Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Friday, 26 May 2023 
Dear Member 
Community Wealth Building Commission 
The Members listed below are requested to attend a meeting of the above Board to be held
as follows:- 
Date:  Tuesday, 06 June 2023
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
South Lanarkshire Council
Councillor Alex Allison
Councillor Robert Brown
Councillor Maureen Chalmers
Councillor Margaret Cooper
Councillor Joe Fagan (Chair)
Councillor Kirsten Robb
Councillor John Ross
Councillor Margaret B Walker
Cleland Sneddon, Chief Executive
Paul Manning, Executive Director (Finance and Corporate Resources)
Soumen Sengupta, Director, Health and Social Care 
Jann Gardner, Chief Executive, NHS Lanarkshire
Josephine Pravinkumar, Director of Public Health, NHS Lanarkshire
Hisashi Kuboyama, Development Manager, West of Scotland, Federation of Small
Businesses
Steven Sweeney, Chief Executive, VASLan
Thomas Adamson, Estates Environment Manager, University of the West of Scotland
(UWS) 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community Wealth Building Commission
held on 28 February 2023 submitted for approval as a correct record. (Copy
attached) 
5 - 12 
Item(s) for Consideration 
3 Shaping Places for Wellbeing
Report dated 10 May 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached).  Presentation by Ruth Hart,
Shaping Places for Wellbeing Project Lead, Rutherglen, Improvement
Service 
13 - 14 
4 South Lanarkshire Social Enterprise Strategy 2023 -2027
Report dated 27 April 2023 by the Executive Director (Community and
Enterprise Resources). (Copy attached) 
15 - 40 
5 Supplier Engagement
Report dated 18 May 2023 by the Executive Director (Community and
Enterprise Resources). (Copy attached) 
41 - 48 
6 Community Benefits Associated with the Council's Affordable
Housing Supply Programme
Report dated 18 May 2023 by the Executive Director (Housing and
Technical Resources). (Copy attached) 
49 - 56 
7 Community Wealth Building Scottish Government Consultation
Report dated 10 May 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
57 - 70 
8 Community Wealth Building Action Plan Q4 Update
Report dated 16 May 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
71 - 92 
9 Forward Programme for Future Meetings
Report dated 18 May 2023 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
93 - 96 
Any Other Competent Business 
10  Any Other Competent Business
Any other items of business which the Chair decides are competent. 
For further information, please contact:-
Clerk Name: Helen Calley
2

Page 3

Clerk Telephone: 07385370069
Clerk Email: helen.calley@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

COMMUNITY WEALTH BUILDING COMMISSION 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 28 February 2023 
Chair:
Councillor Joe Fagan 
Present:
South Lanarkshire Council
Councillors Alex Allison, Robert Brown, Maureen Chalmers, Margaret Cooper, Kirsten Robb,
Margaret B Walker
C Sneddon, Chief Executive; P Manning, Executive Director (Finance and Corporate Resources)
NHS Lanarkshire
J Pravinkumar, Director of Public Health; E Russell, Consultant in Public Health
University of the West of Scotland
T Adamson, Estates Environmental Manager
VASLan
S Sweeney, Chief Executive Officer 
Also Attending:
South Lanarkshire Council
Community and Enterprise Resources
S Keating, Property Development Manager
Finance and Corporate Resources
H Calley, Administration Officer; N Docherty, Administration Assistant; C Fergusson, Head of
Finance (Transactions); T Little, Head of Communications and Strategy; N Reid, Improvement and
Community Planning Manager 
Apologies:
South Lanarkshire Council
Councillor John Ross; S Sengupta, Director, Health and Social Care; G McCann, Head of
Administration and Legal Services (Finance and Corporate Resources)
Federation of Small Businesses
H Kuboyama, Development Manager, West of Scotland
NHS Lanarkshire
J Gardner, Chief Executive 
1 Declaration of Interests
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Community Wealth Building Commission held on 6 December
2022 were submitted for approval as a correct record. 
The Commission decided: that the minutes be approved as a correct record. 
3 Membership Update
A report dated 9 February 2023 by the Executive Director (Finance and Corporate Resources)
was submitted advising of a change to the membership of the Commission.
2
5

Page 6

Following a request from NHS Lanarkshire, J Pravinkumar, Director of Public Health, was added
to the membership of the Community Wealth Building Commission, in addition to the current
representation of Jann Gardner, Chief Executive, NHS Lanarkshire. 
The Chair, on behalf of the Commission, welcomed J Pravinkumar to her first meeting. 
The Commission decided: that the change in membership be noted. 
4 NHS Lanarkshire as an Anchor Organisation
A report dated 23 January 2023 by the Consultant in Public Health, NHS Lanarkshire (NHSL),
was submitted:- 
 providing an update on the work being undertaken by NHSL to harness its ambitions as an
inclusive anchor organisation
 detailing how its programme of work would be taken forward; and
 highlighting the recently developed Cost of Living Delivery Plan 
CWB was a progressive approach to economic development which aimed to retain opportunities
and wealth in communities for the benefit of the local population.  This was achieved by
harnessing the economic and social power of locally rooted organisations, often referred to as
local anchors. 
Anchor organisations were large, locally rooted organisations and included the NHS, local
authorities, colleges and universities, and private businesses with local headquarters.  As they
employed many people, spent substantial amounts of money, owned and managed land and
assets, and often delivered crucial services, they had a considerable impact on local
communities and economies. 
Anchor organisations were pivotal to CWB as a result of the scale and ways in which they
operated and significantly added to local employment, business growth, skills, incomes, health
and wellbeing.  They helped places thrive and be places where people wanted to live and where
businesses wanted to invest, setting them on a path to long term success and shared prosperity. 
As noted by the Joseph Rowntree Foundation (JRF), there were 5 areas of activity where
anchor organisations could make a difference:- 
 as an employer
 through procurement of goods
 through environment and assets
 through products and service delivery
 through corporate and civic behaviours 
The Scottish Government recently launched a Care and Wellbeing Programme which included
an anchor workstream.  The aim of the programme was to support Scotland’s health and social
care providers to become active anchor organisations which would help to mitigate against
some of the drivers of socioeconomic inequalities within their area. 
The JRF, in partnership with Leeds City Council, had developed an Anchor Progression
Framework as a tool for organisations to use to self-assess where they were against the 5
anchor pillars, the details of which were attached to the report.
6

Page 7

In the absence of a Scottish toolkit, work was undertaken in 2022 to scope out the NHSL
baseline position as an anchor organisation against each of the pillars using the JRF
Progression Framework.  Public Health Scotland was also developing a Scottish Anchor
Assessment Framework to support the national Care and Wellbeing Programme.  It was
anticipated Boards would be expected to report on this new assessment framework as part of
annual performance monitoring. 
Overall, NHSL performed well across many of the anchor pillars and there were opportunities for
it to further enhance its role and influence as an anchor, particularly with regards to targeting
opportunities and services to those who were most vulnerable and through further developing
employability, procurement and asset strategies.  A summary of the areas where NHSL had
made progress as an anchor was detailed in the report. 
NHSL aimed to capitalise on the opportunities afforded through the development of the new
healthcare strategy, Our Health Together, to intentionally “do things differently” and strengthen
anchor commitments.  Critical to this aim, was working collaboratively with other local anchors to
share learning and build on the existing strong partnerships already in place. 
An anchor workshop was being planned for spring 2023 to review the NHSL anchor baseline
assessment in light of the national programme and framework.  This would help to prioritise key
actions and performance monitoring measures going forward. 
The Consultant in Public Health, NHSL, answered members’ questions on the integrated quality
impact assessment and socioeconomic inequalities; the employment pillar and innovative
approaches with recruitment from vulnerable groups; details of co-location services in relation to
transport issues; how financial wellbeing was included for patients at acute centres; resource
capacity to harness and analyse data captured through the public health intelligence hub and
plans for some services to be accessible outside of hospitals. 
The Chief Executive Officer, VASLan, noted the issues with awareness and understanding of
CWB as well as the level of engagement with communities but hoped there would be
opportunities, at locality level or pillar-by-pillar, to raise awareness which the third sector would
support. 
The Commission decided: that the report be noted. 
E Russell left the meeting after this item of business 
5 Community Wealth Building and the Role of Charters
A report dated 18 January 2023 by the Executive Director (Finance and Corporate Resources)
was submitted providing an overview and examples of how charters had been used to support
Community Wealth Building (CWB). 
The South Lanarkshire CWB Strategy aimed to develop resilient, inclusive local economies, with
more local employment and a larger and more diverse business base.  It set out South
Lanarkshire’s ambitions across each of the 5 pillars of CWB of spending, workforce, land and
property, finance and building the generative economy. 
The report included examples of how charters and anchor frameworks had been used in
different localities to support CWB and suggested ways in which the CWB Strategy might be
supported by means of a Charter for South Lanarkshire.
7

Page 8

Although there were limited examples of the use of Charters in Scotland, in October 2020, the
CWB Commission in Ayrshire launched the Ayrshire CWB Anchor Charter, which committed
local and regional anchor institutions to a range of pledges across the 5 pillars of CWB and a ‘6th
pillar’ of climate action.  The 2021 annual report indicated that 7 organisations had signed up to
the Charter.  The pledges were relatively high-level statements and were detailed in the report
with the full Ayrshire Charter attached as Appendix 1. 
In April 2022, a Fife Anchor Charter was approved which was essentially the same as the
Ayrshire Charter, although it lacked the additional 6th pillar on climate action.  In Fife, the
partners had taken the approach of agreeing the charter first (as part of the Fife Recovery and
Renewal Plan 2021 to 2024) and then looked to develop a delivery plan covering all 5 pillars of
CWB.  The Fife Charter was attached as Appendix 2 to the report. 
A different approach was taken by Stirling Council, which had adopted a charter that focused on
“the progressive procurement of goods and services”, the first of the 5 pillars of CWB.  Its
charter included a pledge to CWB principles and a number of actions similar to those already in
the South Lanarkshire Action Plan.  The Stirling Procurement Charter was attached as Appendix
3 to the report. 
The Leeds Anchor Network drew membership from over a dozen organisations, including NHS
Trusts, universities and colleges, Leeds City Council, Yorkshire Water, British Library and
Northern Gas Networks, which formed a network and used a Progression Framework,
developed with support from the JRF and others, to set out the commitments and behaviours
expected of an anchor organisation.  Although not a charter, the Progression Framework served
a similar function and examples were attached as Appendix 4 to the report. 
Other examples were detailed in the report, including a Health Anchors Learning Network and
the Stevenage Charter. 
The examples illustrated that there was no one-size-fits-all charter for CWB.  Different
approaches had been adopted by different localities at different times, depending on local
circumstances, opportunities, existing networks and the level of maturity of CWB.   
It was proposed that the CWB Progress Group be tasked with assessing the benefits of
adopting a charter and provide a report, with recommendations, to a future meeting of the
Commission.  Consideration would also be given to developing a Charter which was
Lanarkshire-wide and involved other anchor organisations. 
Work would also be done to establish how other areas, including North Ayrshire and Preston,
had communicated and engaged with their communities on CWB. 
The Commission decided: 
(1) that the report be noted; 
(2) that the Progress Group be tasked with evaluating the potential benefits of developing a
charter for South Lanarkshire; and 
(3) that a further report with recommendations be brought to a future meeting of the
Commission. 
6 Area Profiling Tool for South Lanarkshire
A report dated 18 January 2023 by the Executive Director (Finance and Corporate Resources)
was submitted providing the Commission with an overview of an online tool which provided
statistical information on small areas and communities within South Lanarkshire.
8

Page 9

The Commission had been provided with statistical information on the economic and social
context within South Lanarkshire at previous meetings.  When the data digest was presented, a
commitment was given to bring regular updates to the Commission to inform decision-making
and provide appropriate context for Community Wealth Building (CWB) work in South
Lanarkshire. 
The Council’s website included an Area Profiling Tool, developed by the Council, which provided
data to aid understanding of the social and economic situation in South Lanarkshire. 
The Tool enabled thematic reports to be generated about areas within South Lanarkshire, which
were defined by the user, with any combination of data-zones selected to form a user-defined
area for analysis.  The Tool had 2 main features, the ability for users to select an area of interest
or to define their own “custom” area, with the ability to select what sort of information they would
like to see about the area. 
The Tool stored statistics about individual data-zones which were the lowest level to which
analysis could be provided.  The Tool had a number of pre-defined geographical areas built in
and once an area was selected, users chose a statistical theme, which reflected the outcomes in
the Council Plan, Connect.   
Appendix 1 to the report provided a sample report which combined all themes using the
Hamilton Area Committee area.   
The Tool would continue to be updated with new data as it became available and as the Council
rolled out new technologies for data management, the Tool would be reviewed to assess options
for migrating it to an alternative platform, possibly within a dashboard-style Tool which provided
a wider range of intelligence about the social and economic situation in South Lanarkshire. 
The Commission would continue to receive an annual refresh of the data digest previously
provided, the next iteration being available in summer 2023. 
Officers gave an undertaking to send members a link to the Tool and to respond to a member’s
question regarding using it in relation to 20-minute neighbourhoods.   
Although members acknowledged the benefits of the Tool, it was noted that it would not provide
data on groups of people, for example, older people or trends.  Also, data would not identify who
needed help and where, for example, rural areas. 
The Commission decided: that the report be noted. 
7 Community Wealth Building Scottish Government Consultation
A report dated 3 February 2023 by the Executive Director (Finance and Corporate Resources)
was submitted advising of a consultation on Community Wealth Building, launched by the
Scottish Government and proposing a joint response be developed by the Progress Group, on
behalf of the Commission, with the final submission to be tabled at the next meeting of the
Commission. 
In the Programme for Government 2022/2023, the Scottish Government indicated that it would
hold a consultation on CWB legislation.  The consultation was launched on 31 January 2023
and sought views on what was required to accelerate and deepen CWB in Scotland.  The
closing date for responses to the consultation was 25 April 2023.
9

Page 10

The consultation paper, Building Community Wealth in Scotland, set out a vision for CWB as
part of a strategic approach to the development of a wellbeing economy.  The commitment to
the introduction of legislation on CWB in the current Parliamentary session was seen as part of
a strategic approach to creating a wellbeing economy, empowering communities and supporting
local and regional economic development. 
Other activity to support the agenda included the upcoming Land Reform Bill, the commitment to
a series of Just Transition Plans, the National Planning Framework 4, the Refreshed Fair Work
Action Plan and the review of the Community Empowerment Act. 
The consultation paper had 3 parts.  Part 1 described what CWB was, provided an overview of
CWB activity in Scotland and outlined the background to and ambitions for CWB legislation; part
2 set out proposals for a duty to advance CWB and explored each of the pillars in turn, looking
at what might be required to advance CWB in Scotland, with suggestions collated from
stakeholder engagement so far; and part 3 provided details on how to respond to the
consultation and next steps. 
The consultation paper was attached as Appendix 1 and the questions set were attached as
Appendix 2 to the report. 
The consultation included a proposal to implement a duty to advance CWB giving 3 options,
which were detailed in the report.  The consultation also included the question “are there ways in
which the law could be changed to advance this pillar?” for each of the 5 pillars of CWB.  To
assist respondents, the consultation provided examples of suggestions made by stakeholders in
the course of engagement on CWB to date, as detailed in the report. 
It was proposed that the CWB Progress Group develops a draft response which would be
circulated to Commission members for approval prior to its submission by the closing date. 
The Commission decided: 
(1) that the report be noted; 
(2) that the Progress Group be tasked with developing a draft response on behalf of the CWB
Commission; 
(3) that the draft response, once approved, be submitted to the Scottish Government by the
closing date of 25 April 2023; and 
(4) that the final submission be formally tabled at the next meeting of the Commission on 6
June 2023. 
8 Meeting Timetable 2023/2024
A report dated 9 February 2023 by the Executive Director (Finance and Corporate Resources)
was submitted proposing that future dates of the Community Wealth Building Commission take
place at 2pm on the following dates:- 
 Tuesday 6 June 2023
 Tuesday 5 September 2023
 Tuesday 12 December 2023
 Tuesday 12 March 2024 
The Commission decided: that future meetings of the Commission be held on the
dates detailed above.
10

Page 11

9 Forward Programme for Future Meetings
A report dated 9 February 2023 by the Executive Director (Finance and Corporate Resources)
was submitted advising of the forward programme for meetings of the Commission and inviting
members to suggest topics for inclusion in the Commission’s forward programme. 
The Commission decided: that the report be noted. 
10 Any Other Competent Business
There were no other items of competent business. 
11

Page 12

12

Page 13

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 6 June 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Shaping Places for Wellbeing 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 introduce the Shaping Places for Wellbeing approach as an example of place-
based approaches to Community Wealth Building (CWB) and wellbeing 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted.
3. Background
3.1. At the Commission meeting on 6 September 2022, there was a wide-ranging
discussion of CWB topics with the Scottish Government CWB Team and Neil
McInroy from the Centre for Local Economic Strategies (CLES) in attendance.  It
was agreed that further discussion sessions at the Commission to explore CWB
concepts and applications would be beneficial to implementation of the approach in
South Lanarkshire. 
3.2. Following on from this meeting, a paper was brought to the Commission on 28
February 2023 discussing the use of Charters in CWB and work is now underway to
look at a potential charter for South Lanarkshire. 
3.3. This report introduces the Local Government Improvement Service (LGIS)
presentation on Shaping Places for Wellbeing to provide a starting point for a
consideration of place-based approaches and the implementation of CWB.
4. Shaping Places for Wellbeing
4.1. Shaping Places for Wellbeing is a 3 year programme, running until March 2024,
which is being delivered by Public Health Scotland (PHS) and LGIS jointly, with local
authorities and NHS Boards and has the aim of addressing health inequalities.  The
programme attempts to stop problems developing through the use of an upstream
approach to address the social determinants of health. 
4.2. The programme recognises that much of the ability to make improvements in areas
sits with local partners, including councils and it seeks to harness this to develop
new approaches that improve health and wellbeing outcomes and from which
learning can be drawn and used more widely across Scotland. 
4.3. In South Lanarkshire, the Rutherglen area has been selected as a test site due to
the level of health inequalities within the town, the strong local infrastructure and the
work being complementary and adding additionality to the range of activity which
was already under way.
3
13

