Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 18 February 2025 
Dear Councillor 
South Lanarkshire Council 
The Members listed below are requested to attend a special meeting of the Council to be
held as follows:- 
Date:  Wednesday, 26 February 2025
Time:  12:30 (or immediately following the meeting of the Housing and Technical
Resources Committee, whichever is the later)
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton, ML3
0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Margaret Cooper (Provost), Bert Thomson (Depute Provost), Alex Allison, John Anderson,
Ralph Barker, John Bradley, Walter Brogan, Robert Brown, Archie Buchanan, Mathew
Buchanan, Janine Calikes, Andy Carmichael, Maureen Chalmers, Ross Clark, Gerry
Convery, Poppy Corbett, Andrea Cowan, Margaret Cowie, Maureen Devlin, Colin Dewar,
Mary Donnelly, Monique Equi, Joe Fagan, Allan Falconer, Grant Ferguson, Gladys
Ferguson-Miller, Elise Frame, Alistair Fulton, Ross Gowland, Geri Gray, Lynsey Hamilton,
Celine Handibode, Graeme Horne, Mark Horsham, Martin Hose, Cal Johnston-Dempsey,
Gavin Keatt, Susan Kerr, Ross Lambie, Martin Lennon, Richard Lockhart, Eileen Logan, Katy
Loudon, Hugh Macdonald, Julia Marrs, Ian McAllan, Catherine McClymont, Kenny McCreary,
Lesley McDonald, Elaine McDougall, Mark McGeever, Davie McLachlan, Richard Nelson,
Carol Nugent, Norman Rae, Mo Razzaq, Kirsten Robb, John Ross, Graham Scott, David
Shearer, Helen Toner, Margaret B Walker, David Watson, Kirsty Williams
1

Page 2

BUSINESS 
1 Declaration of Interests 
Item(s) for Decision 
2 Overall Position of Revenue Budget and Level of Local Taxation for
2025/2026
Report dated 6 February 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
3 - 52 
3 2025/2026 Capital Programme Update
Report dated 6 February 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
53 - 64 
4 Prudential Indicators, Treasury Management Strategy and Annual
Investment Strategy 2025/2026
Report dated 7 February 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
65 - 90 
Urgent Business 
5 Urgent Business
Any other items of business which the Provost decides are urgent. 
For further information, please contact:-
Clerk Name: Susan Somerville
Clerk Telephone: 07557323097
Clerk Email: susan.somerville@southlanarkshire.gov.uk 
2

Page 3

Report
Agenda Item 
Report to: South Lanarkshire Council
Date of Meeting: 26 February 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Overall Position of Revenue Budget and Level of Local
Taxation for 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to: 
 update the Council on the 2025/2026 Budget Settlement position, and the 3 Year
Budget Strategy. This report will also present the Revenue Budget for 2025/2026,
including the base budget allocations to Resources, for consideration and
approval.  
2. Recommendation(s)
2.1. The Council is asked to approve the following recommendation(s): 
(1) that the revised 3 Year Budget Gap of £37.584 million including the impact of
the Local Government Settlement (section 4.12) and the Use of the Loans Fund
Review /Service Concessions (section 4.7), be approved;
(2) that the 2025/2026 Budget Gap of £5.264 million (section 4.12), be noted;
(3) that the amount of savings and the level of Council Tax to be used to balance
the 2025/2026 Budget (detailed in section 5), be considered;
(4) that the options for use of one-off Investment monies in the 2025/2026 Budget
(detailed in section 6), be considered;
(5) that the assumptions detailed at paragraph 7.2, used to arrive at the Budget
presented in section 7, be noted; 
(6) that the budget figures detailed at section 7 (based on the assumptions in
section 7.2) are to be updated following agreement of the Budget, be noted;
(7) that the potential impact of savings beyond 2025/2026 (section 9), be noted;
(8) that the Revenue Budget for 2025/2026, including the base budget allocations
to Resources, as shown in Appendix 4 be approved, subject to Members’
decision on recommendations 3 and 4, and
(9) that the Council has considered and given due regard to the assessments
contained in the Integrated Impact Assessments relating to the proposals in this
report, and the outcomes of the associated public consultation (section 14), be
noted. 
3. Background
3.1. A report titled 2025/2026 to 2027/2028 Revenue Budget Strategy was presented to
the Executive Committee in June 2024.  This paper focussed on financial outlook for
the next 3 years, highlighting a Budget Gap of £77.275 million.  The Budget Gap
relating to financial year 2025/2026 was £22.355 million. 
2
3

Page 4

3.2. Subsequent to this, update papers have been presented to Members, including the
2025/2026 Revenue Budget Gap and Savings (Executive Committee, 13 November
2024), and most recently, the 2025/2026 Revenue Budget Gap and Savings – Local
Government Settlement Update (Executive Committee, 12 February 2025).  This latest
paper revised the three-year Budget Gap to £39.317 million.  This position reflects the
impact of the 2025/2026 Local Government Settlement received in December 2024. 
3.3. This report will cover the main elements of the Budget Process to date including an
update to the 2025/2026 Revenue Budget Strategy including the impact of the Local
Government Settlement (section 4), options to address the Budget Gap for 2025/2026
(section 5) and Funds Available for One-Off Investment (section 6).  Section 7 details
the Revenue Budget Summary and a proposal for a balanced budget for 2025/2026. 
3.4. Thereafter, the report will provide details of the Budget Bill and Local Government
Finance Order (section 8) and section 9 provides information on the potential impact
of savings beyond 2025/2026.     
4. 2025/2026 Revenue Budget Strategy – inc. Local Government Settlement  
4.1. The Local Government Settlement received in December 2024 allowed an update to
the Budget Gap to be reported to the Executive Committee in February 2025 (link
provided in section 3.2).  An extract is included in Appendix 1 for ease and is
summarised in sections 4.2 to 4.6.   
4.2. This February update report noted that the base grant position for 2025/2026 was a
cash increase of £53.451 million compared to 2024/2025.  However, to give a like for
like, year on year comparison, adjustments need to be made and in simple terms,
the cash increase is £53.541 million but the adjustments take this to a year on year /
like for like increase in grant of £22.626 million (3.04%).  The Council’s Budget
Strategy assumed a Grant reduction of £1.600 million in 2025/2026 therefore the
increase in grant of £22.626 million is a benefit of £24.226 million to the Budget
Strategy.   
4.3. As well as the position on Grant, there are other budget issues that require to be
considered when looking at the overall position of the Budget.  These are
summarised in Table 1 with the detail provided in Appendix 1. 
Table 1: Potential Impact on the Budget Gap 
£m £m
Local Government Settlement 2025/2026  24.226
Less: Other Budget Issues Identified   
Potential Employer National Insurance Contributions
Shortfall 
(8.000) 
Cost of Maintaining Teacher Numbers (4.200) 
Share of Additional Teachers funding  2.600 
Increase in 2025/2026 Pay Award Assumption  (5.900) 
Remove 2026/2027 Grant Assumption  (5.868) (21.368)
Potential Impact of Local Government Settlement Across 3 Years 2.858  
4.4. Table 1 shows that the impact of the Settlement on the 3-year Budget Gap is a
recurring benefit of £2.858 million (taking into account the other budget issues
referred to in section 4.3).  All of the budget issues identified impact the 2025/2026
budget with the exception of the 2026/2027 grant assumption of £5.868 million which
impacts on 2026/2027. There would therefore be the ability to use £5.868 million
4

Page 5

of budget, on a one-off basis, in 2025/2026, without impacting on the overall
Budget Gap.     
4.5. To illustrate the impact of the Settlement on each year of the Budget Strategy, Table
2 takes the Budget Gap for each year (reported to the June 2024 Executive Committee
and updated at the Executive Committee in November 2024) and shows the initial
impact of the Settlement on the Budget Gap. 
Table 2: Revised Total Budget Gap After Local Government Settlement 
2025/26
£m
2026/27
£m
2027/28
£m
Total
£m
Budget Gap 
(Executive Committee, June 2024) 
22.355 24.515 30.405 77.275
Reduction for Council Tax and Utilities  (5.900)  - - (5.900) 
Budget Gap for Information
– before Loans Fund Review / Service
Concessions
16.455 24.515 30.405 71.375
Loans Fund and Service Concessions
Savings
(6.600)  (6.000) (3.600)  (16.200) 
Use of Loans Fund Review Underspends   - - (13.000)  (13.000) 
Budget Gap after Loans Fund Review  9.855 18.515 13.805 42.175
Recurring Benefit of Settlement  (2.858)  - - (2.858) 
Revised Budget Gap Position – before
Savings and Council Tax  
6.997 18.515 13.805 39.317 
4.6. Table 2 presents a three-year Budget Gap of £39.317 million. This is the position
before any savings are taken and also makes no assumption of an increase in Council
Tax in any of the years. 
4.7. Loans Fund Review / Service Concessions: The three-year Budget Gap of £39.317
million (Table 2) includes the benefits from Loans Fund Review proposals that were
presented to Members at the November Executive Committee and will be subject to
Members’ agreement on the Budget. Details of the Loans Fund Review and Service
Concessions previously presented to Members in November 2024 can be found in
Appendix 2.  This explains how we would realise the benefit over the 3-year period
from 2025/2026 to 2027/2028.  The additional £0.661 million underspend realised in
2024/2025 (as reported to the Council’s Executive Committee, 12 February 2025)
would be available to support the Budget Strategy in 2027/2028 to 2029/2030.   
4.8. Table 1 above re-presents the position as noted in the report to Executive Committee
on 12 February 2025.   
4.9. Update to the Local Government Settlement:  Subsequent to drafting the paper to
the Executive Committee (12 February 2025), the Scottish Government’s Budget has
been progressing through the Stages of the Parliamentary approval process.  As a
result, changes are anticipated to the Council’s Settlement position. Further
information has been received in relation to funding for the increase in Employer
National Insurance Contributions.  These are taken in turn below. 
4.10. Scottish Government Grant Allocations: Following publication of the Local
Government Settlement in December 2024, the checking process has continued, and
the Scottish Government Budget is making its way through the stages of the Budget
process.  As a result, some changes have been made to the distribution of grant, as
well as some previously non-distributed monies now having an agreed distribution
5

Page 6

methodology.  These changes will not be confirmed until the Finance Order is
approved on 27 February 2025, however this paper includes what is considered to be
a reasonable estimate of what these changes will mean for the Council’s grant
allocation for 2025/2026.  As outlined at 4.2, the like for like increase in grant was
previously £22.626 million. The anticipated update to the Settlement increases this to
£23.459 million.  This is an increase of £0.833 million in terms of supporting the
Budget Gap. 
4.11. Employer National Insurance Contributions Update:  As outlined in Table 1 and
Appendix 1, the potential Employer National Insurance Contributions shortfall in
Council funding was estimated at £8.0 million. As part of the Stage One debate of the
Finance Budget Bill, it has been announced that Local Government will be provided
with their allocation of the national funding available, in order to provide some certainty
for councils for budget setting.  It is anticipated that the income from the Government
will be approximately £8.3 million rather than the £7.4 million previously estimated. 
While this still leaves a shortfall of £7.1 million, this as an improvement of £0.9
million in terms of supporting the Budget Gap.   
4.12. Table 2 shows the Budget Gap for the 3 years is £39.317 million and the Budget Gap
for 2025/2026 is £6.997 million.  Taking into account the updated information in relation
to the Scottish Government Budget (sections 4.10 and 4.11), the Budget Gap for the
3-year period is now £37.584 million.  The 2025/2026 Budget Gap is revised to
£5.264 million. Again, this is the position before any savings are taken and also makes
no assumption of an increase in Council Tax for that year.  It does assume benefit of
the Loans Fund Review / Service Concession proposals.  This is illustrated in Table 3
below. 
Table 3: Revised Total Budget Gap After Budget Bill Stage 1 
2025/26
£m
2026/27
£m
2027/28
£m
Total
£m
Revised Budget Gap Position – before
Savings and Council Tax (Table 2)
6.997 18.515 13.805 39.317
Scottish Government Grant Allocations
(section 4.10)
(0.833) - - (0.833)
Employer National Insurance
Contributions Update (section 4.11)
(0.900) - - (0.900)
Revised Budget Gap After Budget Bill
Stage 1 – before Savings and Council
Tax  
5.264 18.515 13.805 37.584 
4.13. Lanarkshire Valuation Joint Board (LVJB) – Requisition Payments: As reported
to the Executive Committee in February 2025, as part of the budget setting exercise
for the LVJB, consideration was given to the increased use of Reserves for financial
year 2025/2026.  The benefit to the Council in 2025/2026 would be £0.282 million
however, that would require to be reinstated in 2026/2027, therefore there was no
overall benefit to the three-year Budget Gap.  There is therefore the ability to use
£0.282 million of budget, on a one-off basis, in 2025/2026, without impacting on the
overall Budget Gap. 
4.14. Summary of Budget Strategy / Settlement Update: Following updates in relation to
the Scottish Government Budget (sections 4.9 to 4.11), the three-year Budget Gap is
£37.584 million.  The Budget for 2025/2026 is £5.264 million.  Options to address the
2025/2026 Budget Gap are covered further in section 5.  
6

Page 7

4.15. As covered at sections 4.4 and 4.13 there is the ability to use £5.868 million (future
year grant assumption) and £0.282 million (LVJB Requisition) on a one-off basis in
2025/2026, without impacting on the overall Budget Gap.  The utilisation of these
monies is covered further in section 6.   
4.16. Social Work Integrated Joint Board (IJB): The Council’s proposed Revenue Budget
for 2025/2026 includes a Budget for Social Work Resources. This includes budget for
the delegated services of the IJB (Adults and Older People), as well as non-delegated
services such as Children and Families. 
4.17. As Members have previously been advised in relation to 2024/2025, the actuarial
valuation of Strathclyde Pension Fund meant that the level of Employer Pension
Contributions will be reduced for 2024/2025 and 2025/2026. As is the case for the
Council, this means that for 2025/2026, the IJB’s costs for pension contributions will
remain at a level that is lower than previously budgeted for.  The total Social Work
Resources Budget for 2025/2026 will remain the same, but funds released as a result
of the reduced pension contributions for the IJB in 2025/2026 (£7.7 million) can be
used to contribute towards continued pressures in Children and Families. This
adjustment would be made between the delegated IJB budget and the Children and
Families budget, on a temporary basis in 2025/2026.  This is the same as the treatment
employed in 2024/2025. 
5. Options to Address the Budget Gap for 2025/2026
5.1. In order to address the 2025/2026 Budget Gap of £5.264 million (section 4.14),
there are options available for Members’ consideration:  
• to approve savings proposals from the savings package presented in the
2025/2026 Revenue Budget Gap and Savings (section 5.3 and included in
Appendix 3 for ease), and
• to consider the Band D Council Tax level (sections 5.4 to 5.6). 
5.2. Each of these is taken in turn. 
5.3. Savings Proposals: Budget savings totalling £10.663 million had been proposed for
Members’ consideration as detailed in the 2025/2026 Revenue Budget Gap and
Savings.  This total includes Approved Savings of £0.500 million, Management and
Operational Savings of £3.769 million along with Resource savings proposals of
£6.394 million for consideration. 
5.4. Council Tax: As previously detailed in the Budget Strategy report to Executive
Committee on 12 February 2025, each 1% increase in Band D would generate
successive amounts of £1.580 million, towards meeting the 2025/2026 Budget Gap. 
In arriving at the Budget Gap (section 4.14), no account has been taken of any
increase in Council Tax. 
5.5. Table 4 shows the impact of a range of Council Tax increases that could reduce the
Budget Gap.   
7

Page 8

Table 4: Council Tax Increases 
Percentage
Increase
Band D       
£
Annual
Increase 
£
Monthly
Increase
(over 10
payments)
£
Decrease
in Budget
Gap 
£m
0% 1300.81 - - -
1% 1313.81 13.00 1.30 1.580
5% 1365.85 65.04 6.50 7.900
10% 1430.89 130.08 13.00 15.800 
5.6. It should be noted that South Lanarkshire continues to have the lowest level of Band
D council tax in mainland Scotland at £1,300.81.  The average for mainland Scotland
is £1,428.36.   
6. Funds Available for One-off Investment
6.1. Section 4.4 notes that there is £5.868 million of budget (in relation to the grant for
future years), which can be used on a one-off basis, in 2025/2026, without
impacting on the overall Budget Gap.   
6.2. In addition, there is also the £0.282 million from the 2025/2026 LVJB Requisition
payment (sections 4.13) which can be used on a one-off basis, in 2025/2026,
without impacting on the overall Budget Gap.    
6.3. 2024/2025 Probable Outturn Underspend: In addition to the amounts above, the
Executive Committee report on the 2024/2025 Revenue Budget and Outturn (12
February 2025) noted an in-year underspend of £5.820 million in 2024/2025.  The
underspend reflected a marginal increase on the position previously reported.  The
Utilities and Council Tax position remained unchanged (£5.300 million), and there was
an additional underspend in procurement savings of £0.520 million.  It was agreed that
this £5.820 million would be set aside to support the Budget Strategy which
could include the 2025/2026 Revenue Budget.   
6.4. Taking account of these one-off monies means there is the ability for Members
to consider options for one-off investment totalling £11.970 million.  This is
available for both Revenue or Capital expenditure.  These monies are one-off
and are therefore not available for recurring investments. 
7. Total Revenue Budget Summary 2025/2026 and Council Tax  
7.1.   Taking into account the Government Grant allocated to the Council through the
Settlement and assuming no year-on-year increase in Council Tax (section 5.4),
means that the total proposed Budget for 2025/2026 is now £1,003.845 million.   
7.2. For the purposes of this paper, in arriving at this position, the following has been
assumed: 
 that the use of Loans Fund and Service Concessions savings to reduce the
Budget Gap are agreed (section 4.7),
 that savings and Council Tax have been used to balance the Budget,
 that this position includes £5.868 million (in relation to the grant assumption for
future years) earmarked for one-off investment in 2025/2026 (section 6.1),
 that this position includes £0.282 million (in relation to the LVJB Requisition)
8

Page 9

earmarked for one-off investment in 2025/2026 (section 6.2), and
 that the £5.820 million from the 2024/2025 Probable Outturn underspend remains
available for one-off investments in 2025/2026 (section 6.3). 
7.3. In the absence of any decision being taken by the Council in relation to the savings, it
is proposed that the full package of savings is taken.   
7.4. The detailed allocation of the budget to each Resource is shown at Appendix 4.  The
main figures from Appendix 4 are summarised below: 
Summary of Council Budget 2025/2026
Current
Year Base
Budget
£m   
2025/2026
Proposed
Budget
£m
1,230.515  Total Services’ Gross Expenditure 
(Appendix 4, page ii) 
1,253.246
(335.687)  Deduct: Total Services Gross Income 
(Appendix 4, page ii) 
(328.848)
894.828  Net Service Spending  924.398     
55.898
-
17.153 
-
Add: Loan Charges
Add: CFCR  
Add: Corporate Items inc. Service Concession
Add: One-off Investments
Less: 2025/2026 Savings 
50.598
-
27.963
6.150
(5.264)
967.879  Net Expenditure  1,003.845 
7.5. Table 5 shows how this 2025/2026 budget is funded, resulting in the net Sum Funded
by Council Tax, £162.343 million. 
Table 5: Net Sum Funded by Council Tax
Indicative Budget for 2025/2026 (Appendix 3) £1,003.845m
Deduct: Government Grant (£823.867m)
Deduct: Use of Reserves / Underspends in the Budget Strategy  (£17.635m)
Resultant Net Sum to be Funded Locally from Council Tax £162.343m 
7.6. The 2025/2026 net Council Tax figure comprises the 2024/2025 budget of £158.043
million, increased to reflect the additional property numbers included in the Strategy
(£1.400 million) and from the full year impact of additional new properties between
September 2024 and March 2025 (£1.900 million), as well as any further new
properties in 2025/2026 (£1.000 million).  It assumes no year-on-year increase in
Council Tax Band D (section 7.2). 
7.7. The Net Sum Funded by Council Tax (£162.343 million) is detailed in Table 6, showing
the Council Tax Budget for the year 2025/2026.  Table 6 also shows the estimated
amount of income for each £1 of Gross Council Tax.   
Table 6:  2025/2026 Council Tax Budget
Gross Council Tax 2025/2026 £185.887m
Deduct: Council Tax Reduction Scheme  (£23.544m)
Resultant Net Sum to be Funded Locally from Council Tax £162.343m  
Estimated Product of £1 Gross Council Tax at 97.125% collection £142,880
9

