Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 03 October 2022 
Dear Councillor 
Planning Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 11 October 2022
Time:  10:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Richard Nelson (Chair), Gerry Convery (Depute Chair), Joe Fagan (ex officio), Alex Allison, Ralph
Barker, Archie Buchanan, Ross Clark, Margaret Cowie, Maureen Devlin, Mary Donnelly, Gladys
Ferguson-Miller, Elise Frame, Alistair Fulton, Celine Handibode, Mark Horsham, Ross Lambie,
Monique McAdams, Lesley McDonald, Davie McLachlan, Norman Rae, John Ross, Dr Ali Salamati,
Graham Scott, David Shearer, Helen Toner, David Watson 
Substitutes
Walter Brogan, Robert Brown, Mathew Buchanan, Margaret Cooper, Poppy Corbett, Allan Falconer,
Grant Ferguson, Graeme Horne, Martin Hose, Julia Marrs, Ian McAllan, Kenny McCreary, Bert
Thomson
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Planning Committee held on 13 September 2022
submitted for approval as a correct record.  (Copy attached) 
5 - 10 
Item(s) for Decision 
3 Application P/21/2167 for Change of Use of After School Care Facility to
Class 1 Retail Premises and Associated External Alterations at Cruse
House, 20 Argyle Drive, Hamilton
Report dated 3 October 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
11 - 24 
4 Application P/21/0521 for Erection of 3 Car Garage and Store with
Vehicular Access From Moss Road at 9 Newton Road Strathaven
Report dated 29 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
25 - 36 
5 Application P/22/0471 for Erection of Domestic Wind Turbine at 1 Fernhill
Grange, Bothwell
Report dated 29 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
37 - 54 
6 Application P/21/2093 for Erection of 37 Houses and 16 Flats with
Associated Roads, Landscaping and Infrastructure (Approval of Matters
Specified in Conditions Imposed on Consent HM/10/0052) at Land to the
North of Meikle Earnock Road, Meikle Earnock Road, Hamilton
Report dated 30 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
55 - 66 
7 Application P/21/1811 for Residential Development (153 Units) with
Associated Roundabout, Roads, Landscaping and SUDS (Relating to
Consent HM/10/0052) at Land West of Strathaven Road, Strathaven Road,
Hamilton
Report dated 30 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
67 - 82 
8 Application P/21/1812 for Residential Development (628 Units) with
Associated Roads, Landscaping and SUDS (Approval of Matters Specified
in Conditions Imposed on Consent HM/10/0052 - Namely Conditions 2, 5, 6,
8, 9, 10, 11, 13, 14, 15, 16, 17, 18, 19, 20 and 22) at Land to the West of
Strathaven Road, Strathaven Road, Hamilton
Report dated 3 October 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
83 - 100 
9 Application P/21/1582 for Substitution of Flats with Houses, Amendment to
Plot 24 to Provide 14 Semi-Detached and Terraced Houses, Alteration to
Cycle Track Alignment and Proposed Culvert of Section of Existing Burn
to Replace Footbridge (Amendment to Consents CR/16/0138 and
P/20/1729) at Land 145 Metres Southwest of 7 Dechmont Cottages,
Gilbertfield Road, Cambuslang
Report dated 30 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
101 - 120
2

Page 3

10  Application P/21/1962 for Substitution of House Types, Amendment to
SUDS Proposals, Addition of Sub-Station, Addition of Gas Governor and
Alteration of Cycle Path Alignment (Amendment to Consent CR/17/0039) at
Land 180 Metres Northwest of Dalton School Lodge, Gilbertfield Road,
Cambuslang
Report dated 30 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
121 - 140 
11  Application P/21/2031 for Substitution of House Types and Additional 6
Houses, Amendment to SUDS Proposals, Addition of Sub-Station,
Addition of Gas Governor and Alteration of Cycle Path Alignment
(Amendment to Consent CR/17/0076) at Phase 2D, Land 180 Metres
Northwest of Dalton School Lodge, Gilbertfield Road, Cambuslang
Report dated 30 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
141 - 160 
12  Application P/22/0674 for Installation of Battery Storage Facility (Section
36 Scottish Government Consultation) at Land 700 Metres North of Birkhill
Mill, Cairnhouses Road, Douglas, Lanark
Report dated 29 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
161 - 172 
13  Application P/22/0699 for Change of Use of Office Accommodation in
North Stand to Assisted Accommodation at New Douglas Park, Cadzow
Avenue, Hamilton
Report dated 29 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
173 - 182 
14  Application P/22/0498 for Demolition of Existing Garage and Shed and
Erection of New Shed and Gym at 20 Stonehouse Road, Sandford
Report dated 29 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
183 - 196 
15  Application P/22/0779 for Amendment to Planning Consent P/20/1667 to
Remove Madrid House Type, Remix Plots and Addition of Garden Rooms
to 20 Plots at Land 90 Metres East Southeast of 24 Simpson Drive,
Strutherhill, Larkhall
Report dated 29 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
197 - 210 
16  Application P/22/0923 for Erection of 19 Houses with Infrastructure, Open
Space, Road Improvements and Associated Works at Land 35 Metres
North of Trunlehill, Newlands Road, East Kilbride
Report dated 30 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
211 - 222 
17  Application P/22/0927 for Erection of 12 Flats with Associated Vehicular
Access, Parking and Landscaping at Low Waters Miners Welfare and
Social Club, 4 Alness Street, Hamilton
Report dated 30 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
223 - 234 
18  South Lanarkshire Local Development Plan 2 - Supporting Planning
Guidance - Community Infrastructure Assessment
Report dated 20 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
235 - 264
3

Page 4

19  South Lanarkshire Local Development Plan 2 - Supporting Planning
Guidance - Hagshaw Energy Cluster Development Framework
Report dated 20 September 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
265 - 324 
Urgent Business 
20  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Stuart McLeod
Clerk Telephone: 07385 370 117
Clerk Email: stuart.mcleod@southlanarkshire.gov.uk 
4

Page 5

PLANNING COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 13 September 2022 
Chair:
Councillor Richard Nelson 
Councillors Present:
Councillor Alex Allison, Councillor Ross Clark, Councillor Gerry Convery (Depute), Councillor
Margaret Cowie, Councillor Maureen Devlin, Councillor Mary Donnelly, Councillor Gladys Ferguson-
Miller, Councillor Alistair Fulton, Councillor Celine Handibode, Councillor Mark Horsham, Councillor
Ross Lambie, Councillor Lesley McDonald, Councillor Davie McLachlan, Councillor Julia Marrs
(substitute for Councillor David Shearer), Councillor Norman Rae, Councillor Dr Ali Salamati,
Councillor Bert Thomson (substitute for Councillor Ralph Barker), Councillor Helen Toner, Councillor
David Watson 
Councillors' Apologies:
Councillor Ralph Barker, Councillor Archie Buchanan, Councillor Joe Fagan (ex officio), Councillor
Elise Frame, Councillor Monique McAdams, Councillor John Ross, Councillor Graham Scott,
Councillor David Shearer 
Attending:
Community and Enterprise Resources
B Darroch, Planning and Building Standards Manager (East); T Finn, Planning and Building
Standards Manager (Headquarters); F Jack, Team Leader, Development Management Team,
Roads and Transportation Services; I Morton, Planning Team Leader (West Team)
Finance and Corporate Resources
M Cannon, Solicitor; S Jessup, Administration Assistant; S McLeod, Administration Officer 
Death of HRH Queen Elizabeth II
The Chair referred to the death of HRH Queen Elizabeth II.  As a mark of respect, all present stood
and observed a minute’s silence. 
1 Declaration of Interests 
The following interests were declared:- 
Councillor(s)
Donnelly
Item(s)
Application P/22/0954 for Erection of
Single Storey Rear Extension at 59
Newfield Crescent, Hamilton
Nature of Interest(s)
Applicant 
Marrs Application P/22/0954 for Erection of
Single Storey Rear Extension at 59
Newfield Crescent, Hamilton
Friend of the applicant 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Planning Committee held on 16 August 2022 were submitted
for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.
2
5

Page 6

3 Application P/22/0954 for Erection of Single Storey Rear Extension at 59 Newfield
Crescent, Hamilton 
A report dated 24 August 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/22/0954 by M Donnelly for the erection of a
single storey rear extension at 59 Newfield Crescent, Hamilton. 
The Committee decided: that planning application P/22/0954 by M Donnelly for the
erection of a single storey rear extension at 59 Newfield
Crescent, Hamilton be granted subject to the conditions
specified in the Executive Director’s report. 
Councillors Donnelly and Marrs, having declared an interest in this item, withdrew from the meeting
during its consideration 
4 Application P/22/0524 for Erection of 296 Houses and Associated Infrastructure
Works (Approval of Matters Specified in Conditions 1 (a to r), 3, 4, 6, 7, 8, 9, 10 and
12 of Planning Consent EK/09/0218 at Bellway Phase 2, East Kilbride Community
Growth Area (CGA), Newhouse Road, East Kilbride 
A report dated 1 September 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/22/0524 by Bellway Homes Limited and
Abbey Developments (Jackton) Limited for the erection of 296 houses and associated
infrastructure works (approval of matters specified in conditions 1 (a to r), 3, 4, 6, 7, 8, 9, 10 and
12 of planning consent EK/09/0218 at Bellway Phase 2, East Kilbride Community Growth Area
(CGA), Newhouse Road, East Kilbride. 
There followed a discussion on the application during which an officer responded to members’
questions on aspects of the report. 
The Committee decided: that planning application P/22/0524 by Bellway Homes
Limited and Abbey Developments (Jackton) Limited for
the erection of 296 houses and associated
infrastructure works (approval of matters specified in
conditions 1 (a to r), 3, 4, 6, 7, 8, 9, 10 and 12 of
planning consent EK/09/0218 at Bellway Phase 2, East
Kilbride Community Growth Area (CGA), Newhouse
Road, East Kilbride be granted subject to the conditions
specified in the Executive Director’s report. 
[Reference:  Minutes of 26 June 2018 (Paragraph 4)] 
Councillor Watson, as the mover of an amendment which failed to find a seconder, asked that his
dissent be recorded 
Councillor Rae joined the meeting during this item of business 
5 Application P/22/0851 for Erection of 55 Houses with Associated Infrastructure
and Landscaping at Land 165 Metres Southwest of South Lanarkshire Lifestyles
Stonehouse, Strathaven Road, Stonehouse, Larkhall 
A report dated 25 August 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/22/0851 by Miller Homes for the erection of
55 houses with associated infrastructure and landscaping at land 165 metres southwest of
South Lanarkshire Lifestyles Stonehouse, Strathaven Road, Stonehouse, Larkhall.
6

Page 7

At its meeting on 7 July 2015, the Committee had approved a procedure for processing planning
applications which required completion of a Legal Agreement.  If approved, the application
would be subject to a Legal Agreement and/or other appropriate mechanism and the approved
procedure would apply. 
There followed a discussion on the application during which officers responded to members’
questions on aspects of the report. 
The Committee decided: 
(1) that planning application P/22/0851 by Miller Homes for the erection of 55 houses with
associated infrastructure and landscaping at land 165 metres southwest of South
Lanarkshire Lifestyles Stonehouse, Strathaven Road, Stonehouse, Larkhall be granted
subject to:- 
 the conditions specified in the Executive Director’s report
 prior conclusion of a Section 75 Agreement and/or other appropriate agreement
between the Council and the applicant to ensure a financial contribution was made
for the improvement/upgrading of educational and community facilities and the
provision of off-site affordable housing
 the applicant meeting the Council’s costs associated with the legal agreements 
(2) that it be noted that, in accordance with the agreed procedure, should there be no
significant progress by the applicant towards the conclusion of the Legal Agreement within
6 months of the date of the meeting at which the application was considered, the proposed
development could be refused on the basis that, without the planning control or developer
contribution which could be secured by the Legal Agreement, the proposed development
would be unacceptable; and 
(3) that it be noted that, if the Legal Agreement had not been concluded within the 6 month
period but was progressing satisfactorily, the applicant would be offered the opportunity to
enter into a Processing Agreement, if this was not already in place, which would set an
alternative agreed timescale for the conclusion of the Legal Agreement. 
[Reference:  Minutes of 7 July 2015 (Paragraph 15) and 26 April 2016 (Paragraph 6)] 
6 Application P/22/0469 for Discharge of Conditions 1 (Excluding 1(f)), 6, 8, 9, 10, 11,
12, 13, 14, 16 and 18 of Consent HM/17/0488 (Mixed Use Development
Incorporating Residential Houses, Hotel, Office, Care Home, Retail,
Restaurant/Cafe, Open Space and Associated Works (Planning Permission in
Principle) (Approval of Matters Specified in Conditions) at Former University of
the West of Scotland, Almada Street, Hamilton 
A report dated 2 September 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/22/0469 by First Endeavour LLP and the
University of the West of Scotland for the discharge of conditions 1 (excluding 1(f)), 6, 8, 9, 10,
11, 12, 13, 14, 16 and 18 of Consent HM/17/0488 (mixed use development incorporating
residential houses, hotel, office, care home, retail, restaurant/café, open space and associated
works (Planning Permission in Principle) (Approval of Matters Specified in Conditions) at the site
of the former University of the West of Scotland, Almada Street, Hamilton. 
There followed a discussion on the application during which an officer responded to members’
questions on aspects of the report.
7

Page 8

The Committee decided: that application P/22/0469 by First Endeavour LLP and the
University of the West of Scotland for the discharge of
conditions 1 (excluding 1(f)), 6, 8, 9, 10, 11, 12, 13, 14, 16 and
18 of Consent HM/17/0488 (mixed use development
incorporating residential houses, hotel, office, care home,
retail, restaurant/café, open space and associated works
(Planning Permission in Principle) (Approval of Matters
Specified in Conditions) at the site of the former University of
the West of Scotland, Almada Street, Hamilton be granted
subject to the conditions specified in the Executive Director’s
report. 
[Reference:  Minutes of 13 February 2018 (Paragraph 9)] 
7 Application P/22/0348 for Erection of Restaurant with Ancillary Takeaway and New
Vehicular Access, Parking and Associated Works at 235 Stonelaw Road,
Rutherglen 
A report dated 25 August 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/22/0348 by M Naveed for the erection of a
restaurant with ancillary takeaway and new vehicular access, parking and associated works at
235 Stonelaw Road, Rutherglen. 
There followed a discussion on the application during which officers responded to members’
questions on aspects of the report. 
The Committee decided: that application P/22/0348 by M Naveed for the erection of a
restaurant with ancillary takeaway and new vehicular access,
parking and associated works at 235 Stonelaw Road,
Rutherglen be granted subject to the conditions specified in the
Executive Director’s report. 
[Reference:  Minutes of 6 November 2018 (Paragraph 5)] 
8 Application P/21/1127 for Erection of 6 Wind Turbines (5 With a Maximum Height
to Tip of 250 Metres and 1 with a Maximum Height to Tip of 209 Metres) and
Associated Infrastructure Including Access Tracks and Electrical Control Building
at Mill Rig Wind Farm, Waterhead Peelhill and Linbank Highway, Strathaven 
A report dated 2 September 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/21/1127 by Mill Rig Wind Farm LLP, c/o
Banks Renewables Limited for the erection of 6 wind turbines (5 with a maximum height to tip of
250 metres and 1 with a maximum height to tip of 209 metres) and associated infrastructure
including access tracks and electrical control building at Mill Rig Wind Farm, Waterhead Peelhill
and Linbank Highway, Strathaven. 
The application was considered acceptable on the basis that the proposal was consistent with:- 
 relevant government policy and guidance
 the adopted South Lanarkshire Local Development Plan 2
8

Page 9

At its meeting on 7 July 2025, the Committee had approved a procedure for processing planning
applications which required completion of a Planning Obligation.  If approved, the application
would be subject to a Planning Obligation and/or other agreement and the approved procedure
would apply. 
The Committee decided:- 
(1) that planning application P21/1127 by Mill Rig Wind Farm LLP, c/o Banks Renewables
Limited for the erection of 6 wind turbines (5 with a maximum height to tip of 250 metres
and 1 with a maximum height to tip of 209 metres) and associated infrastructure including
access tracks and electrical control building at Mill Rig Wind Farm, Waterhead Peelhill and
Linbank Highway, Strathaven be granted subject to:- 
 the conditions specified in the Executive Director’s Report
 the conclusion of a Planning Obligation and/or other legal agreements between the
Council and the applicant to ensure:-
 a bridge assessment analysis was undertaken to ensure that all bridges
affected by the proposals could safely accommodate abnormal loads and that a
report be submitted (which demonstrated suitable check certification had been
carried out) for the Council, as Roads Authority, to approve
 any remediation works required to be carried out on any bridge not considered
to be capable of carrying the proposed loads, following approval of the works by
the Council, as Roads Authority, be carried out by the applicant
 a suitable inspection regime of the bridges during construction of the wind
turbines, which would inform the resultant requirements and responsibilities of
the applicant, be detailed in the legal agreement
 the provision of community contribution payments
 the applicant meeting the Council’s legal costs associated with the Planning
Obligation and/or other legal agreements 
(2) that it be noted that in accordance with the agreed procedure, should there be no
significant progress, by the applicant, towards the conclusion of the Planning Obligation
and/or other legal agreements within 6 months of the date of the Committee at which the
application was considered, the proposed development could be refused on the basis that,
without the planning control or developer contribution which would be secured by the
Planning Obligation and/or other legal agreements, the proposed development would be
unacceptable; and 
(3) that it be noted that, if the Planning Obligation and/or other legal agreements had not been
concluded within the 6 month period but was progressing satisfactorily, the applicant would
be offered the opportunity to enter into a Processing Agreement, if this was not already in
place which would set an alternative agreed timescale for the conclusion of the Planning
Obligation and/or other legal agreements. 
[Reference:  Minutes of 7 July 2015 (Paragraph 15) and 10 September 2019 (Paragraph 6)] 
9 Application P/22/0349 for Extension to Time Period of Planning Permission
P/19/0076 for a Further 3 Years at Larkhall Community Growth Area, Summerlee
Road, Larkhall 
A report dated 5 September 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/22/0349 by Persimmon Homes for an
extension to the time period of planning permission P/19/0076 for a further 3 years at Larkhall
Community Growth Area, Summerlee Road, Larkhall.
9

Page 10

The Committee decided: that application P/22/0349 by Persimmon Homes for an
extension to the time period of planning permission P/19/0076
for a further 3 years at Larkhall Community Growth Area,
Summerlee Road, Larkhall be granted subject to the conditions
specified in the Executive Director’s report. 
[Reference:  Minutes of 19 November 2019 (Paragraph 5)] 
10 Urgent Business 
There were no items of urgent business. 
10

Page 11

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/21/2167
Change of use of after school care facility to Class 1 retail premises
and associated external alterations 
1 Summary application information
Amended
•  Application type:  Detailed planning application
•  
Applicant:  1A Real Estate Ltd  
•  Location:  Cruse House
20 Argyle Drive
Hamilton
South Lanarkshire
ML3 9EB 
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) Grant detailed planning permission (subject to conditions) based on conditions
attached.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
(2) A request for a hearing prior to determination has been received. However, in
terms of the Council’s guidance on hearings, the request is not considered to
meet the criteria in this case.  Therefore, the application can be determined
without a hearing taking place. 
3 Other information
♦ Applicant’s Agent: Kevin Spence
♦ Council Area/Ward: 18 Hamilton West and Earnock
♦ Policy Reference(s): South Lanarkshire Local Development Plan 2
(adopted 2021)
Policy 2 Climate Change
Policy 3 General Urban Areas  
3
11

Page 12

Policy 5 Development Management and
Placemaking
Policy 10 New Retail and Commercial Proposals
Policy 15 Travel and Transport
Policy DM1 New Development Design 
♦   Representation(s): 
► 24  Objection Letters
► 0  Support Letters
► 0  Comment Letter 
♦   Consultation(s):   
Roads Development Management Team 
Environmental Services 
12

Page 13

Planning Application Report
1 Application Site
1.1 The application site consists of a modern, single storey building and associated
ground, located at Cruse House, 20 Argyle Drive, Hamilton.  It was originally
constructed as a new build unit in the early 1980’s, as a doctor’s surgery, as well as
also being used as a bereavement support unit, and more recently as an afterschool
childcare facility.  Historic OS maps also indicate that the site was occupied by a retail
unit in the 1950s/ 1960s. 
1.2 Argyle Drive is a no through road, set within an established residential area
predominantly comprised of 2 and 3 storey local authority constructed houses and
flats.  Until recently, a pedestrian safety barrier existed along the frontage of the site,
although it had been removed by the applicant to facilitate access for building
renovation purposes.  The barrier has now been reinstated by the applicant.  The site
is bounded by residential properties to north, south and east, and by a small area of
public open space at the rear, to the west. 
2 Proposal(s)
2.1 The applicant proposes the change of use of the vacant Class 10 unit (Non –
Residential Institution) to form a Class 1 retail shop unit, and for associated external
alterations to form an aluminium framed, double glazed shopfront.  The original plans
also proposed the formation of a single car parking space to the front of the site,
although this has now been amended to indicate the reinstatement of the recently
removed pedestrian safety barrier, following discussions with roads and planning
officers. 
2.2 The detailed plans submitted indicate that the majority of the 188 square metre
property will be utilised as retail floorspace, with the remainder of the floorspace
providing a small storeroom at the rear, a staff WC and a staff kitchen area.  A small,
covered cycle store is also proposed at the front of the premises. 
3 Background
3.1 Local Plan Status
3.1.1 In terms of the South Lanarkshire Local Development Plan 2 (adopted 2021), the site
is located within a general urban area, and is therefore subject to an assessment
against the following policies:- 
 Policy 2 Climate Change 
 Policy 3 General Urban Areas and Settlements 
 Policy 5 Development Management and Placemaking 
 Policy 10 New Retail/Commercial Proposals 
 Policy 15 Travel and Transport 
 Policy DM1 New Development Design 
3.2 Relevant Government Advice/Policy
3.2.1 Given the nature and scale of the proposal, there is no specific government guidance
relevant to the determination of this application.  There is, however, a growing move
towards providing locally accessible, sustainable services and facilities, often referred
to as 20 minute neighbourhoods.  As the name suggests, these neighbourhoods
should be able to provide residents with the majority of services and facilities they seek
within a reasonable walking distance of where they live, helping to minimise car
use/dependency, and assisting with tackling climate change by providing sustainable
alternatives. 
13

Page 14

3.3 Planning Background
3.3.1 As stated above, the site is understood to have been occupied by a Class 1 retail shop
in the late 1950s and 1960s, prior to the erection of the current building as a doctor’s
surgery in 1980.  The property was subsequently utilised as a bereavement centre
facility by Cruse Bereavement Support.  Planning permission was also granted in 2003
for the partial change of use of the premises to an after school care facility, albeit
restricted to between 3 pm and 5.30 pm Monday to Friday, (planning ref: HM/03/0808).
It is understood that both the bereavement support facility and the after school care
facility operated from the premises at the same time, albeit at different hours of the
day. 
4 Consultation(s)
4.1 Roads and Transportation Services – no objections, as the proposals will not
generate a significant volume of traffic, and the lack of parking may in fact encourage
walking trips.  In addition, on street parking already occurs on Argyle Drive and,
provided the anticipated small number of drivers park in a considerate manner, Roads
and Transportation Services do not consider this will cause issues. 
Response:  Noted and agreed. 
4.2 Environmental Services – no objections, subject to the attachment of an informative
relating to the proposed use of the premises for the preparation, sale, or consumption
of food. 
Response: Noted. Relevant informatives would be added to any consent. 
5 Representation(s)
5.1 Statutory neighbour notification was undertaken, and the proposal was further
advertised in the local press.  24 letters of objection and a petition with 67 signatures
have been received as a result of this publicity.  The organiser of the petition claims
that 102 people signed the petition, however, admits it was submitted in 3 parts, one
of which had no front cover sheet and which to date has not been located.  The
grounds of objection and matters raised are summarised below:- 
a) Concerns regarding the negative impact on the surrounding area from
extra traffic, noise, and danger to existing residents from cars parking on
pavements and restricting visibility, noting that Argyle Drive is a narrow,
no through road with no traffic calming, set within a residential area,
where historically there have been several serious accidents.  Further,
there is no parking provision for customers which will lead to the road
being blocked, access to resident’s driveways being restricted and
potential restrictions on emergency vehicles and refuse trucks etc being
unable to safely pass the site.  In addition, the road is not suitable for large
delivery vehicles and the previous use as an after school care facility
caused many parking issues, which will be exacerbated if the current
application is approved. 
Response:  These concerns are noted, however, the Council’s Roads and
Transportation Services have been consulted on this application and have
offered no objections to the proposed change of use.  Further, the modest size
of the retail unit proposed does not appear to be of a scale that would result in
significant additional traffic or parking in the local area.  Colleagues in Roads
and Transportation Services would assess the need for any traffic calming,
should it be requested, and the Police could investigate any illegal/obstructive
parking issues that may arise.  
14

Page 15

b) Concerns regarding the negative impact on the residential amenity of the
surrounding residential area, in particular delivery noise early in the
morning, litter and anti-social behaviour if permission is granted. 
Response:  These concerns are noted, however, the levels of noise
disturbance and litter associated with a retail shop of the 188 square metre size
proposed are considered unlikely to be of an extent that warrants refusal of the
application.  It should also be noted that historically a similar sized retail unit
occupied the site, and that it has had a variety of commercial/business uses
with associated noise and disturbance over the last 40 years.  With regard to
anti-social behaviour, the Police would be able to investigate any instances of
anti-social behaviour in the area.  Further, it is also considered that a retail shop
operating from the currently vacant premises would create an active frontage in
this part of Argyle Drive, in addition to noting that most shop units have CCTV
to monitor anti-social behaviour outside their premises.  Indeed, it could be
argued that the reuse of the site could in fact result in an improvement to the
appearance of the vacant building, and potentially result in less anti-social
behaviour. 
c) Questions over the need for a retail unit on the site, given the proximity of
the site to the existing Burnbank shopping centre and other nearby retail
premises.  In addition, concerns that an approval for a shop would take
away business from these existing shops.  
Response:  Noted, however, issues of commercial competition are not a
material consideration in the assessment of the application, and the Council
assesses each planning application on its individual merits. 
d) Everyone in the wider housing estate should be served neighbour
notification, as the proposed development will impact on the whole
neighbourhood, not just those within the 20 metre buffer zone indicated
on the neighbour notification map.  Do the total number of neighbours in
the buffer zone qualify for a serious objection to the proposed
development?
Response:  These comments are noted, however, the planning application has
been subject to the normal standard levels of statutory consultation (neighbour
notification of properties close to the site and an advert in the local newspaper). 
It is understood that some residents would have liked further properties outwith
the 20 metre buffer zone to have been neighbour notified, however, the distance
requirements for neighbour notification are set out in relevant legislation by the
Scottish Government.  It is considered that the standard methods of
consultation on the planning application were sufficient in this instance. 
e) Concerns that the retail shop will sell alcohol.  Drug and alcohol addiction
is a serious problem in the local area, which can also be backed up by the
local police and the Council.  Would any resultant disturbances and anti-
social behaviour be dealt with by the overstretched local police service?
Response:  These concerns are noted, however, planning permission is sought
for a Class 1 retail shop use, where the sale of alcohol cannot be restricted
under planning controls.  Notwithstanding this, the sale of alcohol from the
premises would require to be the subject of a separate licensing application.
With regard to anti-social behaviour, as stated in point b) above, the Police
would be able to investigate any instances in the area. 
f) Concern that the premises would encourage criminality. 
Response:  This concern is noted, however, no further reasoning or evidence
for coming to this conclusion are provided. 
15

Page 16

g) Concerns that the building has no water supply, is prone to flooding and
cannot be insured.  How will the new owners go about repairing the drains
etc, without making repairs/changes to the building, noting that there is
not enough space for access for equipment to repair?
Response:  These concerns are noted and are for the owner/applicant to
consider. Given its urban location, it is unlikely that all relevant services,
including water and drainage, cannot be provided. With regard to the degree of
available space around the existing building for repairs to be undertaken,
following a recent site visit it is considered that adequate space exists on all
sides of the structure, should repairs be required.     
h) Concerns that building works have been carrying on since March 2022,
without any planning permission having been granted.  In addition, the
workmen have been blocking existing resident’s access to their
properties and have removed a large section of pedestrian safety barrier
along Argyle Drive, to facilitate the placing of a skip on the public
pavement area outside the property.  Planning Permission should be
denied in light of this blatant disregard for safety and respect for
neighbouring properties.
Response:  These comments are noted. In response, the Council has
contacted the agent for the application on a number of occasions, to advise that
building works should cease until such time that a decision has been made on
the application, and that any works continuing are undertaken without approval,
and wholly at the risk of the applicant.  With regard to the removal of the safety
barrier, the applicant has been told to replace this in its original position, which
has been agreed to. Roads and Transportation Services have also been
pursuing this issue separately with the applicant. Finally, with regard to refusing
permission in light of the works already undertaken at the property and their
impact on local residents, Scottish Government advice is that retrospective
applications should be assessed in the same manner as any other planning
application. 
i) Concerns that a previous application for a retail premises was turned
down.  What makes this current application different?  
Response:  There is no record of a previous planning application having been
refused for a shop at the current site within the last 20 years, and the objector
hasn’t provided any further clarification.  It should, however, be noted that in
terms of the 1997 Use Classes (Scotland) Order, had the original approved use
of the property as a Class 2 Doctor’s surgery, and the later Class 2
bereavement support centre continued, the applicant would not have required
a planning application to change the use to a Class 1 retail shop.  This is
because a change from Class 2: Financial, professional, and other services to
Class 1:  Shops is a permitted change in terms of the relevant Use Classes
legislation.  The current planning application only requires permission as the
premises was partly utilised for 2 and a half hours a day, Monday to Friday, as
a Class 10 after school facility. 
j) Concerns that the site is prone to flooding during periods of heavy rain,
which creates a hazard. 
Response:  Noted.  The proposals seek consent for a change of use of an
existing building, with no additional extensions, and are therefore unlikely to
result in any additional flood risk.  
16

Page 17

k) Suggestions that the vacant premises could be used for something much
more beneficial to local residents, for example, a centre for kids with
activities to do and somewhere they can play safely.
Response:  It is acknowledged that there are other potential ways to develop
this site, however, when a planning application is submitted an assessment of
that particular proposal requires to be undertaken.  Alternative proposals would
require the submission and assessment of separate planning applications.  The
applicant wishes to have the submitted planning application assessed and
determined in its current form. 
l) Concerns that the plans do not indicate where the proposed shop will
keep their commercial waste.  In addition, commercial waste could
encourage insects and vermin, result in contaminated surface water
running into the ecosystem and impact on air quality for residents in
terms of foul smells from the bins.
Response:  The applicant seeks planning permission for the change of use to
a retail shop and therefore commercial waste is likely to be limited to cardboard
boxes and food/retail goods packaging.  The site has adequate open space to
the side and the rear where commercial waste bins may be stored, and the
agent has amended the proposed site plan to reflect this.  Given the type of use
proposed it is unlikely that the type of waste produced will result in attracting
insects and vermin to the site or result in air quality issues/smells.  With regard
to contaminated surface water, again, given the type of waste likely to result,
cardboard and packaging, this is highly unlikely to result in contaminated
surface water at the site.  Notwithstanding this, the Council’s Environmental
Services could investigate and take action should any issues of contaminated
water, smells, vermin, or air quality arise. 
m) Concern that an application for 3 car parking spaces outside the premises
will take up most of the existing pavement area, resulting in a dangerous
health and safety issue, particularly for wheelchair users. 
Response:  Noted, however, following a number of discussions between the
applicant and the Council, the plans have been amended to drop the originally
requested car parking spaces at the front of the premises.  Roads and
Transportation Services have also stated that the preference will be to reinstate
the recently removed pedestrian safety barrier located at the edge of the
pavement to the front of the premises and are in active discussion with the
applicant to ensure this is carried out. 
n) Concerns that if the safety barrier is to stay removed that delivery vehicles
and customers will park on the pavement.  Alternatively, if the barrier
removed is to be reinstated this will narrow the road outside the shop and
make it nearly impossible for vehicles to pass.
Response:  As stated in m) above, the safety barrier is to be reinstated and the
road is considered to be wide enough to enable 2 vehicles to pass each other
safely.  It should also be noted that parking vehicles on the public road, in a
considerate manner, can be considered to effectively represent a form of traffic
calming, slowing vehicle speeds. 
o) A petition has been submitted in objection to the application by the local
residents.  This petition clearly shows that every resident, with the
exception of one who had no opinion, do not want, or need the store. 
Residents in adjoining streets have also signed, indicating that they also
don’t want this store.  In weighing this up, the Planning Committee can
only reach one outcome.  Further, this decision does not impact on any
17

Page 18

other person than the local residents. Refusing the application does not
affect the applicant’s lifestyle, as he has several other stores.  As a
democracy the overwhelming voice of the majority must be taken. 
Residents should not have their lives impacted on for the profit of one
person.
Response:  The submission of the petition and the number of signatures is
noted, however, all of the points raised have been fully considered in the
assessment of the planning application.  The strength of public feeling is
recognised, however, a planning application requires to be assessed against
material planning considerations.  With regard to the potential impact of a
refusal on the applicant’s lifestyle, this is not a material planning consideration. 
It should also be noted that in the vast majority of cases, including this one, any
resultant planning approval is attached to the physical property/site, and not to
the applicant. 
p) Concerns that on all postcode search engines a Nisa store is listed at this
property.  This is rather presumptuous since planning has not been
approved, or has it?
Response:  This concern is noted, however, it is not material to the assessment
of the application.  The Council has no input into what information is provided
by internet postcode search engines.  To date, as stated above, no approval
has been given for the use/works proposed, or for those partly undertaken on
site. 
q) Having read the comments from the Roads Department, the Government’s
guidelines for 20 minute neighbourhoods is more than covered.  There
are more than 20 convenience stores, 6 supermarkets and Hamilton Town
Centre within 20 minutes’ walk of the application site.  The proposed shop
will be within 3 minutes’ walk from anywhere on the housing estate.
Response:  This comment is noted, however, the proposals seek consent to
bring a vacant local property back into productive use, adding to consumer
choice in the local neighbourhood.  It may also be that this is the only retail shop
unit that a number of residents are physically able to walk to, given its close
proximity for local residents, some of whom may in fact be unable to walk/travel
further to other retail premises in the wider surrounding area. 
5.2 These letters are available for inspection on the planning portal. 
6 Assessment and Conclusions
6.1 The applicant seeks detailed planning consent for the change of use of a vacant Class
10 unit (Non – Residential Institution) to form a Class 1 retail shop unit, and for
associated external alterations to form a new double glazed shopfront at 20 Argyle
Drive in Hamilton.  The main determining issues in assessing this proposal are whether
it accords with adopted local development plan policy and its impact upon residential
and visual amenity, and on road safety. 
6.2 In terms of the adopted South Lanarkshire Local Development Plan 2, the relevant
policies to be considered for this application are Policies 2, 3, 5, 10, 15 and DM1. 
6.3  Policy 2 – Climate Change states that proposals for new development must, where
possible, seek to minimise and mitigate against the effects of climate change by
meeting a number of criteria, including maximising the reuse of vacant and derelict
land, and having no significant adverse impacts on the water and soils environment,
air quality and biodiversity.  Having carefully considered the impact of the proposal
and associated alterations on site, it is considered that the retail use, and the
18

Page 19

development’s scale, design, and siting would not have a significant adverse impact
on the water and soil environments, or on biodiversity.  The proposals in this instance
raise no issues in relation to flood risk, and the proposals are considered to represent
the appropriate re-use of a previously occupied, vacant building. 
6.4 Policy 3 (General Urban Area) states that within urban areas and settlements,
proposals for uses ancillary to residential areas will be assessed on their individual
merits, with particular regards to their effect on the amenity and character of the area. 
Developments which would be detrimental to the amenity of residents and the wider
community, or to the character of the surrounding area will not be permitted.  Following
a detailed assessment, it is considered that the proposed use as a retail shop would
not be detrimental to the amenity of residents and the wider community, or to the
character of the surrounding area. 
6.5 Policy 5 (Development Management and Placemaking) seeks to ensure that
development takes account of and is integrated with, the local context and built form. 
Proposals should have no significant adverse impacts on the local community and
include, where appropriate, measures to enhance the environment.  As the proposal
seeks to bring a vacant, unoccupied property back into productive use, with minimal
external alterations, the proposals are considered to take account of the local context
and built form and have no significant adverse impact on the local community. 
6.6 Policy 10 New Retail/Commercial Proposals states that any proposals for retail or
commercial development will be assessed against a number of criteria, including;
proposals should not undermine the vitality and viability of town centres and/or local
centres; be supported by the area’s catchment population; complement regeneration
strategies for the area; promote sustainable development; take account of
development location and accessibility; promote quality design and accessibility for all. 
Following a detailed assessment, it is considered that the proposed change of use and
associated alterations complies with all relevant policy criteria of Policy 10, in particular
being of a modest scale that should not undermine the vitality and viability of either
Burnbank or Hamilton town centre. 
6.7 Policy 15 Travel and Transport states new development proposals should aim to
reduce the need to travel.  Proposals should incorporate measures to reduce travel by
private car and encourage walking, cycling and public transport.  Proposals should
also support and facilitate economic recovery, regeneration, and sustainable growth. 
As this proposal seeks to bring a vacant property back into use as a retail unit to serve
the local neighbourhood, reducing the need to travel, it is considered to represent a
form of development that fully complies with the requirements of Policy 15. 
6.8 Finally, Policy DM1 (New Development Design) states that new development will
require to promote quality and sustainability and should make a positive contribution
to the character and appearance of the environment.  New developments will require
to:- 
 Respect the local context and be appropriate to the character and topography of
the site in terms of layout, scale, proportion, massing, and appearance.  
 Be of a high quality design which is sympathetic to local traditions of form,
detailing and materials.
 Ensure that any archaeological, built heritage, landscape features and natural
conservation interests on or adjacent to the site are identified and incorporated
into the overall layout and design, with appropriate measures taken to enhance
and/or protect the setting of these features.  
19

Page 20

 Address sustainable development issues including the incorporation of energy
efficient designs and layouts, the re-use/recycling of materials, water and waste,
and the use of alternative energy sources.
 Ensure there is no conflict with adjacent land uses and no adverse impact on
properties in terms of overlooking, loss of privacy, overshadowing, noise and
disturbance. 
6.9 Following a detailed assessment, it is considered that the proposals do respect the
local context and are appropriate to the character and topography of the site, are of a
high quality design that is sympathetic to the local area and have no adverse impact
on built heritage or nature conservation.  Further, they represent a sustainable reuse
of an existing vacant building and ensure no conflict with the adjacent residential land
use and it is unlikely to result in adverse impacts. 
6.10 In summary, following a full and detailed assessment of the proposed development, it
is considered that it would have no significant adverse impact upon residential or visual
amenity, the character of the area or road safety, and that it is in accordance with the
relevant policies of the adopted South Lanarkshire Local Development Plan 2 (2021). 
As such, the granting of planning permission is recommended. 
7 Reasons for Decision
7.1 The proposals are considered acceptable in terms of the proposed use, their scale,
design and siting, their potential impact on residential and visual amenity, and are in
accordance with Policies 2, 3, 5, 10, 15 and DM1 of the adopted South Lanarkshire
Local Development Plan 2.  There are no other material considerations which would
justify the refusal of planning permission. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 3 October 2022 
Previous references
 HM/03/0808 
List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter dated 07.01.2022
► Newspaper Advert, Hamilton Advertiser, dated 20.01.2022 
► Consultations 
Roads Development Management Team 17.02.2022
29.06.2022 
Environmental Services 07.01.2022 
20

Page 21

► Representations           Dated: 
Mrs Jean McGilligan, 21 Argyle Drive, Hamilton, ML3 9EB  09.01.2022 
Lesley Steele/Morrison, Received Via Email  13.01.2022 
M Braidwood, 11 Argyle Drive, Hamilton, South Lanarkshire,
ML3 9EB 
20.01.2022 
Mrs Christine Boyd, 18 Argyle Drive, Burnbank, Hamilton,
ML3 9EB 
20.01.2022 
Mr Thomas Gallagher, 18 Argyle Drive, Hamilton, ML3 9EB  20.01.2022
Mrs Jean McGilligan, 21 Argyle Drive, Hamilton, ML3 9EB 
Karen Duddy, Received Via Email 
26.01.2022 
28.01.2022 
Mr Gordon Todd, 19 Argyle Drive, Burnbank, ML3 9EB  16.01.2022 
Mr Gerard Rooney, 61 Leys Park, Hamilton, ML3 9EQ  08.04.2022 
Ms Michelle Neil, 16 Marswood Green, Hamilton, ML3 9EE  09.04.2022 
Mr Paul Maguire, 50 Leys Park, Hamilton, ML3 9EQ 
Mr Bernie Anderson, 52 Argyle Drive, Hamilton, 
11.04.2022 
14.04.2022 
Mrs Jean McGilligan, 21 Argyle Drive, Hamilton, ML3 9EB  23.03.2022 
Ann Hanlan, 4 Marrswood Green, Hamilton  08.04.2022 
Sandra Mullen, 36 Argyle Drive, Hamilton, South Lanarkshire,
ML3 9EB 
06.05.2022 
Jean McGilligan, 21 Argyle Drive, Hamilton, South
Lanarkshire, ML3 9EB 
06.05.2022 
Miss Lauren Allan, 50 Leys Park, Hamilton, ML3 9EQ  11.04.2022 
Mr William Clark, 7 Marrswood Green, Burnbank, Hamilton,
ML3 9ED 
08.04.2022 
Mrs Jean McGilligan, 21, Argyle drive, Hamilton, ML3 9EB  03.08.2022 
Mrs Jean McGilligan, 21 Argyle Drive, Hamilton, ML3 9EB  26.04.2022 
Mrs Lorraine Dickie, 9 Marrswood Green, Burnbank,
Hamilton, ML3 9ED 
03.04.2022 
Miss Natalie Kiely, 28 Argyle Drive, Hamilton, ML3 9EB 
Miss Natalie Kiely, 28 Argyle Drive, Hamilton, ML3 9EB 
06.04.2022 
07.04.2022 
21

Page 22

Mrs Jean McGilligan, 21 Argyle Drive, Hamilton, ML3 9EB 
Mrs Jean McGilligan, 21 Argyle Drive, Hamilton, ML3 9EB 
26.05.2022 
22.08.2022 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Stuart Ramsay, Planning Officer, Montrose House, 154 Montrose Crescent, Hamilton, ML3
6LB
Phone: 07551 840 251   
Email: stuart.ramsay@southlanarkshire.gov.uk  
22

Page 23

Detailed planning application 
Paper apart – Application number: P/21/2167 
Conditions and reasons 
01. Prior to the retail unit hereby approved being brought into use, the pedestrian safety
barrier indicated on plan G(00) 003 Rev C shall be reinstated to the front of the
premises onto Argyle Drive, and shall thereafter be retained in perpetuity, all to the
satisfaction of the Council as Planning and Roads Authority. 
Reason: In the interests of pedestrian and road safety. 
23

Page 24

24

Page 25

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/21/0521
Erection of three car garage and store with vehicular access from
Moss Road 
1 Summary application information
Amended
•  Application type:  Householder
•  
Applicant:  Alan and Margaret Blackwood Frame
•  Location:  9 Newton Road
Strathaven
ML10 6BQ
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) Grant detailed planning permission (subject to conditions) based on conditions
attached.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
3 Other information
♦ Applicant’s Agent: Jack Blackwood
♦ Council Area/Ward: 05 Avondale and Stonehouse
♦ Policy Reference(s): South Lanarkshire Local Development Plan 2
Policy 2 – Climate Change
Policy 3 – General Urban Areas/Settlements
Policy 5 – Development Management and
Placemaking
Policy DM2 - House Extensions and Alterations 
♦   Representation(s): 
► 13  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
4
25

Page 26

♦   Consultation(s):   
Roads Development Management Team 
Arboricultural Services 
Scottish Water 
Environmental Services 
26

Page 27

Planning Application Report
1 Application Site
1.1 The application site consists of a rear garden at 9 Newton Road, Strathaven.  The site
partly incorporates a grassed area adjacent to Moss Road to the south and covers an
area of approximately 540sqm.  The existing house at 9 Newton Road is situated to
the north of the house plot and the rear garden slopes down to a stream in the middle
of garden, referred to as the Goods Burn.  The associated garden rises again to the
rear (south) towards Moss Road.  The area in question was purchased from the
Council for use as garden ground.  The applicant proposes to take access from Moss
Road to the garage and provide the necessary turning area.  A mature tree sits on the
outside of the site to the east.  The existing plot is similar to those adjacent in that the
house faces onto Newton Road and the garden backs on to Moss Road.  An existing
access sits adjacent to the site and serves the property at 24 Moss Road. 
2 Proposal(s)
2.1 The applicants propose the erection of a split level, two storey garage within the area
previously acquired by the applicant to utilise as garden ground.  The garage will cover
an area of 60sqm and will be a height of 3.74m when viewed from the north, east and
west and 2.92m when viewed from the south.  Approximately 1.3m of the garage will
be underground.  The proposed garage will be accessed via its own separate access
from Moss Road to the south-west.  The lower ground floor will be for the parking of
the applicant’s vehicles and the upper storey will be for storage. 
3 Background
3.1 Local Plan Status
3.1.1 In terms of the South Lanarkshire Local Development Plan 2 (adopted 2021), the site
is located within a general urban area, and is therefore subject to an assessment
against the following policies:- 
 Policy 2 Climate Change 
 Policy 3 General Urban Areas and Settlements 
 Policy 5 Development Management and Placemaking
 Policy DM2 House Extensions and Alterations 
3.2 Relevant Government Advice/Policy
3.2.1 None relevant. 
3.3 Planning Background
3.3.1 EK/04/0390 - Change of use from open space to garden ground and erection of 2
storey extension and detached triple garage - granted October 2004.  Consent never
implemented. 
P/21/1543 - External alterations to dwellinghouse including the infill of the existing
pend to form additional habitable space, the removal of the existing front door and
steps and the erection of a single storey rear extension.  Currently under
consideration. 
4 Consultation(s)
4.1 Roads and Transportation Services – no issues with the proposal subject to the
provision of a satisfactory visibility splay. 
Response:  Noted.  The provision of an appropriate visibility splay has been
conditioned.  
27

Page 28

4.2 Environmental Services – no objections. 
Response:  Noted 
4.3 Scottish Water – no objections, however, the applicant should contact Scottish Water
prior to development commencing.  The applicant has been made aware of this. 
Response: Noted. 
4.4 Arboricultural Services – advise that the adjacent tree must be protected during
construction. 
Response: Noted.  A condition requiring this will be attached to any consent. 
5 Representation(s)
5.1 Statutory neighbour notification was undertaken following which, 13 letters of
representation have been received.  The points raised are summarised as follows: 
a) The proposal is a means to establish the site for the erection of a dwelling.
Response:  Each application is determined on its own merits.  The policies for
a proposed dwellinghouse are different to those in relation to the erection of a
building ancillary to the enjoyment of a dwellinghouse. 
b) When the land was sold for the purposes of additional garden ground, it
stipulated that it could not be sold for the purposes of erecting structures.
The applicant does not own the relevant land.
Response:  These are legal matters and not material planning considerations.
An applicant does not require to own the land they are proposing to develop but
requires the permission of the owner to commence work.  Notwithstanding this,
the applicant has confirmed that they own the relevant land. 
c) There is a protected tree outwith the site which may be subject to damage
through construction of the proposed garage. 
Response: Noted.  A condition has been attached requiring root protection of
the relevant tree. 
d) The works to form the site could cause subsidence and the site will
require substantial regrading
Response: A condition has been attached requiring the submission of details
of the regrading works to be submitted and approved prior to work commencing. 
e) The proposed garage is not in keeping with the locality.  A three-storey
garage is inappropriate.  
Response: The proposed garage will be in proportion with the rear garden
which covers an area of 500sqm beyond the application site.  The applicants
propose to finish the garage in timber and in this regard, would not be of an
appearance uncommon in the area.  The garage is not three storey but is split
level with a lower ground and a ground level. 
f)  The previous application approved on the site expired in 2009 and should
not be a material consideration in the determination of this application. 
Response: Noted.  Each application is determined on its own merits.  
28

Page 29

(g) Two main sewers run through the plot. Scottish Water should be
consulted. 
Response: Scottish Water were consulted and have confirmed that they have
no objections.  The applicant has been advised to contact Scottish Water prior
to any work commencing. 
(h) There is no lower basement plan shown on the drawings.
Response:  These details have been submitted and are available for
inspection on the portal. 
5.2 These letters are available for inspection on the planning portal. 
6 Assessment and Conclusions
6.1 The applicant seeks planning permission for the erection of a three-car garage and
store with vehicular access from Moss Road at 9 Newton Road, Strathaven.  The
proposed development requires to be assessed against the provisions of the South
Lanarkshire Local Development Plan 2 (adopted 2021).  In this instance Policies 3, 5
and DM2 of the development plan and the associated guidance are applicable. 
6.2 Policy 3 – General Urban Area/Settlements of the adopted plan supports the principle
of residential developments in residential designated areas such as the area within
which the application site is located.  The proposal seeks to ensure that proposed
developments do not adversely affect the surrounding area in terms of issues such as
layout, scale, massing and amenity.  With regard to the specific design and layout of
the site, Policy 5 – Development Management and Placemaking requires all proposals
to take account of and be integrated with the local context and built form.  The policy
states that development proposals should have no significant adverse impacts on the
local community in terms of issues such as noise, smell, disturbance and traffic or
public safety issues. 
6.3 Policy DM2 generally reflects the content of Policies 3 and 5 of the adopted plan and
states that proposed developments are required to relate satisfactorily to nearby
development in terms of scale, massing and materials.  Additionally, the policy
requires that development proposals do not adversely affect neighbours by
overshadowing or overlooking their property. 
6.4 The application is for the erection of a three-car garage and store with vehicular access
which will be taken from Moss Road to the south-west.  Due to the geography of
Newton Road and the associated settlement pattern, parking is limited to the front for
a number of properties – including the application site.  The applicant is therefore
proposing to provide parking to the rear of the property by taking access from Moss
Road.  In addition, they are proposing the erection of a two-storey garage with parking
on the lower floor together with associated driveway adjacent.  Planning permission
was previously granted in 2004 for a change of use of garden ground, a rear extension
and a triple garage, however, this consent was never implemented and has since
expired. 
6.5 In terms of design, the proposed garage will be constructed from metal containers and
will be clad in timber.  Whilst this type of design is not common in residential areas, it
is contemporary, and the timber finish is sympathetic to the existing landscaping in
both the application site and the properties adjacent.  In addition, the flat roof of the
garage and timber finish will reduce its visual impact.  Previously a garage/shed was
situated in the rear garden at right angles to the proposed garage, however, this has
29

Page 30

since been removed.  Under the proposal, the applicant will access the garden from
the rear off Moss Road and the access road will open out into a turning area to allow
access and egress into the garage.  On the upper floor, storage is proposed. 
6.6 Whilst there are few buildings in the gardens to the rear of the properties on Newton
Road, a domestic garage is not an uncommon form of development in a residential
area.  It would be unreasonable to expect that the proposal would result in a loss of
privacy to adjacent properties at the site given that it is a domestic garage.  Whilst the
garden is sloping and the structure will require an element of under build, the rear
garden covers a substantial area and will be situated in excess of 23 metres from the
nearest property.  In addition, it will sit below the plot to the south at 24 Moss Road. 
6.7 Adjacent to the site is a mature beech tree which is covered by a Tree Preservation
Order (TPO).  The tree sits outwith the site and does provide amenity to the locality. 
A condition has been attached to ensure that the access road is constructed
appropriately to avoid damaging the tree or its roots. 
6.8 As a result of the statutory neighbour notification process, thirteen letters of objection
were received in relation to this application.  The contents of these representations are
addressed in section five above.  
6.9 In summary, following a full and detailed assessment of the proposed development, it
is considered that it would have no significant adverse impact upon residential or visual
amenity and that it is in accordance with the relevant policies of the adopted South
Lanarkshire Local Development Plan 2 (adopted 2021).  As such, the granting of
planning permission is recommended. 
7 Reasons for Decision
7.1 The proposal complies with policies 2, 3, 5 and DM2 of the adopted South Lanarkshire
Local Development Plan 2 and will have no detrimental impact on character or
amenity. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 29 September 2022 
Previous references
 None 
List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter dated 29 March 2021
► Consultations 
Roads Development Management Team 
Scottish Water 
13.05.2021 
24.09.2021
Arboricultural Services 13.10.2021
Environmental Services 10.06.2021 
► Representations           Dated:
30

Page 31

Keith and Ann Dalzell Dalkin, 15 Newton Road, Strathaven,
South Lanarkshire, ML10 6BQ 
26.04.2021 
Mr William Smith, 24 Moss Road, Strathaven, South
Lanarkshire, ML10 6BY 
19.05.2021 
Colin Frew, Via Email  17.05.2021 
Louise Frew, Via Email  17.05.2021 
John Todd, 8 Newton Road, Strathaven, ML10 6BQ  17.05.2021 
Dr Robert MacNair, Glenbrook House, 22a Lesmahagow
Road, Strathaven, ML10 6DA 
01.05.2021 
Mr John Patrick, 10 Newton Road, Strathaven, Ml106BQ 01.05.2021 
Colin Frew, Via Email  12.05.2021 
John Todd, Via Email  12.05.2021 
Louise Frew, Via Email  12.05.2021 
Mrs Doreen Frew, 15 Lesmahagow Road, Strathaven, ML10
6BG 
05.05.2021 
Mrs Janet Morton, 18 Lesmahagow Road, Strathaven, ML10
6BG 
04.05.2021 
Mr Keith Dalkin, 15 Newton Road, Strathaven, ML10 6BQ  11.05.2022 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Morton, Team Leader, Floor 6, Council Offices, Almada Street, Hamilton, ML3 0AA
Phone: 07551 842 788   
Email: iain.morton@southlanarkshire.gov.uk  
31

Page 32

Detailed planning application 
Paper apart – Application number: P/21/0521 
Conditions and reasons 
01. That no trees within the application site shall be lopped, topped, pollarded or felled, or
otherwise affected, without the prior written consent of the Council as Planning
Authority.   
Reason: In the interests of amenity and to ensure the protection and maintenance of
the existing trees within the site. 
02. That before any work commences on the site, a scheme of landscaping shall be
submitted to the Council as Planning Authority for written approval, and it shall include: 
(a) an indication of all existing trees and hedgerows plus details of those to be
retained and measures for their protection in the course of development; 
(b) details and specification of all trees, shrubs, grass mix, etc., including, where
appropriate, the planting of fruit/apple trees; 
(c) details of any top-soiling or other treatment to the ground; 
(d) sections and other necessary details of any mounding, earthworks and hard
landscaping; 
(e) proposals for the initial and future maintenance of the landscaped areas; 
(f) details of the phasing of these works; and no work shall be undertaken on the
site until approval has been given to these details.   
Reason: To ensure the appropriate provision of landscaping within the site. 
03. That the landscaping scheme required by condition 2 above shall be completed to the
satisfaction of the Council as Planning Authority during the first available planting
season following occupation of the building(s) or completion of the development
hereby approved, whichever is the sooner, and shall thereafter be maintained and
replaced where necessary to the satisfaction of the Council.   
Reason: In the interests of the visual amenity of the area. 
04. That before any development commences on site or before any materials are ordered
or brought to the site, details and samples of all materials to be used as external
finishes on the development shall be submitted to and approved by the Council as
Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
05. That the use of the garage hereby permitted shall be restricted to private use incidental
to the enjoyment of the dwellinghouse on the site and no commercial activity shall be
carried out in or from the garage.   
Reason: To safeguard the residential amenity of the area. 
06. That unless otherwise agreed, prior to the commencement of the development hereby
approved (including any demolition and all preparatory work), a scheme for the
protection of the existing tree to the east of the site shall be submitted to and approved
in writing by the Council as Planning Authority. In accordance with BS 5837:2012, the
32

Page 33

scheme shall include a tree protection plan(s) (TPP) and an arboricultural method
statement (AMS) shall be submitted to and approved in writing by the Council as
Planning Authority. Specific issues to be dealt with in the TPP and AMS: 
a) Location and installation of services/ utilities/ drainage. 
b) Methods of demolition within the root protection area (RPA as defined in BS 5837:
2012) of the retained trees. 
c) Details of construction within the RPA or that may impact on the retained trees. 
d) A full specification for the installation of boundary treatment works. 
e) A full specification for the construction of any roads, parking areas and driveways,
including details of the no-dig specification and extent of the areas of the roads,
parking areas and driveways to be constructed using a no-dig specification.
Details shall include relevant sections through them. 
f) Detailed levels and cross-sections to show that the raised levels of surfacing,
where the installation of no-dig surfacing within Root Protection Areas is
proposed, demonstrating that they can be accommodated where they meet with
any adjacent building damp proof courses. 
g) A specification for protective fencing to safeguard trees during both demolition
and construction phases and a plan indicating the alignment of the protective
fencing. 
h) A specification for scaffolding and ground protection within tree protection zones. 
i) Tree protection during construction indicated on a TPP and construction and
construction activities clearly identified as prohibited in this area. 
j) Details of site access, temporary parking, on site welfare facilities, loading,
unloading and storage of equipment, materials, fuels and waste as well concrete
mixing and use of fires 
k) Boundary treatments within the RPA 
l) Methodology and detailed assessment of root pruning 
m) Arboricultural supervision and inspection by a suitably qualified tree specialist 
n) Reporting of inspection and supervision 
o) Methods to improve the rooting environment for retained and proposed trees and
landscaping 
p) Veteran and ancient tree protection and management. 
The development shall thereafter be implemented in strict accordance with the
approved details. 
Reason:  To ensure that the trees to be retained will not be damaged during demolition
or construction and to protect and enhance the appearance and character of the site
and locality. 
07. That before development starts, full details of the design and location of all fences and
walls, including any retaining walls, to be erected on the site shall be submitted to and
approved by the Council as Planning Authority. 
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
08. That before the development hereby approved is completed or brought into use, a
visibility splay of 2 metres by 25 metres measured from the road channel shall be
provided on both sides of the vehicular access and everything exceeding 0.9 metres
in height above the road channel level shall be removed from the sight line areas and
thereafter nothing exceeding 0.9 metres in height shall be planted, placed or erected
within these sight lines.  
33

Page 34

Reason: In the interests of traffic and public safety. 
09. That notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (as amended), the change of use of
the garage (hereby approved) to living accommodation shall be subject to a further
planning application to the Council as Planning Authority. 
Reason: In order to retain effective planning control. 
10. That prior to development commencing, the applicant shall submit a method statement
in relation to the proposed regrading of the land and no works shall commence until
this statement has been approved in writing by the Council as Planning Authority.   
Reason:  In order to retain effective planning control. 
34

Page 35

35

Page 36

36

Page 37

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/22/0471
Erection of domestic wind turbine 
1 Summary application information
Amended
•  Application type:  Householder
•  
Applicant:  Mr Balhar Singh Sander
•  Location:  1 Fernhill Grange
Bothwell
G71 8SH
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) Grant detailed planning permission (subject to conditions) based on conditions
attached.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
3 Other information
♦ Applicant’s Agent: Ian Denney
♦ Council Area/Ward: 16 Bothwell and Uddingston
♦ Policy Reference(s): South Lanarkshire Local Development Plan 2
Policy 2 - Climate Change
Policy 3 - General Urban Areas
Policy 5 - Development Management and
Placemaking
Policy 14 – Natural and Historic Environment
Policy 18 – Renewable Energy
Policy NHE6 – Conservation Areas
Policy RE1 -Renewable Energy  
5
37

Page 38

♦   Representation(s): 
► 23  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
♦   Consultation(s):   
Environmental Services 
38

