Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 11 November 2024 
Dear Councillor 
Risk and Audit Scrutiny Committee 
The Members listed below are requested to attend a meeting of the Committee to be held as
follows:- 
Date:  Tuesday, 19 November 2024
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Elaine McDougall (Chair), Mary Donnelly (Depute Chair), Mathew Buchanan, Alistair Fulton,
Ross Gowland, Celine Handibode, Cal Johnston-Dempsey, Susan Kerr, Richard Lockhart 
Substitutes
Colin Dewar, Monique Equi, Gavin Keatt, Helen Toner
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Risk and Audit Scrutiny Committee held on
24 September 2024 submitted for approval as a correct record. (Copy
attached) 
3 - 14 
Item(s) for Noting 
3 Internal Audit Activity as at 31 October 2024
Report dated 1 November 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
15 - 20 
4 Audit Scotland – Transformation In Councils
Report dated 28 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
21 - 26 
5 Forward Programme for Future Meetings
Report dated 1 November 2024 by the Executive Director (Finance and
Corporate Resources). (Copy attached) 
27 - 30 
Urgent Business 
6 Urgent Business
Any other items of business which the Chair decides are urgent. 
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
2

Page 3

RISK AND AUDIT SCRUTINY COMMITTEE 
Minutes of meeting held via MS Teams and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 24 September 2024 
Chair:
Councillor Elaine McDougall 
Councillors Present:
Councillor Colin Dewar (substitute for Councillor Alistair Fulton), Councillor Mary Donnelly (Depute),
Councillor Ross Gowland, Councillor Cal Johnston-Dempsey, Councillor Susan Kerr, Councillor
Richard Lockhart 
Councillors' Apologies:
Councillor Mathew Buchanan, Councillor Alistair Fulton, Councillor Celine Handibode 
Councillor Also Present:
Councillor Gerry Convery (for items 3 and 4) 
Attending:
Chief Executive’s Service
P Manning, Chief Executive (for items 3 and 4)
Finance and Corporate Resources
J Taylor, Executive Director; Y Douglas, Audit and Compliance Manager; S Dunsmore, Insurance
and Risk Management Adviser; E-A McGonigle, Administration Adviser; A Norris, Administration
Assistant; L O’Hagan, Head of Finance (Strategy); I Strachan, Head of Administration and Legal
Services 
Also Attending:
Audit Scotland
J Boyd, A Barclay and M Ferris, External Auditors 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Risk and Audit Scrutiny Committee held on 25 June 2024
were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3a External Auditors’ Annual Report to South Lanarkshire Council 2023/2024 
The following documents were submitted by Audit Scotland, the Council’s external auditors:- 
 letter and appendices relating to the 2023/2024 Annual Audit report on South Lanarkshire
Council 
 2023/2024 South Lanarkshire Council proposed Annual Audit report to members of the
Council and the Controller of Audit 
2
3

Page 4

The Audit Director, Audit Scotland, spoke on the Annual Audit report and highlighted the
following:- 
 the audit of the 2023/2024 Annual Accounts
 financial management
 financial sustainability
 best value
 vision, leadership and governance
 use of resources to improve outcomes
 key messages
 significant findings and key audit matters:-
 Council house evaluations
 significant risks of material misstatement in the annual accounts identified during planning
of the audit:-
 risk of material misstatement due to fraud caused by management override of
controls
 estimation in the valuation of land and buildings
 2023/2024 action plan on recommendations for improvement
 summary of corrected misstatements 
The external auditors’ opinion on the Council’s Annual Accounts 2023/2024 and those of the 3
charities administered by the Council was unmodified, that is, the financial statements and
related reports were free from material misstatement.   
Due to the interaction of section 106 of the Local Government in Scotland Act 1973 with the
charities legislation, a separate independent auditor’s report was required for the statement of
accounts of each registered charity where members of the Council were sole trustees and this
was irrespective of the size of the charity.  The Council had made good progress in reducing or
removing the number of charitable trusts where it was the sole trustee. 
Officers responded to members’ questions in relation to:- 
 the performance against indicators in the Local Government Benchmarking Framework
(LGBF)
 the issue around the percentage of reports being submitted to the Children’s Reporter
within the agreed timescale not meeting the target
 ongoing training support to elected members and when the results of the training needs
analysis exercise, which had been carried out earlier in the year, would be implemented 
The Audit Director, Audit Scotland extended thanks to the Executive Director (Finance and
Corporate Resources), the Head of Finance (Strategy) and the wider team for their help and
support during the course of the audit.  The Chair, on behalf of the Committee, echoed those
remarks. 
The Committee decided: that the report be noted. 
3b External Auditors’ Annual Report to South Lanarkshire Council 2023/2024: South
Lanarkshire Council Charitable Trusts 
Summary letters, proposed independent auditor’s reports and letters of representation (ISA 580)
were submitted by Audit Scotland, the Council’s external auditors for South Lanarkshire Council
Charitable Trusts.
4

