Democracy Spraffa

Agenda Document Pack - Social Work Resources Committee - 11/06/2025

South Lanarkshire Council · 11 June 2025
Back to Social Work Resources Committee — 11 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 03 June 2025 
Dear Councillor 
Social Work Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 11 June 2025
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Margaret B Walker (Chair), Kirsty Williams (Depute Chair), Joe Fagan (ex officio), Alex Allison, John
Anderson, Walter Brogan, Robert Brown, Archie Buchanan, Mathew Buchanan, Janine Calikes,
Maureen Devlin, Colin Dewar, Mary Donnelly, Allan Falconer, Elise Frame, Celine Handibode,
Graeme Horne, Mark Horsham, Martin Hose, Eileen Logan, Hugh Macdonald, Catherine
McClymont, Carol Nugent, John Ross, Graham Scott, David Watson 
Substitutes
John Bradley, Maureen Chalmers, Margaret Cooper, Margaret Cowie, Geri Gray, Susan Kerr,
Richard Lockhart, Elaine McDougall, Mark McGeever, Davie McLachlan, Richard Nelson, Bert
Thomson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Social Work Resources Committee held on 26
March 2025 submitted for approval as a correct record.  (Copy attached) 
5 - 14 
Monitoring Item(s) 
3 Social Work Resources – Workforce Monitoring – 1 February to 31 March
2025
Joint report dated 6 May 2025 by the Executive Director (Finance and Corporate
Resources) and Director, Health and Social Care.  (Copy attached) 
15 - 22 
4 Social Work Resource Plan 2024/2025 Quarter 4 Progress Report
Report dated 1 May 2025 by the Director, Health and Social Care.  (Copy
attached) 
23 - 46 
Item(s) for Decision 
5 Social Work Resource Plan 2025/2026
Report dated 17 April 2025 by the Director, Health and Social Care.  (Copy
attached) 
47 - 68 
6 Strengthening Justice Services Capacity
Joint report dated 21 May 2025 by the Executive Director (Finance and
Corporate Resources) and Director, Health and Social Care.  (Copy attached) 
69 - 72 
7 Investing in Recovery Oriented Justice Services
Joint report dated 21 May 2025 by the Executive Director (Finance and
Corporate Resources) and Director, Health and Social Care.  (Copy attached) 
73 - 78 
Item(s) for Noting 
8 Winter Planning 2024/2025 Debrief
Report dated 19 May 2025 by the Director, Health and Social Care.  (Copy
attached) 
79 - 86 
9 Care Inspectorate Update for Registered Care Services - 1 January to 31
March 2025
Report dated 15 May 2025 by the Director, Health and Social Care.  (Copy
attached) 
87 - 104 
10  Notification of Contracts Awarded - 1 October 2024 to 31 March 2025
Report dated 8 May 2025 by the Director, Health and Social Care.  (Copy
attached) 
105 - 110 
2

Page 3

Urgent Business 
11  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385 403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

SOCIAL WORK RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 26 March 2025 
Chair: 
Councillor Margaret B Walker 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Mathew
Buchanan, Councillor Maureen Devlin, Councillor Colin Dewar, Councillor Mary Donnelly, Councillor
Allan Falconer, Councillor Elise Frame, Councillor Geri Gray (substitute for Councillor Janine
Calikes), Councillor Celine Handibode, Councillor Graeme Horne, Councillor Martin Hose,
Councillor Eileen Logan, Councillor Hugh Macdonald, Councillor Catherine McClymont, Councillor
Carol Nugent, Councillor John Ross, Councillor Graham Scott, Councillor David Watson, Councillor
Kirsty Williams (Depute) 
Councillors' Apologies:
Councillor Walter Brogan, Councillor Archie Buchanan, Councillor Janine Calikes, Councillor Joe
Fagan (ex officio), Councillor Mark Horsham 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); K Gowrie, Finance Manager (Resources); E-A McGonigle,
Administration Adviser; E McPake, HR Business Manager; A Norris, Administration Assistant
Health and Social Care/Social Work Resources
S Sengupta, Director; I Beattie, Head of Health and Social Care (Hamilton and Clydesdale); G
Booth, Justice Service Manager (Children and Justice Services); D Dobbie, Service Manager
(Children and Justice); M Kane, Service Development Manager; M McConnachie, Adult and Older
People Service Manager; J O’Boyle, Technology Enabled Care Service Manager 
Order of Business
The Committee decided: that the items of business be dealt with in the order
minuted below. 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting
The minutes of the meeting of the Social Work Resources Committee held on 29 January 2025
were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Social Work Resources – Revenue Budget Monitoring 2024/2025 
A joint report dated 7 March 2025 by the Executive Director (Finance and Corporate Resources)
and the Director, Health and Social Care was submitted comparing actual expenditure for the
period 1 April 2024 to 24 January 2025 against budgeted expenditure for 2024/2025 for Social
Work Resources, along with a projection for the year to 31 March 2025.
2
5

Page 6

As at 24 January 2025, there was an underspend of £1.189 million, before transfers to reserves. 
Following the probable outturn exercise, the forecast for the budget to 31 March 2025 was a
breakeven position, as approved at the Executive Committee on 12 February 2025.  Virements
proposed to realign budgets were detailed in appendices B to F to the report.   
The Committee decided: 
(1) that the forecast to 31 March 2025 of a breakeven position after approved transfers to
reserves, as detailed in Appendix B of the report, be noted; and 
(2) that the proposed budget virements be approved. 
[Reference: Minutes of 29 January 2025 (Paragraph 3) and Minutes of the Executive
Committee of 12 February 2025 (Paragraph 3)] 
4 Social Work Resources – Capital Budget Monitoring 2024/2025 
A joint report dated 24 February 2024 by the Executive Director (Finance and Corporate
Resources) and the Director, Health and Social Care was submitted advising of progress on the
Social Work Resources’ capital programme for 2024/2025 and summarising the expenditure
position for the period 1 April 2024 to 24 January 2025. 
The revised Capital Programme for 2024/2025 amounted to £1.027 million, as approved by the
Executive Committee on 26 June 2024, with the forecast for the financial year being £1.027
million.  Actual expenditure as at 24 January 2025 was £0.529 million. 
The Committee decided: that the Social Work Resources’ capital programme of
£1.027 million, and forecast expenditure of £1.027 million,
be noted. 
[Reference: Minutes of 29 January 2025 (Paragraph 4) and Minutes of the Executive
Committee of 26 June 2024 (Paragraph 6)] 
5 Social Work Resources – Workforce Monitoring – December 2024 and January
2025 
A joint report dated 5 March 2025 by the Executive Director (Finance and Corporate Resources)
and the Director, Health and Social Care was submitted on the following employee information
for Social Work Resources for the period December 2024 and January 2025:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 14 December 2024 
The HR Business Manager responded to members’ questions on various aspects of the report. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 29 January 2025 (Paragraph 5)] 
6

Page 7

6 Social Work Resources’ Risk Register Update 
A report dated 5 March 2025 by the Director, Health and Social Care was submitted providing
an update on risk management arrangements and the Risk Register for Social Work Resources. 
The top risks identified for the Resource, that is those that were residually scored as being very
high, were attached in Appendix 1 to the report.  A wider suite of areas that were subject to
proportionate monitoring, mitigation and review was detailed in Appendix 2 to the report.   
Throughout the COVID-19 pandemic, risk register update reports had been provided to the
Social Work Resources Committee at each meeting rather than the normal annual report to
Resource Committees.  That arrangement was not intended to be indefinite and, following
consideration by the Chair and Depute Chair, risk register reports would now be provided to the
Committee on a 6-monthly basis. 
Officers responded to members’ questions on various aspects of the report.   
The Committee decided: 
(1) that the content of the report be noted; and 
(2) that the set of top risks for Social Work Resources be approved. 
[Reference: Minutes of 29 January 2025 (Paragraph 7)] 
7 Strengthening Public Protection 
A joint report dated 7 March 2025 by the Executive Director (Finance and Corporate Resources)
and the Director, Health and Social Care was submitted on developments to strengthen local
public protection capacity with due regards to Adult Support and Protection, Mental Health, and
Adults with Incapacity legislation. 
Public protection remained a core priority for the Council and the Health and Social Care
Partnership (HSCP), with a focus on supporting the most vulnerable.  The public protection
landscape continued to be particularly challenging, with increased activity being seen across
legislation relating to Adult Support and Protection, Mental Health and Adults with Incapacity. 
There was a welcome, albeit challenging, emphasis on preventative action which included
suicide prevention, as set out in the Scottish Government and COSLA ‘Creating Hope Together
Strategy’.  Information on Creating Hope Together, which was Scotland’s Suicide Prevention
Strategy for the period 2022 to 2032, was provided in paragraph 4.1 of the report.   
To enhance the focus on suicide prevention within local public protection arrangements, it was
proposed that a post of Senior Practitioner post on Grade 3, Level 8, SCP 79-80 (£62,251 to
£63,479) be added to the Social Work Resources’ establishment on a permanent basis. 
The post would have links to the Child and Adult Protection Committees and support shared
understanding of mental health and suicide.  The post would be funded from the monies
retained to recommission mental health services arising from previous contract reviews, as
detailed in paragraph 6.1 of the report. 
The Committee decided: 
(1) that the content of the report be noted; and 
(2) that the changes to the Social Work Resources’ staffing establishment, as detailed in
section 5 of the report, be approved.
7

Page 8

8 Strengthening Technology Enabled Care Capabilities 
A joint report dated 7 March 2025 by the Executive Director (Finance and Corporate Resources)
and the Director, Health and Social Care was submitted on the ongoing development of
Technology Enabled Care (TEC) by the Council. 
TEC played a pivotal role in achieving the strategic goal of supporting people to live
independently and safely at home.  The South Lanarkshire University Health and Social Care
Partnership (HSCP) TEC team was responsible for essential elements such as programming,
monitoring, installing and recycling digital alert alarms as well as troubleshooting digital alert
alarms faults.  Some of the recent activities undertaken by the TEC team were a new
requirement arising from the Council’s transformation from analogue to digital telecare.     
The Digital Team had been established on an initial fixed-term basis to support the transition
from analogue to digital.  Given the performance to date, ongoing need and further areas for
development as highlighted in the report, it was proposed that the following 8.4 FTE fixed-term
posts, as detailed in section 5 of the report, be made substantive to ensure the safety and
reliability of the community alarm service:- 
 4 FTE posts of Digital Telecare Assistants on Grade 2, Level 2 to 4, SCP 39-57 (£37, 285
to £46.290)
 4 FTE posts of Technology Assistants on Grade 1, Level 1 to 2, SCP 20-23 (£30,063 to
£31,095)
 0.4 FTE post of Telecare Development Officer on Grade 3, Level 4, SCP 72-74 (£56,843
to £58,062) 
The funding of the posts was outlined in section 6 of the report as follows:- 
 funding earmarked by the South Lanarkshire Integration Joint Board (IJB) would be used
for the Digital Telecare Assistants
 budget released by the reduction in external expenditure, as detailed in paragraph 6.1.2,
would fund the Technology Assistant posts
 NHS Lanarkshire had agreed to fund the Telecare Development Officer post for the
duration of the existing member of staff’s employment 
The Committee decided: 
(1) that the content of the report be noted; and 
(2) that the changes to the Social Work Resources’ staffing establishment, as detailed in
section 5 of the report, be approved. 
9 Adoption Allowance Scheme 
A report dated 11 March 2025 by the Director, Health and Social Care was submitted providing
an update on proposed changes to the current Adoption Allowance Scheme. 
A National Review of Care Allowances had been published in 2018 which highlighted that each
local authority was able to develop their own Adoption Allowance Scheme within the parameters
of the Adoption and Children (Scotland) Act 2007 (the 2007 Act).  Under the 2007 Act, local
authorities had a duty to assess someone’s need for adoption support services and to provide
this support.
8

Page 9

Adoption Support Services and Allowances (Scotland) Regulations 2009 came into force on 28
September 2009, replacing the Adoption Allowances (Scotland) Regulations 1996.  Under those
Regulations, South Lanarkshire Council, as an adoption agency, could make payments to
adoptive parents who met the criteria for adoption allowances.  The adoption and fostering
regulations stipulated that a financial assessment required to be undertaken in advance of the
payment of an Adoption Allowance.   
The central principle was that an Adoption Allowance was payable to an adoptive parent for the
purpose of supporting the placement of the adoptive child or the continuation of adoptive
arrangements after an adoption order was made.  An Adoption Allowance could be provided
following a financial assessment of the family and when it was required to cover additional
expenditure related to the needs of the child.  The assessment had to take account of income
and expenditure and, on that basis, the cost of meeting a child’s needs. 
On 29 August 2024, following agreement between the Scottish Government and COSLA, the
introduction of the Scottish Recommended Allowance (SRA) for Foster and Kinship Carers was
announced.  Additional funding had been provided to implement those changes.  This marked
the first time a set minimum rate had been introduced which all local authorities had to pay.  This
had been implemented for foster carers and kinship carers within South Lanarkshire.   
Prior to the introduction of the SRA, Adoption Allowances had been paid at the same rate as the
Fostering Allowance.  No additional funding had been provided and there was no requirement to
pay Adoption Allowances at the same rate as the SRA.   
As part of the Budget Recovery Plan prepared to address the Children and Families recurring
funding gap of £10.6 million, a review of Adoption Allowances had been completed.  The
Sustainability and Value Option Approach had been used for appraisal, as detailed in paragraph
4.7 of the report.  The proposed changes to Adoption Allowances, appraised as ‘benchmarking
and efficiencies’, would meet the Council's statutory requirements.  The proposed changes
would result in a reduction in expenditure of £0.082 million per annum, as detailed in paragraph
6.1 of the report. 
The proposed changes to the payment of Adoption Allowances were set out in section 4 of the
report as follows:- 
 the introduction of a start-up grant of £750 per child placed which would replace the
current pre-Adoption Allowance
 setting a maximum time limit of 3 years for payment of Adoption Allowances
 Adoption Allowances would no longer be paid for young people turning 18 (as of 1 April
2025), unless there were exceptional circumstances 
Following the 3-year time limit period, adoptive parents would be able to request a further
adoption support plan.  This would include a full financial assessment which ensured the
maximisation of universal benefits, or additional funding and independent scrutiny through
presentation at South Lanarkshire’s Adoption and Fostering Panel. 
Carers with young people turning 18 as of 1 April 2025 would be notified of those changes
which, if endorsed by the Committee and approved by the Executive Committee on 30 April
2025, would take effect from 1 July 2025.  If required, families would be supported to seek
advice from the Money Matters Team to ensure all efforts had been made to maximise income
from benefits.
9

Page 10

Adoption Allowances were paid quarterly in advance and, if a payment had been made for a
young person where the allowance would now end, families would not be asked to repay any
such allowance.  No effort would be made to recover payments already made to families.  For
carers who were in receipt of current Adoption Allowance payment for young people over 18
years of age, individual meetings would take place to discuss an appropriate timescale to bring
those payments in line with the new criteria. 
The Service Manager (Children and Justice) responded to a member’s question in relation to
SRA for Foster and Kinship Carers and confirmed there was no requirement to pay Adoption
Allowances at the same rate as the SRA. 
The Committee decided: that the proposed changes to the current Adoption
Allowance Scheme, as detailed at section 4 of the report,
be endorsed. 
The Committee recommended
to the Executive Committee:
that the proposed changes to the current Adoption
Allowance Scheme be approved. 
[Reference: Minutes of 6 March 2024 (Paragraph 8)] 
10 Review of Emergency Social Work Services 
A joint report dated 7 March 2025 by the Executive Director (Finance and Corporate Resources)
and the Director, Health and Social Care was submitted providing an update on the Emergency
Social Work Services (ESWS) Review. 
As part of the Budget Recovery Plan prepared to address the Children and Families recurring
funding gap of £10.6 million, a review of ESWS had been completed.  The Sustainability and
Value Option Appraisal Option approach was used for the review to ensure that resources were
focused on statutory duties, as detailed in paragraphs 4.1 to 4.3 of the report, and 4 models of
service delivery were considered. 
The ESWS Review options appraisal, with scoring, was attached in the appendix to the report
and highlighted that Option 2 provided the highest overall weighting, reducing dependency on
the availability list and on-call rota.  Detailed information on the recommended future delivery
model (Option 2) for ESWS was provided in section 5 of the report.  The changes to the ESWS
establishment associated with this delivery model were detailed at section 6 of the report as
follows:- 
 retention of the 1 FTE Fieldwork Manager on Grade 5, Level 2, SCP 96-97 (£80,504 to
£81,747)
 creation of 2.5 FTE posts of Operations Manager on Grade 4, Level 2 to 5, SCP 87-92
(£70,397 to £75,884)
 reduction of the number of Team Leader posts from 5 FTE to 2.5 FTE on Grade 3, Level 8,
SCP 85-86 (£68,380 to £69,365)
 increasing the number of Social Work Assistant posts from 2.69 FTE to 5 FTE on Grade 2,
Level 4, SCP 63-65 (£50,417 to £51,520)
 deletion of the 1.03 FTE Social Worker post on Grade 3, Level 4, SCP 79-80 (£62,541 to
£63,479) 
While the review of ESWS recommended a service redesign, this would not generate a financial
contribution to the Budget Recovery Plan and alternative options would require to be identified. 
A budget recovery report would be submitted to a future meeting of the Committee, as detailed
in paragraph 7.2.
10

Page 11

The Service Manager (Children and Justice) responded to members’ questions on various
aspects of the report. 
The Committee decided: 
(1) that the review of Emergency Social Work Services (ESWS) be noted; 
(2) that the preferred model from the Options Appraisal, as detailed at section 5 of the report,
be noted; 
(3) that the posts identified, as detailed at section 6, Table 1 of the report, be approved to be
added to the establishment for ESWS; and 
(4) that the intention to bring a further budget recovery report back to Committee with other
options be noted. 
[Reference: Minutes of the Executive Committee of 25 June 2008 (Paragraph 24)] 
11 Sustaining Social Work Children And Families Services: Budget Recovery Update 
A joint report dated 17 February 2025 by the Executive Director (Finance and Corporate
Resources) and the Director, Health and Social Care was submitted providing an update on
actions outlined within the Children and Families Budget Recovery Plan. 
The report provided a breakdown of the Children and Families recurring funding gap of £10.6
million, and an update in relation to the actions taken to address that recurring budget gap going
forward, with areas of ongoing reviews in relation to:- 
 Adoption Allowances, as detailed in section 5 of the report
 Emergency Social Work Services (ESWS), as detailed in section 6 of the report
 externally procured provision, as detailed in section 7 of the report 
The full year anticipated benefit to be realised when the actions were complete totalled £6.963
million and the phased achievement of those would continue to be monitored.  An updated
budget recovery report would be brought to the Committee in September 2025 which would
outline other actions and options being considered by the Resource to address the budget
deficit. 
The Committee decided: 
(1) that the contents of the report be noted; 
(2) that the update on the review of adoption allowances be noted; 
(3) that the update on the review of Emergency Social Work Services (ESWS) be noted; 
(4) that the reduction in expenditure achieved from recommissioning external services be
noted; and 
(5) that it be noted that an updated budget recovery report would be brought back to
Committee on 10 September 2025. 
[Reference: Minutes of 29 January 2025 (Paragraph 9)] 
11

Page 12

12 South Lanarkshire Justice Social Work Community Payback Annual Report
2023/2024 
A report dated 7 February 2025 by the Director, Health and Social Care was submitted:- 
 notifying the Committee of South Lanarkshire’s Community Justice Scotland Community
Payback Order (CPO) Annual Report 2023/2024
 highlighting the main themes from South Lanarkshire’s Community Payback Annual
Report 2023/2024 
The CPO Annual Report 2023/2024, attached as Appendix 1 to the report, had been submitted
to Community Justice Scotland (CJS) on 29 September 2024 in accordance with section 2272M
of the Criminal Procedure (Scotland) Act 1995. 
The format of the CPO Annual Report 2023/2024 differed from previous reports.  A template of
questions and case studies for local areas to complete had been developed by Justice Social
Work, the Scottish Government and Social Work Scotland.  The questions focused on examples
of how the work reduced the risk of reoffending and addressed the underlying needs of
substance use and mental health.  The report provided information in relation to case studies,
unpaid work and new areas of development. 
The Committee decided: that the content of the South Lanarkshire Community
Payback Order Annual Report 2023/2024 be noted. 
[Reference: Minutes of 6 December 2023 (Paragraph 12)] 
13 Justice Services Unpaid Work Service - Update 
A report dated 12 February 2025 by the Director, Health and Social Care was submitted:- 
 providing an analysis of the increase in Community Payback Orders (CPO) with Unpaid
Work (UPW) requirements and associated backlog hours from 2019 to 2024
 reporting on Social Work Resource Plan Performance Indicators for Quarters 1 to 3 in
2024/2025 which were not meeting target(s) for those who had committed offences and
measures taken to increase immediate commencement of Order
 notifying of key initiatives UPW had been involved in over this period and future digital
solution developments 
Since 2019, South Lanarkshire Council’s Justice Social Work had seen an increase in CPOs
with UPW requirements being imposed by Sheriff Courts.  Section 3 of the report provided
detailed analysis and data trends for CPOs with UPW requirements from Quarter 1 2019/2020
to Quarter 3 2024/2025.  Measures to enhance Justice Social Work’s capacity to create more
placements and casework were supported by the Committee on 30 October 2024. 
Section 4 of the report provided details on the specific indicators, included in the Social Work
Resource Plan for Quarters 1 to 3 in 2024/2025.  Justice Social Work had been unable to meet
agreed targets consistently over 2024/2025, the reasons for which were complex, as detailed in
paragraphs 4.3 and 4.4 of the report.  A short life working group had been established to review
the commencement of Order and placement, and remedial actions, as detailed in paragraph 4.5
of the report, had been put in place.
12