Page 39

Planning Application Report 
1 Application Site
1.1 The application site is located at 1 Fernhill Grange and is roughly rectangular in shape,
with a long, narrow driveway projecting to the south-west, connecting the site to
Fernhill Grange.  The site extends to approximately 1,680 square metres in total area. 
Although not located within the Conservation Area itself, the application site is
bounded to its north and east by the Bothwell Conservation Area. 
1.2 The site is located within an existing residential area and is bounded by 3 and 5 Fernhill
Grange to the south, 5 Silverwells to the east, 15 to 19 Silverwells Crescent to the
north, and the Silverwells Court flatted development to the west.  These are all
residential properties. 
1.3 The topography of the site is largely flat although from Fernhill Grange, the driveway
slopes gradually north before levelling out for most of the lower (south) half of the
garden.  The remainder of the garden, between the rear elevation of the dwelling and
the boundary shared with 15 to 19 Silverwells Crescent, slopes sharply upwards from
south to north. 
1.4 The dwellinghouse is located approximately within the centre of the site, with the
garden surrounding it.  The site is bounded on all sides by a mixture of hedgerows and
greenery that provide a substantial amount of screening for the property.  Indeed,
largely only the roofs of neighbouring properties are visible from within the site, apart
from some windows on the Silverwells Court flatted development which are visible
when looking towards the west. 
2 Proposal(s)
2.1 The applicant seeks permission for the erection of a domestic wind turbine within the
garden of 1 Fernhill Grange, Bothwell.  The proposed turbine will be located in the
south-east corner of the application site, adjacent to the boundary with 5 Fernhill
Grange to the south, and an area of open/green space (Rumbolds Acre) adjacent to
Silverwells to the east. 
2.2 The mast of the proposed turbine will measure 6 metres in height, and the total height
of the turbine to the tip of its blades will be 7.5 metres.  The turbine will feature three
blades. 
3 Background
3.1 Local Plan Status
3.1.1 In terms of the adopted South Lanarkshire Local Development Plan 2, the application
site is covered by Policy 3 – General Urban Areas.  This policy considers likely impacts
upon amenity stemming from proposed developments.  Generally, development
detrimental to the amenity of residents and the wider community, or to the character
of the surrounding area, is not permitted.  Policy 5 – Development Management and
Placemaking – is also applicable.  This policy aims to consider the principles of
sustainable development, by ensuring that proposals are well designed and integrate
well with the local area, avoiding any significant adverse impact upon the local
community and environment. 
3.1.2 Although not located within the Bothwell Conservation Area, the application site is
located adjacent to it and therefore it remains a material consideration.  Policy 14 -
Natural and Historic Environment – and Policy NHE6 – Conservation Areas – are
therefore also applicable to this application.  Collectively, these policies seek to protect
39

Page 40

important natural and historic sites from adverse impacts from development. 
Development affecting a Conservation Area should preserve or enhance the unique
character of that Conservation Area and the siting/scale of any development should
be appropriate to the Conservation Area also. 
3.1.3 Policy 2 – Climate Change – is also applicable to the application, and states that new
development proposals should utilise renewable energy sources where possible.  This
policy reflects the need to support developments that will help meet the Scottish
Government’s target of having 50% of Scotland’s energy consumption coming from
renewable sources by 2030 (Scottish Government’s Energy Strategy, 2017).  In this
respect, Policy 18 – Renewable Energy – and Policy RE1 – Renewable Energy – are
both also applicable and collectively seek to support applications for renewable energy
developments, subject to their assessment against the principles of Scottish Planning
Policy (SPP).  South Lanarkshire Council also has guidance on such developments
included within the Renewable Energy Supporting Planning Guidance, which is a
material consideration. 
3.2 Relevant Government Advice/Policy
3.2.1 The Scottish Government aims to encourage sustainable development and the use of
renewable energy sources is key to that aim.  Scottish Planning Policy supports the
development of renewable energy and states that Planning Authorities should support
the development of a diverse range of renewable energy technologies.  Development
Plans should support the wider application of medium and smaller scale renewable
technologies such as decentralised energy supply systems, community, and
household projects.  Development Plans should also encourage micro generation
projects including those associated with or attached to existing buildings. 
3.2.2 Further advice from the Scottish Government is provided by Planning Advice Note 45
– Renewable Energy Technologies with additional information provided within PAN45
Annex – planning for micro renewables.  The Annex to PAN45 states that the
Government is committed to increasing the amount of renewable energy generated
and used in Scotland.  Increased use of renewable energy, including micro-
renewables, can make an important contribution to efforts to reduce carbon emissions
in support of climate change and renewable energy targets.  The Annex provides
further support for the use of micro-renewables and provides several examples of the
kinds which can be used.  The examples which are provided at a domestic level are
wind, solar thermal, photovoltaic, heat pumps and biomass technologies. 
3.2.3 In relation to domestic wind turbines, the Annex to PAN45 states that they have been
used for several years to provide electricity in both domestic and commercial locations. 
The power generated and associated carbon emission reductions per turbine are
relatively small, but cumulative benefits could be significant.  The use of domestic wind
turbines is to be encouraged by the Scottish Government given that Scotland has the
best wind resource in Europe.  In relation to siting and design, the visual impact of the
micro wind turbine depends on how they are seen both in terms of the image they
convey and their siting and composition.  Micro-wind turbines can be seen as symbols
of positive action to address climate change and promote sustainability.  The erection
of a turbine must be undertaken in a manner that keeps the environmental impact to
a minimum whilst still ensuring they provide sufficient power.  Sensitive siting and
design in both urban and rural areas can reduce visual intrusion and play a part in
making these installations an accepted feature. 
3.2.4 The siting and design of micro-wind systems should aim to minimise the contrast with
the surroundings.  This can be achieved by using simple shapes with clean lines,
developing a balanced composition in proportion to the surrounding environment; and
40

Page 41

using regularity, order, and symmetry wherever possible.  In relation to historic
environments, the Annex states that there are opportunities for wind turbines in
conservation areas or within the curtilage of listed buildings.  Care should be taken to
ensure that the turbine respects the site and area. 
3.2.5 The impact on amenity, as stated in the Annex, should be considered when siting a
turbine.  In terms of noise from micro-wind turbines, it will generally be of an acceptable
level, with newer turbines having greatly reduced noise levels due to improved blade
design and reduced mechanical noise.  In terms of shadow flicker, this is unlikely to
occur due to the small scale of a domestic wind turbine. 
3.3 Planning Background
3.3.1 A previous application for the erection of a wind turbine at 1 Fernhill Grange was
submitted in 2009 (Reference HM/09/0589) and was approved by the Hamilton Area
Committee, subject to several conditions.  Should consent be granted, many of these
same conditions would be imposed on the consent. 
3.3.2 The current application is identical to that approved in 2009, both in terms of the
positioning of the turbine and its height.  The 2009 application received a total of 11
objections, compared to the 23 objections submitted for the current application. 
3.3.3 A prior application for the erection of a wind turbine within the site (HM/09/0384) was
withdrawn by the applicant.  This turbine was proposed for a different location within
the site, to the rear of the dwellinghouse. 
3.3.4 There have been no significant changes to policy within the last 13 years that would
justify the reversal of the previous decision to approve the application.  Indeed, given
the Local Development Plan 2’s focus on sustainability and climate change, there is
arguably more precedent for such an application now than when it was first proposed
and approved in 2009. 
4 Consultation(s)
4.1 Consult – Environmental Services 
Response:  Offered no objections to the proposal, subject to the attachment of two
conditions and two advisory notes.  The conditions relate to limiting noise generation
and minimising the potential for shadow flicker respectively.  Both conditions require
the submission of further information to the Planning Authority for their consideration. 
5 Representation(s)
5.1 Statutory neighbour notification was undertaken and an advert for non-notification of
neighbours was displayed/published in the Hamilton Advertiser.  In response, 23
letters of objection were received from 23 neighbouring proprietors.  The grounds of
the objections are summarised as follows:- 
a) The size of the proposal will negatively impact upon views from
surrounding/nearby residential properties.
Response:  Residents are not afforded the right to any view and as such, any
impact upon/loss of a view is not a material planning consideration and is not a
sufficient ground to warrant the refusal of an application. 
b) The proposed wind turbine will have an unacceptable impact in terms of
noise, with noise levels likely exceeding that acceptable within a
residential area during both the day and night.  
41

Page 42

Response:  The Council’s Environmental Services department were
consulted on the application in this regard and offered no adverse comments.
However, they advised that should consent be granted, a condition should be
imposed ensuring that noise generated by the proposal does not exceed
acceptable levels within a residential area.  The condition would further require
that information confirming the compliance with the noise control levels be
submitted to the Council for consideration/approval. 
c) The proposal will negatively impact upon house prices/the value of
adjacent and nearby properties.
Response:  Impact upon property values/house prices is not a material
planning consideration and as such, does not constitute sufficient grounds to
warrant a refusal of the application. 
d) How will the proposal benefit the applicant and what will happen in the
future when the applicant no longer owns/resides at the dwellinghouse?
Response:  There is no requirement for the proposal to benefit anyone other
than the applicant.  It will be the responsibility of the applicant and of any future
owner of the site to maintain the proposed wind turbine to a satisfactory degree,
or to remove it at their own discretion. 
e) What benefit will the proposal bring to the neighbouring properties and to
the local area as a whole?
Response:  There is no requirement for a domestic wind turbine such as the
one proposed to provide any benefit to the neighbouring properties or to the
local area.  The application is only assessed to ensure no significant adverse
impacts result from the proposal, and to ensure that the proposal preserves the
character and amenity of the urban/natural/historic environment. 
f) A nearby area of land (Rumbolds Acre) is joint owned by numerous
nearby residents, many of whom were not notified as part of the
Neighbour Notification process.
Response:  The Neighbour Notification process ensures that all properties
within 20 metres of the boundary of the application site are issued letters
informing them of the proposal.  If a property/area of land does not have an
address, or the owners of the property/land are not known/cannot be identified,
an advert for the Non-Notification of Neighbours will also be published in the
local newspaper. 
An advert for the Non-Notification of Neighbours in relation to the proposal was
published in the Hamilton Advertiser on 28 April 2022.  As such, the Council
has taken the appropriate action to ensure all relevant stakeholders have been
notified of the proposal and allowed time to make comments/submit objections. 
g) The proposal may impact upon the feasibility/possibility of future
developments or proposals upon the land at Rumbolds Acre.
Response:  The application must be assessed on its own merits within the
existing context and not against potential impacts in terms of restricting future
proposals on nearby sites. 
h) I was not notified of the proposal despite my property being within the
Conservation Area and within 25 metres of the proposal site.  
42

Page 43

Response:  The Neighbour Notification process, as undertaken by the
Council, issues letters to all properties within 20 metres of the boundary of the
application site.  If a property is more than 20 metres from the application site
boundary, no notification letter would have been issued. 
i) The application does not include details of the proposed design,
materials, or general appearance of the wind turbine.
Response:  Should consent be granted a standard condition will be attached
ensuring that, before any development commences, details and samples of all
colours to be used as external finishes on the turbine and mast shall be
submitted to and approved by the Council as Planning Authority. 
j) No assessment has been made/submitted alongside the application with
regards to the potential impact of shadow flicker upon neighbouring
properties. 
Response: Whilst the above is noted, the Council’s Environmental Services
department were consulted on the application in this regard.  Whilst they have
offered no objections to the application, they have advised a condition be
attached ensuring an assessment of the impact of shadow flicker on properties
in the vicinity of the site is undertaken by the applicant and submitted to the
Council for approval, prior to the proposal being brought into use. 
k) The siting of the turbine so close to the boundary may result in its blades
intruding upon/overhanging the boundary into the Conservation Area,
depending on the orientation of the turbine, as determined by wind
direction.
Response:  The site of the proposed turbine is such that, regardless of its
orientation, at no point would its blades overhang the boundary of the
application site or cross over into the Conservation Area. 
l) The proposal will have a strong adverse impact upon the character of the
Bothwell Conservation Area by way of its appearance/prominence.
Response:  Whilst the application site and the location of the proposal are not
within the Conservation Area, it is noted that the proposal will be located
adjacent to and will be visible from the Conservation Area.  However, it is
considered that due to the positioning of the turbine within the site, the level of
screening provided by surrounding trees and hedgerows, and the height of the
turbine relative to the height of the dwellinghouse within the application site, the
proposal will have a minimal impact upon the distinct character of the
Conservation Area.  The turbine will not be located so prominently as to have
any significant adverse impact on the character or appearance of the
Conservation Area. 
m) The proposal will negatively impact upon wildlife and biodiversity within
the area; therefore a survey should be completed and the proposal should
be located away from hedgerows/trees.
Response:  Whilst the potential for adverse impact upon wildlife stemming
from wind turbines is noted, a domestic turbine of this scale does not present
an unacceptable level of threat to any such wildlife or biodiversity. 
Indeed, as the proposal relates to an established developed area, the proposed
turbine would likely have no greater degree of impact upon wildlife in the area
than other aspects of developed areas, such as traffic, traffic noise and
associated exhaust fumes. 
43

Page 44

n) The proposal will impact upon burrowing animals because of the
generation, storage and transportation of electricity stemming from the
proposal.
Response:  Similar to point m) above, a domestic turbine of this scale is
unlikely to present an unacceptable level of threat to any such burrowing
animals.  Given that the application site is within an established residential area,
it is fair to assume that the erection of houses and their associated foundations
within the vicinity would likely have had some degree of impact upon any
burrowing animals within the area. 
Given the developed nature of the area, it is not considered that this reason for
objection would hold sufficient justification to prevent any other development,
of any type, within the locale. 
o) The proposal may impact upon/cause disruption to TV, radio and internet
signals for surrounding properties.
Response:  It is considered that the siting and scale of the turbine, given that
it will be screened by large trees and will be lower in height than the existing
dwellinghouse on site, will minimise any potential disruption to
telecommunication signals or similar, within the immediate area.  The proposal
will be situated a sufficient distance away from all the neighbouring dwellings to
minimise any such adverse impacts. 
p) The proposal will have significant adverse impact upon the physical and
mental health of nearby residents.
Response:  It is considered that the impact of a domestic turbine compared to
a large-scale wind farm turbine is significantly different.  The noise output from
a domestic turbine will be significantly less intrusive and its impact will be
reduced proportionally.  Furthermore, it is considered that there is sufficient
distance from the turbine to the nearest dwellings to not have a significant or
unacceptable noise impact. 
q) The proposal will disrupt the local skyline due to its prominent location
within the settlement.
Response:  Given the proposed turbine is lower in height than the existing
dwellinghouse within the application site, it will not appear prominently within
the skyline and therefore there will be no adverse impacts in terms of visual
prominence. 
r) Permitted Development Rights only permit such a development if it is
located 100m or more away from any neighbouring dwelling, and the
proposed turbine is situated much closer than this.
Response:  Whilst the above is true, Permitted Development refers to
development that is exempt from requiring planning permission. The above
distance is not applicable in this instance as the proposal seeks planning
permission and is not being erected under Permitted Development legislation. 
s) All residents living within proximity of the application site should have
been issued notification from the Council.
Response:  As previously stated, all neighbours living within 20 metres of the
boundary of the application site were issued a Neighbour Notification letter by
the Council.  Furthermore, an advert for the Non-Notification of Neighbours was
published in the Hamilton Advertiser on 28 April 2022.  
44

Page 45

Appropriate procedures were undertaken by the Council to ensure all relevant
neighbours and stakeholders were notified/made aware of the proposal and
that an advert was placed in the local press. 
t) No technical data about the proposed wind turbine has been submitted/is
available on the Portal.
Response:  Whilst the above is noted, the Council’s Environmental Services
were consulted on the application to provide comments in terms of noise,
shadow flicker, etc.  They required no further information/technical data to
provide a response in this regard and therefore such information was not
considered necessary in the determination/assessment of the application. 
u) The proposal is in too close proximity to neighbouring dwellings.
Response:  There is no current minimum distance between residential
properties and wind turbines specified within Scottish Government guidance.  It
is considered that the location of the turbine within the site is appropriate to
ensure it is a sufficient distance from the surrounding neighbouring properties. 
v) The proposal will be an eyesore due to minimal screening from trees, etc.
Response: It is considered that there is sufficient screening from trees/hedges
afforded to the application site, and that the height of the proposed turbine is
minimal, thereby limiting any potential for it being an eyesore within the local
area. 
w) There are alternative methods of electricity generation better suited to a
domestic setting, such as solar panels and heat exchanges.
Response: Whilst the above is noted, it is the role of the Planning Authority to
assess the application as presented and not to advise/speculate on whether
alternative proposals would be more appropriate. 
x) The height and width of the proposed turbine are surely too large to truly
be considered domestic.
Response:  The term “domestic” in this instance largely refers to the fact that
the turbine would generate electricity solely for the dwellinghouse within the
application site, and not on a larger scale.  Regardless, the size of the turbine
is considered appropriate within a domestic setting, given that it measures 7.5
metres high, and this is lower than the height of the existing dwellinghouse
within the site. 
y) The timing of the submission and the associated Neighbour Notification
was over a holiday period, giving neighbours little or no time to respond
which may have been purposeful/deliberate on behalf of the applicant to
avoid reaction/objections from neighbours.
Response:  Given that the application was received and validated on 25
March 2022, it is considered that the application has been under the
consideration of the Council for a sufficient time to allow all interested parties to
make comments or submit objections.  All relevant neighbours were notified,
and further notification was made via an advert published in the Hamilton
Advertiser in relation to the proposal. 
z) Local residents pay high Council Tax and as such should be entitled to
have a say in what development occurs within the neighbourhood.  
45

Page 46

Response:  All residents across South Lanarkshire Council, and Scotland
overall, are entitled to the same level of representation in relation to
developments occurring within their local area regardless of their Council Tax
band.  The appropriate notification and advertisement processes have been
undertaken by the Council to ensure all relevant stakeholders have been made
aware of the proposal and given the opportunity to make comments and/or
objections to it. 
aa) All properties within 100 metres of the proposal should have the right to
be notified of the proposal by law.
Response:  Planning legislation within Scotland requires that all properties
within 20 metres of the application boundary be notified.  There is no law
stipulating that all properties within 100 metres of the site should be notified. 
bb) The application, if approved, could set a precedent for similar proposals
within the area.
Response:  It is a well-established principle that each planning application
must be assessed on its own merits, taking account of the provisions of the
Development Plan and all other material considerations.  Indeed, in this regard
applications will only be approved where they comply with Local Plan policy and
do not have an adverse impact upon the amenity of the area. 
cc) The proposal is not an appropriate form of development within an
established residential area.
Response:  Whilst it is accepted that currently such a form of development is
not common within developed or residential areas, consent has previously been
approved for a turbine at this location.  It is considered that the proposed wind
turbine is of such a size and positioning to minimise its impact on the wider
residential area, and that the application site benefits from a garden of sufficient
size and boundary screening to accommodate the proposal. 
Within South Lanarkshire, a notable example of a similar form of development
was the erection of two wind turbines (slightly larger than the proposed) within
the grounds of Blacklaw Primary School, East Kilbride.  This application
(EK/08/0154) was approved by the Planning Committee in 2009.  It is noted
that both turbines have since been removed. 
dd) There is a danger of ice forming on the blades of the turbine during winter
then falling and causing damage or injury.
Response:  It is considered that due to both the height and the siting of the
wind turbine, away from any public footways and not within the immediate
vicinity of any neighbouring dwellinghouses, that it sufficiently minimises any
risks of such danger. Indeed, the danger of such damage or injuries is likely no
greater than that of ice forming on and falling from the roof/soffits of a dwelling. 
ee) The proposal will result in irritation/annoyance of Council staff by way of
the number of complaints the proposal will generate.
Response:  The above does not constitute a material planning consideration
and is not sufficient grounds to warrant a refusal of the application.  It is the role
of the Local Authority to receive and handle any complaints received,
regardless of volume.  
46

Page 47

ff) Lack of maintenance of the proposed wind turbine may result in parts
falling from the turbine and damaging nearby properties – no details of
risk mitigation to prevent this have been submitted as part of the
application.
Response:  If approved, it is the role of the applicant to ensure proper
installation and maintenance of the wind turbine to a satisfactory degree.  Any
issue or concerns in this regard should be referred to the Health and Safety
Executive in the first instance. 
gg) The appearance of the turbine is more akin to an industrial area than a
residential area of a historic village.
Response:  The appearance of the turbine is standard of most wind turbines,
albeit on a smaller scale.  Whilst it is noted that such a development is not
common within a residential area such as the application site, it is considered
that sufficient measures have been taken (by way of the size and positioning of
the turbine) to limit its visual impact upon the immediate surrounding area and
Bothwell as a whole. 
hh) Solar panels would surely be a more effective means of electricity
generation within such a location?
Response:  As previously stated, whilst the above is noted, it is the role of the
Planning Authority to assess the application as presented and not to
advise/speculate on whether alternative proposals would be more appropriate. 
The determination of this application would not prevent the applicant from
considering installing solar panels either now or at some point in the future. 
ii) The proposal has not been assessed in terms of the relevant policies of
South Lanarkshire Council’s Local Development Plan 2.
Response: All planning applications submitted to South Lanarkshire Council
are assessed against the relevant policies of the Local Development Plan 2.
Details of which policies this application has been assessed against can be
found in Section 3 of this report, while an assessment of the application against
these policies can be found in Section 6. 
jj) The application does not include details of the exact location of the
turbine or its location relative to nearby trees.
Response:  The Block Plan and Section drawing submitted in support of the
application indicate both the location of the proposed turbine within the
application site, and its relation to both nearby trees and the adjacent
dwellinghouse on site.  Photos taken during a site visit on 21 April 2022 further
established the location of the proposed turbine in relation to the trees and other
greenery within and around the site. 
kk) The proposal is not a static structure and, because of its moving blades,
will have a much higher visual impact than many other forms of static
development.
Response: The kinetic nature of the structure is noted and the potential for
greater visual impact has been considered during the assessment of the
application. 
ll) The low aspect and height of the turbine, whilst being camouflaged by the
trees, will result in a high visual impact but a low level of electricity
generation, and this is in contradiction of the Annex to PAN45  
47

Page 48

Response:  The low aspect and height of the turbine will serve to lower the
visual impact of the proposal and reduce any adverse impact upon
neighbouring properties.  Should this lower aspect/positioning result in a low
level of electricity generation, it is not of concern for the consideration of the
planning application. 
mm) The Committee Report for the previous wind turbine application at this
site referred heavily to the Annex to PAN45 but does not indicate that the
drive to use renewables should override the usual planning processes.
Response:  The desire/drive to use renewables should not override the usual
planning processes.  In this instance, an application has been submitted for
consideration in the normal manner, allowing an assessment of the proposal to
be made and a report to be submitted to the Planning Committee.   
5.2 These letters are available for inspection on the planning portal. 
6 Assessment and Conclusions
6.1 The application relates to the erection of a 7.5m high domestic wind turbine situated
on a free-standing mast within the garden ground of an existing dwelling at 1 Fernhill
Grange, Bothwell.  The main determining issues in this instance are compliance with
Local Plan policy and the visual and amenity impact on the surrounding area. 
6.2 The turbine is proposed to be located within the southeast corner of 1 Fernhill Grange,
situated adjacent to Rumbolds Acre, an area of open space provided for the residents
of Silverwells.  The nearest residential property to the turbine, other than the dwelling
on site, is 5 Fernhill Grange which is situated 20m away.  Along the boundary of the
site there is a high level of screening, especially along the eastern boundary with
Rumbolds Acre which is prominently made up of fir trees.  The area surrounding the
site is residential in character, with the properties to the north and east being within
the Bothwell Conservation Area.  The turbine itself and the application site is outwith
the Conservation Area but will be visible from it. 
6.3 In terms of Local Development Plan policy, the application site falls within the General
Urban Area under Policy 3, and is adjacent to the Bothwell Conservation Area,
covered by Policies 14 and NHE6.  Each of these policies is focused on preserving
residential and visual amenity, preserving the distinct local character of the area in
general terms resists development which is detrimental to this. Policy 5 – Development
Management and Placemaking provides further criteria which are required to be
complied with. Development is required to take account of local context and built form
and should be compatible with adjacent buildings and the surrounding streetscape.
Policies 14 and NHE6 provide a framework to protect and enhance the character and
appearance of the Conservation Area and oppose development which will have an
adverse impact. 
6.4 Taking account of the above policies, it is considered that the proposed wind turbine
is acceptable.  The turbine will not have a material or adverse impact upon the existing
levels of residential amenity.  Visually it is not considered to be intrusive and will not
represent an over dominant feature within the local environment.  The turbine is to
have a maximum height of 7.5m to the tip of the blade which is approximately 1.9m
lower than the highest point of the existing dwelling on site.  Furthermore, the turbine
will be well screened from most viewpoints due to the existing fir trees on site.  Both
factors combined reduce its visual dominance.  The wind turbine itself is of a domestic
scale and is unlikely to be any more visually intrusive than other development which
already exists in the area.  
48

Page 49

6.5 In terms of Government guidance and policy, which has been summarised in section
3.2 of this report, strong support is provided for the development of micro renewables. 
Due to the wind resource which Scotland has, the development of domestic wind
turbines is encouraged.  It is considered by the Government that they do not represent
an intrusive feature within the built form when sited appropriately and are necessary
in reducing carbon output/footprints. 
6.6 In conclusion, it is considered that the proposed wind turbine is acceptable in relation
to the relevant Local Plan policies.  The turbine is unlikely to have an adverse impact
upon the existing levels of residential amenity.  Visually the turbine will not be an overly
dominant feature within the area due to the existing built form and the level of natural
screening.  The turbine itself will be 1.9m lower in height than the existing dwelling on
site, and as such remains a subsidiary structure to the house.  In terms of noise, it is
considered that the turbine will be unlikely to have any significant adverse impact upon
amenity.  If noise nuisance does occur, Environmental Services can take appropriate
action to address the same.  In addition, consent has previously been granted for the
same domestic turbine at this location and there would be no justification to now
recommend refusal of the proposal. 
6.7 Overall and having due regard to the Development Plan and all other material planning
considerations, the recommendation is to approve this application as it complies with
Local Plan policy, government guidance and will not have an adverse impact upon
amenity. 
7 Reasons for Decision
7.1 The proposal will have no significant adverse impact on amenity, and it complies with
the relevant policies of the adopted Local Development Plan 2 (Policies 2, 3, 5, 14, 18,
NHE6 and RE1).  There are no other material considerations that would justify refusing
planning permission. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 29 September 2022 
Previous references
 HM/09/0589 – Erection of wind turbine within garden ground of dwelling, application
approved by Hamilton Area Committee – 9 June 2010
 HM/09/0384 – Erection of wind turbine within rear garden of dwellinghouse, application
withdrawn
 EK/08/0154 – Installation of two 6 kw wind turbines on 15 metre poles (Blacklaw Primary
School, East Kilbride), application approved by Planning Committee – 28 April 2009 
List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► South Lanarkshire Council Supporting Planning Guidance – Renewable Energy
► Scottish Planning Policy
► PAN 45 and PAN 45 Annex
► Neighbour notification letter dated 01.04.2022
► Non-notification of neighbours (Hamilton Advertiser) published 28.04.2022  
49

Page 50

► Consultations  
Environmental Services 15.08.2022 
► Representations           Dated:
Mr David Marshall, 8 Silverwells, Bothwell, Glasgow, G718AZ  11.04.2022 
Mrs Anne Maclean, Lyndhurst, 4 Silverwells, Bothwell,
G718AZ 
21.04.2022 
Neil And Georgina Cameron, 14 Old Mill Road, Bothwell,
Glasgow, South Lanarkshire, G71 8AY 
06.05.2022 
Mr David Calder, Received Via Email  27.04.2022 
Laura J Murphy, By Email  14.04.2022 
Mr Kevin Moore, 9 Old Mill Road, Glasgow, G718AY  21.04.2022 
Mrs Anne Crawford, 7 Fernhill Grange, Bothwell, G71 8SH  22.04.2022 
John Brogan, 12 Old Mill Road, Bothwell, G71 8AY  22.04.2022 
Mrs Alison Robertson, 10 Old Mill Road, Bothwell, G71 8AY  22.04.2022 
Dr Laura J Murphy (on behalf of owners of Rumbolds Acre), 6
Silverwells, Bothwell 
25.04.2022 
Mrs Margaret Butterly, 6A Silverwells, Bothwell, G71 8AZ  17.04.2022 
Raymond Murphy, 6 Silverwells, Bothwell, G71 8AZ  21.04.2022 
Mrs Anne & David Ellis, 3 Old Mill Road, Bothwell, Glasgow,
G71 8AY 
18.04.2022 
Mr David Maxwell, 12 Old Mill Road, Bothwell, Glasgow, G71
8AY 
21.04.2022 
Dr Donald Maclean, 4 Silverwells, Bothwell, Glasgow, G71
8AZ 
21.04.2022 
Mr Frederick Denton, 14b, Fernhill Grange, Bothwell, G718SH  18.04.2022 
Miss Elizabeth Creeley, 2 Silverwells Court, Bothwell G71 8LT  30.04.2022 
Mr David Barclay, 4 Fernhill Grange, Bothwell, Glasgow, G71
8SH 
19.04.2022 
David Kennedy, 5 Fernhill Grange, Bothwell, Glasgow, South
Lanarkshire, G71 8SH 
22.04.2022 
50

Page 51

Mrs Janice Walker, 15 Silverwells Crescent, Bothwell, G71
8DR 
22.04.2022 
Bill Copeland, 6 Silverwells Court, Bothwell, Glasgow, South
Lanarkshire, G71 8LT 
19.05.2022 
Mr Stephen Russell, 1 Silverwells Court, Bothwell, G71 8LT  22.04.2022 
Mr Adrian Coia, 3 Fernhill Grange, Bothwell, Glasgow, South
Lanarkshire, G71 8SH 
20.04.2022 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
David Grant, Graduate Planning Officer, Floor 6, Council Offices, Almada Street, Hamilton,
ML3 0AA
Phone: 07551 841 174
Email: david.grant@southlanarkshire.gov.uk  
51

Page 52

Detailed planning application 
Paper apart – Application number: P/22/0471 
Conditions and reasons 
01. In accordance with ETSU- R- 97 (Simplified Method) the noise from the wind turbine
must not exceed an LA90,10min of 35dB at the boundary of the curtilage of any noise
sensitive premises at all times at wind speeds of up to 10 metres per second at 10m
height as measured within the site. Further information confirming the compliance with
the requirement shall be submitted to the Planning Authority for their consideration.   
A full ETSU-R-97 assessment will be required where cumulative emissions are present
and result in an LA90,10min of more than 35dB.   
Reason: In the interest of amenity and to limit adverse impact by way of noise within
the local area. 
02. The proposed layout of the scheme may give rise to potential shadow flicker within
sensitive properties.  Prior to the proposed development being brought into use, the
applicant shall undertake an assessment of the impact of shadow flicker on properties
in the vicinity of the site and shall submit the assessment to the Council, as Planning
Authority for approval.  Where the assessment identifies a property as being affected
by shadow flicker then the assessment shall include measures to mitigate this.
Cognisance shall be taken of the Department of Energy and Climate Change
document 'Update of UK Shadow Flicker Evidence Base' in undertaking the
assessment.   
Reason: In the interest of amenity and to limit any potential adverse impact stemming
from shadow flicker resulting from the development. 
03. In the event that turbine becomes obsolete or redundant it must be removed, and the
site reinstated to the satisfaction of the Planning Authority within 2 months. 
Reason: In the interests of residential and visual amenity. 
04. That, for the avoidance of doubt, the mast and turbine hereby approved when
measured from ground level to the tip of the blade shall not exceed 7.5 metres. 
Reason: To retain effective planning control and to minimise any adverse impact upon
neighbouring residential properties. 
05. That before any development commences on site details and samples of all colours to
be used as external finishes on the turbine and mast shall be submitted to and
approved by the Council as Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area.    
52

Page 53

53

Page 54

54

Page 55

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/21/2093
Erection of 37 dwellinghouses and 16 flats with associated roads,
landscaping and infrastructure (Approval of matters specified in
conditions imposed on consent HM/10/0052) 
1 Summary application information
Amended
•  Application type:  Approval of matters specified in conditions
•  
Applicant:  Taylor Wimpey West Scotland 
•  Location:  Land to the north of Meikle Earnock Road
Hamilton
South Lanarkshire  
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) Grant Matters Specified in Conditions - Subject to Conditions (based on the conditions
attached).
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
(2) This development is located within the Hamilton Community Growth Area
and will be covered by the Planning Obligation which was agreed as part of
the planning permission in principle application (HM/10/0052) for the site. 
The purpose of the Planning Obligation is to ensure the submission of an
equitable financial contribution, on an agreed pro-rata basis, in relation to
infrastructure and other costs associated with the Hamilton Community
Growth Area, namely Roads Infrastructure, Education Provision, Community
Facilities and Affordable Housing. 
6
55

Page 56

3 Other information
♦ Applicant’s Agent: 
♦ Council Area/Ward: 18 Hamilton West and Earnock
♦ Policy Reference(s): South Lanarkshire Local Development Plan 2
(Adopted April 2021) 
Policy 1 - Spatial Strategy
Policy 2 - Climate Change
Policy 5 - Development Management and
Placemaking
Policy 11 - Housing
Policy 15 - Travel and Transport
Policy DM1 - New Development Design
Policy SDCC4 - Sustainable Transport 
Residential Design Guide 
♦   Representation(s): 
► 0  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
♦   Consultation(s):   
Scottish Water 
Community and Enterprise Resources - Play Provision Community
Contributions 
West of Scotland Archaeology Service 
Roads Development Management Team 
Roads Flood Risk Management 
Environmental Services 
Housing Planning Consultations 
Countryside and Greenspace 
56

Page 57

Planning Application Report
1 Application Site
1.1 The planning application site extends to approximately 1.9ha and comprises an area
of vacant grassland.  The site is located to the north of Meikle Earnock Road, to the
west of Hamilton, and is identified as being part of the Hamilton Community Growth
Area (CGA) within the adopted South Lanarkshire Local Development Plan 2. 
1.2 The site is enclosed to the north, east and west by vacant grassland and to the south
by Meikle Earnock Road.  The site is enclosed by vacant land which forms part of the
Hamilton Community Growth Area and will also be the subject of future residential
development.  Construction work has commenced at the Hamilton Community Growth
Area although development is far from being completed. 
2 Proposal(s)
2.1 The applicant seeks approval for the Matters Specified in Conditions (MSC) application
which seeks to address the terms of the conditions attached to the Planning
Permission in Principle application (HM/10/0052) relative to the development of the
Hamilton Community Growth Area (HCGA) and relates solely to the site identified
above. 
2.2 The proposal relates to the erection of 37 dwellinghouses and 16 flats with associated
roads, landscaping and infrastructure at land to the north of Meikle Earnock Road. 
The proposal relates to the provision of a range of accommodation for the social rented
sector and includes a mix of two, three and four bedroom dwellings in the form of
terraces, semi-detached and detached properties.  These dwellings are two storeys in
height.  In addition, the development includes one and two bedroom cottage flats,
which are two storeys in height.  Externally the properties are proposed to be finished
in a combination of render, stone, facing brick and glazing panels.  Parking would be
provided for each property. 
2.3 The development includes the formation of a new vehicular and pedestrian access to
the development from Meikle Earnock Road and other pedestrian and vehicle links
into the wider community growth area. 
2.4 A number of documents were submitted in support of the application, namely an
Archaeological Evaluation and a Habitat and Protected Species Survey. 
3 Background
3.1 Local Plan Status
3.1.1 The determining issues in the consideration of this application are its compliance with
the adopted South Lanarkshire Local Development Plan 2 and its impact on residential
amenity, traffic safety and infrastructure issues. 
3.1.2  The planning application site is designated as being part of a Community Growth Area
for Hamilton and as forming part of the Council’s housing land supply.  Residential
uses are supported within such sites, subject to compliance with normal development
management criteria.  The site is affected by Policy 1 ‘Spatial Strategy,’ Policy 2
‘Climate Change,’ Policy 5 ‘Development Management and Place Making,’ Policy 11
‘Housing,’ Policy 15 ‘Travel and Transport,’ Policy DM1 ‘New Development Design’
and Policy SDCC4 ‘Sustainable Transport’ of the adopted Local Development Plan. 
3.2 Relevant Government Advice/Policy
3.2.1 In terms of residential development, Scottish Planning Policy requires Councils to
maintain a five year supply of effective housing land.  Planning Authorities are also
57

Page 58

required to promote the efficient use of land by, where possible, directing development
towards sites within existing settlements in order to make effective use of established
infrastructure and service capacity. 
3.2.2 Designing Streets ‘A Policy Statement for Scotland’ was introduced in March 2010 and
establishes the Scottish Government’s commitment to move away from a standardised
engineering approach to streets and to raise the quality of design in urban and rural
development.  Development layouts should be designed to encourage a safe
environment for pedestrians and cyclists with narrower streets, carefully positioned
dwellings, landscaping and off-street parking which can be more effective at achieving
slower traffic movements.  Permeability which encourages walking is now seen as a
high priority and footpath links are encouraged to ensure that houses can be easily
accessed from main public transport routes. 
3.3 Planning Background
3.3.1 An application for the ‘Development of Community Growth Area, Comprising Housing,
Neighbourhood Centre, Community Facilities, Access Roads, Open Space and
Landscaping (Planning in Principle application: HM/10/0052)’ was granted consent on
11 May 2017. 
4 Consultation(s)
4.1 Scottish Water - have offered no objection to the proposal. 
Response: Noted. 
4.2 Community and Enterprise Resources - Play Provision Community
Contributions – no objection as any contributions would be addressed through the
existing planning obligation covering the community growth area. 
Response: Noted. 
4.3 West of Scotland Archaeology Service - have offered no objection to the proposal.
Response: Noted. 
4.4 Roads Development Management Team – had initially advised that the developer
would require to identify the position of the electric vehicle charging points within the
development layout, particularly in relation to the courtyard parking arrangements. 
These details have now been submitted and they have advised that they have no
objection to the development, subject to the imposition of conditions.  These conditions
relate to the provision of wheel washing facilities, the submission of details of all the
site staff and operatives parking requirements and that all HGV traffic associated with
the construction of the development shall utilise the Muttonhole Road/Meikle Earnock
Road route for access and egress of the site.
Response: Noted.  It is advised that these requirements can be addressed through
the use of planning conditions, where appropriate. 
4.5 Roads Flood Risk Management - have advised that a flood risk assessment which
covers the wider CGA site has been previously prepared and submitted.  They have
offered no objection to the proposal subject to the imposition of conditions relating to
the submission of a post development overland flow path drawing and the completion
of the appendices from the Council’s developer design guidance.
Response: Noted.  It is advised that these requirements can be addressed through
the use of planning conditions, where appropriate. 
4.6 Environmental Services - have advised that they have no objection to the
development, subject to the imposition of advisory notes relating to construction noise
and nuisance. 
58

Page 59

Response: Noted.  It is advised that these requirements can be addressed through
the use of advisory notes, where appropriate. 
4.7  Housing Planning Consultations – the provision of social housing was addressed
through the planning obligation which covers the community growth area.
Response: Noted. 
4.8 Countryside and Greenspace - have advised that they have no objection to the
development but noted that the remote path specifications should be the same as the
adjacent developments.
Response: Noted.  It is advised that these requirements can be addressed through
the use of a condition, where appropriate. 
5 Representation(s)
5.1 Statutory neighbour notification was undertaken and the proposal was advertised in
the local press and subsequently no third-party representations have been received. 
Whilst this itself does not automatically mean that consent should be issued, it does
suggest that those most likely to be affected by the proposal do not have any serious
reservations regarding the development. 
6 Assessment and Conclusions
6.1 The applicant seeks approval for the matters specified in conditions application to
address the terms of conditions attached to planning permission in principle
application (HM/10/0052) relating to the development of the Hamilton Community
Growth Area.  The application relates to the erection of 37 dwellinghouses and 16 flats
with associated roads, landscaping and infrastructure at land to the north of Meikle
Earnock Road, Hamilton. 
6.2 The determining issues in the consideration of this application are its compliance with
national policy, local development plan policy and its impact on residential amenity,
traffic safety, environmental matters and infrastructure issues. 
6.3 With regards to Government guidance and advice, as detailed in section 3.2, Scottish
Planning Policy highlights that where a proposal accords with up-to-date development
plans, it should be considered acceptable in principle.  The site is identified within the
adopted Local Development Plan as being suitable for residential development
through its designation as a part of the Community Growth Area for Hamilton.  The
proposed use therefore raises no issues from a land use perspective and can be
considered to accord with national planning policy. 
6.4 In terms of Local Plan policy, the site is affected by Policies 1 and 2 of the adopted
Local Development Plan.  The application site is designated as being a Community
Growth Area for Hamilton under the terms of Policy 1 of the adopted Local
Development Plan.  These policies promote sustainable economic growth and
regeneration, a move towards a low carbon economy, the protection of the natural and
historic environment and mitigation against the impacts of climate change.  The
proposal involves the development of an area of vacant land, at a sustainable location
in Hamilton as part of the Community Growth Area.  Therefore, it is considered that
the proposal raises no issues within the context of Policies 1 and 2 of the adopted
Local Development Plan. 
6.5 In addition, the site is affected by Policy 11 of the adopted Local Development Plan
and forms part of the Council’s housing land supply.  Subsequently, the principle of
the site for residential use accords with the provisions of Policy 11 of the adopted Local
Development Plan. 
59

Page 60

6.6 Policy 5 of the adopted Local Development Plan identifies that all development
proposals will require to take account of and be integrated with the local context and
built form.  It is considered that the design, location and scale of the proposed
development is acceptable and will not result in a significant material impact on the
streetscape or any nearby properties.  Therefore, the proposal raises no issues within
the context of Policy 5 of the adopted Local Development Plan. 
6.7 Policy DM1 of the adopted Local Development Plan relates to the design and layout
of all new developments.  Given the physical characteristics of the site, it is considered
that the development will not result in a significant adverse impact on the neighbouring
properties in terms of privacy, overlooking, overshadowing and the proposed
dwellinghouses are of a similar scale and style to those being developed elsewhere
within the Hamilton CGA.  Subsequently, the proposed development accords with the
provisions of Policy DM1 of the adopted Local Development Plan.  In addition, it is
considered that the proposed layout for the development generally accords with the
standards set out in the Council’s Residential Design Guide. 
6.8 Policy 15 and Policy SDCC4 of the adopted Local Development Plan seek to ensure
that the development considers and, where appropriate, mitigates the resulting
impacts of traffic growth and encourages sustainable transport options that take
account of the need to provide proper provision for walking, cycling and public
transport.  The site is accessible and the development would be integrated into
transport walking networks.  In addition, Roads and Transportation Services consider
that the proposal is acceptable in terms of access, parking and road safety issues. 
Subsequently, it is considered that the proposal accords with the provisions of Policies
15 and SDCC4 of the adopted Local Development Plan. 
6.9 In conclusion, the proposal relates to the creation of a high quality housing
development on a vacant site which will provide affordable accommodation for the
social rented sector.  The design, layout and general impact of the development is
considered to be acceptable and the proposals comply with the relevant policies
contained in the adopted Local Development Plan.  In view of the above, it is
recommended that planning consent be granted subject to conditions. 
7 Reasons for Decision
7.1 The proposal will not significantly adversely impact on residential or visual amenity,
environmental matters or infrastructure issues.  The proposal raises no issues within
the policy context of 1, 2, 5, 11, 15, DM1 and SDCC4 of the adopted Local
Development Plan 2 and there are no other material considerations which would justify
the refusal of planning permission. 
David Booth 
Executive Director (Community and Enterprise Resources) 
Date: 30 September 2022 
Previous references
 HM/10/0052 – Planning Committee – 28 March 2017 
60

Page 61

List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Press Advert, Hamilton Advertiser, dated 10 February 2022   
► Consultations 
Scottish Water 09.02.2022
West of Scotland Archaeology Service 09.02.2022
Roads Development Management Team 14.04.2022
22.09.2022  
Roads Flood Risk Management 19.08.2022
Environmental Services 02.02.2022
Countryside and Greenspace 
Community and Enterprise Resources - Play Provision 
Community Contributions 
Housing Planning Consultations                                                                                 
11.08.2022 
N/A 
N/A 
► Representations           
None 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Gail Neely, Planning Officer, Floor 6, Council Offices, Almada Street, Hamilton, ML3 0AA
Phone: 07551 841 002   
Email: gail.neely@southlanarkshire.gov.uk 
61

Page 62

Detailed planning application 
Paper apart – Application number: P/21/2093 
Conditions and reasons
01. That, unless otherwise agreed with the Council as Planning Authority, the landscaping
and open space schemes shall be completed to the satisfaction of the Council as
Planning Authority during the first available planting season following occupation of
the building(s) or the completion of the development hereby approved, whichever is
the sooner, and shall thereafter be maintained and replaced where necessary to the
satisfaction of the Council.   
Reason: In the interests of amenity. 
02. That prior to works commencing on site a management plan for the maintenance and
management of the structural planting within the site shall be submitted to the Council
as Planning Authority.  Following written approval, the management plan shall be
thereafter implemented to the satisfaction of the Council as Planning Authority.   
Reason: In order to retain effective planning control. 
03. That prior to the occupation of each dwellinghouse the approved fences and walls
associated with each plot shall be erected and thereafter maintained to the satisfaction
of the Council as Planning Authority.   
Reason: In order to retain effective planning control. 
04. That, unless otherwise agreed in writing and prior to works commencing on site, the
applicant shall submit details to demonstrate each dwelling has access to their own
electric vehicle charging (EVC) point.  Where parking is provided within a shared
courtyard, details shall also include arrangements for siting of charging posts taking
account of parking bays/boundary features/pedestrian movement along with
maintenance arrangements all for the written approval of the Council as Roads
Authority.  Thereafter, the agreed EVC provision shall be installed, commissioned, and
maintained in accordance with the approved plans and specifications prior to that
property which it serves being occupied.     
Reason: To ensure the provision of appropriate facilities on site. 
05. Prior to commencement of the development hereby approved, details of measures to
facilitate the provision of full fibre broadband to serve the development, including
details of appropriate digital infrastructure and a timescale for implementation, shall be
submitted to and approved in writing by the Council as Planning Authority, unless
otherwise agreed in writing with the applicant.  The approved measures shall thereafter
be carried out in accordance with the agreed implementation timescale.   
Reason: To ensure the provision of digital infrastructure to serve the development. 
06. That no dwellinghouse shall be occupied until the site is served by a sewerage scheme
constructed in accordance with Scottish Water standards and as approved by the
Council as Planning Authority in consultation with Scottish Water as Sewerage
Authority.   
Reason: To ensure the provision of a satisfactory sewerage system.  
62

Page 63

07. That, unless otherwise agreed with the Council as Planning Authority, before the
development hereby approved is completed or brought into use, the entire access road
and footpath network, including un-adopted remote footpaths, serving the
development shall be laid out and constructed in accordance with the specification of
the Council as Roads and Planning Authority.   
That no dwellinghouse shall be occupied until the access roads and footpaths leading
thereto from the existing public road have been constructed in accordance with the
specification of the Council as Roads and Planning Authority.  Unless otherwise
agreed with the Council as Planning and Roads Authority, all footpaths shall be 2.0
metres in width and be of a bound construction.   
Reason: In the interest of public safety. 
08. That prior to the commencement of any works associated with the development, a
Construction Traffic Management Plan shall be submitted to and approved in writing
by the Council as Roads and Planning Authority and implemented thereafter.  This
document shall include details of access and a parking provision (including a parking
plan) for staff and operatives, intended working hours, the management and storage
of deliveries and the wheel washing facilities. 
Reason: In order to retain effective planning control. 
09. That no development shall commence until details of surface water drainage
arrangements have been submitted to and approved in writing by the Council as
Planning Authority; such drainage arrangements will require to comply with the
principles of sustainable urban drainage systems and with the Council's Sustainable
Drainage Design Criteria and shall include signed appendices as required.  The
development shall not be occupied until the surface drainage works have been
completed in accordance with the details submitted to and approved in writing by the
Council as Planning Authority.     
Reason: To ensure that the disposal of surface water from the site is dealt with in a
safe and sustainable manner, to return it to the natural water cycle with minimal
adverse impact on people and the environment and to alleviate the potential for on-
site and off-site flooding. 
10. That further details of the remote footpath specification shall be submitted to and
approved in writing by the Council as Planning Authority and these should accord with
the developments adjacent to the site.   
Reason: In order to retain effective planning control.  
11.   That no development shall commence until pre-construction protected species
surveys are carried out within the development site and an appropriate surrounding
buffer in accordance with the submitted Habitat and Protected Species Survey
prepared by Envirocentre (dated August 2021).  Where protected species are found
to be present and could be impacted by the development, a species protection plan
should be submitted to and approved in writing by the Council as Planning Authority. 
Reason: In order to retain effective planning control.  
63

Page 64

12. That prior to any works commencing on site an adequate wheel washing facility must
be fully operational and any vehicle transporting excavated material on or off the site
shall be treated by means of the wheel washing provision.  This facility shall be
operation at all times during any earth moving operations and a ‘clean zone’ should
be maintained between the end of the wheel wash facility and the public road to the
satisfaction of the Council as Roads and Planning Authority. 
Reason: To ensure the provision of appropriate facilities on site. 
13. For the avoidance of doubt, all HGV traffic associated with the construction of the
development shall utilise the Muttonhole Road/Meikle Earnock Road route for both
access and egress to the satisfaction of the Council as Roads and Planning Authority. 
Reason: In order to retain effective planning control.
14. Prior to the occupation of any dwelling within the development, the associated parking
spaces for each dwelling shall be formed in accordance with the approved plans and
thereafter shall be available for use at all times. 
Reason: In order to ensure adequate parking is provided within the development. 
64

Page 65

65

Page 66

66

Page 67

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/21/1811
Residential development (153 units) with associated roundabout,
roads, landscaping and SUDS (relating to consent HM/10/0052) 
1 Summary application information
Amended
•  Application type:  Detailed planning application
•  
Applicant:  CALA Homes and Barratt Homes 
•  Location:  Land West of Strathaven Road
Hamilton 
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) Grant detailed planning permission (subject to conditions) based on conditions
attached.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
(2) Planning permission should not be issued until an appropriate obligation under
Section 75 of the Planning Act, and/or other appropriate agreement, has been
concluded between the Council, the applicants and the site owner(s).  This
planning obligation should ensure that appropriate financial contributions are
made at appropriate times during the development towards other costs
associated with the Hamilton Community Growth Area, namely Roads
Infrastructure, Education Provision, Community Facilities and Affordable
Housing 
In accordance with agreed procedure, should there be no significant 
progress, on behalf of the applicant, towards the conclusion of the Planning 
Obligation within 6 months of the date of the Committee, the proposed 
development may be refused on the basis that, without the planning 
control/developer contribution which would be secured by the Planning 
Obligation, the proposed development would be unacceptable.  
7
67

Page 68

If, however, this matter is being progressed satisfactorily, the applicant will be
offered the opportunity to enter into a Processing Agreement, if this is not
already in place.  This will set an alternative agreed timescale for the conclusion
of the Planning Obligation. 
All reasonable legal costs incurred by the Council in association with the above
Section 75 Obligation shall be borne by the developers. 
3 Other information
♦ Applicant’s Agent: Andrew Woodrow
♦ Council Area/Ward: 18 Hamilton West and Earnock
♦ Policy Reference(s): Policy 1 - Spatial Strategy
Policy 2 - Climate change
Policy 5 - Development Management and
Placemaking
Policy 11 - Housing
Policy 15 - Travel and Transport
Policy DM1 - New Development Design
Policy SDCC4 - Sustainable Transport 
Residential Design Guide 
♦   Representation(s): 
► 0  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
♦   Consultation(s):   
Roads Development Management Team 
Roads Flood Risk Management 
Environmental Services 
Countryside and Greenspace 
Community and Enterprise Resources - Play Provision Community
Contributions 
Scottish Water 
West of Scotland Archaeology Service 
Strathclyde Partnership for Transport (SPT) 
SP Energy Network 
The Coal Authority Planning and Local Authority Liaison 
Housing Planning Consultations 
SEPA Flooding 
68

Page 69

Planning Application Report
1 Application Site
1.1 The planning application site extends to approximately 10.46 ha.  The site relates to
former agricultural land and contains the residential property Chapelfield House and
an agricultural building.  In addition, there are existing trees within the northern
boundary of the site. 
1.2 The site is situated adjacent to the south west of Hamilton, directly adjacent to
Strathaven Road, and is identified as being part of the Hamilton Community Growth
Area (CGA) within the adopted South Lanarkshire Local Development Plan 2.  The
site is enclosed to the north by vacant land which forms part of the Hamilton
Community Growth Area and to the east by existing residential properties.  In addition,
the site is enclosed to the south by Strathaven Road and to the west by agricultural
land.  Construction work has commenced at the Hamilton Community Growth Area
although the overall development is far from being completed. 
2 Proposal(s)
2.1 The applicant seeks detailed planning consent for ‘residential development (153 units)
with associated roundabout, roads, landscaping and SUDS (relating to consent
HM/10/0052) at land to the west of Strathaven Road, Hamilton. 
2.2 The proposal relates to the erection of 153 dwellings which includes a range of semi-
detached and detached house types which will provide a mix of three, four and five
bedroom accommodation.  The proposed dwellings are two storeys in height and
several of the dwelling types have integrated garages and some have associated
detached garages.  Each property would benefit from dedicated parking.  The
dwellings are two storeys in height and externally the dwellings are proposed to be
finished in a combination of render, stone walling, glazing panels and concrete roof
tiles.  In addition, some of the dwellings are proposed to have photovoltaic panels
integrated within the roof structure. 
2.3 The development also includes the formation of a four arm roundabout from
Strathaven Road which links to a primary spine road, an established key route through
the Hamilton Community Growth Area.  In addition, the proposal includes a SUDS
area to the north east of the site.  Along the western boundary of the site a new
Greenbelt boundary will be formed. 
2.4 A number of documents were submitted in support of the application, namely a
Planning Statement, Tree Survey, Noise Assessment, Ground Investigation Report,
Flood Risk Assessment, Transport Statement and a Drainage Strategy Report. 
3 Background
3.1 Local Plan Status
3.1.1 The determining issues in the consideration of this application are its compliance with
the adopted South Lanarkshire Local Development Plan 2 and its impact on residential
amenity, traffic safety and infrastructure issues. 
3.1.2  The planning application site is designated as being part of a Community Growth Area
for Hamilton and as forming part of the Council’s housing land supply.  Residential
uses are supported within such sites, subject to compliance with normal development
management criteria.  The site is affected by Policy 1 ‘Spatial Strategy,’ Policy 2
‘Climate Change,’ Policy 5 ‘Development Management and Place Making,’ Policy 11
‘Housing,’ Policy 15 ‘Travel and Transport,’ Policy DM1 ‘New Development Design’
and Policy SDCC4 ‘Sustainable Transport’ of the adopted Local Development Plan. 
69

Page 70

3.2 Relevant Government Advice/Policy
3.2.1 In terms of residential development, Scottish Planning Policy requires Councils to
maintain a five year supply of effective housing land.  Planning Authorities are also
required to promote the efficient use of land by, where possible, directing development
towards sites within existing settlements in order to make effective use of established
infrastructure and service capacity. 
3.2.2 Designing Streets ‘A Policy Statement for Scotland’ was introduced in March 2010 and
establishes the Scottish Government’s commitment to move away from a standardised
engineering approach to streets and to raise the quality of design in urban and rural
development.  Development layouts should be designed to encourage a safe
environment for pedestrians and cyclists with narrower streets, carefully positioned
dwellings, landscaping and off-street parking which can be more effective at achieving
slower traffic movements.  Permeability which encourages walking is now seen as a
high priority and footpath links are encouraged to ensure that houses can be easily
accessed from main public transport routes. 
3.3 Planning Background
3.3.1 An application for the ‘Development of Community Growth Area, Comprising Housing,
Neighbourhood Centre, Community Facilities, Access Roads, Open Space and
Landscaping (Planning in Principle application: HM/10/0052)’ was granted consent on
11 May 2017. 
3.3.2  A Prior Notification has been submitted to the Planning Service for the ‘Demolition of
Buildings (Chapelfield House)’ (P/22/1200) for this planning application site. 
4 Consultation(s)
4.1 Roads Development Management Team - have advised that they have no objection
to the development, subject to the imposition of conditions.  These conditions relate to
the design of the roundabout, visibility splays, the submission of a Bus Service
Strategy, parking and the submission of a Construction Traffic Management Plan.
Response: Noted.  It is advised that these requirements can be addressed through
the use of planning conditions, where appropriate. 
4.2 Roads Flood Risk Management - no response to date although they have previously
advised that they have no objection in principle to development within the community
growth area subject to appropriate conditions. 
Response: Noted. 
4.3 Environmental Services - had raised concerns in relation to the potential internal
noise levels within some of the dwellings and the proposed noise mitigation at the site. 
They subsequently requested that further information be submitted by the agent. 
Environmental Services has reviewed the updated information and have advised that
it is considered acceptable, subject to the imposition of a condition relating to noise at
the site.  In addition, they have advised that they have no objection to the development,
subject to the imposition of conditions relating to the submission of a piling method
statement, the submission of an air quality impact assessment and advisory notes
relating to dust, nuisance and pest control.
Response: Noted.  It is advised that these requirements can be addressed through
the use of conditions and advisory notes, where appropriate. 
4.4 Countryside and Greenspace – have advised that they have no objection to the
development, subject to the imposition of conditions relating to the incorporation of
right of way SH25/, aspirational core path HM/5633/1 and the extension of the
constructed path directly adjacent to the eastern site boundary.  In addition, they have
70

Page 71

advised that the new path to be formed adjacent to the SUDS area shall be designed
for shared use to allow for cycling.
Response: Noted.  It is advised that these requirements can be addressed through
the use of planning conditions, where appropriate. 
4.5 Community and Enterprise Resources - Play Provision Community
Contributions – as this site is not currently subject to a planning obligation,
contributions should be required as part of a planning obligation on the same terms as
the overall community growth area.
Response: Noted. 
4.6 Scottish Water - have offered no objection to the proposal. 
Response: Noted. 
4.7 West of Scotland Archaeology Service - have advised that they have no objection
to the proposal, subject to the imposition of a condition relating to the implementation
of a programme of archaeological works at the site.
Response: Noted.  It is advised that these requirements can be addressed through
the use of a planning condition, where appropriate. 
4.8 SPT - no response to date.
Response: Noted. 
4.9 SP Energy Network - have offered no objection to the proposal.
Response: Noted. 
4.10 The Coal Authority - have offered no objection to the proposal. 
Response: Noted. 
4.11 Housing Planning Consultations - no response to date.  The issue of social
housing provision within the community growth area (CGA) has previously been
dealt with through a planning obligation covering the CGA.  This development would
be required to enter into and conclude a planning obligation on similar terms.
Response: Noted. 
4.12 SEPA Flooding – initially requested that a Flood Risk Assessment (FRA) was
submitted in relation to the application.  The agent submitted the requested FRA,
however, following a review of this document they objected to the proposal on the
basis that the proposed development is likely to place buildings and people at flood
risk contrary to Scottish Planning Policy.  The agent provided a response to the issues
raised in the form of a technical memo and SEPA subsequently removed their
objection to the proposal.
Response: Noted. 
5 Representation(s)
5.1 Statutory neighbour notification was undertaken and the proposal was advertised in
the local press and subsequently no third-party representations have been received. 
Whilst this itself does not automatically mean that consent should be issued, it does
suggest that those most likely to be affected by the proposal do not have any serious
reservations regarding the development. 
6 Assessment and Conclusions
6.1 The applicant seeks detailed planning consent for residential development (153 units)
with associated roundabout, roads, landscaping and SUDS (relating to consent
HM/10/0052) at land to the west of Strathaven Road, Hamilton. 
71

