Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 8 February 2023
Back to Oban Lorn & the Isles Area Community Planning Group — 8 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
1 February 2023 
NOTICE OF MEETING 
A meeting of the OBAN LORN & THE ISLES AREA COMMUNITY PLANNING GROUP will be
held by TEAMS on WEDNESDAY, 8 FEBRUARY 2023 at 6:30 PM, which you are requested to
attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. WELCOME AND APOLOGIES 
2. DECLARATIONS OF INTEREST 
3. MINUTES (Pages 5 - 14)  
Oban Lorn and the Isles Area Community Planning Group Minutes of meeting 9
November 2022. 
4. GOVERNANCE 
(a) Area Community Planning Group Governance Arrangements (Pages 15 -
26) 
Report by Committee Manager, Argyll and Bute Council 
(b) Appointment of Chair to the Oban, Lorn and the Isles Area Community
Planning Group (Pages 27 - 28) 
Report by Committee Manager, Argyll and Bute Council 
5. PARTNER UPDATE 
Public Document Pack

Page 2

(a) Scottish Fire & Rescue (Pages 29 - 34) 
(b) Police Scotland (Pages 35 - 38) 
(c) Public Health (Pages 39 - 42) 
(d) Living Well Network (Pages 43 - 44) 
(e) Community Learning Services - Live Argyll (Pages 45 - 46) 
(f) Oban Community Harbour Development Association (Pages 47 - 48) 
(g) Department of Works and Pensions (Pages 49 - 56) 
(h) Argyll & Bute Citizens Advice Bureau (Pages 57 - 58) 
(i) Community Contacts - Carr Gomm (Pages 59 - 60) 
(j) North Argyll Carers Centre (Pages 61 - 62) 
(k) Argyll and Bute TSI (Pages 63 - 66) 
(l) Opportunity for verbal updates by Community Planning Partners 
6. CLIMATE CHANGE 
(a) Report by Chair of Climate Change Working Group (Pages 67 - 68) 
(b) Home Energy Efficiency 
Presentation by Jackie Westerman, Project Officer of Home Energy
Efficiency Project (HEEPs) 
(c) ALIenergy 
Presentation by Dr Lynda Mitchell, Manager ALIenergy 
(d) Forestry and  Land Scotland 
Presentation by Robbie Layden 
7. COMMUNITY FOCUS 
(a) Sustaining Choices - Active Travel Plan Oban (Pages 69 - 100) 
Report by Isla McCulloch, Sustaining Choices 
8. COMMUNITY PLANNING PARTNERSHIP MANAGEMENT COMMITTEE UPDATE
(Pages 101 - 104)  
Report by Committee Manager 
9. DATE OF NEXT MEETING - 10 MAY 2023 
Oban Lorn & the Isles Community Planning Group

Page 3

Kevin Champion (Chair) Ryan MacIntyre (Vice Chair)   
Contact: Stuart Mclean, Committee Manager - 01436 658717     
Karen Campbell, Senior Committee Assistant – 01631 567855

Page 4

This page is intentionally left blank

Page 5

MINUTES of MEETING of OBAN LORN & THE ISLES COMMUNITY PLANNING GROUP held
by MICROSOFT TEAMS 
on WEDNESDAY, 9 NOVEMBER 2022 
Present: Kevin Champion  (Chair)
Councillor Kieron Green, Argyll and Bute Council
Joan Best, Crossroads
Jen Broadhurst, Citizens Advice Bureau
Laura Corbe, Climate Change
Samantha Campbell, NHS
PC Laura Evans, Police Scotland
Carol Flett, Living Well Network (Islands)
Rhona Grant, Community Learning Development, Live Argyll
Mairi Harrower, Oban and District Access Panel
Becky Hothersall, Community Development Argyll and Bute Council
Robert Kincaid, Oban Community Harbour Development Association
Marri Malloy, Oban Community Council 
Duncan Martin, Oban Community Council
Michelle Mundie, Chief Executive Argyll Housing Community Association Ltd
Petra Pearce, Third Sector Interface
Marie Stonehouse, Scottish Communities Climate Action Network 
Robert Taylor, Scottish Fire and Rescue
Lauren Worrell, National Farmers Union     
Attending: Jim Tolmie, Oban and District Access Panel
Aideen Shields, Isle of Kerrera Development Trust
Jane Metcalf, Isle of Kerrera Development Trust
Emma Sutcliffe, Dunollie Museum and Garden Grounds
Laura Bennitt, Time for Change Argyll and Bute
Robert Beauchamp, CEBR 
1. WELCOME AND APOLOGIES 
The Chair welcomed everyone and outlined the procedure for the meeting. 
Apologies for absence were intimated on behalf of: 
Iain Hutchison, Police Scotland;
Fergus Murray, Argyll and Bute Council;
Emma Clark, Wild About Argyll; 
Dr Lynda Mitchell, ALIenergy;
Susan MacRae, Skills Development Scotland;
Ali Martin, MECCOP;
Seonaid Cameron, Argyll Housing Community Association Ltd;
Gordon Boyle, Scottish Fire and Rescue; 
Theresa Bain, University of Highland and Islands, Argyll; and
Judith Hawcroft, North Argyll Carers
Catriona Petit, New Hope Kitchen 
Page 5 Agenda Item 3

Page 6

2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
(a) Oban, Lorn and the Isles Area Community Planning Group 17
August 2022 
The minutes of the Oban, Lorn and the Isles Area Community Planning
Group meeting held on Wednesday, 17 August 2022 were approved as a
correct record. 
4. OBAN, LORN AND THE ISLES AREA COMMUNITY PLANNING GROUP -
GOVERNANCE 
The group gave consideration to a report which sought the appointment of Ryan
MacIntyre, Member of the Scottish Youth Parliament, (MYSP) to its membership and
the appointment to the position of Vice-Chair for the Oban, Lorn & The Isles Area
Community Planning Group.   
Decision 
The Oban, Lorn and the Isles Area Community Planning Group: 
1. agreed to include Ryan MacIntyre MSYP to the membership of the Group;
2. noted that the membership in its entirety, and the Terms of Reference
would be considered at the next meeting; and
3. appointed Ryan Macintyre MSYP as Vice Chair. 
The Group agreed to a variation in the order of business to facilitate partner
attendance, these minutes reflect the order that items were considered. 
5. COMMUNITY FOCUS 
Update from Isle of Kerrera Development Trust 
Aideen Shields gave a presentation on the projects that the Isle of Kerrera
Development Trust are involved with. Aideen advised that the Development Trust
have made tremendous progress with key projects recently with Islanders being
delighted at the completion of the north/south road, which enables residents to safely
access the lifeline ferry. 
Aideen advised that a funding package has recently been secured to commence on
the final phase of renovation to the Old School, due to open as a community hub in
summer 2023. The Development Trust are aspiring to undertake further projects
such as: 
 Council adopted road improvements.
Page 6

Page 7

 Road adoption of the new north/south road.
 Bigger ferry with more capacity for people/vehicles.
 Improved ferry timetable.
 Introduction of a functional bus service that links to the ferry timetable.
 Improved car parking and road safety at Gallanach ferry terminal.
 Successful and sustainable operational community facility at the Old School.
 Enhanced visitor experience- toilets, heritage exhibition, ebike hire.
 Programme of community activities. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group commended the
work being undertaken by the Isle of Kerrera Development Trust and noted the
information provided. 
6. PARTNERS UPDATE 
(a) Scottish Fire and Rescue Update 
The Group considered a report highlighting the Scottish Fire and Rescue
Service’s (SFRS) FQ2 review of local performance across Oban, Lorn and
the Isles for the period 2022-23. The report included information on the
local firefighter training plan, incidents during this time period and recent
community engagement activities.  It has also been a busy period with
bonfires and fireworks, advice has been given to local communities and
schools. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Scottish Fire and Rescue, submitted) 
(b) Third Sector Interface - Argyll and Bute Community Directory 
The group gave consideration to a written update which has been
provided by 
Petra Pearce of Argyll Third Sector Interface. 
Decision 
The Oban, Lorn and the Isles Area Community Planning
Group considered and noted the information provided. 
(Reference: Report by Argyll TSI, submitted)
Page 7

Page 8

(c) Argyll & Bute Health and Social Care Partnership Update 
The Group considered a public health update from Samantha Campbell,
Argyll and Bute Health and Social Care Partnership. The update
highlighted information on the Public Health Team Annual Report for
2021-22 and the Mid Strategy Living Well Report for 2019-21. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Health Improvement Lead, Argyll and Bute Health
and Social Care Partnership, submitted) 
(d) Oban Access Panel - Braille labelling statutorily introduced onto
foodstuffs 
Jim Tolmie introduced the campaign of getting basic braille onto the labels
of foodstuffs on behalf of the Oban and District Access Panel. Jim advised
that a flyer has been produced to highlight the campaign and that they
have been working with Disability Quality Scotland and Sight Scotland.
While support has been given by Holyrood to this initiative the labelling of
foodstuffs must go to the Food Standards Agency in Aberdeen for
agreement. 
Marie Harrower explained to the group how difficult it is for poor sighted
and non-sighted people to access the correct foodstuffs.  Although most
items have a QR Code they can be difficult to find and you also need
equipment, where it would be easier if braille was added to the label of
foodstuff.  Marie advised that a national supermarket has already added
braille to their own brand products which is excellent,  the campaign has
moved quickly over the past year and the more people that are aware of it
the better. 
Decision 
The Oban, Lorn and the Isles Group noted, considered and commended
the update. 
(Reference, Promotional Flyer presented by Oban Access Panel,
submitted) 
(e) Oban Community Harbour Development Association (OCHDA) 
Robert Kincaid gave a brief update on the work being undertaken by the
Oban Community Harbour Development Association. Robert advised that
Page 8

Page 9

the Council were soon to submit a second Draft of the Harbour Order to
the Scottish Government for consideration and that the Management
Group still has issues concerning the consultation that had been
undertaken.   
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted and
considered the update. 
(Reference: Report by Oban Community Harbour Development
Association, submitted) 
(f) Islands Living Well Network Update  (Mull and Iona, Tiree, Coll and
Colonsay) 
The Group considered an update from the Islands Living Well Network
presented by Carol Flett. Carol advised that Kirsty McLuckie was leaving
her post at the Oban Youth Café and her role as the Coordinator for Oban
and Lorn Living Well Network and that she would be covering the Oban
area for the time being. Carol advised that the Network had taken out
adverts in local newspapers advertising their services.   
Decision 
The Oban, Lorn and the Isles Group considered and noted the report. 
(Reference. Report by Islands Living Well Network, submitted) 
(g) Argyll and Bute Citizens Advice Bureau Update 
Jen Broadhurst advised that the Citizens Advice Bureau Volunteer
Adviser Training Programme recommenced in September, and they now
have 5 new volunteers progressing well at this time, these trainees will
start to provide advice in the spring once they have completed their
training. The CAB have secured extra funding to support households
across the area to access energy advice.  Individuals can now access
advice and support with the Money Talk Team through a dedicated
website www.moneytalkteam.org.uk where they can look at options of
how to maximize their household income. The date of the AGM has
changed to 9th December at the Helensburgh Community Hub. 
Decision 
The Oban, Lorn and the Isles Group considered and noted the report. 
(Reference: Report by Argyll and Bute Citizen Advice Bureau, submitted) 
(h) Police Scotland Update 
PC Laura Evans had technical difficulties so was unable to give an
overview of the written report which she had submitted.  The report within
Page 9

Page 10

the agenda pack highlights the Dementia Safeguarding Tag, which is due
to be launched in November 2022 with support from Alzheimer Scotland. 
The aim of the project is to provide everyone living with Dementia a
Safeguarding Tag, which is a small discreet device that can be attached
to a bag or in a purse.  The Tag can be tapped against any smartphone,
which will then flag up the name of the person and who to contact if they
are in need of assistance. Promotional flyers, information of how to get a
tag and liaising with local shops and supermarkets will be cascaded in
due course. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the information provided. 
(Reference: Report by Police Scotland, submitted) 
(i) Department of Work and Pensions (DWP) Update 
The group gave consideration to a written update which was provided by
the Department of Work and Pensions. 
Decision 
The Oban, Lorn and the Isles Area Community Planning
Group considered and noted the information provided. 
(Reference: Report by Department of Work and Pensions, submitted) 
(j) Opportunity for verbal updates by Community Planning Partners 
Crossroads Argyll Update 
Joan Best gave a verbal update advising that Crossroads are now
supporting 67 unpaid carers, which include 4 on Seil, 8 on Mull and 1 in
Appin, with referrals rising exponentially.  Crossroads have now moved
into their new office in Gibralter Street, Oban with the official opening date
set for the 25th November on their 20th Anniversary. 
Live Argyll Community Learning Update 
Rhona Grant advised that Brian Smith was no longer working with Youth
Services and that a recruitment exercise was currently underway to fill this
post.  Rhona reported that the service has been busy with Adult Learning
events moving from a Monday to a Thursday within the Oban Library with
taster sessions taking place offering a selection of craft classes.   
7. CLIMATE CHANGE 
Page 10

Page 11

(a) CPP Climate Change Working Group Highlight Report 
Consideration was given to a report which highlighted the ongoing work of
the Climate Change Working Group. The report outlined the proposal to
produce a strategic Action Plan as a means to address the climate
emergency in Argyll and Bute; the development of governance
arrangements and structures to support the Climate Change Project
Officer post. Information was also provided on the funding options for the
project. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the update.   
(Reference: Report by Stan Phillips, Chair of the Climate Change Working
Group, submitted) 
(b) Argyll and Bute Regional Engagement Co-ordinator for Scottish
Communities Climate Action Network 
Marie advised that the Scottish Communities Climate Action Network
(SCANN) is a volunteer-led network with membership open to any
community group across Scotland that is taking action on the climate
crisis and to any organisation that is involved with or supports such
community-led action. 
Marie added that funding has been secured for the next 10 years to
develop networks and a Community Hub that will facilitate
community groups coming together to share experiences to tackle
climate change. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the update.   
(c) Time for Change 
The Group considered an update by Laura Bennitt from Time for Change
Argyll and Bute. Laura advised that Time for Change is a group of
residents who are campaigning to raise awareness of climate change. 
Laura highlighted that as a group they are increasingly concerned with the
need to build resilience in all areas and communities in Argyll and Bute.
They are working with civil contingencies to identify areas and organise
reliance plans.  Robert from Scottish Fire and Rescue advised that the
Fire Service could assist with the resilience plans. 
Laura added that recently the some of the elected members of the Council
had undertaken Climate Change Literacy training. 
Training is available online on 23rd/24th November and 1st /2nd /7th  and 8th
Page 11

Page 12

December.  Anyone interested should contact Jamie.joyce@act-now.com 
Decision 
The Oban, Lorn and the Isles Area Planning Group noted and considered
the information provided. 
(Reference: report by Time for Change Argyll and Bute, submitted) 
8. UPDATE FROM ARGYLL COMMUNITY HOUSING ASSOCIATION 
Michelle Mundie introduced herself as ACHA’s new chief executive and provided a
verbal update highlighting some of the recent work.  It was noted that ACHA had
held their AGM in September where ACHA tenant Cathy Grant of Glendaruel was
elected as Chair of the Association.  Employee Lachlan Woods had attended the
National Awards where he received the award Energy Champion of the Year, an
award that covered the whole of the UK. 
ACHA’s investment in new housing stock saw 10 new units at Inveraray in June
2022, 4 units at Tarbert to be signed off in December,  2 new units at Millknowe
which are dementia friendly to be signed off on 4th November.  New developments
will be coming on stream including at Dalintober and Port Ellen. 
A rent consultation is about to commence and all tenants will be written to. 
Decision 
The Oban, Lorn and the Isles Group considered and noted the report. 
(Reference: Presentation by, Michelle Mundie, Chief Executive of ACHA submitted) 
9. CBER - THE SOCIO-ECONOMIC IMPACT OF CALMAC FERRY SERVICES -
PHASE 2 REPORT 
The Group considered a presentation by Robert Beachaump. It was highlighted that
the Phase 2 report was a quantitative analysis of the impacts of CalMac as a
company (employment, Gross Value Added, turnover, and employee compensation
supported directly and through the supply chain), and of impacts of service levels on
island communities (ferry users’ welfare, economic activity, employment, population),
based on Phase 1 findings, desk research, analysis, fieldwork and socio-economic
modelling.. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group considered and
noted the information provided. 
(Reference: Report by Robert Beauchamp, submitted) 
Page 12

Page 13

10. COMMUNITY FOCUS 
(a) Dunollie Museum Castle Grounds Update 
The Group received an update from Emma Sutcliffe on the progress of
Dunollie Museum and Castle Grounds, highlighting that over 16,000
people had visited since April 2022, some of these visitors were able to
access the first floor of Dunollie Castle following ongoing restoration
works.  Phase 1 of a project to install a handrail along the Dunollie Castle
Path to assist visitors in climbing the steep path was recently been
completed. 
Emma highlighted the social impact the museum has had as well as some
of the groups on offer, such as the New Routes Health and Wellbeing
Group, Threads and Yarns Group and the Gaelic Language sessions
which are delivered online and in partnership with the Furan Gaelic
Centre. 
Decision 
The Oban, Lorn and the Isles Group considered, noted and commended
the report. 
(Reference: Report by Emma Sutcliffe, Dunollie Museum Castle Grounds,
submitted) 
11. MANAGEMENT COMMITTEE UPDATE 
Consideration was given to a briefing note which provided information on matters
discussed during a meeting of the Community Planning Partnership (CPP)
Management Committee, held on 6 October 2022. 
Stuart McLean spoke to the report and highlighted updates on topics including the
Cost of Living Crisis, The Child Poverty Action Plan and the CPP Annual Report. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group considered and
noted the report. 
(Reference: Report by Shona Barton, Governance Manager, submitted) 
12. DATE OF NEXT MEETING - 8 FEBRUARY 2023 
The Chair thanked everyone in attendance at the meeting, and thanked all partners
for their continued proactive work in the community. 
The Group noted that the next meeting of the Oban, Lorn and the Isles Area
Community Planning Group would take place on Wednesday, 8 February 2023 at
10am. 
Page 13

