Agenda Document Pack - Community Wealth Building Commission - 05/09/2023

South Lanarkshire Council · 5 September 2023
Back to Community Wealth Building Commission — 5 September 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 28 August 2023 
Dear Member 
Community Wealth Building Commission 
The Members listed below are requested to attend a meeting of the above Board to be held
as follows:- 
Date:  Tuesday, 05 September 2023
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
South Lanarkshire Council
Councillor Alex Allison
Councillor Robert Brown
Councillor Maureen Chalmers
Councillor Margaret Cooper
Councillor Joe Fagan (Chair)
Councillor Kirsten Robb
Councillor John Ross
Councillor Margaret B Walker
Cleland Sneddon, Chief Executive
Paul Manning, Executive Director (Finance and Corporate Resources)
Soumen Sengupta, Director, Health and Social Care 
Jann Gardner, Chief Executive, NHS Lanarkshire
Josephine Pravinkumar, Director of Public Health, NHS Lanarkshire
Hisashi Kuboyama, Development Manager, West of Scotland, Federation of Small
Businesses
Steven Sweeney, Chief Executive, VASLan
Thomas Adamson, Estates Environment Manager, University of the West of Scotland
(UWS) 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community Wealth Building Commission
held on 6 June 2023 submitted for approval as a correct record. (Copy
attached) 
3 - 8 
Item(s) for Consideration 
3 Community Wealth Building Action Plan 2023 Refresh
Report dated 17 August 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
9 - 22 
4 Community Wealth Building Annual Report 2022-2023
Report dated 17 August 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
23 - 46 
5 Spatial Planning and Community Wealth Building
Report dated 28 July 2023 by the Executive Director (Community and
Enterprise Resources). (Copy attached) 
47 - 52 
6 Town Centres Strategic Update
Report dated 27 July 2023 by the Executive Director (Community and
Enterprise Resources). (Copy attached) 
53 - 58 
7 Draft Community Wealth Building Charter
Report dated 28 July 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
59 - 64 
8 Third Sector and Community Wealth Building
Report dated 17 August 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
65 - 70 
9 Forward Programme for Future Meetings
Report dated 16 August 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
71 - 74 
Any Other Competent Business 
10  Any Other Competent Business
Any other items of business which the Chair decides are competent. 
For further information, please contact:-
Clerk Name: Helen Calley
Clerk Telephone: 07385370069
Clerk Email: helen.calley@southlanarkshire.gov.uk 
2

Page 3

COMMUNITY WEALTH BUILDING COMMISSION 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 6 June 2023 
Chair:
Councillor Joe Fagan 
Present:
South Lanarkshire Council
Councillors Robert Brown, Maureen Chalmers, Kirsten Robb, Margaret B Walker
C Sneddon, Chief Executive; P Manning, Executive Director (Finance and Corporate Resources)
NHS Lanarkshire
J Pravinkumar, Director of Public Health
University of the West of Scotland
T Adamson, Estates Environmental Manager 
Also Attending:
South Lanarkshire Council
Community and Enterprise Resources
Y McBride, Economic Development Officer; I Ross, Project Manager
Finance and Corporate Resources
H Calley, Administration Officer; C Fergusson, Head of Finance (Transactions); J Kerr, Community
Engagement Manager; N Reid, Improvement and Community Planning Manager; L Wyllie,
Administration Assistant
Housing and Technical Resources
J Read, Strategy and Policy Adviser
Local Government Improvement Service
R Hart, Project Lead, Rutherglen 
Apologies:
South Lanarkshire Council
Councillors Alex Allison, Margaret Cooper, John Ross; S Sengupta, Director, Health and Social
Care; G McCann, Head of Administration and Legal Services (Finance and Corporate Resources)
Federation of Small Businesses
H Kuboyama, Development Manager, West of Scotland
NHS Lanarkshire
J Gardner, Chief Executive
VASLan
S Sweeney, Chief Executive Officer 
1 Declaration of Interests
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Community Wealth Building Commission held on 28 February
2023 were submitted for approval as a correct record. 
The Commission decided: that the minutes be approved as a correct record.
2
3

Page 4

3 Shaping Places for Wellbeing
A report dated 10 May 2023 by the Executive Director (Finance and Corporate Resources) was
submitted introducing the Local Government Improvement Service’s (LGIS) Shaping Places for
Wellbeing Programme. 
Shaping Places for Wellbeing was a 3 year programme, running until March 2024, delivered by
Public Health Scotland (PHS) and LGIS, with local authorities and NHS Boards.  It aimed to
address health inequalities and attempted to stop problems developing through the use of an
upstream approach to address the social determinants of health. 
The Programme recognised that the ability to make improvements sat with local partners,
including councils and it sought to harness this to develop new approaches that improved health
and wellbeing outcomes and from which learning could be drawn and used more widely across
Scotland. 
In South Lanarkshire, Rutherglen had been selected as a test site due to its level of health
inequalities, its strong local infrastructure and the work being complementary and supplementing
the range of activity already underway.  The report detailed links to the CWB agenda. 
R Hart, Project Lead, Rutherglen, gave a presentation which highlighted the following:- 
 Shaping Places for Wellbeing was achieved through 3 activities; local project work, local
learning cohort and national leadership cohort
 the national context, including key policies and approaches
 the ‘Big Picture’ was “how to keep focus on long term system change when there was so
much firefighting in the context of acute need and low resource?”
 the state of health and health inequalities in Scotland
 delivering a future for Scottish local authorities through 6 core anchors that underpinned
the role of the local government sector of the future
 the Place and Wellbeing Collaborative
 implementation of the Shaping Places for Wellbeing Programme 
 next steps and additional resources 
The Project Lead, Rutherglen, responded to members’ questions on:- 
 the assessment sessions and their expected outcomes
 supports provided to achieve objectives in local and neighbourhood plans
 the new Planning regulations and ensuring spatial requirements were included
 understanding of areas of health inequalities
 how emerging themes from the data profiling had impacted the Programme 
The Commission decided: that the report and presentation be noted. 
J Pravinkumar joined the meeting during this item of business 
4 South Lanarkshire Social Enterprise Strategy 2023 to 2027
A report dated 27 April 2023 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on the progress of the development of the South Lanarkshire
Social Enterprise (SE) Strategy. 
At the first meeting of the Community Wealth Building (CWB) Commission on 31 August 2021,
members approved an action plan to accompany the South Lanarkshire CWB Strategy 2022.
This new Social Enterprise (SE) Strategy was one of the high-level outcomes of the CWB Action
plan, alongside the development of an SE Steering Group.
4

Page 5

The SE Strategy set out the Council’s commitment to increase the number of social enterprises
and improve the sustainability of the sector in South Lanarkshire.  Constructive comments had
been received which had informed the SE Strategy, attached as Appendix 1 to the report. 
The priorities and draft narrative were shared with and informed by, partners and stakeholders,
within and outwith the Council, as part of a wider consultation process.  A list of consultees was
attached as Appendix 2 to the report. 
The SE Strategy was a new strategy for South Lanarkshire and was in keeping with the Scottish
Government’s priorities for the sector and vision of a fair society and inclusive economy, as set
out in the ‘Scotland’s Social Enterprise Strategy 2016 to 2026’.  The 3 high level priorities were:- 
 stimulating Social Enterprise
 developing stronger organisations
 realising market opportunity 
The Strategy’s vision was “to cultivate a vibrant and growing social enterprise sector in South
Lanarkshire, which creates social and environmental benefits for all”.  A summary of the
sections of the Strategy was provided in the report. 
The Economic Development Officer responded to a member’s question on the Community Bond
model. 
The Commission decided: that the content of the South Lanarkshire Social Enterprise
Strategy 2023 to 2027 be noted. 
[Reference: Note of 31 August 2021 (Paragraph 4)] 
5 Supplier Engagement
A report dated 18 May 2023 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on the engagement activities that had been undertaken to
assist local businesses to access South Lanarkshire Council tender opportunities which included
the South Lanarkshire Council Supplier Engagement Survey that was cascaded to the local
business base during September 2022. 
A key objective of the Community Wealth Building (CWB) Strategy was to increase the levels of
spend by the Council and anchor institutions within the South Lanarkshire area.  An action plan
supported the Spend Pillar of the Strategy and included reviewing the processes for how the
Council procured, engaged and supported businesses and identified and promoted increased
tender opportunities. 
The CWB ’Spend Pillar’ Group had agreed that ascertaining the skills, experience and thoughts
of the local business base would help to tailor how to support those businesses going forward in
relation to increasing the number of local Small Medium Enterprises (SMEs) securing contracts
with South Lanarkshire Council.  This would be achieved by undertaking a survey of South
Lanarkshire businesses and would complement the wide range of promotional activity and
training already being undertaken. 
The online survey was open from 2 to 30 September 2022.  The survey was marketed via social
media channels and cascaded to 13 partner organisations, as detailed in the report, to share
with their client bases.  An email was also sent, by the Economic Development Lead Officer on
Construction Sector, to all relevant businesses on the FAME database of companies to which
Economic Development subscribed. 
5

Page 6

Overall, 243 respondents completed the questionnaire, 221 of which were located in South
Lanarkshire.  This was considered a good return for this form of engagement and for the
timescale the survey was open.  Information on the make-up of the respondents, the main
findings of the survey and observations from the survey were provided in the report. 
Details of other supplier engagement events and activities were detailed in the report, as well as
information on the Meet the Real Buyer event held on 22 February 2023. 
The review of the survey responses confirmed that the range of actions which were being
progressed under the current action plan in relation to training and awareness raising, were
highly relevant.  However, further activity would take place focusing on the preparation of an
awareness and training plan for 2023/2024 to extend the reach to more businesses. 
A second business survey would be completed in 2024/2025, the results of which would allow a
comparison to be made with results from the one completed in 2022/2023. 
The Head of Finance (Transactions) responded to a member’s question on increasing feedback
on the tender processes. 
The Commission decided: that the report be noted and proposed further actions
pursued. 
Councillor Chalmers left the meeting during this item of business 
6 Community Benefits Associated with the Council’s Affordable Housing Supply
Programme
A report dated 18 May 2023 by the Executive Director (Housing and Technical Resources) was
submitted providing:- 
 an overview of the approach taken by South Lanarkshire Council to enable maximum
community benefits from construction projects within its Affordable Housing Supply
Programme and non-domestic estate
 examples of recent South Lanarkshire Council-led construction projects that had direct
contribution to the Community Wealth Building (CWB) ambitions across South Lanarkshire 
Within the ‘Land and Property’ Pillar of the South Lanarkshire CWB Strategy, the Council’s
Housing and Technical Resources was responsible for delivering actions to increase the supply
of affordable housing within South Lanarkshire and ensuring consideration was given as to how
this would also result in wealth being generated or retained locally. 
As set out in the South Lanarkshire Local Housing Strategy 2022 to 2027, increasing the supply
of affordable housing would be achieved, in part, through the delivery of the Council’s Affordable
Housing Supply Programme which aimed to deliver a further 1,300 additional council homes by
31 March 2028. 
The delivery of new council housing supply attracted significant levels of grant funding from the
Scottish Government, alongside sustained investment from the Council’s Housing Revenue
Account.  As such, opportunities existed to ensure this funding generated direct and indirect
benefits for local people, businesses and services, in addition to positive outcomes for new or
existing South Lanarkshire Council tenants.
6

Page 7

Each year, Scottish local authorities spent significant sums on works, goods and services that
were essential to the delivery of public services in local communities.  In procuring such works,
there were opportunities to consider and implement a range of initiatives that would promote
skills, training, apprenticeships and employment of local people.  Details of the community
benefits and how those aligned with CWB were detailed in the report.   
Examples of projects contributing to the CWB agenda, including the community benefits
acquired from each, were detailed in Appendix 1 to the report. 
The Strategy and Policy Adviser responded to a member’s questions on delivery and
assessment of the Community Benefit Programme and reviewing the Community Benefits
Menu. 
The Commission decided: 
(1) that the approach taken by the Council to enable the maximum community benefits from
construction projects within its Affordable Housing Supply Programme and non-domestic
estate be noted; and 
(2) that the examples provided in Appendix 1 to the report be noted. 
J Pravinkumar left the meeting during this item of business 
7 Community Wealth Building Scottish Government Consultation
A report dated 10 May 2023 by the Executive Director (Finance and Corporate Resources) was
submitted presenting the South Lanarkshire response to the Scottish Government’s consultation
on Community Wealth Building (CWB), which was developed by the CWB Progress Group on
behalf of the Commission. 
In the Programme for Government 2022/2023, the Scottish Government indicated that it would
hold a consultation on CWB legislation.  The consultation was launched on 31 January 2023
and sought views on what was required to accelerate and deepen CWB in Scotland.  The
extended closing date for responses was 9 May 2023. 
At its meeting on 28 February 2023, the Commission agreed that the CWB Progress Group
would develop a South Lanarkshire response to the consultation which would be submitted on
behalf of the Commission once approved by the Chair. 
The key topics within the consultation were whether and in what form, to introduce a duty to
advance CWB; how best to support such a duty and whether there were any changes to
Scottish legislation which could accelerate or support the 5 pillars.  In relation to the duty to
advance CWB, there were 3 options which were detailed in the report. 
The South Lanarkshire response supported option A as the most effective and proportionate
approach, the reasons for which were detailed in the report. 
The full South Lanarkshire response to the consultation was attached as Appendix 1 to the
report.  The response addressed all the questions outlined in the consultation and supplied
suggestions and reflections across all 5 pillars of CWB.  The response was compiled from input
by members of the CWB Progress Group and also benefited from the Glasgow City Region draft
response which was circulated to Commission members in April 2023. 
The Head of Finance (Transactions) responded to a member’s questions regarding the size of
contracts and making them more accessible to smaller groups and the retrofit supply chain.
7

Page 8

The Commission decided: that the report be noted. 
[Reference: Note of 28 February 2023 (Paragraph 7)] 
8 Community Wealth Building Action Plan Q4 Update
A report dated 16 May 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on the Quarter 4 update on the Community Wealth Building (CWB) Action Plan. 
The CWB Action Plan had been approved by the Commission at its meeting on 6 September
2022.  The report provided an update on the actions contained within the Action Plan for the 12
month period April 2022 to March 2023. 
The Strategy and Policy Adviser responded to a member’s question on the Community Energy
Efficiency Fund Programme and delays with the supply of materials. 
The Commission decided: that the report be noted. 
[Reference: Note of 6 September 2022 (Paragraph 7)] 
9 Forward Programme for Future Meetings
A report dated 18 May 2023 by the Executive Director (Finance and Corporate Resources) was
submitted advising of the forward programme for meetings of the Commission and inviting
members to suggest topics for inclusion in the Commission’s forward programme. 
The Commission decided: that the report be noted. 
10 Any Other Competent Business
There were no other items of competent business.
8

