Audit, Performance and Risk Committee
Thursday, 19 June 2025
Council Chambers
NOTICE IS HEREBY GIVEN that a Meeting of the Audit, Performance and Risk
Committee, Council Chambers, Council Office, High Street, Elgin, IV30 1BX on
Thursday, 19 June 2025 at 09:30 to consider the business noted below.
AGENDA
1. Welcome and Apologies
2. Declaration of Member's Interests
3. Minute of meeting of 27 March 2025 5 - 8
4. Action Log of 27 March 2025 9 - 10
5. Quarter 4 (January - March 2025) Performance Report -
Adult Services
11 - 42
6. Quarter 4 (January to March 2025) Performance Report
for Children and Families and Justice Social Work
43 - 78
7. Internal Audit Section - Update Report 79 - 110
8. Internal Audit Annual Report - 2024-25 111 - 120
9. Unaudited Annual Accounts 121 - 198
10. Annual Performance Report 2024-25 199 - 284
11. Development Sessions in November 2024 for Children
Families and Justice Social Work
285 - 308
Page 1

Page 2

Item(s) which the Committee may wish to consider
with the Press and Public excluded
12. CONFIDENTIAL Internal Audit Section Update Report -
NHS Grampian Internal Audit Review
• 1. Information relating to staffing matters;
13. CONFIDENTIAL Update on Improvement Plan for Adult
Social Care Commissioning
• 1. Information relating to staffing matters;
Watching the Meeting
You can watch the webcast live by going to: 
http://www.moray.gov.uk/moray_standard/page_43661.html
Webcasts are available to view for 1 year following the meeting.
You can also attend the meeting in person.  If you wish to
attend in person, please come to the High Street entrance door
and a member of staff will let you into the Chamber.
Page 2

Page 3

MORAY INTEGRATION JOINT BOARD
SEDERUNT
Mr Sandy Riddell  (Chair)
Councillor Scott Lawrence  (Voting Member)
Mr Derick Murray  (Voting Member)
Councillor Ben Williams  (Voting Member)
Mr Sean Coady  (Member)
Ms Sonya Duncan  (Member)
Ms Deborah O'Shea  (Member)
Ms Judith Proctor  (Member)
Ms Deirdre McIntyre  (Non-Voting Member)
Clerk Name: Caroline O'Connor
Clerk Telephone: 07779 999296
Clerk Email: committee.services@moray.gov.uk
Page 3

Page 4

Page 4

Page 5

MINUTE OF MEETING OF THE AUDIT, PERFORMANCE AND RISK COMMITTEE
Thursday, 27 March 2025
Council Chambers, Council Office, High Street, Elgin, IV30 1BX
PRESENT
Mr Sean Coady, Ms Sonya Duncan, Councillor Scott Lawrence, Mr Derick Murray, Ms
Deborah O'Shea, Ms Judith Proctor, Mr Sandy Riddell, Councillor Ben Williams
APOLOGIES
Ms Deirdre McIntyre
IN ATTENDANCE
Interim Chief Social Work Officer/Head of Service; Chief Internal Auditor; Self-
Directed Support and Unpaid Carers Team Manager; Angela Pieri, Engagement
Lead, and Andrew Wallace, Senior Audit Manager, both Grant Thornton; Service
Manager - Provider Services and Caroline O'Connor, Committee Services Officer.
1.         Chair
The meeting was chaired by Mr Sandy Riddell.
2.         Declaration of Member's Interests
The Committee noted there were no declarations of member's interests.
3.         Minute of meeting of 30 January 2025
The minute of the meeting of 30 January 2025 was submitted and approved.
4.         Action Log of Meeting of 30 January 2025
The Action Log of the meeting of 30 January 2025 was discussed and updated
accordingly.
5.         Quarter 3 (October - December 2024) Performance Report - Adult
Services
Item 3.
Page 5

Page 6

The meeting had before it a report by the Corporate Programme Manager updating
the Committee on adult services performance as at Quarter 3 2025 (October -
December 2024).
In response to Councillor Lawrence's concerns relating to the regression in mental
health indicators, the Chair confirmed the Moray Integration Joint Board had been
advised at their meeting that morning that a report is to be presented to the meeting
of the Board in May providing clarity on planned developments and how they will be
implemented.  The Chief Officer further advised that the deterioration in that particular
indicator related to the commencement of treatment under psychological therapies
within 18 weeks of referral which is a challenge across Grampian and largely related
to availability of workforce.   
Councillor Lawrence asked, with reference to paragraph 5.12, whether there was
evidence of the effectiveness of the initiatives to address staff absence.  In response,
the Chair agreed it would be useful to include reference in future reports specifically
relating to take-up and their impacts.
Following consideration the Committee unanimously agreed to:-
(i) note the performance of local indicators for Quarter 3 (October to December
2024) as presented in the Performance Report at Appendix 1;
(ii) note the analysis of the highlighted local indicators and actions being
undertaken to address performance that is outside of acceptable target ranges
as detailed in Appendix 1; and
(iii) note the initiatives ad progress in reducing unmet need as outlined in paras 5.3,
5.4 and in Appendix 2.
6.         Quarter 3 Performance Report for Children and Families and Justice
Social Work
The meeting had before it a report by the Interim Chief Social Work Officer informing
the Committee on Children and Families and Justice Social Work performance as at
Quarter 3 (October to December 2024).
The Chair noted the figure of 13.6% of individuals supported by Justice Social Work
were females in Appendix 1 along with previous research relating to re-offending
which demonstrated access to health services was a block to them being successfully
rehabilitated. He suggested it may be useful to check with Justice Service Social
Work whether there are such issues to ensure individuals are supported and solve
the cycle of reoffending.  In response, the Interim Chief Social Work Officer agreed
future reports would quantify the data if possible or include reference to the research.
During the course of discussion Councillor Lawrence, noting The Promise was
initiated five years ago when Children's Services was under the remit of the Council
and now sits under the auspices of the Moray Integration Joint Board, asked if there
was something the Board could do to demonstrate its continued commitment to The
Promise.  In response the Chief Officer agreed to discuss the most suitable approach
with the Chair and Depute Chair of the Board.
Following consideration the Committee unanimously agreed to:-
Page 6

Page 7

(i) note the performance of local indicators for Quarter 3 as presented in the
Performance Report at Appendix 1; and
(ii) note the analysis of the local indicators as detailed in Appendix 1.
7.         Update on the Delivery of the Unpaid Carers Strategy
The meeting had before it a report by the Service Manager Provider Services
informing Committee of the progress made towards achieving the objectives outlined
in the Unpaid Carers Strategy.
Following consideration the Committee unanimously agreed to:-
(i) acknowledge the progress made in meeting the objectives of the Strategy;
(ii) recognise the challenges faced regarding capacity in delivering key objectives
to date outlined in paragraph 4.3; and
(iii) instruct the Lead Officer for Unpaid Carers to provide quarterly updates to this
Committee to monitor ongoing progress in implementing the Strategy.
8.         Internal Audit Section - Update Report
The meeting had before it a report by the Chief Internal Auditor providing Committee
with an update on the work of the Internal Audit Section.
In response to a question from the Chair asking what the process is for escalation of
outstanding actions, the Chief Internal Auditor advised where implementation dates
for particular recommendations require to be changed, Internal Audit agree a revised
date with the service which is then communicated to the Head of Service and Chief
Officer.  In terms of transparency the revised date is then reported back to this
Committee.  As a further update from an operational perspective, the Chief Officer
confirmed she had asked for an overview of all outstanding audit actions for regular
consideration by senior management team to ensure there was oversight of
implementation dates. 
Following consider the Committee unanimously agreed to note the contents of the
report.
9.         External Audit Plan for the Year Ending 2024-25 and Update on
Recommendations from 2023-24
The meeting had before it a report by the Chief Financial Officer informing the
Committee of the External Auditor's Annual Plan for 2024/25 and updating on the
recommendations following last years' audit.
Following consideration the Committee unanimously agreed to note the contents of
the External Auditor's Annual Plan for 2024/25 attached as Appendix 1 and update on
audit recommendations from 2023/24 attached as Appendix 3.
10.         Internal Audit Plan Year Ending 31 March 2026
The meeting had before it a report by the Chief Internal Auditor providing the
Committee with information on the proposed internal audit coverage for the 2025/26
financial year.
Page 7

Page 8

Following consideration the Committee unanimously agreed the proposed audit
coverage.
11.         Moray Integrated Community Equipment Store Audit
The meeting had before it a report by the Service Manager, Provider Services
updating the Committee on the last audit completed by the Internal Audit Section for
the Moray Integrated Community Equipment Store.
Following consideration the Committee unanimously agreed to:-
(i) note the outcome of the Internal Audit for the Moray Integrated Community
Equipment Store; and
(ii) note the work being undertaken to take forward the Audit Recommendations.
12.         Internal Audit Section - Completed Projects - NHS Grampian Reviews
[Para 6.2.5]
The meeting had before it a report by the Chief Internal Auditor providing Committee
with an update on the internal audit work completed on NHS Grampian systems and
practices.
Following consideration the Committee unanimously agreed to note the audit update.
Page 8

Page 9

MEETING OF MORAY INTEGRATION JOINT BOARD
AUDIT, PERFORMANCE AND RISK COMMITTEE
THURSDAY 27 MARCH 2025
ACTION LOG
Item
No.
Title of Report Action Required Due Date Action By Update for
19 June 2025
1. Q1 Performance
Report
Information to be provided about the support
that is on offer to staff to help improve their
wellbeing.
27 June 2024 Sean
Coady/
Natalie
Jeffrey
Due to new template
from Scottish
Government, new
HSCM H&S Delivery
Plan and Workforce
Delivery Plan now
scheduled for later
2025.
2. Q2 Performance
Report
Chief Officer to issue email update with
information relating to the rise in targets
detailed in Emergency Admissions graphs in
Appendix 1.
TBC Chief Officer In Progress
3. Q3 (Oct-Dec
2024)
Performance
Report – Adult
Services
Paragraph 5.12 – include evidence in future
reports of the effectiveness of the initiatives to
address staff absence specifically relating to
take-up and their impacts.
19 June 2025 Corporate
Programme
Manager
Item 4.
Page 9

Page 10

Item
No.
Title of Report Action Required Due Date Action By Update for
19 June 2025
4. Q3 Performance
Report for
Children and
Families and
Justice Social
Work
Chief Officer agreed to discuss with the Chair
and Depute Chair of the Board the most
suitable approach for Board to recommit to The
Promise following transfer of Children’s
Services from Council to MIJB.
TBC Chief Officer
Page 10

Page 11

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 19 JUNE 2025 
SUBJECT: QUARTER 4 (JANUARY - MARCH 2025) PERFORMANCE
REPORT – ADULT SERVICES 
BY:  CORPORATE PROGRAMME MANAGER 
1. REASON FOR REPORT 
1.1 To update the Committee on performance as at Quarter 4 2025 (January -
March). 
2. RECOMMENDATION 
2.1 It is recommended that the Committee consider and note: 
i) the performance of local indicators for Quarter 4 (January to
March 2025) as presented in the Performance Report at Appendix
1; 
ii) the analysis of indicators that have been highlighted and actions
being undertaken to address performance that is outside of
acceptable target ranges as detailed in Appendix 1;   
iii) the revised format of this report, which will continue to evolve in
future reporting periods. It is noted that different service areas
may be highlighted within each report, or as requested by the
Board; and 
iv) the inclusion of supplementary service information in Appendix 2,
which provides additional context and evidence to support the
mitigations outlined in relation to the national outcomes.  
3. BACKGROUND 
3.1   The purpose of this report is to ensure the Moray Integration Joint Board
(MIJB) fulfils its ongoing responsibility to ensure effective monitoring and
reporting on the delivery of services and on the programme of work as set out
in its Strategic Plan. 
3.2   Appendix 1 identifies local indicators for the MIJB and the functions
delegated by NHS Grampian and Moray Council, enabling broader scrutiny
and assurance by the Board.  
Item 5.
Page 11

Page 12

4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1  Local Indicators are assessed on their performance via a common
performance monitoring Red, Amber, and Green (RAG) traffic light rating
system. Some of these local indicators sit with acute, although can and do
impact our whole system. 
RAG scoring based on the following criteria:
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within agreed
tolerance.
RED If Moray is performing worse than target by more than agreed
tolerance. 
4.2 The detailed performance report for quarter 4 is attached in Appendix 1.   
Summary of Previously Agreed Indicators 
4.3 Performance within Health and Social Care Moray (HSCM) as demonstrated
by the agreed indicators up to the end of quarter 4 of the financial year
2024/25 are showing as not improving. Four indicators are presenting as
green; one is amber and six are red. 
4.4 Figure 1 provides a summary and the historical trends. A summary of
performance for each of the 6 reporting categories is provided below. 
EMERGENCY DEPARTMENT - AMBER
4.5 There was an increase in the rate per 1,000 this quarter to 22.0. This is a
slight increase the numbers presenting in the last 2 quarters but still below
March 2024 and the data has been trending down since then despite the
small increase in the most recent month. 
DELAYED DISCHARGES – RED   
4.6 The number of delays at the quarter 4 snapshot is up again to 40, which is up
from 33 in quarter 3 but down on the 43 recorded this time last year. 
4.7 Bed days lost due to delayed discharges increased to 1,149 this quarter, up
from quarter 3 but down from 1,501 in March 2024. 
EMERGENCY ADMISSIONS – GREEN
4.8 The rate of emergency occupied bed days for over 65s has reduced in the last
three months to 2,412 this quarter and is still down on the high of 2,749 in
quarter 4 2022/23. The emergency admission rate per 1000 population for
over 65s has decreased this quarter to 177.8 which is well below target and
the high in quarter 2 2023/24 of 189.9. Similarly, the number of people over 65
admitted to hospital in an emergency also had hit a high of 133.2 in quarter 2
2023/24 and despite an increase this quarter is below target at 125.7 in
quarter 4 2024/25. 
HOSPITAL RE-ADMISSIONS - GREEN
4.9 The 7-day re-admissions have increased to just over target at 3.9%, and the
28-day re-admissions have decreased further to well below target at 7.4%. 
Page 12

Page 13

MENTAL HEALTH – RED  
4.10 After an improvement in performance from 40% in January 2024 there has
been little variation in performance through the rest of 2024 and into 2025 with
65% of patients now being referred within 18 weeks at the end of quarter 4
2024/25. 
STAFF MANAGEMENT – RED   
4.11 Sickness absence for NHS employed staff has reduced to its lowest rate at
4.9% (end of Feb) at the end of quarter 4 2024/25. Council employed staff
sickness has remained high at 8.2% albeit slightly lower compared to the
same period last year. 
Page 13

Page 14

Figure 1 – Performance Summary 
Note: In order to match other national and local data sources indicators are showing the last month in the reporting quarter. 
Targets have been updated from Q1 2425 using average of activity for previous calendar year.
*From May 2022, the census figures for April 2021 onwards include delays due to infection control measures in place at hospital (delay reason codes 26X and 46X)
Page 14

Page 15

5. Areas Requiring Improvement  
Delayed Discharges - Red 
Situation 
5.1 In March 2025, delayed discharges rose to 40 — significantly higher than the
previous quarter but slightly below the Q4 2023/24 figure of 43. The average
through the quarter was 37 but the figure remains above the Scottish
Government target of 26 for Moray. Bed days occupied by delayed
discharges increased to 1,149 (from 981), in line with the rise in delays. The
primary cause of delayed discharges remain the delays in availability of care
and support in the community, particularly in rural areas. 
5.2 Community hospitals operated at 97.6% occupancy (Jan–Mar), with an
average stay of 71.7 days. Although length of stay has improved, patient
acuity remains high, increasing the risk of readmission, particularly among
frail, elderly individuals. 
5.3 Unmet need remains high at the end of Q4 with 31 people in hospital and 154
people in the community awaiting care amounting to 1,307 hours.  
The demand for care continues to exceed available resources. These figures
overall reflect ongoing whole-system pressures. 
Mitigation and Impact
•  Daily multi-disciplinary meetings support real-time collaborative decision-
making and system flow.
•  Surge beds were operational for 177 days (Nov–Mar), easing pressure
on acute and community services.
•  Enhanced scrutiny: All discharges over 90 days are discussed and
logged on Datix system with action plans in place.
•  The Strategic Care at Home workstream is focused on maximising care
delivery within budget.
•  Innovation and digital solutions: the Digital Health Institute (Growth Deal)
is researching technology-enabled care solutions to support independent
living.
•  Discharge Without Delay programme, in collaboration with NHS
Grampian and Health Intelligence Scotland is progressing with system
wide actions to reduce delays for people medically fit for discharge:
Phase One completed, including national self-assessment tool and action
planning.
• CQS payment changes have enabled provision of sustainable additional
care hours. 
• Proportionate care and telecare options are being expanded.
• Resource Allocation meetings are being redesigned for efficiency.
• Improved care home flow has reduced waits for long-term placements.
• Absence management is in place to stabilise workforce capacity. 
Page 15

Page 16

5.4 While challenges persist, targeted interventions and strategic programmes are
in place to improve flow, reduce delays, and support people to live well at
home. 
Mental Health – Red 
Situation
5.5 The demand for adult mental health and primary care psychological therapies
continues to exceed capacity.  Increasing decline in population mental health
means that demand continues to outstrip resource with ongoing uncertainty in
relation to primary care funding for psychological therapies delivery.  Delayed
discharges have improved, but complex cases remain difficult to place.
Medical staffing remains a key risk and remains on the Sector Risk Register. 
Mitigation 
•  Closer monitoring of waiting times is underway.
•  Group development and job planning aim to increase throughput and
maximise capacity.
•  Ward model changes in Ward 4 (e.g., single consultant model) are
improving patient flow.
•  Migration to a new reporting system (TRAK) will provide improved data
reporting. 
Staff Management – Red 
Situation
5.6 NHS staff sickness absence has dropped to 4.9%, the lowest since April 2023
and approaching the 4% target. However, Moray Council staff sickness has
increased to 8.2%, remaining significantly above target. 
5.7 Over the past year, NHS Grampian (NHSG) staff within HSCM have
consistently had higher absence rates than NHSG overall, peaking at 7.36%
in July 2024. Common causes of absence remain mental
health and musculoskeletal issues, with seasonal spikes in respiratory and
gastrointestinal illnesses during winter months. 
Mitigation 
• Vaccination campaigns for flu and COVID-19 aim to reduce severity and
duration of illness.
• Workstation assessments (DSE) are promoted for desk-based staff, with
ergonomic equipment provided as needed.
• Wellbeing Initiatives are promoted throughout the organisation and its
partners. NHS Grampian actively encourage the We Care website for
staff access to health and wellbeing resources. These are often
downloaded resources and are shared across HSCM.
• Occupational Health Service to provide support for both physical and
mental health issues.
• Safe Staffing Tools are used daily to monitor and manage workload and
reduce stress related absences in clinical areas. 
5.8   There are a number of services that contribute to addressing some of the
challenges faced across the system in relation to waiting lists for services or
accessing support in the community and Appendix 2 contains a snapshot of
Page 16

Page 17

impact achieved in relation to Community Appointment Days, Primary Care
activity in hours and out of hours, Volunteers recruitment and Unpaid carers.   
6. PERFORMANCE FRAMEWORK DEVELOPMENT 
6.1 Following the approval of the Strategic Delivery Plan by the Moray Integration
Joint Board (MIJB) on 29 May 2025 (para 8 of the draft minute refers), the
review of the performance management framework is now underway, with the
appointment of the Senior Performance Officer providing capacity to take this
forward. 
6.2 A refreshed set of performance indicators and reporting arrangements is
being developed to: 
• Ensure robust monitoring and governance
• Maintain a clear line of sight between activity and outcomes
• Support delivery of the strategic priorities set out in the new plan 
6.3 A strengthened performance framework will enable better decision-making,
accountability, and continuous improvement across the partnership. 
7. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement
Plan (LOIP)) and Moray Integration Joint Board Strategic Plan
“Moray Partners in Care 2022-2032”
Performance management reporting is a legislative requirement under
section 42 of the Public Bodies (Joint Working) (Scotland) Act 2014.   
In addition to publishing an Annual Performance Report, the Moray
Integration Scheme requires that the MIJB will “monitor the performance
of the delivery of integrated services using the Strategic Plan on an
ongoing basis” (para 5.2.2 of the Moray Integration Scheme refers). 
(b) Policy and Legal
There are no new policy or legal implications arising directly from this
report. The report is consistent with existing statutory duties and
governance arrangements. 
(c) Financial implications
There are no direct financial implications associated with this report.
However, performance insights may inform future resource planning and
prioritisation aligned with strategic objectives. 
(d) Risk Implications and Mitigation
While there are no immediate risks arising from this report, the long-term
impacts of COVID-19 on the health and social care system remain
uncertain. The performance framework will continue to be reviewed and
adapted to ensure responsiveness to emerging risks and system
pressures. 
There is also a risk that the MIJB may not deliver on the outcomes set
out in the Strategic Plan. Where such risks are identified, they will
Page 17

Page 18

be escalated and presented to the Board for appropriate oversight and
action. 
(e) Staffing Implications
While there are no direct staffing implications arising from this report, it is
important to acknowledge the ongoing challenges with recruitment and
staff absence across health and social care services. These workforce
pressures continue to impact the MIJB’s ability to deliver services in line
with strategic objectives
Recruitment difficulties, particularly in rural and specialist roles,
combined with high levels of sickness absence in some areas, pose
a significant operational risk. These issues are being monitored closely,
are considered within workforce planning, and service redesign efforts. 
(f) Property
There are no property implications directly associated with this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment (EIA) is not required for this report, as it
does not introduce or amend any policy or service that would directly
affect individuals with protected characteristics. However, performance
data may be used to inform future service improvements that promote
equity and inclusion. 
(h) Climate Change and Biodiversity Impacts
There are no direct climate or biodiversity implications arising from this
report. However, it is recognised that extreme weather events and rising
energy costs may increasingly impact service delivery, particularly in
rural areas. These factors will be considered in future strategic planning. 
(i) Directions
No new directions are required as a result of this report. 
(j) Consultations
Senior Management Team, Operational Management Team Health and
Social Care, Caroline O’Connor, Committee Services Officer, Moray
Council and their comments are incorporated in the report. 
8. CONCLUSION 
8.1 This report provides the MIJB with an overview of the performance of
specified Local indicators, outlines actions being undertaken to improve
performance in Section 4, and further expanded in Appendix 1. 
8.2 In addition, Appendix 2 includes supplementary service performance
data that offers further insight into operational activity and system
pressures, supporting a more comprehensive understanding of current
performance across the partnership. This performance report supports
the MIJB’s ongoing commitment to transparency, continuous
improvement, and delivery of the strategic outcomes set out in the
Moray Strategic Plan. 
Authors of Report: Jeanette Netherwood, Corporate Programme Manager
Page 18

Page 19

Sonya Duncan, Corporate Manager 
Background Papers: Available on request 
Page 19

Page 20

Appendix 1   
PERFORMANCE REPORT
SUPPORTING CHARTS 
QUARTER 4
2024/25 
(1 JANUARY 2025 – 31 MARCH 2025)  
Page 20

Page 21

Table of Contents  
Health and Social Care Moray - 1 - 2022-23 Quarter 1 Performance Report
1. TABLE OF CONTENTS
1. Table of Contents ............................................................................................................................. 1
1. Performance Summary .................................................................................................................... 2
Barometer Overview ........................................................................................................................... 2
2. Delayed Discharge - RED .................................................................................................................. 3
DD-01: Number of delayed discharges (including code 9, Census snapshot, at end of quarter) ....... 3
DD-02: Number of Bed Days Occupied by Delayed Discharges per quarter (inc code 9) per 1000
18+ population .................................................................................................................................... 3
3. Emergency Admissions - GREEN ...................................................................................................... 5
EA-01: Rate of emergency occupied bed days for over 65s per 1000 population .............................. 5
EA-02: Emergency Admissions rate per 1000 population for over 65s .............................................. 6
EA-03: Number of people over 65 years admitted as an emergency in the previous 12 months per
1000 population .................................................................................................................................. 7
4. Emergency Department – AMBER .................................................................................................. 8
AE-01: ED Attendance rates per 1,000 population (All Ages) ............................................................. 8
5. Hospital Re-admissions - AMBER .................................................................................................... 9
HR-01: Percentage of Emergency Re-admissions to hospital within 7 days - Moray Patients ........... 9
HR-02: Percentage of Emergency Re-admissions to hospital within 28 days - Moray Patients ....... 10
6. Mental Health – RED ..................................................................................................................... 11
MH-01: Percentage of patients commencing Psychological Therapy Treatment within 18 weeks of
referral ............................................................................................................................................... 11
7. Staff Management - RED ............................................................................................................... 12
SM-01: NHS Sickness Absence % of Hours Lost ................................................................................ 12
SM-02: Council Sickness Absence (% of Calendar Days Lost) ............................................................ 12
Appendix 1: Key and Data Definitions .................................................................................................. 14
RAG Scoring Criteria .......................................................................................................................... 14
Peer Group Definition ....................................................................................................................... 14
Appendix 2: Strategic Priorities............................................................................................................. 15
Appendix 3: National Health and Wellbeing Outcomes ....................................................................... 17 
Page 21

Page 22

Performance Summary  
Health and Social Care Moray - 2 - 2022-23 Quarter 1 Performance Report
1. PERFORMANCE SUMMARY
BAROMETER OVERVIEW 
Moray currently has 11 local indicators. Of these 4 are Green, one is Amber and 6 are Red. 
Figure 1 - Performance Summary                                                                         
Note: In order to match other national and local data sources indicators are showing the last month in the reporting quarter.
Targets have been updated from Q1 2024/25 using average of activity for previous calendar year.
MH and SM are LDP Standard Indicators and targets are set nationally so remain unchanged.                                                 
Q4 2324 Q1 2425 Q2 2425 Q3 2425 Q4 2425 New Target Previous Target
Jan-Mar Apr-Jun Jul-Sep Oct-Dec Jan-Mar (from Q1 2425) (from Q1 2324 or earlier)
AE Accident and Emergency
AE-01 A&E Attendance rate per 1000 population (All Ages) 22.6 21.5 22.6 19.7 22.0 21.9 21.7 A
DD Delayed Discharges
DD-01 Number of delayed discharges (including code 9) at census point 43 33 40 33 40 26 10 R
DD-02
Number of bed days occupied by delayed discharges (including code 9) at census
point 1501 922 1115 981 1149 850 304 R
EA Emergency Admissions
EA-01 Rate of emergency occupied bed days for over 65s per 1000 population 2509 2606 2603 2604 2412 2681 2320 G‚
EA-02 Emergency admission rate per 1000 population for over 65s 179.9 178.7 177.7 183.6 177.8 187 177 G‚
EA-03
Number of people over 65 years admitted as an emergency in the previous 12
months per 1000 population 125.8 124.2 123.8 127.5 125.7 131 121 G‚
HR Hospital Readmissions
HR-01 % Emergency readmissions to hospital within 7 days of discharge 4.4% 3.6% 4.6% 3.1% 3.9% 3.7% 3.9% R
HR-02 % Emergency readmissions to hospital within 28 days of discharge 8.3% 6.9% 8.9% 6.9% 7.4% 7.9% 8.4% G‚
MH Mental Health
MH-01
% of patients commencing Psychological Therapy Treatment within 18 weeks of
referral 57% 70% 60% 44% 65% no change 90% R
SM Staff Management
SM-01 NHS Sickness Absence (% of hours lost) 5.7% 7.0% 6.4% 7.0% 4.9% no change 4% R
SM-02 Council Sickness Absence (% of days lost) 9.7% 7.5% 7.3% 7.3% 8.2% no change 4% R                                                             
Health and Social Care Moray Performance Report                                          
Code Barometer (Indicator) RAG
Page 22

Page 23

Delayed Discharge - RED  
Health and Social Care Moray - 3 - 2022-23 Quarter 1 Performance Report
2. DELAYED DISCHARGE - RED
Trend Analysis 
The number of delays at the quarter 4 snapshot is up again to 40, which is up from 33 in quarter 3
but down on the 43 recorded this time last year.    
Bed days lost due to delayed discharges increased to 1,149 this quarter, up from quarter 3 but down
from 1,501 in March 2024. 
WDD-01: NUMBER OF DELAYED DISCHARGES (INCLUDING CODE 9, CENSUS
SNAPSHOT, AT END OF QUARTER)
Purpose 
Reliably achieving timely discharge from hospital is an important indicator of
quality and is a marker for person centred, effective, integrated, and harm
free care.
Strategic Priority  2: HOME FIRST Linked Indicator(s) DD-02
National Health & Wellbeing Outcomes 2, 3, 5, 7 
Figure 2 – Delayed Discharges 
Indicator Trend – Increasing
Source Public Health Scotland 
DD-02: NUMBER OF BED DAYS OCCUPIED BY DELAYED DISCHARGES PER QUARTER
(INC CODE 9) PER 1000 18+ POPULATION 
Page 23

Page 24

Delayed Discharge - RED  
Health and Social Care Moray - 4 - 2022-23 Quarter 1 Performance Report
Purpose  This monitors the number of people delayed in hospital once medically fit for
discharge. Longer stays in hospital are associated with increased risk of
infection, low mood, and reduced motivation.
Strategic Priority  2: HOME FIRST Linked Indicator(s) DD-01
National Health & Wellbeing Outcomes 2, 3, 5, 7 
Figure 3 – Delayed Discharge Bed-days 
Indicator Trend – Increasing
Source Public Health Scotland
Page 24

Page 25

Emergency Admissions - GREEN  
Health and Social Care Moray - 5 - 2022-23 Quarter 1 Performance Report
3. EMERGENCY ADMISSIONS - GREEN
Trend Analysis
The rate of emergency occupied bed days for over 65s has reduced in the last three months to 2,412
this quarter and is still down on the high of 2,749 in quarter 4 2022/23. 
The emergency admission rate per 1000 population for over 65s has decreased this quarter to 177.8
which is well below target and the high in quarter 2 2023/24 of 189.9. Similarly, the number of
people over 65 admitted to hospital in an emergency also had hit a high of 133.2 in quarter 2
2023/24 and despite an increase this quarter is below target at 125.7 in quarter 4 2024/25. 
EA-01: RATE OF EMERGENCY OCCUPIED BED DAYS FOR OVER 65S PER 1000
POPULATION
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a narrative when
viewed together of whether emergency admissions and bed days are within
tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) EA-02, EA-03
National Health & Wellbeing Outcomes 1, 2, 3, 5 
Figure 4 – Emergency Occupied Bed-days (Over 65s) 
Indicator Trend – Reducing
Source Health Intelligence  
Page 25

Page 26

Emergency Admissions - GREEN  
Health and Social Care Moray - 6 - 2022-23 Quarter 1 Performance Report
EA-02: EMERGENCY ADMISSIONS RATE PER 1000 POPULATION FOR OVER 65S
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a story when
viewed together of whether emergency admissions and bed days are within
tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) EA-01, EA-03 
National Health & Wellbeing Outcomes  1, 2, 3, 5 
Figure 5 – Emergency Admissions (Over 65s) 
Indicator Trend – Steady
Source Health Intelligence  
Page 26

Page 27

Emergency Admissions - GREEN  
Health and Social Care Moray - 7 - 2022-23 Quarter 1 Performance Report
EA-03: NUMBER OF PEOPLE OVER 65 YEARS ADMITTED AS AN EMERGENCY IN THE
PREVIOUS 12 MONTHS PER 1000 POPULATION
Purpose  EA-01, EA-02, and EA-03 are all interconnected and provide a story when
viewed together of whether emergency admissions and bed days are within
tolerance and indicate where potential risks could arise.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) EA-01, EA-02
National Health & Wellbeing Outcomes 1, 2, 3, 5 
Figure 6 – Number of Over 65 People Emergency Admissions 
Indicator Trend – Increasing
Source Health Intelligence  
Page 27

Page 28

Emergency Department – AMBER  
Health and Social Care Moray - 8 - 2022-23 Quarter 1 Performance Report
4. EMERGENCY DEPARTMENT – AMBER
Trend Analysis 
There was an increase in the rate per 1,000 this quarter to 22.0. This is a slight increase the
numbers presenting in the last 2 quarters but still below March 2024 and the data has been
trending down since then despite the small increase in the most recent month. 
AE-01: ED ATTENDANCE RATES PER 1,000 POPULATION (ALL AGES)
Purpose  A greater system-wide understanding of how people access emergency care,
and why certain choices are made, will allow local health systems to develop
intelligence about avoidable attendances at emergency departments and
target their responses. 
Strategic Priority  3: PARTNERS IN CARE Linked Indicator(s) HR-01, HR-02
National Health & Wellbeing Outcomes  1, 2, 3, 5 
Figure 7 – ED Attendance Rate 
Indicator Trend – Decreasing
Source Health Intelligence  
Page 28

Page 29

Hospital Re-admissions - AMBER  
Health and Social Care Moray - 9 - 2022-23 Quarter 1 Performance Report
5. HOSPITAL RE-ADMISSIONS - AMBER
Trend Analysis 
The 7-day re-admissions have increased to just over target to 3.9%, and the 28-day re-admissions
have decreased further to well below target at 7.4%. 
HR-01: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO HOSPITAL WITHIN 7 DAYS -
MORAY PATIENTS
Purpose  Re-admissions are often undesirable for patients and have also been shown
to be associated with the quality of care provided to patients at several
stages along the clinical pathway, including during initial hospital stays,
transitional care services and post-discharge support.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) HR-02, AE-01
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 8 – 7-dayEmergency Readmissions 
Indicator Trend – Stable
Source Health Intelligence  
Page 29

Page 30

Hospital Re-admissions - AMBER  
Health and Social Care Moray - 10 - 2022-23 Quarter 1 Performance Report
HR-02: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO HOSPITAL WITHIN 28 DAYS
- MORAY PATIENTS
Purpose  Re-admissions are often undesirable for patients and have also been shown
to be associated with the quality of care provided to patients at several stages
along the clinical pathway, including during initial hospital stays, transitional
care services and post-discharge support. (This measure lags by a month due
to the time required for a potential 28 day discharge to occur)
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) HR-01, AE-01
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 9 – 28-day Emergency Readmissions 
Indicator Trend – Decreasing
Source Health Intelligence
Page 30

Page 31

Mental Health – RED  
Health and Social Care Moray - 11 - 2022-23 Quarter 1 Performance Report
6. MENTAL HEALTH – RED 
Trend Analysis 
After an improvement in performance from achieving a low 40% in January 2024 there has been
little variation in performance through the rest of 2024 and into 2025 with 65% of patients now
being referred within 18 weeks at the end of quarter 4 2024/25. 
MH-01: PERCENTAGE OF PATIENTS COMMENCING PSYCHOLOGICAL THERAPY
TREATMENT WITHIN 18 WEEKS OF REFERRAL
Purpose  Timely access to healthcare is a key measure of quality and that applies
equally in respect of access to mental health services.
Strategic Priority  3: PARTNERS IN CARE Linked Indicator(s) 
National Health & Wellbeing Outcome  1, 2, 3, 5 
Figure 10 – Psychological Therapy Treatment within 18 Weeks 
Indicator Trend – Steadily decreasing
Source Health Intelligence  
Page 31

Page 32

Staff Management - RED  
Health and Social Care Moray - 12 - 2022-23 Quarter 1 Performance Report
7. STAFF MANAGEMENT - RED
Trend Analysis 
Sickness absence for NHS employed staff has reduced to 4.9% (end of Feb) at the end of quarter 4
2024/25. Council employed staff sickness has remained high at 8.16% which is still low when
compared last year. 
SM-01: NHS SICKNESS ABSENCE % OF HOURS LOST
Purpose  Attendance at work of all employees is essential in the interests of the
effective and efficient operation of services.
Strategic Priority  1: BUILDING RESILIENCE  Linked Indicator(s) SM-02
National Health & Wellbeing Outcome  8 
Figure 11 – NHS Sickness Absence 
Indicator Trend – Steadily increasing
Source Health Intelligence 
SM-02: COUNCIL SICKNESS ABSENCE (% OF CALENDAR DAYS LOST)
Purpose  Attendance at work of all employees is essential in the interests of the
effective and efficient operation of services.
Strategic Priority  1: BUILDING
RESILIENCE  Linked Indicator(s) SM-01
National Health & Wellbeing Outcome  1, 2, 3, 5
Page 32

Page 33

Staff Management - RED  
Health and Social Care Moray - 13 - 2022-23 Quarter 1 Performance Report 
Figure 12 – Moray Council Sickness Absence 
Indicator Trend – Decreasing but high
Source Council HR 
Page 33

Page 34

Staff Management - RED  
Health and Social Care Moray - 14 - 2022-23 Quarter 1 Performance Report
APPENDIX 1: KEY AND DATA DEFINITIONS
RAG SCORING CRITERIA
GREEN If Moray is performing better than target.
AMBER If Moray is performing worse than target but within specified
tolerance.
RED If Moray is performing worse than target but outside of specified
tolerance. 
PEER GROUP DEFINITION
Moray is defined as being in Peer Group 2 in the Local Government Benchmarking Framework 
Family Group 1 Family Group 2 Family Group 3 Family Group 4
East Renfrewshire
East Dunbartonshire
Aberdeenshire
Edinburgh, City of
Perth & Kinross
Aberdeen City
Shetland Islands
Orkney Islands
Moray
Stirling
East Lothian
Angus
Scottish Borders
Highland
Argyll & Bute
Midlothian
Falkirk
Dumfries & Galloway
Fife
South Ayrshire
West Lothian
South Lanarkshire
Renfrewshire
Clackmannanshire
Eilean Siar
Dundee City
East Ayrshire
North Ayrshire
North Lanarkshire
Inverclyde
West Dunbartonshire
Glasgow City 
Page 34

Page 35

Staff Management - RED  
Health and Social Care Moray - 15 - 2022-23 Quarter 1 Performance Report
APPENDIX 2: STRATEGIC PRIORITIES 
Page 35

Page 36

Staff Management - RED  
Health and Social Care Moray - 16 - 2022-23 Quarter 1 Performance Report 
•EA-01: RATE OF EMERGENCY OCCUPIED BED DAYS FOR OVER
65S PER 1000 POPULATION
•EA-02: EMERGENCY ADMISSIONS RATE PER 1000 POPULATION
FOR OVER 65S
•EA-03: NUMBER OF PEOPLE OVER 65 YEARS ADMITTED AS AN
EMERGENCY IN THE PREVIOUS 12 MONTHS PER 1000
POPULATION
•HR-01: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO
HOSPITAL WITHIN 28 DAYS - MORAY PATIENTS
•HR-02: PERCENTAGE OF EMERGENCY RE-ADMISSIONS TO
HOSPITAL WITHIN 7 DAYS - MORAY PATIENTS
•SM-01: NHS SICKNESS ABSENCE % OF HOURS LOST
•SM-02: COUNCIL SICKNESS ABSENCE (% OF CALENDAR DAYS
LOST)
BUILDING
RESILIENCE 
•DD-01: NUMBER OF DELAYED DISCHARGES (INCLUDING CODE 9,
CENSUS SNAPSHOT, AT END OF QUARTER)
•DD-02: NUMBER OF BED DAYS OCCUPIED BY DELAYED
DISCHARGES PER QUARTER (INC CODE 9) PER 1000 18+
POPULATION 
•UN-01: NUMBER OF LONG-TERM HOME CARE HOURS UNMET
AT WEEKLY SNAPSHOT
•UN-02: NUMBER OF PEOPLE WITH LONG-TERM CARE HOURS
UNMET AT WEEKLY SNAPSHOT
HOME
FIRST
•OA-01: NUMBER OF REVIEWS OUTSTANDING AT END OF
QUARTER SNAPSHOT
•MH-01: PERCENTAGE OF PATIENTS COMMENCING
PSYCHOLOGICAL THERAPY TREATMENT WITHIN 18 WEEKS OF
REFERRAL
•AE-01: A&E ATTENDANCE RATES PER 1000 POPULATION (ALL
AGES)
PARTNERS
IN CARE 
Page 36

Page 37

Staff Management - RED  
Health and Social Care Moray - 17 - 2022-23 Quarter 1 Performance Report
APPENDIX 3: NATIONAL HEALTH AND WELLBEING OUTCOMES
1 - PEOPLE ARE ABLE TO LOOK AFTER AND IMPROVE THEIR OWN HEALTH AND WELLBEING
AND LIVE IN GOOD HEALTH FOR LONGER. 
2 - PEOPLE, INCLUDING THOSE WITH DISABILITIES OR LONG-TERM CONDITIONS, OR WHO ARE
FRAIL; ARE ABLE TO LIVE, AS FAR AS REASONABLY PRACTICABLE, INDEPENDENTLY AT HOME,
OR IN A HOMELY SETTING IN THEIR COMMUNITY. 
3 - PEOPLE WHO USE HEALTH AND SOCIAL CARE SERVICES HAVE POSITIVE EXPERIENCES OF
THOSE SERVICES, AND HAVE THEIR DIGNITY RESPECTED. 
4 - HEALTH AND SOCIAL CARE SERVICES ARE CENTRED ON HELPING TO MAINTAIN OR
IMPROVE THE QUALITY OF LIFE OF PEOPLE WHO USE THOSE SERVICES. 
5 - HEALTH AND SOCIAL CARE SERVICES CONTRIBUTE TO REDUCING HEALTH INEQUALITIES. 
6 - PEOPLE WHO PROVIDE UNPAID CARE ARE SUPPORTED TO LOOK AFTER THEIR OWN
HEALTH AND WELLBEING, INCLUDING TO REDUCE ANY NEGATIVE IMPACT OF THEIR CARING
ROLE ON THEIR OWN HEALTH AND WELLBEING. 
7 - PEOPLE USING HEALTH AND SOCIAL CARE SERVICES ARE SAFE FROM HARM. 
8 - PEOPLE WHO WORK IN HEALTH AND SOCIAL CARE SERVICES FEEL ENGAGED WITH THE
WORK THEY DO AND ARE SUPPORTED TO CONTINUOUSLY IMPROVE THE INFORMATION,
SUPPORT, CARE, AND TREATMENT THEY PROVIDE. 
9 - RESOURCES ARE USED EFFECTIVELY AND EFFICIENTLY IN THE PROVISION OF HEALTH AND
SOCIAL CARE SERVICES.
Page 37

Page 38

APPENDIX 2 
Supplementary Service Data Supporting Performance Mitigations 
Allied Health Professionals (AHP) Performance 
Community Appointment Days (CAD) 
Waiting lists for AHP services were at unprecedented levels post Covid-19 due to
demand and backlog. 
Waiting List Pre CAD  Post CAD
Physiotherapy 262 138
Podiatry 267 172  
The Putting People First Framework supports NHSG’s Plan for the Future, aiming to
create a sustainable healthcare system over the next 10 years. The Framework
details the need to test and deliver innovative Community Led Health approaches,
with CADs being a recommendation. 
The aim of the CAD is to enhance both patient and staff experience, by moving away
from treatment led care, aligning with and promoting a holistic and Realistic Medicine
approach; giving those invited to attend the opportunity to discuss what matters to
them most. 
Mitigation 
Results from the first CAD: 
Podiatry CAD
• 48 patients attended
Outcomes:
• 48 completed patient passports
• 8 discharged on the day
• 9 follow up appointments booked
• 31 placed on patient-initiated review (PIR)
• Total discharges: 39
• After 6 months 6 patients contacted service following PIR 
MSK Physiotherapy CAD
• 91 appointments made, 79 attended
Outcomes:
• 87 completed patient passports
• 14 discharged on the day
• 34 follow-up appointments booked
• 31 placed on patient-initiated review
• Total discharges: 45, significantly reducing the waiting list 
(Patient passports are a record of information that is important to the person, not
necessarily clinical information) 
Page 38

Page 39

CADs are proving effective in reducing waiting lists and improving patient
satisfaction. They align with national policy and local strategic goals for sustainable,
community-based care. CADs will continue to be rolled out across services,
supporting: 
• Locality-based care
• Reduced waiting times
• Enhanced patient experience
• Alignment with the Moray Health and Social Care Partnership’s strategic priorities 
Feedback Received: 
“Today was so much more than getting my foot looked at. Whoever did this pilot
deserves a medal- the whole experience has been brilliant for me… I am buzzing –
thank you everyone” 
“I got lots of information which has helped with my confidence, motivation and mental
health” 
Primary Care  
Situation
December was the busiest month for Primary Care in Grampian. In-hours activity in
Moray is among the highest in Scotland, with 836 direct encounters per 1,000
population, compared to the national average of 512. 
Area Total encounters  per 1000 Direct encounters  per 1000
Aberdeen City 1806 480
Aberdeenshire 2029 569
Moray 2025 836
Grampian 1967 579
Scotland 1357 512 
Out-of-hours (OOH) consultations dropped by 9% year-on-year and 4% compared to
the 2024 average. A&E attendances fell by 3% year-on-year and are 0.4% below the
2024 average. These reductions contrast with rising national trends, suggesting that
high in-hours activity is effectively alleviating pressure on urgent and emergency
services. 
Moray’s strong in-hours performance is helping reduce demand on OOH and A&E
services, demonstrating the value of accessible, timely primary care. 
However, while primary care continues to demonstrate resilience and high levels of
activity, it is important to acknowledge that not all aspects are without concern.
Challenges around GP recruitment, retention, and increasing workload
pressures remain significant and may impact service sustainability in the near future. 
Mitigation
Page 39

Page 40

• Primary Care Improvement Plans and workstreams to support Primary Care
In Hours activity are ongoing.
• The GP Vision Programme is proposing plans to shape future sustainability.
• A pan-Grampian application has been submitted for a Hospital at
Home pathway (PATH – Preventing Admissions and Transitioning Home),
which will:
• Expand existing teams
• Support early discharge and admission avoidance
• Align with strategic priorities of HSCM, MIJB, and NHS Grampian, and the
Grampian GP Vision programme. 
Primary Care Out of Hours (GMED) Update 
In 2024, GMED managed 107,608 cases, representing a 4% reduction in demand
compared to 2023 (112,148 cases). 
This activity included:
• 58,634 advice calls
• 34,656 centre consultations
• 11,128 home visits
• 3,190 mental health advice calls 
Despite the recent decline, overall GMED activity has increased by 35.6% since
2020, reflecting sustained pressure on primary care services. The busiest locations
in Moray remain Elgin, Forres, and Buckie. 
Moray, with a population of approximately 95,700, accounted for 24,329 contacts in
2024, 22.6% of all GMED activity. This highlights the significant reliance on out-of-
hours services within the locality. 
Impact on Secondary Care 
GMED continues to play a critical role in managing demand and acting as
a gatekeeper to secondary care. In 2024, 6,049 patients were admitted to
hospital via GMED — a 19.5% decrease from 2023 (7,510 admissions) and a 31.4%
reduction compared to pre-COVID levels in 2019 (8,822 admissions). 
GMED’s ability to manage increasing demand while reducing hospital admissions
demonstrates its effectiveness in supporting system flow, reducing pressure on
acute services, and aligning with the strategic aim of delivering the right care in the
right place at the right time. 
Volunteers 
Situation
Between January and March 2025, 231 volunteers contributed 4,105 hours of
support across hospitals, The Oaks Palliative Centre, and community settings. 
Volunteers are a valued part of our workforce, contributing meaningfully to patient
and community wellbeing. Despite national trends showing a decline in formal
Page 40

Page 41

volunteering (18% participation in the 2023 Scottish Household Survey), Moray has
maintained exceptional retention rates: 
• 84.89% (2022–2023)
• 90.68% (2023–2024)
• 
This far exceeds national averages and reflects strong engagement and satisfaction.
Departures were for positive reasons such as employment or retirement. 
Volunteer milestones (2024–2025):
• 9 volunteers reached 3 years of service
• 4 reached 5 years
• 7 reached 10 years
• 10 volunteers progressed into healthcare careers 
High retention and progression into healthcare careers demonstrate the strategic
value of volunteering in workforce development, community resilience, and citizen
engagement. 
Volunteering in 2023 - Findings from the Scottish Household Survey 
Mitigation
• All volunteers undergo robust induction, PVG checks, and sign confidentiality
agreements.
• Risk assessments are in place for all environments.
• Oversight is maintained at both local and pan-Grampian levels.
• Staff-side and union partners are engaged to ensure appropriate use and
support of volunteers.
• Ongoing recruitment campaigns are in place to sustain the programme.
• Strategic alignment: Volunteering supports the Moray Health and Social Care
Partnership’s goals of enhancing community-based care, building local
capacity, and improving outcomes for citizens through meaningful
engagement. 
Unpaid Carers 
Situation
Unpaid carers are recognised as a vital part of the health and social care system.
Support for carers is delivered in partnership with Quarriers, who provide Adult Carer
Support Plans (ACSPs) and Young Carer Statements (YCSs). 
Below is the data for Quarriers Unpaid carer assessments. 
Quarriers  Adult carer support plan  Young carer statements 
Apr-Jun 24 38 21
Jul-Sep 24 21 13
Oct-Dec 24 33 15
Jan-Mar 25 41 11
Totals 133 60 
Page 41

Page 42

In Q4, 41 ACSPs were completed, with an additional 4 awaiting authorisation, the
highest quarterly total in year. This reflects improved capacity and responsiveness in
identifying and supporting unpaid carers.
Timely identification and support of unpaid carers is essential to sustaining caring
roles and preventing carer breakdown, which directly supports the strategic aim of
enabling people to live well at home and in their communities. 
Mitigation 
A variation to the contract with Quarriers was implemented on 1st January 2025,
however, due to recruitment challenges, the transition will only start to realise the
benefits in the next quarter. Responsibility for completing ACSPs and YCSs will
transfer from Quarriers to a newly appointed Social Worker (Unpaid Carers). This
change will:
• Allow Quarriers to focus on direct support for carers of all ages
• Improve efficiency and consistency in assessment delivery
• Strengthen alignment with statutory duties under the Carers (Scotland) Act 2016
Strategic alignment: This transition supports the Partnership’s commitment to early
intervention, prevention, and person-centred care. 
Page 42

Page 43

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 19 JUNE 2025 
SUBJECT: QUARTER 4 (JANUARY TO MARCH 2025) PERFORMANCE
REPORT FOR CHILDREN AND FAMILIES AND JUSTICE SOCIAL
WORK 
BY:      INTERIM CHIEF SOCIAL WORK OFFICER/HEAD OF SERVICE 
1. REASON FOR REPORT 
1.1 To inform the Committee on Children and Families and Justice Social Work
performance as at Quarter 4 (January to March 2025). 
2. RECOMMENDATIONS 
2.1 It is recommended Committee scrutinises and notes: 
i) the performance of local indicators for Quarter 4 as presented in
the Performance Report at Appendix 1; and 
ii) the analysis of the local indicators as detailed in Appendix 1. 
3. BACKGROUND 
3.1 The purpose of this report is to inform Moray Integration Joint Board (MIJB) of
the quarterly performance data which provides the analysis of the delivery of
Children, Families and Justice Social Work services. 
3.2 Appendix 1 identifies local indicators for the MIJB and the functions
delegated by NHS Grampian and Moray Council for Children, Families and
Justice Social Work services to allow wider scrutiny by the Board. 
4. SUMMARY 
4.1 Work is underway to develop and agree the refresh of Moray’s key
performance indicators to enable recording of local data and measures set
against the national performance indicators. 
4.2 Appendix 1 provides a summary and the historical trends: 
• Child Protection activity
• Looked after Children 
• Justice and Youth Justice 
Item 6.
Page 43

Page 44

4.3 Statistics for Child Protection activity are provided against the academic
calendar which runs from August to July annually.  This is because this data is
gathered and analysed by the Children’s Services Partnership and reported to
the Child Protection Committee (CPC) through the Child Protection Minimum
Data Set.  Appendix 1 begins with Child Protection Q2 from page 1 to 11,
Financial Q4 data is from page 12 to 31.  Any trends or anomalies in this data
are considered through the CPC Data Sub-group and reported accordingly. 
4.4 Statistics for Looked After Children, Justice and Youth Justice are reported
over the financial year which runs from April to March which is the reporting
calendar for this data.  A summary of performance for each of the reporting
categories is provided below. 
Child Protection activity
4.5 At the end of this Child Protection (CP) Quarter 2, 60 children were registered
on the North East Child Protection Register (NECPR).  There is no reliable
way of comparing data with other areas before this information is officially
published nationally. The data for Moray can be considered and interrogated
against the trends over previous years until national data is published. 
Looked After Children
4.6 At the end of Financial (Fin) Quarter 4, the number of looked after children is
171.  This includes 6 New Scots (formally Unaccompanied Asylum-Seeking
Children (UASC)) and 5 children who are cared for on a part time basis (Short
Breaks). 
4.7 92.7% (51/55) of children in foster care are cared for by Moray Council foster
carers.  The Carer Recruitment Campaign continues to focus on recruitment
of foster carers and supported lodgings carers.  Resultantly, there has been
increased capacity to have children and young people cared for by Moray
Council foster carers.  Thus, reducing the need to purchase external agency
care.  The Carer Recruitment Campaign is continuing where it is anticipated
that the use of in-house carers will increase.         
4.8 The target for children living with kinship carers is adjusted annually to the
average of comparator authorities which was 28% for 2022/23 (this is a more
than target based on the assumption Kinship care is preferable, where it is
safe and appropriate, to non-family care).  Currently 22.9% of looked after
children in Moray are in approved Kinship care with family members.  Moray
is currently 5.1% below this average.  Resultantly, work is being undertaken to
strengthen practice, ensuring children, at the point of allocation, have a
holistic extended family map produced, regularly updated, providing clear
information on Kinship care options in the event short breaks or alternative
care may be necessary in the future. 
4.9 19.8% (34/171) of Looked After Children are cared for in residential care.  The
target for this indicator (this is a less than target based on the assumption
foster care and kinship care will be the preferred option when it is safe and
appropriate, where possible) is adjusted annually to the average of
comparator authorities (17.5% for 2022/23).  This figure includes five young
people who are cared for on a part-time (short breaks) basis.  For illustrative
purposes on performance, excluding those who have short breaks (children
and young people who are in the care of their families) the figure is 16.9%
(29/171) which is 0.6% lower than the average of comparator authorities. 
Page 44