Page 72

6.2 The determining issues in the consideration of this application are its compliance with
national policy, local development plan policy and its impact on residential amenity,
traffic safety, environmental matters and infrastructure issues. 
6.3 With regards to Government guidance and advice, as detailed in section 3.2, Scottish
Planning Policy highlights that where a proposal accords with up-to-date development
plans, it should be considered acceptable in principle.  The site is identified within the
adopted Local Development Plan as being suitable for residential development
through its designation as part of the Community Growth Area for Hamilton.  The
proposed use therefore raises no issues from a land use perspective and can be
considered to accord with national planning policy. 
6.4 In terms of Local Plan policy, the site is affected by Policies 1 and 2 of the adopted
Local Development Plan.  The application site is designated as being a Community
Growth Area for Hamilton under the terms of Policy 1 of the adopted Local
Development Plan.  These policies promote sustainable economic growth and
regeneration, a move towards a low carbon economy, the protection of the natural and
historic environment and mitigation against the impacts of climate change.  The
proposal involves the development of an area of vacant land, at a sustainable location
in Hamilton as part of the Community Growth Area.  Therefore, it is considered that
the proposal raises no issues within the context of Policies 1 and 2 of the adopted
Local Development Plan. 
6.5  In addition, the site is affected by Policy 11 of the adopted Local Development Plan
and forms part of the Council’s housing land supply.  Subsequently, the principle of
the site for residential use accords with the provisions of Policy 11 of the adopted Local
Development Plan. 
6.6 Policy 5 of the adopted Local Development Plan identifies that all development
proposals will require to take account of and be integrated with the local context and
built form.  It is considered that the design, location and scale of the proposed
development is acceptable and will not result in a significant material impact on the
streetscape or any nearby properties.  Therefore, the proposal raises no issues within
the context of Policy 5 of the adopted Local Development Plan. 
6.7 Policy DM1 of the adopted Local Development Plan relates to the design and layout
of all new developments.  Given the physical characteristics of the site, it is considered
that the development will not result in a significant adverse impact on the neighbouring
properties in terms of privacy, overlooking, overshadowing and the proposed
dwellinghouses are of a similar scale and style to those being developed elsewhere
within the Hamilton CGA.  Subsequently, the proposed development accords with the
provisions of Policy DM1 of the adopted Local Development Plan.  In addition, it is
considered that the proposed layout for the development generally accords with the
standards set out in the Council’s Residential Design Guide. 
6.8 Policy 15 and Policy SDCC4 of the adopted Local Development Plan seek to ensure
that development considers and, where appropriate, mitigates the resulting impacts of
traffic growth and encourages sustainable transport options that take account of the
need to provide proper provision for walking, cycling and public transport.  The site is
accessible and the development would be integrated into transport walking networks. 
Conditions can be attached to any consent to ensure that the path layout incorporates
the existing right of way and aspiration core path to the north of the site.  In addition,
Roads and Transportation Services consider that the proposal is acceptable in terms
of access, parking and road safety issues.  Subsequently, it is considered that the
proposal accords with the provisions of Policies 15 and SDCC4 of the adopted Local
72

Page 73

Development Plan.  Whilst there will be a degree of disruption during construction,
conditions are proposed which include measures such as the provision and agreement
of a Traffic Management Plan.  The purpose is to minimise disruption as much as
possible during the construction phase of the development.  Whilst work has been
ongoing with the Hamilton Community Growth Area for a number of years, it is
important that any disruption is minimised and Ward Councillors and the relevant
Community Council recently met with Council Officers.  It is anticipated that further
meetings will be arranged and monitoring undertaken in order to ensure that the
development is being undertaken in accordance with the agreed details. 
6.9 In conclusion, the proposal relates to the creation of a high quality housing
development on a vacant site and the design, layout and general impact of the
development is considered to be acceptable and the proposals comply with the
relevant policies contained in the adopted Local Development Plan.  In view of the
above, it is recommended that planning consent be granted subject to conditions. 
However, the issue of consent should be withheld until the conclusion of the
associated planning obligation under Section 75 of the Planning Act, or other
appropriate legal agreement. 
7 Reasons for Decision
7.1 The proposal will not significantly adversely impact on residential or visual amenity,
environmental matters or infrastructure issues.  The proposal raises no issues within
the policy context of 1, 2, 5, 11, 15, DM1 and SDCC4 of the adopted Local
Development Plan 2 and there are no other material considerations which would justify
the refusal of planning permission. 
David Booth 
Executive Director (Community and Enterprise Resources) 
Date: 30 September 2022 
Previous references
 HM/10/0052 – Planning Committee – 28 March 2017
 P/22/1200 
List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter, dated 29 October 2021
► Press Advert, Hamilton Advertiser, dated 11 November 2021
► Initial Update Surveys, dated August 2021, prepared by Heritage Environmental
Limited
► Planning Statement, dated October 2021, prepared by Barton Wilmore
► Tree Survey and Arboriculture Constraints Report, dated 28 October 2021, prepared
by Alan Motion Tree Consulting Ltd 
► Environmental Noise Assessment for Proposed Residential Development, dated
June 2022, prepared by The Airshed
► Ground Investigation Report, dated February 2022, prepared by Johnson, Poole and
Bloomer Ltd 
► Flood Risk Assessment, dated February 2022, prepared by Kay Consulting Limited
► Transport Statement, dated December 2021, prepared by Dougall Baillie Associates 
► Drainage Strategy Report, dated October, 2021, prepared by Dougall Baillie
Associates 
73

Page 74

► Consultations 
Roads Development Management Team 30.09.2022 
Roads Flood Risk Management N/A
Environmental Services 12.08.2022
Countryside and Greenspace 04.11.2021
Community and Enterprise Resources - Play Provision
Community Contributions 
N/A
Scottish Water 04.11.2021
West off Scotland Archaeology Service 19.11.2021
Strathclyde Partnership for Transport (SPT) N/A
SP Energy Network 02.11.2021
The Coal Authority Planning and Local Authority Liaison 14.12.2021
Housing Planning Consultations N/A
SEPA Flooding 19.07.2022
02.03.2022  
► Representations 
None 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Gail Neely, Planning Officer, Floor 6, Council Offices, Almada Street, Hamilton, ML3 0AA
Phone: 07551 841 002   
Email: gail.neely@southlanarkshire.gov.uk  
74

Page 75

Detailed planning application 
Paper apart – Application number: P/21/1811 
Conditions and reasons
01. That, unless otherwise agreed with the Council as Planning Authority, the landscaping
and open space schemes shall be completed to the satisfaction of the Council as
Planning Authority during the first available planting season following occupation of
the building(s) or the completion of the development hereby approved, whichever is
the sooner, and shall thereafter be maintained and replaced where necessary to the
satisfaction of the Council.     
Reason: In the interests of amenity. 
02. That prior to works commencing on site a management plan for the maintenance and
management of the structural planting within the site shall be submitted to the Council
as Planning Authority.  Following written approval, the management plan shall be
thereafter implemented to the satisfaction of the Council as Planning Authority.     
Reason: In order to retain effective planning control. 
03. That prior to the occupation of each dwellinghouse the approved fences and walls
associated with each plot shall be erected and thereafter maintained to the satisfaction
of the Council as Planning Authority.     
Reason: In order to retain effective planning control. 
04. That, unless otherwise agreed in writing and prior to works commencing on site, the
applicant shall submit details to demonstrate each dwelling has access to their own
electric vehicle charging (EVC) point.  Thereafter, the agreed EVC provision shall be
installed, commissioned, and maintained in accordance with the approved plans and
specifications prior to that property which it serves being occupied.       
Reason: To ensure the provision of appropriate facilities on site. 
05. Prior to commencement of the development hereby approved, details of measures to
facilitate the provision of full fibre broadband to serve the development, including
details of appropriate digital infrastructure and a timescale for implementation, shall be
submitted to and approved in writing by the Council as Planning Authority, unless
otherwise agreed in writing with the applicant.  The approved measures shall thereafter
be carried out in accordance with the agreed implementation timescale.     
Reason: To ensure the provision of digital infrastructure to serve the development. 
06. That no dwellinghouse shall be occupied until the site is served by a sewerage scheme
constructed in accordance with Scottish Water standards and as approved by the
Council as Planning Authority in consultation with Scottish Water as Sewerage
Authority.     
Reason: To ensure the provision of a satisfactory sewerage system. 
75

Page 76

07. That, unless otherwise agreed with the Council as Planning Authority, before the
development hereby approved is completed or brought into use, the entire access road
and footpath network, including un-adopted remote footpaths, serving the
development shall be laid out and constructed in accordance with the specification of
the Council as Roads and Planning Authority.     
That no dwellinghouse shall be occupied until the access roads and footpaths leading
thereto from the existing public road have been constructed in accordance with the
specification of the Council as Roads and Planning Authority.  Unless otherwise
agreed with the Council as Planning and Roads Authority, all footpaths shall be 2.0
metres in width and be of a bound construction.     
Reason: In the interest of public safety. 
08. That prior to the commencement of any works associated with the development, a
Construction Traffic Management Plan shall be submitted to and approved in writing
by the Council as Roads and Planning Authority and implemented thereafter.  This
plan should include details of access and parking provision for staff and visitors,
intended working hours, the management and storage of deliveries and further
information regarding the provision of wheel washing facilities to prevent mud being
carried on to the adopted road.  For the avoidance of doubt, all vehicular access
to/from the development should be via Strathaven Road.   
Reason: In order to retain effective planning control. 
09. That no development shall commence until details of surface water drainage
arrangements have been submitted to and approved in writing by the Council as
Planning Authority; such drainage arrangements will require to comply with the
principles of sustainable urban drainage systems and with the Council's Sustainable
Drainage Design Criteria and shall include signed appendices as required.  The
development shall not be occupied until the surface drainage works have been
completed in accordance with the details submitted to and approved in writing by the
Council as Planning Authority.       
Reason: To ensure that the disposal of surface water from the site is dealt with in a
safe and sustainable manner, to return it to the natural water cycle with minimal
adverse impact on people and the environment and to alleviate the potential for on-
site and off-site flooding. 
10. That the internal noise levels at any location within the new dwellings with windows
open (or under exceptional circumstances closed) shall not exceed- 
a) An LAeq,16hr of 40dB daytime (07:00-23:00) and an LAeq,8hr of 30dB night-time
(23:00-07:00). 
b) The internal LAmax shall not exceed 45dB night-time (23:00-07:00) 
c) The external levels shall not exceed an LAeq,16hr of 55dB daytime in any rear
garden areas, when measured free-field.   
Reason: In order to retain effective planning control. 
11. That no piling works shall be carried out on the site until a method statement has been
submitted to and approved in writing by the Planning Authority.  This statement shall
include an assessment of the impact of the piling on surrounding properties, taking
into account the guidance contained in BS 6472: 1992 'Evaluation of human exposure
to vibration in buildings.  It shall detail any procedures which are proposed to minimise
the impact of noise and vibration on the occupants of surrounding properties.  This
76

Page 77

statement shall be prepared by a suitably qualified person, and the piling works shall
thereafter be carried out in accordance with the approved method statement.   
Reason: These details have not been submitted or approved. 
12. That an air quality impact assessment shall be submitted to and approved in writing
by the Council as Planning Authority.  This document shall satisfy the Planning
Authority that the Local Air Quality Management Objectives for the pollutants specified
in the Air Quality Regulations, made under Part IV of the Environment Act 1995, will
not be exceeded at any of the proposed dwellings due to the impacts of the proposed
development and, or the potential increase in traffic associated with the development. 
The survey and report should use a method based on the principles set out in the
Environmental Protection UK document Development Control: Planning for Air Quality
(2010 Update) and Scottish Government publication 'Local Air Quality Management
Technical Guidance LAQM.TG(09)' or a method that has been agreed with the
Planning Authority.   
Reason: In order to retain effective planning control.  
13. (a) That remediation of the site shall be carried out in accordance with an approved
remediation plan prior to the proposed development being brought into use.  Any
amendments to the approved remediation plan shall not be implemented unless
approved in writing by the Council as Planning Authority. 
(b) On completion of the remediation works, the developer shall submit a completion
report to the Council as Planning Authority, confirming that the works have been
carried out in accordance with the approved remediation plan and that the works have
successfully reduced these risks to acceptable levels. 
(c) Any previously unsuspected contamination which becomes evident during the
development of the site shall be brought to the attention of the Council as Planning
Authority within one week or earlier of it being identified.  A more detailed site
investigation to determine the extent and nature of the contaminant(s) and a site-
specific risk assessment of any associated pollutant linkages, shall then require to be
submitted to and approved in writing by the Council as Planning Authority.   
Reason: To ensure the appropriate remediation of the site. 
14. That before any development commences on site, a scheme for the control and
mitigation of dust shall be submitted to and approved in writing by the Council as
Planning Authority.  No changes to the approved scheme shall take place unless
agreed in writing by the Council as Planning Authority.  The scheme shall thereafter
be implemented in accordance with a programme to be agreed in writing with the
Council as Planning Authority.   
Reason: These details have not been submitted or approved. 
15. That no development shall take place within the application site as outlined in red on
the approved plan until the developer has secured the implementation of a programme
of archaeological works in accordance with a written scheme of investigation which
has been submitted by the applicant, agreed by the West of Scotland Archaeology
Service, and approved in writing by the Planning Authority.  Thereafter the developer
shall ensure that the programme of archaeological works is fully implemented and that
all recording and recovery of archaeological resources within the development site is
undertaken to the satisfaction of the Planning Authority in agreement with the West of
Scotland Archaeology Service.  
77

Page 78

Reason: These details have not been submitted or approved. 
16. That no development shall commence until pre-construction protected species
surveys are carried out within the development site and an appropriate surrounding
buffer in accordance with the submitted Initial Update Surveys, prepared by Heritage
Environmental Limited (dated August 2021).  Where protected species are found to be
present and could be impacted by the development, a species protection plan should
be submitted to and approved in writing by the Council as Planning Authority.   
Reason: In order to retain effective planning control.  
17. That right of way SH25/ and aspirational core path HM/5633/1 shall be incorporated
into the layout and shall include a constructed path which extends directly adjacent to
the eastern site boundary and if access control is required this shall be in the form of
a self closing gate.  In addition, the new path to be formed adjacent to the SUDS area
shall be a shared use to allow for cycling.  Details of the extended path network shall
be submitted to, approved in writing and subsequently implemented to the satisfaction
of the Council as Planning Authority.   
Reason: To protect the existing right of way and extend the path network. 
18. That all works at the site shall be undertaken in accordance with the findings of the
Tree Survey and Arboriculture Constraints Report, prepared by Alan Motion Tree
Consulting Ltd (dated 28 October 2021), to the satisfaction of the Council as Planning
Authority. 
Reason: To protect established species. 
19. That the proposed roundabout within the site shall be designed in accordance with the
DMRB (CD 116) and a Stage 2 Road Safety Audit shall be undertaken and submitted
to and approved in writing by the Council prior to commencement of this aspect of the
works on site.  Following completion of these works, a Stage 3 Road Safety Audit shall
be undertaken, submitted to and approved in writing by the Council as Planning and
Roads Authority. 
Reason: These details have not been submitted or approved. 
20. That prior to the commencement of works on site, a phasing plan shall be submitted
to, approved in writing and subsequently implemented to the satisfaction of the
Council as Planning and Roads Authority. 
Reason: These details have not been submitted or approved. 
21. That a Bus Service Strategy, which shall include the full length of the spine road and 
consider the bus stops and future bus stops on Meikle Earnock Road, shall be
submitted to, approved in writing by the Council and shall be fully implemented, prior
to the occupation of any dwellinghouse within the adjacent residential development.  
Reason: These details have not been submitted or approved. 
22. That unless otherwise agreed in writing with the Planning Authority, all construction
vehicles associated with the development hereby approved shall access the site
from the spine road only.  
78

Page 79

Reason: In order to retain effective planning control. 
23. For the avoidance of doubt, there shall be no retaining walls/structures which will
impact on the adoptable roads. 
Reason: In order to retain effective planning control.
24. That all pedestrian and cyclepaths should be designed to national cycle route
standards to the satisfaction of the Council as Planning and Roads Authority.
Reason: In order to retain effective planning control.
25. That each dwelling should have a minimum number of vehicle parking spaces as
follows: 
1 bedroom – 1 space
2/3 bedrooms – 2 spaces
4 or more bedrooms – 3 spaces 
Each of these spaces being in units of 6m x 3m and garages having less than the
required internal dimensions of 7m x 3m would not qualify as a formal parking space. 
Reason: To ensure adequate parking provision on the site. 
26. That no dwellinghouse shall be occupied until the parking spaces associated with the
dwellinghouse shall be constructed in accordance with the approved plans to the
specification and satisfaction of the Council as Roads and Planning Authority.
Reason: To ensure adequate parking provision on the site. 
27. For the avoidance of doubt, no driveways or off-street parking bays should have a
gradient steeper than 10%. 
Reason: In order to retain effective planning control.
28. That before any dwellinghouse within the development hereby approved is
completed or brought into use, the first two metres (minimum) of the associated
driveway shall be surfaced, trapped, and sealed to prevent any deleterious material
or water from leaving the driveway to the satisfaction of the Council as Roads and
Planning Authority.   
Reason: In the interests of traffic safety and to prevent deleterious material entering
the roads. 
29. That before the development hereby approved is completed or brought into use, at
all road junctions with the spine road, a visibility splay of 4.5metres by 90 metres
measured from the road channel shall be provided on both sides of the junction and
everything exceeding 0.9 metres in height above the road channel level shall be
removed from the sight line areas.  Thereafter nothing exceeding 0.9 metres in
height shall be planted, placed, or erected within these sight lines to the satisfaction
of the Council as Roads and Planning Authority. 
Reason: In the interests of traffic safety.
30. That before the development hereby approved is completed or brought into use, at
all road junctions within the housing areas a visibility splay of 2.4 metres by 43
metres measured from the road channel shall be provided on both sides of the
79

Page 80

junction and everything exceeding 0.9 metres in height above the road channel level
shall be removed from the sight line areas.  Thereafter nothing exceeding 0.9 metres
in height shall be planted, placed or erected within these sight lines to the
satisfaction of the Council as Roads and Planning Authority. 
Reason: In the interests of traffic safety.
31. That before the development hereby approved is completed or brought into use, at all
driveway accesses a visibility splay of 2.4 metres by 2.4 metres measured from the
heel of the footway shall be provided on both sides of the vehicular access and
everything exceeding 0.6 metres in height shall be removed from the sight line areas. 
Thereafter nothing exceeding 0.6 metres in height shall be planted, placed or erected
within these sight lines to the satisfaction of the Council as Roads and Planning
Authority.
Reason: In the interests of traffic safety.
32. That prior to any works commencing on site an adequate wheel washing facility must
be fully operational and any vehicle transporting excavated material on or off the site
shall be treated by means of the wheel washing provision. This facility shall be
operation at all times during any earth moving operations and a ‘clean zone’ should
be maintained between the end of the wheel wash facility and the public road to the
satisfaction of the Council as Roads and Planning Authority. 
Reason: To ensure the provision of appropriate facilities on site. 
33. That the two structures associated with the crossing of the unnamed watercourse, on
the northern boundary, will both be subject to the full Technical Approval process for
a ‘Category 1’ structure to the satisfaction of the Council as Roads and Planning
Authority. 
Reason: In order to retain effective planning control.
34. That prior to commencement of works on site relating to any topsoil stripping, ground
investigation or earthworks, the applicant shall undertake an invasive weed survey to
identify nuisance weeds such as Horsetail.  The weed survey and a proposed
remediation strategy shall be submitted to and approved in writing by the Council as
Roads and Planning Authority and all works shall be progressed in accordance with
the agreed remediation strategy. 
Reason: That no invasive weeds or nuisance weeds are permitted below or within
influencing distance of the public road as deemed appropriate by the Council.   
80

Page 81

81

Page 82

82

Page 83

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022 
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/21/1812
Residential development (628 units) with associated roads,
landscaping and SUDS (Approval of matters specified in conditions
imposed on consent HM/10/0052; namely Conditions 2, 5, 6, 8, 9, 10,
11, 13, 14, 15, 16, 17, 18, 19, 20 and 22) 
1 Summary application information 
[purpose]
•  Application type:  Approval of matters specified in conditions
•  
Applicant:  Cala Homes and Barratt Homes 
•  Location:  Land to the West of Strathaven Road 
Hamilton 
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) Grant Matters Specified in Conditions - Subject to Conditions (based on the
conditions attached).
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
(2) This development is located within the Hamilton Community Growth Area and will
be covered by the Planning Obligation which was agreed as part of the planning
permission in principle application (HM/10/0052) for the site.  The purpose of the
Planning Obligation is to ensure the submission of an equitable financial
contribution, on an agreed pro-rata basis, in relation to infrastructure and other
costs associated with the Hamilton Community Growth Area, namely Roads
Infrastructure, Education Provision, Community Facilities and Affordable Housing. 
3 Other information
♦ Applicant’s Agent: Andrew Woodrow
♦ Council Area/Ward: 18 Hamilton West and Earnock
♦ Policy Reference(s): Policy 1 - Spatial Strategy
Policy 2 - Climate Change  
8
83

Page 84

Policy 5 - Development Management and
Placemaking
Policy 11 - Housing
Policy 15 - Travel and Transport
Policy DM1 - New Development Design
Policy SDCC4 - Sustainable Transport 
Residential Design Guide 
♦   Representation(s): 
► 16  Objection Letters
► 2  Support Letters
► 1  Comment Letter 
♦   Consultation(s):   
SEPA Flooding 
Roads Flood Risk Management 
Countryside and Greenspace 
Community and Enterprise Resources - Play Provision Community
Contributions 
West of Scotland Archaeology Service 
SPT 
SP Energy Network 
Nature.Scot 
The Coal Authority Planning and Local Authority Liaison 
Housing Planning Consultations 
Roads Development Management Team 
Environmental Services 
Scottish Water 
84

Page 85

Planning Application Report
1 Application Site
1.1 The planning application site is located within the Hamilton Community Growth Area
(HCGA) and consists of former agricultural land.  The site is irregular in shape and
extends to approximately 44 hectares.  The site is undulating and rises from the
south west corner to the north east section of the site. 
1.2 The site is situated adjacent to the south west of Hamilton, in close proximity to
Strathaven Road, and is identified as being part of the Hamilton Community Growth
Area (HCGA) within the adopted South Lanarkshire Local Development Plan 2.  The
site is bounded by land which forms part of the Hamilton Community Growth Area
and to the east by existing residential properties.  To the south of the site is
Strathaven Road and to the west there is further agricultural land. Construction work
has commenced at the Hamilton Community Growth Area although the overall
development is far from being completed. 
2 Proposal(s)
2.1 The applicant seeks approval for the Matters Specified in Conditions (MSC)
application which seeks to address the terms of the conditions attached to the
Planning Permission in Principle application (HM/10/0052) relative to the
development of the Hamilton Community Growth Area (HCGA) and relates solely to
the site identified above.  The proposal seeks consent for 628 residential units, with
associated roads, landscaping and SUDS at land to the west of Strathaven Road,
Hamilton. 
2.2 The proposal relates to the erection of 628 dwellings and includes 49 affordable
units.  The house types include a range of cottage flats, terraces, semi-detached and
detached house types which will provide a mix of three, four and five bedroom
accommodation.  The proposed dwellings are two storeys in height and several of
the dwelling types have integrated garages and some have associated detached
garages.  Each property would benefit from dedicated parking.  The dwellings are
two storeys in height and externally the dwellings are proposed to be finished in a
combination of render, stone walling, glazing panels and concrete roof tiles.  In
addition, some of the dwellings are proposed to have photovoltaic panels integrated
within the roof structure. 
2.3 The development also includes the formation of a crossing over the Cadzow Burn
which will allow Strathaven Road and Meikle Earnock Road to be linked and which is
a key component of the whole HCGA.  There will also be landscaped areas
throughout the development.  In addition, the proposal includes a SUDS area to the
north east of the site.  Along the western boundary of the site a new Greenbelt
boundary will be formed. 
2.4 A number of documents were submitted in support of the application, namely a
Planning Statement, Tree Survey, Noise Assessment, Ground Investigation Report,
Flood Risk Assessment, Transport Statement and a Drainage Strategy Report. 
3 Background
3.1 Local Plan Status
3.1.1 The determining issues in the consideration of this application are its compliance
with the adopted South Lanarkshire Local Development Plan 2 and its impact on
residential amenity, traffic safety and infrastructure issues.  
85

Page 86

3.1.2  The planning application site is designated as being part of a Community Growth
Area for Hamilton and as forming part of the Council’s housing land supply. 
Residential uses are supported within such sites, subject to compliance with normal
development management criteria.  The site is affected by Policy 1 ‘Spatial Strategy,’
Policy 2 ‘Climate Change,’ Policy 5 ‘Development Management and Place Making,’
Policy 11 ‘Housing,’ Policy 15 ‘Travel and Transport,’ Policy DM1 ‘New Development
Design’ and Policy SDCC4 ‘Sustainable Transport’ of the adopted Local
Development Plan. 
3.2 Relevant Government Advice/Policy
3.2.1 In terms of residential development, Scottish Planning Policy requires Councils to
maintain a five year supply of effective housing land.  Planning Authorities are also
required to promote the efficient use of land by, where possible, directing
development towards sites within existing settlements in order to make effective use
of established infrastructure and service capacity. 
3.2.2 Designing Streets ‘A Policy Statement for Scotland’ was introduced in March 2010
and establishes the Scottish Government’s commitment to move away from a
standardised engineering approach to streets and to raise the quality of design in
urban and rural development.  Development layouts should be designed to
encourage a safe environment for pedestrians and cyclists with narrower streets,
carefully positioned dwellings, landscaping and off-street parking which can be more
effective at achieving slower traffic movements.  Permeability which encourages
walking is now seen as a high priority and footpath links are encouraged to ensure
that houses can be easily accessed from main public transport routes. 
3.3 Planning Background
3.3.1 An application for the ‘Development of Community Growth Area, Comprising
Housing, Neighbourhood Centre, Community Facilities, Access Roads, Open Space
and Landscaping (Planning in Principle application: HM/10/0052)’ was granted
consent on 11 May 2017. 
3.3.2 A planning application for ‘Drainage engineering works associated with Hamilton
Community Growth Area development’ (P/22/0941) has been submitted and is being
assessed by the Planning Authority. 
4 Consultation(s)
4.1 Roads Development Management Team - have advised that they have no
objection to the development, subject to the imposition of conditions.  These
conditions relate to phasing (including any crossing over the Cadzow Burn), the
provision of a bus service strategy, access, parking and the submission of a
Construction Traffic Management Plan. 
In addition, they have advised that the delivery of the spine road would enable an
alternative route for drivers travelling towards Strathaven Road.  As such, it would be
proposed to include a condition to request a phasing plan which would seek to
ensure the spine road is connected to Meikle Earnock Road at an early stage in the
construction programme whilst acknowledging the commercial aspects of overall
development.  The applicants have confirmed it would be their intention to deliver the
culvert over the Cadzow Burn at an early stage.  It would also be a condition that
construction traffic for P/21/1811 and P/21/1812 would only be permitted to take
access from Strathaven Road; with the exception of the construction traffic required
to deliver the culvert over the Cadzow Burn which would be taken from Meikle
Earnock Road.  This would reduce the potential volume of construction traffic on
Meikle Earnock Road. 
86

Page 87

Response: Noted.  It is advised that these requirements can be addressed through
the use of planning conditions, where appropriate. 
4.2 Roads Flood Risk Management - no response to date although they have
previously advised that they have no objection in principle to development within the
community growth area subject to appropriate conditions. 
Response: Noted. 
4.3 Environmental Services - had raised concerns in relation to the potential internal
noise levels within some of the dwellings and the proposed noise mitigation at the
site.  They subsequently requested that further information be submitted by the
agent.  Environmental Services has reviewed the updated information and have
advised that it is considered acceptable, subject to the imposition of a condition
relating to noise at the site.  In addition, they have advised that they have no
objection to the development, subject to the imposition of conditions relating to the
submission of a piling method statement, the submission of an air quality impact
assessment and advisory notes relating to dust, nuisance and pest control.
Response: Noted.  It is advised that these requirements can be addressed through
the use of conditions and advisory notes, where appropriate. 
4.4 Countryside and Greenspace – no response to date.
Response: Noted.   
4.5 Community and Enterprise Resources - Play Provision Community
Contributions – this site is subject to a planning obligation which covers the majority
of the HCGA and the level of contributions required has previously been agreed. 
The development will be required to comply with the terms of the existing planning
obligation.
Response: Noted.   
4.6 SPT - no response to date.
Response: Noted. 
4.7 SP Energy Network - have offered no objection to the proposal.
Response: Noted. 
4.8 NatureScot - no response to date.
Response: Noted. 
4.9 The Coal Authority - have offered no objection to the proposal. 
Response: Noted. 
4.10 Housing Planning Consultations - this site is subject to a planning obligation which
covers the majority of the HCGA and the affordable housing provision has previously
been agreed.  The development will be required to comply with the terms of the
existing planning obligation.
Response: Noted. 
4.11  Scottish Water - have offered no objection to the proposal.
Response: Noted. 
4.12 West of Scotland Archaeology Service - have advised that they have no objection
to the proposal, subject to the imposition of a condition relating to the implementation
of a programme of archaeological works at the site.  
87

Page 88

Response: Noted.  It is advised that these requirements can be addressed through
the use of a planning condition, where appropriate. 
4.13 SEPA Flooding – initially requested that a Flood Risk Assessment (FRA) was
submitted in relation to the application.  The agent submitted the requested FRA,
however, following a review of this document they objected to the proposal on the
basis that the proposed development is likely to place buildings and people at flood
risk contrary to Scottish Planning Policy.  The agent provided a response to the
issues raised in the form of a technical memo and SEPA subsequently removed their
objection to the proposal.
Response: Noted. 
5 Representation(s)
5.1 Statutory neighbour notification was undertaken and the proposal was advertised in
the local press.  Following this publicity, 16 letters of representation were received, 2
letters of support and 1 letter of comment.  The grounds of objection can be summarised
as follows:- 
a) Concern that there is yet more housing proposed without appropriate
transport, medical facilities or schools provision.
Response:  The proposed development is designated as part of the Hamilton
Community Growth Area and the provision of new dwellings associated with
transport links, education and other services have been key elements of this
large scale Local Development Plan allocation.  In particular, through the
determination of the previous ‘Planning Permission in Principle’ application
(HM/10/0052), for the overall Hamilton CGA, any impact on existing facilities
was assessed and an appropriate level of developer contributions set which
will be delivered through a legal agreement. 
b) Concern that the proposal will have an adverse impact on the green
space areas and will result in the loss of Greenbelt. 
Response: The site lies within an area designated as a Community Growth
Area within the adopted Local Development Plan and is not Greenbelt land.
The release of this undeveloped land for housing has been fully assessed
during the Local Development Plan process. 
c) The development will result in noise pollution. 
Response:  It is generally accepted that any construction works will result in a
short term disruption and will result in an increase in noise levels in the area. 
Notwithstanding this issue, Environmental Services have been consulted in
relation to the proposal and it is intended to attach appropriately worded
conditions, or informative, to address such concerns.  Furthermore, any
issues in terms of noise can also be pursued, where appropriate, through
Environmental Services. 
d) An existing road had previously collapsed and there is concern over the
increase in traffic in the area. 
Response:  The site forms part of the proposed Hamilton Community Growth
Area which is identified for residential purposes within the adopted Local
Development Plan.  The application site also lies within the previous
application for ‘Planning Permission in Principle’ (HM/10/0052) which aims to
assist in the delivery of the Community Growth Area and was the subject of
extensive assessment.  In terms of the impact on the roads infrastructure, a
number of improvements were identified which will be delivered, at
appropriate times, throughout the delivery of the overall Hamilton CGA
88

Page 89

proposal.  In terms of the current application, it is noted that Roads and
Transportation Services have offered no objections in terms of these
concerns. 
e) Flooding and drainage is an issue at the site and the current drainage
system cannot sustain the proposed amount of houses without
upgrading and replacing the system. 
Response:  A Flood Risk Assessment was submitted and assessed as part
of the planning submission and is considered acceptable.  In addition, a
planning application for ‘Drainage engineering works associated with Hamilton
Community Growth Area development’ (P/22/0941) has been submitted and
is being assessed by the Planning Authority. 
f) Concern regarding the impact on wildlife at the site. 
Response: An Initial Update Survey, prepared by Heritage Environmental
Limited, was part of the supporting documents submitted relating to the
application.  This document reviews the potential impact that the proposal has
in relation to established wildlife at the site and identifies provided avoidance
and mitigation measures. 
g) We feel that community engagement has been non-existent and the
community feel like they should have been able to have their say.
Response: Noted. 
h) It is not clear where the funding relating to these sites has been used. 
Response: Noted. 
i) The builders have not been adhering to the conditions set by South
Lanarkshire Council and the public need clarification that monitoring is
being undertaken.
Response:  The Planning Service review and discharge the appropriate
information relating to planning conditions.  In addition, any issues relating to
the conditions not being correctly adhered to by developers should be directed
to the Councils Planning Enforcement Team. 
j) There is confusion regarding the originally submitted Transport
Assessment from 2009 and the closure of some roads to private
vehicles and we would like to arrange a meeting regarding this matter.
Response: An updated Transport Statement, dated December 2021, has
been submitted in support of the planning application which provides further
details in relation to transport issues associated with this site. 
k) Concern regarding pollution at the site. 
Response: Environmental Services has been consulted in relation to this
matter and they have advised that the agent should submit an air quality impact
assessment for review and it is considered that an appropriate condition relating to
this matter could be attached to any consent granted. 
l) The proposed path networks have been poorly linked to the streets. 
Response: Roads and Transportation Services have been consulted in
relation to the proposed development and they have not raised any issues in
this regard.  
89

Page 90

m) More provision should be made for future expansion to the south.
Response:  This is a matter for the local development plan process. 
n) A wider range of house styles should be incorporated.
Response: It is considered that across the Hamilton Community Growth
Areas a wide range of housing types will be provided. 
5.2 These letters are available for inspection on the planning portal. 
6 Assessment and Conclusions
6.1 The applicant seeks detailed planning consent for residential development (628
units) with associated roads, landscaping and SUDS (relating to consent
HM/10/0052) at land to the west of Strathaven Road, Hamilton. 
6.2 The determining issues in the consideration of this application are its compliance
with national policy, local development plan policy and its impact on residential
amenity, traffic safety, environmental matters and infrastructure issues. 
6.3 With regards to Government guidance and advice, as detailed in section 3.2,
Scottish Planning Policy highlights that where a proposal accords with up-to-date
development plans, it should be considered acceptable in principle.  The site is
identified within the adopted Local Development Plan as being suitable for residential
development through its designation as part of the Community Growth Area for
Hamilton.  The proposed use therefore raises no issues from a land use perspective
and can be considered to accord with national planning policy. 
6.4 In terms of Local Plan policy, the site is affected by Policies 1 and 2 of the adopted
Local Development Plan.  The application site is designated as being a Community
Growth Area for Hamilton under the terms of Policy 1 of the adopted Local
Development Plan.  These policies promote sustainable economic growth and
regeneration, a move towards a low carbon economy, the protection of the natural
and historic environment and mitigation against the impacts of climate change.  The
proposal involves the development of an area of vacant land, at a sustainable
location in Hamilton as part of the Community Growth Area.  Therefore, it is
considered that the proposal raises no issues within the context of Policies 1 and 2 of
the adopted Local Development Plan. 
6.5  In addition, the site is affected by Policy 11 of the adopted Local Development Plan
and forms part of the Council’s housing land supply.  Subsequently, the principle of
the site for residential use accords with the provisions of Policy 11 of the adopted
Local Development Plan. 
6.6 Policy 5 of the adopted Local Development Plan identifies that all development
proposals will require to take account of and be integrated with the local context and
built form.  It is considered that the design, location and scale of the proposed
development is acceptable and will not result in a significant material impact on the
streetscape or any nearby properties.  Therefore, the proposal raises no issues
within the context of Policy 5 of the adopted Local Development Plan. 
6.7 Policy DM1 of the adopted Local Development Plan relates to the design and layout
of all new developments.  Given the physical characteristics of the site, it is
considered that the development will not result in a significant adverse impact on the
nearby properties in terms of privacy, overlooking, overshadowing and the proposed
dwellinghouses are of a similar scale and style to those being developed elsewhere
within the HCGA.  Subsequently, the proposed development accords with the
90

Page 91

provisions of Policy DM1 of the adopted Local Development Plan.  In addition, it is
considered that the proposed layout for the development generally accords with the
standards set out in the Council’s Residential Design Guide. 
6.8 Policy 15 and Policy SDCC4 of the adopted Local Development Plan seek to ensure
that development considers and, where appropriate, mitigates the resulting impacts
of traffic growth and encourages sustainable transport options that take account of
the need to provide proper provision for walking, cycling and public transport.  The
site is accessible and the development would be integrated into transport walking
networks.  Through the provision of a crossing over the Cadzow Burn, the two
portions of the HCGA can be linked and the through road will provide direct vehicular
access between Strathaven Road and Meikle Earnock Road.  Conditions can be
attached to any consent to ensure that the path layout incorporates the existing right
of way and aspiration core path to the north of the site.  In addition, Roads and
Transportation Services consider that the proposal is acceptable in terms of access,
parking and road safety issues.  Subsequently, it is considered that the proposal
accords with the provisions of Policies 15 and SDCC4 of the adopted Local
Development Plan.  Whilst there will be a degree of disruption during construction,
conditions are proposed which include measures such as the provision and
agreement of a Traffic Management Plan.  The purpose is to minimise disruption as
much as possible during the construction phase of the development.  Whilst work
has been ongoing with the Hamilton Community Growth Area for a number of years,
it is important that any disruption is minimised and local ward Councillors and the
relevant Community Council recently met with Council Officers.  It is anticipated that
further meetings will be arranged and monitoring undertaken in order to ensure that
the development is being undertaken in accordance with the agreed details. 
6.9 In conclusion, the proposal relates to the creation of a high quality housing
development on a vacant site and the design, layout and general impact of the
development is considered to be acceptable and the proposals comply with the
relevant policies contained in the adopted Local Development Plan.  In view of the
above, it is recommended that planning consent be granted subject to conditions. 
The development will be subject to the terms of the associated planning obligation
under Section 75 of the Planning Act covering the HCGA, or other appropriate legal
agreement. 
7 Reasons for Decision
7.1 The proposal will not significantly adversely impact on residential or visual amenity,
environmental matters or infrastructure issues.  The proposal raises no issues within
the policy context of 1, 2, 5, 11, 15, DM1 and SDCC4 of the adopted Local
Development Plan 2 and there are no other material considerations which would
justify the refusal of planning permission. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 3 October 2022 
Previous references
 HM/10/0052 – Planning Committee – 28 March 2017 
91

Page 92

List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter, dated 29 October 2021 and 26 January 2022 
► Consultations   
SEPA Flooding 02.03.2022
20.07.2022 
Roads Flood Risk Management  N/A 
Countryside and Greenspace  N/A 
Community and Enterprise Resources - Play Provision
Community Contributions 
N/A 
West of Scotland Archaeology Service  19.11.2021 
SPT  N/A 
SP Energy Network  02.11.2021
Nature.Scot N/A
Housing Planning Consultations N/A
Scottish Water 22.11.2021 
Roads Development Management Team 30.09.2022 
Environmental Services 16.08.2022
The Coal Authority Planning and Local Authority Liaison 13.12.2021 
► Representations           Dated:  
Miss Sarah Lean, 27 Whitecraigs Crescent, Hamilton, ML3
8SN 
25.02.2022 
Mr George Bebbington, 75 Corsehill Crescent, Hamilton, ML3
8FD 
24.02.2022 
Mrs Carla McGuinness, 22 Redwood Crescent, Hamilton,
ML3 8SZ 
24.02.2022 
Mr Arthur Hailstones, 31 Macdairmid Drive, Hamilton, ML3
8AZ 
22.02.2022 
Mrs Carrie Cullen, 12a Russell Street, Hamilton, ML3 0QP  22.02.2022 
Mr Gary Tierney, 46 Nevis Ave, Hamilton, ML3 8UA  22.03.2022 
Mrs Vicki Hailstones, 31, Macdermid Drive, Hamilton, ML3
8AZ 
22.02.2022 
92

Page 93

Mrs Ann Marie Nichol, 6 MacDairmid Drive, Hamilton, ML3
8AZ 
24.02.2022 
Miss SHARON MONTAGUE, 85B MEIKLE EARNOCK
ROAD, HAMILTON, ML38AG 
22.02.2022 
Miss Mackenzie Finlay, 162 Wellhall Road, Hamilton, ML3
9XW 
22.02.2022 
Miss Lesley Auld, 150 West Wellhall Wynd, Hamilton, ML3
9GA 
22.02.2022 
Miss Amy Rowsell, 85, Meikle Earnock Road, Hamilton, ML3
8AG 
27.02.2022 
Mr Darren Russell, 71 Corsehill Crescent, Hamilton, ML3
8FD 
22.02.2022 
Mrs Emma McCallum, Cadzow View, 12 Harrowslaw Drive,
Hamilton, ML3 8SL 
23.02.2022 
Ms Leigh Ann Thompson, 225 Meikle Earnock Road,
Hamilton, ML3 8RZ
28.02.2022 
Mrs Ellison Dunn, 85A MEIKLE EARNOCK ROAD,
HAMILTON, ML3 8AG 
22.02.2022 
Miss Tracy Mullen, 37 Linden Lea, Hamilton, ML3 9AG  22.02.2022 
Mr John McPartlin, 20 Scotia Gardens, Hamilton, ML3 8XA  22.02.2022 
Mrs Karen O'Reilly, 54 Corsehill Crescent, Hamilton, ML3
8FE 
24.02.2022 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Gail Neely, Planning Officer, Floor 6, Council Offices, Almada Street, Hamilton, ML3 0AA
Phone: 07551841002   
Email: gail.neely@southlanarkshire.gov.uk  
93

Page 94

Detailed planning application 
Paper apart – Application number: P/21/1812 
Conditions and reasons 
01. That, unless otherwise agreed with the Council as Planning Authority, the
landscaping and open space schemes shall be completed to the satisfaction of the
Council as Planning Authority during the first available planting season following
occupation of the building(s) or the completion of the development hereby approved,
whichever is the sooner, and shall thereafter be maintained and replaced where
necessary to the satisfaction of the Council.     
Reason: In the interests of amenity. 
02. That prior to works commencing on site a management plan for the maintenance and
management of the structural planting within the site shall be submitted to the
Council as Planning Authority.  Following written approval, the management plan
shall be thereafter implemented to the satisfaction of the Council as Planning
Authority.     
Reason: In order to retain effective planning control. 
03. That prior to the occupation of each dwellinghouse the approved fences and walls
associated with each plot shall be erected and thereafter maintained to the
satisfaction of the Council as Planning Authority.     
Reason: In order to retain effective planning control. 
04. That, unless otherwise agreed in writing and prior to works commencing on site, the
applicant shall submit details to demonstrate each dwelling has access to their own
electric vehicle charging (EVC) point.  Thereafter, the agreed EVC provision shall be
installed, commissioned, and maintained in accordance with the approved plans and
specifications prior to that property which it serves being occupied.       
Reason: To ensure the provision of appropriate facilities on site. 
05. Prior to commencement of the development hereby approved, details of measures to
facilitate the provision of full fibre broadband to serve the development, including
details of appropriate digital infrastructure and a timescale for implementation, shall
be submitted to and approved in writing by the Council as Planning Authority, unless
otherwise agreed in writing with the applicant.  The approved measures shall
thereafter be carried out in accordance with the agreed implementation timescale.     
Reason: To ensure the provision of digital infrastructure to serve the development. 
06. That no dwellinghouse shall be occupied until the site is served by a sewerage
scheme constructed in accordance with Scottish Water standards and as approved
by the Council as Planning Authority in consultation with Scottish Water as
Sewerage Authority.     
Reason: To ensure the provision of a satisfactory sewerage system. 
94

Page 95

07. That, unless otherwise agreed with the Council as Planning Authority, before the
development hereby approved is completed or brought into use, the entire access
road and footpath network, including un-adopted remote footpaths, serving the
development shall be laid out and constructed in accordance with the specification of
the Council as Roads and Planning Authority.     
That no dwellinghouse shall be occupied until the access roads and footpaths
leading thereto from the existing public road have been constructed in accordance
with the specification of the Council as Roads and Planning Authority.  Unless
otherwise agreed with the Council as Planning and Roads Authority, all footpaths
shall be 2.0 metres in width and be of a bound construction.     
Reason: In the interest of public safety. 
08. That prior to the commencement of any works associated with the development, a
Construction Traffic Management Plan shall be submitted to and approved in writing
by the Council as Roads and Planning Authority and implemented thereafter.  This
plan should include details of access and parking provision for staff and visitors,
intended working hours, the management and storage of deliveries and further
information regarding the provision of wheel washing facilities to prevent mud being
carried on to the adopted road.  For the avoidance of doubt, all vehicular access to
and from the development should be via Strathaven Road with the exception of any
such vehicles involved in the construction of the Cadzow Burn crossing, which
should utilise the Muttonhole Road/Meikle Earnock Road route, if necessary.   
Reason: In order to retain effective planning control. 
09. That no development shall commence until details of surface water drainage
arrangements have been submitted to and approved in writing by the Council as
Planning Authority; such drainage arrangements will require to comply with the
principles of sustainable urban drainage systems and with the Council's Sustainable
Drainage Design Criteria and shall include signed appendices as required.  The
development shall not be occupied until the surface drainage works have been
completed in accordance with the details submitted to and approved in writing by the
Council as Planning Authority.       
Reason: To ensure that the disposal of surface water from the site is dealt with in a
safe and sustainable manner, to return it to the natural water cycle with minimal
adverse impact on people and the environment and to alleviate the potential for on-
site and off-site flooding. 
10. That the internal noise levels at any location within the new dwellings with windows
open (or under exceptional circumstances closed) shall not exceed- 
a) An LAeq,16hr of 40dB daytime (07:00-23:00) and an LAeq,8hr of 30dB night-time
(23:00-07:00). 
b) The internal LAmax shall not exceed 45dB night-time (23:00-07:00) 
c) The external levels shall not exceed an LAeq,16hr of 55dB daytime in any rear
garden areas, when measured free-field.   
Reason: In order to retain effective planning control. 
11. That no piling works shall be carried out on the site until a method statement has
been submitted to and approved in writing by the Planning Authority. 
This statement shall include an assessment of the impact of the piling on
surrounding properties, taking into account the guidance contained in BS 6472: 1992
95

Page 96

'Evaluation of human exposure to vibration in buildings.'  It shall detail any
procedures which are proposed to minimise the impact of noise and vibration on the
occupants of surrounding properties.  This statement shall be prepared by a suitably
qualified person, and the piling works shall thereafter be carried out in accordance
with the approved method statement.   
Reason: These details have not been submitted or approved. 
12. That an air quality impact assessment shall be submitted to and approved in writing
by the Council as Planning Authority.  This document shall satisfy the Planning
Authority that the Local Air Quality Management Objectives for the pollutants
specified in the Air Quality Regulations, made under Part IV of the Environment Act
1995, will not be exceeded at any of the proposed dwellings due to the impacts of
the proposed development and, or the potential increase in traffic associated with the
development.  The survey and report should use a method based on the principles
set out in the Environmental Protection UK document Development Control: Planning
for Air Quality (2010 Update) and Scottish Government publication 'Local Air Quality
Management Technical Guidance LAQM.TG(09)' or a method that has been agreed
with the Planning Authority.   
Reason: In order to retain effective planning control.  
13. (a) That remediation of the site shall be carried out in accordance with an approved
remediation plan prior to the proposed development being brought into use.  Any
amendments to the approved remediation plan shall not be implemented unless
approved in writing by the Council as Planning Authority. 
(b) On completion of the remediation works, the developer shall submit a completion
report to the Council as Planning Authority, confirming that the works have been
carried out in accordance with the approved remediation plan and that the works
have successfully reduced these risks to acceptable levels. 
(c) Any previously unsuspected contamination which becomes evident during the
development of the site shall be brought to the attention of the Council as Planning
Authority within one week or earlier of it being identified.  A more detailed site
investigation to determine the extent and nature of the contaminant(s) and a site-
specific risk assessment of any associated pollutant linkages, shall then require to be
submitted to and approved in writing by the Council as Planning Authority.   
Reason: To ensure the appropriate remediation of the site. 
14. That before any development commences on site, a scheme for the control and
mitigation of dust shall be submitted to and approved in writing by the Council as
Planning Authority.  No changes to the approved scheme shall take place unless
agreed in writing by the Council as Planning Authority.  The scheme shall thereafter
be implemented in accordance with a programme to be agreed in writing with the
Council as Planning Authority.   
Reason: These details have not been submitted or approved. 
15. That no development shall take place within the application site as outlined in red on
the approved plan until the developer has secured the implementation of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted by the applicant, agreed by the West of
Scotland Archaeology Service, and approved in writing by the Planning Authority. 
Thereafter the developer shall ensure that the programme of archaeological works is
fully implemented and that all recording and recovery of archaeological resources
96

Page 97

within the development site is undertaken to the satisfaction of the Planning Authority
in agreement with the West of Scotland Archaeology Service.   
Reason: These details have not been submitted or approved. 
16. That no development shall commence until pre-construction protected species
surveys are carried out within the development site and an appropriate surrounding
buffer in accordance with the submitted Initial Update Surveys, prepared by Heritage
Environmental Limited (dated August 2021).  Where protected species are found to
be present and could be impacted by the development, a species protection plan
should be submitted to and approved in writing by the Council as Planning Authority.   
Reason: In order to retain effective planning control.  
17. That all works at the site shall be undertaken in accordance with the findings of the
Tree Survey and Arboriculture Constraints Report, prepared by Alan Motion Tree
Consulting Ltd (dated 28 October 2021), to the satisfaction of the Council as
Planning Authority. 
Reason: To protect established species. 
18. That, unless otherwise agreed with the Council as Planning and Roads Authority,
before the development hereby approved is completed or brought into use, parking
shall be provided to the following standards and thereafter maintained to the
specification of the Council as Roads and Planning Authority. 
Parking Standards
All units up to 3 bedrooms - 2 spaces
All units of 4 or more bedrooms - 3 spaces 
Under National Roads Development Guide, a single garage can be counted towards
a parking space providing the minimum internal dimensions are equal to or greater
than 7.0m x 3.0m. 
All parking bays serving terraced properties should be at right angles to the road and
be 6.0m in length. All parking courtyards shall have a central aisle width of 6.0m with
parking bays of 2.5m x 5.0m. 
Reason: In order to retain effective planning control. 
19. That no development shall commence until details of the phasing of the development
particularly in relation to the crossing across the Cadzow Burn shall be submitted to
and approved in writing by the Council for approval.  Following approval, the
development shall be implemented in accordance with the approved scheme to the
satisfaction of the Council as Planning Authority.
Reason:  In order to ensure a properly programmed development.
20. That a Bus Service Strategy, which shall include the full length of the spine road and
considers the bus stops and future bus stops on Meikle Earnock Road, shall be
submitted to, approved in writing by the Council.  The Bus Service Strategy shall be
fully implemented, prior to the completion of the development.
Reason: These details have not been submitted or approved.  
97

Page 98

21. That unless otherwise agreed in writing with the Planning Authority, all construction
vehicles associated with the development hereby approved shall access the site
from the spine road only. 
Reason: In order to retain effective planning control. 
22. For the avoidance of doubt, there shall be no retaining walls/structures which will
impact on the adoptable roads. 
Reason: In order to retain effective planning control.
23. That all pedestrian and cyclepaths shall be designed to national cycle route
standards to the satisfaction of the Council as Planning and Roads Authority.
Reason: In order to retain effective planning control.
24. That no dwellinghouse shall be occupied until the parking spaces associated with the
dwellinghouse shall be constructed in accordance with the approved plans to the
specification and satisfaction of the Council as Roads and Planning Authority.
Reason: To ensure adequate parking provision on the site. 
25. For the avoidance of doubt, no driveways or off-street parking bays should have a
gradient steeper than 10%. 
Reason: In order to retain effective planning control.
26. That before any dwellinghouse within the development hereby approved is
completed or brought into use, the first two metres (minimum) of the associated
driveway shall be surfaced, trapped, and sealed to prevent any deleterious material
or water from leaving the driveway to the satisfaction of the Council as Roads and
Planning Authority.   
Reason: In the interests of traffic safety and to prevent deleterious material entering
the roads. 
27. That before the development hereby approved is completed or brought into use, at
all road junctions with the spine road, a visibility splay of 4.5 metres by 90 metres
measured from the road channel shall be provided on both sides of the junction and
everything exceeding 0.9 metres in height above the road channel level shall be
removed from the sight line areas.  Thereafter nothing exceeding 0.9 metres in
height shall be planted, placed, or erected within these sight lines to the satisfaction
of the Council as Roads and Planning Authority. 
Reason: In the interests of traffic safety.
28. That before the development hereby approved is completed or brought into use, at
all road junctions within the housing areas a visibility splay of 2.4 metres by 43
metres measured from the road channel shall be provided on both sides of the
junction and everything exceeding 0.9 metres in height above the road channel level
shall be removed from the sight line areas.  Thereafter nothing exceeding 0.9 metres
in height shall be planted, placed or erected within these sight lines to the
satisfaction of the Council as Roads and Planning Authority. 
Reason: In the interests of traffic safety. 
98

Page 99

29. That before the development hereby approved is completed or brought into use, at
all driveway accesses a visibility splay of 2.4 metres by 2.4 metres measured from
the heel of the footway shall be provided on both sides of the vehicular access and
everything exceeding 0.6 metres in height shall be removed from the sight line
areas.  Thereafter nothing exceeding 0.6 metres in height shall be planted, placed or
erected within these sight lines to the satisfaction of the Council as Roads and
Planning Authority.
Reason: In the interests of traffic safety.
30. That prior to any works commencing on site an adequate wheel washing facility must
be fully operational and any vehicle transporting excavated material on or off the site
shall be treated by means of the wheel washing provision.  This facility shall be
operation at all times during any earth moving operations and a ‘clean zone’ should
be maintained between the end of the wheel wash facility and the public road to the
satisfaction of the Council as Roads and Planning Authority. 
Reason: To ensure the provision of appropriate facilities on site. 
31. The structure associated with the Cadzow Burn watercourse crossing will be subject
to the full Technical Approval process for a ‘Category 1’ structure to the satisfaction
of the Council as Roads and Planning Authority.
Reason: In order to retain effective planning control.
32. Further information relating to a review of the pedestrian and cycle linkages to the
black path shall be undertaken and  submitted to the Council as Planning and Roads
Authority.
Reason: To ensure that walking and cycling facilities are maximised for the residents
within the development. 
33. That prior to commencement of works on site relating to any topsoil stripping, ground
investigation or earthworks, the applicant shall undertake an invasive weed survey to
identify nuisance weeds such as Horsetail.  The weed survey and a proposed
remediation strategy shall be submitted to and approved in writing by the Council as
Roads and Planning Authority and all works shall be progressed in accordance with
the agreed remediation strategy. 
Reason: That no invasive weeds or nuisance weeds are permitted below or within
influencing distance of the public road as deemed appropriate by the Council.   
99

Page 100

100

Page 101

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/21/1582
Substitution of flats (approved under CR/16/0138) with dwellings;
amendment to Plot 24 (approved under P/20/1729) to provide 14 no.
semi-detached and terraced dwellings; alteration to cycle track
alignment and proposed culvert of section of existing burn to replace
footbridge (amendment to CR/16/0138 and P/20/1729) 
1 Summary application information
Amended
•  Application type:  Detailed planning application
•  
Applicant:  Dundas Estates & Development Co Ltd 
•  Location:  Land 145M Southwest of 7 Dechmont Cottages
Gilbertfield Road
Cambuslang
South Lanarkshire  
[1purpose]
2 Recommendation
2.1 The Committee is asked to approve the following recommendation: -
[recs]
(1) Grant Detailed Planning Permission – Based on Conditions Listed.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
(2) If planning consent is granted, the decision notice should be withheld until a
Planning Obligation in respect of a financial contribution for the
improvement/upgrading of education provision in the area has been concluded
between the applicant and the Council. 
In accordance with agreed procedure, should there be no significant progress,
on behalf of the applicant, towards the conclusion of the Planning Obligation
within 6 months of the date of the Committee, the proposed development may
be refused on the basis that, without the planning control/developer contribution
which would be secured by the Planning Obligation, the proposed development
would be unacceptable.  
9
101

Page 102

If, however, this matter is being progressed satisfactorily the applicant will be
offered the opportunity to enter into a Processing Agreement, if this is not
already in place.  This will set an alternative agreed timescale for the conclusion
of the Planning Obligation. 
All reasonable legal costs incurred by the Council in association with the above
Obligation shall be borne by the developers. 
3 Other information
♦ Applicant’s Agent: Debbie Reeves
♦ Council Area/Ward: 14 Cambuslang East
♦ Policy Reference(s): Policy 1: Spatial Strategy
Policy 2: Climate Change
SDDC2: Flood Risk
SDDC3: Sustainable Drainage Systems
SDCC4: Sustainable Transport
Policy 3 General Urban Areas
Policy 5 Development Management and
Placemaking
DM1: New Development Design
DM15: Water Supply
DM16: Foul Drainage and Sewerage
Policy 11: Housing Land
Policy 12: Affordable Housing and Housing Choice
Policy 13: Green Network and Greenspace
Policy 14: Natural and Historic Environment
NHE16: Landscape
Policy 15: Travel and Transport
Policy 16: Water Environment and Flooding 
♦   Representation(s): 
► 0  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
♦   Consultation(s):   
Roads and Transportation Services (Development 
Management Team) 
Environmental Services 
Roads Flood Risk Management 
Roads and Transportation Services (Structures) 
Education Resources School Modernisation Team 
Community and Enterprise Resources - Play Provision
Community Contributions 
Housing Services 
Scottish Gas Network 
Health and Safety Executive 
SEPA 
102

Page 103

Planning Application Report
1 Application Site
1.1 The application site is located within the Cambuslang/Rutherglen settlement boundary
and is positioned between Gilbertfield Road and Lightburn Road, towards the
southeast of Cambuslang, south of Hamilton Road A724.  It comprises former
agricultural land, immediately adjacent to a gas pumping station to the southwest.  The
site is gently sloping and measures approximately 0.8ha.  A burn runs in a south
westerly direction to the south of the site and a footpath known as Shepherd’s Lane
runs along the western boundary.  Two gas pipelines run along the southeast of the
burn. 
1.2 The site forms part of a wider residential development site developed by Dundas
Estates.  This application site is known as Phase 2B.  There is an extensive planning
history pertaining to this site as noted further below.  As such, the site currently
comprises a construction site, with the surrounding areas proposed or under
construction for associated phases. Phase 2A is to the northwest, and Phases 2C and
2D to the southeast.  The site overlaps with Phase 2C where the open space is
provided and a cycleway crossing is proposed.  
2 Proposals
2.1 The wider site benefits from permission for a large-scale housing development
comprising 128 dwellinghouses across 4 phases, with Phase 2A under construction. 
The application site subject of this application, known as Phase 2B, benefits from
planning permission under reference CR/16/0138 for a residential development
comprising 9 flats and 4 cottage flats, and is now proposed to include 1 unit from Phase
2A - totalling 14 units.  This application seeks to substitute house types and amend
the layout and infrastructure provision to include footpaths, cycleways and a bridging
culvert, removing a previously proposed footbridge which crosses the existing burn
due to constraints relating to the gas pipeline infrastructure in proximity to the burn and
proposed crossing.  The bridging culvert with cycle path is intended to connect Phases
2A/B with Phases 2C/D and wider cycle networks. 
2.2 The proposed house substitutions would provide for a mix of 14 semi-detached and
terraced units, resulting in a change from flatted units to dwellinghouses.  One
additional unit, Plot 24, is to be incorporated into Phase 2B from Phase 2A and is also
to be substituted in terms of house design.  Plot 24 was recently granted a previous
change under planning reference P/20/1729, meaning that while 14 units are proposed
under this application, as Plot 24 is rearranged to form part of Phase 2B, there are no
changes to the housing numbers within Phases 2A and 2B, only style, size, design
and layout is being considered. 
2.3 Phase 2B is located centrally within the wider development site, west of the SuDS
area, east of the existing gas pumping station and north of the burn and proposed
open space area.  The houses would be formed of two blocks of 4 terraced units (Plots
47-50 and 51-54 respectively) laid out in a row positioned facing east, with 2 semi-
detached units (Plots 55 and 24) completing the row further north.  Parking to serve
the terrace units would be to the front immediately off the access road, with the semi-
detached units benefitting from individual driveways.  Across the internal access road
would be 4 units (Plots 43-46) comprising 2 x 2 semi-detached units in a mirrored L-
shaped layout - these units would be bound to the rear by the new proposed
foot/cycleway, with a connection running into the site between the two blocks and
leading over the culvert to the southeast.  This arrangement sees the re-siting of the
units along the western boundary adjacent to the gas pumping station where parking
was originally proposed, and reconfiguration of the internal road layout.  Trees are to
103

