
(i) Directions
None arising as a direct result of this report. 
(j) Consultations
Children, Families and Justice Social Work Senior Management Team. 
7. CONCLUSION 
7.1 This report provides the MIJB with an overview of the performance of
specified local and National indicators. 
Author of Report:  Jim Lyon, Interim Chief Social Work Officer/Head of Service  
Background Papers:  Appendix 1
Page 50

Page 51

APPENDIX 1
CHILDREN & FAMILIES AND JUSTICE SOCIAL WORK - QUARTER 1 (APR-
JUN 2025) PERFORMANCE REPORT
PLEASE NOTE THIS REPORT IS SPLIT INTO TWO SECTIONS. THE FOLLOWING SECTION
USES THE ACADEMIC CALENDAR (1 AUG – 31 JULY).  THE INFORMATION PRESENTED
REPRESENTS CHILD PROTECTION (CP) QUARTER 3 WHICH IS LATEST AVAILABLE DATA
(FEB-APR 2025).
At the end of the CP Quarter 3, 832 contacts, enquiries and referrals were made to the
Access Team for 657 children (as per graph 1).
Graph 1: CP Quarter 3 - Referrals received by Access Team
The potential referral routes are
Social Work, SCRA, Police, Courts,
Education, Health, 3rd Sector,
community, family and young person. 
When a referral has been received it
can be categorised as:
IRD – immediate child protection
concerns.
Enquiry – information gathering to
determine next steps (if any).
Assessment of need – team will
conduct a child in need assessment.
Number of contacts, enquiries and referrals can be more than the number of children, as
they can come from a range of sources about the same child.
Future reporting shall identify accepted referrals which is the key process for
consideration of the need for follow up actions.
From the point of referral, our focus is on developing genograms and identifying
networks of supportive family members and friends who can contribute to the child or
young person’s safety and wellbeing. We are also working in collaboration with
colleagues from Children 1st to facilitate Family Group Decision Making meetings.
These meetings aim to build a robust support network around the child, helping to
maintain safety and, where appropriate and safe, prevent the need for children
becoming accommodated into Council care.
Pie chart 1: Sources of referral 
0
50
100
150
200
250
300
45689 45717 45748
254
288 290
218 210 229
REFERRALS RECEIVED BY ACCESS TEAM
Referrals: No. in last month Referrals: No of children
Page 51

Page 52

2 | P a g e
In CP Quarter 3, 37% of referrals were from the Police (299), followed by Education 21%
(169), Family and Community 14% (116), Health and Social Work 15% (125), and 13%
coming from other professionals (103) (as per pie chart 1).  Where the number of
referrals is higher than the number of children, this can be attributed to the fact there
can be multiple sources of referrals about a child (e.g. Health, Education and Police). 
This potentially reflects consistent thresholds across the partnership.
There has been a 30% increase in referrals from education since CP Quarter 1.  The
Service Manager is exploring this with the Education Quality Improvement Manager
(QIM), to agree actions for clarity on the threshold of need, support to families at the
right time from the right service, and to understand the increase in more detail. We
continue to work with Education QIMs to support colleagues in schools to ensure
families are receiving the right help at the right time, hence not always reaching social
work thresholds. Similar conversations are being held with the child protection
specialist nurse.
Graph 2: IRDs and number of children subject to an IRD 
Graph 2 shows the quarterly trend in IRDs (between 1 Aug 2024 and 30 April 2025).  An
interagency referral discussion (IRD) is a co‑ordinated inter-agency exploratory
protective process until the point a child protection planning meeting (CPPM) is held, or
until a decision is made that such a meeting is not required or alternative action is
required.
In CP Quarter 3, 57 children were involved in 41 IRDs.   For each quarter, the number of
children is greater than the number of IRDs as each IRD can consider multiple children
within a family. The numbers of IRDs and the number of children involved has
decreased slightly since August 2024.  
0
10
20
30
40
50
60
70
Q1 24-25 Q2 24-25 Q3 24-25
47 40 41
64 66
57
IRDs and No. of Children
No. of  IRDs held in Quarter No. of Children involved
Page 52

Page 53

3 | P a g e
Pie chart 2: Main reasons for IRD 
As per chart above, throughout CP Quarter 3, physical assault remains a consistent
reason for an IRD being held (31, 62%), followed by sexual assault (6, 12%), domestic
abuse (6, 12%), neglect (3, 6%), child sexual exploitation (1, 2%), mental health (1, 2%),
child criminal exploitation (1, 2%).     
Following the IRDs, seven Initial Child Protection Planning Meetings were convened,
and 17 Joint Investigative Interviews were requested.
Graph 3: Joint Investigative Interviewing 
Graph 3 shows the trend across the years 2024/25 for joint investigative interviews and
Scottish Child Investigative Interviews. 
Physical Assault, 31, 62%
Sexual Assault, 6, 12%
Domestic Abuse, 6, 12%
Child Criminal Expl, 1, 2%
Child Sexual Expl, 1, 2%
Drugs, 1, 2%
Mental Health, 1, 2%
Neglect , 3, 6%
Reasons for  IRD
Physical Assault
Sexual Assault
Domestic Abuse
Other reason
Child Criminal Expl
Child Sexual Expl
Drugs
Mental Health
Neglect
13
9
6
13
7 7
13
9
4
7
9
7
11
5
12
8
2 33 3
0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0
4 4 3 2 3
0
2 2 1
3
1 2
4 3 3
5
0 1
9
5 6
11
4
7
11
8
3 4
8
5
7
2
9 8
2 3
0
2
4
6
8
10
12
14
Aug-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25
JII -TRENDS2023-2025
JII: No. of JII by SCIM as decision of IRD JII: No. of JII by 5 day process as decision of IRD JII: No. of children who declined/or did not complete JII
JIIs: No. of SCIM JIIs undertaken 2 per. Mov. Avg. (JII: No. of JII by SCIM as decision of IRD) 2 per. Mov. Avg. (JII: No. of children who declined/or did not complete JII)
Page 53

Page 54

4 | P a g e
Graph 4 – JII & SCIM 
Graph 4 shows the activity of Joint Investigative Interviewing across CP Quarter 3, during
which 19 children were recommended for Joint Investigative Interview (JII); 13 Scottish
Child Interview Model (SCIM) JIIs were completed, 4 children declined to be interviewed,
and 2 young people were spoken with using a “soft approach”. 
Graph 5: Initial Child Protection Planning Meetings (ICPPM) 
Graph 5 shows the trend across the last two reporting years (2023 - 2025) for the
number of Initial and Pre-birth Child Protection Planning Meetings, and the number of
children. The number of children subject to CPPMs is higher than the number of
meetings held, due to some meetings considering family groups.
At the end of CP Quarter 3 of 2024/2025, seven Initial and Pre-birth CPPMs were held for
eleven children, all of whom were placed on the register. 57% were held in timescale of
28 days from the notification of concern. 
To encourage meaningful family engagement in the development of safety plans, some
meetings were rescheduled to enable family participation. This decision acknowledges
delays in meeting timelines; however, it reflects our commitment to strengthening
family involvement which is a crucial factor in securing safety for children and young
people.
All these meetings were held only days later than the anticipated date. 100% of Initial
and Pre-birth CPPMs had parental attendance as a result. 
Children and young people are encouraged to attend their CPPMs, where this is
possible and in their best interest. There were 3 ICPPMs where 7 children or young
person could attend. One young person chose to attend their meeting. However, the
7
9
7
11
5
12 13
2
4
7
9
7
11
5
12
8
2 3
0 0 0
3
1 2
4 3 3
5
0 1
4
8
5
7
2
9 8
2 3
0
5
10
15
Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25
JIIS Using SCIM
JII: No. of children subject to a JII as decision of IRD JII: No. of JII by SCIM as decision of IRD
JII: No. of JII by 5 day process as decision of IRD JII: No. of children who declined/or did not complete JII
JIIs: No. of SCIM JIIs undertaken
32
41
17
12
22
10 11
16
22
10 7
12
6 7
0
5
10
15
20
25
30
35
40
45
Q1 Q2 Q3 Q4 Q1 Q2 Q3
Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct Nov-Jan Feb-Apr
2023/24 2024/25
NO OF CHILDREN & UNBORN - ICPPMS
Number of children subject to Initial and Pre-Birth CPPMs Number of Initial and Pre-Birth CPPMs
Page 54

Page 55

5 | P a g e
young people who did not attend had a range of opportunities to take part in their
meeting by having their voice heard. The Reviewing Officer visited 2 young people in
their home prior to their meeting; one young person had their views captured by their
Moray Rape Crisis support worker and 2 had their views captured by their social worker. 
Graph 6: Conversions from IRD to ICCPM 
Graph 6 above shows the trend from 2023 through to 2025 and specifically CP Quarter
3, where the conversion rate from ICPPM to Child Protection Registration was 100%.
A small percentage of children discussed in IRDs progress to ICPPMs as the focus must
be supporting parents and carers to create safety for their children.  This requires
periodic review to ensure IRDs are operating effectively as they are resource intensive.
There must be clear understanding of the reasons IRDs are being held, for example,
large numbers of IRDs resulting in very small numbers of investigations present
potential risks in responding to children in greatest need of protection.
During CP Quarter 3, there were 20 Review Child Protection Planning Meetings (RCPPM)
held for 36 children, where their circumstances were reviewed with their families, lead
25
39
19 14
34
15 17
78 83
94
75
100 100 100
0
20
40
60
80
100
120
Q1 Q2 Q3 Q4 Q1 Q2 Q3
Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct Nov-Jan Feb-Apr
2023/24 2024/25
CONVERSIONS FROM IRD TO ICCPM
% IRD to Initial and Pre-Birth CPPMs % Initial and Pre-Birth CPPMs to Registration
832
referrals
41 IRDs
7 ICPPMs
The
conversion
rate from
referral to IRD
is 4.9%
The
conversion
rate from IRD
to ICPPM is
17%
Page 55

Page 56

6 | P a g e
professionals and independent advocates, to assess if the identified risks had been
sufficiently reduced to consider removing the child’s name from the register. 13 of the
RCPPMs held in this quarter were first reviews, of which, 100% were held within the 6-
month timescale. 7 were subsequent reviews and 72% of these were held in timescale.
The two not held in timescale were to support family attendance. 
As above, referrals from education colleagues have increased, prompting reflection to
better understand this trend. Collaboration with partner agencies is essential to ensure
timely and appropriate support is available. Early support aims to prevent unnecessary
escalation to the threshold for social work involvement and ensure referrals are directed
to the most suitable sources of support.
Graph 7: Child Protection Registration (CPR) Trends 
The trend is depicted across Graph 7 from 2023 - 2025 and shows in CP Quarter 3, that
26 children were de-registered and eleven new children were registered.  This meant at
the end of CP Quarter 3, the number of children who were on the (CPR) had decreased
by 15 (from 60 to 45).
Children and young people can be removed from the CPR for a variety of reasons related
to the elimination or reduction of risk. In this quarter, the most prevalent reason was
(14) children and young people had Compulsory Supervision Orders in place and the
measures attached to the order were protective. For some, this included measures of
residence away from parental care.   
A significant reduction in risk was identified for 11 young people whose protection plans
had successfully reduced the risk of significant harm. For these children and young
people, ongoing Child in Need planning is in place to sustain progress and ensure that
supports are in place to support positive long-term outcomes. 
25
34
16
9
22
10 11
50
79
70 66 69
60
45
9 5
25
13 19 19
26
0
10
20
30
40
50
60
70
80
90
Q1 Q2 Q3 Q4 Q1 Q2 Q3
Aug-Oct Nov-Jan Feb-Apr May-Jul Aug-Oct Nov-Jan Feb-Apr
2023/24 2024/25
CHILD PROTECTION REGISTRATION TRENDS
Number of Registrations Number on Register Number of De-Registrations
Page 56

Page 57

7 | P a g e
Graph 8: Child Protection Registration Comparator Authority Trends (up to 31 July
2024) 
Graph 9: Number of Child Protection Registrations Comparator Authority Trends (to
31 July 2024) 
Chart 10: Number of Child Protection Deregistration Comparator Authority Trends
(1 August 2022 to 31 July 2023)  
Page 57

Page 58

8 | P a g e
Pie chart 3: Reasons for new child protection registrations in the reporting period 
Pie chart 3 depicts the reasons that children were added to the CPR in this quarter. The
reasons for new registrations often differ from the reasons for having an IRD. This is
because, throughout the information-sharing process and child in need assessment, a
more comprehensive understanding of the family's needs and a clearer perspective on
risk and safety emerges.
In Quarter 3, children being impacted by parental mental health was the most prevalent
concern (8 children and young people) followed by emotional abuse (4 children and
young people) and parental drug use (3 young people). 
We have experienced a significant rise in recent years for parents struggling with their
mental health and with diagnosis on the personality disorder spectrum. The presenting
unpredictable behaviour for parent and impact for children has contributed to
registration and children moving to the care of family or local authority care. Our
partners in adult mental health services have provided development sessions for
childcare social workers, to raise awareness of their approaches to support adults with
this diagnosis, close partnership working with health and social work colleagues in
mental health is key to reducing risk and supporting families holistically.
We are working closely with police colleagues due to rising concerns of drug selling and
county line activity with some linkage to organised crime. This is having an impact on
safety for some children within their families. 
Page 58

Page 59

9 | P a g e
Pie chart 4: Child Protection Concerns 
Pie chart 4 depicts all of the reasons for children being placed on the CPR at the end of
CP Quarter 3. Neglect, Child Affected by Parent or Carer Mental Ill Health, Parental Drug
Use, Domestic Abuse, and Emotional Abuse are the main child protection concerns
noted. *Note there may be more than one concern documented for each child.
Graph 11: Family Groups 
As shown in Graph 12, at the end of CP Quarter 3, there were 11 family groups
consisting of one child, six family groups with two children and 7 family groups of three
or more children on the child protection register.  
10
7
7
7
7
6
13
10
11
0 2 4 6 8 10 12 14
Feb-25
Mar-25
Apr-25
FAMILY GROUPS ON MORAY CPR
CPR Family Group: Single child CPR Family Group: 2 CPR Family Group: 3 or more
Page 59

Page 60

10 | P a g e
Graph 12: Previous Registrations
At the end of CP Quarter 3, fourteen children on the Child Protection Register had one
previous registration, and nine children had two or more. This data highlights a pattern
of recurring child protection concerns for some children and families. 
The core objective of Children and Families and Justice Social Work is to ensure the
safety and wellbeing of children through timely, proportionate, and effective support.
Repeat registrations indicate that, for a small number of children and families, risks
have re-emerged or were not sufficiently reduced following previous support. 
To address this, the service is committed to: 
▪ Strengthening post-registration support to sustain safety and prevent re-
escalation.
▪ Improving multi-agency collaboration to ensure families receive the right help at
the right time, reducing reliance on statutory support.
▪ Reviewing thresholds and decision-making processes to ensure that registration
and de-registration are based on clear, evidence-based criteria 
▪ Learning from repeat registrations to identify systemic gaps and improve
practice. 
This analysis informs ongoing service development and quality assurance activity,
ensuring that supports are not only protective but also preventative—supporting
families to make lasting changes that keep children safe. 
0
5
10
15
20
25
30
Q1 Q2 Q3
27
22
1414 15
9
PREVIOUS REGISTRATIONS ON MORAY CPR
No. of children with 1 previous registration No. of children with more than 2 previous registration
Page 60

Page 61

11 | P a g e
Graph 13: Time on Moray Child Protection Register 
Regarding Graph 13, the aim is to support families make changes to safely parent their
children within a more focused time frame i.e. 12 months. If risks have not been
significantly reduced, then alternative safeguarding measures should be considered. If
risk has been sufficiently reduced, and the child is experiencing safe and good enough
care, then de-registration should be considered, with the evidence understood and
agreed by partners.
Children and young people who have been on the CPR for over 1 year are reviewed
within the service. 
Graph 14: Age of children on the Child Protection Register 
Graph 14 shows the trend for 2024/25 against CP Quarter 3 data.  The consistently
higher prevalence in the last year, of children aged 5-10 years highlights the need for
earlier support and diversion services, ensuring this is provided at the earliest stages of
a child’s development.  The number of young people aged 16 years has remained static
throughout the Quarter. 
6
3
15
15
25
1
5
7
17
18
1
5
9
13
17
0 5 10 15 20 25 30
> 2 years
18 mths < 2 years
1 year < 18 mths
6 mths < 1 year
<6 months
TIME ON THE MORAY CPR
Apr-25 Mar-25 Feb-25
0 1
4 4 3
1 0 1
3
20 21
17 18 19 19 19
12 11
25 25 25 26
23 23
26
21
1919
16
20 20
17
15
17
12
10
1 2 3 2 2 2 2 2 2
0
5
10
15
20
25
30
Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25
AGE OF CHILDREN ON MORAY CPR
Unborn 0-4 5 - 10 11 - 15 16+
Page 61

Page 62

12 | P a g e
THE FOLLOWING SECTIONS REPORT AGAINST THE FINANCIAL QUARTER (APR-JUN
2025)
Graph 15: Number of children looked after away from home and at home 
Graph 15 identifies that at the end of Financial (Fin) Quarter 1, there were 165 children
who were looked after by Moray which is an overall reduction from 171 to 165. 
There was an increase in the number of newly accommodated children in 2024/25 and
2024/25, which is being analysed through the ‘Critical Mass’ work which will support a
better understanding of this data and identify mitigating actions. In Quarter 1 the
number of newly accommodated children was 5. 
As such, further investigation of our reporting is required to account for this decrease in
the overall number of looked after children given the high number of newly
accommodated children.
However, it remains positive that there is a potential decreasing trend in the number of
looked after children in Moray.  
Pie chart 5: Care setting categories 
At the end of Fin Quarter 1, 41% of children were in family settings at home or in kinship
care with 59% in other settings such as foster care or residential houses. This has
remained a stable figure highlighting many looked after children have been able to
remain within their network of family and friends. 
172
177 179 175 173 175 177 176 175
180 178
171 171 170
165
155
160
165
170
175
180
185
LAC - AWAY FROM HOME & AT HOME
Page 62

Page 63

13 | P a g e
There has been an ongoing focus on kinship care as an option which has been
supported by Family Group Decision Making. With this, Moray has been able to avoid
children being cared for out with their familiar network of family and friends.       
Foster care with Moray carers (49) and kinship care (42) are the highest categories
followed by children looked after at home (26).  The children’s houses in Moray (11)
Cala, Rowan Lea and Land Street, continue to operate at full capacity (14) where three
young people are over 18, subject to Continuing Care, and not recorded as looked after
children.  
This is significant as it enables the vast majority of looked after children in Moray to
maintain vital connections within their local community, including family, friends,
education, and healthcare.
A significant majority of young people are in family-based care (124, 75%) rather than
residential care (41, 22%). The Carer Recruitment Campaign has seen new foster carers
and supported lodgings caregivers approved to support young people remaining in
Moray in family-based care settings. There remains the commitment to support young
people in family-based care settings. This includes supporting families to identify and
promote kinship care options via Family Group Decision Making processes.  
At the end of June 2025, 88% of brothers and sisters in Foster Care and Kinship Care
remain together with at least one sibling. The National Average is 79%. Where brothers
and sisters are not together, this is for a variety of reasons including lack of suitable
resource, an assessed need to live separately or diverse needs.  Maintaining
relationships between brothers and sisters remains a priority for the service.        
At the end of Fin Quarter 1, 21% of our looked after children were cared for on a full-time
basis in residential care.  If short breaks are included the figure of young people in
residential care increases to 23%.  
As such, Moray is 3.5% above the average indicator when considering full-time care on
its own and 5.5% above if short breaks are included. There has been an impact of the
increase in newly accommodated young people in in 2024/25 where there has been an
associated increase in the use of residential care as foster care is at capacity in Moray.  
Aside this we will be implementing the revised Continuing Care Procedure. This is
aligned with our clear plan to support young people in their transition to adulthood and
after care, allowing them to remain in their family, fostering and residential home as
non-looked after children up until the age of 21. 'Staying Put' is our default position and
future reporting will include the outcomes realised in numbers of looked after children
and young people likely reducing to further secure a young person's future care. This
provides a stable base from which care experienced young people can move to
adulthood and independence.  
Moray hosts four young people who are New Scots (formerly Unaccompanied Asylum-
Seeking Children) via the National Transfer Scheme.  These children and young people
are assigned to Moray by the Home Office and are then supported by the Throughcare
and Aftercare Team. They are counted as looked after children to ensure they receive
full support.  Initially, these young people are in Supported Lodgings or Supported
Accommodation care settings.  The team continues to successfully support them to
move into their own independent housing once they have been granted asylum. 
Page 63

Page 64

14 | P a g e
Moray also hosts a number of other New Scots but they are not all are looked after
children due to their age and/or asylum status.   
The number of new arrivals of New Scots in Fin Quarter 1 was zero which was the same
figure for Fin Quarter 4. COSLA and the Home Office cannot yet determine the reason
for this reduction and whether it is a short or long-term trend. The resource allocation
system in Moray means there are the resources to support New Scots including any
future increases in numbers.      
Graph 16: Moray foster care households 
At end of Fin Quarter 1 there were 53 children living in foster care, with 49 (92.5%)
children living with Moray Council foster carers and 4 (7.5%) living with independent
foster carers. This identifies that, despite the challenges in recruiting carers both locally
and nationally, Moray has ensured that most children are living with in-house foster
carers.         
Of our 36 fostering households, 80.5% are actively caring for a child.  Not all fostering
households have children living in their care.  At the end of Fin Quarter 1 this comprises
seven (19.5%) in total.  This is a small number due to family circumstances or matching
considerations of their registration approval where foster carers are inactive for a short
period of time.
The Fostering Team has been broadening the approval range and capacity of Moray
foster carers, with additional support and advice, to enable care for a wider group of
children and maximise capacity.   
35 36 37 37 36 35 36 36 36
27 27 25 25 28 31 31 30 29
0
5
10
15
20
25
30
35
40
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
2023/24 2024/25 2025/26
MORAY - FOSTER CARE HOUSEHOLDS
No. of Moray Council Fostering Households
No. of Moray Council Foster Carers with 'Active' placements
2 per. Mov. Avg. (No. of Moray Council Fostering Households)
Page 64

Page 65

15 | P a g e
Graph 17: Children who live in foster care   
Graph 17 identifies that at the end of Fin Quarter 1, there were 49 children cared for by
Moray foster carers, which is a decrease from Fin Quarter 1 in 2024 which was 51. 
However, this includes some quarterly fluctuations where the pattern is relatively
stable.  
The number of approved Moray foster carer households for children has remained
stable.  Although the carer recruitment campaign is resulting in new fostering
households, this is balanced by other foster households ceasing or changing the type of
fostering they provide. The challenge in recruiting and retaining foster carers is both a
local and national issue.  The recruitment campaign is significant in recruiting foster
carers accompanied by work to achieve greater retention rates, focused on supporting
foster carers with improved supervision, training and finances.
The Fostering Team has now introduced a simplified levels system for foster carers. This
has reduced the number of levels from four to two and has introduced short term
enhanced payments for the most complex care arrangements. This new system has
meant that new foster carers will start a higher fee than previously which it is
anticipated will support the foster carer recruitment strategy.      
Young Carers work is reported to other Integration Joint Board Committees which is
being reviewed with a view to inclusion in this report.          
Graph 18: Kinship care settings 
Kinship care is split into two groups: pre-approved kinship homes awaiting
presentation at the Kinship Panel for approval and kinship households already approved
31 29 29 29 29 28 30 28 25 26 26 25 30 27 28
30 32 33 32 32 31 33 31 32 32 32 31
34 31 31
12 9 7 8 8 8 9 9 5 5 5 5
5
6 7
0
10
20
30
40
50
60
70
80
Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25
Kinship Care Settings
Kinship: No. of households providing Kinship Placements Kinship: No. of Children in Approved Placements
Kinship: No. of Children in Pre-Approved Placements
Page 65

Page 66

16 | P a g e
at Panel.  Moray is seeking to increase the numbers of kinship households. This is to
ensure more children and young people can remain within their own communities and
network of family and friends.  It is envisaged that the numbers of kinship households
will increase via the use of, for example, Family Group Decision Making processes. 
We are reviewing our Kinship Policy in line with revised guidance form the Scottish
Government. Our basis for this review is to provide Kinship Assistance to children who
move to the care of a relative or friend as a decision of a social work led child's plan and
to widen our support for Kinship Carers to include those who have caring
responsibilities as informal arrangements. The Policy will consider the Eligible Child as
primary consideration, which will include the assistance to young people over 16 who
are transitioning from child to adulthood. Creating and implementing a Policy that
widens our support to Kinship families through the child and young person's childhood
to adulthood will provide confidence for potential kinship carers and hopefully lead to
an increase in prospective kinship carers feeling able to consider caring for a friend or
family members child.     
Graph 19: Residential care settings 
Residential care is divided into those in residential care in Moray and those outwith
Moray.  Children cared for in Moray live in the authority's own children’s houses, Cala
and Action for Children’s two houses in Buckie and Elgin.  The figure for this category is
11. As above, the children’s houses operate at capacity (14) including three young
people in Continuing Care. Out of Area care tends to be specialist residential houses or
residential schools.  There has been a consistent focus on providing this care in Moray
where possible, so children remain close to their families and support network.  The
figure for this category is 21.
Work is underway to reduce the number of young people in Out of Area care which is
expensive and does not geographically support young people in maintaining
relationship in Moray including health, education, family and friends. We are working
with Action for Children and the new transition project. The project will provide targeted
support for young people moving on from residential care in Moray or those returning to
Moray. This is the early stages of implementation, with a transition worker joining the
team around the child or young person. 
Page 66

Page 67

17 | P a g e
Residential care settings can be the correct care setting for some children and young
people, often due to previous unsuccessful multiple family care arrangements.
However, in most cases, a family-based setting is preferrable as it better prepares
young people for adulthood as they have a positive model of family life. For those young
people in residential care, there is significant preparation via independent living skills to
support them in the transition to adulthood.     
Graph 20: Through Care, After Care and Continuing Care 
As illustrated in Graph 21, as at 30 June 2025, there were 74 young people receiving care
from the Through Care After Care (TCAC) Team including 13 receiving Continuing Care
support. It is anticipated that the numbers of young people subject to Continuing Care
will increase as this approach becomes more embedded in Moray. This is particularly as
there will be a likely increase in the use of Continuing Care for 16- and 17-year-olds and
for those in residential care which is supported by a refreshed policy.   
The team is divided into three sections: 
• Through Care: Young people receiving support to plan and prepare for
independence.
• After Care: Young people who have left care and receive support whilst living
independently or in a continuing care arrangement.
• Continuing Care: Young people who choose to remain in their care arrangement
beyond their16th or 18th birthday until they are 21, although it can be in place
from 16.  These young people cease to be formally looked after by Moray Council
but receive the same support and care as when they were, providing a more
natural and seamless transition to adulthood. There is a focus on continuing care
to ensure young people in different care settings are given the opportunity to
remain where they are living potentially until the age of 21.  This is a key
responsibility for the organisation and partners as corporate parents.   
The team is responsible for supporting New Scots (formerly Unaccompanied Asylum-
Seeking Children) via the National Transfer Scheme.  This is an increasing workload for
the team, which is dependent, in part, on the numbers of young people arriving in Kent,
making future forecasting a significant challenge.      
29
35 37
14
19
24
9 11 13
0
5
10
15
20
25
30
35
40
Apr-25 May-25 Jun-25
THROUGH CARE AFTER CARE
TCAC: Open as Through Care TCAC: Open as Aftercare TCAC: Open as Continuing Care
Page 67

Page 68

18 | P a g e
The team offers considerable support to young people after they leave care (After Care)
up to the age of 26. There is a commitment to offer the same support birth families
provide for young people who are transitioning into adulthood. This is a key element of
Moray Council’s and Health and Social Care Moray’s responsibilities as Corporate
Parents.   
Other reporting areas being considered are positive destinations: work, education,
training, and accommodation, and outcomes for New Scots. 
Positive Destinations for Looked After Children
A new area of reporting is in relation to positive destinations. This relates to school
leaving looked after children (S4-S6) moving on to education, employment and training.
Graph 20 identifies the trend over the last 5 years which has produced a fluctuating but
overall reducing picture. 
Within the Corporate Parenting Strategic Group there is a focus on positive destinations
to consider why the outcomes for looked after children in this area are not improving. It
is important to note that the numbers of young people are small where they can be
easily identified, tracked and supported. The Throughcare & Aftercare Team have been
working with colleague in Education in order to support this group of young people.  
Graph 20 provides data until 2023/24 where the reporting for 2024/25 is awaited. An
update can be provided in future reporting to identify whether there has been an
improvement for the outcomes for these young people.                       
Graph 20: Positive Destinations 
Maintaining Relationships Project 
The Maintaining Relationships Project has now produced practice Guidance which was
agreed by the GIRFEC Leadership Group. This provides a framework for local authority
staff and care experienced young people to safely maintain relationships within a
flexible and supportive structure. The formal launch is taking place on 28 October at
Moray College where there will be a combination of presentations and stalls.
Page 68

Page 69

19 | P a g e
The project will be supported by the Corporate Parenting Strategic Group which is
developing tools in order to report on its impact and the outcomes for care experienced
young people. These outcome measures being developed will be included in future
reporting. 
As part of this, the Children’s Houses in Moray are currently developing tools to monitor
outcomes for young people maintaining relationships. There has been considerable
feedback and input from young people to inform this process. A selection of this is as
follows:
• “Have communication in place about how adults will keep in touch when I move out.
It would be good to know how things will be.”
• “I like people from the children’s house popping in to see me.”
• “The children’s house picks up the phone to me. I go there to visit; I’ve got lots of
memories there. I like going because of the people I know there, I like to talk about
the past and see what they’ve been up to. It would be good to meet up with them for
a burger or, something.”
• “I still like having someone there for me. I’ve got a couple of appointments coming
up that they’ll come with me.”
• “It wasn’t really cooking and cleaning I needed. I needed support to go out and take
part in things going on.” 
Justice Services and Youth Justice. 
Graph 21: Care experienced young people supported by Justice Services 
Nationally, care experienced young people (CEYP) are overrepresented in the Scottish
Justice Systems.  At the end of Fin Quarter 1, 9% (46 of 507) were CEYP (up to age 26) in
the Justice System (Youth Justice 13, Justice Social Work 33) as depicted in graph 22.  
This figure has consistently remained below 12% since 2023 and the very slight rise of
0.5% from Fin Quarter 4 relates to a reduced number of open cases overall, not an
actual rise in the number of CEYP open to the services. The aim continues to be to
address identified needs and risks to reduce re-offending rates and maximise support,
including existing relationships,  Research informs that early entry or prolonged
exposure to the criminal justice system can draw children into the system rather than
rehabilitate and divert from the system, therefore the use of short term interventions are
prioritised where possible.  Children who are remanded or sentenced to custodial
sentences in a secure care facility are included within the numbers above. 
450 440 449 443 466 472 478 477 492 490 497 498 488 472 474
37 35 31 34 34 36 40 40 44 46 48 46 39 37 457.58 7.29 6.39 7.23 6.82 7.17 7.8 7.8 8.3 8.6 8.8 8.5 8.7 9.4 8.8
0
100
200
300
400
500
600
Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25
Care Experienced Young People open to Justice Services
Open to Justice Team Open to Youth Justice %  CEYP open to both MYJ and JS Expon. (Open to Justice Team)
Page 69

Page 70

20 | P a g e
Graph 22: Age of children in Youth Justice 
The average age of a child receiving Youth Justice services through this quarter is 15
years old which is slightly higher than previous reporting, and at the end of Fin Quarter 1
there are no under 11’s open to the service.  This is positive in that the needs of our
younger children are being appropriately met by other services.    Most of the work
continues to be with children aged 11 to 15 years and is undertaken in a multi-agency
way, working closely with key partners such as Police Scotland, education services and
our local children's houses.
Whilst the team works with all schools throughout Moray, it has strong links with Moray
Social, Emotion and Behavioural Needs Service (SEBN) where support is offered for
social, emotional and behavioural needs.
There have been a very small number of young people aged over 18 years in the Youth
Justice Service over Fin Q1, where support has been delivered jointly with the Justice
Social Work team.  Planned transitions and joint working between these teams
minimises the impact on the young person.
Pie chart 6: Gender of individuals in Youth Justice   
0
20
40
60
80
100
0 0 1 1 1 0 0 0 2 1 1 1 0
22 21 21 21 21 21 25 28 26 27 24 22 24 30
16 13 15 10 7 7 8 9 15 18 16 14 11 122 2 1 0 1 0 3 3 3 3 2 2 1 1
40 36 37 32 30 35 36 40 44 50
43 39 37 43
Ages of Young People in Youth Justice
YJ: Age Band: 5-10 YJ: Age Band: 11-15 YJ: Age Band: 16-17
YJ: Age Band: 18+ YJ: No. open to Youth Justice
YJ Gender: Male,
38
YJ Gender:
Female, 7
GENDER OF YOUNG PEOPLE IN YOUTH JUSTICE
YJ Gender: Male YJ Gender: Female
Page 70

Page 71

21 | P a g e
Pie chart 7: Gender of individuals in Justice Services 
At the end of Fin Quarter 1, most individuals supported by Youth Justice were males
accounting for 82% of children and young people supported by the service.  
In Justice Social Work 14% of individuals supported by the service were females, which
has increased slightly over the past year.  It is recognised women in the justice process
are more likely to have experienced trauma and are also more likely to be a sole carer
for a child or family member.  
In line with The Promise, Justice Social Work is committed to keeping women in their
local communities where it is safe to do so and provide robust alternatives to custodial
sentences.  Currently the team offers a gender responsive service which includes a
weekly women’s group and a woman only unpaid work group.  Support is offered in
partnership with other services to promote opportunities for individuals to engage with
community resources which will be available beyond their time within the justice
service.   Work continues to capture the views of individuals to evaluate the impact of
this service and shape its development.  Recent feedback includes:                                                             
Justice: Male,
416
Justice: Female ,
58
Gender of  People in Justice Services
Justice: Male Justice: Female
Page 71

Page 72

22 | P a g e
Graph 23: Justice social work reports (JSWR) 
Justice Social Work reports (JSWR) remain a priority to reduce any delays in sentencing
and for Fin Quarter 1 the target of 100% on time has been met.  Whilst reports are
prepared at the request of any Court for an individual living in Moray, most reports are
submitted to Elgin Sheriff Court.  
Completion of Court reports on time results in appropriate sentencing for individuals
which addresses their current assessed risks and needs, and reduces time spent on
remand where a community sentence is imposed.  It also importantly supports a timely
outcome for victims of offences.
Pie chart 8: Justice Report Types 
In addition to a standard JSWR report the Court may request additional assessments
such as a Drug Treatment and Testing Order (DTTO) assessment and a Restriction of
Liberty Order (ROLO) assessment as shown in pie chart 8.  The imposition of a ROLO or
DTTO can be a direct alternative to custody so effective assessments for these Orders
can offer a robust community-based disposal.  
At the end of Fin Quarter 1 there were 10 DTTO’s in progress which involves at least two
appointments per week for testing and supporting identified needs, and group work in
this area is being considered.
130
107 107
138 141
121
95 95
121 119
100 100 100 100 100
0
20
40
60
80
100
120
140
160
Q1 Q2 Q3 Q4 Q1
JUSTICE SOCIAL WORK REPORTS (JSWR) - SUBMITTED ON TIME
No. Social Enquiry Reports submitted on Time No. of People % of Reports on time
4, 3%
58, 46%
63, 50%
1, 1%
TYPES OF REPORTS
JSWR DTTO Assessment
JSWR ROLO Assessment
JSWR Standard
Page 72

Page 73

23 | P a g e
Graph 24: Structured deferred sentences (SDS) 
An SDS is a flexible provision with structured social work support for an individual after
conviction but prior to sentencing.  Successful completion of an SDS reduces the need
for a statutory Court Order, in turn reducing the overall length of time an individual is
supported by the service.  The number of in SDS disposals in Fin Quarter 1 has risen
slightly but remain lower than in the previous year likely due to increases in other early
intervention measures. 
Graph 25: Bail supervision 
Bail supervision is an alternative to remand and the priority for this in Moray is women,
young people, those with caring or parental responsibilities and those with issues
relating to mental health or addictions.  Assessments are undertaken for all people
where bail is being opposed by the Procurator Fiscal and are provided on the same day. 
There is a small reduction in the number of assessments requested in Fin Quarter 1 and
a slight decrease in bail supervision orders imposed.  There continues to be a significant
number of assessments which do not result in bail being opposed and work is being
undertaken nationally to understand trends, but data is not yet available to compare. 
The prison population in Scotland remains high, and bail supervision is one area of work
which is hoped will assist in reducing these numbers whilst offering more positive
outcomes for individuals within their local communities.  There is a plan to use the
Outcomes Star as a model for identifying the impact of this work.
0
10
20
30
40
50
Q1 Q2 Q3 Q4 Q1
2024-25
21
8 10 11 16
21
6 10 11
16
STRUCTURED DEFERRED SENTENCES (SDS)
No. of Structured Deferred Sentences imposed No. of Individuals with SDS imposed
0
50
100
Q1 Q2 Q3 Q4 Q1
2024-25 2024-25 2024-25 2024-25 2025-26
59 62 50 47 44
14 13 17 12 8
14 12 17 2 8
Bail Supervision
No. of requests from Court for Bail Supervision No. of Bail Supervision cases commenced
No. of individuals commenced with Bail Supervision
Page 73

Page 74

24 | P a g e
Graph 26: Community Payback Orders with supervision requirement 
Fin Quarter 1 has seen an increase in the imposition of Community Payback Orders
(CPO).  Most individuals made subject to a CPO are seen on the day of sentencing, for
those where this has not been possible, an appointment with their allocated social
worker is made within seven days of an Order being imposed.  There has been an
improvement in the number of individuals seen within these timescales and additional
support offered to staff when completing data to improve accuracy.
Where an individual is subject to an Unpaid Work Requirement there is a focus on
providing opportunities to develop skills as well as contribute to our local communities. 
Feedback from this service includes:                                                    
Diversion from Prosecution
Diversion from Prosecution (DfP) allows someone accused of offences to be dealt with
outside of the formal justice system. Successful completion of a diversion from
prosecution means an individual will not have a conviction for the alleged offence which
may impact their current or future employment or education alongside other significant
areas of their life.  
The Justice Social Work team undertakes all assessments of suitability; however, the
Youth Justice team aids and supports young people aged 16 and 17.  The referral rate
varies which is a result of the process of cases being marked by the Procurator Fiscal. 
There can occasionally be delays in the commencement of these cases where
additional agreement is required from the Procurator Fiscal, e.g. an extended period for
completion.  In comparison to Fin Quarter 4 last year there is a small increase in
assessments completed for males and a small decrease in assessments completed for
females.  
Outcomes Star data indicates most individuals feel an improvement in their wellbeing at
the end of a DfP.  Information contained within exit questionnaires include:
41
53
62 59
69
35
49
55
41
58
Q1 Q2 Q3 Q4 Q1
2024-25 2024-25 2024-25 2024-25 2025-26
CPOS WITH SUPERVISION
No. of new CPOs with Sup Req No. seen by Supervisor within 7 days 2 per. Mov. Avg. (No. of new CPOs with Sup Req)
Page 74

Page 75

25 | P a g e
Work is being undertaken to improve the recording and examination of this data and
feedback.
Finalised updated guidance for DfP is awaited from the Scottish Government, however
there are plans from Community Justice Scotland to provide training to all staff which it
is anticipated will improve local and national practice.
Graph 27: Diversion from prosecution: Female 
Graph 28: Diversion from prosecution: Male 
Policy, development, trauma-informed and commissioning. 
Health and Care (Staffing) (Scotland) Act 2019 Annual report 
The Health and Care (Staffing) (Scotland) Act 2019, commenced on 1st April 2024, aims to ensure
safe and high-quality care by establishing a statutory basis for appropriate staffing levels and
training in health and care services. It introduced duties for local authorities and integration
authorities when planning and securing certain care services. 
We must: 
▪ have regard to the Act and relevant guidance when we plan or secure particular care
services 
▪ ensure that we require service providers to have regard to the Act and relevant guidance 
1 0 0
4
0 1
2
1 0 0
2
1
2
3
2
3 3
1 1 0 0
4 4
0 1
5
0
2
3
2
1
2
1 0 0 0
2
4
0 0
5
0 0 0 0
0
1
2
3
4
5
6
Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25
Diversion from Prosecution: Female
DFP Gender: Female DFP Commencing Gender: Female DFP Completed Gender: Female 2 per. Mov. Avg. (DFP Gender: Female)
12
4
5
8
1
5
6
3
2 1
7
4
1
3
5
7
5
2
4
8
11
4
6
2
8
3
5
1
3
5
2 1 1 2 1
11
4
5
2
5
3
2 0 0 0
0
2
4
6
8
10
12
14
Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25
Diversion from Prosecution: Male
DFP Gender: Male DFP Commencing Gender: Male DFP Completed Gender: Male 2 per. Mov. Avg. (DFP Gender: Male)
Page 75

Page 76

26 | P a g e
▪ make arrangements to monitor service provider compliance 
▪ report annually on the steps we have taken and any ongoing risks that may affect our
ability to comply with Act. 
Following internal and external consultation as well as approval from SMT, the first annual report
has been published online and shared with the Scottish Government. 
Trauma-Informed Practice 
In Moray, as part of the work towards the Scottish Government’s vision of trauma-informed and
response workforce within public bodies, mirrored in the Children’s Services Plan 2023-2026, the
Trauma Informed Development Officer has been leading on the assessment and improvement of
services in terms of the principles of trauma-informed practice.   
As indicated previously, alongside the delivery of these sessions, the Development Officer has
been leading on the establishment of training on trauma-informed practice for staff across Moray
Council and the HSCP. This work has now concluded: the Development Officer, in collaboration
with the Improvement Service, NHS Education for Scotland (NES) and the National Trauma
Transformation Programme (NTTP), has: 
- developed training to meet Level 1 standard
- lead on the incorporation of NES eModules within the CLIVE learning management system 
- created a process for managers and leaders to engage with the Scottish Trauma Informed
Leadership Transformation (STILT) programme. 
The training outlined in the table below is now available to staff. 
Course Level 1
(Informed)
Level 2 (Skilled) Leadership
Development
Staff Wellbeing 
Audience All staff  Staff who may
engage with
people who are
having or had
experiences of
trauma
All staff holding
leadership and
management
roles
All staff
Modules Introduction to
trauma-
informed
principles and
practice
Understanding
the impact of
trauma and
responding in a
trauma-
informed way
Understanding
the impact of
trauma and
responding in a
trauma-
informed way
Psychological
First Aid
Trauma in
children and
young people
Protecting the
psychological
wellbeing of staff
and teams for
managers and
team leaders 
Staff Wellbeing:
taking care of
yourself
Understanding
the of trauma on
mental health
and evidence-
based pathways
to recovery
Scottish Trauma
Informed
Leadership
Transformation
(STILT) webinar
Understanding
the use of
substances to
cope with the
Page 76

Page 77

27 | P a g e
impact of
trauma 
The availability of the training has been advertised to staff within the July/August edition of
Connect. Queries about the applicability of courses and modules as well as expressions of
interest to participate in the STILT programme are to be directed to the Trauma Lead Officer on
TraumaInformedPractice@moray.gov.uk. 
Children’s Social Work Development Plan 
The Children’s Social Work Development Plan has been steadily progressed in this quarter: 
- rolling out of training in relation to chronologies, assessments and sexual harmful
behaviour
- an integrated core assessment has been created and is due to be launched in the next
quarter
- a number of procedures have been developed and are currently awaiting ratification. 
For further details, please see the separate report detailing the Children’s Social Work
Development Plan and its progression provided to the IJB recently. 
Newly Qualified Social Workers Conference 
A group of five local authorities formed the North
Partnership to support newly qualified social
workers in their final year or at the beginning of
their career by facilitating an in-person
conference focusing on the theme: ‘How to
Survive in Social Work’. 
The conference, held on 24th April 2025 in Inverness, has been attended by over 100 delegates,
indicating the appetite for such events. Following the speech of the keynote speaker, Dr Neil
Thompson (author, educator and adviser in social work practice), attendees self-selected 2 of the
5 available workshops. The day, interlaced with opportunities for networking, closed with a
speech from Orkney’s CSWO summarising key messages and highlighting the success of the
event. 
Feedback gathered informally on the day and as part of the formal post-event survey indicated
that the conference provided practitioners with opportunities to discuss, reflect and learn from
each other and fully immerse themselves in the workshops, with precious time out of the office.
The delegates appreciated the workshop content and delivery by staff across the local
authorities, recognising in-house skills and knowledge.   
The North Partnership has reflected on the event, considered the helpful feedback from delegates
and is keen to keep the momentum of this excellent working partnership.  Already, 14
practitioners have expressed an interested in forming a short life working group to discuss next
steps, ensuring we meet the needs and wants moving forward in the context of limited resources.
This may take the form of establishing online peer support forums and themed online learning
sessions providing space for discussion and reflection whilst the evidencing learning and
development of newly qualified social workers. It is also hoped that a similar but smaller-scale
event can take place in time. 
Personal outcomes in performance reporting: test of change 
In line with national direction of travel, Children’s Social Work Service wishes to move towards
the inclusion of personal outcomes and impact within its performance reporting to IJB. Personal Page 77

Page 78

28 | P a g e
outcomes are those that matter to people receiving services; they constitute the impact of
supports provided by the Service. A focus on personal outcomes ensures that the provided care
and support are appropriate and effective at the time when they are needed.  
Following initial scoping and benchmarking, a test of change led by the Policy, Commissioning
and Development Team has been agreed to be taken forward. The exercise will use a simplified
version of the GIRFEC Wellbeing Web to capture the progress of the personal outcomes linked to
the SHANARRI indicators alongside space for recording reflections where impact can be detailed.
The Web will be filled out with ten families receiving various supports from Children’s Social
Work. The Policy, Commissioning and Development Team will guide the lead professionals
throughout the exercise and conduct a focus group session upon conclusion to gather their and
the participating families’ feedback. 
The results of the test of change will be shared with IJB in due course. 
Children and Families and Justice Social Work Commissioning 
The Commissioning team within Children and Families and Justice Social Work leads on eight key
areas of service contracts. The pie chart below indicates the percentage of each area from the
total spend for Q1. 
The individual contracted service areas will be discussed next in turns. 
Family support services 
The family support services area, accounting for 11% of the spend, consists of:
1. the independent advocacy service 
2. three services for prevention and early intervention to avoid family breakdown and
possible out of area care arrangements: 
2.1. Families Together
2.2. Functional Family Therapy 
2.3. Aberlour Youth Point Moray. 
Page 78

Page 79

29 | P a g e
1. Independent advocacy
Moray’s Children’s Right Service, delivered by Quarriers, is available to all young people and their
parents, carers and siblings.  
In this quarter, 186 young people and 164 parents, carers and siblings benefitted from the service. 
This is similar to previous quarters, as shown on the figure below. 
Quarriers support children, young
people and their parents and carers to
have their voice heard in many
situations, including during meetings
with professionals. The graph on the
right shows the number of Social Work,
Education or Health-led meetings that
Quarriers staff attended alongside the
children and adults they advocate for in
this quarter.   
Quarriers are currently operating with a minimal waiting list or pending service list; as at 30th June
2025 there were nine referrals on it. Due to successful recruitment, this issue is hoped to be fully
resolved in Q2. In the meanwhile, new referrals are triaged with a view to prioritise service
provision for looked after children and children in need of protection. 
2. Prevention and early intervention services
The three prevention and early intervention services (Aberlour Youth Point, Families Together and
Functional Family Therapy) supported a total of 112 children and young people and their families
in this quarter. 
Feedback in relation to the individual service providers is discussed below. 
Page 79

Page 80

30 | P a g e
2.1. Aberlour Youth Point Moray
Aberlour Youth Point Moray supports children and young
people who struggle to remain positively engaged within their
home, school or community and who require a targeted
support service.  It also provides support to the parents or
carers of the children and young people with whom they
work. 
Whist the impact of their work is shown by quotations from children and adults, such as the one
above, the progress individuals achieve across the SHANARRI indicators are also recorded.
Specifically, people rate themselves across the SHANNARRI indicators during their initial meeting
and at regular intervals thereafter. 
In this quarter, Aberlour worked with 42 young people and four parents.  Their progress, which is
considered to be the impact of the supports provided, is outlined in the figure below.  It indicates
that the majority of young people’s wellbeing remained the same or improved in this quarter. 
2.2. Families Together 
This service, provided by Children’s First, delivers a
restorative family service in a variety of ways,
including a range of one to one and group sessions,
family focussed money advice service, practical
support (e.g., food parcels and school bank
referrals) and the Family Group Decision Making
approach.
In this quarter, through the financial worker, five
families were able to financially gain £5,672.14. 
Seven families completed their support with Children First during this quarter, the impact of the
service is shown in the table below.  The table details the starting score as rated by the family
initially and is compared to the family’s finishing score.
Family Area of work Start score End score +/-
Difference
1 Safe 1 4 +3
“I’ve been getting on better
with my parent since
working with you” Young
Person 23/04/2025
“Many thanks for all your hard
work in supporting my family, it
has been greatly appreciated” 
Parent, 25/04/25
Page 80

Page 81

31 | P a g e
Relationships 1 5 +4
Voice 1 4 +3
2 Safe  1 3 +2
Relationships 1 3 +2
Voice 1 3 +2
3 Safe 1 4 +3
Relationships 1 4 +3
Voice 1 3 +2
4 Safe 1 4 +3
Relationships 1 3 +2
Voice 1 4 +3
5 Safe 1 3 +2
Relationships 1 3 +2
Voice 1 3 +2
6 Safe 1 3 +2
Relationships 1 3 +2
Voice 1 3 +2
7 Safe 1 3 +2
Relationships 1 3 +2
Voice 1 3 +2 
2.3. Functional Family Therapy 
Functional Family Therapy is a short term, strengths
and family-based therapy programme designed to
help families improve communication and
relationships with a view to keep them together. 
Currently, 15 families are supported by this service. 
The quotation on the left demonstrates the changes
one family faced in the service.
Two families completed their intervention, the bar chart below shows the outcome measures as
rated by the start and end scores by the young people, parents and therapist. The scores are rated
on a five-point scale across six key areas, with a score of three recorded as a significant clinical
outcome. This quarter the young people’s scores are higher in many areas, which identifies the
impact the service has had on them specifically. 
“Things are more nice, easier to
talk to one another than before”
Young Person 09/06/2025
Page 81

Page 82

32 | P a g e
Support for Unpaid Carers
This service, delivered by Quarriers, accounting for 4%
of the total spend in Q4 and is inclusive of the provision
of our statutory requirements under The Carers
(Scotland) Act 2016.
In Q1, 1219 adult and 209 young carers (the highest this
has ever been) benefited from this service with positive
feedback, as exemplified by the quote to the right. 
As of 7 July 2025, the responsibility for the completion of Adult Carer Support Plans and Young
Carer Statements changed from Quarriers to Health and Social Care Moray.  This allows Quarriers
to concentrate solely on the actions of the Unpaid Carers Strategy. 
Out of area care provision 
Accounting 55% of the total spend, out of area care is provided to: 
✓ 19 young people in residential care (53% of spend)
✓ Seven young people in foster and continuing foster care (2% of spend). 
This is an increase of three young people compared to 2024/2025 Q4. 
Local Residential Care 
Accounting for 14% of the spend, residential care is provided to eight young people by Action for
Children across two homes in Moray. This is a static number, as eight beds are commissioned
through this contract. 
Children with a Disability – Residential services 
The Scotia residential service, accounting for 11% of the spend in this quarter, is delivered by
Aberlour Childcare Trust in Alba Place, Elgin. Currently, three young people benefit from this
service. 
Monitoring arrangements indicate that these
children are fully supported, maintaining
relationships with family and friends, and enjoy a
wide range of inclusive community activities. 
The quote from a parent on the right exemplifies the
positive impact of the service and their commitment
to maintaining relationships with the wider family
and friends. 
“I feel comfortable talking
to you about my caring
role”
Young Carer, 21/04/2025
“The staff threw a birthday
party for my son and invited
close family and friends.  They
went above and beyond, and
we had the best time”
Parent, 23/06/2025
Page 82

