January 2023
Oban Action Plan 
for Active Travel and Sustainable Transport

Page 2

Front cover photo: 
Ben Sunderland – Adventure Oban
2

Page 3

INTRODUCTION 2
1. Executive Summary 2
CONTEXT 4
2. Purpose & Scope of the 
Action Plan 4
Sustaining Choices 4
Oban 5
Core Team 6
Anticipated Uses for the Action Plan 6
3. Planning and Transport 
Policy Context 7
National Policy Context 7
4. Planning and Transport 
Policy Context 10
Local Policy Context 10
Related Research and Projects 12
ENGAGEMENT PROCESS 14
5. Approach 14
Project Delivery – Overview 14
Project Delivery – Detailed Steps 14
Marketing and Publicity 15
Attendance and Response Information 15
UNDERSTANDING THE ISSUES 16
6. Evidence Gathering –
Community Engagement 16
Response Data 16
MAKING IT HAPPEN 17
7. Delivery Strategy 17
Key Actions Identified 17
Next Steps 21
APPENDICES 22
Appendix 1 22
The Action Plan 22
Appendix 2 28
Key National Policy Documents 28
Key Local Policy Documents 28
Contents
Oban Action Plan 
for Active Travel and Sustainable Transport
This project is supported by Smarter
Choices, Smarter Places (SCSP) and
PAS, a volunteer-led, independent and
impartial charity that helps people to
understand and influence the places
where they live, work and visit.
1

Page 4

1. Executive Summary
1.1 The Sustaining Choices project has worked
with communities across Scotland to develop
a body of evidence that demonstrates the
changes they would like to see in their area
regarding walking, wheeling, cycling, and
public transport. This is particularly timely
given the challenge of climate change and
net-zero targets, the need to reimagine the
environments we live in as a result of the Covid
pandemic, and the need to implement a green
recovery as a consequence of both. This Action
Plan articulates the evidence base that has
been gathered for the communities of Oban.
1.2 Events were organised as a partnership
between Adventure Oban, Argyll and the
Islands Coast and Countryside Trust, and
Argyll and Bute Council, with the support of
PAS. Information gathering events were held
in July and August 2022, with a further event
held in November the same year. This event
reviewed the top engagement outcomes and
started to identify next steps.
1.3 The following Anchor Statement was
developed by the local core team to define
the goal of the engagement process: “Giving
Oban residents a voice to decide what should
be done to make active travel choices more
attractive and appealing.”
Introduction
Item Topic Action
1. Active Travel Introduce more safe bike routes
including to and from schools.
2. Active Travel
Improve the signage and
lighting for active travel routes
including public footpaths.
3. Active Travel Improve pavement network
connectivity.
4. Maintenance
Tidy up the general
appearance of Oban including
greenspace, pavements and
shop fronts.
5. Active Travel
Ensure pavements meet the
needs of those with additional
access needs including
disabled people.
6. Outdoor
Space
Consider how access to
greenspace can be improved
and the quality of existing
green space maximised.
7. Active Travel Improve infrastructure 
for cycling.
8. Road Layout Install clear signage for
narrow shared-use roads.
9. Road Layout
Ensure that pedestrian
crossings are in the right place,
meet modern standards and
prioritise pedestrians.
1.4 The full list of actions (39) shared by the
community can be found in Appendix 1,
under the following topic headings: Active
Travel; Bus Routes; Community Facilities;
Maintenance; Other Comment; Outdoor
Space; Parking; Public Realm; Public
Transport; Road Layout.
1.5 The following table summarises the top 9 Key
Actions identified for the area, as prioritised
by the community.
“This Sustaining Choices project
was a great way to bring together
and catalyse lots of conversations
that have been happening in the
town around tackling the climate
crisis, making active travel the easy
option and making our beautiful
town accessible for all.”
Isla McCulloch, Trustee – 
Adventure Oban
1.6 Key Actions proposed in Oban, in 
priority order:
2

Page 5

“The Sustaining
Choices project
has worked with
communities
across Scotland to
develop a body
of evidence that
demonstrates the
changes they would
like to see in their
area regarding
walking, wheeling,
cycling, and public
transport”.
Photo credit: Ben Sunderland3

Page 6

Context
2.  Purpose & Scope 
of the Action Plan
Sustaining Choices
2.1 Sustaining Choices as a project was primarily
set up to support economically disadvantaged
and isolated communities in urban and rural
Scotland who currently underutilise, or have
poor access to, sustainable transport and
active travel opportunities.
2.2 PAS is convinced that the future of
engagement in the planning system will be a
hybrid of face-to-face and online approaches
requiring the use of open-source, locally
adaptable methods and tools, and will
increasingly be citizen-led. Sustaining Choices
aims to explore and refine this approach to
community engagement.
2.3 Sustaining Choices has been funded by the
Paths for All Smarter Choices, Smarter Places
Open Fund and delivered by PAS working
alongside delivery partners in each community.
2.4 Participating communities for this cohort of
Sustaining Choices (2022-23) were Doune 
and Deanston (Stirling); Garnock Valley 
(North Ayrshire); Glasgow East End (Glasgow);
Oban (Argyll and Bute); Ullapool, Lochbroom,
and the surrounding area (Highland);
Whiteinch and Scotstoun (Glasgow).
Doune and 
Deanston
Whiteinch and
Scotstoun
Garnock Valley
Oban
Ullapool
Figure 1: Map showing the six communities
completing Sustaining Choices
Glasgow East End
4

Page 7

Context
2.5 The goal of the project was to develop
an increased evidence base to support
sustainable transport and active travel
interventions in each location. It focuses on
communities at the margins or which don’t
have an existing evidence base, to help make
decisions to promote sustainable transport in
each area.
2.6 The following wider project outcomes were
achieved: 
•  Enabling communities to customise the 
Place Standard (PS) Tool for use in Active
Travel engagements using a simple,
replicable framework.
•  Training 25 community facilitators (citizens,
third sector and public sector workers) in
delivering their own engagement processes
using the Place Standard within their 
own communities. 
•  Establishing confidence to take other
processes forward, such as Local Place 
Plans (LPPs).
•  Developing six Active and Sustainable
Travel Action Plans for communities across
Scotland to use as an evidence base to
develop future interventions. 
2.7 At the core each plan consists of a vision for
change broken down into a series of actions.
The full list of actions can be viewed in
Appendix 1.
Oban
2.8 Oban is a town based in Argyll and Bute with
a population of approximately 8,5001. It is the
largest town between Helensburgh and Fort
William and is situated on the Firth of Lorn.
2.9 Popular with tourists, Oban features a 
number of attractions including McCaig’s
Tower. The coastal and mountainous features 
of the landscape of the area are also a draw
for visitors.
2.10 The town is based on the west of the A85.
Oban is also served by a train station, with
a number of ScotRail trains running between
Glasgow and Oban daily. Scottish Citylink
also provide connections to Glasgow as well
as Dundee (via Perth) and Edinburgh (via
Stirling). The town also provides important
ferry connections to islands including Colonsay,
Barra, Coll, and Tiree, amongst others.
1 https://www.argyll-bute.gov.uk/info/population-where-we-live
Photo credits: Ben Sunderland
5