Page 13

Information was provided on a range of key initiatives that UPW had been involved in at section
5 of the report.  Furthermore, information was provided on future developments at section 6 of
the report, which included a collaboration of Justice Social Work and West Lothian and Glasgow
Justice Services with the national improvement organisation for local government in Scotland
(Improvement Service) to develop a robust digital solution for the management of UPW
placements and service user order completion. 
The Justice Service Manager (Children and Justice Services) responded to members’ questions
on various aspects of the report. 
The Committee decided: that the content of the report be noted. 
[Reference: Minutes of 30 October 2024 (Paragraph 7)] 
14 Family Support Strategy – Annual Report 
A report dated 26 February 2025 by the Director, Health and Social Care was submitted
providing an update on South Lanarkshire’s Family Support Strategy and the progress made in
shifting resources to community-based support to enhance earlier help and family support
services. 
Information was provided on the establishment of the 4 community-facing Family Support Hubs,
with their Year 2 Annual Report attached as an appendix to the report.  A short video was shown
on the Family Support Hubs in South Lanarkshire. 
The Service Manager (Children and Justice) responded to members’ questions on various
aspects of the report and, where information was not readily available, undertook to provide this
to relevant members. 
The Committee decided: that the contents of the report and the Family Support
Hub’s Annual Report 2024, attached at Appendix 1, be
noted. 
[Reference: Minutes of 6 March 2024 (Paragraph 11) and Minutes of the Executive Committee
of 1 March 2023 (Paragraph 7)] 
15 Response to the Scottish Government Consultation on Developing a Universal
Definition of ‘Care Experience’ 
A joint report dated 19 February 2025 by the Director, Health and Social Care and the Interim
Executive Director (Education Resources) was submitted on the Council’s response to the
Scottish Government’s consultation on Developing a Universal Definition of ‘Care Experience’. 
A consultation on developing a universal definition of ‘Care Experience’ was commenced by the
Scottish Government in autumn 2024.  The response had been jointly prepared by Social Work
and Education Resources and had also been informed by the views of local stakeholders,
including South Lanarkshire’s Champions Board.  The consultation response, which had been
agreed in consultation with the Chair of the Committee due to the timescales for submission,
was provided in the appendix to the report.   
The Committee decided: 
(1) that the content of the report be noted; and
13

Page 14

(2) that the appended response to the Scottish Government’s consultation on the Developing
a Universal Definition of ‘Care Experience’, submitted on 31 January 2025 following
consultation with the Chair of the Social Work Resources Committee, be noted. 
16 Urgent Business 
There were no items of urgent business. 
14

Page 15

Report 
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)
Director, Health and Social Care  
Subject: Social Work Resources – Workforce Monitoring –        
1 February to 31 March 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for 1 February to 31 March 2025 relating to
Social Work Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): -
[recs]
(1) that the following employment information for 1 February to 31 March 2025
relating to Social Work Resources be noted:- 
 attendance statistics.
 occupational health.
 accident/incident statistics.
 discipline, grievance and Dignity at Work cases.
 analysis of leavers and exit interviews.
 staffing watch as of 8 March 2025 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Social Work
Resources provides information on the position for 1 February to 31 March 2025. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of March 2025 for Social
Work Resources. 
The Resource absence figure for March 2025 was 8.6%, this figure has increased by
0.1% when compared to the previous month and is 1.8% higher than the Council-
wide figure.  Compared to March 2024, the Resource absence figure has increased
by 0.7%. 
Based on absence figures as at March 2025 and annual trends, the annual average
absence for the Resource for 2024/2025 is 8.1%, compared to a Council-wide
average figure of 5.9%. 
3
15

Page 16

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence.
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health overall, 267 referrals were made this
period. This represents a decrease of 11 when compared with the same period last
year. 
4.3. Accident/Incident Statistics
There were 19 accidents/incidents recorded and investigated within the Resource
this period. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 8 disciplinary hearings were held within the Resource, this is an
increase of 6 when compared to the same period last year.  No appeals were heard
by the Resource and no appeals were pending, these figures have remained the
same when compared to last year.  One grievance hearing took place within the
Resource, this figure has increased by one when compared to the same period last
year and 7 Dignity at Work complaints were raised, this is an increase of 7 when
compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2a) 
There were a total of 11 leavers this period eligible for an exit interview.  This figure
has decreased by 15, when compared with the same period last year.  One exit
interview were conducted in this period, this figure has decreased by 6 when
compared to the same period last year. 
5. Staffing Watch (Appendix 3)
5.1. There has been a decrease of 22 employee in post from 14 December 2024 to 8
March 2025. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in terms 
of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
16

Page 17

10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor 
Executive Director (Finance and Corporate Resources) 
Professor Soumen Sengupta
Director, Health and Social Care 
6 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Social Work Resources – 26 March 2025 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Eileen McPake, HR Business Manager
Ext: (Tel: 01698 454647)
E-mail:  Eileen.McPake@southlanarkshire.gov.uk 
17

Page 18

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 6.2 6.5 6.5 April 12.6 9.4 8.8 April 8.3 7.4 7.3 April 5.6 5.1 5.2
May 5.7 5.8 5.8 May 10.1 8.4 9.5 May 7.1 6.6 7.0 May 5.4 5.1 5.3
June 5.9 5.5 6.0 June 11.3 8.6 9.2 June 7.6 6.5 7.0 June 5.3 4.7 5.2
July 6.0 5.4 6.5 July 11.8 8.8 11.2 July 7.9 6.5 8.0 July 4.6 3.8 4.1
August 6.0 4.8 6.9 August 10.8 8.6 11.4 August 7.5 6.0 8.4 August 4.4 4.1 4.7
September 5.9 5.6 7.2 September 9.6 9.3 12.0 September 7.1 6.8 8.8 September 5.4 5.3 6.1
October 5.8 6.5 7.5 October 10.4 8.5 11.0 October 7.3 7.1 8.6 October 5.8 5.1 6.0
November 6.0 7.3 8.1 November 10.4 9.0 10.0 November 7.4 7.8 8.7 November 6.5 6.2 6.9
December 6.4 7.4 7.0 December 10.6 9.5 11.6 December 7.7 8.1 8.5 December 7.0 6.6 7.0
January 5.2 7.0 6.7 January 12.0 10.3 11.3 January 7.4 8.1 8.2 January 5.8 6.1 6.7
February 5.8 7.0 7.0 February 11.0 9.9 11.6 February 7.5 7.9 8.5 February 5.9 6.4 7.0
March 7.0 7.1 7.5 March 10.9 9.4 10.7 March 8.2 7.9 8.6 March 6.4 6.3 6.8
Annual Average 6.0 6.3 6.9 Annual Average 11.0 9.1 10.7 Annual Average 7.6 7.2 8.1 Annual Average 5.7 5.4 5.9
Average Apr-Mar 6.0 6.3 6.9 Average Apr-Mar 11.0 9.1 10.7 Average Apr-Mar 7.6 7.2 8.1 Average Apr-Mar 5.7 5.4 5.9
1768 1025 2793 15626No of Employees at 31 March 2025 No of Employees at 31 March 2025 No of Employees at 31 March 2025 No of Employees at 31 March 2025
Appendix 1
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Social Work Resources
APT&C Council WideResource TotalManual Workers
18

Page 19

Feb - Mar Feb - Mar
2024 2025
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 85 88
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 1 2
TOTAL 278 267
Feb - Mar Feb - Mar
2024 2025
Minor 12 11
Near Miss*** 1 0
Violent Incident:  Physical**** 16 1
Violent Incident:  Verbal***** 8 7
Total Accidents/Incidents 37 19
Feb - Mar Feb - Mar
2024 2025
Total Number of Hearings 2 8
Time Taken to Convene Hearing October - Feb to Mar 2025
0-3 Weeks 4-6 Weeks Over 6 Weeks
6 1 1
Feb - Mar Feb - Mar
2024 2025
Number of Grievances 0 1
Still in Progress 0 1
Feb - Mar Feb - Mar
2024 2025
Number of Incidents 0 7
Still in Process 0 7
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
3 6
94 84
CAUSE OF ACCIDENTS/INCIDENTS
Appendix 2
SOCIAL WORK RESOURCES
95 87
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different 
19

Page 20

Feb - Mar Feb - Mar
2024 2025
Career Advancement 4 4
Child Caring / Caring Responsibilities 0 1
Further Education 1 0
Moving outwith area 1 1
Personal Reasons 1 1
Other 19 4
Total Number of Leavers Eligible for Exit Interview 26 11
Number of Exit Interviews conducted 7 1
Percentage of interviews conducted 27% 9%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
SOCIAL WORK RESOURCES
20

Page 21

As at 8 March 2025
Total Number of Employees
F/T P/T F/T P/T
189 232 927 1411
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
3.00 320.84 1449.61 472.02 84.80 33.60 0.00 1.00 0.00 2364.87
As at 14 December 2024
Total Number of Employees
F/T P/T F/T P/T
194 230 949 1408
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
3.00 332.43 1453.91 474.98 85.77 35.51 0.00 1.00 0.00 2386.60
Salary Bands
MALE FEMALE TOTAL
2781
*Full - Time Equivalent No of Employees
Appendix 3
JOINT STAFFING WATCH RETURN
SOCIAL WORK RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
2759
MALE FEMALE TOTAL
21

Page 22

22

Page 23

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 11 June 2025
Report by: Director, Health and Social Care  
Subject: Social Work Resource Plan 2024/2025: Quarter 4
Progress Report 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 present the Social Work Resource Plan 2024/2025 Quarter 4 Progress Report for
the period 1 April 2024 to 31 March 2025
[1purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the Social Work Resource Plan 2024/2025 Quarter 4 Progress Report, 
as summarised in paragraph 5.2. and attached as Appendix 2, be noted; 
(2) that the key achievements made by the Resource to date, as detailed in
paragraph 5.3., be noted; and
(3) that the areas for improvement and associated management actions, as
detailed in paragraph 5.4., be noted. 
3. Background
3.1. The Social Work Resource Plan 2024/2025 was approved by the Committee on 22
May 2024, and sets out the outcomes, measures and actions to be managed and
delivered by the Resource for the financial year 2024/2025.   
3.2. The Resource Plan follows the agreed corporate structure and style. The Plan is a
key element of the Council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the Outcomes set out in the Council Plan
Connect 2022 to 2027. 
4. Resource Outcomes 2024/2025
4.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2024/2025.  These are detailed in Appendix 1. 
5. Quarter 4 Progress Report 2024/2025
5.1. Progress against all Resource Plan measures is contained in the Quarter 4 Progress
Report 2024/2025, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe, and uses a traffic
light format with the following definitions to give a status report on each measure:  
4
23

Page 24

Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
Contextual Included for ‘information only’, to set performance information in context 
5.2. Measures which are classified as ‘red’ and/or ‘amber are considered in detail at
section 5.4. of this report. To ensure adequate scrutiny of performance across all
Resources, the Council’s Performance and Review Scrutiny Forum may consider
‘red’ and/or ‘amber’ measures at a future meeting. 
The overall summary of progress to date is set out in the table below. 
Status Measures
Statistical Project Total %
Blue 0 10 10 37%
Green  10 2 12 44%
Amber  2 0 2 7%
Red      2 1 3 11%
Report later/Contextual 0 0 0 0%
Totals                               14 13 27 100%
(Data correct 13 May 2025) 
5.3. Key achievements for 2024/2025, to date, are noted below:- 
Connect Outcome Communities and Environment 
Resource
Outcome
Achievement 
Strengthen
engagement with
service users and
carers
In 2024/2025, South Lanarkshire University Health and Social
Care Partnership received a total of 685 stories from service users,
patients, their families and carers via Care Opinion.  Care Opinion
is enhancing our understanding of people’s experiences with
health and care and has been crucial in helping us build on our
strengths while also identifying areas for improvement, allowing us
to make targeted refinements wherever appropriate.
Connect Outcome Health and Wellbeing 
Resource
Outcome
Achievement 
Care and protect
children, young
people and adults
from risk of harm
Equal Say, the adult Advocacy commissioned service, completed
its first year of Operation in October 2024.  Quarterly reports show
increased activity in referrals of over 150 per quarter, and
prominent advocacy issues associated with Mental Health
Legislation, Adults with Incapacity, and Adult Support and
Protection. 
Lanarkshire Advocacy Planning Working Group are refreshing the
Lanarkshire Advocacy Plan 2020 to 2025 ensuring that Advocacy
supports the voice of service users and carers be heard and the
importance of those Advocacy services to the most vulnerable
24

Page 25

groups within our communities. 
Promote self-care
and self-
management 
Lanarkshire Carers continues to develop and evolve its
“CarerSpace” online portal to start or continue a conversation. It is
a toolkit developed by carers for carers that helps explore various
aspects of a carers life, focusing on what matters to them. Once
submitted staff from Lanarkshire Carers can pick up the
conversation with the carer. 
Take Control, the commissioned service for independent advice
and information on Self-directed Support, has worked with 400
South Lanarkshire residents exercise choice and control over their
care and support arrangements.  
Community Justice
Outcome
Improvement Plan
(CJOIP) is
progressed
The Recovery Orientated Justice Service approach aligns with the
CJOIP, in respect of priority aim 1, Optimise the use of diversion
and intervention at the earliest opportunity.  The service embeds a
public health approach that aligns with local and national
objectives to reduce crime and reducing risks associated with drug
related deaths, by providing tailored support to those in the justice
system who experience harm, as a result of alcohol and drug use. 
A mid-term review (December 2024) found that SL Alcohol and
Drug Problem Solving Court (ADPSC) had achieved systemic and
individual success. Both qualitative and statistical data reported
improvements in the lives of service users, with offending and
substance use generally decreasing for most service users since
being placed on Structured Deferred Sentencing.
• 100% of service users on Structured Deferred Sentencing
who use substances had been provided pathways into either
wider employment, housing, and some form of health and
welfare opportunities. 
• 97% of service users on Structured Deferred Sentencing
disposal were sustaining or had completed their period of
support.
• 97% of service users received medically assisted treatment
and/or recovery plans in conjunction with access to
community-oriented recovery networks.  
• 100% of service user families with lived experience had been
provided with advice and support in the recovery journey.
Note, the numerical figure may change significantly
dependent upon definitions and measurements used. 
Full details of the mid-term review will be reported to Social Work
Committee in June 2025.
Disadvantaged
people/groups are
provided with
access to timely
support and
interventions
See Hear Strategic Working Group hosted an information event in
Hamilton on 29 May 2024.  Twenty-two organisations contributed
to the event focused on sensory services for hearing and sight. 
The Director attended the event, thanking all the services for their
continued support to South Lanarkshire Residence.
Work with our
communities to
deliver person-
centred care and
support
Care at Home teams, including Home Assessment, have been
subject to inspection by the Care Inspectorate during 2024/2025. 
The feedback has been positive throughout with almost all areas of
inspection graded as ‘very good’ or ‘good’ and inspectors
highlighting significant strengths in relation to the delivery of care;
positive outcomes for people; strong leadership; and a highly
trained workforce.  The gradings and positive feedback are
testament to the substantial programme of redesign and
modernisation over the last five years in response to the serious
concerns identified by the Care Inspectorate in 2019.
25

Page 26

Connect Outcome Children and Young People 
Resource
Outcome
Achievement
Improve the health
and wellbeing of
children, young
people and families 
A new partnership project, led by Social Work and Housing in
cooperation with Barnardo’s and supported by the National Lottery
Community Fund, has been helping young people transition from
care into their own accommodation. The project was developed
with the assistance of the members of the South Lanarkshire
Champions Board, a group of care-experienced young people who
advocate for the needs of their peers and shape services within the
South Lanarkshire area. 
The Futures project provides wrap around support to young people
leaving care and moving to independent living for the first time.
This is done by providing four, furnished training flats together with
intensive support to assist the young people in developing skills for
setting up their home, maintaining a successful independent
tenancy and building local community connections and networks
before moving to fully independent living.
Connect Outcome Delivering the Plan and achieving Best Value 
Resource
Outcome
Achievement
Digital and ICT
services meet the
needs of the
council and its
customers
As part of the Glasgow City Region Smart & Connected Social
Places (SCSP) 5G Innovation Fund, South Lanarkshire University
Health and Social Care Partnership has engaged with Care
Messenger Holdings Ltd to deliver an innovative project that
provides commercial LG Smart TV products to residents living
within David Walker Gardens care home for older people. 
Residents who wish to participate in the project can communicate
directly via text message or video call with care home staff, their
families, befrienders or other professionals, via their TV.  Initially 20
TVs were installed within residents' rooms, and this has since been
offered to all 50 residents across the whole care home.  Early
evaluation indicates a positive impact on social isolation and
loneliness with improved wellbeing of residents and increased
connectivity with families.  Care home staff have also found that
this enhances other forms of communication that they use to
support residents.   
5.4. Areas for improvement
Measures that have been classified as ‘red’ (not on course to achieve target or major
slippage) or ‘amber’ (minor slippage against timescale or shortfall against target) are
noted below, together with the reason why, and the management action now being
taken, where required. 
Measure  Comments/Progress Action by Manager 
(where applicable)
Percentage of
reports submitted
to the Children’s
Reporter within
agreed
timescales.
To date, 72% (214 out of 298) of
reports submitted to the Children's
Reporter were sent within agreed
timescales. Reporting in early
2024/2025 highlighted a performance
issue against this measure (58% in
Q1 and 52% in Q2). 
Action was taken by the
service to increase local
monitoring and establish
regular meetings with the
Scottish Children's Reporters
Administration. Whilst the year-
to-date position has not met
the 75% annual target,
improvement actions appear to
be making an impact and
performance has continued to
26

Page 27

Measure  Comments/Progress Action by Manager 
(where applicable)
improve from 85% in quarter 3,
to 91% in quarter 4.
Percentage of
people on CPO
unpaid work
requirement
seen within five
working days by
their case
manager.
In 2024/2025, 761 CPOs with Unpaid
Work requirements were issued, of
these 511 (67%) were inducted within
the 5 working days target. Of the 761
orders which were issued, 723 (95%)
have now been inducted. The 5%
which remain outstanding are as a
result of reasons including service
users not attending scheduled
appointment, illness, paid
employment, or a return to custody. 
To date, 61% (212 out of 350) of
Level 1 orders were seen within
timescales, whilst 73% (299 out of
411) of Level 2 orders were inducted
within timescales.
In 2024/2025, 45% of CPOs
with Unpaid Work requirements
were Level 1 orders, where
there is no justice social work
report requested by the court
prior to the order commencing
and, therefore, the service is
unable to engage with the
service user before court
appearance or monitor their
outcomes in court. 
A text reminder service has
been implemented for all
unpaid work service users to
encourage attendance at
unpaid work. This is supported
by 4 weekly reviews for all non-
attenders as standard,
regardless of circumstances, to
ensure robust management of
the order(s).
Percentage of
people starting
their placement
within seven
days of a CPO
unpaid work.
In 2024/2025, 761 CPOs with Unpaid
Work requirements were issued, of
these 497 (65%) started their
placement within the 7 working days
target. Of the 761 orders which were
issued, 723 (95%) have now started
their placement. The 5% which
remain outstanding are as a result of
reasons including service users not
attending scheduled appointment,
illness, paid employment, or a return
to custody. 
To date, 59% (205 out of 350) of
Level 1 orders started their placement
within timescales, whilst 71% (292 out
of 411) of Level 2 orders started
within timescales.
Percentage of
care at home
hours reduced
through Home
Assessment
Team
intervention.
In 2024/2025, care packages were
reduced on average by 29% following
Home Assessment Team (HAT)
intervention. In the same period, the
service supported over 1,000
episodes of care; and 50% of service
users who completed HAT
intervention either required reduced
or no support following intervention.
Performance has fallen slightly
short of the 30% annual target.
A review of the service model
and criteria for the service is
currently underway which is
expected to result in changes
to pathways, increasing the
flow and capacity through HAT
which will have a positive
impact on performance going
forward. 
Implement the
new Social Work
IT system by
October 2024.
The project to implement the new
social care information system
(Liquidlogic) is in the final stages of
implementation.  Of the key project
milestones, inclusive of data
migration, system configuration,
system integrations, testing and
business readiness, the vast majority
of activity is now complete.  
The remaining actions being
concluded to ensure the
system can go live relate to
one final piece of configuration
related to Self-directed Support
and Sourcing Care, final testing
of data being migrated and
ensuring the service is trained
and ready to embrace the new
27

Page 28

Measure  Comments/Progress Action by Manager 
(where applicable)
system.  The focus of activity
over the coming months will be
drawing these to a conclusion
such that the system can
successfully go live. 
6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable, and in turn the Performance Appraisal process for individual
employees. 
7. Financial Implications
7.1. The outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and, longer term, within the framework of
the council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change or environmental implications as a result of this report. 
8.2. The council acknowledges the serious and immediate threat of climate change and is
committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2024/2025. 
9.  Other Implications
9.1. A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
9.2. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and impact
assessment. 
Professor Soumen Sengupta 
Director, Health and Social Care 
1 May 2025 
Link(s) to Council Values/Priorities
 The Resource Plan has been structured upon the Vision, Values and Outcomes in the
Council Plan Connect 2022 to 2027 
Previous References
 Social Work Resources Plan 2024/2025 –Social Work Resources Committee on 22 May
2024
28

Page 29

List of Background Papers
 Council Plan Connect 2022 to 2027 – South Lanarkshire Council on 15 June 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Ciana Stewart, Planning and Performance Manager
E-mail:  Ciana.stewart@southlanarkshire.gov.uk
29

Page 30

Appendix 1
Social Work Resource Objectives 2024/2025  
Connect Outcomes Resource Outcomes
Communities and
Environment  
• Social Work Resources embeds sustainable
development across services
• Strengthen engagement with service users and
carers 
Education and Learning No Resource Outcomes for this Connect Outcome
Health and Wellbeing • Promote early intervention and prevention to achieve
healthy, active lives and reduce inequalities 
• Care and protect children, young people and adults
from risk of harm 
• Work with our communities to deliver person-centred
care and support 
• Continue to support carers good health and
wellbeing alongside their caring role 
• Promote self-care and self-management 
• Community Justice Outcome Improvement Plan is
progressed
• Disadvantaged people/groups are provided with
access to timely support and interventions 
• For those who have committed offences, safely and
effectively support them to reintegrate into the
community and realise their potential for the benefits
of all 
• Help people to continue to live within their homes
and communities through integrated community
health and social care services 
Children and Young
People
• Improve the health and wellbeing of children, young
people and families 
Housing and Land No Resource Outcomes for this Connect Outcome
Our Economy No Resource Outcomes for this Connect Outcome 
30

