Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 29 August 2022 
Dear Member 
Community Wealth Building Commission 
The Members listed below are requested to attend a meeting of the above Board to be held
as follows:- 
Date:  Tuesday, 06 September 2022
Time:  14:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton, ML3
0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
South Lanarkshire Council
Councillor Alex Allison
Councillor Robert Brown
Councillor Margaret Cooper
Councillor Joe Fagan (Chair)
Councillor Kirsten Robb
Councillor John Ross
Councillor Margaret B Walker
Cleland Sneddon, Chief Executive
Paul Manning, Executive Director (Finance and Corporate Resources)
Soumen Sengupta, Director, Health and Social Care 
Heather Knox, Chief Executive, NHS Lanarkshire
Andy Aird, Federation of Small Businesses
Steven Sweeney, Chief Executive, VASLan
Thomas Adamson, Estates Environment Manager, University of the West of Scotland
(UWS) 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community Wealth Building Commission
held on 28 June 2022 submitted for approval as a correct record.  (Copy
attached) 
5 - 8 
Item(s) for Consideration 
3 Input from CLES/Scottish Government
Verbal update on Community Wealth Building in Scotland, Neil McInroy
and Tracy Jackson, Local Economic Delivery, Scottish Government 
4 Local Spend Update
Report dated 14 July 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
9 - 16 
5 Community Wish Lists
Report dated 15 July 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
17 - 20 
6 Community Wealth Building - Risk Register
Report dated 12 August 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
21 - 30 
7 Community Wealth Building Action Plan 2022 Refresh
Report dated 19 August 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
31 - 44 
8 Community Wealth Building - Town Centres
Report dated 25 July 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
45 - 66 
9 Community Wealth Building Commission - Annual Report
Verbal update from Tom Little, Head of Corporate Communications and
Neil Reid, Research and Improvement Manager.  (Copy of Annual Report
2021/2022 attached) 
67 - 88 
Urgent Business 
10  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Helen Calley
Clerk Telephone: 07385370069
Clerk Email: helen.calley@southlanarkshire.gov.uk
2

Page 3

3

Page 4

4

Page 5

COMMUNITY WEALTH BUILDING COMMISSION 
Minutes of meeting held via Microsoft Teams and in the Banqueting Hall, Council Offices, Almada
Street, Hamilton on 28 June 2022 
Chair:
Councillor Joe Fagan 
Present:
South Lanarkshire Council
Councillors Alex Allison, Robert Brown, Maureen Chalmers (substitute for Councillor Ross),
Margaret B Walker
C Sneddon, Chief Executive; P Manning, Executive Director (Finance and Corporate Resources); S
Sengupta, Director, Health and Social Care
Federation of Small Businesses
A Aird, Group Chair
University of the West of Scotland
T Adamson, Estate Environmental Manager
VASLan
S Sweeney, Chief Executive Officer 
Also Attending:
South Lanarkshire Council
N Docherty, Administration Assistant; S Keating, Property Development Manager; T Little, Head of
Communications and Strategy; G McCann, Head of Administration and Legal Services; N Reid,
Improvement and Community Planning Manager; S Somerville, Administration Manager 
Apologies:
South Lanarkshire Council
Councillors Margaret Cooper, Kirsten Robb, John Ross
NHS Lanarkshire
H Knox, Chief Executive 
Chair's Opening Remarks
The Chair welcomed everyone to this first meeting of the Commission in the new Council term and
stated that he hoped partners and councillors would work together to build on the approach
previously adopted. 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Community Wealth Building Commission held on 7 February
2022 were submitted for approval as a correct record. 
The Commission decided: that the minutes be approved as a correct record.
2
5

Page 6

3 Context for Community Wealth Building: Data Digest
A report dated 9 June 2022 by the Executive Director (Finance and Corporate Resources) was
submitted presenting data on the social and economic situation in South Lanarkshire as a
context for Community Wealth Building. 
A joint session of the North and South Lanarkshire Community Planning Partnerships had been
held in June 2021 on the topic of tackling inequalities.  The Partnership Boards had considered
a digest of demographic, social and economic indicators that related to North and South
Lanarkshire. 
The information had been presented to the inaugural meeting of the Commission in August 2021
and was now updated, where possible, and attached as Appendix 1 to the report. 
The data digest covered a range of topics including:- 
 general population
 claimant unemployment and universal credit claimants
 child poverty
 welfare service statistics
 economic performance, including GVA, business start-ups and failures and businesses per
population
 health
 impact of Covid on the labour market
 a range of public health indicators, including road accident casualties, crime statistics and
hospital admissions data 
C Sneddon advised that monitoring the data would enable decisions to be made in terms of
addressing poverty, maximising employment opportunities and giving people choices. 
In response to a member’s question, T Little advised that the data gave a South Lanarkshire
overview, however, the website had a tool to obtain information at ward level, therefore, he
could respond to individual’s queries. 
Councillor Chalmers referred to the level of energy costs and the significant rise in those
seeking assistance at Citizens Advice Bureaux.  She advised that the Legal Services Agency
had been awarded National Lottery funding and could also offer advice. 
The Chair thanked officers for the information and highlighted it was important to consider the
impact of increasing costs in terms of the real economy in South Lanarkshire and the general
levelling up agenda for public health. 
The Commission decided: that the report be noted. 
[Reference: Minutes of 31 August 2021 (Paragraph 3)] 
4 Community Wealth Building Action Plan Q4 Update
A report dated 8 June 2022 by the Executive Director (Finance and Corporate Resources) was
submitted providing the Quarter 4 progress update on the Community Wealth Building (CWB)
Strategy action plan. 
There were 89 actions within the CWB action plan.  Of those, 66 were ‘Year 1’ actions that were
due to be started or progressed in 2021/2022.  Progress to date against those 66 actions was
shown in the CWB Quarter 4 Performance Report 2021/2022, attached as Appendix 1 to the
report.
6

Page 7

The report used a traffic light format, as outlined in paragraph 4.3 of the report, with the overall
summary of progress to date as follows:- 
Status        Measures
Number %
Blue   8   12
Green 49   74
Amber   4     6
Red   5     8
Report later   0     0
Totals 66 100 
In response to a member’s question, T Little advised that measures would be refined over time
to make them real and time bound. 
C Sneddon intimated that the Executive Director (Community and Enterprise Resources) was
meeting with S Sweeney to discuss the social enterprise strategy following the recent
appointment of an officer. 
The Commission decided: that the Quarter 4 progress update on the Community
Wealth Building Strategy action plan be noted. 
5 Community Wealth Building Annual Report 2021/2022
A report dated 25 May 2022 by the Executive Director (Finance and Corporate Resources) was
submitted presenting a draft of the Community Wealth Building (CWB) annual report for
2021/2022. 
On 10 March 2021, the Council approved a Community Wealth Building Strategy. 
Consequently, the Community Wealth Building Commission was set up to engage a wide range
of partners and stakeholders in the CWB agenda. 
In August 2021, the Commission approved an action plan for delivery of the CWB Strategy.  The
action plan contained a range of actions over a 3 to 5-year timeframe, setting out how the
aspirations of the Strategy would be progressed for each of the 5 pillars of CWB. 
The draft annual report, which allowed a more public-facing and accessible presentation of
information using graphics, case studies and design elements, was attached as Appendix 1 to
the report.  If approved, branding developed for the CWB strategy would be applied to the final
document and a communications plan developed to ensure its dissemination to appropriate
audiences. 
The Commission decided: that the draft annual report for 2021/2022, attached as
Appendix 1, be approved. 
6 Support for Town Centres
A verbal update was provided by S Keating, Property Development Manager, in relation to
support for town centres. 
There would be a comprehensive report submitted to the September meeting on the Council’s
work in relation to supporting town centres and businesses. 
A Aird referred to the ‘inside out’ App and suggested it might be helpful to have an analysis of
BIDS.
7

Page 8

The Commission decided: that the verbal update be noted. 
7 Meeting Timetable 2022/2023
A report dated 23 May 2022 by the Executive Director (Finance and Corporate Resources) was
submitted proposing that future meetings of the Commission take place at 2.00pm on the
following dates:- 
 Tuesday 6 September 2022
 Tuesday 6 December 2022
 Tuesday 28 February 2022 
All meetings would be held on a blended basis to allow attendance in person or remotely. 
The Commission decided: that future meetings of the Commission be held on the
dates detailed above. 
8 Any Other Competent Business 
There were no other items of competent business. 
Chair’s Closing Remarks
The Chair advised that a copy of the response sent to a member on matters relating to the work of
the Commission would be circulated following the meeting. 
8

Page 9

Report
Agenda Item 
Report to: Community Wealth Building Commission 
Date of Meeting: 6 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Local Spend Update 
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 update the Community Wealth Building Commission on the progress made in
relation to analysis of local spend and the identification of further opportunities to
increase current levels
 [purpose]
2. Recommendation(s)
1.2. The Community Wealth Building Commission is asked to approve the following
recommendations: -
]
(1) note the contents of the report; and
(2) agree the next steps as outlined in section 8
(3) [purpose]
3. Background
3.1.  A report to the Community Wealth Building Commission meeting on 7 February 2022
provided performance information on the level of local spend, a geographical analysis
of the 2020/21 spend and wider analysis of the spend. 
3.2. The report also identified the following actions to further understand the factors that
influence the level of local spend and the identification of further opportunities for local
spend:
• Analysis of the mix of South Lanarkshire businesses and how it compares to
those in North Lanarkshire. 
• Further analysis of council spend across the 5 levels comprising:
o SLC
o Pan-Lanarkshire
o Glasgow City Region
o Scotland 
o Outwith Scotland 
• Analysis of the spend leakage report provided by Grow Local (a Scottish
Government reporting tool). This details the areas where spend takes place
outwith South Lanarkshire, highlights the availability of potential suppliers in
South Lanarkshire and therefore where opportunities may exist to increase
local spend with these businesses.
• Put in place the appropriate arrangements to be able quantify the level of sub-
contracting spend with South Lanarkshire businesses. 
4
9

Page 10

3.3. The Council’s performance in recent years, compared to the average position across
Scotland is summarised below, now including the position for 2021/2022. 
Year SLC performance Scottish average
2016/2017 13.3% 26.5%
2017/2018 15.5% 27.4%
2018/2019 18.1% 28.7%
2019/2020 18.0% 28.5%
2020/2021 17.0% 29.1%
2021/2022 17.9% Not yet reported 
3.4 The Council’s 2021/2022 spend with local enterprises has returned to the pre-
pandemic position: this is directly related to increased spend with local suppliers for
works, good and services adversely impacted by Covid 19, including construction,
furniture and transport. 
4. Analysis of South Lanarkshire businesses 
4.1.   The Improvement Service’s Local Government Benchmarking Framework (LGBF)
indicators have shown that South Lanarkshire has a lower proportion of procurement
spend on local enterprises than North Lanarkshire and the Scottish average. 
4.2. One of the highest areas of spend where there are clearly opportunities to improve
local spend is in construction. As part of the further exploration into the apparent
variance in spend on local SMEs in North and South Lanarkshire some high-level
analysis of the construction sector has been undertaken. 
4.3. The latest Enterprise Count data for 2021 complements the Scottish Government’s
Businesses in Scotland data by showing that there are more medium-to-large sized
construction enterprises in  North Lanarkshire than in South Lanarkshire. 
4.4. The table below summarises the key statistics from the 2021 data for construction
companies:- 
Company Size South
Lanarkshire
North
Lanarkshire 
% Difference 
Small (0-49 employees) 1,320 1,305 +11%
Medium 50-249 (50-249
employees) 30 45 -50%
Large (Over 250
employees) 20 45 -125% 
4.5. The differences in the number of medium and large companies are believed to be due
to the traditionally higher proportion of heavy industry characteristics and industrial
land supply in North Lanarkshire compared to the South Lanarkshire business base
which has higher numbers of small businesses and the more diverse urban-rural
nature of South Lanarkshire. 
4.6. Additional information below on employees and turnover levels highlights the
significance of the higher numbers of medium and large construction companies
present in North Lanarkshire.
10

Page 11

Measure  South
Lanarkshire 
North
Lanarkshire
%
Difference
% of Scottish employees  6.2% 10.3% 4.1%
% of Scottish turnover  5.6% 10.9% 5.3% 
4.7. The improved scope of quick quote to facilitate more spend with local SMEs will
provide opportunity to close this gap. However, further investigation shows there are
low numbers of South Lanarkshire construction trades registered with Public Contracts
Scotland and are therefore, not actively engaged in public sector procurement. This
may be due to there being fewer medium and large companies that have the resources
to participate in public sector procurement and/or they do not provide the type and
scale of services required by the council. 
4.8. Feedback through sector engagement tells us that the preferred route to gaining new
business for small companies is via business-to-business referral and networking.
The perceived complexity of public sector procurement and the required investment
in completing tender submissions are potentially deterring some small businesses
that may lack sufficient administrative resources. 
4.9. Further supplier engagement and promotion of the free to access support together
with a  campaign to encourage businesses to register with PCS will be undertaken to
encourage participation in tendering exercises. 
4.10. A further route to promoting tender activity is through encouraging wider engagement
with collaborative opportunities provided by HubSW through subcontracting and
Scotland Excel to access wider public sector spend. 
5.  Further analysis of council spend 
5.1 The analysis of Council geographical spend, updated for 2021/2022 spend, is provided
in the infographic below with 35% within pan-Lanarkshire and 64% within Scotland. 
5.2.  A further analysis of the Council’s highest spend areas, Social Care and Construction,
which together represent over 50% of our procured spend in 2021/2022, is below.  
11

Page 12

5.2.1. Social Care spend accounts for 31% of council spend (£108.8m). Although only 30%
of this spend is with local enterprises, the vast majority of this spend is for care
delivered within the council area on residential and community services, supporting
local employment at a living wage level. Spend outwith the local area will indicate the
registration of the company is not in South Lanarkshire, although the care is being
delivered, and supported by employment, in the local area. 
5.2.2. Construction accounts for 25% of council spend (£89.4m) and although only 17% of
construction spend is local, there are higher levels of spend retained within Glasgow
City Region (75% overall). 
5.2.3. Spend for major infrastructure projects with Tier 1 contractors (Cruden, CCG, Wimpey)
and Hub South West, based outwith South Lanarkshire, account for a significant
proportion of spend leakage. However, as detailed below, South Lanarkshire
enterprises benefit from subcontracting opportunities, demonstrating the importance
of developing South Lanarkshire SMEs not only to bid for local Council contracts but
to access wider opportunities.
• SLC spend with Hub South West 2021/2022: £17.6m
• Subcontracting spend in South Lanarkshire from SLC spend: £7.2m (40%)
• Subcontracting spend in South Lanarkshire from all Hub SW projects: £76m 
5.2.4. Improving access for local construction companies to works contracts under £2m and
subcontracting opportunities is a key area of focus in the local spend pillar with 14%
of construction spend in South Lanarkshire. 
12

