Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 17 October 2022 
Dear Councillor 
Risk and Audit Scrutiny Committee 
The Members listed below are requested to attend a special meeting of the above
Committee to be held as follows:- 
Date:  Tuesday, 25 October 2022
Time:  10:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Elaine McDougall (Chair), Mary Donnelly (Depute Chair), Mathew Buchanan, Alistair Fulton, Ross
Gowland, Celine Handibode, Cal Johnston-Dempsey, Susan Kerr, Richard Lockhart 
Substitutes
Colin Dewar, Gavin Keatt, Monique McAdams, Helen Toner 
1

Page 2

BUSINESS 
1 Declaration of Interests 
Monitoring Item(s) 
2 External Auditor's Report 2021/2022
Report dated 10 October 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
3 - 76 
Item(s) for Decision 
3 Audited Annual Accounts 2021/2022
Report dated 10 October 2022 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
77 - 80 
Item(s) for Noting 
4 Year End Risk Management Report (2021/2022) and Review of Council's
Top Risks (2022/2023)
Report dated 5 October 2022 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
81 - 94 
Urgent Business 
5 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
2

Page 3

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 25 October 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: External Auditor’s Report 2021/2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the External Auditor’s report for 2021/2022 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the attached External Auditor’s Report, be noted. 
[1recs]
3. Background
3.1. The Council’s External Auditors, Audit Scotland, have completed an audit which
extends across the 2021/2022 Accounts and related matters. 
3.2. Members are required to have regard to any report made or advice provided on the
Annual Accounts by the External Auditor. 
3.3. The External Auditor’s Report is appended to this covering paper.  A full contents list
is included in section 4 for ease of reference. 
4. External Auditor’s Report – South Lanarkshire Council 
4.1. As noted in section 3.3, the External Auditor’s report is appended to this covering
paper.  The report itself is preceded by the following documents:- 
 Letter to the Risk and Audit Scrutiny Committee
 Appendix A – Proposed Independent Auditor’s Report
 Appendix B – Letter of Representation (IAS 580)
 Appendix C: Registered charities administered by South Lanarkshire Council
 Appendix D: Proposed independent auditors report – registered charities
administered by South Lanarkshire Council
 Appendix E: Letter of representation – registered charities administered by
South Lanarkshire Council 
4.2. The External Auditor’s report is then attached for members’ consideration.   
5. Employee Implications
5.1. There are no direct employee implications from this report. 
6. Financial Implications
6.1. There are no direct financial implications arising from this report.  
2
3

Page 4

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability or Environmental implications in terms
of the information contained within this report 
8. Other Implications
8.1. The main risk associated with the Council and Charitable Annual Accounts is a
qualified audit report. The risk has been assessed as low due to the detailed
preparation in relation to the year end process, technical training undertaken by key
finance staff and the roll out of this to Resource finance staff as appropriate. Finance
and Resources work together to achieve key deadlines and actions set from
timetables. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
9.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
10 October 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 External Auditor’s Report 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jackie Taylor, Head of Finance
Ext:  5637  (Tel:  01698 455637)
E-mail:  jackie.taylor@southlanarkshire.gov.uk
4

Page 5

8 Nelson Mandela Place
Glasgow 
G2 1BT 
T: 0131 625 1500
E: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk 
Risk and Audit Scrutiny Committee
25 October 2022
South Lanarkshire Council
Audit of 2021/22 annual accounts 
Independent auditor's report
1.  Our audit work on the 2021/22 annual accounts of South Lanarkshire Council and the
registered charities administered by the council (appendix C) is now substantially complete.
Subject to the receipt of a revised set of annual accounts for final review, we anticipate being
able to issue unqualified audit opinions in the independent auditor's report following approval of
the annual accounts by the Risk and Audit Scrutiny Committee on 25 October 2022 (the
proposed reports are attached at appendix A and appendix D). 
Annual audit report
2.  Under International Standards on Auditing in the UK, we report on specific matters arising
from the audit of the financial statements to those charged with governance of a body in
sufficient time to enable appropriate action. We present for the Risk and Audit Scrutiny
Committee’s consideration our proposed annual report on the 2021/22 audit. The section
headed "Significant findings from the audit in accordance with ISA 260" sets out the issues
identified in respect of the annual accounts.
3.  The report also sets out conclusions from our consideration of the four audit dimensions that
frame the wider scope of public audit as set out in the Code of Audit Practice.
4.  This report will be issued in final form after the annual accounts have been certified.
Unadjusted misstatements
5.  We also report to those charged with governance all unadjusted misstatements which we
have identified during our audit other than those of a trivial nature and request that these
misstatements be corrected.
6.  We have no unadjusted misstatements to report. 
Fraud, subsequent events and compliance with laws and regulations
7.  In presenting this report to the Risk and Audit Scrutiny Committee we seek confirmation from
those charged with governance of any instances of any actual, suspected, or alleged fraud; any
subsequent events that have occurred since the date of the financial statements; or material
non-compliance with laws and regulations affecting the entity that should be brought to our
attention.
2
5

Page 6

Representations from Section 95 Officer 
8.  As part of the completion of our audit, we are seeking written representations from the
Executive Director of Finance and Corporate Resources, as Section 95 Officer, on aspects of
the annual accounts, including the judgements and estimates made.
9.  Draft letters of representation in respect of the council and the registered charities are
attached at appendix B and appendix E. These should be signed and returned to us by the
Executive Director of Finance and Corporate Resources together with the signed annual
accounts prior to the independent auditor’s report being certified. 
Concluding remarks
10.  I take this opportunity to record my thanks for the patient and courteous assistance
extended to the audit team. Officers provided good support to the audit team which helped to
ensure that the audit process ran smoothly. 
Fiona Mitchell-Knight FCA 
Audit Director
Audit Scotland 
4th Floor, The Athenaeum Building 
8 Nelson Mandela Place 
Glasgow, G2 1BT  
6

Page 7

Appendix A:  Proposed Independent Auditor’s Report
Independent auditor’s report to the members of South Lanarkshire
Council and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of
South Lanarkshire Council and its group for the year ended 31 March 2022
under Part VII of the Local Government (Scotland) Act 1973. The financial
statements comprise the group and council-only Expenditure and Funding
Analysis, Comprehensive Income and Expenditure Statements, Balance
Sheets, Movement in Reserves Statements, Cash-Flow Statements, the
council-only Housing Revenue Account Income and Expenditure Statement, the
National Non-Domestic Rates Income Accounts Statement, the Council Tax
Income Account Statement, and notes to the financial statements, including
significant accounting policies. The financial reporting framework that has been
applied in their preparation is applicable law and UK adopted international
accounting standards, as interpreted and adapted by the Code of Practice on
Local Authority Accounting in the United Kingdom 2021/22 (the 2021/22 Code).
In my opinion the accompanying financial statements:
• give a true and fair view in accordance with applicable law and the
2021/22 Code of the state of affairs of the council and its group as at 31
March 2022 and of the income and expenditure of the council and its
group for the year then ended;
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2021/22 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland
Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International
Standards on Auditing (UK) (ISAs (UK)), as required by the Code of Audit
Practice approved by the Accounts Commission for Scotland. My
responsibilities under those standards are further described in the auditor’s
responsibilities for the audit of the financial statements section of my report. I
was appointed under arrangements approved by the Accounts Commission on
18 July 2016. The period of total uninterrupted appointment is 6 years. I am
independent of the council and its group in accordance with the ethical
requirements that are relevant to my audit of the financial statements in the UK
including the Financial Reporting Council’s Ethical Standard, and I have fulfilled
my other ethical responsibilities in accordance with these requirements. Non-
audit services prohibited by the Ethical Standard were not provided to the
council. I believe that the audit evidence I have obtained is sufficient and
appropriate to provide a basis for my opinion.
7

Page 8

Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the
preparation of the financial statements is appropriate.
Based on the work I have performed, I have not identified any material
uncertainties relating to events or conditions that, individually or collectively,
may cast significant doubt on the ability of the council and its group to continue
to adopt the going concern basis of accounting for a period of at least twelve
months from when the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the
current or future financial sustainability of the council and its group. However, I
report on the council’s arrangements for financial sustainability in a separate
Annual Audit Report available from the Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of
material misstatement that I identified and my judgements thereon.
Responsibilities of the Executive Director of Finance and Corporate
Resources and the Risk and Audit Scrutiny Committee for the
financial statements
As explained more fully in the Statement of Responsibilities, the Executive
Director of Finance and Corporate Resources is responsible for the preparation
of financial statements that give a true and fair view in accordance with the
financial reporting framework, and for such internal control as the Executive
Director of Finance and Corporate Resources determines is necessary to
enable the preparation of financial statements that are free from material
misstatement, whether due to fraud or error.
In preparing the financial statements, the Executive Director of Finance and
Corporate Resources is responsible for assessing the ability of the council and
its group to continue as a going concern, disclosing, as applicable, matters
related to going concern and using the going concern basis of accounting
unless there is an intention to discontinue the operations of the council and its
group.
The Risk and Audit Committee is responsible for overseeing the financial
reporting process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial
statements as a whole are free from material misstatement, whether due to
fraud or error, and to issue an auditor’s report that includes my opinion.
Reasonable assurance is a high level of assurance, but is not a guarantee that
an audit conducted in accordance with ISAs (UK) will always detect a material
misstatement when it exists. Misstatements can arise from fraud or error and
are considered material if, individually or in the aggregate, they could
reasonably be expected to influence the decisions of users taken on the basis
of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and
regulations. I design procedures in line with my responsibilities outlined above
8

Page 9

to detect material misstatements in respect of irregularities, including fraud.
Procedures include:
• obtaining an understanding of the applicable legal and regulatory
framework and how the council and its group is complying with that
framework;
• identifying which laws and regulations are significant in the context of
the council and its group;
• assessing the susceptibility of the financial statements to material
misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance
with laws and regulations.
The extent to which my procedures are capable of detecting irregularities,
including fraud, is affected by the inherent difficulty in detecting irregularities,
the effectiveness of the council’s controls, and the nature, timing and extent of
the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than
irregularities that result from error as fraud may involve collusion, intentional
omissions, misrepresentations, or the override of internal control. The capability
of the audit to detect fraud and other irregularities depends on factors such as
the skilfulness of the perpetrator, the frequency and extent of manipulation, the
degree of collusion involved, the relative size of individual amounts
manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial
statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of my
auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited
part of the Remuneration Report
I have audited the part of the Remuneration Report described as audited. In my
opinion, the audited part of the Remuneration Report has been properly
prepared in accordance with The Local Authority Accounts (Scotland)
Regulations 2014.
Other information 
The Executive Director of Finance and Corporate Resources is responsible for
other information in the annual accounts. The other information comprises the
Management Commentary, Annual Governance Statement, Statement of
Responsibilities and the unaudited part of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider
whether the other information is materially inconsistent with the financial
statements or my knowledge obtained in the course of the audit or otherwise
appears to be materially misstated. If I identify such material inconsistencies or
9

Page 10

apparent material misstatements, I am required to determine whether this gives
rise to a material misstatement in the financial statements themselves. If, based
on the work I have performed, I conclude that there is a material misstatement
of this other information, I am required to report that fact. I have nothing to
report in this regard.
My opinion on the financial statements does not cover the other information and
I do not express any form of assurance conclusion thereon except on the
Management Commentary and Annual Governance Statement to the extent
explicitly stated in the following opinions prescribed by the Accounts
Commission.
Opinions prescribed by the Accounts Commission on the
Management Commentary and Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration
Report are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my
audit; or
• there has been a failure to achieve a prescribed financial objective.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the
wider scope responsibilities specified in the Code of Audit Practice, including
those in respect of Best Value, are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance
with Part VII of the Local Government (Scotland) Act 1973 and for no other
purpose. In accordance with paragraph 120 of the Code of Audit Practice, I do
10

Page 11

not undertake to have responsibilities to members or officers, in their individual
capacities, or to third parties. 
Fiona Mitchell-Knight FCA 
Audit Director
Audit Scotland 
4th Floor, The Athenaeum Building 
8 Nelson Mandela Place 
Glasgow, G2 1BT
25 October 2022 
11

Page 12

Appendix B: Letter of Representation (ISA 580)
Fiona Mitchell-Knight FCA
Audit Scotland
4th Floor
8 Nelson Mandela Place
Glasgow 
G2 1BT
Dear Fiona,
South Lanarkshire Council
Annual Accounts 2021/22
This representation letter is provided in relation to your audit of the annual accounts of South
Lanarkshire Council and its group for the year ended 31 March 2022 for the purpose of
expressing an opinion as to whether the financial statements give a true and fair view in
accordance with the financial reporting framework, and for expressing other opinions on the
remuneration report, management commentary and annual governance statement.
I confirm to the best of my knowledge and belief and having made appropriate enquiries of the
Chief Executive and Corporate Management Team and the council, the following
representations given to you in connection with your audit of South Lanarkshire Council’s
annual accounts for the year ended 31 March 2022.
General
South Lanarkshire Council and I have fulfilled our statutory responsibilities for the preparation of
the 2021/22 annual accounts. All the accounting records, documentation, and other matters
which I am aware are relevant to the preparation of the annual accounts have been made
available to you for the purposes of your audit. All transactions undertaken by South
Lanarkshire Council have been recorded in the accounting records and are properly reflected in
the financial statements. 
I confirm that the effects of uncorrected misstatements are immaterial, individually and in
aggregate, to the financial statements as a whole. I am not aware of any uncorrected
misstatements other than those reported by you. 
Financial Reporting Framework
The annual accounts have been prepared in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2021/22 (2021/22 accounting code), and in
accordance with the requirements of the Local Government (Scotland) Act 1973, the Local
Government in Scotland Act 2003, and The Local Authority Accounts (Scotland) Regulations
2014.
In accordance with the 2014 regulations, I have ensured that the financial statements give a
true and fair view of the financial position of South Lanarkshire Council and its Group at 31
March 2022 and the transactions for 2021/22. 
Accounting Policies & Estimates
All significant accounting policies applied are as shown in the notes to the financial statements.
The accounting policies are determined by the 2021/22 accounting code where applicable.
Where the code does not specifically apply, I have used judgement in developing and applying
an accounting policy that results in information that is relevant and reliable. All accounting
12

Page 13

policies applied are appropriate to South Lanarkshire Council’s circumstances and have been
consistently applied.
The significant assumptions used in making accounting estimates are reasonable and properly
reflected in the financial statements. Judgements used in making estimates have been based
on the latest available, reliable information. Estimates have been revised where there are
changes in the circumstances on which the original estimate was based or because of new
information or experience.
Going Concern Basis of Accounting
I have assessed South Lanarkshire Council and its group’s ability to continue to use the going
concern basis for accounting and have concluded that it is appropriate. I am not aware of any
material uncertainties that may cast significant doubt on South Lanarkshire Council and its
group’s ability to continue as a going concern
Assets
The assets shown in the books and accounts at 31 March 2022, other than assets which are
employed under finance leases, were owned by South Lanarkshire Council. The assets are free
from any lien, encumbrance, or charge.
For the year ended 31 March 2022, title deeds for properties owned or mortgaged to South
Lanarkshire Council were held by the council and all such deeds were in order.
Where a rolling programme of asset valuations has been used, I have satisfied myself that the
carrying amount of assets at 31 March 2022 does not differ materially from that which would be
determined if a revaluation had been carried out at that date. I have provided you with all
information of which I am aware regarding any valuation exercises carried out after 31 March
2022.
All non-current assets are appropriately classified and there are no known errors in the
valuations of non-current assets in the balance sheet. The net book value in the balance sheet
was arrived at after:
• Taking into account all material capital expenditure on additions but not
expenditure properly chargeable to revenue
• The amounts at which the land and buildings were stated in the balance
sheet were properly calculated in accordance with the approved bases
of valuation and fairly represented the values at 31 March 2022
• Deducting the cost and accumulated depreciation relating to items sold
or scrapped
• Providing for depreciation and obsolescence on bases and at rates
calculated to reduce the net book value of each asset to its estimated
residual value by the end of its probable useful life.
The council’s housing stock was valued on the Existing Use Value – Social Housing (EUV – SH)
using the beacon principle. In my view the valuation approach complies with RICS guidance, it
is in accordance with the 2021/22 accounting code and fairly represents the value of the
housing stock.
The council owns intangible assets in the form of software licenses. Intangible assets have
been separately identified in the balance sheet. Intangible assets have been recognised in
13

Page 14

accordance with the 2021/22 accounting code and IAS 38, as disclosed in note 21 to the
accounts.
All leasing arrangements have been reviewed and correctly classified as operating or finance
within the financial statements. Lease arrangements granted by South Lanarkshire Council
have been correctly classified and disclosed in the financial statements.
In line with the requirements of FRS 30 Heritage Assets, heritage assets are included in the
balance sheet at valuation. As allowed by the 2021/22 accounting code, the basis of valuation is
the declared valuation for insurance purposes or replacement value. There are a number of
heritage assets where obtaining a valuation would involve disproportionate cost and the
2021/22 accounting code permits such assets to be excluded from the balance sheet. 
All long-term debtors and prepayments have been fully provided for in the books of account.
The council’s stocks have been valued at the lower of cost or net realisable value. All
inventories are included in the financial statements.
I carried out an assessment at 31 March 2022 as to whether there is any indication that an
asset may be impaired and have recognised any impairment losses identified.
Liabilities
All liabilities have been provided for in the books of account, including the liability for all
purchases for which title has passed prior to 31 March 2022 and deferred liabilities arising from
the financing of PPP/PFI contracts and other finance leases.
Provisions have been recognised in the financial statements for all liabilities of uncertain timing
or amount at 31 March 2022 of which I am aware where the conditions specified in the 2021/22
accounting code have been met. The amount recognised as a provision is the best estimate of
the expenditure likely to be required to settle the obligation at 31 March 2022. 
Provisions recognised in previous years have been reviewed and adjusted, where appropriate,
to reflect the best estimate at 31 March 2022 or to reflect material changes in the assumptions
underlying the calculations of the cash flows.
Expenditure has only been accrued where it relates to costs incurred prior to the financial year
end.
The accrual recognised in the financial statements for holiday untaken by 31 March 2022 has
been calculated by extrapolating actual costs from a sample of staff. In my opinion the sample
selected is representative of the workforce as a whole.
The pension assumptions made by the actuary in the IAS 19 report for South Lanarkshire
Council have been considered and I confirm that they are consistent with management's own
view.
There are no plans or intentions that are likely to affect the carrying value or classification of the
liabilities recognised in the financial statements.
Contingent liabilities
There are no significant contingent liabilities, other than those disclosed in Note 31 to the
financial statements, arising either under formal agreement or through formal undertakings
requiring disclosure in the accounts. All known contingent liabilities have been fully and properly
disclosed, including any outstanding legal claims which have not been provided under the
2021/22 accounting code and IAS 37. 14