Page 31

IMPROVe - SLC Performance Management System Report printed on 21 May 16:16
Quarter 4 : April 2024 - March 2025
South Lanarkshire Council
Social Work
Resource Plan
(This represents the cumulative position to March 2025)
Performance Report 2024-25
Appendix 2
4
31

Page 32

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 21 May 16:16
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 1 0 0 0 1
Education and Learning 0 0 0 0 0
Health and Wellbeing 9 2 2 0 13
Children and Young People 0 0 0 0 0
Housing and Land 0 0 0 0 0
Our Economy 0 0 0 0 0
Delivering the plan and achieving best value 0 0 0 0 0
Total 10 2 2 0 14
Page 1
32

Page 33

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
Communities and Environment
Social Work Resources embeds sustainable development across services
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Evidence the use of recycled stock as a
percentage of all Equipu activity.
To date, 1,117 (22%) items from a total of 5,009 have been recycled,
with 364 of those items recycled in quarter 4. Performance exceeds the
annual target of 10% of recycled stock.
In quarter 4, 364 (19%) items were recycled from a total of 1,953 items.
People are encouraged to return all previously issued equipment to
ensure recycled items are available to select as first choice and the
measure exceeds target.
Green 10% 22% ------ ------ ------
Health and Wellbeing
Care and protect children, young people and adults from risk of harm
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of parental attendance at initial
Child Protection Planning meetings.
To date, 95% of parents invited to initial Child Protection Planning
meetings attended. Parents will continue to be encouraged to attend all
Children Protection meetings. This will be revisited at Locality Team
meetings to ensure a focus remains on familial participation.
Green 85% 95% ------ 89% 89%
Percentage of children seen by a
supervising officer within 15 days.
To date, 85% of children were seen by a supervising officer within 15
days of CSO being made at a hearing, performance continues to exceed
the annual target of 75%.
Green 75.0% 85.0% 94.0% 89.0% 57.0%
Page 2
33

Page 34

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
Health and Wellbeing
Care and protect children, young people and adults from risk of harm
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of reports submitted to the
Children’s Reporter within agreed
timescales.
To date, 72% (214 out of 298) of reports submitted to the Children's
Reporter were sent within agreed timescales. Reporting in early 2024/25
highlighted a performance issue against this measure (58% in Q1 and
52% in Q2).
Action was taken by the service to increase local monitoring and
establish regular meetings with the Scottish Children's Reporters
Administration. Whilst the year to date position has not met the 75%
annual target, improvement actions appear to be making an impact and
performance has continued to improve from 85% in quarter 3, to 91% in
quarter 4.
Amber 75.0% 72.0% 82.0% 77.0% 53.0%
Percentage of our care experienced
children and young people accommodated
in residential placements.
As at 31 March 2025, there were a total of 721 Looked After Children,
652 (90%) were looked after in a community setting and 69 (10%) were
looked after in a residential setting including local authority houses,
secure accommodation and residential schools, this position has been
maintained since 2021. This reflects South Lanarkshire’s commitment to
shift the way care is delivered to Looked After Children, with continued
support to children and young people within the community.
Green 10.0% 10.0% 10.0% 10.0% 10.0%
Percentage of statutory supervising officer
visits completed within timescale for local
authority welfare guardianship orders.
To date, there was a total of 243 local authority guardianship visits due
with 91% (220) being completed in time, exceeding the annual target.
In quarter 4, there was a total of 55 local authority welfare guardianship
visits due with 93% (51) being completed in time, exceeding the target of
75%.
Performance reports remain available to the locality teams providing
current performance levels.
Green 75% 91% 94% 93% 94%
Page 3
34

Page 35

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
Health and Wellbeing
Care and protect children, young people and adults from risk of harm
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of statutory supervising officer
visits completed within timescale for private
welfare guardianship orders.
To date, there was a total of 2214 private guardianship visits due with
87% (1932) being completed in time, exceeding the annual target.
In quarter 4, there was a total of 392 private guardianship visits due with
90% (353) being completed in time, exceeding the target of 75%.
Performance reports remain available to the locality teams providing
current performance levels.
Green 75% 87% 95% 93% 92%
Promote self-care and self-management
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of people participating in a
co-produced SDS Assessment to exercise
choice and control over their care.
To date 3,756 co-produced assessments have been approved
exceeding the annual target of 3,000 assessments.
In quarter 4, 1,031 co-produced assessments were approved, this
exceeds the quarterly target of 750 co-produced assessments.
Green 3,000 3,756 0 ------ 3,459
Increase number of people in receipt of
options 1, 2 and 3 exercising choice and
control over their care.
To date, 5,822 have received self-directed support care packages,
exercising choice and control over their care.  This is a 35% increase
from the quarter 1 position of 4,314 people and exceeds the annual 10%
target.
In quarter 4, a total of 4,609 people were in receipt of self-directed
support care packages exercising choice and control over their care.
Green 10% 35% 0% 0% 0%
Increase spend on adults in receipt of
option 1, 2 and 3 payments.
The annual commitment for adults in receipt of self-directed support
care packages was £85.8m.  This is a 21% increase from the 2023/24
quarter 4 position of £70.8m. The service exceeds the annual 10%
target, as some services will end, decrease or increase throughout the
course of the year.
Green 10% 21% 0% 0% 0%
Page 4
35

Page 36

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
Health and Wellbeing
For those who have committed offences, safely and effectively support them to reintegrate into the community and realise their potential for the benefits of all
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of people on CPO unpaid work
requirement seen within five working days
by their case manager.
In 2024/25, 761 CPOs with Unpaid Work requirements were issued, of
these 511 (67%) were inducted within the 5 working days target. Of the
761 orders which were issued, 723 (95%) have now been inducted. The
5% which remain outstanding are as a result of reasons including
service users not attending scheduled appointment, illness, paid
employment, or a return to custody.
In 2024/25, 45% of CPOs with Unpaid Work requirements were Level 1
orders, where there is no justice social work report requested by the
court prior to the order commencing and therefore the service is unable
to engage with the service user before court appearance or monitor their
outcomes in court.
To date, 61% (212 out of 350) of Level 1 orders were seen within
timescales, whilst 73% (299 out of 411) of Level 2 orders were inducted
within timescales.
A text reminder service has been implemented for all unpaid work
service users to encourage attendance at unpaid work. This is
supported by 4 weekly reviews for all non-attenders as standard,
regardless of circumstances, to ensure robust management of the
order(s).
Red 75.0% 67.0% 68.0% 69.0% 72.0%
Page 5
36

Page 37

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
Health and Wellbeing
For those who have committed offences, safely and effectively support them to reintegrate into the community and realise their potential for the benefits of all
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of people starting their
placement within seven days of a CPO
unpaid work.
In 2024/25, 761 CPOs with Unpaid Work requirements were issued, of
these 497 (65%) started their placement within the 7 working days
target. Of the 761 orders which were issued, 723 (95%) have now
started their placement. The 5% which remain outstanding are as a
result of reasons including service users not attending scheduled
appointment, illness, paid employment, or a return to custody.
In 2024/25, 45% of CPOs with Unpaid Work requirements were Level 1
orders, where there is no justice social work report requested by the
court prior to the order commencing and therefore the service is unable
to engage with the service user before court appearance or monitor their
outcomes in court.
To date, 59% (205 out of 350) of Level 1 orders started their placement
within timescales, whilst 71% (292 out of 411) of Level 2 orders started
within timescales.
A text reminder service has been implemented for all unpaid work
service users to encourage attendance at unpaid work. This is
supported by 4 weekly reviews for all non-attenders as standard,
regardless of circumstances, to ensure robust management of the
order(s).
Red 75.0% 65.0% 65.0% 67.0% 70.0%
Percentage of Justice Social Work reports
submitted to Court by the due date.
To date, 97% (1767 out of 1822) of Justice Social Work reports have
been submitted within timescale and performance continues to exceed
the 95% target for this measure.
In quarter 4, 99% (453 out of 459) of Justice Social Work reports have
been submitted within timescale. This position has increased from 97%
in quarter 3.
Green 95.0% 97.0% 99.0% 98.0% 98.0%
Page 6
37

Page 38

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Wednesday 21 May 2025
Resource Plan Performance Indicators South Lanarkshire Council - Social Work
Health and Wellbeing
Help people to continue to live within their homes and communities through integrated community health and social care services
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of care at home hours reduced
through Home Assessment Team
intervention.
In 2024/25, care packages were reduced on average by 29% following
Home Assessment Team (HAT) intervention. In the same period, the
service supported over 1,000 episodes of care; and 50% of service
users who completed HAT intervention either required reduced or no
support following intervention.
Performance has fallen slightly short of the 30% annual target. A review
of the service model and criteria for the service is currently underway
which is expected to result in changes to pathways, increasing the flow
and capacity through HAT which will have a positive impact on
performance going forward.
Amber 30.0% 29.0% 0.0% 0.0% 0.0%
Page 7
38

Page 39

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 1 0 0 0 0 1
Education and Learning 0 0 0 0 0 0
Health and Wellbeing 8 2 0 0 0 10
Children and Young People 1 0 0 0 0 1
Housing and Land 0 0 0 0 0 0
Our Economy 0 0 0 0 0 0
Delivering the plan and achieving best value 0 0 0 1 0 1
Total 10 2 0 1 0 13
Page 8
39

Page 40

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
Health and Wellbeing
Community Justice Outcome Improvement Plan is progressed
Action Measures Comments/ Progress Status
Embed the national
model for Community
Justice with our partners
in South Lanarkshire.
Present a progress report on the priorities set out within the
Community Justice Outcome Improvement Plan 2024-2029
by March 2025.
Report to be provided to Social Work committee in June 2025. Complete
Contribute to a reduction
of the national prison
population through the
use of SDS
assessments and
diversion from
prosecution.
Provide a report to Social Work Resources Committee on
progress by March 2025.
Report to be provided to Social Work committee in June 2025. Complete
For those who have committed offences, safely and effectively support them to reintegrate into the community and realise their potential for thebenefits of all
Action Measures Comments/ Progress Status
Promote the use of
alternatives to remand in
South Lanarkshire.
Provide a report to Social Work Resources Committee on
the use of diversion from prosecution, SDS assessments,
movement restriction conditions, restriction of liberty orders
and bail supervision as alternatives to remand by March
2025.
Report to be provided to Social Work committee in June 2025. Complete
Care and protect children, young people and adults from risk of harm
Action Measures Comments/ Progress Status
Monitor public protection
activity.
Report annually to the Community Planning Partnership on
public protection activity.
The Adult Protection annual report and Biennial Report 2022-24 was
presented the to the CPP for discussion at a meeting on 4 Dec 2024.
Complete
Page 9
40

Page 41

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
Health and Wellbeing
Care and protect children, young people and adults from risk of harm
Action Measures Comments/ Progress Status
Chief Social Work
Officer to provide
professional advice and
guidance to the Council
in accordance with
legislative duties.
Provide an annual report on key challenges, developments
and improvements across Social Work including service
quality, performance and delivery of statutory functions by
September 2024.
Action complete – document now published on SLC internet Complete
Communities and Environment
Strengthen engagement with service users and carers
Action Measures Comments/ Progress Status
Continue to support the
culture where
consultation and
participation is part of
the planning,
development and
delivery of all our
services.
Quarterly locality performance report on Care Opinion stories
to support evaluation, consultation and engagement with
service users and carers.
South Lanarkshire University Health and Social Care Partnership
continues to actively promote Care Opinion in various Partnership
forums and management meetings. In quarter 4, a total of 162 stories
were received from service users, patients and their families which is
an increase of one story from quarter 3. As of 1 April 2024, 685 stories
have been received.
Complete
Page 10
41

Page 42

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
Health and Wellbeing
Work with our communities to deliver person-centred care and support
Action Measures Comments/ Progress Status
Ensure monitoring,
compliance and control
of delivered services
Provide bi-annual reports to Social Work Committee on
internal registered care services
Action complete - brought forward and reported to Social Work
Resources Committee on 29 January 2025
Complete
Continue to support carers good health and wellbeing alongside their caring role
Action Measures Comments/ Progress Status
Report on services and
supports provided to
adult carers by
commissioned services.
Provide quarterly reports to Senior Management Team and
report to Social Work Resources Committee on the support
and services provided by commissioned third sector
organisations.
Lanarkshire Carers presented their quarter 3 performance report at a
regular monitoring meeting on 19 February 2025. In Q3, 301 new
carers identified, 342 Adult Carer Support Plans undertaken, 1233
carers engaged and supported, and 6210 carers accessing services.
The highest support needs identified as part of the Adult Carer Support
Plan conversation are information and advice, short breaks, emotional
support, and practical support.
The contract for Carers Supports and Services (Adults) with
Lanarkshire Carers has been extended, with a final year’s extension to
the existing arrangement due from 1 June 2025 until 31 May 2026.
Complete
Page 11
42

Page 43

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
Health and Wellbeing
Disadvantaged people/groups are provided with access to timely support and interventions
Action Measures Comments/ Progress Status
Report on MAT
Standards 6-10.
Report to Social Work Resources Committee on the
performance of MAT Standards 6-10.
Strong progress has been made on the ten MAT standards across
2024-25, five standards remain green, four are provisionally green and
one amber, however, MAT 7 remains red at quarter 4. In regard to MAT
standards 6 to 10; Psychologists within NHSL Addictions Services are
leading on MAT 6 and 10 which are provisionally green, the service is
working closely with the Psychology service to support staff in the MAT
10 implementation; the CAReS service is on track to complete the
training required for the MAT 6 submission; MAT 7 remains red and
plans to change to Vision Anywhere to improve information exchange
between Specialist Addictions Service and Primary Care General
Practice have been put on hold as INPS/Cegedim, the providers of
Vision systems, have gone into Administration; MAT 8 is green and the
commissioned organisation will work alongside South Lanarkshire’s
ADP (Alcohol and Drug Partnership) to ensure individuals impacted by
substance use who require independent advocacy services are
supported; MAT 9 is amber and an interim working group was formed
within NHS Lanarkshire’s Addictions services to review data to identify
the number of patients who require input from both mental health and
addictions.
Complete
Page 12
43

Page 44

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
Children and Young People
Improve the health and wellbeing of children, young people and families
Action Measures Comments/ Progress Status
Report on services and
supports provided to
young carers by
commissioned services.
Quarterly reports to Senior Management Team and a report
to Social Work Resources Committee on the support and
services provided by commissioned third sector
organisations.
Child and Family Services meet with the Young Carers Service for
regular monitoring meetings. In quarter 3, the number of young carers
supported with South Lanarkshire Young Carers Service (SLYCS) was
216, with 27 cases closed from previous quarter, and 26 new young
carers this quarter.
Action for Children (AfC) support young carers and their families
financially by signposted to dedicated Welfare Rights staff within South
Lanarkshire’s Money Matters. In quarter 3,  AfC staff applied for a
combined sum of £12,080 in funding from Lanarkshire Carers short
breaks bureau to support families.  AfC Young Carers Service also
accessed £8,750 from the new Action for Children Family Fund.
The Young Carers Service continue to work with Universal
Connections, Money Matters, Covey befriending, Healthy Valleys,
LCCC, NHS, CAMHS and KOOTH. Young Carers from SLYC were
also involved in the co-production of the UNCRC webinar film.
The contract for Carers Supports and Services (Young Carers) with
Action for Children has been reviewed and now extended, with a final
year’s extension to the existing arrangement due from 1 July 2025 until
30 June 2026.
Complete
Page 13
44

Page 45

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
Health and Wellbeing
Promote early intervention and prevention to achieve healthy, active lives and reduce inequalities
Action Measures Comments/ Progress Status
Deliver early intervention
support through the
locality Family Support
Hubs.
Strengthen GIRFEC Pathways across children’s services to
deliver early family support by group work, parenting support
and peer support. Strengthen the support pathway for
vulnerable unborn babies and their families.
Holistic family support continues to be delivered from four family
support hubs, reducing onward referrals to the locality teams. A
parenting support groupwork pathway has successfully been
implemented with key partners to ensure a coordinated approach to
supporting parents through evidence-based programmes and locally
developed engagement programmes routed in getting it right for every
child principles. There has been an increase in engagement from
fathers, both in the dads group and across other programmes.
Referrals being dealt with by the family support hubs remain
consistent, ensuring that family support is readily available to children
and their families when this is needed rather than at a point of crisis.
Each of the hubs have continued to deliver the full range of family
supports provision. The teams consist of social workers, family support
workers, peer support workers, group workers, therapists and Children
1st workers who provide families with a wide range of different family
support with the shared remit of preventing crisis, reducing inequalities
and improving child development, family function and wellbeing.
Green
Page 14
45

Page 46

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Wednesday 21 May 2025
Resource Plan actions and measures South Lanarkshire Council - Social Work
Delivering the plan and achieving best value
Digital and ICT services meet the needs of the council and its customers
Action Measures Comments/ Progress Status
Deliver the
implementation
programme to replace
the existing Social Work
IT system within
timescale
Implement the new Social Work IT system by October 2024. The project to implement the new social care information system
(Liquidlogic) is in the final stages of implementation.  Of the key project
milestones, inclusive of data migration, system configuration, system
integrations, testing and business readiness, the vast majority of
activity is now complete.  The remaining actions being concluded to
ensure the system can go live relate to one final piece of configuration
related to Self – Directed Support and Sourcing Care, final testing of
data being migrated and ensuring the service is trained and ready to
embrace the new system.  The focus of activity over the coming
months will be drawing these to a conclusion such that the system can
successfully go live.
Red
Health and Wellbeing
Help people to continue to live within their homes and communities through integrated community health and social care services
Action Measures Comments/ Progress Status
Maintain the delivery of
Care at Home support.
Retender for Care at Home services. New tender and
framework to be in place by 1 July 2024. Concluding
procurement process for care at home services to ensure
arrangements are in place.
27 Care at Home Providers continue to be appointed to the Procured
Services Arrangement. Phase 4 closed on 31 January 2025 and is
currently being evaluated.
Green
Page 15
46

Page 47

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 11 June 2025
Report by: Director, Health and Social Care  
Subject: Social Work Resource Plan 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 present the Social Work Resource Plan 2025/2026 for approval and note the
monitoring arrangements
[1purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the Resource Plan 2025/2026, attached as Appendix 1, be approved;
(2) that the Resource Plan 2025/2026 be uploaded onto the Council’s website
following consideration by the Committee; 
(3) that, following Committee approval, all Resource Plans be presented to the
Executive Committee on 25 June 2025 for noting; and
(4) that Progress Reports on the Resource Plan 2025/2026 be provided at
Quarter 2 and Quarter 4 to future meetings of the Committee. 
3. Background
3.1. The Resource Plans for 2025/2026 were prepared in line with the corporate
Resource Planning guidance. 
3.2. The Resource Plan is a key element of the Council’s performance management
arrangements.  It provides details of the context within which the Resource operates
and establishes actions and measures for the year ahead based on the priorities and
outcomes set out in the Council Plan Connect 2022 to 2027. 
3.3. Performance management is a keystone of Best Value and ensures that the Council
can demonstrate sound governance arrangements.  The Resource Plan is one part
of the Council’s framework for planning and budgeting and demonstrates how this
leads to effective front line service delivery. 
3.4. As part of this framework, the Resource Plan reflects the aspirations of the Council
Plan and the Community Plan as well as being complemented by the details of
individual Service, Business and other Plans.  Ultimately, these details are included
in the key work objectives of individual officers.  This demonstrates the ‘Golden
Thread’ of performance management which ensures a clear understanding of the
Council’s vision, values, priorities and outcomes at all levels. 
3.5. The current format for performance reporting has been established since 2007 and is
used for Executive Directors’ reports to the Chief Executive, Resource Management
Teams, Resource Committees and the Performance and Review Scrutiny Forum. 
The focus has been on reporting progress on Council outcomes, statutory
5
47

Page 48

performance indicators, other key performance measures and high level Resource
outcomes. Progress reports are provided at Quarter 2 and Quarter 4 to the
Committee. 
3.6. In preparing the Plan, account has also been taken of the need to ensure a robust
response to Risk Management and Control.  Risks associated with delivery of the
actions in this Resource Plan have been identified and evaluated and are listed in
the Resource Risk Register.  Where necessary, controls or further actions to mitigate
these risks have been agreed.  Such actions are tracked through the Resource Risk
Control Plan which is kept under review by the Risk Sponsor for the Resource. 
3.7. Following approval at individual Resource Committees, all Resource Plans will be
presented, as a pack, to the Executive Committee on 25 June 2025 for noting. 
4. Resource Plan 2025/2026
4.1. The Resource Plan 2025/2026 is attached as Appendix 1 and is structured around
the following headings:- 
1. Introduction 
2. Key areas for the year ahead 
3. Resource outcomes 
4. Measures and actions 
5. Resourcing the Plan 
4.2. Resource Outcomes 2025/2026
The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2025/2026.  To support these outcomes, the Resource has
developed performance measures in an action plan which is set out in section 4 of
the Resource Plan.  Key or strategic measures will be included in the Council Plan
Connect Progress Reports 2025/2026, with the rest being monitored and reported at
Resource level. 
4.3. Monitoring and reporting 
As part of the performance management arrangements, the Committee will receive a
mid-year update of progress on the measures in the Resource Plan covering the
period 1 April 2025 to 30 September 2025 (Quarter 2) as well as an end of year
progress report covering the full year 1 April 2025 to 31 March 2026 (Quarter 4). 
5. Employee Implications
5.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable and, in turn, the Performance Appraisal process for individual
employees. 
6. Financial Implications
6.1. The outcomes within the Resource Plan are reflected in the respective Resource
Revenue and Capital budgets and, longer term, within the framework of the Council’s
approved Financial Strategy. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change or environmental implications as a result of this report. 
7.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
48

