Agenda Document Pack - Community Wealth Building Commission - 12/12/2023

South Lanarkshire Council · 12 December 2023
Back to Community Wealth Building Commission — 12 December 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 04 December 2023 
Dear Member 
Community Wealth Building Commission 
The Members listed below are requested to attend a meeting of the above Board to be held
as follows:- 
Date:  Tuesday, 12 December 2023
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
South Lanarkshire Council
Councillor Alex Allison
Councillor Robert Brown
Councillor Margaret Cooper
Councillor Joe Fagan (Chair)
Councillor Kirsten Robb
Councillor John Ross
Councillor Margaret B Walker
Cleland Sneddon, Chief Executive
Paul Manning, Executive Director (Finance and Corporate Resources)
Soumen Sengupta, Director, Health and Social Care 
Jann Gardner, Chief Executive, NHS Lanarkshire
Josephine Pravinkumar, Director of Public Health, NHS Lanarkshire
Hisashi Kuboyama, Development Manager, West of Scotland, Federation of Small
Businesses
Steven Sweeney, Chief Executive, VASLan
Thomas Adamson, Estates Environment Manager, University of the West of Scotland
(UWS) 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community Wealth Building Commission
held on 5 September 2023 submitted for approval as a correct record.
(Copy attached) 
3 - 10 
Item(s) for Consideration 
3 Larkhall Plan Partnership
Report dated 23 November 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
11 - 14 
4 Community Wealth Building Action Plan: Q2 Update
Report dated 14 November 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
15 - 34 
5 Community Wealth Building and Neighbourhood Planning
Report dated 24 November 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
35 - 40 
6 Context for Community Wealth Building: Data Digest
Report dated 2 November 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
41 - 50 
7 Food Procurement Findings of the Market Capacity Assessment and
Next Steps
Report dated 22 November 2023 by the Executive Director (Community
and Enterprise Resources). (Copy attached) 
51 - 64 
8 Forward Programme for Future Meetings
Report dated 23 November 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
65 - 68 
Any Other Competent Business 
9 Any Other Competent Business
Any other items of business which the Chair decides are competent. 
For further information, please contact:-
Clerk Name: Helen Calley
Clerk Telephone: 07385370069
Clerk Email: helen.calley@southlanarkshire.gov.uk 
2

Page 3

COMMUNITY WEALTH BUILDING COMMISSION 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 5 September 2023 
Chair:
Councillor Margaret B Walker 
Present:
South Lanarkshire Council
Councillors Robert Brown, Margaret Cooper, Kirsten Robb, John Ross
NHS Lanarkshire
J Pravinkumar, Director of Public Health
University of the West of Scotland
T Adamson, Estates Environmental Manager
VASLan
S Sweeney, Chief Executive Officer 
Also Attending:
South Lanarkshire Council
Community and Enterprise Resources
F Carlin, Head of Planning and Regulatory Services; I Ross, Project Manager
Finance and Corporate Resources
H Calley, Administration Officer; C Fergusson, Head of Finance (Transactions); T Little, Head of
Communications and Strategy; G McCann, Head of Administration and Legal Services; K McLeod,
Administration Assistant; N Reid, Improvement and Community Planning Manager 
Apologies:
South Lanarkshire Council
Councillors Alex Allison and Joe Fagan (Chair)
C Sneddon, Chief Executive; P Manning, Executive Director (Finance and Corporate Resources); S
Sengupta, Director, Health and Social Care
Federation of Small Businesses
H Kuboyama, Development Manager, West of Scotland
NHS Lanarkshire
J Gardner, Chief Executive 
1 Declaration of Interests
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Community Wealth Building Commission held on 6 June 2023
were submitted for approval as a correct record. 
The Commission decided: that the minutes be approved as a correct record. 
3 Community Wealth Building Action Plan 2023 Refresh
A report dated 17 August 2023 by the Executive Director (Finance and Corporate Resources)
was submitted on the draft Community Wealth Building (CWB) Action Plan 2023/2024.
2
3

Page 4

At its inaugural meeting on 31 August 2021, the Commission approved an action plan to
accompany the CWB Strategy.  Following presentation of the latest Q4 report, the action plan
was reviewed to remove completed actions and to refresh the remaining actions for year 3 of the
Strategy. 
The refreshed Action Plan would continue to be monitored and reported through the Improve
system, with updates provided to the Commission at Q2 and Q4. 
Officers responded to members’ questions on various aspects of the report. 
The Commission decided: that the report be noted. 
[Reference: Minutes of 31 August 2021 (Paragraph 5)] 
4 Community Wealth Building Annual Report 2022/2023
A report dated 17 August 2023 by the Executive Director (Finance and Corporate Resources)
was submitted presenting a draft of the Community Wealth Building (CWB) annual report for
2022/2023. 
The Council approved a CWB Strategy on 10 March 2021, resulting in the formation of the CWB
Commission to engage a wide range of partners and stakeholders in the CWB agenda.  To
support formal reporting of progress against the Strategy, the Commission agreed, on 7
February 2022, that annual reports would be produced to highlight progress and showcase
examples of significant work under the 5 pillars.   
The annual reports also provided a vehicle for communicating the purpose of CWB and why the
Council and partners considered that CWB was an important way of working in South
Lanarkshire.  The first annual report, covering year 1 of the Strategy, was presented in final form
to the Commission in September 2022. 
The draft Annual Report, covering April 2022 to March 2023, was presented as Appendix 1 to
the report. 
In August 2021, the Commission agreed to monitor the CWB action plan through progress
reports at Q2 and Q4, however, the Commission also agreed there was scope to reach a wider
audience and to enhance communications around the CWB agenda by presenting progress in a
more accessible format.  An annual report offered the opportunity to present what had been
achieved and to restate the aspirations of the Council and partners to champion CWB across all
aspects of service planning and delivery. 
The annual report did not replace the formal reporting of Q2 and Q4 progress but allowed a
more public-facing and accessible presentation of information, using key points and case
studies to illustrate CWB in action.  The structure and content of the annual report were
summarised in the report. 
Officers responded to members’ questions on various aspects of the report. 
The Commission decided: that the report be noted. 
[Reference: Minutes of 7 February 2022 (Paragraph 6)]
4

Page 5

5 Spatial Planning and Community Wealth Building
A report dated 28 July 2023 by the Executive Director (Community and Enterprise Resources)
Resources) was submitted:- 
 providing an update on the direction of the spatial planning policy on Community Wealth
Building (CWB), as set out in National Planning Framework 4 (NPF4)
 summarising the process involved in the preparation of the Council’s next Local
Development Plan (LDP) and the key issues the plan would address in terms of
Community Wealth Building 
The Planning (Scotland) Act 2019 set out the legislative response to the transformation of the
planning system the Scottish Government was developing.  It included the introduction of a
statutory requirement for the Scottish Government to prepare and adopt a new NPF which,
unlike previous versions, would form part of the development plan alongside the Council’s LDP. 
It meant all planning decisions, including the preparation of LDPs and the determination of
planning applications, had to accord with NPF4.   
The Act also set out the legislative requirements for a new style of LDP and the report focused
on the issues in relation to CWB. 
NPF4 was the Scottish Government’s National Spatial Strategy for Scotland to 2045, the aims
and details of which were detailed in the report.  In relation to CWB, NPF4 encouraged,
promoted and facilitated a new strategic approach to economic development that provided a
practical model for building a wellbeing economy at local, regional and national levels.   
LDPs would be aligned with the strategy for CWB for their area and would address CWB
priorities, identify community assets, set out opportunities to tackle economic disadvantage and
inequality and seek to provide benefits for local communities.  Further details of LDPs were
included in the report. 
At its meeting on 8 August 2023, the Planning Committee gave its approval for officers to start
preparation of a third LDP for South Lanarkshire (LDP3).  LDP3 would take account of NPF4
and the Council’s Community Plan.  The report gave further information on LDP3 which would
include a delivery programme and be place-based and people-centred.   
An evidence report would be prepared at the start of the plan-making process and used to
inform plans, before the proposed Plan looked at where new development would take place.   
The Council was also required to invite community bodies to prepare a Local Place Plan for their
area at the start of the evidence report process, to allow local communities to set out their
aspirations for local improvement in order to feed into the development plan process. 
The newly published guidance provided advice on the information to be gathered and
considered.  For CWB, this included the location, use and condition of community assets, the
CWB priorities that had been identified for the area and the identification of areas of economic
disadvantage and inequality.  Both the CWB and Social Enterprise Strategies were relevant to
that context.  Using the data gathered, the evidence report would show how a wellbeing focused
local economy would be developed. 
The report provided the next steps being taken in relation to the LDP3 evidence report, the
direction of LDP3 and preparing the delivery programme. 
Officers responded to members’ questions on various aspects of the report. 
The Commission decided: that the report be noted.
5

Page 6

6 Town Centres Strategic Update
A report dated 27 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on town centre activity. 
The nature of town centres across the UK was in a transitional stage.  The issues town centres
were facing included the economic downturn, internet shopping, the growth of out of town
shopping malls, changes in retailers’ business models and consumer expectations that had
resulted in a decline in footfall.  Some of the issues were local and specific to individual towns,
however, many were seen across the country influenced by wider economic patterns, consumer
behaviour and corporate decisions.   
Supporting town centres remained a Council priority and officers continued to work, in
partnership with groups and organisations in each town, to achieve common goals. 
The contribution town centres made to communities could not be overstated and with around
70% of businesses and jobs in the economy located in town centres, they were often the
principal location for leisure and hospitality.   
Across the 10 towns defined in the South Lanarkshire Local Development Plan (LDP), there
was active and ongoing engagement with the most appropriate groups in each town.  Town
Centre strategies and action plans had been prepared and approved for Hamilton, Cambuslang,
Larkhall and Blantyre, with work underway in Rutherglen.   
Similar plans were being progressed by the communities in Lanark and Carluke along with the
master planning work by the owners of East Kilbride.  In Strathaven, the Conservation Area
Regeneration Scheme (CARS) had been completed and funding for a significant project in
Biggar had been approved.  A review and refresh of the Hamilton strategy was ongoing. 
Those strategies and action plans were closely aligned with the Scottish Government’s
approach to town centres captured in the New Future for Scotland’s Town Centres report and
action plan. 
Officers in Economic Development were working with all key stakeholders across towns and
had commissioned 2 key pieces of work to set the direction of the Council’s work around town
centres going forward.  Town Centre Visioning and Transition to Net Zero would inform and
align with existing and emerging funding opportunities around town centres. 
Officers in Enterprise, Planning and Community Engagement were working with colleagues
from the Improvement Service on a pilot project in Rutherglen called Shaping Places for
Wellbeing.  The project was working in 7 towns across Scotland, taking a multi-agency
approach to placemaking.  The initiative was still in its early stages, however, it was hoped it
would become a useful model for working with communities across South Lanarkshire. 
There were a number of key areas of work underway in support of town centres which would
inform the investment strategies and priorities going forward for the next 5 to 10 years.  This
work would also support and inform potential Levelling Up Funding and other external funding
bids. 
Details of the East Kilbride Town Centre Masterplan, Hamilton Town Centre Masterplan, Place
Based Investment Programme, including the agreed allocation and Town Centre Living were
included in the report. 
The Commission decided: that the report be noted.
6