Page 14

5. Links to the CWB Agenda
5.1. From a spatial planning perspective, one of the objectives of the recent review of the
planning system was to strengthen links between spatial and community planning.
The planning system should support development that reduces health inequalities,
particularly in places that are experiencing the most disadvantaged.   
5.2. Ways in which this can be achieved include the creation of 20-minute
neighbourhoods; prioritising the re-use of vacant and derelict land and encouraging
measures to facilitate active travel, enhance biodiversity, open space/play/recreation
and improve air quality.  All of these themes can combine to improve health and
wellbeing through the creation of high quality, climate resilient places.  The CWB
strategy and action plan include a number of actions which address these topics.
6. Conclusions and Next Steps
6.1. The Commission is asked to note the content of this report and the presentation by
the Local Government Improvement Service. 
7. Employee Implications
7.1. There are no direct employee implications. 
8. Financial Implications
8.1. There are no direct financial implications. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no climate change implications as a result of this report. 
10. Other Implications
10.1. None. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
10 May 2023 
Link(s) to Council Objectives/Values/Ambitions
• Accountable, effective, efficient and transparent 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk
14

Page 15

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 6 June 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: South Lanarkshire Social Enterprise Strategy 2023 to
2027 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on progress on the development of the South Lanarkshire Social
Enterprise Strategy, as attached at Appendix 1 to the report 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) that content of the South Lanarkshire Social Enterprise Strategy 2023 to 2027
be noted; and
(2) that comment be provided on the report. 
3. Background
3.1. At the first meeting of the Community Wealth Building Commission on 31 August 2021,
members approved an action plan to accompany the South Lanarkshire Community
Wealth Building Strategy 2022. This new Social Enterprise (SE) Strategy is one of the
high-level outcomes of the Community Wealth Building Action plan, alongside the
development of a Social Enterprise Steering Group.
3.2. The SE Strategy sets out the Council’s commitment to increase the number of social
enterprise and improve the sustainability of the Sector in South Lanarkshire. We have
received constructive comments that have informed the Strategy, attached as
Appendix 1. 
3.3. The priorities and draft narrative have been shared with and informed by partners, and
stakeholders, within and out with the Council, as part of a wider consultation process.
A list of consultees is attached at Appendix 2. 
4. South Lanarkshire Social Enterprise Strategy 2023 to 2027
4.1. The SE Strategy is a new strategy for South Lanarkshire, that is in keeping with the
Scottish Government’s priorities for the sector, and vision of a fair society and inclusive
economy, as set out in the ‘Scotland’s Social Enterprise Strategy 2016 to 2026’. The
3 high level priorities are:-  
4
15

Page 16

1. Stimulating Social Enterprise
2. Developing Stronger Organisations
3. Realising Market Opportunity 
4.2. The Strategy provides an ongoing framework for dialogue about, and influence upon,
capacity building and business support practices as they affect – and are informed by
enterprising third sector organisations and specifically social enterprises. And will take
an evidence-based approach to inform detailed actions and activity going forward,
using data from the 2021 National Social Enterprise Census. 
4.3. Contained within the Strategy, ‘Our Vision’ is:- 
 To cultivate a vibrant and growing social enterprise sector in South
Lanarkshire, which creates social and environmental benefits for all. 
4.4. In summary, the strategy includes the following sections:- 
 Foreword – This section sets out the council’s commitment and investment into
growing and sustaining a vibrant social enterprise sector and the contribution to
our local economy that the sector delivers, adding value to the existing ecosystem
of local and national support and recognising the importance of collaboration and
partnership working to effectively deliver on this strategy.
 Introduction – This short section highlights and promotes the partners ambitions
to deliver on key actions under the key priorities of stimulating social enterprise,
developing stronger organisations, and realising market opportunity.
 The Strategy in Context – The draft Social Enterprise Strategy is shaped by both
the Strategic Policy Framework and current priorities. In developing the Strategy,
officers have taken the opportunity to ensure that objectives remain aligned with
policy and strategy updates moving forward to take cognisance of the existing
ecosystem of support.
 Our Priorities –We set out our objectives under the key priorities of stimulating
social enterprise, developing stronger organisations, and realising market
opportunity to shape our ambitions for the future. Make a series of bold ‘We Will’
statements to confirm our commitment to strengthen and target our existing
business offering, invest in the sector, expand the capability of local social
enterprises, and strengthen social capital.
 Delivering on our Ambitions:  The key actions and areas of activity are set out in
the Strategy which defines our priorities, commitment, outcomes, and how we
will measure success. We have developed the strategy in partnership with the
Sector and key stakeholders. The Social Enterprise Steering group will set out
specific actions as well as leading on some aspects of delivery.   
4.5. Officers have developed this strategy as part of the Council’s suite of strategies and
plans, namely the Council Plan ‘Connect’, the Community Plan, the Community
Wealth Building Strategy, the Sustainable Development and Climate Change Strategy
and the Tourism Strategy, all of which are inherently linked and informed by our
communities. 
4.6. This Strategy is a key action included in the South Lanarkshire Community Wealth
Building Action Plan, under the pillar ‘Building the Generative Economy’ which
commits to:- 
 the development of a Social Enterprise Strategy and Action Plan
 formation of a steering group
16

Page 17

 recruitment of a dedicated Social Enterprise Officer 
4.7. A South Lanarkshire Social Economy Steering group, established in August 2022, is
the leadership group for developing and implementing the SE Strategy and associated
action plan. Its core role is to inform, influence and review progress against the key
priorities and actions through a partnership approach. Members on this group currently
includes: SLC Procurement, Voluntary Action South Lanarkshire (VASLan), South
Lanarkshire Third Sector Chief Officers group (COG), Third Sector rural
representation, Inspirent, Business Gateway Lanarkshire, Social Enterprise Scotland,
SLC Procurement and SLC Community and Enterprise Resources. 
5. Employee Implications
5.1. An Economic Development Officer (Social Economy) has been recruited to finalise
and assist with delivering this strategy’s action plan and measure its success going
forward.   
6. Financial Implications
6.1. The funds required to finalise the strategy and the action plan are included in our
revenue budgets for the lifespan of the strategy.  External funds will also be sought
from UK Government and Scottish Government funding streams to  maximising the
impacts of Social Enterprise Strategy. 
7. Climate Change, Sustainability and Environmental Implications
7.1. The SE Strategy and associated action plan referred to in this report will be delivered
having regard to best practice both in terms of how we deliver those actions and our
commitment to net zero. 
8. Other Implications
8.1. None. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. An Equality Impact Assessment has been undertaken and signed off for this new
strategy. 
David Booth 
Executive Director (Community and Enterprise Resources) 
27 April 2023 
Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
17

Page 18

Outcomes
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities 
Previous References
 None 
List of Background Papers
 South Lanarkshire Economic Strategy 2022 to 2027
 South Lanarkshire Community Wealth Building Strategy 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Yvonne McBride, Economic Development Officer
Mobile: 07795453498
E-mail:-  yvonne.mcbride@southlanarkshire.gov.uk
18

Page 19

flourishing | green | dynamic | equitable
Strategy
2023-2027Social
EnterpriseSLC 
print proof
4
19

Page 20

flourishing | green | dynamic | equitable
SLC 
print proof
20

Page 21

Contents
Foreword 2
Introduction 3
Our Vision 4
About Social Enterprise 5
National Context 6
South Lanarkshire Context 7
Objectives 9
Priorities 12
Case Studies 14
1
SLC 
print proof
21

Page 22

Foreword
Social Enterprises help make South Lanarkshire a green, dynamic 
and equitable place for all.
We know the social economy has the
ambition and power to transform the
lives of our local communities, tackling
inequalities, delivering local services
and products, and contributing to
the wellbeing and prosperity of our
local economy. And at the same time
reinvesting profits back into their
social mission.
We’ve seen social enterprises delivering innovative
responses to tackle climate challenge through food,
reuse and recycling initiatives and addressing wider
environmental impact through local production and
supply chains. Social enterprise is, indeed, a force for
good which we want to support and invest in.
To ensure our social economy continues to grow
in confidence, potential and capability, we have
prioritised our investment to enable the creation
of sustainable social enterprises that thrive,
grow, innovate, diversify, and support our local
communities., because enterprise is what makes the
social impact possible.
The 2021 Social Enterprise Census showed that 
South Lanarkshire had 177 social enteprises, 
an increase of 14 or 8.6% since the 2017 census.
Over 2015 to 2021 period, the number of social
enterprises operating in South Lanarkshire increased
by 34 or 23.7% which is greater than the increase
experienced by Scotland as a whole, of 16.3%.
We aim to build on this and invest further in social
enterprises start-up and existing businesses and
ensure that we support our social economy to
continue to innovate and grow.
Our social enterprises are motivated by a genuine
desire to create a meaningful and lasting impact in
our local communities, seeking to address social,
economic, and environmental issues with limited
resources – and often reliant on reducing grant funding
which is not sustainable.
We also recognise and celebrate the diversity of the
sector and its ability to respond in times of crisis as we
have seen through the Covid-19, and the current cost
of living crisis.
Our featured case studies with Clydesdale Community
Initiatives, Juniors Play Café, R:evolve Recycle,
Morphfit, Climate Action Strathaven, Social Enterprise
in Schools and Healthy and Active East Kilbride,
collectively demonstrate the range of supports and
services, and the different sectors in which social
enterprise operate.
This strategy has been designed in collaboration with
our wider third sector, partners, and stakeholders.
If we are to realise our multiple and far-reaching
aspirations for social enterprise in South Lanarkshire,
continued collaboration and partnership working with
the social economy, key public sector partners, and
the private sector, will be vital.
It is important that we also recognise the eco-system
of support already available, and we will fully utilise
this to ensure our social enterprises are empowered to
shape their own ambitious future and deliver on our
community wealth building approach.
Looking ahead to the future, the objectives set out in
this strategy are designed to create opportunities and
build strength and confidence for the sector to deliver
more services, tackle inequalities; and build strength
and confidence within our communities.
To drive forward these objectives, a newly formed SE
Steering group will develop key actions that take the
lead from the Scottish Government’s three priorities
for the sector, namely: stimulating social enterprise;
developing stronger organisations; and realising
market opportunity.
Our commitment to social enterprise is to deliver
direct investment and continue to build on a
sustainable social economy here in South Lanarkshire,
which in turn will help deliver social value; more local
services; and improved networking opportunities.
Councillor Robert Brown
Chair of Community and
Enterprise Committee
2 flourishing | green | dynamic | equitable
SLC 
print proof
22

Page 23

Introduction
This new strategy will support the social enterprise sector in three priority areas:
stimulating social enterprise activity, developing stronger organisations, and
realising market opportunity. South Lanarkshire Council, working with Voluntary
Action South Lanarkshire (VASLan) have co-produced this strategy following
consultation with the sector and wider stakeholders. This document represents a
next step in the journey to shape South Lanarkshire’s agenda for social enterprise,
building upon the excellent work which is already taking place.
This strategy is a first for South Lanarkshire and
marks a fresh start for a partnership approach to
further investment in local Social Enterprises.
A newly formed South Lanarkshire Social Economy
Steering group (SESG) is the leadership group for
developing and implementing this social enterprise
strategy and associated action plan. SESG
membership is made up public and third sector
leaders and influencers from organisations that
represent, work with, and provide business and
capacity building support to the enterprising third
sector and social enterprises in South Lanarkshire.
Steven Sweeney, CEO of Voluntary Action South
Lanarkshire and Chair of SESG said, “Social
Enterprises are a key enabler in the delivery of the
community planning partnership’s shared ambitions,
around People, Place and Planet. Together, we
can form a more flourishing, green, dynamic and
equitable Social Economy”.
3
SLC 
print proof
23

Page 24

Our vision
Our shared vision is to cultivate a vibrant, and growing social enterprise sector in
South Lanarkshire which creates social and environmental benefits for all.
To grow the local economy, increasing local spend with the Sector and targeting
support to our homegrown Social Enterprise
1 Aim
Objectives
Priorities
2
Priority 1:  Stimulating the social economy
Priority 2:  Developing stronger organisations
Priority 3:  Realising market opportunities
3
Invest in a more balanced and prosperous
economy for South Lanarkshire to:
• Deliver bespoke accelerator business support
programme(s) to 45 organisations from 
2022 onwards.
• Package up additional small grant funding in
2023 to support up to 30 organisations to start
up and increase trading.
• Work with SESG partners and wider public,
private and third sector stakeholders to
promote out good practice examples and
the sector generally, via case studies, social
media, and news releases.
Deliver local services and Influence more local
spend through effective use of procurement
and robust local supply chains. We will:
• Broker engagement with Business Gateway
and the wider business support offer to local
organisations seeking to take on leasing or
buying publicly owned buildings or land.
• Explore options for involvement and sign
up to the Scottish Government’s Corporate
Challenge and Buy Social programme
managed by Social Enterprise Scotland.
• Deliver a procurement workshop(s) for 
the sector.
• Promote out the Council’s new Community
Benefit menu and tool.
Engage our young people so that they better
understand social enterprise business models,
and:
• Direct young people to the training and
opportunities available through the Social
Enterprise Academy, Business Gateway’s
Business start-up support.
• Explore options for a South Lanarkshire
Social Enterprise ‘Shark Tank’ schools
initiative in 2024.
Act on Climate, to target investment and
support, we will:
• Deliver 2 bespoke sector workshops on
Net Zero for up to 50 organisations.
• Customise a digital solution and deliver
wraparound support to a cohort of 
30 social enterprises and,
• Create a sector pathway with the Net Zero
action planning tool.
Build strength and confidence within our
communities, as part of our joint ambition
to create thriving places we will:
• Commit to a place-based approach,
targeting investment to 6 – 8 local
community anchor organisations 
and support local social enterprise 
supply chains.
• Invest directly in our South Lanarkshire
Social Enterprise Network over the next
two years in support of shared learning
opportunities, networking, and peer
support to 150 organisations over the
lifetime of this strategy.
• Test a South Lanarkshire Community
Bond model and provide a range of
financial incentives to encourage people
to invest in local regeneration projects.
4 flourishing | green | dynamic | equitable
SLC 
print proof
24

Page 25

About Social Enterprise
Social Enterprise has a unique advantage in delivering local services, 
contributing to net zero and tackling inequalities
South Lanarkshire has a long tradition of socially
responsible business, most notably Robert Owen, 
of New Lanark, a mill owner and social reformer who
understood the importance of creating social good,
as well as economic wealth. This tradition continued
throughout Lanarkshire with the growth of the
cooperative movement and to the present day with
new forms of business in pursuit of a fairer and more
equitable society.
While there is no legal definition for social enterprise in
Scotland, it is broadly accepted that a social enterprise
trades for the benefit of all or most members of a
community, rather than the unlimited private gain of
the few. Its primary objective is to achieve social and
wider environmental benefit, and distinct from other
third sector organisations, social enterprises aspire to
financial independence through trading.
In Scotland, the ‘asset lock’ is the defining and
essential feature of social enterprise and should
be built into its business structure. The ‘asset lock’
sets out the requirement that upon dissolution of a
company, profits are reinvested in the business or in
the beneficiary community, and not distributed to
private owners, shareholders, or investors.
5
SLC 
print proof
25

Page 26

National Context
Social Enterprises provide a positive influence on the world of commerce,
representing a more ethical way of doing business
The Scottish Government’s 10-year strategy (Scotland’s Social Enterprise Strategy 2016- 2026) sets out the
Government’s commitment and ambition to developing and supporting the sector, recognising the vital role
it plays in our economy, in civil society and in creating a fairer, more equitable and inclusive Scotland.
Social Enterprise make a significant contribution to Scotland’s economy in most sectors including,
Education, Health, Housing and Employability. With over 6000 social enterprises operating in Scotland.
Community Wealth Building (CWB)
CWB is a place-based economic development model
rolling out throughout Scotland. This approach,
within the wider frame of the wellbeing economy,
is a model of economic development that over time
can deliver thriving communities, a fairer society
which are environmentally sustainable.
CWB looks to transform local and regional
economies to deliver on our ambitions for inclusive
growth and realise opportunities for more and
better jobs, business growth, community owned
assets and shorter supply chains supporting net
zero ambitions.
Social Enterprise Scotland (SES)
SES is the national representative body for social
enterprises in Scotland. A member-led organisation, 
SES champions and raises the profile of the sector,
campaigning and influencing on key issues and
policy. SES provides opportunities for social
enterprises to network, connect, learn, and share
experience and practice and supports initiatives to
encourage and increase trading. SES engages and
works with social enterprises, key stakeholders,
and a wide range of partners, to develop and grow a
collaborative movement that puts social enterprise
at the heart of Scotland’s future.
Social Enterprise Census
The biennial social enterprise census provides a
snapshot of the overall make up and economic
contribution of the sector. Scotland is recognised
as a global forerunner in social enterprise research,
policy, networks, and business support.
The latest 2021, census data alongside wider sector
consultation has helped inform this strategy. 
See page 8.
Sustainable Procurement
Sustainable procurement lies at the heart of the
Scottish Government’s commitment to deliver
inclusive economic growth, where social and
economic interventions are considered with equal
importance. With public spending worth more than
£13 billion annually, there is huge potential for social
enterprises to deliver more of Scotland’s services
and products, to the benefit of everyone.
That is why the Scottish Government has continued
to invest in national tailored business support to
the sector under the ‘Just Enterprise’ brand to
market and deliver start-up, business support and
leadership development services and crucially to
work with enterprising third sector organisations
to support both individual and consortia with
procurement and technical tendering support.
Many businesses have already started to change
their commercial procurement to increase social
value and take responsibility for their total
value chain impacts on people and the planet.
An expanding number of firms in Scotland have
systematically introduced social enterprises into
their supply chain, partly prompted by the public
sector duties and the legislative backing under the
Procurement Reform (Scotland) Act 2014.
Supplier Development Programme
(SDP)
The wider public sector, also invests in SDP to
support small to medium enterprises, including
social enterprise, with little or no experience of
tendering through a programme of free expert
training, support, and information to help
organisations win work with the public sector 
and to grow their business.
6 flourishing | green | dynamic | equitable
SLC 
print proof
26

