Democracy Spraffa

Agenda Document Pack - Social Work Resources Committee - 27/09/2023

South Lanarkshire Council · 27 September 2023
Back to Social Work Resources Committee — 27 September 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Wednesday, 20 September 2023 
Dear Councillor 
Social Work Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 27 September 2023
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Margaret B Walker (Chair), Catherine McClymont (Depute Chair), Joe Fagan (ex officio), Alex
Allison, John Bradley, Walter Brogan, Robert Brown, Archie Buchanan, Mathew Buchanan, Janine
Calikes, Maureen Devlin, Mary Donnelly, Allan Falconer, Elise Frame, Celine Handibode, Graeme
Horne, Mark Horsham, Martin Hose, Eileen Logan, Hugh Macdonald, Richard Nelson, Carol
Nugent, John Ross, Graham Scott, David Watson, Kirsty Williams 
Substitutes
John Anderson, Maureen Chalmers, Margaret Cooper, Poppy Corbett, Margaret Cowie, Geri Gray,
Susan Kerr, Ross Lambie, Richard Lockhart, Elaine McDougall, Mark McGeever, Davie McLachlan,
Bert Thomson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Social Work Resources Committee held on 28
June 2023 submitted for approval as a correct record.  (Copy attached) 
3 - 10 
Monitoring Item(s) 
3 Social Work Resources - Revenue Budget Monitoring 2023/2024
Joint report dated 19 September 2023 by the Executive Director (Finance and
Corporate Resources) and Director, Health and Social Care.  (Copy attached) 
11 - 18 
4 Social Work Resources - Capital Budget Monitoring 2023/2024
Joint report dated 7 September 2023 by the Executive Director (Finance and
Corporate Resources) and Director, Health and Social Care.  (Copy attached) 
19 - 22 
5 Social Work Resources – Workforce Monitoring – May to July 2023
Joint report dated 24 August 2023 by the Executive Director (Finance and
Corporate Resources) and Director, Health and Social Care.  (Copy attached) 
23 - 30 
6 Update on the 2022/2023 Risk Register and Risk Control Plan
Report dated 22 August 2023 by the Director, Health and Social Care.  (Copy
attached) 
31 - 44 
Item(s) for Decision 
7 Strengthening Arrangements for Self-Directed Support
Joint report dated 27 August 2023 by the Director, Health and Social Care and
Executive Director (Finance and Corporate Resources).  (Copy attached) 
45 - 50 
Urgent Business 
8 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
2

Page 3

SOCIAL WORK RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 28 June 2023 
Chair:
Councillor Margaret B Walker 
Councillors Present:
Councillor John Anderson (substitute for Councillor Hugh Macdonald), Councillor Walter Brogan,
Councillor Robert Brown, Councillor Archie Buchanan, Councillor Mathew Buchanan, Councillor
Janine Calikes, Councillor Margaret Cowie (substitute for Councillor Eileen Logan), Councillor
Maureen Devlin, Councillor Mary Donnelly, Councillor Allan Falconer, Councillor Elise Frame,
Councillor Celine Handibode, Councillor Graeme Horne, Councillor Mark Horsham, Councillor
Martin Hose, Councillor Cal Johnston-Dempsey, Councillor Richard Lockhart (substitute for
Councillor Alex Allison), Councillor Catherine McClymont (Depute), Councillor Carol Nugent,
Councillor Graham Scott, Councillor David Watson 
Councillors' Apologies:
Councillor Alex Allison, Councillor John Bradley, Councillor Joe Fagan (ex officio), Councillor Eileen
Logan, Councillor Hugh Macdonald, Councillor Richard Nelson, Councillor John Ross 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Resources); E McPake, HR Business Manager; L O’Hagan, Finance
Manager (Strategy); T Slater, Administration Adviser; M M Wilson, Legal Services Manager; L
Wyllie, Administration Assistant
Health and Social Care/Social Work Resources
S Sengupta, Director; I Beattie, Head of Health and Social Care (Hamilton and Clydesdale); G
Booth, Justice Service Manager; C Borden, Justice Operations Manager; C Cunningham, Head of
Commissioning and Performance; L Purdie, Head of Children and Justice Services 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Social Work Resources Committee held on 3 May 2023 were
submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Social Work Resources – Revenue Budget Monitoring 2022/2023 
A joint report dated 12 June 2023 by the Executive Director (Finance and Corporate Resources)
and Director, Health and Social Care was submitted comparing actual expenditure for the period
1 April 2022 to 31 March 2023 against budgeted expenditure for 2022/2023 for Social Work
Resources.
2
3

Page 4

As at 31 March 2023, there was an unplanned underspend of £5.635 million before proposed
transfers to reserves, as detailed in Appendix A to the report.  Following transfers to reserves,
as detailed in appendices B to E of the report, which had been approved by the Executive
Committee at its meeting on 21 June 2023, the Resource position was a breakeven position.  It
was noted that this was before taking into account the impact of the Home Carers’ job
evaluation.  The transfers to reserves had arisen from an unplanned underspend within Adult
and Older People Services.  There were also unplanned underspends within Performance and
Support Services and Justice Services which had been offset by an overspend in Children and
Family Services. 
Included within the underspend within Adult and Older People Services was a commitment in
relation to the Integration Joint Board (IJB).  The budget delegated to the IJB had underspent by
£7.510 million and the Council had agreed to the IJB retaining £1.424 milling of this underspend
within its reserves at probable outturn. This had increased to £1.875 million and was earmarked
for future care costs in line with the approach to integrating health and social care budgets.  Of
the unplanned underspend remaining, it was agreed at probable outturn, that £5.635 million
would be transferred to a Council reserve to be used in 2023/2024 to support Children and
Family Services’ pressures. 
Virements were proposed to realign budgets, which were also detailed in the appendices to the
report. 
Although there were no implications within this report from the outcome of the Home Carers’ job
evaluation, this would result in significant recurring costs and work was ongoing to agree a
recovery plan.  Information was provided on the process in place for the IJB to deal with such an
eventuality once its budget had been set.  Information was also provided on the implications for
the Council following the review of the implementation date for back pay for Home Carers which
would be October 2020.  Those costs would be included within the financial position for
2022/2023.  As the IJB would not now underspend, alternative funding would require to be
identified to support Children and Family Services’ costs into 2023/2024. 
An officer responded to a member’s question in relation to budget levels and adjustments. 
The Committee decided: 
(1) that the breakeven position as at 31 March 2023, after transfers to reserves, as detailed in
Appendix A to the report, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of 3 May 2023 (Paragraph 3) and Minutes of the Executive Committee of
21 June 2023 (Paragraph 3)] 
4 Social Work Resources – Revenue Budget Monitoring 2023/2024 
A joint report dated 12 June 2023 by the Executive Director (Finance and Corporate Resources)
and Director, Health and Social Care was submitted comparing actual expenditure for the period
1 April to 19 May 2023 against budgeted expenditure for 2023/2024 for Social Work Resources. 
As at 19 May 2023, there was a breakeven position against the phased budget.  The Resource
position was outlined in Appendix A to the report.
4

Page 5

Budget pressures were ongoing within Children and Family Services and £5.635 million had
been planned to be available this financial year to support those pressures.  This was to be
transferred to a Council reserve following an IJB underspend.  In addition, a further £3.600
million was available from a balance of central funding to contribute towards the residual
pressures in 2023/2024. 
As reported in the previous report to Committee on the Revenue Budget for 2022/2023,
information was provided on the implications of the outcome of the Home Carers’ job evaluation
and the review of the implementation date for back pay.  As the Integration Joint Board would
not now underspend, alternative funding would require to be identified to support Children and
Family Services’ costs into 2023/2024.  The full costs of the funding package would be
quantified and reported to the Executive Committee at its meeting on 16 August 2023. 
Virements were proposed to realign budgets, which were detailed in appendices B to E to the
report. 
An officer responded to a member’s question in relation to the arrangements for setting a budget
in relation to the staffing establishment. 
The Committee decided: 
(1) that the breakeven position as at 19 May 2023 and the forecast to 31 March 2024 of a
breakeven position, as detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements be approved. 
5 Social Work Resources – Capital Budget Monitoring 2022/2023 
A joint report dated 7 June 2023 by the Executive Director (Finance and Corporate Resources)
and Director, Health and Social Care was submitted advising of progress on the Social Work
Resources’ capital programme for 2022/2023 and summarising the expenditure position at 31
March 2023. 
The capital programme for Social Work Resources for 2022/2023 was £3.903 million.  Total
spend to 31 March 2023 was £4.210 million.  This represented a position of £0.307 million
ahead of profile and mainly reflected the timing of payments on the Community Alarm and
SWiSplus Replacement projects. 
The overspends on those projects would carry forward and be offset by the funding available. 
The Committee decided: that the Social Work Resources’ capital programme of
£3.903 million, and expenditure for the year of £4.210
million, be noted. 
[Reference: Minutes of 3 May 2023 (Paragraph 4)] 
6 Social Work Resources – Capital Budget Monitoring 2023/2024 
A joint report dated 7 June 2023 by the Executive Director (Finance and Corporate Resources)
and Director, Health and Social Care was submitted advising of progress on the Social Work
Resources’ capital programme for 2023/2024 and summarising the expenditure position at 19
May 2023.
5