Page 8

¯
© Crown copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023368 1:15,000
Legend
Project Bondary
0 10.5
Kilometers Oban
Context
Trust (an Argyll-wide charity with a focus on
environment and sustainability); and Becky
Hothersall (Community Development Officer)
and Douglas Grierson (Sustainable Transport
Co-ordinator) from Argyll and Bute Council.
All members of the core team attended one
or both of the community facilitator training
sessions. All members also took active roles 
in designing, delivering, and capturing 
the engagement.
Anticipated Uses for 
the Action Plan
2.17 Following a key policy goal of the National
Transport Strategy for Scotland, it is hoped
that this Action Plan will be used to embed
the implications of these proposals in spatial
planning and land use decision making 
for Oban.
2.18 The Action Plan is also intended for use by
communities and local authorities to plan
changes to services and the built environment
or be used as a basis for developing specific
proposals. This may involve being submitted as
an evidence base to help justify further funding
applications for work such as feasibility studies
or securing bike-storage infrastructure.
2 HUSS Data for Oban
Core Team
2.14 This Action Plan was produced by a
partnership of Adventure Oban, Argyll and
Bute Coast and Countryside Trust, and Argyll
and Bute Council with support from PAS.
2.15 A core team was formed out of the partnership
between the above organisations. The
core team was responsible for day-to-day
decisions about the engagement process, from
strategy design, marketing and bookings to
workshop design, selection of key actions and
community-led engagement event delivery.
2.16 The core team consisted of Isla McCulloch and
Laura Corbe, trustees of Adventure Oban (an
Oban-based charity promoting equal access
to the outdoors); Jamie Joyce, Project Manager
of Argyll and Bute Coast and Countryside
Community
Boundary 
for Oban
2.11 The Sustrans Hands Up Scotland Survey
indicated around 41% of students in 2021
got to school by walking. This was followed by
30% of students travelling by bus. Thirty one
per cent of students were driven to school.
Rates of cycling were too low to quantify
without being able to maintain the anonymity
of students. Only one out of the three local
primary schools completed the survey in 2021.
The responses revealed in 2020 that between
31% and 49% of primary school pupils were
driven to school. And between 12% and 34%
of pupils walked. Data varies between schools
and between 2014 and 2021.2
2.12 Oban is also served by the Oban Community
Council who hold meetings approximately ten
times a year.
2.13 Community Boundary for Oban:

Page 9

3.  Planning and Transport
Policy Context
National Policy Context
3.1 At a national level, policy controlling active
travel and sustainable transport will be
framed by the National Planning Framework
4 (NPF4)3 and Transport Scotland’s National
Transport Strategy 2 (NTS2)4. As of November
2022, NPF4 remains in draft form to be
laid before parliament, but no significant
changes are expected to the draft text
before adoption. Other key policy documents
governing active travel and sustainable
transport are listed in Appendix 2.
3.2 The draft NPF4 aims to deliver sustainable,
liveable and productive places across the
whole of Scotland. It states that every 
decision on our future development must
contribute to making Scotland a more
sustainable place, in part by ensuring that
all future development is accessible by
sustainable travel.
3.3 To this end, the intent of the dedicated
policy 13 on sustainable transport (p57)
is to encourage, promote and facilitate
developments that prioritise walking, 
wheeling, cycling and public transport for
everyday travel and reduce the need to 
travel unsustainably. There is a recognition
that reducing the need to travel unsustainably
is the highest priority in the sustainable
transport investment hierarchy and that the
upgrading and provision of additional active
travel infrastructure will be fundamental to the
development of a sustainable travel network
providing access to settlements, key services
and amenities, employment and multimodal
hubs (p108).
3.4 To this end, NPF4 states that proposals will 
be supported that improve, enhance or
provide active travel infrastructure, public
transport infrastructure or multi-modal hubs, 
in particular where proposals: 
i.  Provide direct, easy, segregated 
and safe links to local facilities via 
walking, wheeling and cycling networks
before occupation; 
ii.  Will be accessible by public transport,
ideally supporting the use of existing
services; 
iii. Integrate transport modes; 
iv.  Provide low or zero-emission vehicle
and cycle charging points in safe and
convenient locations, in alignment with
building standards; 
v.  Supply safe, secure and convenient cycle
parking to meet the needs of users and
which is more conveniently located than
car parking; 
vi.  Are designed to incorporate safety
measures including safe crossings for
walking and wheeling and reducing the
number and speed of vehicles; 
vii.  Have taken into account, at the earliest
stage of design, the transport needs
of diverse groups including users with
protected characteristics to ensure the
safety, ease and needs of all users; and 
viii.  Adequately mitigate any impact on local
public access routes. 
One goal of Sustaining Choices is to
communicate to developers a baseline
understanding of the needs of Oban so they
can develop evidenced proposals which meet
these criteria.
3.5 The Scottish Government also has a national
walking strategy ‘Let’s Get Scotland Walking’5
published in 2014 which aims to promote
walking as a means to improve the health of
the population.
3 https://www.gov.scot/publications/national-planning-framework-4-
revised-draft/documents/
4 https://www.transport.gov.scot/publication/national-transport-
strategy-2/
5 https://www.gov.scot/publications/lets-scotland-walking-national-
walking-strategy/pages/1/
Context
7