Page 45

However, in common with most of the comparator local authorities, Moray is
higher than the Scotland national average percentage of 10%. 
4.10 86% of brothers and sisters remain together in care.  The Maintaining
Relationships Project is developing an approach and policy to ensure brothers
and sisters can remain together as far as possible and where this is their
assessed needs.  Due to resource limitations, this is much more difficult to
achieve when there is need to accommodate large family groups. 
4.11 For New Scots, Moray has not adopted the residential homes model used by
other local authorities.  Moray’s model comprises of a combination of local
authority housing and supported lodgings care and support.  As such, the
uncertainty regarding the future numbers of New Scots should not have an
impact on residential care capacity for Moray. 
4.12 Statistically it is difficult to ascertain how other authorities record their
numbers as the level of detail is not readily available.  While nationally
significant, the numbers of looked after children are comparatively small which
means percentage baselines do not always provide meaningful comparison. 
An example of this is that in Moray, all New Scots and Short-term breaks are
included within Looked After numbers.  Not all comparator authorities do this,
so an exercise is being undertaken to consider what is being recorded by
them. 
Justice and Youth Justice 
4.13 At the end of Financial (Fin) Quarter 4, there were 539 people supported by
Justice and Youth Justice Services of whom 46 are “care experienced” young
people (CEYP), Youth Justice 15 and Justice 31. 
4.14 Overall, the number of CEYP in Justice and Youth Justice Social Work has
been on a reducing trend from 13% at the end of March 2021 to 8.5% at the
end of Fin Quarter 4.  There has been a slight increase of 0.12% from Fin
Quarter 3 and work continues to identify and support care experienced young
people in these services, to offer early support where possible and reduce the
risk of re-offending. 
4.15 Most individuals supported by Youth Justice and Justice Social Work are male
(86.5% Justice Social Work, 83.7% Youth Justice).  Gender responsive
support is offered to females taking account of research and data indicating
women in the justice system are more likely to have experienced trauma and
more likely to be a sole carer of a child or family member. 
4.16 The Justice Social Work Service submitted 100% of reports to Court by their
due date.  This includes requests from Moray’s local Court and nationally. 
5. KEY MATTERS RELEVANT TO RECOMMENDATION 
5.1 Detailed charts and performance indicator data is attached in Appendix 1. 
6. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
Page 45

Page 46

This report notes that a review of key performance indicators is currently
being developed in respect of the wider service functions that will align
with key priority areas across the Children’s Services partnership. 
(b) Policy and Legal
None arising as a direct result of this report. 
(c) Financial implications
None arising as a direct result of this report. 
(d) Risk Implications and Mitigation
None arising as a direct result of this report. 
(e) Staffing Implications
There are no proposed changes to the staffing or reporting relationships. 
(f) Property
None arising as a direct result of this report. 
(g) Equalities/Socio Economic Impact
None arising as a direct result of this report. 
(h) Climate Change and Biodiversity Impacts
None arising as a direct result of this report. 
(i) Directions
None arising as a direct result of this report. 
(j) Consultations
Children, Families and Justice Social Work Senior Management Team. 
7. CONCLUSION 
7.1 This report provides Committee with an overview of the performance of
specified local and National indicators. 
Author of Report:  Jim Lyon, Interim Chief Social Work Officer/Head of Service  
Background Papers:  Appendix 1
Page 46

Page 47

APPENDIX 1
1 | P a g e
CHILDREN & FAMILIES AND JUSTICE SOCIAL WORK - QUARTER 4 (JAN-MAR 2025)
PERFORMANCE REPORT
PLEASE NOTE THIS REPORT IS SPLIT INTO TWO SECTIONS. THE FOLLOWING SECTION USES
THE ACADEMIC CALENDAR (1 AUG – 31 JULY).  THE INFORMATION PRESENTED REPRESENTS
CHILD PROTECTION (CP) QUARTER 2 WHICH IS LATEST AVAILABLE DATA (NOV 2024 - JAN
2025).
At the end of the CP Quarter 2, 643 contacts, enquiries and referrals were made to the
Access Team for 573 children (as per graph 1).
Graph 1: CP Quarter 2 - Referrals received by Access Team
The potential referral
routes are Social Work,
SCRA, Police, Courts,
Education, Health, 3rd
Sector, community, family
and young person.  When a
referral has been received
it can be categorised as:
IRD – immediate child
protection concerns.
Enquiry – information
gathering to determine
next steps (if any).
Assessment of need – team
will conduct a child in need
assessment.
Number of contacts, enquiries and referrals can be more than the number of children, as
they can come from a range of sources about the same child.
Future reporting shall identify accepted referrals which is the key process for consideration
of the need for follow up actions.
Pie chart 1: Sources of referral
201 183
259
172 160
241
0
50
100
150
200
250
300
Nov-24 Dec-24 Jan-25
Referrals
Referrals: No. in last month
Referrals: No of children
Page 47

Page 48

APPENDIX 1
2 | P a g e
In CP Quarter 2, 31.6% of referrals were from the Police (204), followed by Education 23.4%
(151), Family and Community 17.5% (113), Health and Social Work 17.2% (111), and 9.9%
coming from other professionals (64) (as per pie chart 1).  Where the number of referrals is
higher than the number of children, this can be attributed to the fact there can be multiple
sources of referrals about a child (e.g. Health, Education and Police).  This potentially reflects
consistent thresholds across the partnership.
There has been a 30% increase in referrals from education since CP Quarter 1.  The Service
Manager is discussing this with Quality Improvement Manager in Education, to agree actions
for clarity on the threshold of need, support to families at the right time from the right
service and to understand the increase in more detail.
Graph 2: IRDs and number of children subject to an IRD 
Graph 2 shows the quarterly trend in IRDs (between 1 Aug 2023 and 31 Jan 2025).  In CP
Quarter 2, 66 children were involved in 40 IRDs.  Of the 66 children, five had been subject to
two or more IRDs throughout this quarter (7.59%).  For each quarter, the number of children
is greater than the number of IRDs as each IRD can consider multiple children within a
family.
204
151
113
111
64
Sources of Referral
Police
Education
Family &
Community
Health and Social
Work
Other Agency
66 65 63
47 47 40
125
105
89 84
64 66
0
20
40
60
80
100
120
140
Q1 Q2 Q3 Q4 Q1 Q2
No. of IRDs and Children involved
No. of  IRDs held in Quarter No. of Children involved
Page 48

Page 49

APPENDIX 1
3 | P a g e
An interagency referral discussion (IRD) is a co‑ordinated inter-agency protective process
until the point a child protection planning meeting (CPPM) is held, or until a decision is made
that such a meeting is not required or alternative action is required. 
Pie chart 2: Main reasons for IRD 
As per chart above, throughout CP Quarter 2, physical assault remains a consistent reason
for an IRD being held (27, 40.9%), followed by child sexual exploitation (12, 18.1%), sexual
assault (11, 16.6%), domestic abuse (8, 12.1%), mental health (4, 6.%), neglect (2, 3%), child
criminal exploitation (1, 1.5%) and other (1, 1.5%).               
Pie chart 3: Child protection concerns
27
12
11
8
4
2 1 1 Reasons for IRD
Physical Assault
Child Sexual Expl
Sexual Assault
Domestic Abuse
Mental Health
Neglect
Child Criminal Expl
Other reason
Page 49

Page 50

APPENDIX 1
4 | P a g e
During CP Quarter 2, Parental Drug Use, Domestic Abuse, Neglect, and Child affected by
parent or carer mental ill health, are the main child protection concerns. *Note there may be
more than one concern documented for each child.
Following the IRDs, six Initial Child Protection Planning Meetings were convened, and 28
Joint Investigative Interviews were requested. 
Graph 3: Joint Investigative Interviewing 
Graph 3 shows the trend across the years 2023/25 for joint investigative interviews and
Scottish Child Investigative Interviews. 
Graph 4 – JII & SCIM 
24
23
23
16
11
7
5 4 3 2
CP Concerns as at 31 Jan 25
Parental Drug Misuse
Domestic Abuse
Neglect
Child Affected by
Parent/Carer Mental Ill-
HealthEmotional Abuse
Other Concern(s)
Services Finding It Hard
to Engage
Parental Alcohol Misuse
16
26
9 12 12 9 7 7
13 10
4 7 9 7 11
5
12
13 22 8 11 9 6 7 7 13 9 4 7 9 7 11 5 12
3 4
1 1 3
0 0 0 0 1 0 0 0 0 0 0 0
0
5
10
15
20
0
5
10
15
20
25
30
JIIs using Scottish Child Interview Model
(SCIM)
JII: No. of children subject to a JII as decision of IRD
JII: No. of JII by SCIM as decision of IRD
JII: No. of JII by 5 day process as decision of IRD
JII: No. of children who declined/or did not complete JII
JIIs: No. of SCIM JIIs undertaken
Page 50

Page 51

APPENDIX 1
5 | P a g e
Graph 4 shows the activity of Joint Investigative Interviewing across CP Quarter 2, during
which 28 children were recommended for Joint Investigative Interview (JII); 18 SCIM JIIs
were completed and ten children either declined or a different form of interview was carried
out. 
Graph 5: Initial Child Protection Planning Meetings 
Graph 5 shows the trend across the last three reporting years (2021 - 2025) for the number
of Initial and Pre-birth Child Protection Planning Meetings, and the number of children. The
number of children subject to CPPMs is higher than the number of meetings held, due to
some meetings considering sibling groups.
7
9
7
11
5
12
7
9
7
11
5
12
3
1
2
4
3 3
4
8
5
7
2
9
0
2
4
6
8
10
12
14
Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25
JIIs using SCIM
JII: No. of children subject to a JII as decision of IRD
JII: No. of JII by SCIM as decision of IRD
JII: No. of JII by 5 day process as decision of IRD
JII: No. of children who declined/or did not complete JII
0
5
10
15
20
25
30
35
40
45
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
2021/22 2022/23 2023/24 2024/25
No. of children and ICPPMs and Pre-Birth CPPMs
Number of children subject to Initial and Pre-Birth CPPMs Number of Initial and Pre-Birth CPPMs
Page 51

Page 52

APPENDIX 1
6 | P a g e
At the end of CP Quarter 2, six Initial and Pre-birth Child Protection Planning Meetings were
held for ten children, all of whom were placed on the register.
Graph 6: Conversions from IRD to ICCPM 
Graph 6 above shows the trend from 2021 through to 2025 and specifically CP Quarter 2,
where the conversion rate from ICPPM to Child Protection Registration was 100%.
A small percentage of children discussed in IRDs progress to ICPPM as the focus must be
supporting parents and carers to create safety for their children.  This requires periodic
review to ensure IRDs are operating effectively as they are resource intensive. There must be
clear understanding of the reasons IRDs are being held, for example, large numbers of IRDs
resulting in very small numbers of investigations present potential risks in responding to
children in greatest need of protection.
8 18 16 25
8 10
22 18 25
39
19 14
34
15
100
77
94 91
75 73
45
78 78 83
94
75
100 100
0
20
40
60
80
100
120
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Aug-
Oct
Nov-JanFeb-AprMay-Jul Aug-
Oct
Nov-JanFeb-AprMay-Jul Aug-
Oct
Nov-JanFeb-AprMay-Jul Aug-
Oct
Nov-Jan
2021/22 2022/23 2023/24 2024/2
Conversion Rate
% IRD to Initial and Pre-Birth CPPMs
% Initial and Pre-Birth CPPMs to Registration
644
referrals
40 IRDs
6 ICPPMs
The
conversion
rate from
referral to IRD
is 6.2%
The
conversion
rate from IRD
to ICPPM is
15%
Page 52

Page 53

APPENDIX 1
7 | P a g e
During CP Quarter 2, there were 19 Review Child Protection Planning Meetings (RCPPM)
held for 38 children, where their circumstances were reviewed with their families, lead
professionals and independent advocates, to assess if the identified risks had been
sufficiently reduced to consider removing the child’s name from the register.
As above, referrals from education colleagues have increased, prompting discussions to
better understand this trend. Collaboration with partner agencies is essential to ensure
timely and appropriate support is available. Early support aims to prevent unnecessary
escalation to the threshold for social work involvement and ensure referrals are directed to
the most suitable sources of support. 
Graph 7: Child Protection Registration Trends 
The trend is depicted across Graph 7 from 2021 - 2025 and shows in CP Quarter 2, that 19
children were de-registered and ten new children were registered.  This meant at the end of
CP Quarter 2, the number of children who were on the Child Protection Register (CPR) had
decreased by nine (from 69 to 60).
We have recently amended the process for decision making at Child Protection Planning
Meetings to enable the chairperson to exercise their independent status regarding the final
decision whether the child meets the criteria for registration or deregistration.
Regarding Graph 14, the aim is to support families make changes to safely parent their
children within a more focused time frame i.e. 12 months. If risks have not been significantly
5 10 15
21
6 8 9 14
25
34
16
9
22
10
31 35
44
50
42 37
27 32
50
79
70 66 69
60
9 6 6
15 14 13
20
9 9 5
25
13
19 19
0
10
20
30
40
50
60
70
80
90
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
Feb-
Apr
May-
Jul
Aug-
Oct
Nov-
Jan
2021/22 2022/23 2023/24 2024/2
CP Registration Trends
Number of Registrations Number on Register
Number of De-Registrations
Page 53

Page 54

APPENDIX 1
8 | P a g e
reduced, then alternative safeguarding measures should be considered. If risk has been
sufficiently reduced, and the child is experiencing safe and good enough care, then de-
registration should be considered, with the reasons understood and agreed by partners. 
Graph 8: Child Protection Registration Comparator Authority Trends (up to 31 July 2023)
Graph 9: Number of Child Protection Registrations Comparator Authority Trends (1 August
2022 to 31 July 2023) 
Chart 10: Number of Child Protection Deregistration Comparator Authority Trends (1
Page 54

Page 55

APPENDIX 1
9 | P a g e
August 2022 to 31 July 2023)
Pie chart 4: Registration reasons 
The reasons for new registrations often differ from the reasons for having an IRD. This is
because, throughout the information-sharing process and child in need assessment stages, a
more comprehensive understanding of the family's needs and a clearer perspective on risk
and safety emerges.
Regarding IRDs held for sexual abuse concerns, where the abuse is not within the family and
the family provides effective support and is deemed capable of safeguarding the young
person, registration is not required.
Graph 11: Registration Categories 
Graph 11 above shows the trend in registration categories across the reporting period (from
August 2023 to January 2025). 
2
1
1
3
5
8
CP Q2 - Reasons for New Registrations
Services find it hard to engage
Child Affected by Parent/Carer
Mental Ill-Health
Domestic Abuse
Parental Alcohol Use
Parental Drug Use
Emotional Abuse
Criminal Exploitation
Neglect
Other Concern
3
1
6
8
6
8
5
2 1
7
11
4 4
2 1
3
5
3 3 3
1
3
16
1 2
8
3 3
1
5 5 4
1
5
1 2
8 9
13
8
2
4
2 3 4
0
5
10
15
20
Q1 23-24 Q2 23-24 Q3 23-24 Q4 23-24 Q1 24-25 Q2 24-25
Registration Categories
Services find it hard to engage
Child Affected by Parent/Carer Mental Ill-Health
Child experiencing mental health problems
Domestic Abuse
Parental Alcohol Use
Parental Drug Use
Physical Abuse
Page 55

Page 56

APPENDIX 1
10 | P a g e
Graph 12: Family Groups 
As shown in Graph 12, at the end of CP Quarter 2, there were 15 family groups consisting of
one child, six family groups with two children and 12 family groups of three or more children
on the register.
Graph 13: Previous Registrations 
At the end of the CP Quarter 2, there were 22 children on the register who had one previous
registration and 15 with two or more previous registrations (as indicated in Graph 13).
Graph 14: Time on Moray CPR
I'm awaiting some more info to add to this section 
12
6
14
10
6
15
9
5
14
0 2 4 6 8 10 12 14 16
CPR Family Group: 3 or more children
CPR Family Group: 2 children
CPR Family Group: Single child
Family Groups on Moray CPR
Nov-24 Dec-24 Jan-25
15
24
22
25
27
22
8
10
7 8
14 15
0
5
10
15
20
25
30
Q1 Q2 Q3 Q4 Q1 Q2
Previous Registrations on Moray CPR
No. of children with 1 previous registration No. of children with more than 2 previous registration
Page 56

Page 57

APPENDIX 1
11 | P a g e
Graph 15: Age of children on the register 
Graph 15 shows the trend for 2023/25 against CP Quarter 2 data.  The consistently higher
prevalence in the last year, of children aged 5-10 years highlights the need for earlier
support and diversion services, ensuring this is provided at the earliest stages of a child’s
6
3
14
11
26
6
3
8
21
26
1
8
9
23
29
0 5 10 15 20 25 30 35
> 2 years
18 mths < 2
years
1 year < 18 mths
6 mths < 1 year
<6 months
Time on Moray CPR
Nov-24 Dec-24 Jan-25
1 1 1 1 1 1 1
4 4 3 1
12
15
18
25
29
37 36
26
22 22 21 22 20 21
17 18
19 19
16
20 20 22
25 26 24 26 26 26 24 24 25 25 25 26
23 23
9 10 11 13 15 15 15
18 18 18 19 19 19 16
20 20
17 15
1 1 1 1 1 1 1 1 1 2 3 2 2 2
0
5
10
15
20
25
30
35
40
Age Bands on Moray CPR
Unborn 0-4 5 - 10 11 - 15 16+
Page 57

Page 58

APPENDIX 1
12 | P a g e
development.  The number of young people aged 16 years old has remained static
throughout the Quarter. 
Page 58

Page 59

APPENDIX 1
13 | P a g e
THE FOLLOWING SECTIONS REPORT AGAINST THE FINANCIAL QUARTER (JAN - MAR 2025)
Graph 16: Number of children looked after away from home and at home 
Graph 16 identifies that at the end of Financial (Fin) Quarter 4, there were 171 children who
were looked after by Moray which is an overall reduction from 180 to 171 following an initial
increase. There is an increase in the number of newly accommodated children in 2024/25,
which is being analysed through the ‘Critical Mass’ work which will support a better
understanding of this data and identify mitigating actions.  
Since August 2023 the overall number of looked after children indicates a downward
trajectory. 
Pie chart 5: Care setting categories 
At the end of Fin Quarter 4, 48% of children were in family settings at home or in kinship
care with 52% in other settings such as foster care or residential homes. This has remained a
stable figure highlighting many looked after children have been able to remain within their
network of family and friends.  Alongside this, 86% of brothers and sisters remain together in
care which is above the national average of 79%. Brothers and sisters who are not together
are because of family circumstances or assessed needs.  The work of the Maintaining
176
178
185
187
183
180
182
172 172
177
179
175
173
175
177 176 175
180
178
171
160
165
170
175
180
185
190
No. of Looked After Children
55
11
5
17
43
32
1
6
1
Children in Care Settings
Foster Care
Residential in Moray
Short Breaks /Shared
Community Care
Out of Area
Kinship
At Home
Pros Adopters
New Scots
Secure
Page 59

Page 60

APPENDIX 1
14 | P a g e
Relationships Project is at an advanced stage, a key element of which is to sustain and
increase the percentage of brothers and sisters remaining together in care in line with the
Children’s Service Plan.
Foster care (55) and kinship care (43) are the highest categories followed by children looked
after at home (32).  The children’s houses (11) Cala, Rowan Lea and Land Street, continue to
operate at full capacity (14) where three young people are over 18, subject to Continuing
Care, and not recorded as looked after children. 
The number of young people in the Out of Area category (residential and foster care)
including Secure Care is 18. This external care is high cost where an updating report was
presented to the Moray Council’s Education, Children’s & Leisure Services Committee in May
2025 (Fin Quarter 1 for 2025/26). 
A significant majority of young people are in family-based care (137, 80%) rather than
residential care (34, 20%). The Carer Recruitment Campaign has seen new foster carers and
supported lodgings caregivers approved to support young people remaining in Moray in
family-based care settings. There remains the commitment to support young people in
family-based care settings. This includes supporting families to identify and promote kinship
care options via Family Group Decision Making processes.  
At the end of Fin Quarter 4, 16.9% of our looked after children were cared for on a full-time
basis in residential care.  If short breaks are included the figure of young people in
residential care increases to 19.8%.  The indicator (to be kept within or lower) is adjusted
annually to the average of comparator authorities (17.5%, 2022/23).  
As such, Moray is 0.6% below the average indicator when considering full-time care on its
own and 2.3% above if short breaks are included. This highlights that the priority for Moray
is to support young people in family-based care, where possible, to provide a positive model
of family life.
The average of comparator authorities' data is based on 2022/23. More up to date
comparator data is awaited although the timescales for this has not yet been clarified.      
One young person was remanded in secure care from November 2023 at the direction of the
Court.  This aligns with the recent changes in Justice legislation for children under 18 where
they are remanded into the care of local authorities rather than Young Offenders
Institutions.
Moray hosts a group of six young people who are New Scots (formerly Unaccompanied
Asylum-Seeking Children) via the National Transfer Scheme.  These children and young
people are allocated to the Throughcare and Aftercare Team by the Home Office and are
counted as looked after children to ensure they receive full support.  Initially, these young
people are in Supported Lodgings or Supported Accommodation care settings.  The team
continues to successfully support them to move into their own independent housing once
they have been granted asylum. 
The number of new arrivals of New Scots in Fin Quarter 4 was zero which was the same
figure for Fin Quarter 3. COSLA and the Home Office cannot yet determine the reason for
this reduction and whether it is a short- or long-term trend. The resource allocation system
in Moray means there are the resources to support New Scots including any future increases
in numbers.        
Page 60

Page 61

APPENDIX 1
15 | P a g e
Graph 17: Moray foster care households 
At end of Fin Quarter 4 there were 55 children living in foster care, with 51 (92.7%) children
living with Moray Council foster carers and 4 (7.2%) living with independent foster carers.
This identifies that, despite the challenges in recruiting carers both locally and nationally,
Moray has ensured that most children are living with in-house foster carers.         
Of our 36 fostering households, 83.3% are actively caring for a child.  Not all fostering
households have children living in their care.  At the end of Fin Quarter 4 this comprises 6
(16.6%) in total.  This is a small number due to family circumstances or matching
considerations of their registration approval where foster carers are inactive for a short
period of time.
The Fostering Team is working to broaden the approvals capacity of Moray foster carers,
with additional support and advice, to enable care for a wider group of children and
maximise capacity.  
Graph 18: Children who live in foster care   
35 36 37 37 36 35 36 36
27 27 25 25 28 31 31 30
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
0
5
10
15
20
25
30
35
40
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2023/24 2024/25
Moray Foster Carers
No. of Moray Council Fostering Households
No. of Moray Council Foster Carers with 'Active' placements
% of Foster Households who are 'active'
44 43 45 47 45 48 46 45 47 46 51 51 50 48 47 47 47 52 53 51
11 11 7 7 7 7 7 6 6 6
6 6 6 6 6 6 5
5 5 4
0
10
20
30
40
50
60
70
Children in Foster Care
Local Authority Foster Care Foster with other orgs paid for by Local Authority
Page 61

Page 62

APPENDIX 1
16 | P a g e
Graph 18 identifies that at the end of Fin Quarter 4, there were 51 children cared for by
Moray foster carers, which is an increase from Fin Quarter 1 in 2024 which was 45. 
However, this includes some quarterly fluctuations where the pattern is relatively stable.  
The number of approved Moray foster carer households for children has remained stable. 
Although the carer recruitment campaign is resulting in new fostering households, this is
balanced by other foster households ceasing or changing the type of fostering they provide.
The challenge in recruiting and retaining foster carers is both a local and national issue.  The
recruitment campaign is significant in recruiting foster carers accompanied by work to
achieve greater retention rates, focused on supporting foster carers with improved
supervision, training and finances.
Foster carers are graded by the level of skills learned and developed, ranging from Level 1 to
Level 4 being the highest, which is under review to simplify the model and have a higher
starting financial rate which should support recruitment.   
Young Carers work is reported to other Integration Joint Board Committees which is being
reviewed with a view to inclusion in this report.          
Graph 19: Kinship care settings
Kinship care is split into two groups: pre-approved kinship homes awaiting presentation at
the Kinship Panel for approval and kinship households already approved at Panel.  Moray is
seeking to increase the numbers of kinship households. This is to ensure more children and
young people can remain within their own communities and network of family and friends. 
It is envisaged that the numbers of kinship households will increase via the use of, for
example, Family Group Decision Making processes. 
The Kinship Care Policy is under review including streamlining the assessment and decision-
making processes and reviewing financial support which should support an increase in the
number of kinship carers.            
30 32 29 31 32 30 29 30 31 29 29 29 29 28 30 28 25 26 26 25
30 29 26 26 32 34 32 31 30 32 33 32 32 31 33 31 32 32 32 31
10 14
14 16 11 7 9 10 12 9 7 8 8 8 9 9 5 5 5 5
0
10
20
30
40
50
60
70
80
Kinship Care Settings
Kinship: No. of Children in Pre-Approved Placements Kinship: No. of Children in Approved Placements
Kinship: No. of households providing Kinship Placements
Page 62

Page 63

APPENDIX 1
17 | P a g e
Graph 20: Residential care 
Residential care is divided into those in residential care in Moray and those out with Moray. 
Children cared for in Moray live in the authority's own children’s houses, Cala and Action for
Children’s two houses in Buckie and Elgin.  The figure for this category is 11. As above, the
children’s houses operate at capacity (14) including three young people in Continuing Care.
Out of Area care tends to be specialist residential houses or residential schools.  There has
been a consistent focus on providing this care in Moray where possible, so children remain
close to their families and support network.  The figure for this category is 17. 
Work is underway to reduce the number of young people in Out of Area care which is
expensive and does not geographically support young people in maintaining relationship in
Moray including health, education, family and friends.
Residential care settings can be the correct care setting for some children and young people,
often due to previous unsuccessful multiple family care arrangements. However, in most
cases, a family-based setting is preferrable as it better prepares young people for adulthood
as they have a positive model of family life. For those young people in residential care, there
is significant preparation via independent living skills to support them in the transition to
adulthood.      
Graph 21: Through Care, After Care and Continuing Care data 
13 14 14 14 13 12 13 12 12 13 13 12 11 10 12 12 11 10 12 11
11 11 11 11 11 11 11 10 10 11 11
9 9 11
12 12 12 14
14 17
0
5
10
15
20
25
30
Residential Care Settings
Residential Care in Moray Residential Schools or Out of Area Placements
45 43 40
19 20 19
8 9 11
0
10
20
30
40
50
Jan-25 Feb-25 Mar-25
Through Care, After Care and Continuing Care
TCAC: Open as Through Care TCAC: Open as Aftercare TCAC: Open as Continuing Care
Page 63

Page 64

APPENDIX 1
18 | P a g e
As illustrated in Graph 21, as at 31 March 2025, there were 70 young people receiving care
from the Through Care After Care (TCAC) Team including eleven receiving Continuing care
support. It is anticipated that the numbers of young people subject to Continuing Care will
increase as this approach becomes more embedded in Moray.
The team is divided into three sections: 
• Through Care: Young people receiving support to plan and prepare for
independence.
• After Care: Young people who have left care but are receiving continuing support. 
• Continuing Care: Young people who choose to remain where they live beyond their
18th birthday until they are 21 although it can be in place from 16.  These young
people cease to be formally looked after by Moray Council but are legally entitled to
continue living where they are. This provides stability in a familiar and nurturing
setting. There is a focus on continuing care to ensure young people in different care
settings are given the opportunity to remain where they are living potentially until
the age of 21.  This is a key responsibility for the organisation and partners as
corporate parents.   
The team is responsible for supporting New Scots (formerly Unaccompanied Asylum Seeking
Children) via the National Transfer Scheme.  This is an increasing workload for the team,
which is dependent, in part, on the numbers of young people arriving in Kent, making future
forecasting a significant challenge.      
The team offers considerable support to young people after they leave care (After Care) up
to the age of 26. There is a commitment to offer the same support birth families provide for
young people who are transitioning into adulthood. This is a key element of Moray Council’s
and Health and Social Care Moray’s responsibilities as Corporate Parents.   
Other reporting areas being considered are positive destinations: work, education, training,
and accommodation, and outcomes for New Scots. 
Justice and Youth Justice. 
Graph 22: Care experienced young people supported by Justice Services 
435 424 421 424 403 415 422 450 440 449 443 466 472 478 477 492 490 497 496
44 42 42 44 42 43 39 37 35 31 34 34 36 40 40 44 46 48 43
0
1
2
3
4
5
6
7
8
9
10
0
100
200
300
400
500
600
Care Experienced People in the Justice System
Open to Justice Team Open to Youth Justice %  CEYP open to both MYJ and JS
Page 64

Page 65

APPENDIX 1
19 | P a g e
Nationally, care experienced young people (CEYP) are overrepresented in the Scottish Justice
Systems.  At the end of Fin Quarter 4, 8.5% (46 of 539) were CEYP (up to age 26) in the
Justice System (Youth Justice 15, Justice Social Work 31) as depicted in graph 22.  
This figure has consistently remained below 12% throughout 2023/24.  Work continues to
identify CEYP and offer early assistance and support where possible.  The aim is to address
identified needs and risks to reduce re-offending rates and maximise support, including
existing relationships, to reduce the length of time they are supported by justice services.
Research informs that early entry or prolonged exposure to the criminal justice system can
draw children into the system rather than rehabilitate and divert from the system.  Children
who are remanded or sentenced to custodial sentences in a secure care facility are included
within the numbers above.
Graph 23: Ages of children in Youth Justice 
The average age of a children receiving Youth Justice services is 15 years old which has
remained consistent throughout this year.  Most work is with children aged 11 to 15 years
including supporting them to maintain or re-engage with education and meeting their
identified needs.
Whilst the team works with all schools throughout Moray, it has strong links with Moray
Social, Emotion and Behavioural Needs Service (SEBN) where support is offered for social,
emotional and behavioural needs.  There is a small number of young people aged over 18
years in the Youth Justice Service, which continues where the team has the most meaningful
relationship with them.  Planned transitions and joint working between Youth Justice and
Justice Social Work minimises the impact on the young person. 
33 29 31 30 24 22 22 27 21 22 21 21 21 21 21 25 28 26 27 24
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
14 15 14 15
15 14 15
14
13 16 13 15 10 7 7 8 9 15
18
16
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 0 0 0
1 1 1
3
4 2 2 1
0 1 0
3 3 3
3
2
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
49
44 46 46
41 38 39
45
38 40 36 37
32 30
35 36 40 44
50
43
0
10
20
30
40
50
60
Age Bands - Youth Justice
YJ: Age Band: 5-10 YJ: Age Band: 11-15
YJ: Age Band: 16-17 YJ: Age Band: 18+
YJ: No. open to Youth Justice
Page 65

Page 66

APPENDIX 1
20 | P a g e
Pie chart 6: Gender of individuals in Youth Justice   
Pie chart 7: Gender of individuals in Justice Services
At the end of Fin Quarter 4, most individuals supported by Youth Justice were males
accounting for 83.7% of children and young people supported by the service.  
In Justice Social Work 13.4% of individuals supported by the service were females, which has
remained relatively static over the past year.  It is recognised women in the justice process
are more likely to have experienced trauma and are also more likely to be a sole carer for a
child or family member.  
In line with The Promise, Justice Social Work is committed to keeping women in their local
communities where it is safe to do so and provide robust alternatives to custodial sentences. 
Currently the team offers a gender responsive service which includes a weekly women’s
group and a woman only unpaid work group.  Support is offered in partnership with other
services to promote opportunities for individuals to engage with community resources which
will be available beyond their time within the justice service.   Work continues to capture the
views of individuals to evaluate the impact of this service and shape its development. 
Evaluation from the Area Public Health Co-ordinator, following delivery of wellbeing
sessions, highlighted positive feedback from attendees.                                               
36
7
Gender: Youth Justice
YJ Gender: Male YJ Gender: Female
431
67
Gender: Justice
Service
Justice: Male Justice: Female
Page 66

Page 67

APPENDIX 1
21 | P a g e
Graph 24: Justice social work reports (JSWR) 
Justice Social Work reports (JSWR) remain a priority to reduce any delays in sentencing and
for Fin Quarter 4 the target of 100% on time has been met.  Whilst reports are prepared at
the request of any Court for an individual living in Moray, most reports are submitted to
Elgin Sheriff Court.  There has been in an increase in report requests received over Fin
Quarter 4 due to an increase in Court business during this time.
Completion of Court reports on time results in appropriate sentencing for individuals which
addresses their current assessed risks and needs, and reduces time spent on remand where
a community sentence is imposed.  It also importantly supports a timely outcome for victims
of offences.
Pie chart 8: Justice Report Types 
In addition to a standard JSWR report the Court may request additional assessments such as
a Drug Treatment and Testing Order (DTTO) assessment and a Restriction of Liberty Order
(ROLO) assessment as shown in pie chart 8.  The imposition of a ROLO or DTTO can be a
direct alternative to custody so effective assessments for these Orders can offer a robust
community-based disposal.  
104 104 106 103
130
107 107
138
96 96 90 94
121
95 95
121 100 100 100 100 100 100 100 100
0
20
40
60
80
100
120
0
20
40
60
80
100
120
140
160
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2023-24 2024-25
Justice - SW Reports submitted on time
No. Social Enquiry Reports submitted on Time No. of People % of Reports on time
[VALUE],
[PERCENTAG
E]
58, 42%
76, 55%
[VALUE],
[PERCENTAG
E]
Types of Report
JSWR DTTO
Assessment
JSWR ROLO
Assessment
JSWR Standard
JSWR Unpaid
Work/DTTO/ROLO
Assessment
Page 67

Page 68

APPENDIX 1
22 | P a g e
There has been an increase in the request for ROLO assessments during Fin Quarter 4.  A
ROLO is where an electronic tag is used to restrict an individual's movements, either to
remain in a certain place within time frames or restrict from certain areas.  This can be
imposed as part of an Order supervised by a Social Worker or as a standalone disposal. 
Graph 25: Structured deferred sentences (SDS) 
An SDS is a flexible provision with structured social work support for an individual after
conviction but prior to sentencing.  Successful completion of an SDS reduces the need for a
statutory Court Order, in turn reducing the overall length of time an individual is supported
by the service.  The number of in SDS disposals in Fin Quarter 4 has risen slightly but remain
lower than in the previous year likely due to increases in other early intervention measures. 
Graph 26: Bail supervision 
Bail supervision is an alternative to remand and the priority for this in Moray is women,
young people, those with caring or parental responsibilities and those with issues relating to
mental health or addictions.  Assessments are undertaken for all people where bail is being
opposed by the Procurator Fiscal and are provided on the same day.  There is a small
reduction in the number of assessments requested in Fin Quarter 4 and a slight decrease in
9 11 9
20 16 18 21 17 21
8 10 11
9 9 9
20
15
17
20
17
21
6
10 11
0
5
10
15
20
25
30
35
40
45
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2022-23 2023-24 2024-25
Structured Deferred Sentences
No. of Structured Deferred Sentences imposed No. of Individuals with SDS imposed
1
2 4 4
17
33 34 38
59 62 50 47 1 0
3 4 5
2
7
15
14 13
17 12
1 0 3
4
5 2
7 15
14 12 17
2
0
10
20
30
40
50
60
70
80
90
100
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2022-23 2022-23 2022-23 2022-23 2023-24 2023-24 2023-24 2023-24 2024-25 2024-25 2024-25 2024-25
Bail Supervision
No. of requests from Court for Bail Supervision No. of Bail Supervision cases commenced
No. of individuals commenced with Bail Supervision
Page 68

Page 69

APPENDIX 1
23 | P a g e
bail supervision orders imposed.  There continues to be a significant number of assessments
which do not result in bail being opposed and work is being undertaken nationally to
understand trends, but data is not yet available to compare.  The prison population in
Scotland remains high, and bail supervision is one area of work which is hoped will assist in
reducing these numbers whilst offering more positive outcomes for individuals within their
local communities.
Graph 27: CPO with supervision requirement 
Fin Quarter 4 has again seen a slight reduction in the imposition of Community Payback
Orders (CPO).  Most individuals made subject to a CPO are seen on the day of sentencing, for
those where this has not been possible, an appointment with their allocated social worker is
made within seven days of an Order being imposed.  There is a reduction in the target met
during this Quarter which is related to individuals not attending appointments for a variety
of reasons, staff sickness and public holidays.  Additional training is scheduled to ensure new
and existing staff are entering this data correctly, for accuracy. 
Diversion from Prosecution
Diversion from Prosecution (DfP) allows someone accused of offences to be dealt with
outside of the formal justice system. Successful completion of a diversion from prosecution
means an individual will not have a conviction for the alleged offence which may impact their
current or future employment or education alongside other significant areas of their life.  
The Justice Social Work team undertakes all assessments of suitability; however, the Youth
Justice team aids and supports young people aged 16 and 17.  The referral rate varies which
is a result of the process of cases being marked by the Procurator Fiscal.  There can
occasionally be delays in the commencement of these cases where additional agreement is
required from the Procurator Fiscal, e.g. an extended period for completion.  In comparison
to Fin Quarter 4 last year there is a small increase in assessments completed for males and a
small decrease in assessments completed for females.  
Outcomes Star data indicates most individuals feel an improvement in their wellbeing at the
end of a DfP.  Information contained within exit questionnaires include:
0
20
40
60
80
100
120
0
10
20
30
40
50
60
70
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
2023-24 2023-24 2023-24 2023-24 2024-25 2024-25 2024-25 2024-25
CPOs with Supervision
No. of new CPOs with Sup Req No. seen by Supervisor within 7 days % Target Met
Page 69

Page 70

APPENDIX 1
24 | P a g e
Work is being undertaken to improve the recording and examination of this data and
feedback.
Finalised updated guidance for DfP is awaited from the Scottish Government, however there
are plans from Community Justice Scotland to provide training to all staff which it is
anticipated will improve local and national practice.
Graph 28: Diversion from prosecution: Female 
Graph 29: Diversion from prosecution: Male 
6
5
8
5
2
1
3
4
1
0 0
4
0
1
2
1
0 0
2
1 1
2
3
8
2 2
5
2
3 3
1 1
0 0
4 4
0
1
5
0 1
2
3
8
2 2
5
2
1
2
1
0 0 0
2
4
0 0
5
0 0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
Diversion from Prosecution: Female
DFP Gender: Female DFP Commencing Gender: Female DFP Completed Gender: Female
6
12
9
3
7 6 7
12 12
4 5
8
1
5 6
3 2 1
7
4 5
3 4
9
2
7
3 4
7
5
2
4
8
11
4
6
2
8
3
5
0
2
4
6
8
10
12
14
Diverson from Prosecution: Male
DFP Gender: Male DFP Commencing Gender: Male DFP Completed Gender: Male
Page 70

Page 71

APPENDIX 1
25 | P a g e
Policy, development, trauma-informed and commissioning. 
Procedure for the Supported Lodgings Project 
Supported lodging care is intended to provide young people with a gradual step between
independent living and leaving their home environment, often arranged by the local
authority (including fostering, residential setting, kinship, or continuing care). It offers a
warm, welcoming and supportive environment which
provides a young person opportunities to develop their
independent living skills and a stepping stone towards
independence. 
This Procedure has been developed to support the work of
social workers with responsibilities around Supported
Lodgings Service, which is a registered service subject to
inspection by the Care Inspectorate. It outlines tasks and
practice expectations for social workers, aiming to facilitate
consistent service provision and seamless experience for
young people and carers. 
The procedure is planned to be launched in June 2025. 
Trauma-Informed Practice
In Moray, as part of the work towards the Scottish Government’s vision of trauma-informed
and response workforce within public bodies, the Trauma Informed Development Officer has
been leading on the assessment of services in terms of the principles of trauma-informed
practice (Safety, Trust, Choice, Collaboration, and Empowerment), identification of areas of
change and supporting future developments. 
A three-pronged approach is applied. The first prong, focusing on awareness-raising, consists
of an Introduction Brief highlighting the Scottish Government’s vision at strategic and
operational levels within the Service. The second prong, called a Walk Through Lens of teams
and services, consists of an interactive session conducted to identify what is working well
and what may need to be addressed to become trauma informed. The third prong consists of
the development of action plan owned by the teams providing the service, which begun to
be generated at the end of Fin Quarter 4. 
The Development Officer is supporting a total of 47 teams at present, and this number is
anticipated to grow as teams from various parts of Health and Social Care Moray start their
trauma informed journey. The currently supported teams are placed across Social Work,
Justice Services, Drug and Alcohol Services, Health, Education, Housing and 3rd Sector
partners. The line charts below indicate the progress of the work in this area as of the end of
Fin Quarter 4. 
Page 71

Page 72

APPENDIX 1
26 | P a g e
Graph 30: Number of delivered sessions 
Alongside the delivery of these sessions, the Development Officer is leading on the review of
available training on trauma-informed practice for staff across Moray Council and Health and
Social Care Moray. Agreement has been provided by NHS Education for Scotland for training
to be embedded within the Moray online CLIVE learning management system. Once Legal
Services have reviewed the licence agreement, the programmes will be available for
embedding within CLIVE and promotional information will be released across the
partnership. 
Children’s Social Work Development Plan 
A Children’s Social Work Development Plan was created following two development days in
November 2025, where five key social work practice themes identified from a review of
complaints were explored. 
The Plan, inclusive of arrangements for monitoring and evaluation, has been launched with
warm reception. The tasks of the Plan fall into the following areas:
- The voice of children and young people: toolkit and guidance for practitioners 
- Engagement with people who receive services: leaflets 
- Engagement with staff: consultation, newsletter, refresh of induction processes
- Training: chronologies, assessment, analysis, permanence, child protection, trauma-
informed practice, contextual safeguarding. 
- Newly Qualified Social Workers & Social Workers in Training: support for those in
training and the trainers
- Streamlining paperwork: core assessment, referral forms, and so on.
- Policies and procedures: develop and update policies and procedures
- Quality Assurance: self-evaluation within the service and with partners. 
The Plan will be reviewed, updated and shared widely on a quarterly basis.  
7
18
28
32
36 37
41
1 2 4 6
11 12 13
0 0 0 0 0 0 2
0
5
10
15
20
25
30
35
40
45
Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25
Number of delivered sessions
Introduction Brief Walk Through Lens Action Plan
Page 72

Page 73

APPENDIX 1
27 | P a g e
Newly Qualified Social Workers Conference
A group of five local authorities formed the
North Partnership to support newly qualified
social workers in their final year or at the
beginning of their career by facilitating an in-
person conference focusing on the theme:
‘How to Survive in Social Work’. 
The conference, planned for 24 April 2025 and starring Dr Neil Thompson (author, educator
and adviser in social work practice) consists of five workshops: 
 Trauma Informed Practice 
 UNCRC and Rights Based Practice 
 Support and Supervision 
 Professional Identity 
 Professional Curiosity.   
There are plans in place to gather participant feedback following the event; this will be
covered in the Fin Quarter 1 (Apr - Jun 2025) report. 
Children and Families and Justice Social Work Commissioning 
The Commissioning team within Children and Families and Justice Social Work leads on
seven key areas of service contracts. The pie chart below indicates the percentage of each
area from the total spend for Fin Quarter 4. 
Pie chart 9: Areas of service contracts spend 
The individual contracted service areas will be discussed next in turns. 
Page 73

Page 74

APPENDIX 1
28 | P a g e
Family support services
The family support services area, accounting for 12% of the spend, consists of:
1. the independent advocacy service 
2. three services for prevention and early intervention in order to avoid family
breakdown and possible out of area care arrangements: 
2.1. Families Together
2.2. Functional Family Therapy 
2.3. Aberlour Youth Point Moray. 
1. Independent advocacy
Moray’s Children’s Right Service, delivered by Quarriers, is available to all young people and
their parents, carers and siblings. In this quarter, 194 young people and 152 parents, carers
and siblings benefitted from the service.  This is an increase compared to previous quarters,
as shown on the figure below. 
This quarter saw 56 new referrals into this service, 24 for children and young people and 32
for parents, carers and siblings. 
Graph 31: Independent advocacy caseloads 
Pie chart 10: Categories of advocacy support
provided
In this quarter, the advocacy service was
provided to young people who are looked after
(83), are in need of protection (30) and need
multiagency support (81). The figure on the left
depicts this. 
The support provided includes the attending of
meetings with the young people and adults. In Page 74

Page 75

APPENDIX 1
29 | P a g e
“Young Person Worker
has worked their magic”
Parent, 27/02/25
this quarter, Quarriers staff have attended 285 in-person professional meetings: 
- 148 for children & young people
- 137 for parents, carers & siblings.   
Quarriers are currently operating with a small waiting or pending service list; as at 31 March
2025 there were four referrals on it. Referrals on the waiting list are triaged with a view to
prioritise service provision for looked after children and children requiring protection. 
The issue of capacity is hoped to be fully mitigated in the next quarter, due to the successful
recruitment of staff increasing capacity. 
2. Prevention and early intervention services
The three prevention and early intervention services (Aberlour Youth Point, Families
Together and Functional Family Therapy) supported a total of 133 children and young people
and their families in this quarter. This is an increase compared to the previous quarter, as
illustrated on the figure below.
Graph 32: Early intervention services
Despite the increase, these services have capacity for new referrals; this has been
communicated across the Social Work teams.
2.1. Aberlour Youth Point Moray
Aberlour Youth Point Moray supports children and young
people who struggle to remain positively engaged within
their home, school or community and who require a
targeted support service.  It also provides support to the
parents or carers of the children and young people with
whom they work.
15
54
39
18
72
43
0
10
20
30
40
50
60
70
80
Functional Family Therapy Families Together Aberlour Youth Point
Q4 Q3
Page 75

Page 76

APPENDIX 1
30 | P a g e
“Many thanks for the wealth
of information”-Parent Carer,
March 2025
The results from the Fin Quarter 3 survey completed by the young people and their families
who access the service were mainly positive. 
2.2. Families Together 
This service delivers a restorative family service in a variety of ways, including a range of one
to one and group sessions, family focussed money advice service, practical support (e.g.,
food parcels and school bank referrals) and the
Family Group Decision Making approach.
The service has reported the provision of the
following supports in Fin Quarter 4:
• financial gains: 13 families
were supported with welfare rights and 12
families were supported by the distribution of
nine fuel bank vouchers, one supermarket
voucher, two food bank referrals and purchased
two SIM cards. 
• Debt managed: families supported with energy advice. 
The Family Group Decision Making (FGDM) process
brings together a child or young person’s extended
family and friends, providing a blame-free and future-
focussed space to discuss the strengths and the
difficulties the family faces. The main aim of this
approach is to repair relationships and improve the
child or young person’s support network. Children First
are currently working with 8 families through FGDM
with positive feedback, as exemplified by the quote to the right.
2.3. Functional Family Therapy 
Functional Family Therapy is a short term,
strengths and family-based therapy
programme designed to help families improve
communication and relationships with a view
to keep them together. 
Currently, 11 families are supported by this
service.  The quotation on the left
demonstrates the changes one family faced in
the service. 
Support for Unpaid Carers
This service, delivered by Quarriers, accounting for 4%
of the total spend in Fin Quarter 4 and is inclusive of the
“Our therapist has been amazing
at identifying our son’s triggers
and patterns of behaviour and
giving the family support and
strategies to try to de-escalate
and manage behaviours” – Parent
17/02/25
“Was good to talk to
someone, thank you” –
Young Person, 10/02/25
Page 76

Page 77

APPENDIX 1
31 | P a g e
“I am always seeing my son
with a smile on his face and
hearing his contented noises,
he holds my hand which tells
me he is happy in Scotia”-
Parent, 31/01/25
“You are all a great bunch of
staff, and I do like living here.  I
know you look after me really
well and you do love me”-
Young Person in Residential Home
provision of our statutory requirements under The Carers (Scotland) Act 2016.
Currently, 1188 adult and 198 young carers (the highest this has ever been) benefit from this
service with positive feedback, as exemplified by the quote to the right. 
As noted in the Fin Quarter 3 report, this contract has changed in terms of the responsibility
of the completion of the Adult Carer Support Plan and Young Carer Statement. This moved
from Quarriers to Health and Social Care Moray. Support and transition work will follow to
ensure that there is no gap in the service delivery during the period of change. 
Out of area care via Scotland Excel of local frameworks 
Accounting 51% of the total spend, out of area care is provided to 23 young people; this is an
increase of two young people since Fin Quarter 3. 
Out of area care is provided to:
- 19 children in residential care under Scotland Excel Frameworks and Local
Authority Framework (49% of spend)
- 4 children in foster care under Scotland Excel Frameworks (2% of spend).
Local Residential Care
Accounting for 15% of the spend, residential care is provided
to eight young people by Action for Children across two
homes in Moray. The number of children benefiting from
this service has not changed since the previous reporting
period. 
The quote on the right is provided by one of the young
people living and settled in one of the two homes. 
Children with a Disability – Residential services 
The Scotia residential service, accounting for 13%
of the spend, is delivered by Aberlour Childcare
Trust in Alba Place, Elgin. Currently, a small
number of young people benefit from this service. 
Monitoring arrangements indicate that these
children are fully supported, maintaining
relationships with family and friends, and enjoy a
wide range of inclusive community activities.
The quote from a parent on the right exemplifies
the positive impact of the service. 
Children with a disability- support
Commissioned services supporting children and young people with disabilities account for
4% of the total spend and consist of a short break and group activities services.  Page 77

Page 78

APPENDIX 1
32 | P a g e
“I am enjoying having time to
myself I am making use of the
time by spending quality time
with friends” 
Parent, 10/01/25 
Short Breaks Services
This contract commenced 1 September 2024 and
provides day care and overnight short breaks for 12
young people.  They deliver 15-day care and (on
average) 21 overnight sessions per month. This
allows a break for the family, the benefits of which
is deemed positive, as demonstrated by the quote
on the right.
Group Activities
This is new service co-commissioned with children, young people and their families, which
was launched towards the end of the reporting period. There have been nine referrals into
the service with the group sessions starting during the school Easter holidays.
More information will be reported in the Fin Quarter 1 (Apr - Jun 2025) report. 
Contextual safeguarding
In Moray, like other areas in Scotland, an increasing number of young people appear to be at
risk of or posing harm in the community. Contextual safeguarding is a novel approach to
understanding and responding to children's experiences of significant harm beyond their
family and home; it offers a way to understand these risks, engage with children and young
people and help to keep them safe.
As this is a new area of work, initial efforts are focussed on awareness raising. The
Contextual Safeguarding Working Group, under the banner of the multiagency Child
Protection Implementation Group, has organised a series of sessions for professionals and
practitioners. These sessions aim to enhance partnership staff’s comprehension of key roles
in safeguarding children and young people where risks are evident outside their family
homes. Pre- and post-session surveys are planned to measure the impact of the awareness-
raising effort, which can be fed back to the MIJB within upcoming performance reports. 
In addition to this, a pilot framework aiming to enable partner agencies to understand and
respond to contextual risks around groups of children who may or may not be supported by
services on an individual basis. The pilot framework consisted of three meetings focusing on
the sharing of relevant information with a view to identify common contextual factors (e.g.,
spaces, adults, etc) that influence behaviour or pose risk, and to build or mitigate these
within individual support plans. The common contextual factors are also shared with senior
members of staff to inform service delivery within the communities. 
The feedback from this pilot has been positive from attendees and we hope to embed the
approach in the future.
Page 78

Page 79

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 19 JUNE 2025 
SUBJECT: INTERNAL AUDIT SECTION - UPDATE REPORT 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 This report provides Committee with an update on the work of the Internal
Audit Section. 
2. RECOMMENDATION 
2.1 Committee is asked to consider the contents of the report, seek
clarification on any points noted and otherwise note this audit update. 
3.  BACKGROUND 
3.1 Public Sector Internal Audit Standards (PSIAS) require the Chief Internal
Auditor to prepare and present reports to committee on internal audit’s activity
relative to the audit plan and on any other relevant matters. 
4.  KEY MATTERS RELEVANT TO RECOMMENDATION 
Ways of Working Protocol- NHS Grampian & Integration Joint Board
Internal Audit
4.1 As the Chief Internal Auditor, I provide assurance on the internal controls of
systems and practices required by the MIJB to deliver services, whether
through Council or NHS systems. As previously detailed, an agreement has
been reached with the management of NHS Grampian and their Internal
Audit Provider to receive and report reviews of NHS systems and practices
relevant to this Committee.  This will complement the reports already
provided on Moray Council owned systems, given my role as the Council’s
Auditor. 
4.2 I am pleased to report that this collaborative arrangement has been further
strengthened by the agreement of a 'Ways of Working Protocol' between the
internal audit services of NHS Grampian and the Moray, Aberdeenshire, and
Aberdeen City Integration Joint Boards (see Appendix 1). This agreement
Item 7.
Page 79