Page 6

The capital programme for Social Work Resources for 2023/2024 was £2.030 million and had
been updated to include budget carried forward from 2022/2023.  Spend as at 19 May 2023 was
£0.323 million, which was in line with that anticipated. 
The Committee decided: that the Social Work Resources’ capital programme of
£2.030 million, and expenditure for the year of £0.323
million, be noted. 
7 Social Work Resources – Workforce Monitoring – March and April 2023 
A joint report dated 25 May 2023 by the Executive Director (Finance and Corporate Resources)
and Director, Health and Social Care was submitted on the following employee information for
Social Work Resources for the period March and April 2023:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 11 March 2023 
Officers responded to members’ questions in relation to various aspects of the report and
undertook to:- 
 provide more detailed information on accidents/incidents separately to members, if
requested, as this could not be included in a public report
 provide an update to members on the timescale for issuing the survey on the Care at
Home scheduling system, which had been delayed due to various issues including the
Home Carers’ job evaluation process 
The Committee decided: that the report be noted. 
[Reference: Minutes of 3 May 2023 (Paragraph 5)] 
8 Update on the 2022/2023 Risk Register and Risk Control Plan 
A report dated 5 June 2023 by the Director, Health and Social Care was submitted on risk
management arrangements and the Risk Register for Social Work Resources. 
The Resource had followed Council guidance in developing, monitoring and updating its Risk
Register on an ongoing basis.  The Register had been developed to ensure that the Resource
was fully aware of the main risks that it had, was able to prioritise those risks and had controls in
place to eliminate or minimise the impact of risk. 
The scoring matrix and definitions for likelihood and impact were outlined in Appendix 1 to the
report.  This had resulted in risks being scored between 1 to 25 (low to very high).  Risks were
scored on their inherent risk (risk if nothing was done) and their residual risk (risk after applying
controls).
6

Page 7

At its meeting on 3 May 2023, the Social Work Resources Committee agreed the current top 5
risks impacting on the delivery of Social Care Services, each of which remained unchanged
following review:- 
 workforce availability and capacity (lack of capacity and skills to meet increased service
demands) 
 meeting public protection and legislative duties (combined legislation/statutory duties
public protection, Care Inspectorate/Self-directed Support (SDS))
 market and provider capacity (procurement/supply chain) 
 funding and budgetary pressures (reduction in funding/increased costs) 
 winter demand pressures (emergency response) 
Although the top risks remained unchanged, a number of factors had materialised that impacted
on those risks that related to:- 
 the outcome of the Care at Home job evaluation which would require a recurring funding
solution
 ongoing pressures within the children’s social work element of the Children and Justice
Services’ budget
 care home providers’ market stability, both general (related to ongoing negotiations on the
National Care Home Contract) and specific to individual care homes (those subject to
external review or where the owner had placed them in administration) 
Appendix 2 to the report provided further detail on each of the top risks, together with the
inherent and residual risk scores and sample controls. 
Officers responded to members’ question in relation to:- 
 work to improve workforce availability and capacity
 the challenges with recruitment and retention
 the progress of the Lanarkshire Care Academy, a report on which would be submitted to
the next meeting of the Committee 
The Committee decided: 
(1) that the report be noted; and 
(2) that the top risks for Social Work Resources be approved. 
[Reference: Minutes of 3 May 2023 (Paragraph 6)] 
9 Locality Based Social Work Services’ Modernisation Programme 
A joint report dated 30 March 2023 by the Director, Health and Social Care and Executive
Director (Finance and Corporate Resources) was submitted on proposals to update the model of
service delivery across localities. 
Information was provided on the current structure and challenges faced by the workforce within
Social Work Resources’ 4 localities which provided essential services, undertaking the Council’s
statutory duties relating to Assessment and Care Management, Mental Health and Public
Protection. 
Nationally, recruitment and staff retention had been challenging for a number of years and within
the Social Work Resources’ Risk Register, Service Demand Pressures and Workforce
Availability had been reported as a Very High risk since the pandemic.
7

Page 8

The Resource had developed a Sustainability and Value Option Screening Scales, attached as
Appendix 1 to the report, to provide oversight and ensure that public protection duties were a
priority. 
Consultation and engagement events took place in March 2023 across Children and Justice
Services.  A report on the feedback from those events, attached as Appendix 2 to the report,
demonstrated a need to modernise, redesign and demonstrate a commitment to recruitment and
retention in the workforce.  It also recognised that the biggest area of risk was in locality settings
and settings primarily responsible for delivering public protection arrangements.  Those issues
and challenges were also seen across Adult and Older People Servies. 
Information was provided on the Three Horizons Design Proposal, developed as a result of
service demands, and the service model improvements required.  The following changes to
Social Work Resources’ staffing establishment were proposed to support this redesign:- 
 for the Health and Social Care Partnership Social Work:-
 that 32 Full-time Equivalent (FTE)  posts of Operations Manager on Grade 4, Level
2-5, SCP 82-88 (£46,298 to £50,659) be added to the staffing establishment
 that 36 FTE posts of Team Leader on Grade 3, Level 8, SCP 79-80 (£44,309 to
£44,966) be deleted from the staffing establishment
 that 4 FTE posts of Planning and Performance Officer on Grade 3, Level 4, SCP 72-
74 (£40,276 to £41,115) be added to the staffing establishment 
 for the Commissioning and Quality Assurance Team:-
 that 1 FTE post of Service Manager on Grade 5, Level 1-5, SCP 96-103 (£57,028 to
£63,233) be added to the staffing establishment 
 for Children and Family Services
 that 20 FTE posts of Operations Manager on Grade 4, Level 2-5, SCP 82-88
(£46,298 to £50,659) be added to the staffing establishment
 that 22.5 FTE posts of Team Leader on Grade 3, Level 8, SCP 79-80 (£44,309 to
£44,966) be deleted from the staffing establishment 
 for Justice Services
 that 2 FTE posts of Fieldwork Manager on Grade 5, Level 1, SCP 96-97 (£57,028 to
£57,904) be added to the staffing establishment
 that 3 FTE posts of Operations Manager on Grade 4, Level 2-5, SCP 82-88 (£46,298
to £50,659) be added to the staffing establishment
 that 4 FTE posts of Team Leader on Grade 3, Level 8, SCP79-80 (£44,309 to
£44,966) be deleted from the staffing establishment 
The cost of the proposals would be met from within existing budget provision, as detailed in the
report. 
Officers responded to members’ questions in relation to:- 
 an assurance that consultation would be undertaken with trade unions and staff
 the implications of the change of Social Worker roles to Senior Practitioner 
The Committee decided: 
(1) that the report be noted; 
(2) that the proposals to progress changes to the operational structure across social work
services be approved; and
8

Page 9

(3) that the amendments to the Social Work Resources’ staffing establishment, as detailed in
the report, be approved. 
10 Reducing Drug Deaths: The South Lanarkshire Alcohol and Drug Problem-Solving
Court 
A joint report dated 17 April 2023 by the Director, Health and Social Care and Executive Director
(Finance and Corporate Resources) was submitted advising of the establishment of a 2-year
test of change Alcohol and Drug Problem-Solving Court. 
The Problem-Solving Court had been developed by Justice Social Work Services in partnership
with Hamilton Sheriff Court.  The aim of the project was to adopt a public health approach to
supporting those in conflict with the law whose offending related to substance misuse, with the
long-term aim of permanently exiting the justice system. 
Information was provided on:- 
 South Lanarkshire Alcohol and Drug Partnership (ADP) analysis data that had informed
the need for this dedicated court approach
 how the Problem-Solving Court would operate
 the objectives of the project which aligned with the national Logic Model for reducing drug
deaths and harms
 the Justice Support Worker pilot evaluation, attached as an appendix to the report 
To support this initiative, it was proposed to add the following posts to the Social Work
Resources’ staffing establishment for an initial period of 2 years, with the posts being recruited
to permanent contracts and staff redeployed within the service at the end of the pilot if a
permanent funding solution had not been secured:- 
 2 Full-time Equivalent (FTE) posts of Social Worker on Grade 3, Level 4, SCP 72-74
(£40,275 to £41,115)
 0.5 FTE post of Justice Social Work Team Leader on Grade 3, Level 8, SCP 79-80
(£44,309 to £44,966) 
The cost of the proposal was £0.302 million per annum and funding would be provided from the
CORRA Improvement Fund, South Lanarkshire ADP and the Section 27 Justice budget, as
detailed in the report. 
Officers responded to members’ questions in relation to:- 
 monitoring and evaluation of the initiative
 core funding and capacity 
The Committee decided: 
(1) that the report be noted; 
(2) that the findings of the independent evaluation of the Justice Support Worker pilot and how
it had informed the Alcohol and Drug Problem-Solving Court be noted; and 
(3) that the posts, as detailed in the report, be added to the Social Work Resources’ staffing
establishment for an initial period of 2 years.
9