Page 15

Loans Fund
All borrowings are compliant with relevant legislation. The council did not, during 2021/22,
borrow in advance of immediate requirements other than as part of normal treasury
management.
The profiling of the payments included in the annual accounts complies with the reported
accounting policy and relevant statutory guidance.  
Prior year restatement
I confirm that all restatements to correct or update 2020/21 comparative figures in the 2021/22
financial statements have been accurately processed. 
Insurance Fund
In respect of the council’s insurance fund for property, motor and liability insurance, there are no
material unfunded risks.
Other matters
I am not aware of any other matters that require disclosure in order to comply with the
requirements of IAS24, as interpreted by the Code.
Except as disclosed in the financial statements, the results for the period were not materially
affected by:
• Transactions of a sort not usually undertaken by South Lanarkshire
Council
• Circumstances of an exceptional or non-recurrent nature
• Changes or credits relating to prior periods
• Any change in the basis of accounting
Fraud
I acknowledge that it is the responsibility of South Lanarkshire Council to prevent and detect
fraud and other irregularity. I have considered the risk that the financial statements may be
materially misstated because of fraud. I have disclosed to you any allegations of fraud or
suspected fraud affecting the financial statements. There have been no irregularities involving
management or employees who have a significant role in internal control or that could have a
material effect on the financial statements.
Laws and Regulations
I have disclosed to you all known instances of non-compliance or suspected non-compliance
with laws and regulations whose effects should be considered when preparing financial
statements.
Related Party Transactions
All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with the 2021/22 accounting code. I have
made available to you the identity of all the South Lanarkshire Council’s related parties and all
the related party relationships and transactions of which I am aware.
15

Page 16

Remuneration Report
The Remuneration Report has been prepared in accordance with the Local Authority Accounts
(Scotland) Amendment Regulations 2014 and all required information of which I am aware has
been provided to you.
Management commentary
I confirm that the Management Commentary has been prepared in accordance with the
statutory guidance and the information is consistent with the financial statements. 
Corporate Governance
I confirm that South Lanarkshire Council has undertaken a review of the system of internal
control during 2021/22 to establish the extent to which it complies with proper practices set out
in the Delivering Good Governance in Local Government: Framework 2016. I have disclosed to
you all deficiencies in internal control identified from this review or of which I am otherwise
aware.
I confirm that the Annual Governance Statement has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework 2016 and the information is
consistent with the financial statements. There have been no changes in the corporate
governance arrangements or issues identified, since 31 March 2022, which require to be
reflected. 
Group Accounts
I have identified all the other entities in which South Lanarkshire Council has a material interest
and have classified and accounted for them in accordance with the 2021/22 accounting code.
Any significant issues with the financial statements of group entities, including any qualified
audit opinions, have been advised to you.
Common good fund and trust funds
I confirm, to the best of my ability, that all material common good assets have been identified
and correctly accounted for within the common good financial statements. Where appropriate
those common good assets used operationally by the council are recognised as finance leases.
Similarly, all assets, liabilities and revenue transactions relating to trusts administered by the
council have been properly separated from the council’s single entity accounts and are reflected
within the trust fund accounts. 
Events Subsequent to the Date of the Balance Sheet
All events subsequent to 31 March 2022 for which the 2021/22 accounting code requires
adjustment or disclosure have been adjusted or disclosed. 
Yours sincerely 
Paul Manning
Executive Director of Finance and Corporate Resources
South Lanarkshire Council 
16

Page 17

Appendix C: Registered charities administered by South Lanarkshire
Council 
Charity  Scottish charity number
South Lanarkshire Council Charitable Trusts                    SC025089
East Kilbride Information Technology Centre Trust                     SC015221
South Lanarkshire Council Educational Trusts                     SC028135 
17

Page 18

Appendix D: Proposed independent auditors report – registered charities
administered by South Lanarkshire Council
Independent auditor’s report to the trustees of <insert name of
charity> and the Accounts Commission
Report on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the statement of accounts of
<insert name of charity> for the year ended 31 March 2022 under Part VII of the
Local Government (Scotland) Act 1973 and section 44(1)(c) of the Charities and
Trustee Investment (Scotland) Act 2005. The financial statements comprise the
Statement of Receipts and Payments, the Statement of Balances, and notes to the
financial statements, including significant accounting policies. The financial
reporting framework that has been applied in their preparation is applicable law and
a receipts and payments basis.
In my opinion the accompanying financial statements:
•  properly present the receipts and payments of the charity for the year
ended 31 March 2022 and its statement of balances at that date; and
• have been prepared in accordance with the requirements of the Charities
and Trustee Investment (Scotland) Act 2005, and regulations 9(1),(2) and
(3) of The Charities Accounts (Scotland) Regulations 2006.
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards
on Auditing (UK) (ISAs (UK)), as required by the Code of Audit Practice approved
by the Accounts Commission for Scotland. My responsibilities under those
standards are further described in the auditor’s responsibilities for the audit of the
financial statements section of my report. I am independent of the charity in
accordance with the ethical requirements that are relevant to my audit of the
financial statements in the UK including the Financial Reporting Council’s Ethical
Standard, and I have fulfilled my other ethical responsibilities in accordance with
these requirements. I believe that the audit evidence I have obtained is sufficient
and appropriate to provide a basis for my opinion.
Responsibilities of the trustees for the financial statements
The trustees are responsible for the preparation of financial statements that give a
true and fair view in accordance with the financial reporting framework, and for
such internal control as the trustees determines is necessary to enable the
preparation of financial statements that are free from material misstatement,
whether due to fraud or error.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial
statements as a whole are free from material misstatement, whether due to fraud or
error, and to issue an auditor’s report that includes my opinion. Reasonable
assurance is a high level of assurance, but is not a guarantee that an audit
conducted in accordance with ISAs (UK) will always detect a material misstatement
when it exists. Misstatements can arise from fraud or error and are considered
material if, individually or in the aggregate, they could reasonably be expected to 18

Page 19

influence the economic decisions of users taken on the basis of these financial
statements.
Irregularities, including fraud, are instances of non-compliance with laws and
regulations. I design procedures in line with my responsibilities outlined above to
detect material misstatements in respect of irregularities, including fraud.
Procedures include:
• obtaining an understanding of the applicable legal and regulatory
framework and how the charity is complying with that framework;
• identifying which laws and regulations are significant in the context of the
charity;
• assessing the susceptibility of the financial statements to material
misstatement, including how fraud might occur; and
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance with
laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including
fraud, is affected by the inherent difficulty in detecting irregularities, the
effectiveness of the charity’s controls, and the nature, timing and extent of the audit
procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than
irregularities that result from error as fraud may involve collusion, intentional
omissions, misrepresentations, or the override of internal control. The capability of
the audit to detect fraud and other irregularities depends on factors such as the
skilfulness of the perpetrator, the frequency and extent of manipulation, the degree
of collusion involved, the relative size of individual amounts manipulated, and the
seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial
statements is located on the Financial Reporting Council's website
www.frc.org.uk/auditorsresponsibilities. This description forms part of my auditor’s
report.
Reporting on other requirements
Other information 
The trustees are responsible for other information in the statement of accounts. The
other information comprises the Trustees’ Annual Report. 
My responsibility is to read all the other information and, in doing so, consider
whether the other information is materially inconsistent with the financial statements
or my knowledge obtained in the course of the audit or otherwise appears to be
materially misstated. If I identify such material inconsistencies or apparent material
misstatements, I am required to determine whether this gives rise to a material
misstatement in the financial statements themselves. If, based on the work I have
performed, I conclude that there is a material misstatement of this other
information, I am required to report that fact. I have nothing to report in this regard.
My opinion on the financial statements does not cover the other information and I
do not express any form of assurance conclusion thereon except on the Trustees’
19

Page 20

Annual Report to the extent explicitly stated in the following opinion prescribed by
the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Trustees’
Annual Report
In my opinion, based on the work undertaken in the course of the audit, the
information given in the Trustees' Annual Report for the financial year for which the
financial statements are prepared is consistent with the financial statements and
that report has been prepared in accordance with The Charities Accounts
(Scotland) Regulations 2006.
Matters on which I am required to report by exception
I am required by The Charities Accounts (Scotland) Regulations 2006 to report to
you if, in my opinion:
• proper accounting records have not been kept; or
• the financial statements are not in agreement with the accounting records;
or
• I have not received all the information and explanations I require for my
audit.
I have nothing to report in respect of these matters.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with
Part VII of the Local Government (Scotland) Act 1973 and for no other purpose. In
accordance with paragraph 120 of the Code of Audit Practice, I do not undertake to
have responsibilities to members or officers, in their individual capacities, or to third
parties. 
Andrew Kerr CA
Senior Audit Manager
Audit Scotland
4th Floor South Suite
The Athenaeum Building
8 Nelson Mandela Place
Glasgow
G2 1BT
25 October 2022 
Andrew Kerr is eligible to act as an auditor in terms of Part VII of the Local Government (Scotland)
Act 1973.
20

Page 21

Appendix E: Letter of representation – registered charities administered by
South Lanarkshire Council
Andrew Kerr CA
Audit Scotland
4th Floor
8 Nelson Mandela Place
Glasgow 
G2 1BT
Dear Andrew,
South Lanarkshire Charitable Trusts      SC025089
East Kilbride Information Technology Centre Trust    SC015221
South Lanarkshire Educational Trusts                 SC028135
Annual accounts of the registered charities administered by South
Lanarkshire Council 2021/22
This representation letter is provided in connection with your audit of the financial statements of
the registered charities listed above for the year ended 31 March 2022 for the purpose of
expressing an opinion as to whether the financial statements properly represent the financial
position of each of these registered charities as at 31 March 2022 and their receipts and
payments for the year then ended.
I confirm to the best of my knowledge and belief and having made appropriate enquiries of the
trustees of the registered charitable trusts, the following representations given to you in
connection with your audit for the year ended 31 March 2022.
General
I acknowledge my responsibility and that of South Lanarkshire Council, as the administering
authority, for the preparation of the 2021/22 financial statements on behalf of the trustees. All
the accounting records requested have been made available to you for the purposes of your
audit. All material agreements and transactions undertaken by the registered charitable trusts
have been properly reflected in the financial statements. All other records and information have
been made available to you, including minutes of all management and other meetings.
The information given in the Trustees Annual Reports presents a balanced picture of each
charity and is consistent with the financial statements.
I confirm that there are no uncorrected misstatements.
Financial reporting framework
The financial statements have been prepared in accordance with the requirements of Local
Government (Scotland) Act 1973 including all relevant presentation and disclosure
requirements. The financial statements also comply with the requirements of the Charities and
Trustee Investment (Scotland) Act 2005, and The Charities Accounts (Scotland) Regulations
2006 and guidance issued by the Office of the Scottish Charity Regulator (OSCR). 
Disclosure has been made in the financial statements of all matters necessary for them to
properly present the transactions and state of affairs of each charity for the year ended 31
March 2022.
21

Page 22

Accounting policies
The financial statements have been prepared on a receipts and payments basis in accordance
with applicable regulations and the founding documents of each charitable trust. 
Assets
The cash fund and investments shown in the Statement of Balances at 31 March 2022 were
owned by the charities. Assets are free from any lien, encumbrance, or charge. There are no
plans or intentions that are likely to affect the carrying value of classification of the assets within
the financial statements. 
Related party transactions
There were no related party transactions with any party other than South Lanarkshire Council
as administering agent. 
Governance
The business of the charitable trusts is recorded in the systems of South Lanarkshire Council.
As section 95 officer for South Lanarkshire Council, I confirm that there are no issues or
deficiencies in internal control that require to be disclosed within the financial statements of the
charitable trusts.
Fraud
I have considered the risk that the financial statements may be materially misstated because of
fraud or irregularity. There have been no actual or alleged frauds or irregularities involving
trustees or staff of South Lanarkshire Council that could affect the financial statements of the
charitable trusts.
Events subsequent to the balance sheet date
Since 31 March 2022, no events or transactions have occurred which, though properly excluded
from the annual accounts, are of such importance that they should be brought to your notice. 
Yours sincerely 
Paul Manning
Executive Director of Finance and Corporate Resources, South Lanarkshire Council, for and on
behalf of the trustees of the charities administered by South Lanarkshire Council.
22

Page 23

Prepared for the Members of South Lanarkshire Council and the Controller of Audit
October 2022
South Lanarkshire
Council
Proposed 2021/22 Annual Audit Report 
2
23

Page 24

South Lanarkshire Council Proposed 2021/22 Annual Audit Report | 2
Contents 
Key messages 3
Introduction 5
1. Audit of 2021/22 annual accounts 8
2. Financial management 20
3. Financial sustainability 27
4. Governance and transparency 34
5. Best Value 38
Appendix 1: Action plan 49
Appendix 2: Wider dimension risk 52
Appendix 3: National performance reports 53 
24

Page 25

Key messages | 3 
Key messages 
2021/22 annual accounts 
1 Our audit opinions on the annual accounts of the council, its group and the
three section 106 charities administered by the council are unmodified. The
financial statements give a true and fair view and were properly prepared in
accordance with the financial reporting framework. 
2 The management commentary, annual governance statement and
remuneration report were all consistent with the financial statements and
properly prepared in accordance with the relevant regulations and guidance.
3 A significant error has been identified in the accounting for non-current
assets. While the error has now been corrected, procedures need to be
improved to ensure the accuracy of the non-current asset figures in the
2022/23 annual accounts, before they are approved for audit. 
Financial management 
4 Financial management is effective. The Covid-19 pandemic continues to have
a significant impact on the council’s finances. This has been reported to
elected members to ensure they are kept up to date with the impact on
budgets. 
5 Costs relating to the Covid-19 pandemic totalled £36.880 million in 2021/22.
The council received £60.736 million of direct non-recurring funding, and
administered £39.284 million of agency income, provided by the Scottish
Government in 2021/22. At 31 March 2022, £23.856 million of Covid-19
funding was unspent, contributing to the overall budget underspend of
£66.074 million.
Financial sustainability 
6 The council approved a balanced budget for 2022/23. The council will face
continued financial pressures in 2023/24. 
7 Transformational change aligned with effective medium and longer-term
planning is required to address the impacts of the Covid-19 pandemic
together with growing inequalities, cost-of-living pressures, and the changing
needs of citizens. Lessons learned from delivering services differently during
the pandemic should be considered as part of these changes.
25

Page 26

Key messages | 4 
8 The local government pay settlement will add to the future pressures on the
council’s budgets. 
9 Collaborative leadership amongst elected members will be important when
making difficult decisions, to support the council’s recovery from the
pandemic and improve outcomes for its citizens.
Governance and transparency
10 Following the May 2022 local government elections, the council has a new
administration. An effective training programme is in place to support new
and returning elected members.
11 Effective governance and decision-making arrangements were in place
during 2021/22. The council conducts itself in an open and transparent
manner. 
Best Value 
12 The council has taken steps to action all the recommendations from its 2019
Best Value Assurance Report.
13 The council's new Connect Plan sets out clearly its vision and priorities and
this is aligned with its new Community Plan. The priorities focus on people,
progress, and planet. The plan has been developed from residents’ feedback,
identifying their aspirations and needs.
14 The council recognises its role in tackling the climate emergency, with
sustainability embedded in its strategic priorities.
15 Despite the pandemic impacting on service performance in some areas, the
council has achieved or is on track to achieve most of its performance
measures set out in its Connect Plan. 
26

Page 27

Introduction | 5 
Introduction 
1.  This report summarises the findings arising from the 2021/22 audit of South
Lanarkshire Council (the council) and its group. 
2.  The scope of the audit was set out in our 2021/22 Annual Audit Plan
presented to the June 2022 meeting of the Risk and Audit Scrutiny Committee.
This report comprises the findings from: 
• an audit of the annual accounts
• consideration of the four audit dimensions that frame the wider scope of
public audit set out in the Code of Audit Practice 2016 namely, financial
management, financial sustainability, governance and transparency and
value for money.
Responsibilities and reporting
3.  The council has primary responsibility for ensuring the proper financial
stewardship of public funds. This includes preparing annual accounts that are in
accordance with proper accounting practices. 
4.  The council is also responsible for compliance with legislation and putting
arrangements in place for governance and propriety that enable it to
successfully deliver its objectives.
5.  Our responsibilities as independent auditor appointed by the Accounts
Commission are established by the Local Government in Scotland Act 1973, the
Code of Audit Practice 2016 and supplementary guidance, and International
Standards on Auditing in the UK.
6.  As public sector auditors we give independent opinions on the annual
accounts. Additionally, we conclude on:
• the suitability and effectiveness of corporate governance arrangements,
and financial position
• the arrangements for securing financial sustainability
• the effectiveness of the council’s performance management arrangements
and 
• Best Value arrangements. 
7.   Further details of the respective responsibilities of management and the
auditor can be found in the Code of Audit Practice 2016 and supplementary
guidance.
27