Page 10

7.8. Should the Council approve the budget for 2025/2026, then the Band D Council Tax
for 2025/2026 will be applied at the figure decided and necessary billing and collection
mechanisms will be set in motion.  The ten monthly Council Tax instalments will
commence in April.  Appropriate scrutiny will continue to ensure the process of
reviewing budgetary performance is continued. 
7.9. The level of Council Tax is property based.  All houses are classified into eight bands,
A to H, with band H properties paying more than three times the level of band A. The
Council’s declared tax is for band D and all other rates are fixed using the following
scale (Table 7): 
Table 7: Property Ranges and Proportion of Band D Payable
Property Ranges in South Lanarkshire for Council Tax 
Property Value
Range
Band Proportion of
Band D
Tax Payable
Proportion of 
South Lanarkshire
Property in each band
January 2025
£27,000 and under A 67% 22.52%
£27,001 to £35,000 B 78% 19.32%
£35,001 to £45,000 C 89% 16.94%
(Total A to C: 58.79%)
£45,001 to £58,000 D 100% 14.17%
£58,001 to £80,000 E 131% 13.19%
£80,001 to £106,000 F 162% 8.94%
£106,001 to £212,000 G 196% 4.55%
Over £212,000 H 245% 0.37%  
7.10. The Council’s declared tax will be at the Band D level but only around 22,700
properties (14.17%) are in band D.  Over the past few years, there has been an
upward movement in the valuation of properties.  However, approximately 58.79% of
properties still remain in Bands A, B and C, so the effect of any increase in Council
Tax is reduced by 33%, 22% and 11% respectively for most properties. 
7.11. The number of houses in the tax base for South Lanarkshire exceeds 157,700 as
advised by the Assessor for the Lanarkshire Valuation Joint Board.  From this figure,
an allowance is deducted for single person discounts, students, disabled, vacant
premises etc. to produce an estimated yield for £1 on a Band D basis at 100%
collection of £147,109. 
7.12. The Council must set an appropriate level allowing for non-collection.  Council Tax
collection rates have improved markedly in recent years due to the number of changes
initiated by the Council. 
7.13. A yield of £142,880 for £1 tax at Council Tax Band D has been used in the 2025/2026
budget (an increase on 2024/2025 due to an increase in the number of properties).  At
an assumed 97.125%, this represents a continuation of the collection rate
performance achieved in recent years.   
8. Local Government Finance Order / UK Spring Budget
8.1. As has been the case in previous years, although the Council received its grant
settlement on 12 December 2024, the level of grant may change as the Finance
Budget Bill progresses through Parliament to the Finance Order, with Stages 1 to 3 of
the Finance Budget Bill being presented to Parliament between 4 to 24 February.  The
final Debate on the Local Government Finance Order takes place on 25 February
10

Page 11

2024. Any update from this debate will be provided verbally to Members on the day of
the Council meeting. 
8.2. The Council has a statutory requirement to set its Council Tax by 11 March 2024. 
While the Council has not yet received final confirmation of its Budget as a result of
the Finance Order, it can set its Budget for the coming year using the settlement
information received to date, and it can set its Council Tax.   
8.3. As noted in section 8.1, this budget paper is based on the Local Government
Settlement received on 12 December 2024.   As the Budget Bill process continues,
there may be changes to the level of grant allocation.  However, at the date of writing
it is not anticipated that this will change the Council’s Budget position.   
8.4. For Members’ information, the UK Spring Budget is set for 26 March 2025. There is
no information available on this at present. Any impact on the Council’s financial
position will be brought back to Members. 
9. Position Beyond 2025/2026 – Impact of Savings
9.1. This paper focuses on financial year 2025/2026, however 4 savings presented in
Appendix 1 totalling £1.477 million would have an impact on future years’ financial
position:  APP01 Waste Permits (£0.875 million), CER13 Building Cleaning (£0.250
million), EDR03 Primary School Breakfast Clubs (£0.210 million) and HTR01
Sheltered Housing – Housing Support Funding to Registered Social Landlords (£0.392
million). In addition, CER10 Business Support (£0.353 million) would require
reinstatement in 2028/2029. 
10. Employee Implications
10.1. Any employee implications arising from the savings proposed in Appendix 3 will be
managed within Resources, with any staffing implications dealt with through a
combination of anticipated turnover and redeployment through SWITCH 2. 
10.2. A full analysis of the proposed savings has taken place in relation to potential areas at
risk and potential areas where employees can be redeployed to through the SWITCH2
process.  Detail has also been gathered around current vacancies and any posts filled
on a temporary basis to aid redeploying employees. 
11. Financial Implications
11.1. As detailed within this report. 
12. Climate Change, Sustainability and Environmental Implications
12.1. As agreed at the Climate Change and Sustainability Committee (20 September 2023),
a Sustainability Impact Assessment has been completed in respect of the Revenue
Budget process. This assessment was incorporated in the overall Integrated Impact
Assessment carried out on the Budget and Savings proposals and issued to members
in advance of the November Executive Committee (refer section 14).   
13. Other Implications
13.1. The financial strategy is a way of managing a number of key risks which directly impact
on the funding available to deliver Council outcomes. As detailed in the report, the
Strategy is based on a number of assumptions including pay award, and also the
finalised Government Grant allocations. 
13.2. Requirement to Set a Budget:  Under statute and internal governance rules, Council
Members have duties around setting budgets.  Failure to set a balanced budget would
have serious implications, not just for the Council but also potentially for individual
11

Page 12

members who could incur personal responsibility for failure to comply with their
statutory duty. 
13.3. Any failure to set a balanced budget would almost certainly provoke intervention by
Scottish Ministers and the Accounts Commission who have legislative powers to carry
out investigations and make recommendations which could result in Scottish Ministers
issuing binding directions to the Council. Under the Local Government (Scotland) Act
1973, special reporting processes exist (Section 102) which, if the Controller of Audit
is not satisfied with the Council’s steps to remedy such an issue, then he/she can make
a special report to the Accounts Commission on the matter. 
13.4. The Commission can then recommend that Scottish Ministers direct the Council to
rectify the issue. Individual members who unreasonably contribute to the failure or
delay in setting a budget could be ultimately censured, suspended or disqualified from
standing for election for a prescribed period of time by the Standards Commission. 
13.5. If a new budget is not set, then the Council could not enter into any new unfunded
commitments, including contracts, and spend would be restricted to meeting existing
liabilities.  As the Council’s current position is that there is a budget shortfall that
requires to be met through identified solutions, without Council agreement on a
2025/2026 budget, a gap in our budget would remain that has to be addressed before
the start of the financial year.   
13.6. Expenditure Subject to External Influences: Whilst the budget for 2025/2026 can
be set with certainty, there are areas of expenditure that are subject to external
influences which we will continue to monitor as the year progresses.  Most
significantly, this includes the impact of potential pay awards.  While the 2025/2026
Budget Strategy assumes an anticipated increase in costs for pay, the actual position
will not be known into the new financial year.  No pay deal has been agreed for
2025/2026 as yet.   
14. Integrated Impact Assessment and Consultation Requirements 
14.1. Integrated Impact Assessments prepared in November 2024 have been updated to
reflect the outcomes of the public consultation.  Integrated Impact Assessments have
been undertaken for the individual Savings and the Budget as a whole.  These initial
assessments were issued to Members to assist in the decision-making process and
have been re-issued to include the outcome of the Budget Consultation exercise
carried out across November through January 2025.  The Council has therefore
considered and given due regard to the assessments contained in the Integrated
Impact Assessments relating to the proposals in this report, and the outcomes of the
associated public consultation.  The updated Integrated Impact Assessments are
available online.  The Integrated Impact Assessment is available online. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 February 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent  
12

Page 13

Previous References
 Executive Committee, 26 June 2024  
 Executive Committee, 13 November 2024  
 Executive Committee, 12 February 2025 
List of Background Papers
 Local Government Finance Circular 10/2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Jackie Taylor, Executive Director, Finance and Corporate Resources 
Ext:  4637 (Tel:  01698 454637)   E-mail : jackie.taylor@southlanarkshire.gov.uk  
13

Page 14

Appendix 1 
Impact of the Local Government Finance Settlement and Other Budget Considerations 
(Extract from Executive Committee report on 2025/2026 Revenue Budget and Savings, 
12 February 2025) 
5. Local Government Settlement – Impact on Revenue Budget Strategy 
5.1. The Council received the Local Government Settlement on 12 December 2024.  This
formally details our grant allocations for 2025/2026.  While the Settlement is still
under review and further updates may be received which change the Council’s
position, it is the best information available at this point.   
5.2. The base grant position for 2025/2026 was a cash increase of £53.451 million
compared to 2024/2025.  However, to give a like for like, year on year comparison,
adjustments need to be made.  These adjustments remove funding from 2024/2025
that we do not yet have for 2025/2026.  The adjustments also need to reduce the
2025/2026 Grant by any new funding received which has new responsibilities or
received during 2024/2025 after the base budget was set. 
5.3. In simple terms, the cash increase is £53.541 million but the adjustments take this to
a year on year / like for like increase in grant of £22.626 million (3.04%).  The
Council’s Budget Strategy assumes a Grant reduction of £1.600 million in
2025/2026.  Taking this into account means that the increase in grant of £22.626
million is a benefit of £24.226 million to the Budget Strategy.  However, there are
other budget issues that require to be considered.   
5.4. Other Budget Issues:  There are a number of areas of uncertainty that need to be
considered alongside the Settlement, when looking at the overall budget position for
the Council. These are taken in turn below.   
5.5. Employer National Insurance Contributions:  The Council’s Employer National
Insurance Contributions are due to increase from 6 April 2025.  It is estimated that
this will cost the Council approximately £15.4 million.  This includes an allocation for
the Integrated Joint Board.  Current indications are that the national monies being
made available fall significantly short of public sector requirements.  Against the
estimated cost of £15.4 million, it is anticipated that this could result in a shortfall in
Council funding of £8.0 million.  This estimate is based on figures from the Scottish
Government stating that there is an estimated impact of £549 million increase in
costs for staff directly employed by the Scottish Public Sector against indications
from the Treasury that funding may be only £295 to £330 million.  The actual position
will not be known until into the new financial year.  To ensure we have sufficient
funding to cover costs, an additional £8 million of budget is required. 
Potential Impact on the 3 Year Budget Gap: Cost of (£8.000 million) 
5.6. Teacher Numbers:  Correspondence from the Scottish Government noted that
Local Government and the Scottish Government are committed to working together
to restore teacher numbers to 2023 levels. Funding has been provided in the
Settlement with the purpose of meeting the additional costs associated with
maintaining teachers (that is, to reflect the higher salary costs).  This should have
been windfall for the Council and is covered in section 5.7.  In addition, as we know,
the Council’s teacher numbers reduced by 65 between Census 2023 and Census
2024.  As previously reported, we believe we have mitigation in place as to why the
number of teachers reduced.  The government have not advised us on whether our
14

Page 15

mitigations are accepted.  If mitigations are not accepted, and the Council had to
restore teacher numbers to 2023 levels, this would cost the Council £4.200 million. 
Potential Impact on the 3 Year Budget Gap: Cost of (£4.200 million) 
5.7. In addition, the Scottish Government had recognised that maintaining teacher
numbers is costing Local Government more than before.  In order to support this
increase in costs, the Scottish Government have increased the funding available to
local government by £41 million (to £186.5 million) in 2025/2026.  The Council’s
share of the additional £41 million is estimated at £2.6 million and was expected to
be windfall to the council. 
Potential Impact on the 3 Year Budget Gap: Gain of £2.600 million 
5.8. The Council’s assumptions around the figures at 5.6 may be impacted by any
movement around class contact time reduction.  The Scottish Government had
pointed to wanting meaningful discussions as part of the 2025/2026 budget
agreement on reducing class contact time.   Depending on any agreements reached,
and the timing of this, extra costs to the Council could be £5.3m to bring in sufficient
additional teachers to cover reduced class contact time.  This would be in addition to
current levels of additionality teachers which are in place beyond core teacher
allocations within our school establishments. 
5.9. The funds detailed in 5.6 (£4.2 million for restoring teacher numbers) could be
required to be used to meet the extra teachers required for class contact, and there
would still be a requirement to add a further £1.1 million to the budget (in
2027/2028).  This would, however, mean that our strong mitigation for not restoring
teacher numbers, whilst still valid, could be superseded by a requirement to bring in
more teachers to cover reduced class contact time.  We will continue to update
Committee as discussions with the Government progress on this. 
5.10. Additional Support for Learning:  There was also a national amount of £28 million
to “develop” the Additional Support for Learning (ASL) workforce.  The Council’s
share is expected to be around £1.6 million.  While COSLA have advised that there
are live discussions ongoing regarding the ask against these monies, and clarity is
still required as to what that might mean, the budget position being presented in this
paper assumes that there is a requirement to spend this money on the ASL
workforce. 
5.11. Pay Award Assumptions:  The Council’s budget for 2025/2026 to 2027/2028
includes an initial pay award assumption for non-teachers from 1 April 2025 and for
teachers from mid-August 2025.  The intention of COSLA and the Scottish
Government is to get an early agreement on the Local Government Pay Award for
2025/2026, and it is suggested that we consider augmenting the Council’s budget to
allow us to be ready for that agreement.  At this point, it is uncertain whether the
Scottish Government will provide any additional funding to meet a Local Government
Pay Award as they have done in previous years.  It is proposed that the pay
assumptions are increased to contribute to the 2025/2026 Pay Award costs.  This
would cost £5.9 million for 2025/2026. 
Potential Impact on the 3 Year Budget Gap: Cost of (£5.9 million) 
5.12. Grant assumptions for future years:  The Council’s Budget Strategy assumed a
Grant increase of £5.868 million for 2026/2027.  This was based on a national
increase of £100 million in 2026/2027, as noted in the Scottish Government’s
15

Page 16

Resource Spending Review in 2022.  Recent communication with COSLA pointed to
the UK Government’s Autumn Budget which suggested frontloading of resourcing.
As we have had a better than anticipated Settlement for 2025/2026, this may mean
that we will not get the grant increase initially expected in 2026/2027.  It is deemed
prudent to no longer assume that we will see that increase and a result, the Council’s
Budget Gap for 2026/2027 would increase by £5.868 million. 
Potential Impact on the 3 Year Budget Gap: Cost of (£5.868 million) 
5.13. Table 2 summarises the potential impact of the Local Government Settlement on the
Budget Gap (section 5.1 to 5.3).  It also shows the other areas for consideration
(detailed in sections 5.4 to 5.12).   
Table 2: Potential Impact on the Budget Gap 
£m £m
Local Government Settlement 2025/2026  24.226
Less: Other Budget Issues Identified (section 5)  
Potential Employer National Insurance Contributions
Shortfall (section 5.5)
(8.000) 
Cost of Maintaining Teacher Numbers 
(section 5.6 and 5.8 / 5.9) 
(4.200) 
Share of Additional Teachers funding 
(section 5.7)
2.600 
Increase in 2025/2026 Pay Award Assumption 
(section 5.11)
(5.900) 
Remove 2026/2027 Grant Assumption 
(section 5.12)
(5.868) (21.368)
Potential Impact of Local Government Settlement across 3 Years  2.858 
5.14. Table 2 shows that the impact of the budget settlement on the 3-year budget gap
position is a recurring £2.858 million (taking into account the other implications and
assumptions detailed in sections 5.5 to 5.12).  All of the budget issues identified
impact the 2025/2026 budget with the exception of the 2026/2027 grant assumptions
(as outlined at section 5.12 - £5.868 million). There would therefore be the ability to
use £5.868 million of budget, on a one-off basis, in 2025/2026, without impacting on
the overall budget gap.     
6. Impact of Settlement on the Budget Gap  
6.1. Table 1 in this report showed what the budget gap could move to if all savings
presented at that time were accepted – this was presented to Committee in
November 2024.  Table 2 above (Section 5.13) shows that there could be a £2.858
million benefit from the Local Government Settlement on the Council’s budget gap. 
6.2. To better illustrate the impact of the Settlement on each year of the Budget Strategy,
Table 3 below takes the budget gap for each year (from Table 1) and shows the
impact of the Settlement on the Budget Gap.   This is the position before any savings
are taken.  The benefits from Loans Fund Review proposals that were presented to
Members at the November Executive Committee are also included in this table and
will be subject to Members’ agreement on the Budget.   
16

Page 17

Table 3: Revised Total Budget Gap After Local Government Settlement 
2025/26
£m
2026/27
£m
2027/28
£m
Total
£m
Budget Gap for Information (Table 1)
– before savings / Loans Fund review 
16.455 24.515 30.405 71.375
Loans Fund and Service Concessions
Savings  
(6.600)  (6.000) (3.600)  (16.200) 
Use of Loans Fund Review
Underspends  
- - (13.000)  (13.000) 
Budget Gap after Loans Fund
review 
9.855 18.515 13.805 42.175
Recurring benefit of settlement
(Table 2) 
(2.858)  - - (2.858) 
Revised Budget Gap Position –
before savings and Council Tax  
6.997 18.515 13.805 39.317 
6.3. Table 3 shows that the budget gap over the three years of the strategy would be
£39.317 million.  This is before any savings are agreed for 2025/2026, or before any
increase in Council Tax.    As covered at section 5.14, as the proposal to remove the
2026/2027 grant assumption (£5.868 million) impacts in 2026/2027, this means that
there is the ability to use £5.868 million of budget, on a one-off basis, in 2025/2026,
without impacting on the overall Budget Gap. 
6.4. Council Tax: The figures above do not take account of any assumed increase in
Council Tax. Section 7 provides further information on Council Tax. 
6.5. 2024/2025 Utilities and Council Tax Underspend:  The Executive Committee of 13
November 2024 also noted the in-year underspend in the Pay Award consequential
monies from the UK Government.  This is being used to mitigate future year pay
award shortfalls across the three-year Strategy period.  It also noted the £5.3 million
of underspends from Utilities and Council Tax in 2024/2025, and that these were to
be considered alongside the Settlement when it is received.  As the 2024/2025
Probable outturn has now been completed (presented in a separate report to this
Committee), the £5.3 million has now increased to £5.8 million.  The figures in Table
3 do not include the use of these 2024/2025 underspends as there is no overall
benefit across the 3 years:  any use of these Reserves would be one-off, with
reinstatement required in the following year.   
6.6. Lanarkshire Valuation Joint Board (LVJB) – Requisition Payments:  As part of
the budget setting exercise for the LVJB, consideration was given to the increased
use of Reserves for financial year 2025/2026.  The benefit to the Council in
2025/2026 would be £0.282 million however, that would require to be reinstated in
2026/2027, therefore there is no overall benefit to the three-year Budget Strategy
gap.  There is the ability to use £0.282 million of budget, on a one-off basis, in
2025/26, without impacting on the overall Budget Gap. 
6.7. Packaging Extended Producer Responsibility (Packaging EPR): The
implementation of Packaging EPR will shift the cost of collecting, managing, recycling
and disposal of household packaging waste from the public purse to producers. 
Correspondence from the Scottish Government and the Department for Environment,
Food and Rural Affairs (DEFRA) refers to an amount of £7.8 million of funding for the
Council into 2025/2026.  
17