Page 10

11 Implementing Medication Assisted Treatment (MAT) Standards in South
Lanarkshire - Update
A report dated 31 May 2023 by the Director, Health and Social Care was submitted providing an
update on the progress of the local implementation of Medication Assisted Treatment (MAT)
Standards for people with problematic drug use. 
Information was provided on the number of drug misuse deaths registered in Scotland in 2021
which had increased substantially over the past few decades. 
There had also been a change in drug use and potential for increased levels of harm which had
resulted in the production of MAT Standards, attached as Appendix 1 to the report. The MAT
Standards were produced by the Drug Death Task Force, on behalf of the Scottish Government,
in response to this emergent public health crisis. 
The Committee decided: that the report be noted. 
12 Notification of Contracts Awarded - 1 October 2022 to 31 March 2023 
A report dated 17 May 2023 by the Director, Health and Social Care was submitted on contracts
awarded by Social Work Resources in the period 1 October 2022 to 31 March 2023. 
In terms of Standing Order Nos 21.8 and 22.5 of the Standing Orders on Contracts, Resources
were required to notify the relevant Committee of contracts awarded in excess of £50,000. 
Details of the contracts awarded by Social Work Resources were provided in the appendix to
the report. 
The Committee decided: that the report be noted. 
13 Urgent Business 
There were no items of urgent business. 
10

Page 11

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 27 September 2023
Report by: Executive Director (Finance and Corporate Resources)
Director, Health and Social Care  
Subject: Social Work Resources - Revenue Budget Monitoring
2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2023 to 11 August 2023 for Social Work Resources
 provide a forecast for the year to 31 March 2024.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[re
(1) the position on the Social Work Resources’ revenue budget, as detailed in
Appendix A of the report, and the forecast to 31 March 2024 as detailed in
section 5.7, be noted; and
(2) that the proposed budget virements be approved.
[1recs]
3. Background
3.1. This is the second revenue budget monitoring report presented to the Social Work
Resources Committee for the financial year 2023/2024. 
3.2. The report details the financial position for Social Work Resources in Appendix A,
and then details the individual services, along with variance explanations, in
Appendices B to E. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. As at 11 August 2023, there is a breakeven position against the phased budget. 
5.2. Children and Families:  As detailed in the previous report, budget pressures within
Children and Families are continuing into 2023/2024 in relation to residential
placements, fostering and kinship care, some of which is a legacy from the
pandemic. 
3
11

Page 12

5.3. As previously advised to Social Work Committee (28 June 2023), there is one-off
funding identified totalling £9.2 million, and this is available this financial year to
contribute towards these residual Children and Families’ pressures. 
5.4. The Children and Families position as at 11 August 2023 assumes funding will be
available and will be drawn down later in the financial year, as required.  The
Resource are working towards managing the overall budget pressure in Children and
Families by 2024/2025. 
5.5. The period 5 overspend position on Children and Families (£0.140m) is currently
being managed by an underspend on Performance and Support and Justice
Services. 
5.6. Adults and Older People:  As previously advised, Within Adult and Older People,
the outcome of the Job Evaluation exercise for Home Carers will result in recurring
costs of approximately £7 million from 2023/2024.  These costs are not included in
the IJB budget set for 2023/2024.  As at 11 August, costs of £2.4 million have been
incurred in relation to the cost of the grade changes.  This is shown under Employee
Costs in Appendix C but does not show as a net overspend as there is sufficient
budget available at this stage in the financial year to cover the additional costs
incurred to date. 
5.7. Officers within the IJB have been looking to identify recurring funding solutions.  A
budget recovery plan presented to the IJB on 19 September was not agreed.  To
manage the spend position this year, work will be required by the IJB Chief Officer
and Chief Financial Officer, in conjunction with the Council’s officers, to address this. 
This is likely to be achieved, in the short term, through management controls
pending further decisions to be taken by the IJB to balance the in-year budget. 
6.      Climate Change, Sustainability and Environmental Implications
6.1.     There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. There are inflationary and budget pressures including utilities (as well as
general inflation pressures) this year which increase the risk of overspend however
these have mitigated through the IJB financial plan for 2023/24. The risk is managed
through four weekly Budget Monitoring Meetings at which any variance is analysed.
In addition, the probable outturn exercise ensures early warning for corrective action
to be taken where appropriate. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no impact
assessment is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
12

Page 13

Paul Manning
Executive Director (Finance and Corporate Resources) 
Soumen Sengupta
Director, Health and Social Care 
19 September 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 11 August 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Graham Booth, Finance Manager
Ext:  2699 (Tel:  01698 452699)
Email: Graham.Booth@southlanarkshire.gov.uk
13

Page 14

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Social Work Resources Committee: Period Ended 11 August 2023 (No.5) 
Social Work Resources Summary 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
11/08/23
Actual 
11/08/23
Variance 
11/08/23 
%
Variance  
11/08/23
Note 
£000  £000 £000 £000 £000 £000   
Budget Category         
Employee Costs 108,492 108,492 0 36,211 38,114 (1,903) Over -5.3% 
Property Costs 4,372 4,372 0 1,147 1,145 2 Under 0.2% 
Supplies & Services 5,879 5,879 0 1,870 1,912 (42) Over -2.2% 
Transport & Plant 4,685 4,685 0 729 753 (24) Over -3.3% 
Administration Costs 1,967 1,967 0 304 311 (7) Over -2.3% 
Payments to Other Bodies 24,073 24,073 0 8,875 8,492 383 Under 4.3% 
Payments to Contractors 135,972 134,972 0 47,765 46,331 1,434     Under          3.0% 
Transfer Payments 3,060 3,060 0 1,593 1,624 (31) Over -1.9% 
Financing Charges 403 403 0 15 19 (4) Over -26.7% 
Total Controllable Exp. 288,903 288,903 0 98,509 98,701 (192) Over -0.2% 
Total Controllable Inc. (74,184) (74184) 0 (11,468) (11,660) 192 Under
recovered -1.7% 
Net Controllable Exp. 214,719 214,719 0 87,041 87,041 0 - 0.0% 
Variance Explanations 
Variance explanations are shown in Appendices B-E. 
Budget Virements 
Budget virements are shown in Appendices B-E. 
14

Page 15

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Social Work Resources Committee: Period Ended 11 August 2023 (No.5) 
Children and Families Services 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
11/08/23
Actual 
11/08/23
Variance 
11/08/23 
%
Variance
11/08/23
Note 
£000  £000 £000 £000 £000 £000   
Budget Category         
Employee Costs 18,572 18,572 0 6,424 6,253 171 Under 2.7% 1, a,
b, 
Property Costs 460 460 0 99 104 (5) Over -5.1% 
Supplies & Services 585 585 0 142 178 (36) Over -25.4% c
Transport & Plant 626 626 0 183 206 (23) Over -12.6% 
Administration Costs 319 319 0 143 150 (7) Over -4.9% c
Payments to Other Bodies 9,283 9,283 0 3,204 3,301 (97)      Over -3.0% 2, b,
c, d
Payments to Contractors 5,483 5,483 0 3,678 3,868 (190) Over -5.2% 3, a,
d
Transfer Payments 3,047 3,047 0 1,589 1,612 (23) Over -1.4% 
Financing Charges 20 20 0 0 3 (3) Over n/a 
Total Controllable Exp. 38,395 38,395 0 15,462 15,675 (213) Over   -1.4% 
Total Controllable Inc. (1,180) (1,180) 0 (590) (663) 73 Over
recovered       -12.4% 4, b,
c
Net Controllable Exp. 37,215 37,215 0 14,872 15,012 (140) Over -0.9% 
Variance Explanations 
1.     Employee costs        
This is an underspend due to vacancies which are being actively recruited.   
2.     Payment to Other Bodies
This overspend is a result of the increased requirement for support with adoption allowances and fostering placements. 
3.     Payment to Contractors 
This overspend is a result of the continuing increased requirement for children’s residential school and external placements. 
4.     Income
The over recovery of income mainly relates to an over recovery in funding due to an increase in the number of unaccompanied asylum-seeking young
people being supported. 
Budget Virements 
a. Realignment of Employee Costs Net Effect: £0, Employee Costs (£0.300m), Payment to Contractors £0.300m. 
b.    Realignment of Mental Health and Wellbeing Fund Net Effect: £0, Employee Costs £0.002m, Payment to Other Bodies (£0.550m), Income £0.548m. 
c.    Realignment of Attainment Fund Net Effect: £0, Supplies and Services (£0.013m), Payment to Other Bodies (£0.311m), Administration (£0.013m),
Income £0.337m. 
d.    Realignment of Throughcare budget Net Effect: £0, Payment to Other Bodies (£0.116m), Payment to Contractors £0.116m. 
15

