Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 16 September 2024 
Dear Councillor 
Risk and Audit Scrutiny Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 24 September 2024
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Elaine McDougall (Chair), Mary Donnelly (Depute Chair), Mathew Buchanan, Alistair Fulton, Ross
Gowland, Celine Handibode, Cal Johnston-Dempsey, Susan Kerr, Richard Lockhart 
Substitutes
Colin Dewar, Gavin Keatt, Monique McAdams, Helen Toner 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of  Previous Meeting
Minutes of the meeting of the Risk and Audit Scrutiny Committee held on 25
June 2024 submitted for approval as a correct record.  (Copy attached) 
5 - 10 
Monitoring Item(s) 
3 External Auditor's Report 2023/2024
Letter and report dated 24 September 2024 by Audit Scotland, External Auditors
to the Council.  (Copy attached) 
11 - 66 
4 External Auditor's Report 2023/2024. South Lanarkshire Council Charitable
Trusts
Letter and report dated September 2024 by Audit Scotland, External Auditors to
the Council.  (Copy to follow) 
Item(s) for Decision 
5 Audited Annual Accounts 2023/2024
Report dated 10 September 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
67 - 70 
6 2022 National Fraud Initiative Exercise
Report dated 6 September 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
71 - 92 
Item(s) for Noting 
7 Financial Resilience and Sustainability
Report dated 2 September 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
93 - 102 
8 Internal Audit Activity as at 30 August 2024
Report dated 6 September 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
103 - 108 
9 Fraud Statistics Annual Report 2023/2024
Report dated 6 September 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
109 - 112 
10  Year End Insured Risks Report – 2023/2024
Report dated 2 September 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
113 - 122 
11  Year End Risk Management Report (2023/2024) and Review of Council's
Top Risks (2024/2025)
Report dated 5 September 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
123 - 154
2

Page 3

12  Forward Programme for Future Meetings
Report dated 26 August 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
155 - 158 
Urgent Business 
13  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

RISK AND AUDIT SCRUTINY COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 25 June 2024 
Chair:
Councillor Elaine McDougall 
Councillors Present:
Councillor Mathew Buchanan, Councillor Alistair Fulton, Councillor Ross Gowland, Councillor Cal
Johnston-Dempsey, Councillor Susan Kerr, Councillor Helen Toner (substitute for Councillor Mary
Donnelly) 
Councillors' Apologies:
Councillor Mary Donnelly (Depute), Councillor Celine Handibode, Councillor Richard Lockhart 
Councillor Also Present:
Councillor Joe Fagan (for items 3 to 5) 
Attending:
Chief Executive’s Service
S Sengupta, Acting Depute Chief Executive (for items 3 to 5)
Finance and Corporate Resources
J Taylor, Executive Director; Y Douglas, Audit and Compliance Manager; E-A McGonigle,
Administration Adviser; K McLeod, Administration Assistant; L O’Hagan, Head of Finance
(Strategy); I Strachan, Head of Administration and Legal Services 
Also Attending:
Audit Scotland
A Barclay and M Ferris, External Auditors 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Risk and Audit Scrutiny Committee held on 26 March 2024
were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Internal Audit Annual Assurance Report 2023/2024 
A report dated 4 June 2024 by the Audit and Compliance Manager (Finance and Corporate
Resources) was submitted providing:- 
 a summary of progress and performance of Internal Audit for the financial year 2023/2024
 an opinion on the adequacy and effectiveness of the Council’s framework of governance,
risk management and control systems based on audit work undertaken in 2023/2024
2
5

Page 6

Details were given on:- 
 Internal Audit performance
 Council-wide performance in relation to the delivery of audit actions
 workload analysis
 links to the Council’s objectives and top risks
 management of fraud risks
 areas of assurance
 areas of external reliance 
The UK Public Sector Internal Audit Standards Advisory Board had issued guidance around
conformance with the Public Sector Standards which had shaped the Council’s internal audit
approach in 2023/2024 which aimed to:- 
 provide real-time advice and insight in the development of new systems and controls
 ensure that core internal audit work remained risk-based and relevant 
 allow the regular reporting of activity to this Committee 
The overall opinion expressed on the Council’s control environment was that a reasonable level
of assurance could be placed on the adequacy and effectiveness of the Council’s framework of
governance, risk management and control arrangements for the year ended 31 March 2024. 
The Internal Audit findings would inform the Council’s 2023/2024 Annual Governance
Statement. 
The Committee decided: 
(1) that the performance of Internal Audit during 2023/2024 be noted; 
(2) that the overall findings from internal audit work be noted, and that it be approved that
those would inform the Council’s 2023/2024 Annual Governance Statement; and 
(3) that the level of assurance on the Council’s control environment be noted. 
[Reference:  Minutes of 27 June 2023 (Paragraph 3)] 
4 Annual Governance Statement for 2023/2024 and Significant Governance Areas
Quarter 4 Progress Report 
A report dated 7 June 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the Annual Governance Statement for 2023/2024 and progress against significant
governance areas identified within the 2022/2023 Annual Governance Statement at Quarter 4. 
Each year, the Council undertook a review of the governance arrangements required to support
its financial and operational controls.  This review provided the basis for the Annual Governance
Statement which was included in the Council’s Annual Report and Statement of Accounts. 
The Council’s governance assurance framework was detailed in Appendix 1 to the report.  The
resulting Annual Governance Statement for 2023/2024, attached as Appendix 2 to the report,
provided information on the Council’s compliance during 2022/2023.  The annual review of
governance arrangements across the Council demonstrated sufficient evidence that the
principles of delivering good governance in local government, contained in the Local Code of
Corporate Governance, operated effectively and that the Council complied with its Code. 
Progress on the significant governance areas highlighted within the Annual Governance
Statement 2022/2023 was attached as Appendix 3 to the report.
6

Page 7

The Committee decided: 
(1) that the Annual Governance Statement, attached as Appendix 2 to the report, which would
be included in the 2023/2024 Annual Report and Statement of Accounts, be approved; and 
(2) that the progress against the significant governance areas identified within the Annual
Governance Statement 2022/2023, attached as Appendix 3 to the report, be noted. 
[Reference:  Minutes of 27 June 2023 (Paragraph 4)] 
5 Unaudited Annual Accounts 2023/2024 
A report dated 7 June 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the requirement for members to consider the Unaudited Annual Accounts of the
Council and related Charitable Trusts, attached as appendices 1 and 3 to the report, by 30 June
2024. 
The Council’s Unaudited Annual Accounts detailed key information on the Council’s expenditure
and income for the financial year ended 31 March 2024.  The accounts also covered the 
Charitable Trust managed by the Council, namely South Lanarkshire Council Charitable Trust   
The full Unaudited Annual Accounts would be circulated to all elected members following their
submission to the External Auditor by 30 June 2024 and would be advertised as being available
for public inspection on the Council’s website from 1 July 2024 until the date the Audited
Accounts would be published.   
The information contained in the Unaudited Accounts took into account the final outturn position,
as detailed in Appendix 2 to the report, which was submitted for approval to the Executive
Committee meeting on 26 June 2024.  Appendix 2 also provided an Expenditure and Funding
Analysis, as required by the Chartered Institute of Public Finance and Accountancy (CIPFA)
Code of Accounting Practice. 
Following the audit of the Accounts over the summer months, the Audited Annual Accounts
would be brought back to the Committee at its meeting on 24 September 2024 for approval. 
The Committee decided: that the Unaudited Annual Accounts of the Council and
related Charitable Trusts, to be submitted to Audit Scotland
by the deadline of 30 June 2024, be noted. 
[Reference:  Minutes of 27 June 2023 (Paragraph 5)] 
6 Workforce Innovation – How Councils are Responding to Workforce Challenges:
Best Value Thematic Work in South Lanarkshire Council in 2023/2024 
A report dated June 2024 by Audit Scotland, the Council’s external auditors, was submitted
entitled ‘Workforce Innovation – How Councils are Responding to Workforce Challenges: Best
Value Thematic Work in South Lanarkshire Council 2023/2024’. 
The report set out how the Council was responding to current workforce challenges through
building capacity, increasing productivity and innovation.  The Accounts Commission’s Strategy
(2021 to 2026) had set out its priorities to focus on inequalities, funding, communities and
recovery.  The Code of Audit practice had set out the Best Value work required to report on
those priorities.
7

Page 8

The Senior Audit Manager, Audit Scotland, highlighted the following sections of the report:- 
 key messages
 scope of the audit
 workforce strategy and priorities
 digital technology and the workforce
 flexible working and other innovative staff deployment
 developing future skills and capacity
 joint workforce arrangements across services and partners
 measuring the impact of workforce planning 
The report detailed the following audit recommendations:- 
 the Council should develop a corporate level workforce strategy to demonstrate a clear link
to the Connect Council Plan 2022 to 2027.  The Council should build on the workforce
planning to date and implement a more strategic, data-driven approach to workforce
planning, with SMART action plans, setting out how Council level and service level actions
were being progressed
 the Council should develop measures to capture and monitor the impact of digital
technology on workforce productivity and service outcomes.  It should also set out how it
expected digital technology to shape its future workforce
 the Council should develop an action plan to allow it to monitor progress in addressing
digital exclusion in its workforce and for its citizens 
An improvement action plan, attached as Appendix 1 to the report, set out those audit
recommendations and the Council’s planned response, which included responsible officers and
dates for implementation. 
The Committee decided: that the report be noted. 
7 Internal Audit Activity as at 31 May 2024 
A report dated 5 June 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on work completed by Internal Audit during the period 9 March to 31 May 2024. 
Findings from internal audit assignments were reported to this Committee throughout the year
and the last progress report was considered by this Committee on 26 March 2024.  Key
performance indicators for March 2024, which related to the 2023/2024 Internal Audit Plan, were
included in the Internal Audit Annual Assurance Report 2023/2024 which was considered earlier
on the agenda. 
As at 31 May 2024, 42% of the 2024/2025 Audit Plan was in progress.  Assignments completed
in the period 9 March to 31 May 2024, together with a summary of overall assurances, were
detailed in Appendix 1 to the report.  Two assignments were deferred in 2023/2024 to increase
the time available to support significant system implementations.  Those assignments would be
delivered via the use of contingency time in 2024/2025 or considered for inclusion in a future
year’s audit plan. 
The Council formed part of the Glasgow City Region City Deal which funded a range of capital
projects within South Lanarkshire.  At the May 2024 meeting of the Cabinet, audit reports had
been presented on:- 
 Relationship and Stakeholder Management Audit
 Financial Monitoring Audit
8

Page 9

 Follow Up Audit work
 Internal Audit Plan 2024/2025 
Links to those report were provided at paragraph 5.1 of the report.  The Internal Audit Plan
2024/2025 included 4 separate assignments which were detailed at paragraph 5.5 of the report. 
The findings from those assignments would be reported to the Cabinet during 2024/2025 and a
summary would be included within future reports to this Committee. 
Updates were also provided on:- 
 meetings of the Chief Internal Auditors’ Group which had provided an opportunity to share
best practice and attend presentations on topical issues.  A copy of the Chief Internal
Auditors’ Group 2023/2024 Annual Report was provided at Appendix 2 to the report
 progress against the Audit Strategy which was a requirement of the Public Sector Internal
Audit Standards (PSIAS).  Delivery of the 2024/2025 Strategy would be evidenced by the
completion of the Internal Audit Plan in year, and monitored during the year by
performance indicators which were regularly reported to the Committee 
The Committee decided: that progress on Internal Audit activity be noted. 
[Reference:  Minutes of 26 March 2024 (Paragraph 6)] 
8 Audit Scotland – Financial Bulletin 2022/2023 
A report dated 18 May 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the Audit Scotland report entitled ‘Local government in Scotland: Financial bulletin
2022/2023’ which had been published in January 2024. 
The report had been divided into 2 parts:- 
 councils’ funding and outturn
 councils’ financial position and outlook 
The key messages from the Audit Scotland report were detailed, together with an assessment of
the position in South Lanarkshire Council. 
The Committee decided: 
(1) that the key messages and recommendations contained in the Audit Scotland report
entitled 'Financial bulletin 2022/2023', as detailed in sections 4 and 5 of the report, be
noted; and 
(2) that the commentary on the Council’s position, as included in the Audit Scotland report and
as detailed in section 6 of the report, be noted. 
[Reference:  Minutes of 23 May 2023 (Paragraph 6)] 
9 Financial Resources Scrutiny Forum Activity 
A report dated 24 April 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on reports considered by the Financial Resources Scrutiny Forum in the period from
August 2023 to March 2024.
9

Page 10

A report on the business considered by the Financial Resources Scrutiny Forum would continue
to be submitted to the Risk and Audit Scrutiny Committee on an annual basis. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 23 May 2023 (Paragraph 7)] 
10 Forward Programme for Future Meetings 
A report dated 28 May 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the outline forward programme for the meetings of the Risk and Audit Scrutiny
Committee to 25 June 2025. 
As part of future arrangements, members were invited to suggest topics for inclusion in the
Committee’s forward programme. 
The Committee decided: that the outline forward programme for the meetings of the
Risk and Audit Scrutiny Committee to 25 June 2025 be
noted. 
[Reference:  Minutes 26 March 2024 (Paragraph 7)] 
11 Urgent Business 
There were no items of urgent business. 
10

Page 11

102 West Port
Edinburgh 
EH3 9DN
8 Nelson Mandela Place
Glasgow 
G2 1BT
The Green House
Beechwood Business Park North
Inverness
IV2 3BL
T: 0131 625 1500
E: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk 
Risk and Audit Scrutiny Committee
24 September 2024
South Lanarkshire Council
Audit of 2023/24 annual accounts 
Independent auditor's report
1.  Our audit work on the 2023/24 annual accounts is now substantially complete. Subject to
receipt of a revised set of annual accounts for final review, we anticipate being able to issue
unmodified audit opinions in the independent auditor's report on 24 September 2024 (the
proposed report is attached at Appendix A).
Annual Audit Report
2.  Under International Standards on Auditing in the UK, we report specific matters arising from
the audit of the annual accounts to those charged with governance of a body in sufficient time to
enable appropriate action. For South Lanarkshire Council, those charged with governance is the
Risk and Audit Scrutiny Committee. We present for the committee’s consideration our draft
Annual Audit Report on the 2023/24 audit. The section headed "Significant findings and key
audit matters" sets out the issues identified in respect of the annual accounts.
3.  The report also sets out conclusions on the wider scope areas that frame public audit as set
out in the Code of Audit Practice.
4.  This report will be issued in final form after the audit of the annual accounts has been
completed.
Unadjusted misstatements
5.  We also report to those charged with governance all unadjusted misstatements in the annual
accounts which we have identified during the course of our audit, other than those of a trivial
nature, and request that these misstatements be corrected.
6.  We have no unadjusted misstatements to be corrected.
Fraud, subsequent events, and compliance with laws and regulations
7.  In presenting this report to the Risk and Audit Scrutiny Committee we seek confirmation from
those charged with governance of any instances of any actual, suspected, or alleged fraud; any
subsequent events that have occurred since the date of the financial statements; or material
non-compliance with laws and regulations affecting the entity that should be brought to our
attention.
3
11

Page 12

Representations from Section 95 Officer
8.  As part of the completion of our audit, we are seeking written representations from the
Executive Director (Finance and Corporate Resources) as Section 95 Officer on aspects of the
annual accounts, including the judgements and estimates made.
9.  A draft letter of representation is attached at Appendix B. This should be signed and returned
to is by the Section 95 Officer with the signed annual accounts prior to the independent auditor’s
report being certified. 
Outstanding matters
10.   At the time of issuing our proposed Annual Audit Report certain audit evidence remained
outstanding. 
12

Page 13

Appendix A:  Proposed Independent Auditor’s Report
Independent auditor’s report to the members of South Lanarkshire
Council and the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of South Lanarkshire
Council and its group for the year ended 31 March 2024 under Part VII of the Local Government
(Scotland) Act 1973. The financial statements comprise the group and Council only
Comprehensive Income and Expenditure Statement, the group and Council only Balance
Sheets, the group and Council only Movement in Reserves Statements, the group and Council
only Cash-Flow Statements, the Housing Revenue Account Income and Expenditure
Statement, the National Non-Domestic Rates Income and Expenditure Statement, the Council
Tax Income and Expenditure Statement and notes to the financial statements, including
Accounting Policies. The financial reporting framework that has been applied in their
preparation is applicable law and UK adopted international accounting standards, as interpreted
and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom
2023/24 (the 2023/24 Code).
In my opinion the accompanying financial statements:
• give a true and fair view of the state of affairs of the council and its
group as at 31 March 2024 and of the income and expenditure of the
council and its group for the year then ended;
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2023/24 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, The Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland
Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards on Auditing
(UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the Accounts
Commission for Scotland. My responsibilities under those standards are further described in the
auditor’s responsibilities for the audit of the financial statements section of my report. I was
appointed by the Accounts Commission on 2 December 2022. My period of appointment is five
years, covering 2022/23 to 2026/27. I am independent of the council and its group in
accordance with the ethical requirements that are relevant to my audit of the financial
statements in the UK including the Financial Reporting Council’s Ethical Standard, and I have
fulfilled my other ethical responsibilities in accordance with these requirements. Non-audit
services prohibited by the Ethical Standard were not provided to the council. I believe that the
audit evidence I have obtained is sufficient and appropriate to provide a basis for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the preparation of the
financial statements is appropriate.
13

Page 14

Based on the work I have performed, I have not identified any material uncertainties relating to
events or conditions that, individually or collectively, may cast significant doubt on the ability of
the council and its group to continue to adopt the going concern basis of accounting for a period
of at least twelve months from when the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the current or future
financial sustainability of the council and its group. However, I report on the council’s
arrangements for financial sustainability in a separate Annual Audit Report available from the
Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of material misstatement
that I identified and my judgements thereon.
Responsibilities of Executive Director (Finance and Corporate Resources) and Risk and
Audit Scrutiny Committee for the financial statements
As explained more fully in the Statement of Responsibilities, the Executive Director (Finance
and Corporate Resources) is responsible for the preparation of financial statements that give a
true and fair view in accordance with the financial reporting framework, and for such internal
control as the Executive Director (Finance and Corporate Resources) determines is necessary
to enable the preparation of financial statements that are free from material misstatement,
whether due to fraud or error.
In preparing the financial statements, the Executive Director (Finance and Corporate
Resources) is responsible for assessing the ability of the council and its group to continue as a
going concern, disclosing, as applicable, matters related to going concern and using the going
concern basis of accounting unless there is an intention to discontinue the operations of the
council and its group.
The Risk and Audit Scrutiny Committee is responsible for overseeing the financial reporting
process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial statements as a
whole are free from material misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes my opinion. Reasonable assurance is a high level of assurance,
but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always detect a
material misstatement when it exists. Misstatements can arise from fraud or error and are
considered material if, individually or in the aggregate, they could reasonably be expected to
influence the decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I
design procedures in line with my responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• using my understanding of the local government sector to identify that
the Local Government (Scotland) Act 1973, The Local Authority
Accounts (Scotland) Regulations 2014, and the Local Government in
Scotland Act 2003 are significant in the context of the council and its
group;
14

Page 15

• inquiring of the Executive Director (Finance and Corporate Resources)
as to other laws or regulations that may be expected to have a
fundamental effect on the operations of the council and its group;
• inquiring of the Executive Director (Finance and Corporate Resources)
concerning the policies and procedures of the councils and its group
regarding compliance with the applicable legal and regulatory
framework;
• discussions among my audit team on the susceptibility of the financial
statements to material misstatement, including how fraud might occur;
and
• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance
with laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the council’s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that
result from error as fraud may involve collusion, intentional omissions, misrepresentations, or
the override of internal control. The capability of the audit to detect fraud and other irregularities
depends on factors such as the skilfulness of the perpetrator, the frequency and extent of
manipulation, the degree of collusion involved, the relative size of individual amounts
manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is
located on the Financial Reporting Council's website www.frc.org.uk/auditorsresponsibilities.
This description forms part of my auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited parts of the
Remuneration Report
I have audited the parts of the Remuneration Report described as audited. In my opinion, the
audited parts of the Remuneration Report have been properly prepared in accordance with The
Local Authority Accounts (Scotland) Regulations 2014.
Other information 
The Executive Director (Finance and Corporate Resources) is responsible for the other
information in the annual accounts. The other information comprises the Management
Commentary, Annual Governance Statement, Statement of Responsibilities and the unaudited
parts of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider whether the other
information is materially inconsistent with the financial statements or my knowledge obtained in
the course of the audit or otherwise appears to be materially misstated. If I identify such material
inconsistencies or apparent material misstatements, I am required to determine whether this
gives rise to a material misstatement in the financial statements themselves. If, based on the
work I have performed, I conclude that there is a material misstatement of this other information,
I am required to report that fact. I have nothing to report in this regard.
15

Page 16

My opinion on the financial statements does not cover the other information and I do not
express any form of assurance conclusion thereon except on the Management Commentary
and Annual Governance Statement to the extent explicitly stated in the following opinions
prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management Commentary and
Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with
the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited parts of the Remuneration
Report are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my
audit.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the wider scope
responsibilities specified in the Code of Audit Practice, including those in respect of Best Value,
are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of
the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 108 of the Code of Audit Practice, I do not undertake to have responsibilities to
members or officers, in their individual capacities, or to third parties. 
John Boyd FCPFA
Audit Scotland
4th Floor
South Suite
16

Page 17

The Athenaeum Building
8 Nelson Mandela Place
Glasgow
G2 1BT  
17

Page 18

Appendix B:  Letter of Representation (ISA 580)
Mr John Boyd, Audit Director
Audit Scotland
4th Floor
8 Nelson Mandela Place
Glasgow 
G2 1BT
Dear John
South Lanarkshire Council
Annual Accounts 2023/24
1.  This representation letter is provided about your audit of the annual accounts of South
Lanarkshire Council and its group (hereafter referred to as the Council ) for the year ended 31
March 2024 for the purpose of expressing an opinion as to whether the financial statements
give a true and fair view and have been properly prepared, and for expressing other opinions on
the Remuneration Report, Management Commentary, and Annual Governance Statement.
2.  I confirm to the best of my knowledge and belief and having made appropriate enquiries of
the Chief Executive and Corporate Management Team, the following representations given to
you in connection with your audit of South Lanarkshire Council’s annual accounts for the year
ended 31 March 2024.
General
3.  The Council and I have fulfilled our statutory responsibilities for the preparation of the
2023/24 annual accounts. All the accounting records, documentation, and other matters which I
am aware are relevant to the preparation of the annual accounts have been made available to
you for the purposes of your audit. All transactions undertaken by the Council have been
recorded in the accounting records and are properly reflected in the financial statements.
4.  I confirm that the effects of uncorrected misstatements are immaterial, individually and in
aggregate, to the financial statements as a whole. I am not aware of any uncorrected
misstatements other than those reported by you.
Financial Reporting Framework
5.  The annual accounts have been prepared in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2023/24 (2023/24 accounting code), and the
requirements of the Local Government (Scotland) Act 1973, the Local Government in Scotland
Act 2003, and The Local Authority Accounts (Scotland) Regulations 2014.
6.  In accordance with the 2014 Regulations, I have ensured that the financial statements give a
true and fair view of the financial position of the Council and its Group at 31 March 2024 and the
transactions for 2023/24. 
Accounting Policies and Estimates
7.  All material accounting policies applied are as shown in the notes to the financial statements.
The accounting policies are determined by the 2023/24 accounting code where applicable.
Where the accounting code does not specifically apply, I have used judgement in developing
and applying an accounting policy that results in information that is relevant and reliable. All
18

Page 19

accounting policies applied are appropriate to the Council’s circumstances and have been
consistently applied.
8.  The significant assumptions used in making accounting estimates are reasonable and
properly reflected in the financial statements. Judgements used in making estimates have been
based on the latest available, reliable information. Estimates have been revised where there are
changes in the circumstances on which the original estimate was based or as a result of new
information or experience.
Going Concern Basis of Accounting
9.  I have assessed the Council’s ability to continue to use the going concern basis of accounting
and have concluded that it is appropriate. I am not aware of any material uncertainties that may
cast significant doubt on the Council’s ability to continue to adopt the going concern basis of
accounting. 
Assets
10.  Where a rolling programme of asset valuations has been used, I have satisfied myself that
the carrying amount of assets at 31 March 2024 does not differ materially from that which would
be determined if a revaluation had been carried out at that date.
11.  I carried out an assessment at 31 March 2024 as to whether there is any indication that an
asset may be impaired and have recognised any impairment losses identified.
12.  I have provided you with all information of which I am aware regarding any valuation
exercises carried out after 31 March 2024. 
13.  There are no plans or intentions that are likely to affect the carrying value or classification of
the assets recognised within the financial statements.
14.  Owned assets are free from any lien, encumbrance or charge except as disclosed in the
financial statements.
15.  The pension assumptions made by the actuary in the IAS 19 report for South Lanarkshire
Council have been reviewed and I confirm that they are consistent with management's own
view. The pension asset has been capped to reflect the asset ceiling as determined through
IFRIC 14. I am satisfied that the assumptions applied in the calculation are consistent with
management’s own view.
Liabilities
16.  All liabilities at 31 March 2024 of which I am aware have been reported in the financial
statements.
17.  Provisions have been recognised in the financial statements for all liabilities of uncertain
timing or amount at 31 March 2024 of which I am aware where the conditions specified in the
2023/24 accounting code have been met. The amount recognised as a provision is the best
estimate of the expenditure likely to be required to settle the obligation at 31 March 2024.
Where the effect of the time value of money is material, the amount of the provision has been
discounted to the present value of the expected payments.  
18.  Provisions recognised in previous years have been reviewed and adjusted, where
appropriate, to reflect the best estimate at 31 March 2024 or to reflect material changes in the
assumptions underlying the calculations of the cash flows.
19

Page 20

19.  The accrual recognised in the financial statements for annual leave untaken by 31 March
2024 has been estimated on a reasonable basis. 
20.  There are no plans or intentions that are likely to affect the carrying value or classification of
the liabilities recognised in the financial statements.
Contingent Liabilities
21.  There are no significant contingent liabilities, other than those disclosed in Note 31 to the
financial statements, arising either under formal agreement or through formal undertakings
requiring disclosure in the accounts. All known contingent liabilities have been fully and properly
disclosed in accordance with the 2023/24 accounting code and IAS 37.
Litigation and Claims
22.  All known actual or possible legal claims have been disclosed to you and have been
accounted for and disclosed in the financial statements in accordance with the 2023/24
accounting code. 
Fraud
23.  I understand my responsibilities for the design, implementation, and maintenance of internal
control to prevent fraud and I believe I have appropriately fulfilled those responsibilities. 
24.  I have provided you with all information in relation to:
• my assessment of the risk that the financial statements may be materially misstated
because of fraud 
• any allegations of fraud or suspected fraud affecting the financial statements, and
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements. 
Laws and Regulations
25.  I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements.
Related Party Transactions
26.  All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with the 2023/24 accounting code. I have
made available to you the identity of all the Council’s related parties and all the related party
relationships and transactions of which I am aware.
Remuneration Report
27.  The Remuneration Report has been prepared in accordance with the Local Authority
Accounts (Scotland) Regulations 2014, and all required information of which I am aware has
been provided to you.
20

Page 21

Management Commentary
28.  I confirm that the Management Commentary has been prepared in accordance with the
statutory guidance and the information is consistent with the financial statements. 
Corporate Governance
29.  I confirm that the Council has undertaken a review of the system of internal control during
2023/24 to establish the extent to which it complies with proper practices set out in the
Delivering Good Governance in Local Government: Framework 2016. I have disclosed to you all
deficiencies in internal control identified from this review or of which I am otherwise aware.
30.  I confirm that the Annual Governance Statement has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework 2016 and the information is
consistent with the financial statements. There have been no changes in the corporate
governance arrangements or issues identified, since 31 March 2024, which require to be
reflected. 
Group Accounts
31.  I have identified all the other entities in which the Council has a material interest and have
classified and accounted for them in accordance with the 2023/24 accounting code. Any
significant issues with the financial statements of group entities, including any qualified audit
opinions, have been advised to you.
Common Good Fund
32.  I confirm, to the best of my ability, that all material common good assets have been
identified and correctly accounted for within the common good fund financial statements and
where appropriate, common good assets in use by the Council have been assessed and
accounted for in line with IAS 17.  
Events Subsequent to the Date of the Balance Sheet
33.  All events subsequent to 31 March 2024 for which the 2023/24 accounting code requires
adjustment or disclosure have been adjusted or disclosed. 
Yours sincerely 
Executive Director (Finance and Corporate Resources)
Section 95 Officer
21

Page 22

22

Page 23

Prepared for the Members of South Lanarkshire Council and the Controller of Audit
September 2024
South Lanarkshire Council
2023/24 Annual Audit Report – PROPOSED 
3
23

Page 24

South Lanarkshire Council 2023/24 Annual Audit Report – PROPOSED | 2
Contents 
Key messages 3
Introduction 5
1. Audit of 2023/24 annual accounts 7
2. Financial management 15
3. Financial sustainability 21
4. Best Value 25
5. Vision, leadership and governance 27
6. Use of resources to improve outcomes 29
Appendix 1. Action plan 2023/24 35
Appendix 2. Summary of uncorrected misstatements 43
24

Page 25

Key messages | 3 
Key messages 
2023/24 annual accounts 
1 Our audit opinions on the annual accounts of South Lanarkshire Council (the
Council), its group and the section 106 charities administered by the Council
are unmodified, i.e. the financial statements and related reports are free from
material misstatement.
2 The management commentary, annual governance statement and
remuneration report were all consistent with the financial statements and
properly prepared in accordance with the relevant regulations and guidance.
3 No adjustments have been made to the annual accounts as a result of the
audit process (subject to completion of the audit). 
Financial management and sustainability
4 The Council continues to operate within its annual budget. While facing
financial challenges through inflationary pressures on pay and non-pay costs
as well as demand on services, the Council continues to demonstrate sound
financial management maintaining general fund reserves in line with the long
term Revenue Financial Strategy.
5 The Council transformational change programme is underway to help the
Council achieve a balanced budget, and support medium and long term
financial plans.
6 The Council has effective budget monitoring arrangements. Given the
financial pressures, the Council is continuing to assess its reserves strategy
and review how it assesses, monitors and reports on its financial resilience.
Best Value 
7 The Council’s Workforce Plan 2022-25 is supported by detailed service level
plans, however there is an opportunity for this to have a more strategic focus.
8 The Council is using digital technology to support new ways of working but
has not yet set out how it plans to use digital technology to shape its future
workforce.
9 Our follow up work of Best Value improvement recommendations from
2022/23 concluded that the Council has now addressed these
recommendations. 
25

Page 26

Key messages | 4 
Vision, leadership and governance
10 The Council has a clear vision, strategy, and priorities.
11 The Council has effective and appropriate governance arrangements for
delivery of its plans.
12 A new Chief Executive and Director of Finance and Corporate Resources
were appointed during 2023/24.
13 The Council has a Management Development programme in place to support
succession planning.
Use of resources to improve outcomes
14 The Council has an effective performance management framework in place.
15 The Council’s overall performance has improved compared to its prior year
results but has declined compared with the Scottish average.
16 The Council has effective and appropriate arrangements in place to ensure
that resources are deployed to improve strategic outcomes, that meet the
needs of service users.
26