Page 9

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 5 September 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Wealth Building Action Plan 2023 Refresh 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Commission with the Community Wealth Building (CWB) Action Plan
for 2023/2024, following a review of the actions at the end of year 2 of the CWB
Strategy
[1purpose]
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):-
[]
(1) that the draft CWB action plan, attached at appendix 1, be approved.
[1recs]
3. Background
3.1. At the first meeting of the CWB Commission on 31 August 2021, the Commission
approved an action plan to accompany the CWB Strategy. 
3.2. Performance reports detailing progress against the action plan have been presented
to the Commission at Q2 and Q4 for years 1 and 2 of the Strategy.  Following
presentation of the latest Q4 progress report on 6 June 2023, the action plan has
been reviewed to remove completed actions and to refresh the remaining actions for
year 3 of the Strategy. 
3.3. This report presents the refreshed action plan for 2023/2024. 
4. CWB Action Plan – 2023 Refresh
4.1. All actions within the action plan have been reviewed by lead officers for the CWB
pillars to remove completed actions and refresh the remaining actions, adding new
actions or rewording actions as required. 
4.2. The refreshed action plan will continue to be monitored and reported through the
Improve performance management system.  Progress updates will continue to be
provided to the CWB Commission at Q2 and Q4. 
5. Next Steps
5.1. If approved, the draft CWB action plan will be uploaded to the performance
monitoring system Improve, which will be used to provide progress reports to the
Commission at Q2 and Q4. 
6. Employee Implications
6.1. There are no direct employee implications. 
3
9

Page 10

7. Financial Implications
7.1. There are no direct financial implications. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
9. Other Implications
9.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. Consultation was undertaken internally via the officer group for CWB and with
partners via the CWB Progress Group. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
17 August 2023 
Link(s) to Council Values/Priorities/Outcomes
• Promote Performance Management and Improvement 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk  
10

Page 11

Spending 
We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Expand the capability
of local business and
social enterprises to
bid for public sector
contracts with support
from economic
development and
procurement teams 
Provide support to
local sectors based on
an assessment of
current capabilities
ensuring support from
Supplier Development
Programme (SDP)
Deliver training events on
public sector procurement
for relevant contracts
including quick quote 
March 2024
Promotion of free
procurement training
aligned with the continued
support of the SDP
ensuring that all Business
Gateway advisers are
aware of the programme
and what it delivers 
March 2024
Increase the level of spend
with local companies
Annual 
Increase the number of
registrations with Public
Contracts Scotland
tendering portal
Annual 
Increase the number of
registrations with Supplier
Development Programme 
Annual 
Increase the contracts
awarded to local
companies
Annual 
Consider long term
economic development
growth opportunities
across South Lanarkshire
March 2025
Supplier Development
Programme to assist small
and medium-sized
enterprises (SMEs) to
develop the required suite
of supporting policy and
practical documentation to
submit bids for council
works contracts
March 2024
Continue to review the
range of support provided
to businesses wishing to
engage and identify
measures to increase
capability 
March 2024 
11

Page 12

We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Report on the findings of
the Market Capacity
Assessment to understand
the capability of the food
and drink sector to supply
food and drink to the
Council 
September
2024
Build on our
knowledge of market
supply through further
analysis of local
capacity to identify
new opportunities for
local business to grow 
Assess local markets,
their existing capacity
and willingness of
business to grow
together with the
identification of
appropriate contract
opportunities
Identify opportunities for
local SME's to increase
spend working with various
agencies
March 2024
Encourage local suppliers
to bid for Scotland Excel
and HubSW contract
opportunities
March 2024 
Identify the opportunities
presented from the review
of the Grow Local
management information
that should allow more
local business to bid for
prospective work 
March 2024
Promote the Council’s
contract register as a
source of information to
interested parties
March 2024
Enact the changes
necessary to the council
contract terms and
conditions to capture levels
of sub-contracting spend 
March 2024
Increase the levels of
pre-market
engagement before
commissioning to
shape the preparation
of tender requirement
and prepare potential
local bidders
Assess those
procurement
opportunities where
pre-market
engagement would be
considered beneficial
Utilise support from
Supplier Development
Programme to facilitate
engagement, using their
marketing and social
media channels, plus
webinars and early
engagement events 
March 2024
Maintain liaison with Tier 1
contractors to promote
SME engagement for sub-
contract opportunities and,
where possible, obtain
details of successful
awards
March 2024
12

Page 13

We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Earlier identification of
potential contracts and
cascading of this
information to the relevant
businesses
March 2024
Increase promotion of
tender opportunities to
local sectors 
Use a range of
communication
methods to advertise
opportunities to
potential bidders
Conduct supplier events
and increase the use of
social media
March 2024
Supplier Development
Programme to raise
market awareness of
opportunities using their
marketing and social
media channels, plus
webinars
March 2024
Specific promotion of quick
quote opportunities 
March 2024
Review of the detailed
feedback from SDP
following the Meet the Real
Buyer event 
September
2023
Improve the
environmental
outcomes from
procurement 
Review sustainability
requirements for
contracts
Progress the Flexible
Framework Sustainability
action plan to further
embed good procurement
practice 
March 2024
Work with anchor
institutions to explore
further opportunities
for more local spend
Identify those anchor
organisations willing to
participate and
promote contract
opportunities to local
SMEs and social
enterprises
Complete an exercise to
identify common areas of
interest with other anchor
organisations
March 2024
Assessment of tender
opportunities and
development of
collaborative procurement
routes
March 2025
For our lower value
procurement processes
NHS Lanarkshire will
ensure, where possible,
that at least half of the
suppliers invited to quote
are based in the
Lanarkshire area 
March
2024
13

Page 14

We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Maximise our
approach to
community benefits
and social investment 
Review of the changes
to delivering increased
levels of community
benefits and
identification of new
opportunities to
improve community
outcomes
Implementation of
community benefits
monitoring system
June 2025
Monitor the wish lists
delivered from community
benefits
March 2024
Conduct a review of the
adoption of the Fair Tax
Mark accreditation for
contracted suppliers
March 2025
Review of the approach to
Fair Work First and
Community Benefit to
deliver social investment
and increase positive
social impact
March 2025
Put in place greater levels
of monitoring in relation to
compliance with the range
of charters
March 2025
Review procurement
practices to deliver
more local spend
where possible
Consideration of the
changes that could be
made to the way
contractual
opportunities are
presented to the
market and evaluated
in support of
community wealth
building objectives
Review the contract
evaluation criteria for
regulated spend and
potential for increasing
tender opportunities for
local business
December
2023
Review standing orders to
identify changes that could
increase opportunities for
local spend
May 2025 
14

Page 15

Workforce 
We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Promote Living Wage
and Fair Work
practices locally
demonstrating this
within our own
working practices 
Ensure that all Anchor
organisations including
South Lanarkshire
Council have adopted
the Living Wage as well
as Living hours and fair
work practices
We will continue to
advocate the Living Wage
and work on developing
living hours along with our
Community Planning
Partners and Anchor
Organisations
March 2024
Support our local
businesses to create
fair working practices
Continue to ensure that all
businesses and third
sector organisations who
engage with the Council
are encouraged to adopt
the Living Wage and a fair
work approach to
employment practices
March 2024
Provide webinars and
support to understand
impact of Fair Work, for
employers and
communities
March 2024
We will improve the
percentage of
applicants from South
Lanarkshire SIMD
areas who secure work
with Living Wage
accredited employers
Our employability projects
will work with managers to
identify pre employment
training and skills required
for entry level jobs as well
as building on existing
work to prepare our local
residents for interview and
improve their employability
March 2024
March 2024
Identify employability
support staff to
provide local
employability support
to local applicants 
We will continue to
deliver employability
programmes which help
local residents into
work
We will map the extent of
employability support with
partners - identifying
strengths, gaps and areas
for development
March 2024
Identify areas of
anticipated future
demand through
workforce planning
and put in place
training programmes
and access to
qualifications to match
this 
Work with our own
services and public and
private sector partners
to identify the skills they
need to grow and
create wealth in the
local economy,
including skills needed
for the transition to a
net-zero economy
We will work with our own
services and with partners
on our Local Employability
Partnership, local business
organisations including
Federation of Small
Businesses and
Lanarkshire Chamber of
Commerce. The purpose is
to consult with these
communities – gathering
data on their immediate as
well as future skills needs.
We will develop existing
relationships with Scottish
Enterprise, Business
March 2024
15

Page 16

We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Gateway and Skills
Development Scotland to
ensure that up to date
labour market and demand
led data is informing our
plans and developing our
skills and knowledge
training
Be responsive to
business and Social
Enterprise needs
We will further develop our
Upskilling Programme to
ensure it is meeting
demand led skills
requirements and
qualifications from local
SMEs and Social
Enterprises in particular
March 2024
We will work with new
businesses to ensure
residents are upskilled
prior to launch date
through pre-employment
training and employability
support
March 2024
Screen vacancies for
suitability to local
labour market 
Promote the Council
and partners as an
‘Employer of Choice’
highlighting our
excellent Terms and
Conditions and
opportunities for flexible
working
Build on work ongoing with
targeted recruitment in
Employability Services,
ensuring that applicants
are supported to apply for
vacancies with the Council
and partners as well as
receiving pre-employment
training where required.
Use available funding to
support job opportunities
for local people within
council
March 2024
Continue to support
local residents and
businesses through our
extensive employability
programme of support
We will continue to work
with local companies and
residents to ensure we
reach the best fit of local
vacancies to skills.
Investing in training and
employability support
where required 
March 2024
16

Page 17

We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Identify potential
numbers and roles for
Modern
Apprenticeship (MA)
opportunities with
managers in the
Council and work with
Skills Development
Scotland (SDS) to
reflect these in the
contract 
Identify suitable Modern
Apprenticeship
opportunities within the
Council over next 2-5
years
Work with Resource
Workforce Plans to identify
numbers and MA
occupational areas, and
build on MA frameworks to
create training which
meets the needs of the
Council
March 2024
Engage with SDS to
agree MA priorities at
national and local level
Modern Apprenticeship
opportunities a standing
item for discussion at local
employability partnership
meetings
March 2024
Work with Education
Resources to identify
suitable Foundation
and Modern
Apprenticeship
journeys
Monitor progress of
Foundation Apprenticeship
candidates who are
ready/suitable for Modern
Apprenticeship
opportunities. Put in place
any additional supports
required
March 2024
Explore with Scottish
Government the
possibility of using
Youth Guarantee
funding to support
these additional
Modern
Apprenticeship roles
Review the funding
streams available to the
Council to support
training including
Modern
Apprenticeships
Examine the terms and
conditions of these funding
streams to identify best
option for funding or part-
funding Modern
Apprenticeship
programmes and other
training opportunities
March 2024
Put in place options for
trainee positions
including modern
apprenticeships using
workforce plans and
funding criteria to
maximise effectiveness
Use different funding
streams to leverage best
available options for
sustainable traineeships.
Link to work with DYW –
Developing the Young
Workforce
March 2024 
17

Page 18

Land and property 
We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Continue to deliver an
Affordable Housing
Supply Programme 
Increase the supply of
affordable housing
across South
Lanarkshire 
Deliver the Strategic Local
Programme Agreement
(SLPA)
March 2024
(Annual)
Preparation and approval
of the Strategic Housing
Investment Plan (SHIP) 
October
2024
(Annual)
Implement policy on
affordable housing in new
private developments in
South Lanarkshire Local
Development Plan 2
March 2024
(Annual)
Continue to operate
and further develop the
Open Market Purchase
Scheme 
Identify and purchase
appropriate properties
to meet specific
housing needs 
Promote and advertise
scheme in targeted areas
March 2024 
Target of 120 properties
purchased through Market
Purchase Scheme for
2023/2024
March 2024 
Identify opportunities
for housing led
regeneration projects 
Continuous
assessment of
regeneration priorities
as part of Local
Housing Strategy
process
Considered as part of
annual review of Local
Housing Strategy
March 2024
(Annual)
Identified priority projects
included as part of SHIP
development
October
2023
(Annual)
Ensure priority projects are
included as part of the
preparation of the next
South Lanarkshire Local
Development Plan 3
March 2024
(Annual)
Support owners of
empty homes to bring
them back into use 
Continue to target
long-term empty
homes to bring them
back into effective use
and contribute towards
meeting housing
needs with a target of
15 set for 2023/2024
Establish a Matchmaker
Scheme to link empty
properties with interested
buyers
March 2024
(Annual)
Set up an empty home
grant scheme providing
financial support for
owners to improve property
condition
Provide practical advice
and assistance to empty
property owners
18

Page 19

We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Promote and support
the Community Asset
Transfer (CAT)
process 
Increasing number of
asset transfers 
Support asset transfer
through:- 
• Continued promotional
work
• Continuation of CAT
Officer Post to support
community interest
• Grow Community
Capacity 
March 2024
(Annual)
Annual evaluation of
the ‘value’ of asset
transfers to
communities and
community wealth
building (CWB)
Co-design an evaluation
tool with a 1-2 completed
CAT groups 
Pilot and test 
Develop the tool and CWB
indicators 
March 2024
(Annual)
Deliver improvements
to support the Energy
Efficient Scotland
programme and
encourage
homeowners to do the
same 
Continue to improve
the energy efficiency of
the Council’s housing
stock contributing
towards national
climate change
ambitions 
The Housing Investment
Programme will continue to
incorporate sustainable
changes to the Council’s
housing stock, working
towards increasing the
number of properties that
meet the relevant energy
efficiency standards for
social housing
March 2024
(Annual)
Continue to implement
energy efficiency
measures across
council and partner
facilities including
investment in
renewable energy
solutions and low/
zero-carbon heating
Deliver a range of projects
as part of the Community
Energy Efficiency Fund
programme
March 2024
(Annual)
Reduce embodied carbon
from construction (new
builds and refurbishment)
Continue to maximise
external funding to
support owners and
private rented
properties to improve
their property
Work with partners,
including Home Energy
Scotland, to provide advice
and support to owners and
private landlords on
funding opportunities
available to them
March 2024
(Annual)  
Implement and administer
the Energy Company
Obligation (ECO) scheme
within South Lanarkshire
March 2024
19