Page 16

Appendix C   
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Social Work Resources Committee: Period Ended 11 August 2023 (No.5) 
Adults and Older People Services 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
11/08/23
Actual 
11/08/23
Variance 
11/08/23 
%
Variance
11/08/23
Note 
£000 £000 £000 £000 £000 £000   
Budget Category         
Employee Costs 78,104 78,104 0 25,772 28,016 (2,244) Over -8.7% 1, a, 
Property Costs 3,266 3,266 0 837 829 8 Under 1.0% d
Supplies & Services 4,763 4,763 0 1,696 1,683 13 Under 0.8% d
Transport & Plant 3,700 3,700 0 481 482 (1) Over -0.2% 
Administration Costs 756 756 0 74 85 (11) Over -14.9% 
Payments to Other Bodies 14,242 14,242 0 5,429 4,932 497 Under 9.2% 2, c
Payments to Contractors 130,450 130,450 0 44,048 42,424 1,624 Under 3.7% 3, b, c
Transfer Payments 7 7 0 2 9 (7) Over -350.0% 
Financing Charges 55 55 0 7 7 0 - 0.0% 
Total Controllable Exp. 235,343 235,343 0 78,346 78,467 (121)      Over -0.2% 
Total Controllable Inc. (65,285) (65,285) 0 (9,225) (9,346) 121 Over
recovered -1.3% 4, a, b,
d
Net Controllable Exp. 170,058 170,058 0 69,121        69,121 0 0 0.0% 
Variance Explanations 
1.  Employee costs
This overspend is mainly attributable to the home care job evaluation costs for the period 1 April to 4 August 2023, and is offset by Payments to Other
Bodies and Payments to Contractors below. 
2.  Payments to Other Bodies 
The underspend is due to unallocated funding to date. 
3.  Payments to Contractors
The underspend is due to higher than anticipated DWP offset funding in relation to residential and nursing care services and less than anticipated nursing
care home placements to date. 
4.  Income     
The over recovery is due to non-recurring recovery of funding from service users in respect of Direct Payments not being fully utilised. 
Budget Virements 
a. Drawdown from Reserves Net Effect: £0, Employee Costs (£0.681m), Income £0.681m. 
b. Community Alert Alarn reversal of increase in price Net Effect: £0, Payment to Contractors (£0.550m), Income £0.550m. 
c. Realignment of Procurement savings Net Effect: £0, Payment to Other Bodies £0.259m, Payment to Contractors (£0.259m). 
d. Realignment of increase in Residential care income Net Effect: £0, Property £0.052m, Supplies and Services £0.077m, Income (£0.129m). 
16

Page 17

Appendix D 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Social Work Resources Committee: Period Ended 11 August 2023 (No.5) 
Performance and Support Services 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
19/05/23
Actual 
19/05/23
Variance 
19/05/23 
%
Variance
19/05/23
Note 
£000 £000 £000 £000 £000 £000   
Budget Category         
Employee Costs 5,051 5,051 0 1,759 1,656 103 Under 5.9% 1
Property Costs 568 568 0 169 171 (2) Over -1.2% 
Supplies & Services 454 454 0 13 16 (3) Over -23.1% 
Transport & Plant 251 251 0 8 5 3 Under 37.5% 
Administration Costs 324 324 0 53 47 6 Under 11.3% 
Payments to Other Bodies 26 26 0 2 16 (14) Over -700.0% 
Payments to Contractors 0 0 0 0 0 0 - n/a 
Transfer Payments 0 0 0 0 0 0 - n/a 
Financing Charges 319 319 0 8 8 0 - 0.0% 
Total Controllable Exp. 6,993 6,993 0 2,012 1,919 93 Under 4.6% 
Total Controllable Inc. (635) (635) 0 (44) (40) (4) Under
recovered 9.1% 
Net Controllable Exp. 6,358 6,358 0 1,968 1,879 89 under 4.5% 
Variance Explanations 
1. Employee costs
This is an underspend due to vacancies which are being actively recruited, mainly within Admin and Clerical staff. 
17

Page 18

Appendix E 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Social Work Resources Committee: Period Ended 11 August 2023 (No.5) 
Justice Services 
Annual
Budget 
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
11/08/23
Actual 
11/08/23
Variance 
11/08/23 
%
Variance
11/08/23
Note 
£000 £000 £000 £000 £000 £000   
Budget Category         
Employee Costs 6,765 6,765 0 2,256 2,189 67 Under 3.0% 1, a
Property Costs 78 78 0 42 41 1 Under 2.4% 
Supplies & Services 77 77 0 19 35 (16) Over -84.2% a
Transport & Plant 108 108 0 57 60 (3) Over -5.3% 
Administration Costs 568 568 0 34 29 5 Under 14.7% a
Payments to Other Bodies 522 522 0 240 243 (3) Over -1.3% a
Payments to Contractors 39 39 0 39 39 0 - 0.0% a
Transfer Payments 6 6 0 2 3 (1) Over -50.0% 
Financing Charges 9 9 0 0 1 (1) Over n/a 
Total Controllable Exp. 8,172 8,172 0 2,689 2,640 49 Under 1.8% 
Total Controllable Inc. (7,084) (7,084) 0 (1,609) (1,611) 2      Over
recovered -0.1% a
Net Controllable Exp. 1,088 1,088 0 1,080 1,029 51 under 4.7% 
Variance Explanations 
1. Employee Costs
This is an underspend due to vacancies which are being actively recruited.   
Budget Virements 
a. Reduction in Big Lottery funding Net Effect: £0, Employee Costs (£0.008m), Supplies and Services (£0.022m), Administration (£0.079m), Payment to
Other Bodies £0.003m, Payment to Contractors (£0.031m), Income £0.137m. 
18

Page 19

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 27 September 2023
Report by: Executive Director (Finance and Corporate Resources)
Director, Health and Social Care  
Subject: Social Work Resources - Capital Budget Monitoring
2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 provide information on the progress of the capital programme for Social Work
Resources for the period 1 April 2023 to 11 August 2023 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): 
(1) that the Social Work Resources’ capital programme of £2.030 million, and
expenditure to date of £0.810 million, be noted. 
3. Background
3.1. This is the second capital monitoring report presented to the Social Work Resources
Committee for the financial year 2023/2024.  Further reports will follow throughout
the year. 
3.2. The budget of £2.030 million for Social Work Resources is based on the overall
Capital Programme for 2023/2024, which was approved by the Executive Committee
on 21 June 2023.  There has been no change to this budget since the last report to
this Committee (28 June 2023). 
3.3. The report details the financial position for Social Work Resources in Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2023/2024 Capital Programme Update 
As detailed in Section 3.2, the 2023/2024 capital programme for Social Work
Resources is £2.030 million.   
5.2. Period 5 Position   
Anticipated spend to date was £0.811 million and spend to 11 August 2023 amounts
to £0.810 million, a minor underspend of £0.001 million.  
4
19

Page 20

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Professor Soumen Sengupta
Director, Health and Social Care 
7 September 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 21 June 2023 
List of Background Papers
▪ Financial ledger to 11 August 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
20

Page 21

Appendix A 
South Lanarkshire Council
Capital Expenditure 2023-2024
Social Work Resources Programme
For Period 1 April 2023 – 11 August 2023 
Social Work Resources Base
Budget 
£000
Budget
Adjustments
£000
Slippage
£000
Total
Budget
£000 
Budget 
to Date
£000
Actual
Expenditure
£000 
Community Alarms -
Analogue to Digital 1,232 - - 1,232  423 422 
Swis Plus Replacement 798 - - 798  388 388 
TOTAL 2,030 - - 2,030  811 810 
21

