Democracy Spraffa

Agenda Document Pack - Clyde Valley Learning and Development Joint Committee - 14/09/2026

South Lanarkshire Council · 14 September 2026
Back to Clyde Valley Learning and Development Joint Committee — 14 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices
South Lanarkshire Council
Almada Street
Hamilton 
ML3 0AA 
Friday, 04 September 2026 
Dear Councillor 
Clyde Valley Learning and Development Joint Committee 
The Members listed below are requested to attend a meeting of the above Joint Committee
to be held as follows:- 
Date:  Monday, 14 September 2026
Time:  14:00
Venue: By Microsoft Teams, 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Jackie Taylor
Clerk to the Joint Committee 
Members  
Council Member Substitute
East Renfrewshire Andrew Anderson 
Glasgow City Anne McTaggart 
Inverclyde Francesca Brennan (Vice Convener) Jim Clocherty
North Lanarkshire Michael McBride 
South Lanarkshire Lynsey Hamilton (Convener) Gavin Keatt 
Copies to substitute members for information only
1

Page 2

BUSINESS 
1 Declaration of Interests   
2 Minutes of Previous Meeting
Minutes of the meeting of the Clyde Valley Learning and Development Joint
Committee held on 8 June 2026 submitted for approval as a correct
record.  (Copy attached) 
3 - 6 
Item(s) for Monitoring 
3 Revenue Budget Monitoring 2026/2027 - Clyde Valley Learning and
Development Joint Committee
Report dated 25 August 2026 by the Treasurer to the Clyde Valley Learning
and Development Joint Committee.  (Copy attached) 
7 - 10 
4 Clyde Valley Learning and Development Joint Committee - 2025/2026
Annual Audit Report
Letter and Annual Audit Report by Audit Scotland, External
Auditor.  (Copy attached) 
11 - 38 
Item(s) for Decision 
5 Audited Annual Accounts 2025/2026
Report dated 28 August 2026 by the Treasurer to the Clyde Valley Learning
and Development Joint Committee.  (Copy attached) 
39 - 70 
6 Clyde Valley Learning and Development Group – Governance
Considerations - Progress Report
Report dated 21 August 2026 by the Head of Personnel Services, South
Lanarkshire Council.  (Copy attached) 
71 - 84 
Urgent Business 
7 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Stuart McLeod
Clerk Telephone: 07385 370 117
Clerk Email: stuart.mcleod@southlanarkshire.gov.uk 
2

Page 3

CLYDE VALLEY LEARNING AND DEVELOPMENT JOINT COMMITTEE 
Minutes of meeting held via Microsoft Teams on 8 June 2026 
Convener:
Councillor Lynsey Hamilton, South Lanarkshire Council 
Councillors Present:
East Renfrewshire Council:  Andrew Anderson
Glasgow City Council:   Anne McTaggart
Inverclyde Council:   Councillor Francesca Brennan (Vice Convener)
North Lanarkshire Council: Michael McBride 
Attending:
Clerk’s Office
Stuart McLeod, Administration Officer; Lynne Wyllie, Administration Assistant, South Lanarkshire
Council
Treasurer’s Office
Lorraine O’Hagan, Head of Finance (Strategy), South Lanarkshire Council 
Clyde Valley Learning and Development Project
Ali Floyd, Project Manager 
Project Steering Group
Karen Gormal (Chair) 
Also Attending:
Audit Scotland
Rachel Brough-Mitchell, Senior Auditor; Pauline Murray, Senior Audit Manager
South Lanarkshire Council
Michelle Milne, Head of Personnel Services 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Clyde Valley Learning and Development Joint Committee
held on 9 February 2026 were submitted for approval as a correct record. 
The Joint Committee decided: that the minutes be approved as a correct record. 
3 Revenue Budget Monitoring 2026/2027 – Clyde Valley Learning and Development
Joint Committee 
A report dated 15 May 2026 by the Treasurer to the Clyde Valley Learning and Development
Joint Committee was submitted providing a forecast for the year to 15 May 2026.
2
3

Page 4

Since the last meeting of the Joint Committee held on 9 February 2026, Falkirk Council had
confirmed that it would not renew its membership as a participating member of the Clyde Valley
Learning and Development Project, therefore, reducing the number of member councils to 13
and total member contributions from £0.071 million to £0.067 million. 
The member contributions formed the basis for the expenditure budget for 2026/2027 which
was, therefore, also reduced.  The budget was now £0.067 million which would fund the
Management Fee to South Lanarkshire Council (£0.059 million), project work (£0.005 million)
and the External Audit fee (£0.003 million). 
In addition, an estimate of training expenditure (£0.025 million), and the recharge of this to
councils (£0.025 million), had also been added to the budget, giving a total expenditure of
£0.092 million and income budget of £0.092 million. 
As at 15 May 2026, there was a projected breakeven position against the budget, as detailed in
Appendix A to the report.   
The Joint Committee decided: 
(1) that the 2026/2027 member council contributions and resultant income and expenditure
budgets for the year be noted; and 
(2) that the breakeven position on the revenue budget, as detailed in Appendix A of the report,
be noted. 
[Reference:  Minutes of 9 February 2026 (Paragraph 4)] 
4 Clyde Valley Learning and Development Group – Governance Considerations 
A report dated 22 May 2026 by the Head of Personnel Services, South Lanarkshire Council was
submitted providing an update on the initial findings of a review of the governance arrangements
related to the Clyde Valley Learning and Development Group (CVLDG). 
As part of the review, consideration had been given to:- 
♦ the overall membership of the CVLDG
♦ the sustainability of the sub-groups, should membership continue to decline
♦ the procurement of a new Learning Management System (LMS)
♦ the time and cost of maintaining a Joint Committee structure and the formality of the
governance arrangements
♦ the benefits and breadth of the current shared services and opportunities to widen those 
The report provided details of the key issues that had been identified, including the following
issues and the resultant outcomes:- 
 Issue - explore if an alternative, more appropriate operating structure could be introduced
that would increase the efficiency for the CVLDG by reducing resource pressures of
operating a full Joint Committee structure
Outcome – it had been established that other partners, including the Improvement Service
and Scotland Excel, could be considered as an established alternative delivery model to
the current CVLDG arrangements
 Issue - increase the scope of the CVLDG to bring other activities into the shared service
format
Outcome - recommended that the Project Steering Group be reactivated to facilitate the
presentation of proposals to expand the remit of the CVLDG
4

Page 5

 Issue - explore ways to protect the operation of the CVLDG by increasing membership
and/or changing the operating structure
Outcome - the findings highlighted that only full member councils were involved in
governance.  The future direction would depend on decisions regarding the outcomes
detailed above and might require reviewing the membership model to align with new
governance arrangements and potential offerings
 Issue - assess the need for all sub-groups and protect the sub-groups by ensuring they
were structured to operate independently of the CVLDG should they be required to do so
Outcome – it had been found that all sub-groups varied in terms of productivity, however,
they could all continue to operate independently should the CVLDG change its strategic
operating structure.  It was also found that reactivating the Project Steering Group would
offer a useful way to report progress, improve oversight and support a more defined
collaborative delivery programme.  The Project Steering Group would also be able to
oversee the LMS transition that was required as the number of councils participating in the
shared LMS arrangement had reduced significantly with some member councils preferring
to pursue their own solutions to better meet local requirements 
The Head of Personnel Services responded to a member’s question in relation to the timescales
for determining more suitable governance arrangements. 
The Joint Committee decided: 
(1) that the content of the report be noted; 
(2) that, after consultation with full member councils based on the initial findings detailed in the
report, the Joint Committee would determine suitable governance arrangements; and 
(3) that the reactivation of the Project Steering Group to facilitate proposals and oversee the
Learning Management System transition be endorsed. 
5 Annual Governance Statement 2025/2026 
A report dated 5 May 2026 by the Treasurer to the Clyde Valley Learning and Development
Joint Committee was submitted on the Annual Governance Statement for 2025/2026 which
would be included in the Joint Committee’s 2025/2026 Annual Accounts. 
The Joint Committee’s Annual Governance Statement 2025/2026, which was attached at
Appendix 1 to the report, provided details of the systems for internal control which were in place
to ensure robust governance arrangements.  For 2025/2026, the Treasurer’s opinion was that
reasonable assurance could be placed on the adequacy and effectiveness of the Joint
Committee’s framework of governance, risk management and control arrangements. 
The Joint Committee decided: that the Annual Governance Statement, attached at
Appendix 1 to the report, which would be included in the
Clyde Valley Learning and Development Joint Committee’s
2025/2026 Annual Accounts, be approved. 
6 Clyde Valley Learning and Development Joint Committee – Annual Audit Plan
2025/2026 
The Joint Committee considered the Clyde Valley Learning and Development Joint Committee
Annual Audit Plan for 2025/2026, dated March 2026, submitted by the Joint Committee’s
external auditors, Audit Scotland.  The Plan set out the audit work necessary to allow Audit
Scotland to provide an independent auditor’s report and meet the audit requirements set out in
auditing standards and the Code of Audit Practice, including supplementary guidance.
5

Page 6

The Plan was structured around the following areas:- 
 introduction
 audit scope and responsibilities
 audit of the annual accounts
 wider scope and Best Value
 reporting arrangements, timetable and audit fee
 other matters, including internal audit and audit quality 
Details were given on key aspects of those areas. 
The Joint Committee decided: that the Annual Audit Plan for 2025/2026 be noted. 
7 Unaudited Annual Accounts 2025/2026 
A report dated 5 May 2026 by the Treasurer to the Clyde Valley Learning and Development
Joint Committee was submitted on the unaudited Annual Accounts for the Joint Committee for
the year ended 31 March 2026. 
The unaudited Annual Accounts, attached as Appendix 1 to the report, detailed the income and
expenditure account and balance sheet to 31 March 2026 for the Joint Committee.  The
Accounts showed that the Joint Committee’s total revenue expenditure had amounted to £0.089
million in 2025/2026 and had been met by income of £1.02 million.  This had resulted in a
£0.013 million surplus which would be transferred to reserves for use in future years.  The
balance on reserves as at 31 March 2026 was £0.077 million. 
The unaudited Annual Accounts for 2025/2026 would be passed to the external auditor for
consideration by 30 June 2026. 
The Joint Committee decided: that the unaudited Annual Accounts for the Clyde Valley
Learning and Development Joint Committee for year ended
31 March 2026 be noted. 
8 Urgent Business 
There were no items of urgent business. 
6

Page 7

Report
Agenda Item 
Report to: Clyde Valley Learning and Development Joint
Committee
Date: 14 September 2026
Report by: Treasurer to Clyde Valley Learning and Development
Joint Committee  
Subject: Revenue Budget Monitoring 2026/2027 - Clyde Valley
Learning and Development Joint Committee 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2026 to 7 August 2026 for Clyde Valley Learning and
Development Joint Committee
[1purpose]
2. Recommendation(s)
2.1. The Joint Committee is asked to approve the following recommendation(s):-
[]
(1) that the 2026/2027 member council contributions and resultant income and
expenditure budgets for the year be noted; and
(2) that the breakeven position on the Clyde Valley Learning and Development
Joint Committee revenue budget, as detailed in Appendix A of the report, be
noted.  
[1recs]
3. Background
3.1. The running costs for the Clyde Valley Learning and Development Joint Committee
are funded by contributions from the member councils.   
3.2. The previous report to the June 2026 meeting of the Joint Committee noted that 14
member councils had reduced to 13 member councils after Falkirk had decided to
withdraw from the Clyde Valley Joint Committee for 2026/2027.  There has been no
change to membership since that meeting, meaning that the member council
contributions remain at £0.067 million for 2026/2027. 
3.3. These member council contributions of £0.067 million form the basis of the
expenditure budget for 2026/2027.  This funds the Management Fee to South
Lanarkshire Council (£0.059 million), project work (£0.005 million), and the External
Audit fee (£0.003 million). 
3.4. In addition, an estimate of training expenditure (£0.025 million), and the recharge of
this to councils (£0.025 million) has also been added to the budget, giving a total
expenditure of £0.092 million and income budget of £0.092 million. 
3.5. The report details the financial position for the Clyde Valley Learning and
Development Joint Committee in Appendix A.  
3
7

Page 8

4. Employee Implications
4.1. None 
5. Financial Implications
5.1. As at 7 August 2026, there is a forecast breakeven position against the budget of
£0.092 million. 
5.2. For information, as at 7 August 2026, there is actual spend of £0.012 million under
Administration Costs relating to subscription fees and also Income received to 7
August 2026 of £0.052 million reflecting member council contributions paid to date. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Risk and Other Implications
7.1. The main risk associated with the Clyde Valley Learning and Development Joint
Committee Revenue Budget is that there is an overspend.  The risk has been
assessed as low given the detailed budget management applied within the Joint
Committee.  The risk is managed through four weekly Budget Monitoring when any
variance is analysed.  In addition, the probable outturn exercise will ensure early
warning for corrective action to be taken where appropriate. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Lorraine O’Hagan
Treasurer 
25 August 2026 
Previous References
 None 
List of Background Papers
 Financial ledger and budget monitoring results to 7 August 2026 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Graham Booth, Finance Manager (Strategy)
Ext:  2699  (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
8

Page 9

Appendix A 
CLYDE VALLEY LEARNING AND DEVELOPMENT JOINT COMMITTEE 
Revenue Budget Monitoring Report 
Period Ended 7th August 2026 (No.5) 
Annual
Budget 
Projected
Outturn 
Projected
Outturn
Variance 
Over/
Under %
Variance 
YTD
Actual 
£000 £000 £000  £000
Budget Category      
Employee Costs 0 0 0 - n/a 0
Property Costs 0 0 0 - n/a 0
Supplies & Services 5 5 0 - 0.0% 0
Transport & Plant 0 0 0 - n/a 0
Administration Costs 84 84 0 - 0.0% 12
Payments to Other Bodies 3 3 0 - 0.0% 0
Payments to Contractors 0 0 0 - n/a 0
Transfer Payments 0 0 0 - n/a 0
Financing Charges 0 0 0 - n/a 0       
Total Controllable Exp. 92 92 0
-
0.0% 0
Total Controllable Inc. (92) (92) 0
-
0.0% (52)
Net Controllable Exp. 0 0 0
-
0.0% (40)         
9