Page 20

We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Repurpose neglected
town centre assets to
encourage footfall and
spend in the local
economy, and create
thriving places where
people can access
goods and services on
foot or via public
transport 
Take the “20-minute
neighbourhood”
concept into account
when planning capital
schemes 
Include “20 minute
neighbourhoods” within the
scoring criteria when
assessing bids for UK,
Scottish Government and
Council funded capital
schemes 
October
2023
(Annual) 
Apply the principles of
Community Wealth
Building to spatial
planning decision
including the
preparation of South
Lanarkshire Local
Development Plan 3
(SLLDP3) and the
assessment of
planning applications
Ensure SLLDP3 supports
the principles of Local
Living and community
wealth building 
Submission of Evidence
Report 
Prepare guidance to aid
the assessment of
planning applications 
Approval of proposed Plan
followed by consultation
and examination 
Adoption of Plan 
September
2024 
December
2024 
October
2025 
December
2027 
Look to ensure that
Council-led physical
regeneration schemes
have input from other
anchor institutions and
key partners and
enable sharing and
participation form the
community and
voluntary sectors
Engage with public,
private and voluntary
sector partners to
marry-up aspirations
and pool funding to
add value and deliver
one-stop service
provision
Ensure cross sector-
partners are aware of
planned projects and
opportunities for
collaboration
October
2023
(Annual) 
20

Page 21

Finance 
We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Building on the
relationship we already
have with local credit
unions (CUs), we will
work locally with the
credit unions and other
community partners to
explore ways to
encourage use of the
savings and affordable
credit facilities which
they offer 
Establish working
relationships with CUs
and community
partners to promote
savings and affordable
credit
Work with communities to
grow credit unions by
promoting savings and
affordable credit
March 2025 
21

Page 22

Building the generative economy 
We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Continue to develop
how business grants
can help grow
communities 
Offer targeted support to
South Lanarkshire
businesses, enabling
them to create and
safeguard jobs, increase
turnover and profit 
Develop sector specific
programmes (tourism,
food and drink, social
enterprises, green
economy, construction,
manufacturing etc)
March 2024
(Annual)
Signpost businesses to
other sources of help and
advice
March 2024
(Annual)
Promote investment
opportunities to regional
and national institutions
to market South
Lanarkshire as a place
to visit and do business 
Develop a
marketing/investment
strategy, including a
promotional programme
with targeted/seasonal
events and promotions
around key employment
sectors 
Create a site prospectus March 2024
(Annual)
Improve web presence/
on line material 
March 2024
(Annual)
Ensure planning and
other statutory advice is
up-to-date and accessible
March 2024
(Annual)
Create a positive
environment for third
sector organisations
where local anchors
offer development
support 
Develop a new strategic
agreement with the
Third Sector 
Establish a high level
review group and
comprehensive
engagement process for
the review
March 2024
Implement the new
strategic agreement with
the Third Sector 
High level strategic
agreement group
overseeing actions
March 2025
Support our social
enterprises and key
Third Sector
organisations to
generate more of their
own funding 
Review resourcing and
funding the Third Sector 
Establish a cross-partner
review group
and agree terms of
reference
March 2025
Implement new funding
arrangements for Third
Sector 
Develop options for new
funding arrangements for
Third Sector
March 2025
Develop a new Social
Enterprise Strategy and
Action Plan
Deliver the objectives
outlined in the social
enterprise strategy
2023-2027
Deliver actions under the
key priorities of
Stimulating Social
Enterprise, Developing
Stronger Organisations
and Realising Market
Opportunity
March 2024
22

Page 23

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 5 September 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Wealth Building Annual Report 2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 present a draft of the Community Wealth Building (CWB) annual report for
2022/2023 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) that the draft annual report, attached as Appendix 1, be approved
3. Background
3.1. The Council approved a CWB Strategy on 10 March 2021.  Subsequently, the CWB
Commission was set up to engage a wide range of partners and stakeholders in the
CWB agenda. 
3.2. To support formal reporting of progress against the Strategy, the Commission
agreed, on 7 February 2022, that annual reports should be produced to highlight
progress and showcase examples of significant work under the 5 pillars.  The annual
reports also provide a vehicle for communicating the purpose of CWB and why the
Council and partners believe CWB is an important way of working in South
Lanarkshire.  The first annual report, covering year 1 of the Strategy, was presented
in final form to the Commission in September 2022. 
3.3. This report presents a draft of the second Annual Report, covering 2022/2023, for
approval. 
4. Annual Report Purpose and Content
4.1. The Commission agreed, in August 2021, to monitor the CWB action plan through
progress reports at Q2 and Q4, covering the periods April to September and April to
March respectively. 
4.2. While the performance reports provide an update on the progress of the action plan,
the Commission agreed there was scope to reach a wider audience and to enhance
communications around the CWB agenda by presenting progress in a more
accessible format.  An annual report offers the opportunity to take stock of what has
been achieved in the year and to restate the aspirations of the Council and partners
to champion CWB across all aspects of service planning and delivery. 
4
23

Page 24

4.3. The annual report does not replace the formal reporting of Q2 and Q4 progress but
allows a more public-facing and accessible presentation of information, using key
points and case studies to illustrate CWB in action.   
4.4. The draft Annual Report is attached as Appendix 1.  The report covers the 12 month
period April 2022 to the end of March 2023.   
4.5. This following table summarises the structure and content of the annual report. 
Section Content
Introduction  Written by the Chair of the CWB Commission - this reflects on
the importance of CWB as a new approach involving key anchor
organisations in South Lanarkshire
What is CWB What is CWB and why are we doing it - this revisits the
background to CWB and outlines the 5 pillars
Progress and
case studies
This section of the annual report takes each pillar in turn and:
• reviews the aims of the strategy
• highlights progress made; and
• provides case studies to illustrate the work of the Council
and partners under this pillar
Conclusion Sums up progress and reaffirms commitment to CWB which we
will deliver through the continuation of the 5-year action plan 
4.6. A wide range of case studies has been used to illustrate CWB principles and to show
where the approach is having an impact in South Lanarkshire.  Case studies have
been grouped under the 5 pillars, however, they have been selected to illustrate the
benefits of the approach for businesses, communities and individuals and also, to
recognise a geographical component, with examples of progress across both urban
and rural areas in South Lanarkshire. 
4.7. The Commission is asked to approve the content of the annual report. 
5. Employee Implications
5.1. There are no direct employee implications. 
6. Financial Implications
6.1. There are no direct financial implications. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change implications as a result of this report. 
8. Other Implications
8.1. None. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
17 August 2023 
24

Page 25

Link(s) to Council Objectives/Values/Ambitions
• Accountable, efficient and effective 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk  
25

Page 26

Appendix 1 
South Lanarkshire
Community Wealth Building
Annual Report 2022 – 23 
DRAFT 
26

Page 27

Contents 
Introduction 
What is Community Wealth Building? 
Progress and case studies 
• Spending
• Workforce
• Land and property
• Finance
• Building the generative economy 
Conclusion 
27

Page 28

Introduction 
In March 2021 South Lanarkshire launched its Community Wealth Building Strategy.  The
strategy set out an aspiration to work in a new way for the people of South Lanarkshire, to
use the power and Influence of the council and other organisations to support communities
and the South Lanarkshire economy. 
The challenges of the last few years, and the ongoing cost of living which has gathered
pace since the end of the pandemic, continue to underline the importance of local services
rooted in local places and communities.   
South Lanarkshire Council and the South Lanarkshire Community Planning Partners are
committed to improving the lives and prospects of everyone in South Lanarkshire.  We
recognise and celebrate our role as a key anchor organisations, delivering services across
the area, championing South Lanarkshire and working ceaselessly for the benefit of those
who live, work, visit and do business here. 
This annual report looks back at the second year of our Community Wealth Building
Strategy.  It highlights the progress we have made so far and reaffirms our determination to
continue the journey, continually seizing opportunities to build the wealth, capacity and
resilience of our communities.  We have brought together a range of case studies to
illustrate Community Wealth Building in action, showing how the council and partners,
working alongside communities, can use their energies, influence and resources to
generate real change across South Lanarkshire. 
Chair of the Community Wealth Building Commission 
28

Page 29

What is Community Wealth Building? 
Community Wealth Building is an alternative approach to traditional economic development,
which seeks to develop resilient, inclusive local economies, with more local employment
and a larger and more diverse business base. 
Community Wealth Building reorganises local economies to be fairer and aims to reduce
wealth flowing out of our communities, towns and cities by helping local investments and
assets to generate more and better jobs for local residents and businesses. 
To achieve this transition, CWB harnesses the power of anchor institutions to enable local
economies to grow and develop from within. Anchor institutions are large commercial,
public and social sector organisations which have a significant stake in a place and can
exert considerable influence on their local economies. 
CWB changes how anchor organisations work to maximise local and regional economic
opportunities. This includes the goods they buy, the people they employ, the assets they
own and the powers they exercise to bring about long-term, sustainable economic change
for the benefit of local communities and local businesses. 
5 strategy areas are identified relating to the pillars of community wealth building.  These
are: 
• Building the generative economy - Develop and grow small, locally owned
enterprises which are more financially generative for the local economy - locking
wealth into place.
• Finance - Increase flows of investment within local economies by harnessing and
recirculating the wealth that exists, as opposed to attracting capital.
• Land and property - Deepen the function and ownership of local assets held by
anchor institutions, so that financial and social gain is harnessed by citizens.
• Spending - Utilise public sector procurement and commissioning to develop dense
local supply chains of businesses likely to support good employment and retain work
locally.
• Workforce - Exercise fair employment practices and work to develop a more just
labour market to improve the prospects and wellbeing of local people. 
29

Page 30

Spending 
The spending pillar is about leveraging public sector procurement and commissioning to
develop dense local supply chains of businesses likely to support good employment and
retain work locally. 
Our Strategy set out how we would achieve this, building on close analysis of our spend
and a range of actions to make procurement processes simpler and more accessible to
local businesses. 
How we have supported Community Wealth Building
• The council co-hosted the following SLC specific events with Supplier Development
Programme, including:
- 07-Jun-22 Meet the Contractor - Morrison Construction
- 23-Aug-22 Talking Tenders with South Lanarkshire Council
- 27-Sep-22 Talking Tenders with Scotland Excel for the Property, Maintenance
and Refurbishment Framework
- 24-Nov-22 Talking Tenders with South Lanarkshire Council
- 15-Dec-22 South Lanarkshire Council Supplier Engagement Event:
- Roads and Infrastructure Framework
- 30-Jan-23 South Lanarkshire Council Supplier Engagement Event: Roads and
Infrastructure Framework
- 06-Apr-23 South Lanarkshire Council & Social Enterprises: A Conversation about
Public Sector Contracts
• The council co-hosted a Meet the Real Buyer event in Feb 2023. There were 632
registrations for the event, 337 of whom attended on the day – an impressively
attendance rate for such an event. Attendees represented 200 unique Scottish SME
businesses, with 78 being based in South Lanarkshire.
• A supplier engagement survey was undertaken with South Lanarkshire businesses
to understand levels of knowledge, capacity and potential barriers to bidding for
contracts. The analysis and conclusions were presented to the CWB Commission in
June 2023 (see Supplier Engagement Survey case study below).
• A series of three engagement events were facilitated by SDP on behalf of NHS
Lanarkshire; these included Talking Tenders with NHS Lanarkshire (214 bookings
and 168 attendees), NHS Supply Chain Partner Engagement event (37 bookings/26
attendees) and a bespoke NHS Tender Training event, Electrical and Plumbing
Framework (18 booked/9 attended).
• NHS Lanarkshire continue to support and promote the National community benefits
portal. NHSL have had 8 community needs uploaded, and so far 2 have been picked
up and delivered. Further work will focus on encouraging more suppliers to use the
portal. Opportunities for joint working with the council will also be explored.
• A Market Capacity Assessment was undertaken to understand the capability of the
food and drink sector to supply food and drink to the council. The analysis on the
capability of local food and drink businesses to supply food to the different council
buyers was carried out from July to October 2022 with consultations with council
services, local businesses and external partners.
• The Community Wish List webpage was launched in March 2023 and initial enquiries
logged. Community Wishlist and Benefits officer have joined the working group
developed by the City Deal team looking at community wishlists across the region.
• A local spend analysis was carried out to inform the scope and targeting of work to
increase local spend – see Analysis of Local Spend case study below. 
30

Page 31

How it’s working in South Lanarkshire: 
Case study: Local firms see success in bidding for council contracts 
South Lanarkshire Council revised its procurement processes for works contracts in 2021
which meant that we could now offer local suppliers to tender for works via the Quick Quote
system for contracts between £50,000 and £2 million. Two local examples who have
benefitted from the quick quote process are Joseph Leckie and Sons and Clyde Windows
and Construction. 
Joseph Leckie and Sons, based in Hamilton were successful in being awarded a contract
for the ground and brickworks for the Castlefield Primary School extension in East Kilbride.
This contract was awarded in September 2022 and totalled £164,197. 
Prior to the revisions to our quick quote procedures a contract of this size would have
needed to go through a full procurement process, making it more difficult for businesses to
submit tenders – a factor which has been a contributing factor in the past to them not
tendering for works with us. 
However, thanks to marketing of the revisions to our quick quote processes, as well as the
efforts of the Supplier Development Programme via their suite of webinars and networking
opportunities, we have been able to get the message out to the local business base that it
is now much easier to tender for works opportunities with South Lanarkshire Council. 
Gordon Leckie (Managing Director – Joseph Leckie and Sons) said that “in the past
tendering for a contract of this size with SLC would have taken a significant amount of time
and effort on our part, the fact we were able to submit a Quick Quote made the whole
process much easier for us”. 
Clyde Windows and Construction are based in Larkhall and were successful in securing a
contract valued at £26,000 for replacement windows at our Universal Connections facility in
Hamilton. Although this contract was under the previous threshold Clyde Windows had not
been successful before in tendering for work with South Lanarkshire Council. Their
Managing Director, Dax Duckett, was clear that participating in the Build Lanarkshire
programme and attending the Supplier Development Programme webinars – where
information and advice was given on the changes to our tendering processes, and what
contracts will be coming in the near future – were instrumental in securing this work. 
Dax stated that “knowing that South Lanarkshire Council are not only making it easier to
tender for contracts via quick quote, but the fact they will be offering local businesses the
opportunity to apply for these, gives me confidence going forward that we will be able to be
successful in tendering for larger contracts”. 
Case study: South Lanarkshire Council analysis of local spend 
Over the course of 2022-23, South Lanarkshire Council undertook a detailed analysis of its
procurement spend in the previous year – a total sum of around £346m.  Understanding
where public money is being spent is one of the foundation-stones of a robust CWB
approach and a crucial first step in looking at how more of the spend can be channelled to
the benefit of local companies and the local economy. 
The chart below shows a geographical analysis of the council’s spend in 2021/22, showing
that £62m went to South Lanarkshire companies, increasing to £120m when the whole of
Lanarkshire is taken into account.  Companies within the Glasgow City Region accounted
for £171m of spend.
31