Page 80

aims to enhance governance and improve the control environment across all
organisations by supporting more comprehensive and overarching reviews. 
Follow Up Reviews 
4.3 Internal audit reports are regularly presented to members, detailing not only
findings but also management's responses to the recommendations with
agreed dates of implementation. Internal Audit will also undertake follow up
reviews to evidence the effective implementation of these recommendations.
Please see detailed the following completed follow up review: 
4.4     Self Directed Support – Option 1
The Social Care (Self-Directed Support) (Scotland) Act 2013 came into effect
in April 2014, introducing the term 'Self-Directed Support' (SDS) to describe
how individuals can exercise choice and control over the support or services
that enable them to live independently and achieve agreed outcomes. This
follow-up review examined the implementation of recommendations from an
audit of Self-Directed Support (SDS) Option 1. SDS Option 1 involves
providing a direct payment to a supported person for the provision of support.
The audit assessed the effectiveness of procedures for monitoring funds
issued to individuals, including randomly selecting a sample of care packages
to verify compliance with operating procedures. It also ensured that
expenditures aligned with agreed budgets and support plans, and confirmed
that surplus funds were recovered where appropriate. 
4.5 The follow-up review found that significant progress has been made in
implementing the audit recommendations. However, while workload and
staffing concerns are acknowledged, several recommendations remain only
partially implemented. This is the third follow-up review conducted by the
Internal Audit Section for this audit. The Service has indicated that all
recommendations should be fully implemented during 2025/26. It is proposed
that no further follow-up review be undertaken; however, an audit of Self-
Directed Support for direct payments will be included in a future Internal Audit
Plan. The Follow-Up Report reviewing the implementation of the agreed
recommendations is provided in Appendix 2. 
Self-Directed Support (SDS) – Option 2/3
4.6 This follow-up audit checked the implementation of recommendations related
to the systems and procedures for administering SDS Options 2 and 3. SDS
Option 2—Managed Budget, allows individuals, following a care assessment,
to choose their own support while Health & Social Care Moray arranges its
provision and payment. SDS Option 3—Managed Support, is where Health &
Social Care Moray selects, commissions, and pays for appropriate support on
behalf of the individual. The audit reviewed processes for assisting individuals
in determining their preferred care delivery options, managing contractual
relationships with care providers, overseeing financial management and
monitoring individual care packages. The Follow-Up Report, provided in
Appendix 3, highlights several recommendations that have not yet been
implemented. The Service has set revised implementation dates for the
outstanding recommendations and will review progress at monthly SDS
Steering Group meetings, with updates also reported for monitoring at monthly
Practice Governance Board meetings. 
Page 80

Page 81

Moray Integrated Community Equipment Store
4.7 An audit was previously undertaken on the Moray Integrated Community
Equipment Store, which provides aids and equipment to assist individuals with
daily tasks such as cooking, dressing, and bathing. Stock items vary in value,
ranging from a few pounds to over £1,000 for certain hoists and specialised
seating. A key feature of the Store is its handling of returned equipment that is
no longer required. Where possible, returned items are decontaminated and
made available for reuse. The audit identified significant areas requiring
improvement in the Store’s current operating arrangements. A recent follow-up
review found progress in implementing the recommendations; however,
several remain outstanding and require revised implementation dates. The
Follow-Up Report, which evaluates the implementation of the agreed
recommendations, is provided in Appendix 4.
.
5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Moray
Partners in Care 2022-2032” 
Internal audit work supports good governance and assists in securing
appropriate  systems of internal control. 
(b)  Policy and Legal
The internal audit service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d)  Risk Implications
Audit reports highlight risk implications and contain recommendations for
management to address as a means of mitigating.   
(e) Staffing Implications
No implications directly arising from this report 
(f)   Property
No implications. 
(g)  Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions 
None arising directly from this report. 
(j)   Consultations
There have been no direct consultations during the preparation of this       
report.     
Page 81

Page 82

6. CONCLUSION 
6.1 This report provides Committee with an update on internal audit work
progressed in the latest review period. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/
Page 82

Page 83

Aberdeenshire
Health & Socia! Care
Partnership
Aberdeen City Health & Social Care Partnership
A., • ''" ' • • ..,,
Ways of Working Protocol
NHS Grampian and Integration Joint Boards Internal Audit
NHS
�
Grampian
The following sets out the protocol to be followed with regards to assurance activities
across NHS Grampian and the Moray, Aberdeenshire and Aberdeen City fntegration
Joint Boards. This work will be led by the respective Chief Internal Auditors (CIAs) and
focus on the following:
• The Internal Audit function of the Partner bodies will be included as formal
consultees in the annual audit plans. It is acknowledged that each Partner body
may have different consultation, committee reporting, and timescale
requirements. However, where practical, ttie CIAs should share their draft audit
plans to allow for consultation before the plans are finalised.
• Where possible, and with the approval of the respective Audit Committees, an
area for joint working/assurance should be considered annually. This will be
subject to the availability of resources from each Partner body. ·A joint thematic
report, bringing together the findings from each of the Partner bodies' reviews,
should be considered. However, reporting arrangements will depend on the
needs and requirements of each Partner body's Audit Committee.
• There will be regular collaboration between the CIAs of the respective bodies.
This will include a formal quarterly check in, in addition to ad hoc catch ups as
required.
• The CIAs will draw to the attention of their counterparts any significant findings
from audit work they d�em as relevant throughout the year.
• In line with their respective timelines, annual audit opinions will be shared by the
CIAs with the Internal Audit function of the respective bodies for information.
• NHS Grampian Internal Audit Reports shall be shared with the CIA of the IJBs in
line with the agreement, as set out in the hold harmless letters. Hold harmless
letters will be reviewed annually and updated as required.
APPENDIX 1
Page 83

Page 84

APPENDIX 2
Moray Council
Internal Audit Section
BODY: Health & Social Care Moray 
SUBJECT: Self-Directed Support Financial Review
REPORT REF: 22'013 
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Clear and current policy documents and operational guidelines have been developed for the financial administration of SDS
packages.
5.01 The SDS Direct Payment
guidance and financial monitoring
procedures should be reviewed
and updated on a regular basis.   
Low Yes 30/04/2022 Implemented. Implementation completed as
detailed in the follow-up report presented to
the Council’s Audit & Scrutiny Committee on
10/05/2023 (para 7 of minute refers) and
MIJB’s Audit, Performance & Risk Committee
on 29/06/2023 (para 5 of minute refers). 
Key Control: Financial reviews are being carried out to monitor the usage of SDS funding in accordance with operational guidelines.
Page 84

Page 85

Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.02 Annual financial reviews should
be undertaken in line with the
direct payment financial
monitoring procedures. 
High Yes 31/01/2022
(Revised
Implementation
Date
31/08/2023; 
Further Revised
Implementation
Date
30/09/2024) 
Part Implemented. Significant progress has
been evidenced as made in undertaking
annual financial reviews with the appointment
of a temporary Finance Assistant post in
September 2023. As an indication of the
improvement in scale, 331 reviews were
carried out in the 2024 calendar year
compared to 107 undertaken in 2023. The
additional resource has allowed all
unmanaged accounts to be subjected to an
annual review and although a backlog of
managed account annual reviews is still in
existence, this is being worked through using
a logical system of risk-based prioritisation
and all overdue reviews have been allocated
to officers within the SDS Team for future
undertaking. Accurate records are being kept
of completed activities and due reviews and
Page 85

Page 86

Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
management are employing effective
monitoring to direct limited resources to best
use. It is considered that the service is
applying focus to the financial review
requirements and are on a clear path to
address the recommendation fully by
31/03/2026 within current staff resources.   
5.03 Consideration should be given to
the routine production of reports
from the Care First System which
can be used to detail financial
reviews falling due and allow
management to prioritise
workloads accordingly. The
requirement of manual
spreadsheets should be
minimised wherever possible to
ensure information reference
Medium Yes 31/12/2021 Implemented. Implementation completed as
detailed in the follow-up report presented to
the Council’s Audit & Scrutiny Committee on
10/05/2023 (para 7 of minute refers) and
MIJB’s Audit, Performance & Risk Committee
on 29/06/2023 (para 5 of minute refers). 
Page 86

Page 87

Moray Council
Internal Audit Section 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
points come direct from the Care
First system.   
5.04 A risk based approach should be
initiated by management to
prioritise outstanding financial
reviews and work through the
backlog in an order which makes
best use of limited resources. 
High Yes 31/12/2021
(Revised
Implementation
Date
31/08/2023)
Implemented. Implementation completed as
detailed in the follow-up report presented to
MIJB’s Audit, Performance & Risk Committee
on 26/10/2023 (para 7 of minute refers) and
the Council’s Audit & Scrutiny Committee on
22/11/2023 (para 5 of minute refers). 
5.05 A reminder should be issued to
people receiving services, and
approved payroll providers where
applicable, to inform the Authority
when funds in excess of the
contingency amount are held.
This may assist in the
High Yes 30/04/2022 Implemented. Implementation completed as
detailed in the follow-up report presented to
the Council’s Audit & Scrutiny Committee on
10/05/2023 (para 7 of minute refers) and
MIJB’s Audit, Performance & Risk Committee
on 29/06/2023 (para 5 of minute refers). 
Page 87

Page 88

Moray Council
Internal Audit Section 
5
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
prioritisation of early financial
reviews and highlight issues for
further investigation. 
5.06 A review should be undertaken of
all people receiving a service in
regard to the current balances
held within their SDS bank
account. Action should then be
taken to recover excess funds. 
High Yes 30/04/2022
(Revised
Implementation
Date
31/08/2023;
Further Revised
Implementation
Date
30/09/2024)
Implemented. Annual reviews for
unmanaged accounts has allowed
appropriate surpluses to be recovered on an
ongoing basis. In relation to managed
accounts where some annual reviews remain
overdue as detailed at recommendation 5.02,
bank balances are being obtained monthly
and surpluses reclaimed where appropriate
even though a comprehensive review has not
yet been undertaken. Surpluses reclaimed in
the 24/25 financial year to date, 10 months
from April to December, amount to the
significant sum of £932,337, illustrating the
Page 88

Page 89

Moray Council
Internal Audit Section 
6
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
progress made by the SDS Team. 
5.07 In compliance with established
procedures, one-off direct
payments should be subject to a
financial monitoring review 3
months (or in limited
circumstances at another interval)
after the funding has been
distributed to confirm its
appropriate usage. 
Medium Yes 30/04/2022
(Revised
Implementation
Date
31/08/2023;
Further Revised
Implementation
Date
31/03/2024)
Part Implemented. Significant progress has
been evidenced as made in undertaking
reviews falling due, as detailed at
recommendation 5.02.  Although a small
number of one-off payment  reviews remain
overdue, the backlog is being worked through
using a logical system of risk-based
prioritisation and all overdue reviews have
been allocated to officers within the SDS
Team for future undertaking. It is considered
that the service is applying focus to the
financial review requirements and are on a
clear path to address the recommendation
fully by 31/03/2026 within current staff
resources.      
Page 89

Page 90

Moray Council
Internal Audit Section 
7
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.08 The Service should comply with
the monitoring requirements
detailed within an agreement
between the Council and the
Service User for the purchase
and adaptation of a mini van. 
Medium Yes 31/12/2021
(Revised
Implementation
Date
31/03/2023;
Further Revised
Implementation
Date
31/12/2023)
Implemented. Inspection visits have been
undertaken and current MOT, road tax and
insurance has been confirmed as held. The
regulatory requirements will continue to be
monitored by ongoing reviews for the period
of the legal agreement.   
5.09 Closing financial reviews of SDS
care packages should be
undertaken in accordance with
agreed procedures. Evidence
should be retained of any
expenditure outwith the agreed
support plan and of the full
discussions held and decisions
made by Social Workers
regarding retrospective
Medium Yes 31/12/2021
(Revised
Implementation
Date
31/08/2023;
Further Revised
Implementation
Date
30/09/2024)
Part Implemented. Significant progress has
been evidenced as made in undertaking
reviews falling due, as detailed at
recommendation 5.02 and in common with
recommendation 5.07.  Although a number of
closing reviews remain overdue, the backlog
is being worked through and all overdue
reviews have been allocated to officers within
the SDS Team for future undertaking. It is
considered that the service is applying focus
Page 90

Page 91

Moray Council
Internal Audit Section 
8
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
authorisation.  to the financial review requirements and are
on a clear path to address the
recommendation fully by 31/03/2026 within
current staff resources.         
Key Control: SDS Funding is only used to support the service user's support plan outcomes and compliance is monitored to ensure public funds
are spend appropriately. 
5.10 Care and Support Plans should
be reviewed annually to ensure
the agreed care is being provided
and continues to meet the needs
of the person receiving the
service. 
High Yes 01/05/2022
(Revised
Implementation
Date
31/08/2023;
Further Revised
Implementation
Date
30/09/2024) 
Outstanding. The issue of annual reviews of
care and support plans not being able to be
resourced has also been raised in the audit of
SDS Option 2/3 and the recent Out of Area
Placements audit. The Heads of Service have
stated a review schedule is to be established
and reviews considered as part of efficiencies
strategies. An implementation date of
31/12/2025 has now been set and progress
will be reported in the Out of Area
Page 91

Page 92

Moray Council
Internal Audit Section 
9
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Placements follow-up review in due course. 
5.11 All Social Workers should be
reminded of the requirement to
inform the SDS Team of any
amendment to a Support Plan
that will have a financial change
to a the care package of a person
receiving a service.   
High Yes 01/12/2022 Implemented. Implementation completed as
detailed in the follow-up report presented to
the Council’s Audit & Scrutiny Committee on
10/05/2023 (para 7 of minute refers) and
MIJB’s Audit, Performance & Risk Committee
on 29/06/2023 (para 5 of minute refers). 
Key Control: SDS service has effective arrangements in place to monitor support packages and report on performance.
5.12 Consideration should be given to
the development of appropriate
performance monitoring
measures to be reported to
service management on a regular
basis. Given the current backlog
of reviews and consequences of
Low Yes 30/09/2022
(Revised
Implementation
Date
31/03/2023)
Implemented. Implementation completed as
detailed in the follow-up report presented to
MIJB’s Audit, Performance & Risk Committee
on 26/10/2023 (para 7 of minute refers) and
the Council’s Audit & Scrutiny Committee on
22/11/2023 (para 5 of minute refers). 
Page 92

Page 93

Moray Council
Internal Audit Section 
10 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
direct payment accounts not
being scrutinised on a timely
schedule, it may be beneficial for
performance information to be
made available for management
to identify any resourcing issues
arising and assess risks involved. 
Page 93

Page 94

APPENDIX 3
Moray Council
Internal Audit Section
BODY: Health & Social Care Moray
SUBJECT: Self Directed Support (Options 2 & 3) 
REPORT REF: 23'025 
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Effective controls operate in the management and recording arrangements for the delivery of SDS Options 2 and 3 care
packages.   
5.1 In accordance with SDS
Regulations, evidence should be
maintained to document the
discussions held by social
workers regarding the various
care delivery options discussed
with the individual using care
services. 
High Yes 30/09/2023 Part Implemented- The Service has
developed Social Work Assessment
Guidance and documentation that includes a
requirement for supporting and recording the
conversations that need to occur with
individuals and families when determining
care delivery options. The new
documentation aims to ensure the recording
of clear and transparent discussions
regarding the decision-making on SDS
Page 94

Page 95

Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
options. A quality assurance review was
undertaken by the Service in January 2025 to
evaluate compliance with the Guidance. The
review found the majority of assessments
sampled to have the supported person’s
views on SDS options discussions recorded,
but instances were identified of no or limited
information being recorded on the supported
person’s views. An action plan is to be
developed on improvements required, and
further reviews are to be carried out by the
Service to monitor the recording of
discussions and their quality. Outcome
reporting will be overseen by monthly
meetings of the Practice Governance Board,
with the next meeting on 27/05/25. Internal
Audit Section does not intend to undertake
another formal review to evidence the
implementation of this recommendation, but
an overview of progress undertaken by the
Page 95

Page 96

Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Service will be done when undertaking a
follow-up review of other recommendations
within this audit. 
5.2 Documented procedures should
be developed to support social
workers and individuals using
care services in the selecting of
SDS care delivery options. 
High Yes 31/03/2024
(Revised
Implementation
Date
30/09/2025)
Part Implemented- Comprehensive Social
Work Assessment Guidance to support
officers has been developed by the Service
and put into operational use. An objective of
the Guidance is to support a clear and
transparent decision-making process and
promote consistency whilst aligning with
national and local policy requirements and
best practices. However, additional work is
required on updating the information available
to individuals through guides and internet
content to SDS standards and further
developing the Resource Allocation System.
A revised date of 30/09/2025 for full
Page 96

Page 97

Moray Council
Internal Audit Section 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
implementation has been agreed. 
5.3 An annual reference document
detailing a breakdown of the rates
paid to care providers should be
provided to all relevant officers to
assist in budgetary planning and
the accurate preparation of an
individual's support package.   
High Yes 30/06/2023
(Revised
Implementation
Date
01/04/2025)
Outstanding. An annual reference document
is maintained and made available to all
relevant officers to assist in the costing of
support packages. However, the document
has not been revised to include a breakdown
of costs for block funding arrangements.
Work is currently ongoing, together with the
budget savings plan, to identify the
appropriate costing breakdown required for
block funded services.  A revised
implementation date of 01/04/2025 was
agreed during this follow up review.
Verification regarding the implementation of
the recommendation will be done when
undertaking the next follow up review for this
Page 97

Page 98

Moray Council
Internal Audit Section 
5
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
audit.
5.4 All officers should be reminded to
update the CareFirst System to
ensure the database is up-to-date
and accurate for each individual
using care services. 
High Yes 30/09/2023 Implemented. The required content of the
CareFirst System is set out in the new Social
Work Assessment Guidance referred to in
5.1.  Training programmes are being
overseen by the SDS Consultant Practitioner,
and quality assurance and review activities
undertaken by the Service to evaluate the
effectiveness of the new guidance in
achieving the required case recording
standards. This will continue to be monitored
by further Service reviews and outcome
reporting will be overseen by monthly
meetings of the Practice Governance Board,
with the next meeting  on 27/05/25.  
5.5 A tripartite agreement between Medium Yes 30/09/2024
(Revised
Part Implemented- A random sample of
Option 2 packages commencing in 2024/25
Page 98

Page 99

Moray Council
Internal Audit Section 
6
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
the individual using the care
service, Council and care
provider should be agreed for all
SDS Option 2 care packages. 
Implementation
Date
31/07/2025)
was selected, and they all had a valid
tripartite agreement in place. However, further
to discussions with officers, a review of
service provider payments is to be
undertaken to identify any gaps in historical
packages to ensure all Option 2 individuals
receiving a social care service have a
tripartite in place. A revised date for full
implementation of the recommendation by
31/07/2025 has been agreed with the
Service.   
5.6 A contractual agreement detailing
service delivery and costs should
be agreed with the 3 providers of
day care services noted within
the findings. 
High Yes 31/03/2024
(Revised
Implementation
Date
31/08/2025)
Outstanding. Contractual agreements with
the 3 providers are not yet in place. However,
work has been ongoing in line with the budget
savings plan which will inform the service
requirements and costs. This exercise is
intended to be completed by 31/03/2025 and
will allow contractual arrangements to be
Page 99

Page 100

Moray Council
Internal Audit Section 
7
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
created for these services via a framework
agreement. A revised implementation date of
31/08/2025 has been agreed with the Adult
Social Care Commissioning Service.
5.7 Annual support plan reviews of
individuals in receipt of SDS
Option 2 and 3 care packages
should be undertaken in
accordance with agreed
procedures. 
High Yes 30/09/2024
(Revised
Implementation
Date
31/12/2025)
Outstanding. The recommendation of the
requirement to undertake annual reviews of
care and support plans was also detailed
within the audit of SDS Option 1 and the
recent Out of Area Placements review. The
Heads of Service have stated that a review
schedule is to be established, and the need to
undertake annual reviews of care and support
plans for individuals receiving social care
services is to be considered as part of
efficiency strategies. A revised
implementation date of 31/12/2025 has now
been agreed.   
5.8 Consideration should be given for Medium Yes 30/09/2023 Implemented. A Standard Operating
Page 100

Page 101

Moray Council
Internal Audit Section 
8
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
management to undertake
regular reviews of the accuracy
and recording of the checks
completed to ensure the accuracy
of payments made to care
providers. 
Procedure (SOP) has been developed to
comprehensively detail all checks required for
invoice processing. A management review of
a sample of invoices is being carried out on a
monthly basis, to confirm verification checks
have been fully undertaken in line with the
SOP. The performance of the management
review has been evidenced as recorded on
the invoice monitoring spreadsheet
maintained by Community Care Finance. 
5.9 The Council's charging policy
should be reviewed in regard to
day care and a decision made as
to whether a charge should be
levied for the service in the future. 
High Yes 30/09/2023
(Revised
Implementation
Date
30/09/2025)
Outstanding. The Charging and
Contributions Policy has not yet been
reviewed due to staffing resourcing issues.
However, the Charging and Contributions
Policy is planned for review as part of the
ongoing savings work within the Service. A
working group is reviewing the issue,
Page 101

Page 102

Moray Council
Internal Audit Section 
9
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
considering its alignment with the COSLA
Non-Residential Charging Policy. The
outcome of the review and potential charging
for day care services is planned to be
presented to the MIJB for decision. A revised
implementation date of 30/09/2025 has been
agreed with the Service. It is appreciated the
decision will thereafter be required to be
considered by Moray Council under their
statutory duties for the setting of charges,
ahead of the 2026/27 budget setting process. 
5.10 A review of arrangements
regarding the authorisation of
individual care packages should
be undertaken. Thereafter,
authorisation requirements
should be documented and
Medium Yes 31/08/2023
(Revised
Implementation
Date
30/06/2025)
Outstanding. Full review and documentation
of care package authorisation requirements
have not been resourced to date. Significant
temporary measures have been implemented
as a result of work on the budget savings
plan, including the creation of a High Cost
Page 102

Page 103

Moray Council
Internal Audit Section 
10 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
communicated to all appropriate
officers.   
Package Panel for appropriate authorisation,
however expansion of the review and
documentation is required. This is to be taken
forward with urgency by the Service, with a
full review of authorisation levels and
documentation aligning to the development of
the Resource Allocation process and with
consideration given to the Financial
Regulations. A revised implementation date
of 30/06/2025 has been agreed with the
Service. 
Page 103

Page 104

APPENDIX 4
Moray Council
Internal Audit Section
DEPARTMENT: Health & Social Care Moray
SUBJECT:  Moray Integrated Community Equipment Stores 
REPORT REF: 24'013 
Follow Up Audit Review 
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
Key Control: Effective systems and procedures operating to ensure accurate records are maintained to account for all occupational therapy
equipment held within Stores and issued to people who access the service.
5.1 A full stock check should be
undertaken to ensure records
correspond to the actual number of
items held within Stores. 
Items of equipment should be kept
High  Yes  31/03/2024  Implemented– The review confirmed that
Stores officers completed a full stock check
after implementing new stock management
arrangements. The stock take was verified by
an officer from the Internal Audit Section with
only minor variances noted between system
recorded figures and the actual stock held.
Variances were investigated and explanations
obtained. 
Page 104

Page 105

Moray Council
Internal Audit Section 
2
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
wherever possible in Asset Number
order within the Stores Building.
Asset Numbers should be clearly
recorded where possible on
shelving. 
Medium Yes 31/03/2024 Implemented- Asset numbers are now
clearly recorded on shelving used for storing
equipment.  Shelf locations across the Store
have also been added to the Stores Software
Application (ELMS).   
5.2 The software application used for
purchasing equipment should be
regularly updated with the stock
issued to ensure an accurate unit
price is maintained. 
Further exploration should be
undertaken of ELMS with the
purpose of enabling the direct
purchase of equipment. 
Medium 
Medium
Yes 
Yes
31/03/2024
(Revised
Implementation
Date
30/06/2025) 
31/10/2024
(Revised
Implementation
Date
30/06/2025)
Outstanding– The review found that the
software application used for purchasing
occupational therapy equipment, which is
separate from  ELMS, was not regularly
updated with the stock issued. This impacts
the accuracy of individual stock valuations. 
Outstanding- The Service is making
enquiries with the software provider for ELMS
to check whether it could provide stock
valuations in accordance with accounting
requirements. However, alternative solutions
may be required. The outcome of these
Page 105

Page 106

Moray Council
Internal Audit Section 
3
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation 
investigations will be reported to the
Operational Management Team so that a
preferred solution can be decided. A revised
implementation date of 30/06/2025 has been
agreed with the Service.   
5.3 A review should be undertaken of
the current policy of revaluing re-
used items of equipment at 50% of
the original unit price. 
Medium Yes  31/01/2024
(Revised
Implementation
Date
30/06/2025)
Outstanding-  The decision to revalue re-
used equipment at 50% of the original
purchase price is still under review. The
Service has indicated they intend to provide a
report to members of the MIJB at the
conclusion of this exercise. A revised
implementation date of 30/06/2025 has been
agreed with the Service.  
5.4 People who access the service
should be advised that any
equipment received should be
included within their personal
property content insurance.
Medium Yes 31/01/2024
(Revised
Implementation
Date
30/06/2025) 
Outstanding–  This recommendation is still
under review by the Service. A report on this
issue is intended to be provided to MIJB
members. A revised implementation date of
30/06/2025 has been agreed with the
Service.
Page 106

Page 107

Moray Council
Internal Audit Section 
4
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
5.5 Maximum and minimum stock levels
should be implemented in ELMS to
assist officers in ensuring the
effective management of stock
levels.
Medium Yes 31/03/2024 Implemented- The review has confirmed that
maximum and minimum stock level functions
are now used within ELMS. The Service also
intends to review these stock level
parameters regularly. 
5.6 A record should be maintained of the
stock checks undertaken, and any
adjustments to stock figures for
equipment recorded within ELMS
should require the authorisation of
the supervisor. 
Medium Yes 31/01/2024 Implemented– Records of weekly stock
checks are now maintained. It was also
confirmed that adjustments to stock levels
within ELMS can now only be authorised by
supervisory officers.
5.7 In regard to the stock of returned
specialised chairs noted during the
audit review, a decision should be
undertaken regarding their future
use. 
Medium Yes 31/03/2024 Implemented- The Service has decided to
retain the chairs. A meeting between officers
from the Equipment Stores of Aberdeen City,
Aberdeenshire and Moray agreed to explore
options regarding the use of these chairs and
other equipment within the Grampian area. In
addition, the Service has advised that the
chairs could be adapted to meet the specific
Page 107

Page 108

Moray Council
Internal Audit Section 
5
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
needs of individuals, potentially providing an
alternative to procuring new items. 
5.8 Further development should be
undertaken of ELMS to enable
greater use of the software
application in the management of
stock items. 
Medium Yes 31/03/2024 Implemented– It was found that the Service
is making greater use of the reporting
functions within ELMS. In addition, data from
ELMS is exported to another software
application to allow for greater analysis of
information. 
5.9 Officers should be instructed to
utilise the facility within ELMS to
mark stock as out for delivery. 
Low Yes 30/06/2024 Implemented- Procedures are now in place
requiring drivers delivering equipment from
Stores to mark equipment as out for delivery
within ELMS. 
5.10 A review of off contract expenditure
should be carried out and where
necessary contracts developed.
Low Yes 31/03/2024
(Revised
Implementation
Date
30/06/2025)
Part Implemented- A contract review for
procurement of occupational therapy
equipment is being undertaken. This includes
developing contacts that include a specialised
type of chairs currently procured off contract.
A revised implementation date of 30/06/2025
has been agreed with the Service.
5.11 A formal procedure should be Medium Yes 29/02/2024 Implemented- A record of all NHS officers
Page 108

Page 109

Moray Council
Internal Audit Section 
6
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation
established for maintaining a list of
NHS officers requiring access to
ELMS.
with authorised access is maintained,
including confirmation of up-to-date data
protection training. The audit also confirmed
regular reviews are undertaken that check for
officers on-going access requirements to
ELMS. 
5.12 Current operating practices should
be recorded within a Service
Operating Manual.
Medium Yes 31/03/2024 Implemented - Operating Procedures are
now in place to provide officers with a point of
reference guidance in the administration of
the Moray Integrated Community Equipment
Store.
5.13 A review of service procedures
should be undertaken to ensure the
Store is informed of a change in
circumstances in an individual’s
condition where an item of
equipment may no longer be
required. Arrangements should then
be undertaken for collection at the
earliest opportunity.
Medium  Yes  29/02/2024  Implemented- The Moray Integrated
Community Equipment Service is informed of
equipment issued to an individual but is no
longer required. Testing has confirmed that
when informed, arrangements are made for
the collection of this equipment. 
Page 109

Page 110

Moray Council
Internal Audit Section 
7
Risk Ratings for Recommendations
High Key controls absent, not being
operated as designed or could be
improved. Urgent attention required.
Medium Less critically important controls
absent, not being operated as
designed or could be improved.
Low Lower level controls absent, not
being operated as designed or
could be improved.
No. Audit Recommendation Priority Accepted
(Yes/ No)
Date of
Completion
Status / Explanation 
If no agreement can be made for
the equipment to be returned to
the Store, consideration should
be given to invoicing  the
individual for the item. 
Medium  Yes  31/01/2024
(Revised
Implementation
Date
30/06/2025) 
Outstanding – A review of whether there
should be invoicing for equipment not
returned is currently on-going within the
Service. It is intended to report to members of
the MIJB on this issue. A revised
implementation date of 30/06/2025 has been
agreed with the Service.
5.14 Improvements identified to the
Service during the audit review
regarding the physical security of the
Moray Integrated Community
Equipment Store building should be
implemented as a matter of urgency.  
High Yes 31/03/2024 Implemented - A new alarm system has
been fitted at the Moray Integrated
Community Equipment Store and is now in
operation. 
Page 110

Page 111

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 19 JUNE 2025 
SUBJECT: INTERNAL AUDIT ANNUAL REPORT – 2024/25 
BY:  CHIEF INTERNAL AUDITOR 
1. REASON FOR REPORT 
1.1 This report provides Committee with details of internal audit work undertaken
relative to the Moray Integration Joint Board (MIJB) for the financial year
ended 31 March 2025, and the assurances available on which to base the
internal audit opinion on the adequacy of the MIJB’s systems of internal
control. 
2. RECOMMENDATION 
2.1  The Committee is asked to consider the contents of the annual report
given as Appendix 1 to this report and seek clarification on any
matters relating thereto. 
3.  BACKGROUND 
3.1 The purpose of this report is to present the Committee with the Internal Audit
Annual Report for the year to 31 March 2025 which includes the Chief Internal
Auditor’s independent assurance opinion on the adequacy of the MIJB’s
systems of internal control. 
4.  KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1  The Public Sector Internal Audit Standards (PSIAS) require that the Chief
Audit Executive (CAE), the MIJB’s Chief Internal Auditor, to provide an annual
internal audit opinion and report on the adequacy and effectiveness of the
MIJB’s systems of governance, risk management and internal controls to
support the preparation of the Annual Governance Statement. This is in
support of the overall governance arrangements of the MIJB. 
4.2    The report covers the year to 31 March 2025 and is provided in Appendix 1. 
Item 8.
Page 111

Page 112

5.  SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes Improvement Plan
(LOIP)) and Moray Integration Joint Board Strategic Plan “Moray
Partners in Care 2022-2032” 
Internal audit work supports good governance and assists in securing
appropriate  systems of internal control. 
(b) Policy and Legal
The Internal Audit Service is provided in terms of paragraph 7:1 of the
Local Authority Accounts (Scotland) Regulations 2014, and there is a
requirement to provide a service in accordance with published Public
Sector Internal Audit Standards. 
(c) Financial Implications 
No implications directly arising from this report. 
(d) Risk Implications and Mitigation
No direct implications. 
(e) Staffing Implications
No implications directly arising from this report 
(f) Property
No implications. 
(g) Equalities/ Socio Economic Impacts 
No implications. 
(h) Climate Change and Biodiversity Impacts
None directly arising from this report. 
(i) Directions 
None arising directly from this report. 
(j) Consultations
There have been no direct consultations during the preparation of this
report. 
6. CONCLUSION 
6.1 This report provides a summary overview of the nature and extent of
audit work carried out during the year, and informs the annual internal
audit opinion on the internal control environment operating within the
MIJB. 
Author of Report:  Dafydd Lewis, Chief Internal Auditor 
Background Papers: Internal Audit Files
Ref:    mijb/ap&rc/19062025 
Page 112

Page 113

APPENDIX 1
INTERNAL AUDIT
ANNUAL REPORT and OPINION
1 APRIL 2024 to 31 MARCH 2025
Page 113

Page 114

CONTENTS
PAGE
SECTION-1 INTRODUCTION 3
SECTION 2 BASIS OF OPINION 4
SECTION 3 SUMMARY AND LIMITATIONS OF WORK THAT
SUPPORTS OPINION
4 - 7
SECTION 4 OPINION 7-8
Page 114

Page 115

SECTION 1 – INTRODUCTION
Purpose of this report
The Public Sector Internal Audit Standards (PSIAS) require the Chief Internal
Auditor to provide a written statement to inform the Annual Governance Statement.
This report constitutes the required statement. In compliance with the PSIAS, this
report presents an opinion on the overall adequacy and effectiveness of the Moray
Integration Joint Board’s (MIJB) risk management, control, and governance
processes, based on the work performed by the Internal Audit Section. In addition,
my evaluation includes an assessment of reports issued by other review agencies.
The scope of internal audit work, the responsibilities of Internal Audit and the
assurance provided on the adequacy and effectiveness of the MIJB’s internal
control system are explained further in Section 4 of this report.
Responsibilities of Management and Internal Audit
It is management’s responsibility to maintain systems of risk management, internal
control and governance. Internal audit is an element of the internal control
framework established by management to examine, evaluate and report on
accounting and other controls over operations. Internal audit assists management
in effectively discharging its responsibilities and functions by examining and
evaluating controls. Internal audit cannot be held responsible for internal control
failures.
The role of internal audit includes assessing the adequacy of risk management,
internal controls, and governance arrangements put in place by management, as
well as performing testing on a sample of transactions to ensure those controls
were operating effectively during the period under review. The Audit and Risk
Manager of Moray Council is the appointed Chief Internal Auditor of the MIJB.
Moray Council’s Internal Audit Section allocates a portion of its available audit days
to review the systems and practices of the MIJB. In addition, during 2024/25, an
agreement was obtained from the management of NHS Grampian and their
Internal Audit Provider to share their audit reports, which will also support the
annual internal audit opinion on the MIJB’s internal control environment.
The Public Sector Internal Audit Standards (PSIAS) require officers of the Internal
Audit Section to communicate promptly any facts or matters that may affect their
independence. This report confirms that all staff members involved in the 2024/25
internal audit reviews were independent of operational processes and that their
objectivity was not compromised.
Page 115

Page 116

SECTION 2 –BASIS OF OPINION 
My evaluation on the adequacy and effectiveness of the MIJB framework of
governance, risk management and internal control is based on the following: 
• The audit work undertaken by the Moray Council Internal Audit Section during
the year to 31 March 2025.   
• The audit work undertaken by the Internal Audit Provider of NHS Grampian
for the year ended 31 March 2025. 
• Any issues highlighted in the governance statement by the Chief Officer of
the MIJB for the year ended 31 March 2025. 
• Reports issued by the MIJB’s External Auditor and other external review
agencies. 
• My knowledge of the MIJB’s governance, risk management and performance
monitoring arrangements. 
Assurance is also based on the wider audit work conducted by the Chief Internal
Auditor in his capacity as the Audit and Risk Manager of the Moray Council. 
SECTION 3- SUMMARY AND LIMITATIONS OF WORK THAT SUPPORTS THE
OPINION 
Progress on the 2024/25 Internal Audit Plan                                  
The Internal Audit Section operates independently within the organisation, and I can
confirm that management has imposed no limitations on the scope of audit work.
The Internal Audit Annual Audit Plan presented to the Audit, Performance and Risk
Committee describes in some detail the framework around which audit work is
developed. In addition, the selection of audit topics was made with regard to
corporate planning documents, budget data, and information drawn from the
corporate risk register. Input from senior management regarding possible areas for
audit was also taken into account.
The internal audit work has been conducted in accordance with an established
methodology that promotes quality and conformance with the Public Sector Internal
Audit Standards and the agreed Internal Audit Annual Audit Plan. 
A summary of the audit projects completed from the MIJB Audit Plan is summarised
as follows:
• An audit was undertaken of the administrative arrangements for fostering and
kinship care payments. The audit scope reviewed policies and procedures for
the management of fostering and kinship payment of fees and allowances are
administered in accordance with these policies and procedures and are
operating within budgetary control. 
• It is pleasing to report that within the scope of the audit; the management of
fostering and kinship payments was well managed. However, some
administrative control improvements were noted concerning the recording of
information and the introduction of additional verification checks to confirm
eligibility for ongoing kinship allowance payments.  Page 116

Page 117

• A review was undertaken of the MIJB’s governance arrangements to prevent
fraud and corruption. The Chartered Institute of Public Finance and
Accountancy Code of Practice on Managing the Risk of Fraud and Corruption
was used as the template for developing an audit programme of testing to be
undertaken. This review was done as part of a joint audit exercise with the
internal audit providers of NHS Grampian and Aberdeenshire, and Aberdeen
City Integration Joint Boards. As the Integration Joint Boards deliver services
through officers and systems of the Council and NHS Grampian, this
approach has allowed for a more overarching and complete review to be
undertaken. 
• Findings noted that further improvements are needed in developing agreed
procedures between the internal audit services and the NHS Counter Fraud
Authority, as officers of both NHS Grampian and the Council use systems of
both organisations to deliver services. Recommendations also included a
need to develop more effective reporting of irregularities and administrative
arrangements. 
• An audit was undertaken of the systems and procedures supporting the
delivery of services to individuals receiving adult care services who are
classified as out of area (OOA). The review involved randomly selecting a
sample of OOA placements to examine the arrangements for care delivery,
determine the ordinary residence status, and assess the contract
management agreements with care service providers. The audit identified
significant concerns regarding the progress made in determining the ordinary
residence status of individuals receiving adult care services, the contractual
arrangements with care providers, and the recording and budgetary
management of OOA placements. 
• A review was undertaken of residential care. The scope of the audit was to
examine the processes for making accurate payments at agreed contract
rates to third-party providers for the delivery of permanent residential care.
Testing included verifying that all residents entering a residential care home
following a care needs assessment had been financially assessed in
accordance with the Charging for Residential Accommodation Guidance
(CRAG) issued by the Scottish Government. A check was also made to verify
the accuracy of the calculation of assessed contributions toward care costs,
as well as the administrative arrangements for processing and paying third-
party care providers. The audit found that the systems for administering
financial assessments of residential care home residents and verifying and
processing payments to third-party care home providers are significantly
paper based. This has proved challenging, and consideration should be given
to the digitalisation of this process. Further administrative improvements were
also identified, including the need for improved information management
arrangements and more efficient completion of financial assessments for
individuals entering residential care homes. 
• The Internal Audit Section reports follow-up reviews to evidence the
implementation of recommendations to the Audit, Performance and Risk
Committee. It is appreciated the demands on services, however the follow-
up audits undertaken of Self Directed Support and the Moray Integrated
Community Stores found a number of recommendations where revised
timescales for the implementation of recommendations were required. The
Page 117

Page 118

need to revisit audit reviews to evidence the implementation of
recommendations has resulted in an additional workload commitment for the
Internal Audit Section. Implementation of recommendations is a key
determinant in assessing the adequacy and effectiveness of the internal
control system. If recommendations are not implemented in a timely manner,
then weaknesses in control and governance frameworks will remain. While
the demands on officers’ time are acknowledged, delays in responding to
audit queries and recommendations can be challenging and does impact the
timely reporting of audit reviews to the Committee. 
• A previous audit review of Social Care Information Governance identified the
need to explore the development of a unified case recording system. It is
encouraging to note that the Service is actively seeking a replacement for the
current social work and social care case management system. However, it is
essential that this is progressed in a timely manner, given that it involves the
management and recording of highly sensitive information.
• On a more positive note, as the Chief Internal Auditor of the MIJB, my role
requires assurances of internal controls of systems and practices needed to
deliver services, irrespective of whether they use Council or NHS systems.
In the past members of the Audit, Performance and Risk Committee have
been provided with audit reports of reviews undertaken regarding operating
practices that use Moray Council owned systems due to my role as the
Council’s Auditor. However, over the last year, an agreement has been
reached with the senior management of NHS Grampian and their Internal
Audit Provider to allow me to receive copies of NHS Grampian's internal audit
reports of interest to the MIJB.  Moving forward, this will enable members to
have a more overarching opinion of MIJB governance and internal control
arrangements irrespective of whether Council or NHS Grampian systems are
used in the delivery of services. 
Governance - from a review of the Annual Governance Statement prepared for
inclusion within the MIJB accounts, it was found to have been prepared in line with
good practice guidance issued by CIPFA / SOLACE. The statement included an
assessment of the effectiveness of governance arrangements within the MIJB
regarding the seven principles of good governance identified within the guidance. It
also referenced the governance processes of the principal partner bodies (NHS
Grampian and Moray Council) as sources of additional assurance. 
A review of the Moray Council’s Chief Social Work Officer's annual report noted
several governance arrangements to ensure effective service delivery. The quality
of social work services is assured by the Practice Governance Board. However, the
report details the financial challenges faced by Health and Social Care Partnership
in Moray with “increasing overspend” against budgets and a need “to identify where
savings can be made and where efficiencies can be created by doing things
differently”. In addition, the report also details difficulties in recruiting social workers
and social care staff, resulting in additional workloads for officers. As the Chief
Internal Auditor, I note significant challenges faced by the Service. 
An audit review of Adult Social Care Commissioning Service undertaken by KPMG
Governance, Risk & Compliance Services and reported to the Audit, Performance
and Risk Committee (item 11) on 30 March 2023. The need for this review was
highlighted due to concerns raised by senior Health & Social Care Moray
management regarding administrative arrangements within the Adult Social Care
Commissioning Service. Regular reporting has been undertaken to the Audit,
Performance and Risk Committee on the progress of implementing the
Page 118

Page 119

recommendations of improvements detailed within the audit report.  It is pleasing to
note that a recent report to the Audit, Performance and Risk Committee indicated
that the implementation of recommendations is nearly complete. An internal audit
review to verify the implementation of the recommendations from the review of the
Adult Social Care Commissioning Service is included in the 2025/26 Annual Audit
Plan.  
Risk Management - procedures are well developed with a risk management policy
and strategy in place, a risk appetite statement has been prepared, and a risk
register has been reviewed and updated regularly. The Risk Register summarises
the principal risks facing the organisation under nine themes; these themes focus
on critical risk areas, including finance, environment and operational continuity,
together with transformation risks associated with change and infrastructure given
the reliance of the MIJB on support from both the Council and the NHS.
Statement on Conformance with the Public Sector Internal Audit Standards 
The Local Authority Accounts (Scotland) Regulations 2014 require public bodies
to operate a professional and objective internal auditing service in accordance with
recognised standards and practices in relation to internal auditing, the Public
Sector Internal Audit Standards (PSIAS). A requirement of PSIAS is that an
External Quality Assessment (EQA) is undertaken every 5 years. 
All Scottish local authorities are required to have an External Quality Assessment
(EQA) every 5 years. As part of the Council’s membership of the Scottish Local
Authorities Chief Internal Auditors’ Group, it was agreed that this EQA requirement
would be met by each local authority's internal audit service undertaking a review
of another council and will thereafter receive a review in return. An EQA of the
Council’s Internal Audit Section was completed by the Chief Internal Auditor of
Perth and Kinross Council, and the findings were reported to the Audit,
Performance and Risk Committee on 26 September 2024. The overall conclusion
of the external assessment is that the Internal Audit Section fully conforms to the
PSIAS. This represents the highest level of performance standards in the delivery
of an internal audit service and should provide assurance regarding the
effectiveness of the current internal audit arrangements. 
The Public Sector Internal Audit Standards also require the Chief Internal Auditor
to consider whether or not the audit staffing resources are sufficient to meet the
audit needs of the organisation and where it is believed that the level of resources
may adversely impact the provision of the annual internal audit opinion and draw
this to the attention of the Committee. Unfortunately, I must again raise my
concerns about whether the current staffing levels in the Internal Audit Section are
sufficient to meet future auditing requirements. An attempt was made to appoint a
part-time auditor; however, this was unsuccessful. The position is now being re-
advertised. Members of the Audit, Performance and Risk Committee will be kept
informed of any developments regarding staffing and their impact on the delivery
of the internal audit service. 
SECTION 4 – OPINION 
Any system of control can only ever provide reasonable and not absolute
assurances that control weaknesses or irregularities do not exist or that there is no
risk of error, fraud, or breaches of laws or regulations. Furthermore, it is the
responsibility of management to establish an appropriate internal control system
and monitor its effectiveness. The Chief Internal Auditor is responsible for
providing an annual assessment of the robustness of the internal control
system.  (Assurance was obtained in the interim form at the time of drafting this
report from the Internal Audit Provider of NHS Grampian).  Page 119

Page 120

As the appointed Chief Internal Auditor, I am required to provide an opinion on the
systems of governance and internal control of the Moray Integration Joint Board.
This assessment has been particularly challenging for 2024/25. The Service has
made progress by introducing improved governance arrangements, notably
through regular reporting on the implementation of audit recommendations at
Senior Management and Practice Governance Board meetings. However,
significant findings have emerged from the audits undertaken, and follow-up
reviews have identified recommendations that remain outstanding and require
revised implementation dates. Furthermore, advancing the development of a
single case recording system within the Service continues to be a matter of
significant importance. After careful consideration, it is my opinion that I can only
provide limited assurance that the Moray Integration Joint Board has adequate
systems of governance and internal control. 
Dafydd Lewis
Chief Internal Auditor
13 May 2025 
Page 120

Page 121

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 19 JUNE 2025 
SUBJECT:  UNAUDITED ANNUAL ACCOUNTS 
BY:  CHIEF FINANCIAL OFFICER 
1. REASON FOR REPORT 
1.1 To inform the Committee of the Unaudited Annual Accounts of the Moray
Integration Joint Board (MIJB) for the year ended 31 March 2025. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
i) consider and scrutinise the unaudited Annual Accounts and
recommend approval to the MIJB to be submitted to the external
auditor, noting that all figures remain subject to audit, in Appendix 1; 
ii) note the Annual Governance Statement contained within the
unaudited Annual Accounts and in Appendix 3; 
iii) note the accounting policies applied in the production of the
unaudited Annual Accounts, pages 47 to 48 of the accounts; and 
iv) approve the updated Local Code of Corporate Governance which
supports the Annual Governance Statement, in Appendix 2. 
3. BACKGROUND 
3.1 The Public Bodies (Joint Working) (Integration Joint Boards) (Scotland) Order
2014 requires that an integration joint board is subject to the audit and accounts
regulations and legislation of a body under Section 106 of the Local
Government (Scotland) Act 1973.   
3.2 The Local Authority Accounts (Scotland) Regulations 2014 (2014 Regulations),
places a statutory obligation on the MIJB to submit draft Annual Accounts for
the year ended 31 March 2025 to its external auditors by 30 June 2025 and the
audited annual accounts are required to be approved by the MIJB and
published by 30 October each year. 
Item 9.
Page 121

Page 122

3.3 A copy of the unaudited accounts is attached at Appendix 1. 
3.4 The MIJB has a statutory duty to conduct a review at least once in each
financial year of the effectiveness of its system and to include a statement
reporting the review within its Statement of Accounts.  The MIJB does this
through its Annual Governance Statement which is published as part of its
Annual Accounts. 
3.5 The MIJB has established arrangements and continues to develop its
governance framework which includes the system of internal control.  This
system is intended to manage risk and support the achievement of the MIJB’s
policies, aims and objectives.  Reliance is placed on NHS Grampian and Moray
Council systems of internal control that support compliance with both
organisations’ policies and promotes achievement of each organisation’s aims
and objectives; to the extent that these are complementary to those of the
MIJB. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The Annual Accounts have been prepared in accordance with the Code of
Practice on Local Authority Accounting in the United Kingdom 2024/25 (the
Code) which is underpinned by the International Financial Reporting Standards
(IFRS). 
4.2 Grant Thornton, under the Local Authority Accounts (Scotland) Regulations
2014 is required to complete their audit by 30 September 2025, as reported
previously, Grant Thornton is unable to meet this deadline.  The audited
accounts and the External Auditor’s report will be submitted to the MIJB at a
special meeting on 30 October 2025 prior to publication.   
4.3 The Comprehensive Income and Expenditure Statement shows a deficit of
£0.536m on the provision of services for the year.  As at 31 March 2025, the
Balance Sheet showed total Reserves of £1.45m.  This increase is primarily
due to transfer of reserves from Moray Council to MIJB relating to Asylum
seekers grant,during the year.  Note 7 within the unaudited accounts breaks
down the Reserves between what is General Reserve and available for
utilisation and supporting the budget and what is earmarked for specific
purposes. 
4.4 The unaudited accounts are given at Appendix 1 and consist of the following: 
Management Commentary – provides the context through narrative that
supports the financial statements.  It describes the strategic intent of the
MIJB, together with its performance through the year, highlighting areas of
risk.  It also provides some forward thinking on the forthcoming year and
planned developments. 
Remuneration Report – details the pay and pension benefits accrued by the
MIJB senior officers during 2024/25. 
Annual Governance Statement – is a means of reporting publicly on the
MIJB’s governance arrangements, and seeks to provide assurance that its
business is conducted in accordance with law, regulations and proper
practices and that public money is safeguarded and properly accounted for.
Page 122

Page 123

Financial Statements – provides detail of the main financial transactions
through the Comprehensive Income & Expenditure Statement, Movement in
Reserves Statement, and Balance Sheet. 
Notes to the Accounts – explains the use of accounting policies and
provides supporting information to the main financial statements. 
4.5 As at 31 March 2025 there were significant variances between budget and
actual on several services.  These are evident in the summary on the major
variances included within the Management Commentary on pages 16 to 17. 
More details are included in the separate report, Revenue Budget Outturn for
2024/25, on this Boards agenda. 
4.6 In April 2016 an updated CIPFA/SOLACE ‘Delivering Good Governance in
Local Government: Framework’ was published.  The framework, whilst written
in a local authority context, is applicable to integration authorities particularly as
legislation recognises an IJB as a local government body under part VII of the
Local Government (Scotland) Act 1973. 
4.7 The Framework defines the principles that should underpin the governance
arrangements and provides a structured approach.  On 24 June 2021, the MIJB
approved an updated Local Code of Corporate Governance based on the
Framework and adopting the principles by which to evaluate performance (para
8 of the minute refers).  The principles as set out in the CIPFA/SOLACE
Framework are: 
a. Behaving with integrity, demonstrating strong commitment to ethical
values and respecting the rule of law,
b. Ensuring openness and comprehensive stakeholder engagement,
c. Defining outcomes in terms of sustainable economic, social and
environmental benefits,
d. Determining the interventions necessary to optimise the achievement
of intended outcomes,
e. Developing the entity’s capacity, including the capability of its
leadership and the individuals within it,
f. Managing risk and performance through robust internal control and
strong public financial management; and
g. Implementing good practices in transparency, reporting and audit to
deliver effective accountability 
4.8 The term ‘Local Code’ refers to the governance structure in place and is a
statement of the policies and procedures by which functions are directed and
controlled and how engagement with service users, the local community and
other stakeholders is carried out.  The collective policies and procedures of the
MIJB constitute a Local Code of Corporate Governance. 
4.9 The MIJB can achieve good governance by demonstrating that its governance
structures comply with the principles as set out in the Framework.  Regular
review is carried out to assess the MIJB’s performance against the principles,
identify areas for development and inform the Annual Governance Statement.
Appendix 2 displays the sources utilised in assessing MIJB’s compliance
against each governance principle.  With regard to the partnership model of
operation, reliance is also placed on the systems and procedures of Moray
Page 123

Page 124

Council and NHS Grampian and so for completeness, assurance sources are
listed for these organisations. 
4.10 Whilst the MIJB has received limited assurance from Internal Auditor, again for
2024/25 progress is being made to rectify this. Procedures are in place to
ensure all audit recommendations and dates are not only achievable but are on
the agendas for internal meetings, with oversight by the Senior Management
Team. The replacement of the social care information system is in progress,
although will take 18 months to 2 years to fully implement. The governance
statement from NHS Grampian is attached at Appendix 3, gives assurance
there are no significant control weaknesses. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Moray Partners in Care 2022-2032”
The unaudited Annual Accounts have been completed and are available
for audit inspection within the specified timescale.  
(b) Policy and Legal
The Public Bodies (Joint Working) (Scotland) Act 2014 requires that the
MIJB is subject to the audit and accounts provisions of a body under
Section 106 of the Local Government (Scotland) Act 1973.  The MIJB’s
accounts are prepared in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2024/25 which is
underpinned by IFRS. 
(c) Financial implications
The unaudited Annual Accounts provide all required information about
the MIJB in relation to its financial position at 31 March 2025.  The
overriding principle in relation to annual accounts preparation is to
provide a true and fair view. 
(d) Risk Implications and Mitigation
There are no risk issues arising directly from this report. The unaudited
Annual Accounts will be subjected to audit by external auditors, Grant
Thornton, which will provide assurance that the Accounts for 2024/25
give a true and fair view of the financial position and expenditure and
income of the MIJB for the year ended 31 March 2025. 
Effective governance is essential in providing the framework for the MIJB
to conduct its business.  The annual review of governance arrangements
aims to ensure that internal controls, risk management and associated
governance arrangements are being constantly developed with the aim
of providing reasonable assurance on the framework as a whole. 
Regular review and application of a Local Code of Corporate
Governance supports this process. 
(e) Staffing Implications
None arising directly from this report. 
(f) Property
None arising directly from this report.
Page 124

Page 125

(g) Equalities/Socio Economic Impact
None arising directly from this report as there has been no change to
policy as a result of this report. 
(h) Climate Change and Biodiversity Impacts
There are no direct climate change and biodiversity implications. 
(i) Directions 
None arising directly from this report. 
(j) Consultations
In preparation of the unaudited Annual Accounts, consultations have
taken place between finance staff of both Moray Council and NHS
Grampian.  The Chief Officer and other key senior officers have been
consulted for comment where appropriate. 
6. CONCLUSION 
6.1 The Annual Accounts, subject to audit, show an overspend on the
provision of services of £0.536m for MIJB for the year ending 31 March
2025.  At the beginning of the year the MIJB, held in its reserves £1.986m. 
The closing balance on the reserves as at 31 March 2025 is £1.45m,
consisting wholly of reserves earmarked for specific purposes as detailed
in the unaudited annual accounts 2024/25. 
Author of Report: Deborah O’Shea, Chief Financial Officer
Background Papers:  with author
Ref: 
Page 125

Page 126

Page 126

Page 127

APPENDIX 1 
UNAUDITED ANNUAL ACCOUNTS
FOR THE YEAR ENDED 31 MARCH 2025 
Moray Integration Joint Board
Page 127