Page 28

Introduction | 6 
8.  This report raises matters from our audit. Weaknesses or risks identified are
only those which have come to our attention during our normal audit work and
may not be all that exist. Communicating these does not absolve management
from its responsibility to address the issues we raise and to maintain adequate
systems of control.
9.  Our Annual Audit Report contains an agreed action plan at appendix 1 setting
out specific recommendations, responsible officers, and dates for
implementation. It also includes outstanding actions from last year and the
steps being taken to implement them.
Communication of fraud or suspected fraud
10.  In line with ISA 240, in presenting this report to the Risk and Audit Scrutiny
Committee (RASC) we seek confirmation from those charged with governance
of any instances of actual, suspected, or alleged fraud that should be brought to
our attention. Should members of the RASC have any such knowledge or
concerns relating to the risk of fraud within the council, we invite them to
communicate this to the appointed auditor for consideration.
Adding value through the audit
11.  In addition to our primary responsibility of reporting on the annual accounts
we seek to add value to the council by identifying areas for improvement and by
recommending and encouraging good practice. In so doing, we aim to help the
organisation promote improved standards of governance, better management
and decision making, and more effective use of resources.
Appointment of external auditors 2022/23 to 2026/27
12.  In March 2022, Audit Scotland wrote to the council noting that its external
auditor would remain Audit Scotland for the period 2022/23 to 2026/27. A new
audit team will carry out the audit and we will work closely with them to ensure a
well-managed transition.
New Code of Audit Practice
13.  A new Code of Audit Practice applies to public sector audits for financial
years starting on or after 1 April 2022. It replaces the Code issued in May 2016.
14.  The Code outlines the objectives and principles to be followed by all
auditors. The audit of financial statements is covered by auditing standards, so
the Code focuses more on the wider dimension objectives and responsibilities
of public sector auditors. It is a condition of their appointment by the Auditor
General for Scotland or the Accounts Commission that they follow it.
Auditor Independence 
15.  Auditors appointed by the Accounts Commission or Auditor General must
comply with the Code of Audit Practice and relevant supporting guidance. When
auditing the annual accounts auditors must comply with professional standards
28

Page 29

Introduction | 7 
issued by the Financial Reporting Council and those of the professional
accountancy bodies. 
16.  We can confirm that we comply with the Financial Reporting Council’s
Ethical Standard. We can also confirm that we have not undertaken any non-
audit related services and therefore the 2021/22 audit fee of £521,060 as set
out in our annual audit plan remains unchanged. We are not aware of any
relationships that could compromise our objectivity and independence.
17.  This report is addressed to both the council and the Controller of Audit and
will be published on Audit Scotland's website www.audit-scotland.gov.uk in due
course. 
18.  We would like to thank the management and staff who have been involved
in our work for their cooperation and assistance during the audit. 
29

Page 30

1. Audit of 2021/22 annual accounts | 8 
1. Audit of 2021/22 annual
accounts
The principal means of accounting for the stewardship of resources and
performance 
Main judgements
Our audit opinions on the annual accounts of the council, its group and the three
section 106 charities administered by the council are unmodified. The financial
statements give a true and fair view and were properly prepared in accordance
with the financial reporting framework. 
The management commentary, annual governance statement and remuneration
report were all consistent with the financial statements and properly prepared in
accordance with the relevant regulations and guidance. 
A significant error has been identified in the accounting for non-current assets.
While the error has now been corrected, procedures need to be improved to
ensure the accuracy of the non-current asset figures in the 2022/23 annual
accounts, before they are approved for audit. 
Our audit opinions on the annual accounts of the council and
its group are unmodified 
19.  The annual accounts for the council and its group for the year ended 31
March 2022 are to be approved by the Risk and Audit Scrutiny Committee on 25
October 2022. As reported in the independent auditor’s report:
• the financial statements give a true and fair view and were properly
prepared in accordance with the financial reporting framework 
• the audited part of the management commentary, the annual governance
statement and the remuneration report were all consistent with the
financial statements and properly prepared in accordance with the relevant
regulations and guidance. 
20.  We concluded that there were no matters upon which we are required to
report, by exception, to the Accounts Commission.
30

Page 31

1. Audit of 2021/22 annual accounts | 9 
The annual accounts were signed off in line with the timescales
permitted to reflect Covid-19 
21.  As a result of the continuing impact of Covid-19, Audit Scotland set the
submission deadlines for Local Government audited annual accounts and
Annual Audit Reports at 31 October 2022. 
22.  We received the unaudited annual accounts on 29 June 2022 in line with
the agreed audit timetable. The annual accounts submitted for audit were of a
high standard as were supporting working papers. Finance staff provided good
support to the audit team which helped ensure the final accounts audit process
ran smoothly.
23.  The annual accounts were signed off in line with the revised timetable
permitted to reflect the impact of Covid-19.
Our audit opinions on the annual accounts of the three section
106 charities administered by the council are unmodified
24.  Elected members are trustees for 58 trusts administered by the council.
Each trust has been included in one of three registered Scottish charities:
• South Lanarkshire Council Charitable Trusts: charity number - SC025089
• South Lanarkshire Council Educational Trusts: charity number -
SC028135
• East Kilbride Information Technology Centre Trust: charity number -
SC015221
25.  The trust balances are disclosed in a note in the council’s annual accounts
but do not represent assets of the council so are not included within the cash
and cash equivalents figure shown in the council’s balance sheet.
26.  As a result of the interaction of the Local Government (Scotland) Act 1973
with charities legislation, a full and separate audit and independent auditor’s
report is required for each registered charity irrespective of the value of its
assets. 
27.  Our duties as auditors of the charities administered by South Lanarkshire
Council are to: 
• express an opinion on whether the charity’s financial statements properly
present the charity’s financial position and are prepared in accordance
with charities legislation 
• read the trustees’ annual report and express an opinion as to whether it is
consistent with the financial statements  
• report on other matters, by exception, to the trustees and to the Office of
the Scottish Charity Regulator (OSCR).
31

Page 32

1. Audit of 2021/22 annual accounts | 10 
28.  We have given an unqualified opinion on the annual accounts of the three
charities administered by the council. 
29.  Under International Standard on Auditing (UK) 260 we have one significant
finding from our audit of the East Kilbride Information Technology Centre Trust
to communicate to “those charged with governance”.
30.  We are required to consider whether the funds held within the trusts are
being used for the purposes intended. This includes reporting any inappropriate
use of funds or prolonged lack of activity known as - the public benefit charity
test.
31.  A charity is not failing the public benefit charity test if it is not providing
benefit in any particular year. However, if no benefit is being delivered for an
extended period, then the charity could be considered dormant. 
32.  There has been no charitable activity within the East Kilbride Information
Technology Centre Trust for several years. If a dormant charity has no clear
plans to rectify that, it may be appropriate for us as external auditors to report
this to the OSCR. Management have advised that a proposal will be presented
to trustees in September 2022. This aims to use the Trust’s funds to address
digital exclusion of young unemployed people in the East Kilbride area. The
new auditor will monitor the progress of this proposal as part of their 2022/23
audit. 
Charities recommendation 1
The trustees of the East Kilbride Information Technology Centre Trust should
consider how funds should be used in future to actively achieve its charitable
objective. This could include taking steps to make its existence more widely
known and make applications more accessible.
33.  A proposal to modernise the operation of the South Lanarkshire Council
Charitable and South Lanarkshire Council Educational Trusts was approved by
the Finance and Corporate Resources Committee in April 2018. In December
2019, OSCR approved the modernisation schemes. This has resulted in two
charities being established:
• The South Lanarkshire Charitable Trust: charity number- SC049819
• The South Lanarkshire Educational Trust: charity number- SC049823
34.  The above charities are subject to a separate audit with findings of these
reported to each charities respective Board of Trustees. 
35.  Applications are with OCSR for the transfer of funds from the South
Lanarkshire Council Charitable Trust and South Lanarkshire Council
Educational Trust to the two new charities noted above. In 2021/22 OSCR
approved the transfer of funds totalling £0.045 million from the South
32

Page 33

1. Audit of 2021/22 annual accounts | 11 
Lanarkshire Council Charitable Trusts to the new South Lanarkshire Charitable
Trust. 
There were no objections raised to the annual accounts 
36.  The Local Authority Accounts (Scotland) Regulations 2014 require local
government bodies to publish a public notice on its website that includes details
of the period for inspecting and objecting to the accounts. This must remain on
the website throughout the inspection period. There were no objections to the
2021/22 annual accounts. 
Our audit testing reflected the calculated materiality levels
37.  Materiality can be defined as the maximum amount by which auditors
believe the annual accounts could be misstated and still not be expected to
affect the perceptions and decisions of users of the annual accounts. The
assessment of what is material is a matter of professional judgement. A
misstatement or omission, which would not normally be regarded as material by
value, may be important for other reasons (for example, an item contrary to
law). 
38.  Our initial assessment of materiality for the annual accounts is undertaken
during the planning phase of the audit. On receipt of the unaudited annual
accounts, we reviewed our original materiality calculations and concluded that
they remained appropriate. Our materiality levels are set out at exhibit 1. 
Exhibit 1
Materiality levels 
Materiality levels Council Group
Overall materiality: This is the figure we calculate to assess the
overall impact of audit adjustments on the financial statements. It has
been set at 1% of gross expenditure for the year ended 31 March
2022.
£14.800
million
£14.960
million
Performance materiality: This acts as a trigger point. If the aggregate
of errors identified during the financial statements audit exceeds
performance materiality this would indicate that further audit
procedures should be considered. Using our professional judgement,
we calculated performance materiality at 50% of planning materiality.
£7.400
million 
£7.480
million
Reporting threshold: We are required to report to those charged with
governance on all unadjusted misstatements more than the ‘reporting
threshold' amount. This has been set at 1% of planning materiality.
£0.150
million 
£0.150
million
Source: Audit Scotland 
33

Page 34

1. Audit of 2021/22 annual accounts | 12 
Our audit identified and addressed the significant risks of
material misstatement together with the other areas of audit
focus reported in our 2021/22 Annual Audit Plan
39.  The concept of audit risk is of central importance to our audit approach.
During the planning stage of our audit, we identified two significant risks of
material misstatement which could impact on the annual accounts. Exhibit 2
sets out these risks together with the work we undertook to address them and
our conclusions from this work.
Exhibit 2
Significant risks of material misstatement reported in the 2021/22 Annual Audit Plan
Description of risk  Audit response to risk Results and conclusion
1. Risk of management
override of controls 
International Auditing
Standards require that audits
are planned to consider the
risk of fraud, which is
presumed to be a significant
risk in any audit. This
includes the risk of fraud due
to the management override
of controls.
Assess the design and
implementation of controls
over journal entry
processing.
Make inquiries of
individuals involved in the
financial reporting process
about inappropriate or
unusual activity relating to
the processing of journal
entries and other
adjustments.
Test journals at the year-
end and post-closing
entries and focus on
significant risk areas.
Evaluate significant
transactions outside the
normal course of business.
We will assess any
changes to the methods
and underlying
assumptions used to
prepare accounting
estimates compared to the
prior year.
Results: We assessed the
design and implementation
of controls over journal entry
processing. No significant
issues were noted. 
Management did not identify
any inappropriate or unusual
activity with journals or other
adjustments.
Journal adjustments were
tested, and no indications of
management override of
controls were found. 
We reviewed transactions
during the year - no issues
were highlighted of
significant transactions
outside the normal course of
business. 
Judgements and estimations
applied were tested to
confirm they were
appropriate and reasonable. 
Conclusion: There was no
evidence of management
override of controls from the
work performed. 
34

Page 35

1. Audit of 2021/22 annual accounts | 13 
2. Significant estimation
and judgment: other land
and buildings revaluations 
The council held other land
and buildings, including its
council dwellings, with a net
book value of more than £3.0
billion as at 31 March 2021.
Valuations are based on
specialist and management
assumptions and changes in
these can result in material
changes to valuations. 
Risk: Valuations of these
assets are materially
misstated.
Review the information
provided to the valuer to
assess for completeness.
Evaluate the competence,
capabilities, and objectivity
of the professional valuer.
Obtain an understanding of
management’s involvement
in the valuation process to
assess if appropriate
oversight has occurred.
Critically evaluate the
approach the council has
adopted to assess the risk
that assets not subject to
valuation are materially
misstated and consider the
robustness of that
approach.
Test the reconciliation
between the financial
ledger and the asset
register.
Critically assess the
adequacy of the council’s
disclosures regarding the
assumptions in relation to
the valuation of other land
and buildings and council
dwellings.
Results: We did not identify
any issues with the
information provided to the
valuer.
Our review of the council’s
valuation team’s work
confirmed the
appropriateness of the
methodology and
assumptions used. We did
not identify any non-
compliance with RICS
guidance.
We found that management
have an appropriate level of
involvement and oversight of
the valuation process. 
We concluded that
management’s assessment
that land and buildings not
revalued in 2021/22 are not
materially misstated, to be
reasonable, and found
assumptions made to be
appropriate. 
We did not identify any
issues with the reconciliation
between the financial ledger
and the property asset
register.
We found that appropriate
disclosures have been made
regarding the assumptions
in relation to the valuation of
land and buildings.
Conclusion: No issues
were identified with the
assumptions applied to the
revaluations. 
Source: Audit Scotland 
35

Page 36

1. Audit of 2021/22 annual accounts | 14 
40.  Our 2021/22 Annual Audit Plan also noted other risks of material
misstatement to the annual accounts. Based on our assessment of the
likelihood and magnitude of the risk, we did not consider that these represented
a significant risk. The other areas of audit focus were:
• The estimation and judgement involved in accounting for the pension
liability 
• The accounting for non-current assets 
41.  We kept these areas under review throughout our audit. Other than the
issue noted in exhibit 3 below, there are no significant matters which we need to
bring to your attention.
The council has taken steps to address previous audit recommendations
relating to its accounting for non-current assets, but further improvement is
needed
42.  Over the course of our audit appointment, we identified a number of errors
in the accounting for non-current assets. While the errors identified were
corrected in the accounts, our report last year recommended that the council
reviewed its procedures for accounting for non-current assets.
43.  During 2021/22, an Asset Valuation Working Group was established,
comprising of members of staff from Finance Strategy and Property Services.
The group met four times over the course of the year to discuss and review
capital transactions, including the capital programmes, acquisitions,
revaluations, and transfers between resources. 
44.  In 2021/22 there has been a reduction in the number of non-current asset
accounting issues. However, as reported in exhibit 3, we have identified a
significant error in the processing of council dwellings revaluations. 
Recommendation 1
There should be second officer checks of significant non-current asset accounting
entries. This will help to verify the accuracy of the asset figures in the 2022/23
annual accounts prior to these being submitted to audit. 
Identified misstatements of £128.635 million were adjusted for
in the annual accounts 
45.  We identified misstatements, including misclassifications, with a gross value
of £128.635 million in the unaudited annual accounts. As the total was above
our performance materiality level, we considered the need to revise our audit
approach. 
46.  Management have now adjusted the annual accounts to correct all the
misstatements. These adjustments have contributed to the total comprehensive
net income increasing by £123.016 million, with a corresponding increase in
36

Page 37

1. Audit of 2021/22 annual accounts | 15 
total reserves. Further details of these adjustments are included in exhibit 3 and
paragraph 51.
We have one significant finding to report on the annual
accounts 
47.  International Standard on Auditing (UK) 260 requires us to communicate
significant findings from the audit to “those charged with governance”. 
48.  Our significant finding is summarised at exhibit 3. 
49.  The qualitative aspects of the council’s accounting practices, accounting
policies, accounting estimates and accounts disclosures are satisfactory and
appropriate to the council.
50.  In addition to the issue set out below, and in accordance with normal audit
practice, a number of presentational and disclosure amendments were
discussed and agreed with management.
Exhibit 3
Significant finding from the audit of the annual accounts 
Issue Resolution
1. Valuation of council dwellings
As at 31 March 2022 council dwellings with a
net book value of £1.491 billion were held by
the council. 
As part of our audit testing, we identified an
error in the 2021/22 calculation of the council
dwellings revaluation. 
There was an error in the working paper
provided by Property Services to Finance
Strategy. The workings did not include the
2021/22 increase in the council dwellings
valuation. This error was not identified prior to
processing the accounting entries. 
This resulted in the valuation being
understated by £123.016 million. 
Management have made the necessary
adjustments to the annual accounts. The has
increased the net book value of council
dwellings by £123.016 million. 
Given the material nature of the error, we
considered the need to amend our audit
approach. We were satisfied that the total
error had been identified and no further audit
testing was required. 
To ensure that similar issues do not arise in
the future, we recommend that second officer
checks on significant non-current asset
accounting entries are performed to confirm
their accuracy. 
Appendix 1 – recommendation 1 
Source: Audit Scotland 
37

Page 38

1. Audit of 2021/22 annual accounts | 16 
Other matters identified from our work on the annual accounts
51.  In addition to our finding in exhibit 3 above, the following adjustments to the
annual accounts were identified:
• Accounting treatment of Covid-19 funding: Management identified an
error with the processing of an agency payment amounting to £1.730
million. This had incorrectly been added to both income and expenditure in
error, rather than deducted. As such, income and expenditure within the
Comprehensive Income and Expenditure Statement were overstated by
£3.460 million. This error did not have any net impact on the annual
accounts.
• Asset misclassification: An asset with a net book value of £2.159 million
was reclassified to a surplus asset in the 2021/22 annual accounts. From
our review, and through discussions with management, it was established
that the asset was still operational as at 31 March 2022. Management
agreed to move this asset back to operational other land and buildings in
the audited annual accounts. This classification issue had no net impact
on the Balance Sheet. Appendix 1 – recommendation 1
52.  Management have made the appropriate adjustments for the above. 
53.  Prior to commencing our financial statements audit, management advised
us of an error that they identified with the prior year’s accounts. This was
corrected with a prior year restatement in this year’s accounts totalling £63.379
million. This restatement was needed to correct an error in how the software
was accounting for non-current asset revaluation losses. This issue was
identified by management during an upgrade to the asset system in 2021/22. It
was noted that a number of assets had revaluation losses written off in error.
These losses had already been written off on a prior revaluation. This resulted
in the revaluation reserve being understated by £63.379 million, and the capital
adjustment account being overstated by the same amount.
54.  Management investigated the software error in full by reviewing the original
losses and subsequent revaluations to identify those assets which had losses
written off in error. We reviewed and undertook re-calculations on managements
workings. We are satisfied that the appropriate restatement of 2021/22 opening
balances has been made. 
55.  There was no impact on the council’s usable reserves from this error or the
correcting adjustment. The movement was between the revaluation reserve and
capital adjustment account within the council’s unusable reserves. 
The council applied the statutory override for the accounting
for infrastructure assets included in its property plant and
equipment assets 
56.  The Code of Practice for Local Authority Accounting in the United Kingdom
(the Code) requires infrastructure assets to be measured using the historical
cost measurement basis and carried at depreciated historical cost. Where a
component of an asset is replaced, the carrying amount (i.e., net book value) of
38