Page 27

Introduction | 5 
Introduction 
1.  This report summarises the findings from the 2023/24 annual audit of South
Lanarkshire Council. The scope of the audit was set out in an Annual Audit Plan
presented to the 26 March 2024 meeting of the Risk and Audit Scrutiny
Committee. This Annual Audit Report comprises:
• significant matters arising from an audit of South Lanarkshire Council’s
annual accounts 
• conclusions on South Lanarkshire Council’s performance in meeting its
Best Value duties
• conclusions on the following wider scope areas that frame public audit as
set out in the Code of Audit Practice 2021:
o Financial Management 
o Financial Sustainability 
o Vision, Leadership, and Governance
o Use of Resources to Improve Outcomes.
2.  This report is addressed to South Lanarkshire Council and the Controller of
Audit and will be published on Audit Scotland's website www.audit-
scotland.gov.uk in due course.
Audit appointment 
3.  John Boyd has been appointed by the Accounts Commission as auditor of
South Lanarkshire Council for the period from 2022/23 until 2026/27. The
2023/24 financial year was the second year of the five-year appointment.
4.  We would like to thank councillors, risk and audit scrutiny committee
members, senior management, and other staff, particularly those in finance, for
their cooperation and assistance in this year’s audit and we look forward to
working together constructively over the remainder of the five-year appointment.
Responsibilities and reporting 
5.  South Lanarkshire Council has primary responsibility for ensuring the proper
financial stewardship of public funds. This includes preparing annual accounts
that are in accordance with proper accounting practices. South Lanarkshire
Council is also responsible for compliance with legislation, and putting
arrangements in place for governance and propriety that enable it to
successfully deliver its objectives.
27

Page 28

Introduction | 6 
6.  The responsibilities of the independent auditor are established by the Local
Government (Scotland) Act 1973, the Code of Audit Practice 2021 and
supplementary guidance, and International Standards on Auditing in the UK. 
7.  Weaknesses or risks identified are only those which have come to our
attention during our normal audit work and may not be all that exist.
Communicating these does not absolve management of South Lanarkshire
Council from its responsibility to address the issues raised and to maintain
adequate systems of control.
8.  This report contains an agreed action plan at Appendix 1. It sets out specific
recommendations, the responsible officers, and dates for implementation. 
Auditor Independence 
9.  We can confirm that we comply with the Financial Reporting Council’s Ethical
Standard. We can also confirm that we have not undertaken any non-audit
related services and therefore the 2023/24 audit fee of £625,070 (including
£3,500 in respect of Charitable Trusts) as set out in our 2023/24 Annual Audit
Plan remains unchanged. We are not aware of any relationships that could
compromise our objectivity and independence.
10.  The annual audit adds value to South Lanarkshire Council by:
• identifying and providing insight on significant risks, and making clear and
relevant recommendations 
• providing clear and focused conclusions on the appropriateness,
effectiveness and impact of corporate governance, arrangements to
ensure the best use of resources and financial sustainability.
• sharing intelligence and good practice identified.
28

Page 29

1. Audit of 2023/24 annual accounts | 7 
1. Audit of 2023/24 annual
accounts
Public bodies are required to prepare annual accounts comprising
financial statements and other related reports. These are principal
means of accounting for the stewardship public funds. 
Main judgements
Our audit opinions on the annual accounts of South Lanarkshire Council, its group
and the section 106 charities administered by the Council are unmodified, i.e. the
financial statements and related reports are free from material misstatement. 
The management commentary, annual governance statement and remuneration
report were all consistent with the financial statements and properly prepared in
accordance with the relevant regulations and guidance.
Audit opinions on the annual accounts are unmodified
11.  The Council approved the annual accounts for South Lanarkshire Council
and its group for the year ended 31 March 2024 on 24 September 2024. In
addition to the Council the group accounts consolidate the financial results of
the Council and its subsidiaries and its investments in associates and interests
in joint ventures. These include: Strathclyde Partnership for Transport,
Strathclyde Concessionary Travel Scheme Joint Committee, Lanarkshire
Valuation Joint Board, South Lanarkshire Integration Joint Board, South
Lanarkshire Leisure and Culture Limited, Routes to Work South, Clyde Valley
Learning and Development Joint Committee and the Common Good Fund.
12.  As reported in the independent auditor’s report, in my opinion as the
appointed auditor:
• the financial statements give a true and fair view and were properly
prepared in accordance with the financial reporting framework
• the audited part of the remuneration report was prepared in accordance
with The Local Authority Accounts (Scotland) Regulations 2014.
• the management commentary and annual governance statement were
consistent with the financial statements and properly prepared in
accordance with the applicable requirements.
29

Page 30

1. Audit of 2023/24 annual accounts | 8 
Overall materiality was assessed on receipt of the unaudited
annual accounts as £26.5 million
13.  Broadly, the concept of materiality is applied by auditors to determine
whether misstatements identified during the audit could reasonably be expected
to influence the economic decisions of users of the financial statements, and
hence impact their opinion set out in the independent auditor’s report. Auditors
set a monetary threshold when considering materiality, although some issues
may be considered material by their nature. It is ultimately a matter of the
auditor’s professional judgement.
14.  Our initial assessment of materiality was carried out during the risk
assessment phase of the audit. This was reviewed on receipt of the unaudited
annual accounts and is summarised in Exhibit 1.
Exhibit 1
Materiality values
Materiality level Council Group
Overall materiality £26.5 million £26.8 million
Performance materiality  £18.6 million £18.8 million
Reporting threshold  £1.33 million £1.34 million
Source: Audit Scotland 
15.  The overall materiality threshold for the audit of the annual accounts of
South Lanarkshire Council and its group was set with reference to gross
expenditure, which was judged as the figure most relevant to the users of the
financial statements.
16.  Performance materiality is used by auditors when undertaking work on
individual areas of the financial statements. It is a lower materiality threshold,
set to reduce the probability of aggregated misstatements exceeding overall
materiality. We have used our professional judgement and set performance
materiality at 70 per cent of overall materiality.
17.  It is our responsibility to request that all misstatements, other than those
below our reporting threshold, are corrected, although the final decision on
making the correction lies with those charged with governance.
Significant findings and key audit matters
18.  Under ISA (UK) 260, we communicate significant findings from the audit to
the council, including our view about the qualitative aspects of the council’s
accounting practices.
19.  The Code of Audit Practice also requires us to highlight key audit matters,
which are defined in ISA (UK) 701 as those matters judged to be of most
30

Page 31

1. Audit of 2023/24 annual accounts | 9 
significance. The significant findings including key audit matters, are
summarised in Exhibit 2.
Exhibit 2
Significant findings and key audit matters from the audit of the annual accounts
Issue Resolution 
1. Non-current assets
Council house valuations: Council dwellings
require to be valued on an Existing Use Value –
Social Housing (EUV-SH) basis. 
The Beacon Method is the methodology which
estimates this. The Beacon principle is used for
large groups of properties that contain a similar
design, age, type, or construction. 
A sample property (the beacon) is selected, which
is representative of the group, and a detailed
inspection and valuation carried out. For the
purposes of this exercise 'representative of the
group' means the most typical or frequently
occurring type of dwelling within the group.
The Beacon valuation is compared with the other
properties within the group. The aim is to
accurately reflect the range of values within the
group.
The approach taken by the Council draws on
elements of Guidance for Valuers issued in 2016,
however the Council should ensure that the
methodology applied is consistent to factor in
different types and ages of property.
The Council provided a detailed
summary paper to management
outlining the approach undertaken and
assurances that the approach taken
does not result in a material
misstatement of the overall council
house stock value.
Recommendation 1
(Refer Appendix 1, action plan) 
The valuer should review the current
valuation process against applicable
guidance to assure themselves that the
valuation process remains fit for
purpose.
Source: Audit Scotland
Our audit work responded to the risks of material misstatement
we identified in the annual accounts
20.  We have obtained audit assurances over the identified significant risks of
material misstatement in the annual accounts. Exhibit 3 sets out the significant
risks of material misstatement to the financial statements identified in our
2023/24 Annual Audit Plan. It also summarises the further audit procedures
performed during the year to obtain assurances over these risks and the
conclusions from the work completed. 
31

Page 32

1. Audit of 2023/24 annual accounts | 10 
Exhibit 3
Significant risks of material misstatement in the annual accounts
Audit risk Assurance procedure Results and conclusions
1. Risk of material
misstatement due to fraud
caused by management
override of controls 
As stated in ISA (UK) 240,
management is in a unique
position to perpetrate fraud
because of management’s
ability to override controls
that otherwise appear to be
operating effectively.
• Assess the design and
implementation of controls over
journal entry processing.
• Make inquiries of individuals
involved in the financial reporting
process about inappropriate or
unusual activity relating to the
processing of journal entries and
other adjustments.
• Test journals at the year-end
and post-closing entries and
focus on significant risk areas. 
• Consider the need to test
journal entries and other
adjustments throughout the year.
• Evaluate significant
transactions outside the normal
course of business.
• Assess the adequacy of
controls in place for identifying
and disclosing related party
relationship and transactions in
the financial statements. 
• We will assess any changes to
the methods and underlying
assumptions used to prepare
accounting estimates compared
to the prior year.
Results: We found no
instances of material
misstatement due to fraud
or error caused by
management override of
controls.
Assurance has been
gained that in year and
year end journals were
properly processed.
2. Estimation in the
valuation of land and
buildings.
South Lanarkshire Council
held land and buildings with
a net book value of £3,324
million at 31 March 2023. 
There can be a significant
degree of subjectivity in the
valuation of land and
buildings. Valuations are
based on specialist and
management assumptions,
and changes in these can
• Review the information
provided to the external valuer to
assess for completeness.
• Evaluate the competence,
capabilities, and objectivity of the
professional valuer.
• Obtain an understanding of the
management’s involvement in the
valuation process to assess if
appropriate oversight has
occurred.
• Critically assess the approach
South Lanarkshire Council has
adopted to assess the risk that
assets not subject to valuation
Results: Assurance has
been gained that there are
no material misstatements
in the carrying value of
land & buildings. 
32

Page 33

1. Audit of 2023/24 annual accounts | 11 
Audit risk Assurance procedure Results and conclusions
result in material changes to
valuations. 
Valuations should reflect
conditions at 31 March 2024
including those subject to
valuation, those valued
earlier in the year and those
not re-valued. 
There is a risk that the
carrying value of land and
buildings does not reflect
the current value as at 31
March 2024.
are materially misstated and
consider the robustness of that
approach.
• Review the appropriateness of
the key assumptions used in the
valuation of land and buildings as
well as the underlying data used
to support the estimate.
• Critically assess the adequacy
of South Lanarkshire Council’s
disclosures regarding the
assumptions in relation to the
valuation of land and buildings.
Source: Audit Scotland
21.  In addition, as part of our assessment of audit risks, we identified other
areas where we considered there were also risks of material misstatement to
the financial statements. Based on our assessment of the likelihood and
magnitude of the risks, we did not consider these to represent significant risks.
These areas of specific audit focus were: 
22.  Pension Valuation: the pension valuation due to the material value and
significant assumptions used in the calculation of the carrying value. We utilised
the work of PwC as auditor expert in assessing the reasonableness of the
methodology used and assumptions made by the Council’s actuary, Hymans
Robertson LLP, in arriving at the IAS 19 pension valuation as at 31 March 2024.
23.  In accordance with IFRIC 14, the pension asset recognised within the
financial statements was capped at the estimated future benefit to the Council.
We have reviewed the assumptions applied by the actuary in arriving at the
asset ceiling cap and are satisfied that this is in accordance with IFRIC 14. The
net pension asset recognised was £NIL.
24.  As part of our risk assessment, we have also identified the following areas
where further work would be performed. These are not risk of material
misstatement to the primary financial statements but areas to be kept under
review:
25.  IFRS 16: from 1 April 2024, a new International Financial Reporting
Standard, IFRS 16, will come into effect for Local Authorities. IFRS 16
introduces a new ‘Right of Use’ asset class to the balance sheet, and also
recognises the corresponding lease liability. This applies to all leases - property,
land, vehicles, plant and equipment.
26.  This will change the way in which South Lanarkshire Council accounts for
operating leases, including recognising assets and liabilities for the rights and
obligations arising from leases previously classified as operating leases. The
33

Page 34

1. Audit of 2023/24 annual accounts | 12 
Council has prepared a summary paper outlining their preparations for the
implementation of IFRS 16 from 2024/25.
27.  In terms of recognition exemptions, IFRS 16 provides two major recognition
and measurement exemptions to reduce the reporting burden on entities; short-
term leases and low value leases. CIPFA has mandated the application of the
recognition exemption for short term leases meaning that a lease that, at the
commencement date, has a lease term of 12 months or less is exempt from the
accounting treatment under IFRS 16.
28.  For low value leases the recognition exemption is optional. The Council as
lessee may elect not to apply the accounting treatment under IFRS 16 to low
value leases. It is a matter for individual authorities to set a local policy to define
what low value is in practice. The Council has elected to apply the low value
recognition.
29.  Under IFRS 16 the initial measurement of the lease liability is recognised at
the commencement date and measured as the present value of the lease
payments that are not paid at that date using the:
• interest rate implicit in the lease, or
• lessee’s incremental borrowing rate (but only if the implicit rate cannot be
readily determined)
30.  The Council will use the PWLB annuity certainty rate that matches the term
of the lease as a measure of its incremental borrowing rate in the event that the
interest rate implicit in the lease cannot be readily determined.
31.  IFRS 16 is a complex accounting standard and the Council has recognised
that officers do not necessarily have the required skills and knowledge to
undertake the implementation of IFRS 16 alone. The Council has awarded Link
Treasury Services the contract for the procurement of leasing advice. The
Council is also investigating the procurement of a software solution that meets
the particular accounting requirements of IFRS 16 for local authorities.
32.  Officers from Finance Services have been working alongside colleagues in
other service departments to identify any leases that the Council may have in
place. This exercise captured information at a specific point in time and will be
reviewed and repeated throughout the current financial year. However the
Council is not yet in a position to quantify the likely impact of IFRS 16.
Recommendation 2
The Council is progressing its review to support the implementation of IFRS 16 for
the 2024/25 financial statements. The Council is not yet in a position to quantify
the likely impact of IFRS 16. The Council should review the current timetable to
ensure that key dates are being achieved to allow implementation in line with the
project plan.
34

Page 35

1. Audit of 2023/24 annual accounts | 13 
33.  The statutory override relating to valuation of infrastructure assets is due
to end for the 2024/25 financial statements. On 24 June 2024, the Scottish
Government published; Introduction - Local government finance circular 8/2024
- accounting for infrastructure assets: temporary statutory override - gov.scot
(www.gov.scot). 
34.  Due to practical difficulties in applying component accounting for the
recognition and derecognition of replaced components of infrastructure assets,
most local authorities have been unable to comply with the requirement to
assess the net book value of a replaced component of an infrastructure asset
and have taken a network approach to the measurement of such assets,
treating the amount of the replaced component as having no value.
35.  A temporary statutory override was introduced in August 2022, applying to
the 2022/23 and 2023/24 financial years, in order to allow time for the CIPFA
LASAAC Local Authority Accounting Code Board to conclude the development
of a permanent solution. 
36.  However, a permanent solution has not yet been agreed and CIPFA believe
that this will continue be an area of enhanced scrutiny for local government
auditors. The statutory guidance will therefore be extended by a further 12
months, until 31 March 2025.
Recommendation 3
The Council should proactively work with CIPFA and the wider local government
sector to arrive at appropriate solution for the implementation of accounting for
infrastructure assets.
37.  We kept these areas under review throughout our audit. Based on the
findings of the audit procedures performed, there are no matters which we need
to bring to your attention. 
There were no identified misstatements 
38.  To be confirmed on conclusion on the audit.
39.  The unaudited accounts were updated by management during the course of
the audit to reflect an accounting adjustment. This resulted in a decrease in the
deficit in the Comprehensive Income and Expenditure Statement of £86,622
and a corresponding increase the Usable Reserves balance on the Balance
Sheet of £86,622. We are content the Council has correctly actioned the
required adjustment.
The unaudited annual accounts were received in line with the
agreed audit timetable 
40.  The unaudited annual accounts were received in line with the agreed audit
timetable on 25 June 2024. 
35

Page 36

1. Audit of 2023/24 annual accounts | 14 
Our audit opinions on Section 106 charities were unmodified 
41.  Due to the interaction of section 106 of the Local Government in Scotland
Act 1973 with the charities legislation, a separate independent auditor's report is
required for the statement of accounts of each registered charity where
members of the Council are sole trustees, irrespective of the size of the charity. 
42.  The Council has made good progress in reducing or removing the number
of charitable trusts where it is the sole trustee.
43.  Our audit opinions on the Section 106 charities are unmodified. 
Good progress was made on prior year recommendations 
44.  South Lanarkshire Council has made good progress in implementing the
agreed prior year audit recommendations. For actions not yet implemented,
revised responses and timescales have been agreed with management, and
are set out in Appendix 1. 
36

Page 37

2. Financial management | 15 
2. Financial management
Financial management means having sound budgetary processes, and
the ability to understand the financial environment and whether internal
controls are operating effectively.
Conclusion
The Council continues to operate within its annual budget. While facing financial
challenges through inflationary pressures on pay and non-pay costs as well as
demand on services, the Council continues to demonstrate sound financial
management maintaining general fund reserves in line with the long term
Revenue Financial Strategy.
The Council operated within budget in 2023/24
45.  The Council approved its 2023/24 revenue budget of £895.702 million in
February 2023. In its 2023/24 annual accounts, the Council reported an
underspend on the provision of services of £26.351 million. This was mainly as
a result of underspends in the corporate items budget which included
unbudgeted income from a historic VAT claim, an underspend on loan charges
reflecting the timing and level of borrowing and the resultant reduced interest
charges, and an over-recovery of council tax. Following a number of agreed
transfers to contribute to reserves, the final reported position was break-even. 
46.  The changes in the budget position were reported in revenue budget
monitoring reports presented to the Executive Committee throughout the year.
These reports contained a good level of detail on the forecast outturn position.
There were no significant under or overspends during 2023/24 at a service
level.
An underspend of £0.360 million was reported against the
Housing Revenue Account (HRA) budget
47.  The Council is required by legislation to maintain a separate housing
revenue account and to ensure that rents are set a level which will at least
cover the costs of its social housing provision. 
48.  The Council reported a £0.360 million underspend against the HRA budget
for 2023/24 mainly as a result of a reduction in loan charges due to the Loans
Fund review and additional rental income from new builds and purchased
Council housing being greater than anticipated. These were offset by additional
spend on repairs and maintenance. The underspend was transferred to the
Housing Revenue Account Reserve resulting in a closing balance of £13.221
million in 2023/24.
37

Page 38

2. Financial management | 16 
The Council has appropriate and effective budget setting and
monitoring arrangement in place
49.  The Council continues to balance its budget each year and maintains the
level of reserves is in line with the long term Revenue Financial Strategy.
50.  From our review of these reports, we concluded that these provide an
overall picture of the budget position at service level and good explanations for
significant variances against budget. These allow both members and officers to
carry out scrutiny of the Council’s finances.
51.  The Council has appropriate and effective budget setting and monitoring
arrangements in place. Council members worked collaboratively to set the
Council budget for 2024/25.
The level of General Fund reserves has decreased with the
majority of these earmarked for specific Council priorities
52.  One of the key measures of the financial health of a body is the level of
reserves held. The General Fund is the largest usable reserve and is used to
fund the delivery of services. It provides a contingency fund to meet unexpected
expenditure and a working balance to help cushion the impact of such
expenditure. 
53.  The level of usable reserves decreased from £176.941 million in 2022/23 to
£133.689 million in 2023/24 exhibit 4. The General Fund balance is £109.773
million, however £96.730 million has been earmarked for a specific priority
which leaves a residual £13.043 million of uncommitted general reserves.
Against an expenditure budget of £895.702 million for 2023/2024, this
unearmarked element represents a 1.45 per cent reserve. Management
considers that this level of reserve reflects a suitable contingency to contribute
towards any unanticipated pressures.
Exhibit 4
South Lanarkshire Council usable reserves 
Reserve 31 March
2020
£’million
31 March
2021
£’million
31 March
2022
£’million
31 March
2023
£’million
31 March
2024
£’million
General fund  75.579 116.980 122.424 150.283 109.773
Housing
revenue
account
9.713 12.784 16.241 12.861 13.221
Repair and
renewal fund
5.918 7.484 6.496 7.610 5.346
Capital fund 10.327 6.268 5.730 4.776 3.975
38

Page 39

2. Financial management | 17 
Insurance fund  2.053 2.304 1.295 1.411 0.195
Total usable
reserves 
103.590 145.820 £152.186 176.941 133.689
Source: South Lanarkshire Council annual accounts 2019/20 to 2023/24
54.  We are satisfied that reserves are being regularly reviewed to confirm that
they remain at an appropriate level. However, there are ongoing sustainability
challenges of using reserves to fund recurring expenditure. Difficult decisions
will need to be taken in the future, with a clear plan and effective management
of the Council’s reserves key to maintaining financial sustainability. 
Capital expenditure was less than originally budgeted in
2023/24
55.  The Council approved the 2023/24 capital programmes in February 2023.
The general services programme for 2023/2024 originally totalled £91.061
million, with the housing capital programme amounting to £63.916 million. 
56.  At the Executive Committee meeting in June 2023, revisions were made to
the general services programme including, slippage of £12.660 million from
2022/23 projects added to the programme budget and £26.775 million of
2023/24 projects removed to give an updated budget of £77.849 million for
2023/24.
57.  At each meeting of the Executive Committee, capital programme monitoring
reports are presented to members. Throughout the year these reports detailed
the various movements in the general services programme budget.
58.  At the June 2024 Executive Committee, the general services outturn capital
programme spend was reported as £64.244 million for 2023/24, against original
budget representing a slippage of 29.5 per cent.
59.  The underspend reflects a variation from the expected timing of spend
across a number of projects within multi-year programmes. The main projects
contributing to the underspend include the Place Based Investment
Programme, Rural Development Centre, IT infrastructure Refresh and a number
of Glasgow City Region City Deal projects.
60.  The housing capital programme outturn was reported as £62.240 million for
2023/24, against the revised budget of £63.916 million. This represents
slippage of 2.5 per cent against the revised budget (slippage of nine per cent
against 2022/23).
61.  This underspend is due to a number of factors, mainly, the timing of the
purchase of land at sites within the East Kilbride Community Growth Area and
Brackenhill Farm, Hamilton, with these concluding early in the new financial
year. In addition, there were access issues with a significant number of central
heating systems upgrades and windows and doors projects.
39

Page 40

2. Financial management | 18 
62.  The Council has reviewed the reasons for slippage and reported that there
is no one reason for projects slipping in terms of spend achieved in year. Each
project is different and slippage can be as a result of contractor default, delays
in the supply chain or the impact of weather conditions. The Council has
confirmed that there continues to be no significant risk associated with project
slippage, and tends to be a timing issue only.
63.  Officer meetings take place every four weeks to consider each project on its
own merit. Any variations in spend anticipated are reported to members through
an adjustment to the programme to reflect the revised spend for the year and
achievability in terms of the project deliverables if applicable. These
adjustments are reported on a four-weekly basis to the Executive Committee
and then on an eight weekly basis to the relevant Resources (service)
Committee.
The Council does not undertake valuations as at the year end,
but has provided satisfactory evidence to support its approach
64.  The Council’s valuation team (qualified RICs valuers) have confirmed that
they carried out their valuation duties in line with the RICs professional
standards, and they have provided a formal year-end report to management.
This included a covering report, a Service Level Agreement (SLA) outlining their
conditions of engagement, and an asset review paper (impairment review)
which focussed on identifying any unusual circumstances which would affect
the value of whole categories of assets. They reviewed the NCA that were most
subject to risk in terms of economic influence.
65.  Bodies should carry out valuations as at the year end, i.e. as at 31 March.
However, there is no requirement for this, and bodies may use 1 April (or other
date) subject to the standard condition that the carrying amount at the end of
the year does not differ materially from the current value at that date.
66.  Where a valuation has been carried out at 1 April 2023, a body should
evaluate whether: 
• there have been any movements in value during 2023/24 that should be
reflected in the 31 March 2024 carrying amount
• there is sufficient evidence that supports the body's consideration of the
above is adequate
• it has made necessary adjustments to the 31 March 2024 carrying
amount to reflect any movements that require to be reflected.
67.  The Council adopt a five year rolling programme for the valuation of other
land and buildings. The valuation of these assets for 2023/24 has taken place
as at 1 April 2023. There was a 3.5 per cent increase in the BCIS index year on
year to quarter four, that is, 1 March 2023 to 31 March 2024. The valuer did not
consider this an unusual variance and therefore considered that a
reassessment of the DRC figures was not required out with the 5 year rolling
programme. 
40

Page 41

2. Financial management | 19 
68.  Whilst the Council has demonstrated that the current approach of
undertaking valuations as at 1 April has resulted in appropriate valuations in
accordance with the Code, management should consider valuing at 31 March to
reduce the risk of adjustments being required as a result of material movements
in year. 
The Council completed the review to identify any buildings
containing Reinforced Autoclaved Aerated Concrete and taken
remedial action as required
69.  Reinforced Autoclaved Aerated Concrete (RAAC) was widely used in the
construction of floors and roofs from the 1950s to early 1990s. Recent
investigations have identified that leaks or water exposure could lead to the
deterioration of RAAC planks.
70.  The Scottish Government are working in partnership with the UK
Government on research into the extent of the use of RAAC in public buildings
and public bodies, including the Council, have been advised to check as a
matter of urgency whether any buildings in their estates have roofs, floors,
cladding or walls made of RAAC.
71.  The Council has confirmed that the desktop exercise with focused survey
activity has now been completed on all Non-housing and Housing properties
and remedial action has been taken where required.
Standards of conduct and arrangements for the prevention and
detection of fraud and error were appropriate 
72.  The Council is responsible for establishing arrangements for the prevention
and detection of fraud, error and irregularities, bribery, and corruption.
Furthermore, it is responsible for ensuring that its affairs are managed in
accordance with proper standards of conduct by putting effective arrangements
in place. 
73.  The Council has a range of established procedures for preventing and
detecting fraud and irregularity including a whistleblowing policy, counter fraud
strategy and codes of conduct for members and officers. We assessed these to
ensure that they were appropriate, readily available to staff and are regularly
reviewed to ensure they remain relevant and current.
74.  We have concluded that the Council has appropriate arrangements in place
for the prevention and detection of fraud and corruption.
National Fraud Initiative
75.  The National Fraud Initiative (NFI) is a counter-fraud exercise across the
UK public sector which aims to prevent and detect fraud. The Council
participates in this biennial exercise. The 2022/23 exercise concluded during
the 2023/24 financial year and the final report was published in August 2024
The National Fraud Initiative in Scotland 2024 (audit.scot).
41

Page 42

2. Financial management | 20 
76.  The value of outcomes from the NFI, recorded since the last report, total
£21.5 million (up from the £14.9 million in 2022). The cumulative value of
outcomes from the NFI in Scotland since participation started in 2006/07 now
stands at around £180 million.
77.  The Council continues to participate in the National Fraud Initiative (NFI).
This is a counter-fraud exercise across the UK public sector which aims to
prevent and detect fraud. Internal Audit presented a paper to the RASC in
September 2024 which confirmed that overall outcomes remain relatively.
78.  The Council’s arrangements for investigating and reporting data matches
identified by the NFI are satisfactory.
42

Page 43

3. Financial sustainability | 21 
3. Financial sustainability
Financial Sustainability means being able to meet the needs of the
present without compromising the ability of future generations to meet
their own needs.
Conclusion
The Council transformational change programme is underway to help the Council
achieve a balanced budget, and support medium and long term financial plans. 
The Council has effective budget monitoring arrangements. Given the financial
pressures, the Council is continuing to assess its reserves strategy and review
how it assesses, monitors and reports on its financial resilience.
79.  Exhibit 5 sets out the wider scope risks relating to Financial Sustainability
identified in the 2023/24 Annual Audit Plan. It summarises the audit procedures
performed during the year to obtain assurances over these risks and the
conclusions from the work completed. 
Audit work has addressed the wider scope risks identified in
the Annual Audit Plan
Exhibit 5
Risks identified from my wider responsibility under the Code of Audit Practice
Audit risk Assurance procedure Results and conclusions
Financial Sustainability
South Lanarkshire Council
continues to operate in an
increasingly complex and
challenging environment,
aiming to provide the best
possible service within the
resources available.
Although a surplus position of
£9.0 million is projected for
2023/24, the Council has
identified a savings
requirement of £95.8 million
for the next four years to
2027/28. 
Reviewed the Council’s
annual budget setting
arrangements.
Reviewed and assessed
budget monitoring
arrangements 
Reviewed the Council’s
medium to longer term
financial planning including
how the Council aligns
savings plans and
transformation activity with
strategic priorities.
Reviewed the Council’s
financial position and delivery
of planned savings. 
Results and conclusion: 
The Council recognise the
financial challenges facing
the organisation. A
Transformational Change
programme is underway to
achieve financial
sustainability over the
medium to longer term. 
43

Page 44

3. Financial sustainability | 22 
Audit risk Assurance procedure Results and conclusions
Management have
implemented a programme of
reviews to contribute towards
addressing the financial
pressures. However, there is
a risk that the Council plans
do not deliver the required
savings to address the
projected shortfall.
The Council transformational change programme is underway
to help the Council achieve a balanced budget, and support
medium and long term financial plans
80.  At the Executive Committee meeting in June 2024 management advised
that the budget gap, before any corporate solutions, for 2025/26 was estimated
at £22.355 million. Key elements making up the budget gap are:
• pay and pension items which includes assumed pay award for teachers
and non-teachers: £8.820 million
• Reinstatement / Impact of Prior Year Budget Decisions and includes the
need to reinstate budget to cover one-off savings from previous years
and also to take the benefit of residual impact of previous year
decisions: £11.515 million
81.  In addition the report explained that given the financial horizon, there was a
need to look at the picture not just for the year ahead but for the medium-term
and the report outlined the starting point for the Medium-Term Strategy from
2025/2026 to 2027/2028. As detailed in exhibit 6 the overall budget gap for the
period 2025/2026 to 2027/2028 is £77.275 million.
Exhibit 6
Identified savings requirement 2025/26 to 2027/28 
2025/26 2026/27 2027/28 Total
Savings required 
£’million
£22.355 £24.515 £30.405 £77.275
Source: 2025/2026 to 2027/2028 Revenue Budget Strategy
82.  To address the budget gap, the Council will need to review what services it
can afford to continue to deliver and how these services will be provided. The
Council will need to significantly change what they deliver over the next 3 years
with the focus being on statutory services. There will be difficult decisions to
take on whether the Council can continue to deliver services and if so, what
those services will actually look like.
44