Page 128

Moray Integration Joint Board Annual Accounts 2024/25 
If you need information from the Moray Council in a
different language or format, such as Braille, audio tape
or large print, please contact: 
ياروم سلجم لᘘق نم تامولعم ᣠإ ةجاح ᢝᡧᣚ متنك اذإ  نوكتو  ةغلᗷ
وأ ويدوأ ةناوطسأ ،يا ᢔᣂلا لثم فلتخم لᜓش ᣢعوأ ةفلتخم  نوكت نأ
مط ب لاصّتﻹا ءاجّرلاف ةظᘭلغ فورح لامعتساᗷ ةعوب 
Jei pageidaujate tarnybos Moray tarybos teikiamą informaciją gauti kitokiu
formatu, pvz., Brailio raštu, garso įrašu ar stambiu šriftu, kreipkitės: 
Jeśli potrzebują Państwo informacji od Rady Okręgu Moray w innym
formacie, takim jak alfabet Braille'a, kasety audio lub druk dużą czcionką,
prosimy o kontakt: 
Se necessitar de receber informações por parte do Concelho de Moray
num formato diferente, como Braille, cassete áudio ou letras grandes,
contacte: 
Ja Jums vajadzīga informācija no Marejas domes (Moray Council) citā
valodā vai formātā, piemēram, Braila rakstā, audio lentā vai lielā drukā,
sazinieties ar: 
اي نابز رگيد یسک ےس لسنوک ےروم وک پآرگاتروص    راکرد تامولعم ںيم
ﻼثم ںوہ ˝    ،فورح ےڑب اي پيٹ ويڈآ ،ےليربںيئامرف ہطبار رک امرف ینابرہم وت: 
Chief Finance Officer to the Moray Integration Joint
Board, High Street, Elgin, IV30 1BX 
accountancy.support@moray.gov.uk 
Page 128

Page 129

Moray Integration Joint Board Annual Accounts 2024/25 
Table of Contents 
MORAY INTEGRATION JOINT BOARD MEMBERS 2024/25 .............................................. 1
MANAGEMENT COMMENTARY .......................................................................................... 2
STATEMENT OF RESPONSIBILITIES ............................................................................... 27
REMUNERATION REPORT ............................................................................................... 29
ANNUAL GOVERNANCE STATEMENT ............................................................................. 33
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT ..................................... 44
MOVEMENT IN RESERVES STATEMENT ........................................................................ 45
BALANCE SHEET .............................................................................................................. 46
NOTES TO THE FINANCIAL STATEMENTS ..................................................................... 47
Note 1 Significant Accounting Policies ............................................................................. 47
Note 2 Critical Judgements and Estimation Uncertainty .................................................. 48
Note 3 Events after the Reporting Period ........................................................................ 49
Note 4 Expenditure and Income Analysis by Nature ........................................................ 49
Note 5 Taxation and Non-Specific Grant Income ............................................................. 50
Note 6 Debtors ................................................................................................................ 50
Note 7 Usable Reserve: General Fund ............................................................................ 51
Note 8 Agency Income and Expenditure .......................................................................... 52
Note 9 Related Party Transactions .................................................................................. 53
Note 10 VAT .................................................................................................................... 55
Note 11 Accounting Standards That Have Been Issued but Have Yet To Be Adopted .... 55   
Page 129

Page 130

Moray Integration Joint Board Annual Accounts 2024/25 1 
MORAY INTEGRATION JOINT BOARD MEMBERS 2024/25 
Voting Members      
Dennis Robertson (Vice Chair)  Grampian Health Board
Tracy Colyer (Chair)   Moray Council (Resigned 26/09/2024)
Elaine Kirby (Chair)    Moray Council (Joined 21/11/2024)
Sandy Riddell    Grampian Health Board
Derick Murray    Grampian Health Board
Alex Stephen Grampian Health Board (Joined 1/7/2024)
Cllr. Peter Bloomfield   Moray Council
Cllr. Scott Lawrence    Moray Council 
Cllr Ben Williams    Moray Council
Non-Voting Members
Simon Bokor-Ingram   Chief Officer (left 31/5/2024)
Judith Proctor    Chief Officer (Joined 15/7/2024)
Jim Lyon Interim Chief Social Work Officer (Joined
3/6/2024)
Jane Ewen     Lead Nurse
Professor Duff Bruce   Non Primary Medical Service Lead
Dr Robert Lockhart    GP Lead
Dr Malcolm Simmons   GP Lead (left 31/3/2025)
Janette Topp Third Sector Stakeholder (19/4/2024 –
11/2/2025)
Sheila Brumby Service User Representative (Joined
19/4/2024)
Ivan Augustus    Carer Representative
Kevin Todd  Moray Council Staff Representative 
Elizabeth Robinson    Public Health Representative
Deirdre McIntyre                Grampian Health Board Staff Partnership 
Page 130

Page 131

Moray Integration Joint Board Annual Accounts 2024/25 2 
MORAY INTEGRATION JOINT BOARD MEMBERS 2023/24 Continued 
Co-opted Members
Sean Coady     Head of Service and Deputy Chief Officer
Deborah O’Shea Chief Finance Officer 
Adam Coldwells Interim Chief Executive Grampian Health
Board 
John Mundell  Interim Chief Executive, Moray Council
(3/6/2024 – 14/3/2025)
Karen Greaves Chief Executive, Moray Council (Joined
17/3/2025)
Sonya Duncan    Interim Corporate Manager
. 
MANAGEMENT COMMENTARY 
The Role and Remit of the Moray Integration Joint Board 
The Public Bodies (Joint Working) (Scotland) Act 2014 required that Moray Council
and Grampian Health Board prepared an Integration Scheme for the area of the local
authority detailing the governance arrangements for the integration of health and
social care services. This legislation resulted in the establishment of the Moray
Integration Joint Board (MIJB) that became operational from 1 April 2016. Moray
Council and Grampian Health Board, as the parties to the Integration Scheme, each
nominate voting members to the MIJB, currently, four elected members from Moray
Council and four Grampian Health Board members.   
Under the Public Bodies (Joint Working) (Scotland) Act 2014, a range of health and
social care functions have been delegated from Moray Council and Grampian Health
Board to the MIJB who has assumed responsibility for the planning and operational
oversight of delivery of integrated services.  MIJB also has a role to play in the strategic
planning of unscheduled acute hospital based services provided by Grampian Health
Board as part of the ‘set aside’ arrangements. 
Hosted services also form part of the MIJB budget. There are a number of services
which are hosted by one of the three IJB’s within Grampian Health Board area on
behalf of all the IJBs. Responsibilities include the planning and operational oversight
of delivery of services managed by one IJB on a day to day basis. MIJB has
responsibility for hosting services relating to Primary Care Contracts and the Grampian
Medical Emergency Department (GMED) Primary Care Out of Hours service. 
Page 131

Page 132

Moray Integration Joint Board Annual Accounts 2024/25 3 
MANAGEMENT COMMENTARY (continued) 
Key Purpose and Strategy 
Following review and consultation, the refreshed Strategic Plan (2022-2032) is a
continuation of the 2019 Strategic Plan. The current plan emphasises the strength of
integration and in addition to our two main Partners – Moray Council and Grampian
Health Board - the MIJB recognises the importance of the Third and Independent
Sectors and Unpaid Carers, in facilitating the successful operation of the partnership
of Health & Social Care Moray. As with all health and social care systems Moray is
facing increasing demand for services at the same time as resources – both funding
and workforce availability - are under pressure. These challenges will intensify in the
coming years as our population ages and more people with increasing complex needs
require support to meet their health and care needs. The MIJB sets the direction and
strategic intent through the development and implementation of the Strategic Plan and
seeks assurance on the management and delivery of services through Board level
performance reporting which ensures an appropriate level of scrutiny and challenge. 
The Strategic Plan identifies priority areas to support strategic direction and vision.   
STRATEGIC PLAN KEY THEMES 
BUILDING RESILIENCE – Taking greater responsibility for our health and
wellbeing
HOME FIRST – Being supported at home or in a homely setting as far as
possible
PARTNERS IN CARE – Supporting citizens to make choices and take
control of their care and support
WE ARE PARTNERS IN CARE
OUR VISION: “We come
together as equal and valued
partners in care to achieve the
best health and wellbeing
possible for everyone in Moray
throughout their lives.”
OUR VALUES: Dignity and
respect; person-led; care and
compassion; safe, effective and
responsive
OUTCOMES: Lives are healthier – People live more independently –
Experiences of services are positive – Quality of life is
maintained/improved – Health inequalities are reduced – Carers are
supported – People are safe – The workforce continually improves –
Resources are used effectively and efficiently
Page 132

Page 133

Moray Integration Joint Board Annual Accounts 2024/25 4 
MANAGEMENT COMMENTARY (continued) 
The Plan purposefully places an emphasis on prevention and early intervention
activities and seeks to prioritise these activities as a long term goal, actively pursuing
good health and wellbeing for the population, with increased investment in this area of
work.  It highlights the Home First approach and the rationale for this is to assist people
in understanding that “hospital is not always the best place for people”, a statement
frequently used and in particular if you are frail and elderly can be counter intuitive to
a successful recovery.     
Initiatives to transform services in response to high levels of demand continue. The
Moray Strategic Plan was refreshed in 2022 and along with the associated delivery
plan, which was updated in May 2025, highlights key priorities for transformation. 
Population 
Moray is a largely rural area covering a land mass of 2,238 sq. km. It has a long
coastline on the Moray Firth with harbours, fishing villages and world-class
beaches.  From the 2022 census, the area’s population is 93,4001, which is an
increase of 0.1% since 2011. The population growth in Moray is slowing and it is
projected that the population in Moray will start to decline by 2030. This trend is
forecast to continue. 
The main centre of population is Elgin, which is home to more than one quarter of the
people living in Moray. Other towns of population between 4,000 and 10,000 are
Forres, Buckie, Lossiemouth and Keith. 
The table below sets out projected population growth based on the 2022 baseline,
which has not changed from the 2018 publication. Across Scotland there is a projected
reduction in those in the 0-15 age group, limited change in the working age population,
but significant growth in adults of pensionable age. By comparison it is projected that
Moray will have a greater decrease in children, a marked decrease in those of a
working age, but a significantly higher change in those of a pensionable age2. 
1 Scotland's Census 2022 - Rounded population estimates - data | Scotland's Census
2 Population Projections for Scottish Areas 2018-based - National Records of Scotland (NRS)
-22.2%
-9.0%
30.8%
-10.5%
-0.2%
23.2%
-30.0%
-20.0%
-10.0%
0.0%
10.0%
20.0%
30.0%
40.0%
Children (0-15) Working Age Pensionable age
and overProjected change (%)
Age Group
Projected percentage change in population (2018-
2043) by age
Moray
Scotland
Page 133

Page 134

Moray Integration Joint Board Annual Accounts 2024/25 5 
MANAGEMENT COMMENTARY (continued) 
Performance Reporting 
Performance is reported quarterly to the Audit, Performance and Risk Committee of
the MIJB. In addition to the quarterly reporting, there is a requirement under the Public
Sector (Joint Working) (Scotland) Act 2014 for the MIJB to produce and publish an
Annual Performance Report setting out an assessment of performance in planning
and carrying out the delegated functions for which they are responsible. The Annual
Performance Report is due to be published by 31 July this year and will be published
on the Health & Social Care Moray website, once approved by the MIJB.   
One of the major aims of integration and a key measurable target for MIJB is to reduce
the number of Moray residents that are ready to be sent home from hospital but have
been delayed in this process. This is referred to as a ‘delayed discharge’. Delayed
discharge can occur due to many reasons but quite often involves the onward
provision of social care which can be complex in nature and/or finite in its availability.
Figures 1 and 2, below, notes Moray’s performance over a six-year period showing
the number of delayed discharge bed days occupied varying significantly and with
minimal seasonal pattern up to March 2025. 
Delayed discharges reduced during the COVID pandemic and the lock down periods,
as people stayed in their own homes as per advice at the time and there was more
availability of family members to support care needs. Notably, delayed discharges
began to rise in Moray and across the country in March 2022 and work commenced
across the three partnerships in Grampian to address the issue. Results in this activity
can be seen from March 2023 onwards. However, winter 2023 saw delayed
discharges increasing, in Moray and across the country and continues at an increased
level. 
Figure 1 
Page 134

Page 135

Moray Integration Joint Board Annual Accounts 2024/25 6 
MANAGEMENT COMMENTARY (continued) 
Figure 2 
There continues to be a focus on ensuring people are getting home quickly and can
maintain their independence.  In figures 3 and 4, below, the rate of emergency
occupied bed days for over 65 years of age per 1000 population has increased since
2021/22 with a slow decrease since March 2023. 
With an ageing population the number of people delayed at any one time could
increase again unless viable, sustainable alternative community provision is
developed. Presentations to hospital from an older population have more acuity and
complexity, exacerbating the issue of delays. The Scottish Government have now set
targets for delayed discharges per 100,000 and for Moray the target is 26.  This
presents a challenge, but efforts continue to review and streamline processes and
improve flow across the system. 
The importance of integration across the system is key to making progress, and over
the year teams have enhanced communication and decision making as a Moray
system. There has been further redesign of pathways and dedicated resource
assigned to supporting critical decision making in social care. This has all supported
the steady progress that is evident from the national comparisons of Moray’s
performance 
0
200
400
600
800
1000
1200
1400
1600
Jun Sep Dec Mar
Number of bed days occupied by delayed discharges
18+ at census date
2020/21 2021/22 2022/23 2023/24 2024/25
Page 135

Page 136

Moray Integration Joint Board Annual Accounts 2024/25 7 
MANAGEMENT COMMENTARY (continued) 
Figure 3 
Figure 4 
1500
1700
1900
2100
2300
2500
2700
2900
Jun Sep Dec Mar
Rate of Emergency Occupied Bed Days for over 65s per
1000 population
2020/21 2021/22 2022/23 2023/24 2024/25
Page 136

Page 137

Moray Integration Joint Board Annual Accounts 2024/25 8 
MANAGEMENT COMMENTARY (continued) 
Moray Integration Joint Board (MIJB) 
The MIJB has scrutinised and directed the delivery of services in line with the
Integration Scheme and Strategic Plan while recognising that the cost base has to
change as the level of available budget in real terms is reducing. Both funding
partners (Moray Council and NHS Grampian) have significant savings to achieve,
and against this backdrop the MIJB directed a series of workshops during the year to
support officers in their work. The focus has continued to be on achieving the highest
quality and safety possible within a diminished budget, while being most efficient,
and achieving the best possible outcomes for our residents. The Strategic Plan
aspires to increasing spend on preventative work, “upstream” to tackle issues earlier,
preventing crises where possible and reducing demand. However, a key challenge
going forwards will be to continue that focus at a time when budgets are under so
much pressure and people are presenting with increasingly complex needs. 
.
Performance
The MIJB, its committees and the Health and Social Care Partnership Senior
Management Team receive regular assurance reports and updates on how the
Strategic Plan commitments are being progressed through work streams and
individual service plans, as well as detailed financial and performance updates. 
The strategic risk register was reviewed by the Moray Integration Joint Board and
Senior Management Team. It was approved in May 2025 and will form part of a
robust risk monitoring framework in order to identify, assess and prioritise risks
related to the delivery of services, particularly any which are likely to affect the
delivery of the Strategic Plan. 
The inherent risks being faced by the MIJB, together with a current assessment on
the level of the risks and mitigating actions being taken to reduce the impact of the
risks, is reported to biannually to the Audit Performance and Risk Committee for
oversight and assurance.   
Management teams and the Care and Clinical Governance Group review and
respond to any reports produced by Audit Scotland, Healthcare Improvement
Scotland, the Care Inspectorate, and the Mental Welfare Commission for Scotland. 
Quarterly performance reports are produced for Health and Social Care Moray
(HSCM) management to review performance and to determine actions required to
address areas for concern or to highlight areas showing improvement.  This
information is further scrutinised by the Senior Management team and then reported
to the MIJB’s Audit, Performance and Risk Committee. 
There are many initiatives and ongoing projects being undertaken by HSCM that are
seeking to reduce the delays in hospitals and to meet unmet needs.  For example,
ensuring the provision of care at home is maximised within available budget is a key
aspect of the Strategic Care at Home workstream.   
Page 137

Page 138

Moray Integration Joint Board Annual Accounts 2024/25 9 
MANAGEMENT COMMENTARY (continued) 
Research into the type of equipment, benefits and impacts is being undertaken by the
Digital Health Institute as part of the Growth Deal which will inform our Technology
Enabled Care and Digital 
strategy which will provide other options for supporting people to live independently in
their own homes.  The collaborative initiative Discharge Without Delays being
undertaken by partners across NHS Grampian, is aiming to reduce delays currently
experienced by people who are medically fit to return home and is being facilitated by
Health Intelligence Scotland.  Whole system outcomes have been determined which
will be incorporated into the revised performance report to this committee for 2025/26 
The integration of Children & families and Justice services into Health & Social Care
Moray under the direction of the MIJB is not yet reflected in the Board’s Strategic
Plan. Work in ongoing to ensure appropriate governance of performance reporting
so that it can be included in future MIJB Annual Performance Reports. 
Strategy and Plans
The MIJB is required to review its Strategic Plan every three years as per the
legislation. The Strategic Plan 2022-2032 places an emphasis on prevention and
early intervention with the aim of building resilience for individuals and communities.
The Plan identified key aims of the MIJB and directed HSCM to work closely with
communities and key partners to reform the system of health and social care in
Moray. It was also recognised that progress has been made against the three
strategic themes and the review of the Plan focused on what already has been
achieved the long-term strategic objectives make room for adapting to challenges
and developments in health and social care over the coming years. 
The current Strategic Plan  sets out the following vision and priorities for health and
social care services in Moray.    
Health and Social Care Moray’s strategic plan sets out the 3 key themes and the
objectives; 
 Building Resilience – supporting people to take greater responsibility for
their health and wellbeing.
 Home First – supporting people at home or in a homely setting as far as
possible. 
 Partners in Care – supporting citizens to make choices and take control of
their care and support. 
Page 138

Page 139

Moray Integration Joint Board Annual Accounts 2024/25 10 
MANAGEMENT COMMENTARY (continued) 
Staff Wellbeing 
Health & Social Care Moray’s Health Improvement Team has achieved the Paths for
All Walk at Work Award for its innovative efforts to promote physical activity in the
workplace and encourage colleagues to boost their health and wellbeing through
daily walking. 
Morgan McKay, Health Walk Coordinator, led the team in developing initiatives to get
colleagues moving more. She carried out a travel survey to identify how staff travel
to and from work and used the data to develop a plan to increase workplace activity. 
The team mapped convenient walking routes from two key work locations in Elgin –
the Moray Council Annexe and Dr Gray's Hospital – offering both 30-minute and 15-
minute options. To encourage staff to keep walking no matter the weather, Morgan
arranged for umbrellas to be available for borrowing and designated areas for drying
wet outdoor gear. 
Staff engagement was further boosted through
participation in the Paths for All step count challenge, a
twice-yearly walking initiative that connects Scottish
workplaces in friendly competition. 
The Walk Moray project supports a network of trained
volunteers to deliver a variety of weekly low-level,
accessible and friendly health walks in communities across
Moray which are a great way to increase your activity
levels. 
Promoting Health and Wellbeing 
Health & Social Care Moray (HSCM) teamed up with community partners to highlight
the importance of eating well and staying hydrated during Nutrition and Hydration
Week. The national campaign aims to highlight how proper food and drink intake plays
a vital role in overall health, particularly for people in care settings such as hospitals
and care homes. Malnutrition and dehydration are often overlooked but can have
serious consequences, leading to hospital admissions, longer hospital stays, delayed
recovery, and a decline in overall wellbeing. 
HSCM is tackling this issue head-on with an exciting lineup of activities designed to
educate, engage, and inspire action by colleagues and the wider public. Throughout
the week, HSCM’s Health Improvement Team has been helping local partners host a
variety of activities including information stands; launch of new food and drink
initiatives; daily themed food days; poster displays; themed drinks trollies; and tea
parties 
Page 139

Page 140

Moray Integration Joint Board Annual Accounts 2024/25 11 
MANAGEMENT COMMENTARY (continued) 
Service Delivery/Business as Usual
HSCM continues to invest in the delivery of high-quality services through
commissioning activity across mental health, advocacy, and primary care.
Following a competitive procurement process, Scottish mental health charity SAMH
(Scottish Action for Mental Health) has been awarded contracts to deliver adult
mental health community support services in Moray until 2029. SAMH will provide
two key services: an intensive recovery service for individuals with higher-level
mental health needs, and a new community support service, which includes delivery
of the Distress Brief Intervention (DBI) programme.
The intensive recovery service will continue to support people receiving care from
hospital or community mental health teams, offering enhanced, community-based
outreach to promote recovery and independent living. The new community support
service will provide short-term, practical assistance to help individuals access
appropriate support and tackle factors affecting their mental wellbeing. DBI will offer
a rapid response to individuals in emotional distress, particularly those presenting to
emergency or crisis services
As part of ongoing efforts to support people to have their voices heard, HSCM has
commissioned VoiceAbility as its new independent advocacy service provider.
Launched in October 2024, this free and confidential service is available to adults
accessing social care services in Moray, including those with mental health
conditions, learning disabilities, autism, dementia, physical and sensory disabilities,
as well as unpaid carers. VoiceAbility's trained advocates support individuals to
understand their rights, express their views, and take an active role in decisions
affecting their health and wellbeing. 
A new contract has also been awarded to secure the future of GP services in
Aberlour Medical Practice, with Speyside Medical Group appointed as the new
provider from April 2025. The experienced partnership of eight GPs currently
operates Grantown-on-Spey and Glenlivet Medical Practices and will bring its
expertise to serve the 3,000 patients in Aberlour. The practice had been under
interim management by HSCM and NHS Grampian since February 2024, following
the withdrawal of the previous sole GP contractor. 
Page 140

Page 141

Moray Integration Joint Board Annual Accounts 2024/25 12 
MANAGEMENT COMMENTARY (continued) 
The aim of a Community Appointment Day (CAD) is to create the right conditions to
allow clinicians to support people with their condition and beyond, lean into the local
community services, embed personalised care and focus on prevention.  With the
intention of addressing increasing waiting lists by trialling a new model of care, NHS
Grampian delivered their first CAD in Moray for MSK Physiotherapy and Podiatry
patients. This was a new way of working, moving away from treatment led health and
delivering services differently by strengthening local partnerships, particularly with
communities, to enhance both patient and practitioner experience.  There were 210
patients on the waiting list who were all invited, with 162 opted to attend and 120
attending on the day. Patients were linked their own online Personal Health
Passport, which was completed by them as they moved around the zones. Patients
received a one-to-one consultation with the appropriate clinician and were
encouraged to have meaningful conversations about what matters most to them.   
The CAD followed Realistic medicine principles,
focusing on personalised and values-based
care.  The voice of lived experience was heard
throughout the planning process by involving the
local Versus Arthritis Chronic Pain Group who
offered valuable feedback and guidance.   
19 community groups and partner services were in
attendance to provide information about the support
available within the local community.  Bringing
health and community organisations together under
one roof, allowed people’s health and wellbeing to
be viewed in full totality 
Preliminary Feedback was largely positive, indicating that patients felt the day had
been ‘enlightening’, benefited greatly from having services available in one place and
found out about what is available in communities  
Page 141

Page 142

Moray Integration Joint Board Annual Accounts 2024/25 13 
MANAGEMENT COMMENTARY (continued) 
Longer Term Changes to Strategies and Plans
Moray Community Justice Partnership
The Moray Community Justice Partnership has formally launched its new
improvement plan, which will bring together local agencies and communities to
strengthen efforts to make Moray a safer place to live and
work. 
The five-year plan focuses on rehabilitation and public safety.
It builds on existing work to reduce reoffending and minimise
the number of victims by offering individuals who have
offended support to make positive life changes. 
The local priorities for improving justice outcomes were
identified through engagement with community justice
stakeholders and residents, and a strategic assessment of
Moray's strengths and needs 
By 2029, the Moray Community Justice Partnership aims to: 
 Strengthen engagement with communities to reduce stigma, increase
understanding and support for community justice, and embed lived
experience within its work;
 Improve access to support for individuals leaving prison to aid reintegration;
 Expand access to employability skills and employment opportunities for those
with convictions;
 Enhance support for individuals in police custody;
 Develop more community-based restorative justice options.
Significant progress in reducing drug and alcohol-related harms and improving lives
across communities has been achieved through the work of the Moray Alcohol and
Drug Partnership (ADP). 
Moray ADP has made notable progress in implementing the national Medication
Assisted Treatment (MAT) standards, which are a key part of Scotland’s response to
the ongoing drug related deaths crisis. The standards provide a framework ensuring
treatment is safe, person-centred and effective. 
Improved referral pathways, delivered through a third sector direct access service,
have reduced waiting times for people and enabled faster access to support.
Feedback from lived experience groups has shaped pathways into and through 
Page 142

Page 143

Moray Integration Joint Board Annual Accounts 2024/25 14 
MANAGEMENT COMMENTARY (continued) 
services to better reflect the realities of people’s lives, leading to improved outcomes,
while frontline staff have benefitted from continued training on rights awareness,
trauma informed practice and crisis response.
Strategic Delivery Plan
A revised Strategic Delivery Plan for 2025 to 2028 was approved in draft by MIJB in
March 2025 and final version in May 2025.  This plan incorporates the developments
required to enhance our ability to meet predicted future demands for services, whilst
undertaking reviews of existing models of care to ensure that the services provided
are sustainable and fit for purpose.  There are also projects to implement more efficient
ways of working, to aid in meeting the financial challenge that is impacting on all public
sector organisations.  A robust governance framework will be essential to ensure that
projects can be delivered within available resources and have a clear focus on
outcomes
Joint Inspection
Moray's multi-agency Public Protection Partnership
has evidenced substantial improvement in
supporting and protecting adults at risk of harm   
The positive impact achieved by local authority,
health and police colleagues in their work to keep
people safe, has been acknowledged with publication in October 2024 of the Joint
Inspection of Adult Support and Protection in Moray. The progress review by the
Care Inspectorate and its scrutiny partners was a follow-up to a joint inspection
carried out in 2022. On their return, inspectors found significant progress had been
achieved across all seven priority areas identified for improvement. 
Mental Health Strategic Delivery Plan
The Moray Mental Health and Wellbeing Delivery Plan 2024-2026 was approved by
the MIJB in September 2024 and was updated in May 2025, which underpins the
work required to progress the Moray Mental Health and Wellbeing Strategy 2016-
2026. Scotland is currently facing a growing mental health crisis, with challenges
including rising demand for services, increased complexity of cases, and persistent
inequalities in access and support. While there is a focus on developing and
expanding services, significant workforce challenges, and funding shortfalls continue
to hinder progress. Many of these challenges are amplified in Moray due to the rural
nature of many of our communities, difficulties in the recruitment and retention of
staff, and access to specialist tertiary services 
Page 143

Page 144

Moray Integration Joint Board Annual Accounts 2024/25 15 
MANAGEMENT COMMENTARY (continued) 
The Moray Adult Mental Health and Wellbeing Strategic group aim to ensure that the
collective voice of lived and living experience influences the way that we design
services and responses to address the challenges facing individuals and families
affected by mental health in Moray. The group work closely with Moray Wellbeing
Hub, Making Recovery Real Partnership and tsiMoray to achieve this; for example,
the involvement of lived experience in service development, commissioning,
implementation and evaluation of the recently commissioned SAMH projects 
The alignment of Children’s Services and Adults Services mental health strategic
planning and delivery is essential. Within Moray there is currently a Children’s Mental
Health and Wellbeing Partnership and there is the Moray Mental Health and
Wellbeing Strategic Group. There is a degree of cross representation between both
groups to ensure shared planning however, there remains the medium term vision
for there to be a single strategic group for children and adult mental health services
in Moray 
Financial Review and Performance 
Financial performance forms part of the regular reporting cycle to the MIJB. 
Throughout the year the Board, through the reports it receives, is asked to consider
the financial position at a given point and any management action deemed as
necessary to ensure delivery of services within the designated financial framework. 
From the first quarter in the financial year, the Board was presented with financial
information that included a forecast position to the end of the year. In November 2024
the Board received a financial report which forecast an expected overspend to the end
of the financial year of £5.58m. This forecast remained consistent throughout the
remainder of the year and in January 2025, MIJB were forecasting an overspend to
the end of the year of £5.51m, the MIJB actually out turned at £4.26m overspent. Both
partners in line with the Integration Scheme, put in additional funding to cover this
overspend, so with the use of ear marked reserves totalling £0.536m, this leaves a
balance of £1.45m in ear marked reserves to be carried forward into 2025/26. In May
2024, the MIJB agreed a savings plan of £8.297m, with a mixture of recurring savings
and recurring reductions in spend.  At the end of the financial year, this had been
achieved in part, with recurring savings of £2.302m and £2,331m reduction in
overspend. 
Given the uncertainties associated with funding and the emerging overspend position
at the early stage of the financial year, it was necessary to update the Board regularly
on the emerging financial position. This was done formally through MIJB meetings and
informally through development sessions. 
Page 144

Page 145

Moray Integration Joint Board Annual Accounts 2024/25 16 
MANAGEMENT COMMENTARY (continued) 
Service Area Budget
£000’s
Actual
£000’s
Variance
(Over)/ under
spend £000’s
Note
Community Hospitals & Services 7,700 8,328 (628) 
Community Nursing104,360 5,979 6,166 (187) 
Learning Disabilities 17,702 19,975 (2,273) 1
Mental Health 12,140 12,055 85 
Addictions 1,907 1,763 144 
Adult Protection & Health Improvement 249 273 (24) 
Care Services Provided In-House 24,743 22,754 1,989 2
Older People Services & Physical &
Sensory Disability 24,775 27,034 (2,259) 3
Intermediate Care & OT 1,771 1,972 (201) 
Care Services Provided by External
Contractors 1,835 1,816 19 
Other Community Services 10,383 10,280 103 
Administration & Management 3,333 3,152 181 
Other Operational Services 1,377 1,535 (158) 
Primary Care Prescribing 18,748 21,937 (3,189) 4
Primary Care Services 21,427 21,331 96 
Hosted Services 5,713 5,665 48 
Out of Area Placements 720 1,971 (1,251) 5
Improvement Grants 1,207 1,021 186 
Children’s & Justice Services 19,523 19,625 (102) 
Total Core Services 181,235 188,656 (7,421) 
Strategic Funds & Other Resources 14,891 6,020 8,871 
TOTALS (before set aside) 196,126 194,676 1,450 
Set Aside 15,639 15,639 - 
TOTAL 211,765 210,315 1,450 
The table above summarises the financial performance of the MIJB by comparing
budget against actual performance for the year.  
Page 145

Page 146

Moray Integration Joint Board Annual Accounts 2024/25 17 
MANAGEMENT COMMENTARY (continued) 
Significant variances against the budget were notably: 
Note 1 Learning Disabilities (LD) – The LD service is overspent by £2,272,694 at
the year-end. The overspend is essentially due to the purchase of care for people with
complex needs which resulted in an overspend of £2,806,801 and client transport of
£13,781. This is offset by more income received than expected of £524,800 (income
due from another authority and Change Fund funds from NHS) and other small
underspends of £18,619 which primarily relate to property costs. There was a minor
underspend of £4,469 in other Learning Disabilities clinical services. This budget has
been under pressure for a number of years due to demographic pressures, transitions
from Children’s services and people living longer and getting frailer whilst staying at
home. The biggest overspends was for services provided to individuals in their own
homes to support their daily living needs which enables people to stay living at home
or in a homely setting for as long as possible and day care which provides activities
during the day in the community. 
Note 2 Care Services Provided In-House – This budget is underspent by £1,988,757
at the end of the year. This relates to underspend in staffing across all the services in
this budget totalling £2,291,755 and other minor underspends of £8,275 which is being
reduced by overspends relating to transport costs £97,970; insurance costs £29,047,
utility costs £62,430 and less income than expected £121,826. Unfilled vacancies have
been the main reason for the underspend throughout the year, and the issue of
recruitment has been an ongoing problem 
Note 3 Older People Services and Physical & Sensory Disability - This budget is
overspent by £2,259,056 at the end of the year. This primarily relates to overspends
for home care in the area teams £539,818, permanent care £1,766,157 due to the
increase in the number of clients receiving nursing care rather than residential care
and respite care £105,776 this is being reduced by an underspend for day care
£152,695. The variances within this overall budget heading reflect the shift in the
balance of care to enable people to remain in their homes for longer. The ageing
population requiring more complex care and local demographics also contributes to
this overspend as well as the correlation between the recruitment and retention of the
internal home care service provision. 
Note 4 Primary Care Prescribing - The primary care prescribing budget is reporting
an over spend of £3,189,386 for the twelve months to 31 March 2025. The overall
average price has remained relatively consistent and includes cost reduction savings
identified by Pharmacy implemented countered by the impact of short supply causing
an increase in costs. This is spread across a range of products and is ongoing. This
overall volume increase at 3.5% is less than previously anticipated. 
Note 5 Out of Area Placements – This budget is overspent by £1,250,899 at the year
end. This is due to the continuing number of high cost individual specialised NHS
placements. 
Page 146

Page 147

Moray Integration Joint Board Annual Accounts 2024/25 18 
MANAGEMENT COMMENTARY (continued) 
MIJB’s financial performance is presented in the comprehensive income and
expenditure statement (CIES), which can be seen on page 44.  At 31 March 2025
there were ear marked reserves of £1.451m available to the MIJB, compared to
£1.986m at 31 March 2024. These remaining reserves of £1.451m are for various
purposes as described below: 
Earmarked Reserves Amount £000’s
GP Premises 39
National Drugs MAT 250
OOH Winter Pressure funding 172
Moray Cervical screening 35
Moray hospital at home 5
Moray Psychological 315
MHO Funding 138
Adult protection funding for CA 18
Adult Disability payment 45
National Trauma Training services 62
Moray School Nurse 32
Moray Winter Fund HCSW & MDT 182
LD Annual Health Checks 69
Community Planning partnership 2
Moray District Nurses 56
OOH Dev Fellowship scheme 30
Total Earmarked 1,450  
General Reserves 0  
TOTAL Earmarked & General  1,450 
GP Premises – balance of funding for improvement grants including the making of
premises improvement grants to GP contractors. The continued digitalisation of paper
GP records. Modifications for the purposes of improving ventilation and increase to
the space available in NHS owned or leased premises for primary care multi-
disciplinary teams. 
Page 147

Page 148

Moray Integration Joint Board Annual Accounts 2024/25 19 
MANAGEMENT COMMENTARY (continued) 
National Drugs Medication Assisted Treatment (MAT) for embedding and
implementation of the standards will he be overseen by the MAT implementation
support team (MIST). 
National Drugs Mission Moray – balance of funding for range of activities including:
drug deaths, taskforce funding, priorities of national mission, residential rehabilitation,
whole family approach, outreach, bear fatal overdose pathways and lived and living
experience. 
Out of Hours Winter Pressure funding – balance of funding to sustain GO out of hours
and to support resilience to explore operational solutions. 
Moray Cervical Screening – balance of funding for smear test catch up campaign. 
Moray Hospital at home – development of Hospital at Home provides Acute hospital
level care delivered by healthcare professionals, in a home context for a condition that
would otherwise require acute hospital inpatient care. 
Moray Psychological – funding streams for mental health, psychological wellbeing,
facilities, post diagnostic support and psychological therapies. 
Mental Health Officer (MHO) funding – funding to support additional mental health
officer capacity. 
Adult protection funding for care at home– balance of funding to build capacity in care
at home community based services. 
Adult Disability payment – funding to assist with the implementation of the adult
disability payments. 
National Trauma Training services – training for dealing with people affected by
trauma and adversity. 
Moray School nurse – funding to support NHS Grampian to retain school nurse posts. 
Moray Winter Fund Health Care Social Workers (HCSW) – additional funding for
further HCSW in both the IJB and Emergency department. 
Moray Winter fund Multi Disciplinary Team – additional funding for service pressures
includes Discharge to Assess, Home First Frailty team and volunteer development.  
Learning Disability Annual Health Checks – to implement the annual health checks. 
Community Planning Partnership – funding towards community planning partnership. 
Moray District Nurses – allocation to support recruitment and training of District
Nurses. 
Page 148

Page 149

Moray Integration Joint Board Annual Accounts 2024/25 20 
MANAGEMENT COMMENTARY (continued) 
Out of Hours (OOH) Development Fellowship Scheme – scheme to keep GPs within
clinical practice, increase GP’s confidence and competence in OOHs work 
All reserves are expected to be utilised for their intended purpose during 2025/26. 
Set Aside – Excluded from the financial performance table above on page 16 but
included within the Comprehensive Income & Expenditure Account is £15.639m for
Set Aside services.  Set Aside is an amount representing resource consumption for
large hospital services that are managed on a day to day basis by the NHS
Grampian.  MIJB has a responsibility for the strategic planning of these services in
partnership with the Acute Sector.
Set Aside services include:
 Accident and emergency services at Aberdeen Royal Infirmary and Dr Gray’s
inpatient and outpatient departments;
 Inpatient hospital services relating to general medicine, geriatric medicine,
rehabilitation medicine, respiratory medicine, learning disabilities, old age
psychiatry and general psychiatry; and
 Palliative care services provided at Roxburgh House Aberdeen and The Oaks
Elgin. 
The budget allocated to Moray is designed to represent the consumption of these
services by the Moray population. 
The figures for 2024/25 have been derived by uplifting 2019/20 figures by baseline
funding uplift in 2020/21 (3.00%), 2021/22 (3.36%) ,2022/23 (6.70%), and 2023/24
(5.35%) and 2024/25 (6.64%): 
2024/25 2023/24 2022/23 2021/22 2020/21
Budget 15.639m 14.665m 13.92m 13.04m 12.62m 
Page 149

Page 150

Moray Integration Joint Board Annual Accounts 2024/25 21 
MANAGEMENT COMMENTARY (continued) 
Risks, Uncertainties and Future Developments
The MIJB Chief Officer has a responsibility to maintain a risk strategy and risk reporting
framework.  Risks inherent within the MIJB are monitored, managed and reported at
Audit, Performance and Risk Committee.  In addition, a risk action log is monitored
and managed by the Senior Management Team.   
The key strategic risks of the MIJB classed as ‘High’ and ‘Very High’ are presented
below, the risk number relates to the MIJB internal risk numbering: 
VERY HIGH
Risk 2 - The MIJB must operate within the resources allocated to it by the partner
bodies and it is good financial practice to set a balanced budget at the start of each
financial year. There is a risk that financial pressures being experienced by the
funding partners will directly impact the MIJB’s strategic planning of services and its
decision-making. 
Managing the risk – current controls in place – 
1. Medium Term Financial Framework (MTFF) approved by MIJB on 27 March
2025.
2. Additional resource to support services a Programme Management Office
agreed until September 2025.
3. Tri-partite partnership performance meetings with partner CEOs, Finance
Directors and Chair/Vice Chair of MIJB.
4. Operational financial monitoring undertaken by Chief Finance Officer
(CFO), Heads of Service (HOS) and Budget Managers.
5. Budget Savings Oversight Group chaired by Chief Officer, attended by
HOS, CFO and Service Managers as appropriate.
6. Review of MIJB Strategic Delivery Plan ensuring all projects are aligned with
savings plans. 
Assurances: 
Quarterly Budget monitoring reporting to APR and MIJB.
Financial Reporting through MIJB, NHS Grampian and Moray Council.
The Project Management Office will support the Financial Recovery Savings
presented as part of the budget setting for 2025/26.
Financial Development Sessions with MIJB members.
Internal Audit quarterly reporting to APR. 
External Audits presented to MIJB/ Committees as appropriate.
Six weekly Tri-partite partnership performance meetings with partner CEOs,
Finance Directors and regular meetings with the Chair/Vice Chair of MIJB. 
Page 150

Page 151

Moray Integration Joint Board Annual Accounts 2024/25 22 
MANAGEMENT COMMENTARY (continued) 
HIGH
Risk 3 - There is a risk that the MIJB’s workforce strategy is not delivered impacting
the quality of paid and unpaid Health & Social Care. 
Managing the risk – Current controls in place   
1. Management structure currently under review.
2. Moray Council are aware of the housing issues and are conducting an
assessment of needs, including people working in the Health and Care sector.
3. Staff wellbeing is a key focus and there are many initiatives across both parent
organisations offering information, support and access to activities.
4. Collaborative approaches with educational institutions e.g. intakes and
programmes for future workforce development.
5. Professional Development and retention programmes; Incentives have been
secured to attract additional NHS dentists and dental practices to Moray. The
Scottish Dental Access Initiative includes Moray, with grants of £50,000 and
above available to allow dental practices to be established or extended–
provided there is a seven-year commitment to providing NHS treatment. A
recruitment and retention bonus is also being offered to eligible new dentists in
Moray
6. GP sustainability Group and Primary Care Vison for the Future Groups now
progressing across Grampian.
7. iMatter reports are used to develop actions plans for teams.
Assurances:
Operational oversight by Moray Workforce Forum.
The HSCM Response Group continues to focus on leadership around emerging
issues and resolving them, including staffing. 
Risk  5 - There is a risk that the MIJB does not comply with the necessary legislative
and regulatory requirements in which it operates. 
Managing the risk – Current controls in place: 
1. NHS Grampian Resilience Standards Action Plan approved (3 year). New
standards are being drafted by Scottish Government, and these are expected
in 2025 and will replace the current standards.
2. Continuous emergency preparedness awareness with partners under GLRP
– including exercises and debriefs.
3. Learning from Inspection Reports, Adverse Events, Complaints – action
plans and performance measures monitored by OMT with oversight by SMT.
4. HSCM Civil Contingencies group review specific risks and action plans to
mitigate, developing plans and testing arrangements in partnership with
NHSG and Council.
5. Annual review of internal resilience and emergency processes with Senior
Managers on Call.
Page 151

Page 152

Moray Integration Joint Board Annual Accounts 2024/25 23 
MANAGEMENT COMMENTARY (continued) 
HIGH (continued)
Assurances:
Quarterly reporting to Clinical and Care Governance and Audit, Performance and
Risk Committees.
Annual Performance Report – published September 2024.
Chief Social Work Officers Report.
Internal and External Audits.
Senior Management Meetings fortnightly.
Joint meeting of MIJB Chief Officer with two Partner Body Chief Executives.
Annual report on MIJB activity developed and reported to Moray Council and
NHSG 
Risk 6 - There is a risk that the MIJB’s strategic aspirations are not transformative
and as a result, we are unable to deliver outcomes for people in a sustainable way. 
Managing the risk – Current controls in place: 
1. Clinical and Care Governance (CCG) Committee. Clinical Risk Management and
Practice Governance group has oversight of their respective professional
standards and links into Clinical and Care Governance Group, which escalates
to CCG Committee as necessary.
2. High and Very High operational health service risks are reviewed by HSCM
Clinical Risk Management (CRM) Group and also NHS Grampian CRM Group.
3. Annual Performance Reports.
4. Internal and External Audit.
5. Internal/External Inspection reports are scrutinised by appropriate operational
groups and by exception to SLT for subsequent reporting to CCG or APR
Committee as appropriate. 
6. Care Home Collaborative Support Group meets to oversee and manage risks in
care homes.
7. Children and Adult Protection services report to their respective committees.
Governance Structure and Process (Senior Leadership Team meetings,
Operational Team Meetings, Daily Huddles). 
Assurances:
Audit, Performance and Risk and Clinical and Care Governance Sub-Committees
oversight and scrutiny.
The Clinical and Care Governance Framework was refreshed and presented to
CCG Committee in November 2023 
Page 152

Page 153

Moray Integration Joint Board Annual Accounts 2024/25 24 
MANAGEMENT COMMENTARY (continued) 
HIGH (continued) 
Risk 7 - There is a risk that the MIJB is unable to exert influence on services
delegated but hosted within another organisation. 
Managing the risk – Current controls in place: 
1. Chief Officer regularly meets with Chief Officers of Aberdeen City Health and
Social Care Partnership and Aberdeenshire Health and Social Care
Partnership.
2. Significant changes to service delivery are discussed across all three HSCP’s.
3. Agreement that proposals regard significant service changes are presented to
all three MIJB’s for approval.
4. Internal Audit of MIJB Hosted Services. 
Assurances:
These largely come from the systems, process and procedures put in place by
NHS Grampian, which are still being operated, along with any new processes
which are put in place by the lead MIJB. 
North East System Wide Transformation Group (Officers only) led by the 4 pan-
Grampian chief executives. The aim of the group is to develop real top-level
leadership to drive forward the change agenda, especially relating to the delegated
hospital-based services.
Both the CEO group and the Chairs & Vice Chairs group meet quarterly. The
meetings are evenly staggered between groups, giving some six weeks between
them, allowing progressive work / iterative work to be timely between the forums. 
The Portfolio approach and wider system approach demonstrates closer joint
working across the three Health and Social Care Partnerships and the Acute Sector. 
Development Aims for 2025/26 
Discharge without Delay & Frailty at the Front Door 
Health and Social Care Moray is taking part, supported by the MIJB, in the National
Collaborative to support Discharge without Delay.  This approach supports us in
undertaking mapping and self-assessment work and understanding where the
application of best practice and learning from other areas can help us improve locally
and get people home from an acute setting as quickly and safely as possible.  By
taking part in this collaborative, we aim to reduce further the number of people delayed
in our system and to ensure we apply optimum practice across acute and community
setting to do so.   
Page 153

Page 154

Moray Integration Joint Board Annual Accounts 2024/25 25 
MANAGEMENT COMMENTARY (continued) 
Realignment of Organisational Structures 
Since its inception the MIJB has sought to ensure the most effective and efficient
structures are in place to support the delivery of its strategic aims and overall strategic
plan.  Over the course of 2025/26 a review of the HSCM organisational structure will
take place that will support these aims and ensure that both HSCM and the MIJB have
the right resources in place, and the right operational structure to enact our plans,
deliver the best outcomes for people and operate sustainably within the current
challenging financial conditions.  Our organisational structure supports how we deliver
our ambitions in our communities and directly with people and is a key enabler in
driving progress against our priorities. 
Strengthening Integration and Oversight of Children, Families and Justice
within our system 
Children, Families and Justice Services were delegated formally to the MIJB in
2023/24 under the integration scheme and there is now reporting of these services
within the Clinical and Care Governance structures in place.  Moray Council and
Councillors retain statutory responsibilities for outcomes for Children and also remain
Corporate Parents in respect of those Children and Young People who are cared for
or accommodated out with their families.  MIJB is committed to ensuring robust
reporting across the system that ensures all partners can fulfil their statutory
obligations while focussing on improving outcomes for our young people.  A review
of current reporting arrangements will take place to reduce any duplication in
reporting whilst strengthening oversight of performance and delivery.
Strengthening Performance Oversight 
The MIJB approved its Strategic Delivery Plan at its meeting in May 2025, and this
now provides a clear line of sight from Strategic Plan to the impact of the
programmes, services and initiatives in place to deliver it.  Over the course of this
year, we aim to further strengthen this line of sight, aligned to the Board’s Risk
Appetite Statement, to ensure that our programmes of work are effective in achieving
their objectives and represent value for money.  
Page 154

Page 155

Moray Integration Joint Board Annual Accounts 2024/25 26 
MANAGEMENT COMMENTARY (continued) 
In addition, we will seek to: 
 Maintain our focus on early intervention and prevention, reducing demand and
supporting the resilience of people and communities.  We’ll undertake learning
from the successful Community Appointment Day which took place in Elgin as
a possible model to support this;
 Continue to develop how we care for our staff well-being, with staff our most
valuable asset;
 Provide leadership and participation as key partners in the NHS Grampian led
Strategic Change Programme and ensure we explore effective joint working;
 Focus our budget setting efforts in the context of the Medium Term Financial
Strategy and longer term sustainability. 
…………………………  ……………………… ……………………… 
Elaine Kirby     Judith Proctor  Deborah O’Shea 
Chair of Moray IJB   Chief Officer            Chief Financial Officer 
Page 155

Page 156

Moray Integration Joint Board Annual Accounts 2024/25 27 
STATEMENT OF RESPONSIBILITIES 
Responsibilities of the MIJB 
 To make arrangements for the proper administration of its financial affairs and
to secure that one of its officers has the responsibility for the administration of
those affairs.  In Moray Integration Joint Board, that officer is the Chief Financial
Officer; 
 To manage its affairs to achieve best value in the use of its resources and
safeguard its assets; 
 Ensure the Annual Accounts are prepared in accordance with legislation (The
Local Authority Accounts (Scotland) Regulations 2014) and so far as is
compatible with that legislation, in accordance with proper accounting practices
(section 12 of the Local Government in Scotland Act 2003); and 
 To approve the Annual Accounts. 
Signed on behalf of the Moray Integration Joint Board 
Elaine Kirby
Chair of Moray IJB
Page 156

Page 157

Moray Integration Joint Board Annual Accounts 2024/25 28 
STATEMENT OF RESPONSIBILITIES (continued)
Responsibilities of the Chief Financial Officer 
The Chief Financial Officer is responsible for the preparation of the Moray Integration
Joint Board’s statement of accounts in accordance with proper practices as set out in
the CIPFA/LASAAC Code of Practice on Local Authority Accounting in the United
Kingdom (the Code). 
In preparing the Annual Accounts the Chief Financial Officer has: 
 Selected suitable accounting policies and applied them consistently; 
 Made judgements and estimates that were reasonable and prudent; 
 Complied with legislation; and 
 Complied with the local authority code (in so far as it is compatible with
legislation). 
The Chief Financial Officer has also: 
 Kept proper accounting records that were up to date; and 
 Taken reasonable steps for the prevention and detection of fraud and other
irregularities. 
I certify that the financial statements give a true and fair view of the financial position
of the Moray Integration Joint Board as at 31 March 2025 and the transactions for the
year then ended. 
Deborah O’Shea FCCA
Chief Financial Officer 
Page 157

Page 158

Moray Integration Joint Board Annual Accounts 2024/25 29 
REMUNERATION REPORT 
Introduction
This Remuneration Report is provided in accordance with the Local Authority Accounts
(Scotland) Regulations 2014 (SSI2014/200) as part of the MIJB annual accounts.  This
report discloses information relating to the remuneration and pension benefits of
specified MIJB members. 
All information disclosed in the tables is subject to external audit.  Other sections within
the Remuneration Report will be reviewed for consistency with the financial
statements. 
Moray Integration Joint Board
The voting members of MIJB are appointed through nomination by Moray Council and
Grampian Health Board.  There is provision within the Order to identify a suitably
experienced proxy or deputy member for both the voting and non-voting membership
to ensure that business is not disrupted by lack of attendance by any individual. 
MIJB Chair and Vice-Chair
Nomination of the MIJB Chair and Vice-Chair post holders alternates every 18 months
between a Councillor and a Health Board non-executive member. 
The MIJB does not provide any additional remuneration to the Chair, Vice-Chair or
any other board members relating to their role on the MIJB.  The MIJB does not
reimburse the relevant partner organisations for any voting member costs borne by
the partner. 
The MIJB does not have responsibilities in either the current or in future years for
funding any pension entitlements of voting MIJB members.  Therefore, no pension
rights disclosures are provided for the Chair or Vice-Chair. 
Taxable
Expenses
2023/24
Name Position Held Nomination
By
Taxable
Expenses
2024/25
£    £
- Dennis
Robertson
Vice-Chair
01/04/24 – 26/09/24;
01/04/2025 to date
Chair 
27/09/24 to 31/03/25
Grampian
Health Board -
- Cllr Tracy
Colyer
Chair
01/04/24 – 26/09/24 Moray
Council  -
- Cllr Elaine
Kirby
Vice-Chair 21/11/24 –
31/03/25
Chair 1/04/25 to date
Moray
Council -
Page 158

Page 159

Moray Integration Joint Board Annual Accounts 2024/25 30 
REMUNERATION REPORT (continued) 
Officers of the MIJB
The MIJB does not directly employ any staff in its own right; however specific post-
holding officers are non-voting members of the Board. 
Chief Officer
Under section 10 of the Public Bodies (Joint Working) (Scotland) Act 2014 a Chief
Officer for the integration joint board has to be appointed and the employing partner
has to formally second the officer to the Board.  The employment contract for the Chief
Officer will adhere to the legislative and regulatory framework of the employing partner
organisation.  The remuneration terms of the Chief Officer‘s employment are approved
by the Board. 
Other Officers
No other staff are appointed by the MIJB under a similar legal regime.  Other non-
voting board members who meet the criteria for disclosure are included in the
disclosures below. 
Total
2023/24 Senior Employees Salary, Fees &
Allowances Total 2024/25
£  £ £
122,460
Simon Bokor-Ingram
Chief Officer (1/04/24-
31/05/24)
20,268 20,268
- Judith Proctor (from
25/07/24) 95,673 95,673
83,476
Deborah O’Shea
Interim Chief Financial
Officer
90,729 90,729 
In respect of officers’ pension benefits, the statutory liability for any future contributions
to be made rests with the relevant employing partner organisation.  On this basis there
is no pensions liability reflected on the MIJB balance sheet for the Chief Officer or any
other officers. 
The MIJB however has a responsibility for funding the employer contributions for the
current year in respect of the officer time spent on fulfilling the responsibilities of their
role on the MIJB.  The following table shows the MIJB’s funding during the year to
support the officers’ pension benefits.  The table also shows the total value of accrued
pension benefits which may include benefits earned in other employment positions
and from each officer’s own contributions. 
Page 159

Page 160

Moray Integration Joint Board Annual Accounts 2024/25 31 
REMUNERATION REPORT (continued) 
NOTE: no bonuses, expenses allowances, compensation for loss of office or any
taxable benefits were made in 2024/25 
In Year Pension
Contributions Accrued Pension Benefits  
Year to
31/03/24 
Year to
31/03/25  
As at
31/03/2025 
Difference
from
31/03/2024 
£ £  £ 000’s £ 000’s 
Simon Bokor-
Ingram, Chief
Officer (*)  24,346 4,378 
Pension  40 (6)
Lump Sum 101 (22) 
Judith Proctor,
Chief Officer  -  21,526
Pension 36 9
Lump Sum 99 21 
Deborah
O’Shea
Chief Financial
Officer 
7,179  20,339
Pension 9 (19)
Lump Sum 31 - 
(*) Simon Bokor-Ingram figures included in the table above, relate to the full year and
employment after Chief Officer, as figures are unable to be apportioned.
Page 160