Page 13

5.3 Of the £62m spent in South Lanarkshire in 2021/2022 across all spend types, the table
below provides a further analysis by locality: this indicates that 70% of our spend is
within the larger and industrial areas of Hamilton, East Kilbride and Blantyre. 
Analysis of South Lanarkshire spend by locality 2021/2022 
Locality Spend £m %
Hamilton                              £18.560 m  30%
East Kilbride                              £16.716 m  27%
Blantyre                              £8.256 m  13%
Lanark                              £6.614 m  11%
Larkhall                              £3.819 m 6%
Rutherglen/Cambuslang                              £2.817 m  5%
Carluke                              £2.168 m 3%
Bothwell/Uddingston                              £2.101 m 3%
Strathaven                              £0.996 m  2%
Grand Total                              £62.048 m  100% 
5.4.  Spend outwith Scotland in 2021/2022 totalled £125.7m, of which 65% was spent in
the South of England or London. Highest categories of spend by business area were
Financial Services (PPP contract), Social Care, Waste and ICT. It should be noted
that, although spend on Social Care and Waste services were to companies registered
outwith Scotland, these contracts are delivered within South Lanarkshire in local care
homes and waste facilities and make a significant contribution to local employment. 
6. Grow Local Report
6.1. The Grow Local tool provides management information to inform initiatives to support
development of supply chain activity and encourage local companies to bid for an
increased share of the Council’s procurement spend.
13

Page 14

6.2. The analysis of existing suppliers by the largest active spend categories has indicated
that there  are SMEs within South Lanarkshire in categories of spend which are
largely going out with South Lanarkshire. Discussions are taking place with services,
in particular Roads and Transportation and Housing and Technical, to identify the
opportunities presented from the review of the management information that should
allow more local business to bid for prospective work on a competitive basis. 
6.3. A series of buyer and contractor engagement events will require to be arranged to
match forthcoming tender opportunities with local contractors and will also involve
support from Supplier Development Programme to assist SMEs to develop the
required suite of supporting policy and practical documentation to submit bids for
council works contracts. 
7. Sub-contracting spend with South Lanarkshire businesses
7.1 To ensure the benefits of sub-contracting spend with South Lanarkshire businesses
can be measured in a reliable and consistent way, contractors will be asked to quantify
the level of subcontracting spend. This will be done by making this a contract
requirement and allow the information to be gathered as part of the contract
management process. 
7.2 The changes required to the contract terms and conditions will be implemented as part
of the   work currently being carried out by Legal Services and Procurement Services
to implement the requirements of Scottish Procurement Policy Note (“SPPN”) 2/2022
- ‘Prompt Payment in the Supply Chain’. SPPN 2/2022 requires the Council to make
changes as to how it currently deals with ensuring prompt payment by suppliers to
further embed prompt payment performance for sub-contractors and in the supply
chain.  The aim is for this work to be completed to allow roll out in procurement
exercises from 1 October 2022.   
8. Next Steps
8.1. The report identifies several actions to support the objective of increasing local spend
levels and capturing of spend information:
• Further supplier engagement and promotion of the free to access support together
with a campaign to encourage businesses to register with PCS 
• Promote collaborative opportunities provided by HubSW through subcontracting
and Scotland Excel to access wider public sector spend
• Identify the opportunities presented from the review of the Grow Local
management information that should allow more local business to bid for
prospective work
• Supplier Development Programme to assist SMEs to develop the required suite of
supporting policy and practical documentation to submit bids for council works
contracts
• Enact the changes necessary to the council contract terms and conditions to
capture levels of sub-contracting spend 
9. Employee Implications
9.1. There are no employee implications arising from the recommendations of this report. 
10. Financial Implications
10.1. There are no financial implications arising from the recommendations of this report.  
14

Page 15

11. Climate Change, Sustainability and Environmental Implications
11.1. An increase in local procurement will support the Council’s sustainability aims. The
Council is working with the Scottish Government’s Sustainable Procurement Toolkit,
which focuses on the Sustainable Procurement Duty: to improve the social,
environmental and economic wellbeing of the local area through contractual spend.
Proposals currently being considered include a revised approach to sustainability
scoring in contracts. 
12. Other Implications
12.1. There are no other implications arising from the recommendations of this report. 
13. Equality Impact Assessment and Consultation Arrangements
13.1. There are no Equality Impact Assessment or consultation arrangement implications
associated with this report.   
Paul Manning
Executive Director (Finance and Corporate Resources) 
South Lanarkshire Council 
14 July 2022 
Link(s) to Council Values/Priorities/Outcomes
• Accountable, efficient, effective and Transparent 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Craig Fergusson, Head of Finance (Transactions)
Ext:  4951 (Tel: 01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk
15

Page 16

16

Page 17

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 6 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Wish Lists 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update the Commission on local work to develop a Community Wish List approach 
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):- 
(1) that the progress detailed within the report is noted; and
(2) that partners consider opportunities to promote Community Benefit activity from
their own procurement.
3. Background
3.1. Community Benefits are contractual requirements which deliver a wider social benefit
in addition to the core purpose of the contract. Through its procurement arrangements,
South Lanarkshire Council and its suppliers have delivered community benefits for
residents (e.g. training and employability opportunities and local supply chain sub-
contracts). 
3.2. Community Wish Lists are an emerging concept within the public sector where
communities are enabled to put forward requests for specific needs or benefits that
can then be supported by selection by suppliers delivering contracts. The main
advantage of this approach is in encouraging and providing a more bottom-up
approach to delivering community benefits as part of the public sector procurement
process, where communities needs are being directly specified by communities and
met by contractors. 
3.3. Through Glasgow City Region, projects are also delivering Community Benefits. Work
is under way to better align community benefits provided in South Lanarkshire Council
and City Deal contracts with the needs of our local communities. 
4. Current Work
4.1. All eight local authorities who are part of the City Region have agreed to work together
to develop a regional Community Wish List approach. The City Region have
committed to developing a web-based Community Wish List interface, which would
have a shared backroom and individual landing pages. This allows South Lanarkshire
and the other member authorities to have control over their own process and the
content of their web page.  A company is being appointed to design this interface and
it is expected to be available later in 2022.  
5
17

Page 18

4.2. South Lanarkshire Council has identified investment funding which will support a fixed
term 0.5FTE officer post to work with communities to promote understanding and
awareness of the Community Wish List approach.  The postholder will have a focus
on supporting groups to participate in identifying their wishes, and on managing their
expectations as to what the procurement system may be able to deliver for them and
their area.  They will exploit existing relationships with communities through the
Community Engagement Team and partners.  They will work closely with procurement
and other council staff to identify potential community wishes which may be linked to
upcoming procurement activity, as well as encouraging communities to add their lists
to a menu on the website. In addition, the post holder will also directly engage with
communities who may be least likely to participate in wish list activity to stimulate and
support them to take advantage of these opportunities. It expected that the post will
be filled by September 2022. There will be a great deal of preparatory work with
communities to introduce the new concept prior to the interface being live. 
4.3. A Community Benefits Officer is also being appointed within the Procurement service
of South Lanarkshire Council. This post will deliver Community Benefit outcomes for
the Council and Glasgow Region City Deal, with a key focus on those community
benefits which maximise the economic impact from the City Deal Procurement
Programme and Business as usual. As part of this they will monitor and manage the
delivery of Community Benefits. The Community Benefits and Community Wish List
Officers will work closely together to ensure the effectiveness of the approach. 
4.4 The NHS also has a Community Benefit Gateway (CBG), a free and easy to use online
service that connects NHS Scotland suppliers with third sector community
organisations within Scotland. It supports community initiatives such as:- 
• Work placement opportunities
• Volunteering projects
• The provision of professional advice
• Assistance with building community facilities
• Environmental proposals
• Improving and promoting biodiversity
• Lifelong learning projects 
The purpose of the CBG is to improve the economic, social and environmental
wellbeing of local areas and assists in the reduction of health inequalities across
Scotland. CBGs purpose is to establish a positive relationship between appropriate
suppliers and third sector community organisations through the fulfilment of
community needs. The Community Wish List Officer will also promote the CBG to
community organisations they engage with. Likewise, any other partner who is
delivering community benefits can also promote these through the same route. 
5. Next Steps
5.1. Once in post, the Community Wish List Officer will begin to speak to other council
officers and partners, and to the community groups who may be involved in putting
forward wishes for the Community Wish List. This will allow a process to be
established, and  following this they will design marketing and promotional tools which
can be used to publicise the opportunities available to communities. These will be
shared with partners to maximise their effectiveness in raising awareness. 
6. Employee Implications
6.1. There are no direct employee implications.  
18

Page 19

7.1 Financial Implications
5.2. There are no direct financial implications. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change implications as a result of this report. 
9. Other Implications
9.1. None. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
15 July 2022 
Link(s) to Council Values/Priorities/Outcomes
• Accountable, efficient, effective and Transparent 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Rhonda Leith, Community Engagement Manager
Email: Rhonda.leith@southlanarkshire.gov.uk 
19

Page 20

20

Page 21

Report
Agenda Item 
Report to: Community Wealth Building Commission  
Date of Meeting: 6 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Wealth Building - Risk Register 
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 present an update on the risk register for Community Wealth Building 
2. Recommendation(s)
2.1. The Community Wealth Building Commission is asked to approve the following
recommendations: -
]
(1) that the content of the Community Wealth Building risk register is noted; and
(2) that progress in the delivery of the risk control plan is noted 
3.        Background
3.1.  Recognising that Community Wealth Building (CWB) would signal a fundamental shift
in the council’s approach across a number of services, a risk register was developed
and approved by the Community Wealth Building Commission on 27 October 2021. 
3.2. Risks were recorded against each the five pillars noted within the strategy. Those
being building the generative economy; finance; land and property; spending; and
workforce. 
3.3. The purpose of the register is to ensure that the Community Wealth Building
Commission is fully aware of its strategic risks; that these risks are prioritised; and
controls are in place to eliminate or minimise the impact of the risks. 
3.4. Risks are scored on their inherent score (risk if we do nothing) and their residual risk
(risk after applying controls). 
4. The CWB Risk Register Update
4.1. The Community Wealth Building risk register, and risk control plan has been reviewed,
following consultation with the council’s CWB lead officers.  This work was completed
in July 2022. 
4.2. The updated risk register, including the recorded control is attached at Appendix One
to the report. A new overarching risk has been added with a residual score of 20,
making it the highest scoring risk: 
‘The impact of rising energy prices, inflation and interest rates adversely impacts the
delivery of the objectives of the Community Wealth Building strategy. This impact may
be exacerbated by a recession.’  
6
21

Page 22

Five control measures have been identified including business support for local
businesses and cost of living support to residents. A new control action has also been
added to the action plan to monitor the availability of support from government.   
4.3. There has also been a number of amendments to control measures. 
4.4. Some of the other key risks on the register are summarised below:
 Scope to increase spend with local business and social enterprises is limited due
to a lack of capacity / ability to meet council requirements
 Scope to significantly increase local spend through contract awards is limited by
the procurement regulations
 Limited scope to collaborate with anchor institutions due to existing contractual
commitments or lack of overlap in opportunities
 Town centres decline with increased numbers of neglected town centre assets,
decreased footfall and reduced spend in the local economy.
 Failure to demonstrate improved outcomes as a result of the CWB strategy 
4.5. The CWB Commission is asked to note the content of the updated register and note
that this will remain a live document as CWB work progresses over the forthcoming
years. 
5. Risk Control actions
5.1. A summary of progress in the delivery of the Risk Control Plan, which contains 22
actions is noted below and additional information can be found in Appendix Two.   
Status  Summary
Complete  There are three actions that have been completed.  
On
target/
Ongoing
Nineteen actions are currently deemed to be on target to deliver
within the timescale set or are ongoing with no issues identified.  
Minor
slippage
There has been minor slippage for no actions.   
Major
slippage
There has been major slippage for no actions.   
5.2. Progress with completion of Resource Risk Control Actions is monitored by the CWB
Group. 
5.3. The Commission is asked to note that the outstanding actions to mitigate risks within
Appendix Two will be progressed by the relevant lead officers. 
6.  Monitoring and reporting arrangements
6.1. As previously agreed by the Commission, the CWB Group will continue to review and
update the risk register as required, progress actions and provide an annual risk report
to the CWB Commission. 
7.   Employee Implications
7.1. There are no employee implications associated with this report. 
8. Financial Implications
8.1. There are no financial implications associated with this report.  
22

Page 23

9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained within this report. 
10. Other Implications
10.1. Failure to demonstrate that risk is actively considered and managed could adversely
affect the delivery of the CWB strategy and could affect the reputation of the council. 
The work undertaken to identify and review the risks and monitor the progress of the
risk control actions will enable the CWB Group to effectively manage the impact of
these risks. 
11. Equality Impact Assessment and Consultation Arrangements
11.2. There are no Equality Impact Assessment or consultation arrangement implications
associated with this report.   
Paul Manning
Executive Director (Finance and Corporate Resources) 
South Lanarkshire Council 
12 August 2022 
Link(s) to Council Values/Priorities/Outcomes
• Accountable, efficient, effective and Transparent 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions)
Ext:  4951 (Tel: 01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk
23

Page 24

Appendix 1
Community Wealth Building Risk Register   
Pillar We will Risk Description Inherent Risk Score 
(Prior to controls being in place)
Current control measures Residual Risk Score 
(Take account of control
measures currently in place to
mitigate the risk)
Impact Likelihood Overall
score 
Impact Likelihood Overall
score
Spend • Expand the capability of local business and
social enterprises to bid for public sector
contracts with support from economic
development and procurement teams 
• Increase promotion of tender opportunities
to local sectors 
• Increase the levels of pre-market
engagement before commissioning to shape
the preparation of tender requirement and
prepare potential local bidders
Scope to increase spend with local business and social
enterprises is limited due to a lack of capacity and / or
inability to meet council requirements 
SLC services unable to resource a sufficiently robust
programme of engagement
4 5 20 • Ongoing training businesses to
bid for contracts via initiatives
such as the Supplier
Development Programme (SDP). 
• Increase promotion of
registration with PCS among SLC
businesses
• Ongoing promotion of tender
opportunities across a wide
range of platforms.
3 5 15
Spend • Review procurement practices to deliver
more local spend where possible
Scope to significantly increase local spend through
contract awards is limited by the procurement
regulations 
4 5 20 • Promotion of tender
opportunities locally
• Meet the Buyer events
3 5 15
Spend • Review procurement practices to deliver
more local spend where possible
Increased local spend results in an increase in costs for
council budgets
3 5 15 • Sourcing strategies confirm
available budget before
commencing a tendering
exercise 
• Reports on tender highlight
potential budget pressures.
3 5 15
Spend • Increase promotion of tender opportunities
to local sectors
Falling rates of local business and social enterprises
successfully bidding for contracts because of wider
economic changes that affect capability
4 4 16 • Ongoing training businesses to
bid for contracts via initiatives
such as the Supplier
Development Programme (SDP). 
• Ongoing promotion of tender
opportunities across a wide
range of platforms
4 3 12
Spend  • Work with anchor institutions to explore
further opportunities for local spend
Limited scope to collaborate with anchor institutions due
to existing contractual commitments or lack of overlap in
opportunities
3 5 15 • None, as new activity 3 5 15
Building the
generative
economy
• Continue to develop how business grants can
help grow communities
Low take up of business grants will limit their impact on
helping to grow communities 
3 2 6 • Sector specific programmes, new
micro-grants scheme for small
and start-up businesses, and
3 1 3
24