Page 22

22

Page 23

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 27 September 2023
Report by: Executive Director (Finance and Corporate Resources)
and Director, Health and Social Care  
Subject: Social Work Resources – Workforce Monitoring – May
to July 2023 
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 provide employment information for May to July 2023 relating to Social Work
Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for May to July 2023 relating to
Social Work Resources be noted: - 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as of 10 June 2023 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee. This report for Social Work
Resources provides information on the position for May to July 2023. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of July 2023 for Social
Work Resources. 
The Resource absence figure for July 2023 was 6.5%, this figure remains
unchanged when compared to last month and is 2.7% higher than the Council-wide
figure. Compared to July 2022, the Resource absence figure has decreased by
1.4%. 
Based on the absence figures at July 2023 and annual trends, the projected annual
average absence for the Resource for 2023/2024 is 7.3%, compared to a Council-
wide average figure of 5.5%.
5
23

Page 24

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence.
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall, 310 referrals were made this period. This represents a
decrease of 35 when compared with the same period last year. 
4.3. Accident/Incident Statistics 
There were 29 accidents/incidents recorded within the Resource this period, a
decrease of 8 when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 6 disciplinary hearings were held within the Resource, an increase
of 1 when compared to the same period last year. No appeals were heard by the
Appeals Panel. No grievance hearings were raised within the Resource, this figure
remains unchanged when compared to the same period last year. No Dignity at
Work complaints were raised within the Resource, this figure remains unchanged
when compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2) 
There were a total of 40 leavers in the Resource this period eligible for an exit
interview. This figure has increased by 3 when compared with the same period last
year. Fourteen exit interviews were conducted in this period, a decrease of 6 when
compared to the same period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council. If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term post 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings. In the period May to July 2023, 79 employees (60.87
FTE) in total left employment, managers indicated that 68 posts (52.00 FTE) were
being replaced, 1 post (0.00 FTE) is being filled on a fixed term basis, 1 post (0.95)
plan to transfer this budget to another post, 2 posts (2.00 FTE) were due to the end
of a fixed term contract and 7 posts (5.92 FTE) are being held pending a savings or
service review. 
5. Staffing Watch 
5.1. There has been an increase of 43 in the number of employees in post from 11 March
2023 to 10 June 2023.
24

Page 25

6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in terms 
of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
Professor Soumen Sengupta
Director, Health and Social Care 
24 August 2023 
Link(s) to Council Values/Priorities/Outcomes
       Accountable, effective, efficient and transparent
       Fair, open and sustainable
       Ambitious, self aware and improving
       Excellent employer
       Focused on people and their needs
       Working with and respecting others 
Previous References
 Finance and Corporate Resources – 28 June 2023 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Eileen McPake, HR Business Manager
Ext: (Tel: 01698 454647)
E-mail:  Eileen.McPake@southlanarkshire.gov.uk 
25

Page 26

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 4.5 6.2 6.5 April 9.6 12.6 9.4 April 6.2 8.3 7.4 April 4.3 5.6 5.1
May 5.0 5.7 5.8 May 9.3 10.1 8.4 May 6.5 7.1 6.6 May 4.9 5.4 5.1
June 3.9 5.9 5.5 June 7.6 11.3 8.6 June 5.2 7.6 6.5 June 4.7 5.3 4.7
July 6.1 6.0 5.4 July 10.3 11.8 8.8 July 7.5 7.9 6.5 July 4.0 4.6 3.8
August 7.3 6.0 August 10.2 10.8 August 8.2 7.5 August 4.7 4.4
September 7.6 5.9 September 10.3 9.6 September 8.5 7.1 September 6.4 5.4
October 6.9 5.8 October 11.3 10.4 October 8.4 7.3 October 6.3 5.8
November 6.2 6.0 November 10.8 10.4 November 7.7 7.4 November 6.9 6.5
December 5.5 6.4 December 11.1 10.6 December 7.3 7.7 December 6.9 7.0
January 7.4 5.2 January 13.0 12.0 January 9.2 7.4 January 7.0 5.8
February 7.5 5.8 February 10.1 11.0 February 8.3 7.5 February 6.6 5.9
March 8.0 7.0 March 12.8 10.9 March 9.5 8.2 March 7.9 6.4
Annual Average 6.3 6.0 5.9 Annual Average 10.5 11.0 10.1 Annual Average 7.7 7.6 7.3 Annual Average 5.9 5.7 5.5
Average Apr-Jul 4.9 6.0 5.8 Average Apr-Jul 9.2 11.5 8.8 Average Apr-Jul 6.4 7.7 6.8 Average Apr-Jul 4.5 5.2 4.7
1873 1054 2927 16165No of Employees at 31 July 2023 No of Employees at 31 July 2023 No of Employees at 31 July 2023 No of Employees at 31 July 2023
Appendix 1
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
Social Work Resources
APT&C Council WideResource TotalManual Workers
26

Page 27

May - Jul May - Jul
2022 2023
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 94 96
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 1
TOTAL 345 310
May - Jul May - Jul
2022 2023
Specified Injuries* 2 1
Over 7 day absences 3 3
Over 3 day absences** 0 1
Minor 17 16
Near Miss 2 1
Violent Incident:  Physical**** 7 4
Violent Incident:  Verbal***** 6 3
Total Accidents/Incidents 37 29
May - Jul May - Jul
2022 2023
Total Number of Hearings 5 6
Time Taken to Convene Hearing May - July 2023
0-3 Weeks 4-6 Weeks Over 6 Weeks
4 2 0
May - Jul May - Jul
2022 2023
Number of Grievances 0 0
May - Jul May - Jul
2022 2023
Number of Incidents 0 0
May - Jul May - Jul
2022 2023
Career Advancement 6 6
Child Caring / Caring Responsibilities 0 1
Disatisfaction with terms and conditions 2 0
Further Education 4 1
Personal Reasons 1 1
Poor relationship with managers / colleagues 0 1
Travelling difficulties 2 3
Other 5 1
Number of Exit Interviews conducted 20 14
Total Number of Leavers Eligible for Exit Interview 37 40
Percentage of interviews conducted 54% 35%
Appendix 2
97 85
32 27
SOCIAL WORK RESOURCES
122 101
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight, serious
burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a chemical or hot
metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a period
of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not lead to
injury of persons, damage to property, plant or equipment but may have done so in different circumstance.
ANALYSIS OF REASONS FOR LEAVING
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the "Total
Specified" figures.
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-day"
figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
27

Page 28

FTE H/C FTE H/C
Terminations/Leavers 60.87 79 84.49 110
Being replaced 52.00 68 74.52 96
Filling on a temporary basis 0.00 1 0.81 3
Plan to transfer this budget to another post 0.95 1 0.95 1
End of fixed term contract 2.00 2 2.29 3
Held pending service Review 5.92 7 5.92 7
Plan to remove for savings 0.00 0 0.00 0
May - July 2023
Appendix 2a
Reason Cumulative total
28

Page 29

As at 10 June 2023
Total Number of Employees
F/T P/T F/T P/T
206 198 979 1326
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
3.00 361.42 1417.31 523.46 33.80 31.76 0.00 0.00 0.00 2370.75
As at 11 March 2023
Total Number of Employees
F/T P/T F/T P/T
204 186 948 1328
Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
1.00 1105.28 633.47 523.69 36.80 29.76 2.00 0.00 0.00 2332
Appendix 3
JOINT STAFFING WATCH RETURN
SOCIAL WORK RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
2709
MALE FEMALE TOTAL
Salary Bands
MALE FEMALE TOTAL
2666
*Full - Time Equivalent No of Employees
29

Page 30

30

Page 31

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 27 September 2023
Report by: Director, Health and Social Care 
Subject: Update on the 2022/23 Risk Register and Risk Control Plan 
1. Purpose of Report
1.1. The purpose of the report is to:-[purpose]
 Provide an update on risk management arrangements and the Risk Register for
Social Work Resources
[1purpose]
2. Recommendation(s)
2.1. The Social Work Resources Committee is asked to approve the following
recommendation(s):-
[
(1) that the contents of the report be noted;
(2) that the set of top risks for Social Work Resources be approved; and
(3) that an additional two Social Work risks be approved. 
3. Background
3.1. The Council’s Risk Management Strategy promotes consideration of risk in service
delivery, planning and decision-making processes. The Strategy requires Resources
to record and review risks and control actions regularly.  Social Work Resources
follow the guidance in developing, monitoring and updating the Risk Register on an
ongoing basis. 
3.2. The purpose of the Risk Register is to ensure that Social Work Resources is fully
aware of its top risks; that these risks are prioritised; and that controls are in place to
eliminate or minimise the impact of the risks. 
3.3. The Resource scores these risks in accordance with the Council’s corporately
agreed scoring mechanism, based on likelihood and impact.  This results in risks
being scored between one and twenty-five (low – very high).  Risks are scored on
their inherent score (risk if we do nothing) and their residual risk (risk after applying
controls).  Further detail on the Council’s scoring matrix and approach to risk
appetite is outlined in appendix one. 
3.4. Each Resource has a Resource Risk Management Group which has responsibility
for the promotion and management of risk.  The Social Work Resources Risk
Management Group continues to meet on a regular basis to provide operational
oversight of all risks impacting on the delivery of social care services. 
3.5. This particular report provides an update to Social Work Resources Committee on a
number of interrelated pieces of work that have been undertaken with regards to risk
in the context and how these impact on the delivery of social care services.  Notably,
this report will cover the following areas:  
6
31