Page 83

33 | P a g e
Children with a disability- support 
Commissioned services supporting children and young people with disabilities account for 5% of
the total spend and consist of a short break and group activities
services. 
Short Breaks Services
This contract provides day care and overnight short breaks for 12
young people.  They deliver 15-day care and (on average) 21
overnight sessions per month. This allows a break for the
family, the benefits of which is deemed positive, as
demonstrated by the quote on the right.
Group Activities
This is a new service that was co-commissioned with children, young people and their families,
which was launched towards the end of the previous reporting period. 
In this quarter, 40 sessions were delivered, six at
Easter, one May Day, 22 after school and eleven at
weekends.  There were 80 hours of service delivery run
at two locations in Moray. The quotation on the left was
received from a young person who accessed the
service over Easter.  This shows how positive the
sessions were received. 
The number of sessions is expected to increase as referrals from other localities are received by
the service. 
Contextual or place-based safeguarding 
In Moray, similar to other areas in Scotland, an increasing number of young people appear to be
at risk of or posing harm in the community. Contextual safeguarding is a novel approach to
understanding and responding to children's experiences of significant harm beyond their family
and home; it offers a way to understand these risks, engage with children and young people and
help to keep them safe. 
As it was previously reported, initial efforts are focussed on awareness raising and the
development of a framework enabling partner agencies to share information about, understand
and respond to contextual risk around places or groups of children who may or may not be
supported by services on an individual basis. These efforts have continued in this quarter. 
In addition to this, an intervention was led by the Locality Lead Officer in Buckie, who, as part of
the multiagency working group, initiated a community-led discussion to address risks reported
by parents concerning a group of S1/S2 pupils. The risks related to illicit vape use,
experimentation with alcohol and illicit substances, and the challenging of parental boundaries. 
This discussion involved, community policing, youth work, third sector organisations (such as
AYP and Exchange Counselling), a wellbeing coordinator and the children’s named persons. The
discussion focussed on information sharing about available supports and solutions. 
The outcome of this discussion led to the development of a comprehensive support package
aimed at assisting parents, identifying risk areas within the community, and offering direct group-
“Lovely to see my
daughter so happy
when I pick her up, so
I know she’s had a
nice time” 
Parent, 22/06/2025
“Can I come back?  When
is the next session?”
Young Person following
Easter session
Page 83

Page 84

34 | P a g e
based and individual interventions for the young people involved. Named persons communicated
this to the parents and, to capture this positive practice, the Locality Lead Officer will collaborate
with the Working Group on 15 July 2025 to create a guidance flowchart to promote consistent
practice.  
Preparing for the Children (Care and Justice) (Scotland) Act 2024 
The Children (Care and Justice) (Scotland) Act, designed to create a more child-centred and
supportive environment for children within both the care and justice systems in Scotland,
received Royal Assent in 2024. Parts of the Act are already active, and work is being undertaken
nationally for staged implementation between March 2026 and early 2027. 
To begin readying the Service for the Act, the Policy Team attained legal advice and thereafter (at
the end of 2024) briefed the CSWO the changes it will likely introduce. The CSWO requested a
round table discussion with Social Work staff across various levels, to discuss the potential
implications with a view to make recommendations. This event was held in May 2025 and led by
colleagues from Children and Young People’s Centre for Justice. 
The interactive event, outlining the key provisions of the Act with management input around
potential local implications, was generally positively received by attendees. Through discussion,
the attending practitioners generated a range of ideas about actions that can be taken in
preparation for the enactment of the Act. These ideas have been written up in a report for the
CSWO for consideration. 
Training and development: AIMS / Safer Futures 
Feedback from the workforce during the Development Days held in November 2024 indicated a
need for methods to assess and respond to cases where sexually harmful behaviours feature.
Specific funding was secured in quarter 4 to purchase two days of training and two days of AIMS/
Safer Future awareness raising. AIMS is an assessment framework that evaluates sexual
behaviour, non-sexual behaviour, development, environmental/family factors, and self-
regulation. 
Feedback gathered from these sessions has been positive indicating motivation from the
workforce to roll out this as an available assessment tool amongst Social Work led assessments
of need. Reflecting on the feedback, the Policy Team is 
- collaborating with the provider and benchmark other local authorities’ approach to
embed the framework into existing pathways of support to children and families
- considering the securing additional funding to purchase tools specific to the framework. 
Page 84

Page 85

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE AND
RISK COMMITTEE ON 29 OCTOBER 2025 
SUBJECT: INTERNAL AUDIT SECTION - UPDATE REPORT 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 This report provides Committee with an update on the work of the Internal Audit
Section. 
2. RECOMMENDATION 
2.1 Committee is asked to consider the contents of the report, seek clarification
on any points noted and otherwise note this audit update. 
3.  BACKGROUND 
3.1 Global Internal Audit Standards (GIAS) require the Chief Internal Auditor to
prepare and present reports to committee on internal audit’s activity relative to
the audit plan and on any other relevant matters. 
4.  KEY MATTERS RELEVANT TO RECOMMENDATION 
Audit Plan 2025/26
4.1 The Audit Plan for 2025/26 details an intended review of “Support for Carers”.
The broad scope was to examine the processes involved in providing
information, advice and support to unpaid carers, including short breaks and
respite support. However,  I noted that at this Committee on 27 March 2025
(para 7 of the minute refers), a report from the Service Manager Provider
Services, titled “Update on the Delivery of the Unpaid Carers Strategy”, was
presented to “inform Committee of the progress made towards achieving the
objectives outlined in the Unpaid Carers Strategy”.   Further to discussions with
members and officers, I have decided that to allow sufficient time for the full
implementation of the Unpaid Carers Strategy, it would be more beneficial and a
better use of audit resources to defer the planned review of “Support for Carers”
and include it in a future audit plan. In its place, I intend to undertake an audit
Item 7.
Page 85

Page 86

using a data analysis software package to review non-payroll expenditure. This
will focus on assessing compliance with procurement and payment processing
regulations. 
Audit Plan 2026/27 
4.2  Preparation has begun to agree on the Audit Plan for 2026/27. Internal Audit’s
approach to annual audit planning is risk based, with all areas that may be
subject to audit review contained within an ‘audit universe.’ The audit universe
is reviewed and updated on an ongoing basis to include all significant activities
and systems. 
4.3 The consultation process will also provide an opportunity to remind officers of
the established timescales for responding to information requests during an
audit review, as well as to the recommendations within the audit report.
However, Internal Audit recognises the significant workload demands on
officers and will always try to accommodate any requests for changes in
reporting arrangements. 
NHS Grampian Internal Audit Reports 
4.4 As the Chief Internal Auditor of the Moray Integration Joint Board (MIJB), my role
involves providing assurance on the internal controls of systems and practices
required by the MIJB to deliver services, regardless of whether they use Council
or NHS systems. I can provide members of this Committee with audit reports of
reviews undertaken regarding operating practices that use Moray Council
owned systems due to my role as the Council’s Auditor. I am pleased to report
that I have recently signed an agreement with the Internal Audit Provider of NHS
Grampian, which will enable me to report on audit reviews included in their
2025/26 audit plan for NHS Grampian systems and practices to this
Committee.     
4.5 Internal Audit Staffing
The Public Sector Internal Audit Standards (PSIAS), now updated to the Global
Internal Audit Standards, require the Chief Internal Auditor to update this
Committee on any concerns regarding the level of audit staffing resources within
the Internal Audit Section. I have previously raised concerns about whether
current staffing levels are sufficient to meet future auditing needs. I am pleased
to report the successful appointment of a part-time temporary auditor, which
should help meet the increasing demands on the service, although a period of
training will be necessary. This temporary post has been primarily funded from
the remaining budget following the Council’s decision to reduce the vacant
Corporate Investigation Officer position by 0.5 full-time equivalent. The counter
fraud responsibilities of that post will be absorbed into the duties of other
officers within the Internal Audit section. Despite the overall reduction in staffing
resources, this new appointment is expected to strengthen the delivery of the
Annual Audit Plan. 
Follow Up Reviews 
4.6 Internal audit reports are regularly presented to members, detailing not only
findings but also management's responses to the recommendations with agreed
dates of implementation. Internal Audit will also undertake follow up reviews to
Page 86

Page 87

evidence the effective implementation of these recommendations. Please see
detailed the following completed follow up reviews: 
Data Protection
4.7       A follow up review was undertaken to evidence the implementation of
recommendations from an audit that assessed the Council’s compliance with
the Data Protection Act 2018. The audit was originally reported to this Committee
on 30 March 2023 (para 9 of the minute refers). It included several
recommendations for reviewing and updating policies and guidance, as well as
introducing further scrutiny and controls over information management
arrangements. The Information Management Service advised that a multi-year
timescale was required for implementing some of these recommendations due
to the lack of staff resources to meet the ongoing volume of work and other
information management compliance requirements, which were significantly
greater than initially envisaged.  However, for two of these recommendations
concerning the need to update the Council’s Data Protection Policy and
Guidance, as well as to review the guidance documents and forms within the
Information Management section of the Interchange, the service agreed to a
revised completion date of 31 March 2025. Unfortunately, it was found at the
time of this follow-up review that these two recommendations are still to be
completed, with the Service providing a revised implementation date of 31
December 2025. 
4.8      Effective information governance and data protection arrangements are essential,
as failures may lead to breaches of individuals’ personal data. I do not propose to
undertake another follow-up review at this stage; however, I will include another
audit of compliance with the Data Protection Legislation in a future Audit Annual
Plan. The Service has also confirmed its intention to progress with the
implementation of the outstanding recommendations set out in the audit report. 
4.9      Emergency Planning 
This follow-up review assessed the implementation of recommendations from
an audit of the Council's and Health and Emergency Planning arrangements. The
Civil Contingencies Act 2004 places a legal obligation on emergency services
and public organisations to assess risks, plan for, and conduct exercises related
to emergencies such as floods, adverse weather, pandemics, or other incidents
that could significantly impact the community. The follow-up review found that
the majority of recommendations have been implemented, although some
remain outstanding. The Follow-Up Report reviewing the implementation of the
agreed recommendations is provided in Appendix 1. 
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Moray Partners
in Care 2022-2032” 
Internal audit work supports good governance and assists in securing
appropriate  systems of internal control. 
(b)  Policy and Legal
Page 87

Page 88

The internal audit service is provided in terms of paragraph 7:1 of the Local
Authority Accounts (Scotland) Regulations 2014, and there is a requirement
to provide a service in accordance with published Public Sector Internal
Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications
Audit reports highlight risk implications and contain recommendations for
management to address as a means of mitigating.   
(e) Staffing Implications
No implications directly arising from this report 
(f)    Property
No implications. 
(g)   Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions 
None arising directly from this report. 
(j)    Consultations
There have been no direct consultations during the preparation of this       
report.     
6. CONCLUSION 
6.1 This report provides committee with an update on internal audit work
progressed in the latest review period. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/
Page 88

Page 89

APPENDIX 1
Moray Council
Internal Audit Section 
DEPARTMENT: Economy, Environment & Finance
SUBJECT:  Emergency Planning
REPORT REF: 23'021 
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.1 The Emergency Planning Policy and
Procedures should be updated to
reflect current operating
arrangements and staffing structures.
Medium Yes 31/05/2023
(Revised
Implementation
Date
30/11/2025)
Part Implemented –    An updated Emergency
Planning Policy & Procedures has been
prepared in draft, which is now referenced as a
General Emergency Plan. The Plan needs to be
reviewed by the Corporate Leadership Team
before seeking approval from committee. A
revised implementation date of 30/11/2025 has
been agreed. 
5.2 Regular meetings should be held
between the Emergency Planning
Medium   Yes Implemented Implemented– The follow up review has
confirmed that regular meetings are held
Page 89

Page 90

Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Officer and the Business Continuity
and Risk Management Officer to
ensure ongoing alignment of
emergency and business continuity
plans.
between the Emergency Planning Officer and
the Business Continuity and Risk Management
Officer. 
5.3 Emergency plans should be updated
to reflect current risks, working
practices and staffing structures of the
Council and partner organisations. 
After updating the emergency plans,
testing should be undertaken to
evidence their effectiveness and
highlight any areas for further
improvement. 
Medium 
Medium
Yes 
Yes
31/12/2024
(Revised
Implementation
Date
30/09/2025) 
Implemented 
Part Implemented –  A review of emergency
plans for services noted that all have been
updated, except the Health and Social Care
Moray - Care for People Plan. This plan still
requires further review by senior management
before it is finalised.  The Service has provided a
revised implementation date of 30/09/2025. 
It was noted that the Emergency Planning
Officer is undertaking ongoing testing to
evaluate the effectiveness of the emergency
plans and identify areas where further
improvements are required. 
Page 90

Page 91

Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.4 Further training and documented
guidance should be provided to 
Moray Emergency Response Co-
Ordinators (MERC) to support officers
in best practices to follow in the event
of an emergency incident. 
Medium Yes 31/12/2023 Implemented–  It was noted that further
training has been provided to Moray Emergency
Response Co-Ordinators (MERC) by the
Emergency Planning Officer. In addition,
guidance has been developed for officers to
assist in the event of an emergency and is
available to officers through the MERC Portal
within SharePoint. 
5.5 Emergency contact details of the
Moray Emergency Response Co-
Ordinators (MERC) saved within
Sharepoint should be restricted to
only officers that require access to this
information. 
Medium Yes 31/07/2023 Implemented- Access privileges to the
emergency contact details of Moray Emergency
Response Co-Ordinators  (MERC) held within
SharePoint are now restricted to only
authorised officers. 
5.6 An Annual Report should be provided
to elected members detailing the work
undertaken and planned within
emergency planning. 
Medium Yes 31/03/2024
(Revised
Implementation
Outstanding –  Discussions with officers noted
that an annual report detailing the work
undertaken and planned within the Emergency
Planning Service is intended and will thereafter
Page 91

Page 92

Moray Council
Internal Audit Section 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Date
30/11/2025) 
be reported to committee. The Service has
detailed a revised implementation date of
30/11/2025. 
5.7 A review of the hyperlinks contained
within emergency planning webpages
should be undertaken to ensure they
connect to the intended document or
website. 
Medium Yes 30/08/2023  Implemented – The Emergency Planning
Service webpage within the Moray Council
website has been updated and also includes the
correct web links to partner agency websites
and key documents. 
Page 92

Page 93

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE AND
RISK COMMITTEE ON 29 OCTOBER 2025 
SUBJECT: INTERNAL AUDIT SECTION COMPLETED PROJECTS REPORT 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 To provide an update on audit work completed since the last meeting of the
Committee.   
2. RECOMMENDATION 
2.1 Committee is asked to consider and note this audit update. 
3.  BACKGROUND   
3.1 Global Internal Audit Standards (GIAS) require the Chief Internal Auditor to
prepare and present reports to the committee on internal audit’s activity relative
to the audit plan and any other relevant matters. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1      In line with the approved internal audit plan, the following reviews were
completed:   
Banking and Reconciliation
4.2 An audit has been undertaken into the Council’s banking and reconciliation
arrangements. Each year, the Council receives significant funds through its bank
accounts. The Council operates three main bank accounts to manage incoming
funds, all of which were reviewed as part of this audit. The audit objective was to
ensure that effective and systematic processes are in place for the timely and
accurate reconciliation of these accounts. This involved a review of operating
procedures, verification and testing of completed reconciliations and an
assessment of how suspense transactions are administered when income
cannot be immediately identified. Overall, the audit found that the Council has
effective banking and reconciliation arrangements in place. However, some
Item 8.
Page 93

Page 94

administrative improvements were identified. The findings and
recommendations are detailed in the audit report in Appendix 1. 
Residential Care    
4.3 An audit review of residential care was undertaken. The scope of the audit
was to examine the processes for making accurate payments at agreed
contract rates to third-party providers for the delivery of permanent
residential care for older persons. Testing included verifying that all
residents entering a residential care home following a care needs
assessment had been financially assessed in accordance with Scottish
Government Guidance. A check was also carried out to verify the accuracy
of the calculation of assessed contributions toward care costs, as well as
the administrative arrangements for processing and paying third-party care
providers. 
4.4      The audit found that processes and information storage systems within the
Community Care Finance Service to administer payments to residential
care homes are significantly paper-based. The Service should explore
opportunities to digitise its current operating arrangements, which could
lead to improved efficiency and stronger administrative controls. The audit
also identified significant delays in both requesting the necessary financial
assessment information and processing it once received from individuals
who have entered a care home. These delays affect cash flow and
accounting processes, as payments already made need to be recovered
from future payments to care homes. The findings and recommendations
are detailed in the audit report in Appendix 2. 
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Moray Partners
in Care 2022-2032” 
Internal audit work supports good governance and assists in securing
appropriate  systems of internal control. 
(b)  Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the Local
Authority Accounts (Scotland) Regulations 2014, and there is a requirement
to provide a service in accordance with published Public Sector Internal
Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications and Mitigation
Audit reports highlight risk implications and contain recommendations for
management to address as a means of mitigating.   
(e) Staffing Implications
No implications directly arising from this report
Page 94

Page 95

(f)    Property
No implications. 
(g)   Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions 
None arising directly from this report. 
(j) Consultations
There have been no direct consultations during the preparation of this report. 
6. CONCLUSION 
6.1 This report provides Committee with a summary of findings arising from
audit project completed during the review period. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor 
Background Papers: Internal Audit Files
Ref:     
Page 95

Page 96

Appendix 1 
1
Final Internal Audit Report 
Banking and Reconciliation 
July 2025 
Distribution: Head of Financial Services 
Finance Manager 
Assistant Manager – FMS & Banking    
The Internal Audit Section provides Management with an opinion on the internal control environment
and also categories risk ratings for recommendations as high, medium or low (detailed explanation
provided in Appendix1). The audit recommendations for this review have been classified as follows 
Assurance Level Risk Ratings for
Recommendations
Full
Priority 1 0
Priority 2 0
Priority 3 2 
Confidentiality and Disclosure Clause 
This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only
those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information
provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings
on the information and documentation provided and consequently, no complete guarantee can be given that this Report is
necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required. 
This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian
Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party
who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation,
amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract,
reinterpretation, amendment and/or modification by any third party is entirely at their own risk. 
Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities,
limitations and confidentiality.  
Page 96

Page 97

Appendix 1 
2
Contents 
Page
Banking and Reconciliation 
1. Introduction & Scope 3
2. Key Issues  3-4 
Detailed Report 
3. Findings/Recommendations 5-8
4. Management Response 6-9 
Appendices 
1. Audit Terms of Reference and Definitions 
2. Statement of Responsibility 
Page 97

Page 98

Appendix 1 
3
1. Introduction and Audit Scope 
The 2025/2026 annual audit plan provides for a review to be undertaken of the
Council's banking and reconciliation arrangements. Bank reconciliation is the
process of matching the balances in an organisation's accounting records to the
corresponding information on a bank statement. The aim of a bank reconciliation
process is to ascertain the differences between the two and make appropriate
adjustments to the accounting records to ensure accurate reflection of
transactions and balances. 
The audit scope was to obtain assurance that an effective and systematic
methodology is in place to ensure accurate and timely reconciliations are
undertaken of the Council's main bank accounts for the receipt of income. This
involved a review of the operating procedures, verification and testing of the
reconciliations undertaken and the administration of suspense transactions where
income has not been immediately identifiable on receipt. The audit has also
involved undertaking a review of the Council's banking arrangements.   
The Council operates three main bank accounts for administering income
received and these have been reviewed during the course of the audit. Focus has
also been given to the processes for Funds In Transit collections to ensure that
all monies received are identified and remain accounted for at all stages between
collection and lodgement into the Council's bank accounts. The Council collects
a significant and diverse range of income categories, such as Council Tax and
Non-Domestic Rates, Housing Rents, Planning Fees, charges for Waste
Services, and also encompasses funding of the Council through grant receipts
and revenue support.   
The audit has involved interrogation of the Council's Financial Management
System used for accounting and bank reconciliation purposes and the Capita
Income Management System used to provide logs and breakdowns of income
received by services.  
The audit was carried out in accordance with Public Sector Internal Audit
Standards (PSIAS). 
2. Key Issues 
• The audit confirmed that monthly bank reconciliation exercises are
undertaken for all Council bank accounts. However, it was noted that the
certification by management of these monthly reconciliations is not
retained beyond 28 days within the SharePoint Workflow System. The
certification by management of the monthly bank reconciliation
exercises should be retained to ensure evidence of an audit trail is
Page 98

Page 99

Appendix 1 
4
maintained of the scrutiny for a core financial control. 
• Overall, the audit found that within the scope of the review, effective
banking and reconciliation arrangements were in place for all income
received. It should be noted that significant funds are collected annually
through the Council's bank accounts, e.g., in 2024/25, approximately
£225 million in Government funding, £196 million in services fees and
charges and £51 million in Council Tax. However, at the time of the audit,
18 entries, totalling £40,900 of income, were found to have remained
unallocated to accounting codes within the Financial Management
System for over one month, the oldest transaction being 2 months old.
To ensure accounting records are accurate and reflect current
transactions, income received should be allocated to the appropriate
financial code at the earliest opportunity. 
Page 99

Page 100

5 
Findings/Recommendations - Banking and Reconciliation 2025/26 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
1 Low When income is received, a unique reference is
required to identify the source and post it to the
correct customer account, and/or accounting
code within the Financial Management
System's general ledger. However, instances
occur where income received into the Council's
bank accounts either does not have any source
reference, the reference quoted is invalid, or the
income represents a miscellaneous receipt,
such as a payment received that is not
associated with a particular invoice. In these
circumstances, an unreconciled item is created
within the bank reconciliation process, as the
amount will be reflected in the Council's bank
account as received but cannot be
correspondingly recorded within the Council's
financial accounts until a manual identification
is made, which allows posting to the correct
customer account and / or accounting code.
Additionally, identifying breakdowns should be
provided by services for Funds In Transit which
are accounted for at point of collection, before
lodgement into the Council's bank account. The
Unallocated income must be identified in a
timely manner to allow accurate financial
recording within the Council's general
ledger. Services should be reminded of
the need to provide income detail on a
prompt basis. Any receipts not able to be
identified within a reasonable timescale
should be returned to the bank to progress
to a conclusion. 
Page 100

Page 101

6 
non-provision of this information also  creates
an unreconciled item which cannot be recorded
within the Council's financial accounts.   
Overall, from the audit testing undertaken of the
bank account reconciliation processes, effective
management arrangements were found, where
significant funds are identified and reviewed
promptly to ensure that monies received are
accounted for and allocated correctly to the
appropriate accounting code within FMS.
However, at the time of the audit, 18 entries,
totalling £40,900 of income, were found to have
remained unallocated within the FMS for over
one month, the oldest transaction being 2
months old. For accurate and timely recording
of income in the Council's accounting records, it
is important that the source of the monies
received is identified at the earliest opportunity. 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Assistant Manager – FMS
& Banking
Yes 31/08/2025 All income will be allocated within 1 month
of receipt which will allow ample time for
identification. Any income remaining
Page 101

Page 102

7 
unidentified after 1 month will be returned
to the originating source by the Council's
Bank.   
Page 102

Page 103

8 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
2 Low The Council operates three main bank accounts
for the administration of income received and
these have been reviewed as part of this audit.
On a daily basis, reconciling tasks are being
undertaken by the Banking Team within the
bank reconciliation module of FMS to ensure
funds received are appropriately allocated and
accounted for. Every month, a full formal
reconciliation of each bank account is
undertaken and is checked and approved by the
Assistant Manager - FMS & Banking, within the
SharePoint Workflow system. Audit testing
noted that the evidence of authorisation within
the SharePoint Workflow system is deleted after
28 days. An improvement to the process is
required to ensure that evidence of all bank
reconciliation checking and approval by service
management is retained for reference
purposes. 
Monthly bank account reconciliations
should be signed and dated to retain
evidence of the checks and approval
undertaken by management of a core
financial control.   
Page 103

Page 104

9 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Assistant Manager – FMS
& Banking
Yes 31/08/2025 All bank reconciliations will continue to go
through the SharePoint Workflow system.
In addition, the approving manager will add
their signature and date to the file to
preserve the evidence of authorisation
when the file moves to the SharePoint
records site. 
Page 104

Page 105

10 
Appendix 1 
AUDIT TERMS OF REFERENCE AND DEFINITIONS 
1. Audit Objectives 
1.1 The overall audit objective is to provide an objective independent opinion on
the adequacy and effectiveness of controls / processes.  
1.2 The audit will for each controls / process being considered: 
• Walkthrough the processes to consider the key controls; 
• Conduct sample testing of the identified key controls, and 
• Report on these accordingly 
1.3 All audit reviews are carried out in accordance with Public Sector Internal
Audit Standards (PSIAS). 
2. Definitions for Auditing Opinions and Findings 
2.1 In order to assist management in using our reports: 
The Internal Auditor will categorise audit assurance opinion according to
their overall assessment of the risk management system, effectiveness of the
controls in place and the level of compliance with these controls and the action
being taken to remedy significant findings or weaknesses. 
Assurance
Level
System and Testing Conclusion
Full The controls tested are being consistently applied
Substantial There is evidence that the level of non compliance with some of the
controls may put some of the system objectives at risk.
Limited The level of non compliance puts the system objectives at risk.
None Significant non-compliance with basic controls leaves the system
open to error or abuse. 
2.2 Risk ratings for each recommendation is based on the following criteria: 
High Fundamental control weaknesses that require immediate attention by
management to action and mitigate significant exposure to risk
Medium Less critically important controls absent, not being operated as
designed or could be improved
Low Lower level controls absent, not being operated as designed or could
be improved.
Page 105

Page 106

11 
Appendix 2 
STATEMENT OF RESPONSIBILITY   
The responsibility for designing and maintaining a sound system of internal control to
prevent and detect fraud and other irregularities rests with management, with internal
audit providing a service to management to support them to achieve this objective.
The Internal Audit Section will assess the adequacy and effectiveness of the system
of internal control arrangements implemented by management and perform sample
testing on those controls in the period under review with a view to providing an opinion
on the extent to which risks in this area are managed. 
The Internal Audit Section will undertake testing with the objective of detecting
significant control weaknesses. However, the audit approach alone should not be
relied upon to identify all strengths and weaknesses in internal controls nor to find any
fraud or irregularity. Even sound systems of internal control can only provide
reasonable and not absolute assurance and may not be proof against collusive fraud. 
The matters raised in this report are only those that came to our attention during the
course of the audit review and are not necessarily a comprehensive statement of all
the weaknesses that exist or all improvements that might be made. Recommendations
for improvements should be assessed by management for their full impact before they
are implemented. The performance of the audit review undertaken should not be taken
as a substitute for management’s responsibilities for the application of sound
management practices. 
This report must not be disclosed to any third party or reproduced in whole or in part
without the written consent of the Moray Council’s Audit and Risk Manager. 
Page 106

Page 107

Appendix 2 
1
Final Internal Audit Report 
Residential Care 
August 2025 
Distribution: Chief Financial Officer (Moray IJB & Dr Grays) 
Head of Service 
Interim Finance Manager    
The Internal Audit Section provides Management with an opinion on the internal control environment
and also categories risk ratings for recommendations as high, medium or low (detailed explanation
provided in Appendix1). The audit recommendations for this review have been classified as follows 
Assurance Level Risk Ratings for
Recommendations
Substantial
Priority 1 0
Priority 2 4
Priority 3 3 
Confidentiality and Disclosure Clause 
This report (“Report”) was prepared by the Internal Audit Section of Moray Council. The matters raised in this Report are only
those which came to our attention during our internal audit work. Whilst every care has been taken to ensure that the information
provided in this Report is as accurate as possible, the Moray Council Internal Audit Section has only been able to base findings
on the information and documentation provided and consequently, no complete guarantee can be given that this Report is
necessarily a comprehensive statement of all the weaknesses that exist, or of all the improvements that may be required. 
This Report was prepared solely for the use and benefit of the Moray Council, Moray Integration Joint Board or the Grampian
Valuation Joint Board. Moray Council's Internal Audit Section accepts no responsibility and disclaims all liability to any third party
who purports to use or rely for any reason whatsoever on the Report, its contents, conclusions, any extract, reinterpretation,
amendment and/or modification. Accordingly, any reliance placed on the Report, its contents, conclusions, any extract,
reinterpretation, amendment and/or modification by any third party is entirely at their own risk. 
Please refer to the Statement of Responsibility in Appendix 2 of this report for further information about responsibilities,
limitations and confidentiality.     
Page 107

Page 108

Appendix 2 
2
Contents 
Page
Residential Care 
1. Introduction & Scope 3-4
2. Key Issues  4 
Detailed Report 
3. Findings/Recommendations 5-18
4. Management Response 6-19 
Appendices 
1. Audit Terms of Reference and Definitions 
2. Statement of Responsibility 
Page 108

Page 109

Appendix 2 
3
1. Introduction and Audit Scope 
The 2024/25 annual audit plan includes a review of the procedures and
administrative arrangements involving third-party suppliers appointed to provide
residential care home services. Last year's gross expenditure budget for
permanent residential care for older persons was £12.6 million. Monitoring actual
expenditure against this budget is undertaken and reported regularly to the Moray
Integration Joint Board. At the time of this audit review, an overspend of £1.8
million was noted for 2024/25. The Service has indicated this is due to an
increased number of individuals requiring nursing care, which is charged at a
higher rate than residential care. 
A care needs assessment from Health and Social Care Services is required
before an individual enters a care home. This assessment determines the type
and level of care an individual requires, ensuring the home can provide the
necessary support. A financial assessment is then undertaken to evaluate an
individual's income, savings and capital to determine how much they can afford
to contribute towards their care. The review noted that at the time of the audit,
there were 470 supported individuals in permanent residential care. However,
these numbers can vary throughout the year. Funding arrangements are in place
with 52 individual care home, 14 of which are located within Moray and provide
care to 91% of all residents.   
The National Care Home Contract (NCHC) sets the standard rates for residential
and nursing care payable for publicly funded placements in Scotland. For
2024/2025, the standard rate for residential care is £825.94 per week. The
standard rate for nursing care is £957.57 per week, which includes the additional
costs associated with nursing services, ensuring that residents receive the
necessary medical care and support. The amount payable by an individual
entering a care home is determined through a financial assessment and a means-
tested calculation, which will result in a contribution towards the cost of their care.
However, if an individual has capital exceeding £35,000, they are considered a
self-funding resident. In such cases, the contract for their care is arranged directly
between the individual and the care home.    
The audit scope was to review the processes for making accurate payments to
third-party providers for permanent residential care delivery at agreed contract
rates. The audit also involved testing to ensure that all eligible residents are
financially assessed in accordance with the Charging for Residential
Accommodation Guidance (CRAG) issued by Scottish Government and that
assessed contributions towards care costs are appropriately applied.   
The audit focused on permanent residential care for older persons in the care
sector. An audit of social care financial assessments for other care sector groups,
non-residential services and temporary residential care has been included as a
separate audit project within the 2025/26 Internal Audit Plan.   
Page 109

Page 110

Appendix 2 
4
The audit was carried out in accordance with Public Sector Internal Audit
Standards (PSIAS). 
2. Key Issues 
• The audit found that the systems used by the Community Care Finance
Service to administer the residential care home service are significantly
paper-based. Concerns were noted during the review regarding the
storage arrangements of resident files, which were further exacerbated
by home working arrangements. Consideration should be given to
exploring opportunities for digitising processes to improve administrative
efficiency and data protection management. 
• A care needs assessment is required before an individual enters a care
home. When a care home is considered the most appropriate care
option, a financial assessment is then required to determine how much
the individual should contribute towards the cost of their care. Audit
testing identified  significant delays both in requesting the necessary
financial assessment information from individuals and in processing the
information once received. However, no concerns were noted regarding
the accuracy of the financial assessments undertaken. 
• When a new resident enters a care home, standard residential or nursing
care rates are paid for publicly funded placements. These rates apply
until the resident's income, savings and capital are assessed to
determine their financial contribution towards the cost of their care.
However, it was noted that there is no early identification of individuals
who may be "self-funders", A self-funder is someone who pays the full
cost of their care, as they declare that their income, savings or assets
typically exceed the financial threshold and a financial assessment is not
required to be undertaken by Community Care Finance. In such cases,
the amounts overpaid are recovered from the care homes. Early
identification of self-funders would eliminate this requirement  and
improve cash flow and the financial accounting processes. 
Page 110

Page 111

5 
Findings/Recommendations - Residential Care 2024/25 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
1 Low Contributions required from individuals towards
the cost of their residential care are based on
the Charging for Residential Accommodation
Guidance (CRAG), issued annually by the
Scottish Government. This guidance ensures a
nationally consistent approach to the charging
criteria for residents in residential care homes.
However, the audit review found that the
information regarding the financial process for
contributing to the cost of residential care, as
detailed on the Council's website, is dated 2011
and is not the most current version of
information available within the Service. It is
understood that Service is developing guidance
content which will need to be reflected on both
the Moray Council and Health and Social Care
Moray websites.   
Information made available online about
residential care and contribution
implications should be reviewed and
updated to ensure clear guidance is
available to members of the public. 
Page 111

Page 112

6 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Interim Finance Manager Yes 30/09/2025 Moray Council and Health and Social Care
Moray websites will be updated to reflect
CRAG content on an annual basis. 
Page 112

Page 113

7 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
2 Medium A standardised financial assessment form is
used to record the information required under
Charging for Residential Accommodation
Guidance (CRAG) to calculate the contribution
a resident must make toward the cost of their
residential care. At the time of the audit, the
Service was in the process of revising this form.
It was noted that the current financial
assessment form, along with the supporting
information provided in communications with
the resident or their representative, is not
digitised. The process remains manually
intensive in terms of information handling. A
modernised approach to engagement is
required, offering the potential for administrative
savings and improved ease of use for
stakeholders.     
Consideration should be taken to
modernise and improve the financial
assessment process by digitising the
request and submission of assessment
information.   
Page 113

Page 114

8 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Interim Finance Manager Yes 31/03/2027 The current Financial Assessment Form
has been reviewed and updated to
facilitate the easier capture and processing
of information. However, the digitisation of
the process is linked to the implementation
of the replacement of the CareFirst
system. 
Page 114

Page 115

9 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
3 Medium As noted in Finding 2, financial assessments
and their associated supporting information are
not currently available in electronic format. As
part of the audit review, access to residents'
files was required to test and verify the accuracy
of the financial assessments undertaken.
However, it was found that there is no organised
filing system for identifying the records held and
their locations. There is also no dedicated or
organised filing space specifically for
Community Care Finance. Instead, files are
stored securely in a room alongside other social
work files in boxes but not in alphabetical order.
Files actively being worked on by officers may
be located in the Community Care Finance
office or at officer's homes due to homeworking
practices. However, there is no log maintained
of files removed by staff. All files requested for
audit sampling were located, either in the
storage room, Community Care Finance office,
or at officers' homes and were made available
to Internal Audit over a period of time. The lack
of a system for documenting records
held/extracted is not conducive to easy access
A filing system should be implemented to
ensure that all financial assessments and
related records are secure, easily
identifiable, and can be located at all
times. As detailed in Recommendation 2,
further exploration into the digitisation of
the information held should be
undertaken. Additionally, due to
homeworking arrangements and the
storage of files at officers homes, a record
log detailing the location of these files
should also be maintained. All officers
should also be reminded of the importance
of good data protection arrangements in
the storage of information within their own
homes.     
Page 115

Page 116

10 
or the proper control of supported person's
records.    
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Interim Finance Manager Yes 31/08/2025 An online filing system is to be
implemented to eliminate need for manual
storage and handling. The Mailroom
Service has agreed to scan all backlog
records and a new process is in place for
scanning new files. 
Page 116

Page 117

11 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
4 Medium A care needs assessment is required before an
individual enters a care home. This assessment
is usually undertaken by a community care
officer or social worker to determine the level of
care and support needed. If a care home is
considered the most appropriate care option, a
financial assessment is then required to
determine how much an individual should
contribute towards the cost of their care. This
assessment considers income, savings and
capital to decide whether and how much
financial assistance can be provided. The
National Care Home Contract (NCHC) standard
or nursing rate is paid gross to the care home
for a resident until the financial contribution has
been determined. Any subsequent
overpayment, calculated from the financial
assessment, is recovered from future payments
made to the care home. 
The audit undertook a review of the financial
assessment process for individuals entering a
care home. From a random sample of 20 cases,
8 were identified where there were delays by the
Community Care Finance Service, taking
The operational demands within the
Community Care Finance Service are
appreciated. However, as already detailed
within this report, the implementation of
greater digitisation of processes and
storage of information will deliver
improved efficiencies. Consideration
should also be given to reviewing the roles
and responsibilities of officers, which may
also highlight where changes in current
working practices will deliver improved
service performance. 
In addition, the development of
comprehensive performance information
to support improved monitoring of service
delivery should be undertaken. 
Page 117

Page 118

12 
between 5 weeks and 3 months to request
information from a resident to be used in the
financial assessment to determine an
individual's financial contribution towards their
care home costs. As care home rates are paid
gross to the providers until a resident's financial
contribution is determined, this may result in the
need to recover significant sums from future
payments. 
It is appreciated that further delays can occur
due to the time taken for a resident to provide
the information required to undertake a financial
assessment. However, it was noted that
significant delays were still observed in carrying
out financial assessments after the requested
information had been received. The audit
reviewed a sample of 20 financial assessments
and found 7 cases where delays ranging from 4
weeks to 3 months occurred in completing the
evaluation. These duties are undertaken by only
one officer, and at the time of the audit, 363
referrals for financial assessments had been
undertaken in the 11 months of 2024/25. It is
also acknowledged that the complexity and
level of input required can vary significantly
when determining an individual's financial
contribution towards their care home costs. 
Page 118

Page 119

13 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Interim Finance Manager Yes 31/03/2027 The digitisation of the financial
assessment process will be part of the
Carefirst replacement system. In the
interim, the financial assessment process
has been divided into different
administrative roles, and written
procedures have been completed. This
should help improve the flow of information
and reduce timescales for financial
assessment completion. 
Page 119

Page 120

14 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
5 Medium A "self-funder" is someone who pays for their
care home fees from their own resources. This
typically applies when an individual entering a
care home has capital in excess of £35,000 (for
2024/25). The self-funder pays their care fees
directly to the care home, and the Council is
only be liable to pay the free personal care rate
as stipulated by the Scottish Government.
There is no requirement for a full financial
assessment of a self-funder, only a declaration
is required as part of the application for the free
personal care payment. 
As detailed in Finding 4, delays were noted
within the Community Care Finance Service in
undertaking financial assessments to determine
the financial contribution required when an
individual enters a care home. The audit noted
that even for self-funders, payments are being
made to care homes at the gross rate. Once the
financial assessment is completed and the
individual is confirmed as a self-funder, the
overpaid expenditure is recovered from the care
home. 
Consideration should be given to refining
the assessment processes for individuals
entering a care home, to enable the early
identification of potential self-funders and
ensure that appropriate accounting
arrangements are applied from the outset.   
Page 120

Page 121

15 
Management Response
Responsible Officers Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Head of Service / Interim
Finance Manager
Yes 30/09/2025 Discussions have been held with Head of
Service to ensure Social Workers resume
this activity and issue appropriate
documentation to enable self-funder
identification and processing at the earliest
opportunity. 
Page 121

Page 122

16 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
6 Low The scope of this audit included a review to
verify the accuracy of the 4 weekly payments
made to care homes. It was noted that, as part
of the verification process, a paper record is
maintained for each resident in each care
home, detailing the 4 weekly payments to be
made. This record is updated and cross-
checked against information in the social work
and social care case management system
(CareFirst) producing the payment batches, to
confirm accuracy. In addition, the paper record
is used to calculate any payment adjustments
required due to changes in a resident's
circumstances. 
These paper payment records are held
individually by the officers responsible for
specific care homes. As these officers work
from home, the records are not digitised or
centrally stored, which limits accessibility for
other officers in the event of a query or when
further scrutiny is required.     
The payment records maintained for each
resident within a care home should be
digitised to improve accessibility and
ensure they are readily available to
management and other officers within the
service.   
Page 122

Page 123

17 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Interim Finance Manager Yes 31/03/2026 System for moving payment records online
is underway. A care home is being trialled
and there will then be a roll out to the rest
of the care homes. 
Page 123

Page 124

18 
Ref Risk Ratings for
Recommendations
Audit Finding Audit Recommendation
7 Low Payments are made to care home providers on
a four-weekly basis and are accompanied by a
remittance report that provides a breakdown of
the residents at each home. In addition, care
homes are contractually required to notify the
Social Care Service of any changes in
residents' circumstances that may affect
ongoing payments. 
However, it was noted that the Community Care
Finance Service also issues a separate
payment schedule fortnightly to each care
home. The schedule lists the residents and the
rates to be paid to each care home. Care homes
are expected to confirm the accuracy of this
schedule and return the completed form to the
Community Care Finance Service. The audit
found a low return rate of these forms from care
home providers, and non-submissions are not
followed up. Discussions with the Service
indicated that the requirement for this fortnightly
schedule is historical and likely dates back to a
previous payment arrangement with care
homes. 
Consideration should be given to whether
there is an ongoing need to send the
fortnightly estimated payment schedules
to all care homes. 
Page 124

Page 125

19 
Management Response
Responsible Officer Accepted (Yes/ No) Timescale for
Implementation
(Date Required)
Agreed Management
Action/Management Comment
Interim Finance Manager Yes 31/08/2025 Schedules have been confirmed as a
historic practice no longer required given
care home contractual requirements and
resident details provided to homes on
payments made. Practice to be ceased. 
Page 125

Page 126

20 
Appendix 1 
AUDIT TERMS OF REFERENCE AND DEFINITIONS 
1. Audit Objectives 
1.1 The overall audit objective is to provide an objective independent opinion on
the adequacy and effectiveness of controls / processes.  
1.2 The audit will for each controls / process being considered: 
• Walkthrough the processes to consider the key controls; 
• Conduct sample testing of the identified key controls, and 
• Report on these accordingly 
1.3 All audit reviews are carried out in accordance with Public Sector Internal
Audit Standards (PSIAS). 
2. Definitions for Auditing Opinions and Findings 
2.1 In order to assist management in using our reports: 
The Internal Auditor will categorise audit assurance opinion according to
their overall assessment of the risk management system, effectiveness of the
controls in place and the level of compliance with these controls and the action
being taken to remedy significant findings or weaknesses. 
Assurance
Level
System and Testing Conclusion
Full The controls tested are being consistently applied
Substantial There is evidence that the level of non compliance with some of the
controls may put some of the system objectives at risk.
Limited The level of non compliance puts the system objectives at risk.
None Significant non-compliance with basic controls leaves the system
open to error or abuse. 
2.2 Risk ratings for each recommendation is based on the following criteria: 
High Fundamental control weaknesses that require immediate attention by
management to action and mitigate significant exposure to risk
Medium Less critically important controls absent, not being operated as
designed or could be improved
Low Lower level controls absent, not being operated as designed or could
be improved.
Page 126

Page 127

21 
Appendix 2 
STATEMENT OF RESPONSIBILITY   
The responsibility for designing and maintaining a sound system of internal control to
prevent and detect fraud and other irregularities rests with management, with internal
audit providing a service to management to support them to achieve this objective.
The Internal Audit Section will assess the adequacy and effectiveness of the system
of internal control arrangements implemented by management and perform sample
testing on those controls in the period under review with a view to providing an opinion
on the extent to which risks in this area are managed. 
The Internal Audit Section will undertake testing with the objective of detecting
significant control weaknesses. However, the audit approach alone should not be
relied upon to identify all strengths and weaknesses in internal controls nor to find any
fraud or irregularity. Even sound systems of internal control can only provide
reasonable and not absolute assurance and may not be proof against collusive fraud. 
The matters raised in this report are only those that came to our attention during the
course of the audit review and are not necessarily a comprehensive statement of all
the weaknesses that exist or all improvements that might be made. Recommendations
for improvements should be assessed by management for their full impact before they
are implemented. The performance of the audit review undertaken should not be taken
as a substitute for management’s responsibilities for the application of sound
management practices. 
This report must not be disclosed to any third party or reproduced in whole or in part
without the written consent of the Moray Council’s Audit and Risk Manager. 
Page 127

Page 128

Page 128

Page 129

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT PERFORMANCE AND
RISK COMMITTEE ON 29 OCTOBER 2025 
SUBJECT: UPDATE ON THE DELIVERY OF THE UNPAID CARERS STRATEGY 
BY:  SERVICE MANAGER PROVIDER SERVICES 
1. REASON FOR REPORT 
1.1 This report provides an update to Committee on the progress made in
implementing the Moray Carers Strategy, with particular emphasis on key
activities and developments over the reporting period. 
1.2 The purpose of this report is to inform the Committee of the work undertaken to
date in delivering on the objectives outlined within the Strategy and to highlight
ongoing actions and outcomes. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
i) note the progress made to date in delivering the objectives set out in the
Carers Strategy; and 
ii) instruct the Lead Officer for Unpaid Carers to provide quarterly progress
reports to this Committee to support ongoing monitoring and scrutiny of
the strategy implementation. 
3. BACKGROUND 
3.1 Unpaid carers are integral to the delivery of health and social care in Moray,
providing essential support to individuals who are unable to manage without
assistance. It is estimated that around 16,200 individuals in Moray are
undertaking some form of unpaid caring role for a partner, family member, friend,
or neighbour. 
3.2 The local Carers strategy, aligned with the national vision of Valuing, Recognising
and Supporting Carers was launched on 1 April 2023. A two-year extension to the
Item 9.
Page 129

Page 130

current strategy was approved by the Moray Integration Joint Board (MIJB) on 19
June 2025 (para 9 of the minute refers). 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 A significant development has been the change in the service delivery model
following amendments to the contract specification with Quarriers, the
commissioned carers service. Health and Social Care Moray (HSCM) now
undertake the full carer assessments for both adult and young carers. This shift
has enabled Quarriers to focus on early intervention and prevention, moving
beyond the reliance on Adult Carer Support Plans (ACSPs) and Young Carer
Statements (YCSs) as the main identifiers of support need and initiators of
support itself. As a result, carers have reported improved access to support, with
faster response times and a broader range of resources available following initial
contact. Carers have reported feeling more valued and supported in line with our
strategic outcomes as a result. 
4.2 A revised ACSP has been developed, consulted upon, and implemented.
Stakeholder engagement included representatives from HSCM, Quarriers, Social
Work, and unpaid carers. The new format promotes a strength and assets based
approach, facilitating early intervention and self-management through a
conversational and empowering framework. Feedback from carers has been
overwhelmingly positive with many expressing that their voices are being heard
and recognised and feelings of empowerment. 
4.3 Work is now underway to redesign the Young Carer Statement. The redesign of the
YCS will ensure a more person-centred approach, aligned with the ACSP, with a
clear focus on early help, building supportive relationships and recognising
strengths and assets. By placing young carers’ voice at the heart of the process,
the revised statements will support timely intervention, reduce risks of crisis, and
promote wellbeing. To reflect different stages of development, at least two forms
will be developed: one for primary-aged young carers, using accessible language,
and one for secondary-aged young carers, allowing greater depth and future
planning. This will provide a flexible, empowering tool that support young carers’
needs and aspirations. 
4.4 Quarriers have introduced new peer support initiatives, including ‘Own Your
Hours’ sessions in Buckie and Speyside. Based on participation feedback, these
are being replaced by ‘Blether and a Brew’ sessions to be held at different
locations across Moray between October 2025 and March 2026. These informal
drop-in sessions, led by the Family Wellbeing Workers, provide peer support and
core information for carers. The sessions will cover themed topics such as
emergency planning and access to short breaks, and will also aim to engage
specific carer groups, including male carers and carers supporting someone in
residential or nursing care. 
4.5 In collaboration with Age Scotland, Quarriers will deliver two Dementia Awareness
workshops in Buckie and Forres during October. The Forres session will
complement a broader community event focussed on recognising and supporting
carers. Building on positive feedback from previous years, the service has
Page 130

Page 131

scheduled workshops for carers supporting individuals with autism or dementia.
Twenty four carers participated in the Autism Reality Experience in September,
which simulated what it feels like to live with autism. These sessions enhanced
participants’ understanding of how-to better support those they care for in various
situations. A Virtual Dementia Tour is planned for later in the year, offering 24
carers the opportunity to experience the challenges faced by individuals living
with dementia. Further dementia-related training will include:
• Dementia Interpreter Workshop (October):  Focussed on improving
communication skills and confidence when interacting with people who
have dementia
• Dementia DIET Session (November):  Exploring the impact of food
choices, preparation, and presentation on the wellbeing of people with
dementia. 
4.6 Quarriers will deliver a programme of wellbeing workshops for adult carers
between October and March. These sessions will offer carers opportunities to
engage in a range of well-being activities within their local communities. The
programme will be promoted widely through:
• Quarriers’ newsletter and e-news (distributed to both carers and
professionals).
• Direct outreach to carers most likely to benefit, and
• Local advertising ahead of each session. 
4.7 Quarriers facilitated a summer programme of activities for young carers in
partnership with local providers. A highlight was enabling a small group of young
carers to attend the Scottish Young Carers Festival in Dunfermline. 
The summer programme included:
• A visit to the Highland Wildlife Park for very young carers.
• Activity days with Wild Things, including a dedicated session for those
transitioning to secondary school.
• Four outdoor adventure days with Outfit Moray, and
• An art workshop designed to help young carers reflect on how their caring
role impacts their lives. 
4.8 The Service will repeat the successful Hopscotch residential week in November,
offering 12 primary-aged young carers the chance to participate in outdoor
challenges and enjoy time away from their caring responsibilities in a group
setting. In addition, Quarriers will continue working with the Young Carers Strategy
Officer to:
• Expand opportunities for peer support within schools, and
• Develop and deliver skills-based group sessions tailored to young carers’
needs, such as resilience- building and emergency planning. 
4.9 The Carers Team are developing a comprehensive suite of training materials to
raise awareness of the needs and experiences of both adult and young carers.
This will complement the existing TURAS training by providing tailored resources
for health and social care professionals, ensuring they are equipped with the
knowledge and skills to identify carers early, respond appropriately, and provide
support as required. 
Page 131

Page 132

4.10 Quarriers have re-established the Carers Voice Group, with the most recent
session held on 17 September 2025. This group provides a vital forum for ensuring
that lived experience directly shapes local developments, offering a space for
two-way communication between carers and professionals. The group will be
influential in wider service improvements, ensuring that carers’ perspectives
remain central to the design and delivery of support. 
4.11 The Carers Lead remains actively engaged with the national networks to keep
abreast of developments in the Care Reform Bill, with a particular focus on the
proposed legislation strengthening carers’ rights to a break. The Bill places a
greater emphasis on local authorities’ duty to provide meaningful respite,
recognising its importance in supporting carers’ health and wellbeing, and ability
to sustain their role. In line with this Quarriers are leading on the development of a
Short Breaks Bureau supported by the Carers Team and Day Opportunities Team
at HSCM. This work will link in with external funding already accessed by Quarriers
from Shared Care Scotland and the Time to Live grants. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint Board
Strategic Plan “Moray Partners in Care 2022-2032”
Carers who are supported to carry out their role in a way that supports their
own health and wellbeing and their educational and economic potential,
are key to achieving the ambitions of the Moray IJB Strategy Plan, the
Corporate Plan and LOIP. The strategy will support HSCM to demonstrate
impact on Outcome 6 of the National Health and Wellbeing Outcomes. 
Involving unpaid carers, the person they care for, and workers from health
and social care services work together as partners they increase the
chances of better outcomes for all involved, this aligns with Realistic
Medicine, putting people at the centre of decision about care and support,
alongside the key priorities highlighted through the work of Equal Partners
in Care (EPiC). 
(b) Policy and Legal
Having a local carer strategy in place meets the legal obligation on the
Moray IJB as prescribed in the Carers (Scotland) Act 2016. It also supports
carers right to:
• Access a local information and advice service.
• Be included in the hospital discharge of the person they are caring
for.
• Request and Adult Carer Support Plan (if over the age of 18) or a
Young Carer Statement (if under aged 18 or younger)
• Access Support if they have eligible needs.
• Be consulted on services for them and the person they are caring
for. 
(c) Financial implications
Page 132

Page 133

Annual Carer Act funding is in place to support delivery of the strategy. The
actions outlined within the Strategy and Action Plan, including the
commissioning of the local information and advice service, require to be
delivered within the existing resource envelope and through additional,
applied for, funding streams where available. 
(d) Risk Implications and Mitigation
The provisions of the Act are considered to contribute to overall risk
management across the responsibilities of the health and social care
partnership. Demand for support is likely to increase significantly as more
people are identified as carers. A local eligibility criterion is in place to
determine whether a carer should receive formal support.  
(e) Staffing Implications
The strategy will be delivered by the workforce in partnership with unpaid
carers, the public, third and independent sectors, and the wider
community. 
(f) Property
None arising directly from this report. 
(g) Equalities/Socio Economic Impact
Carers are more likely to experience inequality of outcome and more likely
to be in poor health than people who do not undertake a caring role. The
strategy aims to enhance equality of opportunity for all carers. 
(h) Climate Change and Biodiversity Impacts
None arising directly from this report. 
(i) Directions
No Direction required. 
(j) Consultations
Consultations have taken place with Assistant SDS & Carers Officer,
Service Manager Provider Services, Service Manger Quarriers Carer
Support Service, Carers Strategy Oversight Group, Operational
Management Team (OMT). 
6. CONCLUSION 
6.1 The paper outlines key updates in the strategy and highlights the ongoing
work and developments that will contribute to improved support and
recognition for unpaid carers in Moray. 
Author of Report: Michelle Fleming, Self-Directed Support & Unpaid Carers Team
Manager (SDS & Carers Lead Officer) 
Background Papers:  
Page 133