Page 7

7 Community Wealth Building Charter
A draft report dated 28 July 2023 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on town centre activity. 
The South Lanarkshire Community Wealth Building (CWB) Strategy aimed to develop resilient,
inclusive local economies, with more local employment and a larger and more diverse business
base.  It set out South Lanarkshire’s ambitions across each of the 5 pillars of CWB. 
At its meeting on 28 February 2023, the Commission considered examples of how charters and
anchor frameworks had been used in different localities to support CWB and it had been agreed
that the aims of the South Lanarkshire CWB Strategy could be advanced by the development of
a local CWB Charter. 
The CWB Progress Group was tasked with developing a draft Charter and associated
recommendations.  The draft CWB Charter was included at Appendix 1 to the report, along with
proposals from the Progress Group relating to its communication, roll-out and uses.   
The Charter articulated a “charter pledge” for each of the CWB pillars, which were drawn from
statements already contained within the South Lanarkshire CWB Strategy for each pillar,
however, they were in a more straightforward language and in most cases, could be supported
both at an organisational/collective level or on a personal basis. 
To illustrate the pledges, the Charter provided examples of actions which could be taken to
support them.  Additional points to note about the Charter included:- 
 it covered all 5 pillars 
 it was firmly based on the South Lanarkshire CWB Strategy 
 it was designed to be “at a glance”, not a lengthy or complex document 
If approved, the Charter would be given appropriate branding and uploaded onto the Council’s
CWB webpage.  Details on additional promotion to raise awareness, boost engagement and
realise benefits of the Charter were included in the report. 
Officers responded to members’ questions on various aspects of the report. 
The Commission decided: that the report be noted. 
[Reference: Minutes of 28 February 2023 (Paragraph 5)] 
8 Third Sector and Community Wealth Building 
A report dated 17 August 2023 by the Chief Executive Officer (Voluntary Action South
Lanarkshire (VASLan)) was submitted providing an update on third sector perspectives of
Community Wealth Building (CWB). 
VASLan was the Third Sector Interface (TSI) for South Lanarkshire and its vision, mission and
values were detailed in the report.  VASLan had 4 main functions as a TSI which were to build
capacity, facilitate sector voices, connect partners and be a source of and for third sector
intelligence.  Its current organisational strategy “Moving to Action 2022-24”, had 6 strategic
objectives which were detailed in the report. 
As part of VASLan’s strategic engagement role, it represented the third sector locally and cross-
sector with Community Planning Partners.  VASLan had a seat on the CWB Commission since
its inception and had chaired the CWB Progress Group since January 2022 which, to date, had
been very local authority driven but with an openness for cross-sector partner contributions. 
The report aimed to outline the third sector’s relationship with CWB to date.
7

Page 8

Details of the sector’s economic contribution to South Lanarkshire by locality annual revenues,
numbers of employees and volunteering were detailed in the report.  It was suggested that this
data could complement both the area profiling tool and locality discussions. 
An overview was given on the current context of the public sector and other bodies.  The third
sector, volunteers, community organisations and social enterprises, were VASLan’s line of sight
for what was happening within communities and data was provided which framed progress to
date against the strategic objectives. 
The Third Sector Locality Networks, supported by the Health and Social Care Partnership, were
formed in the summer of 2022 as part of VASLan’s voice and to influence work to ensure the
third sector was heard.  The Networks replaced the Locality Forums and had increased
autonomy and direction provided by lead third sector partners, as opposed to VASLan itself. 
Consistent feedback from all localities suggested there was a lack of awareness of what CWB
was and how people could be involved.  This identified a clear gap and need for a partnership
approach in better engaging with communities to increase participation at a local level.  In
response to this, in spring 2023 further engagement sessions were held with third sector
partners to better understand how they would like VASLan to support communities improve their
understanding and participate in CWB as well as 2 sessions held in partnership with NHS
Lanarkshire.  With the development of a CWB Charter, it was important that those sessions
were followed up with in person conversations. 
Therefore, it was proposed that:- 
 partners collaborate on community engagement activities to promote CWB and that the
Scottish Government/COSLA’s Local Governance Review (LGR) provide an opportunity to
start this piece of work 
 CWB be added to a Community Planning Partnership programme of community
engagement that was scheduled to take place across September and October 2023 to
discuss shared decision-making in the context of the LGR 
The Social Enterprise Strategy and Action Plan were presented to the CWB Commission in
June 2023.  South Lanarkshire Council and VASLan had generated some quick wins to build
momentum which were detailed in the report. 
The Social Enterprise Network had set out its priorities, as outlined in paragraph 7 of the report. 
At its second meeting, members agreed that the Network should be more ambitious and its
voice should be heard. 
Further weightings towards Social Enterprises would be welcomed to aid participation in the
competitive environment for contracts.  In addition, with the acknowledgement that often what
was being bought and sold did not always align, a need for flexibility and adaptation of business
models for market potential needed to be realised. Encouragement for Social Enterprises to flex
their model, with a fair chance of winning contracts for products and services whilst retaining
their social value and impact, would accelerate how CWB was built in South Lanarkshire. 
It was suggested that additional research be undertaken to understand the gaps between what
was being bought and sold locally in order to support local Social Enterprises to realise the
market opportunity. 
The Commission decided: that the report be noted.
8

Page 9

9 Forward Programme for Future Meetings
A report dated 16 August 2023 by the Executive Director (Finance and Corporate Resources)
was submitted advising of the forward programme for meetings of the Commission and inviting
members to suggest topics for inclusion in the Commission’s forward programme. 
The Commission decided: that the report be noted. 
10 Any Other Competent Business
There were no other items of competent business.
9

Page 10

10

Page 11

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 12 December 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Larkhall Plan Partnership 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the Larkhall Plan Partnership (LPP) to the Commission, outlining its work
as an example of effective community partnerships and potential contributor to
Community Wealth Building (CWB)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) note the content of the report and a presentation by the LPP
(2) consider an invitation to visit Larkhall, meet some of the people involved and
see what is being achieved
[1recs]
3. Background
3.1. The community of Larkhall is in a unique geographic position, being close to the
urban area of Hamilton, while on the edge of the rural Clyde Valley. 
3.2. It is a Community Growth Area, with the population expected to increase by 25% to
an estimated 17,000 in the next 5 to 10 years, which will bring challenges, coming at
a time of financial pressure on public services. 
3.3. The LPP was established in 2018, on behalf of the Larkhall community, partly to
respond to those challenges but primarily as a group determined to focus on the
opportunities that may present themselves in the future.  It has had a considerable
impact on the operational and strategic developments in the town, in partnership with
the statutory sector and as a stand-alone organisation. 
4. Current Position
4.1. The LPP works in partnership with Larkhall Community Network, which was
established as part of the local community’s response to the Covid-19 pandemic.
Together they comprise a partnership of third, public and private sector
organisations. 
4.2. The LPP views CWB as an opportunity from which local groups can benefit and to
which they can contribute. 
4.3. The LPP provides a structure that enables creative thinking and project
development, enhancing all aspects of community life, building strong partnerships
and healthier, more prosperous communities in Larkhall and the surrounding areas
and villages.
3
11

Page 12

4.4. The LPP’s presentation to the Commission will share its vision of what it hopes CWB
will mean for Larkhall.  The LLP hopes that Commission members will recognise the
value of the contribution voluntary organisations can bring to the CWB agenda. 
5. Next Steps
5.1. The LPP has issued an invitation to the Commission or a delegation, to visit Larkhall.
This would provide the opportunity to view plans to develop community spaces, meet
some of the people involved and see what is being achieved. 
5.2. The LPP urges the Commission to deliver a partnership plan that enables and
empowers communities to become strong, healthy, and prosperous and makes an
offer to engage in those activities. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. There are no financial implications associated with this report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
9. Other Implications
9.1. There are no risk or other implications associated with the content of this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. There are no Equality Impact Assessment or consultation implications associated
with this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
24 November 2023 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
12

Page 13

 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy, South Lanarkshire Council
Ext: 4904   (Tel: 01698 454904)
E-mail: tom.little@southlanarkshire.gov.uk
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 12 December 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Wealth Building Action Plan: Q2 Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 present the Q2 progress update on the Community Wealth Building (CWB)
Strategy Action Plan 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) that the contents of the report, be noted
3. Background
3.1. The Commission approved the 2023/2024 Community Wealth Building Action Plan
at its meeting on 5 September 2023. 
3.2. This report presents an update on the actions contained within the Action Plan for
the 6 month period April 2023 to the end of September 2023.
4. Progress Update
4.1. In line with the reporting arrangements for other key plans and strategies, the CWB
Action Plan has been uploaded to the performance reporting system, Improve. 
4.2. There are 72 actions within the CWB Action Plan for 2023/2024.  Progress to date
against each of these actions is shown in the CWB Quarter 2 Performance Report
2023/2024, attached as Appendix 1.   
4.3. This report uses a traffic light format, with the following definitions, to give a status
report on each measure:- 
Status Definition
Blue Action complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available 
4.4. The overall summary of progress to date is as follows:-
4
15

Page 16

Status Actions
Number %
Blue 1 1%
Green  67 93%
Amber  0 0%
Red  0 0%
Report later 4 6%
Totals  72 100% 
4.5. A full-year (Q4) report on progress against the Action Plan will be brought to a future
meeting of the Commission. 
5. Employee Implications
5.1. There are no direct employee implications. 
6. Financial Implications
6.1. There are no direct financial implications. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
8. Other Implications
8.1. None. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
14 November 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 CWB Commission Report – CWB Action Plan 2022 Refresh 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk
16

Page 17

IMPROVe - SLC Performance Management System Report printed on 22 Nov 17:31
Quarter 2 : April 2023 - September 2023
(This represents the cumulative position to September 2023)
Performance Report 2023-24
Community Wealth Building - Plan
4
17

Page 18

Summary - number of detailed actions complete, green, amber and red under each Community
Wealth Building Pillar
Community Wealth Building Pillars Complete Green Amber Red Report later Total
Spending 0 25 0 0 2 27
Workforce 0 15 0 0 0 15
Land and property 0 20 0 0 1 21
Finance 1 1 0 0 0 2
Building the generative economy 0 6 0 0 1 7
Total 1 67 0 0 4 72
18

Page 19

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
Provide support to local
sectors based on an
assessment of current
capabilities ensuring
support from Supplier
Development
Deliver training events on public sector procurement for
relevant contracts including quick quote
Talking Tenders - Care at Home with South Lanarkshire Council face
to face event held on 9 August. At the event there was 47 bookings
and 29 attended. The follow up aligned tender training is awaiting a
date  to take place.
Ongoing suite of SDP training still being promoted and delivered.
Green
Programme. Increase the level of spend with local companies Annual spend with local enterprises will be reported at the end of
2023/2024
Report Later
Increase the number of registrations with Public Contracts
Scotland tendering portal
Current SLC PCS registrations (as at October 3) is 1487
This is a 16.6% increase from the benchmark date of November 2022
Green
Increase the number of registrations with Supplier
Development Programme
Ongoing through engagement events, publicity and professional
networks
Green
Increase the contracts awarded to local companies To be reported at the end of 23/24 Report Later
Promotion of free procurement training aligned with the
continued support of the SDP ensuring that all Business
Gateway advisers are aware of the programme and what it
delivers.
Ongoing promotion of SDP to BG Advisers and also when meeting
with businesses alongside BG Advisers.
Face to face meeting on 15 November with all BG Advisers at which
the services of SDP will be promoted
Green
Supplier Development Programme to assist SMEs to
develop the required suite of supporting policy and practical
documentation to submit bids for council works contracts.
SDP ongoing suite of training courses and specific events such as
meet the buyer contribute to this continuing to be delivered
Green
19