Page 5

The Senior Auditor, Audit Scotland advised that there were no unadjusted misstatements to be
corrected for the Charitable Trusts administered by the Council. 
The Committee decided: that the report be noted. 
4 Audited Annual Accounts 2023/2024 
A report dated 10 September 2024 by the Executive Director (Finance and Corporate
Resources) was submitted on the:- 
 Council’s Certified Annual Accounts and Charitable Trusts’ Accounts for 2023/2024, which
had received a clean audit certificate from the Council’s external auditors, Audit Scotland
 requirement to approve the Annual Accounts 2023/2024 for signature in terms of both the
Council’s accounts and related charitable trusts 
The accounts covered the Council as well as 3 Charitable Trusts managed by the Council,
namely South Lanarkshire Council Educational Trust, South Lanarkshire Council Charitable
Trust and the East Kilbride Information Technology Trust.  A clean audit certificate had been
received for each with no qualifications on the Council’s accounts.  An agreed action plan had
been included in the external auditor’s report and officers would work to ensure those were
implemented in 2023/2024. 
The Annual Accounts would be advertised as being available for public inspection on the
Council’s website and on request from Finance Services. 
The Committee decided: 
(1) that it be noted that the South Lanarkshire Council Annual Accounts 2023/2024 and the
Charitable Trusts’ Accounts had each received a clean audit certificate from the Council’s
external auditors, Audit Scotland; 
(2) that the audited South Lanarkshire Council Accounts 2023/2024 and the Charitable Trusts’
Accounts be approved for signature; 
(3) that it be noted that the external auditor’s report would be referred to a future meeting of
South Lanarkshire Council for information; and 
(4) that it be noted that, as detailed at section 3.6 of the report, the Audited Accounts
2023/2024 would be available on the Council’s website. 
[Reference:  Minutes of 25 June 2024 (Paragraph 5)] 
5 2022 National Fraud Initiative Exercise 
A report dated 6 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted:- 
 advising of the outcome of investigations undertaken as part of the 2022 National Fraud
Initiative (NFI) exercise
 providing a summary of Audit Scotland’s report ‘The National Fraud Initiative in Scotland
2022’ which was published in August 2024
5

Page 6

The NFI matched similar data across public sector systems and identified possible
inconsistencies. Those inconsistencies, known as matches, required to be investigated by
participating public bodies with a view to detecting fraud.  The Council had taken part in NFI
exercises since 2004/2005.  Those exercises were undertaken every 2 years and included data
from benefits, payroll, creditors and blue badge holders along with a match of the electoral
register to council tax records to detect where single person discount (SPD) had been claimed
despite there being more than one person over 18 in the household.  The 2022 NFI had been a
full exercise and involved Council wide comparisons including:- 
 housing benefits  blue badge holders
 Council Tax Reduction Scheme
 payroll
 housing tenants
 waiting lists
 procurement
 creditors
 Council tax SPD 
Records had also been matched to the Department for Work and Pensions’ (DWP) deceased
persons’ record. 
The 2022 NFI results were detailed at section 4 of the report and highlighted that for the
Council:- 
 at June 2023, a total of 26,026 matches had been identified.  Following further data
refreshes and a subsequent release of additional matches, the final number of matches
was 28,090.  Of those, it was intended to investigate a target of 10,676 which had been
agreed by External Audit.  A further 74 matches had been investigated outwith the target
number and included responding to enquiries from other authorities/organisations
 separate to the NFI exercise, Benefits and Revenue used an external contractor, Datatank,
to undertake rolling reviews around SPD eligibility.  Due to a gap in the contract, which had
now been addressed, there were a higher number of SPD NFI outcomes than the previous
exercise
 the Housing Benefit Fraud team had transferred to the DWP Fraud and Error Service
(FES), although initial NFI investigations were undertaken by the Council.  If this indicated
a potential benefit fraud, the case was passed to FES.  Matches were closed on the NFI
website as “passed to DWP”
 317 recoverable fraud and errors had been detected through the current NFI exercise, with
an amount to be recovered of £107,116 
The following information was provided in appendices 1 to 5 to the report respectively:- 
 a list of the matched areas in the 2022 exercise
 an update on matches previously reported
 a breakdown of target investigations and actual outcomes in relation to the 317
recoverable fraud and errors
 a comparison of outcomes to the 2020 NFI exercise
 a timetable for the 2024 NFI exercise 
At the conclusion of each NFI exercise, Audit Scotland published an overview report that set out
NFI outcomes across Scotland which drew conclusions from the results and made
recommendations for consideration ahead of the next NFI exercise.  Detailed information was
provided in section 5 of the report.  Audit Scotland had reported that although governance and
follow-up arrangements remained sound for most of the bodies in Scotland that participated in
the 2022 exercise, several had struggled with the delivery and there remained scope for
improvement.  The Auditor had ranked the delivery as ‘satisfactory’, ‘mostly adequate’ and
‘unsatisfactory’ and reported that good delivery required leadership, knowledge and resources. 
The Council was ranked as ‘satisfactory’ by Audit Scotland in managing the 2022 NFI exercise.
6

Page 7

Within the Audit Scotland report, 3 recommendations were made for participating bodies as
follows:- 
 ensuring that an appropriate level of resource was available to deliver NFI follow-up
activities in an efficient and effective manner, in line with local priorities
 using the NFI Self-Appraisal Checklist as part of the 2024/2025 exercise
 putting in place arrangements for monitoring follow-up activity, and where it was
necessary, seeking to understand reasons for low or nil outcomes 
All 3 recommendations had been acknowledged by the Council and were already implemented.   
The following information was provided in appendices 6 to 8 to the report respectively:- 
 a summary of methodologies in calculations applied to NFI datasets in relation to overall
outcomes from the 2022 NFI exercise
 the NFI Self-Appraisal Checklist for the 2024 exercise
 Audit Scotland’s suggestions for improving efficiencies and effectiveness and associated
checklist 
One of the suggestions from Audit Scotland, as detailed in Appendix 8 to the report, required
action from the Council. This was in relation to ensuring that staff involved in the NFI were kept
up to date with new features of the web application and good practice, by reading the guidance
notes and watching the online training modules before work commenced on matches.  It was
proposed that all NFI users would be directed to complete refresher training where required
ahead of the 2024 NFI exercise. 
The Audit and Compliance Manager responded to members’ questions on various aspects of
the report and, where information was not readily available, undertook to provide this to relevant
members. 
The Committee decided: 
(1) that South Lanarkshire Council’s outcomes from the 2022 National Fraud Initiative (NFI)
exercise be noted; 
(2) that the summary of Audit Scotland’s NFI exercise report be noted; and 
(3) that the action highlighted in Appendix 8 to the report be agreed. 
[Reference:  Minutes of 23 June 2023 (Paragraph 7)] 
6 Financial Resilience and Sustainability 
A report dated 2 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on:- 
 the Council’s financial outlook, financial resilience and sustainability
 how risks posed by the financial challenges would be responded to 
A report had been presented to the Executive Committee on 26 June 2024 which detailed the
2025/2026 to 2027/2028 Revenue Budget Strategy.  The report to the Executive Committee had
highlighted that the Chartered Institute of Finance and Public Accountancy (CIPFA) had
introduced a Financial Management Code (the FM Code) for implementation by 31 March 2021. 
The FM Code provided guidance for good and sustainable financial management in local
authorities.  
7