Page 45

3. Financial sustainability | 23 
83.  To achieve a balanced budget, the Council need to have clear medium and
long term financial plans to support transformational change. 
84.  The report to the Executive Committee outlined the Transformational
Change Programme that is underway. This will be a series of cross cutting
reviews, not focussed on one Resource, but on Council-wide activities. The
reviews will start in 2024/2025, and the Council anticipates they will deliver
savings across the term of the three year Budget Strategy. The reviews include:
• Charging: options for full cost recovery where possible
• Procurement: further consideration of procurement practices/options
• Overtime: review of overtime practices and spend
• Management Structure: review to ensure correct balance between
management and the staff they oversee
• Digital Transformation / Customer Contact: review of the use of
technology and how the Council and its customers interact
• Property: right size use of property and look to meet Net Zero targets
• Consideration of in-house and procured services
• Loans Fund: consider any further benefits through Loans Fund
accounting
• Depot Rationalisation: rationalising the number across Resources
• Fleet Reduction: reducing this where efficiencies can be identified.
85.  Progress on each cross-cutting review will be presented to the Performance
and Review Scrutiny Forum (PRSF). In addition, service departments are
considering their own service areas, and a programme of reviews will also take
place to inform savings for the coming year. As these service reviews progress,
proposals will be presented to Members for approval as part of the Budget
setting process.
The Council has effective budget monitoring arrangements.
Given the financial pressures, the Council is continuing to
assess its reserves strategy and review how it assesses,
monitors and reports on its financial resilience 
86.  The Council recognises the financial challenges it faces in the coming
years. As detailed in exhibit 5, as at 31 March 2024, the Council had a total
General Fund balance of £109.773 million. Of this £96.730 million has been
earmarked for a specific priority with a residual balance of £13.043 million of
uncommitted general reserves. 
87.  Councils can hold reserves for a number of reasons. Some reserves are
earmarked for identified expenditure which will, or may occur over the short,
45

Page 46

3. Financial sustainability | 24 
medium or longer term. In addition to these reserves, there are uncommitted
reserves which help manage unforeseen circumstances.
88.  The Local Authority Accounting Panel (LAAP) provides guidance on the
establishment and maintenance of local authority reserves and balances. The
LAAP Bulletin does not prescribe a minimum level of reserves which should be
held by a council. It is for the Council to consider an appropriate level of
reserves taking account of their strategic, operational and financial risks.
However, it does state that reserves should not be held without a clear purpose. 
89.  The Council intends to review and present an updated Reserves Strategy to
the Finance and Corporate Resources Committee in Autumn 2024, following the
conclusion of the 2023/24 Annual Accounts.
90.  The Chartered Institute of Finance and Public Accountancy (CIPFA)
introduced a Financial Management Code for implementation by 31 March
2021. This provides “guidance for good and sustainable financial management
in local authorities. By complying with the principles and standards within the
code, authorities will be able to demonstrate their financial sustainability”. A key
goal of the FM Code is to improve and evidence the financial resilience of
organisations by embedding enhanced standards of financial management.
91.  In our 2022/23 Annual Audit Report we recommended that given the scale
of the financial challenges facing the Council it should ensure that in developing
its financial strategy and annual budget there is a clear consideration around its
financial resilience, including the level of reserves to allow the Council to meet
unforeseen costs and pressures. We also recommended that the Council
should also enhance the level of monitoring around financial resilience
indicators and risks.
92.  The Council has an effective financial planning and monitoring
arrangements in place, with regular reporting throughout the year. Through the
2025/2026 to 2027/2028 Revenue Budget Strategy the Council demonstrates a
clear understanding of the budget pressures it faces. 
93.  The Council intends to present a more detailed report on resilience to the
Risk and Audit Scrutiny Committee in September 2024.
Recommendation 4
The Council should ensure that there is a clear risk assessment and scrutiny of
the level of reserves held and how this supports financial resilience and
sustainability over the medium term. 
46

Page 47

4. Best Value | 25 
4. Best Value 
Councils have a statutory duty to make arrangements to secure
continuous improvement in the performance of their functions.
Conclusions
The Council’s Workforce Plan 2022-25 is supported by detailed service level
plans, however there is an opportunity for this to have a more strategic focus. 
The Council is using digital technology to support new ways of working but has
not yet set out how it plans to use digital technology to shape its future workforce. 
Our follow up work of Best Value improvement recommendations from 2022/23
concluded that the Council has now addressed these recommendations.
Best Value work in 2023/24
94.  For 2023/24, the scope of Best Value work included conclusions on:
• Workforce Innovation (2023/24 thematic work)
• Council service performance improvement 
• Effectiveness of council performance reporting 
• Progress made against Best Value improvement actions made in previous
years
95.  As set out in the Code of Audit Practice 2021, Best Value audit is integrated
with other wider-scope annual audit work. Therefore, in addition to the work set
out in the remainder of this section, Best Value work has informed the content
and conclusions set out in parts 3 to 6 of this Annual Audit Report.
Workforce Innovation priorities 
96.  Annual thematic Best Value work is set by the Accounts Commission. For
the 2023/24 financial year, auditors were asked to focus on workforce
innovation within the council. The results of this work were reported to elected
members at the Risk and Audit Scrutiny committee on 25 June 2024. This
report will be published on the Audit Scotland website in due course. The key
findings in this report are:
• The Council’s Workforce Plan 2022-25 is supported by detailed service
level plans, however there is an opportunity for this to have a more
47

Page 48

4. Best Value | 26 
strategic focus. The Council has not had a corporate level workforce
strategy since 2019. 
• The Council and service-level workforce plans capture the workforce
challenges however actions need to be SMART to allow progress to be
monitored and reported.
• While the Council’s service-level workforce plans contain workforce data,
there is no workforce data included in the Council-level Workforce Plan.
• The Council has developed a comprehensive toolkit to help services with
workforce planning.
• The Council is using digital technology to support new ways of working but
has not yet set out how it plans to use digital technology to shape its future
workforce. The introduction of Oracle Fusion provides the Council with
opportunities to create efficiencies and the increased use of digital
technology in education is providing more choice for pupils.
• The Digital Strategy 2022-27 sets out an intention to address digital
exclusion. Around ten per cent of employees who responded to a digital
skills survey identified that they do not have basic digital literacy.
• The Council recognises the need for innovative skills and capacity
measures in light of the workforce recruitment and retention challenges it
faces. The Council uses a number of approaches to improve the skills and
capacity of its future and existing workforce.
• The Council reports detailed council-wide and resource-level workforce
monitoring information to Committee quarterly although there is scope for
the content to be further developed.
97.  The audit recommendations from the thematic report, together with the
management responses, are included in Appendix 1 of this report. 
Follow up of Best Value improvement recommendations from
2022/23 
98.  For the 2022/23 financial year, auditors were asked to focus on the councils’
leadership of the development of new local strategic priorities. The 2022/23
Best Value Thematic report contained two improvement recommendations in
respect of the Council’s compliance with the Fairer Scotland Duty and ongoing
support for Elected Members. 
99.  Our follow up work has concluded that the Council has now addressed
these recommendations.
48

Page 49

5. Vision, leadership and governance | 27 
5. Vision, leadership and
governance
Public sector bodies must have a clear vision and strategy and set
priorities for improvement within this vision and strategy. They work
together with partners and communities to improve outcomes and foster
a culture of innovation.
Conclusions
The Council has a clear vision, strategy, and priorities. 
The Council has effective and appropriate governance arrangements for delivery
of its plans. 
A new Chief Executive and Director of Finance and Corporate Resources were
appointed during 2023/24. 
The Council has a Management Development programme in place to support
succession planning.
The Council has clearly articulated its vision and priorities
100.  The Council’s Connect Plan 2022-27 is the strategic document that sets
out the Council’s vision, values and objectives and what difference this will
make to the residents and communities of South Lanarkshire. 
101.  The Council’s vision is ‘to improve the lives and prospects of everyone
in South Lanarkshire’. It sets out the key actions to be delivered over five
years, around a long-term vision with three key priorities and supported by six
detailed outcomes.
Governance arrangements are effective and appropriate 
102.  The Council’s governance arrangements have been set out in the Annual
Governance Statement in the annual accounts. We have reviewed these
arrangements and concluded that they are appropriate. This is informed by our
regular attendance at the Risk and Audit Scrutiny Committee and review of
Council, Executive Committee and other committee papers as appropriate.
103.  We have concluded that overall, the Council has appropriate governance
arrangements in place which support effective scrutiny, challenge and decision
making.
49

Page 50

5. Vision, leadership and governance | 28 
A new Chief Executive and Director of Finance and Corporate
Resources were appointed during 2023/24
104.  The Council has an experienced management team in place that has been
relatively stable in recent years. During August 2023 the then Chief Executive,
announced his intention to retire. The previous Director of Finance and
Corporate Resources and Deputy Chief Executive was appointed as the new
Chief Executive and started in his new role in January 2024.
105.  In March 2024, the previous Head of Finance (Strategy) was appointed as
the Director of Finance and Corporate Resources. In turn, the Head of Finance
(Strategy) was backfilled through an internal appointment. Finance are
continuing to review staffing and backfill arrangements are being progressed to
ensure capacity within the department.
The Council has a Management Development programme in
place to support succession planning
106.  The Council offers three levels of management development training in
conjunction with the Chartered Management Institute to support succession
planning:
•  Ambition (entry) level for employees managing small teams
• Consolidation level for employees who are practising managers or team
leaders
• Development level for senior managers. This includes training on project
management, coaching, collaborative working and managing change. 
107.  In addition to the Management Development programme for all managers,
the Council operates a leadership challenge programme to develop ‘rising stars’
and assist with succession planning. Executive Directors select employees to
take part in this. It includes skills and attitudes tests, access to speakers to help
participants think beyond their current role, participation in service reviews in a
different part of the Council and mentoring and coaching. The purpose of the
Leadership Challenge is for the Council to ensure its leaders and managers can
adapt to different situations and changing circumstances, and can inspire,
challenge and encourage.
50

Page 51

6. Use of resources to improve outcomes | 29 
6. Use of resources to improve
outcomes
Public sector bodies need to make best use of their resources to meet
stated outcomes and improvement objectives, through effective
planning and working with strategic partners and communities.
Conclusions
The Council has an effective performance management framework in place. 
The Council’s overall performance has improved compared to its prior year results
but has declined compared with the Scottish average. 
The Council has effective and appropriate arrangements in place to ensure that
resources are deployed to improve strategic outcomes, that meet the needs of
service users.
The Council has an effective performance management
framework in place
108.  The Best Value: Revised Statutory Guidance 2020 sets out that councils
should be able to demonstrate a trend of improvement over time in delivering its
strategic priorities. 
109.  The Best Value: Revised Statutory Guidance 2020 also sets out that
performance management arrangements should be in place to promote the
effective use of the local authority’s resource, which includes effective
performance reporting.
110.  In addition to the annual reporting on LGBF performance, the Council
engaged with the Improvement Service in 2021/22 to look at how it uses and
reports on the Local Government Benchmarking Framework (LGBF). This
aimed to produce a suite of refined indicators that the Council could use to
better reflect its priorities and allow for scrutiny on its identified improvement
areas. 
111.  In 2024, the Improvement Service (IS) launched an online dashboard as
the main portal to access LGBF data and analysis. The dashboard is part of the
commitment by SOLACE and COSLA to develop better measurement and
comparable data as a catalyst for improving services, targeting resources to
areas of greatest impact, and enhancing public accountability.
51

Page 52

6. Use of resources to improve outcomes | 30 
112.  As part of this, the IS offered to work with interested councils to explore
how dashboard technology could be used at a local level to improve
engagement with and use of the LGBF.
113.  Building on the review of LGBF reporting undertaken in 2021-22, South
Lanarkshire took the opportunity to work with the IS to develop a South
Lanarkshire version of the LGBF dashboard. Key features of the South
Lanarkshire Council dashboard:
• based on the 36 “priority indicators” aligned to the council plan outcomes
• focuses on SLC vs Scotland vs family group average performance
• allows drill-down to examine family group members and their performance
• provides at-a-glance time-trend information for each indicator
• presents the LGBF data for SLC along with local.
114.  Of the 102 LGBF indicators, 36 have been identified as aligning with the
outcomes of the Council’s Connect Plan. These are now embedded within the
Connect Plan’s reporting to focus attention on how well the Council is
performing in achieving its strategic outcomes.
The Council’s overall performance has improved compared to
its prior year results but has declined compared with the
Scottish average
115.  The Council participates in the Local Government Benchmarking
Framework (LGBF). The framework brings together a wide range of information
about how all Scottish councils perform in delivering services, including the cost
of services and how satisfied citizens are with them. The Council notes that the
use of the LGBF allows it to self-assess its performance across years, and to
compare performance with peers against an agreed suite of performance
indicators, which will assist in achieving best practice and efficiencies. 
116.  The most recent National Benchmarking Overview Report 2022-23
(improvementservice.org.uk) by the Improvement Service was submitted to the
Council’s Performance and Review Scrutiny Forum in March 2024 along with a
Council specific action plan. When comparing the indicator’s reported, the
Council’s overall performance has improved against its own prior year
performance. Details of the Council’s trend over the past four years against
these performance indicators can be seen at exhibit 7. 
117.  Across the 102 indicators in 2023/24, the Council’s performance has
improved against 52 (51 per cent) and declined against 31 (30 per cent). In
terms of the Council’s figures relative to the Scottish average, performance was
better than Scottish average for 47 (46 per cent) indicators. This is a decrease
on the prior year results of 51 per cent. 
52

Page 53

6. Use of resources to improve outcomes | 31 
Exhibit 7
South Lanarkshire Council analysis of LGBF results 
Number of
indicators
(%) 2019/20
Number of
indicators
(%) 2020/21
Number of
indicators (%)
2021/22
Number of
indicators
(%) 2022/23
Performance    
Improving performance 35 (39%) 36 (38%) 39 (39%) 52 (51%)
Declining performance 45 (49%) 36 (38%) 53 (54%) 31 (30%)
No change in
performance
1 (1%) 2 (2%) 3 (3%) 4 (4%)
Information not available 10 (11%) 21 (22%) 4 (4%) 15 (15%)
Comparison with
Scottish Average    
Better than Scottish
average
42 (46%) 37 (39%) 50 (51%) 47 (46%)
Worse than Scottish
average
39 (43%) 37 (39%) 43 (43%) 38 (37%)
Same as Scottish
average
0 (0%) 0 (0%) 2 (2%) 2 (2%)
Information not available 10 (11%) 21 (22%) 4 (4%) 15 (15%)
Source: LGBF 2022/23 (2022/23 Results at 30 April 2024)
118.  The Council has an improvement action plan for all the indicators,
including those reported as being below the Scottish average. The Council also
undertakes family group analysis, which focuses on those indicators performing
worse than the Scottish average. This aims to group councils into a “family
group” of councils with similar levels of deprivation and urban profiles, providing
better context to the results.
119.  At a service level, under-performing LGBF measures are included in the
horizon-scanning and self-assessment exercise undertaken each year. This
draws attention to poor performance in the LGBF and services are asked to
review the figures and provide narrative about reasons why and any actions
necessary which would feed into Resource Plans and improvement actions
throughout the year.
53

Page 54

6. Use of resources to improve outcomes | 32 
The Council is on track to achieve most performance measures
however the percentage of reports submitted to the Children’s
Reporter within agreed timescales did not meet the target
120.  The Council reviews its performance using a number of measures that are
aligned to the priorities and outcomes set out in the Council Plan. A total of 272
measures were identified within Resource Plans for 2023/2024. Of those 68 (25
per cent) are linked to the achievement of the Connect Outcomes detailed in the
Council Plan. The measures are detailed within the individual Resource Plans
and bi-annual progress reports are publicly reported on the performance pages
of the Council’s website. 
121.  In addition, the Connect 2022-27 Quarter 2 Progress Report 2023/2024
was reported to the Performance and Review Scrutiny Forum in December
2023. The progress reports include a summary of performance against
measures for each of the Council’s Connect Plan objectives, along with details
of the main achievements for that objective.
122.  The Connect quarter two progress report for 2023/24 reports that of the
Council’s 68 strategic performance measures, three projects had been
completed (four per cent); 44 projects, the timescale or target had been met (65
per cent); eight projects where there was minor slippage in timescale or target
(12 per cent) and 12 where the information was not yet available and would be
reported at a later date (18 percent). Of the remaining measures, one
experienced significant issues (one percent). This was:
• The percentage of reports submitted to the Children’s Reporter within
agreed timescales: In quarter two, 37 out of 53 (70 per cent) of reports
were submitted within timescales, 88 out of 139 (63 per cent) for the year
to date. Due to staff vacancies of just over 30 per cent within local teams,
some reports have been submitted beyond the deadline. Service
managers are working closely with operational teams to prioritise
workloads and ensure that children and their families are not adversely
affected by any delays. A more flexible approach to recruitment is being
taken with social worker students on placement with South Lanarkshire
guaranteed a job interview and practice educator support with the
interview process. This has resulted in an increase in the recruitment of
newly qualified workers in the first year 
123.  Performance management and reporting is well established within the
Council. This provides members the opportunity to scrutinise the Council’s
performance against its strategic objectives. Despite the ongoing service
pressures the Council has achieved or is on track to achieve most of its
performance measures as set out in its Connect Plan. 
The Council is working effectively with partners to meet stated
outcomes and improvement objectives 
124.  The Council is part of the South Lanarkshire Community Planning
Partnership (CPP) and the Community Planning Partnership Board (CPPB)
which has a key role in progressing Community Planning. 
54

Page 55

6. Use of resources to improve outcomes | 33 
125.  The CPPB’s remit is to provide collective strategic leadership, direction,
governance and oversight of partnership activity with local communities to
support the delivery of its agreed vision and outcomes.
126.  Following a full review of Community Planning structures and plans, the
Community Planning Partnership Board approved a new Thematic Board
structure in March 2023. In September 2023, the Board approved its revised
Governance Framework. The final part of the review is to develop a proposal for
partnership working at a locality level. Work continues with the Outcomes Leads
Group to deliver on this.
127.  The Council approved the Community Wealth Building (CWB) Strategy in
March 2021 and subsequently the CWB Commission was set up to engage a
wide range of partners and stakeholders in the CWB agenda. A community
wealth building action plan for the delivery of the CWB strategy was first
approved by the Community wealth building Commission in August 2021 with
annual reports providing progress updates.
128.  The Commission for South Lanarkshire includes the Council, NHS
Lanarkshire, third sector representatives VASLan, the University of the West of
Scotland and the Federation of Small Businesses. The Commission also
includes representation from senior elected members, and community
representation through the involvement of the CPP locality groups.
129.  The draft 2022/23 annual report was presented to the CWB commission in
September 2023 for approval. A review of the Community Wealth Building Risk
Register is underway. The outcome of the review will be reported to the CWB
Commission later this year.
South Lanarkshire Council has satisfactory arrangements for
the preparation and publication of Statutory performance
information (SPIs)
130.  The Accounts Commission’s 2021 Statutory Performance Direction defines
the performance information that councils must publish. The Commission does
not prescribe how councils should report this information but expects them to
provide the public with fair, balanced, and engaging performance information.
131.  Our work in 2023/24 has confirmed that the Council’s performance
reporting arrangements were satisfactory. The Council’s website covers all the
requirements set out in the SPI direction issued by the Accounts Commission.
The Council continues to improve its public reporting of performance
information through clear alignment of performance information with its key
strategic outcomes. 
132.  Alongside overarching and service level performance reporting the Council
publishes Annual Performance Spotlights, 'bite-sized' performance information,
per Connect Outcome which includes:
• a case study to illustrate how the Council is working towards achieving
outcomes
55

Page 56

6. Use of resources to improve outcomes | 34 
• infographics giving a visual presentation of performance; identifying
whether or not performance is improving
• links to additional more detailed information.
133.  To continue to enhance the performance reporting on the website the
Council could include information on the reasons for year on year changes in
performance and where performance is below target, details of measures to
address this.
134.  The performance information included within the Annual Performance
Spotlights shows that for a number of indicators, year on year, the Council is
performing above the targets set. Whilst this is a positive result; there is an
opportunity for the Council to review the target benchmarks to ensure that they
remain challenging and support continuous improvement.
56

Page 57

Appendix 1. Action plan 2023/24 | 35 
Appendix 1. Action plan
2023/24 
2023/24 recommendations 
Issue/risk Recommendation  Agreed management
action/timing
1. Council house valuations
The approach taken by the
Council draws on elements of
Guidance for Valuers issued
in 2016, however only one
beacon property is used as a
basis for the full council
house stock held by the
Council.
Risk: There is a risk that the
council house stock is not
valued in line with applicable
guidance.
The valuer should detail the
valuation process followed,
assumptions that have been
made and supporting
information so that the entire
process, sources of
information and assumptions
provide suitable assurances
to management.
In addition the valuer should
review the current valuation
process against applicable
guidance to assure
themselves that the valuation
process remains fit for
purpose.
Paragraph 19 
Accepted 
The Head of Property has
detailed the process followed
and has confirmed that the
valuation method used for
council house valuations
follows the Beacon method.
This valuation process
matches the applicable
guidance and therefore the
valuation process is fit for
purpose.
Responsible officer: 
Head of Property 
2. IFRS 16 Implementation
From 1 April 2024, a new
International Financial
Reporting Standard, IFRS 16,
will come into effect for Local
Authorities. The Council is
not yet in a position to
quantify the likely impact of
IFRS 16.
Risk: there is a risk that the
Council do not progress the
implementation of IFRS 16 in
line with the project plan.
The Council should review
the current timetable to
ensure that key dates are
being achieved to allow
implementation in line with
the project plan.
Paragraph 32 
Accepted
The Council is aware of the
requirements of IFRS 16 and
is working towards the
implementation date of end
March 2025. 
Responsible officer:
Head of Finance
Agreed date:
End March 2025 
3. Statutory override
The statutory override
relating to valuation of
The Council should
proactively work with CIPFA
and the wider local
government sector to arrive
Accepted 
57

Page 58

Appendix 1. Action plan 2023/24 | 36 
Issue/risk Recommendation  Agreed management
action/timing
infrastructure assets is due to
end for the 2024/25 financial
statements.
Risk: A permanent solution
has not yet been agreed and
CIPFA believe that this will
continue be an area of
enhanced scrutiny for local
government auditors.
at appropriate solution for the
implementation of accounting
for infrastructure assets.
Paragraph 36 
The Council is keeping a
watching brief on national
discussion on this topic and
will continue to engage with
CIPFA and other bodies
where possible, to arrive at a
suitable solution.
Responsible officer:
Head of Finance
Agreed date:
End March 2025
4. Reserves strategy and
financial resilience
In our 2022/23 Annual Audit
Report we recommended that
the Council should enhance
the level of monitoring around
financial resilience indicators
and risks. 
Risk – This Council is
preparing a detailed report on
resilience to the Risk and
Audit Scrutiny Committee in
September 2024.
The Council should ensure
that there is a clear risk
assessment and scrutiny of
the level of reserves held and
how this supports financial
resilience and sustainability
over the medium term.
Paragraph 93 
Accepted
The Council has presented a
report to the Risk and Audit
Scrutiny Forum detailing the
Council’s Resilience
Framework.  
A further report on the
Council’s Reserves position
will be presented to the
Finance and Corporate
Resources Committee in the
Autumn. This will detail the
level of reserves held by the
council, their purpose, and
will note their role in financial
resilience.
Responsible officer:
Head of Finance
Agreed date:
End November 2024
2023/24 recommendations from the BV thematic report 
Issue/risk Recommendation  Agreed management
action/timing
5. Corporate level
workforce strategy
supported by clear
reporting on actions
The Council does not have a
corporate level workforce
The Council should develop a
corporate level workforce
strategy to demonstrate a
clear link to the Connect
Council Plan 2022-27. The
Council should build on the
Management response 
The Council will complete an
updated Workforce Strategy
for 2025-2027 with
accompanying workforce
plans to align to the Council
58

Page 59

Appendix 1. Action plan 2023/24 | 37 
Issue/risk Recommendation  Agreed management
action/timing
strategy. The Council level
workforce plan does not
include or refer to workforce
data, such as the age profile
of its workforce, the number
of casual staff used or
indicators of staff wellbeing.
Nor does it include any
information on what it is
currently doing to address
any workforce capacity
issues or how it plans to
develop its future workforce.
Risk – There is a risk that the
Council is not using
workforce data to inform
workforce planning that links
to its strategic priorities.
workforce planning to date
and implement a more
strategic, data-driven
approach to workforce
planning, with SMART action
plans, setting out how
Council level and service
level actions are being
progressed. 
Plan Connect Business
Planning Cycle. 
The Council will create a
strategic workforce plan for
2025– 2027 to align with the
Council plan and will also
create workforce plans for
this period and reference the
data analysis and findings
more clearly to show both the
high-level actions and
specific resource actions.
Responsible officer
Head of Personnel Services
Actioned by
31 March 2025
6. Digital technology
The Council is at an early
stage in establishing links
between workforce planning
and digital technology
Risk – There is a risk that the
workforce planning is not fully
utilising the benefits of digital
technology.
The Council should develop
measures to capture and
monitor the impact of digital
technology on workforce
productivity and service
outcomes. It should also set
out how it expects digital
technology to shape its future
workforce. 
Management response 
The Council will include links
in the 2025-2027 workforce
strategy and plans to digital
technology. The Council will
include measures to capture
and monitor the impact of
digital technology.
Responsible officer
Head of Personnel Services
Head of IT Services 
Actioned by
31 March 2025
7. Digital Exclusion
Digital inclusion is one of 21
principles set out in the
Digital Strategy 2022-27 and
is also one of eight themes.
The Council is progressing a
number of initiatives to
support digital inclusion.
Risk – There is a risk that
without a SMART action plan
to monitor progress the
Council cannot demonstrate it
The Council should develop
an action plan to allow it to
monitor progress in
addressing digital exclusion
in its workforce and for its
citizens. 
Management response 
The Council will develop an
action plan within its
workforce plans that will
detail the next steps in
progressing digital inclusion
in its workforce. For its
citizens, this will be captured
within the digital strategy
action plans.
Responsible officer
59

Page 60

Appendix 1. Action plan 2023/24 | 38 
Issue/risk Recommendation  Agreed management
action/timing
is achieving the principles set
out in the Digital Strategy.
Head of Personnel Services
Head of IT Services 
Actioned by
31 March 2025
Follow-up of prior year recommendations
Issue/risk Recommendation and
Agreed Action 
Progress
1. Capital programme
At the June 2023 Executive
Committee, the general
services outturn capital
programme spend was
reported as £65.736 million
for 2022/23, against original
budget representing a
slippage of 20 per cent.
The housing capital
programme outturn was
reported as £60.695 million
for 2022/23, against the
revised budget of £66.361
million. This represents
slippage of nine per cent
against the revised budget
Risk – Delayed investment
can lead to inefficiencies in
the existing estate with
adverse impact on service
delivery.
The Council should review the
underlying reasons for
recurring slippage within the
capital programmes to identify
opportunities to review project
management and budget
setting procedures in place.
Management Response:
The Council has reviewed the
reasons for slippage in year
and we report movements to
members on a monthly basis.
We are satisfied that there has
been no significant risk
realised from this slippage,
however, we will work with the
officers delivering projects to
set realistic budgets for capital
expenditure.
Responsible officer:
Head of Finance
Agreed date:
31 March 2024
Implemented 
In February 2024, the
Council approved the
2024/2025 capital
programme based on
achievable spend levels.
Any slippage experienced
and the reasons for it, will
continue to be subject to
review with any financial
and operational impact
advised to members as
appropriate. 
2. Asset valuation
The Council adopt a five year
rolling programme for the
valuation of other land and
buildings. The valuation of
these assets for 2022/23 has
taken place as at 1 April
2022.
The Council should consider
their approach to the valuation
of land and buildings to ensure
this is appropriate to assess
whether asset values have
moved materially in year and
as at 31 March. 
The valuer should also issue a
formal year end valuation
report to provide the required
Implemented
The Council’s valuation
team produced a formal
year end valuation report
detailing the valuation duties
in line with RICs
professional standards.
The Council assessed
current conditions and has
60

Page 61

Appendix 1. Action plan 2023/24 | 39 
Issue/risk Recommendation and
Agreed Action 
Progress
Although the Council were
able to provide the required
information and supporting
documentation to support the
valuations undertaken during
the year, the valuer does not
produce a formal year end
valuation report.
management assurances
enabling greater oversite and
scrutiny by management of the
suitability of the key
assumptions and approach
adopted by the valuer. 
Management Response:
The Council’s valuation team
will produce a formal year end
valuation report. 
The council has assessed in
2022/23 that the asset values
have not materially moved in
year and will continue to
consider valuation dates. 
Responsible officer:
Head of Property / Head of
Finance 
Agreed date:
31 March 2024
ascertained that the asset
values in the balance sheet
are not materially misstated. 
3. Payroll reconciliations
The Council’s internal
guidance requires that all
payroll must be reconciled at
least once a month. Payroll
reconciliations were not
carried out on a regular basis
during 2022/23.
The Council should ensure
payroll reconciliations are
undertaken in line with internal
guidance.
Management Response:
The payroll reconciliations are
up to date for 2023/24
Responsible officer:
Head of Finance 
Agreed date:
October 2023
Implemented
All payroll reconciliations for
2023/2024 are complete. 
4. Transformational change
The Council should continue
to identify where it can
progress transformational
change in how its services
are delivered. This should
identify where recurring
savings, rather than
temporary solutions, can be
The Council should continue to
identify where it can progress
transformational change in
how services are delivered to
address the longer-term
financial pressures it faces.
Management Response:
The Council has a programme
of reviews that have and will
Ongoing
The Council has a
programme of cross-cutting
reviews as well as individual
Resource Reviews which
will assist in bridging the
budget gap moving forward. 
61

Page 62

Appendix 1. Action plan 2023/24 | 40 
Issue/risk Recommendation and
Agreed Action 
Progress
made together with proposals
to reduce costs.
continue to contribute towards,
addressing financial pressures. 
Responsible officer:
Executive Director, Finance
and Corporate Resources
Agreed date:
Ongoing
5. Financial resilience
Given the scale of the
challenges there is an
opportunity to enhance its
focus on financial resilience,
including greater emphasis
on its reserves position; clear
financial resilience indicators
and measures; and alignment
to risks ensuring there is a
clear financial strategy to
support a resilient council.
Given the scale of the financial
challenges facing the Council it
should ensure that in
developing its financial
strategy and annual budget
there is a clear consideration
around its financial resilience,
including the level of reserves
to allow the Council to meet
unforeseen costs and
pressures. The Council should
also enhance the level of
monitoring around financial
resilience indicators and risks.
Management Response:
Through consideration of level
of reserves, specific resilience
indicators, and financial
planning and management, we
already understand and
mitigate as much as we can
against unforeseen costs and
pressures. 
We will look to further develop
the Council’s approach to
monitoring and reporting on
resilience.
Responsible officer:
Head of Finance
Agreed date:
31 March 2024
Ongoing
A paper detailing the
Council’s consideration of
its financial resilience is to
be presented to the
September 2024 meeting of
the Risk and Audit Scrutiny
Committee.
6. Fairer Scotland
Assessment
The Fairer Scotland Duty
came into force from 1 April
The Council should continue
its work to embed its Fairer
Scotland duties by completing
and referencing Fairer
Implemented
The Council’s monitoring
officer issued guidance to all
Resources and Admin staff
62