Page 32

• A reviewed list of top risks impacting on social care as per agreement at Social
Work Resources Committee on 28 June 2023
• A review of the Council’s top risks for 2023/24 
4. Review of the Top Risks Impacting on Social Care Services
4.1. At its meeting of 28 June 2023, Social Work Resources Committee agreed the top
five risks impacting on the delivery of social care services.   It is evident that these
risks continue to have a significant impact and therefore remain valid as the agreed
top risks. 
Table 1 – Social Work Resources Top Risks 
Top Risk Risk Level
1. Funding and Budgetary Pressures Very high
2. Workforce availability and capacity  Very high
3. Public Protection and Legislative Duties Very high
4. Market and Provider Capacity  Very high
5. Winter demands and pressures Very high 
4.2. It is further proposed that two new risks are added to the register. These include: 
o Failure to comply with or meet the expected standards, scrutiny levels, or
improvement as identified by regulatory bodies 
The Care Inspectorate is the independent scrutiny body that supports
improvement in social care and social work.  It registers care services in
Scotland and inspects them to ensure that the quality of care meets the health
and social care standards.  It also has the authority to issue improvement
notices and can seek authorisation through the courts to close a registered
service that has failed to comply with or meet expected standards, scrutiny levels,
or self-evaluated criteria. 
The consequence of service closures or variations to service is an intensive
response by the council and its partners, ensuring the immediate safety and
wellbeing of people in receipt of support.  Meanwhile, other high risks for social
work are compounded such as failure to meet statutory and legislative duties in
respect of public protection; the ability to fully deliver the strategic outcomes
required of the Integration Joint Board; an impact on market and provider
capacity; and additional pressure on funding and budgetary gaps. 
o Implications of the Scottish Fire and Rescue Service Unwanted Fire Alarm
Signals Policy within the council's non-domestic estate
The Scottish Fire and Rescue Service (SFRS) will no longer respond to
automatic fire alarm call outs to commercial business and non-residential
workplaces from a single smoke detector unless the presence of a fire has
been confirmed through investigation by workplace employees on site.  The
changes implemented on 1 July 2023 are in response to the high number of
unnecessary callouts to single smoke alarms.  All other automatic alarms will
continue to be responded to as normal by SFRS. 
4.3. A number of factors continue to impact directly on the top risks relating to funding
and budgetary pressures and market/provider capacity. Although these do not alter
the risk scoring of the others at this stage, they do emphasise further challenges
which require to be accounted for in a risk context.    
32

Page 33

Of note and for information, these additional challenges are related to: 
• unanticipated costs related to the outcome of the South Lanarkshire Council care
at home job evaluation process
• ongoing budgetary pressures within the children’s element of the Children and
Justice budget
• financial pressures affecting the stability of the external provider market 
4.4. Appendix 2 provides further detail on each of the top risks, alongside the inherent
and residual risk scores and sample controls. 
4.5. Whilst these top risks are the primary focus of the Resource in terms of oversight,
monitoring and management, there remain 13 other risks rated as high but deemed
to be of lesser impact at this point in time.  The Resource continues to monitor these
risks and contribute to by way of mitigation, some of which are wider organisational
risks that require all departments of the council to respond to by working together
corporately.  The list below provides some additional detail in this regard: 
1. Deliver Strategic Commissioning Plan Outcomes required by IJB
2. Achieve standards and scrutiny levels identified by regulatory bodies (New)
3. Cost of living crisis
4. Implications of the SFRS Unwanted Fire Alarm Signals Policy (New)
5. Business continuity, response and recovery
6. IT developments and functionality
7. Fraud, theft organised crime and cyber attacks
8. National Care Service
9. Sustainable development and climate change objectives
10. Historic Child Abuse 
11. Refugee resettlement and asylum seeker dispersal programme
12. Disruption to council services due to industrial action 
4.6. From a risk appetite and tolerance perspective, the Council aims to be risk embracing,
in that it will accept a tolerable level of risk in seeking service efficiencies and in
agreeing control measures. The level of risk facing the Council is measured both
before (inherent risk) and after (residual risk) consideration of controls.  The Council
should never carry a very high residual risk exposure as this would indicate instability,
but a low residual risk exposure should also be avoided as this indicates lack of
innovation.   
4.7. The Council’s universal risk tolerance levels are outlined within the Council’s Risk
Management Strategy 2020, and this is expected to be reviewed over the next year. 
The current ideal risk profile is defined as:
 No more than 10 per cent of residual risks at a very high level
 No more than 15 per cent of risks at a high level
 Around 50 to 60 per cent of residual risks at a medium level
 No more than 30 per cent of residual risks at a low level 
4.8. The Social Work Resources risk profile is detailed in Table 2, in respect of the 18 risks
referred to in sections 4.1 and 4.3.  The profile currently exceeds the ideal universal
risk exposure levels defined by the Risk Management Strategy detailed above;
however, it is reflective of the environment which the service currently operates within
and mirrors the highest level risks currently facing the Council.    
33

Page 34

Table 2 - Top risks risk profile
Risk
category
Risk
rating
Number
of risks
Percentage
of risks
1 Very high 10 56%
2 High 8 44%
3 Medium 0 -
4 Low 0 - 
4.9. Risk will remain a standing item on Social Work Resources Committee and the Risk
Register and reporting of risk will be a dynamic process, with Committee receiving
updates on any changes to levels of risk or new risks which may evolve over time. 
5. Reviewing the Council’s Top Risks for 2023/24
5.1. An annual review of the Council’s top risks began in April 2023 with views sought
from Heads of Service, Senior Managers, Elected Members and Trade Unions. 
5.2. The review will support the systematic identification and assessment of top risks and
cross cutting themes across the council which will be monitored through individual
resource risk registers. 
5.3. Details of the finalised top risks in ranking order will be presented to the Risk and
Audit Scrutiny Committee on 31 October 2023, with presentation following at Social
Work Resources Committee on 6 December 2023.   
6. Three lines model 
6.1. The Council has introduced the ‘three lines of defence model,’ developed by the
Institute of Internal Auditors, to provide greater assurance of the adequacy of control
measures in place for strategic risks. 
6.2. The intention of the model is to ensure that top risks are mitigated through ‘three
lines of defence’, which are: 
Line 1  Control by operational management
Line 2 Control and compliance by functions that have an oversight role (for
example Risk Management)
Line 3  Independent assurance 
6.3. The development of this model has been underway across each resource throughout
2022/23 and will continue during 2023/24. 
7.  Major projects, partnerships, or change
7.1. Within Social Work Resources, 13 partnerships have been identified. Highlighted
risks for partners include the current unprecedented financial challenges and
workforce pressures faced by health and social care. 
7.2. The South Lanarkshire Integration Joint Board (IJB) has an approved risk
management strategy and a risk register in place which details the organisation’s
approach to risk and how it will identify and manage risks to mitigate against
subsequent impact. 
34