Page 161

Moray Integration Joint Board Annual Accounts 2024/25 32 
REMUNERATION REPORT (continued) 
Disclosure by Pay bands
As required by the regulations, the following table shows the number of persons whose
remuneration for the year was £50,000 or above, in bands of £5,000. 
Number of Employees in
Band 2023/24 Remuneration Band Number of Employees in
Band 2024/25
1 £80,000 - £84,999 -
- £85,000 - £89,999 1
1 £120,000 - £124,999 - 
£130,000 - £134,999 1 
Exit Packages
There were no exit packages agreed by the MIJB during 2024/25 financial year, or in
the preceding year. 
………………………..     ………………………
Elaine Kirby           Judith Proctor
Chair of Moray IJB      Chief Officer                                                                                 
Page 161

Page 162

Moray Integration Joint Board Annual Accounts 2024/25 33 
ANNUAL GOVERNANCE STATEMENT 
The Annual Governance Statement describes the Moray Integration Joint Board’s
(MIJB) governance arrangements and reports on the effectiveness of the MIJB’s
system of internal control.   
Scope of Responsibility 
The MIJB is responsible for ensuring that its business is conducted in accordance with
the law and appropriate standards, and that public money is safeguarded and used
efficiently and effectively in pursuit of best value. 
In discharging its responsibilities, the MIJB has established arrangements for its
governance which includes the system of internal control. This system is intended to
manage risk and support the achievement of the MIJB’s policies, aims and objectives. 
The system provides reasonable but not absolute assurance of effectiveness. 
The MIJB places reliance of the systems of internal control of NHS Grampian systems
and Moray Council, which supports organisational compliance of policies and
procedures in addition to those of the MIJB. Assurances are required on the
effectiveness of the governance arrangements of all three organisations, meaning a
significant failure in one of the three Partners may require to be disclosed in the annual
accounts of all three Partners. 
The Governance Framework 
The CIPFA/SOLACE framework for ‘Delivering Good Governance in Local
Government’ last updated in 2016 remains current and provides a structured approach
in defining seven principles that underpin effective governance arrangements.  Whilst
the framework is written specifically for Local Government, the principles apply equally
to integration authorities, and while the MIJB continues to evolve as an entity in its
own right. It continues to draw on the governance assurances of NHS Grampian and
Moray Council as its principal funding partners.   
Given the scope of responsibility within the MIJB and the complexities surrounding the
assurance arrangements, a Local Code of Corporate Governance was developed and
the MIJB assesses the effectiveness of its governance arrangements against the
principles set out in the document.  The Code outlines the seven governance principles
from the CIPFA/SOLACE guidance (as referenced below) and provides the sources
of assurance for assessing compliance relative to the MIJB, Moray Council and NHS
Grampian.  These assurances include referencing the governance arrangements of
NHS Grampian and Moray Council which are summarised annually and published in
their respective Annual Governance Statements which form part of the annual
accounts of each organisation.  The respective governance statements can be found
on the individual organisations websites: Moray Council: Annual Accounts - Moray
Council and NHS Grampian: https://www.nhsgrampian.org/about-us/annual-
accounts/. 
Page 162

Page 163

Moray Integration Joint Board Annual Accounts 2024/25 34 
ANNUAL GOVERNANCE STATEMENT (continued) 
Key Governance Arrangements 
All of the scheduled Audit Performance and Risk and Clinical Care Governance
Committee meetings were held as timetabled during 2024/25.   
Health and Social Care Moray (HSCM) established an emergency response group
that has been operational since the end of March 2020, this has now transformed into
a Daily Response meeting. Representation on the response groups of the Partner
organisations is provided by HSCM staff, ensuring the necessary links and flow of
information to ensure a co-ordinated response on a pan Grampian basis and locally
within Moray. 
There continues to be governance standards and collaborative working across the
whole system, both across the NHS Portfolios and Grampian wide system. The use of
a Grampian Operation Performance Escalation System (GOPES) was established to
enable senior leaders to have oversight of where pressures were located in the system
and to direct responses accordingly. This development has also strengthened the
identification of key metric thresholds to inform the levels for escalation. 
Evaluation of the Effectiveness of Governance
Governance Principle 1 – Behaving with integrity, demonstrating strong
commitment to ethical values and respecting the rule of law
Assessment of Effectiveness 
 The activities of the MIJB are governed by a Board comprising both voting
and non-voting members, drawn from a diverse range of backgrounds to
ensure broad representation. The Board meets bi-monthly and is supported
by regular development sessions that allow for in depth exploration of key
strategic and operational issues. Governance is further strengthened through
the work of two committees: the Audit, Performance and Risk Committee,
and a Clinical and Care Governance Committee, each with clearly defined
remits to support effective governance and assurance.  
The MIJB operates in accordance with Standing Orders, which set out the
rules governing the proceedings of the Board and its Committees. These
include the Scheme of Administration which defines the structure and remit
of the Board’s committees, ensuring clarity and consistency in governance
arrangements. 
 To uphold high standards of ethical conduct, the MIJB has appointed a
Standards Officer. This role supports compliance with the Ethical Standards
in Public Life etc. (Scotland) Act 2000, which requires members of devolved
public bodies to comply with Codes of Conduct approved by Scottish
Ministers. The Standards Officer also ensures alignment with guidance
issued by the Standards Commission for Scotland, reinforcing the Board’s
commitment to integrity, accountability, and ethical governance. 
Page 163

Page 164

Moray Integration Joint Board Annual Accounts 2024/25 35 
ANNUAL GOVERNANCE STATEMENT (continued) 
Governance Principle 2 – Ensuring openness and comprehensive stakeholder
engagement 
Assessment of Effectiveness 
 MIJB’s Standing Orders provide for public and press access to meetings and
reports, supporting transparency and accountability.  In response to positive
feedback and to enhance accessibility, hybrid meetings continued throughout
2024/25.  A dedicated website was developed for Health and Social Care
Moray and is continuously monitored for improvement, and about to transition
to a new platform to further improve the accessibility and quality of
information. Agendas, reports and minutes for all committees can be
accessed via Moray Council website, alongside links to all relevant strategies
of the MIJB.
 Both the voting and non-voting membership arrangements of the MIJB are in
line with the Public Bodies (Joint Working) (Integration Joint Boards)
(Scotland) Order 2014. There are eight voting members, four are elected
members appointed by Moray Council and four are non-executive members
of NHS Grampian Board. The non-voting membership comprises six
professional members and five stakeholder members representing: staff,
third sector bodies carrying out activities in relation to health and social care,
service users and unpaid carers, and six additional non-voting members
which include the Chief Executives of Moray Council and NHS Grampian in
an Ex-officio capacity. The broad membership of the MIJB ensures valued
input and engagement from a wide range of stakeholders.
 The Community Empowerment (Scotland) Act 2015 places a statutory duty
on MIJB and its Community Planning Partners to engage with communities
on the planning and delivery of services and securing local outcomes. The
MIJB has an approved Communications and Engagement Strategy which
recognises and promotes the active and meaningful engagement with all
stakeholders.   
Governance Principle 3 – Defining outcomes in terms of sustainable
economic, social and environmental benefits 
Assessment of Effectiveness 
 The MIJB Strategic Plan 2022-2032 building on the foundations of the 2019
plan, sets out long-term strategic objectives that are flexible and responsive to
emerging challenges and developments in health. To support the delivery of
these objectives a 3 year delivery plan was approved by MIJB in May 2025,
underpinned by a medium-term financial framework.
 The strategic plan is supported by a comprehensive suite of documents,
including a performance framework, workforce plan, and a communications,
engagement and participation plan. These documents are currently under
review, with a focus on enabling service transformation within existing financial
constraints.
 These documents collectively provide a structured approach to defining and
achieving outcomes, with a clear focus on medium term priorities.   The
outcomes are directly aligned with the delivery of health and social care services
and are aimed at driving measurable improvements for the population of Moray. 
Page 164

Page 165

Moray Integration Joint Board Annual Accounts 2024/25 36 
ANNUAL GOVERNANCE STATEMENT (continued) 
 In support of environmental sustainability, a climate change duties report is
compiled and submitted annually on behalf of the MIJB, demonstrating the
Board’s commitment to meeting its statutory environmental responsibilities 
Governance Principle 4 – Determining the interventions necessary to optimise
the achievement of intended outcomes 
Assessment of Effectiveness 
 The MIJB’s decision making processes are designed to ensure that Board
members receive clear, objective and comprehensive analysis of available
options. Each proposal outlines how intended outcomes will be achieved,
supported by detailed assessments of associated risks and opportunities.   
 Board papers reflect the broad range of strategic and operational matters under
consideration. These include regular updates from the Chief Officer on current
developments, as well as agenda items covering both opportunities and
challenges, particularly those arising from reconfiguration and transformation of
services. 
 The MIJB recognises the importance of sound financial governance and has
adopted the Financial Management Code promoted by CIPFA as a guiding
framework for effective financial administration.  A Medium-Term Financial
Strategy, approved in March 2025, supports this approach and will be reviewed
regularly to ensure alignment with the Strategic Plan, Delivery Plan and the
integration of delegated children’s services. 
Governance Principle 5 – Developing the entity’s capacity, including the
capability of its leadership and the individuals within it
Assessment of Effectiveness 
 The Senior Management Team (SMT) and Officers and have developed a
programme of Development sessions with Board members with a focus on the
challenging financial position and exploring opportunities for service
transformation. Officers present a range of proposals aimed at delivering the
MIJB’s strategic objectives whilst also contributing to the necessary financial
savings for the upcoming year. 
 The MIJB continues to prioritise leadership development and collaborative
working through the regular development sessions with Officers. These
sessions provide valuable opportunities for shared learning, strategic dialogue,
and constructive challenge, helping to strengthen leadership capabilities and
organisational resilience. 
Page 165

Page 166

Moray Integration Joint Board Annual Accounts 2024/25 37 
ANNUAL GOVERNANCE STATEMENT (continued) 
Governance Principle 6 – Managing risk and performance through robust
internal control and strong public financial management
Assessment of Effectiveness 
 As part of a robust risk monitoring framework the Strategic Risk Register was
co-developed with Board members during a dedicated development session in
October 2024 and was formally approved by the Board in May 2025. This
updated register will be reviewed monthly by the Senior Management Team and
updated and presented biannually to Audit, Performance and Risk Committee,
and annually to MIJB.   A related action log was created for monitoring purposes
and is owned and monitored by the Senior Management Team. The committee
agreed in October that the register would be presented biannually with the
caveat that any emerging or increasing risks would be presented as required.
 The Performance Management Framework has currently under review.
Performance reporting falls within the scope of the Audit, Performance and Risk
Committee and reporting is quarterly. This now includes reporting by the
delegated Children’s & Families Services.
 The internal control system is closely aligned with those of MIJB’s Partner
organisations, reflecting their operational responsibility for service delivery
under direction of the MIJB.  The Audit, Performance and Risk committee
through its consideration of reports monitors the effectiveness of internal control
procedures.  The MIJB Chief Internal Auditor undertakes an annual review of
the adequacy of internal controls and the opinion is included within this
statement.
 The MIJB benefits from the oversight of an independent S95 Officer, who is a
member of the Board. This Officer provides expert advice on all financial matters
and ensure timely preparation and reporting of budget estimates, monitoring
reports and annual accounts.
 Governance arrangements have been developed and maintained to comply with
the core functions of various good framework guidelines including Code of
Practice on Managing the Risk of Fraud and Corruption, Public Sector Internal
Audit Standards (incorporating the principles of the Role of the Head of Internal
Audit), Audit Committees: Practical Guidance for Local Authorities and Police.
These frameworks support the MIJB’s commitment to strong financial
stewardship and effective internal control. 
Page 166

Page 167

Moray Integration Joint Board Annual Accounts 2024/25 38 
ANNUAL GOVERNANCE STATEMENT (continued)
Governance Principle 7 – Implementing good practices in transparency,
reporting and audit to deliver effective accountability
Assessment of Effectiveness 
 MIJB business is conducted through an approved cycle of Board meetings.  To
promote openness and accessibility, recordings of Board meetings are made
available to the public. In addition, agendas, reports and minutes are published
and accessible for the public to inspect.  There is a standardised reporting format
in place to ensure consistency, clarify and transparency in decision making
processes.
 The MIJB demonstrates its commitment to accountability through publication of
both its Annual Accounts and Annual Performance Report. Following formal
approval by the Board.
 The Chief Internal Auditor reports independently to the Audit, Performance and
Risk committee with direct access to the Chief Officer, Chief Financial Officer
and Chair of the Audit, Performance and Risk committee on any matter of
concern. Throughout 2024/25, the Chief Internal Auditor has continued to
provide regular reports to the Committee, supporting effective oversight of
internal accounts and assurance processes. 
Review of Adequacy and Effectiveness 
The MIJB has a responsibility for conducting, at least annually, a review of the
effectiveness of the governance arrangements, including the system of internal
control.  The review is informed by the work of the Senior Management Team (which
has responsibility for the development and maintenance of the internal control
framework environment), the work of the Internal Auditors and the Chief Internal
Auditor’s annual report and the reports from the External Auditor and other review
agencies and inspectorates. 
Internal Audit Opinion 
Moray Council’s Internal Audit Section delivers the Internal Audit Service for the Moray
Integration Joint Board (MIJB), and the Council’s Audit and Risk Manager holds the
Chief Internal Auditor appointment to the MIJB until the 31st of March 2026. The
Council’s Internal Audit Section has adopted the Public Sector Internal Audit
Standards (PSIAS), which requires the Chief Internal Auditor to deliver an annual
internal audit opinion and report, which has also been used to inform this governance
statement. 
The Chief Internal Auditor’s evaluation of the adequacy and effectiveness of the MIJB
framework of governance, risk management and internal control includes
consideration of the findings from the audit work undertaken by the Chief Internal
Auditor in his role as the Audit and Risk Manager for the Moray Council. Assurance is
also sought from the Internal Audit Service Provider for NHS Grampian of the
governance processes adopted by that organisation. This includes the Chief Internal
Auditor now being provided with internal audit reports by the Internal Audit Service
Provider for NHS Grampian of interest to the MIJB. In addition, reports issued by other 
Page 167

Page 168

Moray Integration Joint Board Annual Accounts 2024/25 39 
ANNUAL GOVERNANCE STATEMENT (continued) 
external review agencies are considered in the opinion provided by the Chief Internal
Auditor. 
Internal Audit operates independently within the organisation, with no management-
imposed limitations on the scope of audit work performed. In accordance with PSIAS,
the Chief Internal Auditor prepares a risk-based Audit Plan for the MIJB, considering
the internal audit arrangements of both Moray Council and NHS Grampian functions. 
The Annual Audit Plan for 2024/25 agreed to the following audits to be undertaken: 
 Out of Area Placements- A review of the systems and procedures of people
receiving adult social care services who are out of the Moray area. 
 Residential Care- A review to assess the adequacy of procedures and
administrative arrangements for third-party suppliers that provide care home
services. The audit also included testing to verify the accuracy of financial
assessments and the charging of residential care for both respite and
permanent care residents. 
 Fostering and Kinship- An audit to review fostering and kinship payments of
fees and allowances, ensuring they comply with agreed policies and
procedures.
The audit review of out of area placements identified significant concerns regarding
the progress in determining the ordinary residence status of individuals receiving adult
social care services, contractual arrangements with care providers, and budgetary
control arrangements. A review of residential care highlighted the need for improved
administrative processes and the potential for further digitalisation. The fostering and
kinship payments audit was found to be well managed within the scope of the review,
though some administrative control improvements were noted. 
In addition to the projects outlined in the Audit Plan, governance arrangements were
reviewed to prevent fraud and corruption. The audit found that further improvements
are needed to enhance the effectiveness of counter fraud measures. 
Internal Audit has also undertaken follow-up reviews to evidence the implementation
of recommendations from previously issued audit reports. The follow-up audits
undertaken of Self-Directed Support and the Moray Integrated Community Store found
several recommendations where revised timescales for implementing
recommendations were required. A previous review of social care information
governance noted a need for a single case recording system. The Service is seeking
a replacement for the current arrangements for recording social care information, but
there is a need for this to be progressed in a timely manner. Implementation of
recommendations is a key element in determining the adequacy and effectiveness of
governance and internal control systems. If recommendations are not implemented in
a timely manner, then weaknesses in control and governance frameworks will remain.  
Page 168

Page 169

Moray Integration Joint Board Annual Accounts 2024/25 40 
ANNUAL GOVERNANCE STATEMENT (continued)
The Chief Internal Auditor, after considering the results of the work carried out by
Internal Audit, together with other sources of assurance, has provided limited
assurance that the Moray Integration Joint Board had adequate systems of
governance and internal control for the year ended 31 March 2025. 
Prior Year Governance Issues 
The Annual Governance Statement for 2023/24 highlighted a number of areas for
development in looking to secure continuous improvement. An assessment of
progress is provided below: 
Area for Improvement Identified in
2023/24 
Action Undertaken / Progress Made in
2024/25
GP visioning programme to deliver
resilience and sustainability. 
Financial Sustainability with best value
and outcomes. 
Assurance and reporting for Children’s
Social Work and Justice Services. 
Progress within the agreed priority
workstreams has been made across the
year and there have been regular updates
to the IJB on the programme.  A Visioning
refresh event was held in March 2025 and
further work to strengthen the programme
deliverables will be taken forward from that
into the next financial year. 
The Chief Officer has put in place a Budget
Savings Oversight Group (BSOG) which
supports oversight of the delivery of the
savings programme on a monthly basis.  A
Programme Management Office (PMO)
has been established to support this work
and our senior responsible officers for each
savings programme.  In addition, regular tri-
partite meetings between the Chief Officer,
Chief Finance Officer and the Director and
Head of Finance in NHS Grampian and
Moray Council take place to ensure shared
visibility on financial matters for all partners. 
Assurance and reporting for CF&J
continues to take place in both the IJB and
its committees and within Moray Council
Structures.  Resource has now been
secured to support a review of this across
2025/26 to ensure robust and proportionate
reporting that is cognisant of the statutory
roles of partner organisations.
Page 169

Page 170

Moray Integration Joint Board Annual Accounts 2024/25 41 
Area for Improvement Identified in
2023/24 
Action Undertaken / Progress Made in
2024/25
Improvement in compliance with audit
recommendations. 
Improvements continue to be made in this
area with a process now in place to review
audit actions in both the Operational
Management Team (OMT) and within the
Chief Officer’s Senior Management Team
(SMT).  This provides visibility on the
delivery of actions within agreed timescales
and on those actions that remain open and
overdue so that a focus can be put upon
those and ensure their closure. 
Improvement on progress has been
evidenced; however, this area of
improvement requires further development
and will be included for developments in
2025/26. 
Further Developments 
Following consideration of the review of adequacy and effectiveness, the following
action plan has been established to ensure continual improvement of the MIJB’s
governance arrangements and progress against the implementation of these issues
will be assessed as part of the next annual review. 
Areas of focus for 2025/26
1. Developing further our approaches to frailty and Discharge without Delay.
2. Realigning our organisational structure to ensure effective delivery of strategy
and transformation.
3. Integration of Children’s Social Work and Justice Services governance and
oversight within the IJB.
4. Further strengthen performance oversight of the Board’s key strategies and
priorities.
5 Continue to improve on the progress for compliance with audit
recommendations. 
ANNUAL GOVERNANCE STATEMENT (continued)
Page 170

Page 171

Moray Integration Joint Board Annual Accounts 2024/25 42 
ANNUAL GOVERNANCE STATEMENT (continued) 
Key Governance challenges going forward will involve: 
 Providing capacity to meet statutory obligations and ambitions to transform
services, whilst managing expectations, increasing complexity and rising
demand for services and the wider societal economic challenges now
presented that also potentially drive demand. 
 As a Board, difficult decisions will be required in balancing how we meet the
needs of our community whilst operating within the available resource
envelope, this will be supported by our approach to risk as set out in our risk
appetite statement. 
 Continuing to address our work force challenges in respect of recruitment and
retention and where persistent vacancies will necessitate the need for redesign
of roles and/or services. 
 Continuing to work closely with NHS Grampian, Moray Council and Moray
Community Planning Partnership to build on existing relationships and
establishing collaborative leadership, and to maximise the opportunities from
an expanded health and social care remit within the revised Portfolio approach,
including Dr Grays hospital, and how the IJB contributes to the wider
community planning agenda in Moray and the North East. 
 Continuing to implement the recommendations of internal and external audit,
including learning from national reviews. 
 Continuing work with teams to provide assurance to MIJB as we develop the
governance structures for Children’s Social Work and Criminal Justice
Services that support decision making on how best to tackle poverty and
inequalities. 
 There have been no significant events up to the authorised for issue date. 
Page 171

Page 172

Moray Integration Joint Board Annual Accounts 2024/25 43 
ANNUAL GOVERNANCE STATEMENT (continued) 
Statement 
In our respective roles as Chair and Chief Officer of the MIJB, we are committed to
ensuring good governance and recognise the contribution it makes to securing
delivery of service outcomes in an effective and efficient manner. This annual
governance statement summarises the MIJB’s current governance arrangements and
affirms our commitment to ensuring they are regularly reviewed, developed and fit for
purpose.  Whilst recognising that improvements are required, as detailed earlier in the
statement, it is our opinion that a reasonable level of assurance can be placed upon
the adequacy and effectiveness of the MIJB’s governance arrangements. 
The ongoing challenge will be to meet all operational demands and pressures as we
continue to operate within the legacy of the Covid 19 pandemic and global financial
pressures, both of which have impacted at a socioeconomic level on our region and
the community. Pressure on financial settlements is increasing for all partners, and we
will continue to engage with them, the Scottish Government and the wider community
to agree plans and outcomes that are both sustainable and achievable within this
context.  Taking that forward will be challenging as we aim to fulfil the nine Health and
Wellbeing national health and well-being outcomes, and the strategic priorities
identified and detailed in our Strategic Plan.  Good governance remains an essential
focus in delivering services in a way that both meets the needs of communities and
discharges statutory best value responsibilities. 
These were arrangements in place for 2024/25 and up to the date of authorised for
issue. 
…………………………    ………………………
Elaine Kirby      Judith Proctor
Chair of Moray IJB     Chief Officer 
Page 172

Page 173

Moray Integration Joint Board Annual Accounts 2024/25 44 
COMPREHENSIVE INCOME AND EXPENDITURE STATEMENT 
This statement shows the cost of providing services for the year ended 31 March 2025
according to generally accepted accounting practices.   
2023/24  2024/25
Net Expenditure  Net Expenditure   
£ 000  £ 000
7,942 Community Hospitals 8,328
5,702 Community Nursing 6,166
18,366 Learning Disabilities 19,975
11,506 Mental Health 12,055
1,726 Addictions 1,763
213 Adult Protection & Health Improvement 273
23,044 Care Services Provided In-House 22,754
25,191 Older People & Physical & Sensory Disability
Services 27,034
1,881 Intermediate Care and Occupational Therapy 1,972
1,808 Care Services Provided by External Providers 1,817
10,012 Other Community Services 10,280
2,828 Administration & Management 3,152
1,299 Other Operational services 1,535
21,339 Primary Care Prescribing 21,937
19,939 Primary Care Services 21,331
5,936 Hosted Services 5,665
1,777 Out of Area Placements 1,971
949 Improvement Grants 1,021
19,762 Children & Justice Services 19,625
6,898 Strategic Funds & Other Resources 6,020
14,665 Set Aside  15,639
202,783 Cost of Services 210,315   
(200,086) Taxation and Non-Specific Grant Income (note 5) (209,779)
2,697 Deficit on provision of Services 536
2,697 Total Comprehensive Income and Expenditure 536 
There are no statutory or presentational adjustments which reflect the MIJB’s
application of the funding received from partners.  The movement in the General Fund
balance is therefore solely due to the transactions shown in the Comprehensive
Income and Expenditure Statement. Consequently, an Expenditure and Funding
Analysis is not provided in these annual accounts. 
Children & Justice Services were integrated into the MIJB from 2023/24, with the first
year being the shadow year meaning all financial responsibilities remained with the
Council but from 2024/24 the MIJB has full control over the finances.
Page 173

Page 174

Moray Integration Joint Board Annual Accounts 2024/25 45 
MOVEMENT IN RESERVES STATEMENT 
This statement shows the movement in the year on the Moray Integration Joint Boards
(MIJB) reserves. The movements which arise due to statutory adjustments which
affect the General Fund balance are separately identified from the movements due to
accounting practices.  Additional detail included within note 7 on page 51. 
Movement of Reserves During
2023/24  
General
Fund
Balance   
£000    
Opening Balance at 1 April 2024   (1,986)    
Total Comprehensive Income and
Expenditure 
536        
(Increase) in 2024/25   536        
Closing Balance at 31 March 2025                   (1,450)     
Movement of Reserves During
2023/24  
General
Fund
Balance   
£000    
Opening Balance at 1 April 2023   (4,683)    
Total Comprehensive Income and
Expenditure 
2,697        
Decrease in 2023/24   2,697        
Closing Balance at 31 March 2024                   (1,986)     
Page 174

Page 175

Moray Integration Joint Board Annual Accounts 2024/25 46 
BALANCE SHEET 
The Balance Sheet shows the value of the Moray Integration Joint Board’s (MIJB)
assets and liabilities as at the balance sheet date.  The net assets of the MIJB (assets
less liabilities) are matched by the reserves held by the MIJB. 
31 March
2024
£000    Notes
31 March
2025
£000    
1,986 Short Term Debtors 6 1,450 
Current Assets      
- Short Term Creditors  - 
Current Liabilities      
- Provisions  -            
Long Term Liabilities      
1,986 Net Assets           1,450    
1,986 Usable Reserve General Fund 7 1,450            
1,986 Total Reserves  1,450 
The unaudited annual accounts were issued on 19 June 2025. 
The Annual Accounts present a true and fair view of the financial position of the
MIJB as at 31 March 2025 and its income and expenditure for the year then ended. 
Deborah O’Shea FCCA 
Chief Financial Officer 
Page 175

Page 176

Moray Integration Joint Board Annual Accounts 2024/25 47 
NOTES TO THE FINANCIAL STATEMENTS
Note 1 Significant Accounting Policies 
General Principles 
The Financial Statements summarise the Moray Integration Joint Board’s (MIJB)
transactions for the 2024/25 financial year and its position at the year-end of 31 March
2025. 
The MIJB was established under the requirements of the Public Bodies (Joint Working)
(Integration Joint Boards) (Scotland) Act 2014 and is a Section 106 body as defined
in the Local Government (Scotland) Act 1973. 
The Financial Statements are therefore prepared in compliance with the Code of
Practice on Local Authority Accounting in the United Kingdom 2024/25, supported by
International Financial Reporting Standards (IFRS), unless legislation or statutory
guidance requires different treatment. 
The accounts are prepared on a going concern basis, which assumes that the MIJB
will continue in operational existence for the foreseeable future. The historical cost
convention has been adopted. 
Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when settlement in
cash occurs. In particular: 
 Expenditure is recognised when goods or services are received, and their
benefits are used by the MIJB.
 Income is recognised when the MIJB has a right to the income, for instance by
meeting any terms and conditions required to earn the income, and receipt of
the income is probable.
 Where income and expenditure have been recognised but settlement in cash
has not taken place, a debtor or creditor is recorded in the Balance Sheet.
 Where debts may not be received, the balance of debtors is written down. 
Funding
The MIJB is primarily funded through funding contributions from the statutory funding
partners, Moray Council and Grampian Health Board.  Expenditure is incurred as the
MIJB commissions’ specified health and social care services from the funding partners
for the benefit of service recipients in Moray area. 
Cash and Cash Equivalents
The MIJB does not operate a bank account or hold cash. Transactions are settled on
behalf of the MIJB by the funding partners.  Consequently, the MIJB does not present
a ‘Cash and Cash Equivalent’ figure on the balance sheet.  The funding balance due
to or from each funding partner as at 31 March is represented as a debtor or creditor
on the MIJB’s Balance Sheet.   
Page 176

Page 177

Moray Integration Joint Board Annual Accounts 2024/25 48 
NOTES TO THE FINANCIAL STATEMENTS (continued) 
Note 1 Significant Accounting Policies (continued) 
Employee Benefits
The MIJB does not directly employ staff.  Staff are formally employed by the funding
partners who retain the liability for pension benefits payable in the future. The MIJB
therefore does not present a Pensions Liability on its Balance Sheet. 
The MIJB has a legal responsibility to appoint a Chief Officer.  More details on the
arrangements are provided in the Remuneration Report. The charges from the
employing partner are treated as employee costs.  Where material the Chief Officer’s
absence entitlement as at 31 March is accrued, for example in relation to annual leave
earned but not yet taken. 
Charges from funding partners for other staff are treated as administration costs. 
Reserves
The MIJB’s reserves are classified as either Usable or Unusable Reserves.   
The MIJB’s only Usable Reserve is the General Fund. The balance of the General
Fund as at 31 March shows the extent of resources which the MIJB can use in later
years to support service provision. 
Indemnity Insurance
The MIJB has indemnity insurance for costs relating primarily to potential claim
liabilities regarding Board members.  Grampian Health Board and Moray Council have
responsibility for claims in respect of the services that they are statutorily responsible
for and that they provide. 
Unlike NHS Boards, the MIJB does not have any ‘shared risk’ exposure from
participation in the Clinical Negligence and Other Risks Indemnity Scheme (CNORIS). 
The MIJB participation in the CNORIS scheme is therefore analogous to normal
insurance arrangements. 
Note 2 Critical Judgements and Estimation Uncertainty 
In applying the accounting policies, the MIJB has had to make certain judgements
about complex transactions or those involving uncertainty about future events.  There
are no material critical judgements or estimation uncertainty. 
Page 177

Page 178

Moray Integration Joint Board Annual Accounts 2024/25 49 
NOTES TO THE FINANCIAL STATEMENTS (continued) 
Note 3 Events after the Reporting Period 
The unaudited accounts were issued by Deborah O’Shea, Chief Financial Officer on
19 June 2025. Events taking place after this date are not reflected in the financial
statements or notes. 
Note 4 Expenditure and Income Analysis by Nature     
2023/24  2024/25
£000  £000
95,500 Services commissioned from Moray
Council
98,216
107,247 Services commissioned from  Grampian
Health Board
112,061
36 Auditor Fee: External Audit Work 38
202,783 Total Expenditure 210,315   
(200,086) Partners Funding Contributions and Non-
Specific Grant Income
(209,779)
2,697 Deficit on the Provision of Services 536 
Page 178

Page 179

Moray Integration Joint Board Annual Accounts 2024/25 50 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 5 Taxation and Non-Specific Grant Income 
2023/24  2024/25
£000  £000
84,615 Funding Contribution from Moray Council 88,442
115,471 Funding Contribution from Grampian
Health Board
121,337
200,086 Taxation and Non-specific Grant
Income
209,779 
The funding contribution from Grampian Health Board shown above includes
£15.639m in respect of ‘set aside’ resources relating to acute hospital and other
resources. These are provided by Grampian Health Board who retains responsibility
for managing the costs of providing the services. The MIJB however has responsibility
for the consumption of, and level of demand placed on, these resources.   
Note 6 Debtors 
31 March
2024 
31 March
2025
£000  £000
1,723 Grampian Health Board 1,187
263 Moray Council 263
1,986 Debtors 1,450 
Amounts owed by the funding partners are stated on a net basis. Creditor balances
relating to expenditure obligations incurred by the funding partners but not yet settled
in cash terms are offset against the funds they are holding on behalf of the MIJB. 
Page 179

Page 180

Moray Integration Joint Board Annual Accounts 2024/25 51 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 7 Usable Reserve: General Fund 
The MIJB holds a balance on the General Fund for two main purposes: 
 To earmark, or build up, funds which are to be used for specific purposes in the
future, such as known or predicted future expenditure needs. This supports
strategic financial management. 
 To provide a contingency fund to cushion the impact of unexpected events or
emergencies. This is regarded as a key part of the MIJB’s risk management
framework. 
The table below shows the movements on the General Fund balance: 
Earmarked
Reserves    
General
Reserves
PCIP &
Action 15
Other
Earmarked
Total  
£000 £000 £000 £000
Balance at 1 April
2023 
- 937 3,746 4,683
Transfers (out) 
2023/24 
- (904) (1,793) (2,697)
Balance at 31
March 2024 
- 33 1,953 1,986
Transfer (out)
2024/25 
- (33) (503) (536)
Balance at 31
March 2025 
- - 1,450 1,450 
Primary Care Improvement Fund (PCIP) - The purpose of this fund is to ring fence
funding received from the Scottish Government as part of its Primary Care
Transformation Plan; this includes Action 15 funding as part of this plan. 
Other earmarked reserves are noted in detail on pages 18 to 20. 
Page 180

Page 181

Moray Integration Joint Board Annual Accounts 2024/25 52 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 8 Agency Income and Expenditure 
On behalf of all IJB’s within Grampian Health Board, the MIJB acts as the lead
manager for Grampian Medical Emergency Department (GMED) and Primary Care
Contracts.  It commissions services on behalf of the other IJBs and reclaims the costs
involved. The payments that are made on behalf of the other IJBs, and the
consequential reimbursement, are not included in the Comprehensive Income and
Expenditure Statement (CIES) since the MIJB is not acting as principal in these
transactions. 
The amount of expenditure and income relating to the agency arrangement is shown
below: 
2023/24  2024/25
£000  £000
10,615 Expenditure on Agency Services  10,680
(10,615) Reimbursement for Agency Services (10,680)
- Net Agency Expenditure excluded
from the CIES
-
Page 181

Page 182

Moray Integration Joint Board Annual Accounts 2024/25 53 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 9 Related Party Transactions 
The MIJB has related party relationships with Grampian Health Board and Moray
Council.  In particular the nature of the partnership means that the MIJB may influence,
and be influenced by, its partners. The following transactions and balances included
in the MIJB’s accounts are presented to provide additional information on the
relationships.   
Transactions with Grampian Health Board 
2023/24  2024/25
£000  £000
(115,471) Funding Contributions received from the
NHS Board
(121,338)
107,064 Expenditure on Services Provided by the      
NHS Board
111,864
183 Key Management Personnel: Non-Voting
Board Members
197
(8,224) Net Transactions with Grampian Health
Board
(9,227) 
Key Management Personnel: The Chief Officer and Chief Financial Officer are non-
voting Board members and are both employed by Grampian Health Board and
recharged to the MIJB.  Details of the remuneration of both officers are provided in the
Remuneration Report.  The Chief Officer is a joint appointment made by Moray Council
and Grampian Health Board and is jointly accountable to the Chief Executives of both
organisations, as such this post is jointly funded. The Chief Financial Officer, whilst a
Board appointment, does not share this arrangement of funding. 
Balances with Grampian Health Board 
31 March
2024 
31 March
2025
£000  £000
1,723 Debtor balances: Amounts due from
Grampian Health Board
1,187
1,723 Net Balance due from Grampian Health
Board
1,187 
Page 182

Page 183

Moray Integration Joint Board Annual Accounts 2024/25 54 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 9 Related Party Transactions (continued) 
Transactions with Moray Council 
2023/24  2024/25
£000  £000
(84,615) Funding Contributions received from the
Council
(88,441)
95,455 Expenditure on Services Provided by the
Council
98,178
81 Key Management Personnel: Non-Voting
Board Members
75
10,921 Net Transactions with Moray Council 9,812 
Balances with Moray Council 
31 March
2024 
31 March
2025
£000  £000
263 Debtor balances: Amounts due from Moray
Council
263
263 Net Balance due from Moray Council 263 
Page 183

Page 184

Moray Integration Joint Board Annual Accounts 2024/25 55 
NOTES TO THE FINANCIAL STATEMENTS (continued)
Note 10 VAT 
The MIJB is not registered for VAT and as such VAT is settled or recovered by the
partners. The VAT treatment of expenditure in the MIJB accounts depends on which
of the partners is providing the services as each of these partners are treated
differently for VAT purposes. 
VAT payable is included as an expense only to the extent that it is not recoverable
from His Majesty’s Revenue and Customs. VAT receivable is excluded from income. 
Note 11 Accounting Standards That Have Been Issued but Have Yet To Be
Adopted 
The Code requires the MIJB to identify any accounting standards that have been
issued but have yet to be adopted and could have material impact on the accounts.
This applies to the adoption of the following new or amended standards within the
2024/25 Code: 
 IAS 21 The Effects of Changes in Foreign Exchange Rate (Lack of
Exchangeability) issued in August 2023;
 IFRS 17 Insurance Contracts issued in May 2017; and
 Changes to the measurement of non-investment assets within the 2025 to 2026
Code include adaptations and interpretations of IAS16 Property, Plant and
Equipment, and IAS 38 Intangible Assets. 
The Code requires implementation from 1 April 2025 and there is, therefore, no impact
on the 2024/25 financial statements. 
The above amendments are not anticipated to have a material impact on the
information provided in the financial statements.    
Page 184

Page 185

Moray Integration Joint Board Annual Accounts 2024/25 56 
Page 185

Page 186

Page 186

Page 187

LOCAL CODE OF CORPORATE GOVERNANCE                                                                                                                                                                                                                                     
APPENDIX 2
GOVERNANCE PRINCIPLES
Principle A
Behaving with integrity, demonstrating strong commitment to ethical values and respecting the rule of law
SOURCES OF ASSURANCE
MIJB MORAY COUNCIL NHS GRAMPIAN
Code of Conduct (Jan 2025) Codes of Conduct Codes of Conduct
Financial Regulations (May 2025) Financial Regulations & Authorisation policy Standing Financial Instructions
Standards Officer Appointment (April 2024) Scheme of Administration Schedule of Reserved Decisions
Standing Orders (May 2022) Standing Orders Operational Scheme of Delegation
Register of Interests (annually) Human Resources Policies Standing Orders
Scheme of Administration (June 2018) Scheme of Delegation Human Resources Policies ( and Once for Scotland
policies around Employee Conduct)
Integration Scheme (Mar 2023) Register of Interests  Staff Governance Committee
Updated IJB Report Format (Sept 2022) Integrity Group  Register of Interests
Information Commissioners Officer Registration Employee Induction Process Feedback Service
Duty of Candour Arrangements  Computer Use Policy Staff Surveys
Whistleblowing Standards Duty of Candour Arrangements Employee Induction Process
Members handbook (2020) Monitoring Officer Annual Report  SLT Compliance Sub Group
Care for People Plan (under review 2025) Staff Engagement Programme Duty of Candour Arrangements 
E-Learning module on GDPR Policy for the Prevention, Detection and
Investigation of Suspected Fraud, Theft or
Corruption 
Whistleblowing policy Whistleblowing Policy   
Page 187

Page 188

LOCAL CODE OF CORPORATE GOVERNANCE                                                                                                                                                                                                                                     
GOVERNANCE PRINCIPLES
Principle B
Ensuring openness and comprehensive stakeholder engagement 
SOURCES OF ASSURANCE
MIJB MORAY COUNCIL NHS GRAMPIAN
Strategic Plan (2022-2032) Community Consultation & Engagement Annual Delivery Plan (includes Financial Plan)
Performance Management Framework (under review) Complaints Procedures & Responses Performance Management Framework
Annual Performance Report (annually) Use of Social Media  Freedom of Information Compliance
Communications & Engagement Strategy (under
review)
Freedom of Information Compliance Feedback Service
Community Consultation Locality Planning Population Health Committee
Third Sector Involvement Community Asset Transfers Grampian Clinical Strategy 
IJB Membership – Broad Range of Stakeholders Participatory Budgeting Plans NHS Grampian Area Partnership Forum
Use of Social Media  Equality, Diversity and Human Rights Policy
Freedom of Information Compliance  Stakeholder Engagement Framework
Workforce Forum  
Complaints Handling Policy  
Staff Surveys  
Governance Framework  
Community Risk Register (2021)  
IJB & Committee meetings held in public  
Unpaid Carers Strategy  
Moray Mental Health and Wellbeing Strategy 2016-
2026  
Locality Planning  
Page 188

Page 189

LOCAL CODE OF CORPORATE GOVERNANCE                                                                                                                                                                                                                                     
GOVERNANCE PRINCIPLES
Principle C
Defining outcomes in terms of sustainable economic, social and environmental benefits 
SOURCES OF ASSURANCE
MIJB MORAY COUNCIL NHS GRAMPIAN
Strategic Plan (2022-2032) Moray 2027 – a Plan for the Future Annual Delivery Plan (includes Financial Plan)
Annual Performance Report (annually) Corporate Plan – currently being updated Governance Framework
Performance Management Framework (under
review)
Community Planning Board  Performance Management Framework
Climate Change Duties and Responsibilities
(annually)
Local Outcome Improvement Plans – Updated
with Partner Agencies
Population Health Committee
Climate Change Duties and Responsibilities
(annually)
Governance Framework Grampian Clinical Strategy 
Equalities Outcomes (April 2025) Performance Management Framework  Equality & Diversity: Outcomes 
Best Value Report & Action Plan 
Improvement and Transformation Plans 
Page 189

Page 190

LOCAL CODE OF CORPORATE GOVERNANCE                                                                                                                                                                                                                                     
GOVERNANCE PRINCIPLES
Principle D
Determining the interventions necessary to optimise the achievement of intended outcomes 
SOURCES OF ASSURANCE
MIJB MORAY COUNCIL NHS GRAMPIAN
Risk Management Processes Risk Management Processes Risk Management Processes
Audit Planning (Internal & External) Audit Planning (Internal & External) Audit Planning (Internal & External)
Performance Management Framework Performance Management Framework  Performance Management Framework
Budget Monitoring Processes Budget Monitoring Processes Budget Monitoring Processes
Financial Planning Financial Planning – in line with Cipfa’s FM Code
Principles
Financial Planning
MIJB Committee Structure Moray Council Committee Structure Health & Safety Committee
Governance Framework Asset Management Group Annual Accountability Review
Health and Safety Arrangements Guide to Scrutiny at Moray Council Asset Management Group
Business Continuity Planning Workforce and ICT Strategies Ministerial Strategic Group – Self Assessment May
2019
Ministerial Strategic Group – Self Assessment –
May 2021 
Grampian Clinical Strategy 
Clinical Governance Committee 
Page 190

Page 191

LOCAL CODE OF CORPORATE GOVERNANCE                                                                                                                                                                                                                                     
GOVERNANCE PRINCIPLES
Principle E
Developing the entity’s capacity, including the capability of its leadership and the individuals within it. 
SOURCES OF ASSURANCE
MIJB MORAY COUNCIL NHS GRAMPIAN
Workforce Planning and Organisational
Development
Workforce Planning Employee Induction Processes
Workforce Forum Elected Member Induction / Development Board Member Induction
MIJB Voting Member Briefings Employee Development Team Staff Partnership Representation
MIJB Development Sessions Moray Management Methods Leadership Schemes
Board Member Induction Employee Induction Processes Staff Governance Committee
System Leadership Programme Employee Review and Development Programme ‘’ We Care’’ programme
Strategic Transformation Plan 2023-25 Staff Leadership Forum NHSG 3 Year Delivery Plan 2023-26 
Best Value Action Plan developed 
Page 191

Page 192

LOCAL CODE OF CORPORATE GOVERNANCE                                                                                                                                                                                                                                     
GOVERNANCE PRINCIPLES
Principle F
Managing risk and performance through robust internal control and strong public financial management. 
SOURCES OF ASSURANCE
MIJB MORAY COUNCIL NHS GRAMPIAN
Financial Regulations (May 2025) Financial Regulations (update 29.6.23) Standing Financial Instructions
Risk Management Strategy and Risk Reporting Risk Management Policy & Strategy Budget Monitoring & Financial Planning
Governance Framework Following the Public Pound – ALEO Funding Risk Management Framework & Reporting
Budget Monitoring & Financial Planning Performance Management Framework Audit Planning (Internal & External)
Production of Annual Accounts Scheme of Delegation Policy for the Prevention, Detection and
Investigation of Suspected Fraud, Theft or
Corruption
Audit Planning (Internal & External) Section 95 Officer Appointment Schedule of Reserved Decisions
Business Continuity & Incident Response Plans Fraud, Theft, Bribery & Corruption Policy  Operational Scheme of Delegation
Performance Management Framework Participation in National Fraud Initiative Annual Report and Accounts (including annual
governance statement)
Clinical & Care Governance Committee Information Assurance Group Performance, Assurance, Infrastructure and
Finance Committee
Moray Performance Review (Chief Executive) Budget Monitoring & Financial Planning Clinical Risk Management Group
Internal and External Audit Plans Audit Planning (Internal & External) Business Continuity & Incident Response Planning
Integration Scheme (Mar 2023) Procurement Regulations & Training 
Audit, Performance and Risk Committee Business Continuity Plans – to be revisited post
pandemic 
Risk Policy (Sept 2020)  
Clinical Risk Management Group  
Page 192

Page 193

LOCAL CODE OF CORPORATE GOVERNANCE                                                                                                                                                                                                                                     
Financial Recovery Plan  
Reserves Policy 2024  
Internal Auditor Reappointment 2024   
GOVERNANCE PRINCIPLES
Principle G
Implementing good practices in transparency, reporting and audit to deliver effective accountability. 
SOURCES OF ASSURANCE
MIJB MORAY COUNCIL NHS GRAMPIAN
Committee Reporting Framework Committee Reporting Framework Board sub-Committee Reporting Framework
Financial Reporting –  Budget Monitoring Financial Reporting –  Budget Monitoring Financial Reporting –  Budget Monitoring
Production & Approval of Annual Budget Production & Approval of Annual Budget Production of Annual Report and Accounts
Production of Annual Accounts  Production of Annual Accounts Audit Planning (Internal & External)
Audit Planning (Internal & External) Audit Planning (Internal & External) Assurance Framework 
Consultation Statutory Returns Public Sector Reform Act disclosure
Governance Framework Consultation Annual Complaints Report
Externally commissioned review of Commissioned
services
Chief Social Work Officer Annual Report Annual Duty of Candour Report
Locality Plans Scottish Public Services Ombudsman – Complaints
Reporting and Responses 
Climate Change Reporting  
Annual Complaints Report  
Annual Duty of Candour Report   
Page 193

Page 194

Page 194

Page 195

APPENDIX 3                                             
1
NHS Grampian
Board Secretariat
Summerfield House                               
2 Eday Road
Aberdeen AB15 6RE 
Ms Deborah O’Shea
Chief Finance Officer
Moray Health and Social 
Care Partnership
Date     12 June 2025
Our Ref          GB/JA
Enquiries to   Julie Anderson
Email   jule.anderson24@nhs.scot
Dear Ms O’Shea, 
Governance Statement 2024/25 
The Chief Executive is required to prepare a Governance Statement which forms part of the
Accountability Report in the Integrated Joint Board’s annual report and accounts as part of
the Health and Social Care partnerships. 
The Governance Statement requires each Chief Executive, in their capacity as Accountable
Officer, to report that they have maintained sound and effective systems of internal control,
performance and risk management across all of the Board’s activities. In preparing the
Governance statement, the Chief Executive is required to seek assurance from a range of
sources to evidence the organisation’s performance, risk management and internal control
framework, including responses to actual and emerging risks. 
NHS Grampian is due to report its annual accounts by 27th June 2025 and a draft
governance statement has been appended to aid in the preparation of the Integrated Joint
Board’s draft accounts for the year ended 31st March 2025. 
Should you require any clarification on the above or need guidance on matters that need to
be considered or reported in the formal statement please do not hesitate to contact myself
at julie.anderson24@nhs.scot. 
Yours sincerely 
Julie Anderson
Assistant Director of Finance 
Page 195

Page 196

2 
Draft NHS Grampian Governance Statement 2024/2025  
NHS Grampian is required to operate within the aspects of the Scottish
Public Finance Manual (SPFM) which are set out within the guidance
issued to Chief Executives and more generally to all Board members by the Scottish
Government Health and Social Care Directorates as being applicable to NHS Boards. The
SPFM is issued by Scottish Ministers to provide guidance to the Scottish Government and
other relevant bodies on the proper handling and `reporting of public funds. The SPFM
sets out the relevant statutory, parliamentary and administrative requirements,
emphasises the need for efficiency, effectiveness and economy, and promotes good
practice and high standards of propriety. 
As Accountable Officer, the Chief Executive is responsible for maintaining an adequate
and effective system of internal control that identifies, prioritises and manages the
principal risks facing the organisation, promotes achievement of the organisation’s aims
and objectives and supports compliance with the organisation’s policies and safeguarding
public funds. 
The Board continually monitors and reviews the effectiveness of the system of internal
control with a specific focus on the delivery of safe and effective patient care, achievement
of national and local targets and demonstrating best value and the efficient use of
resources.   
Key elements of the system of internal control include: 
 A Board which meets regularly to discharge its governance responsibilities, set the
strategic direction for the organisation and approve decisions in line with the
Scheme of Delegation. The Board comprises the Executive Directors and Non-
Executive members. The Board activity is open to public scrutiny with minutes of
meetings publicly available; 
 Scheme of Delegation, Standing Orders and Standing Financial Instructions
approved by the Board are subject to regular review to assess whether they are
relevant and fully reflective of both best practice and mandatory requirements; 
 Mature and organisation wide risk management arrangements built on localised risk
registers and processes which ensure, as appropriate, escalation of significant
instances of non-compliance with applicable laws and regulations that exceed our
risk appetite;   
 Dedicated full-time members of staff for key statutory compliance functions
including Information Governance, Health and Safety, fire and asbestos, tasked
with ensuring they are up to date with all relevant legislation and are responsible for
co-ordinating management action in these areas;   
 A focus on best value and commitment to ensuring that resources are used
efficiently, effectively and economically taking into consideration equal opportunities
and sustainable development requirements; 
 Each key governance committee is supported by a designated lead Executive
Director who has the delegated management accountability for statutory and
regulatory matters; 
Page 196

Page 197

3 
 Regular review of financial performance, risk management arrangements and non-
financial performance against key service measures and standards by the
Performance, Assurance, Finance and Infrastructure Committee; 
 Regular review of service quality against recognised professional clinical standards
by the Clinical Governance Committee; 
 Regular review of workforce arrangements and implementation of the NHS
Scotland Staff Governance standard by the Staff Governance Committee; 
 An active joint management and staff partnership forum (Grampian Area
Partnership Forum) with staff side representation embedded in all key management
teams and a dedicated full-time Employee Director who is a member of the Board; 
 Regular review of priorities for infrastructure investment and progress against the
agreed Asset Management Plan by an Asset Management Group chaired by a
Board Executive Director and including management representatives from all
operational sectors and representation from the clinical advisory structure; 
 Clear allocation of responsibilities to ensure we review and develop our
organisational arrangements and services in line with national standards and
guidance including consultation with all stakeholders on service change proposals
to inform decision making; 
 Promotion of effective cross-sector governance arrangements through participation
by the IJB Board members and the Chief Executives of each of the partner
organisations in the regular meetings between the Chief Executives of all Public
Sector organisations in Grampian and performance review meetings with each IJB
Chief Officer to further develop and drive improvement through integrated service
delivery; 
 A patient feedback service to record and investigate complaints and policies to
protect employees who raise concerns in relation to suspected wrongdoing such as
clinical malpractice, fraud and health and safety breaches; and 
 Separate governance arrangements for the NHS Grampian Charity including a
Chair of the Trustees elected from within the body of the Trustees, an annual
general meeting of all Trustees to agree all policy matters and an NHS Grampian
Charity sub-committee with delegated authority to manage the day to day
operational matters of the charity. 
Based on the evidence considered during the review of the effectiveness of the internal
control environment NHS Grampian has confirmed that there are no known outstanding
significant control weaknesses or other failures to achieve the standards set out in the
guidance on governance, risk management and control.   
Page 197

Page 198

Page 198

Page 199

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 19 JUNE 2025 
SUBJECT: ANNUAL PERFORMANCE REPORT 2024/25 
BY:  CHIEF OFFICER 
1. REASON FOR REPORT 
1.1 To present the Committee with the draft Annual Performance Report 2024/25. 
2. RECOMMENDATION 
2.1 It is recommended the Committee: 
i) consider and note the draft Annual Performance Report 2024/25 at
Appendix 1; 
ii) note the national indicator 11-19 information will be updated and
approved by Chair and Vice Chair of the Board prior to publication;
and 
iii) recommend to the Moray Integration Joint Board for approval and
publication of the Annual Performance Report 2024/25 by 31 July
2025. 
3. BACKGROUND 
3.1 The Public Bodies (Joint Working) (Scotland) Act 2014 specifies that a
performance report must be produced by an Integration Authority (IA) to ensure
that performance is open and accountable, and sets out an assessment of
performance in planning and carrying out the integration functions for which
they are responsible. This is to be produced for the benefit of Partnerships and
their communities. 
3.2 The required content of the Annual Performance Report (APR) is set out in the
Public Bodies (Joint Working) (Content of Performance Report) (Scotland)
Regulations 2014. 
3.3 APRs should demonstrate how the partnership has performed against the
National Health and Wellbeing Outcomes, within the context of the Strategic
Plan and Financial Statement. To support this, a set of Core Integration
Item 10.
Page 199