Page 32

The council’s analysis looked in detail at the council’s highest spend areas – Social Care
and Construction, which together represented over 50% of procured spend.  The analysis
showed that Social Care spend accounts for 31% of council spend (£108.8m). Although
only 30% of this spend is with local enterprises, the vast majority of this spend is for care
delivered within the council area on residential and community services, supporting local
employment at a living wage level. Spend outwith the local area will indicate the registration
of the company is not in South Lanarkshire, although the care is being delivered, and
supported by employment, in the local area. 
Construction accounts for 25% of council spend (£89.4m) and although only 17% of
construction spend is local, there are higher levels of spend retained within Glasgow City
Region (75% overall). 
Spend outwith Scotland in 2021/2022 totalled £125.7m, of which 65% was spent in the
South of England or London. Highest categories of spend by business area were Financial
Services, Social Care, Waste and ICT. Although spend on Social Care and Waste services
were to companies registered outwith Scotland, these contracts are delivered within South
Lanarkshire in local care homes and waste facilities and make a significant contribution to
local employment. 
The full local spend analysis was presented to the CWB Commission in September 2022
and the insights gained are being used to shape future actions under the spend pillar of the
CWB strategy and action plan. 
Case study: Supplier Engagement Survey 
A key objective of the Community Wealth Building (CWB) Strategy is to increase the levels
of spend by the Council and anchor institutions within the South Lanarkshire area. An
action plan supports the Spend Pillar of the Strategy and includes reviewing the processes
for how the Council procures, engages and supports businesses and identifies and
promotes increased tender opportunities. 
The CWB ’Spend Pillar’ Group agreed that ascertaining the skills, experience and thoughts
of the local business base would help to further tailor how to support these businesses
going forward in relation to increasing the number of local Small Medium Enterprises
(SMEs) securing contracts with South Lanarkshire Council. This could be achieved by
undertaking a survey of South Lanarkshire businesses, which would complement the wide
range of promotional activity and training already being undertaken. 
32

Page 33

The online survey was open from 2 to 30 September 2022. The survey was marketed via
social media channels (Twitter, Facebook and Linkedin) and was also cascaded to a range
of partner organisations to share with their client bases. An email was also sent to all
relevant businesses on the FAME database of companies (981 listed) which Economic
Development subscribe to. 
Overall, 243 respondents completed the questionnaire, 221 of which are located in South
Lanarkshire. This is considered a good return for this form of engagement and the
timescale the survey was open. 
The main findings are:- 
• 71% of respondents feel they know where to access public sector opportunities.
• Of the businesses who tendered for contracts with the Council over the past 2 years,
81% found the tender process easy to follow.
• 65% are aware of the Quick Quote process.
• 86% are aware of Public Contracts Scotland.
• 60% found the feedback received from tenders to be good or excellent, with 37%
rating it average and 3% rating it poor.
• 82% are willing to invest in additional resources to bid for public sector contracts.
62% of respondents feel they have the skills/knowledge/experience in their business
to tender for public sector contracts.
• 84% of respondents were not aware of the change to standing orders allowing works
contracts up to £2 million to be tendered for via Quick Quote and of the applicable
respondents; 71% feel this change will make them more likely to tender for such
works.
• 89% have been happy with their involvement in a procurement exercise carried out
by South Lanarkshire Council in the past two years.
• 66% have won a contract with South Lanarkshire in the past 2 years.
• 58% typically bid for contracts with a value less than £0.5m.
• 20% have been involved in the delivery of a South Lanarkshire contract as a
subcontractor.
• 62% of respondents have not received training, support or advice on tendering for
Scottish public sector contract. 
The main barriers to public sector procurement are seen as:-
• lack of training in the requirements of public sector procurement
• lack of awareness of tendering opportunities. 
This survey gives a valuable insight into the knowledge, experience and capacities of local
companies when looking to tender for public sector opportunities.  It also highlights where
more work needs to be done to address the barriers identified and it serves as a guide to
the supports which the council and partners will continue to provide to local businesses. 
33

Page 34

Workforce 
The Workforce pillar of Community Wealth Building required anchor organisations to adopt
and champion fair employment practices and work to develop a more just labour market to
improve the prospects and wellbeing of local people. 
In our strategy and action plan we set out our intention to promote fair work practices and
the living wage, leading by example and encouraging all businesses and third sector
organisations in Lanarkshire to follow suit.  We said we would use our employability
programmes and our training and recruitment activities to maximise opportunities for local
people. 
How we have supported Community Wealth Building
• The council has developed an employability pipeline which creates opportunities for
residents and local communities. We had our first Recruitment Fair in August 2022,
resulting in 53 interviews and 29 job offers. The fair provided us with several learning
points, which included a more tailored approach to geographical area and posts
available. 
• Our second Recruitment fair in February 2023, has increased our conversion to
application from those who attended, with 75% of job seekers completing
applications in Feb 23.
• Through our upskilling programme we have supported 49 businesses; 44 employees
have completed their qualification during the year; and there are 97 employees
currently undertaking a recognised qualification in areas Health & Social Care, Child
Care, Warehousing, Distribution & Logistics, and creative industries.
• The council has continued to deliver a range of pre-employment training
opportunities including in HGC and LGV through our delivery partner Routes to Work
South and in partnership with DWP to support progression to employment in the care
sector.
• We continue to support local Homecare providers who deliver services on behalf of
the council by promoting vacancies and linking opportunities to employability client.
We have upskilled 57 employees in Health & Social Care qualifications through our
Upskilling project.
• We have continued to deliver employer engagement activities with Routes To Work
South. 2022/2023 Programmes such as Making it Work has had 58 registrations, 21
job outcomes 66 training outcomes.
• The council’s established Modern Apprenticeship programme currently has 184 in
training under a range of occupational areas including construction, business and
administration, child care, social care, digital apps and IT support, road workers and
housing assistant. 
How it’s working in South Lanarkshire: 
Case study: AspireWorks 
David was referred to AspireWorks by the Throughcare team.  David is care experienced
and resided in a Children’s House.  His barriers included lack of work experience and
literacy support needs. 
David’s aspirations were to move into employment, he was keen to work in a manual role. 
David was allocated a key worker from the AspireWorks programme who met with him to
carry out an initial assessment and to draw up an individual action plan.   Goals were
identified and barriers were discussed.
34

Page 35

Part of David’s action plan included taking part in work experience, meeting his key worker
to go over employer expectations and employability skills. Also as part of David’s plan he
attended a local training provider who offered construction tasters, this gave David a flavour
of the types of manual work he could try but also gave him a sense of working within a team
and health and safety in the work place.  
During his time on AspireWorks the Care Experienced Employability Focus Group were
running a pilot to support care experienced young people into employment within South
Lanarkshire Council.   David’s commitment and good engagement on Aspireworks made
him a good fit for this initiative. 
David and his key worker met with the recruitment team for initial discussion on possible
employment options.  Following discussions – and taking into account David’s literacy
needs – David was offered a position as a General Operative, which represented a good
match for his interests and needs. 
David was delighted by this and accepted.  His key worker supported David with the
recruitment process to ensure his start date and paperwork were in order.
David then started work as a General Operative and flourished in this role for 12 months.   It
gave him great experience in working in a large organisation and built up his confidence. 
Throughout this time his key worker regularly kept in touch with David and his supervisor for
progress reports. 
David then felt confident to apply for a new post – Modern Apprenticeship in Roads with
South Lanarkshire Council.  Again his key worker supported him through the application
process and David was successful.   David continues in this post and is doing really well.   
Case study: NHS Demonstrator Programme 
The NHS Demonstrator Programme was the result of NHS Lanarkshire and the Local
Employability Partnerships working together to get long term unemployed individuals, aged
25 years and over, back into the labour market by employing them within NHS Lanarkshire
for 6 months within a variety of roles. The aim of the programme was to increase their
confidence, learn new skills and develop employability skills. Here, we hear from Marion, a
Clerical Officer, based in Law House. 
Marion says: “I have loved every minute of the experience of the NHS Demonstrator Project
- the job has been fascinating to learn from start to finish. I have also really enjoyed working
in an office environment again and being part of a team has given me my confidence back
again. It's also good to have some office chat.” 
“"I have received great support from the day I started and feel I can approach my line
manager with any issue.” 
35

Page 36

Land and Property 
This pillar looks to deepen the function and ownership of local assets held by anchor
institutions, so that financial and social gain is harnessed by citizens. 
Our strategy highlighted the importance of affordable housing and the potential of
Community Asset Transfer as a means of giving community more control over local places. 
The strategy aimed to encourage investment and create thriving places where people can
access goods and services on foot or via public transport. 
How we have supported Community Wealth Building
• During 2022/2023, the Council delivered 176 new build council homes as part of its
ongoing Affordable Housing Supply Programme. This included sites across East
Kilbride, Hamilton, Larkhall and Blantyre and equated to over £10million in grant
funding being successfully acquired from the Scottish Government. Key projects
delivered within this included completion of the housing-led regeneration of
Whitlawburn and new technology enabled amenity homes on the site of the former
St Joseph’s primary school in Blantyre.
• The council has unlocked significant community benefits associated with these new
build projects – see case studies below.
• Following the appointment of a dedicated Community Asset Transfer (CAT) Officer,
the CAT process has been refined with online support pages and Learn on Line
training module launched. The CAT process has been promoted with VASLan and
presented to Third Sector Locality Networks. CAT process also presented to all Area
Committees. Specific session held with SFA and football teams across South
Lanarkshire in February.
• The council continues to work with partners to support homeowners and private
landlords to improve energy efficiency within their properties. Recently, this included
sharing opportunities for funding and updates to environmental legislation at a Virtual
Private Landlord Forum in Spring 2023, with over 60 landlords from across South
Lanarkshire in attendance. 
How it’s working in South Lanarkshire: 
Case study: Our Place Our Plan – Burnhill (High Backs Project) 
The Council’s Homes+ programme, supported by funding from the Scottish Government’s
Affordable Housing Supply Programme, continues to deliver significant numbers of high
quality, affordable homes across South Lanarkshire. 
The Burnhill Area has high levels of deprivation and was identified by the Community
Planning Partnership as an area for Locality Planning as defined by the Community
Empowerment (Scotland) Act 2015 with a focus on reducing inequalities. 
The Community Engagement Team work with local stakeholders to address issues raised
through community consultation that are highlighted in the Our Place Our Plan Burnhill
document. The Burnhill Action Group take a lead role in progressing the plan working in
partnership with other organisations and council resources to address the issues local
people highlighted in the plan. 
Burnhill Action Group are a community led group working to support the Burnhill community
through activities, events and initiatives. All activity of the Burnhill Action Group is for the
benefit of the residents in Burnhill and addresses issues relating to local people. 
36

Page 37

Recently the group have developed a derelict piece of land they call the high backs to use
as a community space as there is a lack of facilities locally to host community activity.
Including space for community growing, a potting shed and a poly tunnel, they have
managed to incorporate three outhouses/sheds to be used as a coffee hut, community
pantry and a space for activities. 
Some of the activities and projects being delivered by local people are Wellbeing Hubs,
Family Hubs, CAB Drop in, Parent Café, Youth Action Group, Cooking Courses, coffee
mornings and throughout the year they organise themed community events such as
summer fun days, Easter egg hunts, Halloween events and Christmas Elf Trail for the
whole community and all activities are free to access. The group are currently working on
creating a community pantry to allow local people access to free food and other household
essentials, becoming a free sanitary product outlet and working to create a project plan with
a developer to explore the potential for development in the “High Backs”. 
Burnhill “High Backs” has been different from the other projects we have seen locally as it
has been a genuinely community led with a lot of partnership working from many different
agencies and council departments to address community priorities in one central project to
create a hive of community activity and support.  This project shows that projects like these
can be done anywhere and don’t necessarily need big expensive community halls and that
communities are able to work with partners to deliver key services and allocate resources
differently to support community need. For example it has been identified that cancer
screening rates in the Burnhill area are extremely low so with the help of our partners in
Health, community anchor organisations and funders the volunteers have been able to
deliver out of hours appointments with transport to reduce the barriers to people up taking
these appointments. The volunteers also use their social media platform to promote the
importance of attending routine cancer screening appointments. 
Lizzie, a Burnhill volunteer, sums up the community’s ownership and sense of achievement:
“This area has been overgrown since I was young, residents had loads of concerns about
the land with issues around fly tipping and anti-social behaviour. People wanted to see
more positive things happening in the area and our group has been established to work
with local people. Having a community consultation was great it gave people a chance to
use their voices and sharing their own ideas it was magic. The support of the partners
helped us through hurdles we just couldn’t climb, and they made it achievable. The
activities and the “high backs” have encouraged our community to tackle issues around
mental health, general health and social isolation, we have neighbours who are engaging
with each other who didn’t before this project. We are so blessed to have this area as an
asset we are very fortunate, we would encourage other communities if you have an idea
reach out for support and keep chipping away”.  
37

Page 38

Case study: Delivering affordable homes and unlocking community benefits 
Project 1: Whitlawburn Regeneration, Cambuslang 
Overview
The Whitlawburn masterplan was developed in conjunction with tenants and residents and
funded jointly by South Lanarkshire Council and the Scottish Government. This
development comprised of 170 new homes for the council, including 24 amenity flats and 6
amenity bungalows suitable for older residents or residents with particular needs completed
in October 2022. A further 60 properties have also been constructed to be managed by
West Whitlawburn Housing Co-operative, due for completion summer 2023. 
Community Benefits 
Cambuslang based housebuilder CCG Homes were procured by the council to deliver the
project and due to its scale resulted in a significant number of community benefits being
delivered. This included: 
• Establishment of 18 work placements for local people
• Utilisation of six existing apprenticeships providing additional experience for them
• Four apprenticeship completions during course of construction 
• Nine Construction Curriculum Support sessions delivered at local schools and
colleges and four SME Engagement events and workshops held. 
In addition, a £50,000 community endowment fund was created following agreement
between CCG and the council to maximise local impact of project. Consultation with tenants
in the new council homes and existing neighbourhood planning groups was held, with the
fund allocated in line with their preferences. This includes: 
• £14,000 directed to the established ‘Our Place, Our Plan’ participatory budgeting
activity, allowing local community groups to access funding for specific projects and
activities.
• £5,000 donated to the West Whitlawburn Housing Co-operative led food pantry, to
help them continue to provide free fruit, vegetables, and other provisions within the
community. 
• £1,000 donation to each of St Anthony’s and Loch Primary Schools.
• £1,000 has been allocated to the organisers of Cambuslang Summerfest, an
annual event which can be enjoyed by the wider community. 
38