Page 18

6.8. While the letter states the value of funding to the Council, there are a number of
unknowns regarding the scheme and its rollout: there is a significant degree of
uncertainty regarding the value of funding allocated to the Council as this will be
reviewed at least twice before final confirmation is received.  In addition, the scheme
administrator has only recently been announced and while the aim of the scheme is
to maximise recycling of packaging materials, the additional investment required to
achieve the aims of the scheme have not yet been concluded.  Due to this uncertainty,
it is deemed prudent that we do not include this indicative sum at this point in the
Budget considerations. 
18

Page 19

Appendix 2 
Cross-Cutting Review:  Loans Fund and Service Concessions 
(Extract from Executive Committee report on Revenue Budget and Savings, 
13 November 2024) 
1. Introduction
1.1. As reported to the Executive Committee in June 2024, as part of the Transformation
programme to help address the £77.275 million Budget Gap over the next 3 years, the
Council has embarked on a number of cross-cutting reviews. One of these reviews
looks at the Council’s Loan Charges budget, and the repayment of debt through
Service Concessions.   
1.2. Loan charges form a significant element of the Council’s revenue budget. How these
charges, in particular the repayment of debt, are calculated and accounted for can
have a material impact on the amounts charged to the Council’s Revenue Budget. 
1.3. The review has looked at two areas where there is some flexibility in how we account
for loan charges / debt repayments, and that could lead to savings to contribute to the
Revenue Budget Strategy going forward: 
1. Loans Fund Review / Additional Voluntary Repayments
2. Service Concessions (PPP Contractor Payment) and IFRS16 (Statutory
Charge for Repayment of Debt) 
1.4. Sections 2 and 3 will focus on the Loans Fund Review and the options available in
relation to Additional Voluntary Repayments.  This is detailed in Sections 2 to 3. 
Section 4 considers the options available in relation to Service Concessions payments
as a consequence of implementing IFRS16.   
2. Loans Fund Review/Additional Voluntary Repayments
2.1. In 2019 a review of the loans fund was carried out which looked at how the borrowing
from the Loans Fund to fund the capital programme was repaid. By extending the
period over which the borrowing was repaid and applying this revised approach, it was
identified that £68 million of loans fund advances had been repaid earlier than it would
have been under the revised approach.  In addition to the historic overpayment, by
repaying advances over a longer period of time, the annual charge in future years was
also reduced with a further potential benefit of £198 million to 2046/2047 in reduced
principal repayments. 
2.2. While the Council could repay the advances over a longer period of time, this meant
that additional interest costs would be incurred as the debt outstanding would remain
higher for longer.  An alternative approach was identified that would allow the Council
to limit the benefit to the £68 million that had been historically overpaid. This approach
involved making additional voluntary repayments of debt totalling £198 million which
in turn reduced the additional interest costs.  This was the approved position in June
2020 (Executive Committee). 
2.3. Given the further budget pressures being faced by the Council in the coming years,
this paper revisits the additional voluntary repayments with a view to lowering the loan
charges spend across the medium term which means savings can be made.  The
impact on interest payments has also been considered as part of this review. 
19

Page 20

2.4. It is noted that 5 years on from the start of the original Loans Fund Review, and
following changes to the phasing of borrowing for the General Fund capital
programme, the profile of additional voluntary repayments has changed from that
reported to Committee in 2020.  The planned voluntary repayments now total £193.555
million from 2025/2026 to 2046/2047.   
2.5. The voluntary repayments are used by the Loans Fund to repay external debt, so not
making these repayments means that the Council’s external debt will not be repaid as
quickly as it would have been, resulting in additional interest costs. The additional
interest costs have been calculated as £185.637 million over the period from
2025/2026 to 2061/2062 and these are included in the Strategy proposed.  The profile
of these interest repayments is provided in Annex A (column c).  For information, the
interest costs total £185.637 million across the years 2025/2026 to 2061/2062, and
these are included in the Strategy proposed.  At today’s prices, this equates to £97
million. 
2.6. By no longer making these voluntary repayments, then the costs incurred by the
Council will be lower.  The result of this is that we will underspend in our Loan Charges
budget.  The in-year underspends across years are also shown in Annex A (Column
a).  This takes account of the recalculated loan charge payments, the removal of the
additional voluntary repayments and importantly, the impact of the removal of the
voluntary repayments on the interest costs incurred (as referred to in 2.5).  The
recalculations present an underspend of £18.849 million in 2025/2026 but this
underspend decreases into future years to accommodate the profile of debt
repayments and consequent interest charges, as shown in Annex A.   
2.7. The option to remove voluntary repayments is only available from 2025/2026 onwards
due to the fact that they were originally programmed to start in that year.   
3. Loans Fund Review / Additional Voluntary Repayments – Savings Options
3.1. As noted in Section 2.6, Annex A shows the savings achievable in each financial year.
However, as noted, while the savings / underspend starts at £18.849 million in
2025/2026, the level of savings each year thereafter reduces over time therefore, we
cannot take this higher level of savings on a permanent basis.  Instead, it is proposed
that we take a 3-year view of the savings achievable from the review, given the
magnitude of the savings required, and we spread the benefit over the 3 years from
2025/2026 to 2027/2028. 
3.2. It is therefore proposed that a total saving of £14.600 million be taken and spread
across 2025/2026 to 2027/2028.  The proposed phasing of these savings is shown in
Table 1 within Annex B, spreading the savings across the Medium-Term Budget
Strategy.  By smoothing the savings across the years, it avoids having to reinstate
budget into the later years of the Medum-Term Strategy.   
3.3. These budget reductions of £14.600 million would help address the Budget Gap
across the years 2025/2026 to 2027/2028. This would have no impact on services
delivered. 
3.4. There will still be a requirement to increase loan charge budgets after 2027/2028 (as
shown in Table 1, Annex B), but the benefit of £14.600 million can be taken over the
3 years of the Revenue Budget Strategy.  Reinstatement of the budget is required in
2028/2029 (£1.0m) and 2029/2030 (£0.5m) however this can be included in future
years budget plans and will be offset by anticipated benefits from Service Concessions
(as outlined in Section 4). 
20

Page 21

3.5. To reiterate, these figures include the additional interest costs incurred from not
repaying the voluntary repayments (as referred to in Section 2.5).  The interest costs
total £185.637 million across the years 2025/2026 to 2061/2062. 
4. Service Concessions/IFRS16 (Statutory Charge for Repayment of Debt)
4.1. In 2022/2023, the Council applied flexibilities regarding how the debt element of PPP
payments are charged to revenue.  These flexibilities arose from accounting
regulations which removed the restriction that we have to account for these costs
over the life of the contract rather than the life of the asset.  This is different from how
we account for other non-PPP transactions.  By charging debt to the Revenue
Budget over the life of the asset, rather than the contract period, significant one-off
retrospective savings were realised, as well as permanent budget savings.   
4.2. IFRS16 is an accounting standard that councils have to implement in 2024/2025.  The
consequence is that there are changes in how the Council accounts for leases in its
Annual Accounts.  This standard also applies to how we account for the Council’s PPP. 
By applying this standard, there is a reduction in what is charged to the Revenue
Budget over the medium term, allowing further savings to be made. 
4.3. Officers from Finance Services have been working with the Council’s Treasury
Management advisers to quantify the impact of this change in accounting treatment.   
4.4. Based on the work done to date, estimated savings of £1.600 million have been
identified across the 3 years of the Budget Strategy from 2025/2026 to 2027/2028. 
This work will continue to be developed. 
4.5. Savings:  It is proposed that the budget reductions of £1.600 million, which are the
result of a change to accounting guidance, are used to help address the Council’s
Budget Gap across the years 2025/2026 to 2027/2028.  There are also additional
savings available in 2028/2029 (£1.3 million) and 2029/2030 (£1.7 million).  The profile
of the savings across the coming years is shown in Table 2 within Annex B. 
5. Loans Fund Review – In-Year Underspends 
5.1. As the proposal is to take the Loans Fund Review savings across the 3 years of the
Medium-Term Budget Strategy (2025/2026 to 2027/2028), there will also be in-year
underspends that could be used to further support the Budget Strategy itself.  Table 5
within Annex B shows the in-year underspend resulting from the review and removes
the proposed savings from the review (sections 3.2 and 4.5).  This leaves a resultant
underspend each year. 
5.2. In addition, work on the review and on the loan charges projection for the current year
has identified an in-year underspend of £7.246 million in 2024/2025.  This is the result
of a reduction in repayments of external debt due to the timing of the original Loans
Fund Review being implemented, and also reflects reduced costs as a result of the
timing of borrowing required for various projects within the Capital Programme. 
5.3. The total underspend available across the 4 years (2024/2025 to 2027/2028) is
£26.495 million.  There is the option to use these underspends to support the Budget
Gap, on a one-off basis across the years, being mindful of the fact that the use of
these underspends needs to be reinstated into the next year.  These underspends
are illustrated in Table 5 within Annex B and total £26.495 million across the years
2024/2025 to 2027/2028. 
5.4. Table 6 within Annex B shows how we can use £13.000 million of the loan charges
underspends to assist in managing the Budget Gap across the 3 years of the Budget
21

Page 22

Strategy.  This reduces the Medium-Term Budget Gap to £48.075 million. 
5.5. Assumptions have been made on the base Budget Gap for 2028/2029 to 2030/2031 for
illustration purposes. Table 7 in Annex B shows the impact of reinstating the use of
£13.000 million of the underspend in the medium term, and how that can be managed in
the next years, until 2030/2031, by using the remainder of the loan charges underspend
(£13.495 million).  Table 7 shows that the Budget Gap remains the same before and
after the use of the loan charges underspends.  The benefit of these underspends is to
smooth the savings requirement across years. 
6. 2028/2029 and Beyond
6.1.   As outlined in Section 3.4, reinstatement of the budget of £1.500 million is required in
2028/2029 and 2029/2030 from the Loans Fund Review / Additional Voluntary
Payments. 
6.2. It is proposed that this is offset by the additional savings of £3.000 million available in
2028/2029 and 2029/2030 from the accounting treatment of Service Concessions
(IFRS16) (section 4.5). 
6.3. This takes the total benefit over the five-year period to £17.700 million.  This is
illustrated in Annex B, Table 3. 
7. Financial Implications
7.1. The financial implications of the Loans Fund review have been identified in Sections 2
to 6 and summarised below: 
• Savings of £14.600 million from the loans fund review are proposed across the 3-
year period of the Budget Strategy (2025/2026 to 2027/2028) (Section 3.2).  This
reduced the Budget Gap in 2025/2026 by £5.500 million. 
• The work on Service Concessions is detailed in Section 7 and the financial impact
has identified savings of £1.600 million across the period 2025/2026 to 2027/2028
(Section 4.5).  This reduces the Budget Gap in 2025/2026 by £1.100 million. 
• Additional in-year underspends from the Loans Fund Review total £26.495 million
(detailed in section 5). There is the option to use the in-year underspends from the
Loans Fund Review to help address the Budget Gap, on a one-off basis across
the years, being mindful of the fact that the use of these underspends needs to be
reinstated into the next year.  It is proposed that £13.000 million is used to help
address the Budget Gap in 2027/2028.  This needs to be restated in 2028/2029. 
7.2. The overall implications of the proposals on the current Budget Gap for the years
2025/2026 to 2027/2028 are summarised in Table 1.   
22

Page 23

Table 1 – Impact on the Budget Gap 2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
Total 
£m
Original Budget Gap 
2025/2026 to 2027/2028
(June 2024, Executive Committee)
22.355 24.515 30.405 77.275
Less
Council Tax and Utilities 
(Table 1 / Section 4.8) 
5.900  -  -  -
Revised Budget Gap 16.455 24.515 30.405 71.375     
Less:  Loans Fund and Service
Concessions Savings 
(Annex B, Table 4)
(6.600) (6.000) (3.600) (16.200)     
Use of One-off Underspends - - (13.000) (13.000) 
7.3. Table 1 shows that following the review, the Loans Fund and Service Concession
savings could help address the Revised Budget Gap across the 3 years of the
Medium-Term Budget Strategy and the Budget Gap over these 3 years could be
reduced to smooth the requirement for savings.  The majority of this saving is
generated by the Loans Fund Review and the removal of the voluntary repayments –
this option is only available from 2025/2026 onwards due to the fact that the Additional
Voluntary repayments were originally programmed to start in 2025/2026.  This
proposal would not any impact on service delivery. 
7.4.   Beyond the period of the Medium-Term Strategy, Table 2 shows how the remainder
of the £26.495 million of the underspends could be used to manage the Budget Gap
in the medium term highlighting that the estimated total Budget Gap is the same before
and after the use of the loan charges underspends.    
Table 2 – Beyond 2027/2028  2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
2030 /
2031
£m
Revised Budget Gap (Table 1)
(later years for Illustration) 
30.405  10.000 10.000 10.000
Less 
Loans Fund Review / Service
Concessions (IFRS16)
(3.600)  (0.300) (1.200) -
Budget Gap after Loans Fund
and Service Concessions 
26.805  9.700 8.800 10.000
Use of Underspends (13.000)  (9.000) (4.495) 0.000
Reinstatement of Underspends -  13.000 9.000 4.495
Budget Gap after Use of
Underspends
13.805  13.700 13.305 14.495 
7.5. Table 2 shows how we can use the underspends to help address the Budget Gaps in
the years beyond the Medium-Term Strategy, and again, smooth the requirement for
savings.   
7.6. Net additional savings in 2028/2029 and 2029/2030 from both the Loans Fund Review
and Service Concessions of £1.500 million, bring the total benefit over the five-year
period to £17.700 million (Section 6).  Section 6 notes that reinstatement of the loan
charges budget will be required, however, this can be managed by additional savings
from Service Concessions.  
23

Page 24

24

Page 25

Annex A 
Loan Charge Projections Across Years 
(Over)/Under
Spend
(inc. Additional
Interest) 
(a) 
£m
Saving/
(Negative Budget
Impact) 
(b) 
£m 
Additional
Interest 
(included in
column a) 
(c) 
£m
2025/2026 18.849 18.849  0.234
2026/2027 17.017 (1.832)  0.723
2027/2028 14.583 (2.434)  1.244
2028/2029 13.594 (0.989)  1.805
2029/2030 13.046 (0.548)  2.376
2030/2031 11.927 (1.119)  2.939
2031/2032 10.592 (1.335)  3.483
2032/2033 8.977 (1.615)  4.021
Interest from 2033/2034 to 2061/2062 168.812
Total Interest 185.637 
25

Page 26

Annex B
Table 1:  Loans Fund Review – Proposed Savings 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
Loans Fund Review 5.500 5.500 3.600  (1.000) (0.500)
Cumulative Savings 5.500 11.000 14.600  13.600 13.100 
Table 2:  Service Concessions – Proposed Savings 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
Service Concessions 1.100 0.500 -  1.300 1.700
Cumulative Savings 1.100 1.600 1.600  2.900 4.600 
Table 3 – Total Savings from Review (Loans Fund and Service Concessions) 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
Loans Fund Review 5.500 5.500 3.600  (1.000) (0.500)
Service Concessions 1.100 0.500 -  1.300 1.700
Total Savings 6.600 6.000 3.600  0.300 1.200
Cumulative 6.600 12.600 16.200  16.500 17.700 
Table 4 – Impact of the Review Savings on the Budget Gap 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
Total 
£m
Original Budget Gap 
2025/2026 to 2027/2028
(June 2024, Executive Committee)
22.355 24.515 30.405 77.275
Less
Total Loans Fund and Service
Concessions Savings (from Table 3)
(6.600) (6.000) (3.600) (16.200)
Resultant Budget Gap
(after Loans Fund and Service
Concessions Savings)
15.755 18.515 26.805 61.075 
26

Page 27

Annex B (contd)
Table 5:  Loans Fund Review – In-Year Underspends 
2024 /
2025
£m
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
In-Year Underspend from Loans
Fund Review (Annex A, Column a)
7.246 18.849 17.017 14.583
Less: Loans Fund Review Savings for
Budget Strategy (Table 1)
- 5.500 11.000 14.600
Resultant In Year Underspend 7.246 13.249 6.017 (0.017)
Cumulative Underspend 7.246 20.495 26.512 26.495 
Table 6 – Use of Underspends to Support the Budget Gap 2025/2026 to 2027/2028 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
Total 
£m
Resultant Budget Gap 
(Table 4)
15.755 18.515 26.805 61.075
Use of Underspends -  (13.000) (13.000) 
15.755 18.515 13.805 48.075 
Table 7 – Use of Underspends to Support the Budget Gap Beyond 2027/2028 
Table 2 – Beyond 2027/2028  2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
2030 /
2031
£m
Original Budget Gap (June 2024)
(For Illustration) 
30.405  10.000 10.000 10.000
Loans Fund Review / Service
Concessions
(3.600)  (0.300) (1.200) -
Revised Budget Gap 26.805  9.700 8.800 10.000
Use of Underspends (13.000)  (9.000) (4.495) 0.000
Reinstatement of Underspends -  13.000 9.000 4.495 
13.805  13.700 13.305 14.495 
27

Page 28

Appendix 3 
Approved Savings 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
APP01 Facilities,
Waste and
Grounds
Waste Permits 
The Executive Committee, on 26 June 2024, approved the proposal to introduce a charge for the
uplift of burgundy bins containing garden waste. 
The cost of the permit is £45 per annum and will allow a resident to present one burgundy bin
containing garden waste on each scheduled collection day until the end of that financial year. 
Net income, after deducting costs of the Service, is £0.500 million in 2025/2026 with an additional
income in 2026/2027 of £0.875 million. 
- 0.500 
Total Approved Savings  -  0.500
28

Page 29

Management & Operational Savings 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
M&O01 All Procurement 
This proposal sees efficiencies and savings generated through a focus on demand management
opportunities (buying less or not at all), alternative product specifications and new routes to market. 
Opportunities have been identified for inclusion in the 2025/2026 budget strategy outlined below: 
The total savings proposed for 2025/2026 is £0.955 million. 
- 0.955
M&O02 All Overtime 
Resources have been working in conjunction with Personnel Services to prepare action plans to
meet the outcomes associated with reducing overtime across the Council. 
Through removing enhanced overtime expenditure and reducing and containing plain time overtime
expenditure, savings of £0.364m can be realised in 2025/2026.  This is summarised across
Resources in the table below. 
Resource / Service  2025/2026 
Saving
Community and Enterprise £0.125m
Finance and Corporate £0.030m
Housing and Technical  £0.150m
Social Work  £0.059m
Total £0.364m 
- 0.364
29

Page 30

Management & Operational Savings 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
M&O03 All Management Structures 
This proposal considers spans of control across all Resources in order to review the number of
management and supervisory posts. This is to ensure consistency in the balance of managers and
front-line staff as well as to identify and remove any anomalies with direct Grade to Grade reporting. 
Services were identified which currently operate with lower spans of control than what is
recommended by the Preferred Operating Model. In these service areas, efficiencies can be
realised by aligning more closely with the model, while also ensuring consistency across Resources
in terms of management workload and responsibility.  This will realise savings totalling £1.000m in
2025/2026. 
It is anticipated that this will affect 16.85 FTE. 
16.85 1.000 
M&O04 Property Reduce Corporate Accommodation
The closure of Montrose House has allowed savings of £0.250m to be realisable in 2025/2026 from
property costs associated with the building. 
In addition, efficiencies will be realised in 2025/2026 from the lease agreement with NHS for
occupation of Brandongate, Hamilton. A saving of £0.112m is achievable from the lease terms
including income from a share of rent, service charges and cleaning costs. 
The total savings proposed for 2025/2026 is therefore £0.362 million. 
- 0.362
M&O05 All Salary Sacrifice Shared Cost Additional Voluntary Contributions (SCAVCs) 
Local Government Pension Scheme (LGPS) members are currently permitted to contribute to a
standard Additional Voluntary Contribution (AVC) scheme and receive Income Tax relief on their
contributions. 
An employer can also decide to contribute to the employee’s AVC arrangement, this is known as a
shared cost AVC (SCAVC). There are financial benefits to introducing a salary sacrifice SCAVC
- 0.088
30

