Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 19 June 2023 
Dear Councillor 
Risk and Audit Scrutiny Committee 
The Members listed below are requested to attend a meeting of the Committee to be held as
follows:- 
Date:  Tuesday, 27 June 2023
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Elaine McDougall (Chair), Mary Donnelly (Depute Chair), Mathew Buchanan, Alistair Fulton,
Ross Gowland, Celine Handibode, Cal Johnston-Dempsey, Susan Kerr, Richard Lockhart, 
Substitutes
Colin Dewar, Gavin Keatt, Monique McAdams, Helen Toner
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Risk and Audit Scrutiny Committee held on
23 May 2023 submitted for approval as a correct record.  (Copy attached) 
5 - 10 
Item(s) for Decision 
3 Internal Audit Annual Assurance Report 2022/2023
Report dated 12 June 2023 by the Audit and Compliance Manager,
Finance and Corporate Resources.  (Copy attached) 
11 - 24 
4 Annual Governance Statement for 2022/2023 and Significant
Governance Areas Quarter 4 Progress Report
Report dated 9 June 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
25 - 56 
Item(s) for Noting 
5 Unaudited Annual Accounts 2022/2023
Report dated 19 June 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
57 - 214 
6 Internal Audit Activity as at 9 June 2023
Report dated 9 June 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
215 - 222 
7 2022 National Fraud Initiative Exercise
Report dated 12 June 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
223 - 232 
8 Audit Scotland Report Resourcing the benefit service – A Thematic
Study
Report dated 1 June 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
233 - 238 
9 Forward Programme for Future Meetings
Report dated 2 June 2023 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
239 - 242 
Urgent Business 
10  Urgent Business
Any other items of business which the Chair decides are urgent. 
Clerk Name: Elizabeth-Anne McGonigle
2

Page 3

Clerk Telephone: 07385403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

RISK AND AUDIT SCRUTINY COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 23 May 2023 
Chair:
Councillor Elaine McDougall 
Councillors Present:
Councillor Mary Donnelly, Councillor Alistair Fulton, Councillor Ross Gowland, Councillor Cal
Johnston-Dempsey, Councillor Susan Kerr, Councillor Richard Lockhart, Councillor Gavin Keatt
(substitute for Councillor Mathew Buchanan) 
Councillors' Apologies:
Councillor Mathew Buchanan, Councillor Celine Handibode 
Attending:
Finance and Corporate Resources
Y Douglas, Audit and Compliance Manager; E-A McGonigle, Administration Officer; A Norris,
Administration Assistant; J Taylor, Head of Finance (Strategy) 
Also Attending:
Audit Scotland
J Boyd and M Ferris, External Auditors 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Risk and Audit Scrutiny Committee held on 7 March 2023
were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Review of Counter Fraud, Bribery and Corruption Policy 
A report dated 5 May 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on the revised Counter Fraud, Bribery and Corruption Policy, together with
arrangements for communication of the Policy and a refreshed approach to training. 
The Council’s Counter Fraud Policy had been in place for a significant period of time and had
undergone a series of revisions.  The requirement to amend the Policy again to reflect further
legislative changes had provided the opportunity to amalgamate various elements of the
Council’s Fraud Policy into a single document.  The revised Policy, which was attached as an
appendix to the report, remained mainly unchanged. 
Details were provided on the areas covered by the Policy including:- 
 roles and responsibilities of employees and managers
 fraud detection, investigation and reporting
2
5

Page 6

 recovery and sanctions 
The overarching message was one of a commitment to preventing fraud and corruption
through:- 
 robust financial and operational controls 
 guarding against the threat of Serious and Organised Crime
 developing a counter-fraud culture 
The Council would, where justified, take appropriate disciplinary and legal action in all proven
cases and good governance would be demonstrated by reporting anti-fraud activity to this
Committee. 
The summary document ‘Fraud Whistle Blowing for Third Parties’ was attached as Appendix 1
to the Policy and detailed how members of the public could raise concerns and how the Council
would respond.  Separately, appended to the Policy, was the proposed approach the Council
would adopt to Due Diligence and Anti-Tax Evasion Detection.  The Policy, and related
appendices, would be uploaded to the Council’s intranet and the ‘Fraud Whistle Blowing for
Third Parties’ summary document would be uploaded to the Council’s internet. 
A Learn on Line fraud course had previously been available to employees.  The content of that
course was high level and generic to ensure it was applicable to all Council Services.  It was
proposed that instead of regularly reviewing and updating the content of this online course, fraud
awareness would now be raised through periodic bulletins, ‘toolbox’ talks and Executive Director
briefings.  This would provide flexibility to allow for more topical issues to be covered. 
The Audit and Compliance Manager responded to a member’s question in relation to fraud
awareness training, specifically:- 
 who was trained in fraud awareness and did that include elected members
 was fraud awareness training mandatory and were records of completion kept 
The Committee decided: 
(1) that the Counter Fraud, Bribery and Corruption Policy be approved; 
(2) that it be noted that the Policy and appendices be uploaded to the Council’s intranet and;
that separately, the summary document ‘Fraud Whistle Blowing for Third Parties’ as
detailed at Appendix 1 to the Policy, be uploaded to the Council’s internet; and 
(3) that the refreshed training approach, as set out at section 5.3 of the report, be noted. 
[Reference:  Minutes of the Executive Committee of 22 September 2010 (Paragraph 7)] 
4 Internal Audit Activity as at 5 May 2023 
A report dated 5 May 2023 by the Executive Director (Finance and Corporate Resources) was
submitted providing an update:- 
 on work completed by Internal Audit during the period 18 February to 5 May 2023
 on progress with the external assessment of the Council’s internal audit function’s level of
compliance with the Public Sector Internal Audit Standards (PSAIS)
6

Page 7

Findings from internal audit assignments were reported to this Committee throughout the year
and the last progress report was considered by this Committee on 7 March 2023.  Key
performance indicators, which reflected quality, on time and within budget for the 2022/2023
Internal Audit Plan would be presented in the 2022/2023 Internal Audit Assurance report at the
27 June 2023 meeting of the Committee.  It was anticipated that all targets would be met. 
As at 5 May 2023, 94% of the 2022/2023 Audit Plan was complete with 3 assignments still being
progressed at that date.  Assignments completed in the period 18 February 2023 to 5 May 2023,
together with a summary of overall assurances, were detailed in Appendix 1 to the report.   
The Council formed part of the Glasgow City Region City Deal which funded a range of capital
projects within South Lanarkshire.  At the May 2023 meeting of the Cabinet, audit reports had
been presented on:- 
 the Internal Audit Plan for 2023/2024
 Change Control and Contract Management (Phase 2)
 Project Procurement Strategies
 Follow Up Audit work 
Updates were also provided on:- 
 the self-assessment for the PSIAS external review which had been passed to East Lothian
Council.  The review was in progress and the outcome of the exercise would be reported
to the Committee in June 2023
 meetings of the Chief Internal Auditors’ Group which had provided an opportunity to share
best practice and attend presentations on topical issues.  A copy of the Chief Internal
Auditors’ Group 2022/2023 Annual Report was provided at Appendix 2 to the report
 progress against the Audit Strategy which was a requirement of the PSIAS.  Delivery of
the 2022/2023 Strategy had been evidenced by the completion of the Internal Audit Plan in
year, and monitored during the year by performance indicators which were regularly
reported to the Committee   
The Audit and Compliance Manager responded to members’ questions on various aspects of
the report. 
The Committee decided: that progress be noted. 
[Reference:  Minutes of 7 March 2023 (Paragraph 5)] 
5 Annual Audit Plan 2022/2023 
The Committee considered the South Lanarkshire Council Audit Plan for 2022/2023 submitted
by Audit Scotland, the Council’s External Auditor. 
The Plan set out the audit work necessary to allow Audit Scotland to provide an independent
auditor’s report and meet the wider scope requirements of public sector audit which included
assessing arrangements for:- 
 financial management
 financial sustainability
 vision, leadership and governance
 use of resources to improve outcomes
7

Page 8

The planned work on the wider scope responsibilities was risk based and proportionate and in
addition to local risks, challenges which were impacting the whole public sector would be
considered. In 2022/2023, climate change and responding to cyber security threats would be
considered. 
The Plan was structured around the following areas:- 
 annual accounts audit planning
 wider scope and best value
 reporting arrangements, timetable and audit fee
 other matters 
Details were given on key aspects of those areas. 
COVID-19 had continued to impact on the conduct and timeliness of the audit and it was
recognised that it was in the best interests of public accountability to get the reporting of audited
accounts back to pre-pandemic timelines.  Ways of working more efficiently to expedite the
2022/2023 audits whilst maintaining high standards of quality were being identified.  A hybrid
approach would be taken for the 2022/2023 audit which would include a blend of onsite and
remote working. 
Audit Scotland had been appointed as the external auditor for the Council for the period
2022/2023 to 2026/2027 inclusive, and a biography of the audit team was provided at Appendix
1 of the report. 
The Audit Director responded to a member’s questions in relation to the audit fees and the 2
new audit quality standards. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 7 March 2023 (Paragraph 7)] 
6 Audit Scotland – Financial Bulletin 2021/2022 
A report dated 4 May 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on the Audit Scotland report entitled ‘Local government in Scotland: Financial bulletin
2021/2022’ which had been published in January 2023. 
The report had been divided into 2 parts:- 
 councils’ financial summary 2021/2022
 councils’ financial outlook 
The key messages from the Audit Scotland report were detailed, together with an assessment of
the position in South Lanarkshire Council. 
The Committee decided: 
(1) that the key messages and recommendations contained in the Audit Scotland report
entitled 'Financial bulletin 2020/2021', as detailed in sections 4 and 5 of the report, be
noted; and
8

Page 9

(2) that the commentary on the Council’s position, as included in the Audit Scotland report and
as detailed in section 6 of the report, be noted. 
[Reference:  Minutes of 22 June 2022 (Paragraph 6)] 
7 Financial Resources Scrutiny Forum Activity 
A report dated 5 April 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on reports considered by the Financial Resources Scrutiny Forum in the period from
September 2022 to April 2023. 
A report on the business considered by the Financial Resources Scrutiny Forum would continue
to be submitted to the Risk and Audit Scrutiny Committee on an annual basis. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 22 June 2022 (Paragraph 7)] 
8 Forward Programme for Future Meetings 
A report dated 27 April 2023 by the Executive Director (Finance and Corporate Resources) was
submitted on the outline forward programme for the meetings of the Risk and Audit Scrutiny
Committee to 26 March 2024. 
As part of future arrangements, members were invited to suggest topics for inclusion in the
Committee’s forward programme. 
The Committee decided: that the outline forward programme for the meetings of the
Risk and Audit Scrutiny Committee to 26 March 2024 be
noted. 
[Reference:  Minutes of 7 March 2022 (Paragraph 8)] 
9 Urgent Business 
There were no items of urgent business. 
9

Page 10

10

Page 11

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee 
Date of Meeting: 27 June 2023
Report by: Audit and Compliance Manager (Finance and
Corporate Resources)  
Subject: Internal Audit Annual Assurance Report 2022/2023 
1. Purpose of Report
1.1 The purpose of the report is to:- 
 report on the progress and performance of Internal Audit and to provide an
independent audit opinion on the adequacy and effectiveness of the Council’s
framework of governance, risk management and control arrangements for the year
ended 31 March 2023 
2. Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):- 
(1) that Internal Audit’s performance be noted;  
(2) that the overall findings from internal audit work be noted, and that it be
approved that these will inform the Council’s 2022/2023 governance statement;
and
(3) that the level of assurance be noted. 
3. Background
3.1 The internal audit service is delivered within South Lanarkshire Council (SLC) within
the context of the Public Sector Internal Audit Standards (PSIAS) (revised 1 April
2017), compliance with which is mandatory under Section 95 of the Local Government
(Scotland Act) 1973.  This sets out a series of standards to ensure a professional,
independent and objective internal audit service is delivered that supports good
governance within an organisation.     
3.2 PSIAS requires that a Quality Assurance and Improvement Programme (QAIP) is
developed to provide assurance that internal activity is conducted in accordance with
an Internal Audit Charter, that it operates in an efficient and effective manner and that
it is perceived to be adding value and improving operations.  The self-assessment
exercise undertaken in 2022/2023 has confirmed that South Lanarkshire Council’s
internal audit function continues to generally conform to the Public Sector Internal
Audit Standards.  This self-assessed position is currently being review by an
independent assessor and will complete in June 2023. No significant areas of non-
compliance have been identified to date and the assessment is anticipated to conclude
that the section continues to generally conform with the requirements set out in PSIAS.       
3.3 The primary objective of Internal Audit is to evaluate and improve the effectiveness of
governance, risk management and control processes.  The purpose of this report is to
3
11

Page 12

provide an independent audit opinion on the overall adequacy and effectiveness of
SLC’s framework of governance, risk management and control arrangements based
on audit work undertaken in 2022/2023.   
3.4 The internal audit approach in 2022/2023 has sought to:- 
 provide real-time advice and insight in the development of new systems and
controls
 ensure that core internal audit work remains risk-based and relevant and
continues to inform longer term planning around risks
 regularly report activity to the Council’s Risk and Audit Scrutiny Committee   
3.5  Significant time in the year has been committed to Oracle Fusion, a major system
upgrade. Where internal audit staff are diverted into operational roles, declaration of
interest processes will address any impairment to independence and objectivity. 
3.6  In 2022/2023, Internal Audit has set out to enhance and protect organisational value
by providing risk-based and objective assurance, advice and insight.  Throughout the
year, Internal Audit has reported to the Council’s Risk and Audit Scrutiny Committee
(RASC).  Reports to the RASC have detailed the findings from each finalised
assignment in conjunction with information in relation to Internal Audit activity’s
purpose, authority, responsibility and performance relative to the 2022/2023 Audit
Plan.  
4. Link to Council’s Objectives and Top Risks
4.1 As a function, Internal Audit seeks to link to the Council’s Connect Value of
‘accountable, effective, efficient and transparent‘.   
4.2 In addition to Connect, assignments within the Audit Plan each year are linked to the
Council’s top risks and to wider strategic risks to ensure that work has the correct focus
and is directed to areas where an independent review would add greatest value.  The
2022/2023 Audit Plan was presented to RASC on 26 January 2022 with an update on
27 September 2022. 
4.3 The Plans could not cover all of the organisation’s top risks.  Instead, these Plans
prioritised audits and tasks that reviewed the key, strategic risks to the Council’s
operations in 2022/2023. 
5. Internal Audit Workload and Performance 
2022/2023 Workload 
5.1 The actual number of audit days delivered in 2022/2023 was 1,126 days which was
102% of the target planned days in the year.  94% of the Audit Plan was delivered by
30 April 2023.  The three outstanding audit assignments at this date related to a special
investigation and two routine assignments covering petty cash and purchase cards. 
Total No. Jobs
Planned assignments  48
Reports completed to draft 451   
Table One - Internal Audit workload analysis for 2021/2022 
1 This includes 2 routine assignments where audit testing has been completed and a level of review has been
undertaken.  None of the findings reviewed to date have highlighted significant issues that require mention in
this Annual Report. It also includes 1 special investigation which is ongoing and formal findings are not yet
available.
12

Page 13

5.2 Each of the audits undertaken in the year were conducted in conformance with PSIAS. 
The standards require the Council’s internal audit function to demonstrate
engagement with clients to ensure the Audit Plan is agreed at the outset of the year
and continues to address known and emerging risks as the year progresses.  The
scope of the 2022/2023 Audit Plan was amended to reflect the significant resources
committed to the implementation of Oracle Fusion.  Through this, the internal audit
function delivered a service that aligned to the strategies, objectives, and risks of the
organisation.   
5.3 Internal Audit continue to sit on a variety of internal working groups.  This participation
provides assurance that the implementation of internal controls has been a key
consideration in the development of new processes or revisions to existing practices
and that these embed the key internal controls of segregation of duties, authorisation,
reconciliation and monitoring.   
2022/2023 Performance 
5.4 A summary of key Internal Audit performance statistics is included at Appendix 1. 
These detail performance in areas that are relevant to the delivery of an effective and
efficient internal audit service.  Performance indicators were reported to the Committee
during the year.   3 from 5 indicators exceeded targets with the other 2 indicators falling
marginally behind target. 
5.5 The Committee is asked to note Internal Audit’s workload and performance in the year
to 31 March 2023 and that both remain sufficient to support the audit opinion
expressed within this report. 
6. Basis of Audit Opinion  
6.1 The opinion expressed within this report (see 7.4) has been based, primarily, on the
output from the 2022/2023 Internal Audit Plan as well as reports that have been issued
by the Council’s external auditors, regulators and inspectors during the year.     
Area of Assurance – Governance 
6.2 The first area of assurance is in relation to the Council’s governance arrangements
and the findings that support the overall assessment of these are detailed in
paragraphs 6.3 to 6.11. 
6.3 Reinforcing Conflict of interest processes remains important.  Processes are fit
for purpose and provide clear guidance to Managers around their responsibility to
monitor ongoing compliance.  This has been embedded within annual governance
checks and further opportunities are being explored to reinforce this good
governance policy.  In conjunction with this, there has been a review of the
Council’s counter-fraud policy.  The requirement to amend this policy to reflect
further legislative changes provided the opportunity to amalgamate various
elements of the Council’s fraud policy into a single document and to further refine
the content. 
6.4 The approach to raising fraud awareness was also reviewed during the year and plans
are being developed to utilise periodic bulletins, ‘tool box talks’ and Executive Director
briefings to convey key messages to target groups of employees. 
6.5 Aside from these assignments, routine governance tasks have been delivered as
required; an audit certificate for the Leader European Union rural programme has been
provided and a cross-Resource review of the 2021/2022 Director Statements of
Assurance was completed. 
13

Page 14

6.6 Good governance is also demonstrated by the timeous implementation of actions and
recommendations made by both internal and external audit and external inspectors. 
6.7 PSAIS places a responsibility for monitoring progress with the delivery of internal
audit actions on the Chief Internal Auditor to ensure that recommendations are
effectively implemented.  Relatively few Internal Audit actions fell due in 2022/2023
reflecting the impact of COVID-19 on routine audit plans in recent years.  Although
relatively few in number in 2022/2023, Council-wide, 100% of internal audit actions
were delivered on time.   This suggests that actions are, in the main, being fully and
timeously implemented.  This was checked independently by a limited programme of
formal follow-up reviews undertaken in the year.  
6.8 Audit actions also arise from external auditors and inspectors.  One such area is
internal audit activity undertaken by Glasgow City Council who act as internal auditors
for the Glasgow City Region – City Deal.  More robust arrangements have been
established to follow up specific City Deal actions and progress with implementation
is reported to the RASC as part of regular update reports.  None of the actions in year
were significant but implementation is nonetheless important to demonstrate good
governance.   
6.9 Assurance around effective governance comes also from the annual exercise that
assesses the effectiveness of the governance arrangements within South
Lanarkshire Council.   On an annual basis, an assurance mapping process is
undertaken in conjunction with the Good Governance Group to inform the Council’s
Annual Governance Statement.  Within individual Director’s Statement of Assurance,
Resources have indicated a commitment to deliver against the recommendations of
external auditors and other external review agencies and report progress to
Committees and Boards.   
6.10 The Council’s External Auditors undertook the 2021/2022 financial audit during
2022/2023 and provided an unqualified opinion in relation to the Council’s financial
statements.  There has been no formal interim audit output for 2022/2023.  Internal
Audit have liaised with External Audit periodically throughout the year and have
collated financial year-end data. 
6.11 Audit Scotland also publish wider Public Sector reports throughout the year.  Where
appropriate, the key messages and their application to SLC are reported to
Committees.   
Area of Assurance – Risk Management
6.12 The second area of assurance is around the Council’s risk management
arrangements and the findings that support the overall assessment of these are
detailed in paragraphs 6.13 to 6.23.     
6.13 Work started in 2022/2023 and will continue into 2023/2024 to categorise controls that
mitigate the Council’s top risks using the Institute of Internal Auditors ‘three lines of
defence’ methodology. This framework recognises that different parts and levels of
the organisation play complementary roles in risk management.  Controls that form
the first line of defence sit at a Service level with the second line of defence being
those that ‘oversee’ (Corporate Management Team, Committees etc).  The final level
is that of independent assurance provided by internal and external audit or external
inspectors.  Good risk management will evidence controls across all ‘lines’.  An initial
analysis of controls has been completed and will be shared with Risk Sponsors to
assist in the annual review of top risks.  Gaps in controls will be considered for
inclusion in the 2024/2025 Internal Audit Plan.
14

Page 15

6.14 Cyber Security remains a significant risk with an attack possible despite the controls
in place.  Experience of other organisation’s attacks has highlighted that there is
always heightened vulnerabilities around employees and legacy systems.  Levels of
awareness is raised via briefings and Learn On Lines but there would be value in
making all relevant courses mandatory.  Assurances have been provided that damage
could be contained were an attack to happen and that there would be sufficient back-
up to restore systems in such an event.  Despite these assurances there would
inevitably be disruption to operations. 
6.15 Internal Audit have been advised that there is a protocol in place that could be used
to manage an incident both from a technical perspective and wider management
actions. This protocol sets out how the team will communicate if the Council’s network
was down and plans are in place to review this protocol every year and to “re-test”
every three years.  The appropriateness of this timeframe needs to be considered
within the context of the pace of change in the cyber landscape. 
6.16 In the event that all network data was lost, it would be helpful to have a definitive list
of what would be recovered first in terms of priority. ‘Emergency” (can’t be stopped)
services are known but have not necessarily been prioritised.  Further refinement of
the plans, in this context, may be beneficial. 
6.17 Work is required to update service business continuity plans and this is currently being
facilitated by the SLC Resilience Team. From a cyber perspective, these service level
plans need to consider which Services cannot be ‘paused’, and, for these, what back-
up processes can be initiated quickly to continue service provision.  Specific risks
should be highlighted in Resource risk registers recognising the significance of the risk
of lost access to network files/systems on core areas of service provision in the event
of an attack. 
6.18 This report is currently being finalised and audit output will be reported to the
Committee in 2023/2024. 
6.19 Aside from emerging risks, the 2022/2023 Audit Plan also included time to review
governance, risk management and detailed short and medium term planning around
sustainability.  Previous annual reports have recognised both the progress and
challenges of delivering the sustainability agenda.  We also looked at the longer term
route map to achieve net zero targets.  Supporting this are decision making processes
and tools along with collaboration and community empowerment that will need to be
harnessed to delivery long term goals.  The overall picture is one of clear aspirations
and commitment, but residual risks scores reflect the challenges and remain very high
corporately (and increasing in some Resource risk registers) even despite the level of
mitigations that are being put in place. Actions are high level and are across the full
span of the sustainability agenda. Over time, how to fund will remain one of the most
significant risks.  A 5-year action plan is now in place to support the strategy with SLC
producing annual plans to support delivery.  All actions should be tracked.   
6.20 Key assurances are around a clear assessment of the challenges that are reflected in
risk registers.  Plans, both short and long term, set targets that will assist in meeting
the overall objective that should be translated within local Service Plans. There are
areas where work is still required such as the measuring of indirect emissions and
addressing the practical and logistical challenges that will hinder delivery.  Working in
partnership will be key to address issues around fully funding the agenda through to
completion. Underlying all of this will be the need to embed cultural change that puts
sustainability and carbon/waste reduction at the forefront of all decision making.
15

Page 16

6.21 From an Internal Audit perspective, there is a commitment to continue our overview of
the risks, mitigation and progress in delivering the sustainability agenda. 
6.22 The Council’s top risk register review in 2022 included a new risk in relation to
Community Wealth Building (CWB) specifically in relation to the Strategy not being
delivered. Recognising that CWB would signal a fundamental shift in the council’s
approach, a risk register was developed and approved by the CWB Commission on
27 October 2021. Risks were recorded against each of the five pillars noted within the
strategy.  Internal Audit obtained a copy of the CWB risk register and matched this to
the Council Wide Risk register.   Following a review of the CWB Risk Control Plan the
relevant areas, risks and controls were noted as being assigned to key officers who
had responsibility to deliver actions across each of the 5 strategy areas.  Evidence
was obtained that these control actions are being progressed. 
6.23 Other routine tasks continued throughout the year, such as a review of Resource
Fraud Risk Registers with Internal Audit satisfied that there was evidence of in-year
evaluation and update by all Resources. 
Area of Assurance – Internal Control 
6.24 Robust internal controls are important, irrespective of the activity or process.  Their
effective implementation supports delivery of vital Council services to people and
businesses in South Lanarkshire.  The main areas of assurance around the Council’s
internal control arrangements are detailed in paragraphs 6.25 to 6.46. 
6.25 Around 25% of the function’s resources in 2022/2023 have been utilised to support
the implementation of Oracle Fusion, a cloud based human resources and financial
management system.  Over the lifetime of the project, Internal Audit will seek to
provide assurance around:- 
 business process readiness and solution design
 program management and governance
 data conversion and governance
 organisation change enablement
 the testing strategy
 reporting and analytics
 security and internal controls
 IT and business operational readiness 
6.26 In 2022/2023, Internal Audit have focused on the first 2 areas (within Phase 1) with
further input to reporting and internal control considerations.  In 2023/2024 this has
moved to data migration and validation, organisational readiness and a programme of
testing of key processes. 
6.27   In terms of initial readiness and solution design, Internal Audit sought evidence of
an implementation plan, definition of roles and responsibilities and a process to allow
early identification of issues to mitigate the risk of an extended period of system design
changes which would then impact on the ability of the project to deliver the  anticipated
efficiencies and transformational change. 
6.28 A standard implementation model is being utilised (ADOPT Advisory; Design;
Orchestrate; Prepare; Transition).  Initial design concepts were developed by senior
SLC staff at the outset of the project within the standard Oracle Fusion build
framework. Fusion functionality was demonstrated at High Level Advisory sessions to
the Functional teams for HR, Finance and Procurement.  Process maps were
16

Page 17

developed and then use for Conference Room Pilots (CRP).  Issues identified at CRP
sessions were incorporated into GAID (Assumptions, Issues and Dependencies) logs
and discussed at daily and weekly functional meetings. 
6.29 As the design evolved, Configuration Workbooks have been prepared, setting out the
parameters for the build.  A scope of work document was drawn up at the start of the
project setting out a series of milestones that would release stage payments. 
6.30 During the design phase, CRPs have led to the creation of Solution Design Documents
(SDD), which outlined the various process, flow charts and system descriptions. Key
User Training (KUT) sessions have been completed for some functions alongside KUT
manuals. At date of writing this report, all but one SDD had been signed off and just
over 40% of KUT manuals were complete.  All KUT sessions were complete albeit
some may require to be repeated.  Work in all of these areas is profiled to end early
June. 
6.31 Any delays in the various stages of project implementation ultimately impact on the go
live date.  The PRB continue to have oversight of all elements. 
6.32 Effective project management also requires roles and responsibilities to be defined
within an overall program governance structure to allow effective and timely decision-
making.  Ownership and accountability for all key components of the project is needed
to identify and resolve critical risks across all functional areas. 
6.33 The process for design leadership and governance is well established.  This has been
challenging given the high turnover of staff with the Business Partner and a level of
turnover of key personnel within South Lanarkshire Council. Internal Audit is
represented on the Steering Committee and the Project Review Board and has
attended these meetings alongside all key stakeholders and partners. 
6.34 There are regular meetings of both the Board and Steering Group, with agendas,
presentations and actions being minuted.  These meetings are attended by the
Business Partner with a detailed progress update being presented at each meeting by
all functional leads.  Detailed plans and revisions have been developed to respond to
known challenges and risks to the planned go live date and the project will require
close management of the significant volume of tasks and the associated timeline
through to this date. 
6.35 Phase 2, which includes additional Human Resources modules has a later go live
date. Phase 2 now has its own plan with separate meetings to progress through to
implementation. 
6.36 Internal Audit has sought to ensure that processes incorporate key internal controls
and that off-system or manual workarounds are minimised.  The higher degree of
automation will bring benefits but key internal controls must be embedded.  Internal
Audit is currently reviewing the availability of specific reports, to obtain assurance that,
in the first instance access to reports are appropriately restricted to those with a
business need.   
6.37 Despite having a focus in 2022/2023 on project governance, risk and internal controls,
Internal Audit continues to also assist through the provision of core data, process
overviews and input to design solutions.  Challenges around resourcing a project of
this magnitude exist within Internal Audit and are similarly reflected in Council Services
leading on implementation.  The project is currently within a critical phase and Internal
17

Page 18

Audit will continue to re-assess resources to ensure that they effectively contribute
through to go live. 
6.38 Preparatory work for a review of the Equity Strategy and for Additional Support
Needs transport was included in the 2022/2023 Audit Plan. A questionnaire was sent
to a sample of schools to assess the high-level governance arrangements in place
around Pupil Equity Funding (PEF).  Positive feedback from this questionnaire
suggests that there is comprehensive guidance and regular reporting and engagement
with schools over the allocation and spend of PEF monies.  Schools indicated that a
documented audit trail of spend is being maintained.  Follow up testing within schools
will now be undertaken in 2023/2024. 
6.39 In a similar manner, research around ASN transport was undertaken in 2023/2024. 
The was to assess progress with previous actions and collate background data to
inform audit testing in 2023/2024.  This overview indicates that systems are in place
to source, administer and manage the delivery of ASN transport and that there had
been progress in addressing previously identified areas of action. Follow up testing
will now be undertaken in 2023/2024. 
6.40 A review of the procedures for dispensing medication with a Social Work facility
was undertaken in 2022/2023.  Internal Audit completed some ‘walk through’ testing
and, from a small sample reviewed, were satisfied that all actions had been
implemented with the exception of one where work was still ongoing.  It is important
that the level of checking and standard of recording is continued to ensure good
governance and to allow any future discrepancies to be fully investigated. 
6.41 A continuing overview of Self Directed Support (SDS) arrangements in the year has
concluded that detailed procedures and supporting documentation are in place that
are based on Scottish Government Legislation and COSLA guidance.  These are
available to all employees.  Management information was considered to be informative
and useful albeit not in a consistent format across all Services.  It was confirmed that
one of the two actions from the previous SDS audit were complete with the outstanding
action being impacted by the commitments of the training and development team
involved in implementing the new Social Work system.  
6.42 Advice and guidance has been provided in the year, including around the extended
use of Purchase Cards to ensure that key internal controls are in place. Routine audit
testing around Petty Cash and Purchase Cards are pending final review and will now
be concluded early in 2023/2024. 
6.43 Routine control work continued in the year through CCM analysis that was used to
inform ‘intelligent’ audit sampling and to provide detailed data to External Audit for the
purposes of the Council’s financial year-end audit.   
6.44 Investigative work was a relatively small element of the 2022/2023 Audit Plan but there
has been an increase in the number of whistle-blowing concerns compared to recent
pandemic years.  The nature of these concerns are wide ranging and each of these
were investigated in line with established fraud procedures and reflective of the
Council’s zero tolerance approach to fraud. One of these assignments remain open
18

Page 19

as at 31 March 2023 with work ongoing to conclude.  A detailed report on fraud
statistics will be presented separately to the Committee.   
6.45 Internal Audit has also monitored fraud alerts through internal and external sources
and disseminated information as appropriate.  In 2022/2023 these have continued to
relate to ad hoc issues and have been shared with Council Resources as appropriate.     
6.46 In 2022/2023, data was uploaded for the next National Fraud Initiative (NFI)
exercise with matches returned in 2023/2024 for investigation. A detailed report on
matches and a proposed approach to investigating will be presented separately to the
Committee.  
7. Summary of overall assurance and audit opinion 
7.1 Adequate arrangements exist within SLC to escalate any concerns the Audit and
Compliance Manager may have in relation to the level of risk accepted by
management or SLC.   
7.2 Internal control has remained, primarily, a management responsibility to ensure that
the Council conducts its business in a manner that has due regard to the principles of
good governance.  The presence of an internal audit function does not negate the
importance of effective internal controls. Internal Audit cannot be expected to give total
assurance that control weaknesses or irregularities do not exist.  The audit opinion is
based upon the audit work undertaken during the year and knowledge of the Council’s
wider governance, risk management and control arrangements. 
7.3 Many significant controls are imbedded within systems and these have been tested
throughout the year by a programme of internal and external audit testing.  Key
controls such as adherence to proper processes and procedures, application of
management checks and robust monitoring are generally vested in people and,
therefore, remain an area of higher inherent risk.  These processes continue to be
subject to change and all reasonable steps have been taken to gather sufficient
evidence to express an audit opinion for this year.   
7.4 In 2022/2023, the Internal Audit opinion is that, overall, reasonable assurance
can be placed on the adequacy and effectiveness of the Council’s framework of
governance, risk management and control arrangements for the year ending 31
March 2023. 
7.5 The Committee is asked to note the above findings and approve their inclusion in the
Council’s Annual Governance Statement.  A signed Annual Internal Statement of
Assurance is included at Appendix 2 based on the view of the Council’s own internal
audit function. 
8. Employee implications 
8.1 The Internal Audit service in 2022/2023 was delivered by a team of ten.  Of the team
of ten, all are fully or partly qualified through either the Chartered Institute of Internal
Auditors or one of the Consultative Committee of Accountancy Bodies. 
8.2 Informal feedback received in relation to audit assignments is used to highlight areas
for training and development.  These are progressed on an individual basis as part of
the performance development review process.  Best practice information is shared
and learning points discussed throughout the year.
19

Page 20

9. Financial implications 
9.1 Audit and Compliance Services, during 2022/2023, marginally overspent against their
allocated budget. 
10. Future years
10.1 The 2022/2023 Internal Audit Plan was the first audit plan since 2019/2020 where the
proposed plan of work did not anticipate the delivery of COVID 19 tasks.  These tasks,
however, remained with residual reporting requirements to HMRC of grants disbursed
in previous tax years. 
10.2 Significant pressures remain as public services re-set with processes continuing to
evolve.  This momentum will continue with the implementation of Oracle Fusion. 
Investing time to fully develop data analytical tools has proved important but must be
considered alongside the improved functionality of new systems.  This will require the
upskilling of the wider Internal Audit team and for approaches to evolve to remain
relevant and deliver value-added output. 
11. Climate Change, Sustainability and Environmental Implications
11.1 There are no implications for climate change, sustainability or the environment in terms
of the information contained within this report.  
12. Other implications 
12.1 Each audit assignment seeks to identify efficiencies and report as part of the audit
opinion where appropriate.  In practice this often translates suggesting a more efficient
way in which to deliver services.  Opportunities to identify ‘cash’ savings are becoming
less frequent in an environment of growing financial constraints.  From Resources
perspective, much of the ‘value added’ element of an internal audit service is linked to
the function’s ability to provide advice and guidance.  In addition, there has been a
growing focus on the content of action plans to ensure that these effect required
improvements.  This is particularly important in areas where issues are more
significant.   
12.2 Responding to Services’ requests for assistance and participation in internal working
groups is accommodated within the Plan and through contingency time.  This aligns
to the PSIAS requirement to deliver an effective internal audit service.   
12.3 There are no sustainability issues in terms of the information contained in this report. 
13. Equality impact assessments and consultation arrangements 
13.1 There is no requirement to carry out an impact assessment in terms of the information
contained within this report.   
13.2 Resource Heads of Service are consulted in advance of every planned audit
assignment and following completion of fieldwork. Resources and elected members
are also consulted during preparation of the annual audit plan. 
Yvonne Douglas 
Audit and Compliance Manager 
12 June 2023 
20

Page 21

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Risk and Audit Scrutiny Committee, 2022/2023 Internal Audit Plan - 26 January 2022
 Risk and Audit Scrutiny Committee, 2022/2023 Internal Audit Plan - 27 September 2022 
List of Background Papers
 2022/2023 progress reports to the Risk and Audit Scrutiny Committee
 Figtree statistical and assurance and time recording extracts
 Public Sector Internal Audit Standards (revised)
 Fraud statistics and NFI updates 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Yvonne Douglas, Audit and Compliance Manager
Ext:-  2618  (Tel:  01698 452618)
E-mail:-  yvonne.douglas@southlanarkshire.gov.uk 
21

Page 22

Internal Audit section performance during 2022/2023          Appendix 1 
Performance Indicator 2022/2023 Target  2022/2023 2021/2022 2020/2021
Delivery of planned audit days 100%  102% 104% 96%
Completion of plan to draft report stage  100%   94% 92% 88%
Completed assignments delivered within budget 80%   79% 87% 75%
Draft reports issued within 42 days of fieldwork completed 80%   100% 100% 94%
Productive time 80%   80% 82% 84% 
22

Page 23

Appendix 2
To the members of South Lanarkshire Council, the Chief Executive and Executive
Directors
As Audit and Compliance Manager of South Lanarkshire Council, I am pleased to present
my annual statement and report on the adequacy and effectiveness of the governance, risk
management and internal control systems of the Council for the year ended 31 March 2023.
Respective responsibilities of management and internal auditors in relation to
governance, risk management and internal control
It is the responsibility of the Council’s senior management to establish appropriate and
sound systems of governance, risk management and internal control and to monitor the
continuing effectiveness of these systems. 
It is the responsibility of the Audit and Compliance Manager to provide an independent
opinion on the adequacy and effectiveness of the governance, risk management and
internal control systems of the Council. The Audit and Compliance Manager cannot be
expected to give total assurance that control weaknesses or irregularities do not exist but
can form an opinion based on work undertaken during the year and knowledge of control
systems. 
The Council’s framework of governance, risk management and internal controls 
South Lanarkshire Council has a responsibility to ensure its business is conducted in
accordance with legislation and proper standards and adheres to and works within a
framework of internal values and external principles and standards. 
The governance framework comprises the systems and processes, culture and values by
which the Council is directed and controlled and how it accounts to communities.  It enables
the Council to monitor the achievement of its strategic objectives and to consider whether
those objectives have led to the delivery of appropriate services and value for money. 
The system of internal control is a significant part of that framework and is designed to
manage risk to a reasonable level.  It cannot eliminate all risk of failure to achieve policies,
aims and objectives and, therefore, only provides reasonable and not absolute assurance
of effectiveness.  The system of internal control is based on an ongoing process designed
to identify and prioritise the risks that would prevent the achievement of South Lanarkshire
Council’s policies, aims and objectives, to evaluate the likelihood and potential impact of
those risks being realised, and to manage them efficiently, effectively and economically. 
The work of Internal Audit 
Internal Audit is an independent and objective assurance function established by the
Council to review its governance, risk management and internal control arrangements. It
objectively examines, evaluates and reports on the adequacy of these arrangements as a
contribution to general governance arrangements and more specifically the proper,
economic, efficient and effective use of resources. 
The Internal Audit Service operated in accordance with the Public Sector Internal Audit
Standards (PSAIS) (revised 2017) throughout 2022/2023.  An external assessment of the
extent of compliance is in progress as part of the Quality Assurance and Improvement
Programme.  This assessment has not identified any significant areas of non-compliance
and the section is anticipated to continue to generally conform with the requirements set out
in PSIAS.     
23

Page 24

The section undertakes an annual programme of work approved by the Risk and Audit
Scrutiny Committee.  All plans are based on a formal risk evaluation process, which reflects
agreed and emerging risks and changes within the Council and is subject to periodic review
throughout the year. 
All internal audit reports identifying risks, areas for improvement and/or non-compliance with
expected controls are brought to the attention of management and include appropriate
recommendations and agreed action plans.  It is management’s responsibility to ensure that
proper consideration is given to internal audit reports and that appropriate action is taken to
implement audit recommendations. 
Internal Audit ensure that management has understood agreed actions or assumed the risk
of not taking action.  A programme of informal and formal follow-up audit assignments
provides assurance around the complete and timeous implementation of audit
recommendations.  Significant matters arising from internal audit work are reported to the
Executive Director Finance and Corporate Resources and the Council’s Risk and Audit
Scrutiny Committee.
Basis of opinion 
My evaluation of the control environment relates only to South Lanarkshire Council and is
informed by a number of sources including internal audit work undertaken during 2022/2023. 
Limitation of scope 
No individual audit assignments were specifically limited in scope at the outset but scopes
have been amended to reflect the output from the initial risk and control analysis
undertaken at the start of each assignment and the resources available. 
Opinion
It is my opinion, based on the above, that overall, reasonable assurance can be placed on
the adequacy and effectiveness of the Council’s framework of governance, risk management
and control arrangements for the year ending 31 March 2023. 
Signature:- 
Yvonne Douglas BA CA        26 May 2023
24

Page 25

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 27 June 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject:  Annual Governance Statement for 2022/2023 and
Significant Governance Areas Quarter 4 Progress
Report 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the proposed Annual Governance Statement for 2022/2023, for inclusion
in the Council’s 2022/2023 Annual Accounts, following consideration and approval
by the Risk and Audit Scrutiny Committee
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendations:-
[
(1) that the Annual Governance Statement attached at Appendix 2, due to be
included in the Council’s 2022/2023 Annual Report and Statement of Accounts,
be approved; and
(2) that progress against the significant governance areas identified within the
Annual Governance Statement 2021/2022 attached at Appendix 3 be noted. 
[1recs]
3. Background
3.1. Each year the council undertakes a comprehensive review of the governance
arrangements that are required to support the council’s financial and operational
controls. The annual review of governance arrangements informs the Governance
Statement which is included within the council’s Annual Accounts. 
3.2. Good Governance is underpinned by the principles contained in the Delivering Good
Governance in Local Government and guidance for Scottish Local Authorities which
were published in December 2016. The Chartered Institute of Public Finance and
Accountancy (CIPFA) and the Society of Local Authority Chief Executives (SOLACE)
established the framework. The council’s governance assurance framework is detailed
at Appendix 1. 
3.3. To achieve good governance, the council should be able to demonstrate that its
governance structures comply with the principles contained in the CIPFA/SOLACE
framework (referred to as ‘the framework’ from here on) and should, therefore, develop
and maintain a Local Code of Governance and governance arrangements reflecting
these principles. The council’s Local Code of Corporate Governance is reviewed and
re-published annually. Compliance with the Code is reviewed as part of the Annual
Review of Governance arrangements and informs the Annual Governance Statement. 
3.4. The Good Governance Group undertakes an annual review of the council’s
governance arrangements through a programme of peer reviews and evaluations to
4
25

Page 26

share learning, best practice and ensure consistency in approach (where relevant)
across Resources. At the end of the review period, an evaluation of the governance
process is completed, and arrangements revised (where relevant) in preparation for
the next review. 
3.5. Based on good practice highlighted by CIPFA in relation to the publication of Annual
Governance Statements, a Good Governance page which provides links to relevant
reports and documents is available on the council’s website.     
3.6. The purpose of this report is to provide the Committee  with the Annual Governance
Statement which is due to be included within the council’s 2022/2023 Annual Report
and Statement of Accounts and an update on progress against the actions highlighted
as significant governance areas in the 2021/2022 Annual Governance Statement. 
4. Annual Governance Statement (AGS) 2022/2023
4.1. The Annual Governance Statement for 2022/2023 is attached at Appendix 2.
Information on the COVID-19 pandemic governance arrangements remain within 
Section 5 of the statement for this year but will be reviewed for future years. This details
the impact on the council’s governance arrangements and gives examples of the new
ways of working which have been embedded to assist service delivery as council
services  recover from the pandemic. It also reflects advice  previously given by CIPFA
which is set out at 4.2 below. 
4.2. The CIPFA guidance which was provided via a webinar that took place in February
2021 set out the impacts on governance arrangements to consider when drafting the
2020/2021 statement, the following continued to have relevance in the drafting of the
2022/2023 statement:- 
 the impact of the COVID-19 Pandemic, specifically, adaptations to reflect new
ways of working and emergency arrangements; changes to ‘business as usual’
activities; and longer-term changes to priorities, programmes, strategies, and
plans; areas for improvement and recovery
 the CIPFA Financial Management Code, specifically an overall conclusion on the
extent of compliance with the Code; and outstanding matters or areas for
improvement set out in the Governance Statement Action Plan (Section 7) 
4.3. The internal assurance opinions which are also set out in Section 6 of the Governance
Statement are as follows:- 
 It is the opinion of the Council’s Audit and Compliance Manager that, overall,
reasonable assurance can be placed on the adequacy and effectiveness of the
Council’s framework of governance, risk management and control arrangements
for the year ending 31 March 2023.
 It is the opinion of the Council’s Risk Management Service that a good level of
assurance can be placed on the Council’s strategic risk control environment and
a good level of assurance can be placed on the council’s operational risk control
environment. 
4.4. Section 7 of the AGS highlights “Significant Governance Areas” which were identified
through the Horizon Scanning process and the Director’s Statements of Assurance
and the key actions that are being taken to address these during 2023/2024. The
Committee is asked to consider the areas detailed in the summary below. 
Comments have been added to show where this is new or has been carried forward
from the previous statement:-  
26

Page 27

4.5. The Committee is asked to note that the content of the Annual Governance Statement
is subject to scrutiny by the External Auditor and, therefore, may change after approval
by the CMT and the Risk and Audit Scrutiny Committee. However, the final
Governance Statement will be re-submitted for approval with the final Annual
Accounts. 
5. Significant Governance Areas
5.1. Progress on the significant governance areas highlighted within the Annual
Governance Statement 2021/2022 is attached at Appendix 3. 
6. Next Steps
6.1. The Governance Team will review and update the Council’s Local Code of Corporate
Governance with the changes highlighted from the annual review of governance
arrangements and report this to the CMT and the Risk and Audit Scrutiny Committee. 
6.3. The Good Governance Group will evaluate the governance review process and refine
this in preparation for the 2023/2024 annual review of governance arrangements. 
Significant Governance Areas identified in 2022/2023  Comments
Cyber resilience
Compliance with legislative and regulatory policy
Carried
forward from
2021/2022
Financial Challenges
Reduction in council funding, resulting in difficulties maintaining front
line services
Carried
forward from
2021/2022
Integrated Joint Board – Health and Social Care
The need for the council to deliver the objectives set out in the
Integrated Joint Board (IJB) Strategic Commissioning Plan 2022-25
Carried
forward from
2021/2022
Review of Community Planning
Provide support to complete the review of Community Planning
arrangements
Carried
forward from
2021/2022 
Community Wealth Building
Deliver the Action Plan and Year 2 Annual Report
Carried
forward form
2021/2022
Sustainable Development and Climate Change
Deliver the Sustainable Development and Climate Change Strategy 
Carried
forward from
2021/2022
Sustainable Development and Climate Change 
Develop a Local Heat and Energy Efficiency Strategy 
New
Economic Recovery and Renewal
Deliver the Economic, ‘Response, Recovery and Renewal’ Strategy 
Carried
forward from
2021/2022
South Lanarkshire Leisure and Culture (SLLC)
Develop the Commissioning Plan between the Council and SLLC
Support the Strategic Asset Review of SLLC occupied properties 
New
Recruitment and Retention Challenges Carried
forward from
2021/2022
27

Page 28

7. Employee Implications
7.1. Officers will continue to attend the Good Governance Group and will commit time to
review and monitor governance and assurance arrangements. 
7.2. Officers will be assigned to lead on areas identified as improvement areas. 
8. Financial Implications
8.1. There are no financial implications directly associated with this report. 
9. Climate Change, Sustainability and Environmental Implications
9.1 There are no significant implications for climate change or sustainability in terms of the
information contained in this report. 
10. Other Implications
10.1. The AGS will be subject to review by Audit Scotland as part of their consideration of
the council’s Annual Report. 
10.2. There are no significant issues in terms of risk associated with this report. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. All Resources, through senior officers, participate in the progress, monitoring and
review of governance arrangements and the preparation of the Annual Governance
Statement. 
11.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
9 June 2023 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
28

Page 29

 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Risk and Audit Scrutiny Committee - Annual Governance Statement 2021/2022 and
Quarter 4 Progress Report – 22 June 2022
 Risk and Audit Scrutiny Committee - Annual Review of the Local Code of Corporate
Governance – 7 March 2023 
List of Background Papers
 None 
Contacts for Further Information
If you would like further information, please contact:-
Geraldine McCann, Head of Administration and Legal Services
Ext: 4516 (Tel: 01698 454516) 
Email:- geraldine.mccann@southlanarkshire.gov.uk     
29

Page 30

30

Page 31

Annual Accounts 2023
(1) Good Governance
Resource 
Self-Assessment Draft Statement
Final Governance Statement
Risk and Audit Scrutiny Committee (RASC)
Corporate Management Team (CMT)
(11) Group Assurances  (8) External Reviews/
Regulation and
Inspection Reports 
(7) Risk Register
Monitoring/Reporting
(6) Sample checks on
Director’s 
Self-Assessment 
(4) Complaints/
Comments/
SPSO feedback
(3) Executive Directors’
Statement of Assurance
(2) Internal Audit
Reports/Annual
Assurance Report 
(17)  ALEO Good
Governance 
Self-Assessment and
Statement of Assurance 
(16) Information
Governance Self-
Assessment and Statement
of Assurance 
(15) Community Planning
Partnership – Community
Plan Progress Report 
(14) Connect, Resource
and Service Plan Progress
Reports (other 
performance reports)   
(13) Benchmarking Results
(12) Performance, Review
and Scrutiny Forum
Reporting
(18)  Equality Duty
Reporting
Reporting Schedule: 
RASC – 27 June 2023 
(19) Self-Assessment
Activity 
(10) Governance
Improvement Plan 
(9) External Audit
Reports 
(20) Annual Report and
Public Performance
Reports 
Good Governance 
Group Minutes 
(5) Assessment of
compliance with the
Local Code of Corporate
Governance
Appendix 1
4
31

Page 32

32

Page 33

Appendix 2 
South Lanarkshire Council 
Annual Governance Statement 2022/2023 
1. Scope of responsibility 
The residents of South Lanarkshire expect the council to conduct its business in a lawful and
transparent way.  In particular, the council has a duty to safeguard public money and account
for it; and to continuously review and improve how its functions are discharged, focussing on
the priorities of economy, efficiency, and effectiveness. 
The council is responsible for putting in place proper arrangements for the governance of its
activities, facilitating the effective exercise of its functions including clear arrangements for the
management of risk. 
A Local Code of Corporate Governance (referred to as the “Code” from here on) has been
approved and adopted.  The Code is reviewed and updated annually and is consistent with the
seven core principles of the Chartered Institute of Public Finance and Accountancy (CIPFA)
and the Society of Local Authority Chief Executives (SOLACE) framework entitled ‘Delivering
Good Governance in Local Government’.   
This statement explains how the council has complied with the Code during 2022/2023 and
meets legislative requirements to include the Annual Governance Statement within the Annual
Accounts.  It also sets out the significant changes to the council’s governance arrangements
as a result of the global health pandemic (referred to as the “Pandemic” from here on). 
2. The purpose of the council 
The Council Plan 2022-27 sets out the council’s vision, values and objectives and what
difference this will make to the residents and communities of South Lanarkshire.   The Council
Plan which was informed by the views of South Lanarkshire residents and information from
many other sources including local community plans, face to face discussions, online feedback,
feedback from Community Groups, Community events and surveys was approved by Council
in June 2022.  
The council is also a statutory Community Planning Partner and the Community Plan 2022-32
provides a common vision for the South Lanarkshire Community Planning Partnership and sets
out how the partners aim to achieve that vision.   
The council has set the framework for strong corporate governance by having a clear vision
and values which are outlined below: - 
Our vision is to improve the lives and prospects of everyone in South Lanarkshire.
Our priorities are:
• People – we will work to put people first and reduce inequality.
• Progress - we will work to recover, progress and improve.
• Planet – we will work towards a sustainable future in sustainable places.
Our outcomes will be:
• Communities and environment - Caring, connected, sustainable communities.
4
33

Page 34

• Education and learning - Inspiring learners, transforming learning, strengthening
partnerships.
• Health and wellbeing - People live the healthiest lives possible.
• Children and young people - Our children and young people thrive.
• Housing and land - Good quality, suitable and sustainable places to live.
• Our economy - Thriving business, fair jobs and vibrant town centres.
Our values are:
• Focused on people and their needs
• Working with and respecting others
• Accountable, effective, efficient and transparent
• Ambitious, self-aware and improving
• Fair, open and sustainable 
• Excellent employer 
3. The purpose of the council’s governance framework 
The governance framework comprises of the culture, values, systems, and processes by which
the council is directed and controlled.  It describes the way the council is accountable to
communities.  It enables the council to monitor the achievement of its strategic objectives and
consider whether these objectives have led to the delivery of appropriate and cost-effective
services. 
The system of internal control is a significant part of that framework and is designed to manage
risk to a reasonable level.  It is based on an ongoing process designed to identify and prioritise
the risks to the achievement of the council’s aims and objectives by evaluating the likelihood
and potential impact of those risks being realised.  This enables the council to manage risk
efficiently, effectively, and economically. 
The governance framework has been in place at South Lanarkshire Council for the year ended
31 March 2023 and up to the date of approval of the Annual Report and Accounts. 
4. How the council monitors and evaluates the effectiveness of its governance
arrangements? 
The council annually reviews the effectiveness of its governance arrangements.  The key
sources of assurance that inform this review and underpin the statements made within this
document are shown in the diagram below.  
34

Page 35

5. Key elements of the council’s governance assurance framework 
The council aims to achieve good standards of governance by adhering to the seven national
principles below, which form the basis of the council’s Code.  These principles are used each
year to evaluate governance arrangements and identify areas for improvement.   
35

Page 36

The following table demonstrates how the council has complied with these principles and
provides assurance as to how they are met.  Significant elements of the systems and processes
that comprise the council’s governance arrangements and important changes/ developments
are described.  Links to the key council documents referred to below can be found in Section
2 of the Code.  The impact of the Pandemic has been included and additional commentary can
be found at the end of this section.  Commentary on the council’s level of compliance with the
CIPFA Financial Management Code can also be found at the end of this section.   
Principle A: Behaving with integrity, demonstrating strong commitment to ethical values, and
respecting the rule of law
Links to Council’s values:
• Accountable, effective, efficient, and transparent; Working with and respecting others
How we do this:
• The Council’s values and objectives provide clear direction to councillors and employees
and are embedded in all policies and processes.
• Standards of conduct and integrity were promoted through the national Code of Conduct for
Councillors and by the Standards and Procedures Advisory Forum.  This is supplemented
by role profiles which have a core accountability to maintain the highest standards of
conduct.  
• The employee Code of Conduct outlines standards of conduct and integrity.  All breaches
including reported cases of suspected unethical behaviour and non-compliance with the
law/policy were investigated through the employee disciplinary process and the
recommended actions taken. 
• Professional Codes of Conduct ensured that ethical standards were maintained, and all
breaches were investigated by the governing body.  
36

Page 37

• To support integrity in decision making, the Council has a number of Committee procedural
documents including decision making protocols known as the Scheme of Delegation, terms
of reference documents, standing orders on procedures and contracts and financial
regulations. 
• To ensure openness and transparency agendas and Committee reports are published to the
council website at least five working days ahead of the scheduled meeting dates and any
minutes of decisions taken by the Chief Executive during any period when committee
meetings are suspended are publicised on the Council website. Committee meetings are
live streamed to the Council’s YouTube channel.  
• To ensure openness and transparency in decision making processes, all declarations of
interest made by councillors at meetings were recorded and made available online.  
• There are a range of policies such as the Counter Fraud, Bribery and Corruption Policy
Statement and Strategy, Fraud Response Plan, Whistleblowing for Third Parties and
Confidential Reporting procedures.  These continue to be updated to reflect best practice
and support a culture of ethical behaviour amongst employees and councillors.  
• Health and Safety compliance during 2022/2023 was assessed as being within the top rating
band of “good”.
• Legal Services maintained an overview of legislation and regulations and worked with
services to ensure compliance.
Principle B: Ensuring openness and comprehensive stakeholder engagement 
Links to Council’s values:
Accountable, effective, efficient, and transparent; Fair, open, and sustainable; Focused on
people and their needs; Working with and respecting others
How we do this: 
• To ensure transparency and openness in decision making processes, all agendas, reports,
and decisions were published on the Council’s website and printed copies were available
for public inspection for all Committee and Forum meetings (except the Standards and
Procedures Advisory Forum).  From April 2021 all Committee meetings were live streamed
to the Council’s YouTube channel http://bit.ly/SL_Committees. From August 2021 all Forum
meetings have been live streamed.
• The Committee Management Information System allows members of the public to register
and be notified when Committee and forum papers are published.  The system also
facilitates the creation of online petitions to increase the potential reach of signatories.
• The work of the Council and key information from our partners is communicated regularly
using a range of communication channels.  The South Lanarkshire View pages on the
Council website provide a dedicated source of local information and news for communities. 
A variety of social media channels are used to communicate updates and share information.    
• A suite of dedicated Pandemic pages providing advice, help and public health information
were created and maintained on the council website. 
• A ‘Let’s Talk South Lanarkshire’ campaign has been established and was used to engage
local people in an initial discussion about their experiences of the pandemic and continues
to be used for ongoing dialogue with communities on both the Council and community
planning priorities.
• The Council’s Community Engagement Team continue their work to increase stakeholder
engagement and involvement in decision making processes through the continued
development of new Community Planning Partnership Neighbourhood Plans which are
aimed at improving outcomes and reducing inequalities. 
• The Community Planning Partnership published its first Community Participation and
Engagement Strategy 2020 to 2025 which is also available online in BSL and the Council
has produced an online course for employees to complement this. 
• A partnership Participation and Engagement Group has been established to ensure that
there is a consistent and co-ordinated approach to engaging with communities.
37

Page 38

• The Council carried out circa 50 surveys and engagement activities with residents,
employees, and partners, and through the council’s Citizens Panel to inform policy and
service delivery.  Further information on our surveys is published on the Council’s website. 
• To ensure inclusivity and help shape service delivery, the Council co-ordinates regular
engagement with targeted groups of people such as young people, older people, people
with disabilities, unpaid carers, black and ethnic minorities, etc.  Groups considered items
such as the budget consultation, rent setting and performance reporting.  
• The Participation Requests and Community Asset Transfer processes support communities
to engage with the Council to improve local outcomes. 
• The Council’s performance Spotlights summarise what the council has achieved and the
Public Performance Reports provide a comprehensive overview of service
performance.  These, along with the council’s Benchmarking report demonstrate the
council’s commitment to continuous improvement and achieving Best Value; summarise
the progress that the council has made in meeting its priorities and how it is performing
locally and nationally.
• The Council’s Digital Inclusion Strategy 2020 to 2023 sets out the actions that the Council
is taking to assist those people who are unable to get online to access services digitally. 
The Council also leads on a partnership Digital Inclusion Group. 
• A comprehensive range of information on how the Council operates is available on the
website.  The Freedom of Information Publication Scheme ensures that key information
about how the council works is accessible to the public.  
Principle C: Defining outcomes in terms of sustainable, economic, social, and environmental
benefits 
Links to Council’s values:
Accountable, effective, efficient, and transparent; Fair, open, and sustainable; Focused on
people and their needs
How we do this: 
• The Council adapted approaches in response to the Pandemic to ensure processes
continued to be effective, efficient, and transparent. 
• The Council has a Capital Strategy that has a long-term outlook on future capital investment
(up to 2027/2028).  This document is underpinned by a suite of Asset Management Plans
which are aligned with the council’s objectives and focus on creating an efficient, fit-for-
purpose and sustainable core estate that delivers best value in terms of investment, running
costs and environmental impact.
• The Council Plan 2022 to 2027 and Community Plan 2022 to 2032 have clearly defined
economic, social, and environmental outcomes to be delivered during the period.  
• A  Community Wealth Building Strategy setting out the Council’s ambitions in relation to
spending, workforce, land and property, finance and building the generative economy was
approved in March 2021. A Community Wealth Building Commission was  established to
oversee the implementation of the Strategy .A Community Wealth Building Progress Group
has been set up to ensure that timescales within the action plan are met.
• Annual Resource Plans which deliver the objectives of the Council Plan were reviewed and
updated.  These plans outline the outcomes and actions to be achieved within the year and
reference linkages with other key strategic plans of the Council and partnership plans.
• The Sustainable Development and Climate Change Strategy 2022-27 was approved by the
Council in June 2022 and which sets out the Council’s strategic vision ,themes and priorities
in terms of the Council, environment and communities for sustainable development and
climate change during the period was developed using the principles of the United Nation’s
Sustainable Development Goals and to reduce the council’s contribution to global warming.  
• The Council’s Climate Change and Sustainability Committee oversees the delivery of the
Sustainable Development and Climate Change Strategy 2022-2027, the council’s transition
to carbon neutrality and climate resilience.     
38