Page 20

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
Continue to review the range of support provided to
businesses wishing to engage and identify measures to
increase capability.
Economic Development have launched an Expert Help programme
which allows businesses access to consultants to offer support on a
121 basis re the following topics:
Financial Management
Business Development
Human Resources, Leadership and Skills
Procurement
Marketing
Information and Digital Technology
Energy Efficiencies and Net Zero
New Market Opportunities and Internationalisation
Green
Report on the findings of the Market Capacity Assessment to
understand the capability of the food and drink sector to
supply food and drink to the council.
Outcome of the market capacity assessment were presented at the
Climate Change and Sustainability Committee on 20 September 2023
as well as the next steps (i.e. action plan). Actions include continuing
engagement with businesses identified; exploring the possibility to use
the Quick Quote process to increase the supply of local food and drink
in specific South Lanarkshire Leisure and Culture venues; identifying
and analysing practices developed in other comparable local
authorities; delivering the business accelerator programme “Eat South
Lanarkshire”; supporting discussion with the food and drink network
"Lanarkshire Larder"; and promoting sub-contracting opportunities.,
Report to be presented to the December meeting of the CWB
Commission
Green
Assess local markets,
their existing capacity
and willingness of
Encourage local suppliers to bid for Scotland Excel and
HubSW contract opportunities
Successful delivery of Build Lanarkshire programme which was
delivered in the premises of, and with face to face input from, Tier 1
HSW companies
Green
business to grow
together with the
identification of
Promote the council’s contract register as a source of
information to interested parties
The Council's contract register is available online and Economic
Development have publicised availability through social media
channels and in supplier events.
Green
20

Page 21

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
appropriate contract
opportunities.
Identify opportunities for local SME's to increase spend
working with various agencies.
Work is ongoing within the council and across anchor organisation to
identify opportunity to increase local spend.
Officers are also working with businesses across sectors to increase
and improve capacity to secure these opportunities.
It must be recognised this is in a backdrop of reducing spend across
anchor organisations  due to financial pressures.
Green
Identify the opportunities presented from the review of the
Grow Local management information that should allow more
local business to bid for prospective work.
Grow local reports were distributed to procuring services for
consideration of procurement opportunities. This activity is
supplemented by ongoing activity from Economic Development,
Procurement and procuring Resources
Green
Enact the changes necessary to the council contract terms
and conditions to capture levels of sub-contracting spend
will form part of the review of the Council's standard terms and
conditions due to commence in early 2024
Green
Assess those
procurement
opportunities where
pre-market engagement
Utilise support from Supplier Development Programme to
facilitate market engagement, using their marketing and
social media channels, plus webinars and early engagement
events.
Continue to work very closely with SDP on the delivery of their portfolio
of training and networking events
Green
would be considered
beneficial.
Maintain liaison with Tier 1 contractors to promote SME
engagement for sub-contract opportunities and, where
possible, obtain details of successful awards
Build Lanarkshire 2024 currently being devised Green
Earlier identification of potential contracts and cascading of
this information to the relevant businesses.
The Council continue to work with the Supplier Development
Programme for supplier engagement events for tender opportunities.
Relevant tenders are published on social media by Procurement and
Economic Development.
Green
Use a range of
communication methods
to advertise
opportunities to potential
Conduct supplier events and increase the use of social
media.
Talking Tenders - Care at Home with South Lanarkshire Council face
to face event held on 9 August
Ongoing suite of SDP training still being promoted and delivered
Green
21

Page 22

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
bidders. Supplier Development Programme to raise market
awareness of opportunities using their marketing and social
media channels, plus webinars.
SDP work  closely with Procurement and Economic Development to
highlight contract opportunities and deliver relevant aligned tender
training webinars
Green
Specific promotion of quick quote opportunities. Economic Development and Procurement have referred potential
suppliers to specific services and buyers  for consideration in future
tenders.
Economic Development input into events or presentations that include
the topic of procurement advise SLC can instruct quick quotes of up to
£2m for works and that, where possible, four out the five invited will be
located in South Lanarkshire
Green
Review of the detailed feedback from SDP following the
Meet the Real Buyer event.
The post-event survey highlighted that 94% of Scottish SMEs were
more likely to bid for public sector contracts after participating in the
Lanarkshire Meet the “Real” Buyer event
Discussions ongoing re delivery of a similar event in 2024
Green
Review sustainability
requirements for
contracts
Progress the Flexible Framework Sustainability action plan to
further embed good procurement practice.
The Flexible Framework was reviewed at the end of September and
actions for the remaining 6 months prioritised as implementation of
new Sourcing Strategy and Sustainable Procurement checklist for
tenders.
Green
Identify those anchor
organisations willing to
participate and promote
Complete an exercise to identify common areas of interest
with other anchor organisations.
Activity planned for second half of 2023/24. Green
contract opportunities to
local SMEs and social
enterprises.
For our lower value procurement processes NHS
Lanarkshire will ensure, where possible, that at least half of
the suppliers invited to quote are based in the Lanarkshire
area.
The practice of ensuring half of the suppliers invited to quote are
based in the Lanarkshire area was included in the health board’s
organisational procurement strategy published in 2022 and is now
embedded as a business as usual process.
Green
Review of the changes
to delivering increased
levels of community
benefits and
Implementation of community benefits monitoring system. Contract awarded and configuration work has started with go live
anticipated for March 2024.
Green
22

Page 23

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
identification of new
opportunities to improve
community outcomes
Monitor the wish lists delivered from community benefits. The community wish list has been embedded in the Council's
community benefits menu for new tenders and suppliers have
contributed 5 fulfilled wishes to date.
Green
Consideration of the
changes that could be
made to the way
contractual opportunities
are presented to the
market and evaluated in
support of community
wealth building
objectives
Review the contract evaluation criteria for regulated spend
and potential for increasing tender opportunities for local
business.
Draft report prepared for consideration by the Spend Pillar Working
Group
Green
Workforce
High level action Detailed actions Comments/Progress Status
Ensure that all Anchor
organisations including
South Lanarkshire
Council have adopted
the Living Wage as well
as Living hours and fair
work practices
We will continue to advocate the Living Wage and work on
developing living hours along with our Community Planning
Partners and Anchor Organisations
The pan Lanarkshire Living Wage Campaign Group meets quarterly to
ensure focus in this key area. Currently there are 163 Living Wage
employers in South Lanarkshire and 128 in North Lanarkshire.
Green
Support our local
businesses to create fair
working practices
Continue to ensure that all businesses and third sector
organisations who engage with the Council are encouraged
to adopt the Living Wage and a fair work approach to
employment practices.
Colleagues in Economic Development continue to engage and
encourage all employers to pay the Living Wage. This involves liaising
with partners such as Skills Development Scotland and Routes to
Work South.
Green
Provide webinars and support to understand impact of Fair
Work, for employers and communities.
South Lanarkshire have achieved their 150th Living Wage Employer,
this will be celebrated with the employer. Work is on-going regarding
promotion of the living wage week with employers this takes place w/c
06 November 2023.
Green
23

Page 24

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Workforce
High level action Detailed actions Comments/Progress Status
We will improve the
percentage of applicants
from South Lanarkshire
SIMD areas who secure
work with Living Wage
accredited employers
Our employability projects will work with managers to identify
pre employment training and skills required for entry level
jobs as well as building on existing work to prepare our local
residents for interview and improve their employability.
Next SLC recruitment fair planned for January 2024.
Gateway Team has hosted 4 Jobs Fairs in Cambuslang and East
Kilbride providing opportunities for clients to be matched to vacancies
with employers and raising awareness of RTWS services to register
new clients.
Green
We will continue to
deliver employability
programmes which help
local residents into work.
We will map the extent of employability support with partners
- identifying strengths, gaps and areas for development.
The SL Local Employability Partnership has reviewed delivery and
submitted an Investment Plan for delivery across 23/24 with a focus on
the following key groups:
-Young people in the last 6 months of school
-Young people aged 16-19
-Adults with barriers to employment
-Young people and adults with additional support needs
-Parents in the Scottish Government’s priority groups
Green
Work with our own
services and public and
private sector partners
to identify the skills they
need to grow and create
wealth in the local
economy, including skills
needed for the transition
to a net-zero economy.
We will work with our own services and with partners on our
Local Employability Partnership, local business organisations
including Federation of Small Businesses and Lanarkshire
Chamber of Commerce. The purpose is to consult with these
communities – gathering data on their immediate as well as
future skills needs. We will develop existing relationships
with Scottish Enterprise, Business Gateway and Skills
Development Scotland to ensure that up to date labour
market and demand led data is informing our plans and
developing our skills and knowledge training
A LEP operational sub-group has been established to co-ordinate local
delivery and respond to emerging gaps.
The employability team have been working in partnership with NHS
Lanarkshire and Routes to Work South to develop the ‘Demonstrator’
programme, creating 6 month paid work experience opportunities at
NHS sites targeted at unemployed parents.
Green
Be responsive to
business and Social
Enterprise needs
We will further develop our Upskilling programme to ensure it
is meeting demand led skills requirements and qualifications
from local SMEs and Social Enterprises in particular.
We have reviewed the Upskilling programme to provide increased 1 to
1 keywork support to parents through the Scottish Governments
Tackling Child Poverty programme
Green
24

Page 25

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Workforce
High level action Detailed actions Comments/Progress Status
We will work with new businesses to ensure residents are
upskilled prior to launch date through pre-employment
training and employability support.
Routes to Work South have delivered a range of pre-employment to
tackle skills shortages across industries and upskill clients several
sector specific routeways have been run for bus driving, contact
centre, construction, and care industries
Green
Promote the Council
and partners as an
‘Employer of Choice’
highlighting our
excellent Terms and
Conditions and
opportunities for flexible
working.
Build on work ongoing with Targeted recruitment in
Employability Services, ensuring that applicants are
supported to apply for vacancies with the council and
partners as well as receiving pre-employment training where
required. Use available funding to support job opportunities
for local people within council.
Employability team continue to work with participants to support
applications to SLC vacancies.
Green
Continue to support
local residents and
businesses through our
extensive employability
programme of support
We will continue to work with local companies and residents
to ensure we reach the best fit of local vacancies to skills.
Investing in training and employability support where
required.
As part of the transformative review of employability a new Employer
Engagement team has been established to support employer
engagement across all programmes.
Green
Identify suitable Modern
Apprenticeship
opportunities within the
Council over next 2-5
years
Work with Resource workforce plans to identify numbers and
MA occupational areas, and build on MA frameworks to
create training which meets the needs of SLC.
The Council’s MA programme currently has the following Mas in post
•10 Business Administration – 2 year programme (awaiting
confirmation from Michelle Milne to recruit another 5)
•45 Trade – 4 year programme
•8 Road Operatives – 2 year programme
•23 Early Years – 2 year programme (9 full time Early Years
MA’s and 14 doing the level 3 MA for their own CPD)
•11 Social Care – 2 year programme (7 ‘new staff’ working
towards Level 2 before progressing onto Level 3, and 4 ‘existing staff’
working towards their Level 3 for SSSC registration purposes)
•2 IT Support – 2 years
•15 Digital Application Support – 1 year
•5 Housing Assistants – 2 year programme
Green
25