Page 39

1. Audit of 2021/22 annual accounts | 17 
the old component shall be derecognised to avoid double counting and the new
component shall be reflected in the carrying amount of the infrastructure asset.
57.  Due to practical difficulties in applying component accounting for the
recognition and derecognition of replaced components of infrastructure assets,
in large part due to data limitations, the Scottish Government approved a
Statutory Override - Accounting for Infrastructure Assets that is applicable to 31
March 2024. The statutory override is formed of two parts:
• Statutory Override 1: For accounting periods commencing from 1 April
2021 until 31 March 2024 a local authority is not required to report the
gross cost and accumulated depreciation for infrastructure assets.
• Statutory Override 2: For accounting periods commencing from 1 April
2010 until 31 March 2024 the carrying amount to be derecognised in
respect of a replaced part of an infrastructure asset is to be taken to be
and accounted for as a nil amount. No subsequent adjustment shall be
made to the carrying amount of the asset with respect to that part.
58.  Where a local authority chooses to adopt either or both statutory overrides,
this should be disclosed within the relevant note to the annual accounts.
59.  South Lanarkshire Council applied both parts of the statutory override in its
2021/22 annual accounts. As part of our audit, we reviewed the infrastructure
assets disclosures and the related notes, including the relevant disclosure in the
accounting policies. We are satisfied that these disclosures reflect the statutory
override and adequately explain the approach adopted to the readers of the
annual accounts.
The council’s 2021/22 management commentary provides a fair
and balanced picture of its performance and operational
activity for the year
60.  Management commentaries included in the annual accounts should provide
information on the council, its main objectives and the principal risks faced. It
should provide a fair, balanced, and understandable analysis of a council’s
performance as well as helping stakeholders understand the financial
statements. 
61.  The council’s management commentary that accompanies the annual
accounts explains how the council has performed against its budget and how
this is reconciled to the financial statements. The impact of Covid-19 on the
2021/22 outturn and reserves position was clearly disclosed. The council has
also included a good level of disclosure on the principal risks it is facing going
forward. This includes details on how the pandemic will continue to be an area
of focus for the foreseeable future, given its impact on all aspects of the
council’s operations. 
62.  In our view, the 2021/22 disclosure represents a fair and balanced
commentary on the council’s performance in 2021/22 and is transparent on the
risks it faces in the coming year. This is presented in a user-friendly format
which makes good use of relevant infographics that help tell the story of the
39

Page 40

1. Audit of 2021/22 annual accounts | 18 
council’s performance in 2021/22 and provide a clear link to the figures in the
financial statements. We welcome the gradual improvements in the structure
and content of the council’s management commentary seen over the course of
our audit appointment. 
The annual governance statement provides a good level of
disclosure on the council’s governance arrangements during
2021/22
63.  The council has a Local Code of Corporate Governance, and this is
reviewed and updated annually. The local code follows the principles set out in
the CIPFA /SOLACE Delivering Good Governance in Local Government:
Framework 2016. The council’s annual governance statement complies with
this guidance and continues to represent good practice.
64.  The statement presents a good explanation and assessment of the
council’s governance arrangements for the year under review. There is
extensive disclosure detailing how each of the principles within the CIPFA
/SOLACE Delivering Good Governance in Local Government: Framework 2016
have been addressed. The impact that Covid-19 on its governance
arrangements in 2021/22 has also been detailed. 
65.  The statement includes disclosure on the council’s level of compliance with
the CIPFA Financial Management Code (the FM Code). The FM Code from
CIPFA applies from 2021/22 and is designed to support good practice in
financial management, with compliance against the principles helping local
authorities demonstrate financial sustainability. The council undertook a self-
assessment against the FM Code during the shadow implementation year,
2020/21. This review identified that the council had fully embedded 14 of 17
criteria as part of its normal business by the end of this shadow implementation
year. The governance statement discloses the following actions to address the
three remaining criteria:
• a detailed financial resilience assessment will be carried out and included
in a future budget strategy paper to be presented in 2022.
• alongside the usual consultation process, key stakeholders will be
included in the development of medium and long-term financial plans. 
• the council’s Options Appraisal guidance and template will continue to be
embedded across the council to help it demonstrate value for money in
decision-making.
66.  CIPFA’s expectation is that authorities will have to comply with all the
financial management standards if they are to demonstrate compliance with the
FM Code. However, the FM Code is not prescriptive about how this is achieved.
We recognise the council’s progress in complying with the principles and
welcome its commitment to achieving the outstanding criteria. 
40

Page 41

1. Audit of 2021/22 annual accounts | 19 
The audited part of the remuneration report was consistent with
the annual accounts and has been prepared in accordance with
applicable regulations
67.  The Local Authority Accounts (Scotland) Regulations 2014 requires the
council to include a remuneration report within its annual accounts that includes
details of:
• the remuneration of relevant persons, including pension entitlements, for
the financial year (and prior year comparator); and accrued pension
benefits figures at 31 March of that year, and
• information on pay bands and the number and cost of exit packages
approved during the financial year.
68.  We have no issues to report in relation to the information included within the
remuneration report in the council’s 2021/22 annual accounts. 
Our audit work addressed the wider dimension risk identified in
our 2021/22 Annual Audit Plan
69.  The Code of Audit Practice 2016 requires auditors to consider the wider
dimensions of public sector audit (financial management, financial sustainability,
governance and transparency and value for money). Within our 2021/22 Annual
Audit Plan, under this responsibility, we identified one wider dimension risk in
relation to:
• Financial sustainability 
70.  Appendix 2 summarises the audit procedures we performed during the year
to obtain assurances over this risk and the conclusions from the work
completed. Further details of our work in relation to the audit dimensions is
included in sections 2 to 5 of this report. 
Progress was made on prior year recommendations but the
accounting for non-current assets still needs to improve
71.  We followed up on actions agreed in our 2020/21 Annual Audit Report, to
assess what progress on implementation had been made. Details of the follow
up are included in appendix 1. 
41

Page 42

2. Financial management | 20 
2. Financial management
Financial management is about financial capacity, sound budgetary
processes and whether the control environment and internal controls
are operating effectively.
Main judgements
Financial management is effective. The Covid-19 pandemic continues to have a
significant impact on the council’s finances. This has been reported to elected
members to ensure they are kept up to date with the impact on budgets. 
Costs relating to the Covid-19 pandemic totalled £36.880 million in 2021/22. The
council received £60.736 million of direct non-recurring funding, and administered
£39.284 million of agency income, provided by the Scottish Government in
2021/22. At 31 March 2022, £23.856 million of Covid-19 funding was unspent,
contributing to the overall budget underspend of £66.074 million. 
The pandemic significantly impacted on many aspects of
council’s finances in 2021/22, with £23.856 million of unspent
Covid-19 funding contributing to the overall budget
underspend of £66.074 million
72.  Over the course of our audit appointment, we have consistently reported on
the council’s sound financial management. It has a well-established budget
process in place and a history of delivering services within budget. 
73.  The council approved its 2021/22 revenue budget of £751.793 million
(£795.527 million net of specific grants of £43.734 million) in February 2021.
The council had moved on from the immediate emergency response of year
one of the pandemic, but at the time of setting its 2021/22 budget it had to
continue to respond to Covid-19. This included managing pandemic restrictions
and providing support to its community, while also recovering services and
planning its recovery and renewal in a complex and uncertain environment. To
support councils in this, the Scottish Government provided further in year
funding. The response, and funding in support of this, have had an impact on
the council’s 2021/22 budget, with this reflected in the budget movement across
the year. 
74.  At the February 2022 meeting of the Executive Committee, the probable
outturn for 2021/22 was reported as being an underspend of £54.430 million
before taking account of the transfers to reserves of £49.636 million. These
transfers to reserves included transfers relating to the Pupil Equity Fund (£3.500
million), underspends against non-specific Covid-19 funding (£15.600 million),
42

Page 43

2. Financial management | 21 
Covid-19 specific funding for education recovery (£3.011 million) and the loans
fund payment rescheduling review (£13.550 million). Members agreed that the
remaining underspend of £4.794 million would be transferred to reserves to
meet the cost of Covid-19 recovery moving forward. 
75.  In its 2021/22 annual accounts, the council reported an actual underspend
of £66.074 million, prior to any transfers to reserves, against its revised revenue
budget for 2021/22 of £851.666 million. The main movements, between the
probable outturn reported in February to the position reported in the annual
accounts, relate to lower than anticipated expenditure on Covid-19 costs. This
resulted in a further increase in the Covid-19 underspend of £5.234 million.
There was also an underspend of £2.051 million reported on core funding from
the council to the South Lanarkshire Integration Joint Board. This was in part
attributable to underspends with the external care at home provision, arising
from staff capacity, recruitment, and retention issues, together with underspends
in residential respite. The use of the respite service had not returned to pre-
pandemic levels due to self-isolation rules around Covid-19. The £2.051 million
will be held in in the council’s reserves and utilised to manage pressures within
Children and Family Services. 
76.  The budget evolved during the year as additional funding was released,
which included additional Covid-19 funding. The 2021/22 costs of Covid-19
recovery have primarily been managed with funding (£26.185 million) from
reserves carried forward from 2020/21. This means that elements of the new
funding received in 2021/22 have again been carried forward to meet the costs
of recovery in 2022/23. A total of £23.856 million in relation to Covid-19 was
transferred to reserves at the year-end. The reserves position is discussed
further at paragraphs 127 to 131 of this report. 
77.  These budget revisions, and transfers, resulted in an actual outturn
underspend of £6.109 million. As part of the final outturn review, in June 2022
the Executive Committee approved the transfer of this underspend to reserves.
These funds are to be used in the 2023/24 revenue budget strategy.
78.  The changes in the budget position were reported in revenue budget
monitoring reports presented to the Executive Committee throughout the year.
These reports contained a good level of detail on the forecast outturn position,
as well as details on the costs of Covid-19 and the funding received in support
of this.
Costs relating to the Covid-19 pandemic totalled £36.880 million
in 2021/22
79.  The 2021/22 financial year was the second full year of the pandemic. The
council continued to incur various costs because of this. These included the
costs of recovering from the various stages of lockdown and the loss of income
from services being closed or suspended. Exhibit 4 highlights the cost of Covid-
19 to South Lanarkshire Council in 2021/22. These costs were met from Covid-
19 funding carried forward from 2020/21, together with further funding received
in year. 
43

Page 44

2. Financial management | 22 
Exhibit 4
Summary of significant Covid-19 costs 
Area £’million Further comment
Additional resource spend £32.596 Includes costs related to education
recovery, PPE, and IT equipment.
The council was also responsible
for making payments to assist
families during lockdown, including
free school meals and winter
clothing payments. 
Lost income £3.625 Lockdown impacted on income
generating services such as
planning applications and parking.
Unspent budget (£0.541) Primarily relates to the reduced
need for food purchases, including
breakfast and holiday lunch clubs. 
Capital spend  £1.200 Revenue funding used to cover
Covid-19 capital costs. 
Total Covid-19 expenditure  £36.880 
Source: South Lanarkshire Council 2021/22 annual accounts and Revenue Budget Outturn
2021/22 report 
The council received £60.736 million of direct non-recurring
funding, and administered £39.284 million of agency income,
provided by the Scottish Government, to alleviate the impact of
the pandemic on individuals, businesses, and the economy
80.  The impact on public finances of the Covid-19 pandemic has continued into
2021/22. This has necessitated ongoing support from the Scottish and UK
governments for public services as well as support for individuals, businesses,
and the economy. South Lanarkshire Council received £60.736 million in Covid-
19 related funding in 2021/22 (£68.190 million in 2020/21). This was used to
offset costs noted in exhibit 4. The unspent Covid-19 funding of £23.856 million
was transferred to the council’s general reserve. This will be used to manage
the ongoing budget pressures resulting from the pandemic in 2022/2023.
81.  Throughout 2021/22 the council has played a key role in supporting
individuals and families through the financial burden of the pandemic. This
included facilitating support for: 
44

Page 45

2. Financial management | 23 
• those self-isolating
• provision of free school meals
• funding for education recovery
82.  The council was responsible for administering £39.284 million to local
applicants as part of the various business support grant schemes. Due to grant
conditions, these business support funds are considered to represent an
agency agreement. Agency payments are those paid out by the council on
behalf of another organisation, in this case the Scottish Government. As such,
the £39.284 million does not appear in the council’s annual accounts, except for
being appropriately disclosed in its management commentary. 
83.  We reviewed the council’s accounting treatment for each of the grants
against the applicable guidance and concluded that the council had classified,
and where required, correctly accounted for the grants in its 2021/22 annual
accounts.
An underspend of £2.917 million was reported against the
Housing Revenue Account (HRA) budget
84.  The council reported a £2.917 million underspend against the HRA budget
for 2021/22. The underspend was primarily due to the over recovery of income
because of higher than anticipated rental income. 
85.  The £2.917 million underspend was transferred to the Housing Revenue
Reserve. In addition, income of £0.540 million was received in council tax from
owners of second homes. Taken together, this has increased the reserve from
£12.784 million in 2020/21 to £16.241 million in 2021/22.
86.  As reported to the Executive Committee in September 2022, as at period
five of 2022/23, the council is reporting a breakeven position on its HRA budget. 
The pandemic impacted upon the delivery of the 2021/22 capital
programme 
87.  The Executive Committee approved the 2021/22 capital programmes in
June 2021. At the time, the general services programme for 2021/22 totalled
£85.066 million, with the housing capital programme originally amounting to
£94.360 million. 
General services programme 2021/22
88.  At each meeting of the Executive Committee, capital programme monitoring
reports are presented to members. Throughout the year these reports detailed
the various movements in the general services programme budget. The
December 2021 and February 2022 monitoring reports detailed the largest
movements in the budget across the year. There were reductions of £5.167
million and £5.877 million reported, respectively. The pandemic was noted as
being the main factor behind these reductions, with material shortages and
longer lead times impacting on the supply chain. For any project where delivery
45

Page 46

2. Financial management | 24 
timelines have slipped, the council has committed to deliver these, with the
projects included in a future year’s capital programme as appropriate.
89.  At the June 2022 Executive Committee, the general services outturn capital
programme spend was reported as £61.587 million for 2021/22, against a final
budget of £72.732 million. This represents slippage of 15 per cent against the
revised budget (slippage of 13 per cent in 2020/21). 
Housing capital programme 2021/22
90.  At the Executive Committee’s September 2021 meeting, the housing
services capital budget was revised down to £79.640 million from the original
budget of £94.360 million. This was due to a review of the council’s new build
housing programme, with proposals approved to move projects totalling
£14.720 million into the 2022/23 financial year. These movements reflected
revised timescales and estimated completion dates across several sites that
had been impacted by planning delays because of the pandemic.
91.  The housing capital programme outturn was reported as £73.181 million for
2021/22, against the revised budget of £79.640 million. This represents
slippage of 8 per cent against the revised budget (spend was 2.5 per cent
greater than budget in 2020/21). Alongside the impact of the pandemic, the
underspend was also impacted by the lower than anticipated buy backs due to
market conditions. The council had set an initial target of increasing its housing
stock through buy back by 30 units at the start of 2021/22. After an in-year
review by management, this was raised to an aspirational target of 60 houses.
The council acquired 55 units in 2021/22.
92.  It is important that the council addresses any slippage caused by the
pandemic, challenges in the construction industry and other economic factors.
In its Local Government in Scotland: Overview 2022 report the Accounts
Commission highlighted the important role of capital investment in councils’
recovery from the pandemic. In particular, there is a need for investment to be
aligned with plans to tackle the impact of climate change, with modernisation of
councils’ estates needed to ensure carbon reduction targets are achieved. The
importance of investment in this area is something the council has recognised in
its recently published Sustainable Development and Climate Change Strategy
(discussed further at paragraphs 159 to 166). 
2022/23 capital budgets
93.  The council approved the 2022/23 capital programmes in February 2022.
The general services programme for 2022/2023 originally totalled £82.284
million, with the housing capital programme amounting to £52.230 million. 
94.  At the Executive Committee meeting in June 2022, revisions were made to
the general services programme, with the slippage from 2021/22 and additional
funding received, added to the programme budget to give an updated budget of
£99.534 million for 2022/23. A further slight revision down to £97.057 million
was agreed at the September 2022 Executive Committee meeting. 
95.  At the August 2022 meeting, revisions were made to the housing capital
programme bringing this to £66.361 million. This increase of £7.311 million
reflects the expenditure on new build homes at East Whitlawburn. 
46