Page 14

This page is intentionally left blank

Page 15

Argyll and Bute Community Planning
Partnership 
Oban Lorn & The Isles Area Community
Planning Group 
08 February 2023 
Area Community Planning Group Governance Arrangements 
Summary 
The report asks the Oban Lorn and the Isles Area Community Planning
Group to review the current Terms of Reference, the membership of the
Group and also asks members to note the dates for meeting up until May
2024. 
1. Purpose 
1.1 The purpose of this report is to confirm the governance
arrangements of the Oban Lorn and the Isles Area Community
Planning Group (Area CPG) specifically the Terms of Reference,
membership and note future meeting dates. 
2. Recommendations   
2.1  Area CPG members are requested to:  
 Consider and adopt the Terms of Reference submitted in this
report (Appendix 1) and to agree that these be reviewed on an
annual basis to ensure their ongoing currency and
appropriateness for the work of the Area CPG as it develops
over time. 
 Consider and agree the membership of the group as attached
(Appendix 2) and to agree that the membership of the group be
reviewed on an annual basis to ensure currency and
appropriateness for the work of the group as it develops over
time. 
 To note the future meeting dates submitted in this report. 
3.        Detail 
Page 15 Agenda Item 4a

Page 16

3.1 The Area CPG Terms of Reference were last reviewed and agreed
in February 2022. An updated version, which has been amended to
reflect some changes in language and terminology, is attached at
Appendix 1. 
3.2 The membership of the Area CPG was last reviewed in February
2022. The Area CPG are asked to consider whether any changes
should be made to the membership, details of which are attached at
Appendix 2. 
3.3 The membership will be reviewed on an annual basis to ensure
currency and appropriateness for the work of the group as it
develops over time, however there is provision for additional
organisations to join the group at any stage to accommodate local
circumstances. 
3.4 Historically meeting dates for Area Community Planning Groups are
scheduled approximately half way between the programmed
meetings of the Community Planning Partnership Management
Committees to enable effective and timeous reporting of matters to
that committee. Members are therefore asked to note that the
meeting dates for the Oban Lorn and the Isles Area CPG for 2023/24
will be:- 
 Wednesday 10 May 2023
 Wednesday 16 August 2023
 Wednesday 8 November 2023
 Wednesday 7 February 2024
 Wednesday 8 May 2024 
4. Conclusion 
4.1 Given the development of Local Action Plans and the future focus of
the work of Area Community Planning Groups the meeting is asked
to review and agree the attached Terms of Reference and the
current membership. 
5.  SOA Outcomes 
Not applicable. The report relates to the administration of the Area CPG. 
For further information please contact:  
Stuart McLean, Committee Manager, Argyll and Bute Council
Tel 01436 658 717 
Appendix 1 – Terms of Reference
Appendix 2 – Membership list 
Page 16

Page 17

Terms of Reference Version 1.7 February 23 Page 1 
Argyll and Bute Community Planning Partnership 
Terms of Reference: Oban, Lorn & the Isles Area Community Planning Group 
The Oban, Lorn & the Isles Area Community Planning Group is a sub group of, and report to, the Argyll
and Bute Community Planning Partnership’s Management Committee. 
It is an unincorporated partnership of agencies and organisations with membership drawn from the
public sector, third sector, private sector, community organisations and partnerships that have an
interest in Oban, Lorn & the Isles. 
Purpose 
Argyll & Bute is a large and diverse area.  Communities inevitably have different issues even within the
overall umbrella of a community plan for the whole area. 
Area Community Planning Groups are the vehicle to ensure that there is effective community planning
delivery, as set out in the Community Empowerment (Scotland) Act 2015, at a local level by: 
 Contributing to the oversight role of the whole partnership by highlighting issues of a
partnership nature that cannot be resolved locally through the Area Community Planning
Group, to the Community Planning Partnership Management Committee. 
 Acting on behalf of the Community Planning Partnership via its Management Committee to
oversee the implementation of Community Planning Action Plans (known as ‘locality plans’
within the Community Empowerment (Scotland) Act 2015). 
 Acting on behalf of the community to ensure that local concerns and priorities are highlighted
to the Community Planning Partnership’s Management Committee. 
Role 
The role of the Oban, Lorn & the Isles Area Community Planning Group is to: 
• Oversee the development and implementation of the Community Planning Action Plan
for Oban, Lorn & the Isles
• Encourage effective working across community planning partners at an area level
• Act as a conduit to ensure that local priorities are met and local issues addressed
through partnership working 
Remit 
The Oban, Lorn & the Isles Area Community Planning Group has the authority to: 
• contribute to the development of a Community Planning Action Plan for Oban, Lorn &
the Isles.
• monitor progress  of the Community Planning Action Plan for Oban, Lorn & the Isles.
• provide the scrutiny role for the Community Planning Partnership within Oban, Lorn &
the Isles considering regular performance monitoring reports and providing information
Page 17

Page 18

Terms of Reference Version 1.7 February 23 Page 2 
to the Management Committee by submitting written reports on challenges that cannot
be resolved locally; where these challenges relate to partnership working and not single
agencies.  A representative of a community group or statutory body or business that is
not a member of the group may also attend a meeting with prior agreement from the
chair to provide additional information should a specific issue of concern to the group be
scheduled as an agenda item 
• form short term working groups to undertake defined pieces of work as required by the
group
• engage with communities within Oban, Lorn & the Isles to understand their needs and
consult on issues relating to Community Planning at an area level
• contribute to a Community Planning annual report for Argyll and Bute on progress on
the agreed outcomes and best practice in partnership working.
• 
Short Term Working Groups 
Short Term Working Groups initiated by the Oban, Lorn & the Isles Area Community Planning Group
must: 
 be approved at a meeting of the Oban, Lorn & the Isles Area Community Planning Group and
its purpose recorded in the minute of the meeting , with clarity on the objective and output
of the group and the start and end date of the work. 
 have a named member of the Oban, Lorn & the Isles Area Community Planning Group acting
as lead officer for the group
 have a list of members of the group agreed at inception
 have an appropriate source of administrative support identified and agreed at inception
 Where relevant have an appropriate funding package identified at inception and a named
member of the short term working group undertaking financial responsibility for the
initiative 
 provide regular reports of activity and progress  to the Oban, Lorn & the Isles Area
Community Planning Group; and in updates to the Management Committee
 any changes to the above must be approved by the Oban, Lorn & the Isles Area Community
Planning Group and recorded in the minute of the meeting 
Equal Opportunities & Fairer Scotland Duty 
The Oban, Lorn & the Isles Area Community Planning Group will ensure that equal opportunities are
considered in each of their remitted activities, any expected negative impacts are mitigated and 
promotion of equal opportunities is central to its on-going activities. 
In doing so The Bute and Cowal Area Community Planning Group will consider the responsibilities
placed on it by The Fairer Scotland Duty.  This duty places a legal responsibility on particular public
bodies in Scotland to pay due regard to (actively consider) how they can reduce inequalities of
outcome, caused by socio-economic disadvantage, when making strategic decisions. 
Criteria for Membership 
Page 18

Page 19

Terms of Reference Version 1.7 February 23 Page 3 
• Membership is drawn from public sector, third sector, private sector, community
organisations and partnerships operating within the Oban, Lorn & the Isles area.
• Membership is open to all organisations public sector, third sector, private sector,
community organisations and partnerships operating within the Oban, Lorn & the Isles
area with an interest in at least one of the outcomes identified in the Outcome
Improvement Plan.
• Organisations can self-nominate, be invited to join or have a statutory obligation to
participate. 
• In order to ensure democratic accountability, the Chair and Vice Chair from the Argyll &
Bute Council Oban, Lorn & the Isles Area Committee and one other Elected Member
from an Argyll & Bute Council Oban, Lorn & the Isles Area Committee Ward not already
represented by the Chair or Vice Chair will sit as members of the group. 
• In order to ensure democratic accountability, community councils situated with in the
Oban, Lorn & the Isles area will sit as a member of the group. Subject to local needs,
this may be individual community councils, or by way of a caucus arrangement agreed
by the community councils situated within the Oban, Lorn & the Isles area, or
alternatively one community council representing all of the community councils on a
rotational basis. The community council undertaking this role will be nominated by the
other community councils within the area on an annual basis or more frequently if
agreed locally.
• In order to comply with legislation which governs Community Planning in Scotland, some
organisations have a statutory obligation to participate in community planning. The
organisation will nominate the most appropriate person within their organisation to sit
as a member of the group where relevant.
• In order to reflect the needs of the community and range of activities covered by the Area
Community Planning Action Plan, other organisations and partnerships operating within
the local area are also able to sit as members of the group.
• In order to obtain a balanced representation of the above and to ensure a community
focussed approach, a ratio of no more than 50% public sector membership should be
maintained throughout the lifetime of the group. 
• The representatives ought to be able to speak on behalf of their organisation and where
appropriate commit funding and other resources to local partnership activity.
Membership should reflect the needs of the community and can therefore change
subject to approval by a simple majority vote of the other members of the group. 
Role of Members 
Oban, Lorn & the Isles Area Community Planning Group members have the following responsibilities: 
• To consistently attend the scheduled Oban, Lorn & the Isles Area Community Planning
Group meetings.
• Consistency in attendance by members is necessary to build momentum and progress
the activities of the group. 
• Appoint a substitute to attend meetings on their behalf if they are unable to attend. 
Page 19

Page 20

Terms of Reference Version 1.7 February 23 Page 4 
• To communicate information relating to the Oban, Lorn & the Isles Area Community
Planning Group with other members and officers within their own organisation and
other organisations operating within the area of activity they represent.
• To communicate information relating to their organisations area of activity to other
members of the Oban, Lorn & the Isles Area Community Planning Group at meetings.
• To raise community planning related issues (that is issues related to Argyll and Bute
Community Planning Partnership’s Local Outcome Improvement Plan) on behalf of the
community at Oban, Lorn & the Isles Area Community Planning Group meetings.
• To contribute to the development, on-going monitoring and review of the Oban, Lorn &
the Isles Area Community Planning Action Plan.
• To participate in short term working groups as required. 
Meetings 
Chair
• The Chair and Vice Chair of the Oban, Lorn & the Isles Area Community Planning Group
will be elected by the members of the group and will be appointed for a period of two
years.
• The outgoing Chair and Vice Chair can stand for re-election at the end of the two year
period. 
• However, no one person can serve in the role of Chair or Vice Chair for more than two
consecutive two year periods
• Should either the Chair or Vice Chair resign their position during their term of office, the 
office bearer must either notify the group in person at a scheduled Area CPG  meeting or
contact  the chair in writing  advising formally  of their intention to stand down.
Members will be advised of the resignation timeously and an election to fill the vacant
post will be conducted at the next scheduled Area CPG  meeting
• Nominations for the Chair and Vice Chair positions will be proposed and seconded by
Oban, Lorn & the Isles Area Community Planning Group members.  Each member will
have one vote and a simple majority vote will determine the outcome of the election
process.
• The elected Chair, or in their absence, the Vice-Chair shall preside over the meeting. If
both are absent, partners will choose a member from the floor to preside.
• Members should respect the authority of the Chair who will decide matters of order,
competency, relevancy and urgency. 
Quorum
• The quorum for a meeting will be 5.
• If a quorum is not present within 10 minutes of the scheduled start of a meeting or if at
any point after a meeting has commenced attendance falls below the quorum the
meeting will be declared inquorate.
• If a quorum is not present, at the Chairperson’s / Vice-Chairperson’s discretion, the
meeting shall proceed and any decisions taken will be homologated at the next meeting.
• For purposes of the quorum, participation of partners by video-conferencing or
telephone conference links will be considered as present. 
Frequency of Meetings
Page 20

Page 21

Terms of Reference Version 1.7 February 23 Page 5 
• The Area Community Planning Groups of the CPP will normally meet once each quarter
(4 times each year). 
• These meetings will normally be held in February, May, August and November. 
• Where business requires, further meetings can be called with agreement of the Chair
subject to the required notice being given. 
Conduct of Meetings
 Meetings of the Oban, Lorn & the Isles Area Community Planning Group will be held in
public. 
 Observers can only participate in discussion with the agreement of Chair.
 Members must declare any conflict of interests at the start of a meeting and take no part in
the consideration of the relevant item.
 Observers wishing to participate in discussion must declare any interest in the subject under
discussion.
 All meetings will be minuted and a minute made available through the Council’s website and
available from a link through the community planning partnership website.
 Meetings of the Area Community Planning Groups will be conducted in accordance with the
lead partner‘s (Argyll & Bute Council) standing orders for meetings subject to any necessary
changes as set out above (mutatis mutandis). 
Decision making 
• All members of the group have equal status 
• Each member has one vote 
• The Chair retains the casting vote
• All decisions must be clearly minuted with a brief summary of the discussion  and reason
for decision recorded as well  as the outcome
• The minutes should clearly record who or whatever organisation is responsible for
action
• Observers and persons attending the meeting  in an advisory capacity may provide
information but are not part of the decision making process and are not able to
participate in a vote
Accountability 
The Oban, Lorn & the Isles Area Community Planning Group is an integral part of Community
Planning in Argyll & Bute and is accountable to the following bodies: 
• Full Community Planning Partnership via the Management Committee 
• Community within its local area 
Support 
The Oban, Lorn & the Isles Area Community Planning Group will be supported by:
• A Lead Officer to facilitate and promote the smooth operation of the group and work
closely with group members to ensure a supportive structure, which responds to the
needs of the members in addressing issues.
• Administrative support, organising meetings, taking minutes and associated
administrative support will be provided by Argyll and Bute Council, Governance & Law.
Page 21

Page 22

Terms of Reference Version 1.7 February 23 Page 6 
• A Local Community Development Officer will have a key role, working in partnership
with organisations in the support of community groups, organisations and individuals,
particularly those who do not traditionally engage in community issues, to participate in
local community planning. 
Issue of Papers 
• The agenda and papers for the Oban, Lorn & the Isles Area Community Planning Group
will normally be issued 7 days prior to the date of the meeting. 
• The Chair can agree to accept late papers. 
• The draft Agenda detail will normally be circulated four weeks in advance to allow
members to propose items for inclusion 
• The agenda and papers will be published on the Argyll & Bute Community Planning
Partnership website, the Argyll & Bute Council website and available from a link through
the community planning partnership website. 
Communications 
The Oban, Lorn & the Isles Area Community Planning Group is encouraged to share any best
practice in partnership working locally with the wider Community Planning Partnership.  Case
studies and examples of partnership working making a difference can be sent to
cppadmin@argyll-bute.gov.uk to be shared and promoted. For example this may be through the
regular CPP e-Bulletin.  The CPP e-Bulletin is available to members of the Area Community
Planning Groups and sign up is via cppadmin@argyll-bute.gov.uk. Paper copies are available and
it is downloadable from the webpage. 
Winding Up 
The Oban, Lorn & the Isles Area Community Planning Group is a sub group of the Argyll and Bute
Community Planning Partnership.
 If the Argyll & Bute Community Partnership is dissolved, the Oban, Lorn & the Isles Area
Community Planning Group will cease to exist by default
 If a review of Argyll and Bute Community Planning Partnership delivery structure should
recommend that Area Community Planning Groups should be dissolved to facilitate a
new delivery structure, the decision whether or not to wind up the group will be made
by the Argyll & Bute Community Planning Partnership following consultation with the
Area Community Planning Groups and Argyll & Bute Council as lead partner for
community planning within the area.
 Area Community Planning Group members may initiate a proposed wind up of the group
by submitting a report outlining the reasons why it was felt the group was no longer
required to the Management Committee in the first instance. The decision whether or
not to wind up the group will be made by the Argyll & Bute Community Planning
Partnership following consultation  with Argyll & Bute Council as lead partner for
community planning within the area 
Approved and adopted at the Oban, Lorn & the Isles Area Community Planning Group meeting held
on 11 March 2015 
Amended March 2015 to reflect a change in the meeting cycle
Page 22

Page 23

Terms of Reference Version 1.7 February 23 Page 7 
Amended March 2016 to clarify procedure if either the Chair or Vice Chair resigns during their term
of office and amend number of days meeting papers are to be circulated prior to meeting date
Amended February 2017 to clarify procedure if outgoing office bearer wishes to stand for re-
election.
Amended February 2019 to clarify terms in respect of the Local Outcome Improvement Plan / Area
Community Planning Action Plan.
Amended February 2021 to clarify language and terminology and to include reference to Fairer
Scotland Duty.
Amended February 2022 to clarify language and terminology.
Amended February 2023 to clarify language and terminology. 
Page 23