Page 10

10

Page 11

4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 
Email: info@audit.scot
www.audit.scot 
Clyde Valley Learning and Development Joint Committee
14 September 2026
Clyde Valley Learning and Development Joint Committee
Audit of the 2025/26 annual accounts
Independent Auditor’s Report
1.  My audit work on the 2025/26 annual accounts is now substantially complete. I anticipate
being able to issue unmodified audit opinions in the Independent Auditor's Report on 14
September 2026. The proposed Independent Auditor’s Report is attached at Appendix A.
Annual Audit Report
2.  Under International Standards on Auditing in the UK (ISA (UK)), I am required to report
specific matters identified from the audit of the annual accounts to those charged with
governance of Clyde Valley Learning and Development Joint Committee in sufficient time to
enable appropriate action. I present for the committee's consideration my draft Annual Audit
Report on the 2025/26 audit. The section headed "Significant findings and key audit matters"
sets out the issues identified in respect of the annual accounts, including those that I am
required to report to you. 
3.  The Annual Audit Report also sets out conclusions on the wider scope areas that frame
public audit as set out in the Code of Audit Practice.
4.  The Annual Audit Report will be issued in final form after the audit of the annual accounts has
been completed.
Uncorrected misstatements
5.  I also report to those charged with governance all uncorrected misstatements in the annual
accounts which I have identified during the course of my audit, other than those of a trivial
nature, and request that these misstatements be corrected.
6.  There are no uncorrected misstatements to report.
Other ISA (UK) matters
7.  In presenting this letter and the Annual Audit Report to the Clyde Valley Learning and
Development Joint Committee, I seek confirmation from those charged with governance on the
following matters: 
• if they are aware of any instances of actual, suspected, or alleged fraud, 
• if they are aware of any subsequent events that have occurred since the date of the
financial statements,
4
11

Page 12

• if they are content that the methods, assumptions, and data used in making accounting
estimates in the annual accounts are appropriate, 
• if all related party relationships and transactions they are aware of are reflected in the
annual accounts, and
• if they are aware of any non-compliance with laws and regulations. 
8.  Any issues that I have identified from my audit in relation to other ISA (UK) matters that I am
required to report to those charged with governance have been reported in the Annual Audit
Report. 
Representations from the Section 95 Officer
9.  As part of the completion of the audit, I am seeking written representations from the
Treasurer, who is the Section 95 Officer, on aspects of the annual accounts, including the
judgements and estimates made.
10.  A draft letter of representations is attached at Appendix B. This should be signed and
returned to me by the Treasurer with the signed annual accounts prior to the Independent
Auditor’s Report being signed. 
12

Page 13

Appendix A: Proposed Independent Auditor’s Report
Independent auditor’s report to the members of Clyde Valley Learning and
Development Joint Committee and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of Clyde Valley
Learning and Development Joint Committee for the year ended 31 March 2026 under Part VII of
the Local Government (Scotland) Act 1973. The financial statements comprise the Movement in
Reserves Statement, Comprehensive Income and Expenditure Statement, Balance Sheet,
Cash Flow Statement, and notes to the financial statements, including material accounting
policy information. The financial reporting framework that has been applied in their preparation
is applicable law and UK adopted international accounting standards, as interpreted and
adapted by the Code of Practice on Local Authority Accounting in the United Kingdom 2025/26
(the 2025/26 Code).
In my opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the Clyde Valley Learning and
Development Joint Committee as at 31 March 2026 and of its income and expenditure
for the year then ended;
• have been properly prepared in accordance with UK adopted international accounting
standards, as interpreted and adapted by the 2025/26 Code; and
• have been prepared in accordance with the requirements of the Local Government
(Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and
the Local Government in Scotland Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards on Auditing
(UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the Accounts
Commission for Scotland. My responsibilities under those standards are further described in the
auditor’s responsibilities for the audit of the financial statements section of my report. I was
appointed by the Accounts Commission on 16 March 2023. My period of appointment is five
years, covering 2022/23 to 2026/27. I am independent of the Clyde Valley Learning and
Development Joint Committee in accordance with the ethical requirements that are relevant to
my audit of the financial statements in the UK including the Financial Reporting Council’s Ethical
Standard, and I have fulfilled my other ethical responsibilities in accordance with these
requirements. Non-audit services prohibited by the Ethical Standard were not provided to the
Clyde Valley Learning and Development Joint Committee. I believe that the audit evidence I
have obtained is sufficient and appropriate to provide a basis for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the preparation of the
financial statements is appropriate.
13

Page 14

Based on the work I have performed, I have not identified any material uncertainties relating to
events or conditions that, individually or collectively, may cast significant doubt on the Clyde
Valley Learning and Development Joint Committee’s ability to continue to adopt the going
concern basis of accounting for a period of at least twelve months from when the financial
statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the Clyde Valley
Learning and Development Joint Committee’s current or future financial sustainability. However,
I report on the Clyde Valley Learning and Development Joint Committee’s arrangements for
financial sustainability in a separate Annual Audit Report available from the Audit Scotland
website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of material misstatement
that I identified and my judgements thereon.
Responsibilities of the Treasurer and Clyde Valley Learning and Development
Joint Committee for the financial statements
As explained more fully in the Statement of Responsibilities, the Treasurer is responsible for the
preparation of financial statements that give a true and fair view in accordance with the financial
reporting framework, and for such internal control as the Treasurer determines is necessary to
enable the preparation of financial statements that are free from material misstatement, whether
due to fraud or error.
In preparing the financial statements, the Treasurer is responsible for assessing the Clyde
Valley Learning and Development Joint Committee’s ability to continue as a going concern,
disclosing, as applicable, matters related to going concern and using the going concern basis of
accounting unless there is an intention to discontinue the Clyde Valley Learning and
Development Joint Committee’s operations.
The Clyde Valley Learning and Development Joint Committee is responsible for overseeing the
financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial statements as a
whole are free from material misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes my opinion. Reasonable assurance is a high level of assurance,
but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always detect a
material misstatement when it exists. Misstatements can arise from fraud or error and are
considered material if, individually or in the aggregate, they could reasonably be expected to
influence the decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I
design procedures in line with my responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• using my understanding of the local government sector to identify that the Local
Government (Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations
2014, and the Local Government in Scotland Act 2003 are significant in the context of
the Clyde Valley Learning and Development Joint Committee;
14

Page 15

• inquiring of the Treasurer as to other laws or regulations that may be expected to have
a fundamental effect on the operations of the Clyde Valley Learning and Development
Joint Committee;
• inquiring of the Treasurer concerning the Clyde Valley Learning and Development Joint
Committee’s policies and procedures regarding compliance with the applicable legal
and regulatory framework;
• discussions among my audit team on the susceptibility of the financial statements to
material misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence and
capabilities to identify or recognise non-compliance with laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the Clyde Valley
Learning and Development Joint Committee’s controls, and the nature, timing and extent of the
audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that
result from error as fraud may involve collusion, intentional omissions, misrepresentations, or
the override of internal control. The capability of the audit to detect fraud and other irregularities
depends on factors such as the skilfulness of the perpetrator, the frequency and extent of
manipulation, the degree of collusion involved, the relative size of individual amounts
manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is
located on the Financial Reporting Council's website www.frc.org.uk/auditorsresponsibilities.
This description forms part of my auditor’s report.
Reporting on other requirements
Other information 
The Treasurer is responsible for the other information in the annual accounts. The other
information comprises the Management Commentary, Annual Governance Statement and
Statement of Responsibilities. 
My responsibility is to read all the other information and, in doing so, consider whether the other
information is materially inconsistent with the financial statements or my knowledge obtained in
the course of the audit or otherwise appears to be materially misstated. If I identify such material
inconsistencies or apparent material misstatements, I am required to determine whether this
gives rise to a material misstatement in the financial statements themselves. If, based on the
work I have performed, I conclude that there is a material misstatement of this other information,
I am required to report that fact. I have nothing to report in this regard.
My opinion on the financial statements does not cover the other information and I do not
express any form of assurance conclusion thereon except on the Management Commentary
and Annual Governance Statement to the extent explicitly stated in the following opinions
prescribed by the Accounts Commission.
15

Page 16

Opinions prescribed by the Accounts Commission on the Management Commentary and
Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial year for which
the financial statements are prepared is consistent with the financial statements and
that report has been prepared in accordance with statutory guidance issued under the
Local Government in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the financial year for
which the financial statements are prepared is consistent with the financial statements
and that report has been prepared in accordance with the Delivering Good Governance
in Local Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my audit. 
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the wider scope
responsibilities specified in the Code of Audit Practice, including those in respect of Best Value,
are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of
the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 108 of the Code of Audit Practice, I do not undertake to have responsibilities to
members or officers, in their individual capacities, or to third parties. 
Pauline Murray CPFA
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN 
16

Page 17

Appendix B: Letter of Representations (ISA (UK) 580) 
Pauline Murray
Audit Scotland 
4th Floor
102 West Port
Edinburgh
EH3 9DN 
Clyde Valley Learning and Development Joint Committee
Annual accounts 2025/26
Dear Pauline
This representation letter is provided in connection with your audit of the annual accounts of
Clyde Valley Learning and Development Joint Committee, hereafter referred to as the Joint
Committee, for the year ended 31 March 2026 for the purpose of expressing an opinion as to
whether the financial statements give a true and fair view and have been properly prepared, and
for expressing other opinions on the Management Commentary and Annual Governance
Statement.
I confirm to the best of my knowledge and belief, and having made such enquiries as I
considered necessary, the following representations given to you in connection with your audit
of the Joint Committee’s annual accounts for the year ended 31 March 2026.
General
I have fulfilled my responsibilities for the preparation of the 2025/26 annual accounts as set out
in your 2025/26 Annual Audit Plan. All the accounting records, documentation, and other
matters which I am aware are relevant to the preparation of the annual accounts have been
made available to you for the purposes of your audit. All transactions undertaken by the Joint
Committee have been recorded in the accounting records and are properly reflected in the
financial statements. 
As you have reported, there are no uncorrected misstatements.
Financial Reporting Framework
The annual accounts have been prepared in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2025/26 (2025/26 Code), and the requirements of
the Local Government (Scotland) Act 1973, the Local Government in Scotland Act 2003, and
the Local Authority Accounts (Scotland) Regulations 2014. 
In accordance with the Local Authority Accounts (Scotland) Regulations 2014, I have ensured
that the financial statements give a true and fair view of the financial position of the Joint
Committee at 31 March 2026 and the transactions for 2025/26.
17

Page 18

Accounting Policies and Estimates
All material accounting policies applied are as shown in the note included in the financial
statements. The accounting policies are determined by the 2025/26 Code, where applicable.
Where the 2025/26 Code does not specifically apply, I have used judgement in developing and
applying an accounting policy that results in information that is relevant and reliable. All
accounting policies applied are appropriate to the Joint Committee’s circumstances and have
been consistently applied.
The methodology, significant assumptions, and data used in making accounting estimates are
reasonable, and have been properly reflected and disclosed in the financial statements in
accordance with the 2025/26 Code. Judgements made in making estimates have been based
on the latest available and reliable information. Estimates have been revised where there are
changes in the circumstances on which the original estimate was based or as a result of new
information or experience.
Going Concern Basis of Accounting
I have assessed the Joint Committee’s ability to continue to use the going concern basis of
accounting and have concluded that it is appropriate. I am not aware of any material
uncertainties that may cast significant doubt on the Joint Committee’s ability to continue to
adopt the going concern basis of accounting.
No formal decision has been taken by the constituent authorities to wind up, dissolve or
otherwise terminate the Joint Committee within the period of our going concern assessment. 
Assets
The Joint Committee does not own or lease any assets. 
Liabilities 
All liabilities at 31 March 2026 of which I am aware have been reported in the financial
statements. 
Contingent Liabilities
There are no significant contingent liabilities arising either under formal agreement or through
formal undertakings requiring disclosure in the financial statements.
Litigation and Claims
There are no known actual or possible legal claims requiring disclosure in the accounts.
Fraud
I understand my responsibilities for the design, implementation, and maintenance of internal
control to prevent fraud and I believe I have appropriately fulfilled those responsibilities.
I have provided you with all information in relation to:
• my assessment of the risk that the financial statements may be materially misstated as a
result of fraud,
• any allegations of fraud or suspected fraud affecting the financial statements, and 
18

Page 19

• fraud or suspected fraud that I am aware of involving management, employees who have
a significant role in internal control, or others that could have a material effect on the
financial statements.
Laws and Regulations
I have disclosed to you all known instances of non-compliance or suspected non-compliance
with laws and regulations whose effects should be considered when preparing financial
statements.
Related Party Transactions
All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with IAS 24, as adopted by the 2025/26
Code. I have made available to you the identity of all of the Joint Committee’s related parties
and all the related party transactions of which I am aware.
Management Commentary
I confirm that the Management Commentary has been prepared in accordance with statutory
guidance, and the information is consistent with the financial statements. 
Corporate Governance
I confirm the Joint Committee has undertaken a review of the system of internal control during
2025/26 to establish the extent to which it complies with proper practices set out in Delivering
Good Governance in Local Government: Framework 2016. I have disclosed to you all
deficiencies in internal control identified from this review or of which I am otherwise aware.
I confirm that the Annual Governance Statement has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework 2016 and the information is
consistent with the financial statements. There have been no changes in the corporate
governance arrangements, or issues identified, since 31 March 2026 which require to be
reflected in the Annual Governance Statement or annual accounts.
Events Subsequent to the Date of the Balance Sheet
All events subsequent to 31 March 2026 for which IAS 10, as adopted by the 2025/26 Code,
requires adjustment or disclosure have been adjusted or disclosed. 
Yours sincerely 
Lorraine O’Hagan
Treasurer to the Clyde Valley Learning and Development Joint Committee 
19