Page 49

All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2025/2026. 
8. Other Implications
8.1. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Professor Soumen Sengupta
Director, Health and Social Care 
17 April 2025 
Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values, Priorities and
Outcomes in the Council Plan Connect 2022 to 2027 
Previous References
 None 
List of Background Papers
 Council Plan 2022 to 2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Liam Purdie, Head of Children and Justice Services and Chief Social Work Officer
E-mail:  Liam.Purdie@southlanarkshire.gov.uk 
49

Page 50

50

Page 51

Social Work Resources 
Social Work Resource Plan 2025-26 
Appendix 1
5
51

Page 52

Section Contents
1.0 Introduction
2.0 Key areas of focus for the year ahead
3.0 Resource outcomes
4.0 Measures and actions
5.0 Resourcing the Plan 
52

Page 53

Section One – Introduction 
I am pleased to introduce our Resource Plan for 2025-26 which sets out our intended outcomes
and priorities for the year ahead. This is the main annual business planning document for the
Resource, reflecting the Council’s key priorities as set out in the Council Plan and the directions
provided to the Council within the South Lanarkshire Integration Joint Board (IJB) Strategic
Commissioning Plan (SCP). 
The overall aim of Social Work Resources is to promote social welfare and provide effective care
and support to meet the needs of vulnerable people in South Lanarkshire. We are committed to
working with partners to provide responsive and accessible services that meet a range of defined
standards for service provision, and that support local people to maximise their potential, maintain
their independence and improve outcomes. We support and protect children, young people, adults,
older people, and their carers as well as adults involved with the justice system. 
There is a statutory requirement for the council to appoint a professionally qualified Chief Social
Work Officer (CSWO) who must be registered with the Scottish Social Services Council (SSSC).
The role of the CSWO is to provide professional advice and guidance to the local authority, South
Lanarkshire IJB, elected members, and officers in the provision of Social Work services, whether
commissioned or directly provided. A copy of the CSWO Report is available to download from the
Council website. 
Social Work Resources delivers services that are shaped by statutory duties set out in legislation
within a complex and changing environment. Population challenges, deprivation and health
burdens place greater demands upon existing resources, whilst the establishment of multi-agency
approaches support wider and agreed strategic objectives that are realistic and focused on the
safety and protection of our local communities. 
Service background
In terms of how the Resource is currently structured, there are three distinct areas of service as
outlined below:    
Children and Justice services support and care for children, young people, and their families so
that, wherever possible, young people can remain with their own families in their own communities.
The service takes an innovative approach to provide family support and promote the welfare and
development of children and young people, ensuring they have a voice and can participate in
decisions about their lives. Social Work Resources have a duty to protect children; whilst this is a
shared responsibility with other agencies and the community, Social Work has responsibility to
investigate allegations of child abuse. These responsibilities are carried out in the framework of
jointly agreed child protection procedures.  
Justice services work within the context of a South Lanarkshire Community Justice Partnership to
enable people to participate effectively in response to the problems and consequences of crime.
Services are offered in courts, local offices, and specialised teams to people referred by the courts,
prisons, and other agencies. A key aim of the partnership is to offer support to people in conflict
with the law to reduce their offending behaviour and promote community safety. This is done by
helping a person resettle following a period in prison, addressing responsibility for offending,
providing programs that offer realistic alternatives and raising awareness about how offending
affects victims. 
53

Page 54

South Lanarkshire University Health and Social Care Partnership (South Lanarkshire
University HSCP) supports the operational delivery of community-based health and social care
services for adults and older people on behalf of the South Lanarkshire IJB; which has
responsibility for the strategic direction of the delivery of health and social care for adults and older
people in South Lanarkshire. Staff deliver statutory services under a range of legislation including
the Social Care (Self-directed Support) (Scotland) Act 2013, Adult Support and Protection
(Scotland) Act 2007, Mental Health (Care and Treatment) (Scotland) Act 2003 and Adults with
Incapacity (Scotland) Act 2000. Identifying assessed needs and planning support to meet those
needs is undertaken collaboratively with adults, carers, and other partners, enabling people to
have choice and control over their care. The IJBs intermediate care approach provides reablement
and rehabilitation support both within the Blantyre Life Care Campus and at home with integrated
support from the Home Assessment Teams. 
Performance and Support Services
Performance and Support Services support the work of operational services within Social Work
Resources and the South Lanarkshire University HSCP through a range of administrative and
business support functions, including frontline operations; data processing; handling customer
enquiries; and supporting record management. A dedicated team provides services and support in
areas of consultation and engagement; information governance; complaints handling; regulation
and inspection; and risk management. The provision of management and performance information
supports statutory and local planning and performance, including the completion of Scottish
Government returns and statutory performance indicators as required by service needs.  
In developing and then taking forward this plan, we build on what we have achieved and what we
have experienced over recent years to ensure that we deliver services which are fit for purpose,
sustainable, and protect those at most risk and support those with the greatest needs across all
our communities. For all the adversity and uncertainty ahead, our ambitions are only matched by
the drive and commitment of staff across our services. We remain committed to innovating and
engaging with local communities, partners, and other stakeholders as we face the future together. 
Professor Soumen Sengupta
Director, Health and Social Care 
54

Page 55

Section Two – Key areas of focus for the year ahead  
2.0. Overview
The Resource has identified the main challenges, risks and new developments which will have
significant impact on the delivery of services in the coming year. These are outlined briefly
below.  
2.1. Challenges and service demand 
The Social Work (Scotland) Act 1968 places a duty on all local authorities to “promote social
welfare”. This legislative framework is both complex and ever changing and requires Social
Work Resources to manage and change service delivery in line with new requirements. 
Scottish policy in health and social care is guided by Scotland’s Health and Social Care
Standards, the embedding of human rights, the delivery of “The Promise” to children, young
people and families, and engagement in community justice planning. Within social work, the
vision requires a skilled and valued workforce with a focus on prevention, early intervention,
and enablement. 
Social Work Resources takes consideration of the risks in service delivery, planning, and
decision-making processes. Social Work managers provide strategic and operational
oversight of risks across all service areas and provide an update on the risks affecting Social
Work at each meeting of the Social Work Resources Committee. In the coming year Social
Work Resources will continue to take forward all necessary actions, where appropriate, to
mitigate or reduce the Resource’s exposure to these risks, in line with tolerance levels
defined within the Council’s Corporate Risk Management Strategy. 
The financial position within Social Work Resources continues to be challenging with a cost-of-
living crisis and increased morbidity with people living longer in poorer health. The Local
Government Benchmarking Framework (LGBF) National Benchmarking Overview Report 2023-
24 recognises the requirement for social care services to meet statutory obligations whilst
experiencing sustained demand and ongoing workforce challenges. 
Children and Families services has experienced budgetary pressures over recent years with
residual pressures within residential placements, fostering and kinship care. The service set
out its long-term intentions and budget recovery plan to Social Work Resources Committee
during 2024, making use of the Sustainability and Value Option Appraisal Screening Scale to
sustain financial balance in future years. Options and proposals designed to manage budget
pressures have been reported regularly to Committee throughout the year, with decisions
taken to establish Intensive Family Support Services and develop a joint project with
Barnardo’s to support young people transition to independent living. 
The IJB has a statutory obligation to set a balanced budget and as is the case across
Scotland, it continues to be faced with significant challenges in respect of the delivery of
social care services over the coming years. Based on the information available, the projected
funding gap over the three years from 2026-27 to 2028-29 is currently estimated to be £60
million, of which £29 million relates directly to adult and older people social care services.
The IJB continues to be committed to prioritising resources to protect services and supports
for the most vulnerable and at-risk throughout South Lanarkshire. 
The financial challenges are likely to be exacerbated by the overall population projection for
South Lanarkshire which is expected to increase by 2% from 319,020 in 2018 to 325,243 by
55

Page 56

2028 (Graph 1). This increase focuses largely on those aged over 65 to 74 and 75+ with an
expected rise of 20.8% and 25%, respectively. Conversely, the younger population is
reducing, putting further pressure on the potential labour market and an already challenged
workforce within social work and social care. With a decline in all younger age groups, with
exception of those aged 25 to 44 which is expected to increase by just 2%, the growing
demands from the older population are expected to impact directly on the future delivery of
Social Work services. 
Graph 1 
2.2. Regulation and inspection of services
The Care Inspectorate is the independent scrutiny and improvement organisation
responsible for regulating and inspecting care and support services for adults, children, and
criminal justice social work services. A number of different approaches are undertaken by the
Care Inspectorate including service specific inspections, thematic inspections, reviews, and
supported self-evaluations. 
A national thematic review of social work governance and assurance arrangements was
conducted across all local authorities and health and social care partnerships in Scotland
during 2024. The intention was to establish how well social work governance and assurance
arrangements support the delivery of safe and effective statutory duties and support the
accountability of staff whilst upholding social work values. The findings, published in March
2025, will be taken forward by the council and IJB. 
South Lanarkshire Justice Services volunteered to be part of the Care Inspectorate’s self-
evaluation process, trialling the new self-evaluation template in relation to performance
management, quality assurance and governance. The service was found to have
comprehensive governance arrangements in place and a strong culture of learning and
innovation, with leaders demonstrating an inclusive and participatory approach. The service
will take forward an implementation plan focussing on feedback. 
56

Page 57

2.3. Recruitment and retention 
In recent years, the Council has faced ongoing challenges in recruiting and retaining Social
Workers in a very competitive labour force market. In response, a modernisation programme
across social work services resulted in the addition of a senior practitioner role to secure and
establish capacity and resilience within the locality structure. Having recruited mainly from
within the organisation, the retention of an experienced workforce has been achieved whilst
developing a supportive management structure for social workers, including those newly
qualified. Care at Home staffing levels have also steadily improved following a period of
active recruitment. This has enabled the service to fully embed Home Assessment Teams
within each locality area. 
The next stage of service development and redesign for Children and Justice Services will be
focused on the transition and delivery of Self-directed Support for young people affected by
disability. Justice services is embarking on the implementation of a Justice Social Work
MAPPA team following a review of case load complexity in line with Social Work Scotland’s
Setting the Bar Review in 2022. The service will also improve capacity of supervisors within
the Unpaid Work Service in response to the number of new orders imposed by Scottish
Courts and Tribunal Services. 
2.4. Justice 
The South Lanarkshire Community Justice Partnership (CJP) supported early releases from
prison during summer 2024, following a range of emergency circumstances put in place in
response to the unmanageable population levels experienced by the Scottish Prison Service
(SPS). Key partners ensured all appropriate persons were provided with early intervention,
including screening for adult and child protection concerns, a housing interview and support
with accommodation. The Prisoners (Early Release) (Scotland) Bill, passed on 26 November
2024, will support a sustained reduction in the prison population in the immediate and longer-
term, resulting in further early releases during 2025. 
South Lanarkshire Justice Social Work Services are working with Social Work Scotland to
identify potential ways in which they can provide the Pan Lanarkshire Court Services with
additional opportunities to reduce the need to place people on remand and short-term
sentences. To date arrangements have been put in place to provide the Sheriff with verbal
standdown reports in respect of bail supervision and electronic monitoring. This will maximise
the number of cases where bail supervision could be considered within the daily court
schedule. 
The Children (Care and Justice) (Scotland) Act 2024 sets out to end the use of Young
Offenders Institutions for children (those under 18 years of age) in Scotland. A priority of
Justice services is to further develop provisions and pathways for young people (aged 16-21)
involved in conflict with the law, ensuring young people involved are not criminalised and are
provided with intensive and targeted support. 
In its commitment to the Lanarkshire Armed Forces Covenant, the Justice Social Work Unpaid
Work service has developed the Positive Futures initiative for Armed Forces veterans who enter
the Justice system.  The service supports veterans with challenges in relation to substance use,
employability, healthy living and mental health and signposts them to a range of specialist
veteran organisations for ongoing support. The Scottish Veterans Commissioner commended
the work of South Lanarkshire Council in the ‘Veterans and the Law’ report, published in
October 2024, describing the initiative as best practice for the ‘life changing’ impact described
by veterans involved in the initiative. 
57

Page 58

2.5. Children, young people, and families 
Scotland’s promise to children and young people with experience of care that they will grow
up loved, safe and respected is taken forward by The Promise Plan 2024/2030. The national
plan was launched in June 2024 and provides a route map on the collaborative working that
must continue to fulfil The Promise by 2030. Plans are in place locally to grow the
membership of care experienced Champions in the coming year, focusing on the recruitment
of younger Champions to ensure all views and opinions are represented. 
A tender for £1.2 million over a 3-year period to provide an Intensive Family Support Service
started in February 2025. An approved provider will be commissioned to work with identified
children in high-cost residential care. The costs would be funded from the anticipated annual
savings from a reduction in placements, with the overall aim to support children and young
people either within their family home or through alternative community options. 
Focussing on the whole family approach, parents and carers are working collaboratively in
the development of the Family Support Hubs. Feedback is encouraged through Care Opinion
and at specific consultation events for all family members including children and young
people. Recognising their achievements to date, the Family Support Hubs were selected as
finalists in the category “Care for Mental Health Award” at the Scottish Health Awards 2024.
An area of further development will be to introduce an evidence-based training and resource
programme which will focus on emotional health and wellbeing for all children, their parents,
and carers. 
South Lanarkshire Children and Families Services and Housing Services, in partnership with
Barnardo’s, successfully received a grant from the Big Lottery fund to provide a number of
young people with long term accommodation and housing support. Currently supported by
the Throughcare and Aftercare team, the young people will be supported by Barnardo’s staff,
the Council’s Throughcare Housing Officer and offered employability support to develop the
skills and confidence to enable them to live an independent lifestyle before fully preparing for
independent living. The partnership work of the project was recognised when reaching the
final stages of the Scottish Housing Awards 2024. 
The Child Friendly Complaints Handling principles and guidance were publicly launched in
July 2024 by the Scottish Public Service Ombudsman. The guidance outlines the new
approach for public bodies to involve children and young people in complaints that may affect
them and ensure the rights of the child under the United Nations Convention on the Rights of
the Child (UNCRC) are met throughout the complaints process. 
2.6  South Lanarkshire University Health and Social Care Partnership
Delivering the Strategic Commissioning Plan (SCP) intentions issued by the IJB are a priority
for Social Work Resources. The SCP 2025-28 was approved by the IJB in March 2025. The
Plan sets out a vision for integrated, person-centred health and social care and focuses on
five strategic goals:  
• Nurture 
• Access 
• Flow 
• Recovery 
• Protect 
South Lanarkshire University HSCP is actively engaged with partners to reduce the number
of delayed discharge episodes within hospitals through the ongoing implementation of an
Optimal Discharge Planning Target Operating Model. The creation of a “community beat” has
58

Page 59

improved the appropriateness of social work referrals within hospital settings and is providing
a better indication of the number of social work referrals that community teams can process. 
Collaborative working across the South Lanarkshire Alcohol and Drug Partnership (ADP) has
made significant progress in response to the rise in drug related deaths across Scotland. The
Medication Assisted Treatment Standards (MAT) are embedded across South Lanarkshire
and include trauma training for staff and the commissioning of an advocacy service. 
Digital technology is evident across new developments in residential care services and
empowering individuals to live independently within the community. The Glasgow Region 5G
Innovation Fund has awarded eleven innovative approaches to use digital and data enabled
smart technology to improve social connections within communities across Scotland. A
successful bid for a time limited project to introduce a Smart TV messaging service within a
South Lanarkshire care home has enabled residents to engage in direct contact with care
home staff, family and friends via calls, text messages and video links through their Smart
TV. Options to expand within other care homes will be explored. Meanwhile, the transition to
the national Digital Alarm Receiving Centre (ARC) and the launch of phases 2 and 3 of the
Amazon Healthcare Project in 2025, will allow people living within their own home to voice-
activate their community alarm service to call the ARC, connect with their support networks
via video, and participate in daily wellbeing checks, thus reducing risks and enhancing choice
and control through innovative technology. 
South Lanarkshire University HSCP is committed to delivering the legislative requirements in
relation to the Carers (Scotland) Act 2016. Lanarkshire Carers is the commissioned service
supporting adult carers in South Lanarkshire, whilst Action for Children support young carers.
The planned recommissioning of carer support within South Lanarkshire for both young
people and adults will progress during 2025. 
Care Opinion provides a platform for service users to share feedback on their health and
social care experiences. It has become a vital part of South Lanarkshire University HSCP,
helping to evaluate services, support staff morale, and design improvements based on real
experiences. The platform enhances our understanding of people's experiences with health
and care services, ensuring that as we continue to promote its use, we remain responsive to
those who engage with us. This alignment with our values supports safe, effective care
delivery across South Lanarkshire. The impact of Care Opinion is reflected in its success
with statistics showing that, in its early stages, the South Lanarkshire University HSCP has
far exceeded the national average with record levels of engagement. 
2.7  Cost of Living
The UK is experiencing the worst cost-of-living crisis in 40 years. While all sectors of society
are seeing prices rise, the impacts are greatest for those on the lowest incomes. The council
recognises the immense pressures being faced by households across South Lanarkshire
and acknowledges the additional demands on council services as a result. The council has in
place a range of support which can help households manage scarce resources and services
will continue to explore all avenues to support the most vulnerable in the year ahead. 
2.8  Social Work IT System Replacement 
The replacement of the Social Work case management IT System is underway. To date
significant progress has been made and a fully comprehensive familiarisation and training
plan will be put in place to support business change processes for implementation. 
59

Page 60

2.9  National Social Care Reform 
The 2021 findings and recommendations of The Independent Review of Adult Social Care in
Scotland (IRASC) prompted COSLA and the Scottish Government to set out their intentions
to work together to reform the social care system and enhance the rights for people
accessing care support. A non-statutory National Care Service advisory board will be
established with forthcoming amendments to the Bill to remove the requirement to legislate
for structural reform in order to achieve the outcomes of the review. 
2.10 Sustainable Development and Climate Change
The council acknowledges the serious and immediate threat of climate change and is
committed to accelerating the pace of action in response to the climate emergency and in
Scotland’s transition to a net-zero and climate resilient society and economy. It is expected
that, as a public body, the council leads by example and uses its role to influence area-wide
climate change action and sustainability. The Sustainable Development and Climate Change
Strategy (2022-27) sets out how the council aims to develop sustainably and tackle climate
change. 
60

Page 61

Section Three – Resource outcomes 
3.1 Resource outcomes
Social Work Resources has established the following Resource outcomes to support the
delivery of Connect outcomes in 2025-26.  
Connect Outcomes Resource Outcomes
Communities and
Environment  
• Social Work Resources embeds sustainable
development across services 
Education and Learning No Resource Outcomes for this Connect Outcome
Health and Wellbeing • Care and protect children, young people, and adults
from risk of harm 
• Provide assurance on the quality of registered care
services
• For those who have committed offences, safely and
effectively support them to reintegrate into the
community and realise their potential for the benefits
of all 
• Help people to continue to live within their homes
and communities through integrated community
health and social care services
• Promote early intervention and prevention to achieve
healthy, active lives and reduce inequalities 
Children and Young
People
• Improve the health and wellbeing of children, young
people, and families 
Housing and Land No Resource Outcomes for this Connect Outcome
Our Economy No Resource Outcomes for this Connect Outcome 
3.2. Delivering the Plan and achieving Best Value
In working towards the six outcomes, the council aims to continually improve and ensure
effective and efficient use of resources, and our business will be conducted with integrity,
transparency and will operate to the highest standards. 
Social Work Resources has established the following Resource Outcomes to support
Delivering the Plan and achieving Best Value. 
Delivering the Plan and
achieving Best Value
Resource Outcomes
• Digital and ICT services meet the needs of the
council and its customers 
61

Page 62

Section Four – Measures and actions 
4.0  Performance measures and action plan 
This section of the Resource Plan is divided into two parts: part (a) sets out our main  
performance measures against our outcomes; and part (b) describes the key actions we will
take in the coming year to respond to the challenges ahead and improve services and
outcomes.  
4.a. How we will measure our performance
The impact of Covid-19 and the current recruitment challenges continue to have an effect on
performance for some services. The table below shows our performance measures, with the
actual data last reported to Committee and the target for the last financial year and 2025-26.
Additional context for the results/targets is provided within the note’s column, where applicable. 
Resource Outcome: Social Work Resources embeds sustainable development across services   
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
1. Evidence the use
of recycled stock
as a percentage
of all Equipu
activity
£155,580 10% 10% C01.06 Adult
and
Older
No change
from 24/25 
2. Recycle and
reuse community
alarms per month 
n/a n/a 60 01.06 Adult
and
Older
New measure
for 25/26 
Resource Outcome: Care and protect children, young people, and adults from risk of harm 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
3. Percentage of
parental
attendance at
initial Child
Protection
Planning
meetings
89% 85% 85% 04.05 Children
and
Justice
No change
from 24/25
4. Percentage of
children seen by
a supervising
officer within 15
days
57% 75% 75% 03.04 Children
and
Justice
No change
from 24/25
National target
75%
5. Percentage of
reports submitted
to the Children’s
Reporter within
agreed
timescales
53% 75% 75% C03.04 Children
and
Justice
No change
from 24/25
National
Target 75%
6. Percentage of
care experienced
children and
young people
10% 10% 10% C04.08 Children
and
Justice
No change
from 24/25
National target
10%
62

Page 63

Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
accommodated
in residential
placements
7. Percentage of
statutory
supervising
officer visits
completed within
timescale for
local authority
welfare
guardianship
orders
94% 75% 75% C03.04 Adult
and
Older
People
No change
from 24/25
8. Percentage of
statutory
supervising
officer visits
completed within
timescale for
private welfare
guardianship
orders
92% 75% 75% C03.04 Adult
and
Older
People
No change
from 24/25 
Resource Outcome: Provide assurance on the quality of registered care services 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
9. Percentage of
internal care
services graded
'good' or better in
Care
Inspectorate
inspections
n/a n/a 75% 07.10 Children
and
Justice
and
Adult
and
Older
People
New measure
for 25/26 
Resource Outcome: For those who have committed offences, safely and effectively support
them to reintegrate into the community and realise their potential for the benefits of all 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
10. Percentage of
people on CPO
unpaid work
requirement
seen within five
working days by
their case
manager
72% 75% 75% 03.02 Children
and
Justice
No change
from 24/25
National target
75% 
11. Percentage of
people starting
their
placements
within seven
70% 75% 75% 03.02 Children
and
Justice
No change
from 24/25
National target
75% 
63