Page 8

Compliance with the principles and standards within the Code would enable local authorities to
demonstrate financial sustainability.  A key goal of the FM Code was to improve and evidence
the financial resilience of organisations by embedding enhanced standards of financial
management. 
In the Annual Audit report for 2023/2024, which was presented earlier on the agenda, it was
acknowledged that given the scale of the financial challenges, there was an opportunity to
enhance focus on financial resilience, which included:- 
 greater emphasis on reserves
 clear financial resilience indicators and measures
 alignment to risks, ensuring there was a clear financial strategy to support a resilient
council 
The Revenue Budget Strategy report to the Executive Committee on 26 June 2024 had detailed
that a further report would be presented to the Risk and Audit Scrutiny Committee which would
provide further information on the Council’s resilience.  Detailed information was provided on:- 
 the financial position and plan for 2025/2026 to 2027/2028 at section 4 of the report
 financial resilience and a summary of the Financial Resilience Framework at section 5 and
Appendix 1 to the report 
The review of financial resilience was key to understanding the financial risks to the Council. 
The Financial Strategy was the way in which the Council managed a number of those key risks
which directly impacted on the money available to deliver Council outcomes. 
Officers responded to members’ questions on various aspects of the report.   
The Committee decided: 
(1) that the Financial Position and Plan for 2025/2026 to 2027/2028, as detailed in section 4 of
the report, be noted; and 
(2) that the Financial Resilience Framework, as detailed in section 5 and Appendix 1 of the
report, be noted. 
[Reference: Minutes of the Executive Committee of 26 June 2024 (Paragraph 9) and Minutes of
the Performance and Review Scrutiny Forum of 27 August 2024 (Paragraph 6)] 
7 Internal Audit Activity as at 30 August 2024 
A report dated 6 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on work completed by Internal Audit during the period 1 June to 30 August 2024. 
Findings from internal audit assignments were reported to this Committee throughout the year
and the last progress report was considered by this Committee on 25 June 2024.  Information
was provided for Internal Audit work completed during the period 1 June to 30 August 2024.   
As at 30 August 2024, 72% of the 2024/2025 Audit Plan was in progress.  Assignments
completed in the period 1 June to 30 August 2024, together with a summary of overall
assurances, were detailed in Appendix 1 to the report.  Key performance indicators for the
period to August 2024 were included in Appendix 2 to the report.  
8

Page 9

The Council formed part of the Glasgow City Region City Deal which funded a range of capital
projects within South Lanarkshire.  At the August 2024 meeting of the Cabinet, audit reports had
been presented on:- 
 Internal Audit Review Shared Prosperity Fund (SPF), Assurance Framework Compliance
 2023/2024 Internal Audit Report and Annual Governance Statement 
Links to those reports were provided at paragraph 5.1 of the report.  The audit of SPF,
Assurance Framework Compliance sought to obtain assurance that member authorities were
complying with the requirements outlined in the SPF Assurance Framework and that an
adequate audit trail was being maintained.  Further details were provided in paragraphs 5.2 and
5.3 of the report.  The 2023/2024 Internal Audit Report and Annual Governance Statement had
provided a positive audit opinion for the year ended 31 March 2024. 
An update was also provided on progress against the Audit Strategy which was a requirement of
the Public Sector Internal Audit Standards (PSIAS).  Delivery of the 2024/2025 Strategy would
be evidenced by the completion of the Internal Audit Plan in year, and monitored during the year
by performance indicators which were regularly reported to the Committee 
The Committee decided: that progress on Internal Audit activity be noted. 
[Reference:  Minutes of 25 June 2024 (Paragraph 7)] 
8 Fraud Statistics Annual Report 2023/2024 
A report dated 6 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on fraud statistics for the year to 31 March 2024 and comparing those figures
with the previous year’s statistics. 
The number, types, outcomes and costs of fraud investigations, together with performance
measures for the year to 31 March 2024, were detailed in the report. A comparison to the
statistics for the same period in the previous year was also provided. Those statistics highlighted
that:- 
 101 fraud investigations, with a total value of £32,000, had been reported in the period,
representing an increase in both number and value from the previous year
 66 cases were closed in the period of which:-
 19 were founded
 28 had insufficient information
 19 were unfounded
 of the 19 founded allegations, 18 were external and one was internal   
On conclusion of all internal investigations, an assessment would be made on whether
improvement actions were necessary. If required, an improvement plan would be issued with
recommended actions. The plan would be agreed with the relevant Heads of Service and the
actions followed up by Internal Audit to ensure implementation and that gaps had been
addressed.  Outcomes for concluded investigations would be reported to this Committee as part
of Internal Audit’s annual assurance report. 
The Committee decided: that the contents of the report be noted. 
[Reference:  Minutes of 30 January 2024 (Paragraph 4)] 
9