Page 63

Appendix 1. Action plan 2023/24 | 41 
Issue/risk Recommendation and
Agreed Action 
Progress
2018. It places a legal
responsibility on local
authorities to actively
consider how they can
reduce inequalities of
outcome caused by socio-
economic disadvantage,
when making strategic
decisions.
Risk – There is a risk that the
Council is not fully complying
with the Fairer Scotland Duty.
Scotland assessments in
council papers, strategies and
plans. It should also check all
assessments are listed online.
Management Response:
We will continue to embed
Fairer Scotland duties, and
remind all officers on the
Council’s Fairer Scotland
Duties and the use of Fairer
Scotland Assessments by
reissuing the guidance and
arranging further training as
appropriate. We will ensure
that reference to Fairer
Scotland assessments are
made in committee reports
(where carried out). All Fairer
Scotland Assessments will be
posted online.
Responsible Officer:
Head of Administration and
Legal Services
Date:
31 December 2023
to publicise the duty and to
make sure that it is followed. 
Fairer Scotland
Assessments are published
on the Council’s website.
7. Ongoing support for
Elected Members
In May 2022, the Council put
in place a comprehensive
induction programme.
Committee members feel
overwhelmed by the volume,
complexity and technical
nature of some committee
papers.
Risk – There is a risk that the
current suite of training is not
tailored to the individual
needs of Elected members.
Officers should continue to
engage with elected members
to support their training and
development requirements,
including specific training to
build confidence and allow
scrutiny.
Management Response:
The programme of
engagement with members on
training requirements will
continue. The annual needs
assessments will be carried
out to inform ongoing training
plans.
Responsible Officer:
Head of Personnel
Date:
Implemented
An annual needs
assessment was carried out
in March 2024 with a
catalogue of training
sessions being compiled for
members to choose from. 
63

Page 64

Appendix 1. Action plan 2023/24 | 42 
Issue/risk Recommendation and
Agreed Action 
Progress
31 March 2024 
64

Page 65

Appendix 2. Summary of uncorrected misstatements | 43 
Appendix 2. Summary of
uncorrected misstatements 
We report all uncorrected misstatements in the annual report and
accounts that are individually greater than our reporting threshold.
The table below summarises uncorrected misstatements that were noted during
our audit testing and were not corrected in the financial statements.
Cumulatively these errors are below our performance materiality level as
explained in Exhibit 1. We are satisfied that these errors do not have a material
impact on the financial statements.
Narrative Account
areas
Comprehensive Income
and Expenditure
Statement
Balance Sheet
Accounting Misstatements 
Dr Cr Dr Cr  
£0 £0 £0 £0 
Narrative Disclosure Misstatements 
65

Page 66

Appendix 2. Summary of uncorrected misstatements | 44  
South Lanarkshire Council
Proposed 2023/24 Annual Audit Report 
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
AS.4.0 
66

Page 67

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 24 September 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Audited Annual Accounts 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise members of the requirement to approve the Annual Accounts 2023/2024
for signature, both Council and related Charitable Trusts 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):
[recs]
(1) that it be noted that the South Lanarkshire Council Accounts 2023/2024 and
the Charitable Accounts have received a clean audit certificate;
(2) that the audited South Lanarkshire Council Accounts 2023/2024 and the
Charitable Trusts’ Accounts be approved for signature; 
(3) that it be noted that the External Auditor’s Report will be referred to South
Lanarkshire Council for information; and
(4) that it be noted that the Audited Accounts 2023/2024 will be available on the
Council’s website (section 3.6). 
[1recs]
3. Background
3.1. Following the publication of The Local Authority Accounts (Scotland) Regulations
2014, the members of the Committee are required to meet to consider approval of
the Audited Accounts for signature. 
3.2. The submission date for local government is generally set to be consistent with the
date specified in accounts regulations by which a body is required to approve its
audited annual accounts. For 2023/2024, the submission date has returned to the
pre pandemic date of 30 September.   
3.3. The members are also required to have regard to any report made or advice
provided on the Annual Accounts by the External Auditor. 
3.4. The External Auditor’s Report was included as an earlier report to this meeting and
will be referred to a meeting of South Lanarkshire Council for information. 
3.5. Copies of the (unsigned) Audited Accounts 2023/2024, for both the Council and
Related Charities, have been emailed to members of this Committee under separate
cover.  Copies of the Council’s Audited Accounts, the Charitable Trusts’ Audited
Accounts and the External Auditor’s Report will be issued to all Elected Members for
their information. 
5
67

Page 68

3.6. Once signed, the Audited Accounts will be available to the general public on the
Council’s website and we can arrange to send a copy out to anyone who requests
them. 
4. Audited Accounts – South Lanarkshire Council 
4.1. As noted in section 3.1, members of the Committee are required to approve the
Audited Accounts for signature.  A copy of the Audited Accounts for 2023/2024 are
being emailed to Members of this Committee under separate cover. 
4.2. As detailed in an earlier report to this Committee, at the time of writing, the Council’s
External Auditors, Audit Scotland, are in the process of completing the audit which
extends across the 2023/2024 Accounts and related matters. 
4.3. The report notes that, at the time of writing, the External Auditor has provided a clear
Audit Certificate with no qualifications on the Council’s Accounts. 
4.4. The External Auditor’s Report also includes an agreed action plan at Appendix 1. 
Officers of the Council will work to ensure that these actions are implemented during
2024/2025. 
5. Audited Accounts – Charitable Trusts
5.1. Members of the Committee are required to approve the Charitable Trusts’ Audited
Accounts for signature.  A copy of the Audited Accounts for 2023/2024 have been
emailed to Members of this Committee under separate cover. 
5.2. The External Auditor also reports on the 2 Charitable Trusts managed by the
Council: South Lanarkshire Council Educational Trust and South Lanarkshire Council
Charitable Trust.   
5.3. The External Auditor’s report shows a clear audit certificate for each Trust.   
6. Employee Implications
6.1. There are no direct employee implications from this report. 
7. Financial Implications
7.1. There are no direct financial implications arising from this report.  The Annual
Accounts received a clear audit certificate.  Any changes identified in the External
Auditor’s report have been made and the impact on the Council’s outturn reflected in
the Audited Accounts. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council and Charitable Annual Accounts is a
qualified audit report. The risk has been assessed as low due to the detailed
preparation in relation to the year end process, technical training undertaken by key
finance staff and the roll out of this to Resource finance staff as appropriate. Finance
and Resources work together to achieve key deadlines and actions set from
timetables. 
68

Page 69

10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
10.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor 
Executive Director (Finance and Corporate Resources) 
10 September 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 South Lanarkshire Council Annual Accounts 2023/2024 and External Auditor’s Report.
 Charitable Trusts’ Annual Accounts 2023/2024 and External Auditor’s Report.
 Financial Ledger 2023/2024 and associated working papers. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601  (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
69

Page 70

70

Page 71

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee  
Date of Meeting: 24 September 2024
Report by: Executive Director (Finance and Corporate Resources)    
Subject: 2022 National Fraud Initiative Exercise 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise the Risk and Audit Scrutiny Committee (RASC) of the outcome of
investigations undertaken as part of the 2022 National Fraud Initiative (NFI)
exercise
 provide a summary of Audit Scotland’s report – The National Fraud Initiative in
Scotland 2022 (published August 2024), highlighting key points specifically in
relation to South Lanarkshire Council and any further action required 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendations:- 
(1) that South Lanarkshire Council’s outcomes from the 2022 NFI exercise are
noted;
(2) that the summary of Audit Scotland’s 2022 NFI Exercise report is noted; and
(3) that the action in Appendix 8 is agreed. 
3. Background
3.1. The NFI is a counter fraud exercise, which cross matches data from councils and other
public bodies. These bodies then investigate the matches. The Cabinet Office is
responsible for the UK-wide delivery of the NFI exercise with Audit Scotland co-
ordinating the exercise in Scotland. 
3.2. South Lanarkshire Council (SLC) has taken part in NFI exercises since 2004/2005. 
These exercises are undertaken every 2 years and include data from benefits, payroll,
creditors and blue badge holders along with a match of the electoral register to council
tax records to detect where single person discount (SPD) has been claimed despite
there being more than one person over 18 in the household. In addition to being
matched to other benefits and payroll data, records are also matched to DWP
deceased persons’ records. 
3.3. Internal Audit co-ordinates the delivery of the NFI exercise within SLC; however, each
Resource is responsible for investigating matches relevant to them.  Internal Audit
reports progress to the Council’s External Auditors throughout the year. 
4. 2022 NFI Exercise Results
4.1. There were 9 match areas covered in the current NFI exercise. These are listed in
Appendix 1.  
6
71

Page 72

4.2. In June 2023, the RASC were advised that there were 26,026 matches across these
match areas.  Following further data refreshes and a subsequent release of additional
matches1, the final number of matches for SLC from the 2022 NFI Exercise was 28,090
(see Appendix 2).   
4.3. From the list of matches received, a target number of investigations is determined, on
a risk basis, and passed to Resources to investigate. There is no obligation to
investigate every match but the decision to restrict investigations must be risk based.
The NFI Website provides risk scoring against matches which allows Resources to
prioritise high risk matches for investigation. Internal Audit also liaised with External
Audit to ensure that they were satisfied with the approach that had been taken. 
4.4. It was originally intended that the Council would investigate 3,151 matches plus 7,209
SPD matches (total 10,360), however, as additional matches were received, these
targets were revised.  This resulted in an amended target of 10,676 which was agreed
with External Audit (see Appendix 3).  A further 74 matches were investigated out-with
this target number which included responding to enquiries from other
authorities/organisations. 
4.5. Separate to the NFI data-matching exercise, Benefits and Revenue use an external
contractor, Datatank, to undertake rolling reviews around SPD eligibility.  In previous
exercises, reliance was placed on the ongoing work of Datatank given that there was
a significant duplication with the matches being generated by the NFI exercise.  During
the 2022 exercise, however, a gap in this contract (that has now been addressed)
resulted in a higher number of matches being identified by the NFI exercise that had
not been captured by a Datatank review.  This has resulted in higher SPD NFI
outcomes than the previous exercise. 
4.6. As the Housing Benefit Fraud team has transferred to the DWP Fraud and Error
Service (FES), although initial NFI investigations are undertaken by the Council, if this
indicates a potential benefit fraud, the case is passed to FES. Matches are closed on
the NFI website as “passed to DWP”.  Any outcome, after investigation, is treated in
the same way as any other overpayment/fraud and reflected within the fraud statistics
reported to RASC on a six-monthly basis. 
4.7. A total of 317 recoverable fraud and errors have been detected through the current
NFI exercise, with an (actual) amount to be recovered of £107,116: 
Area No of fraud/errors Amount
Housing Benefit 3 7,514
CTRS 21 15,829
Creditors 6 1,182 
1 In relation to Council Tax Reduction Scheme, Housing Tenants and Council Tax Single 
Person Discount.  One further match category within “Small Business Bonus Scheme” was 
issued in May 2024 and will be reported in the 2024 NFI exercise. 
72

Page 73

Area No of fraud/errors Amount
SPD 256 82,591
Blue Badges 31 0
TOTAL  317 107,116 
A more detailed summary of outcomes is included at Appendix 3.   
4.8. Overall outcomes reduced by 32.2% from the 2020 to the 2022 Exercise.  A
comparison of the 2022 exercise outcomes to that of the previous exercise in 2020 is
included at Appendix 4. 
4.9. The next NFI exercise is due to commence in Autumn 2024. It is anticipated that 2024
matches will be issued around January 2025.  The timetable for this exercise is shown
at Appendix 5.  Internal Audit are liaising with Services around the provision of data
and Executive Directors have been advised that the 2024 Exercise is commencing.     
5. Audit Scotland NFI 2022 Report
5.1. At the conclusion of each main NFI exercise, Audit Scotland publish an overview report
that sets out NFI outcomes across Scotland, draws conclusions from these results and
makes recommendations for consideration ahead of participation in the next NFI
exercise. A copy of the full Audit Scotland report can be found here. 
5.2. 110 public sector bodies in Scotland participated in the 2022 NFI exercise, submitting
data and following up on matches.  The Scottish Government also submitted data for
another 17 central government bodies who share their systems for payroll and/or
creditors. Many councils also submit payroll data for their Arm’s-Length External
Organisations. Across the UK, 1,100 bodies participated in the 2022 Exercise. 
5.3. The 2022 Exercise matched data from His Majesty’s Revenue and Customs (HMRC)
using powers under the Digital Economy Act (2017) for the first time. Non-Domestic
Rates Small Business Bonus Scheme (NDR SBBS) matching was postponed due to
the national NDR revaluation exercise taking place in 2023.  This will now be included
in the 2024 Exercise. 
5.4. Audit Scotland have reported that the overall outcomes from the 2022 NFI exercise
have increased from £14.9m in 2020 to £21.5m in 2022. Most outcomes (fraud,
overpayment or error) related to council tax, pensions and housing benefit.  The figure
reported by Audit Scotland consists of three elements; actual savings identified by the
NFI Exercise; an estimated forward saving and an estimated notional loss.  The
£21.5m reported by Audit Scotland is broken down as follows:  
Outcome Category Description Amount
(£m)
actual  actual overpayment and additional income identified
by the Exercise
5.714
forward estimates  estimated value of any future losses that may have
been incurred without intervention as a result of an
NFI match
8.924
notional estimates  estimated value of loss from a fraud or error detected
because of an NFI match, in instances where no
monetary value can be recovered 
6.839
TOTAL 21.477 
Appendix 6 sets out the estimation bases for each category. 
73

Page 74

5.5. Audit Scotland attributed an increase in outcomes reported for the 2022 Exercise partly
to an improvement in recording of results as bodies continued to recover from Covid-
19 but, also, to changes in estimation methodologies. The report noted that it was not
possible to extrapolate from these figures that underlying levels of fraud had increased. 
5.6. A detailed analysis of the outcomes across Scotland are set out in Audit Scotland’s
report and are summarised across the various data areas in the table below: 
5.7. Audit Scotland reported that although governance and follow-up arrangements remain
sound for most of the bodies in Scotland that participated in the 2022 Exercise, several
had struggled with delivery and there remained scope for improvement. The Auditor
ranked the delivery as ‘satisfactory’, ‘mostly adequate’ and ‘unsatisfactory’ and
reported that good delivery required leadership, knowledge and resources. South
Lanarkshire were ranked by Audit Scotland as ‘satisfactory’ in managing the 2022
Exercise. 
5.8. Within the report, Audit Scotland made 3 recommendations for participating bodies:- 
 ensure that an appropriate level of resource is available to deliver NFI follow-up
activities in an efficient and effective manner, in line with local priorities
 use the NFI Self-Appraisal Checklist as part of planning for the 2024/25 exercise
 put in place arrangements for monitoring follow-up activity, and where it is
necessary, seek to understand reasons for low or nil outcomes. 
5.9. All three recommendations are acknowledged by SLC and had already been
implemented. A copy of the completed self-appraisal checklist for the 2024 Exercise
is attached at Appendix 7.   Part A is designed to assist audit committee members
when reviewing, seeking assurance over or challenging the effectiveness of their 
2 This is the notional rather than actual loss attributed to the fraudulent misuse of blue badges. 
Scotland
Data Number Outcome
(£m)
Council Tax SPD 3,419 4.487
Pensions Not disclosed 5.612
Concessionary Travel 1,075 1.673
Housing Benefits Not disclosed 2.197
Blue Badges 5,140 3.3412
Housing Tenancy 11 0.876
Housing Waiting Lists 280 1.199
Creditors 146 0.751
Council Tax Reduction 395 0.916
Payroll 12 0.101
Other (including NRD previous outcomes not reported)  Not disclosed 0.324
TOTAL   21.477
74

Page 75

body’s participation in the NFI. Part B is for employees involved in planning and
managing the NFI exercise.  In addition, Audit Scotland’s report sets out suggestions
for improving efficiencies and effectiveness and the associated checklist for this is
attached at Appendix 8. 
6. Employee Implications
6.1. One Audit Assistant (with overview and management from an Audit Adviser) has been
responsible for co-ordinating the SLC exercise which has included facilitating the issue
and receipt of information requests from other public bodies in relation to NFI cases,
assisting with the recording of some or all Creditor, Procurement, Grants and Single
Person Discount investigation outcomes and reporting on employee benefit fraud
cases if required. In addition to the time required by Resources to investigate matches,
a total of 108 days was used by Internal Audit in 2023/2024 to undertake the tasks
listed. 
7. Financial Implications
7.1 Other than employee time, there is no direct cost associated with participating in the
NFI exercise. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. Fraud Risk is recognised as one of the top risks facing SLC.  This risk is significant as
it can adversely affect the delivery of Council objectives and erode valuable resources. 
It is, therefore, important that the risk of fraud is soundly managed. 
9.2. The NFI exercise is a valuable counter fraud exercise which has continued to identify
fraud and error within the Council.  As well as the quantifiable financial return from
participating in the Exercise, it is also recognised that the Council’s participation in the
Exercise will continue to act as a deterrent to fraud. 
9.3. When a fraud or overpayment occurs, steps will usually be taken to recover the loss.
Services are expected to examine why the loss occurred and demonstrate a change
in their processes and procedures accordingly.    
9.4. There are no sustainability issues associated with the content of this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. As the risks associated with the NFI are carried by the Cabinet Office and the Council
is bound by statute to participate, there is no need to undertake a separate equality
impact assessment. 
10.2. SLC Employees and South Lanarkshire residents are informed of the commencement
of the NFI exercise through a variety of sources.  There is no requirement to undertake
any further consultation in terms of the content of this report. 
Jackie Taylor
Executive Director Finance and Corporate Resources 
6 September 2024  
75

Page 76

Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent 
Previous References
 2022 National Fraud Initiative Exercise, RASC, 27 June 2023 
List of Background Papers
 NFI – The National Fraud Initiative in Scotland 2022 (Audit Scotland, August 2024) 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Yvonne Douglas, Audit and Compliance Manager
Ext:  2618 (Tel:  01698 452618)
E-mail:  yvonne.douglas@southlanarkshire.gov.uk 
76

Page 77

Appendix 1 
List of “matched” areas in the 2022 NFI Exercise     
Match area Match between Purpose of Match/Fraud risk
Housing
Benefits (HB) 
HB to Student Loans  To identify individuals claiming benefits, whose
student loan eligibility results in them being
ineligible for those benefits. 
HB to HB (within SLC
and between other
authorities)
To identify an individual that is claiming housing
benefit from one or more local authority at the same
time. 
HB to Housing Tenants
(within SLC and
between other
authorities)
To identify possible tenancy fraud and/or housing
benefit fraud where an individual appears to be
resident at two different addresses. 
HB to taxi drivers (within
SLC and between
bodies) 
To identify where housing benefit claimants have
failed to declare income that may remove
entitlement to benefit or reduce benefit payable.
HB to CTRS To identify anyone claiming housing benefit and
council tax reduction from one or more local
authority at the same time.
HB to DWP Deceased To identify where a claimant has passed away and
who was in receipt of DWP benefits which would not
have stopped
HB to Waiting List To identify where an individual appears to be
resident at two different addresses as the address
on the waiting list application is different to the
address on the benefit system
Council Tax
Reduction
Scheme
(CTRS)
CTRS to Payroll (within
SLC and between other
bodies) 
To identify where CTRS claimants have failed to
declare income that may remove entitlement to
benefit or reduce benefit payable. 
CTRS to pensions  To identify where CTRS claimants have failed to
declare pension income that might remove
entitlement to benefit or reduce benefit payable. 
CTRS to CTRS (within
SLC and between other
authorities)
To identify an individual claiming CTRS from one or
more local authority. 
CTRS to HB (within SLC
and between other
authorities) 
To identify where an individual is in receipt of
council tax reduction and housing benefit from one
or more local authority simultaneously that may
remove or reduce entitlement to the reduction.
CTRS to Housing
Tenants (within SLC and
between other
authorities) 
To identify possible cases of tenancy fraud and/or
CTRS fraud where an individual appears to be
resident at two different addresses.
CTRS to taxi
drivers(within SLC and
between bodies)
To identify where CTRS claimants have failed to
declare income that may remove entitlement to
benefit or reduce benefit payable.
CTR Scheme to DWP
deceased
To identify where a person has passed away but
may be in receipt of CTR after the date of death
77

Page 78

CTR Scheme to HMRC To identify where CTRS claimants have been
matched to household income and property
owned.
Payroll Payroll to payroll (within
SLC and between
bodies) 
To identify individuals who may be committing
employment fraud by failing to work their contracted
hours because they are employed elsewhere or are
taking long-term sickness absence from one
employer and working for another employer at the
same time. 
Payroll to Creditors To identify employees who are also creditors where
there may be a conflict of interests or corruption. 
Payroll to Pensions To identify employees who have gone back into
employment after drawing a pension that could
result in an abatement of pension. 
Housing
Tenants (HT)
HT (within SLC and
between bodies) 
To identify where an individual appears to be
resident at two different addresses suggesting
possible cases of subletting or dual tenancies.
HT to HB To identify possible cases of tenancy fraud and/or
housing benefit fraud, where an individual appears
to be resident at two different addresses.
HT to CTR Scheme To identify possible causes of tenancy fraud and/or
incorrect claims for CTR where an individual
appears to be resident at two different addresses.
HT to State Benefits To identify possible cases of tenancy fraud against
the organisation i.e. where an individual appears to
be resident at two different addresses.
HT to DWP Deceased To Identify where the tenant has died, but the DWP
has not been informed.
HT to HMRC To identify where a local authority tenant also
owns a property and may not have been given a
tenancy.
Waiting Lists Housing Waiting Lists to
Housing Tenants (within
SLC and between
bodies)
To identify where an individual appears to have
registered on the waiting list using a different
address to the one on the housing rents system
suggesting possible undisclosed changes in
circumstances or that false information has been
provided.
Housing Waiting List to
Housing Waiting List
(within SLC and
between bodies)
To identify where an individual appears to have
registered on the waiting list using two different
addresses.
Housing Waiting Lists to
Housing Benefit
Claimants (within SLC
and between bodies)
To identify where an individual appears to have
registered on the waiting list using a different
address to the one on the housing benefit system.
Waiting List to DWP
deceased
To identify an applicant who has died but is still
shown on the waiting list.
Blue Badges Blue badge to blue
badge 
To identify individuals who hold more than one Blue
Badge. 
Blue badge to DWP
deceased person
To identify cases where a permit holder has died,
but the local authority may not have been notified. 
Procurement Procurement – payroll to
Companies House
(Director)
To identify potential undeclared interests that have
given a pecuniary advantage.
Creditors Duplicate creditors by
Duplicate creditor
payments and details
To identify instances where the same supplier has
been recorded against more than one reference
number on the system thus increasing the potential
for creditors to obscure fraudulent activity.
78

Page 79

To identify possible duplicate payments.
VAT overpaid  This test identifies instances where VAT may have
been overpaid. 
Council Tax
Single Person
Discount
Council Tax to Electoral
register
To identify where Single Persons Discount is being
claimed and there is more than one person aged 18
or over registered within the property on the
Electoral Register. 
Single Person discount
award to other
government bodies
To identify individuals who have declared they are
living alone but have not declared they are living
with a partner or non-dependant in the household. 
Single Person
discount to HMRC
To identify individuals in receipt of SPD and
who may have another person in the property
based on HMRC information
SBBS
[Outcomes to
be reported in
2024 Exercise]
Business Rates to
Business Rates, same
bank account, company
name (within SLC and
between bodies)
To identify those claiming multiple Small Business
Bonus Scheme grants, those fraudulently in receipt
of SBBS. 
New match areas are highlighted in bold. 
79

Page 80

Appendix 2 
Update to matches previously reported       
Area/Matches Matches Reported
to RASC June 2023
Additional
Matches
Final Number
of Matches
Housing Benefits 135 2 137
CTRS 1,272 591 1,863
Payroll 159 1 160
Housing Tenants 488 1,308 1,796
Waiting List 1,257 11 1,268
Blue Badge 1,339 0 1,339
Creditors 4,488 0 4,488
Procurement 202 0 202
Single Person Discount 16,686 62 16,748
SBBS * 0 n/a n/a
National Entitlement Cards  0 89 89
Overall matches 26,026 2,064 28,090 
* To be reported in 2024 exercise
80

Page 81

Appendix 3 
Target Investigations and Actual Outcomes             
Area Total Original
Target
Additional
Target
Revised
Target
Cleared Fraud and
Errors
Value
£
Housing Benefits 137 128 2 130 130 3 7,514
CTRS 1,863 265 147 412 412 21 15,829
Payroll 160 143 1 144 144 0 0
Housing Tenants 1,796 377 70 447 447 0 0
Waiting List 1,268 272 11 283 283 0 0
Blue Badge  1,339 1,339 0 1,339 1,339 31 0
Creditor 4,488 425 0 425 425 6 1,182
Procurement 202 202 0 202 202 0 0
Single Persons Discount  16,748 7,209 62 7,271 7,271 256 82,591
SBBS n/a n/a n/a n/a n/a n/a n/a
Total 28,001 10,360 293 10,653 10,653 317 107,116 
National Entitlement Cards (note 1) 89 23 0 23 23 0 0 
Revised Total  28,090 10,383 293 10,676 10,676 317 107,116 
Note 1: A further match was released in January 2024 in relation to National Entitlement Cards to DWP deceased persons.  This was co-
ordinated by Dundee City Council who manage the scheme.   
81

Page 82

Appendix 4 
Comparison of Outcomes to last NFI Exercise     
Area Value (2022)
£
Value (2020)
£
Housing Benefits 7,514 18,041
CTRS 15,829 6,382
Creditors 1,182 5,676
Single Persons Discount (note 1) 82,591 30,247
Grants (SBGF and RHLG) n/a 25,000
SBBS n/a 72,658
Total 107,116 158,004 
Blue Badges (note 2)  20,150 247,250 
Note 1: During the 2022 exercise, however, a gap in service delivery under this contract, resulted
in a higher number of matches being identified by the NFI exercise that had not previously been
captured by a Datatank review.  This has resulted in higher SPD outcomes than the previous
exercise. 
Note 2: This represents a notional loss of income of £650/blue badge (attributed by the Cabinet
Office) due to fraud.  A significant reduction in an admin backlog reduced outcomes in this area in
2022 compared to 2020. 
82

Page 83

Appendix 5 
Timetable for 2024 NFI Exercise 
Date Description
April 2024 Draft Specification will be available for extracts/uploads
July 2024 SROs will be sent email requesting data with a link to the final
specifications
June/July 24 The 2024/25 area within the website will be available to: 
• Update user details /check for access
• Check the expected datasets list is up to date and advise the NFI
team of any changes
• Review the Security Compliance
• Review and complete the 2024/25 Privacy Notice declaration 
Aug 24 (and as and when future changes occur) 
Key Contacts should ensure the person responsible for uploading data has
a user account on the web application 
The end of September is also the date by which time the Privacy Notice
declaration should be completed.
End Sept 24 Key contacts should ensure that data is extracted from systems as at the
date stated on the data specification, and quality is checked, prior to
upload.  Ensure all fields are recorded even if blank.
Begin. Oct. 24 Data should be uploaded promptly after extraction via the 2024/25 Data
File Upload tool.
End Oct. 24 This will be the cut off for the dataset to make it into the main 2024/25
release.  Check published timetable for the exact cut-off date. Late data
may miss release and occur a fee.
Dec 24 (and as when future changes occur) 
Key contacts should ensure accounts are set up on the web application for
those in their organisation responsible for reviewing matches. 
83

Page 84

Appendix 6 
Summary of methodologies in calculations applied to NFI datasets 
Data Match  Basis of calculation of forward savings and
estimated outcomes 
Council Tax Single Person Discount  Forward savings – Annual value of the discount
cancelled multiplied by two years. 
Council Tax Reduction Scheme  Forward savings – Weekly change in council tax
discount multiplied by 33 weeks (increased from 21
weeks in 2020/21). 
Housing Benefit  Forward savings – Weekly benefit reduction multiplied
by 21 weeks. 
Pensions  Forward savings – Annual pension multiplied by the
number of years until the pensioner would have
reached the age of 85. 
Housing Tenancy  Notional outcomes – £78,300 per property recovered,
based on average four–year fraudulent tenancy.
Includes: temporary accommodation for genuine
applicants; legal costs to recover property; re–let cost;
and rent foregone during the void period between
tenancies (reduced from £93,000 in 2020/21). 
Housing Waiting Lists  Notional outcomes – £4,283 for each case based on
the annual estimated cost of housing a family in
temporary accommodation, the duration a fraud may
continue undetected and the likelihood a waiting list
applicant would be provided a property (increased from
£3,240 in 2020/21). 
Blue Badges  Notional outcomes – Number of badge holders
confirmed as having died multiplied by £650 to reflect
lost parking and congestion charge revenue (increased
from £575 in 2020/21). 
Concessionary Bus Travel  Forward savings – Number of bus passes used
fraudulently multiplied by £420. Based on average
fraudulent use and reflecting two years forward use. 
Payroll  Notional outcomes – £5,685 for each employee
dismissed or resigns as a result of NFI matching. (up
from £5000 in 2020/21). 
84

Page 85

Appendix 7 
NFI Checklist 2022/2023 
Part A:
For those charged
with Governance
Yes/No/Partly Is Action
Required
Who by
and when?
Leadership, commitment and communication
1. Are we aware of
emerging fraud risks
and taken
appropriate
preventative and
detective action? 
Yes.  Internal Audit regularly review the
emerging fraud risks and update the Audit
Plan accordingly.  In addition, Fraud Risk
Registers are in place for each Resource
and reviewed annually, overseen by
Internal Audit. The Risk Management
Service continually update the Council’s
Top Risks and discuss risks with
representatives of each Resource.
No n/a
2. Are we committed
to NFI? Has the
council/board, audit
committee and
senior management
expressed support
for the exercise and
has this been
communicated to
relevant staff? 
Yes. South Lanarkshire Council has
participated in NFI exercises since 2004.
Support through Risk and Audit Scrutiny
Committee evidenced through allocation of
employees across Resources to
participate in exercise. Employees and
Members are made aware of the exercise
through intranet and internet notices and
Personnel Circulars.
No n/a
3. Is the NFI an
integral part of our
corporate policies
and strategies for
preventing and
detecting fraud and
error? 
Yes.  The NFI exercise is outlined in the
Council’s Anti-Fraud, Bribery and
Corruption Policy and also included in
other council policies.
No n/a
4. Have we
considered using the
point of application
data matching
service offered by
the NFI team
(AppCheck), to
enhance assurances
over internal
controls and
improve our
approach to risk
management? 
Yes.  This has been reviewed but is not
being utilised in 2024/2025.
No n/a
85