Page 20

20

Page 21

Clyde Valley Learning
and Development
Joint Committee
2025/26 Annual Audit Report - DRAFT 
Prepared for Clyde Valley Learning and Development Joint Committee and the Controller
of Audit
September 2026
4
21

Page 22

Clyde Valley Learning and Development Joint Committee: 2025/26 Annual Audit Report -
DRAFT | 2 
Contents 
Summary of audit opinions and conclusions 3
Introduction 4
Audit scope, responsibilities, and fee 5
Audit of the annual accounts 7
Financial Sustainability and Best Value audit 12
Appendix 1 16 
Accessibility
You can find out more and read this report using assistive technology on
our website www.audit.scot/accessibility.
22

Page 23

Summary of audit opinions and conclusions | 3 
Summary of audit opinions and
conclusions 
Audit of the annual accounts
1 All audit opinions stated that the annual accounts were free from material
misstatement. 
2 There were no significant findings or key audit matters to report. One
immaterial misstatement was corrected in the accounts, but this had no
impact on the core financial statements due to rounding. 
Financial Sustainability and Best Value audit
3 Clyde Valley Learning and Development Joint Committee has effective and
appropriate arrangements in place for securing financial sustainability.
4 Clyde Valley Learning and Development Joint Committee has effective and
appropriate arrangements in place for securing Best Value. 
23

Page 24

Introduction | 4 
Introduction 
Purpose of the Annual Audit Report
1.  The purpose of this Annual Audit Report is to report the significant
matters identified from the 2025/26 audit of Clyde Valley Learning and
Development Joint Committee’s annual accounts and the wider scope
areas specified in the Code of Audit Practice (2021).
2.  The Annual Audit Report is addressed to Clyde Valley Learning and
Development Joint Committee, hereafter referred to as ‘the Joint
Committee’ and the Controller of Audit, and will be published on Audit
Scotland’s website in due course. 
Appointed auditor and independence
3.  Pauline Murray, of Audit Scotland, has been appointed as external
auditor of the body for the period from 2022/23 until 2026/27. As reported
in the Annual Audit Plan, Pauline Murray, as engagement lead, and the
audit team are independent of the body in accordance with relevant ethical
requirements, including the Financial Reporting Council’s Ethical
Standard. There have been no developments since the issue of the Annual
Audit Plan that impact on the continued independence of the engagement
lead or the rest of the audit team from the body, including no provision of
non-audit services. 
Acknowledgements
4.  We would like to thank the Joint Committee and its staff, particularly
those involved in preparation of the annual accounts, for their cooperation
and assistance during the audit. We look forward to working together
constructively over the remainder of the five-year audit appointment.
24

Page 25

Audit scope, responsibilities, and fee | 5 
Audit scope, responsibilities, and
fee 
Scope of the audit 
5.  The audit is performed in accordance with the Code of Audit Practice,
including supplementary guidance, International Standards on Auditing
(ISA) (UK), and relevant legislation. These set out the requirements for the
scope of the audit which includes: 
• An audit of the financial statements and an opinion on whether they
give a true and fair view and are free from material misstatement. 
• An opinion on statutory other information published with the
financial statements in the annual accounts, namely the
Management Commentary and Annual Governance Statement. 
• Concluding on the financial sustainability of the Joint Committee
and a review of the Annual Governance Statement. 
• Reporting on the Joint Committee’s arrangements for securing Best
Value.
• Provision of this Annual Audit Report.
Responsibilities and reporting
6.  The Code of Audit Practice sets out the respective responsibilities of the
body and the auditor. A summary of the key responsibilities is outlined
below. 
Auditor’s responsibilities
7.  The responsibilities of auditors in the public sector are established in
the Local Government (Scotland) Act 1973. These include providing an
independent opinion on the financial statements and other information
reported within the annual accounts, and concluding on the Joint
Committee’s arrangements in place for the wider scope areas and Best
Value.
8.   The matters reported in the Annual Audit Report are only those that
have been identified by the audit team during normal audit work and may
not be all that exist. Communicating these does not absolve the body from
its responsibilities outlined below. 
25

Page 26

Audit scope, responsibilities, and fee | 6 
The Joint Committee’s responsibilities
9.  The Joint Committee has primary responsibility for ensuring proper
financial stewardship of public funds, compliance with relevant legislation
and establishing effective arrangements for governance, propriety, and
regularity that enables it to successfully deliver its objectives. The features
of proper financial stewardship include: 
• Establishing arrangements to ensure the proper conduct of
its affairs. 
• Preparation of annual accounts, comprising financial statements
that give a true and fair view and other specified information.  
• Establishing arrangements for the prevention and detection of
fraud, error and irregularities, and bribery and corruption. 
• Implementing arrangements to ensure its financial position is
soundly based. 
• Making arrangements to secure Best Value. 
• Establishing an internal audit function.
Audit Fee
10.  The audit fee for the 2025/26 audit was reported in the Annual Audit
Plan and was set at £2,570. There have been no developments that
impact on planned audit work required, therefore the audit fee reported in
the Annual Audit Plan remains unchanged. 
National and performance audit reporting
11.  The Auditor General for Scotland and the Accounts Commission
regularly publish national and performance audit reports. These cover a
range of matters, many of which may be of interest to the Joint Committee.
Details of national and performance audit reports published over the last
year can be seen in Appendix 1.
26

Page 27

Audit of the annual accounts | 7 
Audit of the annual accounts 
Main judgements
All audit opinions stated that the annual accounts were free from
material misstatement. 
There were no significant findings or key audit matters to report. One
immaterial misstatement was corrected in the accounts.
Audit opinions on the annual accounts
12.  The Joint Committee’s annual accounts were approved by the Joint
Committee on 14 September 2026 and certified by the appointed auditor
on 14 September 2026. The Independent Auditor’s Report is included in
the Joint Committee’s annual accounts, and this reports that, in the
appointed auditor’s opinion, these were free from material misstatement. 
Audit timetable 
13.  The unaudited annual accounts and all working papers were received
in accordance with the agreed audit timetable. 
Materiality
14.  The concept of materiality is applied by auditors in planning and
performing an audit, and in evaluating the effect of any uncorrected
misstatements on the financial statements or other information reported in
the annual accounts.
15.  Broadly, the concept of materiality is to determine whether
misstatements identified during the audit could reasonably be expected to
influence the decisions of users of the annual report and accounts.
Auditors set a monetary threshold when determining materiality, although
some issues may be considered material by their nature. Therefore,
materiality is ultimately a matter of the auditor’s professional judgement.
16.  Materiality levels for the body were determined at the risk assessment
phase of the audit and were reported in the Annual Audit Plan, which also
reported the judgements made in determining materiality levels. These
were reassessed on receipt of the unaudited annual accounts. Materiality
levels were updated and these can be seen in Exhibit 1.
27

Page 28

Audit of the annual accounts | 8 
Exhibit 1
2025/26 Materiality levels for Clyde Valley Learning and Development Joint Committee 
Materiality Amount
Materiality – set at 2% of gross expenditure £1,700
Performance materiality – set at 75% of materiality. As outlined in the
Annual Audit Plan, this acts as a trigger point. If the aggregate of
misstatements identified during the audit exceeds performance
materiality, this could indicate further audit procedures are required.
£1,275
Reporting threshold – set at 5% of materiality.  £85
Source: Audit Scotland
Significant findings and key audit matters 
17.  ISA (UK) requires auditors to communicate significant findings from
the audit to those charged with governance, which is the Joint Committee.
18.  The Code of Audit Practice also requires public sector auditors to
communicate key audit matters. These are the matters that, in the
auditor’s professional judgement, are of most significance to the audit of
the financial statements and require most attention when performing
the audit. 
19.  In determining key audit matters, auditors consider:
• Areas of higher or significant risk of material misstatement. 
• Areas where significant judgement is required, including accounting
estimates that are subject to a high degree of estimation
uncertainty. 
• Significant events or transactions that occurred during the year.
20.  There are no significant findings or key audit matters to report. 
21.  One other matter was identified in respect of related parties. The
maintenance of up to date registers of interest is a key control in
assessing potential related party relationships and transactions. Our audit
work identified that registers of interest were available for all Committee
members, but were not maintained for senior management of the Joint
Committee. This was subsequently compiled by management, and no
issues were identified. 
28

Page 29

Audit of the annual accounts | 9 
Qualitative aspects of accounting practices 
22.  ISA (UK) 260 also requires auditors to communicate their view about
qualitative aspects of the body’s accounting practices, including
accounting policies, accounting estimates, and disclosures in the financial
statements.
Accounting policies 
23.  The appropriateness of accounting policies adopted by the body was
assessed as part of the audit. These were considered to be appropriate to
the circumstances of the Joint Committee, and there were no significant
departures from the accounting policies set out in the Code of Practice on
Local Authority Accounting in the United Kingdom (the Code).
Disclosures in the financial statements
24.  The adequacy of disclosures in the financial statements was assessed
as part of the audit. The quality of disclosures was adequate.
Significant matters discussed with management
25.  All matters identified during the audit and discussed with the Joint
Committee’s management have been reported in the Annual Audit Report. 
Audit adjustments
26.  Audit adjustments were required to the financial statements to correct
misstatements that were identified from the audit. Details of all audit
adjustments greater than the reporting threshold of £85 are outlined in
Exhibit 2. 
27.  One immaterial misstatement was corrected in the accounts, but this
had no impact on the core financial statements due to rounding. A number
of other adjustments were corrected related to disclosures which had no
impact on the core financial statements.
Exhibit 2
Audit adjustments 
Details
Financial
statements lines
impacted
Comprehensive
Income and
Expenditure
Statement (CIES) Balance Sheet
Audit adjustments to financial
statements Dr Cr Dr Cr 
£ £ £ £
29

Page 30

Audit of the annual accounts | 10 
Details
Financial
statements lines
impacted
Comprehensive
Income and
Expenditure
Statement (CIES) Balance Sheet
1. Income from interest earned on
revenue balances     
Income  316   
Short-term
investments    316 
Net impact on financial statements  316 316 
Audit adjustments in disclosures    
1. Rounding differences on the face of the balance sheet of £1k each to short-term
investments and creditors were made. These adjustments also resulted in £1k amendments
to figures in disclosed across Note 2 and Note 3 of the accounts.
2. A related party creditor balance of £77k with South Lanarkshire Council was incorrectly
disclosed in Note 4 of the accounts. This misstatement was material but disclosure only, and
has been corrected by management. A similar misstatement was identified in the 24/25
comparative figures disclosed, where a creditor balance of £64k with South Lanarkshire
Council was incorrectly disclosed. As a material misstatement, this resulted in a prior year
restatement of this disclosure. These adjustments did not have any impact on the core
financial statements.
3. Related party receipts were incorrectly disclosed in Note 4 of the accounts. The total
misstatement was an understatement of £36k of related party receipts across all 5 member
councils disclosed in Note 4. This misstatement was material, and the disclosure has been
corrected by management. This adjustment did not have any impact on the core financial
statements.
4. Updates were made to Note 4 Related Parties to recognise the Scottish Government as a
related party of the Joint Committee.
Source: Audit Scotland
Significant risks of material misstatement identified in the
Annual Audit Plan
28.  Audit work has been performed in response to the significant risk of
material misstatement identified in the Annual Audit Plan. The outcome of
audit work performed is summarised in Exhibit 3. 
30

Page 31

Audit of the annual accounts | 11 
Exhibit 3
Significant risks of material misstatement to the financial statements 
Risk of material
misstatement Planned audit response Outcome of audit work
Fraud caused by
management override of
controls 
Management is in a unique
position to perpetrate fraud
because of management’s
ability to override controls
that otherwise appear to be
operating effectively.
The audit team will:
• Evaluate the design and
implementation of controls
over journal entry
processing.
• Make inquiries of
individuals involved in the
financial reporting process
about inappropriate or
unusual activity relating to
the processing of journal
entries.
• Test journals entries,
focusing on those that are
assessed as higher risk.
• Evaluate significant
transactions outside the
normal course of business.
• Assess the adequacy of
controls in place for
identifying and disclosing
related party relationships
and transactions in the
financial statements. 
Audit work performed found:
• The design and
implementation of controls
over journal processing
were appropriate. 
• No inappropriate or
unusual activity relating to
the processing of journal
entries was identified from
discussions with
individuals involved in
financial reporting. 
• No significant issues were
identified from testing of
journal entries. 
• No significant issues were
identified from transactions
outside the normal course
of business. 
• The controls in place for
identifying and disclosing
related party relationships
and transactions were
adequate. 
Conclusion: no evidence of
fraud caused by
management override of
controls. 
Source: Audit Scotland
Prior year recommendations 
29.  There were no recommendations made in our 2024/25 annual audit
report for follow up.
31

Page 32

Financial Sustainability and Best Value audit | 12 
Financial Sustainability and
Best Value audit 
Conclusion
The Joint Committee has effective and appropriate arrangements in
place for securing financial sustainability. 
The body has effective and appropriate arrangements in place for
securing Best Value. 
Audit approach to wider scope and Best Value
Wider scope
30.  The Annual Audit Plan reported the Joint Committee was considered
to be a less complex body for the wider scope audit. Therefore, the wider
scope audit does not cover all four wider scope areas and is instead
limited to concluding on the financial sustainability of the Joint Committee. 
Best Value
31.  Under the Code of Audit Practice, the duty on auditors to consider the
arrangements an audited body has in place to secure Best Value applies
to audited bodies that fall within section 106 of the Local Government
(Scotland) Act 1973, which the Joint Committee does.
32.  Consideration of the arrangements the Joint Committee has in place to
secure Best Value have been carried out alongside the wider scope audit. 
Conclusions on Financial Sustainability
33.  The audit work performed on the arrangements the Joint Committee
has in place for securing financial sustainability found that these were
effective and appropriate. 
The Joint Committee reported a surplus of £13,000 in 2025/26
34.  The Joint Committee secured contributions totalling £71,000 from the
member authorities towards its running costs for 2025/26. As the
administering authority, South Lanarkshire Council manages the Joint
Committee’s running costs within the allocated budget.
32