Page 35

The IJB has identified 8 risks including:
• 4 very high/high risks – demand pressures; workforce availability; financial
sustainability; external provider resilience
• 4 medium/lower risks – public protection; public sector duties; transformation;
National Care Service 
7.3. IJB members are currently engaged in discussions with partners regarding
transformational change across health and social care to address budgetary
pressures and recurrent funding gaps whilst continuing to protect staff and support
those most vulnerable within our communities. 
8. National Risk Register 
8.1.  The latest version of the National Risk Register was published on 3 August 2023,
identifying the most serious risks facing the United Kingdom and assisting
responders, businesses and members of the public to plan, prepare and respond to
risk. It focuses on 9 risk themes, these are: 
• Terrorism
• Cyber
• State threats
• Geographic and diplomatic
• Accidents and systems failures
• Natural and environmental hazards
• Human, animal and plant health
• Societal
• Conflict and instability 
8.2.  In terms of social care, the document highlights the risks faced by local authorities in
relation to cyber-attacks, severe weather, and complex major provider failure, which
has the potential to impact on market capacity across multiple local authority areas
and directly affect individuals with care and support needs. The full document can be
accessed at: National Risk Register - 2023 
9. Next steps
9.1. The Resource Risk Management Group will continue to meet on a regular basis. The
Risk Register will be reviewed on an ongoing basis by the group to ensure that risks
remain valid for the appropriate service areas and to identify new areas of risk that
affect the Resource.  An update report will be provided regularly to Committee. 
9.2. Moreover, future reports and proposals brought before Social Work Resources
Committee will show the correlation and read across with the top risks to assure
Committee that such proposals are geared towards providing further levels of
mitigation. 
9.3. A further report on the outcome of the review of the Council’s top risks will be
provided at the next meeting. 
10. Employee Implications
10.1. Time will be required for the Resource Risk Management Group to manage the
Resource Risk Register and Risk Control Plan. 
35

Page 36

11. Financial Implications
11.1. There are no direct financial implications associated with the Resource’s top risks. 
There are a number of proposed risks which are classified under the heading of
financial.  Where this is the case, the appropriate controls and actions have been
included in the risk control cards and progress will be monitored. 
12. Climate Change, Sustainability and Environmental Implications 
12.1. Sustainable development issues are included within the Council’s top risk register
through being linked directly to the Council Plan objective ‘make communities safer,
stronger and sustainable’ 
13. Other Implications
13.1. Failure to demonstrate that risk is actively considered and managed cannot only lead
to avoidable financial loss but could also affect delivery of services and the
reputation of the resource. 
14. Equality Impact Assessment and Consultation Arrangements
14.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore, no impact assessment
is required. 
14.2. Consultation on the content of this report has been undertaken with the Resource
Management Team. 
Professor Soumen Sengupta
Director, Health and Social Care 
22 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
• Social Work Resources Committee –  28 June 2023 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Ciana Stewart, Planning and Performance Manager
Ciana.stewart@southlanarkshire.gov.uk 
36

Page 37

Appendix One – Risk scoring matrix, likelihood and impact definitions 
Likelihood 
Score 1 2 3 4 5
Description Rare   Unlikely  Possible  Likely Almost
certain 
Likelihood of
occurrence
1 in 10 years 1 in 3 years 1 in 2 years Annually Monthly
Probability of
occurrence
The event may
occur in certain
circumstances
The event
could occur
The event may
occur
The event will
probably occur
The event is
expected to
occur or
occurs
regularly 
Impact 
Reputation Financial Service delivery/
Time to recover
Compliance Safety
1
Negligible
Public concern
restricted to
local
complaints
<£50,000 per
annum
No impact to
service quality;
limited disruption
to operations.
No external
interest
Minor injury
– no lost
time
2
Minor
Minor adverse
local/public/me
dia attention
and complaints
£50,000-
£250,000 per
annum
Minor impact to
service quality;
minor service
standards are not
met; short term 
Very minor
attention
from
legislative
/regulatory
body
Minor injury
– resulting
in lost time
3
Moderate
Adverse
national media
Public attention
£250,000 to
£500,000 per
annum
Significant fall in
service quality;
major partnership
relationships
strained; serious
disruption in
service standards
Short-term
attention
from
legislative/
regulatory
body 
Major injury
or ill health
resulting in
lost time
4
Major
Serious
negative
national or
regional
criticism
£500,000 to
£1million per
annum
Major impact to
service delivery;
multiple service
standards are not
met; long term
disruption to
operations;
multiple
partnerships
affected
Medium-term
attention
from
legislative/
regulatory
body 
Fatality;
Or injuries
to several
people
5
Catastrophic
Prolonged
international,
regional and
national
condemnation
>£1million per
annum
Catastrophic fail
in service quality
and key service
standards are not
met; long term
catastrophic
interruption to
operations;
several major
partnerships are
affected
National
impact with
rapid
intervention
of legislative/
regulatory
body 
Multiple
fatalities; Or
injuries to
large
number of
people 
The assessments for impact and likelihood combine to provide an overall inherent risk score on the
scale of between 1 and 25, using the council’s recognised risk matrix. 
37

Page 38

Risk matrix       
Likelihood
5
Almost
Certain
5 10 15 20 25
4
Likely 4 8 12 16 20
3
Possible 3 6 9 12 15
2
Unlikely 2 4 6 8 10
1
Rare 1 2 3 4 5  
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
The risk score is calculated as follows: 
Likelihood score x Impact score = Risk Score 
Risks scored 15 to 25 are considered to be very high risks and risks scored 8 to 12 are
considered to be high risks.  Very high and high risks are monitored closely. 
38

Page 39

Appendix Two 
Social Work Resources Risk Register (August 2023)
Extract of risks with residual score category of Very High 
Sample of Controls 
Risk
Category
Key Risk Inherent
risk
score
1st line of defence:
Operational
management
2nd line of defence:
Corporate functions
(not internal audit)
that oversee or who
specialise in
compliance or the
management of risk
(CMT)
3rd line of defence
independent
assurance
(internal/external
audit and any other
scrutiny or
regulatory body)
Residual Risk
Score
1 1
Very High
(15-25) 
Funding and Budgetary Pressures
Description
• Risk that services have to re-prioritised as
a result of reductions in budgets
• Reduction in early intervention and
prevention activity as a result of having to
respond to statutory duties such a public
protection 
25 Budget holder
responsibility and
monitoring. 
Care Packages
linked to finance
module 
Voluntary Sector
commissioned
services can lever
additional funding
to the area
Revenue and
Capital budget
monitoring reports
to SW Committee 
Four weekly
monitoring and
reporting of financial
performance to
CMT 
COSLA role in
support of LA’s and
links to Scottish
Government 
Audit Scotland
reports and briefings 
20
39

Page 40

2 1
Very High
(15-25)
Workforce Availability and Capacity   
Description
• Lack of capacity and skills to meet increased
service demands.
• National shortage of skilled workforce across
all sectors
• Recruitment, selection, and retention of Social
Care Staff challenging
• Growing demographic and post pandemic
service demands
• Workforce profile shows an ageing workforce
within social care
• Competition with other industry sectors and
Local Authorities 
25 Prioritising of
workloads and
escalation
processes within
the management
team 
Social Care and
Social Work Critical
Functions
Framework 
Care at Home
social media
recruitment
campaign
(Everyday heroes)
Workforce
Monitoring reports
to SWC 
Personnel targeted
recruitment
campaigns 
Increase use of
social media to
recruit 
Care Academy
Workforce Strategy
for Health and
Social Care
Scotland 
SSSC (Scottish
Social Services
Council) registration
requirements
20  
40

Page 41

3 1
Very High
(15-25)
Meeting Public Protection and Legislative
Duties 
Description
• Ability to meet increased demands and risks
with regards Public Protection (Child
Protection, Adult Support and Protection,
MAPPA and Gender Based Violence)
• Meeting all legislative duties pertaining to
assessment, support planning and reviews 
25 System of
prioritisation agreed
and operational
across areas such
as child protection 
Readily available
operational and
strategic
management
information
regarding
compliance with
timescales/targets
for Public
Protection 
ASP decision
making support tool
for staff. 
Wellbeing portal for
all staff to access.
Risk Assessment
for Service Users
PPE support to all
who require 
A risk assessment is
part of care
management
function. 
Mandatory training
and LOL courses for
all staff, specific
legislation LOL’s
available. 
Workforce updates
to all SW Committee
Meetings.
Serious Incident
recording and action
Previous inspections
reports by CI: SDS,
Children’s Services
and ASP inspection. 
All registered care
services have
oversight by Care
Inspectorate 
Other inspection:
Mental Welfare
Commission reviews 
20
41

Page 42

4 1
Very High
(15-25)
Market and Provider Capacity 
Description
• Capacity within the market of social care
providers to meet rising demand and
complexity
• Supply chain challenges within the social
care market, for example workforce
availability impacting on available
capacity
• Social care providers ability to maintain
compliance with national standards and
quality of service delivery
• Annual contractual discussions with
regards to agreeing rates for social care
providers 
25 Quality Assurance
& Commissioning
Team in place 
Fieldwork teams
aligned to local
providers as point
of contact 
Procurement
Network Oversight
meetings in place 
Mapping tool
developed in
support of care at
home service 
Oversight of all
social care
registered providers
operating within
South Lanarkshire 
Corporate
procurement
support to ensure
social care
providers comply
with agreed
frameworks and
contracts 
Care Inspectorate
regulation of all care
services 
Scottish Care
support of
independent,
private, voluntary
care providers. 
Social Work
Scotland Care
Market intelligence
shared. 
20  
42