Page 10

9 Year End Insured Risk Report 2023/2024 
A report dated 2 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the Council’s insurance claims for the year to 31 March 2024 for the following
main classes of insurance:- 
 combined liability (covering both public liability and employer’s liability) 
 motor insurance
 property insurance and other miscellaneous risks 
Appendix 1 to the report provided annual comparisons of the numbers and values of claims by
Resources for the years 2019/2020 to 2023/2024.  Claims costs had fluctuated over the last 5
years. On average, over that period, the self-insured cost of claims per annum was £2.444
million, however, the costs for 2023/2024 were above average at £3.548 million. The figures for
2023/2024 had been impacted by a number of significant storm events, with the self-insured
estimated cost of those 4 losses being £0.801 million. Inflation, increased costs of materials, car
parts and repair charges had also impacted on claim values. 
Appendix 2 to the report compared claim numbers and costs for 2023/2024, at 31 March 2024,
with the equivalent position for 2022/2023. This showed an increase of 7 claims (1%) on the
numbers reported in 2022/2023 and an increase in the cost of claims from £2.475 million in
2022/2023 to £3.548 million in 2023/2024.  This represented an increase of £1.073 million (43%)
which was a result of the damage to council properties from 4 significant storm events that
occurred over the winter period. 
Appendix 3 to the report provided a further breakdown of public liability claims and costs
specifically for Roads and other services within Community and Enterprise Resources. 
Information was also provided in sections 7 to 9 of the report on:- 
 motor claims
 property claims
 the areas of work which had been progressed over the last year to mitigate insurance
hotspots 
The Insurance and Risk Management Adviser responded to members’ questions on various
aspects of the report and undertook to respond to relevant members on specific claim enquiries. 
The Committee decided: that the Insured Risks Report for the year ended 31 March
2024 be noted. 
[Reference:  Minutes of 22 August 2023 (Paragraph 5)] 
10 Year End Risk Management Report (2023/2024) and Review of Council’s Top
Risks (2024/2025) 
A report dated 5 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on:- 
 progress with risk management activity undertaken during 2023/2024
 the Council’s top risk register following the review and consultation process
 the Risk Management Strategy following a review process  
10

Page 11

Annual reviews of the Council’s top risks were undertaken, with the findings of the last review
reported to the Committee on 31 October 2023.  This year’s full review commenced in April
2024 and the consultation had sought views from Heads of Service, elected members and
trades unions on new areas of risk.   
Risk Sponsors were required on an annual basis to assess their Resource’s compliance with the
Risk Management Strategy and provide supporting evidence.  The information for 2023/2024
was summarised in the end of year compliance statement, which was detailed in Appendix 1 to
the report.  Resources continued to demonstrate full compliance with the Strategy, having
scored 45 out of 45.   
The progress made in delivering actions to control the Council’s top risks was detailed in section
5 of the report.  As at 31 March 2024, the percentage of actions completed on the 2023/2024
risk control plan was 94.4% against an overall target of 90%.  One action, in relation to
developing neighbourhood plans in East Kilbride and Hamilton, had been delayed and carried
forward to the 2024/2025 risk control plan. 
The annual review, in line with previous years, did not result in wholesale changes to the top risk
register.  The risks from the previous year’s review, as detailed in the report to this Committee
on 31 October 2023, were still deemed to be valid. 
The results of the review of the Council’s top risks 2024/2025 were detailed in section 6 of the
report.  The main changes to the risk profile from the previous year were:- 
 2 new risks had been added to the top risk register:-
 the Council inherited commercially unviable shopping centres due to the financial
failure of existing owner/management companies resulting in significant financial and
operational liabilities transferring to the Council
 the Council failed to comply with its statutory duties by not conducting sufficiently
robust impact assessments where the same were required, including in respect of
budget/service redesign proposals, leading to potential legal and financial
challenges, which could result in failure to deliver those proposals
 some key risk wordings had been updated to reflect the current status of risks and/or to
provide more straightforward and understandable risk descriptions
 the risk score for ‘Inability of the Council to effectively provide accommodation and support
to households who were homeless and people who arrived in South Lanarkshire as part of
refugee resettlement and the asylum seeker dispersal programmes, (including those for
unaccompanied children)’ had increased from 16 to 20. This was consistent with the
difficulties faced managing the risk, reflected in the Council’s recent declaration of a
housing emergency
 the risk score for ‘Inability to take the necessary action due to funding constraints, to
combat climate change, and work toward achieving net zero carbon emissions by 2045,
thereby contributing to negative and irreversible environmental, social and economic
impacts on the Council and its residents’ had increased from 16 to 20, reflecting funding
constraints and difficulties faced by the Council in meeting climate change targets
 the risk score for ‘Fraud, theft, organised crime and cyber attacks’ had increased from 12
to 20. Whilst controls in this area had been assessed as adequate, the threat landscape
was very active at the moment and showed no signs of easing
 the residual score for ‘The Council does not fully deliver the strategic outcomes required of
the Integration Joint Board (IJB) as outlined in their Strategic Commissioning Plan’ had
increased from 16 to 20, due to the requirement to implement significant savings to
address budget shortfalls alongside significant demand pressures
 the residual risk score in respect of ‘Lack of capacity and skills to meet increased service
demands’ had increased from 9 to12 in light of a shift in supply/demand of officers and
recruitment difficulties
11