Page 39

• The Council’s new Procurement Strategy 2023-28 which will be complemented by an annual
action plan, sets out how value for money, national and local priorities will be delivered.  It
also demonstrates how the council will deliver the wider social, economic, and
environmental aims of procurement as required by the sustainable procurement duty.  
• Sustainability principles are embedded in procurement processes and in recognition of the
importance of our suppliers in achieving the Council’s aim to become more sustainable.  
• Strategic Environmental Assessments (SEAs) were completed for all relevant council led
policies, plans and strategies developed during 2022/2023.
• The South Lanarkshire Local Development Plan 2 was adopted by the Council on 9 April
2021.  The spatial strategy of the plan is to encourage sustainable economic growth and
regeneration, a move towards a low carbon economy, protect the natural and historic
environment and mitigate against the impacts of climate change.
• A summary of the findings resulting from Equality Impact Assessments of the council’s key
decisions on service users, communities and businesses have been published on the
Council’s website.  
• Strategic decisions of the Council have been subject to a Fairer Scotland Impact
Assessment which considers how inequalities of outcome can be reduced.
Principle D: Determining the interventions necessary to optimise the achievement of the
intended outcomes 
Links to Council’s values:
Accountable, effective, efficient, and transparent; Ambitious, self-aware, and improving;
Focused on people and their needs; Working with and respecting others
How we do this: 
• Key services were adapted, and delivery was maintained throughout the Pandemic in line
with Public Health guidance and Government guidance and legislation.  
• There is a standard approach to identifying savings across the Council.  The Council’s
efficiency programme is overseen by the Senior Management Team.  Frameworks are in
place for holding discussions with key stakeholders.  Savings achievements are monitored
monthly and reported to the Senior Management Team quarterly.   
• The Financial Strategy which is aligned with the Council’s objectives was updated during
the year to reflect the latest internal and external influences.  This plan sets out the
assumptions in terms of commitments, grant funding and efficiency requirement and
demonstrates sound financial management and the ability to address projected funding
gaps.
• The annual budget setting consultations took place with members of the public, groups and
the Council’s partners in order to inform the budget process. The annual budget is open to
scrutiny and amendment by councillors until the approval of the final budget.  
• The Council’s Performance Management Framework has ensured that progress against
intended outcomes has been regularly reported to Management Teams; Committees; and
the Performance and Review Scrutiny Forum.  Decisions and actions to address
performance issues have been taken and monitored to ensure that they have been effective. 
• The Council has complied with its statutory and regulatory reporting requirements during the
year.  
• The Public Bodies (Joint Working Act) sets out those Adult Care Services that are delegated
to the Integration Joint Board (IJB) as set out in the South Lanarkshire Integration
Scheme.  These services continue to be operationally delivered by the council in line with
the strategic direction set out in the Strategic Commissioning Plan and annual IJB Directions.
• The Council considers the specification and achievement of community benefits, which
focus on the health, economic, social, and environmental wellbeing of the South Lanarkshire
area, when awarding contracts.
• To improve efficiency and effectiveness, the Council is the lead authority for a range of
collaborative projects and services delivered through the Clyde Valley Learning and
Development Group.
39

Page 40

Principle E: Developing the entity’s capacity, including the capability of its leadership and the
individuals within it
Links to Council’s values:
Accountable, effective, efficient, and transparent; Ambitious, self-aware, and improving;
Excellent employer; Focused on people and their needs; Working with and respecting others
How we do this: 
• A Leadership Challenge Programme which is linked to succession planning has been
developed and rolled out during 2022-23.
• Learning and Development programmes were revised and employees at all levels can now
access optional accredited management qualifications.
• Training requirements were identified and online learning and development opportunities
including webinars and e-briefings were developed and offered to all councillors.  
•  Feedback from the survey  on working from home/hybrid working, will be used to inform
future agile working arrangements.
• A range of policies and activities are in place to support the Health and Wellbeing of
employees including physical and mental health and these have been regularly
communicated.  Online wellbeing events were held in response to the new ways of working.
• The Council recognises that skilled and motivated employees are a key asset.  All
employees have an annual performance appraisal which links to the Council values and a
Personal Development Plan.  The council offers a range of training interventions to support
employee development. 
• The Council has a comprehensive and coordinated approach to workforce planning which
also supports succession planning.  Each Resource reviews their workforce plan and related
action plan to better understand workforce capacity issues, further challenges, and
opportunities to ensure that resources are in the right place, at the right time and people
have the right skills.  The Council-wide Workforce plan has been revised to consider the
workforce requirements as a result of the pandemic response.   
• Senior Managers have overseen the annual scrutiny of the Council’s assets through the
review of a suite of Asset Management Plans.  Service Asset Management Plans have been
developed in line with CIPFA guidance and these feed into the Corporate Asset
Management Plan which outlines priorities and provides an overview of how the Council has
performed in this area.  
• The Council’s Scheme of Delegation, Financial Regulations, Standing Orders on Contracts
and Terms of Reference ensured that Committees, officers, and statutory officers were clear
on the decisions that could be made within their area of authority.  This is supplemented by
councillor’s role profiles which outline the key purpose, specific and core accountabilities for
each role.  
• The Council continues to work with a range of public sector, business, and academic
partners to improve outcomes for those living and working in South Lanarkshire.  Strategic
Partnerships include the Community Planning Partnership and the Glasgow City Region City
Deal.  
• Local Government Benchmarking Framework(LGBF) results continue to be reported to the
Performance Review and Scrutiny Forum, containing all LGBF indicators. As other reporting
arrangements mature, the scale of this report may be reduced and the strategic suite of
indicators aligned to Council Plan outcomes will feature in a new appendix to the Council
Plan Q4 report, giving an opportunity to assess the Council’s performance over time and
comparative performance in the context of the Council Plan priorities. 
• Further LGBF indicators will feature in the Council’s public performance reporting, both in
the Annual Performance Spotlights and in the PPR pages on the website. These are topic-
based and place the LGBF information in a richer context than is possible in the annual
LGBF report.  The results are analysed and an action plan developed which will be
monitored by the Senior Management Team.
40

Page 41

• The Council takes a risk-based approach to self-assessment which is used to review and
redesign services with a focus on fundamental change.  Progress and the impact of
improvement activity was reported to the Senior Management Team and the Performance
and Review Scrutiny Forum.  
• The Council has a robust complaints process which is underpinned by national complaints
handling standards.  Complaints performance was regularly reported to Senior Management
and Committee and learning from complaints which is integral to this process is also
published on the Council’s website.  Complaint handling procedures have been updated in
line with national changes and communicated to all employees.
Principle F: Managing risks and performance through robust internal control and strong
public financial management
Links to Council’s values:
Accountable, effective, efficient, and transparent; Ambitious, self-aware, and improving 
How we do this: 
• The Council, in partnership with Trade Unions, ensured that safe systems of work were in
place through a robust risk assessment process, changes to working methods and supply
of personal protective equipment.  
• The Council has put in place comprehensive arrangements for identifying, evaluating, and
controlling significant risks which threaten the council’s ability to meet its objectives to deliver
services to the public.  There is also a robust process in place for compliance monitoring of
the Council’s Risk Management Strategy, Resource Risk Registers and Control Plans.  
• The annual end of year compliance statement evidenced that all Resources were compliant
with Risk Management Strategic requirements.
• The Council’s risk scoring matrix was revised as an outcome of the 2021/2022 annual review
of risks.
• The Council’s Internal Audit Service which complies with Public Sector Internal Audit
Standards completed a revised annual programme of risk-based audits with an objective of
providing an opinion on the adequacy and effectiveness of the Council’s risk management,
governance, and internal control arrangements.  Where improvements were required, action
plans were developed and monitored and where necessary follow-up audit work completed.
• In response to changes in working practices and the introduction of new systems, for
example to process pandemic grants, Internal Audit has advised on key internal controls
that should be maintained through the identification of alternative controls and has been
involved in the development of new systems.
• The Information Governance Board is satisfied that Resources have followed the
Information Governance operational arrangements to promote effective arrangements for
the safe collection, storage, use and sharing of data, including processes to safeguard
personal data. 
• Information security incidents have continued to be monitored and considered for notification
to the Information Commissioner’s Office.  Throughout the period, the Council’s Data
Protection Officer provided advice and assistance to Resources in relation to meeting their
obligations under UK General Data Protection Regulations (GDPR).
• The system of internal financial control is based upon the Financial Regulations which set
out the rules to ensure robust internal control over the council’s finances.  Control is
maintained through regular management information, management supervision and a
structure of delegation and accountability.  
• The cost of the pandemic on the council’s budgets has been closely monitored and regular
reports have been presented to the Senior Management Team and Committee.   
• External Audit of the Council’s accounts is robust and a “clean audit certificate” was issued
for 2021/2022.  
• Through a well-established Performance Management Framework, the council has clearly
defined processes in place for the identification, monitoring, and reporting of its objectives
to ensure continued effectiveness and the achievement of Best Value.  Progress is
41

Page 42

monitored and reported regularly to both managers and councillors.  This includes areas of
under-performance and the related improvement actions.  
• Trustees of the South Lanarkshire Charitable and Educational Trusts received independent
legal training setting out their duties and responsibilities in ensuring that the trusts operate
in a manner designed to benefit communities. 
• The Executive Director of Finance and Corporate Resources is a member of the Council’s
Senior Management Team and as such, is integral in all major decisions taken by the
Council, and in material matters which are submitted to councillors for decision.  This
involvement fulfils the expectation of CIPFA in terms of the role of the Chief Financial Officer.
• The Council previously completed a self-assessment using the principles of the CIPFA     
Financial Management Code identifying 3 areas to be progressed.  Since then, the 2020/21
annual budget consultation approach and a standard options appraisal process continue to
be embedded across the Council, while our existing financial management controls and
measures continue to provide comfort on the Council’s financial management and
resilience.  This includes the preparation of a medium term strategy presented to members
regularly as part of the annual budget process, providing members with the information
required to assist budget planning      
Principle G: Fair, Open and Sustainable; Implementing good practices in transparency,
reporting, and audit to deliver effective accountability
Links to Council’s values:
Accountable, effective, efficient, and transparent; Ambitious, self-aware, and improving;
Working with and respecting others
How we do this: 
• The Good Governance Group has completed the annual review of governance
arrangements at resource level and in line with the CIPFA/SOLACE Delivering Good
Governance Framework.  Governance improvement actions have also been identified and
are included in Resource/Service Action Plans.  Progress against actions including those
highlighted as significant governance areas for action will be reported to the Senior
Management Team and Committee.   
• In the 2021/2022 annual audit report, the external auditor reported that the council had in
place appropriate arrangements to support good governance and accountability and  they
were of the view that governance arrangements remained effective in 2021/22.
• All Directors completed their annual Statement of Assurance and relevant assurances have
been provided.    
• The Council prepares and publishes an Annual Governance Statement which is aligned with
national guidance and reflects on the adequacy and effectiveness of the Council’s
governance arrangements.  This is independently considered by External Audit and
published with the Annual Accounts and separately on a dedicated governance web page.
• The annual review of governance arrangements for the Council’s at Arm’s Length External
Organisation (ALEO) and key external service providers has not highlighted any compliance
issues.
• The annual review of the Local Code of Corporate Governance was completed, and the
revised Code was approved by Committee and re-published on the Council’s website.  
• all agendas, reports and decisions continue to be published (except those exempt under the
Local Government (Scotland) Act 1973) on the council’s website.   All Committee and Forum
meetings are livestreamed to the Council’s YouTube page http://bit.ly/SL_Committees.
• The Risk and Audit Scrutiny Committee considered the adequacy and effectiveness of the
Council’s governance arrangements and internal control environment and approved the
Annual Governance Statement and Accounts.   
• Internal audit activity has continued to be reported to the Senior Management Team and to
the Risk and Audit Scrutiny Committee. 
• Internal Audit changed how their findings are presented to the Risk and Audit Scrutiny
Committee to improve scrutiny. 42

Page 43

• Outcomes from external audit and inspection activity was reported to the appropriate
Committee and action plans were developed for implementation where required. 
COVID-19 Pandemic Governance Arrangements
The 2019/2020 Governance Statement set out the initial impacts of the Pandemic on the
council’s governance arrangements.  During 2020/2021, the council, its partners and local
community organisations continued to strengthen the partnership approach in response to the
Pandemic. In 2022/2023 the council continues to manage any remaining impacts of the
Pandemic through robust resilience arrangements and controls. 
As the council  moved through the different phases of response and recovery, changes to
governance arrangements were made to comply with national guidance and legislation.  In
some cases new ways of working put in place to continue to maintain the delivery of essential
business of the council during the Pandemic have been embedded and continued.  Priority
services were maintained throughout the Pandemic and many new services/processes
established.  Schools, nurseries, etc.  adapted in accordance with national decisions and
guidance.      
Costs associated with the Pandemic were met from funding provided by the Scottish
Government and the council  continued to monitor the financial impact of the Pandemic into
2022/2023 and beyond.  This  included working with South Lanarkshire Leisure and Culture on
the impact of the Pandemic on their business and their recovery. 
The council and the Community Planning Partnership  reviewed their priorities which were
informed by ongoing dialogue with local communities, organisations, and businesses. 
Recovery was  a significant area of work for the council and its partners and was highlighted
as such in Section 7 of the 2021-2022 Annual Governance  Statement. 
CIPFA Financial Management Code
The Financial Management Code (FM Code) provides guidance for good and sustainable
financial management in local authorities.  By complying with the principles and standards
within the code authorities will be able to demonstrate their financial sustainability.  The
following information sets out the council’s level of compliance with the CODE.
The council has reviewed the principles of the FM Code as part of its internal governance
process.  The Council previously completed a self-assessment using the principles of the
CIPFA Financial Management Code identifying 3 areas to be progressed.  Since then, the
2020/21 annual budget consultation approach and a standard options appraisal process
continue to be embedded across the Council, while our existing financial management
controls and measures continue to provide comfort on the Council’s financial management
and resilience.  This includes the preparation of a medium-term strategy presented to
members regularly as part of the annual budget process, providing members with the
information required to assist budget planning 
6. Review of Effectiveness 
The review of governance arrangements for 2022/2023 has also considered the following
assurance outcomes: - 
43

Page 44

Group Assurances 
In respect of the Joint Boards, Charities and Companies that fall within the council’s group
boundary, the review of their internal financial control systems is informed by: - 
• Annual Governance Statements included in the respective financial statements of the Joint
Boards.
• Assurances from company directors and/or other senior company officials; and
• The work of the relevant body’s respective external auditors (and where relevant internal
auditors) and other interim reports. 
The Executive Director of Finance and Corporate Resources, the council’s Chief Financial
Officer, has considered the effectiveness of the group’s internal financial control system for the
year ended 31 March 2023.  It is the Executive Director of Finance and Corporate Resources’
opinion that reasonable assurance can be placed on its effectiveness. 
Internal Assurance 
It is the opinion of the council’s Risk Management Service that a reasonable level of assurance
can be placed on the council’s strategic risk control environment and a reasonable level of
assurance can be placed on the council’s operational risk control environment. 
It is the opinion of the council’s Audit and Compliance Manager that, overall, reasonable
assurance can be placed on the adequacy and effectiveness of the council’s framework of
governance, risk management and control arrangements for the year ending 31 March 2023. 
7. Significant Governance Areas 
The 2021/2022 Annual Governance Statement identified 11 significant governance areas that
the council were working to address.  Progress updates can be found on the council’s website;
see the Significant Governance Areas Update Q4 2021/2022. Six of these areas remain as
significant areas of action for the council moving forward into 2022/2023 and will continue to
be monitored as such.   
Through the 2022/2023 annual governance review, the following areas which outline the
actions being taken to address them have been identified as significant areas of work for the
council during 2022/2023:- 
No. Areas identified in 
2022/2023
Actions  Lead Officer
1 Cyber Resilience 
Compliance with
legislative and
regulatory policy 
A programme of actions to maintain
cyber security and resilience in
2023/2024 will include:
• Refresh/retiral of legacy systems,
network equipment and end user
devices (mobile phones, PCs)
• Programme of security patching of
all systems
• Compliance with PSN and Cyber
Essentials schemes
• Incident response 
• Officer training and awareness
(e.g., phishing)
Executive
Director of
Finance and
Corporate
Resources
44

Page 45

No. Areas identified in 
2022/2023
Actions  Lead Officer
• Data security reviews as part of
new system installation and
security monitoring 
2  Financial Challenges
Exceptional increase in
costs, reduction in
council funding, resulting
in difficulties maintaining
front line services
The Council faces a challenging situation
in the medium to long-term because of
reduced funding in real terms, rising
costs and an increase in demand.   In
addition there are exceptional increases
in costs being experienced resulting in
significant budget gaps that will require to
be managed.
The Council has developed a long-term
strategy which identifies budget
pressures, future risks and uncertainties,
and projects budget gaps to 2028/2029. 
The Budget Strategy for 2024/2025 will
be updated and presented to councillors
tin 2023.
Chief
Executive
Director of
Finance and
Corporate
Resources
3 Integrated Joint Board
– Health and Social
Care
The need for the Council
to deliver the objectives
set out in the Integrated
Joint Board (IJB)
Strategic
Commissioning Plan
2022-25 
The current strategic direction set out and
approved by the IJB is detailed within the
Strategic Commissioning Plan.  The
council and NHS Board are required to
deploy their resources in line with this
strategic direction. 
The IJB issues Directions that set out the
key actions to be delivered by the council
during the year 2023/2024 and these
Directions were agreed by the IJB at it
special budget meeting in March 2023.  
The council will provide progress updates
against Directions for which it is the lead
organisation.
Director,
Health and
Social Care,
South
Lanarkshire
Health, and
Social Care
Partnership
4 Review of Community
Planning
Provide support to the
review of Community
Planning arrangements   
Complete the review of community
Planning which focussed on several key
areas including structures, governance,
and accountability arrangements.  The
council will provide resources to support
the completion of the Review and work
with partners to progress changes,
Director of
Finance and
Corporate
Resources
45

Page 46

No. Areas identified in 
2022/2023
Actions  Lead Officer
5 Community Wealth
Building 
Deliver the Community
Wealth Building Strategy 
The Community Wealth Building Strategy
which was approved in March 2021 will
bring fundamental changes to how the
Council delivers its services and works
with its partners and communities. In
August 2021 the Community Wealth
Building Commission approved an action
plan containing a range of actions to
progress the aspirations of the Strategy  
over a 3-to-5-year timeframe. A risk
register has been developed and
approved. Risk monitoring arrangements
are in place
An annual report highlighting progress
over the first year of the Strategy was
presented to the Commission on  28
June 2022 for approval.
A further Annual Report on the year 2
Year 2 Actions identified in the approved
Action Plan will be progressed in
2023/2024.
Director of
Finance and
Corporate
Resources
6 Sustainable
Development and
Climate Change 
A new Strategy for 2022-2027 was
developed and presented to Council in
June 2022 for approval together with the
Council Plan and Community Plan. An
Action Plan was developed for the first
year of the Strategy .The Action Plan will
be reviewed annually with progress
updates being reported to the Climate
Change and Sustainability Committee on
a 6 monthly basis.
Director of
Community
and
Enterprise
Resources
9 Economic Strategy The new draft Economic Strategy 2022-
2027 has been developed and approved
by Council on 15th June 2022 as part of a
suite of documents accompanying the
draft Council Plan and Community Plan.
The vision within the Strategy is “to make
South Lanarkshire a flourishing, green,
dynamic and equitable place for
communities, visitors, businesses and
investors”.  The Strategy is framed
around the 3 themes of sustainable,
inclusive, economic development-
People, Place and Business. 
Progress on the delivery of the Action
Plan will be measured 6-monthly with the
Director of
Community
and
Enterprise
Resources
46

Page 47

No. Areas identified in 
2022/2023
Actions  Lead Officer
results being reported annually to the
relevant committees.
The council will continue to lead on local
economic recovery for South Lanarkshire
businesses through promotion of local
economic support networks and
contribution to the pan-Lanarkshire
Economic Forum.
10 South Lanarkshire
Leisure and Culture
• Develop the Commissioning Plan
between the Council and SLLC
• Support the Strategic Asset
Review of SLLC occupied
properties 
Director of
Community
and
Enterprise
Resources
11 Recruitment and
Retention Challenges 
The labour market has tightened and
employees have more mobility through
agile working which is not necessarily
tied to a geographical location.  In
addition some older workers have
reassessed priorities and taken up an
option for partial or full retiral earlier than
they would have done previously.
As a result there are a number of skills in
short supply nationally and this is putting
pressure on local government
services.  Examples of this include HGV
drivers, procurement and Social
Care.  The impact on Senior Manager
recruitment and retention is also clear
and turnover at this level is closely
monitored
South Lanarkshire Council has
experienced these issues and is taking
the following actions:-
• Workforce Plans were refreshed to
reflect the changed environment
by 30 June 2022. The updated
plans were reported to the relevant
Resource Committees in
September and October 2022.
• A grow your own approach is
being used in key areas (recruited
graduates in Procurement)
• Increasing social media
recruitment and use of job fairs
• Employability routes are being
defined for skills shortage areas
(e.g. Social care)
Chief
Executive
and all 
Directors 
47

Page 48

No. Areas identified in 
2022/2023
Actions  Lead Officer
• Enhanced employee support
arrangements are in place but also
being reviewed for development 
8. Summary
The annual review of governance arrangements across the council and overall compliance
with the council’s Code demonstrate sufficient evidence that the Code’s principles of Delivering
Good Governance in Local Government operated effectively, and that the council complies
with its Code.  
During 2023/2024, steps will be taken to address the significant governance areas highlighted
in this statement to further strengthen the council’s governance arrangements and evidence
our commitment to continuous improvement.   
Joe Fagan
Leader of the Council 
Signature:        Date: 
Cleland Sneddon
Chief Executive 
Signature:        Date: 
48

Page 49

Appendix 3 
Annual Governance Statement 2021/2022 – Significant Governance Areas 
Quarter 4 update – September/October 2022 to March 2023 
Areas identified in 2021/2022 Actions Quarter 4 Progress
1. COVID-19 pandemic
The council will continue to
respond to matters arising from
the COVID-19 pandemic
The council will continue to monitor national
guidance; maintain ongoing resilience
arrangements; and implement further
measures as and when required in response to
the Pandemic.
Corporate and Resource risk registers will
continue to be monitored and updated to
reflect national and local developments.
Schools and educational establishments made good
progress through the recovery and renewal phase.
The pandemic and mitigations were included in the 
Council Risk Register and individual Resource risk
registers and Resource Plans as appropriate. 
The council continued to build on the partnership
arrangements it had in place with NHSL Public Health to
plan and mitigate against public health matters.
Social Work and social care critical functions framework
remains in place.   
Pressures with particular recognition to the potential
impacts of COVID-19, influenza, cost of living issues and
other concurrent risks remain, and winter planning
arrangements put in place have continued.  There are
also unprecedented pre-existing system wide pressures
as a result of the ongoing challenge of recovering from
and working with the ongoing impact of the COVID-19
pandemic. 
Multi-agency approach taken across NHS Lanarkshire,
the two Health and Social Care Partnerships
(HSCP)/Integrated Joint Boards (IJBs), North and South
Lanarkshire Councils together with the respective
supports.
Social Work Resource risk register monitored and
reviewed by Senior Management Team and reported to
4
49

Page 50

Areas identified in 2021/2022 Actions Quarter 4 Progress
every Social Work Committee.  Risk is prioritised on those
associated with public protection to ensure children and
vulnerable adults continue to be supported. 
2. COVID-19 Pandemic
recovery
Recovery actions
As conditions continue to improve, the council
will deliver the right services in the right way,
for the benefit of our residents and
communities.
As conditions  improved  all Resources have resumed
services which were stood down or delivered in a different
way. 
Demand continues to be very high for Social Work
Resources and clearing the backlog of demand resulting
from the pandemic remains a priority, particularly within
Justice services, where access to sufficient
accommodation to see face to face appointments remains
challenging.  Recovery progress will continue to be
monitored.  Should conditions change the social work and
social care critical framework will be utilised. 
3. Cyber Resilience 
Compliance with legislative and
regulatory policy
A programme of actions to maintain cyber
security and resilience in 2022/2023 will
include:
• Refresh/retiral of legacy systems,
network equipment and end user
devices (mobile phones, PCs)
• Programme of security patching of all
systems
• Compliance with PSN and Cyber
Essentials schemes
• Incident response 
• Officer training and awareness (e.g.,
phishing)
• Data security reviews as part of new
system installation      
Security monitoring
Education Resources has operating procedures which
provide guidance to on cyber bullying and information
security which are monitored on annual basis. Security is
a key feature of the managed ICT service contract for
schools and establishments, which includes a refresh
programme. 
All actions have been progressed. The Council achieved
PSN certification for 2023. This recognises both the
current cyber security status, and SLC’s ongoing
programme of system upgrades to maintain this. 
50

Page 51

Areas identified in 2021/2022 Actions Quarter 4 Progress
4. Financial Challenges
Exceptional increase in costs,
reduction in council funding,
resulting in difficulties
maintaining front line services. 
The Council faces a challenging situation in the
medium to long-term because of reduced
funding in real terms, rising costs and an
increase in demand.   In addition there are
exceptional increases in costs being
experienced resulting in significant budget
gaps that will require to be managed.
The Council has developed a long-term
strategy which identifies budget pressures,
future risks and uncertainties, and projects
budget gaps to 2028/2029. 
The Budget Strategy for 2023/2024 will be
updated and presented to councillors during
2022. 
All Resources  identified the main challenges, risks and
new developments which would have a significant impact
on the delivery of services.
The impact of the financial challenges features in the
Council wide risk register and also individual Resource
Risk Registers  and in all Resource Plans. 
The council identified and implemented a range of new
and existing supports to help households manage scarce
resources and services  explored all avenues to support
the most vulnerable in the financial year 2022/2023.
The budget strategy for 2023/2024 was updated and
presented to councillors to inform the budget setting
process for 2023/2024. 
51

Page 52

Areas identified in 2021/2022 Actions Quarter 4 Progress
5. Integrated Joint Board –
Health and Social Care
The need for the council to
deliver the objectives set out in
the Integrated Joint Board (IJB)
Strategic Commissioning Plan
2022 to 2025 
The current strategic direction set out and
approved by the IJB is detailed within the
Strategic Commissioning Plan.  The council
and NHS Board are required to deploy their
resources in line with this strategic direction. 
The IJB issues Directions that set out the key
actions to be delivered by the council during
the year 2022/2023 and these Directions were
agreed by the IJB at it special budget meeting
in March 2022.  
The council will provide progress updates
against Directions for which it is the lead
organisation.
The Annual Performance Report (APR) 2021/2022 for the
South Lanarkshire Integration Joint Board (IJB) was approved
on 13 December 2022.   
The APR aimed to ensure that performance was open and
accountable, whilst providing an overall assessment of
performance in relation to planning and carrying out integration
functions. 
As recommended by the Scottish Government, the report
included: 
 a summary of progress against the 9 National Health
outcomes using, as a minimum, the 23 core national
performance indicators 
 financial performance and Best Value 
Work will now commence on the 2022/2023 Annual
Performance Review. 
The IJB’s external auditor, Audit Scotland, was required to
supply an audit certificate outlining the findings of the audit
process undertaken in relation to the IJB’s Annual Accounts
2021/2022. 
Newly formed Locality Implementation Groups have developed
locality plans and profiles which underpin the Strategic
Commissioning Plan.  The plans, which were approved in
March 2023, will focus on the delivery of the following priorities:
Early Intervention, prevention and reducing inequalities; Mental
health and addictions; Improving unscheduled care and
optimising intermediate care; and Supporting carers.   
6. Review of Community
Planning
During 2019, the Community Planning
Partnership Board undertook a self-
assessment of the current Community
Interim structures are in place and the new Community
Plan was presented to the CPP Board for approval on  22
June 2022 together with a progress update on structure
52

Page 53

Areas identified in 2021/2022 Actions Quarter 4 Progress
Provide support to the review of
Community Planning
arrangements 
6. Review of Community
Planning cont’d. 
Planning arrangements.  Improvement actions
were later supplemented by the
recommendations from the Council’s Best
Value Assurance Review and a group was set
up to take these forwards.  
The review focuses on several key areas
including structures, governance, and
accountability arrangements.  The council will
provide resources to support the
implementation of the agreed actions. 
The proposal was approved by the Community
Planning Partnership Board at their meeting in
September 2020.  This highlighted a two-
phase approach to implementation,
with interim actions to be delivered during the
2021/2022 year leading to final improvements,
particularly around structures, during
2022/2023 in order to ensure that the
partnership is fit for purpose to deliver the
outcomes within the new Community Plan,
which will be created using a co-production
model during 2021/2022. 
changes.  Further progress updates  were made to the
CPP Board on 14 September 2022 detailing the changes
required to governance structures in order to deliver the
plan.  Work continues with the partners to progress
changes.
7. Community Wealth Building
Deliver the Community Wealth
Building Strategy
The Community Wealth Building Strategy
which was approved in March 2021 will bring
fundamental changes to how the Council
delivers its services and works with its partners
and communities. In August 2021 the
Community Wealth Building Commission
approved an action plan containing a range of
actions to progress the aspirations of the
Strategy   over a 3-to-5-year timeframe. A risk
An annual report highlighting progress over the first year
of the Strategy was presented to the Commission on  28
June 2022 for approval.
Year 2 Actions identified in the approved Action will be
progressed in 2022/2023 
53

Page 54

Areas identified in 2021/2022 Actions Quarter 4 Progress
register has been developed and approved.
Risk monitoring arrangements are in place 
8. Sustainable Development
and Climate Change
The Council acknowledges the serious and
immediate threat of climate change and is
committed to accelerating the pace of action in
response to the climate emergency and in
Scotland’s transition to a net-zero and climate
resilient society and economy.  A review of the
council’s Sustainable Development and
Climate Change Strategy (2017 to 2022) has
commenced and is scheduled to conclude
during 2022; and a new Strategy for 2022 to 
2027 was developed and presented to Council
in June 2022 for approval together with the
Council Plan and Community Plan. An Action
Plan is being developed covering the 5-year
period of the Strategy. The Action Plan will be
reviewed annually with progress updates being
reported to the Climate Change and
Sustainability Committee on a 6 monthly basis. 
A one year interim Sustainable Development and Climate
Change Strategy Action Plan is being implemented for
2022/2023, and progress on it, together with a full action
plan covering the five year period of the Sustainable
Development and Climate Change Strategy (2022 to
2027) was presented to the Climate Change and
Sustainability Committee in February 2023 for approval. 
9. Economic Strategy  The new draft Economic Strategy 2022 to 2027
has been developed and approved by Council
on 15 June 2022 as part of a suite of
documents accompanying the draft Council
Plan and Community Plan. The vision within
the Strategy is “to make South Lanarkshire a
flourishing, green, dynamic and equitable place
for communities, visitors, businesses and
investors”.  The Strategy is framed around the
3 themes of sustainable, inclusive, economic
development- People, Place and Business.
Further online consultation on the Strategy
The final community consultation exercise on the draft
Economic Strategy (2022 to 2027), was completed on 26
September 2022. Results were collated and the final
strategy was presented to Community and Enterprise
Resources Committee in December 2022. 
54

Page 55

Areas identified in 2021/2022 Actions Quarter 4 Progress
Economic Strategy Cont’d. took place during July and August. Progress
on the delivery of the Action Plan will be
measured 6-monthly with the results being
reported annually to the relevant committees.
The council will continue to lead on local
economic recovery for South Lanarkshire
businesses through promotion of local
economic support networks and contribution to
the pan-Lanarkshire Economic Forum. 
10. Implement the outcomes
following the Cross-Party
Working Group Review of
South Lanarkshire Leisure
and Culture (SLLC)
Outcomes of the Review will continue to be
implemented over the course of the 2022/2023
and include:-
• Presentation of the modernised constitution
for the new SCIO model approved by the
SLLC Board in February 2022 to the
Council for approval in 2022
A review of various Service Level
Agreements that exist for the provision of
shared services will be undertaken with the
aim of strengthening the SLC/SLLC
partnership); and Continue to engage with
community groups on community asset
transfer of SLLC assets.
Council approval of the new governance arrangements
between SLC and SLLC completed in June 2022, with
approval also received from SLLC Board. The official
conversion of SLLC from a Trust to a Scottish Charitable
Incorporated Organisation (SCIO) was completed on 3
April 2023.
A revised pricing policy was agreed by the SLLC Board
and implemented from 1 April.
The review of Service Level Agreements between SLC
and SLLC is ongoing.
The Council and SLLC continue to engage with
community groups on the community asset transfer of
SLLC assets. This is facilitated through the Council’s
community asset transfer working group and supported
by the Community Engagement Team. A number of
transfer requests are being considered at the moment
with decisions based on the community benefit to be
gained. 
55

Page 56

Areas identified in 2021/2022 Actions Quarter 4 Progress
11. Recruitment and Retention
Challenges 
COVID-19 and Brexit have had a substantial
impact on recruitment and retention as the
labour market has tightened and employees
have more mobility through agile working
which is not necessarily tied to a geographical
location.  In addition some older workers have
reassessed priorities and taken up an option
for partial or full retiral earlier than they would
have done previously.
As a result there are a number of skills in short
supply nationally and this is putting pressure
on local government services.  Examples of
this include HGV drivers, procurement and
Social Care.  The impact on Senior Manager
recruitment and retention is also clear and
turnover at this level is closely monitored
South Lanarkshire Council has experienced
these issues and has  taken  appropriate
actions to address. 
• Workforce Plans were refreshed to reflect the
changed environment by 30 June 2022. 
• The updated plans were reported to the relevant
Resource Committees in September and October
2022.
• A grow your own approach is being used in key
areas (recruited graduates in Procurement and
Finance)
• Increasing social media recruitment and use of job
fairs
• Employability routes have been defined for skills
shortage areas (e.g. Social care)
• Enhanced employee support arrangements are in
place and have been reviewed for development of
existing employees 
56

Page 57

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 27 June 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Unaudited Annual Accounts 2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise members of the requirement to consider the unaudited Annual Accounts of
the Council and related Charitable Trusts
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): 
(1) that the unaudited Annual Accounts of the Council and related Charitable Trusts
to be submitted to Audit Scotland by the deadline of 30 June, be noted. 
3. Background
3.1. The Local Authority Accounts (Scotland) Regulations 2014 require the unaudited
Accounts to be submitted to the External Auditor no later than 30 June.  The
Regulations also require elected members to consider the unaudited accounts at a
meeting to be held no later than 31 August. 
3.2. The Council’s Terms of Reference deems that the Risk and Audit Scrutiny Committee
will formally consider the unaudited Accounts prior to submitting them to the External
Auditor and making them available for public inspection.   
3.3. This report provides the Council’s unaudited Accounts 2023 for Members’
consideration, (Section 4), as well as the related Charitable Accounts (Section 7).   
4. Unaudited Accounts – South Lanarkshire Council
4.1. The Council’s unaudited Accounts for 2022/2023 are a statutory document which
detail key information on the Council’s expenditure and income for the financial year
ended 31 March each year.  The Annual Accounts show a number of statements
including a Comprehensive Income and Expenditure Statement, Balance Sheet,
Movement in Reserves, Cash Flow and supplementary notes.  They will also include
the Annual Statement of Governance which is presented separately to this Committee.   
4.2. The Council’s unaudited Accounts 2023 are included as Appendix 1 to this report for
consideration.   
4.3. These unaudited Accounts will be available for public inspection between 30 June
2023 and 21 July 2023, as prescribed by the Local Authority Accounts (Scotland)
Regulations 2014.  They will be available on the Council’s website and can also be
provided to any member of the public upon request. Arrangements will be made to
provide any information requested as part of this public consultation. The unaudited
5
57

Page 58

Accounts will be on the Council’s website from 30 June 2023 until the date the audited
Accounts are published. 
4.4. Following the audit of the Accounts across the summer months, the audited Annual
Accounts will be brought back to this Committee.  The scheduled date for the
Committee to approve the audited Accounts is 26 September 2023.   
4.5. A copy of the unaudited Accounts will be circulated to all elected members for
information following submission of the Accounts to the External Auditor on 30 June
2023. 
4.6. Restatement of Monitoring Figures Reported:  The CIPFA Code of Accounting
Practice (the Code) introduced an Expenditure and Funding Analysis which must be
prepared as part of the main Accounts.  The purpose of the statement is to reconcile
the monitoring position reported to the Council’s Executive Committee, to the figures
reported in the Comprehensive Income and Expenditure Statement, which are
presented on an accounting basis. 
4.7. A monitoring report on the year-end position of the Council’s Revenue Budget was
presented to the Executive Committee on 21 June 2023.  The Executive Committee
position showed an additional year-end Revenue Budget surplus of £3.966 million. 
Committee approved that this surplus would be transferred to reserves to assist in
managing budget pressures.  This report also sought approval to transfer funds to
reserves to meet future budget pressures and commitments.  These transfers were
also approved.  The information contained in the unaudited Accounts takes into
account the year-end position reported in the Executive Committee report. 
4.8. The position shown in Appendix 2 to this report reflects all of the transfers to reserves
approved by the Executive Committee (21 June 2023), resulting in an overall
breakeven position for the year. 
4.9. Appendix 2 provides a reconciliation of this final breakeven position, as reported to the
Council’s Executive Committee (21 June 2023), to the figures included in the Council’s
Accounts 2023 (in the Expenditure and Funding Analysis Statement and the
Comprehensive Income and Expenditure Account) and include the application of
accounting entries in line with the CIPFA Code of Practice. 
5. Home Carers Job Evaluation
5.1. As of the 12 June, the position in relation to the back pay on Home Carers Job
Evaluation is now known.  A basis has been established for back-dating to October
2020.  The value of the back pay will take some time to calculate, however, these costs
will require to be included in the financial position for 2022/2023. 
5.2. As the outcome of the review was only known as this report and the Unaudited
Accounts were being finalised, it has not been possible to update the figures to reflect
the outcome highlighted above, however, a Contingent Liability has been included in
the Unaudited Accounts.  The position will be updated for the Audited version of the
Accounts.   
6. Group Accounts
6.1. At the time of writing this report, the Group Accounts 2023 were being finalised.  They
will be issued to members of the Committee before the date of the meeting.  
58

Page 59

7. Unaudited Accounts – Charitable Trusts
7.1. In addition to the unaudited Accounts for the Council, this Committee is also required
to consider the accounts of the 3 related Charitable Trusts: South Lanarkshire Council
Educational Trust, South Lanarkshire Council Charitable Trust and the East Kilbride
Information Technology Trust.  These accounts are attached in Appendix 3 for
consideration and will be e-mailed to all elected members following submission to
External Audit on 30 June 2023. They will also be available on the Council’s website
on 30 June 2023 for public inspection. 
7.2. These audited Accounts will also be brought back for approval and signature in
Autumn 2023 along with the External Audit Members’ report. 
8. Employee Implications
8.1. There are no direct employee implications from this report. 
9. Financial Implications
9.1. There are no direct financial implications arising from this report. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
11. Other Implications
11.1. The main risk associated with the Council and Charitable Annual Accounts is a
qualified audit report. The risk has been assessed as low due to the detailed
preparation in relation to the year-end process, technical training undertaken by key
finance staff and the roll out of this to Resource finance staff as appropriate.  Finance
and Resources work together to achieve key deadlines and actions set from
timetables.   
11.2. There are no implications for sustainability in terms of the information contained in this
report. 
12. Equality Impact Assessment and Consultation Arrangements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
12.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
19 June 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
59

Page 60

List of Background Papers
 South Lanarkshire Council Annual Accounts 2022/2023
 Charitable Trusts’ Annual Accounts 2022/2023
 Financial Ledger 2022/2023 and associated working papers 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O'Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:- lorraine.o'hagan@southlanarkshire.gov.uk
60

Page 61

1
5
61

Page 62

2
Contents 
Contents 
Introduction by Chief Executive and Council Leader 3
Management Commentary 4
Annual Governance Statement 19
Statement of Responsibilities 29
Remuneration Report 30
Expenditure and Funding Analysis 48
Comprehensive Income and Expenditure Statement 49
Balance Sheet 50
Movement in Reserves Statement 51
Cash Flow Statement 53  
Notes to the Financial Statements 
Note  1 - Accounting Standards Issued but Not Yet Adopted 55
Note  2 - Assumptions Made About the Future and Other Major Sources of Uncertainty 55
Note  3 - Material items and Expenditure and Income 56
Note  4 - Note to Expenditure and Funding Analysis – Adjustments Between Funding and Accounting Basis 57
Note  5 - Reconciliation of Adjustments Between Funding and Accounting Basis Shown in  the Expenditure Funding
Analysis (EFA) to Those Shown in the Movement in Reserves Statement (MIRS)
58
Note  6 - Expenditure and Income Analysed by Nature 59
Note  7 - Revenue From Contracts with Service Recipients 60
Note  8 - Adjustments Permitted Under Accounting Standards and Between Accounting Basis and Funding
Basis Under Regulations
60
Note  9 - Other Operating Expenditure 64
Note 10 - Financing and Investment Income and Expenditure 64
Note 11 - Taxation and Non Specific Grant Income and Expenditure 64
Note 12 - Movement in Usable Reserves 65
Note 13 - Balance Sheet – Unusable Reserves 67
Note 14 - Members Allowances 70
Note 15 - External Audit Costs 70
Note 16 - Related Parties 70
Note 17 - Leases 72
Note 18 - Grant Income 74
Note 19 - Events After the Balance Sheet Date 74
Note 20 - Property, Plant and Equipment 75
Note 21 - Other Assets - Intangible, Heritage and Assets Held For Sale 80
Note 22 - Capital Expenditure and Capital Financing 81
Note 23 - Short Term Debtors 82
Note 24 - Debtors For Local Taxation 82
Note 25 - Short Term Creditors 82
Note 26 - Provisions 82
Note 27 - Receipts in Advance 83
Note 28 - Public Private Partnerships and Similar Contracts 83
Note 29 - Pension Schemes Accounted for As Defined Contribution Schemes 85
Note 30 - Defined Benefit Pension Scheme 85
Note 31 - Contingent Assets and Liabilities 91
Note 32 - Financial Instruments 92
Note 33 - Disclosure of Nature and Extent of Risks Arising From Financial Instruments 95
Note 34 - Common Good 99
Note 35 - Trust Funds 100
Note 36 - Accounting Policies 101
Note 37 - Critical Judgments in Applying Accounting Policies 108  
Supplementary Statements 
Statement 1 - Housing Revenue Account Income and Expenditure Statement  109
Statement 2 - National Non-Domestic Rates Income and Expenditure Statement 111
Statement 3 - Council Tax Income and Expenditure Statement 112  
Group Accounts 113
Audit Opinion 126
Glossary of Terms 127 
62

Page 63

3 
Joint Introduction by Chief Executive and Council Leader 
Thank you for taking the time to read the annual accounts for South Lanarkshire Council for the financial year 2022-2023.
We publish our accounts every year to clearly demonstrate how we use the public money with which we are entrusted to efficiently
deliver the best possible services. The accounts also show how we meet our legal obligation to balance our budget.
As such, they reinforce our commitment not only to best value but also to public accountability, especially at a time when the public
sector, and local authorities in particular, are facing very real financial and other challenges.
Three years after the start of the Covid-19 pandemic the council, like the country, still has a long way to go on the road to recovery.
There continues to be a significant impact on some services, and there are also ongoing costs related to the pandemic and our
recovery. With specific Covid-19 funding now at an end, this is a contributory factor to our wider financial issues.
We have faced financial challenges for many years, with substantial shortfalls between what we need to deliver our services and our
income, more than three-quarters of which is funding from the Scottish Government. These issues were compounded through 2022-23
by the cost-of-living crisis and double-digit rises in inflation, while our real terms funding has reduced.
Just like companies and householders, the council faced large increases in costs, for example for energy to heat our care homes and
food for our school meals. In addition, we have had to contend with large rises in costs for construction and across a wide range of
contracts.
These pressures are not forecast to ease in the short to medium-term, and indeed South Lanarkshire Council’s funding gap over the
next two financial years, up to the Spring of 2025, is estimated at £55 million. This follows five years in which a total of £155 million has
had to be found in savings to balance the budget.
Of course, despite such pressures it is our statutory duty to report a balanced budget, and the council’s 2022-23 revenue budget of
£835.14 million and our associate spending plans were agreed at a meeting of the full Council on 23 February 2022.
Education remains our largest area of spend, with our young people continuing to be taught in our fantastic estate of new and
refurbished nurseries, primaries and secondary schools. The second biggest area of spend is Social Work, with the remainder of our
budget funding Community and Enterprise, Housing and Technical, and Finance and Corporate Resources.
The full Council also approved two major capital programmes to invest a further £82.284m in General Services and another £52.230m
in our housing programme. Despite the financial challenges being faced, the 2022-23 budget also identified a number of one-off
investments.
These included early intervention to promote the wellbeing of vulnerable children and young people, a programme of pavement
improvements, and a campaign to tackle the scourge of fly-tipping. Some of this funding was also redirected to support residents and
communities cope with the cost-of-living crisis, including our Warm Welcome scheme that provided places for people to go during the
colder months.
Our ability to respond effectively to these issues is possible because of the council’s sound financial planning. The other absolute
essential element to this is the invaluable effort we see on a daily basis from the council’s fantastic workers as they deliver all of our
services.
We are very proud of, and greatly value, our staff. This was reinforced by the New Deal for Employees, which made them the first in
Scotland to have the “right to disconnect” outside of their working ours. An additional wellbeing day’s leave was also provided in 2022,
and conditions were enhanced around paternity leave and to support those who experience loss during pregnancy or who are
undergoing fertility treatment.
Although these annual accounts cover 2022-23, it is worth noting that even in the current difficult economic conditions, new
investments continue in 2023-24. These include additional resources to combat fly-tipping and graffiti, more investment in safe routes
in communities, including drainage and streetlighting, and to extend £130 clothing grants to cover eligible 3 and 4-year-olds in early
learning establishments.
Our full Council also agreed to kickstart a planned £13m Leisure and Culture Transformation Fund that will modernise local facilities,
optimise their use and contribute towards the council’s climate change responsibilities. Additional funding has also been made
available to our partners South Lanarkshire Leisure and Culture, as it deals with its own budget pressures and transitions its business
model.
We have been able to do this while retaining South Lanarkshire’s position of having the lowest council taxes in mainland Scotland. As
ever, we must thank our residents for understanding the challenges we continue to face, and for working with us to make sure South
Lanarkshire remains a great place to live, learn, visit, and to do business.
On that theme, we can report that there is a steady flow of people who want to live in South Lanarkshire and benefit from its excellent
schools, our good roads and wider connectivity advantages – and, most of all, to be part of the thriving communities in our rural and
urban areas.
The council will continue to support our area’s growth by delivering excellent services and through what investment we can afford,
including our Community Growth Areas. We are proud to do this because, as we like to say, “WE are South Lanarkshire.”  
63

Page 64

4
South Lanarkshire Council – Management Commentary 
Background 
The Management Commentary will provide the reader with key messages in relation to the council’s year-end financial position and
also its performance for the year 2022/2023. As well as providing a summary of 2022/2023, this commentary also looks forward and
provides a summary of the council’s future financial plans and the challenges, risks and uncertainties it faces, while trying to maintain
service delivery and meet the needs of the people of South Lanarkshire.  This includes reference to the climate change agenda. 
Before this, the commentary will provide a brief introduction to the council area and its functions as well as its key ambitions and
achievements. 
Introduction to South Lanarkshire Council 
The Area
The South Lanarkshire area is both urban and rural and covers 686 square miles from the Cathkin Braes to the Pentlands and down
through the Southern Uplands. The council faces the dual challenge of catering for the busy towns in the north west (East Kilbride,
Hamilton, Cambuslang and Rutherglen), while meeting the needs of residents in Lanark and the rural Clydesdale area. 
The Council Structure
The council provides a range of essential public services across the area through its five Resources, facilitated by the commitment,
dedication and ability of our 16,122 employees.
The council’s five Resources, their functions and number of employees is detailed below:
Council Resource  Functions Employees
Community and Enterprise
Resources 
Facilities, Waste and Grounds, Leisure and Culture Services,
Planning and Regulatory Services, Enterprise and Sustainable
Development, Roads Transportation and Fleet
3,413
Education Resources  Early Years, Schools, Quality and Improvement 7,459
Finance and Corporate Resources  Finance, Information Technology, Personnel, Administration, Legal
and Licensing, Communications and Strategy
955
Housing and Technical Resources Housing and Property Services 1,436
Social Work Resources  Adults and Older People, Children and Families, Criminal Justice 2,859 
The Council’s 5 Resources serve around 320,000 people.  This population is expected to both grow and age with projections suggesting
that this population will rise c325,000 in 2028, an increase of 2% since 2018.  This compares with a projected increase of 1.8% for
Scotland as a whole.  The projected 2028 figures show the largest decrease of 4.1% in the 0-15 age group and the largest increase of
25% in the 75+ age group.  A further 0.8% increase is projected for the years 2028 to 2038. 
Source: National Records of Scotland
The Council’s overall population growth is around a tenth faster than is projected in Scotland as a whole and its share of Scotland’s
population rises from 5.87% in 2018 to 5.88% in 2038.  South Lanarkshire is expected to have the 5th highest population out of the 32
council areas in Scotland in 2028. 
These changes in population in terms of both number and age profile, influence how the council and its partners shape future service
design and delivery and feed into the Council Plan.  
64

Page 65

5 
City Region City Deal
The council is part of the Glasgow City Region City Deal partnership.  The council’s capital programme, referred to later in this
commentary, includes significant infrastructure projects which will bring economic benefit to the council area.  These projects include
the previously completed Cathkin Relief Road and the recently completed dualling of Greenhills Road in East Kilbride.  It also includes
numerous Community Growth Area (CGA) projects across the 4 CGAs: Hamilton, East Kilbride, Larkhall and Newton including some
large-scale build projects such as a new Primary School and Nursery provision in Jackton.   
The Council Plan 
The Council Plan, Connect is the key strategic document that shapes the work of the council. It sets out the key actions to be delivered
over five years, around a long-term vision supported by core values and priorities that influence how the council works. These in turn
stretch out into all annual Resource Plans through what is known as the “golden thread”, and on further to Service Plans, and through
personal development plans, on to the individual members of staff who are responsible for service delivery. 
A new Council Plan for the period 2022-27 was approved by the council on 15 June 2022. 
In line with the BVAR recommendations and to further align the work of the council and the partnership, the new Plan sets out a
common vision – to improve the lives and prospects of everyone in South Lanarkshire – and a common set of outcomes, developed
through an extensive and multi-layered engagement and consultation process. 
The new Council Plan and Community Plan were built using engagement to place residents’ views and aspirations front and centre. At
the close of the engagement period in August 2021, more than 3,300 responses had been received, representing the largest
consultation exercise ever carried out by the council. 
Three cross-cutting themes emerged from the community responses and feedback, and these became the priorities for the new Plan. 
These were: People (in particular, the impact of poverty and inequalities), Progress (in particular, recovery from the pandemic) and
Planet (in particular, sustainable development). 
Further analysis of what our residents and communities had told us they want, resulted in six outcomes being identified for the Council
Plan and the Community Plan: 
Communities and Environment
Caring, connected, sustainable communities 
Education and Learning
Inspiring learners, transforming learning, strengthening partnerships 
Health and Wellbeing
People live the healthiest lives possible 
Children and Young People
Our children and young people thrive 
Housing and Land
Good quality, suitable and sustainable places to live 
Our Economy
Thriving business, fair jobs and vibrant town centres 
Council Performance 
The council rates its performance using a number of measures. These are aligned to the priorities and outcomes set out in the Council
Plan. A total of 234 measures were identified within Resource Plans for 2022/2023. Of those 66 (28%) are linked to the achievement of
the Connect Outcomes detailed in the Council Plan. The measures are detailed within the individual Resource Plans and bi-annual
progress reports, and can be found on the Performance pages of the council’s website. 
In addition, the Connect 2022-27 Quarter 4 Progress Report 2022/2023 will be reported to the Performance and Review Scrutiny Forum
on 8 August 2023. 
The performance figures for the first 2 quarters of 2022-23 are shown below. 
Status of performance measures Number of performance measures
Blue (Complete – projects only) 2
Green 46
Amber 6
Red  1
Report later/contextual 11 
65

Page 66

6 
Status of council performance measures 
The ‘red’ status measure relates to the percentage of total household waste that is recycled. The target of 50% was not achieved
(actual to Q2 40.3%) due to higher residual waste tonnages collected at the kerbside due to Covid-19 and homeworking, high residual
waste content in bulk uplifts (black bag waste accepted), and more non-recyclable waste being disposed of in Household Waste
Recycling Centres. 
Despite the return of services through the council’s Recovery Plan there is a Covid legacy in terms of a residual impact on some
services and a significant build-up of demand, as a result of which there remains an inevitable impact on performance in some areas. 
This accounts for most of the 6 ‘amber’ status measures.
The council continues to remain an active participant in the Local Government Benchmarking Framework (LGBF). As well as
allowing the council to self-assess its performance across years, the main benefit of the LGBF is the ability to compare performance
with peers against an agreed suite of performance indicators, which will assist in achieving best practice and efficiencies. 
The latest results available (2021/2022, as at 31 January 2023) show that across the 99 indicators in that year’s suite, the council’s
performance improved against 35 (35%) indicators, remained the same against 3 (3%) indicators, and declined for 39 (40%) indicators.
There are 22 (22%) indicators for which there are no results or trend information available for 2021/2022.
Council performance against 99 indicators (latest available information – 2021/2022) 
KEY:
Number (%) of indicators
South Lanarkshire performance 2019/20 2020/21 2021/22
↑ improving performance in SLC 35 (39%) 36 (38%) 35 (35%)
↓ declining performance in SLC 45 (49%) 36 (38%) 39 (40%)
↔ No change in performance in SLC 1 (1%) 2 (2%) 3 (3%)
--- Results/trends not available 10 (11%) 21 (22%) 22 (22%)
Comparison with Scottish average   
✓ SLC results better than Scottish average 42 (46%) 37 (39%) 41 (42%)
X SLC results worse than Scottish average 39 (43%) 37 (39%) 34 (34%)
↔ SLC results same as Scottish average 0 (0%) 0 (0%) 2 (2%)
-- Results not available 10 (11%) 21 (22%) 22 (22%)
2019-20 Results at May 2021 refresh
2020-21 Results at May 2022 refresh
2021-22 Results at 31 January 2023 
In terms of South Lanarkshire’s figures relative to the Scottish results, our performance was better than the Scottish average for 41
indicators (42%) and worse for 34 indicators (34%). 
66

Page 67

7
67

Page 68

8 
Financial Performance
General Fund Position at end 2022/2023 
The council’s General Fund budget for 2022/2023 was approved by the Council on 23 February 2022. This is the operational budget of
the Council.  At the end of 2022/2023, the Council’s budget was showing an underspend position of £51.300 million.  After making a
number of agreed Transfers to Reserves totalling £51.300 million, the final position was a breakeven position.  The full position for the
council’s Resources is detailed in the Revenue Budget Outturn 2022/2023 reported to the Executive Committee on 21 June 2023. This
position takes account of the achievement of £1.985 million of the £2.235 million of approved savings for the year, with the remainder
being pursued into 2023/2024.  
The split of the spend across the individual Resources is shown below. This reflects the council’s spend based on its operational
structure (including transfers to reserves), with the biggest Resource being Education Resources. The budget is monitored internally on
the basis of the five Resources.  Council spend across its five Resources (£m) is noted in the diagram and table overleaf.
68

Page 69

9 
Council Resource Spend
(After Transfers
to Reserves)
£m
Community and Enterprise Resources  129.410
Education Resources 410.918
Finance and Corporate Resources 49.019
Housing and Technical Resources 19.033
Social Work Resources 216.093 
This spend against budget is shown in the South Lanarkshire Performance Section of the table below, which shows the Resources’
final outturn position before any transfers were made to reserves for specific funding or commitments. The main variances are
explained as: 
• Community and Enterprise Resources:  an underspend £1.555 million offset by monies carried forward into 2023/2024 for
committed spend, includes additional income from waste and planning and building standards.
• Education Resources:  an underspend of £1.311 million was due to the timing of spend on multi-year programmes such as
Early Learning and Childcare and Pupil Equity Fund. These monies will be carried into 2023/2024. 
• Finance and Corporate Resources:  an underspend of £0.978 million was due to the timing of receipt of external funding,
which will be carried forward for use in 2023/2024.
• Housing and Technical Resources:  a minor overspend of £0.005 million.
• Social Work Resources:  an underspend of £5.635 million mainly reflecting an underspend in Adults and Older People. 
Social Work is also experiencing an overspend on Children and Families due to residential placement pressures.
• Loan Charges:  an underspend of £4.721 million reflecting lower than anticipated interest costs as a result of taking a lower
amount of long-term borrowing than previously anticipated during 2022/2023.
• Council Tax/Council Tax Reduction Scheme (over-recovery £4.793 million) mainly the impact of additional houses added
in-year as well as higher than anticipated level of income from previous years arrears collection and additional income from
empty properties. 
The Comprehensive Income and Expenditure Statement of the Accounts (page 49) sets out the council’s year-end position on ex-
penditure and income, in accordance with accounting requirements.  This is different to the way that the council reports its financial moni-
toring internally as we are required to make a number of accounting adjustments. The Expenditure and Funding Analysis (EFA) on
page 48 provides a link between the council's internal financial monitoring reports, and the figures in the Comprehensive Income and
Expenditure Statement. 
Table 1 shows the reader of the Accounts how to go from the internal Monitoring Report, through to the first column of the EFA (page 48)
and then on to the Comprehensive Income and Expenditure Statement (page 49). 
69

Page 70

10 
SLC
Annual
Budget 
(Col 1) 
SLC
Actual
Outturn 
(Col 2) 
SLC
Outturn
Variance 
(Col 3)
Building
the EFA
Actual
Outturn 
(Col 2 Data) 
Building
the EFA
Move /
Remove
items not
included in
Cost of
Services
Building 
the EFA
Net
Expenditure
Chargeable
to the
General
Fund and
HRA
Services 
£m £m £m £m £m £m
Community and Enterprise 129.435 127.880 1.555 127.880  127.880
Education  410.918 409.607 1.311 409.607 - 409.607
Finance and Corporate 49.019 48.041 0.978 48.041  48.041
HRA - - - - 3.990 3.990
Housing and Technical  18.953 18.958 (0.005) 18.958 - 18.958
Social Work  216.093 210.458 5.635 210.458 - 210.458
Joint Boards 2.152 2.152 - 2.152 - 2.152
Corporate Items - (0.469) - (0.469)  (0.469)
Net Cost of Services 826.570 816.627 9.474 816.627 3.990 820.617
Other Income and Expenditure (826.570) (867.927) 41.826 (867.927) 71.755 (795.172)
(Surplus) / Deficit on Provision
of Services
- (51.300) 51.300 (51.300) 75.745 25.445 
The council’s final reported outturn position for the year is a breakeven position (surplus of £51.300 million, if you exclude the transfers
to reserves at the end of the year – see col 2 above).  However, as previously noted, this is not how the surplus is displayed in the
various statements in the accounts due to accounting requirements to both exclude and include certain items for both the EFA and
CIES, with the final entries being included as part of the Movement in Reserves Statement. 
The final column in the table shows a surplus of £25.445 million which corresponds to the figures in the first column on the Expenditure
and Funding Analysis on page 48. To this, accounting regulations require us to add in other entries for items including pensions,
holiday pay, capital financed from revenue and loans fund principal payments (column 2 on EFA page 48) to arrive at a deficit on the
provision of services of £51.300 million. To this, we need to take into account accounting requirements to reverse some entries to the
balance sheet and also transfers from reserves which were required to fund projects during the year and transfers to reserves at the
end of the year which are required to fund commitments in future years.  After taking into account all of these items, the final outturn
position for the council was a breakeven position, as reported to the Executive Committee. 
Social Care (Home Care) Job Evaluation
The outcome of a recent Job Evaluation exercise for Home Carers will result in significant recurring costs for the Care at Home service
that is delegated to the IJB in 2023/2024 and beyond. The annual costs of grade changes will be approximately £7m.  
The Financial Regulations of the IJB state that if an overspend is forecast on either Parties in scope budget, the Chief Officer and the
Integration Joint Board’s Chief Financial Officer will aim to agree a recovery plan with the relevant Party to balance the overspending
budget and to determine the actions required to be taken by the IJB to deliver the recovery plan.
In addition to the recurring costs, at a meeting of South Lanarkshire Council on 24 May 2023 it was asked that a review took place in
relation to the implementation date of the outcome.  Whilst the outcome of the Job Evaluation stated that grades were to change from 1
April 2023, there was the possibility that this review would change that outcome and back dated pay would require to be paid out.  These
costs would be in relation to Home Carers and therefore the costs are part of the services delegated to the IJB.  
As of the 12 June the outcome of the review is now known.  A basis has been established for back-dating to October 2020.  The value of
the back pay will take some time to calculate, however these costs will require to be included in the financial position for 2022/2023.  As
the outcome of the review was only known as these Annual Accounts were being finalised, it has not been possible to update the figures
to reflect the outcome in relation to the above, and a Contingent Liability is included in these Accounts to acknowledge the position (page
91).  The quantification of the full costs of the backdated pay has commenced and the result will be included in the audited version of the
Annual Accounts.  
Accounting for Service Concessions
The Scottish Government’s 2022 Resource Spending Review contained details of a Service Concession Arrangement (SCA) flexibility
that related to the Council’s PPP schools.  The flexibility permits councils to undertake internal accounting changes that extend the period
over which the principal repayment of the unitary charge can be made, resulting in a one-off credit to the General Fund (shown in the
Movement in Reserves Statement) and ongoing annual savings for a period of time. In the remaining years following the end of the
SCAs, the rescheduled debt repayments continue until the debt liability has been extinguished. 
The annual unitary charge will continue to be paid to the contractor over the contract period. The guidance applies to principal and not to
interest, service charge costs or grant. These will continue to be accounted for over the contract period.  
The Council has applied the permitted change in the calculation of the statutory charge in 2022/2023 and the adopted approach has
been applied across the Schools PPP and the Glasgow Southern Orbital financial arrangement. This has resulted in a credit of £64
million in 2022/2023, which can be used to support future budget pressures. 
70