Page 31

Management & Operational Savings 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
scheme as both the employee and the employer make savings on National Insurance (NI)
contributions. 
Based on the current number of employees who pay AVCs, there will be a net saving to the Council
of £0.088m per annum from adopting the scheme from 2025/2026. 
M&O06 All South Lanarkshire Leisure and Culture Utilities 
Recent information has suggested a downward trend in prices in 2024/2025.  The Council is a
member of the buying consortium who purchase wholesale energy in advance, on behalf of
ourselves and other public sector bodies. The price indications specifically for electricity purchased
for the next couple of years indicates further price reductions beyond that assumed for 2024/2025. 
This allows an estimated saving of £1.000 million in 2025/2026 in relation to South Lanarkshire
Leisure and Culture utility costs. 
- 1.000 
Total Management & Operational Savings  16.85  3.769
31

Page 32

Savings for Approval 
Council Wide 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
COR01 All Council Charges 
The cross-cutting review of Council charges has looked at all charges made by the Council and the
basis for their charge, specifically those not recovering their costs.  It has also, considered whether
the increase in our charges over recent years has kept in line with the trend in inflation.   
This exercise identified that where an inflationary rise has been applied over the last 5 years this
has not followed actual UK inflation.  In general, we have applied around 16.8% whereas inflation
across the UK has been closer to 33.6%.  To bring us in line approximately 14.4% would be
required to be applied in a single year.  It is therefore proposed to apply an inflationary increase of
14.4% across all charges that are not statutory or covered by other reviews plus 1.5% year on year
inflation to calculate new charges for 2025/2026.  This would generate £0.190m of additional
income. 
In addition, it is proposed to apply an inflationary increase across parking tariffs from 80p to £1 for
the lower charge and rising by an equivalent percentage increase across longer stay parking tariffs
and season tickets. This would generate £0.185m of additional income. 
The total savings proposed for 2025/2026 is therefore £0.375 million. 
- 0.375 
Total Council Wide  -  0.375
32

Page 33

Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
CER01 Enterprise and
Sustainable
Development 
Christmas Events (Re-presented) 
This option would see a budget reduction due to removing the Christmas Switch-On events. The
Council currently supports six switch-on events across South Lanarkshire, in Hamilton, East
Kilbride, Rutherglen, Cambuslang, Lanark and Carluke. This proposal would remove the events
programme. There would be no council provided Christmas events in town centres.   
This savings proposal would remove all the budget for this area (£0.045m). 
- 0.045
CER02 Enterprise and
Sustainable
Development
Christmas Trees and Lighting (Re-presented) 
The proposal is a budget reduction to rationalise trees and festive lighting to eight main
geographical areas:  Hamilton, East Kilbride, Rutherglen, Carluke, Blantyre, Cambuslang, Larkhall
and Lanark. 
This savings proposal would remove all the budget for this area (£0.037m). 
- 0.037
CER03 Grounds Weedkilling (Re-presented) 
This proposal will reduce weedkilling from 2 applications to one per annum. 
The reduction applies across all current areas of hardstanding, shrub beds and grass edges.  There
will be greater weed growth over the growing season. 
This will affect 15 employees (14.5 FTE). 
14.5 0.510
CER04 Grounds Support for Gala Days (Re-presented) 
This proposal would see the removal of grounds staff supporting gala days.  This includes costs of
bunting and the costs of overtime for staff supporting gala days.   
- 0.055
33

Page 34

Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
CER05 Streets Mechanical Sweeping – Small (Re-presented) 
There would also be a reduction in the number of smaller Swingo vehicle used on footpaths, shop
fronts and town centres and some roads within housing areas and industrial estates. (27%
reduction in vehicles).  This will mean less street sweeping.  Remaining vehicles will be targeted to
high footfall areas.   
Smaller fleet will mean means less resilience in ad hoc / urgent response situations. 
This will affect 6 employees (6 FTE). 
6.0 0.285
CER06 Streets  Litter collection (Re-presented) 
This proposal would see a 10% reduction in litter picking and bin emptying.  The saving would
include staffing and fleet vehicles.  Bin infrastructure is being looked at to reduce numbers of bins
but increase capacity.   
This will affect 10 employees (10 FTE). 
10.0 0.255
CER07 Roads,
Transportation
and Fleet
Precautionary Footway Gritting 
We currently treat ‘precautionary’ footways ahead of freezing conditions. 
Beyond that our approach is reactive, treating ‘accessibility’ and ‘other’ routes during periods of
extended severe weather as resources allow. 
Currently, we treat 3.38% of our footways on a precautionary basis and this proposal would involve
a cessation of the current practice to instead involve reactive footway treatment only in response to
severe conditions. There would be potentially increased risks of accidents occurring due to potential
falls on slippery pavements.   
- 0.300
34

Page 35

Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
It is understood that several other Scottish local authorities take this approach including
Renfrewshire, North Ayrshire, Inverclyde, Moray, Argyll & Bute, West Lothian, Fife, and Perth &
Kinross. 
CER08 Roads,
Transportation
and Fleet
Carriageway Gritting 
The Council’s core carriageway gritting service treats our ‘precautionary’ routes prior to the forecast
onset of freezing conditions or snow. 
Currently, low season routes are treated during winter low season (normally October and April), with
more comprehensive high season routes being treated from November to end of March. High season
routes equate to circa 49% of the road network and low season routes equate to circa 30% of the
road network. 
The Scottish average is 45% and indicates that we presently deliver an above average level of
service.   This proposal would be to move to the Scottish average. 
A change to treating only the Scottish average during high season would inevitably see some roads
removed from our routes leading to an associated risk of increased accidents, however we would still
be treating 45% of the network (a reduction of 4%). 
- 0.130
CER09 Roads,
Transportation
and Fleet
Grit Bins 
The provision of grit bins has a limited effectiveness on snow and ice clearance, however, to facilitate
self-help we provide over 3,000 grit bins across our communities.   
In severe weather these bins empty quickly and demands for refilling peak. Refilling exercises are a
substantial operation and frequently require successive visits across locations. This is a laborious,
costly, and very resource intensive operation. The Service feel that this is not the most productive of
the winter service provision. 
This proposal would be to reduce / rationalise the number of grit bins by 25% across our communities
through the development of tighter criteria for the placing of grit bins.  These criteria will continue to
take account of the following factors: roads below a specified gradient won’t qualify for a grit bin, and
the distance from the nearest grit bin will also be taken into consideration.
- 0.065
35

Page 36

Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
CER10 Enterprise and
Sustainable
Development
Business Support 
One-off income relating to Business Support activity has been identified amounting to £2.251m.  It is
proposed that this income is used to fund revenue costs for a re-aligned Business Support Team
including four existing posts within Enterprise and Sustainable Development Service where funding
comes to an end in March 2025.  The income streams will also fund Business Growth Grants, Expert
Help Consultancy and Inward Investment for a 3-year period. 
The Business Support Team will undertake activities in a different way where Expert Help
Consultancy Support will be provided via Business Gateway which together with the cessation of
Micro Business Grants, will provide a saving of 1 x Grade 3 post (currently vacant). The criteria for
Business Growth Grants have also been strengthened to ensure the Grants achieve maximum
outcomes. The Property Advisory Service will be undertaken by the newly integrated Inward
Investment Team. 
There is also a potential income stream from Business Loans Scotland (BLS).  The Scottish
Government has advised that there will be no funding for 2024/2025 and an available option for Local
Authorities is to withdraw from BLS. For South Lanarkshire Council, this option would release at least
£0.500m. 
The Review has identified that a saving of £0.409m can be made from core funding on a temporary
basis (3 years).  The one-off income can be used to cover the cost of the revised service delivery
model. 
Reinstatement of £0.353m will be required in 2028/2029. When the one-off income comes to an end,
the Service will be required to align ongoing activities to accommodate this. This relates to inward
investment and business growth grants and identifying additional funding to support the wider
Enterprise and Sustainable Development posts. 
1.0 0.409
36

Page 37

Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
CER11 Facilities,
Waste and
Grounds
Grounds / Grass Cutting 
This proposal would see a reduction in the grass cutting specification for low and high amenity
areas. 
The Grounds Service maintains all Council owned open space - 55 public parks, including 11
District Parks.  Grounds maintenance work is seasonal and grass cutting is undertaken during the
summer months. 
The proposal is to reduce the frequency of grass cutting as per the table below: 
High Amenity Low Amenity
14 cuts (from 18) 7 cuts (from 14) 
Low amenity areas include public open space, residential grassed areas and industrial areas.  This
category has the vast majority of land at approximately 11 million m2. Grass is cut in low amenity
areas 14 times per year and collection only occurs in a small number of these areas. 
High amenity areas cover approximately 635,000 m2 and include cemeteries, high footfall areas,
public buildings, sports pitches and country park lawn areas. These areas are cut 18 times per year
and the grass is collected as part of the service. This proposal does not include cemeteries. 
This will result in a saving of £1.020m in 2025/2026. It will mean that grass will be much longer
between cuts and the general maintenance appearance will differ from current specification.  Grass
arisings will be left on the surface of those areas cut as grass collection will only remain in
cemeteries. 
This saving will mean an estimated reduction of 36 FTE (impacting up to 72 employees). 
36.0 1.020
37

Page 38

Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
CER12 Facilities,
Waste and
Grounds
School Meals 
This proposal would see Primary School and Secondary School meal charges rise by 21% and
18% respectively for the year 2025/2026. 
In 2023/2024, the Service delivered 2.9 million Primary School meals and 1.4 million Secondary
School meals. Over recent years, school meal prices have been subject to small inflationary
increases; however, South Lanarkshire Council’s charges, which are amongst the lowest in
Scotland, haven’t kept up with the level of increases experienced in food costs and other
operational costs. 
Based on 2023.2024 actual costs, the cost of production of a Primary School Meal is £3.52, and
£3.69 for Secondary Schools. South Lanarkshire Council currently charges £2.17 for Primary
School meals and £2.40 for Secondary School meals. 
In addition to this, in August 2021, Universal Free School Meals (UFSM) was introduced for P4 and
in January 2022 extended to P5 primary school pupils. Further roll out of the UFSM programme will
continue in February 2025 to pupils in P6/P7 who are in receipt of the Scottish Child Payment. It is
unclear when UFSM will be rolled out to remaining primary school pupils. 
In order to minimise the impact of necessary increased charges, the proposed price increases
would be implemented from 2025/2026 as shown overleaf: 
Current
Charge
Proposed
Charge
Primary £2.17 £2.62
Secondary £2.40 £2.83 
It is anticipated that this proposal will generate additional income of £0.400 million in 2025/2026. 
There is the option to increase charges further in future years to better reflect the cost of delivering
the service.
- 0.400
38

Page 39

Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m 
A summary of school meal pricing across Scotland is shown in the table below. 
SLC  Scottish
average 
Highest Lowest 
Primary £2.17 £2.30 £3.25 £1.08
Secondary £2.40 £2.45 £3.30 £1.08 
Full details of school meal prices for 2024 are detailed in Appendix 3A. 
CER13 Facilities,
Waste and
Grounds
Building Cleaning (Schools) 
This proposal concerns reducing the cleaning specification for schools. 
Facilities Services provides a building cleaning service to all nursery, primary and secondary
schools on behalf of Education Resources. 717 (314 FTE) employees deliver the cleaning service
across the school estate based on a cleaning specification consisting of a number of tasks and
appropriate frequencies. 
The Service is a member of APSE Building Cleaning performance network and participates in an
annual benchmarking exercise across Scotland and the broader UK. One of the key measures is
the cleaning productivity rates and in 2022/23, South Lanarkshire Council scored the third highest
rate in Primary Schools and second highest in Secondary Schools within the family group,
demonstrating that resources are being utilised efficiently. APSE data is shown in the table below
with the productivity rate measure in square metres cleaned per hour.  
South
Lanarkshire
Family Group National
Primary school 208 174 190
High school 246 205 197 
25.0 0.250 
39

Page 40

Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m 
A summary of the proposed reductions is shown in the table below. 
Task/ area Current frequency Proposed frequency
Damp dusting 4 days per week 2 days per week
High level dusting 4 weekly Monthly
Spot cleaning of walls 5 days per week Monthly
Electrostatic spraying Weekly Monthly
Staff bases, meeting rooms,
medical rooms 4 full cleans per week One full clean per week
with daily check clean 
It is anticipated these reductions in cleaning specification would generate a financial saving of
£0.500m phased over a 2-year period (£0.250m in 2025/2026 and £0.250m in 2026/2027),
reflecting the implementation from August 2025. 
This would see a reduction of 25 FTE (62 employees).  The reduction in cleaning specification will
mean a reduction of 925 cleaning hours across all schools. This will likely require
reprofiling/changing hours across the whole estate and potentially affect 717 cleaning employees. 
40

Page 41

Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
CER14 Facilities,
Waste and
Grounds
Income Generation (Bereavement) 
This proposal would see the implementation of an above inflationary price increase of 10% across
all Bereavement Service charges. 
The Grounds Bereavement Service provides a dignified and sensitive burial and cremation service,
which over recent years, has seen Service charges subject to inflationary increases. 
In order for pricing to remain competitive and appropriate, a benchmarking exercise was carried out
for the year 2024/2025, reviewing Scottish Bereavement Service charges. The table below, shows
how the current and proposed service charges compare to the average price charged by 5 of South
Lanarkshire Council’s neighbouring authorities for the year 2024/25. 
Service Line SLC Price
(2024/2025)
SLC Proposed
Price
(2025/2026)
Neighbouring
Council Average
Price
(2024/2025)
Cremation £857 £943 £953
Right of Burial £1,387 £1,526 £1,316
Coffin Internment £1,013 £1,114 £1,230 
Given the level of proposed increase, an assumed small reduction in demand has been factored
into the overall additional income. The proposed increase of 10% would generate additional income
of £0.250. 
- 0.250 
Total Community and Enterprise Resources  92.5  4.011
41

Page 42

Education Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
EDR01 Early Years/
Primary/
Secondary/
ASN 
Per Capita / Devolved School Management Spend (Re-presented) 
This saving proposes a reduction in the per capita allocation to Early Learning and Childcare (ELC)
/ primary and secondary schools (i.e. the amount we provide to establishments to spend per pupil).   
Total “per capita” spend is £3.5m.  This allowance has been subject to savings in recent years,
particularly as part of procurement efficiencies.  The consequences would be that the ability for
establishments to spend on classroom materials and resources would be reduced.   
A 14% reduction in per capita allocation of £0.480m will give a per pupil allocation of £21.81
primary, £90.90 secondary, £723.55 ASN and £74.69 ELC based on census 2023 pupil numbers. 
- 0.480
EDR02 Secondary Mentoring and Learner Journeys 
The South Lanarkshire Council Enhanced Personalised Support Programme (EPSP) operates
across all 17 mainstream Secondary schools and Kear Campus School. Its purpose is to support
vulnerable young people in S1-S4 to attain and to remain in education beyond S4 and to move into
a positive destination. 
The EPSP currently has 4 mentors (4.0FTE) each working one day per week per school to provide 
personalised support for identified young people with their learning and pathways. 
There have been recent changes to the existing MCR Pathways model, with coordinators able to
work across more than one school.  As a result of these changes, the EPSP programme can be
removed on the basis that the reduction in service is mitigated by the extension of the MCR
programme.  A saving of £0.191m is achievable in 2025/2026. 
4.0 0.191
42

Page 43

Education Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
EDR03 Support  Primary School Breakfast Clubs 
Within South Lanarkshire, primary school breakfast club provision operates from 8.15am to 8.45am
and is currently universally free of charge to all. This allows children the opportunity for a healthy
breakfast and a good start to the school day. 
It is recognised that for many parents this service also acts as childcare allowing them to get to
work. The majority of other councils who operate breakfast clubs charge a fee. 
It is proposed that in order to retain the service, rather than to reduce or remove it, that a charging
policy is implemented. 
The proposal is to charge a flat rate of £1.50 per child, with an exemption being applied where the
child is entitled to free school meals by financial assessment. This would potentially generate
income of up to £0.590m in a full year. 
However. this would require the introduction of an administrative process, administered by 1 FTE
Grade 1, costing £0.030m. 
The full year net annual saving would then equate to £0.560m, however if implemented from
August 2025, there will be a part year saving of approximately £0.350m in 2025/2026 with a further
saving of £0.210m in 2026/2027.   
(1.0) 0.350
EDR04 Secondary Instrumental Music Service (IMS) 
The Instrumental Music Service, a non-statutory service, provides music tuition for young people in
South Lanarkshire schools.  The service is funded from core Council budget and external funding
from both Creative Scotland and Scottish Government. 
It is proposed to reduce the current establishment of 29.5 FTE music instructors by 3 FTE (10%)
realising a saving of £0.184m per annum. 
3.0 0.272
43

Page 44

Education Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
In addition, a 40% reduction in materials budget is proposed yielding a saving of £0.088m per annum. 
The loss of instrumental teaching days will be achieved through a wholesale realignment of IMS
provision allocated to learning communities and a restructure of IMT timetables. Existing school music
resources will be utilised to accommodate the reduction in materials. 
EDR05 Early Years Charging for Early Years (Nursery Fees) 
This proposal considers increased Early Learning and Childcare Service (ELC) fees, out with the
statutory levels of childcare provision. 
The Council currently allows parents to purchase extra hours where there is availability within an
ELC establishment at a current cost of £3.76 / hr.  This may be in relation to wrap around hours in
nursery classes, hours in excess of the 1140 hours in standalone establishments and non-exempt
0–3-year-olds.   
ELC fees are increased annually in line with the Council charging policy which increases fees in line
with the level of inflation. This proposal is to increase fees from April 2025 to align with other local
authorities based on a benchmarking exercise (Table 1), following the increase already applied
from April 2024. 
- 0.217
44

Page 45

Education Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m 
Table 1 – West Partnership 2023/24 ELC Fees (inc. SLC) 
Local Authority £ph
2023/24
East Renfrewshire 3.40
South Lanarkshire 3.76
Renfrewshire 3.85
North Lanarkshire 4.16
Glasgow 4.50
Inverclyde 4.50
East Dunbartonshire 4.68
Average hourly rate of 6 Western
Partnership authorities 4.18 
Based on an increase aligned to the Western Partnership average rate of £4.18 per hour, the
financial implication of a change to the charging policy would result in increased income of £0.217m
in 2025/2026. 
A costing exercise, carried out to understand the unit cost per hour of ELC provided by the Council,
shows that a rate of £4.18 would still be subsidised as the current cost of Service provision has
been calculated to be £5.33 / hr. 
Total Education Resources  6.0  1.510
45

Page 46

Finance and Corporate Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
FCR01 Admin, Legal
and Licencing
Voluntary Grants, Community Grants, Gala Grants and Civic Hospitality 
Following the setting of the Council’s Budget in February 2024, a saving of £0.270 million was
agreed and the Council invested £0.270 million as transitional funding for 2024/2025, on a one-off
basis, to delay implementation of the revised saving until the 2025/2026 financial year. 
Further savings of £0.180 million have been identified, taking the total savings achievable from
2025/2026 to £0.450m. 
At present, unused grant funding is held within the Council’s Reserves with a total of £0.313 million
anticipated to be held at the end of 2024/2025.  It is proposed to utilise the reserves of £0.313
million to delay implementation of the revised savings further until the 2026/2027 financial year. 
As a result, a reduction in grants budget of £0.137 million will be implemented for
2025/2026.  Appendix 3 shows the way that the reserves can be used to minimise the impact of last
year’s savings and this year’s additional proposed saving by using reserves. Only 7 organisations
would see a reduction in funding into 2025/2026 and it is considered that withdrawal of funding from
these organisations is likely to have only a moderate negative impact on service users, and that
alternative funding sources are available. 
The full reduction in grants of £0.450 million will be realised from 2026/2027.  The proposals for that
year will reduce the level of voluntary grants, gala grants, community grants and civic hospitality.   
A full list of those grants affected in both 2025/2026 and 2026/2027 is provided in Appendix 3B. 
- 0.180 
Total Finance & Corporate Resources  -  0.180
46