Page 86

5. Are NFI progress
and outcomes
reported regularly to
senior management
and elected/board
members (e.g., the
audit committee or
equivalent)? 
Yes. Included in six-monthly Fraud
Statistics reports to the Risk and Audit
Scrutiny Committee.
No n/a
6. Where we have
not submitted data
or used the matches
returned to us (e.g.
council tax single
person discounts),
are we satisfied that
alternative fraud
detection
arrangements are in
place and that we
know how
successful they are? 
Yes.  SLC submits all data sets to allow
matches to be carried out.  When matches
are returned, a decision is then taken on
the a target number of investigations to be
undertaken. The target number of
investigations agreed is risk-assessed
based on the results of previous NFI
exercise, the control environment and
existing ongoing reviews in the area.
Where other fraud detection arrangements
are in place, these continue and are
reviewed in conjunction with NFI data (e.g.
external company used to assist with
investigating SPD matches).
No n/a
7. Does internal
audit, or equivalent,
monitor our
approach to NFI and
our main outcomes,
ensuring that any
weaknesses are
addressed in
relevant cases? 
Yes. Internal Audit manage and monitor
the NFI exercise for the Council.  This
includes any output from Audit Scotland
who are contacted should any issues arise
during the exercise.
No n/a
8. Do we review how
frauds and errors
arose and use this
information to
improve our internal
controls? 
Yes.  All matches are investigated by the
relevant Service.  Learning points are used
to improve controls.
No n/a
9. Do we publish, as
a deterrent,
internally and
externally the
achievements of our
fraud investigators
(eg, successful
prosecutions)? 
No. SLC do not have fraud investigators. 
Internal Audit and Personnel Services
undertake any internal fraud related
interviews and report to Police Scotland if
appropriate.
No n/a
86

Page 87

Part B:
For NFI Key
Contacts and users
Yes/No/Partly Is Action
Required
Who by
and when?
Planning and Preparation
1. Are we aware of
emerging fraud risks
and taken
appropriate
preventative and
detective action? 
Yes.  Internal Audit are aware of emerging
risks and ensure matches in relation to
these are fully investigated.
No n/a
2. Are we investing
sufficient resources
in the NFI exercise? 
Yes. Internal Audit co-ordinate, monitor
and report on the NFI exercise. Time is
allocated within the Internal Audit Plan
each year. Resources nominate
employees and allocate time to allow
matches to be investigated.
No n/a
3. Do we plan
properly for NFI
exercises, both
before submitting
data and prior to
matches becoming
available? This
includes considering
the quality of data. 
Yes.  SLC has written their own
procedures and guidance for the exercise
covering the whole process.  Prior to
uploading data, checks are undertaken to
ensure extracts comply with specifications
and are cleansed. Once submitted,
Internal Audit ensure that the people
responsible for match investigations are
trained in the processes and have read all
the privacy and security guidance.
No n/a
4. Is our NFI Key
Contact the
appropriate officer
for that role and do
they oversee the
exercise properly?
Are our Key
Contact’s details up
to date on the NFI
system? 
Yes.  The key contacts for the exercise are
fully involved in the whole exercise.  They
are involved in identifying the matches to
be reviewed and monitoring output and
outcomes on a regular basis.  They are
available to Users for any assistance or
queries they may have. Key contact details
are correct on the NFI system.
No n/a
5. Does our Key
Contact have the
time to devote to the
exercise and
sufficient authority to
seek action across
the organisation? 
Yes.  Time has been allocated in the Audit
Plan to undertake the NFI work.  One
Audit Assistant manages the exercise
overseen by an Audit Adviser.  The Audit
and Compliance Manager and Audit
Adviser, who are both key contacts, have
adequate authority to take action across
the organisation should it be required.
No n/a
6.  Where NFI
outcomes have
been low in the past,
do we recognise that
this may not be the
case the next time,
that NFI can deter
fraud and that there
is value in the
assurances that we
Yes.  SLC review matches based on the
high risk score, high fraud, key reports and
also previous outcomes regardless of their
value.  
No n/a
87

Page 88

can take from low
outcomes? 
7. Do we confirm
promptly (using the
online facility on the
secure website) that
we have met the fair
processing notice
requirements? 
Yes.  No n/a
8. Do we plan to
provide all NFI data
on time using the
secure data file
upload facility
properly? 
Yes.  SLC is aware of the timescales for
the NFI exercise and always ensure
compliance.
No n/a
9. Have we
considered using the
point of application
data matching
service offered by
the NFI team
(AppCheck) to
enhance assurances
over internal
controls and
improve our
approach to risk
management? 
Yes.  This has been reviewed but is not
being utilised in 2024/2025.
No n/a
Effective Follow-up of Matches
10. Do all
departments
involved in NFI start
the follow-up of
matches promptly
after they become
available? 
Yes.  Departments start their
investigations as soon as Internal Audit
issue their target matches to them.
No n/a
11. Do we give
priority to following
up high-risk
matches, those that
become quickly out-
of-date and those
that could cause
reputational damage
if a fraud is not
stopped quickly? 
Yes.  All high risk matches are
investigated by SLC.  Departments are
aware of the highest risks for their service
area and prioritise appropriately.  Discuss
and confirm approach with External Audit.
No n/a
12. Are we
investigating the
circumstances of
matches adequately
before reaching a
‘no issue’ outcome,
in particular? 
Yes.  All Departments involved in the NFI
exercise have expertise in their field and
carry out adequate investigations.
No n/a
88

Page 89

13. (In health
bodies) Are we
drawing
appropriately on the
help and expertise
available from NHS
Scotland Counter
Fraud Services? 
n/a No n/a
14. Are we taking
appropriate action in
cases where fraud is
alleged (whether
disciplinary action,
penalties/cautions or
reporting to the
Procurator Fiscal)?
Are we recovering
funds effectively? 
Yes. Fraud is investigated in accordance
with standard procedures. Disciplinary
action is considered where appropriate.
Recovery procedures are in place.
No n/a
15. Do we avoid
deploying excessive
resources on match
reports where early
work (e.g., on high-
risk matches) has
not found any fraud
or error? 
Yes. This is analysed on a risk-basis and
targets set dependant on a number of
factors, including number of matches,
fraud area, previous outcomes and
resources.
No n/a
16. Where the
number of high-risk
matches is very low,
are we adequately
considering the
medium and low-risk
matches before we
cease our follow-up
work? 
Yes. This is analysed on a risk-basis and
targets set dependant on a number of
factors, including number of matches,
fraud area, previous outcomes and
resources.
No n/a
17. Do we follow up
matches which
indicate a customer
may be eligible for a
benefit or service
which they currently
do not receive? 
Yes, claimant would be contacted to
advise they may be entitled to a particular
benefit (similar to standard process to
advise claimants should there be a
potential entitlement to another benefit). 
18. Overall, are we
deploying
appropriate
resources on
managing the NFI
exercise? 
Yes. Internal Audit co-ordinate, monitor
and report on the NFI exercise. Time is
allocated within the Internal Audit Plan
each year. Resources nominate
employees and allocate time to allow
matches to be investigated.
No n/a
Recording and Reporting
19. Are we recording
outcomes properly
in the secure
website and keeping
it up to date? 
Partly.  It was identified during the 2022
exercise that some outcomes were not
recorded correctly and had to be
amended. 
Yes.  During
training,
Internal
Audit will go
over what
each
Key Contact
89

Page 90

outcome
means and
when it
should be
used.  This
has also
been added
to the
guidance.
20. Do staff use the
online training
modules and
guidance on the
secure website, and
do they consult the
Cabinet Office NFI
team if they are
unsure about how to
record outcomes (to
be encouraged)? 
Partly.  SLC has produced their own
guidance on accessing the website and
recording match outcomes.  Access to
online training is also available, if required,
along with the NFI helpdesk.
Yes.  New
users would
be
encouraged
to access
the online
modules in
addition to
SLC’s
guidance.
Key Contact
21. If, out of
preference, we
record some or all
outcomes outside
the secure website,
have we made
arrangements to
inform the Cabinet
Office NFI team
about these
outcomes? 
No.  SLC do not record the outcomes for
NFI matches elsewhere.  All outcomes are
recorded on the NFI system.  Where a
third party identified an outcome
previously, it would be recorded as
“Already Known”.
No n/a
90

Page 91

Appendix 8
Audit Scotland checks as to how to work more efficiently  
(actions to be taken are noted in bold) 
Efficient Working Practice Action Required?
Ensure staff involved in the NFI keep up to
date with new features of the web application
and good practice, by reading the guidance
notes and watching the online training
modules before they begin work on the
matches.
Yes. All NFI users will be directed to
complete refresher training where required
ahead of the 2024 NFI exercise. 
Key Contacts should schedule staff resources
so that time critical matches, such as housing
benefit to students, can be dealt with as soon
as they are received.
Instructions around this are already included in
the NFI Plan and conveyed to Resources.
Key Contacts should coordinate investigations
across internal departments and, eg organise
joint investigation of single person discount
matches involving housing benefit, to ensure
all relevant issues are actioned.
Internal Audit fulfil this role and no amendment
to approach is required.
Use the tools within the web application, such
as the filter and sort options or data analysis
software, to help prioritise matches that you
deem the highest risk. You should also look
back to see which reports in a previous
exercise gave you outcomes. This will save
time and free up staff for the most important
investigations
Internal Audit utilise this tool and no amendment
to approach is required.
The web application shows the number of
shared comments which require a response
(Outstanding Actions). These responses
should be prioritised if they relate to an
ongoing investigation so that it can be
progressed promptly.
Internal Audit regularly review the shared
comments/outstanding actions and notify
Resources of those that need a response.  This
practice will continue.
Review the quality of the data supplied before
the next exercise as external providers
normally have to phase in changes to
extraction processes. Better data quality will
improve the quality of resulting matches.
Data has been reviewed for the next exercise. 
Develop capability and capacity to punish
fraudsters, ensuring that investigations are not
abandoned if the individual resigns, leaves the
property etc. Seek, through collaborating with
law enforcement and the courts, the recovery
of defrauded funds.
South Lanarkshire Council will continue to
pursue outcomes in compliance with fraud
policies. 
91

Page 92

92

Page 93

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 24 September 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Financial Resilience and Sustainability 
1. Purpose of Report  
1.1. The purpose of the report is to: 
 provide a position on the Council’s Financial Outlook, financial resilience and
sustainability, and how we can respond to the risks posed by the financial
challenges ahead 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): 
(1) that the Financial Position and Plan for 2025/2026 to 2027/2028 (section 4), be
noted; and
(2) that the Financial Resilience Framework (section 5 and Appendix 1), be noted. 
3. Background
3.1. A report was presented to the Council’s Executive Committee on 26 June 2024
detailing the 2025/2026 to 2027/2028 Revenue Budget Strategy.   
3.2. Section 8 of the June 2024 Revenue Budget Strategy report noted that the Chartered
Institute of Finance and Public Accountancy (CIPFA) introduced a Financial
Management Code (the FM Code) for implementation by 31 March 2021.  The FM
Code provides “guidance for good and sustainable financial management in local
authorities. By complying with the principles and standards within the code, authorities
will be able to demonstrate their financial sustainability”. A key goal of the FM Code is
to improve and evidence the financial resilience of organisations by embedding
enhanced standards of financial management. 
3.3. In the Annual Audit Report for 2023/2024, it was acknowledged that given the scale of
the challenges there is an opportunity to enhance focus on financial resilience,
including greater emphasis on reserves, clear financial resilience indicators and
measures, and alignment to risks ensuring there is a clear financial strategy to support
a resilient council. 
3.4. Through consideration of the level of reserves, and the financial planning and
management shown in the medium-term Budget Strategy presented in June 2024, the
Council already demonstrates it has an understanding of the Budget pressures it faces
and that it mitigates as far as possible against unforeseen costs and pressures.   
3.5. The Budget Strategy noted that a further report would be brought to the Risk and Audit
Scrutiny Committee which would provide further information on the Council’s
resilience.  
7
93

Page 94

3.6. This report will, therefore, provide a summary of the 2025/2026 to 2027/2028 Budget
Strategy reported in June demonstrating the Council’s understanding of the medium-
term financial outlook (section 4) and section 5 will provide information on the Council’s
Financial Resilience and Sustainability. 
4. Financial Position and Plan for 2025/2026 to 2027/2028
4.1. The report to Council in June covered the current estimates and assumptions resulting
in the budget gap of £77.275 million for the next 3 years. This gap is the result of
estimations around grant levels, cost increases, and the impact of temporary solutions
previously put in place to manage pressures.  This gap did not include any assumption
around an increase in Council Tax. 
4.2. At a level of £77.275 million across the 3 years, the Budget Gap is substantial. 
Following presentation of this to the Executive Committee in June 2024, the outlook
was also presented to all members at a Budget Seminar held on 29 August 2024.  This
presentation demonstrated the enormity of the financial challenge ahead and the
medium-term financial outlook. 
4.3. The June 2024 paper highlighted that to address this Budget Gap, consideration will
be required to what services the Council can afford to continue to deliver and how
these services are provided.  Difficult decisions will need to be made to balance the
Council’s budget and we will need to significantly change what we deliver over the next
3 years with the focus being on statutory services.  There will likely be areas where we
will need do consider whether we can continue to deliver services and if so, what those
services will actually look like. 
4.4. In order to deliver a balanced budget, it is acknowledged that we need to have a
programme of change.  This will build on the work undertaken over many years, where
service reviews have taken place and which have fed into the savings options that
Members have considered.  A Transformational Change programme will drive
continuous improvement as well as efficiencies and will feed into the Budget Strategy.   
4.5. The foundation of this Transformational Change Programme will be a series of Cross-
Cutting Reviews.  These Cross-Cutting Reviews are not focussed on one Resource,
but on Council-wide activities.  A recent report to the  Performance and Review
Scrutiny Forum titled Cross-Cutting Review - Update gave members of the Forum a
list of all the cross-Resource reviews, and a brief description of what each Review will
consider.   
4.6. Most of these Cross-Cutting Reviews have already commenced and it is anticipated
that they will deliver savings across the term of this Budget Strategy, 2025/2026 to
2027/2028.   
4.7. Alongside the Cross-Cutting Reviews, Resources are considering their own Service
areas, and a programme of Reviews will also take place to inform savings for the
coming year. As these Resource Reviews progress, proposals will be presented to
Members for approval as part of the Budget setting process. 
4.8. The Executive Committee agreed in June that options to meet the budget gap would
be developed for members’ consideration and brought back to a future meeting of the
Committee. That process is ongoing and will be informed by the Cross-Cutting and
Resource Reviews.  This demonstrates a structured approach to identifying savings
proposals for members’ consideration and will assist greatly in managing the Budget
Gap.  
94

Page 95

4.9. As part of the process of managing the Council’s finances over the coming 3 years,
especially given the financial challenges that lie ahead and the Budget Gaps being
faced by the Council, consideration must be given to the Council’s position on
resilience.  More than ever, the Council needs to be able to demonstrate our strong
financial management and how we will manage financially in these difficult times.   
4.10. The importance of this is acknowledged by Audit Scotland in their Annual Audit Report
2023/2024 where they assess the Council’s position on Financial Sustainability.  They
state that Financial Sustainability means being able to meet the needs of the present
without compromising the ability of future generations to meet their own needs. 
4.11. The key messages in relation to the assessment is that the Council has effective
budget monitoring arrangements in place. They go on to state that given the financial
pressures, the Council is continuing to assess its reserves strategy and review how it
assesses, monitors and reports on its financial resilience, and that the Council
recognises the financial challenges facing the organisation. The Transformational
Change programme is underway and is key to achieving financial sustainability over
the medium to longer term.  Financial resilience is covered in the next section of this
report.   
5. Financial Resilience
5.1. It is acknowledged that financial resilience is a crucial aspect of financial management
and is particularly important in light of the financial pressures facing local government
especially following years of inflationary cost increases.  It is recognised that this is
about more than the reliance on usable reserves, and that councils need to be more
comprehensive in their assessment of their level of financial resilience. 
5.2. This paper will detail how councils can demonstrate financial resilience, by explaining
key aspects of financial strength as well as highlighting the areas that should continue
to be monitored or examined further.   
5.3. The financial resilience of the Council looks at its ability to anticipate and respond to
changes in the internal and external financial environment.  In order to do that, it is
important to know what resources are available in a time of crisis, and not just
reserves.  It is also important to understand the Council’s exposure to loss of income,
your level of commitment to expenditure, and to know what flexibility the Council has
in terms of accessing funds when they are required.  Appendix 1 provides a framework
which looks at:- 
 A Review of the Balance Sheet (Appendix 1, sections 4 to 17 including Council
Reserves and Liquidity, Debt and Investment)
 Exposure to Risk (Appendix 1, sections 18 to 23 including Significant Income
Areas, Top Expenditure Commitments and Group Risk) 
5.4. A summary of the Council’s performance in terms of the Financial Sustainability
element of the Local Government Benchmarks is also included in Appendix 1 (sections
24 to 30) for consideration. 
5.5. As with any set of indicators, there is not necessarily a right or a wrong answer.  It is
more important that they are used to provide financial context, and it may be that the
trend in these figures over a number of years is more of an indicator for action as on
an annual basis only, an issue might not be visible or may be overlooked.  These
indicators will continue to be monitored across time and we will report these to the Risk
and Audit Scrutiny Committee on an annual basis.
95

Page 96

5.6. Summary of Financial Resilience Framework:  The financial resilience framework
demonstrates the level of the Council’s financial resilience in a number of ways.  The
Council holds an uncommitted General Fund Reserve to protect against unforeseen
events.  This sits alongside a level of earmarked reserves which can be used in a
managed way to smooth the impact of pressures across years – for example the Loans
Fund Review, Service Concessions and the reduced Pension Fund Contributions. 
This aligns to the Council’s medium term financial strategy which has been approved
by members and demonstrates good financial management through planning and
managing key budget pressures.   
5.7. The framework shows that the level of debt costs compared to the net income for the
Council has reduced on the previous year.  An important point to note that these debts
costs are the result of the planned borrowing undertaken by the Council and that the
debt repayments are considered affordable as part of our revenue budget. 
5.8. As well as looking at what resources are available in times of crisis, the financial
resilience of the Council also looks at its ability to anticipate and respond to changes
in the internal and external financial environment.  In order to do that, it is important to
understand the Council’s exposure to loss of income and key areas of budget
pressure.   The financial resilience framework details the significant income areas and
also the areas of high spend / high risk that the Council acknowledges and will continue
to monitor. 
5.9. The Council participates in the Local Government Benchmarking Framework in
relation to assessing sustainability. The Improvement Service note that a direct
comparison cannot be drawn due to the nuances of individual councils and their own
financial plans.  However, reviewing the trend in the Council’s position over time will
give context.  From the Council’s own perspective, analysis of the ratios demonstrates
the level of reserves held by the Council was lower than the Scottish average, as is
the unearmarked element.  However, at a value of £13.043 million, this is deemed an
appropriate level but will continue to be monitored.  The sustainability indicators also
note that the Council finished its year end in a break-even outturn position which is a
positive outturn. 
5.10. This paper demonstrates the Council’s financial resilience by explaining its detailed
financial planning, its level of reserves and its key financial strengths in term of its
balance sheet position.  Any risks identified through horizon scanning are mitigated
where appropriate through the Budget Strategy, a key part of the Council’s financial
resilience framework. 
6. Employee Implications
6.1. There are no direct employee implications from this report. 
7. Financial Implications
7.1. The financial implications are summarised within the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report.   
8.2. Climate Change targets will have an impact on the Council’s future financial strategies. 
This will be included in future Budget Strategy papers as appropriate. 
9. Other Implications
96

Page 97

9.1. The review of financial resilience is a way of understanding the key financial risks to
the Council.  The financial strategy is the way in which the Council can manage a
number of these key risks which directly impact on the money available to deliver
Council outcomes.   
9.2. We will continue to monitor and report on these resilience indicators as appropriate. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
10.2. There is no requirement to undertake any consultation in terms of the information
contained in this report. 
10.3. However, as the process to identify savings continues, and with proposals to be
presented to members later in the year, stakeholder consultation and equality impact
assessments will be carried out.  The results will be provided to members to inform
their decision-making process. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
2 September 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 24 June 2024 
 Performance and Review Scrutiny Forum, 27 August 2024 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: 
Jackie Taylor, Executive Director, Finance and Corporate Resources 
Ext:  4637 (Tel:  01698 454637)
E-mail : jakie.taylor@southlanarkshire.gov.uk  
97

Page 98

Appendix 1
Financial Resilience – A Framework 
1. It is acknowledged that financial resilience is a crucial aspect of financial management,
and is particularly important in light of the financial pressures facing local government
especially following years of inflationary increases in costs.  It is recognised that this is
about more than the reliance on usable reserves, and that councils need to be more
comprehensive in their assessment of their level of financial resilience. 
2. This paper will detail how councils can demonstrate financial resilience, by explaining  key
aspects of financial strength as well as highlighting the areas that should continue to be
monitored or examined further.   
3. The financial resilience of the Council should look its ability to anticipate and respond to
changes in the internal and external financial environment.  In order to do that, it is
important to know what resources are available in a time of crisis, and not just reserves.  It
is also important to understand the Council’s exposure to loss of income, your level of
commitment to expenditure, and to know what flexibility the Council has in terms of
accessing funds when they are required.   
4. A Review of the Balance Sheet:  Taking information from the Council’s Balance Sheet
at the end of the financial year is a way to assess resilience.  Maintaining a strong balance
sheet provides the assurance that the Council can respond in the time of crisis and that it
can meet its obligations.  It is proposed that a Balance Sheet Review would consider the
following: 
• Council Reserves and Liquidity and 
• Debt and Investment. 
5. Council Reserves and Liquidity: It is the responsibility of the Executive Director
(Finance and Corporate Resources) to advise the Council on the level of reserves it
should hold and to ensure that there are clear protocols for their establishment and use. 
6. The Local Authority Accounting Panel (LAAP) provide guidance to the Council’s Section
95 Officer (the Executive Director of Finance and Corporate Resources), on the
establishment and maintenance of local authority reserves and balances. The LAAP
Bulletin does not prescribe a minimum level of reserves which should be held by a council.
It is for the Council to consider an appropriate level of reserves taking cognisance of
strategic, operational and financial risks facing the authority at a local level. It does,
however, say that Reserves should not be held without a clear purpose. Audit Scotland
have noted that the level of reserves that a council holds is a local decision but should be
clearly informed by an annually reviewed reserves policy. 
7. The Council keeps an Uncommitted General Fund Reserves to protect against the risk of
unforeseen events. This is considered best practice and demonstrates sound financial
planning.  As has been advised to members previously, the use of Reserves is not a
permanent budget solution but can be used to smooth the impact of pressures across
years – for example as we have employed with the monies released by the Loans Fund
Review, Service Concessions and the reduced Pension Contributions.  If necessary,
Reserves can be used to absorb one-off costs to avoid an impact on Resource budgets
in-year or can facilitate the rollover of unused elements of grant into the next financial
year.   
98

Page 99

8. Table 1 provides information on the level of Reserves across the past 3 years and looks
at these Reserve levels in light of total expenditure commitments.  It also looks at the ratio
of current assets to current liabilities (Liquidity) in order to determine whether the Council
could use its current assets to cover its current liabilities, if required.  
Table 1:  Reserves and Liquidity 
2023/2024 2022/2023 2021/2022
General Fund
Useable Reserves (exc. HRA) £120.382m £164.080m £135.945m
Movement in Useable Reserves (exc. HRA) (43.698m) £28.135m £2.909m
Useable Reserves / Net Revenue Stream 14.12% 19.86% 17.41%
Level of Uncommitted General Fund Reserve £13.043m £13.043m £13.043m
Level of Committed Reserves (exc. HRA) £107.339m £151.037m £122.902m
Housing Revenue Account Reserve
Useable Reserves £13.221m £12.861m £16.241m
Movement in Useable Reserves £0.360m (£3.380m) £3.457m
Useable Reserves / Net Revenue Stream 12.52% 12.67% 16.58%
Liquidity
Current Assets to Current Liabilities
£119.471m/
£277.521m
= 0.43
£225.337m/
£242.674m
= 0.93
£213.198m/
£258.841m
= 0.82 
9. Table 1 shows the movement in the Total Useable Reserves of the Council (exc. HRA)
as well as the HRA Reserve.  The level of committed reserves for the General Fund and
the HRA have both decreased across years.  At the end of 2023/2024, the General Fund
decrease reflects the use of reserves for budget strategies mainly relating to those
Generated by the Loan Fund Review and the implementation of Service Concessions. 
10. As a proportion of the Net Revenue Stream, General Fund Reserves have decreased
over time.  While the Council’s Net Revenue Stream (Council Tax and Government Grant)
has increased, there has been a reduction in useable reserves reflecting the use of
reserves for budget strategies.  This is similar for the HRA Reserve as a proportion of its
Net Revenue Stream. 
11. In terms of the Council’s liquidity position, the ideal would be that current assets exceed
current liabilities.  In 2023/2024, the ratio has dipped due to the Council no longer holding
any short-term investments.  In reality, this indicator reflects the Council’s position at a
point in time, and there are no concerns regarding the Council’s liquidity position. 
12. Debt and Investment:  The Council’s Balance Sheet provides information on Debt
(borrowing) and Investment levels.  It shows whether the Council’s liabilities are short or
long term.   
13. The Council already prepares a suite of ratios to meet the obligations of the Prudential
Framework.  The ratios that relate to Debt and Investment are provided in Table 2. 
99

Page 100

Table 2:  Debt and Investment 
2023/2024 2022/2023 2021/2022
Borrowing 1,034.532 1,036.302 993.486
PPP Liability 172.036 179.134 186.290
Gross Debt 1,206.568 1,215.436 1,179.766    
General Fund 1,102.027 1,089.036 1,015.606
HRA 307.217 292.706 282.854
Total Capital Financing Requirement 1,409.244 1,381.742 1,298.460    
Under / (Over) Borrowed 202.676 166.306 118.684    
Investments (Deposits) 13.475 160.770 132.070    
General Fund   
Financing Costs 31.249 36.921 40.487
Net Revenue Stream 852.568 826.366 780.941
Financing Charges to Net Revenue Stream 3.67% 4.47% 5.18%    
HRA   
Financing Costs 8.155 14.192 15.716
Net Revenue Stream 105.649 101.531 97.975
Financing Charges to Net Revenue Stream 7.72% 13.98% 16.04% 
14. Table 2 shows that the Council’s Gross Debt has decreased since last year reflecting
anticipated debt repayment profiles.  The Capital Financing Requirement (the level of debt
that we need to finance our assets) has increased over the 3 years and this is because
our in-year borrowing has been higher than the level of debt repayments made.   
15. Comparing the Gross Debt to the Capital Financing Requirement gives a position of under
or over borrowing.  The Council has under-borrowed.  This is a favourable position and is
because we did not need to borrow as much as predicted due to the level of cash reserves
held.  In terms of investments (deposits) – there was an obvious decrease in 2023/2024,
and this reflects the lower level of cash balances as we have used reserves in lieu of
borrowing.   
16. Finally, the ratio of debt costs to net financing stream for the General Fund and the HRA
are sitting at approximately 4% and 8% respectively.  This is a reduction on the previous
year and generally reflects the reduction in debt payments offset by the increase in
revenue income.     
17. An important point to note is that the borrowing undertaken by the council is planned and
the repayments on these debts are considered as affordable as part of our revenue budget 
18. Exposure to Risk:  A review of Revenue expenditure and income over time ensures that
we know the areas that we need to focus our attention on to ensure we can pre-empt any
potential financial pressures.  A review of the exposure to risk would look at: 
• Significant Income Areas and
• Top Expenditure Commitments     
19. Significant Income Areas:  Looking at the Council’s Budget, there are a number of
significant high value Income areas outwith the Government Grant / NNDR Income
budgets.  These are noted in Table 3 as appropriate, giving context on each. 
100

Page 101

Table 3:  Significant Income Areas 
2023/2024 2022/2023 2021/2022    
Council Tax Income 159.053 148.958 143.472
Council Tax Income as a percentage of Net Revenue
Stream
18.70% 18.03% 18.37%
Parking Income  2.031 1.867 1.503
School Meals Income  3.213 2.763 2.578
Bereavement Income  2.979 2.658 2.431
Planning and Building Standards Income 2.885 3.362 4.078
Early Years Fee Income  1.990 1.591 1.021
Licensing and Registration Income 1.503 1.793 1.472 
20. Table 3 shows that as a percentage of the Council’s Total Budget, the level of Council
Tax Income has increased into 20203/2024.  This mainly reflects increased property
numbers being added to the Council Tax list as well as an approved increase in Council
Tax Band D.  In financial terms, the level of Council Tax income received in 2023/2024 is
actually £13 million higher than the previous year – a positive position. 
21. The table also shows some significant income budgets and the pattern over recent years. 
Some of these areas (School Meals, Parking, Licensing and Registration) were
significantly affected by the pandemic and have struggled to return to pre-pandemic levels
(before 2020/2021).  They will continue to be monitored to identify whether the pressure
reduces.   
22. Top Expenditure Commitments:  Similarly, there are a number of significant Council
budget areas that can be highlighted for a trend analysis, on the basis that they are
demand lead, high value budgets and are, therefore, a risk area for the Council.  These
are noted in Table 4 which notes the actual spend and the variance across years to show
the pressure in those areas. Top expenditure commitment areas feature as part of the
Council’s considerations when looking at future budget strategies. 
Table 4:  Top Expenditure Commitments 
2023/2024 2022/2023 2021/2022 
£m £m £m
Adult and Older People Social Care 
- delegated to the IJB
182.657
(breakeven)
165.334
(breakeven)
141.338
(0.031 under)
Children and Family Services 47.160
(0.468 over)
43.749
(1.295 over)
36.145
(0.917 over)
Waste Services 
- Facilities, Streets, Waste and Grounds
82.954
(0.097 over)
75.349
(0.370 over)
70.849
(0.262 over)    
* All figures are after approved Transfers to Reserves.  
23. Table 4 shows that the spend on these areas is increasing over time.  For Children and
Families and also for Adults and Older People (albeit the services are delegated to the
Integration Joint Board (IJB)), the Services continue to manage budget pressures through 
budget planning.  In the same way as the Council, the IJB identify budget gaps, and
solutions as part of their medium-term financial planning process.  The cost of the Waste
Service (as part of the Facilities, Streets, Waste and Grounds) continues to experience
high demand and income pressures (school meals for example).  These Services will
continue to be monitored. 
24. Local Government Benchmark Framework:  From 2019/2020 onwards, the Local
Government Benchmarking Framework introduced new ratios to assess sustainability.  
101

Page 102

The 2022/2023 data is shown in Table 5.    
Table 5:  Sustainability – Local Government Benchmark Framework 
Council Scotland   
What proportion of my income does the council hold in reserves? 22% 24.5%
What proportion of my council's revenue is not committed to a
specific theme/project?
1.5% 3.2%
How much of my council's income is used to service debt? 5% 5.4%
How much of my council's housing income is used to service debt? 17.2% 22.2%
What proportion of my council's budgeted spend is spent in
practice?
100% 98.6% 
25. Table 5 shows that the Council’s results alongside the national position.  It is noted that a
direct comparison cannot be drawn due to the nuances of individual councils and their
own financial plans.  However, reviewing the trend in the Council’s position over time will
give context.  The data over years since 2013/2014 are included in the Improvement
Service website. 
26. The financial resilience framework and the Local Government Benchmarks detailed above
can be used as a basis for assessing the financial resilience of the Council. The aim of
the first indicator is to show how much money the Council holds in reserves.  At the end
of 2022/2023 the Council was lower than the Scottish average.  While the significance of
the level of reserves held is acknowledged, it must also be acknowledge that most of
these reserves are committed. 
27. In terms of the uncommitted revenue monies, that refers to the unearmarked general fund
and while it is lower than the Scottish average, at a level of £13.043 million, this is deemed
appropriate but is kept under review.   
28. The third indicator (and the fourth relation to the HRA) refers to the level of loan charges
compared to the overall budget.  Again, the General Fund loan charges are lower than
the Scottish average, and similarly for the HRA.  The relevance of this indicator is to
consider affordability.  The Council and the HRA have planned for the debt, ensuring
repayments are sustainable.         
29. Finally, the last indicator looks at the year-end position and as the Council had a break-
even position after approved transfers to reserves (the full budget is spent or committed
in year) this is a positive outturn.   
30. As with any set of indicators, there is not necessarily a right or a wrong answer.  It is more
important that they are used to provide financial context, and it may be that the trend in
these figures over a number of years is more of an indicator for action as on an annual
basis only, an issue might not be visible or may be overlooked. 
102