Page 104

be retained to the rear of the western units, Plots 24 and 47-55. Boundary treatments
would comprise a mix of hedging, 1.8m high stone screen walls, low walls with railings,
and timber fencing between houses, and post and wire fencing to open areas.  Tree
planting is proposed within the open space areas.  The housing mix is proposed as
follows:- 
 2x Brodie 2 Storey 3-bed semi-detached
 2x Douglas 2 Storey 3-bed semi-detached
 2x Gilroy 2 Storey 3-bed end terrace
 4x Elliot 2.5 Storey 3-bed mid terrace
 2x Elliot 2.5 Storey 3-bed end terrace
 2x Pentland 2 Storey 3-bed semi-detached 
Finishing materials are to include concrete roof tiles, render walls, upvc windows and
doors, and coloured fascia detailing.  2 Parking spaces are to be provided in-curtilage
for semi-detached units, and 2 spaces are proposed for the terraced units within 2
parking courts to the front. 
2.4 For clarification, the red line site boundary for this proposed application differs from
the smaller red line boundary approved under C/16/0138.  It is enlarged to the south
and southeast slightly to take in the new culvert and includes a cycle path to the
northeast.  Notwithstanding, it is incorporated within the wider red line covered by
planning application P/20/1729 which sought an amendment to Phase 2A.  The
general roads layout, open space, and cycle links remain as approved under
P/20/1729, with only realigned routes and amended house types and siting proposed,
deeming this an amendment application.  The SuDS scheme has been slightly
repositioned within the same location as that previously approved.  Therefore, the main
considerations are the revised housing layouts and design, the new culvert proposal,
and technical matters associated with these amendments. 
2.5 The general layout would remain consistent with the earlier approvals and incorporate
servicing within the adjacent phases, featuring access to be taken from Gilbertfield
Road running northeast then southeast through Phase 2A to serve this phase; open
space is to be provided to the south and a SuDS area to the east.  Footways and cycle
paths are continued to be proposed throughout the development site, with connections
to the reconfigured Phase 2C layout proposed and Lightburn Road to the north; and a
culvert is proposed to be aligned over the burn to the south to replace the earlier bridge
proposal, with the cycle path extending over the new culvert leading to the adjacent
development to the south east.  A new footpath is proposed to connect with Phase 1
on Gilbertfield Road, and a new aligned footway is proposed on the opposite side of
Lightburn Road.  The proposal would connect to the public drainage and water supply
networks. 
3 Background
3.1 Local Plan Status
3.1.1 In terms of local plan policy, the site is located within the Cambuslang/Rutherglen
settlement boundary in the adopted South Lanarkshire Local Development Plan 2
(SLLDP2).  The application site and associated proposal is affected by Policy 1:
Spatial Strategy, Policy 2: Climate Change, Policy 3: General Urban Areas and
Settlements, Policy 5: Development Management and Placemaking, Policy 11:
Housing, Policy 12: Affordable Housing, Policy 13: Green Network and Greenspace,
Policy 14: Natural and Historic Environment, Policy 15: Travel and Transport, and
Policy 16: Water Environment and Flooding as well as associated detailed
development management and sustainable development policies.  The content and
aims of these policies are discussed in section 6 of this report.
104

Page 105

3.2 Relevant Government Advice/Policy
3.2.1 Relevant Government guidance is set out within the consolidated Scottish Planning
Policy (SPP) 2014 which confirms the requirement for the Council to maintain a five-
year supply of effective housing land and also provides policy guidance relating to 
the provision of affordable housing.  Planning authorities are required to promote  the
efficient use of land by directing development towards sites within existing 
settlements where possible to make effective use of existing infrastructure and
services. SPP also introduces a presumption in favour of development that contributes
to sustainable development. 
3.3 Planning Background
3.3.1 There is an extensive planning background to this site and associated phases.  This
application forms part of a suite of applications seeking to update house types and
slightly amend housing numbers to that previously approved.  The relevant reference
numbers and breakdowns are included in the table below:- 
Phase Original Reference and
Housing Numbers
Current Reference and Housing
Numbers
2A CR/15/0046 - 42 units,
granted 7 December 2020. 
P/20/1729 - amendment to
previously approval
including substitution of
house types, alteration of
road alignment, amendment
to SuDS, addition of sub-
station and new foot and
cycle paths, granted 1 April
2021.
P/20/1729 - 41 units,
amendment to CR/15/0046
seeking substitution of house
types, granted 1 April 2021. 
No further changes proposed to
this phase of development. 
2B CR/16/0138 - 13 units
comprising 9 flats and 4
cottage flats, granted 7
December 2020. 
P/20/1729 - 1 unit included
in Phase 2A now as
amended covered by Phase
2B, granted1 April 2021.
P/21/1582 - current pending
application comprising 14 units
(amendment to earlier
approval).
2C CR/17/0039 - 26 units,
granted 7 December 2020.
P/21/1962 - current pending
application comprising 26 units
(amendment to earlier
approval).
2D CR/17/0076 - 47 units,
granted 7 December 2020.
P/21/2031 - current pending
application comprising 53 units
(amendment to earlier
approval). 
3.3.2 The total housing numbers has increased from 128 units across the four sites, to 134
units, with the additional 6 units contained in Phase 2D.  The layout across all sites
has been amended to include a culvert to replace the original proposed footbridge. 
3.3.4 All applications remain extant, establishing the principle of development.  Any works
which have commenced on site form part of these earlier approvals. 
105

Page 106

3.3.5 The previous applications were covered by a S69 upfront payment for contributions
towards affordable housing, education, and community. 
4 Consultations
4.1 Roads and Transportation Services (Development Management Team) 
Response:  raise no objections to the above proposals subject to the inclusion of the
conditions previously added to CR/16/0138 and a separate condition pertaining to the
proposed culvert. 
4.2 Environmental Services
Response:  raise no objections to the proposal subject to conditions relating to noise
impact and acoustic fencing being attached to any permission granted. 
4.3 Roads Flood Risk Management 
Response:  have no objection to the proposed development.  This service notes that
the self-certification in regard to the sustainable drainage system for each phase of
development, will be captured as part of the Roads Construction Consent process
which is underway for each of these developments. 
4.4 Roads and Transportation Services (Structures)
Response: The Structures Team note that the proposals include for the provision of
an adoptable culvert to accommodate an unnamed watercourse.  The proposed
adoptable culvert will be subject to the full Technical Approval process as detailed in
the Design Manual for Roads and Bridges.  South Lanarkshire Council will be the
Approving Authority.  In terms of the Technical Approval process the proposed culvert
is a Category 1 structure.  The process includes for the submission and subsequent
approval by the Approving Authority of an Approval in Principle (AIP) submission.  The
AIP submitted in support of the proposals was accepted and approved on behalf of
the Approval Authority on 12 September 2022. 
4.5 Community and Enterprise Resources - Play Provision Community
Contributions 
Response:  No response has been provided to date. Any contributions will be sought
by way of upfront payment before a decision is issued should permission be granted. 
4.6 Education Resources School Modernisation Team 
Response: This service seeks a per unit contribution for any additional units.  Over
three applications a total of 6 additional units are proposed, resulting in an additional
contribution requirement which will be secured by an upfront payment prior to any
permission granted being issued. 
4.7 Housing Services 
Response:  Has confirmed that there would be no additional affordable housing
provision due to the small increase in numbers across all 3 pending applications. 
4.8  Scottish Gas Networks (SGN) 
Response: Withdraw any objection to the planning application on the condition that
SGN are consulted on all works within 35 metres of its high-pressure gas pipelines
(Major Accident Hazard Pipelines), with the aim of ensuring the pipeline and the
integrity of the servitude or easement area are not compromised. 
4.9 Health and Safety Executive (HSE) 
Response: Comment that based on the information provided for the planning
application, the revised “Does Not Advise Against” recommendation generated is
106

Page 107

appropriate as HSE would not advise against a sensitivity level 2 development in the
middle consultation zone. 
4.10 SEPA
Response:  Confirms that the culvert is minimal and does not constitute realignment
therefore no authorisation is required from SEPA for the works.  The developer is
however reminded of their responsibilities to seek separate permissions out with the
planning remit. 
5 Representations
5.1 Statutory neighbour notification and advertisement was undertaken in respect of this
application and no letters of representation have been received as a result of this
publicity. 
6 Assessment and Conclusions
6.1 Full planning permission is sought for the erection of 14 dwellinghouses, proposed as
substituted house plots on an earlier approval, as well as a revised layout including a
proposed culvert and foot and cycle paths at land 145m southwest of 7 Dechmont
Cottages, Gilbertfield Road, Cambuslang.  The main issues to be addressed in the
determination of this application includes the acceptability in principle of the
development, the layout, siting and design of the proposed scheme, and an
assessment of technical matters.  The policies contained within the South Lanarkshire
Local Development Plan 2 are the main consideration in this case, together with an
assessment of any material planning considerations. 
6.2 In terms of a spatial strategy, Policy 1 of the SLLDP2 directs larger developments to
sustainable urban locations, and together with Policy 11 seeks to ensure that there is
an effective and mixed housing land supply.  Policy 3 states that residential
developments within urban areas and settlements, including Cambuslang/Rutherglen
for which this site is situated within, will generally be acceptable, and Policy 5 sets out
design criteria required to deliver successful places as discussed further below. 
6.3 As outlined above, the site benefits from extant consent under previous applications
for residential development, and this application seeks only a change in layout, siting
and design as well as house type and mix.  Therefore, the principle of development
has been established in line with sustainable development requirements for residential
proposals outlined in the above policies.  Although the earlier consent was granted
under a previous Local Development Plan, the site continues to be allocated for
housing land under the current SLLDP2 within the settlement maps, and therefore the
principle of residential development at this location is acceptable. 
6.4 In terms of housing numbers, permission was granted at this site for 13 units
comprising 9 flatted units laid out in a 3 storey L-shaped block and 4 cottage flat units. 
Under a separate amendment application, a single unit at Plot 24 was substituted, and
this proposal seeks to amend this house type further, incorporating it into Phase 2B. 
This application differs as although maintaining 14 units in total, these would be of
semi-detached and terraced form.  They would be sited at the same general location
but repositioned within the phased area and be of a lower scale and different house
type. 
6.5 Policy 11 states that developers must provide a range of house size and types to meet
local needs and market demands.  It is considered in this case that while the loss of
flats is regrettable as they contributed to a wider mix, consideration has been given to
the type of housing at this site, and on balance the mix remains acceptable.  The
Council’s Housing Service raise no comments in relation to this.
107

Page 108

6.6 In terms of affordable housing, as the numbers are the same as previously approved,
and below 20 units for this particular phase, there will be no requirement for additional
contributions required in this instance in compliance with Policy 12.  As noted above,
across the three pending applications a total of 6 additional units are proposed. The
Council’s Affordable Housing Service has confirmed that no additional contributions
are required in this regard due to the small increase in numbers.  Overall, the effective
land supply, the substituted house types, layout and housing mix is considered to be
in accordance with Policy 1, 3, 5 and 11 of the South Lanarkshire LDP 2.  This is one
phase of a wider development and is considered to fit successfully in the wider scheme
both in terms of placemaking and housing supply. 
6.7 Turning to layout, siting and design, together Policies 3, 5 and DM1 set out criteria
which must be met to ensure that the proposal contributes, in a positive manner, to
the quality of the surrounding built and natural environment, its character and
appearance.  This includes that the development is appropriate in its siting, layout and
density, and responds to this in terms of design and scale.  Patterns of development
and surrounding amenity should be respected.  In particular, Policy DM1 seeks to
promote quality and sustainability and ensure that all new developments meet the six
qualities of a successful place, including being distinctive whilst respecting the local
identity and creating a sense of place; being safe and pleasant; welcoming; adaptable;
efficient and well connected. 
6.8 Overall, the development in this phase is relatively small scale, and can be adequately
accommodated within the site area and level changes.  The proposed rearrangement
would see the semi-detached and terraced units follow a similar pattern of
development as earlier phases, extending the linear pattern southwards along the
western edge, with active frontages facing onto internal roads and a buffer around the
pumping station offering screening and amenity.  As outlined in the supporting Design
Statement prepared by the developer, the house types are sought to respond to
market conditions offering a suitable mix of houses which are visually appealing.  The
size and massing are considered acceptable as the rows are broken down into smaller
blocks, so as not to be over dominant or visually obtrusive.  The L-shaped blocks
adjacent offer a distinctive layout, which would be appropriately less dense towards
the SuDs and open space areas.  The whole proposed phase offers a gateway to the
proposed culvert, cycle crossing and open space, adequately serviced by parking and
suitable access - contributing to connectivity and responding to the natural
environment of the site.  The finishing materials provide a mix which breaks up the
front elevations of the proposed properties together with projections and dormer
windows which further reduces the massing and offers visual interest.  Hard and soft
landscaping also creates a welcoming, safe and pleasant appearance and responds
to the site context in terms of existing trees, topography and providing a buffer around
the gas pipelines and watercourse.  Overall, the proposal is considered to be
appropriately designed and scaled in accordance with the aforementioned policies. 
6.9 The house types and layout have been considered to avoid any negative amenity
impacts, with suitable fencing providing privacy to rear gardens, and adequate
separation to avoid direct overlooking, and no significant rear projections to avoid
overshadowing.  There is considerable distance from existing surrounding properties
to mitigate against any negative effects arising from this development.  While an
inevitable degree of change will result in the landscape setting from this development,
it is not considered to be overly obtrusive and offers sufficient open space to lessen
any impact, ensuring that the landscape character is not significantly adversely
affected in accordance with Policy NHE16.  Conditions will be attached to any
permission granted seeking full landscaping details including retained and proposed
planting.  This should support biodiversity enhancements also.  In summary, the
108

Page 109

proposal is acceptable in terms of layout, siting and design, with no significant negative
impact on surrounding amenity, generally satisfying the criteria set out in DM1. 
6.10 In terms of technical matters, a new culvert is proposed to replace a footbridge which
formed part of the earlier approved applications.  The developer has advised this is
sought for reasons to avoid impact on the gas pipeline infrastructure. SGN have
responded with no objection to the proposals in proximity of the pipelines and following
consultation, HSE does not advise against the granting of permission.  Together
Roads Development, Flooding and Structures have reviewed the proposal and are
satisfied that the culvert can be suitably installed with no significant impact on
servicing, flooding or access and connectivity in accordance with SDDC2, subject to
technical design.  Policy 16 sets out that engineering works which have an
unacceptable impact will not be supported.  The culvert proposal has undergone
significant review with consultees confirming no objections following submission of
detailed design proposals, agreements in principle and will form part of the conditions
of any permission granted.  Correspondence from SEPA confirms that the culvert is
minimal and does not constitute realignment therefore no authorisation is required
from SEPA for the works.  In regard to the water environment, as the proposal would
connect to the public water supply and drainage network it is considered acceptable
in line with DM15 and DM16, with conditions attached where relevant.  SDCC3
supports SuDS developments which are integral to the overall design.  In this case,
the SuDS scheme follows that previously approved in terms of its location within the
site, albeit it is slightly repositioned.  It connects to the open space, offering appropriate
landscaping and a softer edge to the development, so as not to negatively affect the
setting of the area. 
6.11 Together the SuDS arrangement and open space area provides ample and useable
open space within the development site in addition to private amenity garden ground. 
This creates recreational opportunities and promotes walking and cycling in
accordance with policies listed above and contributes to sustainability and the visual
quality of the site.  The siting of the open space also allows for appropriate separation
between Dechmont Cottages further northeast.  Together with proposed landscape
buffers, the open space layout and distribution is in compliance with SLLDP2 policies. 
6.12 The site is designated as a green network. Policy 13 seeks to protect existing
resources from loss or fragmentation due to development, but also recognises there
are opportunities to extend and enhance the network and provide new links, which is
the case in this proposal as new footways and cycle routes are proposed, together
with the open space provision and buffer zone around the pipelines and watercourse. 
This allows for blue-green networks and contributes towards successful placemaking
in the overall development scheme.  Open space is proposed to the south and this
would not result in a negative effect on the biodiversity of the site, with no protected
species or significant additional loss of trees.  Connectivity through active travel
methods is proposed and therefore overall, the principle of development within the
green network is accepted as per Policy 1 criteria 10 and Policy 13 as the green
network is enhanced through new proposed connections, amenity and landscaping
proposals as part of this established allocated housing development site. 
6.13 Through such new proposed connections active travel is promoted in line with Policy
15 as existing routes are safeguarded and enhanced.  In terms of access, this would
remain to be obtained from Gilbertfield Road.  Internal road layouts are suitable, with
adequate provision for parking.  Footway and cycleway connections have been
realigned to fit with the proposed culvert and this is considered to offer adequate
connectivity and promote active travel, leading to a successful, well-connected place. 
Footpaths out with the site boundary will be subject of further details to be submitted
109

Page 110

as part of conditions and will result in improved accessibility and connectivity
throughout and surrounding the site.  With regard to road safety, Policy 15 requires all
new development proposals to consider the resulting impacts of traffic growth.  The
site has been fully assessed by Roads and Transportation Services who have offered
no objections, subject to conditions being reattached from the previous approval, and
in relation to the culvert design.  The proposal can therefore be considered acceptable
in transportation terms.
.
6.14 Overall, in line with the aims of Policy 2, the development is sustainably located as an
allocated housing site with acceptable SuDS provision, avoids flood risk and promotes
active travel, supports the green network and provides EV charging all contributing to
sustainable development to reduce climate change in line with SDCC2, SDCC3 and
SDCC4. 
6.15 In conclusion, the site benefits from extant planning permission for an established
housing site, meaning that many considerations are carried forward from these earlier
approvals.  The main issues of the reconfigured layout and housing types are deemed
acceptable as a suitable mix is provided and is appropriately designed.  The site can
adequately accommodate the revised layout, with ample open space and it can be
suitably accessed and serviced.  The proposal has been subject to detailed
consultation, in particular to the culvert proposal, and all technical matters have been
addressed, and there are no material planning reasons which would warrant a refusal
in this instance.  Additional educational contributions will be sought, and no further
contributions are required in this particular phase of development, as the uplift in units
is small scale.  Therefore, the proposal complies with all relevant policies contained
within the South Lanarkshire Local Development Plan 2, and the application is
recommended for approval, subject to conditions.  For the avoidance of doubt, relevant
conditions from the previous consent will be re-attached to any permission granted. 
7 Reasons for Decision
7.1 The development would continue to deliver the allocated housing site and offer an
updated housing mix.  The proposal is appropriately designed and would have no
adverse impacts on the surrounding landscape or character and amenity of the area. 
All technical matters have been addressed, and the proposal satisfies all relevant
policies contained within the South Lanarkshire Local Development Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 30 September 2022 
Previous references
 CR/15/0046
 CR/16/0138
 CR/17/0039
 CR/17/0076
 P/20/1729 
List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter dated 8 September 2021  
110

Page 111

► Consultations
Roads and Transportation Services (Development
Management Team)  
24.08.2022
Environmental Services 12.10.2021
Roads Flood Risk Management 09.09.2022
Roads and Transportation Services (Structures) 
Education Resources School Modernisation Team 
Housing Services 
Scottish Gas Network 
Health and Safety Executive 
SEPA 
Community and Enterprise Resources - Play Provision
Community Contributions 
13.09.2022 
19.07.2022 
12.09.2022 
02.09.2022 
14.09.2022 
27.08.2021     
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Jane Weir, Planning Officer, Montrose House, 154 Montrose Crescent, Hamilton, ML3 6LB
Phone: 07795 455 502   
Email: jane.weir@southlanarkshire.gov.uk  
111

Page 112

Detailed planning application 
Paper apart – Application number: P/21/1582 
Conditions and reasons 
1. No dwellinghouse hereby approved shall be occupied unless a Residential Travel Plan
has been submitted to and approved in writing by the planning authority in consultation
with the Roads Service.  The Travel Plan shall encourage more sustainable means of
travel and shall include mode share targets.  No dwellinghouse shall be occupied
unless the measures set out in its approved Travel Plan have been issued to all
homeowners. 
Reason: In the interests of sustainable travel. 
2. No works in connection with the development hereby approved shall commence
unless details of the refuse bin uplift store area[s] have been submitted to and
approved in writing by the planning authority.  The area[s] shall be constructed behind
any visibility splay and shall be designed so as to be accessible for refuse bin uplift
and to prevent empty bins from being wind-blown.  No dwellinghouse shall be
occupied unless the refuse bin uplift store area[s] have been provided and surfaced in
accordance with the approved details.  Once provided, the refuse bin uplift store
area[s] shall thereafter be permanently retained as such. 
Reason: To ensure the provision of an appropriate means of servicing in the interests
of road safety. 
3. Notwithstanding the development hereby approved, no construction activities
connected with the culvert and associated earthworks shall commence until full details
of the culvert design has been submitted and approved by South Lanarkshire Council
as Roads Authority and the Planning Service.  The detailed design shall include
ground investigation specific to the structure and also a full earthworks Specification
all complying with the Design Manual for Roads and Bridges and the Manual of
Contract Documents for Highway Works. 
The design and layout of all new infrastructure and improvements shall be in
accordance with the Design Manual for Roads and Bridges and SCOTS design
guidance unless otherwise agreed by the Council as Planning and Roads Authority. 
Reason: In the interests of public safety. 
4. Prior to the commencement of development, a full Safety Audit, in accordance with
the Institute of Highways and Transportation Guidelines, shall be submitted for the
written approval of the Planning Service in consultation with the Roads Service for
approval for all infrastructure to be constructed and adopted, or altered, on the public
road. 
Reason: In the interests of public safety. 
5. No dwellinghouse hereby approved shall be occupied unless its driveway, parking and
turning area has been provided and fully paved in accordance with details to be
submitted to and approved in writing by the Planning Authority.  The maximum
gradient of each driveway shall not exceed 10% gradient and each driveway shall be
internally drained and formed in such a way to prevent any flow of surface water either
onto or from the public road.  The first 2m of a driveway, behind the heel of the footway
112

Page 113

shall be hard surfaced.  All driveways shall be designed with car parking for each
vehicle to a minimum of 3m x 6m, with provision to meet Council car parking standards. 
Once provided, all parking and turning areas shall thereafter be permanently retained
as such. 
Reason: To ensure the timely completion of each driveway to an adequate standard
to prevent the carriage of loose driveway material on to the public road in the interests
of road safety. 
6. For the avoidance of doubt, the first 12.5m of any road within the site shall not exceed
a gradient of 2% and no driveway or access will be permitted within 15m of the junction
off Gilbertfield Road.  The junction improvement at Gilbertfield Road/Flemington Road
(by the implementation of the 3metre wide footway/cycleway) shall have minimum radii
of 10.5 metres. 
Reason: In the interests of traffic and pedestrian safety 
7. Prior to commencement of development, a Traffic Management Plan (TMP), including
details of the traffic routes of construction vehicles, site compound, show where all
vehicles and deliveries will be located, on-site parking and wheel washing facilities
shall be submitted for the written approval of the Planning Service in consultation with
the Roads Service.  The TMP should restrict all site work (incl. vehicle movements)
from operating within the school opening and closing times, unless otherwise agreed. 
No work shall commence until the TMP has been approved in writing by the Council
as Planning Authority. Thereafter, the works shall be carried out in full accordance with
the agreed details. 
Reason: In the interests of road and public safety. 
8. Prior to the commencement of development, and notwithstanding Conditions 9-14
inclusive, a drawing showing the internal footways, cycleways and additional
footway/cycleway connections, together with appropriate drainage installation shall be
submitted for the written approval of the Planning Service in consultation with the
Roads Service.  Thereafter, the path shall be implemented in full accordance with the
agreed details prior to the occupancy of the first approved dwellinghouses.  Once
provided, the cycleway and footway shall thereafter be permanently retained as such. 
For the avoidance of doubt, internal footways should be 2m wide. 
Reason: To ensure safe access for pedestrians to the existing footpath network and
the satisfactory provision of a cycle route. 
9. Prior to the commencement of development, full details of a surfaced
cycleway/footway connection between Hamilton Road and the internal development
site roads shall be submitted for the written approval of the Planning Service in
consultation with the Roads Service.  Thereafter, the path shall be implemented in full
accordance with the agreed details prior to the occupancy of the first approved
dwellinghouses.  Once provided, the cycleway and footway shall thereafter be
permanently retained as such. 
The cycle path also acts as a maintenance route for vehicles to access the substation
and should therefore be a minimum of 3.7m in width and constructed to the same
standard as standard carriageway. 
Reason: To ensure safe access for pedestrians to the existing footpath network and
the satisfactory provision of a cycle route. 
113

Page 114

10. Prior to the commencement of development, full details of a footway along Gilbertfield
Road to connect to phase 2 shall be submitted for the written approval of the Planning
Service in consultation with the Roads Service.  For the avoidance of doubt, the
footway shall be 2m wide and surfaced to adoptable standards.  Thereafter, the path
shall be implemented in full accordance with the agreed details prior to the occupancy
of the first approved dwellinghouses.  Once provided, the footway shall thereafter be
permanently retained as such. 
Reason: Reason: In the interests of pedestrian safety and to extend the local
footway/cycle route network. 
11. Prior to the occupancy of the first dwellinghouse hereby approved, a 3m wide
footway/cycleway from Flemington Road into the site, with a 2m wide footway
connecting to the existing footway on Gilbertfield Road (approximately 20m east of
Claudius Crescent) shall be constructed.  Works to include design and provision of a
positive drainage system including a new drain through the Phase 2 development shall
be submitted for the written approval of the Planning Service in consultation with the
Roads Service prior to commencement of development.  Thereafter, the path shall be
implemented in full accordance with the agreed details prior to the occupancy of the
first approved dwellinghouses.  Once provided, the footway shall thereafter be
permanently retained as such. 
Reason: In the interests of pedestrian safety, to extend the local footway/cycle route
network and to alleviate the potential for on-site and off-site flooding. 
12. Prior to commencement of development, full details of the formation of the site access
road and extension of the footway link along Gilbertfield Road shall be submitted for
the written approval of the Planning Service in consultation with the Roads Service. 
Thereafter, the works shall be implemented in full accordance with the agreed details
prior to the occupancy of the first approved dwellinghouses.  Once provided, the works
shall thereafter be permanently retained as such. 
Reason: In the interests of pedestrian safety, to extend the local footway/cycle route
network and in the interests of road safety. 
13. Notwithstanding the development hereby approved prior to commencement of
development full details of a footway link along Lightburn Road shall be submitted for
the written approval of the Planning Service in consultation with the Roads Service. 
For the avoidance of doubt, unless otherwise agreed, the footway shall be a 2m wide
lit footway link constructed on Lightburn Road to connect with the existing footway on
Lightburn Road, at the western boundary of the site.  Thereafter, footway shall be
implemented in full accordance with the agreed details prior to the occupancy of the
first approved dwellinghouses.  Once provided, the works shall thereafter be
permanently retained as such. 
Reason: In the interests of sustainable travel, pedestrian and road public safety. 
14. Notwithstanding the requirements of Condition 13 above, an appropriate footway
network that will connect the new development with the existing footway on Lightburn
Road and Hamilton Road, to enable the retention of the mature hedgerow, shall be
implemented.  Full details of the footway design shall be submitted for the written
approval of the Planning Service in consultation with the Roads Service. Thereafter,
the footway shall be implemented in full accordance with the agreed details prior to
the occupancy of the first approved dwellinghouses.  Once provided, the works shall
thereafter be permanently retained as such. 
114

Page 115

Reason: In the interests of sustainable travel, pedestrian and road public safety. 
15. Notwithstanding the terms of Conditions 8-13 inclusive, a positive drainage system
shall be required to be installed along these sections of carriageway on which the
footways are constructed.  Prior to the commencement of development full drainage
details shall be submitted for the written approval of the Planning Service in
consultation with the Roads Service.  Thereafter, the footway shall be implemented in
full accordance with the agreed details prior to the occupancy of the first approved
dwellinghouses.  Once provided, the works shall thereafter be permanently retained
as such. 
Reason: To encourage natural drainage and to avoid the potential for localised
flooding. 
16. For the avoidance of doubt, prior to the occupation of any dwelling house hereby
approved, the developer shall fund the upgrading of the street lighting along the
frontage of Gilbertfield Road and shall construct a continuous 2m wide footway link on
the previously reserved strip of land along the same Gilbertfield Road frontage of the
site from the existing Phase 1 development to the Phase 2 access road, all to the
satisfaction of the Council as Planning Authority. 
Reason: In the interest of public safety. 
17.  The proposed development shall be connected to the public water supply as indicated
in the submitted application and shall not be connected to a private water supply
without the separate express grant of planning permission by the planning authority. 
Reason: To ensure the long-term sustainability of the development and the safety and
welfare of the occupants and visitors to the site. 
18. Wastewater from the proposed development shall be disposed of via the public sewer
as indicated in the submitted application and shall not be disposed of via private means
without the separate express grant of planning permission by the planning authority. 
No works in connection with the development hereby approved shall commence
unless written confirmation from Scottish Water stating that the site can be
satisfactorily served by a sewerage scheme designed in accordance with Scottish
Water's standards has been submitted to and approved in writing by the Planning
Authority. 
Reason: To ensure the long-term sustainability of the development and the safety and
welfare of the occupants and visitors to the site. 
19. No works in connection with the development hereby approved shall commence
unless full details of the surface water drainage arrangements (including provision of
an updated flood risk assessment, drainage assessment and maintenance
responsibilities) have been submitted to and approved in writing by the Council as
Planning Authority.  Such drainage arrangements will require to comply with the
principles of sustainable urban drainage systems and with the Council's Sustainable
Drainage Design Criteria and requirements (Updated Appendices 1,2,3,4 & 5).  A
drawing showing the proposed SuDS scheme must be provided and the proposed
SuDS scheme shall be located out with the 1 in 200 year plus 30% culvert blockage
level of 58.10m AOD, in agreement and to the satisfaction of the Council as Planning
Authority in discussion with SEPA.  Thereafter, the surface water drainage
arrangements shall be implemented in full accordance with the agreed details and the
development shall not be occupied until the surface drainage works have been
115

Page 116

completed in accordance with the agreed details.  Once provided, the works shall
thereafter be permanently retained as such. 
Reason: To ensure that the disposal of surface water from the site is dealt with in a
safe and sustainable manner, to return it to the natural water cycle with minimal
adverse impact on people and the environment and to alleviate the potential for on-
site and off-site flooding, and to ensure the provision of a satisfactory SUDS pond and
to minimise any flood risk. 
20. Prior to the commencement of development, full details of a contemporary
trash/security screen at the culvert inlet on Hamilton Road shall be submitted for the
written approval of the Planning Service.  For the avoidance of doubt, this shall include
details of an inspection and maintenance regime in respect of the Hamilton Road
culvert and screen.  Thereafter, the works shall be implemented in full accordance with
the agreed details prior to the occupancy of the first approved dwellinghouses.  Once
provided, the works shall thereafter be permanently retained as such, and the culvert
and screen shall be inspected and maintained in accordance with the approved
management schedule to the satisfaction of the Council as Planning Authority. 
Reason: To minimise any flood risk in the area. 
21. Notwithstanding the development hereby approved, prior to the development being
brought into use, the approved scheme for the mitigation of noise shown in the
approved Noise Impact Assessment shall be implemented in full, and where
appropriate, shall be maintained in accordance with the approved scheme to the
satisfaction of the Council as Planning Authority. 
Reason: In the interests of protecting the residential amenities of the new
development. 
22. Notwithstanding the details hereby approved, acoustic fencing will be required to the
satisfaction of Environmental Services.  Prior to the commencement of development,
full details shall be submitted for the written approval by the Planning Service.  For the
avoidance of doubt the fencing shall ensure that between the house of 0800 and 200
the measured noise level emitted from the Engineering works (LAeq 1hour) shall not
exceed the pre-existing background noise level (LA90 (15 mins) by more than 4dB (A)
when measured in accordance with BS4142:2014 at buildings where people are likely
to be affected.  Between the houses of 2000 and 0800 the noise emitted from the
premises (LAeq (15 mins)) shall not exceed the pre-existing background noise level
(LA90 (15 mins) by more than 4dB (A) when measured in accordance with
BS4142:2014 at buildings where people are likely to be affected. 
Reason: In the interests of protecting the residential amenities of the new
development. 
23. No works in connection with the development hereby approved shall commence
unless a scheme of hard and soft landscaping works has been submitted to and
approved in writing by the planning authority. Details of the scheme shall include: 
a) A tree survey in accordance with BS 5837:2012. 
b) Existing landscape features and vegetation to be retained. 
c) Protection measures for the landscape features to be retained. 
d) Existing and proposed finished levels. 
e) The location of new trees, shrubs, hedges, grassed areas and water features,
including enhanced planting for the hedgerow.
116

Page 117

f) A schedule of planting to comprise species, plant sizes and proposed numbers and
density. 
g) Details of any top-soiling or other treatment to the ground.
h) Sections and other necessary details of any mounding, earthworks and hard
landscaping.
i) The location, design and materials of all hard landscaping works including walls,
fences, gates, street furniture and play equipment. 
j) An indication of existing trees, shrubs and hedges to be removed. 
k) A programme for the implementation, completion and subsequent management of
the proposed landscaping, including any phasing. 
All soft and hard landscaping proposals shall be carried out in accordance with the
approved planting scheme and management programme shall be completed to the
satisfaction of the Council as Planning Authority during the first available planting
season following occupation of the buildings or completion of the development hereby
approved, whichever is the sooner.  Any planting which, within a period of 5 years from
the completion of the development, in the opinion of the planning authority is dying,
being severely damaged or becoming seriously diseased, shall be replaced by plants
of similar size and species to those originally required to be planted. 
Once provided, all hard landscaping works shall thereafter be permanently retained. 
Reason: To ensure the implementation and management of a satisfactory scheme of
landscaping which will help to integrate the proposed development into the local 
24.  Prior to the commencement of development, full details of the design and location of
all boundary treatments, including walls, fences and any retaining walls, enclosures,
screening and paving and hard surfacing materials to be erected or installed on the
site shall be submitted for the written approval of the Planning Service.  Thereafter,
the boundary treatments shall be erected in full accordance with the agreed details
prior to the occupancy of the first approved dwellinghouses.  Once provided, all
landscaping works shall thereafter be permanently retained. 
Reason: In the interests of visual amenity. 
25. That notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (or any such order revoking or re-
enacting that order), no gates, fences, walls or other means of enclosure shall be
erected between the front of the dwellinghouse and the adjoining road. 
Reason: In order to retain effective planning control in the interests of the visual
amenities of the area, to protect open space. 
26. That no development shall take place within the development site as outlined in red
on the approved plan until the developer has secured the implementation of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted by the applicant, agreed by the West of
Scotland Archaeology Service, and approved by the Planning Authority.  Thereafter
the developer shall ensure that the programme of archaeological works is fully
implemented and that all recording and recovery of archaeological resources within
the development site is undertaken to the satisfaction of the Planning Authority in
agreement with the West of Scotland Archaeology Service. 
Reason: To safeguard and allow any archaeological remains which may exist on the
site to be satisfactorily recorded. 
117

Page 118

27.  For the avoidance of doubt, no work or crossings of the high-pressure gas apparatus
shall be carried out on site unless detailed consultation has taken place with Scottish
Gas Networks. SGN must be consulted on all works within 35 metres of the high-
pressure gas pipelines (Major Accident Hazard Pipelines), with the aim of ensuring the
pipeline and the integrity of the servitude or easement area are not compromised. 
Thereafter, works shall be carried out in accordance with the agreed position of
Scottish Gas Networks in consultation with the Planning Authority. 
Reason: In the interests of public safety. 
28. For the avoidance of doubt, no mechanical excavations shall take place above or
within 0.5m of the low-pressure gas system, within 0.5m of the medium pressure gas
system or within 3m of the intermediate pressure gas system, and that confirmation of
the position of the gas mains shall be undertaken by using hand dug trial holes. 
Reason: In the interests of public safety. 
29. Prior to development commencing on site, a scheme for the control and mitigation of
dust shall be submitted to and approved in writing by the Council as Planning Authority.
No changes to the approved scheme shall take place unless agreed in writing by the
Council as Planning Authority.  The scheme shall thereafter be implemented in
accordance with a programme to be agreed in writing with the Council as Planning
Authority. 
Reason: In the interests of amenity. 
118

Page 119

119

Page 120

120

Page 121

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/21/1962
Substitution of house types, amendment to SUDS proposals, addition
of sub-station, addition of gas governor and alteration of cycle path
alignment (Amendment to CR/17/0039) 
1 Summary application information
Amended
•  Application type:  Further application
•  
Applicant:  Dundas Estates & Development Co Ltd 
•  Location:  Land 180M Northwest of Dalton School Lodge
Gilbertfield Road
Cambuslang
South Lanarkshire  
[1purpose]
2 Recommendation
2.1 The Committee is asked to approve the following recommendation:-
[recs]
(1) Grant Detailed Planning Permission– Based on Conditions Listed.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
(2) If planning consent is granted, the decision notice should be withheld until a
Planning Obligation in respect of a financial contribution for the
improvement/upgrading of education provision in the area has been concluded
between the applicant and the Council. 
In accordance with agreed procedure, should there be no significant progress,
on behalf of the applicant, towards the conclusion of the Planning Obligation
within 6 months of the date of the Committee, the proposed development may
be refused on the basis that, without the planning control/developer contribution
which would be secured by the Planning Obligation, the proposed development
would be unacceptable.  
10
121

Page 122

If, however, this matter is being progressed satisfactorily the applicant will be
offered the opportunity to enter into a Processing Agreement, if this is not
already in place.  This will set an alternative agreed timescale for the conclusion
of the Planning Obligation. 
All reasonable legal costs incurred by the Council in association with the above
Obligation shall be borne by the developers. 
3 Other information
♦ Applicant’s Agent: Debbie Reeves
♦ Council Area/Ward: 14 Cambuslang East
♦ Policy Reference(s): Policy 1: Spatial Strategy
Policy 2: Climate Change
SDDC2: Flood Risk
SDDC3: Sustainable Drainage Systems
SDCC4: Sustainable Transport
Policy 3 General Urban Areas
Policy 5 Development Management and
Placemaking
DM1: New Development Design
DM15: Water Supply
DM16: Foul Drainage and Sewerage
Policy 11: Housing Land
Policy 12: Affordable Housing and Housing Choice
Policy 13: Green Network and Greenspace
Policy 14: Natural and Historic Environment
NHE16: Landscape
Policy 15: Travel and Transport
Policy 16: Water Environment and Flooding 
♦   Representation(s): 
► 0  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
♦   Consultation(s):   
Roads and Transportation Services (Development
Management Team) 
Environmental Services 
Roads Flood Risk Management 
Roads and Transportation Services (Structures) 
Community and Enterprise Resources - Play Provision
Community Contributions 
Education Resources School Modernisation Team 
Housing Services 
Scottish Gas Networks (SGN) 
Health and Safety Executive (HSE) 
West of Scotland Archaeology Service (WOSAS) 
SEPA 
122

Page 123

Planning Application Report
1 Application Site
1.1 The application site is located within the Cambuslang/Rutherglen settlement boundary
and is positioned between Gilbertfield Road and Lightburn Road, towards the
southeast of Cambuslang, south of Hamilton Road A724, and west of Flemington
Road to the east.  It comprises former agricultural land and is south and east of a gas
pumping station.  The site is gently sloping and measures approximately 2.8ha in total,
with the proposed housing development area for this phase some 1.3ha.  A burn runs
along the northwest through the site, south of the SuDS area.  Two gas pipelines run
though the site adjacent to the burn.  Dalton School Lodge lies approximately 180m
southeast of the site. 
1.2 The site forms part of a wider residential development site developed by Dundas
Estates.  This site is known as Phase 2C.  There is an extensive planning history
pertaining to this site as noted further below.  As such, the site currently comprises a
construction site, with the surrounding areas proposed or under construction for
associated phases. Phases 2A and 2B are located to the northwest, and Phase 2D to
the southeast.  The site overlaps with Phase 2B where the open space and SuDS
scheme is provided and cycleway crossing is proposed. 
2 Proposal(s)
2.1 The wider site benefits from permission for a large-scale housing development
comprising 128 dwellinghouses across 4 phases, with Phase 2A under construction. 
The application site subject of this application, known as Phase 2C, benefits from
planning permission under reference CR/17/0039 for a residential development
comprising 26 dwellinghouses.  This application seeks to substitute house types and
amend the layout and infrastructure provision to include footpaths, cycleways and a
bridging culvert, removing a previously proposed footbridge which crosses the existing
burn due to constraints relating to the gas pipeline infrastructure in proximity to the
burn and proposed crossing.  The bridging culvert with cycle path is intended to
connect Phases 2A/B with Phases 2C/D and wider cycle networks.  The proposal also
seeks an amendment to the SuDS proposals, and the addition of a sub-station and
gas governor. 
2.2 Phase 2C is located on the southern side of the burn and is south of the SuDS area
and gas pumping station.  26 Units are proposed within this phase, south of the open
space area and pipeline buffer zone.  Access would be obtained from the southwest
end of Gilbertfield Road, approximately 210m south of the Phase 2A entrance.  Plots
56, 57, 133, and 134 will front onto the internal access road at the entrance junction,
before a square-shaped shared space area leads north and then runs south west to
serve Plots 58-61 and east to serve Plots 62-70 laid out in a linear pattern running
parallel to the burn on a north-east/south-west axis, before returning south to serve
Plots 71-74 situated perpendicular to the linear row facing south west, at the east of
the Phase.  Plots 106, 107, 108, 115 and 116 form a group at the other side of the
proposed shared space entrance where the road connects into Phase 2D further
south. 
2.3 Generally the houses are in the same position, only slightly altered within the plots.
The house type mix is to include the following detached properties:- 
 1x Harper- 3-bed
 1x Carnegie- 3-bed
 1x Dewar- 3-bed
 2x Stuart- 3-bed
123

Page 124

 1x Matheson- 4-bed
 1x Middleton- 4-bed
 2x Wallace- 4-bed
 3x Kendrick- 4-bed
 2x Lewis- 4-bed
 5x Gillespie- 4-bed
 3x McArthur- 5-bed
 4x Maitland- 5-bed 
All units are to be detached, 2-storey, with some featuring integral or detached
garages.  Finishing materials are to include concrete roof tiles, render walls, upvc
windows and doors, and coloured fascia detailing.  Parking spaces are to be provided
in-curtilage for each proposed unit.  Boundary treatments would comprise a mix of
hedging, 1.8m high stone screen walls, low walls with railings, and timber fencing
between houses, and post and wire fencing to open areas.  The only change sees a
pair of semi-detached units at the site entrance form detached units reconfigured
within the original layout. 
2.4 The proposed cycle/footpath link would run along the edge of the proposed internal
access road, generally running east to west.  This would connect Gilbertfield Road in
the southwest to Hamilton Road in the northeast, and it would also head north through
the site over the proposed culvert crossing into Phase 2B, and further northeast
towards Hamilton Road.  There is a bus stop on Hamilton Road. 
2.5 For clarification, the red line site boundary for this proposed application matches the
red line boundary approved under C/17/0039.  It now contains the proposed new
culvert and gas station and includes the realigned cycle path.  The general roads
layout, open space, and cycle links remain as approved under CR/17/0039, with only
realigned routes and amended house types and siting proposed, deeming this an
amendment application.  The SuDS scheme has been slightly repositioned within the
same location as that previously approved.  Therefore, the main considerations are
the revised housing layouts and design, the new culvert proposal, and technical
matters associated with these amendments. 
2.6 The general layout would remain consistent with the earlier approvals and incorporate
servicing within the adjacent phases.  As mentioned, open space is to be provided to
the north and a SuDS area to the northeast.  Footways and cycle paths are continued
to be proposed throughout the development site, with connections to the reconfigured
Phase 2B layout proposed; and a culvert is proposed to be aligned over the burn to
replace the earlier bridge proposal, with the cycle path extending over the new culvert
leading to the adjacent development to the north.  A new footpath is proposed to
connect with Phase 1 on Gilbertfield Road.  The proposal would connect to the public
drainage and water supply networks.  The SuDS scheme is to be slightly repositioned,
but at the same site.  A new sub-station and gas infrastructure is proposed at the
northern corner of this site, adjacent to where the cycle path connects to Lightburn
Road, in Phase 2B. Landscaping is proposed around these structures, and planting is
proposed throughout the SuDS area and open space area, as well as along the north
running access road, with feature planting around the shared space area at the
entrance. 
3 Background
3.1 Local Plan Status
3.1.1 In terms of local plan policy, the site is located within the Cambuslang/Rutherglen
settlement boundary in the adopted South Lanarkshire Local Development Plan 2
(SLLDP2).  The application site and associated proposal is affected by Policy 1:
124

Page 125

Spatial Strategy, Policy 2: Climate Change, Policy 3: General Urban Areas and
Settlements, Policy 5: Development Management and Placemaking, Policy 11:
Housing, Policy 12: Affordable Housing, Policy 13: Green Network and Greenspace,
Policy 14: Natural and Historic Environment, Policy 15: Travel and Transport, and
Policy 16: Water Environment and Flooding as well as associated detailed
development management and sustainable development policies. The content and
aims of these policies is discussed in section 6 of this report. 
3.2 Relevant Government Advice/Policy
3.2.1 Relevant Government guidance is set out within the consolidated Scottish Planning
Policy (SPP) 2014 which confirms the requirement for the Council to maintain a five-
year supply of effective housing land and also provides policy guidance relating to 
the provision of affordable housing.  Planning authorities are required to promote  the
efficient use of land by directing development towards sites within existing 
settlements where possible to make effective use of existing infrastructure and
services.  SPP also introduces a presumption in favour of development that contributes
to sustainable development. 
3.3 Planning Background
3.3.1 There is an extensive planning background to this site and associated phases.  This
application forms part of a suite of applications seeking to update house types and
slightly amend housing numbers to that previously approved.  The relevant reference
numbers and breakdowns are included in the table below:- 
Phase Original Reference and
Housing Numbers
Current Reference and Housing
Numbers
2A CR/15/0046 - 42 units,
granted 7 December 2020. 
P/20/1729 - amendment to
previous approval including
substitution of house types,
alteration of road alignment,
amendment to SuDS,
addition of sub-station and
new foot and cycle paths,
granted 1 April 2021.
P/20/1729 - 41 units,
amendment to CR/15/0046
seeking substitution of house
types, granted 1 April 2021. 
No further changes proposed to
this phase of development. 
2B CR/16/0138 - 13 units
comprising 9 flats and 4
cottage flats, granted 7
December 2020. 
P/20/1729 - 1 unit included
in Phase 2A now as
amended covered by Phase
2B, granted1 April 2021.
P/21/1582 - current pending
application comprising 14 units
(amendment to earlier
approval).
2C CR/17/0039 - 26 units,
granted 7 December 2020.
P/21/1962 - current pending
application comprising 26 units
(amendment to earlier
approval).
2D CR/17/0076 - 47 units,
granted 7 December 2020.
P/21/2031 - current pending
application comprising 53 units
(amendment to earlier
approval).  
125

Page 126

3.3.2 The total housing numbers have increased from 128 units across the four sites, to 134
units, with the additional 6 units contained in Phase 2D.  The layout across all sites
has been amended to include a culvert to replace the original proposed footbridge. 
3.3.3 All applications remain extant, establishing the principle of development.  Any works
which have commenced on site form part of these earlier approvals. 
3.3.4 The previous applications were covered by a S69 upfront payment for contributions
towards affordable housing, education, and community. 
4 Consultations
4.1 Roads and Transportation Services (Development Management Team) 
Response:  raise no objections to the above proposals subject to the inclusion of the
conditions previously added to CR/17/0039 and a separate condition pertaining to the
proposed culvert. 
4.2 Environmental Services
Response: raise no objections to the proposal subject to conditions relating to noise,
waste control, and dust mitigation being attached to any permission granted.  In terms
of noise, one requested condition relates to internal noise levels with windows open
and construction noise. 
4.3  Roads Flood Risk Management 
Response:  have no objection to the proposed development.  This service notes that
the self-certification in regard to the sustainable drainage system for each phase of
development, will be captured as part of the Roads Construction Consent process
which is underway for each of these developments. 
4.4 Roads and Transportation Services (Structures)
Response: The Structures Team note that the proposals include for the provision of
an adoptable culvert to accommodate an unnamed watercourse.  The proposed
adoptable culvert will be subject to the full Technical Approval process as detailed in
the Design Manual for Roads and Bridges.  South Lanarkshire Council will be the
Approving Authority.  In terms of the Technical Approval process, the proposed culvert
is a Category 1 structure.  The process includes for the submission and subsequent
approval by the Approving Authority of an Approval in Principle (AIP) submission.  The
AIP submitted in support of the proposals was accepted and approved on behalf of
the Approval Authority on 12 September 2022. 
4.5 Community and Enterprise Resources - Play Provision Community
Contributions 
Response:  No response has been provided to date.  Any contributions will be sought
by way of upfront payment before a decision is issued should permission be granted. 
4.6 Education Resources School Modernisation Team
Response:  This service seeks a per unit contribution for any additional units.  Over
three applications a total of 6 additional units are proposed, resulting in an additional
contribution requirement which will be secured by an upfront payment prior to any
permission granted being issued. 
4.7 Housing Services 
Response:  Has confirmed that there would be no additional affordable housing
provision due to the small increase in numbers across all 3 pending applications.  
126

Page 127

4.8  Scottish Gas Networks (SGN) 
Response: Withdraw any objection to the planning application on the condition that
SGN is consulted on all works within 35 metres of its high-pressure gas pipelines
(Major Accident Hazard Pipelines), with the aim of ensuring the pipeline and the
integrity of the servitude or easement area are not compromised. 
4.9 Health and Safety Executive (HSE) 
Response: Comment that based on the information provided for the planning
application, the revised “Does Not Advise Against” recommendation generated is
appropriate as HSE would not advise against a sensitivity level 2 development in the
middle consultation zone. 
4.10 West of Scotland Archaeology Service (WOSAS)
Response:  Note the proximity of archaeological features and request a condition
seeking the implementation of a programme of archaeological works and written
scheme of investigation be attached to any permission granted.  This would allow the
Council to ensure that the correct level of mitigation fieldwork is undertaken and
reported on. 
4.11 SEPA
Response:  Note that they raised no objection to the original application CR/17/0039,
and therefore did not require a formal consultation in this case as the application seeks
only an amendment. 
5 Representation(s)
5.1 Statutory neighbour notification and advertisement was undertaken in respect of this
application and no letters of representation have been received as a result of this
publicity. 
6 Assessment and Conclusions
6.1 Full planning permission is sought for the erection of 26 dwellinghouses, proposed as
substituted house plots on an earlier approval, as well as a revised layout including a
proposed culvert and foot and cycle paths and gas station at land 180m northwest of
Dalton School Lodge, Gilbertfield Road, Cambuslang.  The main issues to be
addressed in the determination of this application include the acceptability in principle
of the development, the layout, siting and design of the proposed scheme, and an
assessment of technical matters.  The policies contained within the South Lanarkshire
Local Development Plan 2 are the main consideration in this case, together with an
assessment of any material planning considerations. 
6.2 In terms of a spatial strategy, Policy 1 of the SLLDP2 directs larger developments to
sustainable urban locations, and together with Policy 11 seeks to ensure that there is
an effective and mixed housing land supply.  Policy 3 states that residential
developments within urban areas and settlements, including Cambuslang/Rutherglen
for which this site is situated within, will generally be acceptable, and Policy 5 sets out
design criteria required to deliver successful places as discussed further below. 
6.3 As outlined above, the site benefits from extant consent under previous applications
for residential development, and this application seeks only a change in layout, siting
and design as well as house type and mix.  Therefore, the principle of development
has been established in line with sustainable development requirements for residential
proposals outlined in the above policies.  Although the earlier consent was granted
under a previous Local Development Plan, the site continues to be allocated for
housing land under the current SLLDP2 within the settlement maps, and therefore the
principle of residential development at this location is acceptable. 
127

Page 128

6.4 In terms of housing numbers, permission was granted at this site for 26 units
comprising 24 detached units and 2 semi-detached units laid out in the same
arrangement.  This application differs slightly as the 2 semi-detached units are
proposed as detached units. 
6.5 Policy 11 states that developers must provide a range of house size and types to meet
local needs and market demands.  It is considered that this minor change is acceptable
and the Council’s Housing service raised no comments in relation to this. 
6.6 In terms of affordable housing, as the numbers are the same as previously approved,
there will be no requirement for additional contributions required in this instance in
compliance with Policy 12.  As noted above, across the three pending applications a
total of 6 additional units are proposed.  The Council’s Affordable Housing Service has
confirmed that no additional contributions are required in this regard due to the small
increase in numbers.  Overall, the effective land supply, the substituted house types,
layout and housing mix is considered to be in accordance with Policy 1, 3, 5 and 11 of
the South Lanarkshire LDP2.  This is one phase of a wider development and is
considered to fit successfully in the wider scheme both in terms of placemaking and
housing supply. 
6.7 Turning to layout, siting and design, together Policies 3, 5 and DM1 set out criteria
which must be met to ensure that the proposal contributes, in a positive manner, to
the quality of the surrounding built and natural environment, its character and
appearance.  This includes that the development is appropriate in its siting, layout and
density, and responds to this in terms of design and scale.  Patterns of development
and surrounding amenity should be respected.  In particular, Policy DM1 seeks to
promote quality and sustainability and ensure that all new developments meet the six
qualities of a successful place, including being distinctive whilst respecting the local
identity and creating a sense of place; being safe and pleasant; welcoming; adaptable;
efficient and well connected. 
6.8 Overall, the development in this phase follows the same pattern as previously
approved, with only minor realignments to path networks and SuDS schemes, and the
inclusion of a substation and gas governor.  The changes can be adequately
accommodated within the site area and level changes.  The proposed layout would
continue to allow for a predominantly linear pattern of development, with houses
fronting along the main access road, and formed around the entrance.  The plots
located along the internal road would benefit from views northwards over the open
space which provides both natural surveillance and an appealing sense of place.  In
terms of house type designs, there is a varied mix responding to market demands. 
The properties are all detached, finished in appropriate materials with sufficient parking
provision.  Hard and soft landscaping also creates a welcoming, safe and pleasant
appearance and responds to the site context in terms of existing trees, topography
and providing a buffer around the gas pipelines and watercourse.  Overall, the
proposal is considered to be appropriately designed and scaled in accordance with
the aforementioned policies. 
6.9 The house types and layout have been considered to avoid any negative amenity
impacts, with suitable fencing providing privacy to rear gardens, and adequate
separation to avoid direct overlooking, and no significant rear projections to avoid
overshadowing.  There is considerable distance from existing surrounding properties
to mitigate against any negative effects arising from this development.  While an
inevitable degree of change will result in the landscape setting from this development,
it is not considered to be overly obtrusive and offers sufficient open space to lessen
any impact, ensuring that the landscape character is not significantly adversely
128

Page 129

affected in accordance with Policy NHE16.  Conditions will be attached to any
permission granted seeking full landscaping details including retained and proposed
planting.  This should support biodiversity enhancements also.  In summary, the
proposal is acceptable in terms of layout, siting and design, with no significant negative
impact on surrounding amenity, generally satisfying the criteria set out in DM1. 
6.10 In terms of technical matters, a new culvert is proposed to replace a footbridge which
formed part of the earlier approved applications.  The developer has advised this is
sought for reasons to avoid impact on the gas pipeline infrastructure.  SGN have
responded with no objection to the proposals in proximity of the pipelines and following
consultation, HSE does not advise against the granting of permission.  Together
Roads Development, Flooding and Structures have reviewed the proposal and are
satisfied that the culvert can be suitably installed with no significant impact on
servicing, flooding or access and connectivity in accordance with SDDC2, subject to
technical design.  Policy 16 sets out that engineering works which have an
unacceptable impact will not be supported.  The culvert proposal has undergone
significant review with consultees confirming no objections following submission of
detailed design proposals, agreements in principle and will form part of the conditions
of any permission granted.  The substations are small scale and do not affect the
general placemaking of the site.  Correspondence from SEPA confirms that the culvert
is minimal and does not constitute realignment therefore no authorisation is required
from SEPA for the works, and they have confirmed they did not require to be consulted. 
In regard to the water environment, as the proposal would connect to the public water
supply and drainage network it is considered acceptable in line with DM15 and DM16,
with conditions attached where relevant.  SDCC3 supports SuDS developments which
are integral to the overall design.  In this case, the SuDS scheme follows that
previously approved in terms of its location within the site, albeit it is slightly
repositioned.  It connects to the open space, offering appropriate landscaping and a
softer edge to the development, so as not to negatively affect the setting of the area. 
6.11 Together the SuDS arrangement and open space area provides ample and useable
open space within the development site in addition to private amenity garden ground. 
This creates recreational opportunities and promotes walking and cycling in
accordance with policies listed above and contributes to sustainability and the visual
quality of the site.  The siting of the open space also allows for appropriate separation
between Dechmont Cottages further northeast.  Together with proposed landscape
buffers, the open space layout and distribution is in compliance with LDP policies. 
6.12 The site is designated as a green network.  Policy 13 seeks to protect existing
resources from loss or fragmentation due to development, but also recognises there
are opportunities to extend and enhance the network and provide new links, which is
the case in this proposal as new footways and cycle routes are proposed, together
with the open space provision and buffer zone around the pipelines and watercourse. 
This allows for blue-green networks and contributes towards successful placemaking
in the overall development scheme.  Open space is proposed to the south and this
would not result in a negative effect on the biodiversity of the site, with no protected
species or significant additional loss of trees.  Connectivity through active travel
methods is proposed and therefore overall, the principle of development within the
green network is accepted as per Policy 1 criteria 10 and Policy 13 as the green
network is enhanced through new proposed connections, amenity and landscaping
proposals as part of this established allocated housing development site.  An invasive
species report was submitted with the application and concluded that no invasive
species were found on the site as reported on. 
129