Page 47

Housing & Technical Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
HTR01 Housing Sheltered Housing – Housing Support Funding to Registered Social Landlords (RSLs) 
The Council currently provides housing support funding to two RSLs, Hanover Housing Association
and Trust Housing Association.  Removal of direct funding to RSLs, in line with the national trend
over the past 15 years, would secure efficiencies of £0.692m from 2025/2026. 
This will be achievable across two financial years with £0.300m available in 2025/2026 and
£0.392m in 2026/2027. 
- 0.300 
HTR02 Housing Community Safety Partnership Contribution 
The South Lanarkshire Community Safety Partnership (CSP) is a collaboration of public services
and voluntary organisations that work together to keep people and communities safe. 
An annual contribution to the partnership is provided by the council, with funding received directed
through the partnership’s Safer South Lanarkshire Board. In 2024/25 this funding predominantly
contributed to the costs of three partnership posts:   
• Assistant Police Liaison Officer
• Victim Support Scotland Support Co-ordinator
• Partnership Analyst 
This proposal would see the Council’s contribution to the partnership reduced by £0.018m to
£0.037m in 2025/26, generating a saving of £0.018m for the council. Allocation of this contribution
will continue to be determined by the Safer South Lanarkshire Board.   
- 0.018
Total Housing & Technical Resources  -  0.318
47

Page 48

Savings for Approval FTE £m
Council Wide  - 0.375
Community & Enterprise Resources 92.50 4.011
Education Resources 6.00 1.510
Finance & Corporate Resources - 0.180
Housing & Technical Resources  - 0.318
Social Work Resources - - 
Savings for Approval (before Council Tax)  98.50  6.394  
Approved Savings  -  0.500  
Management & Operational Savings  16.85  3.769  
Total Savings (before Council Tax)  115.35  10.663
48

Page 49

Appendix 3A 
School Meal Prices 2024 
Authority Primary
£
Authority Secondary
£
North Lanarkshire 3.25  North Lanarkshire 3.30
West Dumbartonshire 3.04  West Dumbartonshire 3.04
Orkney Islands 2.70  Aberdeenshire 2.85
Aberdeenshire 2.65  Edinburgh, City of 2.80
East Renfrewshire 2.50  Orkney Islands 2.80
East Dumbartonshire 2.43  Shetland Islands 2.75
Fife 2.40  East Renfrewshire 2.70
Moray 2.40  Renfrewshire 2.70
Scottish Borders 2.40  Aberdeen City 2.65
Aberdeen City 2.35  Highland 2.55
Ediburgh, City of 2.35  East Dumbartonshire 2.54
Falkirk 2.35  Dundee City 2.50
Renfrewshire 2.35  East Lothian 2.50
South Ayrshire 2.35  Scottish Borders 2.50
Argyll & Bute 2.30  Stirling 2.50
Highland 2.30  South Ayrshire 2.45
Shetland Islands 2.30  West Lothian 2.43
Stirling 2.30  Argyll & Bute 2.40
East Lothian 2.25  Fife 2.40
Clackmannanshire 2.20  Midlothian 2.40
West Lothian 2.20  South Lanarkshire 2.40
South Lanarkshire 2.17  Perth & Kinross 2.30
Dundee City 2.15  Angus 2.20
Perth & Kinross 2.15  Falkirk 2.05
Angus 2.10  North Ayrshire 2.05
Midlothian 2.10  Dumfries & Galloway 2.00
North Ayrshire 2.05  Glasgow City 2.00
Dumfries & Galloway 1.90  Moray 1.70
Glasgow City 1.90  Inverclyde 1.50
East Ayrshire 1.08  Clackmannanshire 1.35
Inverclyde Free  East Ayrshire 1.08 
49

Page 50

Appendix 3B
Grants Information  Grant
Awarded
2024/2025
Grant
Award
2025/2026
(1) 
Proposed
Grant Award
2025/2026
(2)
Proposed
Grant
Award
2026/2027
Voluntary Organisations
Spell £28,263 £14,130  £28,263 £0
Cash for Kids £19,570 £0  £0 £0
East Kilbride Community Transport £5,552 £2,780  £5,552 £0
Lanark YMCA £5,451 £0  £0 £0
Cargill House Club  £5,047 £0  £0 £0
Coalburn Miners Welfare £2,060 £0  £0 £0
Thornton Road Community Centre £7,066 £0  £0 £0
Family Mediation  £6,561 £3,280  £6,561 £0
Particip8 Overton £3,000 £1,500  £3,000 £0
Lanarkshire Cancer Care Trust £7,571 £3,790  £7,571 £0
Lanarkshire Rape Crisis Centre £7,167 £3,580  £7,167 £0
Childcare in the Community £2,221 £1,110  £2,221 £0
Eastfield Physically Disabled Club £404 £0  £0 £0
Hamilton Churches Drop In £505 £0  £0 £0
Milan Centre Social Club  £2,019 £1,010  £2,019 £0
Parent Action Group £3,028 £1,510  £3,028 £0
Special Needs Adventure Playground (SNAP) £3,533 £1,770  £3,533 £0
Clydesdale CAB £52,118 £46,900  £52,118 £39,089
East Kilbride CAB £52,118 £46,900  £52,118 £39,089
Hamilton CAB £54,539 £49,090  £54,539 £40,904
Rutherglen CAB £52,530 £47,280  £52,530 £39,398
Hamilton Information Project for Youth £56,650 £28,330  £56,650 £0
Lightburn Elderly Association Project £55,368 £27,680  £55,368 £0
Unspent in 2024/25 £97,159 £0  £0 £0
Total Voluntary Organisations £529,500 £280,640  £392,238 £158,480
Gala Grants
Lanark Lanimer Day £4,635 £3,360  £4,635 £2,318
Rutherglen Landemar Day £4,223 £3,000  £4,223 £2,112
All other Gala Grants £15,842 £0  £15,842 £0
Total Gala Grants £24,700 £6,360  £24,700 £4,430
Community Grants
Community Groups/Playscheme Grants £103,000 £103,000  £103,000 £58,100
Total Community Grants £103,000 £103,000  £103,000 £58,100
Civic Hospitality
Civic Events £22,600 £22,600  £22,600 £11,300
Civic Gifts £5,000 £5,000  £5,000 £2,500
Total Civic Hospitality £27,600 £27,600  £27,600 £13,800
TOTAL  £684,800 £417,600  £547,538 £234,810
Movement Year on Year (24/25 to 25/26)  £267,200   
Movement Year on Year (25/26 to 26/27)     £182,790
(1) 2025/2026 Grant after 2024/2025 saving approved, (2) Use of Reserves of £0.313m in
2025/2026 
50

Page 51

Appendix 4
Page (i) 
South Lanarkshire Council 
2025/2026 Revenue Budget Summary 
2024/25
Base
Budget 
2025/26
Rollover 
2025/26
Proposed
Base
Budget 
£m  £m  £m      
Community and Enterprise Resources 130.547  0.064  130.611            
Education Resources 465.379  26.729  492.108            
Finance and Corporate Resources 41.668  (1.571)  40.097            
Housing and Technical Resources 13.926  (0.177)  13.749            
Social Work Resources 241.406  4.798  246.204            
Joint Boards 1.902  (0.273)  1.629      
Total of all Resources plus Joint Boards 894.828  29.570  924.398            
Other Budget Items:     
Loan Charges 55.898  (5.300)  50.598   
CFCR -  -  -
Corporate Items inc. Service Concession        17.153  10.810  27.963
2025/2026 One-Off Investments -  6.150  6.150
2025/2026 Savings -  (5.264)  (5.264)      
Total Base Budget 2024/2025 967.879           
Total Proposed Budget 2025/2026   35.966  1,003.845           
The 2024/2025 base budget includes adjustments approved during 2024/2025. 
51

Page 52

Appendix 4
Page (ii) 
South Lanarkshire Council 2025/2026 
Revenue Budget Summary 
2024/2025
Base
Budget  
2025/2026
Proposed
Base
Budget 
£m  £m 
Budgetary Category     
Employee Costs 627.293  640.054 
Property Costs 66.685  67.549 
Supplies and Services 62.760  62.964 
Transport and Plant Costs 44.561  49.026 
Administration Costs 16.020  15.679 
Payments to Other Bodies 69.387  71.402 
Payment to Contractors 269.594  271.658 
Transfer Payments (Housing & Council Tax Benefit) 71.865  72.132 
Financing Charges (Leasing Costs) 2.350  2.782 
Total Expenditure 1,230.515  1,253.246 
Total Income (335.687)  (328.848) 
Net Expenditure 894.828  924.398 
Other Budget Items:       
Loan Charges 55.898  50.598 
CFCR -  - 
Corporate Items inc. Service Concession Annual Benefit 17.153  27.963 
2025/2026 One-Off Investments -  6.150 
2025/2026 Savings -  (5.264) 
Total Base Budget 2024/2025 967.879   
Total Proposed Budget 2025/2026   1,003.845 
52

Page 53

Report
Agenda Item 
Report to: South Lanarkshire Council
Date of Meeting: 26 February 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: 2025/2026 Capital Programme Update
1. Purpose of Report 
1.1. The purpose of the report is to:- 
 Provide the Council with a proposed General Services Capital Programme for
financial year 2025/2026, reflecting the spend requirements identified by
Resources and the availability of funding.   
2. Recommendation(s)
2.1. The Council is asked to approve the following recommendation(s):- 
(1) That the 2025/2026 proposed Capital Programme totalling £60.216m (Section
5.16) and detailed in Appendix 4 be approved, and
(2) that the Council has considered and given due regard to the assessments
contained in the Integrated Impact Assessments relating to the proposals in this
report, and the outcomes of the associated public consultation (section 11), be
noted. 
3. Background
3.1. A proposed capital programme for 2025/2026 has been drafted for consideration by
Members.  This is based on the level of funding available in-year which is covered at
Section 4 and includes details of the Council’s grant allocations received as part of the
Local Government Finance Settlement received on 12 December 2024 and updated
on 4 February 2025. 
3.2. The proposed programme itself is presented in section 5 and takes consideration of
programmes of work and priorities as well as incorporating the programme moves and
additions from financial year 2024/2025. 
3.3. Finally, section 6 provides an update on the principles underpinning the Capital
Investment strategy in line with the main requirements of the Prudential Code. 
4. 2025/2026 Capital Programme – Funding Available 
4.1. The starting point for developing a capital programme is identification of the funding
available. For 2025/2026, the Council has been advised of an indicative level of
General Capital Grant funding of £25.062 million and Specific Capital Grants of £1.967
million.  This will be confirmed as the Local Government Finance Settlement is
approved by Parliament and forms the core funding of the programme and will be used
as the starting point for the funding package for 2025/2026.   
4.2. As part of the Local Government Settlement, an allocation of £40 million nationally has
been provided for Climate Emergency Funding.  The Council’s share of this funding is
3
53

Page 54

£2.198 million and is included in the General Capital Grant funding of £25.062 million
noted at section 4.1.  We have now been advised that the purpose of this funding is to
scale up existing projects such as renewable energy, public transport and active travel
networks. Now that the Council’s share of this funding has been confirmed,
consideration of the potential projects for this funding will be finalised and brought back
to Members for approval at the June 2025 Executive Committee. 
4.3. The Scottish Government have an allocation of £79 million nationally earmarked for
Flood Prevention.  This has not yet been distributed to Councils.  This is not included
in the General Capital Grant funding of £25.062 million quoted at section 4.1.  Any
funding received would be specifically for Flood Prevention.  Further information is
anticipated on this in April / May 2025 and will be advised to Members as information
becomes available. 
4.4. In addition to the General Capital Grant (£25.062 million) and Specific Capital Grant
(£1.967 million) funding, Capital Receipts totalling £0.700 million have been identified
as well as other funding identified for 2025/2026 for projects previously approved of
£14.508 million.  This includes existing borrowing and Levelling Up Funding. 
4.5. There are also projects that have slipped from 2024/2025 into 2025/2026 totalling
£17.979 million (refer section 5.12 and Appendix 3) that have various funding streams
attached to them.   
4.6. A detailed breakdown of the overall funding package is included in Appendix 1.  The
total funding available is £60.216 million.  This forms the funding package for the
2025/2026 Capital Programme.   
5. Proposed 2025/2026 Capital Programme
5.1. In establishing a Capital Programme for financial year 2025/2026, consideration
needs to be given to the level of spend required, against the funding available.  Each
of these areas of spend is taken in turn below. 
5.2. Core Projects: There are a number of core projects that have formed the basis of
Council Capital Programmes.  These core projects include Roads Carriageways and
Infrastructure, Planned Asset Management, Lifecycle Replacement Schools,
Prioritised Urgent Investment, Private Housing Scheme of Assistance, Schools ICT
and IT Infrastructure.  These projects are reflected in the proposed programme
which is shown in Appendix 2. 
5.3. Roads Carriageway and Associated Infrastructure: The total proposed allocation
for 2025/2026 is £11.371 million.  This is a slight increase on the £11.300 million
allocation for 2024/2025.  This includes the £0.700 million underspend on the
2024/2025 Capital Programme (Executive Committee, December 2024). 
5.4. Larkhall Leisure Centre: This proposed Capital Programme includes a 2025/2026
allocation of £5.824 million for Larkhall Leisure Centre in line with the estimated
profile of expenditure for the project which totals £23.9 million. 
5.5. Other Projects: Other projects proposed include allocations to allow the
implementation of the Ash Die Back action plan (£0.200 million), to continue
compliance with the inspection programme and subsequent remedial works for
Headstones (£0.200 million), to continue our previous support in relation to the Clyde
Gateway Regeneration Programme (£0.800 million) and a contribution towards the
Clyde Cycle Park Project (£0.200 million) – a project that is creating a high-quality
54

Page 55

combination of cycle circuits on the River Clyde in Cambuslang to promote
community, commuter and competition cycling. 
5.6. Play Parks: An allocation of £1.493 million is included in the General Capital Grant
for 2025/2026. This funding is to be used to support the renewal of play parks. 
5.7. Shawfield Remediation and Development: Levelling Up Funding totalling £14.638
million was awarded to the Shawfield Remediation and Development project, which
is being led by Clyde Gateway Urban Regeneration Company (URC).  This money
will come to the Council to be passed to Clyde Gateway.  £5.4 million was included
in the 2024/2025 budget and the remainder of £9.238 million is included in the
2025/2026 programme. 
5.8. SWIS Plus Replacement: An allocation of £0.146 million is included in the
2025/2026 programme for the completion of the project to replace the system. 
5.9. The projects outlined above in sections 5.2 to 5.8 form the base Capital Programme
for 2025/2026 totalling £38.072 million with details provided in Appendix 2. 
5.10. Specific Capital Projects (£1.967 million):  The Local Government Finance
Settlement received on 12 December 2024 allocated £1.967 million of grant funding
for specific projects. This includes specific grants for Vacant and Derelict Land
(£0.528m) and Cycling, Walking and Safer Routes (£1.439m). These projects have
also been included in the expenditure requirements for 2025/2026. 
5.11. Climate Emergency Funding Projects (£2.198 million):  As outlined in section 4.2,
as part of the Local Government Settlement, an allocation of £40 million nationally
has been allocated for Climate Emergency Funding.  The Council’s share of this
funding is £2.198 million.  The purpose of this funding is to scale up existing projects
for example renewable energy, public transport and active travel networks.  This has
been included within the Capital Programme as an overall project, however, now that
the Council’s share of this funding has been confirmed, consideration of the potential
projects will be finalised and brought back to Members for approval at the June 2025
Executive Committee. 
5.12. 2024/2025 Movements (£17.979 million): In addition to the projects identified at
sections 5.2 to 5.11 above, there were project movements from 2024/2025 into
2025/2026 which were approved by Executive Committee throughout the year, up to
and including the meeting on 11 December 2024. These movements total £17.979
million and reflect the 2024/2025 budget not required in that year.  A breakdown of
these projects is included in Appendix 3 and will be included in the programme for
2025/2026.   
5.13. Glasgow City Region City Deal: There are a number of projects which are being
progressed as part of the Glasgow City Region City Deal Programme.  The proposed
programme includes elements of project movements from 2024/2025 relative to the
City Deal programme of works (refer section 5.12).   
5.14. Further work will take place with Resources over the coming months to identify further
expected expenditure anticipated to be incurred on Glasgow City Region City Deal
projects in 2025/2026.  This will be included in the consolidated programme to be
provided to the June 2025 Executive Committee. 
5.15. Part of this additional City Deal expenditure will be the Council’s element of a new
regional Enabling Commercial Property project which will be funded by the Council’s
55

Page 56

share of City Deal grant monies.  The Council’s allocation and its projects will be
confirmed by Glasgow City Region Cabinet in February and thereafter, information
will be brought back to Members through Capital monitoring reports. 
5.16. 2025/2026 Capital Programme Summary: Taking into account the proposals
covered in sections 5.2 to 5.15 a budget of £60.216 million is required in 2025/2026.
A full list of the projects which make up this £60.216 million is detailed in Appendix 4. 
6. Key Highlights from the Capital Investment Strategy
6.1. The revised Prudential Code for Capital Finance in Local Authorities 2017 requires
councils to produce a Capital Strategy. 
6.2. The key issues and risks that will impact on the delivery of the Capital Strategy, how
the Capital Strategy and Treasury Management Strategy are aligned, and the
governance framework required to ensure the Capital Strategy can be delivered
have been updated for financial year 2025/2026 and are detailed in Appendix 5. 
6.3. The Long-Term Capital Investment Strategy will be reviewed during 2025/2026. 
7. Employee Implications
7.1. There are no employee implications as a result of this report. 
8. Financial Implications
8.1. Section 4 details the funding available in-year of £60.216 million with a breakdown
included in Appendix 1.   
8.2. A Capital Programme for financial year 2025/2026 totalling £60.216 million has been
proposed in this report.  Details as to how this Programme has been arrived at are
shown in Section 5. 
9. Climate Change, Sustainability and Environmental Implications
9.1. Any implications for climate change, sustainability or the environment in terms of the
information contained in this report are noted as part of the Integrated Impact
Assessment outlined at section 11. 
10. Other Implications
10.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
11. Integrated Impact Assessment and Consultation Arrangements
11.1. An Integrated Impact Assessment has been undertaken for the overall Council Capital
Programme for 2025/2026.  The Council has therefore considered and given due
regard to the assessments contained in the Integrated Impact Assessment relating to
the proposals in this report, and the outcomes of the associated public consultation. 
The Integrated Impact Assessment is available online. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 February 2025 
56

Page 57

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 11 December 2024 - Capital Budget 2024/2025 and Monitoring
for Period 8 - 1 April 2024 to 1 November 2024. 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
57

Page 58

Appendix 1 
2025/2026 Capital Programme – Funding Available (section 4) 
Funding Source
Total
Funding
Available
(£m)
General Capital Grant 
(including Play Parks and Climate Emergency Funding)
25.062
Specific Capital Grant – Vacant and Derelict Land 0.978
Specific Capital Grant – Cycling, Walking and Safer Routes 1.439
Capital Receipts 0.700
Existing Borrowing – Previous Years (Approved) 20.346
Developer Contributions 1.965
Partners Funding 0.450
Levelling Up Funding  9.238
CFCR / Reserves 0.038
Total Funding Available 60.216 
58