Page 10

Context
3.6 Core aims of this policy include:
• Create a culture of walking
•  Better walking environments 
throughout Scotland
•  Ensure easy, convenient independent 
mobility for all.
All of these aims are corroborated by
the outcomes of the Sustaining Choices
engagement exercises.
3.7 More recently, the Scottish Government
has closed a consultation for the ‘Cycling
framework for active travel’. This will build 
on the Cycling Action Plan for Scotland 
(2010 – 2020) and set out strategic 
priorities for the next 5 – 10 years.6
3.8 Scotland’s National Transport Strategy
2 articulates a vision for a sustainable,
inclusive, safe, accessible transport system,
helping deliver a healthier, fairer and
more prosperous Scotland for communities,
businesses and visitors. Its four priorities each
have three outcomes and a series of policies
to guide their implementation. Its priorities
and outcomes are designed to be used as an
evaluation framework to measure progress.
6 https://consult.gov.scot/transport-scotland/cycling-framework/
Photo credit: Ben Sunderland
8

Page 11

3.9 NTS2 acknowledges that people still face
barriers when wanting to cycle or walk to 
their destination, and that vehicles including
public transport continue to emit greenhouse
gases. It commits to addressing this.
3.10 Regarding inequalities, key issues identified by
NTS2 that need to be addressed regarding
active travel and sustainable transport include:
the risk of transport poverty for around 
1 million deprived households across Scotland
compounded by high costs for public transport
(p10); the gendered nature of access to
public transport and resultant inequalities
affecting women, as well as increased safety
fears when walking (p11); the barriers
young people face (particularly in rural
areas) regarding the availability and cost of
public transport, particularly to further and
higher education (p13); the need to meet
the travel needs of an increasingly elderly
population (p14); and the considerable
barriers to travel faced by disabled people
(p15). The policy also recognises divergent
transport and travel issues faced by different
communities across Scotland, whether urban
or rural, and according to socio-economic
factors. It states that “many of Scotland’s
most disadvantaged communities are in cities,
particularly in suburban areas. Yet, many
of them are now having to travel longer
distances to access employment opportunities
as significant numbers of jobs tend to be in city
centre locations.” (p17). But it also highlights
that people in rural areas usually have to
travel further to access services and tend to
have more limited choices when it comes to
public transport, the latter meaning that rural
households tend to drive more frequently than
urban households.” (p17).
3.11 Regarding climate change, NTS2 notes
that a key challenge is to reduce transport
impacts to help deliver the net-zero target
(p20). It admits that in terms of air pollution,
emissions of NOx from road transport are
reducing but not at the anticipated rate
(p13). It also recognises that a key challenge
involves getting people to change their travel
behaviour, both in terms of reducing demand
for travel and how they make particular
journeys, especially by encouraging walking
and cycling for short journeys.
3.12 Regarding the economy, the importance of
tourism is acknowledged but so too the impact
that increasing number of tourists, particularly
in the peak summer months, can have on
the transport system. This can particularly
impact rural communities, who are witnessing
deteriorating road networks as traffic
increases, particularly at natural and cultural
attractions, with the use of much larger and
heavier cars, caravans and motorhomes.
3.13 In terms of health and wellbeing, NTS2 notes
that road safety is critical, and that road
incidents in Scotland continue to have a
significant negative impact on individuals,
families and society as a whole. Similarly, all
people should be able to travel without fear
of crime, especially women (p37). School
children can be at risk when walking to school
from poor path infrastructure, especially
in rural areas. Over reliance on motorised
transport contributes to Scotland’s obesity
culture (p38).
3.14 NPF4 aligns itself with NTS2 in stating that
infrastructure investment should be prioritised
for locations where it will achieve the
preceding priorities and outcomes (reducing
inequalities, taking climate action, improving
health and wellbeing and helping deliver a
wellbeing economy).
Context
9

Page 12

Context
3.15 Table 2: Core NTS2 Policy Goals
NTS2 Priority Key NTS2 Policies
Reduce Inequalities Minimise the connectivity and cost disadvantages faced by those in remote rural and rural
areas, including safeguarding of lifeline services.
Ensure transport in Scotland is accessible for all by supporting the implementation and
development of Scotland’s Accessible Travel Framework (specifically disabled access to
buses and trains, improved wayfinding and signage).
Remove barriers to public transport connectivity and accessibility within Scotland.
Ensure sustainable, public and active travel access to employment, education and training.
Improve sustainable access to healthcare facilities for staff, patients and visitors.
Take Climate Action Reduce emissions generated by the transport system to mitigate climate change; reduce
emissions generated by the transport system to improve air quality.
Support management of demand to encourage more sustainable transport choices.
Facilitate a shift to more sustainable and space-efficient modes of transport for people
and goods.
Improve the quality and availability of information to enable all to make more
sustainable transport choices.
Improve our health
and wellbeing
Increase safety of the transport system and meet casualty reduction targets.
Provide a transport system that promotes and facilitates active travel choices which help
to improve people’s health and wellbeing across mainland Scotland and the Islands.
Help Deliver Inclusive
Economic Growth
Provide a transport system which enables businesses to be competitive domestically, 
within the UK and internationally.
4.  Planning and Transport
Policy Context
Local Policy Context
4.1 The Highlands and Islands Transport
Partnership (HITRANS) (one of the seven
regional transport partnerships established
to improve the planning and delivery of
regional transport) Regional Transport
Strategy Refresh (draft, May 2017) updates
the 2008-22 strategy approved by Scottish
ministers in 2008, articulating a vision to
“deliver connectivity across the Highlands and
Islands which enables sustainable economic
growth and helps communities to actively
participate in economic and social activities.”7
4.2 The strategy recognises that while many
projects need to be delivered by a concerted
effort of institutions in partnership across the
region, working with local communities to
tailor local responses is key. It states that it
will endeavour to take a locality planning and
empowerment approach to address social
isolation and access deprivation at a locality-
based level. In so doing, it aims to work with
partners and communities to plan, design and
deliver the best mix of transport for their
area to address access barriers (p42).
7 https://hitrans.org.uk/Strategy/Regional_Transport_Strategy
10