Page 130

6.13 Through such new proposed connections active travel is promoted in line with Policy
15 as existing routes are safeguarded and enhanced.  In terms of access, this would
remain to be obtained from Gilbertfield Road.  Internal road layouts are suitable, with
adequate provision for parking.  Footway and cycleway connections have been
realigned to fit with the proposed culvert and this is considered to offer adequate
connectivity and promote active travel, leading to a successful, well-connected place. 
Footpaths out with the site boundary will be subject of further details to be submitted
as part of conditions and will result in improved accessibility and connectivity
throughout and surrounding the site.  With regard to road safety, Policy 15 requires all
new development proposals to consider the resulting impacts of traffic growth.  The
site has been fully assessed by Roads and Transportation Services who have offered
no objections, subject to conditions being reattached from the previous approval, and
in relation to the culvert design.  The proposal can therefore be considered acceptable
in transportation terms. 
6.14 Overall, in line with the aims of Policy 2, the development is sustainably located as an
allocated housing site with acceptable SuDS provision, avoids flood risk and promotes
active travel, supports the green network and provides EV charging all contributing to
sustainable development to reduce climate change in line with SDCC2, SDCC3 and
SDCC4. 
6.15 In conclusion, the site benefits from extant planning permission for an established
housing site, meaning that many considerations are carried forward from these earlier
approvals.  The main issues of the reconfigured layout and housing types are deemed
acceptable as a suitable mix is provided and is appropriately designed.  The site can
adequately accommodate the revised layout, with ample open space and it can be
suitably accessed and serviced.  The proposal has been subject to detailed
consultation, in particular to the culvert proposal, and all technical matters have been
addressed, and there are no material planning reasons which would warrant a refusal
in this instance.  Additional educational contributions will be sought, and no further
contributions are required in this particular phase of development, as the uplift in units
is small scale.  Therefore, the proposal complies with all relevant policies contained
within the South Lanarkshire Local Development Plan 2, and the application is
recommended for approval, subject to conditions.  For the avoidance of doubt, relevant
conditions from the previous consent will be re-attached to any permission granted. 
7 Reasons for Decision
7.1 The development would continue to deliver the allocated housing site and offer an
updated housing mix.  The proposal is appropriately designed and would have no
adverse impacts on the surrounding landscape or character and amenity of the area.
All technical matters have been addressed, and the proposal satisfies all relevant
policies contained within the South Lanarkshire Local Development Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 30 September 2022 
Previous references
 CR/15/0046
 CR/16/0138
 CR/17/0039
 CR/17/0076
 P/20/1729 
130

Page 131

List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter dated 17 November 2021 
► Consultations  
Roads and Transportation Services (Development
Management Team) 
24.08.2022
Environmental Services 29.03.2022
Roads Flood Risk Management 09.09.2022
Education Resources School Modernisation Team 
Housing Services 
Scottish Gas Network 
Health and Safety Executive  
19.07.2022 
12.09.2022 
02.09.2022 
14.09.2022
Roads and Transportation Services (Structures) 
WOSAS 
SEPA
13.09.2022 
25.11.2021 
17.11.2021 
Community and Enterprise Resources - Play Provision
Community Contributions 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact: - 
Jane Weir, Planning Officer, Montrose House, 154 Montrose Crescent, Hamilton, ML3 6LB
Phone: 07795 455 502   
Email: jane.weir@southlanarkshire.gov.uk  
131

Page 132

Detailed planning application 
Paper apart – Application number: P/21/1962 
Conditions and reasons 
1. No dwellinghouse hereby approved shall be occupied unless a Residential Travel Plan
has been submitted to and approved in writing by the planning authority in consultation
with the Roads Service.  The Travel Plan shall encourage more sustainable means of
travel and shall include mode share targets.  No dwellinghouse shall be occupied
unless the measures set out in its approved Travel Plan have been issued to all
homeowners. 
Reason: In the interests of sustainable travel. 
2. No works in connection with the development hereby approved shall commence
unless details of the refuse bin uplift store area[s] have been submitted to and
approved in writing by the planning authority.  The area[s] shall be constructed behind
any visibility splay and shall be designed so as to be accessible for refuse bin uplift
and to prevent empty bins from being wind-blown.  No dwellinghouse shall be
occupied unless the refuse bin uplift store area[s] have been provided and surfaced in
accordance with the approved details.  Once provided, the refuse bin uplift store
area[s] shall thereafter be permanently retained as such. 
Reason: To ensure the provision of an appropriate means of servicing in the interests
of road safety. 
3. Notwithstanding the development hereby approved, no construction activities
connected with the culvert and associated earthworks shall commence until full details
of the culvert design has been submitted and approved by South Lanarkshire Council
as Roads Authority and the Planning Service.  The detailed design shall include
ground investigation specific to the structure and also a full earthworks Specification
all complying with the Design Manual for Roads and Bridges and the Manual of
Contract Documents for Highway Works. 
The design and layout of all new infrastructure and improvements shall be in
accordance with the Design Manual for Roads and Bridges and SCOTS design
guidance unless otherwise agreed by the Council as Planning and Roads Authority. 
Reason: In the interests of public safety. 
4. Prior to the commencement of development, a full Safety Audit, in accordance with
the Institute of Highways and Transportation Guidelines, shall be submitted for the
written approval of the Planning Service in consultation with the Roads Service for
approval for all infrastructure to be constructed and adopted, or altered, on the public
road. 
Reason: In the interests of public safety. 
5. No dwellinghouse hereby approved shall be occupied unless its driveway, parking and
turning area has been provided and fully paved in accordance with details to be
submitted to and approved in writing by the Planning Authority.  The maximum
gradient of each driveway shall not exceed 10% gradient and each driveway shall be
internally drained and formed in such a way to prevent any flow of surface water either
132

Page 133

onto or from the public road.  The first 2m of a driveway, behind the heel of the footway
shall be hard surfaced.  All driveways shall be designed with car parking for each
vehicle to a minimum of 3m x 6m, with provision to meet Council car parking standards. 
Once provided, all parking and turning areas shall thereafter be permanently retained
as such. 
Reason: To ensure the timely completion of each driveway to an adequate standard
to prevent the carriage of loose driveway material on to the public road in the interests
of road safety. 
6. For the avoidance of doubt, the first 12.5m of any road within the site shall not exceed
a gradient of 2% and no driveway or access will be permitted within 15m of the junction
off Gilbertfield Road.  The junction improvement at Gilbertfield Road/Flemington Road
(by the implementation of the 3metre wide footway/cycleway) shall have minimum radii
of 10.5 metres. 
Reason: In the interests of traffic and pedestrian safety 
7. Prior to commencement of development, a Traffic Management Plan (TMP), including
details of the traffic routes of construction vehicles, site compound, show where all
vehicles and deliveries will be located, on-site parking and wheel washing facilities
shall be submitted for the written approval of the Planning Service in consultation with
the Roads Service.  The TMP should restrict all site work (incl. vehicle movements)
from operating within the school opening and closing times, unless otherwise agreed. 
No work shall commence until the TMP has been approved in writing by the Council
as Planning Authority.  Thereafter, the works shall be carried out in full accordance
with the agreed details. 
Reason: In the interests of road and public safety. 
8. Prior to the commencement of development, and notwithstanding Conditions 9-14
inclusive, a drawing showing the internal footways, cycleways and additional
footway/cycleway connections, together with appropriate drainage installation shall be
submitted for the written approval of the Planning Service in consultation with the
Roads Service.  Thereafter, the path shall be implemented in full accordance with the
agreed details prior to the occupancy of the first approved dwellinghouses.  Once
provided, the cycleway and footway shall thereafter be permanently retained as such.
For the avoidance of doubt, internal footways should be 2m wide. 
Reason: To ensure safe access for pedestrians to the existing footpath network and
the satisfactory provision of a cycle route. 
9. Prior to the commencement of development, full details of a surfaced
cycleway/footway connection between Hamilton Road and the internal development
site roads shall be submitted for the written approval of the Planning Service in
consultation with the Roads Service.  Thereafter, the path shall be implemented in full
accordance with the agreed details prior to the occupancy of the first approved
dwellinghouses.  Once provided, the cycleway and footway shall thereafter be
permanently retained as such. 
The cycle path also acts as a maintenance route for vehicles to access the substation
and should therefore be a minimum of 3.7m in width and constructed to the same
standard as standard carriageway. 
133

Page 134

Reason: To ensure safe access for pedestrians to the existing footpath network and
the satisfactory provision of a cycle route. 
10. Prior to the commencement of development, full details of a footway along Gilbertfield
Road to connect to phase 2 shall be submitted for the written approval of the Planning
Service in consultation with the Roads Service.  For the avoidance of doubt, the
footway shall be 2m wide and surfaced to adoptable standards.  Thereafter, the path
shall be implemented in full accordance with the agreed details prior to the occupancy
of the first approved dwellinghouses.  Once provided, the footway shall thereafter be
permanently retained as such. 
Reason: Reason: In the interests of pedestrian safety and to extend the local
footway/cycle route network. 
11. Prior to the occupancy of the first dwellinghouse hereby approved, a 3m wide
footway/cycleway from Flemington Road into the site, with a 2m wide footway
connecting to the existing footway on Gilbertfield Road (approximately 20m east of
Claudius Crescent) shall be constructed.  Works to include design and provision of a
positive drainage system including a new drain through the Phase 2 development shall
be submitted for the written approval of the Planning Service in consultation with the
Roads Service prior to commencement of development.  Thereafter, the path shall be
implemented in full accordance with the agreed details prior to the occupancy of the
first approved dwellinghouses.  Once provided, the footway shall thereafter be
permanently retained as such. 
Reason: In the interests of pedestrian safety, to extend the local footway/cycle route
network and to alleviate the potential for on-site and off-site flooding. 
12. Prior to commencement of development, full details of the formation of the site access
road and extension of the footway link along Gilbertfield Road shall be submitted for
the written approval of the Planning Service in consultation with the Roads Service. 
Thereafter, the works shall be implemented in full accordance with the agreed details
prior to the occupancy of the first approved dwellinghouses.  Once provided, the works
shall thereafter be permanently retained as such. 
Reason: In the interests of pedestrian safety, to extend the local footway/cycle route
network and in the interests of road safety. 
13. Notwithstanding the development hereby approved prior to commencement of
development full details of a footway link along Lightburn Road shall be submitted for
the written approval of the Planning Service in consultation with the Roads Service. 
For the avoidance of doubt, unless otherwise agreed, the footway shall be a 2m wide
lit footway link constructed on Lightburn Road to connect with the existing footway on
Lightburn Road, at the western boundary of the site.  Thereafter, footway shall be
implemented in full accordance with the agreed details prior to the occupancy of the
first approved dwellinghouses.  Once provided, the works shall thereafter be
permanently retained as such. 
Reason: In the interests of sustainable travel, pedestrian and road public safety. 
14. Notwithstanding the requirements of Condition 13 above, an appropriate footway
network that will connect the new development with the existing footway on Lightburn
Road and Hamilton Road, to enable the retention of the mature hedgerow, shall be
implemented.  Full details of the footway design shall be submitted for the written
approval of the Planning Service in consultation with the Roads Service.  Thereafter,
134

Page 135

the footway shall be implemented in full accordance with the agreed details prior to
the occupancy of the first approved dwellinghouses.  Once provided, the works shall
thereafter be permanently retained as such. 
Reason: In the interests of sustainable travel, pedestrian and road public safety. 
15. Notwithstanding the terms of Conditions 8-13 inclusive, a positive drainage system
shall be required to be installed along these sections of carriageway on which the
footways are constructed.  Prior to the commencement of development full drainage
details shall be submitted for the written approval of the Planning Service in
consultation with the Roads Service.  Thereafter, the footway shall be implemented in
full accordance with the agreed details prior to the occupancy of the first approved
dwellinghouses.  Once provided, the works shall thereafter be permanently retained
as such. 
Reason: To encourage natural drainage and to avoid the potential for localised
flooding. 
16. For the avoidance of doubt, prior to the occupation of any dwelling house hereby
approved, the developer shall fund the upgrading of the street lighting along the
frontage of Gilbertfield Road and shall construct a continuous 2m wide footway link on
the previously reserved strip of land along the same Gilbertfield Road frontage of the
site from the existing Phase 1 development to the Phase 2 access road, all to the
satisfaction of the Council as Planning Authority. 
Reason: In the interest of public safety. 
17.  The proposed development shall be connected to the public water supply as indicated
in the submitted application and shall not be connected to a private water supply
without the separate express grant of planning permission by the planning authority. 
Reason: To ensure the long-term sustainability of the development and the safety and
welfare of the occupants and visitors to the site. 
18. Wastewater from the proposed development shall be disposed of via the public sewer
as indicated in the submitted application and shall not be disposed of via private means
without the separate express grant of planning permission by the planning authority. 
No works in connection with the development hereby approved shall commence
unless written confirmation from Scottish Water stating that the site can be
satisfactorily served by a sewerage scheme designed in accordance with Scottish
Water's standards has been submitted to and approved in writing by the Planning
Authority. 
Reason: To ensure the long-term sustainability of the development and the safety and
welfare of the occupants and visitors to the site. 
19. No works in connection with the development hereby approved shall commence
unless full details of the surface water drainage arrangements (including provision of
an updated flood risk assessment, drainage assessment and maintenance
responsibilities) have been submitted to and approved in writing by the Council as
Planning Authority.  Such drainage arrangements will require to comply with the
principles of sustainable urban drainage systems and with the Council's Sustainable
Drainage Design Criteria and requirements (Updated Appendices 1,2,3,4 & 5).  A
drawing showing the proposed SuDS scheme must be provided and the proposed
SuDS scheme shall be located out with the 1 in 200 year plus 30% culvert blockage
135

Page 136

level of 58.10m AOD, in agreement and to the satisfaction of the Council as Planning
Authority in discussion with SEPA.  Thereafter, the surface water drainage
arrangements shall be implemented in full accordance with the agreed details and the
development shall not be occupied until the surface drainage works have been
completed in accordance with the agreed details.  Once provided, the works shall
thereafter be permanently retained as such. 
Reason: To ensure that the disposal of surface water from the site is dealt with in a
safe and sustainable manner, to return it to the natural water cycle with minimal
adverse impact on people and the environment and to alleviate the potential for on-
site and off-site flooding, and to ensure the provision of a satisfactory SUDS pond and
to minimise any flood risk. 
20. Prior to the commencement of development, full details of a contemporary
trash/security screen at the culvert inlet on Hamilton Road shall be submitted for the
written approval of the Planning Service.  For the avoidance of doubt, this shall include
details of an inspection and maintenance regime in respect of the Hamilton Road
culvert and screen.  Thereafter, the works shall be implemented in full accordance with
the agreed details prior to the occupancy of the first approved dwellinghouses.  Once
provided, the works shall thereafter be permanently retained as such, and the culvert
and screen shall be inspected and maintained in accordance with the approved
management schedule to the satisfaction of the Council as Planning Authority. 
Reason: To minimise any flood risk in the area. 
21. Notwithstanding the development hereby approved, prior to the development being
brought into use, the approved scheme for the mitigation of noise shown in the
approved Noise Impact Assessment shall be implemented in full, and where
appropriate, shall be maintained in accordance with the approved scheme to the
satisfaction of the Council as Planning Authority. 
Reason: In the interests of protecting the residential amenities of the new
development. 
22. Notwithstanding the details hereby approved, acoustic fencing will be required to the
satisfaction of Environmental Services.  Prior to the commencement of development,
full details shall be submitted for the written approval by the Planning Service.  For the
avoidance of doubt the fencing shall ensure that between the house of 0800 and 200
the measured noise level emitted from the Engineering works (LAeq 1hour) shall not
exceed the pre-existing background noise level (LA90 (15 mins) by more than 4dB (A)
when measured in accordance with BS4142:2014 at buildings where people are likely
to be affected.  Between the houses of 2000 and 0800 the noise emitted from the
premises (LAeq (15 mins)) shall not exceed the pre-existing background noise level
(LA90 (15 mins) by more than 4dB (A) when measured in accordance with
BS4142:2014 at buildings where people are likely to be affected. 
Reason: In the interests of protecting the residential amenities of the new
development. 
23. Notwithstanding the development hereby approved, the internal noise levels shall
comply with BS 8233:2014 Guidance on sound insulation and noise reduction for
buildings as follows:-  
136

Page 137

The scheme shall ensure that:-
a) The internal levels with windows open (or under exceptional circumstances closed)
do not exceed an LAeq,16hr   of 40dB daytime (07:00 – 23:00) 
b) The internal levels with windows open (or under exceptional circumstances closed)
do not exceed an LAeq,8hr   of 30dB night-time (23:00 – 07:00).
c) The internal levels with windows open (or under exceptional circumstances closed)
do not exceed an LA,max   of 45dB  night-time (23:00 – 07:00).
d) The external levels shall not exceed an LAeq,16hr of 50dB daytime in any garden
areas, when measured free-field 
The Internal Noise Rating Values, within any residential property and resultant from
the development, shall not exceed-
 NR25 between 23.00hrs and 08.00hrs
 NR35 between 08.00hrs and 23.00hrs 
Reason: In the interests of protecting the residential amenities of the new
development. 
24. No works in connection with the development hereby approved shall commence
unless a scheme of hard and soft landscaping works has been submitted to and
approved in writing by the planning authority. Details of the scheme shall include: 
a) A tree survey in accordance with BS 5837:2012. 
b) Existing landscape features and vegetation to be retained. 
c) Protection measures for the landscape features to be retained. 
d) Existing and proposed finished levels. 
e) The location of new trees, shrubs, hedges, grassed areas and water features,
including enhanced planting for the hedgerow.
f) A schedule of planting to comprise species, plant sizes and proposed numbers and
density. 
g) Details of any top-soiling or other treatment to the ground.
h) Sections and other necessary details of any mounding, earthworks and hard
landscaping.
i) The location, design and materials of all hard landscaping works including walls,
fences, gates, street furniture and play equipment. 
j) An indication of existing trees, shrubs and hedges to be removed. 
k) A programme for the implementation, completion and subsequent management of
the proposed landscaping, including any phasing. 
All soft and hard landscaping proposals shall be carried out in accordance with the
approved planting scheme and management programme shall be completed to the
satisfaction of the Council as Planning Authority during the first available planting
season following occupation of the buildings or completion of the development hereby
approved, whichever is the sooner.  Any planting which, within a period of 5 years from
the completion of the development, in the opinion of the planning authority is dying,
being severely damaged or becoming seriously diseased, shall be replaced by plants
of similar size and species to those originally required to be planted. 
Once provided, all hard landscaping works shall thereafter be permanently retained. 
Reason: To ensure the implementation and management of a satisfactory scheme of
landscaping which will help to integrate the proposed development into the local 
25.  Prior to the commencement of development, full details of the design and location of
all boundary treatments, including walls, fences and any retaining walls, enclosures,
screening and paving and hard surfacing materials to be erected or installed on the
137

Page 138

site shall be submitted for the written approval of the Planning Service.  Thereafter,
the boundary treatments shall be erected in full accordance with the agreed details
prior to the occupancy of the first approved dwellinghouses.  Once provided, all
landscaping works shall thereafter be permanently retained. 
Reason: In the interests of visual amenity. 
26. That notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (or any such order revoking or re-
enacting that order), no gates, fences, walls or other means of enclosure shall be
erected between the front of the dwellinghouse and the adjoining road. 
Reason: In order to retain effective planning control in the interests of the visual
amenities of the area, to protect open space. 
27. That no development shall take place within the development site as outlined in red
on the approved plan until the developer has secured the implementation of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted by the applicant, agreed by the West of
Scotland Archaeology Service, and approved by the Planning Authority.  Thereafter
the developer shall ensure that the programme of archaeological works is fully
implemented and that all recording and recovery of archaeological resources within
the development site is undertaken to the satisfaction of the Planning Authority in
agreement with the West of Scotland Archaeology Service. 
Reason: To safeguard and allow any archaeological remains which may exist on the
site to be satisfactorily recorded. 
28.  For the avoidance of doubt, no work or crossings of the high-pressure gas apparatus
shall be carried out on site unless detailed consultation has taken place with Scottish
Gas Networks.  SGN must be consulted on all works within 35 metres of the high-
pressure gas pipelines (Major Accident Hazard Pipelines), with the aim of ensuring the
pipeline and the integrity of the servitude or easement area are not compromised. 
Thereafter, works shall be carried out in accordance with the agreed position of
Scottish Gas Networks in consultation with the Planning Authority. 
Reason: In the interests of public safety. 
29. For the avoidance of doubt, no mechanical excavations shall take place above or
within 0.5m of the low-pressure gas system, within 0.5m of the medium pressure gas
system or within 3m of the intermediate pressure gas system, and that confirmation of
the position of the gas mains shall be undertaken by using hand dug trial holes. 
Reason: In the interests of public safety. 
30. Prior to development commencing on site, a scheme for the control and mitigation of
dust shall be submitted to and approved in writing by the Council as Planning Authority. 
No changes to the approved scheme shall take place unless agreed in writing by the
Council as Planning Authority.  The scheme shall thereafter be implemented in
accordance with a programme to be agreed in writing with the Council as Planning
Authority. 
Reason: In the interests of amenity. 
138

Page 139

139

Page 140

140

Page 141

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/21/2031
Substitution of house types and additional 6 No. dwellinghouses,
amendment to SUDS proposals, addition of sub-station, addition of
gas governor and alteration of cycle path alignment (Amendment to
CR/17/0076) 
1 Summary application information
Amended
•  Application type:  Further application
•  
Applicant:  Dundas Estates & Development Co Ltd 
•  Location:  Phase 2D
Land 180M Northwest of Dalton School Lodge
Gilbertfield Road
Cambuslang
South Lanarkshire  
[1purpose]
2 Recommendation
2.1 The Committee is asked to approve the following recommendation:-
[recs]
(1) Grant Detailed Planning Permission – Based on Conditions Listed.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
(2) If planning consent is granted, the decision notice should be withheld until a
Planning Obligation in respect of a financial contribution for the
improvement/upgrading of education provision in the area has been concluded
between the applicant and the Council. 
In accordance with agreed procedure, should there be no significant progress,
on behalf of the applicant, towards the conclusion of the Planning Obligation
within 6 months of the date of the Committee, the proposed development may
be refused on the basis that, without the planning control/developer contribution
which would be secured by the Planning Obligation, the proposed development
would be unacceptable. 
11
141

Page 142

If, however, this matter is being progressed satisfactorily the applicant will be
offered the opportunity to enter into a Processing Agreement, if this is not
already in place.  This will set an alternative agreed timescale for the conclusion
of the Planning Obligation. 
All reasonable legal costs incurred by the Council in association with the above
Obligation shall be borne by the developers. 
3 Other information
♦ Applicant’s Agent: Debbie Reeves
♦ Council Area/Ward: 14 Cambuslang East
♦ Policy Reference(s): Policy 1: Spatial Strategy
Policy 2: Climate Change
SDDC2: Flood Risk
SDDC3: Sustainable Drainage Systems
SDCC4: Sustainable Transport
Policy 3 General Urban Areas
Policy 5 Development Management and
Placemaking
DM1: New Development Design
DM15: Water Supply
DM16: Foul Drainage and Sewerage
Policy 11: Housing Land
Policy 12: Affordable Housing and Housing Choice
Policy 13: Green Network and Greenspace
Policy 14: Natural and Historic Environment
NHE16: Landscape
Policy 15: Travel and Transport
Policy 16: Water Environment and Flooding 
♦   Representations: 
► 2  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
♦   Consultations:   
Roads and Transportation Services (Development
Management Team) 
Environmental Services
Roads Flood Risk Management 
Roads and Transportation Services (Structures) 
Community and Enterprise Resources - Play Provision
Community Contributions 
Education Resources School Modernisation Team 
Housing Services 
Scottish Gas Network 
Health and Safety Executive 
West of Scotland Archaeology Service  
142

Page 143

Planning Application Report
1 Application Site
1.1 The application site is located within the Cambuslang/Rutherglen settlement boundary
and is positioned between Gilbertfield Road and Lightburn Road, towards the
southeast of Cambuslang, south of Hamilton Road A724, and west of Flemington
Road to the east.  It comprises former agricultural land and is south and east of a gas
pumping station.  The site is gently sloping and measures approximately 2.6ha, with
the proposed housing development area for this phase some 2.2ha.  A burn runs along
the northwest through the site.  Two gas pipelines run though the site adjacent to the
burn. Dalton School Lodge lies approximately 180m southeast of the site. 
1.2 The site forms part of a wider residential development site developed by Dundas
Estates.  This site is known as Phase 2D.  There is an extensive planning history
pertaining to this site as noted further below.  As such, the site currently comprises a
construction site, with the surrounding areas proposed or under construction for
associated phases.  Phase 2C lies to the immediate north, sharing the same access,
while Phases 2A and 2B are located to the northwest on the opposite side of the
watercourse.  The site overlaps with Phase 2B and Phase 2C where the SuDS scheme
and surrounding open space is provided and cycleway is partially proposed. 
2 Proposal(s)
2.1 The wider site benefits from permission for a large-scale housing development
comprising 128 dwellinghouses across 4 phases, with Phase 2A under construction. 
The application site subject of this application, known as Phase 2D, benefits from
planning permission under reference CR/17/0076 for a residential development
comprising 47 dwellinghouses.  This application seeks to substitute house types,
resulting in an additional 6 units, increasing for 47 dwellinghouses previously
approved, to 53.  Furthermore, the proposal also seeks to amend the layout and
infrastructure provision to realign footpaths and cycleways.  The proposal also seeks
an amendment to the SuDS proposals, and the addition of a sub-station and gas
governor. 
2.2 Phase 2D is located at the most south-eastern extent of the overall development site,
bound by Flemington Road to the east. 53 units are proposed in this phase, taking
access through Phase 2C to the north off Gilbertfield Road, heading south to serve
Plots 117-132 laid out in a linear row north-south.  The access road also runs southeast
then northeast serving the remainder of the development, where the proposed housing
is most dense.  All proposed properties would front onto internal access roads, with
rear gardens backing onto each other.  A cul-de-sac is proposed to the eastern side
serving Plots 85-94.  Plots along the southern edge are to be served by small access
lanes and shared drives.  The access road at Plot 75 would continue north to lop round
and connect to the access road which serves Phase 2C.  A landscape buffer is
proposed along the Flemington Road and Gilbertfield Road edge. 
2.3 The proposed house substitutions would provide for a mix of 53 detached, semi-
detached and terraced units, resulting in a change from predominantly detached units. 
Parking would largely be provided in curtilage, apart from where the terraced units are
proposed at Plots 76-79, where parking is provided to the front.  Boundary treatments
would comprise a mix of hedging, 1.8m high stone screen walls, low walls with railings,
and timber fencing between houses, and post and wire fencing to open areas.  Tree
planting is proposed within the open space areas. The housing mix is proposed as
follows:- 
143

Page 144

  1x Brodie 3-bed semi-detached
 7x Gilroy 3-bed end terrace and semi-detached
 2x Elliot 3-bed mid terrace
 6x Pentland 3-bed semi-detached
 3x Pentland 3-bed detached
 5x Harper 3-bed detached 
 3x Carnegie 3-bed detached
 3x Dewar 3-bed detached
 1x Stuart 3-bed detached 
 4x Matheson 4-bed detached
 2x Middleton 4-bed detached
 1x Wallace 4-bed detached
 2x Kendrick 4-bed detached
 1x Lewis 4-bed detached
 3x Gillespie Plus 4-bed detached 
 3x Dunbar 4-bed detached 
 2x McArthur 5-bed detached
 4x Maitland 5-bed detached 
Finishing materials are to include concrete roof tiles, render walls, upvc windows and
doors, and coloured fascia detailing. 
2.4 The proposed cycle/footway would follow the route proposed under Phase 2C (as
detailed in planning application P/21/1962), with no connections through Phase 2D. 
The path would continue south outwith the site boundary along Gilbertfield Road. 
2.5 For clarification, the red line site boundary for this proposed application matches the
red line boundary approved under CR/17/0076.  The wider site now contains the
proposed new culvert and gas station and includes the realigned cycle path.  The
general roads layout, open space, and cycle links remain as approved under
CR/17/0076, with only realigned routes and amended house types and siting
proposed, deeming this an amendment application.  The SuDS scheme has been
slightly repositioned within the same location as that previously approved.  Therefore,
the main considerations are the revised housing layouts and design and technical
matters associated with these amendments.  The new culvert proposal is considered
under associated applications P/21/1582 and P/21/1962. 
2.6 The general layout would remain consistent with the earlier approvals and incorporate
servicing within the adjacent phases.  As mentioned, open space is to be provided to
the north and a SuDS area to the northeast.  Footways and cycle paths are continued
to be proposed throughout the wider development sites, with connections to the
reconfigured Phase 2B layout proposed through Phase 2C; and a culvert is proposed
to be aligned over the burn to replace the earlier bridge proposal, with the cycle path
extending over the new culvert leading to the adjacent development to the north.  A
new footpath is proposed along Gilbertfield Road heading south east.  The proposal
would connect to the public drainage and water supply networks.  The SuDS scheme
is to be slightly repositioned, but at the same site.  A new sub-station and gas
infrastructure is proposed at the northern corner of this site, adjacent to where the
cycle path connects to Lightburn Road, in Phase 2B.  Landscaping is proposed around
these structures, and planting is proposed throughout the SuDS area and open space
area, as well as along the north running access road, with feature planting around the
shared space area at the entrance. 
144

Page 145

3 Background
3.1 Local Plan Status
3.1.1 In terms of local plan policy, the site is located within the Cambuslang/Rutherglen
settlement boundary in the adopted South Lanarkshire Local Development Plan 2
(SLLDP2).  The application site and associated proposal is affected by Policy 1:
Spatial Strategy, Policy 2: Climate Change, Policy 3: General Urban Areas and
Settlements, Policy 5: Development Management and Placemaking, Policy 11:
Housing, Policy 12: Affordable Housing, Policy 13: Green Network and Greenspace,
Policy 14: Natural and Historic Environment, Policy 15: Travel and Transport, and
Policy 16:  Water Environment and Flooding as well as associated detailed
development management and sustainable development policies.  The content and
aims of these policies are discussed in section 6 of this report. 
3.2 Relevant Government Advice/Policy
3.2.1 Relevant Government guidance is set out within the consolidated Scottish Planning
Policy (SPP) 2014 which confirms the requirement for the Council to maintain a five-
year supply of effective housing land and also provides policy guidance relating to 
the provision of affordable housing.  Planning authorities are required to promote  the
efficient use of land by directing development towards sites within existing 
settlements where possible to make effective use of existing infrastructure and
services.  SPP also introduces a presumption in favour of development that contributes
to sustainable development. 
3.3 Planning Background
3.3.1 There is an extensive planning background to this site and associated phases.  This
application forms part of a suite of applications seeking to update house types and
slightly amend housing numbers to that previously approved.  The relevant reference
numbers and breakdowns are included in the table below:- 
Phase Original Reference and
Housing Numbers
Current Reference and Housing
Numbers
2A CR/15/0046 - 42 units,
granted 7 December 2020. 
P/20/1729 - amendment to
previous approval including
substitution of house types,
alteration of road alignment,
amendment to SuDS,
addition of sub-station and
new foot and cycle paths,
granted 1 April 2021.
P/20/1729 - 41 units,
amendment to CR/15/0046
seeking substitution of house
types, granted 1 April 2021. 
No further changes proposed to
this phase of development. 
2B CR/16/0138 - 13 units
comprising 9 flats and 4
cottage flats, granted 7
December 2020. 
P/20/1729 - 1 unit included
in Phase 2A now as
amended covered by Phase
2B, granted1 April 2021.
P/21/1582 - current pending
application comprising 14 units
(amendment to earlier
approval). 
145

Page 146

2C CR/17/0039 - 26 units,
granted 7 December 2020.
P/21/1962 - current pending
application comprising 26 units
(amendment to earlier
approval).
2D CR/17/0076 - 47 units,
granted 7 December 2020.
P/21/2031- current pending
application comprising 53 units
(amendment to earlier
approval). 
3.3.2 The total housing numbers have increased from 128 units across the four sites, to 134
units, with the additional 6 units contained in Phase 2D.  The layout across all sites
has been amended to include a culvert to replace the original proposed footbridge. 
3.3.4 All applications remain extant, establishing the principle of development.  Any works
which have commenced on site form part of these earlier approvals. 
3.3.5 The previous applications were covered by a S69 upfront payment for contributions
towards affordable housing, education, and community. 
4 Consultations
4.1 Roads and Transportation Services (Development Management Team) 
Response:  raise no objections to the above proposals subject to the inclusion of the
conditions previously added to CR/16/0138 and a separate condition pertaining to the
proposed culvert. 
4.2 Environmental Services
Response:  has no objections to the proposal 
4.3 Roads Flood Risk Management 
Response:  have no objection to the proposed development.  This service notes that
the self-certification in regard to the sustainable drainage system for each phase of
development, will be captured as part of the Roads Construction Consent process
which is underway for each of these developments. 
4.4 Roads and Transportation Services (Structures)
Response: The Structures Team note that the proposals include for the provision of
an adoptable culvert to accommodate an unnamed watercourse.  The proposed
adoptable culvert will be subject to the full Technical Approval process as detailed in
the Design Manual for Roads and Bridges.  South Lanarkshire Council will be the
Approving Authority.  In terms of the Technical Approval process the proposed culvert
is a Category 1 structure.  The process includes for the submission and subsequent
approval by the Approving Authority of an Approval in Principle (AIP) submission.  The
AIP submitted in support of the proposals was accepted and approved on behalf of
the Approval Authority on 12 September 2022. 
4.5 Community and Enterprise Resources - Play Provision Community
Contributions 
Response:  No response has been provided to date.  Any contributions will be sought
by way of upfront payment before a decision is issued should permission be granted. 
4.6 Education Resources School Modernisation Team 
Response: This service seeks a per unit contribution for any additional units.  Over
three applications a total of 6 additional units are proposed, resulting in an additional
146

Page 147

contribution requirement which will be secured by an upfront payment prior to any
permission granted being issued. 
4.7 Housing Services 
Response:  Has confirmed that there would be no additional affordable housing
provision due to the small increase in numbers across all 3 pending applications. 
4.8  Scottish Gas Networks (SGN) 
Response: Withdraw any objection to the planning application on the condition that
SGN is consulted on all works within 35 metres of its high-pressure gas pipelines
(Major Accident Hazard Pipelines), with the aim of ensuring the pipeline and the
integrity of the servitude or easement area are not compromised. 
4.9 Health and Safety Executive (HSE) 
Response: Comment that based on the information provided for the planning
application, the revised “Does Not Advise Against” recommendation generated is
appropriate as HSE would not advise against a sensitivity level 2 development in the
middle consultation zone. 
4.10 Consult – West of Scotland Archaeology Service (WOSAS)
Response:  Note the proximity of archaeological features and request a condition
seeking the implementation of a programme of archaeological works and written
scheme of investigation be attached to any permission granted. This would allow the
Council to ensure that the correct level of mitigation fieldwork is undertaken and
reported on. 
5 Representation(s)
5.1 Statutory neighbour notification was undertaken, and the proposal received 2 valid
letters of objection.  The grounds of the objections are summarised as follows:- 
a) Greenbelt erosion
Response:  The site is located out with the greenbelt designated area, which
begins further south and east, with Flemington Road as the boundary. 
Therefore, the site is not considered to affect the qualities for which the
greenbelt is protected.  However, it is recognised that an inevitable degree of
impact will result from this development, although this is considered acceptable
given the housing land allocation and the satisfactory design and layout of the
scheme.  Appropriate buffers along the Flemington Road boundary will lessen
any impact and landscaping will be sought by way of condition to support this
further.  The site is covered by a green network designation, as discussed
further below. 
b) Road safety including pedestrian safety along Flemington Road,
construction traffic and the development of walls up to the road edge and
cycle path.  Speed bumps and pavements are required. 
Response:  The Council’s Roads and Transportation Service have carefully
considered the application and raise no significant road safety concerns to
warrant refusal in this instance.  The road network will be subject to separate
Road Construction Consent processes and will be completed to a technical
standard.  Conditions relating to traffic management and cycleways/footways
will be attached to any permission granted.  
147

Page 148

c)  Drainage which may result in additional flooding in the surrounding area,
especially on the main Hamilton Road.  Flooding mitigation should be
provided.
Response: Conditions relating to drainage are to be attached to any
permission granted to address this.  The Council’s Flooding Service raise no
objections on flood risk terms. 
d)  Any reduction in SuDS will result in a loss of privacy and overlook number
7 Dechmont Cottages.
Response: There is approximately 30m between Dechmont Cottages and the
development site, separated by Hamilton Road and screened by hedging and
proposed further landscaping.  In addition, the SuDS area will be open
landscaped, therefore, there would be no direct overlooking, and the layout is
deemed acceptable. 
5.2 These letters are available for inspection on the planning portal. 
6 Assessment and Conclusions
6.1 Full planning permission is sought for the erection of 53 dwellinghouses, proposed as
substituted house plots on an earlier approval, as well as a revised layout including a
proposed culvert and foot and cycle paths and gas station at land 180m northwest of
Dalton School Lodge, Gilbertfield Road, Cambuslang.  The main issues to be
addressed in the determination of this application includes the acceptability in principle
of the development, the layout, siting and design of the proposed scheme, and an
assessment of technical matters.  The policies contained within the South Lanarkshire
Local Development Plan 2 are the main consideration in this case, together with an
assessment of any material planning considerations. 
6.2 In terms of a spatial strategy, Policy 1 of the SLLDP2 directs larger developments to
sustainable urban locations, and together with Policy 11 seeks to ensure that there is
an effective and mixed housing land supply.  Policy 3 states that residential
developments within urban areas and settlements, including Cambuslang/Rutherglen
for which this site is situated within, will generally be acceptable, and Policy 5 sets out
design criteria required to deliver successful places as discussed further below. 
6.3 As outlined above, the site benefits from extant consent under previous applications
for residential development, and this application seeks only a change in layout, siting
and design as well as house type and mix.  Therefore, the principle of development
has been established in line with sustainable development requirements for residential
proposals outlined in the above policies.  Although the earlier consent was granted
under a previous Local Development Plan, the site continues to be allocated for
housing land under the current SLLDP2 within the settlement maps, and therefore the
principle of residential development at this location is acceptable. 
6.4 In terms of housing numbers, permission was granted for 47 houses, predominantly
comprising detached units, with 10 semi-detached units.  This revised scheme differs
slightly under the current application as more semi-detached and terraced units are
proposed, creating a further housing mix. 
6.5 Policy 11 states that developers must provide a range of house size and types to meet
local needs and market demands.  It is considered in this case that the revised layout
contributes to a wider mix, and while housing numbers have increased, this is only a
small number of 6 additional units and consideration has been given to the type of
148

Page 149

housing at this site, and on balance the mix remains acceptable.  The Council’s
Housing service raise no comments in relation to this. 
6.6 The additional 6 units is not considered to give rise to significant additional
infrastructure requirements on this site and in the wider vicinity, and no additional
contributions are required in respect of this, apart from in relation to Education which
will be secured by way of a cash contribution per additional unit.  The Council’s
Affordable Housing Service has confirmed that no additional contributions are required
in this regard due to the small increase in numbers.  Overall, the effective land supply,
the substituted house types, layout and housing mix is considered to be in accordance
with Policy 1, 3, 5 and 11 of the South Lanarkshire LDP2.  This is one phase of a wider
development and is considered to fit successfully in the wider scheme both in terms of
placemaking and housing supply. 
6.7 Turning to layout, siting and design, together Policies 3, 5 and DM1 set out criteria
which must be met to ensure that the proposal contributes, in a positive manner, to
the quality of the surrounding built and natural environment, its character and
appearance.  This includes that the development is appropriate in its siting, layout and
density, and responds to this in terms of design and scale.  Patterns of development
and surrounding amenity should be respected.  In particular, Policy DM1 seeks to
promote quality and sustainability and ensure that all new developments meet the six
qualities of a successful place, including being distinctive whilst respecting the local
identity and creating a sense of place; being safe and pleasant; welcoming; adaptable;
efficient and well connected. 
6.8 Overall, the development in this phase generally follows the same pattern as
previously approved, with only minor realignments to path networks and SuDS
schemes, and the inclusion of a sub station and gas governor.  The changes can be
adequately accommodated within the site area and level changes.  The proposed
layout would continue to allow for a predominantly linear pattern of development, with
houses fronting along the main access road, and small lanes and cul de sac areas
proposed, offering a change to the uniform layout, creating a sense of place which
responds to the dense area of development in this phase.  In terms of house type
designs, there is a varied mix responding to market demands.  The properties
comprise detached, semi-detached and terraced units, finished in appropriate
materials with sufficient parking provision.  Hard and soft landscaping also creates a
welcoming, safe and pleasant appearance and responds to the site context in terms
of existing trees, topography and providing a buffer around the site boundaries. 
Overall, the proposal is considered to be appropriately designed and scaled in
accordance with the aforementioned policies. 
6.9 The house types and layout have been considered to avoid any negative amenity
impacts, with suitable fencing providing privacy to rear gardens, and adequate
separation to avoid direct overlooking, and no significant rear projections to avoid
overshadowing.  There is considerable distance from existing surrounding properties
to mitigate against any negative effects arising from this development.  While an
inevitable degree of change will result in the landscape setting from this development,
it is not considered to be overly obtrusive and offers sufficient open space to lessen
any impact, ensuring that the landscape character is not significantly adversely
affected in accordance with Policy NHE16.  Conditions will be attached to any
permission granted seeking full landscaping details including retained and proposed
planting.  This should support biodiversity enhancements also.  In summary, the
proposal is acceptable in terms of layout, siting and design, with no significant negative
impact on surrounding amenity, generally satisfying the criteria set out in DM1. 
149

Page 150

6.10 In terms of technical matters, a new culvert is proposed to replace a footbridge which
formed part of the earlier approved applications in the adjacent phases.  The developer
has advised this is sought for reasons to avoid impact on the gas pipeline
infrastructure.  SGN have responded with no objection to the proposals in proximity of
the pipelines and following consultation, HSE does not advise against the granting of
permission.  Together Roads Development, Flooding and Structures have reviewed
the proposal and are satisfied that the culvert can be suitably installed with no
significant impact on servicing, flooding or access and connectivity in accordance with
SDDC2, subject to technical design.  Policy 16 sets out that engineering works which
have an unacceptable impact will not be supported.  The culvert proposal has
undergone significant review with consultees confirming no objections following
submission of detailed design proposals, agreements in principle and will form part of
the conditions of any permission granted.  The substations are small scale and do not
affect the general placemaking of the site.  Correspondence from SEPA confirms that
the culvert is minimal and does not constitute realignment therefore no authorisation
is required from SEPA for the works, and they have confirmed they did not require to
be consulted.  In regard to the water environment, as the proposal would connect to
the public water supply and drainage network it is considered acceptable in line with
DM15 and DM16, with conditions attached where relevant.  SDCC3 supports SuDS
developments which are integral to the overall design. In this case, the SuDS scheme
follows that previously approved in terms of its location within the site, albeit it is slightly
repositioned.  It connects to the open space, offering appropriate landscaping and a
softer edge to the development, so as not to negatively affect the setting of the area. 
6.11 Together the SuDS arrangement and open space area provides ample and useable
open space within the development site in addition to private amenity garden ground. 
This creates recreational opportunities and promotes walking and cycling in
accordance with policies listed above and contributes to sustainability and the visual
quality of the site.  The siting of the open space also allows for appropriate separation
between Dechmont Cottages further northeast.  Together with proposed landscape
buffers, the open space layout and distribution is in compliance with LDP policies. 
6.12 The site is designated as a green network. Policy 13 seeks to protect existing
resources from loss or fragmentation due to development, but also recognises there
are opportunities to extend and enhance the network and provide new links, which is
the case in this proposal as new footways and cycle routes are proposed, together
with the open space provision and buffer zone around the pipelines and watercourse. 
This allows for blue-green networks and contributes towards successful placemaking
in the overall development scheme.  Open space is proposed to the south and this
would not result in a negative effect on the biodiversity of the site, with no protected
species or significant additional loss of trees.  Connectivity through active travel
methods is proposed and therefore overall, the principle of development within the
green network is accepted as per Policy 1 criteria 10 and Policy 13 as the green
network is enhanced through new proposed connections, amenity and landscaping
proposals as part of this established allocated housing development site.  An invasive
species report was submitted with the application and concluded that no invasive
species were found on the site as reported on. 
6.13 Through such new proposed connections active travel is promoted in line with Policy
15 as existing routes are safeguarded and enhanced. In terms of access, this would
remain to be obtained from Gilbertfield Road.  Internal road layouts are suitable, with
adequate provision for parking.  Footway and cycleway connections have been
realigned to fit with the proposed culvert and this is considered to offer adequate
connectivity and promote active travel, leading to a successful, well-connected place. 
Footpaths outwith the site boundary will be subject of further details to be submitted
150

Page 151

as part of conditions and will result in improved accessibility and connectivity
throughout and surrounding the site.  With regard to road safety, Policy 15 requires all
new development proposals to consider the resulting impacts of traffic growth.  The
site has been fully assessed by Roads and Transportation Services who have offered
no objections, subject to conditions being reattached from the previous approval, and
in relation to the culvert design.  The proposal can therefore be considered acceptable
in transportation terms. 
6.14 Overall, in line with the aims of Policy 2, the development is sustainably located as an
allocated housing site with acceptable SuDS provision, avoids flood risk and promotes
active travel, supports the green network and provides EV charging all contributing to
sustainable development to reduce climate change in line with SDCC2, SDCC3 and
SDCC4. 
6.15 In conclusion, the site benefits from extant planning permission for an established
housing site, meaning that many considerations are carried forward from these earlier
approvals.  The main issues of the reconfigured layout and housing types are deemed
acceptable as a suitable mix is provided and is appropriately designed.  The site can
adequately accommodate the revised layout, with ample open space and it can be
suitably accessed and serviced.  The proposal has been subject to detailed
consultation, in particular to the culvert proposal, and all technical matters have been
addressed, and there are no material planning reasons which would warrant a refusal
in this instance.  Additional educational contributions will be sought, and no further
contributions are required in this particular phase of development, as the uplift in units
is small scale.  Therefore, the proposal complies with all relevant policies contained
within the South Lanarkshire Local Development Plan 2, and the application is
recommended for approval, subject to conditions.  For the avoidance of doubt, relevant
conditions from the previous consent will be re-attached to any permission granted. 
7 Reasons for Decision
7.1 The development would continue to deliver the allocated housing site and offer an
updated housing mix.  The proposal is appropriately designed and would have no
adverse impacts on the surrounding landscape or character and amenity of the area. 
All technical matters have been addressed, and the proposal satisfies all relevant
policies contained within the South Lanarkshire Local Development Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 30 September 2022 
Previous references
 CR/15/0046
 CR/16/0138
 CR/17/0039
 CR/17/0076
 P/20/1729 
List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter dated 23 December 2021  
151

Page 152

► Consultations
Roads and Transportation Services (Development
Management Team) 
24.08.2022
Environmental Services 31.01.2022
Roads Flood Risk Management  09.09.2022
Roads and Transportation Services (Structures) 
Housing Services 
West of Scotland Archaeology Service 
13.09.2022 
12.09.2022 
07.01.2022
Education Resources School Modernisation Team 
Scottish Gas Network 
Health and Safety Executive 
Community and Enterprise Resources - Play Provision
Community Contributions 
21.07.2022 
02.09.2022 
14.09.2022   
► Representations           Dated:
Mrs Angela McIntyre, 7 Dechmont Cottages, Cambuslang,
Glasgow, G72 7XP 
07.01.2022 
Mr Edmund McKee, 1 Flemington Farm Cottages,
Cambuslang, Glasgow, G72 8YE 
15.01.2022 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact: - 
Jane Weir, Planning Officer, Montrose House, 154 Montrose Crescent, Hamilton, ML3 6LB
Phone: 07795 455 502   
Email: jane.weir@southlanarkshire.gov.uk  
152

Page 153

Detailed planning application 
Paper apart – Application number: P/21/2031 
Conditions and reasons 
1. No dwellinghouse hereby approved shall be occupied unless a Residential Travel Plan
has been submitted to and approved in writing by the planning authority in consultation
with the Roads Service.  The Travel Plan shall encourage more sustainable means of
travel and shall include mode share targets.  No dwellinghouse shall be occupied
unless the measures set out in its approved Travel Plan have been issued to all
homeowners. 
Reason: In the interests of sustainable travel. 
2. No works in connection with the development hereby approved shall commence
unless details of the refuse bin uplift store area[s] have been submitted to and
approved in writing by the planning authority.  The area[s] shall be constructed behind
any visibility splay and shall be designed so as to be accessible for refuse bin uplift
and to prevent empty bins from being wind-blown.  No dwellinghouse shall be
occupied unless the refuse bin uplift store area[s] have been provided and surfaced in
accordance with the approved details.  Once provided, the refuse bin uplift store
area[s] shall thereafter be permanently retained as such. 
Reason: To ensure the provision of an appropriate means of servicing in the interests
of road safety. 
3. Notwithstanding the development hereby approved, no construction activities
connected with the culvert and associated earthworks shall commence until full details
of the culvert design has been submitted and approved by South Lanarkshire Council
as Roads Authority and the Planning Service.  The detailed design shall include
ground investigation specific to the structure and also a full earthworks Specification
all complying with the Design Manual for Roads and Bridges and the Manual of
Contract Documents for Highway Works. 
The design and layout of all new infrastructure and improvements shall be in
accordance with the Design Manual for Roads and Bridges and SCOTS design
guidance unless otherwise agreed by the Council as Planning and Roads Authority. 
Reason: In the interests of public safety. 
4. Prior to the commencement of development, a full Safety Audit, in accordance with
the Institute of Highways and Transportation Guidelines, shall be submitted for the
written approval of the Planning Service in consultation with the Roads Service for
approval for all infrastructure to be constructed and adopted, or altered, on the public
road. 
Reason: In the interests of public safety. 
5. No dwellinghouse hereby approved shall be occupied unless its driveway, parking and
turning area has been provided and fully paved in accordance with details to be
submitted to and approved in writing by the Planning Authority.  The maximum
gradient of each driveway shall not exceed 10% gradient and each driveway shall be
internally drained and formed in such a way to prevent any flow of surface water either
onto or from the public road.  The first 2m of a driveway, behind the heel of the footway
153

Page 154

shall be hard surfaced.  All driveways shall be designed with car parking for each
vehicle to a minimum of 3m x 6m, with provision to meet Council car parking standards. 
Once provided, all parking and turning areas shall thereafter be permanently retained
as such. 
Reason: To ensure the timely completion of each driveway to an adequate standard
to prevent the carriage of loose driveway material on to the public road in the interests
of road safety. 
6. For the avoidance of doubt, the first 12.5m of any road within the site shall not exceed
a gradient of 2% and no driveway or access will be permitted within 15m of the junction
off Gilbertfield Road.  The junction improvement at Gilbertfield Road/Flemington Road
(by the implementation of the 3metre wide footway/cycleway) shall have minimum radii
of 10.5 metres. 
Reason: In the interests of traffic and pedestrian safety 
7. Prior to commencement of development, a Traffic Management Plan (TMP), including
details of the traffic routes of construction vehicles, site compound, show where all
vehicles and deliveries will be located, on-site parking and wheel washing facilities
shall be submitted for the written approval of the Planning Service in consultation with
the Roads Service.  The TMP should restrict all site work (incl. vehicle movements)
from operating within the school opening and closing times, unless otherwise agreed. 
No work shall commence until the TMP has been approved in writing by the Council
as Planning Authority.  Thereafter, the works shall be carried out in full accordance
with the agreed details. 
Reason: In the interests of road and public safety. 
8. Prior to the commencement of development, and notwithstanding Conditions 9-14
inclusive, a drawing showing the internal footways, cycleways and additional
footway/cycleway connections, together with appropriate drainage installation shall be
submitted for the written approval of the Planning Service in consultation with the
Roads Service.  Thereafter, the path shall be implemented in full accordance with the
agreed details prior to the occupancy of the first approved dwellinghouses.  Once
provided, the cycleway and footway shall thereafter be permanently retained as such. 
For the avoidance of doubt, internal footways should be 2m wide. 
Reason: To ensure safe access for pedestrians to the existing footpath network and
the satisfactory provision of a cycle route. 
9. Prior to the commencement of development, full details of a surfaced
cycleway/footway connection between Hamilton Road and the internal development
site roads shall be submitted for the written approval of the Planning Service in
consultation with the Roads Service.  Thereafter, the path shall be implemented in full
accordance with the agreed details prior to the occupancy of the first approved
dwellinghouses.  Once provided, the cycleway and footway shall thereafter be
permanently retained as such. 
The cycle path also acts as a maintenance route for vehicles to access the substation
and should therefore be a minimum of 3.7m in width and constructed to the same
standard as standard carriageway. 
Reason: To ensure safe access for pedestrians to the existing footpath network and
the satisfactory provision of a cycle route. 
154

Page 155

10. Prior to the commencement of development, full details of a footway along Gilbertfield
Road to connect to phase 2 shall be submitted for the written approval of the Planning
Service in consultation with the Roads Service.  For the avoidance of doubt, the
footway shall be 2m wide and surfaced to adoptable standards.  Thereafter, the path
shall be implemented in full accordance with the agreed details prior to the occupancy
of the first approved dwellinghouses.  Once provided, the footway shall thereafter be
permanently retained as such. 
Reason: Reason: In the interests of pedestrian safety and to extend the local
footway/cycle route network. 
11. Prior to the occupancy of the first dwellinghouse hereby approved, a 3m wide
footway/cycleway from Flemington Road into the site, with a 2m wide footway
connecting to the existing footway on Gilbertfield Road (approximately 20m east of
Claudius Crescent) shall be constructed.  Works to include design and provision of a
positive drainage system including a new drain through the Phase 2 development shall
be submitted for the written approval of the Planning Service in consultation with the
Roads Service prior to commencement of development.  Thereafter, the path shall be
implemented in full accordance with the agreed details prior to the occupancy of the
first approved dwellinghouses.  Once provided, the footway shall thereafter be
permanently retained as such. 
Reason: In the interests of pedestrian safety, to extend the local footway/cycle route
network and to alleviate the potential for on-site and off-site flooding. 
12. Prior to commencement of development, full details of the formation of the site access
road and extension of the footway link along Gilbertfield Road shall be submitted for
the written approval of the Planning Service in consultation with the Roads Service. 
Thereafter, the works shall be implemented in full accordance with the agreed details
prior to the occupancy of the first approved dwellinghouses.  Once provided, the works
shall thereafter be permanently retained as such. 
Reason: In the interests of pedestrian safety, to extend the local footway/cycle route
network and in the interests of road safety. 
13. Notwithstanding the development hereby approved prior to commencement of
development full details of a footway link along Lightburn Road shall be submitted for
the written approval of the Planning Service in consultation with the Roads Service. 
For the avoidance of doubt, unless otherwise agreed, the footway shall be a 2m wide
lit footway link constructed on Lightburn Road to connect with the existing footway on
Lightburn Road, at the western boundary of the site.  Thereafter, footway shall be
implemented in full accordance with the agreed details prior to the occupancy of the
first approved dwellinghouses.  Once provided, the works shall thereafter be
permanently retained as such. 
Reason: In the interests of sustainable travel, pedestrian and road public safety. 
14. Notwithstanding the requirements of Condition 13 above, an appropriate footway
network that will connect the new development with the existing footway on Lightburn
Road and Hamilton Road, to enable the retention of the mature hedgerow, shall be
implemented.  Full details of the footway design shall be submitted for the written
approval of the Planning Service in consultation with the Roads Service.  Thereafter,
the footway shall be implemented in full accordance with the agreed details prior to
the occupancy of the first approved dwellinghouses.  Once provided, the works shall
thereafter be permanently retained as such. 
155

Page 156

Reason: In the interests of sustainable travel, pedestrian and road public safety. 
15. Notwithstanding the terms of Conditions 8-13 inclusive, a positive drainage system
shall be required to be installed along these sections of carriageway on which the
footways are constructed.  Prior to the commencement of development full drainage
details shall be submitted for the written approval of the Planning Service in
consultation with the Roads Service.  Thereafter, the footway shall be implemented in
full accordance with the agreed details prior to the occupancy of the first approved
dwellinghouses.  Once provided, the works shall thereafter be permanently retained
as such. 
Reason: To encourage natural drainage and to avoid the potential for localised
flooding. 
16. For the avoidance of doubt, prior to the occupation of any dwelling house hereby
approved, the developer shall fund the upgrading of the street lighting along the
frontage of Gilbertfield Road and shall construct a continuous 2m wide footway link on
the previously reserved strip of land along the same Gilbertfield Road frontage of the
site from the existing Phase 1 development to the Phase 2 access road, all to the
satisfaction of the Council as Planning Authority. 
Reason: In the interest of public safety. 
17.  The proposed development shall be connected to the public water supply as indicated
in the submitted application and shall not be connected to a private water supply
without the separate express grant of planning permission by the planning authority. 
Reason: To ensure the long-term sustainability of the development and the safety and
welfare of the occupants and visitors to the site. 
18. Wastewater from the proposed development shall be disposed of via the public sewer
as indicated in the submitted application and shall not be disposed of via private means
without the separate express grant of planning permission by the planning authority. 
No works in connection with the development hereby approved shall commence
unless written confirmation from Scottish Water stating that the site can be
satisfactorily served by a sewerage scheme designed in accordance with Scottish
Water's standards has been submitted to and approved in writing by the Planning
Authority. 
Reason: To ensure the long-term sustainability of the development and the safety and
welfare of the occupants and visitors to the site. 
19. No works in connection with the development hereby approved shall commence
unless full details of the surface water drainage arrangements (including provision of
an updated flood risk assessment, drainage assessment and maintenance
responsibilities) have been submitted to and approved in writing by the Council as
Planning Authority.  Such drainage arrangements will require to comply with the
principles of sustainable urban drainage systems and with the Council's Sustainable
Drainage Design Criteria and requirements (Updated Appendices 1,2,3,4 & 5).  A
drawing showing the proposed SuDS scheme must be provided and the proposed
SuDS scheme shall be located out with the 1 in 200 year plus 30% culvert blockage
level of 58.10m AOD, in agreement and to the satisfaction of the Council as Planning
Authority in discussion with SEPA.  Thereafter, the surface water drainage
arrangements shall be implemented in full accordance with the agreed details and the
development shall not be occupied until the surface drainage works have been
156

Page 157

completed in accordance with the agreed details.  Once provided, the works shall
thereafter be permanently retained as such. 
Reason: To ensure that the disposal of surface water from the site is dealt with in a
safe and sustainable manner, to return it to the natural water cycle with minimal
adverse impact on people and the environment and to alleviate the potential for on-
site and off-site flooding, and to ensure the provision of a satisfactory SUDS pond and
to minimise any flood risk. 
20. Prior to the commencement of development, full details of a contemporary
trash/security screen at the culvert inlet on Hamilton Road shall be submitted for the
written approval of the Planning Service.  For the avoidance of doubt, this shall include
details of an inspection and maintenance regime in respect of the Hamilton Road
culvert and screen.  Thereafter, the works shall be implemented in full accordance with
the agreed details prior to the occupancy of the first approved dwellinghouses.  Once
provided, the works shall thereafter be permanently retained as such, and the culvert
and screen shall be inspected and maintained in accordance with the approved
management schedule to the satisfaction of the Council as Planning Authority. 
Reason: To minimise any flood risk in the area. 
21. Notwithstanding the development hereby approved, prior to the development being
brought into use, the approved scheme for the mitigation of noise shown in the
approved Noise Impact Assessment shall be implemented in full, and where
appropriate, shall be maintained in accordance with the approved scheme to the
satisfaction of the Council as Planning Authority. 
Reason: In the interests of protecting the residential amenities of the new
development. 
22. Notwithstanding the details hereby approved, acoustic fencing will be required to the
satisfaction of Environmental Services.  Prior to the commencement of development,
full details shall be submitted for the written approval by the Planning Service.  For the
avoidance of doubt the fencing shall ensure that between the house of 0800 and 200
the measured noise level emitted from the Engineering works (LAeq 1hour) shall not
exceed the pre-existing background noise level (LA90 (15 mins) by more than 4dB (A)
when measured in accordance with BS4142:2014 at buildings where people are likely
to be affected.  Between the houses of 2000 and 0800 the noise emitted from the
premises (LAeq (15 mins)) shall not exceed the pre-existing background noise level
(LA90 (15 mins) by more than 4dB (A) when measured in accordance with
BS4142:2014 at buildings where people are likely to be affected. 
Reason: In the interests of protecting the residential amenities of the new
development. 
23. No works in connection with the development hereby approved shall commence
unless a scheme of hard and soft landscaping works has been submitted to and
approved in writing by the planning authority.  Details of the scheme shall include: 
a) A tree survey in accordance with BS 5837:2012. 
b) Existing landscape features and vegetation to be retained. 
c) Protection measures for the landscape features to be retained. 
d) Existing and proposed finished levels. 
e) The location of new trees, shrubs, hedges, grassed areas and water features,
including enhanced planting for the hedgerow.
157