Page 200

Indicators have been developed by the Scottish Government and the Board is
expected to report upon performance using these and other locally specified
indicators. 
3.4 The Act obliges the IA to prepare a Performance Report for the previous
reporting year and for this to be published by the end of July each year.   
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 The APR provides an opportunity to present the story of the partnership’s
overall performance over the 12 month period, including progress against the
nine National Health and Wellbeing Outcomes and the commitments contained
within the 2022-32 Strategic Plan. 
4.2 The report represents the challenges services face as we seek to meet
increasing needs whilst reducing spend to keep within the approved budget. 
This highlights the pressures on our services, the exceptional work of our staff
and the ways in which we worked collaboratively with our partners to continue
to provide care and support to the people of Moray. 
4.3 The items for focus were identified by staff and managers following a call for
submissions. There is a vast amount of work being undertaken across Health
and Social Care Moray so it is not possible to capture it all but it is hoped that
the areas included provide examples of the breadth of work being undertaken. 
There is a continued effort to strengthen the links between the Strategic Plan,
service delivery plans and related performance monitoring reports, to facilitate
production of future APRs. 
4.4 The revised Strategic Delivery Plan incorporates projects from the Financial
Delivery Plan as well as requirements to build capacity to meet future needs
through review and redesign of pathways. Future reporting to this committee
will reflect performance against identified outcomes. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022-2032”
As defined within the Moray Integration Scheme values and meeting the
strategic aims contained within the MIJB Strategic Plan; Moray Partners
in Care 2022-32. Annual performance reports will be of interest to
Grampian Health Board and Moray Council in monitoring the success of
the integrated arrangements that they have put in place and in
considering whether or not there is a need to review the Integration
Scheme. 
(b) Policy and Legal
IJBs have a legal obligation to produce an annual performance report in
line with The Public Bodies (Joint Working) (Content of Performance
Reports) (Scotland) Regulations 2014 and the Scottish Government
Guidance: Health and Social Care Integration Partnerships: reporting
guidance. This includes reporting on the national Core Suite of
Integration Indicators provided by Public Health Scotland, using these to
support reporting on how well we are progressing the nine National
Page 200

Page 201

Health and Wellbeing Outcomes which apply to integrated health and
social care. The Moray APR complies with all the requirements with the
exception of a breakdown of spend per locality. Systems to facilitate a
robust report on this have not yet been implemented. 
(c) Financial implications
None directly associated with this report. 
(d) Risk Implications and Mitigation
IJBs have a legal obligation to produce an annual performance report
which meets the requirements set by Scottish Government. Should an
APR not be provided there would be a failure to meet legislation and it
would be difficult for the Moray IJB to confirm it undertakes its duties
related to accountability and good governance. 
(e) Staffing Implications
None directly associated with this report. 
(f) Property
None directly associated with this report. 
(g) Equalities/Socio Economic Impact
An Equality Impact Assessment is not required as there are no changes
to policy arising from this report and therefore there will be no differential
impact on people with protected characteristics. However, individual
strategies will comply with the need for an Equalities Impact Assessment
and is considered as part of our service planning process. 
(h) Climate Change and Biodiversity Impacts
None directly associated with this report. 
(i) Directions
None directly associated with this report. 
(j) Consultations
Chief Officer; Heads of Services; Chief Financial Officer, service
managers and the Caroline O’Connor, Committee Services Officer,
Moray Council, have been consulted for their areas of responsibility and
comments have been incorporated into this report and appendix. 
6. CONCLUSION 
6.1 Health and Social Care Moray’s Annual Performance Report is an
opportunity to reflect on the varied activities and improvements that have
been achieved over the year and consider how well the Partnership is
delivering the Strategic Plan. 
Author of Report: Jeanette Netherwood, Corporate Programme Manager, HSCM
Background Papers:  
Ref: 
Page 201

Page 202

Annual Performance Report 2024/25  APPENDIX 1 
APPENDIX 1 
Moray Integration
Joint Board 
Annual
Performance
Report 2024/25 
DRAFT 
Page 202

Page 203

Annual Performance Report 2024/25   
2
Moray Integration Joint Board
Contents 
1. Foreword ............................................................................................................. 3
2. Introduction ......................................................................................................... 4
3. Our board and partnership .................................................................................. 5
4. Our Strategic Plan vision and priorities ............................................................... 7
5. Our continuing challenges ................................................................................. 12
6. Measuring our performance .............................................................................. 15
7. Our performance in 2024/25 ............................................................................. 17
8. Our progress and achievements in 2024/25 ..................................................... 22
9. Working with communities across our localities ................................................ 49
10.  Financial performance and best value ............................................................... 52
11.  Looking forward – priorities for 2024/25 ............................................................ 58
Appendix A: Moray area profile ................................................................................ 60
Appendix B: Core suite of national indicators ........................................................... 61
Appendix C: Local indicators .................................................................................... 71
Appendix D: IJB decisions and directions ................................................................ 73
Appendix E: Changes to Membership of Moray Integration Joint Board during
2024/25 .................................................................................................................... 75
Appendix F: Inspections of services ......................................................................... 76 
Page 203

Page 204

Annual Performance Report 2024/25   
3
Moray Integration Joint Board
1. Foreword 
On behalf of the Moray Integration Joint Board, we are pleased to present our
Annual Performance Report for the financial year 2024/25. 
This year has been one of continued determination, transformation, and
collaboration. As we navigated the complexities of a changing financial landscape
and increasing demand for services, our commitment to delivering person-centred,
high-quality care has remained steadfast. 
Throughout 2024/25, we have taken significant steps toward long-term sustainability
by developing and beginning to implement our financial savings plan. These efforts
have required careful prioritisation and a willingness to make difficult decisions,
always guided by the principle of protecting and supporting the most vulnerable
members of our communities. 
The report that follows offers an honest and comprehensive reflection of our
performance against key national indicators, alongside real-world examples that
highlight how we are adapting our services to meet the evolving needs of the people
of Moray. 
Our focus has remained on improving outcomes, promoting independence, and
ensuring that people can access the right support at the right time. 
None of this would be possible without the dedication of our health and social care
workforce. Their professionalism, compassion, and adaptability have once again
proven to be the foundation of our progress. We are equally grateful to our partners
across the third and independent sectors, whose collaborative spirit and innovative
approaches continue to strengthen our shared response to complex challenges. 
We extend our heartfelt thanks to our unpaid carers and volunteers. Their vital
contributions underpin the resilience of our communities, and we recognise the
invaluable role they play in supporting health and wellbeing across Moray. 
As ever, we remain mindful that there is more work to do. The coming year will bring
further change and challenge, and we must continue to improve where we fall short,
listen to and learn from feedback, and work closely with individuals, families,
communities, and partners to co-design better, more sustainable services. 
This report reflects not just the achievements of the past year, but also the values
that guide us — integrity, collaboration, and a deep sense of responsibility to the
people we serve. 
We invite you to read this report and learn more about our journey. Together, we will
continue to strive toward our vision of a Moray where everyone can start well, live
well, and age well. 
Councillor Elaine Kirby, Chair, Moray Integration Joint Board
Dennis Roberston, Vice-chair, Moray Integration Joint Board 
Page 204

Page 205

Annual Performance Report 2024/25   
4
Moray Integration Joint Board
2. Introduction 
All Integration Joint Boards (IJBs) in Scotland are required to publish annual
performance reports to inform the public of progress in delivering their strategic
intent and against the National Outcome Indicators. 
This is the ninth annual report of the Moray Integration Joint Board (MIJB) which is a
Statutory Public Body under the Public Bodies (Joint Working)(Scotland) Act 2014. 
The MIJB has a broad range of health and social care services delegated to it by
NHS Grampian and Moray Council and has responsibility to undertake the strategic
planning and commissioning of those services for the benefit of the population of
Moray.  Operationally, these services are then delivered by Health and Social Care
Moray (HSCM) which is the partnership entity which brings together and delivers
care across the region. 
This report is the MIJB’s assessment of performance in carrying out its delegated
functions. This has been scrutinised against national performance (Appendix B) and
Ministerial Strategic Group indicators identified by the Scottish Government to
measure progress in delivering the National Health and Wellbeing Outcomes and
local key performance indicators (Appendix C). 
It also describes the progress of services managed and delivered by Health & Social
Care Moray in delivering on the vision and commitments set out in the MIJB’s
Strategic Plan, Partners in Care 2022-32, which was approved in November 2022
and the delivery plan which was approved in October 2023. 
Also included in this report is an assessment of the board’s financial performance. 
Page 205

Page 206

Annual Performance Report 2024/25   
5
Moray Integration Joint Board
3. Our board and partnership 
Our board 
The Public Bodies (Joint Working) (Scotland) Act 2014 established a legal framework
for the integration of health and social care services in Scotland. 
The purpose of integrating health and social care is to improve the experience of
people who use these services, and to make it easier for them to get the care and
support they need. This should be at the right time and in the right setting at any
point in their care journey, with a focus on community-based and preventative care. 
Since it was established in April 2016, the Moray Integration Joint Board (MIJB) has
been responsible for a range of functions delegated to it by Moray Council and NHS
Grampian. These are set out in the Scheme of Integration. 
There are eight voting members on the MIJB – four appointed by Moray Council and
four appointed by NHS Grampian. They are supported by non-voting members made
up of leading officers from the council and NHS, and representatives of the third
sector, people who receive services and unpaid carers. 
The MIJB’s role is to set the strategic direction for community health and social care
services and to deliver the priorities set out in its Strategic Plan through the local
partnership of Health & Social Care Moray (HSCM). 
The board receives payments from Moray Council and NHS Grampian to enable
delivery of local priorities for health and social care. It gives directions to the local
authority and health board as to how they must carry out their business to secure
delivery of the strategic plan. 
Our partnership 
Services are commissioned and delivered through the partnership of HSCM which
brings together staff employed by the local authority and by the NHS. 
The partnership is led by the Chief Officer supported by a Senior Management Team
and Operational Management Team. The Chief Officer reports to the Chief Officers
of Moray Council and NHS Grampian. 
In addition to directly providing services, the partnership also contracts for health and
social care services from a range of partner organisations in the Third and
Independent sectors. 
Within primary care services, a range of independent contractors including GPs,
dentists, optometrists, and pharmacists, are also contracted by the Health Board
under national frameworks. 
Services delegated to the MIJB and which are managed on its behalf by HSCM
include: 
Page 206

Page 207

Annual Performance Report 2024/25   
6
Moray Integration Joint Board
• Social work and social care (older people’s services, mental health services,
learning disability services, physical and sensory disability services)
• Primary care services including GPs and community nursing 
• Allied health professions including occupational therapy and physiotherapy 
• Community hospitals 
• Health improvement
• Community dental, ophthalmic and pharmaceutical services 
• Aspects of acute services (hospitals) relating to unscheduled care 
• Support for unpaid carers. 
Children and families health services hosted within the MIJB’s Scheme of Integration
include: 
• Health visiting
• School nursing
• Allied health professions.
Grampian-wide services hosted by Moray on behalf of all three health and social
care partnerships are: 
• Primary care contractors 
• The GMED out of hours primary care service.
In 2022, Moray Council, NHS Grampian Board and the MIJB agreed to progress with
delegation of Children & Families and Justice Services to the MIJB. The Moray
Integration Scheme was revised to reflect these changes and was approved by
Scottish Ministers on 16 March 2023. 
Page 207

Page 208

Annual Performance Report 2024/25   
7
Moray Integration Joint Board
4. Our Strategic Plan vision and priorities 
A key statutory duty of the Moray Integration Joint Board (MIJB) is to develop a
Strategic Plan which must be reviewed every three years. A refreshed strategic plan
was approved by the Board in November 2022. 
The integration of Children & Families and Justice Services into Health & Social
Care Moray under the direction of the MIJB is not yet reflected in the board’s
Strategic Plan. Work is ongoing to ensure appropriate governance of performance
reporting so that it can be included in future  MIJB Annual Performance Reports. 
The strategic plan sets the vision and local priorities that will help improve the health
and wellbeing of the people of Moray. It outlines how services will be delivered to
meet the National Outcomes for Health and Wellbeing, and achieve the core aims of
integration. 
Our Moray vision: 
“We come together as equal and valued partners in care to achieve the best health
and wellbeing possible for everyone in Moray throughout their lives.” 
The plan has three strategic priorities to be delivered on. 
Building Resilience – supporting people to take greater responsibility for their
health and wellbeing by: 
• focusing on prevention and tackling inequality;
• nurturing and being an integral part of communities that care for each other.
Home First – supporting people at home or in a homely setting as far as possible
by:
• working to give citizens of Moray the right care in the right place at the right
time;
• building communities where people are safe.
Partners in Care – supporting people to make choices and take control of their care
and support by: 
• working in partnership with all;
• listening to what citizens are telling us and being transparent in our decision
making and communications;
• ensuring we make a positive impact beyond the services being delivered.
The strategic intentions continue to focus on the triple aim of the national Health and
Social Care Delivery Plan which is summarised as: 
• Better Care: improving the quality of care by targeting investment at
improvement and delivering the best, most effective support;
Page 208

Page 209

Annual Performance Report 2024/25   
8
Moray Integration Joint Board
• Better Health: improving health and wellbeing through support for healthier
lives through early years, reducing health inequalities and focusing on
prevention and self-management:
• Better Value: increasing value and sustainability of care by making best use of
available resources, ensuring efficient and consistent delivery, investing in
effectiveness, and focusing on prevention and early intervention. 
The Strategic Delivery Plan was updated in May 2025 and sets out the actions that
will be taken forward to deliver on the strategic priorities. 
Transformation and improvement priorities 
A revised Strategic Delivery Plan for 2025 to 2028 was approved by MIJB in May
2025.  This plan incorporates the developments required to enhance our ability to
meet predicted future demands for services, whilst undertaking reviews of existing
models of care to ensure that the services provided are sustainable and fit for
purpose.  There are also projects to implement more efficient ways of working, to aid
in meeting the financial challenge that is impacting on all public sector organisations. 
A robust governance framework will be essential to ensure that projects can be
delivered within available resources and have a clear focus on outcomes. 
The work being progressed through the Rural Centre of Excellence led by the Digital
Health Institute (DHI) on research and development projects, and local delivery of
national programmes such as the Primary Care Improvement Plan (PCIP) and
Discharge without Delay (DwD) are key focuses and are incorporated into the
delivery plan.  DwD will encompass workstreams relating to frailty, delayed
discharges, and Getting it Right for Everyone (GIRFE) that are already underway. 
Rural Centre of Excellence 
Moray is leading the way in the development and testing digital solutions that could
transform how health and social care services are delivered and received nationally
and globally. 
The Rural Centre of Excellence (RCE) is a £5 million UK Government project, based
in Moray and led by the Digital Health & Care Innovation Centre as part of the Moray
Growth Deal. 
It brings together partners including Health and Social Care Moray and local citizens
to find better ways to support people’s health, wellbeing and independence —
especially in a rural setting like Moray — by creating digital tools and services that
are easy to use and accessible to everyone, regardless of income, location or digital
skills. 
The RCE is focused on solutions to everyday challenges identified by health and
social care staff, people who receive services and families. Early developments
include:
Page 209

Page 210

Annual Performance Report 2024/25   
9
Moray Integration Joint Board 
• Community Connections Moray: an easy to use online service directory to
help people find local support and information.
• Personal Data Store (PDS): a secure way for people to store and share their
health story with services, if they choose, so they only need to tell it once. 
In 2024/25, five ‘Living Lab’ projects have progressed. These are practical, real-world
trials where local people, staff, digital specialists and researchers work together to
design and test new ideas that improve care and free up resources. 
• Supported Self-Management & Long-Term Conditions Management: Focused
on healthy weight and diabetes, these projects have come together to create
the ‘Heart of Moray’ wellness community—a new approach to healthy living
supported by digital tools.
• Community Occupational Therapy Lab: Developing online tools to help people
find the right equipment and support more quickly, including a self-
assessment tool, and options for more efficient digital referrals and
assessments.
• Care in Place: Testing how the Community Connections and personal data
store tools can make life easier for unpaid carers, starting in Forres and
Lossiemouth.
• Smart Housing, Smart Communities Lab: Exploring how home sensors and
digital tech can help people stay safe and well at home, and alert carers or
services early if something seems wrong. Testing starts in Buckie in summer
2025.
• Mental Wellbeing: Now underway, this project focused on making it easier to
find mental health and wellbeing information and support through Community
Connections. 
Primary Care Improvement Plan 
Implementation of the Moray Primary Care Improvement Plan, in response to the
2018 General Practitioner (GP) Contract and accompanying Memorandum of
Understanding (MOU), is continuing.   A key aspect of the Plan is to provide support
to GPs by expanding the Multi-Disciplinary Team. 
Key areas of progress through 2024/25 were:
• Pharmacotherapy – established; every Moray GP Practice has some access
to all 3 levels; Level 1 (core), Level 2 (additional advanced) and Level 3
(additional specialist).
• Vaccination transformation programme – established;  all eligible vaccinations
have moved from GP practices to HSCM.  GP practices continue to assess
patients’ eligibility for certain vaccinations.  Travel vaccinations and all travel
health advise has now transferred to HSCM.
• Community Treatment and Care, Primary Care Occupational Therapy (Urgent
Care and intervention for prevention), Mental Health & Wellbeing Practitioners
Page 210

Page 211

Annual Performance Report 2024/25   
10
Moray Integration Joint Board
and First Contact Physiotherapy Services are all available at each Moray GP
practice. In addition to the Moray Primary Care Improvement Plan, the
Grampian GP Strategic Vision programme 2024-2030 brings together the
three HSC partnerships and NHS Grampian to address challenges around
transforming general practice into the sustainable service, which enables
people in their communities to stay well through the prevention and treatment
of ill health. 
The Vision programme focuses on a 10-point plan including a focus on modern
premises, integrated IT systems, data driven decisions and a robust education and
workforce development plan.  A Progress review recently undertaken shows that the
5 prioritized objectives are progressing well (Data; Digital; Multi-Disciplinary Team;
Models of contract; Premises). Consideration is now being given to the remaining
objectives.  An action plan outlining changes to the delivery of the objectives, the
steps and resources needed to move forward is being progressed 
Discharge Without Delay (DWD)
NHS Grampian and the three Health and Social Care Partnerships (Aberdeen City,
Aberdeenshire and Moray) are participating in the Scottish Government programme
that aims to reduce hospital length of stay and improve the overall patient journey by
facilitating timely and efficient discharge from hospital, through early and effective
planning for discharge and promotion of a “Home First” ethos.
The 4 workstreams of this national programme are:
• Planned date of discharge/integrated discharge hub – from point of admission
to hospital a realistic date and plan for discharge should be set by the multi-
disciplinary team to provide a focus
• Frailty at the front door – involves early comprehensive geriatric assessment
for identified frail older people as early as possible to ensure informed
discharge planning.
• Discharge to assess (D2A)/Homefirst – provision of responsive community-
based home care support that enables patients to return home without
unnecessary delays.
• Community hospital/step down rehabilitation units – to care for frail individuals
who require rehabilitation and extended assessments as part of their
discharge process, ensuring no delays.
The benefits will be reduced length of stay in hospital, improved patient experience,
improved hospital capacity and provision of appropriate care in a person’s preferred
setting.
The National DwD programme has completed phase one, which included the
completion of a National self-assessment tool, the creation of actions and the
identification of leads to represent Moray locally, regionally and nationally. The
Moray leads are now attending local, national and regional meetings and will develop
action plans for planned work which will be fed back to all groups.
Page 211

Page 212

Annual Performance Report 2024/25   
11
Moray Integration Joint Board
This is a collaborative approach in Moray and local leads for each of the
workstreams will work together with teams from DGH and HSC Morayto achieve the
goals set and it will build on the work already undertaken for the Frailty Pathway.
Moray’s DWD self-assessment has been submitted and has been added into a
single submission to Scottish Government from NHSG and will inform next steps.
Frailty Pathway
The 'Focus on Frailty' collaborative, facilitated by Health Improvement Scotland took
place between May 2023 and Nov 2024. Moray was one of six Health and Social
Care Partnerships who participated within the national collaborative. 
A combination of national events and webinars took place which led to Moray
designing a local frailty plan covering community and primary care through to acute
services. A Moray Frailty Strategic Group was put in place to oversee the delivery,
monitoring and evaluation of the local plan.  The Moray group worked closely with
Grampian colleagues and developed a Grampian Frailty Board to align planning
across the three health and social care partnerships. 
Much of the national collaborative work has now been subsumed into the national
Discharge Without Delay work. The Moray and Grampian Frailty groups continue to
meet periodically to continue to develop on the good work that took place during the
national collaborative. 
Areas of progress during 2024/25 include:  
• MEOC and Rockwood combined document used in a variety of
community settings such as vaccination clinics, health centres and
community hubs. Several other teams have now implemented this across
Scotland. Promoting a positive approach to aging well. 
• Identification of severe frail patients in two primary care settings; Culbin
Medical Practice and Maryhill Medical Practice. 
• Primary Care Occupational Therapy – EQ5D & Falls/Frailty programme
69% improvement.  Integration of Tai Chi into treatment programmes for
patients who are starting to become frail.
• Polypharmacy reviews by clinical pharmacist led to reduction in
prescribed medications, resulting in reduced risks of falls, 
• A dedicated frailty ward is now in place at Dr Gray’s Hospital; Ward 7.
• Education and awareness sessions in Dr Gray’s Hospital ward areas and
Emergency Department led by front line staff.
• Physiotherapist now full time permanent in the Emergency Department –
increased assessment of frailty, turn around and admission avoidance.
• Increased use of data from Health Intelligence to display at department
level.
• Application of “Super 6” to these patients.
• Document created and shared with the public regarding services available
to them in Moray – very well received and positive feedback gained.  This
Page 212

Page 213

Annual Performance Report 2024/25   
12
Moray Integration Joint Board
is now also available in the Emergency Department and shared with
patients identified as frail regardless of where they sit on the frailty scale.
• The licensing of an NHS Grampian version of the ‘The Broons’ frailty
comic strip first developed by NHS Highland.
• The introduction of a Frailty Icon has progressed but has not been
completed as yet.
• Bench marking of the Frailty Standard which were published in November
2024 
A quality improvement approach has been taken to this work, with successful tests of
change then being scaled up. Early evidence indicates a reduction in people being
admitted to hospital, a reduction in the length of time people are in hospital and a
reduction in readmissions. 
Getting It Right for Everyone (GIRFE)
Health & Social Care Moray became a partner within the national Getting it Right for
Everyone (GIRFE) programme in October 2023. GIRFE is a multi-agency approach
for health and social care services from young adulthood to end of life care. It builds
on the previous Scottish Government policy Getting it Right for Every Child
(GIRFEC). 10 partnerships were involved in work to co-design and test the principles
which will support the national approach to GIRFE and the development of a toolkit
to support staff to roll out and embed the approach. This work concluded in early
2025 and has been recently published. 
A Moray GIRFE Strategic Group has been formed and will continue to oversee the
embedding of GIRFE within Moray.
Key achievements in 2024/25 include: 
• Agreement that all newly commissioned services will require to demonstrate
how they will adhere to the GIRFE principles
• Ensuring GIRFE principles are embed in all new and updated polices and
strategic plans
• Promotion of GIRFE to health and social care practitioners and members of
the public
• Benchmarking of locality practice and performance against the GIRFE
principles
• Alignment of GIRFE plans across Grampian
5. Our continuing challenges 
Like all our community planning partners, we are ambitious for Moray. Already a
great place to live, work, grow and enjoy life in wonderful surroundings, we recognise
the importance of continued collaborative working with public sector bodies, third and
independent sector organisations, other key groups and agencies, to tackle
inequalities across Moray and improve the lives of residents and the services they
receive. 
Page 213

Page 214

Annual Performance Report 2024/25   
13
Moray Integration Joint Board
Our progress in improving health and wellbeing outcomes continues to be
challenged in many areas. Year on year, we have reported on the same issues of an
ageing population, inequalities in health, workforce shortages, growing pressures on
primary care and acute hospitals, and increasing reliance on unpaid carers. 
The cost of living crisis continues to impact on the health and wellbeing of children,
families and more vulnerable people.   
We are challenged to balance providing statutory services to meet people’s
assessed needs, offer choice and control in how their support needs are met and to
keep them safe in times of crisis, with also supporting them to manage their own
health and wellbeing and increase their independence to reduce their reliance on
formal support services. 
One of our greatest challenges remains our funding position. The MIJB is delegated
funding by both NHS Grampian and Moray Council to deliver the services for which it
has responsibility.  There are increasing pressures on the budgets of both partners,
with NHS Grampian under increased level of financial scrutiny. The increasing costs
of delivery of health and care (e.g. wage growth, national increases, costs of
medicines etc) mean that budgets continue to be under significant pressure. The
Financial Delivery Plan was implemented in 2024/25 where actions to achieve
savings and reductions in overspends were identified to ensure that the Board  can
operate within its financial resources.  Added to this, we continue to see growing
demand for services as the population grows and as more people live with and
experience ill health, frailty or other health and social care needs. 
The 2024/25 Annual Accounts, subject to audit, show an overspend on the provision
of services of £4.26m for the year ending 31 March 2025. Our financial performance
is detailed in section 10 of this report. 
It is recognised by the MIJB that there will be difficult decisions on how to allocate
resources to meet the need to streamline pathways or transform the way supports
and services are provided to make them sustainable and fit to meet future
challenges. 
Our key challenges identified in our Joint Strategic Needs Assessment include: 
 Population projections. 
Moray is projected to have an increasingly ageing population structure. Between
2023 and 2038 it is projected that the number of 5-17 year-olds in Moray will decline
by 19% (-11% for Scotland). Conversely, those aged 85 and over will increase by
63% in Moray and 47% in Scotland. 
Across all the over 65 age groups, the percentage growth in both males and females
is expected to be higher in Moray than Scotland. There is the potential for increased
demand for health and social care services with a limited workforce. 
 Inequalities 
Page 214

Page 215

Annual Performance Report 2024/25   
14
Moray Integration Joint Board
Although life expectancy is comparatively higher than the Scottish average, clear
inequalities are present: females in the most deprived areas of Moray have a 3%
lower life expectancy than Moray as a whole; males in the most deprived areas have
a 5% lower life expectancy than Moray as a whole.   
 Demand 
Some services have struggled to manage increase in demand due to a multitude of
factors such as the impact of the pandemic on health and wellbeing, staff fatigue,
and workforce challenges. 
 Workforce 
We have an aging workforce with a sizable proportion of staff potentially nearing
retirement as well as ongoing issues around recruitment and retention. 
 Mental health 
Data from General Practices in Moray shows depression is the second most
prevalent long-term condition recorded (4,005 patients) after hypertension. The
prevalence of depression risen between 2017/18 and 2022/23.  The rate per 1,000
population in Moray has increased from 42.5 to 53.7. 
The prevalence of dementia within the Moray population has increased from 4.9 per
1,000 population in 2017/18 to 5.6 in 2022/23.   
 Behavioural risk factors 
The three leading groups of causes of ill-health and early death in Moray are
cancers, cardiovascular diseases and neurological disorders. These groups of
causes account for 50% of the total burden of health loss. The largest differences in
burden - compared to Scotland - occur due to substance use disorders, digestive
diseases and cancers. A large proportion of cancer and cardiovascular disease is
preventable. 
Overweight, obesity and poor diet impact on health and wellbeing in a major way,
affecting 67% of people in Scotland.  Obesity is now the leading cause of death in
Scotland and is linked to 23% of all deaths. 
Smoking is the single biggest avoidable risk factor for cancer and remains a leading
cause of preventable disease and premature death. Alcohol is also recognised as a
contributory factor in many other diseases including cancer, stroke and heart
disease. 
 Armed Forces veterans
Veterans and service personnel have higher rates of certain health conditions, giving
rise to greater need for services than in the general population. These conditions
include mental health problems (e.g. PTSD, suicide, substance misuse); severe and
enduring physical health conditions (e.g. multiple, complex injuries; ongoing support
Page 215

Page 216

Annual Performance Report 2024/25   
15
Moray Integration Joint Board
through the national trauma network); impaired mobility and musculoskeletal
disorders; chronic pain.
The Moray area profile is included at Appendix A. 
6. Measuring our performance 
Performance management arrangements established within the partnership facilitate
overview and scrutiny of performance in relation to delivery of our Strategic Plan and
against a range of local and national key performance indicators. 
Quarterly performance reports are produced for HSCM management to review
performance and to determine actions required to address areas for concern or to
highlight areas showing improvement.  This information is further scrutinised by the
Senior Management Team and then reported to the MIJB’s Audit, Performance and
Risk Committee on a quarterly basis. 
National context 
The Scottish Government measures the performance of all health and social care
partnerships against a set of high-level statements of what we should be aiming to
achieve through integration and ultimately through the pursuit of quality improvement
across health and social care. 
The National Health and Wellbeing Outcomes provide a strategic framework for the
planning and delivery of health and social care services and they focus on the
experiences and quality of services for people receiving these services, carers and
their families. We have used this framework as the basis for our performance report. 
National Health and Wellbeing Outcomes 
1 Icon Health & wellbeing
People are able to look after and improve their own health and
wellbeing and live in good health for longer. 
2 Icon Living in the community
People, including those with disabilities or long term conditions, or who
are frail, are able to live, as far as reasonably practicable, independently
and at home or in a homely setting in their community. 
3 Icon Positive experiences
People who use health and social care services have positive
experiences of those services, and have their dignity respected. 
4 Icon Quality of life
Health and social care services are centred on helping to maintain or
improve the quality of life of people who use those services.
5 Icon Health inequalities
Page 216

Page 217

Annual Performance Report 2024/25   
16
Moray Integration Joint Board
Health and social care services contribute to reducing health
inequalities. 
6 Icon Support for carers
People who provide unpaid care are supported to look after their own
health and wellbeing, including to reduce any negative impact of their
caring role on their own health and well- being.
7 Icon Safe from harm
People using health and social care services are safe from harm. 
8 Icon Workforce
People who work in health and social care services feel engaged with
the work they do and are supported to continuously improve the
information, support, care and treatment they provide. 
9 Icon Use of resources
Resources are used effectively and efficiently in the provision of health
and social care. 
Our 2024/25 performance report looks at each of the Health & Wellbeing Outcomes
alongside national indicators. 
National Indicators (to be updated in July when figures are published) 
The Core National Indicators (Appendix B) have been developed from national data
sources to enable comparisons between Integration Authority areas and with
Scotland. Each indicator acts as a measure of progress against at least one
outcome. 
There are 23 indicators in total with four (10, 21,22 and 23) still to be defined.
Indicators 1-9 are taken from the Health and Care Experience (HACE) Survey which
is carried out nationally every two years.  They were provided in 2023/24 therefore
they are not due to be updated until 2025/26, so will remain the same as reported
last year. 
Page 217

Page 218

Annual Performance Report 2024/25   
17
Moray Integration Joint Board
7. Our performance in 2024/25 
Moray Core Suite of National Integration Indicators (to be updated in
July when stats are published) 
Health & Social Care Moray was in the top 50% for eight of the 19 reported
indicators for this reporting period.  This was a decrease from the previous reporting
period where 11 were in the top 50%.   
Areas of particular strength were in relation to lower premature mortality rate,
emergency admissions, emergency bed days, readmissions within 28 days and falls. 
There has been a significant reduction in the premature mortality rate (NI-11) and
emergency admission rate (NI-12) (per 100,000 population) in comparison to the
Scottish rate, with reductions of 25% and 29% respectively. 
Overall, we performed the same or better than Scotland for 12 of the 19 national
indicators, with seven performing worse than Scotland.  This is the same as the
previous reporting period. 
In the 2023/24 report we highlighted areas where there were reductions in
performance such as the percentage of adults supported at home who agree that
they are supported to live as independently as possible (NI-2) reduced by 7% and
the percentage of adults supported at home who agree they had a say in how their
help, care or support was provided (NI-3) which reduced by 10%.  Although the
difference between years cannot be directly compared due to the changes in
wording of the survey, and we were in line with Scotland, it was concerning that
these indicators seemed to have declined.  In addition, the fact that unpaid carers did
not feel adequately supported is very concerning. 
These indicators are only collated every two years so there is no update this year,
however there is a focussed effort to improve choice and control for people in how
their support is provided through increasing knowledge of and use of conversations
based on the principles of self-direct support (SDS), increasing knowledge of and
access to opportunities in the communities and through progression of the plan for
development of supports for the unpaid carers, described in the following pages. 
The detail of each of the indicators is included in Appendix B. 
Page 218

Page 219

Annual Performance Report 2024/25   
18
Moray Integration Joint Board
Summary of our performance at a glance - National Indicators
(HACE ones (1-9) will remain the same as the survey is only conducted every
second year) 
GREEN Our performance has improved compared to last year.
AMBER Our performance is similar to last year.
RED Our performance has got worse compared to last year. 
Please note that National Indicators 1-9 are based on the HACE survey which is
undertaken every two years.  2024/25 figures remain the same as reported in
2023/24 Annual Performance Report. 
Results for 2, 3, 4, 5,7 and 9 are not comparable to previous years due to changes in
survey wording. 
Outcome indicators 
National Indicator Scotland Our
result
Our
progress
1 Percentage of adults able to look
after their health very well or
quite well
91% 92% 
2 Percentage of adults supported
at home who agree that they are
supported to live as
independently as possible
72% 72% 
3 Percentage of adults supported
at home who agree that they had
a say in how their help, care or
support was provided.
60% 59% 
4 Percentage of adults supported
at home who agree that their
health and care services seemed
to be well co-ordinated
61% 66% 
5 Percentage of adults receiving
any care or support who rate it
as excellent or good
70% 69% 
6 Percentage of people with
positive experience of the care
provided by their GP practice
68% 69% 
7 Percentage of adults supported
at home who agree that their
services and support had an
impact in improving or
maintaining their quality of life.
70% 69% 
8 Percentage of carers who feel
supported to continue in their
caring role
31% 28% 
9 Percentage of adults supported
at home who agree they felt safe
73% 70% 
Page 219

Page 220

Annual Performance Report 2024/25   
19
Moray Integration Joint Board 
National Indicator(will be
updated in July)
Scotland Our
result
Our
progress
Data indicators
11 Premature mortality rate
(rate for 2023 not yet available)
442
(for 2022)
330
(for 2022) 
12 Emergency admission rate 11707 8338 
13 Emergency bed day rate 112883 87123 
14 Readmission to hospital within 28
days
104 77 
15 Proportion of last 6 months of life
spent at home or in a community
setting
89% 91% 
16 Falls rate  23 17.7 
17 Proportion of care services graded
'good' (4) or better in Care
Inspectorate inspections
77 81.1% 
18 Percentage of adults with intensive
care needs receiving care at home
65% 61% 
19 Number of days people spend in
hospital when they are ready to be
discharged
902 980 
20 Percentage of health and care
resource spent on hospital stays
where the patient was admitted in
an emergency
Not yet
available
Not yet
available 
Moray Local Indicators 
Performance in on target or within agreed tolerance in five of the 11 indicators. The
following is an assessment of performance in the areas not meeting target. 
The rate for attendance at the Emergency Department (ED) (Accident and
Emergency) is only slightly over target in March 2025. 
The number of people waiting to be discharged from hospital at census date (DD-01)
fluctuated through the year but ended with a high figure of 40. The number of bed
days occupied (DD-02) fluctuated through the year but was 1149 at Quarter 4 which
was a reduction in comparison to the same period in the previous year.  The 
contracted partner struggled throughout this year to accept new people for care
packages, but through working collaboratively with partner changes to funding
arrangements have been implemented recently resulting in recruitment of more staff
leading to an increase in hours available for new people requiring care, which will
contribute to reducing delays in discharges. 
Page 220

Page 221

Annual Performance Report 2024/25   
20
Moray Integration Joint Board 
Readmissions to hospital at 7 days of discharge has fluctuated through the year and
is just over target.  It is anticipated that the continuation of the focussed work around 
frailty at both the national and Moray levels will provide a reduction in presentation to
Hospital, within the frailty age groups. 
The percentage of patients starting psychological therapy within 18 weeks is not
achieving target. Some people remain in treatment for extended periods due to the
complexity of their illness and there are increased people requiring mental health
support that means that demand continues to outstrip resource with ongoing
uncertainty in relation to primary care funding for psychological therapies delivery. 
Group sessions are held, where appropriate, and further development should
ensure a greater throughput of people and ongoing job planning with professional
leads ensures that capacity is maximised across services. 
Moray is continuing to progress well with the implementation of the Medication
Assisted Treatment Standards (MATS) and early feedback indicates Moray
continues to meet the benchmarks set. 
NHS employed staff sickness absences have reduced significantly to 4.9%, the
lowest figure since April 2023.   Council employed staff sickness has increased to
8.2%.  The NHS figures is getting closer to the target of 4% but Council figures
remain well above target.  Staff absences continue to be at a high level with mental
health and muscular-skeletal injuries being the most common reasons.   
Mitigations to be added 
Page 221

Page 222

Annual Performance Report 2024/25   
21
Moray Integration Joint Board
The detail of each of the Local Indicators is included in Appendix C. 
Summary of our performance at a glance – Local Indicators 
GREEN Moray is performing better than target.
AMBER
Moray is performing worse than target but within agreed
tolerance.
RED
Moray is performing worse than target by more than agreed
tolerance. 
Indicator 2024/25
(Q4)
Target Progress
against
target
A&E attendance rate per 1000 population all
ages
22.0 21.9 
Number of Delayed Discharges (including
code 9) at census point
40 26 
Number of bed days occupied by delayed
discharges (incl. code 9) at census point
1149 850 
Rate of emergency occupied bed days for
over 65s per 1000 population
2681 2320 
Emergency admission rate per 1000
population for over 65’s
187 177 
Number of people over 65 years admitted as
an emergency in the previous 12 months
per 1000 population
131 121 
% Emergency readmissions to hospital
within 7 days of discharge
3.7% 3.9% 
% Emergency readmissions to hospital
within 28 days of discharge 
7.9% 8.4% 
% of patients commencing Psychological
Therapy Treatment within 18 weeks of
referral
65% 90% 
NHS Sickness Absence (%of hours lost) 4.9% 4% 
Council Sickness Absence (% of calendar
days lost)
8.2% 4% 
Page 222

Page 223

Annual Performance Report 2024/25   
22
Moray Integration Joint Board
8. Our progress and achievements in 2024/25 
Outcome 1: Health & wellbeing
People are able to look after and improve their own health and wellbeing and
live in good health for longer. 
National Indicators used to measure this outcome 
Indicator Title 2022 2023/24 2024/25
NI - 1 Percentage of adults able to look after
their health very well or quite well 
92.2% 
NI - 11 Premature mortality rate per 100,000
persons
330   
NI - 12 Emergency admission rate (per 100,000
population) 
8,338 
Comment to be added –and updated when figures received 
Community Appointment Day 
The aim of a Community Appointment Day (CAD) is to create the right environment
to enable clinicians to support people with their condition on the day and beyond,
learn about available local community services, embed personalised care and focus
on prevention.  With the intention of addressing increasing waiting lists by trialling a
new model of care, NHS Grampian delivered their first CAD in Moray for MSK
Physiotherapy and Podiatry patients. This was a new way of working, moving away
from treatment led health and delivering services differently by strengthening local
partnerships, particularly with communities, to enhance both patient and practitioner
experience.  There were 210 patients on the waiting list who were all invited, 162
opted to attend and 120 actually attended on the day. Patients were linked their own
online Personal Health Passport, which they completed as they moved around the
zones. Patients received a one-to-one consultation with the appropriate
clinician and were encouraged to have meaningful conversations about what matters
most to them.   
The CAD followed Realistic medicine principles, focusing on personalised and
values-based care.  The voice of lived experience was heard throughout the
planning process by involving the local Versus Arthritis Chronic Pain Group who
offered valuable feedback and guidance.   
19 community groups and partner services were in attendance to provide information
about the support available within the local community.  Bringing health and
community organisations together under one roof, allowed people’s health and
wellbeing to be viewed in full totality 
Preliminary Feedback was largely positive, indicating that patients felt the day had
been ‘enlightening’, benefited greatly from having services available in one place and
found out about what is available in communities.   
Page 223

Page 224

Annual Performance Report 2024/25   
23
Moray Integration Joint Board
High level analysis showed that patients particularly valued the focused time given to
them, being listened to what matters to them, having access to a one-stop-shop,
patient centred care and feeling informed.  Included in the patient evaluation was the
Collaborate tool; 78% reported that every effort was made to help them understand
their health issue, 74% reported that every effort was made to include what mattered
to them in choosing what they do next, 79% reported that every effort was made to
listen to things that mattered to them most about their health issues. Overall, patients
rated the experience 4.5 out of 5. 
60% of patients were either recommended a Patient Initiated Reviews within 6
months or fully discharged from the service.  Additionally, waiting lists dropped by
124 over a four-month period following CAD implementation, indicating a tangible
impact on service demand. 
Follow up interviews are ongoing in partnership with Health Intelligence colleagues,
and a final evaluation report is expected June 25. 
The MSK CAD recently featured as a good practice example in the Scottish
Government’s Realistic Medicine Casebook 
Heart of Moray
The majority of people in Moray are living with excess weight and a problem of this
scale needs a whole system approach which focuses on:
• Children, to give them the best start in life - they eat well and have a healthy
weight
• The food environment so it supports healthier choices
• Ensure people have access to effective weight management services that
meets their needs
• Leaders across all sectors promote healthy weight and diet
• Diet-related health inequalities are reduced
During 2024/25 the Dietetic team worked collaboratively with NHS Grampian, Moray
Leisure Centre and the Rural Centre of Excellence/ Digital Health and Care
Innovation Centre (DHI) to develop a whole system approach to addressing obesity. 
HSCM received some Scottish Government funding to enable better detection, early
intervention and management of overweight and obesity. 
The Heart of Moray launched in February 2025 and will build on pan Grampian
weight management work which has significantly increased weight management
provision in Moray through a range a interventions which span from Community
Connections/Heart of Moray (Heart of Moray – Improving health and wellbeing
together), Counterweight Core and exercise at Moray Leisure Centre, digital weight
management services with Second Nature and a new NHS Grampian Specialist
Weight Management Service. Public health teams will also be involved to deliver the
whole systems approach to obesity across all localities in Moray. 
Page 224

Page 225

Annual Performance Report 2024/25   
24
Moray Integration Joint Board
Heart of Moray – Improving health and wellbeing together
The Heart of Moray makes it easier to improve our health and wellbeing. It’s now at Moray
Leisure Centre, a community place with friendly staff, social spaces and ways to be more active,
learn about food and lifestyle and be supported for healthy weight management.
heartof.co.uk 
Making Every Opportunity Count (MeOC) 
Using the making every opportunity count (MeOC) approach to have light touch early
intervention and prevention conversations with people on lifestyle and life
circumstances is a key focus to help people manage their own health and wellbeing. 
This year saw the launch of updated booklet and accompanying digital resource
(webpage) for contact information for a variety of support services. Over 185 people
have been trained and 812 conversations were recorded during 2024/25, with people
accessing the supports they identified that met their needs. 
Ageing Well - Supporting older people to maintain their independence 
The Realistic Medicine Wellbeing Coordinators adapted existing resources to create
a tool with a focus on older people’s health concerns.  It support individuals to check
in on their health and be more aware of available support services.   
The MeOC self-check tool links with the Realistic Medicine approach, which supports
people using healthcare services to feel empowered to discuss their treatment, test
or procedure fully with healthcare professionals. The aim of this discussion is to
ensure people are aware that suggested treatment might come with side effects – or
even negative outcomes - and also to reduce harm, waste and unwarranted
variation.
Community Justice Groups
The Community justice social work team support the Ladies’ group RISE (Recovery
Inclusion Support & Energy) and the Men’s group: SWITCH (Skills Wellbeing
Inclusion Thrive Connection Hope) to meet weekly to progress a health & wellbeing
programme that compliments the ongoing support provided by the social work team.
The programme offers a holistic approach to health and wellbeing, introducing new
experiences and instilling confidence, motivation and encouraging access to
services. Those who attend these groups are currently under a supervision order
and attendance at the groups is voluntary and participation is growing with a steady
attendance throughout the year for RISE (with 36-40 attendees), and SWITCH has
seen an increase from 15 to 41 attendees.  Overall, 18 health and wellbeing
sessions have been facilitated through a collaboration of participants, social work
team and public health co-ordinator with a range of local third sector partners to help
build the programme.  Feedback from participants has been very positive and a
particular highlight was a fencing session.
Page 225

Page 226

Annual Performance Report 2024/25   
25
Moray Integration Joint Board
"we all had lots of fun fencing today and making music and photography a great
variety where everyone was able to get involved, total escapism". This session was
very much enjoyed by all, the coach leading was enthusiastic and motivated all
participants to give this a try and others who were unable to physically take part were
encouraged to be part of this.
Other general feedback;
“good guys, very engaging, easy to talk to”
“Really useful session, friendly trainer and a relaxed atmosphere let people feel ok to
give it a go”
"Very interesting & helpful. Enjoyed it though it felt a bit scary to start with"  
Leading healthy, active lives 
The Community Wellbeing and Development Team exists to prevent, reduce, and
significantly delay the need for long-term and residential care by enabling people to
maintain their independence and lead healthy, active lives.
The team supports a range of community health and wellbeing groups across Moray:
o 18 x B.A.L.L. Groups (Be Active Life Long Learning) These active ageing
groups are designed for older people and aim to support mobility, reduce the risk
of falls, and combat isolation and loneliness through regular physical activity and
social engagement.
o 4 x S.E.T. Groups (Seated Exercise and Tea A natural progression for some
B.A.L.L. participants, S.E.T. groups offer adapted seated exercises in a
welcoming setting, encouraging continued movement and community
integration.
o Health and Wellbeing Groups Specialist groups that support and improve
physical, emotional, and mental wellbeing. Delivered in partnership with health
professionals, these groups offer a follow-on option after rehabilitation sessions,
helping individuals build confidence, self-manage their health, and form new
community connections.
The team currently supports over 1,300 older people each week through these
activities, enabling them to stay active and connected in their communities.
Throughout the year, the team also works with external partners such as Wild Things
Environmental Education in Action to deliver inclusive “green space” activities that
promote mental health and wellbeing in nature.
In 2024, a key focus was engaging with the wider community to identify local service
gaps. One such gap was found in Portknockie, where—after multiple engagement
events—a new community-led social group, “Knockin-on Abit,” was established.
Run by the community, for the community, the group is helping reduce isolation and
bring people together in a rural location. 
Through the team's Information and Activities Booklet, people are supported to
access relevant local resources that promote wellbeing and independence. Over the
Page 226

Page 227

Annual Performance Report 2024/25   
26
Moray Integration Joint Board
past year, the Community Wellbeing and Development Team supported more than
2,500 older people to stay connected and active in their communities.
<Photos and permissions to be obtained > 
Social prescribing 
Whilst social prescribing continues to be delivered in Forres and Lossiemouth locality
the good progress in 2023/24 was impacted in 2024/25 by the Community Connector
services experiencing reducing staffing capacity which impacted the number of
referrals accepted and the data returned.  The Listening Service also ceased in April
2024 but restarted in Forres in March 2025. 
The impact of the staff reduction meant that there was a decrease of referrals of 210
(73% from previous year) from Forres and a decrease of 334 (57%) from Moray
Coast.  The majority of referrals were for smoking and weigh management, followed
by benefits advice, carer’s information, physical activity, mental health, Clan and
local support services. 
The aim is to scale up and implement social prescribing across other GP practices in
Moray and to explore digital possibilities to facilitate earlier intervention and
prevention, whilst acknowledging limited resources. 
Page 227

Page 228

Annual Performance Report 2024/25   
27
Moray Integration Joint Board
Outcome 2: Living in the community
People, including those with disabilities, long-term conditions, or who are frail, are
able to live as far as reasonably practicable, independently at home, or in a
homely setting, in their community. 
National Indicators used to measure this outcome 
Indicator Title
2023/24
NI - 2 Percentage of adults supported at home who agree that
they are supported to live as independently as possible 71.9%
NI - 3 Percentage of adults supported at home who agree that
they had a say in how their help, care or support was
provided
59.5%
NI - 5 Percentage of adults receiving any care or support who rate
it as excellent or good 68.7%
NI - 12 Emergency admission rate (per 100,000 population) 8,338 
NI - 15 Proportion of last 6 months of life spent at home or in a
community setting 91.1% 
Commentary on national PI 
Care at Home Service 
Care at Home is one of the key services which enables people to live independently
in their own home for longer. 
As at March 2025, the planned weekly hours of care being delivered by the internal
Moray Council service and CQS our external partner, were 4,672. 
Number of
planned
weekly hours
(March 2024)
Number of
planned weekly
hours 
(March 2025)
Change
in
hours
%
Internal Care at
Home
3,692 4008 +316 +8.56%
Partner provider 660 664 +4 -0.61%
TOTAL 4,352 4,672 -244 +7.35% 
A weekly care at home hub meeting is in place to manage performance and ongoing
challenges faced for each locality, to keep track of care provision.  Understanding
risks faced by those using services and providers assists with development of
strategies for improvement across the service. Performance information from these
meetings is submitted weekly to the Collaborative Care Home Support Team
Meeting which oversees provision of care at home and care homes by internal and
external services. 
A Strategic review of the approach for Care at Home service was undertaken and the
MIJB decided in March 2025 to develop a flexible framework approach intended to
grow availability of care provision.
Page 228

Page 229

Annual Performance Report 2024/25   
28
Moray Integration Joint Board 
Self-Directed Support 
The Self-Directed Support (SDS) team within HSCM continue to demonstrate a
strong and continued commitment to the principles of Self-Directed Support,
ensuring that people in Moray are empowered to live the lives they choose through
collaboration, innovation, and person-centred approaches. 
A key milestone has been the establishment of the SDS Standards Steering Group,
created to support the consistent embedding of the National SDS Framework of
Standards across local practice relating to children and young people, adults and
unpaid carers. This group brings together key stakeholders to ensure that the
principles of SDS are reflected in every aspect of support planning and delivery as
we progress. 
There has been a notable increase in the uptake of SDS Option 1 (Direct Payments)
enabling families to have more flexibility in managing their own support.  This has
been achieved through effective recruitment of Personal Assistants (PA’s) supported
by the SDS team, expanding the local workforce and providing individuals with
greater flexibility and control when choosing who supports them for personal care,
social support and support for unpaid carers to get a break from their caring role. 
Currently there are approximately 450 PA’s in Moray (increased from 415 last year),
supporting 284 people (compared to 301 individuals last year).  There was a
vacancy for a Social Worker for Unpaid Carers for most of the year which had an
impact on the number of people that could be supported to receive SDS as a Carer. 
The SDS Enablers ensure the SDS approaches are being used to support
individuals in achieving their personal outcomes through low-cost or no-cost
interventions wherever possible. This strength and asset, community based,
resource-conscious approach has helped individuals access support that is both
meaningful and sustainable. 
Ongoing efforts to develop a local framework of supports are progressing well. This
framework aims to ensure that everyone eligible for SDS has access to a wide range
of flexible, locally available options, strengthening true choice and control in line with
SDS legislation.  The Framework of Support will give transparency relating to cost
and service availability across Moray for those individuals who require support
funded through the four options of SDS. 
Communities and volunteer teams
In 2024–25, 107 Health and Social Care Moray volunteers, coordinated by the
Communities and Volunteering Team, gave over 9,000 hours of their time to support
people across Moray. The service is open to adults aged 18 and over, with the
majority of referrals relating to older people at risk of isolation and loneliness,
delayed discharge, or loss of independence. 
As demand continues to exceed capacity, the team has been reshaping volunteer
roles to deliver more responsive, place-based support that promotes early
intervention, prevention, and self-management. This includes two key pilot
Page 229

Page 230

Annual Performance Report 2024/25   
29
Moray Integration Joint Board
projects: the Welcome Home Service, offering short-term support following hospital
discharge, and Community Responder Teams, who provide practical help for people
with no local support. These responders play a key role in supporting the Home First
approach—helping to prevent unnecessary hospital admissions and enabling faster,
safer discharges. To better manage referrals and increase reach, the team is
developing localised cohorts of Volunteer Responders, moving away from one-to-
one matching. This shift enables faster, more responsive and flexible support where
it’s needed most. 
To help manage waiting times for the befriending service, the Moray Caller
Volunteer Service was expanded to offer regular phone contact for individuals
awaiting a befriender, where appropriate. This interim support ensures that those
referred continue to receive meaningful connection while awaiting face-to-face visits.
Meanwhile, Befriending Volunteers continue to provide in-person visits, with a
strengthened focus on helping individuals move from crisis to confidence, reconnect
socially, and participate more fully in their communities. 
<Photos and permissions can be obtained if needed> 
“Moving with Dignity” –  Proportionate Care 
Using a person-centred approach, respecting an individual’s abilities and
preferences, whilst minimising the need for multiple people to be involved in moving
and lifting is being adopted across services in HSCM.  Currently there are a number
of people with mobility issues, who currently require support from two people to
safely move them, and discharges from hospital can be delayed whilst awaiting
availability of carers to support them at home.   
A first cohort of staff have been trained in using specialist equipment, aids and
techniques and meet regularly to practice their skills and problem solve for individual
circumstances.  There is a plan to cascade training out to the wider assessment
teams and community hospitals in early 2025/26. 
Whilst a handful of cases are underway at present it is anticipated that adoption of
these principles will assist with discharges from hospital, as part of the discharge
process an assessment will be undertaken and individuals will have access to hoists
and other necessary equipment, which will also reduce the requirement for two
carers, releasing capacity for others. 
The Project team are focussing on rolling out training to local care teams to meet the
need of specific clients and more broadly across all care teams including other
partner care agencies. 
Page 230

Page 231

Annual Performance Report 2024/25   
30
Moray Integration Joint Board
Outcome 3: Positive experiences
People who use health and social care services have positive experiences of
those services, and have their dignity respected. 
National Indicators used to measure this outcome 
Indicator Title 2023/24
NI - 4 Percentage of adults supported at home who agree that their
health and social care services seemed to be well co-ordinated 65.7%
NI - 5 Percentage of adults receiving any care or support who rate it as
excellent or good 68.7%
NI - 6 Percentage of people with positive experience of care at their
GP practice 68.6%
NI - 17 Proportion of care services graded 'good' (4) or better in Care
Inspectorate inspections (to be updated) 81.1% 
Inspections
Many of our services are assessed by the Care Inspectorate to ensure that services
provided meet the required standards and peoples outcomes are being met. 
Appendix F provides details of all the inspections during 2024/25.   
Learning from complaints and feedback 
We place huge importance on using the comments and feedback we receive to
continuously improve the quality and safety of services. As well as the feedback
received directly by services and gathered via surveys conducted as part of monitoring
the quality of services and service redesign, another source of information and learning
is obtained from complaints received. 
A total of 138 complaints were received by Health and Social Care Moray in 2024/25. 
We record all complaints received onto either the DATIX system for health related
services or LAGAN for social work and social care related services.   
It should be noted the figures reported for 2023/24 onwards include Children &
Families and Justice Social Work Services, as these services were delegated to the
Moray Integration Joint Board on 16 March 2023.  This accounts for the increase in
complaints recorded on Lagan from 2023/24 onwards. 
The number of complaints recorded in DATIX include the Out of Hours Primary Care
Service (known as GMED) for the whole of Grampian, not just Moray.  This is
because the Moray Integration Joint Board host this service for the whole Grampian. 
The GMED service cares for patients who have urgent care needs and cannot wait
until their GP Practice is open. GMED operates 18:00 until 08:00 each weekday, all
weekends and each public holiday including the festive period. The services has on
average 90,000 contacts annually (1/6 of the Grampian population).   
Page 231