Page 25

Pillar We will Risk Description Inherent Risk Score 
(Prior to controls being in place)
Current control measures Residual Risk Score 
(Take account of control
measures currently in place to
mitigate the risk)
Impact Likelihood Overall
score 
Impact Likelihood Overall
score
Cuts to grant support funding as consequence of budget
cuts 
Reduction in grant support funding as consequence of
budget cuts 
offering larger recovery and
growth grants should widen the
appeal of our grants'
programmes 
• Businesses are also signposted to
other sources of help and advice
Building the
generative
economy
• Promote investment opportunities to
regional and national institutions
Regional and national organisations are not convinced to
invest in Lanarkshire  
3 3 9 • We work with Scottish
Enterprise, Scottish
Development International and
Glasgow City Region partners to
raise the profile of investment
opportunities in South
Lanarkshire
3 2 6
Building the
generative
economy
• Develop actions to increase the number and
improve the sustainability of social
enterprises in South Lanarkshire 
• Develop a new Social Enterprise Strategy and
action plan and, in conjunction with the Social
Enterprise sector, establish a Social Enterprise
Steering Group 
Declining numbers and higher failure rates of social
enterprises are  recorded in South Lanarkshire
4 2 8 • Support is provided to all
businesses, including social
enterprises through the council’s
Business Support Team and
through the Business Gateway
Lanarkshire service
4 1 4
Workforce • Promote living wage and fair work practices
locally demonstrating this within our own
working practices
Organisations do not adopt fair work practices/Living
Wage
3 1 3 • Living wage campaign group
promoting the benefits is
attended by partner
organisations
3 1 3
Workforce • Identify employability support staff to
provide local employability support to
applicants
Employability funding reduces 3 2 6 • Funding opportunities are
maximised via contact with SG,
Cosla and relevant professional
groups
3 2 6
Workforce • Identify potential numbers and roles for
modern apprenticeship opportunities with
managers in the council and work with Skills
Development Scotland (SDS) to reflect these
in the contract
SDS do not fund suitable MAs 2 3 6 • Contact via professional groups
to highlight areas of need and
secure correct contract level
2 2 4
Workforce • Screen vacancies for suitability to local labour
market
Suitable vacancies are not identified 2 3 6 • Workforce planning activity to
project future needs
2 2 4
25

Page 26

Pillar We will Risk Description Inherent Risk Score 
(Prior to controls being in place)
Current control measures Residual Risk Score 
(Take account of control
measures currently in place to
mitigate the risk)
Impact Likelihood Overall
score 
Impact Likelihood Overall
score
Land and
Property
• Continue to deliver an affordable housing
supply programme
Failure to deliver duties as a statutory housing authority
including implementing the Local Housing Strategy and
deliver of an affordable housing supply programme 
4 4 8 • Range of management structures
and groups in place to ensure
progress is made on statutory
functions 
• Reporting schedule in place to
relevant regulatory authorities
and to HTR Committee, Executive
Committee and the Scottish
Government
2 2 4
Land and
Property
• Deliver improvements to support the Energy
Efficient Scotland programme and encourage
homeowners to do the same
Failure to meet energy efficiency requirements and
national targets for domestic and non-domestic
properties
4 4 8 • Annual Housing Investment
Programme agreed with funds
identified to improve number of
properties that meet required
standards 
• Reporting schedule in place to
monitor progress, through Local
Housing Strategy and
Sustainable Development and
Climate Change Strategy 
2 2 4
Land and
Property
• Repurpose town centre assets to encourage
footfall and spend in the local economy  
• Encourage investment and create thriving
places where people can access goods and
services on foot or via public transport 
• Improve our carbon footprint by making the
“20 minute neighbourhood” a reality –
promoting local shopping and health
facilities, education, green spaces, affordable
and diverse housing, safe streets, active
travel and public transport, and employment
opportunities
Town centres decline with increased numbers assets
requiring investment and repurposing, decreased footfall
and reduced spend in the local economy
3 4 12 • Using the “20-minute
neighbourhoods” as one of the
key scoring criteria when
assessing funded capital scheme
bids. Initiatives by Business 
• The council monitors funding
opportunities and pursues town
centre funding whenever
possible
• We support the Business
Improvement Districts (BIDs) to
carry out town centre
promotional activity
• Support the rollout of the
InsideOut app through increased
promotion to stimulate footfall
in town centres 
3 3 9
Finance • Through our relationship with the council’s
pension fund provider, Strathclyde Pension
Fund, look to develop and support their work
on providing opportunities for more local
investment opportunities
Pensions – lack of interest from other councils 1 3 3 • Good relationship with other
councils and awareness that
other councils are also pursuing
Community Wealth Building 
1 2 2
Finance • Through our relationship with the council’s
pension fund provider, Strathclyde Pension
Fund, look to develop and support their work
on providing opportunities for more local
investment opportunities
Pensions – SPF failure to engage or support request to
develop options for community / local investment
2 3 6 • Relationship with Pension fund
through officers 
2 2  4
Finance • Building on the relationship we already have
with local credit unions, we will work locally
Credit unions - Lack of cooperation from Credit Unions 2 3 6 • Good relationships with credit
unions 
1 2 2
26

Page 27

Pillar We will Risk Description Inherent Risk Score 
(Prior to controls being in place)
Current control measures Residual Risk Score 
(Take account of control
measures currently in place to
mitigate the risk)
Impact Likelihood Overall
score 
Impact Likelihood Overall
score
with the credit unions and other community
partners to explore ways to encourage use of
the saving and affordable credit facilities
which they offer
Finance • Building on the relationship we already have
with local credit unions, we will work locally
with the credit unions and other community
partners to explore ways to encourage use of
the saving and affordable credit facilities
which they offer
Credit Unions  - Lack of uptake for services offered 2 3 6 • CUs promote their services- 
current use of CUs is encouraging 
1 2 2
Finance • Encourage SLC staff, those of other anchor
institutions, local businesses and residents to
spend locally and retain investment in local
businesses and promote local tourism  
Spend local – local companies fail to promote themselves
effectively
1 3 3 • Our contractor Business Gateway
Lanarkshire runs a wide range of
free marketing and social media
training programmes for varying
levels of technical ability
1 2 2
Finance • Encourage SLC staff, those of other anchor
institutions, local businesses and residents to
spend locally and retain investment in local
businesses and promote local tourism  
Spend Local – no support from local trading networks. 2 3 6 • A shop local message is
promoted by many existing local
business groups in South
Lanarkshire
2 2 4
Finance • Encourage SLC staff, those of other anchor
institutions, local businesses and residents to
spend locally and retain investment in local
businesses and promote local tourism  
Events calendar – attendance at events is low.  2 3 6 • Events are promoted through the
council’s website and social
channels and via South
Lanarkshire Leisure & Culture,
Visit Lanarkshire and
VisitScotland websites and social
media channels
2 2 4
Overarching N/A Failure to demonstrate improved outcomes as a result of
the CWB strategy
2 3 6 • CWB Commission in place to
oversee progress
• Monitoring and reporting
framework has been developed
and delivered – Q2 and Q4
reporting of action plan to CWB
Commission
2 2 4
Overarching N/A Failure to integrate CWB with strategic and operational
plans 
3 3 9 • Annual review of Resource
Plans reflects CWB aspirations
• Council Plan and Community
Plan have been renewed and
are designed to ensure CWB
integrates strategically
3 1 3
Overarching N/A Ineffective engagement with communities as part of the
CWB strategy
3 3 9 • Action Plan includes
engagement with VASLAN and
community groups
3 1 3
Overarching  N/A The impact of rising energy prices, inflation and interest
rates adversely impacts the delivery of the objectives of
the Community Wealth Building strategy. This impact
may be exacerbated by a recession. 
5 5 25 • Business support for local
businesses
• Provide more opportunities for
local businesses to win
contracts from the council and
anchor institutions 
5 4 20
27

Page 28

Pillar We will Risk Description Inherent Risk Score 
(Prior to controls being in place)
Current control measures Residual Risk Score 
(Take account of control
measures currently in place to
mitigate the risk)
Impact Likelihood Overall
score 
Impact Likelihood Overall
score
• Cost of living support to
residents 
• The council monitors funding
opportunities and pursues town
centre funding whenever
possible
• We support the Business
Improvement Districts (BIDs) to
carry out town centre
promotional activity 
28

Page 29

Appendix 2
Community Wealth Building Risk Control Plan   
Pillar Risk Description Further actions required to control risk Action target
date
Risk Lead Officer Status Update
Spend Scope to increase spend with local business and social enterprises is limited
due to a lack of capacity and / or ability to meet council requirements 
• Do further work with partners such as SDP to improve the capacity of
social enterprises to bid for public sector contracts. 
• Increase levels of pre-market engagement.
• Increase promotion of tender opportunities across a wide range of
platforms 
Year 1 
(March 2022)
then annual
reviews.
Head of Planning and
Economic Development
On target/
Ongoing
• Completion of gap analysis  Year 2 
(December
2022) 
On target/
Ongoing
Spend Scope to significantly increase local spend through contract awards is limited
by the procurement regulations 
• Greater focus on low value spend requirements, sub-contracting
opportunities and community benefits.  
(March 2023)
then annual
reviews.
Head of Finance
(Transactions)
On target/
Ongoing
• Manage pipeline of projects for Quick Quote for Works under £2m
process 
Ongoing On target/
Ongoing
Spend Increased local spend results in an increase in costs for council budgets • Monitor contract award values against budgets with operational
managers
Ongoing Head of Finance (Strategy)  On target/
Ongoing
Spend Falling rates of local business and social enterprises successfully bidding for
contracts because of wider economic changes that affect capability. 
• Increase promotion of tender opportunities across a wide range of
platforms 
• Completion of gap analysis 
Year 1 
(March 2022)
then annual
reviews. 
Year 2 
(December
2022)
Head of Enterprise and
Sustainable Development
On target/
Ongoing
Spend  Limited scope to collaborate with anchor institutions due to existing
contractual commitments or lack of overlap in opportunities
• Assess collaborative opportunities over a longer period 
• Continue engagement with anchor institutions, including NHS
Ongoing Head of Finance
(Transactions)
On target/
Ongoing
Building the
generative
economy
Low take up of business grants will limit their impact on helping to grow
communities 
Cuts to grant support funding as consequence of budget cuts
• Review annually. Adjust business support programmes if take-up levels
are lower than anticipated 
Year 1
(March 22)
then annual
reviews.
Head of Enterprise and
Sustainable Development
On target/
Ongoing
Building the
generative
economy
Regional and national organisations are not convinced to invest in
Lanarkshire.  
• New inward investment officer and improved marketing materials
should result in more demand and secure investment 
• Monitor and review indicators. Take additional action if necessary. 
• Increase investment in property and infrastructure to provide range of
modern business accommodation
Year 1
(March 2022)
then annual
reviews 
Head of Enterprise and
Sustainable Development
On target/
Ongoing
Building the
generative
economy
Declining numbers and higher failure rates of social enterprises are 
recorded in South Lanarkshire.
• The development of a social enterprise strategy and action plan.  
• Monitor and review indicators. Take additional action if necessary
Year 1
(March 2022)
Then annual
reviews.
Head of Enterprise and
Sustainable Development
On target/
Ongoing
• Formation of a steering group  Year 2 On target/
Ongoing
• recruitment of a dedicated Social Enterprise Officer should ensure higher
success rates via the provision of additional tailored support to social
enterprises in South Lanarkshire 
Year 1
(September
2021)
Complete
Land and
Property
Town centres decline with increased numbers of neglected town centre
assets, decreased footfall and reduced spend in the local economy.
• Monitor and review indicators. Take additional action if necessary  Year 1
(October 21)
then annual
reviews.
Head of Enterprise and
Sustainable Development
and Head of Planning and
Regulatory Services
On target/
Ongoing
29

Page 30

Pillar Risk Description Further actions required to control risk Action target
date
Risk Lead Officer Status Update
Finance Pensions – lack of interest from other councils.  • Early engagement with neighbouring councils  Ongoing Head of Finance (Strategy)  On target/
Ongoing
Finance Credit unions - Lack of cooperation from Credit Unions. • Named link person identified to develop Credit Union network and be
first point of contact for CUs 
Year 2 Community Engagement
Manager
On target/
Ongoing
Finance Credit Unions  - Lack of uptake for services offered.  • CPP Communications Group actively promotes Credit Unions as part of
their activity
By October
2022
Community Engagement
Manager
On target/
Ongoing
Finance Spend Local – no support from local trading networks. • Monitor and take additional action if necessary Year 1
(March 2022)
Then annual
reviews.
Head of Planning and
Economic Development
On target/
Ongoing
Finance Events calendar – attendance at events is low.  • Monitor and take additional action if necessary Year 1
(March 2022)
Then annual
reviews.
Head of Planning and
Economic Development
On target/
Ongoing
Overarching Failure to demonstrate improved outcomes as a result of the CWB strategy • Monitoring and reporting framework to be developed and delivered –
quarterly reporting of action plan to CWB Commission
n/a Head of Communications
and Strategy
Complete
Overarching Failure to integrate CWB with strategic and operational plans  • Compete Review of Council Plan and Community Plan which will ensure
CWB integrates strategically
n/a Head of Communications
and Strategy
Complete
Overarching Ineffective engagement with communities as part of the CWB strategy • Ensure Progress Group considers engagement with communities and
exploits existing links with communities to support CWB
Year 2
(March 2023)
Head of Communications
and Strategy
On target/
Ongoing
Overarching The impact of rising energy prices, inflation and interest rates adversely
impacts the delivery of the objectives of the Community Wealth Building
strategy. This impact may be exacerbated by a recession.
• To monitor the availability of support from government Ongoing Head of Finance
(Transactions)
On target/
Ongoing 
30

Page 31

Report
Agenda Item 
Report to: Community Wealth Building Commission
Date of Meeting: 6 September 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Wealth Building Action Plan 2022 Refresh 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 Provide the Commission with the Community Wealth Building (CWB) Action Plan
for 2022/2023, following a review of the actions at the end of the first year of the
CWB Strategy.
[1purpose]
2. Recommendation(s)
2.1. The Commission is asked to approve the following recommendation(s):-
[]
(1) that the draft CWB action plan, attached at appendix 1, be approved.
[1recs]
3. Background
3.1. At the first meeting of the Community Wealth Building Commission on 31 August 2021,
the Commission approved an action plan to accompany the Community Wealth
Building Strategy. 
3.2. Performance reports detailing progress against the action plan were presented to the
Commission at Q2 (October 2021) and Q4 (June 2022).  Following presentation of the
Q4 report, the action plan was reviewed to remove completed actions and to refresh
the remaining actions for year 2 of the strategy. 
3.3. This report presents the refreshed action plan for 2022/2023. 
4. CWB Action Plan – 2022 Refresh
4.1. All actions within the action plan have been reviewed by lead officers for the CWB
pillars to remove completed actions and refresh the remaining actions, adding new
actions or rewording actions as required. 
4.2. Through the CWB Progress Group, the revised action plan has benefited from Partner
feedback and input.  The action plan also strengthens links between CWB and the
climate change and sustainability agenda.  The importance of “place” and the role of
spatial planning in CWB has also been taken into account. 
4.3. The refreshed action plan will continue to be monitored and reported through the
Improve system.  Progress updates will be provided to the CWB Commission at Q2
and Q4.  
7
31