Page 13

Context
4.3 The strategy goes on to articulate a delivery
plan (p50-51). Delivery items particularly
relevant to the action points established
during Sustaining Choices include: 
•  Approaching the road maintenance backlog
on the local authority road network;
•  Developing a strategy for establishing
transport routes/corridors as visitor
attractions including the NC500;
•  Maximising the potential of the Highland
rural rail routes, including journey time
reductions, increased frequency and better
rolling stock;
•  Implementing concessionary fares, to include
community transport services and local ferry,
air and rail services where appropriate;
•  Developing comprehensive public transport
information and mapping;
•  Implementing the Low Carbon Strategy;
•  Implementing the Regional Active 
Travel Strategy.
4.4 In terms of active travel, the strategy commits
to: improving integration of cycling as part of
longer public transport journeys; improving
walking and cycling links within the region
(making the case for further financial support
towards the development of improved
walking and cycling links to and within towns
and to employment, health, leisure and
retail facilities as well as to visitor sites); the
provision of associated promotional materials,
including production of high-quality, consistent
mapping of routes; and supporting the
provision of improved walking and cycling
access at public transport interchanges
(p45/6).
4.5 HITRANS acknowledges that while progress
has been made in recent years in providing
infrastructure, facilities and information to
encourage more active travel, there is an
ongoing need to offer:
•  More extensive and better-quality
pedestrian and cycle networks;
•  Design of developments and road transport
improvements which meet the needs of
pedestrians and cyclists;
•  Information about the networks and facilities
that are available;
•  Measures to increase pedestrians’ and
cyclists’ confidence in their personal safety;
•  Convenient and secure cycle parking
facilities;
•  Segregated cycle routes; and
4.6 General information, and promotion of active
travel to continue to change attitudes. Argyll
and Bute’s Local Development Plan is in the
process of being updated. A proposed Local
Development Plan 2 currently outlines several
objectives including ‘High Quality Places’. 
Under this objective is the intention that the
next Development Plan will ‘promote the
creation of safe, inclusive and high-quality
places where people want to live, work, invest
and visit and where they are encouraged to
lead active lifestyles.’8
4.7 Proposal A in the plan refers to a Strategic
Development Framework for Oban. In
relevance to this report, the proposed
Strategic Development Framework includes
reference to ‘rationalisation of existing
land uses’, ‘improved traffic management
and parking, development of the Strategic
Transport Hub’, and ‘investigating potential
improvements to the network resilience
associated with the strategic road network.’
4.8 Policy 4 focuses on Sustaining Development
and outlines relevant aspirations including
‘utilise public transport corridors and active
travel networks’.
4.9 Policy 6 refers to Green Infrastructure
including green spaces as explored during
this engagement exercise.
8 Argyll and Bute PROPOSED LOCAL DEVELOPMENT PLAN 2
11

Page 14

Context
4.10 Active travel is directly refererenced under
‘Connectivity’ with aspirations that active
travel networks improve quality of life and
reduce resource consumption. Policy 32
proposes that:
•  Existing active travel networks and rights of
way are safeguarded and integrate with
the development;
•  Active travel routes within development are
delivered, as appropriate, ensuring that any
special mobility and safety requirements
are also addressed;
•  In all cases consideration requires to be
given to the integration of active travel
routes to adjoining areas, in particular
to the Core Path network, Public Rights
of Way, safe routes to school network,
green infrastructure and to link to the
foreshore and to public transport facilities.
The scale and nature of the proposal and
proximity of active travel routes will be
taken into account by the planning authority
in determining the requirement for such
infrastructure, which may be subject of
planning conditions or agreements.
From the review of local policy it can be
concluded that there is a place for the Oban
action plan for Active Travel within policy
aspirations for the area. Furthermore, this
plan should be able to serve as an evidence
base to inform these aspirations and act as 
a remit for change.
Related Research 
and Projects
4.11 In 2019 the local authority carried out their
own Place Standard exercise: How Good
is Your Place. This exercise was broad and
covered all aspects of the Place Standard
tool. While the Sustaining Choices exercise
also used the Place Standard tool the
focus was specifically on Active Travel, with
emphasis given to walking, cycling, wheeling,
and streets and spaces.
4.12 The 2019 Place Standard exercise recorded
scores of 4 for both Moving Around and
Streets and Spaces (with 1 meaning there is
much room for improvement and 7 meaning
that there is little room for improvement).
Commentary from the 2019 report was
echoed within this engagement exercise.
Data from the Place Standard exercise have
Photo credits: Ben Sunderland
12

Page 15

Context
been used to inform key strategic documents
for Argyll and Bute. These include informing
the consultation stage of the Argyll and
Bute Outcomes Improvement Plan 2024-34.
Consultation is currently underway on this
document, which will set out the Community
Planning Partnership’s vision for achieving
long term outcomes for communities in Argyll
and Bute. There are also plans to regenerate
Gibraltar Street in Oban, developing the
streetscape and improving access to the 
town centre.
4.13 Outwith the project boundary but still 
related to active travel, there has been
some design work conducted for an active
travel route between Dunbeg and Connel.
References to this route were made
throughout the engagement.
4.14 Further, the Isle of Kerrera is also outwith the
Oban boundary, but all the island residents
rely on Oban for their public services,
schooling, nursery, healthcare etc. The local
development trust on Kerrera has recently
brought in an e-bike scheme for residents
which has been hugely impactful in reducing
the need for short car journeys and has
improved the connectivity of the island. They
have also recently completed a significant
project in the delivery of a new road for the
island which has also been transformational
for the islanders’ connectivity and access to
Oban and the mainland.
4.15 A total of 41 classes from Oban High were
surveyed using a short online survey. Due to
time restrictions these responses were not
included in the main data analysis. However,
their feedback strongly echoed the overall
engagement exercise. Out of 695 students
from the 41 classes, 66% said that they
regularly walked into Oban. Far fewer
said that they cycled, with 7% of students
responding that they often cycled into town.
‘Too far’ was the most common reason given
by students for not walking or cycling to
school. Suggestions for improved sustainable
and active travel included: more cycle paths;
more reliable and frequent public transport;
foldable bikes in station square; access to
electric scooters; and safer pavements. The
full set of survey data can be accessed from
the project team.
This Sustaining Choices engagement exercise
chose to focus primarily on active travel with
streets and spaces being captured within 
that focus.
13