Page 39

Project 2: St Joseph’s, Blantyre 
Overview
Comprising of 45 new homes, this site is adjacent to the new Blantyre care facility and was
completed in October 2022 by Cambuslang based Cruden Homes. Alongside 25
mainstream houses and flats, the site contains 20 technology enabled homes equipped
with state of the art telecare systems to help those with additional support needs.   
Community Benefits
As a result of the new homes being part of the new care facility project, significant
community benefits were delivered. This included: 
• Three new apprenticeships for local people in heating engineering and plumbing
• One new locally based labourer and one new cleaner employed
• Attendance at job fairs in East Kilbride and Hamilton
• Six South Lanarkshire based SME’s utilised as sub-contractors.   
In addition, a community grant of £5,000 was awarded to five community organisations,
with £1,000 each provided to Blantyre Community Group, Blantyre Miners Group, Terminal
One Youth Club, Regen:FX and Blantyre Soccer Academy. 
39

Page 40

Project 3: Newton Farm Primary School Extension, Cambuslang 
Overview
Completed in August 2022 the extension to the existing primary school comprised of eight
classrooms to accommodate up to a further 222 primary school pupils from the local
catchment area. The project cost a total of £4.3million, with South Lanarkshire Council the
lead contributor, covering £3.4million of the capital costs and remaining amount met by the
Glasgow City Region Deal.   
Community Benefits
Focus within the community benefit package for this project was to maximise training and
employment opportunities for local companies, employed as sub-contractors on the project.
Twelve of thirteen contractors utilised for the project were located within 50 miles of
Cambuslang and four of these were located within South Lanarkshire.   
Through working with contractors, the project enabled: 
• 4 work placements for local young people over the age of 16
• 1 new full time permanent construction job for a local person 
• Utilisation of 2 existing apprentices, providing additional experience for them
• Completion of 1 S/NVQ in construction for one person 
• Enrolment in a Leadership and Management training course for one person
• Enrolment in a Advanced Health and Safety Training course for one person 
Each of these benefits aim to contribute to improving employment and skills in the local
workforce whilst also providing income to contribute to the local economy. 
40

Page 41

Finance 
The Finance pillar focuses on efforts to increase flows of investment within local economies
by harnessing and recirculating the wealth that exists, as opposed to attracting capital. 
Our strategy aims to encourage and support financial growth for communities, including
building and attracting development and investment opportunities and encouraging local
spend. 
How we have supported Community Wealth Building
• CET Officer appointed to engage with credit unions across South Lanarkshire.
Engagement successful and credit unions are now part of the Financial Inclusion
Network and working on various initiatives to improve and increase awareness of
credit union services.
• South Lanarkshire Credit Union Network has been re-established and regular
meetings held to link credit union activity to CWB process.  Discussions are now
ongoing with the CU Network to look at new financial models for CU activity.
• The council, working with Scottish Communities Finance Ltd, has developed a pilot
Community Bond programme to support local organisations that are looking for
investment to realise their projects.  See Community Bond case study below. 
How it’s working in South Lanarkshire: 
Case study: Community Bond pilot programme 
South Lanarkshire Council has agreed a partnership with Scottish Communities Finance
Ltd to stimulate investment in local social and community enterprises that want to take over
buildings, undertake renewable installations or want to grow their products and services. 
This pilot programme will see the Council package up investment and support local
organisations that are looking for investment to realise their projects. It will also test the
opportunity for local business and local people to invest in Community Bonds for a financial
return, whilst making things happen locally.   
Starting in 2023 the programme includes a range of measures to stimulate local investment
whilst also encouraging organisations to use bonds to raise investment.  Included in the
range of measures are, an investor money back guarantee, buying one bond for every one
bought by a local person and buying any outstanding bonds to ensure a viable project
proceeds. 
Commenting on the programme, Councillor Robert Brown, Chair of Community and
Enterprise Committee at South Lanarkshire Council said “South Lanarkshire Council is the
first Local Authority in Scotland to invest in and test the Community Bond model, as a new
form of investment into the local economy. Under the Council’s community wealth building
approach, this pilot aims to create opportunity for the social economy, whilst retaining and
circulating money within our communities.” 
Pauline Hinchion, Managing Director, Scottish Communities Finance Ltd said, 
“We are delighted to be working the South Lanarkshire Council on a new Community Bond
pilot.  Social and community enterprises have great ambitions for their communities, but
often lack the money to realise them, so providing these organisations with direct financial
and business support whilst also encouraging citizen investors is a win-win for all the
communities of South Lanarkshire.”  
41

Page 42

Building the generative economy 
Action under this pillar seeks to develop and grow small, locally owned enterprises which
are more financially generative for the local economy - locking wealth into place. 
Our strategy outlined how we would work to support local businesses, not-for-profit
organisations and communities to safeguard and create local jobs and address post-Covid
recovery. 
How we have supported Community Wealth Building
• We have developed sector specific strategies and programmes - Food, Tourism and
Social Enterprise Strategies completed and in place. Specific business support
initiatives have taken place to support key sectors including Build Lanarkshire - a
construction accelerator programme, and women in business pilot programme
delivered with partners. 
• The scope of business support grants has been widened to include funding for low
carbon, energy efficiency projects.
• Small business support grant pilot introduced 2022 to assist micro and small
businesses implement projects to help them grow. This has been successful and
well received by businesses and will therefore continue as a business support offer. 
• A new business start up grant, for businesses which have not yet started trading and
therefore ineligible for existing support, was also trialled and this was implemented
through Business Gateway contractor.
• Business Growth Grant was delivered throughout the year committing around £1.3M
of funding to local businesses. This fund is being replaced with a new grant fund
focussing on creating jobs and implementing net zero activity using UK Shared
Prosperity Funding throughout 2023-24 and 2024-25.
• A new volunteering strategy for the Community Planning Partnership was approved
and launched.
• A Social Enterprise Strategy was developed and approved.  (See South Lanarkshire
Social Economy case study below) and the implementation will be supported by a
dedicated SE officer. 
How it’s working in South Lanarkshire: 
Case study: supporting CWB though the Place Based Investment Funding (PBIP) 
The projects below illustrate the progress and pipeline of projects supporting CWB though
the Place Based Investment Funding (PBIP). 
Carnwath Community Council - Business and Community Hub 
Carnwath Community Council are completing a 3 - phase Capital project to provide locally
based business and community support Hub in Carnwath village centre. This is a rural
community with limited local assets and travel issues to other local towns. 
Phase 1 - To support this the community council purchased the VDL site at 143 main street
with funding of £323k from PBIP, included in the cost was demolitions and remediation.
This has been completed. 
Phase 2 - The group then applied to PBIP for £25k funding to purchase 84 Main Street
including funds to refurbish the property. The purchase has been completed and
refurbishment ongoing. The aim is for the site to be used as a charity shop to generate
income to support the proposed Hub’s operational costs. 
42

Page 43

Phase 3 - The Community council have subsequently raised approximately £734k of
funding from multiple sources to build a new Community and Business Hub on the
purchased site at 143 Main street. The combination of the 2 sites will provide a revenue
stream to assist in the operating of the community and business Hub whilst providing a
valuable service in a rural location to residents of limited means. 
PBIP funding £347K Project value £1,080k 
Bothwell Futures – Bothwell Business and Community Hub 
Bothwell Futures are in the process of redeveloping and extending Bothwell Library as a
business and community hub. It is a 3-phase project. 
Phase 1 – They have purchased Bothwell Library via an asset transfer, supported by PBIP
to the value of £50k. The asset transfer is complete. 
Phase 2 - They have completed a £400k refurbishment partially funded by £100k of PBIP,
to repurpose it as a business and community hub.  The existing building refurbishment is
complete, and the centre currently has 2 tenants full time in the business offices providing
an income in rentals to support the community activities. Included in the costs plan is a
development officer working in the centre to deliver support to the local community. 
Phase 3 – Planning is underway for the extension to the existing building providing
additional office and community space to let.  Currently funding is being raised for this
element. 
PBIP value £150k  Project value £450k (excluding phase 3) 
East Kilbride United – Kirktonholme Pavillion 
East Kilbride United have embarked on a 3-phase plan to develop their Kirktonholme site,
creating a more disabled friendly pavilion and sports areas to support local groups and
widen their use. 
Phase 1 - was a feasibility study for £10k funded by PBIP used to engage with local groups
and organisations to gauge their interest in the project. this has been completed and
support for the work is overwhelming. 
Phase 2 - is a refurbishment of the entrances, changing facilities and exits to the sports field
funded by PBIP totalling 180k. this is currently under construction and going to plan. 
Phase 3 - is a resurfacing of the parks with artificial turf to allow greater use by all including
disabled users. This has been supported by the SFA, Sport Scotland, SLC Community
Benefit Fund and SLC PBIP providing £300k with a project value of £875k. 
The combination of these works will open up the facility to a number of additional
organisations who otherwise are not able to take part in social sports activities. The new
playing surface will provide a safer environment to use in all conditions increasing the
frequency of use. 
PBIP value £490K   Project value £1,065k 
Lesmahagow – Community and Business Hub 
43

Page 44

This project is to refurbish a 3-storey retail unit in the town centre of Lesmahagow that has
closed down, creating a business space on the ground floor and 2 affordable flats on the
1st and 2nd floors to generate income to support the Hub. The building is owned by the
group. 
This is a multi-phase project. 
Phase 1 - is the design and development of the project to RIBA stage 4 funded by PBIP to
the value of £55k which is currently being worked up and will be completed by the end of
July 2023.  
Phase 2 - is the refurbishment of the facility and flats with a combination of several different
funds totalling £726k PBIP contribution £100k. 
Once open it will provide office and meeting space for local individuals and organisations
supported by the income form the flats above. 
PBIP Value £155k Project value £781k 
Biggar Youth Project – Facility Refurbishment 
The Biggar youth project is based in one of the old Auction mart sheds and supports school
children during the day and groups and organisations at night. As a rural High School, most
students attending Biggar are bussed to school from the surrounding area and as such this
facility provides a calming and relaxing space away from school during lunch or free
periods. 
The building itself is over 100 years old and is in poor condition. Historically it was a cattle
and sheep pen and was designed a such.  It is poorly insulated, very expensive to heat,
and these associated costs put a strain on the facilities’ resources. The building is owned
by the group. The planned works are in 2 phases.
Phase 1 – to design and develop the project to RIBA stage 4 at a value supported by
funding to the value of £85k from PBIP. 
Phase 2- a combination of funds including PBIP to the value of £846k to support the
redevelopment and insulation of the site including replacement windows, doors and
insulation in the roof space, combined with a new boiler to create a more energy efficient
space improving the sites green credentials. Making it more cost effective to run and
ensuring its future.  PBIP contribution £300k. 
PBIP value £385k Project Value £931k. 
Case study: South Lanarkshire Social Economy Strategy 
A new strategy to ensure South Lanarkshire’s social enterprise continue to thrive and grow
over the next 5 years has been published by South Lanarkshire Council. 
The strategy has been developed around a shared vision to cultivate a vibrant, and growing
social enterprise sector in South Lanarkshire which creates social and environmental
benefits for all. 
South Lanarkshire Council, working with Voluntary Action South Lanarkshire (VASLan) co-
produced its first dedicated strategy for South Lanarkshire following consultation with the
sector and wider stakeholders. The strategy represents a next step in the journey to shape
44

Page 45

South Lanarkshire’s agenda for social enterprise, building upon the excellent work which is
already taking place. 
Concentrating on 3 priorities, as set out in the Scottish Government’s 10 Year Social
Enterprise Strategy, South Lanarkshire will focus on: 
• Stimulating the social economy - Working with public, private and third sector
partners we will generate awareness and greater understanding of the social
economy and encourage start up social enterprises and growth here in South
Lanarkshire. 
• Developing stronger organisations - We will target capacity building and the wider
business support offer to social enterprises, so that organisations can access the
resources, knowledge and support needed and achieve greater potential. 
• Realising market opportunities - The SESG partnership ambition is to increase the
number and range of social enterprises directly involved in selling to consumers, the
public and private sector, and to increase supply chain opportunities in the delivery
of local products and services. 
Social enterprises are active across all sectors of the economy. Here in South Lanarkshire,
the latest 2021 Census captured 177 organisations,  and shows the largest fields of activity
for social enterprises in Health and Social Care (16%), Early Learning and Childcare (16%)
and Arts and Creative Industries (15%). Four out of ten social enterprises trade locally,
whether in their local community (25%) or within the local authority area (15%). A significant
number of South Lanarkshire social enterprises have a wider reach, either to neighbouring
local authority areas (35%) or Scotland-wide (25%). 
Key facts from the South Lanarkshire census figures include: 
• 75% led by women
• 78% sell direct to consumers
• 26% located in rural South Lanarkshire
• £35m GVA added to South Lanarkshire economy
• 1,280 Full Time Equivalent employees
• 92% pay at least the Real Living Wage to all employees
• 20% won a public contract in the last 12 months
• £64m total annual income of South Lanarkshire Social Enterprises 
The Strategy has been developed with the social enterprise sector and wider partners and
stakeholders. Together, over the lifetime of the Strategy, we will work collectively to deliver
key actions to boost the South Lanarkshire Social Economy and deliver on our community
wealth building priorities. 
To kick start the Strategy we have delivered a bespoke business Accelerator programme
with 15 South Lanarkshire Social Enterprise and aim to roll out this year to a further 30
businesses. £75,000 has also been made available as a fund to help organisations income
generate and support consortia development. 
45