Page 158

f) A schedule of planting to comprise species, plant sizes and proposed numbers and
density. 
g) Details of any top-soiling or other treatment to the ground.
h) Sections and other necessary details of any mounding, earthworks and hard
landscaping.
i) The location, design and materials of all hard landscaping works including walls,
fences, gates, street furniture and play equipment. 
j) An indication of existing trees, shrubs and hedges to be removed. 
k) A programme for the implementation, completion and subsequent management of
the proposed landscaping, including any phasing. 
All soft and hard landscaping proposals shall be carried out in accordance with the
approved planting scheme and management programme shall be completed to the
satisfaction of the Council as Planning Authority during the first available planting
season following occupation of the buildings or completion of the development hereby
approved, whichever is the sooner.  Any planting which, within a period of 5 years from
the completion of the development, in the opinion of the planning authority is dying,
being severely damaged or becoming seriously diseased, shall be replaced by plants
of similar size and species to those originally required to be planted. 
Once provided, all hard landscaping works shall thereafter be permanently retained. 
Reason: To ensure the implementation and management of a satisfactory scheme of
landscaping which will help to integrate the proposed development into the local 
24.  Prior to the commencement of development, full details of the design and location of
all boundary treatments, including walls, fences and any retaining walls, enclosures,
screening and paving and hard surfacing materials to be erected or installed on the
site shall be submitted for the written approval of the Planning Service.  Thereafter,
the boundary treatments shall be erected in full accordance with the agreed details
prior to the occupancy of the first approved dwellinghouses.  Once provided, all
landscaping works shall thereafter be permanently retained. 
Reason: In the interests of visual amenity. 
25. That notwithstanding the provisions of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (or any such order revoking or re-
enacting that order), no gates, fences, walls or other means of enclosure shall be
erected between the front of the dwellinghouse and the adjoining road. 
Reason: In order to retain effective planning control in the interests of the visual
amenities of the area, to protect open space. 
26. That no development shall take place within the development site as outlined in red
on the approved plan until the developer has secured the implementation of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted by the applicant, agreed by the West of
Scotland Archaeology Service, and approved by the Planning Authority.  Thereafter
the developer shall ensure that the programme of archaeological works is fully
implemented and that all recording and recovery of archaeological resources within
the development site is undertaken to the satisfaction of the Planning Authority in
agreement with the West of Scotland Archaeology Service. 
Reason: To safeguard and allow any archaeological remains which may exist on the
site to be satisfactorily recorded. 
158

Page 159

27.  For the avoidance of doubt, no work or crossings of the high-pressure gas apparatus
shall be carried out on site unless detailed consultation has taken place with Scottish
Gas Networks.  SGN must be consulted on all works within 35 metres of the high-
pressure gas pipelines (Major Accident Hazard Pipelines), with the aim of ensuring the
pipeline and the integrity of the servitude or easement area are not compromised. 
Thereafter, works shall be carried out in accordance with the agreed position of
Scottish Gas Networks in consultation with the Planning Authority. 
Reason: In the interests of public safety. 
28. For the avoidance of doubt, no mechanical excavations shall take place above or
within 0.5m of the low-pressure gas system, within 0.5m of the medium pressure gas
system or within 3m of the intermediate pressure gas system, and that confirmation of
the position of the gas mains shall be undertaken by using hand dug trial holes. 
Reason: In the interests of public safety. 
29. Prior to development commencing on site, a scheme for the control and mitigation of
dust shall be submitted to and approved in writing by the Council as Planning Authority. 
No changes to the approved scheme shall take place unless agreed in writing by the
Council as Planning Authority.  The scheme shall thereafter be implemented in
accordance with a programme to be agreed in writing with the Council as Planning
Authority. 
Reason: In the interests of amenity. 
159

Page 160

160

Page 161

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/22/0674
Installation of battery storage facility (S36 Scottish Government
Consultation) 
1 Summary application information
Amended
•  Application type:  Electricity notification S36 application
•  
Applicant:  Alcemi Storage Developments 4 Limited 
•  Location:  Land 700M North of Birkhill Mill
Cairnhouses Road
Douglas
Lanark
South Lanarkshire
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Scottish Government is informed that South Lanarkshire Council has
no objection to the proposed installation of a battery storage facility under
Section 36 of the Electricity Act 1989; and
(2) that the Head of Planning and Regulatory Services be authorised to undertake
any discussions and further agreements of conditions if required, with the
Scottish Government.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
3 Other information
♦ Applicant’s Agent: Jonathan Smith, RPS
♦ Council Area/Ward: 04 Clydesdale South
♦ Policy Reference(s): South Lanarkshire Local Development Plan 2
(Adopted 2021)
Policy 1 Spatial Strategy
Policy 2 Climate Change
Policy 4 Green Belt and Rural Area
Policy 5 Development Management and
Placemaking
Policy 14 Natural and Historic Environment
Policy 15 Travel and Transport
12
161

Page 162

Policy 16 Water Environment and Flooding 
Policy 18 Renewable Energy
Policy RE1 Renewable Energy
Policy DM1 New Development Design
Policy SDCC2 Flood Risk
Policy SDCC3 Sustainable Drainage Systems 
♦   Representation(s): 
► 0 Objection Letters
► 0  Support Letters
► 0  Comment Letters 
♦   Consultation(s):   
Environmental Services 
Roads Development Management Team 
Roads Flood Risk Management 
Countryside and Greenspace 
West of Scotland Archaeology Service (WOSAS) 
162

Page 163

Planning Application Report
1 Application Site
1.1 The application site is an area of approximately 16.4 hectares of land west of the M74
some 2.5km southeast of the settlement of Lesmahagow.  It also lies 1.4km southeast
of Coalburn Electricity Substation.  The eastern boundary of the site comprises the
M74, with the B7078 (Carlisle Road) forming the western boundary of the site.  To the
north of the site is open grassland with the nearest residential property some 160m
further north of the boundary.  The southern boundary comprises further open
grassland and then an existing animal feed business. 
1.2 The site is open agricultural land and is designated as Rural within the adopted South
Lanarkshire Local Development Plan 2 (SLLDP2).  To the immediate west of the site,
across the B7078 is the Coalburn Moss Special Area of Conservation (SAC) and Site
of Special Scientific Interest (SSSI). 
2 Proposal(s)
2.1 An application has been made to the Scottish Government under Section 36 of the
Electricity Act 1989 for the installation of a battery storage facility which involves the
creation of up to 5 platforms (each 5,610 metres sq) to house the batteries.  Each
platform would have a building to house the batteries which would be up to 15m in
height.  The proposals also include the following associated components:- 
 The creation of a new access from the B7078
 Security fencing and CCTV
 heating, ventilation, and air conditioning (HVAC) equipment
 fire suppression equipment
 cooling plant - control and protection apparatus
 switchgear apparatus
 inverters or power conversion systems
 transformers
 metering equipment
 associated transmission cabling
 welfare facilities 
2.2 The proposals are to allow for the storage of energy at times when generating stations
are working at full capacity which can then be released when additional power is
needed within the grid during peak times or when energy generation has dropped.  As
more energy sources are now renewable, such as wind and solar, balancing
generation versus demand is a critical issue for grid stability.  Battery storage allows
energy to be stored during peak renewable generation periods and released when
demand outstrips generation.  In short, the proposed battery takes in generated
electricity when there is a surplus and stores it until there is a demand for electricity
which can be released to meet this demand.  The proposed batteries would be fed
from and transmit back to the adjacent substation via underground cabling. 
2.3 It should be noted that the energy stored within the batteries will be from all available
sources.  However, renewable energy production has the most variable rates of output
and therefore whilst the electricity transmitted to the batteries may not solely be
renewable, it’s storage and subsequent release when needed is considered to meet
the need for grid stability due to the further reliance on renewable energy.  It is
therefore considered that in essence the battery storage can be classed as renewable
electricity infrastructure given the increased need for grid stability as renewable energy
generation increases.  As more traditional energy sources such as coal and gas are
163

Page 164

being decommissioned and renewable energy sources are replacing them, balancing
generation versus demand is becoming more critical due to the more sporadic nature
of renewable energy development.  Grid stability is therefore essential as the transition
to renewable energy continues and battery storage is therefore considered an
essential part of this need for ongoing grid stability. 
2.4 The proposed storage capacity of the batteries is up to 500MW and is therefore of a
scale (over 50MW) that requires consent through the Electricity Act with the Scottish
Government as the Consenting Authority.  In this instance, the Council is therefore a
Consultee to the application process and not the Consenting Authority. 
3 Background
3.1 National Policy
3.1.1 National Planning Framework 3 (NPF3) June 2014 sets out the long-term vision for
the development of Scotland and is the spatial expression of the Scottish
Government’s Economic Strategy.  It has a focus on supporting sustainable economic
growth which respects the quality of the environment, place and life in Scotland and
the transition to a low carbon economy.  The framework sets out strategic outcomes
aimed at supporting the vision – a successful, sustainable place, a low carbon place,
a natural, resilient place and a connected place.  NPF3 also notes in paragraph 3.8
“We want to meet at least 30% of overall energy demand from renewables by 2020”. 
3.1.2 Scottish Planning Policy (SPP) June 2014 aligns itself with NPF3 and one of its policy
principles states that “this SPP introduces a presumption in favour of development that
contributes to sustainable development”.  At paragraph 28, SPP states that “the
planning system should support economically, environmentally and socially
sustainable places by enabling development that balances the costs and benefits of a
proposal over the longer term.  The aim is to achieve the right development in the right
place; it is not to allow development at any cost.”  The SPP also identifies a number of
considerations to be taken into account when determining energy infrastructure
developments including net economic benefit, the contribution to renewable energy
targets, cumulative impacts, visual impacts, residential amenity, and landscape and
visual impacts (paragraph169). 
3.1.3 As noted in 2.3 above, the proposals would aid grid stability as renewable energy
generation increases.  It is therefore considered that, subject to the detailed
assessment against the Development Plan criteria as set out in Section 6 below, the
principle of the development accords with National Policy. 
3.2 Development Plan Status
3.2.1 The proposed development requires to be considered against the approved Glasgow
and Clyde Valley Strategic Development Plan 2017 (GCVSDP).  The GCVSDP is a
high level, strategic document and it is considered that proposals of this scale would
not have any strategic implications within the Strategic Development Plan Area.  As
such there is no detailed assessment of the proposals against this strategic Plan. 
3.2.2 Following formal adoption on 9 April 2021, the proposals are required to be assessed
against the South Lanarkshire Local Development Plan 2 (SLLDP2). 
In this regard, the application site and associated proposal is affected by the following
policies contained in SLLDP2:- 
Volume 1
1. Policy 1 Spatial Strategy
2. Policy 2 Climate Change
164

Page 165

3. Policy 4 Green Belt and Rural Area
4. Policy 14 Natural and Historic Environment
5. Policy 15 Travel and Transport
6. Policy 16 Water Environment and Flooding
7. Policy 18 Renewable Energy 
Volume 2 
1. Policy SDCC2 Flood Risk
2. Policy SDCC3 Sustainable Drainage Systems
3. Policy DM1 New Development Design
4. Policy RE1 Renewable Energy 
3.3 Planning Background
3.3.1 On 27 August 2020, the Scottish Government’s Chief Planner issued a letter in relation
to electricity storage and the consenting regime.  In this letter the Chief Planner stated
that the Scottish Government considers that a battery installation generates electricity
and is therefore to be treated as a generating station. 
3.3.2 In light of this statement and as noted in 2.4 above, the proposals fall within the scope
of the Electricity Act 1989 and as such the Council is a consultee to the application
rather than the Consenting Authority. 
3.3.3 Whilst the application site is currently open farmland it and a wider area to the south
has several extant planning permissions as set out below. 
3.3.4 Outline planning consent (CL/02/0693) was granted in November 2003 for the
development of the site for general industrial (Class 5) and storage/distribution
purposes (Class 6).  The animal feed business was the subject of a subsequent
reserved matters approval and it has been implemented and is operational.  A
reserved matters application (CL/04/0873) was granted in 2005 for the remainder of
the undeveloped land, and this consisted of the formation of accesses and structural
landscaping.  A further reserved matters application (CL/08/0022) was granted
consent in February 2009 for the erection of 14 industrial units with ancillary office
space (Class 5 general industry and Class 6 storage or distribution) with associated
car parking and infrastructure.  In November 2011 planning permission was granted
for the erection of a bio-gas production facility on a large portion of the current
application site.  Whilst some preparation works on site have been carried out in
relation to this permission they have not been deemed adequate in terms of securing
the planning permission and these permissions have now lapsed. 
3.3.5 Planning permission was granted in 2016 for two, 98.14 metre high wind turbines
within the site (Ref: CL/16/0090) and this application was granted for a further 3 years
in January 2020 (Ref: P/19/0363).  The consent has not been implemented however
it is still live. 
3.3.6 In April 2020, Planning Committee granted planning permission in principle for the
Erection of data centre (Class 4 Business) and associated 12MW Solar farm and
7.5MW gas turbine with light industrial (Class 5) area and associated infrastructure. 
In September 2021 a hydrogen facility was granted through a matter specified by
condition application via this planning permission in principle.  A new access off the
B7078 for the Hydrogen facility was granted planning permission (P/21/0438) in
August 2021.  An application for matters specified by condition of the solar panel
element of this planning permission in principle has been submitted (P/21/2200) and
is currently pending consideration.
165

Page 166

3.3.7 It should be noted that whilst the applications referenced in 3.3.6 above are extant,
they have not yet been implemented on site. 
4 Consultation(s)
4.1 Roads Development Management – have no objections to the proposals subject to
conditions relating to the following:-
 Site access including design and drainage
 An Abnormal Load Route Assessment for delivery of the specialist components
of the proposals
 A Traffic Management Plan for the construction period
 A Roads Dilapidation Survey prior to commencement 
Response:  Noted.  Appropriate conditions form part of the recommended
consultation response to the Scottish Government. 
4.2  Environmental Services – no objections to the proposals subject to a condition
setting noise limits on the proposals. 
Response: Noted.  An appropriate condition forms part of the recommended
consultation response to the Scottish Government. 
4.3 Countryside and Greenspace – no objections to the proposals.   
Response: Noted.   
4.4 West of Scotland Archaeological Service (WoSAS) – note that there has been
previous archaeological investigations within the application site that did not uncover
anything of archaeological interest and therefore do not recommend the need for
further archaeological work. 
Response: Noted. 
4.5 The following consultees had no comments to make on the proposals:-  
 Roads Flood Risk Management 
5 Representation(s)
5.1 Statutory advertisement of the application was undertaken by the applicant in April
2022.  No representations have been made to the Council following this advertisement. 
6 Assessment and Conclusions
6.1 This application has been submitted to the Scottish Government under Section 36 of
the Electricity Act 1989 as it is development with a generating capacity of over 50MW.
In this instance South Lanarkshire Council is a consultee to the application process
and is not the Consenting Authority.  Under the terms of Section 25 of the Town and
Country Planning (Scotland) Act 1997 all applications must be determined in
accordance with the development plan unless material considerations indicate
otherwise.  In this instance the application is made under the Electricity Act 1989 and
not the Planning Act and therefore the Development Plan does not have the primacy
it normally would for planning decisions, but it is still an important material
consideration in this instance and informs the Council’s consultation response. 
6.2 The approved Glasgow and the Clyde Valley Strategic Development Plan 2017
(GCVSDP) and the adopted South Lanarkshire Local Development Plan 2 (SLLDP2).
166

Page 167

As noted in 3.2.1 above, it is considered that the GCVSDP is a strategic, high-level
document and an application of this scale and nature does not raise any strategic
implications.  Therefore, no further assessment against this document is required. 
6.3 SLLDP2 Policy 1 ‘Spatial Strategy’ states that developments that accord with the
policies and proposals of the development plan will be supported.  The application site
is on land designated as Rural within the SLLDP2, therefore Policy 4: Green Belt and
Rural Area is of relevance.  This policy states that the Rural Area functions primarily
for agriculture and other uses appropriate to the countryside.  Isolated and sporadic
development will not be appropriate.  Policy GBRA2 provides a list of uses that are
suitable in the Rural Area including renewable energy proposals.  In addition, the site
is adjacent to an area that has extant planning permissions for similar development
(as set out within 3.3 above) and is not therefore considered isolated.  It is also within
close proximity of Coalburn Substation and within an area that has several large scale
wind farms within the locale which therefore allows the minimum amount of
transmission infrastructure to be required to connect the battery proposals to the
national grid.  It is therefore considered that the proposals accord with the relevant
criteria and provisions of SLLDP2 in this regard. 
6.4 Policy 2 ‘Climate Change’ of the SLLDP2 states that proposals for new development
must, where possible, seek to minimise and mitigate against the effects of climate
change.  As noted in 2.3 above, whilst the electricity transmitted for storage within the
proposed batteries will have come from a mixture of renewable and non-renewable
sources the purpose of the batteries is to ensure there is always grid stability.  As
renewable energy becomes more prevalent, grid stability becomes a significant issue
due to the intermittent nature of renewable energy generation.  As such it is considered
that the batteries purpose is intrinsically linked to renewable energy generation and
therefore can be viewed as renewable infrastructure to support increased renewable
energy generation.  Therefore, the proposals are considered to be in accordance with
the aims of this Policy. 
6.5  Policy 5 ‘Development Management and Placemaking’ states that development
proposals should take account of and be integrated within the local context and built
form.  New development should also have no significant adverse impacts on the local
community.  This advice is supported within SLLDP2 Policy DM1 ‘New Development
Design.  Due to battery technology constantly evolving a finalised design for the
proposals has not been set but the Environmental Impact Assessment Report (EIAR)
has been drawn up based on the largest design parameters envisaged and therefore
any subsequent changes would be scaled down and thus reduce the proposals impact.
The design proposed is functional in form and involves the siting of up to 5 platforms
(each 5,610 metres sq) to house the batteries.  Each platform would have a building
to house the batteries which would be up to 15m in height.  It is considered that the
scale of the proposals is similar to the hydrogen facility that has planning permission
immediately adjacent to the site and the existing animal feed factory further south from
the site.  This results in the proposals being in keeping with the character of the
immediate area and would not dominate the surrounding landscape.  A functional
battery building would not detract from the amenity of the area and would be read as
essential electricity infrastructure similar to the Coalburn Substation to northwest of
the site.  Screen planting is also proposed to further soften the proposals visual impact.
It is therefore considered that the design of the proposals would not be detrimental to
the surrounding area and any visual impact is minimised by the site’s location being
clustered next to the substation.   
167

Page 168

6.6 In terms of the impact the proposals would have on the amenity of the area, including
air quality, it is noted that the proposals would not emit any gases as part of the process
and are in essence similar in nature to electricity substations.  Environmental Services
have reviewed the Noise Impact Assessment (NIA) submitted as part of the planning
application and are satisfied with the conclusions of the NIA.  The site is located in a
rural area and there are no immediate neighbouring, residential properties.  It is,
therefore, considered that the proposals accord with the relevant criteria of this policy. 
6.7 Policy 14: Natural and Historic Environment provides the context for assessing all
development proposals in terms of their effect on the character and amenity of the
natural and built environment.  The site is not located in proximity to any listed building,
Conservation Area or other historical asset that would be impacted upon by the
proposals.  Protected species surveys were undertaken and the results were included
within the EIAR.  No evidence of protected species was found within the site but it was
noted that there was potential for some protected species to use habitat within the
area surrounding the application site.  The application site is within close proximity to
the Coalburn Moss SAC and SSSI, which is designated for its active raised bogs and
degraded raised bogs which are still capable of natural regeneration, however, there
is separation by the B7078.  It is considered that the proposals would not have any
impact on this asset.  In their response direct to the Scottish Government, NatureScot
have no objections to the proposals subject to conditions ensuring the Coalburn Moss
SAC water table is not affected by the proposals.  It is, therefore, considered that the
proposals accord with the relevant criteria of this policy. 
6.8 SLLDP2 Policy 15 ‘Travel and Transport’ requires that new development does not
impact upon any existing walking or cycle route and promotes sustainable travel,
where at all possible. In this instance there are no walking or cycling routes affected
by the proposals.  Due to the site’s location within the countryside it is not accessible
via public transport but as noted above, the location of the proposals adjacent to an
existing substation minimise the electricity transmission infrastructure needed to
connect to the grid which, given the low level of traffic to the site due to remote
monitoring, is considered more sustainable than access to public transport in this
instance. Roads (Development Management) have no objection to the proposals
subject to the conditions outlined in 4.1 above. 
6.9 SLLDP2 Policy 16 ‘Water Environment and Flooding’ states that development
proposals within areas of flood risk or that are detrimental to the water environment
will not be supported.  Policies SDCC2 Flood Risk and SDCC3 Sustainable Drainage
Systems provide further detailed advice in support of Policy 16.  The application site
is not located within any area at risk from river, surface or coastal flooding.  A Flood
Risk Assessment (FRA) has been submitted as part of the EIA Report which notes
that the site is not mapped as at a risk of flooding.  Sustainable drainage is proposed
for dealing with surface water and it is considered that this is acceptable subject to the
design meeting the Council’s drainage design criteria.  It is also noted that SEPA, when
responding directly to the Scottish Government, have no objections to the proposals.
A Sustainable Drainage System is proposed for the site.  It is therefore considered that
the proposals accord with the relevant provisions of the development plan. 
6.10 SLLDP2 Policy 18 ‘Renewable Energy’ is an overarching renewable energy policy and,
therefore, defers the detailed, development management consideration to the
Assessment Checklist for Renewable Energy Proposals contained within SLLDP2
Volume 2. Volume 2 Policy RE1 Renewable Energy outlines the considerations,
criteria and guidance that must be taken into account for all renewable energy
proposals.  These are the Assessment Checklist contained with Appendix 1 of
SLLDP2, Volume 2, the Supporting Planning Guidance on Renewable Energy, the
168

Page 169

South Lanarkshire Landscape Capacity for Wind Energy 2016 (as amended by the
Tall Wind Turbines Guidance 2019) and other relevant SLLDP2 Policies.  It is noted
that the majority of this guidance relates to wind turbines and it is considered that the
relevant, remaining development management criteria have already been assessed
throughout the above policy criteria assessment. 
6.11 In conclusion, it is considered that the proposed development complies with the
adopted South Lanarkshire Local Development Plan 2 and, therefore, it is
recommended that the Scottish Government be notified that the Council has no
objections to the application subject to the conditions as set out within the paper apart. 
7 Reasons for Decision
7.1 The proposed development complies with Policies 1,2, 4, 5, 14, 15, 16, 18, SDCC2,
SDCC3, RE1 and DM1 of the Adopted South Lanarkshire Local Development Plan 2
(2021). 
David Booth
Executive Director (Community and Enterprise Resources) 
29 September 2022 
Previous references
 CL/02/0693
 CL/04/0873
 CL/08/0022
 CL/16/0090
 P/19/0363
 P/21/0320
 P/21/0438 
List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021) 
► Consultations
Environmental Services 16.08.2022
Roads Development Management Team 24.08.2022
West Of Scotland Archaeology Service 13.06.2022
Countryside And Greenspace 14.06.2022     
Contact for further information
If you would like to inspect the background papers or want further information, please
contact: - 
James Wright, Planning Officer, Council Offices, Floor 6, Almada Street, Hamilton, ML3
0AA
Phone: 07551 839 698   
Email: james.wright@southlanarkshire.gov.uk
169

Page 170

Detailed planning application 
Paper apart – Application number: P/22/0674 
Conditions and reasons 
01. That prior to works commencing on site the applicant shall submit, for written approval
of South Lanarkshire Council, detailed proposals covering the site access onto the
B7078 Carlisle Road including junction visibility splays, road markings and signage all
designed in accordance with the Design Manual for Roads and Bridges.  The design
shall include crossing details over the existing National Cycle Network NCN74.  The
design shall be supported by a Stage 2 Road Safety Audit together with the Designer's
Response.  The applicant shall demonstrate that they have all rights to implement and
maintain the visibility splay where it traverses third party land.  That once approved in
writing, the site access shall be constructed and thereafter maintained in accordance
with the agreed plans and specification to the satisfaction of the South Lanarkshire
Council.  FOR THE AVOIDANCE OF DOUBT the access shall be constructed in such
a way as to prevent any surface water or deleterious material from running onto or
entering the B7078 Carlisle Road and be maintained as such for the lifetime of the
development hereby approved.   
Reason: In the interests of road safety 
02. That prior to commencement of works on site the applicant shall submit, for the written
approval of South Lanarkshire Council's Bridges & Structures Team Roads Authority,
an Abnormal Load Route Assessment (ALRA) for delivery of specialist components
which should detail any modifications to the Council's local road network associated
with the ALRA.   
Reason: In the interests of road safety 
03. That no development shall commence until a construction phase Traffic Management
Plan (TMP) has been submitted for the written approval of South Lanarkshire Council. 
The plan shall include details of the following and once approved all construction works
shall be undertaken in accordance with the approved TMP:- 
a. The routeing of all traffic associated with each phase of the development via
Junction 11 of the M74 at Poniel. 
b. Measures to ensure that the specified routes are adhered to by all operatives and
suppliers, including monitoring procedures; 
c. Details of all temporary construction direction signage; 
d. Provisions for emergency vehicle access; 
e. Wheel washing facilities to provide detritus being deposited on the public road; 
f. Site staff car parking as no parking is permitted on the public road 
g. Delivery and laydown space; 
h. Identification of a nominated person to whom any road safety issues can be referred.   
Reason: In the interests of road safety 
04. That prior to works commencing on site the developer shall undertake a roads
dilapidation survey in conjunction with South Lanarkshire Council Roads Area Office
covering the B7078 Carlisle Road for 50metres either side of the proposed site access. 
Interim and final surveys shall be undertaken as directed by the Roads Area Office. 
Each inspection shall be recorded in a report to include photographs, plans and
description of road condition, and be submitted for record purposes within timescales
170

Page 171

determined by South Lanarkshire Council.  The Applicant shall be responsible for
repairing damage attributable to their operations and undertake all necessary repairs
within timescales stipulated by South Lanarkshire Council.   
Reason: In the interests of road safety 
05. The following noise levels shall not be exceeded resultant from and specific to the
development:-   
Part 1 
Between the hours of 08:00 and 20:00 the measured noise rating level emitted from
the premises (LAr,1hr) shall not exceed the pre-existing background noise level
(LA90,30 min) by more than 4dB when measured in accordance with British Standard
BS 4142:2014 - Method for Rating and Assessing Industrial and Commercial Sound
at buildings where people are likely to be affected.  Between the hours of 20:00 and
08:00 the noise rating level emitted from the premises (LAr,15min) shall not exceed
the pre-existing background noise level (LA90,30min) by more than 4dB when
measured in accordance with BS4142:2014 at buildings where people are likely to be
affected.   
Part 2 
The internal noise levels within any residential property and resultant from the
development shall comply with BS 8233:2014 Guidance on sound insulation and noise
reduction for buildings as follows- 
a) The internal levels with windows open do not exceed an LAeq,16hr of 40dB daytime 
(07:00 - 23:00) 
b) The internal levels with windows open do not exceed an LAeq,8hr of 30dB night-
time 
(23:00 - 07:00). 
c) The internal levels with windows open do not exceed an LAmax of 45dB night-time 
(23:00 - 07:00). 
d) The external levels shall not exceed an LAeq,16hr of 50dB daytime in any garden
amenity areas, when measured free-field   
Part 3 
The Internal Noise Rating Values, within any residential property and resultant from
the neighbourhood (industrial and commercial) and neighbour noise (installed
services), shall not exceed- 
o NR25 between 23.00hrs and 08.00hrs 
o NR35 between 08.00hrs and 23.00hrs   
Reason: In the interests of residential amenity 
06. That before the development, hereby approved, is brought into use details of
landscaping and screen planting, including ongoing maintenance, shall be submitted
for the written approval of the Council, as Planning Authority.  Once approved the
landscaping and planting will be implemented as approved and maintained as such
for the lifetime of the development hereby approved.   
Reason: In the interest of visual amenity. 
07. That all works on site should comply with appendices 1, 3 and 5 from the Council's
drainage design guidance.   
Reason: In the interests of drainage and flooding
171

Page 172

172

Page 173

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/22/0699
Change of use of office accommodation in north stand to assisted
accommodation 
1 Summary application information
Amended
•  Application type:  Detailed planning application
•  
Applicant:  The Stadium Company Limited 
•  Location:  New Douglas Park
Cadzow Avenue
Hamilton
ML3 0FT 
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) Grant detailed planning permission.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
3 Other information
♦ Applicant’s Agent: John Glenroy
♦ Council Area/Ward: 17 Hamilton North and East
♦ Policy Reference(s): South Lanarkshire Local Development Plan 2
(adopted 2021)
Policy 1 - Spatial Strategy
Policy 2 - Climate Change
Policy 3 - General Urban Areas and Settlements
Policy 5 - Development Management and
Placemaking
Policy 15 - Travel and Transport 
13
173

Page 174

♦   Representation(s): 
► 4  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
♦   Consultation(s):   
Roads Development Management Team 
Environmental Services 
Care Inspectorate 
Lanarkshire Health Board 
Social Work Resources Registration and Inspection Unit 
174

Page 175

Planning Application Report
1 Application Site
1.1 The application relates to existing office space within the north stand of Hamilton
Academical’s football stadium at New Douglas Park to the north of Hamilton town
centre.  The application site is bounded to the north and west by car parking and
Cadzow Avenue, to the south by the stadium’s football pitch and to the east by land
associated with the stadium and the adjacent Morrison’s retail store and car park. 
Access to the site is via Cadzow Avenue. 
2. Proposal(s)
2.1 The applicant seeks detailed planning permission for a change of use of existing office
accommodation in the north stand of Hamilton Academical’s football stadium to
assisted living accommodation.  The submitted supporting information entitled ‘A
Recovery and Wellbeing Village’ outlines the overall vision for a Recovery and
Wellbeing Village located within the stadium which would be anchored around a 20
bed rehabilitation and recovery centre in the north stand in addition to 20 supported
transition flats in the stadium grounds.  It is only the proposed 20 bed rehabilitation
and recovery centre that relates to this planning application which would include 20
bedrooms with 10 additional rooms along with day rooms, therapy rooms, cinema
rooms and toilets. 
2.2 The supporting statement advises that the stadium has 23,600 square feet of space in
the north stand which was previously rented for office space and has spare land in the
stadium grounds.  The space for developing the Recovery and Wellbeing Village is
available within an existing wellbeing focused environment which would be staffed 24
hours a day, 365 days a year by registered experienced support and recovery workers. 
No changes are proposed to road layouts or car parking spaces as a result of this
application.  A summary of parking provision requirements relating to the proposed
change of use has been submitted which seeks to demonstrate that the proposed
change of use is less onerous than the previous use in terms of car parking
requirements. 
3. Background 
3.1 Local Plan Background
3.1.1 The application site is located within the General Urban Area in the adopted South
Lanarkshire Local Development Plan 2.  The relevant policies in terms of the
assessment of this application are Policy 1 - Spatial Strategy, Policy 2 - Climate
Change, Policy 3 - General Urban Areas and Settlements, Policy 5 - Development
Management and Place Making and Policy 15 - Travel and Transport.  The content of
the above policies and how they relate to the proposal is assessed in detail in Section
6 of this report. 
3.2 Relevant Government Advice/Policy
3.2.1 None relevant in this instance. 
3.3 Planning Background
3.3.1 There is no recent planning history relating to the application site. 
4. Consultation(s) 
4.1 Care Inspectorate - they were contacted many months ago by the applicant regarding
this proposal to register a Housing Support/Care at Home service within this area. 
Due to the nature of the services proposed, they would not inspect any
accommodation nor do they have accommodation standards or expectations for a
Housing Support/Care at Home service. 
175

Page 176

Response:-  Noted. 
4.2 Environmental Services – have no objections to the application.
Response:-  Noted. 
4.3 Roads Development Management Team – have no objections to the application.
The applicant submitted a parking statement for the development.  With 20 bedrooms
and 10 members of staff, a total of 17 parking spaces would be required (1 per staff
member plus 1 per 3 bedrooms) this is compared to its previous use as a 1,370sqm
office which would have required 46 spaces (1 per 30sqm).  On this basis the
proposals are less onerous in terms of parking requirements and are, therefore,
acceptable.
Response:-  Noted. 
4.4 Social Work Resources – representatives from the Health and Social Care
Partnership (HSCP) and Social Work Resources have met with the applicant to
consider the proposal.  There are no objections to the proposal which is broadly
consistent with Scottish Government Policy and the objectives of both the Integrated
Joint Board’s Strategic Commissioning Plan and the Alcohol and Drugs Partnership
Strategy.  The applicant has advised that the service is intended to be predominately
targeted at Lanarkshire residents.  The applicant is at the early stages of developing
the proposal to a stage where it can be operationalised and agrees the need to co-
produce the delivery model with primary care services NHS Lanarkshire and HSCP
clinical services, social work, and housing teams.
Response:-  Noted. 
4.5 Lanarkshire Health Board – as above, representatives from the Health and Social
Care Partnership (HSCP) and Social Work Resources have met with the applicant to
consider the proposal.  There are no objections to the proposal which is broadly
consistent with Scottish Government Policy and the objectives of both the Integrated
Joint Board’s Strategic Commissioning Plan and the Alcohol and Drugs Partnership
Strategy.  The applicant has advised that the service is intended to be predominately
targeted at Lanarkshire residents.  The applicant is at the early stages of developing
the proposal to a stage where it can be operationalised and agrees the need to co-
produce the delivery model with primary care services NHS Lanarkshire and HSCP
clinical services, social work, and housing teams.
Response:-  Noted. 
5. Representation(s)
5.1 Statutory neighbour notification procedures were undertaken and the application was
advertised under the heading Non-Notification of Neighbours in the Hamilton
Advertiser.  Four letters of objection were received in relation to the application. The
grounds of objection are summarised as follows:- 
(a) The nature of this proposed care facility raises concerns over security in
the area, not simply on match days but at all times of the day and evening. 
While the need for such a facility exists, this is not the appropriate
location.  Hamilton Accies claim to be a family friendly club, however, this
application shows little regard for a family's safety and security while
attending the stadium for a match or otherwise, as it will be certain to
draw attention from people who are suffering from addictions.  Research
proves that such areas suffer from higher rates of crime, this leads me to
the belief that the residential areas in the immediate vicinity will also
suffer from a rise in crime and anti-social behaviour. 
176

Page 177

Response: These concerns do not constitute material planning considerations
in the assessment of this planning application.  As highlighted in Section 4
above, no adverse comments have been raised by any of the consultees in
relation to the proposed use of the building and any increase in crime or anti-
social behaviour in the area would be matters for Police Scotland to address. 
(b) While no one will question the need for such a facility existing given the
national statistics on drug, alcohol and suicide deaths in Scotland and
particularly in the Lanarkshire area, it is my feeling that this location is
not appropriate for this facility.  The applicant has little regard for the
safety of the community round the stadium that consists of a pre-5
nursery (within the same complex) primary and secondary school as well
as local green space and public parks.  Hamilton Academical has to be
applauded for the work they do within the community, particularly with
those who suffer from addictions.  Their efforts and experience in helping
this client group would be better spent working in partnership with others
to campaign for more appropriate treatment and rehabilitation.
Response: As above, these concerns do not constitute material planning
considerations in the assessment of this planning application. 
(c) Hamilton Academical are first and foremost a football club and I question
the experience and skill set of the management to oversee and manage a
facility of this nature.  The conversion of a football stand into rooms does
not outlay dignity to those going through the addiction journey and will
create more problems than it will solve for the community, the client
group and Hamilton Academical FC.
Response: Again, these concerns do not constitute material planning
considerations in the assessment of this planning application.  As highlighted in
Section 4 above, no adverse comments have been raised by any of the
consultees in relation to the proposed use of the building.   
5.2 These letters are available for inspection on the planning portal. 
6. Assessment and Conclusions
6.1 The applicant seeks detailed planning permission for a change of use of existing office
accommodation in the north stand, to assisted accommodation.  The determining
issues in consideration of this application are its compliance with local plan policy and
its impact on the amenity of adjacent properties and on the local road network. 
6.2 In terms of local plan policy, the application site is located within the General Urban
Area in the adopted South Lanarkshire Local Development Plan 2.  The relevant
policies in terms of the assessment of this application are Policy 1 - Spatial Strategy,
Policy 2 - Climate Change, Policy 3 - General Urban Areas and Settlements, Policy 5
- Development Management and Place Making and Policy 15 - Travel and Transport. 
6.3 Policies 1 and 2 encourage sustainable economic growth and regeneration, a move
towards a low carbon economy, the protection of the natural and historic environment
and mitigation against the impacts of climate change.  In line with these policies, the
proposal involves a change of use of an existing facility which is located in a
sustainable location within central Hamilton.  The site benefits from opportunities for
trips by public transport with bus routes in the surrounding area and Hamilton West
train station, which is located within close proximity of the site. It is considered that the
proposal conforms with Policies 1 and 2. 
177

Page 178

6.4 Policy 3 states that within the urban areas and settlements identified on the proposals
map, residential developments on appropriate sites will generally be acceptable. 
Proposals for uses that are ancillary to residential areas will be assessed on their
individual merits, with particular regard to their effect on the amenity and character of
the area.  The policy goes on to say that developments which would be detrimental to
the amenity of residents and the wider community or to the character of the
surrounding area will not be permitted.  This particularly applies to 'bad neighbour'
uses which can affect neighbours by virtue of visual impact, noise, smell, air pollution,
disturbance, traffic or public safety.  In this instance, the application site is located
within the General Urban Area and the proposal is not considered to be detrimental to
the amenity of nearby residents and the wider community.  Therefore, it is considered
that the proposal conforms with the terms of Policy 3. 
6.5 Policies 5 and DM1 generally require new development to have due regard to the
layout, form, design and local context of the area and to promote quality and
sustainability in its design.  In this instance, the application only relates to a change of
use from existing office accommodation within the stadium’s North Stand.  Whilst
alterations are proposed for the interior of the building, no alterations are proposed for
the exterior of the building.  In this regard, it is considered that the proposal conforms
with Policies 5 and DM1. 
6.6 Policy 15 seeks to ensure that development considers, and where appropriate,
mitigates the resulting impacts of traffic growth and encourages sustainable transport
options that take account of the need to provide proper provision for walking, cycling
and public transport.  In relation to this policy, Roads and Transportation Services are
satisfied that the proposal raises no access, parking or road safety issues.  It is,
therefore, considered that the proposal complies with Policy 15. 
6.7 In summary, statutory consultees have raised no concerns in relation to the proposal
and the matters which have been raised in the representations submitted have been
addressed in Section 5 above.  Under the terms of Section 25 of the Town and Country
Planning (Scotland) Act 1997, all applications must be determined in accordance with
the development plan unless material considerations indicate otherwise.  The
concerns raised in the submitted representations do not constitute material planning
considerations in the assessment of this planning application.  It is considered that the
application conforms with local plan policy and that the proposal raises no significant
environmental or infrastructure issues.  It is, therefore, recommended that the
application for the change of use be granted. 
7. Reasons for Decision
7.1 The proposal raises no significant amenity, environmental or infrastructure issues and
complies with Policies 1, 2, 3, 5 and 15 of the adopted South Lanarkshire Local
Development Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 29 September 2022 
Previous references
 None 
178

Page 179

List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter dated 16.05.2022
► Press Advertisement, Hamilton Advertiser 26.05.2022 
► Consultations
Roads Development Management Team 06.09.2022
Environmental Services 13.07.2022
Care Inspectorate 23.05.2022
Lanarkshire Health Board 22.09.2022
Social Work Resources Registration and Inspection Unit 22.09.2022 
► Representations           Dated:
Mr Alan MacDonald, 2 Riverside Road, Larkhall, ML9  18.05.2022 
Mr Joseph McCabe, 10 Keswick Drive, Hamilton, ML3 7HN  18.05.2022 
Mr Paul Murray, 32 Deveron Crescent, Hamilton, Hamilton,
ML3 9PB 
18.05.2022 
Mr Peter McGhee, 6, Hunter Road, Whitehill, Hunter Road,
Hamilton, ML3 0LH 
31.05.2022 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Jim Blake, Planning Officer, Floor 6, Council Offices, Almada Street, Hamilton, ML3 0AA
Phone: 07551 840 831   
Email: jim.blake@southlanarkshire.gov.uk  
179

Page 180

Detailed planning application 
Paper apart – Application number: P/22/0699 
Conditions and reasons 
01. No conditions to be attached.   
Reason: Planning permission is granted unconditionally. 
180

Page 181

181

Page 182

182

Page 183

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/22/0498
Demolition of existing garage and shed and erection of new shed and
gym 
1 Summary application information
Amended
•  Application type:  Householder
•  
Applicant:  Mrs Kirsty Archer Ritchie
•  Location:  20 Stonehouse Road
Sandford
Strathaven
ML10 6PD 
[1purpose]
2 Recommendation
2.1 The Committee is asked to approve the following recommendation:-
[recs]
(1) Grant detailed planning permission (subject to conditions) based on conditions
attached.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
3 Other information
♦ Applicant’s Agent: Euan Anderson
♦ Council Area/Ward: 05 Avondale and Stonehouse
♦ Policy Reference(s): Policy 3 General Urban Areas
Policy 5 Development Management and
Placemaking
Policy DM2 House Extensions and Alterations
Policy NHE6 Conservation areas 
♦   Representation(s): 
► 6 Objection Letters
► 0  Support Letters
► 0 Comment Letters 
14
183

Page 184

♦   Consultation(s):   
None 
184

Page 185

Planning Application Report
1 Application Site
1.1 The application site consists of a modern one and a half storey building, located at 20
Stonehouse Road.  It was originally constructed as a new build dwellinghouse in the
late 1990s and is part of a small development which was approved under Planning
Application EK/95/0201, and an amendment to the original consent was approved
under Planning Application EK/98/021.  The development was constructed using
traditional materials and has a distinctive character to reflect the rural setting and the
proximity to Sandford Conservation Area.  Condition 6 of the original planning
application EK/98/0201 removes all the householder permitted development rights,
therefore, planning consent is required for all development proposals within the
housing development. 
1.2 Part of Stonehouse Road is located within Sandford Conservation Area and the
application site is adjacent to the boundary of the Conservation Area.  There is a
mixture of house types along Stonehouse Road including single storey and one and a
half storey cottages, and two storey dwellinghouses.  The property is bound to the
north by Stonehouse Road and by residential properties on all other sides. 
2 Proposal
2.1 The applicant seeks consent for the removal of the existing garden buildings and the
erection of a new building containing a home gym and store at the rear of 20
Stonehouse Road in Sandford.  The property is located within an established
residential area. 
2.2 When the application was originally submitted, the plans for the building had a mono
pitched metal roof with cedar and render finishes to the walls and was constructed at
an angle on the western elevation.  The applicant had also noted in the plans that the
existing leylandii hedge, which bounds the site to the south would be removed.  The
Planning Service expressed concerns relating to the design and materials in relation
to the setting and the loss of the boundary hedge which would screen the proposal. 
Amended plans were subsequently submitted which includes a gable roof with slate
effect tiles, rendered walls to match the colour of the existing house and the removal
of the angle on the west elevation.  The applicant also advised that the existing
leylandii hedge would be retained.  The applicant has also submitted a Tree Survey
Report which contains detailed guidance on the tree protection requirements during
construction. 
3 Background
3.1 Local Plan Status
3.1.1 In terms of the South Lanarkshire Local Development Plan 2 (adopted 2021), the site
is located within a general urban area, and is therefore subject to an assessment
against the following policies:- 
 Policy 3 General Urban Areas and Settlements 
 Policy 5 Development Management and Placemaking
 Policy DM2 House Extensions and Alterations
 Policy NHE6 Conservation Areas 
3.2 Relevant Government Advice/Policy
3.2.1 Given the nature and scale of the proposal, there is no specific government guidance
relevant to the determination of this application.  
185

Page 186

3.3 Planning Background
3.3.1 As stated above, the property was constructed in the late 90’s as part of a small rural
development.  The property has been extended on two previous occasions.  Planning
application EK/04/0355 for a one and a half storey side extension was approved on 1
September 2004 and planning application EK/14/0331 for the erection of a single
storey rear extension and timber decking was approved on 18 December 2014. 
4 Consultation(s)
4.1 Given the scale and nature of the development, no consultations were required for the
proposal. 
5 Representation(s)
5.1 Statutory neighbour notification was undertaken, and six letters of objection were
submitted in response to the neighbour notification process.  Five of the objections
were submitted by the occupants of the property to the rear of the site and one was
submitted by the occupant to the west of the site.  The grounds of objection and
matters raised are summarised below:- 
a) That the plans submitted do not show the neighbouring property and are
inaccurate.
Response:  The agent submitted updated plans which included the property to the
rear of the application site. 
b) That the plans are also inaccurate as the parking area does not include the
parking spaces and this needs to be accurate to show the available parking
for a 4/5-bedroom house.
Response:  The amended plans show the two parking spaces at the rear of the
property within the application site boundary.  The proposal does not impact on the
existing parking at the site and the proposal does not form the type of additional
accommodation which would require additional parking spaces. 
c) That the structure is excessive in size in relation to the existing property, will
impact on the available light to the neighbouring property and the removal
of the trees will impact visual amenity.
Response:  The existing rear garden measures approximately 212 square metres
and the footprint to the existing property measures 145 square metres.  The
footprint of the proposed building measures 60.3 square metres and would be 4.5
metres in height at the highest point from ground level.  While the proposal is
considered to be a relatively large structure, an adequate amount of garden ground
would remain available for amenity purposes and is not considered excessive in
relation to the existing property or rear garden.  In the original submission, the plans
stated that the existing leylandii hedge would be removed.  The Planning Service
recognises that the hedge has amenity value in screening the rear garden and
proposed building at the site and the applicants have agreed to retaining the hedge. 
The revised plans show that the proposed building would be located 1.5 metres
from the rear boundary to allow for the retention of the hedge.  Although a leylandii
hedge is not normally considered appropriate for retention or protection, it is
recognised that at this location, the hedge has significant amenity value in context
with the proposal.  Therefore, condition one of the decision notice ensures that the
trees at the site cannot be the lopped, topped, pollarded, or felled without consent
from Council.  The ridge of the gable roof would now be 3.75 metres from the rear
boundary and predominantly screened by the existing hedge which measures
approximately 3.8 metres in height. In addition, the materials for the roof would be
a slate effect tile rather than metal in the original submission, which reflects the
character of surrounding development. 
186

Page 187

d) That the proposed render finish on the southern elevation of the proposed
building is not in keeping with the surrounding development.
Response:  The Planning Service also had concerns relating to the design and
materials in the original plans submitted.  The original housing development was
carefully designed to reflect the rural character of the setting and the proximity to
Sandford Conservation Area.  The amended plans are considered to address these
concerns in relation to the design and materials.  The amended design, with the
gable roof finished with slate effect tiles and the rendered walls to match the colour
of the existing property, are considered to reflect the character and materials of the
surrounding development. 
e) That the structure would have a negative impact on the value of neighbouring
properties.
Response:  The value of properties is not a material planning consideration. 
f) That the building should not be used for a garden room or granny flat.
Response:  The use of the building as a garden room would be permitted as this
would be an acceptable use ancillary to the residential dwelling.  However, the use
as a separate residential annexe would not be permitted. Condition 3 of the
decision notice prohibits the use as a separate residential annexe and any
commercial activity in, or from the building. 
g) That the removal of the 12 trees at the site will have an environmental impact.
Response:  As stated previously in part c) of this section, the leylandii trees will
be retained as it is recognised that the hedge has significant value at this location
in terms of amenity value and sustainability. 
h) That the access route is not suitable for the delivery of building materials.
Response:  There is a road with a turning area to the rear of the site.  The applicant
would be responsible for ensuring that the delivery vehicles for materials can
access the site and be aware of any legal restrictions relating to access on the
private road.  If any obstruction occurs, this is a Police matter, and this service
should be contacted
i) The drawings state they are not to scale therefore do not indicate the impact
on the back garden of a house that has already been extended.
Response:  The standard point relating to scale is normally an advisory reference
for the builders/contractors for the works.  The plans submitted have a scale and
measurements on the drawings which details the dimensions and proportions of
the proposal.  As stated in section c) above, the proposal is not considered to be
excessive for the site or in context with the existing dwelling. 
j) That the new plans submitted containing the name of the property is in the
wrong location.
Response:  The location of the name of the property at the rear on the Ordinance
Survey base map does not affect the assessment of the proposal as the location
of the property is shown in context with the proposed development. 
k) That the plans do not clearly demonstrate the impact of the proposed
structure on the neighbouring property and will dwarf the neighbouring
property. 
Response:  The building in the original submission and the removal of the
boundary hedge was considered to have a detrimental impact on the visual
amenity of the neighbouring property.  The amended proposal includes a pitched
roof and the retention of the hedge which together will reduce the visual impact in
comparison to the original submission.  The ridge height of the building would be
187

Page 188

4.5 metres at the highest point and the existing hedge measures 3.8 metres.  The
amended roof type and distance from the boundary of the ridge level will also
reduce the visual impact of the proposal.  The proposal is therefore not considered
to dwarf the neighbouring property as it will be predominantly screened by the
boundary hedge and the single storey ridge line would be below that of the
neighbouring property. 
l) That the noise from the equipment in the gym would have an impact on noise
levels to the neighbouring property. 
Response:  The proposed gym is for personal use and the equipment would be of
a domestic scale which is unlikely to have a significant impact on noise levels from
the building.  An advisory note relating to any nuisance would be attached to the
decision notice, however, should issues arise in relation to noise levels,
Environmental Services should be contacted on 0303 123 1015. 
m) That the proposed development will exacerbate the impression of higher
density building which is immediately adjacent to the boundary of the
conservation area where the buildings are low-density with large gardens. 
Response:  The application site is located adjacent to the boundary of Sandford
Conservation Area within a development which was carefully designed to reflect
the rural character of the setting.  Supporting guidance in the carrying out of
development at a dwellinghouse, relating to ancillary detached buildings states that
a usable amount of garden ground should remain undeveloped to allow for drying
clothes, bin storage and general amenity.  Permitted Development Rights allow for
50% of the garden to be developed without requiring planning consent.  In this
case, while over 50% of the garden remains undeveloped, the development height
exceeds the permitted height of 4 meters by 0.5 metres.  In addition, Permitted
Development Rights were removed for all development in the original consent for
the development, therefore planning consent is required in all cases.  It is
considered that a usable amount of garden ground remains for the purposes
specified above and that the proposal complies with this guidance. As such, the
proposal is not considered to result in over-development of the site. 
n) That the proposal will impact on the viability of the neighbouring beech tree
which enhances the local setting and conservation area and would have a
negative impact on nature conservation.  That the tree should be inspected
by an arboreal consultant in accordance with BS5837.2012.
Response:  The site is located adjacent to the boundary of Sandford Conservation
Area and the tree referred to above is located within the Conservation Area. 
Although the tree is in the rear garden of the neighbouring property and not clearly
visible in the streetscape, it is considered to make a positive contribution to the
Conservation Area setting.  In the original plans submitted, the building was set at
an angle adjacent to the western boundary which would have been positioned over
the root system of the tree.  The amended proposal squares the building off which
leaves a space nearest the tree to minimise potential damage to the root system. 
The applicant was also asked to provide a Tree Survey Report which assesses the
impact on the trees at the site and the required tree protection at the site.  As part
of this assessment, trial pits were dug to assess the root spread at the site.  The
report also set out the position of tree protection barriers which would be required
during the construction of the proposal.  The report advised that there would be
minimal loss of important rooting volume and that the proposal would have minimal
effect on the survivability of the tree.  Given that the beech tree and the leylandii at
the site contribute to the setting and assist in screening the proposed building, the
protection of these trees is considered necessary during construction of the
building.  The Tree Survey Report commissioned by the applicant contains detailed
188

Page 189

guidance on how these works should be carried out.  The applicant has advised
that some pruning work would be required from within the site to facilitate the
construction of the proposal.  Details of the tree works at the site will be submitted
to the Council for assessment prior to the commencement of works.  Condition two
of the decision notice requires the submission of a scheme of protection for the
trees in accordance with BS 5837:2012 and that the development will be
implemented in strict accordance with the approved details. 
o) That the revised drawings are still inaccurate in showing the location of the
neighbouring property and that a site visit would confirm this.
Response:  The location of the neighbouring property is shown in the revised
plans. The positioning of the name of the property does not affect the assessment
of the proposal and a detailed site visit and survey was completed on 19 May 2022. 
p) That measurements of the revised plans are not correct.
Response:  The amended plans did not contain the correct measurement of the
length of the structure.  An amended plan has been submitted which shows the
measurement amended from 13.4 metres to 11.2 metres. 
q) That there has been a substantial revision, are details of the discussions with
the Planning Officer relating to the amendments of the proposal available
and that neighbours were not notified of the amendments.
Response:  The Planning Officer contacted the agents for the applicant on 26 May
2022 advising that the Planning Service had concerns relating to the design and
visual impact of the proposal.  That the existing housing development was of a
distinctive character and that the removal of hedge to the rear of the proposal
should be reconsidered.  Further neighbour notification was not considered as the
proposal was a reduction in scale and was not considered to have an additional
impact on neighbouring amenity. 
r) That the structure is of commercial dimensions and a precedent will be set
in the conservation village of Sandford.
Response:  Condition number 3 of the planning decision notice prohibits
commercial activity in or from the building.  The application site is not located within
Sandford Conservation Area, however, given the close proximity to the
Conservation Area and the distinctive design of the existing modern development,
the amended design and materials are considered to better reflect the
surroundings.  Each planning application is considered on its own merits and
assessed in terms of the development plan policies and the individual setting. 
5.2 These letters are available for inspection on the planning portal. 
6 Assessment and Conclusions
6.1 The applicant seeks consent for the removal of the existing garden buildings at the
rear of the property and the erection of a new building containing a home gym and
store in the rear garden of the property.  The proposed development requires to be
assessed against the provisions of the South Lanarkshire Local Development Plan 2
(adopted 2021). In this instance Policies 3, 5, DM2 and NHE6 of the development plan
and the associated guidance are applicable. 
6.2 Policy 3 – General Urban Area/Settlements of the adopted plan supports the principle
of residential developments in residential designated areas such as the area within
which the application site is located and seeks to ensure that proposed developments
do not adversely affect the surrounding area in terms of issues such as layout, scale,
massing, and amenity.  With regard to the specific design and layout of the site, Policy
189

Page 190

5 – Development Management and Placemaking requires all proposals to take
account of and be integrated with the local context and built form, should be
appropriately designed, and scaled, with no adverse amenity impacts.  The policy
states that development proposals should have no significant adverse impacts on the
local community in terms of issues such as noise, smell, disturbance and traffic or
public safety issues. 
6.3 Policy DM2 generally reflects the content of Policies 3 and 5 of the adopted plan and
states that proposed developments are required to relate satisfactorily to nearby
development in terms of scale, massing, and materials.  Additionally, the policy
requires that development proposals do not adversely affect neighbours by
overshadowing or overlooking their property. 
6.4 In terms of Policy NHE6 – Conservation Areas, although the property is not within
Sandford Conservation Area, the site is located directly opposite the conservation
area, therefore it is considered appropriate to assess the proposal in terms of the
impact on the Conservation Area and it’s setting. Policy NHE6 states that trees which
are considered by the Council to have amenity value and contribute to the character
and appearance of the Conservation Area shall be preserved. 
6.5 When the application was originally submitted, the design and materials of the building
were not considered to reflect the character of the surrounding development.  The site
is located within a small development which was approved in planning application
EK/95/0201 and the further amendment application EK/98/021.  The approval detailed
the very specific use of materials and removed the Householder Permitted
Development Rights to enable the Planning Authority to assess all development
proposals within the site in order to ensure that all development proposals were
appropriately designed and scaled, reflecting the character of the area.  The mono-
pitched roof, angular design and modern cladding were not considered compatible
with the design and finishing materials of the surrounding development.  The plans
also noted that the existing leylandii hedge would be removed and showed the angular
section of the building to the west was in close proximity to a mature beech tree within
the adjacent Conservation Area.  Although the site is not within Sandford Conservation
Area, it is directly opposite the boundary and the original consent for the development
contained specific criteria relating to design and finishing materials. It is therefore
considered that careful consideration is required to the design and proposed materials
to ensure the proposed development reflects the character and surroundings of this
particular setting. 
6.6 After discussions with the Planning Service, and the consideration of representations,
the applicant submitted a revised proposal.  The amended design of the building has
a pitched roof and is set further off the rear boundary to ensure that the leylandii hedge
is retained and impact on the neighbour is mitigated.  The angular section to the
western boundary has been removed to allow for a greater distance from the root
network of the beech tree within the Conservation Area in accordance with Policy
NHE6 – Conservation Areas.  The applicant has also submitted a Tree Survey Report
which has set out the tree protection area which would minimise the impact on the
trees at the site.  In addition, the finishing materials have been amended and include
a slate effect tile on the roof and the walls would be rendered and painted in a colour
to match the existing dwellinghouse at the site.  This is considered a more traditional
palette of materials appropriate for this location. 
6.7 The proposal is not considered to significantly impact the neighbouring properties in
terms of overshadowing or loss of light given its orientation, scale, and location from
other properties. In addition, the existing boundary hedge to the rear is of a similar
190

Page 191

height to the proposal and closer to the property to the rear.  The overall massing is
not considered to be overbearing due to the separation and hedge.  In terms of car
parking, the proposal would not impact on the available parking at the site.  Conditions
have been added to the decision notice which prohibit the felling of the trees at the site
and to protect the leylandii and beech tree during the construction of the proposal.  A
condition has also been included which prohibits commercial activity from the building
and the use as a separate residential annex.  It is therefore considered that the
amended proposal complies with the relevant adopted polices outlined above, and
carefully considers the surrounding setting and previous design principles of the
development. 
6.8 As a result of the statutory neighbour notification process, six letters of objection and
one letter of comment were received in relation to this application.  The contents of
these representations are addressed in section two above.  
6.9 In summary, following a full and detailed assessment of the proposed development, it
is considered that it would have no significant adverse impact upon residential or visual
amenity, or the character of the adjacent Conservation Area, and that it is in
accordance with the relevant policies of the adopted South Lanarkshire Local
Development Plan 2 (2021).  As such, the granting of planning permission is
recommended. 
7 Reasons for Decision
7.1 The proposal is considered acceptable in terms of the proposed use, scale, design
and siting, the potential impact on residential and visual amenity, and is in accordance
with Policies 3, 5, DM2 and NHE6 of the adopted South Lanarkshire Local
Development Plan 2.  There are no other material considerations which would justify
the refusal of planning permission. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 29 September 2022 
Previous references
 EK/95/0201
 EK/98/021
 EK/04/0355
 EK/14/0311 
List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter dated 
► Representations           Dated:
Mrs Sandra Ogg, Culag House, Stonehouse Road, Sandford,
ML10 6PD 
29.04.2022 
Dr Michael Park, 18 Stonehouse Road, Sandford,
Strathaven, ML10 6PD 
28.04.2022 
191

Page 192

Mr Alister Ogg, Culag House, Stonehouse Road, Sandford,
ML10 6PD 
29.04.2022 
Sandra Ogg, By Email  21.04.2022 
Mr Alister Ogg, Culag House, Stonehouse Road, Sandford,
Strathaven, ML10 6PD 
04.07.2022 
Sandra Ogg, 31 Carron Place, East Kilbride, G75 0YL  05.07.2022 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Evelyn-Ann Wilson, Planning Officer, Floor 6, Council Offices, Almada Street, Hamilton,
ML3 0AA
Phone: 07551 842 952   
Email: evelyn-ann.wilson@southlanarkshire.gov.uk  
192