Page 71

11
The Movement in Reserves Statement on page 51 reconciles the financial position shown in the Comprehensive Income and
Expenditure Statement (page 49) to the movement on the council’s Reserves (pages 65 to 69).   
During the year, the council drew money down from reserves, to meet current commitments or for agreed use in the 2022/2023 budget
strategy, including Pupil Equity Fund for schools, Information Technology and funding for multi-year projects.  In addition, the council
made contributions to reserves for a variety of projects including Pupil Equity funding and Early Years expansion to meet future
commitments. Money was also set aside for future budget strategies. 
The balance on the council’s total General Fund Reserve is £160.783 million and includes commitments for future projects as well as
elements earmarked for use in future budget strategies. The General Fund Reserve is one of the statutory reserves that the council is
permitted to hold and is included in the total usable reserves on the Balance Sheet totalling £187.441 million. A summary of the
councils’ total usable reserves is shown in the table below, with full details of all the council’s usable reserves, including transfers to /
from each of these reserves in 2022/2023 are detailed in Note 12. 
£000 £000
Total Usable Reserves  187,441
Less:  
General Fund (committed inc. budget strategies) 147,740 
Repairs and Renewals (inc. Winter Maintenance) 7,610 
Capital Funds (inc. Capital Receipts Reserve) 4,776 
Insurance Fund 1,411 
Housing Revenue Account 12,861 
Total Committed Usable Reserves  174,398
Uncommitted General Fund  13,043 
Note 12 shows that the council’s General Fund reserve comprises an earmarked element (£144.985 million) and an unearmarked
balance of £15.798 million, with £2.755 million of this being approved for future budget strategies leaving £13.043 million uncommitted. 
The council’s Reserves policy identifies that there is no prescribed minimum level of reserves which should be held by a council.  The
level of Uncommitted General Fund of £13.043 million currently reflects a suitable cushion to contribute towards any unanticipated
pressures that the council may face. 
Housing Revenue Account
As well as running a General Fund account to deliver services, the council also manages a stock of housing.  The annual expenditure
on the council houses (£116.578 million in 2022/2023) and the total income received (£112.586m in 2022/23), are held as a ring-fenced
Housing Revenue Account (HRA).  Any surplus funds are held in a Reserve on the council’s balance sheet and can be used in future
years.  The details are shown on pages 109-110.
At the end of financial year 2022/2023, there was an overspend of £3.990 million on the Housing Revenue Account.  This was funded
from the Housing Revenue Account Reserve.  The Reserve was also increased by £0.540 million for income received through Council
Tax from owners of second homes.  These monies are ring-fenced for social housing.  These transfers mean a decrease of £3.990
million in the Housing Revenue Reserve, taking its total to £12.431 million at the end of 2022/2023.
These monies will be carried forward to future years to fund the ongoing impact of welfare reform, the development costs related to the
new housing management I.T. system and the continuation of the housing investment programme, as well as maintaining a reasonable
level of reserves.
The council has a medium to long term financial business plan for the HRA.  This ensures the affordability of the council’s approved
Strategic Housing Investment Programme (SHIP), a key part of the Local Housing Strategy (LHS) process. The strategic outcomes
identified in the LHS, guide investment priorities outlined within the SHIP, including the increase in supply of affordable housing in
areas of housing pressure, as well as coping with the needs of an ageing population. 
The Balance Sheet
Taking the year’s activity into account, the council’s balance sheet (page 50) shows the position as at 31 March 2023 and brings
together the council’s year end balances including the assets owned, the monies owed to and by the council and the reserves available
to the council for use in future years.
The position at the end of March 2023 as well as the previous year for information, is shown below.
71

Page 72

12 
The main change year on year is the increase in Long Term Fixed Assets (Property and Pension Asset) which reflects the Council’s
spend on its property assets, an increase in the value of its council housing stock and a new Pension Asset following actuarial review of
the Fund.  The long-term liabilities decreased mainly due to a reduction in the pension liability which was offset by an increase in long
term borrowing reflecting the implementation of the accounting treatment of Service Concession arrangements (PPP and similar con-
tracts).  
This is the first time that the Council is showing a net Pension Asset.  This is made up of a Pension Liability which is more than covered
by a significant Pension Asset.  
The Pension Liability is indicative of a broad position, however the reader should be aware that the council is meeting its pension costs
on an annual basis. This Liability is more than offset by a significant Pension Asset which while presented on the Council’s Balance
Sheet, is not readily available for the Council’s use.  
Assets of the Strathclyde Pension Fund are ordinarily included in the Balance Sheet at their fair value (current bid prices as required
under IAS19), principally the bid price for quoted securities, estimated fair value for unquoted securities and market price for property. 
However, while the accounting requirements of IAS19 have been applied in the current year, the significant nature of the Asset has
been reviewed, and in line with IFRIC14, the asset has been de-recognised to equate to the level of the asset ceiling, provided by the
Fund’s actuary.  This reflects the net present value of future service costs less the net present value of future obligations over the future
working lifetime as at 31 March 2023.  Further information is provided in Note 30 (pages 85-90).
The council’s assets and liabilities are funded by an equivalent level of Reserves.  These Reserves comprise Unusable Reserves of
£2,400.1 million (maintained for accounting purposes only) and Usable Reserves of £187.4 million which as the name suggests, are
those which the council can use to support service delivery through its Revenue and Capital budgets. The detail of these Reserves is
noted in the Movement in Reserves Statement on page 51 with more detail provided in Note 12 (page 65) and the Accounting Policies
(pages 100 to 108). 
It is expected that future revenue income, alongside the council’s budgeting and planning processes, will ensure management of future
liabilities. It is therefore considered appropriate to adopt a going concern basis for the preparation of these financial statements.
Capital Programme
The council operates two distinct capital programmes: the General Services Capital Programme and the Housing Capital Programme. 
The spend across Resources and Housing is shown in the graphic (and the table) below. 
72

Page 73

13 
Council Resource Spend
£m
Community and Enterprise Resources 36.324
Education Resources 15.342
Finance and Corporate Resources 4.977
Housing and Technical Resources 4.883
Social Work Resources 4.210
Housing Capital Programme 60.695 
The General Services Capital Programme spend was £65.736 million in 2022/2023, equating to approximately 69% of the original
capital budget approved at the start of the financial year.   
The underspend reflects a variation from the expected timing of spend across a number of projects within multi-year programmes.  The
main projects contributing to the underspend include the Place Based Investment Projects, Roads Investment Programme, Roads
Participatory Budgeting, Clyde Bridge, Cycling Walking and Safer Routes, EK Civic Relocation/Near to Home, Roads City Deal,
Education ASN / Mainstream Adaptation and Prioritised Urgent Investment. 
Significant project spend during the year has been incurred on a number of build projects including: 
• Jackton Primary School,
• Roads Carriageway Investment Programme,
• Newton Farm Primary School Extension,
• Oracle Fusion Project and Schools ICT and
• Blantyre Life. 
The extended Newton Farm Primary School and the new Blantyre Life are shown in the images below. 
The General Services Programme has been funded from a combination of grants from various funding bodies (including Scottish
Government), partner organisations (£43.871 million), borrowing (£19.042 million) and developers’ contributions (£0.059 million). 
The Housing Capital Programme spent £60.695 million in 2022/2023, 91% of its revised budget target. This underspend is due to a
number of factors, mainly, property services operatives being diverted to tackle the impact of bad weather in December which resulted
in flooding damage to a number of Council properties and delays in relation to the expected milestone payments for the Kirk Street,
Strathaven new build project.
The focus of Housing Capital Programme expenditure on council housing stock was on the provision of additional housing and
improvement and environmental works. The Housing Programme is ring-fenced and funded by the Housing Revenue Account,
Government Grant, Borrowing and house/land sales. 
The newly completed housing in Larkhall is shown in the image overleaf.
73

Page 74

14 
The Capital Budget Monitoring Final Outturn – 2022/2023 for both Programmes was reported to the Executive Committee on 21 June
2023. 
The council is able to regulate its own capital spending limits within a Prudential Framework recommended by CIPFA and endorsed by
the Scottish Government. As such, the repayment of borrowing, which falls as a future commitment against the council’s Revenue
Budget, must be affordable. The repayments form part of the approved revenue budget, and the spend and debt repayments remain
within the Prudential Framework limits approved by the council. The ratio of financing costs to the council’s Net Revenue Stream for
2022/2023 (Government Grant plus Council Tax Income) is 4.47%
Key Financial Ratios
In order to monitor financial performance and to supplement the figures contained within the Annual Accounts, the council prepares a
number of financial ratios as a result of best practice guidance contained within the Prudential Code for Capital Finance in Local
Authorities. These relate to the borrowing the council undertakes.
The following table provides information on these indicators: 
Financial Indicator and Commentary 2022/2023
Forecast 
£m
2022/2023
Outcome
£m
Debt/Long-term Borrowing   
Capital Financing Requirement (CFR) for the current year. 
External Debt Levels for the current year. (Excluding Accrued Interest) 
Gross Borrowing (External Debt Levels excluding PPP Finance Lease Liability) 
1,404 
1,215 
1,036
1,382 
1,215 
1,036
Ratio of Financing Costs to Net Revenue Stream (as a %) which indicates how
much of the council’s net revenue budget is used for servicing debt:
• General Services 
• Housing Revenue Account 
4.96% 
17.16% 
4.47% 
13.98% 
The Capital Financing Requirement (CFR) shows how much the council needs to borrow in order to fund its capital expenditure. The
actual CFR for the year is £22 million less than forecast due to a reduction in borrowing required to fund the 2022/2023 capital
programmes.  This reflects the timing of spend across both capital programmes (General Services and HRA). 
The ratio of financing costs to net revenue stream for General Services shows what percentage of our income from Council Tax and
Government Grant is used to pay for the costs of borrowing. For the Housing Revenue Account, the ratio shows how house rents have
been used to pay for the cost of borrowing.
For General Services the ratio is less than forecast. This is due to lower borrowing costs and the Net Revenue Stream being higher
than forecast.
For the Housing Revenue Account, the ratio is also lower than forecast due to actual borrowing costs being lower than forecast and a
slight increase in income.
Financial Planning
The current economic situation and the residual demands in the wake of the Coronavirus Pandemic means that the council continues
to operate in a climate of financial pressure.  Increasing cost burdens due to pay awards and above average contract inflation are 
reducing the spending power of grant settlements.  
Financial Planning is a key tool in managing these pressures and the council has a number of key documents which assist in this, and
includes a Long Term Revenue Budget Strategy and a Long Term Capital Strategy.  A Revenue Budget Strategy is prepared every
year along with an annual report on the Prudential Indicators, the Treasury Management Strategy and the Annual Investment Strategy.
This suite of reports lays out the position for the council across the coming years and identifies the key areas of financial risk and
pressure. The Revenue Budget Strategy for 2024/2025 was reported to the Executive Committee on 21 June 2023.
74

Page 75

15 
Financial Outlook including Risks and Uncertainties 
Outlook 
The council approved its 2023/2024 revenue budget of £910 million in February 2023. 
The council’s Budget Strategy beyond 2023/2024 indicates an expectation of financial pressure arising from a number of areas
including grant reductions, pay awards and inflation.  The overall result of these pressures is a significant budget shortfall for the
coming years, and a continued need to make savings. 
Specifically for financial year 2024/2025, the Revenue Budget Strategy was presented to Council on 21 June 2023.  This Strategy was
based on the best information available.  It assumed a flat cash position in relation to Government Grant funding (based on the Scottish
Government’s Spending Review 2022) as well as a number of expenditure assumptions for items such as pay awards, demand /
growth, and inflationary increases in PPP contractual payments and utility costs.  It also included the reinstatement of spend as a result
of previous decisions taken and with that and the benefit of corporate solutions totalling £30.895 million, the savings requirement for
2023/2024 is £29.207 million.  
Moving forward, the position for the years beyond 2024/2025 was last presented to Council in February 2023.  These estimations are
being refreshed as part of the ongoing exercise on the 2024/2025 Budget Strategy, and members will be updated later in the financial
year.  The current savings required across the coming years is summarised below: 
2025/2026 2026/2027 2027/2028 
£m £m £m
Total 39.6 20.3 11.1 
Risks and Uncertainties 
In addition to the impact and uncertainty brought about by the global coronavirus pandemic, there are a number of other risks and
uncertainties faced by the council.  
In looking at these areas of risk and uncertainty, it is important to note the council’s governance arrangements. These are detailed in
the Annual Governance Statement which sets out the proper arrangements for the governance of the council’s activities, facilitating the
effective exercise of its functions and including clear arrangements for the management of risk.  The Annual Governance Statement
can be found on page 19. 
The council maintains a Risk Register which is updated on a regular basis by senior management and is presented to elected
members.  The latest reported version of the Risk Register was the Review of the council's Top Risks/Year End Risk Management
Report reported to committee in October 2022.  The risk register is one of the key sources of assurance that inform the council’s annual
review of its governance arrangements.
The council’s Top Risks (Very High level) are detailed below.
1. Reduction in external funding and fees/income received by the Council, as well as the increased demand for services
including the residual impact of the pandemic, and the increased cost of services due to rising inflation and the cost-of-
living crisis, results in increasing budget gaps. 
This is a key risk due to the potential impact it can have on the council’s financial position. The impact is mitigated by a sound
financial planning process and good financial controls. 
2. The Council is unable to support households most impacted by the cost-of-living crisis resulting in increasing levels of
poverty, debt, and damage to health.  The focus of this new risk is on the support that the council can provide to households, but
it is important to note, with the gravity of the issue, the council’s support role is only a small part of the mitigation, with the
Government and Energy Companies playing a lead role. 
3. The Council fails to deliver the objectives of the Community Wealth Building Strategy.  This is a key risk due to the potential
impact on the council not being able to develop resilient, inclusive local economies. The impact is mitigated by a number of control
measures linked to the 5 community wealth building pillars. 
4. The Council is materially affected by the implications arising from the National Care Service Bill.  The National Care Services
(Scotland) Bill that was presented to Parliament on 20 June 2022, with the Scottish Government now committed to establishing a
National Care Service by the end of the current parliamentary term in 2026.   The council will continue to monitor developments in
this area and develop appropriate control measures where required, once more detailed proposals from the Scottish Government
are known. 
5. Disruption to Council services as a result of industrial action.  Pay claims are made that are in line with rising inflation/against
the backdrop of a cost-of-living crisis and Local Government financial constraints.  Whilst pay awards for 2022 have been agreed,
there may be potential for further industrial action when the 2023 pay awards are being negotiated. Control measures are in place
to manage disruption that arises. 
6. Failure to meet sustainable development and climate change objectives.   The council has a legislative requirement to reduce
carbon emissions, adapt to a changing climate and act sustainably to meet public sector climate change duties.  Sustainable
development and climate change is embedded within the Council Plan, Connect, as well as relevant plans, policies and strategies. 
Progress in this area is reported to the Climate Change and Sustainability Committee.  These key risks as well as the remainder of
75

Page 76

16
the council’s high-level risks are shown in the graphic and list below: 
• Reduction in external funding and fees/income received by the Council, as well as the increased demand for services including the
residual impact of the pandemic, and the increased cost of services due to rising inflation and the cost-of-living crisis, results in
increasing budget gaps. 
• The council is unable to support households most impacted by the cost-of-living crisis resulting in increasing levels of poverty,
debt, and damage to health. 
• The council fails to deliver the objectives of the Community Wealth Building Strategy. 
• The council is materially affected by the implications arising from the National Care Service Bill. 
• Disruption to council services as a result of industrial action. 
• Failure to meet sustainable development and climate change objectives. 
• Inability of the Council to effectively accommodate and support households who arrive in South Lanarkshire as part of refugee
resettlement and the asylum seeker dispersal programmes. 
• The council does not have the appropriate emergency / business continuity plans; contingency arrangements or partnerships in
place to respond to/or recover from a pandemic/endemic event.
• Procurement activity is affected by supply chain issues; a lack of resources; non-compliance or legal challenge.
• The council fails meet statutory and legislative duties in respect of public protection.
• Fraud, theft, organised crime and cyber attacks.
• Failure to fulfil emergency response commitments befitting the council’s status as a Category One (emergency) responder.
• Historic childhood abuse.
• Information governance not subject to adequate control.
• The council does not fully deliver the strategic outcomes required of the IJB as outlined in their Strategic Commissioning Plan
• IT development and functionality does not keep pace with changing service requirements.
76

Page 77

17
• Lack of capacity and skills to meet increased service demands.
• Increasing levels of adverse weather.
• Failure to ensure the health, safety and wellbeing of employees and the protection of service users and members of the public in
the delivery of council services.
• Failure to achieve the outcomes of the Community Plan.
• Failure to achieve the outcomes of the Council Plan. 
Taken together, these risks and external influences represent a fast-changing environment, bringing opportunities as well as challenges,
and driving the requirement for the council and its services to be open to new ways of working, to innovation and continuous
improvement. 
Sustainable Development and Climate Change 
Sustainable development and climate change action is governed through the council's Climate Change and Sustainability Committee
which has decision making powers to help to accelerate the pace and scale of action needed in response to the climate emergency
and meet challenging climate change national targets.
Our commitment to sustainable development begins with integrating climate considerations into our policies, plans, and decision-
making processes. Sustainable development and Climate Change is embedded within the Council Plan, Community Plan as well as
other relevant plans, policies and strategies. The council's Sustainable Development and Climate Change Strategy (SDCCS) 2017-
2022 set out our overall approach to sustainable development and challenges and opportunities of climate change.
The Climate Change (Scotland) Act 2009 has set a 2045 target for net-zero emission of all greenhouse gases, and new interim targets
of 75% reduction in emissions by 2030, and 90% reduction in emissions by 2040, relative to 1990 levels. As a public sector body, we
have a legislative requirement to contribute to these targets and are required to set and report on our own carbon reduction targets. 
We are committed to measuring, monitoring, and reporting our greenhouse gas emissions, as well as the progress we make in
achieving our carbon reduction targets. The most recent carbon footprint, for 2021-22 shows that reductions of 65% have been
achieved since the baseline year of 2005-06.
In addition to mitigating our own impact, we understand the importance of adaptation to climate change. Failure to meet sustainable
development and climate change objectives was identified as one of the council’s top risks - these risks relate to economic, social and
cultural influencers. 
Supplementary Information
Common Good and Trust Funds 
The council operates Common Good and Trust Fund accounts which record the financial transactions in relation to funds the council
administers. These do not represent charges or income to Council Tax payers.  These are shown in pages 99-100 of the Accounts.
Our Group 
The council has adopted the recommendations of the Accounting Code of Practice in the United Kingdom 2022/2023 and has
produced a full set of Group Accounts.  These accounts incorporate any material balances from identified associates of the Council,
and include a Group Movement in Reserves Statement, a Group Balance Sheet, a Group Expenditure Funding Analysis Statement, a
Group Income and Expenditure Statement and a Group Cash Flow. 
By including the Group entities along with the council’s own Accounts, the effect on the Group Balance Sheet is an increase in both
77

Page 78

18
Reserves and Net Assets of £162.982 million.  This represents the council’s share of the net assets in these entities.  The Group
Accounts, including details of associates are included in pages 113-125. There has been no change to the Group membership since
2021/2022.       
More Information
Further information about South Lanarkshire Council can be obtained on the Council’s website www.southlanarkshire.gov.uk.
Alternatively, contact Finance and Corporate Resources, Floor 4, Almada Street, Hamilton ML3 0AB   
Paul Manning
Executive Director, Finance and Corporate Resources 
Cleland Sneddon
Chief Executive 
Councillor Joe Fagan
Leader of the Council  
78

Page 79

19
South Lanarkshire Council 
Annual Governance Statement 2022/2023 
1. Scope of responsibility 
The residents of South Lanarkshire expect the council to conduct its business in a lawful and transparent way.  In particular, the council
has a duty to safeguard public money and account for it; and to continuously review and improve how its functions are discharged, focussing
on the priorities of economy, efficiency, and effectiveness. 
The council is responsible for putting in place proper arrangements for the governance of its activities, facilitating the effective exercise of
its functions including clear arrangements for the management of risk. 
A Local Code of Corporate Governance (referred to as the “Code” from here on) has been approved and adopted.  The Code is reviewed
and updated annually and is consistent with the seven core principles of the Chartered Institute of Public Finance and Accountancy (CIPFA)
and the Society of Local Authority Chief Executives (SOLACE) framework entitled ‘Delivering Good Governance in Local Government’.   
This statement explains how the council has complied with the Code during 2022/2023 and meets legislative requirements to include the
Annual Governance Statement within the Annual Accounts.  It also sets out the significant changes to the council’s governance
arrangements as a result of the global health pandemic (referred to as the “Pandemic” from here on). 
2. The purpose of the council 
The Council Plan 2022-27 sets out the council’s vision, values and objectives and what difference this will make to the residents and
communities of South Lanarkshire.   The Council Plan which was informed by the views of South Lanarkshire residents and information
from many other sources including local community plans, face to face discussions, online feedback, feedback from Community Groups,
Community events and surveys was approved by Council in June 2022.  
The council is also a statutory Community Planning Partner and the Community Plan 2022-32 provides a common vision for the South
Lanarkshire Community Planning Partnership and sets out how the partners aim to achieve that vision.   
The council has set the framework for strong corporate governance by having a clear vision and values which are outlined below: - 
Our vision is to improve the lives and prospects of everyone in South Lanarkshire.
Our priorities are:
• People – we will work to put people first and reduce inequality.
• Progress - we will work to recover, progress and improve.
• Planet – we will work towards a sustainable future in sustainable places.
Our outcomes will be:
• Communities and environment - Caring, connected, sustainable communities.
• Education and learning - Inspiring learners, transforming learning, strengthening partnerships.
• Health and wellbeing - People live the healthiest lives possible.
• Children and young people - Our children and young people thrive.
• Housing and land - Good quality, suitable and sustainable places to live.
• Our economy - Thriving business, fair jobs and vibrant town centres.
Our values are:
• Focused on people and their needs
• Working with and respecting others
• Accountable, effective, efficient and transparent
• Ambitious, self-aware and improving
• Fair, open and sustainable 
• Excellent employer 
79

Page 80

20
3. The purpose of the council’s governance framework 
The governance framework comprises of the culture, values, systems, and processes by which the council is directed and controlled.  It
describes the way the council is accountable to communities.  It enables the council to monitor the achievement of its strategic objectives
and consider whether these objectives have led to the delivery of appropriate and cost-effective services. 
The system of internal control is a significant part of that framework and is designed to manage risk to a reasonable level.  It is based on
an ongoing process designed to identify and prioritise the risks to the achievement of the council’s aims and objectives by evaluating the
likelihood and potential impact of those risks being realised.  This enables the council to manage risk efficiently, effectively, and
economically. 
The governance framework has been in place at South Lanarkshire Council for the year ended 31 March 2023 and up to the date of
approval of the Annual Report and Accounts. 
4. How the council monitors and evaluates the effectiveness of its governance arrangements? 
The council annually reviews the effectiveness of its governance arrangements.  The key sources of assurance that inform this review and
underpin the statements made within this document are shown in the diagram below.   
5.  Key elements of the council’s governance assurance framework 
The council aims to achieve good standards of governance by adhering to the seven national principles below, which form the basis of
the council’s Code.  These principles are used each year to evaluate governance arrangements and identify areas for improvement.   
80

Page 81

21 
The following table demonstrates how the council has complied with these principles and provides assurance as to how they are met. 
Significant elements of the systems and processes that comprise the council’s governance arrangements and important changes/
developments are described.  Links to the key council documents referred to below can be found in Section 2 of the Code.  The impact of
the Pandemic has been included and additional commentary can be found at the end of this section.  Commentary on the council’s level
of compliance with the CIPFA Financial Management Code can also be found at the end of this section.   
Principle A: Behaving with integrity, demonstrating strong commitment to ethical values, and respecting the rule of law
Links to Council’s values:
• Accountable, effective, efficient, and transparent; Working with and respecting others
How we do this:
• The Council’s values and objectives provide clear direction to councillors and employees and are embedded in all policies
and processes.
• Standards of conduct and integrity were promoted through the national Code of Conduct for Councillors and by the
Standards and Procedures Advisory Forum.  This is supplemented by role profiles which have a core accountability to
maintain the highest standards of conduct.  
• The employee Code of Conduct outlines standards of conduct and integrity.  All breaches including reported cases of
suspected unethical behaviour and non-compliance with the law/policy were investigated through the employee disciplinary
process and the recommended actions taken. 
• Professional Codes of Conduct ensured that ethical standards were maintained, and all breaches were investigated by the
governing body.  
• To support integrity in decision making, the Council has a number of Committee procedural documents including decision
making protocols known as the Scheme of Delegation, terms of reference documents, standing orders on procedures and
contracts and financial regulations. 
• To ensure openness and transparency agendas and Committee reports are published to the council website at least five
working days ahead of the scheduled meeting dates and any minutes of decisions taken by the Chief Executive during any
period when committee meetings are suspended are publicised on the Council website. Committee meetings are live
streamed to the Council’s YouTube channel.  
• To ensure openness and transparency in decision making processes, all declarations of interest made by councillors at
meetings were recorded and made available online.  
• There are a range of policies such as the Counter Fraud, Bribery and Corruption Policy Statement and Strategy, Fraud
Response Plan, Whistleblowing for Third Parties and Confidential Reporting procedures.  These continue to be updated
to reflect best practice and support a culture of ethical behaviour amongst employees and councillors.  
• Health and Safety compliance during 2022/2023 was assessed as being within the top rating band of “good”.
• Legal Services maintained an overview of legislation and regulations and worked with services to ensure compliance. 
81

Page 82

22
Principle B: Ensuring openness and comprehensive stakeholder engagement
Links to Council’s values:
Accountable, effective, efficient, and transparent; Fair, open, and sustainable; Focused on people and their needs; Working
with and respecting others
How we do this:
• To ensure transparency and openness in decision making processes, all agendas, reports, and decisions were published
on the Council’s website and printed copies were available for public inspection for all Committee and Forum meetings
(except the Standards and Procedures Advisory Forum).  From April 2021 all Committee meetings were live streamed to
the Council’s YouTube channel http://bit.ly/SL_Committees. From August 2021 all Forum meetings have been live
streamed.
• The Committee Management Information System allows members of the public to register and be notified when Committee
and forum papers are published.  The system also facilitates the creation of online petitions to increase the potential reach
of signatories.
• The work of the Council and key information from our partners is communicated regularly using a range of communication
channels.  The South Lanarkshire View pages on the Council website provide a dedicated source of local information and
news for communities.  A variety of social media channels are used to communicate updates and share information.    
• A suite of dedicated Pandemic pages providing advice, help and public health information were created and maintained
on the council website. 
• A ‘Let’s Talk South Lanarkshire’ campaign has been established and was used to engage local people in an initial
discussion about their experiences of the pandemic and continues to be used for ongoing dialogue with communities on
both the Council and community planning priorities.
• The Council’s Community Engagement Team continue their work to increase stakeholder engagement and involvement in
decision making processes through the continued development of new Community Planning Partnership Neighbourhood
Plans which are aimed at improving outcomes and reducing inequalities. 
• The Community Planning Partnership published its first Community Participation and Engagement Strategy 2020 to 2025
which is also available online in BSL and the Council has produced an online course for employees to complement this. 
• A partnership Participation and Engagement Group has been established to ensure that there is a consistent and co-
ordinated approach to engaging with communities.
• The Council carried out circa 50 surveys and engagement activities with residents, employees, and partners, and through
the council’s Citizens Panel to inform policy and service delivery.  Further information on our surveys is published on the
Council’s website. 
• To ensure inclusivity and help shape service delivery, the Council co-ordinates regular engagement with targeted groups
of people such as young people, older people, people with disabilities, unpaid carers, black and ethnic minorities, etc. 
Groups considered items such as the budget consultation, rent setting and performance reporting.  
• The Participation Requests and Community Asset Transfer processes support communities to engage with the Council to
improve local outcomes. 
• The Council’s performance Spotlights summarise what the council has achieved and the Public Performance Reports
provide a comprehensive overview of service performance.  These, along with the council’s Benchmarking report demon-
strate the council’s commitment to continuous improvement and achieving Best Value; summarise the progress that the
council has made in meeting its priorities and how it is performing locally and nationally.
• The Council’s Digital Inclusion Strategy 2020 to 2023 sets out the actions that the Council is taking to assist those people
who are unable to get online to access services digitally.  The Council also leads on a partnership Digital Inclusion Group. 
• A comprehensive range of information on how the Council operates is available on the website.  The Freedom of
Information Publication Scheme ensures that key information about how the council works is accessible to the public.  
Principle C: Defining outcomes in terms of sustainable, economic, social, and environmental benefits 
Links to Council’s values:
Accountable, effective, efficient, and transparent; Fair, open, and sustainable; Focused on people and their needs
How we do this:
• The Council adapted approaches in response to the Pandemic to ensure processes continued to be effective, efficient,
and transparent. 
• The Council has a Capital Strategy that has a long-term outlook on future capital investment (up to 2027/2028).  This
document is underpinned by a suite of Asset Management Plans which are aligned with the council’s objectives and focus
on creating an efficient, fit-for-purpose and sustainable core estate that delivers best value in terms of investment, running
costs and environmental impact.
• The Council Plan 2022 to 2027 and Community Plan 2022 to 2032 have clearly defined economic, social, and
environmental outcomes to be delivered during the period.  
• A  Community Wealth Building Strategy setting out the Council’s ambitions in relation to spending, workforce, land and
property, finance and building the generative economy was approved in March 2021. A Community Wealth Building
Commission was  established to oversee the implementation of the Strategy .A Community Wealth Building Progress
Group has been set up to ensure that timescales within the action plan are met.
• Annual Resource Plans which deliver the objectives of the Council Plan were reviewed and updated.  These plans outline
the outcomes and actions to be achieved within the year and reference linkages with other key strategic plans of the
Council and partnership plans.
• The Sustainable Development and Climate Change Strategy 2022-27 was approved by the Council in June 2022 and
which sets out the Council’s strategic vision ,themes and priorities in terms of the Council, environment and communities
for sustainable development and climate change during the period was developed using the principles of the United
Nation’s Sustainable Development Goals and to reduce the council’s contribution to global warming.  
• The Council’s Climate Change and Sustainability Committee oversees the delivery of the Sustainable Development and
Climate Change Strategy 2022-2027, the council’s transition to carbon neutrality and climate resilience.     
82

Page 83

23
• The Council’s new Procurement Strategy 2023-28 which will be complemented by an annual action plan, sets out how
value for money, national and local priorities will be delivered.  It also demonstrates how the council will deliver the wider
social, economic, and environmental aims of procurement as required by the sustainable procurement duty.  
• Sustainability principles are embedded in procurement processes and in recognition of the importance of our suppliers in
achieving the Council’s aim to become more sustainable.  
• Strategic Environmental Assessments (SEAs) were completed for all relevant council led policies, plans and strategies
developed during 2022/2023.
• The South Lanarkshire Local Development Plan 2 was adopted by the Council on 9 April 2021.  The spatial strategy of the
plan is to encourage sustainable economic growth and regeneration, a move towards a low carbon economy, protect the
natural and historic environment and mitigate against the impacts of climate change.
• A summary of the findings resulting from Equality Impact Assessments of the council’s key decisions on service users,
communities and businesses have been published on the Council’s website.  
• Strategic decisions of the Council have been subject to a Fairer Scotland Impact Assessment which considers how
inequalities of outcome can be reduced. 
Principle D: Determining the interventions necessary to optimise the achievement of the intended outcomes 
Links to Council’s values:
Accountable, effective, efficient, and transparent; Ambitious, self-aware, and improving; Focused on people and their needs;
Working with and respecting others
How we do this:
• Key services were adapted, and delivery was maintained throughout the Pandemic in line with Public Health guidance and
Government guidance and legislation.  
• There is a standard approach to identifying savings across the Council.  The Council’s efficiency programme is overseen
by the Senior Management Team.  Frameworks are in place for holding discussions with key stakeholders.  Savings
achievements are monitored monthly and reported to the Senior Management Team quarterly.   
• The Financial Strategy which is aligned with the Council’s objectives was updated during the year to reflect the latest
internal and external influences.  This plan sets out the assumptions in terms of commitments, grant funding and efficiency
requirement and demonstrates sound financial management and the ability to address projected funding gaps.
• The annual budget setting consultations took place with members of the public, groups and the Council’s partners in order
to inform the budget process. The annual budget is open to scrutiny and amendment by councillors until the approval of
the final budget.  
• The Council’s Performance Management Framework has ensured that progress against intended outcomes has been
regularly reported to Management Teams; Committees; and the Performance and Review Scrutiny Forum.  Decisions and
actions to address performance issues have been taken and monitored to ensure that they have been effective. 
• The Council has complied with its statutory and regulatory reporting requirements during the year.  
• The Public Bodies (Joint Working Act) sets out those Adult Care Services that are delegated to the Integration Joint Board
(IJB) as set out in the South Lanarkshire Integration Scheme.  These services continue to be operationally delivered by
the council in line with the strategic direction set out in the Strategic Commissioning Plan and annual IJB Directions.
• The Council considers the specification and achievement of community benefits, which focus on the health, economic,
social, and environmental wellbeing of the South Lanarkshire area, when awarding contracts.
• To improve efficiency and effectiveness, the Council is the lead authority for a range of collaborative projects and services
delivered through the Clyde Valley Learning and Development Group. 
Principle E: Developing the entity’s capacity, including the capability of its leadership and the individuals within it
Links to Council’s values:
Accountable, effective, efficient, and transparent; Ambitious, self-aware, and improving; Excellent employer; Focused on
people and their needs; Working with and respecting others
How we do this:
• A Leadership Challenge Programme which is linked to succession planning has been developed and rolled out during
2022-23.
• Learning and Development programmes were revised and employees at all levels can now access optional accredited
management qualifications.
• Training requirements were identified and online learning and development opportunities including webinars and e-
briefings were developed and offered to all councillors.  
•  Feedback from the survey  on working from home/hybrid working, will be used to inform future agile working arrangements.
• A range of policies and activities are in place to support the Health and Wellbeing of employees including physical and
mental health and these have been regularly communicated.  Online wellbeing events were held in response to the new
ways of working.
• The Council recognises that skilled and motivated employees are a key asset.  All employees have an annual performance
appraisal which links to the Council values and a Personal Development Plan.  The council offers a range of training
interventions to support employee development. 
• The Council has a comprehensive and coordinated approach to workforce planning which also supports succession
planning.  Each Resource reviews their workforce plan and related action plan to better understand workforce capacity
issues, further challenges, and opportunities to ensure that resources are in the right place, at the right time and people
have the right skills.  The Council-wide Workforce plan has been revised to consider the workforce requirements as a result
of the pandemic response.   
• Senior Managers have overseen the annual scrutiny of the Council’s assets through the review of a suite of Asset
Management Plans.  Service Asset Management Plans have been developed in line with CIPFA guidance and these feed
into the Corporate Asset Management Plan which outlines priorities and provides an overview of how the Council has
performed in this area.  
83

Page 84

24
• The Council’s Scheme of Delegation, Financial Regulations, Standing Orders on Contracts and Terms of Reference
ensured that Committees, officers, and statutory officers were clear on the decisions that could be made within their area
of authority.  This is supplemented by councillor’s role profiles which outline the key purpose, specific and core
accountabilities for each role.  
• The Council continues to work with a range of public sector, business, and academic partners to improve outcomes for
those living and working in South Lanarkshire.  Strategic Partnerships include the Community Planning Partnership and
the Glasgow City Region City Deal.  
• Local Government Benchmarking Framework(LGBF) results continue to be reported to the Performance Review and
Scrutiny Forum, containing all LGBF indicators. As other reporting arrangements mature, the scale of this report may be
reduced and the strategic suite of indicators aligned to Council Plan outcomes will feature in a new appendix to the Council
Plan Q4 report, giving an opportunity to assess the Council’s performance over time and comparative performance in the
context of the Council Plan priorities. 
• Further LGBF indicators will feature in the Council’s public performance reporting, both in the Annual Performance
Spotlights and in the PPR pages on the website. These are topic-based and place the LGBF information in a richer context
than is possible in the annual LGBF report.  The results are analysed and an action plan developed which will be monitored
by the Senior Management Team.
• The Council takes a risk-based approach to self-assessment which is used to review and redesign services with a focus
on fundamental change.  Progress and the impact of improvement activity was reported to the Senior Management Team
and the Performance and Review Scrutiny Forum.  
• The Council has a robust complaints process which is underpinned by national complaints handling standards.  Complaints
performance was regularly reported to Senior Management and Committee and learning from complaints which is integral
to this process is also published on the Council’s website.  Complaint handling procedures have been updated in line with
national changes and communicated to all employees. 
Principle F: Managing risks and performance through robust internal control and strong public financial management
Links to Council’s values:
Accountable, effective, efficient, and transparent; Ambitious, self-aware, and improving 
How we do this:
• The Council, in partnership with Trade Unions, ensured that safe systems of work were in place through a robust risk
assessment process, changes to working methods and supply of personal protective equipment.  
• The Council has put in place comprehensive arrangements for identifying, evaluating, and controlling significant risks which
threaten the council’s ability to meet its objectives to deliver services to the public.  There is also a robust process in place
for compliance monitoring of the Council’s Risk Management Strategy, Resource Risk Registers and Control Plans.  
• The annual end of year compliance statement evidenced that all Resources were compliant with Risk Management
Strategic requirements.
• The Council’s risk scoring matrix was revised as an outcome of the 2021/2022 annual review of risks.
• The Council’s Internal Audit Service which complies with Public Sector Internal Audit Standards completed a revised annual
programme of risk-based audits with an objective of providing an opinion on the adequacy and effectiveness of the
Council’s risk management, governance, and internal control arrangements.  Where improvements were required, action
plans were developed and monitored and where necessary follow-up audit work completed.
• In response to changes in working practices and the introduction of new systems, for example to process pandemic grants,
Internal Audit has advised on key internal controls that should be maintained through the identification of alternative controls
and has been involved in the development of new systems.
• The Information Governance Board is satisfied that Resources have followed the Information Governance operational
arrangements to promote effective arrangements for the safe collection, storage, use and sharing of data, including
processes to safeguard personal data. 
• Information security incidents have continued to be monitored and considered for notification to the Information
Commissioner’s Office.  Throughout the period, the Council’s Data Protection Officer provided advice and assistance to
Resources in relation to meeting their obligations under UK General Data Protection Regulations (GDPR).
• The system of internal financial control is based upon the Financial Regulations which set out the rules to ensure robust
internal control over the council’s finances.  Control is maintained through regular management information, management
supervision and a structure of delegation and accountability.  
• The cost of the pandemic on the council’s budgets has been closely monitored and regular reports have been presented
to the Senior Management Team and Committee.   
• External Audit of the Council’s accounts is robust and a “clean audit certificate” was issued for 2021/2022.  
• Through a well-established Performance Management Framework, the council has clearly defined processes in place for
the identification, monitoring, and reporting of its objectives to ensure continued effectiveness and the achievement of Best
Value.  Progress is monitored and reported regularly to both managers and councillors.  This includes areas of under-
performance and the related improvement actions.  
• Trustees of the South Lanarkshire Charitable and Educational Trusts received independent legal training setting out their
duties and responsibilities in ensuring that the trusts operate in a manner designed to benefit communities. 
• The Executive Director of Finance and Corporate Resources is a member of the Council’s Senior Management Team and
as such, is integral in all major decisions taken by the Council, and in material matters which are submitted to councillors
for decision.  This involvement fulfils the expectation of CIPFA in terms of the role of the Chief Financial Officer.
• The Council previously completed a self-assessment using the principles of the CIPFA      Financial Management Code
identifying 3 areas to be progressed.  Since then, the 2020/21 annual budget consultation approach and a standard options
appraisal process continue to be embedded across the Council, while our existing financial management controls and
measures continue to provide comfort on the Council’s financial management and resilience.  This includes the preparation
of a medium term strategy presented to members regularly as part of the annual budget process, providing members with
the information required to assist budget planning.     
Principle G: Fair, Open and Sustainable; Implementing good practices in transparency, reporting, and audit to deliver
effective accountability
84

Page 85

25
Links to Council’s values:
Accountable, effective, efficient, and transparent; Ambitious, self-aware, and improving; Working with and respecting others
How we do this:
• The Good Governance Group has completed the annual review of governance arrangements at resource level and in line
with the CIPFA/SOLACE Delivering Good Governance Framework.  Governance improvement actions have also been
identified and are included in Resource/Service Action Plans.  Progress against actions including those highlighted as
significant governance areas for action will be reported to the Senior Management Team and Committee.   
• In the 2021/2022 annual audit report, the external auditor reported that the council had in place appropriate arrangements
to support good governance and accountability and  they were of the view that governance arrangements remained
effective in 2021/22.
• All Directors completed their annual Statement of Assurance and relevant assurances have been provided.    
• The Council prepares and publishes an Annual Governance Statement which is aligned with national guidance and reflects
on the adequacy and effectiveness of the Council’s governance arrangements.  This is independently considered by
External Audit and published with the Annual Accounts and separately on a dedicated governance web page.
• The annual review of governance arrangements for the Council’s at Arm’s Length External Organisation (ALEO) and key
external service providers has not highlighted any compliance issues.
• The annual review of the Local Code of Corporate Governance was completed, and the revised Code was approved by
Committee and re-published on the Council’s website.  
• all agendas, reports and decisions continue to be published (except those exempt under the Local Government (Scotland)
Act 1973) on the council’s website.   All Committee and Forum meetings are livestreamed to the Council’s YouTube page
http://bit.ly/SL_Committees.
• The Risk and Audit Scrutiny Committee considered the adequacy and effectiveness of the Council’s governance
arrangements and internal control environment and approved the Annual Governance Statement and Accounts.   
• Internal audit activity has continued to be reported to the Senior Management Team and to the Risk and Audit Scrutiny
Committee. 
• Internal Audit changed how their findings are presented to the Risk and Audit Scrutiny Committee to improve scrutiny.
• Outcomes from external audit and inspection activity was reported to the appropriate Committee and action plans were
developed for implementation where required. 
COVID-19 Pandemic Governance Arrangements
The 2019/2020 Governance Statement set out the initial impacts of the Pandemic on the council’s governance arrangements.  During
2020/2021, the council, its partners and local community organisations continued to strengthen the partnership approach in response to
the Pandemic. In 2022/2023 the council continues to manage any remaining impacts of the Pandemic through robust resilience
arrangements and controls. 
As the council  moved through the different phases of response and recovery, changes to governance arrangements were made to comply
with national guidance and legislation.  In some cases new ways of working put in place to continue to maintain the delivery of essential
business of the council during the Pandemic have been embedded and continued.  Priority services were maintained throughout the
Pandemic and many new services/processes established.  Schools, nurseries, etc.  adapted in accordance with national decisions and
guidance.      
Costs associated with the Pandemic were met from funding provided by the Scottish Government and the council  continued to monitor
the financial impact of the Pandemic into 2022/2023 and beyond.  This  included working with South Lanarkshire Leisure and Culture on
the impact of the Pandemic on their business and their recovery. 
The council and the Community Planning Partnership  reviewed their priorities which were informed by ongoing dialogue with local
communities, organisations, and businesses. 
Recovery was  a significant area of work for the council and its partners and was highlighted as such in Section 7 of the 2021-2022 Annual
Governance  Statement. 
CIPFA Financial Management Code
The Financial Management Code (FM Code) provides guidance for good and sustainable financial management in local authorities.  By
complying with the principles and standards within the code authorities will be able to demonstrate their financial sustainability.  The
following information sets out the council’s level of compliance with the CODE.
The council has reviewed the principles of the FM Code as part of its internal governance process.  The Council previously completed a
self-assessment using the principles of the CIPFA Financial Management Code identifying 3 areas to be progressed.  Since then, the
2020/21 annual budget consultation approach and a standard options appraisal process continue to be embedded across the Council,
while our existing financial management controls and measures continue to provide comfort on the Council’s financial management and
resilience.  This includes the preparation of a medium-term strategy presented to members regularly as part of the annual budget
process, providing members with the information required to assist budget planning. 
6. Review of Effectiveness 
The review of governance arrangements for 2022/2023 has also considered the following assurance outcomes: - 
85

Page 86

26
Group Assurances 
In respect of the Joint Boards, Charities and Companies that fall within the council’s group boundary, the review of their internal financial
control systems is informed by: - 
• Annual Governance Statements included in the respective financial statements of the Joint Boards.
• Assurances from company directors and/or other senior company officials; and
• The work of the relevant body’s respective external auditors (and where relevant internal auditors) and other interim reports. 
The Executive Director of Finance and Corporate Resources, the council’s Chief Financial Officer, has considered the effectiveness of the
group’s internal financial control system for the year ended 31 March 2023.  It is the Executive Director of Finance and Corporate
Resources’ opinion that reasonable assurance can be placed on its effectiveness. 
Internal Assurance 
It is the opinion of the council’s Risk Management Service that a reasonable level of assurance can be placed on the council’s strategic
risk control environment and a reasonable level of assurance can be placed on the council’s operational risk control environment. 
It is the opinion of the council’s Audit and Compliance Manager that, overall, reasonable assurance can be placed on the adequacy and
effectiveness of the council’s framework of governance, risk management and control arrangements for the year ending 31 March 2023. 
7. Significant Governance Areas 
The 2021/2022 Annual Governance Statement identified 11 significant governance areas that the council were working to address. 
Progress updates can be found on the council’s website; see the Significant Governance Areas Update Q4 2021/2022. Six of these areas
remain as significant areas of action for the council moving forward into 2022/2023 and will continue to be monitored as such.   
Through the 2022/2023 annual governance review, the following areas which outline the actions being taken to address them have been
identified as significant areas of work for the council during 2022/2023:- 
No. Areas identified in 
2022/2023
Actions  Lead Officer
1 Cyber Resilience 
Compliance with legislative and
regulatory policy 
A programme of actions to maintain cyber security and
resilience in 2023/2024 will include:
• Refresh/retiral of legacy systems, network
equipment and end user devices (mobile
phones, PCs)
• Programme of security patching of all systems
• Compliance with PSN and Cyber Essentials
schemes
• Incident response 
• Officer training and awareness (e.g., phishing)
• Data security reviews as part of new system
installation and security monitoring 
Executive Director
of Finance and
Corporate
Resources
2  Financial Challenges
Exceptional increase in costs,
reduction in council funding,
resulting in difficulties
maintaining front line services
The Council faces a challenging situation in the
medium to long-term because of reduced funding in
real terms, rising costs and an increase in demand.   In
addition there are exceptional increases in costs being
experienced resulting in significant budget gaps that
will require to be managed.
The Council has developed a long-term strategy which
identifies budget pressures, future risks and
uncertainties, and projects budget gaps to 2028/2029. 
The Budget Strategy for 2024/2025 will be updated and
presented to councillors tin 2023.
Chief Executive
Director of
Finance and
Corporate
Resources
3 Integrated Joint Board –
Health and Social Care
The need for the Council to
deliver the objectives set out in
the Integrated Joint Board (IJB)
Strategic Commissioning Plan
2022-25 
The current strategic direction set out and approved by
the IJB is detailed within the Strategic Commissioning
Plan.  The council and NHS Board are required to
deploy their resources in line with this strategic
direction. 
The IJB issues Directions that set out the key actions to
be delivered by the council during the year 2023/2024
and these Directions were agreed by the IJB at it
special budget meeting in March 2023.  
The council will provide progress updates against
Directions for which it is the lead organisation.
Director, Health
and Social Care,
South Lanarkshire
Health, and Social
Care Partnership
86

Page 87

27
No. Areas identified in 
2022/2023
Actions  Lead Officer
4 Review of Community
Planning
Provide support to the review of
Community Planning
arrangements 
Complete the review of community Planning which
focussed on several key areas including structures,
governance, and accountability arrangements.  The
council will provide resources to support the completion
of the Review and work with partners to progress
changes,
Director of
Finance and
Corporate
Resources
5 Community Wealth Building 
Deliver the Community Wealth
Building Strategy
The Community Wealth Building Strategy which was
approved in March 2021 will bring fundamental
changes to how the Council delivers its services and
works with its partners and communities. In August
2021 the Community Wealth Building Commission
approved an action plan containing a range of actions
to progress the aspirations of the Strategy   over a 3-to-
5-year timeframe. A risk register has been developed
and approved. Risk monitoring arrangements are in
place
An annual report highlighting progress over the first
year of the Strategy was presented to the Commission
on  28 June 2022 for approval.
A further Annual Report on the year 2 Year 2 Actions
identified in the approved Action Plan will be
progressed in 2023/2024.
Director of
Finance and
Corporate
Resources
6 Sustainable Development and
Climate Change 
A new Strategy for 2022-2027 was developed and
presented to Council in June 2022 for approval
together with the Council Plan and Community Plan. An
Action Plan was developed for the first year of the
Strategy .The Action Plan will be reviewed annually
with progress updates being reported to the Climate
Change and Sustainability Committee on a 6 monthly
basis.
Director of
Community and
Enterprise
Resources
9 Economic Strategy The new draft Economic Strategy 2022-2027 has been
developed and approved by Council on 15th June 2022
as part of a suite of documents accompanying the draft
Council Plan and Community Plan. The vision within
the Strategy is “to make South Lanarkshire a
flourishing, green, dynamic and equitable place for
communities, visitors, businesses and investors”.  The
Strategy is framed around the 3 themes of sustainable,
inclusive, economic development- People, Place and
Business. 
Progress on the delivery of the Action Plan will be
measured 6-monthly with the results being reported
annually to the relevant committees.
The council will continue to lead on local economic
recovery for South Lanarkshire businesses through
promotion of local economic support networks and
contribution to the pan-Lanarkshire Economic Forum.
Director of
Community and
Enterprise
Resources
10 South Lanarkshire Leisure and
Culture
• Develop the Commissioning Plan between the
Council and SLLC
• Support the Strategic Asset Review of SLLC
occupied properties 
Director of
Community and
Enterprise
Resources
11 Recruitment and Retention
Challenges 
The labour market has tightened and employees have
more mobility through agile working which is not
necessarily tied to a geographical location.  In addition
some older workers have reassessed priorities and
taken up an option for partial or full retiral earlier than
they would have done previously.
As a result there are a number of skills in short supply
nationally and this is putting pressure on local
government services.  Examples of this include HGV
drivers, procurement and Social Care.  The impact on
Chief Executive
and all Directors 
87

Page 88

28
No. Areas identified in 
2022/2023
Actions  Lead Officer
Senior Manager recruitment and retention is also clear
and turnover at this level is closely monitored
South Lanarkshire Council has experienced these
issues and is taking the following actions:-
• Workforce Plans were refreshed to reflect the
changed environment by 30 June 2022. The
updated plans were reported to the relevant
Resource Committees in September and Oc-
tober 2022.
• A grow your own approach is being used in
key areas (recruited graduates in Procure-
ment)
• Increasing social media recruitment and use
of job fairs
• Employability routes are being defined for
skills shortage areas (e.g. Social care)
• Enhanced employee support arrangements
are in place but also being reviewed for devel-
opment 
8. Summary
The annual review of governance arrangements across the council and overall compliance with the council’s Code demonstrate sufficient
evidence that the Code’s principles of Delivering Good Governance in Local Government operated effectively, and that the council complies
with its Code.  
During 2023/2024, steps will be taken to address the significant governance areas highlighted in this statement to further strengthen the
council’s governance arrangements and evidence our commitment to continuous improvement.   
Joe Fagan
Leader of the Council 
Signature:        Date: 
Cleland Sneddon
Chief Executive 
Signature:        Date: 
88

Page 89

29 
Statement of Responsibilities 
The council is required to:
▪ Make arrangements for the proper administration of its
financial affairs and to secure that the proper officer
has responsibility for the administration of those affairs
(section 95 of the Local Government (Scotland) Act
1973). South Lanarkshire Council has designated the
Executive director of Finance and Corporate
Resources as the officer with these responsibilities. 
▪ Manage its affairs to secure economic, efficient and
effective use of resources and safeguard its assets. 
▪ Ensure the Annual Accounts are prepared in
accordance with legislation (The Local Authority
Accounts (Scotland) Regulations 20174), and so far as
is compatible with that legislation, in accordance with
proper accounting practices (section 12 of the Local
Government in Scotland Act 2003). 
▪ Approve the Annual Accounts for signature. 
Councillor Joe Fagan
Leader of the Council 
Executive Director of Finance and Corporate
Resources’ responsibilities 
The Executive Director of Finance and Corporate Resources is
responsible for the preparation of the council’s Annual Accounts
in accordance with proper practices as required by legislation
and as set out in the CIPFA/LASAAC Code of Practice on Local
Authority Accounting in the United Kingdom (the Accounting
Code).
In preparing the Annual Accounts, the Executive Director of
Finance and Corporate Resources has:
▪ selected suitable accounting policies and then applied
them consistently. 
▪ made judgements and estimates that were reasonable
and prudent. 
▪ complied with legislation. 
▪ complied with the local authority Accounting Code (in so
far as it is compatible with legislation) 
The Executive Director of Finance and Corporate Resources
has also:
▪ kept proper accounting records which were up- to-date. 
▪ taken reasonable steps for the prevention and detection of
fraud and other irregularities. 
Annual Accounts
I certify that the financial statements give a true and fair view of
the financial position of the council (and its group) at the
reporting date and the transactions of the council (and its
group) for the year ended 31 March 2023. 
Paul Manning
Executive Director
(Finance and Corporate Resources) 
South Lanarkshire Council
Date: 27 June 2023 
89

Page 90

30
Remuneration Report
Remuneration Policy 
Senior Employees
The salary of senior employees is set by reference to national arrangements. The Scottish Joint Negotiating Committee (SJNC) for Local Authority Services sets the salaries for the Chief Officers of
Scottish local authorities. Circular CO/150 sets the amount of salary for Chief Officers and the Chief Executive of South Lanarkshire Council for 2022/2023. 
Senior Councillors
The remuneration of councillors is regulated by the Local Governance (Scotland) Act 2004 (Remuneration) Regulations 2007 (SSI No. 2007/183) as amended most recently by the Local Governance
(Scotland) Act 2004 (Remuneration) Amendment Regulations 2022 (SSI 2022/18). The Regulations provide for the grading of councillors for the purposes of remuneration arrangements, as either the
Leader of the Council, the Civic Head (or Provost), Senior Councillors or Councillors. The Leader of the Council and the Civic head (or Provost) cannot be the same person for the purposes of payment
of remuneration. A Senior Councillor is a Councillor who holds a significant position of responsibility in the Council’s political management structure. 
The salary that is to be paid to the Leader of the Council is set out in the Regulations. For 2022/2023 the salary for the Leader of the Council is £45,669.  The Regulations permit the Council to
remunerate one Civic Head or Provost. The regulations set out the maximum salary that may be paid to that Civic Head.  The Council follows the regulations and pays a salary of £34,254 to the
Provost. 
The Regulations also set out the remuneration that may be paid to Senior Councillors and the total number of Senior Councillors the Council may have. The maximum yearly amount that may be paid to
a Senior Councillor is 75 per cent of the total yearly amount payable to the Leader of the Council. The total yearly amount payable by the Council for remuneration of all of its Senior Councillors shall not
exceed £511,316 (excluding the Leader and Provost). The Council is able to exercise local flexibility in the determination of the precise number of Senior Councillors up to a maximum of 19 and their
salary within these maximum limits. 
In 2022/2023, the Council had 19 Senior Councillors and the salary paid to these councillors totalled £489,408. The Regulations also permit the Council to pay contributions or other payments as
required to the Local Government Pension Scheme in respect of those Councillors who elect to become Councillor members of the pension scheme. 
In addition to the Senior Councillors of the Council the Regulations also set out the remuneration payable to Councillors with the responsibility of a Convenor or a Vice-Convenor of a Joint Board. The
Regulations require the remuneration to be paid by the Council of which the Convenor or Vice-Convenor is a member. The Council is also required to pay any pension contributions arising from the
Convenor or Vice-Convenor being a member of the Local Government Pension Scheme. The Council is reimbursed by the Joint Board for any additional remuneration paid to the member from being a
Convenor or Vice-Convenor of a Joint Board. 
Audit Arrangements
All information disclosed in the tables numbered 1 to 8 in this Remuneration Report will be audited by the Council’s auditors, Audit Scotland. The other sections of the Remuneration Report will be reviewed
by Audit Scotland to ensure that they are consistent with the financial statements. 
Note 14 to the Accounts contains total payments made to all Councillors and will be audited as part of the audit of the Financial Statements and supplementary Notes to the Accounts. 
90

Page 91

31 
Table 1 – General Pay Band Disclosure for Senior Employees 
Annual Remuneration 
2022/23
Number of
Employees
2021/22
Number of
Employees
50,000 - 54,999 365 364
55,000 - 59,999 254 189
60,000 - 64,999 152 136
65,000 - 69,000 99 52
70,000 - 74,999 23 23
75,000 - 79,999 20 6
80,000 - 84,999 4 1
85,000 - 89,999 3 4
90,000 - 94,999 4 6
95,000 - 99,999 6 11
100,000 - 104,999 13 5
105,000 - 109,999 1 3
110,000 - 114,999 2 1
115,000 - 139,999 (Note 1) - -
140,000 - 144,999 1 2
145,000 - 149,999 2 1
150,000 - 154,999 - -
155,000 - 159,999 1 -
160,000 - 179,999 (Note 1) - -
180,000 - 184,999 - 1
185,000 - 189,999 1 - 
Note 1: These are merged pay bands covering more than £5,000 due to the fact that no employees fell into these bands in either financial year.   
91

Page 92

32 
Disclosure of Exit Packages 
The number of exit packages with total cost per band and total cost of the compulsory and other redundancies are set out in the table below.
Table 2 – Exit Packages 
Exit package cost
band (including
special payments)
£ Number of
Compulsory
Redundancies
2022/23 
Number of
Compulsory
Redundancies
2021/22 
Number of
Other
Departures
Agreed
2022/23 
Number of
Other
Departures
Agreed
2021/22
Total
Number
of Exit
Packages
by cost
Band
2022/23
Total
Number
of Exit
Packages
by cost
Band
2021/22 
Cash 
Value 
£
2022/23 
Notional 
CAY
Value
£
2022/23
Total Cost
Of Exit 
Packages 
In Each
Band
£
2022/23 
Cash 
Value 
£
2021/22 
Notional 
CAY
Value
£
2021/22
Total Cost
Of Exit 
Packages 
In Each
Band
£
2021/22             
0 - 20,000 - - - - - - - - - - - -
20,001 - 40,000 - - - - - - - - - - - -
40,001 - 60,000 - - - - - - - - - - - -
60,001 - 80,000 - - - - - - - - - - - -
80,001 - 100,000 - - - - - - - - - - - -
100,001 - 150,000 - - - - - - - - - - - -
>150,000 - - - - - - - - - - - -
Total - - - - - - - - - - - -
Provision - - - - - - - - - - - -
Total incl
Provisions
- - - - - - - - - - - - 
There were no exit packages agreed by the Council in 2022/2023, therefore the total cost of exit packages shown for 2022/2023 totals is nil.  
The table does not include any provisions as there are no known exit packages that relate to employees who will leave the Council in the coming year (2023/2024).  
92

Page 93

33
Disclosure of Remuneration 
The tables below provide details of the remuneration paid to the Council’s Senior Employees and Senior Councillors and to the Chief Executive or most senior manager of subsidiary bodies (South
Lanarkshire Leisure and Culture Ltd and Routes to Work South).  Comparative figures for 2021/2022 have been shown if they were in post at that time.  We have also disclosed the remuneration of
Councillors who hold Convenor and Vice-Convenor roles with Joint Boards. The Council pays the Councillor on behalf of the Joint Board for their role and recovers these charges from the Joint Board.
The annual return of Councillors’ remuneration for 2022/2023 is available on the Council’s website (www.southlanarkshire.gov.uk). 
Table 3 – Senior Officers
Post Salary / fees
£
Taxable
Expenses
£
Compensation for 
Loss of Office
£
Any Other 
Remuneration
£
2022/23
Total
£
2021/22
Total
£
C Sneddon
Chief Executive
187,395  - - - 187,395  184,698 
P Manning
Executive Director of Finance and Corporate Resources 
159,142 - - - 159,142 149,435
D Booth
Executive Director of Community and Enterprise Resources
(From 28 February 2022) 
143,924  - - - 143,924  12,604
(Full Year
Equivalent
137,070)
D Lowe
Executive Director of Housing and Technical Resources
(To 30 September 2022)
74,263
(Full Year
Equivalent
147,959
- - - 74,263
(Full Year
Equivalent
147,959
140,913
A Finnan
Acting Executive Director of Housing and Technical
Resources
(From 3 October 2022 to 20 November 2022 
19,300
(Full Year
Equivalent
143,924)
- - - 19,300
(Full Year
Equivalent
143,924)
n/a
S Gibson
Executive Director of Housing and Technical Resources
(From 21 November 2022) 
52,386
(Full Year
Equivalent
143,924)
- - - 52,386
(Full Year
Equivalent
143,924)
n/a
T McDaid
Executive Director of Education Resources 
147,959 - - - 147,959 140,913
S Sengupta
Executive Director of Health and Social Care (Note 1)
(From 9 August 2021) 
145,948  - - -  145,948  88,754
(Full Year
Equivalent
137,226)
L Purdie
Chief Social Work Officer 
111,118 - - - 111,118 106,448
2021/22 senior officers where post holders are no longer in
post
- - - - - 156,102
Total 1,041,435 - -  1,041,435 979,867 
93