Page 12

 the risk score for ‘Increasing levels of adverse weather’ had gone up from 9 to 16.  This
reflected more frequent issues being encountered by the Council as a result of weather-
related events, including significant damage to council properties over recent years as a
result of storms and burst pipes.  Weather events were also impacting upon the Council’s
property insurance premiums and level of uninsured excesses carried
 the risk score had reduced from 16 to 9 in relation to the ‘Implications of the Scottish Fire
and Rescue Service Unwanted Fire Alarm Signals Policy within the Council's non-domestic
estate’ risk
 the ‘Community Wealth Building Strategy’ risk score had reduced from 16 to 9 which
aligned this risk with the risks for the Council’s other plans and strategies
 the ‘IT development/functionality’ risk description had been widened to encompass
implementation of new systems.  This reflected the 3 significant IT projects which
continued to be progressed at present for the Integrated Housing Management System,
the SWIS+ replacement (Liquidlogic) and Oracle Fusion 
The Council’s top risk register was monitored on an ongoing basis and updates were reported
annually to this Committee.  Risk scores and rankings would be amended if new information
came to light that allowed the position to be reassessed.  The top Risk Register for 2024/2025
was attached as Appendix 2 to the report. 
Details were provided at section 7 of the report on a benchmarking exercise that had been
conducted by the Scottish Local Authority Chief Internal Auditors Group (SLACIAG) in
December 2023.  A total of 28 public sector organisations, including South Lanarkshire Council,
had taken part in the exercise.  Details were also provided at paragraphs 7.2 to 7.5 of the report
on the AON Global Risk Management Survey, which was published within ALARM Stronger
Journal in April 2024. 
Horizon scanning was used to identify several areas that could pose potential threats and risks
or emerging issues and opportunities that could affect the Council.  Areas identified, as detailed
in section 8 of the report, included Transformational Change, Scotland Excel Supply Chain
Intelligence Report and Artificial Intelligence.  Those areas would continue to be monitored to
ensure the Council was adequately prepared to respond where required. 
Details were also provided in sections 9 and 10 of the report on the following areas:- 
 the ‘Three Lines Model’ work being undertaken by Internal Audit. This was now concluding
and Resource Risk Sponsors would be provided with individual analysis and guidance to
support in developing further controls and in closing gaps for the Council top risks
 the scope and appetite for risk which included the top risks heat map and the top risks
profile 
To comply with best practice, and to ensure it was fit for purpose, a review of the Risk
Management Strategy had been undertaken, as detailed in section 11 of the report.  There were
no fundamental changes to the Strategy, however, the main revisions were summarised in
paragraph 11.2 of the report.  The updated Risk Management Strategy was attached at
Appendix 3 to the report.   
The Committee decided: 
(1) that Resource compliance with the requirements of the Risk Management Strategy be
noted; 
(2) that the progress being made in delivering actions to mitigate top Council risks be noted; 
(3) that the updated Council’s top risks, as detailed in section 6 of the report, be noted; and
12

Page 13

(4) that the updated Risk Management Strategy be noted. 
[Reference:  Minutes of 31 October 2023 (Paragraph 8)] 
11 Forward Programme for Future Meetings 
A report dated 26 August 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the outline forward programme for the meetings of the Risk and Audit Scrutiny
Committee to 30 September 2025. 
As part of future arrangements, members were invited to suggest topics for inclusion in the
Committee’s forward programme. 
The Committee decided: that the outline forward programme for the meetings of the
Risk and Audit Scrutiny Committee to 30 September 2025
be noted. 
[Reference:  Minutes 25 June 2024 (Paragraph 10)] 
12 Urgent Business 
There were no items of urgent business. 
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 19 November 2024 
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Internal Audit Activity as at 31 October 2024     
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update the Risk and Audit Scrutiny Committee (RASC) on progress of the Internal
Audit service in the period 31 August to 31 October 2024 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that progress is noted. 
3. Background 
3.1. Findings from internal audit assignments are reported to the Committee throughout
the year. The last progress report to the Committee was in September 2024 and
reported on work completed in the period 1 June to 30 August 2024. This report
covers all work completed in the period 31 August to 31 October 2024.  Performance
information is also included. 
4. Delivery of the Internal Audit Plan: Progress and Performance
4.1. As at 31 October 2024, 89% of the 2024/2025 Audit Plan is in progress.  Of the 89%
of assignments started, 32% relate to assignments that are delivered over the course
of the year.  There has been significant progress in these areas including the
successful upload of all requested datasets for the 2024 National Fraud Initiative
exercise that commenced in September 2024. 
4.2. Appendix 1 lists all assignments completed in the period 31 August to 31 October
2024 together with a summary of overall assurances from each area of work. 
4.3. Key performance indicators for the period to 31 October 2024 are included at
Appendix 2. 
4.4. Members are asked to note progress. 
5. Global Internal Audit Standards 
5.1. The Internal Audit function within South Lanarkshire Council is required to comply
with the Public Sector Internal Audit Standards in its delivery of an internal audit
service.  Members will be familiar with reference to these Standards within reports
presented to the Committee.  From April 2025, these Standards will be replaced by
the Global Internal Audit Standards (UK Public Sector).  These new standards have
two elements, the Global Internal Audit Standards (GIAS) and an Application Note:
3
15

Page 16

Global Internal Audit Standards in the UK Public Sector which will be supplemented
by a CIPFA Code of Practice on the Governance of Internal Audit in Local
Government.  A separate report on the new Standard, Application Note and Code of
Practice will be presented to the Committee in February 2025.  A brief overview is
set out in paragraphs 5.2 to 5.7 below. 
5.2. The Code of Practice is a practical interpretation of the new Standards with an
intention to provide clarity to audit committees and senior management on their role;
to provide confidence to internal auditors that they can satisfy the requirements of
the new internal audit standards; to provide a relevant interpretation of the new
standards for UK local government and to ensure a consistent approach throughout
the sector. 
5.3. These new Standards will apply to all Public Sector bodies’ internal audit functions. 
The annual Internal Audit report presented to Committee from 2025/2026 will include
a statement that the function has conformed with GIAS in delivering the internal audit
service during the year.  There will continue to be a requirement for compliance to be
periodically, externally assessed and reported to audit committees.  A statement
around compliance will also now be required to be included in the Council’s annual
governance statement from 2025/2026. 
5.4. These new Standards will apply to the 2025/2026 Internal Audit Plan that will be
presented to this Committee on 18 February 2025.  The Plan, when presented, will
be accompanied by a mandate, charter and strategy.  The authority of the function
will be set out within the charter and mandate and will seek Committee support to
allow the function “to be effective and to meet the requirements of professional
standards” and “to apply their mandate and charter in practice and meet
expectations”. 
5.5. The Code of Practice also sets out the responsibility to position Internal Audit
independently, demonstrated by organisational independence and to ensure that
there is effective leadership of the function by a qualified and experienced chief audit
executive.  To ensure the internal audit function’s effectiveness, the Code expects an
overview by the audit committee such that it can satisfy itself that sufficient resources
are available to deliver an effective internal audit service. 
5.6. Arrangements to review annual conformance are set out within the Code along with
a continuation of the arrangement for this to be assessed independently once in
each 5-year period.   
5.7. Within South Lanarkshire Council, work is underway to ensure that the internal audit
function complies with these new Standards from April 2025 and is able to deliver an
internal audit service that aligns to both professional standards and best practice. A
detailed report around wider requirements and responsibilities, set out within the new
Standards, will be presented to this Committee in February 2025 to ensure that the
organisation continues to demonstrate compliance with internal audit standards. 
6. Internal Audit Plan 2025/2026
6.1. Work has commenced to prepare the 2025/2026 Internal Audit Plan. Consultation
exercises involving Council Resources and External Audit are being progressed and
will conclude by the end of the calendar year to discuss ideas and suggestions for
inclusion in the Plan.  Suggestions are also being sought from the Risk and Audit
Scrutiny Committee. These should focus on strategic or top risk areas where there
are known control weaknesses. 
16