Page 47

2. Financial management | 25 
96.  As at period five of 2022/23, £14.420 million (15 per cent) of the revised
general services budget and £16.150 million (24 per cent) of the revised
housing capital programme budget has been spent. The delivery of both
programmes of work in 2022/23 will be subject to regular review and scrutiny by
the Executive Committee.
Internal controls operated effectively during 2021/22
97.  As part of our 2021/22 audit, we tested the key controls operating over the
main accounting systems. Our objective was to gain assurance that the
systems for processing and recording transactions provide a sound basis for the
preparation of the annual accounts. 
98.  Our controls work did not identify any significant risks of material
misstatement, with the internal controls providing a sound basis for the
preparation of the annual accounts. 
Internal audit provided a reasonable level of assurance over the
council’s risk management, control, and governance
arrangements in place during 2021/22
99.  The internal audit service, in any organisation, is an important element of
internal control. It provides members and management with independent
assurance on risk management, internal control and corporate governance
processes as well as providing a deterrent effect to potential fraud. 
100.  We found the council’s internal audit to be operating effectively, and in line
with the Public Sector Internal Audit Standards (PSIAS) requirements. 
101.  PSIAS require the provision of an annual internal audit opinion, to inform
the council's annual governance statement. The Audit and Compliance Manager
issued her Annual Assurance Report to the Risk and Audit Scrutiny Committee
in June 2022 which included the opinion that: reasonable assurance can be
placed on the adequacy and effectiveness of the council’s framework of
governance, risk management and control arrangements for the year ending 31
March 2022. 
The council has in place appropriate arrangements for the
prevention and detection of fraud and corruption
102.  The council has a range of established procedures for preventing and
detecting fraud and irregularity including a whistleblowing policy, anti-fraud
strategy and codes of conduct for members and officers. 
103.  The council continues to participate in the National Fraud Initiative (NFI).
This is a counter-fraud exercise across the UK public sector which aims to
prevent and detect fraud. For the 2021/22 exercise, the council reviewed all
higher risk matches by the target date of 31 March 2022. The council’s
arrangements for investigating and reporting data matches identified by the NFI
are satisfactory. 
47

Page 48

2. Financial management | 26 
104.  We have concluded that the council has appropriate arrangements in
place for the prevention and detection of fraud and corruption. We are not
aware of any specific issues we require to bring to your attention.
The council is replacing its core HR/Finance systems
105.  The council’s current HR/Finance system, Oracle E-Business Suite (EBS),
has been in place since 1999. This version will no longer be supported by
Oracle after December 2023. At the September 2021 meeting of the Finance
and Corporate Resource Committee, members were presented with a range of
options and approved the upgrade of the HR/Finance systems to Oracle Fusion.
It is anticipated that moving to the new system could result in cashable savings
of £2.253 million being realised by 2024/2025. These savings will come from
efficiencies created in using the new system. For example, costs will be saved
through the replacement of the current online learning, flexi, and recruitment
systems. The expected go live date for the new system is April 2023.
106.  The council has in place a project plan for the new system. This includes a
timeline for the data migration. As with any major change in financial systems,
there is an increased risk of misstatement or error when transferring over
figures and balances. Progress with the project will be kept under review by the
new audit team.
48

Page 49

3. Financial sustainability | 27 
3. Financial sustainability
Financial sustainability looks forward to the medium and long term to
consider whether the council is planning effectively to continue to
deliver its services or the way in which they should be delivered
Main judgements
The council approved a balanced budget for 2022/23. The council will face
continued financial pressures in 2023/24. 
Transformational change aligned with effective medium and longer-term planning
is required to address the impacts of the Covid-19 pandemic together with
growing inequalities, cost-of-living pressures, and the changing needs of citizens.
Lessons learned from delivering services differently during the pandemic should
be considered as part of these changes. 
The local government pay settlement will add to the future pressures on the
council’s budgets. 
The initial 2022/23 budget gap was £54.403 million 
107.  The Executive Director of Finance and Corporate Resources presented a
report to the council’s Executive Committee in June 2021. The report estimated
the 2022/23 budget gap, before corporate solutions, at £54.403 million. The
report included several options, approved by the Committee, to address the
funding gap. These included the temporary use of reserves from the council’s
prior year’s loans fund payment rescheduling review (£27.400 million) and an
assumed increase in council tax equating to income of £4.882 million. The total
savings package resulted in a revised budget gap of £9.417 million.  
The council approved a balanced budget for 2022/23 
108.  The council approved its 2022/23 revenue budget of £827.916 million
(£871.025 million net of specific grants of £43.109 million) in February 2022. To
balance the 2022/23 budget, the council had to identify saving solutions to
address the remaining budget gap of £9.417 million. The profile of some of
these permanent savings is such that £3.235 million will not be realisable until
after 2022/23. As such temporary solutions were required to balance the budget
for 2022/23, with these relating to underspends that management anticipated
would be available against the budget for loan charge interest repayments. 
109.  The final 2022/23 grant settlement resulted in an improved funding
position of £6.328 million when compared with the June 2021 budget strategy
49

Page 50

3. Financial sustainability | 28 
update. However, there were several additional costs identified, such as the
increase in national insurance contributions (£3.500 million), which when
applied to the improved settlement resulted in a benefit of £1.828 million. To
achieve a balanced budget for 2022/23, members agreed to utilise this
remaining funding. For example, £0.928 million has been set aside to deal with
the inflationary pressures on the council’s secondary school public-private
partnership contracts. 
The council’s 2022/23 budget includes one-off funding to
support local initiatives. Additional funding received has also
been used to limit the impact of council tax increases for
citizens
110.  Following the above grant settlement, the Scottish Government, in its
Stage 2 Budget Bill, allocated further one-off funding of £120 million to local
authorities. The council’s share of this was £7.042 million. Councils were given
flexibility to allocate this additional funding as they sought fit in 2022/23.
111.  As part of its 2022/23 budget, the council agreed to use £5.652 million of
this funding to continue its investment in community projects and initiatives. This
includes £0.800 million to support communities deliver on their identified
priorities including initiatives to reduce social isolation and provide health and
wellbeing activities. £2.500 million has been identified to support a programme
of pavement and footpath repairs with the aim of making communities safer.
112.  The remaining £1.400 million was used to reduce the proposed 3.5 per
cent council tax increase to 2.5 per cent. Members recognised that any
reduction in council tax would likely increase the potential budget gap for future
years. However, it was felt that this action was needed to support households in
2022/23 given the current cost of living pressures. 
113.  The council considers such investments to be an important aspect of its
role in helping its citizens and local businesses recover from the impacts of the
pandemic, with the provision of these funds also aligning to its Community
Wealth Building and Economic strategies (see paragraphs 167 to 171).
114.  The local government pay settlement for 2022/23 is still to be determined
but once agreed, this will add to the future pressures on the council’s budgets.
The Scottish Government is consulting with COSLA on a range of potential
funding options that could reduce the impact on council’s budget for the year.
The council are currently considering the various options available to it.
Management will report the financial implications of this pay award to the
council’s Executive Committee. 
The council will face continued financial pressures in 2023/24.
Lessons learned from delivering services differently during the
pandemic should be considered to help address the estimated
£24.726 million budget gap 
115.  At the council meeting in June 2022 management advised that the budget
gap, before any corporate solutions, for 2023/24 was estimated at £37.541
50

Page 51

3. Financial sustainability | 29 
million. This excludes any change to council tax. This figure is made up as
follows:
• Core budget items - £22.221 million
• Exceptional budget items - £15.320 million
116.  The core budget impact relates to items that the council expects will need
addressing year-on-year, for example pay awards (£8.834 million) and
reductions in its grant settlement (£6.360 million). The exceptional budget items
arise due to the current economic climate and the impact of inflationary
increases. As such, the council estimates significant increases in utilities
(£7.450 million) and fuel (£1.650 million) costs. Corporate solutions of £5.064
million were identified, primarily relating to efficiencies. This left a budget gap of
£32.477 million. 
117.  At the September 2022 meeting of the Executive Committee, members
were informed that the savings requirement for 2023/24 had been revised down
to £24.726 million. This decrease was primarily due to a more favourable than
budgeted indicative financial settlement following the Scottish Government’s
May 2022 Spending Review together with the council’s share of the national
£120 million funding issued to local authorities. 
118.  Whilst work is ongoing to seek solutions to address this gap, the council
recognises that the extent of the budget gap is greater than those efficiencies
delivered in previous years. To that end, the council should take the opportunity
to learn from decisions made on delivering services differently, in response to
the pandemic, to help inform how best to use its resources. The council, its
partners and communities worked together at speed during this time to provide
support, and deliver services, showing that collaboration is possible. This
experience should be used to consider different approaches to service delivery. 
Transformational change aligned with effective medium and
longer-term planning is required to address the impacts of the
Covid-19 pandemic together with growing inequalities, cost-of-
living pressures, and the changing needs of citizens
119.  There remains uncertainty over the longer-term funding position for
councils. In its Local Government in Scotland: Overview 2022 report, the
Accounts Commission reports that councils have seen their underlying
cumulative funding fall by 4.2 per cent in real terms since 2013/14 (excluding
Covid-19 funding). Other analysis indicates that when funding for Scottish
Government priority areas is removed there has been a real terms reduction of
9.6%. This contrasts with an increase of 4.3 per cent in Scottish Government
funding of other areas of the budget over the same period. 
120.  This funding reduction is against the backdrop of a range of new
challenges facing councils, including decisions on what services to reinstate
and redesign, and to what level, following the Covid-19 pandemic. There is a
need for councils to develop long-term plans with their stakeholders to address
complex issues such as child poverty, inequalities and deliver on Scotland’s net
zero ambitions. This is all set in the context of a challenging economic climate. 
51

Page 52

3. Financial sustainability | 30 
121.  The council provided feedback to the Scottish Government’s call for views
on the 2023/24 Scottish budget. In its response the council acknowledged the
unprecedented financial pressures faced by local government and noted that
any further reductions in budgets would have severe implications for councils’
ability to deliver services. It commented that this would, in turn, impede councils’
ability to support the Scottish Government’s priorities together with the
achievement of national outcomes. 
122.  Multi-year allocations were not included in the Scottish Government’s
2022/23 budget. As such, the funding position beyond 2022/23 is particularly
uncertain, with all councils working to a one-year grant settlement. Whilst
recognising that this funding model makes it challenging for councils to plan and
budget effectively for the medium and longer term, the development of longer-
term plans is necessary to help council’s plan for and deliver better outcomes
and to address inequalities. 
123.  The council has published a new council plan (see paragraphs 154 to
158). In developing this, it engaged with citizens to help it establish what
services were important to, and valued by, its communities. This feedback was
used to inform the plan and will feed into the council’s strategic budget planning
processes going forward.
124.  At the Executive Committee meeting in September 2022, management
advised members of a combined savings requirement, after corporate solutions
(e.g., use of reserves) but before council tax increases, for 2023/24 to 2027/28
of £100.192 million, exhibit 5. 
Exhibit 5
Identified savings requirement 2023/24 to 2027/28 
2023/24 2024/25 2025/26 2026/27 2027/28 Total
Savings
required 
£’million
£24.726 £31.979 £27.215 £5.202 £11.070 £100.192
Source: Budget Strategy – 2023/2024 Update and Longer-Term Financial Outlook
125.  As the uncertainty created by Covid-19 diminishes, medium and longer-
term financial plans will need to be revised by all councils to take account of
their overarching recovery strategies. This will ensure a cohesive approach to
recovery and renewal of services.
126.  The council should identify where it can progress transformational change
in how its services are delivered. This should identify where recurring savings,
rather than temporary solutions, can be made together with proposals to reduce
costs. This, combined with robust longer-term financial plans, will be key to
maintaining financial sustainability. 
52

Page 53

3. Financial sustainability | 31 
Recommendation 2
The council should identify where it can progress transformational change in how
services are delivered to address the longer-term financial pressures it faces.
There was a £6.366 million net increase in usable reserves 
127.  In 2021/22 there was a net increase of £6.366 million in the council’s
usable reserves, with the total now sitting at £152.186 million, exhibit 6. Within
the general fund reserve the most significant movements were in relation to
Covid-19 funding. The council utilised £26.185 million of funding carried forward
from 2020/21, with unspent funding of £23.856 million transferred into the
reserve in 2021/22. This brings the total Covid-19 funding held in the reserve to
£30.061 million. Over the past two years Covid-19 funding has been the main
contributor to the increase in the council’s overall usable reserve position. The
other significant movement in the 2021/22 general reserve was in relation to
earmarked funds held for future budget strategies. This reserve saw a net
increase of £13.365 million in 2021/22, bringing the total held to £33.671 million. 
Exhibit 6
South Lanarkshire Council usable reserves 
Reserve 31 March 2020
£’million 
31 March 2021
£’million
31 March 2022
£’million
General fund  £75.579 £116.980 £122.424
Housing revenue account £9.713 £12.784 £16.241
Repair and renewal fund £5.918 £7.484 £6.496
Capital fund £10.327 £6.268 £5.730
Insurance fund  £2.053 £2.304 £1.295
Total usable reserves  £103.590 £145.820 £152.186
Source: South Lanarkshire Council annual accounts 2019/20 to 2021/22
128.  The council’s general fund reserve includes an unearmarked balance of
£17.198 million, with £4.155 million of this being approved for future budget
strategies and £13.043 million uncommitted. Against an expenditure budget of
£834 million for 2022/2023, this unearmarked element represents a 2 per cent
reserve. Management considers that this level of reserve reflects a suitable
contingency to contribute towards any unanticipated pressures. The remainder
of the general fund reserve, £105.226 million, is earmarked for specific
53

Page 54

3. Financial sustainability | 32 
purposes such as Early Years (£14.465 million), Covid-19 recovery costs
(£30.061 million) as well as being used to manage the savings requirements
across specific future budget years (£33.671 million). 
129.  Over the course of our audit appointment the current balance of £152.186
million represents the highest level the usable reserves have been at. However,
consideration of the wider context in which the council is operating in helps to
explain this. The Accounts Commission’s Local Government in Scotland:
Overview 2022 report highlighted that the increase in 2020/21 revenue reserves
across most councils was largely because of additional Covid-19 funding. South
Lanarkshire Council saw a significant increase in its usable reserves in 2020/21
(£32.390 million of which related to Covid-19 funding) with a further increase in
its reserve position in 2021/22, exhibit 6. The Commission recognised that this
funding had artificially inflated reserve positions, with councils unlikely to have
flexibility in the use of large elements of these reserves. This is evident from
review of the council’s total usable reserves, with Covid-19 earmarked monies
equating to 19.8 per cent (£30.061 million) of the total usable reserves. 
130.  There are ongoing sustainability challenges of using reserves to fund
recurring expenditure, particularly as recovery and renewal from the pandemic
is progressed. This is factored into the current budget strategy. Beyond that,
difficult decisions will need to be taken in the future, with a clear plan and
effective management of the council’s reserves key to maintaining financial
sustainability. 
131.  Members should ensure they are satisfied with management’s proposals
and rationale for the planned use of reserves. 
The Scottish Government’s proposals for a new National Care
Service have the potential to significantly change the way that
social care services are structured and operate 
132.  Following the publication of the Independent Review of Adult Social Care
in February 2021, work is currently under way nationally to develop and
implement a new National Care Service (NCS). The Scottish Government
expects the new NCS to be operational by 2026. These proposals have the
potential to significantly change the way that social care services are structured
and operate. 
133.  In its January 2022 Social Care briefing Audit Scotland noted stakeholders
concerns about the extent of the proposals for reform and the time it will take to
implement them. Many of the current issues experienced by the social care
sector, for example workforce pressures, cannot wait for the Scottish
Government to implement a new NCS. 
134.  In its formal response to the national consultation on the NCS proposals,
the council highlighted similar points to those identified in the Audit Scotland
national report. Whilst supportive of the opportunity to discuss improvements to
users experience of social care services, the council highlighted the
consultations absence of any context for the current system and the underlying
causes that have produced the negative outcomes experienced by many
stakeholders. In its response the council also set out several areas for urgent
54

Page 55

3. Financial sustainability | 33 
action that it considered would result in more efficient and effective
improvements, rather than the proposed wholesale structural reform being
proposed. 
135.  Management have committed to providing members with updates as the
proposals develop over the coming year. One such update was provided to the
Executive Committee in August 2022. This noted the council’s contribution to
the consolidated response from COSLA to the Scottish Parliament’s call for
evidence to the new National Care Service Bill.
55

Page 56

4. Governance and transparency | 34 
4. Governance and
transparency
The effectiveness of scrutiny and oversight and transparent reporting of
information 
Main Judgements
Following the May 2022 local government elections, the council has a new
administration. An effective training programme is in place to support new and
returning elected members. 
Effective governance and decision-making arrangements were in place during
2021/22. The council conducts itself in an open and transparent manner. 
Following the May 2022 local government elections, the council
has a new administration  
136.  Following the local government elections in May 2022, 64 members
representing the 20 multi-member wards were elected across South
Lanarkshire. The political composition is as follows:
• Conservative - 7
• Green - 1
• Labour - 24
• Liberal Democrats - 3
• Independent - 2
• Scottish National Party – 27
137.  In May 2022, at the first meeting of the new council, a Labour-led
administration was put in place succeeding the Scottish National Party who led
the council in the preceding five years. 
138.  The Local Government (Scotland) Act 1973 allows councils to delegate
decision-making to committees or sub-committees. There is no requirement for
councils to adopt a particular decision-making and scrutiny structure; it is a
matter for each council to decide what is most appropriate for its circumstances
and context. The new council approved the same decision-making structure as
56

Page 57

4. Governance and transparency | 35 
had been used for the previous administration. Essentially this means that all
committees and forums report to the council through an Executive Committee,
exhibit 7. 
Exhibit 7
South Lanarkshire Council decision-making process 
Source: South Lanarkshire Council 
The council has put in place an effective training programme to
support new and returning elected members 
139.  The Scottish local government elections were held in May 2022. Since the
local government elections in May 2022, both newly elected and returning
members have taken part in a number of training courses, including a
comprehensive induction programme. This comprised of welcome sessions,
outlining members’ key roles and responsibilities as councillors together with
specific training on areas such as risk and audit awareness training. The council
has put in place an ongoing training plan with this updated as required during
the year. The plan includes access to a library of Learn on Line material which
cover a wide range and variety of courses to help develop members skills.
57