Page 27

Social Enterprises that are locally rooted, community-led and trading for wider
community benefit are key to our community wealth building agenda.
South Lanarkshire Context
This strategy sets out a new and inspirational plan to achieve our ambition for local
social enterprises. 
A key aim of the community wealth building approach
is to influence spend towards local businesses, and
social enterprises, to help grow and sustain local
economies and promote positive social outcomes.
The actions flowing from this strategy are designed to
further develop and embed social enterprise business
models and support the sector move towards greater
financial independence, so that social enterprises can
thrive, grow, innovate, diversify, and further support
South Lanarkshire communities.
The South Lanarkshire Social Enterprise Network
(SLSEN) was recently launched as a platform to
network and share ideas, provide peer support,
encourage creative thinking, and recognise the
contribution that the wider sector delivers to address
local needs. Supported by VASLan, as the local Third
Sector Interface, SLSEN is the key networking forum
for both established and aspiring social enterprises.
It is in this context that the Council is working with
VASLan, SLSEN and the wider sector to develop
this first social enterprise strategy and action plan,
informed by what our communities have told us,
inherently linked to a range of new and /or refreshed
council and partner strategies and plans across the
Local Authority area.
Social enterprises are active across all sectors
of the economy. Here in South Lanarkshire,
the latest 2021 Census completed by 177
organisations, shows the largest fields of
activity for social enterprises are for Health and
Social Care (16%), Early Learning and Childcare
(16%) and Arts and Creative Industries (15%).
Four out of ten social enterprises trade
locally, whether in their local community
(25%) or within the local authority area (15%).
A significant number of South Lanarkshire
social enterprises have a wider reach, either
to neighbouring local authority areas (35%) or
Scotland-wide (25%).
7
SLC 
print proof
27

Page 28

£64m
Total annual income of
South Lanarkshire SEs
£119m
Net worth of South Lanarkshire’s 
social enterprises
Pay at least the Real Living
Wage to all employees92%
Won a public contract 
within the last 12 months20%
59%
Self-sufficiency as a proportion 
of income converted by trading
75% Led by women
63%
Earned income from
trading activities
1,280
Full time equivalent (FTE)
employees
£35m
GVA added to South
Lanarkshire economy
Social Enterprise in 
South Lanarkshire
- key facts Census 2021
78% Sell to direct consumers
26%
Located in rural 
South Lanarkshire
social
enterprises177
8 flourishing | green | dynamic | equitable
SLC 
print proof
28

Page 29

South Lanarkshire is in a good starting place, with
our social enterprises already working directly
to reduce the region’s social, economic, and
environmental impact through innovative care,
food, energy, tourism, and recycling initiatives.
Objectives
We realise the impact of social enterprises as a
powerful force for good. Working with the public,
private and third sector partners, our commitment is
to target the wider business support and investment,
ensuring social enterprises continue to grow in
confidence, potential and capability. This partnership
approach will create the right infrastructure for
new models of business to emerge, such as social
enterprises because enterprise is what makes the social
impact possible.
Our shared vision   is to cultivate a
vibrant, and growing social enterprise sector
in South Lanarkshire which creates social
and environmental benefits for all.
9
SLC 
print proof
29

Page 30

Invest in a more Balanced and Prosperous
Economy for South Lanarkshire
With a commitment to delivering social impact,
social enterprises lead the way in harnessing the
belief that commercial activity has a responsibility
beyond turning a profit.
By better demonstrating social impact and raising
awareness of the sector here in South Lanarkshire,
the objective is to, target and bring in more
investment, generate a greater understanding of
the importance of social enterprise, making the
sector more visible, valued, and accessible 
to communities.
There are some locations in South Lanarkshire,
particularly local towns and villages, where
there are clusters of organisations who play an
important role in delivering inclusive economies.
By creating the right conditions in local towns
and neighbourhoods, we can further support the
enterprising third sector to collaborate, share space
and diversify to provide a better offering for users.
Deliver Local Services
Social Enterprises are motivated by core
aspirations to improve our personal, collective, and
environmental wellbeing. A desire to live better, more
sustainable lives, means consumers are increasingly
making ethical choices on where to shop and what
products to purchase. Our Social enterprises, ethical
businesses, credit unions, housing associations,
community interest companies, and development
trusts can deliver enhanced brand awareness
and reputation for customers and consumers,
particularly as these enterprises are motivated by
core aspirations to improve personal, collective, and
environmental wellbeing.
The 2021 survey results reinforce two key trends.
First, the overall reduction in the share of social
enterprises doing business with the public sector
(down from 60% in 2015 to 50% in 2021). Second,
the increase in social enterprises serving the general
public (up from 68% to 82%).
This strategy recognises social enterprises as a
vehicle for localised service delivery and community-
led regeneration.
Engage Young People
Young people bring progressive values and new expectations about
society, business, and life. For us, the social economy and social
entrepreneurship an integral part of preparing young people for the
world of work. Underpinning this approach is to ensure young people
better understand social enterprise business models and ethos by
giving them the opportunities to set up and grow social enterprises in
their schools and communities. By raising awareness of the sector, we
will promote opportunities and careers to young people working in and
starting up new social enterprise helping young people to fulfil their
potential, develop key employability skills, whilst aspiring to affect 
ongoing social change in their communities and beyond.
10 flourishing | green | dynamic | equitable
SLC 
print proof
30

Page 31

Act on Climate
South Lanarkshire’s social economy is ideally placed as
a sector to play a leading role towards Net Zero in that
social enterprises already consider the triple bottom
line of social, economic, and environmental impact.
With this additional investment and support,
organisations will be better equipped to make Net
Zero a reality for themselves and the benefit of
communities they work with. The actions linked to
this strategy seek to build knowledge and support for
social enterprise to play an inspirational and leading
role in delivering Scotland’s Net Zero transition by
2045 in a fair and just way.
Climate challenge will not affect everyone to the
same degree, and we want an approach that
supports the sector along the journey, championing
social justice and reducing the effects of poverty
supported through improved digital, sustainable and
green infrastructure.
Build Strength and Confidence within 
our Communities
South Lanarkshire is already a great place to live,
work and visit. As a partnership, the Social Economy
Steering group members, want to do more, which
is why we are further investing in local social
enterprises to ensure that they thrive and grow. This
fits with our ambition to create thriving places where
people can access local goods and services on foot or
via public transport.
Local community anchor organisations play a key
role in supporting us develop small, locally owned
enterprises which retain wealth in the local economy,
and we are committed to this place-based approach,
working with partners to develop robust local supply
chains of social enterprises likely to support good
employment and retain work locally.
We will also look to maximise community benefit
outcomes for social enterprises, strengthening
collaboration and social impact across the public and
third sector which will enable the local economy to
further grow and develop.
Influence more local spend and robust
local supply chains
Social enterprises offer public bodies an
opportunity to practice more socially,
environmentally, and economically responsible
procurement. It is a key requirement for public
bodies to evidence how its procurement
processes have facilitated the involvement
of small to medium enterprises, third sector
and supported business under the sustainable
procurement duty as outlined in the Procurement
Reform (Scotland) Act 2014.
So, for our enterprises who want to become
tender ready and bid for contracts, we will
strengthen and target our existing business
offering including that which is offered through
the Supplier Development Programme,
Lanarkshire Business Gateway and the wider
ecosystem, supporting the local economy to
grow effective use of procurement to benefit local
communities.
And by working together with other large public,
private and third sector partners we will embrace
progressive procurement approaches in South
Lanarkshire, to develop dense supply chains and
keeping more of our activity and spend local.
11
SLC 
print proof
31

Page 32

Priority 1
Stimulating Social Enterprise
Working with public, private and
third sector partners we will generate
awareness and greater understanding 
of the social economy and encourage
start up social enterprises and growth
here in South Lanarkshire.
We will:
Target business support to grow social
enterprises (SEs) and improve sustainability
of the sector throughout South Lanarkshire.  
Work with partners to support organisations
which offer volunteering opportunities as a
route to employment.
Pilot a community bond to unlock other
sources of local investment to enable
communities to thrive and provide a
bond guarantee that will give local people
confidence to invest.
Invest in social enterprises and enterprising
third sector organisations to generate more of
their own funding through trading.  
Work with partners and support the
development of co-working spaces where
social entrepreneurs can collaborate with
others to deliver social innovation.
Maximise opportunities for young people
to learn about, social enterprise business
models, and opportunities to set up and
grow social enterprises in their schools and
communities.  
Invest in the development of the South
Lanarkshire Social Enterprise Network
(SLSEN).
Deliver a Net Zero (NZ) pilot, building capacity
of social enterprises and developing the tools
to progress further along their NZ journey.
Priority 2
Developing Stronger Organisations
We will target capacity building and 
the wider business support offer to 
social enterprises, so that organisations
can access the resources, knowledge 
and support needed and achieve 
greater potential.
We will:
Draw on the expertise through business
support, including our business gateway
contract to encourage social enterprises to
consider how they can diversify their income
and explore blended finance models.
Build on existing knowledge of market supply
through further analysis of the National Social
Enterprise Census 2021 data to identify new
opportunities for local business to grow.
Develop a wider third sector business
support offer out to enterprising third sector
organisations.
Increase networking opportunities, peer to
peer support and knowledge exchange for the
sector.
Invest in the sector and package up new
funding for social enterprises to test new
ideas, support trial trading, make better use of
technology and support entrepreneurship.
Build on the strength of collaboration within
the sector and encourage and support
consortia development.
Work with private sector and partners, to
maximise community benefit outcomes and
encourage our businesses to volunteer with
and mentor social enterprises. 
Explore how we can best support social
enterprises to work together to create
a culture of self-evaluation and impact
measurement.
12 flourishing | green | dynamic | equitable
SLC 
print proof
32

Page 33

Priority 3
Realising Market Opportunity
The SESG partnership ambition is to
increase the number and range of social
enterprises directly involved in selling
to consumers, the public and private
sector, and to increase supply chain
opportunities in the delivery of local
products and services.
We will:
Promote the Living Wage and Fair Work
practices throughout our social economy to
improve the prospects and wellbeing of our
communities.
Encourage partnership and consortium
development in the sector and build capacity
of social enterprise to compete for contracts.
Continue to develop how our wider third
sector business support offer can help
strengthen the social economy.
Encourage greater collaboration between the
public and third sector local service delivery
offering as an output of the Community Asset
Transfer process.
Expand the capability of local social
enterprises to bid for public sector
contracts, brokering support from economic
development and procurement including the
Supplier Development Programme and Just
Enterprise
Work with our community anchor institutions
to explore further opportunities for more
local spend through the local social enterprise
supply chain
Maximise the Council’s community benefit
outcomes.
What does success
look like?
This strategy, which is aligned with the priority
outcomes in South Lanarkshire’s Community Wealth
Building Strategy and Third Sector Strategy, takes its
lead from the Scottish Government’s three priorities
for the Sector: Stimulating Social Enterprise;
Developing Stronger Organisations; and Realising
Market Opportunity.
By delivering on this Social Enterprise Strategy, 
we will contribute to key priority outcomes, 
using the following key indicators:
2021 South Lanarkshire baseline established
for Turnover and GVA (data from the 2021 SE
National Census).
Increase in the number of social enterprises
based in South Lanarkshire, (measured
biannually via the SE National Census data).  
Increase in the number of social enterprises
becoming ‘tender ready’.
Increase in the number of supply chain
opportunities promoted out to local social
enterprises.
Additional investment into development and
growth of the sector, including instances of
targeted business support.
Increase in the number of social enterprises
further along the journey to Net Zero
Resourcing the South Lanarkshire Social
Enterprise Network and opportunities for the
sector to network, collaborate and deliver 
peer support.
13
SLC 
print proof
33

Page 34

Heart of Africa
Heart of Africa UK, supports and promotes
health advancement in Scotland and Africa,
through their healthy eating and cooking
programmes. Currently catering for weekly lunch
club members, working in partnership with
Larkhall and District Volunteer group.
The objective of the charity is the prevention
or relief of poverty, supporting and promoting
health advancement in Scotland and Africa,
through their healthy eating and cooking
programme.
Their activities are informed by
comprehensive empirical studies and
high-quality data evaluation with the
aim of promoting equality and diversity,
and integration through arts, food, and
community activities. Heart of Africa
has recently engaged with our business
support offer through Lanarkshire Business
Gateway to grow their impact and diversify
their income.
Case Studies
Clydesdale Community Initiatives
Clydesdale Community Initiatives (CCI) based
in Lanark, was established in 2002 to support
people, facing barriers to inclusion, to contribute
to their community, through developing skills and
gaining real work experience.
Since 2015 the enterprise has operated from
Langloch Farm. The business has evolved and
developed to embrace and showcase the work
of the Charity, to include a Tea Room, Gift Shop,
wood craft workshop and Nature Play Areas,
opening to the public in 2019.
Langloch Farm produces a range of products
including outdoor furniture and garden items to
beautiful botanics such as lip balms, soaps, 
and sugar scrubs.
The woodcraft workshop not only supplies
products to the farm gift shop, but it also carries
out projects, both onsite for CCI and offsite for
customers such as South Lanarkshire Council 
and the NHS.
Farm Botanics enterprise products are made
on site. Most of the ingredients for the Botanics
range are grown and processed at Langloch Farm,
with additional organic ingredients thoughtfully
and ethically outsourced.
This award-winning social enterprise model
empowers individuals to learn new skills, improve
their health and wellbeing and most importantly
see themselves (and be seen by others) as active
members of their community.
14 flourishing | green | dynamic | equitable
SLC 
print proof
34

Page 35

R:evolve Recycle
R:evolve Recycle was established in 2015 in
response to the concern for the increase in 
‘fast fashion’. 100% of items donated, are reused,
or recycled through multiple pathways including
the clothing bank, workshop programme and
links with local charities.
Based on old fashioned concepts of swapping,
sharing and mending clothes, the project operates
two high street swap shop boutiques, offering
a tangible platform for people to engage in the
circular economy in South Lanarkshire.
Wee Jinty’s Eco Haberdashery and R:evolve
thrift + gift enterprises, all increase the value of
end of life, vintage and second-hand clothing,
developing a sustainable income stream which
is reinvested to keep the swap shops free to
customers. The enterprise also offers a retail
platform for local artists and makers who share
the same social purpose.
Since its inception R:evolve Recycle have saved
over 110 tonnes of textiles, bringing them back
into circulation and away from landfill through
social enterprise, sustainable pathways 
and partnerships.
Morphfit
The MorphFit Gentle Movement Project have been
operating since 2021 and recently was recognised with
the award for Enterprise and Innovation at the 2022
Voluntary Sector (Voluntary Action South Lanarkshire)
awards. Their programme offers fully funded online
Gentle Movement Exercises for The Elderly, all those
who are shielding or in Isolation and to anyone who has
acknowledged health issues.
Clients include Sense Scotland, The Beatson, 
The Haven, MS Society, Bothwell Medical Centre, and
The Lanarkshire Carers Association. Morphfit’s main
aim is to deliver unique online services back into local
communities, helping maintain mobility, fitness and
health and help reduce social isolation.
The Morphfit Gentle Movement Project Ltd is actively
building partnerships to deliver online services for the
elderly, people experiencing health issues and to carers
and improve, physical and mental health and wellbeing.
The enterprise also delivers programmes including
baby massage classes for babies six weeks to six
months to deliver benefits which promote sleep,
aid digestion and address issues such as colic.
Juniors Play Café
This award-winning play café offers for families
with young children a chance to meet and chat
whilst the children enjoy soft play and access
imagination play. The facility, based in Hamilton,
also hosts a fully accessible café, where a
selection of food and home baking is available.
The soft play which has been specially designed
to encourage imagination play and to enhance the
social and physical development of children, also
caters for children with additional support needs.
15
SLC 
print proof
35