Page 32

5. Next Steps
5.1. If approved, the draft CWB action plan will be uploaded to the performance monitoring
system Improve, which will be used to provide progress reports to the Commission at
Q2 and Q4. 
6. Employee Implications
6.1. There are no direct employee implications. 
7. Financial Implications
7.1. There are no direct financial implications. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change, sustainability and natural environment implications
arising from this report. 
9. Other Implications
9.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact assessment
is required. 
10.2. Consultation was undertaken internally via the officer group for CWB and with partners
via the CWB Progress Group. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
19 August 2022 
Link(s) to Council Values/Priorities/Outcomes
• Promote Performance Management and Improvement 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
32

Page 33

Appendix 1 
Spending 
Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
1 Expand the capability of local
business and social
enterprises to bid for public
sector contracts with support
from economic development
and procurement teams. 
1.1 
Provide support to local
sectors based on an
assessment of current
capabilities ensuring
support from Supplier
Development
Programme.
Deliver training events on
public sector
procurement for relevant
contracts. 
March 2023
(Annual)
Completion of a gap
analysis of current
capabilities.
December
2022
Review of the range of
support provided to those
markets and identify
measures to increase
capability.
January 2023 
Increase the level of
spend with local
companies 
March 2023
(Annual)   
Increase the number of
registrations with Public
Contracts Scotland
tendering portal 
March 2023
(Annual)   
Increase the number of
registrations with
Supplier Development
Programme 
March 2023
(Annual)   
Increase the contracts
awarded to local
companies 
March 2023
(Annual)   
Consider long term
economic development
growth opportunities
across South Lanarkshire
March 2024
2 Build on our knowledge of
market supply through further
analysis of local capacity to
identify new opportunities for
local business to grow 
2.1
Assess local markets,
their existing capacity
and willingness of
business to grow
together with the
identification of
appropriate contract
opportunities.
Complete local market
analysis to identify
opportunities for local
growth working with the
Lanarkshire Economic
Development Forum.
February
2023 
Encourage local
suppliers to bid for
Scotland Excel contract
opportunities
March 2023
(Annual)   
Promote the council’s
contract register and
annual report pipeline as
a source of information to
interested parties
March 2023
(Annual)
33

Page 34

Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Manage the pipeline of
projects utilising the
flexibility provided by new
Quick Quote process 
March 2023
(Annual)   
Complete a Market
Capacity Assessment to
understand the capability
of the food and drink
sector to supply food and
drink to the council
March 2023
3 Increase the levels of pre-
market engagement before
commissioning to shape the
preparation of tender
requirement and prepare
potential local bidders
3.1
Assess those
procurement
opportunities where pre-
market engagement
would be considered
beneficial. 
Utilise support from
Supplier Development
Programme to facilitate
pre-market engagement,
using their marketing and
social media channels,
plus webinars and early
engagement events. 
March 2023
(Annual)   
Maintain liaison with Tier
1 contractors to promote
SME engagement for
sub-contract
opportunities and, where
possible, obtain details of
successful awards
March 2023
(Annual)
4 Increase promotion of tender
opportunities to local sectors 
4.1
Use a range of
communication
methods to advertise
opportunities to
potential bidders.
Conduct supplier events
and increase the use of
social media.
March 2023
(Annual)
Supplier Development
Programme to raise
market awareness of
opportunities using their
marketing and social
media channels, plus
webinars.
March 2023
(Annual)
5 Improve the environmental
outcomes from procurement
including support for the
transition to net zero 
5.1
Review sustainability
requirements for
contracts.
Review the scope and
scoring of sustainability
requirements in contracts
to maximise
environmental benefits.
March 2023 
Implement the Flexible
Framework Sustainability
action plan to further
embed good
procurement practice.
March 2023 
6 Work with anchor institutions
to explore further opportunities
for more local spend
6.1
Identify those anchor
organisations willing to
participate and promote
Assessment of tender
opportunities and
development of
collaborative procurement
routes.
March 2024 
34

Page 35

Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
contract opportunities to
local SMEs and social
enterprises. 
NHS Lanarkshire will
work with SDP as part of
a short-term supply chain
diversity project to
encourage a wider pool
of suppliers, support
more local SMEs to
become suppliers, and
will focus in particular on
increasing diversity. 
March 2023
7 Maximise our approach to
community benefits 
7.1
Review of the changes
to delivering increased
levels of community
benefits and
identification of new
opportunities to improve
community outcomes.
Review the scope of the
community benefits menu
and minimum scoring to
identify opportunities for
improving the gain for
communities. 
March 2023 
Identify specific community
benefits that can be
delivered from contracts
that can support
communities.
January 2023 
NHS Lanarkshire will
support and encourage
the use of the National
NHS Scotland
Community Benefits
Portal
March 2023
8 Ensure contractors deliver
social investment 
8.1
Review of the range of
measures that can be
put in place to deliver
greater levels of social
investment from
contractors. 
Review the scope and
scoring of contracts to
maximise social investment
March 2024 
Put in place greater levels
of monitoring in relation to
compliance with the range
of charters.
March 2024 
9 Review procurement practices
to deliver more local spend
where possible
9.1
Consideration of the
changes that could be
made to the way
contractual
opportunities are
presented to the market
and evaluated in
support of community
wealth building
objectives. 
Provide a Local Spend
update. 
September
2022
Report on the progress of
the new Quick Quote
arrangements 
December
2022
Review the contract
evaluation criteria for
regulated spend.
January 2023 
Identify the spend in scope
based on the requirements
of the procurement
regulations, reflecting
changes to standing orders
and evaluation criteria. 
February
2023 
Identification of local
contract opportunities
where viable local markets
exist based on changes to
standing orders and
evaluation criteria.
March 2023 
35

Page 36

Workforce 
Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
10 Promote Living Wage and Fair
Work practices locally
demonstrating this within our
own working practices 
10.1
Ensure that all Anchor
organisations including
South Lanarkshire
Council have adopted
the Living Wage as well
as Living hours and fair
work practices
We will continue to
advocate the Living Wage
and work on developing
living hours along with our
Community Planning
Partners and Anchor
Organisations. 
March 2023
10.2
Support our local
businesses to create fair
working practices
Continue to ensure that all
businesses and third sector
organisations who engage
with the Council are
encouraged to adopt the
Living Wage and a fair work
approach to employment
practices. 
March 2023
Provide webinars and
support to understand
impact of Fair Work, for
employers and
communities.
March 2023
10.3
We will improve the
percentage of
applicants from South
Lanarkshire  SIMD
areas who secure  work
with Living Wage
accredited employers
Our employability projects
will work with managers to
identify pre employment
training and skills required
for entry level jobs as well
as building on existing work
to prepare our local
residents for interview and
improve their employability. 
March 2023
March 2023
11 Identify employability support
staff to provide local
employability support to local
applicants 
11.1
We will continue to
deliver employability
programmes which help
local residents into
work.
We will map the extent of
employability support with
partners - identifying
strengths, gaps and areas
for development.
March 2023
12 Identify areas of anticipated
future demand through
workforce planning and put in
place training programmes
and access to qualifications to
match this 
12.1
Work with our own
services and public and
private sector partners
to identify the skills they
need to grow and create
wealth in the local
economy, including
skills needed for the
transition to a net-zero
economy 
We will work with our own
services and with partners
on our Local Employability
Partnership, local business
organisations including
Federation of Small
Businesses and 
Lanarkshire Chamber of
Commerce. The purpose is
to consult with these
communities – gathering
data on their immediate as
well as future skills needs.
We will develop existing
relationships with Scottish
Enterprise, Business
Gateway and Skills
March 2023
36

Page 37

Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Development Scotland to
ensure that up to date
labour market and demand
led data is informing our
plans and developing our
skills and knowledge
training
12.2
Be responsive to
business and Social
Enterprise needs
We will further develop our
Upskilling programme to
ensure it is meeting
demand led skills
requirements and
qualifications from local
SMEs and Social
Enterprises in particular. 
We will work with new
businesses to ensure
residents are upskilled prior
to launch date through pre-
employment training and
employability support.
March 2023
13 Screen vacancies for suitability
to local labour market 
13.1
Promote the Council
and partners as an
‘Employer of Choice’
highlighting our
excellent Terms and
Conditions and
opportunities for flexible
working.
Build on work ongoing with
Targeted recruitment in
Employability Services,
ensuring that applicants are
supported to apply for
vacancies with the council
and partners as well as
receiving pre-employment
training where required.
Use available funding to
support job opportunities for
local people within council.
March 2023
13.2
Continue to support
local residents and
businesses through our
extensive employability
programme of support
We will continue to work
with local companies and
residents to ensure we
reach the best fit of local
vacancies to skills.
Investing in training and
employability support where
required.
March 2023
(Annual)
14 Identify potential numbers and
roles for Modern
Apprenticeship opportunities
with Managers in the council
and work with SDS to reflect
these in the contract. 
14.1
Identify suitable Modern
Apprenticeship
opportunities within the
Council over next 2-5
years
Work with Resource
workforce plans to identify
numbers and MA
occupational areas, and
build on MA frameworks to
create training which meets
the needs of SLC.
March 2023
14.2
Engage with SDS to
agree MA priorities at
national and local level
Modern apprenticeship
opportunities a standing
item for discussion at local
employability partnership
meetings.
March 2023
14.3
Work with Education
Resources to identify
suitable Foundation and
Monitor progress of
Foundation apprenticeship
candidates who are
ready/suitable for Modern
Apprenticeship
March 2023
37

Page 38

Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Modern Apprenticeship
journeys
opportunities. Put in place
any additional supports
required.
15 Explore with Scottish
Government the possibility of
using Youth Guarantee
funding to support these
additional Modern
Apprenticeship roles
15.1
Review the funding
streams available to the
Council to support
training including
Modern Apprenticeships
Examine the terms and
conditions of these funding
streams to identify best
option for funding or part-
funding Modern
Apprenticeship
programmes and other
training opportunities
March 2023
15.2
Put in place options for
trainee positions
including modern
apprenticeships using
workforce plans and
funding criteria to
maximise effectiveness
Use different funding
streams to leverage best
available options for
sustainable traineeships.
Link to work with DYW.
March 2023 
38

Page 39

Land and property 
Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
16 Continue to deliver an
Affordable Housing Supply
Programme 
16.1
Increase the supply of
affordable housing
across South
Lanarkshire 
Deliver the Strategic
Local Programme
Agreement (SLPA)
October
2022
(Annual)
Preparation and approval
of the Strategic Housing
Investment Plan (SHIP) 
Implement policy on
affordable housing in new
private developments in
Local Development Plan
2
March 2023
(Annual)
17 Continue to operate and
further develop the Open
Market Purchase Scheme 
17.1
Identify and purchase
appropriate properties to
meet specific housing
needs 
Specific content within
SHIP approved in relation
to Open Market Purchase
Scheme. 
October
2022
(Annual)
Target of 67 properties
purchased through Open
Market Purchase Scheme
for 2021/22.  have yet to
agree what the target is
for OMPS within 2022/23.
October
2022
(Annual)
18 Identify opportunities for
housing led regeneration
projects 
18.1
Continuous assessment
of regeneration priorities
as part of Local Housing
Strategy process.
Considered as part of
annual review of Local
Housing Strategy. 
November
2022
(Annual)
Identified priority projects
included as part of SHIP
development.
October
2022
(Annual)
Ensure priority projects
are included as part of
the preparation of the
next Local Development
Plan 3
March 2023
(Annual)
19 Support owners of empty
homes to bring them back
into use 
19.1
Continue to target long-
term empty homes to
bring them back into
effective use and
contribute towards
meeting housing needs
with a target of 15 set
for 2022/23.
Establish a Matchmaker
Scheme to link empty
properties with interested
buyers.
November
2022
(Annual)
Set up an empty home
grant scheme providing
financial support for
owners to improve
property condition.
39

Page 40

Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
Provide practical advice
and assistance to empty
property owners.
20 Promote and support the
Community Asset Transfer
process 
20.1
Provide direct support to
applicants 
A Community Asset
Transfer Development
Officer has been recruited
and will promote and
support the asset transfer
process
March 2023
(Annual)
20.2
Community Asset
Transfer to be promoted
to communities across
South Lanarkshire
Process for promotion of
Community Asset
Transfer to be agreed
March 2023
21 Deliver improvements to
support the Energy
Efficient Scotland
programme and encourage
homeowners to do the
same 
21.1
Continue to improve the
energy efficiency of the
Council’s housing stock
contributing towards
national climate change
ambitions 
The Housing Investment
Programme will continue
to incorporate sustainable
changes to the Council’s
housing stock, working
towards increasing the
number of properties that
meet the Energy
Efficiency Standards for
Social Housing 2
(EESSH2). A target of
10% has been set for
2022/23.
April 2022
(Annual)
21.2
Continue to implement
energy efficiency
measures across
council and partner
facilities including
investment in renewable
energy solutions and
low/ zero-carbon
heating
Deliver a range of
projects as part of the
Community Energy
Efficiency Fund
programme. 
April 2023
(Annual)
Reduce embodied carbon
from construction (new
builds and refurbishment)
21.3
Continue to maximise
Energy Efficient
Scotland funding to
support owners and
private rented properties
Work with partners,
including Home Energy
Scotland, to provide
advice and support to
owners and private
landlords on funding
opportunities available to
them. 
April 2023
(Annual)
22 Repurpose neglected town
centre assets to encourage
footfall and spend in the local
economy, and create thriving
places where people can
access goods and services
on foot or via public transport. 
22.1
Take the “20-minute
neighbourhood”
concept into account
when planning capital
schemes. 
Use 20 minute
neighbourhoods” as a
key scoring criteria
when assessing bids
for UK, Scottish
Government and
Council funded capital
schemes 
October
2022
(Annual)
40

Page 41

Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
22.2
Implement national
planning policy on 20
minute neighbourhoods
and community wealth
building in NPF4
Through the LDP
process develop a
spatial strategy and
associated policy
direction that supports
the creation of 20
minute neighbourhoods
and the principles of
community wealth
building. 
Submission of
Evidence Report
Approval of proposed
Plan
Adoption of Plan 
March 2024 
Oct 2025 
March 2027
23 Look to ensure that Council-
led physical regeneration
schemes have input from
other anchor institutions and
key partners and enable
sharing and participation form
the community and voluntary
sectors. 
23.1
Engage with public,
private and voluntary
sector partners to
marry -up aspirations
and pool funding to
add value and deliver
one-stop service
provision
Ensure cross sector-
partners are aware of
planned projects and
opportunities for
collaboration
October
2022
(Annual) 
41