Page 94

34
The senior employees included in the table include any local authority employee: 
• Who has responsibility for management of the local authority to the extent that the person has power to direct or control the major activities of the authority (including activities involving the
expenditure of money), during the year to which the Report relates, whether solely or collectively with other persons. 
• Who holds a post that is politically restricted by reason of section 2(1) (a), (b) or (c) of the Local Government and Housing Act 1989; or 
• Whose annual remuneration, including any remuneration from a local authority subsidiary body, is £150,000 or more. 
The total remuneration includes Returning Officer (RO) fees.  An RO is the person responsible for administering a local government election. These duties are separate from any duties undertaken as a
local government employee. The total RO fee for a local government election is based upon the number of Wards in respect of whose election an RO is responsible and the rate is agreed by COSLA
and the arrangements set out in the COSLA Circular CO/145 of July 2008.  The RO can appoint one or more persons to discharge any or all of the functions of the post but cannot delegate personal
responsibility for delivering the election. Cleland Sneddon is the RO appointed by South Lanarkshire Council during the financial year 2022/2023 carried out his duties as RO for the May 2022 Local
Government Elections.
Note 1 While the Executive Director of Health and Social Care is contractually employed by the Council, a proportion of their total remuneration is funded by the South Lanarkshire Health and Social
Care Partnership in respect of their role as Chief Officer of the Partnership. 
Table 4 - Senior Employees of the Council’s Subsidiary Bodies 
Name and Post Salary/fees Taxable
Expenses
£
Compensation for
Loss of office
£
Any other
Remuneration
£
2022/23
Total
£
2021/22
Total
£
K Morrison
Secretary of South Lanarkshire Leisure and Culture Ltd
(From 28 February 2022 to 20 March 2022) 
General Manager of South Lanarkshire Leisure and Culture Ltd
(From 21 March 2022) 
100,844  -  -  -  100,844  6,731
(Full Year
Equivalent
96,155) 
S Barr
Chief Executive of Routes to Work South  77,705  -  -  -  77,705  70,743
2021/22 senior employees where post holders are no longer in post  - - - - - 90,731
Total 178,549 - - - 178,549 168,205 
94

Page 95

35 
Table 5 - Remuneration of Senior Councillors and Convenors and Vice-Convenors of Joint Boards 
The table below shows the full year remuneration for all senior councillors in 2022/2023.  This includes senior councillors who started or ended their role during the year.
Name and Post Salary 
£
Taxable
Expenses
£
Compensation for 
Loss of Office
£
Any Other 
Remuneration
£
2022/23
Total
£
2021/22
Total
£
A Allison
Opposition Leader – Conservative
(From 1 April 2022 to 5 May 2022) 
Opposition Leader – Second Opposition
(From 18 May 2022 to 31 March 2023) 
2,484
(Full Year
Equivalent
25,903) 
22,568
(Full Year
Equivalent
25,903) 
- - - 2,484
(Full Year
Equivalent
25,903) 
21,503
(Full Year
Equivalent
25,903) 
24,623 
J Anderson
Community and Enterprise Resources Committee Chair
(From 1 April 2022 to 5 May 2022) 
2,848
(Full Year
Equivalent
29,705) 
- - - 2,848
(Full Year
Equivalent
29,705) 
28,237
J Bradley
Social Work Resources Committee Chair
(From 1 April 2022 to 5 May 2022) 
2,848
(Full Year
Equivalent
29,705) 
- - - 2,848
(Full Year
Equivalent
29,705) 
28,237
R Brown
Community and Enterprise Resources Committee Chair
(From 18 May 2022 to 31 March 2023) 
25,092
(Full Year
Equivalent
28,800) 
- - - 25,092
(Full Year
Equivalent
28,800) 
n/a
A Buchanan
East Kilbride Area Committee Chair
(From 1 April 2022 to 5 May 2022) 
East Kilbride Area Committee Chair
(From 18 May 2022 to 31 March 2023)
2,241
(Full Year
Equivalent
23,370) 
20,361
(Full Year
Equivalent
23,370)
-
-
-
-
-
-
2,241
(Full Year
Equivalent
23,370) 
20,362
(Full Year
Equivalent
23,370)
22,215
95

Page 96

36
Name and Post Salary 
£
Taxable
Expenses
£
Compensation for 
Loss of Office
£
Any Other 
Remuneration
£
2022/23
Total
£
2021/22
Total
£
A Carmichael
Licensing Committee Chair
(From 18 May 2022 to 31 March 2023) 
20,361
(Full Year
Equivalent
23,370) 
- - - 20,361
(Full Year
Equivalent
23,370) 
n/a
M Chalmers
Depute Leader of the Council
(From 1 April 2022 to 5 May 2022) 
Depute Opposition Leader
(From 18 May 2022 to 31 March 2023)
2,848
(Full Year
Equivalent
29,705) 
22,568
(Full Year
Equivalent
25,903) 
-
-
-
-
-
-
2,848
(Full Year
Equivalent
29,705) 
22,568
(Full Year
Equivalent
25,903) 
28,237 
G Convery
Depute Opposition Leader – Labour
(From 1 April 2022 to 5 May 2022) 
Depute Leader
(From 18 May 2022 to 31 March 2023) 
2,484
(Full Year
Equivalent
25,903) 
25,880
(Full Year
Equivalent
29,705) 
-
-
-
-
-
-
2,484
(Full Year
Equivalent
25,903) 
25,880
Full Year
Equivalent
29,705) 
24,623 
M Cooper
Provost
(From 18 May 2022 to 31 March 2023) 
29,843
(Full Year
Equivalent
34,254) 
1,952 
-
- 31,795
(Full Year
Equivalent
36,206)
n/a
P Craig
Business Manager Majority Party
(From 1 April 2022 to 5 May 2022) 
2,848
(Full Year
Equivalent
29,705) 
- 
-
- 2,848
(Full Year
Equivalent
29,705) 
28,237 
96

Page 97

37
Name and Post Salary 
£
Taxable
Expenses
£
Compensation for 
Loss of Office
£
Any Other 
Remuneration
£
2022/23
Total
£
2021/22
Total
£
M Devlin
Business Manager – Opposition
(From 1 April 2022 to 5 May 2022) 
Business Manager Ruling Group
(From 18 May 2022 to 31 March 2023) 
2,241
(Full Year
Equivalent
23,370) 
25,880
(Full Year
Equivalent
29,705) 
-
-
-
-
-
-
2,241
(Full Year
Equivalent
23,370) 
25,880
(Full Year
Equivalent
29,705) 
22,215
M Donnelly
Hamilton Area Committee Chair
(From 1 April 2022 to 5 May 2022) 
2,241
(Full Year
Equivalent
23,370) 
- - -  2,241
(Full Year
Equivalent
23,370
22,215
I Dorman
Planning Committee Chair
(From 1 April 2022 to 5 May 2022) 
2,848
(Full Year
Equivalent
29,705) 
- - - 2,848
(Full Year
Equivalent
29,705) 
28,237 
J Fagan
Opposition Leader – Labour
(From 1 April 2022 to 5 May 2022) 
Leader of the Council
(From 18 May 2022 to 31 March 2023) 
2,848
(Full Year
Equivalent
29,705) 
39,788
(Full Year
Equivalent
45,669) 
-
-
-
-
-
-
2,848
(Full Year
Equivalent
29,705) 
39,788
(Full Year
Equivalent
45,669) 
28,237 
A Falconer
Hamilton Area Committee Chair
(From 18 May 2022 to 31 March 2023) 
20,361
(Full Year
Equivalent
23,370) 
- - - 20,361
(Full Year
Equivalent
23,370) 
n/a
L Hamilton
Education Resources Committee Chair
(From 18 May 2022 to 15 January 2023) 
19,174
(Full Year
Equivalent
28,800) 
- - - 19,174
(Full Year
Equivalent
28,800) 
n/a
97

Page 98

38
Name and Post Salary 
£
Taxable
Expenses
£
Compensation for 
Loss of Office
£
Any Other 
Remuneration
£
2022/23
Total
£
2021/22
Total
£
M Horsham
Business Manager Opposition
(From 18 May 2022 to 31 March 2023) 
20,361
(Full Year
Equivalent
23,370) 
- - - 20,361
(Full Year
Equivalent
23,370) 
n/a
G Keatt
Education Resources Committee Chair
(From 16 January 2023 to 31 March 2023) 
5,918
(Full Year
Equivalent
28,800) 
- - - 5,918
(Full Year
Equivalent
28,800) 
n/a
R Lockhart
Clydesdale Area Committee Chair
(From 1 April 2022 to 5 May 2022) 
2,241
(Full Year
Equivalent
23,370) 
- - -  2,241
(Full Year
Equivalent
23,370) 
22,215
K Loudon
Education Resources Committee Chair
(From 1 April 2022 to 5 May 2022) 
2,848
(Full Year
Equivalent
29,705) 
- - - 2,848
(Full Year
Equivalent
29,705) 
28,237 
I McAllan
Provost
(From 1 April 2022 to 5 May 2022) 
3,285
(Full Year
Equivalent
34,254) 
- - - 3,285
(Full Year
Equivalent
34,254) 
32,560 
C McClymont
Clydesdale Area Committee Chair
(From 18 May 2022 to 31 March 2023) 
20,361
(Full Year
Equivalent
23,370)
- - - 20,361
(Full Year
Equivalent
23,370)
n/a
L McDonald
Finance and Corporate Resources Committee Chair
(From 18 May 2022 to 31 March 2023) 
25,092
(Full Year
Equivalent
28,800) 
- - - 25,092
(Full Year
Equivalent
28,800) 
n/a
M McGeever
Climate Change Committee Chair
(From 18 May 2022 to 31 March 2023) 
25,092
(Full Year
Equivalent
28,800) 
- - - 25,092
(Full Year
Equivalent
28,800) 
n/a
D McLachlan
Housing and Technical Resources Committee Chair
(From 18 May 2022 to 31 March 2023) 
25,092
(Full Year
Equivalent
28,800) 
- - - 25,092
(Full Year
Equivalent
28,800) 
n/a
98

Page 99

39
Name and Post Salary 
£
Taxable
Expenses
£
Compensation for 
Loss of Office
£
Any Other 
Remuneration
£
2022/23
Total
£
2021/22
Total
£
G Ferguson-Miller
Finance and Corporate Resources Committee Chair
(From 1 April 2022 to 5 May 2022) 
2,848
(Full Year
Equivalent
29,705) 
- - 
-
2,848
(Full Year
Equivalent
29,705) 
28,237 
R Nelson
Planning Committee Chair
(From 18 May 2022 to 31 March 2023) 
25,092
(Full Year
Equivalent
28,800) 
- - - 25,092
(Full Year
Equivalent
28,800) 
-
C Nugent
Cambuslang and Rutherglen Area Committee Chair
(From 1 April 2022 to 5 May 2022) 
Cambuslang and Rutherglen Area Committee Chair
(From 18 May 2022 to 31 March 2023) 
2,241
(Full Year
Equivalent
23,370) 
20,361
(Full Year
Equivalent
23,370) 
-
-
-
-
-
-
2,241
(Full Year
Equivalent
23,370) 
20,361
(Full Year
Equivalent
23,370) 
22,215
J Ross
Leader of the Council
(From 1 April 2022 to 5 May 2022) 
Opposition Leader – First Opposition
(From 18 May 2022 to 31 March 2023) 
4,379
(Full Year
Equivalent
45,669) 
25,880
(Full Year
Equivalent
29,705)
- - - 4,379
(Full Year
Equivalent
45,669) 
25,880
(Full Year
Equivalent
29,705)
43,412 
D Shearer
Licensing Committee Chair
(From 1 April 2022 to 5 May 2022) 
2,241
(Full Year
Equivalent
23,370) 
- - -  2,241
(Full Year
Equivalent
23,370) 
22,215
B Thomson
Depute Provost
(From 18 May 2022 to 31 March 2023)
24,776
(Full Year
Equivalent
28,438) 
140.00 - - 24,916
(Full Year
Equivalent
28,578
-
99

Page 100

40
Name and Post Salary 
£
Taxable
Expenses
£
Compensation for 
Loss of Office
£
Any Other 
Remuneration
£
2022/23
Total
£
2021/22
Total
£
M Walker
Social Work Resources Committee Chair
(From 18 May 2022 to 31 March 2023)
25,092
(Full Year
Equivalent
28,800) 
- - - 25,092
(Full Year
Equivalent
28,800) 
-
J Wilson
Housing and Technical Resources Committee Chair
(From 1 April 2022 to 5 May 2022) 
2,848
(Full Year
Equivalent
29,705) 
- - - 2,848
(Full Year
Equivalent
29,705) 
28,237 
2021/22 senior councillors where post holders are no longer in post  - - - - - 6,666
Total 566,703 2,092 - - 568,795 519,307
Councillors with Joint Board Responsibilities 
W Brogan
Convenor Lanarkshire Valuation Joint Board
(From 27 June 2022 to 31 March 2023) 
18,635
(Full Year
Equivalent
24,467) 
- - - 18,635
(Full Year
Equivalent
24,467) 
n/a
L Hamilton
Depute Convenor Lanarkshire Valuation Joint Board
(From 1 April 2022 to 5 May 2022) 
2,229
(Full Year
Equivalent
23,244) 
- - - 2,229
(Full Year
Equivalent
23,244) 
21,204
2021/22 councillors with Joint Board responsibilities where post
holders are no longer in post 
- - - - - -
Total 20,864 - - - 20,864 21,204 
The Council is reimbursed by Lanarkshire Valuation Joint Board for the additional remuneration that the Council paid to the member for being a Depute Convenor (equivalent to Vice Convenor) of the
Joint Board. 
The following recharges were made to Joint Boards for South Lanarkshire Council Councillors holding Convenor/Depute Convenor roles:
• Recharge to Lanarkshire Valuation Joint Board in 2022/2023 - £4,081 (2021/2022 - £3,476) 
100

Page 101

41
Pension Rights
Pension benefits for councillors and local government employees are provided through the Local Government Pension Scheme (LGPS). 
Councillors’ pension benefits are based on career average pay. The councillor’s pay for each year or part year ending 31 March (other than the pay in the final year commencing 1 April) is increased by
the increase in the cost of living, as measured by the appropriate index (or indices) between the end of that year and the last day of the month in which their membership of the scheme ends. The total
of the revalued pay is then divided by the period of membership to calculate the career average pay. This is the value used to calculate the pension benefits. 
Local government employees had a final salary pension scheme prior to 1 April 2015. This means that pension benefits are based on the final year’s pay and the number of years that person has been
a member of the scheme.  As of 1 April 2015, local government employees are now part of a defined benefit pension scheme worked out on a career average basis.  Benefits built up are calculated
using pensionable pay each scheme year, rather than final salary.  All benefits built up prior to this date are protected. 
From 1 April 2009, a five-tier contribution system was introduced with contributions from scheme members based on how much pay falls into each tier. This is designed to give more equality between
the costs and benefits of scheme membership. Under The Local Government Pension Scheme (Scotland) Regulations 2014, the earnings ranges used to determine annual contribution rates are to be
increased each year by any increase applied to pensions under the Pensions (Increase) Act 1971. In accordance with this the salary bands for 2021/2022 were uprated by the Consumer Prices Index
(CPI) increase for 2022/2023. 
The member contribution rates and tiers for 2022/2023 are shown below along with those that applied in 2021/2022:
Pensionable Pay Contribution rate
2022/23 
Pensionable Pay Contribution rate
2021/22 
On earnings up to an including £23,000 5.50% On earnings up to an including £22,300 5.50%
On earnings above £23,000 and up to £28,100 7.25% On earnings above £22,300 and up to £27,300 7.25%
On earnings above £28,100 and up to £38,600 8.50% On earnings above £27,300 and up to £37,400 8.50%
On earnings above £38,600 and up to £51,400 9.50% On earnings above £37,400 and up to £49,900 9.50%
On earnings above £51,400 12.00% On earnings above £49,900 12.00% 
From April 2015, if a person works part-time their contribution is based on their part-time pay.  Prior to this, if a person worked part-time, their contribution rate was worked out on the whole-time pay
rate for the job, with actual contributions paid on actual pay earned.   
There is no automatic entitlement to a lump sum.  Members may opt to give up (commute) pension for lump sum up to the limit set by the Finance Act 2004. 
From 1 April 2015, benefits are calculated on the basis of a revalued annual pension built up of 1/49th of pensionable pay each year, plus inflation to keep up with the cost of living.  Prior to this date, the
accrual rate guaranteed a pension based on 1/60th of final pensionable salary and years of pensionable service and prior to 2009 the accrual rate guaranteed a pension based on 1/80th and a lump sum
based on 3/80th of final pensionable salary and years of pensionable service. 
The value of the benefits has been calculated without exercising any option to commute pension entitlement into a lump sum and without any adjustment for the effects of future inflation. 
In those cases where members have transferred pension entitlements from previous employments, the pension figures shown relate to the benefits that the person has accrued as a consequence of
their total local government service, and not just their current appointment. It also reflects both employer and employee contributions. 
101

Page 102

42
Table 6 – Pension Benefits: Senior Employees
The Pension entitlement of Senior Employees for the year to 31 March 2023 are shown in the table below, together with the contribution made by the council to each senior employees’ pension during
the year. The accrued pension benefit reflects both the employer and the employee contributions.
Name and Post Title  
Accrued Pension
Benefits to
31 March 2023 
£000
Movement in 
Accrued pension
Benefits since
31 March 2022 
£000 
Pension Contribution
Made by the Council
2022/23 
£
Pension Contribution
Made by the Council
2021/22 
£
C Sneddon
Chief Executive 
Pension
Lump Sum
87
126
10
4
34,555 32,910
P Manning
Executive Director of Finance and Corporate Resources 
Pension
Lump Sum
72
97
6
5
30,114 28,680
D Booth
Executive Director of Community and Enterprise Resources
(From 28 February 2022)
Pension
Lump Sum
58
91
58
91
27,777 2,432
D Lowe
Executive Director of Housing and Technical Resources
(To 30 September 2022)
Pension
Lump Sum.
71
96
8
7
14,333 27,196
A Finnan
Acting Executive Director of Housing and Technical Resources
(From 3 October 2022 to 20 November 2022
Pension
Lump Sum. 
56
88
n/a
n/a
3,725 n/a
S Gibson
Executive Director of Housing and Technical Resources
(From 21 November 2022)
Pension
Lump Sum. 
1
-
n/a
n/a
10,111 n/a
T McDaid
Executive Director 
Pension
Lump Sum
50
71
3
-
28,556 27,196
S Sengupta
Executive Director of Health and Social Care (Note 1)
(From 9 August 2021)
Pension
Lump Sum
5
-
3
-
28,168 17,129
L Purdie
Chief Social Work Officer 
Pension
Lump Sum
54
79
5
4
21,446 20,448
2021/22 senior officers where post holders are no longer in
post 
- - - 29,869
Total    198,785 185,860 
All senior employees shown in the table above are members of the Local Government Pension Scheme (LGPS).  Where employees have joined the council but not transferred previous employment
pension benefits into the Strathclyde Pension Fund the pension figures shown relate only to their current appointment, otherwise the figures shown relate to the benefits that the pension has accrued
as a consequence of their total local government service including payments for election duties.  
102

Page 103

43
Table 7 – Pension Benefits: Senior Employees of the Council’s Subsidiary Bodies
Name and Post Title  
Accrued Pension
Benefits to
31 March 2023 
£000
Movement in 
Accrued pension
Benefits since
31 March 2022 
£000 
Pension Contribution
2022/23 
£
Pension Contribution
2021/22 
£
K Morrison
Secretary of South Lanarkshire Leisure and Culture Ltd
(From 28 February 2022 to 20 March 2022) 
General Manager of South Lanarkshire Leisure and Culture Ltd
(From 21 March 2022)
Pension
Lump Sum
3
-
2
-
19,463 1,299
S Barr
Chief Executive of Routes to Work South 
Pension
Lump Sum
-
-
-
-
6,216 5,659
2021/22 senior employees where post holders are no longer in post  - - - 17,511
Total  25,679 24,469 
Routes to Work South operates a defined contributions scheme for its employees. Accordingly, the only information to be provided in respect of its senior employees is the amount of any pension
contributions made to that scheme by the subsidiary body. 
Table 8 – Pension Benefits: Senior Councillors
The Pension entitlement of Senior Councillors for the year to 31 March 2023 are shown in the table below, together with the contribution made by the council to each Senior Councillors’ pension
during the year. The accrued pension benefit reflects both the employer and the employee contributions.
Name and Post Title  Accrued
Pension
Benefits to
31 March 2023 
£000
Movement in 
Accrued pension
Benefits since
31 March 2022 
£000
Pension
Contribution
Made by the Council
2022/23 
£
Pension Contribution
Made by the Council
2021/22 
£
A Allison
Opposition Leader – Conservative
(From 1 April 2022 to 5 May 2022) 
Opposition Leader – Second Opposition
(From 18 May 2022 to 31 March 2023) 
Pension
Lump Sum
3
-
1
-
4,835 4,752
J Anderson
Community and Enterprise Resources Committee Chair
(From 1 April 2022 to 5 May 2022) 
Pension
Lump Sum
8
2
1
-
550 5,450
103

Page 104

44
Name and Post Title  Accrued
Pension
Benefits to
31 March 2023 
£000
Movement in 
Accrued pension
Benefits since
31 March 2022 
£000
Pension
Contribution
Made by the Council
2022/23 
£
Pension Contribution
Made by the Council
2021/22 
£
J Bradley
Social Work Resources Committee Chair
(From 1 April 2022 to 5 May 2022) 
Pension
Lump Sum
3
-
-
-
550 5,450
R Brown
Community and Enterprise Resources Committee Chair
(From 18 May 2022 to 31 March 2023) 
Pension
Lump Sum
4
-
n/a
n/a
3,335 n/a
A Buchanan
East Kilbride Area Committee Chair
(From 1 April 2022 to 5 May 2022) 
East Kilbride Area Committee Chair
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
7
2
2
1
4,362 4,287
M Chalmers
Depute Leader of the Council
(From 1 April 2022 to 5 May 2022) 
Depute Opposition Leader
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
3
-
-
-
4,905 5,450
G Convery
Depute Opposition Leader – Labour
(From 1 April 2022 to 5 May 2022) 
Depute Leader
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
1
-
n/a
n/a
1,995 n/a
M Cooper
Provost
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
4
-
n/a
n/a
5,760 n/a
P Craig
Business Manager Majority Party
(From 1 April 2022 to 5 May 2022) 
Pension
Lump Sum
7
2
1
-
550 5,450
M Devlin
Business Manager – Opposition
(From 1 April 2022 to 5 May 2022) 
Business Manager Ruling Group
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
5
-
1
-
5,427 5,450 
I Dorman
Planning Committee Chair
(From 1 April 2022 to 5 May 2022)
Pension
Lump Sum
4
-
-
-
550 5,450
104

Page 105

45
Name and Post Title  Accrued
Pension
Benefits to
31 March 2023 
£000
Movement in 
Accrued pension
Benefits since
31 March 2022 
£000
Pension
Contribution
Made by the Council
2022/23 
£
Pension Contribution
Made by the Council
2021/22 
£
J Fagan
Opposition Leader – Labour
(From 1 April 2022 to 5 May 2022) 
Leader of the Council
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
3
-
-
-
8,299 5,450
A Falconer
Hamilton Area Committee Chair
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
4
-
n/a
n/a
3,930 n/a
G Ferguson-Miller
Finance and Corporate Resources Committee Chair
(From 1 April 2022 to 5 May 2022)
Pension
Lump Sum
6
-
1
-
550 5,450
L Hamilton
Education Resources Committee Chair
(From 18 May 2022 to 15 January 2023)
Pension
Lump Sum
5
-
1
-
3,700 n/a
M Horsham
Business Manager Opposition
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
2
-
n/a
n/a
3,930 n/a
G Keatt
Education Resources Committee Chair
(From 16 January 2023 to 31 March 2023)
Pension
Lump Sum
1
-
n/a
n/a
1,142 n/a
K Loudon
Education Resources Committee Chair
(From 1 April 2022 to 5 May 2022)
Pension
Lump Sum
3
-
-
-
550 5,450
I McAllan
Provost
(From 1 April 2022 to 5 May 2022)
Pension
Lump Sum
4
-
1
-
634 6,284
C McClymont
Clydesdale Area Committee Chair
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
4
-
n/a
n/a
3,930 n/a
L McDonald
Finance and Corporate Resources Committee Chair
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
1
-
n/a
n/a
4,843 n/a
M McGeever
Climate Change Committee Chair
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
2
-
n/a
n/a
4,843 n/a
D McLachlan
Housing and Technical Resources Committee Chair
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
7
-
n/a
n/a
4,843 n/a
R Nelson
Planning Committee Chair
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
3
-
n/a
n/a
4,843 n/a
105

Page 106

46
Name and Post Title  Accrued
Pension
Benefits to
31 March 2023 
£000
Movement in 
Accrued pension
Benefits since
31 March 2022 
£000
Pension
Contribution
Made by the Council
2022/23 
£
Pension Contribution
Made by the Council
2021/22 
£
D Shearer
Licensing Committee Chair
Pension
Lump Sum
10
9
2
1
433 5,450
B Thomson
Depute Provost
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
1
-
n/a
n/a
4,782 n/a
M Walker
Social Work Resources Committee Chair
(From 18 May 2022 to 31 March 2023)
Pension
Lump Sum
3
-
n/a
n/a
4,843 n/a
2021/22 senior councillors where post holders are no longer in post or are
no longer a member of a pension fund 
- - - 6,041
Sub Total    88,914 75,864 
Councillors with Joint Board Responsibilities 
W Brogan
Convenor Lanarkshire Valuation Joint Board
(From 27 June 2022 to 31 March 2023) 
Pension
Lump Sum
7
2
n/a
n/a
3,597 n/a
L Hamilton
Depute Convenor Lanarkshire Valuation Joint Board
(From 1 April 2022 to 5 May 2022)
Pension
Lump Sum 
5
-
1
-
430 4,264
Sub Total    4,027 4,264
Overall Total    92,941 80,128 
All Senior Councillors shown in the table above are members of the Local Government Pension Scheme (LGPS).  The pension figures shown relate to the benefits that the pension has accrued as a
consequence of their total local government service and not just their current appointment.
The council is reimbursed by the Joint Board for the additional pension contributions paid by the council for the Depute Convenor (equivalent of Vice-Convenor) of such a Joint Board.
The following recharges were made to Joint Boards for South Lanarkshire Council Councillors holding Depute Convenor roles:
Recharge to Lanarkshire Valuation Joint Board in 2022/2023 - £788 (2021/2022 - £671) 
106

Page 107

47
Trade Union Facility Time
In addition to the regulation governing Senior Employees and Councillors, the Trade Union (Facility Time Publication Requirements) Regulations 2017, which apply from 1 April 2017, require public
sector employers to collect and publish a range of information on trade union facility time in respect of their employees who are Trade Union Representatives.  The figures below cover the period 1 April
2022 to 31 March 2023 and include employees of South Lanarkshire Council, South Lanarkshire Leisure and Culture, SEEMIS and Lanarkshire Valuation Joint Board.
Relevant Trade Union Officials
Number of employees who were relevant union officials during the relevant period  190 
FTE Employee Number  171.51 
Percentage of Time Spent on Facility Time
% Time Number of 
Representatives
0%  51
1% - 50%  132
51% - 99%  3
100%  4 
Percentage of Pay Bill Spent on Facility Time
Total cost of facility time  £570,756
Total pay bill  £630,257,466
Percentage of the total pay bill spent on facility time  0.09% 
Paid Trade Union Activities
Time spent on paid Trade Union activities as a percentage of total paid facility time hours  7.75% 
Councillor Joe Fagan
Leader of the Council       Date: 27 June 2023 
Cleland Sneddon
Chief Executive        Date: 27 June 2023
107

Page 108

48 
Expenditure and Funding Analysis
The objective of the Expenditure and Funding Analysis is to demonstrate to council tax and rent payers how the funding available to the council (i.e. government grants, rents, fees and charges,
council tax and business rates) for the year has been used in providing services in comparison with those resources consumed or earned by the council in accordance with the CIPFA Accounting
Code of Practice. The Expenditure and Funding Analysis also shows how this expenditure is allocated for decision making purposes between the council’s services. Income and expenditure
accounted for under generally accepted accounting practices is presented more fully in the Comprehensive Income and Expenditure Statement on page 49. The segmental analysis in the
Expenditure and Funding Analysis reflects the council's management structure, as reported to the relevant Committees during the financial year. 
2021/22    2022/23 
Net
Expenditure
Chargeable
To the 
General Fund
And HRA
Balance
£000 
(Note 4)
Adjustments
between the
Funding and
Accounting
Basis
£000
Net 
Expenditure 
in the
Comprehensive
Income and
Expenditure
Statement
£000  
Net Expenditure
Chargeable
To the 
General Fund
And HRA
Balance
£000 
(Note 4)
Adjustments
between the
Funding and
Accounting
Basis
£000
Net 
Expenditure 
in the
Comprehensive
Income and
Expenditure
Statement
£000       
122,767 38,336 161,103 Community and Enterprise Resources 127,880 39,543 167,423
370,610 22,002 392,612 Education Resources 409,607 10,262 419,869
39,336 9,486 48,822 Finance and Corporate Resources 48,040 9,151 57,191   
Housing and Technical Resources   
(2,917) 376 (2,541) - Housing Revenue Account 3,990 2,537 6,527
18,682 17,710 36,392 - Housing Other 18,958 14,663 33,621
187,288 23,817 211,105 Social Work Resources 210,458 20,094 230,552
2,313 - 2,313 Joint Board 2,151 - 2,151
3,295 863 4,158 Corporate Items (469) 4,339 3,870
- 116 116 Corporate and Democratic Core (HRA) - 115 115
- - - Non-Distributed Costs – Non-Operational Assets (HRA) - - -
741,374 112,706 854,080 Net Cost of Services 820,615 100,704 921,319
(745,658) (31,093) (776,751) Other (Income) and Expenditure (795,170) (30,368) (825,538)
(4,284) 81,613 77,329 (Surplus) or Deficit 25,445 70,336 95,781 
General Fund  HRA
Total General
Fund and HRA   General Fund  HRA
Total General
Fund and HRA
(116,980) (12,784) (129,764) Opening General Fund and HRA Balance (122,424) (16,241) (138,665)
(1,367) (2,917) (4,284) Less/plus (Surplus) or Deficit on General Fund 21,455 3,990 21,455
(4,077) (540) (4,617) Transfers to/from Other Reserves (59,814) (610) (60,424)
(122,424) (16,241) (138,665) Closing General Fund and HRA Balance (160,783) (12,861) (173,644) 
108

Page 109

49
Comprehensive Income and Expenditure Statement
The Comprehensive Income and Expenditure Statement shows the accounting cost in the year of providing services in accordance with the CIPFA Accounting Code of Practice, rather than the
amount to be funded from taxation. The council raises taxation to cover expenditure in accordance with regulations; this may be different from the accounting cost. The taxation position is shown in
the Expenditure and Funding Analysis and Movement in Reserves Statements. 
2021/22    2022/23 
Gross
Expenditure
£000 
Gross 
Income
£000
Net
Expenditure /
(Income)
£000  
Gross
Expenditure
£000 
Gross 
Income
£000
Net
Expenditure /
(Income)
£000       
200,564 39,461 161,103 Community and Enterprise Resources 207,615 40,192 167,423
443,501 50,889 392,612 Education Resources 470,521 50,652 419,869
121,979 73,157 48,822 Finance and Corporate Resources 132,358 75,167 57,191   
Housing and Technical Resources   
95,434 97,975 (2,541) - Housing Revenue Account 107,058 101,531 6,527
82,114 45,722 36,392 - Housing Other 87,463 53,842 33,621
460,173 249,068 211,105 Social Work Resources 493,104 262,552 230,552
2,313 - 2,313 Joint Board 2,151 0 2,151
5,018 860 4,158 Corporate Items 12,564 8,694 3,870
116 - 116 Corporate and Democratic Core (HRA) 115 - 115
- - - Non-Distributed Costs – Non-Operational Assets (HRA)  - - -
1,411,212 557,132 854,080 Net Cost of Services 1,513,949 592,630 921,319
- 2,752 (2,752) Other Operating Expenditure (Note 9) - 2,284 (2,284)
66,565 (202) 66,767 Financing and Investment (Income) and Expenditure (Note 10) 62,969 4,587 58,382
- 840,766 (840,766) Taxation and Non-Specific Grant Income (Note 11)  - 881,636 (881,636)
1,477,777 1,400,448 77,329 (Surplus) / Deficit on Provision of Services  1,576,918 1,481,137 95,781  
(113,178) (Surplus) / Deficit on Revaluation of Fixed Assets  (64,209)  
(365,042) Re-measurement of the Net Defined Benefit Liability / (Asset)  (282,589)  
(478,220) Other Comprehensive (Income) and Expenditure  (346,798)  
(400,891) Total Comprehensive (Income) and Expenditure   (251,016) 
Note 1  Internal recharges totalling £91.175m have been removed from the figures (2021/2022: £89.457m).   
109

Page 110

50 
Balance Sheet 
The Balance Sheet shows the value as at the Balance Sheet date of the assets and liabilities recognised by the
council. The net assets of the council (assets less liabilities) are matched by the reserves held by the council.
Reserves are reported in two categories.
■ The first category of reserves are usable reserves, that is those reserves that the council may use to provide
services, subject to the need to maintain a prudent level of reserves and any statutory limitations on their use (for
example the Capital Receipts Reserve that may only be used to fund capital expenditure or repay debt).
■ The second category of reserves is those that the council is not able to use to provide services.
This category of reserves includes reserves that hold unrealised gains and losses (for example the Revaluation
Reserve), where amounts would only become available to provide services if the assets are sold; and reserves that
hold timing differences shown in the Movement in Reserves Statement line ‘Adjustments between accounting
basis and funding basis under regulations’. 
31 March 2022
£000   
Note  31 March 2023
£000
3,666,092 Property, Plant and Equipment 20 3,748,327
3,826 Heritage Assets 21 3,826
247 Intangible Assets 21 190
1,830 Long Term Debtors  1,809
- Other Long Term Assets (Pension)  52,761
3,671,995 Non Current Assets  3,806,913    
25,006 Short Term Investments  70,458
3,789 Inventories  4,317
92,714 Short Term Debtors 23 79,587
213 Assets Held for Sale 21 3,408
91,476 Cash and Cash Equivalents (see cash flow notes)  65,890
213,198 Current Assets  223,660    
(52,459) Short Term Borrowing 32 (31,111)
(190,713) Short Term Creditors 25 (213,948)
- Contract Liability – IFRS15 7 -
(7,157) Other Short Term Liabilities (PPP / Finance Leases) 28 (7,098)
(2,109) Provisions 26 (2,353)
(6,403) Receipts in Advance 27 (1,320)
(258,841) Current Liabilities  (255,830)    
(611) Long Term Provisions 26 (598)
(949,602) Long Term Borrowing 32 (1,014,532)
(179,133) Other Long Term Liabilities (PPP / Finance Lease) 28 (172,036)
(160,445) Other Long Term Liabilities (Pension) 30 -
(1,289,791) Long Term Liabilities  (1,187,166)    
2,336,561 Net Assets  2,587,577    
152,186 Usable Reserves  187,441
2,184,375 Unusable Reserves  2,400,136
2,336,561 Total Reserves  2,587,577 
The notes on pages 55 to 108 form part of the financial statements. The unaudited accounts were authorised for
issue on 27 June 2023. 
Paul Manning
Executive Director (Finance and Corporate Resources)
27 June 2023
110

Page 111

51 
Movement in Reserves Statement
This statement shows the movement in the year on the different reserves held by the council, analysed into ‘usable reserves’ (those that can be applied to fund expenditure or reduce local
taxation) and other reserves. The Surplus or (Deficit) on the Provision of Services line shows the true economic cost of providing the council’s services, more details of which are shown in
the Comprehensive Income and Expenditure Statement. These are different from the statutory amounts required to be charged to the General Fund Balance and the Housing Revenue
Account for council tax setting and dwellings rent setting purposes. The Net Increase / Decrease before Transfers to Earmarked Reserves line shows the statutory General Fund Balance and
Housing Revenue Account Balance before any discretionary transfers to or from earmarked reserves undertaken by the council. 
Revenue
Statutory
Fund
Revenue
Statutory
Fund     
General
Fund
Balance
£000 
Housing
Revenue
Account
£000
Repairs and
Renewals
Fund
£000
Insurance
Fund
£000
Capital
Statutory
Fund
£000
Capital
Receipts
Reserve
£000
Total Usable
Reserves
£000
(Note 13)
Unusable
Reserves
£000
Total
Council
Reserves
£000
Balance at 1 April 2022 122,424 16,241 6,496 1,295 4,115 1,615 152,186 2,184,375 2,336,561
Movement in reserves
during 2022/23         
Total Comprehensive 
Expenditure and Income
(96,087) 306 - - - - (95,781) 346,797 251,016          
Adjustments to usable reserves
permitted by accounting standards
(note 8)
13,161 18,499 - - - - 31,660 (31,660) -          
Adjustments between accounting basis
and funding basis under regulations
(note 8)
61,471 (22,795) - - - 967 39,643 (39,643) -
Net Increase / (Decrease) before
Transfers to Reserves
(21,455) (3,990) - - - 967 (24,478) 275,494 251,016          
Transfers to/ (from) Reserves  59,814 610 1,114 116 661 (2,582) 59,733 (59,733) -          
Increase / (Decrease) in Year 38,359 (3,380) 1,114 116 661 (1,615) 35,255 215,761 251,016          
Balance at 31 March 2023 carried
forward
160,783 12,861 7,610 1,411 4,776 - 187,441 2,400,136 2,587,577
111

Page 112

52   
Revenue
Statutory
Fund
Revenue
Statutory
Fund     
General
Fund
Balance
£000 
Housing
Revenue
Account
£000
Repairs and
Renewals
Fund
£000
Insurance
Fund
£000
Capital
Statutory
Fund
£000
Capital
Receipts
Reserve
£000
Total Usable
Reserves
£000
(Note 13)
Unusable
Reserves
£000
Total
Council
Reserves
£000
Balance at 1 April 2021 116,980 12,784 7,484 2,304 4,334 1,934 145,820 1,789,850 1,935,670
Movement in reserves
during 2021/22         
Total Comprehensive 
Expenditure and Income
(81,564) 4,235 - - - - (77,329) 478,220 400,891          
Adjustments to usable reserves
permitted by accounting standards
(note 8)
12,360 18,020 - - - - 30,380 (30,380) -          
Adjustments between accounting basis
and funding basis under regulations
(note 8)
70,571 (19,338) - - - 2,082 53,315 (53,315) -
Net Increase / (Decrease) before
Transfers to Reserves
1,367 2,917 - - - 2,082 6,366 394,525 400,891          
Transfers to/ (from) Reserves  4,077 540 (988) (1,009) (219) (2,401) - - -          
Increase / (Decrease) in Year 5,444 3,457 (988) (1,009) (219) (319) 6,366 394,525 400,891          
Balance at 31 March 2022 carried
forward
122,424 16,241 6,496 1,295 4,115 1,615 152,186 2,184,375 2,336,561
112

Page 113

53
Cash Flow Statement 
The Cash Flow Statement shows the changes in cash and cash equivalents of the council during the reporting period. The statement
shows how the council generates and uses cash and cash equivalents by classifying cash flows as operating, investing and financing
activities. The amount of net cash flows arising from operating activities is a key indicator of the extent to which the operations of the
council are funded by way of taxation and grant income or from the recipients of services provided by the council. Investing activities
represent the extent to which cash outflows have been made for resources which are intended to contribute to the council’s future
service delivery. Cash flows arising from financing activities are useful in predicting claims on future cash flows by providers of capital
(that is borrowing) to the council. Further analysis of movements is provided in the cash flow notes following the statement. 
2021/22
£000 
2022/23
£000
(77,329) Net surplus / (deficit) on the provision of services (95,781)
181,830 Adjust net surplus / deficit on the provision of services for non cash movements 197,355
(63,443) Adjust for items included in the net surplus / deficit on the provision of services that are
investing and financing activities
(64,265)
41,058 Net cash flows from Operating Activities 37,309   
(39,809) Investing Activities (98,554)
(19,507) Financing Activities 35,659   
(18,258) Net increase / (decrease) in cash and cash equivalents (25,586)
109,734 Cash and cash equivalents at the beginning of the reporting period 91,476
91,476 Cash and cash equivalents at the end of the reporting period 65,890 
Cash Flow Statement Note – Non-Cash Movements 
The balance of non-cash movements is made up of the following elements: 
31 March
2022
£000 
31 March 
2023
£000
101,361 Depreciation, impairment and amortisation of assets 95,794
16,882 Movement in creditors 16,869
(19,684) Movement in debtors 9,126
(9) Movement in inventories (528)
82,414 Movement in pension liability 69,383
866 Carrying amount of non-current assets and non-current assets held for sale, sold or
derecognised
6,711
- Other non cash items charged to the net surplus / deficit on the provision of services 
181,830 Net cash flows from the provision of services for non cash movements 197,355 
Cash Flow Statement Note – Operating Activities – Items Included in Net Surplus / (Deficit) on the
Provision of Services That are Investing and Financing Activities 
The cash flows for these activities include the following items: 
2021/22
£000 
2022/23
£000
(59,825) Capital grants and contributions (55,271)
(3,618) Capital receipts applied (8,994)
(63,443) Net cash flows from items included in the net surplus / (deficit) on the provision of
services that are investing and financing activities
(64,265) 
Cash Flow Statement Note – Investing Activities 
2021/22
£000 
2022/23
£000
(133,644) Purchase of property, plant and equipment and intangible assets (123,668)
(84,000) Purchase of short term investments (274,050)
3,618 Proceeds from the sale of property, plant and equipment and intangible assets 8,994
107,000 Proceeds from short term investments 229,050
67,217 Other receipts from investing activities 61,120
(39,809) Net cash flows from investing activities (98,554) 
113

Page 114

54 
Cash Flow Statement Note – Financing Activities 
2021/22
£000 
2022/23
£000
28,900 Cash receipts of short term and long term borrowing 86,700
(7,453) Cash payments for the reduction of the outstanding liabilities relating to finance leases for
PPP contracts
(7,157)
(40,954) Repayments of short term and long term borrowing (43,884)
(19,507) Net cash flows from financing activities 35,659 
Cash Flow Statement Note – Cash and Cash Equivalents 
31 March
2022
£000 
31 March
2023
£000
97 Cash held by officers 103
4,297 Bank current accounts  (25,172)
87,082 Short term deposits 90,959
91,476 Total cash and cash equivalents 65,890 
The credit figures shown against Bank Accounts in 2023 relate to balances in the financial ledger. This is due to timing differences in
posting transactions in the ledger. Actual balances held at bank are not in an overdraft position. 
114

Page 115

55 
Notes to the Financial Statements 
Note 1 Accounting Standards Issued but Not Adopted 
The Accounting Code of Practice requires the council to disclose information relating to the impact of an accounting change that
is required by a new standard that has been issued but not yet adopted. 
For this disclosure, the standards introduced by the 2023/2024 Code, which are required to be applied by 1 April 2023, and will
be adopted by the council on 1 April 2023: 
• Definition of Accounting Estimates (amendments to IAS 8). The amendments aim to improve accounting policy disclosures
and to help users of the financial statements to distinguish between changes in accounting estimates and changes in ac-
counting policies. 
• Disclosure of Accounting Policies (amendment to IAS 1) This requires organisations to disclose their material accounting
policy information rather than their significant accounting policies. 
• Deferred Tax related to Assets and Liabilities arising from a Single Transaction (Amendments to IAS 12). The main change
is an exemption from the initial recognition exemption. 
The amendments are effective for annual periods beginning on or after 1 January 2023 and there is therefore no impact on the
2022/23 financial statements. 
• The implementation of IFRS 16 for Lease Accounting which should have been adopted with effect from 1 April 2022 has
now been deferred until 1 April 2024 with local government bodies having the option to adopt earlier if they decide to do so.
This standard replaces IAS 17 and removes the operating classification for leases, eliminating the ability for organisations
to keep operating leases off balance sheet, by reporting them as a note to the accounts. With the new standard all leases
will be considered finance leases unless they meet the specific exception criteria. The council has opted to defer imple-
mentation until 1 April 2024 
Adoption of the standards by the council on 1 April 2023 is not expected to have any impact on the financial statements. 
Note 2 Assumptions Made About the Future and Other Major Sources of Estimation
Uncertainty
The Financial Statements contain estimated figures that are based on assumptions made by the council about the future
or that are otherwise uncertain. Estimates are made taking into account historical experience, current trends and other
relevant factors. However, because balances cannot be determined with certainty, actual results could be materially
different from the assumptions and estimates.
The items in the council’s Balance Sheet at 31 March 2023 for which there is a significant risk of material adjustment in
the forthcoming financial year are as follows:
Item Uncertainties Effect if actual results differ from assumptions
Pensions
Liability –
Actuarial
Assumptions
Estimation of the liability to pay pensions depends
on a number of complex judgements relating to the
discount rate used, the rate at which salaries are
projected to increase, changes in retirement ages,
mortality rates and expected returns on pension
fund assets. A firm of consulting actuaries is
engaged by Strathclyde Pension Fund, to provide
the council with expert advice about the
assumptions to be applied.
Following decisions in relation to Age Discrimination
and Guaranteed Minimum Pensions, the Actuary
has included the estimated impact of these in the
reported pension liability figure. However, the actual
impact is influenced by a number of factors and
therefore the actual impact could vary from the
impact currently estimated and included in the
liability. 
The effects on the pension liability of changes in
individual assumptions can be measured. For
instance, a 0.1% decrease in the discount rate
assumption would result in an increase in the
pension liability of £37.168m. 
However, the assumptions interact in complex
ways. During 2022/2023, the council’s actuaries
advised that the net pension liability had increased
by £248.896m as a result of the return on fixed
assets and estimates being corrected through
experience and had decreased by £1,157.157m
attributable to the updating of the demographic and
financial assumptions. 
It is acknowledged that for 2022/2023, the Liability
is far outweighed by the Asset. 
Property, 
Plant and
Equipment –
Valuation
The Council’s assets are valued on a rolling
programme over a maximum of 5 years. The
valuation assumptions are ascertained by the
professional valuers used by the Council.
Given the current financial climate and the changes
in the economy experienced across the past 5
years, the Council’s valuers have considered the
If the actual results differ from the assumptions, the
value of the asset could be affected. 
The value of the assets subject to revaluation over
the rolling programme is £3,532.231m.
During 2022/2023 the assets that were revalued are
now held on the Balance Sheet at a total value of
£1,841.633m.
115

Page 116

56
Item Uncertainties Effect if actual results differ from assumptions
potential uncertainty regarding the valuation of
assets.  Their work has concluded that the
valuations are not subject to ‘material valuation
uncertainty’ due to the current economic climate as
at the valuation date.
The impact of a 1% change in these valuations
would change the value of the assets held on the
Balance Sheet by £18.416m, resulting in an
increase or decrease to the Revaluation Reserve or
change to Net Cost of Services. Any change would
also impact on depreciation charged to the Net Cost
of Services. 
Due to statutory mitigation, there would be no
impact on the council’s usable reserves. 
Property, 
Plant and
Equipment –
Useful Life
Assets are depreciated over useful lives that are
dependent on assumptions about the level of
repairs and maintenance that will be incurred in
relation to individual assets. The Council has a
programme of repairs and maintenance on its
assets.  Any decision to reduce spend in this area
could affect the useful lives of assets. 
If the useful life of assets is reduced, depreciation
increases and the carrying amount of the assets
falls, it is estimated that the annual depreciation
charge would increase and the carrying value would
fall by £10.821m for each year that useful lives were
reduced. 
This list does not include assets and liabilities that are carried at fair value based on a recently observed market price. 
Note 3 Material Items of Expenditure and Income 
Where material items of expenditure and income are not disclosed on the face of the Comprehensive Income and Expenditure
Statement, or contained within other notes, the Code requires disclosure of the nature and amounts of these items. Material items of
expenditure and income are detailed below:
Item Nature Amount
£000
Housing Benefit /
Discretionary Housing
Payment Paid 
Benefit paid to support customers on low income with Housing rent
costs
63,884
Housing Benefit /
Discretionary Housing
Benefit Received 
Benefit received to support customers on low income with Housing rent
costs
58,940 
116

Page 117

57 
Note 4 Notes to the Expenditure and Funding Analysis Statement Adjustments Between
Funding and Accounting Basis 
Adjustments from General Fund to arrive at the Comprehensive Income and Expenditure Statement 
2022/23       
Adjustments
for Capital
Purposes
(Note a)
£000 
Net change
for the
Pensions
Adjustments 
(Note b)
£000 
Other
Differences
(Note c)
£000
Total
Adjustments
between
Funding and
Accounting
Basis
£000
Community and Enterprise Resources 23,928 15,756 (141) 39,543
Education Resources 24,123 12,289 (26,150) 10,262
Finance and Corporate Resources 1,927 6,827 397 9,151
Housing and Technical Resources    
- Housing Revenue Account 7,646 2,509 (7,618) 2,437
- Housing Other 6,106 8,037 520 14,663
Social Work Resources 1,484 18,729 (119) 20,094
Joint Board - - - -
Corporate Items - 42 4,297 4,339
Corporate and Democratic Core (HRA) - - 115 115
Non-Distributed Costs – Non-Operational Assets (HRA) - - - -
Net Cost of Services 65,214 64,189 (28,699) 100,704
Other Income and Expenditure from the Expenditure
and Funding Analysis
(61,250) 5,194 25,688 (30,368)
Difference between General Fund surplus or deficit
and Comprehensive Income and Expenditure
Statement Surplus or Deficit on the Provision of
Services
3,964 69,383 (3,011) 70,336 
2021/22       
Adjustments
for Capital
Purposes
(Note a)
£000 
Net change
for the
Pensions
Adjustments 
(Note b)
£000 
Other
Differences
(Note c)
£000
Total
Adjustments
between
Funding and
Accounting
Basis
£000
Community and Enterprise Resources 21,217 17,782 (663) 38,336
Education Resources 32,205 13,497 (23,700) 22,002
Finance and Corporate Resources 2,276 7,370 (160) 9,486
Housing and Technical Resources    
- Housing Revenue Account 9,136 2,941 (11,701) 376
- Housing Other 6,775 9,205 1,730 17,710
Social Work Resources 3,307 21,612 (1,102) 23,817
Joint Board - - - -
Corporate Items - 421 442 863
Corporate and Democratic Core (HRA) - - 116 116
Non-Distributed Costs – Non-Operational Assets (HRA) - - - -
Net Cost of Services 74,916 72,828 (35,038) 112,706
Other Income and Expenditure from the Expenditure
and Funding Analysis
(67,340) 9,586 26,661 (31,093)
Difference between General Fund surplus or deficit
and Comprehensive Income and Expenditure
Statement Surplus or Deficit on the Provision of
Services
7,576 82,414 (8,377) 81,613 
117

Page 118

58
Note a – Adjustments for Capital Purposes
This column adds in depreciation and impairment and revaluation gains and losses in the services line, and for:
■ Other Operating Expenditure – adjusts for capital disposals with a transfer of income on disposal of assets and the amounts
written off for those assets.
■ Financing and Investment Income and Expenditure – the statutory charges for capital financing and other contributions are
deducted from other income and expenditure as these are not chargeable under generally accepted accounting practices.
■ Taxation and Non-Specific Grant Income and Expenditure – capital grants are adjusted for income not chargeable under generally
accepted accounting practices. Revenue grants are adjusted from those that are receivable in the year, to those that are
receivable without conditions or for which conditions were satisfied throughout the year. The Taxation and Non-Specific Grant
Income and Expenditure line is credited with capital grants receivable in the year without conditions or for which conditions were
satisfied in the year.
Note b – Net Change for the Pensions Adjustment
Net change for the removal of pension contributions and the addition of IAS19 Employee Benefits pension related expenditure and
income:
■ For Services this represents the removal of the employer pension contributions made by the council as allowed by statute and the
replacement with current service costs and past service costs.
■ For Financing and Investment Income and Expenditure – the net interest on the defined benefit liability is charged to the
Comprehensive Income and Expenditure Statement.
Note c – Other Differences
Other differences between amounts debited/credited to the Comprehensive Income and Expenditure Statement and amounts
payable /receivable to be recognised under statute:
■ For Services, this represents the accrual made for the cost of holiday leave entitlements earned by employees but not taken before
the year end which employees can carry into the next financial year. These require to be included in the Net Cost of Services
under generally accepted accounting practices, however, are not chargeable to the General Fund.
■ For Financing and Investment Income and Expenditure the other differences column recognises adjustments to the General Fund
for the timing differences for premiums and discounts. 
Note 5 Reconciliation of Adjustments Between Funding and Accounting Basis Shown in the
Expenditure and Funding Analysis (EFA) to Those Shown In the Movement in
Reserves Statement (MIRS) 
2021/22
£000 
2022/23
£000
81,613 Adjustments between Funding and Accounting Basis as per EFA 70,336
3,618 Transfer of non-current asset sale proceeds from revenue to Capital Receipts Reserve
(Note 8)
8,994
(1,536) Use of Capital Receipts Reserve to finance capital expenditure (Note 8) (8,027)
83,695 Adjustments between Funding and Accounting Basis as per MIRS 71,303
118

Page 119

59
Note 6  Expenditure and Income Analysed by Nature 
The council’s expenditure and income is analysed as follows: 
Community
and
Enterprise
£000 
Education
£000
Finance
and
Corporate
£000
Housing
Revenue
Account
£000
Housing
and
Technical
£000 
Social
Work
£000 
Joint
Boards
£000 
Corporate
Items
£000
Other
Non-
Resource
Lines
£000 
2022/23
Total
£000 
2021/22
Total
£000
Expenditure           
Employee Benefits Expenses 107,577 336,956 44,923 12,193 53,963 125,494 - (4,680) - 676,426 651,940
Other Services Expenditure 76,109 109,442 85,509 57,638 27,394 366,125 2,151 17,244 115 741,727 657,911
Support Services Recharges - - - - - - - - - - -
Depreciation, Amortisation,
Impairment
23,929 24,123 1,926 38,227 6,106 1,485 - - - 95,796 101,361
Interest Payment - - - - - - - - 59,710 59,710 56,802
Pension Net Interest Expense - - - - - - - - 5,193 5,193 9,586
Impairment on Financial Instruments - - - - - - - - (1,934) (1,934) 177
Loss on the Disposal of Assets - - - - - - - -   -
Total Expenditure 207,615 470,521 132,358 108,058 87,463 493,104 2,151 12,564 63,084 1,576,918 1,477,777
Income           
Fees and Charges and Other Service
Income
37,205 35,569 3,394 101,531 51,335 195,520 - 8,694 - 433,248 357,621
Interest and Investment Income - - - - - - - - 4,814 4,814 132
Impairment on Financial Instruments - - - - - - - - (227)   (227) (334)
Gain on the Disposal of Assets - - - - - - - - 2,284 2,284 2,752
Income from Council Tax - - - - - - - - 148,958 148,958 143,472
Government Grants and Contributions 2,987 15,083 71,773 - 2,507 67,032 - - 732,678 892,060 896,805
Total Income 40,192 50,652 75,167 101,531 53,842 262,552 - 8,694 888,507 1,481,137 1,400,448                     
Surplus or Deficit on the Provision
of Services
167,423 419,869 57,191 6,527 33,621 230,552 2,151 3,870 (825,423) 95,781 77,329
119

Page 120

60
Note 7 Revenue from Contracts with Service Recipients 
Amounts included in the Comprehensive Income and Expenditure Statement for contracts with service recipients. 
2021/22
£000 
2022/23
£000
42,373 Revenue from contracts with service recipients 44,877
- Impairment of receivables or contract assets -
42,373 Total included in Comprehensive Income and Expenditure Statement 44,877 
Amounts included in Balance Sheet for contracts with service recipients. 
2021/22
£000 
2022/23
£000
- Receivables which are included in debtors (note 23) -
- Contract Assets -
- Contract Liabilities -
- Total Included in Net Assets - 
Specific changes in the contract assets and the contract liabilities balances during the period are as follows: 
2021/22 2021/22  2022/23 2022/23
Contract
Asset
£000
Contract
Liability
£000 
Contract
Asset
£000
Contract
Liability
£000
- - Contract assets and liabilities at the beginning of the year - -
- - Increases / decreases due to cash received (paid) - -
- - Transfers from contract assets / (liabilities) recognised at the
beginning of the period to receivables (payables)
- -
- - Changes as a result of changes in the measure of progress - -
- - Contract assets and liabilities at the end of the year - - 
Note 8 Adjustments Permitted Under Accounting Standards and Between Accounting
Basis and Funding Basis Under Regulations
This note details the adjustments that are made to the total comprehensive income and expenditure recognised by the council
in the year in accordance with proper accounting practice to arrive at the resources that are specified by statutory provisions
as being available to the council to meet future capital and revenue expenditure. The following sets out a description of the
reserves that the adjustments are made against. 
General Fund
The General Fund is the statutory fund into which all the receipts of the council are required to be paid and out of which all
liabilities of the council are to be met, except to the extent that statutory rules might provide otherwise. These rules can also
specify the financial year in which liabilities and payments should impact on the General Fund, which is not necessarily in
accordance with proper accounting practice. The General Fund balance therefore summarises the resources that the council is
statutorily empowered to spend on its services or on capital investment (or the deficit of resources that the council is required to
recover) at the end of the financial year. 
Housing Revenue Account
The Housing Revenue Account balance reflects the statutory obligation to maintain a revenue account for local authority
housing in accordance with the Local Government and Housing (Scotland) Act 1987. It contains the balance of income and
expenditure as defined by the 1987 Act that is available to fund future expenditure in connection with the council’s landlord
function. 
Repairs and Renewals Fund
The Repairs and Renewals Fund comprises a combination of balances brought forward from previous years adjusted for any
utilisation of funds and contributions to the Fund in year. The funds will be used to deal with repairing or renewing council
assets.  
120

Page 121

61
Insurance Fund
The Insurance Fund is held as a provision against unpaid claims. Council Services contribute to the Fund which meets the cost
of property damage, public liability, employee liability, vehicle fleet and other claims. The council holds insurance cover to meet
any large claims, the premium for which is charged to the Fund. Actuarial reviews are undertaken on a regular basis. The last
full review took place during 2021. 
Capital Receipts Reserve
The Capital Receipts Reserve holds the proceeds from the disposal of land or other assets which are restricted by statute from
being used other than to fund new capital expenditure or to be set aside to finance historical capital expenditure. The balance on
the reserve shows the resources that have yet to be applied for these purposes at the year end.
121

Page 122

62
Usable Reserves       
2022/23 
General
Fund
Balance
£000 
Housing
Revenue
Account
£000
Repairs
And
Renewals
Fund
£000 
Insurance
Fund
£000 
Capital
Statutory
Funds
£000 
Capital
Receipts
Reserve
£000 
Total
£000
Adjustments to Usable Reserves Permitted by Accounting Standards       
Adjustment for the Revaluation Element of Depreciation 13,161 18,499 - - - - 31,660
Total Adjustments to Usable Reserves Permitted by Accounting Standards 13,161 18,499 - - - - 31,660        
Statutory Adjustments (Between Accounting and Funding Basis)       
Adjustments to Revenue Resources       
Amounts by which income and expenditure included in the Comprehensive Income and Expenditure
Statement are different from revenue for the year calculated in accordance with statutory
requirements:       
▪ Pensions Costs transferred to (or from) the Pensions Reserve 66,678 2,705 - - - - 69,383
▪ Financial Instruments (transferred to the Financial Instruments Adjustment Account) (276) (84) - - - - (360)
▪ Holiday Pay (transferred to (or from) the Accumulated Absences Reserve) (130) 3 - - - - (127)
▪ Reversal of entries included in the Surplus or Deficit on the Provision of Services in relation
to capital expenditure (these items are charged to the Capital Adjustment Account) 
42,620 20,872 - - - - 63,492
Total Adjustments to Revenue Resources 108,892 23,496 - - - - 132,388        
Adjustments between Revenue and Capital Resources       
Transfer of non-current asset sale proceeds from revenue to Capital Receipts Reserve (967) (8,027) - - - 8,994 -
Statutory Provision for the repayment of debt (transfer from Capital Adjustment Account) (2,524) - - - - - (2,524)
Capital expenditure financed from revenue balances (transfer to Capital Adjustment Account) (874) (26,050) - - - - (26,924)
Total Adjustments between Revenue and Capital Resources (4,365) (34,077) - - - 8,994 (29,448)        
Adjustments to Capital Resources       
Use of the Capital Receipts Reserve to finance capital expenditure - - - - - (8,027) (8,027)
Application of capital grants to finance capital expenditure (43,056) (12,214) - - - - (55,270)
Total Adjustments to Capital Resources (43,056) (12,214) - - - (8,027) (63,297)
Total Statutory Adjustments (Between Accounting and Funding Basis) 61,471 (22,795) - - - 967 39,643        
Total Adjustments to Usable Reserves Permitted by Accounting Standards 13,161 18,499 - - - - 31,660
Total Statutory Adjustments (Between Accounting and Funding Basis) 61,471 (22,795) - - - 967 39,643
Total Comprehensive Expenditure and Income (96,087) 306 - - - - (95,781)
Net Increase / (Decrease) before transfers to / (from) Reserves (21,455) (3,990) - - - 967 (24,478)
Transfers to / (from) Reserves 51,814 610 1,114 116 661 (2,582) 57,733
Increase / (Decrease) in Year 38,359 (3,380) 1,114 116 661 (1,615) 35,255
122