Page 232

Annual Performance Report 2024/25   
31
Moray Integration Joint Board 
In 2024/25, 23% (27) complaints were upheld fully, with the remainder being partially
or not upheld. 
Aspects of services leading to complaints were around processes not being clear or
not being followed appropriately by staff, communication issues relating to messages
or guidance not being sufficiently clear for people and the right people not having
been informed at the right time. 
HSCM governance structures allow ongoing review of complaints and incidents to
identify areas for improvement and learning opportunities, to drive positive change. 
It is positive to note that complaints regarding provision of care are small in number
and that very positive feedback is regularly received from people receiving support
from services 
When a complaint is straightforward and does not require investigation, we aim to
respond within 5 working days (often called frontline or early resolution complaints)
but when an investigation is required, we aim to respond to complaints within the
target of 20 working days. Performance during 2024/25 did not always achieve these
targets. An average of 25 working days for frontline complaints and 51 working days
0
20
40
60
80
100
120
140
160
2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
Complaints Received by Year
Datix Lagan Combined
Year  Number
recorded in DATIX
Number
recorded in LAGAN
Total complaints
2019/20 62 25 87
2020/21 33 32 65
2021/22 68 24 92
2022/23 78 30 108
2023/24 67 80 147
2024/25 71 67 138
Page 232

Page 233

Annual Performance Report 2024/25   
32
Moray Integration Joint Board
for investigative complaints for social work and social care services were recorded.
For health related services there was an average of 3 working days for early
resolution complaints and 45 working days for investigative complaints. This is an
area for improvement and processes internally have been reviewed to ensure they
are as streamlined as possible. 
Outcome 4: Quality of life
Health and social care services are centred on helping to maintain or improve the
quality of life of service users. 
National Indicators used to measure this outcome 
Indicator Title 2023/24 
NI - 6 Percentage of people with positive experience of care
at their GP practice 68.6% 
NI - 7 Percentage of adults supported at home who agree
that their services and support had an impact in
improving or maintaining their quality of life
69.3% 
NI - 12 Emergency admission rate (per 100,000 population) 8,338   
Narrative to be added – when figures received 
Day opportunities 
The Day Opportunities Team continues to play a vital role in enhancing quality of life
for individuals and their carers. By facilitating access to social activities and
meaningful engagement, the team has supported both individuals and unpaid carers
in achieving greater wellbeing. These opportunities have also provided much-needed
respite for carers, contributing to their ongoing sustainability and resilience.
The work of the Day Opportunities SDS Enablers has received regular and positive
feedback from families and individuals who have benefited from their support. This
feedback reflects a high level of satisfaction and underlines the impact of enabling
roles in promoting choice, independence, and tailored outcomes.  Such feedback
includes “so happy with the supports put in place, feel like my wishes were listened
to” highlighting the value individuals place on being fully engaged in the creation of
their support.  Further feedback includes “in the short time I have known you I can’t
believe how much you have done for us which has really benefitted my mental health
and wellbeing.  B loves the Bosie, the choir and hopefully she will get to the darts
club and craft group shortly.  All supported by you” and "I'd be lost without the
support, it's fine to get out of these 4 walls.  It’s nice to get a chance to go to places
in Elgin, as I don't have a chance otherwise". 
Housing developments
Our strategic vision for LD housing in Moray is clearly articulated in the strategic
plan. We are committed to sustainable accommodation through continued
Page 233

Page 234

Annual Performance Report 2024/25   
33
Moray Integration Joint Board
collaboration with partners to develop long-term supported housing for individuals
with learning disabilities. Additionally, we aim to provide tenancy support to help
individuals and families establish and maintain tenancies in appropriate settings,
thereby reducing the risk of inappropriate placements or care breakdowns. We are
also working to integrate LD housing needs into the broader housing policy,
specifically the Local Housing Strategy (SHIP). 
Over the previous year, the Partnership, led by the LD service, has been
collaborating with Moray Council Housing Dept, Grampian Housing Association, and
Springfield. Together, we have been planning and building flats and bungalows
specifically for people with Learning Disabilities. Excitingly, the bungalows are due
for occupation in July 2025. 
Outcome 5: Health inequalities
Health and social care services contribute to reducing health inequalities. 
National Indicators used to measure this outcome 
Indicator Title 2022 2023/24 2024/25
NI - 11 Premature mortality rate per 100,000
persons 330 
NI - 12 Emergency admission rate (per 100,000
population) 
8338 
Narrative for indicator to be provided once update in 
The Joint Strategic Needs Assessment, which helps us understand the current and
future health and wellbeing needs of the local population and identify future priorities,
was completed and approved in September 2024. 
Throughout 2024/25, HSCM continued to prioritise actions to address health
inequalities and improve equity of access to care for all population groups, in
alignment with the Public Sector Equality Duty and our Strategic Plan. 
Our Healthpoint service expanded its outreach activity, delivering 2,363 individual
contacts across Moray through community-based campaigns and pop-up events.
Key campaigns included Nutrition and Hydration Week, which engaged older adults
in supported housing and care settings, and Ageing Well presentations delivered to
10 community groups with 237 attendees. These initiatives not only promoted
physical wellbeing but also tackled social isolation which is a key determinant of poor
health. 
Smoking cessation services reached increasing numbers of individuals. 
• 104 smoking quit attempts were recorded in 2024/25, with 24 successful 12-
week quits.
Page 234

Page 235

Annual Performance Report 2024/25   
34
Moray Integration Joint Board
The Walk Moray programme continued to improve physical activity and reduce
isolation. In 2024/25, 19 health walks, including evening and dementia-friendly
walks, attracted 122 new walkers and maintained an average of 100 participants per
week thanks to the support of 101 volunteer walk leaders. Feedback highlighted
improvements in confidence, mobility, and social connectedness. 
A multiagency assessment tool that identifies neglect and promotes early
intervention to improve outcomes for families has been implemented. The Health
Visiting and Family Nurse Partnership (FNP) teams are referring families to the
council’s income maximisation team to ensure they are accessing the financial
support they are entitled to. 
Through current Scottish Government funding, a local plan is in place to increase
the qualified school nursing staffing establishment. The school nursing role focuses
on prevention, early intervention, and support for the most vulnerable children over
five years old. 
The School Nurse Pathway in Moray includes specific measures to identify and
support young carers. Nurses respond to referrals, contribute to the child's
chronology, and carry out wellbeing assessments using the GIRFEC National
Practice Model. They coordinate health-related aspects of the child’s plan, alert
relevant professionals, and link families to appropriate children’s and adult services. 
Making Every Opportunity Count (MeOC) is a health promotion approach that
encourages colleagues to leverage everyday interactions to support individuals in
making positive changes to their physical and mental health. In 2024/25, 185 new
starts with the Care at Home Service received MeOC training as part of their
induction. 
We extended our support to unpaid carers through development of Adult Carer
Support Plans and embedded young carers into the School Nurse Pathway. 
Funding mechanisms such as the Health Improvement Fund and Third Sector Winter
Support Fund provided nearly £25,000 in 2024/25 to community-led projects focused
on healthy eating, financial inclusion, and local wellbeing initiatives. 
Service users with lived experience played a central role in shaping mental health
service improvement. The Making Recovery Real partnership and collaboration with
Moray Wellbeing Hub led to peer integration in mental health wards and influenced
contract awards. 
Through participation in the National Frailty Collaborative, HSCM co-developed a
Frailty Action Plan to promote early identification and prevention, and support people
to age well in their communities. 
Over the past year, we have made significant strides in the delivery and development
of the Learning Disability Annual Health Checks programme across Moray. Following
the resounding success of an initial small-scale trial in Aberlour, of one nurse a day a
week over six weeks, a proposal was taken forward to fund a community-based
model by recruiting a nurse within the Learning Disability Team. This nurse is now
Page 235

Page 236

Annual Performance Report 2024/25   
35
Moray Integration Joint Board
rolling out the Health Check to everyone with a diagnosed Learning Disability,
ensuring that all are offered a check. 
Looking forward 
The 2025-2029 Equality Outcomes have now been set by the Board. 
1. Provide accessible services that support people to remain safe in their own
homes through person-centred care and digital transformation.
2. Unpaid carers will be given choice, opportunities, and support to care for their
loved ones, ensuring their well-being enabling them to balance their caring
responsibilities with their personal lives.
3. Support people with learning disabilities and their families in maintaining their
health and wellbeing and establishing tenancies in new supported
accommodation.
4. Continue to embed LD Annual Health Checks with a focus on early detection
of health issues, improved health outcomes, enhanced access to healthcare,
personalised health action plans, and reducing health inequalities for
individuals aged 16+ with learning disabilities.
5. Support children and young people affected by their own or someone else’s
drug or alcohol use. Ensure they can easily access support from their school
and other services, and that families are supported to find their own recovery.
6. Support hub and outreach efforts in disadvantaged communities through
tackling poverty, income levels, poor housing, and disadvantage to help
individuals avoid substance use. Expand efforts to other areas, including
school talks, online conversation café, education and drug awareness, and
naloxone training.
7. A full redesign of adult day services will enable individuals to access day
support that is person-centred and meets their agreed outcomes and
aspirations. Where appropriate, day services will be provided within people’s
own communities.
8. Prioritise the health and well-being of all staff by providing opportunities for
personal well-being, development, and learning in a supportive and inclusive
work environment. 
Page 236

Page 237

Annual Performance Report 2024/25   
36
Moray Integration Joint Board 
Outcome 6: Carers are supported
People who provide unpaid care are supported to look after their own health and
wellbeing, including reducing any negative impact of their caring role on their own
health and well-being. 
National Indicators used to measure this outcome 
Indicator Title 2023/24 2024/25
NI - 8 Percentage of carers who feel supported to
continue in their caring role 28.2% 
NI - 18 Percentage of adults with intensive care needs
receiving care at home 60.6% 
Narrative to be added re indicators 
The work that is described below is intended to improve these results, however given
the increasing older people population in Moray, the level of need is likely to increase
significantly, with no additional funding available to increase capacity for support,
being able to provide support everywhere it is needed, will be an increasing
challenge. 
Unpaid carers 
Unpaid carers can be any age, from young people to older people, with Carers UK
predicting 3 in 5 of us will be a carer at some point in our lives.  There are an
estimated 16,200 unpaid carers in Moray.  Not all unpaid carers in Moray require
formal support from statutory services to assist them to meet the demand of the role,
or to receive formal support for the person they care for, however, carers legislative
rights are enshrined by the Carers (Scotland) Act 2016. 
During the 2024–2025 period, there has been steady, positive progress in the
development and implementation of Moray’s Unpaid Carers Strategy. The focus has
remained on enhancing awareness and recognition of unpaid carers across Moray.
A key initiative is the ongoing promotion of the Moray Carer Aware campaign. This
campaign aims to improve the identification and recognition of unpaid carers and
includes the development of a proposed badge and ID card. Public engagement is
planned to gather feedback and ensure the initiative aligns with carers' needs and
preferences.
A pilot project with Elgin Health Centre has introduced a carer awareness training
programme. This bespoke training was aimed at increasing staff knowledge and
ability to identify unpaid carers and has led to a rise in the number of carers recorded
in the GP system. This programme is part of a broader unpaid carer pathway
designed to enhance identification, recording, and referrals to appropriate support
services.
As of March 2025, there were:-
Page 237

Page 238

Annual Performance Report 2024/25   
37
Moray Integration Joint Board
• 1188 adult carers registered with the service, of which there were 58 new
adult carers referred to the service between Jan -March 25.  19 carers are
receiving intensive support during this period.
• 198 young carers registered with the service, of which there were 45 new
young carers referred to the service between Jan-March 25.  1 young carer is
receiving intensive support during this period.
The Unpaid Carers Team also participated in the most recent Moray Integrated Joint
Board (MIJB) development session. In collaboration with Quarriers, the
commissioned carer support service, and with contributions from two young carers
and an adult carer, the session provided valuable insights from lived experience and
further supported awareness raising efforts.
Access to day opportunities for cared-for individuals continues to be a vital form of
support for unpaid carers, offering them essential breaks from their caring role.
These opportunities help unpaid carers manage their mental health by giving them
time to focus on their own well-being, reducing feelings of stress and isolation. The
Day Opportunities team supports both the unpaid carer and the cared-for person in
engaging with the community and creating space for meaningful breaks. This dual
approach positively impacts the mental health and well-being of both parties.
A testimonial from an unpaid carer supported by the Day Opportunities SDS
Enablers in January 2025 stated: "Everything’s fine since Day ops got involved. I can
go to Elgin or Tesco. I can get a haircut without worrying. The care side of support is
good, but when the social side of it started, I felt a bit free. I know my wife is safe
when I am not here.”
The Day Opportunities team continues to offer weekly support through a person-
centred, strengths-based approach aimed at delivering positive outcomes.
Quarriers, as the commissioned carer support provider, plays a central role in
promoting the mental health and well-being of unpaid carers through a wide range of
tailored support services. These include:
• Free professional counselling services to help unpaid carers manage stress,
anxiety, and emotional strain related to their caring roles.
• Sound therapy and art therapy sessions, which offer creative and holistic
approaches to relaxation and mental health support.
• Time to Live Short Break Awards, which allow unpaid carers to take
restorative breaks tailored to their personal needs.
• Respite break options, such as vouchers for activities like afternoon tea or
play sessions, offering informal and enjoyable respite.
• Hand massage workshops, which teach practical relaxation techniques to
help carers manage day-to-day stress.
• Monthly carer drop-in sessions, which provide a welcoming space for carers
to connect, share experiences, and receive advice and support.
Together, these services and initiatives represent positive steps toward improving the
recognition, support, and well-being of unpaid carers across Moray.
Page 238

Page 239

Annual Performance Report 2024/25   
38
Moray Integration Joint Board
Outcome 7: People are safe
People who use health and social care services are safe from harm. 
National Indicators used to measure this outcome 
Indicator Title 2023/24 
NI - 9 Percentage of adults supported at home who agree they
felt safe 70% 
NI - 11 Premature mortality rate per 100,000 persons 330  
NI - 14 Emergency readmissions to hospital within 28 days of
discharge (rate per 1,000 discharges) 77 
NI - 16 Falls rate per 1,000 population aged 65+ 17.7   
Add narrative once data updated 
Falls Pathway 
To continue the focus and significance of addressing falls risks, a review of falls
pathway was undertaken in collaboration with Scottish Ambulance Service. A test of
change is planned to ensure multifactorial falls screening takes place at the earliest
opportunity. Falls awareness and prevention groups have been held and run by the
Primary Care Occupational Therapy service in sheltered housing and at The Oaks. 
Adult Support and Protection 
In 2024 a progress review by the Adult Support and Protection Joint Inspection Team
was undertaken in Moray. The progress review was a follow up from our 2022 Joint
Inspection where a number of improvement areas were highlighted as part of the
report. 
Moray made significant progress in all the identified areas for improvement within the
progress review. Inspectors also told us that in some areas of work, for example in
the use of chronologies, we had made some of the best progress that they had seen
across the country. 
The significant level of improvements made are testament to the hard work,
dedication and expertise of frontline staff, managers and leaders across Moray
Council, Police Scotland, NHS Grampian and our Voluntary Sector Partners who
make up the Adult Protection Partnership in Moray and who form the governing body
of Moray’s Adult Protection Committee (APC). 
Page 239

Page 240

Annual Performance Report 2024/25   
39
Moray Integration Joint Board
The Review found that Moray had made significant progress in all seven areas
recommended in the 2022 joint inspection. The full report from the Care Inspectorate
was published on 29th October 2024 and can be found here. 
Key findings included: 
• Consistent application and delivery of key processes. Practitioners were
noted to be confident and highly professional and followed the multi-
agency adult support and protection procedures meticulously 
• Investigations were carried out for all adults at risk who required them.
Almost all Investigations were rated good or better (85%). 
• Adults at risk of harm had in place a Chronology. 80% of Chronologies
were rated good or better, which is a significant improvement from 39%
in 2022. 
• The Quality of Risk Assessments and Protection Plans had improvement
significantly 
• Case Conferences were found to be carried out effectively. The right
people from partner agencies prioritised attendance. Almost all Case
Conferences were rated good or better for quality. 
• Initial Referral Discussions (IRDs) were found to be of an exemplar for
the sector
• The Adult Protection Committee (APC) and Chief Officers Group (COG)
exercised sound and effective multi-agency governance over the
delivery of improvements to adult support and protection 
• The partnership had a cohesive programme of multi-agency audits and
quality assurance activities. These included involvement from front line
practitioners.   
The below table evidences the significant progress Moray has made in relation to
key processes comparing the findings of the 2022 Joint Inspection to the Progress
Review 2024. 
Process  2022 Inspection  2024 Progress Review 
Chronology presence  27% 100%
Chronology quality – good
or better 
39% 80%
Risk Assessment
presence 
56% 68%
Risk assessment quality –
good or better 
75% 100%
Protection plan presence  68% 90%
Protection plan quality –
good or better 
64% 80%
Page 240

Page 241

Annual Performance Report 2024/25   
40
Moray Integration Joint Board
Investigation presence  48% 100%
Investigation quality –
good or better 
52% 85%
Case Conference quality
– good or better 
83% 91% 
The direction of the APC over the next two years will be based on the below main
areas for development alongside activities within our Multi-Agency Improvement
Plan. 
As a partnership, we recognise that we still have a distance to travel. However, we
are proud of the journey thus far and the progress made over the last two years and
know that adults at risk of harm are safer as a result of the work we undertake. 
The table below highlights areas of work we will focus on in the coming two years. 
Area for Development  Where We Want To Be  How Will We Get
There? 
Involving the Adult in a
Trauma Informed Way 
Have in place a trauma
informed workforce for
ASP in Moray 
Grampian wide
programme of work for
Trauma Informed ASP
activity currently in
progress. 
Chronologies  All practitioners carry out
good quality
chronologies and discuss
information within
meetings alongside the
Adult 
Suite of multi-agency
training and guidance
devised and carried out. 
Strategic Resourcing  ASP in Moray to be fully
resourced 
On going discussion at
COG and APC to
highlight risk. 
Quality Assurance
Activity 
Have in place a clear
suite of multi-agency and
single agency audit
activities that support in
monitoring evaluating
and improving ASP in
Moray 
Audit and Quality
Assurance yearly
timetable devised and
followed – with full
participation of all
partners 
Monitoring of commissioned services 
A particular strength of the Adult Social Care Commissioning team continues to be
the proactive and reactive monitoring of contracts. The team have developed the
monitoring process in the last financial year by including a second formal contract
meeting for each provider as well as a monthly informal meetings. This ensures that
relationships with providers remain strong, and they are well supported.  The
Page 241

Page 242

Annual Performance Report 2024/25   
41
Moray Integration Joint Board
commissioning team also lead a Learning Disability Provider Forum that meets 4
times a year with specific themes and guest speakers.  In 2024/25 the themes were
recruitment, care inspections, advocacy and staffing structures, including the
Support Worker role. 
In 2024/25, the Commissioning Team were required to respond effectively to
undertake enhanced monitoring for 5 external services and one internal service. 
These were required as a result of concerns raised by social work teams, from an
annual site visit or a poor Inspection from the Care Inspectorate.  Each of these
enhanced monitoring programmes ensured a return to the required standards and
resulted in delivery of services to meet outcomes for people, improved Care
inspections or improved processes for the provider. 
Urgent health care out of hours
GMED is the Grampian-wide out of hours primary care service that cares for patients
who have urgent but non-life threatening health needs that cannot wait until their GP
practice is open. GMED is not an emergency service, a minor injury service or a
walk-in service.  To access urgent care services, patients need to call 111 (NHS 24)
who will triage the patient and refer to the most appropriate service, including GMED.
Community pharmacies, Scottish Ambulance Service (SAS), community nursing,
social work and some other services can refer patients directly to the dispatch hub
via the professional-to-professional telephone line.
In 2024, GMED dealt with 107,608 cases which was a 4% decrease in demand
compared to the previous year (112,148). There were: 
• 58,634 advice calls, 
• 34,656 centre consultations, 
• 11,128 home visits and 
• 3,190 mental health advice calls 
However, if we compare the activity levels from 2020 (pre-Covid) there has been in
increase in activity of 35.6% or 79,358 cases which is significant. 
GMED Activity Heat Map
The heat map shows the demand in all locations across NHS Grampian in 2024. 
Elgin, Forres and Buckie are the busiest locations in Moray.
.
In 2024 the service had 24,329 contacts in Moray which represents 22.6% of all
GMED activity, compared to 2020 (pre-COVID), when there were 19,488 contacts
(24.6%) of all GMED activity.  This demonstrates that even though the number of
overall contacts has increased in Moray, as a percentage of GMED activity it has
slightly reduced. 
Page 242

Page 243

Annual Performance Report 2024/25   
42
Moray Integration Joint Board 
GMED is a successful gatekeeper for secondary care services. In 2024, we have
admitted 6049 patients to the hospital, this shows a decrease of 19.5% compared to
the previous year (7510) and by 31.4% pre-Covid (8822). 
8822
7510
6049
0 2000 4000 6000 8000 10000
Hospital Admissions
2024 2023 2019
Page 243

Page 244

Annual Performance Report 2024/25   
43
Moray Integration Joint Board 
Outcome 8: Engaged workforce
People who work in health and social care services are supported to continuously
improve the information, support, care and treatment they provide, and feel
engaged with the work they do. 
National Indicators used to measure this outcome 
There are no National Indicators to measure our progress towards this outcome. Our
performance is in part measured using staff surveys. 
Feedback from Inspections
The feedback from Care Inspectorate highlights how engaged staff are in the support and care
they provide, as evidenced in section 8 of this report, examples:- 
ASP inspection - “Robust measures were in place to identify concerns early and
promptly implement remedial action. Operational managers worked diligently and
effectively to bring about necessary improvements to adult support and protection”. 
START – “People enjoyed support which was dignified and respectful. Staff felt
supported by their supervisors and colleagues”. 
Moray Supported Lodgings project – “Young people benefit from leading and
directing their own support within a multi-agency approach to care planning” 
Community Support Services – “People were supported by staff who were kind and
caring” 
Staff survey 
The iMatter is an annual staff survey sent to all employees across health and social
care in Grampian. During 2024/25 there was 56% response rate showing an
employee engagement index of 77, and overall score of 7.1 which were similar to the
previous year. 
Responses with the lowest scores were: “I feel the board members who are
responsibility for my organisation are sufficiently visible”, “I have confidence and trust
in Board members who are responsible for my organisation”, “I have sufficient
support to do my job well” and “I am confident performance is managed well within
my organisation”.   There has been more information shared via newsletters and
briefings during 2024/25 so it is hoped that this will have an impact on future scores.  
Feedback for the current year survey is expected in June 2025 which will inform
priorities for our Workforce Plan. 
Workforce Forum 
Page 244

Page 245

Annual Performance Report 2024/25   
44
Moray Integration Joint Board
The Workforce Forum provides an opportunity for open dialogue between workforce,
partnership and health and safety representatives, and enables colleagues to
discuss and raise issues and best practice.  Attendance at these meetings has
increased significantly which is positive as more teams are now represented and
engaged.  During 2024/25 several discussions have been around difficult to fill
vacancies and how these are managed. 
Personal & Social Care was the only job family to fall below the 90% stability target,
with a stability rate of 83.3%.  Alongside Admin services this is an area where we
would anticipate there to be greater turnover as people develop experience and skills
and then seek higher grade jobs.  More stringent vacancy controls have been
implemented across NSHG and this has led to fewer new starts during January 2024
to January 2025 which therefore increases figures of stability as there are less
workforce with less than one year service. 
Workforce Stability across NHS employed teams 
Between February 2024 and January 2025, Moray H&SCP experienced a turnover
rate of 9.18%, higher than the NHSG turnover rate of 7.46% for the same period. A
turnover rate of around 10% is typically expected, suggesting that lower figures
indicate a stable workforce. 
Absence actions and Wellbeing Initiatives 
Absence is monitored by all teams across the partnership and is governed by the
application of the attendance policies of NHS Grampian and Moray Council. 
Across Health and Social Care Moray, sickness absence occurs across all staff
groups, however there are elevated rates in nursing and social work, and provider
services in particular. This is in part due to workload, exposure to infection and travel
impact on an ageing work population.  The most common long term sickness are
related to Mental Health or Muscular-skeletal injuries and we have a number of
wellbeing initiatives to help combat and recognise stress and general physical
wellbeing.   
Page 245

Page 246

Annual Performance Report 2024/25   
45
Moray Integration Joint Board
• Wellbeing features as a regular standing item at our Workforce and Health
and Safety groups where two way flow of information is encouraged with peer
to peer support and appropriate escalation where necessary. Moray Council
has mental health first aiders which have proved a very useful resource.
• Peer to peer support has been established and  some teams have a wellbeing
weekly get- together, known as ‘Wellbeing Friday’. Other teams such as our
AHP services operate a 30 minute ‘wellbeing window’ weekly where they will
actively take a break and do something physical such as walking or stretching
or yoga. 
• Collaboration with Moray Council and NESTRAN Health & Transport Action
Plan for Grampian in promoting ‘active travel’ campaigns. 
• Promotion of the ‘At your best with Rest’ campaign to encourage staff to take
their allocated breaks to increase efficiency and reduce fatigue and burn out.
Some services have dedicated break areas and set times which allow the
whole team to take a break together. Other teams have established a virtual
tea break which has been very successful. We are very well supported by our
Wellbeing colleagues in Grampian and the ‘We Care’ resources. 
• Promotion of flexible and hybrid working where appropriate. 
• Through ‘We Care’ we have a Covid Reflection listening service available as
well as Recovery in Mental Health, Relaxation workshops and stress
awareness training available to all. 
• We have an active Menopausal awareness programme, which offers training
and tea and talk sessions. 
Page 246

Page 247

Annual Performance Report 2024/25   
46
Moray Integration Joint Board
Outcome 9: Use of resources
Resources are used effectively and efficiently in the provision of health and social
care. 
National Indicators used to measure this outcome 
Indicator Title 2023/24
NI - 4 Percentage of adults supported at home who agree that their
health and social care services seemed to be well co-
ordinated
65.7%
NI - 14 Emergency readmissions to hospital within 28 days of
discharge (rate per 1,000 discharges) 77 
NI - 15 Proportion of last 6 months of life spent at home or in a
community setting 91.1%
NI - 16 Falls rate per 1,000 population aged 65+ 17.7 
NI - 19 Number of days people spend in hospital when they are
ready to be discharged (per 1,000 population) 980 
Commentary to be provided once data updated. Indicators 14-19 to be updated in
July. 
Vaccination uptake 
The World Health Organisation (WHO) describes vaccines as one of the two public
health interventions that have the greatest impact on the world’s health, the other
being clean water. It is also considered as one of the most impactful and cost-
effective public health interventions available to communities and populations across
the world. 
Vaccination can prevent or reduce the severity of disease, minimise disability and
save lives, often in many of the most disadvantaged people in society. It offers
excellent value for money by reducing current and future public expenditure on
health and social care provision. 
Uptake of seasonal flu and covid-19 vaccinations in Winter 2024/25 was similar in
Grampian to elsewhere in Scotland and highest in the oldest age groups, and the
Spring 2025 programme continues to perform well. Uptake shows a socioeconomic
gradient with highest uptake amongst least deprived. 
COVID 19
Cohort % uptake
2023
% uptake
2024
Age 65 to 74 77.0% 65%
Aged 75+ 83.9% 75%
All social care workers 14.5% 6%
At risk age 5 to 11 7.3% 7%
At risk age 6 months to 4 years 13.6% 13%
At risk age 12 to 64 35.8% 25.2%
Page 247

Page 248

Annual Performance Report 2024/25   
47
Moray Integration Joint Board
Frontline health care workers 30.2% 19%
Older people care home residents 87% 83%
Weakened immune system 59% 38%
TOTAL 60% 50%  
Influenza
Cohort % uptake
2023
% uptake
2024
Age 50 to 64 43.1% Not offered
Age 65 to 74 77.1% 70%
Aged 75+ 84% 80%
All health care workers 24.7% 25%
All social care workers 13.1% 8%
At risk age 18 to 64 44.2% 34%
Older people care home residents 91% 85%
Weakened immune system 63.9% 46%
TOTAL 58.3% 55.6%  
The uptake of vaccinations amongst frontline health and social care staff continues
to be lower than the partnership would like it to be, despite significant work by the
Moray Immunisation Team to increase uptake.  Several extra clinic dates were put
on to increase numbers, with very little interest.  There has been a marked decrease
among most of the other cohorts too.  It has been found that the lower uptake rates
this year, compared to previous years, seem to be due to vaccine fatigue within the
population. 
Improved access to medications for patients 
Moray Pharmacotherapy team undertook a cost efficiency project during 2024/25
that achieved £660k savings through working collaboratively with GP practices.  A
Specialist Pharmacy Technician (SPT) was appointed ‘Savings Champions’ in each
practice cluster to motivate and guide and met with all GP practices
teams/prescribers/clinicians to discuss project and effective methods re cost
efficiency. 
A variety of methods were implemented including use of system tools to ensure most
efficient prescribing, generic medications prescribed rather than branded, ensuring
regular medication reviews of repeat prescriptions to ensure still relevant and regular
care home polypharmacy reviews to look at stock levels held in care homes. 
Significant savings occurred in relation to inhaler switches, skin dermatology
prescribing reviews, Diabetes blood monitoring testing aspects, dosage forms and
changes in pack size and dosage reviews.  Many of the changes benefited
individuals through a reduction in the amount of prescriptions or the frequency of
dose. 
Page 248

Page 249

Annual Performance Report 2024/25   
48
Moray Integration Joint Board
Due to the success of the project a further project is being taken forward in 2025 with
GP practices but another project is underway with local Care Homes and it is
anticipated savings will be in the region of £450k. 
Commissioning of services 
In the last year the commissioning team have been focusing on various
workstreams that are linked with exploring and widening the provider market in
Moray.  Care at Home are progressing well with a test of change to give advance
payment that provides greater stability for the provider enabling recruitment to meet
their commitments.  The result is a strengthening of the relationship and increased
confidence and assurance that the hours can be provided, by staff working to the
required standards. Quality of service provision has increased, with the most recent
Care Inspectorate inspection reporting good and very good grades across all areas. 
This approach will be further progressed in 2025/2026.   
In June 24, the Learning Disability Service secured 13 flats and 4 bungalows in
partnership with Springfield and Grampian Housing Association.  The service
provider was procured through a competitive tendering process with family members
scoring the presentation element.  This is the first time that family members have
had autonomy like this in a tendering process and the feedback from them and from
the presenting providers was that it was an experience that was valuable.  The
families also influenced the appointment of the successful provider, Community
Integrated Care and this has ensured that all parties have a good understanding of
expectations.  The Service is due to open in August 25. 
The Commissioning Team worked closely with external providers to progress the
Financial Delivery Plan project and efficiencies within contracts.  This was
undertaken by a joint review of service provision, management structures and
capacity.  By working in partnership with each provider and alongside Social Work
colleagues, the saving achieved through contracts was £184,269 for 24/25.  This will
continue throughout 25/26 where significant savings are predicted to be realised.  
The Commissioning Team have awarded 21 contracts and undertaken nine letters of
extension. The team are currently working on 19 contracts which are at various
stages of the commissioning cycle. Within this, the voice of the citizens of Moray and
learning from the Western Village tender will be embedded into practice so that the
Health and Social Care Moray Adult Commissioning Team continue to promote and
guide colleagues through Ethical Commissioning practices. 
Page 249

Page 250

Annual Performance Report 2024/25   
49
Moray Integration Joint Board
9. Working with communities across our localities 
For service planning and delivery purposes, the four localities in Moray are: Forres
and Lossiemouth; Elgin; Buckie, Cullen and Fochabers; Keith and Speyside 
Locality managers are leading on the development and delivery of locality plans to
respond to local needs and reflect the priorities of communities. First drafts were
published in 2022 and updated plans for 2023-2026 were approved by the MIJB in
March 2023. 
Elgin Locality 
Multidisciplinary Team developments 
This is a continuing piece of developmental work for the Elgin locality. Following
feedback form “How Good is our MDT” survey there is further work to ensure all
professionals are represented at local MDT’s. Recently the Local Authority
Occupational Therapy service has been attending the MDT’s with an understanding
of how they can best support the MDT’s moving forward. 
Social Prescribing 
The Elgin locality if starting to focus on social prescribing and working firstly with the
Maryhill Practice to trail this. It will then be extended to Linkwood practice once we
have a model and services that suit the Elgin population to support social
prescribing. The aim of the model is to support health and social acre professional to
connect individuals to non-clinical support and community activities. The aim to
support their health and wellbeing. The Health Improvement Team are supporting the
development of this alongside the Locality manager. The next phase of the
development will be to meet with the Practice and ascertain which are the top key
areas of focus for the practice population that would benefit for the social prescribing
model. 
Community Appointment Day (CAD)- Chronic Obstructive Pulmonary Disease
(COPD) 16th April 2025
Preparations were carried out for this event following on the success of the CAD held
for MSK in September 2024 with the purpose of inviting people with COPD
registered with the Maryhill and Linkwood GP practices. 
Keith and Speyside Locality 
The Fleming Health Hub now has over 30 services that are able to provided
appointments, classes and drop ins and that can be used by anyone across Moray
who finds it easier and closer to home to access, in the Keith and Speyside Locality
we have been forging working relations with other HSCM teams operating in and
around the Locality and with third sector and local groups to look at what we can do
in collaboration to support the health and wellbeing needs of our communities. 
Page 250

Page 251

Annual Performance Report 2024/25   
50
Moray Integration Joint Board
This has included intergenerational work where services on offer ranging from birth
through to our older population . We have been around our secondary schools
hosting 'Lets talk Health, Wellbeing and your Community' events and have had
various educational events for staff and drop ins for the local population including
Realistic Medicine and MEOC training and Dental Care guidance and
demonstrations. 
We have a room specifically set up at the Fleming Health Hub for Moving With
Dignity (proportionate care) training for our own staff and where appropriate other
organisations and Care Homes, which will reduce the number of care staff required
for visits to certain people. We are now also able to host annual health checks for
people with Learning Difficulties and our OT  teams have been able to introduce
several new sessions around falls prevention. 
We have also been utilising space at our hospital sites in Dufftown and Keith to
introduce specialist third sector services as appropriate, to encourage and make
easier, access to these services. 
<Photos  – Fleming Hospital Health Hub signage> 
We are also in discussions with our GP Practices and other professionals around
what services they would like to see introduced to meet local identified need and we
will be taking this forward in the coming year. 
Our online Professionals directory continues to support MDT working across the
Locality and we are utilising this to share updates and information across our teams.
This does not replace the many other MDT meetings that take place regularly across
our GP practices and Community Hospitals but does support staff in ensuring the
right people are involved and around any specific discussions at the right time and
as required in support of a person, which should be at the heart of all MDT working. 
With Keith and Speyside being in places very rural, we have been working hard to
ensure that we can raise awareness of services and support available that people
can access in support of their own and their families health and wellbeing.
Information areas in GP practices have been updated, HSCM teams have access to
an online Health and Wellbeing directory and some teams have identified a
Wellbeing Champion who is now taking the lead on ensuring their teams are able to
look after their own wellbeing, this is supported by our Locality Health Improvement
Coordinator. Poverty and the rising cost of living is something that impact us all and
to support this we have also ensured that all GP practices are able to order and hand
out free period products and condoms to patients and staff and that this is promoted. 
All of the above will support us encouraging and equipping people to start taking
responsibility for their health and wellbeing and awareness of alternatives to
medication where appropriate or in addition to medication as part of a more holistic
approach. This aligns with Social Prescribing and something we will be championing
more in the coming years. 
Page 251

Page 252

Annual Performance Report 2024/25   
51
Moray Integration Joint Board
Forres and Lossiemouth Locality 
The Forres and Lossiemouth Locality Steering Group continued to meet on a bi-
monthly basis during 2024/25 to review performance data and progress in relation to
their Locality Action Plan. The group continues to have public, health and social care
and third sector representation. The group also has active involvement from Children
Service Locality Planning and the Moray Council Community Support Team to avoid
duplication and ensure alignment of various plans. 
Of particular note over the past year was the ongoing engagement activity that took
place; this included pop up engagement clinics in health and care centres,
engagement activity in local schools, and events in community settings. Events were
facilitated by Health and Social Care, Children's Services, Moray Council Community
Support Unit and GP staff. 
Work has continued to take place to strengthen MDT working and development of
virtual wards to ensure the most vulnerable receive support when and where they
require. 
Forres and Lossiemouth have supported the work of the Digital Health Design and
Innovation Centre (DHI) and in particular the development of Living Lab 3 - the
Personal Data Store and Community Connections Moray platform. 
In terms of overarching performance against the 17 indicators within the Moray
Locality Dashboard, Forres and Lossiemouth Locality have performed better than the
Moray Average in all but one of the indicators, and better than the National Average
in all but two. Of particular note is the low rates of delayed discharges, low rates of
emergency hospital admissions, and low rates of mental health unscheduled bed
days. 
Page 252

Page 253

Annual Performance Report 2024/25   
52
Moray Integration Joint Board
10. Financial performance and best value 
Financial Review and Performance 
Financial performance forms part of the regular reporting cycle to the MIJB. 
Throughout the year the Board, through the reports it receives, is asked to consider
the financial position at a given point and any management action deemed as
necessary to ensure delivery of services within the designated financial framework. 
From the first quarter in the financial year, the Board was presented with financial
information that included a forecast position to the end of the year. In November
2024 the Board received a financial report which forecast an expected overspend to
the end of the financial year of £5.58m. This forecast remained consistent throughout
the remainder of the year and in January 2025, MIJB were forecasting an overspend
to the end of the year of £5.51m, the MIJB actually out turned at £4.26m overspent.
Both partners in line with the Integration Scheme, put in additional funding to cover
this overspend, so with the use of ear marked reserves totalling £0.535m, and a
transfer into ear marked reserves for the Asylum seekers grant of £0.701m, this
leaves a balance of £2.152m  in ear marked reserves to be carried forward into
2025/26. In May 2024, the MIJB agreed a savings plan of £8.297m, with a mixture of
recurring savings and recurring reductions in spend.  At the end of the financial year,
this had been achieved in part, with recurring savings of £2.302m and £2,331m
reduction in overspend. 
Given the uncertainties associated with funding and the emerging overspend
position at the early stage of the financial year, it was necessary to update the Board
regularly on the emerging financial position. This was done formally through MIJB
meetings and informally through development sessions. 
Page 253

Page 254

Annual Performance Report 2024/25   
53
Moray Integration Joint Board
MANAGEMENT COMMENTARY (continued) 
Service Area Budget
£000’s
Actual
£000’s
Variance
(Over)/ under
spend £000’s
Note
Community Hospitals & Services 7,700 8,328 (628) 
Community Nursing104,360 5,979 6,166 (187) 
Learning Disabilities 17,702 19,975 (2,273) 1
Mental Health 12,140 12,055 85 
Addictions 1,907 1,763 144 
Adult Protection & Health Improvement 249 273 (24) 
Care Services Provided In-House 24,743 22,754 1,989 2
Older People Services & Physical &
Sensory Disability 24,775 27,034 (2,259) 3
Intermediate Care & OT 1,771 1,972 (201) 
Care Services Provided by External
Contractors 1,835 1,816 19 
Other Community Services 10,383 10,280 103 
Administration & Management 3,333 3,152 181 
Other Operational Services 1,377 1,535 (158) 
Primary Care Prescribing 18,748 21,937 (3,189) 4
Primary Care Services 21,427 21,331 96 
Hosted Services 5,713 5,665 48 
Out of Area Placements 720 1,971 (1,251) 5
Improvement Grants 1,207 1,021 186 
Children’s & Justice Services 19,523 19,625 (102) 
Total Core Services 181,235 188,656 (7,421) 
Strategic Funds & Other Resources 14,891 5,318 9,573 
TOTALS (before set aside) 196,126 193,974 2,152 
Set Aside 15,639 15,639 - 
TOTAL 211,765 209,613 2,152 
The table above summarises the financial performance of the MIJB by comparing
budget against actual performance for the year.  
Page 254

Page 255

Annual Performance Report 2024/25   
54
Moray Integration Joint Board
MANAGEMENT COMMENTARY (continued) 
Significant variances against the budget were notably: 
Note 1 Learning Disabilities – The Learning Disability (LD) service is overspent by
£2,272,694 at the year-end. The overspend is essentially due to the purchase of
care for people with complex needs which resulted in an overspend of £2,806,801
and client transport of £13,781. This is offset by more income received than
expected of £524,800 (income due from another authority and Change Fund funds
from NHS) and other small underspends of £18,619 which primarily relate to
property costs. There was a minor underspend of £4,469 in other Learning
Disabilities clinical services. This budget has been under pressure for a number of
years due to demographic pressures, transitions from Children’s services and people
living longer and getting frailer whilst staying at home. The biggest overspends was
for services provided to individuals in their own homes to support their daily living
needs which enables people to stay living at home or in a homely setting for as long
as possible and day care which provides activities during the day in the community. 
Note 2 Care Services Provided In-House – This budget is underspent by
£1,988,757 at the end of the year. This relates to underspend in staffing across all
the services in this budget totalling £2,291,755 and other minor underspends of
£8,275 which is being reduced by overspends relating to transport costs £97,970;
insurance costs £29,047, utility costs £62,430 and less income than expected
£121,826. Unfilled vacancies have been the main reason for the underspend
throughout the year and the issue of recruitment has been an ongoing problem 
Note 3 Older People Services and Physical & Sensory Disability - This budget is
overspent by £2,259,056 at the end of the year. This primarily relates to overspends
for home care in the area teams £539,818, permanent care £1,766,157 due to the
increase in the number of clients receiving nursing care rather than residential care
and respite care £105,776 this is being reduced by an underspend for day care
£152,695. The variances within this overall budget heading reflect the shift in the
balance of care to enable people to remain in their homes for longer The ageing
population requiring more complex care and local demographics also contributes to
this overspend as well as the correlation between the recruitment and retention of
the internal home care service provision. 
Note 4 Primary Care Prescribing - The primary care prescribing budget is reporting
an over spend of £3,189,386 for the twelve months to 31 March 2025. The overall
average price has remained relatively consistent and includes cost reduction savings
identified by Pharmacy implemented countered by the impact of short supply causing
an increase in costs. This is spread across a range of products and is ongoing. This
overall volume increase at 3.5% is less than previously anticipated. 
Note 5 Out of Area Placements – This budget is overspent by £1,250,899 at the
year end. This is due to the continuing number of high cost individual specialised
placements. 
Page 255

Page 256

Annual Performance Report 2024/25   
55
Moray Integration Joint Board
MANAGEMENT COMMENTARY (continued) 
MIJB’s financial performance is presented in the comprehensive income and
expenditure statement (CIES), which can be seen on page 42.  At 31 March 2025
there were ear marked reserves of £2.152m available to the MIJB, compared to
£1.986m at 31 March 2024. These remaining reserves of £2.152m are for various
purposes as described below: 
Earmarked Reserves Amount £000’s
GP Premises 39
National Drugs MAT 250
OOH Winter Pressure funding 172
Moray Cervical screening 35
Moray hospital at home 5
Moray Psychological 315
MHO Funding 138
Adult protection funding for CA 18
Adult Disability payment 45
National Trauma Training services 62
Moray School Nurse 32
Moray Winter Fund HCSW & MDT 182
LD Annual Health Checks 69
Community Planning partnership 2
Moray District Nurses 56
OOH Dev Fellowship scheme 30
Asylum Seekers grant 701
Total Earmarked 2,152  
General Reserves 0  
TOTAL Earmarked & General  2,152 
GP Premises – balance of funding for improvement grants including the making of
premises improvement grants to GP contractors. The continued digitalisation of
paper GP records. Modifications for the purposes of improving ventilation and
increase to the space available in NHS owned or leased premises for primary care
multi-disciplinary teams. 
Page 256

Page 257

Annual Performance Report 2024/25   
56
Moray Integration Joint Board
MANAGEMENT COMMENTARY (continued) 
National Drugs Medication Assisted Treatment (MAT) for embedding and
implementation of the standards will he be overseen by the MAT implementation
support team (MIST). 
National Drugs Mission Moray – balance of funding for range of activities including:
drug deaths, taskforce funding, priorities of national mission, residential
rehabilitation, whole family approach, outreach, bear fatal overdose pathways and
lived and living experience. 
Out of Hours Winter Pressure funding – balance of funding to sustain GO out of
hours and to support resilience to explore operational solutions. 
Moray Cervical Screening – balance of funding for smear test catch up campaign. 
Moray Hospital at home – development of Hospital at Home provides Acute hospital
level care delivered by healthcare professionals, in a home context for a condition
that would otherwise require acute hospital inpatient care. 
Moray Psychological – funding streams for mental health, psychological wellbeing,
facilities, post diagnostic support and psychological therapies. 
Mental Health Officer (MHO) funding – funding to support additional mental health
officer capacity. 
Adult protection funding for care at home– balance of funding to build capacity in
care at home community based services. 
Adult Disability payment – funding to assist with the implementation of the adult
disability payments. 
National Trauma Training services – training for dealing with people affected by
trauma and adversity. 
Moray School nurse – funding to support NHS Grampian to retain school nurse
posts. 
Moray Winter Fund Health Care Social Workers (HCSW) – additional funding for
further HCSW in both the IJB and Emergency department. 
Moray Winter fund Multi Disciplinary Team – additional funding for service pressures
includes Discharge to Assess, Home First Frailty team and volunteer development.  
Learning Disability Annual Health Checks – to implement the annual health checks. 
Community Planning Partnership – funding towards community planning partnership. 
Moray District Nurses – allocation to support recruitment and training of District
Nurses. 
Page 257

Page 258

Annual Performance Report 2024/25   
57
Moray Integration Joint Board 
MANAGEMENT COMMENTARY (continued) 
Out of Hours (OOH) Development Fellowship Scheme – scheme to keep GP’s within
clinical practice, increase GP’s confidence and competence in OOHs work 
Asylum Seekers Grant – funding received from the Home Office to support young
people who have travelled to the UK alone. 
All reserves are expected to be utilised for their intended purpose during 2025/26. 
Set Aside – Excluded from the financial performance table above on page 15 but
included within the Comprehensive Income & Expenditure Account is £15.639m for
Set Aside services.  Set Aside is an amount representing resource consumption for
large hospital services that are managed on a day to day basis by the NHS
Grampian.  MIJB has a responsibility for the strategic planning of these services in
partnership with the Acute Sector.
Set Aside services include:
• Accident and emergency services at Aberdeen Royal Infirmary and Dr Gray’s
inpatient and outpatient departments;
• Inpatient hospital services relating to general medicine, geriatric medicine,
rehabilitation medicine, respiratory medicine, learning disabilities, old age
psychiatry and general psychiatry; and
• Palliative care services provided at Roxburgh House Aberdeen and The Oaks
Elgin. 
The budget allocated to Moray is designed to represent the consumption of these
services by the Moray population. 
The figures for 2024/25 have been derived by uplifting 2019/20 figures by baseline
funding uplift in 2020/21 (3.00%), 2021/22 (3.36%) ,2022/23 (6.70%), and 2023/24
(5.35%) and 2024/25 (6.64%): 
2024/25 2023/24 2022/23 2021/22 2020/21
Budget 15.639m 14.665m 13.92m 13.04m 12.62m 
Page 258

Page 259

Annual Performance Report 2024/25   
58
Moray Integration Joint Board
11. Looking forward – priorities for 2024/25 
Health and Social Care Moray is in a period of change.  With the appointment of
Judith Proctor as Chief Officer the senior management team have led a review of the
Strategic Delivery plan and set clear objectives with a focus on delivering
improvements to services for people, whilst ensuring efficient and effective use of
resources, ever mindful of the severe financial constraints that are affecting all
Health and Social Care Partnerships, Local Authorities and NHS services. 
Key priorities will be:- 
Realignment of Organisational Structures - A review of the HSCM organisational
structure will take place to ensure that the right resources are in place and the
governance structure to support implementation of plans is clear to ensure we drive
progress to achieve our priorities.  This will also include strengthening the integration
and oversight of Children, Families and Justice services within our system to ensure
that all partners fulfil their statutory obligations, whilst a review of current reporting
arrangements will reduce any duplication in reporting whilst strengthening oversight
of performance and delivery. 
Strengthening Performance Oversight -  With the approval of the revised Strategic
Delivery Plan in May 2025 work is underway to review the performance framework
and improve line of sight from the plan through to programmes and services who will
deliver it so that we can clearly evidence the intended and actual impacts on
outcomes for people. 
Discharge without Delay (DWD) – there have been clear objectives set out at a
National level for this programme of work and resources have been allocated to take
this forward for Moray in collaboration with NHS Grampian and Scottish
Government. 
Digital solutions – Evaluation and implementation of digital tools, new systems and
solutions will help in the provision of efficient and effective services.  Research being
led by DHI and the living labs will inform options for expanding the use of
Technology enabled care information and tools available for people to be able to
live at home and feel safe and supported and the Smart Housing that will help
people to live independently whilst ensuring they are save.  The developments of the
Community Connections tool, and the Personal Data Store will be integrated into
business as usual pathways so people have ownership of their information but can
share it with those directly involved in their support to prevent having to repeat it. 
Implementation of a new Social Work and Social Care Information Management
system will enable services to utilise a modern system that is fit for the future and
which will be able to link to other emerging technologies, ensuring we can provide
responsive and well co-ordinated supports to people. 
Expanding the principles of Self-Directed Support into all aspects of service
provision and development of flexible frameworks to provide people with more
choice and control over who provides support for them is underway. 
Page 259

Page 260

Annual Performance Report 2024/25   
59
Moray Integration Joint Board
The redesign of the Care at Home service will be implemented in the coming year
with the aim of expanding capacity to meet the growing need, whilst continuing to 
further develop pathways to increase provision of care at home. 
The Grampian wide pathway redesign of Mental Health Services is in progress and
HSCM will be heavily involved to establish a sustainable service for Moray that
ensures access to services needed. 
A new website is under construction that is aimed to aid Communication and
Engagement to provide more information about services and how to access them
and a new system will be implemented that will facilitate engagement and two way
communication with various groups.  Through the implementation of a
communication strategy, we will provide regular updates for staff on the financial
delivery plan and strategic delivery plan progress, and key aspects of the
organisation.  We aim to deliver more direct, honest and open messaging with
people to manage expectations and to ask for help and support from individuals and
communities on identifying ways we can support them better. 
Page 260

Page 261

Annual Performance Report 2024/25   
60
Moray Integration Joint Board
Appendix A: Moray area profile 
• Moray spans 864 square miles in North East Scotland
• Comprising mainly coastal and rural communities
• Rounded Population 93,400 (Scotland’s Census 2022 – Rounded population
estimates, 2023), 1.72% of Scotland’s total population.
• Population predicted to fall by 2.6% in next 10 years according to publicly
available data last updated in 2022. 
Moray age profile 
0-14 year olds 15 -64 year olds People aged 65
and over
Moray 14,500  57,500 21,400 
Scotland 21,400  3,153,300 1,091,100 
Community 
• In 2023 it was estimated that there were 43,891 households in Moray.
• 62.2% of adults living in Moray rate their neighbourhood as a good place to
live (Scotland 59.1%)
• The crime rate in Moray is 41 per 1,000 population (Scotland 55)
• The rate of non-accidental fires in Moray is 13 per 10,000 population
(Scotland 28)
• In Moray, 45 drug crimes are recorded per 10,000 population (Scotland 97) 
Economic status 
• 12.5% of Moray households are estimated to be workless (Scotland 17.8%)
• 20.1% of children aged under 16 within Moray are living with low income
families (UK 20.1%) 
• In May 2023, 11.6% of all Moray households were on Universal Credit - 5,103
households (Scotland 18.7%) 
• 63.6% of homes were in Council Tax Bands A-C, 7.34% were in Council Tax
Bands F-H, compared to 60.0% and 14.2% respectively in Scotland. 
Deprivation 
• Moray is the second least deprived mainland local authority in Scotland
• (SIMD 20)
• 2.7% of Moray population live within the highest of the Scottish Index of
Multiple Deprivation (SIMD) quintiles (most deprived)
• 13.3% live in the least deprived quintile. 
Page 261

Page 262

Annual Performance Report 2024/25   
61
Moray Integration Joint Board
Appendix B: Core suite of national indicators 
Source information from Public Health Scotland 
Survey fieldwork was carried out between October and December in the financial
year presented and respondents were asked about their experiences over the
previous 12 months. 
Please note results for indicators 2, 3, 4, 5, 7 and 9 for 2023/24 are not comparable
to previous years due to changes in survey wording. Also results for 2019/20 and
2021/22 for indicators 2, 3, 4, 5, 7 and 9 are comparable to each other, but not
directly comparable to figures in previous years due to changes in survey wording
and methodology. 
Calendar year 2023 is used here as a proxy for 2023/24 due to the national data for
2023/24 being incomplete. We have done this following guidance issued by Public
Health Scotland which was communicated to all Health and Social Care
Partnerships. Using more complete calendar year data for 2023 should improve the
consistency of reporting between Health and Social Care Partnerships. update 
Page 262