Page 26

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Workforce
High level action Detailed actions Comments/Progress Status
Engage with SDS to
agree MA priorities at
national and local level
Modern apprenticeship opportunities a standing item for
discussion at local employability partnership meetings.
SL Local Employability Partnership funding NHS Mas through No-one
left behind funding
Green
Work with Education
Resources to identify
suitable Foundation and
Modern Apprenticeship
journeys
Monitor progress of Foundation apprenticeship candidates
who are ready/suitable for Modern Apprenticeship
opportunities. Put in place any additional supports required.
All FA pupil’s are guaranteed an interview for MAs and the FA team
provide preparation for interview support including mock tests and
mock interviews
Green
Review the funding
streams available to the
Council to support
training including
Modern Apprenticeships
Examine the terms and conditions of these funding streams
to identify best option for funding or part-funding Modern
Apprenticeship programmes and other training opportunities
Processes to match Mas to budgeted vacancies are continuing across
all frameworks
Green
Put in place options for
trainee positions
including modern
apprenticeships using
workforce plans and
funding criteria to
maximise effectiveness
Use different funding streams to leverage best available
options for sustainable traineeships. Link to work with DYW.
No-one Left Behind funding has supported trainees in finance and
procurement in 23/24
Green
Land and property
High level action Detailed actions Comments/Progress Status
Increase the supply of Deliver the Strategic Local Programme Agreement (SLPA) Anticpated spend for SLC agreed as £16.908m Green
affordable housing
across South
Preparation and approval of the Strategic Housing
Investment Plan (SHIP).
SHIP in development. To be submitted to the H&TR committee on 11th
November 2023 for approval.
Green
Lanarkshire Implement policy on affordable housing in new private
developments in Local Development Plan 2
Delivery of affordable housing through the development process is
managed by application of policy in LDP2 and the accompanying
supporting planning guidance. A robust consultation process with
Housing Services ensures a bespoke solution is identified for
individual sites. In addition the Planning Service is part of the officer
working group identifying land for SHIP sites.
Green
26

Page 27

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Land and property
High level action Detailed actions Comments/Progress Status
Identify and purchase
appropriate properties to
meet specific housing
Promote and advertise scheme in targeted areas. Acquisition target increased to 120. Estates and Legal increased
resources to deliver. No advertising has been needed, as target likely
to be met.
Green
needs Target of 120 properties purchased through Market
Purchase Scheme for 2023/24.
55 properties have be acquired through the scheme by 30 September
2023
Green
Continuous assessment
of regeneration priorities
as part of Local Housing
Strategy process.
Considered as part of annual review of Local Housing
Strategy.
Housing led regeneration opportunities consider to be considered
across all areas of South Lanarkshire, with analysis of demand,
condition and proposed investment of existing council homes.
In addition, opportunities to regenerate East Kilbride and Hamilton
town centres are being progressed in conjunction with services from
across the council and its community planning partners, with Housing
and Technical Resources playing a key part in this development.
Green
Identified priority projects included as part of SHIP
development.
SLC projects identified - 15 High, 18 medium, 13 low priority; RSL 8
high, 11 med, 3 low
Green
Ensure priority projects are included as part of the
preparation of the next Local Development Plan 3
Preparation of LDP3 will involve extensive consultation with Council
services and partners to ensure projects that will deliver the aims and
objectives of the Council and Community Plans are identified and
included in the plan. A key part of the LDP process now includes the
preparation of a delivery programme to set out how the LDP will be
implemented and achieve key outcomes.
Green
27

Page 28

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Land and property
High level action Detailed actions Comments/Progress Status
Continue to target
long-term empty homes
to bring them back into
effective use and
contribute towards
meeting housing needs
with a target of 15 set
for 2023/24.
Establish a Matchmaker Scheme to link empty properties
with interested buyers.
Housing and Technical Resources have been working with other
council services and the Scottish Empty Homes Partnership to develop
a matchmaker scheme for South Lanarkshire. Liaison has taken place
with other councils to identify any good practice and issues to be
considered in the South Lanarkshire.  Due diligence and appropriate
legal services advice has been taken in relation to the data sharing
process for the scheme. Forms have been developed and advise has
been sought from legal services to ensure that these meet council
standards.  It is anticipated that the scheme will be launched in
December 2023.
Green
Set up an empty home grant scheme providing financial
support for owners to improve property condition.
Housing and Technical Resources have been working with other
council services and the Scottish Empty Homes Partnership to develop
a new grant Scheme that will aim to support owners of long term
empty properties in improving their property conditions and bringing
them back into use.  The development process to date has involved
reviewing existing schemes used elsewhere, and considering how this
could be used to best effect in South Lanarkshire. Moving forward
options for a scheme in South Lanarkshire are currently being
considered to identify a preferred option.   Due diligence and
appropriate legal services advice will be sought in relation to the data
sharing process.  It is anticipated that the scheme will be launched
spring 2024.
Green
Provide practical advice and assistance to empty property
owners.
Housing and Technical Resources give advice and information on a
range of issues to owners and neighbours in relation to long term
empty residential homes. On an ongoing basis there is tailored
training, workshops and facilitated best practice meetings ensuring
that knowledge, expertise and case studies are shared to help ensure
that the best advice is given to owners and neighbours. Reviewing and
further develop a communications programme and suite of
correspondence with owners take place regularly to make sure it is
relevant and up to date.
Green
28

Page 29

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Land and property
High level action Detailed actions Comments/Progress Status
Increasing number of
asset transfers
Support asset transfer through: Continued promotional work,
Continuation of CAT Officer Post to support community
interest, Grow Community Capacity
Supporting Community Asset Transfer continues to be of high interest
to local communities.  During Q2, we received 10 New Enquiries and
closed 2.  We continue to offer ongoing support to the 61
organisations interested in a CAT. With 3 new active applications being
opened in Q2 and continuing to work through 3 existing active
applications in the process.
Green
Annual evaluation of the
‘value’ of asset transfers
to communities and
CWB.
Co-design an evaluation tool with a 1-2 completed CAT
groups. Pilot and test. Develop the tool and CWB indicators.
Development of a tool has started but is in early stages by Q2. Green
Continue to improve the
energy efficiency of the
Council’s housing stock
contributing towards
national climate change
ambitions
The Housing Investment Programme will continue to
incorporate sustainable changes to the Council’s housing
stock, working towards increasing the number of properties
that meet the relevant energy efficiency standards for social
housing.
To be Reported at Q4 Year End. Report Later
Continue to implement
energy efficiency
measures across
council and partner
facilities including
Deliver a range of projects as part of the Community Energy
Efficiency Fund programme.
On Target.  Report was submitted to CMT on 21 September and the
programme of works was approved.  The addition of the budget to the
Capital Programme will be presented to the Executive Committee for
approval on 22 November.  Once approved, projects can then be
initiated.
Green
investment in renewable
energy solutions and
low/ zero-carbon heating
Reduce embodied carbon from construction (new builds and
refurbishment)
Design Process is constantly reviewing opportunities to reduce carbon. Green
29

Page 30

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Land and property
High level action Detailed actions Comments/Progress Status
Continue to maximise
external funding to
support owners and
private rented properties
improve their property
Work with partners, including Home Energy Scotland, to
provide advice and support to owners and private landlords
on funding opportunities available to them.
Housing and Technical Resources continue to work in partnership with
services from across the public and third sectors to support those
impacted by increased fuel costs.
This includes through hosting the twice annual South Lanarkshire
Private Landlord Forum, which has had between 40-50 South
Lanarkshire private landlords in attendance and inputs from Home
Energy Scotland.
Green
Implement and administer the Energy Company Obligation
(ECO) scheme within South Lanarkshire.
Housing and Technical Resources continue to develop the South
Lanarkshire ECO scheme, with the recruitment of a dedicated
administration officer for the scheme being finalised. The officer will
support both ECO installers and home owners to access national
OfGem administered funding, aiming to maximise the investment in
private homes across South Lanarkshire.
The ECO scheme has soft launched, with work commencing on
properties with approved installers . The number of projects is
anticipated to increase over the remainder of the year.
Green
Take the “20-minute
neighbourhood” concept
into account when
planning capital
schemes.
Include "20 minute neighbourhood” within the scoring criteria
when assessing bids for UK, Scottish Government and
Council funded capital schemes
Progress has been made in the masterplanning work ongoing around
town centres, where liveable neighbourhoods are at the heart of the
design process.
Green
30

Page 31

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Land and property
High level action Detailed actions Comments/Progress Status
Apply the principles of
Community Wealth
Building to spatial
planning decision
including the preparation
of Local Development
Plan 3 and the
assessment of planning
applications.
Ensure  LDP3 supports the principles of Local Living and
community wealth building:
Submission of Evidence Report (September 2024)
Prepare guidance to aid the assessment of planning
applications (December 2024)
A report setting out the role of the planning process in delivering CWB
objectives was reported to the Commission in September 2023.
Discussion has taken place with key officers to update on the data and
information required for the LDP3 evidence report in relation to CWB
and the social enterprise strategy and planning officers will participate
in relevant forums in order to develop engagement opportunities.
Some non-statutory supporting planning guidance will be created to
highlight the role of the development management ptrocess in
delivering CWB aspirations.
Green
Engage with public,
private and voluntary
sector partners to marry
-up aspirations and pool
funding to add value and
deliver one-stop service
provision
Ensure cross sector- partners are aware of planned projects
and opportunities for collaboration
Progress has been made in the masterplanning work ongoing around
town centres, where opportunities for hubs, which could include public
sector, third sector and small scale business incubation, is at the heart
of the design process
Green
31

Page 32

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Finance
High level action Detailed actions Comments/Progress Status
We will look to approach
the pension fund to
explore further
opportunities for
investment in local
areas. Other councils ,
with a similar interest,
may wish to make a joint
approach
Through officers initially, we will approach SPF to ask for
options to be considered for opportunities for local
investment. Considerations to be developed along side SPF
following initial discussions of possible areas.
In relation to investment by SPF we have had communication with
them around how they invest, in particular how they invest with
councils.
They have a Direct Impact Portfolio that they point to around a more
local impact investment portfolio This isn’t however a pot of funds that
can be “bid” for.
will continue to look at what other councils are doing in this area.
Complete
Establish working
relationships with CUs
and community partners
to promote savings and
affordable credit
Work with communities to grow Credit Unions by promoting
savings and affordable credit
We are improving awareness of credit union services in communities
and supporting growth by working across a range of internal and
external partners:
-Participation in the Work and Save Initiative (encouraging
more South Lanarkshire CUs to join the national initiative with
employers)
-Community visibility through On-line information pages as part
of our Money is not the only problem services directory.
-Facilitated a Citizens Advice Bureau /Credit Union joint
information session with the Improvement Service on 6th April to
expand partnership and collaboration ideas.
-Exploring improved links with our Education and Economic
development colleagues- an initial outcome was South Lanarkshire
Credit Union Network participation in Transform Business Festival in
February
Green
Building the generative economy
High level action Detailed actions Comments/Progress Status
Offer targeted support to
South Lanarkshire
businesses, enabling
Develop sector specific programmes (tourism, food and
drink, social enterprises, green economy, construction,
manufacturing etc)
Work on each sector continues, with each progressing in partnership
with representatives from the business community, Business Gateway,
and other agencies.
Green
them to create and
safeguard jobs, increase
turnover and profit
Signpost businesses to other sources of help and advice refer to note above Green
32