Page 193

Detailed planning application 
Paper apart – Application number: P/22/0498 
Conditions and reasons 
01. Notwithstanding the development hereby approved, no trees within the application site
shall be lopped, topped, pollarded, or felled, and no shrubs or hedges shall be
removed from the application site without the prior written consent of the Council as
Planning Authority.   
Reason: In the interests of amenity and to ensure the protection and maintenance of
the existing trees and other landscape features within the site. 
02. Prior to the commencement of the development hereby approved (including any
demolition and all preparatory work), a scheme for the protection of the retained trees,
in accordance with BS 5837:2012, including a tree protection plan(s) (TPP) and an
arboricultural method statement (AMS) shall be submitted to and approved in writing
by the Council as Planning Authority. 
Specific issues to be dealt with in the TPP and AMS: 
a) Location and installation of services/ utilities/ drainage. 
b) Methods of demolition within the root protection area (RPA as defined in BS 5837:
2012) of the retained trees. 
c) Details of construction within the RPA or that may impact on the retained trees. 
d) A full specification for the installation of boundary treatment works. 
e) A full specification for the construction of any roads, parking areas and driveways,
including details of the no-dig specification and extent of the areas of the roads,
parking areas and driveways to be constructed using a no-dig specification. Details
shall include relevant sections through them. 
f) Detailed levels and cross-sections to show that the raised levels of surfacing, where
the installation of no-dig surfacing within Root Protection Areas is proposed,
demonstrating that they can be accommodated where they meet with any adjacent
building damp proof courses. 
g) A specification for protective fencing to safeguard trees during both demolition and
construction phases and a plan indicating the alignment of the protective fencing. 
h) A specification for scaffolding and ground protection within tree protection zones. 
i) Tree protection during construction indicated on a TPP and construction and
construction activities clearly identified as prohibited in this area. 
j) Details of site access, temporary parking, on site welfare facilities, loading, unloading
and storage of equipment, materials, fuels and waste as well concrete mixing and use
of fires 
k) Boundary treatments within the RPA 
l) Methodology and detailed assessment of root pruning 
m) Arboricultural supervision and inspection by a suitably qualified tree specialist 
n) Reporting of inspection and supervision 
o) Methods to improve the rooting environment for retained and proposed trees and
landscaping 
p) Veteran and ancient tree protection and management. 
The development shall thereafter be implemented in strict accordance with the
approved details.  
193

Page 194

Reason:  To ensure that the trees to be retained will not be damaged during demolition
or construction and to protect and enhance the appearance and character of the site
and locality. 
03. The outbuilding hereby approved shall be used for domestic use only for the purposes
incidental to the enjoyment of the dwellinghouse at 20 Stonehouse Road, Sandford,
Strathaven, ML10 6PD, and shall be used for no other purpose without the express
grant of planning permission from the planning authority.  For the avoidance of doubt,
no commercial activity shall be carried out in or from the building hereby approved,
and the use as separate residential accommodation is prohibited. 
Reason: To safeguard the residential amenity of the area and to enable the planning
authority to consider the implications of any subsequent change of use on the
amenities of the area. 
194

Page 195

195

Page 196

196

Page 197

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/22/0779
Amendment to planning permission P/20/1667 to remove Madrid
House Type, remix plots and addition of garden rooms to 20 plots 
1 Summary application information
Amended
•  Application type:  Detailed planning application
•  
Applicant:  Robertson Living 
•  Location:  Land 90M ESE of 24 Simpson Drive
Strutherhill
Larkhall
South Lanarkshire  
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) Grant detailed planning permission (subject to conditions) based on conditions
attached.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
3 Other information
♦ Applicant’s Agent: N/A
♦ Council Area/Ward: 20 Larkhall
♦ Policy Reference(s): South Lanarkshire Local Development Plan 2
(adopted 2021)
Policy 1 - Spatial Strategy
Policy 2 - Climate Change
Policy 5 - Development Management and Place
Making
Policy 7 - Community Infrastructure Assessment
Policy 11 - Housing Land
Policy 13 - Green Network and Greenspace
Policy 14 - Natural and Historic Environment
Policy 15 - Travel and Transport 
Policy 16 - Water Environment and Flooding
Policy DM1 - New Development Design
15
197

Page 198

Policy DM15 - Water Supply
Policy SDCC2 - Flood Risk
Policy SDCC3 - Sustainable Drainage Systems 
♦   Representation(s): 
► 0  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
♦   Consultation(s):   
Roads Development Management Team 
198

Page 199

Planning Application Report
1 Application Site
1.1 The application relates to an area of land located at the edge of the Strutherhill
Industrial Estate off Carlisle Road, to the south of Larkhall town centre.  The site is
mainly vacant with construction works underway for a residential development
approved under planning application P/20/1667.  The site was previously occupied by
the former DAKS Simpson warehouse and is irregular in shape and mostly flat.  The
site is bounded to the north and east by open grassland, to the south by industrial
buildings and to the west by a mixture of housing, including recently constructed
dwellings within the former DAKS Simpson site, a sewage works and Strutherhill. 
2 Proposal(s)
2.1 The applicant seeks consent for an amendment to planning permission P/20/1667 to
remove the Madrid House Type, remix plots and add garden rooms to 20 plots.  The
overall residential development previously approved under the above application
comprises a total of 128 dwellings.  The current proposal is for the same number of
dwellings but with a change from a mix of 106 detached and 22 semi-detached three
and four bedroom dwellings to a mix of 102 detached and 26 semi-detached three and
four bedroom dwellings.  A total of 64 plots are being altered under the current planning
application. 
2.2 The proposed houses would be two storeys in height and would be finished with
concrete roof tiles, rendered walls and UPVC windows and doors.  Car parking within
the development would be located on driveways located to the front and side of the
dwellings with 2 parking spaces incorporated for the three bedroom dwellings and 3
parking spaces for those dwellings with four bedrooms.  The overall layout for the
development incorporates two main areas of amenity open space within the eastern
and western areas of the site including a SUDS Basin.  A four metre high acoustic
barrier comprising of an earth bund and a timber fence above is proposed along the
main section of the southern boundary of the site facing onto Borland Drive and the
adjacent industrial estate. 
2.3 The proposed amendments amount to more than what would be classed as a non-
material variation.  In line with the guidance contained within the Council’s Planning
Application Decision Making Process, the application requires to be referred to the
Planning Committee for a decision as more than 49 residential units are affected by
the proposed alterations. 
3 Background
3.1 Local Plan Background
3.1.1 The application site is designated as a proposed housing site in the adopted South
Lanarkshire Local Development Plan 2.  The site is also covered by the Green
Network.  The relevant policies in terms of the assessment of the application are Policy
1 - Spatial Strategy, Policy 2 - Climate Change, Policy 5 - Development Management
and Place Making, Policy 7 - Community Infrastructure Assessment, Policy 11 -
Housing Land, Policy 13 - Green Network and Greenspace, Policy 14 - Natural and
Historic Environment, Policy 15 - Travel and Transport, Policy 16 - Water Environment
and Flooding, Policy DM1 - New Development Design, Policy DM15 - Water Supply,
Policy SDCC2 - Flood Risk and Policy SDCC3 - Sustainable Drainage Systems of the
adopted South Lanarkshire Local Development Plan 2 in addition to the Residential
Design Guide (2011).  The content of the above policies and documents and how they
relate to the proposal is assessed in detail in Section 6 of this report.  
199

Page 200

3.2 Relevant Government Advice / Policy
3.2.1 In terms of residential development, Scottish Planning Policy (SPP) requires Councils
to maintain a five year supply of effective housing land. Planning Authorities are also
required to promote the efficient use of land by directing development towards sites
within existing settlements, where possible, in order to make effective use of existing
infrastructure and service capacity. 
3.2.2 Designing Streets – A Policy Statement for Scotland was introduced in March 2010
and marks the Scottish Government’s commitment to move away from a standardised
engineering approach to streets and to raise the quality of design in urban and rural
development.  Development layouts should be designed to encourage a safe
environment for pedestrians and cyclists with narrower streets, carefully positioned
dwellings, landscaping and off-street parking which can be more effective at achieving
slower traffic movements.  Permeability which encourages walking is seen as a high
priority and footpath links are encouraged to ensure that houses can be easily
accessed from main public transport routes. 
3.3 Planning Background
3.3.1 Planning permission was granted to Robertson Living for the erection of 128
dwellinghouses with associated roads, landscaping, SUDS and noise attenuation
bund (Approval of matters specified in conditions, consent HM/17/0167) on 16 June
2021 (P/20/1667). 
3.3.2 Planning Permission in Principle was granted to Patersons of Greenoakhill Ltd on 4
July 2019 for residential development with landscaping and associated works within
the former DAKS Simpson site (HM/17/0167).  This permission was granted subject
to the conclusion of a Section 75 Obligation to ensure that appropriate financial
contributions are made at appropriate times during the development towards
additional nursery, primary and secondary education accommodation as appropriate,
provision of appropriate community facilities either on site or off and the provision of
affordable housing on site or by way of a commuted sum. 
3.3.3 Planning Permission in Principle was granted to Patersons Property Investment
Partnership LLP on 6 May 2015 for a proposed residential and commercial
development within the application site (HM/13/0269).  This permission was granted
subject to the conclusion of a Section 75 Obligation to ensure that appropriate financial
contributions are made at appropriate times during the development towards
additional nursery, primary and secondary education accommodation as appropriate,
provision of appropriate and / or financial contribution to community facilities partly on
site and off and the provision of affordable housing by way of a commuted sum. 
4 Consultation(s) 
4.1 Roads Development Management Team – have no objections to the application.
Response: Noted. 
5 Representation(s)
5.1 Statutory neighbour notification procedures were undertaken and the application was
advertised under the heading Non-Notification of Neighbours in the Hamilton
Advertiser.  No letters of representation have been received in relation to the
application. 
200

Page 201

6 Assessment and Conclusions
6.1 The application is for an amendment to planning permission P/20/1667 to remove the
Madrid House Type, remix plots and add garden rooms to 20 plots.  The application
is an amendment to a previously approved proposal under application P/20/1667 and
whilst the proposed amendments are more than what would be classed as non-
material variations, they are nevertheless relatively minor in nature.  As discussed, in
line with the guidance contained within the Council’s Planning Application Decision
Making Process the application requires to be referred to the Planning Committee for
a decision as more than 49 residential units are affected by the proposed alterations.
The determining issues in consideration of this application are its compliance with
national and local plan policy and the proposal’s impact on the amenity of adjacent
properties and on the local road network. 
6.2 In terms of national planning policy, SPP requires Councils to maintain a five year
supply of effective housing land. Planning Authorities are also required to promote the
efficient use of land by directing development towards sites within existing settlements,
where possible, in order to make effective use of existing infrastructure and service
capacity.  Designing Streets – A Policy Statement for Scotland supports Designing
Places and encourages a move away from a standardised engineering approach to
streets and promotes quality of design in urban and rural development.  Development
layouts should be designed to encourage a safe environment for pedestrians and
cyclists with narrower streets, carefully positioned dwellings, landscaping and off-
street parking which can be more effective at achieving slower traffic movements. 
Permeability which encourages walking is seen as a high priority and footpath links
are encouraged to ensure that houses can be easily accessed from main public
transport routes. 
6.3 In general land use and policy terms the principle of residential development at this
location has previously been assessed and approved under the application for
planning permission in principle (HM/17/0167) in addition to the matters specified in
conditions which were approved under planning application P/20/1667.  The proposal
involves the re-use of a previously developed site which would have a positive impact
on the built and natural environment.  The proposal also promotes development in a
sustainable location which would be accessible by public transport, with bus routes
located on the adjacent Strutherhill and in terms of permeability the development
would be well integrated into existing walking and cycling networks.  It is, therefore,
considered that the proposal is in accordance with national planning policy. 
6.4 In terms of local plan policy, the application site is designated as a proposed housing
site in the adopted South Lanarkshire Local Development Plan 2.  The site is also
covered by the Green Network.  The relevant policies in terms of the assessment of
the application are Policy 1 - Spatial Strategy, Policy 2 - Climate Change, Policy 5 -
Development Management and Place Making, Policy 7 - Community Infrastructure
Assessment, Policy 11 - Housing Land, Policy 13 - Green Network and Greenspace,
Policy 14 - Natural and Historic Environment, Policy 15 - Travel and Transport, Policy
16 - Water Environment and Flooding, Policy DM1 - New Development Design, Policy
DM15 - Water Supply, Policy SDCC2 - Flood Risk and Policy SDCC3 - Sustainable
Drainage Systems of the adopted South Lanarkshire Local Development Plan 2 in
addition to the Residential Design Guide (2011). 
6.5 The application site is designated for residential use under the terms of Policy 11.  As
discussed above, the site also benefits from the planning permission in principle
granted for residential development under application HM/17/0167 and the matters
specified in conditions which were approved under planning application P/20/1667. 
201

Page 202

On this basis, the proposal raises no policy issues and, therefore, conforms with Policy
11. 
6.6 Policies 1 and 2 encourage sustainable economic growth and regeneration, a move
towards a low carbon economy, the protection of the natural and historic environment
and mitigation against the impacts of climate change.  In line with these policies, the
proposal involves the redevelopment of a previously developed site which is located
in a sustainable location within Larkhall and where the principle of residential use is
considered to be acceptable.  The site benefits from opportunities for trips by public
transport, with bus routes located on the adjacent Strutherhill and the development
would be well integrated into existing walking and cycling networks.  The site is also
located within an acceptable distance to commercial services such as retail, leisure,
schools, health care etc.  The proposed development offers an opportunity to enhance
the built environment in the immediate area and it is considered that the
redevelopment of the site would result in an attractive and vibrant addition to
neighbouring development.  Furthermore, the houses within the development have
been designed to the latest technical standards in terms of insulation, air tightness and
energy ratings.  It is, therefore, considered that the proposal meets the terms of
Policies 1 and 2. 
6.7 In terms of the detailed design of the development, Policies 5 and DM1 generally
require new development to have due regard to the layout, form, design and local
context of the area and to promote quality and sustainability in its design.  The
application site is also covered by the Green Network under Policy 13 which aims to
safeguard the local green network identified on the proposals map and identify
opportunities for its enhancement and/or extension.  Policy 15 seeks to ensure that
development considers, and where appropriate, mitigates the resulting impacts of
traffic growth and encourages sustainable transport options that take account of the
need to provide proper provision for walking, cycling and public transport. 
6.8 In relation to the above policies it is considered that the amended layout for the
development is acceptable and that it meets the main standards set out in the
Council’s Residential Design Guide, particularly in relation to window to window
distances, garden depths, amenity open space and car parking.  The proposed two
storey houses are of modern design with a suitably high standard of external finishing
materials and it is considered that the development will be in keeping with the existing
residential development in the surrounding area.  Areas of landscaping are proposed
throughout the development and the landscaping scheme submitted with the
application is considered to be acceptable and should ensure enhanced opportunities
for biodiversity and leisure within the site and the surrounding area.  The proposed
amendments to the layout have been assessed by the Council’s Roads and
Transportation Service who are satisfied that the layout is acceptable and that the
proposal raises no access, parking or road safety issues.  In view of the above, it is
considered that the proposal would relate satisfactorily to adjacent residential
development in terms of its scale, design and materials and that the character and
amenity of the area would not be impaired by reason of traffic generation, parking or
visual intrusion.  The proposal is, therefore, considered to be in accordance with the
terms of Policies 5, DM1, 13 and 15. 
6.9 With regard to Policy 7, the Section 75 Obligation associated with the previously
approved planning permission in principle (HM/17/0167) requires the applicant to pay
financial contributions at appropriate stages of the development towards the provision
of additional nursery, primary and secondary education accommodation as
appropriate and the provision of community facilities.  The required contributions would
202

Page 203

be made in line with the terms of the above Obligation, therefore, the proposal meets
the terms of Policy 7. 
6.10 The previously approved layout was assessed by the relevant consultees in terms of
Policies 16, DM15, SDCC2 and SDCC3.  With regard to flooding and surface water
drainage, no adverse comments were raised by Roads and Transportation Services
subject to the Council’s Sustainable Urban Drainage Systems (SUDS) design criteria
being satisfied through the completion of the standard self-certification documents.
Scottish Water also confirmed that they had no objections to that application and any
consent granted would include a condition to ensure that no dwellings are occupied
until the site is served by a sewerage scheme constructed in accordance with Scottish
Water standards.  It is, therefore, considered that the proposal is in accordance with
the terms of the above policies. 
6.11 In summary, it is considered that the application conforms with national and local plan
policy and that the proposal raises no significant environmental or infrastructure
issues.  It is therefore recommended that the application be granted subject to the
conditions listed. 
7 Reasons for Decision
7.1 The proposal has no adverse impact on residential or visual amenity nor raises any
environmental or infrastructure issues and complies with Policies 1, 2, 5, 7, 11, 13, 14,
15, 16, DM1, DM15, SDCC2 and SDCC3 of the adopted South Lanarkshire Local
Development Plan 2 (2021). 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 29 September 2022 
Previous References
 P/20/1667
 HM/17/0167
 HM/17/0484
 HM/13/0269 
List of Background Papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter dated 16 June 2022
► Press Advertisement, Hamilton Advertiser 30.06.2022 
► Consultations
Roads Development Management Team 02.09.2022 
► Representations     
None 
203

Page 204

Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Jim Blake,Planning Officer, Floor 6, Council Offices, Almada Street, Hamilton, ML3 0AA
Phone: 07551 840 831   
Email: jim.blake@southlanarkshire.gov.uk  
204

Page 205

Detailed planning application 
Paper apart – Application number: P/22/0779 
Conditions and reasons 
01. That before development starts, full details of the design and location of all fences and
walls, including any retaining walls, to be erected on the site shall be submitted to and
approved by the Council as Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
02. That before any of the dwellinghouses situated on the site upon which a fence is to be
erected is occupied, the fence or wall for which the permission of the Council as
Planning Authority has been obtained under the terms of Condition 1, shall be erected
and thereafter maintained to the satisfaction of the Council.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
03. That notwithstanding the terms of Condition 1 above, before development starts,
details of all boundary treatment(s) shall be submitted to and approved by the Council
as Planning Authority and thereafter all approved works shall be completed to the
satisfaction of the Council prior to the development hereby approved being occupied
or brought into use.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
04. That before any development commences on site or before any materials are ordered
or brought to the site, details and samples of all materials to be used as external
finishes on the development shall be submitted to and approved by the Council as
Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
05. That unless otherwise agreed, before development starts, full details of the design and
location of any fence enclosing the proposed SUDS Facility shall be submitted to and
approved by the Council as Planning Authority.  Thereafter, the fence shall be erected
and maintained to the Council's satisfaction.   
Reason: In order to retain effective planning control. 
06. That no dwellinghouse shall be occupied until the site is served by a sewerage scheme
constructed in accordance with Scottish Water standards and as approved by the
Council as Planning Authority in consultation with Scottish Water as Sewerage
Authority.   
Reason: To ensure the provision of a satisfactory sewerage system. 
07. That no development shall commence until details of surface water drainage
arrangements have been submitted to and approved in writing by the Council as
Planning Authority; such drainage arrangements will require to comply with the
205

Page 206

principles of sustainable urban drainage systems and with the Council's Sustainable
Drainage Design Criteria and shall include signed appendices as required.  The
development shall not be occupied until the surface drainage works have been
completed in accordance with the details submitted to and approved by the Council as
Planning Authority.   
Reason: To ensure that the disposal of surface water from the site is dealt with in a
safe and sustainable manner, to return it to the natural water cycle with minimal
adverse impact on people and the environment and to alleviate the potential for on-
site and off-site flooding. 
08. That details of the phasing of the development shall be submitted to the Council for
approval, and no work shall begin until the phasing scheme has been approved in
writing.  Following approval, the development shall be implemented in accordance
with the approved scheme.   
Reason: In the interests of amenity and in order to retain effective planning control. 
09. That unless otherwise agreed, all open pipes shall be closed-up at the end of each
working day and trenches shall be covered or a ramp provided to permit animals that
fall in a means of exit and to prevent animals becoming trapped.  Chemicals and
materials shall be stored securely to the satisfaction of the Council.   
Reason: In order to retain effective planning control. 
10. That unless otherwise agreed in writing, site clearance works shall be undertaken
outside the bird nesting season March to August.   
Reason: In order to retain effective planning control. 
11. That the mitigation measures included in the submitted Noise Impact Assessment
(Technical Report No. R-8664-LH2-RGM) dated 15 February 2021 shall be
implemented prior to the development being brought into use and shall be
maintained in accordance with the approved scheme to the satisfaction of the
Council as Planning Authority.   
Reason: To minimise noise disturbance. 
12. (a) Remediation of the site shall be carried out in accordance with the approved
remediation plan prior to the proposed development being brought into use.  Any
amendments to the approved remediation plan shall not be implemented unless
approved in writing by the Council as Planning Authority.   
(b) On completion of the remediation works, the developer shall submit a completion
report to the Council as Planning Authority, confirming that the works have been
carried out in accordance with the approved remediation plan and that the works
have successfully reduced these risks to acceptable levels.   
(c) Any previously unsuspected contamination which becomes evident during the
development of the site shall be brought to the attention of the Council as Planning
Authority within one week or earlier of it being identified.  A more detailed site
investigation to determine the extent and nature of the contaminant(s) and a site-
specific risk assessment of any associated pollutant linkages, shall then require to be
submitted to and approved in writing by the Council as Planning Authority.  
206

Page 207

Reason: To avoid unacceptable risks to human health and the environment, to ensure
that the land is remediated and made suitable for its proposed use. 
13. That prior to any development taking place on site, a scheme of intrusive site
investigation works shall be submitted to and approved by the Council as Planning
Authority.  The submission shall include a report of findings arising from the intrusive
site investigations, including the results of any gas monitoring, and a scheme of
remedial works for the Council's approval in consultation with The Coal Authority.   
Reason: To ensure the safety and stability of the proposed development. 
14. In the event that the site investigations required under Condition 13 above confirm the
need for remedial works the required remedial works shall be undertaken prior to any
dwellings being occupied to the Council's satisfaction.   
Reason: To ensure the safety and stability of the proposed development. 
15. Prior to commencement of the development hereby approved, details of measures to
facilitate the provision of full fibre broadband to serve the development, including
details of appropriate digital infrastructure and a timescale for implementation, shall be
submitted to and approved in writing by the Council as Planning Authority, unless
otherwise agreed in writing with the applicant.  The approved measures shall thereafter
be carried out in accordance with the agreed implementation timescale.   
Reason: To ensure the provision of digital infrastructure to serve the development. 
16. That no further changes in ground levels within the site shall take place without the
prior written consent of the Council as Planning Authority.   
Reason: In the interests of amenity and in order to retain effective planning control. 
17. That before the development hereby approved is completed or brought into use, the
new vehicular access so far as it lies within the boundaries of the road abutting the
site, shall be constructed in accordance with the specification of the Council as Roads
and Planning Authority.   
Reason: In the interests of traffic and public safety. 
18. That no dwellinghouse shall be occupied until the access roads and footpaths leading
thereto from the existing public road have been constructed in accordance with the
specification of the Council as Roads and Planning Authority.   
Reason: To ensure the provision of satisfactory vehicular and pedestrian access to the
dwellings. 
19. That before any work commences on site, full details of the proposed pedestrian/cycle
connection into the Donaldson Road public park, including method of implementation,
shall be submitted to and approved by the Council as Planning Authority.  Thereafter,
the approved works shall be implemented to the Council's satisfaction.   
Reason: These details have not been submitted or approved. 
207

Page 208

20. That the first 2 metres (minimum) length of the parking bays and the private accesses
shall be surfaced across their full width to the satisfaction of the Council as Planning
and Roads Authority.  No surface water shall egress from the parking bays, or from
the private accesses, out onto the adoptable road.   
Reason: To prevent deleterious material being carried onto the highway. 
21. That pedestrian/vehicle intervisibility splays of 2.4m x 2.4m, measured from the heel
of the footway/grass verge, shall be provided at all driveways.  Nothing higher than
0.9m shall be established within these splays. 
Reason: In the interests of public safety. 
22. That before any work commences on site, a Traffic Management Plan (TMP) shall be
submitted to and approved by the Council as Planning and Roads Authority. Once
approved the TMP shall be implemented on site and monitored to the Council's
satisfaction.  The TMP shall include wheel washing facilities and on-site parking
facilities for staff and visitors.   
Reason: These details have not been submitted or approved. 
23. That prior to the occupation of the 1st dwellinghouse details of a welcome pack shall
be submitted to and approved by the Council as Planning and Roads Authority to
encourage sustainable travel to and from the development and thereafter shall be
distributed to all future house purchasers/residents.   
Reason: To encourage sustainable travel to and from the development. 
24. That before the development hereby approved is completed or brought into use, all of
the parking spaces shown on the approved plans shall be laid out, constructed and
thereafter maintained to the specification of the Council as Planning and Roads
Authority. 
Reason: To ensure the provision of adequate parking facilities within the site. 
208

Page 209

209

Page 210

210

Page 211

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/22/0923
Erection of 19 dwellings with infrastructure, open space, road
improvements and associated works 
1 Summary application information
Amended
•  Application type:  Detailed planning application
•  Applicant:  Carmichael Homes Jackton Limited 
•  Location:  Land 35M North of Trunlehill
Newlands Road
East Kilbride
South Lanarkshire
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) Grant detailed planning permission (subject to conditions) based on conditions
attached.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
3 Other information
♦ Applicant’s Agent: Daniel Harrington
♦ Council Area/Ward: 06 East Kilbride South
♦ Policy Reference(s): South Lanarkshire Local Development Plan 2
(adopted 2021)
Policy 2 - Climate Change
Policy 3 - General Urban Areas
Policy 5 - Development Management and
Placemaking
Policy 11 - Housing
Policy 14 - Natural and Historic Environment
Policy DM1 - New Development Design
Policy NHE14 - Tree Preservation Orders 
South Lanarkshire Council Residential Design
Guide 
16
211

Page 212

♦   Representation(s): 
► 0  Objection Letters
► 0  Support Letters
► 0  Comment Letters 
♦   Consultation(s):   
Roads and Transportation Services (Development Management) 
Environmental Services 
Roads and Transportation Services (Flood Risk Management) 
Scottish Water 
SP Energy Network 
Estates Services 
212

Page 213

Planning Application Report 
1 Application Site
1.1 The proposed development site is located near the southern edge of East Kilbride and
covers an area of approximately 0.95 hectares.  The site, which includes a gradual
upward slope from south-west to north-east, comprises the site of the former
residential dwellinghouse at Trunlehill, which has previously been demolished, and its
surrounding grounds.  The site is bounded to the north, south and east by open space
areas which form part of the East Kilbride Green Network and to the west by Newlands
Road, with a residential development site forming part of the East Kilbride Community
Growth Area located opposite.  Vehicular access to the site is taken from Newlands
Road.
2 Proposal(s)
2.1 Detailed planning permission is sought for the erection of a residential development of
19 dwellinghouses comprising 18 semi-detached dwellinghouses and one detached
dwellinghouse.  Access improvements, footpath provision and landscaping of the site
are all proposed to be undertaken as part of the development works.  In addition, the
vehicular and pedestrian access to the site from Newlands Road is proposed to be
relocated from the south-west of the site to the north-west.  The proposed
dwellinghouses have been designed in a townhouse style to account for the existing
slope and the general preference to retain substantial greenspace areas within the site
at this location. 
3 Background
3.1 Local Plan Status
3.1.1 The South Lanarkshire Local Development Plan 2 (adopted 2021) identifies the site
as being within the designated settlement of East Kilbride where Policy 3 – General
Urban Areas is applicable.  As the site is designated in the plan as a proposed housing
site Policy 11 – Housing is also considered to be of relevance, as are the following
policies:- 
- Policy 2 - Climate Change 
- Policy 5 - Development Management and Placemaking 
- Policy 14 - Natural and Historic Environment 
- Policy DM1 - New Development Design 
- Policy NHE14 - Tree Preservation Orders 
In addition, the proposal also requires to be considered against the provisions of the
Council’s Residential Design Guide.  The proposed development is considered against
these policies in Section 6 below. 
3.2 Relevant Government Advice/Policy
3.2.1 Relevant Government guidance is set out within the consolidated Scottish Planning
Policy (SPP) 2014 and National Planning Framework 3 (NPF3). NPF3 aims to facilitate
new housing development, particularly in areas where there is continuing pressure for
growth.  SPP introduces a presumption in favour of development that contributes to
sustainable development.  Furthermore, SPP states that the planning system should
enable provision of a range of attractive, well-designed, high-quality housing that
contributes to the creation of successful and sustainable places.  
213

Page 214

3.3 Planning Background
3.3.1 Planning permission was previously granted for the formation of 12 house plots within
the site in July 2015 (Planning Ref: EK/14/0347).  Subsequent to this detailed planning
permission was sought for the erection of 12 detached dwellinghouses in 2018
(Planning Ref: P/18/1792) and for the erection of 18 detached dwellings in 2021
(Planning Ref: P/21/2146).  However, both of these applications were withdrawn by
the respective applicants before a decision was taken by the Council with regard to
the proposals. 
4 Consultation(s)
4.1 Roads and Transportation Services (Development Management): Further to
discussions with the applicants and amendments to the proposed internal road layout
Roads and Transportation Services have offered no objections to the proposed
development subject to conditions relating to road improvements, access and parking
provision associated with the proposed works. 
Response: Noted. The requested conditions would be attached to any consent
issued. 
4.2 Environmental Services: Offered no objections to the proposed development subject
to a condition relating to dust management within the site.
Response: Noted. The requested conditions would be attached to any consent
issued. 
4.3 Roads and Transportation Services (Flood Risk Management): Offered no
objections to the proposed development subject to conditions relating to flood risk
management works associated with the proposed development.
Response: Noted. The requested conditions would be attached to any consent
issued. 
4.4 Estates Services: Offered no objections to the proposed development.
Response: Noted. 
4.5 Scottish Water: Offered no objections to the proposed development.
Response: Noted. 
4.6 SP Energy Networks: Have not responded to date. 
5 Representation(s)
5.1 Statutory neighbour notification was undertaken, and the proposal was advertised in
the local press for neighbour notification purposes.  However, no letters of
representation were received in respect of the proposed development. 
6 Assessment and Conclusions
6.1 Detailed planning permission is sought for the erection of a residential development of
19 dwellinghouses comprising 18 semi-detached dwellinghouses and one detached
dwellinghouse on land associated with the former residential property at Trunlehill,
Newlands Road, East Kilbride.  Access improvements on Newlands Road, footpath
provision and landscaping of the site is proposed to be undertaken as part of the
development.  In addition, the vehicular and pedestrian access to the site from
Newlands Road is proposed to be relocated from the south-west of the site to the
north-west.  
214

Page 215

6.2 The determining issues in the assessment of this application are its compliance with
local development plan policy as well as its impact on surrounding amenity.  Under the
terms of Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  In this case, the development plan against
which the proposal requires to be assessed is the South Lanarkshire Local
Development Plan 2 (adopted 2021). 
6.3 The Local Development Plan identifies the site, in land use terms, as proposed
housing land (Policy 11 – Housing) within the settlement of East Kilbride (Policy 3 –
General Urban Areas).  It is therefore noted that the principle of housing development
on this site is supported by Policies 3 and 11 of the adopted Local Development Plan. 
6.4 In terms of the detail of the proposal, Policy 5 - Development Management and
Placemaking of the adopted plan states that all planning applications should take fully
into account the local context and built form while Policy 2 - Climate Change seeks to
ensure that proposed developments, where possible, seek to minimise and mitigate
against the effects of climate change.  Furthermore, Policies 14 - Natural and Historic
Environment and NHE14 – Tree Preservation Orders seek to ensure that any proposal
should not result in any significant adverse environmental or amenity impact, including
the consideration of protected trees.  These policies are further reinforced by the
provisions of Policy DM1 - New Development Design, while further guidance on design
matters is contained in the Council’s Residential Development Guide (2011). 
6.5 With regard to the development of this site, it is noted the applicants submitted a
previous application for the erection of 18 detached dwellings on the site in 2021
(Planning Ref: P/21/2146).  Concerns were raised by the Planning Service at that time
with regard to the extent of the footprint of the development within the site and the
consideration of the existing slope of the site as part of the development brought
forward.  It was not considered that the development proposed at that time was suited
to the site in question, particularly given the constraints posed by the levels within the
site.  As such, the applicants chose to withdraw the application from further
consideration. 
6.6 Subsequent to this, further discussions were undertaken between the applicants and
the Planning Service to seek an improved submission in respect of the site.  As a result
of these discussions the current, revised scheme has been brought forward for
consideration.  It is noted that, although the number of dwellings now proposed has
increased from 18 to 19, the overall footprint of the development has been significantly
reduced and the proposed houses have been designed in a manner that takes account
of the levels within the site.  The proposed development is now considered to be
appropriate in terms of design and style to the site and also allows for the provision of
substantial landscaping at the site boundaries and in particular, adjacent to Newlands
Road, ensuring that there would be no adverse impact on residential properties to the
west of Newlands Road or on the wider local area.  While the surrounding area
predominantly comprises two storey dwellings it is noted that, as part of the design of
the development to accommodate the existing slope within the site, some three storey
elevations would be formed in this instance.  However, it is considered that, given the
level changes that exist within the site, the proposed housetypes are appropriate and
would allow the site to be developed without requiring significant regrading works to
be undertaken to accommodate the development. 
6.7 In terms of access and road safety considerations it is noted that the applicants
propose to undertake road improvement works on Newlands Road in addition to the
extension of the existing footpath on Newlands Road south to the development site. 
215

Page 216

Off-street car parking is also proposed to be put in place to serve each of the
dwellinghouses within the proposed development.  Further to discussions and minor
revisions to the original proposals to ensure compliance with relevant Council
standards the Council’s Roads and Transportation Services have confirmed their
satisfaction with the access provisions associated with the proposed development
subject to conditions that would be attached to any consent issued.  Similarly, the
Council’s Environmental Services have confirmed that they have no objection to the
proposed development subject to a condition relating to dust management on site,
which would also be attached to any consent granted. 
6.8 With regard to the consideration of climate change issues, it is noted that the site is
located within a designated residential area, in relatively close proximity to local
services, with pedestrian facilities proposed to be put in place to minimise car use
where possible.  In addition, a condition would be attached to any consent issued
requiring appropriate provision to be made for electric vehicle charging points within
the site.  As such, it is considered that this site represents a sustainable location that
can be developed in a manner that makes a positive contribution in terms of climate
change considerations. 
6.9 In terms of amenity and open space provisions it is noted that the significantly reduced
footprint of the development, relative to the proposals previously brought forward for
consideration, allows for the provision of ample landscaped and open space areas
within the site.  A tree survey which has been submitted in support of the application
reflects the consideration previously given to trees on site as part of the previous grant
of consent for the residential development of the site in 2015.  In this regard it has
been confirmed that it remains the case that many of the existing trees within the site
are in poor condition and unfortunately require to be removed.  However, similarly to
the previous consent granted in respect of this site in 2015, a tree belt along the
southern boundary of the site is. considered to remain in good condition and can also
provide a natural boundary between the application site and the adjacent Green
Network open space area at this location.  As such, the development has been
designed to allow the retention of these trees and any consent issued would be
appropriately conditioned to ensure that the trees in question would be retained as
part of the proposed development of the wider site. 
6.10 In terms of the consideration of ecological matters an ecology survey has been
undertaken which has confirmed that, subject to adherence to the recommendations
of the associated report, there would be no unacceptable impact on protected species
or other biodiversity considerations resulting from the proposed development.  Any
consent issued would be conditioned to ensure that the requirements of the report are
fully adhered to as part of the development of the site.  Given all of the above and
following a detailed assessment of the proposals submitted, the view is taken that the
proposals represent an appropriate development of the site, would not have any
significant amenity impact and fully comply with the development management
considerations set out in Policies 2, 5, 14, NHE14 and DM1 as well as in the Council’s
Residential Design Guide. 
6.11 Taking all of the above into account, it is considered that the detailed proposals
brought forward represent a high-quality residential development that would suitably
integrate with the existing built and natural environment at this location, would support
appropriate and sustainable connectivity to public facilities and would not result in any
significant adverse amenity, environmental or other impacts.  It is therefore concluded
that the proposed development fully complies with the relevant provisions of the South
Lanarkshire Local Development Plan 2 (adopted 2021), with specific regard to the
provisions of Policies 2, 3, 5, 11, 14, NHE14 and DM1 and with the Council’s
216

Page 217

Residential Design Guide.  It is therefore recommended that planning permission is
granted for the proposed development, subject to the attached conditions. 
7 Reasons for Decision
7.1 The proposals would have no significant adverse impact on amenity, public safety or
the local environment and comply with the provisions of Policies 2, 3, 5, 11, 14, DM1
and NHE14 of the South Lanarkshire Local Development Plan 2 (adopted 2021) and
with the Council's Residential Design Guide. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 30 September 2022 
Previous references
 Planning application EK/14/0347
 Planning application P/18/1792
 Planning application P/21/2146 
List of background papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letter dated 14 July 2022
► Consultations
Roads Development Management Team 16.09.2022
Environmental Services 23.08.2022
Roads Flood Risk Management 24.08.2022
Scottish Water 18.07.2022
Estates Services - Housing and Technical Resources 19.07.2022 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Declan King, Planning Officer, Montrose House, 154 Montrose Crescent, Hamilton, ML3 6LB
Phone: 07551 843 111   
Email: declan.king@southlanarkshire.gov.uk  
217

Page 218

Detailed planning application 
Paper apart – Application number: P/22/0923 
Conditions and reasons
01. That before any development commences on site or before any materials are ordered
or brought to the site, details and samples of all materials to be used as external
finishes on the development shall be submitted to and approved by the Council as
Planning Authority.  The development shall thereafter be carried out in accordance
with the approved details to the satisfaction of the Council as Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
02. That before development starts, full details of the design and location of all fences and
walls, including any retaining walls, to be erected on the site shall be submitted to and
approved by the Council as Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
03. That before any of the dwellinghouses situated on the site upon which a fence is to be
erected is occupied, the fence or wall for which the permission of the Council as
Planning Authority has been obtained under the terms of Condition 2 shall be erected
and thereafter maintained to the satisfaction of the Council.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
04. That before any work commences on the site, a scheme of landscaping shall be
submitted to the Council as Planning Authority for written approval, and it shall include: 
(a) an indication of all existing trees and hedgerows plus details of those to be retained
and measures for their protection in the course of development; 
(b) details and specification of all trees, shrubs, grass mix, etc., including, where
appropriate, the planting of fruit/apple trees; 
(c) details of any top-soiling or other treatment to the ground; 
(d) sections and other necessary details of any mounding, earthworks and hard
landscaping; 
(e) proposals for the initial and future maintenance of the landscaped areas; 
(f) details of the phasing of these works; and no work shall be undertaken on the site
until approval has been given to these details.   
Reason: To ensure the appropriate provision of landscaping within the site. 
05. That the approved landscaping scheme shall be completed to the satisfaction of the
Council as Planning Authority during the first available planting season following
occupation of the building(s) or completion of the development hereby approved,
whichever is the sooner, and shall thereafter be maintained and replaced where
necessary to the satisfaction of the Council.   
Reason: In the interests of the visual amenity of the area. 
06. That no trees within the application site shall be lopped, topped, pollarded or felled, or
otherwise affected, other than those shown on the drawings hereby approved as being
removed, without the prior written consent of the Council as Planning Authority. 
218

Page 219

Reason: In the interests of amenity and to ensure the protection and maintenance of
the existing trees within the site. 
07. That, unless otherwise agreed in writing with the Council as Planning Authority,
provision shall be made for electrical charging points within the development for motor
vehicles and mobility scooters.  Prior to any works commencing on site details of the
proposed arrangements shall be submitted and agreed in writing with the Council as
Planning Authority.  Thereafter the scheme shall be implemented and maintained to
the satisfaction of the Council as Planning Authority.   
Reason: To ensure the provision of appropriate facilities on site. 
08. Prior to commencement of the development hereby approved, details of measures to
facilitate the provision of full fibre broadband to serve the development, including
details of appropriate digital infrastructure and a timescale for implementation, shall be
submitted to and approved in writing by the Council as Planning Authority, unless
otherwise agreed in writing with the applicant.  The approved measures shall thereafter
be carried out in accordance with the agreed implementation timescale.   
Reason: To ensure the provision of digital infrastructure to serve the development. 
09. That no development shall commence until drainage and flood risk details to include
signed appendices A, B, C, D and E are submitted to and approved in writing by the
Planning Authority.  The development shall not be occupied until the surface drainage
works and any required flood mitigation works have been completed in accordance
with the details submitted to and approved by the Council as Planning Authority.     
Reason: To ensure that the disposal of surface water from the site is dealt with in a
safe and sustainable manner, to return it to the natural water cycle with minimal
adverse impact on people and the environment and to alleviate the potential for on-
site and off-site flooding. 
10. That the recommendations of the tree survey undertaken in respect of the site by Tyler
Grange and dated March 2021 shall be adhered to at all times on site, unless otherwise
agreed in writing with the Council as Planning Authority through the submission of
appropriate justification.   
Reason: To ensure the protection of all trees that are proposed to be retained within
the site. 
11. That the recommendations of the ecological survey undertaken in respect of the site
by Tyler Grange and dated December 2021, including the undertaking of a further
detailed protected species survey prior to the commencement of works on site, shall
be adhered to at all times, unless otherwise agreed in writing with the Council as
Planning Authority through the submission of appropriate justification.   
Reason: To ensure the appropriate protection of ecological interests within the site. 
12. That, prior to development commencing on site, a scheme for the control and
mitigation of dust shall be submitted to and approved in writing by the Council as
Planning Authority.  No changes to the approved scheme shall take place unless
agreed in writing by the Council as Planning Authority.  The scheme shall thereafter
be implemented in accordance with a programme to be agreed in writing with the
Council as Planning Authority. 
Reason: In the interests of environmental amenity. 
219

Page 220

13. That, prior to the commencement of works on site, a passing place shall be provided
on Newlands Road between the proposed access to the development and the 5.5m
wide section of carriageway at the Bellway Homes development.  Additionally, prior to
the commencement of works on site, these upgrading works shall also incorporate the
provision of a 2m wide footway that connects to the existing footway network along
with pedestrian crossing points, drainage & street lighting, all to the satisfaction of the
Council as Roads and Planning Authority unless otherwise agreed. 
Reason: To ensure that the site can be appropriately accessed from the public road
and footpath network. 
14. That the maximum gradient, rising or falling, on the final approach of any minor road
at a junction shall be limited to 2% for a minimum distance of at least 12m from the
major road. 
Reason: In the interest of road safety. 
15. At the junction of the access to the site with Newlands Road vehicular visibility splays
of 2.4m x 43m shall be provided before any dwellinghouse within the development
hereby approved is completed or brought into use.  Within these splays nothing over
900mm in height, i.e. trees, shrubs walls etc. is permitted.  No driveways shall be
located within this area. 
Reason: In the interest of road safety. 
16. At all driveway accesses a vehicular visibility splay of 2m x 20m shall be provided,
(only if traffic calming features are provided, otherwise the visibility will be 2m x 35m). 
A pedestrian visibility splay of 2.4m x 2.4m, (measured from the heel kerb of the
footway) shall be provided.  These visibility splays shall be put in place before the
dwellinghouse is occupied and within these splays nothing over 900mm in height, i.e.
trees, shrubs walls etc. is permitted. 
Reason: In the interest of road safety. 
17. That the parking provision for a 1-bedroom property shall be 1 space, for a 2/3-
bedroom property 2 spaces and for a property with 4 bedrooms or more 3 spaces are
required.  The driveway dimensions shall be detailed as per the National Roads
Development Guide, 3m x 12m for double length, 6m x 6m for double width, and for
three spaces a combination of these.  These dimensions exclude pedestrian access. 
To allow a garage to count as a space it will have to meet the minimum dimensions as
per the National Roads Development Guide, an internal minimum size of 3m x 7m. 
The locations and dimensions of these spaces shall be submitted on a plan to and
approved by the Council as Planning and Roads Authority prior to the commencement
of any works on site and shall be put in place in respect of each dwellinghouse before
that dwellinghouse is completed or brought into use. 
Reason: In the interest of road safety. 
18. That the first two metres of each driveway shall be surfaced, trapped and sealed to
prevent any deleterious material or water from leaving the driveway and entering the
carriageway, before the dwellinghouse to which the driveway relates is completed or
brought into use. 
Reason: In the interest of road safety. 
220

Page 221

19. That, prior to commencement of works on site, a plan shall be submitted to and
approved by the Council as Roads and Planning Authority showing the details of all
driveway gradients associated with the development hereby approved.  No driveway
shall have a gradient greater than 10% and the development shall thereafter be carried
out in accordance with the approved details, with the driveway for each dwellinghouse
completed to the satisfaction of the Council prior to the completion or occupation of
the associated dwellinghouse. 
Reason: In the interest of road safety. 
20. That no part of the proposed adoptable carriageway or footway / service strip shall be
in retention, be either a slope with a gradient greater than 1 in 2 or a structure. 
Additional information regarding the retaining wall shall be submitted to and approved
by the Council as Roads and Planning Authority prior to the commencement of any
works on site.  This information shall satisfactorily demonstrate that the retaining wall
has no influence on the proposed adopted road, including the footway / service strip. 
Information regarding future maintenance of the retaining wall shall also be submitted
to and approved by the Council as Roads and Planning Authority.  The approved works
shall thereafter be put in place on site to the satisfaction of the Council as Roads and
Planning Authority prior to the completion or occupation of any dwellinghouse within
the development, unless otherwise agreed in writing with the Council. 
Reason: In the interest of road safety. 
21. That, prior to works commencing on site, a dilapidation survey of Newlands Road shall
be undertaken by the developers with an Officer of the Council’s Roads Service. 
Thereafter, any remedial works required by the Roads Service at the completion of the
development shall be repaired at the applicants expense.
Reason: In the interest of road safety.
22. That, prior to the commencement of any works on site, the following details shall be
submitted to and approved by the Council as Roads and Planning Authority, including
the provision of plans as appropriate:
- The provision of a suitable site drainage system to prevent surface water
flowing onto the public road;
- The provision of appropriate cleaning systems within the site to ensure that mud
and debris is not deposited on the public road;
- The provision of wheel wash facilities associated with the construction work
hereby approved;
- The provision of a turning area to allow all vehicles to access and exist the site
in forward gears;
- The provision of vehicle parking on site to accommodate all site
staff/operatives.
Thereafter, the approved works shall be put in place on site prior to the
commencement of the development and maintained to the satisfaction of the Council
throughout the construction phase.
Reason: In the interest of road safety.  
221

Page 222

222

Page 223

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Application no.
Planning proposal:
P/22/0927
Erection of 12 flats with associated vehicular access, parking and
landscaping 
1 Summary application information
Amended
•  Application type:  Detailed planning application
•  
Applicant:  Procast Group 
•  Location:  Low Waters Miners Welfare and Social Club
4 Alness Street
Hamilton
ML3 6RU 
[1purpose]
2 Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) Grant detailed planning permission (subject to conditions) based on conditions
attached.
[1recs]
2.2 Other actions/notes 
(1) The Planning Committee has delegated powers to determine this application. 
3 Other information
♦ Applicant’s Agent: Framed Estates
♦ Council Area/Ward: 19 Hamilton South
♦ Policy Reference(s): South Lanarkshire Local Development Plan 2
(adopted 2021)
Policy 1 - Spatial Strategy
Policy 2 – Climate Change
Policy 5 - Development Management and Place
Making 
Policy 7 - Community Infrastructure Assessment
Policy 11 - Housing
Policy 15 - Travel and Transport 
Policy 16 - Water Environment and Flooding
Policy DM1 - New Development Design
Policy SDCC2 - Flood Risk
Policy SDCC3 - Sustainable Drainage Systems 
Policy SDCC4 - Sustainable Transport
17
223

Page 224

Policy DM15 - Water Supply
Policy NHE18 - Walking, Cycling and Riding
Routes
Policy NHE20 - Biodiversity 
♦   Representation(s): 
► 1  Objection Letter
► 0  Support Letters
► 1  Comment Letter 
♦   Consultation(s):   
Community and Enterprise Resources - Play Provision Community
Contributions 
Roads Development Management Team 
Environmental Services 
Scottish Water 
SportScotland 
224

Page 225

Planning Application Report
1 Application Site
1.1 The application relates to an area of land located on Alness Street on the southern
side of Hamilton.  The site has been in use as a bowling green associated with the
adjoining Low Waters Miners Welfare and Social Club for the best part of 100 years. 
The site extends to approximately 0.25 hectares.  The site is essentially square
shaped and mainly flat with relatively level access to the adjoining properties and
roads.  The site is bounded on two sides by existing roads, Alness Street and Eliot
Crescent, with adjacent residential properties located to the north, south and west,
and the Low Waters Miners Welfare and Social Club located directly adjacent to the
east. 
2 Proposal(s)
2.1 This is a detailed planning application for the erection of 12 flats with associated
vehicular access, parking and landscaping.  The proposal comprises two blocks of six
cottage flats arranged over two floors, half of which would be wheelchair accessible. 
All of the flats are two-bedroom dwellings.  The proposed blocks are of contemporary
design incorporating traditional ridged roofs finished in grey concrete roof tiles with
solar panels.  The exterior walls would be finished in a mix of buff facing brick and grey
zinc style cladding.  Throughout the development bay windows would be highlighted
in cladding.  The proposal has been designed to reflect the established scale and
massing of buildings surrounding the site, most of which are two storey flatted blocks
with dual pitched and often hipped roofs.  The two blocks would enclose an area of
private communal amenity space creating a three-sided perimeter block.  The blocks
would be fronted by a number of parking spaces (27 in total) directly accessed via
Alness St.  The mirrored blocks would allow the development to address the two street
frontages. 
2.2 The submitted supporting information advises that the Low Waters Miners Welfare and
Social Club disposed of the bowling green in 2021 when the club and green were
repossessed, all associated outbuildings relating to the bowling club were removed
from the site in March 2022. 
3 Background
3.1 Local Plan Background
3.1.1 In terms of local plan policy, the application site is designated as a proposed housing
site in the adopted South Lanarkshire Local Development Plan 2.  The relevant
policies in terms of the assessment of the application are Policy 1 - Spatial Strategy,
Policy 2 - Climate Change, Policy 5 - Development Management and Place Making,
Policy 7 - Community Infrastructure Assessment, Policy 11 - Housing Land, Policy 15
- Travel and Transport, Policy 16 - Water Environment and Flooding, Policy DM1 -
New Development Design, Policy DM15 - Water Supply, Policy SDCC2 - Flood Risk
and Policy SDCC3 - Sustainable Drainage Systems of the adopted South Lanarkshire
Local Development Plan 2.  The content of the above policies and documents and
how they relate to the proposal is assessed in detail in Section 6 of this report. 
3.2 Relevant Government Advice/Policy
3.2.1 In terms of residential development, Scottish Planning Policy (SPP) requires Councils
to maintain a five year supply of effective housing land. Planning Authorities are also
required to promote the efficient use of land by directing development towards sites
within existing settlements, where possible, in order to make effective use of existing
infrastructure and service capacity.  
225

Page 226

3.3 Planning Background
3.3.1 There is no recent planning history in this instance. 
4 Consultation(s)
4.1 SportScotland – have no objections to the application.  Bowls Scotland have advised
that, despite best efforts, the club will be closing with the adjacent building having been
sold to developers 2 years ago.  In 2021, Low Waters Miners Welfare Bowling Club
had 18 male and 8 female members.  It has been advised that there are several other
clubs nearby which would have capacity for new members.  Given this,
SportScotland’s view is that for bowling greens, there is a clear excess of provision in
the area, and that the loss of the site can be justified in terms of its use as an outdoor
sports facility for bowls.  The proposal would satisfy Scottish Planning Policy and
would comply with Policy 13 in relation to the loss of outdoor sports facilities.  This
response relates to the use of the area as an outdoor sports facility, in this case a
bowling green.  Their remit does not extend to its wider greenspace value, which is for
the Council as planning authority to assess.
Response:-  Noted.  However, it should also be noted in relation to Policy 13 - Green
Network and Greenspace of the adopted Local Development Plan that the application
site is not covered by the Green Network, therefore, this policy is not relevant in this
instance. 
4.2 Environmental Services – have no objections to the application.
Response:-  Noted. 
4.3 Roads Development Management Team – have no objections to the application.
Response: Noted. 
4.4 Scottish Water – have no objections to the application and have advised that there is
currently sufficient capacity to service the proposed development at the CAMPS Water
Treatment Works and the Hamilton Waste Water Treatment Works.
Response:-  Noted. 
4.5 Community and Enterprise Resources - Play Provision Contributions – no
contribution required for an affordable housing development.
Response:-  Noted. 
5 Representation(s)
5.1 Statutory neighbour notification procedures were undertaken and two letters of
representation have been received in relation to the application.  The matters raised
in the representations are summarised as follows:- 
(a) I feel we will lose the little green space we have and don’t feel every space
needs to be built upon especially the amount of flats that they want to
squeeze in.  The height of the elevation will undoubtedly affect our
daylight and cause shadowing and will devalue our property with 12 flats
opposite.  I don’t always feel just because a company wants to build
residential dwellings that it is beneficial to the community and hope the
committee will concur as there are offices/gym/bar and a community hall
which I believe the Scouts now own, making the area too congested.
Response: The application site is designated as a proposed housing site in the
adopted South Lanarkshire Local Development Plan 2 and SportScotland have
raised no adverse comments in relation to the loss of the former bowling green. 
226

Page 227

It is considered that the buildings have been designed and positioned within the
site appropriately to ensure that it should have no significant adverse impact on
any existing dwellings in terms of overshadowing or loss of daylight.  Loss of
value is not a material planning consideration. 
(b) In the new development there are 4 main entrances on Eliot Crescent with
no parking directly outside these entrances.  I am aware that parking has
been provided via Alness Street, but I am concerned that the residents of
the 4 flats with entrances on Eliot Crescent will park outside their doors.
The road on Eliot Crescent is narrow, if cars were parked on the road
emergency vehicles and the refuse collection lorry would have difficulty
passing by.  I have difficulty accessing my driveway on the currently rare
occasions should a car be parked opposite.  I envisage this would be an
everyday occurrence with 4 entrances opposite my driveway.  I note that
one electric car charger has been allocated for 12 flats.  This is not going
to be sufficient for potentially 24 cars (2 cars per flat) when all cars will be
electric.  It would be more cost effective to provide a greater number of
charging points at this early design stage than to install further chargers
in the future.
Response: Roads and Transportation Services are satisfied that the proposal
raises no access, parking or road safety issues.  In relation to electric vehicle
charging facilities, this can be addressed through an appropriately worded
condition. 
(c) I note that the development is to be clad in zinc.  There are no buildings
in the area clad in zinc.  The development would be more in keeping with
the surrounding properties if it was completely rough cast to match all the
existing buildings.
Response: Whilst the proposed buildings are contemporary in their design and
finish materials it is considered that they are appropriate for their location and
that they will not be out of keeping with the existing development in the
surrounding area. 
(d) I am disappointed to note that all the mature hedges on Alness Street and
Eliot Crescent will be destroyed.  These hedges are probably as old as the
bowling green and provide nesting sites for birds and homes for a large
variety of insects.  Could some of the hedges be saved? 
Response: The hedge bounding the site is to be removed to facilitate the
development.  However, the hedge is not protected by any tree preservation
order and any planning consent granted would be conditioned to ensure the
submission of an appropriate landscaping scheme for the Council’s
satisfaction. 
(e) Please note that as of 15 July 2022 I have not received a neighbourhood
notice.  I was made aware of the development by someone else seeing, by
chance, an article online.
Response: Due to a technical error the property referred to above at 45 Eliot
Crescent was not neighbour notified when the application was registered. 
However, this matter has been rectified with the property being formally
neighbour notified on 6 September 2022. 
5.2 These letters are available for inspection on the planning portal.  
227

Page 228

6 Assessment and Conclusions
6.1 The applicant seeks detailed planning permission for the erection of 12 flats with
associated vehicular access, parking and landscaping.  The determining issues in
consideration of this application are its compliance with national and local plan policy
and its impact on the amenity of adjacent properties and on the local road network. 
6.2 In terms of national planning policy, Scottish Planning Policy (SPP) requires Councils
to maintain a five year supply of effective housing land.  Planning Authorities are also
required to promote the efficient use of land by directing development towards sites
within existing settlements, where possible, in order to make effective use of existing
infrastructure and service capacity. 
6.3 In general land use and policy terms the principle of residential development at this
location is considered to be acceptable as the application site is designated for
residential use in the adopted South Lanarkshire Local Development Plan 2.  The
proposal involves the re-use of a former bowling green which raised no adverse
comments from SportScotland in relation to the loss of outdoor sports facilities and
who have also advised that the proposal would satisfy the terms of SPP.  The proposal
promotes development in a sustainable location which would be accessible by public
transport, with bus routes located on the nearby Low Waters Road and in terms of
permeability, the development would be well integrated into existing walking and
cycling networks.  It is, therefore, considered that the proposal is in accordance with
national planning policy. 
6.4 In terms of local plan policy, the application site is designated as a proposed housing
site in the adopted South Lanarkshire Local Development Plan 2.  The relevant
policies in terms of the assessment of the application are Policy 1 - Spatial Strategy,
Policy 2 - Climate Change, Policy 5 - Development Management and Place Making,
Policy 7 - Community Infrastructure Assessment, Policy 11 - Housing Land, Policy 15
- Travel and Transport, Policy 16 - Water Environment and Flooding, Policy DM1 -
New Development Design, Policy DM15 - Water Supply, Policy SDCC2 - Flood Risk
and Policy SDCC3 - Sustainable Drainage Systems of the adopted South Lanarkshire
Local Development Plan 2. 
6.5 The application site is designated as a proposed housing site under the terms of Policy
11, therefore, the principle of the proposal is acceptable.  As the proposal raises no
policy issues the application conforms with the terms of Policy 11. 
6.6 Policies 1 and 2 encourage sustainable economic growth and regeneration, a move
towards a low carbon economy, the protection of the natural and historic environment
and mitigation against the impacts of climate change.  In line with these policies, the
proposal involves the development of a previously used site which is located in a
sustainable location within Hamilton and where the principle of residential use is
considered to be acceptable.  The site benefits from opportunities for trips by public
transport with bus routes located on the nearby Low Waters Road and the
development would be well integrated into existing walking and cycling networks.  The
site is also located within an acceptable distance to commercial services such as retail,
leisure, schools, health care etc.  It is considered that the development of the site
would result in an attractive and vibrant addition to neighbouring development. 
Furthermore, the proposed dwellings would be designed to the latest technical
standards in terms of insulation, air tightness and energy ratings.  It is, therefore,
considered that the proposal meets the terms of the above policies.  
228