Page 33

Financial Sustainability and Best Value audit | 13 
35.  Income and expenditure for the year are reported as £102,000 and
£89,000 respectively, resulting in a £13,000 surplus on the provision of
services. The surplus has been added to the accumulated reserves
balance brought forward from 2024/25. As at 31 March 2026, the Joint
Committee’s general fund reserve is £77,000. 
Current funding arrangements provide a sustainable financial
position for the Joint Committee
36.  The Joint Committee’s sustainability is dependent on participating
councils’ continued support. The Joint Committee has secured
contributions totalling £67,000 from 13 member councils, five being full
members, towards the running costs of the project for 2026/27. This is a
reduction of £4,000 from 2025/26 after one council did not renew its
participating membership. 
37.  However, this funding still exceeds the Joint Committee’s agreed
minimum level of funding required to maintain the viability of the project
(being a commitment from at least five full member councils and
contributions of £59,000 in total from all members). 
38.  At the Joint Committee meeting in June 2026, the 2026/27 revenue
budget monitoring report noted that in addition to the member
contributions of £67,000, there is budgeted training expenditure of
£25,000, with this recharged to councils. This gives a total expenditure and
income budget of £92,000 for 2026/27. 
39.  In February 2026, the 2026/27 Membership and Funding paper was
presented to the Joint Committee. Whilst the paper did not include a
formal statement on reserves, it did assess the adequacy of the funding
for 2026/27. The Joint Committee agreed that any unspent element of this
funding would be transferred to reserves for use in future years. This
reserve balance will be reviewed annually as part of the membership and
funding contributions review. 
The Joint Committee is considering options for its future
governance arrangements
40.  After the withdrawal of one council from full membership in 2022/23,
the Joint Committee membership was reduced to the minimum level for
the continuation of the project. This presents a risk to the ongoing viability
of the Joint Committee if any current full member were to withdraw in the
future. 
41.  For 2027/28, membership is projected to reduce by a further two
participating members to 11 councils, of which five will be full members,
generating income of £61,000. With membership continuing to decline,
this still remains above the £59,000 minimum funding requirement. 
42.  In June 2026, a Governance Considerations paper was presented to
the Joint Committee. This paper outlined key issues in respect of the
33

Page 34

Financial Sustainability and Best Value audit | 14 
membership of the Joint Committee (being at its minimum level), the time
and cost involved in maintaining a formal Joint Committee structure, and
the existence of other partner agencies who now offer similar shared
service delivery models to that which the Joint Committee aims to achieve. 
43.  The Governance Considerations paper set out four potential outcomes
for the future of the Joint Committee. This included exploring alternative
operating structures that are less onerous than a formal Joint Committee,
increasing the scope of activities of the Clyde Valley Learning and
Development Group, increasing membership and conducting an
assessment of all sub-groups. An update is expected to be reported to the
Joint Committee meeting in September 2026 and we will consider any
developments in our ongoing audit work in 2026/27.
Conclusion on Best Value
44.  The audit work performed on the arrangements the body has in place
for securing Best Value found these were effective and appropriate. This
judgement is evidenced by:
• the Joint Committee having well established and effective
governance arrangements in place, with the Best Value being a key
aspect of the governance arrangements. 
• the arrangements the body has in place to secure financial
sustainability which help ensure the effective use of available
resources. 
45.  The Joint Committee has overall responsibility for overseeing the
Project. The overall objective of the Project is to establish and deliver
multiple shared approaches to training, learning and development
between the Clyde Valley Councils (South Lanarkshire, North Lanarkshire,
Glasgow City, East Renfrewshire and Inverclyde Councils) which will result
in:
• greater efficiency due to shared working rather than a council-by-
council approach
• reduced duplication of effort
• the identification, development and sharing of best practice
• setting, achieving and maintaining the highest standards of service
delivery
• modernising service delivery by improving practice and making best
use of information technology
• a consistent approach to training, learning and development
34

Page 35

Financial Sustainability and Best Value audit | 15 
• ensuring equality of opportunity for all Clyde Valley employees in
accessing appropriate learning and development
• developing centres of excellence from which to deliver models
suitable for replication nationally. 
46.  The Joint Committee has recognised the availability of other partner
agencies offering similar shared service delivery models. While the Joint
Committee remains committed to achieving best value, governance
considerations are under review to ensure the most efficient and effective
structure is used going forward. 
35

Page 36

Appendix 1 | 16 
Appendix 1
Supporting national and performance audit reports 
Report name Date published
Local government budgets 2025/26 22 May 2025
NHS in Scotland: Spotlight on governance 28 May 2025
Delivering for the future: Responding to the workforce challenge  7 August 2025
Flooding in communities: Moving towards flood resilience  28 August 2025
Adult Disability Payment  18 September 2025
Scotland’s colleges 2025 2 October 2025
Improving care experience: Delivering The Promise 8 October 2025
Local government performance: Spotlight on culture and leisure
services
23 October 2025
Financial sustainability and taxes  13 November 2025
NHS in Scotland 2025: Finance and performance 4 December 2025
Delayed discharges: A symptom of the challenges facing health
and social care
8 January 2026
Community health and social care: Performance 2025 8 January 2026
Administration of Scottish income tax 2024/25 16 January 2026
Local Government in Scotland: Financial bulletin 2024/25 29 January 2026
The Scottish Budget 2026/24: Supplement to the Financial bulletin
2024/25
12 February 2026
Integration Joint Boards: Finance bulletin 2024/25 26 February 2026
Annual Assurance and Risks Report: A review of 2024/25 local
government audits in Scotland
12 March 2026
36

Page 37

Clyde Valley Learning and
Development Joint Committee 
2025/26 Annual Audit Report - DRAFT 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot 
AS.5.0
37

Page 38

38

Page 39

Report
Agenda Item 
Report to: Clyde Valley Learning and Development Joint
Committee
Approval requested
by: 14 September 2026
Report by: Treasurer to Clyde Valley Learning and Development
Joint Committee  
Subject: Audited Annual Accounts 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
♦ advise members of the outcome of the audit by the Joint Committee’s external
auditor, Audit Scotland
♦ advise members of the requirement to approve the Annual Accounts for
2025/2026 for signature
[1purpose]
2. Recommendation(s)
2.1. The Joint Committee is asked to approve the following recommendation(s):-
♦ [recs]
(1) that it be noted that the Annual Accounts for 2025/2026 received a clean audit
certificate (section 4.2); and
(2) that the audited Annual Accounts for 2025/2026, be approved for signature
(Appendix 1).
o [1recs]
3. Background
3.1. The auditor, Audit Scotland, is required to supply an audit certificate outlining the
findings of the audit process undertaken in relation to the Annual Accounts 2025/2026. 
3.2. Following the publication of The Local Authority Accounts (Scotland) Regulations 2014
and the Local Authority (Capital Finance and Accounting) (Scotland)(Coronavirus)
Amendment Regulations 2022, the members of the Board are required to meet to
consider whether to approve the audited Annual Accounts for signature.  The
members are also required to have regard to any report made or advice provided on
the Annual Accounts by the auditor. 
4. Audited Accounts
4.1. As noted in 3.2 above, members are required to approve the audited Annual Accounts
for signature.  Appendix 1 attached provides a copy of the Annual Accounts for
members’ consideration.  There were no significant changes to the financial position
reported in June 2026, and only some minor presentational changes within the
Balance Sheet and Notes to the Accounts.  
5
39

Page 40

4.2. The Joint Committee’s external auditors, Audit Scotland, have completed an audit
which extends across the 2025/2026 Annual Accounts and related matters.  In
summary, the report provides a clean audit certificate with no audit actions identified. 
A full copy of the report has been provided to members at this meeting. 
4.3. Copies of the audited Annual Accounts are attached at Appendix 1 to this report and
will be available on South Lanarkshire Council’s website. 
5. Employee Implications
5.1. None 
6. Financial Implications
6.1. The Accounts show that the Joint Committee’s total revenue expenditure amounted to
£0.089 million in 2025/2026 and was met by income of £0.102 million.  This resulted
in a £0.013 million surplus.  The majority of this surplus is because no expenditure
was required in terms of supplies and services, which had a budget of £0.010 million. 
6.2. After taking account of any accruals and commitments, this leaves a revenue cash
balance of £0.077 million to be carried forward for use in future years. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
8. Risk and Other Implications
8.1. The main risk associated with the Clyde Valley Learning and Development Joint
Committee Revenue Budget is failure to manage the budget resulting in expenditure
exceeding available funding.  The risk has been assessed as low given the detailed
budget management applied within the Joint Committee.  The risk is managed through
four weekly Budget Monitoring when any variance is analysed.  In addition, the
probable outturn exercise ensured early warning for corrective action to be taken
where appropriate. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact assessment
is required. 
9.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Lorraine O’Hagan
Treasurer to Clyde Valley Learning and Development Joint Committee 
28 August 2026 
Previous References
 None  
40

Page 41

List of Background Papers
♦ Clyde Valley Learning and Development Joint Committee Annual Accounts 2025/2026
and External Auditor’s report 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Graham Booth, Finance Manager (Strategy)
Ext:  2699  (Tel:  01698 452699)
E-mail:   graham.booth@southlanarkshrire.gov.uk   
41

Page 42

42

Page 43

1 
CLYDE VALLEY LEARNING AND DEVELOPMENT
JOINT COMMITTEE 
AUDITED ANNUAL ACCOUNTS
2025/2026 
5
43

Page 44

2 
CLYDE VALLEY LEARNING AND DEVELOPMENT
JOINT COMMITTEE 
ANNUAL ACCOUNTS 2025/2026 
CONTENTS 
3 Introduction by the Convener of Clyde Valley Learning and
Development Joint Committee 
4-8 Management Commentary 
9-11 Annual Governance Statement 
12 Movement in Reserves Statement 
13 Comprehensive Income and Expenditure Statement  
14 Balance Sheet 
15 Cash Flow Statement 
16-18 Notes to the Financial Statements 
19-20 Statement of Accounting Policies 
21-22 Statement of Responsibilities for the Annual Accounts 
23-26 Independent Auditor’s Report 
27 Glossary of Terms
28 Clyde Valley Learning and Development Joint Committee Members
44

Page 45

3 
Introduction by the Convener of Clyde Valley Learning and Development Joint
Committee 
It sometimes seems that the one constant in local government is change. In a climate where
we constantly face new challenges, it is more important than ever that we rely on our
networks and collaborations. The Clyde Valley Learning and Development Group remains
an exceptionally successful example of this collegiate spirit.
For a project originally envisaged to last for five years it is astonishing to reflect that last year
was the eighteenth year of the Project’s existence. As the membership structure established
six years ago continues to demonstrate the continued support of our Member Councils, a
healthy number of councils continue to retain membership as Full or Participating Members.
I remain confident that the exceptional networks established through the Project will continue
to provide opportunities for mutual support and shared delivery of learning and development.
To all the Elected Members on the Clyde Valley Learning and Development Joint Committee
I would like to extend my thanks and appreciation for your continued support. Similarly, I
would like to recognise the hard work and commitment of the officers who consistently
deliver the Project’s outputs and benefits year after year. 
In the face of the challenges facing our communities and our councils, I believe we can
continue to look forward optimistically to the coming year for the Clyde Valley Learning and
Development Group and would like to take the opportunity to encourage all Joint Committee
Members, and the officers from the Member Councils to continue to take an active role in
ensuring the continued success of the Project. 
Councillor Lynsey Hamilton
Convener
Clyde Valley Learning and Development Joint Committee 
45

Page 46

4 
Management Commentary 2025/2026 
Introduction 
The Management Commentary of the Clyde Valley Learning and Development Joint
Committee provides details of the environment in which the Joint Committee operates and
on the Joint Committee’s performance, both operationally and financially. 
The following commentary relates to the 2025/2026 financial year. 
Objectives
The overall objective of the project remains to establish and deliver multiple shared
approaches to training, learning and development between the Clyde Valley Councils (South
Lanarkshire, North Lanarkshire, Glasgow City, East Renfrewshire, and Inverclyde Councils)
which will result in: 
 Greater efficiency due to shared working rather than a Council-by-Council approach, 
 Reduced duplication of effort
 The identification, development and sharing of best practice,
 Setting, achieving and maintaining the highest standards of service delivery,
 Modernising service delivery by improving practice and making best use of infor-
mation technology,
 A consistent approach to training, learning and development,
 Ensuring equality of opportunity for all Clyde Valley employees in accessing appropri-
ate learning and development, 
 Developing centres of excellence from which to deliver models suitable for replication
nationally. 
Financial Statements 
The purpose of the financial statements is to demonstrate stewardship of the public monies
which fund the work of the Committee. 
The financial statements have been prepared in accordance with the CIPFA/LASAAC Code
of Practice on Local Authority Accounting in the United Kingdom 2025-2026, supported by
International Financial Reporting Standards (IFRS) which ensures a set of statements is
produced, each statement with a single clear objective. 
The cumulative underspend at the end of the year will be held by the Committee for
utilisation in future years.  These monies are reflected as a General Fund Reserve on the
Balance Sheet.   
Performance Review 
The Clyde Valley Councils continue to monitor the benefits and outcomes they achieve
through their involvement in the project on an ongoing basis. As the project’s stability is
maintained and the achievements are considered each year, the collaborative approach to
learning and development continues to demonstrate added value to the member councils.
46