Page 42

Finance 
Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
24 Through our relationship
with the councils Pension
Fund provider, Strathclyde
Pension Fund, look to
develop and support their
work on providing
opportunities for more local,
sustainable investment
opportunities 
24.1
We will look to approach
the pension fund to
explore further
opportunities for
investment in local areas. 
Other councils, with a
similar interest, may wish
to make a joint approach 
Through officers initially,
we will approach SPF to
ask for options to be
considered for
opportunities for local
investment. 
Considerations to be
developed along side
SPF following initial
discussions of possible
areas.  
March 2023
25 Building on the relationship
we already have with local
Credit Unions, we will work
locally with the credit unions
and other community
partners to explore ways to
encourage use of the
savings and affordable credit
facilities which they offer 
25.1
Establish working
relationships with CUs
and community partners
to promote savings and
affordable credit
Engage with Credit
Unions to establish
shared priorities and
linkages to CWB
Strategy
March 2023
Establish a Credit Union
Network
March 2023
Develop and promote
new financial services to
communities
October
2023 
26 Encourage SLC staff, those
of other anchor institutions,
local businesses and
residents to spend locally
and retain investment in
local businesses and
promote local green tourism  
26.1
Run “shop and spend
local “campaigns to
increase awareness of
locally available goods
and services 
Through economic and
tourism strategies develop
additional marketing and
networking opportunities for
local businesses and social
enterprises 
March 2023
Via our Business Gateway
contractor and our business
grants programme ensure
that local companies have
the knowledge and funding
to run and develop effective
promotional and social
media campaigns
March 2023
Encourage local trading
networks
March 2023
Case-study local
businesses via our website
and the local press 
March 2023
26.2
Raise awareness of what
is on offer for days
out/recreation/culture,
events in South
Lanarkshire 
Provide an events calendar  March 2023 
42

Page 43

Building the generative economy 
Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
27 Continue to develop how
business grants can help
grow communities 
27.1
Offer targeted support to
South Lanarkshire
businesses, enabling them
to create and safeguard
jobs, increase turnover
and profit 
Develop sector specific
programmes (tourism,
food and drink, social
enterprises, green
economy, construction,
manufacturing etc)
March 2023
(Annual)
Tailor SLC grants to
business needs with a
new micro-grants
scheme for small and
start up businesses with
minimum red tape.
March 2023
(Annual)
Offer larger growth and
recovery grants to
business, based on jobs
created and increased
turnover. 
March 2023
(Annual)
Signpost businesses to
other sources of help and
advice
March 2023
(Annual)
28 Promote investment
opportunities to regional and
national institutions to market
South Lanarkshire as a place
to visit and do business 
28.1
Develop a
marketing/investment
strategy, including a
promotional programme
with targeted/seasonal
events and promotions
around key employment
sectors. 
Create a site prospectus March 2023
(Annual)
Improve web presence/
on line material 
Ensure planning and other
statutory advice is up-to-
date and accessible
March 2023
(Annual)
29 Work with our partners to
support organisations which
offer volunteering
opportunities 
29.1
New Volunteering strategy
for the Community
Planning Partnership 
Develop a comprehensive
Volunteering Strategy 
Agreed by
CPP in June
2022
Implement Strategy September
2022 and
reviewed
annually 
30 Create a positive
environment for third sector
organisations where local
anchors offer development
support 
30.1
Develop a comprehensive
mapping of anchor Third
Sector organisations
Engage with Third sector to
map key anchor
organisations and existing
strategic relationships
December
2022
30.2
Develop a new strategic
agreement with the Third
Sector 
Establish a high level
review group and
comprehensive
engagement process for the
review
March 2023
30.3
Implement the new
strategic agreement with
the Third Sector 
High level strategic
agreement group
overseeing actions
October 2023
then annual
review
43

Page 44

Ref We will: High Level Actions Steps we will take to
deliver this action
Timescales 
31 Support our social
enterprises and key Third
Sector organisations to
generate more of their own
funding 
31.1
Review funding to the
Third Sector 
Establish a cross-partner
review group and agree
terms of reference
March 2023
Conduct review agree
proposals
Year 2
Implement new funding
arrangements for Third
Sector
Year 3
32 Develop a new Social
Enterprise Strategy and
Action Plan and, in
conjunction with the social
enterprise sector, establish a
Social Enterprise Steering
Group 
32.1
New SE Strategy & Action
Plan produced
Establish a Strategy
Development Group
including partners and
representatives of the social
enterprise sector
March 2023
Social enterprise advisor
recruited into Economic
Development 
March 2023
32.2
Social Enterprise Steering
Group established
Agree membership and
terms of reference
February
2023
33 Encourage Partnership and
Consortium development in
the social enterprise sector to
compete for public contracts
33.1
Clear understanding of the
market for social
enterprise across South
Lanarkshire 
Work with the social
enterprise sector and SDP
to understand the market
and supply chain
March 2024
33.2
Coproduction of key
responses to social
enterprise market
Identify, publicise and
market opportunities for the
social enterprise sector
March 2024
33.3
Develop consortia and
partnership responses to
social enterprise market
opportunities
Work with procurement on
meeting market demand
through social enterprise
interventions
March 2024
Then annual
reporting
44

Page 45

Report
Agenda Item 
Report to: Community Wealth Building Commission  
Date of Meeting: 6 September 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community Wealth Building – Town Centre Update 
1. Purpose of Report
1.1. The purpose of the report is to: - 
 Update the commission on town centre project work which meets CWB
objectives 
2. Recommendation(s)
2.1. The Community Wealth Building Commission is asked to approve the following
recommendations: -
]
(1) that the way in which town centre activity supports CWB as set out in this report
is noted 
3. Background
3.1.  The nature of town centres across the UK is in a transitional stage. The range
of issues involved in the challenges town centres are facing are broad and
complex. Factors such as the economic downturn, internet shopping, the
growth of out of town shopping malls, changes in retailers’ business models
and consumer expectations have resulted in a decline in footfall. 
3.2 Some of the issues are local and specific to individual towns, however, many
are issues seen across the country influenced by wider economic patterns,
consumer behaviour and corporate decisions. Supporting town centres
remains a Council priority and officers continue to work in partnership with
groups and organisations in each town to achieve our common goals. 
3.3 The role town centres have in our communities is significant and therefore their
role in CWB cannot be understated. Town centres support and contribute to
each of the 5 community wealth building pillars and are often the location of
many of the anchor organisations who are vital to the delivery of CWB
objectives. 
3.4  Around 70% of businesses and jobs in the economy are located in town
centres and they are the principal location for leisure and hospitality. They
retain a vital social importance as a meeting and events and performance
space. 
4. CWB In Action
4.1 The Council received funding from the Scottish Government, in common with
all Local Authorities, to support our town centres to bring forward
8
45

Page 46

transformational change for the communities they serve. Unlike many
authorities South Lanarkshire chose to invite bids from communities to deliver
the most effective programme of projects across our communities. 
4.2 The outcome of this approach has been a number of innovative and
community focussed projects which support the towns and their communities
but are also delivering CWB objectives and supporting 20-minute
neighbourhoods. These projects and initiatives are listed in appendix 1 and 2
to this report which shows the CWB pillars for each and include: 
• In Carnwath the local Community Council have brought forward
development proposals on a disused site at the edge of the town centre.
The initial funding has allowed the site to be acquired and acted as a
catalyst for other funders to get behind the project. The previous owner
carried out decontamination works as part of the project and the
community are now progressing to the delivery phase of their building
prioritising local contractors where possible. 
Following the success of this initial phase a subsequent application was
supported under the Place Based Investment Programme to support the
acquisition and refurbishment of an empty retail unit in the town which the
community will run on a not for profit basis with any surplus reinvested in
community events and initiatives. The combination of these initiatives will
support this community over many years through the delivery of CWB. 
• Forth – the Community Council applied to the Council to support their
community cinema and café located in the hall of one of the churches at
the centre of the town. The community have delivered all aspects of the
project using local contractor and suppliers where possible. 
The community are now in the process of delivering a second phase
through the Place Based Investment Programme which will combine this
facility with an outdoor community facility at the heart of the town centre
and potentially buying the asset from the church. 
• Bothwell – the Community Council applied to the Council to support the
delivery of a community facility in the town library which was not being
used to its full potential. The application covered the cost of refurbishing
the property which has a number of backlog maintenance issues and
acted as a catalyst to apply to other funders to cover the cost of a
community asset transfer from the council and additional refurbishment /
conversion works. The group have pulled together an extensive and
ambitious scheme which will see the completed project become an
important community facility generating income for a range of other
community projects, events and initiatives. The community are delivering
all aspects of the project using local contractor and suppliers where
possible. 
• Hamilton Newcross - The Hamilton Hub @ New Cross sees the
development of a £1.5 million regeneration project which will transform
920sqm of vacant retail space into a thriving community and enterprise
hub in the heart of Hamilton town centre. The Hamilton Hub will be a
dynamic centre for business start-ups and local enterprise and will be a
focal point for the delivery of projects, initiatives and services with an
employment, skills and health and wellbeing focus and will have a
46

Page 47

significant impact on the economic, physical and social regeneration of
Hamilton Town Centre. 
The Hamilton Hub @ New Cross, as a multi-agency centre, will ensure vital
services and organisations are accessible for local people. As well as bespoke,
dedicated office space, the hub will offer IT enabled meeting room, event and
near to home working space for the wider community. The council has used
its commercial property asset and the availability of funding from the Town
Centre Capital Fund, Place Based Investment Programme and the
Regeneration Capital Grant fund to deliver a facility which will become an
important focal point for business, the community and the third sector. 
5. CWB Pillars in town centres
5.1 The work in town centres which supports CWB is broad and links directly to
each of the CWB pillars. While town centres are more directly tied to the
delivery of some pillars. The examples below illustrate practical delivery under
each pillar. 
• Building a Generative Economy - Community assets funded through town
centre funding which will give communities an asset to support
community projects – see Carnwath, Forth and Bothwell above
• Finance - supporting the introduction of the Scottish Government’s
Scotland Loves Local Gift Card aimed at keeping spend in local
communities
• Land and Property - use of Public assets such as the Newcross centre
and the Vogue in Hamilton to bring forward development and improve
wellbeing in town centres
• Spending - focus on local procurement for construction and other
contracts. Use of the Council’s financial scale to support the relocation of
UWS to a new campus in South Lanarkshire with a South Lanarkshire
based development partner and
• Workforce - working with the Landlords in East Kilbride to ensure new
leases in developments have clauses designed to increase engagement
with local employment markets and training programmes 
6.  Town Centre Action Plan (TCAP) in South Lanarkshire supporting CWB
6.1. The TCAP presents an opportunity to continue to build on the work of Local
and Scottish Government to prioritise town centres in a way which has not
previously happened, with the goal of positioning them as a central economic
objective. 
6.2 Officers continue to work closely with all our communities to tailor solutions to
the specific challenges to each of our towns. It is widely recognised that there
is no single approach which will address the challenges of all towns and while
the TCAP provides a useful baseline, officers and communities must tailor our
approach to maximise the opportunities based on local need. To date actions
plans have been delivered for Cambuslang, Hamilton, Blantyre and Larkhall. 
6.3 Town centre priorities are at the heart of the Community Plan and Community
Wealth Building strategies and the TCAP gives strong support to the delivery
of these wider objectives. 
6.4 Officers in Economic Development are working with all key stakeholders
across our towns and have commissioned 2 key pieces of work to set the
direction of the Council’s work around town centres going forward. These will
47

Page 48

inform and align with existing and emerging funding opportunities around town
centres  
• Town Centre Visioning – this will set out how the Council delivers on the
strategic aims and objectives at a local level. As noted above, while all
towns have similar challenges, the solutions are not always the same.
This work will set out how the Council, communities and partners should
deliver meaningful and sustainable change within our town centres
through a series of projects and action plans. 
• Transition to Net Zero – town centres are major contributors to pollution
and although a number of early wins have been achieved, the ways to
deliver long term meaningful and sustainable reductions are complex and
not always palatable to business or customers. This work will set out a
practical approach to working towards net zero across our towns. 
6.5 In parallel, officers across Planning and Economic Development and Roads
and Transportation services are liaising to consider how the delivery of the
Council’s statutory services can complement the ever-changing requirements
of our town centres. 
7. Next Steps
7.1. The town centre strategies and action plans and the delivery of capital projects
along with our ongoing engagement with appropriate partners across each of
our town centres is complementary to the objectives of the TCAP. The format
used for our 4 Town Centre Strategies and Action Plans (Hamilton,
Cambuslang, Larkhall and Blantyre) is likely to evolve moving forward to reflect
the changes in planning legislation and increased alignment to the CWB
strategy. 
7.2. The delivery of exiting projects funded through the Town Centre Capital Fund,
Regeneration Capital Grant Fund and Place Based Investment Programme
are key to supporting the continued recovery and realignment of our town
centres. 
7.3 Continued engagement with the key stakeholders and communities in each
town is also vital in the delivery of projects and initiatives. 
7.4 The continued roll out and promotion of the InsideOut app will support
business and communities allowing them to communicate and engage in ways
not previously possible. 
7.5  There are also a number of other emerging initiatives at a regional and national
level which could have a positive impact on our town centres not least the
Shaping Places for Wellbeing initiative recently confirmed in Rutherglen on
which officers across the Council are working with colleagues in NHS
Lanarkshire and the third sector to look at how we can deliver meaningful
change in our communities. 
8.  Employee Implications
8.1. There are no employee implications associated with this report. 
9. Financial Implications
9.1. There are no financial implications associated with this report.  
48

Page 49

10. Climate Change, Sustainability and Environmental Implications
10.1. There are no implications for climate change, sustainability or the environment
in terms of the information contained within this report. 
11. Other Implications
11.1. Failure to demonstrate that risk is actively considered and managed could
adversely affect the delivery of the CWB strategy and could affect the
reputation of the council.  The work undertaken to identify and review the risks
and monitor the progress of the risk control actions will enable the CWB Group
to effectively manage the impact of these risks. 
12. Equality Impact Assessment and Consultation Arrangements
12.1. There are no Equality Impact Assessment or consultation arrangement
implications associated with this report.   
David Booth
Executive Director (Community and Enterprise Resources) 
25 July 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information,
please contact:- 
Iain Ross Project Manager
Ext:  4951 (Tel: 01698 454951)
E-mail:  Iain.ross@southlanarkshire.gov.uk 
49

Page 50

Appendix 1 
Years 2021/2022 – Curent Progress Report 
Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
1
TCCF
Royal Oak,
Lanark
Social rented
housing
development on the
site of a derelict
hotel.
Development
has all
statutory
consents in
place and work
began on site
in April 2021
with
completion
expected in
mid-2022
£345k / 
c£4m
✓ ✓ ✓ ✓ 
2
TCCF
Former
Hamilton
Advertiser
Building,
Hamilton
Social rented
housing
development on the
site of a former print
works
Demolition
works are
complete, and
the main works
are
progressing
well.
Completion
spring 2022.
£300k /
£3.2m 
✓ ✓ ✓ ✓ 
3 
TCCF
East Kilbride
Shared
Workspace
To create 10,000 sq.
ft. of business start-
up space on floor 7
of Plaza Tower. 
Private sector
match funding
could not be
secured,
n/a     
50

Page 51

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
Funds of £200k
reallocated to the
Civic Centre
feasibility project 
project not
proceeding
4
TCCF
Vogue Site,
Hamilton
Social rented
housing
development on the
site of a former
bingo hall 
Progress has been
slower than
anticipated due to
COVID restrictions
and changes in
personnel however
programme should
still be achievable.
Planning
application
lodged. 
Site
investigations
and essential
repairs carried
out.
Contracts in
place to
proceed.
Council
approval to
dispose of site
to RSL
obtained
March 2021. 
£440k 
c£4.3m
✓ ✓ ✓ ✓ 
5
TCCF 
Former
Poundstretcher,
Hamilton
Redevelop the
Poundstretcher site
as a mixed use
residential/retail
development. 
Funds of £180k put
back into the
Property could
not be secured
- project not
proceeding
n/a     
51