Page 17

6.2. Once the consultation process has been concluded, the comprehensive list of audits
will be risk assessed and an audit plan presented to the Committee for approval that
ensures adequate coverage across all risk areas and is sufficient to inform an annual
audit opinion.   
7. Progress against Strategy
7.1. The Public Sector Internal Audit Standards (PSIAS) require progress against the
audit strategy to be monitored and reported to the Committee as part of regular
monitoring reports that are presented at each meeting. 
7.2. Delivery of the strategy in 2024/2025 will be evidenced by the completion of the
Internal Audit Plan in-year and will be monitored through the performance indicators
regularly reported to the Committee. 
8. Employee Implications 
8.1. There are no employee issues. 
9. Financial Implications
9.1. A breakeven position for 2024/2025 is forecast at the end of the financial year for the
Internal Audit section. 
10. Other Implications
10.1. The main risks to the delivery of the Audit Plan are, generally, vacancies and team
up-skilling requirements, unforeseen service demands and delays with client sign-off. 
These are mitigated by coaching and training, regular meetings and escalation
processes as well as inclusion of contingency time within the annual plan.  The risk
of significant, subsequent amendments to the Plan, arising from a change in the
Council’s priorities or risks, are mitigated by regular re-assessment of capacity and
Audit Plan content to allow incremental adjustments as the year progresses. 
10.2. There are no implications for sustainability in terms of the information contained in
this report. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. There is no requirement to equality assess the contents of this report. 
11.2. Heads of Service are consulted on each and every audit assignment. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
1 November 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Risk and Audit Scrutiny Committee – 26 March 2024 – 2024/2025 Internal Audit Plan
 Risk and Audit Scrutiny Committee – 24 September 2024 – Internal Audit Activity as at
30 August 2024 
17

Page 18

List of Background Papers
 Figtree extracts of Action Plans 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Yvonne Douglas, Audit and Compliance Manager
Tel:  01698 452618)
E-mail:  yvonne.douglas@southlanarkshire.gov.uk 
18

Page 19

Assignments completed 31 August to 31 October 2024   Appendix 1 
Job
Number Assignment name
Draft
Issue Final Issue Assurance Info
I674223 Supplier Expenditure Data
Analysis
01/06/2024 22/10/2024 Data analysis shared
for further review and
action.
I674229 Whistle Blowing Concerns 06/08/2024 30/10/2024 Concerns referred to
various Council
Services.  No
significant issues
identified with some
areas being
considered for further
action if necessary.
I674230 External report 08/10/2024 08/10/2024 Preparation of report
for external
organisation. 
19

Page 20

Key audit performance indicators as at 31 October 2024           Appendix 2 
Indicator Numbers Percentage Target Comment
Assignments
delivered within
budget
5/5 100% 80% 
Draft reports
delivered within 6
weeks of file
review 
5/5 100% 80% 
2024/2025 Audit
Plan completed
to draft by 30
April 2024
5/44 11% 100% 39/44 (89%) of 2024/2025 Audit Plan in progress at 31 October 2024.
Internal Audit
recommendations
delivered on time
5/5 100% 90% 
Client to agree
findings and
actions within 4
weeks of draft
issue
5/5 100% 80% 
20

Page 21

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 19 November 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Audit Scotland – Transformation In Councils 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide the Risk and Audit Scrutiny Committee with a summary of the information
contained within the Audit Scotland Transformation In Councils briefing, published
in October 2024 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the key messages from the Audit Scotland report entitled ‘Transformation
in Councils’, as detailed in section 4 of the report, be noted; and
(2) that the Council’s position in relation to these key messages, as detailed in
section 5 of the report, be noted. 
3. Background
3.1. In October 2024, Audit Scotland published a report titled Transformation in Councils
on behalf of the Accounts Commission. The introduction and key messages from the
report are outlined in section 4 including consideration of the requirement for
transformation and the actions required to progress it. 
3.2. Section 5 summarises the Council’s position in relation to these key messages and its
progress in relation to Transformation, will be detailed for members’ information. 
4. Key Messages from the Audit Scotland Report
4.1. This report is part of a series of outputs produced by the Accounts Commission that
provide an independent overview of the local government sector. It provides an insight
into how the sector is responding to a key challenge currently facing local government
and looks at the role that transformation and collaboration can play in helping councils
to achieve financial sustainability. 
4.2. This report sets the scene for the analysis of plans for transformation at an individual
council level. This will then be captured as part of the Best Value thematic focus in the
2024/2025 annual audit, with the national Best Value thematic report on transformation
scheduled for 2026. 
4.3. Financial sustainability is an issue that extends across the whole public sector. This
report complements work planned by the Auditor General for Scotland on the Scottish
Government’s approach to fiscal sustainability and reform due for publication later this
year. 
4
21