Page 47

5 
In the financial year 2025/2026, benefits have been realised through making cost savings as
well as developing and implementing best practice in the following areas: 
 Ongoing contracts achieved through joint procurement
 E-Learning development, improvements and content sharing
 Individual Councils demonstrating new skills and techniques and sharing these with
the wider Clyde Valley Group
 Producing a professional publication to support a common approach to managing
mandatory training for all councils 
 Delivering a paper which analyses the barriers to access training and learning oppor-
tunities for digitally excluded and hard-to reach employees
 Investigating the use of artificial intelligence (AI) in learning and development
 Learning and training for Social Care
 Maintaining the delivery and practice of Promoting Positive Behaviour (PPB)
 Implementing the improvements to the course structure and content arising from the
review of PPB, thereby ensuring it remains current and appropriate in all contexts 
 Building and maintaining internal capacity to deliver PPB
 Monitoring and reviewing the licence to use PPB in Orkney Islands Council and sup-
porting its wider implementation across services
 Accredited Front Line Management training (CMI).
Although the established infrastructure, culture, and practice within the Clyde Valley Project
continues to promote and facilitate opportunities for networking and sharing best practice,
this remains a function of the individuals representing each Member Council. Once again, a
significant number of key council employees who had played a pivotal role in facilitating
Clyde Valley activities have retired or moved on to new responsibilities. This includes Project
staff, lead representatives from Member Councils and other stakeholders in specific projects.
In 2024 the Chair of the PPB Strategic Governance Group retired, and this was followed by
the current Project Manager for the overall project in May 2025. Successors for both of these
posts are now in place, but there is always a learning curve when such experienced team
members depart. The challenge for member councils is to maintain continuity while adapting
to these personnel changes, and thereafter to replicate the individual and collective
contributions made by previous employees to ensure the success and outcomes achieved to
date is sustained. 
The established infrastructure and networks within the Group have allowed collaborative
work to continue through virtual meetings and learning events, shared content for front line
and redeployed services and the delivery of online learning in unprecedented numbers
across the Group. Attendance at Clyde Valley meetings online using Teams remains high
and this model is now the recognised and preferred method. For the Group’s more distantly
located Members, this has allowed attendance at every meeting. 
In 2025 it was recognised that the re-establishment of more frequent Steering Group
meetings should be a priority in the coming year. Work is underway to establish that, with
new Project Manager now in post. 
Notwithstanding the above, the project governance structure for guiding corporate initiatives
and the Social Care Group managing the Health and Social Care agenda continues to work
47

Page 48

6 
well in terms of providing governance and strategic direction. This approach continues to
reflect the scope of influence over each dimension of the project as well as the resourcing
implications of delivering the Project’s programmes. In addition, the specific governance
structure for the PPB programme functions effectively through three tiers of governance. The
membership categories and fee structure for membership were retained for 2025/2026. This
approach provides a viable basis to contribute project running costs as well as providing a
suitable fund to enable additional key Project support activities to be commissioned. 
There are three categories of membership made available to Councils for the project, these
include full, participating and procurement membership. For the year 2025/2026 the project
has five full members and eight participating members. For the third year running this
number presents a risk to the project’s sustainability as five full members is the stated
minimum number. 
The income of £0.071 million met the designated minimum level to support a contribution to
running costs for South Lanarkshire Council as lead authority (this amount included the
external audit fees). 
Existing Programmes and Project Activity 
The primary focus has continued to be on consolidation of established Project work
implemented by the Group. These reflect those activities which were initiated through the
Clyde Valley Project, and which are now integrated into standard business practice for
Member Councils. These include e-learning, Promoting Positive Behaviour, Social Care
training and accredited management and leadership training. 
The e-Learning Group 
The CVLDG e-Learning Group is one of the longest established and most productive
networks within the Clyde Valley Group. It meets regularly on a six-weekly cycle via MS
Teams. Attendance at the meetings remains encouragingly high with regular attendances of
15 members. 
The Social Care Group 
The CVLDG Social Care Group drives and delivers the Project’s collaborative activities
under the Social Work and Social Care agenda. As the originators of the flagship
programme Promoting Positive Behaviour (PPB), the Social Care Group also assumes a
crucial role in the programme’s governance and management.
The PPB Programme has been used across the Clyde Valley Group for thirteen years.
In 2024/25, the Social Care Group devised its forward workplan of topics for collaborative
development. These are: 
 Dementia strategy
 Newly Qualified Social Workers (NQSW) supported year
 New arrangements for registered workers
 UNCRC legislation (for all business – not just childcare)
 Dealing with inconsistency and mixed messages in Care Inspection reports
 Health and Social Care staffing 
These topics along with existing programmes will continue to form the basis of the Social
Care Group’s agenda over 2026/27.
48

Page 49

7 
Financial Performance 
The Comprehensive Income and Expenditure Statement and its accompanying notes and
statements summarise the costs and sources of funding in conducting the Joint Committee’s
activities. 
For 2025/2026, the Revenue Expenditure results for the Committee are shown on page 13.
This shows a net surplus position of £0.013m on the Comprehensive Income and
Expenditure Statement, representing Member contributions not used for project work in-
year. This net surplus will be added to the accumulated reserves balance brought forward
from 2024/2025. 
Support expenses of £0.059m were paid to South Lanarkshire Council. The Project also
incurred expenditure on Training Costs £0.028m. The training costs relate to annual City and
Guilds subscriptions and accredited management training which is provided to employees
across Member Councils by the Chartered Management Institute. 
These costs are incurred by Clyde Valley and recharged to individual Member Councils at
the end of the financial year. Costs associated with other streams of Clyde Valley activity are
incurred directly by individual authorities. The audit fee for 2025/2026 was £0.002m. 
The Committee's income is made up of contributions from Member Councils (£0.071m in
2025/2026). There is a General Fund Balance comprising accumulated underspends since
the inception of the Project in 2007/2008. The surplus of £0.013m for 2025/2026, will be
added to this General Fund balance and the remaining monies will be used for future
progress on the project.   
This reflects the practical arrangement that exists between the Joint Committee and South
Lanarkshire Council where the Council’s Loans Fund lends or borrows according to the
required cash flow and activities of the Committee. 
The Statement of Accounting Policies has been included which details the policies
implemented when compiling and presenting the Comprehensive Income and Expenditure
Account, Balance Sheet and related statements. The accounting policies are those
recommended by the Code of Practice on Local Authority Accounting in the United Kingdom,
as supported by the International Financial Reporting Standards. 
The Statement of Responsibilities advises that the Head of Finance (Strategy) for South
Lanarkshire Council is the designated Treasurer to the Committee and is responsible for the
proper administration of the Committee's financial affairs.  Full details of the Treasurer's
responsibilities are included in the statement. 
49

Page 50

8 
Outlook 
Maintaining membership and commitment to the Clyde Valley Learning and Development
Group is an ongoing challenge, particularly with the pressure on diminishing resources for
Member councils. As the number of Full Membership Councils remains at the threshold
minimum level of five (in terms of paragraph 12.2 of the Minute of Agreement), this remains
a risk to the project’s sustainability for next year. 
A review is being undertaken into the future governance arrangements of the Clyde Valley
Learning and Development Joint Committee to identify the most appropriate operating model
going forward. 
The Clyde Valley Councils have continued to demonstrate great resilience and an appetite
for collaboration that bodes well for the future. Attendances at online meetings and
development groups during the past year was once again consistently high and the workload
on project activities is shared out well across member councils. 
Priorities will remain the delivery of online learning to all councils and ensuring that the
infrastructure is in place to support this effectively. Plans are in place to maintain continuity
at the end of the current procurement contract for this service, ensuring the benefits realised
to date from our shared approach continues. 
The Joint Committee will continue to seek out opportunities to deliver innovation in learning
and development through collaborative working and maintain the continuity and quality of
our online products. 
The membership funding structure will continue to be monitored and evaluated in terms of
achieving best value for the Member Councils. Further projects and extended workplans will
be identified and delivered to maximise the benefits achieved from the Project fund. For this
to happen the goodwill, time and resources allocated to the work by Members remains
central to the success of the Project. 
Lorraine O’Hagan
Treasurer – Clyde Valley Learning and Development Joint Committee 
Councillor Lynsey Hamilton
Convener – Clyde Valley Learning and Development Joint Committee 
50

Page 51

9 
Annual Governance Statement 
The Joint Committee is responsible for establishing effective governance arrangements for
its activities to ensure the effective operation of its functions. This includes ensuring proper
systems are in place for managing risk and maintaining internal controls. 
While the Joint Committee’s governance arrangements have not been consolidated in a
formal Code of Corporate Governance, the Annual Governance Statement has been
prepared within the context of the Joint Committee’s governance framework and meets
legislative requirements to include the Annual Governance Statement within the Annual
Accounts.   
Scope of Responsibility 
In delivering its aims and objectives, the Joint Committee is accountable for ensuring that its
operations are conducted in compliance with the law and established standards, while
safeguarding public funds, ensuring proper accountability, and using resources
economically, efficiently, and effectively. Additionally, the Joint Committee is legally
obligated to make arrangements to secure best value as outlined in the Local Government in
Scotland Act 2003. To fulfil this duty, the Elected Members and senior officers of the Joint
Committee are responsible for implementing appropriate arrangements for its operations
and enabling the effective execution of its functions, including arrangements for the
management of risk. 
Governance Framework 
The Joint Committee maintains an internal control system aimed at managing risk to an
acceptable level. However, internal controls cannot completely eliminate the risk of failing to
meet policies, goals, and objectives, so they can only offer reasonable assurance, not
absolute assurance of effectiveness. The internal control system is part of a continuous
process designed to identify and prioritise risks that could affect the achievement of the Joint
Committee’s policies, goals, and objectives, assess the likelihood of these risks occurring,
and evaluate their potential impact if they do. 
The main features of our governance arrangements are:- 
 All Full Member Councils continue to be represented on the Joint Committee.
 The scheme of delegation, terms of reference, financial regulations and stakeholder
roles and responsibilities defined in 2007/2008 remain in place and have been
reviewed for relevance and to determine if they are still appropriate.  The standing
orders were most recently updated and approved in 2023. 
 Meetings of the Joint Committee are held three times a year chaired by the Convener
of the Joint Committee. For 2025/2026, Lynsey Hamilton (South Lanarkshire) was
Convenor until 27 April 2025, and then again from 12 January 2026 onward.  Gavin
Keatt (South Lanarkshire) covered the period from 28 April 2025 to 11 January 2026,
as Council Member of the Joint Committee and the Convener of the Joint Committee.
 Scheme of Delegation allows for Clyde Valley Project Steering Group to manage, direct
and prioritise the work programme.
 The previous Minute of Agreement approved by each of the participating Councils,
reflecting the changes in membership and fee structure for 2019/2020 onwards still
stands.
 Effective risk management arrangements are embedded within the Member Councils. 
51

Page 52

10 
The system of internal controls is based on a framework of regular management information,
financial regulations, administrative procedures, management and supervision and a system
of delegation and accountability.   
These arrangements follow the systems of financial management in place within the lead
authority, South Lanarkshire Council and are subject to the relevant controls in place which
are reviewed by the Internal/External Audit through a programme of audit work.  The overall
audit opinion for the Joint Committee is informed by the assurances obtained from systems
audits carried out by Internal Audit on the Council’s shared systems.   
The system includes:- 
 Centralised invoicing and re-charging administered through South Lanarkshire Council.
 Financial Management arrangements through South Lanarkshire Council’s Oracle
Fusion system supported by Financial Regulations.
 Risks are identified and managed by the Project Manager on an ongoing basis.
 Preparation of financial reports that compare actual expenditure and income against
budgets.
 Employees adhere to the range of policies including the Counter Fraud, Bribery and
Corruption Policy Statement and Strategy, Fraud Response Plan, Whistleblowing for
Third Parties and Confidential Reporting procedures operated by South Lanarkshire
Council.  These continue to be updated to reflect best practice and support a culture of
ethical behaviour amongst employees and Councillors. 
Statement on the Role of the Chief Financial Officer 
CIPFA published the statement on the role of the Chief Financial Officer in 2010 and under
the Code, the Joint Committee is required to state whether it complies with the statement,
and if not, to explain how their governance arrangements deliver the same impact. 
The Joint Committee’s financial management arrangements comply with the principles set
out in CIPFA’s statement on the Role of the Chief Financial Officer. 
Financial Resilience 
A key goal of the CIPFA FM Code is to improve the financial resilience of organisations by
embedding enhanced standards of financial management.  This includes a statement on the
adequacy of reserves.  In February 2026, the 2026/2027 Membership and Funding paper
was presented to the Joint Committee and although the paper did not include a formal
statement on the adequacy of reserves, it did evaluate the adequacy of funding for the
upcoming year (2026/2027) and concluded that it would be sufficient to support the Project
as a going concern, with reserves available to assist with other Project work. 
52

Page 53

11 
Continuous Improvement 
As the work of the Clyde Valley Learning and Development Joint Committee develops, I am
aware of our governance duties and will continue my commitment to transparency and
openness in our governance arrangements. No issues have been identified during
2025/2026 and I will continue to review these as appropriate during 2026/2027. 
Assurance 
The system of internal control can provide only reasonable and not absolute assurance that
assets are safeguarded, that transactions are properly recorded, and that material errors or
irregularities are either prevented or would be detected within a timely period. 
It is my view that in the nineteenth year of the Clyde Valley Learning and Development Joint
Committee (financial year 2025/2026), reasonable assurance can be placed on the
adequacy and effectiveness of the Committee’s framework of governance, risk management
and control arrangements. 
Lorraine O’Hagan
Treasurer - Clyde Valley Learning and Development Joint Committee 
Councillor Lynsey Hamilton
Convener - Clyde Valley Learning and Development Joint Committee 
53