Page 33

IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System Report printed on Wednesday 22 November 2023
Community Wealth Building Action Plan
Building the generative economy
High level action Detailed actions Comments/Progress Status
Develop a
marketing/investment
strategy, including a
Create a site prospectus The revised approach around Inward Investment has been reported to
CMT in Nov 23 who have confirmed their support for the proposed
programme of work.
Green
promotional programme
with targeted/seasonal
events and promotions
Improve web presence/ on line material Procurement of a website and marketing strategy are underway. Green
around key employment
sectors.
Ensure planning and other statutory advice is up-to-date and
accessible
Close working relationships with planning continue to ensure officers
and businesses can access the best advice.
Green
Develop a new strategic
agreement with the
Third Sector
Establish a high level review group and comprehensive
engagement process for the review
This work will commence in Jan 2024. Report Later
Deliver the objectives
outlined in the social
enterprise strategy
2023-27
Deliver actions under the key priorities of Stimulating Social
Enterprise, Developing Stronger Organisations and Realising
Market Opportunity.
Social Enterprise Accelerator Tender awarded to Inspirent for delivery
of 2 programmes, to a cohort of 30 (total) social enterprise between
October 23 and March 24.
Currently under development - SE supply chain initiative pilot via local
community anchor organisation in Cam/Glen which will run alongside
the launch of the national community wellbeing exchange programme
Focus group session scheduled for 1 Nov with SEs on 'collaboration
and circular economy'
Climate Confident SL pilot underway with 20 SEs, 2 x workshops
completed in August and digital pathway being rolled out supporting
SEs on net zero journey
SE small grant awards made to the value of £20K supporting income
generation for enterprising organisations
Green
33

Page 34

34

Page 35

Report
Agenda Item 
Report to: Community Wealth Building Commission 
Date of Meeting: 12 December 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Wealth Building and Neighbourhood
Planning 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 propose to the Community Wealth Building Commission the provision of an
annual empowerment report on local wealth building indicators broken down by
locality
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) content of the report, be noted; and
(2) agree to the development of a locality-based set of Community Wealth
Building Indicators 
3. Background
3.1.  The Community Empowerment Act (Scotland) 2015 establishes the purpose of
Community Planning and places duties on Community Planning Partnerships (CPP)
to define several localities in which communities experience significantly poorer
outcomes than either the rest of the CPP area or Scotland as a whole and then
undertake locality planning for each of these.   
3.2. Locality Planning should enable CPPs and their partners to tackle inequalities for
communities facing disadvantage in particularly well targeted and effective ways. 
Each plan should show how CPP partners are deploying resources in support of the
agreed outcomes especially in ways which promote prevention, the reduction of
inequalities and the building of community capacity. 
3.3. It is easiest for community bodies to participate in community planning at locality or
neighbourhood level, where it can have most relevance to their lives and
circumstances. 
3.4. The South Lanarkshire CPP has defined the 4 localities to align with other locality
boundaries:- 
 Cambuslang and Rutherglen
 East Kilbride
 Hamilton
 Clydesdale 
5
35

Page 36

3.5.  Within these localities, the CPP has developed 9 Neighbourhood Plans in very local
neighbourhoods that are listed within the top 10% of deprivation on the Scottish
Index of Multiple Deprivation. 
3.6. Community Wealth Building aims to ensure the economic system builds wealth and
prosperity for everyone.1 and this aligns well to Neighbourhood Planning policy and
purpose.  Our Community Wealth Building Strategy is a ‘place-based approach to
economic development where anchor institutions, which are deeply rooted in their
localities, do all they can to ‘spend local’.2   
4. Developing a Picture of Local Wealth
4.1. Our Community Wealth Building Strategy recognises that bespoke approaches are
needed in localities reflecting the differences between them. Neighbourhood Plans
and locality planning more widely, aim to do the same. 
4.2.  It is suggested that compiling Community Wealth Building metrics by locality and
providing more detailed information broken down by neighbourhood planning areas
within localities would begin to provide insights for the Commission on where we are
directing anchor resources to build community wealth. 
4.3.  Therefore, annual locality-based indicator reports are proposed to be developed for
each of the 4 localities listed in 3.4.  Appendix 1 outlines what types of information
might be contained in such a report.  This information would be provided by locality
and where possible, would be broken down by neighbourhood planning areas within
each locality to demonstrate specific investment in areas with poorer outcomes. 
4.4. Over time, locality-based indictor profiles may assist us to establish Community
Wealth Building plans and targets that are bespoke to the needs of each of the 4
locality economies. 
4.5. Locality-based indicator profiles could also provide a rationale for Commission
members to prioritise investment and development work in areas of higher inequality
and deprivation and seek locality specific improvements. 
4.6.  If this information supported us to evaluate the impact of our investments, it would
also provide supporting evidence that partners are meeting both our Community
Planning duties under the Community Empowerment Act as well as our Fairer
Scotland duties. 
4.7. The list in Appendix 1 is an example of possible indicators we may wish to include
and is intended to demonstrate what may be developed across partners.  Further
work is required to engage more widely with partners, communities and services for
additional possible indicators to include and we may find some we would like to see
require development or are not possible.  We would create a short-term working
group to develop the data set. 
4.8. We expect there will be limitations on the availability of data on a place basis across
all member organisations.  A working group would provide members with an
opportunity to consider and create new data sets and comparison approaches to
better inform this new policy approach to economic development. 
1 What is Community Wealth Building? - Preston City Council; Economic Democracy, Accessed October 2023 
2https://www.southlanarkshire.gov.uk/download/downloads/id/14909/community_wealth_building_strategy_20
21.pdf  Access Nov 2023 
36

Page 37

4.9. It is proposed to provide an annual report to the Commission.  The first iteration of
the report would be available for the 2024/2025 reporting year. 
4.10. Thereafter, partners could consider if further work should progress to establish
evaluative processes for Community Wealth Building so we can report on the impact
of the data set proposed in Appendix 1 and its movements. 
5.  Policy Context
5.1. Considering Community Wealth Building from a place and inequalities perspective
aligns to other policy areas and requirements of Commission members:- 
 National Performance Framework 
 Fairer Scotland Duty 
 Place Based Investment and the Place Principles
 20 Minute Neighbourhoods
 Local Development Plan 4 (LDP4) and Place Plans
 Public Sector Reform and Whole Systems Leadership 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications 
7.1. There are no financial implications associated with this report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
9. Other Implications
9.1. There are no risk or sustainability issues associated with the content of this
report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. There are no Equality Impact Assessment or consultation implications associated
with this report.   
Paul Manning
Executive Director (Finance and Corporate Resources) 
24 November 2023 
Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
37

Page 38

 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jen Kerr, Community Engagement Manager
Email: Jennifer.Kerr1@southlanarkshire.gov.uk 
38

Page 39

APPENDIX 1 - Proposed Locality Based Community Wealth Building Indicators 
Building the Generative Economy- Develop and Grow small and locally owned enterprises.
1. Number of Social Enterprises and small to medium local businesses in each locality 
1.1. New starts
1.2. Closures 
1.3. Turnover of businesses and social enterprises 
2. Leadership- Protected Characteristics
3. Number of Employees
4. Number of cooperative or community share /owned businesses 
Finance – Increase flows of investment in local economies. 
1. Number Grants across sectors of enterprise; private, public and third sector
1.1. Value of grants by sector, grant provider 
1.2. Areas of investment – wellbeing, young people, civic participation 
2. Living Wage support – Number and value of grants provided
3. Participatory Budgeting Values by area 
3.1. Number of participants
3.2. Number of projects
3.3. Areas of Investment
3.4. % of Council budget made available to PB 
Land and Property – Deepen ownership of local assets for financial and social gain.
1. Number of Community Asset Transfers  
2. Value of Buildings in Community Management / Ownership
3. Turnover /Profit of Assets
4. Number of employees 
5. Volunteering -numbers of, hours of, value of
6. Social Return on investment figure
7. Community determined ‘value’ (to be developed) 
7.1. Social isolation reduced
7.2. Reduced antisocial behaviour 
7.3. Increased participation 
8. Vacant and Derelict Land brought into community use – Number of Hectares 
Spending- Public sector procurement and commission develop locally and keeps jobs.
1. Increase of local supply chain in procurement - % increase
2. Number and value of Community Benefits from Procurement 
3. Number and Value of Community Wish List exchanges 
Workforce- Fair employment practices and just labour market improves wellbeing.
1. Apprenticeships
2. School leaver destinations (DYW)
3. Training programmes
4. Living Wage Employers
5. Unemployment rates 
6. Universal Credit Claimants in work and out of work
7. In work poverty rates
8. Child poverty rates
9. Childcare spaces 
10. Family Employability support programmes – priority groups 
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 12 December 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Context for Community Wealth Building: Data Digest 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 present data on the social and economic situation in South Lanarkshire as a
context for Community Wealth Building 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) that the contents of the report, be noted
3. Background
3.1. To set the scene for the work of the Community Wealth Building Commission, a “data
digest” was compiled and presented to the first Commission on 31 August 2021.  The
digest covered a range of demographic, social and economic indicators and grew out
of a joint Community Planning Partnership session on tackling inequalities. 
3.2. The Commission agreed that it would be helpful for regular updates on key statistics
to be brought forward to assist debate and provide essential context for the work of
the Commission.  An updated data digest was presented to the Commission on 28
June 2022.   
3.3. The data digest has been refreshed for 2023 and is attached as Appendix 1 to this
report. 
3.4. The data digest covers a range of topics including:- 
 general population
 claimant unemployment and universal credit claimants
 child poverty
 welfare service statistics
 economic performance including Gross Value Added (GVA), business start-ups
and failures, and businesses per population
 health
 impact of Covid-19 on the labour market
 a range of public health indicators including road accident casualties, crime
statistics and hospital admissions data 
4. Employee Implications
4.1. There are no direct employee implications. 
6
41

Page 42

5. Financial Implications
5.1. There are no direct financial implications. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
7. Other Implications
7.1. None. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact assessment
is required. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
2 November 2023 
Link(s) to Council Objectives/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Community Wealth Building Commission – 31 August 2021
 Community Wealth Building Commission – 28 June 2022 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk
42

Page 43

Appendix 1 – data digest 
Community Wealth Building Commission 
Data Digest 
December 2023
43

Page 44

General Population - 2021 
Indicator North
Lanarkshire
% of Total
Population
South
Lanarkshire
% of Total
Population
Total Population 341,400 100.0% 322,630 100.0%
Male Population 165,329 48.4% 156,362 48.5%
Female Population 176,071 51.6% 166,268 51.5%
Adult Population 
(Aged 16 and over) 279,794 82.0% 266,930 82.7%
Working Age population
(Aged 16 to 64) 219,178 64.2% 202,430 62.9%
Population aged 65 and over 60,616 17.8% 64,500 20.0%
Source: NRS Mid-Year Estimates 2021 
Claimant Unemployment 
October 2021 October 2022 October 2023
Council Numbers Rate Numbers Rate Numbers Rate
North
Lanarkshire 10,295 4.7% 7,310 3.3% 7,145 3.3%
South
Lanarkshire 8,880 4.4% 6,120 3.0% 5,985 3.0%
Scotland 147,615 4.2% 106,930 3.1% 104,185 3.0%
Source: NOMIS (Sept 2023 provisional figures) 
People on Universal Credit 
October 2021 October 2022 October 2023
Council Numbers Rate Numbers Rate Numbers Rate
North
Lanarkshire 32,831 15.0% 34,051 15.5% 36,832 16.8%
South
Lanarkshire 27,901 13.8% 28,169 13.9% 30,092 14.9%
Scotland 456,544 13.1% 468,305 13.4% 501,457 14.3%
Source: DWP Stat-Xplore (Sept 2023 provisional figures) 
Child Poverty after housing costs - 2021/2022 
Council Numbers Rate
North Lanarkshire 18,252 26.6%
South Lanarkshire 14,292 22.8%
Scotland 245,890 24.5%
Source: The End Child Poverty Coalition  
44