Page 52

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
programme to
support phase 1
delivery.
6
TCCF
Cambuslang
Streetscape
Streetscape
improvements
including pavement
resurfacing.
Works
progressing
well despite
some delays
around
materials.
Completion
mid 2022
£845k ✓ ✓ ✓ ✓ ✓
7
TCCF
South
Lanarkshire
Heritage App
Development of a
South Lanarkshire
wider town centre
app. 
Second phase
role out in
progress with
the 7 more
towns part of
the launch.
Promotional
activity
underway.
£150k / 
£240k
✓  ✓  
8
TCCF
Forth Café and
Cinema
To create a cinema
and kitchen café in
town centre hall for
community town
centre events and
increase town centre
footfall.
Works
complete 
£60k  ✓ ✓ ✓  
52

Page 53

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
9
TCCF
Carnwath site
assembly
Acquisition of a
derelict site to
facilitate a
community project
Acquisition will
be finalised on
completion of
remediation
works by
existing owner. 
Development
subject to
other funding
which is now in
place. 
£336k / 
£650k
✓ ✓ ✓  
10
TCCF
Hunters Close,
Lanark
Removal of a
derelict building and
creation of town
centre car parking /
market space. 
Works
complete 
£275k   ✓ ✓ 
11
PBIP
Rankin Gait,
Carluke   
Regenerate the
Rankin
Gait Precinct
creating the Rankin
Gaitway Community
Space.
Design and
procurement
work
progressing in
line with
programme
£100k    ✓ 
12
PBIP
Carnwath
Community and
Enterprise
Hub) 
Acquire retail
premises and hold
for the future benefit
of the community. 
Initial delay
regarding
issues in
relation to
ownership
issues.
Checked and
£25k ✓ ✓ ✓ ✓ 
53

Page 54

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
corrected.
Negotiations
and legal work
being finalised. 
13
PBIP
Forth Business
and Outdoor
Development 
Creation of an
outdoor space to
expand the
Rainforest Cafe at
Forth St Paul's
church and provide a
safe space for
various activities
Design
complete and
procurement
works
progressing.
legal search
uncovered sale
issue. Being
progressed 
£95k ✓ ✓ ✓  
14
PBIP
Welcome to
Larkhall 
The project aims to
improve the
appearance of the
main shopping
street, making it
more attractive to
shoppers and
visitors.
Project 1
heating
complete
Project 2
streetscape –
Progressing
material hold
up. 
Project 3 –
consultation on
John street
completed 
£100k    ✓ 
15
PBIP
Rutherglen
Town Centre
Business
Creation of a
business hub
providing space for
Works
completed
April 2021
£100k ✓ ✓   ✓
54

Page 55

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
Support  new starts and/or
existing business. A
design improvement
to extend the
frontage of the
shopping centre to
include all shops. 
16
PBIP
Development of
the Thomson
Suite
in the Town
Mill,
Strathaven 
Development of the
Thomson Suite
in the Town Mill,
provision of a tourist
information point in
the town centre and
further development
of the Strathaven
InsideOut app.
Strathaven Mill
90%complete
Tourist point
50% complete
Strathaven
heritage app
addition 100%
complete
£100k    ✓ 
17
TCCF
PBIP
RCGF
Newcross
Centre Hub
Community/business/
enterprise hub which
will include office
space, private and
shared facilities for
businesses, a
community café,
youth activities and
business start -up
space
Cost saving exercise
required which has
delayed programme
Design
complete and
works out to
tender 
£550k /
1.57m 
✓ ✓ ✓ ✓ ✓
55

Page 56

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF 
18
TCCF
EK Civic
Masterplan
Feasibility work
regarding the
potential to move out
of the Civic Centre
which is
underutilised and no
longer fit-for-purpose
investigate, and
commission design
work aimed at
relocating remaining
Council services into
the East Kilbride
shopping mall.
Negotiations
proceeding
with Town
Centre Owners
and design
progressing 
Following a
period of
transition, the
new asset
team
representing
the Town
Centre have
renewed the
commitment to
working with
the council to
deliver on this
programme.
£201k / 
TBC  
✓  
19
TCCF
Near to Home
Working
Pilot project to
provide flexible
business space for
people who are
working from home
Transport
Scotland have
put the project
on hold due to
concerns over
budget and the
availability and
cost of
materials.
£175k     
56

Page 57

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
20
RCGF
EK Zone  Community /
business / enterprise
business space
alongside other
public and voluntary
sector partners 
Funding
application
unsuccessful.
Project on hold
until alternative
funding
secured. 
Refreshed
application
being prepared
for RCGF 2021
N/A     
21/1
PBIP
(feasibility)
Lesmahagow  Lesmahagow
Development Trust 
Feasibility
planning for
Mc Curdy Park
and town
centre
streetscape
improvements.
Group not able
to complete
application and
works in
required
timescale,
slipped to
2022/23
program 
Now in
2022/23
project
costs   
✓ 
21/2 Rutherglen  Grow 73 Feasibility of
additional
community
£10k ✓  ✓  
57

Page 58

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
PBIP
(feasibility)
garden at
allotment site 
21/3
PBIP
(feasibility)
Blackwood  Blackwood Estate
Community
Organisation 
Delivery of
access to
outdoor
learning areas
at Loch Wood,
Blackwood
Estate
£10k   ✓  
21/4
PBIP
(feasibility)
Lanark  Discover Lanark – Feasibility on
options for
outdoor
seating
£10k     
21/5
PBIP
(feasibility)
East Kilbride  Kirktonholme
pavilion
Feasibility for
improvements
to make DDA
compliant –
£10k     
21/6 PBIP
(feasibility)
Hamilton  Regent Centre  Master-
planning
project 
£50k     
21/7
PBIP
(feasibility)
Cambuslang  Silverbank car park
– Adjacent to
Cambuslang town
centre.
Car Park
Resurfacing 
£50k  ✓   ✓
21/8 Bothwell Library CAT Asset transfer
agreed 
£28k ✓ ✓ ✓  
58

Page 59

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
PBIP
(feasibility)
21/10
PBIP
(feasibility)
Allanshaw
Industrial
Estate
Entrance Signage
Improvements 
Specialist legal
issues re
existing
signage,
procurement
delayed by 12
months.
Currently being
costed 
Now in
2022/23
project
costs     
21/11
PBIP
(feasibility)
Allanshaw
Industrial
Estate 
Roads design and
repair 
Completed  £25k  ✓   ✓
21/12
PBIP
(feasibility)
Biggar  Solar energy pilot Community
group not in a
position to
complete 
n/a     
21/13
PBIP
SLLC Bid Avon Bridge design
and procurement – 
Survey of
structure to
assess repair
needs.
Specialist
procurement
delayed by 12
months. 
Now in
2022/23
project
costs 
✓   ✓
59

Page 60

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
22
PBIP
Halfway
Community
Council 
Park refurbishment
at Halfway Park
including play
equipment,
drainage, and paths
Design and
procurement
work
progressing.
Material and
tendering
delay post
Covid due to
price
£100k   ✓ ✓ 
23
PBIP
David
Livingston
Centre 
Allow works which
had to be removed
from the original
scope to achieve
cost savings to be
reinstated. These
include external
features such as
landscaping, play
and picnic areas and
paths linking to the
Clyde and town
centre.
Design and
procurement
work
progressing in
line with
programme
£400k ✓ ✓ ✓ ✓ ✓
24
PBIP
Mitchell Arcade
Rutherglen 
Bring forward a
package of
improvements which
will support the town
centre, business and
social enterprise.
Design and
procurement
work
progressing in
line with
programme
£370k ✓ ✓ ✓  ✓
25 Newcross
Centre HUB 
(Project 17)
Allow works which
had to be removed
from the original
See project 17  ✓ ✓ ✓ ✓ ✓
60

Page 61

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spd WF
PBIP scope to achieve
cost savings to be
reinstated.
26
PBIP
Bothwell
Community
Council
Support projects in
the Bothwell Futures
community plan.
Design and
procurement
work
progressing in
line with
programme
£150k ✓ ✓ ✓   
61

Page 62

Appendix 2 – 
2022/2023 - Proposed Project List   
Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spnd WF
30 - PBIP Larkhall   SLLC - Larkhall
Liesure Centre
Support for
construction of
new Leisure
Centre on site
of existing
pool facility. 
£550,000 ✓ ✓ ✓ ✓ ✓
31 -PBIP Carluke Carluke
Development Trust-
Feasibility
Feasibility
study of town
centre derelict
properties for
Asset Transfer
and
refurbishment. 
£10,000   ✓  
32 - PBIP East Kilbride East Kilbride United
– Kirktonholme
pitches
Kirktonholme
all-weather
sports field
designed
specifically for
use by
disabled
athletes. (Now
potential 23-
24 project)
£    -   ✓  
62

Page 63

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spnd WF
33 - PBIP East Kilbride East Kilbride United
– Kirktonholme -
changing rooms
Upgrade and
environmental
improvements
to separate
the showers
and toilet
areas to allow
full use by
male, female,
older and
disabled
members,
athletes and
visiting clubs. 
£185,000     
34 - PBIP Biggar Feasibility - Biggar
Youth Project -
Biggar Youth
Project (BYP)
's premises
refurbishment
to improve
insulation and
energy
efficiency and
redesign the
internal space.
£55,000   ✓  
35 - PBIP Lanark Discover Lanark -
Outdoor space
construction on High
Street
The
construction of
an outdoor
community
space in the
town centre.
£289,000    ✓ 
63

Page 64

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spnd WF
Successfully
trialled during
COVID. 
37 - PBIP Hamilton SLC - Allanshaw Signage
Project
brought
forward from
2021
£50,0000     
38 - PBIP Hamilton SLC - Avon Bridge Assessment
and repair
project
brought
forward from
2021.
£126,000    ✓ 
39 - PBIP Rutherglen Grow 73 - Allotment
space
New
community
growing space
(now 23-24
potential
project)
£       -     
40 - PBIP Forth Forth Development
Trust – Asset
Transfer and
improvements
Asset transfer
from the
church of
Scotland to
the community
and roof repair
of church hall
£160,000 ✓ ✓ ✓  
41 - PBIP Hamilton SLC - Quarry Street 18 – 22
Quarry Street
purchase
£75,000  ✓ ✓ ✓ 
64

Page 65

Project
Number
FUND 
Name Summary Update  Project
Value
Grant /
project
value
GE Fin L&P Spnd WF 
42 - PBIP Rutherglen SLC - Fernbrae Enlargement
of the car park
£60,000     
43 -PBIP Lesmahagow Feasibility -
Lesmahagow
Development Trust
–
Upgrade and
environmental
improvements
to Billy's store.
Development
trust owned
asset on Main
Street to RIBA
Stage 4.
Moved from
21/22
£60,000     
22 - PBIP Halfway
Community
Council
SLC - Park
refurbishment at
Halfway Park
including play
equipment,
drainage, and paths
Design and
procurement
work
progressing.
Material and
tendering
delay post
Covid due to
price. Moved
from 21/22
£100,000   ✓ ✓ 
44 - PBIP Lanark SLC - Lanark
racecourse
Masterplan
Support
delivery of a
masterplan for
Lanark
Racecourse
site.
£20,000   ✓   
65

Page 66

66

Page 67

9
67

Page 68

Contents 
Introduction 
What is Community Wealth Building? 
Our Community Wealth Building journey 
Progress and case studies 
• Spending
• Workforce
• Land and property
• Finance
• Building the generative economy 
Conclusion 
68

Page 69

Introduction 
In March 2021 South Lanarkshire launched its Community Wealth Building Strategy. 
The strategy set out an aspiration to work in a new way for the people of South
Lanarkshire, to use the power and Influence of the council and other organisations to
support communities and the South Lanarkshire economy. 
We live in uncertain times, and the challenges we face – from the impact of the
pandemic to the effects of climate change to geo-political upheavals – show us more
clearly than ever before the value of local services rooted in local places and
communities.   
South Lanarkshire Council and the South Lanarkshire Community Planning Partners
are committed to improving the lives and prospects of everyone in South
Lanarkshire.  We recognise and celebrate our role as key anchor organisations,
delivering services across the area, championing South Lanarkshire and working
ceaselessly for the benefit of those who live, work, visit and do business here. 
This annual report reflects on the first year of delivering our Community Wealth
Building Strategy.  It highlights the progress we have made so far and reaffirms our
determination to continue the journey, continually seizing opportunities to build the
wealth, capacity and resilience of our communities.  We have drawn upon a wide
range of case studies to illustrate Community Wealth Building in action, showing how
the council and partners, working alongside communities, can use their energies,
influence and resources to generate real change across South Lanarkshire. 
Chair of the Community Wealth Building Commission 
69

Page 70

What is Community Wealth Building? 
Community Wealth Building is an alternative approach to traditional economic
development, which seeks to develop resilient, inclusive local economies, with more
local employment and a larger and more diverse business base. 
Community Wealth Building reorganises local economies to be fairer and aims to
reduce wealth flowing out of our communities, towns and cities by helping local
investments and assets to generate more and better jobs for local residents and
businesses. 
To achieve this transition, CWB harnesses the power of anchor institutions to enable
local economies to grow and develop from within. Anchor institutions are large
commercial, public and social sector organisations which have a significant stake in
a place and can exert considerable influence on their local economies. 
CWB changes how anchor organisations work to maximise local and regional
economic opportunities. This includes the goods they buy, the people they employ,
the assets they own and the powers they exercise to bring about long-term,
sustainable economic change for the benefit of local communities and local
businesses. 
5 strategy areas are identified relating to the pillars of community wealth building. 
These are: 
• Building the generative economy - Develop and grow small, locally owned
enterprises which are more financially generative for the local economy -
locking wealth into place.
• Finance - Increase flows of investment within local economies by harnessing
and recirculating the wealth that exists, as opposed to attracting capital.
• Land and property - Deepen the function and ownership of local assets held
by anchor institutions, so that financial and social gain is harnessed by
citizens.
• Spending - Utilise public sector procurement and commissioning to develop
dense local supply chains of businesses likely to support good employment
and retain work locally.
• Workforce - Exercise fair employment practices and work to develop a more
just labour market to improve the prospects and wellbeing of local people. 
70

Page 71

Our Community Wealth Building journey 
From the start we have been clear that we need to build CWB into everything we do. 
We need to ensure that CWB becomes part of a new culture and way of working –
and to do this we need the change in thinking to be led from the top.  That is why we
moved quickly to establish a Community Wealth Building Commission which has
cross-party political support and engages senior officers from South Lanarkshire’s
anchor organisations. 
The Community Wealth Building Commission is a key vehicle for setting vision and
promoting
the development of a strategic approach to CWB in South Lanarkshire.  By working
together collaboratively across the five pillars of CWB, anchor organisations can
multiply their effectiveness and deliver far-reaching transformational change. 
Turning strategic aspirations into action on the ground is the job of the CWB
Progress Group.  This group is chaired by VASLan, and aims to take the practical
steps necessary to deliver the actions underpinning the CWB strategy. 
Our Community Wealth Building journey is shown below. 
SLC established a working group to examine the CWB
approach and develop recommendations
November 2020
SLC approves a CWB strategy March 2021
SLC agrees to the creation of a CWB Commission May 2021
CPP Board considers a report on the creation of a CWB
Commission
June 2021
CWB Commission established – first meeting August 2021
Detailed action plan agreed for Strategy August 2021
Progress Group agreed by Commission October 2021
Progress Group established – first meeting January 2022 
As our timeline shows, much of our effort has gone into getting the right people into
the right place to ensure the strategy works as a whole, across all 5 pillars, from the
strategic to the operational level.  This strategic, whole-systems approach is still in
the early stages, but is already bearing fruit, as this annual report illustrates. 
In our strategy we set out what we would do under 5 pillars of Community Wealth
Building.  We developed an action plan to support our strategy, setting out detailed
actions we would take in the first years of Community Wealth Building in South
Lanarkshire.  Our progress is illustrated in the remainder of this report. 
71