Page 64

Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
days of a CPO
unpaid work
sentence
12. Percentage of
Justice Social
Work reports
submitted to
Court by due
date
98% 95% 95% C03.02 Children
and
Justice
No change
from 24/25
National target
95% 
Resource Outcome: Help people to continue to live within their homes and communities
through integrated community health and social care services 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
13. Percentage
of care at
home hours
reduced
through
Home
Assessment
intervention
n/a 30% 30% 03.01 Adult
and
Older
No change from
24/25 
14. Percentage
of people on
a Drug
Treatment
and Testing
Order
(DTTO) seen
within 2 days
n/a n/a 95% 03.06 Adult
and
Older
New measure
for 25/26
15. Number of
people
participating
in a co-
produced
SDS
Assessment
to exercise
choice and
control over
their care.
3,459 3,000 3,000 03.05 Adult
and
Older
People
No change from
24/25 
Resource Outcome: Improve the health and wellbeing of children, young people, and families 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
16.Reduce the
number of
babies living
away from
their families
n/a n/a 10% 04.04 Children
and
Justice
New measure
for 25/26
Demonstrate
the impact of
the Family
Support Hubs  
64

Page 65

4.b What actions will we take in 2025-26 
Resource Outcome: Care and protect children, young people, and adults from risk of harm 
Action Milestones/Steps we will take
to deliver our actions
Links Service
1.  Provide strategic leadership
and oversight of the delivery of
public protection services and
improved outcomes for
children, young people, and
adults 
Hold quarterly meetings of the
Chief Officer’s Group (Public
Protection) to monitor,
scrutinise and evaluate public
protection activity including
performance, Learning
Reviews, audit, and evaluation
outcomes 
03.04 Children and
Justice and
Adult and Older
People
New measure
for 25/26 
Resource Outcome: Provide assurance on the quality of registered care services 
Action Milestones/Steps we will take
to deliver our actions
Links Service
2.  Consult and engage with
service users, carers, other
providers, and community
forums in the process of self-
evaluation of delivered care
services
Evaluate Care Opinion activity
across services biannually 
03.02 Performance
and Support
Services
New measure
for 25/26 
Resource Outcome: For those who have committed offences, safely and effectively support
them to reintegrate into the community and realise their potential for the benefits of all 
Action Milestones/Steps we will take
to deliver our actions
Links Service
3.  Contribute to a reduction of
the national prison
population supporting
individuals on release
Evaluate the impact of the work
of the Community Justice
Partnership, reporting to Social
Work Committee by December
2025. 
03.02 Children and
Justice
New measure
for 25/26 
Resource Outcome: Help people to continue to live within their homes and communities
through integrated community health and social care services 
Action Milestones/Steps we will take
to deliver our actions
Links Service
4.  Commission independent
services to ensure
information, advice and
support is available for
people who provide care
Tender of commissioned carers
services to be completed by
March 2026 
03.04 Adult and Older
People
New measure
for 25/26 
65

Page 66

Resource Outcome: Promote early intervention and prevention to achieve healthy, active lives
and reduce inequalities 
Action Milestones/Steps we will take to
deliver our actions
Links Service
5.  Launch phases 2 and 3 of
the Amazon Healthcare
Project 
Project evaluation to be
completed by March 2026
03.06 Children and
Justice
New measure
for 25/26 
6.  Evaluate the potential to
expand the Smart TV
messaging service within
residential services 
Project evaluation to be
completed by September 2025
03.02 Adult and
Older People
New measure
for 25/26 
Resource Outcome: Improve the health and wellbeing of children, young people, and families 
Action Milestones/Steps we will take to
deliver our actions
Links Service
7.  Engage families in receiving
whole family support 
Demonstrate the impact of the
Family Support Hubs within an
annual report by March 2026
03.06 Children and
Justice
New measure
for 25/26 
Resource Outcome: Digital and ICT services meet the needs of the council and its customers 
Action Milestones/Steps we will take to
deliver our actions
Links Service
8.  Deliver the implementation
programme to replace the
existing Social Work IT
system within timescale
Develop a fully comprehensive
familiarisation and training plan to
support business change
processes for implementation
07.04 Performance
and Support 
66

Page 67

Section Five – Resourcing the plan 
5.0. Introduction 
In this section we consider the resources needed to implement our plan, including funding
and staffing. 
5.1. Revenue budget 2025-26
The Resource has a Net Revenue Budget of £246.046 million. The table below allocates
this budget across the services:  
Net budget by service  £ million %
Performance and Support Services 5.974 17.0
Adult and Older People 197.490 80.3
Children and Families 41.846 2.4
Justice and Substance Misuse 0.736 0.3
Total 246.046 100 
5.2. Capital budget 2025-26 
The following capital budget of £0.416 million is allocated: 
Capital Programme  £ million
Implementation of new IT Social Work Case
Management System  0.416
Total 0.416 
5.3. Resource employees 
Social Work Resources has 2822 employees as of February 2025. We support these
employees to deliver their duties through a range of policies including personal appraisal
and a robust training framework. 
The number of employees (per headcount) by service is as follows: 
Service Number of employees
Adult and Older Peoples Services 2039
Children and Justice Services 535
Performance and Support 247
Total 2821 
If you need this information in another language or format, please contact us to discuss how we
can best meet your needs. Phone 0303 123 1015 or email equalities@southlanarkshire.gov.uk
67

Page 68

68

Page 69

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)
Director, Health and Social Care 
Subject: Strengthening Justice Services Capacity 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the confirmed Section 27 Grant for Justice Social Work
Services funding allocation for South Lanarkshire, and proposals for strengthening
local service capacity
e]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the update in relation to confirmed Section 27 (S27) grant funding for
2025/2026, and proposals for local investment, be noted; and
(2) that it be approved that the additional posts, as detailed in section 5, be added
to the Social Work Resources’ establishment.
[1recs]
3. Background
3.1. Funding allocation for Justice Social Work Services was included in the Scottish
Government’s draft budget for 2025/2026, which was approved by the Scottish
Parliament on 25 February 2025. 
3.2. The budget includes additional investment of £5 million in justice social work and £15
million of continued funding which was provided to support COVID-19 recovery efforts
and bail services, which will now be baselined and reoccurring for future years to help
build capacity in Justice Social Work Services. 
3.3 A total of £3.1 million nationally will also be repurposed. This includes £1.5 million of
funding which is linked to the decommissioning of a justice social work third sector
legacy service and £1.6 million of funding from the bail supervision and structured
deferred sentences incentivisation schemes, which end on 31 March 2025. The new
investment and the baselining of £15 million builds on the £11.4 million of new
investment provided in 2024/2025.   
3.4. This allocation includes a share of £2.5 million of investment to support the
commissioning of third sector justice services in line with previous years. It will be for
the local authority areas working with justice partners and third sector to target this
funding in collaboration. The allocation of funding includes financial provision for the
Caledonian Women and Children’s Service Equality Programme and the Caledonian
Women and Children’s Service Violence Against Women and Girls Programme. 
6
69

Page 70

3.5. Part 1 of the S27 Grant for Justice Social Work Services (flexible grant element) has
included new investment for additional capacity of Justice Social Work Services in line
with the National Strategy for Community Justice. 
3.6. South Lanarkshire Council have received an additional S27 grant funding to support
increased workload and development of justice services of which £0.555 million is
available for investment. 
4. Areas for Investment 
Community Payback and Unpaid Work Requirements 
4.1. The March 2025 Committee paper Justice Services Unpaid Work Service - Update
referenced increased workload challenges coupled with an outstanding backlog of
hours along with a significant increase in new orders being made. 
4.2. Through forecasting the potential increase in outstanding Unpaid Work hours over the
next 5 years, it is estimated that these will increase by 57%. As such, it is proposed to
allocate additional funding to the unpaid work supervisor role as outlined in section 5
of this report. In addition, £0.035 million would be allocated to support increasing
Personal Protection Equipment, materials and fleet costs for 2025/2026. 
Moving Forward 2 Change (MF2C)
4.4. The Moving Forward 2 Change (MF2C – formerly Moving Forward: Making Change)
programme provides one-to-one and group work to help people convicted of sexual
offences address the underlying cause of their behaviour to prevent further offending. 
Data analysis informs that over the last 3 years there has been a 50% increase in
Community Payback Orders with this programme’s requirements. Given this,
alongside the reduction of custodial sentences for those that do not pose an imminent
risk of sexual harm, an increase in statutory orders with MF2C requirements is likely. 
4.5. As such, it is proposed to allocate additional funding to qualified social work posts to
enhance undertake case management and group work capacity as outlined in section
5 of this report. 
National Strategy for Community Justice  
4.6. The local reporting requirements for the national strategy require a significant level of
information from operational justice services, analysis and co-ordination of data. In
addition, there is a greater level of demand on Justice Services with respect to General
Data Protection Requirements; and also contract procurement processing. 
4.7. As such it is proposed to allocate additional funding to team leader capacity to
undertake and develop Community Justice reporting, procurement activity and data
protection requirements in justice social work services as outlined in section 5 of this
report. 
4.8. The post requires to be set at team leader grade due to it holding line management
responsibilities for the Community Justice Co-ordinator post. In addition the role will
have lead responsibilities for performance management and quality assurance
framework development in Justice. 
Recovery Orientated Justice Service
4.9. In June 2023 the Committee approved the recommendations within the Reducing Drug
Deaths: The South Lanarkshire Alcohol and Drug Problem Solving Court Report,
including the use of fixed term funding from The Corra Foundation for 0.5 team leader
70

Page 71

and 2 FTE qualified social workers as part of the local Recovery Oriented Justice
Service (ROJS). The Corra Foundation funding concludes in September 2025. 
4.10. Analysis of the Alcohol and Drug Problem Solving Court and the work of the ROJS
indicates that this innovative public health approach to justice services approach is
yielding positive results for service users. A separate report is being presented to this
(June 2025) meeting of the Committee recommending continuation of the service with
a proposal to utilise S27 monies to make the posts referred to at 4.9. permanent. 
5. Employee Implications
5.1. It is proposed that the following posts should be added to the Social Work Resources’
establishment on a permanent basis:- 
Post No of
posts
Grade SCP
range
Hourly
rate
Annual
salary
Gross
Cost inc
on costs
29.7%
Total
cost
Placement
Supervisor 
3 G2 L3
Plus 1 
46-48  £17.51-
£17.98 
£31,954-
£32,812 
£41,444 -
£42,557
£124,333-
£127,670
Social Worker  3 G3 L4  72-74  £24.24-
£24.76 
£44,236-
£45,185 
£57,374 -
£58,604
£172,121
-
£175,813
Team Leader
(Operational
Development)
1 G3 L8  79-80  £26.67-
£27.07 
£48,670-
£49,400 
£63,125 -
£64,072
£63,125-
£64,072
Total        £359,579-
£367,555 
6. Financial Implications
6.1. The total cost of the staffing proposals at 5.1 is £0.367 million.  In addition, a further
£0.035 million will be invested in the unpaid work service as outlined at 4.2.  The overall
cost will be funded from the additional S27 funding received for 2025/2026 (as per
3.6). 
6.2 As per 4.10, a separate report is being presented to this (June 2025) meeting of the
Committee recommending continuation of the South Lanarkshire Alcohol and Drug
Problem Solving Court with a proposal to utilise £0.149 million of S27 monies to make
the associated and currently fixed-term posts permanent. 
6.3 The total cost of the proposals is £0.551 million and will be funded from the additional
monies from the S27 budget. 
7. Climate Change, Sustainability and Environmental Implications
7.1.  There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The proposals described within this report will help mitigate the following risk within
the Social Work Resources Risk Register:- 
 Meeting Public Protection and Legislative Duties – high.  
71

Page 72

9. Integrated Impact Assessment and Consultation Requirements
9.1 This report does not introduce a new policy, function or strategy and, therefore, no
impact assessment is required. 
Professor Soumen Sengupta
Director, Health and Social Care 
21 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 focused on people and their needs
 working with and respecting others
 accountable, effective, efficient, and transparent
 ambitious, self-aware and improving 
Previous References
 Social Work Resources Committee - Justice Services Unpaid Work Service - Update -
26 March 2025 
List of Background Papers
 National Strategy for Community Justice 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Gillian Booth - Service Manager Children and Justice Social Work 
Tel: 07725886299
E-mail:  gillian.booth@southlanarkshire.gov.uk   
72

Page 73

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 11 June 2025
Report by: Executive Director (Finance and Corporate Resources)
Director, Health and Social Care 
Subject: Investing in Recovery Oriented Justice Services 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the impact of the South Lanarkshire Alcohol and Drug
Problem Solving Court and Recovery Oriented Justice Service
e]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the continuation of the South Lanarkshire Alcohol and Drug Problem
Solving Court be supported;
(2) that the Recovery Oriented Justice Service becoming an ongoing part of South
Lanarkshire Justice Social Work Services be supported; and
(3) that the specified fixed term posts be made permanent within the Social Work
Resources’ establishment, as detailed in section 5 of this report. 
[1recs]
3. Background
3.1. Problem-solving justice is an umbrella term given to court-based approaches tackling
problematic social, health and lifestyle issues linked to repeated patterns of offending. 
3.2. In June 2023 the Committee approved the initiation of an innovative project to pilot an
Alcohol and Drug Problem Solving Court in South Lanarkshire. This was to be the first
in Scotland to directly support dual substance use, with interventions delivered in
South Lanarkshire by the Recovery Oriented Justice Service (ROJS) team. 
3.3. Developed with the support of the Sheriff Principal, the South Lanarkshire Alcohol and
Drug Problem Solving Court has been designed to promote a public health approach
to those in conflict with the law whose offending is related to their substance use and
to protecting the public. This includes supporting people into recovery services. 
3.4. The South Lanarkshire Alcohol and Drug Problem Solving Court became operational
in Hamilton in December 2023, the criteria for inclusion being individuals:- 
 aged between 25 and 55 years old
 having previously been subject to a Community Payback Order/custody/diversion
from prosecution or at risk of custody
 having a drug use dependency or regular use that contributes to offending (this
can include alcohol) 
7
73

Page 74

 being motivated to voluntarily engage with a structured deferred sentence for
between 6 and 9 months, and to undertake an appropriate treatment plan 
3.5. The pilot was resourced using a combination of funding from the Section 27 (S27)
Grant for Justice Social Work Services and The Corra Foundation (following a
successful application via the Scottish Government Drug Task Force) as well as
additional resource made available through the Alcohol and Drug Partnership (ADP)
for integrated nursing and peer mentor support within the ROJS team.   
3.6. Having considered the data analysed of the reception to and impact of the pilot to-
date, and given the additional S27 grant funding now confirmed for the council (as
separately reported to this meeting of the Committee), a recommendation is now being
proposed to convert the pilot project to an on-going part of the South Lanarkshire
Justice Social Work Services in partnership with Hamilton Sheriff Court. 
4. Alcohol and Drug Problem Solving Court – Analysis of Impact To-date
4.1. The ROJS is a multidisciplinary team made up of a team leader, two qualified social
workers, one specialised addictions nurse and two peer mentors from the community
justice organisation SACRO. 
4.2. The ROJS assesses cases for suitability for the Alcohol and Drug Problem Solving
Court. If an individual is assessed as suitable for the Alcohol and Drug Problem Solving
Court their case is transferred from general Court business to the dedicated Court,
with their being dedicated Alcohol and Drug Problem Solving Court Sheriffs
overseeing the person’s progression. 
4.3. The ROJS team provide support direct from the Court, with Social Workers attending
all Alcohol and Drug Problem Solving Court reviews and offering support for the
person to attend. Individuals subject to structured deferred sentences receive rapid
access to treatment and support services, with health needs prioritised. Individual
action plans that incorporate choice and a rights-based approach to best meeting
identified needs are created in conjunction with the individual and their family or loved
ones. 
4.4. Importantly transition planning is an integral feature of the process, with those who
engage supported to have a positive exit from the Justice system with continued
supports in the community. The ROJS team engage heavily with third sector
organisations to encourage those on the order to engage with their local recovery
communities and wider support networks to assist with their recovery journey. 
4.5. Independent analysis of the pilot to-date has provided evidence that indicates that this
public health approach to justice services is yielding positive results. 
4.6. Analysis of quantitative data has found that offending and substance use decreased
for most individuals since being placed on a structured deferred sentence, with over
95% of those: 
 On a structured deferred sentence who use substances having been provided
pathways into either wider employment, housing, and some form of health and
welfare opportunities.
 On a structured deferred sentence disposal sustaining or had completed their
period of support.
74

Page 75

 Receiving medically assisted treatment and/or recovery plans in conjunction with
access to community-oriented recovery networks.
 Of service user families with lived experience having been provided with advice
and support in the recovery journey. 
4.7. Qualitative data from those with lived experiences and their families has further
illuminated the nature of the improvements in the lives of those who have engaged.   
“I’m a different person since this happened. I’ve got a new perspective on life, better
values, better goals. I want to move forward … I feel like I’ve turned everything
around.” 
“My experiences with sheriffs were ‘yes, sir’ but this guy would talk to you, like ‘how
are you feeling?’, ‘do you recognise this was wrong?’– it never felt like a judge, but
someone who was caring, someone who was actually interested … a lot of positivity
off the judge, and a lot of support from this team.” 
“The workers are all saying they’d like me to go on and be a mentor or something
because I’ve had addictions for that long and I’m still here and I could give out good
advice. It would be good to mentor people, to guide them and say, ‘this is my
experience’ … save their life maybe … because I’m still here and I should [not] be.” 
“I don't know where to begin with thanking you.  [SACRO] have been the driving force
behind [my family members change] since you [worked with] him. We all appreciate
what you do for people in need!” 
4.8. The pilot project and the work of the ROJS staff has also been strongly supported by
and positively commented upon by the Court Sheriff and staff. 
“The ROJS staff really do go above and beyond. The level of effort and commitment
is commendable. I think we even see this with the service users in the court room, with
members of the ROJS team … social work give practical support, and this can be
taking the person to hospital, helping with housing forms, and even encouragement
from day to day with peer mentors. It is the best example of an analytic approach.” 
4.9. The project has also received national interest and recognition, notably winning the
prestigious Integrated Care Award at the 2024 Scottish Health Awards.   
4.10. With the impending expiration of The Corra Foundation funding (September 2025) and
in order then to continue the Alcohol and Drug Problem Solving Court, it is proposed
to allocate the additional S27 funding that has now been confirmed to make the team
leader and the two qualified social workers posts within ROJS permanent. 
4.11. The independent analysis of the impact of the Alcohol and Drug Problem Solving Court
is continuing so as to both contribute to national learning and, subject to the approval
of the recommendations here, inform the further development of the local service.   
5.  Employee Implications
5.1. It is proposed that the following posts should be added to the Social Work Resource
establishment on a permanent basis:-  
75

Page 76

Post No of
posts
Grade SCP
range
Hourly
rate
Annual
salary
Gross
Cost inc on
costs 29.7%
Total
cost
Team
Leader
(ROJS)
0.5 G3 L8  79-80  £26.67-
£27.07 
£48,670-
£49,400 
£63,125 -
£64,072 
£31,563-
£32,036 
Social
Worker
(ROJS)
2 G3 L4  72-74  £24.24-
£24.76 
£44,236-
£45,185 
£57,374 -
£58,604
£114,747-
£117,209 
Total        £146,310-
£149,245 
6. Financial Implications
6.1. As separately reported to Committee, Part 1 of the S27 Grant for Justice Social Work
Services (flexible grant element) has included new investment for additional capacity
of Justice Social Work services in line with the National Strategy for Community
Justice. South Lanarkshire Council have received additional S27 grant funding to
support increased workload and development of justice services. 
6.2. The total cost of the staffing proposals at 5.1 is £0.149 million, to be funded from the
additional £0.555 million S27 funding available for investment in 2025/2026. 
7. Climate Change, Sustainability and Environmental Implications
7.1.  There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The proposals described within this report will help mitigate the following risk within
the Social Work Resources Risk Register: - 
 Meeting Public Protection and Legislative Duties – high. 
8.2. It is recognised that the Scottish Courts and Tribunals Service may require to respond
to necessary court scheduling requirements dependant of business priorities. In the
event of any change to the current operating model justice social work services will
ensure a public health approach ethos continues within the service and current
resources are directed appropriately 
9. Integrated Impact Assessment and Consultation Requirements
9.1 This report does not introduce a new policy, function or strategy, and therefore no
impact assessment is required. 
Professor Soumen Sengupta
Director, Health and Social Care 
21 May 2025 
76

Page 77

Link(s) to Council Values/Priorities/Outcomes
 focused on people and their needs
 working with and respecting others
 accountable, effective, efficient, and transparent
 ambitious, self-aware and improving 
Previous References
 Social Work Resources Committee - Reducing Drug Deaths: The South Lanarkshire
Alcohol and Drug Problem Solving Court - 28 June 2023 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Gillian Booth - Service Manager Children and Justice Social Work 
Tel: 07725886299
E-mail:  gillian.booth@southlanarkshire.gov.uk   
77