Page 263

Annual Performance Report 2024/25   
62
Moray Integration Joint Board
National Indicator 1 2023/24
Percentage of adults able to look after their health very well or quite well 92.2% 
Note – Health and Care Experience Survey is a sample survey of people aged 17 and over registered with a GP practice in Scotland.  A change in survey
wording between 2019/20 to 2023/24 has resulted in a small sampling error so care needs to be taken when comparing results. 
.Indicator Title
2023/24
NI - 2 Percentage of adults supported at home who agree that they are supported to live as independently
as possible 71.9% 
Moray’s results for 2023/24, whilst very slightly
reduced from the previous year, remain above the
Scottish rate.
Whilst there has been a reduction in this indicator over the
period, the change in wording of the survey means we cannot
compare previous years.  It is however in line with the Scottish
rate.  This may reflect how people in the community feel, where
there are continued levels of unmet need, following
assessment.  This remains a key focus to address and it is
hoped that the work being undertaken in areas such as social
prescribing, community health and wellbeing teams support and
investigations into utilising developing digital technology to
support people in their own homes may help release some
capacity so that available care can be directed to those who
these other solutions will not be suitable for. 
Page 263

Page 264

Annual Performance Report 2024/25   
63
Moray Integration Joint Board
Indicator Title 2023/24
NI - 3 Percentage of adults supported at home who agree that they had a say in how their help, care or
support was provided 59.5% 
Indicator Title 2023/24
NI - 4 Percentage of adults supported at home who agree that their health and social care services seemed
to be well co-ordinated 65.7% 
This is another indicator in which HSCM are in line with
national trends.  It is disappointing that despite efforts
to ensure that people are involved in how their support
is provided, that people do not feel that they are.  In
relation to the care provided at home by our internal
service the results from the recent care inspectorate
report were excellent and the feedback from other
inspections would indicate that the majority of people
in receipt of services are happy and feel supported. 
Progress in this indicator is above the national rate.  A
direct comparison is not possible with previous years
due to the change in wording of the survey.
Page 264

Page 265

Annual Performance Report 2024/25   
64
Moray Integration Joint Board
Indicator Title 2023/24
NI - 5 Percentage of adults receiving any care or support who rate it as excellent or good 68.7% 
Indicator Title 2023/24
NI - 6 Percentage of people with positive experience of care at their GP practice 68.6% 
This indicator is now nearer the Scottish rate than it
was previously.  
With the positive feedback from survey’s undertaken
locally for various inspections it was anticipated that
there would be an improvement in this indicator.  
It may be that the positive results will be shown in next
year, but in any case, feedback is actively sought and
acted on to enable improvements to be made.
There has been a significant increase in the
percentage of people with a positive experience of
care at their GP practice and Moray is now in line with
the Scottish rate. 
Whilst the figures are below where we would want to
be it reflects the ongoing challenges of providing care
and support in the community, for an increasingly older
population who have more complex health issues.
Page 265

Page 266

Annual Performance Report 2024/25   
65
Moray Integration Joint Board
Indicator Title 2023/24
NI - 7 Percentage of adults supported at home who agree that their services and support had an impact in
improving or maintaining their quality of life 69.3% 
Indicator Title 2023/24
NI - 8 Percentage of carers who feel supported to continue in their caring role 28.2% 
Due to the change in wording of the survey we cannot draw
a direct comparison to previous years, however it is
encouraging that we are in line with the Scottish rate and
whilst the percentage has dropped, it was not as big a drop
as the Scottish rate.
Given the impact of the financial constraints on all health
and care services, NHS and Local Authorities budgets it is
likely that this indicator will not improve in the short term,
and may in fact decrease, because the equivalent services
and support are not available to the same amount of people
as before.  Efforts are being directed to encourage early
intervention and prevention to assist people to take more
ownership of their health and wellbeing.
This result is below where HSCM would want it to be. 
Unpaid carers are an essential element of the
provision of support and care in the community and it
is a strategic priority for HSCM to support them.  A new
carers strategy was implemented during 2023/24 and
work will continue to address the areas identified to try
to have a positive impact on how carers feel.
Page 266

Page 267

Annual Performance Report 2024/25   
66
Moray Integration Joint Board 
Indicator Title 2023/24
NI - 9 Percentage of adults supported at home who agree they felt safe 70.0% 
Indicator Title 2023
NI - 11 Premature mortality rate per 100,000 persons 
Again, this is an indicator that we can’t compare with
previous years however there is less of a gap between
the Scottish rate and Moray’s position, which is
positive.  There is some way to go to get to the pre-
Covid position but it is hoped that there will be a
positive impact of the work that is being undertaken to
conduct reviews to ensure people receive the support
they need whilst drawing on the connections and
relationships that people already have in their
communities which is hoped will assist in establishing
an increase in their feeling of safety. 
Page 267

Page 268

Annual Performance Report 2024/25   
67
Moray Integration Joint Board 
Indicator Title 2024/25
NI - 12 Emergency admission rate (per 100,000 population)   
Indicator Title 2024/25
NI - 13 Emergency bed day rate (per 100,000 population)   
Page 268

Page 269

Annual Performance Report 2024/25   
68
Moray Integration Joint Board 
Indicator Title 2024/25
NI - 14 Emergency readmissions to hospital within 28 days of discharge (rate per 1,000 discharges) 
Indicator Title 2024/25
NI - 15 Proportion of last 6 months of life spent at home or in a community setting   
Page 269

Page 270

Annual Performance Report 2024/25   
69
Moray Integration Joint Board
Indicator Title 2024/25
NI - 16 Falls rate per 1,000 population aged 65+   
Indicator Title 2024/25
NI - 17 Proportion of care services graded 'good' (4) or better in Care Inspectorate inspections 
Page 270

Page 271

Annual Performance Report 2024/25   
70
Moray Integration Joint Board
Indicator Title 2024/25
NI - 18 Percentage of adults with intensive care needs receiving care at home 
Indicator Title 2024/25
NI - 19 Number of days people spend in hospital when they are ready to be discharged (per 1,000
population) 
Page 271

Page 272

Annual Performance Report 2024/25   
71
Moray Integration Joint Board
Appendix C: Local indicators 
Indicator 2020/21
(Q4)
2021/22
(Q4)
2022/23
(Q4)
2023/24
(Q4)
2024/25
(Q4)
Target
A&E attendance
rate per 1000
population all ages
17.8 20.2 20.6 22.6 22.0 21.9
Throughout 2024/25 the figure has hovered around the target of 21.9 and whilst
there was a slight increase in numbers presenting the last two quarters of the year it
was still below the high in March 2024.  Emergency Departments are under
considerable pressure and whilst considerable efforts have been made to inform
people about alternative sources of emergency care such as pharmacies, dentists,
opticians and NHS24 further detailed work will be undertaken to try to understanding
why and how people access emergency care, to help us develop intelligence about
avoidable attendances, and how we can intercept them through alternative early
prevention and intervention work.
Number of Delayed
Discharges
(including code 9)
at census point
17 46 26 43 40 26
Delayed discharges continue to fluctuate despite significant efforts from across
many teams and services to reduce the delays and the potential negative impacts
for people.  There has been sustained focus of daily multi-disciplinary meetings with
colleagues in Dr Grays and ARI to support collaborative decision making and
improve system flow.  All delayed discharges over 90 days are subject to enhanced
scrutiny and actions to facilitate discharge prioritised.  Challenges with provision of
care at home in rural locations and increased complexity of needs of frail, elderly
patients requiring discharges whilst maintaining choice and control for individuals
need to be addressed.  It is hoped that initiatives such as “Moving with
Dignity”(proportionate care) will help discharges through the use of equipment and
tools to assist those with mobility issues and reduce the need for double up care
(two carers).
The nationally led programme Discharge Without Delay is being taken forward
across Grampian in collaboration with NSH Grampian and Health Intelligence
Scotland to progress system wide actions to reduce delays and the clear
performance targets identified will provide oversight of the progress being made
over the next year.
Number of bed
days occupied by
delayed discharges
(incl. code 9) at
census point
496 1294 751 1501 1149 850
The number of bed days has decreased from the high in March 2024 but is still
sitting well above target and showing an increasing trend.  The initiatives and focus
on delayed discharges should reduce this number over the next year.
Rate of emergency
occupied bed days
1773 2140 2749 2509 2412 2681
Page 272

Page 273

Annual Performance Report 2024/25   
72
Moray Integration Joint Board
for over 65s per
1000 population
The figures are showing a reducing trend and have been below target throughout
the year.
Emergency
admission rate per
1000 population for
over 65’s
174.8 183.0 185.8 179.7 177.8 187
This year the rates have been significantly lower than the previous year, with the
exception of the period October to December, where there was peak in previous
year’s which indicates it may be a seasonal variation.
Number of people
over 65 years
admitted as an
emergency in the
previous 12 months
per 1000
population
119.3 125.2 129.2 125.8 125.7 131
This rate is well below the target albeit there is slight increasing trend.
% Emergency
readmissions to
hospital within 7
days of discharge
5.0% 3.4% 3.6% 4.4% 3.9% 3.7%
This indicator has fluctuated during the year with a high in September, and although
it has just gone over target it is below the March 2023/24 figure and overall is stable
% Emergency
readmissions to
hospital within 28
days of discharge 
9.8% 8.0% 7.5% 8.3% 7.4% 7.9%
This rate has been showing a slight decreasing trend and with the exception of a
high in September 2024 has been below target.  The increase in September figures
has been reflected over several years so may be a seasonal variation.
% of patients
commencing
Psychological
Therapy Treatment
within 18 weeks of
referral
100% 33% 73% 57% 65% 90%
This indicator has reflected the challenge the service is experiencing with
significantly increased demand and despite initiatives to undertake group work
(where appropriate) to increase throughput and maximise capacity it has not been
possible to generate the capacity required to meet the standard and achieve the
target.   
NHS Sickness
Absence (%of
hours lost)
3.1% 4.7% 5.9% 5.7% 4.9% 4%
Council Sickness
Absence (% of
calendar days lost)
- 8.9% 9.7% 9.7% 8.2% 4%
Page 273

Page 274

Annual Performance Report 2024/25   
73
Moray Integration Joint Board
Application of the appropriate absence monitoring procedures are monitored closely
and support provided to individuals as required to ensure that absences are
minimised.  There are various wellbeing initiatives and supports available to staff
and managers, such as vaccination campaigns for flu and Covid-19 to reduce
severity and duration of illness, work station assessments where ergonomic
equipment is needed and access to Occupational Health Service to provide support
for both physical and mental health issues. 
Appendix D: IJB decisions and directions 
Agendas and reports for all MIJB meetings during 2023/24 are set out in the papers
which are published on the Moray Council website. 
Board meetings are open to the public and webcast, meaning they can be watched
remotely as they happen or the recording viewed at a later time. 
Governance considerations and decisions made by the MIJB have included:  
May 2024 • Agreed to note the expected financial position at the end of the current
financial year and the implications for 2024/25 and noted the recovery
action plan and the intent to progress the savings highlighted.
• Agreed to note the updated Financial Strategic Risk Register which
provides an overview of the strategic financial risks, along with a summary
of actions which are in place to mitigate those risks. 
• Formally approved the revenue budget for 2024/25, following
consideration of the risks highlighted in the report.
June 2024 • Approved the unaudited Annual Accounts to be submitted to the external
auditor, noting all figures remain subject to audit. Noted the Annual
Governance Statement and accounting policies applied in the production
of the unaudited Annual Accounts.
• Approved the updated Local Code of Corporate Governance which
supports the Annual Governance Statement.
• Approved the MIJB Directions Policy.
September
2024
• Approved the Audited Annual Accounts for the financial year 2023/24.
• Approved the Moray Mental Health and Wellbeing Delivery Plan 2024-
2026 and approved the proposed governance structure in Moray.
• Approved the Adult Joint Strategic Needs Assessment 2024 for Moray.
• Approved the publication of the Health and Social Care Moray Annual
Performance Report 2023/24.
• Approved the publication of the Health and Social Care Moray Annual
Complaints report 2023/24.
Page 274

Page 275

Annual Performance Report 2024/25   
74
Moray Integration Joint Board
November
2024
• Approved the draft Public Sector Climate Change submission to
Sustainable Scotland Network for the reporting year 2023/24.
January 2025 • Endorsed the establishment of the Grampian Strategic Change Board.
• Endorsed the collaborative approach proposed to develop a Route Map
for Strategic Change.
• Agreed that the IJB Chief Officers should actively participate in the
development and implementation of the Route Map for Strategic Change
and work collaborative with other partners to ensure the success of this
crucial transformation program.
• Approved the charges for services for the 2025/26 financial year for
recommendation to Moray Council for approval and inclusion into their
budget setting processes. 
• Approved the Children’s Services Plan 2023/24 annual report.
• Approved the outline business case for the replacement of the Social
Work and Social Care case management system.
• Endorsed the collaborative whole system approach being taken in Moray
and by partners across Grampian with regards to the Getting in Right for
Everyone (GIRFE) programme. 
• Agreed to adopt the Standards Commission’s Model Code of Conduct for
Members of Devolved Bodies as the Code of Conduct for the Moray IJB.
March 2025 • Approved the 2025/26 proposed savings plan.
• Formally approved the Revenue Budget for 2025/26.
• Approved the updated Medium Term Financial Framework.
• Approved the draft Moray IJB Equality Mainstreaming Progress Report 2021-
2024 for publication by April 2025.
• Approved the strategic objectives of the Strategic Care at Home Group. 
Page 275

Page 276

Annual Performance Report 2024/25   
75
Moray Integration Joint Board
Appendix E: Changes to Membership of Moray Integration
Joint Board during 2024/25    
Changes to membership of MIJB during the year: 
Councillor Tracy Colyer became MIJB Chair on 1 April 2024. She resigned from the
Board in September 2024. Denis Robertson, Vice-chair, took over the role of Chair
until the end of 2024/25. 
Councillor Elaine Kirby takes on the role of Chair of the Board from 1 April 2025 until
30 September 2025, following which the role of Chair will revert back to a Health
Board Member in line with the Integration Scheme. 
Following an open recruitment process, Sheila Brumby was appointed as Service
User Stakeholder and Janette Topp as Third Sector Stakeholder in May 2024. Ms
Topp resigned from the Board on 11 February 2025. 
NHS Grampian nominated Alex Stephen, Director of Finance, to MIJB, as of 1 July
2024. June Brown, Executive Nurse Director, is Mr Stephen’s nominated substitute. 
Dr Malcolm Simmons, GP Lead, stood down from the Board on 31 March 2025.
This vacancy will not be recruited to. Dr Robert Lockhart, GP Lead, will
continue as member of the MIJB and Clinical and Care Governance
Committee. 
Judith Proctor was appointed Chief Officer of the MIJB and HSCM in November
2024, having served as Interim Chief Officer for the previous five months. She
succeeded Simon Bokor-Ingram who stepped down from the position at the end of
May 2024 due to health reasons. 
Jim Lyon was appointed Interim Chief Social Work Officer and Head of Service in
June 2024. He succeeded Tracey Stephen who stepped down from the MIJB on her
relocation to take up a role with a local authority in England. 
Agendas and reports for all MIJB meetings during 2024/25 are set out in the
document packs which are published on the Moray Council website. 
Hybrid board meetings combine in-person attendance with remote participation, via
video conferencing. They are open to the public to attend and are also webcast,
meaning they can be watched remotely as they happen or the recording viewed at a
later time. 
Page 276

Page 277

Annual Performance Report 2024/25   
76
Moray Integration Joint Board
Appendix F: Inspections of services 
The annual performance report requires the IJB to report on inspections by external
bodies. 
Joint Inspection 
Adult Support and Protection 
Moray's multi-agency Public Protection Partnership has evidenced substantial
improvement in supporting and protecting adults at risk of harm. 
The positive impact achieved by local authority, health and police colleagues in their
work to keep people safe, has been acknowledged with publication in October 2024
of the Joint Inspection of Adult Support and Protection in Moray. 
The progress review by the Care Inspectorate and its scrutiny partners was a follow-
up to a joint inspection carried out in 2022. On their return in August, inspectors
found significant progress had been achieved across all seven priority areas
identified for improvement. 
Key accomplishments identified in the progress report include: 
• Consistent application and delivery of key processes: Frontline staff were
confident and highly professional. The partnership overall followed its
comprehensive multi-agency adult support and protection procedures
rigorously.
• Improved investigations: Full adult support and protection investigations were
now carried out for all adults at risk of harm who required them. The quality of
these investigations had significantly improved, with almost all rated as good
or better. This was described by inspectors as “another impressive
improvement.”
• Enhanced management of risk: The quality of chronologies (recording the
order of events), risk assessments, and protection plans had greatly
improved. Presence of risk assessments required further improvement, so
that all adults at risk of harm had one.
• Effective case conferences: Case conferences were now clearly defined and
held for all adults at risk of harm who required them. There were competent
and well-executed, with almost all rated good or better for quality. The
partnership was actively working to support people to participate in their own
case conferences.
• Strategic leadership: The partnership had rigorously implemented its
improvement plan following the 2022 inspection and taken forward a range of
notable improvement focused activities.
• Strengthen governance: Robust measures were in place to identify concerns
early and promptly implement remedial action. Operational managers worked
diligently and effectively to bring about necessary improvements to adult
support and protection.
• Multi-agency self-evaluation: The partnership had achieved significant
progress and its cohesive programme of multi-agency audits and quality
Page 277

Page 278

Annual Performance Report 2024/25   
77
Moray Integration Joint Board
assurance activities was successful. Frontline staff were involved in informing
the improvement work. 
Care Inspectorate 
The following services managed by the HSCM were inspected in 2024/25. 
Short Term Assessment and Reablement Team (START) - Support Service 
Key messages: 
• People enjoyed support which was dignified and respectful.
• Staff felt supported by their supervisors and colleagues.
• Staff recruitment was managed well by the service.
• People's reablement benefitted from good links between the service and other
health and social care colleagues.
• Improvements were required to ensure people benefitted from safe
medication procedures.
• Care plans required more detail and more regular review. 
Evaluation of service 
How well do we support people's wellbeing?  4 - Good
How good is our leadership?  4 - Good
How good is our staff team?  5 – Very good
How well is our care and support planned?  3 - Adequate 
Moray Supported Lodgings Project – Adult Placement Services 
Key messages: 
• The management team evidenced insight to service gaps and provided a
service improvement plan, which is in the early stages of implementation. 
• The impact of a six-month vacancy of the only supervising social worker post
has had a negative impacted on predictable support for caregivers and taking
forward service improvement plans. 
• Supported lodging caregivers provide young people with a safe and stable
home base. 
• Young people are supported to reconnect with family and establish a positive
network of support that aligns with their ethnicity, culture, traditions, and
beliefs. 
• Educational attainment is a high priority with young people, who are enrolled
in 'English as an additional language' lessons, and secondary and further
education provisions. 
• Young people benefit from leading and directing their own support within a
multi-agency approach to care planning.
Evaluation of service 
Page 278

Page 279

Annual Performance Report 2024/25   
78
Moray Integration Joint Board
How well do we support people's wellbeing?  3 - Adequate
How good is our leadership?  3 - Adequate
How good is our staff team?  2 - Weak
How well is our care and support planned?  4 - Good 
Community Support Service - Housing Support Service 
Key messages: 
• People were supported by staff who were kind and caring. 
• People were supported to access health care, meaning their care and support
benefitted their health. 
• Improvements were required to ensure people benefitted from safe
medication procedures. 
• Quality assurance checks and audits, that should improve people's care,
required further development. 
• People did not know who was supporting them and were not confident that
they received the correct amount of support. 
• People's care, and care plans, had not been reviewed regularly. 
Evaluation of service 
How well do we support people's wellbeing?  3 - Adequate
How good is our leadership?  3 - Adequate
How good is our staff team?  3 - Adequate
How well is our care and support planned?  3 - Adequate 
Mental Welfare Commission for Scotland 
Muirton Ward, Seafield Hospital, Buckie 
An announced visits was carried out on 11 July 2024 to Muirton Ward at Seafield
Hospital, Buckie, which is an older adult assessment unit for people with dementia. 
Key positive findings: 
• Compassionate Care: Individuals and most relatives described staff as caring,
approachable, and experienced. The ward atmosphere was calm and settled.
• Environment: The ward offered spacious and dementia-friendly areas, with
good use of garden and communal spaces. Privacy was respected, and
signage aided navigation.
• Care records: Files were well organised, and care plans addressed both
physical and mental health needs. Covert medication and legal documents
were appropriately documented.
• Physical health monitoring: There was consistent attention to physical health
alongside mental health needs.
Page 279

Page 280

Annual Performance Report 2024/25   
79
Moray Integration Joint Board
• Rights awareness: Advocacy services were engaged, and information on
rights was visible and included in carers’ information packs.
The Commission made five recommendations: 
• Ensure a formal process is in place to regularly review risk assessments and
risk management plans.
• Provide dedicated psychology support to inform care and assist with recovery,
particularly in managing complex or distressed behaviours.
• Review and improve the system for obtaining updates from community
services (e.g. social work) to support timely discharge planning.
• Ensure all psychotropic medications are legally authorised and that a regular
audit process is implemented to maintain compliance.
• Appoint a dedicated activity therapist to support a structured and meaningful
activity programme tailored to individual and group needs. 
Ward 4, Dr Gray's Hospital, Elgin 
An announced visit was carried out on 16 October 2024 to Ward 4, Dr Gray’s
Hospital, Elgin, which is an18-bedded adult acute psychiatric admission ward for
adults. 
Key positive findings: 
• Staff dedication: Most individuals spoke positively about the caring and helpful
nature of staff.
• Patient involvement: People felt involved in decisions about their treatment
and had regular access to their consultant psychiatrist.
• Improved discharges: There has been some progress in discharging long-stay
patients, although challenges remain due to delays in arranging community
support.
• Electronic records: The introduction of the TRAKCare healthcare information
system has improved record-keeping, with more consistent and detailed
updates.
• Multidisciplinary team (MDT) records: MDT meeting documentation has
significantly improved, providing clear, detailed summaries of care and
treatment decisions. 
The Commission made 10 recommendations, including: 
• Better risk assessment and care planning.
• Improving the quality of care plans
• Ensuring access to psychology and pharmacy support.
• Developing a seven-day activity programme.
• Addressing outstanding environmental safety issues.
• Improving legal compliance and promoting patient rights. 
HSCM submitted an improvement action plan to address the recommendations. 
Page 280

Page 281

Annual Performance Report 2024/25   
80
Moray Integration Joint Board
Care Inspectorate – inspections of externally commissioned services 
Care and support is commissioned from independent and third sector providers and
these services are subject to contract monitoring by the Commissioning service to
ensure that services are safe, effective and that they meet people’s needs. 
Performance is monitored through formal contract meetings, review of compliments,
complaints and feedback from staff, carers and people who use services. Visits to
providers involve observing care and support and looking at records and documents.
The team also work closely with the Care Inspectorate. 
The following services commissioned by the partnership were inspected by the Care
Inspectorate in 2024/25. 
Name of
service
Service
provider
How well
do we
support
people's
wellbeing?
How good is
our
leadership? 
How
good
is our
staff
team?
How good
is our
setting?
How well
is our
care and
support
planned? 
Wakefield
Nursing
Home,
Cullen
Parklands
Group
4 4 4 4 4
Abbeyside
Care Home,
Elgin
Abbeyside
Care Group
4 Not
assessed
4 Not
assessed
Not
assessed
Spynie Care
Home, Elgin
Intobeige 3 4 3 4 4
Moray
Services
(Housing
Support)
Cornerstone 4 3 3 Not
assessed
3
The Grove
Care Home,
Elgin
Abbeyside
Care Group
4 5 5 Not
assessed
Not
assessed
Meadowlark
Care Home,
Forres
Renaissance
Care
4 5 5 4 5
Ark Moray
support
service,
Forres
Ark Housing
Association
3 4 3 Not
assessed
Not
assessed
Care at
Home 
Care Quality
Services
Limited -
Moray
3 3 3 Not
assessed
Not
assessed
Cathay
Nursing
Home,
Forres
Wallace
Management
Services
Limited
4 4 4 4 4
Wakefield
House Care
Home
Parklands
Group
4 4 4 4 4
Page 281

Page 282

Annual Performance Report 2024/25   
81
Moray Integration Joint Board
Name of
service
Service
provider
How well
do we
support
people's
wellbeing?
How good is
our
leadership? 
How
good
is our
staff
team?
How good
is our
setting?
How well
is our
care and
support
planned? 
Greyfriars
Close, Elgin
Turning
Point
Scotland
4 4 4 NA 4
Moray
Services
Cornerstone 4 3 3 NA 3
SAMH
Housing
support
service
SAMH 5 6 NA 5 5
Parkholme,
Lossiemouth
Cornerstone 3 3 3 3 3
RLO, Elgin Real Life
Options
5 5 NA 5 5
Chandlers
Rise, Elgin
Hanover
Housing
Support
Service -
Care (North)
4 4 NA 4 4
Cornerstone
Buckie
Cornerstone 5 5 NA 5 5 
The six-point scale 
6        Excellent Outstanding or sector leading
5 Very good Major strengths 
4 Good Important strengths, with some areas for improvement
3 Adequate  Strengths just outweigh weaknesses
2  Weak Important weaknesses - priority action required
1 Unsatisfactory Major weaknesses - urgent remedial action required 
Page 282

Page 283

Annual Performance Report 2024/25   
82
Moray Integration Joint Board 
Find out more about the Moray Integration Joint Board and Health & Social Care
Moray on our website: 
https://hscmoray.co.uk/index.html 
Follow us on social media 
Facebook @ hscmoray
Instagram @hscmoray 
For further information contact: 
Health & Social Care Moray
Moray Council Offices
High Street
Elgin 
Moray IV30 1BX 
Gram.hscmcorporate@nhs.scot
Page 283

Page 284

Page 284

Page 285

REPORT TO: MORAY INTEGRATION JOINT BOARD AUDIT, PERFORMANCE
AND RISK COMMITTEE ON 19 JUNE 2025 
SUBJECT: DEVELOPMENT SESSIONS IN NOVEMBER 2024 FOR
CHILDREN, FAMILIES AND JUSTICE SOCIAL WORK 
BY:  INTERIM CHIEF SOCIAL WORK OFFICER/HEAD OF SERVICE   
1. REASON FOR REPORT 
1.1 To inform Committee of the Development Sessions undertaken by Children and
Families and Justice Social Work in November 2024 and the resulting actions
to address learning from social work practice. 
2. RECOMMENDATION 
2.1 It is recommended Committee scrutinises and notes: 
i) the activity and outcomes related to the Development Sessions in
2024; 
ii) the content of the Improvement Action Plan at Appendix 3; and 
iii) agree an update on progress of the Action Plan will be provided to a
future Committee meeting. 
3. BACKGROUND 
3.1 Professional learning and development must be at the heart of continual
improvement of public services including, self-evaluation, reflective practice,
findings from complaints, positive feedback, practice review methods, and most
importantly, external evaluation - inspections. 
3.2 In recent years there have been complaints which resulted in claims for
financial compensation by complainants, learning reviews, a children’s services
inspection, and other review activities which highlighted areas for improvement
and strengths from which to build upon. 
3.3 In 2024 Moray Council Social Work Services was the focus of negative media
attention due to an upheld complaint in court resulting in financial
Item 11.
Page 285

Page 286

compensation. This was related to professional practice and processes which
resulted in failure to uphold standards and ensure effective remedy. 
3.4 In response, the Interim Chief Social Work Officer (CSWO), asked for a desk-
top review of this case and four other significant complaints spanning over a 4-
year period. Based on the initial themes identified, this included similar
complaints received over the two years leading to the decision for practice
review.   
3.5 To address the identified underlying practice issues, workforce learning and
development sessions were arranged to reflect on practice and identify service
improvements from the findings of the above processes and from “leadership
supported” reflective practice in Children, Families and Justice Services. 
3.6 Two Development Sessions were devised, led by the Interim CSWO and
supported by the Policy, Development & Commissioning Team, which took
place on 14 and 27 November 2024. These sessions were attended by 111
members of staff. The focus was mainly on the key themes identified from
historic and current complaints findings including: 
 Communication 
 Timely actions and practice
 Process and procedure
 The voice of children, young people and families
 Power imbalance and practice governance 
3.7 A conversation café approach was used which enabled staff to freely discuss
each of the themes with colleagues and reflect on their practice. The tone of the
sessions was positive and encouraged staff to think about ‘what we do well’
and ‘what we can do better', in line with the continual improvement culture
being promoted in the service. 
3.8 Staff generated a wide range of ideas they believe will contribute to
improvement across the service. These were refined and organised into an
Action Plan (Appendix 3) which is in line with the Children’s Services Joint
Inspection Improvement Plan 2024 and the Children’s Service Plan 2023-2026. 
4. KEY MATTERS RELEVANT TO RECOMMENDATION 
4.1 Initial feedback from the Development Sessions was provided to staff
(Appendix 1) which was followed up by a Learning from Practice Report
(Appendix 2) detailing the approach, reflective process, and aims. 
4.2 The Learning from Practice Report records the responses from staff at the
Development Sessions, emerging themes, and improvement actions. It was
highlighted by the Interim Head of Service that future actions would contribute
to the overall plans for continual improvement and self-evaluation and fit with
the Children’s Services Joint Inspection Improvement Plan 2024 and the
Children’s Service Plan 2023-2026. 
4.3 The above noted Learning from Practice Action Plan (Appendix 3) was
developed following the Development Sessions by the Policy, Development &
Commissioning Team on behalf of the Interim Head of Service. The progress of
Page 286

Page 287

the plan is reviewed by Service Managers ensuring the workforce is fully
involved and is updated accordingly by the Consultant Practitioners. 
4.4 The Action Plan has a RAG rating: Green = Completed, Amber = In Progress
and Red = Not Started Yet. Most red areas are not outstanding tasks but future
actions up to 2026 which shows positive identification of future work
requirements and plans.  Currently there are 26 actions in green including
several policies, procedures and training initiatives with seven red actions out of
date, of which four are procedures, one is kinship, and two are forms being
created.   
4.5 Additionally, the Children, Families and Justice Social Work leadership and
workforce has identified the following priorities: 
 Permanence planning
 Manageable caseloads
 Recruitment and retention
 Social work practice
 Quality Assurance Framework 
4.6 The outcome of the Development Sessions and the Learning from Practice
Action Plan is part of a wider continual improvement ethos. It is contributing to
the current self-evaluation and continual improvement model launched across
children’s services on 24 September 2024 and the drive for the development of
Health and Social Care Moray as a “learning and development” organisation. 
5. SUMMARY OF IMPLICATIONS 
(a) Corporate Plan and 10 Year Plan (Local Outcomes
Improvement Plan (LOIP)) and Moray Integration Joint
Board Strategic Plan “Partners in Care 2022 – 2032”
This report notes the continuous improvement and self-evaluation
activity required within the above-named plans and the Children’s
Services Plan.  The Action Plan links to the LOIP Outcome 2 – Building a
Better Future for our Children and Young People in Moray by delivering
actions which contribute to ensuring children and young people’s voices
are heard and children live in safe and supportive families. 
(b) Policy and Legal
None arising as a direct result of this report.  The Action Plan is inclusive
of actions for the Children, Families and Justice Social Work Policy
Team. 
(c) Financial implications
None arising as a direct result of this report.   
(d) Risk Implications and Mitigation
None arising as a direct result of this report. The Action Plan requires
regular monitoring and review to ensure actions are progressing in a
timely manner to mitigate future complaints and financial compensation. 
(e) Staffing Implications
There are no proposed changes to the staffing or reporting
relationships. 
Page 287

Page 288

(f) Property
None arising as a direct result of this report.   
(g) Equalities/Socio Economic Impact
None arising as a direct result of this report.   
(h) Climate Change and Biodiversity Impacts
None arising as a direct result of this report.   
(i) Directions
None arising as a direct result of this report.   
(j) Consultations
Children, Families and Justice Social Work Senior Management Team
and workforce during the Development Sessions in November 2024 and
in follow up correspondence and workplace meetings as documented. 
6. CONCLUSION 
6.1 This report provides Committee with an overview of the activity and
outcomes related to the Development Sessions held in 2024 and the
content of the resulting Action Plan. 
6.2 Committee is requested to note this report and agree to receive an update
on the progress of the Action Plan at a future Committee Meeting. 
Author of Report: Jim Lyon, Chief Social Work Officer / Head of Service 
Background Papers: Appendix 1 - Development Session Brief Summary  
Appendix 2 - Development Day Report  
Appendix 3 - Learning from Practice Action Plan 
Ref: 
Page 288

Page 289

Communication
‘Needs to be consistent, clear and collaborative’
‘Ensure expectations are realistic, that we do
what we can to meet these – we must
communicate if we can’t meet expectations’
Timely Actions and Practice
‘Paperwork to be streamlined’
‘There are challenges with high workloads
and being able to have protected time when
there is a shortage of staff’
Power Imbalance and Governance
‘We need to build trust, work in partnership, be
transparent about concerns while giving
families choice and empowering them to make
positive changes’
‘We need strong leadership and support when
working with families who are more
challenging’
Voice of Children, Young People and Families
‘This is a continuing process, not one-off or in
response to a meeting or report’
‘We would like a toolbox to help us hear children
and young people’s voices’
Process and Procedure
‘We want to have clear processes and
procedures which are updated and
accessible’
‘We like the use of flowcharts and
checklists as methods to support how
things are meant to happen’
Children and Families & Justice Services Development Session
Learning from Practice – 14 & 27 November 2024
Following a review of feedback from people receiving our service, five key themes of practice were identified:
• Communication
• Timely actions and practice
• Process and procedure (not being followed / not being in place / out of date)
• The voice of children, young people and families
• Power imbalance and governance
In November 2024, 111 people attended two Learning from Practice sessions to explore the themes and share
views on how we can deliver improved services. Overall, staff want to feel confident and skilled in their role
through good induction, training, supervision, clear policies and procedures and streamlined paperwork.
You told us: 
Your feedback on the sessions was:
• The sessions were ‘meaningful and snappy’
• Great to hear the Head of Service views and vision
• The sessions felt positive and boosted morale
• Networking opportunities were welcomed
• Want to see things moving on – change to be seen and evident
We are working to collate all the feedback you gave us. Your feedback will inform our Social Work Development
Plan.
APPENDIX 1
Page 289

Page 290

APPENDIX 2
Continual Improvement and Development
Learning from Practice Report – January 2025  1 
Learning from Practice Report
Children, Families & Justice Services Development Session
Learning from Practice – 14 & 27 November 2024 
Page 290

Page 291

APPENDIX 2
Continual Improvement and Development
Learning from Practice Report – January 2025  2 
Learning from Practice – 14 & 27 November 2024
In 2024 Moray Council Social Work services was the focus of negative media attention due
to complaints.  The Head of Service asked for a review of specific historical complaints and
complaints received over the last two years. 
The desk-top review consisted of reading case files, CareFirst, electronic files and
discussions with some of the social work staff involved. Five key practice themes were
identified:  
• Communication (with children, young people and families, and communication with
other professionals) 
• Timely Actions and Practice
• Process and Procedure (not being followed, not being in place or out of date)
• The voice of Children, Young People and Families 
• Power Imbalance and Governance
The findings indicated that the themes were relevant to all the teams across children and
families and justice services. Resultantly, the Head of Service led two Learning from Practice
development sessions held on 14 and 27 November 2024. The sessions were well attended
by 111 staff with good representation from all teams.
The Head of Service provided the context for the sessions by detailing the five themes and
emphasising the need for establishing a learning and development culture within the service.
A conversation café approach ensured staff were able to discuss the learning from the
themes and hear the views of colleagues from different teams. Identified managers, with an
interest in learning and development, led and facilitated discussions and practice reflection
leading to the start of a development plan. The tone of the day was positive and encouraged
staff to think about what we do well and what we can do better.
The Head of Service closed the sessions highlighting the importance of effective working
together, support and challenge, continual improvement and the need for everyone to lay
strong foundations for our learning and development culture. This was not a one-off overall
event but the start of a wider programme of self-evaluation and improvement in which
everyone will be involved. 
Feedback included:
 The sessions were ‘meaningful and snappy’ 
 It was good to hear the Head of Service’s views and vision 
 The sessions felt positive and boosted morale 
 Networking opportunities were welcomed 
 Staff want to see things moving on – change to be seen and evident 
Page 291

Page 292

APPENDIX 2
Continual Improvement and Development
Learning from Practice Report – January 2025  3 
To ensure momentum the Head of Service shared a summary of the sessions with staff in
December 2024. 
‘Thank you for taking part in the above sessions in November and for your honest
and valuable contribution to our plans for continual improvement and self-evaluation. 
The sessions generated lots of ideas and reflection across the range of themes
identified. I have enclosed a one-page summary of the sessions while we put
together a more detailed report and actions which shall come out in the new year. 
It was great meeting you and seeing how committed you are to establishing a
learning and development culture within the service. You are dedicated, committed
and diligent and we cannot provide services without you.
I look forward to continuing our work next year and to further engagement with you.’ 
From the two sessions we received over 75 flipcharts with lots of positive ideas and
thoughts.  It took some time to manage the volume of information received and to make it
more manageable, we organised it into areas of practice on which we need work on
(Appendices 1 & 2). 
Page 292

Page 293

APPENDIX 2
Continual Improvement and Development
Learning from Practice Report – January 2025  4 
1. Themes
Below is a summary of the main themes detailing the findings from the file reading and what
staff reflected on.
Theme 1: Communication (with children, young people and families, and communication
with other professionals) 
The file reading told us: 
Communication with families can be inconsistent, limited and delayed.  There are
inconsistencies in checking families understand the outcomes from their meetings, and they
are not always kept up to date on changes. 
Expectations of families and other professionals are not always managed.  Over promising
and under delivering can lead to expectations not being met.  Changes of plans are not
always communicated effectively.
Within professional networks, information can get lost, be misinterpreted and not always
followed up.
Staff reflected that:
 Communication with families should be regular, open and transparent, families
should be updated on changes, plans and our involvement 
 Communication within the workforce (colleagues, managers, service managers,
senior leadership) needs to be consistent, clear and collaborative
 Expectations from families, colleagues and partners should be managed better. We
must communicate effectively where, for any reason, changes have occurred, there
has been slippage in delivering agreed tasks or outcomes
 Information sharing between agencies and professionals needs to improve 
 Roles and responsibilities of different teams within social work and across the
children’s services partnership could be better understood
 To reduce misunderstanding, we must reflect on our messaging and check with the
recipient that the message has been properly understood
Theme 2: Timely Actions and Practice
The file reading told us: 
Paperwork and tasks are not always completed within timescales, leading to information not
being shared with families or professionals when it should.
The quality of assessments, chronologies and recording needs to improve. We need to be
consistent in recording the rationale for decision making, and the process leading to
decisions.
Staff reflected that:
 Improved technology would aid efficiency and effectiveness
 The suite of paperwork should be reviewed and streamlined
 Information should be shared with families in plain language, in time for them to
prepare for whatever process will follow
Page 293

Page 294

APPENDIX 2
Continual Improvement and Development
Learning from Practice Report – January 2025  5 
 Processes and procedures should continue to be updated
 Realistic expectations should be set for people who receive our services and the
children’s services partnership 
 Partnership training on GIRFEC, chronologies, assessment and child planning would
be beneficial
 Staff shortages create high workloads meaning there is a lack of time to produce the
quality of work required 
Theme 3: Processes and Procedures (not being followed, not being in place or out of
date)
The file reading told us:
Processes and procedures are not always followed or understood. Some procedures are out
of date or need to be created.     
Staff reflected that:
 There has been an improvement in processes and procedures since the introduction
of the policy team
 They would welcome flow charts and check lists to improve understanding and
access simplified professional processes 
 Opportunities to be involved in developing processes and procedures would be
welcomed
 It would be helpful to find more efficient ways of being kept up to date with new
processes and procedures e.g. agenda items in team meetings, briefings, future
development sessions, one person responsible for updating others
Theme 4: The Voice of Children, Young People and Families 
The file reading told us:
Practice is varied in evidencing the voice of the child depending on their age and stage of
development.
Children and families do not always believe their views have been considered when we have
made decisions with which they do not agree.
Staff reflected that:
 Children should be asked who they want to help them express their views
 The Advocacy service is not the only, or always the best way to gather views
 Gathering views should be a continual process, not just a one-off activity 
 Being honest and establishing trust is the key to effective relationships
 A tool kit to help gather views would be beneficial
 Children, young people and families, need to be helped to understand why it is
not always possible to act on their wishes, while ensuring their voice is heard 
Page 294

Page 295

APPENDIX 2
Continual Improvement and Development
Learning from Practice Report – January 2025  6 
Theme 5: Power Imbalance and Governance
The file reading told us:
Families have told us they feel we hold power over them (often referred to as the badge of
office), and they feel ‘done to.’ 
Staff can find it difficult to balance parental rights and responsibilities and the rights of the
child.
A power imbalance can also exist when a parent or carer is in a position of high authority or
has a strong or hostile manner.  Staff can be challenged and intimidated in these
circumstances and might find it difficult to respond in a balanced way.
Staff reflected that:
 It is important to build trust, work in partnership with families and be transparent
about concerns 
 Families must be given choice and be empowered to make positive change
 They need strong leadership and support when working with families that are more
challenging
 Regular reflective, high support and high challenge supervision is important
 Training and support would enable them to be skilled and confident to professionally
challenge families and other agencies when required 
2. Actions
Staff also expressed their interest in: 
• Training which covers specialist areas of practice and core social work skills 
• Having leaflets explaining the social work role and procedural meetings 
• Being involved in development of new processes, paperwork, & creation of new tools
• Development sessions or briefings to be kept up to date with changes  
• An action plan being based on feedback given at the development days
Some areas of work identified in this report are already in progress, including: 
Streamlining Paperwork: A short life working group is in place to review the social work
suite of paperwork.
Training: A review and creation of a training plan for Social Workers in Training, Newly
Qualified Social Workers and the wider staff group. This is in response to the new
registration requirements of the Scottish Social Services Council and the mandatory learning
activities for Newly Qualified Social Workers. The current induction of all new staff is also
under review.
There is a plan in place to deliver child protection training for all social work staff.  
More than 70% of staff are trained in Safe and Together.  Solution orientated training was
well attended by around 80% of social work staff.
Page 295

Page 296

APPENDIX 2
Continual Improvement and Development
Learning from Practice Report – January 2025  7 
Child and Young Person’s Voice: Staff requested tools to support them in collating the
views of the child.  A similar request was made from the Child Protection Committee which
requested a toolbox for practitioners. A short life working group is working to progress this
task.
Processes and Procedures: Old policies and procedures are being updated. New
procedures are being written in response to changing needs and recommendations from
other service plans. Benchmark work is being carried out on a range of policies and
procedures including a Procedure for Conducting Team Around the Child Meetings, a
Significant Occurrence Procedure, and Managing Referrals Involving Staff amongst others.
3. Conclusions:
Staff agreed with the themes identified by the desktop review and made suggestions for
improvement. They are positive that taking a learning and development approach with an
action plan, will support continuous learning and development.
They reflected the importance of feeling confident and skilled in their role through good
induction, training and supervision. It is important for them to learn and grow together with
members of other teams, so they can benefit from each other’s knowledge and skills.
They expressed the importance of having clear processes and procedures to ensure
consistency in practice.  This is important for people receiving our services, so they can
expect the same response and professional standards in a consistent manner regardless of
the team providing the service. It also helps to ensure a clear governance structure.
Staff noted there are too many different report formats and they would like the paperwork to
be streamlined, with different reports complementing each other. They are keen to be
involved in a test of change of the new paperwork.
From the feedback, a development plan has been produced (Appendices 1 & 2). Priority
ideas were identified (green) and staff noted how we should progress these areas (blue). 
The actions which follow from the development plan, will include actions from the Children’s
Services Joint Inspection Improvement Plan 2024 and the Children’s Service Plan 2023-
2026.  
The development and action plan will contribute to the overall plans for continual
improvement and self-evaluation which will reflect further learning needs. Progress will be
measured through the audit and evaluation programme. This can help ensure a continual
learning and development culture can start to be embedded.         
Author: 
Page 296

Page 297

APPENDIX 2
Continual Improvement and Development
Learning from Practice Report – January 2025  8 
Jim Lyon
Chief Social Work Officer/Head of Service 
Page 297

Page 298

APPENDIX 2
Continual Improvement and Development
Learning from Practice Report – January 2025  9 
Development Plan 2025 
induction   
Development
Staff Ideas (Priority
Areas)   
Streamlined
paperwork
Engaging the
child’s voice Processes and
Procedures
(P&P)
Improve
communication with
people receiving
our service and
other professionals
Updating
old P&P
Staff
included in
development 
Staff kept aware of
changes and how to
access P&P
Multi-agency
reflective case
discussions
Leaflets for families
explaining roles
and procedures
Development of
tool kit 
Current &
Relevant
Guidance
Review of
minutes and
referral forms
New core
assessment 
New P&P
developed in
response to 
Deleting
unnecessary
documents 
Improve working
across Children,
Justice & Adult
Services 
Stop silo working
Page 298

Page 299

APPENDIX 2
Continual Improvement and Development
Learning from Practice Report – January 2025  10 
Training in practice
areas
Joint training
Support for
NQSW and
SWIT
Quality Assurance 
Clear pathway of
support 
Guidance for
supervisors
Review and update
of current induction
programme
Quality assurance,
audits of current
practice and training 
Support to embed
current training
and models i.e.
Safe and Together
Partnership
training 
Joint Training with
different teams in,
Children Justice &
Adult Services 
Specialist areas i.e.
CSE, MH,
Substance use 
Exemplars of
good practice
(assessments,
chronologies etc)
Legal matters i.e.
Court Skills,
CPO’s 
Core Training
programme
identified
Core social work
skills
GIRFEC
training
Child Protection 
Development
Staff Ideas (Priority
Areas)   
Mock Children’s
Hearings 
Page 299

Page 300

APPENDIX 3 
Children and Families & Justice Services
Learning from Practice Action Plan 2025-2026 
The table below provides a description of the tasks required to complete the action plan.
Task  Descriptor
Benchmarking and Scope Gathering information by researching other Local Authorities and exploring within Moray,
including partner agencies, what information exists
Workforce Collaboration and Contribution Engaging with staff, team managers, service managers and partners by seeking their
views, involvement in short life working groups, and trialling new developments
Create Creating the item, can be before or after collaboration 
Launch Raise awareness through briefings, discussion at Policy, Development & Commissioning
(PDC) meetings, development sessions
Training Deliver training as required
Evaluate/Quality Assurance Evaluate feedback, quality assure work undertaken 
Page 300

Page 301

APPENDIX 3 
Action Plan 
Development
area                                     
Why are we doing
this?
What will we achieve  Benchmark &
Scope
Workforce
Collaboration
& Contribution
Create Launch Training Evaluate/
QA
The voice of
children and
young people
We want to be sure
that children and
young people can
influence their plans
and that their voices
are heard 
A toolkit for
practitioners  Feb 25 June 25 June 25 June 25  Nov 25
Guidance for
practitioners 
Feb 25 June 25 June 25 June 25  Nov 25
Development
area                                     
Why are we doing
this?
What will we achieve  Benchmark &
Scope
Workforce
Collaboration
& Contribution 
Create Launch Training Evaluate/
QA
Engagement
with people
who receive
services
To provide written
information for
children, young
people and their
families about the
social work role,
meetings they might
attend and processes
which might affect
them 
Child-friendly leaflets March 25 April 25 April 25 May 25  May 26
Leaflets that explain
social work role,
meetings and
processes
March 25 April 25 April 25 May25  May 26
Re-launch of existing
leaflets 
March 25  
Colour Key: 
Green – Completed
Amber – In Progress
Red –     Not started yet
Page 301

Page 302

APPENDIX 3 
Development
area                                     
Why are we doing
this?
What will we achieve  Benchmark &
Scope
Workforce
Collaboration
& Contribution 
Create Launch Training Evaluate/
QA
Engagement
with staff
For staff to be
involved and kept
aware of policy,
procedure and
training developments
Information flow
through PDC meetings  Monthly    
Newsletters    Every 4
months
starting
April 25 
April 26
To improve the
induction experience
for all new staff 
Redesign induction
programme
April 25 June 25 June 25 Aug 25  Jan 26
Development
area                                     
Why are we doing
this?
What will we achieve  Benchmark &
Scope
Workforce
Collaboration
& Contribution 
Create Launch Training Evaluate/
QA
Training To provide
opportunities for staff
to attend training and
learn with other
professionals
Promote partnership
training and information
sharing  Monthly at PDC
meetings    
For staff to develop
their skills and
knowledge to improve
their practice
Child Protection
Training Feb 25 April 25 April 25 
Start
module 1
May 25
Dec 26
Permanence Training April 25 June 25 July 25  Sept 25 March 26
Embedding of Safe and
Together  March 25  
Forums
April 25
onwards
Nov 25
Embedding of Graded
Care Profile 2  March 25  Re-launch
May 25
April 25,
then Nov 25
Page 302

Page 303

APPENDIX 3 
every 2
months 
Development Training 
Chronologies April 25 May 25 May 25  May 25 Dec 25
Assessments  April 25 May 25 May 25  May 25 Dec 25
Analysis April 25 May 25 May 25  May 25 Dec 25
Action Plans April 25 May 25 May 25  May 25 Dec 25
Specialist Training 
Mental Health April 25 May 25 June 25  Sept 25 Jan 26
Substance Use April 25 May 25 June 25  Oct 25 March 26
Sexual Harmful
Behaviour  March 25   April 25 
Trauma Informed
Practice Sep 24 Oct 24 Sep 24 June 25 June 25 Oct 25
Contextual
Safeguarding Training      
Risk, Vulnerability &
Exploitation Sept 24 Feb 25 Oct 24  April 25 Nov 25
Child Sexual
Exploitation Sept 24 Feb 25 Oct 24  April 25 Nov 25
Gangs & County Lines Sept 24 Feb 25 Oct 24  April 25 Nov 25
Development
area                                     
Why are we doing
this?
What will we achieve  Benchmark &
Scope
Workforce
Collaboration
& Contribution 
Create Launch Training Evaluate/
QA
Page 303

Page 304

APPENDIX 3 
Newly
Qualified
Social
Workers
(NQSW) &
Social
Workers in
Training
(SWIT) 
To ensure all social
work staff meet their
learning requirements
to enable them to be
confident and
competent
practitioners 
A programme for
NQSW & SWIT to meet
their learning
requirements
Jan 25 April 25 March -
April 25 June 25  Dec 25
Guidance for those who
support NQSW and
SWIT
Jan 25 April 25 March -
April 25 June 25  Dec 25
Development
area                                     
Why are we doing
this?
What will we achieve  Benchmark &
Scope
Workforce
Collaboration
& Contribution 
Create Launch Training Evaluate/
QA
Supervision For staff to have
regular and reflective
supervision
Update of paperwork
and procedure  Feb 25 Update
May 25   May 26
Supervisors are trained
and using the 4x4x4
model   
Re-
advertise
June 25 
Dec 25
Supervisees
understand the 4x4x4
model 
Re-
advertise
June 25 
Dec 25
Development
area                                     
Why are we doing
this?
What will we achieve  Benchmark &
Scope
Workforce
Collaboration
& Contribution 
Create Launch Training Evaluate/
QA
Streamlining
paperwork
To improve the quality
of assessments and
reports by using one
agreed template
based on the National
Practice Model
A core assessment and
report template 
Jan 25 Started Jan 25 March
25 May25  Dec 25
To reduce the A singular form for April 25 April 25 May 25 June 25  Dec 25
Page 304

Page 305

APPENDIX 3 
workload of staff referrals 
For consistency and
ease of use
A singular minute
template  April 25 April 25 May 25 June 25  Dec 25
To provide clarity on
assessments and
improve the quality of
assessments we
undertake 
A clear range of
assessments additional
to the core assessment
and report template  Started March 25  June 25  Dec 25
Development
area                                     
Why are we doing
this?
What will we achieve  Benchmark &
Scope
Workforce
Collaboration
& Contribution 
Create Launch Training Evaluate/
QA
Policies &
Procedures
To support staff to
undertake their role
Update out of date
policies and
procedures 
Transitions April 24 Aug 24 June 24 May 25 June 25 Jun 27
Continuing Care April 24 Aug 24 June 24 May 25 June 25 Jun 27
LAC Manual  Started May 23    
Learning from practice
for reviewing officers  
Review
Nov
2025  
Nov 27
Escalation procedure   Review
Dec 25   Dec 27
Smoking Policy for LAC
- Foster and LA
residential care settings
Nov 24 Jan 25 Nov 24 April 25  Jul 27
Alcohol Policy for LAC -
Foster and LA
residential care settings
Jan 25 Feb 25 March
25 May 25  May 27
Drug Use Policy for
LAC - Foster and LA
residential care settings
Jan 25 Feb 25 March
25 May25  May 27
Page 305

Page 306

APPENDIX 3 
Case recording 
Jan 24 Dec 24 May 25  May 27
Create new policies
and procedures as
required 
Supported lodgings Nov 24 Jan 25 March
25 Aug 25  Aug 27
Kinship Feb 25 April 25 June 25 July 25  June 28
Inter-agency Team
around the Child Feb 25 Started April 25    
Significant occurrence
Jan 25  March
25 April 25  April 27
Referrals involving staff
Feb 25  March
25 May 25  Aug 27
Flow charts and
checklists To be included with updates and new policies and procedures
Policies and
procedures to have a
trauma informed lens
All updates, new policies, and procedures to be reviewed by Trauma Informed Lead
Promote use of multi-
agency reflective case
discussions to support
better outcomes for
children 
May 25  Re-launch
June 25  Dec 25
Development
area                                     
Why are we doing
this?
What will we achieve  Benchmark &
Scope
Workforce
Collaboration
& Contribution 
Create Launch Training Evaluate/
QA
Quality
Assurance &
Audit Activity
To ensure
consistency and
promotion of good
A calendar of quality
assurance activity
across the year
Feb 25 April 25 May 25 June 25  Dec 25
Page 306

Page 307

APPENDIX 3 
practice 
Page 307

Page 308

Page 308