Page 134

Ref: 
Page 134

Page 135

REPORT TO:    AUDIT, PERFORMANCE AND RISK COMMITTEE ON 29 OCTOBER
2025 
SUBJECT: EXTERNAL AUDITORS’ REPORT TO THOSE CHARGED WITH
GOVERNANCE 
BY:  CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1 To request the Moray Integration Joint Board (MIJB) consider the reports to those
charged with governance from the Board’s External Auditor for the year ended 31
March 2025. 
2. RECOMMENDATION 
2.1 It is recommended that the Board considers and notes the reports from the
External Auditor within APPENDICES 1 and 2 and recommends approval to
the MIJB. 
3. BACKGROUND 
3.1 The responsibilities of Audit Scotland as the independent auditor are established
by the Local Government (Scotland) Act 1973, the code of Audit Practice (2021),
which can be found at Code of Audit Practice and supplementary guidance, and
are supported by the auditing profession’s ethical guidance. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The work carried out by Grant Thornton during 2024/25 has produced two reports
that are subject to the consideration of those charged with governance.  The
reports are attached as follows: 
• Independent Auditors Report to those charged with governance
(APPENDIX 1)
• The Annual Audit Report 2024/25 (APPENDIX 2) 
4.2 The audit opinions expressed were all unqualified and are reported within the
‘independent auditors report’ included within APPENDIX 1.
Item 10.
Page 135

Page 136

4.3 The Annual Audit Report included at APPENDIX 2 provides an Action Plan where
recommendations for improvement are made, based on the findings of the
review.  These recommendations have been discussed with management and
corresponding actions have been agreed, together with timescales for
completion. 
4.4 The Annual Audit Report provides a summary of the significant audit risks
identified during planning.  The results and conclusions of this work are noted
within the report. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Partners in
Care 2022 – 2032”
The work of the external auditor and the production of these reports for
those charged with governance have been completed within the specified
timescales agreed. 
(b) Policy and Legal
The Public Bodies (Joint Working ) (Scotland) Act 2014 requires that the
Moray Integration Joint Board (MIJB) is subject to the audit and accounts
provisions of a body under Section 106 of the Local Government (Scotland)
Act 1973. 
(c) Financial implications
There are no direct financial implications arising from this report. 
(d) Risk Implications and Mitigation
The external auditor, Grant Thornton, through the audit process, provides
assurance to the Board that the Annual Accounts for 2024/25 give a true
and fair view of the financial position.  The Annual Audit Report highlights
risks identified during the audit process and recommendations for action
that have been agreed by management. 
(e) Staffing Implications
None arising directly from this report. 
(f) Property
None arising directly from this report 
(g) Equalities/Socio Economic Impact
None arising directly from this report as there has been no resultant policy
change. 
(h) Climate Change and Biodiversity Impacts
There are no direct climate change and biodiversity implications as there
has been no change to policy. 
Page 136

Page 137

(i) Directions 
None arising directly from this report 
(j) Consultations
Consultation has taken place between Grant Thornton and the Chief
Financial Officer of the MIJB in preparation of the Annual Audit Report.  Any
comments received have been considered in writing this report. 
6. CONCLUSION 
6.1 The External Auditor has issued an unqualified opinion for the 2024/25
Annual Accounts.  The Annual Audit Report, Independent Auditors’ Report
and the Letter of Representation present the full findings. 
Author of Report: Deborah O’Shea, Chief Financial Officer
Background Papers:  with author
Ref: 
Page 137

Page 138

APPENDIX 1
Independent auditor’s report to the members of Moray Integration
Joint Board and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
We certify that we have audited the financial statements in the annual accounts
of Moray Integration Joint Board for the year ended 31 March 2025 under Part VII
of the Local Government (Scotland) Act 1973. The financial statements comprise
the Comprehensive Income and Expenditure Statement, Movement in Reserves
Statement, Balance Sheet and notes to the financial statements, including
material accounting policy information. The financial reporting framework that
has been applied in their preparation is applicable law and UK adopted
international accounting standards, as interpreted and adapted by the Code of
Practice on Local Authority Accounting in the United Kingdom 2024/25 (the
2024/25 Code).
In our opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the Board as at 31 March
2025 and of its income and expenditure for the year then ended;
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2024/25 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland Act
2003. 
Basis for opinion
We conducted our audit in accordance with applicable law and International
Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice
approved by the Accounts Commission for Scotland. Our responsibilities under
those standards are further described in the auditor’s responsibilities for the
audit of the financial statements section of our report. We were appointed by the
Accounts Commission on 18 May 2022. Our period of appointment is five years,
covering 2022/23 to 2026/27. We are independent of the Board in accordance
with the ethical requirements that are relevant to our audit of the financial
statements in the UK including the Financial Reporting Council’s Ethical
Standard, and we have fulfilled our other ethical responsibilities in accordance
Page 138

Page 139

APPENDIX 1
with these requirements. Non-audit services prohibited by the Ethical Standard
were not provided to the Board. We believe that the audit evidence we have
obtained is sufficient and appropriate to provide a basis for our opinion.
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of accounting in the
preparation of the financial statements is appropriate.
Based on the work we have performed, we have not identified any material
uncertainties relating to events or conditions that, individually or collectively, may
cast significant doubt on the Board’s ability to continue to adopt the going
concern basis of accounting for a period of at least twelve months from when the
financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the
Board’s current or future financial sustainability. However, we report on the
Board’s arrangements for financial sustainability in a separate Annual Audit
Report available from the Audit Scotland website.
Risks of material misstatement
We report in our Annual Audit Report the most significant assessed risks of
material misstatement that we identified and our judgements thereon.
Responsibilities of the Chief Financial Officer and Moray Integration
Joint Board for the financial statements
As explained more fully in the Statement of Responsibilities, the Chief Financial
Officer is responsible for the preparation of financial statements that give a true
and fair view in accordance with the financial reporting framework, and for such
internal control as the Chief Financial Officer determines is necessary to enable
the preparation of financial statements that are free from material misstatement,
whether due to fraud or error.
In preparing the financial statements, the Chief Financial Officer is responsible
for assessing the Board’s ability to continue as a going concern, disclosing, as
applicable, matters related to going concern and using the going concern basis of
accounting unless there is an intention to discontinue the Board’s operations.
The Moray Integration Joint Board is responsible for overseeing the financial
reporting process.
Page 139

Page 140

APPENDIX 1
Auditor’s responsibilities for the audit of the financial statements
Our objectives are to obtain reasonable assurance about whether the financial
statements as a whole are free from material misstatement, whether due to fraud
or error, and to issue an auditor’s report that includes our opinion. Reasonable
assurance is a high level of assurance, but is not a guarantee that an audit
conducted in accordance with ISAs (UK) will always detect a material
misstatement when it exists. Misstatements can arise from fraud or error and are
considered material if, individually or in the aggregate, they could reasonably be
expected to influence the decisions of users taken on the basis of these financial
statements.
Irregularities, including fraud, are instances of non-compliance with laws and
regulations. We design procedures in line with our responsibilities outlined above
to detect material misstatements in respect of irregularities, including fraud.
Procedures include:
• using our understanding of the local government sector to identify that
the Local Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland Act
2003 are significant in the context of the Board;
• inquiring of the Chief Financial Officer as to other laws or regulations that
may be expected to have a fundamental effect on the operations of the
Board;
• inquiring of the Chief Financial Officer concerning the Board’s policies
and procedures regarding compliance with the applicable legal and
regulatory framework;
• discussions among our audit team on the susceptibility of the financial
statements to material misstatement, including how fraud might occur;
and
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance
with laws and regulations.
The extent to which our procedures are capable of detecting irregularities,
including fraud, is affected by the inherent difficulty in detecting irregularities, the
effectiveness of the Board’s controls, and the nature, timing and extent of the
audit procedures performed.
Page 140

Page 141

APPENDIX 1
Irregularities that result from fraud are inherently more difficult to detect than
irregularities that result from error as fraud may involve collusion, intentional
omissions, misrepresentations, or the override of internal control. The capability
of the audit to detect fraud and other irregularities depends on factors such as the
skilfulness of the perpetrator, the frequency and extent of manipulation, the
degree of collusion involved, the relative size of individual amounts manipulated,
and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial
statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of our
auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts
of the Remuneration Report
We have audited the parts of the Remuneration Report described as audited. In
our opinion, the audited parts of the Remuneration Report have been properly
prepared in accordance with The Local Authority Accounts (Scotland) Regulations
2014.
Other information 
The Chief Financial Officer is responsible for the other information in the annual
accounts. The other information comprises the Management Commentary,
Annual Governance Statement, Statement of Responsibilities and the unaudited
part of the Remuneration Report. 
Our responsibility is to read all the other information and, in doing so, consider
whether the other information is materially inconsistent with the financial
statements or our knowledge obtained in the course of the audit or otherwise
appears to be materially misstated. If we identify such material inconsistencies or
apparent material misstatements, we are required to determine whether this
gives rise to a material misstatement in the financial statements themselves. If,
based on the work we have performed, we conclude that there is a material
misstatement of this other information, we are required to report that fact. We
have nothing to report in this regard.
Our opinion on the financial statements does not cover the other information and
we do not express any form of assurance conclusion thereon except on the
Management Commentary and Annual Governance Statement to the extent
Page 141

Page 142

APPENDIX 1
explicitly stated in the following opinions prescribed by the Accounts
Commission.
Opinions prescribed by the Accounts Commission on the Management
Commentary and Annual Governance Statement
In our opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which we are required to report by exception
We are required by the Accounts Commission to report to you if, in our opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration Report
are not in agreement with the accounting records; or
• we have not received all the information and explanations we require for
our audit. 
We have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to our responsibilities for the annual accounts, our conclusions on the
wider scope responsibilities specified in the Code of Audit Practice, including
those in respect of Best Value, are set out in our Annual Audit Report.
Use of our report
This report is made solely to the parties to whom it is addressed in accordance
with Part VII of the Local Government (Scotland) Act 1973 and for no other
purpose. In accordance with paragraph 108 of the Code of Audit Practice, we do
Page 142

Page 143

APPENDIX 1
not undertake to have responsibilities to members or officers, in their individual
capacities, or to third parties. 
Angela Pieri, (for and on behalf of Grant Thornton UK LLP), 
120 Bothwell Street, Glasgow, G2 7JS 
Date:  
Page 143

Page 144

Moray Integration Joint Board
Annual Audit Report
Financial year ending 31 March 2025
17 October 2025
Prepared for those Charged with Governance and the
Controller of Audit
Page 144

Page 145

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
GUIDANCE NOTES:
Table of contents does not
update automatically
• Please delete or factor in
any instruction slides at
the start of the deck
before pagination
• Please populate the page
numbers manually before
distributing
Table of contents
2
01 Headlines 03
02 Introduction 06
03 Audit of the annual report and accounts 09
04 Wider scope and best value conclusions 22
Appendices
A Audit adjustments 47
B Action plan and recommendations – wider scope 49
C Follow up of prior year audit recommendations 51
D Audit fees, ethics and independence 58
E Client Service Review 60
F Communication of audit matters 61
Tip – Select View/Outline
View, Right click and select
"Collapse" and copy slide
titles then paste into your
table of conents
Don’t forget to change the
footer
The contents of this report relate only to the matters which have come to our
attention, which we believe need to be reported to you as part of our external
audit process. It is not a comprehensive record of all the relevant matters, which
may be subject to change, and in particular we cannot be held responsible to
you for reporting all of the risks which may affect the Council or all weaknesses
in your internal controls. This report has been prepared solely for your benefit
and Audit Scotland (under the Audit Scotland Code of Audit Practice 2021). We
do not accept any responsibility for any loss occasioned to any third part
acting, or refraining from acting on the basis of the content of this report, as this
report was not prepared for, nor intended for, any other purpose.Page 145

Page 146

Headlines01
Page 146

Page 147

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Headlines (1)
Financial statements
Under International Standards of Audit (UK) (ISAs) and Audit Scotland’s Code of
Audit Practice ('the Code'), we are required to report whether, in our opinion:
• the IJB’s financial statements give a true and fair view of the state of affairs of
the IJB as at 31 March 2025 and of the income and expenditure of the
organisation for the year then ended;
• the IJB’s financial statements have been properly prepared in accordance with
UK adopted international accounting standards, as interpreted and adapted
by the 2024/25 Code;
• the IJB’s financial statements have been prepared in accordance with the
requirements of the Local Government (Scotland) Act 1973, The Local Authority
Accounts (Scotland) Regulations 2014, and the Local Government in Scotland
Act 2003; and
• the audited part of the Remuneration Report has been properly prepared in
accordance with The Local Authority Accounts (Scotland) Regulations 2014.
We are required to report whether the information given in the Management
Commentary is consistent with the financial statements and has been prepared
in accordance with statutory guidance issued under the Local Government in
Scotland Act 2003.
We are also required to report on whether the information given in the Annual
Governance Statement is consistent with the financial statements and prepared
in accordance with the Delivering Good Governance in Local government:
Framework (2016).
We have concluded that the Remuneration Report has been prepared in
accordance with requirements.
We have concluded the work on the Governance Statement has been prepared in
accordance with the relevant guidance.
We have concluded that the other information to be published alongside the
financial statements is consistent with our knowledge of the IJB.
Draft financial statements
The draft financial statements were presented for audit by the deadline of 30
June 2025, with the IJB authorising their financial statements on 24 June 2025.
We have been supported by Moray IJB’s officers during the audit process with
effective working relationships and commitment to the audit process.
We have completed our audit work and subject to the satisfactory completion of
outstanding items outlined at page 6, we anticipate issuing an unmodified
opinion on 30 October 2025.
The working papers presented for audit were a good quality, and any
supplementary working papers, sample requests and queries were responded to
effectively.
4
This table summarises the key findings and other matters arising from the external audit of Moray Integration Joint Board (IJB) and the preparation of the
financial statements for the year ended 31 March 2025 for those charged with governance (the Board) and the Controller of Audit.
Page 147

Page 148

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Headlines (2)
Financial statements Wider scope and best value arrangements
Our audit work was substantially completed during
September 2025. Our findings are summarised on
pages 8 to 17. We have identified no adjustments or
unadjusted misstatements to the primary financial
during the course of the audit. Further detail is set out
within Appendix 1 including minor disclosure
adjustments.
We have not identified any financial statements
recommendations for management as a result of our
audit work on the financial statements, and there were
no recommendations for follow up from the previous
audit.
We would like to take this opportunity to record our
appreciation for the assistance provided by the Chief
Financial Officer and other staff in completing the
external audit.
Under the Audit Scotland Code of Audit Practice (‘the Code’), the scope of public audit extends beyond the
audit of the financial statements. The Code requires auditors to consider the IJB’s arrangements in respect
of financial management, financial sustainability, vision leadership and governance and use of resources to
improve outcomes.
In our External Audit Plan for the year ended 31 March 2025, we documented our assessment of the wider
scope risks and planned audit work.  At the planning stage, we identified one risk in respect of financial
sustainability. We outline our work undertaken in response to the arrangements in place and the risks
identified and conclude on the effectiveness and appropriateness of the arrangements in place based on
the work carried out.
There remains a significant risk in respect of financial sustainability given the significant financial
challenges the IJB faces over the longer term. Further details of the work undertaken are outlined on pages
23 to 45.
We have raised two recommendations for management as a result of our audit work on wider scope. These
are set out in Appendix B. 
We have followed up the twelve recommendations raised in our previous audit. Six out of twelve
recommendations have been cleared with one in progress and five still open. The clearance of the remaining
recommendations will be followed up in 2025/26.
This is the fourth year in succession that Internal Audit have provided a limited assurance opinion,
indicating there are weaknesses in the framework of governance, risk management and control. A number
of the recommendations made by internal audit span multiple years and the IJB must ensure that audit
recommendations are actioned in a timely manner.
Due to the level of follow up work and the amount of work required for wider scope, as indicated in our Audit
Plan we have levied £2,500 additional audit fee as noted on page 59.
Integration Joint Board’s have a statutory duty to have arrangements to secure Best Value. The IJB have
arrangements in place to meet the Best Value obligations, however these could be strengthened by
completing an assessment of the arrangements against the Best Value assurance framework, with the
outcome being reported to the Audit, Performance and Risk Committee at the end of each financial year.
5
Page 148

Page 149

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Headlines (3)
Status of Audit Work
Our work is substantially complete, and at this stage there are no matters of which we are aware that would require modification of our audit opinion. subject to
the finalisation of the following outstanding matters :
• finalisation of review of disclosures and accounting policies within the financial statements and annual report
In addition, the usual closing processes at the final stages of the audit process will need to be performed as listed below:
• receipt of management representation letter
• review of the final set of financial statements
• receipt of final signed financial statements
• final sign off by the engagement lead
• receipt of management’s updated going concern and post balance sheet events assessment at the date of sign off.
We would like to take this opportunity to record our appreciation for the assistance provided by the finance team.
6
Page 149

Page 150

Introduction02
Page 150

Page 151

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Introduction
Scope of our audit work
Our work has been undertaken in accordance with International Standards of
Auditing (ISAs) (UK) and the Code.
This report is addressed to the IJB and the Controller of Audit and will be
published on Audit Scotland's website www.audit-scotland.gov.uk in due course.
This report is a summary of our findings from our external audit work for the
financial year at Moray IJB. The scope of our audit was set out in our External
Audit Plan dated 27 March 2025.
The core elements of our audit work in 2024/25 have been:
• An audit of the IJB’s annual report and accounts for the financial year ended
31 March 2025 [findings reported within this report];
• Consideration of the wider dimensions that frame the scope of public audit as
set out in Audit Scotland’s Code of Audit Practice 2021 (‘the Code’) [within this
report];
• Any other work requested by Audit Scotland.
Responsibilities
The IJB has primary responsibility for ensuring the proper financial stewardship
of public funds. This includes preparing annual accounts in accordance with
proper accounting practices. The IJB is also responsible for compliance with
legislation, and establishing arrangements over governance, propriety and
regularity that enable it to successfully deliver its objectives.
Our responsibilities as independent auditors, appointed by the Accounts
Commission, are set out in the Local Government in Scotland Act 1973, the Code
and supplementary guidance, and International Standards on Auditing in the
UK.
The recommendations or risks identified in this report are only those that have
come to our attention during our normal audit work and may not be all that
exist. Communication in this report of matters arising from the audit or of risks or
weaknesses does not absolve officers from their responsibility to address the
issues raised and to maintain an adequate system of control.
Adding value through our audit work
We aim to add value to the IJB throughout our audit work.  We do this through
using our wider public sector knowledge and we invited IJB officers to our annual
local government accounting workshop.
Through our expertise, we provide constructive, forward-looking
recommendations where we identify areas for improvement and encourage good
practice around financial management and financial sustainability, risk
management and performance monitoring.  In so doing, we aim to help the IJB
promote improved standards of governance, better management and decision
making, and more effective use of resources.
8
Page 151

Page 152

Audit of the annual
report and accounts
03
Page 152

Page 153

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Audit of the annual report and accounts
Approach to the audit of financial statements
Key audit matters and significant risks
The following significant risks have been identified:
• Management override of controls (significant risk).
No key audit matters have been identified.
Internal control environment
In accordance with ISA requirements, we have developed an understanding of
the IJB’s control environment. Our audit is not controls based and we have not
placed reliance on controls operating effectively as our audit is substantive in
nature. In accordance with ISAs, over those areas of significant risk of material
misstatement we consider the design of controls in place.
However, we do not place reliance on the design of controls when undertaking
our substantive testing. We identified no material weaknesses or areas of
concern from this work which would have caused us to alter the planned
approach as documented in our plan.
Recap of our audit approach and key changes in our audit strategy
We have not identified any changes in our approach since our Audit Plan was
presented to the Audit, Performance and Risk Committee on 27 March 2025. The
risks identified remain the same.
10
Key audit
matters
Scoping
Materiality
Page 153

Page 154

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Our application of materiality
We apply the concept of materiality both in planning and performing the audit, and in evaluating the effect of identified misstatements on the audit and of
uncorrected misstatements, if any, on the financial statements and in forming the opinion in the auditor’s report. The concept of materiality is fundamental to the
preparation of the financial statements and the audit process and applies not only to the monetary misstatements but also to disclosure requirements and adherence
to acceptable accounting practice and applicable law. 
Our audit approach was set out in our audit plan. 
• We reviewed and updated our assessment of materiality from planning based upon your 2024/25 draft financial statements and concluded that materiality is
£5.278 million (PY £4.056 million), which equates to approximately 2.5% (PY 2%) of 2024/25 gross expenditure.
• Performance materiality was set at £3.943 million (PY £3.042 million) representing 75% of our calculated materiality (PY 75%).
• We report to Officers (Management) any difference identified over £0.263 million representing 5% of our calculated materiality (PY £0.203 million).
• Due to the public interest in senior officer remuneration disclosures, we apply specific audit procedures to this work and set a lower materiality level for this area of
£25,000 (PY £25,000). We design our procedures to detect errors in specific accounts at a lower level of precision which we have determined to be applicable for
senior officer remuneration disclosures. We evaluate errors in the remuneration report for both quantitative and qualitative factors against this lower level of
materiality. We will apply heightened auditor focus on the completeness and clarity of disclosures in this area and will request amendments to be made if any
errors exceed the threshold we have set or would alter the bandings reported for any individual.
There is a change in materiality values since our final audit plan was communicated to you on 27 March 2025 as final gross expenditure for 2024/25 was used as the
basis of the calculation.  The percentage chosen for higher materiality, performance materiality and triviality remains unchanged.
11
Page 154

Page 155

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Detecting irregularities, including fraud
Irregularities, including fraud, are instances of non-compliance with laws and regulations.  We design procedures in line with our responsibilities, to detect material
misstatements in respect of irregularities, including fraud.  Owing to the inherent limitations of an audit, there is an unavoidable risk that material misstatements in
the financial statements may not be detected, even though the audit is properly planned and performed in accordance with the ISAs (UK).
The extent to which our procedures are capable of detecting irregularities, including fraud is detailed below:
• We obtained an understanding of the legal and regulatory frameworks that are applicable to Moray IJB and determined that the most significant which are
directly relevant to specific assertions in the financial statements are those related to the reporting frameworks; International Financial Reporting Standards and
the 2024/25 Local Government Accounting Code of Practice.
• We enquired of Senior Officers and the Chair of the Audit, Performance and Risk Committee, concerning the IJB’s policies and procedures relating to the
identification, evaluation and compliance with laws and regulations; the detection and response to the risks of fraud; and the establishment of internal controls
to mitigate risks related to fraud or non-compliance with laws and regulations.
• We enquired of Senior Officers and the Chair of the Audit, Performance and Risk Committee, whether they were aware of any instances of non-compliance with
laws and regulations or whether they had any knowledge of actual, suspected or alleged fraud.
• We assessed the susceptibility of the IJB’s financial statements to material misstatement, including how fraud might occur, by evaluating officers incentives and
opportunities for manipulation of the financial statements. This included the evaluation of the risk of management override of controls.  We determined that the
principal risks were in relation to journal entries that altered the IJB’s financial performance for the year and potential management bias in determining
accounting estimates. Our audit procedures are documented within our response to the significant risk of management override of controls below.
These audit procedures were designed to provide reasonable assurance that the financial statements were free from fraud or error. However, detecting irregularities
that result from fraud is inherently more difficult than detecting those that result from error, as those irregularities that result from fraud may involve collusion,
deliberate concealment, forgery or intentional misrepresentations. Also, the further removed non-compliance with laws and regulations is from events and
transactions reflected in the financial statements, the less likely we would become aware of it.
The team communications in respect of potential non-compliance with relevant laws and regulations, included the potential for fraud in in certain account balances
and significant accounting estimates.
In assessing the potential risks of material misstatement, we obtained an understanding of:
− Moray IJB’s operations, including the nature of its operating revenue and expenditure and its services and of its objectives and strategies to understand
the classes of transactions, account balances, expected financial statement disclosures and business risks that may result in risks of material
misstatement.
− The IJB’s control environment, including the policies and procedures implemented by the organisation to ensure compliance with the requirements of the
financial reporting framework.
12
Page 155

Page 156

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Overview of audit risks
The table below summarises the key audit matters, significant and other risks discussed in more detail on the subsequent pages.
Significant risks are defined by ISAs (UK) as an identified risk of material misstatement for which the assessment of inherent risk is close to the upper end of the
spectrum due to the degree to which risk factors affect the combination of the likelihood of a misstatement occurring and the magnitude of the potential
misstatement if that misstatement occurs. A significant risk can be a significant risk due to error or due to fraud. For the purposes of the ISAs (UK), the auditor is
concerned with fraud or suspected fraud that causes a material misstatement in the financial statements. Two types of intentional misstatements are relevant to the
auditor – misstatements resulting from fraudulent financial reporting and misstatements resulting from misappropriation of assets.
As part of our consideration of risks relating to fraudulent financial reporting, we consider the potential for override of controls or other inappropriate influence over
the financial reporting process, such as efforts by management to manage income and expenditure in order to influence the IJB’s year-end performance.
13
Risk title Risk level Change in risk
since audit plan Fraud risk Key audit matter Level of judgment or
estimation uncertainty
Testing
approach
Status of
work to
date
Management override of controls Significant ✓  Low Substantive 
Green
↑ Assessed risk increased since Audit Plan
Assessed risk consistent with Audit Plan
↓ Assessed risk decreased since Audit Plan
 Not considered likely to result in material adjustment or change to disclosures within the financial statements
 Potential to result in material adjustment or significant change to disclosures within the financial statements
 Likely to result in material adjustment or significant change to disclosures within the financial statements.
Page 156

Page 157

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters
Responding to significant financial statement risks
Significant risks are defined by ISAs (UK) as risks that, in the judgement of the auditor, require special audit
consideration.  In identifying risks, audit teams consider the nature of the risk, the potential magnitude of
misstatement, and its likelihood. Significant risks are those risks that have a higher risk of material
misstatement. This section provides commentary on the significant audit risks communicated in the External
Audit Plan.
Key audit matters
Key audit matters are those matters that, in our professional judgement, were of most significance in our
audit of the IJB’s financial statements of the current year and include the most significant assessed risks of
material misstatement (whether or not due to fraud) that we identified.
These matters include those that had the greatest effect on:
• the overall audit strategy;
• the allocation of resources in the audit; and
• directing the efforts of the engagement team.
These matters were addressed in the context of our audit of the financial statements as a whole, and in
forming our opinion thereon, and we do not provide a separate opinion on these matters. There were no key
audit matters identified.
Other risks
Other risks are, in the auditor's judgement, those where the risk of material misstatement is lower than that
for a significant risk, but they are nonetheless an area of focus for our audit. There were no other risks
identified as part of our procedures.
14
Description Audit reponse
Disclosures
Key
observations
KAM
Page 157

Page 158

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (2)
15
Significant risks identified in our
Audit Plan
Commentary
Management override of controls
Under ISA (UK) 240 there is a non-
rebuttable presumed risk that the
risk of management override of
controls is present in all entities.
Our risk focuses on the areas of the
financial statements where there is
potential for management to use
their judgement to influence the
financial statements alongside the
potential to override the entity’s
internal controls, related to
individual transactions.
We have therefore identified
management override of controls as
a significant risk of material
misstatement.  This relates to the
elements involving consolidation,
after the information is extracted
from partner ledgers, to produce the
financial statements for Moray IJB.
We have considered the design of controls in place over key accounting estimates and judgements through performance of
walkthrough procedures and planning inquiries with management. In doing this work, we have concluded there are no significant
estimates and judgements within the Annual Report and Accounts. This is appropriately disclosed within the IJB’s accounting
policies and in line with our understanding of an IJB organisation.
Across our public sector clients, we look to understand and test the control environment over journals including target testing
journals on a risk assessment basis to ensure no management override of control that could result in fraud or material error.
Therefore, we have:
• documented our understanding of and evaluated the design effectiveness of management’s key controls over journals within
Moray Council and NHS Grampian;
• considered our journals testing within the NHS and the Council (as the external auditor of both organisations);
• understood how the IJB accounts were produced and whether there is an opportunity or incentive for management to override
controls to show an improved IJB financial performance through financial reporting;
• gained an understanding of the critical judgements applied by management in the preparation of the financial statements and
considered their reasonableness;
• gained an understanding of the key accounting estimates made by management and
• evaluated the rationale for any changes in accounting policies, estimates or significant unusual transactions
Conclusion
Through our audit procedures performed, we found that there was no evidence of management override of controls. We have placed
reliance upon the journals work completed on the Moray Council and NHS Grampian audits where recommendations were made on
each around the journal authorisation process.
As the IJB’s financial statements are prepared by merging the relevant transactions from Moray Council and NHS Grampian, we
have agreed the figures to underlying joint ledger reports to confirm accuracy and completeness.
We did not identify indication of fraud or inappropriate management bias that could result in a material misstatement.Page 158

Page 159

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Significant risks and key audit matters (3)
16
Significant risks identified in our Audit Plan Commentary
The revenue cycle includes fraudulent transactions
As set out in ISA (UK) 240 (Revised May 2021), there is a rebuttable
presumed risk that revenue may be misstated due to the improper
recognition of revenue. This presumption can be rebutted if the auditor
concludes that there is no risk of material misstatement due to fraud
relating to revenue recognition.
(rebutted)
Auditing standards require us to consider the risk of fraud in revenue.  This is considered a
presumed risk in all entities.
Having considered the risk factors set out in ISA 240 and the nature of the revenue streams
at Moray IJB, we have determined that the risk of fraud arising from revenue recognition
can be rebutted as there is deemed to be little incentive to manipulate revenue recognition
and opportunities to manipulate revenue recognition are deemed to be limited.
As part of our work on material transactions and balances, we have agreed revenue
balances to assurance letters provided confirming the balances at NHS and Council level
as well as an assessment of the income recognition accounting policies and relevant
disclosures.
Conclusion
Our work has not identified any issues to raise in relation to revenue recognition.
Risk of fraud in expenditure
As set out in practice note 10 (Revised 2022) ‘The Audit of Public sector
Financial Statements’, issued by the Public Audit Forum, which applies
to all public sector entities, we consider there to be an inherent risk of
fraud in expenditure recognition.
(rebutted)
Having considered the risk factors set out in PN10 and the nature of the expenditure
streams at Moray IJB, we have determined that the risk of fraud arising from expenditure
recognition can be rebutted as opportunities to manipulate expenditure recognition are
deemed to be limited.
As part of our work on expenditure, we have agreed revenue balances to assurance letters
provided confirming the balances at NHS and Council level.  We have also reviewed
expenditure recognition accounting policies and relevant disclosures.
Conclusion
Our work has not identified any issues to raise in relation to expenditure recognition.
Page 159

Page 160

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Financial statements – key judgements and estimates
17
As required in the IJB’s accounting policies, officers outline critical judgements in applying accounting policies and in addition, assumptions about the future and
other sources of estimation uncertainty. In particular, where estimates and judgements are identified, these should be quantified.
This section provides commentary on key estimates and judgments in line with the enhanced requirements for auditors.
Significant judgement or
estimate Summary of management’s approach Audit Comments Assessment
None
The note within the IJB accounting policies (Note 2
Critical Judgements and Estimation Uncertainty)
confirms there are no judgements or estimates within the
IJB accounts.
We have confirmed there are no
significant estimate or judgements
within the IJB annual reports and
accounts.
Not Applicable
Page 160

Page 161

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other key elements of the financial statements
18
There were other key areas of focus during our audit. Whilst not considered a significant risk, these are areas of focus either in accordance with the Audit Scotland
Code of Audit Practice (2021) or ISAs or due to their complexity or importance to the user of the accounts:
Issue Commentary
Matters in relation to
fraud and
irregularity
It is the IJB’s responsibility to establish arrangements to prevent and detect fraud and other irregularity. As auditors, we obtain
reasonable assurance that the financial statements as a whole are free from material misstatement, whether due to fraud or error. We
obtain annual representation from officers and those charged with governance regarding the IJB’s assessment of fraud risk, including
internal controls, and any known or suspected fraud or misstatement. We have also made inquires of internal audit around internal
control, fraud risk and any known or suspected frauds in year. We have not been made aware of any incidents in the period and no
issues in relation to these areas have been identified during the course of our audit procedures that are outside of the usual expected
investigations.
Accounting
practices
We have evaluated the appropriateness of Moray IJB’s accounting policies, accounting estimates and financial statement disclosures.
We have identified disclosure adjustments required to the financial statements which have been detailed in Appendix 1.
Matters in relation to
related parties
We are not aware of any other related parties or related party transactions which have not been disclosed. The principal related
parties are Moray Council and NHS Grampian.
Matters in relation to
laws and regulations
You have not made us aware of any significant incidences of non-compliance with relevant laws and regulations and we have not
identified any incidences from our audit work. We have not identified any cases of money laundering or fraud at the IJB.
Other information We are required to give an opinion on whether the other information published together with the audited financial statements (including
the Annual Report), is materially inconsistent with the financial statements or our knowledge obtained in the audit or otherwise appears
to be materially misstated.
Minor amendments have been made to the Annual Report and we are satisfied that there are no material inconsistencies to report. As
these are minor, they do not warrant separate reporting.
Page 161

Page 162

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other key elements of the financial statements (2)
19
Issue Commentary
Governance
statement
We are required to report on whether the information given in the Annual Governance Statement is consistent with the financial statements
and prepared in accordance with the Delivering Good Governance in Local government: Framework (2016).
No inconsistencies have been identified; we plan to issue an unmodified opinion in this respect. Minor amendments were processed in the
Statement, and these have been noted within Appendix A.
Matters on which we
report by exception
We are required by the Accounts Commission to report to you if, in our opinion:  adequate accounting records have not been kept; or the
financial statements and the audited part of the Remuneration Report are not in agreement with the accounting records; or we have not
received all the information and explanations we require for our audit or there has been a failure to achieve a prescribed financial objective.
We have nothing to report in respect of these matters.
Written
representations
A letter of representation has been requested from the Integration Joint Board as required by auditing standards. We have not requested any
specific representations in this letter.
Going Concern In performing our work on going concern, we have had reference to Statement of Recommended Practice – Practice Note 10: Audit of
financial statements of public sector bodies in the United Kingdom (Revised 2022). The Financial Reporting Council recognises that for
particular sectors, it may be necessary to clarify how auditing standards are applied to an entity in a manner that is relevant and provides
useful information to the users of financial statements in that sector. Practice Note 10 provides that clarification for audits of public sector
bodies.
Practice Note 10 states that if the financial reporting framework provides for the adoption of the going concern basis of accounting on the
basis of the anticipated continuation of the provision of a service in the future, the auditor applies the continued provision of service
approach set out in Practice Note 10. The financial reporting framework adopted by the Integration Joint Board meets this criteria, and so we
have applied the continued provision of service approach.  In accordance with Audit Scotland guidance: Going concern in the public sector,
we have therefore considered management’s (senior officer’s) assessment of the appropriateness of the going concern basis of accounting
and conclude that:
a material uncertainty related to going concern has not been identified
management’s (senior officer’s) use of the going concern basis of accounting in the preparation of the financial statements is appropriate.
Page 162

Page 163

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other responsibilities under the Code (1)
20
Issue Commentary
WGA return For local government audits, we are required to complete Whole of Government Accounts (WGA) work and provide an assurance
statement on the WGA return as mandated by National Audit Office. The IJB will fall under its parents return (Moray Council).We will
complete the relevant specified procedures and prepare and submit a partial assurance statement once we have completed all our work
on Moray Council’s financial statements, and when the final guidance is received.
Health board
consolidation
For health boards, we are required to under the Code of Audit Practice to examine and report on the consolidation schedules. The IJB
expenditure for NHS Grampian was included within the health board consolidation process and this was submitted as part of our work
on NHS Grampian’s financial statements.
Other returns to
Audit Scotland
In accordance with the Audit Scotland Planning Guidance, as appointed auditors we have prepared and submitted Fraud Returns and
Current Issues Returns to Audit Scotland, sector annual reports, shared intelligence on health and social care, sector meetings and
Technical Guidance Notes.  There is nothing we need to bring to your attention in this respect.
Page 163

Page 164

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Other findings – information technology
Assessment
 - Significant deficiencies identified in IT controls relevant to the audit of the financial statements.
 - Non-significant deficiencies identified in IT controls relevant to the audit of the financial statements / significant deficiencies identified with sufficient mitigation of risk.
 - IT controls relevant to the audit of financials statements judged to be effective at the level of testing in scope.
 - Not in scope for testing
21
This section provides an overview of results from our assessment of Information Technology (IT) environment and controls which included identifying risks from the use
of IT related to business process controls relevant to the financial audit. This includes an overall IT General Control (ITGC) rating per IT system and details of the
ratings assigned to individual control areas.
IT application Level of assessment
performed
Overall ITGC
rating
ITGC control area
rating – security
management
ITGC control area
rating – technology
acquisition,
development and
maintenance
ITGC control area
rating – technology
infrastructure
Related significant risks /
other risks
Advance Business
Solutions e5
system – Moray
Council’s general
ledger
ITGC assessment (design and
implementation effectiveness
only)

Green

Green

Green

Green All significant risk areas
eFinancials – NHS
Grampian’s
general ledger
ITGC assessment (design and
implementation effectiveness
only)

Green

Green

Green

Green All significant risk areas
Page 164

Page 165

Wider scope and best value
conclusions
04
Page 165

Page 166

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope conclusions
This section of our report documents our conclusions from audit work on the wider scope areas set out in the Code. We take a risk-based audit approach to wider scope
work. Within our audit plan we identified one significant risk in respect of financial sustainability.
Wider scope
area
Our risk considerations and focus Significant risk
identified - final
stage
Wider scope conclusion
Financial
Management
The arrangements in place at the
IJB to ensure sound financial
management, accountability and
the arrangements to prevent and
detect fraud, error and other
irregularities
No
The IJB did not approve the 2024/25 before the start of the financial year, with the final budget not approved
until 30 May 2024.  Due to costs pressures and the non-delivery of all required savings during 2024/25, both
partner organisations required to provide additional funding contributions to enable the IJB to achieve financial
balance.  An improvement recommendation on year-end reporting of savings has been made at Appendix C.
There is regular reporting of the financial position throughout the financial year.  The IJB approved the 2025/26
budget in March 2025, before the start of the financial year and in line with required timescales.
Financial
Sustainability
The projected financial position of
the IJB in the medium to longer
term and the relevance and
appropriateness of assumptions
applied to financial plans that will
allow the council to effectively
deliver services in the future
Yes
The 2025/26 budget is based on an unprecedented level of savings being delivered during the year. The quarter
monitoring reports indicate the IJB will not deliver all required savings, which may result in partner
organisations providing additional funding should savings not be achieved. Partners have provisions in their
accounts for the risk of the IJB not achieving break even. The IJB has relied on the use of earmarked reserves to
balance the 2025/26 budget. This is not sustainable for future years as reserves balances will diminish. The IJB
are projecting an £18.2 million funding gap to 2029/30 and must ensure that transformation is the key driver for
addressing identified budget gaps over the longer term.
Use of
Resources to
Improve
Outcomes
The effectiveness of the IJB’s
governance arrangements and
the arrangements in place to
deliver the vision, strategy and
priorities set by the council
No
The IJB have governance arrangements in place that are appropriate and operate effectively. The results of
both Moray Council and NHS Grampian internal audit activity is now reported to the Audit, Performance and
Risk Committee. For the fourth year in succession, Internal Audit have provided a limited assurance audit
opinion, which indicates there are weaknesses in the framework of governance, risk management and control.
The IJB should have definitive plans in place to avoid further limited assurance opinions and four years of
limited assurance opinions requires timely, secured and sustained action.
Vision,
Leadership
and
Governance
How the IJB demonstrates
economy, efficiency and
effectiveness through its use of
financial and other resources
No
The IJB have approved the new Strategic Delivery Plan which identifies the programme of transformational and
improvement work required to meet the IJBs strategic objectives.  The IJB have appropriate performance
monitoring and reporting arrangements in place however the format of the Performance Report and content
within should be reviewed to ensure the correct level of detail is included in year end reporting. The IJB’s
performance is showing a general trend of improvement against the national indicators, however a number of
local indicators are below target.
 No risks identified
 Other risks identified.
 Significant risk identified.
23
Page 166

Page 167

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial management
24
Wider scope
area
Wider scope audit response and findings Conclusion
Financial
management
No risk identified
Financial Management Arrangements
The IJB’s financial performance is reported to the Board as an integral part of the budget monitoring process.
Budget monitoring reports are submitted to the IJB Board throughout the year and senior management and
members receive regular and accurate financial information on the IJB’s financial position. All in-year financial
information is reported on a timely basis and there are several supporting appendices to the monitoring
reports.
The outturn to date and projected year-end outturn position, alongside revisions to the budget are clearly
stated in these reports.  Where assumptions are determined unrealistic or changes significantly from budget,
this is captured, and actions will be identified to resolve any adverse variances.
Members are provided with the opportunity to review, challenge and scrutinise the financial performance. The
finance team have access to real time information through the finance ledger systems within Moray Council
and NHS Grampian to provide accurate financial monitoring reports.
The IJB commission services from Moray Council and NHS Grampian. The management of services within each
of these organisations continue to be governed by the existing Standing Financial Instructions, Schedule of
Reserved Decisions, Operational Scheme of Delegation within the partner organisations.  The Financial
Regulations were subject to review during 2025 and approved by the IJB Board on 29 May 2025.
Finance Team
Individuals involved in the preparation and reporting of financial information are qualified and experienced and
held finance positions at the organisation for a number of years. Given the nature of the IJB and how it
operates, the finance team is relatively small, and if staff shortages or sickness arise, the organisation could
face capacity issues.
Our review of financial monitoring
reports during the year did not
identify any significant issues.
We have not identified any issues
regarding the skills and capability
of finance staff within the
organisation. Given the size of the
organisation, should staff
shortages arise, the finance team
may face capacity issues.
We are satisfied that the IJB have
appropriate financial monitoring
arrangements in place. 
Page 167

Page 168

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial management (1)
25
Wider scope
area
Wider scope audit response and findings Conclusion
Financial
management
(continued)
Financial Performance
The IJB has a responsibility under the Public Bodies (Joint Working) (Scotland) Act 2014 to set a budget before 31
March each year. For 2024/25, the IJB presented a “working budget” to the 28 March 2024 Board Meeting. The
initial budget was in deficit of £3.764 million. Following this, the IJB presented its final budget for 2024/25 to the
30 May 2024 Board Meeting. The final Revenue Budget for 2024/25 totalled £200.641 million which included
£14.665 million set aside services. The funding provided totalled £190.998 million and built into the 2024/25
funding assumptions was expected savings of £8.297 million. The IJB predicted an overall budget deficit of £1.346
million, with the intention to fund the deficit from earmarked reserves.
Throughout 2024/25, there were several adjustments to the final 2024/25 Revenue Budget. All budget revisions
were reported to the IJB with detailed reasoning of the changes made.  The final revised budget position for
2023/24 was £211.765 million.
The table below shows the IJB’s outturn position for the year. The IJB had total expenditure of £210.315 million
against a final budget of £211.765 million, resulting in an underspend against budget of £1.450 million. This
position was following both partner bodies providing an additional funding contribution to the IJB. Moray
Council provided £2.061 million whilst NHS Grampian provided £2.196 million.
Note: Strategic Funds relate to additional Scottish Government funding for Integrated Joint Boards. For Moray
IJB, this generally relates to additional funding received via NHS Grampian and Moray Council.
The IJB required additional
funding contributions from
both partners in order to
achieve the year-end outturn
position.
2024/25 Financial Outturn Revised Budget (£m) Actual (£m)
Core Services 181.235 £188.656
Strategic Funds & Other Resources 14.891 6.020
Set Aside 15.639 15.639
Total 211.765 210.315
Page 168

Page 169

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial management (2)
26
Wider scope
area
Wider scope audit response and findings Conclusion
Financial
management
(continued)
Financial Performance (continued)
The main overspends within core services were as follows:
• Learning Disabilities - The service was overspent by £2.27 million due to the additional purchase of care for
people with complex needs.
• Older People Services and Physical & Sensory Disability – The overspend of £2.26 million primarily related to
overspends for home care and permanent care due to the increase in clients receiving nursing care rather
than residential care.
• Primary Care Prescribing - The primary care prescribing budget reported an overspend of £3.19 million,
mainly due to by the impact of short supply causing an increase in costs.
Financial Performance - Savings
To balance the 2024/25 budget, the IJB intended to make savings of £8.297 million in 2024/25, with progress
on the savings plan reported as part of the budget monitoring reports presented to the IJB Board. Each saving is
broken down by project and continues to be reported on a RAG basis. There is no indication in either the budget
or budget monitoring report whether savings are expected to be recurring in nature. Adding this context into
both documents would provide a clear indication as to whether savings are expected to be one off savings or
whether the benefit will continue in future years. See recommendation 1.
Throughout the year, the IJB made it clear they would not achieve all planned savings and where savings were
not fully achieved, it was expected that partner authorities would need to provide additional funding to meet
any in year deficits.
The budget and monitoring
report should make it clear that
savings are either recurring or
non-recurring in nature.
Page 169

Page 170

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial management (3)
27
Wider scope
area
Wider scope audit response and findings Conclusion
Financial
management
(continued)
Financial Performance – Savings (continued)
The year-end outturn report, presented to the IJB Board on 19 June 2025, provides an overview on the savings
delivered during 2024/25:
Of the £4.633 million of savings delivered in year, the IJB expect £3.398 million to be recurring in nature, with
the remaining £1.235 million being non-recurring savings. As outlined previously, this additional context should
be added to both the in-year monitoring report and year-end outturn report.
We noted that whilst the year-end outturn report provides the final high-level savings position, it does not
include the appendix presented as part of the in-year monitoring reports detailing the final delivery position. It
would be good practice to provide this same level of detail as part of the year-end outturn report which allows
a comparison across the full financial year. See recommendation 1.
During 2024/25, the IJB have implemented a Budget Saving Oversight Group. The Chief Officer chairs the
group, and membership is the senior management team plus project management officers to support to the
process. Monthly meetings are held to review progress on the savings programmes, with the focus on the high
risk/high value savings.
The IJB did not deliver all planned
savings in 2024/25 and required
additional funding from partners
to meet the in-year funding
deficit.
Reporting of savings could be
improved by providing a detailed
breakdown of savings delivered
during the year as part of the
year-end outturn report.
Actual (£m)
Savings delivered 2.302
Savings delivered through reduction in overspends 2.331
Savings not delivered 3.664
Page 170

Page 171

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability
28
Potential significant risk identified in audit plan (narrative from
Audit Plan)
Response to potential significant risk
(planned work in Audit Plan)
Conclusion on potential significant risk
The draft Revenue Budget for 2024/25 was £200.641 million, which
included £14.665 million set aside services, representing Moray’s
share of the Large Hospital Services. The total funding provided from
the partner authorities and Scottish Government was £191.088 million,
resulting in a budget gap of £9.553 million. To manage the funding
deficit, the IJB identified efficiency savings totalling £8.297 million,
resulting in a projected budget deficit of £1.346 million. 
The Quarter 2 revenue monitoring report presented to the Board in
November 2024 identified that the IJB are projecting a total
overspend of £5.580 million for 2024/25.  If this deficit cannot be
reduced by year end, partner authorities will require to provide
additional funding contributions to manage the overspend.
The IJB has a Medium-Term Financial Framework 2023/24 - 2027/28
which has not been subject to update since the 2023/24 budget was
agreed and is now considered to be out of date.  The funding deficit
identified in the MTFF shows a budget gap of approximately £26
million from 2025/26 - 2027/28.  The IJB is preparing an updated
Medium Term Financial Framework which will presented to the Board
in March 2025, alongside the 2025/26 budget.
Our audit work included:
• understanding the future financial
forecasts and plans for the IJB for
2025/26 and beyond, including key
assumptions used, scenario planning,
sensitivity analysis, risk analysis and
the extent of any budget pressures any
impact upon reserves
• considered the actions the IJB is taking
to address identified funding gaps and
associated savings plans.
• followed up the prior year
recommendations in respect of the
financial sustainability risk highlighted
last year.
The 2025/26 Revenue Budget is predicated on
delivering savings of £9.467 million. The IJB have
also budgeted to use earmarked reserves to fund
a projected budgeted deficit of £1.000 million in
2025/26.
The IJB are forecasting a budget deficit of
£4.685 million for financial year 2025/26. It is
unlikely that the IJB will deliver all required
savings in 2024/25 and if possible, they should
look for alternative options to help achieve a
balanced budget.
The updated Medium Term Financial Framework
(MTFF) confirms that financial pressures for
2025/26 and beyond are significant, with the
total funding gap for the period currently
projected to be £18.2 million.  The IJB will need to
identify and deliver significant savings and
transformation to reduce funding gaps and
continue to deliver key services and IJB priorities.
The continued reliance on reserves is not
sustainable and although it helps achieve a
balanced budget in 2025/26, the IJB will not
have sufficient available earmarked reserves to
draw upon in order to meet the 2026/27 funding
deficit.
The risk below was included in the Annual Audit Plan. The narrative is the wording from the Audit Plan and identifies the work we would undertake in response to the
risk identified. Pages 29 to 33 details the work undertaken in response to the assessed risk and we have outlined our overall conclusion below.
Page 171

Page 172

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability (1)
29
Wider scope area Wider scope audit response and findings Conclusion
Financial
sustainability
Significant risk:
There is a risk
that
transformation
and savings
plans to address
financial
pressures for
medium to longer
term are not
sufficient to
address future
funding gaps
and increasing
deficits.
Short Term Financial Planning – Budget Setting 2025/26
Moray IJB’s main source of funding comes from the contributions received from the two partner authorities. 
The IJB undertakes an annual budget process which forms part of the wider medium term strategy process.
This includes discussions taking place between management, Moray Council and NHS Grampian regarding
funding requirements.
As outlined, IJB did not present a balanced budget for 2024/25 before the end of March. As a result, we
recommended in our previous audit that the IJB should ensure it presents its final budget, with all agreed
savings, before the start of the financial year. The 2025/26 budget and savings plan was approved by the IJB
Board on 27 March 2025, in line with required timescales.
The final revenue Budget for 2025/26 is £213.843 million which included £15.638 million for set aside services.
The funding provided totalled £212.843 million and built into the 2025/26 funding assumptions is projected
savings of £9.469 million. The IJB expect £8.279 million of these savings to be recurring in nature. Overall, the
IJB predicted an overall budget deficit of £1.000 million, with the intention to fund the deficit from earmarked
reserves.
The IJB agreed the 25/26
budget in line with required
timescales.
The IJB are intending to
utilise £1.000 million of
earmarked reserves balances
to manage the budget
deficit in 2025/26.
2025/26 Budget 2025/26 (£m)
Total Budget 213.843
Total Funding (203.376)
Savings Identified (9.467)
Budget Deficit (1.000)
Page 172

Page 173

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability (2)
30
Wider scope area Wider scope audit response and findings Conclusion
Financial
sustainability
(continued)
Short Term Financial Planning – Budget Setting 2025/26 (continued)
The level of savings the IJB require to produce in year is unprecedented. As outlined, the IJB did not deliver all
planned savings for 2024/25 and were the full £9.467 million of savings not fully achieved during 2025/26, it is
expected that partner authorities will need to provide additional funding to meet any in year deficits. The IJB will
need to closely monitor savings delivery during 2025/26 via the Budget Savings Oversight Group. 
The savings plan for 2025/26 is made up of several wide-ranging savings proposals including reduction in locum
use, reviewing care packages provided to patients, efficiencies in prescribing and reductions in overtime.
2025/26 Revenue Budget Monitoring
The IJB presented Quarter 1 revenue monitoring report to the September 2025 Board Meeting. The report provides
an update on the IJB’s performance against the 2025/26 budget and shows detailed forecast projections for the
remainder of 2025/26. The budget position at the end of June 2025 is an overspend to date on the Core Services
budget of £1.425 million, and an overspend on the Strategic Funds budget of £0.592 million.
Looking ahead, the IJB are forecasting a budget deficit of £4.685 million (2.2% of the IJB budget) for financial
year 2025/26. 
The progress towards the IJB’s savings plans is included as part of the monitoring report and is reported on a RAG
basis. At the end of June 2025, the IJB were predicting:
- Expect to achieve £6.871 million of savings (rated green)
- £2.598 million of savings are at risk of not being achieved (rated amber or red).
The monitoring reports indicate that it is likely the IJB will overspend in 2025/26 and as such, the IJB must ensure
there is close liaison with partner bodies so that they understand the financial implications the projected
overspend will have on their own budgets. The IJB share the financial position with the partners on a regular basis, 
as part of partners meetings held every six weeks.
The IJB will require to
deliver a significant level
of savings in order to
manage the funding gap
in 2025/26.
It is unlikely that the IJB
will deliver all required
savings in 2025/26 and
if possible, they should
look for alternative
options to help achieve a
balanced budget
The IJB must ensure
there is close liaison with
partner bodies so that
they understand the
financial implications
the projected overspend
will have on their own
budgets.
Page 173