Page 58

4. Governance and transparency | 36 
140.  Members have a responsibility to take advantage of the training
opportunities provided to ensure that they have the skills required to effectively
fulfil their scrutiny and challenge roles.
The challenging context in which the council is operating
means collaborative leadership is more important than ever if it
is to support recovery from the pandemic and improve
outcomes for its citizens
141.  In its Local Government in Scotland: Overview 2022 report the Accounts
Commission is clear that following the Covid-19 pandemic councils need to
build back differently, not simply roll back services to pre-pandemic ways of
working. To achieve this, strong leadership from councils is needed. The
council’s new and returning councillors should be willing and able to make
difficult decisions about where and how to spend its resource, with a willingness
and ability to embrace collaborative working within the council and with external
stakeholders critical to achieving this.
142.  The council has shown a desire for collaboration. At the September 2022
meeting of the full council there was cross-party agreement on the proposals to
support citizens through the cost-of-living crisis by creating warm spaces across
the council area to help those struggling during this time. 
143.  We encourage members and senior officers at the council to maintain an
open and collaborative culture. This will help drive improvement and innovation
at the council which will in turn will lead to better outcomes for its citizens. 
Effective governance and decision-making arrangements were
in place during 2021/22 
144.  Members and management of the council are responsible for establishing
arrangements to ensure that its business is conducted in accordance with the
law and proper standards, that public money is safeguarded together with the
monitoring of the adequacy and effectiveness of these arrangements. 
145.  During our audit appointment we have consistently reported that the
council has in place appropriate arrangements to support good governance and
accountability. As explained further in paragraphs 63 to 66 we are of the view
that governance arrangements remained effective in 2021/22.
The council conducts its business in an open and transparent
manner 
146.  There is evidence from several sources which demonstrate the council’s
commitment to openness and transparency:
• The agendas, papers and minutes of committee meetings are published
on the council’s website on a timely basis. 
• The council makes its annual accounts available on its website. These
include a management commentary which adequately explains the
council’s financial performance for the year.
58

Page 59

4. Governance and transparency | 37 
• Its website also provides the public with access to a wide range of
corporate information including details of the council’s corporate plan,
performance information, and equality and diversity reporting.
147.  During 2021/22 the council held committee meetings virtually using
Microsoft Teams. These meetings were livestreamed which helped to maintain
public accessibility to council committee business. The council has made
recordings of meetings available on its YouTube page. Going forward the
council intends to operate a hybrid model for meetings, giving members and
officers the opportunity to attend meetings in person whilst also accommodating
those who wish to attend remotely. 
148.  Overall, we remain of the view that the council conducts its business in an
open and transparent manner.
Relevant national performance audit reports are considered by
the council
149.  Audit Scotland carries out a national performance audit programme on
behalf of the Accounts Commission and the Auditor General for Scotland.
During 2021/22, Audit Scotland published several reports which are of direct
interest to the council. These are outlined in appendix 3. 
150.  During 2021/22 we noted that relevant national reports, including the Local
government in Scotland: Financial overview 2020/21 and the impact of Covid-19
on Scottish councils' benefit services reports, were taken to the Risk and Audit
Scrutiny Committee for consideration. These were accompanied by
supplementary information explaining how the findings and recommendations
relate to the specific circumstances of South Lanarkshire Council. We welcome
this positive response to the national reports. 
59

Page 60

5. Best Value | 38 
5. Best Value 
Using resources effectively and continually improving services.
Main judgements
The council has taken steps to action all the recommendations from its 2019 Best
Value Assurance Report. 
The council's new Connect Plan sets out clearly its vision and priorities and this is
aligned with its new Community Plan. The priorities focus on people, progress,
and planet. The plan has been developed from residents’ feedback, identifying
their aspirations and needs. 
The council recognises its role in tackling the climate emergency, with
sustainability embedded in its strategic priorities. 
Despite the pandemic impacting on service performance in some areas, the
council has achieved or is on track to achieve most of its performance measures
set out in its Connect Plan. 
The council has taken steps to action all the recommendations
from its 2019 Best Value Assurance Report 
151.  The Best Value Assurance Report (March 2019) (BVAR) for South
Lanarkshire Council reported that the council has strong leadership, clear
direction, a strong culture of continuous improvement and concluded that it is a
well performing council. “We are pleased to note the council continues to
demonstrate all of these elements and is making significant progress in fulfilling
its duty of Best Value, and outcomes are improving for citizens.” 
152.  The BVAR contained ten improvement recommendations, in areas
including how community engagement is used to shape services, the role of the
Community Planning Partnership Board and the need for elected members to
review their training needs. Our work in 2019/20 and 2020/21 concluded that
the council had achieved four of these, with progress having been made on the
other six recommendations. 
153.  Our work this year has focused on following up on the six
recommendations that were still open from last year, exhibit 8. By its very nature
Best Value is a continuous process. Whilst we have concluded that the council
has put in place arrangements to address all the recommendations, we
welcome its commitment to progressing these further, for example, through its
updated Connect Plan and associated strategies.
60

Page 61

5. Best Value | 39 
Exhibit 8
Progress against BVAR recommendations 
BVAR recommendation  Audit Scotland view on progress to date
1. To increase the impact of the council’s
efforts in achieving its strategic objectives,
links between the council plan (Connect Plan)
and the LOIP (Community Plan) should be
made clearer with a sharper focus on the key
areas of activity. Locality plans should be
prepared without further delay.
Complete
The new Connect Plan for 2022-2027 was
published in June 2022. The new plan has
three priorities: people, progress, and planet.
These are in line with the three key ambitions
outlined in the new Community Plan 2022-
2032 which was also published in June 2022.
These plans have been designed as
companion publications and share the same
vision, priorities, and outcomes. 
Ongoing
To date, eight neighbourhood plans have
been published, with a further three in
progress.
2. Elected members need to improve the
public scrutiny of key decisions, performance,
and financial reports.
Ongoing
Management have advised that the overall
level of scrutiny has improved over the last
Council term. 
Work is ongoing to provide newly elected
members, including those on the Risk and
Audit Scrutiny Committee, with training to
assist them in their scrutiny and challenge
role. 
Member engagement and scrutiny will be an
area of focus for the new audit team. 
3. Members should, with the assistance of the
personnel service, review their personal
training and development needs and agree a
plan to ensure that they have the skills
required to effectively fulfil their scrutiny and
challenge roles.
Complete
Since the local elections in May 2022, elected
members have undertaken a comprehensive
training and induction programme, covering
key areas to enable them to fulfil their
scrutiny and challenge roles. 
Members also have access to a library of
“Learn on Line” courses which cover a wide
range and variety of courses to develop
members skills. A training plan for the
remainder of the financial year is in place
which will support members in effectively
carrying out their roles (see paragraphs 139
to 140 for further details).
61

Page 62

5. Best Value | 40 
4. Management should review arrangements
for assessing resident satisfaction, to ensure
these are providing meaningful data to help
shape future services.
Complete
Since January 2020, the Organisational
Development Team have carried out 941
surveys. Of these, 116 relate to customer
satisfaction. The results of these surveys
inform decisions taken on future services of
the council.
5. The Community Planning Partnership
Board should take a more active role in
driving partnership working, monitoring
outcomes, and feeding back to thematic
subgroups.
Complete
The Community Planning Partnership Board
is well developed and is providing oversight
and driving partnership working. The Board
has established a number of groups to
promote partnership working such as:
• The Community Planning Outcomes Leads
Group
• The Partnership Community Participation
Engagement Group
• The Community Planning Communications
Group
• The Community Partnership Website
Review Group 
The Board has also recently worked with
North Lanarkshire Community Planning
Partnership to identify shared priorities for
action. 
6. Management should implement revised
arrangements for community engagement to
improve how it is used to shape services.
Consistent and high-quality consultation
across all services should be part of this.
Complete
The Community Participation Engagement
Group oversaw the engagement activity
around the new Connect and Community
Plans which were built from the communities
up using engagement to identify resident’s
views and aspirations.
‘Community Conversation’ focus groups took
place, involving more than 200 residents.
This was the largest consultation carried out
to date by the council and added to a body of
existing knowledge that had already emerged
from community events and work developing
neighbourhood plans. 
Source: Audit Scotland 
62

Page 63

5. Best Value | 41 
The council's new Connect Plan sets out clearly its vision and
priorities. The priorities focus on people, progress, and planet.
The plan has been developed from residents’ feedback,
identifying their aspirations and needs 
154.  The new council Connect Plan for 2022-2027 was published in June 2022.
This is the key strategic document that shapes the work of the council. It sets
out the outcomes to be delivered over the next five years and is supported by a
long-term vision of core values and priorities.
155.  The new plan makes clear the council’s vision to “improve the lives and
prospects of everyone in South Lanarkshire” and its three priorities; People;
Progress and Planet.
156.  The Plan has been built from communities up, using engagement to
identify resident’s views and aspirations. Over 3,500 residents took part in the
initial survey with around 200 taking part in follow-up focus groups to help
identify the key priorities. This is the largest consultation carried out to date by
the council and has added to a body of existing knowledge from previous
engagement with residents. 
157.  Alongside its three priorities, the plan outlines the council’s six key
outcomes:
• Communities and environment
• Education and learning
• Health and wellbeing
• Children and young people
• Housing and land
• Our economy
158.  The outcomes have clear goals of what their achievement will look like.
This will allow the performance and progress of each outcome to be measured.
The council’s Performance and Review Scrutiny Forum will receive updates on
the progress of this new plan twice a year.
The council recognises its role in tackling the climate
emergency, with sustainability embedded in its strategic
priorities 
159.  At a full council meeting in September 2019, the council recognised the
seriousness of the climate emergency that had been declared nationally and
made a commitment to help address this at a local level. The council approved
its new Sustainable Development and Climate Change Strategy 2022-2027 in
June 2022. This follows on from the 2017-2022 version. The new strategy aims
to tackle climate change over the medium-term and provides a broad strategic
direction for longer-term planning.
63

Page 64

5. Best Value | 42 
160.  The council sought views from a range of stakeholders to help it shape the
strategy. This involved holding community engagement focus groups with
citizens together with workshops that included council officers, community
planning partners, and elected members. From the issues that were discussed
during the public engagement four key themes emerged, exhibit 9. These
themes align with the priorities of the council’s new Council Connect Plan 2022
- 2027. The council’s plan recognises the importance of addressing the climate
emergency and setting actions to achieve net zero. As reported in the Accounts
Commission’s Local Government in Scotland: Overview 2022 report,
commitments such as this will contribute to councils’ overall recovery and
renewal from the pandemic.
161.  The strategy contains 13 priorities with one of these being the
achievement of net zero by 2045. The council aims to achieve this in an
equitable way that does not exacerbate existing inequalities. It recognises the
achievement of these priorities will be challenging particularly given the rural
and urban diversity of the council.
162.  The council is working on an action plan which will detail how it will
achieve these aims and objectives, and how they link to the 13 priorities noted
in the strategy. The action plan will look at longer term objectives as well as
detailing annual measures. 
Exhibit 9
Sustainable Development and Climate Change Strategy 2022-2027 key themes 
Source: South Lanarkshire Council: Sustainable Development and Climate Change Strategy
2022-2027
64

Page 65

5. Best Value | 43 
163.  The council’s Climate Change and Sustainability Committee is responsible
for overseeing the progress with the strategy, including consideration and
scrutiny of the action plan measures aligned to it. These will be reported twice
each year to the committee. 
164.  In 2021/22 the council’s internal audit function undertook a review of the
work to develop this new strategy. The review concluded that the council has a
definitive plan in place albeit this needs to be developed and adopted. The
financial implications of delivery were noted as was the need to ensure that
sustainability was embedded into all decision making.
165.  In the Audit Scotland Auditing Climate Change 2021 report and the
Accounts Commission’s September 2022 briefing on Scotland’s councils’
approach to addressing climate change, it was noted that while public bodies,
including councils, have declared a climate emergency, there is a need to
ensure the robustness of plans. The plans should include greater clarity on how
targets and timescales will be achieved. The reports also reaffirmed the
important role that citizens will have and the need for strong partnership
working. The council recognises the need to build on its strategy. It has
committed to the preparation of an action plan that will detail how the statutory
requirements, including net-zero will be achieved. It has also committed to
working with stakeholders to establish a more joined up and collaborative
approach to tackling climate change.
166.  Whilst recognising the amount of work and investment required to achieve
net zero, there is a clear commitment from the council to work towards this
target. The council has embedded sustainability into its key plans and
strategies. It has established a separate Committee to scrutinise progress in
this area and combined, this gives climate change a level of prominence and
focus within the council. 
The Community Wealth Building commission has undertaken
significant work throughout the year to progress the council’s
Community Wealth Building Strategy
167.  The council approved a Community Wealth Building (CWB) Strategy in
March 2021 and subsequently the CWB Commission was set up to engage a
wide range of partners and stakeholders in the CWB agenda. 
168.  In August 2021, the commission approved an action plan for delivery of
the CWB strategy which contained a range of actions over a three-to-five-year
timeframe, setting out how the aspirations of the strategy could be progressed
for each of the five key areas of CWB:
• Spending
• Workforce
• Land and property
• Finance and building
65

Page 66

5. Best Value | 44 
• Generative economy
169.  The 2021/22 annual report was presented to the CWB commission in June
2022. This highlights the progress over the first year and provides examples of
significant work under each of the five key areas:
• Changes to the council’s Quick Quote process have enabled the council to
use this route for more contracts and to make it more accessible for local
suppliers. 
• The living wage campaign group ran a successful event in November
2021 promoting the benefits of paying the living wage, including
presentations from employers and employees. South Lanarkshire has now
reached over 100 Living Wage accredited employers. 
• Throughout 2021/22, a total of 582 additional properties were made
available for social rent across South Lanarkshire.
• Strategies to boost South Lanarkshire town centres have been developed,
covering Hamilton, Cambuslang, Larkhall and Blantyre.
• A new Small Business Support Grant has been introduced and Business
Gateway has been resourced to pilot the offer of a new start up grant.
170.  The South Lanarkshire Economic Strategy and Action Plan was published
in June 2022. This sets out the council’s ambitions and actions for growth over
the next five years. This links with the priorities of the CWB strategy and seeks
to promote inclusive growth and maximise opportunities across the council’s
communities to deliver on the CWB ambitions. 
171.  The Accounts Commissions Local Government in Scotland: Overview
2022 highlights that those experiencing inequality have felt the impacts of both
the pandemic and service disruption most strongly over the past two years.
However, initiatives such as CWB are recognised as being a good example of
new ways in which councils can support local economic development and tackle
poverty. In this regard, we welcome the council’s adoption of CWB as it aims to
create a fairer, more socially just economy for its citizens. 
Despite the pandemic impacting on service performance in
some areas, the council has achieved or is on track to achieve
most of its performance measures set out in its Connect Plan 
172.  Each of the council’s five resource directorates are required to produce an
annual resource plan. These plans provide an overview of the resource
directorate’s main areas of activity, summarise service achievements in the
previous year, and set out plans for maintaining and improving services in the
year ahead. A total of 264 measures were identified from these resource plans.
From the 2021/2022 resource plans 108 measures were identified as key
strategic measures for reporting progress against the Connect Plan.
173.  The council’s performance against resource measures is reported to the
appropriate resource committee and performance against corporate measures
66

Page 67

5. Best Value | 45 
is reported to the Performance and Review Scrutiny Forum. Progress reports
submitted to the Forum include a summary of performance against measures
for each of the council’s Connect Plan objectives, along with details of the main
achievements for that objective. 
174.  The Connect quarter four progress report for 2021/22 reports that of the
council’s 108 strategic performance measures, 89 (82%) had been achieved or
were on target for completion. Of the remaining measures, two experienced
significant issues. These were:
• The percentage of total household waste that was recycled: The target
was 50%. The actual achieved was 41.5%. Covid-19 was reported as
being the main factor in the target not being achieved. 
• To increase settled accommodation by converting 40 temporary
accommodation units to Scottish Secure Tenancies by March 2022: Only
21 units were converted by March 2022. Post Covid-19 priorities to
maintain levels of temporary accommodation have prevented the target
from being met. However, this will be prioritised in year four of the
council’s Rapid Rehousing Transition Plan. 
175.  Performance management and reporting is well established within the
council. This provides members the opportunity to scrutinise the council’s
performance against its strategic objectives. Despite the ongoing service
pressures caused by the pandemic, the council has maintained a strong level of
performance.
The council’s overall performance per national benchmarking
is comparable to its prior year results but is down slightly when
compared with the Scottish average 
176.  The council participates in the Local Government Benchmarking
Framework (LGBF). The framework brings together a wide range of information
about how all Scottish councils perform in delivering services, including the cost
of services and how satisfied citizens are with them. The council notes that the
use of the LGBF allows it to self-assess its performance across years, and to
compare performance with peers against an agreed suite of performance
indicators, which will assist in achieving best practice and efficiencies. 
177.  The most recent National Benchmarking Overview Report 2020/21 by the
Improvement Service was submitted to the council’s Performance and Review
Scrutiny Forum in August 2022 along with a council specific action plan. When
comparing the indicator’s reported, the council’s overall performance has
remained consistent with its own prior year performance but is slightly down
when compared to the Scottish average. Details of the council’s trend over the
past three years against these performance indicators can be seen at exhibit
10. 
67

Page 68

5. Best Value | 46 
Exhibit 10
South Lanarkshire Council analysis of LGBF results 
Number of
indicators (%)
2018/19  
Number of
indicators (%)
2019/20 
Number of
indicators (%)
2020/21  
South Lanarkshire Council
performance   
Improving performance in SLC 34 (38%) 35 (39%) 36 (38%)
Declining performance in SLC 34 (38%) 45 (49%) 36 (38%)
No change in performance in SLC 3 (3%) 1 (1%) 2 (2%)
Information not available 18 (21%) 10 (11%) 21 (22%)
Comparison with Scottish
Average   
SLC results better than Scottish
average
44 (49%) 42 (46%) 37 (39%)
SLC results worse than Scottish
average
28 (32%) 39 (43%) 37 (39%)
SLC results the same as Scottish
average
3 (3%) 0 (0%) 0 (0%)
Information not available 14 (16%) 10 (11%) 21 (22%)
Source: Performance and Review Scrutiny Forum (August 2022) and LGBF 2021/22
178.  Across the 95 indicators in 2020/21, the council’s performance has
improved against 36 (38%) and declined against 36 (38%). In terms of the
council’s figures relative to the Scottish average, performance was better than
Scottish average for 37 (39%) indicators. This is a decrease on the prior year
results of 46%.
179.  The reason for this decline is specific to each indicator. The council has an
improvement action plan for all the indicators, including those reported as being
below the Scottish average. The council also undertakes family group analysis,
which focuses on those indicators performing worse than the Scottish average.
This aims to group councils into a “family group” of councils with similar levels of
deprivation and urban profiles, providing better context to the results.
180.  The council recognises the usefulness of the LGBF in generating
discussion about performance and improvement in councils. However, as
discussed below, it has recently engaged with the Improvement Service to
68