Page 24

This page is intentionally left blank

Page 25

Appendix 2
Oban, Lorn and the Isles Area Community Planning Groups Membership 
Organisation Name
Argyll and Bute Council  Cllr A Kain
Cllr K Green
Cllr A Vennard
Community Councils Mull
Iona
Coll
Tiree
Oban
Glenorchy & Innishail
Taynuilt
Avich & Kilchrenan
Luing
Kilninver & Kilmelford
Seil & Easdale
Kilmore & Kilbride
Dunbeg
Lismore
Appin
Connel
Ardchattan
Police Scotland   Chief Inspector Simon Shanks
Inspector Ian Hutchison  
Sgt Chris Edwards  
PC Laura Evans 
Scottish Fire and Rescue  John Sweeney
Health & Social Care Partnership (OLI) Morven Gemmill
ACHA Michelle Mundie
West Highland Housing Association Leslie McInnes
Highlands & Islands Enterprise Catriona McKnight/Morag Goodfellow
Argyll and Bute Third Sector Interface Kirsteen  Murray/Katrina Sayer
Health & Wellbeing Network Kirsty McLuckie
BIDS4Oban Andrew Spence
Yvonne MacLean
Scottish Federation for Small Businesses Janet Waterworth
Argyll & Isles Strategic Tourism Partnership Carron Tobin 
Argyll College Maggie Melville (Developing the Young Workforce)
Cal Mac Blair Moglia
Development Coll 
Hope Kitchen 
Disability Forum & Access Panel Ken Johnson
Oban Tourism Linda Battison
Tiree Trust 
Crossroads Joan Best
North Argyll Carers Morag MacLean & Arlene Colewell
Oban Youth Forum Maureen Evans
Oban Youth Cafe Kirsty McLuckie
Oban Communities Trust/Rockfield Eleanor McKinnon
TSI Petra Pearce
Oban High School  Kevin Champion
Skills Development Scotland Susan MacRae 
OCHDA Robert Kincaid
Page 25

Page 26

Dunbeg Woodlands Group Laura Corbe
Member Scottish Youth Parliament Ryan MacIntyre
MECOPP Carers Centre Ali Martin
Carr Gomm Becs Barker & Sarah Chapman 
Page 26

Page 27

Argyll and Bute Community Planning
Partnership 
Oban Lorn & The Isles Area Community
Planning Group 
8 February 2022 
Appointment of Chair of the Oban Lorn & The Isles Area Community
Planning Group 
Summary 
The following report provides information relating to the appointment of a
Chair for the Oban Lorn & The Isles Community Planning Group.  It outlines
the expected time commitment and also gives information on the role.  The
Area Community Planning Group is asked to consider making an
appointment to the position of Chair. 
1. Purpose 
1.1 This report asks the Area Community Planning Group to consider the
appointment of a Chair. 
2. Recommendations 
2.1 The Area Community Planning Group is asked to consider the appointment of a
Chair. 
3. Background 
3.1  The current Chair, Kevin Champion, has been in post since February 2021. In
accordance with the Terms of Reference the Chair is elected for a period of 2
years. The Group is therefore required to nominate a member to take on the role
of Chair. 
4. Detail 
4.1 According to the Terms of Reference the Chair, if elected, would serve for a term
of 2 years with an option to be re-elected at the end of this time.  However, no
one person can serve for more than 2 consecutive terms.  
4.2 In order to be considered as a candidate for the position of Chair the person
must be a member of the Oban Lorn & The Isles Community Planning Group.  
4.3 Some further information on the commitment required:- 
 Attend meetings of the Oban Lorn & The Isles Community Planning
Group;
Page 27 Agenda Item 4b

Page 28

 Attend meetings of the Community Planning Partnership Management
Committee or the Full Partnership;
 Time commitment of at least 4 Community Planning Group meetings per
year in February, May, August and November and 4 pre-agenda meetings
per year in January, April, July and October;
 To participate in any Short-Term Working Groups as required; and
 To engage with officers of the Council in terms of setting the Agenda for
the CPG in consultation with the Vice-Chair. 
5. Conclusions 
5.1 The Area Community Planning Group is asked to consider the appointment of a
Chair.    
6. SOA Outcomes 
6.1 This report does not link to any specific Outcome as it relates to the
administrative arrangements. 
For further information please contact: 
Stuart McLean, Committee Manager (01436) 658717 
Page 28

Page 29

Oban, Lorn and the Isles
CPG Briefing Report 
Q3 2022/23
Performance & Activity Report 
From: 1st October 2022 To: 31st December 2022 
Page 29 Agenda Item 5a

Page 30

Introduction 
Welcome to the Scottish Fire and Rescue Service Community Board Performance
Report. This performance report is designed to provide citizens, stakeholders and
partners with information relating to Community Board based activity undertaken by
the Scottish Fire and Rescue Service. 
Whilst using historic statistical benchmarking data, consideration must be taken of
the somewhat random nature of fire related incidents and events, and how this can
pose difficulties in interpreting emerging patterns and trends. This is of specific
relevance where Community Board level data is analysed due to the relatively small
number of actual incidents/events that occur in Community Board areas. 
However, regardless of statistical anomalies, emerging patterns and trends in fire
related incidents and events can assist the Scottish Fire and Rescue Service and
Community Planning Partners plan and implement preventative intervention
initiatives to target reducing fire related incidents and events. 
Local Firefighter Training Plan
Below is a list of subjects the operational crews have been focusing on within this
period. Each subject has been covered both practically and theoretically and
recorded in the Fire Service Training recording system. 
Training
Subjects
October/November/December
 CFBT
 Tac Vent
 Casualty Care
 RTC and Extrication
 HAZMAT
 SWAH
Page 30

Page 31

Accidental Dwelling Fires (ADF) 
Ward 3 Year Average 2021/22 2022/23
Oban North & Lorn 1.7 2 3
Oban South & the Isles 4.3 2 3
Community Board Total 6 4 6 
ADF Casualties 
Ward 3 Year Average 2021/22 2022/23
Oban North & Lorn 0 0 0
Oban South & the Isles 0.7 0 0
Community Board Total 0.7 0 0 
Deliberate Secondary Fire Setting 
Ward 3 Year Average 2021/22 2022/23
Oban North & Lorn 0.3 1 0
Oban South & the Isles 0 0 0
Community Board Total 0.3 1 0 
Page 31

Page 32

Fires in Non-Domestic Property 
Ward 3 Year Average 2021/22 2022/23
Oban North & Lorn 0.3 0 1
Oban South & the Isles 1 3 0
Community Board Total 1.3 3 1 
Casualties from Non-Fire Emergencies 
Ward 3 Year Average 2021/22 2022/23
Oban North & Lorn 4 1 4
Oban South & the Isles 3 1 6
Community Board Total 7 2 10 
Unwanted Fire Alarm Signals 
Ward 3 Year Average 2021/22 2022/23
Oban North & Lorn 17.7 17 25
Oban South & the Isles 33.3 33 41
Community Board Total 51 50 66 
Page 32

Page 33

Incidents/Activities of Note                   
Unwanted Fire Alarm Signals (UFAS) 
We are still continually working with partners and targeting our top offenders which are Education including
Infant/Primary/Secondary Schools, and Residential/Care Homes. 
A new UFAS Policy has been devised by a dedicated project team within SFRS with an aim at reducing UFAS Incidents
further. Completion of this has been advised to be April 2023. 
Road & Water Safety campaigns 
We have been working alongside Police Scotland, RNLI and various other Partners across all sectors engaging with
the Local Community at various identified hotspots providing information, advice and literature relevant to Road &
Water Safety (including drug and alcohol misuse and ASB), as well as providing Throwline and CPR Training to local
businesses and members of the public. 
Community Engagement Activities 
• Post Domestic Incident Response (PDIR) following every domestic incident.     
• Fire, Water & Road Safety Talks –Presentations into schools and local community groups with practical
demonstrations and interactive scenario floorboards. 
• Continue to deliver Fire Safety advice via HFSVs and provision of smoke detection where none is fitted.     
• Represented on the MARAC for those affected by domestic Violence.     
• Continue to support “Make the Call” Campaign and “On Call” recruitment drive for retained and volunteer
stations.     
• Supporting PAWS group and engaging with the public, #RESPECTTHEWATER campaign.     
•Online training for partners with risk awareness within the training via MS Teams.     
• Engaging with communities for Bonfire/Autumn TAP safety advice; Bonfire/Fireworks Safety, firework
legislation, Anti-Social Behaviour and deliberate fire setting, refuse fires, outdoor fires, fly-tipping, wildfires.
 Bonfire & Fireworks Presentations delivered to all schools within the area using 3 pronged approach
depending on the schools capacity to accommodate in person, over MS teams, or to present themselves
with our support.
 SFRS Electric Vehicles within the Area
 Beehives within the area producing Honey.
 Victim support referral pathway set up 
Home Fire Safety 
As part of our commitment to building a safer Scotland we offer everyone in Scotland a free home fire safety visit.
We'll help you sort out a fire escape plan and provide information about smoke, heat and carbon monoxide
alarms. 
For a Free Home Fire Safety Visit, please: 
 call 0800 0731 999
 text "FIRE" to 80800 from your mobile phone. 
Twitter link: https://twitter.com/abewdhq 
Page 33

Page 34

Page 34

Page 35

OFFICIAL 
OFFICIAL
Communities & Partnerships Team 
Since the last meeting the Policing team framework within the MAKI and OLI region has become more cemented,
with a Communities & Partnerships Team set up to start developing its work in the local area. Currently, this consists
of Insp Lee Page, based in Oban, and Sgt Matt Shaw, based in Lochgilphead. Their focus is to service those ties
already present, building on the good work that has gone before, and to expand the partnership network to the
benefit of partners and the public that we serve. Whilst Sgt Matt Shaw, who has a background in Child Protection
and Serious Crime, has already been linking with this forum and has spoken before, Insp Lee Page comes from
Response Policing, working in the department for four months, having transferred in from West Mercia Police in
England, where he had a strong history in community policing and partnership working. Both look forward to helping
develop partnerships, programs and initiatives that will better serve the communities of this part of Argyll. 
Should any members of this forum feel that they have identified relations that need strengthening, have questions
for the Police or have programs/initiatives that they wish to discuss with Insp Page or Sgt Shaw, please, don’t
hesitate to contact them on: Lee.Page@scotland.police.uk and Matthew.Shaw@scotland.police.uk 
Community Council Framework 
On the back of the above development, the way that Community Councils within the OLI and MAKI areas are
engaged with has changed. There has been inconsistency with how Community Councils have been served across
this Policing area, with some having fixed representation, some having sporadic attendance, and some not having
any interaction whatsoever. Moving forward all Community Councils will receive the same service. Firstly, a report
will be generated each month which details the number of calls the Beat Area the Community Council lies within has
received. The top three demands for that Beat Area will also be detailed, along with any associated press releases, to
help provide some context. Within this document will also be any key messaging that the Police wish to pass to
communities. This document will help show the wider demand for Police Services for the area in which those
communities live.  
All the councils have been written to, advising of the new structure and seeking confirmation of points of contact
and meeting times/date. It will now be the case that the Duty Response Sgt will be informed of what meetings are
taking place when they are on duty. Where they can facilitate attendance through themselves, or another officer,
they will. However, with 36 Community Councils and only 1-2 Sergeants on duty at any given time, many
appointments are liable to clash and the demand being serviced from 999 calls will always have to take priority.
Should they be able to attend, they will have the same report as furnished to the councils already, but will be able to
answer any questions, provide further context if applicable or take away information/requests for further
development. 
Again, Insp Page and Sgt Shaw, are the points of contact for the Community Councils and will develop any work that
is required for or by them. 
Not At Home Protocol 
Argyll and West Dunbartonshire Police Division has been working with key partners in the local authority to develop
the Not At Home Protocol which launches locally on the 9th January 2023. 
Police Scotland and Partners recognise the importance of their roles as ‘Corporate Parents’ and are committed to
ensuring the wellbeing and support of care experienced young people.  We also recognise that care experienced
young people should be listened to and supported to prevent them being unnecessarily criminalised and from being
exposed to risk and harm.  Some children may be ‘not at home’ for a short period of time before
returning.  Sometimes children stay out longer than agreed, either on purpose or accidentally, and may be testing
Page 35 Agenda Item 5b

Page 36

OFFICIAL 
OFFICIAL
boundaries.  This kind of boundary testing is well within the range of normal teenage behaviour and is not
necessarily considered a risk. Police Scotland receive a number of calls relating to missing persons, often relating to
care experienced young people who have not returned home, however their whereabouts are known by their care
provider and they are believed to be safe and well. 
The Not At Home Protocol has the following aims: 
 To meet the needs of our care experienced children and young persons 
 To ensure a proportionate and risk assessed response to missing episodes 
 To reduce the likelihood of escalation of behaviour with unnecessary police contact  
Where there are good grounds to believe that a child’s absence is careless or deliberate, and there is no apparent
risk to the child and/or public it is permissible to have a single agency response and there is no need for the police to
be contacted.  If that risk becomes intolerable to the carer, consideration should be given to reporting the child
missing to Police Scotland, generating a multi-agency response.   
Local Authorities, care providers and Police all play a vital role in the prevention, response, support and protection of
children when they are missing.  It is recognised that looked after children who go missing from care homes are
particularly vulnerable as they can be targeted and may lack direct support or supervision from close family
members. 
Distress Brief Intervention 
Distress Brief Intervention (DBI) is an innovative way of supporting people in distress. The DBI approach emerged
from the Scottish Government’s work on Suicide Prevention and Mental Health strategies. The aim of the DBI
programme is to provide a framework for improved inter[1]agency working, collaboration and co-operation across a
wide range of care settings, interventions and community supports, working towards the shared goal of providing a
compassionate and effective response to people in distress. This makes it more likely that individuals in distress will
engage with and stay connected to services or support that may benefit them over time. Most importantly, DBI
provides the opportunity to do the right thing and help people get access to early and effective support at a time
when they need it most. Early and effective interventions by trained professionals go such a long way to improving a
person’s quality of life and those of their families, friends and the wider community. 
DBI affords police officers a further tactical option (not previously available) to consider when dealing with people
presenting in distress. It will not replace / duplicate any current arrangements for anyone who requires further
medical treatment and will complement existing local arrangements such as contact with the Emergency Crisis
Mental Health Team. Within Argyll and Bute, referrals for Distress Brief Intervention can be sent to Support In Mind
Scotland who provide follow up with the person in distress within 24 hours of the referral. Support in Mind Scotland
Page 36

Page 37

OFFICIAL 
OFFICIAL
are then able to offer up to 14 days of time limited support to the individual and can link in with the GP for
localised/further support. 
There are now over 50 police officers trained to make DBI referrals including officers on our islands including Mull,
Tiree, Islay and Rothesay ensuring this support is available regardless of where in Argyll and Bute you live. 
Rural Watch Scotland 
Scotland is renowned for its great natural beauty and the rural communities of Scotland are safe places in which to
live, work and visit. However, the nature of the environment and way of life means there are some crime prevention
tips particularly relevant to rural life. Police Scotland would like to encourage people within Argyll and Bute to get
involved with Rural Watch Scotland and to sign up and receive FREE alerts. 
'Rural Watch Scotland' is an extension of the Neighbourhood Watch Scotland movement and a product of the
Scottish Partnership Against Rural Crime (SPARC) aimed specifically at the rural community of Scotland and aims to
bring all the benefits of Neighbourhood Watch to your community irrespective of its location, size or
demographics.  The objectives of Rural Watch Scotland mirror that of Neighbourhood Watch, namely to: 
 Reduce crime and the fear of crime by providing the right information, to the right people, at the right time
 Encourage people to think about safety and security for themselves, their neighbours and their community
 Improve community cohesion and well-being by supporting communities to develop 'their watch, their way'
 Work in partnership with national and local service providers to develop more resilient communities that are
better prepared against threats, intentional or unintentional, such as crime or extreme weather 
By joining Rural Watch Scotland you can receive alerts and advice by phone, text or email. By keeping you informed
about crime and other threats in your area, we help prevent crime, keep your community and its residents safe, and
your response to these alerts can help us catch criminals or be better prepared to deal with other threats to your
community. To join Rural Watch Scotland simply click the green JOIN button at the top of the internet page found
here https://www.ruralwatchscotland.co.uk/#SignUp 
Page 37

Page 38

This page is intentionally left blank

Page 39

1 
Argyll & Bute Community Planning
Partnership 
Area Meetings
Date: January 2022 
Partner update – Public Health 
The paper provides an update on ongoing wellbeing and prevention activity
overseen and delivered by the HSCP Public Health Team in Argyll and Bute.
Living Well self-management grant funding 2022/2023
In November 2022 Argyll & Bute HSCP launched year 4 of the Living Well (Self-
Management) community capacity building fund, which was open to Third Sector
organisations who deliver services/support to adults over the age of 18 living in
Argyll and Bute.
Applications were invited from third sector organisations that can support the HSCP
to deliver on the Living Well Strategy. In 2022/2023, the fund was keen to attract
projects that had a particular focus on 
• Supporting volunteer wellbeing.
• Reducing isolation and improving community networks.
• Supporting healthy weight or access/cost around food via sustainable food
programmes in our communities.
The Living Well steering group is delighted to announce that the following groups will
receive grant funding from this programme: 
• Argyll and Bute Citizens Advice Bureau
• Hope Kitchen
• Argyll Wellbeing Hub
• Jean's Bothy
• Dochas Carers Centre
• eXp Dunoon
• Kintyre Link Club
Community Link Working
The Argyll and Bute Community Link Working service is commissioned by Argyll and
Bute HSCP and delivered by 3rd sector organisation We Are With You. Community
Link Workers can be accessed through referral from 14 GP practices across Argyll
and Bute.  The service addresses inequalities by being accessible to those living in
the areas of Argyll and Bute that experience the most socioeconomic deprivation. 
Page 39 Agenda Item 5c