Page 46

Conclusion 
This annual report has highlighted our progress over the second year of Community Wealth
Building.  We have strengthened the links between anchor organisations in South
Lanarkshire through the work of the CWB Commission and we have continued to focus our
combined energies, skills and resources onto our Community Wealth Building ambitions.   
We continue to be inspired by examples of what CWB can achieve in the UK and abroad,
and we are delighted to be active participants in the growing CWB movement within
Scotland. 
Our strategy looks to achieve results across a five-year period as a starting point.  We will
continue to refresh our annual action plan in the light of what we have achieved so far.  We
will extend the reach and scope of our actions by working together – partners, stakeholders
and communities – to generate ideas, pool resources and harness our collective energy to
bring about lasting change.   
Our ambition, as we set out in our strategy, is to develop a resilient, inclusive local
economy, with more local employment and a more diverse business base.  Moving into the
third year of our strategy, we will build on the strong foundations we have established so
far.  Over the coming year we will take co-ordinated action across the five pillars of CWB to
develop a fairer, more inclusive economy that works for the people and businesses of
South Lanarkshire. 
Further information 
To find out more, visit Community Wealth Building - South Lanarkshire Council 
46

Page 47

Report 
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources) 
Subject: Spatial Planning and Community Wealth Building 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the Community Wealth Building Commission of spatial planning policy
direction on Community Wealth Building (CWB) as set out in National Planning
Framework 4 (NPF4)
 summarise the process involved in the preparation of the Council’s next Local
Development Plan and the key issues the plan will address in terms of
Community Wealth Building. 
2. Recommendation(s)
2.1. The Community Wealth Building Commission is asked to approve the following
recommendation(s):- 
(1) note the adoption of National Planning Framework 4 by the Scottish
Government and the implications for decision making in relation to planning
matters
(2) note the process involved in the preparation of the Council’s next Local
Development Plan and the key issues the plan will address in terms of
Community Wealth Building 
3. Background
3.1. The Planning (Scotland) Act 2019, which received Royal Assent in July 2019, sets
out the legislative response to the transformation of the planning system the Scottish
Government has been developing.  This includes the introduction of a statutory
requirement for the Scottish Government to prepare and adopt a new National
Planning Framework which, unlike previous versions, will form part of the
development plan alongside the Council’s own Local Development Plan.  This
means all planning decisions, including the preparation of Local Development Plans
and the determination of planning applications, have to accord with NPF4.   
In addition, the Act sets out the legislative requirements for the preparation of a new
style of Local Development Plan.  This report focuses on the issues in relation to
CWB. 
4. National Planning Framework 4
4.1. NPF4 is the Scottish Government’s National Spatial Strategy for Scotland to 2045.  It
seeks to support the role the planning system has in achieving the target of net zero
emissions by 2045; supporting nature restoration and recovery; tackling underlying
disadvantage and poor health issues; and supporting the principles of local living by
improving access to local services, learning, work and leisure. 
5
47

Page 48

The Strategy is underpinned by the principle of a Just Transition and making sure
the needs and aspirations of local communities are addressed. 
4.2. The Strategy includes 33 policies on separate topics for the development and use of
land which are to be applied in the preparation of local development plans and for
determining planning applications.  For the first time in spatial planning context, CWB
has been given distinct policy direction in recognition of the impact the delivery of the
overarching principles can have on the quality of a place and in tackling inequality. 
4.3. NPF4 explains that the overall policy intent, in relation to CWB, is to encourage,
promote and facilitate a new strategic approach to economic development that also
provides a practical model for building a wellbeing economy at local, regional and
national levels.  Outcomes include the delivery of local economic development that
focuses on the community and place benefits in order to support local employment
and supply chains. 
In addition, the policy is intended to support community ownership and the
management of buildings and land.  Other key policies that are identified as having a
close connection to CWB are listed as brownfield and vacant/derelict land; local
living and 20 minute neighbourhoods; and business and industry. 
4.4. Local Development Plans (LDPs) should be aligned with the strategy for CWB for the
area.  The plans are required to address CWB priorities; identify community assets;
set out opportunities to tackle economic disadvantage and inequality; and seek to
provide benefits for local communities. 
4.5. When it comes to determining planning applications, proposals which contribute to
local or regional CWB strategies and are consistent with local economic priorities are
to be supported in principle.  Examples of what this may involve include:- 
 improving community resilience and reducing inequalities
 increasing spending within communities
 ensuring the use of local supply chains and services
 local job creation
 supporting community led proposals, including the creation of new local firms
and enabling community led ownership of buildings and assets 
In addition, proposals linked to community ownership and management of land are to
be supported. 
5. Lanarkshire Local Development Plan 3
5.1. The Council has a statutory duty to prepare a Local Development Plan for all parts of
its area.  The process for preparing LDPs and their format and content is set out in
regulations and guidance that was published in May 2023.  One key matter to note is
that the new style LDP will have a 10 year lifetime instead of 5 years previously.  The
current LDP2 was adopted in April 2021 and there is no policy reference to CWB. 
5.2. At its meeting on 8 August 2023, the Planning Committee gave approval for officers
to start preparation of a third Local Development Plan (SLLDP3) for South
Lanarkshire.  LDP3 will have to take account of NPF4 (the issues in 4.4 above are
relevant) and the Council’s Community Plan.  It will be a corporate document
drawing together the objectives of the Council Plan and other Council strategies and
plans as well as of those of its partners and other stakeholders. 
48

Page 49

The LDP will include a Delivery Programme which will set out how the Council will
implement the plan, including a list of actions required to deliver the policies and
proposals and the timescales involved. 
5.3. The plan will be place-based and presented as a series of maps, site briefs and
masterplans for individual sites and localities.  The plan should also be people-
centred so that it meets the needs and aspirations of people and communities.
Extensive engagement is to be carried out with stakeholders, key agencies and
partners and local communities so that the plan is prepared collaboratively taking
into account a diverse range of views. 
5.4. The Act has introduced a new requirement to prepare an evidence report at the start
of the plan-making process.  The evidence will be used to inform what to plan for
before the Proposed Plan looks at where new development should take place.  The
evidence to be gathered includes a wide range of quantitative data from a national to
a local level.  It also involves local, regional and national strategies and policy
priorities that will have an impact on the direction of the LDP. Internal and external
partners will provide valuable input. 
The evidence report is also to be informed by the views of those affected by the plan
and involved in its delivery and therefore, extensive early engagement will be carried
out with key agencies, stakeholders, interest groups and local communities to ensure
evidence gathering is collaborative and transparent.  In this way, the lived experience
of those who live and work in a place will be captured.  It is expected that validation
and agreement of the evidence by stakeholders will be carried out. 
5.5. The Council is also required to invite community bodies to prepare a Local Place
Plan for their area at the start of the evidence report process.  While not mandatory,
it allows local communities to set out their aspirations to make their place better in
order to feed into the development plan process. 
5.6. The newly published guidance provides advice on the information that should be
gathered and taken into consideration for each of the 33 policy themes.  In terms of
CWB, this includes the location; use and condition of community assets; the CWB
priorities that have been identified for the area; and the identification of areas of
economic disadvantage and inequality.  Both the CWB and Social Enterprise
Strategies are relevant in this context.  Using the data gathered, the evidence report
will show how a wellbeing focussed local economy will be developed. 
6. Next Steps
6.1. NPF4 now forms part of the Council’s Development Plan alongside the currently
adopted South Lanarkshire LDP2.  As the latter contains no policy reference to
CWB, NPF4 is currently the sole source of policy direction when determining
planning applications.  This includes the criteria described in 4.5 above.  To aid
officers assess applications and give direction to landowners and developers on how
they can address these matters, local planning guidance will be produced as an
interim position until LDP3 is adopted (the current programme anticipates this being
at the end of 2027). 
6.2. In the meantime, officers will gather data and information to inform the preparation of
the LPD3 evidence report.  The type and range of this is described in 5.6 above and
officers will be approaching other Council services and members of the CWB
Commission to aid this exercise.  In addition, the planning service will engage with
our partners and stakeholders to validate our assessment of the information and
make sure the policy direction on this subject is appropriate. 
49

Page 50

6.3. As noted in 4.3 above, CWB has direct links with a number of other policy themes
that will have to be considered in a wider context.  The planning service will work
with other services within the Council and other partners and stakeholders including
NHS Lanarkshire, VASLan, further and higher education bodies and the business
sector/other anchor organisations.  This will inform the direction of LDP3 and the
preparation of the associated Delivery Programme.  Further updates to the CWB
Commission as this work evolves may be appropriate. 
7. Employee Implications
7.1. The implementation of NPF4 and the preparation of LDP3 in relation to the CWB
policy theme will have an impact on the day to day work of planning officers including
developing partnership working with other Council services and partners. 
8. Financial Implications
8.1. The costs of the preparation and production of the next Local Development Plan will
be expected to be met from existing budgets.   
9. Climate Change, Sustainability and Environmental Implications 
9.1. The theme of tackling the Global Climate Emergency, meeting the Scottish
Government’s targets for net zero emissions and the promotion of sustainable
developments are central to the spatial strategy in NPF4 and in turn, through the
preparation of the Council’s next Local Development Plan and in decision making on
planning applications. 
10. Other Implications
10.1. Since its adoption, NPF4 now forms part of the Development Plan for the Council as
Planning Authority alongside its adopted SLLDP2 and is a material consideration for
determining all planning applications.  Similarly the proposed LDP3 must take
account of NPF4 as well as the Community Plan. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. NPF4 was subject to an Equalities Impact Assessment, Child Rights and Wellbeing
and a Fairer Scotland Duty Assessment.  LDP3 will also be subject to these
assessments. 
11.2. Extensive engagement and consultation by the Council will be carried out during the
preparation of LDP3. 
David Booth
Executive Director (Community and Enterprise Resources) 
28 July 2023 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live 
Previous References
 None 
List of Background Papers
 Planning (Scotland) Act 2019
 National Planning Framework 4 approved by Scottish Parliament on 11 January 2023
50

Page 51

 Town and Country Planning (Development Planning) (Scotland) Regulations 2023
 Scottish Government Local Development planning guidance published May 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tony Finn, Planning and Building Standards Manager
Ext:  01698 455105
E-mail:tony.finn@southlanarkshire.gov.uk 
51

Page 52

52

Page 53

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Town Centres Strategic Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 Provide the Commission with an update on town centre activity 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) Note the updates provided in the report 
3. Background
3.1.  The nature of town centres across the UK is in a transitional stage.  The range of
issues involved in the challenges town centres are facing are broad and complex.
Factors such as the economic downturn, internet shopping, the growth of out of town
shopping malls, changes in retailers’ business models and consumer expectations
have resulted in a decline in footfall. 
3.2. Some of the issues are local and specific to individual towns, however, many are
issues seen across the country influenced by wider economic patterns, consumer
behaviour and corporate decisions.  Supporting town centres remains a Council
priority and officers continue to work in partnership with groups and organisations in
each town to achieve our common goals. 
3.3. The contribution town centres make to our communities cannot be overstated. Town
centres support and contribute to people’s lives across our communities whether this
is to access essential services, visiting for shopping or enjoying leisure time. Around
70% of businesses and jobs in the economy are located in town centres and they are
often the principal location for leisure and hospitality.  They retain vital social
importance as a meeting, events and performance space. 
3.4. Strategic Overview 
Across the 10 towns defined in the South Lanarkshire Local Development Plan (LDP)
there is active and ongoing engagement with the most appropriate groups in each
town.  These range from town to town and include Business Improvement Districts
(BIDs), Development Trusts, Community Councils and private property owners.   
3.5. Town Centre strategies and action plans have been prepared and approved for
Hamilton, Cambuslang, Larkhall and Blantyre with work now underway in Rutherglen.   
6
53

Page 54

Similar plans are being progressed by the communities in Lanark and Carluke along
with the master planning work by the owners of East Kilbride. In Strathaven the
Conservation Area Regeneration Scheme (CARS) has recently been completed and
as noted below, funding for a significant project in Biggar has been approved.  A
review and refresh of the Hamilton strategy is also ongoing. 
3.6. These strategies and action plans are closely aligned with the Government approach
to town centres captured in the New Future for Scotland’s Town Centres report and
action plan. 
3.7. Officers in Economic Development are working with all key stakeholders across our
towns and have commissioned 2 key pieces of work to set the direction of the
Council’s work around town centres going forward.  These will inform and align with
existing and emerging funding opportunities around town centres:-  
 Town Centre Visioning – this will set out how the Council delivers on the strategic
aims and objectives at a local level.  As noted above, while all towns have similar
challenges, the solutions are not always the same.  This work will set out how
the Council, communities and partners should deliver meaningful and
sustainable change within our town centres through a series of projects and
action plans 
 Transition to Net Zero – town centres are major contributors to pollution and
although a number of early wins have been achieved, the ways to deliver long
term meaningful and sustainable reductions are complex and not always
palatable to business or customers.  This work will set out a practical approach
to working towards net zero across our towns 
3.8. Officers in Enterprise, Planning and Community Engagement are working with
colleagues in the Improvement Service on a pilot project in Rutherglen called Shaping
Places for Wellbeing.  The project is working in 7 towns across Scotland taking a multi-
agency approach to placemaking. The initiative is still in the early stages; however, it
is hoped it will become a useful model for working with communities across South
Lanarkshire. 
4. Current Initiatives
4.1. There are a number of key areas of work underway in support of our town centres
which will inform the investment strategies and priorities going forward for the next 5
to 10 years. This work will also support and inform potential Levelling Up Fund and
other external funding bids. 
4.2. East Kilbride Town Centre Masterplan
4.2.1. As members are aware, the shopping centre has gone through a challenging period
over the last 18 to 24 months.  Along with the challenges faced around Covid-19 and
the changes in shopping patterns, the centre has been called in by the bank, who
funded the previous purchase and was subsequently put into administration on 16
November 2022. The shopping centre has vacancy rates of around 30% albeit there
are some particularly challenged sections where vacancy rates are especially high
and where the key challenges lie. The town centre is very large for its catchment and
in comparison to its nearest competitors. East Kilbride has around 230 retail units
while each of Braehead, Glasgow Fort and Silverburn have between 120 to 130 units
each. 
54