Page 123

63
Usable Reserves       
2021/22 
General
Fund
Balance
£000 
Housing
Revenue
Account
£000
Repairs
And
Renewals
Fund
£000 
Insurance
Fund
£000 
Capital
Statutory
Funds
£000 
Capital
Receipts
Reserve
£000 
Total
£000
Adjustments to Usable Reserves Permitted by Accounting Standards       
Adjustment for the Revaluation Element of Depreciation 12,360 18,020 - - - - 30,380
Total Adjustments to Usable Reserves Permitted by Accounting Standards 12,360 18,020 - - - - 30,380        
Statutory Adjustments (Between Accounting and Funding Basis)       
Adjustments to Revenue Resources       
Amounts by which income and expenditure included in the Comprehensive Income and Expenditure
Statement are different from revenue for the year calculated in accordance with statutory
requirements:       
▪ Pensions Costs transferred to (or from) the Pensions Reserve 79,100 3,314 - - - - 82,414
▪ Financial Instruments (transferred to the Financial Instruments Adjustment Account) (279) (81) - - - - (360)
▪ Holiday Pay (transferred to (or from) the Accumulated Absences Reserve) (458) (107) - - - - (565)
▪ Reversal of entries included in the Surplus or Deficit on the Provision of Services in relation
to capital expenditure (these items are charged to the Capital Adjustment Account) 
46,833 17,561 - - - - 64,394
Total Adjustments to Revenue Resources 125,196 20,687 - - - - 145,883        
Adjustments between Revenue and Capital Resources       
Transfer of non-current asset sale proceeds from revenue to Capital Receipts Reserve (2,082) (1,536) - - - 3,618 -
Retrospective Benefit from applying the revised guidance on Service Concessions - - - - - - -
Statutory Provision for the repayment of debt (transfer from Capital Adjustment Account) (2,401) (6,808) - - - - (9,209)
Capital expenditure financed from revenue balances (transfer to Capital Adjustment Account) (2,361) (19,637) - - - - (21,998)
Total Adjustments between Revenue and Capital Resources (6,844) (27,981) - - - 3,618 (31,207)        
Adjustments to Capital Resources       
Use of the Capital Receipts Reserve to finance capital expenditure - - - - - (1,536) (1,536)
Application of capital grants to finance capital expenditure (47,781) (12,044) - - - - (59,825)
Total Adjustments to Capital Resources (47,781) (12,044) - - - (1,536) (61,361)
Total Statutory Adjustments (Between Accounting and Funding Basis) 70,571 (19,338) - - - 2,082 53,315        
Total Adjustments to Usable Reserves Permitted by Accounting Standards 12,360 18,020 - - - - 30,380
Total Statutory Adjustments (Between Accounting and Funding Basis) 70,571 (19,338) - - - 2,082 53,315
Total Comprehensive Expenditure and Income (81,564) 4,235 - - - - (77,329)
Net Increase / (Decrease) before transfers to / (from) Reserves 1,367 2,917 - - - 2,082 6,366
Transfers to / (from) Reserves 4,077 540 (988) (1,009) (219) (2,401) -
Increase / (Decrease) in Year 5,444 3,457 (988) (1,009) (219) (319) 6,366
123

Page 124

64
Note 9 Comprehensive Income and Expenditure Statement – Other Operating Expenditure 
2021/22
£000 
2022/23
£000
(2,752) (Gains) / losses on the disposal of non-current assets (2,284)   
(2,752) Total (2,284) 
Note 10 Comprehensive Income and Expenditure Statement – Financing and Investment
Income and Expenditure 
2021/22
£000 
2022/23
£000
56,802 Interest payable and similar charges 59,710
9,586 Pensions interest cost and expected return on pensions assets 5,193
(132) Interest receivable and similar income (4,814)
511 Impairment on Financial Instruments (1,707)   
66,767 Total 58,382 
Note 11 Comprehensive Income and Expenditure Statement – Taxation and Non-Specific
Grant Income 
2021/22
£000 
2022/23
£000
(143,472) Council Tax income (148,958)
(319,312) National Non-Domestic Rates (422,591)
(318,157) Non-ringfenced Government grants (254,817)
(59,825) Capital grants and contributions (55,270)   
(840,766) Total (881,636)
124

Page 125

65
Note 12 Movements in Usable Reserves
This note sets out the movements in the Usable Reserves including amounts set aside in earmarked reserves to provide financing for future expenditure plans and the amounts posted
back from earmarked reserves to meet General Fund and HRA expenditure in 2022/2023. 
2021/22
Opening
Balance
1 April
2021
£000 
Transfers
Out
2021/22
£000 
Transfers
In
2021/22
£000
2021/22
Closing
Balance
31 March
2022
£000
2022/23
Opening
Balance
1 April
2022
£000 
Transfers
Out
2022/23
£000 
Transfers
In
2022/23
£000
2022/23
Closing
Balance
31 March
2023
£000
Future Budget Strategies – allocated to specific years 20,306 (9,109) 22,474 33,671 33,671 (36,281) 97,716 95,106
Investments (Multi Year) - - 5,884 5,884 5,884 (2,931) 946 3,899
Developing Scotland’s Young Workforce (Specific funding) 398 (90) - 308 308 - -  308
Early Years (Multi-year) 11,116 (66) 3,415 14,465 14,465 (2,948) -  11,517
Children and Young People Act inc. Getting It Right for Every Child (Multi-year) 2,163 (1,479) - 684 684 (7) -  677
Pupil Equity Fund (Specific funding) 2,326 (2,326) 2,590 2,590 2,590 (2,590) 905 905
Discretionary Housing Payments - - - - -  - 115 115
Warm Welcome Initiative - - - - -  - 299 299
Alternative Fuel Payments - - - - -  - 191 191
Energy Bill Support Scheme - - - - -  - 1,055 1,055
Wellbeing Day - - - - -  - 600 600
Multi Year Projects 4,072 (214) 760 4,618 4,618 (1,111) -  3,507
Schools (Multi-year) 2,094 (739) 1,223 2,578 2,578 (1,223) -  1,355
Scheme of Assistance 344 - 398 742 742 - -  742
Property Masterplan 236 (27) - 209 209 (3) -  206
Community and Enterprise Resources including Public Health and Local Plan 710 (305) 676 1,081 1,081 - -  1,081
Social Work and Bequest 21 - - 21 21 - -  21
Temporary Homelessness / Community Safety (Specific funding) 2,536 (598) - 1,938 1,938 (363) -  1,575
Scottish Welfare Fund 129 (129) - - - - 145  145
Prevent Grant (Specific funding) 9 - - 9 9 - -  9
New Initiatives (Multi-year) 914 (2) - 912 912 - -  912
Sanitary Products Funding 339 - - 339 339 - -  339
Counselling in Schools 1,256 - - 1,256 1,256 - -  1,256
Additional Support for Learning 1,289 (100) - 1,189 1,189 - -  1,189
Grants to Voluntary Organisations - Area Grants c/f 60 - 63 123 123 - 84 207
National Trauma Training Programme - - 50 50 50 (38) -  12
Children and Families - Residential Care 762 (762) 2,051 2,051 2,051 (2,051) 5,635 5,635
Lanarkshire Valuation Joint Board - Scottish Government funding 277 (159) - 118 118 - -  118
Child Disability Support - - 83 83 83 - -  83
Whole Family Wellbeing - - 187 187 187 (58) -  129
Telecare Fire and Safety - - 59 59 59 - -  59
Local Heat and Energy Efficient Strategies - - - - - - 75 75
COVID-19 Funding (inc. LACER) 32,390 (26,185) 23,856 30,061 30,061 - (18,403) 11,658
Scottish Government – 2021/2022 General Revenue Grant Adjustment 155 (155) - - - - - -         
Total Earmarked General Fund 83,902 (42,445) 63,769 105,226 105,226 (68,007) 107,766 144,985
125

Page 126

66 
2021/22
Opening
Balance
1 April
2021
£000 
Transfers
Out
2021/22
£000 
Transfers
In
2021/22
£000
2021/22
Closing
Balance
31 March
2022
£000
2022/23
Opening
Balance
1 April
2022
£000 
Transfers
Out
2022/23
£000 
Transfers
In
2022/23
£000
2022/23
Closing
Balance
31 March
2023
£000
Uncommitted General Fund        
Funding for Future Strategies 20,035 (15,880) - 4,155 4,155 (1,400) - 2,755
Uncommitted General Fund 13,043 - - 13,043 13,043 - - 13,043
Total Uncommitted General Fund 33,078 (15,880) - 17,198 17,198 (1,400) - 15,798         
Total General Fund 116,980 (58,325) 63,769 122,424 122,424 (69,407) 107,766 160,783         
Repairs and Renewals        
Crematorium Sinking Fund and Shelter 307 - 25 332 332 (141) 50 241
Fleet Sinking Fund 173 - 40 213 213 -  40 253
Waste 1,435 - 302 1,737 1,737 -  1,290 3,027
Committee Room Audio Visual Upgrade 150 (11) - 139 139 (139)  - -
Repairs and Restorations (Various Projects) 3,339 (172) 504 3,671 3,671 (136) 150 3,685
Winter Maintenance 2,080 (1,676) - 404 404 - -  404
Total Repairs and Renewals 7,484 (1,859) 871 6,496 6,496 (416) 1,530 7,610         
Capital Fund        
Capital Fund - - - - - - - -
Education Capital Items Replacement Fund 1,728 - 572 2,300 2,300  - 406 2,706
Adoptions 278 - 1 279 279 - -  279
IT Development Fund / Digital Transformation 1,842 (565) 92 1,369 1,369 (68) -  1,301
Central Energy Efficiency Fund 486 (541) 222 167 167 (282) 605 490
Total Capital Fund 4,334 (1,106) 887 4,115 4,115 (350) 1,011 4,776             
Total Usable Capital Receipts 1,934 (3,937) 3,618 1,615 1,615 (2,582) 967 -             
Total Insurance Fund 2,304 (1,015) 6 1,295 1,295 - 116 1,411             
Total Housing Revenue Account 12,784 - 3,457 16,241 16,241 (3,990) 610 12,861             
Total Usable Reserves 145,820 (66,242) 72,608 152,186 152,186 (76,745) 112,000 187,441
126

Page 127

67
Note 13 Balance Sheet – Unusable Reserves
Unusable Reserves are those that the council is not able to utilise to provide services. These reserves are kept to manage the
accounting processes for non-current assets, financial instruments and retirement benefits and that do not represent usable
resources for the council.
The two reserves arising from the system of capital accounting are the Revaluation Reserve and the Capital Adjustment
Account. The former represents the gains on revaluation of fixed assets not yet realised through sales and the latter relates to
amounts set aside from capital resources to meet past expenditure.
The reserve arising from accounting for financial instruments is the Financial Instruments Adjustment Account. This is a
balancing account to allow for differences in statutory requirements and proper accounting practices for lending and borrowing
by the council.
The Pensions Reserve arises from IAS19 Accounting Disclosures for Retirement Benefits and recognises the council’s share of
actuarial gains and losses in the Strathclyde Pension Fund and the change in the council’s share of the Pension Fund liability
chargeable to the CIES.
The Accumulated Absences Reserve arises from IAS19 accounting disclosures for Short Term Accumulated Benefits and
recognises the council’s liability for compensated absences (annual leave) earned by staff but not taken in the year. The
Statutory Arrangements require that the impact on the General Fund Balance is neutralised by transfers to or from the Reserve.
127

Page 128

68
Unusable Reserves      
2022/23 
Revaluation
Reserve
£000 
Capital
Adjustment
Account
£000 
Financial
Instruments
Adjustment
Account
£000 
Pension
Reserve
£000
Accumulating
Compensated 
Absences
Adjustment
Account
£000 
Total
£000       
Opening Balance 1,362,958 1,009,130 (4,571) (160,445) (22,697) 2,184,375
Movement in Year 32,523 (30,455) 360 213,206 127 215,761
Closing Balance 1,394,433 979,724 (4,211) 52,761 (22,570) 2,400,137       
Other Comprehensive Income and Expenditure 64,209 - - 282,589 - 346,798       
Adjustments to Usable Reserves Permitted by Accounting Standards      
Difference Between Fair Value and Historic Cost Depreciation (31,660) - - - - (31,660)       
Adjustments Between Accounting Basis and Funding Basis Under
Regulation      
Charges for Depreciation and Impairment of Non-Current Assets - (66,021) - - - (66,021)
Revaluation Gains / Losses on Property, Plant and Equipment - 1,962 - - - 1,962
Amortisation of Intangible Assets - (75) - - - (75)
Non-Current Assets Written Off on Disposal or Sale - (6,637) - - - (6,637)
Accumulated Gains on Assets Sold or Scrapped (73) - - - - (73)
Use of Capital Receipts Reserve to Finance New Capital Expenditure - 8,027 - - - 8,027
Capital Grants and Contributions - 55,270 - - - 55,270
Statutory Charge for the Repayment of Debt - 7,352 - - - 7,352
Statutory Provision for Financing of Capital Investment - 2,524 - - - 2,524
Capital Expenditure Charged Against the General Fund and HRA Balance - 26,924 - - - 26,924
Retrospective Benefit from applying revised Service Concession Guidance - (59,733) - - - (59,733)
Transfer Between Revaluation Reserve and Capital Adjustment Account 48 (48) - - - -
Premiums to be Charged Against the General Fund and HRA Balance - - 360 - - 360
Reversal of Items Relating to Retirement Benefits - - - (130,940) - (130,940)
Employer’s Pension Contribution Payable in Year - - - 61,557 - 61,557
Amounts Accrued at the End of the Financial Year - - - - 127 127
Total Movement in Year 32,523 (30,455) 360 213,206 127 215,762 
128

Page 129

69
Unusable Reserves      
2021/22 
Revaluation
Reserve
£000 
Capital
Adjustment
Account
£000 
Financial
Instruments
Adjustment
Account
£000 
Pension
Reserve
£000
Accumulating
Compensated 
Absences
Adjustment
Account
£000 
Total
£000       
Opening Balance 1,217,136 1,043,980 (4,931) (443,073) (23,262) 1,789,850
Restatement of 2020/2021 Balance** 63,379 (63,379) - - - -
Revised Opening Balance 1,280,515 980,601 (4,931) (443,073) (23,262) 1,789,850
Movement in Year 82,443 28,529 360 282,628 565 394,525
Closing Balance 1,362,958 1,009,130 (4,571) (160,445) (22,697) 2,184,375       
Other Comprehensive Income and Expenditure 113,178 - - 365,042 - 478,220       
Adjustments to Usable Reserves Permitted by Accounting Standards      
Difference Between Fair Value and Historic Cost Depreciation (30,380) - - - - (30,380)       
Adjustments Between Accounting Basis and Funding Basis Under
Regulation      
Charges for Depreciation and Impairment of Non Current Assets - (63,127) - - - (63,127)
Revaluation Gains / Losses on Property, Plant and Equipment - (7,773) - - - (7,773)
Amortisation of Intangible Assets - (81) - - - (81)
Non Current Assets Written Off on Disposal or Sale - (511) - - - (511)
Accumulated Gains on Assets Sold or Scrapped (355) - - - - (355)
Use of Capital Receipts Reserve to Finance New Capital Expenditure - 1,536 - - - 1,536
Capital Grants and Contributions - 59,825 - - - 59,825
Statutory Charge for the Repayment of Debt - 9,209 - - - 9,209
Statutory Provision for Financing of Capital Investment - 7,453 - - - 7,453
Capital Expenditure Charged Against the General Fund and HRA Balance - 21,998 - - - 21,998
Premiums to be Charged Against the General Fund and HRA Balance - - 360 - - 360
Reversal of Items Relating to Retirement Benefits - - - (139,979) - (139,979)
Employer’s Pension Contribution Payable in Year - - - 57,565 - 57,565
Amounts Accrued at the End of the Financial Year - - - - 565 565
Total Movement in Year 82,443 28,529 360 282,628 565 394,525 
** The opening balance (as at 1 April 2021) on the Revaluation Reserve and the Capital Adjustment Account have been restated to correct an error which had arisen from the software used
for accounting for non-current asset revaluation losses’ The system had written off revaluation losses off in error which resulted in the Revaluation Reserve being understated by £63.379
million, and the Capital Adjustment Account being overstated by the same amount.  There is no impact on the asset balances in the Balance Sheet.
129

Page 130

70 
Note 14 Members Allowances 
The council paid the following amounts to Members of the council during the year: 
2022/23
£
2021/22
£
Salaries 1,138,350 1,064,313
Mileage Allowance 17,563 2,756
Expenses 4,708 583
Total 1,160,621 1,067,652 
Note 15 External Audit Costs 
The council has incurred the following external audit costs: 
2022/23
£000
2021/22
£000
Fee payable to Audit Scotland for external audit services 586 521
Total 586 521 
The council incurred these costs in relation to the audit of the Annual Accounts, the certification of grant claims and a contribution
towards Audit Scotland’s national work programme. Fees payable in respect of other services provided by the appointed auditor were
nil (2021/2022: nil).
Note 16 Related Parties 
The council is required to disclose material transactions with related parties – bodies or individuals that have the potential to control
or influence or to be controlled or influenced by the council. Disclosure of these transactions allows readers to assess the extent to
which the council might have been constrained in its ability to operate independently or might have secured the ability to limit
another party’s ability to bargain freely with the council. 
Central Government
Central government has effective control over the general operations of the council – it is responsible for providing the statutory
framework within which the council operates, provides the majority of its funding in the form of grants and prescribes the terms of
many transactions that the council has with other parties (e.g. council tax bills, housing benefits). Grants received from government
departments are set out in the subjective analysis in Note 6. 
Officers
During 2022/2023, no senior officer of the council declared an interest in any organisation outwith those controlled or significantly
influenced by the council. In addition, no senior officer declared an interest of close family members in any organisations outwith
those controlled or significantly influenced by the council. 
During 2021/22, no senior officer of the council declared an interest in any organisation outwith those controlled or significantly
influenced by the council. In addition, no senior officer declared an interest of close family members in any organisations outwith
those controlled or significantly influenced by the council. 
The total remuneration paid to senior officers is shown in the Remuneration Report on page 33. 
Members
Members of the council have direct control over the council’s financial and operating policies. The total of members’ allowances
paid in 2022/2023 is shown in Note 14. During 2022/2023, works and services to the value of £4.031 million were commissioned
from companies in which 15 members had an interest (2021/2022 - £5.088 million). Contracts were entered into in full compliance
with the council’s standing orders. In addition, grants totalling £2.454 million were paid to voluntary organisations in which 46
members had an interest (2021/2022 - £3.253 million). The relevant members did not take part in any discussion or relating to the
grants. Details of these transactions are recorded under each individual Councillor and can be found on the council’s website
(Elected Members Interests). As these payments relate to payments ledgered in the financial year, there are no outstanding
balances to be disclosed. 
The council has chosen a de minimis level of £0.100m as its threshold disclosure level for individual members interests in
companies and voluntary organisations.  In addition to the entities controlled or significantly influenced by the council (page 71), the
council made individual payments above this threshold to the following companies and voluntary organisations in which members
held an interest.  These are detailed in the table overleaf. 
130

Page 131

71 
Member Organisation Individual Payment exceeding £0.100m
Cllr John Anderson
Cllr Carol Nugent 
Clyde Gateway 4 payments totalling £0.700m in relation to the
Shawfield Regeneration Route project.
Cllr Graeme Horne 
Cllr Susan Kerr 
SEEMIS 1 payment totalling £0.347m in respect of the council’s
annual membership fee. 
Cllr Alex Allison
Cllr John Anderson
Cllr Walter Brogan
Cllr Maureen Chalmers
Cllr Gerry Convery
Cllr Margaret Cooper
Cllr Maureen Devlin
Cllr Joe Fagan
Cllr Gladys Ferguson-Miller
Cllr Lynsey Hamilton
Cllr Graham Horne
Cllr Eileen Logan
Cllr Katy Loudon
Cllr Hugh McDonald
Cllr David McLaughlin
Cllr Richard Nelson
Cllr John Ross 
COSLA 2 payments totalling £0.325m for the annual
subscription to myjobscotland (£0.263m) and
(£0.062m) to for the local Government Digital Office. 
Cllr Allan Falconer North Lanarkshire
Council
1 payments totalling £0.114m in relation to inter
authority children’s placements (£0.054m) and cross
boundary charges (£0.060m). 
Receipts and Payments Between the Council and Entities Controlled or Significantly Influenced by the Council 
2022/23
Receipts
£000
2022/23
Payments
£000
2021/22
Receipts
£000
2021/22
Payments
£000
Subsidiaries:    
Common Good Fund 46 78 36 91
Routes to Work South - 1,810 - 1,486
South Lanarkshire Leisure and Culture Limited  2,968 25,013 2,931 21,048
Total Subsidiaries 3,014 26,901 2,967 22,625     
Joint Ventures:    
South Lanarkshire HSCP Integration Joint Board  230,654 173,108 211,798 153,085
Total Joint Ventures 230,654 173,108 211,798 153,085     
Joint Boards:    
Lanarkshire Valuation Joint Board 163 2,103 166 2,265
Strathclyde Concessionary Travel Scheme Joint Committee - 13,878 1,983 11,339
Strathclyde Partnership for Transport - 604 - 604
Total Joint Boards 1,827 16,585 2,149 14,208     
Other Entities:    
Clyde Valley Learning and Development Joint Committee 59 10 59 15
Regen FX Youth Trust - 115 - 113
SEEMIS Group LLP 84 368 83 332
Total Other Entities 143 493 142 460     
Total 235,638 217,087 217,056 190,378 
The amounts due (to) / from related parties are detailed overleaf: 
131

Page 132

72 
2022/23
£
2021/22
£
Strathclyde Partnership for Transport 1,664 2,390
South Lanarkshire Leisure and Culture Limited 1,520 1,923
South Lanarkshire Health and Social Care Partnership (8,863) (7,828) 
Subsidiaries
Common Good Fund
The Common Good Fund is for the benefit of the geographical areas of the former burghs and is administered by the council. 
Routes to Work South
Established in 1998, Routes to Work South’s main activity is supporting unemployed and workless residents in South Lanarkshire
into employment, training, or further education. Routes to Work South delivers services to, and is funded by, the council. South
Lanarkshire Council is the sole member of Routes to Work South and is included in the council’s group financial statements as a
100% subsidiary. 
South Lanarkshire Leisure and Culture Limited
South Lanarkshire Leisure and Culture Limited was established as a Charitable Trust on 1 April 2002. The Trust became South
Lanarkshire Leisure and Culture Limited in October 2010, when cultural services transferred from South Lanarkshire Council. South
Lanarkshire Leisure and Culture Limited provides the council with a full range of leisure and cultural activities within the South
Lanarkshire area. Whilst the Trust is entirely independent of the council under law and for taxation purposes, its activities are
directed by means of contractual arrangements with the council, and, in recognition of this, South Lanarkshire Leisure and Culture
Limited is treated as a 100% subsidiary, and included in the council’s group financial statements. From 3 April 2023, the status of
South Lanarkshire Leisure and Culture Limited will change from a Charitable Trust to a Scottish Charitable Incorporated
Organisation. This will have no impact on the relationship with the Council.   
Joint Ventures
South Lanarkshire Health and Social Care Partnership Integration Joint Board
The South Lanarkshire HSCP Integration Joint Board was established on 6 October 2015 as a partnership between South
Lanarkshire Council and NHS Lanarkshire and is responsible for planning and seeing the delivery of a full range of community
health and social work / social care services. In the year 2021/2022, the following financial transactions were made between South
Lanarkshire Council and South Lanarkshire HSCP Integration Joint Board relating to the integrated and social care functions: 
2022/23
£000
2021/22
£000
Contribution made to South Lanarkshire HSCP Integration Joint Board 173,108 153,085
Commissioning income received from South Lanarkshire HSCP Integration Joint Board 230,654 211,798
South Lanarkshire HSCP Integration Joint Board due (to)/from South Lanarkshire Council (8,863) (7,828) 
Joint Boards
The council is represented on a number of joint boards which are independent public bodies formed by an Act of Parliament. These
bodies are Lanarkshire Valuation Joint Board, Strathclyde Concessionary Travel Scheme and Strathclyde Partnership for
Transport. All local government functions that relate to these bodies have been delegated from the constituent councils that
comprise the area of each board. The members of each board are elected councillors and appointed by the councils in proportions
specified in the legislation.
The council has no shares, or ownership of any of these boards. Nevertheless, these boards are included within the council’s group
accounts as associate, as the council is represented on the board and participate in policy making processes. The council’s share
of each board’s net assets is calculated on its percentage share of the aggregate contributions made by the constituent councils.
Other entities
Details of all other public bodies in which the council has a significant interest are explained in the group accounts at Notes 4 to 7.
Note 17 Leases 
Council as Lessee
Finance Leases
The council currently has obligations in relation to Glasgow Southern Orbital infrastructure and secondary schools. These are classed
as PPP/PFI finance leases and are reported under Note 28 – Public Private Partnerships and Similar Contracts.
Operating Leases 
The council has entered into a number of operating leases and details are provided across the asset categories of Vehicles, Property,
Plant and Equipment, and Land and Buildings.
132

Page 133

73 
Vehicles, Plant and Equipment – the council uses vehicles, computers, photocopying equipment and items of plant financed under the
terms of an operating lease. The amount paid under these arrangements in 2022/2023 was £3.316 million (2021/2022 £3.774 million).
Land and Buildings – the council leases a number of properties which have been accounted for as operating leases. The rentals
payable in 2022/2023 were £2.476 million (2021/2022 were £2.726 million).
The future minimum lease payments due under non-cancellable leases in future years are: 
31 March 
2023
£000
31 March 
2022
£000
Not later than one year 4,445 4,962
Later than one year and not later than five years 9,934 10,421
Later than five years 34,646 36,393
Total 49,025 51,776 
The sub lease payments receivable in future years are: 
31 March 
2023
£000
31 March 
2022
£000
Not later than one year 319 322
Later than one year and not later than five years 356 1,134
Later than five years - -
Total 675 1,456 
The expenditure charged to the Comprehensive Income and Expenditure Statement during the year in relation to these leases was: 
2022/23
£000
2021/22
£000
Minimum lease payments 5,792 6,500
Sublease payments receivable (368) (365)
Total 5,424 6,135 
Council as Lessor 
Operating Leases
The council leases out property under operating leases. The purpose of the Lease Portfolio is principally Socio Economic – by
supporting the wider corporate objectives of the council as stated in the Council Plan, Connect 2017-22, through strategic influence,
control, occupational use and management of lease agreements. In particular, but not exclusively, to ‘support the local Economic
Development by providing the right conditions for growth, improving skills and employability’. 
The future minimum lease payments receivable under non-cancellable leases in future years are: 
2022/23
£000
2021/22
£000
Not later than one year 4,473 4,903
Later than one year and not later than five years 10,043 18,820
Later than five years 95,136 111,483
Total 109,652 135,206 
The minimum lease payments receivable do not include rents that are contingent on events taking place after the lease was entered
into, such as adjustments following rent reviews. In 2022/2023, no contingent rents were receivable by the council (2021/2022 – nil). 
133

Page 134

74 
Note 18 Grant Income 
The council credited the following grants, contributions and donations to the Comprehensive Income and Expenditure Statement in
2022/2023: 
2022/23
£000
2021/22
£000
Credited to Taxation and Non Specific Grant Income  
Council Tax 148,958 143,472
Non Ring Fenced Government Grants 254,817 318,157
Non Domestic Rate Redistribution 422,591 319,312
Total 826,366 780,941   
Credited to Services  
Scottish Government  29,113 65,754
European Grant Funding 4,822 2,050
Skills Development Scotland 761 894
Central Government 65,055 66,715
Lottery 150 262
Creative Scotland 410 330
NHS (incl. Resource Transfer) 58,778 63,080
Other Grants 293 426
Total 159,382 199,511 
Note 19 Events After the Balance Sheet Date 
The unaudited Annual Accounts were authorised for approval by the Executive Director (Finance and Corporate Resources) on
27 June 2023. 
As noted in the Council’s Management Commentary, as of the 12 June, the position in relation to the back pay on Home Carers
Job Evaluation is now known.  A basis has been established for back-dating to October 2020.  The value of the back pay will
take some time to calculate, however these costs will require to be included in the financial position for 2022/2023. 
As the outcome of the back pay was only known as these Unaudited Accounts were being finalised, it has not been possible to
update the figures to reflect the outcome highlighted above, however, a Contingent Liability has been included (Note 31).  The
financial position will be updated for the Audited version of the Accounts.  
There were no other events that occurred between 1 April 2023 and the date that the unaudited Accounts were authorised for
issue, that would have an impact on the financial statements. 
Where events taking place before this date provided information about conditions existing at 31 March 2023, other than the Job
Evaluation of Home Carers, where the value of back pay has not yet been determined, the figures in the financial statements
and notes have been adjusted in all material respects to reflect the impact of this information. 
134

Page 135

75 
Note 20 Property, Plant and Equipment 
Movements on Balances 
Movements in 2022/2023:   
Council
Dwellings
£000 
Other
Land
And 
Buildings
£000 
Vehicles,
Plant
And
Equipment
£000 
Infrastructure
Assets
(Note 1)
£000 
Community
Assets
£000 
Surplus
Assets
£000 
Assets
Under
Construction
£000 
Total
Property,
Plant and
Equipment
£000
PFI assets
Included in
Property,
Plant and
Equipment
£000
Cost or Valuation 
As at 1 April 2022  1,490,806 1,844,497 51,341  3,704 10,899 35,725 3,436,972 506,916
Additions  45,841 5,636 7,538 20,158 85 (9) 36,089 115,338 612
Revaluation increases / (decreases)
recognised in the Revaluation Reserve 
(22,634) 26,896 1,308 - - (11) - 5,559 -
Revaluation increases / (decreases)
recognised in the Surplus / Deficit on the
Provision of Services 
- (3,377) (16) - - (21) (41) (3,455) -
De-recognition – Disposals  -
(915) (6,007) - - - - (6,922) -
Assets reclassified from Held for Sale 
- (10) - - - (669) - (679) -
Other movements in Cost or Valuation 
17,304 23,286 151 252 (2,315) 1 (38,678) 1 -
At 31 March 2023 
1,531,317 1,896,013 54,315  1,474 10,190 33,095 3,546,814 507,528
135

Page 136

76 
Council
Dwellings
£000 
Other
Land
And 
Buildings
£000 
Vehicles,
Plant
And
Equipment
£000 
Infrastructure
Assets
(Note 1)
£000 
Community
Assets
£000 
Surplus
Assets
£000 
Assets
Under
Construction
£000 
Total
Property,
Plant and
Equipment
£000
PFI assets
Included in
Property,
Plant and
Equipment
£000
Accumulated Depreciation and
Impairment 
- 74,641 16,782  65 8 - 91,496 22,268
As at 1 April 2022  37,777 36,889 8,753 14,241 13 9 - 97,682 9,413
Depreciation Charge  (37,777) (20,873) - - - - - (58,650) -
Depreciation written out to the
Revaluation Reserve 
- (5,407) (11) - - - - (5,418) -
Depreciation written out to the Surplus /
Deficit on the Provision of Services 
- - - - - - - - -
Impairment losses / (reversals)
recognised in the Revaluation Reserve 
- - - - - - - - -
Impairment losses / (reversals)
recognised in the Deficit on the
Provision of Services 
- - (6,007) - - - - (6,007) -
De-recognition – Disposals  - - - - - - - - -
Eliminated on reclassification to Assets
Held for Sale 
- 69 - - (69) - - - -
Other movements in Depreciation and
Impairment 
- - - - - - - - -
At 31 March 2023 
- 85,319 19,517  9 17 - 119,103 31,681 
Net book value 
At 31 March 2023  1,531,317 1,810,694 34,798 326,785 1,465 10,173 33,095 3,748,327 475,847
At 31 March 2022  1,490,806 1,769,856 34,559 320,616 3,639 10,891 35,725 3,666,092 484,648 
136

Page 137

77 
Movements on Balances
Movements in 2021/2022:   
Council
Dwellings
£000 
Other
Land
And 
Buildings
£000 
Vehicles,
Plant
And
Equipment
£000 
Infrastructure
Assets
(Note 1)
£000 
Community
Assets
£000 
Surplus
Assets
£000 
Assets
Under
Construction
£000 
Total
Property,
Plant and
Equipment
£000
PFI assets
Included in
Property,
Plant and
Equipment
£000
Cost or Valuation 
As at 1 April 2021  1,337,441 1,819,030 48,581  2,829 9,358 75,764 3,293,003 506,651
Additions  61,512 6,298 7,301 24,830 153 42 33,286 133,422 265
Revaluation increases / (decreases)
recognised in the Revaluation Reserve 
39,574 16,850 642 - 34 200 - 57,300 -
Revaluation increases / (decreases)
recognised in the Surplus / Deficit on the
Provision of Services 
- (13,571) - - 85 (275) - (13,761) -
De-recognition – Disposals  - (1,076) (5,865) - - (70) - (7,011) -
Assets reclassified from Held for Sale  - (57) - - - 19 - (38) -
Other movements in Cost or Valuation  52,279 17,023 682 1,113 603 1,625 (73,325) - -
At 31 March 2022  1,490,806 1,844,497 51,341  3,704 10,899 35,725 3,462,915 506,916 
137

Page 138

78 
Council
Dwellings
£000 
Other
Land
And 
Buildings
£000 
Vehicles,
Plant
And
Equipment
£000 
Infrastructure
Assets
(Note 1)
£000 
Community
Assets
£000 
Surplus
Assets
£000 
Assets
Under
Construction
£000 
Total
Property,
Plant and
Equipment
£000
PFI assets
Included in
Property,
Plant and
Equipment
£000
Accumulated Depreciation and
Impairment 
As at 1 April 2021  - 65,673 14,326  47 60  - 80,106 12,852
Depreciation Charge  35,353 35,820 8,646 13,655 18 15 - 93,507 9,416
Depreciation written out to the
Revaluation Reserve 
(35,353) (20,094) (325) - - (30) - (55,802) -
Depreciation written out to the Surplus /
Deficit on the Provision of Services 
- (5,951) - - - (37) - (5,988) -
Impairment losses / (reversals)
recognised in the Revaluation Reserve 
- - - - - - - - -
Impairment losses / (reversals)
recognised in the Deficit on the
Provision of Services 
- - - - - - - - -
De-recognition – Disposals  - (807) (5,865) - - - - (6,672) -
Eliminated on reclassification to Assets 
Held for Sale 
- - - - - - - - -
Other movements in Depreciation and
Impairment 
- - - - - - - - -
At 31 March 2022  - 74,641 16,782  65 8 - 105,151 22,268 
Net book value 
At 31 March 2022  1,490,806 1,769,856 34,559 320,616 3,639 10,891 35,725 3,666,092 484,648
At 31 March 2021  1,337,441 1,753,357 34,255 308,328 2,782 9,298 75,764 3,521,225 493,799
138

Page 139

79 
Note 1:
Infrastructure asset values have been disclosed in accordance with the Scottish Government’s Finance Circular 9/2022 Statutory
Override - Accounting for Infrastructure Assets. The council has applied both statutory overrides set out in the circular which are as
follows:
▪ For accounting periods commencing from 1 April 2021 until 31 March 2024, a local authority is not required to report the gross
carrying amount and accumulated depreciation for infrastructure assets.
▪ For the accounting periods from 1 April 2010 to 31 March 2024, the carrying amount to be derecognised in respect of a replaced
part of an infrastructure asset is to be accounted for as a nil amount, and no subsequent adjustment can be made to the carrying
amount of the asset with respect to that part. 
The approach is set out in Note 36: Accounting Policies. 
Capital Commitments
At 31 March 2023, the council has entered into a number of contracts for the construction or enhancement of Property, Plant
and Equipment for housing and non-housing projects in 2023/2024 and future years. The major commitments for both Housing
and General Services are as follows: 
Housing Projects £000  Non-Housing Projects £000     
New Build Housing
Housing Investment projects including Heating
Projects, Windows and Doors, Fire Doors,
External Fabric Upgrades, Roofing and
Environmental Works 
12,582
11,472 
City Deal - Greenhills Road/A726 Strathaven Road
Clyde Bridge
Chatelherault Allotments
Community Alarms
SWiS Plus Replacement
Education Information Computer Technology
Clyde Terrace (Bothwell Nursery) - New Build
Jackton PS – New Build
Castlefield Primary School - Extension
Council Headquarters - Switchgear Upgrade
Oracle Upgrade
Cambuslang Streetscape
200
5,912
280
669
791
2,700
2,815
3,865
424
325
3,536
179 
Revaluations
The council carries out a rolling programme that ensures that all Property, Plant and Equipment required to be measured
at fair value is revalued at least every five years. All valuations were carried out internally. Valuations of land and buildings
were carried out in accordance with the methodologies and bases for estimation set out in the professional standards of the
Royal Institution of Chartered Surveyors. Valuations of vehicles, plant and equipment are based on current prices where
there is an active second-hand market or latest list prices adjusted for the condition of the asset. 
Vehicles, plant and equipment, despite being valued in the Balance Sheet at current costs are not included in the five year
revaluation programme as any changes in valuation are considered to be immaterial. Council dwellings are revalued every year. 
The significant assumptions applied in estimating the fair values are:
■ All valuations are prepared in accordance with the current edition of the RICS Valuation Standards.
■ All valuations are provided by a Valuer directly employed by South Lanarkshire Council and are accordingly defined as
internal valuations. 
Valuation Assumptions 
Unless the Appointed Valuer is advised or reports to the contrary, the following valuation assumptions shall apply to all asset
valuations provided under this service:
■ It is assumed that the Local Authority shall continue to provide the services to which the assets relate;
■ It is assumed that the property valued, is not at the date of valuation, affected by any mining subsidence and will
not be affected in the future;
■ It is assumed that the site is stable and will not occasion any extraordinary costs with regard to mining subsidence;
■ It is assumed that the title to the subject contains no onerous burdens and restrictive conditions and that it has not
been ascertained what minerals, rights of support and compensation is attached to the land nor whether rights of
use and re-entry have been reserved;
■ It is assumed that the property and its value are unaffected by any matters which would be revealed by local
search and replies to the usual enquiries or by inspection of any register and that its condition, use, or intended
use was, is or will be lawful;
■ It is assumed that the property has the necessary statutory consents for the current buildings and use and that
there are no policies or proposals by statutory authorities that could impact positively or adversely on the value;
■ No investigation shall be undertaken or information provided regarding the use of hazardous or deleterious
materials or techniques in the construction of the property. It is assumed that no such materials or techniques
139

Page 140

80 
have been used;
■ No investigation shall be undertaken or information provided regarding the presence of contamination or
hazardous substances in the property (including the site) and neighbouring properties. It is assumed that no
such contamination or hazardous substances are present;
■ No environmental assessment shall be carried out or information provided on the presence of naturally occurring radon gas.
It is assumed that no radon gas is present in the property;
■ It is assumed that adequate repairs and maintenance is being undertaken; and
■ Unless otherwise stated, the date of valuation shall be 1 April of the specified financial year. 
Revaluation Programme 
The table below shows the progress of the council’s programme for the revaluation of Property, Plant and Equipment that
ensures that all its PPE assets required to be measured at fair value are revalued at least every five years. The measurement
basis used for determining the gross carrying amount, and the significant assumptions applied in estimating the fair values are
disclosed above and in Note 36 Accounting Policies under Section P ‘Property, Plant and Equipment’. 
Council
Dwellings
£000
Other
Land and
Buildings
£000
Vehicles,
Plant and
Equipment
£0000
Infrastructure
Assets
£000
Community 
Assets
£000
Surplus
Assets
£000
Assets
Under
Construction
£000
Total
£000
Carried at historical
cost
- - 34,798 326,785 1,465 - 33,095 396,143
Valued at fair value        
2021/22 1,531,317 328,765 - - - 328 - 1,860,410
2020/21 - 254,879 - - - 1,944 - 256,823
2019/20 - 432,594 - - - 5,537 - 438,131
2018/19 - 551,649 - - - 1,947 - 553,596
2017/18 - 242,375 - - - 417 - 242,792
5 years ago and
greater
- 432 - - - - - 432         
Total Cost or
Valuation
1,531,317 1,810,694 34,798  326,785 1,465 10,173 33,095 3,748,327 
Note 21 Other Assets – Intangible, Heritage and Assets Held For Sale 
Intangible
Assets
Intangible
Assets
Heritage
Assets
Heritage
Assets
Assets
Held for
Sale
Assets
Held for
Sale 
2022/23
£000
2021/22
£000
2022/23
£000
2021/22
£000
2022/23
£000
2021/22
£000
Cost or Valuation      
Balance at 1 April 361 399 3,826 3,826 213 618
Additions 18 97 - - 8,310 -
Revaluation increases / (decreases) recognised in
the Revaluation Reserve
- - - - - 76
Revaluation increases / (decreases) in the
Comprehensive Income and Expenditure Statement
- - - - - -
De-recognition – Disposals (4) (136) - - (5,794) (519)
Assets reclassified (to) / from Assets Held for Sale  - - - 679 38
Balance at 31 March 375 360 3,826 3,826 3,408 213       
Accumulated Depreciation      
Balance at 1 April 113 160 - - - -
Depreciation charge 75 81 - - - -
Depreciation written out to the Revaluation Reserve - - - - - -
Depreciation written out to the Surplus / Deficit on
Provision of Services
- - - - - -
Depreciation – Disposals (3) (128) - - - -
Elimination on reclassification to Assets Held for
Sale
- - - - - -
Balance at 31 March 185 113 - - - -       
Net Book Value at 31 March 190 247 3,826 3,826 3,408 213
140

Page 141

81 
Note 22 Capital Expenditure and Capital Financing 
The total amount of capital expenditure incurred in the year is shown in the table below (including the value of assets acquired
under finance leases and PFI/PPP contracts), together with the resources that have been used to finance it. Where capital
expenditure is to be financed in future years by charges to revenue as assets are used by the council, the expenditure results in an
increase in the Capital Financing Requirement (CFR), a measure of the capital expenditure incurred historically by the council that
has yet to be financed. The CFR is analysed in the second part of this note. 
General
Fund
2022/23
£000 
HRA
2022/23
£000 
Total
2022/23
£000
General
Fund
2021/22
£000 
HRA
2021/22
£000 
Total
2021/22
£000
Opening Capital Financing Requirement  1,015,606 282,854 1,298,460 1,015,264 249,720 1,264,984       
Capital Investment 
Property, Plant and Equipment 62,954 60,695 123,648 60,241 73,181 133,422
Intangible Assets 18 - 18 97 - 97
Decrease in PPP Finance Lease Liability (7,157) - (7,157) (7,453) - (7,453)
Impact of Applying Service Concession Flexibility 64,366 - 64,366 - - -       
Sources of Finance 
Capital Receipts - (8,027) (8,027) - (1,536) (1,536)
Government Grants and Other Contributions (43,056) (12,235) (55,291) (47,781) (12,066) (59,847)
Sums set aside from revenue:      
▪ Direct Revenue Contributions (874) (26,050) (26,924) (2,361) (19,637) (21,998)
▪ Loans Fund Principal (2,821) (4,531) (7,352) (2,401) (6,808) (9,209)
Closing Capital Financing Requirement 1,089,036 292,706 1,381,742 1,015,606 282,854 1,298,460       
Explanation of movements in year: 
Increase in Underlying Need to Borrow  19,042 14,383 33,425 10,196 39,942 50,138
Loans Fund Repayments  (2,821) (4,531) (7,352) (2,401) (6,808) (9,209)
Assets Acquired Under PFI/PPP Contracts  (7,157) - (7,157) (7,453) - (7,453)
Impact of Applying Service Concession Flexibility  64,366 - 64,366 - - -
Increase / (Decrease) in Capital Financing
Requirement
73,430 9,852 83,282 342 33,134 33,476 
141

Page 142

82 
Note 23 Short Term Debtors 
31 March
2023
£000 
31 March
2022
£000
Trade Receivables 33,754 41,326
Prepayments 6,804 4,521
Other Receivable Amounts 39,029 46,867 
Total  79,587  92,714 
Note 24 Debtors for Local Taxation 
The past due but not impaired amount for local taxation and non-domestic rates can be analysed by age as follows: 
31 March 2023
Council Tax
£000
31 March 2023
NDR
£000
31 March 2022
Council Tax
£000
31 March 2022
NDR
£000
Less than one year 507 2,310 2,257 3,134
One to two years 1,065 - 1,038 -
Two to five years - - - -
More than five years - - - - 
Total  1,572  2,310  3,295  3,134 
Note 25 Short Term Creditors 
31 March
2023
£000 
31 March
2022
£000
Trade Payables 87,821 68,048
Other Payables 126,127 122,665 
Total  213,948  190,713 
Note: Included within the Other Payables balance of £126.127m are balances held on behalf of third parties totalling £1.024m. They
relate to Lanarkshire Valuation Joint Board, Clyde Valley Learning and Development Joint Committee, SEEMIS LLP, Regen FX
Youth Trust, Supplier Development Programme, Common Good and Trust Funds whose financial transactions are hosted in the
Council’s Financial Management System. 
Note 26 Provisions 
Injury and
damage
compensation
claims
(1)
£000
Other provisions 
(2)
£000
Total 
£000
Balance at 31 March 2022 611 2,109 2,720
Additional provisions made in 2022/23 46 2,454 2,500
Amount used in 2022/23 (58) (2,209) (2,267)
Unused amounts reversed in 2022/23 - - -
Unwinding of discounting in 2022/23 - - -
Balance at 31 March 2023 599 2,353 2,952 
142

Page 143

83 
The above provisions can be further analysed into Short Term and Long Term as follows: 
Injury and
damage
compensation
claims
(1)
£000
Other provisions 
(2)
£000
Total 
£000
Short Term - 2,353 2,353
Long Term 599 - 599
Balance at 31 March 2023 599 2,353 2,952 
(1) The majority of this amount relates to a long-term provision in respect of ongoing compensation claims.  The council 
believes that the amount provided accurately represents the best estimate of the amounts due.
(2) The amount relates to provisions in respect of orders for bespoke adaptations, property dilapidations and COVID-19 
sustainability payments to social care providers. 
Note 27 Receipts in Advance 
The council has received a number of grants and contributions that have yet to be recognised as income. This is because
they have conditions attached to them which requires the monies or property to be returned to the giver if these conditions
are not met. These monies are committed to spend in 2023/2024.
The balances at 31 March 2023 are as follows: 
31 March
2023
£000
31 March
2024
£000
Revenue Grants and Contributions  
Big Lottery - 142
UK Government 72 -
Clyde Gateway 85 121
Visit Scotland 28 -
National Health Service 69 65
Scottish Coal 498 498
Scottish Government 333 1,788
Scottish Government - COVID-19 Business Support 6 3,264
Department of Works and Pensions 87 234
Wind Turbine Construction Compensation (Various) - 108
Home Office 140 110
Other 2 73
Total 1,320 6,403 
Note 28 Public Private Partnership and Similar Contracts
The Council has two PPP or similar contracts:  Secondary Schools PPP and Glasgow Southern Orbital.
Secondary Schools PPP:  The council entered the PPP agreement in June 2006 for the provision of 17 new build schools (which
includes 2 named Additional Support Needs schools) as well as the major refurbishment of Stonelaw High School and Hamilton
Grammar. The Unitary Charge is index linked with the inflation rate in the January of the preceding financial year used to agree
the charge for the new financial year. The agreement will last 30 years and will end in 2039/2040.
The unitary charge paid to the contractor includes the repayment of construction costs, interest and service charges and the
projected payments due under the agreement, based on assumed RPI of 2.5% per annum.
Glasgow Southern Orbital:  The council entered the PPP agreement in July 2006 for the Design, Build, Finance and Operate
Contract which covered both the Glasgow Southern Orbital and the M77 Extension with a contract value of £130m. The agreement
will last 30 years and will end in 2035/2036.
The actual payments made on PPP contracts are single sum unitary charge payments made to the contractor. For year-end
accounting purposes we are required to calculate notional figures. 
143

Page 144

84 
Payments remaining to be made under PFI contracts for both Schools and Glasgow Southern Orbital as at 31 March 2023
(assuming an inflation rate of 2.5% for Schools PPP and excluding any estimation of availability/ performance deductions) are as
follows:  
Payment
For Services
£000
Reimbursement
Of Capital
Expenditure
£000 
Interest
£000 
Contingent
Rents
£000 
Total
£000
Payable in 2023/24 14,917 7,098 9,430 9,416 40,861
Payable within two to five years 68,058 29,629 33,815 42,404 173,906
Payable within six to ten years 97,251 44,712 33,180 67,816 242,959
Payable within eleven to fifteen years 84,101 72,619 17,663 100,370 274,753
Payable within sixteen to twenty years 28,732 25,076 1,358 34,230 89,396
Total 293,059 179,134 95,446 254,326 821,965
The impact of a 1% movement in inflation on the 2023/2024 Unitary charge payment would be £0.398m.
The liability outstanding to pay the liability to the contractor for capital expenditure incurred is as follows: 
2022/23
£000
2021/22
£000
Balance outstanding at start of year 186,291 193,743
Payments during year (7,157) (7,453)
Capital expenditure incurred in the year 0 -
Reduction in liability for prepaid assets 0 -
Balance outstanding at year end 179,134 186,290 
Implementation of PPP Service Concession Flexibilities
In accordance with Accounting Policy S on page 106 and in line with Finance Circular 10/2022, the Council has implemented the
permitted PPP Service Concession flexibility in financial year 2022/2023 on a retrospective annuity basis with a useful life of 50 years.
The flexibility being applied is consistent with current Council Loans Fund arrangements and is considered prudent, sustainable, and
affordable over the life of the asset.  The implementation of this arrangement has no impact on the payments made to the contractor.
The current notional repayments noted above have been compared against an annuity repayment profile based on the estimated useful
asset lives for the each of the two PP or similar arrangements, over the contract period. The most appropriate asset life is considered to
be 50 years which replicates the useful asset life of other similar type assets held on the Council’s balance sheet (schools and roads). 
By applying the flexibility, a one-off combined retrospective saving of £59,733m as detailed in the table below will be achieved. 
PPP debt repayment Current
repayment
£000
Revised
repayment
£000
Benefit / 
(Cost)
£000
Pre 2022/2023 85,284 25,551 59,733
Paid in 2022/2023 7,157 2,524 4,633
Payable within two to five years 29,680 11,530 18,150
Payable within six to ten years 40,293 18,264 22,029
Payable within eleven to fifteen years 68,919 23,733 45,186
Payable within sixteen to twenty years 40,242 30,839 9,403
Payable within twenty-one to twenty-five years 0 40,029 (40,029)
Payable within twenty-six to forty years 0 51,801 (51,801)
Payable within forty-one to forty-five years 0 67,302 (67,302)
Total 271,575 271,575 - 
In addition to the one-off retrospective element, an in-year saving has been realised in the scheduled debt repayments in 2022/2023, of
£4.633m.  This will be followed by a reduction in the annual charges for further 17 years and then the continuation of the statutory charges
144

Page 145

85 
after the PPP and similar contracts have been repaid. Over the full asset life of the arrangement, the total repayment for the debt liability
remains the same.  
Impact on the Income and Expenditure Statement, the Balance Sheet and the Movement in Reserves
The reprofiling of the debt liability repayments increases the Capital Financing Requirement by £59.733m as at 1 April 2022. The increase
in the Capital Financing Reserve will continue to be reduced by the revised repayments after each PPP or similar contract has expired
until the end of the revised period. Being a cumulative statutory adjustment there is no prior year restatement of statutory adjustments in
the Annual Accounts. The statutory adjustment up to 31 March 2023 has the following impact on the 2022/2023 Balance Sheet (Capital
Adjustment Account) and Movement in Reserves statement: 
Increase /
(Decrease)
£000
Increase /
(Decrease)
£000
£000
Capital Adjustment Account (Note 13) (59,733) (4,633) (64,366)
Movement in Reserves Statement (Page 51) 59,733 4,633 64,366 
Note 29 Pension Schemes Accounted for as Defined Contribution Schemes 
Teachers employed by the council are members of the Teachers’ Pension Scheme, administered by the Scottish Government.
The Scheme provides teachers with specified benefits upon their retirement, and the council contributes towards the costs by
making contributions based on a percentage of members’ pensionable salaries. 
The Scheme is technically a defined benefit scheme.  However, the Scheme is unfunded and the Scottish Government uses a
notional fund as the basis for calculating the employers’ contribution rate paid by local authorities. The council is not able to
identify its share of underlying financial position and performance of the Scheme with sufficient reliability for accounting purposes.
For the purposes of the Financial Statements, it is therefore accounted for on the same basis as a defined contribution scheme. 
As a proportion of the total contributions into the Teachers’ Pension Scheme during the year ending 31 March 2023, the council’s
own contributions equate to approximately 5.82%. 
In 2022/2023, the council paid £38.864 million to Teachers’ Pensions in respect of teachers’ retirement benefits, representing
23.0% of pensionable pay. The figures for 2021/2022 were £36.457 million and 23.0% of pensionable pay. 
The council is responsible for the costs of any additional benefits awarded upon early retirement outside of the terms of the
teachers’ scheme. These costs are accounted for on a defined benefit basis and detailed in Note 30. 
Note 30 Pension Schemes Accounted for as Defined Benefit Schemes 
Participation in Pension Schemes 
The post-employment scheme for employees other than teachers is the Local Government Pension Scheme (LGPS) and is
administered in the West of Scotland by Glasgow City Council in respect of all local authorities and admitted bodies in the former
Strathclyde area. This is a multi-employer scheme in which it is possible for an employer to identify its share of the assets and liabilities
on a consistent and reasonable basis. Employer’s liabilities can be evaluated directly by the Actuary at any time on membership data.
Individual employer assets have been apportioned to each employer since 2002. Prior to that date, each employer was considered to
have the same funding as the whole Fund. 
Benefits
■ It is a defined benefit final salary scheme, meaning that the council and employees pay contributions into a fund,
calculated at a level to balance the pensions liability with investment assets.
■ A new Career Average Related Earnings (CARE) pension scheme has been introduced from 1 April 2015. The
pension accrual rate guarantees a pension that is built up at a rate of 1/49th of the pensionable pay in the
financial year. The amount built up in the year is transferred to the member’s pension account and at the end of
each financial year the total in the member’s pension account is adjusted in line with the cost of living to ensure it
retains its purchasing power.
■ For pension contributions from 2009 to 2015, the pension is based on 1/60th of final pensionable salary and
years of service, and prior to 2009, the accrual rate guarantees a pension based on 1/80th and a lump sum
145

Page 146

86 
based on 3/80th of final pensionable pay and years of pensionable service.
■ There is no automatic entitlement to a lump sum. Members may opt to give up (commute) pension for lump
sum up to the limits set by the Finance Act 2004. The scheme’s retirement age is the normal age for the state
pension. Pensions are increased annually in line with changes to the Pensions (Increase) Act 1971 and
Section 59 of the Social Security Pensions Act 1975. 
Governance
■ The Strathclyde Pension Fund is operated under the regulatory framework for the LGPS in Scotland and the
governance of the scheme is the responsibility of the Strathclyde Pension Fund Committee. This committee is
comprised solely of Elected Members of Glasgow City Council. Employing authorities (including South Lanarkshire
Council) are represented at the Strathclyde Pension Fund Representative Forum.
■ Policy is determined in accordance with the Local Government Pension Scheme (Scotland) Regulations.
Management of the Fund’s investments is carried out by the Fund’s Investment Advisory Panel which selects
and appoints a number of external investment managers/partners and monitors their investment performance.
■ Under the Regulations, employers fall into three categories, scheme employers (also known as schedule
bodies) such as South Lanarkshire Council, community admission bodies and transferee admission bodies.
Admission agreements are generally assumed to be open-ended. However, either party can voluntarily
terminate the admission agreement by giving an appropriate period of notice to the other parties. Any deficit
arising from the cessation valuation will usually be levied on the departing admission body as a capital
payment. 
Principal Risks
■ The principal risks to the scheme are the longevity assumptions, statutory changes to the scheme, changes to
inflation, bond yields and the performance of the investments held by the scheme. These are mitigated to a
certain extent by the statutory requirements to charge the General Fund the amount due by statute as described
in the accounting policy note. 
Discretionary Post-employment Benefits
■ Discretionary post-retirement benefits on early retirement are an unfunded defined benefit arrangement, under
which liabilities are recognised when an award is made. There are no plan assets built up to meet these pension
liabilities. 
Age Discrimination (McCloud) and Guaranteed Minimum Pension 
McCloud Ruling – Age Discrimination
When the Local Government Pension Scheme (LGPS) Scotland benefit structure was reformed in 2015, transitional protections were
applied to certain older members close to retirement age. The benefits accrued from 1 April 2015 by these members are subject to an
‘underpin’ which means that they cannot be lower than what they would have received under the previous benefit structure.
In December 2018, the Court of Appeal upheld a ruling (McCloud case) that similar transitional protections were unlawful on the
grounds of age discrimination. This means that the LGPS Scotland benefits accrued from 2015 may need to be enhanced so that all
eligible members, regardless of age, will benefit from the underpin. The impact of this will depend on the compensation awarded,
members’ future salary increases, length of service, retirement age and whether (when) members withdraw from active service.
In 2019, Strathclyde Pension Fund’s actuary included an estimate of the impact of this in their IAS19 reports and the Pension Liability
reported in the council’s Balance Sheet.  In July 2020, the Government published a consultation covering Scotland which proposed
amendments to the Local Government Pension Scheme in order to provide a remedy for the McCloud and Sargeant legal rulings and
actuaries reviewed their assumptions in the IAS19 reports. The actuary has made no further explicit adjustments to the obligation /
current service costs for 2022/2023, nor for the projected service cost for 2023/2024. 
Guaranteed Minimum Pension
Indexation Treatment (Lloyd’s Ruling) 
Guaranteed Minimum Pension (GMP) was accrued by members of the Local Government Pension Scheme (LGPS) between 6 April
1978 and 5 April 1997. Although the value of GMP was inherently unequal between males and females due to a number of factors, the
overall equality of benefits was achieved through the interaction between scheme pensions and the Second State Pension. The
introduction of the new Single State Pension in April 2016 disrupted this arrangement, bringing uncertainty over the ongoing indexation
of GMP’s which could lead to inequalities between men and women’s benefits.
An interim solution passed the responsibility for ensuring GMP’s kept pace with inflation to pension schemes themselves for members
reaching state pension age between 6 April 2016 and 5 April 2021. This leads to increased costs for schemes including the LGPS and
146

Page 147

87 
scheme employers. The Strathclyde Pension Fund’s actuary has carried out calculations to estimate the impact, assuming that the
interim solution will be applied to all members retiring from 6 April 2016 onwards. The value of the full impact of GMP has been
included in the pension liability reported in the council’s Balance Sheet. These figures will be updated as part of the Pension Fund
valuations and as more information becomes available.
Historical Transfers (Further Lloyd’s Ruling)
A further ruling was passed in relation to historical transfers and it is the opinion of Strathclyde Pension Fund’s actuary that this is
unlikely to have a significant impact on the pension obligations of a typical employer.  In addition, the historic individual member data to
assess the impact is not readily available, therefore no allowance has been made in the calculations.
Goodwin
Scottish Public Pension Agency circular (Local Government Pension Scheme 2020/04), refers to a ruling that same-sex survivors were
originally entitled to survivor benefits, taking into account the member’s service from 6 April 1978. Following the Goodwin Tribunal,
regulatory amendments will now need to be made with effect from the same date to extend that entitlement to male spouse survivors of
female members. 
Previously, the male spouse survivor’s entitlement was based on service accrued from 6 April 1988. The change is backdated to 5
December 2005, therefore affects the pension of male spouse survivors where their entitlement arose on or after 5 December 2005. 
While there is still uncertainty surrounding the potential remedy to the Goodwin judgement, Strathclyde Pension Fund’s actuary has
carried out analysis in order to understand the potential impact of implementing a solution to correct the past underpayment of
spouses’ benefits and have ascertained that they feel the impact is very small for a typical fund (c0.1 to 0.2% of obligations), therefore
no allowance has currently been made in the calculations. 
Other Cases (Walker and O’Brien)
The actuary has also highlighted 2 other court cases which may impact on Local Government Pension Scheme benefits in the future.
The first was the Walker case where it was ruled that surviving spouses in same sex marriages should be entitled to the same benefits
as those in different sex marriages and also the O’Brien case where it was ruled that recognition of part time benefits should apply to
service for the period prior to 7 April 2000.  
The Actuary’s view remains unchanged from previous years and is that they are unlikely to be significant judgements in terms of
impact on pension obligations.  Until further guidance is released from the relevant governing bodies in the LGPS, no allowance has
been made for the potential remedies for these judgements.
Transactions Relating to Post-Employment Benefits 
The cost of retirement benefits is recognised in the reported Cost of Services when they are earned by the council’s employees, rather
than when the benefits are eventually paid as pensions. However, the charge that is statutorily required to be made against the Council
Tax is based upon the pension contributions payable by the council in the year, and an adjustment is made in the Movement in
Reserves Statement to achieve this. 
The following transactions have been made in the accounting statements in 2022/2023 and the prior year 2021/2022. 
147