Page 40

2 
Community Link Workers recognise that social issues such as debt, relationships,
employment and loneliness affect people’s health and wellbeing, and will connect
people to sources of support or resources within their community. The service has
been developed in line with the modernisation and expansion of services delivered in
GP practices, resulting in multidisciplinary teams working together to support people
holistically and improve outcomes for patients.   
The Community Link Working service continues to receive positive feedback and an
increasing number of referrals. Over the first 6 months of the service, 240 referrals
were received, with 85% of people who completed wellbeing scale at Entry and Exit
reported increased well-being scores. The CLWs use a variety of approaches to
support people to make changes to their health and wellbeing.  This may include
signposting, sharing information, referral, or direct support with self-management
techniques such as relaxation strategies. 98% of those who completed a satisfaction
survey strongly agreed/agreed that they had received the right support from the link
worker. 
“My link worker has been an absolute huge support to me when I needed. I don’t
know how I would have coped without her.”
“I definitely feel that having the link worker support me and help me find the correct
resources has made a huge difference and achieved so much. I am very grateful for
the time, effort and compassion that was shown to me and I feel like a lot of people
would really benefit from the same experience I had.”
Further information can be found at: https://www.wearewithyou.org.uk/what-we-
do/community-links/ or via email at argyllandbutecommunitylinks@wearewithyou.org.uk 
Health Improvement website
The Argyll and Bute Health Improvement team has launched a new website with
information about the Living Well strategy and the wider health improvement work. 
The website can be accessed via: https://www.ablivingwell.org/.
The website contains information about the work of the Living Well Networks. The
Living Well Networks (LWNs) are for people with an interest in building healthy
communities. They provide an opportunity for people to come together to find out
what issues matter to local communities; to plan activities and events together; and
to network with individuals, services and organisations with an interest in improving
health. The networks have allocated co-ordination time funded by the Argyll and
Bute HSCP.
The website also has information about health improvement work relating to Type 2
Diabetes, self-management, emotional/mental wellbeing, suicide prevention, and
smoking cessation.
Resources such as such as Public Health Annual Reports and electronic versions of
leaflets can be found here: https://www.ablivingwell.org/resources-publications.  This
includes the updated Small Changes Big Differences leaflet, which contains useful
self-management information for a range of health behaviours, including where to
Page 40

Page 41

3 
find further support https://www.ablivingwell.org/s/small-changes-big-difference-
booklet_updated-Aug-22.pdf 
Screening 
The Argyll and Bute Health Improvement Team have been raising awareness about
the importance of health screening, particularly Bowel and Cervical. Since November
2022, outreach work with many community and third sector organisations has been
ongoing, to raise awareness and have access to accurate information. The team
plan to deliver training on how to raise the issue of health screening for community-
based organisations and offer further support. 
In addition to the community work, The Smoke Free Advisers will also start to
introduce health screening, where appropriate, when offering their smoking
cessation service. Encouraging the conversation of health screening can reduce
misconceptions, provide accurate information, and reduce fears and anxieties.    
Bowel screening is done to help find cancer early, when it can be cured. In Scotland,
people aged 50 to 74 will be invited for bowel screening every 2 years. If you’re 75 or
over, you can still take a bowel screening test every 2 years. However, you’ll need to
request a new test kit each time as the Scottish Bowel Screening Centre won't
routinely send you one, ordering a new kit can be done on
https://www.nhsinform.scot/healthy-living/screening/bowel/request-a-bowel-
screening-test-kit/ 
Cervical screening is routinely offered to anyone with a cervix in Scotland between
the ages of 25 and 64 is usually every 5 years. Testing for HPV is an effective way of
identifying those at risk of developing cervical cancer. More information can be found
on https://www.nhsinform.scot/healthy-living/screening/cervical/cervical-screening-
smear-test . 
In addition to this if anything seems unusual for you, or you have any signs or
symptoms that you are concerned about, the advice is to contact your GP to arrange
an appointment.  
Further information on all the NHS Screening Programmes can be found at NHS
Inform  Screening | NHS inform
Screening information for the transgender / non binary community can be found at
Transgender screening in Scotland | NHS inform
REPORT AUTHOR AND CONTACT
Author Names: Sam Campbell, (Interim Health Improvement Principal); Laura
Stephenson and Jenny Dryden (Health Improvement Leads)
Email    nhsh.abhealthimprovement@nhs.scot 
Page 41

Page 42

This page is intentionally left blank

Page 43

Oban and Lorn Living Well Network                                                                                                                    
Islands Living Well Network (Mull and Iona, Tiree, Coll and Colonsay)               
18/01/2023  
Date of next meetings   
The next Oban and Lorn Living Well Network Meeting will be on Thursday 16th February from 10am
till no later than 12noon.                                                                                                                                            
The next Islands Living Well Network Meeting will be on Thursday 23rd February from 2pm till no
later than 4pm.
Both meetings will be a chance for members to share information, network and find any common
ground for joint working.  
Mandy Sheridan will be speaking at both meetings. She will have information about the
Implementation of the United Nations Convention on the Rights of the Child and also information
about training being run by the Violence against Women and Girls Partnership, particularly the roll
out of Safe and Together. 
Both meetings will be on Zoom, please contact tcmhwn@gmail.com if you would like to attend
either or both meetings. 
Carol Flett
Living Well Network Coordinator
07753218327     
Page 43 Agenda Item 5d

Page 44

This page is intentionally left blank

Page 45

Community Learning Services LiveArgyll Update 
After the Festive break Community Learning Services activities have resumed  and in
addition to existing activities ongoing there are new initiatives underway and up and
coming. 
There has been a change in remits Maureen Evans is the Lead Worker for youth Work and
Scott Douglas is the Lead Worker for Adult Learning.
For further information on what activities are currently running and what is in the pipeline
please contact Maureen and Scott directly.
MSYPs are running consultations events across Argyll with young people around their right
to vote and how to vote.  During this event they will also be supporting the Community
Planning Partnership in promoting and encouraging more Young People to complete the
recent Improving Lives in Argyll Survey if they haven’t already done so. 
Adult Learning 
Due to the success of  the taster sessions  in October 2022 further  taster sessions were held
in December offering some short taster sessions in different craft activities for example
Quilling, Collaging and Boccia  and was promoted and  advertised through local
organisations (e.g. Hope Kitchen, Wellbeing Hub) as well as on social media
New Appointment of LiveArgyll Community Learning Services Youth Team Leader: Wendy
Reid has been appointed as the Youth Services Team Leader and will start in her new role in
February 2023. Wendy will start to introduce herself to Partners, Organisations when she
starts and we would like to welcome her on-board.   
Page 45 Agenda Item 5e

Page 46

This page is intentionally left blank

Page 47

Oban Community Harbour Development Association 
Argyll & Bute Council have submitted the Harbour Revision Order to Transport
Scotland on what they say is a preliminary basis; thus if there is anything not right
legally at first glance it will then come back to the Harbour Board. If it carries on in
the due process there will come a time when there is a public consultation period of
six weeks. Further stages will then process towards Argyll & Bute Council being the
authority for a greater area of harbour and the safety therein. CalMac continue to
have a nested area nearby there ferry pier facility.
OCHDA has been very supportive and have assisted in the Councils progress of this
matter over the last year, but it has not been easy. One sticking point is that the
governance of the port has little local influence built into it, no local advisory group
and stakeholders may just not be heard. OCHDA feel strongly that this is not
acceptable as Oban is a far more complex port than other small scale facilities that it
presently operates. In terms of vessel numbers and berthed/moored vessels within a
given area; it is substantially different.
Robert Kincaid OCHDA rep 25/1/23 
Page 47 Agenda Item 5f

Page 48

This page is intentionally left blank

Page 49

DWP Partner Update  January 2023
Count of customers – Universal Credit and Legacy benefits (Stats Xplore 19/01/23)
Universal Credit – Number of People on UC by Age  Group at  December 2022  (all conditionality groups)
Jobcentre Plus 18 – 24 25 – 39 40 – 49 50 – 59 60+ TOTAL
Campbeltown   99 353 196 156 105   909
Dunoon 150 464 261 230 116  1221
Helensburgh 151 486 247 201 109  1194
Oban 197 732 398 313 187  1827
Rothesay   68 253 178 154   86    739
TOTAL 665 2288 1280 1054 603 5890 
Universal Credit – Number of People on UC by Conditionality Group at December 2022
Jobcentre Plus C’town  Dunoon H’burgh Oban Rothesay TOTAL
Searching for work  172 304 202 377 168 1223
Working – with
requirements
149 174 176 260  83  842
Working – no
requirements
207 206 268 434 130 1245
No work related
Requirements
341 463 485 608 288 2185
Planning for work  10 13 12 18 15 68
Preparing for work  31 74 65 117 61 384
TOTAL  910 1234 1208 1814 745 5911
Page 49
Agenda Item
5g

Page 50

Jobseekers Allowance at May 2022 – Argyll & Bute 
Male 103 
Female   44
Total 147 
Employment & Support Allowance at May 2022 – Argyll & Bute
Phase of claim 
Assessment phase    88
Work Related Activity Group   293
Support Group 2163
Total 2544 
Income Support as at May 2022 – Argyll & Bute
Statistical Group 
Lone Parent   43
Carer 104
Total 147 
Update
DWP is providing targeted support for customers over 50 years of age, with each District now having a 50+ Champion who is working
with local sties.  This will enable those aged 50 and over, through early and targeted employment, skills and employer-led support to
stay in, progress or return to work and to build their future financial resilience and wellbeing.
DWP continue to seek provision for its customers to support them in their employability journey.  DWP has purchased Customer Service
provision for 6 customers in the Campbeltown area and the customers who participated in this provision have gained a range of
certification which will enhance their prospects of gaining employment in retail and hospitality sectors.  The course included certified
learning in Customer Service skills, Health & Safety at Work, Moving & Handling (Objects), Emergency First Aid and REHIS as well as
mock interviews.  
Page 50

Page 51

DWP purchased provision for 50 customers in West Scotland District which can be accessed by customers across Argyll & Bute and
following the success of this support, further provision has been purchased.  The aim of this provision is to progress customers who
are reporting a health customer on their customer journey.  The provision will support them to recognise and overcome barriers and to
adjust their mindset, acknowledge their health conditions and gain an understanding of how to manage their movement towards work. 
This provision will run from 6/2/22 to 22/4/23. 
Autumn Statement
The Chancellor delivered his Autumn Statement in November which included a targated package of support for the most vulnerable.
The full Autumn Statement is available to read on GOV.UK along with supporting documents including a Cost of Living factsheet
The package included:
Benefit Uprating – The Government is protecting the most vulnerable in society by increasing benefits in line with inflation by 10.1%.
Working age families will see their benefit payments rise from April 2023.  The Government is also providing support this winter for
people who need help now, including money off energy bills and Cost of Living Payments.
Pensions Uprating – Pensioners in Great Britain will benefit from a 10.1% increase to their State Pension in April 2023 under the triple
lock.  This is worth over £870 next year on average.  A full basic State Pension will increase from £141.85 to £156.20 per week, and
the new State Pension will increase from £151.85 to £203.85.  The Government will also protect 1.4 million of the poorest pensioner
households from rising prices by increasing Pension Credit by 10.1% in April 2023. 
New Cost of Living Payments – UK households on means-tested benefits will receive an additional Cost of Living Payment of £900
in 2023-24.  These will be made in more than one instalment.  People across the UK on non-mean tested benefits will receive a further
£150 Disability Cost of Living Payment in 2023-24 to help with the additional costs they face.  This is in addition to the Cost of Living
Payment for households on means-tested benefits and pensioner households, if eligible. 
Pensioner households across the UK will receive an additional £300 Pensioner Cost of Living Payment in 2023-24 to help with bills. 
This is in addition to means-tested and disability payments (if eligible) recognising that many pensioners are disproportionately impacted
by higher energy costs and unable to increase their income through work. 
Exact payment windows will be announced closer to the time, but are spread across a longer period to ensure a consistent support
offering throughout the year.  They will be broadly as follows:
Page 51

Page 52

£301 – First Cost of Living Payment – during Spring 2023
£150 – Disability Payment – during Summer 2023
£300 – Second Cost of Livig Payment – during Autumn2023
£300 – Pensioner Payment – during Winter 2023/24
£299 – Third Cost of Living Payment – during Spring 2024 
Guidance on getting extra payment to help with the cost of living if you’re entitled to certain benefits or tax credits has been updated to
include a link to information about Cost of Living Payments during 2023 and 2024.  https://www.gov.uk/guidance/cost-of-living-payment
Benefit Cap rise – In April 2023 the Government will also increase the benefit cap in line with inflation by 10.1%  The benefit cap will
rise from £23,000 to £25,323 for families in Greater London and from £20,000 to £22,020 for families nationally.  Lower caps for single
households without children will rise from £15,410 to £16,967 in Greater London and from £13,400 to £14,753 nationally.
Employment & Support Allowance (ESA) – delay in managed move to Universal Credit - The Government has also had to make
challenging decisions to deliver on fiscal sustainability while protecting support for those who need it most.  As part of this, the
Chancellor announced a delay in the moving of ESA claimants not in receipt of Child Tax Credit into UC until April 2028, this provides
a welfare saving of £1 billion by 2027-28, as overall UC is more generous that the benefits it replaces.  Completing the move to UC
over a longer time frame moves these increased costs to a later date. 
Recoverable Hardship Payments
From 19/12/22 claimants will be able to ask DWP to review a previous request to stop (waive) Recoverable Hardship Payment (RHP)
repayments made between 1/1/14 and 11/1/21. 
Recoverable Hardship Payments provide money to claimants who have seen their benefits reduced by sanctions or a fraud penalty. 
Claimants have to apply for them with evidence of need, and each request is reviewed individually.  Hardship payments must be
repaid by the claimant.  However, claimants can request for the recovery of these payments to be waived, and must provide further
evidence to show that paying back the money is either unaffordable or would affect their or their family’s health or wellbeing.  
Page 52

Page 53

And exercise has already started to look at previous waiver requests that took place prior to 11/1/21.  A guidance page on GOV.UK 
explains the process and asks claimants to share evidence if they feel their RHP should be waived.  Applications can only be
considered if a request was made to waive the RHP between 1/1/14 and 11/1/21 and was refused at the time.  With the evidence,
Debt Management will check the claimant’s circumstances to see if they would have qualified. 
Automatic Enrolment – employer workplace pension duties
Automatic enrolment is a continuous responsibility for all employers, from ensuring they maintain pensions contributions to
completing re-enrolment.  The Pensions Regulator (TPR) provides information for employers to help them prevent errors. 
We ask for your support in driving awareness of employers’ ongoing automatic enrolment duties. Further details on signing up to
receive updates from The Pensions Regulator can be found on the TPR website. 
Reversal of National Insurance increase
The reversal of April 2022’s 1.25% rise in National Insurance took effect across the UK from 6/11/22.  Most employees will start to
receive this tax cut directly through payroll between November 2022 and February 2023.  
Added to July’s increase in National Insurance thresholds, almost 30 million people will be £500 better off on average this year.  It
takes effects in all part of the UK and means working people will keep more of the money they earn. Funding for health and social
care services will be maintained at the same level as if the levy were in place. 
Made with Care campaign highlights opportunities for careers in care
The “Made with Care” campaign has returned for a second year and highlights the wide range of opportunities available to build a
career in care and help others to live happy, healthy, fulfilling lives.
Running until March 2023, campaign advertising will appear to millions across video-on-demand platforms such as ITV Hub, Sky Go
and All 4 as well as radio and digital audio channels such as Spotify and social media and digital channels like Facebook and
Instagram to direct jobseekers to www.adultsocialcare.co.uk  People will be able to find everything the need to research a career in
adult social care and, crucially, search and apply for adult social care jobs near them, with support to perfect their CV and advice on
interviews. 
Page 53

Page 54

Minimum Wage Increases
The National Living Wage will rise to £10.42 from 1/4/23, an increase of 92p or 9.7%.  The Low Pay Commission’s recommendations
ensure the NLW continues on track to reach the Government’s target of two-thirds of median earnings by 2024.  The
recommendations were unanimously agreed by Commissioners and accepted fully by the Government. Large minimum wage increases
help protect low-paid workers’ living standards - GOV.UK (www.gov.uk) 
Employers who have signed up to the Disbability Confident scheme
This document lists employers who have signed up to the Disability Confident scheme, and their status (committed, employer or
leader). Employers that have signed up to the Disability Confident scheme - GOV.UK (www.gov.uk)
The Disability Confident scheme aims to help employers make the most of the opportunities provided by employing disabled people. 
It is voluntary and has been developed by employers and disabled people’s representatives.  The Disability Confident scheme has 3
levels that have been designed to support employers on their Disability Confident journey.  Employers must complete each level
before moving on to the next, it is free to sign up and use the guidance How to sign up to the Disability Confident employer scheme - GOV.UK
(www.gov.uk) 
Winter Fuel Payment
11.6 million Winter Fuel and Cost of Living Payments have been made to pensioners across the UK so far this winter.  Pensioners
who haven’t received their payment by 13/1/23 should contact the Winter Fuel Payment Centre online or by telephone Up to £600
winter help paid to over 11.5 million pensioners - GOV.UK (www.gov.uk)  This video about Winter Fuel Payments can also be shared
https://www.youtube.com/watch?v=AaPoW5_nzKg 
Page 54