Page 55

4.2.2. With each change of ownership a new team of asset managers has taken
responsibility for the centre and given the scale and complexity of the asset, it has
taken some time for them to familiarise themselves with the asset, issues and
appropriate strategy.   
4.2.3. Throughout these challenging times, officers have kept regular contact with both the
Asset Management Team and the Local Management Team.  At all times these
discussions have been positive and the commitment by the asset managers to the
future of the town centre is without doubt. 
4.2.4. Work on the masterplan has progressed at pace since the administration was
confirmed with a draft position agreed at the end of April 2023. It is clear from this
work that taking account of the size of the centre and the level of vacancy rates, the
centre cannot sustain the amount of retail. This needs to be significantly reduced with
alternative uses considered in the most appropriate sections of the centre. The draft
reflects this position and will be presented to elected members on 7 September 2023
with a public consultation in the town centre and online running from 11 to 29
September. The masterplan will be updated to reflect the consultation process and
thereafter be submitted for planning permission in principle. The administrators have
been clear they are keen to work through this process efficiently and seek to
implement the initial phases of works in 2024/2025. 
4.3. Hamilton Town Centre Masterplan
4.3.1. Following the ongoing challenges faced by the Regent Centre and the closure of the
Marks and Spencer’s unit, the town centre requires the preparation of a masterplan
for its south eastern quarter. Vacancy rates in the town have remained consistently
below the national average; however, there are a number of key units which have
become vacant and which do not seem likely to find occupiers in the short term.  The
owners of the Regent Centre have confirmed their intention to sell their interest and
as with East Kilbride, the masterplan will set the context for public and private sector
investment over the next 5 to 10 years and will be beneficial in effecting a change of
ownership. It is proposed the following sites will be included in the masterplan work:- 
 Keith Street Car Park
 Townhead Street Car Park
 Regent Centre
 former Bairds department store
 Newcross Centre
 Police Station 
 other adjacent sites 
Consultants have been procured during May with the intention of a draft masterplan
for consultation being completed by the end of the calendar year. As with East Kilbride,
it is intended the masterplan will become a supporting document for the Local
Development Plan and inform public and private sector investment going forward. 
4.4. Place Based Investment Programme
4.4.1. The Scottish Government announced in its Programme for Government in February
2021 that it proposed to implement a place-based investment programme over the 5-
year period of the parliament. The funding is targeted at addressing some of the
challenges faced by Scotland’s places across the country. 
4.4.2. The Council was awarded £2.003m for year 1 of the programme, £1.74m for year 2
and £1.213m for each of the remaining 3 years giving total funding of £7,382m over
the 5-year programme. 
55

Page 56

The programme has just entered year 3 with the projects for years 1 and 2 complete
or on target to complete in line with the terms around financial spend of the grant
award. Two projects were carried over into year 3 due to delays in the programmes.
These are Larkhall Leisure Centre and Lanark outdoor space. 
The budget for year 3 also includes project budget carried forward from year 2 of £331k
and Shared Prosperity Funds of £390k, giving an overall budget allocation for year 3
of £1.934m. There is also an allocation of £223k from Shared Prosperity Funds for
year 4 giving a total of £1.436m in that year. 
4.4.3. The proposed allocation for year 3 reflects these funding commitments.  It is also
recommended that projects with longer delivery programmes are funded over more
than 1 year and on that basis recommendations for the atrial allocation of year four
are included.  The agreed allocation is as follows:- 
Town Project Description Allocation (£)   
Year 3 Year 4  
Budget 1,934,000 1,436,000
Larkhall Larkhall Leisure
Centre
Funding in support of
wider redevelopment
880,000 500,000
Lanark Outdoor Space Improve public space
to provide
multipurpose capacity
289,000 
Larkhall Coalyard
Housing
Support development
of social housing
scheme to deliver 18
units
190,000 260,000
East Kilbride Civic Centre/
Town Centre
Masterplan
Continuation of work
to set the future
direction of the town
centre
150,000 
Hamilton Town Centre
Masterplan 
Study to set the future
direction of the town
centre
75,000 
4.5. Town Centre Living
4.5.1. One of the keys to supporting and regenerating our town centres is increasing the
amount of town centre living. In many of our towns this is at a very low level relative to
other towns and historic rates and there is potential for some of the less commercially
viable parts of town centres to be considered for residential development. 
East Kilbride Kirktonholme
pitches
Phase 2 of
improvement of
pitches and changing
facilities
150,000 150,000
Lesmahagow Lesmahagow
Development
Trust 
Creation of
community and
business facility and
2 affordable flats in
town centre
50,000 50,000
Biggar Biggar Youth
Project
Youth club building
redevelopment to
improve green profile
in town centre 
150,000 63,000  
Total 1,934,000 1,023,000
56

Page 57

An internal officer working group has been established and its recommendations will
be presented to the appropriate committee in due course. An update on this work will
be brought to a future meeting of the Commission. 
5.  Employee Implications
5.1.  The continued development and implementation of this and future years of the PBIP
will be taken forward by officers within Enterprise and Sustainable Development
Services, in consultation with colleagues across all other Council resources and
Community Planning Partners as appropriate. 
6.  Financial Implications
6.1.  The PBIP funds from the Scottish Government, where appropriate, will be brought into
the Council’s General Services Capital Programme and will be subject to the normal
monitoring and financial processes. This will feed into the requirements of the Scottish
Government to report on progress and identify spend. 
6.2.  In respect of the size of the applications, many of the groups involved will not have the
cash flow to finance their planned project and may request advance funding to allow
their project to progress. In line with previous funds, forward funding of projects is not
available. 
7.  Climate Change, Sustainability and Environmental Implications
7.1.  The projects and initiatives identified in this report will be delivered using a range of
sustainable techniques and models, having regard to best practice and current
construction industry guidance. It is also noted that many of the projects will result in
the redevelopment of vacant buildings and land. 
8.  Other Implications
8.1.  Due to the diverse portfolio of projects, the timescales within which projects have been
developed and the capacity of groups involved assessed, however, there is a risk that
some projects may not proceed in the way envisaged and fail to meet the timescales
required. 
8.2.  Ultimately, this could result in grant not being expended in the relevant time frame and
opportunities to implement these specific projects will not be maximised. This may
result in project funding being withdrawn. To mitigate this risk, where possible, a
reserve list of projects has been compiled and will be used if needed. 
9.  Equality Impact Assessment and Consultation Arrangements
9.1.  This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no Impact Assessment
is required. 
9.2.  Consultations have been co-ordinated by Enterprise and Sustainable Development
Services with a range of other Council Services who have an ongoing role in delivering
services and initiatives in our Town Centres. This consultation and co-operation will
continue throughout the duration of the initiative. 
David Booth
Executive Director (Community and Enterprise Resources) 
27 July 2023 
57

Page 58

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres 
Previous References
 Community and Enterprise Resources Committee, 29 June 2021 – Place Based
Investment Programme
 Community and Enterprise Resources Committee, 7 December 2021 Place Based
Investment Programme (PBIP) and Town Centre Capital Fund – Update
 Community and Enterprise Resources Committee, 9 August 2022 - Town Centre and
Place Based Investment Programme Update and Funding Award 2022/2023 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Iain Ross, Economic Development Manager, Enterprise and Sustainable Development
E-mail:  Iain.ross@southlanarkshire.gov.uk
58

Page 59

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 5 September 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Draft Community Wealth Building Charter 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 present a draft Community Wealth Building Charter for South Lanarkshire,
together with recommendations and next steps 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted;
(2) that the draft CWB Charter, attached at appendix 1, be approved;
(3) that the activities, described in section 5.4, be agreed as appropriate to
launch, publicise and roll out the Charter; and
(4) that an update report on progress and impact of the Charter be brought to a
future meeting of the Commission
3. Background
3.1. The South Lanarkshire Community Wealth Building (CWB) Strategy aims to develop
resilient, inclusive local economies, with more local employment and a larger and
more diverse business base.  It sets out South Lanarkshire’s ambitions across each
of the 5 pillars of CWB covering spending, workforce, land and property, finance and
building the generative economy. 
3.2. At the meeting on 28 February 2023, the Commission considered examples of how
charters and anchor frameworks have been used in different localities to support
CWB and it was agreed that the aims of the South Lanarkshire CWB Strategy could
be advanced by the development of a local CWB Charter. 
3.3. The CWB Progress Group was tasked with developing a draft Charter and
associated recommendations.  This report presents the draft CWB Charter along
with proposals from the Progress Group relating to its communication, roll-out and
uses.
4. Commission Discussion on the Charter
4.1. At the Commission’s meeting on 28 February 2023, it was noted that there is no one-
size-fits-all charter for CWB.  Different approaches have been adopted by different
localities at different times, depending on local circumstances, opportunities, existing
networks and the level of maturity of CWB. 
4.2. A charter typically sets out high level commitments which can be couched in terms of
pledges, aspirations and model behaviours.  They are less definite and goal-oriented
than strategies or action-plans, though they may lead to co-ordinated action through
shared plans and strategies.
7
59

Page 60

4.3. Charters can be aimed at a range of different audiences from the larger anchor
organisations in a locality to local businesses, community groups and even individual
residents.  By signing or adopting a charter, the organisation or individual pledges to
do their part in supporting CWB.  Some charters are couched in terms of a contract
or deal, with signatories pledging to “do their bit” and uphold their side of the bargain. 
4.4. A charter can cover several pillars of CWB or focus exclusively on a single pillar
such as procurement or workforce.  Even within a charter which covers several
pillars, the level of detail contained within the pledges can vary from single, broad
pledges to multiple pledges in more detail. 
4.5. Charters may be used at the start of a CWB process or may be brought in to boost
engagement and awareness at a pivotal point as collaborative working is
established.  In several of the early adopters of CWB ideas in the UK, charter-type
agreements were instrumental in co-ordinating support, usually around a single topic
or pillar such as procurement or employment.  These “proof of concept” agreements
pave the way for collaborative working across a broad spectrum of activity. 
4.6. Taking these general observations into account, the Commission indicated that a
local CWB Charter should:- 
 be easy to understand and not add complexity
 be used as a vehicle to engage and aid communication
 include all the pillars of CWB and not focus on any specific aspect
 not bring in any additional pillars over and above the 5 already present in the
strategy
 be inclusive, have potential to be used by individuals and community groups as
well as anchor organisations 
The draft Charter, attached at appendix 1, has been developed to satisfy these
requirements.
5. The South Lanarkshire Charter
5.1. In line with charters elsewhere and following on from the CWB Strategy, the Charter
includes a vision statement:- 
“To work together to create a strong, resilient and inclusive local economy.” 
5.2. The Charter goes on to articulate a “charter pledge” for each of the CWB pillars.  The
pledges are drawn from statements already contained within the South Lanarkshire
CWB Strategy for each pillar, however, they have been cast in more straightforward
language and in most cases, can be supported both at an organisational/collective
level or on a personal basis. 
5.3. To illustrate the pledges, the Charter provides examples of actions which could be
taken to support them.  These are examples only and are drawn from actions
already being undertaken by anchor organisations in South Lanarkshire. 
5.4. Other points to note about the Charter include:- 
 it covers all 5 pillars
 is firmly based on the South Lanarkshire CWB Strategy and is not a copy of any
other charter
 designed to be “at a glance,” not a lengthy or complex document
60

Page 61

6. Next Steps and Recommendations
6.1. If approved, the Charter will be given appropriate branding and uploaded onto the
Council’s CWB webpage. 
6.2. There are several actions that could be taken to promote the Charter, raise awareness,
boost engagement and realise benefits from the Charter.  These could include:- 
 a launch event attended by partners
 a communications campaign, undertaken by all partners both internally and with
external stakeholders
 using the charter as part of community engagement – for example within the
Local Governance Review engagement exercise the council is undertaking
 development of web content which explains the Charter and invites local people
and organisations to support the Charter in their own way. 
7. Employee Implications
7.1. There are no direct employee implications. 
8. Financial Implications
8.1. There are no direct financial implications. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
10. Other Implications
10.1. None. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
28 July 2023 
Link(s) to Council Objectives/Values/Ambitions
• Accountable, effective and efficient 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
61

Page 62

Appendix 1 
South Lanarkshire 
CWB Charter 
62

Page 63

What is Community Wealth Building (CWB)? 
Community Wealth Building is an alternative approach to traditional economic development,
which seeks to develop resilient, inclusive local economies, with more local employment
and a larger and more diverse business base. 
Community Wealth Building reorganises local economies to be fairer and aims to reduce
wealth flowing out of our communities, towns and cities by helping local investments and
assets to generate more and better jobs for local residents and businesses. 
Anchor Institutions are organisations that are rooted in places by their purpose, histories,
land and assets, and established local relationships. Anchor Institutions, by working
together and with local communities, have a powerful role to play to build, protect and
enhance community wealth. 
By increasing community wealth, all communities improve, wellbeing improves, and people
thrive 
CWB Charter Mission Statement 
“To work together to create a strong, resilient and inclusive local economy.” 
63

Page 64

CWB Pillar Spending Workforce Land and property Finance Generative economy
Charter
pledge
I/We will support and
encourage the local
economy to grow
sustainably by making
spending decisions which
benefit local communities.
I/We will promote Fair
Work practices and act
as a role model for
others.
I/We will use or
repurpose land and
property in a socially
productive way to
generate wealth for local
citizens.
I/We will encourage and
support local financial
growth in communities by
attracting development and
investment opportunities and
encouraging local spend. 
I/We will support local
businesses, not-for -profit
organisations and
communities to safeguard
and create local jobs and
address post-Covid recovery.
Actions
which
support the
pledge 
We will
support the
pledge by
delivering
these and
related actions 
Commit to proactively
developing supply chain
and spend analysis with
detailed information about
local spend 
Undertake ongoing supplier
engagement and market
analysis and increase local
spend where possible 
Proactively engage with
other Anchor Institutions to
identify and progress joint
procurement opportunities
where possible 
Support local business and
social enterprises to bid for
public sector contracts 
Seek to maximise the
sustainable outcomes from
procurement 
Seek to maximise the
community benefits
associated with our spend
(from procurement activity)
Promote Living Wage
and Fair Work practices
locally 
Seek to boost
recruitment locally and
from priority groups
where appropriate, for
example, young people,
people with long-term
health problems, people
experiencing poverty 
Commit to providing
secure, safe
employment, addressing
gender pay imbalances
and developing
strategies for in-work
progression and
wellbeing support 
Ensure workers are
respected and have
access to trade union
membership 
Commit to undertaking an
asset review to identify
opportunities for
Community Wealth
Building 
Proactively support
communities who wish to
use or develop
underutilised assets 
Use our land and
property assets to help
develop low carbon and
renewable energy
schemes and networks to
support our climate
change and sustainable
development ambitions 
Encourage investment
and create thriving places
where people can access
goods and services on
foot or via active or public
transport 
Support and promote
progressive finance
initiatives, including local
credit unions 
Encourage staff and service
providers to shop locally and
ethically, supporting ‘Keep it
Local’ campaigns 
Building on the success of
our existing support to local
business we will continue to
develop how business
grants can help grow
communities 
Look at ways of attracting
and promote investment
opportunities in our area to
regional and national
institutions  
Proactively engage with
communities to co-produce
local services and initiatives 
Commit to involving local
SMEs, employee-owned
businesses, social
enterprises, cooperatives and
community owned enterprises
in local supply chains 
Encourage local businesses
to explore the social and
environmental impact of their
activities 
Work to increase the number
and improve the sustainability
of social enterprises in South
Lanarkshire 
Support organisations which
offer volunteering
opportunities 
64