Page 148

88 
31 March
2023
£000
31 March
2022
£000
Comprehensive Income and Expenditure Statement (CIES)  
Cost of Services:  
Service cost comprising:  
• current service cost 125,747 130,393
• past service costs - -
• unfunded benefits - -   
Financing and Investment Income and Expenditure  
• net interest expense 5,193 9,586   
Total Post Employment Benefit Charged to the Surplus or Deficit on the Provision of
Services
130,940 139,979   
Other Benefits Charged to the CIES   
Re-measurement of the net defined liability comprising:  
• Expected return on pension fund assets 115,915 (142,924)
• Actuarial (gains) or losses arising on changes in demographic assumptions (21,885) (17,819)
• Actuarial (gains) or losses arising on changes in financial assumptions (1,135,272) (207,634)
• Actuarial (gains) or losses arising on changes in other experiences 132,981 3,335
• Actuarial (gains) or losses arising on de-recognition of Pension Asset 625,672 -
Total Post Employment Benefit Charged to the CIES (151,649) (225,063)   
Net charge to the Surplus / Deficit on the Provision of Services brought forward 130,940 139,979   
Movement in Reserves Statement (MIRS)     
• Reversal of net charges made to the Surplus or Deficit on the Provision of Services for
post-employment benefits in accordance with the Code
(69,383) (82,414)   
Actual amount charged against the General Fund balance for pensions in the year:  
Employers’ contributions payable to Strathclyde Pension Fund 61,557 57,565 
Pensions Assets and Liabilities Recognised in the Balance Sheet 
The amount included in the Balance Sheet arising from the council’s obligation in respect of its defined benefit plan is as
follows: 
31 March
2023
£000
31 March
2022
£000
Present Value of the Defined Benefit Obligation* (1,998,089) (2,870,632)
Fair Value of Pension Fund Assets 2,676,522 2,710,187
De-Recognition of Pension Fund Assets (Surplus) to Asset Ceiling (625,672) -
Net Liability arising from Defined Benefit Obligation 52,761 (160,445)   
*Unfunded liabilities included in the figure for present value of liabilities  
• unfunded liabilities for Pension Fund (43,039) (53,622)
• teachers’ unfunded pensions (60,483) (73,413)
• unfunded liabilities prior to 1996 local government reorganisation (11,799) (13,966) 
A reconciliation of South Lanarkshire Council’s share of the present value of Strathclyde Pension Fund’s defined benefit obligation
(liability) is as follows: 
148

Page 149

89 
31 March
2023
£000
31 March
2022
£000
Opening balance at 1 April (2,870,632) (2,952,854)
Current service cost (125,747) (130,393)
Interest cost (78,488) (59,853)
Contributions by Pension Fund participants (16,520) (15,392)
Re-measurement gains and (losses)  
• Actuarial gains and losses arising on changes in demographic assumptions 21,885 17,819
• Actuarial gains and losses arising on changes in financial assumptions 1,135,272 207,634
• Actuarial losses arising on changes in other experiences (132,981) (3,335)
Past service costs (including curtailment) - -
Settlements - -
Benefits paid 69,122 65,742
Closing balance at 31 March (1,998,089) (2,870,632) 
A reconciliation of South Lanarkshire Council’s share of the fair value of Strathclyde Pension Fund’s assets is as follows: 
31 March
2023
£000
31 March
2022
£000
Opening fair value of pension fund assets 2,710,187 2,509,781
Interest Income 73,295 50,267
Re-measurement gains and (losses)  
• Expected rate of return on pension fund assets (134,895) 142,924
• Actuarial gains and (losses) - -
• Actuarial losses arising on changes in other experiences - -
The effect of changes in foreign exchange rates - -
Contributions from employers 61,557 57,565
Contributions from employees into the scheme 16,520 15,392
Benefits paid (69,122) (65,742)
Closing balance at 31 March 2,657,542 2,710,187 
Analysis of Pension Fund’s Assets 
31 March 2023 31 March 2022 
Quoted
Prices in
Active
Markets
£000
Prices not
quoted in
Active
Markets
£000 
Total
£000
Quoted
Prices in
Active
Markets
£000
Prices not
quoted in
Active
Markets
£000 
Total
£000
Cash and cash equivalents 36,755 13,590 50,345 68,047 914 68,961
Equity Instruments 518,954 4,763 523,717 595,879 1,289 597,168
Debt Instruments - 1 1 - 1 1
Real Estate - 219,133 219,113 - 228,560 228,560
Derivatives - (2) (2) - - -
Private Equity - 653,193 653,193 - 530,556 530,556
Investment Funds 11,447 1,199,728 1,211,175 15,035 1,269,906 1,284,941
Total Assets 567,156 2,090,386 2,657,542 678,961 2,031,226 2,710,187 
Basis for Estimating Assets and Liabilities
The council’s share of the net obligations of the Strathclyde Pension Fund is an estimated figure based on actuarial
assumptions about the future and is a snapshot at the end of the financial year. The net obligation has been
assessed using the “projected unit method”, that estimates the pensions that will be payable in future years
dependent upon assumptions about mortality rates, salary levels and so on.
The Fund’s obligation has been assessed by Hymans Robertson, an independent firm of actuaries, and the estimates
are based on the latest full valuation of the Fund at 31 March 2020. The significant assumptions used by the actuary
are shown in the table below. Note 2 includes a sensitivity analysis for the pension obligation based on reasonably
possible changes of these assumptions occurring at the reporting date. 
149

Page 150

90 
31 March
2023
£000
31 March
2022
£000
Long term expected rate of return on assets in the Fund  
• Equity investment 2.30% 7.10%
• Bonds 2.30% 7.10%
• Property 2.30% 7.10%
• Cash 2.30% 7.10%   
Mortality Assumptions (years):  
• Men 19.3 19.6
• Women 22.2 22.4   
Longevity at 65 for future pensioners (years):  
• Men 20.5 21.0
• Women 24.2 24.5   
Rate of inflation 2.95% 3.20%
Rate of increase in salaries 3.65% 3.90%
Rate of increase in pensions 2.95% 3.20%
Rate for discounting Fund liabilities 4.75% 2.70%   
Take-up option to convert annual pension into retirement lump sum  
- Pre April 2009 service 50.0% 50.0%
- Post April 2009 service 75.0% 75.0%   
Asset and Liability Matching (ALM) Strategy
The main fund (Fund 1) of Strathclyde Pension Fund does not have an asset and liability matching strategy [ALM] as this is
used mainly by mature funds. The Fund does match, to the extent possible, the types of assets invested to the liabilities in the
defined benefit obligation. As is required by the pensions and investment regulations, the suitability of various types of
investment has been considered, as has the need to diversify investments to reduce the risk of being invested in too narrow a
range. The Fund invests in equities, bonds, properties and in cash.
Impact of High Inflationary Environment
The Fund’s actuary had advised that the CARE, deferred pensioner and pensioner obligations are increased each April in line
with previous September rate of CPI, and the April 2023 Pension Increase Order of 10.1% has been applied to the obligations
within the 31 March 2023 closing Balance Sheet figures.   
Accounting standards narrowly prescribe how the inflation assumption should be derived from market information at the year-
end date.  Therefore the current period of high inflation is somewhat allowed for insofar as it is captured in long-term market
expectations (at 31 March 2023).  However, the assumptions have been adjusted to recognise that the 2024 Pension Order is
currently expected to be higher than the single CPI assumption for accounting purposes.   
Recognition of Surplus (Net Asset)
The Accounting Standard (IFRIC 14) imposes a limit on the maximum amount of surplus (Asset) which can be recognised on
the Employer’s Balance Sheet.  This limit depends on factors unique to each employer.  The council requested further
information from the Fund’s actuary, to establish this limit and the total Asset advised by the actuary has been de-recognised
to match this limit (asset ceiling). 
Impact on the Authority’s Cash Flow
The objectives of the Fund are to keep employers’ contributions at as constant a rate as possible. The Fund has agreed a
strategy to achieve a funding rate of 100% in the longer term. The Scheme is a multi-employer defined benefit plan and
employers’ contributions have been determined so that employee and employer rates are standard across all
participating Local Authorities.  Employer’s contributions have been set at 19.3% for 2022/2023. Following the completion of
the triennial valuation as at 31 March 2020, employers’ contribution rates have been set at 19.3% for the three years
(2021/2022 to 2023/2024). The next triennial valuation of the Fund took place as at 31 March 2023, however any impact
on contribution rates beyond 2023/2024 has not yet been advised to councils.
The Fund will need to take account of impending national changes to the Local Government Pension Scheme in Scotland such
as the move from 1 April 2015 to a new career average revalued earning scheme (CARE) for future accruals.
The total contributions expected to be made by the council to Strathclyde Pension Fund in the year to 31 March 2024 is £53.456
million.
The assumed weighted average duration of the defined benefit obligation for scheme members is 19.0 years.
150

Page 151

91 
Note 31 Contingent Assets and Liabilities 
As at 31 March 2023 the council has the following material contingent liabilities: 
Historical Childhood Abuse 
The council recognises the potential for compensation claims deriving from the Scottish Government’s Limitation (Childhood Abuse)
Scotland Act 2017.  At this stage the extent of the council’s potential liability is unknown.  The Government introduced a Redress
Scheme in December 2021.  This may have an impact on the extent of the Council’s liability. This cannot be quantified. 
European Structural Funds 
The Council delivers projects which form part of the European Structural and Investment Funds Scotland Programme. Payments to
councils and other Lead Partners from the European Social Fund (ESF) were subject to a full suspension by the European
Commission (EC).  The EC has however now indicated it will lift its suspension of the ESF Scotland Programme.  As has been the
case throughout the period of suspension, there is no reason to believe that there will be any impact on the amount of funds that the
council will receive.
Pensions 
A circular from the Scottish Public Pensions Agency (Local Government Pension Scheme 2020/04) refers to a ruling that same-sex
survivors were originally entitled to survivor benefits, taking into account the member’s service from 6 April 1978.  Previously, the male
spouse survivor’s entitlement was based on service accrued from 6 April 1988. The change is backdated to 5 December 2005,
therefore affects the pension of male spouse survivors where their entitlement arose on or after 5 December 2005. Following the
Goodwin Tribunal, regulatory amendments will now need to be made with effect from the same date to extend that entitlement to male
survivors of female members.
While this could have a financial impact on future years’ costs, and the impact cannot yet be quantified, current information from the
Strathclyde Pension Fund actuary suggests that this is likely to be minimal. Given the uncertainty, and the immaterial nature of any
potential impact, no provision has been made in the Accounts. 
In addition, the actuary also highlighted an awareness of 2 other court cases which may impact on pension benefits in the future.  The
first was the Walker case where it was ruled that surviving spouses in same sex marriages should be entitled to the same benefits as
those in different sex marriages and also the O’Brien case where it was ruled that recognition of part time benefits should apply to
service for the period prior to 7 April 2000. The actuary’s understanding is that these are unlikely to be significant judgements in terms
of impact on future pension obligations of Employers.  Again, given the uncertainty, and the immaterial nature of any potential impact,
no provision has been made in the Accounts.
Job Evaluation Scheme
As part of the Council’s Job Evaluation Scheme, a range of posts have been identified as requiring review. Where there is no outcome
agreed, any liability in respect of these reviews cannot be determined. 
As part of an outcome of a job evaluation for Home Carers, a review is underway with regards to backpay.  As the review is ongoing at
the timing of completing these Accounts, any liability in respect of this review is uncertain and cannot be determined with accuracy at
this stage.  This is prior to the update as reported in page 74.
Contractor Claims
There is an ongoing arbitration and adjudication process surrounding a significant road construction project.  At this stage there is no
agreement on any element of the arbitration and therefore no potential liability can be determined. 
151

Page 152

92 
Note 32 Financial Instruments 
Categories of Financial Instruments 
The following categories of financial instrument are carried in the Balance Sheet: 
31 March 2023 31 March 2022 
Long Term
£000
Current
£000
Total
£000
Long Term
£000
Current
£000
Total
£000 
Financial Assets      
Fair value through profit and loss - - - - - -
Amortised Cost - 161,559 161,559 - 132,429 132,429       
Total Financial Assets  -  161,559  161,559  -  132,429  132,429       
Financial Liabilities      
Fair value through profit and loss - - - - - -
Amortised cost 1,186,567 38,209 1,224,776 1,128,735 59,616 1,188,351       
Total Financial Liabilities  1,186,567  38,209  1,224,776  1,128,735  59,616  1,188,351
152

Page 153

93 
Income, Expense, Gains and Losses 
2022/23 2021/22  
Surplus or
Deficit on the
Provision of
Services
£000
Other
Comprehensive
Income and
Expenditure
£000 
Total
£000 
Surplus or
Deficit on the
Provision of
Services
£000
Other
Comprehensive
Income and
Expenditure
£000 
Total
£000
Net Gains/Losses on:      
Financial Assets Measured at Fair Value 
Through Profit and Loss
- - - - - -
Financial Assets Measured at Amortised Cost - - - - - -
Investments in Equity Instruments Designated at Fair
Value Through Other Comprehensive Income
- - - - - -
Financial Assets Measured at Fair Value Through Other
Comprehensive Income
- - - - - -
Financial Liabilities Measured at Amortised Cost  - - - - - -
Total Net Gains/Losses - - - - - -       
Interest Revenue      
Financial Assets Measured at Amortised Cost 4,716 -  104 - 104
Other Financial Assets Measured at Fair Value Through
Other Comprehensive Income
- - - - - -
Total Interest Revenue 4,716 - - 104 - 104       
Interest Expense (39,644) - (39,644) (38,407) - (38,407)       
Fee Income      
Financial Assets or Financial Liabilities that are not at
Fair Value Through Profit and Loss
- - - - - -
Trust and Other Fiduciary Activities - - - - - -
Total Fee Income - - - - - -       
Fee Expense      
Financial Assets or Financial Liabilities that are not at
Fair Value Through Profit and Loss
- - - - - -
Trust and Other Fiduciary Activities - - - - - -
Total Fee Expense - - - - - -
153

Page 154

94 
Fair Value of Financial Assets
There are no financial assets held at fair value.
Transfers Between Levels of the Fair Value Hierarchy
There were no transfers between input levels 1 and 2 during the year.
Changes in the Valuation Technique
There has been no change in the valuation technique used during the year for the financial instruments. 
The Fair Values of Financial Assets and Financial Liabilities that are not Measured at Fair Value (but for which Fair Value
Disclosures are Required)
All financial assets and liabilities held by the authority are carried in the Balance Sheet at amortised cost. Their fair
value can be assessed by calculating the present value of the cash flows that take place over the remaining life of the
instruments, using the following assumptions:
■ For loans from the Public Works Loans Board (PWLB), premature repayment rates from the PWLB have
been applied to provide the fair value under PWLB debt redemption procedures.
■ For non PWLB loans, premature repayment rates from the PWLB have been applied to provide the fair value
under PWLB debt redemption procedures.
■ Where an instrument has a maturity of less than 12 months the fair value is taken to be the principal
outstanding.
The fair values calculated are as follows: 
2022/23 2022/23 2021/22 2021/22 
Carrying
Amount
£000 
Fair Value
£000
Carrying
Amount
£000 
Fair Value
£000
Financial Liabilities    
Financial Liabilities held at amortised cost: PWLB Debt 1,037,067 1,100,503 993,486 1,335,291
Financial Liabilities held at amortised cost: Non PWLB Debt 8,575 9,388 8,575 10,618
PFI and Finance Lease Liabilities 179,134 208,256 186,290 256,394
Total Financial Liabilities 1,224,776 1,318,147 1,188,351 1,602,303     
Financial Assets    
Financial Assets held at amortised cost 161,559 161,599 132,429 132,429
Total Financial Assets 161,559 161,599 132,429 132,429 
The fair value of the liabilities is greater than the carrying amount because the Council’s portfolio of loans includes a number of
fixed rate loans where the interest rate payable is higher than the rates available for similar loans in the market at the balance
sheet date.  This shows a notional future loss (based on economic conditions at 31 March 2023) arising from a commitment to
pay interest to lenders above current market rates.
The fair value of Public Works Loan Board (PWLB) loans of £1,100.503m measures the economic effect of the terms agreed
with the PWLB compared with estimates of the terms that would be offered for market transactions undertaken at the Balance
Sheet date, which has been assumed as the PWLB redemption interest rates. The difference between the carrying amount and
the fair value measures the additional interest that the Council will pay over the remaining terms of the loans under the
agreements with the PWLB, against what would be paid if the loans were at prevailing market rates.
However, the authority has a continuing ability to borrow at concessionary rates from the PWLB rather than from the markets,
termed the PWLB Certainty interest rates. A supplementary measure of the fair value as a result of its PWLB commitments for
fixed rate loans is to compare the terms of these loans with the new borrowing rates available from the PWLB. If a value is
calculated on this basis, the carrying amount of £1,037.068m would be valued at £1,012.212m. But, if the authority were to seek
to avoid the projected loss by repaying the loans to the PWLB, the PWLB would raise a penalty charge, based on the
redemption interest rates, for early redemption of £63.384m for the additional interest that will not now be paid. The exit price for
the PWLB loans including the penalty charge would be £1,100.452m.
154

Page 155

95 
Fair Value Hierarchy for Financial Assets and Financial Liabilities that are not Measured at Fair Value as
at 31 March 2023: 
Recurring fair value measurements using:
Quoted
Prices in
Active
Markets for
Identical
Assets
(Level 1)
£000 
Other
Significant
Observable
Inputs
(Level 2)
£000 
Significant
Unobservable
Inputs
(Level 3)
£000 
Total
£000
Financial Liabilities    
Financial Liabilities held at amortised cost: PWLB Debt - 1,100,503  - 1,100,503
Financial Liabilities held at amortised cost: Non PWLB Debt - 9,388  9,388
PFI and Finance Lease Liabilities - 208,256  208,256     
Financial Assets    
Financial Assets held at amortised cost 161,559   161,559
Total Assets / Liabilities 161,559 1,318,147 - 1,479,706 
Fair Value Hierarchy for Financial Assets and Financial Liabilities that are not Measured at Fair Value as
at 31 March 2022: 
Recurring fair value measurements using:
Quoted
Prices in
Active
Markets for
Identical
Assets
(Level 1)
£000 
Other
Significant
Observable
Inputs
(Level 2)
£000 
Significant
Unobservable
Inputs
(Level 3)
£000 
Total
£000
Financial Liabilities    
Financial Liabilities held at amortised cost: PWLB Debt - 1,335,291 - 1,335,291
Financial Liabilities held at amortised cost: Non PWLB Debt - 10,618 - 10,618
PFI and Finance Lease Liabilities - 256,394 - 256,394 
- 1,602,303 - 1,602,303     
Financial Assets    
Financial Assets held at amortised cost 132,429 - - 132,429
Total Assets / Liabilities 132,429 1,602,303 - 1,734,732 
Note 33 Disclosure of Nature and Extent of Risks Arising From Financial Instruments 
Key Risks 
The council’s activities expose it to a variety of financial risks:
■ Credit Risk – the possibility that other parties might fail to pay amounts due to the council
■ Liquidity Risk – the possibility that the council might not have funds available to meet its commitments to make
payments
■ Refinancing Risk – the possibility that the council might be required to renew a financial instrument on maturity at
disadvantageous interest rates or terms
■ Market Risk – the possibility that financial loss might arise for the council as a result of changes in such measures as
interest rates or stock market movements.
155

Page 156

96 
Overall Procedures for Managing Risk 
The procedures for risk management are set out through a legal framework set out in the Local Government (Scotland) Act 2003
and the associated regulations. These require the council to comply with the CIPFA Prudential Code and the CIPFA Treasury
Management in the Public Services Code of Practice. Overall these procedures require the Council to manage risk in the following
ways:
■ by approving an investment strategy for the forthcoming year setting out its criteria for both investing and
selecting investment counterparties;
■ by formally adopting the requirements of the Code of Practice;
■ by approving annually in advance prudential indicators for the following three years limiting:
▪ The council’s overall borrowing
▪ Its maximum and minimum exposures to fixed and variable rates
▪ Its maximum and minimum exposures of the maturity structure of its debt
▪ Its maximum annual exposures to investments maturing beyond a year
These are required to be reported and approved at, or before, the council’s annual Council Tax budget setting. These items are
reported within the Annual Treasury Management Strategy which outlines the detailed approach to managing risk in relation to the
council’s financial instrument exposure. Actual performance is also reported quarterly to Members.
These polices are implemented by a central treasury team. The council maintains written principles for overall risk management,
as well as written policies covering specific areas, such as interest rate risk, credit risk, and the investment of surplus cash
through Treasury Management Practices (TMPs). 
Nature and Extent of Risks – Credit Risk 
Credit Risk 
Credit Risk arises from deposits with banks and financial institutions, as well as credit exposures to the council’s customers
The council manages this risk by ensuring that investments are placed with the Debt Management Office, other local authorities or
Banks and Building Societies having sufficiently high credit worthiness as set out in the Treasury Management Strategy.
The table below summarises the nominal value of the Council’s investment portfolio at the end of 31 March 2022 into the relative
credit ratings. 
Balance Invested as at 31 March 2023 
Counterparty/Country 
Long
Term
Rating
(Fitch) 
Up to 1
month
£000
Greater
than 1
month
and up
to 3
months
£000
Greater
than 3
months
and up
to 6
months
£000
Greater
than 6
months
and up
to 9
months
£000
Greater
than 9
months
and up
to 12
months
£000 
Greater
than 12
months
£000 
Total
£000
Debt Management Office AA- 45,792 - - - - - 45,792
Total UK Government  45,792 - - - - - 45,792         
Local Authorities AA- 40,087 50,253 20,221 5,064 - - 115,625
Total UK Local Authorities  40,087 50,253 20,221 5,064 - - 115,625         
Bank of Scotland A+ - - - - - - -
The Royal Bank of Scotland A+ 142 - - - - - 142
Total UK Banks  142 - - - - - 142         
Total  86,021 50,253 20,221 5,064 - - 161,559
The Ratings are as at 31 March 2023 and are intended to provide an indication of credit risk. These are not necessarily the ratings
of institutions at the time deposits were placed.
The Ratings above are from Fitch ratings. The Long-Term Rating is the benchmark measure of probability of default.
156

Page 157

97 
Amounts Arising from Expected Credit Losses 
The council’s investments have been assessed and it has been concluded that the expected credit loss is not material and therefore no
allowances have been made.
The following analysis summarises the council’s potential maximum exposure to credit risk on the level of default on debtors. 
2022/23
£000
Bad Debt
Provision
£000 
2021/22
£000
Bad Debt
Provision
£000
Debtors 72,509 (5,576) 76,400 6,066 
The Debtors figure above does not include debtors for Council Tax, Non-Domestic Rates and Council House Rents as these
are not considered to be financial assets.
Of the gross Debtors figure included in the note, £13.599m (2021/22: £16.155m) is considered to be past its date for
payment.  This past due amount can be analysed by age as follows: 
2022/23
£000
2021/22
£000
Less than three months 7,257 9,297
Three to six months 538 950
Six months to one year 1,233 1,019
More than one year 4,571 4,889
Total 13,599 16,155 
Nature and Extent of Risks – Liquidity Risk 
Liquidity Risk 
As the council has ready access to borrowings from the Public Works Loans Board, there is no significant risk that it will be unable to
raise finance to meet its commitments under financial instruments. There may be a risk that the council will be bound to replenish a
significant proportion of its borrowings at a time of unfavourable interest rates.
The approved prudential indicator sets limits on the maturity structure of debt, and the council’s approved treasury and investment
strategies address the main risks, and the central Treasury team address the operational risks within the approved parameters. This
includes:
■ Monitoring the maturity profile of financial liabilities and amending the profile through either new borrowing or the
rescheduling of existing debt.
■ Monitoring the maturity profile of investments to ensure sufficient liquidity is available for the Council’s day to day cash
flow requirements.
The maturity analysis of financial liabilities is as follows: 
2022/23
£000
2021/22
£000
Less than one year 31,111 52,459
Between one and two years 33,770 21,770
Between two and five years 260,380 166,238
More than five years 720,381 761,594
Total 1,045,642 1,002,061 
All trade and other payables are due to be paid in less than one year. 
157

Page 158

98 
Nature and Extent of Risks – Market Risk
Interest Rate Risk
The council is exposed to interest rate movements on its borrowings and investments. Movements in interest rates have a
complex impact on the council.
For instance, a rise in interest rates would have the following effects:
■ borrowings at variable rates – the interest expense charged to the Comprehensive Income and Expenditure Statement
will rise
■ borrowings at fixed rates – the fair value of the liabilities borrowings will fall
■ investments at variable rates – the interest income credited to the Comprehensive Income and Expenditure Statement
will rise
■ investments at fixed rates – the fair value of the assets will fall
Borrowings are not carried at fair value, so nominal gains and losses on fixed rate borrowings would not impact on the
Comprehensive Income and Expenditure Statement. However, changes in interest payable and receivable on variable rate
borrowings and investments will be posted to the Comprehensive Income and Expenditure Statement and affect the General
Fund Balance pound for pound. Movements in the fair value of fixed rate investments will be reflected in the Comprehensive
Income and Expenditure Statement unless the investments have been designated at fair value through the Comprehensive
Income and Expenditure Statement.
The council has a number of strategies for managing interest rate risk. The Annual Treasury Management Strategy draws
together the council’s prudential indicators and its expected treasury operations, including an expectation of interest rate
movements. From this Strategy a prudential indicator is set which provides maximum and minimum limits for fixed and
variable interest rate exposure. The central Treasury team will monitor market and forecast interest rates within the year to
adjust exposures appropriately.
A sensitivity analysis has been carried out to assess the financial effect of a 1% variance in interest rates as suggested in
the Code Guidance Notes 2022/2023.
If all interest rates had been 1% higher (with all other variables held constant) the financial effect would be: 
£000
Increase in interest payable on variable rate borrowings 85
Increase in interest receivable on variable rate investments (2,389)
Impact on Comprehensive Income and Expenditure Statement (2,304)
Share of overall impact credited to the HRA (540)
Decrease in fair value of fixed rate investment assets -
Impact on Comprehensive Income and Expenditure Statement -
Decrease in fair value of fixed rate borrowing liabilities
(no impact on Comprehensive Income and Expenditure Statement)
(109,786) 
The approximate impact of a 1% fall in interest rates would be as above but with the movements being reversed. These
assumptions are based on the same methodology as used in the Note – Fair Value of Assets and Liabilities carried at
Amortised Cost.
Price Risk
The council does not invest in equity shares and is therefore not exposed to losses arising from movements in the price of
shares.
Foreign Exchange Risk
The Council has no financial assets or liabilities denominated in foreign currencies. It therefore, has no exposure to loss
arising from movements in exchange rates.
158

Page 159

99 
Note 34 Common Good 
Common Good funds are for the benefit of the geographical areas of the former burghs and the council’s Finance and Corporate Resources Committee considers the uses to which
funds can be put.
Summary of Common Good Funds
2021/22
Total
£000   
Lanark
£000 
Biggar
£000 
Hamilton
£000 
Rutherglen
£000
2022/23
Total
£000  
Income and Expenditure Accounts     
155  Income for Year 97 - 105 2 204
(260)  Expenditure for Year (54) - (113) (1) (168)
(105)  Surplus / (Deficit) To Balance Sheet 43 - (8) 1 36          
Balance Sheet     
Fixed Assets     
2,969  Property, Plant and Equipment 1,463 - 1,558 - 3,021          
Investments     
-  General - - - - -
754  Advances to South Lanarkshire Council Loans Fund 251 25 477 128 881        
53  Debtors - - - - -
3,776  Total Assets 1,714 25 2,035 128 3,902          
Current Liabilities     
(15)  Creditors (4) - (14) - (18)
3,761  Total Assets less Current Liabilities 1,710 25 2,021 128 3,884          
Represented by:     
2,836  Common Good Account 1,168 25 1,421 127 2,741
(105)  Surplus / (Deficit) 43 - (8) 1 36
11  Amortisation of Revaluation Reserve 3 - 7 - 10
-  Gain / Loss on Disposal of Fixed Assets - - - - -
2,742   1,214 25 1,420 128 2,787          
Revaluation Reserve     
1,006  Opening Balance 492 - 530 - 1,022
24  Gain / Loss on Revaluation  7 - 78 - 85
(11)  Amortisation of Revaluation Reserve (3) - (7) - (10)
1,019  Closing Balance 496 - 601 - 1,097        
3,761   1,710 25 2,021 128 3,884
159

Page 160

100 
Note 35 Trust Funds
The council acts as sole trustee for a total of a total of 2 Trust Funds. The most significant fund is the Loudon Bequest which is used to finance holiday projects for elderly people. The
balance of the fund as at 31 March 2023 was £0.821m.
In addition to these funds, the council administers The South Lanarkshire Charitable Trust and The South Lanarkshire Educational Trust on behalf of the Trustees. These Trusts were
established by the council in December 2019 for the purposes of reorganising the trust funds for which the council acts as sole trustee. The process of transferring funds from the original to
the new Trust Funds is ongoing and will be subject to the approval of OSCR.
None of these funds represent assets of the council and as a result are not included in the council’s Balance Sheet. The individual funds are the subject of a separate audit
and audit opinion.
Summary of Trust Funds 
2021/22
Total
£000   
Charitable
£000 
Educational
£000 
EK ITEC
£000
The South 
Lanarkshire
Charitable Trust
£000
The South
Lanarkshire
Educational Trust
£000 
2022/23
Total
£000  Note  
Income and Expenditure Account       
33  Income for Year 33 - - 2 2 37 
(21)  Expenditure for Year (7) - (27) (21) (19) (74) 
12  Surplus / (Deficit) to Balance Sheet 26 - (27) (19) (17) (37) 
Balance Sheet       
833  Investments - General 821 - - 10 - 831 
368  Investments - South Lanarkshire Council 114 - - 108 110 332 
1,201  Net Assets 935 - - 118 110 1,163 
Represented by:       
1,044  Capital Account as at 1/4/2022 901 106 - 10 - 1,007 
(27)  Movement During Year (79) (106) - - - (175) 1
1,017  Capital Account as at 31/3/2023 822 - - 10  832 
147  Revenue Account as at 1/4/2022 105 21 27 31 - 184 
37  Movement During Year 8 (21) (27) 77 110 147 2
184  Revenue Account as at 31/3/2023 113 - - 108 110 331 
1,201  Total Reserves 935 - - 108 110 1,163 
Note 1 The movement on the Capital Accounts represents the net purchase and sale of investments on the Loudon Bequest during the year and the transfer of balances to The South Lanarkshire
Charitable Trust and The South Lanarkshire Educational Trusts
Note 2 The movement on the Revenue Accounts represent the surplus(deficit) for the year along with the transfer of balances to the South Lanarkshire Charitable Trust and the South Lanarkshire
Educational Trust.
160

Page 161

101 
Note 36 Accounting Policies 
A General Principles
The Annual Accounts summarise the council’s transactions
for the 2022/2023 financial year and its position at the year-
end of 31 March 2023. The council is required to prepare
Annual Accounts by the Local Authority Accounts (Scotland)
Regulations 2014, which section 12 of the Local Government
in Scotland Act 2003 requires to be prepared in accordance
with proper accounting practices. These practices primarily
comprise the Code of Practice on Local Authority Accounting
in the United Kingdom 2021/2022, supported by International
Financial Reporting Standards (IFRS) and statutory guidance
issued under section 12 of the 2003 Act.
The accounting convention adopted in the Annual Accounts is
principally historical cost, modified by the revaluation of
certain categories of non-current assets and financial
instruments.
The accounting policies have been applied consistently.
B Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not
simply when cash payments are made or received. In
particular:
■ Revenue from contracts is recognised reflecting the
transfer of goods or services to the recipient at the amount
which the council expects to be entitled to in exchange for
those goods or services.
■ Other revenue is recognised when the council can
measure reliably the percentage of completion of the
transaction and it is probable that economic benefits or
service potential associated with the transaction will flow
to the council.
■ Supplies are recorded as expenditure when they are
consumed – where there is a difference between the
date supplies are received and their consumption, they
are carried as stock on the council’s Balance Sheet.
■ Expenses in relation to services received are recorded
as expenditure when the services are received, rather
than when payments are made.
■ The Corporate i-Procurement system operates
across the council’s service areas.
 For all purchases made via the i-Procurement
system, sundry creditors are now accrued on
the basis of all goods and services received
by 31 March 2023, regardless of value and
materiality. During the financial year, period
end accruals have also been made on a
similar period by period basis.
 For any residual purchases, not made via the
i-Procurement System sundry creditors are
accrued on the basis of payments made
during the first 3 weeks following 31 March
together with specific accruals in respect of
further material items. 
■ Interest payable on borrowings and receivable
on investments is accounted for respectively as
expenditure and income on the basis of the
effective interest rate for the relevant financial
instrument rather than the cash flows fixed or
determined by the contract.
■ Where revenue and expenditure have been
recognised but cash has not yet been received or
paid, a debtor or creditor for the relevant amount is
recorded in the Balance Sheet.
■ Where revenue relating to a contract has been
recognised but cash has not yet been received, this is
recorded in the Balance Sheet as a contract asset.
■ Where cash relating to a contract has been
received in advance of the transfer of goods or
hservices, this is recorded in the Balance Sheet as a
contract liability.
■ Where there is evidence that debts are unlikely to
be settled, the balance of debtors is written down
and a charge made to revenue for the income that
might not be collected.
Where the council is acting as an agent for another
party (for example in the collection of National Non
Domestic Rates and Council Tax), income and
expenditure are recognised only to the extent that
commission is receivable by the council for the
agency services rendered or the council incurs
expenses directly on its own behalf in rendering the
services.
C Cash and Cash Equivalents
Cash is represented by cash in hand and deposits
with financial institutions repayable without penalty
on notice of not more than 24 hours. Cash
equivalents are investments that mature in three
months or less from the date of acquisition and that
are readily convertible to known amounts of cash
with insignificant risk of change in value.
In the Cash Flow Statement, cash and cash
equivalents are shown net of bank overdrafts that are
repayable on demand and form an integral part of the
council’s cash management.
D Charges to Revenue for Non- Current
Assets
Services are debited or credited with the following
amounts to record the cost of holding non-current assets
during the year:
■ depreciation attributable to the assets used by the
relevant service
■ revaluation and impairment losses on assets used
by the service where there are no accumulated gains
in the Revaluation Reserve against which the losses
can be written off
■ amortisation of intangible fixed assets attributable to
the service
■ the reversal of a revaluation or impairment loss
previously charged to the Surplus or Deficit on the
Provision of Services. 
161

Page 162

102 
The council is not required to raise Council Tax to cover
depreciation, revaluation and impairment losses or
amortisation. However, it is required to contribute towards
the reduction in its overall borrowing requirement through
loans fund principal charges. Depreciation, revaluation and
impairment losses and amortisations are therefore replaced
by a statutory adjustment in the General Fund Balance, by
way of an adjusting transaction with the Capital Adjustment
Account in the Movement in Reserves Statement for the
difference between the two.
E Employee Benefits 
Benefits Payable During Employment
Short-term employee benefits (those that fall due wholly
within 12 months of the year-end), such as wages and
salaries, paid annual leave and paid sick leave and any non-
monetary benefits for current employees, are recognised as
an expense in the year in which employees render service to
the council. An accrual is made against services in the
Surplus or Deficit on the Provision of Services for the cost
of holiday entitlements earned by employees but not
taken before the year-end and which employees can carry
forward into the next financial year.  Any accrual made is
required under statute to be reversed out of the General
Fund Balance by a debit / credit to the Accumulating
Compensated Absences Account in the Movement in
Reserves Statement.
In February 2018, the Scottish Government issued Financial
Circular 2/2018 (replacing FC 3/2010), that amends the
absences covered by the statutory mitigation. From 1 April
2018, the flexi and time in lieu absences are no longer
covered by the statute and therefore cannot be reversed
out. In addition, any reversals held in the Statutory
Accumulated Absences Account Reserve were required to
be charged back to the Comprehensive Income and
Expenditure Statement, by 31 March 2020.
In terms of the teachers Statutory Accumulated
Compensated Absences, the methodology for 2022/2023
reflects the changes to teachers’ terms and conditions as per
SCNT 11/26 (12 July 2011).
Termination Benefits
Termination benefits are amounts payable as a result of a
decision by the council to terminate an officer’s employment
before the normal retirement date or an officer’s decision to
accept voluntary redundancy and are charged on an accruals
basis to the Comprehensive Income and Expenditure
Statement when the council is demonstrably committed to
either terminating the employment of an officer or group of
officers or making an offer to encourage voluntary
redundancy.
Where termination benefits involve the enhancement of
pensions, statutory provisions require the General Fund
Balance to be charged with the amount payable by the
council to the pension fund or pensioner in the year. In the
Movement in Reserves Statement, appropriations are
required to and from the Pensions Reserve to remove the
notional debits and credits for termination benefits related to
pensions enhancements and replace them with debits for the
cash paid to the pension fund and pensioners and any such
amounts payable but unpaid at the year end.
Post Employment Benefits
Employees of the council are members of two separate
pension schemes:
■ The Local Government Pension Scheme
(Strathclyde Pension Fund), administered by 
Glasgow City Council.
■ Teachers Pension Scheme administered by the
Scottish Pension Agency (Scottish Government).
Both schemes provided defined benefits to members
(retirement lump sums and pensions), earned as
employees worked for the council.
However, the arrangements for the teachers’ scheme
mean that liabilities for these benefits cannot be
identified specifically to the council. The scheme is
therefore accounted for as if it were a defined
contributions scheme – no liability for future payment of
benefits is recognised in the Balance Sheet and the
Education Service line in the Comprehensive Income
and Expenditure Statement is charged with the
employer’s contributions payable to Teachers’ Pensions
in the year.
The Local Government Pension Scheme
The Local Government Scheme is accounted
for as a defined benefits scheme:
■ The liabilities of the Strathclyde Pension Fund
are included in the Balance Sheet on an
actuarial basis using the projected unit method
– that is an assessment of the future payments
that will be made in relation to retirement
benefits earned to date by employees, based on
assumptions about mortality rates, employee
turnover rates, etc, and projected earnings for
current employees.
■ Liabilities are discounted to their value at current
prices, using a discount rate based on an
average of high-quality corporate bonds.
■ Assets of the Strathclyde Pension Fund are ordinarily
included in the Balance Sheet at their fair value
(current bid prices as required under IAS19), principally
the bid price for quoted securities, estimated fair value
for unquoted securities and market price for property. 
However, while the requirements of IAS19 have been
applied in the current year, the significant nature of the
Asset has been reviewed, and in line with IFRIC14, the
asset has been de-recognised to equate to the level of
the asset ceiling, provided by the Fund’s actuary.  This
reflects the net present value of future service costs
less the net present value of future obligations over the
future working lifetime as at 31 March 2023.
In relation to retirement benefits, statutory provisions require the
General Fund Balance to be charged with the amount payable
by the council to the pension fund or directly to pensioners in the
year, not the amount calculated according to the relevant
accounting standards. In the Movement in Reserves Statement,
this means that there are appropriations to and from the
Pensions Reserve to remove the notional debits and credits for
retirement benefits and replace them with debits for the cash
paid to the pension fund and pensioners and any such amounts
payable but unpaid at the year end. The negative balance that
arises on the Pensions Reserve thereby measures the
beneficial impact on the General Fund of being required to
account for retirement benefits on the basis of cash flows rather
than as benefits are earned by employees.
Discretionary Benefits
The council also has restricted powers to make discretionary
awards of retirement benefits in the event of early
retirements. Any liabilities estimated to arise as a result of an
award to any member of staff (including teachers) are
accrued in the year of the decision to make the award and
162

Page 163

103 
accounted for using the same policies as are applied to the
Local Government Pension Scheme.
F Events After the Reporting Period
There are events, both favourable and unfavourable, that
occur between the end of the reporting period and the date
when the Annual Accounts is authorised for issue.
An adjustment is made to the financial statements where there
is evidence that the event relates to the reporting period,
otherwise the financial statements are not adjusted, and where
the amount is material, a disclosure is made in the notes.
Events taking place after the date of authorisation for issue are
not reflected in the Annual Accounts.
G Material Items of Income and
Expenditure
When items of income and expenditure are material, their
nature and amount is disclosed separately, either on the face
of the Comprehensive Income and Expenditure Statement or
in the notes to the financial statements, depending on how
significant the items are to an understanding of the council’s
financial performance.
H Financial Liabilities
Financial liabilities are recognised on the Balance Sheet when
the council becomes a party to the contractual provisions of a
financial instrument and initially measured at fair value and
carried at their amortised cost.
For most of the borrowings that the council has, this means
that the amount presented in the Balance Sheet is the
outstanding principal repayable (plus accrued interest) and
interest charged to the Comprehensive Income and
Expenditure Statement is the amount payable for the year
according to the loan agreement.
Costs associated with debt restructuring (premiums and
discounts) are charged to the Financing and Investment
Income and Expenditure line in the Comprehensive Income
and Expenditure Statement in the year of repayment of the
original debt in accordance with accounting regulations.
Where premiums and discounts have been charged to
the Comprehensive Income and Expenditure Statement,
regulations permit the costs of restructuring to be
released to revenue over the period of the replacement
loan. The reconciliation of amounts charged to the
Comprehensive Income and Expenditure Statement to
the net charge required against the General Fund
Balance is managed by a transfer to or from the
Financial Instruments Adjustment Account in the
Movement in Reserves Statement.
I Statutory Repayment of Loans Fund Advances 
The repayment of loans fund advances ensures that the
council makes a prudent provision each year to pay off an
element of the accumulated loans fund advances made in
previous financial years.
The policy for the repayment of loans fund advances is to
use the most appropriate method of repayment for individual
capital scheme or projects from the following methods:
■ Asset Life Method – loans fund advances will be
repaid with reference to the life of an asset on
an annuity basis.
■ Funding/Income Profile Method – loans fund
advances will be repaid by reference to an
associated income stream.
For loans fund advances repaid using the annuity
basis, the annual repayment will be calculated
using an appropriate interest rate based on an
average cost of funding capital advances to
services.
The council’s strategy for managing debt includes
making additional voluntary repayments. These
repayments will be used as a tool to reduce
interest costs in the short to medium term by
lowering the council’s need to borrow. These
additional voluntary repayments will be retained
and used to offset higher loans fund repayments
in the long term. All of this helps to ensure that
charges to the revenue account remain prudent
and affordable in the long term. 
J Financial Assets
Financial assets are classified into two types:
■ loans and receivables – assets that have fixed
or determinable payments but are not quoted
in an active market.
■ available-for-sale assets – assets that have a
quoted market price and/or do not have fixed
or determinable payments.
Loans and Receivables
Loans and receivables are recognised on the Balance
Sheet when the council becomes a party to the contractual
provisions of a financial instrument and are initially
measured at fair value, then at amortised cost. For most of
the loans that the council has made, this means that the
amount presented in the Balance Sheet is the outstanding
principal receivable (plus accrued interest) and interest
credited to the Comprehensive Income and Expenditure
Statement is the amount receivable for the year in the loan
agreement. 
Where assets are identified as impaired because of a
likelihood arising from a past event that payments due
under the contract will not be made, the asset is written
down and a charge made to the Financing and Investment
Income and Expenditure line in the Comprehensive Income
and Expenditure Statement. The impairment loss is
measured as the difference between the carrying amount
and the present value of the revised future cash flows
discounted at the asset’s original effective interest rate.
Available-for-Sale Assets
Available for sale assets are assets that have a quoted
market price and / or do not have fixed or determinable
payments and are recognised on the Balance Sheet when
the council becomes a party to the contractual provisions
of a financial instrument and are initially measured and
carried at fair value. Where the asset has fixed or
determinable payments, annual credits to the Financing
and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement for
interest receivable are based on the amortised cost of the
asset multiplied by the effective rate of interest for the
instrument. Where there are no fixed or determinable
payments, income (e.g. dividends) is credited to the
Comprehensive Income and Expenditure Statement when it
becomes receivable by the council. 
163

Page 164

104 
Assets are maintained in the Balance Sheet at fair value.
Values are based on the following principles:
■ instruments with quoted market prices – the
market price
■ other instruments with fixed and determinable
payments – discounted cash flow analysis
■ equity shares with no quoted market prices –
independent appraisal of company valuations.
The inputs to the measurement techniques are
categorised in accordance with the following three levels:
■ Level 1 inputs – quoted prices (unadjusted) in active
markets for identical assets that the authority can access
at the measurement date.
■ Level 2 inputs – inputs other than quoted prices included
within Level 1 that are observable for the asset, either
directly or indirectly.
■ Level 3 inputs – unobservable inputs for the
asset.
Changes in fair value are balanced by an entry in the
Available-for-Sale Reserve and the gain/loss is recognised in
the Surplus or Deficit on Revaluation of Available-for-Sale
Financial Assets. The exception is where impairment losses
have been incurred – these are debited to the Financing and
Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement, along
with any net gain or loss for the asset accumulated in the
Available-for-Sale Reserve. 
K Government Grants and Contributions
Government grants, third party contributions and donations
are recognised as due to the council when there is
reasonable assurance that:
■ the council will comply with the conditions attached to the
payments, and
■ the grants or contributions will be received
Monies advanced as grants and contributions for which
conditions have not been satisfied are carried in the Balance
Sheet as Receipts in Advance. When conditions are
satisfied, the grant or contribution is credited to the relevant
service line (attributable revenue grants/contributions) or
Taxation and Non- Specific Grant Income (non-ring-fenced
revenue grants and all capital grants) in the Comprehensive
Income and Expenditure Statement. Where capital grants
are credited to the Comprehensive Income and Expenditure
Statement, they are reversed out of the General Fund
Balance in the Movement in Reserves Statement.
Where the grant has yet to be used to finance capital
expenditure, it is posted to the Capital Grants Unapplied
Account. Where it has been applied, it is posted to the
Capital Adjustment Account. Amounts in the Capital
Grants Unapplied Account are transferred to the Capital
Adjustment Account once they have been applied.
L Intangible Assets
Expenditure on non-monetary assets that do not have
physical substance but are controlled by the council as a
result of past events (for example, software licences) is
capitalised when it is expected that it will bring benefits to
the council for more than 12 months.
Intangible assets are measured initially at cost.
Amounts are not revalued as the fair value of the assets
held cannot be determined by reference to an active
market. The depreciable amount of an intangible asset is
amortised over its useful life to the relevant service line(s)
in the Comprehensive Income and Expenditure Statement.
The useful life of these assets is deemed to be five years.
M Interests in Companies and Other Entities
The council has material interests in companies and other
entities that have the nature of associates and jointly
controlled entities and require it to prepare group
accounts. More information about these entities is detailed
in the Group Accounts and Notes to the Group Accounts
(pages 112-124).
N Inventories
Inventories are included in the Balance Sheet at the lower of cost
and net realisable value. The value of work in progress has been
made at cost plus an appropriate proportion of overheads, with al-
lowances for foreseeable losses. 
O Leases
Leases are classified as finance leases where the terms of the
lease transfer substantially all the risks and rewards incidental to
ownership of the property, plant or equipment from the lessor to
the lessee. All other leases are classified as operating leases.
Where a lease covers both land and buildings, the land and
buildings elements are considered separately for
classification. 
Operating Leases
Where the council grants an operating lease over a property
or an item of plant or equipment, the asset is retained in the
Balance Sheet.
P Overheads and Support Services
The 2016/2017 Code removed the requirement for councils to
report on a total cost basis per the CIPFA Service Reporting
Code of Practice. Councils are only required to reallocate
overheads and support costs if this is how they treat/report these
services in their management reports throughout the year.
The council reports these as services during the year and does
not allocate them in the management reports, therefore the only
overhead and support allocation will be to the Housing Revenue
Account, where appropriate.
Q  Property, Plant and Equipment
Assets that have physical substance and are held for use in the
supply of goods or services, for rental to others or for
administrative purposes and that are expected to be used
during more than one financial year are classified as Property,
Plant and Equipment.
Recognition
Expenditure on the acquisition, creation or enhancement of
Property, Plant and Equipment is capitalised on an accruals
basis. Expenditure that merely maintains the condition of an asset
e.g. repairs and maintenance is charged as an expense when it is
incurred.
Measurement
Assets are initially measured at cost, comprising:
 the purchase price
 any costs attributable to bringing the asset to the
location and condition necessary for it to be capable of
operating in the manner intended by management
164

Page 165

105 
The council does not capitalise borrowing costs incurred whilst
assets are under construction.
Assets are then carried in the Balance Sheet using the following
measurement bases:
 dwellings – current value, determined using the basis of      
existing use value for social housing (EUV-SH)
 other land and buildings – current value, determined by
the amount that would be paid for the asset in its
existing use (existing use value – EUV)
 vehicles, plant and equipment – where non- property
assets that have short useful lives or low values (or both),
depreciated historical cost basis is used as a proxy for
current value
 infrastructure, community assets and assets under
construction – depreciated historical cost
 surplus assets – current value based on market value in
highest and best use.
Where there is no market-based evidence of fair value
because of the specialist nature of an asset, depreciated
replacement cost is used as an estimate of fair value.
Council Dwellings and non-operational lease portfolio are
valued annually. The remainder of the land and property
assets are valued through a five year rolling programme. The
programme is prioritised by asset type to ensure consistency.
Increases in valuations are matched by credits to the
Revaluation Reserve to recognise unrealised gains.
Where decreases in value are identified, the revaluation loss
is accounted for as follows:
 where there is a balance of revaluation gains for the
asset in the Revaluation Reserve, the carrying amount
of the asset is written down against that balance (up to
the amount of the accumulated gains)
 where there is no balance in the Revaluation Reserve or
insufficient balance, the carrying amount of the asset is
written down against the relevant service line(s) in the
Comprehensive Income and Expenditure Statement.
The Revaluation Reserve contains revaluation gains
recognised since 1 April 2007 only, the date of its formal
implementation. Gains arising before that date have been
consolidated into the Capital Adjustment Account.
The values for land and property assets in the accounts are
based upon certificates produced by the council valuer who
is MRICS qualified (Member of Royal Institute of Chartered
Surveyors) and issued in the name of the council’s Executive
Director of Housing and Technical Resources.
Impairment or Revaluation Loss
Assets are assessed at each year end as to whether there is
any indication that an asset may be impaired.
Where indications of impairment exist and any possible
differences are estimated to be material, the recoverable
amount of the asset is estimated and, where this is less than
the carrying amount of the asset, an impairment loss is
recognised for the shortfall.
Where impairment losses are identified, they are accounted
for as follows:
■ where there is a balance of revaluation gains for the
asset in the Revaluation Reserve, the carrying amount of
the asset is written down against that balance (up to the
amount of the accumulated gains).
■ where there is no balance in the Revaluation Reserve or
insufficient balance, the carrying amount of the asset is
written down against the relevant service line(s) in the
Comprehensive Income and Expenditure Statement.
Where an impairment loss is reversed subsequently, the
reversal is credited to the relevant service line(s) in the
Comprehensive Income and Expenditure Statement, up to the
amount of the original loss, adjusted for depreciation that
would have been charged if the loss had not been recognised.
Assets Held for Sale
Property, land and buildings are classified as ‘Held for Sale’
when the following criteria are met:
■ The property is available for immediate sale in its present
condition;
■ The sale must be highly probable and an active
programme to locate a buyer and complete the plan
must have been initiated;
■ The asset must be actively marketed for sale at a price
that is reasonable in relation to its current fair value;
■ The sale should be expected to qualify for recognition as a
completed sale within one year (although events or
circumstances, may extend the period to complete the sale
beyond one year)
When these criteria are met, assets within the category
‘Property, Plant and Equipment’ will be reclassified to ‘Assets
Held for Sale’
Disposals
When it becomes probable that the carrying amount of an
asset will be recovered principally through a sale
transaction rather than through its continuing use, it is
reclassified as an Asset Held for Sale. The asset is
revalued immediately before reclassification and then
carried at the lower of this amount and fair value less costs
to sell. Where there is a subsequent decrease to fair value
costs to sell, the loss is taken to the Comprehensive
Income and Expenditure Statement. Gains in fair value are
recognised only up to the amount of any previously
recognised losses in the Surplus or Deficit in Provision of
Services.
Disposal and Derecognition of Infrastructure Assets
When a component of an infrastructure asset is disposed of
or decommissioned, the carrying amount of the component
in the Balance Sheet is written off to the Other Operating
Expenditure line in the Comprehensive Income and
Expenditure Statement as part of the gain or loss on
disposal. Receipts from disposals (if any) are credited to
the same line in the Comprehensive Income and
Expenditure Statement, also as part of the gain or loss on
disposal (i.e, netted off against the carrying value of the
asset at the time of the disposal).
The written-off amounts of disposals is not a charge against
the council tax, as the cost of non-current assets is fully
provided for under separate arrangements for capital
financing. Amounts are transferred to the Capital
Adjustment Account from the General Fund Balance in the
Movement in Reserves Statement.
Where any part of infrastructure assets are replaced, an
adaptation provided in a separate update to the Code
assumes that from the introduction of the IFRS based Code
when parts of an asset are replaced or restored the
carrying amount of the derecognised part will be zero
because parts of infrastructure assets are rarely replaced
before the part has been fully consumed. 
165

Page 166

106 
Depreciation
Depreciation is provided for on all Property, Plant and
Equipment assets. An exception is made for assets without
a determinable finite useful life (that is freehold land and
certain Community Assets) and assets that are not yet
available for use (i.e. assets under construction).
Depreciation is calculated on the following bases:
■ dwellings and other buildings – straight-line allocation
over the useful life of the property as estimated by the
valuer (dwellings 40 years, other buildings 10 – 50
years).
■ vehicles, plant and equipment – straight line allocation
over the useful life of the asset (3 – 20 years).
■ infrastructure – straight line allocation over 40 years.
Where an item of Property, Plant and Equipment asset has
major components whose cost is significant in relation to the
total cost of the item, the components are depreciated
separately, if the component has a different useful life or
depreciation method that differs significantly from the
remainder of the asset.
Revaluation gains are also depreciated, with an amount
equal to the difference between current value depreciation
charged on assets and the depreciation that would have
been chargeable based on their historical cost being
transferred each year from the Revaluation Reserve to the
Capital Adjustment Account.
R Heritage Assets
South Lanarkshire Council’s heritage assets comprise
collections held within the Museum Service, Archives and
Information Service and the Library Service.
These collections reflect different aspects of our culture,
identity and history.
Heritage Assets, where the cost or value of the asset are known,
are recognised on the balance sheet at valuation and no
depreciation is charged on these assets. A de-minimis level of
£10,000 has been applied. Assets which have a value of less than
£10,000 will not be recorded on the Balance Sheet.
Heritage assets will only be revalued where there is specific
evidence that a revaluation is required and where the costs of
the revaluation do not outweigh the benefit to users of the
Annual Accounts.
The carrying amounts of heritage assets are reviewed where
there is evidence of impairment, for example where doubts
arise as to its authenticity. 
Any impairment is recognised and measured in accordance
with the council’s general policies on impairment – see page
105.
As a result of the cultural and education value of these
assets, disposals of heritage assets tend to be rare. The
proceeds of such disposals are accounted for in accordance
with the council’s general provisions relating to the disposal of
property plant and equipment and disclosed separately in the
Notes to the Accounts.
S Public Private Partnership (PPP) and Similar
Contracts
PPP and similar contracts are agreements to receive services,
where the responsibility for making available the property, plant
and equipment needed to provide the services passed to the
PPP contractor. As the council is deemed to control the services
that are provided under its PPP schemes and as ownership of
the property, plant and equipment will pass to the council at the
end of the contracts for no additional charge, the council carries
the assets used under the contracts on its Balance Sheet as part
of Property, Plant and Equipment.
The original recognition of these assets at fair value (based
on the cost to purchase the property, plant and equipment)
was balanced by the recognition of a liability for amounts due
to the scheme operator to pay for the capital investment. For
Secondary Schools’ Modernisation Programme – Public
Private Partnership (PPP), the liability was written down by an
initial capital contribution of £48.050m.
The amounts payable to the PPP operators each year are
analysed into five elements:
 fair value of the services received during the year –
debited to the relevant service in the Comprehensive
Income and Expenditure Statement.
 finance cost – an interest charge is debited to the
Financing and Investment Income and Expenditure line in
the Comprehensive Income and Expenditure Statement.
 contingent rent – increases in the amount to be paid for
the property arising during the contract, debited to the
Financing and Investment Income and Expenditure line in
the Comprehensive Income and Expenditure Statement.
 payment towards liability – applied to write down the
Balance Sheet liability towards the PPP operator (the
profile of write-downs is calculated using the same
principles as for a finance lease).
 lifecycle replacement costs – there have been no
lifecycle costs to date.
The Scottish Government’s 2022 Resource Spending Review
contained details of a Service Concession flexibility that related to
the Council’s PPP schools.  The flexibility permits councils to
undertake internal accounting changes that extend the period
over which the principal repayment of the unitary charge can be
made which results in a one-off credit to the General Fund and
ongoing annual savings for a period of time. In the remaining
years following the end of the SCAs, the rescheduled debt
repayments continue until the debt liability has been extinguished.
The Council has applied the permitted change in the calculation of
the statutory charge in 2022-23 and the adopted approach has
been applied across all three such arrangements held by the
Council in line with the key accounting principle of consistency.
The annual unitary charge will continue to be paid to the
contractor over the contract period. The guidance applies to
principal and not to interest, service charge costs or grant. These
will continue to be accounted for over the contract period.  
The Council has applied the permitted change in 2022/2023 and
has been applied to the Secondary Schools PPP and the
Glasgow Southern Orbital financial arrangement.  
Annuity method for revised repayment of debt liability 
The recalculation of the debt liability charges applies the annuity
method to calculate the revised repayments. This method best
represents the consumption of the assets over their useful lives. 
This methodology is applied within the Councils current Loans
Fund repayment policy. The use of an annuity method for the
writing down of the PPP debt liability therefore ensures a
consistent approach for the writing down of all debt which is
financing capital expenditure, in that;
 The annuity method provides a fairer charge than equal
instalments as it takes account of the time value of
money, whereby paying £100 in 10 years’ time is less of
a burden than paying £100 now. 
 The schedule of charges produced by the annuity
166

Page 167

107 
method thus results in a consistent charge over an
asset’s life, considering the real value of the amounts
when they fall due. 
 The annuity method is a prudent basis for providing for
assets that provided a steady flow of benefits over their
useful life.’ 
Useful Economic Life
The most appropriate asset life for the calculation is considered to
be 50 years which replicates the useful asset life of other similar
type assets held on the Council’s balance sheet i.e. schools. The
Council’s Loans Fund methodology use a Useful Economic Life of
50 years when calculating the repayment of debt liability for
borrowing to support capital expenditure for similar types of
assets. The proposed application a useful economic life of 50
years for the council’s 2 PPP or similar arrangement is therefore
considered consistent with current council methodology.
Capital Financing Requirement
The reprofiling of the debt liability repayments over the life of the
asset rather than the life of the contract increases the Capital
Financing Requirement as at 1 April 2022. The increase in the
Capital Financing Requirement will continue to be reduced by the
revised repayments after each PP or similar contract has expired
until the end of the revised period. 
Accounting Treatment
The statutory adjustment can be made as at 1 April in the year
the revised repayments are applied. This option has been
implemented in 2022/2023 and has been applied retrospectively.
Being a cumulative statutory adjustment there is no prior year
restatement of statutory adjustments in the Annual Accounts. The
statutory adjustment up to 31 March 2022 results in a
retrospective debit to the Capital Adjustment account in
2022/2023 with a corresponding credit in the Movement in
Reserves Statement within the General Fund. Further in year
annual reductions will be applied along similar lines as the
retrospective adjustment until the end of the contract period for
each of the three SCAs. Thereafter the revised charges will result
in higher cost being charged to the General fund that the current
repayment profile until the end of the Useful Economic Life.  
T  Provisions, Contingent Liabilities and Contingent Assets
Provisions
Provisions are made where an event has taken place that
gives the council a legal or constructive obligation that
probably requires settlement by a transfer of economic
benefits or service potential, and a reliable estimate can be
made of the amount of the obligation.
Provisions are charged as an expense to the appropriate
service line in the Comprehensive Income and Expenditure
Statement in the year that the council becomes aware of the
obligation, and measured at the best estimate at the Balance
Sheet date of the expenditure required to settle the
obligation, taking into account relevant risks and
uncertainties.
When payments are eventually made, they are charged to the
provision carried in the Balance Sheet. Estimated settlements
are reviewed at the end of each financial year – where it
becomes less than probable that a transfer of economic
benefits will now be required (or a lower settlement than
anticipated is made), the provision is reversed and credited
back to the relevant service.
Contingent Assets and Liabilities
A contingent asset or liability arises where an event has taken
place that gives the council a possible obligation whose
existence will only be confirmed by the occurrence or
otherwise of uncertain future events not wholly within the
control of the council. Contingent assets and liabilities also
arise in circumstances where a provision would otherwise be
made but either it is not probable that an outflow of
resources will be required or the amount of the obligation
cannot be measured reliably.
Contingent assets and liabilities are not recognised in the
Balance Sheet but disclosed in a Note to the Accounts.
U Reserves
Reserves are created by appropriating amounts out of the
General Fund Balance in the Movement in Reserves
Statement. When expenditure to be financed from a reserve
is incurred, it is charged to the appropriate service in the
Comprehensive Income and Expenditure Statement. The
reserve is then appropriated back into the General Fund
Balance in the Movement in Reserves Statement so that
there is no net charge against council tax for the
expenditure.
Usable Reserves
The council has several reserve funds within this category. The
Insurance Fund covers the main classes of insurance and is
earmarked for insurance purposes. The Repairs and Renewals
Fund provides for the upkeep of specific assets held by the
council. The Capital Fund is used to meet the costs of capital
investment and for the repayment of the principal element of
borrowing.
Unusable Reserves
Certain reserves are kept to manage the accounting processes
for non-current assets, financial instruments and retirement
benefits and that do not represent usable resources for the
council. These reserves are explained in Note 13 on pages 67-
69.
V  Revenue Expenditure Funded from Capital under
Statute
Any expenditure incurred during the year that may be
capitalised under statutory provisions but does not result in the
creation of a non-current asset has been charged as
expenditure to the relevant service in the Comprehensive
Income and Expenditure Statement in the year. Where the
council has determined to meet the cost of this expenditure
from existing capital resources or by borrowing, a transfer is
made in the Movement in Reserves Statement from the
General Fund Balance to the Capital Adjustment Account, then
reverses out the amount charged so that there is no impact on
the level of council tax.
W VAT
VAT payable is included as an expense only to the extent that
it is not recoverable from Her Majesty’s Revenue and Customs.
VAT receivable is excluded from income.  
167