Page 55

END 
11/1/23
Page 55

Page 56

This page is intentionally left blank

Page 57

Argyll & Bute Citizens Advice Bureau Community Planning Partnerships Update Jan 2023
Cost of living crisis
Argyll & Bute CAB has experienced a significant ongoing rise in the number of clients seeking support
with energy costs.  As a result we have secured additional funding to support clients across the four
administrative regions 
We are providing 1:1 and group information sessions on energy efficiency measures. To arrange a
session please contact Libby Dobbie at the bureau 01546 605550 or email info@abcab.org.uk 
Additionally our advisers can support clients to negotiate with their suppliers, and have additional
supports available to those households that are off-grid or who rely on alternative sources of
heating. We are referral partners to a wide renage of emergency supports:
Home Heating Advice support fund
Fuel Bank Foundation
And have access to other smaller discretionary pots of money. We are delighted to announce a new
partnership in this vein with the An Suidhe Windfarm fund, managed by Foundation Scotland.
Households in the An Suidhe area can access confidential, free and independent advice and support
from the Bureau and also may be eligible for financial assistance. We would ask partners to refer
clients they believe may benefit from these funds directly to the bureau using the referral form at
the base of this update report. The AN Suidhe fund is strictly limited to households in these postcode
areas: 
Avich:  Furnace:  Inveraray:  Eredine/South Loch
Aweside: 
PA35 1HH 
PA35 1HJ 
PA35 1HL 
PA35 1HN 
PA35 1HS 
PA32 8XN 
PA32 8XX 
PA32 8XS 
PA32 8XU 
PA32 8XZ 
PA32 8XY 
PA32 8WD 
PA32 8YA 
PA32 8 (but not
Minard) 
PA33 1BJ 
PA33 1BW 
PA33 1BP 
PA33 1BS 
PA33 1BU. 
Our advisers continue to report increasing numbers of clients reporting complex or multifaceted
issues and an increase in mental health issues as a result. We are looking to develop networks with
existing mental health services and organisations to strengthen resources and supports to clients in
these situations. 
Volunteer opportunities:
The CAB is looking to begin our recruitment campaign for our spring cohort of volunteer trainee
advisers. The training of an adviser within the CAB network can take around 6 months and we strive
to develop confidence, research skills and strengthen confidence. The role is predominately aimed at
those who have perhaps recently retired, reduced their hours within a paid role or who are looking
at developing skills to return to the paid labour market.  Advisers can be based anywhere in Argyll &
Page 57 Agenda Item 5h

Page 58

Bute, however we are particularly looking for individuals from the region’s island communities, as
well as those in an around the larger urban areas (Oban, Lochgilphead, Helensburgh, Campbeltown).
We are delighted to have received funding from the HSCP Living Well Fund to support volunteer
adviser wellbeing, we are holding wellbeing lunches once a month with our teams bot in person and
virtually, and are looking arrange quarterly networking lunches with other 3rd sector organisations to
share ideas on how to increase wellbeing and volunteer/adviser resilience. We recently held a very
successful event with Lomond and Argyll Advocacy Services in the Comraich Centre in Lochgilphead
prior to the Christmas break. If your organisation is interested in being part of these events please
let me know by email jen.broadhurst@abcab.org.uk We would be happy to arrange an info session
with our development worker to discuss the opportunity and course expectations. Partners are
encouraged to invite clients/patients and service users to contact the bureau on 01546 605550
info@abcab.org.uk 
Community Consultation
We are currently running our annual consultation exercise with partner organisations in order to
review the work of the bureau and would welcome CPP attendee’s responses to this
https://www.smartsurvey.co.uk/s/ABCABCommunityPartnersSurvey/ 
Research project for 2023
Partners may recall our research project last year looked into the private rental sector across Argyll
& Bute and as a result we have engaged positively with the council on areas of mutual interest as we
represent client’s views on the private rental of homes in Argyll & Bute. 
This year we are looking to report on the experiences of carers in the current cost of living crisis. 
We would like to increase current engagement with local carers groups and explore research
opportunities with carers in these services. We hope to be in contact with local groups and services
over the next few weeks to arrange such. 
Page 58

Page 59

Community Planning Group information for February 2023 
Community Contacts offers free, impartial information, advice and support for people
of all ages around Self Directed Support (SDS).  We are funded by the Scottish
Government’s Support in The Right Direction Initiative (SiRD) and are working
together with partners, including Argyll and Bute HSCP. We do this by:
Assisting people to exercise their rights and to take as much choice and control as
they want about how their support is organised, managed and delivered. 
 Support people to prepare for the SDS assessment process; by exploring the
options open to them and through assistance, enable them to make informed
social care choices.  We can also assist people to challenge decisions made
about their SDS support. 
 Helping to reduce feelings of uncertainty or isolation by providing
opportunities to make valuable connections with other relevant organisations
or groups. 
 Providing intensive support around Option 1 (direct payments) and the
responsibilities associated with this option.   
Between March and October 2022 Community Contacts provided:
 Intensive support to 208 people, including unpaid carers.  
 Information and advice to a further 424 people.
We welcome contact with people at any stage of their process through SDS; anyone
can refer to us.  We are setting up drop-in sessions with local third sector
organisations and are building on links with local schools to ensure people have
access to information and advice about SDS.
Page 59 Agenda Item 5i

Page 60

This page is intentionally left blank

Page 61

North Argyll Carers Centre update 
We continue to see an increase in demand for our services. We have 678 unpaid carers
actively receiving support from us. Since the last meeting we have registered 29 new adult
carers and 15 new young carers. We received 61 referrals 44 of which were for new
registrations and 17 for Carer Support Plan reviews to help secure respite for the unpaid carer. 
For the first time since the pandemic began we held a Christmas Lunch for carers and those
they care for at the Royal Hotel in Oban. It was lovely to welcome people back to the event,
which saw 77 attending. We were blown away by the generosity of local businesses in
donating amazing prizes for our raffle, particularly in view of the difficult times we still find
ourselves in. Donors included Sea Kayak Oban, Oban Bay Hotel, Buildbase, Scottish Island
Jewellery, Matrix, The Pierhouse Hotel, BID4OBAN, S.D Carpet and Upholstery Cleaning, CA
Valeting and Detailing, Oban Phoenix Cinema, Trinity Hairdressing and Beauty, Chalmers of
Oban, The Perle Hotel and Cmac Beauty. We were grateful too to the Royal Hotel who created
a lovely atmosphere for the carers, made us feel really welcome and provided us with an
excellent Christmas dinner.
Thanks to our funders, primarily Shared Care Scotland, Children in Need, CalMac and the
HSCP, we have a varied program of peer support and short breaks activities for carers
planned for 2023. Our weekly after school groups, day trips and residentials for young carers
continue, with a sleepover at Dynamic Earth and a residential to the Outward Bound Trust’s
centre at Loch Eil coming up in the next few months. We have a blend of in person and online
activities and peer support groups available to adult carers too. Our weekly Blether Group,
Mindful Walking Group and Coffee Morning sessions continue to prove very popular, as does
our monthly session for parent carers and their children at the Bridge Café’s GoBananas soft
play centre. We also have activities running out in community venues with regular sessions
held in Oban, Kilmelford, Tobermory and, starting soon, on Seil. Our website and Facebook
pages have details of our regular groups and upcoming events and activities.
The cost of living crisis and rising fuel costs are having a significant impact on unpaid carers,
whose cost of living is already significantly higher than that of non-carer families. This coupled
with the recruitment difficulties in Social Care are adding to the pressure carers face. We
secured some additional funding from the HSCP to support a pilot which will enable us to put
in place regular home-help type preventative supports for carers, to reduce the risk of them
reaching crisis point. We have been compiling a list of local providers who may be able to
help. The aim is to provide support with regular household tasks which will free up carers’ time
to focus on things that will improve their mental and physical wellbeing. Examples might
include laundry, gardening, ironing and cleaning. For carers in very intensive caring roles, this
type of regular short break can be more accessible and practical than the traditional respite
model of a break away from home. We feel it will provide a valuable addition to the current
respite options open to unpaid carers. We would be keen to hear from anyone who might be
interested in being included on our list. We are also looking for local businesses who might be
willing to help carers out with one-off property maintenance and repairs. 
Page 61 Agenda Item 5j

Page 62

This page is intentionally left blank

Page 63

Argyll & Bute TSI Update
Cost of Living Crisis
We have been busy compiling a list of useful resources and warm spaces across
Argyll and Bute on our website. Click here to view the page.
If you know of a warm space that is not listed on the page please email
Laurenmartin@Argylltsi.org.uk with the details
TSI Inveraray Hub
Our hub is being used regularly by the Third Sector and is proving to be a very
useful space for hybrid meetings. The hub is also being offered as a warm space
for organisations in Argyll & Bute to use during the cost-of-living crisis.  
To enquire about the warm space, email laurenmartin@argylltsi.org.uk.
For more information on the hub, visit argylltsi.org/hub where you can book for
your organisation or leave a review if you have used the hub before. We really
appreciate any feedback to help us make the hub the best hybrid meeting space
for Third Sector Organisations in Argyll & Bute.
Skills Network training
We have partnered with The Skills Network to offer distance learning
qualifications fully funded via the Scottish Funding Council without cost.
Ideal for filling skill gaps or personal development, the online fully funded
courses are delivered virtually around your schedule and come with
nationally recognised qualifications upon completion.
For more information click here
All Our Children Network meeting
We will be holding the next All our Children Network meeting on Tuesday
14th February. This will be a hybrid meeting with the option to attend in
person at the Inveraray Hub. 
Page 63 Agenda Item 5k

Page 64

On the agenda is the merger between All our Children and The TSI children
and Young people network.
To view the agenda and sign up click here
TSI Social Enterprise Network 
The Third Sector Interface are holding another Social Enterprise Network
meeting on Wednesday 15th February 2023.  The meeting will a hybrid
meeting so you can attend in person or virtually online.  
For more details and to reserve a spot click this link   
Page 64

Page 65

Argyll & Bute Community Directory - Self Serve Function 
Following on from the launch of the Argyll & Bute Community Directory, we
introduced the Self Service functionality. This option will allow organisations to
claim their listings on the Directory and update and maintain the services
themselves. 
To self-serve, you will need to register and then claim your listing. Click the link
to start the registration process https://abcd.scot/registration 
Page 65

Page 66

This page is intentionally left blank

Page 67

Climate Change Working Group 
Date: 20 January 2023 
Climate Change Working Group Highlight Report
Argyll and Bute Climate Action 
1.0 Executive Summary
This CPP sub-group, known as the Climate Change Working Group are planning the
production of a Climate Change Action Plan for Argyll and Bute.
The Action Plan is proposed to be produced by employing a Climate Change Project
Manager to lead the process.
The Climate Change Working Group recently agreed to start the project by recruiting
a Project Manager this financial year. 
2.0 Highlight Report 
2.1  Action Plan background
The purpose of the Action Plan is to establish a region-wide climate risk assessment
and to develop an integrated set of adaptation, mitigation and engagement actions. 
The proposed post of Climate Change Project Manager will bring organisations,
businesses and communities together to develop a shared vision and understanding
of climate change risks and opportunities across the Argyll and Bute region. It will
identify priorities for communities, areas and sectors that will establish where (both
spatially and thematically) and how the region can increase resilience and adapt,
mitigate and engage on climate change issues.
It will identify, but not reproduce, climate change work either already happening or
part of an organisation or business’s own responsibilities.
2.2 Funding
The Climate Change Working Group are currently pulling together a funding package
to support the post of the Climate Change Project Manager.   
The cost of a Project Manager post is estimated to be in the region of £120,000 over
two years, which would include the salary of an appropriately qualified climate
leader, associated employer costs, T&S costs, etc. 
Page 67 Agenda Item 6a

Page 68

Subsequent to previous calls for funding contributions, we had two firm contributions
from partners: 
£20,000 NHS Highland - Argyll & Bute Health and Social Care Partnership
£50,000 Argyll and Bute Council 
We also recently received funding from NatureScot to the tune of £7,000 for this
financial year, and have submitted a further bid for funds from next year’s budget of
£15,000. 
2.3 Progress
The Climate Change working Group decided to start the project with the budget we
currently have. 
We have decided that we would advertise the Project Manager post with options for:
i)              0.75 Full Time Equivalent for two years, or
ii)             1.0 Full Time Equivalent for 18 months  
…depending on the preferences of the successful candidate. 
In any case we would need to continue searching for funding for either a continuation
of the project timeline, or to provide additional assistance for the part time set-
up.  However, it was felt that finding £30,000 in year two would be achievable.  
3.0 Summary
1. We propose producing a strategic Action Plan process as the best, and most
thorough, way to address the climate emergency in Argyll and Bute.
2. We have an approved governance arrangement for the Climate Change Project
Manager post.
3. We are actively pursuing the recruitment of a Project Manager to start this Action
Plan work and hope to have someone in post before the end of the financial year. 
Stan Phillips, Chair, CPP Climate Change Working Group 
For more information, please contact:
Stan Phillips, Operations Manager, NatureScot
stan.phillips@nature.scot 
Page 68

Page 69

January 2023
Oban Action Plan 
for Active Travel and Sustainable Transport Page 69
Agenda Item
7a

Page 70

Front cover photo: 
Ben Sunderland – Adventure Oban
2
Page 70

Page 71

INTRODUCTION 2
1. Executive Summary 2
CONTEXT 4
2. Purpose & Scope of the 
Action Plan 4
Sustaining Choices 4
Oban 5
Core Team 6
Anticipated Uses for the Action Plan 6
3. Planning and Transport 
Policy Context 7
National Policy Context 7
4. Planning and Transport 
Policy Context 10
Local Policy Context 10
Related Research and Projects 12
ENGAGEMENT PROCESS 14
5. Approach 14
Project Delivery – Overview 14
Project Delivery – Detailed Steps 14
Marketing and Publicity 15
Attendance and Response Information 15
UNDERSTANDING THE ISSUES 16
6. Evidence Gathering –
Community Engagement 16
Response Data 16
MAKING IT HAPPEN 17
7. Delivery Strategy 17
Key Actions Identified 17
Next Steps 21
APPENDICES 22
Appendix 1 22
The Action Plan 22
Appendix 2 28
Key National Policy Documents 28
Key Local Policy Documents 28
Contents
Oban Action Plan 
for Active Travel and Sustainable Transport
This project is supported by Smarter
Choices, Smarter Places (SCSP) and
PAS, a volunteer-led, independent and
impartial charity that helps people to
understand and influence the places
where they live, work and visit.
1
Page 71

Page 72

1. Executive Summary
1.1 The Sustaining Choices project has worked
with communities across Scotland to develop
a body of evidence that demonstrates the
changes they would like to see in their area
regarding walking, wheeling, cycling, and
public transport. This is particularly timely
given the challenge of climate change and
net-zero targets, the need to reimagine the
environments we live in as a result of the Covid
pandemic, and the need to implement a green
recovery as a consequence of both. This Action
Plan articulates the evidence base that has
been gathered for the communities of Oban.
1.2 Events were organised as a partnership
between Adventure Oban, Argyll and the
Islands Coast and Countryside Trust, and
Argyll and Bute Council, with the support of
PAS. Information gathering events were held
in July and August 2022, with a further event
held in November the same year. This event
reviewed the top engagement outcomes and
started to identify next steps.
1.3 The following Anchor Statement was
developed by the local core team to define
the goal of the engagement process: “Giving
Oban residents a voice to decide what should
be done to make active travel choices more
attractive and appealing.”
Introduction
Item Topic Action
1. Active Travel Introduce more safe bike routes
including to and from schools.
2. Active Travel
Improve the signage and
lighting for active travel routes
including public footpaths.
3. Active Travel Improve pavement network
connectivity.
4. Maintenance
Tidy up the general
appearance of Oban including
greenspace, pavements and
shop fronts.
5. Active Travel
Ensure pavements meet the
needs of those with additional
access needs including
disabled people.
6. Outdoor
Space
Consider how access to
greenspace can be improved
and the quality of existing
green space maximised.
7. Active Travel Improve infrastructure 
for cycling.
8. Road Layout Install clear signage for
narrow shared-use roads.
9. Road Layout
Ensure that pedestrian
crossings are in the right place,
meet modern standards and
prioritise pedestrians.
1.4 The full list of actions (39) shared by the
community can be found in Appendix 1,
under the following topic headings: Active
Travel; Bus Routes; Community Facilities;
Maintenance; Other Comment; Outdoor
Space; Parking; Public Realm; Public
Transport; Road Layout.
1.5 The following table summarises the top 9 Key
Actions identified for the area, as prioritised
by the community.
“This Sustaining Choices project
was a great way to bring together
and catalyse lots of conversations
that have been happening in the
town around tackling the climate
crisis, making active travel the easy
option and making our beautiful
town accessible for all.”
Isla McCulloch, Trustee – 
Adventure Oban
1.6 Key Actions proposed in Oban, in 
priority order:
2
Page 72

Page 73

“The Sustaining
Choices project
has worked with
communities
across Scotland to
develop a body
of evidence that
demonstrates the
changes they would
like to see in their
area regarding
walking, wheeling,
cycling, and public
transport”.
Photo credit: Ben Sunderland3
Page 73

Page 74

Context
2.  Purpose & Scope 
of the Action Plan
Sustaining Choices
2.1 Sustaining Choices as a project was primarily
set up to support economically disadvantaged
and isolated communities in urban and rural
Scotland who currently underutilise, or have
poor access to, sustainable transport and
active travel opportunities.
2.2 PAS is convinced that the future of
engagement in the planning system will be a
hybrid of face-to-face and online approaches
requiring the use of open-source, locally
adaptable methods and tools, and will
increasingly be citizen-led. Sustaining Choices
aims to explore and refine this approach to
community engagement.
2.3 Sustaining Choices has been funded by the
Paths for All Smarter Choices, Smarter Places
Open Fund and delivered by PAS working
alongside delivery partners in each community.
2.4 Participating communities for this cohort of
Sustaining Choices (2022-23) were Doune 
and Deanston (Stirling); Garnock Valley 
(North Ayrshire); Glasgow East End (Glasgow);
Oban (Argyll and Bute); Ullapool, Lochbroom,
and the surrounding area (Highland);
Whiteinch and Scotstoun (Glasgow).
Doune and 
Deanston
Whiteinch and
Scotstoun
Garnock Valley
Oban
Ullapool
Figure 1: Map showing the six communities
completing Sustaining Choices
Glasgow East End
4
Page 74