Page 103

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 24 September 2024 
Report by: Executive Director Finance and Corporate Resources 
Subject: Internal Audit Activity as at 30 August 2024     
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update the Risk and Audit Scrutiny Committee (RASC) on progress of the Internal
Audit service in the period 1 June to 30 August 2024 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that progress is noted. 
3. Background 
3.1. Findings from internal audit assignments are reported to the Committee throughout
the year. The last progress report to the Committee was in June 2024 and reported
on work completed in the period 9 March to 31 May 2024. This report covers all work
completed in the period 1 June to 30 August 2024.  Performance information is also
included. 
4. Delivery of the Internal Audit Plan: Progress and Performance
4.1. As at 30 August 2024, 72% of the 2024/2025 Audit Plan is in progress. 
4.2. Appendix 1 lists all assignments completed in the period 1 June to 30 August 2024
together with a summary of overall assurances from each area of work. 
4.3. Key performance indicators for the period to August 2024 are included at Appendix
2. 
4.4. Members are asked to note progress. 
5 Glasgow City Region City Deal – Internal Audit Plan 2023/2024
5.1. At the August 2024 Cabinet meeting of the Glasgow City Region City Deal, audit
reports were presented on the Shared Prosperity Fund (SPF), Assurance Framework
Compliance and on the 2023/2024 Internal Audit Annual Report and Annual
Governance Statement.  A link to these reports can be found here. 
5.2. The audit of SPF, Assurance Framework Compliance sought to obtain assurance
that member authorities are complying with the requirements outlined in the SPF
Assurance Framework and that an adequate audit trail is being maintained. The
scope of the audit included a review of documented policies and procedures, roles
and responsibilities; governance and monitoring arrangements; reporting activities to
8
103

Page 104

track the progress and adherence to the SPF Assurance Framework; the Change
Control process; reporting requirements to the Glasgow City Region, Programme
Management Office (PMO) and the UK Government and record keeping
arrangements to maintain an audit trail. 
5.3. The audit concluded that a number of key controls are in place and generally
operating effectively. Key officers responsible for SPF, within both the PMO and
member authorities, are fully aware of their role in the process and the requirements
that are outlined in the Framework. All relevant officers at each member authority
were provided with details of the document and this has been made readily available
to all appropriate staff. Appropriate monitoring and reporting activities are in place
across the GCR and within each member authority. This includes internal reporting
within each organisation and more widely across the different GCR Support Groups. 
The audit found that quarterly and 6-monthly returns are submitted as required and
any discrepancies appropriately investigated by the PMO. The PMO are aware of the
thresholds and occasions where a formal change control should be adopted. It was
also noted that there are appropriate arrangements in place across the Region to
ensure that documents relating to SPF are retained for audit purposes and, where
required, these are restricted to relevant staff. 
5.4. The second report was in relation to the Internal Audit Annual Report and Annual
Governance Statement 2023/2024.  This report provided a positive audit opinion for
the year ended 31 March 2024 based on the audit work undertaken and the
assurances provided by member authorities.   
6. Progress against Strategy
6.1. The Public Sector Internal Audit Standards (PSIAS) require progress against the
audit strategy to be monitored and reported to the Committee as part of regular
monitoring reports that are presented at each meeting. 
6.2. Delivery of the strategy in 2024/2025 will be evidenced by the completion of the
Internal Audit Plan in-year and will be monitored through the performance indicators
regularly reported to the Committee. 
7. Employee Implications 
7.1. There are no employee issues. 
8. Financial Implications
8.1. A breakeven position for 2024/2025 is forecast at the end of the financial year for the
Internal Audit section. 
9. Climate Change, Sustainability and Environmental Implications
9.1 There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
10. Other Implications
10.1. The main risks to the delivery of the Audit Plan are, generally, vacancies and team
up-skilling requirements, unforeseen service demands and delays with client sign-off. 
These are mitigated by coaching and training, regular meetings and escalation
processes as well as inclusion of contingency time within the annual plan.  The risk
of significant, subsequent amendments to the Plan, arising from a change in the
Council’s priorities or risks, are mitigated by regular re-assessment of capacity and
Audit Plan content to allow incremental adjustments as the year progresses. 
104

Page 105

11. Equality Impact Assessment and Consultation Arrangements
11.1. There is no requirement to equality assess the contents of this report. 
11.2. Heads of Service are consulted on each and every audit assignment. 
Jackie Taylor
Executive Director (Finance and Corporate Resources)   
6 September 2024 
Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent 
Previous References
 Risk and Audit Scrutiny Committee - 2024/2025 Internal Audit Plan, 26 March 2024
 Risk and Audit Scrutiny Committee – Internal Audit Activity Report – 25 June 2024 
List of Background Papers
 Figtree extracts of Action Plans 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Yvonne Douglas, Audit and Compliance Manager
Ext:  2618
(Tel:  01698 452618)
E-mail:  yvonne.douglas@southlanarkshire.gov.uk
105

Page 106

Assignments completed 1 June to 30 August 2024    Appendix 1 
Job
Number Assignment name
Draft
Issue Final Issue Assurance Info
I350116 Governance Statements 25/06/2024 25/06/2024 Review of 2023/2024
Resource Directors’
Statements of
Assurance.  
I821044 2023/2024 Annual Report 10/06/2024 25/06/2024 Provision of annual
statement of
assurance. 
Job
Number Assignment name
Draft
Issue Final Issue Assurance Info
External Clients 
I912238 SLLC CCM 2023/24 17/06/2024 19/07/2024 Reported to SLLC.
I918247 SLLC 2023/2024 Annual
Report
12/08/2024 19/08/2024 Reported to SLLC
I928253 LVJB 2023/2024 Annual
Report
27/03/2024 03/06/2024 Reported to LVJB
I938257 SEEMIS 2023/2024 Annual
Report
21/05/2024 20/06/2024 Reported to SEEMIS 
106

Page 107

Key audit performance indicators as at 31 August 2024           Appendix 2 
Indicator Numbers Percentage Target Comment
Assignments
delivered within
budget
2/2 100% 80% 
Draft reports
delivered within 6
weeks of file
review 
2/2 100% 80% 
2024/2025 Audit
Plan completed
to draft by 30
April 2024
2/39 5% 100% 28/39 (72%) of 2024/2025 Audit Plan in progress at 31 August 2024.
Internal Audit
recommendations
delivered on time
n/a n/a 90% No audit actions have fallen due in the period to 31 August 2024.
Client to agree
findings and
actions within 4
weeks of draft
issue
2/2 100% 80% 
107

Page 108

108

Page 109

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee  
Date of Meeting: 24 September 2024
Report by: Executive Director (Finance and Corporate Resources) 
Subject: Fraud Statistics Annual Report 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide a summary of the fraud statistics for the year to 31 March 2024 and a
comparison to the same period in 2023 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the contents of this report are noted. 
3. Background
3.1. Collating and reporting fraud statistics and setting targets for improvement are
considered best practice by the Chartered Institute of Public Finance and
Accountancy (CIPFA) and the Association of Local Authority Risk Managers
(ALARM).   
3.2. This report provides information on the number, types and outcomes of fraud
investigations within South Lanarkshire Council (SLC) for the year to 31 March 2024
together with a comparison to the statistics for the same period in 2023.  It includes
all frauds reported to Internal Audit, benefit frauds during this period passed to the
Department for Work and Pensions (DWP) for investigation and insurance losses
resulting from a failure in internal controls or that have been investigated by Internal
Audit. 
3.3. Although the responsibility for housing benefit fraud investigations has transferred to
the DWP Fraud and Error Service (FES), SLC retains responsibility for the recovery
of fraud overpayments from their own Housing Benefit claimants.  Housing Benefit
fraud data will therefore continue to be included within the fraud statistics reported,
as information is provided by FES.     
3.4. Benefits and Revenue deliver an annual programme of rolling reviews on Housing
Benefit claimants based on risk-profiling to establish the most likely areas of benefit
fraud or overpayment. Information is also obtained from HMRC through the
Verification of Earnings and Pensions arrangement, from DWP through the Housing
Benefit Matching Service and from data gathered through the National Fraud
Initiative.  Where fraud is suspected, the case will be passed to FES for investigation
and, if proven, returned to SLC to pursue recovery.  Irrespective of whether a fraud is
proven or not, the Council takes steps to recover any overpayment. 
9
109

Page 110

4. Results
4.1. All concerns reported to Internal Audit are risk assessed with high risk areas
investigated by Internal Audit, medium risks investigated by Resources and low risks
registered for monitoring of trends.  Internal Audit may also undertake joint
investigations with Resources and the Fact-Finding team within Personnel Services
depending on the nature of the fraud and the operational knowledge required. 
4.2. Areas within the Council that have an inherently higher risk of fraud are considered
for inclusion in the annual Audit Plan.  There have been no new patterns or trends
identified in 2023/2024. 
4.3. An analysis of the fraud caseload for the year to 31 March 2024 and the comparative
period in 2023 is detailed in Table One. 
Table One - Fraud Caseload
Status
Year to  
31/03/24
Year to 
31/03/23 
Nos. £000 Nos. £000
Cases open as of 1 April  136 70 148 120
Concerns reported during financial year   101 32 36 11
DWP referrals - - (32) (45)
SLC caseload for the year    237 102 152 86
Cases closed in period (see Table Two) (66) (58) (16) (16)
Work in progress at 31 March    171 44 136 70 
4.4. DWP referrals made to the Council were previously included in cases reported but
were removed in 2022/2023 (32 cases) to ensure data reflects only the SLC-
managed element of the caseload.  For completeness, potential frauds identified by
the DWP, and relating to SLC, are reported separately (see paragraph 4.5). 
4.5. Cases reported in the year remain relatively low with the increase in the 2023/2024
caseload more comparable to pre-pandemic levels.  Patterns, however, remain
unchanged with cases coming primarily from suspected benefit fraud and theft.  In
addition to those cases summarised above, a further 22 SLC investigations are being
progressed by the DWP with a potential cumulative housing benefit
overpayment/fraud value of £27,000.  On conclusion of investigations, SLC will seek
repayment in line with standard recovery procedures. 
4.6. An analysis of closed cases in the year is detailed in Table Two: 
Table Two - Analysis of Closed Cases 
Source of fraud
Year to  
31/03/24
Year to 
31/03/23 
Nos. £000 Nos. £000
Founded allegation (see Table Three) 19 56 9 12
Insufficient information 28 2 1 0
Unfounded allegations 19 0 6 4
Total 66 58 16 16 
4.7. An analysis of founded allegations is detailed in Table Three: 
110

Page 111

Table Three – Analysis of Founded Allegations
Source of fraud
Year to  
31/03/24
Year to 
31/03/23 
Nos. £000 Nos. £000
External  18 56 7 7
Internal  1 0 1 0
Benefits 0 0 1 5
Total 19 56 9 12 
5. Improvements
5.1. Services work with the Security Coordinator or with Internal Audit to review and
address gaps in controls identified during the investigation of cases.  Where
appropriate, improvement plans are agreed with the relevant Heads of Service and
the actions followed up by Internal Audit to ensure implementation. Outcomes for
concluded investigations are reported to the Risk and Audit Scrutiny Committee as
part of Internal Audit’s annual assurance report. 
6. Employee Implications
6.1. SLC has a zero tolerance approach to fraud. Manager and employee roles and
responsibilities are set out in SLC’s Counter Fraud, Bribery and Corruption Policy. 
7. Financial Implications
7.1. The investigation of fraud, participation in the National Fraud Initiative (NFI) exercise
and the collection and reporting of fraud statistics is carried out within existing
resources.  The 2023/2024 Internal Audit Plan included 200 days to manage the NFI
exercise, disseminate fraud alerts and undertake anti-fraud assignments and fraud
investigations.  The anticipated time allocated across each activity required some
revision in the year with a further 26 days allocated from the contingency budget to
manage this element of the Internal Audit Plan.   
7.2. The majority of days used by Internal Audit in the year to 31 March 2024 relates to a
fraud investigation that is still ongoing.  Time budgets and target completion
timescales for investigations are set at the start of each audit and will vary depending
on the nature of the investigation.  These are reviewed and, at times, extended,
depending on the nature of findings.    
7.3. Outcomes from audit work completed in year was reported in the 2023/2024 Internal
Audit Annual Assurance Report or has been captured in the report on the 2022 NFI
exercise, a separate item on this meeting’s agenda.   
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. Fraud risk is recognised as one of the top risks facing SLC.  This risk is significant as
it can adversely affect the delivery of Council objectives and erode valuable
resources.  It is therefore important that the risk of fraud is soundly managed.  Fraud
Risk Registers are in place within all Resources and are reviewed and updated
annually in line with standard Risk Management procedures.  Periodic self-
assessment exercises against good practice guidance in fraud management inform
these updates. 
111

Page 112

9.2. The Council’s Serious and Organised Crime (SOC) working group have developed
an action plan to address the impact of COVID-19 on SOC and the challenges that
this has brought to the Council in the short, medium and long term.  The Group
progress delivery of various actions, revising if any new or emerging threats are
identified through the pan Lanarkshire Multi Agency SOC Group.   
9.3. The collection and reporting of fraud statistics assists in the management of fraud by
identifying patterns and trends of fraud and areas of high risk where preventative
controls should be concentrated. However, in order to do this effectively, fraud
statistics must be complete.  Internal Audit will continue to highlight areas where
practice could be improved to ensure that all instances of potential and actual fraud
are reported to Internal Audit.   
9.4. There are no sustainability issues in terms of the information contained in this report.   
10. Equality Impact Assessment and Consultation Arrangements
10.1. There is no requirement to undertake an equality impact assessment. 
10.2. Consultation was not necessary for this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 September 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Fraud Statistics 2022/2023 Annual Report, 22 August 2023
 Fraud Statistics Six Monthly Update, 30 January 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Yvonne Douglas, Audit and Compliance Manager
Ext:  2618  (Tel:  01698 452618)
E-mail:  yvonne.douglas@southlanarkshire.gov.uk
112

Page 113

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 24 September 2024
Report by: Executive Director (Finance and Corporate Resources) 
Subject: Year End Insured Risks Report – 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose}
 highlight trends on an annual basis, for insurance claims against the Council
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Insured Risks Report for year ended 31 March 2024 be noted.
[1recs]
3. Background
3.1. The Council has in place insurance policies for employers’ liability, public liability,
motor, property and other miscellaneous risks.   
3.2. The combined liability policy covers both public liability (PL) and employer’s liability
(EL) claims. The PL section of the policy provides indemnity for the Council’s legal
liability to pay claims for death, injury and disease to third parties, as well as third party
property damage, where the Council is found to be responsible for such losses. The
EL section of the policy covers employee injury, disease, and death, where the Council
is deemed to be negligent. The self-insured excess for this policy is £0.500 million. 
3.3. Motor insurance provides comprehensive cover for all council vehicles and injuries
resulting from motor incidents.  The self-insured excess for this policy is £0.150 million. 
3.4. The property insurance policy covers damage/loss to council buildings and assets. 
The self-insured excess for this policy was increased at renewal on 1 April 2024 to
minimise the extent of premium increases against a challenging insurance market. 
The self-insured excess for this policy is £0.500 million for all claims (increased from
£0.100 million), other than for storm and flood where a £1.000 million excess applies
(increased from £0.500 million). 
4. Five Year Overview
4.1. Claims which fall under the main policies are handled by the Council’s Risk
Management section and external claims handlers, Gallagher Bassett for combined
liability claims, and the Davies Group for motor claims.  The number and cost of these
claims form the basis of this report and includes comparisons with previous years. 
4.2. Claims will continue to be intimated beyond the financial year end, with numbers
increasing by approximately 10 per cent due to those incidents that have taken place,
but claims have not yet been reported to the Council.
10
113

Page 114

4.3. Up to date annual comparisons for the last 5 years are included at Appendix 1. The
comparison shows that claim numbers have fluctuated over the period, with the
highest number of claims being intimated in 2019/2020 (996).  The average number
of claims intimated each year is 870, therefore, with 886 claims intimated for
2023/2024, last year’s claim numbers are slightly above average.  It should be noted
also that 2020/2021 experienced an unusually low number of claims, due to reduced
operations at the start of the pandemic, which affects the 5-year average figure.   
4.4. Claims costs have also fluctuated over the last 5 years. On average, over that period,
the self-insured cost of claims per annum is £2.444 million, with 2023/2024 costs
notably above average at £3.548 million. It should be noted however that last year’s
figures are higher due to a number of significant storm events, with the self-insured
estimated cost of these four losses being £0.801 million. Inflation, increased costs of
materials, car parts and repair charges has impacted on claim values also. 
4.5. In addition, to allow comparison of the position as at the year-end for the last 2 years,
Appendix 2 compares the claim numbers and costs for incidents reported in 2022/2023
as at 31 March 2023 against incidents reported in 2023/2024, as at 31 March 2024. 
In effect, this compares the equivalent position and removes the impact of late claims
notification for both years. 
5. Total losses reported as at 31 March each year – 2022/2023 v 2023/2024
5.1. Based on the comparisons in Appendix 2, the overall number of claims for all classes
received to date for incidents occurring during 2023/2024 is 886. This is an increase
of 7 claims (1 per cent) on the numbers reported last year for 2022/2023.   
5.2. The total self-insured estimated cost of claims for 2023/2024 is £3.548 million.  At the
same time last year estimated claims costs for 2022/2023 was £2.475 million.  This is
an increase of £1.073 million (43 per cent). One of the main reasons for the increase
in costs last year is due to damage to council properties as a result of 4 significant
storm events that occurred over the winter period. 
5.3. Based upon Appendix 2, sections 6 to 8 detail some of the key findings from the
analysis of 2023/2024 claims. 
6. Combined liability claims
6.1. The combined liability policy covers for both public liability (PL) and employer’s liability
(EL) claims. The PL section of the policy provides indemnity for the Council’s legal
liability to pay claims for death, injury and disease to third parties, as well as third party
property damage, where the Council is found to be responsible for such losses. The
EL section of the policy covers employee injury, disease, and death, where the Council
is deemed to be negligent. The following sections detail the current position for
2023/2024 and makes comparisons against the position reported for 2022/2023 as at
31 March 2023. 
6.2. 415 claims have been received for 2023/2024, with an estimated value of £1.361
million. 
6.3. The number of claims received for 2022/2023 was 440 and the estimated settlement
value of these claims was £0.948 million.  The 2023/2024 figures represent a 6 per
cent reduction in claims received however a there has been a 43.5 per cent increase
in claims costs. 
114

Page 115

6.4. Despite the overall number of claims reducing, there has been a higher number of
significant injury and property damage claims received from members of the public .
These claims are the main reason for the increasing claim costs. It is anticipated that
the value of these ongoing claims will change as claims are answered and files closed
off by claims handlers. 
6.5. The main area where a decrease in claim numbers has been seen is in Housing and
Technical Resources where 68 fewer claims have been received, due to less public
liability claims for water damage from burst pipes. 
6.6. A further breakdown of public liability claims numbers and costs specifically for Roads
and for other services within Community and Enterprise Resources is contained within
Appendix 3. 
7. Motor claims
7.1. The Council’s motor insurance policy provides comprehensive cover for all council
vehicles and injuries resulting from motor incidents.  The following sections detail the
current position for 2023/2024 and makes comparisons against the position reported
for 2022/2023 as at 31 March 2023.   
7.2. 394 claims have been received for 2023/2024, with an estimated value of £0.697
million. 
7.3. At the same time last year, 395 motor claims had been received for incidents during
2022/2023, with an estimated settlement value of £0.629 million.  This equates to an
11 per cent increase in costs, which is in part, due to the rising costs of vehicle parts
and repairs.   Claim numbers remain in line with the 2 previous years. 
7.4. “At fault” incidents continue to be monitored. Table One compares the number and
cost of “at fault” incidents for the last 5 years. 
Table One – Comparison of “at fault” incidents  
Number of
vehicles on
fleet
Number
of
incidents
Cost of
incidents
Number of
Accidents
per vehicle
Average
cost per
incident
2019/2020 1,588 145 £367,909 0.09 £2,537
2020/2021 1,808 127 £328,250 0.07 £2,585
2021/2022 1,834 189 £432,672 0.10 £2,289
2022/2023 1,863 200 £471,263 0.11 £2,356
2023/2024 1,700 184 £315,446 0.11 £1,714 
7.5. The number of “at fault” incidents has improved, with 16 fewer incidents during
2023/2024, when compared to the previous year. At the same time vehicle numbers
on the Council’s fleet have decreased by 163. 
7.6. With 0.11 “at fault” incidents per vehicle for 2023/2024, this is above the average for
the four previous years (0.09). 
7.7. Following the roll out of a driver behaviour training programme for managers, a further
training course on challenging driver behaviour specifically aimed at employees who
drive a fleet vehicle or who use their own vehicle or pool cars whilst on council business
was recently launched.  The course has been developed to provide guidance to drivers
on actions that they can take to reduce the likelihood of them being involved in a motor
accident.    
115

Page 116

8. Property claims
8.1. The property insurance policy covers damage/loss to council buildings and assets. 
This section of the report details the current claim position for 2023/2024 and makes
comparisons against the status reported for 2022/2023 as at 31 March 2023.   
8.2. 77 claims have been received for 2023/2024, with an estimated self-insured value of
£1.491 million. 
8.3. The overall number of claims intimated for 2023/2024 has increased by 33 from the
previous year, which equates to a 75 per cent increase. The value of estimated claims
intimated during 2023/2024 at £1.491 million is an increase of £0.594 million from
2022/2023, a 66 per cent increase. 
8.4. The reason for the increase is due to more weather events taking place over the winter
months that resulted in damage to council properties, mainly housing stock, and an
increased number of fires within the housing stock. 
8.5. The overall value of the 4 storm claims that occurred during 2023/2024 is £0.801
million. In line with the current uninsured excess for storm on the Council’s property
insurance policy, the first £0.500 million of each storm claim will require to paid from
the Council’s Self Insurance Fund.  
8.6. The main cause of property claims during 2023/2024 continues to be fires within the
council’s housing stock. The number of council house fires resulting in insurance
claims has increased by 14, from 13 incidents in 2022/2023 to 27 in 2023/2024.  Costs
over this period have increased by £0.177 million, from £0.330 million in 2022/2023 to
£0.507 million in 2023/2024.  The main causes of fires within council housing are as a
result of wilful fire raising, cooking and cigarettes/smoking materials.  Details of actions
being taken to reduce this risk are noted in section 9.3. 
9. Insurance hotspots and claim mitigation
9.1. Following a health and safety training review by Gallagher Bassett last year an action
plan is being prepared to help mitigate against accidents and claims. 
9.2. Resources are also being asked to respond with details of the actions taken to
minimise the risk of recurring losses and to mitigate against future claims. 
9.3. The Council continues to raise awareness to council tenants on fire prevention and
measures that can be taken to reduce the risk of burst pipes. 
10. Employee Implications
10.1. Time and effort will continue to be required by Resource personnel to deal with the
significant number of claims intimated. Resource Personnel will also require to
dedicate time to implementation of initiatives to mitigate insurance hotspots. 
11. Financial Implications
11.1. Claims received to date, for incidents which occurred during 2023/2024 have an
estimated self-insured cost of £3.548 million.  It is reasonable to expect this value to
increase due to incidents that have taken place, but claims have not yet been received.   
11.2. During 2023/2024, a total of £2.782 million was paid out by the council on all claims,
irrespective of their incident date.  For claims which occurred between 1 April 2023
and 31 March 2024, £0.313 million was paid out by the Council.  These costs include
claims payments and other associated costs. 
116

Page 117

11.3. The total cost of loss for 2023/2024 was £5.274 million.  This covers self-insured
claims costs, (£2.782 million) insurance premiums (£2.492 million), and other costs for
contracted insurance services.  For 2022/2023 the total cost of loss was £4.546 million. 
11.4. The balance in the insurance fund will require to be closely monitored to ensure
adequate funds are available to meet known liabilities. 
12. Climate Change, Sustainability and Environmental Implications 
12.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
13. Other Implications
13.1. The cost of insurance claims and premiums is linked to the Council top risk ‘Reduction
in external funding and fees/income received by the council, as well as increased
financial pressures/demand for services; results in savings difficulties’. 
13.2. Over the last 5 years, the council’s claims handlers have repudiated a total of 1,549
public liability claims, which reduces the potential level of claim settlements. This
equates to a repudiation rate of 64 per cent. 
13.3. Failure to adequately manage insurance hotspots is likely to lead to increased claims
numbers, self-insurance costs and insurance premiums.  This risk is mitigated through
the insurance hotspots review and associated action plans and other risk management
initiatives implemented by Resources. 
14. Equality Impact Assessment and Consultation Arrangements
14.1. There is no requirement to carry out an impact assessment in terms of the proposals
contained within this report. 
14.2. Consultation has taken place with Resource risk representatives. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
2 September 2024 
Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent 
Previous References
 Risk and Audit Scrutiny Committee – 2023/2024 Year End Insured Risks – 22 August
2023 
List of Background Papers
 Insured Risks Annual Report for year ended 31 March 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions)
Ext:  4951 (Tel: 01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk
117

Page 118

Appendix 1
Full year claims numbers and values by Resource as at 31 March 2023. 
All claim types     
Number of claims 2019/20 2020/21 2021/22 2022/23 2023/24
Community and Enterprise 633 520 555 484 541
Education 32 22 40 27 35
Finance and Corporate 2 2 1 2 2
Housing and Technical 397 261 298 309 205
Social Work 65 83 101 107 103
Total 1,129 888 995 929 886
Reported at individual year end 996 768 822 879        
Cost of claims 2019/20 2020/21 2021/22 2022/23 2023/24
Community and Enterprise £1,188,488 £597,969 £1,165,185 £735,788 £1,283,276
Education £52,383 £377,183 £171,370 £144,081 £202,275
Finance and Corporate £50 £0 £8,000 £10,000 £16,500
Housing and Technical £1,233,596 £564,591 £550,359 £1,515,266 £1,851,783
Social Work £72,955 £478,689 £290,614 £181,594 £194,404
Total £2,547,473 £2,018,432 £2,185,528 £2,586,729 £3,548,238
Reported at individual year end £1,946,633 £2,009,739 £2,241,620 £2,474,988              
Combined Liability           
Number of claims 2019/20 2020/21 2021/22 2022/23 2023/24
Community and Enterprise 399 308 280 323 309
Education 17 11 36 17 15
Finance and Corporate 1 2 1 2 1
Housing and Technical 231 166 169 174 75
Social Work 8 10 7 9 15
Total 656 497 493 525 415            
Cost of claims 2019/20 2020/21 2021/22 2022/23 2023/24
Community and Enterprise £790,440 £278,057 £513,661 £373,589 £818,300
Education £48,674 £362,206 £169,723 £123,644 £98,354
Finance and Corporate £50 £0 £8,000 £10,000 £16,500
Housing and Technical £666,062 £291,982 £397,959 £590,933 £344,890
Social Work £39,776 £422,993 £207,330 £91,262 £82,619
Total £1,545,003 £1,355,239 £1,296,673 £1,189,428 £1,360,663            
Motor          
Number of claims 2019/20 2020/21 2021/22 2022/23 2023/24
Community and Enterprise 202 189 213 187 211
Education 6 1 2 7 10
Finance and Corporate 1 0 0 0 1
Housing and Technical 121 56 94 114 93
Social Work 54 63 84 91 79
Total 384 309 393 399 394            
Cost of claims 2019/20 2020/21 2021/22 2022/23 2023/24
Community and Enterprise £363,108 £293,834 £456,971 £341,649 £421,169
Education £365 £1,163 £1,297 £5,283 £6,926
Finance and Corporate £0 £0 £0 £0 £0
Housing and Technical £191,063 £87,594 £152,400 £184,318 £157,583
Social Work £33,179 £55,152 £76,456 £89,756 £110,935
Total £587,715 £437,743 £687,124 £621,006 £696,614                       
118

Page 119

Property          
Number of claims 2019/20 2020/21 2021/22 2022/23 2023/24
Community and Enterprise 32 23 23 15 21
Education 9 10 2 3 10
Finance and Corporate 0 0 0 0 0
Housing and Technical 45 39 35 21 37
Social Work 3 10 10 7 9
Total 89 82 70 46 77            
Cost of claims 2019/20 2020/21 2021/22 2022/23 2023/24
Community and Enterprise £34,941 £26,078 £194,553 £20,550 £43,807
Education £3,343 £13,812 £350 £15,153 £96,995
Finance and Corporate £0 £0 £0 £0 £0
Housing and Technical £376,470 £185,016 £285,014 £740,015 £1,349,310
Social Work £0 £544 £6,828 £576 £850
Total £414,754 £225,450 £486,745 £776,294 £1,490,962 
119

Page 120

Appendix 2
Comparison of claims costs and numbers for claims occurring during the last 2 years as at
their respective year ends 
All claim types    
Number of claims 2022/23 as at 31
March 2023
2022/23 as at 31
March 2024
Difference Difference
Percentage
Community and
Enterprise 478 541 63  13%
Education 18 35 17  94%
Finance and
Corporate 1 2 1  100%
Housing and
Technical 276 205 -71  -26%
Social Work 106 103 -3  -3%
Total 879 886 7  1%     
Cost of claims 2022/23 as at 31
March 2023
2022/23 as at 31
March 2024
Difference Difference
Percentage
Community and
Enterprise £785,418 £1,283,276 £497,858 63%
Education £128,098 £202,275 £74,178 58%
Finance and
Corporate £13,050 £16,500 £3,450 26%
Housing and
Technical £1,335,302 £1,851,783 £516,481 39%
Social Work £213,121 £194,404 -£18,718 -9%
Total £2,474,988.43 £3,548,237.81 £1,073,249 43% 
Combined liability    
Number of claims 2022/23 as at 31
March 2023
2022/23 as at 31
March 2024
Difference Difference
Percentage
Community and
Enterprise 278 309 31  11%
Education 9 15 6  67%
Finance and
Corporate 1 1 0  0%
Housing and
Technical 143 75 -68  -48%
Social Work 9 15 6  67%
Total 440 415 -25  -5.7%     
Cost of claims 2022/23 as at 31
March 2023
2022/23 as at 31
March 2024
Difference Difference
Percentage
Community and
Enterprise £413,682 £814,415 £400,733  97%
Education £109,178 £126,939 £17,761  16%
Finance and
Corporate £13,050 £16,500 £3,450  26%
Housing and
Technical £318,637 £344,890 £26,253  8%
Social Work £93,652 £57,919 -£35,733  -38%
Total £948,199 £1,360,662 £412,463  43% 
120