Page 174

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability (3)
31
Wider scope
area
Wider scope audit response and findings Conclusion
Financial
sustainability
(continued)
Medium Term Financial Strategy
The updated Medium Term Financial Framework (MTFF) 2025/26 - 2029/30 was approved at the IJB Board
meeting on 27 March 2025. The financial pressures for 2025/26 and beyond are significant, with the total
funding gap for the period currently projected to be £18.2 million.
The summary position (in the table above) highlights that the IJB will need to closely monitor the financial
constraints within which it is operating. Future funding assumes a level of savings will be achieved each year,
together with transformational redesign that the IJB know they need to make in order to provide affordable
sustainable services within the resources available.
The MTFF assumes that the existing financial pressures will be addressed through savings alongside the need
to transform the way services are provided across the system. Risks such as potential reduction in future
funding, pay negotiations, rising inflation, cost of living crises and supply chain pressures are embedded within
the MTFF however, given the economic uncertainty of these factors, this could result in a growth of the
cumulative funding gap.
To achieve financial
sustainability and reduce
reliance on useable reserves to
bridge funding gaps, the IJB will
need to identify and deliver
significant savings and
transformation to reduce funding
gaps and continue to deliver key
services and IJB priorities. There
is a risk that where savings and
transformation plans are not
delivered, in the short to medium
term this could provide financial
sustainability challenges for the
IJB.
2025/26
£m
2026/27
£m
2027/28
£m
2028/29
£m
2029/30
£m
Estimated Budget Requirement 204.375 212.158 215.950 220.268 224.715
Total Funding (203.375) (207.390) (211.525) (215.784) (220.170)
Use of earmarked reserves (1.000)
Budget Surplus/ (Deficit) - (4.768) (4.425) (4.484) (4.545)
Page 174

Page 175

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability (4)
32
Wider scope
area
Wider scope audit response and findings Conclusion
Financial
sustainability
(continued)
Reserves
Reserves are a key performance indicator of monitoring the financial health of a body. At 31 March 2025, the IJB
held £1.450 million of reserves which were fully earmarked. During 2024/25, the IJB utilised £0.536 million of
reserves.
The IJB has budgeted to utilise £1.000 million of general earmarked reserves in 2025/26 to achieve a balanced
budget. This will reduce general earmarked reserves to £0.450 million by 31 March 2025. The use of reserves to
balance the budget should not be relied upon, as this is finite and not a way to create financial sustainability for
the IJB. As mentioned above, the IJB will need to prioritise and focus on transformation to ensure that reserves
are used for their intended purpose to and not to meet budget gaps.
At the 31 March 2025, the IJB general reserves balance is nil, which means any future overspends will need to be
fully met by the partner authorities. The table below outlines the movement in reserves during 2024/25:
In our previous audit, we recommended that the IJB continue to monitor the percentage level of adequate
reserves as funding gaps continue to grow and that the IJB should look to transformation in future years to
ensure reserves do not dip to an unsustainable level. This recommendation remains valid as the IJB have
budgeted to use earmarked reserves to balanced the 2025/26 budget, which will not be sustainable in future
years. 
The continued reliance on
reserves is not sustainable and
although it helps achieve a
balanced budget in 2025/26,
the IJB will not have sufficient
available earmarked reserves
to draw upon in order to meet
the 2026/27 funding deficit.
There is no general reserve
balance, and the level of
reserves is at an
unsustainable level.
General
Reserves
£m
PCIP & Action 15
£m
Other
Earmarked
£m
Total
£m
As at 31 March 2024 - 33 1.953 1.986
Transferred Out - (33) (0.503) (0.536)
Balance at 31 March
2025 - - 1.450 1.450
Page 175

Page 176

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – financial sustainability (5)
33
Wider scope
area
Wider scope audit response and findings Conclusion
Financial
sustainability
(continued)
Transformation Plans
The cumulative funding gap position in the next four years is significant and outlines serious concerns over the future
financial sustainability of the IJB where additional funding is not provided or where the IJB does not operate within its
funding allocation. This creates a risk, as Moray IJB will have to balance ensuring that it maintains financial sustainability
with ensuring that it continues its service delivery to meet its priorities.
To reduce the current funding gap, a major transformation programme will need to be undertaken. The IJB has
recognised the fact that it will require transformational redesign to reduce future funding gaps and reshape the
organisation to ensure efficient service delivery.
Substantial transformation is required to bring about financial sustainability. The size and scale of transformation
required to deliver the savings and efficiencies required to close the projected funding gap is unprecedented. It is
important that IJB members have oversight of the transformation programme to ensure the savings and efficiencies
required to reduce future funding gaps can be delivered.
Audit Scotland - Review of Integration Joint Boards
In March 2025, Audit Scotland published Integration Joint Boards: Finance Bulletin 2023/24 which provided an
independent analysis over the finances of Integration Joint Boards for financial year 2023/24. Key findings from the
report included:
• The majority of IJBs reported a deficit on the cost of providing services requiring unplanned use of reserves and
additional contributions from partner bodies.
• Total reserves held by IJBs have reduced by 40 per cent in 2023/24. Contingency reserves have almost halved,
limiting IJBs ability to address future deficits.
• The majority of the total planned savings were achieved, but a substantial proportion were achieved on a one-off basis
Several items raised in the Audit Scotland report are consistent with the issues that Moray IJB are facing and there is an
understanding that shape of service delivery will have to change in order to deliver services in a more sustainable manner.
To ensure financial
sustainability for the medium
to longer term, the IJB will
need to ensure that it is able
to deliver increased income
and efficiency initiatives to
reduce costs and deliver
financial benefits. The IJB will
need to upscale the pace and
delivery of transformation to
achieve and mitigate the risk
of becoming financially
unsustainable.
Moray IJB are facing several
of the issues raised in the
Audit Scotland report and are
reviewing how they can
provide services in a more
sustainable manner.
Page 176

Page 177

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance
34
Wider scope area Wider scope audit response and findings Conclusion
Vision, leadership
and governance
No risk identified
Leadership and Committee Effectiveness
Moray IJB hold a committee-based structure which has delegated functions to several committees who
subsequently become responsible for the administration of services. There are currently three different
committees, namely the Board, the Audit, Performance and Risk Committee and the Clinical and Care
Governance Committee.
The Audit, Performance and Risk Committee undertakes the role of Those Charged with Governance (TCWG)
and looks to consider reports and obtain assurance through internal and external audit reports concerning the
IJB’s functions. The Committee also obtains assurance over performance monitoring and receive reports on the
performance of and trends within the IJB’s services in terms of service standards and performance information.
Monitoring of action plan progress and service performance in key areas is reported to ensure a process of
continuous improvement. This allows the IJB the opportunity to evaluate on strengths and weaknesses and draw
any themes arising from results of self evaluations. It also enables the implementation of any necessary action
plans to support continuous improvement in priority areas and ensure it is demonstrating compliance against the
CIPFA Code of Principles for Delivering Good Governance (revised 2016).
In our previous audit, we recommended that the IJB and Moray Council need to secure permanent positions for
the Chief Officer and Chief Social Worker at the Council, to provide certainty over the future direction of the IJB.
The IJB appointed a Chief Officer on an interim basis in July 2024, with the appointment being made permanent
in November 2024.
The Chief Social Worker at the Council left in May 2024, with a replacement Chief Social Worker appointed on
an interim basis in the same month. To date, no permanent appointment has been made, and the post continues
to be filled on an interim basis. A recruitment process is underway to find a permanent replacement.  The
previous audit recommendation remains valid until a permanent appointment has been made.
Our review of attendance of
members at Committee
meetings has not flagged any
issues. We are satisfied that the
governance arrangements are
appropriate and operate
effectively.
We conclude that the Audit,
Performance and Risk
Committee effectively
challenge and scrutinize reports
presented and ensure effective
decision making.
The Council are actively
recruiting a permanent Chief
Social Worker.
Page 177

Page 178

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (1)
35
Wider scope
area
Wider scope audit response and findings Conclusion
Vision,
leadership and
governance
(continued)
Governance Statement
The Governance Statement details the composition and governance structure of Moray IJB and how that supports the
achievement of the organisation’s priority themes. From review of the Statement, we are satisfied that it reflects the
key findings from audit, scrutiny and inspection, including details of the limited assurance Internal Audit opinion
issued for 2024/25 (see Internal Audit section for further detail).
Risk Management
The IJB maintains a strategic risk register which sets out the inherent risks being faced by the IJB, together with a
current assessment on the level of the risks and mitigating actions being taken to reduce the impact of the risks.
As part of the risk monitoring framework, the Strategic Risk Register was subject to review during 2024/25 and was
co-developed with Board members during a development session in October 2024. The updated Strategic Risk
register was formally approved by the Board in May 2025. The risk register is reviewed monthly by the Senior
Management Team, updated and presented biannually to the Audit, Performance and Risk Committee, and annually
to the Moray IJB Board for oversight. Any emerging or increasing risks are presented as required outside of the agreed
reporting cycle.
Changes made to the risk register since it was last presented to the Committee are easily identifiable and are
highlighted to members. Risk scores are weighted, based on assessment according to their likelihood and
corresponding impact as set out in the Risk Appetite Statement. The most recent risk register presented to the Board
included one “very high” risk identified by the IJB as follows:
• The MIJB must operate within the resources allocated to it by the partner bodies and it is good financial practice to
set a balanced budget at the start of each financial year. There is a risk that Financial pressures being experienced
by the funding partners will directly impact the MIJB’s strategic planning of services and its decision-making.
This risk and the mitigating actions the IJB are implementing in response are in in line with our findings reported in the
financial sustainability section of this report. 
The Strategic Risk Register
has been updated during
2024/25 and we are
satisfied that the key risks
have been identified and
that the pace of
improvement is appropriate
to the risks and challenges
facing Moray IJB.
The IJB has in place a wide
range of policies and
procedures designed to
ensure compliance with laws
and regulations, including
for example financial
regulations and standing
orders. Our review of these
policies have found the
policies to be relevant and
promoted within the
organisation.
Page 178

Page 179

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (2)
36
Wider scope
area
Wider scope audit response and findings Conclusion
Vision,
leadership and
governance
(continued)
Internal Controls
The IJB has in place a range of policies and procedures designed to ensure compliance with laws and
regulations, including for example financial regulations and standing orders. The date of approval and
adoption by the Board for the Standing Orders was May 2022. The Financial Regulations were updated in
May 2025 and approved by the Board.
The IJB does not have its own separate code of conduct, whistleblowing or fraud policies and follows those set
out by the partner organisations.
Internal Audit
Internal audit activity is undertaken by the Audit and Risk Manager of Moray Council, who was appointed as
the Chief Internal Auditor of Moray IJB in 2022, for a period of two years to 31 March 2024. This was extended
by a further two years following approval at the May 2024 Board meeting.
Internal audit undertook the following reviews during the financial year:
• An audit of the administrative arrangements for fostering and kinship care payments.
• A review of the IJB’s governance arrangements to prevent fraud and corruption.
• An audit of the systems and procedures supporting the delivery of services to individuals receiving adult
care services who are classified as out of area (OOA).
• A  review of residential care to examine the processes for making accurate payments at agreed contract
rates to third-party providers for the delivery of permanent residential care.
• Follow-up audits of Self-Directed Support and Moray Integrated Community Stores
As a result of the reviews, Internal Audit identified several audit recommendations.  This resulted in an overall
assurance opinion for the 2024/25 financial year of limited assurance.
The IJB has in place a wide range
of policies and procedures
designed to ensure compliance
with laws and regulations,
including for example financial
regulations and standing orders.
Our review of these policies have
found the policies to be relevant
and promoted within the
organisation.
The IJB have an effective internal
audit function in place to assist
with assurance over governance
framework, risk and internal
controls.
Page 179

Page 180

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (3)
37
Wider scope area Wider scope audit response and findings Conclusion
Vision, leadership
and governance
(continued)
Internal Audit (continued)
The internal audit opinion notes that “the Service has made progress by introducing improved governance
arrangements, notably through regular reporting on the implementation of audit recommendations at Senior
Management and Practice Governance Board meetings. However, significant findings have emerged from the
audits undertaken, and follow-up reviews have identified recommendations that remain outstanding and
require revised implementation dates. Furthermore, advancing the development of a single case recording
system within the Service continues to be a matter of significant importance. After careful consideration, it is
my opinion that I can only provide limited assurance that the Moray Integration Joint Board has adequate
systems of governance and internal control.”
This is the fourth year in succession that Internal Audit have provided a limited assurance opinion. 
Fundamentally, this indicates there are weaknesses in the framework of governance, risk management and
control. We have previously reported that the IJB should ensure audit recommendation dates are realistic and
monitored for implementation and it is clear that the IJB must aim to implement internal audit
recommendations at a faster pace to move away from limited assurance opinions. Our recommendation
remains valid
As outlined, as part of their review of process at the IJB, internal audit make recommendations for
management in order to improve controls.  The IJB have introduced an internal audit recommendations
tracker, however this is not presented to each Audit, Performance and Risk Committee meeting. In our previous
audit, we recommended that the tracker of internal audit recommendations is reviewed periodically and
reported to each Audit, Performance and Risk Committee meeting.  During 2024/25, the IJB have agreed that
internal audit recommendations will be reviewed at Operational Management Team (OMT) meetings, with
monthly escalations to Senior Management Team (SMT) meetings on an exception basis. If SMT deem any
issues require escalation, a report would then be compiled for reporting to the Audit, Performance and Risk
Committee.
This is the fourth year in
succession that Internal Audit
have provided a limited
assurance opinion. 
Fundamentally, this indicates
there are weaknesses in the
framework of governance, risk
management and control. The
IJB should have definitive plans
in place to avoid further limited
assurance opinions.
The recommendations made by
internal audit span multiple
years and the IJB must ensure
that audit recommendations
are actioned in a timely
manner. Our prior year
recommendation raised
remains valid.
Page 180

Page 181

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (4)
38
Wider scope area Wider scope audit response and findings Conclusion
Vision, leadership
and governance
(continued)
Internal Audit (continued)
We had also reported previously that the IJB should create a mechanism to monitor progress against
external audit recommendations. The IJB presented a report to the IJB on 27 March 2025 detailing progress
made with external audit recommendations, and progress updates will continue to be reported on a regular
basis.
The Audit, Performance and Risk Committee received quarterly audit and inspection reports from internal
audit which outlined the work undertaken in each quarter alongside any follow up audits and the results of
the audits.  This provides Audit, Performance and Risk Committee members the opportunity to gain
assurance that internal controls are operating as expected.
We had previously reported that the IJB should look to strengthen the reporting of NHS Grampian’s internal
audit results.  In prior years, the reporting had been heavily weighted towards activity at Moray Council,
with limited updates on the results of internal audit activity at the health board. An agreement has now been
reached with the management of NHS Grampian and their Internal Audit Provider to allow the Chief Internal
Auditor to confidentially report NHS Grampian's internal audit reviews of systems and practices of interest
to the IJB to the Audit, Performance, and Risk Committee. This improves the level of oversight members have
and provides a complete picture of both organisations.
Joint inspection of adult support and protection: review of progress in the Moray partnership
The Care Inspectorate published a report in October 2024 detailing the results of a progress review carried
out by the Care Inspectorate, Healthcare Improvement Scotland and His Majesty’s Inspectorate of
Constabulary in Scotland, following a previous joint inspection of adult support and protection conducted in
2022.
The results of both Moray Council
and NHS Grampian internal audit
activity is now reported to the
Audit, Performance and Risk
Committee.
Improvements were noted by the
Care Inspectorate in relation to
the delivery of adult support and
protection.
Page 181

Page 182

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – vision, leadership and governance (5)
39
Wider scope area Wider scope audit response and findings Conclusion
Vision, leadership
and governance
(continued)
Joint inspection of adult support and protection: review of progress in the Moray partnership (continued)
The progress review concluded that the Moray partnership’s efforts to implement seven priority areas for
improvement were timely, rigorous and effective. Inspectors found that key processes for adult support and
protection that required improvement were now demonstrably sound and effective. This improved the
safety, health, and wellbeing outcomes for adults at risk of harm.
Some improvement areas were identified by the Care Inspectorate, notably the provision of risk assessments
for all adults at risk of harm who require them, and the quality of recording adult support and protection
matters in health records.
In November 2024, the IJB approved the Adult Support and Protection (ASP) Improvement Action Plan
following the inspection. A progress report outlining the progress made towards each of the planned actions
is presented at each sitting of the Adult Protection Committee. The IJB have agreed that any reporting to the
Board will be by exception.
Joint Strategic Needs Assessment
All integration authorities are required to oversee the production of Joint Strategic Needs Assessments
(JSNA) to analyse the needs of local populations and to inform and guide the commissioning of health,
wellbeing and social care services within their area.
The revised JSNA for adults was approved by the Moray IJB on 26 September 2024.
The findings from the JSNA were
considered when preparing the
new Strategic Delivery Plan. 
Page 182

Page 183

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources
40
Wider scope area Wider scope audit response and findings Conclusion
Use of resources
to improve
outcomes
No risk identified
Strategic Planning
The IJB have a Strategic Plan covering 2022-2032. The Strategic Plan identifies the IJB’s strategic themes:
• Building Resilience - Taking greater responsibility for health and wellbeing
• Home First - Being supported at home or in a homely setting as far as possible
• Partners in Care - Making choices and taking control over decisions affecting care and support
Underpinning these themes are several objectives which detail how the IJB will achieve each objective.
To support the delivery of the Strategic Plan, the IJB approved the Strategic Delivery Plan 2025 – 2028 at the
IJB Board meeting on 27 March 2025.  The Strategic Delivery Plan sets out the programme of
transformational and improvement work underway to enable the IJB to meet its strategic priorities. The
Strategic Plan itself is also supported by the IJB's Workforce Plan, Medium Term Financial Strategy and
Commissioning and Procurement Plan. 
The Strategic Delivery Plan reflects the key actions being driven by the IJB over the next three years. It is a live
document, meaning the IJB can be responsive to new or emerging priorities.  The Strategic Delivery Plan
provides high level information about each action, and links to strategic objectives and strategic themes. This
includes a key summary and the priority tasks that will be undertaken. A lead action owner is identified
alongside a timescale for completion. 
Progress of the Strategic Delivery Plan is monitored by the Senior Management Team (SMT) and the Strategic
Planning and Commissioning Group (SPCG), with a summary report to the Board every six months. A high-
level summary of performance against the outcomes of the Strategic Delivery Plan is also reported to the
Audit, Performance and Risk (APR) Committee on a quarterly basis.
The IJB have approved the new
Strategic Delivery Plan which
identifies the set of actions the
IJB will complete in order to
deliver its strategic objectives.
There are clear links between
the Strategic Plan and
Strategic Delivery Plan with a
clear set of actions laid out in
the Strategic Delivery Plan
Page 183

Page 184

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (1)
41
Wider scope area Wider scope audit response and findings Conclusion
Use of resources
to improve
outcomes
(continued)
Performance Reporting
A performance report is published annually which outlines the IJB’s annual performance against the strategic
priorities of the Health and Social Care Partnership and evidencing some of the key achievements and challenges
faced by the IJB. Furthermore, the report provides details on the IJB’s performance in relation to the Scottish
Government’s core suite of national integration indicators which allows comparisons to be made over time and
against Scotland as a whole.
We have previously reported that management should review the format of the Performance Report and content
to ensure it is succinct, focuses on the IJB’s performance and outcomes, and supports the user of the financial
statements to understand the IJB’s purpose and achievements in year.  This has not been actioned during
2024/25 and remains an open action for implementation.  The IJB have confirmed that the Performance
Management Framework will be reviewed in 2025/26 following the approval of the Strategic Delivery Plan.
Our review of the 24/25 performance report highlights that out of the 19 national indicators reported:
• nine were showing as green (IJB performance has improved from last year),
• four indicators were showing as amber (performance is similar to last year)
• five were showing as red (performance is worse than previous year.
There was one indicator that data is not available for reporting.
The red indicators in the performance report, where the IJB’s performance worsened during 2024/25 are detailed
on the following page.
The performance report notes that national indicators 1-9 only report performance information every two years
and therefore the comparisons being made relate to 2023/24 performance, not 2024/25 performance for these
nine indicators.
We have obtained assurance
that appropriate
performance monitoring and
reporting arrangements are in
place at the IJB, and where
indicators are worsening, the
IJB then agree upon actions
that need to be taken to
improve performance.
The IJB’s performance is
showing a general trend of
improvement against the
national indicators.
Page 184

Page 185

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (2)
42
Wider scope
area
Wider scope audit response and findings Conclusion
Use of
resources to
improve
outcomes
(continued)
Performance Reporting (continued)
Source: 2024/25 Annual Performance Report
Note: National Indicators 1-9 are based on the HACE survey which is undertaken every two years. 2024/25 figures
remain the same as reported in 2023/24 Annual Performance Report.
Moray faces the challenge of an increasing older population with a decline in working age population, staff
recruitment challenges and lack of available accommodation against a backdrop of significant financial challenge.
Adult social care is widely publicised as being under pressure in all local government authorities, so this issue is not
specific to Moray IJB.
The IJB will need to ensure
that it is able to continue to
deliver safe and effective
adult services considering the
challenging financial
background faced alongside
a growing aging
demographic. This will require
wider transformation of the
IJB which is outlined within
the Financial Sustainability
section of this report.
National Indicator (Moray IJB reporting as red) 2023/24 2024/25 Scotland
Avg. (24/25)
2. Percentage of adults supported at home who agree that they
are supported to live as independently as possible
72% 72% 72%
3. Percentage of adults supported at home who agree that they
had a say in how their help, care or support was provided
59% 59% 60%
8. Percentage of carers who feel supported to continue in their
caring
28% 28% 31%
9. Percentage of adults supported at home who agree they felt
safe
70% 70% 73%
17. Inspectorate inspections 81.1% 73.8% 81.9%
Page 185

Page 186

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (3)
43
Wider scope
area
Wider scope audit response and findings Conclusion
Use of
resources to
improve
outcomes
(continued)
Performance Reporting (continued)
The IJB have an agreed set of local performance indicators, with updates reported each quarter to the Audit,
Performance and Risk Committee. Performance is reported in a RAG status, with five of the eleven indicators within
agreed tolerance levels
The table below shows the performance of each indicator as at March 2025:
The IJB’s performance
against its local indicators is
mixed, with six indicators
below agreed target levels.
Target 2024/25 RAG
A&E attendance rate per 1000 population all ages 21.9 22.0
Number of Delayed Discharges (including code 9) at census point 26 40
Number of bed days occupied by delayed discharges (incl. code 9) at
census point
850 1149
Rate of emergency occupied bed days for over 65s per 1000 population 2681 2412
Emergency admission rate per 1000 population for over 65’s 187 177.8
Number of people over 65 years admitted as an emergency in the
previous 12 months per 1000 population
131 125.7
% Emergency readmissions to hospital within 7 days of discharge 3.7% 3.9%
% Emergency readmissions to hospital within 28 days of discharge 7.9% 7.4%
% of patients commencing Psychological Therapy Treatment within 18
weeks of referral
90% 65%
NHS Sickness Absence (% of hours lost) 4% 4.9%
Council Sickness Absence (% of calendar days lost) 4% 8.2%
Page 186

Page 187

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Wider scope audit – use of resources (4)
44
Wider scope area Wider scope audit response and findings Conclusion
Use of resources to
improve outcomes
(continued)
Performance Reporting (continued)
The performance monitoring reports taken to the Audit, Performance Risk Committee clearly indicate the
planned actions to address each indicator assessed as below target. The reports identify mitigations the IJB
have agreed to achieve improvement in each indicator, and these are monitored via the reporting to the
Committee.
Performance Framework Development
Following the approval of the Strategic Delivery Plan, a review of the performance management framework is
underway. The IJB have appointed a Senior Performance Officer as part of the review process. The IJB intend
to develop a refreshed set of performance indicators as part of the review. Reporting arrangements are also
being developed to ensure there is more clarity between activity and outcomes and to support the delivery of
the strategic priorities set out in the Strategic Delivery Plan plan
The IJB are carrying out a
review of the Performance
Framework with updates
planned to be in place by the
end of 2025.
Page 187

Page 188

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Best value conclusions
45
Under the Code of Audit Practice, the audit of Best Value in Integration Joint Boards is fully integrated within the annual audit work performed by appointed
auditors and their teams. As part of our integrated wider-scope annual audit work, we as appointed auditors use a risk-based approach to assess and report
whether the IJB has made proper arrangements for securing Best Value and how the body demonstrates that it is meeting Best Value responsibilities.
The principles of best value are embedded within the wider scope work we perform, and the judgements made within the wider scope work allow us to make an
assessment over Best Value.
Conclusion
Integration Joint Board’s have a statutory duty to have arrangements to secure Best Value. To achieve this, Integration Joint Boards should have effective
processes for scrutinising performance, monitoring progress towards the strategic objectives and holding partners to account. The IJB have arrangements in place
to secure Best Value, as demonstrated in the Annual Governance Statement. We consider these arrangements as part of our regular wider scope work and have
provided our conclusions.
We have noted that the IJB have no mechanism for formally reviewing and reporting on the arrangements to secure best value. We recommend that the IJB should
undertake a formal review of the Best Value assurance framework and complete an assessment of the arrangements to secure Best Value. The outcome of the
assessment should be reported to the Audit, Performance and Risk Committee at the end of each financial year, with reference made to this assessment in the
Annual Governance Statement. See recommendation raised at Appendix B.
Page 188

Page 189

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Appendices
46
Page 189

Page 190

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments
Impact of adjusted misstatements
During the course of the audit, there were no adjusted non-trivial misstatements which were made that require reporting within our Annual Audit Report.
Impact of unadjusted misstatements
During the course of the audit, there were no unadjusted non-trivial misstatements which were made that require reporting within our Annual Audit Report.
Impact of unadjusted misstatements in the prior year
There was no unadjusted misstatement identified in the prior year audit.
47
We are required to report all non-trivial misstatements to those charged with governance, whether or not the accounts have been adjusted by management.
Page 190

Page 191

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
A. Audit adjustments (2)
Misclassification and disclosure changes
The table below provides details of substantive misclassification and disclosure changes identified during the audit which have been made in the final set of
financial statements. This list of misclassification and disclosure changes reflects presentational adjustments to the financial statements which have no impact on
the Council’s reported financial position.
48
Disclosure Auditor recommendations Adjusted?
General There were minor changes noted to grammar and to correct spelling and other consistency issues.  The health
board has corrected these in the final version of the financial statements. Such changes are are expected and
do not warrant detailed explanation.
Yes
Other Information We identified changes were required to the Moray Integration Joint Board members disclosure to accurately
reflect membership during 2024/25.
Yes
Management
Commentary
We identified that detail should be added into the Management Commentary to explain the underspend in
Strategic Funds and Other Resources budget.
Yes
Governance
Statement
We identified that additional disclosure should be added to confirm the processes in place to monitor the
implementation of audit recommendations.
Yes
Remuneration Report We identified that all references to Interim Chief Officer should be removed as the position was made permanent
in November 2024.  We identified a difference of £2k in the lump sum calculation for the Chief Officer.  The
accounts were amended to include the correct figure.
Yes
Note 4 - Expenditure
and Income Analysis
by Nature
We identified that the audit fee disclosure should be amended to state the final agreed audit fee. Yes
Page 191

Page 192

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
B. Action plan and recommendations – wider scope and best value
49
We have set our below, based on our audit work undertaken in 2024/25, the key recommendations arising from our wider scope and best value audit work:
Recommendation Agreed management response
1. Financial Management – Reporting of savings
The budget and financial reports presented to the Board and Audit, Risk and
Performance Committee do not detail whether savings are expected to be
recurring in nature. Adding this context into both documents would provide a
clear indication as to whether savings are expected to be one off savings or
whether the benefit will continue in future years.
The IJB prepare a year-end outturn which includes the final high-level savings
position. However, this report does not include the appendix presented as part
of the in-year monitoring reports detailing the final delivery position. It would
be good practice to provide this same level of detail as part of the year-end
outturn report which allows a comparison across the full financial year.
Recommendation:
The IJB should indicate whether savings are expected to be recurring or non-
recurring in nature.
The IJB should prepare a report showing a breakdown of savings delivered on
a project basis as part of the year-end outturn report.
Summary has previously been shown at year end but detailed workings always
available and this recommendation can easily be implemented along with
recurring and non-recurring savings for the next report due.
Action Owner: Chief Finance Officer
Timescale for implementation: 30 June 2026
Page 192

Page 193

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
B. Action plan and recommendations – wider scope and best value (2)
50
Recommendation Agreed management response
2. Assessment over the arrangements to secure Best Value
We have noted that the IJB have no mechanism for formally reviewing and
reporting on the arrangements to secure best value.
Recommendation:
The IJB should undertake a formal review of the Best Value assurance
framework and complete an assessment of the arrangements to secure best
value. The outcome of the assessment should be reported to the Audit,
Performance and Risk Committee.
The IJB will complete a self assessment for best value assurance for the end of
the financial year.
Action Owner: Chief Finance Officer
Timescale for implementation: 31 March 2026
Page 193

Page 194

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
C. Follow up of prior year recommendations
51
We identified the following issues in our prior year wider scope work, which resulted in twelve recommendations being reported in our 2023/24 Audit Findings Report.
We have performed additional work in year to obtain assurance whether the recommendations have been closed and resolved in the current year or whether the
issue still exists and the recommendation remains open and/or in progress. Six out of twelve recommendations have been cleared with one in progress and five still
open.
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Management update on actions
taken to address the issue
Auditor conclusion
Closed Revenue Budget Setting
The IJB is required to set its budget before the end of March.
Whilst the IJB set a working budget on 28 March 2024 it did
not formally approve the 2024/25 revenue budget until 30 May
2024.
Recommendation:
The IJB should ensure it presents its final budget, with all
agreed savings, before the start of the financial year
Work has been ongoing
throughout 2024/25 to produce
a balanced budget for 2025/26
which was presented to the
Moray IJB Board on 27 March
2025
The IJB presented the 2025/26 budget to the
Board on 27 March 2025, in advance of the
start of the financial year and in line with
required timescales.
[Red] Recommendation is open
[Amber] Recommendation is in progress
[ Green] Recommendation is closed
Page 194

Page 195

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
C. Follow up of prior year recommendations (2)
52
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Management update on actions taken to
address the issue
Auditor conclusion
Open Financial Sustainability – Reserves
The IJB intend to utilise £1.346 million of earmarked reserves
to bridge the budget deficit in 2024/25. There is a risk that
continued reliance on reserves to bridge funding gaps will
create financial sustainability issues for the IJB.
Recommendation:
The IJB will need to continue to monitor the percentage level
of adequate reserves as funding gaps continue to grow and
the IJB looks to transformation in future years to ensure
reserves do not dip to an unsustainable level.
Consideration has been given to the level
of reserves in the IJB and the savings
achieved are not able to provide a level
of general reserves for 2025/26. For
2025/26 budget the IJB again intends to
utilise £1 million of ear marked reserves to
bridge the budget deficit. The latest Audit
Scotland publication makes reference to
the fact a significant number of IJBs are
using reserves and not just unique to
Moray.
The 2025/26 budget has been agreed,
with the IJB intending to use £1.000
million of earmarked reserves balances.
The IJB have a limited amount of
reserves balances (£1.450 million as at
end of 2024/25) and continued use of
reserves balances to manage the
funding gap is not sustainable. The IJB
should aim to bridge funding gaps
through transformation and identifying
alternative ways to deliver services.
Recommendation remains valid.
Revised Target Date: 31 March 2026
Closed Medium-Term Financial Strategy
The Medium-Term Financial Strategy was last updated in
March 2023 and is considered out of date. If the plan is not
updated on a regular basis, there is a risk that the IJB are
unaware of the potential funding implications over the
medium term.
Recommendation:
The IJB should re-evaluate the financial outlook over the
medium term and update the Medium-Term Financial
Strategy to identify the total funding gap over the medium
term.
The updates to the Medium-Term
Financial Framework (MTFF) were
delayed, however the MTFF has now
been refreshed and was presented at the
Moray IJB Committee meeting on 27
March 2025.
The MTFF has been updated and
provides detail on the financial
pressures for 2025/26 and beyond. The
funding gap to 2029/30 is estimated to
be £18.2 million.
Page 195

Page 196

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
C. Follow up of prior year recommendations (3)
53
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Management update on actions taken to
address the issue
Auditor conclusion
Closed Reporting of NHS Grampian Internal Audit Activity
Internal audit reporting is heavily based on activities within
Moray Council. Moray IJB should look to strengthen the
reporting of NHS Grampian’s internal audit results within the
IJB to provide oversight to members and to provide a
complete picture of both organisations.
Recommendation:
To ensure oversight of NHS Grampian internal audit reports,
reporting to the Audit, Performance and Risk Committee
needs to be strengthened.
Implemented – An agreement has now
been reached with the management of
NHS Grampian and their Internal Audit
Provider to allow the Chief Internal
Auditor to confidentially report NHS
Grampian's internal audit reviews of
systems and practices of interest to the
MIJB to the Audit, Performance, and Risk
Committee
NHS Grampian Internal Audit report
which are relevant to the IJB are now
reported in private to the Audit,
Performance and Risk Committee. This
ensures IJB members have oversight of
the reporting of NHS Grampian internal
audit activity.
In progress Senior Management Team
Following the retirement of the previous Chief Officer, the
current Chief Officer has been appointed on an interim
basis. Furthermore, the Chief Social Worker at the Council is
also appointed on an interim basis.
Recommendation:
The IJB and Council need to secure permanent positions for
the both posts to provide certainty over the future direction
of the IJB.
Following an open recruitment process a
permanent Chief Officer was appointed
in November 2024, the role being offered
and accepted by the person undertaking
the role as an interim.  Given this, they
were able to start in the permanent role
immediately. A process will now be
undertaken to recruit to the permanent
CSWO role.
The IJB have recruited a permanent
Chief Officer who has been in role since
November 2024 and had previously
been appointed on an interim basis. To
date, no permanent appointment has
been made to the CSWO role meaning
this recommendation is in progress.
Recommendation is in-progress.
Revised Target Date: 31 March 2026
Page 196

Page 197

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
C. Follow up of prior year recommendations (4)
54
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Management update on actions
taken to address the issue
Auditor conclusion
Open Internal Audit Limited Assurance Opinion
This is the third year in succession that Internal Audit
have provided a limited assurance opinion. 
Fundamentally, this indicates there are weaknesses in
the framework of governance, risk management and
control.
Recommendation:
The IJB should have definitive plans in place to avoid
further limited assurance opinions.
Progress has been made,
however there are still concerns
with the recommendations being
implemented following audits,
progress on CareFirst and
realisation of the savings,
resulting in the Internal Audit
Manager providing another
limited assurance opinion in
2024/25.
This is the fourth year in succession that Internal Audit
have provided a limited assurance opinion. 
Fundamentally, this indicates there are weaknesses in
the framework of governance, risk management and
control. The IJB still require to put definitive plans in
place to avoid further limited assurance opinions.
Recommendation remains valid.
Revised Target Date: 31 March 2026
Closed Internal Audit Recommendations
As part of their reviews, internal audit make
recommendations for management to action.  Whilst
the IJB have introduced a recommendations tracker,
this is not presented to each Audit Committee
meeting.
Recommendation:
The IJB should ensure that the tracker of internal audit
recommendations is reviewed periodically and
reported to each Audit, Risk & Performance Committee
meeting.
Tracker has been completed and
ownership agreed at OMT
meetings, with monthly
escalations to SMT on an
exception basis. Then if SMT
deem it should be escalated to
APR a report will be compiled.
The IJB have introduced an internal audit
recommendations tracker, however this is not
presented to each Audit, Performance and Risk
Committee meeting. During 2024/25, the IJB have
agreed that internal audit recommendations will be
reviewed at Operational Management Team (OMT)
meetings, with monthly escalations to Senior
Management Team (SMT) meetings on an exception
basis. If SMT deem any issues require escalation, a
report would then be compiled for reporting to the
Audit, Performance and Risk Committee. This
approach is deemed to be reasonable and
recommendation can be closed.
Page 197

Page 198

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
C. Follow up of prior year recommendations (5)
55
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Management update on actions taken to
address the issue
Auditor conclusion
Open Performance Report - Recommendation:
Management should review the format of the Performance
Report and content to ensure it is succinct, focuses on the
IJB’s performance and outcomes, and supports the user of
the financial statements to understand the IJB’s purpose
and achievements in year.
Due to continuation of limited staffing
resources this has not been able to be
achieved in this financial year. The
performance will be reviewed for
2025/26 following the approval of the
Strategic Delivery Plan which was
presented to the Moray IJB Committee
on 27 March 2025
There has been no updates to the
format of the Performance Report in
2024/25.
Recommendation remains valid.
Revised Target Date: 31 March 2026
Closed Financial Sustainability – Reserves – Recommendation:
The IJB will need to continue to monitor the percentage level
of adequate reserves as funding gaps continue to grow and
the IJB looks to transformation in future years to ensure
reserves do not dip to an unsustainable level.
There have been no general reserves
maintained in the IJB and the level of
earmarked reserves has decreased as
they have been used during the year.
This recommendation has been
superseded by a further
recommendation on reserves balances
and is now closed. 
Page 198

Page 199

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
C. Follow up of prior year recommendations (6)
56
Recommendations from the wider scope audit
Assessment Issue and risk previously communication Management update on actions
taken to address the issue
Auditor conclusion
Open Financial Sustainability - Transformation -
Recommendation:
A depth of pace will need to be undertaken on the
transformation programme to ensure the IJB can bridge the
significant funding gap in a short space of time, to ensure
that not only efficiencies can be delivered but that financial
sustainability can be achieved. To ensure financial
sustainability for the medium to longer term, the IJB will
need to ensure that it is able to deliver increased
productivity and efficiency initiatives to reduce costs and
deliver financial benefits. The IJB will need to upscale the
pace and delivery of transformation to achieve and mitigate
the risk of becoming financially unsustainable.
Savings plan in place for 2024/25
covered two financial years and
the savings plan in place for
2025/26 will again be over more
than one financial year.
Transformation plans are also
part of the savings plan for future
years.
The IJB understand the need for
transformational change however the 2025/26
budget monitoring outlines that the IJB is
projecting to overspend by £4.685 million.
The recommendation remains relevant as the
IJB need to continue to look for alternative
means of service delivery which will increase
productivity and the efficiency of the service.
Recommendation remains valid.
Revised Target Date: 31 March 2026
Closed Best Value – External Audit Action Log - Recommendation:
Moray IJB should create a mechanism to monitor progress
against external audit recommendations and the report
should be brought to the relevant Committee on a regular
basis to ensure scrutiny and challenge by members.
Included in the papers for IJB on
27 March 2025 and will be
scrutinised on a regular basis
thereafter
The IJB presented a report to the Audit,
Performance & Risk Committee meeting in
March 2025 which provided a progress update
on external audit recommendations. This will be
a standard agenda item going forward.
Page 199

Page 200

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
C. Follow up of prior year recommendations (7)
57
Recommendations from the wider scope audit
Assessment Issue and risk previously
communication
Management update on actions
taken to address the issue
Auditor conclusion
Open Vision, Leadership and Governance –
Internal Audit – Recommendation:
Moray IJB should ensure audit
recommendation dates are realistic
when set and are monitored for
implementation. Where dates are
moved or not met, a thorough
understanding and follow up of these
should be sought and explanations
provided. A mechanism should be
implemented to follow up on officers
should missing recommendation
deadlines becomes regular.
Tracker has been completed and
ownership agreed at OMT meetings,
with monthly escalations to SMT on
an exception basis. Then if SMT
deem it should be escalated to APR
a report will be compiled.
The Internal Audit Annual Report confirmed that the follow-up
audits undertaken during 2024/25 found a number of
recommendations where revised timescales for the
implementation of recommendations were required. The need to
revisit audit reviews to evidence the implementation of
recommendations has resulted in an additional workload
commitment for the Internal Audit Section.
The implementation of recommendations is a key determinant in
assessing the adequacy and effectiveness of the internal control
system. If recommendations are not implemented in a timely
manner, then weaknesses in control and governance frameworks
will remain.
The lack of response to previous recommendations is one of the
reasons for the limited audit assurance opinion issued by Internal
Audit. Whilst we recognise the IJB have agreed an approach to
monitoring existing recommendations, focus must be given to
implementing these recommendations.
Recommendation remains valid.
Revised Target Date: 31 March 2026
Page 200

Page 201

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
D. Audit fees, ethics and independence
58
Independence and ethics
We confirm that there are no significant facts or matters that impact on our independence as auditors that we are required or wish to draw to your attention and
consider that an objective reasonable and informed third party would take the same view. We have complied with the Financial Reporting Council's Ethical Standard
and confirm that we, as a firm, and each covered person, are independent and are able to express an objective opinion on the financial statements.
We confirm that we have implemented policies and procedures to meet the requirement of the Financial Reporting Board’s Ethical Standard.
Ethical Standards and ISA (UK) 260 require us to give you timely disclosure of all significant matters that may bear upon the integrity, objectivity, and independence
of the firm or covered persons (including its partners, senior managers, managers and network firms). In this context, there are no independence matters that we
would like to report to you.
As part of our assessment of our independence we note the following matters:
Matter Conclusion
Relationship with Grant Thornton We are not aware of any relationships between Grant Thornton and Moray IJB that
may reasonably be thought to bear on our integrity, independence and objectivity
Relationships and investments held by individuals We have not identified any potential issues in respect of personal relationships with the
Entity or investments in the organisation held by individuals
Employment of Grant Thornton staff We are not aware of any former Grant Thornton partners or staff being employed, or holding discussions
in respect of employment, by the IJB as a director or in a senior management role covering financial,
accounting or control related areas.
Business relationships We have not identified any business relationships between Grant Thornton and Moray IJB.
Contingent fees in relation to non-audit services No contingent fee arrangements are in place, note that there are no non-audit services provided.
Gifts and hospitality We have not identified any gifts or hospitality provided to, or received from, a member of the
organisation's board, senior management or staff.
Page 201

Page 202

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
D. Audit fees, ethics and independence (2)
59
Fees and non-audit services
The tables below set out the total fees for audit and other services charged from the beginning of the financial year to the current date, as well as the threats to our
independence and safeguards have been applied to mitigate these threats. None of the below services were provided on a contingent fee basis.
For the purposes of our audit we have made enquiries of all Grant Thornton teams within the Grant Thornton International Limited network member firms providing
services to Moray IJB. The table summarises all non-audit services which were identified.
The final audit fee includes additional audit fee of £2,500 which has been agreed with the Chief Finance Officer. The planned audit fee included an additional fee for
significant additional work that is required in the wider scope analysis than would usually be expected.  This included a more detailed section on financial
sustainability appreciating the significance of savings and budget pressures in 2024/25 and beyond.
The Annual Audit Report will be considered by the Audit, Performance and Risk Committee on 24 October 2025 including agreement of audit fees.
External audit fee Fees for other non-audit services
Service
Planned
Fees
Final
Fees
External Auditor Remuneration - Baseline £36,450 £36,450
External Auditor Remuneration - Additional audit fee £2,500 £2,500
Pooled Costs £920 £920
Contribution to Performance Audit and Best Value £7,000 £7,000
Sectoral cap adjustment (£10,370) (£10,370)
2024/25 Audit Fee £36,500 £36,500
Service Fees £
We confirm that for 2024/25 we did not
receive any fees for non-audit services
Nil
The fees reconcile to the financial statements (round £’000 in the financial
statements):
• Fees per financial statements  £37,000
• Total fees as above  £36,500
The final audit fee with the additional fees is £36,500. The total fee is
£2,500 higher than the Audit Scotland indicative fee set.
Page 202

Page 203

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
E. Client Service Review
60
Client service
We take our client service seriously and continuously seek your feedback on our external audit service. Should you feel our service falls short of expected standards
please contact Joanne Brown, Head of Public Sector Assurance Scotland in the first instance who oversees our portfolio of Audit Scotland work
(joanne.e.brown@uk.gt.com). Alternatively, should you wish to raise your concerns further please contact Mark Stocks, Partner, 8 Finsbury Circus, London, EC2M
7EA. If you feedback relates to audit quality and we have not successfully resolved your concerns, your concerns should be reported to John Gilchrist, Audit Scotland
Quality and Appointments in accordance with the Audit Scotland audit quality complaints process.
Transparency
Grant Thornton publishes an annual Transparency Report, which sets our details of the action we have taken over the past year to improve audit quality as well as
the results of internal and external quality inspections. For more details see Transparency report 2024 (grantthornton.co.uk).
Page 203

Page 204

|© 2025 Grant Thornton UK LLP
Commercial in Confidence
Core
Core
Purple
Core
White
Primary
Bright
Purple
Dark
Purple
Secondary
Teal Coral
Neutral
Dark Mid Light
Yellow
Our communication plan Audit Plan
Annual Report (ISA
260 Report)
Respective responsibilities of auditor and management/those charged with governance 
Overview of the planned scope and timing of the audit, including planning assessment of audit risks and wider scope
risks 
Confirmation of independence and objectivity  
A statement that we have complied with relevant ethical requirements regarding independence. Relationships and other
matters which might be thought to bear on independence. Details of non-audit work performed by Grant Thornton UK
LLP and network firms, together with fees charged. Details of safeguards applied to threats to independence
 
Significant matters in relation to going concern  
Views about the qualitative aspects of Moray IJB’s accounting and financial reporting practices, including accounting
policies, accounting estimates and financial statement disclosures  
Significant findings from the audit  
Significant matters and issues arising during the audit and written representations that have been sought 
Significant difficulties encountered during the audit 
Significant deficiencies in internal control identified during the audit 
Significant matters arising in connection with related parties 
Identification or suspicion of fraud involving management and/or which results in material misstatement of the financial
statements 
Non-compliance with laws and regulations 
F. Communication of audit matters
61
RECOMMENDED CONTENT –
entities OTHER THAN PIEs
Guidance note
The requirements here are
relevant to entities that are not
PIEs.
For PIEs, delete the slide.
Red text may not be applicable
and should be either deleted or
amended as appropriate.
Page 204

Page 205

© 2025 Grant Thornton. All rights reserved.
‘Grant Thornton’ refers to the brand under which the Grant Thornton member firms provide assurance, tax and advisory services to their clients and/or refers to one or
more member firms, as the context requires. Grant Thornton International Ltd (GTIL) and the member firms are not a worldwide partnership. GTIL and each member firm
is a separate legal entity. Services are delivered by the member firms. GTIL does not provide services to clients. GTIL and its member firms are not agents of, and do not
obligate, one another and are not liable for one another’s acts or omissions.
GUIDANCE NOTES:
Please ensure every
presentation has a back
page with disclaimer
Page 205

Page 206

Page 206

Page 207

REPORT TO: AUDIT, PERFORMANCE & RISK COMMITTEE ON 29 OCTOBER 2025 
SUBJECT: 2024/25 AUDITED ANNUAL ACCOUNTS 
BY:  CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1 To submit to Committee the Audited Annual Accounts for the year then ended 31
March 2025. 
2. RECOMMENDATION 
2.1 It is recommended that Committee consider and scrutinise the Audited
Annual Accounts for the financial year 2024/25 and the letter of
Representation and recommend approval to the Moray Integration Joint
Board. 
3. BACKGROUND 
3.1      The Unaudited Annual Accounts for 2024/25 were submitted to the meeting of
the Audit, Performance and Risk Committee on 19 June 2025 prior to submission
to the Moray Integration Joint Board (MIJB) and external audit (paragraph 11 of
the Minute refers). 
3.2 The Annual Accounts have been prepared in accordance with International
Financial Reporting Standards and the Local Government (Scotland) Act 1973,
The Local Authority Accounts (Scotland) Regulations 2014 and the Local
Government in Scotland Act 2003. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1      The audit undertaken by the Board’s External Auditors, Grant Thornton is now
complete.  The External Auditors have expressed unqualified opinions in respect
of the financial statements, the remuneration report, the management
commentary and the annual governance statement.  The Independent Auditor’s
Report to the Members of the MIJB and the Accounts Commission is included
Item 11.
Page 207

Page 208

within the audited Annual Accounts and can be found on page 56.  The audited
Annual Accounts are attached at Appendix 1. 
4.2      Attached at Appendix 2, is the letter of representation to the External Auditors
from the members of the MIJB, for approval by Committee to be signed following
this meeting. 
4.3 The audit process highlighted changes to be made to the accounts which in the
main were presentational and in parallel with expectation following external
audit inspection. 
4.3 The Auditor’s Annual Audit Report to the MIJB and the Accounts Commission is
the subject of a separate report to this meeting.  The report sets out the
responsibilities of Grant Thornton as the independent auditor and presents a
summary of the findings arising from the 2024/25 audit.  The report confirms
there are no unadjusted misstatements in the annual accounts to report to those
charged with governance. 
4.4 The Audited Annual Accounts are presented to this meeting for consideration
and approval.  Thereafter, the Chief Officer, Chief Financial Officer and the Chair
of the Board will sign the accounts prior to submission to Grant Thornton prior to
publication. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Partners in
Care 2022 – 2032”
The Audited Annual Accounts have been completed within the statutory
timescales and are being presented for consideration and sign off. 
(b) Policy and Legal
The Public Bodies (Joint Working) (Scotland) Act 2014 requires that the
MIJB is subject to the audit and accounts provisions of a body under
Section 106 of the Local Government (Scotland) Act 1973.   
(c) Financial implications
The adjustments and revisions made to the Annual Accounts following the
external audit had no financial impact on the MIJB. 
(d) Risk Implications and Mitigation
There are no risk issues arising directly from this report.  The work
undertaken by Audit Scotland provides assurance to the Board that the
Annual Accounts for 2024/25 give a true and fair view in accordance with
applicable law and the 2024/25 Code of the state of affairs of the MIJB  as
at 31 March. 
(e) Staffing Implications
None arising directly from this report. 
(f) Property
Page 208

Page 209

None arising directly from this report. 
(g) Equalities/Socio Economic Impact
None arising directly from this report as there is no resultant change in
policy. 
(h) Climate Change and Biodiversity Impacts
There are no direct climate change and biodiversity implications as there
has been no change to policy. 
(i) Directions 
None arising directly from this report 
(j) Consultations
In preparation of the Annual Accounts, consultations have taken place
between finance staff of both Moray Council and NHS Grampian who are in
agreement within their areas of responsibility.   The Chief Officer has been
consulted and comments have been considered. 
6. CONCLUSION 
6.1 Following a completed external audit process and an unqualified opinion
being received.  The Audited Annual Accounts are presented here for
scrutiny and to recommend the MIJB approve and formally sign off. 
Author of Report: Deborah O’Shea, Chief Financial Officer
Background Papers:  With author
Ref: 
Page 209

Page 210

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25  Page 210

Page 211

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 
If you need information from the Moray Council in a
different language or format, such as Braille, audio tape
or large print, please contact: 
ياروم سلجم لبق نم تامولعم لىإ ةجاح ي ف متنك اذإ  نوكتو  ةغلب
وأ ويدوأ ةناوطسأ ،يا ربلا لثم فلتخم لكش لىعوأ ةفلتخم  نوكت نأ
مط ب لاصّتلإا ءاجّرلاف ةظيلغ فورح لامعتساب ةعوب 
Jei pageidaujate tarnybos Moray tarybos teikiamą informaciją gauti kitokiu
formatu, pvz., Brailio raštu, garso įrašu ar stambiu šriftu, kreipkitės: 
Jeśli potrzebują Państwo informacji od Rady Okręgu Moray w innym
formacie, takim jak alfabet Braille'a, kasety audio lub druk dużą czcionką,
prosimy o kontakt: 
Se necessitar de receber informações por parte do Concelho de Moray
num formato diferente, como Braille, cassete áudio ou letras grandes,
contacte: 
Ja Jums vajadzīga informācija no Marejas domes (Moray Council) citā
valodā vai formātā, piemēram, Braila rakstā, audio lentā vai lielā drukā,
sazinieties ar: 
ای نابز رگید یسک ےس لسنوک ےروم وک پآرگاتروص    راکرد تامولعم ںیم
لاثم ںوہ ˝    ،فورح ےڑب ای پیٹ ویڈآ ،ےلیربںیئامرف ہطبار رک امرف ینابرہم وت: 
Chief Finance Officer to the Moray Integration Joint
Board, High Street, Elgin, IV30 1BX 
accountancy.support@moray.gov.uk 
Page 211