Page 75

Context
2.5 The goal of the project was to develop
an increased evidence base to support
sustainable transport and active travel
interventions in each location. It focuses on
communities at the margins or which don’t
have an existing evidence base, to help make
decisions to promote sustainable transport in
each area.
2.6 The following wider project outcomes were
achieved: 
•  Enabling communities to customise the 
Place Standard (PS) Tool for use in Active
Travel engagements using a simple,
replicable framework.
•  Training 25 community facilitators (citizens,
third sector and public sector workers) in
delivering their own engagement processes
using the Place Standard within their 
own communities. 
•  Establishing confidence to take other
processes forward, such as Local Place 
Plans (LPPs).
•  Developing six Active and Sustainable
Travel Action Plans for communities across
Scotland to use as an evidence base to
develop future interventions. 
2.7 At the core each plan consists of a vision for
change broken down into a series of actions.
The full list of actions can be viewed in
Appendix 1.
Oban
2.8 Oban is a town based in Argyll and Bute with
a population of approximately 8,5001. It is the
largest town between Helensburgh and Fort
William and is situated on the Firth of Lorn.
2.9 Popular with tourists, Oban features a 
number of attractions including McCaig’s
Tower. The coastal and mountainous features 
of the landscape of the area are also a draw
for visitors.
2.10 The town is based on the west of the A85.
Oban is also served by a train station, with
a number of ScotRail trains running between
Glasgow and Oban daily. Scottish Citylink
also provide connections to Glasgow as well
as Dundee (via Perth) and Edinburgh (via
Stirling). The town also provides important
ferry connections to islands including Colonsay,
Barra, Coll, and Tiree, amongst others.
1 https://www.argyll-bute.gov.uk/info/population-where-we-live
Photo credits: Ben Sunderland
5
Page 75

Page 76

¯
© Crown copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023368 1:15,000
Legend
Project Bondary
0 10.5
Kilometers Oban
Context
Trust (an Argyll-wide charity with a focus on
environment and sustainability); and Becky
Hothersall (Community Development Officer)
and Douglas Grierson (Sustainable Transport
Co-ordinator) from Argyll and Bute Council.
All members of the core team attended one
or both of the community facilitator training
sessions. All members also took active roles 
in designing, delivering, and capturing 
the engagement.
Anticipated Uses for 
the Action Plan
2.17 Following a key policy goal of the National
Transport Strategy for Scotland, it is hoped
that this Action Plan will be used to embed
the implications of these proposals in spatial
planning and land use decision making 
for Oban.
2.18 The Action Plan is also intended for use by
communities and local authorities to plan
changes to services and the built environment
or be used as a basis for developing specific
proposals. This may involve being submitted as
an evidence base to help justify further funding
applications for work such as feasibility studies
or securing bike-storage infrastructure.
2 HUSS Data for Oban
Core Team
2.14 This Action Plan was produced by a
partnership of Adventure Oban, Argyll and
Bute Coast and Countryside Trust, and Argyll
and Bute Council with support from PAS.
2.15 A core team was formed out of the partnership
between the above organisations. The
core team was responsible for day-to-day
decisions about the engagement process, from
strategy design, marketing and bookings to
workshop design, selection of key actions and
community-led engagement event delivery.
2.16 The core team consisted of Isla McCulloch and
Laura Corbe, trustees of Adventure Oban (an
Oban-based charity promoting equal access
to the outdoors); Jamie Joyce, Project Manager
of Argyll and Bute Coast and Countryside
Community
Boundary 
for Oban
2.11 The Sustrans Hands Up Scotland Survey
indicated around 41% of students in 2021
got to school by walking. This was followed by
30% of students travelling by bus. Thirty one
per cent of students were driven to school.
Rates of cycling were too low to quantify
without being able to maintain the anonymity
of students. Only one out of the three local
primary schools completed the survey in 2021.
The responses revealed in 2020 that between
31% and 49% of primary school pupils were
driven to school. And between 12% and 34%
of pupils walked. Data varies between schools
and between 2014 and 2021.2
2.12 Oban is also served by the Oban Community
Council who hold meetings approximately ten
times a year.
2.13 Community Boundary for Oban:
Page 76

Page 77

3.  Planning and Transport
Policy Context
National Policy Context
3.1 At a national level, policy controlling active
travel and sustainable transport will be
framed by the National Planning Framework
4 (NPF4)3 and Transport Scotland’s National
Transport Strategy 2 (NTS2)4. As of November
2022, NPF4 remains in draft form to be
laid before parliament, but no significant
changes are expected to the draft text
before adoption. Other key policy documents
governing active travel and sustainable
transport are listed in Appendix 2.
3.2 The draft NPF4 aims to deliver sustainable,
liveable and productive places across the
whole of Scotland. It states that every 
decision on our future development must
contribute to making Scotland a more
sustainable place, in part by ensuring that
all future development is accessible by
sustainable travel.
3.3 To this end, the intent of the dedicated
policy 13 on sustainable transport (p57)
is to encourage, promote and facilitate
developments that prioritise walking, 
wheeling, cycling and public transport for
everyday travel and reduce the need to 
travel unsustainably. There is a recognition
that reducing the need to travel unsustainably
is the highest priority in the sustainable
transport investment hierarchy and that the
upgrading and provision of additional active
travel infrastructure will be fundamental to the
development of a sustainable travel network
providing access to settlements, key services
and amenities, employment and multimodal
hubs (p108).
3.4 To this end, NPF4 states that proposals will 
be supported that improve, enhance or
provide active travel infrastructure, public
transport infrastructure or multi-modal hubs, 
in particular where proposals: 
i.  Provide direct, easy, segregated 
and safe links to local facilities via 
walking, wheeling and cycling networks
before occupation; 
ii.  Will be accessible by public transport,
ideally supporting the use of existing
services; 
iii. Integrate transport modes; 
iv.  Provide low or zero-emission vehicle
and cycle charging points in safe and
convenient locations, in alignment with
building standards; 
v.  Supply safe, secure and convenient cycle
parking to meet the needs of users and
which is more conveniently located than
car parking; 
vi.  Are designed to incorporate safety
measures including safe crossings for
walking and wheeling and reducing the
number and speed of vehicles; 
vii.  Have taken into account, at the earliest
stage of design, the transport needs
of diverse groups including users with
protected characteristics to ensure the
safety, ease and needs of all users; and 
viii.  Adequately mitigate any impact on local
public access routes. 
One goal of Sustaining Choices is to
communicate to developers a baseline
understanding of the needs of Oban so they
can develop evidenced proposals which meet
these criteria.
3.5 The Scottish Government also has a national
walking strategy ‘Let’s Get Scotland Walking’5
published in 2014 which aims to promote
walking as a means to improve the health of
the population.
3 https://www.gov.scot/publications/national-planning-framework-4-
revised-draft/documents/
4 https://www.transport.gov.scot/publication/national-transport-
strategy-2/
5 https://www.gov.scot/publications/lets-scotland-walking-national-
walking-strategy/pages/1/
Context
7
Page 77

Page 78

Context
3.6 Core aims of this policy include:
• Create a culture of walking
•  Better walking environments 
throughout Scotland
•  Ensure easy, convenient independent 
mobility for all.
All of these aims are corroborated by
the outcomes of the Sustaining Choices
engagement exercises.
3.7 More recently, the Scottish Government
has closed a consultation for the ‘Cycling
framework for active travel’. This will build 
on the Cycling Action Plan for Scotland 
(2010 – 2020) and set out strategic 
priorities for the next 5 – 10 years.6
3.8 Scotland’s National Transport Strategy
2 articulates a vision for a sustainable,
inclusive, safe, accessible transport system,
helping deliver a healthier, fairer and
more prosperous Scotland for communities,
businesses and visitors. Its four priorities each
have three outcomes and a series of policies
to guide their implementation. Its priorities
and outcomes are designed to be used as an
evaluation framework to measure progress.
6 https://consult.gov.scot/transport-scotland/cycling-framework/
Photo credit: Ben Sunderland
8
Page 78

Page 79

3.9 NTS2 acknowledges that people still face
barriers when wanting to cycle or walk to 
their destination, and that vehicles including
public transport continue to emit greenhouse
gases. It commits to addressing this.
3.10 Regarding inequalities, key issues identified by
NTS2 that need to be addressed regarding
active travel and sustainable transport include:
the risk of transport poverty for around 
1 million deprived households across Scotland
compounded by high costs for public transport
(p10); the gendered nature of access to
public transport and resultant inequalities
affecting women, as well as increased safety
fears when walking (p11); the barriers
young people face (particularly in rural
areas) regarding the availability and cost of
public transport, particularly to further and
higher education (p13); the need to meet
the travel needs of an increasingly elderly
population (p14); and the considerable
barriers to travel faced by disabled people
(p15). The policy also recognises divergent
transport and travel issues faced by different
communities across Scotland, whether urban
or rural, and according to socio-economic
factors. It states that “many of Scotland’s
most disadvantaged communities are in cities,
particularly in suburban areas. Yet, many
of them are now having to travel longer
distances to access employment opportunities
as significant numbers of jobs tend to be in city
centre locations.” (p17). But it also highlights
that people in rural areas usually have to
travel further to access services and tend to
have more limited choices when it comes to
public transport, the latter meaning that rural
households tend to drive more frequently than
urban households.” (p17).
3.11 Regarding climate change, NTS2 notes
that a key challenge is to reduce transport
impacts to help deliver the net-zero target
(p20). It admits that in terms of air pollution,
emissions of NOx from road transport are
reducing but not at the anticipated rate
(p13). It also recognises that a key challenge
involves getting people to change their travel
behaviour, both in terms of reducing demand
for travel and how they make particular
journeys, especially by encouraging walking
and cycling for short journeys.
3.12 Regarding the economy, the importance of
tourism is acknowledged but so too the impact
that increasing number of tourists, particularly
in the peak summer months, can have on
the transport system. This can particularly
impact rural communities, who are witnessing
deteriorating road networks as traffic
increases, particularly at natural and cultural
attractions, with the use of much larger and
heavier cars, caravans and motorhomes.
3.13 In terms of health and wellbeing, NTS2 notes
that road safety is critical, and that road
incidents in Scotland continue to have a
significant negative impact on individuals,
families and society as a whole. Similarly, all
people should be able to travel without fear
of crime, especially women (p37). School
children can be at risk when walking to school
from poor path infrastructure, especially
in rural areas. Over reliance on motorised
transport contributes to Scotland’s obesity
culture (p38).
3.14 NPF4 aligns itself with NTS2 in stating that
infrastructure investment should be prioritised
for locations where it will achieve the
preceding priorities and outcomes (reducing
inequalities, taking climate action, improving
health and wellbeing and helping deliver a
wellbeing economy).
Context
9
Page 79

Page 80

Context
3.15 Table 2: Core NTS2 Policy Goals
NTS2 Priority Key NTS2 Policies
Reduce Inequalities Minimise the connectivity and cost disadvantages faced by those in remote rural and rural
areas, including safeguarding of lifeline services.
Ensure transport in Scotland is accessible for all by supporting the implementation and
development of Scotland’s Accessible Travel Framework (specifically disabled access to
buses and trains, improved wayfinding and signage).
Remove barriers to public transport connectivity and accessibility within Scotland.
Ensure sustainable, public and active travel access to employment, education and training.
Improve sustainable access to healthcare facilities for staff, patients and visitors.
Take Climate Action Reduce emissions generated by the transport system to mitigate climate change; reduce
emissions generated by the transport system to improve air quality.
Support management of demand to encourage more sustainable transport choices.
Facilitate a shift to more sustainable and space-efficient modes of transport for people
and goods.
Improve the quality and availability of information to enable all to make more
sustainable transport choices.
Improve our health
and wellbeing
Increase safety of the transport system and meet casualty reduction targets.
Provide a transport system that promotes and facilitates active travel choices which help
to improve people’s health and wellbeing across mainland Scotland and the Islands.
Help Deliver Inclusive
Economic Growth
Provide a transport system which enables businesses to be competitive domestically, 
within the UK and internationally.
4.  Planning and Transport
Policy Context
Local Policy Context
4.1 The Highlands and Islands Transport
Partnership (HITRANS) (one of the seven
regional transport partnerships established
to improve the planning and delivery of
regional transport) Regional Transport
Strategy Refresh (draft, May 2017) updates
the 2008-22 strategy approved by Scottish
ministers in 2008, articulating a vision to
“deliver connectivity across the Highlands and
Islands which enables sustainable economic
growth and helps communities to actively
participate in economic and social activities.”7
4.2 The strategy recognises that while many
projects need to be delivered by a concerted
effort of institutions in partnership across the
region, working with local communities to
tailor local responses is key. It states that it
will endeavour to take a locality planning and
empowerment approach to address social
isolation and access deprivation at a locality-
based level. In so doing, it aims to work with
partners and communities to plan, design and
deliver the best mix of transport for their
area to address access barriers (p42).
7 https://hitrans.org.uk/Strategy/Regional_Transport_Strategy
10
Page 80

Page 81

Context
4.3 The strategy goes on to articulate a delivery
plan (p50-51). Delivery items particularly
relevant to the action points established
during Sustaining Choices include: 
•  Approaching the road maintenance backlog
on the local authority road network;
•  Developing a strategy for establishing
transport routes/corridors as visitor
attractions including the NC500;
•  Maximising the potential of the Highland
rural rail routes, including journey time
reductions, increased frequency and better
rolling stock;
•  Implementing concessionary fares, to include
community transport services and local ferry,
air and rail services where appropriate;
•  Developing comprehensive public transport
information and mapping;
•  Implementing the Low Carbon Strategy;
•  Implementing the Regional Active 
Travel Strategy.
4.4 In terms of active travel, the strategy commits
to: improving integration of cycling as part of
longer public transport journeys; improving
walking and cycling links within the region
(making the case for further financial support
towards the development of improved
walking and cycling links to and within towns
and to employment, health, leisure and
retail facilities as well as to visitor sites); the
provision of associated promotional materials,
including production of high-quality, consistent
mapping of routes; and supporting the
provision of improved walking and cycling
access at public transport interchanges
(p45/6).
4.5 HITRANS acknowledges that while progress
has been made in recent years in providing
infrastructure, facilities and information to
encourage more active travel, there is an
ongoing need to offer:
•  More extensive and better-quality
pedestrian and cycle networks;
•  Design of developments and road transport
improvements which meet the needs of
pedestrians and cyclists;
•  Information about the networks and facilities
that are available;
•  Measures to increase pedestrians’ and
cyclists’ confidence in their personal safety;
•  Convenient and secure cycle parking
facilities;
•  Segregated cycle routes; and
4.6 General information, and promotion of active
travel to continue to change attitudes. Argyll
and Bute’s Local Development Plan is in the
process of being updated. A proposed Local
Development Plan 2 currently outlines several
objectives including ‘High Quality Places’. 
Under this objective is the intention that the
next Development Plan will ‘promote the
creation of safe, inclusive and high-quality
places where people want to live, work, invest
and visit and where they are encouraged to
lead active lifestyles.’8
4.7 Proposal A in the plan refers to a Strategic
Development Framework for Oban. In
relevance to this report, the proposed
Strategic Development Framework includes
reference to ‘rationalisation of existing
land uses’, ‘improved traffic management
and parking, development of the Strategic
Transport Hub’, and ‘investigating potential
improvements to the network resilience
associated with the strategic road network.’
4.8 Policy 4 focuses on Sustaining Development
and outlines relevant aspirations including
‘utilise public transport corridors and active
travel networks’.
4.9 Policy 6 refers to Green Infrastructure
including green spaces as explored during
this engagement exercise.
8 Argyll and Bute PROPOSED LOCAL DEVELOPMENT PLAN 2
11
Page 81

Page 82

Context
4.10 Active travel is directly refererenced under
‘Connectivity’ with aspirations that active
travel networks improve quality of life and
reduce resource consumption. Policy 32
proposes that:
•  Existing active travel networks and rights of
way are safeguarded and integrate with
the development;
•  Active travel routes within development are
delivered, as appropriate, ensuring that any
special mobility and safety requirements
are also addressed;
•  In all cases consideration requires to be
given to the integration of active travel
routes to adjoining areas, in particular
to the Core Path network, Public Rights
of Way, safe routes to school network,
green infrastructure and to link to the
foreshore and to public transport facilities.
The scale and nature of the proposal and
proximity of active travel routes will be
taken into account by the planning authority
in determining the requirement for such
infrastructure, which may be subject of
planning conditions or agreements.
From the review of local policy it can be
concluded that there is a place for the Oban
action plan for Active Travel within policy
aspirations for the area. Furthermore, this
plan should be able to serve as an evidence
base to inform these aspirations and act as 
a remit for change.
Related Research 
and Projects
4.11 In 2019 the local authority carried out their
own Place Standard exercise: How Good
is Your Place. This exercise was broad and
covered all aspects of the Place Standard
tool. While the Sustaining Choices exercise
also used the Place Standard tool the
focus was specifically on Active Travel, with
emphasis given to walking, cycling, wheeling,
and streets and spaces.
4.12 The 2019 Place Standard exercise recorded
scores of 4 for both Moving Around and
Streets and Spaces (with 1 meaning there is
much room for improvement and 7 meaning
that there is little room for improvement).
Commentary from the 2019 report was
echoed within this engagement exercise.
Data from the Place Standard exercise have
Photo credits: Ben Sunderland
12
Page 82