Page 45

Scottish Welfare Fund – Quarter April to June 
Indicator North Lanarkshire South Lanarkshire
2021 2022 2023 2021 2022 2023
Number of
applications for
the Scottish
Welfare Fund
5,355 5,890 5,880 3,890 4,340 3,420
Number of
applications for
the Community
Care Grant
1,500 1,425 1,220 1,630 1,390 1,155
Number of
Community Care
Grants awarded
1,020 830 1,010 1,160 1,060 650
Number of
applications for
the Crisis Grant
3,855 4,465 4,660 3,855 4,465 4,660
Number of Crisis
Grant awarded 2,630 2,775 3,085 1,325 1,765 1,380
Source: Scottish Government Welfare Statistics 
Council Tax Reduction - August 
Indicator North Lanarkshire South Lanarkshire
2021 2022 2023 2021 2022 2023
Council Tax
Reduction
recipients
36,450 34,590 35,020 31,530 30,780 30,930
Council Tax
Reduction
weekly income
forgone (£000’s)
479.1 475.4 505.6 413.8 424.6 451.8
Source: Scottish Government Council Tax Reduction in Scotland 
Discretionary Housing Payments - March 
Indicator North Lanarkshire South Lanarkshire
2021 2022 2023 2021 2022 2023
Discretionary
Housing
Payments
awards
36,450 34,590 35,020 31,530 30,780 30,930
Discretionary
Housing
Payments value
479.1 475.4 505.6 413.8 424.6 451.8
Source: Scottish Government Welfare Statistics 
45

Page 46

Annual Welfare Services Statistics 
Indicator
North Lanarkshire South Lanarkshire
March
2021
March
2022
March
2023
March
2021
March
2022
March
2023
Number of
automatic
awards for free
school meals
12,149   5,049
families
5,335
families
5,343
families
Number of
clothing grants 13,406   13,021 12,906 12,672
Tenants in
receipt of
Universal Credit
9,796   7,915 8,679 9,465
Tenants on
Universal Credit
who were in
arrears
4,534   4,566 5,432 5,820
Source: South Lanarkshire Council 
Economic Performance 
Indicator North
Lanarkshire
South
Lanarkshire
Gross Value Added (GVA) - 2021 £8,074m £7,091m
Gross Value Added per hour worked – 2020 £37.50 £35.04
Business expenditure in R&D per head - 2020 £206 £87.07
Number of active businesses - 2021 8,630 9,600
Enterprise rate per 10,000 working-age population
- 2022 350.9 445.6
New business start-ups - 2021 1,170 1,170
Business start-ups birth rate per 10,000 16-64
population - 2021 53.4 57.8
% of Scottish business start-ups - 2021 6.19% 6.19%
Business failures – 2021 1,060 1,110
Business start-ups death rate per 10,000 16-64
population - 2021 48.4 54.8
% of all business failures in Scotland - 2021 5.38% 5.63%
Businesses surviving after three years in of those
established in 2018 and still in business in 2021 58.1% 59.0%
Growth sector enterprise rate per 10,000 working-
age population in 2022 56.1 85.0
Source: Office for National Statistics 
46

Page 47

Health 
Indicator North
Lanarkshire
South
Lanarkshire
Scotland
Adult Disability Payment - processed
applications authorised - to 31 July 2023 60% 60% 58%
Number of residents economically
inactive due to long-term sickness - year
to June 2023
23,000 12,400 248,900
Rate of residents economically inactive
due to long-term sickness - year to June
2023
38.6% 36.1% 31.9%
Healthy Life Expectancy for those born
in the 2019 to 2021 period for Females 56.7 years 62.7 years 61.1 years
Healthy Life Expectancy for those born
in the 2019 to 2021 period for Males 54.3 years 60.2 years 60.4 years
Source: Social Security Scotland; National Records of Scotland 
Selected Information from ScotPHO profiles at Council Area level 
More detail can be found on the Scottish Public Health Observatory website 
Indicator North
Lanarkshire
South
Lanarkshire  Scotland
Active travel to work - 2020 10.06% 10.34% 16.93%
Adults rating neighbourhood as a very
good place to live - 2020 42.3% 59.6% 59.1%
Alcohol-related hospital admissions per
100,000 population - 2021/2022 790.18 683.81 610.92
Annual participation (in education,
training or employment) measure for 16 -
19 year olds – 2022
90.20% 92.31% 92.35%
Asthma patient hospitalisations per
100,000 population - 2019/20 to
2021/22; 3-year aggregates
101.76 80.67 68.44
Babies exclusively breastfed at 6-8
weeks - 2019/20 to 2021/22; 3-year
aggregates
16.88% 22.31% 31.88%
Bowel screening uptake - 2019 to 2021;
3-year aggregates 60.50% 63.78% 65.56%
Breast screening uptake - 2010 to 2012;
3-year aggregates 68.26% 70.85% 72.48%
Cancer registrations per 100,000
population - 2018 to 2020; 3-year
aggregates
637.78 640.77 632.22
Child dental health in primary 1 -
2021/2022 School year 71.62% 76.49% 73.11%
Child dental health in primary 7 -
2019/2020 School year 75.02% 74.83% 74.96%
Child healthy weight in primary 1 -
2019/2020 73.61% 76.50% 76.25%
Children looked after by local authority -
2021 July snapshot - Crude rate per
1,000 children aged 0-17 years
10.51 12.03 12.93
Children referred to the Children's
Reporter for offences -2021/2022 -
Crude rate per 1,000 children aged 8-15
years
5.52 5.46 4.97
47

Page 48

Indicator North
Lanarkshire
South
Lanarkshire  Scotland
Chronic obstructive pulmonary disease
(COPD) patient hospitalisations per
100,000 population - 2019/20 to
2021/22; 3-year aggregates
322.78 243.94 207.45
Coronary heart disease (CHD) patient
hospitalisations per 100,000 population -
2019/20 to 2021/22; 3-year aggregates
388.83 361.43 341.63
Deaths all ages per 100,000 population -
2019 to 2021; 3-year aggregates 1382.12 1270.62 1180.65
Deaths from suicide per 100,000
population - 2017 to 2021; 5-year
aggregates
15.96 13.25 14.13
Deaths, aged 15-44 years per 100,000
population - 2019 to 2021; 3-year
aggregates
149.77 139.24 117.14
Domestic abuse - 2021/2022 - Crude
rate per 1,000 population 139.84 118.40 118.26
Drug crimes recorded - 2021/2022 -
Crude rate per 1,000 population 67.55 55.42 50.59
Drug-related deaths, males - per
100,000 population - 2017 to 2021; 5-
year aggregates
33.55 34.67 33.15
Drug-related deaths, females - per
100,000 population - 2017 to 2021; 5-
year aggregates
13.90 13.77 13.12
Drug-related hospital admissions - per
100,000 population – 2019/20 to
2021/22; 3-year aggregates
254.62 204.90 228.36
Early deaths from cancer, aged <75
years - per 100,000 population - 2019 to
2021; 3-year aggregates
168.87 153.69 149.58
Early deaths from coronary heart
disease (CHD), aged <75 years - per
100,000 population - 2019 to 2021; 3-
year aggregates
64.61 53.36 52.59
Emergency patient hospitalisations per
100,000 - 2019 to 2021; 3-year
aggregates
9327.28 8013.66 7236.08
Healthy birth weight - 2019/20 to
2021/22; 3-year aggregates 84.76% 84.60% 84.14%
Immunisation uptake at 24 months - 6 in
1 - 2020 to 2022; 3-year aggregates 97.00% 97.59% 96.98%
Immunisation uptake at 24 months –
MMR - 2020 to 2022; 3-year aggregates 95.15% 95.81% 94.39%
Life expectancy, females – 2020-2022 78.69 years 80.12 years 80.72 years
Life expectancy, males - 2020-2022 74.50 years 75.56 years 76.54 years
Multiple emergency hospital admissions,
aged >65 years - per 100,000 - 2019 to
2021; 3-year aggregates
6458.11 5592.38 5000.91
People aged 65+ with high levels of care
needs who are cared for at home -
2021/2022
46.30% 45.28% 35.31%
People claiming pension credits, aged
>60 years – 2016 May snapshot 8.35% 6.49% 5.49%
People living in 15% most 'access
deprived' areas - 2019 8.79% 13.36% 14.99%
Population income deprived – 2019 14.91% 12.70% 11.98%
48

Page 49

Indicator North
Lanarkshire
South
Lanarkshire  Scotland
Population prescribed drugs for
anxiety/depression/psychosis - 2021/22 22.35% 21.92% 20.14%
Population within 500 metres of a
derelict site – 2022 68.47% 18.80% 26.64%
Prisoner population per 100,000 – 31st
March 2014 snapshot 178.51 174.58 161.86
Psychiatric patient hospitalisations per
100,000 - 2019/20 to 2021/22; 3-year
aggregates
195.49 192.71 230.66
Road traffic accident casualties - per
100,000 - 2019 to 2021; 3-year
aggregates
43.12 46.06 54.70
School leavers in positive destinations -
2021/22 school year 94.16% 96.22% 95.73%
School leavers with 1 or more
qualification at SCQF Level 4 - 2021/22
school year
61.07% 64.62% 61.27%
School leavers with 1 or more
qualification at SCQF Level 6 – 2021/22
school year
45.25% 44.01% 44.09%
Single adult dwellings – 2022 40.21% 38.34% 38.45%
Smoking attributable deaths per 100,000
- 2020 to 2021; 2-year aggregates 327.95 280.38 270.02
Smoking during pregnancy - 2019/20 to
2021/22; 3-year aggregates 15.32% 11.35% 12.92%
Smoking prevalence, aged 16-34 years -
2019 survey year 19.2% 15.5% 18.6%
Teenage pregnancies - 2019 to 2021; 3-
year aggregates- Crude rate per 1,000
females aged 15-19
29.08 25.13 24.95
Violent crime – 2020/21 - Crude rate per
10,000 15.77 15.9 16.41
Working age adults with low or no
educational qualifications – 2019 16.20% 13.10% 11.64%
Working age population employment
deprived – 2019 11.3% 9.7% 9.3%
Source: Scottish Public Health Observatory 
49