Page 78

78

Page 79

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 11 June 2025
Report by: Director, Health and Social Care    
Subject:                   Winter Planning 2024/2025 Debrief 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose] 
 provide a debrief of the winter preparedness arrangements for the Lanarkshire
health and social care system for 2024/2025 and highlight learning for
subsequent years with reference to anticipated revised national guidance
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the contents of the report be noted. 
3. Background
3.1. Planning for Winter 2024/2025 commenced in August 2024 and, as in previous years,
was undertaken in accordance with national guidance.  The Lanarkshire approach to
winter planning is a multi-agency approach across NHS Lanarkshire (NHSL), North
and South Lanarkshire Integration Joint Boards (IJBs) and both councils together
with the respective supports (for example, the Scottish Ambulance Service (SAS)
and NHS 24. 
3.2. National guidance was published on 24 September 2024 which set out the national
expectations for those areas that local winter plans would be expected to address. 
The 4 winter planning priorities outlined follow a journey through the health and social
care system:- 
 Priority One: Prioritise care for all people in our communities, enabling people to
live well with the support they choose and utilise effective prevention to keep
people well, avoiding them needing hospital care.
 Priority Two: Ensure people receive the right care, in the right place at the right
time, this includes prioritising care at home, or as close to home as possible,
where clinically appropriate.
 Priority Three: Maximise capacity and capability to meet demand and maintain
integrated health, social care and social work services, protecting planned and
established care, to reduce long waits and unmet need.
 Priority Four: Focus on supporting the wellbeing of our health and social care
workforce, their capacity and improving retention, as well as valuing and
supporting Scotland’s unpaid carers. 
3.3. The Lanarkshire winter plan for 2024/2025 developed by a multi-agency group
including representatives NHSL, both Health and Social Care Partnerships (HSCPs)
and councils, SAS and wider partners. Alongside being submitted to the Scottish
8
79

Page 80

Government by their due timescales, the winter plan was shared widely across the
key partners and presented to key governance groups. 
3.4. The winter plan was presented to this Committee at its meeting of 29 January 2025. 
3.5. Through the winter period data available to support system monitoring and, where
appropriate, opportunities for improvement were utilised daily in overseeing system
pressures and where to prioritise input to support improved patient flow. This data
also provided early warning of potential difficulties in relation to system flow at all
levels across the NHSL and both HSCPs. The Public Health Scotland/National
Services Scotland (NSS) real time dashboards for winter planning and Social Work
Services were also available to assess performance and any emerging issues. 
3.6. In per best practice and previous practice, the subsequent debrief of the Lanarkshire
winter planning was undertaken in March 2025 and involved representatives from the
partners who had contributed to its development (see 3.3). 
4. Winter Preparedness Debrief
4.1. The Lanarkshire winter plan was structured in 2 main parts:- 
4.1.1. The first element recognised the significant work undertaken as part of Operation
Flow to maximise flow through acute hospitals and associated care pathways. The
key objective for Operation Flow was and remains that patient safety is enhanced
and staff wellbeing improved through a reduction in hospital occupancy and
maintaining sustained improvement across all key performance metrics by:- 
 managing demand across the system
 maintaining a positive admission and discharge balance
 maximising outflow. 
4.1.2. A separate and detailed report on this has been presented to the NHSL Board at its
January 2025 meeting and is accessible here:- 
Urgent and Unscheduled Care Festive Period and Actions Going Forward 
4.1.3. All other aspects of the Lanarkshire-wide winter plan – including the input of the Flow
Navigation Centre Plus (FNC+) - were undertaken via the multi-sectorial and multi-
agency winter planning group (see 3.6). This debrief report focuses on those aspects. 
4.2. Discharge Without Delay
4.2.1. Actions were taken to further embed the Discharge Without Delay programme and its
related aspects across Lanarkshire, for example, utilisation of Planned Date of
Discharge (PDD); harmonisation of Home Assessment Team services across both
HSCP areas; support for individuals to receive end-of-life care in their own homes as
preferred location of death through district nursing services. 
4.2.2. Since the peak winter period, there has been a significant reduction in the number of 
delayed discharges with the position for North and South Lanarkshire currently below 
the Scottish average and below national target (i.e. reflecting a positive performance 
position). 
4.3. Flow Navigation + Plus (FNC+)
4.3.1. The introduction and expansion of the FNC+ played a major role in the wider system
response to managing winter pressures. Increased multidisciplinary staff presence
within the FNC + Plus was essential to managing demand, for example, SAS
80

Page 81

Advanced Nurse Practitioners (ANPs) collaborating to maximise call before you
convey opportunities; physiotherapists providing assessments of musculoskeletal
presentations (which equates to 40% of all calls from NHS 24 meeting that criteria);
and primary care clinicians working to identify patients that community staff could
respond to. In addition, the first beds within NHSL’s new virtual wards became
available in November 2024, with five patient pathways initially introduced: Hospital at
Home; Call Before Convey; Respiratory Rapid Response; Outpatient Parenteral
Antimicrobial Therapy; and Mental Health. 
4.3.2. Further detail is provided within the report to the NHSL Board referred to in 4.1.2.  
4.4. Social Care Provider Sustainability 
4.4.1. Independent providers of social care in Scotland – notably care homes and care at
home providers – have highlighted the continued difficult operating environment in
which they operate. The majority of providers were able to support care as required
over the winter period in Lanarkshire  
4.5. Primary Care Access 
4.5.1.  As in previous years, the availability of national winter monies enabled a local
enhanced service to support general practices over the peak winter. Over two-thirds
of GP practices in Lanarkshire were accessible over the public holidays on 26
December 2024 and 2 January 2025 as well as Saturday 28 December 2024 and
thereafter on all the Saturdays during January 2025.   
4.5.2. There was also an extended public holiday pharmacy service available to ensure that
people can both access prescriptions as well as being available for re-direction from
NHS24, Primary Care Out of Hours Service (PCOOH), FNC+ and Emergency
Departments where possible. 
4.6. General Practice Sustainability 
4.6.1. In common with the situation across Scotland, general practices across Lanarkshire
are contending with demand and capacity challenges. Weekly reports were provided
to Scottish Government on system pressures throughout the winter period and any
GP practices that were unable to provide the full range of services that they would
normally do were contacted by to ensure all possible support was provided to ensure
sustainability issues could be managed. 
4.7. Primary Care Out of Hours Service (PCOOH)
4.7.1.  The establishment of an updated multi-disciplinary clinical model operating in the
PCOOH Service has reduced the number of occasions when alternative
arrangements require to be introduced, with these arrangements were enhanced over
the winter period. 
4.8. Contingency Arrangements for Additional Deaths 
4.8.1.  Whilst there was no reason to assume that there will be above average mortality rates
when compared to other winters, as part of the routine contingency planning required
every winter, additional mortuary capacity was identified for over the winter period.
These contingency arrangements were not required over winter 2024/2025. 
4.9. Vaccine Programme
4.9.1.  Following final advice on the winter flu and COVID-19 booster programme from the
Joint Committee on Vaccination and Immunisation (JCVI), vaccines were offered to
all the eligible groups. The local programme utilised a range of ‘pop-up’ clinics in
health centres, clinics and various local community facilities; local pharmacies for
those aged 75 years and over; hospital outpatient departments at weekends; and
81

Page 82

three ‘mass vaccination centres’ at Muirhead Clinic (Chryston), Braidfute Retail
Centre (Lanark) and Eddlewood Community Centre (Hamilton). In addition to this,
there were a range of services designed to offer vaccines to any who are in
geographical areas or part of a thematic/ethnic group where take up of vaccine may
be lower than for the general population. 
4.9.2. Despite the above, there was a reduction in vaccination uptake in comparison to last
winter, with the greatest drop in the more affluent SIMD groupings; and a continued
reduction in the number of health and social care staff vaccinated. 
4.10. Carers Support
4.10.1.  Both HSCPs worked closely with Lanarkshire Carers as well as a range of voluntary
organisations such that increased levels of support were available to carers to support
them to be able to continue to undertake their caring roles. Funding from the Carers
(Scotland) Act 2016 allocation 2024/2025 was used to enhance operational services
for carers, with a particular emphasis on Self-Directed Support (SDS). Internal
capacity within both HSCPs has been strengthened to enable frontline staff in
managing increasing demand with regards to supporting carers.  This has seen a
sharp increase in the number of carers being identified and, therefore, able to be
signposted to the respective supports. 
4.11. Staff Wellbeing
4.11.1.  There was consistent messaging throughout the winter period with a view to ensuring
that staff health and wellbeing was embedded and championed at all levels across
the respective organisations. Staff Health and Wellbeing Week showcased the
support, resources, initiatives and opportunities provided to help support staff to
manage their health and wellbeing.  Again, like the wider approach to winter planning,
this recognised pressures which are system-wide; and a shared approach to manage
the dynamic between the imperative to maintain staff health and well-being alongside
the significant demand being placed on health and social care services. 
4.11.2.  Council and Health Board employed staff were also able to access a range of
materials to support health and wellbeing through their respective employee
programmes. 
4.12. Wider Resilience 
4.12.1. The winter plan was developed as a dynamic plan and one that was able to cope with
change depending on the issues that emerged during the period. This had also been
recognised from a Local Resilience Planning (LRP) perspective and a specific multi-
agency planning exercise hosted by North Lanarkshire Council took place in
November 2024 to test system-wide planning. 
4.12.2. This particular winter period was subsequently marked by a highly unusual red
weather warning - Storm Eowyn - in late January 2025 to which LRP partners –
including NHSL, both councils and both HSCPs – responded effectively. 
4.13. Local Insights
4.13.1. Notable insights identified through the local debrief process included:- 
 importance of maximising the Lanarkshire Optimal Discharge Planning Target
Operating Model
 scope to further enhance utilisation of Home Assessment Teams in North and
South Lanarkshire
 opportunities from expanding number virtual beds and range of patient pathways
82

Page 83

 value of more tailored awareness-raising of benefits of flu vaccination to
population cohorts, supported by dissemination of up-to-date evidence to staff
 need for additional and early work to increase the uptake rate of flu vaccine for
staff ahead of coming winter
 continued necessity for staff leave and rostering to reflect appropriate service
continuity
 importance of contingency and emergency planning training and testing by LRP
 value of further evaluating impact of different components of winter response to
inform future preparations 
4.14. National Lessons Learnt
4.14.1. Scottish Government have brought forward the national “lessons learnt” process from
previous years, and consequently civil service officials have shared the following
reflections with whole system leaders:- 
 Winter preparedness planning takes a comprehensive whole system approach in
responding to a surge in demand for health and social care services over the
winter season. However, the winter period is only one such period where services
experience a surge in demand. The intention is that winter preparedness planning
also supports NHS Boards and HSCPs in surge planning throughout the year.
 Whilst some progress was made to broaden out the winter plan for 2024/2025 to
encompass both winter and generalised surge planning, more work is required
to develop this further. A key challenge is the extent to which an annual winter
preparedness plan will wish to focus on specific challenges identified for a
forthcoming winter, versus the action associated with more general surge
preparedness which will not need to change as much from year to year.
 It is, therefore, suggested that a different approach is taken in future whereby
separate general whole system Surge Guidance is developed which is less likely
to need to be significantly updated on an annual basis. This would then be
supplemented by any supplementary national planning and preparedness which
may be required alongside the Surge Planning Guidance setting out any specific
additional actions to support services associated with each winter.
 The purpose of Surge Planning Guidance will be to support health and social
care systems to work in a whole system way to respond to both anticipated and
unanticipated surges in demand. Whilst winter is a key trigger for increased
demands, it is not the only one, and dedicated surge planning guidance will build
on what individual parts of the system already to prepare for surges in demand
in a more co-ordinated, whole system approach, improving resilience over not
only winter, but any period where there is increased demand.
 Reviewing feedback on the actions within the current winter plan through this lens
suggests further work will need to be undertaken to more fully understand actions
which are specific to addressing surges in demand, versus those which are part
of ongoing work to improve patient flow and meet general demand.
 For example, whilst actions such as enhancing flow navigation centres and
reducing ambulance turnaround times may have specific elements associated
with addressing surges in demand, they are also key elements of ongoing
improvement, reform and renewal work aimed at meeting service demand more
generally.
 Surge Planning will, therefore, build on and integrate with broader reform and
renewal work (particularly that associated with the forthcoming Service Renewal
Framework) and delivery planning to ensure it is appropriately focussed on
supporting specific, whole system actions required when there is an additional
surge in demand, versus those actions being taken to address more systemic
and long-term capacity and demand management. This will build on the work of
83

Page 84

the Whole System Dashboard to help identify surges which occur both within the
winter season and at other times.
 Moving Surge Planning to its’ own dedicated guidance will allow future winter
preparedness to be more sharply focussed on the key annual activities and
actions associated with the winter season in particular. 
4.14.2. Scottish Government officials have then proposed that winter preparedness for    
2025/2026 is focussed on the following key action areas:- 
 Annual vaccination campaign for winter respiratory viruses, with a particular focus
on workforce vaccination across NHS, social care and other relevant community
settings.
 National and local public winter messaging campaigns, such as the NHS 24
winter messaging campaign and NHS Inform.
 Support the mental health and wellbeing of frontline staff who may face increased
stress associated with responding to winter pressures.
 Actions to mitigate against specific pressures arising from the four-day public
holiday period over Christmas and New Year (building on the 2017 Improving
health and social care service resilience over public holidays report).
 Action to put in place and utilise enhanced reporting and analysis of data on
system pressures throughout the winter, such as via the Whole Systems
Pressures Dashboard.
 Any specific additional actions which can be put in place over winter period
(above and beyond that set out in Surge Guidance) regarding reducing delayed
discharges; preparing the Primary Care sector, and in particular around
Pharmacy First, NHS24 and SAS preparedness; managing flow of demand into
unscheduled care services; and protection of planned care services.
 It has also been noted that much of the winter preparedness for 2024/25 was
predicated on the assumption that pressures would be broadly in line with that
seen in recent years. However, higher than anticipated levels of winter viruses
placed additional pressure on the system beyond what had been anticipated.
Drafting of the winter plan for 2025/2026 will aim to mitigate this potential
optimism bias with the intention of better preparing the system in the event of
another winter where pressures are higher than anticipated.
 In addition, in line with 2024/2025 there will be an internal facing scoping of any
‘in extremis’ measures which can be held in reserve over the winter to be
deployed in the event of exceptional circumstances. 
4.15. Scottish Government officials have indicated that there is a planning assumption 
that, in line with 2024/2025, there will be no additional specific winter preparedness 
funding in 2025/2026. 
4.16. For many years, the annual winter plan has been principally led by South 
Lanarkshire University HSCP. Given the updated national approach above (4.14.1. 
and 4.14.2.) alongside revisions to management arrangements, local winter 
preparedness planning is now being led by the NHS Lanarkshire Planning 
Directorate. 
4.17. Building on the completion of the local debrief process and its learning points, the
Lanarkshire winter planning group will be re-convened ahead of summer 2025 to begin
the preparation for winter for 2025/2026. That work will be updated and refined to
reflect the refreshed national approach and guidance as intimated by Scottish
Government above (see 4.14.1.and 4.14.2.) once published. It should be noted that
the overall approach adopted in Lanarkshire to planning for winter 2024/2025 chimes
84

Page 85

with the updated approach proposed by Scottish Government for 2025/2026 and
onwards. 
5. Employee Implications
5.1. Within the context of previously highlighted workforce challenges for health and social
care – both in Lanarkshire and across Scotland – additional health care staffing
capacity funded and secured over the winter period mitigated the impact of workforce
challenges.   
5.2. As per 4.11.1. and 4.11.2. there was consistent messaging throughout the winter
period with a view to ensuring that staff health and wellbeing was embedded and
championed at all levels across the respective organisations. Again, like the wider
approach to winter planning, this recognised pressures which are system-wide; and a
shared approach to manage the dynamic between the imperative to maintain staff
health and well-being alongside the significant demand being placed on health and
social care services. 
5.3. It has been confirmed that the vaccination programme for staff for 2025/2026 will be
exclusively for flu (except for those staff who will qualify for any other vaccines due to
their personal health issues). It is recognised that additional and early work is required
to increase the uptake rate of flu vaccine for health and social care staff ahead of
coming winter. Work is now underway to devise a programme that covers all social
care staff who would be eligible to be vaccinated. This will detail the respective
approach for each area and the various vaccination centres that would be available
for staff to access and the respective times of availability to each. This will be
accompanied by an ongoing communications process.   
6.  Financial Implications
6.1. A number of funding sources were utilised to cover the cost of the additional health
care services introduced to provide the various mitigating actions described above.
In total, around £4.0 million was utilised in funding within NHSL for all the additional
health care services. 
6.2. As per 4.15. Scottish Government officials have indicated that there is a planning
assumption that, in line with 2024/2025, there will be no additional specific winter
preparedness funding in 2025/2026. This will then have potential implications for what
arrangements and which additional supports can be prioritised as part of future
planning. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications arising from
this report. 
8. Other Implications
8.1. Winter pressures were identified within the South Lanarkshire IJB and the Council’s
Social Work Resources’ Risk Register, being increased to very high through the
winter period; and thereafter lowered as the impact reduced through March 2025 to
present. The framing of that risk is being revisited to reflect the anticipated new
guidance from Scottish Government (4.14.1.). 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required.  
85

Page 86

Professor Soumen Sengupta
Director, Health and Social Care 
19 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Working with and respecting others 
Previous References
 Social Work Resources Committee – 29 January 2025 
List of Background Papers
 Scottish Government (2017) Improving health and social care service resilience over
public holidays: report
https://www.gov.scot/publications/improving-health-social-care-service-resilience-over-
public-holidays-9781788514965/documents/ 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Cunningham, Head of Health and Social Care
Phone:  01698 453704
E-mail: craig.cunningham@lanarkshire.scot.nhs.uk 
86

Page 87

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 11 June 2025
Report by: Director, Health and Social Care  
Subject: Care Inspectorate Update for Registered Care Services
- 1 January to 31 March 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose] 
 provide an update on the outcome of inspections by the Care Inspectorate for
registered services delivered and managed by Social Work Resources for the
period 1 January to 31 March 2025
 inform the Committee on the outcome of inspections by the Care Inspectorate from
1 January to 31 March 2025 for registered external services operating within South
Lanarkshire
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): -
[recs]
(1) that the content of the report be noted. 
[1recs]
3. Background
3.1. The Care Inspectorate is the independent scrutiny and improvement organisation
responsible for regulating and inspecting care and support services for adults, children
and criminal justice social work services.  It has the authority to place
recommendations, requirements or issue an improvement notice seeking authority
through the courts to close a registered service where there is failure to comply with
or meet scrutiny and standards outlined within:- 
 The Regulation of Care (Scotland) Act 2001
 Health and Social Care Standards
 The Health and Care (Staffing) (Scotland) Act 2019 
3.2. The Care Inspectorate carries out inspections based on a range of Quality Assurance
Frameworks linking to the Health and Social Care Standards.   
https://www.careinspectorate.com/index.php/publications-statistics/147-
professionals-registration/quality-frameworks 
3.3. The quality framework is structured around 6 key questions:- 
1. How well do we support people’s wellbeing?
2. How good in our leadership?
3. How good is our staff team?
4. How good is our setting?
5. How well is care and support planned? 
9
87

Page 88

6. What is our overall capacity for improvement?
7. “How well do we support children and young people’s rights and wellbeing?” 
3.4. This additional question has been included within the quality frameworks for secure
accommodation services and care homes for children and young people and school
care accommodation (special residential schools). 
3.5. There have been no further quality framework publications since the last report. 
3.6. Evaluations are combined from the key questions outlined above, alongside the quality
indicators and grades:  6 Excellent, 5 Very Good, 4 Good, 3 Adequate, 2 Weak,
1 Unsatisfactory.  Within the six-point scale, there is now also a grading key which can
be seen below. 
The six-point scale
6 Excellent Outstanding or sector leading
5 Very Good Major strengths
4 Good Important strengths, with some areas for improvement
3 Adequate Strengths just outweigh weaknesses
2 Weak Important weaknesses – priority action required
1 Unsatisfactory Major weaknesses – urgent remedial action required 
Grading Key
(I) Grading resulting from an inspection
(C) Grading resulting from an upheld or partially upheld complaint
(E) Grading resulting from an enforcement
(A) Grading resulting from information submitted/not submitted by the provider 
3.7. Inspection grades are published by the Care Inspectorate online:- 
https://www.careinspectorate.com/index.php/publications-statistics/93-
public/datastore 
4. Inspection Outcomes - Internal
4.1. The Council is responsible for 30 registered in-house care services, noting that some
of these services are delivered from alternative sites. These services, their most recent
inspection gradings and any changes in registration are detailed in Appendix 1. 
4.2. Since the last report, 6 of the Council’s registered in-house services have been
inspected (Table 1). 
Table 1 – Recent inspections (Internal) 
Date of
Inspection
How well do we
support
people’s
wellbeing?
How well is
our care
and support
planned?
How good
is our
setting?
How
good is
our staff
team?
How good
is our
leadership?
What is the
overall
capacity for
improvement?
Key Q 1 Key Q 2 Key Q 3 Key Q 4 Key Q 5 Key Q 6
Children’s Houses – Care Home Service
Hunters
Crescent 05/02/2025 5 5 5 5 5 Not Assessed
Langlea
Avenue 27/02/2025 5 5 5 5 5 Not Assessed
88

Page 89

4.3. Hunters Crescent provides care and accommodation for looked after young people. 
Langlea Avenue provides care and accommodation for cared for young people.  The
Care Inspection teams found that both Hunters Crescent and Langlea Avenue have
significant strengths in aspects of the care provided and how these supported positive
outcomes for children and young people. It was identified that both care home services
showed a commitment to continuing care to ensure that young people were able to
focus on education, employment and health and wellbeing.  This was identified as an
area of excellence by the Care Inspectorate. 
4.4. David Walker Gardens offers residential care and support to a maximum of 50 older
people, of whom a maximum of four places will be for those 50 years and above. 
There were 39 people living in the service at the time of this inspection visit.  The
inspection team found there to be significant strengths in supporting positive outcomes
for people. An area for improvement in November 2022 had been noted.  The service
was requested to review their quality assurance processes. The Care Inspectorate
found that this had been improved, and the service was able to demonstrate how this
supported management to have a full overview of the service. The grade had been
re-assessed for quality from a 'good' to a 'very good'. 
4.5. Rutherglen Care at Home Service is registered to provide care and housing support
to people living in the community.  Care and support are provided to people with a
range of support needs in their own homes across the Rutherglen, Cambuslang and
surrounding areas.  At the time of the inspection, the service was providing care at
home support to 305 people.  The inspection team found there to be significant
strengths in aspects of the care provided and how these supported positive outcomes
for people. 
4.6. Blantyre Immediate Care is registered as a combined housing support and care at
home service. The service provides a short-term step down reablement service to a
maximum of 20 adults over 50 years of age who are experiencing a time of transition,
recovery from illness, or crisis in their life for up to a maximum of 42 days.  At the time
of the inspection, support was being provided to 20 people.  The inspection team found
there to be significant strengths in supporting positive outcomes for people.   
Date of
Inspection
How well do we
support
people’s
wellbeing?
How well is
our care
and support
planned?
How good
is our
setting?
How
good is
our staff
team?
How good
is our
leadership?
What is the
overall
capacity for
improvement?
Key Q 1 Key Q 2 Key Q 3 Key Q 4 Key Q 5 Key Q 6
Care Home Service
David Walker
Gardens 09/03/2025 5 5 5 5 5 Not Assessed
Housing Support Service
Rutherglen
Care at Home
Service
05/02/2025 5 5 Not
Assessed 5 5 Not Assessed
Blantyre
Intermediate
Care
06/02/2025 5 5 Not
Assessed 5 5 Not Assessed
Care and
Support
Service (South)
17/03/2025 5 Not
Assessed
Not
Assessed 5 Not
Assessed Not Assessed
89