Page 72

Spending 
The spending pillar is about leveraging public sector procurement and
commissioning to develop dense local supply chains of businesses likely to support
good employment and retain work locally. 
Our Strategy set how we would achieve this, starting with analysis of our spend and
a range of actions to make procurement processes simpler and more accessible to
local businesses. 
Key achievements
• Changes to the council’s Quick Quote process have enabled the council to
use this route for more contracts and to make it more accessible for local
suppliers.  A bespoke event on these changes was delivered in February
2022 (see case study below)
• The council has undertaken a Gap Analysis and identified a need for work to
be done with SMEs to build skills and knowledge to help them access and
navigate opportunities to secure council contracts.
• A local market analysis has been completed to identify opportunities for local
growth working with the Lanarkshire Economic Development Forum.
• Meet the real buyer events and quickquote webinars – together with
increased use of Facebook, Twitter and Linkedin) – have advertised
opportunities to potential bidders.
• The benefits of the Supplier Development Programme have been promoted,
with NHS Greater Glasgow and Clyde and NHS Lanarkshire commissioning
SDP to deliver a project to increase diversity in their supply chains (see case
study below)
• New ways of identifying and delivering community benefits are being
explored.  NHS Lanarkshire, for example, has used the NHS Community
Benefits Gateway to connect NHSScotland suppliers with local third sector
community organisations (see case study below).
• A new Community Benefits Officer post has been created within the council to
take forward increased levels of community benefits and identification of
opportunities to improve community outcomes. 
How it’s working in South Lanarkshire: 
Case study 1: South Lanarkshire Council Quick Quote developments 
Initial Quick Quote pilot exercises generated 9 procurement processes: in total, 17
local companies were among those engaged in the competitive process with 2 local
awards being made. The value of works awarded in the South Lanarkshire area
totalled £30k, with other successful contractors including 6 awards to companies
based in Glasgow City Region and only 1 to the wider Scottish area. These initial
quick quotes generated useful lessons learned for new local companies which were
shared through the webinar. A programme of projects to be progressed through
Works Quick Quotes in 22/23 is being considered as part of the Procurement
Service Planning exercise and outcomes will continue to be reviewed to monitor the
72

Page 73

impact of the change and ensure that appropriate guidance can be offered to local
SMEs. 
Successful Quick Quote webinar hosted by Council Procurement Team and Supplier
Development Programme in February 2022 with 78 SME attendees, including 23
South Lanarkshire based business and 18 from North Lanarkshire. The event
focused on guidance to local suppliers on how to approach bidding for Quick Quotes,
with emphasis on the lessons learned from the pilot exercises. This included the
importance of adhering to the Council’s programme timescales, providing a full
response to all technical questions (seeking clarification through the messaging
facility on PCS/PCSt if required) and ensuring that all required attachments,
including insurances, are provided. The Supplier Development Programme also
provided a training session on how to bid through Public Contracts Scotland and
positive feedback was received from attendees in respect of both the presentations
and training. 
Case study 2: NHS Lanarkshire Community Benefits Gateway 
NHS Community Benefits Gateway (CBG) is a free and easy to use online service
that connects NHSScotland suppliers with third sector community organisations
within Scotland. CBGs purpose is to establish a positive relationship between
appropriate suppliers and third sector community organisations through the fulfilment
of community needs. 
It supports community initiatives ranging from work placement opportunities and
volunteering projects to environmental proposals and assistance with building
community facilities. 
In South Lanarkshire, NHS Lanarkshire has worked with VASLAN to promote the
CBW to third sector organisations in the area. One example of how this has worked
for the benefit of communities is ARCO and Action for Children. 
Arco’s funding of the Silverton Hub has enabled Action for Children to employ a
Community Short Breaks Practitioner to support families with disabled children in
Lanarkshire to have greater access to community-based support. The Community
Support Worker is based at the recently refurbished Silverton Community Hub, a
centre specially designed to support children and young people with complex
learning difficulties and a range of physical health needs in Hamilton. Staff at the
community hub provide personalised support, helping children to overcome barriers
that may hinder their involvement in the local community. Staff facilitate access to
local community-based facilities, resources, networks and amenities, including
swimming pools, gyms, youth groups, green spaces and museums. This empowers
the children to pursue their own personal interests and preferences while growing
their confidence, social skills and reducing isolation by supporting children to form
new friendships. 
ARCO’s funding has enabled Action for Children to run groupwork sessions for
young people, including Halloween activities and planning sessions with the children
to discuss ideas for “side-by-side” trips at Easter. For many of our families these
opportunities rarely exist to create long-lasting memories. Activities like this
73

Page 74

unsupported can be stressful occasions for a child with autism that then impacts on
the whole family. But our professional team will be on standby to step in to support
the family and allow them to feel less anxious and more present, and to see their
child have fun. 
ARCO’s funding has also enabled Action for Children to employ a
Trainer/Qualifications Assessor to support Action for Children’s Youth Employability
Project. This helps young people breakdown barriers to employment, addressing
these through valuable employability skills and vocational training, developing their
aspirations, ambition and future job goals by encouraging their interest in learning. 
Over the first three months of utilising the ARCO funding we have been working to
increase our capacity to deliver accredited qualifications and learning opportunities
for young people we support. This funding is enabling us to include previously
ineligible young people to our training programmes and we are now able to offer
accredited learning opportunities to our wider services across Action for Children in
our Fostering, residential, housing support, youth justice, family, and community-
based services. 
Case study 3: NHS Lanarkshire Supplier Development Programme 
Addressing inequalities across Lanarkshire has been identified as an overarching
aim of the new NHS Lanarkshire healthcare strategy, ‘Our Health Together’. There
has been a strong commitment to maximising our role as an anchor institution and
as part of this we have been undertaking a baseline assessment over the last few
months. 
Part of the baseline assessment was to review our procurement processes against
the following anchor objective: Engage with existing and potential new suppliers and
increase the proportion of spend with local suppliers. 
In the financial year 2020/21 approximately 50% of NHS Lanarkshire’s external
expenditure was via contracts awarded by the health board through local contracting
activity. The remaining 50% was via contracts awarded by NHS Scotland National
Procurement or other collaborative procurement organisations. NHS Lanarkshire
therefore has significant scope to direct external expenditure in a way that optimises
our influence as an anchor institute. To do this we identified improvements which
could be made in relation to engagement with and the diversity of our procurement
supply chain. 
Our colleagues in NHS Greater Glasgow and Clyde (GGC) recently had a successful
bid to the Health Foundation to undertake a pilot in partnership with the Supplier
Development Programme and we intend run a parallel project in NHS Lanarkshire
and work alongside NHS GGC to implement improvements in this area. 
This will ensure that all local authorities and NHS boards across the Glasgow City
Region are maximising their influence on the economy of their local area through
progressive procurement methods. It will also bring us in line South Lanarkshire
Council’s procurement and our collective Community Wealth Building aspirations. 
74

Page 75

NHS Lanarkshire’s Procurement and Public Health/ Health Improvement teams will
work in partnership with the Supplier Development Programme to deliver a project
that aims to diversify its supply chain. 
The project aims to encourage a wider pool of suppliers, support more local SMEs to
become suppliers, and will focus in particular on increasing diversity. 
The analysis stage of the project will: start with a review of existing supplier data by
NHS Lanarkshire; gathering knowledge about the local SME base; and, more widely
understand diversity within the supplier base in Lanarkshire. This will include
businesses led by, for, and with, people with protected characteristics (supporting
both the Equalities Act Scotland & the Fairer Scotland Duty).   
This intelligence will inform the development of an SME engagement programme.
The project will explore how supplier pathways can be enhanced, identify what
supports they need, and encourage them, to become an NHS Lanarkshire supplier.
This work will upskill targeted businesses by offering a bespoke range of supports,
including tender training, bespoke supplier events, tools, and guidance. 
This development will contribute to building relationships and sharing practice and
we will seek to do this locally through our participation as key partners in the CWB
strategy for South Lanarkshire. 
The Supplier Development Programme has significant experience in developing
engagement strategies with SMEs and will be able to support NHSL to deliver this
initiative quite quickly. Funding has been agreed and the project will run from March
2022. 
Case study 4: UWS relocation 
Following a review of their portfolio the University Court agreed that a new campus
should be found in Lanarkshire to deliver the University’s ambitions for the next
generation. UWS identified two options, one of which would have involved UWS
leaving South Lanarkshire with a loss of c£72m GVA to the local economy. The
Council worked with UWS to secure a campus within South Lanarkshire and retain
the economic benefits for the local area. Following a lengthy negotiation and
preparation of a detailed business case and economic model, UWS were persuaded
that a Hamilton based campus was the best solution for them, their students and the
local community, with the council bringing innovative approaches to funding,
procurement and delivery of the projects. 
These two anchor institutions worked in partnership in the delivery of these common
objectives both in terms of a move to a new build campus on the edge of Hamilton
and the regeneration of their existing site, including the Council’s significant land
holdings. The new campus was delivered by a local development company working
substantially with local contractors and providing significant community benefit. The
previous site is partially redeveloped for student accommodation with the remainder
going through the planning system for a residential scheme which will include a
significant proportion of social housing.  The project has delivered transformational
75

Page 76

change to the University’s provision of higher education in Lanarkshire and secured
this important economic asset for the local economy. 
76

Page 77

Workforce 
The Workforce pillar of Community Wealth Building required anchor organisations to
adopt and champion fair employment practices and work to develop a more just
labour market to improve the prospects and wellbeing of local people. 
In our strategy and action plan we set out our intention to promote fair work practices
and the living wage, leading by example and encouraging all businesses and third
sector organisations in Lanarkshire to follow suit.  We said we would use our
employability programmes and our training and recruitment activities to maximise
opportunities for local people. 
Key achievements
• The Living Wage campaign group ran a successful event in November 2021
promoting the benefits of paying the living wage, including presentations from
employers and employees. South Lanarkshire has now reached over 100
Living Wage accredited employers.
• The council’s employability projects helped identify pre-employment training
and skills required for entry level jobs as well as preparing our local residents
for interview and improve their employability.
• The Kickstart programme has provided 44 opportunities for applicants from
SIMD areas to secure work with the council and 8 to take up entry-level posts
with NHS Lanarkshire (see case study below). 
How it’s working in South Lanarkshire: 
Case study 1: East Kilbride leisure HUB 
The Council and Leisure Trust worked closely with the owners of the town centre in
East Kilbride to deliver a new leisure HUB. Although a mainly commercial venture
these three anchor institutions have brought together their assets and investment to
secure an important leisure facility for the town for the next 25 years. As part of the
town centres community benefit contribution they inserted a new and innovative
clause into all the new leases which asked the incoming tenant to engage with the
council’s employability team and to recruit locally where possible. This clause has
been extremely successful in assisting local people into jobs and on to better
outcomes. 
Case study 2: NHS Lanarkshire Kickstart South Lanarkshire 
The UK Government Kickstart Scheme provides funding for a 6-month work
placement for 16-24 year olds who are unemployed or at risk of long term
unemployment. 
Currently there are 8 young people from South Lanarkshire on placement within
NHS Lanarkshire in roles such as Healthcare Support worker, Clerical Officer and
various housekeeping positions. 
77

Page 78

Although these are entry level posts to employment with NHS Lanarkshire, support is
provided to open up the potential to establish a career in the health and social care
sector in a wide range of settings and roles requiring different levels of skills and
academic ability. 
This ties in with our vision to “effectively grow the future Health and Social Care
Workforce from our local population by encouraging more Lanarkshire residents to
choose a career from the broad spectrum of options in Health and Social Care.” 
Health improvement staff are working with the manager, team leader or appointed
buddy of the newly employed young person to offer tailored health information and
access to a range of services and supports that will improve their health and
wellbeing. 
Land and Property 
This pillar looks to deepen the function and ownership of local assets held by anchor
institutions, so that financial and social gain is harnessed by citizens. 
Our strategy highlighted the importance of affordable housing and the potential of
Community Asset Transfer as a means of giving community more control over local
places.  The strategy aimed to encourage investment and create thriving places
where people can access goods and services on foot or via public transport. 
Key achievements
• Throughout 2021/22, a total of 582 additional properties were made
available for social rent across South Lanarkshire. This included 362
new council properties, 53 purchased by the council from the open
market and 167 new homes built by Registered Social Landlord
Partners
• Through its Open Market Purchase Scheme, the council was able to
increase available stock that meets specific needs across different
areas of South Lanarkshire.
• Construction is currently underway as part of the Whitlawburn
Masterplan to deliver the final phase of development with another 60
new homes to be completed. These are being developed in partnership
with West Whitlawburn Housing Co-operative, who will take ownership
of the properties once they are complete.
• A Community Asset Transfer officer was appointed in March 2022 to
promote Community Asset Transfer to communities across South
Lanarkshire and to provide direct support to applicants.
How it’s working in South Lanarkshire: 
Case study 1: Delivering affordable homes that improve communities and
change lives 
78

Page 79

The Council’s Homes+ programme, supported by funding from the Scottish
Government’s Affordable Housing Supply Programme, continues to deliver
significant numbers of high quality, affordable homes across South Lanarkshire. 
Despite the ongoing challenges of the Covid-19 pandemic, the council have
continued to invest in communities and make good progress throughout 2021/22. 
Over the course of the last year, a total of 415 new council homes across 11 housing
developments, comprising a mix of semi-detached, terraced, bungalows, cottage
flats and low-rise flats have been delivered. The housing mix for each development
is based on the size and location of the site and takes into account assessed local
housing needs. 
The delivery of these now homes results in improved outcomes for the local
communities, providing the right type of accommodation in the right places to enable
households to live near local services and amenities. A large proportion of the new
properties delivered in 2021/22 have already been let to families with children, to
those waiting with specific medical needs and to households with registered
disabilities. In addition, a significant number of subsequent lets to homeless
households has also been achieved. 
A summary of the key developments that were completed as part of the Homes+
programme in 2021/22 has been provided below: 
Biggar
The Edinburgh Road development in Biggar was completed in February 2022. This
24-unit development comprises semi-detached family homes and bungalow
conversions which are within walking distance of all local amenities including shops,
public transport and health services. The design and materials used in the
construction are in keeping with the surrounding area. 
Carluke
In December 2021, 14 new homes were completed at the former Roadmeetings
Hospital site in Carluke, comprising semi-detached and terraced family homes as
well as cottage flats.  In additional a further 20 new homes were completed on the
site of the former Law Primary School in September 2021 including semi-
detached/terraced family homes and cottage flats. 
East Kilbride
The Jackton site in East Kilbride comprises 24 amenity flats and was completed in
March 2022.  This development was constructed by Cala Homes as part of the wider
new Community Growth Area which is offering around 2,000 private and affordable
homes in the area. 
The Shields Road development of 67 homes at Benthall Farm by Taylor Wimpey is
also progressing well and so far 28 homes, made up of cottage flats, terraced homes
and detached family homes have been completed.  Tenants started moving into
these homes in September 2021 and the remaining 39 properties are scheduled for
completion by early August 2022. 
Cambuslang
79