Page 212

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 
Table of Contents 
MORAY INTEGRATION JOINT BOARD MEMBERS 2024/25 .............................................. 1
MANAGEMENT COMMENTARY .......................................................................................... 2
STATEMENT OF RESPONSIBILITIES ............................................................................... 27
REMUNERATION REPORT ............................................................................................... 29
ANNUAL GOVERNANCE STATEMENT ............................................................................. 33
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT ..................................... 44
MOVEMENT IN RESERVES STATEMENT ........................................................................ 45
BALANCE SHEET .............................................................................................................. 46
NOTES TO THE FINANCIAL STATEMENTS ..................................................................... 47
Note 1 Significant Accounting Policies ............................................................................. 47
Note 2 Critical Judgements and Estimation Uncertainty .................................................. 48
Note 3 Events after the Reporting Period ........................................................................ 49
Note 4 Expenditure and Income Analysis by Nature ........................................................ 49
Note 5 Taxation and Non-Specific Grant Income ............................................................. 50
Note 6 Debtors ................................................................................................................ 50
Note 7 Usable Reserve: General Fund ............................................................................ 51
Note 8 Agency Income and Expenditure .......................................................................... 52
Note 9 Related Party Transactions .................................................................................. 53
Note 10 VAT .................................................................................................................... 55
Note 11 Accounting Standards That Have Been Issued but Have Yet To Be Adopted .... 55
INDEPENDENT AUDITORS REPORT…………………………………………………………...56   
Page 212

Page 213

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 1 
MORAY INTEGRATION JOINT BOARD MEMBERS 2024/25 
Voting Members      
Dennis Robertson (Chair)   Grampian Health Board
Tracy Colyer (Chair)   Moray Council (Resigned 26/09/2024)
Elaine Kirby (Chair)    Moray Council (21/11/2024 to 31/07/2025)
Bridget Mustard (Vice-Chair)  Moray Council (Joined 1/08/2025)
Sandy Riddell    Grampian Health Board
Derick Murray    Grampian Health Board
Alex Stephen Grampian Health Board (Joined 1/7/2024)
Cllr. Peter Bloomfield   Moray Council
Cllr. Scott Lawrence    Moray Council 
Cllr Ben Williams    Moray Council
Non-Voting Members
Simon Bokor-Ingram   Chief Officer (left 31/5/2024)
Judith Proctor    Chief Officer (Joined 15/7/2024)
Jim Lyon Interim Chief Social Work Officer (Joined
3/6/2024)
Tracey Stephen Chief Social Work Officer (left 17/6/2024)
Jane Ewen     Lead Nurse
Professor Duff Bruce   Non Primary Medical Service Lead
Dr Robert Lockhart    GP Lead
Dr Malcolm Simmons   GP Lead (left 31/3/2025)
Janette Topp Third Sector Stakeholder (19/4/2024 –
11/2/2025)
Sheila Brumby Service User Rep. (Joined 19/4/2024)
Ivan Augustus    Carer Representative
Kevin Todd  Moray Council Staff Representative 
Elizabeth Robinson    Public Health Representative
Deirdre McIntyre                Grampian Health Board Staff Partnership
Page 213

Page 214

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 2 
MORAY INTEGRATION JOINT BOARD MEMBERS 2024/25 Continued 
Co-opted Members
Sean Coady     Head of Service and Deputy Chief Officer
Deborah O’Shea Chief Finance Officer 
Adam Coldwells Interim Chief Executive Grampian Health
Board 
Roddy Burns Chief Executive, Moray Council (retired
31/5/2024)
John Mundell  Interim Chief Executive, Moray Council
(2/4/2024 – 14/3/2025)
Karen Greaves Chief Executive, Moray Council (Joined
17/3/2025)
Sonya Duncan    Interim Corporate Manager
. 
MANAGEMENT COMMENTARY 
The Role and Remit of the Moray Integration Joint Board 
The Public Bodies (Joint Working) (Scotland) Act 2014 required that Moray Council
and Grampian Health Board prepared an Integration Scheme for the area of the local
authority detailing the governance arrangements for the integration of health and
social care services. This legislation resulted in the establishment of the Moray
Integration Joint Board (MIJB) that became operational from 1 April 2016. Moray
Council and Grampian Health Board, as the parties to the Integration Scheme, each
nominate voting members to the MIJB, currently, four elected members from Moray
Council and four Grampian Health Board members.   
Under the Public Bodies (Joint Working) (Scotland) Act 2014, a range of health and
social care functions have been delegated from Moray Council and Grampian Health
Board to the MIJB who has assumed responsibility for the planning and operational
oversight of delivery of integrated services.  MIJB also has a role to play in the strategic
planning of unscheduled acute hospital based services provided by Grampian Health
Board as part of the ‘set aside’ arrangements. 
Hosted services also form part of the MIJB budget. There are a number of services
which are hosted by one of the three IJB’s within Grampian Health Board area on
behalf of all the IJBs. Responsibilities include the planning and operational oversight
of delivery of services managed by one IJB on a day to day basis. MIJB has
responsibility for hosting services relating to Primary Care Contracts and the Grampian
Medical Emergency Department (GMED) Primary Care Out of Hours service.
Page 214

Page 215

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 3 
MANAGEMENT COMMENTARY (continued) 
Key Purpose and Strategy 
Following review and consultation, the refreshed Strategic Plan (2022-2032) is a
continuation of the 2019 Strategic Plan. The current plan emphasises the strength of
integration and in addition to our two main Partners – Moray Council and Grampian
Health Board - the MIJB recognises the importance of the Third and Independent
Sectors and Unpaid Carers, in facilitating the successful operation of the partnership
of Health & Social Care Moray. As with all health and social care systems Moray is
facing increasing demand for services at the same time as resources – both funding
and workforce availability - are under pressure. These challenges will intensify in the
coming years as our population ages and more people with increasing complex needs
require support to meet their health and care needs. The MIJB sets the direction and
strategic intent through the development and implementation of the Strategic Plan and
seeks assurance on the management and delivery of services through Board level
performance reporting which ensures an appropriate level of scrutiny and challenge. 
The Strategic Plan identifies priority areas to support strategic direction and vision.   
STRATEGIC PLAN KEY THEMES 
MANAGEMENT COMMENTARY (continued) 
BUILDING RESILIENCE – Taking greater responsibility for our health
and wellbeing
HOME FIRST – Being supported at home or in a homely setting as far
as possible
PARTNERS IN CARE – Supporting citizens to make choices and take
control of their care and support
WE ARE PARTNERS IN CARE
OUR VISION: “We come
together as equal and valued
partners in care to achieve the
best health and wellbeing
possible for everyone in Moray
throughout their lives.”
OUR VALUES: Dignity and
respect; person-led; care and
compassion; safe, effective and
responsive
OUTCOMES: Lives are healthier – People live more independently –
Experiences of services are positive – Quality of life is
maintained/improved – Health inequalities are reduced – Carers are
supported – People are safe – The workforce continually improves –
Resources are used effectively and efficiently
Page 215

Page 216

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 4 
The Plan purposefully places an emphasis on prevention and early intervention
activities and seeks to prioritise these activities as a long term goal, actively pursuing
good health and wellbeing for the population, with increased investment in this area of
work.  It highlights the Home First approach and the rationale for this is to assist people
in understanding that “hospital is not always the best place for people”, a statement
frequently used and in particular if you are frail and elderly can be counter intuitive to
a successful recovery.     
Initiatives to transform services in response to high levels of demand continue. The
Moray Strategic Plan was refreshed in 2022 and along with the associated delivery
plan, which was updated in May 2025, highlights key priorities for transformation. 
Population 
Moray is a largely rural area covering a land mass of 2,238 sq. km. It has a long
coastline on the Moray Firth with harbours, fishing villages and world-class
beaches.  From the 2022 census, the area’s population is 93,4001, which is an
increase of 0.1% since 2011. The population growth in Moray is slowing and it is
projected that the population in Moray will start to decline by 2030. This trend is
forecast to continue. 
The main centre of population is Elgin, which is home to more than one quarter of the
people living in Moray. Other towns of population between 4,000 and 10,000 are
Forres, Buckie, Lossiemouth and Keith. 
The table below sets out projected population growth based on the 2022 baseline,
which has not changed from the 2018 publication. Across Scotland there is a projected
reduction in those in the 0-15 age group, limited change in the working age population,
but significant growth in adults of pensionable age. By comparison it is projected that
Moray will have a greater decrease in children, a marked decrease in those of a
working age, but a significantly higher change in those of a pensionable age2. 
MANAGEMENT COMMENTARY (continued) 
1 Scotland's Census 2022 - Rounded population estimates - data | Scotland's Census
2 Population Projections for Scottish Areas 2018-based - National Records of Scotland (NRS)
-22.2%
-9.0%
30.8%
-10.5%
-0.2%
23.2%
-30.0%
-20.0%
-10.0%
0.0%
10.0%
20.0%
30.0%
40.0%
Children (0-15) Working Age Pensionable age
and overProjected change (%)
Age Group
Projected percentage change in population (2018-
2043) by age
Moray
Scotland
Page 216

Page 217

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 5 
Performance Reporting 
Performance is reported quarterly to the Audit, Performance and Risk Committee of
the MIJB. In addition to the quarterly reporting, there is a requirement under the Public
Sector (Joint Working) (Scotland) Act 2014 for the MIJB to produce and publish an
Annual Performance Report setting out an assessment of performance in planning
and carrying out the delegated functions for which they are responsible. The Annual
Performance Report is due to be published by 31 July this year and will be published
on the Health & Social Care Moray website, once approved by the MIJB.   
One of the major aims of integration and a key measurable target for MIJB is to reduce
the number of Moray residents that are ready to be sent home from hospital but have
been delayed in this process. This is referred to as a ‘delayed discharge’. Delayed
discharge can occur due to many reasons but quite often involves the onward
provision of social care which can be complex in nature and/or finite in its availability.
Figures 1 and 2, below, notes Moray’s performance over a six-year period showing
the number of delayed discharge bed days occupied varying significantly and with
minimal seasonal pattern up to March 2025. 
Delayed discharges reduced during the COVID pandemic and the lock down periods,
as people stayed in their own homes as per advice at the time and there was more
availability of family members to support care needs. Notably, delayed discharges
began to rise in Moray and across the country in March 2022 and work commenced
across the three partnerships in Grampian to address the issue. Results in this activity
can be seen from March 2023 onwards. However, winter 2023 saw delayed
discharges increasing, in Moray and across the country and continues at an increased
level. 
Figure 1 
MANAGEMENT COMMENTARY (continued) 
Page 217

Page 218

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 6 
Figure 2 
There continues to be a focus on ensuring people are getting home quickly and can
maintain their independence. In figures 3 and 4, below, the rate of emergency
occupied bed days for over 65 years of age per 1000 population has increased since
2021/22 with a slow decrease since March 2023. 
With an ageing population the number of people delayed at any one time could
increase again unless viable, sustainable alternative community provision is
developed. Presentations to hospital from an older population have more acuity and
complexity, exacerbating the issue of delays. The Scottish Government have now set
targets for delayed discharges per 100,000 and for Moray the target is 26.  This
presents a challenge, but efforts continue to review and streamline processes and
improve flow across the system. 
The importance of integration across the system is key to making progress, and over
the year teams have enhanced communication and decision making as a Moray
system. There has been further redesign of pathways and dedicated resource
assigned to supporting critical decision making in social care. This has all supported
the steady progress that is evident from the national comparisons of Moray’s
performance. 
0
200
400
600
800
1000
1200
1400
1600
Jun Sep Dec Mar
Number of bed days occupied by delayed discharges
18+ at census date
2020/21 2021/22 2022/23 2023/24 2024/25
Page 218

Page 219

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 7 
MANAGEMENT COMMENTARY (continued) 
Figure 3
The figures for 2019/20 and 2020/21 have been restated as these figures are subject
to change as more patients are discharged from hospital and when there is a annual
mid year population estimate. The figures now included are accurate and in line with
reports elsewhere. 
Figure 4 
1500
1700
1900
2100
2300
2500
2700
2900
Jun Sep Dec Mar
Rate of Emergency Occupied Bed Days for over 65s per
1000 population
2020/21 2021/22 2022/23 2023/24 2024/25
Page 219

Page 220

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 8 
MANAGEMENT COMMENTARY (continued) 
Moray Integration Joint Board (MIJB) 
The MIJB has scrutinised and directed the delivery of services in line with the
Integration Scheme and Strategic Plan while recognising that the cost base has to
change as the level of available budget in real terms is reducing. Both funding
partners (Moray Council and NHS Grampian) have significant savings to achieve,
and against this backdrop the MIJB directed a series of workshops during the year to
support officers in their work. The focus has continued to be on achieving the highest
quality and safety possible within a diminished budget, while being most efficient,
and achieving the best possible outcomes for our residents. The Strategic Plan
aspires to increasing spend on preventative work, “upstream” to tackle issues earlier,
preventing crises where possible and reducing demand. However, a key challenge
going forwards will be to continue that focus at a time when budgets are under so
much pressure and people are presenting with increasingly complex needs. 
Performance
The MIJB, its committees and the Health and Social Care Partnership Senior
Management Team receive regular assurance reports and updates on how the
Strategic Plan commitments are being progressed through work streams and
individual service plans, as well as detailed financial and performance updates. 
The strategic risk register was reviewed by the Moray Integration Joint Board and
Senior Management Team. It was approved in May 2025 and will form part of a
robust risk monitoring framework in order to identify, assess and prioritise risks
related to the delivery of services, particularly any which are likely to affect the
delivery of the Strategic Plan. 
The inherent risks being faced by the MIJB, together with a current assessment on
the level of the risks and mitigating actions being taken to reduce the impact of the
risks, is reported to biannually to the Audit Performance and Risk Committee for
oversight and assurance.   
Management teams and the Care and Clinical Governance Group review and
respond to any reports produced by Audit Scotland, Healthcare Improvement
Scotland, the Care Inspectorate, and the Mental Welfare Commission for Scotland. 
Quarterly performance reports are produced for Health and Social Care Moray
(HSCM) management to review performance and to determine actions required to
address areas for concern or to highlight areas showing improvement.  This
information is further scrutinised by the Senior Management team and then reported
to the MIJB’s Audit, Performance and Risk Committee. 
There are many initiatives and ongoing projects being undertaken by HSCM that are
seeking to reduce the delays in hospitals and to meet unmet needs. For example,
ensuring the provision of care at home is maximised within available budget is a key
aspect of the Strategic Care at Home workstream.  
Page 220

Page 221

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 9 
MANAGEMENT COMMENTARY (continued) 
Research into the type of equipment, benefits and impacts is being undertaken by the
Digital Health Institute as part of the Growth Deal which will inform our Technology
Enabled Care and Digital strategy which will provide other options for supporting
people to live independently in their own homes.  The collaborative initiative Discharge
Without Delays being undertaken by partners across NHS Grampian, is aiming to
reduce delays currently experienced by people who are medically fit to return home
and is being facilitated by Health Intelligence Scotland.  Whole system outcomes have
been determined which will be incorporated into the revised performance report to this
committee for 2025/26. 
The integration of Children & families and Justice services into Health & Social Care
Moray under the direction of the MIJB is not yet reflected in the Board’s Strategic
Plan. Work in ongoing to ensure appropriate governance of performance reporting
so that it can be included in future MIJB Annual Performance Reports. 
Strategy and Plans
The MIJB is required to review its Strategic Plan every three years as per the
legislation. The Strategic Plan 2022-2032 places an emphasis on prevention and
early intervention with the aim of building resilience for individuals and communities.
The Plan identified key aims of the MIJB and directed HSCM to work closely with
communities and key partners to reform the system of health and social care in
Moray. It was also recognised that progress has been made against the three
strategic themes and the review of the Plan focused on what already has been
achieved the long-term strategic objectives make room for adapting to challenges
and developments in health and social care over the coming years. 
The current Strategic Plan  sets out the 3 key themes and the objectives; 
• Building Resilience – supporting people to take greater responsibility for
their health and wellbeing.
• Home First – supporting people at home or in a homely setting as far as
possible. 
• Partners in Care – supporting citizens to make choices and take control of
their care and support. 
Page 221

Page 222

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 10 
MANAGEMENT COMMENTARY (continued) 
Staff Wellbeing 
Health & Social Care Moray’s Health Improvement Team has achieved the Paths for
All Walk at Work Award for its innovative efforts to promote physical activity in the
workplace and encourage colleagues to boost their health and wellbeing through
daily walking. 
Morgan McKay, Health Walk Coordinator, led the team in developing initiatives to get
colleagues moving more. She carried out a travel survey to identify how staff travel
to and from work and used the data to develop a plan to increase workplace activity. 
The team mapped convenient walking routes from two key work locations in Elgin –
the Moray Council Annexe and Dr Gray's Hospital – offering both 30-minute and 15-
minute options. To encourage staff to keep walking no matter the weather, Morgan
arranged for umbrellas to be available for borrowing and designated areas for drying
wet outdoor gear. 
Staff engagement was further boosted through
participation in the Paths for All step count challenge, a
twice-yearly walking initiative that connects Scottish
workplaces in friendly competition. 
The Walk Moray project supports a network of trained
volunteers to deliver a variety of weekly low-level,
accessible and friendly health walks in communities across
Moray which are a great way to increase your activity
levels. 
Promoting Health and Wellbeing 
Health & Social Care Moray (HSCM) teamed up with community partners to highlight
the importance of eating well and staying hydrated during Nutrition and Hydration
Week. The national campaign aims to highlight how proper food and drink intake plays
a vital role in overall health, particularly for people in care settings such as hospitals
and care homes. Malnutrition and dehydration are often overlooked but can have
serious consequences, leading to hospital admissions, longer hospital stays, delayed
recovery, and a decline in overall wellbeing. 
HSCM is tackling this issue head-on with an exciting lineup of activities designed to
educate, engage, and inspire action by colleagues and the wider public. Throughout
the week, HSCM’s Health Improvement Team has been helping local partners host a
variety of activities including information stands; launch of new food and drink
initiatives; daily themed food days; poster displays; themed drinks trollies; and tea
parties. 
Page 222

Page 223

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 11 
MANAGEMENT COMMENTARY (continued) 
Service Delivery/Business as Usual
HSCM continues to invest in the delivery of high-quality services through
commissioning activity across mental health, advocacy, and primary care.
Following a competitive procurement process, Scottish mental health charity SAMH
(Scottish Action for Mental Health) has been awarded contracts to deliver adult
mental health community support services in Moray until 2029. SAMH will provide
two key services: an intensive recovery service for individuals with higher-level
mental health needs, and a new community support service, which includes delivery
of the Distress Brief Intervention (DBI) programme.
The intensive recovery service will continue to support people receiving care from
hospital or community mental health teams, offering enhanced, community-based
outreach to promote recovery and independent living. The new community support
service will provide short-term, practical assistance to help individuals access
appropriate support and tackle factors affecting their mental wellbeing. DBI will offer
a rapid response to individuals in emotional distress, particularly those presenting to
emergency or crisis services.
As part of ongoing efforts to support people to have their voices heard, HSCM has
commissioned VoiceAbility as its new independent advocacy service provider.
Launched in October 2024, this free and confidential service is available to adults
accessing social care services in Moray, including those with mental health
conditions, learning disabilities, autism, dementia, physical and sensory disabilities,
as well as unpaid carers. VoiceAbility's trained advocates support individuals to
understand their rights, express their views, and take an active role in decisions
affecting their health and wellbeing. 
A new contract has also been awarded to secure the future of GP services in
Aberlour Medical Practice, with Speyside Medical Group appointed as the new
provider from April 2025. The experienced partnership of eight GPs currently
operates Grantown-on-Spey and Glenlivet Medical Practices and will bring its
expertise to serve the 3,000 patients in Aberlour. The practice had been under
interim management by HSCM and NHS Grampian since February 2024, following
the withdrawal of the previous sole GP contractor. 
Page 223

Page 224

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 12 
MANAGEMENT COMMENTARY (continued) 
The aim of a Community Appointment Day (CAD) is to create the right conditions to
allow clinicians to support people with their condition and beyond, lean into the local
community services, embed personalised care and focus on prevention.  With the
intention of addressing increasing waiting lists by trialling a new model of care, NHS
Grampian delivered their first CAD in Moray for MSK Physiotherapy and Podiatry
patients. This was a new way of working, moving away from treatment led health and
delivering services differently by strengthening local partnerships, particularly with
communities, to enhance both patient and practitioner experience.  There were 210
patients on the waiting list who were all invited, with 162 opted to attend and 120
attending on the day. Patients were linked their own online Personal Health
Passport, which was completed by them as they moved around the zones. Patients
received a one-to-one consultation with the appropriate clinician and were
encouraged to have meaningful conversations about what matters most to them.   
The CAD followed Realistic medicine principles,
focusing on personalised and values-based
care.  The voice of lived experience was heard
throughout the planning process by involving the
local Versus Arthritis Chronic Pain Group who
offered valuable feedback and guidance.   
19 community groups and partner services were in
attendance to provide information about the support
available within the local community.  Bringing
health and community organisations together under
one roof, allowed people’s health and wellbeing to
be viewed in full totality. 
Preliminary Feedback was largely positive, indicating that patients felt the day had
been ‘enlightening’, benefited greatly from having services available in one place and
found out about what is available in communities.  
Page 224

Page 225

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 13 
MANAGEMENT COMMENTARY (continued) 
Longer Term Changes to Strategies and Plans
Moray Community Justice Partnership
The Moray Community Justice Partnership has formally launched its new
improvement plan, which will bring together local agencies and communities to
strengthen efforts to make Moray a safer place to live and
work. 
The five-year plan focuses on rehabilitation and public safety.
It builds on existing work to reduce reoffending and minimise
the number of victims by offering individuals who have
offended support to make positive life changes. 
The local priorities for improving justice outcomes were
identified through engagement with community justice
stakeholders and residents, and a strategic assessment of
Moray's strengths and needs. 
By 2029, the Moray Community Justice Partnership aims to: 
• Strengthen engagement with communities to reduce stigma, increase
understanding and support for community justice, and embed lived
experience within its work;
• Improve access to support for individuals leaving prison to aid reintegration;
• Expand access to employability skills and employment opportunities for those
with convictions;
• Enhance support for individuals in police custody;
• Develop more community-based restorative justice options.
Significant progress in reducing drug and alcohol-related harms and improving lives
across communities has been achieved through the work of the Moray Alcohol and
Drug Partnership (ADP). 
Moray ADP has made notable progress in implementing the national Medication
Assisted Treatment (MAT) standards, which are a key part of Scotland’s response to
the ongoing drug related deaths crisis. The standards provide a framework ensuring
treatment is safe, person-centred and effective. 
Improved referral pathways, delivered through a third sector direct access service,
have reduced waiting times for people and enabled faster access to support.
Feedback from lived experience groups has shaped pathways into and through 
Page 225

Page 226

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 14 
MANAGEMENT COMMENTARY (continued) 
services to better reflect the realities of people’s lives, leading to improved outcomes,
while frontline staff have benefitted from continued training on rights awareness,
trauma informed practice and crisis response.
Strategic Delivery Plan
A revised Strategic Delivery Plan for 2025 to 2028 was approved in draft by MIJB in
March 2025 and final version in May 2025.  This plan incorporates the developments
required to enhance our ability to meet predicted future demands for services, whilst
undertaking reviews of existing models of care to ensure that the services provided
are sustainable and fit for purpose.  There are also projects to implement more efficient
ways of working, to aid in meeting the financial challenge that is impacting on all public
sector organisations.  A robust governance framework will be essential to ensure that
projects can be delivered within available resources and have a clear focus on
outcomes
Joint Inspection
Moray's multi-agency Public Protection Partnership
has evidenced substantial improvement in
supporting and protecting adults at risk of harm   
The positive impact achieved by local authority,
health and police colleagues in their work to keep
people safe, has been acknowledged with publication in October 2024 of the Joint
Inspection of Adult Support and Protection in Moray. The progress review by the
Care Inspectorate and its scrutiny partners was a follow-up to a joint inspection
carried out in 2022. On their return, inspectors found significant progress had been
achieved across all seven priority areas identified for improvement. 
Mental Health Strategic Delivery Plan
The Moray Mental Health and Wellbeing Delivery Plan 2024-2026 was approved by
the MIJB in September 2024 and was updated in May 2025, which underpins the
work required to progress the Moray Mental Health and Wellbeing Strategy 2016-
2026. Scotland is currently facing a growing mental health crisis, with challenges
including rising demand for services, increased complexity of cases, and persistent
inequalities in access and support. While there is a focus on developing and
expanding services, significant workforce challenges, and funding shortfalls continue
to hinder progress. Many of these challenges are amplified in Moray due to the rural
nature of many of our communities, difficulties in the recruitment and retention of
staff, and access to specialist tertiary services. 
Page 226

Page 227

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 15 
MANAGEMENT COMMENTARY (continued) 
The Moray Adult Mental Health and Wellbeing Strategic group aim to ensure that the
collective voice of lived and living experience influences the way that we design
services and responses to address the challenges facing individuals and families
affected by mental health in Moray. The group work closely with Moray Wellbeing
Hub, Making Recovery Real Partnership and tsiMoray to achieve this; for example,
the involvement of lived experience in service development, commissioning,
implementation and evaluation of the recently commissioned SAMH projects. 
The alignment of Children’s Services and Adults Services mental health strategic
planning and delivery is essential. Within Moray there is currently a Children’s Mental
Health and Wellbeing Partnership and there is the Moray Mental Health and
Wellbeing Strategic Group. There is a degree of cross representation between both
groups to ensure shared planning however, there remains the medium term vision
for there to be a single strategic group for children and adult mental health services
in Moray. 
Financial Review and Performance 
Financial performance forms part of the regular reporting cycle to the MIJB. 
Throughout the year the Board, through the reports it receives, is asked to consider
the financial position at a given point and any management action deemed as
necessary to ensure delivery of services within the designated financial framework. 
From the first quarter in the financial year, the Board was presented with financial
information that included a forecast position to the end of the year. In November 2024
the Board received a financial report which forecast an expected overspend to the end
of the financial year of £5.58m. This forecast remained consistent throughout the
remainder of the year and in January 2025, MIJB were forecasting an overspend to
the end of the year of £5.51m, the MIJB actually out turned at £4.26m overspent. Both
partners in line with the Integration Scheme, put in additional funding to cover this
overspend, so with the use of ear marked reserves totalling £0.536m, this leaves a
balance of £1.45m in ear marked reserves to be carried forward into 2025/26. In May
2024, the MIJB agreed a savings plan of £8.297m, with a mixture of recurring savings
and recurring reductions in spend.  At the end of the financial year, this had been
achieved in part, with recurring savings of £2.302m and £2.331m reduction in
overspend. 
Given the uncertainties associated with funding and the emerging overspend position
at the early stage of the financial year, it was necessary to update the Board regularly
on the emerging financial position. This was done formally through MIJB meetings and
informally through development sessions. 
Page 227

Page 228

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 16 
MANAGEMENT COMMENTARY (continued) 
Service Area Budget
£000’s
Actual
£000’s
Variance
(Over)/ under
spend £000’s
Note
Community Hospitals & Services 7,701 8,329 (628) 
Community Nursing104,360 5,979 6,166 (187) 
Learning Disabilities 17,702 19,975 (2,273) 1
Mental Health 12,140 12,055 85 
Addictions 1,907 1,763 144 
Adult Protection & Health Improvement 249 273 (24) 
Care Services Provided In-House 24,743 22,754 1,989 2
Older People Services & Physical &
Sensory Disability 24,775 27,034 (2,259) 3
Intermediate Care & OT 1,771 1,972 (201) 
Care Services Provided by External
Contractors 1,836 1,817 19 
Other Community Services 10,383 10,280 103 
Administration & Management 3,333 3,152 181 
Other Operational Services 1,377 1,535 (158) 
Primary Care Prescribing 18,748 21,937 (3,189) 4
Primary Care Services 21,427 21,331 96 
Hosted Services 5,713 5,665 48 
Out of Area Placements 720 1,971 (1,251) 5
Improvement Grants 1,207 1,021 186 
Children’s & Justice Services 19,524 19,626 (102) 
Total Core Services 181,235 188,656 (7,421) 
Strategic Funds & Other Resources 14,891 6,020 8,871 6
TOTALS (before set aside) 196,126 194,676 1,450 
Set Aside 15,639 15,639 - 
TOTAL 211,765 210,315 1,450 
The table above summarises the financial performance of the MIJB by comparing
budget against actual performance for the year.  
Page 228

Page 229

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 17 
MANAGEMENT COMMENTARY (continued) 
Significant variances against the budget were notably: 
Note 1 Learning Disabilities (LD) – The LD service is overspent by £2,272,694 at
the year-end. The overspend is essentially due to the purchase of care for people with
complex needs which resulted in an overspend of £2,806,801 and client transport of
£13,781. This is offset by more income received than expected of £524,800 (income
due from another authority and Change Fund funds from NHS) and other small
underspends of £18,619 which primarily relate to property costs. There was a minor
underspend of £4,469 in other Learning Disabilities clinical services. This budget has
been under pressure for a number of years due to demographic pressures, transitions
from Children’s services and people living longer and getting frailer whilst staying at
home. The biggest overspends was for services provided to individuals in their own
homes to support their daily living needs which enables people to stay living at home
or in a homely setting for as long as possible and day care which provides activities
during the day in the community. 
Note 2 Care Services Provided In-House – This budget is underspent by £1,988,757
at the end of the year. This relates to underspend in staffing across all the services in
this budget totalling £2,291,755 and other minor underspends of £8,275 which is being
reduced by overspends relating to transport costs £97,970; insurance costs £29,047,
utility costs £62,430 and less income than expected £121,826. Unfilled vacancies have
been the main reason for the underspend throughout the year, and the issue of
recruitment has been an ongoing problem. 
Note 3 Older People Services and Physical & Sensory Disability - This budget is
overspent by £2,259,056 at the end of the year. This primarily relates to overspends
for home care in the area teams £539,818, permanent care £1,766,157 due to the
increase in the number of clients receiving nursing care rather than residential care
and respite care £105,776 this is being reduced by an underspend for day care
£152,695. The variances within this overall budget heading reflect the shift in the
balance of care to enable people to remain in their homes for longer. The ageing
population requiring more complex care and local demographics also contributes to
this overspend as well as the correlation between the recruitment and retention of the
internal home care service provision. 
Note 4 Primary Care Prescribing - The primary care prescribing budget is reporting
an over spend of £3,189,386 for the twelve months to 31 March 2025. The overall
average price has remained relatively consistent and includes cost reduction savings
identified by Pharmacy implemented countered by the impact of short supply causing
an increase in costs. This is spread across a range of products and is ongoing. This
overall volume increase at 3.5% is less than previously anticipated. 
Note 5 Out of Area Placements – This budget is overspent by £1,250,899 at the year
end. This is due to the continuing number of high cost individual specialised NHS
placements. 
Page 229

Page 230

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 18 
MANAGEMENT COMMENTARY (continued) 
Note 6 Strategic Funds and Other Resources – This budget is underspent by
£8,871,064 as it relates to savings achieved during the year, any unallocated funding
and reserves balances. 
MIJB’s financial performance is presented in the comprehensive income and
expenditure statement (CIES), which can be seen on page 44.  At 31 March 2025
there were ear marked reserves of £1.45m available to the MIJB, compared to
£1.986m at 31 March 2024. These remaining reserves of £1.45m are for various
purposes as described below: 
Earmarked Reserves Amount £000’s
GP Premises 39
National Drugs MAT 250
OOH Winter Pressure funding 172
Moray Cervical screening 35
Moray hospital at home 5
Moray Psychological 315
MHO Funding 138
Adult protection funding for CA 18
Adult Disability payment 45
National Trauma Training services 62
Moray School Nurse 32
Moray Winter Fund HCSW & MDT 182
LD Annual Health Checks 69
Community Planning partnership 2
Moray District Nurses 56
OOH Dev Fellowship scheme 30
Total Earmarked 1,450  
General Reserves 0  
TOTAL Earmarked & General  1,450 
Page 230

Page 231

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 19 
MANAGEMENT COMMENTARY (continued) 
GP Premises – balance of funding for improvement grants including the making of
premises improvement grants to GP contractors. The continued digitalisation of paper
GP records. Modifications for the purposes of improving ventilation and increase to
the space available in NHS owned or leased premises for primary care multi-
disciplinary teams. 
National Drugs Medication Assisted Treatment (MAT) for embedding and
implementation of the standards will he be overseen by the MAT implementation
support team (MIST). 
National Drugs Mission Moray – balance of funding for range of activities including:
drug deaths, taskforce funding, priorities of national mission, residential rehabilitation,
whole family approach, outreach, bear fatal overdose pathways and lived and living
experience. 
Out of Hours Winter Pressure funding – balance of funding to sustain GO out of hours
and to support resilience to explore operational solutions. 
Moray Cervical Screening – balance of funding for smear test catch up campaign. 
Moray Hospital at home – development of Hospital at Home provides Acute hospital
level care delivered by healthcare professionals, in a home context for a condition that
would otherwise require acute hospital inpatient care. 
Moray Psychological – funding streams for mental health, psychological wellbeing,
facilities, post diagnostic support and psychological therapies. 
Mental Health Officer (MHO) funding – funding to support additional mental health
officer capacity. 
Adult protection funding for care at home– balance of funding to build capacity in care
at home community based services. 
Adult Disability payment – funding to assist with the implementation of the adult
disability payments. 
National Trauma Training services – training for dealing with people affected by
trauma and adversity. 
Moray School nurse – funding to support NHS Grampian to retain school nurse posts. 
Moray Winter Fund Health Care Social Workers (HCSW) – additional funding for
further HCSW in both the IJB and Emergency department. 
Moray Winter fund Multi Disciplinary Team – additional funding for service pressures
includes Discharge to Assess, Home First Frailty team and volunteer development.   
Page 231

Page 232

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 20 
MANAGEMENT COMMENTARY (continued) 
Learning Disability Annual Health Checks – to implement the annual health checks. 
Community Planning Partnership – funding towards community planning partnership. 
Moray District Nurses – allocation to support recruitment and training of District Nurses 
Out of Hours (OOH) Development Fellowship Scheme – scheme to keep GPs within
clinical practice, increase GP’s confidence and competence in OOHs work. 
All reserves are expected to be utilised for their intended purpose during 2025/26. 
Set Aside – Excluded from the financial performance table above on page 16 but
included within the Comprehensive Income & Expenditure Account is £15.639m for
Set Aside services.  Set Aside is an amount representing resource consumption for
large hospital services that are managed on a day to day basis by the NHS
Grampian.  MIJB has a responsibility for the strategic planning of these services in
partnership with the Acute Sector.
Set Aside services include:
• Accident and emergency services at Aberdeen Royal Infirmary and Dr Gray’s
inpatient and outpatient departments;
• Inpatient hospital services relating to general medicine, geriatric medicine,
rehabilitation medicine, respiratory medicine, learning disabilities, old age
psychiatry and general psychiatry; and
• Palliative care services provided at Roxburgh House Aberdeen and The Oaks
Elgin. 
The budget allocated to Moray is designed to represent the consumption of these
services by the Moray population. 
The figures for 2024/25 have been derived by uplifting 2019/20 figures by baseline
funding uplift in 2020/21 (3.00%), 2021/22 (3.36%) ,2022/23 (6.70%), and 2023/24
(5.35%) and 2024/25 (6.64%): 
2024/25 2023/24 2022/23 2021/22 2020/21
Budget 15.639m 14.665m 13.92m 13.04m 12.62m 
Page 232

Page 233

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 21 
MANAGEMENT COMMENTARY (continued) 
Risks, Uncertainties and Future Developments
The MIJB Chief Officer has a responsibility to maintain a risk strategy and risk reporting
framework.  Risks inherent within the MIJB are monitored, managed and reported at
Audit, Performance and Risk Committee.  In addition, a risk action log is monitored
and managed by the Senior Management Team.   
The key strategic risks of the MIJB classed as ‘High’ and ‘Very High’ are presented
below, the risk number relates to the MIJB internal risk numbering: 
VERY HIGH
Risk 2 - The MIJB must operate within the resources allocated to it by the partner
bodies and it is good financial practice to set a balanced budget at the start of each
financial year. There is a risk that financial pressures being experienced by the
funding partners will directly impact the MIJB’s strategic planning of services and its
decision-making. 
Managing the risk – current controls in place – 
1. Medium Term Financial Framework (MTFF) approved by MIJB on 27 March
2025.
2. Additional resource to support services a Programme Management Office
agreed until September 2025.
3. Tri-partite partnership performance meetings with partner CEOs, Finance
Directors and Chair/Vice Chair of MIJB.
4. Operational financial monitoring undertaken by Chief Finance Officer
(CFO), Heads of Service (HOS) and Budget Managers.
5. Budget Savings Oversight Group chaired by Chief Officer, attended by
HOS, CFO and Service Managers as appropriate.
6. Review of MIJB Strategic Delivery Plan ensuring all projects are aligned with
savings plans. 
Assurances: 
Quarterly Budget monitoring reporting to APR and MIJB.
Financial Reporting through MIJB, NHS Grampian and Moray Council.
The Project Management Office will support the Financial Recovery Savings
presented as part of the budget setting for 2025/26.
Financial Development Sessions with MIJB members.
Internal Audit quarterly reporting to APR. 
External Audits presented to MIJB/ Committees as appropriate.
Six weekly Tri-partite partnership performance meetings with partner CEOs,
Finance Directors and regular meetings with the Chair/Vice Chair of MIJB. 
Page 233

Page 234

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 22 
MANAGEMENT COMMENTARY (continued) 
HIGH
Risk 3 - There is a risk that the MIJB’s workforce strategy is not delivered impacting
the quality of paid and unpaid Health & Social Care. 
Managing the risk – Current controls in place   
1. Management structure currently under review.
2. Moray Council are aware of the housing issues and are conducting an
assessment of needs, including people working in the Health and Care sector.
3. Staff wellbeing is a key focus and there are many initiatives across both parent
organisations offering information, support and access to activities.
4. Collaborative approaches with educational institutions e.g. intakes and
programmes for future workforce development.
5. Professional Development and retention programmes; Incentives have been
secured to attract additional NHS dentists and dental practices to Moray. The
Scottish Dental Access Initiative includes Moray, with grants of £50,000 and
above available to allow dental practices to be established or extended–
provided there is a seven-year commitment to providing NHS treatment. A
recruitment and retention bonus is also being offered to eligible new dentists in
Moray
6. GP sustainability Group and Primary Care Vison for the Future Groups now
progressing across Grampian.
7. iMatter reports are used to develop actions plans for teams.
Assurances:
Operational oversight by Moray Workforce Forum.
The HSCM Response Group continues to focus on leadership around emerging
issues and resolving them, including staffing. 
Risk  5 - There is a risk that the MIJB does not comply with the necessary legislative
and regulatory requirements in which it operates. 
Managing the risk – Current controls in place: 
1. NHS Grampian Resilience Standards Action Plan approved (3 year). New
standards are being drafted by Scottish Government, and these are expected
in 2025 and will replace the current standards.
2. Continuous emergency preparedness awareness with partners under GLRP
– including exercises and debriefs.
3. Learning from Inspection Reports, Adverse Events, Complaints – action
plans and performance measures monitored by OMT with oversight by SMT.
4. HSCM Civil Contingencies group review specific risks and action plans to
mitigate, developing plans and testing arrangements in partnership with
NHSG and Council.
5. Annual review of internal resilience and emergency processes with Senior
Managers on Call.
Page 234

Page 235

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 23 
MANAGEMENT COMMENTARY (continued) 
HIGH (continued)
Assurances:
Quarterly reporting to Clinical and Care Governance and Audit, Performance and
Risk Committees.
Annual Performance Report – published September 2024.
Chief Social Work Officers Report.
Internal and External Audits.
Senior Management Meetings fortnightly.
Joint meeting of MIJB Chief Officer with two Partner Body Chief Executives.
Annual report on MIJB activity developed and reported to Moray Council and
NHSG 
Risk 6 - There is a risk that the MIJB’s strategic aspirations are not transformative
and as a result, we are unable to deliver outcomes for people in a sustainable way. 
Managing the risk – Current controls in place: 
1. Clinical and Care Governance (CCG) Committee. Clinical Risk Management and
Practice Governance group has oversight of their respective professional
standards and links into Clinical and Care Governance Group, which escalates
to CCG Committee as necessary.
2. High and Very High operational health service risks are reviewed by HSCM
Clinical Risk Management (CRM) Group and also NHS Grampian CRM Group.
3. Annual Performance Reports.
4. Internal and External Audit.
5. Internal/External Inspection reports are scrutinised by appropriate operational
groups and by exception to SLT for subsequent reporting to CCG or APR
Committee as appropriate. 
6. Care Home Collaborative Support Group meets to oversee and manage risks in
care homes.
7. Children and Adult Protection services report to their respective committees.
Governance Structure and Process (Senior Leadership Team meetings,
Operational Team Meetings, Daily Huddles). 
Assurances:
Audit, Performance and Risk and Clinical and Care Governance Sub-Committees
oversight and scrutiny.
The Clinical and Care Governance Framework was refreshed and presented to
CCG Committee in November 2023 
Page 235

Page 236

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 24 
MANAGEMENT COMMENTARY (continued) 
HIGH (continued) 
Risk 7 - There is a risk that the MIJB is unable to exert influence on services
delegated but hosted within another organisation. 
Managing the risk – Current controls in place: 
1. Chief Officer regularly meets with Chief Officers of Aberdeen City Health and
Social Care Partnership and Aberdeenshire Health and Social Care
Partnership.
2. Significant changes to service delivery are discussed across all three HSCP’s.
3. Agreement that proposals regard significant service changes are presented to
all three MIJB’s for approval.
4. Internal Audit of MIJB Hosted Services. 
Assurances:
These largely come from the systems, process and procedures put in place by
NHS Grampian, which are still being operated, along with any new processes
which are put in place by the lead MIJB. 
North East System Wide Transformation Group (Officers only) led by the 4 pan-
Grampian chief executives. The aim of the group is to develop real top-level
leadership to drive forward the change agenda, especially relating to the delegated
hospital-based services.
Both the CEO group and the Chairs & Vice Chairs group meet quarterly. The
meetings are evenly staggered between groups, giving some six weeks between
them, allowing progressive work / iterative work to be timely between the forums. 
The Portfolio approach and wider system approach demonstrates closer joint
working across the three Health and Social Care Partnerships and the Acute Sector. 
Development Aims for 2025/26 
Discharge without Delay & Frailty at the Front Door 
Health and Social Care Moray is taking part, supported by the MIJB, in the National
Collaborative to support Discharge without Delay. This approach supports us in
undertaking mapping and self-assessment work and understanding where the
application of best practice and learning from other areas can help us improve locally
and get people home from an acute setting as quickly and safely as possible.  By
taking part in this collaborative, we aim to reduce further the number of people delayed
in our system and to ensure we apply optimum practice across acute and community
setting to do so.   
Page 236

Page 237

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 25 
MANAGEMENT COMMENTARY (continued) 
Realignment of Organisational Structures 
Since its inception the MIJB has sought to ensure the most effective and efficient
structures are in place to support the delivery of its strategic aims and overall strategic
plan.  Over the course of 2025/26 a review of the HSCM organisational structure will
take place that will support these aims and ensure that both HSCM and the MIJB have
the right resources in place, and the right operational structure to enact our plans,
deliver the best outcomes for people and operate sustainably within the current
challenging financial conditions.  Our organisational structure supports how we deliver
our ambitions in our communities and directly with people and is a key enabler in
driving progress against our priorities. 
Strengthening Integration and Oversight of Children, Families and Justice
within our system 
Children, Families and Justice Services were delegated formally to the MIJB in
2023/24 under the integration scheme and there is now reporting of these services
within the Clinical and Care Governance structures in place.  Moray Council and
Councillors retain statutory responsibilities for outcomes for Children and also remain
Corporate Parents in respect of those Children and Young People who are cared for
or accommodated out with their families.  MIJB is committed to ensuring robust
reporting across the system that ensures all partners can fulfil their statutory
obligations while focussing on improving outcomes for our young people.  A review
of current reporting arrangements will take place to reduce any duplication in
reporting whilst strengthening oversight of performance and delivery.
Strengthening Performance Oversight 
The MIJB approved its Strategic Delivery Plan at its meeting in May 2025, and this
now provides a clear line of sight from Strategic Plan to the impact of the
programmes, services and initiatives in place to deliver it.  Over the course of this
year, we aim to further strengthen this line of sight, aligned to the Board’s Risk
Appetite Statement, to ensure that our programmes of work are effective in achieving
their objectives and represent value for money.  
Page 237

Page 238

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 26 
MANAGEMENT COMMENTARY (continued) 
In addition, we will seek to: 
• Maintain our focus on early intervention and prevention, reducing demand and
supporting the resilience of people and communities.  We’ll undertake learning
from the successful Community Appointment Day which took place in Elgin as
a possible model to support this;
• Continue to develop how we care for our staff well-being, with staff our most
valuable asset;
• Provide leadership and participation as key partners in the NHS Grampian led
Strategic Change Programme and ensure we explore effective joint working;
• Focus our budget setting efforts in the context of the Medium Term Financial
Strategy and longer term sustainability. 
…………………………  ……………………… ……………………… 
Dennis Robertson     Judith Proctor  Deborah O’Shea 
Chair of Moray IJB   Chief Officer            Chief Financial Officer 
Page 238

Page 239

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 27 
STATEMENT OF RESPONSIBILITIES 
Responsibilities of the MIJB 
• To make arrangements for the proper administration of its financial affairs and
to secure that one of its officers has the responsibility for the administration of
those affairs.  In Moray Integration Joint Board, that officer is the Chief Financial
Officer; 
• To manage its affairs to achieve best value in the use of its resources and
safeguard its assets; 
• Ensure the Annual Accounts are prepared in accordance with legislation (The
Local Authority Accounts (Scotland) Regulations 2014) and so far as is
compatible with that legislation, in accordance with proper accounting practices
(section 12 of the Local Government in Scotland Act 2003); and 
• To approve the Annual Accounts. 
Signed on behalf of the Moray Integration Joint Board 
Dennis Robertson
Chair of Moray IJB
Page 239

Page 240

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 28 
STATEMENT OF RESPONSIBILITIES (continued)
Responsibilities of the Chief Financial Officer 
The Chief Financial Officer is responsible for the preparation of the Moray Integration
Joint Board’s statement of accounts in accordance with proper practices as set out in
the CIPFA/LASAAC Code of Practice on Local Authority Accounting in the United
Kingdom (the Code) 2024/25. 
In preparing the Annual Accounts the Chief Financial Officer has: 
• Selected suitable accounting policies and applied them consistently; 
• Made judgements and estimates that were reasonable and prudent; 
• Complied with legislation; and 
• Complied with the local authority code (in so far as it is compatible with
legislation). 
The Chief Financial Officer has also: 
• Kept proper accounting records that were up to date; and 
• Taken reasonable steps for the prevention and detection of fraud and other
irregularities. 
I certify that the financial statements give a true and fair view of the financial position
of the Moray Integration Joint Board as at 31 March 2025 and the transactions for the
year then ended. 
Deborah O’Shea FCCA
Chief Financial Officer 
Page 240

Page 241

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 29 
REMUNERATION REPORT 
Introduction
This Remuneration Report is provided in accordance with the Local Authority Accounts
(Scotland) Regulations 2014 (SSI2014/200) as part of the MIJB annual accounts.  This
report discloses information relating to the remuneration and pension benefits of
specified MIJB members. 
All information disclosed in the tables is subject to external audit.  Other sections within
the Remuneration Report will be reviewed for consistency with the financial
statements. 
Moray Integration Joint Board
The voting members of MIJB are appointed through nomination by Moray Council and
Grampian Health Board. There is provision within the Order to identify a suitably
experienced proxy or deputy member for both the voting and non-voting membership
to ensure that business is not disrupted by lack of attendance by any individual. 
MIJB Chair and Vice-Chair
Nomination of the MIJB Chair and Vice-Chair post holders alternates every 18 months
between a Councillor and a Health Board non-executive member. 
The MIJB does not provide any additional remuneration to the Chair, Vice-Chair or
any other board members relating to their role on the MIJB. The MIJB does not
reimburse the relevant partner organisations for any voting member costs borne by
the partner. 
The MIJB does not have responsibilities in either the current or in future years for
funding any pension entitlements of voting MIJB members.  Therefore, no pension
rights disclosures are provided for the Chair or Vice-Chair. 
Taxable
Expenses
2023/24
Name Position Held Nomination
By
Taxable
Expenses
2024/25
£    £
- Dennis
Robertson
Vice-Chair
01/04/24 – 26/09/24;
01/04/2025 to date
Chair 
27/09/24 to 31/03/25
Grampian
Health Board -
- Cllr Tracy
Colyer
Chair
01/04/24 – 26/09/24 Moray
Council  -
- Cllr Elaine
Kirby
Vice-Chair 21/11/24 –
31/03/25
Chair 1/04/25 to date
Moray
Council -
Page 241

Page 242

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 30 
REMUNERATION REPORT (continued) 
Officers of the MIJB
The MIJB does not directly employ any staff in its own right; however specific post-
holding officers are non-voting members of the Board. 
Chief Officer
Under section 10 of the Public Bodies (Joint Working) (Scotland) Act 2014 a Chief
Officer for the integration joint board has to be appointed and the employing partner
has to formally second the officer to the Board.  The employment contract for the Chief
Officer will adhere to the legislative and regulatory framework of the employing partner
organisation.  The remuneration terms of the Chief Officer‘s employment are approved
by the Board. 
Other Officers
No other staff are appointed by the MIJB under a similar legal regime.  Other non-
voting board members who meet the criteria for disclosure are included in the
disclosures below. 
Total
2023/24 Senior Employees Salary, Fees &
Allowances Total 2024/25
£  £ £
122,460
Simon Bokor-Ingram
Chief Officer (1/04/24-
31/05/24)
20,268 20,268
- Judith Proctor (from
25/07/24) 95,673 95,673
83,476 Deborah O’Shea
Chief Financial Officer 90,729 90,729 
In respect of officers’ pension benefits, the statutory liability for any future contributions
to be made rests with the relevant employing partner organisation.  On this basis there
is no pensions liability reflected on the MIJB balance sheet for the Chief Officer or any
other officers. 
The MIJB however has a responsibility for funding the employer contributions for the
current year in respect of the officer time spent on fulfilling the responsibilities of their
role on the MIJB.  The following table shows the MIJB’s funding during the year to
support the officers’ pension benefits.  The table also shows the total value of accrued
pension benefits which may include benefits earned in other employment positions
and from each officer’s own contributions. 
Page 242

Page 243

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 31 
REMUNERATION REPORT (continued) 
NOTE: no bonuses, expenses allowances, compensation for loss of office or any
taxable benefits were made in 2024/25 
In Year Pension
Contributions Accrued Pension Benefits  
Year to
31/03/24 
Year to
31/03/25  
As at
31/03/2025 
Difference
from
31/03/2024 
£ £  £ 000’s £ 000’s 
Simon Bokor-
Ingram, Chief
Officer (*)  24,346 4,378 
Pension  40 (6)
Lump Sum 101 (22) 
Judith Proctor,
Chief Officer  -  21,526
Pension 36 9
Lump Sum 99 19 
Deborah
O’Shea
Chief Financial
Officer 
7,179  20,339
Pension 9 (19)
Lump Sum 31 - 
(*) Simon Bokor-Ingram figures included in the table above, relate to the full year and
employment after Chief Officer, as figures are unable to be apportioned. 
Page 243

Page 244

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 32 
REMUNERATION REPORT (continued) 
Disclosure by Pay bands
As required by the regulations, the following table shows the number of persons whose
remuneration for the year was £50,000 or above, in bands of £5,000. 
Number of Employees in
Band 2023/24 Remuneration Band Number of Employees in
Band 2024/25
1 £80,000 - £84,999 -
- £85,000 - £89,999 1
1 £120,000 - £124,999 - 
£130,000 - £134,999 1 
Exit Packages
There were no exit packages agreed by the MIJB during 2024/25 financial year, or in
the preceding year. 
………………………..     ………………………
Dennis Robertson          Judith Proctor
Chair of Moray IJB      Chief Officer                                                                                 
Page 244