Page 83

Context
been used to inform key strategic documents
for Argyll and Bute. These include informing
the consultation stage of the Argyll and
Bute Outcomes Improvement Plan 2024-34.
Consultation is currently underway on this
document, which will set out the Community
Planning Partnership’s vision for achieving
long term outcomes for communities in Argyll
and Bute. There are also plans to regenerate
Gibraltar Street in Oban, developing the
streetscape and improving access to the 
town centre.
4.13 Outwith the project boundary but still 
related to active travel, there has been
some design work conducted for an active
travel route between Dunbeg and Connel.
References to this route were made
throughout the engagement.
4.14 Further, the Isle of Kerrera is also outwith the
Oban boundary, but all the island residents
rely on Oban for their public services,
schooling, nursery, healthcare etc. The local
development trust on Kerrera has recently
brought in an e-bike scheme for residents
which has been hugely impactful in reducing
the need for short car journeys and has
improved the connectivity of the island. They
have also recently completed a significant
project in the delivery of a new road for the
island which has also been transformational
for the islanders’ connectivity and access to
Oban and the mainland.
4.15 A total of 41 classes from Oban High were
surveyed using a short online survey. Due to
time restrictions these responses were not
included in the main data analysis. However,
their feedback strongly echoed the overall
engagement exercise. Out of 695 students
from the 41 classes, 66% said that they
regularly walked into Oban. Far fewer
said that they cycled, with 7% of students
responding that they often cycled into town.
‘Too far’ was the most common reason given
by students for not walking or cycling to
school. Suggestions for improved sustainable
and active travel included: more cycle paths;
more reliable and frequent public transport;
foldable bikes in station square; access to
electric scooters; and safer pavements. The
full set of survey data can be accessed from
the project team.
This Sustaining Choices engagement exercise
chose to focus primarily on active travel with
streets and spaces being captured within 
that focus.
13
Page 83

Page 84

Engagement Process
5. Approach
Project Delivery –   
Overview
The following flow chart lays out the stages of
the engagement process that was undertaken,
with each stage being explained more fully in
the following section.
Project Delivery – 
Detailed Steps
5.1  The following describes the various stages 
of the engagement process:
5.2 After an initial exercise to select interested
communities, the project began by training
community facilitators to engage their
communities in an online environment. Trainees
were a mix of local citizens and third-and
public-sector co-workers.
5.3 Community facilitators were trained in
engagement principles using an adapted
version of PAS’s SP=EED® training.9 This
was focused on online engagement and
encouraged the core teams that had formed
to begin developing engagement strategies
for their communities (marketing, stakeholders,
consultation goals). A second session then
introduced the Place Standard tool10 and 
how to use it as a structured framework of
questions, alongside training in basic facilitation
skills. The goal was to begin a learning journey
in which the community facilitators, from
whatever baseline understanding they held,
gradually grew in confidence to run their own
engagement sessions with their communities.
The communities developed their own avenues
of engagement depending on the resources
and opportunities in each place.
5.4 For each community the core team developed
a workshop plan with input from PAS. Each
community selected 3-4 high level questions
from the Place Standard tool. Two further
questions asking about people’s high-
level priorities and their suggestions for
actions to implement these were included.
These questions formed the basis of each
engagement workshop, together with an
‘Anchor Statement’ which described the goals
that each community wanted to achieve with
their engagement.
5.5 The Anchor Statement designed by the 
Oban core team was as follows: “Giving
Oban residents a voice to decide what should
be done to make active travel choices more
attractive and appealing.”
5.6 A simple question and response style
workshop based on these questions with
groups of between three and seven people
in a break-out room was generally selected
by each community. This simple approach was
taken to make the process accessible and
deliverable by community facilitators who
were often on a steep learning journey. The
‘open-source’ nature of the Place Standard
and its teachability made it ideal as an
accessible tool to be used in this format.
Details of the questions chosen by each
community are given below.
9 https://www.pas.org.uk/what-we-do/speed/
10 https://www.placestandard.scot/
Selection of
Communities
Training of
Community
Facilitators in
SP=EED and
the Place
Standard
Workshop
Plan
Development
Engagement
Strategy
Development
Data
Coding
Delivery
Summit
Finalisation
of the
Action Plan
Follow-on
Community-led
Workshops
Initial
Assessment of
Coded Data
Initial PAS-led
Engagement
Workshop
14
Page 84

Page 85

Engagement Process
5.7 PAS staff and volunteers then used this
workshop plan to deliver an initial
engagement workshop in each community,
with core teams for each community
running the bookings and publicity process.
Community facilitators took the role of note-
taker in each break-out room, alongside a
PAS volunteer facilitator. In this capacity they
were able to observe how an engagement
was delivered first-hand, as the next stage
of the learning journey. PAS facilitators
also made sure to secure the numeric data
required by the Place Standard to gain the
level of improvement in a given topic area
that participants felt was required.
5.8 Each core team then went on to deliver
engagements on their own, either face to
face or online. This was the final stage of
their learning journey. They were either run
as sessions open to the general public or as
sessions tailored to specific groups, such as
young people. Some groups also chose to
create online surveys, often using Microsoft
Forms, to gather data, as an additional
helpful stream of information.
5.9 Data gathered was typed-up by scribes into
a series of statements, which were passed
back to PAS for processing. PAS staff took
the data received and thematised the data,
before synthesising this information into
an initial draft document of priorities and
actions, along with an indicative assessment
of the level of importance of each, based on
response rate.
5.10 The draft list of actions of priorities was
passed for initial assessment back to the
core team. The core teams then worked to
short-list key actions that they felt warranted
deeper attention by the community.
5.11 Lastly, an online delivery summit 
(facilitated by PAS) was held. Nine key
actions were highlighted and explored
further. Discussions in break-out groups
facilitated by PAS volunteers developed
suggestions for delivery partners and possible
first steps that could be taken.
5.12 The outputs from the delivery summits were
then integrated into the initial draft before
the finalisation of the Action Plan.
Marketing and Publicity
5.13 Engagement events were publicised by
the core team using Eventbrite, Facebook,
newsletters and direct marketing. Engagement
also happened in public spaces offering a
great opportunity to engage a broad range
of people.
Attendance and 
Response Information
5.14 Participant and/or survey response
information is given below:
11 41 classes were surveyed as groups. Data not included in the main
data analysis exercise but summarised as part of this report.
Location Event type Date No.
Engagement 1 Online 27 June 16
Engagement 2
On Street
Engagement –
Atlantis Leisure
Centre
10 August 25
Engagement 3
On Street
Engagement –
Dungallan Park
10 August 9
Engagement 4
Ad hoc conversations
with parents and
other interested
parties
Ad Hoc 17
Engagement 5 Access Panel 24 August 4
Engagement 6 Oban High School
Survey 15 September 69511
Engagement 7
Adventure Oban
Big Bike Weekend
– evening open
meeting
1 October 12
Total attendance/responses during
information gathering phase 778
Delivery
Summit PAS-led 1 November 22
15
Page 85

Page 86

Understanding The Issues
Question Rating/7
Can you easily walk quality routes in Oban? 4
What do you think of cycling in Oban? 3
Are places suitable to use with a
wheelchair and a mobility aid? 3
What are people’s experiences of Oban’s
buildings, streets and public spaces? 3.5
6.  Evidence Gathering –
Community Engagement
Response Data
6.1 An extensive Place Standard exercise was
conducted across Argyll and Bute by the
local Community Planning Partnership, using
all 14 of the Place Standard criteria as part
of their ‘How Good is your Place’ community
engagement. Aware that there had been
recent engagement using the Place Standard
locally, the Oban team wished to use this
opportunity to focus and achieve detail
specifically regarding active travel.
6.2 The Place Standard was used as the basis
for the engagements held during Sustaining
Choices. In its full version, 14 high-level
questions based on different themes are
asked of groups, with follow up questions
deployed to secure more precise data. During
Sustaining Choices, in order to focus on themes
pertinent particularly to active travel and
sustainable transport, and because of the
limited time available during online sessions,
core teams were encouraged to choose
a smaller number of the Place Standard
questions to work with, as well as the final
prioritisation and implementation questions.
The core team in Oban therefore elected to
split the Place Standard question 1 (Moving
Around) into separate discussion focusing on
walking, cycling, and wheeling/mobility aids
and question 4 (Streets and Spaces).
6.3 Following the analysis of the data, improving
signage for footpaths, tidying up Oban in
an ecologically sensitive way and more safe
cycle routes emerged as the core issues that
participants wanted to see addressed.
6.4 During the workshop, participants were 
asked to grade their community in response
to each question by giving a rating on a scale
from 1 to 7. When answering together, a
group agrees the rating among themselves,
where 1 means there is a lot of room for
improvement and 7 means there is very little
room for improvement. Usually, a compass
diagram is generated to graphically display
the grading of the community according
to that group. It is important to note that
scores were only collected during the online
workshop and during the school engagement
(only walking and cycling) and not at any
other point of the engagement.
6.5 Grading still took place for the chosen
questions, and are given below, but the
compass diagram output has not been
considered appropriate because of the
limited number of core questions. The
following gradings for Oban are averaged.
6.6 Ratings by question (where 1 means there is
a lot of room for improvement and 7 means
there is very little room for improvement).
6.7 The scoring tentatively indicates some degree
of satisfaction on the points discussed with,
however, significant room for improvement.
The Key Actions and wider Action Plan point
to opportunities for such improvement.
6.8 Once aggregated and coded, all of the
responses made by participants resulted 
in a series of vision headings and aims. 
For each aim, priorities and concrete actions
for implementation have been developed.
6.9 The full list of actions (39) shared by the
community can be found in Appendix 1,
under the following topic headings: Active
Travel; Bus Routes; Community Facilities;
Maintenance; Other Comment; Outdoor
Space; Parking; Public Realm; Public
Transport; Road Layout.
16
Page 86

Page 87

7. Delivery Strategy
Key Actions Identified
7.1   Following an assessment of all 39 potential actions identified during the
information gathering stage, the core team identified nine key actions to focus
on during the delivery summit.
7.2   Participants at the summit discussed the key actions in break-out groups and
decided whether a given action could be delivered as a Quick Win, or else
could be implemented in the short, medium or long term.
7.3    Further discussions then explored which community organisations or outside
organisations could support these actions moving forward. 
Each break-out group then explored appropriate first steps to implement the
key actions.
Making it Happen
17
Page 87

Page 88

Making it Happen
Action Response
rate
Timescale:
Short/Medium/Long Term
Who could help First steps
Introduce more safe bike routes,
including to and from schools
Very High Long term Local authority
BEAR/Transport Scotland – trunk road authority
Developers
Adventure Oban
Users – high school & primary school students, nurseries,
cycling walking groups
Housing Associations
ACT (Argyll and the Isles Coast and Countryside Trust)
NACC (North Argyll Carers Centre)
BID (Business Improvement District)
Sustrans
HITRANS
Identify groups involved, schools, access panel, ACT,
NACC, Adventure Oban, BID
Identify & prioritise routes
Soroba Road (from housing area to the school campus),
access roads to Atlantis
Identification of ownership/responsibility of 
road network.
Focus on existing road network initially – consider easy
wins with pavement widening etc.
Ensure new housing developments consider connections.
Linking up existing off road/on road routes –
considering shared used paths
Improve the signage and lighting for
active travel routes including public
footpaths
Very High Short term Paths for All
BID (Business Improvement District)
Argyll and the Isles Tourism Cooperative (AITC)
Wee Walk Oban
Access Panel
Blind Vision
Local authority
Landowners
Housing Associations
Sustrans
HITRANS
Use Paths For All grading tool for identified routes so
you know what to expect from the path. Have a map 
in town highlighting all the marked routes.
Make sure signs are also accessible. Tourist/Alba
involvement.
QR codes for Komoot. Road signs from Soroba 
to campus.
Establish ownership/responsibilities.
Planning authority – maintenance and management.
Timeframes: Quick Win = 6 weeks; Short Term = 6 months; Medium Term = 1 – 2 years; Long Term = 3+ years
Response rates: Low = Less than 5 mentions, Medium = 5-20, High = 20-29, Very High = 30+
7.4 Key Actions: 
Timeframe and Delivery Partner overview
18
Page 88

Page 89

Action Response
rate
Timescale:
Short/Medium/Long Term
Who could help First steps
Improve pavement network High Long term Local authority – consultation notices.
Retail park/private landowners
Transport Scotland
Community councils/local councillors.
Police re pavement parking
Housing Associations
Understanding responsibilities of roads departments
Identifying lines of communication/forum for when
investment is being made and when there are
opportunities to feed in.
Collating and delivering evidence base (this action
plan) to the decision makers
Identify all the pavements that need improving 
and prioritise.
Tidy up the general appearance of
Oban including greenspace, pavements
and shop fronts
High Medium term Keep Oban Beautiful, Communication with homeowners
keeping bins in better places, Transport Scotland
for main roads, BID, local authority for better (more)
placement of bins
Map bins that are an obstruction/eye sore and hazard
for those with limited mobility or vision.
Determine who owns green spaces & what would 
help volunteer groups for gardening & wildlife green
spaces etc.
Ensure pavements meet the needs of
those with additional access needs,
including disabled people
High Medium term Local authority
Transport Scotland
Housing Associations
Access Panel
Engaging with Access Panel, Blind Vision group etc.
already under way.
Ensure all singing from the same hymn sheet and support.
Consider how access to greenspace can
be improved and the quality of existing
green space maximised
High Medium term Local authority
Dungallan Park – Sailing Club/wider community/ABC
Atlantis Leisure
Glencruitten Estate/Greenshoots Garden/Hope Kitchen
Greenspace at back of Rockfield
Oban and Lorn RFC
Woodland Trust
Dunollie Estate
Keep Oban Beautiful
Paths for All
Access Panel
Fieldfare Trust
Identify who is responsible for green spaces.
Important to expand the areas readily accessible from
town so people don’t have to drive to e.g. Ganavan.
Keep up momentum on recent progress at Dungallan
Park and Mossfield sites while working on continued
improvements and investment required to these spaces.
Making it Happen
Timeframes: Quick Win = 6 weeks; Short Term = 6 months; Medium Term = 1 – 2 years; Long Term = 3+ years
Response rates: Low = Less than 5 mentions, Medium = 5-20, High = 20-29, Very High = 30+
19
Page 89

Page 90

Action Response
rate
Timescale:
Short/Medium/Long Term
Who could help First steps
Improve infrastructure for cycling Medium Short term Atlantis Leisure
Rockfield Centre
Retail Park
Local Authority
Transport Scotland
Live Argyll
Housing Associations
Paths for All
Sustrans
HITRANS
Cycling Scotland
Identify areas that need bike locks as e.g. Cycling
Scotland have funding available.
Install clear signage for narrow 
shared-use roads
Medium Short term Local authority & roads authority
Transport Scotland
Police
Paths for All
HITRANS
Link up with wider campaigning groups.
Fulfil a needs assessment.
Enforcement?
Ensure that pedestrian crossings are in
the right place, meet modern standards
and prioritise pedestrians
Medium Medium term Local authority
Transport Scotland
Access Panel
Blind Vision group
HITRANS
Access Panel already moving forward with this one.
Submission of needs being made.
Making it Happen
Timeframes: Quick Win = 6 weeks; Short Term = 6 months; Medium Term = 1 – 2 years; Long Term = 3+ years
Response rates: Low = Less than 5 mentions, Medium = 5-20, High = 20-29, Very High = 30+
20
Page 90

Page 91

Next Steps
7.5   The Strategic Transportation team and other partners/funders will use this
plan to better understand what are the active travel priorities in Oban and
who are the key stakeholders. The Action Plan will also serve as evidence
of support for projects. It will be very useful as supporting documentation
in funding applications and to inform community-led development such as
Community Action Plans or Local Place Plans.
7.6   Correspondence regarding the implementation of this Action Plan should be
directed to hello@adventureoban.org
Making it Happen
21
Page 91

Page 92

Appendices
Appendix 1
The Action Plan
Full list of actions suggested by community during engagement events
Key Action Notes/Detail
Primary theme – Active Travel (AT)
1. Improve active travel routes for wheelchair users and buggies etc.
Ensure pavements meet the needs of those with additional
access needs
• Restrict parking by dropped kerb at exit of little lane at Millpark
•  Reducing obstacles and incorporating dropped kerbs (i.e. where the green foot bridge over the rail track comes out at Soroba & at Soroba bus
stops).
•  For example, at Station Square appropriately colour coded dimple paving should be installed at the table top feature on the vehicular approach.
Further, the shared (level) surface makes this area very difficult to navigate for those with visual impairments (e.g. guide dogs are trained to follow
a raised kerb and will stop only at an upstand).
•  Gibraltar Street (currently under consultation and earmarked for investment)
2. Improve access to multi-modal paths, including cycle routes
Improve pavement network connectivity Suggestions included:
• Pulpit Road
• Soroba Road
• Between Dungallan Park and Calmac Pier
• Rockfield Road
• Pedestrian routes to McCaig’s Tower
• Glenshellach Terrace
• Laurel Crescent to Hazeldene Crescent
• Glencruitten Road
• Route to High School
• Glenshellach to High School
• Catalina Avenue to Hayfield
• To Tesco and Homebase (across the retail park in general)
• Roads to Gallanach and Ganavan
• Reinstate old right of way out the back of Wee Ganavan
• Tesco and Gibralter Street (currently under consultation and earmarked for investment)
• Open a short cut between the ferry terminal and the station car park for pedestrians & bikes
22
Page 92