Page 50

50

Page 51

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 12 December 2023
Report by: Executive Director (Community and Enterprise Resources)  
Subject: Food Procurement: Findings of the Market Capacity
Assessment and Next Steps 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Council’s Market Capacity Assessment on food
procurement and the next steps as described in the action plan
[1purpose]
2. Recommendations 
2.1. The Commission is asked to approve the following recommendation(s):-
[
(1) that the contents of the report, which was approved by the Climate Change and
Sustainability Committee on 20 September 2023, be noted 
3. Background
3.1. South Lanarkshire Council (SLC) aims to provide suppliers with opportunities to
increase the provision of local food and drink as set out in the Good Food Strategy,
Procurement Strategy and Community Wealth Building (CWB) Strategy.  Local
procurement is one of the key stands of the Council’s CWB Strategy and this
exercise aimed to identify opportunities for increasing local spend. 
3.2. A Project Review Group on Sustainable Food Procurement was established in
February 2021 to identify options to progress this objective.  In particular, the
decision was taken to source funding to undertake research into the food and drink
market in South Lanarkshire with a view to identifying actions to increase local spend
and overcome potential barriers. 
3.3.  An application was made in October 2021 to the Council’s Food Strategy Fund for
£10,000 to recruit a consultant to undertake a Market Capacity Assessment and
understand the capacity of local food and drink businesses to supply food to the
different buyers of the Council. 
3.4. The application was successful and following a Quick Quote procedure, the contract
was awarded to Fare Consulting Limited for a budget of £14,500 (additional funding
also came from the Food Strategy Fund).  Fare Consulting Limited is an independent
consultancy established 8 years ago with experience in projects with multiple
stakeholders and businesses of varying scale and complexity and in food and drink
related projects. 
3.5. There is national interest at the moment with regards to sourcing local food with the
Good Food Nation Act (2022). 
7
51

Page 52

4.  Objectives of the Market Capacity Assessment 
4.1. The objectives of the research were as follows:- 
 assess capacity of local food and drink businesses to supply to SLC Resources
 identify local food and drink businesses who can currently meet the Council
demand
 identify food and drink businesses who could develop to meet demand
 identify challenges to local businesses to begin to supply and to the Council in
purchasing; and
 recommend actions for the Council and partners to address and overcome
barriers 
5.  Activities Undertaken to Deliver the Project
The consultant undertook the following activities:- 
 internal engagement with the Council including bilateral and group meetings
with officers from Facilities, Social Work, Economic Development, Performance
and Development Teams and South Lanarkshire Leisure and Culture (SLLC)
and data collection on food requirements and provision per department
 external engagement with local food and drink businesses across Lanarkshire
via a variety of methods (online meetings, online survey, drop-in sessions,
direct contact via emails and calls)
 external engagement with industry bodies (ie, Scotland Excel, Scotland Food
and Drink, Lanarkshire Larder, Soil Association, SAC Consulting and National
Farmers Unions)
 external engagement with other local authority representatives
 analysis of documentation received (Council and SLLC food and drink
purchasing details, country of origin purchasing data, agricultural census)
 analysis of research (data, questionnaire, feedback from meetings and
discussions) 
6.  Summary of Fare Consulting Limited Findings and Additional Data Provided
by Scotland Excel
6.1. Overview of Council Buyers
 Facilities Services is the largest purchaser of food and drink.  It represents 86%
of the value of food purchased by the Council (including all Resources and
SLLC).  The Service supplies food to 93 nurseries, 125 primary schools, 7
Additional Support Need schools and 17 high schools, staff restaurant and
community meals.  The Service has a legislative duty to provide school meals
which comply with the nutritional requirements of National Requirements for
Food and Drink in School (Scotland) Regulations 2020, for Nurseries the
standard for meals is "setting the Table".  In addition to these legislative
requirements, the Service provides over 500 adapted diets for medical and
cultural needs for pupils.  The Service must comply with Food Safety Act 1990
and ensure that all suppliers are vetted and have the accreditations and safety
standards in place.  Scotland Excel uses the Environmental Health Service to
ensure that food and drink contracts meet the relevant safety standards and
can provide full traceability of food
 Social Work Resources is the second largest purchaser (9% of the total value of
food purchased) with food provision to care homes and day care
 SLLC purchases food and drink for visitor cafés and for events at SLLC venues
(4% of the total value of food purchased)
 other Resources (Housing and Technical, Finance and Corporate, and
Education) have limited spend with ad hoc requirements
52

Page 53

6.2. Overview of Food Purchased
 the Council is procuring all food and drink via Scotland Excel Framework
Contracts, with the exception of fresh fruit and vegetables sourced directly from
George Carruthers
 Scotland Excel is the Scottish local authority Centre of Expertise who is
responsible for establishing collaborative frameworks for use of all councils to
drive efficiency and best value.  The Council’s strategic sourcing approach for
food and drink requirements is focused on use of Scotland Excel frameworks
which ensure compliance with health and safety and food quality standards
 the Council has a collaborative contract with North Lanarkshire for fruit and
vegetables and has maintained this contract as the terms are more favourable
than the Scotland Excel framework
 total food and drink purchased via Scotland Excel frameworks for the Council is
in the region of £4.5m per year
 current suppliers, value of contract and information about country of origin for
food purchased by the Council are presented below
 all figures are extracted or calculated from tables provided by Scotland Excel for
the period April 2021 to March 2022 or from tables provided by Procurement
Services.  A visual representation is available in Appendix 1 
Contract Supplier Total
Spent
Total
Scottish
Spend*
Sub-suppliers from
Lanarkshire available in
suppliers’ catalogue 
Frozen
Food
Brakes £3,291,728
(73%) 
20% Cosmo’s pizza and pizzini 
Groceries
and
Provision
Brakes 12% Lees and Tunnocks cakes and
confectionery, Border Biscuits,
Equi Ice Cream and AG Barr
drinks
Brakes also employs over 400
people in Newhouse, Motherwell
Depot. 
Fresh Fruit
and Veg
George
Carruthers
£517,874
(11%)
16% Fruits and vegetables are
sourced from the Glasgow fruit
market.
Milk Muller £416,058
(9%)
100% 23% of supplying farms are within
Lanarkshire and 20% adjacent
(Dumfries and Galloway)
Significant company
infrastructure and employee
numbers in Bellshill, East Kilbride
and Cambuslang
Fresh Meat,
Cooked
Meat and
Fish
Campbells
Prime Meat
£164,101
(4%)
99% Some meat procured from farms
in Lanarkshire, including
Heatheryhall Farm, Toftcombs
Farm and Park Farm
Davidsons
Cash and
Carry 
Soft drinks and
confectionaries
-  essentially
for SLLC)
£143,740
(3%)
13% Information not available 
* To be classified as Scottish, products should either come from Scotland or be manufactured in
Scotland. To be classified as coming from Scotland, one of the following must apply: it is grown on a
Scottish farm or it is derived from fishing activities in the North-East Atlantic (which includes the North
Sea and Scottish coastal waters) and landed at a Scottish seaport in rivers, lochs or water courses
and fish farms within Scotland. Food classified as manufactured in Scotland is manufactured from raw
ingredients (even though they may not originate from Scotland) in a Scottish factory or food facility
which employs people and contributes positively to the country’s gross domestic product.
53

Page 54

 with regards to the origin of meat (frozen, fresh and cooked either from
Campbell Meat and Brakes), 53% is from Scotland*, 44% was from the rest of
the UK, 1% from Europe and 2% was out with Europe
 regarding fish (exclusively from the Frozen Food contract with Brakes), 47% is
from Scotland*, 1% was from the rest of the UK and 52% was from a country of
origin out with Europe 
6.3. Overview of the Local Food and Drink Market and Engagement with Businesses
including Current Suppliers
 there are 615 businesses registered as Food and Drink businesses in South
Lanarkshire and 166 in North Lanarkshire (Growth Sector Statistics, Scottish
Government, consulted in 2022).  The sector includes the following: Crop and
Animal Production; Hunting and Related Service Activities; Fishing and
Aquaculture; Manufacture of Food Products and Manufacture of Beverages
 following engagement with businesses, 22 businesses showing interest in
supplying food to the Council were identified (overview of businesses available
in Appendix 2)
 the Lanarkshire location has a reputation for high quality dairy produce and
meat
 in addition to farmers and traditional food and drink businesses, there is a
thriving artisan food scene in South Lanarkshire with makers of craft drinks,
coffee blenders, artisan bakers and specialist meat and cheese producers
 there are limited examples of active collective working in the food and drink
private sector.  Lanarkshire Larder is a network of food and drink businesses
with under 30 producer members but it is first and foremost, a marketing
organisation
 88% of the agricultural land in the Council area is grassland or land used for
rough grazing, 6% is woodland, 5% is used to grow crops (of which 76% is
used for grains) and 1% is classified as other land
 Brakes is currently working with 78 Scottish suppliers including 8 from
Lanarkshire and offers local food products within a large buying range
 Muller sells milk from 198 Scottish farms including 11 farms from Lanarkshire to
all Scottish customers.  The business has significant infrastructure and
employee numbers in Bellshill, East Kilbride and Cambuslang 
6.4. Overview of Practices Developed by Other Local Authorities in Scotland
 practices described below, ie, from East Ayrshire Council and Argyll and Bute
Council, were selected and analysed by the consultant as they are perceived as
part of the most advanced in Scotland regarding local food procurement.
However, it should be noted that the requirements in terms of volume for the
respective catering teams are very distinct given the number of pupils in each
local authorities with 45,862 pupils in South Lanarkshire, 16,149 in East
Ayrshire Council and 9,994 in Argyll and Bute (figures for 2022)
 in East Ayrshire Council, the process of sourcing local food started 8 years ago.
Menus and recipes are developed according to seasonality and availability of
supply. Contracts are offered for smaller lots, ie, specific products or specific
geographical areas, which allow smaller businesses to tender. Tendering
processes are also tailored with criteria related to CWB and sustainability. This
approach requires additional human resources in the Procurement and Catering
Team and continuous engagement and support to several businesses
compared to handling one single contract. There is also a central distribution
point. Cost of local food is higher but this is offset by the hospitality and events
business. Buying independently also offers flexibility to buy what is affordable
whereas there is less flexibility in Scotland Excel frameworks
54

Page 55

 in Argyll and Bute Council, the process started 12 years ago and the primary
objective is to support local communities. The Council uses the Excel
Framework but has clauses in place to permit flexibility in use of contracts. A
pilot exercise was initially established on the Isle of Bute with local meat, milk
and eggs supplied into island schools, then the model was replicated
elsewhere. Small procurements lots were defined on a local basis. Business
Gateway and the Supplier Development Programme (SDP) targeted
businesses wishing to engage with the Council. Cost of local food is higher and
it also takes more resources and time to deal with multiple small suppliers
compared to handling one contract 
6.5. Key Findings
 supplier engagement was challenging and the level of interaction with local food
and drink businesses was not as high as anticipated with only 22 businesses
responding (more information on businesses available in Appendix 2). The low
level of responses could be explained by the context with businesses under
pressure and limited capacities to engage with third parties and/or a low interest
in supplying food to the Council
 all 22 businesses identified indicated a desire to engage further with the Council
on local procurement
 however, further engagement with businesses would be required for a better
understanding of their ability to supply food to the Council as the following
constraints were identified:- 
i. many of the products sold by local businesses do not match the demand
from Facilities, eg, 5 businesses of alcohol and 3 of soft drinks businesses
were identified but could match the demand of other buyers such as SLLC
(Appendix 2 - Figure 2)
ii. none of the businesses can fulfil the scale of current requirements for
schools. Although some of the businesses could supply an element of the
requirement, ie, some products or some geographical areas, these are
mostly small businesses with turnover below £250k per annum. For
instance, of the 22, two businesses were interested in supplying poultry, two
businesses were interested in supplying milk to some areas/schools, one
business could also supply gluten free bakery goods
iii. accreditations held by businesses are very variable depending on
businesses (Appendix 2 - Figure 5) and might not match the requirements of
the Council buyers 
 the analysis of practices implemented in local authorities which are further
ahead in their journey does not give a fully relevant assessment of opportunities
given the different scale on which they operate
 as shown in the table in Section 6.2 (last column), some of the food currently
purchased by the Council comes from local suppliers as they supply Tier 1
contractors Muller, Brakes and Campbell Meat
 there is a national interest towards local food in the public sector. Scotland
Excel and current Council suppliers are following strategies to expand local
procurement by trying to increase the number of local sub-suppliers 
6.6. Challenges and Opportunities
 if suitable local products/businesses were identified (eg, milk), the strategy of
splitting lots during the tendering process could potentially be adopted to
overcome the issue of local businesses being able to only supply smaller
quantities compared to the Council requirements, following the approach of
East Ayrshire and Argyll and Bute Councils. 
55