Page 245

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 33 
ANNUAL GOVERNANCE STATEMENT 
The Annual Governance Statement describes the Moray Integration Joint Board’s
(MIJB) governance arrangements and reports on the effectiveness of the MIJB’s
system of internal control.   
Scope of Responsibility 
The MIJB is responsible for ensuring that its business is conducted in accordance with
the law and appropriate standards, and that public money is safeguarded and used
efficiently and effectively in pursuit of best value. 
In discharging its responsibilities, the MIJB has established arrangements for its
governance which includes the system of internal control. This system is intended to
manage risk and support the achievement of the MIJB’s policies, aims and objectives. 
The system provides reasonable but not absolute assurance of effectiveness. 
The MIJB places reliance of the systems of internal control of NHS Grampian systems
and Moray Council, which supports organisational compliance of policies and
procedures in addition to those of the MIJB. Assurances are required on the
effectiveness of the governance arrangements of all three organisations, meaning a
significant failure in one of the three Partners may require to be disclosed in the annual
accounts of all three Partners. 
The Governance Framework 
The CIPFA/SOLACE framework for ‘Delivering Good Governance in Local
Government’ last updated in 2016 remains current and provides a structured approach
in defining seven principles that underpin effective governance arrangements.  Whilst
the framework is written specifically for Local Government, the principles apply equally
to integration authorities, and while the MIJB continues to evolve as an entity in its
own right. It continues to draw on the governance assurances of NHS Grampian and
Moray Council as its principal funding partners.   
Given the scope of responsibility within the MIJB and the complexities surrounding the
assurance arrangements, a Local Code of Corporate Governance was developed and
the MIJB assesses the effectiveness of its governance arrangements against the
principles set out in the document.  The Code outlines the seven governance principles
from the CIPFA/SOLACE guidance (as referenced below) and provides the sources
of assurance for assessing compliance relative to the MIJB, Moray Council and NHS
Grampian.  These assurances include referencing the governance arrangements of
NHS Grampian and Moray Council which are summarised annually and published in
their respective Annual Governance Statements which form part of the annual
accounts of each organisation.  The respective governance statements can be found
on the individual organisations websites: Moray Council: Annual Accounts - Moray
Council and NHS Grampian: https://www.nhsgrampian.org/about-us/annual-
accounts/. 
Page 245

Page 246

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 34 
ANNUAL GOVERNANCE STATEMENT (continued) 
Key Governance Arrangements 
All of the scheduled Audit Performance and Risk and Clinical Care Governance
Committee meetings were held as timetabled during 2024/25.   
Health and Social Care Moray (HSCM) established an emergency response group
that has been operational since the end of March 2020, this has now transformed into
a Daily Response meeting. Representation on the response groups of the Partner
organisations is provided by HSCM staff, ensuring the necessary links and flow of
information to ensure a co-ordinated response on a pan Grampian basis and locally
within Moray. 
There continues to be governance standards and collaborative working across the
whole system, both across the NHS Portfolios and Grampian wide system. The use of
a Grampian Operation Performance Escalation System (GOPES) was established to
enable senior leaders to have oversight of where pressures were located in the system
and to direct responses accordingly. This development has also strengthened the
identification of key metric thresholds to inform the levels for escalation. 
Evaluation of the Effectiveness of Governance
Governance Principle 1 – Behaving with integrity, demonstrating strong
commitment to ethical values and respecting the rule of law
Assessment of Effectiveness 
• The activities of the MIJB are governed by a Board comprising both voting
and non-voting members, drawn from a diverse range of backgrounds to
ensure broad representation. The Board meets bi-monthly and is supported
by regular development sessions that allow for in depth exploration of key
strategic and operational issues. Governance is further strengthened through
the work of two committees: the Audit, Performance and Risk Committee,
and a Clinical and Care Governance Committee, each with clearly defined
remits to support effective governance and assurance.  
The MIJB operates in accordance with Standing Orders, which set out the
rules governing the proceedings of the Board and its Committees. These
include the Scheme of Administration which defines the structure and remit
of the Board’s committees, ensuring clarity and consistency in governance
arrangements. 
• To uphold high standards of ethical conduct, the MIJB has appointed a
Standards Officer. This role supports compliance with the Ethical Standards
in Public Life etc. (Scotland) Act 2000, which requires members of devolved
public bodies to comply with Codes of Conduct approved by Scottish
Ministers. The Standards Officer also ensures alignment with guidance
issued by the Standards Commission for Scotland, reinforcing the Board’s
commitment to integrity, accountability, and ethical governance. 
Page 246

Page 247

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 35 
ANNUAL GOVERNANCE STATEMENT (continued) 
Governance Principle 2 – Ensuring openness and comprehensive stakeholder
engagement 
Assessment of Effectiveness 
• MIJB’s Standing Orders provide for public and press access to meetings and
reports, supporting transparency and accountability.  In response to positive
feedback and to enhance accessibility, hybrid meetings continued throughout
2024/25.  A dedicated website was developed for Health and Social Care
Moray and is continuously monitored for improvement, and about to transition
to a new platform to further improve the accessibility and quality of
information. Agendas, reports and minutes for all committees can be
accessed via Moray Council website, alongside links to all relevant strategies
of the MIJB.
• Both the voting and non-voting membership arrangements of the MIJB are in
line with the Public Bodies (Joint Working) (Integration Joint Boards)
(Scotland) Order 2014. There are eight voting members, four are elected
members appointed by Moray Council and four are non-executive members
of NHS Grampian Board. The non-voting membership comprises six
professional members and five stakeholder members representing: staff,
third sector bodies carrying out activities in relation to health and social care,
service users and unpaid carers, and six additional non-voting members
which include the Chief Executives of Moray Council and NHS Grampian in
an Ex-officio capacity. The broad membership of the MIJB ensures valued
input and engagement from a wide range of stakeholders.
• The Community Empowerment (Scotland) Act 2015 places a statutory duty
on MIJB and its Community Planning Partners to engage with communities
on the planning and delivery of services and securing local outcomes. The
MIJB has an approved Communications and Engagement Strategy which
recognises and promotes the active and meaningful engagement with all
stakeholders.   
Governance Principle 3 – Defining outcomes in terms of sustainable
economic, social and environmental benefits 
Assessment of Effectiveness 
• The MIJB Strategic Plan 2022-2032 building on the foundations of the 2019
plan, sets out long-term strategic objectives that are flexible and responsive to
emerging challenges and developments in health. To support the delivery of
these objectives a 3 year delivery plan was approved by MIJB in May 2025,
underpinned by a medium-term financial framework.
• The strategic plan is supported by a comprehensive suite of documents,
including a performance framework, workforce plan, and a communications,
engagement and participation plan. These documents are currently under
review, with a focus on enabling service transformation within existing financial
constraints.
• These documents collectively provide a structured approach to defining and
achieving outcomes, with a clear focus on medium term priorities. The outcomes
are directly aligned with the delivery of health and social care services and are
aimed at driving measurable improvements for the population of Moray. 
Page 247

Page 248

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 36 
ANNUAL GOVERNANCE STATEMENT (continued) 
• In support of environmental sustainability, a climate change duties report is
compiled and submitted annually on behalf of the MIJB, demonstrating the
Board’s commitment to meeting its statutory environmental responsibilities 
Governance Principle 4 – Determining the interventions necessary to optimise
the achievement of intended outcomes 
Assessment of Effectiveness 
• The MIJB’s decision making processes are designed to ensure that Board
members receive clear, objective and comprehensive analysis of available
options. Each proposal outlines how intended outcomes will be achieved,
supported by detailed assessments of associated risks and opportunities.   
• Board papers reflect the broad range of strategic and operational matters under
consideration. These include regular updates from the Chief Officer on current
developments, as well as agenda items covering both opportunities and
challenges, particularly those arising from reconfiguration and transformation of
services. 
• The MIJB recognises the importance of sound financial governance and has
adopted the Financial Management Code promoted by CIPFA as a guiding
framework for effective financial administration. A Medium-Term Financial
Strategy, approved in March 2025, supports this approach and will be reviewed
regularly to ensure alignment with the Strategic Plan, Delivery Plan and the
integration of delegated children’s services. 
Governance Principle 5 – Developing the entity’s capacity, including the
capability of its leadership and the individuals within it
Assessment of Effectiveness 
• The Senior Management Team (SMT) and Officers and have developed a
programme of Development sessions with Board members with a focus on the
challenging financial position and exploring opportunities for service
transformation. Officers present a range of proposals aimed at delivering the
MIJB’s strategic objectives whilst also contributing to the necessary financial
savings for the upcoming year. 
• The MIJB continues to prioritise leadership development and collaborative
working through the regular development sessions with Officers. These
sessions provide valuable opportunities for shared learning, strategic dialogue,
and constructive challenge, helping to strengthen leadership capabilities and
organisational resilience. 
Page 248

Page 249

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 37 
ANNUAL GOVERNANCE STATEMENT (continued) 
Governance Principle 6 – Managing risk and performance through robust
internal control and strong public financial management
Assessment of Effectiveness 
• As part of a robust risk monitoring framework the Strategic Risk Register was
co-developed with Board members during a dedicated development session in
October 2024 and was formally approved by the Board in May 2025. This
updated register will be reviewed monthly by the Senior Management Team and
updated and presented biannually to Audit, Performance and Risk Committee,
and annually to MIJB.   A related action log was created for monitoring purposes
and is owned and monitored by the Senior Management Team. The committee
agreed in October that the register would be presented biannually with the
caveat that any emerging or increasing risks would be presented as required.
• The Performance Management Framework has currently under review.
Performance reporting falls within the scope of the Audit, Performance and Risk
Committee and reporting is quarterly. This now includes reporting by the
delegated Children’s & Families Services.
• The internal control system is closely aligned with those of MIJB’s Partner
organisations, reflecting their operational responsibility for service delivery
under direction of the MIJB. The Audit, Performance and Risk committee
through its consideration of reports monitors the effectiveness of internal control
procedures.  The MIJB Chief Internal Auditor undertakes an annual review of
the adequacy of internal controls and the opinion is included within this
statement.
• The MIJB benefits from the oversight of an independent S95 Officer, who is a
member of the Board. This Officer provides expert advice on all financial matters
and ensure timely preparation and reporting of budget estimates, monitoring
reports and annual accounts.
• Governance arrangements have been developed and maintained to comply with
the core functions of various good framework guidelines including Code of
Practice on Managing the Risk of Fraud and Corruption, Public Sector Internal
Audit Standards (incorporating the principles of the Role of the Head of Internal
Audit), Audit Committees: Practical Guidance for Local Authorities and Police.
These frameworks support the MIJB’s commitment to strong financial
stewardship and effective internal control. 
Page 249

Page 250

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 38 
ANNUAL GOVERNANCE STATEMENT (continued)
Governance Principle 7 – Implementing good practices in transparency,
reporting and audit to deliver effective accountability
Assessment of Effectiveness 
• MIJB business is conducted through an approved cycle of Board meetings.  To
promote openness and accessibility, recordings of Board meetings are made
available to the public. In addition, agendas, reports and minutes are published
and accessible for the public to inspect.  There is a standardised reporting format
in place to ensure consistency, clarify and transparency in decision making
processes.
• The MIJB demonstrates its commitment to accountability through publication of
both its Annual Accounts and Annual Performance Report. Following formal
approval by the Board.
• The Chief Internal Auditor reports independently to the Audit, Performance and
Risk committee with direct access to the Chief Officer, Chief Financial Officer
and Chair of the Audit, Performance and Risk committee on any matter of
concern. Throughout 2024/25, the Chief Internal Auditor has continued to
provide regular reports to the Committee, supporting effective oversight of
internal accounts and assurance processes. 
Review of Adequacy and Effectiveness 
The MIJB has a responsibility for conducting, at least annually, a review of the
effectiveness of the governance arrangements, including the system of internal
control.  The review is informed by the work of the Senior Management Team (which
has responsibility for the development and maintenance of the internal control
framework environment), the work of the Internal Auditors and the Chief Internal
Auditor’s annual report and the reports from the External Auditor and other review
agencies and inspectorates. 
Internal Audit Opinion 
Moray Council’s Internal Audit Section delivers the Internal Audit Service for the Moray
Integration Joint Board (MIJB), and the Council’s Audit and Risk Manager holds the
Chief Internal Auditor appointment to the MIJB until the 31st of March 2026. The
Council’s Internal Audit Section has adopted the Public Sector Internal Audit
Standards (PSIAS), which requires the Chief Internal Auditor to deliver an annual
internal audit opinion and report, which has also been used to inform this governance
statement. 
The Chief Internal Auditor’s evaluation of the adequacy and effectiveness of the MIJB
framework of governance, risk management and internal control includes
consideration of the findings from the audit work undertaken by the Chief Internal
Auditor in his role as the Audit and Risk Manager for the Moray Council. Assurance is
also sought from the Internal Audit Service Provider for NHS Grampian of the
governance processes adopted by that organisation. This includes the Chief Internal
Auditor now being provided with internal audit reports by the Internal Audit Service
Provider for NHS Grampian of interest to the MIJB. In addition, reports issued by other 
Page 250

Page 251

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 39 
ANNUAL GOVERNANCE STATEMENT (continued) 
external review agencies are considered in the opinion provided by the Chief Internal
Auditor. 
Internal Audit operates independently within the organisation, with no management-
imposed limitations on the scope of audit work performed. In accordance with PSIAS,
the Chief Internal Auditor prepares a risk-based Audit Plan for the MIJB, considering
the internal audit arrangements of both Moray Council and NHS Grampian functions. 
The Annual Audit Plan for 2024/25 agreed to the following audits to be undertaken: 
• Out of Area Placements- A review of the systems and procedures of people
receiving adult social care services who are out of the Moray area. 
• Residential Care- A review to assess the adequacy of procedures and
administrative arrangements for third-party suppliers that provide care home
services. The audit also included testing to verify the accuracy of financial
assessments and the charging of residential care for both respite and
permanent care residents. 
• Fostering and Kinship- An audit to review fostering and kinship payments of
fees and allowances, ensuring they comply with agreed policies and
procedures.
The audit review of out of area placements identified significant concerns regarding
the progress in determining the ordinary residence status of individuals receiving adult
social care services, contractual arrangements with care providers, and budgetary
control arrangements. A review of residential care highlighted the need for improved
administrative processes and the potential for further digitalisation. The fostering and
kinship payments audit was found to be well managed within the scope of the review,
though some administrative control improvements were noted. 
In addition to the projects outlined in the Audit Plan, governance arrangements were
reviewed to prevent fraud and corruption. The audit found that further improvements
are needed to enhance the effectiveness of counter fraud measures. 
Internal Audit has also undertaken follow-up reviews to evidence the implementation
of recommendations from previously issued audit reports. The follow-up audits
undertaken of Self-Directed Support and the Moray Integrated Community Store found
several recommendations where revised timescales for implementing
recommendations were required. A previous review of social care information
governance noted a need for a single case recording system. The Service is seeking
a replacement for the current arrangements for recording social care information, but
there is a need for this to be progressed in a timely manner. Implementation of
recommendations is a key element in determining the adequacy and effectiveness of
governance and internal control systems. If recommendations are not implemented in
a timely manner, then weaknesses in control and governance frameworks will remain.  
Page 251

Page 252

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 40 
ANNUAL GOVERNANCE STATEMENT (continued)
The Chief Internal Auditor, after considering the results of the work carried out by
Internal Audit, together with other sources of assurance, has provided limited
assurance that the Moray Integration Joint Board had adequate systems of
governance and internal control for the year ended 31 March 2025. 
There is now a process in place within both the Senior Management Team (SMT) and
Operational Management Teams (OMT) that tracks all audit actions. SMT has a
regular discussion on these and a focus on those that are due completion or open and
overdue. There is ongoing discussion with the Internal Audit Team in relation to the
planned audits and in relation to agreeing audit actions to ensure improved accuracy
of agreeing feasible closure dates. Supporting all of this is an action plan overseen by
SMT. 
Prior Year Governance Issues 
The Annual Governance Statement for 2023/24 highlighted a number of areas for
development in looking to secure continuous improvement. An assessment of
progress is provided below: 
Area for Improvement Identified in
2023/24 
Action Undertaken / Progress Made in
2024/25
GP visioning programme to deliver
resilience and sustainability. 
Financial Sustainability with best value
and outcomes. 
Progress within the agreed priority
workstreams has been made across the
year and there have been regular updates
to the IJB on the programme.  A Visioning
refresh event was held in March 2025 and
further work to strengthen the programme
deliverables will be taken forward from that
into the next financial year. 
The Chief Officer has put in place a Budget
Savings Oversight Group (BSOG) which
supports oversight of the delivery of the
savings programme on a monthly basis.  A
Programme Management Office (PMO)
has been established to support this work
and our senior responsible officers for each
savings programme.  In addition, regular tri-
partite meetings between the Chief Officer,
Chief Finance Officer and the Director and
Head of Finance in NHS Grampian and
Moray Council take place to ensure shared
visibility on financial matters for all partners. 
Page 252

Page 253

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 41 
Area for Improvement Identified in
2023/24 
Action Undertaken / Progress Made in
2024/25
Assurance and reporting for Children’s
Social Work and Justice Services. 
Improvement in compliance with audit
recommendations. 
Assurance and reporting for CF&J
continues to take place in both the IJB and
its committees and within Moray Council
Structures. Resource has now been
secured to support a review of this across
2025/26 to ensure robust and proportionate
reporting that is cognisant of the statutory
roles of partner organisations.
Improvements continue to be made in this
area with a process now in place to review
audit actions in both the Operational
Management Team (OMT) and within the
Chief Officer’s Senior Management Team
(SMT). This provides visibility on the
delivery of actions within agreed timescales
and on those actions that remain open and
overdue so that a focus can be put upon
those and ensure their closure. 
Improvement on progress has been
evidenced; however, this area of
improvement requires further development
and will be included for developments in
2025/26. 
Further Developments 
Following consideration of the review of adequacy and effectiveness, the following
action plan has been established to ensure continual improvement of the MIJB’s
governance arrangements and progress against the implementation of these issues
will be assessed as part of the next annual review. 
Areas of focus for 2025/26
1. Developing further our approaches to frailty and Discharge without Delay.
2. Realigning our organisational structure to ensure effective delivery of strategy
and transformation.
3. Integration of Children’s Social Work and Justice Services governance and
oversight within the IJB.
4. Further strengthen performance oversight of the Board’s key strategies and
priorities.
5 Continue to improve on the progress for compliance with audit
recommendations.
ANNUAL GOVERNANCE STATEMENT (continued) 
Page 253

Page 254

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 42 
ANNUAL GOVERNANCE STATEMENT (continued) 
Key Governance challenges going forward will involve: 
• Providing capacity to meet statutory obligations and ambitions to transform
services, whilst managing expectations, increasing complexity and rising
demand for services and the wider societal economic challenges now
presented that also potentially drive demand. 
• As a Board, difficult decisions will be required in balancing how we meet the
needs of our community whilst operating within the available resource
envelope, this will be supported by our approach to risk as set out in our risk
appetite statement. 
• Continuing to address our work force challenges in respect of recruitment and
retention and where persistent vacancies will necessitate the need for redesign
of roles and/or services. 
• Continuing to work closely with NHS Grampian, Moray Council and Moray
Community Planning Partnership to build on existing relationships and
establishing collaborative leadership, and to maximise the opportunities from
an expanded health and social care remit within the revised Portfolio approach,
including Dr Grays hospital, and how the IJB contributes to the wider
community planning agenda in Moray and the North East. 
• Continuing to implement the recommendations of internal and external audit,
including learning from national reviews. 
• Continuing work with teams to provide assurance to MIJB as we develop the
governance structures for Children’s Social Work and Criminal Justice
Services that support decision making on how best to tackle poverty and
inequalities. 
• There have been no significant events up to the authorised for issue date. 
Page 254

Page 255

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 43 
ANNUAL GOVERNANCE STATEMENT (continued) 
Statement 
In our respective roles as Chair and Chief Officer of the MIJB, we are committed to
ensuring good governance and recognise the contribution it makes to securing
delivery of service outcomes in an effective and efficient manner. This annual
governance statement summarises the MIJB’s current governance arrangements and
affirms our commitment to ensuring they are regularly reviewed, developed and fit for
purpose.  Whilst recognising that improvements are required, as detailed earlier in the
statement, it is our opinion that a reasonable level of assurance can be placed upon
the adequacy and effectiveness of the MIJB’s governance arrangements. 
The ongoing challenge will be to meet all operational demands and pressures as we
continue to operate within the legacy of the Covid 19 pandemic and global financial
pressures, both of which have impacted at a socioeconomic level on our region and
the community. Pressure on financial settlements is increasing for all partners, and we
will continue to engage with them, the Scottish Government and the wider community
to agree plans and outcomes that are both sustainable and achievable within this
context.  Taking that forward will be challenging as we aim to fulfil the nine Health and
Wellbeing national health and well-being outcomes, and the strategic priorities
identified and detailed in our Strategic Plan. Good governance remains an essential
focus in delivering services in a way that both meets the needs of communities and
discharges statutory best value responsibilities. 
These were arrangements in place for 2024/25 and up to the date of authorised for
issue. 
…………………………    ………………………
Dennis Robertson     Judith Proctor
Chair of Moray IJB     Chief Officer 
Page 255

Page 256

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 44 
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT 
This statement shows the cost of providing services for the year ended 31 March 2025
according to generally accepted accounting practices.   
2023/24  2024/25
Net Expenditure  Net Expenditure   
£ 000  £ 000
7,942 Community Hospitals 8,329
5,702 Community Nursing 6,166
18,366 Learning Disabilities 19,975
11,506 Mental Health 12,055
1,726 Addictions 1,763
213 Adult Protection & Health Improvement 273
23,044 Care Services Provided In-House 22,754
25,191 Older People & Physical & Sensory Disability
Services 27,034
1,881 Intermediate Care and Occupational Therapy 1,972
1,808 Care Services Provided by External Providers 1,817
10,012 Other Community Services 10,280
2,828 Administration & Management 3,152
1,299 Other Operational services 1,535
21,339 Primary Care Prescribing 21,937
19,939 Primary Care Services 21,331
5,936 Hosted Services 5,665
1,777 Out of Area Placements 1,971
949 Improvement Grants 1,021
19,762 Children & Justice Services 19,626
6,898 Strategic Funds & Other Resources 6,020
14,665 Set Aside  15,639
202,783 Cost of Services 210,315   
(200,086) Taxation and Non-Specific Grant Income (note 5) (209,779)
2,697 Deficit on provision of Services 536
2,697 Total Comprehensive Income and Expenditure 536 
There are no statutory or presentational adjustments which reflect the MIJB’s
application of the funding received from partners.  The movement in the General Fund
balance is therefore solely due to the transactions shown in the Comprehensive
Income and Expenditure Statement. Consequently, an Expenditure and Funding
Analysis is not provided in these annual accounts. 
Children & Justice Services were integrated into the MIJB from 2023/24, with the first
year being the shadow year meaning all financial responsibilities remained with the
Council but from 2024/25 the MIJB has full control over the finances.
Page 256

Page 257

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 45 
MOVEMENT IN RESERVES STATEMENT 
This statement shows the movement in the year on the Moray Integration Joint Boards
(MIJB) reserves. The movements which arise due to statutory adjustments which
affect the General Fund balance are separately identified from the movements due to
accounting practices.  Additional detail included within note 7 on page 51. 
Movement of Reserves During
2024/25  
General
Fund
Balance   
£000    
Opening Balance at 1 April 2024   (1,986)    
Total Comprehensive Income and
Expenditure 
536        
(Increase) in 2024/25   536        
Closing Balance at 31 March 2025                    (1,450)     
Movement of Reserves During
2023/24  
General
Fund
Balance   
£000    
Opening Balance at 1 April 2023   (4,683)    
Total Comprehensive Income and
Expenditure 
2,697        
Decrease in 2023/24   2,697        
Closing Balance at 31 March 2024                    (1,986)     
Page 257

Page 258

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 46 
BALANCE SHEET 
The Balance Sheet shows the value of the Moray Integration Joint Board’s (MIJB)
assets and liabilities as at the balance sheet date.  The net assets of the MIJB (assets
less liabilities) are matched by the reserves held by the MIJB. 
31 March
2024
£000    Notes
31 March
2025
£000    
1,986 Short Term Debtors 6 1,450 
Current Assets      
- Short Term Creditors  - 
Current Liabilities      
- Provisions  -            
Long Term Liabilities      
1,986 Net Assets           1,450    
1,986 Usable Reserve General Fund 7 1,450            
1,986 Total Reserves  1,450 
The unaudited annual accounts were issued on 19 June 2025 and the audited annual
accounts were authorised for issue on 30 October 2025. 
The Annual Accounts present a true and fair view of the financial position of the
MIJB as at 31 March 2025 and its income and expenditure for the year then ended. 
Deborah O’Shea FCCA 
Chief Financial Officer 
Page 258

Page 259

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 47 
NOTES TO THE FINANCIAL STATEMENTS
Note 1 Significant Accounting Policies 
General Principles 
The Financial Statements summarise the Moray Integration Joint Board’s (MIJB)
transactions for the 2024/25 financial year and its position at the year-end of 31 March
2025. 
The MIJB was established under the requirements of the Public Bodies (Joint Working)
(Integration Joint Boards) (Scotland) Act 2014 and is a Section 106 body as defined
in the Local Government (Scotland) Act 1973. 
The Financial Statements are therefore prepared in compliance with the Code of
Practice on Local Authority Accounting in the United Kingdom 2024/25, supported by
International Financial Reporting Standards (IFRS), unless legislation or statutory
guidance requires different treatment. 
The accounts are prepared on a going concern basis, which assumes that the MIJB
will continue in operational existence for the foreseeable future. The historical cost
convention has been adopted. 
Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when settlement in
cash occurs. In particular: 
• Expenditure is recognised when goods or services are received, and their
benefits are used by the MIJB.
• Income is recognised when the MIJB has a right to the income, for instance by
meeting any terms and conditions required to earn the income, and receipt of
the income is probable.
• Where income and expenditure have been recognised but settlement in cash
has not taken place, a debtor or creditor is recorded in the Balance Sheet.
• Where debts may not be received, the balance of debtors is written down. 
Funding
The MIJB is primarily funded through funding contributions from the statutory funding
partners, Moray Council and Grampian Health Board.  Expenditure is incurred as the
MIJB commissions’ specified health and social care services from the funding partners
for the benefit of service recipients in Moray area. 
Cash and Cash Equivalents
The MIJB does not operate a bank account or hold cash. Transactions are settled on
behalf of the MIJB by the funding partners.  Consequently, the MIJB does not present
a ‘Cash and Cash Equivalent’ figure on the balance sheet.  The funding balance due
to or from each funding partner as at 31 March is represented as a debtor or creditor
on the MIJB’s Balance Sheet.   
Page 259

Page 260

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 48 
NOTES TO THE FINANCIAL STATEMENTS (continued) 
Note 1 Significant Accounting Policies (continued) 
Employee Benefits
The MIJB does not directly employ staff. Staff are formally employed by the funding
partners who retain the liability for pension benefits payable in the future. The MIJB
therefore does not present a Pensions Liability on its Balance Sheet. 
The MIJB has a legal responsibility to appoint a Chief Officer. More details on the
arrangements are provided in the Remuneration Report. The charges from the
employing partner are treated as employee costs. Where material the Chief Officer’s
absence entitlement as at 31 March is accrued, for example in relation to annual leave
earned but not yet taken. 
Charges from funding partners for other staff are treated as administration costs. 
Reserves
The MIJB’s reserves are classified as either Usable or Unusable Reserves.   
The MIJB’s only Usable Reserve is the General Fund. The balance of the General
Fund as at 31 March shows the extent of resources which the MIJB can use in later
years to support service provision. 
Indemnity Insurance
The MIJB has indemnity insurance for costs relating primarily to potential claim
liabilities regarding Board members.  Grampian Health Board and Moray Council have
responsibility for claims in respect of the services that they are statutorily responsible
for and that they provide. 
Unlike NHS Boards, the MIJB does not have any ‘shared risk’ exposure from
participation in the Clinical Negligence and Other Risks Indemnity Scheme (CNORIS). 
The MIJB participation in the CNORIS scheme is therefore analogous to normal
insurance arrangements. 
Note 2 Critical Judgements and Estimation Uncertainty 
In applying the accounting policies, the MIJB has had to make certain judgements
about complex transactions or those involving uncertainty about future events.  There
are no material critical judgements or estimation uncertainty. 
Page 260

Page 261

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 49 
NOTES TO THE FINANCIAL STATEMENTS (continued) 
Note 3 Events after the Reporting Period 
The unaudited accounts were issued by Deborah O’Shea, Chief Financial Officer on
19 June 2025 and the audited accounts were authorised for issue on 30 October 2025.
Events taking place after this date are not reflected in the financial statements or notes. 
Note 4 Expenditure and Income Analysis by Nature       
2023/24  2024/25
£000  £000
95,500 Services commissioned from Moray
Council
98,217
107,247 Services commissioned from  Grampian
Health Board
112,061
36 Auditor Fee: External Audit Work 37
202,783 Total Expenditure 210,315   
(200,086) Partners Funding Contributions and Non-
Specific Grant Income
(209,779)
2,697 Deficit on the Provision of Services 536 
Page 261

Page 262

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 50 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 5 Taxation and Non-Specific Grant Income 
2023/24  2024/25
£000  £000
84,615 Funding Contribution from Moray Council 88,441
115,471 Funding Contribution from Grampian
Health Board
121,338
200,086 Taxation and Non-specific Grant
Income
209,779 
The funding contribution from Grampian Health Board shown above includes
£15.639m in respect of ‘set aside’ resources relating to acute hospital and other
resources. These are provided by Grampian Health Board who retains responsibility
for managing the costs of providing the services. The MIJB however has responsibility
for the consumption of, and level of demand placed on, these resources.   
Note 6 Debtors 
31 March
2024 
31 March
2025
£000  £000
1,723 Grampian Health Board 1,187
263 Moray Council 263
1,986 Debtors 1,450 
Amounts owed by the funding partners are stated on a net basis. Creditor balances
relating to expenditure obligations incurred by the funding partners but not yet settled
in cash terms are offset against the funds they are holding on behalf of the MIJB. 
Page 262

Page 263

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 51 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 7 Usable Reserve: General Fund 
The MIJB holds a balance on the General Fund for two main purposes: 
• To earmark, or build up, funds which are to be used for specific purposes in the
future, such as known or predicted future expenditure needs. This supports
strategic financial management. 
• To provide a contingency fund to cushion the impact of unexpected events or
emergencies. This is regarded as a key part of the MIJB’s risk management
framework. 
The table below shows the movements on the General Fund balance: 
Earmarked
Reserves    
General
Reserves
PCIP &
Action 15
Other
Earmarked
Total  
£000 £000 £000 £000
Balance at 1 April
2023 
- 937 3,746 4,683
Transfers (out) 
2023/24 
- (904) (1,793) (2,697)
Balance at 31
March 2024 
- 33 1,953 1,986
Transfer (out)
2024/25 
- (33) (503) (536)
Balance at 31
March 2025 
- - 1,450 1,450 
Primary Care Improvement Fund (PCIP) - The purpose of this fund is to ring fence
funding received from the Scottish Government as part of its Primary Care
Transformation Plan; this includes Action 15 funding as part of this plan. 
Other earmarked reserves are noted in detail on pages 18 to 20. 
Page 263

Page 264

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 52 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 8 Agency Income and Expenditure 
On behalf of all IJB’s within Grampian Health Board, the MIJB acts as the lead
manager for Grampian Medical Emergency Department (GMED) and Primary Care
Contracts.  It commissions services on behalf of the other IJBs and reclaims the costs
involved. The payments that are made on behalf of the other IJBs, and the
consequential reimbursement, are not included in the Comprehensive Income and
Expenditure Statement (CIES) since the MIJB is not acting as principal in these
transactions. 
The amount of expenditure and income relating to the agency arrangement is shown
below: 
2023/24  2024/25
£000  £000
10,615 Expenditure on Agency Services  10,680
(10,615) Reimbursement for Agency Services (10,680)
- Net Agency Expenditure excluded
from the CIES
-
Page 264

Page 265

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 53 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 9 Related Party Transactions 
The MIJB has related party relationships with Grampian Health Board and Moray
Council.  In particular the nature of the partnership means that the MIJB may influence,
and be influenced by, its partners. The following transactions and balances included
in the MIJB’s accounts are presented to provide additional information on the
relationships.   
Transactions with Grampian Health Board 
2023/24  2024/25
£000  £000
(115,471) Funding Contributions received from the
NHS Board
(121,338)
107,064 Expenditure on Services Provided by the      
NHS Board
111,864
183 Key Management Personnel: Non-Voting
Board Members
197
(8,224) Net Transactions with Grampian Health
Board
(9,227) 
Key Management Personnel: The Chief Officer and Chief Financial Officer are non-
voting Board members and are both employed by Grampian Health Board and
recharged to the MIJB.  Details of the remuneration of both officers are provided in the
Remuneration Report.  The Chief Officer is a joint appointment made by Moray Council
and Grampian Health Board and is jointly accountable to the Chief Executives of both
organisations, as such this post is jointly funded. The Chief Financial Officer, whilst a
Board appointment, does not share this arrangement of funding. 
Balances with Grampian Health Board 
31 March
2024 
31 March
2025
£000  £000
1,723 Debtor balances: Amounts due from
Grampian Health Board
1,187
1,723 Net Balance due from Grampian Health
Board
1,187 
Page 265

Page 266

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 54 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 9 Related Party Transactions (continued) 
Transactions with Moray Council 
2023/24  2024/25
£000  £000
(84,615) Funding Contributions received from the
Council
(88,441)
95,455 Expenditure on Services Provided by the
Council
98,179
81 Key Management Personnel: Non-Voting
Board Members
75
10,921 Net Transactions with Moray Council 9,813 
Balances with Moray Council 
31 March
2024 
31 March
2025
£000  £000
263 Debtor balances: Amounts due from Moray
Council
263
263 Net Balance due from Moray Council 263 
Page 266

Page 267

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 55 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 10 VAT 
The MIJB is not registered for VAT and as such VAT is settled or recovered by the
partners. The VAT treatment of expenditure in the MIJB accounts depends on which
of the partners is providing the services as each of these partners are treated
differently for VAT purposes. 
VAT payable is included as an expense only to the extent that it is not recoverable
from His Majesty’s Revenue and Customs. VAT receivable is excluded from income. 
Note 11 Accounting Standards That Have Been Issued but Have Yet To Be
Adopted 
The Code requires the MIJB to identify any accounting standards that have been
issued but have yet to be adopted and could have material impact on the accounts.
This applies to the adoption of the following new or amended standards within the
2024/25 Code: 
• IAS 21 The Effects of Changes in Foreign Exchange Rate (Lack of
Exchangeability) issued in August 2023;
• IFRS 17 Insurance Contracts issued in May 2017; and
• Changes to the measurement of non-investment assets within the 2025 to 2026
Code include adaptations and interpretations of IAS16 Property, Plant and
Equipment, and IAS 38 Intangible Assets. 
The Code requires implementation from 1 April 2025 and there is, therefore, no impact
on the 2024/25 financial statements. 
The above amendments are not anticipated to have a material impact on the
information provided in the financial statements.    
Page 267

Page 268

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 56 
INDEPENDENT AUDITOR’S REPORT
Independent auditor’s report to the members of Moray Integration Joint Board
and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
We certify that we have audited the financial statements in the annual accounts of
Moray Integration Joint Board for the year ended 31 March 2025 under Part VII of
the Local Government (Scotland) Act 1973. The financial statements comprise the
Comprehensive Income and Expenditure Statement, Movement in Reserves
Statement, Balance Sheet and notes to the financial statements, including material
accounting policy information. The financial reporting framework that has been
applied in their preparation is applicable law and UK adopted international
accounting standards, as interpreted and adapted by the Code of Practice on Local
Authority Accounting in the United Kingdom 2024/25 (the 2024/25 Code).
In our opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the Board as at 31 March
2025 and of its income and expenditure for the year then ended;
• have been properly prepared in accordance with UK adopted international
accounting standards, as interpreted and adapted by the 2024/25 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts (Scotland)
Regulations 2014, and the Local Government in Scotland Act 2003. 
Basis for opinion
We conducted our audit in accordance with applicable law and International
Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice
approved by the Accounts Commission for Scotland. Our responsibilities under those
standards are further described in the auditor’s responsibilities for the audit of the
financial statements section of our report. We were appointed by the Accounts
Commission on 18 May 2022. Our period of appointment is five years, covering
2022/23 to 2026/27. We are independent of the Board in accordance with the ethical
requirements that are relevant to our audit of the financial statements in the UK
including the Financial Reporting Council’s Ethical Standard, and we have fulfilled
our other ethical responsibilities in accordance with these requirements. Non-audit
services prohibited by the Ethical Standard were not provided to the Board. We
believe that the audit evidence we have obtained is sufficient and appropriate to
provide a basis for our opinion. 
Page 268

Page 269

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 57 
INDEPENDENT AUDITOR’S REPORT (Continued)
Conclusions relating to going concern basis of accounting
We have concluded that the use of the going concern basis of accounting in the
preparation of the financial statements is appropriate.
Based on the work we have performed, we have not identified any material
uncertainties relating to events or conditions that, individually or collectively, may
cast significant doubt on the Board’s ability to continue to adopt the going concern
basis of accounting for a period of at least twelve months from when the financial
statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the
Board’s current or future financial sustainability. However, we report on the Board’s
arrangements for financial sustainability in a separate Annual Audit Report available
from the Audit Scotland website.
Risks of material misstatement
We report in our Annual Audit Report the most significant assessed risks of material
misstatement that we identified and our judgements thereon.
Responsibilities of the Chief Financial Officer and Moray Integration Joint Board for
the financial statements
As explained more fully in the Statement of Responsibilities, the Chief Financial
Officer is responsible for the preparation of financial statements that give a true and
fair view in accordance with the financial reporting framework, and for such internal
control as the Chief Financial Officer determines is necessary to enable the
preparation of financial statements that are free from material misstatement, whether
due to fraud or error.
In preparing the financial statements, the Chief Financial Officer is responsible for
assessing the Board’s ability to continue as a going concern, disclosing, as
applicable, matters related to going concern and using the going concern basis of
accounting unless there is an intention to discontinue the Board’s operations.
The Moray Integration Joint Board is responsible for overseeing the financial
reporting process.
Auditor’s responsibilities for the audit of the financial statements
Our objectives are to obtain reasonable assurance about whether the financial
statements as a whole are free from material misstatement, whether due to fraud or
error, and to issue an auditor’s report that includes our opinion. Reasonable
assurance is a high level of assurance, but is not a guarantee that an audit
conducted in accordance with ISAs (UK) will always detect a material misstatement 
Page 269

Page 270

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 58 
INDEPENDENT AUDITOR’S REPORT (Continued)
when it exists. Misstatements can arise from fraud or error and are considered
material if, individually or in the aggregate, they could reasonably be expected to
influence the decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and
regulations. We design procedures in line with our responsibilities outlined above to
detect material misstatements in respect of irregularities, including fraud. Procedures
include:
• using our understanding of the local government sector to identify that the
Local Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland Act 2003
are significant in the context of the Board;
• inquiring of the Chief Financial Officer as to other laws or regulations that may
be expected to have a fundamental effect on the operations of the Board;
• inquiring of the Chief Financial Officer concerning the Board’s policies and
procedures regarding compliance with the applicable legal and regulatory
framework;
• discussions among our audit team on the susceptibility of the financial
statements to material misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance with
laws and regulations.
The extent to which our procedures are capable of detecting irregularities, including
fraud, is affected by the inherent difficulty in detecting irregularities, the effectiveness
of the Board’s controls, and the nature, timing and extent of the audit procedures
performed.
Irregularities that result from fraud are inherently more difficult to detect than
irregularities that result from error as fraud may involve collusion, intentional
omissions, misrepresentations, or the override of internal control. The capability of
the audit to detect fraud and other irregularities depends on factors such as the
skilfulness of the perpetrator, the frequency and extent of manipulation, the degree
of collusion involved, the relative size of individual amounts manipulated, and the
seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial
statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of our auditor’s
report. 
Page 270

Page 271

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 59 
INDEPENDENT AUDITOR’S REPORT (Continued)
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the
Remuneration Report
We have audited the parts of the Remuneration Report described as audited. In our
opinion, the audited parts of the Remuneration Report have been properly prepared
in accordance with The Local Authority Accounts (Scotland) Regulations 2014.
Other information 
The Chief Financial Officer is responsible for the other information in the annual
accounts. The other information comprises the Management Commentary, Annual
Governance Statement, Statement of Responsibilities and the unaudited part of the
Remuneration Report. 
Our responsibility is to read all the other information and, in doing so, consider
whether the other information is materially inconsistent with the financial statements
or our knowledge obtained in the course of the audit or otherwise appears to be
materially misstated. If we identify such material inconsistencies or apparent material
misstatements, we are required to determine whether this gives rise to a material
misstatement in the financial statements themselves. If, based on the work we have
performed, we conclude that there is a material misstatement of this other
information, we are required to report that fact. We have nothing to report in this
regard.
Our opinion on the financial statements does not cover the other information and we
do not express any form of assurance conclusion thereon except on the
Management Commentary and Annual Governance Statement to the extent explicitly
stated in the following opinions prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management
Commentary and Annual Governance Statement
In our opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial year
for which the financial statements are prepared is consistent with the financial
statements and that report has been prepared in accordance with statutory
guidance issued under the Local Government in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the financial
year for which the financial statements are prepared is consistent with the
financial statements and that report has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework (2016). 
Page 271

Page 272

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 60 
INDEPENDENT AUDITOR’S REPORT (Continued)
Matters on which we are required to report by exception
We are required by the Accounts Commission to report to you if, in our opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration Report are
not in agreement with the accounting records; or
• we have not received all the information and explanations we require for our
audit. 
We have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to our responsibilities for the annual accounts, our conclusions on the
wider scope responsibilities specified in the Code of Audit Practice, including those
in respect of Best Value, are set out in our Annual Audit Report.
Use of our report
This report is made solely to the parties to whom it is addressed in accordance with
Part VII of the Local Government (Scotland) Act 1973 and for no other purpose. In
accordance with paragraph 108 of the Code of Audit Practice, we do not undertake
to have responsibilities to members or officers, in their individual capacities, or to
third parties. 
Angela Pieri, (for and on behalf of Grant Thornton UK LLP),
120 Bothwell Street, Glasgow, G2 7JS
Date:  
Page 272

Page 273

APPENDIX 1 
Moray Integration Joint Board Annual Accounts 2024/25 61 
Page 273

Page 274

APPENDIX 2                        
Health & Social Care Moray
Judith Proctor
Chief Officer
Health & Social Care Moray
Moray Council HQ
High Street
ELGIN IV30 1BX
01343 563552
hscmchiefofficer@moray.gov.uk
www.hscmoray.co.uk 
Grant Thornton UK LLP
120 Bothwell Street
Glasgow
G2 7JS 
Moray Integration Joint Board
Financial Statements for the year ended 31 March 2025
This representation letter is provided in connection with the audit of the financial statements of Moray
Integration Joint Board (the “IJB”) for the year ended 31 March 2025 for the purpose of expressing an
opinion as to whether the IJB’s financial statements are presented fairly, in all material respects in
accordance with International Financial Reporting Standards, and the CIPFA/LASAAC Code of Practice
on Local Authority Accounting in the United Kingdom 2024/25 and applicable law. 
We confirm that to the best of our knowledge and belief having made such inquiries as we considered
necessary for the purpose of appropriately informing ourselves:
Financial Statements
i. We have fulfilled our responsibilities for the preparation of the IJB’s financial statements in
accordance with International Financial Reporting Standards and the CIPFA/LASAAC Code of
Practice on Local Authority Accounting in the United Kingdom 2024/25 ("the Code"); in particular
the financial statements are fairly presented in accordance therewith.
ii. We have complied with the requirements of all statutory directions affecting the IJB and these
matters have been appropriately reflected and disclosed in the financial statements.
iii. The IJB has complied with all aspects of contractual agreements that could have a material effect
on the financial statements in the event of non-compliance. There has been no non-compliance
with requirements of any regulatory authorities that could have a material effect on the financial
statements in the event of non-compliance.
iv. We acknowledge our responsibility for the design, implementation and maintenance of internal
control to prevent and detect fraud.
v. We are satisfied that the methods, the data and the significant assumptions used by us in making
accounting estimates and their related disclosures are appropriate to achieve recognition,
measurement or disclosure that is reasonable in accordance with the Code and adequately
disclosed in the financial statements.  In this context we confirm there are no significant
assumptions and accounting estimates.  
Page 274

Page 275

vi. Except as disclosed in the financial statements:
a. there are no unrecorded liabilities, actual or contingent
b. none of the assets of the IJB has been assigned, pledged or mortgaged
c. there are no material prior year charges or credits, nor exceptional or non-recurring items
requiring separate disclosure.
vii. Related party relationships and transactions have been appropriately accounted for and disclosed
in accordance with the requirements of International Financial Reporting Standards and the Code.
viii. We have considered the disclosures changes schedules included in your Auditor’s Annual Report.
The financial statements have been amended for these disclosure changes and they financial
statements are free of material misstatements, including omissions.
ix. All events subsequent to the date of the financial statements and for which International Financial
Reporting Standards and the Code require adjustment or disclosure have been adjusted or
disclosed.
x. Actual or possible litigation and claims have been accounted for and disclosed in accordance with
the requirements of International Financial Reporting Standards.
xi. We have no plans or intentions that may materially alter the carrying value or classification of
assets and liabilities reflected in the financial statements.
xii. We have updated our going concern assessment. We continue to believe that the IJB financial
statements should be prepared on a going concern basis and have not identified any material
uncertainties related to going concern on the grounds that : 
a. the nature of the IJB means that, notwithstanding any intention to cease its operations in
their current form, it will continue to be appropriate to adopt the going concern basis of
accounting because, in such an event, services it performs can be expected to continue to
be delivered by related public authorities and preparing the financial statements on a going
concern basis will still provide a faithful representation of the items in the financial
statements
b. the financial reporting framework permits the entry to prepare its financial statements on
the basis of the presumption set out under a) above; and 
c. the IJB system of internal control has not identified any events or conditions relevant to going
concern.
We believe that no further disclosures relating to the IJB’s ability to continue as a going concern
need to be made in the financial statements. 
xiii. The IJB has complied with all aspects of ring-fenced grants that could have a material effect on the
IJB’s financial statements in the event of non-compliance.
Information Provided
xiv. We have provided you with:
a. access to all information of which we are aware that is relevant to the preparation of the
IJB’s financial statements such as records, documentation and other matters;
b. additional information that you have requested from us for the purpose of your audit; and
c. access to persons within the Council and NHS via remote and in person arrangements from
whom you determined it necessary to obtain audit evidence.
Page 275

Page 276

xv. We have communicated to you all deficiencies in internal control of which management is aware.
xvi. All transactions have been recorded in the accounting records and are reflected in the financial
statements.
xvii. We have disclosed to you the results of our assessment of the risk that the financial statements
may be materially misstated as a result of fraud.
xviii. We have disclosed to you all information in relation to fraud or suspected fraud that we are aware
of and that affects the IJB and involves:
a. management;
b. employees who have significant roles in internal control; or
c. others where the fraud could have a material effect on the financial statements.
xix. We have disclosed to you all information in relation to allegations of fraud, or suspected fraud,
affecting the financial statements communicated by employees, former employees, analysts,
regulators or others.
xx. We have disclosed to you all known instances of non-compliance or suspected non-compliance
with laws and regulations whose effects should be considered when preparing financial
statements.
xxi. We have disclosed to you the identity of the IJB’s related parties and all the related party
relationships and transactions of which we are aware.
xxii. We have disclosed to you all known actual or possible litigation and claims whose effects should
be considered when preparing the financial statements.
Annual Governance Statement
xxiii. We are satisfied that the Annual Governance Statement (AGS) fairly reflects the IJB’s risk
assurance and governance framework and we confirm that we are not aware of any significant
risks that are not disclosed within the AGS.
Management Summary
xxiv. The disclosures within the Management Summary fairly reflect our understanding of the IJB’s
financial and operating performance over the period covered by the IJB’s financial statements.
Approval
The approval of this letter of representation was minuted by the IJB Board at its meeting on 30 October
2025.
Yours faithfully 
Name: Judith Proctor
Position:  Chief Officer 
Date: 
Signed on behalf of the Moray Integration Joint Board 
Page 276

Page 277

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE AND
RISK COMMITTEE ON 29 OCTOBER 2025 
SUBJECT: PUBLIC SECTOR INTERNAL AUDIT STANDARDS - EXTERNAL QUALITY
ASSESSMENT OF THE INTERNAL AUDIT SECTION- FOLLOW UP
REVIEW 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 The purpose of this report is to provide an update on the implementation of
recommendations detailed within the external quality assessment undertaken
on the Council’s Internal Audit Section. 
2. RECOMMENDATION 
2.1 Committee is asked to consider the contents of the report, seek clarification
on any points noted and otherwise note the report. 
3.  BACKGROUND 
3.1 The Local Authority Accounts (Scotland) Regulations 2014 paragraph 7 requires
that ‘a local authority must operate a professional and objective internal auditing
service in accordance with recognised standards and practices in relation to
internal auditing’. 
3.2 The recognised standards adopted by all Scottish councils are the Public Sector
Internal Audit Standards (PSIAS) developed by standard setters, including the
Chartered Institute of Public Finance and Accountancy and the Chartered
Institute of Internal Auditors. The standards include a requirement for an
External Quality Assessment (EQA) of internal audit once every five years and for
the findings to be considered at a meeting of a Council committee. An EQA of the
Council’s Internal Audit Section was completed last year by the Chief Internal
Auditor of Perth and Kinross Council. The findings were reported to this
Committee on 26 September 2024 (paragraph 10 of the minute refers). This
report provides an update on the implementation of recommendations
contained within this EQA report.
Item 12.
Page 277

Page 278

4.  KEY MATTERS RELEVANT TO RECOMMENDATION 
Public Sector Internal Audit Standards- External Quality Assessment of the
Internal Audit Section- Follow Up Review Audit Plan 2025/26
4.1 Through the Scottish Local Authorities Chief Internal Auditors’ Group, in which
the Council participates, it was agreed that the EQA requirement could be met
through a peer review process. This required each Council’s chief internal
auditor to lead a review of another Council’s internal audit service and receive
a review in return. Perth and Kinross Council was selected to undertake the
assessment of  the Moray Council’s Internal Audit Section. 
4.2 An assessment took place in March 2024, during which the Chief Internal
Auditor of Perth and Kinross Council reviewed the operating arrangements
within Moray against the PSIAS. The overall conclusion of the external
assessment is that Moray Council’s Internal Audit Section fully conforms with
the PSIAS. This represents the highest level of conformance and should
reassure members and senior management about the effectiveness of the
Internal Audit Section’s operating arrangements. However, the report included
several recommendations, highlighting the need to reinforce Internal Audit’s
role as an independent appraisal function for the Council and its partner
organisations, as well as concerns regarding the availability of staffing
resources. 
4.3 A follow-up review has been undertaken by the Senior Auditor to evidence the
implementation of the recommendations. The Follow-Up Report is included in
Appendix 1. It is pleasing to confirm that the majority of the recommendations
have been implemented. 
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Moray Partners
in Care 2022-2032” 
Internal audit work supports good governance and assists in securing
appropriate  systems of internal control. 
(b)  Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the Local
Authority Accounts (Scotland) Regulations 2014, and there is a requirement
to provide a service in accordance with published Public Sector Internal
Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications
Audit reports highlight risk implications and contain recommendations for
management to address as a means of mitigating. 
Page 278

Page 279

(e) Staffing Implications
No implications directly arising from this report 
(f)   Property
No implications. 
(g)  Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions 
None arising directly from this report. 
(j)   Consultations
There have been no direct consultations during the preparation of this       
report. 
6. CONCLUSION 
6.1 Committee is asked to consider and note the progress made in
implementing the recommendations detailed in the External Quality
Assessment Report of the Internal Audit Section. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/
Page 279

Page 280

Appendix 1
XXX 2020 Page 1 
EXTERNAL QUALITY
ASSESSMENT 2
OF 
MORAY COUNCIL’S
INTERNAL AUDIT SERVICE 
Report Recipients: 
J Mundell, Interim Chief Executive
D Whitworth, Depute Chief Executive (Education, Communities & Organisational                            
Development)
A McEachan, Head of Governance, Strategy & Performance
D Lewis, Chief Audit Executive (Audit and Risk Manager)
Councillor G Leadbitter, Chair of Audit & Scrutiny Committee 
Page 280