Page 22

4.4. A number of key messages are presented by Audit Scotland in part 1 of their report in
relation to Transformation in Councils.  Each is taken in turn. 
a. As financial and service demand challenges continue to deepen, councils
know they urgently need to transform how they deliver services.
Transformation in local government has been happening for decades, but a step
change is now urgently required. Councils face barriers to transformation and
progress has been slow, but reform is vital and must happen at greater pace and
scale. Not doing so puts the sustainability of vital public services at risk.  
b. To meet these challenges, the Society of Local Authority Chief Executives (Solace)
and the Improvement Service have put in place a sector-led Transformation
Programme focused on developing proposals for a future operating model for
councils through short-term transformation projects, dialogue with public sector
partners and a forum for developing leadership capabilities. 
c. Councils cannot deliver transformation alone and it is essential that the
Scottish Government and Community Planning and third sector partners support
the transformation of local services through more effective collaboration. Achieving
consensus on the longer-term vision for local services is crucial. Faster progress
in delivering the aims of the Verity House Agreement (VHA) should also aid the
development and delivery of sector-led and local transformation work. 
d. Public and political support is critical. All elected members must exercise their
responsibilities to give clarity on the longer-term vision and ambitions of the
councils they represent. A coordinated sector-wide public engagement and
communication campaign should be undertaken to help gain backing from
communities. To deliver on the change now urgently needed, councils must
prioritise both capacity and capability in their workforces to match the ambition and
pace needed to transform. This is highly challenging given the significant pressures
they face to deliver day-to-day services. 
4.5. Part 2 of the Audit Scotland report provides more detail on the transformation required
to become financially sustainable and the urgent action required to progress
transformation.  Points of interest and background information not covered in the
report’s key messages are provided below.   
4.6. Audit Scotland Reports:  Audit Scotland have recently issued a number of reports
noting that councils face significant financial sustainability challenges, placing vital
public services at risk. These are listed in the List of Background Papers section at the
end of this report.  They reported last year that councils have never faced such a
challenging situation, with increasing demand, workforce pressures and council
budgets under severe strain. Their most recent assessment of councils’ financial
position was that the financial outlook is extremely challenging and presents real risks
for the future. 
4.7. Their local government budgets report found that councils have had to make difficult
budget-setting decisions for 2024/2025 and that the budget gap is estimated to rise
again into 2026/2027 while their recent report on the local government benchmarking
framework showed how the pace of improvement in council services is slowing. 
4.8. As a result, they have developed some principles to help guide all councils around
their expectations for transformational activity at a council level, while allowing for the
flexibility required. They expect all councils to follow these principles:- 
22

Page 23

 Vision - Have a clear vision that sets out the intended end state of any
transformation activity
 Planning - Be clear on the scale of the change required and ensure
transformation plans are sufficiently ambitious to credibly respond to the scale of
the challenge
 Governance - Put in place effective governance and escalation processes so that
the transformation activities are well managed in their own right, but also able to
be given priority alongside other business-as-usual activities
 Collaboration - Develop better working relationships with communities and/or
partners to achieve a sustainable model of service delivery
 Innovation - Implement new ways of thinking, including innovation, creativity and
a desire, willingness, and action to change and do things in new and different
ways that achieve the outcomes needed 
4.9. Updates on the Transformation Programme: Audit Scotland note that the main
sector-led piece of work to help councils reform how they deliver services is the
Transformation Programme launched by Solace and the Improvement Service in
September 2023. The Transformation Programme is still in the early stages, but good
progress has been made in engaging with most councils and a small number of other
public service bodies on the programme. 
4.10. Work began on 6 focused 12-to-18-month projects in January 2024. These are aimed
at helping councils achieve savings and identify longer term solutions and set the
foundation for longer term collaboration. The 6 short-term projects are:- 
 collaboration within the local government sector on procurement
 analysis of local government’s statutory and discretionary services
 the full implementation of Crerar for Local Government
 development of a Digital To-Be State for Scottish Local Government
 identification of new digital shared services that could be delivered nationally or
regionally
 repository of examples of active communities/participatory design 
4.11. These projects are at an early stage of development.  Although the projects are short
term, it is likely that some could take years to implement and for the benefits to be
realised, particularly if legislative changes are required. 
4.12. Building Capacity to Lead and Deliver Transformation:  Council chief executives
have established a Leadership Practitioner Forum aimed at aspiring chief executives,
directors, and heads of service, to facilitate collaboration on the Transformation
Programme and to develop leadership capabilities for the future. Thirty of the 32
councils have engaged to date. 
4.13. Officer Led Conversation on Public Sector Reform:  This workstream aligns with
the Verity House Agreement and focuses on the need for behaviours and actions to
change to collaborate effectively on reform. It aims to implement radical public sector
reform over the next three to five years. Twenty-eight of the 32 councils have engaged
so far. Local authority chief executives have demonstrated a clear desire to work with
other public sector agencies and have taken steps to initiate dialogue with partners.
There must be clarity on how they will agree a vision and timeline for transformation
across the sector.  
23

Page 24

4.14. Risks to the overall delivery of the Transformation Programme:  The Audit
Scotland reported noted a number of risks that could impact on delivery of the
Transformation Programme.  While programme, workstream and project
documentation is in place for most activity, there is not yet sufficient detail on
timescales, costs, resources, outcomes, outputs, and impact on the overall
programme aims. These could provide reassurance and clarity for councils’ medium
to longer-term planning.  Clarity on resources includes the transition from the
Improvement Service to councils for the implementation stage, and this suggests that
councils should consider how to allocate staff resources to best build momentum with
the programme and to minimise the risk of missing targets. 
4.15. Cosla’s Role in Facilitating Transformation:  COSLA established the ‘Innovating
Developing and Transforming’ special interest group (SIG) to facilitate collaboration
between political leaders, the Scottish Government and other key public sector
partners. In April 2024, it agreed it would be the key stakeholder group for political
engagement and monitoring progress on transformation work. While it is too early to
see the impact of SIG’s role in sector-led transformation work, it has potential to be an
important mechanism for gaining political consensus on what the future of local
government looks like as well as the potential to facilitate better sector-wide public
engagement and collaboration between local and national government. 
5. South Lanarkshire Council Position
5.1. The Elected Members of the Council are regularly briefed on the financial challenges
that lie ahead.  A 3-year Budget Strategy was presented to the Council’s Executive
Committee in June 2024, which clearly set out the scale of the task ahead.   
5.2. That paper included reference to a Transformational Change Programme to assist in
bridging the Budget Gap.  Transformation is not new to the Council as we have
undertaken service reviews for many years. The current Transformational Change
Programme includes both Cross-Cutting and Resource Reviews and has been
instrumental in identifying saving proposals for consideration by Elected Members as
part of the Budget Setting process for 2025/2026 onwards.   
5.3. The Cross-Cutting Reviews have been reported to the Council’s Performance and
Review Scrutiny Forum and Elected Members have visibility on the cross-council
changes being proposed in respect of the ongoing reviews including management
structures, procurement, digital transformation (including customer contact) and the
overall property estate of the Council.  These reviews are looking at new ways to
deliver services including the use of technology to support change and to do things in
new and different ways to achieve the outcomes required. 
5.4. Engagement with the public, elected members and partners is a key part of the
Council’s Budget Setting process. An Elected Members’ seminar has already been
held to explain the Budget position for the coming 3 years, and how the
Transformational Change Programme can assist the Council in setting a balanced
budget. 
5.5. As in previous years, the 2025/2026 Budget Communication Strategy has been
developed and will explain to the public the financial challenges faced by the Council.
Similarly, this year’s Public Consultation detail the Council’s Budget position and will
seek the public’s views on the savings proposed by officers. 
6. Employee Implications
6.1. None.
24