Page 56

By doing that, businesses would be required to supply only one element of the
requirements, ie, a product or an area. This approach is likely to imply more
resources from Procurement Services to tender and manage contracts, more
resources from Facilities Services to manage multiple contracts and from
Environmental Services if vetting and traceability processes had to be
undertaken
 the Council cannot award local providers without a competitive process but
tendering processes can be tailored with specific criteria that could give higher
score to local businesses (eg, CWB and sustainability criteria)
 to meet the Council demand in terms of volume, opportunities of collaboration
among businesses could also be explored
 to overcome the issues of accreditations, business support provided by the
Council and partners could be targeted to specific businesses, (eg, Business
Grants and Business Gateway)
 cost of local food might be higher as seen in other local authorities engaged in
local food procurement
 challenges perceived among suppliers also include the lack of capacity of
businesses to engage with the public sector. However, support is available
thought the Supplier Development Programme who supports businesses in
engaging with public sector procurement
 in the short term, there are more opportunities to make progress with regards to
local procurement for SLLC venues compared to other Council Resources. This
is due to the type and scale of produce sold within these venues. For instance,
among the companies who have expressed interest, five produce alcohol, two
produce coffee and one produces tea
 as illustrated in the table Section 6.2, subcontract opportunities are significant
with the possibility for local small-scale providers to supply food to the largest
suppliers (eg, Brakes, Muller or Campbell Meat) 
7.  Evaluation of the Market Capacity Assessment 
7.1.  The outputs of the Market Capacity Assessment are evaluated in the light of the
objectives (as listed in Section 4). 
Objectives Evaluation
Assess capacity of local food and drink
businesses to supply to SLC Resources
The assessment is partial as only 22
food and drink businesses responded to
the survey despite the variety of
methods used to engage with them
Identify local food and drink businesses
who can currently meet the Council
demand
All businesses identified wanted to
engage with the Council but would face
constraints to supply food to the council.
Further engagement with businesses
would be required to get a more in-
depth understanding of opportunities
Identify food and drink businesses who
could develop to meet demand
While assessment of current interest
and capacity has been undertaken, no
assessment of required development to
meet the Council’s demand has been
undertaken
Identify challenges to local businesses
to begin to supply and to the Council in
purchasing
Barriers were identified
Recommend actions for the Council and
partners to address and overcome
barriers
Recommendations were made and
discussed with Council services
56

Page 57

8. Next Steps and Monitoring 
8.1.  Recommendations were discussed with the consultant and Council Services and
Resources. Actions agreed and an update on implementation is provided below. 
Action  Expected Outcomes Update / Timeframe
Engagement with Businesses 
Pursue
engagement with
the 22
businesses
identified. 
Service:
Economic
Development 
For each business,
detailed analysis of
business capacity
compared to Council
demand and
identification of actions
that would be required to
source products from
these businesses
Engagement with businesses will be
carried out in 2023/2024
Explore the
possibility of
using the Quick
Quote process to
increase the
supply of local
food and drink in
specific SLLC
venues. 
Service: SLLC
and Procurement 
Increased supply of local
food and drink in specific
SLLC venues 
Two sites, ie, Rutherglen Town Hall and
Chatelherault Country Park started an
audit process of the current demand (type
of product, volume used and current
suppliers) and local offer (potential local
suppliers).
The audit in Rutherglen Town Hall is
complete and shows that the current offer
of food is suitable, but the venue will
review the menu and products
periodically. 
The audit in Chatelherault Country Park is
still ongoing. A working group including
officers from SLLC procurement was
established. It will bring recommendations
together including a list of products (e.g.
meat and fruit and veg) that is expected
to be sourced through Quick Quote
processes. The process is expected to
start in December 2023.
Delays are being experienced in the
development of this project due to
restructure of SLLC. 
Identification of Additional Good Practices 
Identify and
analyse practices
developed in
comparable local
authorities
including cost
implications.
Service:
Sustainable
Development and
Facilities
List of good practices
from comparable local
authorities that could
replicated in South
Lanarkshire 
Engagement with additional local
authorities will be carried out in
2023/2024
Business Support
Deliver the food
and drink
accelerator
programme “Eat
South
Lanarkshire.”
Service:
Economic
Development
Tailored support to
selected food and drink
businesses 
The programme will take place in
2023/2024. Eight businesses from South
Lanarkshire will be selected to participate
to the accelerator programme. The
programme will be advertised to
companies who have shown interest in
supplying food to the Council buyers. 
Cost: £31,440 for 2023/2024
57

Page 58

Action  Expected Outcomes Update / Timeframe
Support
discussion with
the existing
collaborative food
and drink group
Lanarkshire
Larder
Service:
Economic
Development
Effective food and drink
businesses local network
to increase possibilities
of collaboration among
businesses
The Council continues to financially
support Lanarkshire Larder and provide
expertise. South Lanarkshire Council has
a now a seat at the board of Lanarkshire
Larder and outcomes were agreed
together with the organisation.
Cost: £5,000 for 2023/2024 
Promote sub-
contracting
opportunities to
local businesses
together with
partners (e.g.
Supplier
Development
Programme,
Scotland Food
and Drink,
Lanarkshire
Larder)
Service:
Economic
Development
Increasing number of
local food and drink
businesses aware of
sub-contracting
opportunities 
Two local events took place in 2022/2023
for local businesses to meet buyers:
1/ Lanarkshire Meet the “Real” Buyer
event organised in February 2023 and
jointly hosted by North Lanarkshire and
South Lanarkshire Council and supported
by the Supplier Development Programme
(SDP). However, no local food and drink
businesses participated to the event
despite communication on the event. 
2/ “Showcasing the Larder of the
Lowlands” organised with support from
Scotland Food and Drink in April 2023
with 50 food and drink businesses who
attended the event. 
By March 2024, a supplier development
event will be organised by Lanarkshire
Larder for local food and drink businesses
with support from the Council. 
8.2. An update on the implementation of this action plan will be provided twice a year as
part of the quarter 2 and quarter 4 reports of the food action plan presented to the
Climate Change and Sustainability Committee. 
9. Employee Implications
9.1. Key services (ie, Economic Development, Procurement and SLLC) are required to
contribute to the implementation of actions. The Policy Officer for Food Development
will monitor progress. 
10. Financial Implications
10.1. There are no direct financial implications as a result of the recommendations in the
report. 
10.2. Financial implications of local procurement options will be confirmed as part of the
delivery of the action plan. 
11. Climate Change, Sustainability and Environmental Implications
11.1. Providing suppliers with opportunities to increase the provision of local food and
drink will help the transition towards a more sustainable and resilient food system
and therefore, help to achieve the objectives of the Climate Change and
Sustainability Strategy by supporting local food production and local food system,
ensuring that food come from places subject to high environmental standards,
reducing food miles, increasing connections between residents and local
businesses. 
58

Page 59

12. Other Implications 
12.1. The main risk identified is the possibility for the Council to have difficulty in
progressing its objectives of increasing the provision of local food (CWB Strategy
and Good Food Strategy). 
13. Equality Impact Assessment and Consultation Arrangements
13.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required.  An Equality Impact Assessment has been conducted and
approved for the Good Food Strategy 2020 to 2025. 
13.2. There were no consultation arrangements required for this report. 
David Booth 
Executive Director (Community and Enterprise Resources) 
22 November 2023 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Fair, open and sustainable
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 Climate Change and Sustainability Committee 31 August 2022 – Action Plan for the
third year of implementation of the Good Food Strategy 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Hélène Gourichon (Policy Officer for Food Development)
Email: helene.gourichon@southlanarkshire.gov.uk 
59

Page 60

Appendix 1. Food spending per category and per contract (value) 
73%
4%
9%
11%
3%
Brakes (general/frozen goods) Campbells Prime Meats (raw and cooked meats)
Muller (milk and cream) Carruthers (fruit and vegetables)
Davidsons Cash and Carry
60

Page 61

Appendix 2. Overview of food and drink businesses showing interest in supplying
food and drink to the Council
1 Type of business 
2 Categories of food and drink that businesses make/sell 
61

Page 62

3 Size of Businesses 
4 Department that Businesses would be Interested to Supply 
62

Page 63

5 Accreditations held by Businesses 
Other include: BRC AA+, SEDEX, Living Wage, Vegan Society, Speciality Coffee
Association, Rainforest Alliance, RSPO Palm Oil, FDA
63

Page 64

64

Page 65

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 12 December 2023
Report by: Executive Director (Finance and Corporate Resources) 
Subject: Forward Programme for Future Meetings 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the forward programme for the meetings of the Community
Wealth Building Commission
 invite members to suggest topics for inclusion in the Committee’s forward
programme
[1purpose]
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):-
[recs]
(1) that the report and the outline forward programme for the meetings of the
Commission, attached as an appendix to the report, be noted.
[1recs]
3. Background
3.1. Members of the Commission have expressed an interest in bringing forward items to
future meetings which would explore each of the 5 pillars in detail and allow
constructive discussion on how collectively to progress the CWB agenda in South
Lanarkshire. 
3.2. In a similar vein, it has been noted at previous meetings that the updates on the
action plan at Q2 and Q4 provide only an overview of progress, with brief summaries
of the actions that are being taken.  For a detailed understanding of the context,
progress and challenges under each pillar, it is necessary to look at specific topics in
detail. 
3.3. To assist in shaping the future deliberations of the Commission, an outline forward
programme is attached as an appendix to the report.  Members are invited to
consider the programme and suggest topics that they would like to see addressed at
future meetings.  
4. Employee Implications
4.1. There are no employee implications. 
5. Financial Implications
5.1. There are no financial implications. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no climate change, sustainability or environmental implications in terms of
the information contained within this report. 
8
65

Page 66

7. Other Implications 
7.1. There are no risk implications in terms of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. The report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
23 November 2023 
Link(s) to Council Values/Objectives/Ambitions
 Accountable, effective, efficient and transparent 
Previous References
None 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
66

Page 67

APPENDIX – CWB COMMISSION OUTLINE FORWARD PROGRAMME 
Meeting Date Item Responsibility
12 March 2024  Community Benefit – Housing Supply Programme
(tbc)
 Forward Programme for Future Meetings
 Meeting Timetable 2024/2025
Jonathan 
Tom/Helen
Tom/Helen   
11 June 2024  Forward Programme for Future Meetings  Tom/Helen 
10 September 2024  Forward Programme for Future Meetings  Tom/Helen 
3 December 2024  Forward Programme for Future Meetings  Tom/Helen 
Future Meetings  Employability and the Employment Pillar
 Asset Transfer
 Planning for Place and CWB
 Community Benefits within Contracts
 UN Sustainable Development Goals 
SLC
SLC
SLC
SLC
VASLan or 
Cmty Planning 
67

Page 68

68