Page 36

Healthy and Active East Kilbride (HAEK)
Ever evolving since it began in 2003, HAEK main aim 
is to help improve the quality of life, mental and 
physical health and overall wellbeing of the people 
and communities in East Kilbride.
The Meeting Place is their Community Hub with a
community café offering a wide range of activities,
information, services, and support to the people 
of South Lanarkshire and is located within 
East Kilbride Town Centre.
The enterprise operates a minibus service, collecting
older people to and from home and East Kilbride Town
Centre and is supported by their shop mobility services.
HEAK provides a range of health and wellbeing classes
and activities including Art, Mindfulness and Tai Chi etc.
They work in partnership with the NHS, South Lanarkshire
Council, and other key public sector and third sector
partners supported by a strong team of volunteers.
Climate Action Strathaven
Climate Action Strathaven aims to raise
awareness about the reality of the impacts of
climate breakdown and work towards a more
sustainable future for the people of Strathaven
and surrounding areas, by bringing communities
together to act on and mobilise resources locally.
Established in 2019, the enterprise has in its first
year of becoming a charity, opened a pop-up cycle
repair facility at the Strathaven Town Mill Arts and
Heritage Centre and repaired over 350 bikes, (they
currently operate a low-cost weekend bike repair
shop and have a range of pre-loved bikes for sale).
They also published a sustainable Strathaven
manifesto and worked with local groups on
growing and allotments to develop sustainable
food options.
Members have gone on to set up a cargo-club
delivering goods locally in a sustainable way.
Avondale Cargo Club are also partnering with
two branches of Boots Pharmacy, to offer a low-
cost, carbon-free prescription delivery service to
residents of Strathaven and the surrounding areas.
Through their partnership with Karshare UK, 
they have established a car club, which currently
has three vehicles listed with many more 
expected in the coming weeks.
16 flourishing | green | dynamic | equitable
SLC 
print proof
36

Page 37

Promoting Social Enterprise in our Schools
Supporting young people across Scotland to set
up social enterprises that solve the issues that
matter to them while developing key skills for
the future is something that we are all passionate
about. Working with the Social Enterprise
Academy to deliver workshops and encourage the
next generation of social entrepreneurs, here is a
flavour of just some of the enterprises in primary
and secondary schools taking place across 
South Lanarkshire.
Greenhills Primary – Their social enterprise
project is called B4. It supports the provision 
of positive mental health activities in school and
the pupils are selling bangles and bracelets 
that can help with anxiety.
St Andrews and St Brides – Their social
enterprise project ‘The Kitroom’ looks to provide
used football boots at an affordable price while
also helping to tackle climate change by stopping
waste. Their enterprise was inspired by an 
S3 pupil noticing how quickly he was growing 
out of football boots before they were even 
close to worn through. This school won the 
Sustainable Fashion Dragons’ Den.
Chapelton Primary – Their social project is 
called ‘one small step’. Inspired by a significant
loss at the school this brilliant group of pupils
have created a range of products promoting
positive mental health. Chapelton won the 
Financial Education Dragons’ Den.
17
SLC 
print proof
37

Page 38

www.southlanarkshire.gov.uk
If you need this information in another language or format, 
please contact us to discuss how we can best meet your needs.
Phone: 0303 123 1015  Email: equalities@southlanarkshire.gov.uk
Produced for Community and Enterprise Resources by Communications and Strategy. 063715/May23
SLC 
print proof
38

Page 39

Appendix 2: List of Consultees 
South Lanarkshire Social Enterprise Strategy 
The Council consulted with the wider third sector via a survey monkey questionnaire,
promoted out through SLC and VASLAN with 15 third sector responses received. 
We have also undertaken further individual consultation with third sector lead officers made
up of:
- Clydesdale Community Initiatives
- Healthy Valleys
- Healthy n Happy
- VASLAN
- Healthy and Active East Kilbride 
A further partner / stakeholder focus group session on 14 September 2022 was attended by:
• David Anderson, SLC Procurement Team
• John McCafferty, SLC Communities Team
• Kim Wallace, Social Enterprise Scotland
• Mark Houston, Hub SW
• Jennifer Payne, Supplier Development Programme
• Bill Duncan, Elevator UK (contractor delivering Lanarkshire Business Gateway)
• Charlie Duffin, Voluntary Action South Lanarkshire (VASLan)
• Monica Alan, VASLan
• Alana McGlynn, NHS Lanarkshire
• Amanda Burghauer, Exec Director Common Weal South Lanarkshire, and voluntary
sector Board member 
An on-line workshop delivered by VASLAN open to the wider community, partners, and
stakeholders was attended by a further 8 third sector representatives on the 22 September
2022. 
From the Council, we engaged with the following team, initiatives, or programmes: 
- Planning (C&E resources)
- Economic Development (C&E resources)
- External funding (C&E resources)
- Tackling poverty (Community Planning Partnership)
- Rural development (C&E resources)
- Procurement (Finance and Corporate)
- Performance and Policy (C&E resources)
- Communications and Strategy 
National and other Local Authorities:
- Social Enterprise Scotland
- Community Enterprise in Scotland
- Supplier Development Programme
- North Lanarkshire Council, Economic Development Team 
4
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 6 June 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Supplier Engagement 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the Commission on the engagement activities that have been
undertaken to assist local businesses to access South Lanarkshire Council
tender opportunities.  This includes the South Lanarkshire Council Supplier
Engagement Survey which was cascaded to the local business base during
September 2022 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) the contents of this report are noted and proposed further actions pursued. 
3. Background
3.1. A key objective of the Community Wealth Building (CWB) Strategy is to increase the
levels of spend by the Council and anchor institutions within the South Lanarkshire
area.  An action plan supports the Spend Pillar of the Strategy and includes
reviewing the processes for how the Council procures, engages and supports
businesses and identifies and promotes increased tender opportunities. 
3.2. The CWB ’Spend Pillar’ Group agreed that ascertaining the skills, experience and
thoughts of the local business base would help to further tailor how to support these
businesses going forward in relation to increasing the number of local Small Medium
Enterprises (SMEs) securing contracts with South Lanarkshire Council.  This could
be achieved by undertaking a survey of South Lanarkshire businesses.  This would
complement the wide range of promotional activity and training already being
undertaken. 
4. Business Survey 
4.1. The online survey was open from 2 to 30 September 2022.  The survey was
marketed via social media channels (Twitter, Facebook and Linkedin) and was also
cascaded to 13 partner organisations, detailed below, to share with their client
bases.  An email was also sent by Eliot Jordan, Economic Development Lead Officer
on Construction Sector, to all relevant businesses on the FAME database of
companies (981 listed) which Economic Development subscribe to. 
5
41

Page 42

4.2. The partner organisations this survey was cascaded to were:- 
 Business Gateway
 CEED (Centre for Engineering Education and Development)
 CITB (Construction Industry Training board)
 Federation of Small Business
 Hub South West
 Lanarkshire Business Group
 Lanarkshire Business Hub (via New College Lanarkshire)
 Lanarkshire Chamber of Commerce 
 Procurement for Housing Scotland
 Skills Development Scotland
 Scottish Engineering
 Scotland Food and Drink
 Scottish Procurement Alliance 
Therefore, the survey has been marketed widely across the Council area and
business sector networks. 
5. Survey Responses 
5.1. Overall, 243 respondents completed the questionnaire, 221 of which are located in
South Lanarkshire.  This is considered a good return for this form of engagement
and the timescale the survey was open.  Information on the make-up of the
respondents is provided below:- 
 number of employees:-
 89% have less than 50 employees 
 29% have between 2 and 4
 16% have 1 
 turnover:-
 33% have a turnover of £84,999 or less
 3% have a turnover greater than £10m 
 sectors:-
 19% construction
 11% professional, scientific and technical 
 7% transport and storage
 7% education 
 5% human health and social work
 51% other (e.g., wholesale, retail, accommodation, and food services) 
 social enterprise:-
 8% of the respondent businesses are Social Enterprises 
5.2. The main findings are:- 
 71% of respondents feel they know where to access public sector opportunities. 
 Of the businesses who tendered for contracts with the Council over the past 2
years, 81% found the tender process easy to follow. 
42

Page 43

 29% have never tendered for public sector contracts. 
 65% are aware of the Quick Quote process. 
 86% are aware of Public Contracts Scotland. 
 81% found the tender process easy to follow. 
 60% found the feedback received from tenders to be good or excellent, with
37% rating it average and 3% rating it poor. 
 57% attended Supplier Development Meet the Buyer event. 
 53% have 1 person responsible for tendering for public sector contracts. 
 82% are willing to invest in additional resources to bid for public sector
contracts. 
 62% of respondents feel they have the skills/knowledge/experience in their
business to tender for public sector contracts. 
 84% of respondents were not aware of the change to standing orders allowing
works contracts up to £2 million to be tendered for via Quick Quote and of the
applicable respondents; 71% feel this change will make them more likely to
tender for such works. 
 89% have been happy with their involvement in a procurement exercise carried
out by South Lanarkshire Council in the past two years. 
 66% have won a contract with South Lanarkshire in the past 2 years. 
 58% typically bid for contracts with a value less than £0.5m. 
 20% have been involved in the delivery of a South Lanarkshire contract as a
subcontractor. 
 62% of respondents have not received training, support or advice on tendering
for Scottish public sector contracts; of these respondents 74% did not know that
free tender training is available. 
 The main barriers to public sector procurement are seen as:-
 lack of training in the requirements of public sector procurement
 lack of awareness of tendering opportunities
 lack of internal resources to bid for work. 
6. Observations from Survey
6.1. It is encouraging that most businesses are confident in accessing procurement
opportunities and the processes followed.  However, there is a need to focus on the
29% who have never tendered for public sector contracts to ensure there is
increased awareness of the opportunities which do exist.  Although it should be
acknowledged that some of these businesses may not provide the goods and
services procured by the public sector. 
43

Page 44

6.2. The high percentage of respondents who are not aware of the changes to Quick
Quote (at 84%), suggest further promotional work is required to raise awareness. 
Although some reassurance is provided with the high level of awareness of Public
Contracts Scotland (at 86%).  It is positive the changes to Quick Quote would
reportedly make a significant majority of businesses more likely to tender in future. 
6.3. It is reassuring that 81% found the tender process easy to follow and 89% are happy
with their involvement in South Lanarkshire Procurement.  With just over half
respondents having just 1 person to work on tenders, it is possible this resourcing
issue is restricting participation levels.  However, it is encouraging 82% are willing to
invest in additional resources to bid for public sector contracts. 
6.4. The apparent lack of awareness that free training and support is available to
businesses is surprising given this has been delivered by the Supplier Development
Programme (SDP) for several years, is promoted through business support
channels, such as the SDP’s website and local authority websites, Business
Gateway, national portal-Find Business Support and many Meet the Buyer and
similar events.  SDP is adept at promoting events through social media channels. 
6.5. The Business Gateway Expert Help framework, which offers businesses enhanced 1
to 1 support from consultants in procurement as well as other specialists, has proved
extremely successful.  The capacity for procurement support is one of the most
popular areas of specialist support and has consistently been oversubscribed.  South
and North Lanarkshire Councils are currently in the process of renewing an expert
help framework and when relaunched, this will prove invaluable in helping local
businesses achieve “tender readiness.” 
6.6. The lack of awareness of tendering opportunities seems likely to represent a minority
of businesses given 71% know where to access tender opportunities.  The lack of
internal resources to bid for contracts is supported by 53% having 1 person
responsible for tendering for public sector contracts. 
7. Other Supplier Engagement Events and Activities
7.1. Over the last 2 years, the Council, in partnership with the SDP, has delivered the
following bespoke aligned tender training and supplier engagement events,
businesses are signposted to the ongoing programme of free tender training and
online e-learning that is provided by the SDP:- 
Event date Event name
24-Mar-21 / 08-Apr-21
/ 08-Jul-21
South Lanarkshire Council: Training and Employability
Framework
38 bookings, 29 attended
67 bookings, 34 attended
58 bookings, 46 attended
15-Feb-22 South Lanarkshire Council: New Quick Quote Process
171 bookings, 78 attended
07-Jun-22 Meet the Contractor - Morrison Construction
23-Aug-22 Talking Tenders with South Lanarkshire Council
183 bookings, 101 attended
24-Nov-22
South Lanarkshire Council Supplier Engagement
Event: Roads and Infrastructure Framework
81 bookings, 53 attended
15-Dec-22 South Lanarkshire Council Supplier Engagement
Event: Roads and Infrastructure Framework
44

Page 45

Event date Event name
58 bookings, 34 attended
22-Feb-23 Meet the Real Buyer 
632 bookings, 337 attendees
06-April-23
South Lanarkshire Council & Social Enterprises: A
Conversation about Public Sector Contracts
19 bookings, 11 attended
06-Apr-23
South Lanarkshire Council: Training and Employability
Framework
38 bookings, 29 attended
67 bookings, 34 attended
58 bookings, 46 attended 
8. Meet the Real Buyer Lanarkshire
8.1. Meet the Real Buyer took place on 22 February 2023 in the Banqueting Hall, Council
Offices, Hamilton.  This was the third such event following a South Lanarkshire only
face-to-face event pre-Covid, held on 27 November 2018 and a virtual event held on
30 November 2021.  As with the previous events this will delivered in partnership
with the SDP. 
8.2. This Meet the "Real" Buyer event affords suppliers that wish to do business in
Lanarkshire unprecedented access to leading contractors and local authority
services that commission the actual work.  As part of this event, they learn more
about the upcoming contracts that businesses can tender for in the future.  It gives
businesses the opportunity to raise their profile and prepare for upcoming contract
opportunities. 
8.3. This event was different from previous as a few changes regarding how to deliver the
event were made:- 
 buyers from South and North Lanarkshire Councils would be on the same,
shared stands.  These stands would be demarcated by what each of the
representative services deliver, this would allow both buyers and suppliers the
opportunity to engage with their particular area of expertise more effectively.
This meant the stands were categorised as such:- 
 Cleaning and Catering
 Construction and Professional Services
 IT, Finance and Corporate
 Leisure and Culture
 Roads and Fleet
 Social Care and Education
 Waste, Environmental and Grounds 
 there would be no workshops by ‘marketplace’ exhibitors, only local authority
buyers and other public sector organisations, who are directly involved with the
procurement of goods and services, namely:- 
 Hub South West
 Scotland Excel
 Scottish Procurement Alliance
 Procurement for Housing Scotland
 Supplier Development Programme 
45

Page 46

 to give attendees appropriate information, each local authority produced an
FAQs booklet, these were given to businesses when they registered on the day. 
8.4. South and North Lanarkshire Council Procurement Teams played an integral part in
the event, primarily in securing the attendance and buy-in, of the buyers from the
relevant resources. 
8.5. The event was marketed extensively via social media and partner organisations were
asked to cascade information on the event to their contacts.  An SLC “all users”
email was sent to encourage staff to cascade the information to relevant businesses,
friends or family members. 
8.6. This resulted in 632 registrations for the event, 337 of whom attended on the day,
this is an impressive attendance rate for such an event.  Of those attendees 200
unique Scottish SME businesses were represented.  78 of these SMEs were based
in South Lanarkshire and 46 were based in North Lanarkshire. 
8.7. Anecdotal evidence on the day gave the following:- 
 feedback from the attendees has been universally positive, some even saying it
was the best of these type of events they have attended. 
 the “real” buyers on the day, again, were all positive.  There is no doubt that this
positivity contributed to attendee experience. 
all the external exhibitors were positive about the day and all felt their attendance
was beneficial for them and the attendees and would participate in future events. 
8.8. The post-event supplier feedback survey highlighted:- 
 94% of respondents were more likely to bid for public sector contracts after
attending the Lanarkshire Meet the Real Buyer event
 71% rated overall experience of the event as ‘excellent’ or ‘good’  
 41% of respondents had participated in SDP training and/or events
 100% said these helped their business to build confidence around public sector
tendering
 57% said that SDP training or events helped their business to improve
tendering skills 
SDP delivered exhibitor training in advance of Meet the Buyer on top tips for supplier
engagement, which was well received by representatives of both local authorities
and particularly by those who had never taken part in an event of this kind
previously.  However, comments from suppliers show that there may be benefit to
providing a supplier-side training webinar, in advance of future events, to aid
suppliers to understand how to find and attract the specific range of buyers that they
were looking to meet on the day. 
8.9. The annual national Meet the Buyer event took place on 17 May 2023 at the
Edinburgh International Conference Centre.  South Lanarkshire Council and the SDP
exhibited.  Businesses were able to introduce their company, talk to the key contacts
and find out about what tenders’ buyers have in the pipeline for the supply of
materials, goods and services. Participant feedback and evaluation will follow. 
46

Page 47

9. Next Steps
9.1. The review of the survey responses confirms that the range of actions which are
being progressed under the current action plan in relation to training and awareness
raising, are highly relevant.  However, further activity will take place focussing on the
preparation of an awareness and training plan for 2023/2024 to extend the reach to
more businesses covering:- 
 earlier identification of potential contracts and cascading of this information to
the relevant businesses
 further training of SLC quick quote process 
 specific promotion of quick quote opportunities 
 further promotion of free procurement training aligned with the continued
support of the SDP ensuring that all Business Gateway advisers are aware of
the programme and what it delivers
 review of the detailed feedback from SDP following the Meet the Real Buyer
event 
9.2. A second business survey will be completed in 2024/2025, the results of which will
allow a comparison to be made with results from the one completed in 2022/2023. 
10. Employee Implications
10.1. Existing resources from Procurement, Economic Development, Roads, Property
Services and the SDP are committed to the activity covered in this report. 
11. Financial Implications
11.1. There are no direct financial implications arising from the content of the report.
However, the use of more local companies may increase the cost to the Council at a
time of significant financial pressures across the public sector. 
12. Climate Change, Sustainability and Environmental Implications
12.1. An increase in local procurement should support the Council’s climate change and
sustainability targets, primarily due to less transporting of the provision of goods and
services. 
13. Other Implications
13.1. There is a risk that the local spend performance does not increase because of a
range of factors, including there being limited alignment between the requirements of
the council and the goods and services provided locally, local businesses not
possessing the resources to bid and insufficient contract opportunities being
available.  The spend pillar action plan details a wide range of activity that seeks to
mitigate this risk. 
14. Equality Impact Assessment and Consultation Arrangements
14.1. There are no Equality Impact Assessment or consultation arrangement implications
associated with this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
18 May 2023 
47