Page 16

Engagement Process
5. Approach
Project Delivery –   
Overview
The following flow chart lays out the stages of
the engagement process that was undertaken,
with each stage being explained more fully in
the following section.
Project Delivery – 
Detailed Steps
5.1  The following describes the various stages 
of the engagement process:
5.2 After an initial exercise to select interested
communities, the project began by training
community facilitators to engage their
communities in an online environment. Trainees
were a mix of local citizens and third-and
public-sector co-workers.
5.3 Community facilitators were trained in
engagement principles using an adapted
version of PAS’s SP=EED® training.9 This
was focused on online engagement and
encouraged the core teams that had formed
to begin developing engagement strategies
for their communities (marketing, stakeholders,
consultation goals). A second session then
introduced the Place Standard tool10 and 
how to use it as a structured framework of
questions, alongside training in basic facilitation
skills. The goal was to begin a learning journey
in which the community facilitators, from
whatever baseline understanding they held,
gradually grew in confidence to run their own
engagement sessions with their communities.
The communities developed their own avenues
of engagement depending on the resources
and opportunities in each place.
5.4 For each community the core team developed
a workshop plan with input from PAS. Each
community selected 3-4 high level questions
from the Place Standard tool. Two further
questions asking about people’s high-
level priorities and their suggestions for
actions to implement these were included.
These questions formed the basis of each
engagement workshop, together with an
‘Anchor Statement’ which described the goals
that each community wanted to achieve with
their engagement.
5.5 The Anchor Statement designed by the 
Oban core team was as follows: “Giving
Oban residents a voice to decide what should
be done to make active travel choices more
attractive and appealing.”
5.6 A simple question and response style
workshop based on these questions with
groups of between three and seven people
in a break-out room was generally selected
by each community. This simple approach was
taken to make the process accessible and
deliverable by community facilitators who
were often on a steep learning journey. The
‘open-source’ nature of the Place Standard
and its teachability made it ideal as an
accessible tool to be used in this format.
Details of the questions chosen by each
community are given below.
9 https://www.pas.org.uk/what-we-do/speed/
10 https://www.placestandard.scot/
Selection of
Communities
Training of
Community
Facilitators in
SP=EED and
the Place
Standard
Workshop
Plan
Development
Engagement
Strategy
Development
Data
Coding
Delivery
Summit
Finalisation
of the
Action Plan
Follow-on
Community-led
Workshops
Initial
Assessment of
Coded Data
Initial PAS-led
Engagement
Workshop
14

Page 17

Engagement Process
5.7 PAS staff and volunteers then used this
workshop plan to deliver an initial
engagement workshop in each community,
with core teams for each community
running the bookings and publicity process.
Community facilitators took the role of note-
taker in each break-out room, alongside a
PAS volunteer facilitator. In this capacity they
were able to observe how an engagement
was delivered first-hand, as the next stage
of the learning journey. PAS facilitators
also made sure to secure the numeric data
required by the Place Standard to gain the
level of improvement in a given topic area
that participants felt was required.
5.8 Each core team then went on to deliver
engagements on their own, either face to
face or online. This was the final stage of
their learning journey. They were either run
as sessions open to the general public or as
sessions tailored to specific groups, such as
young people. Some groups also chose to
create online surveys, often using Microsoft
Forms, to gather data, as an additional
helpful stream of information.
5.9 Data gathered was typed-up by scribes into
a series of statements, which were passed
back to PAS for processing. PAS staff took
the data received and thematised the data,
before synthesising this information into
an initial draft document of priorities and
actions, along with an indicative assessment
of the level of importance of each, based on
response rate.
5.10 The draft list of actions of priorities was
passed for initial assessment back to the
core team. The core teams then worked to
short-list key actions that they felt warranted
deeper attention by the community.
5.11 Lastly, an online delivery summit 
(facilitated by PAS) was held. Nine key
actions were highlighted and explored
further. Discussions in break-out groups
facilitated by PAS volunteers developed
suggestions for delivery partners and possible
first steps that could be taken.
5.12 The outputs from the delivery summits were
then integrated into the initial draft before
the finalisation of the Action Plan.
Marketing and Publicity
5.13 Engagement events were publicised by
the core team using Eventbrite, Facebook,
newsletters and direct marketing. Engagement
also happened in public spaces offering a
great opportunity to engage a broad range
of people.
Attendance and 
Response Information
5.14 Participant and/or survey response
information is given below:
11 41 classes were surveyed as groups. Data not included in the main
data analysis exercise but summarised as part of this report.
Location Event type Date No.
Engagement 1 Online 27 June 16
Engagement 2
On Street
Engagement –
Atlantis Leisure
Centre
10 August 25
Engagement 3
On Street
Engagement –
Dungallan Park
10 August 9
Engagement 4
Ad hoc conversations
with parents and
other interested
parties
Ad Hoc 17
Engagement 5 Access Panel 24 August 4
Engagement 6 Oban High School
Survey 15 September 69511
Engagement 7
Adventure Oban
Big Bike Weekend
– evening open
meeting
1 October 12
Total attendance/responses during
information gathering phase 778
Delivery
Summit PAS-led 1 November 22
15

Page 18

Understanding The Issues
Question Rating/7
Can you easily walk quality routes in Oban? 4
What do you think of cycling in Oban? 3
Are places suitable to use with a
wheelchair and a mobility aid? 3
What are people’s experiences of Oban’s
buildings, streets and public spaces? 3.5
6.  Evidence Gathering –
Community Engagement
Response Data
6.1 An extensive Place Standard exercise was
conducted across Argyll and Bute by the
local Community Planning Partnership, using
all 14 of the Place Standard criteria as part
of their ‘How Good is your Place’ community
engagement. Aware that there had been
recent engagement using the Place Standard
locally, the Oban team wished to use this
opportunity to focus and achieve detail
specifically regarding active travel.
6.2 The Place Standard was used as the basis
for the engagements held during Sustaining
Choices. In its full version, 14 high-level
questions based on different themes are
asked of groups, with follow up questions
deployed to secure more precise data. During
Sustaining Choices, in order to focus on themes
pertinent particularly to active travel and
sustainable transport, and because of the
limited time available during online sessions,
core teams were encouraged to choose
a smaller number of the Place Standard
questions to work with, as well as the final
prioritisation and implementation questions.
The core team in Oban therefore elected to
split the Place Standard question 1 (Moving
Around) into separate discussion focusing on
walking, cycling, and wheeling/mobility aids
and question 4 (Streets and Spaces).
6.3 Following the analysis of the data, improving
signage for footpaths, tidying up Oban in
an ecologically sensitive way and more safe
cycle routes emerged as the core issues that
participants wanted to see addressed.
6.4 During the workshop, participants were 
asked to grade their community in response
to each question by giving a rating on a scale
from 1 to 7. When answering together, a
group agrees the rating among themselves,
where 1 means there is a lot of room for
improvement and 7 means there is very little
room for improvement. Usually, a compass
diagram is generated to graphically display
the grading of the community according
to that group. It is important to note that
scores were only collected during the online
workshop and during the school engagement
(only walking and cycling) and not at any
other point of the engagement.
6.5 Grading still took place for the chosen
questions, and are given below, but the
compass diagram output has not been
considered appropriate because of the
limited number of core questions. The
following gradings for Oban are averaged.
6.6 Ratings by question (where 1 means there is
a lot of room for improvement and 7 means
there is very little room for improvement).
6.7 The scoring tentatively indicates some degree
of satisfaction on the points discussed with,
however, significant room for improvement.
The Key Actions and wider Action Plan point
to opportunities for such improvement.
6.8 Once aggregated and coded, all of the
responses made by participants resulted 
in a series of vision headings and aims. 
For each aim, priorities and concrete actions
for implementation have been developed.
6.9 The full list of actions (39) shared by the
community can be found in Appendix 1,
under the following topic headings: Active
Travel; Bus Routes; Community Facilities;
Maintenance; Other Comment; Outdoor
Space; Parking; Public Realm; Public
Transport; Road Layout.
16