Page 54

12 
Movement in Reserves Statement 
The Movement in Reserves Statement shows the movement in the year on the different
reserves held by the Joint Committee, analysed into useable reserves and other reserves.
This gives a summary of the changes that have taken place in the funding section of the
Balance Sheet over the financial year. 
2025/2026  General
Fund
Balance
Total
Usable
Reserves
Total
Unusable
Reserves 
Total
Reserves 
£000 £000 £000 £000
Balance at 31 March 2025 64 64 - 64
Movement in Reserves during 2025/2026    
Surplus on the provision of services 13  13 - 13
Other comprehensive income and expenditure - - - -
Total comprehensive income and expenditure 13 13 - 13
Adjustments between accounting basis and
funding basis
- - - -
Net increase before transfers to / from other
statutory reserves
- - - -
Transfers to / from other statutory reserves - - - -
Increase / (Decrease) in 2025/2026 13 13 - 13
Balance as at 31 March 2026 77 77 - 77 
2024/2025  General
Fund
Balance
Total
Usable
Reserves
Total
Unusable
Reserves 
Total
Reserves 
£000 £000 £000 £000
Balance at 31 March 2024 49 49 - 49
Movement in Reserves during 2024/2025    
Surplus on the provision of services 15 15 - 15
Other comprehensive income and expenditure - - - -
Total comprehensive income and expenditure 15 15 - 15
Adjustments between accounting basis and
funding basis
- - - -
Net increase before transfers to / from other
statutory reserves
- - - -
Transfers to / from other statutory reserves - - - -
Increase / (Decrease) in 2024/2025 15 15 - 15
Balance as at 31 March 2025 64 64 - 64 
54

Page 55

13 
Comprehensive Income and Expenditure Statement
For the Year Ended 31 March 2026 
The Comprehensive Income and Expenditure Statement gives a summary of resources
generated and consumed by the Joint Committee in the year. 
2024/2025 
£000  
2025/2026 
£000  Notes     
59  Support Expenses paid to South Lanarkshire Council 59 
23   Training Costs for Member Councils     
28 
2  Payments to Other Bodies 2 1     
84  Total Expenditure 89 
(99)  Income (102) 
(15)  (Surplus) / Deficit on Provision of Service (13) 
(15)  Total Comprehensive Income and Expenditure (13) 
55

Page 56

14 
Balance Sheet as at 31 March 2026 
The Balance Sheet summarises the assets and liabilities of the Joint Committee at the
Balance Sheet date. 
31 March
2025
£000   
31 March
2026
£000
Notes                    
Current Assets   
102  Short Term Investments  89 2      
102  Total Current Assets  89 
Current Liabilities   
(38)  Creditors  (12) 3      
64  Net Current Assets  77 
Represented By:   
64  General Fund Balance  77 
64    77 
The notes on pages 16-18 form part of the financial statements. 
The unaudited accounts were approved for issue by the Board on 8 June 2026, and the
audited accounts were authorised for issue on 14 September 2026 on behalf of the Board
by: 
Lorraine O’Hagan
Treasurer – Clyde Valley Learning and Development Joint Committee  
56

Page 57

15 
Cash Flow Statement
For the year ended 31 March 2026 
The Cash Flow Statement shows the changes in cash and cash equivalents held by the
Clyde Valley Learning and Development Joint Committee during the reporting year.
The statement shows how the Joint Committee generates and uses cash and cash
equivalents by classifying cash flows as operating and investing activities. 
2024/2025
£000 
2025/2026
£000     
(15) Net (surplus) on the provision of services  (13)
4       Adjust net surplus or deficit on the provision of services for non-
cash movements 
26
(11) Net cash flows from Operating Activities 13
11         Investing Activities (note below) (13)
0 Net increase or decrease in cash and cash equivalents 0   
0 Cash and cash equivalents at the beginning of the reporting
year
0
0 Cash and cash equivalents at the end of the reporting year 0   
Cash Flow Statement Note - Non-Cash Movements 
2024/2025
£000  Description 
2025/2026
£000
0 Movement in Debtors 0
4 Movement in Creditors 26
4  26 
Cash Flow Statement Note – Investing Activities 
2024/2025
£000 
2025/2026
£000
11 Purchase or (Sale) of short-term and long-term investments  (13)
11 Net cash flows generated from/ (used in) investing
activities
(13) 
57

Page 58

16 
Notes to the Accounts 
1 Auditors’ Remuneration
The auditors’ remuneration is included in the Payments to Other Bodies’ 
expenditure.   
2025/2026
£000
2024/2025
£000
Auditors’ Remuneration:  
Fees payable to Audit Scotland with regard to external
audit services carried out by the appointed auditors
2 2  
2  2 
In 2025/2026, Clyde Valley Learning and Development Joint Committee has incurred
fees of £2,570 for the statutory audit of the financial statements by Audit Scotland.
The comparable figure for 2024/2025 was £2,460. Fees payable in respect of other
services provided by the appointed auditor were £nil. (2024/2025: £nil) 
The £2,000 auditors remuneration detailed within the financial statements and this
note reflects the net impact of a reversal of a prior year over-accrual of £948 and the
2025/2026 fee of £2,570. 
2 Financial Instruments 
The following category of financial instrument is carried in the balance sheet: 
31 March
2026
£000
31 March
2026
£000
31 March
2026
£000
31 March
2025
£000
31 March
2025
£000
31 March
2025
£000 
Investments  Long Term  Current  Total  Long
Term 
Current  Total
Loans and
Receivables
0 89 89 0 102 102
Total
Investments
0 89 89 0 102 102 
3 Creditors 
The Creditors figure is analysed as follows: 
2025/2026
£000 
2024/2025
£000
Audit fee 2  3
Prepaid Contributions from Local Authorities 10  33
Other Creditors 0  2 
12  38
58

Page 59

17 
4 Related Parties 
The Clyde Valley Learning and Development Joint Committee is required to disclose
material transactions with related parties – bodies or individuals that have the
potential to control or influence the Joint Committee. Disclosure of these transactions
allows readers to assess the extent to which the Joint Committee might have been
constrained in its ability to operate independently or might have secured the ability to
limit another party’s ability to bargain freely with the Joint Committee. 
All transactions with Councils were entered into under the terms of the Joint 
Committee and, where appropriate, reported through the Joint Committee. During the
year the Joint Committee transacted with the following Councils: 
Local Authorities
Receipts
2025/2026
£000 
Payments
2025/2026
£000 
Receipts
2024/2025
£000 
Payments
2024/2025
£000
South Lanarkshire 12  59  12  59
North Lanarkshire  13  0  12  0
Glasgow City 15  0  14  0
East Renfrewshire  12  0  7  0
Inverclyde  6  0  7  0
Total 58  59  52  59 
While there were no transactions with the Scottish Government during 2025/2026, it
is still considered a related party.  This is due to its role in setting public sector
legislative frameworks and its role in funding the member councils of Clyde Valley
Learning and Development Joint Committee.   
At the year end the Joint Committee held Short Term Investments and creditor
balances with the Local Authorities detailed below: 
Local
Authorities
Short Term
Investment
Balances
2025/2026
£000  
Creditors
Balances
2025/2026
£000 
Short Term
Investment               
Balances
2024/2025      
£000 
Restated
Creditors
Balances
2024/2025
£000
South
Lanarkshire
89  0  102  0
North
Lanarkshire
0  0  0  10
Total 89  0  102  10 
The Creditor Balances for 2024/2025 has been restated from £64,000 to £nil due to
the reclassification of balances originally shown as owed to South Lanarkshire
Council, to reflect their status as Reserves. 
5 Financing and Management of Liquid Resources 
Liquid Resources are held by South Lanarkshire Council as lead authority and are
available to Clyde Valley Learning and Development Joint Committee as required. 
59

Page 60

18 
6 Remuneration Report 
The Local Authority Accounts (Scotland) Amendment Regulations 2014 require local
authorities in Scotland to prepare a Remuneration Report as part of the Financial
Statements. 
In accordance with the Regulations, and the relevant definition of individuals that are
to be disclosed in this report, Clyde Valley Learning and Development Joint
Committee has no employees that require to be disclosed. 
Clyde Valley Learning and Development Joint Committee makes no payment of
salary, allowances or pension contributions to any of the Councillors who are
appointed as Members of the Joint Committee. 
7 Date of Signing of the Accounts 
The audited accounts were authorised for issue on 14 September 2026 by the
Treasurer to the Clyde Valley Learning and Development Joint Committee. 
8 Post Balance Sheet Events 
No events occurred between 1 April 2026 and 14 September 2026 that would have
an impact on the 2025/2026 financial statements.  The later date is the date on which
the audited accounts were authorised for issue by the Treasurer to the Clyde Valley
Learning and Development Joint Committee. 
9 Going Concern  
The accounts have been prepared on the going concern basis on the basis that
funding from Local Authorities has been received for 2026/2027. 
60

Page 61

19 
Statement of Accounting Policies 
(a) General
The general policies adopted in compiling and presenting the financial statements are
those required by the Local Authority Accounts (Scotland) Regulations 2014, section
12 of the Local Government in Scotland Act 2003, requires they be prepared in
accordance with proper accounting practices. These practices primarily comprise
Code of Practice on Local Authority Accounting in the United Kingdom 2023/2024,
issued jointly by the Chartered Institute of Public Finance and Accountancy (CIPFA)
and the Local Authority (Scotland) Accounts Advisory Committee (LASAAC),
supported by International Financial Reporting Standards (IFRS). There are no
significant departures from those recommendations. 
The accounts have been prepared under the historic cost convention and accounting
policies have been applied consistently. 
(b)   Accruals basis
The Comprehensive Income and Expenditure Statement is compiled on an accrual’s
basis. Income and expenditure activities are accounted for in the year which they take
place, not simply when payments are made or received.  Where services have been
provided but the income not received by end 31 March 2026 or services have been
received but not paid for by end 31 March 2026, then the income and expenditure
account has been amended to reflect the outstanding amounts and a debtor or
creditor for the relevant amount is recorded in the balance sheet. 
(c) Debtors and Creditors
All specific and material sums payable to and paid by the Clyde Valley Learning and
Development Joint Committee have been brought into account.   
(d) Allocation of Support Expenses 
The allocation of Support Expenses is the cost of those South Lanarkshire employees
who provide a direct service to the Clyde Valley Learning and Development Joint
Committee. The individual support department is Personnel Services where
employees are directly involved in the operations of the Clyde Valley Learning and
Development Joint Committee. The recharge is made on a consistent basis. 
(e) Borrowing Facilities
The Clyde Valley Learning and Development Joint Committee is a separate legal
entity and has South Lanarkshire Council as its lead authority. The loans’ fund of
South Lanarkshire Council acts as banker to the Joint Committee and consequently
lends or borrows according to the required cash flow and activities of the Joint
Committee. 
(f) Financial Instruments 
For investments due within 12 months, prevailing benchmark rates have been used to
provide the fair value.  Where an instrument has a maturity of less than 12 months the
fair value is taken to be the principal outstanding.  Creditors due within 12 months are
not classed as a financial instrument.  
61

Page 62

20 
(g) Reserve – General Fund Balance 
The Joint Committee Members agreed that any surplus on the Income and
Expenditure Account at the end of the financial year will be carried forward and held
in a General Fund Reserve for use on Clyde Valley projects in future financial years. 
The value of the funding being carried forward will be reviewed on an annual basis. 
62

Page 63

21 
Statement of Responsibilities for the Annual Accounts 
The Clyde Valley Learning and Development Joint Committee’s responsibilities: 
The Clyde Valley Learning and Development Joint Committee is required to:- 
 make arrangements for the proper administration of its financial affairs and to secure
that one of its officers has the responsibility for the administration of those affairs. For
the Joint Committee, that officer is the Executive Director of Finance and Corporate
Resources designated as Treasurer of the Joint Committee;
 manage its affairs to secure economic, efficient and effective use of resources and
safeguard its assets; 
 ensure the Annual Accounts are prepared in accordance with legislation (The Local
Authority Accounts (Scotland) Regulations 2014), in accordance with proper accounting
practices (section 12 of the Local Government in Scotland Act 2003); and
 approve the Annual Accounts for signature. 
I confirm that these accounts were issued by the Joint Committee at its meeting on 8 June
2026, and approved on 14 September 2026 
Signed on behalf of Clyde Valley Learning and Development Joint Committee 
Councillor Lynsey Hamilton
Convenor – Clyde Valley Learning and Development Joint Committee 
The Treasurer’s responsibilities:
The Treasurer is responsible for the preparation of the Clyde Valley Learning and
Development Joint Committee’s Annual Accounts in accordance with proper practices set
out in the CIPFA/LASAAC Code of Practice on Local Authority Accounting in the United
Kingdom (the Code). 
In preparing the Annual Accounts, the Treasurer has:-
 selected suitable accounting policies and then applied them consistently; 
 made judgements and estimates that were reasonable and prudent; 
 complied with the local authority Code. 
The Treasurer has also:-
 kept proper accounting records which were up to date;
 taken reasonable steps for the prevention and detection of fraud and other
irregularities. 
I certify that the Annual Accounts give a true and fair view of the financial position of the
Joint Committee at 31 March 2026 and its income and expenditure for the year ended 31
March 2026. 
63