Page 168

108 
Note 37 Critical Judgements in Applying Accounting Policies
In applying the accounting policies set out in Note 36, the council has had to make certain judgments about complex
transactions or those involving uncertainty about future events.
The critical judgements made in the Annual Accounts are:
■ The council has entered into a Public Private Partnership (PPP) for the provision of secondary schools, their maintenance
and related facilities. The annual unitary charge payable by the council in respect of this contract is allocated across the
various expenditure headings.  In the main, these transactions reflect the detailed financial model which is in line with the
assumptions made within the service provider’s operating model.  However, in relation to the repayment of debt, the
Council has taken the opportunity to implement the guidance on Service Concessions and has applied this in 2022/2023. 
This has no impact on the payments made to the contractor nor the lifetime of the contract.  Further details are provided in
Note 28.   
■ In assessing potential liabilities arising from legal claims against the council, legal opinion has been sought. The council
has considered and assessed its exposure to potential liabilities and made provision where it is probable that an outflow of
resources will occur and where the amount of liability can be reliably quantified. Where it is not possible to measure the
liability or is not probable in the council’s opinion that there will be a liability to meet, the contingent liability is disclosed in
Note 31.
■ The accounts have been prepared on a going concern basis as it is expected that despite the uncertainty around future
finance settlements, that the council’s process of delivering efficiency savings will provide sufficient resources to finance
future liabilities.
■ Assets held at current value are revalued on a 5 year rolling basis. The council asserts that at any point in time, the
carrying amount does not differ materially from that which would be determined using current value.
■ Where the council receives funding, it considers the degree of control it has over how this funding is to be utilised.  If the
council has no discretion over the utilisation of the funds, it deems that it is acting as an agent and this funding is not
reflected in the council’s income and expenditure, with any amounts owed to/from the council held within its Balance
Sheet. In 2021/2022, funding was provided by the Scottish Government through the council to businesses and individuals
affected by the COVID pandemic.  There has been no similar arrangement in relation to Agency Payments during
2022/2023. 
168

Page 169

109 
Supplementary Statement No 1
Housing Revenue Account Income and Expenditure Statement
This statement reflects the statutory requirement to account for local authority housing provision, as defined in the Housing
(Scotland) Act 1987.
It shows the elements of expenditure incurred in the management and investment of the council’s housing stock and the
funding of this by rents, and other income.
The council has a duty to cover any deficit, and any accumulated surplus is carried forward to future years for use in the
management and investment of its council housing stock.
Housing Revenue Account Income and Expenditure Statement
2021/22    2022/23
£000   £000 £000  
Expenditure  
31,358  Repairs and Maintenance 36,901 
21,073  Supervision and Management 23,057 
35,582  Depreciation and Impairment on Non-Current Assets 38,221 
2,588  Movement in the Allowance for Bad Debts 1,424 
7,421  Other Expenditure 7,030 
98,022  Total Expenditure  106,633     
Income  
(94,967)  Dwelling Rents (98,552) 
(3,008)  Non-Dwelling Rents (2,979) 
-  Housing Support Grants - 
-  Other Income - 
(97,975)  Total Income  (101,531)     
47  Net Cost of HRA Services as included in the Comprehensive
Income and Expenditure Statement 
5,102     
116  HRA Services share of Corporate and Democratic Core  115
-  HRA Share of Other Amounts included in the Whole Council Net Cost
of Services but not Allocated to Specific Services 
-
5,217
163  Net Cost for HRA Services       
HRA share of the operating income and expenditure included in the
Comprehensive Income and Expenditure Statement:  
(1,536)  (Gain) or Loss on the Disposal of Non-Current Assets  (2,353)
8,827  Interest Payable and Similar Charges  9,578
(18)  Interest and Investment Income  (730)
373  Pension Interest Cost and Expected Return on Pension Assets  196
(12,044)  Capital Grants and Contributions Receivable  (12,214)     
(4,235)  (Surplus) / Deficit for the Year on HRA Services  (306) 
Note: The expenditure in the table above is higher than that included in the Comprehensive Income and Expenditure Statement
(page 49) by £1.424 million (2021/2022: £2.588 million). This reflects the CIPFA Code of Practice requirement to transfer the
movement in bad debt from the Net Cost of Services in the CIES to the Financing and Investment Income line, whilst in the
Housing Revenue Account it remains part of the Net Cost of Services figure. 
169

Page 170

110 
Statement of Movement on the Housing Revenue Account Balance
2021/22     2022/23
£000   Notes £000 £000
(12,784)  Balance on the HRA at the end of the Previous Year   (16,241)
(4,235)  Surplus / (Deficit) for the Year on HRA Income and Expenditure Statement  (306) 
(18,020)  Adjustments Permitted by Accounting Standards  (18,499) 
19,338  Adjustments between Accounting Basis and Funding Basis Under Statute  22,795 
(2,917)  Net (Increase) / Decrease Before Transfers to or from Reserves  (3,990) 
(540)  Transfers (to) or from Reserves  610 
(3,457)  (Increase) / Decrease in the Year on the HRA   3,380
(16,241)  Balance on the HRA at the end of the Current Year   (12,861) 
Housing Revenue Account Disclosures
1. Adjustments Permitted by Accounting Standards
2021/22
£000  
2022/23
£000
(18,020)  Charge for Depreciation and Impairment of Non-Current Assets (18,499)
(18,020)  Total (18,499) 
2. Adjustments Between Accounting Basis and Funding Basis Under Statute
2021/22
£000  
2022/23
£000
-  Adjustment involving Revaluation Reserve -
(17,561)  Charge for Depreciation and Impairment of Non-Current Assets (19,729)
-  Adjustment involving Capital Adjustment Account (5,674)
12,044  Capital Grants and Contributions 12,214
6,808  Statutory Provision for the Financing of Capital Investment 4,531
19,637  Capital Expenditure funded by the HRA 26,050
1,536  Adjustment involving Capital Receipts Reserve 8,027
81  Adjustments involving Financial Instruments Adjustment Account 84
(3,314)  Adjustments involving the Pension Reserve (2,705)
107  Adjustments involving the Statutory Accumulated Compensated Absences Account (3)
19,338  Total 22,795 
3. Housing Stock
The council’s housing stock at 31 March 2023 was 25,483 (25,328 at 31 March 2022) in the following categories: 
2021/22
Number   
2022/23
Number
Average
Weekly
Rent
11,883  Houses 11,977 £85.51
1,345  High Rise 1,345 £69.26
5,381  Tenements 5,431 £63.09
4,638  4 in a block 4,660 £76.47
2,081  Maisonettes 2,070 £63.28     
25,328  Total 25,483 
4. Rent Arrears
Rent Arrears at 31 March 2023 were £8.514 million (£8.585 million at 31 March 2022).
5. Impairment of Debtors
In 2022/2023 an impairment of £12.627 million has been provided in the Balance Sheet for irrecoverable rents,
an increase of £0.309 million from the provision of £12.317 million in 2021/2022.
6. Exceptional or Prior Year Adjustments
There were no exceptional items or prior year adjustments not disclosed in the statement.
7. Void Rent Loss
The figures above include rent loss on void properties of £2.526 million (£2.575 million for 2021/2022).
170

Page 171

111 
Supplementary Statement No 2
National Non-Domestic Rates Income Accounts Statement
National Non-Domestic Rates (NNDR) income is collected by councils, but all income is then remitted to the Scottish
Government, where it is pooled nationally, and re-distributed back to councils along with the General Revenue Grant. The table
below details the actual levels of NNDR collected by the council, and the overall increase/decrease between the rates collected
and the amount that the council is entitled to receive under the National Pooling arrangement. 
2021/22   2022/23 
£000   £000 Note
357,113  Gross rates levied and contributions in lieu 359,631 1  
Less:  
(50,517)  Reliefs and other deductions (38,291) 
-  Payments of interest - 
(3,286)  Provision of bad and doubtful debts (4,245) 
303,310  Net Non-Domestic Rate Income  317,095 
-  Adjustment for years prior to the introduction of the pool - 
303,310  Contribution to the National Non-Domestic Rate pool 317,095 
16,002  Net contribution (to) / from National Non-Domestic Rate pool 105,496 
319,312  Gross Non-Domestic Rate Income to the Comprehensive Income and Expenditure
Statement
422,591 
-  Non-Domestic Rate income retained by council (BRIS) - 2
319,312  Non-Domestic Rate Income per the Comprehensive Income and Expenditure
Statement
422,591 
Note 1  In 2022/2023, the gross rates levied amount of £359.631 million (2021/2022: £357.113 million) includes an
amount of £207.909 million (2021/2022: £221.232 million) in relation to NDR Utilities which South Lanarkshire
Council collected on behalf of the Scottish Government. This has resulted in a net contribution from the NDRI
pool to the council of £105,496 million.
Note 2  The Business Rate Incentivisation Scheme (BRIS) permits the council to retain half of the NDR income, which
exceeds the income target set by the Scottish Government. In 2022/2023, the council did not receive any
additional funding from BRIS.
Net Rateable Value Calculation
The amount paid for National Non-Domestic Rates is determined by the rateable value placed on the property by the Assessor
multiplied by the Rate per £, which is determined each year by the Scottish Government. The National Non-Domestic Rates
poundage set by the Scottish Government for 2022/2023 were as follows:
• 49.8p Rate Poundage (49.8p in 2021/2022) for properties with rateable value not greater than £51,000
• 51.1p Intermediate Property Rate (1.3p supplement on poundage) for properties with rateable value between £51,001
and £95,000
• 52.4p Higher Property Rate (2.6p supplement on poundage) for properties with a rateable value greater than £95,000
The additional supplements on the rate poundage contribute towards the cost of the Small Business Bonus Scheme. The
Small Business Bonus Scheme provides a discount of between 25% and 100% to businesses in Scotland with a combined
rateable value of £35,000 or less. 
2022/23
£
Analysis of Rateable Values: 
Rateable Value at 01/04/22 693,403,145
Running Roll (Full Year Rateable Value) 115,457,139
Rateable Value at 31/03/23 808,860,284
Less: Wholly Exempt (3,572,510)
Net Rateable Value at 31/03/23 805,287,774 
South Lanarkshire Council’s Rateable Values at 1 April 2023: £
Commercial 137,124,610
Industrial and Freight Transport 57,770,905
Public Undertakings 427,387,075
Other 71,120,555
Total 693,403,145
171

Page 172

112 
Supplementary Statement No 3
Council Tax Income Account Statement
Councils raise taxes from their residents through the Council Tax – which is a property tax linked to property values. Each
dwelling in a council area is placed into one of 8 valuation bands (A to H). The council determines the annual tax for a band D
property and all other properties are charged a proportion of this, with lower valued properties (Bands A to C) paying less, and
higher valued properties (E to H) paying more. 
2021/22
£000  
2022/23
£000
188,147  Gross Council Tax levied and contributions in lieu 195,600
2,086  Adjustments for prior years Council Tax 1,945
190,233   197,545  
Adjusted for: 
(21,070)  Council Tax Reduction (21,917)
(21,513)  Other discounts and reductions (22,328)
(4,178)  Provision for Non-collection (4,342)
143,472  Transfer to General Fund 148,958
From 1 April 2013, the Council Tax Reduction Scheme replaced Council Tax Benefit, with the resultant decrease in Council
Tax Income shown in the Taxation and Non-Specific Grant Income line in the Comprehensive Income and Expenditure
Statement. Council Tax Benefit grant and payments were previously disclosed as part of General Fund Housing in the Net
Cost of Services.
The calculation of the Council Tax Base 2022/23 
No. of
Dwellings
No. of
Exemptions
Disabled
Relief
Discount
25%
Discount
50%
C Tax
Reduction
Total
Dwellings
Ratio to
Band D
Band D
Equivalent
Band A
(discount) - - (113) 11 -                -    102 5/9 57
Band A 36,776 1,960 (43) 5,051 284        10,437  19,087 6/9 12,725
Band B 31,272 1,204 (15) 3,969 214          6,336  19,564 7/9 15,216
Band C 27,321 656 1 2,656 139          3,565  20,304 8/9 18,048
Band D 22,273 350 (69) 1,743 96          1,544  18,609 9/9 18,609
Band E 20,900 297 106 1,169 73             679  18,576 473/360 24,407
Band F 13,690 102 43 504 35             276  12,730 585/360 20,686
Band G 7,023 59 81 212 24               78  6,569 705/360 12,864
Band H 588 9 9 15 5                 2  548 882/360 1,343        
Class 18
Dwellings -                 
116,089 Total 123,955                
Provision for non-collection (2.875%)  (3,564)      
Council Tax Base 120,391 
Dwellings fall within a valuation band between A to H which is determined by the Assessor. The Council Tax charge is
calculated using the Council Tax Base i.e. Band D equivalents. This value is then increased or decreased depending on the
band. Based on the Council Tax base available to South Lanarkshire Council, the Band D charge for 2022/2023 was £1,223.
South Lanarkshire Council £ per year for 2022/2023
Band A £822.00  Band E £1,620.03
Band B £959.00  Band F £2,003.63
Band C £1,096.00  Band G £2,414,63
Band D £1,233.00  Band H £3,020.85
172

Page 173

113 
GROUP ACCOUNTS
Group Expenditure and Funding Analysis 
Net
Expenditure
Chargeable
To the 
General Fund
And HRA
Balance
£000
2021/22 
Adjustments
between the
Funding and
Accounting
Basis
£000 
Net 
Expenditure 
in the
Comprehensive
Income and
Expenditure
Statement
£000  
Net 
Expenditure
Chargeable
To the 
General Fund
And HRA
Balance
£000
2022/23 
Adjustments
between the
Funding and
Accounting
Basis
£000 
Net 
Expenditure 
in the
Comprehensive
Income and
Expenditure
Statement
£000
127,707 38,336 166,043 Community and Enterprise Resources   
370,610 22,002 392,612 Education Resources   
39,332 9,486 48,818 Finance and Corporate Resources   
Housing and Technical Resources   
(2,917) 376 (2,541) - Housing Revenue Account   
18,682 17,710 36,392 - Housing Other   
187,288 23,817 211,105 Social Work Resources   
2,313 - 2,313 Joint Board   
3,295 863 4,158 Corporate Items   
- 116 116 Corporate and Democratic Core (HRA)   
- - - Non-Distributed Costs – Non-Operational Assets (HRA)   
105 - 105 Common Good   
746,415 112,706 859,121 Net Cost of Services   
(745,658) (31,093) (776,751) Other (Income) and Expenditure   
757 81,613 82,370 (Surplus) or Deficit   
(24,612) (529) (25,141) Share of Associates   
(23,855) 81,084 57,229     
General Fund
including
Subsidiaries 
and HRA 
General Fund
Group
Associates 
Total Group
General Fund
including HRA 
General Fund
including
Subsidiaries 
and HRA 
General Fund
Group
Associates 
Total Group
General Fund
including HRA
(122,460) (42,737) (165,197) Opening General Fund and HRA Balance   
757 (24,612) (23,855) Less/plus Surplus or Deficit on General Fund   
(4,617) - (4,617) Transfers to/from Other Reserves   
(126,320) (67,349) (193,669) Closing General Fund and HRA Balance   
173

Page 174

114 
Group Comprehensive Income and Expenditure Statement
The Comprehensive Income and Expenditure Statement shows the accounting cost in the year of providing services in accordance with the CIPFA Accounting Code of
Practice, rather than the amount to be funded from taxation.  The council raises taxation to cover expenditure in accordance with regulations; this may be different from the
accounting cost. The taxation position is shown in the Expenditure and Funding Analysis and Movement in Reserves Statements.   
Gross
Expenditure
£000
2021/22 
Gross 
Income
£000 
Net
Expenditure /
(Income)
£000   
Gross
Expenditure
£000
2022/23 
Gross 
Income
£000 
Net
Expenditure /
(Income)
£000
216,134 50,091 166,043 Community and Enterprise Resources   
443,501 50,889 392,612 Education Resources   
122,638 73,820 48,818 Finance and Corporate Resources   
Housing and Technical Resources   
95,434 97,975 (2,541) - Housing Revenue Account   
82,114 45,722 36,392 - Housing Other   
460,173 249,068 211,105 Social Work Resources   
2,313 - 2,313 Joint Board   
5,018 860 4,158 Corporate Items   
116 - 116 Corporate and Democratic Core (HRA)   
- - - Non-Distributed Costs – Non-Operational Assets (HRA)   
260 155 105 Common Good   
1,427,701 568,580 859,121 Net Cost of Services    
- 2,752 (2,752) Other Operating Expenditure (Note 9)   
66,565 (202) 66,767 Financing and Investment (Income) and Expenditure (Note 10)   
- 840,766 (840,766) Taxation and Non-Specific Grant Income (Note 11)    
1,494,266 1,411,896 82,370 (Surplus) on Provision of Services      
(25,141) Share of the (Surplus) or Deficit on the provision of services by associates   
57,229 Group (Surplus) / Deficit      
(113,202) (Surplus) / Deficit on Revaluation of Fixed Assets   
(389,181) Re-measurement of the Net Defined Benefit Liability / (Asset)   
(7,026) Share of Other Comprehensive (Income) and Expenditure of Associates and
Joint Ventures   
(509,409) Other Comprehensive (Income) and Expenditure    
(452,180) Total Comprehensive (Income) and Expenditure   
174

Page 175

115 
Group Balance Sheet 
The Balance Sheet shows the value as at the Balance Sheet date of the assets and liabilities recognised by the
council. The net assets of the council (assets less liabilities) are matched by the reserves held by the council.
Reserves are reported in two categories.
■ The first category of reserves are usable reserves, that is those reserves that the council may use to provide
services, subject to the need to maintain a prudent level of reserves and any statutory limitations on their use (for
example the Capital Receipts Reserve that may only be used to fund capital expenditure or repay debt).
■ The second category of reserves is those that the council is not able to use to provide services.
This category of reserves includes reserves that hold unrealised gains and losses (for example the Revaluation
Reserve), where amounts would only become available to provide services if the assets are sold; and reserves that
hold timing differences shown in the Movement in Reserves Statement line ‘Adjustments between accounting
basis and funding basis under regulations’. 
Group
31 March
2022
£000  
Single Entity
31 March
2023
£000
Group
Adjustments
31 March
2023
£000 
Group
31 March
2023
£000
3,669,160 Property, Plant and Equipment   
3,826 Heritage Assets   
247 Intangible Assets   
113,939 Investments in associates and joint ventures   
1,272 Long Term Debtors   
- Other Long Term Assets (Pension)   
3,788,444 Non Current Assets   
25,006 Short Term Investments   
3,942 Inventories   
91,736 Short Term Debtors   
8,131 Assets Held for Sale   
91,476 Cash and Cash Equivalents (see cash flow notes)   
220,291 Current Assets   
(52,459) Short Term Borrowing   
(194,587) Short Term Creditors   
- Contract Liability – IFRS15   
(7,157) Other Short-Term Liabilities (PPP / Finance Leases)   
(2,109) Provisions   
(6,403) Receipts in Advance   
(262,715) Current Liabilities   
- Long Term Creditors   
(729) Long Term Provisions   
(949,602) Long Term Borrowing   
- Liabilities in Associates and Joint Ventures   
(179,133) Other Long-Term Liabilities (PPP / Finance Lease)   
(151,270) Other Long-Term Liabilities (Pension)   
(1,280,734) Long Term Liabilities   
2,465,286 Net Assets   
152,186 Usable Reserves   
2,184,375 Unusable Reserves   
128,725 Group Reserves   
2,465,286 Total Reserves   
The notes on pages 120 to 124 form part of the group financial statements. The unaudited accounts were authorised
for issue on 27 June 2023. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
27 June 2023
175

Page 176

116 
Group Movement in Reserves Statement
This statement shows the movement in the year on the different reserves held by the council, analysed into ‘usable reserves’ (those that can be applied to fund expenditure or reduce local
taxation) and other reserves. The Surplus or (Deficit) on the Provision of Services line shows the true economic cost of providing the council’s services, more details of which are shown in the
Comprehensive Income and Expenditure Statement. These are different from the statutory amounts required to be charged to the General Fund Balance and the Housing Revenue Account for
council tax setting and dwellings rent setting purposes. The Net Increase / Decrease before Transfers to Earmarked Reserves line shows the statutory General Fund Balance and Housing Revenue
Account Balance before any discretionary transfers to or from earmarked reserves undertaken by the council.   
Revenue
Statutory
Funds
Revenue
Statutory
Funds           
General
Fund
Balance
£000 
Housing
Revenue
Account
£000 
Repairs
and
Renewals
Fund
£000 
Insurance
Fund
£000 
Capital
Statutory
Fund
£000 
Capital
Receipts
Reserve
£000 
Total
Usable
Reserves
£000 
Unusable
Reserves
£000 
Total
Council
Reserves
£000
Council’s
Share of
Usable
Reserves of
Subsidiaries
and
Associates
£000
Council’s
Share of
Unusable
Reserves of
Subsidiaries
and
Associates
£000 
Total
Group
Reserves
£000
Balance at 1 April 2022 122,424 16,241 6,496 1,295 4,115 1,615 152,186 2,184,375 2,336,561 57,548 71,177 2,465,286
Movement in reserves
during 2022/23            
Total Comprehensive 
Expenditure and Income            
Adjustments permitted under
accounting standards            
Adjustments between
accounting basis and
funding basis under
regulations 
Adjustments for Changes in
Council’s share of
associates         
- - 
Net Increase / (Decrease)
before Transfers to
Reserves            
Transfers to/ (from)
Reserves 
Increase / (Decrease) in
Year            
Balance at 31 March 2023
carried forward            
176

Page 177

117 
Revenue
Statutory
Funds
Revenue
Statutory
Funds           
General
Fund
Balance
£000 
Housing
Revenue
Account
£000 
Repairs
and
Renewals
Fund
£000 
Insurance
Fund
£000 
Capital
Statutory
Fund
£000 
Capital
Receipts
Reserve
£000 
Total
Usable
Reserves
£000 
Unusable
Reserves
£000 
Total
Council
Reserves
£000
Council’s
Share of
Usable
Reserves of
Subsidiaries
and
Associates
£000
Council’s
Share of
Unusable
Reserves of
Subsidiaries
and
Associates
£000 
Total
Group
Reserves
£000
Balance at 1 April 2021 116,980 12,784 7,484 2,304 4,334 1,934 145,820 1,789,850 1,935,670 37,260 40,176 2,013,106
Movement in reserves
during 2021/22            
Total Comprehensive 
Expenditure and Income
(81,564) 4,235 - - - - (77,329) 478,220 400,891 20,100 31,189 452,180
Adjustments permitted under
accounting standards
12,360 18,020 - - - - 30,380 (30,380) - - - -
Adjustments between
accounting basis and
funding basis under
regulations 
70,571 (19,338) - - - 2,082 53,315 (53,315) - 188 (188) -
Adjustments for Changes in
Council’s share of
associates
- - - - - - - - - - - -
Net Increase / (Decrease)
before Transfers to
Reserves
1,367 2,917 - - - 2,082 6,366 394,525 400,891 20,288 31,001 452,180
Transfers to/ (from)
Reserves 
4,077 540 (988) (1,009) (219) (2,401) - - - - - -
Increase / (Decrease) in
Year
5,444 3,457 (988) (1,009) (219) (319) 6,366 394,525 400,891 20,288 31,001 452,180
Balance at 31 March 2022
carried forward
122,424 16,241 6,496 1,295 4,115 1,615 152,186 2,184,375 2,336,561 57,548 71,177 2,465,286
177

Page 178

118 
Group Cash Flow Statement 
The Cash Flow Statement shows the changes in cash and cash equivalents of the council during the reporting period. 
The statement shows how the council generates and uses cash and cash equivalents by classifying cash flows as operating,
investing and financing activities. The amount of net cash flows arising from operating activities is a key indicator of the extent to 
which the operations of the council are funded by way of taxation and grant income or from the recipients of services provided by
the council. Investing activities represent the extent to which cash outflows have been made for resources which are intended to 
contribute to the council’s future service delivery. Cash flows arising from financing activities are useful in predicting claims on 
future cash flows by providers of capital (that is borrowing) to the council. Further analysis of movements is provided in the cash 
flow notes following the statement. 
2022/22
£000   
2022/23
£000
(82,370) Net surplus / (deficit) on the provision of services 
188,626 Adjust net surplus / deficit on the provision of services for non cash movements 
(63,443) Adjust for items included in the net surplus / deficit on the provision of services that are
investing and financing activities 
42,813 Net cash flows from Operating Activities 
(39,857) Investing Activities 
(19,507) Financing Activities 
(16,551) Net increase / (decrease) in cash and cash equivalents 
115,945 Cash and cash equivalents at the beginning of the reporting period 
99,394 Cash and cash equivalents at the end of the reporting period 
Cash Flow Statement Note – Non-Cash Movements 
The balance of non-cash movements is made up of the following elements: 
31 March
2022
£000  
31 March 
2023
£000
101,462 Depreciation, impairment and amortisation of assets 
17,980 Movement in creditors 
(19,393) Movement in debtors 
(39) Movement in inventories 
87,750 Movement in pension liability 
866 Carrying amount of non-current assets and non-current assets held for sale, sold or
derecognised 
- Other non-cash items charged to the net surplus / deficit on the provision of services 
188,626 Net cash flows from the provision of services for non-cash movements 
Cash Flow Statement Note – Operating Activities – Items Included in Net Surplus / (Deficit) on the
Provision of Services That are Investing and Financing Activities 
The cash flows for these activities include the following items: 
2021/22
£000  
2022/23
£000
(59,825) Capital contributions and grants 
(3,618) Capital receipts applied 
(63,443) Net cash flows from items included in the net surplus / (deficit) on the provision of
services that are investing and financing activities 
178

Page 179

119 
Cash Flow Statement Note – Investing Activities 
2021/22
£000 
2022/23
£000
(133,692) Purchase of property, plant and equipment and intangible assets 
(84,000) Purchase of short term investments 
3,618 Proceeds from the sale of property, plant and equipment and intangible assets 
107,000 Proceeds from short term investments 
67,217 Other receipts from investing activities 
(39,857) Net cash flows from investing activities 
Cash Flow Statement Note – Financing Activities 
2021/22
£000 
2022/23
£000
28,900 Cash receipts of short term and long term borrowing 
(7,453) Cash payments for the reduction of the outstanding liabilities relating to finance leases for
PPP contracts 
(40,954) Repayments of short term and long term borrowing 
(19,507) Net cash flows from financing activities 
Cash Flow Statement Note – Cash and Cash Equivalents 
31 March
2022
£000 
31 March
2023
£000
97 Cash held by officers 
12,215 Bank current accounts  
87,082 Short term deposits 
99,394 Total cash and cash equivalents 
The credit figures shown against Bank Accounts in 2023 relate to balances in the financial ledger. This is due to timing differences in
posting transactions in the ledger. Actual balances held at bank are not in an overdraft position. 
The group cash flow statement represents the single entity cash flow for South Lanarkshire Council adjusted for its subsidiaries,
Routes to Work South, Common Good and South Lanarkshire Leisure and Culture Trust. 
The adjusted figures are as follows: 
South
Lanarkshire
Council
£000 
Routes
to Work
South
£000 
Common
Good
£000
South
Lanarkshire
Leisure &
Culture
Trust
£000 
Total
£000
Net surplus / (deficit) on provision of services     
Adjust net surplus / (deficit) on the provision of services
for non-cash movements     
Adjust for items included in the net surplus / (deficit) that
are investing and financing activities     
Net Cash Flows from Operating Activities     
Investing Activities     
Financing Activities     
Net increase / decrease in cash and cash equivalents     
Cash and cash equivalents at beginning of period      
Cash and cash equivalents at end of reporting
period 
179

Page 180

120 
Notes to Group Financial Statements
Note 1  Notes to the Expenditure and Funding Analysis Statement – Adjustments between Funding
and Accounting Basis
Adjustments from General Fund to arrive at the Comprehensive Income and Expenditure Statement
2022/23       
Adjustments
for Capital
Purposes
£000 
Net change
for the
Pensions
Adjustments 
£000 
Other
Differences
£000
Total
Adjustments
between
Funding and
Accounting
Basis
£000
Community and Enterprise Resources    
Education Resources    
Finance and Corporate Resources    
Housing and Technical Resources    
- Housing Revenue Account    
- Housing Other    
Social Work Resources    
Joint Board    
Corporate Items    
Corporate and Democratic Core (HRA)    
Non-Distributed Costs – Non-Operational Assets (HRA)    
Net Cost of Services    
Other Income and Expenditure from the Expenditure and
Funding Analysis    
Surplus or Deficit    
Share of (Surplus) or Deficit on the Provision of Services
by Associates    
Difference between General Fund Surplus or Deficit
and Comprehensive Income and Expenditure
Statement Surplus or Deficit on the Provision of
Services     
2021/22       
Adjustments
for Capital
Purposes
£000 
Net change
for the
Pensions
Adjustments 
£000 
Other
Differences
£000
Total
Adjustments
between
Funding and
Accounting
Basis
£000
Community and Enterprise Resources 21,217 17,782 (663) 38,336
Education Resources 32,205 13,497 (23,700) 22,002
Finance and Corporate Resources 2,276 7,370 (160) 9,486
Housing and Technical Resources    
- Housing Revenue Account 9,136 2,941 (11,701) 376
- Housing Other 6,775 9,205 1,730 17,710
Social Work Resources 3,307 21,612 (1,102) 23,817
Joint Board - - - -
Corporate Items - 421 442 863
Corporate and Democratic Core (HRA) - - 116 116
Non-Distributed Costs – Non-Operational Assets (HRA) - - - -
Net Cost of Services 74,916 72,828 (35,038) 112,706
Other Income and Expenditure from the Expenditure and
Funding Analysis
(67,340) 9,586 26,661 (31,093)
Surplus or Deficit 7,576 82,414 (8,377) 81,613
Share of (Surplus) or Deficit on the Provision of Services
by Associates
(1,351) 453 369 (529)
Difference between General Fund Surplus or Deficit
and Comprehensive Income and Expenditure
Statement Surplus or Deficit on the Provision of
Services
6,225 82,867 (8,008) 81,084
180

Page 181

121 
Note 2 Expenditure and Income Analysed by Nature (Group) 
The council’s expenditure and income are analysed below:  
2022/23
£000 
2021/22
£000
Expenditure  
Employee Benefits Expenses  655,983
Other Services Expenditure  670,256
Support Services Recharges  -
Depreciation, Amortisation, Impairment  101,462
Interest Payment  56,802
Pension Net Interest Expense  9,586
Impairment on Financial Instruments  177
Loss on the Disposal of Assets  -
Total Expenditure  1,494,266
Income  
Fees and Charges and Other Service Income  369,069
Interest and Investment Income  132
Impairment on Financial Instruments  (334)
Gain on the Disposal of Assets  2,752
Income from Council Tax  143,472
Government Grants and Contributions  896,805
Total Income  1,411,896   
Surplus or Deficit on the Provision of Services  82,370 
Note 3  Investments / Liabilities in Associates and Joint Boards 
The group’s share of the net asset / liabilities by associate and joint board is shown below: 
Investments in associates and joint boards 
31 March
2023
£000 
31 March
2022
£000   
Strathclyde Partnership for Transport 67,926 69,158
Strathclyde Concessionary Travel Scheme Joint Committee 749 681
South Lanarkshire Integration Joint Board 19,920 42,640
Lanarkshire Valuation Joint Board 1,036 1,460
Total 89,631 113,939 
Liabilities in associates and joint boards
31 March
2023
£000
31 March
2022
£000   
Lanarkshire Valuation Joint Board - -
Total - - 
181

Page 182

122 
Note 4 Disclosure of Interests in Other
Entities
The council has adopted the recommendations of the
Code in the United Kingdom 2022/2023, as
supported by the International Financial Reporting
Standard (IFRS), which requires local authorities to
consider their interests in all types of entity to
incorporate into Group Accounts.
A full set of Group Accounts, in addition to the
council’s accounts, has been prepared which
incorporates material balances from identified
associates and joint ventures.
The Financial Statements in the Group Accounts are
prepared in accordance with the Accounting Policies
set out in the Accounting Policies on pages 101-107. 
Note 5 Financial Impact of Consolidation
By including the group entities (details of which are
provided below), the effect on the Group Balance Sheet
is an increase in both Reserves and Net Assets of
£162.982m. This represents the council’s share of the
net assets in these entities. 
Note 6 Group Entities
The Group Accounts consolidate the results of the
council with eight other entities – Common Good Fund,
four joint boards, South Lanarkshire Leisure and Culture
Limited, Routes to Work South and Clyde Valley
Learning and Development Joint Committee. 
The joint boards are:
■ Strathclyde Partnership for Transport
■ Strathclyde Concessionary Travel Scheme   
Joint Committee 
■ Lanarkshire Valuation Joint Board
■ South Lanarkshire Integration Joint Board.
South Lanarkshire Council holds no shares in the
bodies governed by these Boards.
The joint boards have a wide range of functions to
discharge, and members of each Board are elected
councillors and are appointed by the councils in
proportions specified in the legislation.
Under accounting standards guidance, South
Lanarkshire Council can be seen to have significant
influence over these statutory bodies, through
nominated Council Member involvement in the
bodies’ governing Boards.
The Boards are included within the Group Accounts
even when our interest in these bodies is less than
the 20% that is normally presumed to represent
significant influence. 
Further details on each of the Boards and the Trust
are provided below:
Common Good Fund
The Common Good Fund is for the benefit of the
geographical areas of the former burghs and is
administered by the council. The council’s share of the
year-end net asset of £3.884m is included in the
Group Balance Sheet.
The Common Good Account is included within the
council’s core financial statements Note 34.
Strathclyde Partnership for Transport
Strathclyde Partnership for Transport is the statutory
body responsible for formulating the public transport
policy for the 12 local authorities in the former
Strathclyde area of the West of Scotland. The
accounting period for the Board is the twelve months to
31 March 2023.
In 2022/2023, South Lanarkshire Council contributed
14.32% of the entity’s estimated running costs. This
body has been included as an associate in the
council’s Group Accounts, with the council’s share of
the year-end net asset of £67.926m included in the
Group Balance Sheet.
Copies of the Board’s accounts may be obtained from
the Treasurer to Strathclyde Partnership for Transport,
131 St Vincent Street, Glasgow, G2 5JF. The accounts
of the Partnership are subject to audit.
Strathclyde Concessionary Travel Scheme Joint Committee
Strathclyde Concessionary Travel Scheme Joint
Committee comprises the 12 councils within the West of
Scotland and oversees the operation of the
concessionary fares scheme for public transport within
its area. The Strathclyde Passenger Transport
Executive administers the Scheme on behalf of the
Joint Committee. The accounting period for the Joint
Committee is the twelve months to 31 March 2023.
In 2022/2023, South Lanarkshire Council contributed
14.89% of the Committee’s estimated running costs.
This body has been included as an associate in the
council’s Group Accounts with the council’s share of
the year-end net assets of £0.749m included in the
Group Balance Sheet.
Copies of the Board’s accounts may be obtained
from the Treasurer to Strathclyde Concessionary
Travel Scheme Joint Committee, 131 St Vincent
Street, Glasgow, G2 5JF. The accounts of the
Committee are subject to audit.
182

Page 183

123 
Lanarkshire Valuation Joint Board
Lanarkshire Valuation Joint Board was formed in
1996 at local government re-organisation. The
Board maintains the Electoral, Council Tax and Non-
Domestic Rates registers for North and South
Lanarkshire. The Board’s running costs are met by
the two member councils. Surpluses or deficits on
the Board’s operations are shared between the
councils. The accounting period for the Board is the
twelve months to 31 March 2023.
In 2022/2023, South Lanarkshire Council contributed
50.00% of the Board’s estimated running costs.  This
body has been included as an associate in the Group
Accounts, with the council’s share of the year-end net
assets of £1.036m included in the Group Balance
Sheet. 
The following additional disclosures are required under
accounting regulations for Lanarkshire Valuation Joint
Board because the council’s share of the net assets of
the Board exceeds 25%.  
2022/23
£000 
2021/22
£000
Expenditure  4,531 4,698
Total Comprehensive
Income and Expenditure 
747 (3,835)
Fixed Assets  135 156
Long Term Assets 290 1,273   
Current Assets  1,914 1,614
Liabilities due within one
year 
267 (225)
Liabilities due after one
year 
- -
Capital and reserves  2,071 2,818
Contingent liabilities  - -
Capital commitments  - -
Copies of the Board’s accounts may be obtained from
the Treasurer to the Lanarkshire Valuation Joint Board,
Floor 4, Council Offices, Almada Street, Hamilton, ML3
0AB. The accounts of the Board are subject to audit.
South Lanarkshire Integration Joint Board 
South Lanarkshire Integration Joint Board was
established by South Lanarkshire Council with NHS
Lanarkshire to formally integrate health and social care
provision within South Lanarkshire.
South Lanarkshire Council delegated resources of
£162.438m or 24.74% of the Board’s income in
2022/2023. This body has been included as a joint
venture in the Group Accounts, with the council’s 50%
share of the year end net asset (£22.720m) included in
the Group Balance Sheet. 
The following table details the main elements of South
Lanarkshire Council’s share of assets, liabilities and revenues of
the Board. 
2022/23
£000
2021/22
£000   
Expenditure  696,344 618,673
Total Comprehensive
Income and Expenditure 
39,838 (48,259)
Fixed Assets  - -
Current Assets  45,440 85,278
Liabilities due within one
year 
- -
Liabilities due after one year  - -
Capital and Reserves  45,440 85,278
Contingent Liabilities  - -
Capital Commitments  - -
Copies of the Integration Joint Board accounts may be obtained
from the Chief Financial Officer of the South Lanarkshire
Integration Joint Board, Floor 8, Council Offices, Almada Street,
Hamilton, ML3 0AB. The accounts of the Integration Joint Board
are subject to audit.
South Lanarkshire Leisure and Culture Limited 
South Lanarkshire Leisure Limited was established as a Charitable
Trust on 1 April 2002. The Trust became South Lanarkshire
Leisure and Culture Limited in October 2010, when Cultural
Services transferred from South Lanarkshire Council.
It provides the council with a full range of leisure and cultural
services within the South Lanarkshire area.
The Trust is entirely independent of the council under law and
for taxation purposes. The council has neither any shares in,
nor ownership of the Trust. The Company is limited by
guarantee, with each member’s liability limited to £1 in the event
of the Company being wound up. The accounting period for the
trust is the twelve months to 31 March 2023. South Lanarkshire
Council currently has 5 out of the 14 Board positions meaning
35.71% representation on the Board of Directors. 
The Trust meets the definition of a structured entity.  This
describes an entity that has been designed so that the relevant
activities are directed by means of contractual arrangements. In
recognition of this, South Lanarkshire Leisure and Culture
Limited is included in the Group Financial Statements as a
100% subsidiary. 
The accounts of the Trust are published separately and may be
obtained from the Secretary, South Lanarkshire Leisure and
Culture Limited, Floor 5, Council Offices, Almada Street,
Hamilton, ML3 0ABt. The accounts of the Trust are subject to
audit. 
183

Page 184

124 
The following additional disclosures are required under
accounting regulations for South Lanarkshire Leisure and
Culture Limited because the council’s share of the net assets of
the Board exceeds 25%. 
2022/23
£000
2021/22
£000   
Expenditure  44,739 39,525
Total Comprehensive
Income and Expenditure 
57,244 19,180
Fixed Assets  83 72
Long Term Assets  64,881 9,175
Current Assets  8,980 7,993
Liabilities due within one
year 
(6,848) (5,867)
Liabilities due after one
year 
(628) (558)
Long Term Liabilities - -   
Capital and Reserves  66,468 10,815
Contingent Liabilities  - -
Capital Commitments  - - 
On 3 April 2023, the status of South Lanarkshire Leisure and
Culture Limited changed from a Charitable Trust to a Scottish
Charitable Incorporated Organisation.  This will have no impact
on the relationship with the council moving forward.
Routes to Work South 
Routes to Work South was established in 1998. Its main activity
is supporting unemployed and workless residents of South
Lanarkshire into employment, training or further education.
Routes to Work South delivers services to the council and is
funded by the council.
South Lanarkshire Council is the sole member of Routes to
Work South. In recognition of this, Routes to Work South is
included in the Group Financial Statements as a 100%
subsidiary.
The accounts of Routes to Work South are published separately
and may be obtained from the Secretary, Routes to Work South,
1-5 Main Street, Cambuslang, Glasgow G72 7EX.
The following additional disclosures are required under
accounting regulations for Routes to Work South because the
Councils’ share of the net assets exceeds 25%. 
2022/23
£000
2021/22
£000   
Expenditure  2,530 2,148
Total Comprehensive
Income and Expenditure 
(15) (4)
Fixed Assets  23 26
Current Assets  2,276 2,040
Liabilities due within one year  1,495 (1,381)
Liabilities due after one year  (251) (117)
Capital and Reserves  583 568
Contingent Liabilities  - -
Capital Commitments  - - 
Clyde Valley Learning and Development Joint Committee 
Clyde Valley Learning and Development Joint Committee was
established, with the backing of the Scottish Government’s
Efficiency and Reform Fund, to provide procurement of training
activities to each of its member councils. South Lanarkshire
Council is the lead authority for this project and its constituent
membership totalled 12.82% in 2022/2023. This body has been
included as an associate in the council’s Group Accounts,
however, as the Joint Committee net assets at 31 March 2023
are nil, there has been no financial impact on South
Lanarkshire’s Single Entity Accounts. 
The accounts of Clyde Valley Learning and Development Joint
Committee are published separately and may be obtained from
the Treasurer, Finance and Corporate Resources, Floor 4,
Almada Street, Hamilton, ML3 0AB. The Accounts of the Joint
Committee are subject to audit. 
Note 7 Non-Material Interest in Other Entities
The council also has an interest in:
■ Scotland Excel (previously Authorities Buying
Consortium) is a Joint Committee established to serve
the buying requirements of the councils within the former
Strathclyde area. South Lanarkshire Council contributed
5.3% of Scotland Excel’s estimated running costs in
2021/2022, but the financial results of this organisation
have not been consolidated into the council’s Group
Accounts as the amounts are not material. 
. 
184

Page 185

125 
■ West of Scotland European Forum is a Joint Forum
established to develop positive links between the
communities of the region and the institutions of the
European Union. This Joint Fommittee is in the
process of being wound up with 2022/23 being the
proposed final year of account.  There were no
contributions made in year to reduce the residual
balance which will be required to be redistributed to
members upon dissolution.  The financial results of
this organisation have not been consolidated into the
council’s Group Accounts as the amounts are not
material.
■ West of Scotland Archaeology Service is a Joint Service
established to provide planning related archaeological
advice to its 11 member councils. South Lanarkshire
Council contributed 12.4% of the estimated running costs
of the Joint Service in 2022/2023, however, the financial
results of this organisation have not been consolidated
into the council’s Group Accounts as the amounts are not
material.
■ Continuing Education Gateway is a consortium of 10
local authorities in the West of Scotland. It was formed in
April 2000 to further the provision of careers and
educational guidance services. South Lanarkshire
Council contributed 14.50% of the consortium’s
estimated running costs in 2022/2023, however, the
financial results of this organisation have not been
consolidated into the council’s Group Accounts as the
amounts are not material.
■ Glasgow and the Clyde Valley Strategic Development
Planning Authority was established to advise the member
authorities on the structure plan. South Lanarkshire
Council contributed 12.5% of the committee’s estimated
running costs in 2022/2023, however, the financial results
of this organisation have not been consolidated into the
council’s Group Accounts as the amounts are not
material.
■ SEEMIS Group LLP is a not-for-profit body whose
principal activity is the provision of education related
information technology solutions to its member councils.
South Lanarkshire Council contributed 6.21% of the
organisation’s estimated running costs in 2022/2023,
however, the financial results of this organisation have not
been consolidated into the council’s Group Accounts as
the amounts are not material.
■ Glasgow City Region – City Deal Cabinet was established
on 20 January 2015. The purpose of the committee is to
determine the Strategic Development Priorities for the
Clyde Valley Region and to monitor and ensure delivery of
the City Deal Programme as agreed between member
authorities and the UK and Scottish Governments. The
City Deal aims to deliver a £1.1 billion investment
programme, including delivery of labour market and
innovation programmes. South Lanarkshire Council
contributed 17.4% of the organisation’s running costs in
2022/2023, however, the financial results have not been
consolidated into the council’s Group Accounts as the
amounts are not material. 
■ The Rural Development Trust is based in South
Lanarkshire and works with local communities to
deliver innovative solutions including resolving
transport problems in rural areas and developing
markets towns. The council supports the Rural
Development Trust. The financial results have not
been consolidated into the council’s Group
Accounts as the amounts are not material.
■ Regen: FX Youth Trust was established as a
Charitable Trust on 1 April 2007. It serves the
council by developing and co-ordinating out of
school diversion activities within the South
Lanarkshire area. The Trust is entirely independent
of the council under law and for taxation purposes.
The council has neither any shares in, nor
ownership of the Trust. The financial results have
not been consolidated into the council’s Group
Accounts, as the amounts are not material.
■ Clyde Gateway was established to re-develop
large sections of the East End of Glasgow
extending into Shawfield and Rutherglen in South
Lanarkshire. The key stakeholders are Glasgow
City Council, Scottish Enterprise and South
Lanarkshire Council, with the two council partners
providing land holdings on a phased basis over the
anticipated 20-year lifetime of the project as well as
capital funding. The financial results have not been
consolidated into the council's Group Accounts as
the amounts are not material.
185

Page 186

126 
Audit Arrangements 
Under arrangements approved by the Commission for Local Authority Accounts in Scotland (“The Accounts Commission”)
the auditor with overall responsibility for the audit of the accounts of South Lanarkshire Council for the year ended 31 March
2023 is: 
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN 
186

Page 187

127 
Glossary of Terms 
Much of the terminology used in this report is intended to be self-explanatory, however, the following additional definition
and interpretation of terms may be helpful:
1. Current Service Cost (Pensions)
The increase in the current value of a defined benefit scheme’s liabilities, expected to arise from employee service in
the current financial year.
2. Past Service Costs (Pensions)
For a defined benefit scheme, the increase in the present value of the scheme’s liabilities relating to employee service
in prior years arising in the current financial year as a result of the introduction of, or improvement to, retirement
benefits.
3. Interest Cost (Pensions)
For a defined benefit scheme, the expected increase during the financial year of the scheme’s liabilities because the
benefits are one year closer to settlement.
4. Actuarial Gains and Losses (Pensions) 
For a defined benefit scheme, the changes in actuarial deficits or surpluses that arise because events have not
coincided with the actuarial assumptions made for the last valuation (experience gains and losses) or the actuarial
assumptions have changed. 
5. Pension Scheme Liabilities
The liabilities of a defined benefits pension scheme for outgoings due after the valuation date. The scheme’s liabilities,
measured using the ‘projected unit method’, reflect the benefits that the employer is committed to provide for service
up to the valuation date.
6. Pension Reserve
The Pension Reserve recognises the council’s share of the actuarial gains and losses in the Strathclyde Pension Fund
and the change in the council’s share of the net liability chargeable to the Comprehensive Income and Expenditure
Statement.
7. Asset
An item having value to the council in monetary terms. Assets are categorised as either current or non-current. A
current asset will be consumed or cease to have material value within the next financial year (e.g. cash and stock). A
non- current asset provides benefit to the council and the services it provides for a period of more than one year.
8. Liability
A liability is where the council owes payment to an individual or another organisation. A current liability is an amount
which will become payable within the next financial year. A non-current liability is an amount which by arrangement is
payable beyond the next year at some point in the future or to be paid off by an annual sum over the period of time.
9. Contingent Liability
A contingent liability is either:
• A possible obligation arising from past events whose existence will be confirmed only by the occurrence of one or
more uncertain events not wholly within the council’s control, or 
• A present obligation arising from past events where it is not probable that a transfer of economic benefits will
be required, or the amount of the obligation cannot be measured with sufficient reliability. 
10. Capital Expenditure and Financing
This is expenditure incurred in creating, acquiring or improving assets. Expenditure is normally financed by borrowing
(with repayment over a period of years), income from the sale of existing assets, revenue funds or external grants and
contributions.
11. Capital Financed from Current Revenue
This is expenditure incurred in creating, acquiring or improving assets where that expenditure is funded directly
from the revenue account in the year in which it is incurred.
12. Non-Current Assets
Fixed Assets are created as a result of the capital expenditure incurred by the council. As such, they comprise
buildings, property, vehicles, plant and machinery, and computer equipment etc. 
187

Page 188

128 
13. Property, Plant and Equipment
These are assets with physical substance (tangible assets) that are held for use in the production or supply of goods
and services, for rental to others, or for administrative purposes, and expected to be used during more than one year.
These are further analysed in the Notes to the Accounts as follows:
a) Council Dwellings – these are council houses
b) Other Land and Buildings
c) Vehicles, Plant and Equipment
d) Infrastructure Assets – these are assets where there is no prospect of sale or alternative use
e.g. roads, bridges, tunnels, water supply and drainage systems
e)  Community Assets – assets that the council intends to hold in perpetuity that have no determinable useful life and
may have restrictions on their disposal e.g. open land and public parks.
f) Surplus Assets – assets that are not being used to deliver services, but which do not meet the criteria to be
classified as either investment properties or non-current assets held for sale.
g) Assets Under Construction
14. Heritage Assets
Heritage assets are assets that have cultural, environmental, or historical association that make their preservation for
future generations important. Heritage assets are maintained principally for their contribution to knowledge and culture,
and it is this which distinguishes them from other assets e.g. museum artefacts.
15. Assets Held for Sale
These are assets where the carrying value of the asset will be realised through its sale rather than continued use.
16. Intangible Asset
These are assets which do not have a physical substance (e.g. IT software and licences)
17. Depreciation
The measure of the cost of wearing out, consumption or reduction in the useful economic life of the council’s non-
current assets during the financial year, whether from use, the passage of time or obsolescence through technical or
other changes.
18. Impairment
A reduction in the value of non-current asset to below its carrying value in the Balance Sheet.
19. Fair Value
The fair value of an asset is the price at which it could be exchanged in an arm’s length transaction, less where
applicable, any grants receivable towards the purchase or use of the asset.
20. Net Carrying Value
The amount at which non-current assets are included in the Balance Sheet, i.e. historical cost or current value less the
cumulative amounts provided for depreciation.
21. Accrual
The concept that income and expenditure are recognised as they are earned or incurred, not as the money is paid or
received.
22. Provision
An amount put aside in the accounts for future liabilities or losses which are certain or very likely to occur but the
amounts or dates or when they will arise are uncertain.
188

Page 189

Appendix 2 
Table 1 
Reconciliation of Monitoring Position to
Annual Accounts
Actual to 
31/03/23 
(Exec Com,
21 June 2023)
£m
Move
Corporate
Items 
£m
Remove
Transfers
from
Reserves 
£m
Revised
General
Fund
Position per
EFA
£m
Add:
HRA
Position 
£m
Total EFA
per Annual
Accounts 
£m
Statutory
Accounting
Adjustment 
£m
CIES 
Figure per
Annual
Accounts 
£m 
Col 1 Col 2 Col 3 Col 4 Col 5 Col 6 Col 7 Col 8
Community and Enterprise Resources 127.880 - - 127.880 - 127.880 39.343 167.423
Education Resources 409.607 - - 409.607 - 409.607 10.262 419.869
Finance and Corporate Resources 48.041  - 48.041 - 48.041 9.151 57.191
Housing and Technical Resources 18.958 - - 18.958 - 18.958 14.663 33.621
Housing Revenue Account - - - - 3.990 3.990 2.537 6.527
Social Work Resources 210.458 - - 210.458 - 210.458 20.094 230.552
Joint Boards 2.152 - - 2.152 - 2.152 - 2.151
Corporate Items - (0.469) - (0.469) - (0.469) 4.339 3.870
Corporate and Democratic Core - HRA - - - - - - 115 115
Non-Distributed Costs - HRA - - - - - - - -
Total Resources 817.096 (0.469) - 816.627 3.990 820.617 100.704 921.321         
CFCR - 0.874 - 0.874 - 0.874  
Loan Charges 30.320 - - 30.320 - 30.320  
Corporate Items (0.469) 0.469 - - - -  
Council Tax (148.958) - - (148.958) - (148.958)  
General Revenue Grant  (254.817) - - (254.817) - (254.817)  
Non Domestic Rates (422.591) - - (422.591) - (422.591)  
Transfer from Reserves (including CFCR) (71.881) - 71.881 - - -  
Other Income and Expenditure (898.247) 1.343 71.881 (795.172) - (795.172) (30.368) (825.540)         
(Surplus)/Deficit on Provision of Services (51.300) 0.874 71.881 21.455 3.990 25.445 70.336 95.781
5
189

Page 190

Annual Accounts: Restatement of Monitoring Figures Reported 
This Appendix reconciles the monitoring figures reported to the Council’s Executive Committee (21 June 2027) to the figures in the
Council’s Annual Accounts (in the Expenditure and Funding Analysis Statement and the Comprehensive Income and Expenditure
Account). This is detailed below: 
• The starting point for the Expenditure and Funding Analysis (col 1) is the year-end outturn position shown in Appendix 1 of
the report to Executive Committee, 21 June 2023), and is the monitoring surplus of £51.300 million.  An adjustment is made
to move the Corporate Items from the Other Income and Expenditure to the Resources in Appendix 8 (col 2).  This is where
they are shown in the Annual Accounts. 
• Appendix 2 (col 3) then takes this monitoring surplus of £51.300 million, and removes the Transfers from Reserves totalling
£71.881 million, as the accounting requirements require us to remove both Transfers To and Transfers From Reserves, from
these reported Committee figures.   
• The table in Appendix 2 then adds the HRA outturn position (col 5) to give the Council’s total position: a deficit on provision
of services of £18.089 million.  This represents the Council’s outturn position (General Fund plus HRA) on an accounting
basis before Transfers To / Transfers From Reserves and is the position shown in the Expenditure and Funding Analysis (col
6). 
• Finally, the Expenditure and Funding Analysis position (col 7) is adjusted by adding the technical accounting transactions,
including depreciation and pension accounting entries, which are outwith the normal Council monitoring process, to arrive at
the figures in the Comprehensive Income and Expenditure Statement of a deficit of £94.768 million, before the entries to
reverse out the accounting transactions and to add in transfers to and from reserves.  These transactions are for accounting
purposes and reflect the Council spend in line with accounting guidance. They do not change the final outturn position of the
Council and have no impact on the actual position of the Council and the funds available.   
• As detailed in above, the Expenditure and Funding Analysis shows the movement on the General Fund Reserve and HRA
Reserve before any transfers to/from other reserves.  These transfers relate to transfers from Other Reserves including the
Repairs and Renewals Fund (including Winter Maintenance), the Insurance Fund and the IT Development Fund (Capital
190

Page 191

Fund) to offset expenditure and commitments that have been charged to the Revenue Budget but where the funding to pay
for these commitments sits in another Reserve and are shown in Table 3 below. 
• These transfers need to be taken into account to arrive at the total movement in the General Fund Reserve and HRA
Reserve included in the Balance Sheet (Table 2 below).  Table 2 below shows that when these transfers totalling £60.424
million are taken into account (including the Transfer from Unusable Reserves for the implementation of Service
Concessions), the total General Fund and HRA position for the year is an increase of £34.979 million. This increase takes
account of the final year end position of breakeven as well as all transfers to and from all reserves, including those above. 
Table 2 - Total Movement in General Fund Reserve and HRA Reserve General
Fund
£m 
HRA
£m 
Total
£m
Closing General Fund and HRA Balance 122.424 16.241 138.665
(Surplus)/Deficit on General Fund per EFA (21.455) (3.990) (25.445)
Transfer to/(from) Other Reserves (see Table 3) 59.814 0.610 60.424
Total Movement in Year 38.359 (3.380) 34.979
Closing General Fund and HRA Balance 160.783 12.861 173.644 
Table 3 - Transfers to/(from) Other Reserves  General
Fund
£m
Repairs and Renewals (including Winter Maintenance) 1.114
Insurance Fund 0.116
Capital Fund (including IT Development Fund, Central Energy Efficiency Fund, Education
Capital Items Replacement) 
0.661
Capital Receipts Reserve (2.582)
Housing Revenue Account 0.610
Transfer from Unusable Reserves (Service Concessions) 59.733
Total Transfers to/(from) Other Reserves 59.814 
191

Page 192

192

Page 193

Appendix 3
1
South Lanarkshire Council Educational Trusts
Trustees’ Annual Report – for the year ended 31 March 2023
________________________________________________________________________ 
The Trustees present their annual report together with the financial statements and
Independent Auditors’ report for the year ended 31 March 2023. 
Reference and Administration Information 
Charity Name: South Lanarkshire Council Educational Trusts
Charity Number: SC028135
Principal Office: Finance Services
Council Offices
Almada Street
Hamilton
ML3 0AA
Trustees: Finance and Corporate Resources Committee, South Lanarkshire
Council
Independent
Auditors:
Audit Scotland 
Structure, Governance and Management 
Governing Document
South Lanarkshire Council Educational Trusts comprised 18 Charitable Trust Funds /
Bequests established under previous local authorities. Each Trust Fund / Bequest is
restricted for the purpose which it was set up. 
Charity Trustees
The trustees of the charities are elected members (Councillors) of South Lanarkshire
Council.  Trustees are appointed through their election to the Finance and Corporate
Resources Committee of South Lanarkshire Council.  The current trustees of South
Lanarkshire Council Educational Trusts are detailed below: 
Councillor Alex Allison Councillor Graeme Horne
Councillor Walter Brogan (Depute Chair) Councillor Martin Hose
Councillor Matthew Buchanan Councillor Katy Loudon
Councillor Andy Carmichael Councillor Hugh Macdonald
Councillor Maureen Chalmers Councillor Catherine McClymont
Councillor Margaret Cooper Councillor Lesley McDonald (Chair)
Councillor Andrea Cowan Councillor Elaine McDougall
Councillor Maureen Devlin Councillor Mark McGeever
Councillor Colin Dewar Councillor Gladys Ferguson-Miller 
Councillor Mary Donnelly Councillor Richard Nelson
Councillor Joe Fagan (Ex Officio) Councillor Mo Razzaq
Councillor Grant Ferguson Councillor John Ross 
Councillor Celine Handibode (Depute Chair) Councillor Graham Scott 
5
193

Page 194

Appendix 3
2
South Lanarkshire Council Educational Trusts
Trustees’ Annual Report – for the year ended 31 March 2023 
________________________________________________________________________ 
Organisational Structure
The trustees delegate the day-to-day administration of the charities to officers of the Council
through the Scheme of Delegation as approved by South Lanarkshire Council on 18 May
2022. 
The trustees (as elected members of the Council) meet to consider and approve the Annual
Accounts for South Lanarkshire Council which includes the financial statements for all
South Lanarkshire Council Trust Funds.  An annual report on Governance of Trust Funds is
presented to the Finance and Corporate Resources Committee. This report details
expenditure for the preceding financial year. 
Related Parties
Trustees hold this position because they are elected members of South Lanarkshire
Council.  South Lanarkshire Council provides administration services to the Trust. 
Risk Management
It is recognised that there is a risk that the funds of the Trusts are not used for the purpose
that they were intended. To mitigate this risk, the governance arrangements in place ensure
that the Finance and Corporate Resources Committee are advised of the balance and
distribution of funds. In addition, OSCR also receive an annual report on the Trusts and
their purpose. 
Management of Funds and Investment Policy
The trustees rely upon the expertise of South Lanarkshire Council to manage the
investments to ensure the maximum return at least risk to the charity is achieved. 
The funds of the charity are held with South Lanarkshire Council.  The interest received
from South Lanarkshire Council and HM Treasury is shown in the Statement of Receipts
and Payments. 
Trustee Indemnity Insurance
No such insurance has been taken out. 
Reorganisation of South Lanarkshire Council Trust Funds
South Lanarkshire Council established The South Lanarkshire Educational Trust (Charity
Number SC049823) in December 2019 for the purposes of reorganising existing trust funds,
including those held under South Lanarkshire Council Educational Trusts (Charity Number
SC028135).
The constitution of The South Lanarkshire Educational Trust (SC049823) is a Trust Deed
granted by South Lanarkshire Council. It provides a modern constitution with appropriate
purposes, powers and governance arrangements.
The process of transferring the funds from South Lanarkshire Council Educational Trusts
(SC028135) to The South Lanarkshire Educational Trust (SC049823) was approved by
OSCR during 2022/2023.  Assets totalling £126,574 were transferred in 2022/2023. 
194