Page 19

7. Delivery Strategy
Key Actions Identified
7.1   Following an assessment of all 39 potential actions identified during the
information gathering stage, the core team identified nine key actions to focus
on during the delivery summit.
7.2   Participants at the summit discussed the key actions in break-out groups and
decided whether a given action could be delivered as a Quick Win, or else
could be implemented in the short, medium or long term.
7.3    Further discussions then explored which community organisations or outside
organisations could support these actions moving forward. 
Each break-out group then explored appropriate first steps to implement the
key actions.
Making it Happen
17

Page 20

Making it Happen
Action Response
rate
Timescale:
Short/Medium/Long Term
Who could help First steps
Introduce more safe bike routes,
including to and from schools
Very High Long term Local authority
BEAR/Transport Scotland – trunk road authority
Developers
Adventure Oban
Users – high school & primary school students, nurseries,
cycling walking groups
Housing Associations
ACT (Argyll and the Isles Coast and Countryside Trust)
NACC (North Argyll Carers Centre)
BID (Business Improvement District)
Sustrans
HITRANS
Identify groups involved, schools, access panel, ACT,
NACC, Adventure Oban, BID
Identify & prioritise routes
Soroba Road (from housing area to the school campus),
access roads to Atlantis
Identification of ownership/responsibility of 
road network.
Focus on existing road network initially – consider easy
wins with pavement widening etc.
Ensure new housing developments consider connections.
Linking up existing off road/on road routes –
considering shared used paths
Improve the signage and lighting for
active travel routes including public
footpaths
Very High Short term Paths for All
BID (Business Improvement District)
Argyll and the Isles Tourism Cooperative (AITC)
Wee Walk Oban
Access Panel
Blind Vision
Local authority
Landowners
Housing Associations
Sustrans
HITRANS
Use Paths For All grading tool for identified routes so
you know what to expect from the path. Have a map 
in town highlighting all the marked routes.
Make sure signs are also accessible. Tourist/Alba
involvement.
QR codes for Komoot. Road signs from Soroba 
to campus.
Establish ownership/responsibilities.
Planning authority – maintenance and management.
Timeframes: Quick Win = 6 weeks; Short Term = 6 months; Medium Term = 1 – 2 years; Long Term = 3+ years
Response rates: Low = Less than 5 mentions, Medium = 5-20, High = 20-29, Very High = 30+
7.4 Key Actions: 
Timeframe and Delivery Partner overview
18

Page 21

Action Response
rate
Timescale:
Short/Medium/Long Term
Who could help First steps
Improve pavement network High Long term Local authority – consultation notices.
Retail park/private landowners
Transport Scotland
Community councils/local councillors.
Police re pavement parking
Housing Associations
Understanding responsibilities of roads departments
Identifying lines of communication/forum for when
investment is being made and when there are
opportunities to feed in.
Collating and delivering evidence base (this action
plan) to the decision makers
Identify all the pavements that need improving 
and prioritise.
Tidy up the general appearance of
Oban including greenspace, pavements
and shop fronts
High Medium term Keep Oban Beautiful, Communication with homeowners
keeping bins in better places, Transport Scotland
for main roads, BID, local authority for better (more)
placement of bins
Map bins that are an obstruction/eye sore and hazard
for those with limited mobility or vision.
Determine who owns green spaces & what would 
help volunteer groups for gardening & wildlife green
spaces etc.
Ensure pavements meet the needs of
those with additional access needs,
including disabled people
High Medium term Local authority
Transport Scotland
Housing Associations
Access Panel
Engaging with Access Panel, Blind Vision group etc.
already under way.
Ensure all singing from the same hymn sheet and support.
Consider how access to greenspace can
be improved and the quality of existing
green space maximised
High Medium term Local authority
Dungallan Park – Sailing Club/wider community/ABC
Atlantis Leisure
Glencruitten Estate/Greenshoots Garden/Hope Kitchen
Greenspace at back of Rockfield
Oban and Lorn RFC
Woodland Trust
Dunollie Estate
Keep Oban Beautiful
Paths for All
Access Panel
Fieldfare Trust
Identify who is responsible for green spaces.
Important to expand the areas readily accessible from
town so people don’t have to drive to e.g. Ganavan.
Keep up momentum on recent progress at Dungallan
Park and Mossfield sites while working on continued
improvements and investment required to these spaces.
Making it Happen
Timeframes: Quick Win = 6 weeks; Short Term = 6 months; Medium Term = 1 – 2 years; Long Term = 3+ years
Response rates: Low = Less than 5 mentions, Medium = 5-20, High = 20-29, Very High = 30+
19

Page 22

Action Response
rate
Timescale:
Short/Medium/Long Term
Who could help First steps
Improve infrastructure for cycling Medium Short term Atlantis Leisure
Rockfield Centre
Retail Park
Local Authority
Transport Scotland
Live Argyll
Housing Associations
Paths for All
Sustrans
HITRANS
Cycling Scotland
Identify areas that need bike locks as e.g. Cycling
Scotland have funding available.
Install clear signage for narrow 
shared-use roads
Medium Short term Local authority & roads authority
Transport Scotland
Police
Paths for All
HITRANS
Link up with wider campaigning groups.
Fulfil a needs assessment.
Enforcement?
Ensure that pedestrian crossings are in
the right place, meet modern standards
and prioritise pedestrians
Medium Medium term Local authority
Transport Scotland
Access Panel
Blind Vision group
HITRANS
Access Panel already moving forward with this one.
Submission of needs being made.
Making it Happen
Timeframes: Quick Win = 6 weeks; Short Term = 6 months; Medium Term = 1 – 2 years; Long Term = 3+ years
Response rates: Low = Less than 5 mentions, Medium = 5-20, High = 20-29, Very High = 30+
20