Page 80

The landmark housing-led regeneration of Whitlawburn has seen the completion of
160 new homes, with a further phase of new homes being constructed in partnership
with West Whitlawburn Housing Co-operative. 
In addition, the Gilbertfield Road development completed in October 2021 with 57
new homes and Auld Kirk Road completed in January 2022 with 48 homes providing
a range of accommodation options including cottage flats, terraced homes, semi-
detached bungalows and family homes. 
Hamilton/Blantyre/Larkhall
In Hamilton, the Highstonehall Road development of 48 units completed in February
2022. The St Joseph’s development in Blantyre is also now well underway with the
first tenants having moved into their terraced bungalows and terraced family homes. 
Full completion of this site is expected by June 2022. 
Drumgray Avenue, Uddingston saw the completion of 20 new homes consisting of
one and two bedroom cottage flats in December 2021.  The Glengonnar
development in Larkhall completed in March 2022 adding a further 20 new two and
three bedroom detached and semi-detached homes, and one bedroom cottage flats
to the area. 
South Lanarkshire Council are committed to increasing the provision of affordable
homes across South Lanarkshire, working with a range of services and partners to
ensure the investment continues to deliver significant improvements for households
and communities. 
Case study 2: Encouraging local food growing through Community Asset
Transfers 
Several organisations have approached the council over the past few years to take
over land with all or some of the land being set aside to grow food. Transferring
assets for food growing contributes to achieve the objectives of the Council Food
Growing Strategy and overall Good Food Strategy aiming at supporting the
development of food growing activities in the council’s area. 
For instance, the charity Grow 73 was delivering weekly community gardening
sessions in Overtoun Park in Rutherglen and wanted to expand their activities by
using the greens of the Bowling Club which were not in used.  Approaching the
council to discuss how this land could be better used made perfect sense. 
According to the co-founder and coordinator of Grow 73 “the land had been lying
vacant for over 15 years right at the heart of our local park but was fenced off from
the public, making a piece of land of just under 8000m2 inaccessible. This could add
so many benefits to our community from learning how to grow food, maybe for those
who are on a waiting list to have an allotment but wanting to gain confidence in
growing food, to upskilling or training young people with skills leading up to
employment, tackling mental health issues, and caring for the environment.” 
With this additional piece of land, Grow 73 is now developing a local community
garden so that anyone can access the opportunity to grow their own food. The
80

Page 81

Community Garden will have four areas: a social zone with a meeting space,
orchard, picnic area; a woodland zone with a kids play area; a biodiversity zone with
a wildflower garden, a sensory garden and a pond; and finally, a growing zone with
raised beds and poly-tunnel. 
The group have also carried their passion and endeavours out into the local
community and schools helping them to get their hands dirty and learn about self-
sufficiency and the benefits of outdoor pursuits. The co-founder also said “The
beneficiaries of this project would be anyone who is interested, but the connections
we have made so far are with Advinia care home, Rutherglen health centre, 18 local
schools, local groups such as community groups and scout, brownies as well as
churches and Universal connections. We are very keen to do Intergenerational work
too, which we had done for our mural at Rutherglen train station and for sculptures in
the park, celebrating local heritage”. 
Following their application, the council granted a lease of ground extending to 7,852
square meters for a period of 15 years with rental of £1 per annum. 
Case study 3: Asset Transfer for community recreational space in Blantyre 
In 2021 the charitable organisation Blantyre Soccer Academy took over an open
space at Birch Place. The objectives of the Soccer Academy are to advance public
participation in the amateur sport of football and to advance community development
by providing a safe environment to encourage and promote the development of
health, self-esteem, health and friendship within the community. 
The open space was adjacent to Blantyre Soccer Academy’s Community Hub and
the organisation was seeking to extend its community activities in partnership with
other local organisations and create a community food growing area, Covid-19
memorial area, wild growing area and outdoor recreational space. 
Following their application to the council, Blantyre Soccer Academy were able to
acquire the open space of approximately 1,943 square meters, enabling them to
progress their plans for community recreational space in Blantyre. 
81

Page 82

Finance 
The Finance pillar focuses on efforts to increase flows of investment within local
economies by harnessing and recirculating the wealth that exists, as opposed to
attracting capital. 
Our strategy aims to encourage and support financial growth for communities,
including building and attracting development and investment opportunities and
encouraging local spend. 
Key achievements
• A dedicated Investment and Marketing officer has been appointed
within the council’s Business Support Team to market the council area
and support local spend initiatives and messaging
• Established town centre App promoting local trade, community
• activities by promoting local businesses and communities. 
• ‘Scotland Loves Local’ Gift Card trial approved and in place, 1 year
pilot scheme in all SL town centres.
• Strategies to boost South Lanarkshire town centres have been
developed, covering Hamilton, Cambuslang, Larkhall and Blantyre,
under rolling 5 year review. 
How it’s working in South Lanarkshire: 
Case study 1: Cambuslang Community Council BankHUB 
During 2020-21, the Cambuslang BankHUB project piloted a new form of high-street
banking involving financial institutions cooperating to offer banking services from a
single unit. The project originated in the resilience shown by community
organisations in Cambuslang who refused to accept the loss of banking facilities in
their town, and the negative consequences for businesses and residents. Following
the successful pilot in Cambuslang, the BankHUB model is being rolled out to other
communities across the UK. 
What happens when a town becomes unbanked? This was the challenge faced by
Cambuslang in 2018 - the third largest town in South Lanarkshire, with c.28,600
people - following the closures of all three bank branches in quick succession. The
branch closures had overwhelmingly negative effects on local residents. Getting
access to cash became difficult, and the closures were a cause of substantial
financial hardship for a significant minority of residents. 
Many businesses also experienced financial difficulties and had major problems with
alternative banking facilities. Most experienced a loss of trade as local residents
shopped less on Cambuslang Main Street.  The commercial viability of the town
centre suffered, threatening to undermine a regeneration strategy for the town. 
Cambuslang Community Council took the lead in advocating the restoration of a
banking service. Its report on the consequences of branch closures made headlines
82

Page 83

in Scottish and UK media, and its submission to a House of Commons inquiry led to
the Scottish Affairs Committee launching a report on access to cash in Cambuslang. 
This evidence gathering enabled Cambuslang Community Council to apply
successfully for Cambuslang to become a Community Access to Cash Pilot (CACP)
in summer 2020. Cambuslang was one of nine pilots across the UK and one of two
in Scotland, each having the aim of testing different ways of improving access to
cash, 
A working group of local community organisations, led by the Community Council,
and a community survey of 1100 respondents showed an overwhelming demand for
face-to-face banking services in Cambuslang. Working with the CACP team and the
Post Office, the outcome of extensive discussion was the BankHUB concept. This
involved the PO and the five banks with major market share in Cambuslang
collectively – for the first time - offering services in one place. The PO would provide
a daily over-the-counter service for cash deposit/withdrawal and bill payment, while
each of the five banks would offer account management services, each providing a
community banker one day a week in turn. 
The Cambuslang BankHUB opened in April 2021 for a six-month pilot period and
was an immediate success. Very quickly it had high levels of use, with excellent
customer assessments for the quality of service.  The BankHUB has significantly
improved local access to cash; people no longer have to travel to other towns for
banking transactions. Being able to conduct banking business on the Main Street
has led people to spend more money in the town centre. Cash is being kept in the
local economy and businesses are feeling the benefit. 
The lessons from Cambuslang, and a similar pilot in Rochford, have been
recognised nationally, and the Community Access to Cash Review recommended
replicating the model elsewhere. BankHUBs are now being slowly rolled out
elsewhere, and Cambuslang Community Council is providing peer support to share
its experience of improving access to cash with other towns and communities across
the UK. 
83

Page 84

Building the generative economy 
Action under this pillar seeks to develop and grow small, locally owned enterprises
which are more financially generative for the local economy - locking wealth into
place. 
Our strategy outlined how we would work to support local businesses, not-for-profit
organisations and communities to safeguard and create local jobs and address post-
Covid recovery. 
Key achievements
• A new Small Business Support Grant has been introduced and Business
Gateway has been resourced to pilot offer of a new Start Up grant
• During the last year there have been key events to offer support to
businesses and signpost sources of help:
o Meet the Real Buyer 
o Women in Business
o Build Lanarkshire
o Lanarkshire Business Hub
• A Working Group looking at a volunteering strategy for the Community
Planning Partnership has been established led by VASLan. A survey of
partner volunteering has been completed and writing group established to
progress the strategy. 
How it’s working in South Lanarkshire: 
Case study 1: Working with communities to target town centre funding 
The Council received funding from the Scottish Government, in common with all
Local Authorities, to support our town centres to bring forward transformational
change for the communities they serve. Unlike many authorities South Lanarkshire
chose to invite bids from communities to deliver the most effective programme of
projects across our communities. 
In Carnwath we have been able to work with the local Community Council to bring
forward development on a disused site at the edge of the town centre. The
community have had aspirations to regenerate the site for a number of years and the
availability of funding and strength of their application has allowed the proposals to
proceed. The initial funding has allowed the site to be acquired and acted as a
catalyst for other funder to get behind the project. The previous owner carried out
decontamination works as part of the project and the community are now
progressing to the delivery phase of their building prioritising local contractors where
possible. Despite the challenges in the construction industry the strength of the
application has allowed the Council to provide additional funding to offset cost
increases allowing the community to deliver their ambitions. 
Following the success of this initial phase a subsequent application was supported
under the Place Based Investment Programme to support the acquisition and
84

Page 85

refurbishment of an empty retain unit in the town which the community will run on a
not for profit basis with any surplus reinvested in community events and initiatives.
The combination of these initiatives will support this small community over many
years through the delivery of CWB under most of the CWB pillars 
In Forth the community Council applied to the Council to support their ambitions to
run a community cinema and café from the hall of one of the churches located at the
centre of the town. The funding has allowed the purchase and installation of high
quality projection equipment along with the refurbishment and installation of new
kitchen equipment to bring the hall up to a suitable standard. The community have
delivered all aspects of the project and despite the challenges in the construction
industry the strength of the application has allowed the Council to provide additional
funding to offset cost increases allowing the community to deliver their ambitions. 
The community are now in the process of delivering a second phase through the
Place Based Investment Programme which will combine this facility with an outdoor
community facility at the heart of the town centre 
Bothwell community Council applied to the Council to support their ambitions to
deliver a community facility in the town library which was not being used to its full
potential. The application covered the cost of refurbishing the property which has a
number of backlog maintenance issues and acted as a catalyst to apply to other
funders to cover the cost of a community asset transfer from the council and
additional refurbishment / conversion works. The group have pulled together an
extensive and ambitious project which will see the completed project become an
important community facility which will generate income for a range of other
community projects, events and initiatives. 
Case study 2: The Hamilton Hub @ New Cross 
The Hamilton Hub @ New Cross sees the development of a £1.5 million
regeneration project which will transform 920sqm of vacant retail space into a
thriving community and enterprise hub in the heart of Hamilton town centre. The
Hamilton Hub aims to secure better outcomes for everyone and increased
opportunities for the people and communities of Hamilton to shape their own lives
securing transformational change through the provision of more and better integrated
services and opportunities for local people and enterprise. The Hamilton Hub will be
a dynamic centre for business start-ups and local enterprise and will be a focal point
for the delivery of projects, initiatives and services with an employment, skills and
health and wellbeing focus and will have a significant impact on the economic,
physical and social regeneration of Hamilton Town Centre. 
The Hamilton Hub @ New Cross, as a multi-agency centre, will ensure vital services
and organisations are accessible for local people. As well as bespoke, dedicated
office space, the hub will offer IT enabled meeting room, event and near to home
working space for the wider community. The council has used its commercial
property asset and the availability of funding from the Town Centre Capital Fund,
Place Based Investment Programme and the Regeneration Capital Grant fund
todeliver a facility which will become an important focal point for business, the
community and the third sector. 
85

Page 86

Case study 3: Lanarkshire Larder Regional Food Group 
Lanarkshire Larder is a membership organisation made up of local food and drink
businesses who want to raise awareness of the local Food and Drink industry to
residents and visitors. The group was officially formed in April 2021 with funding from
Scotland Food & Drink, North Lanarkshire Council and South Lanarkshire Council.
61 members are now part of the network including farmers, food retails and food
hospitality businesses. 
During its first year, the group focused on creating a strong food and drink identity for
Lanarkshire Larder. This has included the creation of a strong brand logo, website,
and social media presence. For instance, regular stories on producers are shared on
social media and in the newsletter. 
A food and drink trail has also been developed and promoted across Lanarkshire to
increase access to locally produced food and drink and reduce supply chain which in
turn benefits the local economy. The network has also helped to foster collaboration
as many of the members are now actively working together particularly the food retail
outlets. The group has also started to collaborate with New College Lanarkshire and
the Royal Highland Education Trust to educate pupils on agriculture and the food
and drink industry. 
Case study 4: NHS Lanarkshire Hospital Therapeutic Growing 
Clydesdale Community Initiatives (CCI) in partnership with NHS Lanarkshire have
been delivering a hospital gardening programme of work to support individuals in our
community who face barriers to inclusion. 
The project has supported hospital inpatients, outpatients, community volunteers and
NHS staff who have experienced significant levels of stress and anxiety because of
the Covid 19 pandemic.
Utilising adjustments due to the social restrictions, work continued to ensure
participants could benefit from this therapeutic growing and additional space was
identified for vegetable growing. Through the programme this past year, community
grower participation contributed to an impressive 852kg of fresh produce donations
to the Clydesdale Foodbank and delivery of 668 food parcels to local vulnerable
residents this year. 
86

Page 87

Conclusion 
This annual report has highlighted our progress over the first year of Community
Wealth Building.  We have made great strides in bringing the energies, skills and
resources of anchor organisations in South Lanarkshire to a focus around our
Community Wealth Building ambitions.   
But this is only a start.  We have been inspired by examples of what CWB can
achieve in the UK and abroad, however we recognise that these successes have
been years in the making. 
That is why our strategy looks to achieve results across a five-year period as a
starting point.  We will refresh our 5-year action plan in the light of what we have
achieved so far.  We will extend the reach and scope of our actions by working
together – partners, stakeholders and communities – to generate ideas, pool
resources and harness our collective energy to bring about lasting change.   
Our ambition, as we set out in our strategy, is to develop a resilient, inclusive local
economy, with more local employment and a more diverse business base.  As we
embark on the second year of our strategy, we will benefit from the strong foundation
we have established so far.  Over the coming year we will take co-ordinated action
across the five pillars of CWB to develop a fairer, more inclusive economy that works
for the people and businesses of South Lanarkshire. 
Further information 
To find out more, visit Community Wealth Building - South Lanarkshire Council