Page 59

Appendix 2 
2025/2026 Capital Programme – New (section 5.9) 
Project Name and Description 2025/2026
Base
Programme
(£m)
Schools ICT Development 1.300
IT Infrastructure 0.300
Private Housing Scheme of Assistance 1.000
Planned Asset Management 4.300
Prioritised Urgent Investment in Property Assets 1.200
Lifecycle Replacement - Schools  0.500
Road Carriageways and Infrastructure (core and 24/25 underspend) 9.571
Road Carriageways and Infrastructure (24/25 budget) 1.800
Larkhall Leisure Centre  5.824
Ash Die Back  0.200
Headstone Remedial Works  0.200
Clyde Gateway  0.800
Clyde Cycle Park Project 0.200
Play Parks 1.493
Shawfield Remediation and Development 9.238
SWIS Plus Replacement 0.146
Total 2025/2026 Capital Programme (New) 38.072  
Scottish Government – Other Grant Funded Projects 
Vacant and Derelict Land (section 5.10) 0.528
Cycling, Walking and Safer Routes (section 5.10) 1.439
Climate Emergency Funding (section 5.11) 2.198
Total Scottish Government – Other Grant Funded Projects 4.165 
59

Page 60

Appendix 3 
2024/2025 Project Movements into 2025/2026 (section 5.12) 
Project Name and Description 2024/2025
Budget
Slippage
(£m)
Community and Enterprise Resources 
Larkhall Leisure Centre 1.027
Leisure and Culture Transformation Fund 4.900
Priory Changing Pavilion, Blantyre 0.236
Lanark Library 0.442
Vacant and Derelict Land Fund - Langlands West 0.450
Clyde Bridge 0.192
Hairmyres Station Park and Ride (incl Active Travel Infrastructure) 1.450
Roads - GSO Redwood Drive  0.048
Roads - Pedestrian Crossings - Eaglesham Road 0.089
Glasgow City Region City Deal: 
- Secondary School Estate – Holy Cross High School 3.458
- Hamilton Junctions Upgrade 3.333
- Lanark Road Signalisation 0.040
- Cathkin Bypass  0.066
Total Community and Enterprise Resources 15.731  
Education Resources 
Secondary School Estate – St Andrew’s and St Bride’s 1.603
Total Education Resources 1.603  
Housing & Technical Resources 
Alarms (Analogue to Digital) Fire Alarm System Upgrade 0.607
2024/2025 Central Energy Efficiency Fund (CEEF) 0.038
Total Housing & Technical Resources 0.645  
2024/2025 Budget Setting Movements into 2025/2026 17.979 
60

Page 61

Appendix 4
2025/2026 Summary of Capital Programme Expenditure (section 5.16) 
Project Name and Description 2025/2026 Budget 
Community and Enterprise Resources (£m)
Roads Carriageway and Infrastructure 11.371
Larkhall Leisure Centre 6.851
Ash Die Back 0.200
Headstone Remedial Works 0.200
Clyde Gateway 0.800
Clyde Cycle Park Project 0.200
Play Parks 1.493
Shawfield Remediation and Development 9.238
Vacant and Derelict Land Fund 2025/2026 0.528
Cycling, Walking and Safer Routes 2025/2026 1.439
Climate Emergency Funding Projects 2025/2026 2.198
Leisure and Culture Transformation Fund 4.900
Priory Changing Pavilion, Blantyre 0.236
Lanark Library 0.442
Vacant and Derelict Land Fund - Langlands West 0.450
Clyde Bridge (Retention) 0.192
Hairmyres Station Park and Ride (incl Active Travel Infrastructure) 1.450
Roads - GSO Redwood Drive  0.048
Roads - Pedestrian Crossings - Eaglesham Road 0.089
Glasgow City Region City Deal: 
- Secondary School Estate 3.458
- Hamilton Junctions Upgrade 3.333
- Lanark Road Signalisation 0.040
- Cathkin Bypass  0.066
Total Community and Enterprise Resources 49.222  
Education Resources 
Schools ICT Development 1.300
Secondary School Estate  1.603
Total Education Resources 2.903  
Finance and Corporate Resources 
IT Infrastructure 0.300
Total Finance and Corporate Resources 0.300  
Housing & Technical Resources 
Private Housing Scheme of Assistance 1.000
Planned Asset Management 4.300
Prioritised Urgent Investment in Property Assets 1.200
Lifecycle Replacement - Schools 0.500
Alarms (Analogue to Digital) Fire Alarm System Upgrade 0.607
2024/2025 Central Energy Efficiency Fund (CEEF) 0.038
Total Housing & Technical Resources 7.645  
Social Work Resources 
SWIS Plus Replacement 0.146
Total Social Work Resources 0.146
Total Proposed 2025/2026 Capital Programme 60.216
61

Page 62

Appendix 5 
Principles underpinning the Capital Investment Strategy 
1. Key issues and risks that will impact on the delivery of the Capital Investment
Strategy and other long-term liabilities 
The Prudential Code requires the Council to identify the long-term implications, both
financial and operational, and the potential risks to service delivery through non-
investment in our assets.  The Council’s appetite for risk is taken into account in
establishing the Capital Strategy. 
There are no proposals in this report which would impact on the Council’s long-term
liabilities that have not been considered, such as long-term borrowing, or provisions. 
2. The Alignment of the Capital Strategy and Treasury Management Strategy  
The Prudential Code requires that the Council’s Capital Strategy be aligned with the
Treasury Management Strategy which is approved by the Executive Committee
annually as part of the budget setting process. This Treasury Management report is
also being presented to this Meeting for approval. 
The capital programme determines the borrowing need of the Council, the Treasury
Management process essentially monitors the longer-term cash flow planning, to
ensure the Council can manage its capital spending obligations. 
The Capital Strategy details the Council’s debt position, including the anticipated level
of debt and the authorised borrowing limit.   
3. Governance Framework  
It is important that the appropriate Governance framework be in place when
considering capital investment.  In order to mitigate some of the risks associated with
poor governance, there is appropriate governance arrangements in place in terms of
the Capital Programme and Treasury Management processes.  These are detailed
below.   
i) Capital Programme Governance:  The Capital Programme is prepared
following an exercise to prioritise projects in line with the Council priorities and
links to Asset Management Plans and is subject to approval by the Executive
Committee or Council. Any changes to the programme will be agreed by the
Executive Committee.  The Head of Finance (Strategy) and Head of Property
Services monitors the delivery of the capital programme on a monthly basis. 
This is reported to elected members via the Executive and Resource
Committees, along with the Financial Resources Scrutiny Forum. The Capital
Programme is subject to Internal and External Audit Review. 
ii) Treasury Management Governance: The Council’s treasury activities are
regulated by the Local Government (Scotland) Acts 1975 and 2003, and a
professional code of practice (the CIPFA Treasury Management in Public
Services Code of Practice – revised December 2017). It is a requirement of this
Code, and the financial regulations of South Lanarkshire Council, that a
Treasury Management Strategy is approved by Committee every year. A key
requirement of this strategy it to explain both the risks and the management of
these risks associated with the treasury function. The Council employs Link
Asset Services as its Treasury Management Advisors. Treasury Management
62

Page 63

is also subject to Internal and External Audit review. 
4. Knowledge and Skills  
The employees responsible for monitoring the Council’s capital programmes, asset
management, and treasury management have the appropriate skills and knowledge
to ensure the successful delivery of capital investment.   
5. Capital Programme Summary  
The Future Capital Investment Strategy (November 2018) provided an estimate of
potential capital investment and funding package.  This was based on the information
available at that time and will be subject to further refinement when the ongoing works
to develop each of the projects / programmes is complete.   As an update to the Capital
Strategy, this report provides a proposed programme for 2025/2026.   
63

Page 64

64

Page 65

Report
Agenda Item 
Report to: South Lanarkshire Council
Date of Meeting: 26 February 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Prudential Indicators, Treasury Management Strategy
and Annual Investment Strategy 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide members with the Prudential Code indicators for 2025/2026 to 2027/2028,
 provide members with the Treasury Management Strategy for 2025/2026, and
 provide members with the Annual Investment Strategy for 2025/2026.
[1purpose]
2. Recommendation(s)
2.1. The Council is asked to approve the following recommendation(s):- 
(1) that the Prudential Code indicators for 2025/2026 to 2027/2028 are approved
(section 4)
(2) that the 2025/2026 Treasury Management Strategy is approved (section 5); and
(3) that the Annual Investment Strategy is approved (section 6) 
3. Background 
3.1. Through guidance and regulation, the Council is required to produce Prudential
Indicators, a Treasury Management Strategy and an Annual Investment Strategy.  It
has been cited as best practice to combine the information in one document.  This
paper will therefore cover: 
 Prudential Indicators (Section 4)
 Treasury Management Strategy (Section 5)
 Annual Investment Strategy (Section 6) 
4. Prudential Code Indicators
4.1. The Prudential Code for Capital Finance in Local Authorities was introduced through
the Local Government (Scotland) Act 2003 with the aim of supporting strategic
planning for capital investment at a local level. 
4.2. The key objectives of the Code are to ensure, within a clear framework, that the capital
expenditure plans of local authorities are affordable, prudent and sustainable; and that
treasury management decisions are taken in accordance with good professional
practice and in full understanding of the risks involved and how these risks will be
managed to levels that are acceptable to the organisation. 
4
65

Page 66

4.3. The Prudential Indicators for 2025/2026 to 2027/2028 are shown in Appendix 1 along
with explanations for each indicator. An updated position for 2024/2025 is also
included. 
4.4. Through these Prudential Indicators we are laying out what our expectations are for 
the coming year, and setting limits based on these expectations.  A report will be 
presented to Committee later this year showing actual achievement against the 
2024/2025 indicators. 
4.5. The first three indicators show details of capital expenditure, how this will be funded
and set limits for external borrowing. The fourth indicator demonstrates the financial
impact of the expected borrowing and that this is affordable. 
4.6. Capital Expenditure and Asset Management: The Prudential Indicators includes
estimates of capital expenditure. It was through the introduction of the Code that
councils are now able to take responsibility for deciding an affordable level of
borrowing to fund capital expenditure.  This moves away from the previous regime
through which central government gave councils consent to borrow defined amounts
for capital expenditure. The Prudential Indicators show the level of borrowing required. 
4.7. An update to the General Fund capital programme for 2025/2026 was presented to
this meeting earlier in the agenda.  This allows for investment across priorities
consistent with the objectives of the Council Plan. 
4.8. The capital expenditure for 2025/2026 included in our indicators is based on the
aforementioned report, while for 2026/2027 and 2027/2028 estimates have been
made. It includes the General Capital Grant funding allocated by the Scottish
Government and projects which will be funded by Specific Capital Grants from the
Scottish Government. 
4.9. The HRA capital programme for 2025/2026 is also presented to this meeting, following
its endorsement by the Executive Committee on 12 February 2025. For financial years
2026/2027 and 2027/2028, estimated capital programmes based on the HRA business
plan have been included. 
4.10. Housing capital expenditure reflects investment priorities of maintaining and improving
the housing stock to meet national housing quality and energy efficiency standards.
The programme also includes projects to increase the supply of council housing as
well as environmental works and legislative compliance programmes to ensure that all
safety requirement standards are met.  
4.11. The Prudential Code also recognises that in making capital investment decisions the
authority should be informed by sound asset management planning and options
appraisal. 
4.12. When considering potential capital investment, the Council ensures that the objectives
of capital investment fit within the Council strategic plans and that the investment is
informed through the asset management planning process. The following asset
management plans were updated for 2024 and approved by the relevant Resource
Committees. 
 2024/2025 Information and Communication Technology (ICT) Asset
Management Plan presented to Finance and Corporate Resources Committee
on 22 May 2024
66

Page 67

 Roads Asset Management Plan – 2024 Update presented to Community and
Enterprise Resources Committee on 17 September 2024 
4.13. An update to the Property Asset Management Plan is due to go the next meeting of
the Housing and Technical Resources Committee on 7 May 2025. 
4.14. Work to fully develop the Fleet Asset Management Plan is ongoing with a full review
planned for 2025/2026, however transformational activity and work to review the fleet
has taken place during 2024/2025 and reported to CMT.   
5. Treasury Management Strategy
5.1. The Council’s treasury activities are regulated by statute, and a professional code of
practice (the CIPFA Treasury Management in the Public Services Code of Practice). 
It is a requirement of this Code, and the financial regulations of South Lanarkshire
Council that a Treasury Management Strategy is approved by Committee every year. 
5.2. The Treasury Management Strategy for 2025/2026 is detailed at Appendix 2. The main
areas covered by the Strategy are: 
 Debt and Investment Projections
 Expected Movement in Interest Rates
 Borrowing Strategies
 Statutory Repayment of Loans Fund Advances 
5.3. The level of borrowing required to fund the Council’s Capital programme, together with
the variable nature of interest rates increases the risks associated with the treasury
management function. As a result, the Council will take a cautious approach to its
Treasury Strategy by setting treasury management indicators to contain the activity of
the treasury function within certain limits, thereby managing risk and reducing the
impact of adverse movements in interest rates. 
5.4. Key details included in the Indicators include total net external debt which is expected
to reach £1,277.096m by the end of 2024/2025. 
5.5. External debt includes the liability of £164.646m that is included on the Council’s
balance sheet for the Secondary Schools and finance leases under International
Financial Reporting Standards. It should be noted that while these liabilities are to be
classed as external debt, there is no requirement to borrow these amounts and there
is therefore no impact on borrowing costs. 
6. Annual Investment Strategy 2025/2026
6.1. The Local Government Investments (Scotland) Regulations 2010 provides a formal
investment framework for councils. It provides greater autonomy for local authorities
in their investment activities but with this greater freedom comes greater responsibility
and the onus is on local authorities to act prudently with regard to their investment and
treasury management activities. 
6.2. The Council can decide what investment tools it will class as permitted investments in
the coming year. The Regulations require an Annual Investment Strategy detailing the
permitted investments to be approved by the Council. 
6.3. The Annual Investment Strategy for 2025/2026 has been included at Appendix 3. 
67

Page 68

6.4. The two fundamental principles of the Investment Regulations are that: 
 Councils are required to manage their investments and deposits in a way that
minimises the risk to the capital sum and optimises the return on the funds
consistent with those risks.  Security should be considered first, then liquidity,
and lastly the yield or return. 
 Councils are able to determine what investments they may make, including both
the type and duration of the investment. 
6.5. The Annual Investment Strategy is considered to be central to the Regulation. The
Council is required to prepare an Annual Investment Strategy prior to the start of the
financial year. 
6.6. The Regulations require the Council to consider its investment activity as a whole. This
includes a range of investments, which covers the depositing of temporary surplus
funds with banks and similar institutions, shareholdings in companies or joint ventures,
loans to group undertakings and third parties. It also covers investment properties. 
6.7. The Council is required to set out in the strategy the types of investment that it will
permit in the financial year. These will be known as “permitted investments”.  The
strategy also limits the amounts that may be held in such investments at any time in
the year. 
6.8. After consideration of the Council’s requirements to manage funds and our approach
to risk, no changes have been made to the permitted investments previously agreed
for 2024/2025. 
6.9. The Executive Director of Finance and Corporate Resources will ensure that the
strategy is adhered to at all times.  The Council can only make an investment if that
type of investment is detailed in this Strategy. 
6.10. Responsible Investing. The Annual Investment Strategy includes a section on
Responsible Investing. 
6.11. While there have been some developments in the assessment of ESG credentials it
is still an evolving picture. Unlike credit ratings which are a well-established method of
assessing the creditworthiness of an organisation, there is still no widely accepted
measure of assessing an organisation’s approach to climate change and
sustainability. 
6.12. The Council has no need to hold any deposits in banks, however it does need to
manage liquidity risk and that it has access to funds to meet any unexpected
expenditure. The Council will therefore continue to minimise its deposits with banks
while managing Treasury Management risks. 
6.13. Deposits with banks will be limited to instant access call accounts which meet the
Council’s liquidity requirements. As banks are required to hold capital in reserves to
cover these deposits, they cannot use the council’s money to invest in any projects. 
6.14. Borrowing in Advance:- Borrowing in advance of need increases the level of funds
which require to be invested or deposited. Scottish Ministers therefore require local
authorities to set out within their Annual Investment Strategy, their approach to
borrowing in advance. 
68

Page 69

6.15. The CIPFA Prudential Code is clear that the Council must not borrow more than, or in
advance of needs purely in order to profit from the investment of the extra sums
borrowed. 
6.16. The Council needs to be able to demonstrate that borrowing is for a legitimate purpose
such as the exercise of day to day cash management or the management of borrowing
for capital purposes. 
6.17. The regulations do not prevent borrowing in advance of need but for it to be allowed
the Council must detail its policy for borrowing in advance in the strategy. 
6.18. The Executive Director of Finance and Corporate Resources will ensure that
borrowing is taken at the most appropriate time to ensure best value and that the
requirements of the Prudential Code are met. 
7. Employee Implications
7.1. None 
8. Financial Implications
8.1. There are no direct funding implications arising from the production of the Prudential
Indicators, Treasury Management Strategy or Annual Investment Strategy. 
8.2. The financial impact from treasury activity and borrowing for capital expenditure has
been built into the long-term revenue budget strategy. 
9. Climate Change, Sustainability and Environmental Implications
9.1. Section 6.10 of this report and Section 10 of the Annual Investment Strategy provides
information on our approach to responsible investing and how we will ensure that our
deposits with banks are not used to fuel the climate and ecological crises. 
10. Other Implications
10.1. South Lanarkshire Council recognises that any treasury management activity will carry
an element of risk.  It is important that risk is identified, and controls put in place to
limit those risks. 
10.2. The preparation and approval of Prudential Indicators and the Treasury Management
Strategy set a framework for treasury management activities and limits on debt to
mitigate risks. 
10.3. The CIPFA Treasury Management Code of Practice adopted by the Council, places
Credit and Counterparty risk at the forefront of treasury risks. 
10.4. South Lanarkshire Council recognises that any investment activity will carry an
element of risk. It is important that risk is identified, and controls put in place to limit
and manage those risks. 
10.5. Section 5 of the Annual Investment Strategy details how South Lanarkshire Council
will manage these risks. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
69

Page 70

11.2. There is no requirement to undertake any consultation in relation to the content of the
report. 
Jackie Taylor
Executive Director of Finance and Corporate Resources 
7 February 2025 
Link(s) to Council Values/Priorities/Outcomes
 Value:  Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O’Hagan, Head of Finance
Ext:  5367 (Tel: 01698 455367)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
70

Page 71

Appendix 1 
Prudential Indicators 2024/25 – 2027/2028
The Prudential Indicators are shown below and are split into 2 categories: 
• Capital Expenditure and External Debt
• Affordability 
Indicators 1 to 3 show statements of the expected borrowing requirement for the years
2024/2025 to 2027/2028 and attributes limits for external borrowing. 
Indicator 4 demonstrates the financial impact of the expected borrowing for the years
2024/2025 to 2027/2028 and that this borrowing is affordable. 
After year end, the actual position for the Indicators will be reported to the Executive
Committee. 
Capital Expenditure and External Debt Indicators 
1. Prudential Indicator 1 – Capital Expenditure
1.1. This indicator states the capital expenditure plans for the years 2024/2025 through to
2027/2028.  The indicator takes account of the anticipated spend for 2024/2025 and
2025/2026. For 2026/2027 and 2027/2028, the Capital Strategy has been used as the
basis, adjusted to reflect anticipated spend and funding.   
2024/25
Estimate
£ m
2025/26
Estimate
£ m
2026/27
Estimate
£ m
2027/28
Estimate
£ m 
General Fund Capital Expenditure  69.832  60.216  62.208  56.628
Funded by:    
Borrowing 17.560 20.346 24.338 18.758
Capital Receipts and Grants 51.353 39.832 37.870 37.870
Contributions from Reserves 0.919 0.038 0.000 0.000
Revenue Contributions 0.000 0.000 0.000 0.000
Total Funding 69.832 60.216 62.208 56.628 
HRA Capital Expenditure  72.106  85.948  80.213  35.633
Funded by:    
Borrowing 18.221 25.380 22.550 0.000
Capital Receipts and Grants 20.379 24.935 22.030 0.000
Revenue Contributions 33.506 35.633 35.633 35.633
Total Funding 72.106 85.948 80.213 35.633 
1.2. The table overleaf shows how the borrowing required for the capital programmes and
to use the benefit from the service concession flexibility are adjusted for loans fund
principal repayments, maturing debt, use of cash balances and reserves and
borrowing carried over between financial years to derive the borrowing requirement
for the Council in each financial year.
71