Page 23

Next Steps
7.5   The Strategic Transportation team and other partners/funders will use this
plan to better understand what are the active travel priorities in Oban and
who are the key stakeholders. The Action Plan will also serve as evidence
of support for projects. It will be very useful as supporting documentation
in funding applications and to inform community-led development such as
Community Action Plans or Local Place Plans.
7.6   Correspondence regarding the implementation of this Action Plan should be
directed to hello@adventureoban.org
Making it Happen
21

Page 24

Appendices
Appendix 1
The Action Plan
Full list of actions suggested by community during engagement events
Key Action Notes/Detail
Primary theme – Active Travel (AT)
1. Improve active travel routes for wheelchair users and buggies etc.
Ensure pavements meet the needs of those with additional
access needs
• Restrict parking by dropped kerb at exit of little lane at Millpark
•  Reducing obstacles and incorporating dropped kerbs (i.e. where the green foot bridge over the rail track comes out at Soroba & at Soroba bus
stops).
•  For example, at Station Square appropriately colour coded dimple paving should be installed at the table top feature on the vehicular approach.
Further, the shared (level) surface makes this area very difficult to navigate for those with visual impairments (e.g. guide dogs are trained to follow
a raised kerb and will stop only at an upstand).
•  Gibraltar Street (currently under consultation and earmarked for investment)
2. Improve access to multi-modal paths, including cycle routes
Improve pavement network connectivity Suggestions included:
• Pulpit Road
• Soroba Road
• Between Dungallan Park and Calmac Pier
• Rockfield Road
• Pedestrian routes to McCaig’s Tower
• Glenshellach Terrace
• Laurel Crescent to Hazeldene Crescent
• Glencruitten Road
• Route to High School
• Glenshellach to High School
• Catalina Avenue to Hayfield
• To Tesco and Homebase (across the retail park in general)
• Roads to Gallanach and Ganavan
• Reinstate old right of way out the back of Wee Ganavan
• Tesco and Gibralter Street (currently under consultation and earmarked for investment)
• Open a short cut between the ferry terminal and the station car park for pedestrians & bikes
22

Page 25

Appendices
Key Action Notes/Detail
Pavements could be widened in some areas to improve
safety and accessibility
Suggestions include widen the footway on A85 opposite Croft Road, below the Eventide home and on George Street pavements
Improve safety on key roads Rockfield Road Consider incorporating ‘pedestrian refuges’ that pedestrians can step into to allow cars to pass.
Soroba Road Full pavement connectivity for pedestrians to schools and the hospital. Explore the possibility of an offroad or ‘quiet road’ cycle path
from Glencruitten to Soroba as current road is a significant barrier to cycling south out of town at the moment.
Glencruitten Road Improved pavement connectivity and better street lighting to Mossfield area (as a minimum).
Ganavan Road Signage of shared use of the road with pedestrians and cyclists, speed limit enforcements. Explore alternative off road/path options.
Improve maintenance of paths and pavements Examples included:
• The ‘chicken run’ route
• Jacob’s Ladder
• The wooden steps on the path from Kilbowie to Ardbahn Crags
• Broken water ways at the top of Craigard Road
• Path from Glenshallach Terrace down to Tesco carpark
Police training on cycle safety
Promote Oban as an active town and active space
3. Develop a culture that promotes safe active travel
Introduce behaviour change initiative for both drivers and
cyclists to improve safety for road users
Have police patrol on bikes
4. Improve facilities for cycling
Provide opportunities to learn about safe ways to cycle Bikeability is now being delivered by Live Argyll in A&B schools, encourage uptake of this, linking with community-led bike events delivered by
Adventure Oban/ACT
Improve infrastructure for cycling At key points in town the Retail Park, Atlantis Leisure, The Rockfield Centre, the Hospital, etc.
This includes:
• Secure bike parking
• More places to lock bikes
• Charging points for e-bikes
• Parking outside of town and showers for people to cycle into work
• Water fountains
23

Page 26

Appendices
Key Action Notes/Detail
5. Develop comprehensive and safe cycle routes
Introduce more safe bike routes including to and from schools Potential locations could include:
• To high school to Rockfield primary school campus
• South Pier to Dungallan & Gallanach
•  The Oban town end of the CalMac pier has a short barrier to allow bikes to pass
The same at the other side of the terminal building would make a bike route to Pulpit Hill/Gallanch easier avoiding the ferry foot passenger area
• War Memorial to Ganavan
• Oban hill
• Pulpit hills
• Quarry road to Mossfield Drive (and other parts of Glencruitten Road)
• Ganavan Road
• From the primary school campus south out of town to Kilmore
•  Develop safer cycle route to Atlantis that avoids the Bealach-an-Righ, possible contraflow for bikes on (currently one way) Breadalbane Street 
as an option
• Remove street parking to accommodate bike lane on the one way system in town
• Explore connecting Star Brae/Stevenson Street with Market Street for bikes (thus connecting Longsdale to the high school avoiding the trunk road)
• Make Market Street two way for bikes
• Connect the bike route from “The Summit” (by Achnalaraig Stable) to Polvinister Road
Keep existing cycle paths clear and well maintained 
(including mountain bike trails)
Regular community-led cycling events like Adventure Oban’s Big Bike Weekend can bring volunteers together to support with this, especially
mountain bike trails.
Allow concession from police when cycling on pavements Particularly if roads are less safe (e.g. A85) and one-way roads e.g. Breadalbane Street
24

Page 27

Appendices
Key Action Notes/Detail
6. Develop more signage and information about routes
Improve the signage and lighting for active travel routes
including public footpaths
Potential routes include:
• The path from Kilbowie to Ardbahn Craigs
• Glencruitten woods
• To the beaches (wee Ganavan & Ganavan)*
• Corran halls to war memorial via The Witches*
• To SAMS
• Up to the Hydro
Multiple routes to McCaigs Tower (current signs point walkers up Hill Road which has no pavement and is already difficult to negotiate 
without pedestrians)
• Pulpit Hill
• Pulpit Drive to Glenmore Road
• Glenshellach to the hospital & campuses*
• Between Lynn Road and Millpark Road*
• Golf course
• Birchwood to Mossfield*
•  Develop clearer signage to the bike paths in and around town centre the regularly used footways linking George street and the Esplanade on
either side of the Regent Hotel*
* Better lighting was specifically mentioned on these routes
Improve signage at Station Square for key walking and
cycling routes from town
Develop a boardwalk from Oban to Ganavan
Primary theme – Bus Routes (BR)
7. Improve options for accessing bus travel
Trial a free shuttle bus day/week from Ganavan to
Gallanach or Soroba to help get people back on buses 
& gauge interest in routes
Review suitability of bus stops Review the location of bus stops, the seating in bus stops and also the proximity of drop kerbs, especially in Soroba
Primary theme – Community Facilities (CF)
8. Consider the use of properties and public spaces
Develop bad weather public spaces Opportunities for more community-led activities at Corran Halls, Rockfield Centre etc.
25