Page 93

Appendices
Key Action Notes/Detail
Pavements could be widened in some areas to improve
safety and accessibility
Suggestions include widen the footway on A85 opposite Croft Road, below the Eventide home and on George Street pavements
Improve safety on key roads Rockfield Road Consider incorporating ‘pedestrian refuges’ that pedestrians can step into to allow cars to pass.
Soroba Road Full pavement connectivity for pedestrians to schools and the hospital. Explore the possibility of an offroad or ‘quiet road’ cycle path
from Glencruitten to Soroba as current road is a significant barrier to cycling south out of town at the moment.
Glencruitten Road Improved pavement connectivity and better street lighting to Mossfield area (as a minimum).
Ganavan Road Signage of shared use of the road with pedestrians and cyclists, speed limit enforcements. Explore alternative off road/path options.
Improve maintenance of paths and pavements Examples included:
• The ‘chicken run’ route
• Jacob’s Ladder
• The wooden steps on the path from Kilbowie to Ardbahn Crags
• Broken water ways at the top of Craigard Road
• Path from Glenshallach Terrace down to Tesco carpark
Police training on cycle safety
Promote Oban as an active town and active space
3. Develop a culture that promotes safe active travel
Introduce behaviour change initiative for both drivers and
cyclists to improve safety for road users
Have police patrol on bikes
4. Improve facilities for cycling
Provide opportunities to learn about safe ways to cycle Bikeability is now being delivered by Live Argyll in A&B schools, encourage uptake of this, linking with community-led bike events delivered by
Adventure Oban/ACT
Improve infrastructure for cycling At key points in town the Retail Park, Atlantis Leisure, The Rockfield Centre, the Hospital, etc.
This includes:
• Secure bike parking
• More places to lock bikes
• Charging points for e-bikes
• Parking outside of town and showers for people to cycle into work
• Water fountains
23
Page 93

Page 94

Appendices
Key Action Notes/Detail
5. Develop comprehensive and safe cycle routes
Introduce more safe bike routes including to and from schools Potential locations could include:
• To high school to Rockfield primary school campus
• South Pier to Dungallan & Gallanach
•  The Oban town end of the CalMac pier has a short barrier to allow bikes to pass
The same at the other side of the terminal building would make a bike route to Pulpit Hill/Gallanch easier avoiding the ferry foot passenger area
• War Memorial to Ganavan
• Oban hill
• Pulpit hills
• Quarry road to Mossfield Drive (and other parts of Glencruitten Road)
• Ganavan Road
• From the primary school campus south out of town to Kilmore
•  Develop safer cycle route to Atlantis that avoids the Bealach-an-Righ, possible contraflow for bikes on (currently one way) Breadalbane Street 
as an option
• Remove street parking to accommodate bike lane on the one way system in town
• Explore connecting Star Brae/Stevenson Street with Market Street for bikes (thus connecting Longsdale to the high school avoiding the trunk road)
• Make Market Street two way for bikes
• Connect the bike route from “The Summit” (by Achnalaraig Stable) to Polvinister Road
Keep existing cycle paths clear and well maintained 
(including mountain bike trails)
Regular community-led cycling events like Adventure Oban’s Big Bike Weekend can bring volunteers together to support with this, especially
mountain bike trails.
Allow concession from police when cycling on pavements Particularly if roads are less safe (e.g. A85) and one-way roads e.g. Breadalbane Street
24
Page 94

Page 95

Appendices
Key Action Notes/Detail
6. Develop more signage and information about routes
Improve the signage and lighting for active travel routes
including public footpaths
Potential routes include:
• The path from Kilbowie to Ardbahn Craigs
• Glencruitten woods
• To the beaches (wee Ganavan & Ganavan)*
• Corran halls to war memorial via The Witches*
• To SAMS
• Up to the Hydro
Multiple routes to McCaigs Tower (current signs point walkers up Hill Road which has no pavement and is already difficult to negotiate 
without pedestrians)
• Pulpit Hill
• Pulpit Drive to Glenmore Road
• Glenshellach to the hospital & campuses*
• Between Lynn Road and Millpark Road*
• Golf course
• Birchwood to Mossfield*
•  Develop clearer signage to the bike paths in and around town centre the regularly used footways linking George street and the Esplanade on
either side of the Regent Hotel*
* Better lighting was specifically mentioned on these routes
Improve signage at Station Square for key walking and
cycling routes from town
Develop a boardwalk from Oban to Ganavan
Primary theme – Bus Routes (BR)
7. Improve options for accessing bus travel
Trial a free shuttle bus day/week from Ganavan to
Gallanach or Soroba to help get people back on buses 
& gauge interest in routes
Review suitability of bus stops Review the location of bus stops, the seating in bus stops and also the proximity of drop kerbs, especially in Soroba
Primary theme – Community Facilities (CF)
8. Consider the use of properties and public spaces
Develop bad weather public spaces Opportunities for more community-led activities at Corran Halls, Rockfield Centre etc.
25
Page 95

Page 96

Appendices
Key Action Notes/Detail
Primary theme – Maintenance (M)
9. Address issues regarding general care and maintenance in an area
Tidy up the general appearance of Oban including
greenspace, pavements and shop fronts
Includes:
• Putting away bins which, as well as an eyesore are a hazard for those with limited mobility and vision
• Clearing litter
• Improving pavements
• Improving shop fronts
• Improving the regularly used footways linking George street and the Esplanade on either side of the Regent Hotel
• Improve appearance of Jacobs Ladder
• Cutting back overgrown trees
Primary theme – Other Comment (OC)
10. Consider the development of a car club scheme
Develop a car sharing scheme or car club
Primary theme – Outdoor Space (OS)
11. Better understand, maintain, and manage green spaces
Consider how access to green and natural spaces can 
be improved
Areas include Corran Halls, Dungallan Park and the green space at the top of Craigard Road, McCaigs Tower, the Hydro, the block above 
The Rockfield Centre and an area outside Mark Dan’s
Clarify ownership of these and other areas and explore if/support local groups to take ownership
Acknowledge progress made at sites like Dungallan Park and Mossfield while keeping up momentum for further investment and improvement 
in these vital spaces
Maximise the quality of existing green and natural spaces Maximise the quality of existing green spaces and natural spaces to support biodiversity, to be safe, well maintained and provide multiple 
functions and amenities to meet the varying needs of all groups
12. Development of a skatepark or similar
Develop a skate park/pump track/skills park to build kids
confidence on bikes/scooters etc.
Primary theme – Parking (P)
13. Improve parking provision.
Better management of parking in Oban including offering
more free parking. Manage over-parking at the bottom of
Pulpit Road
This was not a focus of the study, but it was felt that it was very much an enabler
26
Page 96

Page 97

Appendices
Key Action Notes/Detail
Primary theme – Public Realm (PR)
14. Consider changes which make public spaces more comfortable and accessible
Make shops and facilities more accessible by promoting
push, rather than pull doors
This makes access easier especially for those using wheelchairs or other mobility aids
Provide better seating in public places Dungallan Park, area in front of Markie Dan’s, Station Square, and going up hills
Improve green spaces by offering more amenities including
public toilets
Noted that the community campaign to keep the Ganavan toilets open over the winter has made that crucial greenspace much more accessible to
all members of the community
Install better signage to toilets at Station Square
Primary theme – Public Transport (PT)
15. Improve access to public transport
Improve public transport and make easier to use.
Advise passengers of the adventure carriage that it costs
extra to sit in the bike carriage
Primary theme – Road Layout (RL)
16. Consider changes to roads to improve efficiency and safety
Consider one way system on Oban Hill which may allow 
bus access to this area which is currently not serviced.
Refresh road markings. e.g. speed limit signs. Areas noted were at the Laurel Road and Ardconnel Road intersection
Ensure that pedestrian crossings are in the right place, meet
modern standards and prioritise pedestrians.
Specifically, reassess the location of the pedestrian crossing near the Oban Inn and consider relocating to nearer the previous location outside the
tourist office so that the footway is not blocked by people waiting to cross. Crossings which need modernised include the A85 George St, Esplanade,
Corran Halls and A816 Fire Station. Pedestrian crossing at Lidl does not comply with regulations, consider moving to opposite Dunmar Court.
Install clear signage for narrow shared-use roads. Areas include:
• South Pier to Dungallan & Gallanach
• War Memorial to Ganavan
• Oban hill roads
• Pulpit hill
• Quarry road to Mossfield Drive (and other parts of Glencruitten Rd)
Manage the volume of traffic in Oban. Consider alternative
solutions to reduce vehicle numbers travelling through and
parking in Oban i.e. Oban Ring Road
27
Page 97

Page 98

Appendix 2
Key National Policy Documents
Let’s Get Scotland Walking – The National Walking Strategy (Scottish Government, 2014) – 
https://www.gov.scot/publications/lets-scotland-walking-national-walking-strategy/pages/1/
Scotland’s Fourth National Planning Framework – revised draft (2022) – 
https://www.gov.scot/publications/national-planning-framework-4-revised-draft/documents/
National Transport Strategy 2 (Transport Scotland, Feb. 2020) – https://www.transport.gov.scot/publication/national-transport-strategy-2/
National Walking Strategy (2014) – https://www.gov.scot/publications/lets-scotland-walking-national-walking-strategy/
Active Travel Task Force Delivery Plan (Transport Scotland, 2019) – https://www.transport.gov.scot/publication/active-travel-taskforce-delivery-plan/
Active Travel Framework (Transport Scotland, 2019) – https://www.transport.gov.scot/active-travel/active-travel-framework/
Transport and Poverty in Scotland, Report of the Poverty and Inequality Commission (June 2019) – https://bit.ly/3j5Lwir
Cycling Action Plan for Scotland 2017-2020 (Transport Scotland, 2017) – 
https://www.transport.gov.scot/publication/cycling-action-plan-for-scotland-2017-2020/
Scotland’s Accessible Travel Framework Our Delivery Plan for 2019-2020 (Transport Scotland, 2019) – 
https://www.transport.gov.scot/publication/scotland-s-accessible-travel-framework-delivery-plan-for-2019-2020/
Key Local Policy Documents
The Highlands and Islands Transport Partnership (HITRANS) Regional Transport Strategy Refresh – https://hitrans.org.uk/Strategy/Regional_Transport_Strategy
HITRANS Active Travel Strategy (2018) – https://hitrans.org.uk/Documents/HITRANS_ReACTS_Active_Travel_Strategy.pdf
Argyll and Bute’s Local Development Plan (Proposed) –
https://argyll-bute.maps.arcgis.com/apps/MapJournal/index.html?appid=36b54584028245019f8edca605511213
How good is your place – results: Oban (Argyll and Bute Council, 2019) – https://www.argyll-bute.gov.uk/how-good-your-place-results
Appendices
28
Page 98

Page 99

Page 99

Page 100

Page 100

Page 101

Argyll and Bute Community Planning
Partnership 
Oban, Lorn and the Isles
Area Community Planning Group 
8 February 2023 
Community Planning Partnership Management Committee Update 
This briefing relates to the meeting of the Community Planning Partnership (CPP)
Management Committee which was held on 7th December 2022. The briefing is for
noting and relevant discussion. 
Summary 
HIGHLIGHTS 
Matters Arising from Area Community Planning Groups 
 An update was provided on the discussions which had taken place at all 4 Area
Community Planning Groups during the November 2022 cycle of meetings.  The
meetings had been well attended with a variety of interesting presentations given.
Of particular interest was the appointment Ryan McIntyre, MSYP to the position of
Vice Chair of the OLI Community Planning Group; the update from Stan Phillips
regarding actions to take forward to address the climate emergency and the report
by The Centre for Economics and Business Research that had been
commissioned to better understand the needs of ferry users, island communities,
and the economic and social value of Hebridean and Clyde ferry services. 
 The Management Committee noted the current situation regarding the status of
some Community Councils that have changed following the elections on 20
October 2022 and that Committee Services had been representing the Returning
Officer at associated inaugural meetings. It was noted that new Community
Councils would be invited to attend their associated Area Community Planning
Group. 
The CPP Management Committee met on the 7th December 2022 with the
meeting being held virtually. This update provides an overview of the
discussion which took place. 
Reports which were discussed at the meeting can be found here Browse
meetings - Argyll and Bute Community Planning Partnership - Management
Committee - Argyll and Bute Council (argyll-bute.gov.uk)
Page 101 Agenda Item 8

Page 102

CROSS CUTTING THEMES 
Climate Change 
Stan Philips provided a brief update report on the work of the Climate Change
Working Group (CCWG). Stan advised that work is currently ongoing to secure
funding for a Climate Change Project Manager to take forward the development of a
climate change action plan, with £90k of the required £120k secured. 
Financial Inclusion and Child Poverty 
Mandy Sheridan advised that the 3rd Child Poverty Action Plan review would be
published shortly. She noted the production of a one page graphic child friendly
version of the plan would be used for engagement, which would link to resources,
further help and information. 
The Argyll and Bute Data Cost of Living Crisis Group is looking at mapping data
factors to a geographic map, cross referenced between 2 date periods, to pinpoint
those most in need. Interest has also been submitted in the area becoming part of a
pilot project by the Improvement Service to cross reference SEEMIS data with
Council Tax Reduction claimants in Scottish Index of Multiple Deprivation zones. 
A report produced for the Coalition for Racial Equality and Rights in October,
analysed 10 of last year’s Local Authority action plans (including Argyll and Bute’s).
The report made 5 key findings - most lacked any focus on race despite links
between ethnicity and poverty and information on current action to address Black,
Asian and Minority Ethnic (BAME) child poverty, existing plans focus primarily on
gypsy/travellers, Local Authorities acknowledge poverty for BAME families yet this
did not lead to actions and issues with lack of data available at a national level are
exacerbated at local level. 
Community Wealth Building (CWB) 
Takki Sulaiman on behalf of the Argyll and Bute TSI advised that the Board have
agreed substantial funds for research to cover 3 main strands - drawing together
existing strategies, identifying best practice suitable to Argyll and Bute’s geography
and virtual food hubs . It was agreed that an advisory panel would be established
with a full proposal and draft statement for anchor institutions (including what this
means) to be considered at the next meeting. 
There was some discussion around the merit of this work, specifically that it helps to
establish the wellbeing context of the area (the diverse and different needs, not a
one size fits all). The importance of funding was also highlighted.   
Building Back Better 
Page 102

Page 103

Kirsty Moyes advised that she would be leading on work regarding the impact of the
pandemic and that an engagement exercise would soon begin that would ask
participants to discuss themes and make informed choices in their top 3 priorities.
Work is also ongoing looking at training needs in communities and reviewing the
micro grants scheme that enabled the council to distribute funding to village halls
impacted at the height of the pandemic. 
Review of ABOIP (including Results of Consultation by MSYPs) 
Rona Gold updated the Management Committee on the approach being taken to
review the Argyll and Bute Outcome Improvement Plan (ABOIP). Research by the
team has identified key priorities within Argyll and Bute (including digital, transport,
housing, climate etc.), the consultation survey will ask responders to rank their top 3
priorities from these. The survey will be open until the end of January 2023 and links
to the survey and a QR code has been sent to partners. A focus groups will be
established during the early part of spring to explore the outcomes of the
engagement which will form the priorities over the next 10 years in Argyll and Bute. 
Members of the Scottish Youth Parliament (MSYPs) engaged with youth to
determine what is important to young people. With around 900 responses received
half of young people felt that their area was run down and felt they had no
opportunity to have their voices heard. Climate concern and lack of meaningful or
appropriate mental health support are also key issues for young people. 
Digital Communities 
Iain MacInnes advised the R100 project has started successfully making live
connections across Argyll and Bute, and this will ramp up significantly over the next
few years although there are significant challenges and expense in rolling out a full
fibre programme. Iain is in contact with Openreach to engage with roads and
planning services to streamline the process and find innovative solutions to mitigate
any potential delays or disruption. 
Work continues on the Scottish Government 4g programme - there are now 3 of 9
sites live across the area to target 4g “not-spots”. This is a £1b project by the
Scottish Government, UK Government and the mobile industry (Cornerstone, O2
and EE). Iain met with the shared rural network team recently to find solutions to
accelerate the programme to build 11 remote sites in Argyll and Bute, which is to be
completed by 2024. Digital hubs have also secured £11k funding from the Island
Infrastructure Fund to develop hubs across 4 islands. 
Community Justice Partnership Annual Report 
Mary Holt spoke to the recently submitted Community Justice Annual Report, adding
that Community Justice applies to all involved in or affected by the justice system
and the Community Justice Scotland Act 2016. The local model for community
justice aims to deliver an extensive change programme centred on increasing
prevention of offending/reoffending through improved leadership and collaboration;
Page 103

Page 104

evidencing and delivering improved outcomes; learning, development and
innovation; and workforce development across multi-agency statutory partners. 
A Community Justice Outcome Improvement Plan, due to be published in April 2023,
will align with the Argyll and Bute Outcome Improvement Plan and is dependent on
the Outcome Performance Framework from the Community Justice National
Strategy and the geographic diversity in Argyll and Bute. 
Local Transport Strategy and Case for Change   
The Management Committee noted that the Highlands and Islands Transport
Partnership (HITRANS) are keen to attend a meeting in the New Year to discuss
their regional transport strategy (the timeline, what they are doing and what it
involves are detailed in the paper). 
For further information, please contact: 
Stuart McLean, Committee Manager, Argyll and Bute Council (01436) 657605
Stuart.mclean@argyll-bute.gov.uk 
Page 104