Page 69

5. Best Value | 47 
develop a bespoke approach which aims to refine reporting on these national
indicators in a way that has specific relevance to South Lanarkshire Council.
The council is working collaboratively with the Improvement
Service to develop a subset of indicators which align with the
outcomes of its new Connect Plan
181.  The council engaged with the Improvement Service in 2021/22 to look at
how it uses and reports on the Local Government Benchmarking Framework
(LGBF). This aimed to produce a suite of refined indicators that the council
could use to better reflect its priorities and allow for scrutiny on its identified
improvement areas. The collaboration follows concerns raised by the council,
over a number of years, with the way several aspects of the LGBF are currently
reported. 
182.  In December 2021, the Improvement Service provided a bespoke analysis
of LGBF indicators for the council, structured around the council’s new Connect
Plan. Each of the council’s resources considered which LGBF indicators added
value for inclusion in a subset of indicators for future reporting. Of the 95 LGBF
indicators, 33 have been identified as aligning with the outcomes of the
council’s new Connect Plan. These will be embedded within the Connect Plan’s
reporting and will be used to focus attention on how well the council is
performing in achieving its strategic outcomes. 
183.  To complement the reporting of this strategic LGBF suite, the council has
committed to reviewing the indicators against its current performance reporting
arrangements. For example, those LGBF indicators relating to housing could be
reported, at a relevant time, alongside the council’s other performance
information in this area to provide additional context and allow for richer
discussion on the council’s performance in this resource. 
184.  The council will continue to report the LGBF annual results to its
Performance and Review Scrutiny Forum. However, the bespoke approach
noted above aims to provide greater opportunities for members to scrutinise the
LGBF within a council specific context and should allow for more meaningful
use when making strategic decisions.
Good practice
The council has worked collaboratively with the Improvement Service to achieve
the most value from the LGBF in a way that helps drive its improvement based on
its strategic priorities. 
69

Page 70

5. Best Value | 48 
Service performance is reported in line with the expectations of
the statutory performance indicators (SPIs) 
185.  The Accounts Commission has a statutory responsibility to define the
performance information that councils must publish. In turn, councils have their
own responsibility, under their Best Value duty, to report performance to the
public. The commission does not prescribe how councils should report this
information but expects them to provide the public with fair, balanced, and
engaging performance information.
186.  The Accounts Commission issued a revised 2018 Statutory Performance
Information Direction in December 2018 which requires a council to report: 
• its performance in improving local public services provided by the council
(on its own and with its partners and communities), and progress against
agreed desired outcomes
• its own assessment and independent audit assessments of how it is
performing against its duty of Best Value, and how it plans to improve
these assessments and how it (with its partners where appropriate) has
engaged with and responded to its diverse communities.
187.  Our work in 2021/22 has confirmed that the council’s performance
reporting arrangements were effective. The council’s website covers all the
requirements set out in the SPI direction issued by the Accounts Commission. 
70

Page 71

Appendix 1: Action plan | 49 
Appendix 1: Action plan 
2021/22 council recommendations
Issue/risk Recommendation  Agreed management
action/timing
1. Accounting for non-
current assets 
We identified a significant
error in the processing of
council dwellings
revaluations.
Risk: If the accounting for
non-current assets is not
improved future accounts
could be materially misstated.
There should be second
officer checks of significant
non-current asset accounting
entries. This will help to verify
the accuracy of the asset
figures in the 2022/23 annual
accounts prior to these being
submitted to audit.
Paragraph 44 
Action
Second officer checks on
non-current asset accounting
will be implemented with
immediate effect.
Responsible officer
Head of Property Services
Agreed date 
30 September 2022
2. Long-term financial
pressures
The council’s 2022/23 budget
is balanced. However, the
council has identified
£100.192 million of required
savings between 2023/24 to
2027/28.
Risk: The longer-term
financial pressures of the
council are not addressed. 
The council should identify
where it can progress
transformational change in
how services are delivered to
address the longer-term
financial pressures it faces.
Paragraph 126 
Action
The council has an ongoing
programme of
Transformational reviews
which consider service
delivery models, with a view
to identifying efficiency
savings. These will continue
to feed into future budget
strategies 
Responsible officer
Executive Director Finance
and Corporate Resources 
Agreed date 
Ongoing 
71

Page 72

Appendix 1: Action plan | 50 
2021/22 charities recommendation
Issue/risk Recommendation  Agreed management
action/timing
1. Dormant trust
The East Kilbride Information
Technology Centre Trust has
been dormant for several
years.
Risk: Funds are lying
dormant and do not provide
public benefit. 
The trustees of the East
Kilbride Information
Technology Centre Trust
should consider the future of
the trust and decide how this
will be used going forward.
This would include
consideration of whether
steps should now be taken, in
coordination with the Office of
the Scottish Charity
Regulator, to wind it up if it is
no longer being used for its
intended purpose. 
Paragraph 32
Action
A decision will be taken by
trustees regarding the future
of the Trust at a meeting on 3
October 2022. 
Responsible officer
Head of Personnel
Agreed date 
3 October 2022
Follow-up of prior year council recommendations
Issue/risk Recommendation  Agreed management
action/timing
PY1. Accounting for non-
current assets 
Our testing of the council’s
non-current assets identified
several issues impacting on
the accuracy of the asset
register covering areas such
as disposals and additions.
Changes have been made to
the 2020/21 audited accounts
to correct these errors.
Risk: If the asset register is
not complete and accurate
future accounts could be
materially misstated.
Clear year-end
communication between
Property Services and
Corporate Finance is
required to ensure
accounting records are
complete and accurate for
the annual accounts. 
Closed - this has been
superseded by
recommendation 1 above 
In 2021/22 there has been a
reduction in the number of
non-current asset accounting
issues. However, as reported
in exhibit 3, we have
identified a significant error in
the processing of council
dwellings revaluations.
See appendix 1,
recommendation 1
PY2. Assets Held for Sale
Our testing of assets held for
sale identified one asset held
for sale since 2018/19 which
has not been revalued since
2016/17.
Management should
implement a robust review
process to ensure that any
assets held for sale for
longer than one year are
identified and considered for
revaluation to ensure that
Closed
Through our testing in year,
we are satisfied that Assets
Held for Sale are held at the
appropriate value and were
72

Page 73

Appendix 1: Action plan | 51 
Issue/risk Recommendation  Agreed management
action/timing
We would expect that assets
held for sale for longer than
one year are considered for
revaluation.
Risk: The values for assets
held for sale within the asset
register are misstated.
assets are held at the
appropriate value. 
considered as part of the
year-end process. 
PY3. Revised financial plans
to reflect Covid-19 
The council’s medium and
longer-term financial strategy
was developed prior to the
Covid-19 pandemic. 
Risk: The assumptions made
in the council’s financial
strategy are out of date as they
do not consider the financial
impact of Covid-19. 
The council should review
its long-term financial
strategy to reflect the impact
of Covid-19 on the council’s
finances going forward,
including scenario planning
of key financial
assumptions. 
Ongoing 
The ongoing financial
sustainability pressures faced
by the council have been
discussed in section 3 of this
report. 
As with most public sector
organisations, the council will
be dealing with the impacts of
the pandemic for years to
come. There is a need for
transformational change to
help address longer-term
financial pressures. 
See appendix 1,
recommendation 2
PY4. Arrears of rent and
other housing charges
These charges amount to
some £20.137 million in total.
There are a number of
individual arrears balances for
substantial amounts.
Members receive little
information on the arrears
position.
Risk: Arrears are not being
pursued in accordance with
agreed policy and procedures.
The collection of high and
escalating arrears balances
become increasingly unlikely.
Members are unaware of the
nature and scale of underlying
balances.
Management should review
the policy and procedures
for pursuing arrears to
ensure that appropriate and
timeous interventions are
being made. 
Management should
investigate large arrears
balances and ensure that
everything is being done to
collect amounts due.
Members should be
provided with sufficient
information on arrears at
each committee cycle to
allow them to exercise
appropriate oversight. 
Closed
Steps have been taken to
reduce the number of
significant arrears cases over
the past two years. The
council responds positively to
audit recommendations and
seeks to action these where
possible. 
The council will continue to
monitor its arrears position,
but it is appropriate to close
this action point. 
73

Page 74

Appendix 2: Wider dimension risk | 52 
Appendix 2: Wider dimension
risk 
The table below sets out the audit dimension risk that we identified in our
2021/22 Annual Audit Plan together with a summary of the audit procedures we
performed during the year to obtain assurances over this risk and the
conclusions from the work completed.
Audit dimension risk
Description of risk Assurance procedure Results and conclusions
1. Financial sustainability 
As is the position across
Scotland, the council
continues to operate in an
increasingly complex and
challenging environment,
where core national funding
is reducing relative to rising
demand for services. A wide
range of financial
uncertainties has been further
complicated due to the
ongoing pandemic and the
council faces significant
challenges to remain
financially resilient and
deliver services sustainably.
The council has identified a
savings requirement of
£86.591 million between
2023/24 - 2026/27.
Risk: The financial pressures
impact on the sustainability
and quality of council
services in the future.
Monitor how the council’s
budget is affected in 2022/23
and the impact on
medium/longer term financial
planning.
Report the 2021/22 outturn in
our Annual Audit Report.
Monitor the council’s
performance reports to
establish the impact of any
financial, and ongoing Covid-
19 pressures on services.
Results: The council has
identified the necessary
savings to address its
2022/23 budget gap.
However, this is predicated
on the use of non-recurring
savings. 
The pandemic significantly
impacted on many aspects of
council’s finances in 2021/22,
with £23.845 million of
unspent Covid-19 funding
contributing to the overall
budget underspend of
£66.074 million.
The council’s service
performance has remained
stable over the past year. 
Conclusion: As with most
public sector organisations,
the council will be dealing
with the impacts of the
pandemic for years to come.
There is a need for
transformational change to
help address longer-term
financial pressures. 
See appendix 1,
recommendation 2
74

Page 75

Appendix 3: National performance reports | 53 
Appendix 3: National
performance reports 
May
Local government in Scotland Overview 2021
June
Covid 19: Personal protective equipment
July
Community justice: Sustainable alternatives to custody
September
Covid 19: Vaccination programme
January
Planning for skills
Social care briefing
February
NHS in Scotland 2021
March
Local government in Scotland: Financial Overview 20/21
Drug and alcohol: An update
Scotland’s economy: Supporting businesses through the Covid 19 pandemic  
75

Page 76

Appendix 3: National performance reports | 54  
South Lanarkshire Council
2021/22 Annual Audit Report 
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
AS.4.0 
76

Page 77

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 25 October 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Audited Annual Accounts 2021/2022 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the requirement to approve the Annual Accounts 2021/2022
for signature, both Council and related Charitable Trusts 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that it be noted that the South Lanarkshire Council Accounts 2021/2022 and
the Charitable Accounts have received a clean audit certificate;
(2) that the audited South Lanarkshire Council Accounts 2021/2022 and the
Charitable Trusts’ Accounts be approved for signature; 
(3) that it be noted that the External Auditor’s Report will be referred to South
Lanarkshire Council for information; and
(4) that it be noted that the Audited Accounts 2021/2022 will be available on the
Council’s website (section 3.5). 
[1recs]
3. Background
3.1. Following the publication of The Local Authority Accounts (Scotland) Regulations
2014, the members of the Committee have to meet to consider whether to approve
the Audited Annual Accounts for signature, no later than the 30 September 2022. 
Due to COVID-19 pandemic, the Scottish Government introduced legislation which
allowed this deadline to be extended to 30 November. 
3.2. The members are also required to have regard to any report made or advice
provided on the Annual Accounts by the External Auditor. 
3.3. The External Auditor’s Report was included as an earlier report to this meeting and
will be referred to the meeting of South Lanarkshire Council (7 December 2022) for
information. 
3.4. Copies of the (unsigned) Audited Accounts 2021/2022, for both the Council and
Related Charities, are being emailed to members of this Committee under separate
cover.  Copies of the Council’s Audited Accounts, the Charitable Trusts’ Audited
Accounts and the External Auditor’s Report, will be issued to all Elected Members for
their information. 
3
77

Page 78

3.5. Once signed, the Audited Accounts will be available to the general public on the
Council’s website and we can arrange to send a copy out to anyone who requests
them. 
4. Audited Accounts – South Lanarkshire Council 
4.1. As noted in section 3.1, members of the Committee are required to approve the
Audited Accounts for signature.  A copy of the Audited Accounts for 2021/2022 are
being emailed to Members of this Committee under separate cover. 
4.2. As detailed in a previous report, the Council’s External Auditors, Audit Scotland,
have completed an audit which extends across the 2021/2022 Accounts and related
matters. 
4.3. The report notes that the External Auditor has provided a clear Audit Certificate with
no qualifications on the Council’s Accounts. 
4.4. The External Auditor’s Report also includes an agreed action plan at Appendix 1. 
Officers of the Council will work to ensure that these actions are implemented during
2022/2023. 
5. Audited Accounts – Charitable Trusts
5.1. Members of the Committee are required to approve the Charitable Trusts’ Audited
Accounts for signature.  A copy of the Audited Accounts for 2021/2022 have been
emailed to Members of this Committee under separate cover. 
5.2. The External Auditor also reports on the 3 Charitable Trusts managed by the
Council: South Lanarkshire Council Educational Trust, South Lanarkshire Council
Charitable Trust and the East Kilbride Information Technology Trust.   
5.3. The External Auditor’s report shows a clear audit certificate for each Trust.   
6. Employee Implications
6.1. There are no direct employee implications from this report. 
7. Financial Implications
7.1. There are no direct financial implications arising from this report.  The Annual
Accounts received a clear audit certificate.  The main changes to the Council’s
Accounts 2021/2022 are detailed in the External Auditor’s report.  All changes
identified in the External Auditor’s report have been made and the impact on the
Council’s outturn reflected in the Audited Accounts. The changes were in respect of
the revaluation of Council House dwellings. There is no impact in relation to the
Council’s uncommitted reserves. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council and Charitable Annual Accounts is a
qualified audit report. The risk has been assessed as low due to the detailed
preparation in relation to the year end process, technical training undertaken by key
finance staff and the roll out of this to Resource finance staff as appropriate. Finance
and Resources work together to achieve key deadlines and actions set from
timetables. 
78

Page 79

10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
10.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
10 October 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 South Lanarkshire Council Annual Accounts 2021/2022 and External Auditor’s Report.
 Charitable Trusts’ Annual Accounts 2021/2022 and External Auditor’s Report.
 Financial Ledger 2021/2022 and associated working papers. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jackie Taylor, Head of Finance
Ext:  5637  (Tel:  01698 455637)
E-mail:  jackie.taylor@southlanarkshire.gov.uk
79

Page 80

80

Page 81

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 25 October 2022
Report by: Executive Director (Finance and Corporate Resources) 
Subject: Year End Risk Management Report (2021/2022) and
Review of Council's Top Risks (2022/2023)   
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Risk and Audit Scrutiny Committee (RASC) with an update on progress
with risk management activity undertaken during 2021/2022
 provide an update on the Council’s top risk register following the review and
consultation process
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that Resource compliance with the requirements of the Risk Management
Strategy be noted;
(2) that the progress being made in delivering actions to mitigate top Council risks
be noted; and
(3) that the updated Council’s top risks be noted.
[1recs
3. Background
3.1. Annual reviews of the Council’s top risks are undertaken, with the findings of the last
review reported to the RASC on 15 September 2021. This year’s full review
commenced in April 2022.  The consultation involved views being sought from Heads
of Service, Elected Members and Trade Unions on new areas of risk. 
3.2. An informal benchmarking exercise was undertaken to review the Council’s top risks
against 2 authority’s risk registers (North Lanarkshire Council and Renfrewshire
Council). This review established that the current South Lanarkshire Council top risk
register is in the main reflective of the risks faced by the 2 authorities. 
3.3. A session was held with members of the RASC on 25 August 2022 to provide
background information on the Council’s risk management processes, the top risk
review, and to allow members an opportunity to submit any areas for consideration as
part of the top risk review. 
3.4. The results of the work undertaken was considered and used to inform proposals for
a refined set of top risks.  The feedback was used to review risk descriptions, as
required. 
3.5. The content of this report provides the Committee with recommendations in respect of
the review these risks. 
4
81