Page 90

4.7. Care and Support Service (South) is a support service for people with a learning
disability. The service aims to provide a high-quality care service that supports people
to stay in their own tenancies as valued members of the community. To enable people
to lead as independent a life as possible. At the time of this inspection, the service was
being provided to 25 people in their own tenancies across the South Lanarkshire area.
The inspection team found there to be significant strengths in supporting positive
outcomes for people. The Care Inspectorate observed, positive, caring and nurturing
relationships between staff and people. Staff supported people at an appropriate pace
and involved each person when delivering support. 
4.8 Thematic Review – Justice Services
The Care Inspectorate completed a thematic review of Justice Services in respect of
the priorities outlined within the National Strategy for Community Justice.  South
Lanarkshire Justice Services volunteered to be part of the Care Inspectorate’s self-
evaluation process, trialing the new self-evaluation template created by the Care
Inspectorate in relation to performance management, quality assurance and
governance. A report on that engagement and the feedback provided was presented
to the Social Work Resources Committee at its meeting of 29 January 2025. The
national report of the thematic review can be accessed here: 
Justice Social Work – Self-evaluation of performance, quality and outcomes: A
national review 
5. Inspection Outcomes - External
5.1. There are 151 external registered care services regulated and inspected within
South Lanarkshire. These include care homes for adults, older people, and children;
short break services; support services (day opportunities); care at home services,
housing support services, school care accommodation for children aged 10 to 18, and
nurse agencies. 
5.2. During the period 1 January 2025 to 31 March 2025, thirty-four of these services were
inspected: seventeen care home services; five housing support services; eleven
support services and one nurse agency. These services and their most recent
inspection gradings are detailed in Appendix 2.   
5.3. The Care Inspectorate reported that one external provider service operating with
South Lanarkshire had declined gradings and were assessed as good (4) in more than
one indicator (Table 2) during this period. 
5.4 There are now 25 external independent care homes for children and young people
across South Lanarkshire. Children from 26 other placing local authorities tend to use
these small children’s houses.  Those placing authorities will be responsible for the
Care Management of the children and young people placed there, but whilst placed in
South Lanarkshire those children and young people will require education and health
care services. Childrens Services Partnership and Childrens Commissioners are
made aware to these services. 
90

Page 91

Table 2 – Recent inspections (External) 
5.5. Auchlochan Homecare is registered to provide a care at home service to people in
their own homes. The service is provided by MHA Auchlochan who have gone into
administration. Administrators have appointed Healthcare Management Solutions to
oversee and run the service. People who receive a service live in Auchlochan
retirement village which is located close to the village of Lesmahagow in Lanark.
At the time of the inspection, 38 people were being supported by the service.   
5.6. The Care Inspectorate undertook an inspection of Auchlochan Homecare in March
2025, with the service assessed as good (4) across four out of the five indicators
scrutinised.  A decline in gradings was highlighted compared to the previous inspection
gradings.  Inspectors identified that improvements are required in the oversight,
recording and reporting of information, with relevant information being reported to the
Care Inspectorate in line with legislation, ensuring that care and support is consistent
with the Health and Social Care Standards. It was also identified by the Care
Inspectorate that the provider should ensure completion of the quality assurance
processes in place in order to support improvements within the service. 
5.7. Netherlethame is a care home for children and young people. The service provider is
Common Thread Group and is registered to care for three children and young people.
Netherlethame is a large rural property near Strathaven. 
5.8. The Care Inspectorate undertook a follow up inspection of Netherlethame in February
2025, to examine progress made in relation to requirements and areas for
improvement made at a full inspection in April 2024. Despite some progress being
made in relation to the four requirements set at the last inspection, these were all
assessed as not met and gradings of weak (2) across all indicators were advised. This
inspection highlighted the importance of the provider undertaking an analysis of the
variety of incidents that are recorded, including child protection referrals and occasions
when young people are missing from home. This would support staff to capture
learning, identify future support needs and more effectively manage risk. Within the
report it had been highlighted that there had been a period of time since the last
inspection that young people's safety had been compromised with some poor
outcomes identified. The process of risk assessment had been poor, with minimal
reflection as an organisation on decision making. 
6. Employee Implications
6.1. There are no direct employee implications in relation to this report.   
Date of
Inspection
How well do we
support
people’s
wellbeing?
How well is
our care
and support
planned?
How good
is our
setting?
How
good is
our staff
team?
How good
is our
leadership?
What is the
overall
capacity for
improvement?
Key Q 1 Key Q 2 Key Q 3 Key Q 4 Key Q 5 Key Q 6
Support Service
Auchlochan
Homecare 10/03/2025 5 4 Not
Assessed 4 4 Not Assessed
Children’s Houses – Care Home Service
Netherlethame 26/02/2025 2 2 2 2 2 Not Assessed
91

Page 92

7. Financial Implications
7.1. There are no direct financial implications in relation to this report.   
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The context of this report relates to the following risk within the Council and the Social
Work Risk registers:- 
 Failure to comply with or meet the expected standards, scrutiny levels, or
improvement as identified by regulatory bodies. – Social Work residual risk
scoring of 12. 
9.2. A review of all recommendations and actions cited within Care Inspectorate reports for
in-house services has been undertaken by officers. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function, or strategy, or recommend a
change to existing policy, function, or strategy and, therefore, no impact assessment
is required. 
Professor Soumen Sengupta
Director, Health and Social Care 
15 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs.
 Working with and respecting others.
 Accountable, effective, efficient, and transparent. 
Previous References
 None 
List of Background Papers
 https://www.careinspectorate.com/index.php/publications-statistics/93-public/datastore 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Liam Purdie, Head of Children and Justice Services and Chief Social Work Officer
Ext: 4887 (Phone: 01698 454887)
Email:  liam.purdie@southlanarkshire.gov.uk 
92

Page 93

Appendix 1:  Internal Care Inspectorate Gradings as of 31 March 2025 
Year of inspection Service Latest
Inspection
How well do we
support people's
wellbeing?
How well is
our care and
support
planned?
How good is
our setting?
How good is
our staff team?
How good is our
leadership?
2025 
Care at Home Care and Support Service (South) 17/03/2025 5 Not Assessed Not Assessed 5 Not Assessed
Care Home Service David Walker Gardens 09/03/2025 5 5 5 5 5
Children & Young People Langlea Avenue 27/02/2025 5 5 5 5 5
Care at Home Blantyre Intermediate Care 06/02/2025 5 5 Not Assessed 5 5
Care at Home Rutherglen Care at Home Service 05/02/2025 5 5 Not Assessed 5 5
Children & Young People Hunters Crescent 05/02/2025 5 5 5 5 5
2024 
Care at Home Hamilton Home Care Service 03/12/2024 5 5 Not Assessed 5 5
Care at Home East Kilbride Home Care Service 19/11/2024 5 Not Assessed Not Assessed 5 Not Assessed
Care Home Older McKillop Gardens* 28/11/2024 5 5 5 5 5
Home First (HAT) Home Assessment Team (Hamilton &
Clydesdale)
30/10/2024 5 5 Not Assessed 5 4
Home First (HAT) Home Assessment Team (East Kilbride &
Rutherglen)
23/09/2024 5 5 Not Assessed 5 4
Care at Home Clydesdale Homecare 24/05/2024 5 5 Not Assessed 5 5
Care Home Older Meldrum Gardens 18/01/2024 5 5 5 5 5
2023       
Children’s House Station Road 22/09/2023 4 4 4 4 4
Children & Family South Lanarkshire Council - Adoption Service 27/03/2023 4 5 Not Assessed 5 5
Children & Family South Lanarkshire Council - Fostering Service 27/03/2023 5 5 Not Assessed 5 4
2022 
Children’s House Bardykes Road 29/07/2022 5 5 5 5 5
Children’s House Hillhouse 30/06/2022 5 5 5 5 5
Children’s House Rosslyn Avenue 13/05/2022 5 5 5 5 5
2019
Day Services Harry Heaney Centre 10/05/2019 5 5 5 5 5
Day Services South Lanarkshire Lifestyles - Fairhill 22/01/2019 5 5 5 5 5
C&F Supported Carers Service 22/01/2019 5 5 Not Assessed 5 5
93

Page 94

Year of inspection Service Latest
Inspection
How well do we
support people's
wellbeing?
How well is
our care and
support
planned?
How good is
our setting?
How good is
our staff team?
How good is our
leadership?
2017
Day Services South Lanarkshire Lifestyles Eastfield 15/11/2017 5 5 5 5 4
Day Services Meldrum House 05/06/2017 5 5 5 5 5
Day Services South Lanarkshire Lifestyles - Stonehouse 26/05/2017 5 5 5 4 5
Day Service Lesmahagow Neighbourhood Centre 07/02/2017 5 5 6 5 5
2016
Day Service South Lanarkshire Lifestyles East Kilbride 13/12/2016 5 5 5 5 5
Day Service Newberry Rooney 22/11/2016 5 5 5 5 4
2015       
Day Service Lifestyle Lanark, Harry Smith Complex 12/08/2015 6 6 6 6 6 
94

Page 95

Appendix 2:  Care Inspectorate Gradings – South Lanarkshire External Providers as of 31 March 2025 
CSNumber Care Service Subtype Service
Type Service Name
Publication
of Latest
Grading
Last
inspection
Date
Support
Wellbeing
Care and
Support
Planning
Setting Staff
Team Leadership Grade
change
CS2003001376
Care Home
Service Older People
Voluntary or
Not for Profit
Abbeyfield
Rutherglen Society
Limited 11/11/2024 30/10/2024 3 4 4 3 3 Same
CS2003001385
Care Home
Service
Learning
Disabilities
Voluntary or
Not for Profit Clannalba 26/10/2022 23/03/2025 5 4 4 5 5 Same
CS2003001386
Care Home
Service
Learning
Disabilities
Voluntary or
Not for Profit New Ridgepark 13/01/2025 12/12/2024 4 4 3 3 3 Same
CS2003001388
Care Home
Service
Learning
Disabilities Private
Castle Street Care
Home, Living
Ambitions Limited 02/09/2024 02/08/2024 3 3 4 4 4 Same
CS2003001398
Care Home
Service
Mental Health
Problems
Voluntary or
Not for Profit
Sheriff Park
Service 10/12/2024 14/11/2024 5 6 6 6 5 Same
CS2003001400
Care Home
Service
Learning
Disabilities
Voluntary or
Not for Profit Lanark Project 22/09/2022 27/03/2025 5 4 5 5 5 Same
CS2003001401
Care Home
Service
Learning
Disabilities
Voluntary or
Not for Profit
Threshold Support
Services -
Residential 15/01/2025 09/12/2024 4 4 4 4 3 Same
CS2003010439
Care Home
Service
Mental Health
Problems Private Southview 08/07/2024 02/07/2024 3 3 3 3 3 Same
CS2003010440
Care Home
Service Older People Private Greencross 02/04/2024 21/03/2024 5 4 4 4 4 Same
CS2003010566
Care Home
Service Older People Private
Clinton House
Nursing Home 20/11/2023 25/10/2023 4 4 4 4 4 Same
CS2003010577
Care Home
Service Older People Private
Greenhills Care
Home 25/03/2025 29/10/2024 3 3 3 3 3 Same
CS2003010597
Care Home
Service Older People Private
Westwood House
Nursing Home 05/12/2023 26/10/2023 4 4 4 4 4 Same
CS2003015114
Care Home
Service
Learning
Disabilities
Voluntary or
Not for Profit
Scottish Autism -
South West Area
Services - Staikhill 21/05/2024 10/05/2024 4 4 4 4 4 Same
CS2003015475
Care Home
Service
Physical and
Sensory
Impairment
Voluntary or
Not for Profit
Lanarkshire
Houses 06/02/2023 26/01/2023 4 5 5 5 4 Same
CS2003041409
Care Home
Service Older People Private
Abbey Lodge Care
Home 25/11/2024 13/11/2024 5 4 4 5 4 Same
CS2003041861
Care Home
Service
Respite Care
and Short
Breaks
Voluntary or
Not for Profit
South Lanarkshire
Short Break
Service 13/02/2020 27/04/2022 5 4 5 5 5 Same
CS2003046475
Care Home
Service Older People Private
Whitehills Care
Home 21/10/2024 16/10/2024 3 3 3 3 3 Same
95

Page 96

CSNumber Care Service Subtype Service
Type Service Name
Publication
of Latest
Grading
Last
inspection
Date
Support
Wellbeing
Care and
Support
Planning
Setting Staff
Team Leadership Grade
change
CS2003047729 Support Service
Other than
Care at home
Voluntary or
Not for Profit
Hamilton Towers
Resource Centre 20/07/2018 18/06/2018 4 4 4 4 4 Same
CS2003050656
Care Home
Service Older People Private Lindsayfield Lodge 19/04/2024 01/03/2024 5 5 5 5 4 Same
CS2004058239
Housing Support
Service  
Voluntary or
Not for Profit
Scottish Autism -
South West
Scotland Services 08/10/2024 26/09/2024 5 5
Not
Assessed 5 5 Same
CS2004061323
Housing Support
Service  
Voluntary or
Not for Profit
The Richmond
Fellowship
Scotland - South
Lanarkshire 1 15/03/2024 26/02/2024 5 5
Not
Assessed 4 5 Same
CS2004061324 Support Service Care at Home
Voluntary or
Not for Profit
The Richmond
Fellowship
Scotland - South
Lanarkshire 1 -
Care at Home 15/03/2024 26/02/2024 5 5
Not
Assessed 4 5 Same
CS2004061337
Housing Support
Service  
Voluntary or
Not for Profit
The Richmond
Fellowship
Scotland - East
Renfrewshire &
South Lanarkshire
2 01/10/2024 23/08/2024 5 6
Not
Assessed 5 6 Same
CS2004066246
Housing Support
Service  
Voluntary or
Not for Profit
Abbeyfield
Strathaven &
District Society Ltd 13/07/2023 22/06/2023 5 5
Not
Assessed 5 5 Same
CS2004068390
Housing Support
Service  
Voluntary or
Not for Profit
Hamilton
Supported Living
Service - Housing
Support Service 12/02/2025 21/01/2025 5 5
Not
Assessed 5 4 Same
CS2004068399 Support Service Care at Home
Voluntary or
Not for Profit
Hamilton
Supported Living -
Care at Home
Service 12/02/2025 21/01/2025 5 5
Not
Assessed 5 4 Same
CS2004068451
Housing Support
Service  
Voluntary or
Not for Profit
Source Housing
Support Service 04/03/2020 06/03/2025 6 6
Not
Assessed 6 5 Same
CS2004068454 Support Service Care at Home
Voluntary or
Not for Profit
Source Housing
Support Service 04/03/2020 06/03/2025 6 6
Not
Assessed 6 5 Same
CS2004069240 Support Service Care at Home Private Real Care Agency 27/01/2025 09/01/2025 3 3
Not
Assessed 3 3 Same
CS2004071231 Support Service Care at Home
Voluntary or
Not for Profit
Rutherglen
Community Carers 25/03/2025 28/02/2025 5 5
Not
Assessed 5 5 Same
96

Page 97

CSNumber Care Service Subtype Service
Type Service Name
Publication
of Latest
Grading
Last
inspection
Date
Support
Wellbeing
Care and
Support
Planning
Setting Staff
Team Leadership Grade
change
CS2004079128
Housing Support
Service  
Voluntary or
Not for Profit
The Hamilton
Project 02/09/2019 05/08/2019 5 5
Not
Assessed 5 5 Same
CS2004079130
Housing Support
Service  
Voluntary or
Not for Profit The Lanark Project 03/11/2017 19/10/2017 5 5
Not
Assessed 5 5 Same
CS2004080095
Housing Support
Service   Private Real Care Agency 27/01/2025 09/01/2025 3 3
Not
Assessed 3 3 Same
CS2005102377
Care Home
Service Older People Private
Arberglen Care
Home 02/07/2024 20/06/2024 3 3 3 3 3 Same
CS2005108192
Care Home
Service Older People Private
Beechgrove Care
Home 13/06/2022 21/03/2025 5 4 5 4 5 Same
CS2005110586
Care Home
Service
Children &
Young People
Voluntary or
Not for Profit
Action for Children
- Silverton Short
Breaks 16/05/2024 28/02/2024 5 5 5 5 5 Same
CS2006115094
Care Home
Service Older People Private Rosaburn House 21/10/2024 25/09/2024 4 4 4 5 4 Same
CS2006117311
Care Home
Service Older People Private
Miltongrange
Nursing Home 16/07/2024 17/06/2024 4 4 4 4 4 Same
CS2006131737
Care Home
Service Older People Private
Woodhurst Care
Centre 15/05/2024 09/05/2024 4 4 3 4 3 Same
CS2006137442
Care Home
Service
Learning
Disabilities Private
Collisdene Care
Centre 09/10/2024 25/09/2024 4 3 3 3 3 Same
CS2007142366
Housing Support
Service  
Voluntary or
Not for Profit
Wheatley Care
South Lanarkshire
Personalised
Support Services 06/01/2020 15/11/2019 5 5
Not
Assessed 4 5 Same
CS2007143644 Support Service Care at Home
Voluntary or
Not for Profit
Touchbase
Lanarkshire 17/02/2025 09/01/2025 5 5 4 5 5 Same
CS2007144696
Care Home
Service
Children &
Young People Private
Kyllimoons Care
Home 12/05/2023 20/03/2023 6 6 6 6 6 Same
CS2007144754
Care Home
Service
Children &
Young People Private Tanglewood 19/09/2024 02/05/2024 6 6 6 6 6 Same
CS2008169473
Care Home
Service
Children &
Young People Private Rowallan 07/03/2025 08/11/2024 5 5 5 5 5 Same
CS2008172862
Care Home
Service Older People Private Croftbank House 24/03/2025 14/03/2025 5 4 4 5 5 Same
CS2008184563
Care Home
Service Older People Private
Dunvegan Lodge
Care Home 02/02/2024 30/01/2024 4 4 4 5 5 Same
CS2008191123
Housing Support
Service  
Voluntary or
Not for Profit
Threshold Support
Services - Housing
Support 24/07/2024 05/07/2024 5 5
Not
Assessed 5 5 Same
97

Page 98

CSNumber Care Service Subtype Service
Type Service Name
Publication
of Latest
Grading
Last
inspection
Date
Support
Wellbeing
Care and
Support
Planning
Setting Staff
Team Leadership Grade
change
CS2008192338 Support Service Care at Home
Voluntary or
Not for Profit
Threshold Support
Services - Care at
Home 24/07/2024 05/07/2024 5 5
Not
Assessed 5 5 Same
CS2008192910 Support Service Care at Home
Voluntary or
Not for Profit
Auchlochan
Homecare 21/03/2025 10/03/2025 5 4
Not
Assessed 4 4 Decline
CS2009193751 Support Service
Other than
Care at home Private
Dunvegan Lodge
Day Care 25/09/2022 13/05/2022 5 5 4 5 5 Same
CS2009194187
Care Home
Service
Learning
Disabilities
Voluntary or
Not for Profit Cherry Tree Court 20/02/2024 25/01/2024 5 5 4 4 5 Same
CS2009233687
Housing Support
Service  
Voluntary or
Not for Profit
Eva Burrows 1st
Stop
Accommodation
Project 21/07/2017 24/05/2017 6 6
Not
Assessed 6 5 Same
CS2010250122
Housing Support
Service   Private
CERA - East
Kilbride 25/11/2024 04/11/2024 4 4
Not
Assessed 4 4 Same
CS2010250137 Support Service Care at Home Private
CERA - East
Kilbride 25/11/2024 04/11/2024 4 4
Not
Assessed 4 4 Same
CS2010270301
Care Home
Service
Children &
Young People Private Devonside 20/12/2024 15/11/2024 4 4 4 4 4 Same
CS2010272692 Support Service
Other than
Care at home
Voluntary or
Not for Profit
East Kilbride &
District Dementia
Carers' Group 09/07/2019 03/07/2019 5 5 6 5 6 Same
CS2010275360 Support Service Care at Home
Voluntary or
Not for Profit
Up2Us Support
Service 09/05/2023 21/04/2023 5 5
Not
Assessed 5 4 Same
CS2010275380
Housing Support
Service  
Voluntary or
Not for Profit
Up2Us Support
Service 09/05/2023 21/04/2023 5 5
Not
Assessed 5 4 Same
CS2010279555 Nurse Agency   Private
Initial Healthcare
Ltd 17/10/2023 14/09/2023 4 5
Not
Assessed 5 4 Same
CS2011281083 Support Service Care at Home Private
Priory Supported
Living in Scotland 20/05/2024 18/04/2024 4 4
Not
Assessed 4 4 Same
CS2011281086
Housing Support
Service   Private
Priory Supported
Living in Scotland 20/05/2024 18/04/2024 4 4
Not
Assessed 4 4 Same
CS2011285878
Care Home
Service Older People Private
Flemington Care
Home 17/06/2024 31/05/2024 3 3 3 4 3 Same
98