Page 48

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Thriving business, fair jobs and vibrant town centres 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
E-mail:  eliot.jordan@southlanarkshire.gov.uk
48

Page 49

Report 
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 6 June 2023
Report by: Executive Director (Housing and Technical Resources)  
Subject: Community Benefits Associated with the Council’s
Affordable Housing Supply Programme 
1. Purpose of Report
1.1. The purpose of this report is to update the Community Wealth Building Commission
on:- 
 an overview of the approach taken by South Lanarkshire Council to enabling
maximum community benefits from construction projects within its Affordable
Housing Supply Programme and non-domestic estate; and 
 examples of recent South Lanarkshire Council led construction projects that have
had direct contribution to the Community Wealth Building ambitions across South
Lanarkshire 
2. Recommendations
2.1. The Community Wealth Building Commission is asked to approve the following
recommendation(s):- 
(1) that the approach taken by the Council to enable the maximum community
benefits from construction projects within its Affordable Housing Supply
Programme and non-domestic estate, be noted; and
(2) that the examples provided within Appendix 1, be noted. 
3. Background
3.1. Within the ‘Land and Property’ Pillar of the South Lanarkshire Community Wealth
Building (CWB) Strategy implemented in 2021, the Council’s Housing and Technical
Resources is responsible for the delivery of actions to increase the supply of
affordable housing within South Lanarkshire, ensuring consideration is given to how
this can also result in wealth being generated or retained locally. 
3.2. As set out in the South Lanarkshire Local Housing Strategy 2022-27, increasing the
supply of affordable housing will be achieved, in part, through the delivery of the
Council’s Affordable Housing Supply Programme which, as approved by the Council’s
Executive Committee on 30 November 2022, aims to deliver a further 1,300 additional
council homes by 31 March 2028.   
3.3. The delivery of new council housing supply attracts significant levels of grant funding
from the Scottish Government, alongside sustained investment from the Council’s
Housing Revenue Account.  As such, opportunities exist to ensure this funding
generates direct and indirect benefits for local people, businesses and services in
addition to positive outcomes for new or existing South Lanarkshire Council tenants.   
6
49

Page 50

3.4. In addition, the Council aims to maintain its non-domestic assets and ensure it
continues to meet the needs of the local community.  This includes ensuring its school
estate and other public buildings are fit for purpose and adapt as the population
fluctuates and changes in demand for different services occurs. 
4. Community Benefits and Alignment with Community Wealth Building
4.1. Each year, local authorities across Scotland spend significant sums on works, goods
and services that are essential to the delivery of public services in local communities.
In procuring such works, including the construction of new homes or non-domestic
buildings, there are opportunities to consider and implement a range of initiatives that
would promote skills, training, apprenticeships and employment of local people. 
4.2. Other community gains exist through the procurement and delivery of construction
projects led by councils or other public sector services.  This includes support for the
third sector (including social enterprises, social firms and supported businesses) and
direct financial awards to identified local causes.  The scope of these benefits is
dependent on the scale of the construction project and are set out in the national
Employment and Skills Strategy and the Council’s own Procurement Community
Benefit Menu. 
4.3. Community benefits from these projects are directly aligned with the wider CWB
ambitions adopted in South Lanarkshire, allowing further local positive outcomes to be
achieved through the investment in both housing and public sector buildings.  The
diagram below sets out the lead categories contained within the Council’s Community
Benefit menu alongside key aims within the current ‘Spending’ and ‘Land and
Property’ CWB strategy pillars.  The menu is utilised as part of the tender process for
construction contracts issued by the Council. 
5. Examples of Projects Contributing to the Community Wealth Building Agenda
5.1. During 2022/2023, the Council delivered 176 new build council homes as part of its
ongoing Affordable Housing Supply Programme.  This included sites across East
Kilbride, Hamilton, Larkhall and Blantyre and equated to over £10million in grant
funding being successfully acquired from the Scottish Government.  Key projects
delivered within this included completion of the housing-led regeneration of
Whitlawburn and new technology enabled amenity homes on the site of the former St
Joseph’s primary school in Blantyre. 
Community Benefit Menu
Supporting Training/Employment and Work Experience
Supporting the Local Economy
Supporting Young People
Engaging with Local Communities
Financial Support to Communities
Physical/Environment Improvements in Local Communities
Spending Pillar
The council will support and encourage
the local economy to grow sustainably
through effective use of procurement to
benefit local communities. 
Land and Property Pillar
The council will use or repurpose both
council property and assets in a socially
productive way to generate wealth for
local citizens. 
50

Page 51

5.2. In addition, the Council continued to invest in its non-domestic assets to ensure they
remain fit for purpose and meet the needs of the community.  This includes work to
increase capacity within the existing school estate through a number of extension
projects.  Within 2022/2023, the extension of Newton Farm Primary School in
Cambuslang was completed, providing accommodation for a further 222 pupils. 
5.3. Details of each of these projects, including the community benefits acquired from
each, has been provided in Appendix 1.   
6.  Next Steps
6.1. South Lanarkshire Council will continue to work with partners to increase the supply of
affordable housing in South Lanarkshire.  This includes maximising opportunities to
provide community benefits to local residents, businesses and services from the
programme.   
6.2. The Council will continue to ensure alignment between key strategies and policies
within this agenda including the newly proposed South Lanarkshire Social Enterprise
Strategy 2023 to 2028.   
7. Financial Implications
7.1. As part of the approval of the new 1,300 additional council home target by Executive
Committee on 30 November 2022, the Council set out the financial implications
associated with the delivery of its Affordable Housing Supply Programme.  This was
based on assumptions relating to the grant levels, council borrowing rates and existing
unit costs using current deign specification and identified that over a 40 year period,
the programme would have a neutral impact to the Housing Revenue Account
Business Plan. 
8. Climate Change, Sustainability and Environmental Implications
8.1. The contents within this report link with key priorities of the Local Housing Strategy,
South Lanarkshire Community Plan and Sustainable Development and Climate
Change Strategy.  As part of the development of these, a full Strategic Environmental
Assessment (SEA) was undertaken with the report submitted to the SEA Gateway and
published online for consultation. 
8.2. This assessment identified that these priorities could make a positive contribution to
local and national sustainability and climate change targets. 
9. Other Implications
9.1. There are no other implications associated with this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Equality Impact Assessment (EqIA) processes were undertaken throughout the
development of the key strategies aligned to this agenda, including the Local Housing
Strategy.  These assessments aimed to identify and mitigate any negative impacts and
seek opportunities to promote equality and found that the strategies would have no
negative impacts on any protected characteristics groups and will have significant
positive impacts in relation to age and disability. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
18 May 2023
51

Page 52

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Good quality, suitable and sustainable places to live 
Previous References
 30 November 2022, Executive Committee, South Lanarkshire Council Housing Supply
Target
 30 November 2022, Executive Committee, South Lanarkshire Local Housing Strategy
2022-27 
List of Background Papers
 South Lanarkshire Community Wealth Building Strategy
 South Lanarkshire Local Housing Strategy 2022-27
 South Lanarkshire Strategic Housing Investment Plan 2023-28 
Contact for Further Information
If you would like to inspect background papers or want further information, please contact:-
Jonathan Read, Strategy and Policy Advisor
Housing and Technical Resources
E-mail: jonathan.read@southlanarkshire.gov.uk 
52

Page 53

Appendix 1
Project 1: Whitlawburn Regeneration, Cambuslang 
Overview
The Whitlawburn masterplan was developed in conjunction with tenants and residents and
funded jointly by South Lanarkshire Council and the Scottish Government.  This development
comprised of 170 new homes for the Council, including 24 amenity flats and 6 amenity
bungalows suitable for older residents or residents with particular needs completed in
October 2022.  A further 60 properties have also been constructed to be managed by West
Whitlawburn Housing Co-operative, due for completion summer 2023. 
Benefits 
Cambuslang based housebuilder CCG Homes was procured by the Council to deliver the
project and due to its scale, resulted in a significant number of community benefits being
delivered.  This included:- 
 establishment of 18 work placements for local people
 utilisation of 6 existing apprenticeships providing additional experience for them
 four apprenticeship completions during course of construction 
 nine Construction Curriculum Support sessions delivered at local schools and
colleges and 4 Small Medium Enterprise (SME) Engagement events and workshops
held 
In addition, a £50,000 community endowment fund was created following agreement
between CCG and the Council to maximise local impact of project.  Consultation with tenants
in the new council homes and existing neighbourhood planning groups was held, with the
fund allocated in line with their preferences.  This includes:- 
 £14,000 directed to the established ‘Our Place, Our Plan’ participatory budgeting
activity, allowing local community groups to access funding for specific projects and
activities
 £5,000 donated to the West Whitlawburn Housing Co-operative led food pantry, to
help them continue to provide free fruit, vegetables and other provisions within the
community
 £1,000 donation to each of St Anthony’s and Loch Primary Schools
 £1,000 has been allocated to the organisers of Cambuslang Summerfest, an annual
event which can be enjoyed by the wider community  
53

Page 54

Project 2: St Joseph’s, Blantyre 
Overview
Comprising 45 new homes, this site is adjacent to the new Blantyre care facility and was
completed in October 2022 by Cambuslang based Cruden Homes.  Alongside 25
mainstream houses and flats, the site contains 20 technology enabled homes equipped with
state of the art telecare systems to help those with additional support needs.   
Benefits
As a result of the new homes being part of the new care facility project, significant community
benefits were delivered.  This included:- 
 three new apprenticeships for local people in heating engineering and plumbing
 one new locally based labourer and 1 new cleaner employed
 attendance at job fairs in East Kilbride and Hamilton
 six South Lanarkshire based SMEs utilised as sub-contractors 
In addition, a community grant of £5,000 was awarded to 5 community organisations, with
£1,000 each provided to Blantyre Community Group, Blantyre Miners Group, Terminal One
Youth Club, Regen:FX and Blantyre Soccer Academy. 
54

Page 55

Project 3: Newton Farm Primary School Extension, Cambuslang 
Overview
Completed in August 2022, the extension to the existing primary school comprised of 8
classrooms to accommodate up to a further 222 primary school pupils from the local
catchment area.  The project cost a total of £4.3million, with South Lanarkshire Council the
lead contributor, covering £3.4million of the capital costs and remaining amount met by the
Glasgow City Region Deal.   
Benefits
Focus within the community benefit package for this project was to maximise training and
employment opportunities for local companies, employed as sub-contractors on the project.
Twelve of 13 contractors utilised for the project were located within 50 miles of Cambuslang
and 4 of these were located within South Lanarkshire.   
Through working with contractors, the project enabled:- 
 4 work placements for local young people over the age of 16
 1 new full time permanent construction job for a local person 
 utilisation of 2 existing apprentices, providing additional experience for them
 completion of 1 S/NVQ in construction for 1 person 
 enrolment in a Leadership and Management training course for 1 person
 enrolment in an Advanced Health and Safety Training course for 1 person 
Each of these benefits aim to contribute to improving employment and skills in the local
workforce whilst also providing income to contribute to the local economy. 
55

Page 56

56

Page 57

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 6 June 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Wealth Building Scottish Government
Consultation 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 present the South Lanarkshire response to the Scottish Government’s recent
consultation on Community Wealth Building (CWB) , which was developed by the
Progress Group on behalf of the Commission 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted
3. Background
3.1. In the Programme for Government 2022/2023, the Scottish Government indicated
that it would hold a consultation on CWB legislation.  The consultation was launched
on 31 January 2023, seeking views on what is required to accelerate and deepen
CWB in Scotland.  The closing date for responses to the consultation was initially set
at 25 April 2023 but this was later extended by 2 weeks to 9 May 2023. 
3.2. At its meeting on 28 February 2023, the Commission agreed that the Progress
Group would develop a South Lanarkshire response to the consultation and that the
response would be submitted on behalf of the Commission once approved by the
Chair.
4. The Consultation
4.1. The key topics within the consultation were whether and in what form, to introduce a
duty to advance CWB; how best to support such a duty and whether there were any
changes to Scottish legislation which could accelerate or support the 5 pillars. 
4.2. In relation to the duty to advance CWB, 3 options were provided as to how this might
work:- 
 option A) a duty requiring Scottish Ministers and prescribed public sector bodies
to embed the CWB model of economic development into their corporate plans
and wider strategies
 option B) a duty requiring those public sector bodies statutorily obliged to be
involved in community planning to produce a collective CWB place-based
strategy and action plan which contains specific actions across the 5 CWB
pillars to advance the CWB model of economic development in their local
authority area.  
7
57

Page 58

(This requirement could be taken forward at a regional level if neighbouring
local authorities and their community planning partners have a preference for
that approach)
 option C) a combined option featuring a union of both options set out above
 “other” or “no duty” were also available as options 
4.3. The South Lanarkshire response supports option A as being the most effective and
proportionate approach.  This option would:- 
 clearly identify the agencies which are subject to the duty
 require agencies to embed CWB within their existing plans and strategies
thereby avoiding an additional layer of plans or bureaucracy
 ensure that all agencies are required to “do their bit” for CWB in their local area
 provide clear lines of accountability 
4.4. The full South Lanarkshire response to the consultation is attached as appendix 1 to
this report.  The response addresses all the questions outlined in the consultation
and supplies suggestions and reflections across all 5 pillars of CWB. 
4.5. The response was compiled from input from members of the Progress Group and
also benefited from the Glasgow City Region draft response which was circulated in
April.
5. Conclusions and Next Steps
5.1. This is a wide-ranging consultation on measures which could have significant
implications for public sector partners. 
5.2. The Commission is asked to note the content of the South Lanarkshire response. 
The Scottish Government aims to issue a summary of analysis of responses
received to the consultation in summer 2023. 
5.3. The development of the legislation following on from this consultation will be kept
under review and future reports on significant developments brought to the
Commission as required. 
6. Employee Implications
6.1. There are no direct employee implications. 
7. Financial Implications
7.1. There are no direct financial implications. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change implications as a result of this report. 
9. Other Implications
9.1. None. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
Paul Manning
Executive Director (Finance and Corporate Resources)
58

Page 59

10 May 2023 
Link(s) to Council Objectives/Values/Ambitions
• Accountable, effective, efficient and transparent 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk
59

Page 60

60

Page 61

Building Community Wealth in Scotland 
Please Note this form must be completed and returned with your response.
To find out how we handle your personal data, please see our privacy policy:
https://www.gov.scot/privacy/ 
Are you responding as an individual or an organisation?   
Individual 
Organisation
Full name or organisation’s name 
Phone number 
Address 
Postcode 
Email Address 
The Scottish Government would like your 
permission to publish your consultation 
response. Please indicate your publishing 
preference: 
Publish response with name 
Publish response only (without name) 
Do not publish response
We will share your response internally with other Scottish Government policy teams who
may be addressing the issues you discuss. They may wish to contact you again in the
future, but we require your permission to do so. Are you content for Scottish
Government to contact you again in relation to this consultation exercise? 
Yes 
No 
South Lanarkshire Community Wealth Building Commission
South Lanarkshire Council
Almada Street
Hamilton
01698 454904  
ML3 0AA
Tom.little@southlanarkshire.gov.uk
Information for organisations:
The option 'Publish response only (without
name)’ is available for individual
respondents only. If this option is selected,
the organisation name will still be
published. 
If you choose the option 'Do not publish
response', your organisation name may still
be listed as having responded to the
consultation in, for example, the analysis
report.
7
61

Page 62

Questionnaire 
Question 1a
We are proposing a duty to advance Community Wealth Building, which form do you
think this duty should take: 
Option A - a duty requiring Scottish Ministers and prescribed public sector 
bodies to embed the CWB model of economic development into their 
corporate plans and wider strategies 
Option B - a duty requiring those public sector bodies statutorily obliged to be 
involved in community planning to produce a collective CWB place-based 
strategy and action plan which contains specific actions across the five CWB 
pillars to advance the CWB model of economic development in their local 
authority area 
Option C - a combined option – featuring a union of both options set out above 
Other 
No Duty
Please provide a reason for your answer.  In your answer please include views on:
• which bodies should be covered by the proposals
• how to best ensure accountability for implementation to the Scottish Parliament 
• how to best ensure the involvement of local communities, business and the third
sector in the implementation of the duty 
South Lanarkshire CWB Commission welcomes the opportunity to comment on CWB
legislation and is supportive of Scottish Government proposals to ensure a long term
and consistent commitment to CWB. 
In terms of the duty to advance CWB, option A is preferred.   
Requiring prescribed public sector bodies to embed the CWB model of economic
development into their corporate plans and wider strategies provides for individual
accountability and also avoids the creation of additional plans and potential complexity. 
The duty (and associated guidance) should seek to stimulate and support agency within
anchor organisations to develop strategies and plans, with associated actions, which are
locally appropriate to build community wealth.  A duty needs to be enabling, rather than
creating an additional layer of bureaucracy.  Legislation should therefore be about
helping those who want to deliver change to be empowered and feel that Scottish law is
supportive. Extra powers, accompanied by appropriate resource, may be preferable to
extra duties.   
Specifying which public bodies are subject to the duty ensures that the relevant bodies
give due regard to CWB within their own sphere of influence and within their operational
activities – rather than suggesting that CWB can be led through or delivered by one or
two partners alone.  Option A ensures responsibility rests on each organisation and
clarifies the expectation that each should play its part to advance CWB. 
62