Page 28

Appendices
Key Action Notes/Detail
Primary theme – Maintenance (M)
9. Address issues regarding general care and maintenance in an area
Tidy up the general appearance of Oban including
greenspace, pavements and shop fronts
Includes:
• Putting away bins which, as well as an eyesore are a hazard for those with limited mobility and vision
• Clearing litter
• Improving pavements
• Improving shop fronts
• Improving the regularly used footways linking George street and the Esplanade on either side of the Regent Hotel
• Improve appearance of Jacobs Ladder
• Cutting back overgrown trees
Primary theme – Other Comment (OC)
10. Consider the development of a car club scheme
Develop a car sharing scheme or car club
Primary theme – Outdoor Space (OS)
11. Better understand, maintain, and manage green spaces
Consider how access to green and natural spaces can 
be improved
Areas include Corran Halls, Dungallan Park and the green space at the top of Craigard Road, McCaigs Tower, the Hydro, the block above 
The Rockfield Centre and an area outside Mark Dan’s
Clarify ownership of these and other areas and explore if/support local groups to take ownership
Acknowledge progress made at sites like Dungallan Park and Mossfield while keeping up momentum for further investment and improvement 
in these vital spaces
Maximise the quality of existing green and natural spaces Maximise the quality of existing green spaces and natural spaces to support biodiversity, to be safe, well maintained and provide multiple 
functions and amenities to meet the varying needs of all groups
12. Development of a skatepark or similar
Develop a skate park/pump track/skills park to build kids
confidence on bikes/scooters etc.
Primary theme – Parking (P)
13. Improve parking provision.
Better management of parking in Oban including offering
more free parking. Manage over-parking at the bottom of
Pulpit Road
This was not a focus of the study, but it was felt that it was very much an enabler
26

Page 29

Appendices
Key Action Notes/Detail
Primary theme – Public Realm (PR)
14. Consider changes which make public spaces more comfortable and accessible
Make shops and facilities more accessible by promoting
push, rather than pull doors
This makes access easier especially for those using wheelchairs or other mobility aids
Provide better seating in public places Dungallan Park, area in front of Markie Dan’s, Station Square, and going up hills
Improve green spaces by offering more amenities including
public toilets
Noted that the community campaign to keep the Ganavan toilets open over the winter has made that crucial greenspace much more accessible to
all members of the community
Install better signage to toilets at Station Square
Primary theme – Public Transport (PT)
15. Improve access to public transport
Improve public transport and make easier to use.
Advise passengers of the adventure carriage that it costs
extra to sit in the bike carriage
Primary theme – Road Layout (RL)
16. Consider changes to roads to improve efficiency and safety
Consider one way system on Oban Hill which may allow 
bus access to this area which is currently not serviced.
Refresh road markings. e.g. speed limit signs. Areas noted were at the Laurel Road and Ardconnel Road intersection
Ensure that pedestrian crossings are in the right place, meet
modern standards and prioritise pedestrians.
Specifically, reassess the location of the pedestrian crossing near the Oban Inn and consider relocating to nearer the previous location outside the
tourist office so that the footway is not blocked by people waiting to cross. Crossings which need modernised include the A85 George St, Esplanade,
Corran Halls and A816 Fire Station. Pedestrian crossing at Lidl does not comply with regulations, consider moving to opposite Dunmar Court.
Install clear signage for narrow shared-use roads. Areas include:
• South Pier to Dungallan & Gallanach
• War Memorial to Ganavan
• Oban hill roads
• Pulpit hill
• Quarry road to Mossfield Drive (and other parts of Glencruitten Rd)
Manage the volume of traffic in Oban. Consider alternative
solutions to reduce vehicle numbers travelling through and
parking in Oban i.e. Oban Ring Road
27

Page 30

Appendix 2
Key National Policy Documents
Let’s Get Scotland Walking – The National Walking Strategy (Scottish Government, 2014) – 
https://www.gov.scot/publications/lets-scotland-walking-national-walking-strategy/pages/1/
Scotland’s Fourth National Planning Framework – revised draft (2022) – 
https://www.gov.scot/publications/national-planning-framework-4-revised-draft/documents/
National Transport Strategy 2 (Transport Scotland, Feb. 2020) – https://www.transport.gov.scot/publication/national-transport-strategy-2/
National Walking Strategy (2014) – https://www.gov.scot/publications/lets-scotland-walking-national-walking-strategy/
Active Travel Task Force Delivery Plan (Transport Scotland, 2019) – https://www.transport.gov.scot/publication/active-travel-taskforce-delivery-plan/
Active Travel Framework (Transport Scotland, 2019) – https://www.transport.gov.scot/active-travel/active-travel-framework/
Transport and Poverty in Scotland, Report of the Poverty and Inequality Commission (June 2019) – https://bit.ly/3j5Lwir
Cycling Action Plan for Scotland 2017-2020 (Transport Scotland, 2017) – 
https://www.transport.gov.scot/publication/cycling-action-plan-for-scotland-2017-2020/
Scotland’s Accessible Travel Framework Our Delivery Plan for 2019-2020 (Transport Scotland, 2019) – 
https://www.transport.gov.scot/publication/scotland-s-accessible-travel-framework-delivery-plan-for-2019-2020/
Key Local Policy Documents
The Highlands and Islands Transport Partnership (HITRANS) Regional Transport Strategy Refresh – https://hitrans.org.uk/Strategy/Regional_Transport_Strategy
HITRANS Active Travel Strategy (2018) – https://hitrans.org.uk/Documents/HITRANS_ReACTS_Active_Travel_Strategy.pdf
Argyll and Bute’s Local Development Plan (Proposed) –
https://argyll-bute.maps.arcgis.com/apps/MapJournal/index.html?appid=36b54584028245019f8edca605511213
How good is your place – results: Oban (Argyll and Bute Council, 2019) – https://www.argyll-bute.gov.uk/how-good-your-place-results
Appendices
28

Page 31