Page 82

4. Resource compliance with the Risk Management Strategy 
4.1. Risk Sponsors are required on an annual basis to assess Resource compliance with
the Risk Management Strategy and provide supporting evidence.  The information for
2021/2022 is summarised in the end of year compliance statement which is attached
at Appendix 1. 
4.2. Appendix 1 shows that Resources continue to demonstrate full compliance with the
Strategy, having scored 45 out of 45. 
4.3. It is important that the current level of compliance is maintained to demonstrate
effective risk management which contributes to robust service planning and improved
decision making. 
5. Progress made in delivering actions to control the Council’s top risks
5.1. As at 31 March 2022, the percentage of actions completed was 70 per cent against
an overall target of 90 per cent. Some actions have been delayed and carried forward. 
5.2. Table 1 below shows the overall status as at 31 March 2022 for all actions relating to
the Council’s top risk register. 
Table 1 – Completion of top risk control actions
Action status Number of
actions
Percentage
of actions
Complete 14 70%
Carried forward to 2022/2023  6 30%
Total 20 100% 
5.3. Actions identified during this year’s review have been included within the 2022/2023
top risk control plan.  This contains a total of 16 actions. 
6. Results of the review of the Council’s top risks
6.1. To assist the review process, the following broad criteria were recommended as a
guide to concluding what constitutes a top risk:- 
 it threatens delivery of corporate objectives
 it impacts on other services or partnerships
 there are financial impacts or it impacts on other key priority strategies
 there are impacts of a social or demographic context 
6.2. The Council’s Risk Management Strategy uses a 5x5 risk scoring matrix to determine
inherent and residual risk scores. The risk matrix is attached at Appendix 2. 
6.3. Risks from last year’s review, as detailed in the report to RASC on 15 September 2021
were mostly deemed to be still valid. The main changes to the top risks are
summarised below:- 
 5 new risks have been added:-
 The Council is unable to support households most impacted by the cost-of-
living crisis, resulting in increasing levels of poverty, debt and damage to
health
- The focus of this new risk is on the support that the Council can provide
to households, but it is important to note, with the gravity of the issue,
the Council’s support role is only a small part of the mitigation, with the
Government and Energy Companies playing a lead role
82

Page 83

 Disruption to Council services as a result of industrial action
 The Council fails to deliver the objectives of the Community Wealth Building
Strategy
 Inability of the Council to effectively accommodate and support households
who arrive in South Lanarkshire as part of refugee resettlement and the
asylum seeker dispersal programmes
- Partners will also play a role in mitigating this risk
 Failure to achieve the outcomes of the Council Plan
 the ‘EU Exit’ risk has been removed as this is no longer considered a corporate
issue for the Council. Where residual risk issues remain to be addressed, these
will stay on Resource risk registers and be managed accordingly
 the risk description on ‘Funding’ has been updated, to reflect the level of
Government grant received, inflationary increases, rising energy costs, reduced
income (cost-of-living crisis) and greater pressure on Council budgets
 the ‘pandemic’ risk description has been refocused to consider potential future
events and residual effects of the current pandemic being managed at Resource
level.  The residual risk score has been reduced from 16 to 12
 the ‘Council is materially affected by the recommendations arising from the
independent review of Adult Social Care in Scotland’ risk description has been
updated to reflect the National Care Services (Scotland) Bill that was presented
to Parliament on 20 June 2022, with the Scottish Government now committed to
establishing a National Care Service by the end of the current parliamentary term
in 2026
 the ‘sustainable development and climate change’ risk has been updated to
reflect the recently approved strategy and pending development of an action plan
to mitigate this risk
 the ‘historic abuse’ risk wording has been updated to reflect the opening of the
National Redress Scheme and the continuation of the Scottish Child Abuse
Inquiry
 the ‘procurement’ risk has been updated to reflect supply chain issues.  The risk
score has increased accordingly from 9 to 12
 the ‘fraud, theft, organised crime and cyber attacks’ risk has been updated to
reflect the global increase in cyber attacks
 the ‘lack of capacity and skills’ risk has been updated noting difficulties with the
recruitment and retention of staff
 the ‘extreme weather’ risk has been updated to cover droughts/water supply
issues and wildfires
 IT developments and functionality - no change to the overarching top risk,
however, there are three significant IT projects being progressed at present for
the Integrated Housing Management System, the SWIS+ replacement and
Fusion. Appropriate arrangements are in place to record and manage risks for
each of these projects
 risk descriptions, controls and actions have been updated as required on
individual risks, following discussion with risk owners. 
6.4. The Council’s top risk register is monitored on an ongoing basis and updates are
reported annually to this Committee. Risk scores and rankings may be amended if
new information comes to light that allows the position to be reassessed. 
6.5. As a result of the above changes and taking account of the revision of risk scores, the
top risk register for 2022/2023 is attached at Appendix 3.   
6.6. Within Appendix 3, categories one and two relate to very high and high level risks.  To
maintain focus on the higher scored risks, those risks with a medium or low residual
83

Page 84

risk score have been excluded.  These risks will continue to be monitored at a
Resource level to ensure that they are adequately managed. 
7. Horizon scanning
7.1. Through wider analysis, several areas that could pose potential threats and risks or
are emerging issues and opportunities that could affect the Council were identified.
Areas identified are listed below:- 
 Ash Dieback Disease - Ash Dieback Disease is the most significant tree disease
to affect broadleaved trees in the UK since Dutch elm disease gained prominence
in the 1960s. Data from Europe suggests it will lead to the decline and death of
50% to 75% of Ash trees in Scotland over the next 2 decades. An Ash Dieback
Action Plan is being developed to combat this risk in South Lanarkshire. 
 COVID-19 National Inquiry - The terms of reference and a chair for a public
inquiry into the handling of Coronavirus (COVID-19) in Scotland were announced
by Scottish Ministers on 14 December 2021.  This is a statutory inquiry under the
Inquiries Act 2005. 
It will provide scrutiny of and learn lessons from the handling of the COVID-19
pandemic in Scotland, to ensure that Scotland is as prepared as possible for future
pandemics. 
It is envisaged that as the Inquiry progresses, the Council will receive a number of
Section 21 notices, which will be time intensive in responding to. 
7.2. These areas will continue to be monitored to ensure that the Council is adequately
prepared to respond where required.   
8. Three lines model
8.1. A model has been developed by the Institute of Internal Auditors which aims to provide
assurance of the adequacy of control measures that are in place for strategic risks. 
8.2. The intention of the model is to ensure that top risks are mitigated through ‘three lines
of defence’, which are:- 
Line 1 - Control by operational management
Line 2 - Control and compliance by functions that have an oversight role (for example
Risk Management)
Line 3 - Independent assurance 
8.3. Some initial work was completed by Internal Audit last year to group existing controls
per the 3 lines model for individual top risks. Further work will be undertaken this year
to revisit this for each of the updated risk control cards. 
8.4. A Strategic Risk Assurance Map will subsequently be created by Internal Audit. It is
envisaged that this will assist in identifying areas of potential weakness and also aid
identification/articulation of controls. 
9. Scope and appetite for risk
9.1. The Council aims to be risk embracing, that is it will accept a tolerable level of risk in
seeking service efficiencies and in agreeing control measures. 
9.2. The level of risk facing the Council is measured both before (inherent risk) and after
(residual risk) consideration of controls.  The Council should never carry a very high
84

Page 85

residual risk exposure as this would indicate instability, but a low residual risk exposure
should also be avoided as this indicates lack of innovation. 
9.3. The Council’s universal risk tolerance levels were updated as part of the review of the
risk management strategy last year, with the ideal risk profile defined as:- 
 No more than 10 per cent of residual risks at a very high level
 No more than 15 per cent of risks at a high level
 Around 50 to 60 per cent of residual risks at a medium level
 No more than 30 per cent of residual risks at a low level 
9.4. Table 2 below shows the top risks heat map, that is, it details the total number of risks
for each individual risk score.  Table 3 notes the overall risk profile for the top risks. 
Table 2 – Top risks heat map
Likelihood
5
Almost certain   1 2 
4
Likely   3 3 
3
Possible   3 6 
2
Unlikely    3 
1
Rare     
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
Table 3 –Top risks risk profile
Risk
category
Risk
rating
Number
of risks
Percentage
of risks
1 Very high 6 28.6%
2 High 15 71.4%
3 Medium 0 -
4 Low 0 - 
9.5. Despite the fact that the profile noted in Table 3 is out with the ideal universal risk
exposure defined by the Risk Management Strategy, this risk exposure is reasonable
as these are the highest level risks currently being faced by the Council. 
9.6. The main changes to the risk profile from last year are:- 
 3 new very high risks have been added to the top risk register, ‘the Council is
unable to support households most impacted by the cost of living crisis resulting
in increasing levels of poverty, debt, and damage to health’; ‘the Council fails to
deliver the outcomes of the Community Wealth Building Strategy’; and ‘disruption
to Council services as a result of industrial action’
 2 new high risks have been added to the top risk register ‘failure to achieve the
outcomes of the Council Plan’; and ‘Inability of the Council to effectively
accommodate and support households who arrive in South Lanarkshire as part
of refugee resettlement and the asylum seeker dispersal programmes’
 the high scored risk ‘EU Exit’ has been removed from the top risk register
 the risk score for the Pandemic risk was changed from being very high to high 
85

Page 86

9.7. The number of very high risks has increased from 4 to 6 from last year, with the vast
majority of risks on the top risk register remaining in the high bracket. There are
currently 15 risks scored at this level, two more than last year.   
10. Employee Implications
10.1. There are no direct employee implications relative to this report.  There are proposed
risks which are classified under the heading of employee.  Where this is the case the
appropriate controls and actions have been included in the risk control cards and
progress will be monitored. 
11. Financial Implications
11.1. There are no direct financial implications associated with the Council’s top risks.  There
are a number of proposed risks which are classified under the heading of financial. 
Where this is the case, the appropriate controls and actions have been included in the
risk control cards and progress will be monitored. 
12. Climate Change, Sustainability and Environmental Implications
12.1. There are no direct implications associated with the Council’s top risks.  There are a
number of proposed risks which are classified under the heading of Environmental. 
Where this is the case, the appropriate controls and actions have been included in the
risk control cards and progress will be monitored. 
12.2. Sustainable development issues are included within the Council’s top risk register as
a standalone top risk and also through risks being linked directly to the Council plan
outcomes ‘Caring, connected, sustainable communities’ and ‘Good quality, suitable
and sustainable places to live.’ 
13. Other Implications
13.1. Failure to demonstrate that risk is actively considered and managed can not only lead
to avoidable financial loss but could also adversely affect delivery of services and
could affect the Council’s reputation.  The work carried out to identify and review the
Council’s top risks and to determine the risks controls and actions necessary enables
the Council to manage the impact.   
14. Equality Impact Assessment and Consultation Arrangements
14.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
14.2. Consultation has taken place with Heads of Service, Risk Lead Officers, Elected
Members, Trade Unions and Resource Risk Sponsors. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
5 October 2022 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent  
86

Page 87

Previous References
 Risk and Audit Scrutiny Committee – Review of Council’s Top Risks/Year End Risk
Management Report – 15 September 2021 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions)
Ext:  4951 (Tel: 01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk
87

Page 88

88

Page 89

Appendix 1 - 2021/2022 compliance with risk management strategic requirements 
Key
Score 3= Up to date and in line with requirement 
Score 2= Work in progress 
Score 1= Needs addressed 
Requirement from Risk Management Strategy
Community
and
Enterprise
Resources
Education
Resources
Finance and
Corporate
Resources
Housing and
Technical
Resources
Social W
ork
Resources
Risk registers are updated on an annual basis, in line with the
Council’s Risk Management Strategy 3 3 3 3 3
Where appropriate, Council top risks are adequately reflected in the
Resource risk register 3 3 3 3 3
Delivery of Resource risk control actions and control actions for top
risks lead by the Resource are progressed. 3 3 3 3 3
The risk register and risk control plan are approved annually by the
Resource Management Team 3 3 3 3 3
The risk register is presented for noting; and assurance of delivery
of actions is given to the Resource Committee on an annual basis. 3 3 3 3 3
Information held on Figtree reflects the latest Resource Risk
Register and Risk Control Plan 3 3 3 3 3
The Council’s agreed risk profile and risk tolerance level is adopted. 3 3 3 3 3
Risk evaluations are undertaken prior to the commencement of
major projects, partnerships and organisational changes 3 3 3 3 3
Formal risk sharing agreements for major partnerships and
contracts are in place 3 3 3 3 3
Major decisions are transparent and clearly show the following key
elements:
• Full cost over life of proposal;
• Funding source;
• Savings or efficiencies;
• Other benefits;
• Associated risks and how they will be managed.
3 3 3 3 3
Elected members are kept informed of risks by using the “Other
Implications” section of the Committee report template.  This section
should include:
• The risks involved with the report’s recommendations;
• The potential positive and negative consequences;
• How these risks are currently being managed (existing controls)
or how they will be managed going forward (additional actions);
• Link to risks on the council’s top risk register.
3 3 3 3 3
Assurance is gained from contractors and sub-contractors, in line
with procurement processes, of their adoption of recommended risk
management practices, particularly that adequate insurance cover,
safe health and safety practices, and equalities, sustainable
development, business continuity and scrutiny procedures are in
place.
3 3 3 3 3
Regular Resource Risk Management Group meetings (or alternative
where risk management is a standing agenda item). 3 3 3 3 3
Liaison with Service Planners to ensure that risks associated with
council and Resource plans are identified and assessed; and that
appropriate plans are put in place to manage these risks. 
3 3 3 3 3
Management of insurance hotspots and required mitigating actions 3 3 3 3 3
Total 45 45 45 45 45
Percentage compliance 100% 100% 100% 100% 100% 
4
89

Page 90

Appendix 2 – Risk scoring matrix and likelihood and impact definitions 
Likelihood 
Score 1 2 3 4 5
Description Rare   Unlikely  Possible  Likely Almost
certain 
Likelihood of
occurrence
1 in 10 years 1 in 3 years 1 in 2 years Annually Monthly
Probability of
occurrence
The event may
occur in certain
circumstances
The event
could occur
The event may
occur
The event will
probably occur
The event is
expected to
occur or
occurs
regularly 
Impact 
Reputation Financial Service delivery/
Time to recover
Compliance Safety
1
Negligible
Public concern
restricted to
local
complaints
<£50,000 per
annum
No impact to
service quality;
limited disruption
to operations.
No external
interest
Minor injury
– no lost
time
2
Minor
Minor adverse
local/public/me
dia attention
and complaints
£50,000-
£250,000 per
annum
Minor impact to
service quality;
minor service
standards are not
met; short term 
Very minor
attention
from
legislative
/regulatory
body
Minor injury
– resulting
in lost time
3
Moderate
Adverse
national media
Public attention
£250,000 to
£500,000 per
annum
Significant fall in
service quality;
major partnership
relationships
strained; serious
disruption in
service standards
Short-term
attention
from
legislative/
regulatory
body 
Major injury
or ill health
resulting in
lost time
4
Major
Serious
negative
national or
regional
criticism
£500,000 to
£1million per
annum
Major impact to
service delivery;
multiple service
standards are not
met; long term
disruption to
operations;
multiple
partnerships
affected
Medium-term
attention
from
legislative/
regulatory
body 
Fatality;
Or injuries
to several
people
5
Catastrophic
Prolonged
international,
regional and
national
condemnation
>£1million per
annum
Catastrophic fail
in service quality
and key service
standards are not
met; long term
catastrophic
interruption to
operations;
several major
partnerships are
affected
National
impact with
rapid
intervention
of legislative/
regulatory
body 
Multiple
fatalities; Or
injuries to
large
number of
people 
The assessments for impact and likelihood combine to provide an overall inherent risk score on the
scale of between 1 and 25, using the Council’s recognised risk matrix. 
90

Page 91

Risk matrix
Likelihood
5
Almost
certain
5 10 15 20 25
4
Likely 4 8 12 16 20
3
Possible 3 6 9 12 15
2
Unlikely 2 4 6 8 10
1
Rare 1 2 3 4 5  
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
The risk score is calculated as follows:
Likelihood score x Impact score = Risk score 
91

Page 92

Appendix 3: Council top risk register 2022 
Risk
Category
Key risk Inherent
Risk
Score
Residual
Risk
Score
Controls
(Good,
adequate,
poor)
1
Very 
High
(15-25) 
Reduction in external funding and fees/income
received by the Council, as well as the increased
demand for services including the residual impact
of the pandemic, and the increased cost of
services due to rising inflation and the cost-of-
living crisis, results in increasing budget gaps. 
The Council is seeing considerable increases in
prices in terms of energy, fuel and food costs
reflecting the global economic environment. 
These will have an impact on the current and
future years’ Budget Strategy.  This may also
affect the level of service that the Council can
provide.
25 20 Adequate
The Council is unable to support households
most impacted by the cost of living crisis resulting
in increasing levels of poverty, debt, and damage
to health
25 20 Adequate
The Council fails to deliver the objectives of the
Community Wealth Building Strategy
20 16 Good
The Council is materially affected by the
implications arising from the National Care
Service Bill
16 16 Adequate
Disruption to Council services as a result of
industrial action
20 16 Adequate
Failure to meet sustainable development and
climate change objectives.
20 15 Good
2
High
(8-12)
Inability of the Council to effectively accommodate
and support households who arrive in South
Lanarkshire as part of refugee resettlement and
the asylum seeker dispersal programmes
16 12 Adequate
The Council does not have the appropriate
emergency / business continuity plans;
contingency arrangements or partnerships in
place to respond to/or recover from a
pandemic/endemic event.
25 12 Good
Procurement activity is affected by supply chain
issues; a lack of resources; non-compliance or
legal challenge
25 12 Good
The Council fails meet statutory and legislative
duties in respect of public protection 
16 12 Good
Fraud, theft, organised crime and cyber attacks 20 12 Adequate
Failure to fulfil emergency response commitments
befitting the council’s status as a Category One
(emergency) responder
25 12 Adequate
Historic childhood abuse  16 12 Good 92

Page 93

Information governance not subject to adequate
control
20 12 Good
The Council does not fully deliver the strategic
outcomes required of the IJB as outlined in their
Strategic Commissioning Plan
16 12 Good
IT development and functionality does not keep
pace with changing service requirements
20 9 Adequate
Lack of capacity and skills to meet increased
service demands
20 9 Good
Increasing levels of adverse weather 16 9 Good
Failure to ensure the health, safety and wellbeing
of employees and the protection of service users
and members of the public in the delivery of
Council services
20 8 Good
Failure to achieve the outcomes of the
Community Plan
20 8 Adequate
Failure to achieve the outcomes of the Council
Plan
16 8 Adequate 
Removed 
from
top risks
The Council is significantly affected by the impact of the UK leaving the European
Union
93

Page 94

94