Page 72

2024/25
Estimate
£ m
2025/26
Estimate
£ m
2026/27
Estimate
£ m
2027/28
Estimate
£ m 
Borrowing for GF Capital Expenditure  17.560  20.346  24.338  18.758
Borrowing for HRA Capital Expenditure 18.321 25.380 22.030 0.000
Total Borrowing for Capital Expenditure 35.881 45.726 46.368 18.758
Less Loans Fund Principal Repayments (3.735) (8.618) (18.476) (19.459)
Funding for Capital Programmes 32.146 37.108 27.892 (0.701)
Funding for Service Concession Flexibility 4.587 4.645 4.480 3.768
Movement in CFR 36.733 41.753 32.372 3.067
Maturing Debt 53.770 261.842 401.164 513.167
Use of Cash Balances and Reserves (132.000) 10.000 10.000 10.000
External Borrowing Requirement (41.497) 313.595 443.536 526.234
Reprofiling of Service Concession Flexibility (19.490) 17.455 (0.480) 0.232
Borrowing carried over from previous years. 202.676 0.000 0.000 0.000
Adjusted External Borrowing
Requirement 141.689 331.050 443.056 526.466
Actual/Planned Borrowing 141.689 331.050 443.056 526.466
Borrowing carried over to future years. 0.000 0.000 0.000 0.000 
1.3. No long term borrowing has been taken so far in the current financial year as interest
rate forecasts show an expectation that rates will decrease over the next two to three
years.  Instead, short term borrowing has been taken to ensure that the Council has
sufficient cash available to meet its Revenue and Capital expenditure requirements. 
1.4. The interest rate forecast provided by the Council’s treasury adviser, MUFG Corporate
Markets Treasury Ltd, shows a reduction in PWLB rates from an average of 5.100%
in June 2025 to 4.200% in December 2027. It would therefore be more expensive to
take long term borrowing in 2024/2025, 2025/2026 and 2026/2027 than wait until
2027/2028. 
1.5. The borrowing strategy assumes that borrowing taken in 2024/2025, 2025/2026 and
2026/2027 is short term borrowing at rates equivalent to base rate. This means that
the borrowing requirement for these years rolls over and increases the borrowing
requirement in the following years. 
1.5. The borrowing identified above, and associated costs have been included in the
Council’s Financial Strategy. 
1.6. Finance Services will continue to regularly review our forecast for loan charges, taking
into account the most up to date interest rate forecasts. This will allow us to consider
options for borrowing including the timing, source and period over which we borrow to
minimise our borrowing costs and ensure our capital expenditure plans remain
affordable. 
2. Prudential Indicator 2 – Council’s Borrowing Need (the Capital Financing
Requirement) and Gross Debt
72

Page 73

2.1. The Council’s Capital Financial Requirement (CFR) is the total outstanding capital
expenditure which has not yet been paid for from either revenue or capital resources. 
It is essentially a measure of the Council’s underlying need to borrow for past and
present capital expenditure. 
2.2. The Council is required to pay off an element of the accumulated balance of borrowing
every year through a charge to the revenue account. 
2.3. In order that over the medium-term debt will only be for a capital purpose, the Council
needs to ensure that debt does not, except in the short term, exceed the total of the
Capital Financing requirement (CFR) in 2024/2025 plus the estimates of any additional
CFR for 2025/2026 and the following two financial years.  This allows some flexibility
for limited early borrowing for future years but ensures that borrowing is not
undertaken for revenue purposes. 
2.4. The projected Capital Financing Requirement and Gross Debt is shown in the table
below. 
2024/25
Estimate
£ m
2025/26
Estimate
£ m
2026/27
Estimate
£ m
2027/28
Estimate
£ m
General Fund Capital Financing
Requirement  1,113.053  1,126.246  1,138.761  1,145.172 
HRA Capital Financing Requirement  325.533  346.493  358.756  348.364
Total Capital Financing
Requirement  1,438.586  1,472.739  1,497.517  1,493.536 
Gross Debt  1,287.906  1,348.704  1,383.002  1,389.254 
Difference  150.680  124.035  114.515  104.282 
2.5. It can be seen that the estimated gross debt levels for the period 2024/2025 to
2027/2028 do not exceed the forecast CFR at the end of 2027/2028, demonstrating
that borrowing will only be undertaken for capital purposes. 
2.6. This indicator sets out the expected CFR based on the capital plans shown at Indicator
1. Actual CFR for 2024/2025 will be presented to committee following year end. 
3. Prudential Indicator 3 – Limits to Borrowing 
3.1. The Operational Boundary for external debt is based on the expected maximum
external debt that could be faced in the course of the year.  It is set to accommodate
the borrowing requirements as detailed at Prudential Indicator 1, and also includes
sufficient scope to allow for changes to the capital programme throughout the year
and to borrow for the following year should this be considered appropriate. This limit
is permitted to be breached during the year. This would be reported in the Prudential
Indicators report presented to Committee after year end. 
3.2. The Authorised Limit for External Debt represents a limit beyond which external
debt is prohibited.  It represents the level of external debt which could be afforded in
the very short term, but is not sustainable in the longer term without consideration to
revenue budgets.  This limit needs to be set or revised by the full Council who should
also be advised if the limit is exceeded or is expected to be exceeded. Again the limits
include scope to borrow for the following year should this be considered appropriate. 
73

Page 74

2024/25
Estimate
£ m
2025/26
Estimate
£ m
2026/27
Estimate
£ m
2027/28
Estimate
£ m
Operational Limit for debt 1,460.000 1,570.000 1,650.000 1,720.000
Operational Limit for other liabilities 180.000 170.000 160.000 160.000
Operational Limit 1,640.000 1,740.000 1,810.000 1,880.000
Authorised Limit for debt 1,480.000 1,590.000 1,670.000 1,740.000
Authorised Limit for other liabilities 180.000 170.000 160.000 160.000
Authorised Limit 1,660.000 1,760,000 1,830,000 1,900.000 
Affordability Indicators 
4. Prudential Indicator 4 – Ratio of Financing Costs to Net Revenue Stream
4.1. This indicator focuses on the extent to which the Council’s net revenue budget is used
for servicing debt.  This is shown for both General Fund and HRA. The figures for
General Fund include the reduction in the PPP/Finance Lease Liability as a financing
cost. 
2024/25
Estimate
£ m
2025/26
Estimate
£ m
2026/27
Estimate
£ m
2027/28
Estimate
£ m
General Fund Ratio of Financing
Costs to Net Revenue Stream
(expressed as %)
3.91% 4.31% 4.88% 5.18% 
HRA General Fund Ratio of
Financing Costs to Net Revenue
Stream (expressed as %)
8.58%  14.64%  17.71%  17.57% 
4.2. While the Council has prepared a Financial Strategy for 2025/2026 to 2027/2028, at
the time of writing this report, we have not been advised of our General Revenue Grant
funding beyond 2025/2026. The indicators have been calculated using the
assumptions regarding reductions in grant levels built into the Financial Strategy for
2026/2027 and beyond. 
4.3. For the HRA, estimates of rental income in each financial year have been used in the
calculation. 
Prudential Indicator 5 – Ratio of Net Income from Commercial and Service
Investments to Net Revenue Stream
4.4. The Prudential Code for Capital Finance in Local Authorities 2021 introduced a new
indicator – The Ratio of Net Income from Commercial and Service Investments to Net
Revenue Stream. 
4.5. The Code defines Commercial Investments as investments taken or held primarily for
financial return and not linked to treasury management activity and Service
Investments as those directly involved in the delivery of a service, for example, loans
to leisure providers, loans to trusts providing services, a shareholding in a shared
service vehicle, and investments in local companies for regeneration. 
4.6. As the Council has no investments that fall into these categories, there is no
requirement to report this indicator.
74

Page 75

Appendix 2
Treasury Management Strategy 2025/2026 
1. Foreword
1.1. The treasury management function is an important part of the overall financial
management of the Council’s affairs.  The treasury management function considers
the effective funding of capital investment plans and works toward ensuring that best
practice is followed when making decisions on managing Council deposited funds. 
The Council’s treasury activities are regulated by the Local Government (Scotland)
Acts 1975 and 2003, and a professional code of practice (the CIPFA Code of Practice
on Treasury Management – revised December 2021).  It is a requirement of this Code,
and the financial regulations of South Lanarkshire Council, that a Treasury
Management Strategy is approved by Committee every year. 
A key requirement of this strategy is to explain both the risks and the management of
these risks associated with the treasury function.  A further report will be produced
after the year end to report on actual activity during the year. It is a requirement of the
Treasury Management Code of Practice that a mid year monitoring report is produced.
This will cover the period 1 April 2024 to 30 September 2024 and will be submitted to
Committee after that date. 
This strategy covers: 
• The Council’s debt and investment projections (Section 2)
• The Council’s estimates and limits on future debt levels (Section 3)
• The expected movement in interest rates (Section 4)
• The Council’s borrowing strategy (Section 5)
• Treasury Management Limits on Activity (Section 6)
• Statutory Repayment of Loans Fund Advances (Section 7) 
2. Debt and Investment Projections 2025/2026 – 2027/2028
2.1 The expected levels of external borrowing and investment for 2024/2025 to 2025/2026
are shown in the table below.  An updated position for 2023/2024 is also shown.   
2024/25
Estimate
£ m
2025/26
Estimate
£ m
2026/27
Estimate
£ m
2027/28
Estimate
£ m
External Debt
Borrowing   £1,122.450 £1,191.657 £1,233.548 £1,246.848
Other long term
liabilities  £164.646  £157.047  £149.454  £142.406
Debt at 31 March
(including
PPP/Finance Lease
Liability)  £1,287.096  £1,348.704  £1,383.002  £1,389.254
Investments
Total Investments at 
31 March  £10.000  £10.000  £10.000  £10.000 
75

Page 76

3. Estimates and Limits on Future Debt Levels
3.1 There are a number of key indicators to ensure the Council operates its activities within
well defined limits.  These are detailed in the Prudential Indicators Appendix 1,
paragraphs 2.1 to 3.2. 
4. Expected Movement in Interest Rates 
4.1. The interest rate forecast provided by the Council’s treasury adviser, MUFG Corporate
Markets Treasury Ltd, is reproduced below. Economic and interest rate forecasting
remains difficult with so many external influences weighing on the UK. The forecasts
below will be liable to further amendment depending on how economic data and
developments in financial markets transpire over the next year. 
Medium Term Interest rates - Annual Averages 
4.2. Since the start of 2022, movement in gilt yields and hence PWLB rates have been
volatile while steadily increasing. As shown in the table above, our advisers are
forecasting a steady, but slow, fall in both Bank Rate and PWLB. It is expected that
there will be periods of volatility around this decrease in rates. 
4.3. The differential between investment earnings and debt costs remains high and is
expected to continue in 2025/2026. This “cost of carrying” needs to be considered if
borrowing is taken before our cash flow requires funds as returns on deposits will be
lower than the rate paid on borrowing. 
5. Borrowing Strategy 
5.1. The Council is currently maintaining an under-borrowed position in comparison to its
Capital Financing Requirement, using its cash balances rather than borrowing to fund
capital expenditure. This strategy is prudent as investment returns remain low in
comparison to the rates at which we can borrow, medium and longer dated borrowing
rates are expected to fall from their current levels and counterparty risk is still an issue
that needs to be considered. 
5.2. The Council’s borrowing strategy will be to minimise borrowing costs over the medium
to long term by considering the borrowing requirement arising from the capital
programmes along with expected interest rates and the level of existing cash balances
and reserves. 
5.3. In conjunction with advice from its treasury adviser, the Council will keep under review
the options it has in borrowing from the PWLB, the market and other sources up to the
available capacity within its CFR and Authorised Limit. 
5.4. One of the options to finance capital borrowing is the issuance of Bonds.  In the right
circumstances, Bonds could be appropriate for the Council but are dependent on the
level of borrowing, the repayment period and the mix of other funding sources to fund
a large-scale capital programme. To date, their use has not been considered
appropriate or necessary given the amount the Council requires to borrow and the 
Base
Interest
Rate
5 year
PWLB 
10 year
PWLB
25 year
PWLB
50 year
PWLB
2025/26 4.000%  4.600% 4.825% 5.250% 5.050%
2026/27 3.688% 4.250% 4.425% 4.850% 4.650%
2027/28 3.500% 3.967% 4.167% 4.533% 4.333%
76

Page 77

repayment period of the borrowing. Moving forward, they will remain an option and will
be considered along with other sources of borrowing as required. 
5.5. Alongside fixed rate maturity borrowing, other options such as variable rate or short-
term borrowing or EIP (equal instalments of principal) loans that help mitigate the
impact of the cost of carry are all active considerations. 
5.6. The Council will consider debt rescheduling where appropriate to make savings in
interest costs or to amend the profile of maturing debt to reduce any inherent
refinancing risks, however opportunities will be limited due to the premium that is
charged by the PWLB for the early repayment of debt. 
5.7. The overall strategy for borrowing will be to monitor interest rates, undertake planned 
borrowing at the best time, whilst investigating opportunities where possible to 
improve the structure of our existing loan portfolio. 
5.8. The expected borrowing is detailed in the Prudential Indicators Appendix 1,
paragraphs 1.1. to 1.2. and is summarised below. 
2024/25
Estimate
£ m
2025/26
Estimate
£ m
2026/27
Estimate
£ m
2027/28
Estimate
£ m
Expected Borrowing  141.689 331.050 443.056 526.466 
6. Treasury Management Limits on Activity
6.1. The Treasury Management in the Public Services - Guidance Notes for Local
Authorities details treasury management indicators that are to be reported within the
Treasury Strategy. The update in 2021 introduced a new indicator – The Liability
Benchmark which is covered in Section 6.3 to 6.8. 
6.2. The purpose of the Treasury Management Indicators is to contain the activity of the
treasury function within certain limits, thereby managing risk and reducing the impact
of an adverse movement in interest rates. However, if these are set to be too
restrictive, they will impair the opportunities to reduce costs/improve performance. 
The indicators are detailed below. 
Treasury Management Indicator 1 – Liability Benchmark
6.3. The liability benchmark is a comparison of the existing loan portfolio against committed
and planned borrowing needs, while taking into account how reserves, cash balances
and the need for short-term liquidity affect the future borrowing requirement. 
6.4. The liability benchmark is included in Annex 1 to this strategy. The top line shows the
projected loans capital financing requirement. This is the total outstanding capital
expenditure that has not been paid for from either revenue or capital resources and is
funded by borrowing. 
6.5. The dotted line shows the net loans requirement which takes the loans CFR and
adjusts it for reserves and cash balances that are available to use in lieu of borrowing. 
77

Page 78

6.6. The solid line is the liability benchmark which is equal to the net loans requirement
plus a short term liquidity requirement. The three shaded areas at the bottom of the
chart shows the maturity profile of our actual loan debt outstanding split between
LOBOs, PWLB and temporary borrowing. 
6.7. The Treasury Management Code requires that any mismatches between actual loan
debt outstanding and the liability benchmark are explained. The years where actual
loans are less than the benchmark indicate a future borrowing requirement while any
years where actual loans outstanding exceed the benchmark represent an
overborrowed position which will result in excess cash requiring investment. 
6.8. The liability benchmark for the Council shows a future borrowing requirement. The
Council manages the risks inherent in this by having a view of the future course of
interest rates and a borrowing strategy that aims to minimise borrowing costs and
ensure that these are affordable. The financial impact of borrowing for capital
expenditure has been built into the long-term revenue budget strategy. 
Treasury Management Indicator 2 – Maturity Structure of Borrowing
6.9. By setting limits on the maturity structure of borrowing, the exposure to large
concentrations of debt needing to be replaced at the same time in the future at
currently unknown rates can be limited.  This effectively places a limit on exposure to
longer term interest rate movement. The upper and lower limits for the maturity
structure of borrowing is shown in the table overleaf. 
Maturity Structure of Borrowing 
Upper Limit Lower Limit
Under 12 months 50% 0%
12 months and 24 months 50% 0%
24 months and 5 years 50% 0%
5 years and 10 years 55% 0%
10 years and 20 years 60% 0%
20 years and 30 years 70% 0%
30 years and 40 years 80% 0%
40 years and 50 years 90% 0%
50 years and above 100% 0% 
Treasury Management Indicator 2 – Investments Greater Than 364 Days-
6.10. Limits on the total principal sums invested for greater than 364 days protects against
potential loss that we would suffer if we required to get our money back earlier than
the full term of the investment.  
6.11. This Council will, at any one time, have no more than £10m invested for periods
greater than 364 days, subject to a maximum period of 5 years. 
Interest Rate Risk
6.12. As there is no longer a specific recommended indicator in respect of interest rate
exposures, councils are asked to explain their strategy for managing interest rate risks.  
78

Page 79

6.13. Interest rate risk is the risk that movements in interest rates create an unexpected or
unbudgeted burden on the organisation’s finances, against which the organisation has
failed to protect itself adequately. 
6.14. The Council manages this risk by having a view of the future course of interest rates
and a borrowing strategy that aims to minimise borrowing costs and ensure that these
are affordable. The financial impact of borrowing for capital expenditure has been built
into the long-term revenue budget strategy. 
Credit Risk
6.15. There is no specific recommended indicator in relation to credit risk, although the
Treasury Management Code states that authorities may wish to design and set their
own indicators in relation to this. 
6.16. Details of how South Lanarkshire Council manages credit risk are included in the
Annual Investment Strategy 2025/2026 which is included in Appendix 3 of this report. 
7. Statutory Repayment of Loans Fund Advances
7.1 The Scottish Government introduced The Local Authority (Capital Financing and
Accounting) Scotland Regulations 2016 with effect from 1 April 2016. These
regulations require the statutory loans fund to be administered in accordance with the
2016 Regulations, proper accounting practice and prudent financial management. 
Policy for the Statutory Repayment of Loans Fund Advances
7.2. The Council is required to set out its policy for the statutory repayment of loans fund
advances prior to the start of the financial year. The repayment of loans fund advances
ensures that the Council makes a prudent provision each year to pay off an element
of the accumulated loans fund advances made in previous financial years. 
7.3. A number of options are available to councils so long as a prudent provision is made
each year. The Council is recommended to approve the following policy on the
repayment of loans fund advances:- 
The policy for the repayment of loans fund advances will be to use the most
appropriate method of repayment for individual capital schemes or projects from the
following methods.  
1. Asset life method – loans fund advances will be repaid with reference to the life of
an asset on an annuity basis. 
2. Funding / Income profile method – loans fund advances will be repaid by
reference to an associated income stream. 
7.4. For loans fund advances repaid using the annuity basis, the annual repayment will be
calculated using an appropriate interest rate based on an average cost of funding
capital advances to services. 
7.5. The Council’s strategy for managing debt includes making additional voluntary
repayments. These repayments will be used as a tool to reduce interest costs in the
short to medium term by lowering the Council’s need to borrow. These additional
voluntary repayments will be retained and used to offset higher loans fund repayments
in the long term. All of this helps to ensure that charges to the revenue account remain
prudent and affordable in the long term.  
79