Page 63

Our preference for option A does not preclude strong support for CWB through CPP
structures and arrangements, taking advantage of the well-established structural,
planning and reporting arrangements in place for Community Planning, including a focus
on disadvantaged localities. It would be reasonable to include within this duty all those
public bodies with statutory obligation to be involved in community planning, without
suggesting that it is a CPP duty. 
In line with the view that there should not be additional burdens, it would be preferable to
embed CWB reporting within existing mechanisms – statutory reporting where this is in
place, or through public performance reporting/public accountability (as is the case with
local authorities and the duty of Best Value).  For example, it should be included within
the Local Delivery Plans for NHS Boards and Strategic Commissioning Plans for
HSCPs. 
Question 1b
One way Scottish Government could support the implementation of the proposed
Community Wealth Building duty is to provide statutory or non-statutory guidance.
Would this be helpful to partners in meeting the proposed duty? 
Yes 
No 
Don’t Know
Please provide a reason for your answer.  In your answer please include views on:
• areas in which it would be helpful for this guidance to focus on, e.g. areas to
consider when implementing the five pillars, links to further support materials
• whether the guidance should be statutory or non-statutory 
We believe guidance is necessary and should be statutory.  It should be clear,
accessible and well-integrated with guidance already in place. 
Statutory guidance would ensure consistency of approach across Scotland and facilitate
integration of CWB into all relevant strategies and policies.  The guidance should seek to
ensure all relevant bodies make equitable and proportionate commitments to support the
implementation of CWB locally. 
However, work is required to establish the points at which existing guidance (and duties)
touch on community wealth building approaches (such as the Fairer Scotland Duty, the
Community Empowerment Act, and Scottish Government Procurement Policy, for
example) and the gaps that could be filled by new statutory or non-statutory guidance. 
Tailored guidance on each of the 5 pillars would be preferable and it would be beneficial
to have guidance which is linked to support materials founded on the experience and
good practice from other areas – in Scotland and internationally. Guidance should be
kept under review by the Scottish Government and updated as required. The guidance
should be sensitive to variations across Scotland and offer public bodies sufficient
flexibility in delivering outcomes to meet the needs of different locales, communities and
economies. 
63

Page 64

It would be helpful for guidance to consider how success is measured in delivering CWB
outcomes.  Proposals for appropriate monitoring frameworks, including pillar specific,
and overarching, indicators would be welcome. 
Question 2a
Are there other non-legislative measures that you believe are required to accelerate the
implementation of the Community Wealth Building approach in Scotland? 
Yes 
No 
Don’t Know
Please provide a reason for your answer. 
While we recognise that CWB relies on anchor organisations using the economic levers
available to them to help foster resilient, inclusive local and regional economies, getting
CWB up and running in a locality may have significant resource implication – in terms of
skills, time, additional workstreams, building relationships, strategizing and planning,
monitoring, etc.  To unlock the full potential of CWB, consideration should be given to
the specific resource requirements and tailored support which would most effectively co-
ordinate and amplify the efforts of anchor organisations in local areas. 
As noted above in relation to guidance, the sharing of best practice and experience
would be useful via case studies, workshops and working groups. In addition, the
sharing of outcomes from the pilot sites would be useful. 
The spend pillar sections of the Scottish Government consultation paper correctly
recognise the key role of the Supplier Development Programme.  This is a well-
established service with considerable and evidenced reach at local, national, and
regional levels.   
The reach of the SDP is ensured by the membership of all 32 Scottish local authorities,
17 other public bodies, and further corporate memberships.  Over 20,000 Scottish SMEs
are registered with the programme, including 655 social enterprises.  Governance
structures ensure appropriate local and regional adaptations in service delivery. 
It would be helpful if other public sector bodies (e.g. NHS boards) could obtain free
access to SDP services or if membership of SDP could be on an area wide basis (and
cover all public sector bodies in an area). 
In relation to the SDP in particular, we would propose that: 
• SDP is further resourced and invested in by Scottish Government as a Scotland-
wide service; promoted as a key source of Community Wealth Building
information, advice, guidance and engagement events for Scotland’s public and
private sectors in relation to the spend pillar; and provided free of charge to all
SMEs and social enterprises; 
• SDP is embedded and engaged in any Community Wealth Building strategy
development work across all relevant Scottish Government functions; 
64

Page 65

• Scottish Government investment is expanded from limited annual grant support to
more secure year on year budgetary support for SDP’s existing remit and to
adequately resource spend-pillar related services to Scotland’s public sector and
private sector primary/larger contractors. 
Other specific suggestions on accelerating CWB spend pillar through the work of the
SDP are: 
• The Scottish Government should work closely with the SDP to better share and
analyse data on contract awards to strengthen evidence of outcomes from SDP
supports – i.e strengthening evidence of the companies using SDP supports
success in consequently winning contracts or accessing frameworks; 
• The Scottish Government should work with and support the SDP to further
increase the attendance and participation of large companies with extensive local
supply chains at ‘Meet the Buyer’ events; 
• The Scottish Government should more clearly define the respective roles and
interdependencies of related Scottish Government supported CWB activities with
the SDP.  Including the Supplier Chain Development Programme, dedicated
national tendering supports to social enterprises, and the supplier engagement
role of Scotland Excel in supporting CWB. 
Other measures which could accelerate the implementation of CWB include: 
• Support for more joined up working between partners, particularly in terms of
procurement and employment. This is necessary at a national and a local level. 
Variations in staffing resource, policies, procedures and systems across agencies
can make having a consistent approach difficult. More effective sharing of
knowledge and resources would build capacity, reduce duplication and enhance
resilience and flexibility. 
• A national social marketing campaign and communications toolkit for local use to
raise awareness of the principles of a wellbeing economy with accessible
language/concepts which highlights the benefits and contributions of all
stakeholders. 
• Influence external funding providers, such as Big Lottery, to align their interests
and funding criteria to the Community Wealth Building effort. 
• Skills development and training to enable SMEs to be involved the delivery of
large scale retrofit projects to achieve net zero by 2045, for example, energy
efficiency measures and decarbonisation projects. 
Question 2b
Are there specific actions required to advance delivery of the items contained within the
Shared Policy Programme outlined on page 11 of the consultation paper?
• ‘working within and developing procurement practices to support local economies,
including Small and Medium sized Enterprises (SMEs) and micro-businesses,
65

Page 66

and improved access to training and labour markets for disadvantaged
communities and individuals. 
• encouraging public kitchens, including school canteens, to source more food
produced by local businesses and organic producers. 
• where possible, to base public sector capital and revenue funding decisions on
targeted social, economic and environmental outcomes’ 
Yes 
No 
Don’t Know 
Please provide a reason for your answer.   
It's not so much encouragement that local authorities need but new systems that allow
SME food businesses the opportunity to participate in local procurement processes.
Food procurement tends to be at scale as this is not only the most cost effective but also
has the logistical processes built in. This is often the biggest barrier for smaller
producers. Procuring at a school level would be resource intensive. Opportunities may
be around developing networks of small businesses working as a cooperative to provide
the necessary scale if they exist. 
The scope to increase local spend is greatly influenced by the availability of local
suppliers that can provide the goods and services required by local authorities. The
comments made in response to Q2a regarding the role, resourcing, and recognition of
the Supplier Development Programme’s role are equally relevant in response to this
question. 
It is important to consider the financial implications of more local spend and the balance
between procurement regulation and delivery of a CWB strategy.  The procurement
rules and guidance could be amended to allow for greater flexibility in delivering local
targeted procurement. However, how would this align with Scottish Procurement
collaborative approach with the emphasis on securing economies of scale and value for
money? 
It is vital that appropriate funding is in place for public sector bodies to discharge their
many functions.  There is a risk that more local procurement comes at additional cost to
the public sector. 
Question 3
Are there ways in which the law could be changed to advance the spending pillar of
Community Wealth Building? 
Yes 
No 
Don’t Know
Please provide a reason for your answer.  In your response you may wish to consider
the stakeholder suggestions outlined in the consultation paper which have arisen from
early engagement.
The procurement rules would need to be amended to allow for CWB. 
66

Page 67

While sustainable procurement duty does support CWB, it does not allow for
procurement limited to local suppliers, as regulated procurements are still subject to
underlying general principles of equality, non-discrimination and openness. 
It would be helpful to see a change in focus of procurement rules for regulated
procurements from collaboration/use of Scotland Excel or other external frameworks to
maximise use of lots to focus on local areas/local business. 
The Scottish Government and Scotland Excel need to consider how to attract local
suppliers to join national frameworks and maximise advertising of sub-contracting
opportunities. 
In addition, there is a need to promote cultural change in approach to procurement -
financial constraints in public sector result in a focus in the use of frameworks and larger
contracts. As noted elsewhere in this response, Increased levels of local procurement
could come at cost to the public sector. 
Simplification of the procurement rules for regulated procurement would minimise
barriers to bidding for contracts while still allowing public bodies to have assurance in
those bidders awarded contracts. A review of the threshold for seeking community
benefits should be considered. This is currently set at £4m although South Lanarkshire
Council have set it at £50k. 
Guidance / policy is required on the development of local supply chains with SMEs and
particularly amongst social enterprises in localities where the sector is not as strong or
well developed as in other localities. A better understanding within anchor organisations
of what the realistic requirements are to make SMEs / SEs ‘tender ready’ to allow them
to access supply chains cannot occur without significant and ongoing capacity building.
This is currently supported by the Supplier Development Programme across local
authorities.  (Our comments on SDP in response to Q2a above are also relevant here.) 
It would be helpful to see measures which would strengthen the role of social housing
providers to employ local supply chains in their business. 
More generally, there is an opportunity in the move to net-zero to provide social
enterprise capacity at scale to meet future needs in the green economy. 
Question 4
Employment law is reserved to the UK Parliament. Are there other devolved areas
where the law could be changed to advance the workforce pillar of Community Wealth
Building? 
Yes 
No 
Don’t Know
Please provide a reason for your answer. In your response you may wish to consider the
stakeholder suggestions outlined in the consultation paper which have arisen from early
engagement. You may also wish to consider areas that the Scottish Government could
work with the UK Government on if you have proposals regarding changes to the law
which remain reserved to the UK Parliament. We will cross-reference to responses
received as part of the Fair Work Nation consultation which was held in 2021.
67

Page 68

Ensure Fair Work practices are embedded in all projects which are being funded from
the public purse. 
Legislating for the inclusion of local and sustainable supply chains in public contract
documentation would encourage development of local businesses and suppliers. The
weighting in any price/quality split for evaluation of tenders could include a higher
scoring where local contractors or suppliers are utilised. There could be statutory targets
for the number of apprentices employed each year. 
More progressive recruitment should be looked at for public sector agencies, unlocking
more flexible ways to recruit.  National policies and systems can restrict this, e.g,. within
the NHS. More outreach work is needed and a requirement for agencies to report on
what they are doing across this pillar. Focus on anchor organisations having an
employability strategy and getting support from Scottish Government to prioritise this. 
Question 5
Are there ways in which the law could be changed which are not already covered in the
proposals for the Land Reform Bill to advance the land and property pillar of Community
Wealth Building? 
Yes 
No 
Don’t Know
Please provide a reason for your answer. In your response you may wish to consider the
stakeholder suggestions outlined in the consultation paper which have arisen from early
engagement.
Efforts are being made to address vacant and derelict land and property through
different strands of activity being undertaken by local authorities and their partners and,
irrespective of any legislative change, councils will continue to work with landowners to
enable the reuse of land and property. 
However, there needs to be a significant increase in funding provided by Government to
local authorities to support them to bring vacant and derelict land sites back into use. 
The new National Planning Framework (NPF4) will require planning applications to be
health impact assessed as well as local Development Plans to incorporate consideration
of a range of health and wellbeing issues.  It would be helpful if the tools/plans
developed in support of this have the CWB principles threaded through. 
Consideration should be given as to how statutory requirements for local authorities set
within the new Local Heat and Energy Efficiency Strategies can be supported through
Community Wealth Building. For example, incentivising those building owners making
the transition to decarbonised heat sources to use local SMEs to do so. 
Consideration should also be given to mechanisms which strongly incentivise private
property owners, particularly remote institutions, to invest in their property assets and
evidence commitment to pro-active asset management. Failure to do so should trigger
an option for communities to take over vacant, underutilised property. 
68

Page 69

Finally, a Community Wealth Building approach to retrofitting energy efficiency
measures to our housing stock and non-domestic buildings could bring significant
benefits. Using our influence to develop the retrofit supply chain, we could create
millions in direct Gross Value Added (GVA) for the local economy and also create
thousands of jobs for local people in the local community. 
Question 6
Are there ways in which the law could be changed to advance the inclusive ownership
pillar of Community Wealth Building? 
Yes 
No 
Don’t Know
Please provide a reason for your answer. In your response you may wish to consider the
stakeholder suggestions outlined in the consultation paper which have arisen from early
engagement. You may also wish to consider areas that the Scottish Government could
work with the UK Government on if you have proposals regarding changes to the law
which remain reserved to the UK Parliament.
The ideas put forward in the consultation paper (from engagement so far) all seem
sensible.  Start-up Social Enterprises can’t always demonstrate income streams or
prove sustainability, and we would like to see support for mechanisms which can make it
easier for social enterprises to access some form of security against investment, e.g.,
public investment such as the Affordable Credit Fund. 
South Lanarkshire Council are delivering a new community pilot to test the effectiveness
of this model, investing in socially useful and economically viable initiatives, aimed at
strengthening social enterprise delivery.  This funding will not only provide investment
but also strengthen social capital in the local areas where the pilots are located, giving
financial reasons for communities to engage more fully with local organisations with the
potential to become citizen investors. 
Sustainable long-term funding is key to enabling local economies to thrive.  The Scottish
Government should move away from the practice of packaging up small funding pots,
remove ring-fencing and move to long term funding model devolved to Local Authorities. 
As noted under “land and property” (Q5) above, consideration should be given to
measures which would compel private landlords and distant institutions in particular to
offer assets they are not actively managing and investing in to local groups, bodies,
communities. 
Options should be looked at to unlock opportunities which may arise at the point when
SMEs are considering ceasing to trade, e.g., through retirement of owners – creating
conditions which allow for employees to take a stake in the business and potentially
transition to employee an employee ownership model. 
Question 7
Are there ways in which the law could be changed to advance the finance pillar of
Community Wealth Building? 
Yes 
No
69

Page 70

Don’t Know
Please provide a reason for your answer. In your response you may wish to consider the
stakeholder suggestions outlined in the consultation paper which have arisen from early
engagement. You may also wish to consider areas that the Scottish Government could
work with the UK Government on if you have proposals regarding changes to the law
which remain reserved to the UK Parliament.
The aim of the Finance pillar is to increase flow of investment within local communities,
harnessing wealth that exists locally.   Examples given include credit unions, community
development finance institutions (CDFIs), social investment and responsible investment.   
The consultation document notes early on that, as financial regulation is a reserved
matter, there is limited scope for legislative proposals in this area. 
Stakeholders have suggested encouraging investment funds from, e.g., pensions to be
directed to build local wealth, or giving credit unions and CDFIs greater recognition. 
They also mention establishment of community banks. 
For all of these potential focus areas, there needs to be a clear-sighted view of what can
and cannot be achieved, particularly in light of the legislation and regulations that we
cannot affect (such as Finance regulations, and potentially pension regulations).  Those
constraints would appear to effectively define the limits of what can be achieved in this
area. 
Any changes to laws or guidance to further advance CWB also needs to consider risks,
and who would bear these.  Inherent in any funding or investment opportunity is risk of
loss, and protections need to be considered for those who bear the risks (most likely
through Financial Conduct Authority’s work).   In the current climate, some credit unions
are finding times tough, some are failing, and there would be significant limitations (both
legally and financially) on the level of support that local authorities could provide.  With
the cost of living crisis squeezing finances across the board, risks will be higher.   
More generally, ensuring the CWB principles are built into funding criteria wherever
possible would be a positive measure.  For example, ensuring that national investment
funds are more locally and evenly targeted and awarded through local partnerships, as
opposed to a national competitive process which leads to a lack of parity across
localities. 
70

Page 71

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 6 June 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Wealth Building Action Plan: Q4 Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 present the Q4 progress update on the Community Wealth Building (CWB) Action
Plan 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted
3. Background
3.1. The Commission approved the 2022/2023 CWB Action Plan at its meeting on 6
September 2022. 
3.2. This report presents at update on the actions contained within the Action Plan for the
12 month period April 2022 to the end of March 2023.
4. Progress Update
4.1. In line with the reporting arrangements for other key plans and strategies, the CWB
Action Plan has been uploaded to the performance reporting system Improve. 
4.2. There are 84 actions within the CWB Action Plan for 2022/2023.  Progress to date
against these actions is shown in the CWB Quarter 4 Performance Report
2022/2023, attached as appendix 1.   
4.3. This report uses a traffic light format with the following definitions to give a status
report on each measure:- 
Status Definition
Blue Action complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
8
71

Page 72

4.4. The overall summary of progress to date is as follows:- 
Status Actions
Number %
Blue 13 15%
Green  67 80%
Amber  3 4%
Red  0 0%
Report later 1 1%
Totals  84 100 %                             
(Data correct as at 24 May 2023) 
4.5. Of the 84 actions, 13 are complete and will be removed from the Action Plan.  The
remaining actions will be reviewed and a refreshed Action Plan will be brought to the
September meeting of the Commission. 
5. Employee Implications
5.1. There are no direct employee implications. 
6. Financial Implications
6.1. There are no direct financial implications. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change implications as a result of this report. 
8. Other Implications
8.1. None. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
16 May 2023 
Link(s) to Council Objectives/Values/Ambitions
• Accountable, effective, efficient and transparent 
Previous References
• CWB Commission Report – CWB Action Plan 2022 Refresh 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk
72