Page 25

7. Financial Implications
7.1. The Audit Scotland Report raises a number of financial areas for consideration by
councils, however, there are no direct financial implications as a result of the content
of this report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. None. 
10. Integrated Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no integrated impact
assessment is required.  There is also no requirement to undertake any consultation
in terms of the information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
28 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Local government budgets 2024/25. Audit Scotland, May 2024. 
List of Background Papers
 Local government Overview 2023. Audit Scotland, May 2023.
 Local government in Scotland: Financial bulletin 2022/23. Audit Scotland, January 2024.
 Local government budgets 2024/25. Audit Scotland, May 2024.
 Local Government Benchmarking Framework annual report 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: 
Jackie Taylor, Executive Director (Finance and Corporate Resources)
Ext:  5637 (Tel:  01698 455637)
E-mail: jackie.taylor@southlanarkshire.gov.uk
25

Page 26

26

Page 27

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 19 November 2024 
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Forward Programme for Future Meetings 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the forward programme for the meetings of the Risk and Audit
Scrutiny Committee to 9 December 2025
 invite members to suggest topics for inclusion in the Committee’s forward
programme
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the report and the outline forward programme for the meetings of the Risk
and Audit Scrutiny Committee to 9 December 2025, attached as an Appendix
to the report, be noted.
[1recs]
3. Background
3.1. As part of a range of improvement measures introduced as a result of Audit
Scotland’s report on the Audit of Best Value and Community Planning (2009), an
Action Plan was prepared.  One of the actions was to include, as a standard agenda
item, a list of items proposed for consideration at subsequent meetings of this
Committee to provide an opportunity for members to inform future agendas.  The
outline forward programme to 9 December 2025 is attached, for members’
information, as an Appendix to the report.  
4. Employee Implications
4.1. There are no employee implications. 
5. Financial Implications
5.1. There are no financial implications. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability or Environmental implications in terms
of the information contained within this report. 
7. Other Implications 
7.1. There are no risk implications in terms of the information contained within this report.
5
27

Page 28

8. Equality Impact Assessment and Consultation Arrangements
8.1. The report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
1 November 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee 8 July 2009 
List of Background Papers
 Audit Scotland Audit of Best Value and Community Planning 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elizabeth-Anne McGonigle, Administration Adviser
Tel:  0738 5403101
E-mail:-  elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
28

Page 29

APPENDIX – RASC OUTLINE FORWARD PROGRAMME 
Meeting Date Item Responsibility   
18 February 2025 Internal Audit Activity Report Audit and Compliance
Manager   
Performance and Review Scrutiny
Forum Annual Update
Head of Communications
and Strategy   
2025/2026 Internal Audit Plan Audit and Compliance
Manager   
Global Internal Audit Standards Audit and Compliance
Manager 
Fraud Statistics Six Monthly
Update 2024/2025 
Audit and Compliance
Manager 
Good Governance Update Head of Administration and
Legal Services 
Annual Audit Plan External Audit   
6 May 2025 Internal Audit Activity Report Audit and Compliance
Manager 
2024 NFI Exercise Audit and Compliance
Manager 
Audit Scotland – Financial Bulletin
2023/2024
Head of Finance (Strategy)   
Financial Resources Scrutiny
Forum Activity
Head of Finance (Strategy)   
25 June 2025 Internal Audit Assurance Report
2024/2025
Audit and Compliance
Manager   
Annual Governance Statement for
2024/2025 and Significant
Governance Areas Quarter 4
Progress Report 
Audit Scotland: Best Value
Thematic Report
Head of Administration and
Legal Services 
External Audit   
Unaudited Annual Accounts
2024/2025
Head of Finance (Strategy)   
Interim Management Report External Audit   
Internal Audit Activity Report Audit and Compliance
Manager
29

Page 30

30 September 2025 External Auditor’s Annual Report to
South Lanarkshire Council
2024/2025
External Audit   
Audited Annual Accounts
2024/2025
Head of Finance (Strategy)   
Internal Audit Activity Report Audit and Compliance
Manager   
Year End Insured Risks Report
2024/2025 
Head of Finance
(Transactions) 
Year End Risk Management Report
2024/2025 and Review of Council’s
Top Risks 2025/2026
Head of Finance
(Transactions)  
Fraud Statistics Annual Report
2024/2025 
Audit and Compliance
Manager   
9 December 2025 Internal Audit Activity Report Audit and Compliance
Manager   
Audit Scotland Report: Local
Government in Scotland Overview
2024
Head of Communications
and Strategy   
Performance and Review Scrutiny
Forum Annual Update 
Head of Communications
and Strategy 
Good Governance Update Head of Administration and
Legal Services 
N.B:- Audit Scotland national studies and reviews will appear as a recurring item but the
frequency and subject matter will vary according to their programme. 
30