Page 64

22 
Lorraine O’Hagan
Treasurer – Clyde Valley Learning and Development Joint Committee
64

Page 65

23 
Independent auditor’s report to the members of Clyde Valley Learning and
Development Joint Committee and the Accounts Commission 
Reporting on the audit of the financial statements 
Opinion on financial statements 
I certify that I have audited the financial statements in the annual accounts of Clyde Valley
Learning and Development Joint Committee for the year ended 31 March 2026 under Part
VII of the Local Government (Scotland) Act 1973. The financial statements comprise the
Movement in Reserves Statement, Comprehensive Income and Expenditure Statement,
Balance Sheet, Cash Flow Statement, and notes to the financial statements, including
material accounting policy information. The financial reporting framework that has been
applied in their preparation is applicable law and UK adopted international accounting
standards, as interpreted and adapted by the Code of Practice on Local Authority
Accounting in the United Kingdom 2025/26 (the 2025/26 Code). 
In my opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the Clyde Valley Learning and
Development Joint Committee as at 31 March 2026 and of its income and
expenditure for the year then ended; 
• have been properly prepared in accordance with UK adopted international accounting
standards, as interpreted and adapted by the 2025/26 Code; and 
• have been prepared in accordance with the requirements of the Local Government
(Scotland) Act 1973, The Local Authority Accounts (Scotland) Regulations 2014, and
the Local Government in Scotland Act 2003. 
Basis for opinion 
I conducted my audit in accordance with applicable law and International Standards on
Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the
Accounts Commission for Scotland. My responsibilities under those standards are further
described in the auditor’s responsibilities for the audit of the financial statements section of
my report. I was appointed by the Accounts Commission on 16 March 2023. My period of
appointment is five years, covering 2022/23 to 2026/27. I am independent of the Clyde
Valley Learning and Development Joint Committee in accordance with the ethical
requirements that are relevant to my audit of the financial statements in the UK including the
Financial Reporting Council’s Ethical Standard, and I have fulfilled my other ethical
responsibilities in accordance with these requirements. Non-audit services prohibited by the
Ethical Standard were not provided to the Clyde Valley Learning and Development Joint
Committee. I believe that the audit evidence I have obtained is sufficient and appropriate to
provide a basis for my opinion. 
65

Page 66

24 
Conclusions relating to going concern basis of accounting 
I have concluded that the use of the going concern basis of accounting in the preparation of
the financial statements is appropriate.
Based on the work I have performed, I have not identified any material uncertainties relating
to events or conditions that, individually or collectively, may cast significant doubt on the
Clyde Valley Learning and Development Joint Committee’s ability to continue to adopt the
going concern basis of accounting for a period of at least twelve months from when the
financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the Clyde Valley
Learning and Development Joint Committee’s current or future financial sustainability.
However, I report on the Clyde Valley Learning and Development Joint Committee’s
arrangements for financial sustainability in a separate Annual Audit Report available from
the Audit Scotland website. 
Risks of material misstatement 
I report in my Annual Audit Report the most significant assessed risks of material
misstatement that I identified and my judgements thereon. 
Responsibilities of the Treasurer and Clyde Valley Learning and Development Joint
Committee for the financial statements 
As explained more fully in the Statement of Responsibilities, the Treasurer is responsible for
the preparation of financial statements that give a true and fair view in accordance with the
financial reporting framework, and for such internal control as the Treasurer determines is
necessary to enable the preparation of financial statements that are free from material
misstatement, whether due to fraud or error.
In preparing the financial statements, the Treasurer is responsible for assessing the Clyde
Valley Learning and Development Joint Committee’s ability to continue as a going concern,
disclosing, as applicable, matters related to going concern and using the going concern
basis of accounting unless there is an intention to discontinue the Clyde Valley Learning and
Development Joint Committee’s operations.
The Clyde Valley Learning and Development Joint Committee is responsible for overseeing
the financial reporting process. 
Auditor’s responsibilities for the audit of the financial statements 
My objectives are to obtain reasonable assurance about whether the financial statements as
a whole are free from material misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes my opinion. Reasonable assurance is a high level of
assurance, but is not a guarantee that an audit conducted in accordance with ISAs (UK) will
always detect a material misstatement when it exists. Misstatements can arise from fraud or
error and are considered material if, individually or in the aggregate, they could reasonably
be expected to influence the decisions of users taken on the basis of these financial
statements. 
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I
design procedures in line with my responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include: 
66

Page 67

25 
• using my understanding of the local government sector to identify that the Local
Government (Scotland) Act 1973, The Local Authority Accounts (Scotland)
Regulations 2014, and the Local Government in Scotland Act 2003 are significant in
the context of the Clyde Valley Learning and Development Joint Committee;
• inquiring of the Treasurer as to other laws or regulations that may be expected to
have a fundamental effect on the operations of the Clyde Valley Learning and
Development Joint Committee;
• inquiring of the Treasurer concerning the Clyde Valley Learning and Development
Joint Committee’s policies and procedures regarding compliance with the applicable
legal and regulatory framework;
• discussions among my audit team on the susceptibility of the financial statements to
material misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate competence and
capabilities to identify or recognise non-compliance with laws and regulations. 
The extent to which my procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the Clyde
Valley Learning and Development Joint Committee’s controls, and the nature, timing and
extent of the audit procedures performed. 
Irregularities that result from fraud are inherently more difficult to detect than irregularities
that result from error as fraud may involve collusion, intentional omissions,
misrepresentations, or the override of internal control. The capability of the audit to detect
fraud and other irregularities depends on factors such as the skilfulness of the perpetrator,
the frequency and extent of manipulation, the degree of collusion involved, the relative size
of individual amounts manipulated, and the seniority of those individuals involved. 
A further description of the auditor’s responsibilities for the audit of the financial statements
is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of my auditor’s report. 
Reporting on other requirements 
Other information 
The Treasurer is responsible for the other information in the annual accounts. The other
information comprises the Management Commentary, Annual Governance Statement and
Statement of Responsibilities. 
My responsibility is to read all the other information and, in doing so, consider whether the
other information is materially inconsistent with the financial statements or my knowledge
obtained in the course of the audit or otherwise appears to be materially misstated. If I
identify such material inconsistencies or apparent material misstatements, I am required to
determine whether this gives rise to a material misstatement in the financial statements
themselves. If, based on the work I have performed, I conclude that there is a material
misstatement of this other information, I am required to report that fact. I have nothing to
report in this regard. 
My opinion on the financial statements does not cover the other information and I do not
express any form of assurance conclusion thereon except on the Management Commentary
67

Page 68

26 
and Annual Governance Statement to the extent explicitly stated in the following opinions
prescribed by the Accounts Commission. 
Opinions prescribed by the Accounts Commission on the Management Commentary and
Annual Governance Statement 
In my opinion, based on the work undertaken in the course of the audit: 
• the information given in the Management Commentary for the financial year for which
the financial statements are prepared is consistent with the financial statements and
that report has been prepared in accordance with statutory guidance issued under the
Local Government in Scotland Act 2003; and 
• the information given in the Annual Governance Statement for the financial year for
which the financial statements are prepared is consistent with the financial statements
and that report has been prepared in accordance with the Delivering Good
Governance in Local Government: Framework (2016). 
Matters on which I am required to report by exception 
I am required by the Accounts Commission to report to you if, in my opinion: 
• adequate accounting records have not been kept; or 
• the financial statements are not in agreement with the accounting records; or 
• I have not received all the information and explanations I require for my audit. 
I have nothing to report in respect of these matters. 
Conclusions on wider scope responsibilities 
In addition to my responsibilities for the annual accounts, my conclusions on the wider scope
responsibilities specified in the Code of Audit Practice, including those in respect of Best
Value, are set out in my Annual Audit Report. 
Use of my report 
This report is made solely to the parties to whom it is addressed in accordance with Part VII
of the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 108 of the Code of Audit Practice, I do not undertake to have responsibilities to
members or officers, in their individual capacities, or to third parties. 
Pauline Murray CPFA
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN 
68

Page 69

27 
Glossary of Terms 
Much of the terminology used in this Report is intended to be self-explanatory, however, the
following additional definition and interpretation of terms used may be helpful: 
1. Borrowing Facilities and Temporary Interest on Revenue Balances 
The loans fund of South Lanarkshire Council lends or borrows according to the cash
flow of the Clyde Valley Learning and Development Joint Committee.  This temporary
interest credited / debited to the Clyde Valley Learning and Development Joint
Committee’s Income and Expenditure Account reflects the interest earned or charged to
the Committee for funds lent to or borrowed from the loans fund of South Lanarkshire
Council. 
69

Page 70

28 
Clyde Valley Learning and Development Joint Committee Members (2025/2026) 
Council Member
East Renfrewshire Council Councillor Andrew Anderson
Glasgow City Council Councillor Anne McTaggart
Inverclyde Council Councillor Francesca Brennan (Vice Convener)
North Lanarkshire Council Councillor Angela Campbell
South Lanarkshire Council Councillor Lynsey Hamilton (Convener)
Councillor Gavin Keatt (Temporary Convener) 
70

Page 71

Report
Agenda Item 
Report to: Clyde Valley Learning and Development Joint
Committee
Date of Meeting: 14 September 2026
Report by: Head of Personnel Services, South Lanarkshire
Council  
Subject: Clyde Valley Learning and Development Group –
Governance Considerations – Progress to Date 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Joint Committee with an update on progress following the
reinstatement of the Steering Group, the consultation with members on the
governance arrangements and the Learning Management System transition
 seek approval to carry out a feasibility review of the Joint Committee, Steering
Group and subgroups with all members to establish a future delivery
arrangement 
2. Recommendation(s)
2.1. The Joint Committee is asked to approve the following recommendation(s):-
[recs]
(1) to note the progress made following the reinstatement of the Steering Group
as detailed at section 4;
(2) that a short, feasibility-led review is undertaken by the Clyde Valley Project
Lead of the Joint Committee, Steering Group and subgroups with all members
to establish a future delivery arrangement, as detailed in sections 5.1 to 5.3 of
the report and Appendix 3.  The output of which will be reported to the Joint
Committee on 8 February 2027; and
(3) to note the progress on the Learning Management System transition as
detailed at section 4.
[1recs]
3. Background
3.1. The Clyde Valley Learning and Development Group (CVLDG) was established in
October 2007 as a partnership between 8 local authorities in west central Scotland. 
South Lanarkshire Council (SLC) continues to be the lead authority since its
inception.  A high-level overview of CVLDG is provided in Appendix 1. 
3.2. As part of the ongoing review of governance arrangements, consideration was given
to membership levels, the sustainability of the sub-groups, the shared Learning
Management System, the cost and resource implications of the current Joint
Committee structure, and the scope of existing shared services.  
6
71

Page 72

3.3. These matters were considered at the last Joint Committee on 8 June 2026, where
four initial outcomes were discussed.  A high-level overview of the initial findings is
attached as Appendix 2. 
3.4. The Joint Committee approved the recommendation to reactivate the Steering Group
to communicate the outcomes, oversee the Learning Management System
transition, and coordinate next steps. 
4. Progress Overview
4.1 The progress made since the Joint Committee is detailed below:- 
4.2. Steering Group Reinstatement
All five full member councils were invited to attend the Steering Group, which took
place on 6 August 2026.  All five full members were in attendance.  Although not
required, and in the spirit of partnership working, an invitation was also extended to
participating members, some of whom chose to attend. 
4.3. Council members were welcomed back to the first reinstated Steering Group and
were provided with an update on the current position.  The discussion included the
initial findings previously considered by the Joint Committee on 8 June 2026, which
provided the evidence base for reviewing future governance and operating
arrangements. 
4.4. Governance Arrangements 
Discussion at the Steering Group was structured around the four initial outcomes
tabled at the Joint Committee in June 2026, as outlined in Appendix 2.  This included
consideration of:- 
 whether a more proportionate governance structure could reduce resource
pressures, as outlined per the initial findings
 whether the CVLDG remit should be widened
 how membership and financial viability could be protected
 whether sub-groups could operate independently if required 
4.5. Based on the initial findings, group members agreed that the legal advice presented
at the June 2026 Joint Committee was accurate and current governance
arrangements felt disproportionate and aged.  The Joint Committee structure was
created almost 20 years ago in a different funding and delivery context.  As a result,
it was agreed to carry out a feasibility review of the Joint Committee, Steering Group
and subgroups with all members to establish a future delivery arrangement.   
4.6. The steering group members highlighted the subgroups have continued without
effective Steering Group oversight for several years.  
4.7. Members of the Steering Group reflected that, while the Clyde Valley Learning and
Development Joint Committee could continue to play a role, the group agreed other
similar delivery arrangements are now being taken forward by the Improvement
Service.  It was also noted that all full and participating members are part of the
Improvement Service network.  The group recognised that this may lead to potential
duplication and supports the review of the CVLDG taking place.  
72

Page 73

4.8. All group members recognised that time and personnel had moved on since the
original arrangements were established.  Valuable work is being carried out in the
subgroups, but they could operate in a different way with a more efficient and
proportionate approach. 
4.9 The reinstated Steering Group therefore provides an opportunity to revisit the
founding principles of the Clyde Valley Learning and Development Group and
consider whether the current arrangements are appropriate, proportionate and
sustainable or alternative options are available. 
4.10. Members also queried whether the income generation figure of £59,000 remains
sufficient, should the work continue in some format, as it has not been reviewed for
some time.  Given year-on-year inflationary pressures, members agreed that future
funding requirements and membership fees should be considered as part of the
feasibility review. 
4.11. Members also questioned the return on membership fees and discussed what future
delivery could look like if each sub-group operated independently, however, this is
based on a like for like approach and this also needs to be considered in any future
operating arrangement. 
4.12 Feasibility Study
The feasibility study is designed to understand the current work taking place and
how this is best met and through which type of arrangement.  It will also consider
how any arrangement would work at a practical level, including the governance (if
needed), financial, operational and stakeholder implications.  The review will also
consider the benefits of maximising digital in any arrangement, for example, the use
of Microsoft Teams, AI, accessibility and sharing across Councils has expanded in
recent years. 
4.13. Membership
The Clyde Valley Project lead was notified late July 2026, that a further participating
member has confirmed that it will not renew its membership beyond 2026/2027. 
Financial viability has to be reviewed taking into account this notification.  Projected
income for 2027/2028 is £61,000, which is £2,000 above the minimum income level
of £59,000.  Any further reduction in membership would place the Group below the
viability threshold to operate, reinforcing the requirement to review future
governance, membership and delivery arrangements. 
4.14 Learning Management System (LMS)
There are currently 3 members using the existing LMS and they are considering their
options: to continue using the system or explore the market for other products.  The
current contract has been extended until July 2027 to allow members to decide next
steps. 
5. Recommendations and Next Steps
5.1. The Joint Committee is asked to approve a short, feasibility review to assess the
current and future working arrangements. 
5.2. The Clyde Valley Project Lead will carry out the feasibility review in consultation with
full member councils and relevant sub-groups (all members).  The review will
consider governance, accountability, membership, financial viability, staffing
capacity, legal and compliance requirements, risk and stakeholder impact, and will
73