Page 73

IMPROVe - SLC Performance Management System                                                                                                                         Report printed on 25 May 14:49
Quarter 4 : April 2022 - March 2023
(This represents the cumulative position to March 2023)
Performance Report 2022-23
Community Wealth Building - Plan
8
73

Page 74

Summary - number of detailed actions complete, green, amber and red under each Community
Wealth Building Pillar
Community Wealth Building Pillars Complete Green Amber Red Report later Total
Spending 6 20 0 0 1 27
Workforce 0 15 0 0 0 15
Land and property 1 15 3 0 0 19
Finance 1 8 0 0 0 9
Building the generative economy 5 9 0 0 0 14
Total 13 67 3 0 1 84
Page 2
74

Page 75

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
Provide support to local
sectors based on an
assessment of current
capabilities ensuring
support from Supplier
Development
Programme.
Deliver training events on public sector procurement for
relevant contracts
SLC co-hosted the following SLC specific events with Supplier
Development Programme:
07-Jun-22Meet the Contractor - Morrison Construction
23-Aug-22Talking Tenders with South Lanarkshire Council
27-Sept-22 Talking Tenders with Scotland Excel for the Property,
Maintenance and Refurbishment Framework
24-Nov-22 Talking Tenders with South Lanarkshire Council
15-Dec-22 South Lanarkshire Council Supplier Engagement Event:
Roads and Infrastructure Framework
30-Jan-23 South Lanarkshire Council Supplier Engagement Event:
Roads and Infrastructure Framework
06-Apr-23 South Lanarkshire Council & Social Enterprises: A
Conversation about Public Sector Contracts
We also co-hosted a Meet the Real Buyer event in Feb 2023. There
were 632 registrations for the event, 337 of whom attended on the day,
this is a very impressively attendance rate for such an event. Of those,
attendees 200 unique Scottish SME businesses were represented on
the day. 78 of these SMEs were based in South Lanarkshire Council
and 46 were based in North Lanarkshire.
Green
Completion of a gap analysis of current capabilities. Supplier engagement survey undertaken with South Lanarkshire
business. Analysis completed with results and next steps to be
presented to the CWB Progress Group and Commission.
Green
Review of the range of support provided to those markets
and identify measures to increase capability.
Feedback from the supplier engagement survey and from Meet the
Real Buyer will help inform how support is delivered going forward.
Green
Increase the level of spend with local companies Information for 2022/23 not available until June 2023. Report Later
Increase the number of registrations with Public Contracts
Scotland tendering portal
There has been an increase in PCS registrations since November
2022 from 1,275 to 1,501.
This equates to a 17.8% increase.
Green
Page 3
75

Page 76

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
Increase the number of registrations with Supplier
Development Programme
Registrations have increased by 131 and is promoted through
Economic Development business engagement and by SDP through
events and social media.
Green
Increase the contracts awarded to local companies Positive engagement with local companies and social enterprises with
the Supplier Development Programme in 2023 include: national Meet
the Buyer in May 2022, pan Lanarkshire Meet the Buyer event in
February 2023, Social Enterprise engagement event March 2023 and
a Talking Tenders for Quick Quotes in November 2022.
Green
Assess local markets,
their existing capacity
and willingness of
business to grow
together with the
identification of
appropriate contract
opportunities.
Complete local market analysis to identify opportunities for
local growth working with the Lanarkshire Economic
Development Forum.
LEF Business Group have been briefed on extension of scope of
Quick Quote and encouraged to promote Meet the real Buyer events
and to share with business networks in order to increase interest in
contracting with South Lanarkshire Council.
In addition, Business Gateway have been encouraged to promote
potential business opportunities from future health and social care
requirements.
Discussions with LEF partners, University of West of Scotland, South
Lanarkshire College, New College Lanarkshire have all taken place,
requesting spend information with offer of assistance to analyse spend
and to help identify local, alternative suppliers.
The future of LEF is under review
Green
Encourage local suppliers to bid for Scotland Excel contract
opportunities
Concerted marketing campaign including daily social media posts,
cascading of details to all relevant partner organisations and direct
emailing to relevant businesses for the Scotland Excel Property,
Maintenance and Refurbishment and Roads and Infrastructure
Frameworks has been taking place.
Webinar for the Maintenance and Refurbishment framework took
place on 27 September 2022 and a face to face event for the Roads
and Infrastructure Framework took place on 15 December 2022, this
was followed by a webinar on 30 January 2023.
Green
Page 4
76

Page 77

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
Promote the council’s contract register and annual report
pipeline as a source of information to interested parties
Hundreds of posts on meet the buyer events and SDP/SLC face to
face and virtual events/webinars that would drive suppliers to register
in a much more informed way.
Green
Manage the pipeline of projects utilising the flexibility
provided by new Quick Quote process
Housing and Property Services advise that Universal School Meals
projects will provide opportunities for Quick Quotes to be obtained
from local contractors.
Green
Complete a Market Capacity Assessment to understand the
capability of the food and drink sector to supply food and
drink to the council
The analysis on the capability of local food and drink businesses to
supply food to the different council buyers was carried out from July to
October 2022 with consultations with council services, local
businesses and external partners. A report will be presented to the
Climate Change Committee on 20 September 2023 outlining work
done to date in relation to report recommendations.
Complete
Page 5
77

Page 78

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
Assess those
procurement
opportunities where
pre-market engagement
would be considered
beneficial.
Utilise support from Supplier Development Programme to
facilitate pre-market engagement, using their marketing and
social media channels, plus webinars and early engagement
events.
While SDP continue to deliver their ongoing portfolio of training events,
SLC co-hosted the following SLC specific events with them:
07-Jun-22Meet the Contractor - Morrison Construction
23-Aug-22Talking Tenders with South Lanarkshire Council
24-Nov-22 Talking Tenders with South Lanarkshire Council
15-Dec-22 South Lanarkshire Council Supplier Engagement Event:
Roads and Infrastructure Framework
30-Jan-23 South Lanarkshire Council Supplier Engagement Event:
Roads and Infrastructure Framework
06-Apr-23 South Lanarkshire Council & Social Enterprises: A
Conversation about Public Sector Contracts
We also co-hosted a Meet the Real Buyer event in Feb 2023. There
were 632 registrations for the event, 337 of whom attended on the day,
this is a very impressively attendance rate for such an event. Of those,
attendees 200 unique Scottish SME businesses were represented on
the day. 78 of these SMEs were based in South Lanarkshire Council
and 46 were based in North Lanarkshire.
Green
Maintain liaison with Tier 1 contractors to promote SME
engagement for sub-contract opportunities and, where
possible, obtain details of successful awards
Preparations continued for the Build Lanarkshire Programme
commencing 3 May 23 and will run for eight weeks.
All eight events held in Tier 1 premises with presentations from Tier 1
buyers regarding what opportunities will be coming up and onboarding
procedures.
We also supported a Morrisons Meet the Contractor Event on 7 June
2022
Green
Use a range of
communication methods
to advertise
Conduct supplier events and increase the use of social
media.
The wide range of engagement events were marketed heavily through
social media channels, namely Twitter, Facebook and Linkedin.
Green
opportunities to potential
bidders.
Supplier Development Programme to raise market
awareness of opportunities using their marketing and social
media channels, plus webinars.
SDP promote all supplier engagement opportunities via their social
media channels- LinkedIn, Facebook and Twitter. Training webinars
also promoted via social media.
Green
Page 6
78

Page 79

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
Review sustainability
requirements for
Review the scope and scoring of sustainability requirements
in contracts to maximise environmental benefits.
Revised approach to Sustainability Scoring in tenders effective from
April 2023.
Complete
contracts Implement the Flexible Framework Sustainability action plan
to further embed good procurement practice.
Flexible Framework reviewed at 31 March 2023 and sustainability
outcomes continue to be considered in all tender processes.
Green
Identify those anchor
organisations willing to
participate and promote
contract opportunities to
local SMEs and social
enterprises
NHS Lanarkshire will work with SDP as part of a short-term
supply chain diversity project to encourage a wider pool of
suppliers, support more local SMEs to become suppliers,
and will focus in particular on increasing diversity.
A series of three engagement events were facilitated by SDP on behalf
of NHS Lanarkshire; these included Talking Tenders with NHS
Lanarkshire (214 bookings and 168 attendees), NHS Supply Chain
Partner Engagement event (37 bookings/26 attendees) and a bespoke
NHS Tender Training event, Electrical and Plumbing Framework (18
booked/9 attended). Outcomes will be reported later when the
evaluation report has concluded.
Complete
Review of the changes
to delivering increased
levels of community
Review the scope of the community benefits menu and
minimum scoring to identify opportunities for improving the
gain for communities.
Updated Community Benefits points menu effective from April 2023. Complete
benefits and
identification of new
opportunities to improve
community outcomes
Identify specific community benefits that can be delivered
from contracts that can support communities.
The Community Wish List webpage was launched in March 2023 and
initial enquiries logged. Community Wishlist and Benefits officer have
joined the working group developed by the City Deal team looking at
community wishlists across the region
Green
NHS Lanarkshire will support and encourage the use of the
National NHS Scotland Community Benefits Portal
NHSL continue to promote the National community benefits portal and
attend the national meeting. NHSL have had 8 community needs
uploaded, and so far 2 have been picked up and delivered. Focus this
year will be on encouraging more suppliers to use the portal.
Opportunities for joint working with SLC are also to be explored.
Green
Consideration of the
changes that could be
made to the way
contractual opportunities
are presented to the
Provide a Local Spend update. A local spend update report was provided to the meeting of the
Commission on 6 September 2022. The report included an update on
local spend performance, analysis of the construction sector in SLC
and NLC and outlined a number of next steps in support of the delivery
of the Community Wealth Building objectives under the Spend Pillar.
Complete
market and evaluated in
support of community
wealth building
objectives
Report on the progress of the new Quick Quote
arrangements
An update on the use of quick quote was provided to the meeting of
the Commission on 6 December 2022. The report provided an
overview of the quick quotes that have been carried out, the
experience of South Lanarkshire based companies taking part, the
engagement activity that has been taking place and further
development work.
Complete
Page 7
79

Page 80

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Spending
High level action Detailed actions Comments/Progress Status
Review the contract evaluation criteria for regulated spend. Recommendations to be presented to the next spend pillar working
group for discussion.
Green
Identify the spend in scope based on the requirements of the
procurement regulations, reflecting changes to standing
orders and evaluation criteria.
Route to market considered for each tender opportunity to ensure local
opportunities.
Green
Identification of local contract opportunities where viable
local markets exist based on changes to standing orders and
evaluation criteria.
Property Services confirm Universal School Meals Projects will provide
opportunities for Quick Quotes to be obtained from local contractors. In
addition, the Community Benefits menu promotes the use of the local
companies as sub-contractors and local apprenticeships.
Green
Workforce
High level action Detailed actions Comments/Progress Status
Ensure that all Anchor
organisations including
South Lanarkshire
Council have adopted
the Living Wage as well
as Living hours and fair
work practices
We will continue to advocate the Living Wage and work on
developing living hours along with our Community Planning
Partners and Anchor Organisations
The pan Lanarkshire Living Wage Campaign Group meets quarterly to
ensure focus in this key area. Currently there are 149 Living Wage
employers in South Lanarkshire and 123 in North Lanarkshire.
Green
Support our local
businesses to create fair
working practices
Continue to ensure that all businesses and third sector
organisations who engage with the Council are encouraged
to adopt the Living Wage and a fair work approach to
employment practices.
Colleagues in Economic Development are engaging with all employers
to encourage them to pay the Living Wage.  Liaising with partners
such as Skills Development Scotland and Routes to Work South.
Continuation of the Pan Lanarkshire Living Wage Accreditation
discount scheme was agreed in this quarter, supporting employers to
become accredited.
Green
Page 8
80

Page 81

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Workforce
High level action Detailed actions Comments/Progress Status
Provide webinars and support to understand impact of Fair
Work, for employers and communities.
The Pan Lanarkshire Living Wage group received an update from
DWP on In Work Progression and the offer of support available from
job centres during this quarter.
Green
We will improve the
percentage of applicants
from South Lanarkshire
SIMD areas who secure
work with Living Wage
accredited employers
Our employability projects will work with managers to identify
pre employment training and skills required for entry level
jobs as well as building on existing work to prepare our local
residents for interview and improve their employability.
The employability team along with colleagues from operation
personnel have collaborated to create an employability pipeline which
creates opportunities for residents and local communities.
We had our first Recruitment Fair in August 2022.  This fair provided
us with a template which attracted a mix of long term unemployed and
employed clients who were looking for a change of career and this has
resulted in 53 interviews and 29 job offers.
The fair provided us with several learning points, which included a
more tailored approach to geographical area and posts available.
Our second Recruitment fair in February 2023, has increased our
conversion to application from those who attended, with 75% of job
seekers completing applications in Feb 23.
Green
We will continue to
deliver employability
programmes which help
local residents into work.
We will map the extent of employability support with partners
- identifying strengths, gaps and areas for development.
The Council has a range of well-established employability services,
delivered in partnership across Education, Corporate Resources and
our third sector partners. NOLB makes a key contribution to support
this activity and has supported additional activity during 2022/23. It is
likely that the funding priorities for 23/24 will change significantly with
an increased focus on parental employability support
Green
Page 9
81

Page 82

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Workforce
High level action Detailed actions Comments/Progress Status
Work with our own
services and public and
private sector partners
to identify the skills they
need to grow and create
wealth in the local
economy
We will work with our own services and with partners on our
Local Employability Partnership, local business organisations
including Federation of Small Businesses and Lanarkshire
Chamber of Commerce. The purpose is to consult with these
communities – gathering data on their immediate as well as
future skills needs. We will develop existing relationships
with Scottish Enterprise, Business Gateway and Skills
Development Scotland to ensure that up to date labour
market and demand led data is informing our plans and
developing our skills and knowledge training
SDS’ Careers Review has been published and can be accessed at the
link below
career_review_final_report_230306_final.pdf
(skillsdevelopmentscotland.co.uk)
LEP partners continue to work together to plan activity in response to
labour market conditions and to respond to emerging gaps in service
delivery. Partners are awaiting confirmation of funding for 23/23,
following which a delivery plan will be agreed.
Green
Be responsive to
business and Social
Enterprise needs
We will further develop our Upskilling programme to ensure it
is meeting demand led skills requirements and qualifications
from local SMEs and Social Enterprises in particular.
We remain focused and continue to engage with local businesses to
support employees through our Upskilling project.
To date we have supported 49 businesses, 44 employees have
completed their qualification during the year and there are 97
employees currently undertaking a recognised qualification in areas
Health & Social Care, Child Care, Warehousing, Distribution &
Logistics, and creative industries.
Green
We will work with new businesses to ensure residents are
upskilled prior to launch date through pre-employment
training and employability support.
We have continued to deliver a range of pre-employment training
opportunities including in HGC and LGV through our delivery partner
Routes to Work South and in partnership with DWP to support
progression to employment in the care sector.
Green
Promote the Council as
an ‘Employer of Choice’
highlighting our
excellent Terms and
Conditions and
opportunities for flexible
working.
Build on work ongoing with Targeted recruitment in
Employability Services, ensuring that applicants are
supported to apply for SLC vacancies as well as receiving
pre-employment training where required. Use available
funding to support job opportunities for local people within
council.
We continue to support local Homecare providers who deliver services
on behalf of the council by promoting vacancies and linking
opportunities to employability client.
We have upskilled 57 employees in Health & Social Care qualifications
through our Upskilling project.
Green
Page 10
82

Page 83

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Workforce
High level action Detailed actions Comments/Progress Status
Continue to support
local residents and
businesses through our
extensive employability
programme of support
We will continue to work with local companies and residents
to ensure we reach the best fit of local vacancies to skills.
Investing in training and employability support where
required.
We have continued to deliver employer engagement activities with
RTWS.
2022/2023 Programmes such as Making it Work has had 58
registrations.
21 job outcomes
66 training outcomes
Green
Identify suitable Modern
Apprenticeship
opportunities within the
Council over next 2-5
years
Work with Resource workforce plans to identify numbers and
MA occupational areas, and build on MA frameworks to
create training which meets the needs of SLC.
Our established Modern Apprenticeship programme currently has 184
in training and the breakdown of occupational areas is shown below:
Construction and construction technical 493 and 4 year
programmes
Business and administration232 year programme
Child care272 year programme
Social care282 year programme
Digital Apps and IT Support361 to 2 years (staff and new
MA’s)
Road Workers 42 year programme
Housing Assistant 52 year programme
Youth work122 year programme
In addition to the above numbers, recruitment campaigns are
currently live for 4 additional Road Workers and up to 12 Social Care
Modern Apprentices, who once recruited, will start in April 2023.
Green
Engage with SDS to
agree MA priorities at
national and local level
Modern apprenticeship opportunities a standing item for
discussion at local employability partnership meetings.
This item is a standing agenda item at our Local Employability
Partnership meetings. We have recently explored options with SDS at
a local and national level regarding shared apprenticeships with NHS
Lanarkshire. this work continues.
Green
Page 11
83