Page 99

CSNumber Care Service Subtype Service
Type Service Name
Publication
of Latest
Grading
Last
inspection
Date
Support
Wellbeing
Care and
Support
Planning
Setting Staff
Team Leadership Grade
change
CS2011286888
Housing Support
Service   Private
Right There
Pathways 28/02/2020 13/11/2019 5 5
Not
Assessed 4 4 Same
CS2011289574
Housing Support
Service  
Voluntary or
Not for Profit
Women's Aid
South Lanarkshire
and East
Renfrewshire 16/05/2019 04/04/2019 6 6
Not
Assessed 5 6 Same
CS2011300687
Care Home
Service Older People Private
Douglas View
Care Home 10/06/2024 23/05/2024 5 4 4 5 5 Same
CS2011300794
Care Home
Service Older People Private
Cathkin House
Care Home 25/09/2023 17/08/2023 5 4 4 5 4 Same
CS2011301120
Care Home
Service Older People Private
Avonbridge Care
Home 24/02/2025 23/01/2025 3 4 4 4 5 Same
CS2011301463
Care Home
Service Older People Private
Lornebank Care
Centre 15/04/2024 13/03/2024 4 4 4 4 4 Same
CS2011304632
Care Home
Service Older People Private
Duncraggan Care
Home 27/02/2025 11/02/2025 3 3 3 4 3 Same
CS2012306827 Support Service Care at Home Private
Bluebird Care
(South
Lanarkshire) 28/08/2019 18/03/2025 4 4
Not
Assessed 4 4 Same
CS2012307320
Care Home
Service
Children &
Young People Private Green Pastures 03/02/2025 21/01/2025 5 5 5 5 5 Same
CS2012310877
Housing Support
Service  
Voluntary or
Not for Profit
Charles Brownlie
House 18/04/2024 25/03/2024 5 5
Not
Assessed 5 5 Same
CS2012311539
Care Home
Service
Learning
Disabilities Private Millburn Homes 17/05/2022 17/03/2025 4 4 5 4 4 Same
CS2013320586
Care Home
Service Older People Private
Victoria House
Care Home 17/10/2024 10/10/2024 4 3 4 4 4 Same
CS2013322705
Care Home
Service Older People
Voluntary or
Not for Profit Lower Johnshill 17/06/2024 02/05/2024 4 3 4 3 4 Same
CS2014331925
Care Home
Service
Children &
Young People Private Blairbeth Road 02/10/2024 29/08/2024 5 5 5 5 5 Same
CS2015336900
Care Home
Service
Children &
Young People Private Duneaton 14/05/2024 12/03/2025 4 4 4 4 4 Same
CS2015339267 Support Service Care at Home
Voluntary or
Not for Profit
Scottish Autism -
South West
Scotland Services 08/10/2024 26/09/2024 5 5
Not
Assessed 5 5 Same
CS2015339598
Care Home
Service Older People Private
Avonhaugh
Nursing Home 27/03/2025 24/03/2025 4 4 4 5 4 Same
CS2015342773 Support Service Care at Home Private
Angels Home Care
Lanarkshire Ltd 11/10/2023 04/10/2023 5
Not
Assessed
Not
Assessed
Not
Assessed 4 Same
99

Page 100

CSNumber Care Service Subtype Service
Type Service Name
Publication
of Latest
Grading
Last
inspection
Date
Support
Wellbeing
Care and
Support
Planning
Setting Staff
Team Leadership Grade
change
CS2015343491
Care Home
Service
Children &
Young People Private The Cottage 20/01/2025 20/12/2024 5 5 5 5 5 Same
CS2015343505 Support Service Care at Home Private
Care Solutions
Central Scotland 30/01/2024 05/10/2023 4 5
Not
Assessed 5 4 Same
CS2016349466
Care Home
Service
Children &
Young People Private
Care Visions - The
Knowe 13/03/2025 21/02/2025 5 5 5 5 5 Same
CS2016350030
Care Home
Service Older People Private
Georgia Park Care
Home 24/02/2025 11/02/2025 3 3 4 4 3 Same
CS2016350328 Support Service Care at Home Private
Heather's Bespoke
Care 05/02/2025 22/01/2025 5 5
Not
Assessed 4 4 Same
CS2016350565 Support Service Care at Home Private
Home Instead
South Lanarkshire 18/11/2024 24/10/2024 5 5
Not
Assessed 5 5 Same
CS2016350780
Care Home
Service
Mental Health
Problems Private
Clyde Valley Care
Home 27/03/2025 25/03/2025 5 4 4 5 5 Same
CS2016351239
Care Home
Service
Alcohol & Drug
Misuse Private Calderglen House 28/04/2023 18/04/2023 4 4 4 4 4 Same
CS2016352774
Housing Support
Service  
Voluntary or
Not for Profit
Hanover Housing
Support Service -
Care (East) 06/05/2022 08/03/2022 5 5
Not
Assessed 5 5 Same
CS2017353798 Support Service Care at Home Private
Bespoke Clinical
Care 11/07/2024 13/06/2024 5 6
Not
Assessed 5 4 Same
CS2017353831 Support Service Care at Home
Voluntary or
Not for Profit
Together in
Lanarkshire 20/07/2020 25/02/2020 5 5 5 5 5 Same
CS2017354591 Support Service Care at Home
Voluntary or
Not for Profit
Sense Scotland
Supported Living
Lanarkshire 2 &
surrounding area 14/12/2023 22/11/2023 5 5
Not
Assessed 5 5 Same
CS2017354593
Housing Support
Service  
Voluntary or
Not for Profit
Sense Scotland
Supported Living
Lanarkshire 2 &
surrounding area 14/12/2023 22/11/2023 5 5
Not
Assessed 5 5 Same
CS2017358108
Care Home
Service Older People Private
Abbeydale Court
Care Centre 28/11/2024 26/11/2024 4 4 3 4 4 Same
CS2017360075 Support Service Care at Home
Voluntary or
Not for Profit
Abbeyfield
Strathaven &
District Society Ltd 13/07/2023 22/06/2023 5 5
Not
Assessed 5 5 Same
CS2017361020
Care Home
Service Older People Private
Rutherglen Care
Home 13/02/2025 20/01/2025 3 4 3 3 3 Same
100

Page 101

CSNumber Care Service Subtype Service
Type Service Name
Publication
of Latest
Grading
Last
inspection
Date
Support
Wellbeing
Care and
Support
Planning
Setting Staff
Team Leadership Grade
change
CS2018363986 Support Service Care at Home Private
All New
Beginnings Ltd 01/10/2024 06/09/2024 4 3
Not
Assessed 5 4 Same
CS2018365629
Care Home
Service
Children &
Young People Private Glenochar 15/10/2024 10/09/2024 4 4 4 4 4 Same
CS2018365850 Nurse Agency   Private
Newcross
Healthcare
Scotland 25/05/2023 06/04/2023 5
Not
Assessed
Not
Assessed
Not
Assessed 5 Same
CS2018365959
Care Home
Service Older People Private
Bothwell Castle
Care Home 08/02/2024 25/01/2024 5 5 5 4 5 Same
CS2018368484
Care Home
Service
Learning
Disabilities
Voluntary or
Not for Profit
Arran House Care
Home 23/07/2024 05/07/2024 5 5 5 4 5 Same
CS2018369578
Housing Support
Service   Private
Constance Care
South Lanarkshire 31/07/2024 10/07/2024 3 3
Not
Assessed 3 3 Same
CS2018369579 Support Service Care at Home Private
Constance Care
South Lanarkshire 31/07/2024 10/07/2024 3 3
Not
Assessed 3 3 Same
CS2018370582 Support Service Care at Home Private
Care1 Professional
Services Ltd 07/11/2024 29/10/2024 3 3
Not
Assessed 4 3 Same
CS2018371827
Care Home
Service
Children &
Young People Private
Clyde Valley
House 19/12/2022 08/11/2022 5 5 5 5 5 Same
CS2019372791
Care Home
Service
Children &
Young People Private
Lettershaws Farm
Cottage 15/07/2024 24/06/2024 4 4 4 4 4 Same
CS2019373277
Care Home
Service
Children &
Young People Private Forest View 11/01/2024 23/11/2023 6 6 6 6 6 Same
CS2019376139 Support Service Care at Home Private
JKL Care Service
Ltd 07/12/2022 06/10/2022 5 4
Not
Assessed 4 5 Same
CS2019376883
Care Home
Service Older People Private
Crosslaw House
Care Home 23/05/2024 02/05/2024 4 4 3 4 3 Same
CS2019377045
Care Home
Service
Children &
Young People Private Drummond House 19/07/2023 26/05/2023 5 5 5 5 5 Same
CS2019377305
Care Home
Service
Children &
Young People
Voluntary or
Not for Profit
Stanmore Care
Home Service 21/09/2024 08/08/2024 3 3 3 3 3 Same
CS2019377387 Support Service
Other than
Care at home
Voluntary or
Not for Profit Stanmore Lifeskills 20/09/2022 16/06/2022 5 4 5 4 4 Same
CS2019377460
Housing Support
Service  
Voluntary or
Not for Profit
Wheatley Care
South Lanarkshire
Self Directed
Support Service   28/03/2025 5 5 5 5 5  
101

Page 102

CSNumber Care Service Subtype Service
Type Service Name
Publication
of Latest
Grading
Last
inspection
Date
Support
Wellbeing
Care and
Support
Planning
Setting Staff
Team Leadership Grade
change
CS2019377604
School Care
Accommodation
Service
Residential
Special School
Voluntary or
Not for Profit Blackwood Manor 18/03/2022 16/02/2022 5 5 5 5 5 Same
CS2019378407 Support Service Care at Home
Voluntary or
Not for Profit
Wheatley Care
South Lanarkshire
Self Directed
Support Service   28/03/2025 5 5
Not
Assessed 5 5  
CS2019378604
Care Home
Service Older People Private
Abercorn House
Care Home 26/02/2024 14/02/2024 5 5 5 5 5 Same
CS2019378609
Care Home
Service Older People Private
Forefaulds Care
Home 04/02/2025 31/01/2025 4 4 4 4 4 Same
CS2020379227
Care Home
Service
Children &
Young People Private Heath House 03/04/2024 07/02/2024 4 4 4 4 4 Same
CS2020379342
Care Home
Service
Children &
Young People Private
Glengeith
Farmhouse 18/08/2023 27/07/2023 4 4 4 4 4 Same
CS2020379357
Care Home
Service
Children &
Young People Private Netherlethame 21/03/2025 26/02/2025 2 2 2 2 2 Same
CS2020379379 Support Service Care at Home Private Lica Homecare Ltd 25/07/2024 18/07/2024 4 4
Not
Assessed 4 3 Same
CS2020380197
Care Home
Service
Children &
Young People Private Nurture One Ltd 01/07/2024 27/05/2024 4 4 4 4 4 Same
CS2020380764 Support Service Care at Home Private
Newcross
Healthcare
Scotland Care at
Home 04/02/2025 19/12/2024 3 3
Not
Assessed 3 2 Same
CS2021000031 Support Service Care at Home Private
Bespoke Care
Services Ltd 15/11/2023 18/10/2023 4 4
Not
Assessed 4 4 Same
CS2021000285
Care Home
Service
Children &
Young People Private Crawford House 10/10/2024 27/08/2024 2 2 2 2 2 Same
CS2022000052 Support Service Care at Home Private
Trust Community
Care Limited 06/01/2025 03/12/2024 3 3
Not
Assessed 3 3 Same
CS2022000101
Care Home
Service
Children &
Young People
Voluntary or
Not for Profit
Stepdown
Cambuslang and
Carntyne 12/07/2024 10/06/2024 4 4 4 4 4 Same
CS2022000306
Care Home
Service
Children &
Young People Private Coalburn House 06/01/2025 09/12/2024 4 4 4 4 4 Same
CS2022000327
Care Home
Service Older People Private
Ryan Meadows
Care Home 24/03/2025 06/03/2025 4 3 4 3 4 Same
102

Page 103

CSNumber Care Service Subtype Service
Type Service Name
Publication
of Latest
Grading
Last
inspection
Date
Support
Wellbeing
Care and
Support
Planning
Setting Staff
Team Leadership Grade
change
CS2023000164 Nurse Agency   Private
Response
Healthcare
Solutions LTD 18/03/2025 28/02/2025 4
Not
Assessed
Not
Assessed
Not
Assessed 4  
CS2023000263 Support Service Care at Home Private
Carluke Dignity
Care 18/03/2025 28/02/2025 4 4
Not
Assessed 4 4  
CS2023000264
Housing Support
Service   Private
Carluke Dignity
Care 18/03/2025 28/02/2025 4 4
Not
Assessed 4 4  
CS2023000393 Support Service Care at Home Private
Divine Care and
Support Services
(Scotland) Limited 05/12/2024 19/11/2024 3 3
Not
Assessed 3 3 Same
CS2023000425 Support Service Care at Home Private Okola Care Ltd    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed  
CS2024000136
Housing Support
Service   Private Angels Home Care 11/10/2023 04/10/2023 5
Not
Assessed
Not
Assessed
Not
Assessed 4 Same
CS2024000141
Care Home
Service Older People
Voluntary or
Not for Profit
St. Catherine's
Care Home 18/12/2024 11/12/2024 5 5 5 5 5 Same
CS2024000171
Housing Support
Service   Private
JKL Care Service
Ltd 07/12/2022 06/10/2022 5 4
Not
Assessed 4 5 Same
CS2024000242 Support Service Care at Home Private
Friends For Life
Healthcare
Services Ltd    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed  
CS2024000338
Care Home
Service
Children &
Young People Private Anitas Dawn    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed  
CS2024000340 Nurse Agency   Private
MacLaren
Healthcare Ltd    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed  
CS2024000349 Support Service Care at Home Private
SRS Care
Solutions (Central)
Ltd 28/02/2025 30/01/2025 4 4
Not
Assessed 3 3 Same
CS2024000404
Care Home
Service
Children &
Young People Private 82 Main Street    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed  
CS2024000414
Housing Support
Service   Private
Care1 Professional
Services LTD 07/11/2024 29/10/2024 3 3
Not
Assessed 4 3 Same
103

Page 104

CSNumber Care Service Subtype Service
Type Service Name
Publication
of Latest
Grading
Last
inspection
Date
Support
Wellbeing
Care and
Support
Planning
Setting Staff
Team Leadership Grade
change
CS2024000435 Support Service Care at Home Private Adigo Care    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed  
CS2024000436
Housing Support
Service   Private Adigo Care    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed  
CS2025000004 Support Service Care at Home Private
MacLaren
Homecare    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed  
CS2025000005
Housing Support
Service   Private
MacLaren
Homecare Ltd    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed  
CS2025000068
Housing Support
Service   Private Lica Homecare Ltd 25/07/2024   4 4
Not
Assessed 4 3  
CS2025000103
Care Home
Service Older People Private
Ashlea Court Care
Home    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed  
CS2025000122
Care Home
Service Older People Private
Bankhouse Care
Home    
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed
Not
Assessed   
Source:  https://www.careinspectorate.com/index.php/publications-statistics/93-public/datastore
104

Page 105

Report
Agenda Item 
Report to: Social Work Resources Committee
Date of Meeting: 11 June 2025
Report by: Director of Health and Social Care  
Subject: Notification of Contracts Awarded: 1 October 2024 to
31 March 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification in line with Standing Orders on Contracts to Committee of
contracts awarded by Social Work Resources during the period 1 October 2024
to 31 March 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the details of the contracts awarded be noted.
[1recs]
3. Background
3.1. It is a requirement of Clauses 21.8 and 22.5 of the Standing Orders on Contracts that
details of the acceptance of all tenders above £50,000 be reported retrospectively to
the relevant Committee for noting, other than those under Clause 21.3 where the
award is not the lowest in a price only tender, or costs exceed the approved financial
provision.  In these instances, a report is submitted to the appropriate Committee
and subsequent authority to award is granted by that Committee. 
4. Contract Awards
4.1. Contracts awarded for the period 1 October 2024 to 31 March 2025, on the basis of
lowest offer and/or most economically advantageous offer submitted, are detailed in
Appendix 1.  
5. Employee Implications
5.1. Contract management, including performance appraisal, will be undertaken by both
Social Work Resources and the Procurement Service. 
6. Financial Implications
6.1. Appropriate budgetary provision is available for each of the contracts awarded. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications arising
from the information presented in this report. 
10
105

Page 106

8. Other Implications
8.1. There are no direct risks or implications for sustainability in terms of the information
contained in this report. 
9.  Integrated Impact Assessment and Consultation Requirements 
9.1. This report does not introduced a new policy, function or strategy or recommend a
change to an existing policy funding or strategy and, therefore, no impact
assessment is required. 
9.2. There was no requirement to undertake any consultation in terms of the information
contained within this report. 
Professor Soumen Sengupta
Director, Health and Social Care 
8 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Social Work Resources Committee – 29 January 2025 
List of Background Papers
Previous References
 Standing Orders on Contracts 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Emma Smith, Corporate Procurement and Transactions Manager
Ext:  5329 (Tel:  01698 455329)
E-mail: emma.smith@southlanarkshire.gov.uk
106

Page 107

Appendix 1 
Contracts Awarded by Social Work Resources over £50,000 in value 
Contract
Reference
Number
Contract Description Provider Name Contract
Value Start Date End Date Extension
Date
Contract
Award Date
SLC/SW/23/040  Care Home Service for Adults
with Learning Disabilities –
Cherry Tree Court 
The Richmond Fellowship Scotland 
£22,817,154   01-Apr-2024   31-Mar-2029   31-Mar-2031   23-Sep-2024  
SLC/SW/24/058 
Care Home for Adults with
Mental Health Difficulties,
Neurodiverse and Learning
Difficulties – Catalina House 
St Philips Care Caledonia Ltd 
£333,331  01-Oct-2024  30-Sep-2027  30-Sep-2028  10-Oct-2024 
SLC/SW/23/097 
Provision of Outdoor Learning
Activities for Family Support
Hubs, Children and Young
People 
South Lanarkshire Leisure & 
Culture Ltd  
£125,000  04-Nov-2024  03-Nov-2027  03-Nov-2029  17-Oct-2024 
SLC/SW/24/001 
Specialist Residential Care-
Pine Cottages 
Mental Health Care (UK)  
£870,369  01-Nov-2024  31-Oct-2027  -  17-Oct-2024 
SLC/SW/24/040  
Specialist Residential Care for
CM-7199061 at Graham
Anderson House 
The Disabilities Trust 
£258,312   15-Oct-2024   14-Apr-2025   14-Oct-2025   17-Oct-2024  
SLC/SW/23/035  Care at Home and Housing
Support Services Procured
Services Arrangement (PSA) –
Phase 3 
Care Solutions Homecare Ltd, 
Medd Care Services Ltd, 
Adigo Care, 
Care1 Professional Services Ltd, 
Oncall Care Services Ltd, 
Trust Community Care Limited 
£714,300,000  01-Jul-2024  30-Jun-2034  30-Jun-2039  25-Oct-2024 
SLC/PS/SW/22/006 
Accommodation and Intensive
Support for Young People  Catch Scotland  £1,119,195  01-Nov-2024  31-Oct-2026  31-Oct-2028  01-Nov-2024 
107

Page 108

Contract
Reference
Number
Contract Description Provider Name Contract
Value Start Date End Date Extension
Date
Contract
Award Date
SLC/PS/SW/18/001  Adult Supported Living:
phases 5 & 6 
Deafblind Scotland, 
Blue Triangle (Glasgow) Housing
Association Ltd, 
Cornerstone Community Care t/a
Cornerstone, 
Lanarkshire Care Partners, 
Mochridhe Limited 
£242,837,766  01-Mar-2020  14-Sep-2035  -  12-Dec-2024 
SLC/SW/24/056   Residential Placement (AS) at
Ochil Tower School 
Ochil Tower School  £222,450 
01-Aug-2024   31-Jul-2025   -   13-Dec-2024  
SLC/SW/23/107   Intensive Family Support
Service  Action For Children Services Ltd  £4,335,526  06-Jan-2025  05-Apr-2028  05-Apr-2030  23-Dec-2024 
SLC/SW/23/096  
Short Break and Respite
Service for Adults with
Learning Disabilities 
Sense Scotland   £2,940,197  
01-Apr-2025 
31-Mar-2027   31-Mar-2028   24-Dec-2024  
SLC/SW/25/007  
Provision of Amazon
Healthcare Devices & Support   Censis Technology Solutions Ltd   £160,000   01-Apr-2025   31-Mar-2026   -   07-Mar-2025  
SLC/SW/23/116   Adult Supported Living for
Individual Supported Person 
Enhance Living Support Services
Ltd 
£448,818   17-Mar-2025   31-Mar-2026   31-Mar-2027   18-Mar-2025   
108

Page 109

Contract extensions awarded over £50,000 in value 
Contract Reference
Number Contract Description Provider Name Contract
Value
Extension
Value Start Date End Date Extension
Date
SLC/PS/SW/22/014 
Supply of Homecare Uniforms -
Tunics & Trousers 
Haven Products Ltd   £270,000   £90,000   31-Dec-2024   30-Dec-2025   23-Dec-2024  
SLC/PS/SW/23/104 
Child Poverty Practice Accelerator
Fund (CPAF) 
Covey Befriending   £79,897   £19,974   01-Feb-2024  
26-Apr-2025 
13-Jan-2025  
SLC/PS/SW/19/003/B 
Adult and Young Peoples Carer
Service 
Action For Children Services
Ltd 
£5,294,427   £272,185   01-Jul-2025  
30-Jun-2026 
01-Feb-2025  
SLC/PS/SW/19/003/A 
Adult and Young Peoples Carer
Service 
Lanarkshire Carers Centre Ltd   £5,294,427   £792,227   01-Jul-2020   31-May-2026   04-Feb-2025  
SLC/SW/23/119  Care at Home Services 
Homecare Scotland Care
Services Ltd 
£177,254   £34,680   20-Feb-2023   30-Sep-2025   27-Mar-2025   
109

Page 110

110