Page 121

Motor    
Number of claims 2022/23 as at
31 March
2023
2022/23 as at
31 March
2024
Difference Difference
Percentage
Community and Enterprise 186 211 25  13%
Education 6 10 4  67%
Finance and Corporate 0 1 1  0%
Housing and Technical 112 93 -19  -17%
Social Work 91 79 -12  -13%
Total 395 394 -1  0%     
Cost of claims 2022/23 as at
31 March
2023
2022/23 as at
31 March
2024
Difference Difference
Percentage
Community and Enterprise £340,086 £421,169 £81,083 24%
Education £3,237 £6,926 £3,690 114%
Finance and Corporate £0 £0 £0 0%
Housing and Technical £168,507 £157,583 -£10,924 -6%
Social Work £117,668 £110,935 -£6,732 -6%
Total £629,497 £696,614 £67,117 11%     
Property    
Number of claims 2022/23 as at
31 March
2023
2022/23 as at
31 March
2024
Difference Difference
Percentage
Community and Enterprise 14 21 7  50%
Education 3 10 7  233%
Finance and Corporate 0 0 0  0%
Housing and Technical 21 37 16  76%
Social Work 6 9 3  50%
Total 44 77 33  75%     
Cost of claims 2022/23 as at
31 March
2023
2022/23 as at
31 March
2024
Difference Difference
Percentage
Community and Enterprise £31,650 £43,807 £12,157 38%
Education £15,683 £96,995 £81,312 518%
Finance and Corporate £0 £0 £0 0%
Housing and Technical £848,158 £1,349,310 £501,152 59%
Social Work £1,802 £850 -£952 -53%
Total £897,293 £1,490,962 £593,669 66% 
121

Page 122

Appendix 3
Public Liability – Community and Enterprise Resources Roads and other claims       
Number of claims 2019/20 2020/21 2021/22 2022/23 2023/24 Total
Roads claims - injury 77 71 59 45 38 290
Community and
Enterprise Resources
other - injury 10 8 10 10 8 46
Roads claims – property
damage 252 178 160 221 195 1,006
Community and
Enterprise Resources
other – property damage 50 40 46 38 32 206
Total 389 297 275 314 273 1,548       
Cost of claims 2019/20 2020/21 2021/22 2022/23 2023/24 Total
Roads claims - injury £562,301 £161,790 £448,655 £151,542 £444,031 £1,768,320
Community and
Enterprise Resources
other - injury £32,658 £15,759 £4,150 £93,755 £20,620 £166,942
Roads claims – property
damage £28,800 £48,803 £18,811 £29,438 £106,617 £232,468
Community and
Enterprise Resources
other – property damage £24,327 £8,108 £8,297 £4,517 £36,522 £81,770
Total  £648,086 £234,460 £479,913 £279,252 £607,790 £2,249,500 
*note number and cost of these public liability claims are also contained in Appendix 1. 
122

Page 123

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 24 September 2024
Report by: Executive Director (Finance and Corporate Resources) 
Subject: Year End Risk Management Report (2023/2024) and
Review of Council's Top Risks (2024/2025)   
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Risk and Audit Scrutiny Committee (RASC) with an update on progress
with risk management activity undertaken during 2023/2024
 provide an update on the Council’s top risk register following the review and
consultation process
 provide an update on the Council’s Risk Management Strategy following a review
process
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that Resource compliance with the requirements of the Risk Management
Strategy be noted;
(2) that the progress being made in delivering actions to mitigate top Council risks
be noted;
(3) that the updated Council top risks, detailed at Section 6, are noted; and
(4) that the updated Risk Management Strategy be noted.
[1recs
3. Background
3.1. Annual reviews of the Council’s top risks are undertaken, with the findings of the last
review reported to the Committee on 31 October 2023. This year’s full review
commenced in April 2024.  The consultation involved views being sought from Heads
of Service, Elected Members and Trade Unions on new areas of risk. 
3.2. The results of the work undertaken was considered and used to inform proposals for
a refined set of top risks.  The feedback was used to review risk descriptions, as
required. 
3.3. The content of this report provides the Committee with the outcome of the review of
these risks. 
4. Resource compliance with the Risk Management Strategy 
4.1. Risk Sponsors are required on an annual basis to assess Resource compliance with
the Risk Management Strategy and provide supporting evidence.  The information for
2023/2024 is summarised in the end of year compliance statement which is attached
at Appendix 1. 
11
123

Page 124

4.2. Appendix 1 shows that Resources continue to demonstrate full compliance with the
Strategy, having scored 45 out of 45. 
4.3. It is important that the current level of compliance is maintained to demonstrate
effective risk management which contributes to robust service planning and improved
decision making. 
5. Progress made in delivering actions to control the Council’s top risks
5.1. As at 31 March 2024, the percentage of actions completed on the 2023/2024 risk
control plan was 94.4 per cent against an overall target of 90 per cent. One action,
‘Develop neighbourhood plans in East Kilbride and Hamilton’, has been delayed and
carried forward to the 2024/2025 risk control plan. 
5.2. Table 1 below shows the overall status as at 31 March 2024 for all actions relating to
the Council’s top risk register. 
Table 1 – Completion of top risk control actions
Action status Number of
actions
Percentage
of actions
Complete 17 94.4%
Carried forward to 2024/2025 1 5.6%
Total 18 100% 
5.3. Actions identified during this year’s review have been included within the 2024/2025
top risk control plan.  This contains a total of 15 actions. 
6. Results of the review of the Council’s top risks
6.1. To assist the review process, the following broad criteria were recommended as a
guide to concluding what constitutes a top risk:- 
 it threatens delivery of corporate objectives
 it impacts on other services or partnerships
 there are financial impacts or it impacts on other key priority strategies
 there are impacts of a social or demographic context 
6.2. Risks from last year’s review, as detailed on the report to Committee on 31 October
2023, were mostly deemed to be still valid. The main changes and developments with
the top risks are summarised below:- 
 Two new risks have been added:-
 The Council inherits commercially unviable shopping centres due to the
financial failure of existing owner/management companies resulting in
significant financial and operational liabilities transferring to the council.
 The Council fails to comply with its statutory duties by not conducting
sufficiently robust impact assessments where the same are required,
including in respect of budget/service redesign proposals, leading to
potential legal and financial challenges, which could result in failure to
deliver those proposals.
 Some key risk wordings have been updated to reflect the current status of risks
and/or to provide more straightforward and understandable risk descriptions.
 The risk score for ‘Inability of the Council to effectively provide accommodation
and support to households who are homeless and people who arrive in South
Lanarkshire as part of refugee resettlement and the asylum seeker dispersal
programmes, (including those for unaccompanied children)’ has increased from
124

Page 125

16 to 20. This is consistent with the difficulties faced managing the risk, reflected
in the Council’s recent declaration of a housing emergency.
 The risk score for ‘Inability to take the necessary action due to funding
constraints, to combat climate change, and work toward achieving net zero
carbon emissions by 2045, thereby contributing to negative and irreversible
environmental, social and economic impacts on the Council and its residents’ has
increased from 16 to 20, to reflect funding constraints and difficulties faced by the
Council in meeting climate change targets.
 The risk score for ‘Fraud, theft, organised crime and cyber attacks’ has increased
from 12 to 20. Whilst controls in this area have been assessed as adequate, the
threat landscape is very active at the moment and shows no signs of easing.
 The residual score for ‘The Council does not fully deliver the strategic outcomes
required of the IJB as outlined in their Strategic Commissioning Plan’ has
increased from 16 to 20, due to the requirement to implement significant savings
to address budget shortfalls alongside significant demand pressures.
 The residual risk score in respect of ‘Lack of capacity and skills to meet increased
service demands’ has increased from 9 to12 in light of a shift in supply/demand
of officers and recruitment difficulties.
 The risk score for ‘Increasing levels of adverse weather’ has gone up from 9 to
16. This reflects more frequent issues being encountered by the council as a
result of weather-related events, including significant damage to council
properties over recent years as a result of storms and burst pipes. Weather
events are also impacting upon the Council’s property insurance premiums and
level of uninsured excesses carried.
 The risk score has reduced from 16 to 9 in relation to the ‘Implications of the
Scottish Fire and Rescue Service Unwanted Fire Alarm Signals Policy within the
Council's non-domestic estate’ risk.  The continuing risk in this area is mainly in
respect of property damage due to a fire when the property is unoccupied out of
hours. Our property claims history indicates that the risk of fires in non-domestic
properties is low, and additionally our schools are protected either by sprinklers
or fire suppression systems, which further mitigate this risk.
 The ‘Community Wealth Building Strategy’ risk score has reduced from 16 to 9
which aligns this risk with the risks for the council’s other plans and strategies.
 The ‘IT development/functionality’ risk description has been widened to
encompass implementation of new systems. This reflects the three significant IT
projects which continue to be progressed at present for the Integrated Housing
Management System, the SWIS+ replacement (Liquidlogic) and Fusion. 
6.3. The Council’s top risk register is monitored on an ongoing basis and updates are
reported annually to this Committee. Risk scores and rankings may be amended if
new information comes to light that allows the position to be reassessed. 
6.4. As a result of the above changes and taking account of the revision of risk scores, the
top risk register for 2024/2025 is attached at Appendix 2.  
7. Benchmarking
7.1. A benchmarking exercise was undertaken by the Scottish Local Authority Chief
Internal Auditors Group (SLACIAG) in December 2023. A total of 28 public sector
organisations (including South Lanarkshire Council) took part in the exercise. This
review established that the current South Lanarkshire Council top risk register is in the
main reflective of the risks faced by authorities. 
125

Page 126

7.2. The AON Global Risk Management Survey was published within ALARM Stronger
Journal in April 2024. This survey collects the views of more than 2,800 decision
makers across the public and private sectors and provides an indicator of the risk
landscape being faced across a number of organisations. 
7.3. The survey noted the top 10 current risks being faced by the public sector, as well as
the top 10 future risks.  These are noted in Table 2 below: 
Table 2 – Current and Future Risks faced by the public sector 
Current risks Current risks –
SLC position
Future risks Future risks –
SLC position
1 Cyber attack or
data breach
Already covered
within top risks
Cyber attack or
data breach
Already covered
within top risks
2 Damage to brand
or reputation
Covered as an
impact within a
number of top
risks
Failure to attract
or retain top
talent
Already covered
within top risks
3 Failure to attract
or retain top
talent
Already covered
within top risks
Economic
slowdown or slow
recovery
Already covered
within top risks
4 Regulatory or
legislative
change
Scored as a
medium risk
rating and
monitored at
Resource level
Regulatory or
legislative change
Scored as a
medium risk
rating and
monitored at
Resource level
5 Economic
slowdown or
slow recovery
Already covered
within top risks
Cash flow or
liquidity risk
Already covered
within top risks
6 Cash flow or
liquidity risk
Already covered
within top risks
Damage to brand
or reputation
Covered as an
impact within a
number of top
risks
7 Property damage Already covered
within top risks
Capital
availability
Already covered
within top risks
8 Business
Interruption
Already covered
within top risks
Failure to
innovate or meet
customer needs
Covered by a
number of
existing top risks
9 Political risk Not considered
appropriate at
this time
Workforce
shortage
Already covered
within top risks
10 Failure to
innovate or meet
customer needs
Covered by a
number of
existing top
risks
Artificial
intelligence
Not considered
appropriate at
this time 
7.4. The vast majority of these risks have also been captured within the current top risks,
and, therefore, provides further comfort that the Council’s understanding of our current
and future risk landscape is in line with other public sector bodies.  Further detail on
the potential risks posed by Artificial Intelligence is covered within Section 8, Horizon
Scanning. 
7.5. A watching brief will be kept on these areas, to ascertain if any further risks materialise.  
126

Page 127

8. Horizon Scanning 
8.1. Through wider analysis and discussion with the Council’s Risk Sponsors Group, areas
that could pose potential threats and risks or emerging issues and opportunities that
could affect the council were identified. Areas identified are listed below:- 
 Transformational Change
The Council is embarking upon a transformational change programme which will 
include a series of Cross-Cutting Reviews, focussing on council-wide activities
rather than individual Resources. Monitoring of the delivery of transformational
change reviews will inform whether an overarching ‘transformational change’ risk
requires to be developed and added to the top risk register. Outcomes from the
reviews offer mitigation to the top risk on funding. 
 Scotland Excel Supply Chain Intelligence Report
A recent Scotland Excel Supply Chain Intelligence report highlights a significant
number of national and global issues that will present supply chain challenges.
This report has been circulated throughout the Council and Resources are being
encouraged to prepare and where possible put plans in place to react to the
challenges that arise. A further intelligence report is due to be provided by the
end of the year. 
 Artificial Intelligence
As the capabilities of Artificial Intelligence (AI) continue to evolve, there are
potential implications for the Council that warrant close monitoring. While AI
offers opportunities to enhance efficiency and service delivery, it also presents
risks such as ethical concerns, data privacy issues, and potential displacement
of jobs within the public sector. The rapid pace of AI development may outstrip
existing regulatory frameworks, leading to challenges in governance and
accountability. Although AI is not currently included in the risk register, it is
important to remain vigilant, particularly in areas such as automated decision-
making, cybersecurity threats, and the integration of AI-driven tools in public
services. 
8.2. These areas will continue to be monitored to ensure that the Council is adequately
prepared to respond where required. 
9. Three lines model 
9.1. The ‘three lines’ model was developed by the Institute of Internal Auditors.  When using
this model, risk controls are categorised under three lines of defence.  This aims to
provide assurance around the adequacy of control measures that are in place to
mitigate strategic risks, identify control descriptions that need amendment to clearly
link these to the mitigation of the risk and to highlight any residual gaps in controls that
require to be addressed.   
9.2. Internal Audit work on the three lines model for the top risks is concluding and
Resource Risk Sponsors will now be provided with individual analysis and guidance
to support them in developing further controls to close any gaps identified from the
three lines approach for the council top risks that they lead on. 
9.3. The guidance will cover the following areas:-  
127

Page 128

 introduction and explanation of the three lines model
 a summary of all of the top risks that the Resource is responsible for along with
a percentage analysis (Percentage split of how the existing controls fall into each
of the three lines, highlighting gaps for consideration) 
 some advice for each Resource on how controls can be developed (using specific
examples) to provide a good coverage of controls across the three lines for each
risk area. 
10. Scope and appetite for risk
10.1. The Council aims to be risk embracing, that is it will accept a tolerable level of risk in
seeking service efficiencies and in agreeing control measures. 
10.2. The level of risk facing the council is measured both before (inherent risk) and after
(residual risk) consideration of controls.  The Council should never carry a very high
residual risk exposure as this would indicate instability, but a low residual risk exposure
should also be avoided as this indicates lack of innovation. 
10.3. The Council’s universal risk tolerance levels were updated as part of the review of the
risk management strategy last year, with the ideal risk profile defined as:- 
 no more than 10 per cent of residual risks at a very high level
 no more than 15 per cent of risks at a high level
 around 50 to 60 per cent of residual risks at a medium level
 no more than 30 per cent of residual risks at a low level 
10.4. Table 3 below shows the top risks heat map, i.e. it details the total number of risks for
each individual risk score.  Table 4 below notes the overall risk profile for the top risks. 
Table 3 – Top risks heat map
Likelihood
5
Almost certain    4 
4
Likely   6 5 3
3
Possible   5 2 
2
Unlikely    3 
1
Rare     
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
Table 4 –Top risks risk profile
Risk
category
Risk
rating
Number
of risks
Percentage
of risks
1 Very high 12 42.9%
2 High 16 57.1%
3 Medium 0 -
4 Low 0 - 
10.5. The main changes to the risk profile from last year are:-  
128

Page 129

 Two new very high risks have been added to the top risk register:-
 The Council inherits commercially unviable shopping centres due to the
financial failure of existing owner/management companies resulting in
significant financial and operational liabilities transferring to the Council
 The Council fails to comply with its statutory duties by not conducting
sufficiently robust impact assessments where the same are required,
including in respect of budget/service redesign proposals, leading to
potential legal and financial challenges, which could result in failure to
deliver those proposals  
 Two risks have moved from being high up to very high:-
 Fraud, theft, organised crime and cyber attacks
 Increasing levels of adverse weather
 Two risks have moved from being very high down to high:-
 Implications of the Scottish Fire and Rescue Service Unwanted Fire Alarm
Signals Policy within the council's non-domestic estate
 The Council fails to deliver the objectives of the Community Wealth Building
Strategy 
10.6. The number of very high risks has increased from 10 last year to 12.  There are
currently 16 risks scored at the high level, the same number as last year.   
10.7. The profile noted in Table 4 is outwith the ideal universal risk exposure defined by the
Risk Management Strategy. These are, however, the highest level risks currently
being faced by the Council. 
10.8. The Council is now carrying a slightly higher level of risk than last year. Whilst this
profile is not unusual in the current climate, where possible further mitigation is
encouraged. Upon completion of the exercise to categorise controls using the ‘three
lines’ model (noted at section 9 of the report), further work will be undertaken to review
controls and where required risk owners should consider implementation of new
actions to further mitigate risks and review residual scores thereafter.   
11. Review of the Risk Management Strategy
11.1. To comply with best practice and to ensure it is fit for purpose, a review the Risk
Management Strategy has been undertaken this year. The review was undertaken by
the Risk Management team, with input from the Council’s Risk Sponsors. 
11.2. There have been no fundamental changes to the strategy. The main revisions are
summarised below:- 
 a general refresh to bring the strategy up to date including refences to revised
information contained within Connect
 updated opening Chief Executive Statement
 introduction of guidance from the Institute of Internal Audit three lines model, to
allow a better means of recording and categorising risk controls
 revisions to the risk matrix categories (low, medium, high and very high) to
improve prioritisation and focus mitigation on higher scored risks
 updated risk tolerance levels to provide a better balance on previously set levels
and acknowledge requirement to accept a higher level of risk 
11.3. The Committee is asked to note the updated Risk Management Strategy, attached at
Appendix 3.  
129

Page 130

11.4. In summary the Strategy details:- 
 a policy statement which sets out the Council’s commitment to risk management,
as one of the principal elements of good governance
 encouragement of reasonable risk taking in order to make service improvements
and enable positive outcomes; the implementation of mitigating control measures
to avoid or reduce the impact of losses and deterioration in services; the
preparation and testing of business continuity plans for responding to emergency
events
 clear aims, objectives and measures of success
 how and when to apply risk management
 roles and responsibilities for employees at all levels in the Council
 the Council’s risk tolerance level when seeking opportunities, services
efficiencies and in agreeing control measures
 core requirements for Resources
 monitoring and Reporting arrangements 
11.5. The revised Strategy will take effect from 1 April 2025, to allow to final round of
2024/2025 risk reporting to be completed using existing scoring and tolerance
guidance. The strategy will be issued via a management bulletin and the Risk
Sponsors Group. 
12. Employee Implications
12.1. There are no direct employee implications relative to this report.  There are proposed
risks which are classified under the heading of employee.  Where this is the case the
appropriate controls and actions have been included in the risk control cards and
progress will be monitored. 
13. Financial Implications
13.1. There are no direct financial implications associated with the Council’s top risks.  There
are a number of proposed risks which are classified under the heading of financial. 
Where this is the case, the appropriate controls and actions have been included in the
risk control cards and progress will be monitored. 
14. Climate Change, Sustainability and Environmental Implications
14.1. There are no direct implications associated with the Council’s top risks.   
14.2. A specific risk has been included within the Council’s top risk to cover climate change
and environmental implications.  The risk is titled ‘Inability to take the necessary action
due to funding constraints, to combat climate change, and work toward achieving net
zero carbon emissions by 2045, thereby contributing to negative and irreversible
environmental, social and economic impacts on the council and its residents.’  Control
measures that currently mitigate against this risk have been identified, with a number
of additional actions recorded to further strengthen these controls. 
14.3. There are a number of further risks within the Council’s top risk register which are
categorised under the risk classification ‘Environmental’ and/or are linked to the
Connect Outcome ‘Communities and Environment’.  Appropriate controls and actions
have been identified within the individual risk control cards and progress will be
monitored. 
15. Other Implications
15.1. Failure to demonstrate that risk is actively considered and managed can not only lead
to avoidable financial loss but could also adversely affect delivery of services and could
affect the Council’s reputation.  The work carried out to identify and review the council’s
130

Page 131

top risks and to determine the risks controls and actions necessary enables the council
to manage the impact.   
16. Equality Impact Assessment and Consultation Arrangements
16.1. This report does not introduce a new policy, function or strategy or recommend a
fundamental change to an existing policy, function or strategy and, therefore, no
impact assessment is required. 
16.2. Consultation has taken place with Heads of Service, Risk Lead Officers, Elected
Members, Trade Unions and Resource Risk Sponsors. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
5 September 2024 
Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent 
Previous References
 Risk and Audit Scrutiny Committee – Review of Council’s Top Risks/Year End Risk
Management Report – 31 October 2023 
List of Background Papers
 Top Risk Control Cards 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions)
Ext:  4951 (Tel: 01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk
131

Page 132

Appendix 1 – 2023/2024 Compliance with risk management strategic requirements 
Key
Score 3= Up to date and in line with requirement 
Score 2= Work in progress 
Score 1= Needs addressed 
Requirement from Risk Management Strategy
Community
and
Enterprise
Resources
Education
Resources
Finance and
Corporate
Resources
Housing and
Technical
Resources
Social W
ork
Resources
Risk registers are updated on an annual basis, in line with the
council’s Risk Management Strategy 3 3 3 3 3
Where appropriate, council top risks are adequately reflected in the
Resource risk register 3 3 3 3 3
Delivery of Resource risk control actions and control actions for top
risks lead by the Resource are progressed. 3 3 3 3 3
The risk register and risk control plan are approved annually by the
Resource Management Team 3 3 3 3 3
The risk register is presented for noting; and assurance of delivery
of actions is given to the Resource Committee on an annual basis. 3 3 3 3 3
Information held on Figtree reflects the latest Resource Risk
Register and Risk Control Plan 3 3 3 3 3
The council’s agreed risk profile and risk tolerance level is adopted. 3 3 3 3 3
Risk evaluations are undertaken prior to the commencement of
major projects, partnerships and organisational changes 3 3 3 3 3
Formal risk sharing agreements for major partnerships and
contracts are in place 3 3 3 3 3
Major decisions are transparent and clearly show the following key
elements:
• Full cost over life of proposal;
• Funding source;
• Savings or efficiencies;
• Other benefits;
• Associated risks and how they will be managed.
3 3 3 3 3
Elected members are kept informed of risks by using the “Other
Implications” section of the Committee report template.  This section
should include:
• The risks involved with the report’s recommendations;
• The potential positive and negative consequences;
• How these risks are currently being managed (existing controls)
or how they will be managed going forward (additional actions);
• Link to risks on the council’s top risk register.
3 3 3 3 3
Assurance is gained from contractors and sub-contractors, in line
with procurement processes, of their adoption of recommended risk
management practices, particularly that adequate insurance cover,
safe health and safety practices, and equalities, sustainable
development, business continuity and scrutiny procedures are in
place.
3 3 3 3 3
Regular Resource Risk Management Group meetings (or alternative
where risk management is a standing agenda item). 3 3 3 3 3
Liaison with Service Planners to ensure that risks associated with
council and Resource plans are identified and assessed; and that
appropriate plans are put in place to manage these risks. 
3 3 3 3 3
Management of insurance hotspots and required mitigating actions 3 3 3 3 3
Total 45 45 45 45 45
Percentage compliance 100% 100% 100% 100% 100% 
132

Page 133

Appendix 2 – Council top risk register 2024/2025  
Risk
Category 
Key risk  Inherent
Risk
Score
Residual
Risk
Score
Controls
(Good,
adequate,
poor)
1 
Very  
High 
(15-25) 
The Budget Gap that the council is facing across the
medium term is the biggest risk faced by the Council. 
The Budget Gap is the result of the continued real
terms reduction in Government funding as well as
the increased demand and increased cost of
services including the significant impact of price
increases on areas such as inflationary increases on
utilities, and increased staff costs due to pay awards. 
Reduced fees/income received by the Council would
add to budget pressures across Services
25 20 Adequate
Inability of the council to effectively provide
accommodation and support to households who
are homeless and people who arrive in South
Lanarkshire as part of refugee resettlement and
the asylum seeker dispersal programmes
(including those for unaccompanied children)
25 20 Good
The council, in conjunction with its partners, is
unable to provide the required support to reducing
the overall impact of the costs of living crisis on
households in South Lanarkshire resulting in
increasing levels of poverty, debt, and poorer
outcomes for people 
25 20 Adequate
Inability to take the necessary action due to funding
constraints, to combat climate change, and work
toward achieving net zero carbon emissions by
2045, thereby contributing to negative and
irreversible environmental, social and economic
impacts on the council and its residents
25 20 Good
The council’s operations are affected by fraud,
theft, organised crime and cyber attacks 
25 20 Adequate
The council does not fully deliver the strategic
outcomes required of the IJB as outlined in their
Strategic Commissioning Plan 
25 20 Good
The council fails to comply with or meet the
expected standards of scrutiny and deliver the
improvement actions identified by regulatory bodies
25 20 Adequate
The provision of council services is disrupted
because of industrial action
20 16 Adequate
The council fails to comply with its statutory duties
by not conducting sufficiently robust impact
assessments where the same are required,
including in respect of budget/service redesign
proposals, leading to potential legal and financial
challenges, which could result in failure to deliver
those proposals
*  
20 16 Adequate
Inability to ensure public protection and safety 25 16 Good
The council inherits commercially unviable
shopping centres due to the financial failure of
existing owner/management companies resulting
20 16 Adequate
133

Page 134

in significant financial and operational liabilities
transferring to the council
*
Increasing levels of adverse weather  20 16 Good
2 
High 
(8-12) 
Failure to fulfil emergency response commitments
befitting the council’s status as a Category One
(emergency) responder 
25 12 Adequate
Due to the fragility and lack of capacity of the third
and private sector market, providers are potentially
unable to sustain their business models, which could
result in a deterioration of their service standards
and/or provider failure.  This could result in the
Council seeking alternative service provision in a
reduced marketplace to allow us to meet the demand
for services.
25 12 Good
The council does not have the appropriate
emergency / business continuity plans;
contingency arrangements or partnerships in
place to respond to/or recover from a
pandemic/endemic event. 
25 12 Good
Procurement activity is affected by supply chain
issues; a lack of resources; non-compliance or
legal challenge 
25 12 Good
Lack of capacity and skills to meet increased
service demands 
20 12 Good
Information governance not subject to adequate
control 
20 12 Adequate
Historic childhood abuse   16 12 Good
The council is materially affected by the
implications arising from the National Care
Service Bill 
16 12 Adequate
Implications of the Scottish Fire and Rescue
Service Unwanted Fire Alarm Signals Policy within
the council's non-domestic estate
25 9 Adequate
Inability to maintain infrastructure, assets and
properties in a well-maintained condition that will
avoid unplanned closure, due to budget
constraints and failure to achieve objectives of
asset and property reviews
20 9 Good
IT development, functionality and implementation
of new systems does not support service delivery
to secure efficiencies
20 9 Adequate
The council fails to deliver the objectives of the
Community Wealth Building Strategy 
20 9 Good
The council fails to deliver the outcomes of the
Economic Strategy
12 9 Adequate
Failure to ensure the health, safety and wellbeing
of employees and the protection of service users
and members of the public in the delivery of
council services 
20 8 Good
Failure to achieve the outcomes of the Community
Plan 2022-2032
20 8 Adequate
134

Page 135

Failure to achieve the outcomes of the Council
Plan 
16 8 Adequate
‘*’ indicates new risk added this year 
135

Page 136

Appendix 3: Risk Management Strategy 
South Lanarkshire Council 
Risk Management Strategy 
August 2024  
136

Page 137

South Lanarkshire Council
Risk Management Policy Statement 
South Lanarkshire Council is committed to undertaking practical risk management to maximise the
opportunities available and to minimise losses.   
The Council recognises that risk management is one of the principal elements of good governance
and a key contributor to ensuring a sound internal control environment. 
South Lanarkshire Council aims, through a systematic framework and process, to identify, evaluate,
manage and monitor all risks within its control to protect its employees, service users, assets, service
delivery, reputation, community and business partners. 
South Lanarkshire Council promotes an inclusive approach to managing risk through engaging with
Resources to embed, develop, challenge and support risk management activity within the Council.
The overall aim of this policy is to raise awareness of risk throughout the Council. 
Introduction from Chief Executive 
The risk environment in which the public sector operates has been the most unpredictable
and challenging in recent times and with the council embarking upon a wide ranging
transformational change programme, it is imperative that we assess and manage the risks
that come with such changes.   
Risk Management is an important element of our good governance arrangements and a key
contributor to sound internal control. 
More generally, risk management supports our Connect Outcomes. As an organisation, we
require to consider risk in all key decisions, as part of planning and budget setting processes,
and when we undertake new projects and initiatives. 
To be successful, we need to take risk, but need to ensure the risk that we carry is
appropriately managed and controlled, within acceptable tolerance levels. 
Paul Manning
Chief Executive 
137

Page 138

Introduction
South Lanarkshire Council’s Resources, Services and employees are encouraged to develop new
initiatives, improve performance and achieve goals safely, effectively and efficiently through the
application of good risk management practice. 
For consistency throughout the Council, Resources are required to ensure that the systematic
management of risks and opportunities is embedded in service planning and delivery; in the way they
make decisions; in major projects; and in their dealings with partners and contractors. 
This strategy describes the specific risk management techniques and standards to be applied and the
responsibilities for achieving effective risk management. 
The strategy aims to provide a sensible and proportionate approach to risk management that promotes
awareness rather than avoidance. 
The Council seeks to promote an environment that is risk aware and strives to place risk
management at the heart of key decisions. Applying a systematic risk management process will
encourage:
• reasonable risk-taking in order to make service improvements and enable positive outcomes;
• the implementation of mitigating control measures to avoid or reduce the impact of losses and
deterioration in services;
• the preparation and testing of business continuity plans for responding to emergency events. 
Risk management is an integral part of all that we do and is key to the success of the Council.   
Definition of risk
A risk is something which creates uncertainty and could prevent the Council, or our community and
business partners, from achieving our Connect Outcomes; or which might detract from the successful
delivery of our services. 
A risk is also an opportunity which is taken in order to improve services or efficiency.   
A risk can, therefore, be a positive opportunity or a negative threat. 
Risks can affect all Council services, our assets, employees, reputation, and our dealings with our
community and business partners. 
Risk management aims and objectives
We aim to: 
• integrate risk management into how we run the Council, ensuring risk management forms part of
key decisions; 
• support reasonable risk taking in a balanced way, giving consideration to the level of risk, reward,
impact and cost of control measures;
• clearly identify all significant risks we face, prioritise these and ensure they are managed within
set tolerance levels;
• safeguard Council employees, assets and reputation;
• achieve best value by ensuring more efficient use of resources;
• ensure risk management is a key and effective element of our Corporate Governance
arrangements, through more informed, transparent and accountable decision making;
• develop awareness throughout the Council, to allow practical implementation of the risk
management methodology;
• ensure the Council operates within the requirements of the law; 
• share risk information through all areas of the Council to aid effective risk management and
encourage best practice;
• acknowledge that even with good risk management arrangements and best endeavours, things
can go wrong; 
138