Page 43

5 1
Very High
(15-25) 
Winter Demand Pressures
Description
• Increased service demand beyond normal
levels as a result of the impact of
seasonal Flu, other respiratory conditions
and increased unwellness in the
population
• Impact on workforce availability due to
potential increases in sickness/absence
• Impact of adverse weather on service
delivery 
25 Planning for Winter
2023/2024
commenced in July
2023 
All social care staff
offered flu and
COVID 19
vaccines. 
Covid and Flu
Vaccine
Programme for
public 
Care at home
mapping of all
cases
geographically to
assist with
scheduling and
prioritisation 
Maximising Planned
Date of Discharge,
Discharge Without
Delay and Home
First 
The Council has a
multi-agency
approach across
Lanarkshire with key
partners in terms of
responding winter
demand.  Key
partners include
North Lanarkshire
Council, NHS
Lanarkshire and the
two IJBs for North
and South. 
The annual Winter
Plan for Lanarkshire
outlines key actions
in responding to
increases in
demand. 
NHS Scotland,
Public Health
Scotland, Healthier
Scotland driving
forward Winter 2023
Vaccines
programme. 
Overall Resilience
Planning across
Lanarkshire and
nationally
20 
43

Page 44

44

Page 45

Report 
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 27 September 2023
Report by: Director, Health and Social Care
Executive Director (Finance and Corporate Resources)  
Subject: Strengthening Arrangements for Self-Directed Support 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose] 
 to seek approval to delete the existing post of Operations Manager and convert to
a full time Fieldwork Manager.
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the content of the report be noted; and
(2) that Committee approves the change to establishment outlined at 5.1. 
3. Background
3.1. Self-Directed Support (SDS) aims to improve the lives of people with social care
needs by empowering them to be equal partners in decisions about their care and
support. Four fundamental principles of SDS are built into the Social Care (Self-
directed Support) (Scotland) Act 2013: participation and dignity, involvement,
informed choice and collaboration. This means social care should be provided in a
way that gives people choice and control over their own lives and which respects and
promotes their human rights. 
3.2.  The Act and its recently updated Guidance (November 2022) tells local authorities 
what they must do to give access to SDS in a way that supports people's rights to 
choice, dignity and being able to take part in the life of their communities, namely: 
3.2.1. Treat supported people with dignity and respect at all times, including when they first 
assess someone for support. 
3.2.2. Offer the four SDS options and explain what each of them mean in a balanced and 
impartial way, and how they would work for the supported person's unique 
circumstances. 
3.2.3. Make sure that supported people have a say in planning what their support looks like 
and that they have as much involvement as they want in decisions about their 
support. 
3.2.4. Make sure that supported people have enough information to understand what is 
available and to make the choices which are right for them. This should include 
information about where to find independent support to help them choose. 
7
45

Page 46

3.2.5. Make sure that supported people have opportunities to challenge and ask questions 
about any aspect of their support and are given enough time to understand and 
participate in decisions about their support, particularly when it is being stopped or 
changed. 
3.3.  There are four main options or ways of directing support. When making these 
choices, a supported person can choose to have lots of direct control over their care 
and support, or choose to leave most of the decisions and work to the local authority, 
or choose a mix of these: 
3.3.1.  Option 1 – the supported person receives a direct payment. The local authority will 
decide how much money they will give to the supported person towards their 
support. The supported person receives this money and uses it to arrange their own 
support, which can include employing staff and/or buying goods and services. The 
supported person has full choice and control and also has the most responsibility for 
arranging support, which may include employer responsibilities. 
3.3.2.  Option 2 – the supported person decides on the support they want, and support is 
arranged on their behalf. The local authority will decide how much money they will 
give to the supported person towards their support. The supported person can use 
the money to choose goods and services, for example from a registered support 
provider, and then the support is arranged on their behalf. This can be arranged by 
the local authority or a third party (such as a support provider) managing the money 
on behalf of the supported person. This way, the supported person has full choice 
and control over how their support is arranged but does not have to manage the 
money. 
3.3.3.  Option 3 – after discussion with the supported person, the local authority decides 
and arranges support. The local authority will decide how much money can be spent. 
The supported person asks the local authority to choose and arrange the support 
that it thinks is right for them. With this choice the supported person is not 
responsible for arranging support and has less direct choice and control over how 
support is arranged. 
3.3.4.  Option 4 – the supported person uses a mixture of ways to arrange their care and 
support. Some people will want to have direct control of how some parts of their 
support is arranged but not other parts. Option 4 lets the supported person pick the 
parts they want to have direct control over and what parts they want to leave to the 
local authority. 
3.5.  The diagram overleaf illustrates the key stages in a person's pathway to 
accessing SDS. The assessment of eligible needs and the identification of resources 
are all part of the same process, which starts with the good conversation and ends in 
a budgeted support plan and the offer of the four SDS options. 
46

Page 47

3.6.  SDS is one of the areas captured within the national Local Government 
Benchmarking Framework (LGBF) published by the Improvement Service, 
specifically: 
Self-Directed Support (Direct payments and managed personalised budgets) spend
on adults 18+ as a percentage of total social work spend on adults 18+ 
3.7.  Since 2010-11, the proportion of total social work spend in South Lanarkshire
allocated via option 1 and option 2 has grown steadily from 1.77% to 3.98%. It was 
recognised that many of our care at home recipients did not go through the same 
SDS process and did not exercise choice.  
3.8.  As reported in the 2022 LGBF results, South Lanarkshire Council was “ranked” 24 in 
Scotland in respect of the indicator above; and that the benchmark set within the 
LGBF is for 8.16% total social work spend to be allocated to options 1 and 2. 
3.9.  Several key developments have been introduced to strengthen our approach to SDS 
in South Lanarkshire, including introduction of the revised Living the Life You 
Choose assessment; and commencing a review of SDS public information provision. 
3.10. Previous reports to Committee established a review team concentrating on SDS
activity and also supporting locality teams to target the substantial level of reviews
that were necessary to comply with the Council’s statutory duties. 
3.11. Committee has also previously approved changes to the establishment of the
Community Addiction and Recovery Service (CAReS) which resulted in a post of
Operations Manager being transferred to the SDS Team. 
3.12. The current team structure includes a 0.5 wte Fieldwork Manager post and a full time
Operations Manager. A revision to the structure would provide for greater
consistency and equity in roles and responsibilities.
47

Page 48

4. Proposals
4.1. The proposal is to delete the post of Operations Manager and convert to a full-time
Fieldwork Manager. 
4.2. This proposal will ensure that the structure is consistent with other fieldwork services
in localities and provide a net saving overall. 
5. Employee Implications
5.1. The proposed changes will result in a net reduction of 0.5 wte with a recurring saving
overall.  
Post Current  Proposed Grade SCP
Range
Hourly
Rate
Annual
Salary
Gross
Cost inc
on costs
31.55%
Total
Costs 
Fieldwork
Manager
0.5  1  G5 L1 96-97
£31.25
-
£31.73
£57,028
-
£57,904
£74,308
-
£75,449
£39,277
-
£39,880
Operations
Manager 1  0 G4 L2 82-83
£25.37
-
£25.77
£46,298
-
£47,028
£60,326
-
£61,277 
(£60,326
-
£61,277)
Total 1.5  1     
(£21,049
-
£21,397 
6. Financial Implications
6.1. The cost of the staffing proposals can be met within existing allocations and will
deliver a net saving overall. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for Climate Change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. The proposals contained in this report will contribute to the mitigation of a number of
risks within the Social Work Resources Risk Register, notably: 
 lack of capacity and skills to provide and meet increased service demands (very
high)
 the Council fails to meet statutory and legislative duties in respect of  Self direct
Support (SDS)
 the Council does not fully deliver the strategic outcomes of the IJB as outlined in their
Strategic Commissioning Plan (very high) 
8.2. Risk mitigation of the above would be supported here by the further provision of
career progression opportunities and a more appropriate infrastructure to support
frontline staff.
48

Page 49

8.3. There are no other issues associated with this report.   
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
Professor Soumen Sengupta
Director, Health and Social Care 
Paul Manning
Executive Director (Finance and Corporate Resources) 
27 August 2023 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Ambitious, self-aware and improving
 We will work to put people first and reduce inequality 
 We will work to recover, progress and improve
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 none 
List of Background Papers
 none 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Ian Beattie, Head of Health and Social Care
Ext: 3701 (Phone: 01698 453701)
Email:  Ian.Beattie@southlanarkshire.gov.uk 
49

Page 50

50