Page 80

Repayment of Loans Fund Advances
7.6. Borrowing to fund the capital programmes result in new loans fund advances and
create a liability to repay those advances from future years’ budgets. The Council is
required to report on the commitment to repay loans fund advances. This is shown in
the following tables. 
General Fund
Opening
Balance
New
Advances  Repayments
Closing
Balance
2024/25 859.048 17.560 -3.730 872.878
2025/2026 872.878 20.346 -4.198 889.026
2026/27 – 2029/30 889.026 43.096 -27.332 904.790
2030/31 – 2034/35 904.790 0.000 -53.053 851.737
2035/36 – 2039/40 851.737 0.000 -107.230 744.507
2040/41 – 2044/45 744.507 0.000 -102.334 642.173
2045/46 – 2049/50 642.173 0.000 -130.605 511.568
2050/51 – 2054/55 511.568 0.000 -166.687 344.881
2055/56 – 2059/60 344.881 0.000 -176.395 168.486
2060/61 – 2064/65 168.486 0.000 -112.135 56.351
2065/66 – 2069/70 56.351 0.000 -35.568 20.783
2070/71 – 2074/75 20.783 0.000 -15.087 5.696
2075/76 – 2079/80 5.696 0.000 -5.696 0.000 
Housing Revenue
Account
Opening
Balance
New
Advances  Repayments
Closing
Balance
2024/25 307.204 18.321 -0.005 325.520
2025/2026 325.520 25.380 -4.420 346.480
2026/27 – 2029/30 346.480 22.030 -30.916 337.594
2030/31 – 2034/35 337.594 0.000 -54.755 282.839
2035/36 – 2039/40 282.839 0.000 -53.459 229.380
2040/41 – 2044/45 229.380 0.000 -48.054 181.326
2045/46 – 2049/50 181.326 0.000 -53.113 128.213
2050/51 – 2054/55 128.213 0.000 -50.685 77.528
2055/56 – 2059/60 77.528 0.000 -40.183 37.345
2060/61 – 2064/65 37.345 0.000 -30.081 7.264
2065/66 – 2069/70 7.264 0.000 -7.264 0.000
80

Page 81

ANNEX 1 
81

Page 82

Appendix 3
Annual Investment Strategy 2025/2026 
1. Background
1.1. Local authority investment activity is regulated by statute. In Scotland the legislation
that local authorities rely on to make investments had consisted of the Trustee
Investments Act 1961 and the Local Government (Scotland) Act 1973. 
1.2. In response to representation from local authorities that the existing regulation was too
prescriptive, provision was made in the Local Government in Scotland Act 2003 for
Scottish Ministers to introduce a new regulatory framework. 
1.3. Section 40 of the Local Government in Scotland Act 2003 provides local authorities
with the power to invest money. This power may be exercised in accordance with
regulations made by Scottish Ministers under this section. 
1.4. Scottish Ministers have, through Consent and Regulations, provided a formal
investment framework, namely The Local Government Investments (Scotland)
Regulations 2010 which came into force on 1 April 2010. 
1.5. The new regulatory framework introduced by regulations made by Scottish Ministers
under Section 40, provides greater autonomy for local authorities in their investment
activities. With this greater freedom comes greater responsibility and the onus is on
local authorities to act prudently regarding their investment and treasury management
activities. 
1.6. Local authorities are required to manage their investments in a way that minimises the
risk to the capital sum and optimises the return on the funds consistent with those
risks. 
1.7. Local authorities are required to prepare an Annual Investment Strategy before the
start of the financial year. 
2. Investment Policy and Strategy
2.1. Scottish Ministers have identified two CIPFA Codes of Practice which local authorities
must have regard to in managing their investments: 
• Treasury Management in the Public Services: Code of Practice and Cross-
Sectoral Guidance Notes (Fully Revised Second Edition 2009) 
• The Prudential Code for Capital Finance in Local Authorities (Fully Revised
Second Edition 2009) 
2.2. The first Code referenced covers the whole range of treasury management issues
including the fundamental principles for making and managing investments. The
second Code deals with capital investment but also includes guidance on Treasury
Management. 
2.3. This Council in its Treasury Management Policy Statement defines its Treasury
Management Activities as: 
The management of the organisation’s investments and cash flows, its banking,
money market and capital market transactions; the effective control of the risks
associated with those activities; and the pursuit of optimum performance consistent
with those risks.
82

Page 83

2.4. The main objective when investing surplus funds will therefore be the security of the
transaction.  The Council must also meet its liquidity requirement and only invest for
the period of time that is prudent.  Finally, and only after consideration of security and
liquidity, the yield that will be gained from the investment will be considered. 
3. Treasury Management Risks
3.1. The CIPFA Treasury Management Code of Practice adopted by the Council includes
a section on Managing Treasury Management Risks, placing Credit and Counterparty
risk at the forefront of treasury risks. 
3.2. South Lanarkshire Council recognises that any investment activity will carry an
element of risk. It is important that risk is identified and controls put in place to limit
those risks. 
3.3. Risks when carrying out investment activities can broadly be categorised as follows: 
Credit Risk: failure to receive back the principal and interest on an investment
in full and on the due date
Liquidity Risk: the maturity or terms of the investment are such that insufficient
cash is available in the short term
Market Risk: the effect of market prices on the value of the investment 
4. Permitted Investments
4.1. Local authorities are required to list and document all types of investments that they
will permit in the financial year. These will be described as the permitted investments
for that local authority. 
4.2. Local authorities are required to state the limits for the amounts which at any time
during the year may be invested in each type of permitted investments, such limit being
applied when the investment is made. 
4.3. For each type of permitted investment, the objectives of that investment are to be
identified along with the associated treasury risks and the controls that will be put in
place to limit those risks. 
4.4. The permitted investments that South Lanarkshire Council have identified for the
financial year 2025/2026 are detailed in Annex 1 to this strategy and listed below: 
• Deposits with the Debt Management Account Deposit Facility
• Deposits with UK Local Authorities
• Deposits with Banks and Building Societies
• Certificates of Deposit with Banks and Building Societies
• UK Government Gilts and Treasury Bills
• AAA Rated Bonds Issued by Multilateral Development Banks
• AAA Rated Money Market Funds
• Loans to Third Parties 
Inclusion as a permitted investment simply allows the Council to use that investment
if considered to be appropriate. It is not necessarily the case that all permitted
investments will be used. 
83

Page 84

5. Risk Management
5.1. The CIPFA Treasury Management Code of Practice adopted by the Council includes
a section on Managing Treasury Management Risks, placing Credit and
Counterparty risk at the forefront of treasury risks. The Code states: 
Credit ratings should only be used as a starting point when considering credit risk.
Organisations should make use of generally available market information, such as the
quality financial press, market data, and information on government support for banks
including the ability and willingness of the relevant government to provide adequate
support. 
5.2. In managing credit and counterparty risk the Council will be required to: 
• Establish a sound diversification policy with high credit quality counterparties
• Set clear minimum credit limits for counterparties.
• Have regard to the credit ratings issued by all three rating agencies and make
decisions based on the lowest rating
• Consider country, sector and group limits
• Regularly review credit ratings and other creditworthiness indicators as
outlined in 5.6 below and act upon forward looking rating warnings 
Deposits with the Debt Management Account Deposit Facility
5.3. Deposits with the Debt Management Office Account Deposit facility provided by HM
Treasury will be continued.  This facility offers the highest security for investments and
deposits will be subject to a maximum period of six months which is the maximum time
allowed by the DMO and no maximum deposit size. 
Deposits with UK Local Authorities
5.4. Deposits with UK local authorities will be permitted subject to a maximum period of
three years and a maximum deposit size of £20m for up to 364 days and £10m beyond
this. 
5.5. Before placing a deposit with a local authority, an internet search will be carried out to
ensure that there are no financial concerns regarding the local authority that may
cause reputational damage to this Council through association. 
Deposits and Certificates of Deposit with Banks and Building Societies
5.6. The following minimum thresholds will be applied to all deposits with banks and
building societies, including Certificate of Deposits. 
Rating Agency Long Term
Rating
Maximum Deposit
Fitch A- £20m
Moody’s A3 £20m
Standard and Poors A- £20m 
5.7. Prior to depositing funds with any bank or building society, checks will be made with
the Council’s treasury adviser, Link Asset Services, that the institution is considered
safe and that any deposit conforms to their recommended time duration as determined
by their Rating Methodology.  This methodology uses credit ratings, rating watches
and outlooks and credit default swap (CDS) prices to establish a suggested time
duration for deposits.
84

Page 85

5.8. Currently all deposits are with UK institutions.  Non-UK banks would only be
considered if they meet our strict criteria and are recommended by our advisers.  Any
one foreign country would carry a limit of £20m deposits. 
5.9. If two or more organisations in the same group meet the criteria detailed in 5.5. then
a group limit of £20m will be applied. 
5.10. Deposits with banks or building societies will be restricted to 364 days. 
5.11. The existing Counterparty policy sets out a sound approach to depositing cash in
normal market circumstances.  Whilst this policy still stands, the Executive Director of
Finance and Corporate Resources may consider temporarily restricting deposits to
those counterparties considered of higher credit quality than the minimum criteria set
out in the policy. 
5.12. Examples of these restrictions would be greater use of higher rated institutions;
increased use of the DMO account and restricting the term of deposits as appropriate. 
5.13. Operational banking will continue with our contracted provider. Any deposits with
banks or building societies will continue to meet the criteria set in 5.6. 
UK Government Gilts and Treasury Bills
5.14. UK Government Gilts and Treasury Bills are bonds issued by HM Treasury.
Purchasing these bonds is a means of investing in the UK Government. The UK
Government has never failed to make interest or principal payments on these bonds. 
5.15. Investments in UK Government Gilts and Treasury Bills carry very little credit risk as
they are investments in the UK Government.  Gilts and Treasury Bills are marketable,
and the price fluctuates from day to day. There is therefore the potential of capital loss
if sold ahead of maturity.  Gilts and Treasury Bills will be bought by the Council with
the intention of holding them to maturity thereby mitigating market risk.  There will be
no maximum limit to the amount that will be invested in UK Gilts or Treasury Bills for
maturities of less than one year. For Gilts with maturities in excess of one year a limit
of £10m will be applied and no maturity will exceed five years. 
AAA Rated Bonds Issued by Multilateral Development Banks
5.16. These are bonds issued by supranational institutions such as the World Bank or the
European Investment Bank. 
5.17. Investments in AAA rated bonds issued by Multilateral Development Banks carry very
little credit risk as they are backed by several Sovereign States. These bonds carry
market risk as their price fluctuates from day to day. There is therefore the potential of
capital loss if sold ahead of maturity.  These bonds will be bought by the Council with
the intention of holding them to maturity, thereby mitigating market risk.  The maximum
amount that will be invested in AAA rated bonds issued by Multilateral Development
Banks is £10m with a maximum period of five years. 
5.18. Any investments in these bonds would only be undertaken after careful consideration
and with advice from our advisers to ensure security of our investments. 
85

Page 86

AAA Rated Money Market Funds
5.19. Investments in Money Market Funds will be limited to those funds rated as AAAmmf
by Fitch, Aaa by Moody’s or AAAm by Standard and Poor’s. In the event that the
Money Market Fund is rated by more than one credit rating agency, each rating must
meet the set criteria. 
5.20. In addition to the credit rating, Money Market Funds will also be assessed for suitability
on fund size, the strength of the custodian and the stability of invested capital. 
5.21. Selection of suitable Money Market Funds will be undertaken in consultation with our
advisers. 
5.22. Investments in Money Market Funds will be restricted to 0.5% of the Money Market
Fund size and to no more than £10m in any individual Money Market Fund. 
5.23. Investments in Sterling Government Money Market Funds which only invest in Sterling
denominated debt securities issued by the UK Government will be restricted to 2% of
the Money Market Fund size and to no more than £10m in any individual Money Market
Fund. 
Loans to Third Parties
5.24. Any new types of loans to third parties should be approved by The Finance and
Corporate Resources Committee with full consideration of the service rationale behind
the loan and the likelihood of partial or full default and the impact that this will have on
service budgets. 
Liquidity Risk
5.25. In order to manage liquidity risk, the Council will endeavour to maintain a minimum
balance of £5m in bank accounts and money market funds with instant access (same
day notice account). This is dependent on these facilities continuing to be provided by
the banks and subject to our minimum lending criteria. 
5.26. In addition to retaining a balance of deposits on instant access, South Lanarkshire
Council will maintain an appropriate overdraft facility. 
5.27. Longer term investments will only be considered where the Council’s liquidity
requirements are ensured and an assessment of liquidity risk has been carried out.
No more than £10m of investments at any one time will be for a period in excess of
364 days. 
6. Borrowing In Advance
6.1. Borrowing in advance may be taken if it is considered appropriate, for example if
interest rates were expected to increase significantly. 
6.2. The Council will not borrow more than or in advance of its needs purely in order to
profit from the investment of the extra sums borrowed. Any decision to borrow in
advance will be within forward approved Capital Financing Requirement estimates and
will be considered carefully to ensure that value for money can be demonstrated and
that the Council can ensure the security of such funds. 
86

Page 87

6.3. The risks of holding increased levels of deposits and investments would be managed
in accordance with section 5 above. The Council has unlimited access to using the
DMO Deposit Facility where necessary. This facility offers the highest security for
investments. 
7. Investment Projection 2025/2026
7.1. It is estimated that the level of investments during 2025/2026 will be minimal as
reserves and working capital are used to reduce the Council’s borrowing requirement. 
7.2. Regardless of the level of deposits, the main consideration when investing surplus
funds will be the security of the transaction.  The Council must also meet its liquidity
requirement and only invest for the period of time that is prudent.  Finally, and only
after consideration of security and liquidity, the yield that will be gained from the
investment will be considered. 
8. Prudential Indicators
8.1. The regulations require that the Annual Investment Strategy contains details of the
relevant prudential indicators for investments. 
8.2. The Treasury Management Code requires local authorities to set an upper limit for
each forward financial year period for investments longer than 364 days. The purpose
is to contain the exposure to the possibility of loss that might arise as a result of having
to seek early repayment of principal sums invested.   
8.3. No more than £10m may be invested for periods in excess of 364 days and that the
maximum period for any investment is 5 years. 
9. Common Good Investments
9.1. The regulations require local authorities to identify separately the permitted
investments relating to the Common Good. 
9.2. All investments relating to the Common Good funds administered by South
Lanarkshire Council are cash investments in South Lanarkshire Council. These
investments are not considered to have any significant risk attached. 
10. Responsible Investing
10.1. Until there is an established methodology that can be used to assess an organisation’s
approach to climate change, sustainability and the environment, the Council will
continue to minimise its deposits with banks while managing Treasury Management
risks. 
10.2. Deposits with banks will be limited to instant access call accounts where the council’s
money cannot be used for investment in any projects.
87

Page 88

ANNEX 1 
Permitted
Investment
Treasury Risks Mitigating Controls Limits
Deposits with the
Debt Management
Account Deposit
Facility
This is a deposit with
the UK Government
and so credit risk is very
low. 
Liquidity risk has to be
considered as deposits
can only be broken with
the agreement of the
counterparty and
penalties may apply. 
There is no market risk
as the principal sum
invested is not affected
by market prices.
There are no
mitigating controls
required. 
There is no maximum
monetary limit. 
A maximum term of
deposit of six months
as set by the Debt
Management Office.
Deposits with UK
Local Authorities and
other bodies defined
as local authorities in
the Local
Government Scotland
Act 2003
(And Equivalent
English Act)
These are considered
to be quasi UK
Government investment
and as such credit risk
is very low. 
Liquidity risk has to be
considered as deposits
can only be broken with
the agreement of the
counterparty and
penalties may apply. 
There is no market risk
as the principal sum
invested is not affected
by market prices.
There are no
mitigating controls
required. 
The maximum
deposit with any local
authority will be £20m
for deposits less than
one year. 
Deposits in excess of
one year will be
subject to a maximum
term of deposit of
three years and be
limited to £10m.
Deposits with Banks
and Building
Societies
These tend to be low
risk but credit risk will
be higher than deposits
placed with the DMO or
UK local authorities. 
Liquidity risk has to be
considered as deposits
can only be broken with
the agreement of the
counterparty and
penalties may apply. 
There is no market risk
as the principal sum
invested is not affected
by market prices. 
The counterparty
selection criteria
restricts lending only
to high quality
counterparties,
measured initially by
credit ratings from
Fitch, Moody’s and
Standard and Poors. 
Additional indicators
of creditworthiness
will also be
considered prior to
placing any deposits. 
Liquidity risk can be
controlled by the use
of instant access call
accounts. 
The maximum
deposit with any bank
or building society will
be £20m. 
A maximum term of
deposit of 364 days.
88

Page 89

Certificates of Deposit
with Banks and
Building Societies
These are short to
medium term dated
marketable securities
issued by financial
institutions. 
These tend to be low
risk investments but
credit risk will be higher
than deposits placed
with the DMO or UK
local authorities. 
Liquidity risk is lower
than placing a deposit
with a Bank or Building
Society as these can be
sold on the market. 
There is a risk of capital
loss arising from selling
ahead of maturity.
The counterparty
selection criteria
restricts lending only
to high quality
counterparties,
measured initially by
credit ratings from
Fitch, Moody’s and
Standard and Poor’s. 
Additional indicators
of creditworthiness
will also be
considered prior to
using this type of
instrument. 
Market risk would be
mitigated by holding
the instrument to
maturity.
The maximum
investment with any
bank or building
society will be £20m. 
A maximum period of
investment of 364
days.
UK Government Gilts
and Treasury Bills
These are marketable
securities issued by the
UK Government and as
such credit risk is very
low. 
Liquidity risk is very low
as there is a huge
market for Gilts and
Treasury Bills 
There is a risk of capital
loss arising from selling
ahead of maturity.
There are no
mitigating controls
required for credit risk
as the investment is
with the UK
Government. 
Market risk would be
mitigated by holding
the instrument to
maturity.
There is no maximum
limit to investments in
UK Gilts or Treasury
Bills for maturities
less than one year
and a limit of £10m
for maturities greater
than one year. 
The maximum period
of investment will be
five years.
AAA Rated Bonds
Issued by Multilateral
Development Banks
These are bonds issued
by supranational bodies
such as the European
Investment Bank or
World Bank and as a
result are backed by
several sovereign
states and as such
credit risk is very low. 
Liquidity risk is very low
as there is a large
market for
Supranational Bonds. 
There is a risk of capital
loss arising from selling
ahead of maturity.
As the investment is
effectively spread
across a number of
sovereign states, the
Council will mitigate
the credit risk of
holding such bonds
by considering the
sovereign rating of the
underlying sovereign
states and only
holding bonds that
have a AAA rating. 
Market risk would be
mitigated by holding
the instrument to
maturity.
The maximum
amount that will be
invested in AAA
Rated Bonds issued
by Multilateral
Development Banks
is £10m. 
The maximum period
of investment will be
five years. 
89

Page 90

AAA Rated Money
Market Funds
Money market funds
are pooled funds that
invest in short-term
money market
instruments and other
debt instruments. 
The underlying
investments are
diversified and Credit
risk, liquidity risk and
market risk are all
very low. 
Investments in these
MMFs are highly liquid
(same day liquidity).
Money Market Funds
will only be used where
they have obtained a
AAA rating from the
credit rating agencies. 
In addition to the credit
rating, Money Market
Funds will also be
assessed for suitability
on fund size, the
strength of the
custodian and the
stability of invested
capital.
Investments in Money
Market Funds will be
limited to 0.5% of the
Money Market Fund
Balance and to no
more than £10m in
any one Fund. 
Investments in
Sterling Government
Money Market Funds
which only invest in
Sterling denominated
debt securities issued
by the UK
Government will be
restricted to 2% of the
Money Market Fund
size and to no more
than £10m in any
individual Money
Market Fund. 
Loans to Third
Parties
These are service
investments which
may exhibit credit risk
and are likely to be
highly illiquid.
Any new types of loans
to third parties should
be approved by
Members through the
appropriate Committee
with full consideration
of the service rationale
behind the loan and the
likelihood of partial or
full default and the
impact that this will
have on service
budgets. 
90