Page 139

• learn from previous experiences, both good and bad, putting into practice what has been learned,
ensuring  that where necessary, steps are taken to reduce the likelihood of adverse events
occurring again;
• exploit opportunities. 
Risk Management - measures of success
The measures of success for this strategy will be:
• successful delivery of the Council Plan, Connect;
• successful outcomes from external scrutiny;
• fewer unexpected/unanticipated problems;
• fewer incidents/accidents/complaints;
• fewer claims/less litigation;
• successfully taking advantage of opportunities;
• maintaining a positive reputation for the Council.
Risk management application
The process of risk management does not seek to fully eliminate all risks, rather it aims to reduce risk
to an appropriate level with which the organisation is comfortable, without preventing development.
Good risk management is, therefore, about being risk aware and not risk averse. 
Management of risk must be carried out in a systematic manner and should be applied at both
strategic and operational levels throughout the organisation. It should be practiced at all times but is
especially important and must be considered: 
• during periods of major change;
• prior to undertaking projects/as part of a project management system;
• when entering into partnerships;
• when setting budgets;
• when amending structures;
• as part of Procurement exercises;
• when undertaking service reviews;
• following political change;
• as part of strategic planning/decision making process. 
Risk management and the strategic planning process
To successfully manage risk, Connect Outcomes and Resource plan actions and measures must
inform the Council’s risk management arrangements and vice versa.  For this to occur, it is important
that the arrangements for risk management are comprehensive enough to reflect the business of the
Council as detailed within the Council Plan, Connect and individual Resource Plans. 
At a strategic level, the Council reviews its top risks each year and this contributes to the content of
the annual Internal Audit plan.   
At a Resource level, Resource risk registers should be reviewed and updated following preparation of
the annual Resource Plan.  Risk registers must reflect the work of the Resource.  To achieve this, the
updated risk register must accurately reflect the content of the Resource Plan including details of risk
controls and actions. 
Resource risk registers should be reviewed following the review of the Council’s top risks to ensure that
any top risks that affect the Resource are adequately reflected. Resource risk registers are also
considered as part of the Council’s top risk review process. This ensures the process is both top down
and bottom up. 
139

Page 140

Roles and responsibilities
Risk management roles and responsibilities are as follows:- 
Roles and responsibilities
The Chief Executive and
the Corporate
Management Team
(CMT) will:
• Ensure that risk management is embedded at all levels
throughout the Council;
• Prioritise and manage strategic risks and monitor those risks
that are relevant to Council Plans and Policies.
Executive Directors will: • Appoint a Resource Risk Sponsor and establish a Resource
Risk Management Group (or alternative where risk
management is a standing agenda item);
• Evidence assurance of sound risk management within their
Annual Governance Statement.
The Executive Director –
Finance and Corporate
Resources will:
• Champion risk management activity in the Council;
• Organise reports on relevant risk management arrangements to the
Risk and Audit Scrutiny Committee, the Finance and Corporate
Resources Committee and the Executive Committee.
The Head of Finance
(Transactions), Finance
Services, Finance and
Corporate Resources
will:
• Co-ordinate the Council’s strategic risk management arrangements;
• Provide periodic reports to the CMT and elected members on risk
management arrangements.
The Insurance and Risk
Management Adviser,
Finance Services,
Finance and Corporate
Resources will:
• Liaise with Resources in the implementation and embedding of their
risk management arrangements;
• Offer advice and support to service managers and other groups in
the management of operational and strategic risks;
• Maintain a Risk Register for the Council;
• Prepare reports on risk management and insured risks;
• Drive forward risk management training, and support risk
management initiatives; 
• Be aware of developments within insurance and risk management
and share knowledge;
• Prepare specific risk management guidance material;
• Monitor the performance of Resources in meeting the requirements
of the Risk Management Strategy.
Audit and Compliance
Manager, Finance and
Corporate Resources
• Create an Audit Plan that is aligned to the Council’s top risks;
• Review/challenge the effectiveness of the Council’s risk
management arrangements;
• Test and validate existing control measures
• Provide Resources support and guidance on the three lines
model for categorising control measures
The Corporate Risk
Sponsors Group will:
• Develop, challenge and support risk management activity at
Resource and Corporate levels;
• Advise and provide support to the CMT and lead officers on
the management of risks and risk management processes;
• Identify, analyse and discuss emerging risks resulting in
provision of advice on opportunities and mitigation;
• Lead new risk management initiatives;
• Communicate the need to manage risk and share good
practice;
• Review risk management training materials and develop
opportunities for dissemination of best risk management
practice in Resources;
140

Page 141

• Review and prioritise the Council’s top risk register, co-
ordinating the results for risk reporting and monitoring;
• Prepare and deliver the annual risk management work plan.
Resource Risk Sponsors
will:
• Lead their Resource Risk Management Group;
• Facilitate the update of their Resource risk register and risk
control plan;
• Progress delivery of Resource risk control actions and control
actions for top risks led by their Resource;
• Prepare an annual progress report for their Resource Senior
Management Team and their Resource Committee;
• Participate in self evaluation of the risk management process
and progress within their Resource;
• Liaise with Service Planners to ensure that risks associated
with Council and Resource plans are identified and that
appropriate plans are in place to manage these risks.
Resource Risk Groups
will:
• Consider and evaluate new risks to delivery of services; 
• Inform targeted risk management initiatives for the Resource;
• Promote the management of risk at appropriate forums;
• Manage Resource insurance hotspots and required mitigating
actions.
Heads of Service;
Resource Management
Teams; and Senior
Managers will:
• Take actions to deliver the Risk Management Strategy in their area
of responsibility particularly promoting risk awareness in decision
making; 
• Ensure risks are appropriately managed and that employees receive
appropriate training;
• Monitor operational risk management;
• Input to the identification and management of top Council risks;
• Provide assurance to elected members, by using the Other
Implications section within reports, that risks associated with
proposed plans have been evaluated and mitigated against.
Operational Managers
will:
• Organise training and raise awareness for employees, as relevant,
to ensure risks are identified and control measures are put in place
and monitored;
• Make risk based decisions when delivering services;
• Provide assurance to elected members, by using the Other
Implications section within reports, that risks associated with
proposed plans have been evaluated and mitigated against.
Lead Officers for specific
priorities, projects and/or
partnerships highlighted
in Council and
Community Plans will:
• Ensure risks are identified, recorded and managed for the projects
and partnerships under their leadership (Refer to guidance:
Managing Risk in Partnerships).
• Ensure that their Risk Sponsor is kept up to date with the level of
risk and control.
The Risk and Audit
Scrutiny Committee
(RASC) will:
• Provide assurance to elected members that the Council’s risks are
being appropriately managed;
• Promote the understanding of risk among elected members and the
benefits of risk management as well as monitoring the Council’s
internal controls;
• Seek assurance of sound risk control.
Elected Members will: • Oversee the effective management of risk by officers of the Council;
• Be supported in this role by the RASC.
All employees will: • Be bound by the “Seven Principles of Public Life” detailed within the
Council’s Code of Conduct for Employees;
• Advise their line manager of any risks that they become aware of
when undertaking their duties
141

Page 142

Risk management structure
The main responsibility for implementing the Risk Management Strategy will lie with the nominated
Risk Sponsors in each Resource. The Insurance and Risk Management Adviser has a key role in
raising awareness and supporting the Resource Risk Sponsors. 
Resource Risk Groups and various other groups will undertake risk related activities at Resource and
Service level, within projects, corporately and within Community groups and partnerships. 
Resource Risk Sponsors will report progress to Risk Management, the corporate Risk Sponsors
Group and to their own Resource Management Team. 
The following diagram shows the structure of managing risk management activity in South
Lanarkshire Council: 
Risk and Audit
Scrutiny Committee
Corporate
Management Team
Executive 
Committee
Executive Director –
Finance and Corporate
Resources
Head of Finance
Services
(Transactions)
Risk Management  Risk Sponsors
Insurance and Risk
Management Adviser,
Finance and Corporate
Resources
Resource Risk
Management
Groups
Resource
Committees
Local Management Resource
Management Teams
Employees
142

Page 143

Methodology
A methodology for managing risk in South Lanarkshire Council has been established and will be
universally applied. A copy is attached at Appendix Three. 
Techniques in using and applying the methodology will differ, depending on the project or service
area and the impact it is likely to have on delivery of  Connect Outcomes. The treatment of risk will
depend on ownership, availability of insurance cover, cost of mitigation and level of concern. 
Risk registers and risk control plans will be used to share information, reduce duplication of effort in
managing risks and to build up an overall risk profile of the Council. The risk profile will be monitored
and the level of exposure reported as appropriate.   
Risk tolerance
South Lanarkshire Council aims to be risk embracing, that is it will accept a tolerable level of risk in
seeking opportunities, service efficiencies and in agreeing control measures. The level of risk facing
the Council is measured both before (inherent risk) and after (residual risk) consideration of controls. 
The Council should never carry a high residual risk exposure as this would indicate instability but a
low residual risk exposure should also be avoided as this indicates lack of innovation. 
It is generally understood that in normal circumstances:
• Low risk is acceptable without any further action to prevent or mitigate the risk (risk category
4);
• Medium risk is tolerable – control measures implemented or introduced must be cost effective
(risk category 3);
• High risk may be tolerable – providing the Council is assured regarding the adequacy and
effectiveness of the control measures in place.  Any further control measures implemented or
introduced must be cost effective in relation to the high risk (risk category 2);
• Very high risk is deemed to be unacceptable and measures should be taken to terminate,
transfer or treat a very high risk to a more tolerable position (risk category 1), 
It is recognised that in exceptional circumstances that factors will combine to produce a very high risk
for which the Council has limited control over (for example impact of demographic change). 
Recognising this scenario, and taking into account the inherent level of risk experienced in some
Resources, the Council may have the capacity to deal with some very high risk, it does not wish to
tolerate any more than 20 per cent of risks at a very high level at any given time. 
South Lanarkshire Council’s ideal risk exposure should be consistent with an acceptable tolerance of:
• no more than 20 per cent of risks at a very high level;
• no more than 25 per cent of risks at a high level
• around 40 to 50 per cent of risks at a medium level;
• no more than 25 per cent of risks at a low level 
It is always important to consider how proportionate your response to risk is, ensuring that the risk is
continually evaluated to the lowest level that is reasonably practical whilst considering the net
benefits, that is to a level where it is believed the cost of action will give the desired benefit without
becoming risk averse. 
Risk financing 
Insurance, broking and loss adjusters’ contracts will be subject to regular competitive tendering to
ensure best value. 
Legitimate insurable losses will be financed through purchased insurance covers and a self insurance
fund. Regular professional advice will be sought on the optimum balance between bought and self
insurance. 
The Risk Management team will manage the self insurance fund, following recognised insurance
principles and standards.  
143

Page 144

The self insurance fund will be subject to regular actuarial review and approved accounting practices. 
Core requirements and outcomes
Appropriate and effective risk management will be embraced by all Council Resources as an enabler
of success, whether for maximising opportunities, delivering innovation and best value, increasing
performance or managing significant challenges. 
All Resources, major partnerships and projects will be required to meet the following minimum
requirements:
• that a register of risks must be approved by the Resource Management Team and presented for
noting to Resource Committees once per annum;
• that a risk control plan must be approved by the Resource Management Team and assurance of
delivery of actions given to Committee once per annum;
• that, where appropriate, the Council’s top risks are reflected within Resource risk registers
• that documented evidence of risk evaluation prior to the commencement of major projects,
partnerships and organisational changes is completed;
• that formal risk sharing agreements for major partnerships and contracts are put in place;
• that when major decisions are taken, they are transparent and clearly show the following key
elements:
➢ full cost over life of proposal;
➢ funding source;
➢ savings or efficiencies;
➢ other benefits;
➢ associated risks and how they will be managed.
• that Elected Members are to be kept informed of risks by using the “Other Implications” section of
the Committee report template.  This section should include:
➢ the risks involved with the report’s recommendations;
➢ the potential positive and negative consequences;
➢ how these risks are currently being managed (existing controls) or how they will be
managed going forward (additional actions);
➢ link to risks on the Council’s top risk register.
• that assurance is gained from contractors and sub contractors, in line with procurement processes, 
of their adoption of recommended risk management practices, particularly that adequate insurance
cover, safe health and safety practices, and equalities, sustainable development, business
continuity and scrutiny procedures are in place;
• that the corporate risk management IT system is used to record and monitor risks and actions
• assurance that risks are being managed is provided annually to the Chair of the Resource
Committee and the Chief Executive as part of the Council’s governance framework;
• that the Council’s agreed risk profile and risk tolerance level is adopted. 
Reports for projects and partnerships risk registers and action plans should be presented to the
relevant board. 
Delivery of core requirements will ensure that the benefits outlined in the Strategy are recognised by
insurers, auditors and members of the Community with the primary outcome being a well governed
and high performing Council. 
Monitoring and reporting
Management information for insured risks, including claims experiences, in terms of numbers and
value, is used to inform the CMT of the Council’s losses and to identify hotspot areas where further
targeted action is required. Changes in the level of risk are tracked by analysing trends. 
The CMT has overall responsibility to monitor Resources progress against the Risk Management
Strategy. 
144

Page 145

Regular reports will be prepared by the Risk Management team. Regular re-evaluation of risks will
enable the risk exposure and effectiveness of initiatives to be tracked and reported. 
The RASC will oversee the effective management of risk through presentation of regular reports and
discussion of issues arising. 
Risk management performance will be measured by reviews against standards, use of local and
national insurance performance indicators and where possible benchmarking with other authorities. 
Reporting requirements and responsibilities are outlined in Table One.
145

Page 146

Table One - Risk Management reporting requirements
Report title Purpose of report Report
prepared by
Frequency
of report
Reported to
Executive
Committee
Corporate
Managem
ent Team
Risk and
Audit
Scrutiny
Committee
Resource
Senior
Management
Teams
Resource
Committees
Year-end insured
risks report
To highlight the number and estimated costs of insured
losses as at 31 March. 
To identify actions and progress for insurance hotspot areas
Risk
Management
Annual 
   
Risk Management
year- end report
To advise Resources compliance with the Risk
Management Strategy 
To seek approval and to provide an update on progress
made in delivering actions in the risk management work
plan 
To provide an update on progress made on delivering risk
control actions.
Risk
Management 
Annual 
   
Review of the
Council’s top risks
To update top risk areas for the Council and seek approval
for exposure levels
Risk
Management
Annual     
Update of the
Resource Risk
Register and Risk
Control Plan
To seek approval for Resource risk registers and risk control
plans
Resource
Risk Sponsor
Annual   
 
Review of the Risk
Management
Strategy
To seek approval for updates made to the Strategy Risk
Management
Following
each
review of
the
Strategy 
    
146

Page 147

Risk Management Methodology 
Introduction
The risk management process is a continuous and developing process involving the identification of
risks; analysis and prioritisation of these risks; and the implementation of actions to further mitigate
risks.   
Within South Lanarkshire Council, risk management is a four stage process: 
Risk identification
Risks can be identified through a number of channels:
• Council, Resource and Service planning processes
• Risk sponsors meetings
• Risk Identification Workshops
• SWOT Analysis
• Regular Resource risk management group meetings
• Project/Partnership meetings
• In the course of normal operational business
• During periods of emergency/crisis management 
All identified risks should be aligned to Connect Outcomes. 
When describing a risk always it should be presented in three parts:
• The root cause (weakness)
• The trigger (initiating event or action) 
• And the impact (consequence) 
Step 1
Risk Identification
Step 2
Analyse and
assess/evaluate risks
Step 3
Identify controls;
effectiveness; and 
Further actions 
Step 4
Record, monitor and
report
Connect Outcomes 
Resource Plan Actions
and Measures
147

Page 148

It is important to ensure risk descriptions are brief but fully communicate the risk in question.   The
following wording groups are often used to begin the process of articulating risk: 
Failure to …..    Reduction of …..
Loss of …..    Disruption to …..
Inability to …..    Increase in …..
Inappropriate …..   Lack of …..
Exploitation of …..   Realisation that …..
Enhancement of …..   Empowerment of ….. 
All risks should be categorised for the purpose of analysis.  The Council’s risk categories are:
• Assets
• Reputation
• Operational continuity and performance
• Financial
• Political
• Environmental
• IT
• Regulatory and legislative
• People 
Evaluation of risks - inherent
Risks should be evaluated, initially without regard to any mitigation or controls that are already in place 
It is a twofold evaluation, which considers both the impact and likelihood of the risk. 
Definitions of likelihood and impact are detailed below, but these may vary depending on the project or
partnership, where analysis requires to be more specific. 
Likelihood is scored on a scale of one to five, with one being the lowest.  Descriptions of the scores are
as follows: 
Score 1 2 3 4 5
Description Rare   Unlikely  Possible  Likely Almost
certain 
Likelihood of
occurrence
1 in 10 years 1 in 3 years 1 in 2 years Annually Monthly
Probability of
occurrence
The event may
occur in certain
circumstances
The event
could occur
The event may
occur
The event
will
probably
occur
The event is
expected to
occur or
occurs
regularly 
Impact is also scored on a scale of one-five, with one being the lowest.  Descriptions of the scores are
as follows: 
The following descriptions are provided to assist in ensuring greater consistency when scoring the
potential impact of specific types of risks: 
148

Page 149

Reputation Financial Service delivery/
Time to recover
Compliance Safety
1
Negligible
Public
concern
restricted to
local
complaints
<£50,000
per annum
No impact to service
quality; limited
disruption to operations.
No external
interest
Minor injury
– no lost
time
2
Minor
Minor
adverse
local/public/m
edia attention
and
complaints
£50,000-
£250,000
per annum
Minor impact to service
quality; minor service
standards are not met;
short term 
Very minor
attention from
legislative
/regulatory
body
Minor injury
– resulting
in lost time
3
Moderate
Adverse
national
media
Public
attention
£250,000
to
£500,000
per annum
Significant fall in service
quality; major
partnership relationships
strained; serious
disruption in service
standards
Short-term
attention from
legislative/
regulatory
body 
Major injury
or ill health
resulting in
lost time
4
Major
Serious
negative
national or
regional
criticism
£500,000
to
£1million
per annum
Major impact to service
delivery; multiple service
standards are not met;
long term disruption to
operations; multiple
partnerships affected
Medium-term
attention from
legislative/
regulatory
body 
Fatality;
Or injuries
to several
people
5
Catastrophic
Prolonged
international,
regional and
national
condemnation
>£1million
per annum
Catastrophic fail in
service quality and key
service standards are
not met; long term
catastrophic interruption
to operations; several
major partnerships are
affected
National
impact with
rapid
intervention of
legislative/
regulatory
body 
Multiple
fatalities; Or
injuries to
large
number of
people 
The assessments for impact and likelihood combine to provide an overall inherent risk score on the
scale of between 1 and 25, using the Council’s recognised risk matrix. 
Risk matrix 
Likelihood
5
Almost
Certain
5 10 15 20 25
4
Likely 4 8 12 16 20
3
Possible 3 6 9 12 15
2
Unlikely 2 4 6 8 10
1
Rare 1 2 3 4 5  
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
149

Page 150

The risk score is calculated as follows: 
Likelihood score x Impact score = Risk Score 
These scores should be recorded in the relevant columns of the risk register. 
Risk Categories/Rating 
Risk Category Risk Rating Risk Score
1 Very high 20-25
2 High 10-16
3 Medium 5-9
4 Low 1-4 
The information gathered at the risk identification stage should be used to compile an initial risk
register. 
Risk control
For every risk, controls that reduce the impact and likelihood should be identified and noted in the risk
register. 
Examples of controls are:
• Policies and procedures
• Information, instruction and training
• Physical security measures
• Scrutiny measures
• Communication processes 
Three Lines Model
Controls that mitigate top risks will be categorised using the ‘three lines’ model developed by the
Institute of Internal Auditors.  This aims to provide assurance around the adequacy of control measures
that are in place to mitigate strategic risks, identify control descriptions that need amendment to clearly
link these to the mitigation of the risk and to highlight any residual gaps in controls that require to be
addressed.   
1. The first line of defence (functions that own and manage risks)
This is formed by managers and staff who are responsible for identifying and managing risk as part
of their accountability for achieving objectives. Collectively, they should have the necessary
knowledge, skills, information, and authority to operate the relevant policies and procedures of risk
control. This requires an understanding of the organisation, its objectives, the environment in which
it operates, and the risks it faces. 
Examples include:
• Management controls
• Internal control measures 
2. The second line of defence (functions that oversee or who specialise in compliance or the
management of risk)
This provides the policies, frameworks, tools, techniques and support to enable risk and compliance
to be managed in the first line, conducts monitoring to assess effectiveness and supports
consistency of definitions and measurement of risk. 
Examples Include:
• Resource Management Teams 
• Risk Management
• Finance Services 
• Security Adviser/IT Security Manager
• Corporate Health & Safety
• Internal Inspection/Compliance Teams 
150

Page 151

3. The third line of defence (functions that provide independent assurance)
This is provided by internal audit. Sitting outside the risk management processes of the first two
lines of defence, its main roles are to ensure that the first two lines are operating effectively and
advise how they could be improved. Tasked by, and reporting to senior management and the audit
committee, it provides an evaluation, through a risk-based approach, on the effectiveness of the
governance, risk management, and internal control framework within the organisation. It can also
give assurance to sector regulators and external auditors that appropriate controls and processes
are in place and are operating effectively. 
The diagram below sets out the relationships between functions and how responsibilities are divided. 
A Full briefing on how to implement the Three Lines Model within Resources is available from:  ADD
LINK 
Effectiveness of control measures
It is the responsibility of the risk owner/identifier to assess the effectiveness of the control measures
that are already in place. 
Three opinions exist - poor, adequate and good.  See table below for examples: 
Poor
(Not effective)
Adequate
(Partially effective)
Good
(Completely effective)
Insufficient controls; weak
procedures; limited attempt
made to implement
preventative measures;
controls not working as
intended.
Reasonable compliance
with statutory requirements;
reasonable standards
established; some
preventative measures in
place; controls can be
improved.
Full compliance with
statutory requirements;
comprehensive procedures
in place; no other controls
considered necessary;
ongoing monitoring only. 
If it is considered that the existing controls are adequate or poor, it is likely that further control
measures will require to be implemented. 
After consideration of the controls that are already in place, a decision on the treatment of the risk
needs to be made.  There are four options - transfer, reject, accept and mitigate.  See below: 
Transfer Reject Accept Mitigate
This involves
transferring the cost
of risk to a third
party
This implies that a
risk is undesirable,
e.g. it offers
unattractive awards,
it is outside of the
risk appetite, or
The Council decides
to accept the risk as
it is and do nothing
further to mitigate it.
This involves putting
in place risk control
measures that
reduce the likelihood
and/or the
consequences of the
Corporate Management Team
Elected Members
External Audit
Regulator 
first line 
(functions that own and
manage risks) 
Second line 
(functions that oversee or
who specialise in compliance
or the management of risk) 
Third line 
(functions that provide
independent assurance) 
151

Page 152

there is no capability
to manage the risk
risk to acceptable
levels. 
• Insurable • Cancel planned
project; work;
etc.
• Cannot control –
maintain a
watching brief
• Some further
action required
to mitigate the
risk.
• Not the Council’s
responsibility
• Change
operation
• Already
adequately
controlled
• Existing Controls
need tightened/
improved
• Pass to contractor  • Cost of control
outweighs benefit 
For risks which require mitigation, a risk control plan should be prepared.  This should contain the
following information:
• Details of the risk
• The action that is to be completed
• Who is responsible for ensuring completion
• Target date for completion of the action 
After preparation of the risk control plan and consideration of the controls already in place, the risk is
rescored as if all current controls were in place and working.  This results in the residual risk score. 
This re-evaluation uses the same method as the inherent evaluation. 
A copy of the Council’s risk card that should be used to record the details of the risk is attached at
Appendix One. 
Monitoring
It is essential for risk management success that periodic review and monitoring of risks, controls and
actions is in place. 
Risks should be updated if there are changes to the risk, and when further control measures are put in
place when actions are completed. 
When reporting on the progress of the completion of risk control actions, the following statuses should
used: 
Status Definition
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall against
target
Red There has been major slippage against timescale or major shortfall against
target
Report later The information is not yet available to allow us to say whether the target has
been reached or not. These will be reported when available  
152

Page 153

Appendix One – Risk Card 
Key Risk: 
Risk description Root cause 
Trigger   
Impact 
Classification 
Connect Outcome: 
Head of Service  Lead
Officer 
Lead Resource  Resources affected 
Inherent impact:  Inherent
likelihood:  Inherent risk score: 
Existing Control Measures:
First line of defence – functions that own and manage risk (operational/day to day management)
1 
2 
3 
Second line of defence – assurance by corporate functions (not internal audit) that oversee or who
specialise in compliance or the management of risk 
4 
5 
6 
Third line of defence – functions that provide independent assurance (Internal Audit)
7 
8 
9 
Assessment of
effectiveness of
existing control
measures:
Poor/Adequate/Good 
Risk treatment Transfer/Reject/Accept/Mitigate
Residual impact:  Residual
likelihood:  Residual risk score: 
Action Plan  (Additional control measures required to mitigate the risk) 
Action: Responsible
person:
Target
completion date:
1  
2  
3  
153

Page 154

Appendix Two - Risk management glossary
Key definitions 
Control Any action, procedure or operation undertaken to either contain a risk to
an acceptable level, or to increase the probability of a desired outcome.
Down-side risk A risk with a negative or unfavourable impact.
Impact Impact or consequence to the Council should the risk materialise
Inherent risk score The level of risk existing before any control measures have been put in
place.
Likelihood Used as a qualitative description of probability or frequency of that risk
actually materialising.
Mitigation The limitation of any negative impact of a particular event.
Operational risk Risks associated with the day-to-day issues that the Council is confronted
with as we strive to deliver our actions and outcomes,
Residual risk score The level of risk remaining after control measures have been taken into
consideration
Risk The chance of something happening that will have an impact upon
objectives.  It is measured in terms of impact and likelihood.
Risk Appetite The amount of risk that the Council is willing to take
Risk analysis A systematic use of available information to determine how often specified
events may occur and the magnitude of their consequences.
Risk assessment The overall process of risk analysis and risk evaluation.
Risk communication The exchange or sharing of information about risk between the decision
maker and other shareholders.
Risk control The part of risk management which involves the provision of policies,
standards and procedures, initiatives and actions to eliminate risk or
minimise adverse risks.
Risk control plan A list of all the proposed actions to be undertaken to mitigate risks.  The
control plan should contain details of the person who is responsible for
implementation and a target completion date. 
Risk evaluation The process used to determine risk management priorities by comparing
the level of risk against pre-determined standards for impact and
likelihood, target risk levels or other criteria.
Risk financing The provision of funds to meet the cost of implementing risk treatment and
related costs.
Risk identification The process of determining what can happen, why and how.
Risk management  The culture, processes and structures that are directed towards the
effective management of potential opportunities and adverse effects.
Risk register A product used to maintain information on all the identified risks pertaining
to a particular activity, project or partnership.  Also known as the risk log.
Risk tolerance The range of exposure that is judged to be tolerable for the Council.
Risk treatment Selection and implementation of appropriate options for dealing with risk.
Stakeholders Those individuals and organisations who may affect, be affected by, or
perceive themselves to be affected by, the decision or activity.
Strategic risk Risks concerned with where the Council wants to go, and how we plan to
get there.
Up-side
risk/Opportunities
A risk with a positive or favourable impact. 
If you need this information in another language or format, please contact us to discuss how we can
best meet your needs. 
Phone: 01698 453886
Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk 
154

Page 155

Report
Agenda Item 
Report to: Risk and Audit Scrutiny Committee
Date of Meeting: 24 September 2024 
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Forward Programme for Future Meetings 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the forward programme for the meetings of the Risk and Audit
Scrutiny Committee to 30 September 2025
 invite members to suggest topics for inclusion in the Committee’s forward
programme
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the report and the outline forward programme for the meetings of the Risk
and Audit Scrutiny Committee to 30 September 2025, attached as an
Appendix to the report, be noted.
[1recs]
3. Background
3.1. As part of a range of improvement measures introduced as a result of Audit
Scotland’s report on the Audit of Best Value and Community Planning (2009), an
Action Plan was prepared.  One of the actions was to include, as a standard agenda
item, a list of items proposed for consideration at subsequent meetings of this
Committee to provide an opportunity for members to inform future agendas.  The
outline forward programme to 30 September 2025 is attached, for members’
information, as an Appendix to the report.  
4. Employee Implications
4.1. There are no employee implications. 
5. Financial Implications
5.1. There are no financial implications. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability or Environmental implications in terms
of the information contained within this report. 
7. Other Implications 
7.1. There are no risk implications in terms of the information contained within this report.
12
155

Page 156

8. Equality Impact Assessment and Consultation Arrangements
8.1. The report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
26 August 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee 8 July 2009 
List of Background Papers
 Audit Scotland Audit of Best Value and Community Planning 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elizabeth-Anne McGonigle, Administration Adviser
Tel:  0738 5403101
E-mail:-  elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
156

Page 157

APPENDIX – RASC OUTLINE FORWARD PROGRAMME 
Meeting Date Item Responsibility   
19 November 2024 Internal Audit Activity Report Audit and Compliance
Manager   
Audit Scotland: The National Fraud
Initiative in Scotland 2022
Audit and Compliance
Manager   
Audit Scotland Report – Local
Government in Scotland 2023
Head of Communications
and Strategy   
18 February 2025 Internal Audit Activity Report Audit and Compliance
Manager   
Performance and Review Scrutiny
Forum Annual Update
Head of Communications
and Strategy   
2025/2026 Internal Audit Plan Audit and Compliance
Manager   
Fraud Statistics Six Monthly
Update 2024/2025 
Audit and Compliance
Manager 
Good Governance Update Head of Administration and
Legal Services 
Annual Audit Plan External Audit   
Meeting Date Item Responsibility
6 May 2025 Internal Audit Activity Report Audit and Compliance
Manager   
Audit Scotland – Financial Bulletin
2023/2024
Head of Finance (Strategy)   
Financial Resources Scrutiny
Forum Activity
Head of Finance (Strategy)   
25 June 2025 Internal Audit Assurance Report
2024/2025
Audit and Compliance
Manager   
Annual Governance Statement for
2024/2025 and Significant
Governance Areas Quarter 4
Progress Report 
Audit Scotland: Best Value
Thematic Report
Head of Administration and
Legal Services 
External Audit   
157

Page 158

Unaudited Annual Accounts
2024/2025
Head of Finance (Strategy)   
Interim Management Report External Audit   
Internal Audit Activity Report Audit and Compliance
Manager
30 September 2025 External Auditor’s Annual Report to
South Lanarkshire Council
2024/2025
External Audit   
Audited Annual Accounts
2024/2025
Head of Finance (Strategy)   
Internal Audit Activity Report Audit and Compliance
Manager   
2023 NFI Exercise Audit and Compliance
Manager   
Year End Insured Risks Report
2024/2025 
Head of Finance
(Transactions) 
Year End Risk Management Report
2024/2025 and Review of Council’s
Top Risks 2025/2026
Head of Finance
(Transactions)  
Fraud Statistics Annual Report
2024/2025 
Audit and Compliance
Manager   
N.B:- Audit Scotland national studies and reviews will appear as a recurring item but the
frequency and subject matter will vary according to their programme. 