Page 281

EXECUTIVE SUMMARY 
2
1.  INTRODUCTION 
1.1 The mandatory Public Sector Internal Audit Standards (PSIAS), published initially in
April 2013 and updated most recently in March 2017, apply to all internal audit service
providers in the UK public sector, whether in-house, provided via a shared service
arrangement or outsourced. To supplement the PSIAS and provide specific guidance
surrounding its application within a local government setting, the Chartered Institute of
Public Finance and Accountancy (CIPFA) compiled a Local Government Application
Note, which was last updated in 2019. 
1.2 The objectives of the PSIAS are to define the nature of internal auditing within the UK
public sector; set basic principles for carrying out internal audit; establish a framework
for providing internal audit services, which add value to the organisation, leading to
improved organisational processes and operations; establish the basis for the evaluation
of internal audit performance and drive improvement planning. 
1.3 The PSIAS require the Chief Audit Executive (the Audit and Risk Manager in Moray
Council) to develop and maintain a quality assurance and improvement programme
(QAIP) that covers all aspects of the internal audit activity.  The QAIP must include both
periodic internal self-assessments and five-yearly external assessments, carried out by
a qualified, independent assessor from outwith the organisation, and enable evaluation
of the internal audit activity’s (Internal Audit in Perth & Kinross Council) conformance
with the PSIAS, including the Mission of Internal Audit, Definition of Internal Auditing and
Code of Ethics. In addition, the QAIP should also assess the efficiency and effectiveness
of the internal audit activity and identify opportunities for improvement. 
1.4 To assist its members to meet the five-yearly external assessment requirement, the
Scottish Local Authorities Chief Internal Auditors’ Group (SLACIAG) established a
collaborative system of formal peer reviews.  This approach not only assists with
ensuring that independent assessors, and their teams, have appropriate knowledge and
experience of the local government internal audit environment but also removes the
financial burden from councils, associated with procuring these services externally.  The
allocation of assessors / assessment teams to councils participating in the peer review
process was undertaken autonomously, ensuring that, amongst other governing
principles, local authorities with perceived / known conflicts of interest could not review
one another.  At the outset, assessors were required to formally declare any interests
so that these could be appropriately addressed during the allocation process.  Perth &
Kinross Council was selected to carry out the external assessment in Moray Council.   
1.5 To support the peer review process, SLACIAG developed a comprehensive External
Quality Assessment (EQA) framework, including an EQA Checklist for Assessing
Conformance with the PSIAS and the Local Government Application Note (EQA
Checklist) and a key Stakeholder Questionnaire proforma. The external assessment of
Moray Council’s Internal Audit Service has been carried out by Perth & Kinross Council’s
Internal Audit service utilising this framework.   
1.6 This report provides a high level summary of requirements for each standard per the
PSIAS and CIPFA Local Government Application Note and sets out the findings,
conclusions and recommendations from the external assessment, which involved
discussions with key members of staff, including the Chief Audit Executive, review of the
most recent self-assessment carried out utilising the EQA Checklist and consideration
of other relevant supporting documentation / information (Evidence Pack) including
working paper files and completed stakeholder questionnaires. A comprehensive list of
supporting documentation / information and completed stakeholder questionnaires
considered as part of the assessment can be found at appendices B and C respectively.
Page 281

Page 282

3 
2.  OVERALL CONCLUSION
2.1 The overall conclusion of the external assessment is that Moray Council’s Internal Audit
Service fully conforms with the PSIAS.  However, it should be noted that Standard ref
No. 1100.2 Independence & Objectivity have been assessed as generally conforms
and steps should be taken to address the associated areas for improvement. A full
summary of assessment, per assessment area, can be found at Appendix A.  A
summary of totals is as follows:   
Fully
Conforms     
Generally
Conforms     
Partially
Conforms     
Does Not
Conform   
TOTALS 13 1 0 0 
2.2 The main areas for improvement highlighted in the report are as follows: 
• Enhancing the organisational independence of the Chief Audit Executive by including
the role of the post within the Scheme of Delegation
• Ensuring clarity over areas where the Chief Audit Executive has functional
responsibility 
2.3 Full details of the assessment recommendations and management responses can be
found in the Action Plan at Appendix D. 
Page 282

Page 283

4 
3.  SECTION A – MISSION OF INTERNAL AUDIT AND CORE PRINCIPLES 
The PSIAS state that the Mission of Internal Audit articulates what internal audit aspires
to accomplish within an organisation, which is ‘to enhance and protect organisational
value by providing risk-based and objective assurance, advice and insight’.   
Taken as a whole, the Core Principles for the Professional Practice of Internal Auditing,
as set out in the PSIAS, articulate internal audit effectiveness.  For an internal audit
function to be considered effective, all Core Principles should be present and operating
effectively.  Failure to achieve any of the Core Principles would imply that an internal
audit activity was not as effective as it could be in achieving the Mission of Internal Audit. 
3.1 Evidence obtained from assessing conformance with other standards in the PSIAS has
been used, along with specific consideration surrounding the achievement of the Core
Principles, to conclude that the Internal Audit Service at Moray Council fully conforms
with accomplishing the Mission of Internal Audit as detailed above. 
4. SECTION B – DEFINITION OF INTERNAL AUDITING 
The PSIAS state that internal auditing is an independent, objective assurance and
consulting activity designed to add value and improve an organisation’s operations. It
helps an organisation accomplish its objectives by bringing a systematic, disciplined
approach to evaluate and improve the effectiveness of risk management, control and
governance processes. 
4.1 Evidence obtained from assessing conformance with other standards in the PSIAS has
been used to conclude that the Internal Audit Service at Moray Council fully conforms
with the definition of Internal Auditing as detailed above.  The main reasons for this
assessment include the Internal Audit Charter and engagement with stakeholders. 
5.  SECTION C – CODE OF ETHICS 
The PSIAS state that the purpose of the Institute of Internal Auditor’s Code of Ethics is
to promote an ethical culture in the profession of internal auditing. A code of ethics is
necessary and appropriate for the profession of internal auditing, founded as it is on the
trust placed in its objective assurance about risk management, control and governance. 
Internal auditors in UK public sector organisations must conform to the Code of Ethics
as set out in the PSIAS. If individual internal auditors have membership of another
professional body then he or she must also comply with the relevant requirements of
that organisation. 
5.1 Evidence obtained from assessing conformance with other standards in the PSIAS, in
particular the Attribute Standards 1000 – Purpose Authority and Responsibility, 1100 –
Independence and Objectivity, 1200 – Proficiency and Due Professional Care and
Professional Standards 2000 – Managing the Internal Audit Activity and 2300 –
Performing the Engagement, has been used to conclude that Moray Council’s Internal
Audit Service fully conforms with the requirement to comply with the Code of Ethics.   
Page 283

Page 284

5 
6. SECTION D – ATTRIBUTE STANDARDS 
Attribute Standards apply to organisations and individual internal auditors
providing the internal audit services in a local authority. 
6.1 1000 - Purpose, Authority, and Responsibility 
The PSIAS state that the purpose, authority and responsibility of the internal audit
activity must be formally defined in an Internal Audit Charter, consistent with the Mission
of Internal Audit and the mandatory elements of the International Professional Practices
Framework.  The chief audit executive must periodically review the internal audit charter
and present it to senior management and the board for approval.  The internal audit
charter must also: 
• define the terms ‘board’ and ‘senior management’ for the purposes of internal audit
activity;
• cover the arrangements for appropriate resourcing; 
• define the role of internal audit in any fraud-related work; and 
• describe safeguards to limit impairments of independence or objectivity if internal
audit or the chief audit executive undertakes non-audit activities. 
6.1.1 Moray Council’s Internal Audit Charter is periodically reviewed with the most recent
review taking place in 2022.  The Internal Audit Charter was approved by the Audit &
Scrutiny Committee on 23 November 2022. 
6.1.2 Having considered the findings above, it has been concluded that the Internal Audit
Service at Moray Council fully conforms with Standard 1000 on Purpose, Authority and
Responsibility. 
6.2 1100 - Independence and Objectivity 
The internal audit activity must be independent and internal auditors must be objective
in performing their work.  Various aspects of independence and objectivity are covered
in this standard as well as 1200, including reporting functional lines of the CAE, the
relationship between the CAE and the board and any impairment to individual internal
auditors’ objectivity or independence. Reporting and management arrangements must
be put in place that preserve the CAE’s independence and objectivity, in particular with
regard to the principle that the CAE must be independent of the audited activities. 
6.2.1 The Chief Audit Executive reports functionally to the Audit & Scrutiny Committee and
administratively to the Head of Governance, Strategy & Performance, who is a member
of the Council’s Corporate Management Team.  The Chief Audit Executive has direct
and unrestricted access to the Chief Executive and the Chair of the Audit & Scrutiny
Committee and this has been confirmed through Stakeholder engagement.  These
reporting / access arrangements are defined within the job description of the Chief Audit
Executive but not specifically within the Internal Audit Charter. The Audit Charter does
contain reference to arrangements for safeguards to limit impairment of independence
or objectivity on behalf of the audit team.   
6.2.2 In support of organisational independence, the Chief Audit Executive attends the Audit
& Scrutiny Committee meetings to present all internal audit reports (including, for
example, the Internal Audit Charter, Annual Report, Internal Audit Plan and reports /
executive summaries from the planned audits) to Elected Members.  The reports are all
submitted in the Chief Audit Executive’s name.   
6.2.3 The Chief Audit Executive has functional and operational responsibility for non-audit
activities, namely supporting business continuity and risk management arrangements
within services. This function is operationally kept separate from the delivery of internal
audit. but this, and the potential for impairment to the Chief Audit Executive’s
Page 284

Page 285

6 
independence and objectivity, is not clearly communicated to stakeholders through the
Audit Charter.     
6.2.4 All staff within the Internal Audit service are required to complete a declaration form, that
includes the requirement to raise any issues or concerns where a conflict of interest may
arise on an annual basis.   
6.2.5 There is scope for improving clarity regarding reporting lines by explicitly stating
reporting lines within the Audit Charter 
6.2.6 Furthermore, there is scope to consider the Chief Audit Executive’s delegated authority
within the Scheme of Delegation. 
6.2.7 Where the Chief Audit Executive has roles and responsibility in addition to Internal Audit,
this should be clearly communicated to the Audit & Scrutiny Committee and Senior
Officers. The Audit Charter should be updated in this regard to ensure that there are
clear arrangements for ensuring the independence and objectivity of the Internal Audit
function. 
6.2.8 Moray Council’s Internal Audit Service generally conforms with Standard 1100 on
Independence and Objectivity. 
6.3 1200 - Proficiency and Due Professional Care 
The CAE must be professionally qualified, suitably experienced and responsible, in
accordance with the organisation’s human resources processes, for recruiting
appropriate staff.  He or she is responsible for ensuring that up-to-date job descriptions
exist, reflecting roles and responsibilities, and that person specifications define the
required qualifications, competencies, skills, experience and personal attributes. 
The CAE should periodically assess individual auditors’ skills and competencies against
those set out in the relevant job descriptions and person specifications. Any training or
development needs identified should be included in an appropriate ongoing
development programme that is recorded and regularly reviewed and monitored. In
addition, all internal auditors have a personal responsibility to undertake a programme
of continuing professional development (CPD) to maintain and develop their
competence. This may be fulfilled through requirements set by professional bodies or
through the organisation’s own appraisal and development programme. Auditors should
maintain a record of such professional training and development activities. 
The internal audit activity should be appropriately resourced to meet its objectives. It
should have appropriate numbers of staff in terms of grades, qualifications, personal
attributes and experience or have access to appropriate resources in order to meet its
objectives and to comply with these standards. The PSIAS states that the CAE must
obtain competent advice and assistance if the activity is unable to perform all or part of
an engagement. 
6.3.1 The Chief Audit Executive holds a relevant professional qualification and is suitably
experienced, with over 30 years internal audit experience within local government.  The
Chief Audit Executive is a member of SLACIAG and regularly attends and contributes
to meetings.  In relation to the two SLACIAG Sub-groups, the Computer Audit Sub-
Group (CASG) and the Scottish Local Authorities Investigators Group (SLAIG), Moray
Council’s Internal Audit team is represented on both.   
Page 285

Page 286

7 
6.3.2 To support the Chief Audit Executive in Moray Council’s Internal Audit service there is
one Senior Auditor, who is also suitably qualified and experienced.  There are a total of
3.8 FTE members of staff in the Internal Audit service, including the Chief Audit
Executive and Senior Auditor.  The Internal Audit Service delivers internal audit services
to Moray Council, Moray Integration Joint Board, the Grampian Valuation Board and
Moray Growth Deal. Whilst there are no specialist computer auditors or fraud
investigators, the Chief Audit Executive is a member of the Computer Audit Sub Group
and the team contains officers who are experienced in fraud and corruption
investigations. 
6.3.3 All Internal Audit team members participate in Moray Council’s corporate Employee
Review and Development process.   
6.3.4 The Internal Audit Service is represented on a number of corporate groups, including
the Information Assurance Group and the Leadership Forums, and may be asked to
advise other Council groups on specific issues connected with the control environment. 
6.3.5 The Chief Audit Executive, Senior Auditor and one auditor have specific CPD
requirements to adhere to, with the remaining team member currently undertaking
professional training with the Institute of Internal Auditors. Training records are held.   
6.3.6 Engagement with key stakeholders, as part of the validation of the self assessment
process has confirmed that the Chief Audit Executive demonstrates sufficient knowledge
and experience and that all members of the Internal Audit Service exercise due
professional care.   
6.3.7 Consideration should be given to the size of the Internal Audit team in order to ensure
that the Internal Audit Service meet its objectives for all organisations that it provides
internal audit services to (as detailed in 6.3.2). 
6.3.8 Moray Council’s Internal Audit Service fully conforms with standard 1200 on
Proficiency and Due Professional Care. 
6.4 1300 - Quality Assurance and Improvement Programme 
The PSIAS state that the Chief Audit Executive must develop and maintain a quality
assurance and improvement programme (QAIP) that covers all aspects of the internal
audit activity. 
The QAIP must include both periodic internal self-assessments and five-yearly external
assessments, carried out by a qualified, independent assessor from outside the
organisation, and enable evaluation of the internal audit activity’s conformance with the
PSIAS, including the Definition of Internal Auditing and Code of Ethics. In addition, the
QAIP should also assess the efficiency and effectiveness of the internal audit activity
and identify opportunities for improvement. 
The public sector requirement in the PSIAS states that results of the QAIP and progress
against any improvement plans must be reported in the annual report. 
6.4.1 Internal audit reports are reviewed by the Chief Audit Executive prior to issue and
working papers are reviewed by either the Chief Audit Executive or Senior Internal
Auditor.  Where the assignment is carried out by the Senior Internal Auditor, the Chief
Audit Executive will review the working paper file.   
6.4.2 Client feedback is actively pursued by the Internal Audit Service for assignments carried
out within Moray Council. 
Page 286

Page 287

8 
6.4.3 Performance measures are in place to monitor the performance of the Internal Audit
service. These include the audit plan delivery and the budget surrounding the plan. The
performance against these measures is reported to Audit & Scrutiny Committee as part
of the Annual Audit Report and Opinion. 
6.4.4 The EQA Checklist has been used for a formal self-assessment of compliance with the
PSIAS. The Quality Assurance Improvement Plan was provided to the Audit & Scrutiny
Committee, with ongoing compliance being reported in subsequent years. 
6.4.5 Moray Council’s Internal Audit Service fully conforms with Standard 1300 on Quality
Assurance and Improvement Programme. 
7. SECTION E – PERFORMANCE STANDARDS 
Performance Standards describe the nature of the internal audit services being
provided and provide criteria against which the performance of an internal audit
function can be measured. 
7.1 2000 - Managing the Internal Audit Activity 
The chief audit executive must effectively manage the internal audit activity to ensure it
adds value to the organisation.  The internal audit activity is effectively managed when
it achieves the purpose and responsibility included in the internal audit charter, it
conforms with the PSIAS, its individual members conform with the Code of Ethics and
the PSIAS and it considers trends and emerging issues that could impact the
organisation.  The internal audit activity adds value to the organisation and its
stakeholders when it considers strategies, objectives and risks; strives to offer ways to
enhance governance, risk management, and control processes; and objectively
provides relevant assurance. 
7.1.1  An annual Internal Audit Plan is compiled by the Chief Audit Executive outlining the
planned programme of work to be undertaken.  A review is undertaken of the Audit
Universe, taking account of internal audit risk assessment and historic internal audit
activity over a 5 year period. Consideration is given to the Corporate Risk Register
(compiled by Heads of Services supported by the Business Continuity and Risk
Management Officer), as well as corporate transformation and improvement plans. The
Corporate Management Team, Heads of Services, Council Leader and the Chair of the
Audit and Scrutiny Committee are also consulted and asked if there are any projects
they want to be included in the Annual Audit Plan. Contact is made with the External
Auditor to detail the projects contained within the Audit Plan. 
7.1.2 The draft Internal Audit Plan is presented to the Audit & Scrutiny Committee for formal
approval. 
7.1.3 Progress towards completion of the Internal Audit Plan, and the individual audits
contained within it are reported to each Audit & Scrutiny Committee, which routinely take
place five times a year. 
7.1.4 Managers are asked to complete a feedback questionnaire from the reviews undertaken,
which is assessed to determine whether any improvements are needed to the audit
process.   
7.1.5 Moray Council’s Internal Audit Service fully conforms with Standard 2000 on Managing
the Internal Audit Activity. 
Page 287

Page 288

9 
7.2 2100 - Nature of Work 
The internal audit activity must evaluate and contribute to the improvement of the
organisation’s governance, risk management, and control processes using a systematic,
disciplined, and risk-based approach. Internal audit credibility and value are enhanced
when auditors are proactive and their evaluations offer new insights and consider future
impact. 
More specifically, the internal audit activity must assess and make appropriate
recommendations to improve the organisation’s governance processes, evaluate the
effectiveness and contribute to the improvement of risk management processes and
assist the organisation in maintaining effective controls by evaluating their efficiency and
effectiveness and promoting continuous improvement. 
7.2.1 The Chief Audit Executive includes an appropriate balance of work within the Plan to
evaluate and contribute to the improvement of the Council’s governance, risk
management and control processes. Findings re coverage of governance, risk
management and control processes.   
7.2.3 Moray Council’s Internal Audit Service fully conforms with Standard 2100 on Nature of
Work. 
7.3 2200 - Engagement Planning 
Internal auditors must develop and document a plan for each engagement, including the
engagement’s objectives, scope, timing and resource allocations. The plan must
consider the organisation’s strategies, objectives and risks relevant to the engagement. 
The CIPFA Local Government Application note states that for each engagement, a brief
should be prepared, discussed and agreed with relevant managers. The brief should
establish the objectives, scope and timing for the assignment and its resource and
reporting requirements. Audit work should be undertaken using a risk-based audit
approach. 
7.3.1 The Audit Plan includes a brief summary of the scope for each audit, which is developed
more fully prior to the commencement of the audit. The audit programme is compiled by
the auditor and is reviewed by the Chief Audit Executive or Senior Auditor to ensure that
the programme is consistent with, and will provide sufficient evidence for arriving at an
opinion on, the agreed scope. 
7.3.2 Moray Council’s Internal Audit Service fully conforms with Standard 2200 on
Engagement Planning. 
7.4 2300 - Performing the Engagement 
Internal auditors must identify, analyse, evaluate and document sufficient information to
achieve the engagement’s objectives. 
At each stage of the audit, auditors should consider what specific work needs to be
conducted and evidence needs to be gathered to achieve the engagement objectives
and support an independent and objective audit opinion.  Systems should be in place to
ensure that auditors obtain and record, within the working papers, sufficient evidence to
support their conclusions, professional judgements and recommendations.  Working
papers should always be sufficiently complete and detailed to enable an experienced
internal auditor with no previous connection with the audit to ascertain what work was
performed, re-perform it if necessary and support the conclusions reached.  The CAE
should also specify how long all audit documentation should be retained, whether held
on paper or electronically.  All audit work should be subject to an appropriate internal
quality review process. 
Internal auditors must be alert to the possibility of intentional wrongdoing, errors and
omissions, poor value for money, failure to comply with management policy and conflicts
Page 288

Page 289

10 
of interest when performing their individual audits. They must also have sufficient
knowledge to identify indicators that fraud or corruption may have been committed. 
7.4.1 The Internal Audit Manual details the procedures for use within Moray Council’s Audit
Service. The Manual is supported by the Pentana system, which is an audit automation
tool supporting the service’s management and control workflow.   
7.4.2 All audit files are stored electronically within Pentana.   
7.4.3 Evidence for file and report reviews, which are undertaken by the Chief Audit Executive
or the Senior Auditor, is retained within Pentana. 
7.4.5 Records management arrangements are appropriate and consider GDPR.           
7.4.6 Moray Council’s Internal Audit Service fully conforms with Standard 2300 on
Performing the Engagement. 
7.5 2400 - Communicating Results 
The basic aims of every internal audit report should be to: 
• give an opinion on the risk and controls of the area under review, building up to the
annual opinion on the overall adequacy and effectiveness of the organisation’s
framework of governance, risk management and control;
• prompt management to implement the agreed actions for change leading to
improvement in the control environment and performance; and
• provide a formal record of points arising from the audit and, where appropriate, of
agreements reached with management, together with appropriate timescales. 
Each report should include the scope and purpose of the audit to help the reader to
understand the extent, or limitations, of the assurance(s) provided by the report.  During
the course of the audit, key issues should be brought to the attention of the relevant
manager to enable them to take corrective action and to avoid surprises at the closure
stage.  Before issuing the final report, the internal auditor should normally discuss the
contents with the appropriate levels of management to confirm the factual accuracy, to
seek comments and to confirm the agreed management actions. A draft report is useful
for this purpose.  Recommendations should be prioritised according to risk. The
recommendations and the resultant management action plans should be agreed prior to
the issue of the final report.  Any areas of disagreement between the internal auditor and
management that cannot be resolved by discussion should be recorded in the action
plan and the residual risk highlighted.  Those weaknesses giving rise to significant risks
that are not agreed should be brought to the attention of a more senior level of
management and the board. 
As set out in the PSIAS, the CAE must deliver an annual internal audit opinion and report
that can be used by the organisation to inform its annual governance statement. This
must include the annual internal audit opinion concluding on the overall adequacy and
effectiveness of the organisation’s governance, risk and control framework, a summary
of the audit work from which the opinion is derived (including reliance placed on work by
other assurance bodies); and a statement of conformance with the PSIAS and the
results of the internal audit QAIP. 
7.5.1 Draft reports are prepared for each audit assignment by the lead auditor and reviewed
by the Chief Audit Executive or Senior Auditor. This includes assessing the strength of
controls in place within the audited area. 
7.5.2 Once factual accuracy has been confirmed with the service being audited, the action
plan is completed, with any issues being addressed with the relevant Head of Service
before the report is passed for presentation to the Audit & Scrutiny Committee. 
Page 289

Page 290

11 
7.5.3 The work of the Internal Audit service for the year is considered, summarised and forms
part of the overall opinion that is provided annually by the Chief Audit Executive.   
7.5.4 Engagement with stakeholders during the validation of the EQA confirms that this
process is understood, respected and valued by the organisation. 
7.5.5 Moray Council’s Internal Audit Service fully conforms with Standard 2400 on
Communicating Results. 
7.6 2500 - Monitoring Progress 
The PSIAS place responsibility for monitoring progress with the CAE to ensure that
management actions have been effectively implemented or, if not, that senior
management have accepted the risk of not taking action.  The CAE must, therefore,
implement a follow-up process for ensuring the effective implementation of audit results
or ensuring senior management are aware of the consequences of not implementing an
action point and are prepared to accept the risk of such consequences occurring. The
results of this process should be communicated to the board.  The CAE should develop
escalation procedures for cases where agreed actions have not been effectively
implemented by the date agreed. These procedures should ensure that the risks of not
taking action have been understood and accepted at a sufficiently senior management
level. The effective involvement of the board in the follow-up process is critical to
ensuring that it works. The CAE should consider revising the internal audit opinion in
light of findings from the follow-up process.  The findings of follow-up reviews should
inform the planning of future audit work. 
7.6.1 The audit follow-up review process is documented within the Internal Audit Manual.
Follow-up audits take place following the last date of implementation for all
recommendations. A control record is maintained to monitor when audits are due for
follow up. Follow-up audits are reviewed by the CAE or Senior Auditor, following which
they are now reported to Audit & Scrutiny Committee. 
7.6.3 Moray Council’s Internal Audit Service fully conforms with Standard 2500 on
Monitoring Progress. 
7.7 2600 - Communicating the Acceptance of Risks 
When the chief audit executive concludes that management has accepted a level of risk
that may be unacceptable to the organisation, they must discuss the matter with senior
management. If the chief audit executive determines that the matter has not been
resolved, they must communicate the matter to the board. It is not the responsibility of
the chief audit executive to resolve the risk. 
7.7.1 All audits on systems and practices are reported to the Board including Management
responses to recommendations. Where a recommendation is made which is not
accepted by management, which has been found to be rare, the Chief Audit Executive
presents a report to Audit & Scrutiny Committee where a ‘no’ response has been entered
against a recommendation, the CAE and elected members would have the opportunity
to challenge this response from Management.   
7.7.2 The organisational structure allows for direct communication between the Chief Audit
Executive and the Chief Executive and the Chair of the Audit & Scrutiny Committee.   
7.7.3 The full scope of internal audit responsibilities are covered in the annual report / opinion
i.e. governance, risk management and control.   
7.7.4 Moray Council’s Internal Audit Service fully conforms to the Standard on
Communicating the Acceptance of Risk. 
Page 290

Page 291

12 
Jackie Clark 
Chief Internal Auditor
Perth & Kinross Council
August 2024
Page 291

Page 292

13 
APPENDIX A – SUMMARY OF ASSESSMENT 
REF PAGE
No. ASSESSMENT AREA
Fully
Conforms 
Generally
Conforms 
Partially
Conforms 
Does Not
Conform 
Section A  Mission of Internal Audit and Core Principles    
Section B  Definition of Internal Auditing    
Section C  Code of Ethics    
Section D  ATTRIBUTE STANDARDS 
1000  Purpose, Authority and Responsibility    
1100  Independence and Objectivity    
1200  Proficiency and Due Professional Care    
1300  Quality Assurance and Improvement Programme    
Section E  PERFORMANCE STANDARDS 
2000  Managing the internal Audit Activity    
2100  Nature of Work    
2200  Engagement Planning    
2300  Performing the Engagement    
2400  Communicating Results    
Page 292

Page 293

14 
2500  Monitoring Progress    
2600  Communicating the Acceptance of Risks    
TOTALS 13 1 0 0
Page 293

Page 294

15 
APPENDIX B – EVIDENCE PACK
• Completed self-assessment against the Public Sector Internal Audit Standards
• Internal Audit Charter
• Internal Audit Manual
• Pentana system outputs
• Organisational charts, Job descriptions
• Links to relevant Committee reports
• Relevant communication 
Page 294

Page 295

16 
APPENDIX C – STAKEHOLDERS 
Stakeholder interviews were held with the following key members of staff and Elected
Members:
• D Lewis, Audit & Risk Manager (Chief Audit Executive)
• T Laing, Senior Internal Auditor
• J Lovie, Internal Auditor
• R Burns, Chief Executive (former)
• A McEachan, Head of Governance, Strategy & Performance
• Councillor G Leadbitter, Chair of Audit & Scrutiny Committee
Page 295

Page 296

17 
APPENDIX D – ACTION PLAN
ACTION PLAN – INTERML AUDIT FOLLOW UP REVIEW – JUNE 2025 
No.  Report
Para  Recommendation  Management Response  Responsible
Officer / Agreed
Completion Date
1 6.2.5 There is scope for improving clarity regarding reporting
lines by explicitly stating reporting lines within the Audit
Charter
The Audit Charter will be updated to provide greater
clarification regarding the rights of access for Internal
Audit Section officers to documentation and to seek
explanations from any officer regarding any issues in
completing their duties
Audit and Risk
Manager / Agreed 30
November 2024
Follow Up Review
Status Comment 
Implemented 
The Internal Audit Charter has been updated to include further reference to the administrative and functional reporting
requirements of the Audit & Risk Manager (Chief Audit Executive (CAE)). In addition, greater clarity has also been
included regarding the Audit and Risk Manager’s “rights of access” to members and senior management. The Audit and
Scrutiny Committee approved the updated Audit Charter on 20 November 2024 (paragraph 10 of the minutes refers). 
No.  Report
Para  Recommendation  Management Response  Responsible
Officer / Agreed
Completion Date
2 6.2.6 Furthermore, there is scope to consider the Chief Audit
Executive’s delegated authority within the Scheme of
Delegation
The Scheme of Delegation will be updated to include the
responsibility for the Audit and Risk Manager to act as the
Head of
Governance,
Strategy and
Page 296

Page 297

18 
Chief Audit Executive for the delivery of internal audit
services.
Performance /
Agreed 31 January
2025
Follow Up Review
Status  Comment
Implemented The Scheme of Delegation has been updated to include reference to the requirement for the Audit and Risk Manager’s
responsibility to deliver the internal audit service in accordance with the Public Sector Internal Audit Standards. The
updated Scheme of Delegation was approved by full Council on 25 June 2025.   
No.  Report
Para  Recommendation  Management Response  Responsible
Officer / Agreed
Completion Date
3 6.2.7 Where the Chief Audit Executive has roles and
responsibility in addition to Internal Audit, this should be
clearly communicated to the Audit & Scrutiny
Committee and Senior Officers. The Audit Charter
should be updated in this regard to ensure that there are
clear arrangements for ensuring the independence and
objectivity of the Int The updated Audit Charter was
approved by the Audit and Scrutiny Committee on 20
November 2024 (paragraph 10 of the minutes
refers).ernal Audit function.
As detailed in the ‘management response’ to
recommendation 1, the Audit Charter will also be updated
to detail the separate roles of the Audit and Risk Manager
within the Council.
Audit and Risk
Manager / Agreed 30
November 2024
Follow Up Review
Status  Comment
Implemented The Internal Audit Charter has been updated to include reference of the requirement that any duties of the Audit and
Risk Manager that fall outside internal auditing must not impact the requirement for independence or objectivity. 
Page 297

Page 298

19 
No.  Report
Para  Recommendation  Management Response  Responsible
Officer / Agreed
Completion Date
4 6.3.7 Consideration should be given to the size of the Internal
Audit team in order to ensure that the Internal Audit
Service meet its objectives for all organisations that it
provides internal audit services to (as detailed in 6.3.2)
Concerns regarding the current staffing resources of the
Internal Audit Service to meet the auditing and also
counter fraud requirements of the Council and partner
organisations have already been highlighted to senior
management and members.  However, this issue will be
raised again for consideration with senior management.
Audit  and Risk
Manager / Agreed
30 September 2024
Follow Up Review
Status  Comment
Part- Implemented  In accordance with the Public Sector Internal Auditing Standards (PSIAS), the Audit and Risk Manager must ensure that
internal audit resources are appropriate and sufficient. Where the Audit and Risk Manager believes that the level of
resources will adversely impact the provision of the annual internal audit opinion, this must be brought to the attention
of the Audit and Scrutiny Committee. Concerns were raised by the Audit and Risk Manager within the Annual Internal
Audit Report to the Audit and Scrutiny Committee on 24 June 2025 (paragraph 6 of the minutes refers) regarding the level
of staff resources. However, the recent appointment of a part-time temporary auditor should assist in meeting the
increasing demands on the Service.
.  
Critical 
Significant 
Routine 
Page 298

Page 299

REPORT TO:     MORAY INTEGRATION JOINT BOARD AUDIT AND PERFORMANCE
COMMITTEE ON 29 OCTOBER 2025 
SUBJECT: HEALTH AND SOCIAL CARE MORAY STRATEGIC DELIVERY PLAN
2025-2028 – PROGRESS UPDATE TO 30 SEPTEMBER 2025 
BY:  CORPORATE PROGRAMME MANAGER 
1. REASON FOR REPORT 
1.1 To provide the Committee with an update on progress on delivery of the to
scrutinise the progress to September 2025 of the implementation of the Strategic
Delivery Plan (SDP). 
2. RECOMMENDATION 
2.1 It is recommended that the Committee:- 
i) consider and note the progress to September 2025 of the Strategic
Delivery Plan (2025-2028) attached at Appendix 1; 
ii) note the areas that are progressing well and those where adjustments
to timescales are required as outlined in 4.3 to 4.10; and 
iii) approve amendment to the outcome identified in 4.11 
3. BACKGROUND 
3.1 The Public Bodies (Joint Working) (Scotland) Act 2014 places a duty on Integrated
Authorities to develop a Strategic Plan for delegated functions under their
direction. As reported to the Board on 24 November 2022 (paragraph 13 of the
minute refers), the revised strategic plan ‘Partners in Care 2022-2032’ was
approved to allow for the Strategic Delivery Plan (SDP) to be developed. 
3.2 The Strategic Delivery Plan 2025 to 2028 was agreed by the Board on 29 May 2025
(para 8 of the minute refers) and set out how the Strategy will be delivered,
highlighting the key improvements and transformational change which will be
required. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
Item 13.
Page 299

Page 300

4.1 The progress updates for the projects in the SDP are set out in Appendix 1. Of the
66 actions, 55 are on schedule (or not due to have started), four are behind, three
are overdue and four have completed. 
Completed
4.2 2.2.1 – 2.2.2 Primary Care Improvement Plan – actions specified are completed
but will continually be subject to ongoing review through the project board. Other
completed actions are the contribution to the development of the Moray wide
poverty Strategy Action plan (1.2.1) and definition of requirements for older people
supported accommodation (5.4.2) has been incorporated into the Local Housing
Strategy. 
Progress delayed or overdue
4.3 Locality Plans – changes in staffing following retirals has meant progress is slower
than anticipated, it is now underway however there is a need to extend the due
date to December 2025. 
4.4 Good progress with development of the SDS framework on Scotland Excel Self
Directed Support (SDS) (3.2.1) but a delay has occurred regarding the mechanism
to publish the framework to ensure it remains a live advert. Consideration of
options to ascertain the most appropriate solution is underway. The timeline
needs to be slightly extended by a month to January 2026. In relation to the self-
evaluation against the national SDS framework (3.2.2) progress has been delayed
due to lack of a lead, which has now been resolved through the funding for
Internal Audit Team to support this. 
4.5 The strategic review and redesign of care at home service 5.2.1 has progressed
with the development of the commissioning framework that is enabling more
providers to participate in the provision of care. There is work to be completed
regarding data sharing governance, and this is being progressed with support from
Council Information Governance team. 
4.6 The review and redesign of Adults Day Care services is underway but progressed
has been hampered by competing priorities and lack of project support. This is
also impacting on delivery of budget savings, although alternative savings have
been identified for implementation this financial year. A project officer has now
been appointed, and this project will be a priority to progress, however the
timeline requires to move from March to December 2026 to allow time for
appropriate engagement with stakeholders. 
4.7 Progress on the Children Service Plan is reported to Girfec Leadership Group on a
quarterly basis, and some highlights are incorporated into this update. In relation
to Family Support (action 2.5.6) wider children services collaboration is required
to deliver on the whole system change and family support centre and spoke
models. The Head of Service, Children’s, Families and Justice services is
considering and will bring forward proposal in due course. 
4.8 The rollout of the engagement plan for the GMED redesign was delayed due to
limited operational capacity and the complexity of the review process.
Page 300

Page 301

Engagement will complete in January 2026 with the revised service model
presented to MIJB in March 2026. 
4.9 Work has commenced on the revised communications strategy (E3.1) to ensure
the document reflects statutory principles, including “Planning with People,” and
aligns with relevant HSCP communications and engagement guidance. Revised
date for draft document completion is from September to December 2025. 
4.10 The annual report Annexe A was completed via NHSG and the HSCM workforce
plan is underway but was delayed whilst waiting for Scottish Government
response to Annexe A, to be able to proceed. This has now been received and the
information from the KPMG report for NHSG will also be incorporated in our plan,
which will be completed in March 2026. 
Amendment to outcome proposed
4.11 In relation to reducing reoffending, following feedback from MIJB regarding
responsibility for housing it is proposed to replace the previously agreed “Less
homelessness applications are made by people released from prison” with “More
people are supported by throughcare services upon release from prison”.  This is
within the Scottish Government Community Justice Outcomes – Improvement
Planning (CJOIP) and is more aligned with the health and social care Moray’s
services and activities. 
Further Development
4.12 Working is progressing on the performance framework and the governance
framework to support oversight of the project progression, evidencing impact and
improvement in outcomes for people. Whilst progress has been made it is not yet
completed so the revised framework will now be presented to this Committee in
February 2026. As part of this framework, we aim to adopt exception reporting
through strengthening establishment of clear milestones and SMART objectives. 
4.13 Given the ongoing budgetary pressures, the Senior Management Team (SMT) will
be scrutinising progress with SDP and the budget savings projects to ensure that
the focus is on financial sustainability. The need to prioritise resource allocation
to key savings projects may impact on progress on some other SDP actions over
the next 6 months however any necessary amendments in timescales will be
managed and reported in the next update. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint Board
Strategic Plan “Partners in Care 2022 – 2032”
The SDP underpins the named plans and supports achieving better
outcomes for citizens in Moray. 
(b) Policy and Legal
Page 301

Page 302

The implementation and publication of the delivery plan ensures the MIJB
complies with legal requirements. Delivery of aspects of the plan will
require review of policies and procedures and these will be taken forward
through the necessary governance processes to ensure compliance with
statutory requirements. 
(c) Financial implications
Pivotal to the effective delivery on the actions in the SDP are the financial
resources available to MIJB. To assist with the planning process, a
Medium-Term Financial Framework supports the delivery of the strategic
plan to aid decision making. This is scrutinised regularly by Senior
Management and reported quarterly to MIJB. The Budget Savings Oversight
Group regularly monitors the progress of projects regarding delivery of
budget savings to ensure anticipated savings are achieved. 
(d) Risk Implications and Mitigation
Risks to achieving the deliverables in the plan will be highlighted through
the Strategic Risk Register and monitored by this Committee. The
immediate risk to successfully delivering the Plan could be defined as
Intensification – trying to do more with the same (e.g. financial resources,
workforce availability). To mitigate against this, the MIJB at their meeting on
29 June 2023 (para 10 of the minute refers) agreed the 3-year
transformation priorities and improvement projects; to offer a clear focus
for Health and Social Care Moray (HSCM) staff and these priorities are
incorporated in the SDP. Each service/team will have or will develop
service plans that encompass their responsibilities contained in the SDP.
This supports good governance, risk and issue escalation if required. 
(e) Staffing Implications
With any changes in ways and models of working, there may be
implications for staff in how they go about their work and how supported
they are within a pressured and changing environment. Staff side, Unions
and Human Resources will be working alongside SMT in delivering change,
observing the associated policy and procedures of the Council and NHS
Grampian (NHSG). The SDP will be delivered using existing staffing. That
said, as a saving target has been agreed though vacancy management, the
MIJB must be cognisant of the health and wellbeing of the workforce as
they continue to deliver and transform in a resource constraint
environment. 
(f) Property
The Moray Infrastructure Board offers oversight and scrutiny to service
delivery, linking into the assets management arrangements for NHSG and
Moray Council. Service specific infrastructure and property issues will be
detailed in service plans and risks raised through the Infrastructure Board
and Strategic Risk register is appropriate. 
(g) Equalities/Socio Economic Impact
Page 302

Page 303

An Equality Impact Assessment (including assessment against Fairer
Scotland Duty) was undertaken in line with statutory obligations. This has
been reviewed and there were no changes identified. The EIA was included
as part of the submission for the Strategy Plan agreed by MIJB at their
meeting on 29 November 2022 (para 14 of minute refers) and are available
publicly on HSCM website.  As projects progress, they will undertake
Integrated Impact Assessments that will be reported and published, as
necessary. 
(h) Climate Change and Biodiversity Impacts
There are no direct impacts arising from the recommendations of this
report.
Climate change impacts are considered and incorporated into project
documentation and business plans as HSCM work towards reducing
carbon footprint and delivering on net zero emissions targets. 
(i) Directions
No direction requires to be issued to Moray Council or NHSG as a result of
this report. 
(j) Consultations
Consultations have been undertaken with Senior Management Team and
Caroline O’Connor, Committee Services Officer, Moray Council, and
comments have been incorporated in this report. 
6. CONCLUSION 
6.1 This update on progress of the SDP outlines what is being achieved against
approved priorities, within the capacity and resources currently available. It
provides assurance of actions being undertaken to deliver objectives and that
progress is regularly monitored. The work progressing on the performance
framework will strengthen the links to the Annual Performance Report, where
the impacts and outcomes for the people of Moray will be evidenced. 
Author of Report: Jeanette Netherwood, Corporate Programme Manager 
Background Papers: 20250327 HSCM Strategic Delivery Plan 2025-28 and Appendix 1 
20250130 North East Route Map for Strategic Change Report and
Appendix 
20230928 Strategic Delivery Plan 2023-26 and Appendix 
20230629 Strategic Transformation Plan Report  
20221124 Strategic Plan 2022-2032 Report and Appendix 
Page 303

Page 304

APPENDIX 1
1
Health and Social Care Moray Strategic Delivery Plan 2025-28 
Report Type: Actions Report
Generated on: 17 October 2025 
Action Status 
Cancelled 
Overdue; Neglected 
Unassigned; Check Progress 
Not Started; In Progress; Assigned 
Completed 
Strategic Delivery Plan 2025-2028
1. Building Resilience
1. We focus on prevention and tackling inequality; 1.1 Early Intervention and Prevention
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
STRADPLAN
25-28
Cat1.1.1
LD Health Checks - Annual Health
Checks for people 16+ with a
Learning Disability.
LD Service
Manager 
All people aged 16+ with a
learning disability receive an
annual health check. 
30-Apr-2026
Since the launch of the health check rollout in Moray,
including the initial pilot phase, a total of 220 health
checks have been offered, with 157 completed to date. 
Home visits have been provided for individuals unable to
attend GP surgeries, ensuring equitable access to the
service. Referrals generated through these health
checks have supported timely access to appropriate
services, contributing to improved health outcomes. 
Ongoing monitoring of outcomes and individual
feedback continues to inform and shape future
development. 
50% 
Page 304

Page 305

APPENDIX 1
2
STRADPLAN
25-28
Cat1.1.2
Social Prescribing - Deliver the
Social Prescribing model to all
Moray localities by March 2026.
Health
Improveme
nt (HI)
Team
Leader 
Reduction in targeted service
waiting lists by delivering the
Social Prescribing model to all
Moray localities by March
2026. 
30-Apr-2026
SP model ongoing in Forres and Lossiemouth, which is
currently under review including patient feedback, an
aspect previously missing from evaluation. Maryhill
Practice are interested in implementing a SP model and
the team have presented further information to the
staff. Aim to deliver a pilot at Maryhill with current
resource and the learning taken from this will inform
upscale of SP across Moray. 
15% 
Strategic Delivery Plan 2025-2028
1. Building Resilience
1. We focus on prevention and tackling inequality; 1.2 Poverty Strategy 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
STRADPLAN
25-28
Cat1.2.1
Contribute to development of
Moray wide poverty Strategy and
Action Plan
Locality
Manager
(West)  
By working with partners, we
will raise awareness and work
to reduce the impact of
poverty on people's health
and wellbeing in Moray. 
30-Sep-2025
Initial milestone completed with input to the action plan
from a Health and Social Care perspective. Further
milestones to be defined for monitoring. 100% 
STRADPLAN
25-28
Cat1.2.2
Raising awareness of the Impact
of Poverty on health
HI Team
Leader  
We will increase the number
of frontline staff trained and
confident in speaking about
poverty and referring on for
appropriate support. 
30-Sep-2026
Making every Opportunity Count (MeOC) 
Target is 2 awareness sessions delivered per quarter. 
Awareness sessions refreshed and updated to include
Realistic Medicine principles which offer practical
approaches to enable staff to have conversations. 
Q1 – 3 sessions, 24 attended 
Qualitative data is collected to evaluate frontline staff
confidence. 
Relaunch of the Fairer Moray Forum planned for Nov 25   
25% 
Page 305

Page 306

APPENDIX 1
3
Strategic Delivery Plan 2025-2028
1. Building Resilience
2. We nurture and are part of communities that care for each other; 2.1 Supporting Unpaid Carers 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
Cat2.1.1
Implement actions outlined in the
Unpaid Carers delivery plan
Unpaid
Carers
Strategy
Group 
By Implementing the actions
outlined in the Unpaid Carers
delivery plan we achieve
increased awareness of unpaid
carers with professionals
across health and social care
and within the community. 
31-Mar-2026
This work is planned, sessions taking place in Q3 25/26
with Social Work staff in C&F to discuss young carers,
where to signpost and to raise awareness of the unpaid
carer training on TURAS for staff to access.  
The project with Elgin Health Centre commenced with
evaluation and learning from that will influence how we
role this out to wider GP practices expected during Q3
25/26. 
20% 
HSCM
STRADPLAN
Cat2.1.2
Produce and plan implementation
of the Unpaid Carers Strategy for
2027-2030
Unpaid
Carers
Strategy
Group
By Implementing the actions
outlined in the Unpaid Carers
Strategy we will achieve
increased number of unpaid
carers feel supported in their
caring role. 
31-Mar-2027
Following the extension of the Carers Strategy as
approved at MIJB taking it to March 2028, a revised
implementation plan is being developed and will be
taken to the Carers Strategy Oversight Group in
September 2025 for approval.  
5% 
Strategic Delivery Plan 2025-2028
1. Building Resilience
2. We nurture and are part of communities that care for each other; 2.2 Primary Care Sustainability 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
STRADPLAN
25-28
Cat2.2.1
Provide support and guidance to
PCIP works-streams and GP
practices through transformation
and delivery of the key theme
changes
Primary Care
Development
Manager
GP Clinical
Lead  
Deliver on the 2018 contract
memorandum of
understanding within
allocated budget
31-Jul-2025
At month 3 of financial year 25/26 we are within
budget. We continue to monitor Moray PCIP via our
financial plan. We will be undertaking an in-depth
review at month 6 and this will ascertain the anticipated
year-end and will be the decider for any risks/mitigation
that we need to undertake for the remainder of the
financial year. 
Moray PCIP Board meets monthly with PCIP work
stream to discuss performance, spend, risk & mitigation,
key actions required, and any escalations required. 
100% 
Page 306

Page 307

APPENDIX 1
4
Moray PCIP Board provides guidance on an as and when
required basis to all work stream leads and to GP
Practices for all work streams. 
Moray PCIP Board provides the GP Practices with a
quarterly newsletter providing updates on PCIP
progress. NHSG Project provide updates on GP Vision
progress. 
STRADPLAN
25-28
Cat2.2.2
Provide support and guidance to
GP practice to safeguard
sustainability
Primary Care
Development
Manager
GP Clinical
Lead  
Increased access to support
for GP Practices if they
encounter any sustainability
concerns 
30-Sep-2025
Moray provides support and guidance to GP Practices on
an as and a when required basis. 
In the last quarter in depth support and guidance was
provided to two Moray GP Practices and this support
continues. 
100% 
STRADPLAN
25-28
Cat2.2.3
Support the delivery of the 2018
GMS contract and Memorandum of
Understanding (MOU) for PCIP
Primary Care
Development
Manager
GP Clinical
Lead   
Moray PCIP Plan for 2025-26
is delivered successfully  31-Mar-2026
Vision Programme progressing towards aims and
objectives of 2018 contract and MoU and
implementation of the improvement plan. 
Moray PCIP plan for 2025-26 incorporates all work-
stream service plans as well as financial plan – this has
been completed for 2025/26
50% 
STRADPLAN
25-28
Cat2.2.4
Develop and support opportunities
for flexibility in the contract
Primary Care
Development
Manager
GP Clinical
Lead  
Consideration of local
flexibilities and included
within the GP vision
programme
31-Mar-2026
Moray PCIP plan for 2025- 26 incorporates all work-
stream service plans as well as financial plan – this has
been completed for 2025/26 
Moray PCIP Board meets monthly with PCIP work
stream to discuss and develop and support
opportunities 
Continue to explore opportunities and flexibilities in line
with the work being progressed with the GP Vision
Program
50% 
Page 307

Page 308

APPENDIX 1
5
Strategic Delivery Plan 2025-2028
1. Building Resilience
2. We nurture and are part of communities that care for each other; 2.3 Mental Health Services 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
Cat2.3.1
Mental Health - Early intervention,
prevention, and self-management
Mental
Health (MH)
Services
Manager /
HI Team
Leaders /
MH
Strategic
Lead 
We aim to move towards a
preventative, population
health model which promotes
and sustains good mental
health and wellbeing. 
The community feels they
have social connections,
stronger resilience, worthwhile
community assets and do not
feel isolated. 
People on distress feel happier
with the responses they have
received - both from services
and the wider community. 
31-Mar-2026
New SAMH Commissioned Services are now operational
and fully staffed. The Distress Brief Intervention Service
have provided support for 108 individuals, and the
Intensive Recovery and Community Support Service
have provided support for 85 individuals in the 1st
Quarter 2025. 
Social Prescribing, Realistic Medicine, and Community
Appointment days are being developed/scaled up across
Moray on a Locality basis facilitated by the Health
Improvement Team. The principles of Getting it Right
for Everyone (GIRFE) are being embedded in this work. 
Mental health and wellbeing practitioners are embedded
in GP practices across Moray to offer support and
signposting. In the previous financial year 2,726
appointments were offered with approximately 90%
being from GP Practices. 
The Moray Wellbeing Hub work with Moray residents to
ensure the voice of those with lived experience is
collected, listened to, and fed back through governance
structures to inform service delivery. This information
feedback into the Mental Health Strategic Group. 
Digital Health and Care innovation Centre Living Lab 5 –
mental wellbeing - is developing and testing innovative
solutions to tackle poor mental health and low
wellbeing. The aim is to enhance access to essential
service, promote wellbeing and reduce loneliness. The
main piece of work to date has been the incorporation
of a mental health and wellbeing portal on the Moray
Community Connections site which will enable the public
and staff to access information of local and national
support services. 
Staff in core mental health services have received
trauma informed training.
65% 
Page 308

Page 309

APPENDIX 1
6
HSCM
STRADPLAN
Cat2.3.2
Mental Health Quality Standard 1:
Access
Mental
Health (MH)
Services
Manager /
HI Team
Leaders /
MH
Strategic
Lead 
People in Moray have
equitable and non-
discriminatory access to
effective and relevant support
for their mental health, within
appropriate timescales. 
Increased number of people
able to access the person-
centred support they require
within a reasonable timescale. 
31-Mar-2026
Work has been undertaken to improve pathways for
access to psychological therapies in primary and
secondary care services. 
The inclusion of primary care psychological therapies
team lead at the secondary care psychological therapies
referral meetings has ensured that people are picked up
for assessment and treatment by the most appropriate
team via a step up/step down pathway without the need
for them to go back through their GP. 
Secondary care mental health services are meeting the
18-week referral to treatment target for psychological
therapies with 100% of people referred starting
treatment in September 2025. This is due to a variety of
factors but the establishment of groups within the
service has played a significant part in this. 
Primary care psychological therapies are struggling to
meet the demand with only 15% of people starting
treatment in September 2025. Referrals are being
screened to ensure they meet the criteria for the
service, but further work is needed to address the
lengthy waiting lists.
60% 
Strategic Delivery Plan 2025-2028
1. Building Resilience
2. We nurture and are part of communities that care for each other; 2.4 Promoting third sector and community services to enable people to manage
their own physical, social, and mental well-being 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
Cat2.4.1
Build the infrastructure and
capacity in the community to
support people to self-manage.
All Service
managers /
Commissioni
ng Team 
Increased third sector
representation in all
appropriate service redesign
or contract reviews. 
31-Mar-2026
Commissioning activity involves third sector and lived
experience representatives via PINs, service reviews,
monitoring, contract meetings, strategy groups, and
forums. The Commissioning Team’s work is underpinned
by engagement and collaboration with third sector
providers. This is all embedded in the Commissioning
Procedure. 
30% 
Page 309

Page 310

APPENDIX 1
7
HSCM
STRADPLAN
Cat2.4.2
Increase resilience, sustainability,
and growth of our own groups and
third and community led groups
across Moray
Community
Wellbeing
Developmen
t Team 
Increased number of resilient
community led groups and
partnerships supporting
mental and physical wellbeing,
prevention, and enablement in
Moray. 
30-Jun-2026
• All current 18 Be Active Life Long (BALL) groups
continue to be supported to be self-managed and
resilient. Continue to work with the BALL forum, which
is still in its infancy with the aim of eventually being an
umbrella support for BALL Committee members. 
• 4 Seated Exercise and Tea (SET) groups continue to
be supported, with 3 now fully established and 1 new
group developed on track to become sustainable. 
• 10 local community groups continue to receive light
touch support when needed. 
• 5 sessions run in partnership with Wild things with
over 50 participants. 
• Continue to work in collaboration with Dance North –
have delivered 2 open exercise sessions for the wider
community reach in the last quarter. 
• Working in collaboration with the Health Improvement
Team- to deliver MEOC workshops to each of our 18
BALL group members, with 3 delivered in the last
quarter. 
• Processed and triaged c.500 enquiries from across
HSCM services and the wider community for
information, signposting, and places on our existing
groups. 
75% 
Strategic Delivery Plan 2025-2028
1. Building Resilience
2. We nurture and are part of communities that care for each other; 2.5 Children Service plan 2023-2026
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
Cat2.5.1
Delivery of the 6 improvement
priorities - 1
Head of
Service /
Chief Social
Work Officer
(CWSO) 
Improved outcomes for looked
after and care experienced
young people
31-Mar-2026
Corporate Parent self-evaluation toolkit to quality assure
information system has been introduced in Secondary
Schools.
Health assessments of looked after children coming into
care have 81% completion within four, weeks against a
target of 100%
Recruitment campaigns for Foster Carers have been
stepped up. Currently 36 fostering households with 18
40% 
Page 310