Page 65

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 5 September 2023
Report by: Steven Sweeney - CEO, VASLan  
Subject: Third Sector and Community Wealth Building 
1. Purpose of Report
1.1. The purpose of the report is to: 
 provide an update on third sector perspectives of Community Wealth Building 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) we collaborate to raise awareness of Community Wealth Building (CWB), as
part of wider community engagement around the Local Governance Review,
including identifying with communities, opportunities for them to get involved;
and
(2) we undertake additional research to understand the gaps between what is
being bought locally by public sector partners and sold locally, to support local
Social Enterprises to realise the market opportunity
3. Background
3.1. Voluntary Action South Lanarkshire (VASLan) is the Third Sector Interface (TSI) for
South Lanarkshire.  Our vision is to see “Resilient and empowered communities
creating a stronger, fairer and more equitable South Lanarkshire with volunteers and
thriving local third sector organisations at its heart.”  Our mission is to “enable
volunteers and local third sector organisations to deliver transformational change.” 
Our values are respect, integrity, inclusiveness and commitment. 
3.2. We have 4 main functions as a TSI which are to build capacity, facilitate sector
voices, connect partners and be a source of and for third sector intelligence.  Our
current organisational strategy “Moving to Action 2022-24” has 6 strategic
objectives:- 
i. to reprioritise volunteering in South Lanarkshire for individuals, third sector
organisations and across the Community Planning Partnership
ii. to support VASLan members to proactively access the capacity building supports
available to them, as and when they require it
iii. to develop flexible, well organised, well managed third sector organisations,
which supports future third sector growth
iv. to raise the visibility of volunteering and third sector organisations, and their
active contributions to society within the general public, the third sector itself, the
private sector, across health and social care, and the Community Planning
Partnership  
8
65

Page 66

v. to accelerate partnership and collaborative working within South Lanarkshire’s
Third Sector
vi. to continue internally as a sustainable organisation with sound governance 
3.3. As part of our strategic engagement role, we represent the third sector locally and
cross-sector with Community Planning Partners.  We have sat on the Community
Wealth Building Commission since its inception and have had the opportunity to
Chair the Progress Group since January 2022.  We acknowledge that to date, this
has been very local authority driven but with an openness for cross-sector partner
contributions.  This paper is intended to outline the third sector’s relationship with
Community Wealth Building to date.
4. The Economic Footprint of the Third Sector
4.1. Neil McInroy presented to the Community Wealth Building Commission in 2022 and
noted that a good place to start regarding the third sector and Community Wealth
Building, would be the sector’s economic contribution to South Lanarkshire.  Below
are details from VASLan’s CRM system which notes by locality annual revenues,
numbers of employees and volunteering.  Perhaps this data can complement the
area profiling tool and complement locality discussions. 
Locality Annual
Revenue
No of
Employees
No of
Volunteers
Volunteer
Hours
Volunteer
Value
CamGlen £19,213,142 113 1,138 7,608 £75,319.20
Clydesdale £48,261,376 85 667 50,388 £498,841.20
East Kilbride £20,139,651 142 624 115,800 £1,146,420
Hamilton £18,812,208 263 949 88,608 £877,219.20
Total £106,426,377 603 3,378 262,404 £2,597,799.60
5. Current Context
5.1. Following on from the pandemic, costs crisis and other ongoing challenges, the
current context within the public sector and other bodies is well documented.  The
third sector, volunteers, community organisations and social enterprises, are our line
of sight for what is actually happening within our communities.  To frame progress to
date against the strategic objectives, the following data gives us a sense of the
current operating context in which volunteering predominantly sits:- 
 according to OSCR’s Sector Overview Report from July 2023, 77% of
community organisations have an income profile of £100k or less
 based on SCVO’s Third Sector Tracker Report from Winter 2022/2023, 67% of
community organisations are having challenges recruiting and retaining
volunteers, with only 89% confident they will still be operating in 12 months’
time
 many grant makers have less funding available, whilst taking pauses to review
strategic impact
 in South Lanarkshire over the past 12 months, based on our intelligence, 20
organisations have ceased to exist, along with 33 services of existing
organisations.  Predominantly lack of funding has been cited as reasons for
ceasing.  We currently have 1,603 organisations and 2,576 active third sector
services but trends and analysis suggest this will decline further over next
period
 there is a lack of capacity in the sector locally, based on intelligence specifically
around community transport, befriending, counselling, mental health supports
and broader social prescribing activities  
66

Page 67

Of course we could and should ask the question locally whether there is more that
can be done by public sector partners to support the third sector as part of a whole-
systems approach.  Equally, there is acknowledgement that this is largely a national
issue and there is a need for cross-sector joint lobbying of national stakeholders if
we are to see core investment and fair funding arrangements for the third sector. At
a local level, Social Enterprise and Community Wealth Building has been identified
as the best route of support for the sector. Community Wealth Building Commission
members are invited to consider the risks associated with the above economic
footprint being removed from South Lanarkshire communities
6. Third Sector Locality Networks
6.1. The Third Sector Locality Networks, supported by the Health & Social Care
Partnership, were formed in the summer of 2022 as part of our voice and to influence
work, to ensure the third sector is heard with regards to what matters to them, testing
local views, etc.  This replaced the pre-pandemic Locality Forums, with increased
autonomy and direction provided by lead third sector partners, as opposed to
VASLan themselves. 
Clydesdale Locality Network
(Third Sector Locality Network - Lanark - YouTube)
Third Sector Locality Network Meeting - Clydesdale 2023 - YouTube
Third Sector Locality Network Clydesdale - June 2023 - YouTube 
Lead Partners  CCI & Healthy Valleys 
East Kilbride Locality Network
(Third Sector Locality Network - East Kilbride - YouTube)
Third Sector Locality Network Meeting - East Kilbride 2023 - YouTube
Third Sector Locality Network East Kilbride - June 2023 - YouTube 
Lead Partners Connected East Kilbride 
CamGlen Locality Network
(Third Sector Locality Network - Cambuslang and Rutherglen - YouTube)
Third Sector Locality Network Meeting - Rutherglen - YouTube
Third Sector Locality Network - CamGlen - YouTube 
Lead Partners VASLan (placeholder as lead partner application still open) 
Hamilton Locality Network
Third Sector Locality Network Meeting - Blantyre at the David Livingstone
Birthplace 2023 - YouTube
Third Sector Locality Network - Hamilton - YouTube 
Lead Partners David Livingstone Trust & LAMH 
6.2. Within all these local conversations, we also asked local people what Community
Wealth Building is and how they could get involved or contribute.  The majority of
responses suggested that there is a lack of awareness of what Community Wealth
Building is, and how they can get involved.   
67

Page 68

This was consistent across all localities and identifies a clear gap and need for a
partnership approach in better engaging with our communities in 2023 around
Community Wealth Building, to increase participation at a local level. 
6.3. In Spring 2023, in response to the above point, we ran some further engagement
sessions with third sector partners to better understand how they would like VASLan
to support communities improve their understanding and participate in Community
Wealth Building. A subsequent further 2 sessions took place in partnership with NHS
Lanarkshire, exploring their new strategy development through a Community Wealth
Building lens, allowing for direct dialogue between volunteers, community
organisations, Social Enterprises, and public sector colleagues from NHS
Lanarkshire. With the development of a Community Wealth Building Charter as a
communication tool with communities, it is important we follow this up with in person
conversations. 
6.4. Therefore, it is proposed that partners collaborate on community engagement
activities to promote Community Wealth Building.  It is further proposed that the
Scottish Government/COSLA’s Local Governance Review (LGR) provides an ideal
opportunity to kickstart this piece of work and that CWB be added to a Community
Planning Partnership programme of community engagement that is scheduled to
take place across September and October to discuss shared decision-making in the
context of the LGR.
7. Social Enterprise in South Lanarkshire
7.1. Details of the Social Enterprise Strategy and Action Plan were presented to the
Community Wealth Building Commission in June 2023. The Strategy can be found
here: South Lanarkshire Social Enterprise Strategy 2023-27. Meanwhile, South
Lanarkshire Council and VASLan, in partnership, have generated some of the
following quick wins to build momentum:- 
 multi-agency South Lanarkshire Social Enterprise Steering Group (SESG)
established to provide local collective leadership
 Social Enterprise Network (SEN) to facilitate third sector voice and drive the
priorities of the membership
 South Lanarkshire Social Enterprise Census commissioned, with key statistics
shared in strategy document, further analysis of local intelligence underway with
SEN and SESG taking forward
 awareness raising and interest generating around models of democratic
finance.  SLC has committed to an initial £50k Community Bond Pilot with
Officer and SEN workshops, ongoing engagement and the gathering of
potential project ideas currently in action
 Social Enterprise Small Grants Funding Pot launched in April based on 50%
match funding, 3 grants worth £11.5k allocated to date
 Climate Confident South Lanarkshire programme of work underway as a digital
solution with wraparound support, 15 of 30 spaces taken so far
 the Social Enterprise Accelerator ran by Inspirent was a huge success, 15
Social Enterprise Leaders supported through an intensive training package of
support. Currently procuring a further 2 courses for up to 30 Social Enterprise
Leaders
 Locator App, an online directory of third sector services including Social
Enterprises, scheduled for launch in September
 SLC has funded a part-time resource hosted within VASLan to drive forward the
SEN
 South Lanarkshire’s Social Enterprise Strategy has been named as a finalist in
the Market Builder Category for the Social Enterprise Scotland Awards 2023
68

Page 69

8. Social Enterprise Network
8.1. The SEN has set out its priorities as the following:- 
 network members adopt the Voluntary Code of Practice for Social Enterprises
 building relationships with other Social Enterprises providing mutual support
 a place to share knowledge and experience
 collaborative working relationships and connection across South Lanarkshire,
pan-Lanarkshire and the wider Social Enterprise community, as well as with the
public and private sectors
 identify emerging themes
 be an advocate for funding specifically designed for Social Enterprises
 receive relevant updates and provide feedback to strategic groups
 better services and experiences
 support consultation and dialogue on the ongoing development and effective
implementation of strategies and action planning 
8.2. When reflecting on the Terms of Reference for the group at our second meeting on
19 January 2023, hosted at EK Collective, there was a desire from members for us
to be more ambitious, and for our voice to be heard in that regard. A conversation
followed with Louise McDonald OBE, Director General for Economy, where it was
acknowledged that when delivering a product or service, combined with social
impact, it is inevitably more expensive. 
Social Enterprises locally wish to participate in a competitive environment for
contracts, as they should. However, further weightings towards Social Enterprises
would be welcomed. Going one step further, with the acknowledgement of often
what is being bought and sold do not always align, a need for flexibility and
adaptation of business models for market potential need to be realised.
Encouragement for Social Enterprises to flex their model, with a fair chance of
winning contracts for products and services, whilst retaining their social value and
impact, would accelerate how we build local Community Wealth in South
Lanarkshire. 
8.3. It is proposed that we undertake some additional research to understand the gaps
between what is being bought and sold locally, to support local Social Enterprises to
realise the market opportunity. 
9. Employee Implications
9.1. There are no direct employee implications. 
10. Financial Implications
10.1. There are no direct financial implications. 
11. Climate Change, Sustainability and Environmental Implications
11.1. There are no climate change implications as a result of this report. 
12. Other Implications
12.1. None. 
13. Equality Impact Assessment and Consultation Arrangements
13.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.  
69

Page 70

Steven Sweeney
CEO, VASLan 
17 August 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Steven Sweeney
Tel:  01698 300390
E-mail:  steven.sweeney@vaslan.org.uk 
70

Page 71

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 5 September 2023
Report by: Executive Director (Finance and Corporate Resources) 
Subject: Forward Programme for Future Meetings 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the forward programme for the meetings of the Community
Wealth Building Commission
 invite members to suggest topics for inclusion in the Committee’s forward
programme
[1purpose]
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):-
[recs]
(1) that the report and the outline forward programme for the meetings of the
Commission, attached as an appendix to the report, be noted.
[1recs]
3. Background
3.1. Members of the Commission have expressed an interest in bringing forward items to
future meetings which would explore each of the 5 pillars in detail and allow
constructive discussion on how collectively to progress the CWB agenda in South
Lanarkshire. 
3.2. In a similar vein, it has been noted at previous meetings that the updates on the
action plan at Q2 and Q4 provide only an overview of progress, with brief summaries
of the actions that are being taken.  For a detailed understanding of the context,
progress and challenges under each pillar, it is necessary to look at specific topics in
detail. 
3.3. To assist in shaping the future deliberations of the Commission, an outline forward
programme is attached as an appendix to the report.  Members are invited to
consider the programme and suggest topics that they would like to see addressed at
future meetings.  
4. Employee Implications
4.1. There are no employee implications. 
5. Financial Implications
5.1. There are no financial implications. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no climate change, sustainability or environmental implications in terms of
the information contained within this report. 
9
71

Page 72

7. Other Implications 
7.1. There are no risk implications in terms of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. The report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
16 August 2023 
Link(s) to Council Values/Objectives/Ambitions
 Accountable, effective, efficient and transparent 
Previous References
None 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
72

Page 73

APPENDIX – CWB COMMISSION OUTLINE FORWARD PROGRAMME 
12 December 2023  Data Digest Report
 Neighbourhood Planning
 Action Plan Q2 Progress Report
 Forward Programme for Future Meetings
Neil
Jen
Neil
Susan/Helen   
12 March 2024  Forward Programme for Future Meetings
 Meeting Timetable 2024/2025
Susan/Helen
Susan/Helen   
Future Meetings  Employability and the Employment Pillar
 Asset Transfer
 Planning for Place and CWB
 Community Benefits within Contracts
 UN Sustainable Development Goals 
SLC
SLC
SLC
SLC
VASLan or 
Cmty Planning 
73

Page 74

74