Page 74

report the findings to the Steering Group on 17 October 2026 and the Joint
Committee on 8 February 2027. 
5.3. The feasibility study template attached at Appendix 3 will provide the framework for
this review and will ensure that any future recommendation is supported by a clear
evidence base before further decisions are taken. 
6. Employee Implications
6.1. There are no immediate employee implications arising from this report.  If the
operating structure changes, further consideration will be given to the level of
resource currently provided by South Lanarkshire Council to support CVLDG
programme administration, invoicing and project support. 
7. Financial Implications
7.1. To remain viable, the CVLDG requires a minimum of five full members, as set out in
the Minute of Agreement, and annual income of £59,000, as previously agreed by
the Joint Committee. 
7.2. For 2026/2027, membership totals 13 councils, of which five are full members,
generating income of £67,000. 
7.3. For 2027/2028, membership is projected to reduce to 11 councils, of which five will
be full members, generating income of £61,000.  This is £2,000 above the minimum
income level of £59,000 required for the CVLDG to remain viable.  Should
membership continue to decrease in the future, the income stream would fall below
the minimum income level outlined in the Minute of Agreement and previously
agreed by the Joint Committee. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications arising from this report for further consideration. 
9. Risk and Other Implications
9.1. The review provides an opportunity for the Clyde Valley Learning and Development
Group to consider future operating models.  A feasibility-led review will support an
evidence-based decision on whether a subgroup-led or other alternative model is
practical, affordable and capable of maintaining effective collaboration. 
9.2  There is a risk that continued reductions in membership and associated income
determines the viability of the Group.   
9.3  For full member councils, the review presents an opportunity to influence the future
direction of the work taking place and ensure governance arrangements remain
appropriate and deliver value for money.  For participating member councils, there
may be opportunities to access an enhanced range of collaborative learning and
development services and to participate in future delivery models where these
support local workforce priorities. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. There is no requirement for an integrated impact assessment or consultation with
Trade Unions.  Consultation will be carried out with full member councils and
relevant sub-groups as part of the feasibility review before any further
recommendation is made on future governance arrangements. 
74

Page 75

Michelle Milne
Head of Personnel Services
South Lanarkshire Council 
21 August 2026 
Previous References
 Clyde Valley Learning and Development Joint Committee – 8 June 2026 
Appendices
Appendix 1 – High level overview of Clyde Valley Learning and Development Group
Appendix 2 – Initial review findings
Appendix 3 – Feasibility study framework 
List of Background Papers
 Minute of Agreement - Clyde Valley Learning and Development Project 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Karen Gormal, Employee Development and Diversity Manager
E-mail:  karen.gormal@southlanarkshire.gov.uk 
75

Page 76

Appendix 1 
High level overview of Clyde Valley Learning and Development Group 
The CVLDG comprises of: - 
• the Joint Committee (JC) which is an elected member group that oversees CVLDG
governance.  Led by SLC, the JC meets three times per year to review or approve
decisions related to membership, projects, proposals, outcomes and benefits. 
• the Steering Group (SG) which is a senior officer committee of full member councils,
chaired by SLC.  It meets quarterly to oversee project development, review progress,
and manage funding. 
• Social Care Group (SCG) which coordinates a shared agenda of collaborative
projects, planned annually including:-
o PPB, created by CVLDG, provides training for practitioners and managers
working with adults, children, or in educational settings with challenging
behaviours.  Governance is structured at three levels: Strategic, Local, and
the Principal Trainers group, all overseen by SCG.  PPB councils run free
training programmes year-round within and between councils.
o the eLearning Group, led by SLC, meets every six weeks and is attended by
18 council representatives.
o the Chartered Management Institute (CMI) Group, chaired by SLC and meets
quarterly, works together to deliver accredited management and leadership
programmes. 
For the CVLDG to be viable, the Minute of Agreement (MoA) sets a minimum membership
level of 5 full member councils.  The Joint Committee has also agreed a minimum income
of £59,000.  For 2026/2027, 13 councils have taken up membership, with 5 joining as full
members and income of £67,000 generated.  For 2027/2028, membership is projected to
reduce to 11 councils, of which 5 will be full members, generating income of £61,000.  This
is £2,000 above the minimum income level required for the group to remain viable. 
As lead authority, SLC acts as an agent for and on behalf of the CVLDG for all financial
transactions including procurement, and SLC’s Financial Regulations and Standing Orders
on Contracts apply for all transactions and processes undertaken on behalf of the Group.    
76

Page 77

Appendix 2
Initial Findings 
Outcome 1 is to examine alternative structures to ease the resource demands of
running a Joint Committee (JC). 
The original structure was set up at the time of launch in 2007 and was funded by
the Scottish Government.  Initial findings suggest the current arrangement is
complex and not proportional to present day activity.  Legal advice confirmed the
constitution of the Joint Committee in terms of section 57 of the Local Government
(S) Act 1973 was considered the appropriate way to proceed following a funding
award from the Scottish Government almost 20 years ago.  Given that there are no
longer any conditional arrangements in place and there is no legal requirement or
need to have such a formal working arrangement, SLC as Lead Authority should
consider the most appropriate arrangement needed for current purposes of the
member authorities (all levels of membership) in consultation with the other full
members and with the groups which sit under the Steering Group. 
The initial findings highlighted SLC resources are heavily used to support the JC,
including the organisation and facilitation of pre-meetings and JC meetings,
oversight of budget control, engagement with Audit Scotland, preparation of financial
accounts, and general project management activities.  It has also been found that
SLC’s input to support these arrangements has increased over time without a
corresponding review of the funding arrangements or fee structure. 
SLC has established that other partners including the Improvement Service and
Scotland Excel can support and / or provide:- 
Scotland Excel
Mainly focuses on Procurement Services, Consultancy and the Scotland Excel
Academy, however, there are plans further down the line to expand including flexible
learning options and management and leadership. 
Improvement Service
An established shared-service and sector support model for Scottish Local
Government. 
These organisations could be considered as established potential alternative delivery
supports and model to the current CVLDG arrangement. 
Outcome 2 focused on assessing the potential for expanding the remit of the
CVLDG. 
SLC has identified potential opportunities to broaden its scope by incorporating
various workforce development initiatives, such as health and safety training,
management and leadership development, as well as equality and diversity
opportunities. 
It is recommended that the Steering Group be reactivated as it has not met for some
time, to facilitate the presentation of proposals to expand the remit of the CVLDG.  
77

Page 78

Outcome 3 focused on protecting CVLDG operations by expanding membership or
altering the structure. 
The findings highlighted at present, that only full members are involved in
governance, and there are no procurement-only members; fees match each
member's contribution. 
The future direction will depend on decisions regarding outcomes 1 and 2 and may
require reviewing the membership model to align with new governance and potential
offerings. 
Outcome 4 assessed the need for sub-groups and their ability to operate
independently. 
The initial findings found that all sub-groups vary in terms of productivity, however,
they all could operate on their own with no impact should CVLDG change its
strategic operating structure.  Each sub-group has the capacity to evolve in line with
any future arrangements with no impact to group members. 
Work has revealed that the eLearning Group currently lacks a structured work plan
with consistent outputs for developing shared modules.  It also suggested that
reactivating the Steering Group could offer a useful way to report progress, improve
oversight, and support a more defined collaborative delivery programme. 
Work has also found that CVLDG no longer receives a discounted rate from CMI, as
this arrangement ended in 2022.  It may be possible to investigate other providers
who are open to negotiating discounts for member councils.  Additionally, end users
have recently reported difficulties accessing the portal, negatively affecting their
studies; this issue should be addressed in any upcoming review of service provision. 
This work has also highlighted the position of the shared LMS.  The current contract
has been extended to July 2027 and procurement activity for a longer-term solution
has commenced.  However, the number of councils participating in the shared LMS
arrangement has reduced significantly from 8 to 3, reflecting a preference amongst
some councils to pursue their own solutions to better meet local requirements. 
The impact of this change raised the question as to whether a shared LMS remains
a viable option in its current form.  Should CVLDG continue under the existing
arrangements, there will be a requirement to consider how South Lanarkshire
Council protects its interests through the contract and wider governance
arrangements. 
78

Page 79

Appendix 3 
Feasibility Review 
Introduction
This feasibility review will provide an evidence-based assessment of the current Clyde
Valley Learning and Development Group (CVLDG) arrangements and consider whether
alternative governance and delivery models may better support future collaborative learning
and development activity.  The review will examine strategic fit, governance, financial
sustainability, staffing capacity, legal and compliance requirements, risk and stakeholder
impact, alongside opportunities to modernise delivery through digital and partnership
approaches.  The purpose is to inform future decision-making by identifying the most
appropriate, proportionate and sustainable arrangements for participating councils.
Scope, purpose, and decision-making criteria
Scope: The feasibility study will examine both the current operation of the three existing
sub-groups and the practical implications of moving to a subgroup-led delivery model in
future.  It will consider current remit, membership, governance, resources, decision-making
arrangements, reporting lines, funding, delivery activity and dependencies.  It will then
assess what roles, responsibilities, funding arrangements, governance controls and
practical support would be required if the sub-groups were to continue under a subgroup-
led model.
Purpose: The purpose of the feasibility study is to create a balanced evidence base.  It will
confirm what is happening now, identify any gaps or dependencies in current
arrangements, and assess whether a subgroup-led delivery model would be practical,
affordable, sustainable and beneficial.  The study will help clarify who would need to do
what, when, where and how before any recommendation is made on future operating
arrangements.
Decision-making criteria: The feasibility study will assess each sub-group against the
following criteria:
• strategic fit
• governance and accountability
• financial viability
• staffing and capacity
• legal and compliance requirements
• risk management
• impact on stakeholders 
79

Page 80

Name of Council: 
Type of Membership: 
Overarching Question:
What is the most appropriate, proportionate and sustainable arrangement to support
collaborative learning and development across participating councils over the next five
years, and what evidence supports that conclusion?"
Response: 
80

Page 81

Feasibility Review Questionnaire 
Decision-
making
criteria
Feasibility questions Comments / evidence / source
Strategic
need and
Future
Purpose
Is there a continued strategic need
for a Clyde Valley-wide
collaborative learning and
development arrangement? 
What needs are currently being
met through CVLDG that would not
otherwise be met through existing
council arrangements, the
Improvement Service or other
partnerships? 
If the group did not exist, what
impact would this have on
participating councils? 
What future workforce, learning or
organisational development
challenges could best be
addressed collaboratively? 
Is the current remit still relevant or
should the focus be narrowed,
expanded or fundamentally
redesigned? 
Future
Operating
Model
What future operating model would
best meet member needs?
• Continue current
arrangements.
• Simplified Steering Group
model.
• Sub-group independence.
• Improvement Service
hosted arrangement.
• Lead authority partnership
model.
• Virtual network/community
of practice.
• Wind-down and cessation. 
81

Page 82

• What are the advantages,
disadvantages, costs and
risks of each option?
• Which option delivers the
greatest value for money
and organisational benefit?
Membership
and
Sustainability
Why do councils currently
participate? 
Why have councils left or reduced
participation? 
What would encourage councils to
retain or expand their
membership? 
What services or benefits would
justify future membership fees? 
What is the minimum viable
membership level for each delivery
option? 
Are different membership
categories required in future? 
Value for
Money and
Benefits
What tangible benefits have
participating councils received
during the last three years? 
What evidence demonstrates
return on investment from
membership fees? 
Which activities create the highest
value for members? 
Are there activities which no longer
justify the resources required to
support them? 
How could benefits and outcomes
be measured in future? 
Lead
Authority
Consideration
Does the current work being
undertaken by Councils and the
Lead Council remain
proportionate? 
82

Page 83

What functions must continue to be
delivered by a lead authority (and
is one needed)? 
Could those functions be shared
amongst members? 
What risks does SLC (or other
councils) carry under the current
arrangements? 
What level of resource would be
required from SLC (or other
Council) under each future option?
Digital and
Modernisation
Which activities can be delivered
more effectively through digital
collaboration? 
What opportunities exist through
Microsoft Teams, AI, shared
resources and virtual
communities? 
Can learning content be shared
without requiring formal
governance structures? 
What technological barriers
currently prevent greater
collaboration? 
Governance
and
accountability
Who currently leads the sub-group
and how are decisions made?
What are the current
responsibilities of the chair,
members, South Lanarkshire
Council and any other council or
partner?
Where are decisions, actions and
records currently held and
reported? 
Financial
viability
If the sub-group or other model
continues, what future funding
would be required and who would
contribute?
Who would oversee and manage
future budgets, payments, 
83

Page 84

invoicing, procurement and
financial reporting?
How can any future model be
affordable and sustainable beyond
2026/2027?
Legal and
compliance
requirements
What legal, governance or
compliance arrangements now?
Who is currently responsible for
data protection, procurement,
insurance, employment and
equality duties?
What policies, procedures,
contracts or agreements are
currently relied on?
Who would be responsible for
future compliance, advice,
approvals and audit requirements? 
Risk
management
What risks or issues exist under
the current arrangements?
What controls, mitigations or
escalation routes are currently in
place? 
Any other
comments   
84