Page 311

APPENDIX 1
8
enquiries leading to 5 progressing to assessment in Qtr
1 & 2
New framework and support guidance around
maintaining relationships of care experienced children
and young people has been completed with launch date
October 2025
HSCM
STRADPLAN
Cat2.5.2
Delivery of the 6 improvement
priorities - 2
Head of
Service /
Chief Social
Work Officer
(CWSO) 
Tackling child poverty 31-Mar-2026
Cost of school day guidance was issued to all schools in
June 2025 and is available on Moray Council website.
Housing initiatives to avoid homelessness have
successfully prevented 3 families with disabilities being
made homeless.
57 Parental Employability referrals received to
September – an increase of 50% in referral rate
compared to previous year. 118 new referrals for young
people (16+) with 98 positive outcomes.
Additional funding of £54k secured to provide breakfast
clubs for children.
30% 
HSCM
STRADPLAN
Cat2.5.3
Delivery of the 6 improvement
priorities - 3
Head of
Service /
Chief Social
Work Officer
(CWSO) 
Supporting children and
families who experience
challenges due to
disability/neurodiversity
31-Mar-2026
Significant engagement with parents and carers through
a survey received 781 responses. 10 themes were
identified and considered by Education, Children’s, and
Leisure Committee of Moray Council in September 2025.
Regular meetings are being established with parent
support group to take improvement proposals forward. 
50% 
HSCM
STRADPLAN
Cat2.5.4
Delivery of the 6 improvement
priorities - 4 
Head of
Service /
Chief Social
Work Officer
(CWSO) 
Keeping children safe 31-Mar-2026
Learning reviewer training completed and individual
reviews underway, outcomes of which will underpin the
learning culture.
Advocacy report services in place and actively
supporting children experiencing child protection
process ensuring the child’s voice is heard.
Online safety programme delivered in Schools and with
parents and professionals covering consent, gender
equality, and health relationships aiming to raise
awareness and keep children and young people safe
when online. 
80% 
HSCM
STRADPLAN
Cat2.5.5
Delivery of the 6 improvement
priorities - 5 
Head of
Service /
Chief Social
Work Officer
(CWSO) 
Improving emotional and
mental wellbeing 31-Mar-2026
Moray wide parent focused support service has been
established to support parents/carers to understand and
support their children’s mental health and wellbeing
needs. Of parents accessing the service 87% have
reported an increase in their confidence and skills to
support their children’s mental health.
60% 
Page 311

Page 312

APPENDIX 1
9
Procurement completed for a new community mental
health service for children from 5 years upward, with
SAMH the successful provider. 
HSCM
STRADPLAN
Cat2.5.6
Delivery of the 6 improvement
priorities - 6 
Head of
Service /
Chief Social
Work Officer
(CWSO) 
Strengthening family support 31-Mar-2026
Family support ranging from prevention to intensive
family support has increased, with 22 groups running
every week (compared to 10 groups last year). In last
two quarters 13 new volunteers have been trained to
support delivery. 
Commissioned services have been embedded to support
families with intensive support requirements – currently
supporting 53 families. Evaluation of the outcomes of
this work will be undertaken as part of the wider family
support offer. At this stage it is felt that more capacity
is required to deliver a whole system change and family
support centre and spoke model. 
25% 
Strategic Delivery Plan 2025-2028
1. Building Resilience
2. We nurture and are part of communities that care for each other; 2.6 Provision of a Sustainable Locality Model 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
Cat2.6.1
Establish Locality plans for all
areas
Locality
Managers 
Locality plans will be refreshed
and have action plans that
capture the work being
undertaken and planned
across HSCM specific to the
Locality, alongside any other
specific work being
undertaken in that Locality. 
30-Sep-2025
Locality Plans in process of being refreshed. 
Action plans being developed for the next 3 years in line
with and pulling from the HSCM Strategy and Strategic
Delivery Plan once completed.  
Specifics to each locality not covered in the Strategic
Delivery Plan, but in line with our strategic direction, will
be added to the Action Plan  
25% 
HSCM
STRADPLAN
Cat2.6.2
Communities involved in
monitoring effectiveness of local
service delivery
Locality
Managers 
HSCM Teams working across
Moray will ensure that the
people using our services,
their families and unpaid
carers are central to services
and involved in line with
30-Sep-2026
GIRFE being rolled out to teams (See GIRFE Section) 
Home First is being progressed and encompasses a lot
of the work being done across and impacting on
localities. 
20% 
Page 312

Page 313

APPENDIX 1
10
GIRFE Principles and that
there is consultation and
involvement opportunities for
the wider community around
new, changing or evolving
services and opportunities.  
PCIP work feeding into Localities via GP Practice 
Community Conversations and information days being
planned with first one being run in Burghead 30th Oct
2025. 
HSCM
STRADPLAN
Cat2.6.3
Multi-Disciplinary Teams will be
embedded in all localities
Locality
Managers 
To develop a comprehensive
framework for mapping,
aligning and optimising MDTs
across Moray with a focus on
community teams. This work
will support HSCM principles
and priorities and align with
key strategic drivers: 
Home First Improvement
Programme, the HSCM
Strategic Plan ‘Partners in
Care’ and the GIRFE
approach. 
30-Jun-2026
MDT Mapping has begun, and data is being collated. A
variety of MDT meetings are being attended and key
members consulted with. (Also monitoring MDT work
currently being done in DGH/Community Hospitals to
align). 
10% 
Strategic Delivery Plan 2025-2028
2. Home First
3. We work together to give you the right care in the right place at the right time; 3.1 Discharge without Delay (DwD) 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
Cat3.1.1
Discharge to Assess
(D2A)/HomeFirst
NHS OT
Lead
Avoidance of unnecessary
admissions: - Reduction in
unnecessary admissions from
Emergency Department,
AMAU and CDU 
Increase number (and
percentage) of people re-
abled through D2A/START
process within 12-week target  
31-Dec-2025
D2A team and START will be working collaboratively
under the enhanced D2A (home assessment) pathway
which will be in place October 2025. 
This is one of the 4 DWD work streams which have
national and local meetings that we are participating in. 
Phase one of DWD is complete. 
10% 
HSCM
STRADPLAN
Cat3.1.2
Community Hospital and Step
Down Rehabilitation Units
Professional
lead OT /
Team
Manager
To be” status designed, and
action plan developed and
approved  31-Dec-2026
Locally, this project will commence under home
assessment pathway October 2025. This is part of the
national DWD work stream. National and local meetings
are ongoing. 
10% 
Page 313

Page 314

APPENDIX 1
11
(Independe
nt Living) 
Changes identified in plan are
implemented 
Avoidance of unnecessary
admissions: - Reduction in
unnecessary admissions from
Emergency Department,
AMAU and CDU 
The average Community hospital stays in Q1 was 81
days. Days spent in hospital is closely monitored as part
of the delayed discharge focus and this average should
reduce. 
Occupancy for quarter one remained at 99.8%  
HSCM
STRADPLAN
Cat3.1.3
Frailty at Front Door Claire Power
(DGH) 
Increased number of
pathways completed and
communicated 
Increased number of
assessments for support (inc
care) undertaken in the home  
31-Mar-2026
Redesign at the front door of Dr Grays is ongoing with
the successful bid that will see enhanced pathways to
create a discharge lounge and AHP in the emergency
department. First review expected December 2025.
DGH lead on this DWD work stream. 
Presently 23% of our delays are in acute. 8/35. This
changes frequently. 
10% 
HSCM
STRADPLAN
Cat3.1.4
Planned Date of Discharge (PDD)
process and Integrated Discharge
Teams
Lead Nurse 
Increase in % (and number)
of compliant PDD (target to be
defined)  
31-Dec-2026
Phase two of Discharge without Delay has commenced.
Compliance at present is DGH 77%, Seafield 41%,
Stephen 100% and Turner 93%. Dr Gray’s has
successfully bid for additional staffing for the discharge
pathway. Home assessment pathway will influence
Moray’s outcomes, bearing in mind DWD is a national
programme. 
10% 
Strategic Delivery Plan 2025-2028
2. Home First
3. We work together to give you the right care in the right place at the right time; 3.2 Promotion of Self Directed Support (SDS) Options 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
Cat3.2.1
Develop SDS Framework for
options 1, 2 & 3 providers
SDS Officer
/
Procuremen
t Officer MC,
Provider
Services
Manager 
Increased choice and control
for individuals through SDS
Options, driven by individual
preference opposed to market
availability. 
Social work processes and
assessment align with the
principles of SDS  
31-Dec-2025
The specification for the framework has been developed,
and a PIN was published on PCS. Meetings were held
with interested providers week 23/06/2025 with
representatives of HSCM. Commissioning lead is now
consulting with procurement and SXL to establish the
most efficient way to publish the framework to ensure it
remains a live advert enabling new providers to be
onboarded timeously. Progress is delayed whilst
assessment undertaken to ascertain the most
appropriate route for this. 
20% 
Page 314

Page 315

APPENDIX 1
12
HSCM
STRADPLAN
Cat3.2.2
Self-evaluation against national
SDS framework of standards to
inform future requirements to
improve performance and delivery
SDS
Steering
Group 
Conduct self-evaluation 
Identify areas of improvement 
Develop robust
implementation plan to
improve practise and peoples
lived experience of accessing
SDS. 
Internal process will align with
the national vision for SDS. 
Social work process and
assessment and
commissioning activity will
align with the principles of
SDS. 
31-Aug-2025
Work on this has been delayed due to the need to
establish the lead person to take this forward. The SDS
Standards Steering Group has agreed that it would be
beneficial for this to be led by our internal audit team. It
has been confirmed 01/10/25 that funding has been
agreed to support internal audit and conversation will
take place in due course to move this piece of work
forward. 
20% 
HSCM
STRADPLAN
Cat3.2.3
Continue promotion of
independent support and advise
for SDS options
SDS
Steering
Group 
Individuals will have access to
independent support and
advice enabling them to make
informed decisions around the
four options of SDS. 
Individuals will have access to
independent SDS Advocacy to
support with accessing SDS. 
31-Mar-2028
The work to promote the use of the Support in the Right
Direction (SiRD) projects in Moray continues. 
The SDS team, in support of the SiRD project with
Cornerstone are starting to host monthly drop-in
sessions through a mixture of online and in person
sessions to support those in receipt of an SDS Option 1
(DP), to discuss the mechanics of those interested in
utilising an option 1. The independent support advisor
from the SIRD project will also be in attendance to
discuss all SS Options available, and sessions could be
developed for those moving forward following evaluation
of the session to be held on 6th November 2025. 
10% 
Strategic Delivery Plan 2025-2028
2. Home First
4. We help build communities where people are safe; 4.1 Managing frailty in the community 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
Cat4.1.1
Identification and assessment of
frailty within primary care over
65s
GP Strategic
Lead /
Increased opportunities for
collaborative working between
general practice and
30-Jun-2027
Collaborative work progressing with Dr Gray’s. Home
assessment pathway virtual wards will assist
identification of our most vulnerable cohort. 
5% 
Page 315

Page 316

APPENDIX 1
13
Moray
Frailty Lead  
secondary care teams,
proactively managing frailty in
the community. 
Strategic Delivery Plan 2025-2028
2. Home First
4. We help build communities where people are safe; 4.2 Public Protection 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
Cat4.2.1
Preventing Suicide and Self
Harm 
Deliver the Moray Suicide
Prevention Action Plan 2025-28 
Working in partnership so that
People:
- in distress experience timely,
compassionate and trauma
informed responses.
- who have self-harmed receive
effective treatment and aftercare
- are prevented from future
suicide attempts and/or self-harm
HSCM
Mental
Health
Strategic
Group
Moray
Suicide
Prevention
Group
(SP1) More people in our
communities have a clear
understanding of suicide, risk
factors, and its prevention 
(SP2) People experiencing
suicidal crisis are kept safe
and their situations do not
further escalate 
(SP3) More people are
supported through Distress
Brief Interventions  
31-Mar-2028
SP1 - There has been a wide range of
information/capacity building events for young people,
community groups, and staff groups. Of note are events
in two Moray secondary schools, armed forces bases,
larger local employers, and highland games events. 
SP2 - Additional Moray staff have been trained to
deliver ASIST (Applied Suicide Intervention Skills
Training) courses. One course has been delivered with
two more courses to follow within the current financial
year. 
The Moray Suicide Prevention Group is currently
establishing a local multiagency review model for suicide
deaths, drawing from the existing approach by the
Moray ADP Drug Related Death and Learning process. 
Suicide death reviews are currently completed on a
Grampian basis by SAMH and Police. A learning report
prepared by the Grampian Suicide Prevention Group
provides a snapshot of 38 deaths by suicide in the North
East between Jun-Dec 2024. Cases were reviewed to
determine what contact had taken place with support
services prior to death. The learning from this has been
fed back into discussions within the Moray Suicide
Prevention Group. 
Following the information sessions arranged by Public
Health Scotland, Moray has agreed to implement the
QES system for recording suicides. This will allow the
capture and analysis of data from multiple agency
60% 
Page 316

Page 317

APPENDIX 1
14
sources, contributing towards the development of a
multiagency suicide review model. 
The Moray Suicide Prevention group are currently
finalising a suicide cluster response protocol for Moray.
This will identify the development of any trends and
prompt a proactive prevention response 
SP3 - The recently commissioned SAMH Services are
now operational and fully staffed. The Distress Brief
Intervention Service have provided support for 108
individuals, and the Intensive Recovery and Community
Support Service have provided support for 85
individuals in the 1st Quarter 2025.  
HSCM
STRADPLAN
Cat4.2.2
Reducing drug and alcohol
related harm   
Deliver the Moray Alcohol & Drug
Partnership Strategic Delivery Plan
2025-28 
Working in partnership so that
People:
- who take harmful drugs are
offered evidence-based harm
reduction and advice 
- can access the services they
need to support their recovery.
- remain in treatment for as long
as they need to.
Moray
Integrated
Drug and
Alcohol
Service
(MIDAS) 
Moray
Alcohol &
Drug
Partnership
(ADP1) More people receive
overdose awareness advice
and provision of take-home
naloxone 
(ADP2) People wait no more
than three weeks for specialist
drug and alcohol treatment 
(ADP3) More people have
access to Residential
Rehabilitation placements 
(ADP4) Fewer people
disengage from specialist drug
and alcohol treatment  
31-Mar-2028
ADP1 -Harm reduction outreach has remained
consistent, with daily huddles, assertive follow-up to
non-fatal overdoses, and third sector involvement
ensuring supplies, training and advice remain
accessible.
• In Q1 2025/26, 45 naloxone supplies were
recorded. This is higher than the low figure of 5
supplies distributed in Q4 2024/25 but remains
lower than past averages. (Data for Q2 2024/26 is
not yet available).
• A review of the dip in supplies distributed in Q4
2024/25 has been completed, with the Arrows
service building move identified as a temporary
contributing factor.
Moray’s second recovery community engagement event
took place in Lossiemouth on 30 Aug to incorporate
national overdose awareness day and included a
recovery walk in memory of people who have lost their
lives to substance use. 
ADP2 -Moray’s integrated pathway, with single-point
access, same-day prescribing where appropriate, and
improved service co-location, continues to ensure
accessible and timely support.
• In Q1 2025/26, 97.4% of people started treatment
within three weeks of referral. 
• In Q2 2025/26, this remained high at 96.8%. 
15% 
Page 317

Page 318

APPENDIX 1
15
• Both figures are above the national target of 90%.
ADP3 -- The ADP actively attends and participates in
national networks and thematic groups on residential
rehabilitation, ensuring local practice aligns with
national priorities and learning. These actions are
strengthening consistency of referral processes,
provider engagement, and aftercare arrangements.
• A clear local residential rehabilitation pathway is
now fully established. The pathway has been co-
produced with people with lived and living
experience and promoted widely across Moray. 
• A Residential Rehabilitation Link Worker has now
been onboarded by our third sector provider service
(Arrows) to provide tailored support before, during,
and after placements. 
• Good working relationships with rehab providers
have been maintained, and Moray continues to use
the new Scotland Excel framework to support
placement access.
• Local area allocation of residential rehab funding is
fully used with further placements secured through
the Scottish Government’s additional placement
fund.
• In Q1 and Q2 2025/26, 9 people completed
residential rehabilitation. This is an increase on
annual total of 8 for 2024/25 
ADP4 - Unplanned discharges continue to highlight the
challenges for services to sustain engagement. Real-
time monitoring systems remain in place, with assertive
follow-up, welfare checks, and lived/living experience
outreach supporting people to re-engage after leaving
treatment. Multi-agency partners continue to review
discharge trends, and escalation processes have been
agreed to ensure risks are identified and addressed
promptly.
• In Q1 2025/26, 120 unplanned discharges were
recorded, a small reduction from 126 in Q4
2024/25. 
• Data for Q2 2025/26 is not yet available.
• A joint review recently conducted by MIDAS and
Arrows identified system challenges for discharge
recording, where the discharge data currently
Page 318

Page 319

APPENDIX 1
16
includes examples of service re-allocation within
our integrated system. 
Training on the Drug and Alcohol Information System
(DAISy) has now been implemented for teams to enable
more consistent and accurate recording. It is anticipated
that this will result in more accurate discharge data to
monitor going forward.
HSCM
STRADPLAN
Cat4.2.3
Protecting Children and Young
People   
Deliver the Moray Children’s
Services Plan 2023-26 Priority -
Keeping Children & Young People
Safe 
Working in partnership so that
children and young people:
- are safer because risks have
been identified early and
responded to effectively.
- lives improve with high quality
planning and support
- experience sustained loving and
nurturing relationships to keep
them safe from further harm.
Moray
Children &
Families
Social Work
and
Community
Child Health
Services  
Moray Child
Protection
Committee
(CPC1) More children and
young people are supported to
develop healthy relationships
with peers, online and in the
community 
(CPC2) More children and
young people are protected
from harm because of
improved home circumstances 
(CPC3) Children who have
experienced or witnessed
abuse are supported through
recovery and do not
experience further trauma. 
31-Mar-2026
CPC1 - More children and young people are supported
to develop healthy relationships with peers, online and
in the community 
Advice, information, and training is provided across a
range of professional, community and school
engagement events covering online safety, sexual
extortion and sharing nude images as part of the CPCs
online safety campaign.
•Staff across the partnership have received
‘manosphere’ training from Moray CPC and Moray’s
VAWG partnership on influences of harmful misogynistic
content online
•Parent/carer workshops continue to be offered on
various online safety topics. A new session on the
manosphere has been developed for parents with the
first workshop delivered during the school summer
holidays. 
All secondary schools in Moray have signed up to the
Equally Safe at School programme. This intervention
works with the whole school community to address
gender-based violence, which includes staff training,
policy development, and student-led action groups. 
•Moray Rape Crisis continue to deliver the Sexual
Violence Prevention programme across schools and
youth settings, for young people aged 11 to 25 in
Moray. 
•The Mentors in Violence Prevention programme is also
being implemented in all secondary schools. 
CPC2 - More children and young people are protected
from harm because of improved home circumstances 
Baseline measurements are in the process of being
established to understand the vulnerability factors
recorded when children’s names are placed on the child
protection register, and the definition for improved
60% 
Page 319

Page 320

APPENDIX 1
17
circumstances that are recorded when children’s names
are removed. There is potential that this learning will
inform joint development activity with adult mental
health and substance use services, based on the
prevalence of child protection activity with parent/carer
mental health and substance use recorded as a factor. 
Work to embed the Graded Care Profile 2, a strengths-
based assessment of care, continues with training
delivery for the children’s services workforce. Evaluation
of the tool’s uptake and application in practice is in the
early stages. A review of local multiagency training on
understanding neglect is also underway, to align it with
new national training materials on this subject. 
Activity to support wider practice improvement
continues in line with national guidance with the
following workstreams underway:
•Development of an interagency assessment protocol to
provide practitioners with a defined list of resources and
the accompanying criteria for use
• Introducing a Contextual Safeguarding
approach for young people at risk of harm from outside
the home/in the community.
•Development of a toolkit to assist practitioners in
gathering and understanding the voice of the child 
CPC3 -Children who have experienced or witnessed
abuse are supported through recovery and do not
experience further trauma. 
The Scottish Child Interview Model, a new trauma
informed approach for joint investigative interviews, is
fully embedded in Moray with most interviews now
conducted by the SCIM team. 
2025/26 Bairns’ Hoose Development Funding has been
awarded to Moray to establish a local Bairns’ Hoose
Partnership and conduct a self-evaluation against the
national Bairns’ Hoose Standards. Through process
mapping and engagement activities with children,
families and practitioners, the evaluation will inform
long term plans to develop a joined up holistic model of
therapeutic recovery support for children in Moray who
Page 320

Page 321

APPENDIX 1
18
have experienced or witnessed abuse. The funding
includes additional resource for key services including
1.5FTE Quarriers Children’s Rights Workers (now in
post) and 1FTE Senior Social Worker (recruitment
underway). Additional staff resource has also been
secured through test of change funding to align with
Grampian wide Bairns’ Hoose activity to develop co-
ordinated healthcare support and enhance specialist
speech and language provision. 
The development of a Journey Audit Tool has been
completed and agreed by Moray Adult Protection
Committee and HSCM SW Practice Governance Board.
Audits are being undertaken by ASP lead officer with
view to widen auditors to include multi-agency
practitioners in future. 
HSCM
STRADPLAN
Cat4.2.4
Protecting Adults at risk of harm
Deliver the Moray Adult Support
and Protection Self Evaluation
Improvement Action Plan 2024-
2026
Moray Adult
Social Work
Services 
Moray Adult
Protection
Committee
(ASP1) More Adults are
protected from harm due to a
reduction of risk 
(ASP2) Adults at risk of harm
report feeling safer because of
their adult support and
protection plan 
(ASP3) Adults at risk of harm
experience improvement to
their health, wellbeing 
and overall quality of life  
31-Mar-2026
ASP1- Awareness raising and practice development
activity continues across the partnership, aligned with
Grampian Adult Support & Protection improvement
activity. 
•A Grampian wide webinar took place in September
supporting trauma informed approaches for adults who
are ‘out of sight’ and hard to reach.
•A multi-agency short life working group on self-neglect
and hoarding has been established for Moray, to raise
awareness of the subject area and to develop clear
practitioner guidance, training, and practice tools.
In partnership with the Care Inspectorate, Moray ASP
have completed a self-evaluation exercise against
Quality Indicator 5.7 from the Quality Improvement
Framework: ‘’Effective support and early intervention
for adults with escalating risks for whom a
straightforward application of the three-point criteria is
difficult to apply’’. 
•As part of this workstream the Partnership showcased
Moray’s Interagency Vulnerable Adults process (MIVA).
MIVA is a proactive and collaborative workstream where
adults who are of concern in the community and are
experiencing perceived escalating risks can be discussed
within a multi-agency forum.
•The evaluation identified several strengths in local
systems and practice, highlighting the good work
undertaken by the MIVA workstream.
60% 
Page 321

Page 322

APPENDIX 1
19
•Areas for improvement have also been highlighted;
these actions will be incorporated into the existing ASP
improvement plan for the partnership. 
•In addition to the Adult Protection Committee, the self-
evaluation findings will be presented to Moray Public
Protection Chief Officers Group, NHS Grampian Public
Protection Committee and HSCM SW Practice
Governance Board. 
ASP2- Improvement activity relating to Adult Support
and Protection Planning continues across the
partnership:
•Grampian ASP Case Conference Standards have now
been completed following consultation, and approval
from Moray Adult Protection Committee. To support
dissemination and embedding of the Standards an
information/awareness session will take place within
Forums across the Partnership.
•A full review of Moray ASP Operational Guidance for
local authority (lead agency) is underway, including
consultation with front line practitioners
•Work is underway with advocacy services to develop a
“Statement of views” document to enhance participation
in adult protection processes 
ASP3 -The development of a Journey Audit Tool has
been completed and agreed by Moray Adult Protection
Committee and HSCM SW Practice Governance Board.
Audits are being undertaken by ASP lead officer with
view to widen auditors to include multi-agency
practitioners in future. 
HSCM
STRADPLAN
Cat4.2.5
Reduce reoffending   
Deliver the Moray Community
Justice Outcome Improvement
Plan 2024-27 
Working in partnership so that:
- People can access the services
they need to support desistance 
- People have access to suitable
support following release from a
prison sentence
Moray
Justice
Social Work
Service  
Moray
Community
Justice
Partnership
(CJP1) More people
successfully complete their
community payback or drug
testing and treatment orders 
(CJP2) More people are
supported by throughcare
services upon release from
prison 
(CJP3) More people are
referred onto support services
by custody centres  
31-Mar-2027
CJP1 More people successfully complete their
community payback or drug testing and treatment
orders 
The partnership is delivering a broad range of services
and programmes to support desistance, address
individual needs, and promote successful completion of
community sentences. 
• Groupwork delivery for Moving Forward to Change
(MF2C) programme has been introduced, using a
2:1 model where required.
25% 
Page 322

Page 323

APPENDIX 1
20
- People in police custody receive
support to address their needs
• Preparation activity for the Caledonian System
included staff training, completion of strategic case
profiling, and awareness raising with partners and
community members.
• Work is underway with the Learning Disabilities
Social Work Team to understand and address the
specific needs of individuals with learning
disabilities within the justice cohort.
A review of Unpaid Work has been completed, resulting
in a new leaflet and improved guidance. Processes have
been updated through an Operations Manual, staff
training delivered, and monthly practice sessions
established. Community inputs and stalls have taken
place to raise awareness. 
Following initial evaluation, a pilot project between
justice social work and Crossreach Counselling has been
extended. With the aim of providing additional supports
to enable adherence to Community Payback Orders
(CPOs), priority is given to women and care-
experienced young people supported by Justice Social
Work. Evaluation of the project will also continue. 
CJP2- Feedback was received through HMP Inverness
that joint in-reach visits from Arrows (alcohol and drug
service), and MIDAS (Moray Integrated Drug and
Alcohol Service) were desired, this is now in place. 
Moray has strengthened collaborative approaches to
ensure continuity of health and social care for
individuals released from custody. Activity has included
participation in structures such as the HMP Inverness
Liberation Planning meetings, Grampian Case
Management Board, local prison liberation subgroups,
and the Health & Prisons Group with HMP Highland,
ensuring that health and social care needs, including
mental health and guardianships, are considered in
planning for the new establishment. 
A Moray services event was recently held in HMP
Inverness, those with a Moray postcode were invited to
learn about services who can support them on
liberation. Moray Pathways provided a presentation on
their employability work, including the Swap project.
Page 323

Page 324

APPENDIX 1
21
NHS Grampian Health Improvement provided a
presentation on their work and how to access via drop
ins and the Health Point. They were joined following this
by the NHS Grampian Oral Health team, DWP and
Moray Wellbeing Hub in providing stalls in the
afternoon. The Community Justice Partnership stall also
collected on the day feedback from those who attended,
which will be combined with feedback from stallholders
to inform future in-reach activity and events 
An event for community members and partners was
hosted to publicise the new Upside Voluntary
Throughcare Service available for those leaving prison
on a short-term sentence (4 years or less) without
license conditions. This will sit alongside, and
compliment, the Justice Services Voluntary Throughcare
work. Press release - Moray welcomes national service
to support people leaving prison - Moray Protects 
CJP3 - Moray does not currently have a local police
custody project. Instead, we are monitoring and
learning from the work being undertaken in Aberdeen
City, alongside Aberdeenshire. This approach was
agreed with Police Scotland colleagues, as all three
areas share the Grampian policing area, allowing any
successful initiatives to be implemented consistently
across the region.
• The partnership is collaborating with Police Scotland
to explore the development of a Police Scotland
local arrest referral offer. This work is at an early
stage.
• A collaborative approach and strong links with the
custody nurses in Elgin Custody Suite has improved
information-sharing and referral opportunities into
wider support services, particularly around
substance use and mental health.
A key area of development within Youth Justice is to
create a strategic approach for those under 18, with
alignment to forthcoming changes under the Care and
Justice Act. This work is supported through the creation
of a weekly plan, which helps to provide consistency and
structure in how young people’s needs are identified and
addressed.
Page 324

Page 325

APPENDIX 1
22
HSCM
STRADPLAN
Cat4.2.6
Eradicating Violence against
Women & Girls (VAWG)   
Deliver the Moray Violence against
Women and Girls Partnership
Delivery Plan 2025-28 
Working in partnership so that:
- People in Moray are equally safe
and respected
- Survivors of VAWG have access
to trauma-informed recovery,
support, and justice.
- Children affected by domestic
abuse are supported to stay safe
and remain in the care of their
non-offending parent
- Perpetrators are held to account
and supported to change their
behaviour
Moray
Children &
Families and
Justice
Social Work 
Community
Child Health
Services  
Moray
Violence
against
Women &
Girls
Partnership
(VAWG 1) More people in our
communities understand the
causes and consequences of
VAWG 
(VAWG 2) Women and
children report feeling safer as
a result of the specialist
support they have received. 
(VAWG 3) Fewer children and
young people are placed in
care due to domestic abuse 
(VAWG 4) More people
successfully complete
specialist perpetrator
interventions  
31-Mar-2028
VAWG 1 -Through Delivering Equally Safe Funding, the
Moray VAWG Partnership continues to deliver a wide
range of awareness raising and workforce development
activity. 
• In September, Moray hosted ‘Closing the Gap’
conference exploring the current legal, political,
social & technological barriers to ending violence
against women & girls. Over 100 attendees heard
inputs from key speaker and survivors voice to
better understand how the Scottish legal system
could better support the survivors of VAWG, how
gender equality is under attack worldwide, and how
technology is reinvigorating misogyny 
• For this year’s 16 Days of Activism against Gender-
Based Violence, Moray VAWG Partnership will host
our second Reclaim the Night March on 25 Nov, and
welcome Susie Heywood, public health specialist
and suicide-prevention expert, on 28 Nov to talk
about her work on challenging harmful gender
stereotypes in the early-years.
VAWG 2 - Moray faces significant gaps in Violence
Against Women and Girls (VAWG) provision, most
notably the absence of Independent Domestic Abuse
Advocacy (IDAA) for victims at highest risk of harm.
Partnership coordination is also under-resourced, and
demand for specialist VAWG services continues to grow
with waiting lists in operation. 
• At the request of Moray Chief Officers Group for
Public Protection, Moray VAWG Partnership
produced a Position Statement on Violence Against
Women and Girls Funding, setting out the funding
pressures facing local specialist services and
providing national context for these challenges to
inform future planning. 
• A coordinated partnership approach to strategic
planning and commissioning will be essential to
address chronic underfunding, strengthen local
leadership, and ensure victims receive the support
they need.
A new Moray Multi-Agency Risk Assessment Conference
(MARAC) steering group has been established, to review
10% 
Page 325

Page 326

APPENDIX 1
23
and improve the multiagency assessment and support
for victims where high-risk Domestic Abuse is identified. 
• Two senior staff in social work are now trained to
chair MARACs building local capacity and
supporting the existing Police chair provision for
the Northeast. 
• Seven places have been funded for partnership
staff to complete MARAC rep training. 
• Delivery of wider workforce development is
underway with new introductory sessions for
frontline staff on the Domestic Abuse, Stalking
and Honour Based Violence Risk Identification
Checklist (DASH-RIC), Multi-Agency Risk
Assessment Conference (MARAC), and Disclosure
Scheme for Domestic Abuse Scotland (DSDAS).
VAWG 3- Local implementation of the Safe & Together
practice model is well underway in Moray, with a
programme of accredited workforce training delivered
across multiagency frontline practitioners and
supervisors. Evaluation of impact, including file audit, is
to be completed and will inform next steps. 
Baseline measurements are to be confirmed to
understand the proportion of children placed on the
child protection register due to concerns relating to
domestic abuse, and those living in care both at home
and away from home due to domestic abuse. The
implementation of Safe & Together involves practice,
system and culture change that may not be reflected in
this data over a short term. 
VAWG 4 - The Justice Social Work Service are now able
to offer the Caledonian System, an integrated approach
to addressing domestic abuse in Scotland. This
programme combines a court-ordered behaviour change
initiative for men with support services for women and
children. A new staff member has recently been
appointed to the support work post which assists with
women's work in the programme. 
Page 326

Page 327

APPENDIX 1
24
Strategic Delivery Plan 2025-2028
3. Partners in Care
5. We are an ambitious and effective partnership; 5.1 Redesigning models of care 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
STRADPLAN
25-28
Cat5.1.1
Community Hospital Redesign Head of
Service  
Develop rehab and
reablement capacity to
improve flow through the
system and maximise the
services community hospitals
provide. 
Minimise time people spend in
hospital and do more
reablement in people’s homes.
31-Dec-2027
After a temporary delay due to a change in personnel,
the redesign discussions have commenced once more.
An options appraisal is being completed, bearing in
mind Discharge without Delay and home assessment
programmes are underway. Once the Home assessment
pathway is properly commenced by December 2025, the
evaluation of the pathway success will shape the future
model, in collaboration with Discharge Lounge and front
door activity at Dr Gray’s  
5% 
STRADPLAN
25-28
Cat5.1.2
GMED - redesign
Service
Manager -
GMED  
Developing a sustainable
workforce to provide a
responsive service to the
public to ensure people are
seen by the right people at
the right time in the right
location. 
Delivery of high quality,
person-centred sustainable
urgent and unscheduled
primary care services to the
Grampian population by
ensuring that the service has
safe workforce levels  
31-Dec-2026
The rollout of the engagement plan has been delayed
due to limited operational capacity across the service
during the spring and summer months, compounded by
the complexity of the review process. As a result, the
deadline for presenting the service model to the
Integration Joint Boards (IJBs) will be rescheduled to
early 2026. To support progress, additional capacity has
now been identified within HSCM.  20% 
Page 327

Page 328

APPENDIX 1
25
Strategic Delivery Plan 2025-2028
3. Partners in Care
5. We are an ambitious and effective partnership; 5.2 Strategic Review and redesign of care at home service. 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
STRADPLAN
25-28
Cat5.2.1
Strategic Review and redesign of
care at home service
Service
Manager -
Provider
Services  
Provide person centred
outcomes-based care service
with greater choice and
control by September 2028. 
Strengthen the community
and individual asset led
approach to increase options
for support and early
intervention by September
2028. 
Creation of the ability to
provide efficient, safe, and
effective service. 
Provide a quality service
across all providers that
achieves a Care Inspectorate
rating of 4 and above. 
30-Nov-2025
Redesign culminated in report going to the IJB. 
Initial milestone - New Framework put in place using
SXL for all Option 3 provision and Community Asset
Framework can be used for Option 2 where required. 
This is action is progressing well with some new
provider onboarding which enables better choice for
people requiring services. There is some development
work required to enable the appropriate sharing of
information and data sharing protocols are being
worked through at present. 
In addition, levels of unmet need for care is showing
signs of reduction. 
The steering group will be defining further milestones
for reporting progress and collation of evidence to
support achievement of outcomes for people. 
80% 
Strategic Delivery Plan 2025-2028
3. Partners in Care
5. We are an ambitious and effective partnership; 5.3 Adults Day Services 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
Cat5.3.1
Review and Redesign of Adults
Day Care services
Service
Manager -
Provider
Services 
A full redesign and
modernisation of Adult day
services where individuals are
able to access sustainable day
support, which is person
centred and meets their
31-Mar-2026
This project has not progressed as intended, in part due
to lack of project management. The project officer
appointed retired in April and their replacement does
not start until December 2025. 
Work has progressed in service on identification of
needs and current provision, both internally provided
20% 
Page 328

Page 329

APPENDIX 1
26
agreed outcomes and
aspiration. 
Where appropriate day service
will be provided within their
own local communities, and
where this is not possible the
review of the transportation
policy will provide clarity of
what support will be available. 
and externally provided. The establishment of an SDS
framework under Scotland Excel and some initial block
contracts for some providers is reducing our off contract
spend and providing additional assurance that available
places are being effectively used. 
Work on the review of transport policy has progressed
and a draft produced but further work is required to
establish the potential implications for people and for
budgets for the options identified before a decision can
be made. A decision on transport will impact on the day
services costs so the two elements need to proceed
alongside each other. The project timescale will need to
extend to December 2026 to enable appropriate
engagement with stakeholders. 
Strategic Delivery Plan 2025-2028
3. Partners in Care
5. We are an ambitious and effective partnership; 5.4 Suitable Housing - Strategic Oversight of accommodation requirements 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
STRADPLAN
25-28
Cat5.4.1
Learning Disability long term
sustainable accommodation
Service
Manager -
LD /
Locality
Manager
Elgin 
Reduction in the out of area
placements and associated
costs 
Increase in the number of
people with learning
disabilities establishing
tenancies  
31-Mar-2026
Some individuals have recently returned from Out of
Area placements. Due to significant delays in the
progression of the Woodview 2 project, these individuals
have transitioned into standalone tenancies, supported
by outreach services provided through the Woodview
team. While this transition has successfully reduced the
total number of Out of Area placements, there has not
yet been a corresponding reduction in costs. This is due
to the standalone support packages currently in place
being similar in cost to the original placements.
However, it is anticipated that costs will decrease over
time as the individuals settle into their new routines and
associated challenging behaviours diminish. 
Phase 1 of the Western Village project has successfully
enabled some adults with Learning Disabilities to secure
supported tenancies. Phase 2 is progressing well and
will provide supported tenancies for a further thirteen
adults with Learning Disabilities. This includes some
40% 
Page 329

Page 330

APPENDIX 1
27
individuals currently placed out of area. The project has
an expected completion date of April 2026. The
Learning Disabilities Integrated Service Manager
continues to maintain strong collaborative links with
housing services to ensure the needs of adults with
Learning Disabilities are fully considered in strategic
planning. The Community Learning Disability Team
continues to maintain an up-to-date register of
anticipated accommodation needs. This includes young
people transitioning into adult services who are
projected to require care and accommodation. This
supports effective planning and enables the strategic
use of housing and care options that provide cost
efficiencies and economies of scale. 
STRADPLAN
25-28
Cat5.4.2
Older People - provision of
sustainable supported
accommodation
Local
Housing
Strategy
Steering
Group  
Requirement defined for
incorporating into the Local
Housing Strategy  
31-Aug-2025
Older people requirements have been defined and
incorporated in the Local Housing Strategy
100% 
STRADPLAN
25-28
Cat5.4.3
Mental health - provision of
sustainable, appropriate
supported accommodation
Local
Housing
Strategy
Steering
Group 
Plan for provision of supported
accommodation   30-Sep-2026
Commissioning are progressing a piece of work in
relation to Mental Health needs analysis which will be
presented to the next strategic mental health group on
5 November
10% 
Strategic Delivery Plan 2025-2028
3. Partners in Care
5. We are an ambitious and effective partnership; 5.5 GIRFE 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
STRADPLAN
25-18
Cat5.5.1
Embed the GIRFE toolkit and
principles into the planning and
delivery of services.
GIRFE Lead
Officer 
GIRFE principles embedded in
service delivery   31-Mar-2026
Presentation on the toolkit for operational management
team completed and signposting to further information
and supports. Training to wider teams ongoing. 
Social Prescribing, Realistic Medicine, and Community
Appointment days are being developed/scaled up across
Moray on a Locality basis facilitated by the Health
Improvement Team. The principles of Getting it Right
for Everyone (GIRFE) are being embedded in this work.
60% 
Page 330

Page 331

APPENDIX 1
28 
Strategic Delivery Plan 2025-2028
3. Partners in Care
5. We are an ambitious and effective partnership; 5.6 Support for long term conditions 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
STRADPLAN
25-28
Cat5.6.1
Heart of Moray - Making it easier
to improve our health and
wellbeing. - Diabetes
Lead
Dietician  
Improvement in health of
participants in the
programme. 
Increased number of
participants accessing the
services  
30-Sep-2026
DHI Lab 2 - Long-Term Conditions Co-Management
(NHS) are focusing on those living with type 2 diabetes
and high BMI. Heart of Moray launched in February
2025 in partnership with Moray Leisure as a supportive
self-management programme focused on physical
activity and healthy weight. It is open to those living
with or at risk of one or more controlled long-term
conditions and who require support to engage in
physical activity. Data is being collated to assess the
effectiveness of the initiative which will inform the next
steps.
50% 
STRADPLAN
25-28
Cat5.6.2
Consolidation of palliative cancer
services Chief Nurse  
Sustainable model of care in
place Support available to
those who need it. 
31-Mar-2026
Details of existing provision being collated to provide
evidence for potential options for the service model
review. The new lead operational nurse will be taking
this forward
10% 
STRADPLAN
25-28
Cat5.6.3
Establishment of a Moray
Dementia Strategy and Moray
Dementia Pathway in line with
Grampian and National dementia
delivery plans.
Mental
Health
Services
Manager  
Moray Dementia pathway in
place.  31-Mar-2026
Engagement with this is being discussed at a Grampian
level. There is a requirement to set up a Moray Group as
a subgroup of the Grampian Dementia Strategy group. 10% 
STRADPLAN
25-28
Cat5.6.4
Embed promotion of technology
enabled care (TEC) options within
assessment process to increase
use and impact of TEC, supporting
self-management (i.e. to support
management of longer-term
conditions)
Digital Lead 
Increase in use of TEC to
support people to live
independently. 
31-Mar-2026
On target to complete transfer of Analogue to Digital
community alarms by end of October. 
HSCM have been awarded Gold level One Digital
Telecare Implementation Award from Digital Telecare
for Scottish Local Government. The Smart Housing
Smart Communities initiative is underway in Buckie, in
partnership with Digital Health Institute and Archangel
to evaluate AI-powered ambient monitoring and
predictive care technologies to enhance telecare
delivery. This project will inform the direction of TEC
provision in Moray. 
20% 
Page 331

Page 332

APPENDIX 1
29
Strategic Delivery Plan 2025-2028
3. Partners in Care
5. We are an ambitious and effective partnership; 5.7 Moray Growth Deal 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
STRADPLAN
25-28
Cat5.7.1
Partnership working to support the
research and development
initiatives led by DHI (Research
and development of the 5 Living
Lab research and design projects)
DHI /
Digital
Health Lead
Reduced dependency on
HSCM Services through: 
* Increased access to
community services 
* Development of a
community occupational
health pathway 
* Development of a Personal
Data Store and the
Community Connections
Moray digital platform 
* Increased access to SMART
housing and remote
monitoring within the
community  
31-Mar-2026
All elements of the workstreams have progressed. 
Living Lab 1 - Supported Self-Management and Living
Lab 2 - Long-Term Conditions Co-Management (NHS)
are focusing on those living with type 2 diabetes and
high BMI. Heart of Moray launched in February 2025 in
partnership with Moray Leisure as a supportive self-
management programme focused on physical activity
and healthy weight. It is open to those living with or at
risk of one or more controlled long-term conditions and
who require support to engage in physical activity. Data
is being collated to assess the effectiveness of the
initiative which will inform the next steps. 
Living Lab 3 – Care in Place – development of the
Personal Data store has progressed with a lot of
background digital architecture and data sharing
protocols being established. There is work underway
being led by the Digital office and the work in Moray is
being fed into this National project. 
Moray Community Connections is an online tool to
assist people and those who support them the ability to
find local services and supports available in the
community, as well mechanisms for referrals to
appropriate HSCM services, such as District Nurses and
Occupational Therapy. A business case to ensure this
tool remains updated and is sustainable is being
prepared. 
Living Lab 4 – Smart Housing/Communities, the RCE
team, in partnership with Health and Social Care Moray,
is exploring innovative uses of digital systems, creating
an opportunity to enhance safety and independence at
home through smart technology. Updated in 18.4 
Living Lab 5 - Mental Well-Being, is developing and
testing innovative solutions to tackle poor mental health
and low well-being. 
80% 
Page 332

Page 333

APPENDIX 1
30 
Strategic Delivery Plan 2025-2028
4. Strategic Leadership, Planning and Performance
E1 Digital Health and Care 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
CatE1.1
Develop Strategy for Technology
Enabled Care - Implementation of
the Analogue to Digital plan for
community alarms
Project
Board A2D /
DHI / Team
manager
(OT) 
First phase of transfer
completed by December 2025   31-Dec-2025
Plan on target and due to complete before end of
October 2025 which is the revised date for the switch
over.  95% 
HSCM
STRADPLAN
CatE1.2
Develop Strategy for Technology
Enabled Care - Developing and
implementing a strategic approach
and framework for TEC support,
based on evidence, to provide
sustainable options through
collaboration with DHI
Project
Board A2D /
DHI / Team
manager
(OT) 
Model of support is in place
and shared widely   31-Mar-2026
Learning from the Rural Centre of Excellence (RCE)
Digital health and care innovation and living lab 4 will
inform the development of the strategic approach for
Moray. 
A test of change is underway along with benchmarking
with other partnerships to consider and evaluate
options. On target to produce a strategic framework by
end of March. 
30% 
HSCM
STRADPLAN
CatE1.3
New Social Work and Social Care
Information Management System
Head of
Service/
CSWO 
Implement a new system that
will be the single source of
truth about people receiving
services, which is fit for future
development and will underpin
efficient and effective working. 
31-Mar-2027
Evaluation of options and procurement process is
progressing, and it is hoped a preferred supplier will be
identified by the end of October. Both the Council and
MIJB recognise the requirement for a new system and
discussions regarding funding options are ongoing but
will be resolved to enable a contract to be progressed.
All potential suppliers have advised that implementation
will be able to be completed by 31/3/27, if sufficiently
skilled staff resource is identified for key roles. The
project Board has recognised this and provided
assurance that this project will be a key priority for
HSCM. 
15% 
HSCM
STRADPLAN
CatE1.4
Incorporating new technologies Digital Lead 
Increased capacity for other
essential tasks through the
implementation of artificial
intelligence in various
functions. 
31-Dec-2026
Trials of “co-pilot” are underway with a view to
identifying more efficient and effective ways of working
to release capacity. One aspect is the ability to take
notes and record actions from low level meetings which
releases admin time. A programme of trials will be
developed to take this forward so learning can be
shared and decisions made regarding adoption across
services. 
10% 
Page 333

Page 334

APPENDIX 1
31
Strategic Delivery Plan 2025-2028
4. Strategic Leadership, Planning and Performance
E2 Strategic Commissioning 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
CatE2.1
In collaboration with stakeholders,
develop a Strategic
Commissioning Strategy and
Market position statement that
underpins the MIJB Strategic Plan
SMT /
Strategic
Planning
and
Commissioni
ng Group 
Strategic Framework and
governance approved and
implemented  
31-Dec-2025
In progress. 
First milestone is establishment of governance
framework. Proposed structure for governance oversight
of SDP discussed at SMT and draft TOR and attendees
being collated. Progress updated on SDP actions collated
and being reported to Audit performance and risk
committee in October 2025. 
Work on the commissioning strategy has commenced
but timescale is into next year for completion. 
75% 
Strategic Delivery Plan 2025-2028
4. Strategic Leadership, Planning and Performance
E3 Communications 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
CatE3.1
Develop and embed a strategy to
inform and engage with all
stakeholders and to include
management of expectations
Corporate
Manager /
SMT  
Communications Strategy
approved and implemented.  30-Sep-2025
In development, but the report is not yet complete due
to current workload pressures. Work is ongoing to
ensure the document reflects statutory principles,
including ‘Planning with People,’ and aligns with relevant
HSCP communications and engagement guidance.
Revised date for draft document completion is end of
December 2025
30% 
Page 334

Page 335

APPENDIX 1
32
Strategic Delivery Plan 2025-2028
4. Strategic Leadership, Planning and Performance
E4 Workforce 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
CatE4.1
Ensuring we have a Workforce
that is agile and motivated to
meet the challenges presented
and that is sustainable and safe
with a focus on staff wellbeing.
SMT 
Annual Report (via NHSG) 
Workforce plan implemented 
Improved retention rates 
Succession Planning
embedded  
31-Dec-2025
Annexe A for NHSG workforce annual plan was
completed. 
The workforce plan is underway and will be completed
by March 2026, but we needed to understand the KPMG
priorities and had been waiting for SG response to
annexe a which we now have. We will need to 'rightsize'
the workforce - right person in the right post. 
Our delivery plan remains in place until it is superseded
by the new workforce plan which will be accompanied
by a delivery plan. 
30% 
HSCM
STRADPLAN
CatE4.2
Our volunteers provide a vital and
valuable contribution to the levels
of support that can be provided to
our communities. This is an area
we need to grow in order to meet
needs appropriately.
SMT 
Increased number of people
living well in their own homes. 
Reduction in those feeling
socially isolated 
Increase in number of
volunteers and volunteer roles
to support work being done in
clinical settings  
31-Dec-2025
Social volunteers supporting 58 people in their own
home. 
Volunteer responders supporting 36 people in the
community. 
Waiting list for social volunteers and community
responders is currently 94 and 88, respectively. 
77 NHS volunteers providing around 500 hours per
month. 
10% 
Strategic Delivery Plan 2025-2028
4. Strategic Leadership, Planning and Performance
E5 Infrastructure 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
CatE5.1
Working with partners, review of
occupancy and use of premises to
seek opportunities for
rationalisation or collaboration
Moray
Infrastructu
re Group 
Accommodation assessed as
suitable for service delivery   30-Apr-2027
Work on going daily/weekly/monthly discussions with
partners  20% 
Page 335

Page 336

APPENDIX 1
33
with partners, to secure
sustainable and efficient use of
buildings and premises establish
the Infrastructure plan for HSCM
Moray.
Development of opportunities is occurring via
discussions with partners in particular to
review/rationalise premises. 
This will continue to develop over the next 5-10years  
HSCM
STRADPLAN
CatE5.2
Establish the Infrastructure plan
for HSCM Moray.
Moray
Infrastructu
re Group  
Infrastructure plan developed
and adopted   31-Dec-2027
First draft has been completed and being discussed at
HSCM SMT in October 2025.  50% 
Strategic Delivery Plan 2025-2028
4. Strategic Leadership, Planning and Performance
E6 Performance and Quality Assurance & Improvement Frameworks 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
CatE6.1
Develop Performance framework
to further support informed
decision making
Deputy
Head of
Service /
Corporate
Programme
Manager  
Performance framework
updated and implemented   31-Dec-2026
Draft performance framework completed and circulated
for consultation. 
Revised local indicators to APR committee in October for
consideration 
Working progressing on aligning indicators to the
appropriate governance group and assigning to
individuals as the source of truth. 
30% 
HSCM
STRADPLAN
CatE6.2
Embed Quality Assurance
Framework
Deputy
Head of
Service /
Corporate
Programme
Manager  
Quality Assurance Framework
embedded   31-Dec-2026
The new Social Work Assessment audit process and tool
have been developed and implemented in June. The
finding of the first audit will be presented at Practice
Governance meeting at the end of October. 20% 
Strategic Delivery Plan 2025-2028
4. Strategic Leadership, Planning and Performance
E7 Governance 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
CatE7.1
With partners develop good
governance protocols based on
up-to-date policies that support
SMT  Policy and protocol are
updated and implemented   31-Mar-2026
Revised governance framework for SDP monitoring and
development has been considered by SMT, and draft
TOR are being compiled.
40% 
Page 336

Page 337

APPENDIX 1
34
delivery of efficient, effective, and
quality services.
Policy register has been reviewed by HofS and
prioritised. Work is progressing on the transport policy
review.
HSCM
STRADPLAN
CatE7.2
Implementation of learning from
audits and inspections SMT  Positive inspection and audit
reports received   31-Mar-2027
Mechanism for corporate monitoring of progress on
delivery of learning and actions from audits and
inspections has been implemented, and SMT will receive
quarterly assurance updates to ensure actions are
addressed in a timely manner and any delays are
escalated.
10% 
Strategic Delivery Plan 2025-2028
4. Strategic Leadership, Planning and Performance
E8 Finance 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
CatE8.1
Develop and monitor the Financial
Recovery Plan that will enable the
delivery of the Strategic Plan
objectives whilst maintaining
Financial Sustainability.
Chief
Finance
Officer 
Budget savings plan approved
and delivered 
Medium term financial plan
approved by MIJB  
31-Mar-2026
Budget Savings oversight group continues to monitor
progress with savings projects and taking action, as
necessary. Increased focus on grip and control
monitoring is being implemented with SMT leading deep
dives into budget alongside peer reviews. Sustainability
and Transformation workshop to take place on 27
October to inform alignment of strategic and financial
requirements for future years. MIJB development
workshop scheduled for December.
40% 
Strategic Delivery Plan 2025-2028
5. Overall plan progress
2025-28 
Action Code Action Title Lead Desired Outcome Due Date Latest Status Update Progress Status
Icon
HSCM
STRADPLAN
25-28
HSCM Strategic Delivery Plan
2025-2028 SMT   31-Mar-2028
Health and Social Care Moray Strategic Delivery
Plan 2025-2028  14% 
Page 337

Page 338

Page 338