Page 84

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Workforce
High level action Detailed actions Comments/Progress Status
Work with Education
Resources to identify
suitable Foundation and
Modern Apprenticeship
journeys
Monitor progress of Foundation apprenticeship candidates
who are ready/suitable for Modern Apprenticeship
opportunities. Put in place any additional supports required.
Education Resources have developed a new model of delivery for
Foundation Apprenticeships which includes expanding the FA
consortium to New College Lanarkshire. All FAs have a linked
Vocational Development Worker,  who supports individual pathway
planning. This might include into a related Modern apprenticeships if
appropriate and all FA's are able to apply and be interviewed for MAs if
they wish.
We delivered a pilot programme to support 5 Care experienced young
people into Council Apprenticeships and have shared the learning
from this with colleagues.
Green
Review the funding
streams available to the
Council to support
training including
Modern Apprenticeships
Examine the terms and conditions of these funding streams
to identify best option for funding or part-funding Modern
Apprenticeship programmes and other training opportunities
Current funding arrangements for MAs allow each to be matched into
a budgeted vacancy at the earliest opportunity. we pay the Living
Wage to all MAs and have raised the inequity of the national
apprenticeship wage with SDS nationally.
Green
Put in place options for
trainee positions
including modern
apprenticeships using
workforce plans and
funding criteria to
maximise effectiveness
Use different funding streams to leverage best available
options for sustainable traineeships. Link to work with DYW.
MA recruitment is linked to all Council Workforce plans.
DYW reps are on the LEP and the Foundation Apprenticeship
Consortium
Green
Land and property
High level action Detailed actions Comments/Progress Status
Increase the supply of
affordable housing
across South
Deliver the Strategic Local Programme Agreement (SLPA) Following monitoring throughout the year, RPA was reduced to a final
prediction of £12.794m spent due to some slippage in programmes.
Final claims of £10.45m achieved.
Green
Lanarkshire Preparation and approval of the Strategic Housing
Investment Plan (SHIP).
SHIP developed and approved at committee on 5th October 2022. Green
Page 12
84

Page 85

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Land and property
High level action Detailed actions Comments/Progress Status
Implement policy on affordable housing in new private
developments in Local Development Plan 2
The assessment of applications for new residential development
include consultation with colleagues in Housing Services in relation to
affordable housing requirements. This can involve on site provision or
the payment of a commuted sum depending on the circumstances of
each case. This is in accordance with the adopted Local Development
Plan and Supporting Planning Guidance on developer contributions.
Green
Identify and purchase
appropriate properties to
Specific content within SHIP approved in relation to Open
Market Purchase Scheme.
The Open Market Purchase target was set of 60 units for 2022/23 Green
meet specific housing
needs
Target of 67 properties purchased through Open Market
Purchase Scheme for 2021/22.  have yet to agree what the
target is for OMPS within 2022/23.
Target of 60 OMPS was set for 2022/23, 57 acquired. 2 further
properties identified, however settlement delayed into 2023/24.
Amber
Continuous assessment
of regeneration priorities
as part of Local Housing
Strategy process.
Considered as part of annual review of Local Housing
Strategy.
The final phase of the housing led regeneration of Whitlawburn,
Cambuslang is now completed with the latest tenants moving into new
properties to be managed through West Whitlawburn Housing
Co-operative.
Actions to consider future regeneration opportunities by the council
and its Registered Social Landlord partners are being considered as
part of the new South Lanarkshire Local Housing Strategy 2022-27,
approved by the council's Executive Committee on 30 November
2022. This includes the role of housing within the regeneration of town
centres across South Lanarkshire.
Green
Identified priority projects included as part of SHIP
development.
Priority of Low, Medium or High set against all SHIP projects Green
Ensure priority projects are included as part of the
preparation of the next Local Development Plan 3
Close working with colleagues in Planning to ensure sites reflected
across corporate documents.
Green
Continue to target
long-term empty homes
to bring them back into
Establish a Matchmaker Scheme to link empty properties
with interested buyers.
Work commenced with other council services and the Scottish Empty
Homes Partnership to develop a matchmaker scheme for South
Lanarkshire.  Scheme to be launched summer 2023.
Green
effective use and
contribute towards
meeting housing needs
Set up an empty home grant scheme providing financial
support for owners to improve property condition.
Review of existing Empty Homes Grant Funds to inform options for
consideration for South Lanarkshire. Grant Scheme to be launched
during 2023/24.
Green
with a target of 15 set
for 2021/22.
Provide practical advice and assistance to empty property
owners.
Strategy and Policy Officer (Empty Homes) continues to deliver
practical advice and assistance to any enquirer contacting the council.
Green
Page 13
85

Page 86

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Land and property
High level action Detailed actions Comments/Progress Status
Provide direct support to
applicants
A Community Asset Transfer Development Officer has been
recruited and will promote and support the asset transfer
process
Community Asset Transfer Officer appointed on a 2 year contract until
March 2024
Complete
Community Asset
Transfer to be promoted
to communities across
South Lanarkshire
Process for promotion of Community Asset Transfer to be
agreed
CAT process has been refined with online support pages and Learn on
Line training module launched. CAT process has been promoted with
VASLan and presented to Third Sector Locality Networks. CAT
process also presented to all Area Committees. Specific session held
with SFA and football teams across South Lanarkshire in February
Green
Continue to improve the
energy efficiency of the
Council’s housing stock
contributing towards
national climate change
ambitions
The Housing Investment Programme will continue to
incorporate sustainable changes to the Council’s housing
stock, working towards increasing the number of properties
that meet the Energy Efficiency Standards for Social Housing
2 (EESSH2). A target of 10% has been set for 2022/23.
As reported to the council’s Executive Committee as part of the Capital
Programme Monitoring reports throughout 2022/23, the Housing
Investment Programme has been subject to delays due to a variety of
external factors. This includes the discovery of roosting bats within
buildings prior to work commencing and the extreme weather
experienced in December 2022, which caused flooding damage to a
number of Council properties and operatives from Property Services
have been diverted away from energy efficiency works to tackle urgent
repairs.
In relation to EESSH2, the Scottish Government are continuing to
review the standards and timescales associated with this and the
council await further detail prior to recommencing performance
reporting.
Amber
Continue to implement
energy efficiency
measures across
council facilities
Deliver a range of projects as part of the Community Energy
Efficiency Fund programme.
The majority of the projects on the programme have now been
delivered. However the Solar PV panel installations proposed for
Calderwood and High Blantyre primary schools will now be completed
in 2023/24 following delays in the supply of materials.
Amber
including investment in
renewable energy
solutions and low/
zero-carbon heating
Reduce embodied carbon from construction (new builds and
refurbishment)
Design Process is constantly reviewing opportunities to reduce Carbon Green
Page 14
86

Page 87

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Land and property
High level action Detailed actions Comments/Progress Status
Continue to maximise
Energy Efficient
Scotland funding to
support owners and
private rented properties
Work with partners, including Home Energy Scotland, to
provide advice and support to owners and private landlords
on funding opportunities available to them.
Housing and Technical Resources continues to work with partners to
support homeowners and private landlords to improve energy
efficiency within their properties. Recently, this includes sharing
opportunities for funding and updates to environmental legislation at
the Resources own Virtual Private Landlord Forum in Spring 2023,
with over 60 landlords from across South Lanarkshire in attendance.
Green
Take the “20-minute
neighbourhood” concept
into account when
planning capital
schemes.
Use 20 minute neighbourhoods” as a key scoring criteria
when assessing bids for UK, Scottish Government and
Council funded capital schemes
20 Minute neighbourhoods is now imbedded in the assessment
process for funding bids as part of a wider assessment structure.
To date there has not been a round of suitable funding bids assessed
since this inclusion of this measure.
Green
Engage with public,
private and voluntary
sector partners to marry
-up aspirations and pool
funding to add value and
deliver one-stop service
provision
Ensure cross sector- partners are aware of planned projects
and opportunities for collaboration
Through the development of the Social Enterprise Strategy and
complementary accelerator programme etc there has been extensive
dialogue on furthering knowledge and participation in opportunities for
collaborative working.
Green
Finance
High level action Detailed actions Comments/Progress Status
We will look to approach
the pension fund to
explore further
opportunities for
investment in local
areas. Other councils ,
with a similar interest,
may wish to make a joint
approach
Through officers initially, we will approach SPF to ask for
options to be considered for opportunities for local
investment. Considerations to be developed along side SPF
following initial discussions of possible areas.
In relation to investment by SPF we have had communication with
them around how they invest, in particular how they invest with
councils.
They have a Direct Impact Portfolio that they point to around a more
local impact investment portfolio This isn’t however a pot of funds that
can be “bid” for.
will continue to look at what other councils are doing in this area
Green
Establish working
relationships with CUs
and community partners
to promote savings and
Engage with Credit Unions to establish shared priorities and
linkages to CWB Strategy
CET Officer appointed to engage with CUs across South Lanarkshire.
Engagement successful and CUs are now part of the Financial
Inclusion Network and working on various initiatives to improve and
increase awareness of CU services
Green
Page 15
87

Page 88

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Finance
High level action Detailed actions Comments/Progress Status
affordable credit Establish a Credit Union Network SL Credit Union Network has been re-established and regular
meetings held to link CU activity to CWB process
Complete
Develop and promote new financial services to communities Discussions are now ongoing with the CU Network to look at new
financial models for CU activity. CUs have been fully involved in
Financial Inclusion Network and linkages made to Supplier
Development Programme and other procurement initiatives.
Green
Run “shop and spend
local “campaigns to
increase awareness of
locally available goods
and services
Through economic and tourism strategies develop additional
marketing and networking opportunities for local businesses
and social enterprises
Ongoing engagement with Tourism sector, promoting Tourism Strategy,
business support and marketing opportunities with a view to
developing relationships short term and establishing a formal
networking group in due course. South Lanarkshire Social Economy
Steering Group established to encourage collaboration and support
Social Enterprises with marketing and Networking.
Green
Via our Business Gateway contractor and our business
grants programme ensure that local companies have the
knowledge and funding to run and develop effective
promotional and social media campaigns
Business Support grants application process and engagement with
local Business Gateway encourages applicants and clients to attempt
to source goods and services locally, quotations from suppliers outwith
area are queried and applicants asked to justify where local suppliers
not used.
Green
Encourage local trading networks Local trading is promoted through networking events- examples
include Lanarkshire Business Hub, Social Economy Steering Group,
Tourism and Food and Drink sectors collaboration, Business
Improvement Districts
Business Support grants application process and engagement with
local Business Gateway encourages applicants and clients to attempt
to source goods and services locally, quotations from suppliers outwith
area are queried and applicants asked to justify where local suppliers
not used.
Green
Case-study local businesses via our website and the local
press
Series of case studies has been, and will continue, to be developed
illustrating support provided and positive outcomes for those
businesses being supported. Case studies are promoted through
social media and South Lanarkshire View and will be included in new
Invest in South Lanarkshire website.
Green
Page 16
88

Page 89

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Finance
High level action Detailed actions Comments/Progress Status
Raise awareness of
what is on offer for days
out/recreation/culture,
events in South
Lanarkshire
Provide an events calendar Developing series of business support and engagement events
including Women in Business, Meet the Buyer and other supplier
engagement sessions, promote and support various Business
Gateway, Lanarkshire Business Hub, SDP, sectoral networking events
and support national thematic events at local level.
Green
Building the generative economy
High level action Detailed actions Comments/Progress Status
Offer targeted support to
South Lanarkshire
businesses, enabling
them to create and
safeguard jobs, increase
turnover and profit
Develop sector specific programmes (tourism, food and
drink, social enterprises, green economy, construction,
manufacturing etc)
Food, Tourism and Social Enterprise Strategies completed and in
place.  Specific business support initiatives have taken place to
support key sectors including Build Lanarkshire - a construction
accelerator programme,  and women in business pilot programme
delivered with partners.  Scope of business support grants widened to
include funding for low carbon, energy efficiency projects.
Green
Tailor SLC grants to business needs with a new micro-grants
scheme for small and start up businesses with minimum red
tape.
Small business support grant pilot introduced 2022 to assist micro and
small businesses implement projects to help them grow. Has been
successful and well received by businesses and will therefore continue
as a business support offer. A new business start up grant, for
businesses which had not yet started trading and therefore ineligible
for existing support also trialled and this was implemented through
Business Gateway contractor.
Complete
Offer larger growth and recovery grants to business, based
on jobs created and increased turnover.
Business Growth Grant was delivered throughout the year committing
c£1.3M of funding to local businesses. This fund has now closed due
to the end of ERDF funding. This is being replaced with a new grant
fund focussing on creating jobs and implementing net zero activity
using UK Shared Prosperity Funding throughout 2023-24 and
2024-25.
Complete
Page 17
89

Page 90

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Building the generative economy
High level action Detailed actions Comments/Progress Status
Signpost businesses to other sources of help and advice SLC support for business webpages updated to reflect new
opportunities and available support, together with targeted social
media for specific funding opportunities and business support events.
Work closely with Business Gateway contractors to ensure businesses
are given the right advice at the right time.
Green
Develop a
marketing/investment
strategy, including a
promotional programme
with targeted/seasonal
Create a site prospectus Details of key SL inward investment sites provided to Glasgow City
Region Project management team as part of initiative to develop GCR
Inward Investment Prospectus.
Collation of SL Prospectus has commenced for inclusion in any future
SLC Inward Investment satellite website
Green
events and promotions
around key employment
sectors.
Improve web presence/ on line material Existing website presence via SLC website reviewed and updated.
meetings with corporate PR taking place to improve offer
Green
Ensure planning and other statutory advice is up-to-date and
accessible
Liaison takes place with colleagues in Planning to ensure that
information is up to date.
Green
New Volunteering
strategy for the
Community Planning
Partnership
Develop a comprehensive Volunteering Strategy Strategy approved and launched Complete
Develop a new strategic
agreement with the
Third Sector
Establish a high level review group and comprehensive
engagement process for the review
Collaborating with VASLAN and other agencies in addition to Third
Sector businesses to undertake review of sector and ensure loser
alignment with support.
Green
Implement the new
strategic agreement with
the Third Sector
High level strategic agreement group overseeing actions VASLan and Third Sector Chief Officers Group held high level
discussions with CPP Leadership and Scottish Government in
December 2022. A follow up discussion was held in March 2023 and
Partners are considering the next steps
Green
Review funding to the
Third Sector
Establish a cross-partner review group and agree terms of
reference
Review Group established and Terms of Reference agreed. Group yet
to meet and link to high level Relationship group to be resolved.
Green
New SE Strategy &
Action Plan produced
Establish a Strategy Development Group including partners
and representatives of the social enterprise sector
Social Enterprise Strategy Group established and draft strategy
publicised. Strategy to be presented to Council and CPP in 2023/24.
Green
Page 18
90

Page 91

IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
IMPROVe - SLC Performance Management System                                                                                                                                                                                                Report printed on Thursday 25 May 2023
Community Wealth Building Action Plan
Building the generative economy
High level action Detailed actions Comments/Progress Status
Social enterprise advisor recruited into Economic
Development
Experienced officer recruited June 2022, has developed collaborative
network, continues to build strong relationships with sector, completed
Social Enterprise Strategy which will be presented at CMT 18 May and
reported to CER Committee on 30 May for approval. Accelerator
support programme trialled successfully and subsequent programme
being procured.
Complete
Social Enterprise
Steering Group
established
Agree membership and terms of reference Strategy Group established and terms of reference agreed. SL Social
Enterprise Partnership now established
Complete
Page 19
91

Page 92

92

Page 93

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 6 June 2023
Report by: Executive Director (Finance and Corporate Resources) 
Subject: Forward Programme for Future Meetings 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the forward programme for the meetings of the Community
Wealth Building Commission
 invite members to suggest topics for inclusion in the Committee’s forward
programme
[1purpose]
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):-
[recs]
(1) that the report and the outline forward programme for the meetings of the
Commission, attached as an appendix to the report, be noted.
[1recs]
3. Background
3.1. At the Commission meeting on 6 September 2022, there was a wide-ranging
discussion of Community Wealth Building in response to the input from Neil McInroy
and the Scottish Government.  Members of the Commission expressed an interest in
bringing forward items to future meetings which would explore each of the 5 pillars in
detail and allow constructive discussion on how collectively to progress the CWB
agenda in South Lanarkshire. 
3.2. In a similar vein, it has been noted at previous meetings that the updates on the
action plan at Q2 and Q4 provide only an overview of progress, with brief summaries
of the actions that are being taken.  For a detailed understanding of the context,
progress and challenges under each pillar, it is necessary to look at specific topics in
detail. 
3.3. To assist in shaping the future deliberations of the Commission, an outline forward
programme is attached as an appendix to the report.  Members are invited to
consider the programme and suggest topics that they would like to see addressed at
future meetings.  
4. Employee Implications
4.1. There are no employee implications. 
5. Financial Implications
5.1. There are no financial implications.
9
93

Page 94

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability or Environmental implications in terms
of the information contained within this report. 
7. Other Implications 
7.1. There are no risk implications in terms of the information contained within this report.   
8. Equality Impact Assessment and Consultation Arrangements
8.1. The report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
18 May 2023 
Link(s) to Council Values/Objectives/Ambitions
 Accountable, effective, efficient and transparent 
Previous References
None 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
94

Page 95

APPENDIX – CWB COMMISSION OUTLINE FORWARD PROGRAMME 
Meeting Date Item Responsibility
5 September 2023  Action Plan 2023 Refresh
 Annual Report
 National Planning Framework 4
 Strategic Approach to Town Centres
 CWB Charter
 Third Sector and CWB
 Forward Programme for Future Meetings
Neil
Neil
Tony
Iain
Neil 
Steven
Susan/Helen   
12 December 2023  Forward Programme for Future Meetings Susan/Helen   
12 March 2024  Forward Programme for Future Meetings
 Meeting Timetable 2024/2025
Susan/Helen
Susan/Helen   
Future Meetings  Employability and the Employment Pillar
 Asset Transfer
 Planning for Place and CWB
 Community Benefits within Contracts
 UN Sustainable Development Goals 
SLC
SLC
SLC
SLC
VASLan or 
Cmty Planning   
95

Page 96