Page 195

Appendix 3
3
Objectives and Activities 
The objectives of the funds are mainly to provide prizes for school prize givings.  Many of
the bequests relate to certain areas within South Lanarkshire Council and the schools within
those catchment areas.  A few of the bequests may be used to support educational projects
during the school year, if meeting the specific requirements of the bequests. 
Achievements and Performance 
During the year to 31 March 2023, the charity did not pay out any grants as a result of the
ongoing reorganisation of the Trust (2021/2022: £0). 
Financial Review 
Overview 
There was no income received during 2022/2023 due to the transfer of the funds to the new
charity (2021/2022: £58).   
The trust held no cash and bank balances  as at 31 March 2023 (2021/2022: £126,574),
due to the transfer of assets to The South Lanarkshire Educational Trust (SC049823). 
Reserves Policy
Following the transfer of assets to The South Lanarkshire Educational Trust (SC049823)
the trust holds no reserves. 
External Audit
The auditor with responsibility for the audit of the accounts of South Lanarkshire Council
Educational Trusts for the year ended 31 March 2023 is: 
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN 
195

Page 196

Appendix 3
4
South Lanarkshire Council Educational Trusts
Trustees’ Annual Report – for the year ended 31 March 2023
________________________________________________________________________ 
Declaration 
The trustees declare that they have approved the trustees’ report above. 
Signed on behalf of the charity’s trustees 
Signature(s): 
Full Name(s):  LESLEY MCDONALD
Position:  CHAIR OF FINANCE AND CORPORATE RESOURCES
COMMITTEE
Date:  27 JUNE 2023
196

Page 197

Appendix 3
5
South Lanarkshire Council Educational Trusts
Statement of Receipts and Payments for the year ended 31 March 2023
___________________________________________________________________________________________________________________ 
Note Unrestricted
Funds
Restricted
Funds
Expendable
Endowment
Funds
Permanent
Endowment
Funds
Total
Funds
(current
year)
Total
funds
(last
year)  
£ £ £ £ £ £
Receipts       
Grants and Donations 4 - - - - - -
Income from investments other than land and buildings 5 - - - - - 58
Sub Total  - - - - - 58        
Receipts from Assets and Investments sales       
Proceeds from sale of investments 5 - - - - - 0
Sub Total  - - - - - 0
Total Receipts  - - - - - 60        
Payments       
External Audit Fee 7 - -   - 616
Administration Charge 8 - - - - - 295
Grants and Donations 4 - - - - - 0
Total Payments  - - - - - 911        
Net (Payments) / Receipts  - - - - - (853)        
Surplus / (Deficit) for the year  - - - - - (853) 
197

Page 198

Appendix 3
6
South Lanarkshire Council Educational Trusts
Statement of Balances as at 31 March 2023
___________________________________________________________________________________________________________________ 
Note Unrestricted
Funds
Restricted
Funds
Expendable
Endowment
Funds
Permanent
Endowment
Funds
Total
Funds
(current
year)
Total
funds
(last
year)  
£ £ £ £ £ £
Cash and Bank Balances       
Opening Balance  - 126,574 - - 126,574 127,427
Deficit shown on receipts and payments account  - - - - - (853)
Transfer of funds to new Charity   (126,574)   (126,574) 
Closing Balance  - 0 - - 0 126,574        
Investments       
Market Value of Investments in South Lanarkshire
Council 
- - - - - -
Market Value of Government Bonds  - - - - - -
Total Investments  - - - - - - 
Signed on behalf of the charity’s trustees 
Signature(s): 
Full Name(s):  LESLEY MCDONALD
Position:  CHAIR OF FINANCE AND CORPORATE RESOURCES
COMMITTEE
Date:  27 JUNE 2023 
198

Page 199

Appendix 3
7
South Lanarkshire Council Educational Trusts
Notes to the Financial Statements
___________________________________________________________________________________________________________________ 
1. Basis of Accounting
These financial statements have been prepared on the Receipts and Payments basis in accordance with the Charities & Trustee
Investment (Scotland) Act 2005 and the Charities Accounts (Scotland) Regulations 2006 (as amended). 
2. Fund Accounting
Restricted funds are those funds that can only be applied for particular purposes. 
3. Taxation
The charity is not liable to income or capital gains tax on its charitable activities. 
4. Grants and Donations
In the year to 31 March 2023, no donations were received. In the year to 31 March 2023, no grants were paid out (2021/2022: £0). 
5. Trustee Remuneration, Expenses and Related Party Transactions
• No remuneration or expenses were paid to charity trustees or persons connected to a trustee during the year.
• No income was received during 2022/2023 (2020/2021: £58) from South Lanarkshire Council.
• There were no transactions between the charity and any trustee or any connected person during the year. 
6. Cash and Bank Balances
During the year the Trust’s balances were held by South Lanarkshire Council, which manages the administration of the funds on behalf of
the Trustees.  No costs were incurred by the Trust for this administration.  South Lanarkshire Council also acts as the banker for the
charity and as detailed above, all transactions incoming and outgoing are made via the Council’s accounts. The balance was transferred
to The South Lanarkshire Educational Trust (SC049823) during 2022/2023. 
7. External Audit Fee
There was no charge for external audit fee for 2022/2023 (2020/2021: £616). 
199

Page 200

Appendix 3
8
8. Administration Charge
There was no charge for administration of the Trust Fund for 2022/2023 (2021/2022: £295). 
200

Page 201

1 
South Lanarkshire Council Charitable Trusts
Trustees’ Annual Report – for the year ended 31 March 2023
________________________________________________________________________    
The Trustees present their annual report together with the financial statements and
Independent Auditors’ report for the year ended 31 March 2023. 
Reference and Administration Information 
Charity Name: South Lanarkshire Council Charitable Trusts
Charity Number: SC025089
Principal Office: Finance Services
Council Offices
Almada Street
Hamilton
ML3 0AA
Trustees: Finance and Corporate Resources Committee, South Lanarkshire
Council
Independent
Auditors:
Audit Scotland 
Structure, Governance and Management 
Governing Document
South Lanarkshire Council Charitable Trusts comprises 2 Charitable Trust Funds / Bequests
established under previous local authorities.  Each Trust Fund / Bequest is restricted for the
purpose which it was set up. 
Charity Trustees
The trustees of the charities are elected members (Councillors) of South Lanarkshire Council. 
Trustees are appointed through their election to the Finance and Corporate Resources
Committee of South Lanarkshire Council.  The current trustees of South Lanarkshire Council
Charitable Trusts are detailed below: 
Councillor Alex Allison Councillor Graeme Horne
Councillor Walter Brogan (Depute Chair) Councillor Martin Hose
Councillor Matthew Buchanan Councillor Katy Loudon
Councillor Andy Carmichael Councillor Hugh Macdonald
Councillor Maureen Chalmers Councillor Catherine McClymont
Councillor Margaret Cooper Councillor Lesley McDonald (Chair)
Councillor Andrea Cowan Councillor Elaine McDougall
Councillor Maureen Devlin Councillor Mark McGeever
Councillor Colin Dewar Councillor Gladys Ferguson-Miller 
Councillor Mary Donnelly Councillor Richard Nelson
Councillor Joe Fagan (Ex Officio) Councillor Mo Razzaq
Councillor Grant Ferguson Councillor John Ross 
Councillor Celine Handibode (Depute Chair) Councillor Graham Scott 
5
201

Page 202

2 
South Lanarkshire Council Charitable Trusts
Trustees’ Annual Report – for the year ended 31 March 2023
________________________________________________________________________ 
Organisational Structure
The trustees delegate the day-to-day administration of the charities to officers of the Council
through the Scheme of Delegation as approved by South Lanarkshire Council on 18 May 2022. 
The trustees (as elected members of the Council) meet to consider and approve the Annual
Accounts for South Lanarkshire Council which includes the financial statements for all South
Lanarkshire Council Trust Funds.  An annual report on Governance of Trust Funds is
presented to the Finance and Corporate Resources Committee. This report details expenditure
for the preceding financial year. 
Related Parties
Trustees hold this position because they are elected members of South Lanarkshire Council. 
South Lanarkshire Council provides administration services to the Trust. 
Risk Management
It is recognised that there is a risk that the funds of the Trusts are not used for the purpose that
they were intended. To mitigate this risk, the governance arrangements in place ensure
that the Finance and Corporate Resources Committee are advised of the balance and
distribution of funds. In addition, the Office of the Scottish Charity Regulator (OSCR) also
receive an annual report on the Trusts and their purpose. 
Management of Funds and Investment Policy
The trustees rely upon the expertise of South Lanarkshire Council to manage the investments
to ensure the maximum return at least risk to the charity is achieved. 
The majority of the funds of the charity are managed on behalf of the Council by Barclays
Wealth. The investment objective is to provide a sustainable level of income, along with the
prospect of growth in both capital and income through investment in a diversified portfolio of
investments. The market value of these funds as at 31 March 2023 was £970,657 (2021/2022:
£1,044,837). 
The remaining fund of the charity is managed by South Lanarkshire Council. The interest
received is shown in the Statement of Receipts and Payments. 
During 2022/2023 income of £31,414 (2021/2022: £32,784) was received and is shown in the
Statement of Receipts and Payments. 
Trustee Indemnity Insurance
No such insurance has been taken out. 
202

Page 203

3 
South Lanarkshire Council Charitable Trusts
Trustees’ Annual Report – for the year ended 31 March 2023
________________________________________________________________________ 
Reorganisation of South Lanarkshire Council Trust Funds
South Lanarkshire Council established The South Lanarkshire Charitable Trust (Charity
Number SC049819) in December 2019 for the purposes of reorganising existing trust funds,
including those held under South Lanarkshire Council Charitable Trusts (Charity Number
SC025089).
The constitution of The South Lanarkshire Charitable Trust (SC049819) is a Trust Deed
granted by South Lanarkshire Council. It provides a modern constitution with appropriate
purposes, powers and governance arrangements.
The process of transferring the funds from South Lanarkshire Council Charitable Trusts
(SC025089) to The South Lanarkshire Charitable Trust (SC049819) is ongoing.  During
2022/23, OSCR approved the transfer of assets totalling £96,034.  There are 2 Charitable Trust
Funds / Bequests established under previous local authorities remaining. 
Objectives and Activities 
The most significant fund is the Loudon Bequest Trust Fund which was used to help finance
holidays for elderly people within 12 Local Authority areas in the West of Scotland. 
The other Trust Fund was held by a previous District Council and provided financial assistance
to organisations and individuals who met the terms set by the specific fund. 
Achievements and Performance 
During the year to 31 March 2023, no grants were paid out. 
Financial Review 
Overview 
Income during 2022/2023 came from income on external investments of £29,453 (2021/2022:
£26,283); interest calculated on the Trust Funds’ revenue balances of £1,848 (2021/2022:
£80).   
Proceeds from the sale of investments of £2,931 (2021/2022: £6,351) were received. 
The trust held cash and bank balances of £141,031 (2021/2022: £182,950) as at 31 March
2023 and investments with a book value of £820,639 (2021/2022: £823,458). 
203

Page 204

4 
South Lanarkshire Council Charitable Trusts
Trustees’ Annual Report – for the year ended 31 March 2023 
________________________________________________________________________ 
Reserves Policy
The trusts are managed in order to allow the full potential benefit of the trusts to be realised. 
By ensuring distributed funds are of sufficient value to make a beneficial impact to recipients,
there may be some erosion of capital.  The Reserves of the Trust will be used in line with the
specific requirements of the Trust. 
External Audit
The auditor with responsibility for the audit of the accounts of South Lanarkshire Council
Charitable Trusts for the year ended 31 March 2023 is: 
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN 
Declaration 
The trustees declare that they have approved the trustees’ report above. 
Signed on behalf of the charity’s trustees 
Signature(s): 
Full Name(s):  LESLEY MCDONALD
Position:  CHAIR OF FINANCE AND CORPORATE RESOURCES
COMMITTEE
Date:  27 JUNE 2023 
204

Page 205

5 
South Lanarkshire Council Charitable Trusts
Statement of Receipts and Payments for the year ended 31 March 2023
___________________________________________________________________________________________________________________ 
Note Unrestricted
Funds
Restricted
Funds
Expendable
Endowment
Funds
Permanent
Endowment
Funds
Total
Funds
(current
year)
Total Funds
(last year)
Restated  
£ £ £ £ £ £
Receipts       
Donations  - - - - - -
Income from investments other than land and
buildings
4 - 31,301 - - 31,301 26,363
Sub Total  - 31,301 - - 31,301 26,363
Receipts from Assets and Investments sales       
Proceeds from sale of investments 4 - 2,931 - - 2,931 6,351
Sub Total  - - - - - 6,351
Total Receipts  - 34,232 - - 34,232 32,714        
Payments       
External Audit Fee 8 - 1,808 - - 1,808 4,680
Investment Management Costs 7  2,932   2,932 3,105
Administration Charge 9  2,377   2,377 4,212
Grants and Donations 5 - 0 - - 0 0
Purchase of Investments 4  0   0 3,245
Total Payments  - 7,117 - - 7,117 15,242
Net Receipts  - 27,115 - - 27,115 17,472
Surplus / (Deficit) for the year  - 27,115 - - 27,115 17,472 
205

Page 206

6 
South Lanarkshire Council Charitable Trusts
Statement of Balances as at 31 March 2023
___________________________________________________________________________________________________________________ 
Note Unrestricted
Funds
Restricted
Funds
Expendable
Endowment
Funds
Permanent
Endowment
Funds
Total
Funds
(current
year)
Total
Funds (last
year)
Restated  
£ £ £ £ £ £
Cash and Bank Balances       
Opening Balance  - 182,950 - - 182,950 200,335
Transfer of Assets to the South Lanarkshire
Charitable Trust    (96,034)    (96,034)  (34,857)
Surplus shown on receipts and payments account  - 27,115 - - 27,115 17,472
Closing Balance  - 114,031 - - 114,031 182,950        
Investments       
Market Value of Investments (Clydeport –
transferred to The South Lanarkshire Charitable
Trust)
7  
- -  -  -  -  -
Market Value of Investments (Managed by Barclays
Wealth)
7 - 970,657 - - 970,657 1,044,837
Total Investments  - 970,657 - - 970,657 1,044,837
Signed on behalf of the charity’s trustees 
Signature(s): 
Full Name(s):  LESLEY MCDONALD
Position:  CHAIR OF FINANCE AND CORPORATE RESOURCES COMMITTEE
Date: 27 JUNE 2023
206

Page 207

7 
South Lanarkshire Council Charitable Trusts
Notes to the Financial Statements 
___________________________________________________________________________________________________________________ 
1. Basis of Accounting
These financial statements have been prepared on the Receipts and Payments basis in accordance with the Charities & Trustee
Investment (Scotland) Act 2005 and the Charities Accounts (Scotland) Regulations 2006 (as amended). 
2. Fund Accounting
Restricted funds are those funds that can only be applied for particular purposes. 
3. Taxation
The charity is not liable to income or capital gains tax on its charitable activities. 
4. Trustee Remuneration, Expenses and Related Party Transactions
• No remuneration or expenses were paid to charity trustees or persons connected to a trustee during the year.
• The trust received income from external investments of £29,453 (2021/2022: £26,283) and £1,848 (2021/2022: £80) from South
Lanarkshire Council. All transactions incoming and outgoing are made via South Lanarkshire Council’s accounts.
• Proceeds from the sale of the Loudon Bequest investment of £2,931 (2021/2022: £6,351) were received.
• Purchase costs of the Loudon Bequest investment of £0 (2021/2022: £3,245) were incurred.
• There were no transactions between the charity and any trustee or any connected person during the year. 
5. Grants
In the year to 31 March 2023, there were no grants were paid out as the process of transferring the funds from South Lanarkshire Council
Charitable Trusts (SC025089) to The South Lanarkshire Charitable Trust (SC049819) was ongoing. During 2021/22 no grants were paid
out.   
207

Page 208

8 
South Lanarkshire Council Charitable Trusts
Notes to the Financial Statements 
___________________________________________________________________________________________________________________ 
6. Cash and Bank Balances
During the year the Trust’s balances were held by South Lanarkshire Council, which manages the administration of the funds on behalf of
the Trustees.  No costs were incurred by the Trust for this administration.  South Lanarkshire Council also acts as the banker for the
charity and as detailed above, all transactions incoming and outgoing are made via the Council’s accounts. The balances are repayable
on demand and interest is payable on balances. 
7. Investments 
The charity has one investment managed by Barclays Wealth £970,657 (2021/2022: £1,044,837) on behalf of the Council with an
objective of achieving a balance between income and capital growth subject to a medium level of risk. Barclays Wealth charged a portfolio
management fee of £2,931 (2021/2022; £3,105). 
8. External Audit Fee 
The external audit fee for 2022/2023 £1,808 (2021/2022: £4,680) is paid to Audit Scotland. 
9. Administration Charge
A charge for administration of the Trust Fund for 2022/2023 £2,377 (2021/2022: £4,212) is paid to South Lanarkshire Council. 
208

Page 209

1 
East Kilbride Information Technology Centre Trust 
Trustees’ Annual Report – for the year ended 31 March 2023
________________________________________________________________________ 
The Trustees present their annual report together with the financial statements and
Independent Auditors’ report for the year ended 31 March 2023. 
Reference and Administration Information 
Charity Name: East Kilbride Information Technology Centre Trust
Charity Number: SC015221
Principal Office: Finance Services
Council Offices
Almada Street
Hamilton
ML3 0AA
Trustees: Councillor Margaret Cowie, Councillor Graeme Horne, Councillor
Grant Hose and Councillor Gladys Ferguson-Miller
Independent
Auditors:
Audit Scotland 
Structure, Governance and Management 
Governing Document
East Kilbride Information Technology Trust is recognised as a Scottish charity.
The Deed of Trust states that the charity should provide for young unemployed people living
in East Kilbride, training and education appropriate to their needs in basic information
technology and the opportunity to develop these skills. 
Organisational Structure
The trustees delegate the day-to-day administration of the Trust to officers of the Council
through the Scheme of Delegation as approved by South Lanarkshire Council on 18 May
2022. 
The trustees (as elected members of the Council) meet to consider and approve the Annual
Accounts for South Lanarkshire Council which includes the financial statements for all
South Lanarkshire Council Trust Funds.  An annual report on Governance of Trust Funds is
presented to the Finance and Corporate Resources Committee. This report details
expenditure for the preceding financial year. 
Related Parties
Trustees hold this position because they are elected members of South Lanarkshire
Council.  South Lanarkshire Council provides administration services to the Trust. 
Risk Management
It is recognised that there is a risk that the funds of the Trust is not used for the purpose that
they were intended. To mitigate this risk, the governance arrangements in place ensure
that the Finance and Corporate Resources Committee are advised of the balance and
distribution of funds. In addition, OSCR also receive an annual report on the Trusts and
their purpose.
5
209

Page 210

2 
East Kilbride Information Technology Centre Trust 
Trustees’ Annual Report – for the year ended 31 March 2023
________________________________________________________________________ 
Management of Funds and Investment Policy
The trustees rely upon the expertise of South Lanarkshire Council to manage the
investments to ensure the maximum return at least risk to the charity is achieved. 
The funds of the charity are internally deposited with South Lanarkshire Council. The
interest received from South Lanarkshire Council is shown in the Statement of Receipts and
Payments. 
Trustee Indemnity Insurance
No such insurance has been taken out. 
Objectives and Activities 
To establish and operate the Centre in East Kilbride so as to provide for young unemployed
people living in the East Kilbride District.  To provide training and education appropriate to
their needs in basic electronic assembly computing, electronic office and other work
involving the use of new technology.  To develop their skills in those fields and make these
skills available as a community resource.  Also, to take any action in furtherance of or
ancillary to the foregoing, to enable the Trustees to fulfil the purposes of the Trust. 
Achievements and Performance 
The fund was fully utilised during 2022/23.  The funds were used to purchase laptops for
South Lanarkshire College. 
Financial Review 
Overview 
There was no income during 2022/2023 (2021/2022: £12).  The trust holds no cash and
bank balances after utilisation of the funds (2021/2022: £26,677). 
Reserves Policy
Following the full expenditure of the funds, the Trust holds no reserves. 
External Audit 
The auditor with responsibility for the audit of the accounts of East Kilbride Information
Technology Centre Trust for the year ended 31 March 2023 is: 
Audit Scotland
4th Floor
102 West Port
Edinburgh
EH3 9DN 
210

Page 211

3 
Declaration 
The trustees declare that they have approved the trustees’ report above. 
Signed on behalf of the charity’s trustees 
Signature(s): 
Full Name(s):  COUNCILLOR GLADYS FERGUSON-MILLER
Position:  TRUSTEE
Date:  27 JUNE 2023
211

Page 212

4 
East Kilbride Information Technology Centre Trust
Statement of Receipts and Payments for the year ended 31 March 2023
__________________________________________________________________________________________________________________ 
Note Unrestricted
Funds
Restricted
Funds
Expendable
Endowment
Funds
Permanent
Endowment
Funds
Total
Funds
(current
year)
Total
funds
(last
year)  
£ £ £ £ £ £
Receipts       
Income from investments other than land and buildings 4 - - - - - 12
Sub Total  - - - - - 12        
Payments       
External Audit Fee 7 - - - - - 130
Administration Charge 8 - - - - - 62
Grants and Donations 5 - 26,677 - - 26,677 0
Total Payments  - 26,677 - - 26,677 192        
Net Receipts   - (26,677) - - (26,677) (180)        
Surplus / (Deficit) for the year  - (26,677) - - (26,677) (180) 
212

Page 213

5 
East Kilbride Information Technology Centre Trust
Statement of Balances as at 31 March 2023
___________________________________________________________________________________________________________________ 
Note Unrestricted
Funds
Restricted
Funds
Expendable
Endowment
Funds
Permanent
Endowment
Funds
Total
Funds
(current
period)
Total
funds
last
period  
£ £ £ £ £ £
Cash and Bank Balances 6      
Opening Balance  - 26,677 - - 26,677 26,857
Deficit shown on receipts and payments account  - (26,677) - - (26,677) (180)
Closing Balance  - 0 - - 0 26,677        
Investments       
Market Value of Investments   - - - - - -
Total Investments  - - - - - - 
Signed on behalf of the charity’s trustees 
Signature(s): 
Full Name(s):  COUNCILLOR GLADYS FERGUSON-MILLER
Position:  TRUSTEE
Date:  27 JUNE 2023
213

Page 214

6 
East Kilbride Information Technology Centre Trust
Notes to the Financial Statements
___________________________________________________________________________________________________________________ 
1. Basis of Accounting
These financial statements have been prepared on the Receipts and Payments basis in accordance with the Charities & Trustee
Investment (Scotland) Act 2005 and the Charities Accounts (Scotland) Regulations 2006 (as amended). 
2. Fund Accounting
Restricted funds are those funds that can only be applied for particular purposes. 
3. Taxation
The charity is not liable to income or capital gains tax on its charitable activities. 
4. Trustee Remuneration, Expenses and Related Party Transactions
• No remuneration or expenses were paid to charity trustees or persons connected to a trustee during the year.
• The trust did not receive interest in 2022/2023 (2020/2021: £12) from South Lanarkshire Council.
• There were no transactions between the charity and any trustee or any connected person during the year. 
5. Grants and Donations
The full balance on the fund was used to fund the purchase of laptops for South Lanarkshire College during the financial year to 31 March
2023. 
6. Cash and Bank Balances
During the year the Trust’s balances were held by South Lanarkshire Council, which manages the administration of the funds on behalf of
the Trustees.  No costs were incurred by the Trust for this administration. The full balance was utilised during 2022/2023. 
7. External Audit Fee
There was no external audit fee charged to the Trust for 2022/2023 (2021/2022: £130). 
8. Administration Charge
There was no charge for administration of the Trust Fund for 2022/2023 (2021/2022: £62).
214

Page 215

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 27 June 2023
Report by: Executive Director (Finance and Corporate Resources) 
Subject: Internal Audit Activity as at 9 June 2023     
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update the Risk and Audit Scrutiny Committee (RASC) on progress of the
Internal Audit service in the period 6 May to 9 June 2023 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that progress be noted. 
3. Background 
3.1. Findings from internal audit assignments are reported to the Committee throughout
the year. The last progress report to the Committee was 23 May 2023 and reported
on work completed in the period 18 February to 5 May 2023. This report covers all
work completed in the period 6 May to 9 June 2023.  Performance information is also
included. 
4. Delivery of the Internal Audit Plan: Progress 
4.1. As at 9 June 2023, 94% of the 2022/2023 Audit Plan was complete with 3
assignments still work in progress at that date.  Preparatory work has started on the
2023/2024 Plan. 
4.2. Key performance indicators reflecting quality, on time and within budget for the
2022/2023 Internal Audit Plan are summarised in Appendix 1 together with
explanations. 3 from 5 indicators exceeded targets with the other 2 indicators falling
marginally behind target. 
4.3. Appendix 2 lists all assignments completed in the period 6 May to 9 June 2023
together with a summary of overall assurances from each area of work.   
5. Public Sector Internal Audit Standards - External Review
5.1. The external review is in progress and is expected to conclude by the end of this
month.  The Committee was advised in March 2023 that the findings from the review
would be reported in June 2023.  Members are being asked to note that, although
this output is not available at the date of writing this report, it is anticipated that the
review will conclude with the next 2 weeks (and the formal output reported to a
subsequent meeting of the Committee).  There have been no significant findings
reported to date and the function is anticipated to be assessed as continuing to
6
215

Page 216

generally conform with the requirements of the Public Sector Internal Audit
Standards. 
6. Progress against Strategy
6.1. The Public Sector Internal Audit Standards (PSIAS) require progress against the
audit strategy to be monitored and reported to the Committee as part of regular
monitoring reports that are presented at each meeting. 
6.2. Delivery of the strategy in 2022/2023 has been evidenced by the material completion
of the Internal Audit Plan in year monitored during the year by performance
indicators which have been regularly reported to the Committee. 
7. Employee Implications 
7.1. There are no employee issues. 
8. Financial Implications
8.1. The confirmed final financial position for the Internal Audit function for 2022/2023 is a
marginal overspend that reflected lower than anticipated fees from external clients. 
9. Climate Change, Sustainability and Environmental Implications
9.1 There are no Climate Change, Sustainability and Environmental implications relating
to this report. 
10. Other Implications
10.1. The main risks to the delivery of the Audit Plan are, generally, vacancies and team
up-skilling requirements, unforeseen service demands and delays with client sign-off. 
These have been mitigated by coaching and training, regular meetings and
escalation processes as well as inclusion of contingency time within the annual plan. 
The risk of significant, subsequent amendments to the Plan, arising from a change in
the Council’s priorities or risks, were reduced given the approach in 2022/2023 that
has allowed capacity and content to be reassessed mid-year.     
10.2. There are no implications for sustainability in terms of the information contained in
this report. 
11. Equality Impact Assessment and Consultation Arrangements
11.1 There is no requirement to equality assess the contents of this report. 
11.2. Heads of Service are consulted on each and every audit assignment. 
Paul Manning
Executive Director Finance and Corporate Resources 
9 June 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
216

Page 217

Previous References
 Risk and Audit Scrutiny Committee - 2022/2023 Internal Audit Plan -  26 January 2022
 Risk and Audit Scrutiny Committee - Internal Audit Activity as at 5 May 2023 - 23 May
2023 
List of Background Papers
 Figtree extracts of Action Plans 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Yvonne Douglas, Audit and Compliance Manager
Tel:-  01698 452618
E-mail:-  yvonne.douglas@southlanarkshire.gov.uk 
217

Page 218

Key audit performance indicators as at 31 March 2023          Appendix 1 
Indicator Numbers Percentage Target Comment
Assignments
delivered within
budget
30/38 79% 80% Marginally below target.
Draft reports
delivered within 6
weeks of file
review 
43/43 100% 80% 
2022/2023 Audit
Plan completed
to draft by 30
April 2023
45/48 94% 100%
The three outstanding audit assignments at this date related to a special
investigation and two routine assignments covering petty cash and purchase
cards.
Internal Audit
recommendations
delivered on time
15/15 100% 90% 
Client to agree
findings and
actions within 4
weeks of draft
issue
38/38 100% 80% 
218

Page 219

Assignments completed 6 May to 9 June 2023    Appendix 2 
Job
Number Assignment name
Draft
Issue Final Issue Assurance Info 
Current Year 
I420085 Fraud Policies 07/02/2023 23/05/2023 Revised fraud policy
presented to RASC.
I613198 Anti-fraud checks  31/03/2023 31/03/2023 Work deferred to
release resources to
assist with the
implementation of
Fusion.
I677204 Whistle Blowing concern 31/03/2023 31/03/2023 Investigated by
Resource.  No
significant outcome
and, therefore, not
investigated by
Internal Audit.
I410092 Follow-up Procurement 31/03/2023 31/03/2023 Work deferred to
assess impact of
implementation of
Fusion.
I341105 Sustainability 12/04/2023 12/04/2023 Position Statement –
see Appendix 3. 
219

Page 220

Appendix 3 
Position Statement: Sustainability 
Objective 
To provide a position statement of progress with the Sustainability agenda across the
following areas; governance; risk management; detailed short and medium term action
plans; net zero targets; longer term route maps; decision-making processes and tools and
collaboration and community empowerment. 
Key Summary
SLC have clearly set out the Council’s ultimate climate change goals.  
The first being that SLC will no longer be generating any carbon emissions from its non-
domestic buildings within the next 15 years, which is in line with the Scottish Government’s
expectations for the Scottish public sector.  This effectively means a shift to heat and power
from electricity (or other sustainable sources) for all buildings as opposed to gas and oil. 
This is a significant undertaking given the size of the Council’s current non-domestic estate
that still has gas or oil heating systems.  It is essential that decisions taken now, in relation
to SLC’s buildings, support the future zero emission goals.  Consideration needs to be
given to what SLC’s estate may need to look like in the future so that relatively limited funds
can be spent in the best way in the short to medium-term.  
The second goal is for fleet/pool cars to no longer be generating any carbon emissions
within the next 15 years.  Again, a significant undertaking which will require all Council
transport decisions to fully reflect these objectives and the Scottish Government’s
expectations that the purchase of new petrol and diesel light commercial vehicles will begin
to be phased out in the next couple of years. 
In addition to these targets, which are directly within the Council’s control, SLC have also
now pledged to influence a reduction in the emissions generated from household waste and
employee travel to progress towards to net zero emissions in the next couple of decades
(through to 2045/2046).    
A key assumption being used by the Council is that the electricity grid will be net zero by
2035 (i.e. derived from sustainable sources).  This effectively means that by using electricity
from the grid, the Council will achieve net zero for lighting and activities powered by grid
electricity. 
Once reviews and feasibility studies are complete, SLC can then agree a “route-map” with
milestones for both direct and indirect emissions. 
In addition to these key objectives are a myriad of other actions outlined within the current
sustainable development and climate change strategy, including aims to manage the
natural environment well; encourage sustainable production and use of food; embracing a
zero-waste ethos; promoting a green economy and employment and sustainable
procurement decisions and ensuring all planning/design decisions support a sustainable
future.  
It is clear that sustainable development and climate change needs to be a factor in all
decisions made across the Council if SLC are to achieve their goals.   
220

Page 221

The Climate Change and Sustainable Development Committee are tasked with ensuring
sufficient plans are in place; that actions are defined and clearly communicated to those
accountable for contributing to achieving desired changes; that the progress is sufficiently
tracked, and that, most importantly, progress is being made. The challenges and barriers to
achievement need to be fully understood.  The status quo may need to be challenged and
difficult decision made.  
Underlying all of the corporate decisions should be consistent consideration of the actual
implications for the residents and communities in South Lanarkshire, in particular, the
impact of decisions in areas of existing challenge, such as fuel and food poverty or other
areas of inequality and this is recognised in SLC’s strategy and action plan.     
Identification of Key Findings 
 Governance General assurances were obtained re structure, accountabilities etc
supporting the sustainability agenda with no significant issues to note. 
 Risk Management Sustainability risks are reflected in the corporate risks register and top
risk for some Resources as expected. The residual risks scores are very high corporately
and increasing for some Resource risk registers (not decreasing with mitigations, but
residual score going up). Mitigating actions are high level and involve many actions across
the full span of the Sustainability agenda. Over time, how to fund might be one of the
biggest risks.  Mitigating actions are in place but these may need to be revised through
time. 
 Action Plans The review looked at the detailed short and medium term action plans now
in place for next 5 years. Key assurance for 2022/2023 is that the 5-year action plan is now
in place to support the strategy and SLC are also producing annual plans to support the 5-
year plan. All actions should be tracked through IMPROVE and the actions be reflected in
Resource/Service plans. 
Net zero targets Key assurance is that SLC has now set these targets. These represent a
significant undertaking with further work required to establish how indirect emissions not
already measured will be measured. 
Route maps The Council is committed to achieving zero emissions target for direct
emissions for non-domestic buildings, but decisions need to be prioritised. The findings
from the review work taking place are key to developing the route map. Also key, is how it
will be funded and addressing the practical and logistical challenges that will hinder
delivery. 
Decision-making Underlying all of this will be the need to embed cultural change that puts
sustainability and carbon/waste reduction at the forefront of all decision making. 
Collaboration and Community Empowerment Likewise, working in partnership will be
key to addressing issues around fully funding the agenda through to completion. 
221

Page 222

222

Page 223

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee 
Date of Meeting: 27 June 2023 
Report by: Executive Director (Finance and Corporate Resources)    
Subject: 2022 National Fraud Initiative Exercise 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise the Committee of matches resulting from the 2022 National Fraud Initiative
(NFI) exercise and of the proposed target number of investigations to be
undertaken in 2023/2024 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendations:- 
(1) that results of the matching exercise and target number of investigations be
noted. 
3. Background
3.1. NFI is a counter fraud exercise which takes data from councils and other public bodies
and cross matches to identify the potential for fraud. Councils are then informed of the
resulting indicative matches.  It is the responsibility of councils to investigate the data
matches that are identified for their organisation. The Cabinet Office has responsibility
for the NFI throughout the UK however Audit Scotland co-ordinates the exercise within
Scotland.
3.2. South Lanarkshire Council has taken part in the NFI exercise since 2004/2005.  The
full exercise, that takes place every second year, involves Council wide comparisons
including benefits, payroll, creditors, council tax, licences and blue badge holders. 
This data is matched to other benefits and payroll data as well as Department of Work
and Pensions (DWP) deceased persons’ records and the Electoral Register.  Data
extracts from Council systems were submitted by the due dates in 2022. 
3.3. Within South Lanarkshire Council, Internal Audit co-ordinates the NFI exercise and
uploads the relevant data sets. Each Resource is assigned responsibility for
investigating matches relevant to them.  Internal Audit prepared a project plan at the
start of this exercise and will report progress against this to the Council’s External
Auditors on a periodic basis. 
4. 2022 Match Results
4.1. There are 9 separate match areas covered in the 2022 exercise. These are listed in
Appendix 1. 
7
223

Page 224

4.2. South Lanarkshire Council have been provided with a list of matches from the 2022
NFI exercise.  Datasets continue to be refreshed and therefore the number of matches
may change marginally going forward.   
4.3. The totals recorded in Appendix 2 reflect South Lanarkshire Council matches as of 22
May 2023.  At that date, there were a total of 26,036 matches.  A comparison of
matches across the 2020 and 2022 exercises is detailed at Appendix 2. One category
from 2020, relating to COVID-19 grants, was not included in the 2022 exercise.  For
the 9 matches, 5 categories had a decrease and 4 an increase in matches. 
4.4. The greatest decrease in the number of matches relates to Council Tax Reduction
(CTR), namely to Pensions. There was also a reduction in the number of duplicate
creditor payments. 
4.5. The greatest increase in the 2022 NFI exercise is in the number of matches of Single
Person Discount (SPD) to the Electoral Register (which indicates multiple residents). 
The number of blue badges to deceased persons has also increased which may be
reflective of a timing issue.  Work is underway to assess the underlying reasons for
these movements as well as updating records and investigating specific cases. 
4.6. Work to investigate matches identified within the NFI exercise will reflect the review
work that is already ongoing to avoid any duplication and ensure investigation
resources are used effectively. 
4.7. A target number of investigations is determined based on risk and passed to Service
personnel best placed to examine the match.  Internal Audit facilitate and report on the
outcome from the exercise. There is no obligation to investigate every match but the
decision to restrict investigations must be risk based.  In 2022, the target number of
investigations was determined by a number of factors:- 
 those that were denoted as high risk by NFI data analytics
 those that were identified as a key report
 those that were highlighted within the Fraud Report section
 outcomes from previous exercises 
4.8. This resulted in a total of 8,359 ‘high risk’ matches (excluding SPD).  A further risk
analysis was then undertaken by Internal Audit, mainly of Creditor reports to refine
targets further.  A total of 3,065 matches have now been highlighted for investigation. 
A breakdown of the final match targets is provided at Appendix 3.  These targets can
be amended as investigations progress to reflect the outcomes of the reviews and
ensure that resources are directed to areas that are likely to produce the most
significant outcomes.   
4.9.  Investigations have a deadline for investigation of 31 December 2023.  It is anticipated
that most investigations will have been completed ahead of this date and further
updates on progress will be reported to the Committee during 2023/2024.   
4.10. As the Housing Benefit Fraud Section transferred to the DWP Fraud and Error Service
(FES), housing benefit fraud is no longer investigated by the Council.  Initial NFI
investigations still require to be undertaken by the Council and, if this indicates a
potential fraud, the case passed to FES for further investigation.  An outcome will be
recorded through the NFI website once FES have concluded their investigation. This
may result in a delay in closing some investigations.   
224

Page 225

5. Employee Implications
5.1. Internal Audit is responsible for co-ordinating the South Lanarkshire Council exercise
which includes facilitating the issue and receipt of information requests from other
public bodies in relation to NFI cases, undertaking a limited number of investigations
and reporting on employee benefit fraud cases if required. A total of 50 days has been
allocated in the 2023/2024 Internal Audit Plan. Further time can be allocated in
2023/2024 to monitor, investigate and record investigation outcomes as required. 
5.2. In addition to the time allocated by Internal Audit, Resources are also required to
allocate time to investigations. Based on previous years’ exercises, it is anticipated
that the time spent by Resources on investigations will not exceed a total of 50 days. 
6. Financial Implications
6.1. Other than employee time, there is no cost associated with NFI. 
7. Climate Change, Sustainability and Environmental Implications
7.1 There are no implications for climate change, sustainability or the environment in terms
of the information contained within this report.  
8. Other Implications
8.1. Fraud Risk is recognised as one of the top risks facing South Lanarkshire Council. 
This risk is significant as it can adversely affect the delivery of Council objectives and
erode valuable resources.  It is therefore important that the risk of fraud is soundly
managed.   
8.2. The NFI exercise is a valuable counter fraud exercise which has continued to identify
fraud and error within the Council.   
8.3. When a fraud or overpayment occurs, steps will usually be taken to recover the loss.
Services are expected to examine why the loss occurred and demonstrate a change
in their processes and procedures accordingly. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. As the risks associated with the NFI are carried by the Cabinet Office and the Council
is bound by statute to participate, there is no need to undertake a separate equality
impact assessment. 
9.2. Employees and South Lanarkshire Council residents are informed of the
commencement of the NFI exercise through a variety of sources.  There is no
requirement to undertake any further consultation in terms of the content of this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
12 June 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
225

Page 226

Previous References
 Risk and Audit Scrutiny Committee - 2020 National Fraud Initiative Exercise, - 15
September 2021 
 Risk and Audit Scrutiny Committee - 2020 National Fraud Initiative Exercise - 27
September 2022 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Yvonne Douglas, Audit and Compliance Manager
Ext:-  2618 (Tel:  01698 452618)
E-mail:-  yvonne.douglas@southlanarkshire.gov.uk 
226

Page 227

List of “matched” areas in the 2022 NFI Exercise    Appendix 1 
Match area Match between Purpose of Match/Fraud risk
Housing
Benefits (HB) 
HB to Student Loans  To identify individuals claiming benefits, whose
student loan eligibility results in them being
ineligible for those benefits. 
HB to HB (within SLC
and between other
authorities)
To identify an individual that is claiming housing
benefit from one or more local authority at the
same time. 
HB to Housing
Tenants (within SLC
and between other
authorities)
To identify possible tenancy fraud and/or
housing benefit fraud where an individual
appears to be resident at two different
addresses. 
HB to taxi drivers
(within SLC and
between bodies) 
To identify where housing benefit claimants
have failed to declare income that may remove
entitlement to benefit or reduce benefit payable.
HB to CTRS To identify anyone claiming housing benefit and
council tax reduction from one or more local
authority at the same time.
HB to DWP Deceased To identify where a claimant has passed away
and who was in receipt of DWP benefits which
would not have stopped
HB to Waiting List To identify where an individual appears to be
resident at two different addresses as the
address on the waiting list application is
different to the address on the benefit system
Council Tax
Reduction
Scheme
(CTRS)
CTRS to Payroll
(within SLC and
between other bodies) 
To identify where CTRS claimants have failed
to declare income that may remove entitlement
to benefit or reduce benefit payable. 
CTRS to pensions  To identify where CTRS claimants have failed
to declare pension income that might remove
entitlement to benefit or reduce benefit payable. 
CTRS to CTRS (within
SLC and between
other authorities)
To identify an individual claiming CTRS from
one or more local authority. 
CTRS to HB (within
SLC and between
other authorities) 
To identify where an individual is in receipt of
council tax reduction and housing benefit from
one or more local authority simultaneously that
may remove or reduce entitlement to the
reduction.
CTRS to Housing
Tenants (within SLC
and between other
authorities) 
To identify possible cases of tenancy fraud
and/or CTRS fraud where an individual appears
to be resident at two different addresses.
227

Page 228

Match area Match between Purpose of Match/Fraud risk
CTRS to taxi
drivers(within SLC and
between bodies)
To identify where CTRS claimants have failed
to declare income that may remove entitlement
to benefit or reduce benefit payable.
CTR Scheme to DWP
deceased
To identify where a person has passed away
but may be in receipt of CTR after the date of
death
Payroll Payroll to payroll
(within SLC and
between bodies) 
To identify individuals who may be committing
employment fraud by failing to work their
contracted hours because they are employed
elsewhere or are taking long-term sickness
absence from one employer and working for
another employer at the same time. 
Payroll to Creditors To identify employees who are also creditors
where there may be a conflict of interests or
corruption. 
Payroll to Pensions To identify employees who have gone back into
employment after drawing a pension that could
result in an abatement of pension. 
Housing
Tenants (HT)
HT (within SLC and
between bodies) 
To identify where an individual appears to be
resident at two different addresses suggesting
possible cases of subletting or dual tenancies.
HT to HB To identify possible cases of tenancy fraud
and/or housing benefit fraud, where an
individual appears to be resident at two
different addresses.
HT to CTR Scheme To identify possible causes of tenancy fraud
and/or incorrect claims for CTR where an
individual appears to be resident at two
different addresses.
HT to State Benefits To identify possible cases of tenancy fraud
against the organisation i.e. where an individual
appears to be resident at two different
addresses.
HT to DWP Deceased To Identify where the tenant has died, but the
DWP has not been informed.
Waiting Lists Housing Waiting Lists
to Housing Tenants
(within SLC and
between bodies)
To identify where an individual appears to have
registered on the waiting list using a different
address to the one on the housing rents system
suggesting possible undisclosed changes in
circumstances or that false information has
been provided.
Housing Waiting List
to Housing Waiting
List (within SLC and
between bodies)
To identify where an individual appears to have
registered on the waiting list using two different
addresses.
Housing Waiting Lists
to Housing Benefit
Claimants (within SLC
and between bodies)
To identify where an individual appears to have
registered on the waiting list using a different
address to the one on the housing benefit
system.
Waiting List to DWP
deceased
To identify an applicant who has died but is still
shown on the waiting list.
228

Page 229

Match area Match between Purpose of Match/Fraud risk
Blue Badges Blue badge to blue
badge 
To identify individuals who hold more than one
Blue Badge. 
Blue badge to DWP
deceased person
To identify cases where a permit holder has
died, but the local authority may not have been
notified. 
Procurement Procurement – payroll
to Companies House
(Director)
To identify potential undeclared interests that
have given a pecuniary advantage.
Creditors Duplicate creditors by
Duplicate creditor
payments and details
To identify instances where the same supplier
has been recorded against more than one
reference number on the system thus
increasing the potential for creditors to obscure
fraudulent activity.
To identify possible duplicate payments.
VAT overpaid  This test identifies instances where VAT may
have been overpaid. 
Council Tax
Single Person
Discount
Council Tax to
Electoral register
To identify where Single Persons Discount is
being claimed and there is more than one
person aged 18 or over registered within the
property on the Electoral Register. 
Single Person
discount award to
other government
bodies
To identify individuals who have declared they
are living alone but have not declared they are
living with a partner or non-dependant in the
household. 
229

Page 230

Comparison of 2020 and 2022 NFI Exercises     Appendix 2 
2022 2020 Increase/ 
- Decrease Area Total Total
Total Housing Benefits Matches 135 172 - 37
Total Council Tax Reduction Scheme Matches 1,272 2,005 - 733
Total Payroll Matches 159 134 25
Total Tenant Matches 488 685 - 197
Total Waiting List Matches 1,267 1,229 38
Total Blue badge Matches 1,339 1,114 225
Total Creditor Matches 4,488 4,981 - 493
Total Procurement Matches 202 259 - 57
Total Single Persons Discount Matches 16,686 15,126 1560
Total SBGF and RHLG matches 0 238 - 238
Overall matches 26,036 25,943 93 
230

Page 231

Target Investigations         Appendix 3 
Area Total
Target
No.*
Anticipated
Target Date
Total Housing Benefits Matches 135 97 31/12/2023
Total CTRS Matches * 1,272 265 31/12/2023
Total Payroll Matches 159 143 31/12/2023
Total Tenant Matches 488 377 31/12/2023
Total Waiting List Matches * 1,267 217 31/12/2023
Total Blue badge Matches 1,339 1,339 31/12/2023
Total Creditor Matches 4,488 425 31/12/2023
Total Procurement Matches 202 202 31/12/2023
Total Single Persons Discount Matches 16,686 tba 31/12/2023
Total 26,036 3,065 
* This is an interim target.  Depending on outcome and employee resources available, this
number may be increased.
231

Page 232

232

Page 233

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 27 June 2023
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Audit Scotland Report: Resourcing the benefit service – A
Thematic Study 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Risk and Audit Scrutiny Committee (RASC) with a summary of the
Audit Scotland Report ‘Resourcing the benefit service’ – A Thematic Study
released in February 2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[]
(1) that the key messages and recommendations be noted.
[1recs]
3. Background
3.1. The Housing Benefit scheme helps customers pay their rent if they are unemployed,
on a low income, or claiming benefits. It is administered by councils on behalf of the
Department for Work and Pensions (DWP). 
3.2. Since the DWP introduced Universal Credit in 2013, there have been many changes
to councils’ benefit services. As more claims for housing costs were processed by the
DWP, to protect jobs and retain knowledge and expertise, most councils expanded the
remit of the benefit service to carry out other financial assessments such as Free
School Meals, School Clothing Grants, Education Maintenance Awards, and
applications to the Scottish Welfare Fund. 
3.3. With a focus on resourcing and the work of the benefit service in addition to Housing
Benefit claims processing, this study aims to highlight and provide wider context on
the impact on service delivery and performance levels. 
3.4. Audit Scotland invited all 32 Scottish councils to participate in the study by completing
an online questionnaire. South Lanarkshire Council (SLC) was one of 28 councils to
participate in the study. The data and analysis in the Audit Scotland report is based on
questionnaire responses and has not been independently validated, except for claims
processing performance and caseload information, which have been obtained from
DWP published data. 
4. Report Content and Key Messages
4.1. Since 2011, the performance of a council’s Housing Benefit service has primarily been
assessed by Audit Scotland using the DWPs Speed of Processing performance
indicator. This is the average number of days that councils take to process new claims
8
233

Page 234

and change events. The impact on claims processing performance of additional
workloads, resource levels and other activities carried out by benefit service staff have
not previously been considered. 
4.2. It is vital that councils have sufficient resources within the benefit service to manage
increased workloads and staff absences, as customers are often in urgent need of
financial support and avoidable delays in claims processing can seriously impact their
ability to support their household and sustain their tenancy. The report analyses the
resourcing of council benefit services under 5 main headings:- 
 Workloads
 Resources
 Caseloads
 Call handling and personal callers
 Speed of Processing 
Workloads
4.3. This section looks at the breadth of processing activities undertaken by the benefits
service in Scottish councils in 2022/2023 illustrating the difficulty in directly comparing
Housing Benefit claims processing performance based solely on the DWP’s Speed of
Processing indicator, highlighting that:- 
 almost all Scottish councils (27 of the 28 who responded) carry out other
assessment and processing activities in addition to benefit claims processing,
ranging from one additional processing activity to 10
 3 councils carried out 10 additional processing activities within their benefits
service with SLC carrying out 9. The majority of councils carried out 5 or less.
The additional processing activities carried out by the benefits service in SLC are
Free School Meals, Scottish Child Payment (Bridging Payment), School Clothing
Grants, Scottish Welfare Fund, Discretionary Housing Payments, Education
Maintenance Allowance, Blue Badge Scheme, Cost of Living Award and COVID-
19 Self Isolation Support Payments. Since the report the benefits service has
also administered the national energy support schemes to provide financial
support to households who did not receive financial support directly from their
energy provider and households who used alternative fuels. 
4.4. Resources 
This section looks at benefit service staffing levels, sickness absence and flexible
location working arrangements and their impact on benefit processing times
highlighting that:- 
 Across Scotland, benefit staffing levels have reduced by 10% since 2019/2020
against a 26% reduction in the housing benefit caseload suggesting that benefit
service diversification into other financial assessments has helped retain staff. In
SLC the reduction has been 7% and this has been managed through the non-
filling of vacancies.
 The majority of councils (15 of the 25 that provided the required data) were found
to be retaining suitably experienced staff. This is an important factor in
maintaining strong performance as a new benefit officer would require
approximately 18 months of training and support to have sufficient knowledge
and experience to work independently. SLC was one of the 15 councils.
 The most significant factor that can affect a council's Speed of Processing
performance is the availability of staff during the year. Audit Scotland analysis of
2021/2022 found that sickness absence, including leave attributed to COVID-19,
accounted for most staff absences during the year. The sickness absence rate
234

Page 235

across the 25 respondent councils ranged between 1% and 22%. In 14 of the 25
councils (56 per cent) the sickness absence rate was more than double the UK
average of 2.2%. SLC was one of the 14 councils, with sickness absence during
2021/2022 recorded at 6%. COVID-19 was a factor in this rate with SLC having
robust sickness recording procedures in place for absences relating to this. The
report notes that SLC was still able to maintain new claims processing times in
2021/2022.
 The report recognises that flexible location working is now prevalent for benefit
staff since the COVID-19 pandemic. Prior to the pandemic, in 2019/2020, 16
(59%) of the 27 respondent councils’ benefits services were 100% office based,
including SLC. In 2022/2023 none of the 27 councils were 100% office based,
with the vast majority of councils operating a predominantly hybrid working
model, as is the case in SLC. An identified trend from this change in work location
is a reduction in short-term sick leave, with 10 councils, including SLC, seeing a
year-on-year reduction since remote working was introduced.
 To determine the effectiveness of flexible location working on claims processing
times, Audit Scotland compared Speed of Processing performance in 2019/2020
and in 2022/2023 (at 30 June). This highlighted that 21 of the 27 councils (78 per
cent) experienced a decline in new claims processing performance, 24 of the 27
councils (89 per cent) experienced a decline in change events processing
performance, and 19 of the 27 councils (70 per cent) experienced a decline in
both new claims and change events processing performance, when compared to
2019/2020. From an already strong processing performance position, SLC new
claims performance improved by 1 day over the period to 13 days with change
events processing times declining by 1 day to 4 days. The range in processing
times across all 27 respondent councils in 2022/2023 (at 30 June) was between
12 days and 64 days for new claims and 4 days and 13 days for change events. 
Audit Scotland Recommendations:- 
 Where the benefit service is operating below complement, councils should
investigate the reasons for this and seek to address the shortfall, with a view to
improving service delivery and claims processing performance.
 Councils should investigate the reasons for sickness absence levels that are
above the national average and have sufficient contingency arrangements in
place to manage unexpected staff shortages.
 To ensure that benefit services are delivering an optimum level of performance,
management should regularly review flexible location working arrangements to
determine the impact on claims processing performance and service delivery.  
4.5. Caseloads 
This section analyses the impact of caseloads on claims processing, highlighting that:- 
 Claims processing is only part of the work carried out by benefit services that can
affect Speed of Processing performance. Other key factors to consider include
claim complexity and the caseloads attributed to other processing work.
 Claim complexity is dependent on the claim type and the level of additional
information required to assess an application and, therefore, the makeup of a
council’s caseload can impact on average processing times. As an example,
customers living in social rented sector accommodation are not required to
provide the same level of information as a private sector tenant in support of a
claim, as this information can be available from other IT systems. Consequently,
claims from this customer type can take less time to process than claims from
customers in the private rented sector. This is also the case for claimants who
are in receipt of passported DWP benefits e.g. Income Support and Job Seekers
235

Page 236

Allowance (Income based), whose claims are normally quicker to process as they
have an automatic entitlement to Housing Benefit and their income has already
been verified by the DWP. Of 28 councils, Audit Scotland rank SLC’s benefits
caseload 5th least complex.
 Many councils have adapted their benefit service to carry out other financial
assessments as Housing Benefit caseloads have reduced year-on-year. Despite
accounting for a proportion of the service’s resource, and potentially having an
impact on the Speed of Processing indicator, this other work is not considered
when assessing claims processing performance. As highlighted at section 4.3,
SLC’s benefits service carried out 9 additional processing activities including
COVID-19 support payments. The average time taken to process each
application type was not within the scope of this study.  
4.6. Call handling and personal callers 
This section looks at the effect that dealing with customers directly has on available
processing resources. The report highlights that:- 
 In 13 of the 28 councils (46 per cent), benefit officers were responsible for dealing
with telephone enquiries. In SLC, the benefits service has a dedicated call
handling service and, therefore, benefit processors are not required to take calls. 
Recommendation:- 
 When benefit services are primarily responsible for call handling and/or dealing
with personal callers, complete and accurate data should be recorded to allow
management to assess the impact on resources and the time taken to process
Housing Benefit claims. 
4.7. Speed of Processing
The average time taken to process new claims and change events, the Speed of
Processing indicator, has been used by the DWP since 2011 as the key indicator of a
council’s claims processing performance, and is published quarterly on its website. In
this section the report recognises that the work of the benefits service needs to be
considered more holistically to get a better understanding of performance highlighting
that:- 
 Between 2020/2021 and 2022/2023 (as at 30 June), 17 out of 28 councils (61%)
experienced a decline in benefits processing performance for new claims and 24
out of 28 (86%) for change events. This included SLC where performance
declined by 1 day to 13 days for new claims and by 2 days to 4 days for change
events. This is unsurprising given the additional assessment and processing
activities undertaken by council benefits services in addition to benefits
processing as highlighted at section 4.3. SLC processing times still compare
favourably with all other councils ranking 2nd for new claims and 1st for change
events.
 Councils are being innovative, leading to improvements in service delivery and
customer experience. Achieving increased automation of processes is a focus in
many councils to maintain benefit processing performance levels whilst carrying
out additional assessment and processing activities. This is the case in SLC
where automation has been introduced and is now embedded within council tax
for applications for discounts, notification of address changes and setting up
Direct Debits and in relation to clothing grants and free school meals where more
than 80% of awards are made without the need for an application. SLC has also
introduced ‘SMS quick chat’ within the benefits and revenues call centre which
allows the call handler to send the customer an SMS containing a direct link to
236

Page 237

the appropriate online form during the call. This has promoted self-service and
reduced the number of requests for assistance to claim benefits. 
4.8. The Audit Scotland report contains several recommendations which are listed below,
together with an assessment of the position in South Lanarkshire Council:- 
Audit Scotland: - Recommendations SLC position
• Where the benefit service is operating
below complement, councils should
investigate the reasons for this and seek
to address the shortfall, with a view to
improving service delivery and claims
processing performance. 
• Councils should investigate the reasons
for sickness absence levels that are
above the national average and have
sufficient contingency arrangements in
place to manage unexpected staff
shortages. 
• To ensure that benefit services are
delivering an optimum level of
performance, management should
regularly review flexible location working
arrangements to determine the impact
on claims processing performance and
service delivery. 
• When benefit services are primarily
responsible for call handling and/or
dealing with personal callers, complete
and accurate data should be recorded to
allow management to assess the impact
on resources and the time taken to
process Housing Benefit claims. 
The Council continually assesses benefits
resource requirements and priorities
ensuring adequate staffing levels as
demonstrated by continued excellent benefit
processing performance whilst also taking
on additional assessment and processing
activities. 
The Council has robust absence
management procedures, ensuring
absences are effectively managed and
employees receive the support they need.
The councils continued excellent processing
performance demonstrates the
effectiveness of the Council’s contingency
arrangements and the continued focus on
achieving efficiencies. 
The benefits service has a hybrid working
model in operation with dedicated days for
each team to work at home and in the office.
Performance monitoring has highlighted
continued strong benefits processing
performance under this model both in terms
of throughput and accuracy. 
In SLC, the benefits service has a dedicated
call handling service and, therefore, benefit
processors are not required to take calls.
There is, therefore, no impact on the
resources dedicated to processing benefit
claims. 
5. Employee Implications
5.1. There are no direct employee implications. 
6. Financial Implications
6.1. There are no direct financial implications. 
7. Climate Change, Sustainability and Environmental Implications
7.1 There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report.
237

Page 238

8. Other Implications
8.1. There are no other implications. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
9.2. There is no requirement for consultation on the content of the report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
1 June 2023 
Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 We will work to recover, progress and improve 
Previous References
 None 
List of Background Papers
 Audit Scotland Report – Resourcing the benefits service – A Thematic Study 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions)
Ext 4951 (01698 454951)
238

Page 239

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 27 June 2023 
Report by: Executive Director (Finance and Corporate Resources) 
Subject: Forward Programme for Future Meetings 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the forward programme for the meetings of the Risk and Audit
Scrutiny Committee to 11 June 2024
 invite members to suggest topics for inclusion in the Committee’s forward
programme
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the report and the outline forward programme for the meetings of the Risk
and Audit Scrutiny Committee to 11 June 2024, attached as an Appendix to
the report, be noted.
[1recs]
3. Background
3.1. As part of a range of improvement measures introduced as a result of Audit
Scotland’s report on the Audit of Best Value and Community Planning (2009), an
Action Plan was prepared.  One of the actions was to include, as a standard agenda
item, a list of items proposed for consideration at subsequent meetings of this
Committee to provide an opportunity for members to inform future agendas.  The
outline forward programme to 11 June 2024 is attached, for members’ information,
as an Appendix to the report.  
4. Employee Implications
4.1. There are no employee implications. 
5. Financial Implications
5.1. There are no financial implications. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability or Environmental implications in terms
of the information contained within this report. 
7. Other Implications 
7.1. There are no risk implications in terms of the information contained within this report.
9
239

Page 240

8. Equality Impact Assessment and Consultation Arrangements
8.1. The report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
2 June 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee 8 July 2009 
List of Background Papers
 Audit Scotland Audit of Best Value and Community Planning 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elizabeth-Anne McGonigle, Administration Officer
Tel:  0738 5403101
E-mail:-  elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
240

Page 241

APPENDIX – RASC OUTLINE FORWARD PROGRAMME 
Meeting Date Item Responsibility
22 August 2023 Internal Audit Activity Report Audit and Compliance
Manager   
Year End Insured Risks Report
2022/2023
Head of Finance
(Transactions) 
Fraud Statistics Annual Report
2022/2023
Audit and Compliance
Manager   
26 September 2023
(special)
External Auditor’s Annual Report
to South Lanarkshire Council 2022/
2023 
External Audit 
Audited Annual Accounts
2022/2023
Head of Finance (Strategy) 
31 October 2023 Internal Audit Activity Report Audit and Compliance
Manager   
Year End Risk Management Report
2022/2023 and Review of Council’s
Top Risks 2023/2024
Head of Finance
(Transactions)  
Audit Scotland Report – Local
Government in Scotland 2022 
Head of Communications
and Strategy 
30 January 2024 Internal Audit Activity Report Audit and Compliance
Manager   
Performance and Review Scrutiny
Forum Annual Update
Head of Communications
and Strategy  
Fraud Statistics Six Monthly
Update 2023/2024 
Audit and Compliance
Manager
26 March 2024 Good Governance Update 
Internal Audit Activity Report 
2022 NFI Exercise 
2024/2025 Internal Audit Plan
Head of Administration and
Legal Services 
Audit and Compliance
Manager 
Audit and Compliance
Manager 
Audit and Compliance
Manager   
11 June 2024 Internal Audit Assurance Report
2023/2024
Audit and Compliance
Manager   
Annual Governance Statement for Head of Administration and
241

Page 242

2023/2024 and Significant
Governance Areas Quarter 4
Progress Report
Legal Services 
Unaudited Annual accounts
2023/2024
Head of Finance (Strategy)   
Interim Management Report External Audit   
Internal Audit Activity Report Audit and Compliance
Manager   
Audit Scotland – Financial Bulletin
2022/2023
Head of Finance (Strategy)   
Financial Resources Scrutiny
Forum Activity 
Head of Finance (Strategy) 
N.B:-. Audit Scotland national studies and reviews will appear as a recurring item but the
frequency and subject matter will vary according to their programme. 
242