Page 229

6.7 In terms of the detailed design of the development, Policies 5 and DM1 generally
require new development to have due regard to the layout, form, design and local
context of the area and to promote quality and sustainability in its design.  In this
instance, it is considered that the proposed layout for the development is acceptable
and that it meets the main standards set out in the Council’s Residential Design Guide
particularly in relation to window to window distances, amenity open space and car
parking.  The proposed two storey flatted dwellings are of modern design with a
suitably high standard of external finishing materials and it is considered that the
development will not be out of keeping with the existing residential development in the
surrounding area.  It is considered that the buildings have been designed and
positioned within the site sufficiently to ensure that they should have no significant
adverse impact on any adjacent existing dwellings in terms of loss of light and
overshadowing and likewise, in terms of overlooking and loss of privacy.  It is also
considered that sufficient levels of amenity space and car parking are being provided
for the dwellings.  Overall, the site is very flat with relatively level access to the
adjoining properties and roads and the flat topography of the site facilitates the
proposed ridge heights to match those of the existing buildings in the surrounding local
context.  The proposed access arrangements have been assessed and are considered
to be acceptable by the Council’s Roads and Transportation Service.  In view of the
above, it is considered that the proposed development would relate satisfactorily to
adjacent residential development in terms of its scale, design and materials and that
the character and amenity of the area would not be impaired by reason of traffic
generation, parking or visual intrusion.  The proposal is, therefore, considered to be in
accordance with the terms of Policies 5 and DM1. 
6.8 With regard to Policy 7, the applicant has advised that the development is intended
to be constructed for affordable housing.  Consequently, no contributions are required
and it is, therefore, considered that the proposal meets the terms of the above policy. 
6.9 Policy 15 seeks to ensure that development considers, and where appropriate,
mitigates the resulting impacts of traffic growth and encourages sustainable transport
options that take account of the need to provide proper provision for walking, cycling
and public transport.  In this regard, the site is accessible by public transport with bus
routes located on the nearby Low Waters Road.  In terms of permeability, the
development would be well integrated into existing walking and cycling networks. 
Furthermore, Roads and Transportation Services are satisfied that the proposal raises
no access, parking or road safety issues.  It is, therefore, considered that the proposal
complies with Policy 15. 
6.10 The proposal has been assessed by the relevant consultees in terms of Policies 16,
DM15, SDCC2 and SDCC3.  With regard to flooding and surface water drainage, no
adverse comments were raised by Roads and Transportation Services subject to the
Council’s Sustainable Urban Drainage Systems (SUDS) design criteria being satisfied
through the completion of the standard self-certification documents.  Scottish Water
have also confirmed that they have no objections to the application and any consent
granted would include a condition to ensure that no dwellings are occupied until the
site is served by a sewerage scheme constructed in accordance with Scottish Water
standards.  It is, therefore, considered that the proposal is in accordance with the terms
of the above policies. 
6.11 In summary, it is considered that the application conforms with both national and local
plan policy and that the proposal raises no significant environmental or infrastructure
issues.  It is therefore recommended that the application be granted subject to the
conditions listed.  
229

Page 230

7 Reasons for Decision
7.1 The proposal raises no amenity, environmental or infrastructure issues and complies
with Policies 1, 2, 5, 7, 11, 15, 16, DM1, SDCC2, SDCC3, SDCC4 and DM15 of the
adopted South Lanarkshire Local Development Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 30 September 2022 
Previous References
 None 
List of Background Papers
► Application form
► Application plans
► South Lanarkshire Local Development Plan 2 (adopted 2021)
► Neighbour notification letters dated 4 July 2022 and 6 September 2022 
► Consultations
Community and Enterprise Resources - Play Provision
Community Contributions 
Roads Development Management Team 27.07.2022
Environmental Services 07.07.2022
Scottish Water 06.07.2022
SportScotland 15.07.2022 
► Representations           Dated:
Grace Clarke, By Email  14.07.2022 
Mrs Fiona Moran, 45 Eliot Crescent, Hamilton, ML3 6SP  15.07.2022 
Contact for further information
If you would like to inspect the background papers or want further information, please
contact:- 
Jim Blake, Planning Officer, Floor 6, Council Offices, Almada Street, Hamilton, ML3 0AA
Phone: 07551 840 831   
Email: jim.blake@southlanarkshire.gov.uk  
230

Page 231

Detailed planning application 
Paper apart – Application number: P/22/0927 
Conditions and reasons 
01. That before any development commences on site or before any materials are ordered
or brought to the site, details and samples of all materials to be used as external
finishes on the development shall be submitted to and approved by the Council as
Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
02. That before development starts, full details of the design and location of all fences and
walls, including any retaining walls, to be erected on the site shall be submitted to and
approved by the Council as Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
03. That before any of the dwellinghouses situated on the site upon which a fence is to be
erected is occupied, the fence or wall for which the permission of the Council as
Planning Authority has been obtained under the terms of Condition 2, shall be erected
and thereafter maintained to the satisfaction of the Council.   
Reason: To ensure the development is satisfactory in appearance and to maintain the
visual quality of the area. 
04. That no dwelling shall be occupied until the site is served by a sewerage scheme
constructed in accordance with Scottish Water standards and as approved by the
Council as Planning Authority in consultation with Scottish Water as Sewerage
Authority. 
Reason: To ensure the provision of a satisfactory sewerage system. 
05. That no development shall commence until details of surface water drainage
arrangements have been submitted to and approved in writing by the Council as
Planning Authority; such drainage arrangements will require to comply with the
principles of sustainable urban drainage systems and with the Council's Sustainable
Drainage Design Criteria and shall include signed appendices as required.  The
development shall not be occupied until the surface drainage works have been
completed in accordance with the details submitted to and approved by the Council as
Planning Authority.   
Reason: To ensure that the disposal of surface water from the site is dealt with in a
safe and sustainable manner, to return it to the natural water cycle with minimal
adverse impact on people and the environment and to alleviate the potential for on-
site and off-site flooding. 
06. That no further changes in ground levels within the site shall take place without the
prior written consent of the Council as Planning Authority.   
Reason: In the interests of amenity and in order to retain effective planning control. 
231

Page 232

07. That before the development hereby approved is completed or brought into use, all of
the parking spaces shown on the approved plans shall be laid out, constructed and
thereafter maintained to the specification of the Council as Planning and Roads
Authority.   
Reason: To ensure the provision of adequate parking facilities within the site. 
08. That prior to any works commencing on site, full details of electric vehicle charging
(EVC) facilities within the site shall be submitted to and approved by the Council as
Planning and Roads Authority.  Once approved the agreed EVC provision shall be
installed, commissioned, and maintained in accordance with the approved plans and
specifications prior to that dwelling which it serves being occupied. 
Reason: These details have not been submitted or approved. 
09. That prior to commencement of the development hereby approved, details of
measures to facilitate the provision of full fibre broadband to serve the development,
including details of appropriate digital infrastructure and a timescale for
implementation, shall be submitted to and approved in writing by the Council as
Planning Authority, unless otherwise agreed in writing with the applicant.  The
approved measures shall thereafter be carried out in accordance with the agreed
implementation timescale.   
Reason: To ensure the provision of digital infrastructure to serve the development. 
10. For the avoidance of doubt, the development hereby approved shall consist of social
housing only, operated by a Registered Social Landlord unless otherwise agreed in
writing with the Planning Authority. 
Reason: In order to retain effective planning control. 
232

Page 233

233

Page 234

234

Page 235

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Subject South Lanarkshire Local Development Plan 2
Supporting Planning Guidance:
 Community Infrastructure Assessment 
1. Purpose of Report
1.1 The purpose of the report is to:-
Amended
♦ inform the Committee of the consultation carried out on the draft Supporting
Planning Guidance (SPG) on Community Infrastructure Assessment related to
the South Lanarkshire Local Development Plan 2 (SLLDP2)
♦ seek Committee approval for the proposed SPG, as set out in the Appendix, and
thereafter for it to be adopted as the Council’s agreed planning position 
[
2. Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Supporting Planning Guidance for Community Infrastructure
Assessment, as set out in the appendix to the report, be approved; and
(2) that the Head of Planning and Regulatory Services be authorised to undertake
the appropriate procedures and to make drafting and technical changes to the
Supporting Planning Guidance prior to its publication for consultation.
[1re
3. Background 
3.1 The Planning Committee on 1 December 2020 agreed to carry out the necessary steps
to adopt the proposed South Lanarkshire Local Development Plan 2 (SLLDP2).  The
Plan was submitted to Scottish Ministers in February 2021 for them to advise of the
Council’s intention to adopt the Plan and notice was received in March that adoption
could proceed.  The SLLDP2 was subsequently adopted in April 2021. 
3.2 Members may also recall that when the proposed SLLDP2 was approved it was
highlighted that, in order to respond to the need for development plans to be concise
and focused, further detailed information, advice and guidance would be contained in
Supporting Planning Guidance.  Circular 6/2013 – Development Planning states that
planning authorities may issue non-statutory planning guidance without having to
comply with the procedures involved in the production of statutory Supplementary
Guidance (SG). Non-statutory planning guidance may be used to provide detail on a
range of subject areas.  This form of guidance does not form part of the Development
Plan but adoption of it by the Council gives it a formal status, meaning that it will be a
material consideration in decision making on planning applications. 
3.3 The purpose of the Supporting Planning Guidance is to support the policy approach
already contained within the adopted SLLDP2 by providing more detailed guidance
and advice.  The SPG expands on the policy direction set out in SLLDP2 and translates
18
235

Page 236

this into detailed guidance.  The purpose of each SPG is solely to reinforce and support
the terms of the policies already contained in the adopted SLLDP2.  The SPG does
not alter either the aims or purposes of the policies. 
3.4 On 15 February 2022, the Planning Committee approved draft SPG on seeking
developer contributions from developers in new developments and, thereafter, to carry
out consultation on the document.  The draft document was informed by a review of
the extant Supplementary Guidance on this subject and research carried out on the
approach used by other planning authorities.  This is described in more detail in section
5 below. 
4. Legislative and Policy Context 
4.1 Community Infrastructure Assessment is the process whereby the Council can seek
financial contributions from developers where development proposals require capital
or other works to enable the development to proceed by mitigating the impact on
essential infrastructure.  This may involve:- 
 The direct provision of works or facilities by developers
 A financial contribution to fund off site provision
 A combination of these 
Developer contributions are not like other funds which are available for local
communities to bid for.  They have to be sought in line with government policy and
must directly relate to the impact the development would have on an area.  It is also
not appropriate for developers to be asked to pay to address existing shortfalls in the
provision of Council facilities or services nor address defects such as structural repairs
to existing buildings which are not linked to the development. Policy 7 – Community
Infrastructure Assessment in SLLDP2 sets the high level policy context on this issue.
It limits the areas in which contributions may be sought to the following:- 
 Affordable Housing
 Roads and Transportation
 Education provision
 Recreation
 Council-owned community facilities 
4.2 The legislative basis for seeking developer contributions is found at section 75 of the
Town and Country Planning (Scotland) Act 1997.  This allows the Council to enter into
a planning obligation to restrict or regulate the development or use of land including a
requirement to make payments where appropriate.  The obligation is registered in the
Land Register of Scotland which means it is enforceable by the planning authority
against the owner of the land and successors in title. 
4.3 More detailed guidance is set out in Circular 3/2012 - Planning Obligations and Good
Neighbour Agreements.  The Circular sets out 5 tests that planning obligations are
required to meet to be lawful.  They should:- 
 be necessary to make the proposed development acceptable in planning terms
 serve a planning purpose 
 relate to the proposed development either as a direct consequence of the
development including the cumulative impact of development in the area 
 fairly and reasonably relate in scale and kind to the proposed development
 be reasonable in all other respects    
236

Page 237

4.4 It goes on further that consideration should be given to the economic viability of
proposals when deciding the form and scale of contributions as an obligation may have
a financial impact for developers and make proposals uneconomic.  Cash flow can
also be affected in cases where substantial sums of money have to be paid either
before the development gets under way or at an early stage in construction.  This can
be addressed by agreeing phased payments.  The Council asks for the developer to
undertake a financial viability assessment for the development taking account of the
level of contributions being asked for.  This allows a reasonable and proportionate
approach to the level of contributions expected and the timing of the works being
carried out/making of payments.  The aim is to strike a balance between setting
contributions levels so that they address any direct impact of the development and
ensuring the proposal remains viable.  Once submitted, the viability assessment is
reviewed by an independent assessor.  This will include reference to build costs and
other abnormal costs (for example the remediation of contaminated land). 
5. Supplementary Planning Guidance – Community Infrastructure Assessment 
5.1 The draft document approved by Committee in February 2022 included the following
changes to the previous guidance on this matter. 
5.2 Reducing threshold for seeking contributions
Contributions are currently sought from housing developments comprising 20 units or
more.  A review of this figure has been undertaken in recognition that smaller
developments can have an impact on existing infrastructure and service provision. 
This included looking at the approach of other Planning Authorities which found that
South Lanarkshire Council is the only one with a figure of 20 units set across all
categories.  In contrast, several predominantly rural authorities seek contributions from
single house developments while the most common threshold is set at 4 units or more.
Only two Planning Authorities set a minimum figure of 10 units. 
Overall, it was considered that reducing the figure to 5 units is appropriate as this
would reflect more accurately the effect new development has on services, in
particular, the cumulative impact of a number of small developments.  In contrast, a
threshold of less than 5 units would result in a considerable administrative burden
while resulting in low value contributions that would not bring significant community
benefit.  Setting the figure at 5 units was therefore the recommended approach in the
draft guidance.  The proposed changes would result in an increase in the number of
cases requiring developer contributions (approximately 15 per annum on average
based on applications over the last 3 years) which is considered to be manageable
and proportionate.  Since the draft version was approved, approval has been given by
the Community and Enterprise Resources Committee to create a post for an officer to
be specifically aimed at dealing with contributions.  A secondary issue is the impact of
lowering the threshold on Small and Medium Enterprises.  Small housebuilders are
local businesses and, from an economic development viewpoint, there is a desire to
help small businesses retain and safeguard jobs as we emerge from the impact of the
pandemic.  In addition, it was proposed that contributions will not be sought from
Registered Social Landlords (for example Housing Associations) from their affordable
housing schemes. 
The one exception to the above relates to contributions for affordable housing from
private housebuilders.  The high-level Policy 12 – Affordable Housing in SLLDP2
states that affordable housing provision will only be sought for developments of 20 or
more units.  This sets the context on this issue and under current legislation the figure
could only be changed if the entire Local Development Plan were reviewed.  It is,
therefore, intended that the 20 unit threshold will remain in this respect.  Nevertheless,
237

Page 238

this matter will be reviewed when work starts on the preparation of the next Local
Development Plan. 
5.3 Education contributions
In assessing the need for additional educational accommodation, an annual
assessment is carried out by Education Resources for both denominational and non-
denominational establishments.  This considers the capacity at each of the secondary
schools and the associated feeder primary schools.  The housing land supply figures
for each educational catchment area (referred to as learning communities in South
Lanarkshire) are fed into the capacity assessment.  This gives an indication of any
shortfall in school places for each primary and secondary school within the Council
area as a result of the new development and the level of contribution required per
dwelling constructed in that learning community together with the level of any required
contribution to nursery provision.  Several changes were promoted by Education
Resources to better reflect the school population. 
5.4 Active travel
At present contributions towards the impact of development on the road network apply
to items such as roundabouts and traffic signals.  However, the revised SPG proposes
extending this to cover measures to promote active travel.  Applications requiring a
Transport Assessment or Transport Statement are now required to be accompanied
by an active travel plan to show the proposal promotes opportunities for travel by
sustainable travel modes.  Direct reference should be made to the Council’s own
Active Travel Study for the relevant settlement to help identify measures to incorporate
active travel schemes to serve new development.  A number of additions and
improvements to the existing cycling network are included in each.  In addition, the
South Lanarkshire Cycling Strategy identifies proposed strategic routes across the
area. 
Emerging national planning policy sees the creation and maintenance of 20 Minute
Neighbourhoods as a means of achieving compact and connected neighbourhoods to
ensure people meet the majority of their daily needs within a reasonable walk, wheel
or cycle of their home.  New housing developments will be required to encourage
people to live more locally and contribute to the creation of sustainable travel options
and safe living environments.  As a result, developers will be required to consider how
these aspirations can be met.  Layouts for new developments will be required to show
how safe active travel connections to the neighbouring area can be achieved.  In
addition, applicants will need to demonstrate how their schemes will contribute to
sustainable travel by either creating new or enhancing existing active travel networks
(taking into account the Council’s existing priorities) or providing associated facilities
to facilitate active travel such as the implementation of 20mph speed limits and
gateways to settlements or neighbourhood areas and the provision of cycle shelters
or bicycle charging points.  
5.5 Libraries/community facilities
The proposed SPG includes a new detailed methodology for identifying the need for,
and a methodology for calculating, contributions to address the impact of new
development on existing community assets such as libraries and community facilities. 
The general approach when assessing the impact of a proposal on community facilities
will be to continue to improve and expand existing facilities to meet the new demand
generated by new developments before considering the creation of new facilities or
assets, but with consideration being given to the need to ensure that facilities are
accessible to the community.  
238

Page 239

The need for a contribution for additional building capacity will be established by
comparing the current capacity of the library and population it serves against the
number of people likely to be generated by the new development.  Where new
development places demand on the facility above its physical capacity, a new building
or an extension to an existing facility may be required.  A similar calculation can be
made in relation to library stock. 
It should be noted that existing guidance on the provision of play and recreation
facilities in a new development and the need to make a contribution to provide new, or
upgrade existing, local facilities (as set out in the Residential Design Guide) remains
unchanged at present.  However, it is intended this will be the subject of review when
the Residential Design Guide is refreshed, and work starts on the now statutory Open
Space Strategy.  The value of the financial contribution towards the provision of, or the
upgrading of, existing facilities in lieu of on-site provision will range from £1,500
upwards per dwelling for the time being. 
6. Current Position
6.1 Following the carrying out of a 6 week public consultation on the draft guidance, a total
of 6 letters of representation were received, none of which were submitted by the major
housebuilders.  Responses from SEPA, Scottish Water, Historic Environment
Scotland and Blantyre Community Council offered no objections/support for the
approach set out in the document. 
Representations from Burnside Community Council requested that they be notified of
any major changes that might affect local infrastructure.  In response, community
councils currently receive a copy of the weekly list of planning applications and can
ask to be formally consulted on applications in their area.  In addition, they are a
statutory consultee for applications that would have a significant impact on the amenity
of their area. 
Quothquan and Thankerton Community Council raised a number of legitimate issues
in relation to the provision of services in the rural area in general that are beyond the
scope of the planning system.  In relation to the use of developer contributions to
remedy existing provision, the ability of the Council to seek payments is very much
governed by legislation and Scottish Government planning policy.  Contributions can
only be sought where a proposed development would have an impact on the capacity
of existing facilities including schools, halls and libraries.  They cannot be asked for in
order to address existing deficiencies in capacity or deal with structural defects for
example.  Methodologies for assessing capacity issues have been developed.  The
reduction of the threshold for seeking contributions from developers from 20 units to 5
should result in small schemes mainly prevalent in the rural area being asked to make
contributions. 
6.2 A number of minor updates have been made to the proposed document to provide
clarification or include definitions of certain matters.  The minor changes carried out to
the document has enabled the document to be improved in terms of its readability and
clarity.  Overall, however, the general principles of the guidance remain unchanged
from the original draft (and as described in section 5 above).  It is therefore
recommended that the Supporting Planning Guidance, attached as an appendix to the
report, be approved and, thereafter, be published on the Council’s website.  If
approved, the SPG will be a material consideration for any planning applications. 
7. Employee Implications
7.1 The preparation of the Supporting Planning Guidance has been carried out using
existing staff resources within Planning and Regulatory Services. 
239

Page 240

8 Financial Implications
8.1 The financial resources required to the deliver the Local Development Plan including
any associated SPGs is based upon current budget levels available to Planning and
Regulatory Services.  Changes in these resources may impact on the programmes
presented. 
9. Climate Change, Sustainability and Environmental Implications
9.1. A Strategic Environmental Assessment (SEA) of Local Development Plan 2, including
the Plan’s spatial strategy, policies and potential development sites, was carried out
as required by the Environment Assessment (Scotland) Act 2005.  The comprehensive
and robust SEA helped to ensure that SLLDP2 fulfils its purpose of providing a clear
framework to direct development in an environmentally sustainable way, ensuring any
wider environmental issues were considered as far as reasonably possible.  The SEA
helped to improve the linkage between the local environment, sustainable lifestyles
and the potential for promoting sustainable economic development across
communities. 
9.2 A SEA Screening Report for the SPG was prepared and submitted to the statutory
Consultation Authorities (Historic Environment Scotland, NatureScot and Scottish
Environment Protection Agency) for their consideration.  All three agencies have
advised that further SEA work is not required as the SPG is unlikely to have significant
environmental effects other than those already identified, assessed and reported
within the SEA of SLLDP2. 
10. Other Implications
10.1 The SLLDP2 was adopted in April 2021.  However, it is necessary to provide detailed
guidance to support the adopted planning policies.  There would be a reputational risk
if this was not undertaken.  The SPG proposed is aimed at providing clarity and
transparency on seeking developer contributions. in South Lanarkshire. 
11. Equality Impact Assessment and Consultation Arrangements
11.1 An Equalities Impact Assessment (combining Child Rights and Wellbeing Impact
Assessment) is not required. 
David Booth
Executive Director (Community and Enterprise Resources) 
20 September 2022 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
Priorities
 We will work towards a sustainable future in sustainable places
Outcomes
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities 
240

Page 241

Previous References
 Report to Planning Committee 15 February 2022 
List of Background Papers
 Planning (Scotland) Act 2019
 Circular 6/2013 – Development Planning
 Circular 3/2012 - Planning Obligations and Good Neighbour Agreements
 South Lanarkshire Local Development Plan 2 adopted April 2021 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tony Finn, Montrose House,154 Montrose Crescent, Hamilton, ML3 6LB
Ext:  5170  (Tel: 01698 455170)
E-mail: tony.finn@southlanarkshire.gov.uk 
241

Page 242

242

Page 243

1.0 Introduction              Appendix 1
Supplementary Guidance (SG) on a range of matters was prepared under the provisions of Section 22 of the Planning etc. (Scotland) Act 2006
and formed part of the South Lanarkshire Local Development Plan that was adopted by the Council in 2015. Following the adoption of South
Lanarkshire Local Development Plan 2 in 2021 the statutory status of existing Supplementary Guidance as part of the development plan fell.  As
a result the Council has started a process of reviewing the existing SG.  Nevertheless they will continue to be used in the decision making process
for planning applications as they remain the Council’s agreed position until they are replaced.
Section 9 of the Planning (Scotland) Act 2019 has removed the ability of Planning Authorities to prepare new Supplementary Guidance. Circular
6/2013 – Development Planning states that planning authorities may issue non-statutory planning guidance to provide detail on a range of
subject areas.  This form of guidance does not form part of the development plan.  However, adoption by the Council gives it formal status,
meaning that it will be a material consideration in decision making.  Planning guidance can be updated as required and without the need for
approval by Scottish Ministers.
The Council has prepared draft Supporting Planning Guidance (SPG) to provide information and assistance to developers regarding Community
Infrastructure Assessment in relation to seeking developer contributions.  The guidance supports the policies in South Lanarkshire Local
Development Plan 2, in particular Policy 7 – Community Infrastructure Assessment, and will be a material consideration in the determination of
planning applications.  This SPG is intended to provide guidance at an early stage on the nature and scale of contributions that may be sought in
order that these can be taken into account and factored into a developer’s financial appraisal.  Throughout assessment of these needs it will be
the Council’s aim to strike a balance between setting contributions at a level that addresses the projected impact and ensuring that the
development remains viable.
The approved SG on Affordable Housing is also of relevance and should be read in association with this SPG. 
This Supporting Planning Guidance was approved by South Lanarkshire Council at its meeting on 13 October 2022. 
Supporting assessments
A series of assessments informed the preparation of the SPG.   The technical studies are noted below.  
18
243

Page 244

Strategic Environmental Assessment
In accordance with the Environmental Assessment (Scotland) Act, 2005, the Council prepared and submitted a strategic environmental
assessment (SEA) screening report to the statutory consultation authorities, summarising its view that this SPG is unlikely to have significant
environmental effects.  The consultation authorities agreed with the Council’s view and the Council made a formal determination that a SEA is
not required for this SPG.  The Council reached this view because it sits under the hierarchy of the Glasgow and the Clyde Valley Strategic
Development Plan and the South Lanarkshire Local Development Plan 2, both of which have undergone SEA.  The SG does not seek to change
or amend policies in these plans, including Policy 7 Community Infrastructure Assessment. 
Habitats Regulations Appraisal
A Habitats Regulations Appraisal (HRA) screening exercise for this SPG will be undertaken in compliance with the EC Habitats Directive (Council
Directive 92/43/EEC), and the Conservation (Natural Habitats, &c.) Regulations 1994 as amended.  This will be included in the HRA Record for
the SLLDP.  Any changes required as a result of the HRA shall be incorporated in the finalised supplementary guidance.
Equalities Impact Assessment
An Equalities Impact Assessment of the South Lanarkshire LDP2 community infrastructure assessment policy was carried out and it was
concluded that there are no adverse impacts on any of the communities covered by equalities legislation or on community relations.
The above technical studies can be viewed on the Council's website and are available on request from the Council.
NB The SPG makes various references to policy and guidance from the Scottish Government and other statutory agencies. As this may change
during the lifetime of the SPG, developers are advised that they must comply with the version that is current at the time of their application.  
244

Page 245

2.0 Context 
The legislative basis for seeking developer contributions is found at section 75 of the Town and Country Planning (Scotland) Act 1997.  This
allows planning authorities to enter into a planning obligation to restrict or regulate the development or use of land including a requirement to
make payments where appropriate.  The obligation is registered in the Land Register of Scotland which means it is enforceable by the planning
authority against the owner of the land and successors in title.
Developer contributions are not like other funds which are available for local communities to bid for.  They have to be sought in line with the tests
described below and must directly relate to the impact the development will have on an area.  In addition, developers will not be asked to pay to
address existing shortfalls in the provision of Council facilities or services nor address defects such as structural repairs to existing buildings
which are not linked to the development.
More detailed guidance is set out in Circular 3/2012 - Planning Obligations and Good Neighbour Agreements.  A revised version was published
in November 2020.  It advises that the planning system guides the future use of land and in considering planning applications, authorities must
consider each application on its merits based on the development plan and any other material considerations.  Planning obligations can be useful
to overcome obstacles which may otherwise prevent the grant of planning permission by mitigating negative impacts a development may have
on land use, the environment or infrastructure.
It goes on to state consideration should be given to the economic viability of proposals when deciding the form and scale of contributions as a
planning obligation may have a financial impact for developers and make proposals uneconomic.  Cash flow can also be affected in cases where
substantial sums of money have to be paid either before the development gets under way or at an early stage in construction.  This can be
addressed by agreeing phased payments.     
The Circular sets out 5 tests that planning obligations must meet to be lawful.  All of the tests should be met for the obligation to be appropriate.
They should 
⧫ Be necessary to make the proposed development acceptable in planning terms 
⧫ Serve a planning purpose 
⧫ Relate to the proposed development either as a direct consequence of the development including the cumulative impact of
development in the area 
⧫ Fairly and reasonably relate in scale and kind to the proposed development
⧫ Be reasonable in all other respects  
245

Page 246

A draft National Planning Framework 4 (NPF4) was published by the Scottish Government for consultation in November 2021.  In relation to
planning obligations it states that a review of developer contributions will be carried out to evaluate the effectiveness of existing mechanisms to
inform potential new approaches, in particular taking into account the powers to introduce an infrastructure levy in the Planning (Scotland) Act
2019. 
Local development plan policy
Policy 7 of the South Lanarkshire Local Development Plan 2 relates to community infrastructure assessments and states that these are required
to recognise the impact a development may have on a specific area, for example on the road and footpath network, education provision,
recreational and community facilities.
Where development proposals would require capital or other works or facilities to enable the development to proceed, financial contributions towards
their implementation will be required.  Where justified in accordance with the provisions of Circular3/2012: Planning Obligations and Good Neighbour
Agreements, contributions will be sought in relation to affordable housing; roads and transportation; education provision; recreation; and council-
owned community facilities. Supporting Planning Guidance will be prepared and consulted on, including in relation to the contributions sought.  These
contributions will be appropriately assessed, and developers will be required to ensure transparency in the financial viability of a development. In
each case contributions must:-
i. serve a planning purpose
ii. be necessary to make the proposed development acceptable in planning terms
iii. be directly related to the proposed development
iv. be fairly and reasonably related in scale and kind to the proposed development and
v. be reasonable in all other aspects.
The Council will either seek the direct provision of such works or facilities by developers, or, in appropriate cases, a financial contribution from the
developer to fund off-site provision either by third parties or by the Council itself.  Where contributions are required these should be secured through
planning condition or a legal agreement before permission is issued. Lump sum payments for capital works will normally be made when the work is
carried out but consideration will be given to the use of endowments, phased payments, or other mechanisms, provided clear timeframes are agreed.
Development proposals must also accord with other relevant policies and proposals in the development plan. Refer to Appendix 1 for relevant Volume
2 policies and additional guidance.
In addition, Policy 12 – Affordable Housing in SLLDP2 is relevant 
246

Page 247

The Council will expect developers to contribute to meeting affordable housing needs across South Lanarkshire by providing, on sites of 20 units or
more, up to 25% of the site’s capacity as serviced land for the provision of affordable housing. In addition, other solutions will be considered if these
prove to be the most appropriate for the site.
If on-site provision is not a viable option the Council will consider off-site provision in the same Housing Market Area. In these areas the Council
expect developers to make a contribution to fund social rented affordable housing on alternative locations within the same Housing Market Area.
The provision of a commuted sum will only be acceptable if on or off-site provision cannot be provided in the locale or there are no funding
commitments from the Scottish Government.
Development proposals must also accord with other relevant policies and proposals in the development plan. Refer to Appendix 1 for relevant Volume
2 policies and additional guidance. 
247

Page 248

3.0 Requirements for community infrastructure assessment
Community infrastructure assessment (CIA) is a process carried out by the Council to identify and address the impact a new development may
have on a specific area. The purpose of this SPG is to expand on Policy 7 - Community infrastructure assessment and Policy 12 – Affordable
Housing in SLLDP2 and set out the Council’s procedure for assessing, determining and collecting any financial contributions arising from the
CIA.
Which development proposals will be subject to a Community Infrastructure assessment?
Policy 7 of SLLDP2 limits the areas in which contributions may be sought to the following;
⧫ Affordable Housing
⧫ Roads and Transportation (this will include the public road network as well as walking and cycling routes)
⧫ Education provision (including primary/secondary schools and nursery provision)
⧫ Recreation/open space/play areas
⧫ Council-owned community facilities (including libraries and public halls)
The Council will carry out a community infrastructure assessment for all new housing proposals involving 5 or more units where it is identified
that the development will have an impact on the local infrastructure such as roads, footpath networks, education, community facilities and open
space/play provision.  It will also include an assessment of the affordable housing contribution from new residential developments of 20 units
or more.
The Guidance sets out the procedure which shall be followed for assessing contributions.  This assessment could also apply to other types of
development such as industrial, retail or leisure.
Developer contributions will be calculated on the basis of whole sites.  Applications for parts of sites will pay a proportion of the total site
contribution requirement.
NB The submission of planning applications for small developments comprising 4 units or less where they are clearly part of a phased
development of a larger site or landholding in order to avoid making contributions will not be acceptable.  
248

Page 249

What types of development don’t require contributions to be made?
A number of exceptions to the policy are set out below. 
⧫ The conversion or renovation of a listed building or one that makes a significant contribution to the character of a conservation area
⧫ Special needs housing including sheltered and amenity housing
⧫ Affordable housing developed by, or on behalf of, the Council or by a Registered Social Landlord
How will the community infrastructure assessment be carried out?
The community infrastructure assessment will be carried out alongside the assessment of the planning application.  When an application is
submitted which is considered to have an impact on local infrastructure, to a degree that requires it to be addressed, the relevant Council
Service(s) will be asked to identify the works to address the impact and the potential level of contributions required to carry them out.  The
affordable housing contribution will also be identified.
Pre-application discussions are highly recommended as early engagement with the planning service can establish if an assessment is needed.
Agreement with the planning service on the scope and content of supporting information to inform the CIA will also prevent delays in the
consideration of the planning application as well as unnecessary work being carried out.
Policy 7 in SLLDP2 recognises that economic circumstances and funding constraints can affect the viability of a proposal.  In such cases the
Council will ask for the developer to undertake a financial viability assessment for the development taking account of the level of contributions
being asked for.  This allows a reasonable and proportionate approach to the level of contributions expected and the timing of the works being
carried out/phasing of payments.  The aim is to strike a balance between setting contributions levels so that they address any direct impact of
the development and ensuring the proposal remains viable. Circular 3/2012 includes a ‘scale and kind test’ in recognition that entering into an
obligation can have financial consequences for developers and may make proposals uneconomic.
This will require developers to be transparent in these discussions and provide the information needed to assess the impact of contributions on
viability. This will include
⧫ Detailed build costs
⧫ Market evidence
⧫ Valuation reports to support the land values
⧫ A project programme and phasing plan
⧫ Indicative offers for affordable units (if applicable)
⧫ A viability appraisal 
249

Page 250

4.0 Community infrastructure assessment process
The diagram in Appendix 1 illustrates the process for assessing the levels of contribution required as part of a community infrastructure
assessment, together with their delivery. The procedure includes an opportunity for the consideration of the overall level of contributions being
sought compared to the development and land costs in order that the viability of the development can be assessed.
Affordable housing
A contribution towards affordable housing is required for all residential developments of twenty or more dwellings on a site.  Policy 12 of SLLDP2
requires the developer to accommodate up to 25% of the total number of units for the provision of affordable housing.  This can be through
delivery on-site involving either the identification and transfer of serviced land for the Council to build out or a turnkey arrangement where the
developer builds the units and transfers them to the Council to manage.  Alternatively, the developer may deliver the required number of units at
another location off -site or make a financial contribution to delivery elsewhere within the relevant Housing Market Area.  The Council’s Strategic
Housing Investment Plan (SHIP), which sets out how investment in affordable housing will be directed over a 5 year period, will be used to identify
where commuted sums will be allocated.
The process for agreeing what type of affordable housing contribution is required is fully detailed in the associated approved Supplementary
Guidance on Affordable Housing which sets out the requirements for affordable housing from new housing developments.  This recognises that
not all sites are suitable for the provision of affordable housing on-site and in these cases a financial contribution will be made towards the
provision of affordable housing elsewhere.
It is recommended that early discussions are carried out for any proposal for the erection of twenty or more dwellings to ascertain how this
contribution can best be met, that is by providing housing on site or on an alternative site, or by paying a commuted sum to the Council to be
used to provide housing in the same Housing Market Area as the proposed development.  At this point the Council will advise on the appropriate
tenure mix, type and scale of affordable housing that is required to meet the housing need in the Housing Market Area in which the site is located. 
The suitability of the site itself to meet that demand will also be assessed using factors such as whether it is in an accessible location; the
topography of the site; whether the affordable housing can be integrated into the wider development; and the scale of development or proximity
to other managed units.  Further detailed guidance on the different delivery methods and how to determine the nature and level of contributions
required can be found in Chapter 4 of Supplementary Guidance 7 : Affordable Housing.
Once an in-principle view has been established on the preferred form of affordable housing contribution a valuation methodology for the level of
contribution is agreed to ensure this issue is given early consideration as part of the developers site appraisal.  The level of contribution is based
on the value of the land. The Council and developer will jointly instruct an independent surveyor to carry out a valuation of the land.  The instruction
will state that the valuation is for the purposes of calculating affordable housing contributions and that the surveyor’s report must indicate a
250

Page 251

value for each plot, were it to be developed for mainstream housing for sale.  It is this valuation per plot that will enable the level of financial
contribution for affordable housing to be calculated.
For the purposes of calculating the plot values for affordable housing, it is assumed that the plot value for an affordable housing unit is exactly
half that of the plot value for mainstream housing for sale.  The total contribution towards affordable housing applicable for each site will be
calculated by using the following formula. 
This formula will give the overall contribution towards affordable housing on site but can be expressed as a contribution per plot by dividing the
overall contribution by the total number of units proposed on site.
Education
New housing developments will normally generate additional pupils attending the local schools and nurseries which can have an impact on the
educational facilities serving the development.  In some cases additional demand for places can be met within the school’s existing capacity. 
However, where there is currently no capacity or where it is predicted there will be no capacity if other new housing developments identified in
the Local Development Plan 2 are realised, then a contribution towards the provision of additional educational accommodation is required.
In assessing the need for additional educational accommodation (nursery, primary and secondary), an annual assessment is carried out by
Education Resources for both denominational and non-denominational establishments.  This considers the capacity at each of the secondary
schools and the associated feeder primary schools.  The housing land supply figures for each educational catchment area (referred to as learning
communities in South Lanarkshire) are fed into the capacity assessment.  This gives an indication of any shortfall in school places for each
primary and secondary school within the Council area as a result of the new development and the level of contribution required per dwelling
constructed in that learning community together with the level of any required contribution to nursery provision.  A report is produced on an
annual basis identifying where there are capacity issues and therefore where contributions will be sought by the Council.
There are currently 124 primary schools, 17 mainstream secondary schools and 7 additional support needs schools in South Lanarkshire.  These
are grouped into 17 Learning Communities within South Lanarkshire.
The following mechanism is used to calculate developer contributions on a fair, transparent and equitable basis.
The LDP2 identifies potential housing sites together with indicative housing numbers and it is these Housing Land Supply figures which allow
Education Resources to predict the likely numbers of pupils generated within a particular Learning Community. 
Value per plot divided by 2 multiplied by 25% of the total number of units proposed on site 
251

Page 252

The likely number of pupils generated is based on a pupil generation formula which assumes that 35 pupils per year group will be generated by
1000 new dwellings.  From the 35 pupils per year group, a split of 75% of these pupils will be considered non denominational and 25%
denominational.  This split does, however, vary within some areas of South Lanarkshire and therefore, where appropriate, Education Resources
may apply an area specific split to the projected number of pupils generated where it differs from the Council wide average of 75%/25%.
The year groups accounted for are Nursery – 2.27 years, Primary -  7 years and Secondary -  5.75 years.  The pupil generation formula takes
account of established trends in both the splits between denominational and non-denominational education and the number of pupils staying on
to complete a sixth year of secondary education.  The likely numbers of pupils generated as a result of new housing are combined with the pupil
roll projections to establish the total number of pupils.  Pupil roll projections are based on the actual numbers of pupils gathered via the annual
school census (each September), factored up to the appropriate year.
This allows the Council to identify both capacity issues arising from the existing population and those arising as a result of new developments. 
Developer contributions will only be sought to address capacity issues arising from new developments.  The Council will address and manage
any existing over capacity issues.
If a capacity issue is identified as a result of new development, the level of developer’s contributions will be calculated on an assumed need for
3.5m2 of gross internal floorspace per secondary pupil, 9m2 per primary pupil and 4.5m2 per nursery pupil.  The cost to provide this amount of
floorspace is calculated using up to date figures and costings from the Council’s Schools Modernisation Programme Partnership.  The current
figure per square metre will be updated on a regular basis to take account of fluctuations in build costs and will be made available to developers
on request.
The above calculations will be carried out on an annual basis and a statement for each learning community throughout the Council will be
produced. The above methodology will allow the following:
⧫ an equitable spread of costs amongst all developments;
⧫ an early and fast response to developer requests for the likely levels of contributions; and
⧫ greater capacity for aligning funding to provide the required educational space at the required time. 
252

Page 253

Roads and transportation
The development of sites for housing and other uses may generate levels of traffic which require improvements to the wider road network.  This
may include addressing impacts to the pedestrian, cycle and public transport network.  When consulted on a planning application Roads and
Transportation Services will assess the suitability of the proposed layout within the application site and the impact of the development on the
wider road and footpath/cycling network and so identify the improvements needed to the network to accommodate the development.  The costs
of addressing this impact on the wider network will be met by the developer.  Plans submitted with the application should be sufficient to allow
the cost of the works to be calculated, including any phased implementation and impact on utility apparatus, in order to accurately assess the
level of contribution required.
A similar exercise will also be required where a development may impact on the trunk road network.  This will require developers to liaise with
Transport Scotland regarding potential costs and the implementation of improvements.
Where a new development or a change of use of land or buildings is likely to generate a significant increase in the numbers and types of trip, a
Transport Assessment (TA) should be carried out.  This will identify if any road or transportation improvements require to be carried out such as
new or improved access to the site and major road improvements outwith the site.  This could also include a contribution to the provision of
public transport services.
There may be other types of development that do not require a full transport assessment but which have an impact that requires road
improvements to be carried out.  In these cases, a Transport Statement (TS) may be required as a result of the developments location and/or the
type of development proposed.  It is recommended that the developer engages with the planning service as early as possible in the project’s
development to agree if any mitigation is required.
Any off-site road works identified by the TA/TS must be fully designed and costed by the developer, including services, and agreed by the
Council’s Roads and Transportation Services before planning consent is issued.  These discussions will include the technical aspects of off-
site works to ensure that the final scheme meets with the Council’s standards, timescales and costings, including where appropriate, inflation
to cover a delay in implementation of the works.  Where a number of developments are proposed which cumulatively will impact upon a
specific area of the local network, the cumulative effect should be addressed and any required improvements identified.  Their implementation
will be secured either by making a financial contribution to the Council through a Planning Obligation or through construction by the developer
via a separate legal agreement.  A similar exercise, covering all of the above and involving discussions with Transport Scotland will be required
where improvements are needed to the trunk road network.  
253

Page 254

Active travel
Policy 15 – Travel and Transport in the SLLDP2 states that, where appropriate, a Transport Assessment or Transport Statement to be submitted
in support of a planning application will be accompanied by an active travel plan to show the proposal promotes opportunities for travel by
sustainable travel modes.  The scope for the TA/TS and the outputs form will be agreed in advance and, where necessary, will identify the
mitigation required to reduce travel by car and promote walking, cycling, wheeling and public transport.
The Council has completed a number of active travel studies for its main settlements Active Travel Studies.  These documents will inform
decision making on planning applications and help identify measures to incorporate active travel schemes to serve new development.  A number
of additions and improvements to the existing cycling network are included in each. In addition, the South Lanarkshire Cycling Strategy identifies
proposed strategic routes across the area.
20 Minute Neighbourhoods are a method of achieving compact and connected neighbourhoods to ensure people meet the majority of their daily
needs within a reasonable walk, wheel or cycle of their home.  New housing developments will be required to encourage people to live more
locally and contribute to the creation of sustainable travel options and safe living environments.
As a result the Community Infrastructure Assessment will be required to consider how these aspirations can be met by developers.  Layouts for
new developments will be required to show how safe active travel connections to the neighbouring area can be achieved.  In addition, applicants
will need to demonstrate how their schemes will contribute to sustainable travel by either creating new or enhancing existing active travel
networks (taking into account the Council’s existing priorities) or providing associated facilities to facilitate active travel such as the
implementation of 20mph speed limits and gateways to settlements or neighbourhood areas and the provision of cycle shelters or bicycle
charging points.  In most cases it is expected that a reasonable and proportionate financial contribution will be made to the Council towards the
implementation of it’s existing priorities and projects.
Early discussions with Roads and Transportation Services to discuss the potential requirements and level of contribution is recommended.
Community Facilities and Recreation/Sporting Facilities
This section of the guidance considers the impact of new development on Council owned community facilities such as libraries and community
halls (defined as a versatile space which can be hired for activities such as classes, meetings, and sport and recreation) and large scale sporting
facilities such as sports halls/centres and pitches.  It also looks at the requirements for new housing developments to include appropriate levels
of open space and recreation within the site.  The reference to the 20 Minute Neighbourhood concept above is equally relevant in this section of
the guidance. 
254

Page 255

In order to ensure community and recreation/sport facilities are available to serve a new development, the impact of new dwellings on the current
provision on them must be considered.  It has been the Council’s approach to concentrate such facilities in specific areas as opposed to having
a large number of smaller facilities that would incur higher management costs and may have a more limited appeal to residents.  The general
approach when assessing the impact of a proposal on community facilities is to improve and expand existing facilities to meet the new demand
before considering the creation of new facilities or assets, but with consideration being given to the need to ensure that facilities are accessible
to the community.
Libraries
Local authorities in Scotland have a statutory duty to provide an adequate library service under the Local Government etc (Scotland) Act 1994. 
The Scottish Library and Information Council advise that an adequate service should provide a number of core functions including providing
access to hardcopy and electronic resources which are free; enabling access to resources for reading, information and learning; encouraging
community involvement and community based activity; helping to minimise social and digital exclusion; promoting access to Scotland’s cultural
heritage; and promoting cultural and creative activities.
Community Infrastructure Assessment will consider the impact of new housing development on library services.  In particular, it will determine
whether contributions are required to build a new library or extend/alter/adapt existing libraries (including construction and fit out costs) and/or
expand existing stock.  The following methodology will be used for each element
New Library or Extension to
Existing 
Step 1 - Assess Existing Provision
and Identify Deficit 
• Identify the library within the catchment area of the new
development 
• Identify the population within that catchment.
• Identify the floorspace of the library.
• Identify if there is a deficit in library provision within the defined
catchment (as a result of the new development) based on a
requirement for 30sqm per 1,000 population.
255

Page 256

Step 2 - Identify solution  • Where a deficit is identified the mitigation will be identified by
the Council for example, a library extension, shared facility or new
library). It should address the existing deficit and further deficit
caused by the proposed development. The developer will ONLY
contribute toward addressing the further deficit created.
Step 3 - Calculate Contribution  • Population created by new development = Number of units x 2.3
(average household population).
• The sqm of new library floorspace required as a result of the
new development = Population created by new development /
37.311 (equivalent to 1sqm per 37.33 population).
Costing of new floorspace to be based on: Building costs linked to
the RICS BCIS Tender Price Index and new build prices and fitting
out costs based upon current fitting out costs of new provision in
South Lanarkshire Council area.
• Identified developer contribution divided by the population
coming forward as a result of the development (cost per person).
• Contribution per unit = the cost per person x 2.3 (average
household population).
The need for a contribution will be established by comparing the current capacity of the library and population it serves against the number of
people likely to be generated by the new development.  The capacity of the library is determined on a service requirement of 30m2 of public library
space per 1,000 catchment population, based on the current model of delivery and found in the Museums, Libraries and Archives (MLA) Council
advice published in 2008.  The catchment population of the library is identified by the home addresses of customers who borrow from that library
using data from the Council’s Library Management System.  For any postcode where the majority of customers use a specific library, that library
will include that postcode in its catchment area. Using this methodology will determine if the library is under capacity to serve the new population. 
256

Page 257

Where new development places demands on the library above its existing physical capacity, (so that a new library or an extension/adaption to
an existing facility is required), the following standard build cost charges will be applied based on the level at the time of the planning application
and will be subject to negotiation with the developer:
• Building costs linked to the RICS BCIS Tender Price Index and new build prices. 
• Fitting out costs including furniture and technology based upon current fitting out costs of new provision in South Lanarkshire Council area. 
In addition a contribution towards enhanced stock levels will also be required to be addressed. In cases where a library building is able to
accommodate the extra demand created by a new development, but stock levels are only adequate to meet the needs of the existing catchment
population, a ‘stock only’ contribution will be sought.  The National Library standard upper threshold cites a recommended stock level of 1,532
items per 1,000 population. An average price of £5.88 per stock item will be adopted based on Askews and Holts Library Services book prices in
January 2019. 
Stock  
Step 1 - Assess Existing
Provision and Identify Deficit 
• Identify the library and define the library’s catchment. 
• Identify the population within that catchment.
• Identify the stock level held by that library.
• Identify if there is a deficit in stock level within the defined
catchment based on a requirement of 1,532 items of stock
per 1,000 population.  
257

Page 258

Step 2 – Calculate Contribution  Where a deficit is identified then the level of stock required to
address the shortfall must be calculated and a cost
confirmed.
• Costing would be based on:
o Number of dwellings x 2.3 per dwelling (average household
population) = Number of people generated by the
development.
o Number of people generated by development x 1.532
(items per person) x £5.88 (cost per stock item).
Community Halls and Sports Centres
The Local Government and Planning (Scotland) Act 1982 requires local authorities to ensure there is an adequate provision of facilities for the
population for sporting, recreational, cultural and social activities.  The Council aims to improve participation in cultural and physical activities in
order to promote health, inclusion and wellbeing.  The use of these facilities will play a significant role in satisfying this aim.
A wide range of facilities located across South Lanarkshire are used to support the delivery of these activities. In order to maintain and provide
the statutory provision of an appropriate level of service, the impact of new dwellings on current provision must be considered. Community
Infrastructure Assessment will consider the impact of new housing development using the following methodology.
Step 1 - Assess Existing
Provision and Identify
Deficit
.
• Identify the community hall(s)/sport centres etc within the
catchment area of the new development. 
• Identify the population within that catchment.
• Identify the floorspace of the facility(s).
258

Page 259

• Identify if there is a deficit in facility provision within the defined
catchment based on a requirement for 0.51 sqm per house.
Step 2 - Identify solution  Where a deficit is identified then a solution must be defined by the
Council (for example, a facility extension, shared facility or new
facility). The Solution should address the existing deficit and further
deficit caused by the proposed development. The developer will only
contribute toward addressing the further deficit created.
Costing would be based on: Building costs linked to the RICS BCIS
Tender Price Index and new build prices and fitting out costs based
upon current fitting out costs of new provision in South Lanarkshire
Council area.
Step 3 – Calculate
Contribution 
Identified solution / the population coming forward within facility
catchment = cost per person.
• Cost per person x 2.3 (average household population) =
contribution per house. 
The need for a contribution will be established by comparing the current capacity of the facility and population it serves against the number of
people likely to be generated by the new development.  The capacity is determined based on a service requirement of 0.51sqm of facility space
per household (this is an average figure based on data from UK local authorities).  The catchment population of the facility is defined based on
20 minute walking distance (1 mile).
Where new development places demand on facilities above their current physical capacity, (that is a new facility or an extension to an existing
facility is required), the following standard build cost charges will be applied based on the level at the time of the planning application and will
be subject to negotiation with the developer. 
259

Page 260

• Building costs linked to the RICS BCIS Tender Price Index and new build prices. 
• Fitting out costs based upon current fitting out costs of new provision in South Lanarkshire Council area. 
Amenity Open Space and Recreation/play provision
The table below provides a general indication of the minimum requirements for the provision of amenity open space and play/recreation areas
which the Council will seek in new residential developments. It should be noted that amenity open space is defined as space that is used for
landscaping, informal leisure or social activities and must be provided over and above the space required for formal sport/recreational activities.
In all but the cases of small housing proposals (up to 10 units where a financial contribution only is expected to be provided) new housing
developments are required to make a contribution to the improvement of existing play/recreational facilities within the vicinity of the site or
provide facilities (a play area/modern games court/youth facility) within the site – or a combination of all of those options. In general terms the
creation of play area(s) on-site is the preferred option.
The value of the financial contribution towards the provision of, or the upgrading of, existing facilities in lieu of on-site provision will range from
£1500 upwards per dwelling.  The final figure and how the financial contribution will be spent, however, will depend on the location of the site
and other relevant planning circumstances such as the open space needs of the area as well as the nature, type and size of development.  It is,
therefore, strongly recommended that the developer engages with the Planning Service as early as possible in the project’s development to agree
the most appropriate option for each development.
Developer’s contributions may also be used to invest in facilities which if funded in this way would allow the delivery of additional projects to be
brought forward and thus cater for the increased demand generated by a development.
Contributions will also be considered where they are required to mitigate the effects of new development on existing parks in the area.  They will
be used to deliver projects which will enhance and increase the capacity of parks and can include the upgrade of play equipment, new outdoor
seating improved drainage or new/replacement planting. 
260

Page 261

5.0 Collection of developer contributions 
Legal obligations
Following agreement on the nature, level and timing of contributions, their collection will be facilitated through a planning obligation by Minute
of Agreement.  The Council’s Legal Services have prepared a model legal agreement a copy of which can be requested, through the planning
officer dealing with the planning application for the development.
The model agreement will set out the basis for the payment of developer contributions, for example, by using a matrix, which has been agreed
through discussions, and detailing how the project’s contributions may be phased.  An example of how this has been done for a housing site can
be found in Appendix 2 of the SPG which indicates the level of contributions per house plot and how this has been programmed.  Unless otherwise
agreed, contributions will be collected annually in arrears.
One of the main threats to the efficient long term management of community facilities is financial uncertainty and the availability of funding to
invest in them. In terms of developer’s contributions, projects identified may include the upgrading of facilities as a result of increased use due
to the proposed development. In order to ensure that the works required to cater for the increased use generated by the development are
completed by the time they are needed, funding may have to be provided at an early stage.  This would have to be agreed with the developer to
ensure that the timing of the financial contribution could be accommodated.
Governance
The identification and collection of contributions involves a three stage process.
Stage 1: Initial Planning Consent and Set Up
Discussions with the developer and the spending Resources will be carried out in line with the guidance earlier in this document.  Once the
amount and phasing of contributions have been agreed the legal obligation will be completed and the decision notice issued.  A standard form
will be issued with the consent informing the developer of the payment requirements each year (if applicable) and the method of payment.
Stage 2: Annual monitoring of Developer Contributions
The Council will issue a standard letter to the developers in the last week in March) advising that they should advise the Council of the numbers
of houses completed in the previous year by mid April, the payment that has been made to date and the date by which the next payment must be
received.  
261

Page 262

Once the developer has responded re number of houses completed this will be compared with completion certificates provided by Building
Standards.  Once the figure is agreed the Council will issue an invoice with the amount required to be paid and the method of payment.  Once the
payment is received it will be ring-fenced for the purposes set out in the legal obligation.
Stage 3: Drawing down developer contributions
Once the spending Resource is in a position to carry out the project that the contribution is required for it will draw down funds as appropriate.
Spending Resource submits an exception to Finance to add spend to the Capital Programme 
6.0 Monitoring and review
The need to formally review this SPG will be considered after two years following its approval and biennially thereafter. Any changes in circumstances,
policy or legislation prior to this will be taken into consideration and appropriate alterations made to the content of this SG. 
262

Page 263

Appendix 1
263

Page 264

Appendix 2 
264

Page 265

Report
Agenda Item 
Report to: Planning Committee
Date of Meeting: 11 October 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: South Lanarkshire Local Development Plan 2 
Supporting Planning Guidance: Hagshaw Energy
Cluster Development Framework 
1. Purpose of Report
1.1. The purpose of the report is to:-
Amended
 inform the Committee of the work undertaken to prepare Supporting Planning
Guidance (SPG) comprising a Development Framework for the Hagshaw Energy
Cluster 
 seek Committee approval for the proposed SPG as set out in the Appendix and
the carrying out of a 6 week period of public consultation 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[r]
(1) that the draft Hagshaw Energy Cluster Development Framework, attached as an
Appendix to the report, be approved;
(2) that the Supporting Planning Guidance be published and made available for a 6
week period of consultation; and
(3) that the Head of Planning and Regulatory Services be authorised to make
drafting and technical changes to the non-statutory planning guidance prior to its
publication, following public consultation.   
3. Background
3.1. The Planning Committee on 1 December 2020 agreed to carry out the necessary steps 
to adopt the proposed South Lanarkshire Local Development Plan 2 (SLLDP2).  The 
Plan was submitted to Scottish Ministers in February 2021 for them to advise of the 
Council’s intention to adopt the Plan and notice was received in March that adoption 
could proceed.  The SLLDP2 was subsequently adopted in April 2021. 
3.2. Following the adoption of the South Lanarkshire Local Development Plan 2 in April
2021, the Council has begun preparation of a series of supporting guidance to support
the Plan.  Section 9 of the Planning (Scotland) Act 2019 has removed the ability of
Planning Authorities to prepare new statutory Supplementary Guidance which was
previously the means of creating additional guidance.  However, Circular 6/2013 –
Development Planning states that planning authorities may issue non-statutory
planning guidance to provide detail on a range of subject areas.  This form of guidance
does not form part of the Development Plan.  However, approval by the Council gives
19
265

Page 266

it formal status, meaning that it will be a material consideration in decision making.  For
noting, non-statutory planning guidance is referred to as Supporting Planning
Guidance (SPG) by the Council. 
3.3. In late 2019, South Lanarkshire Council was invited by NatureScot to take part in a
new project, piloting an innovative approach to renewable energy development.   The
cross-boundary project was intended to bring together a number of different renewable
energy developers, working cross-boundary alongside South Lanarkshire Council,
East Ayrshire Council, NatureScot and Architecture and Design Scotland, to explore
how a more strategic, joined-up approach to renewable energy development could be
taken that could achieve greater and multiple benefits. 
3.4 The project centres around Hagshaw Hill, which sits on the western edge of South
Lanarkshire, between the communities of Coalburn and Douglas in South Lanarkshire
and Muirkirk in East Ayrshire.  The majority of the area sits within South Lanarkshire,
with a relatively small part sitting within the East Ayrshire side of the boundary.  The
area is well established as a renewable energy location; the original Hagshaw Hill wind
farm, constructed in 1995, was Scotland’s first commercial wind farm.  Since that time,
a series of wind farms have been erected in the locality, involving a number of different
developers and landowners.  Together, the operational wind farm developments and
those consented but not yet implemented will provide a generating capacity of 584
MW, comprising approximately 190 turbines (the majority sitting within South
Lanarkshire).  There is potential over the next few years for proposals for the re-
powering of existing windfarms (involving the replacement of the original turbines with
new larger turbines), possible extensions to existing developments and the co-location
of other renewable energy technologies such as hydrogen generation and solar energy
which makes Hagshaw an ideal area of focus for this work. 
3.5 In July 2021, Land Use Consultants (LUC) were commissioned by NatureScot, in
collaboration with the two Councils and wind farm developers, to prepare a
development framework for the cluster.  The framework is intended to set out, at a
strategic level, the opportunities for the cluster, in terms of maximising renewable
energy output, but at the same time maximising social, economic and environmental
benefits of development and minimising any negative environmental impacts.  The
framework takes a place-based approach, focusing on how Hagshaw can be
developed to become a better place that is better connected to its surrounding
communities.  The approach of bringing wind farm developers together in this way, to
achieve more, is the first time such an approach has been piloted in Scotland and can
be seen as an important development in the drive to achieve net zero carbon
emissions by 2045.   
3.6 The development framework has been underpinned by community engagement.  From
October to December 2021, a virtual public exhibition room and online questionnaire
were hosted on a dedicated project website and publicised through the Council’s social
media.  The questionnaire sought views on the concept, vision and key aims and
objectives of the framework.  Over 80% of the respondents supported the more
collaborative approach to energy development.  In addition, targeted engagement was
undertaken with surrounding community councils.  
266

Page 267

4. Current Position and Status of the Framework
4.1. A steering group, comprising of South Lanarkshire Council, East Ayrshire Council,
NatureScot and renewable energy developers, was established in 2021 to oversee the
work of LUC.  A draft Framework has now been signed off by the steering group and
effectively handed over to South Lanarkshire Council and East Ayrshire Council.  The
draft Framework is set out in Appendix 1. 
4.2. The draft framework sets out a long-term vision for the Hagshaw cluster – a place
which ‘delivers optimised renewable energy generation and contributes towards
Scotland’s Just Transition to Net Zero, whilst delivering sustainable and inclusive
growth for local communities.  Integrated nature-based solutions, with enhanced
connectivity supporting healthy, resilient communities and ecosystems, in response to
the challenges of climate and biodiversity emergencies’.  The vision is underpinned by
six interrelated themes that priorities and projects should seek to deliver on:- 
 Realising the renewable energy opportunity
 Resilient and connected communities
 Co-ordinated enhancement of nature
 A strong identity, of heritage, people and place
 Inclusive, sustainable growth
 Outdoor recreation to support health and wellbeing 
4.3. The Framework identifies opportunities and potential projects for progressing the
themes above.  Examples include (i) co-ordinated approach to habitat management,
to support key priority species and habitats within the cluster; (ii) enhanced
connectivity between communities through the enhancement of existing and creation
of new active travel links, linking to the River Ayr Way; (iii) integration of alternative
renewable energy technologies to support and compliment wind energy; and (iv) new
infrastructure for recreational activities within and surrounding the cluster.  
4.4. As noted in 3.2 above, Planning Circular 6/2013: Development Planning sets out
procedures for planning authorities to prepare and adopt non-statutory planning
guidance.  This form of guidance can usefully be used to provide detail on a range of
subject areas.  This form of guidance does not form part of the Development Plan. 
However, approval by the Council gives it formal status, meaning that it will be a
material consideration in decision making.  It is therefore considered that the best
approach for the draft Development Framework to be taken forward is to adopt it as
non-statutory planning guidance.  This approach has been agreed with East Ayrshire
Council as well as the Hagshaw Steering Group. 
5. Next Steps
5.1. Whilst there is no statutory requirement to publish non-statutory planning guidance
(Supporting Planning Guidance) for public consultation, it is considered best practice
to do so, in order that the document can be refined and improved through feedback
and suggested amendments.  All other Supporting Planning Guidance approved by
the Planning Committee has been the subject of consultation. 
5.2. The draft Development Framework was presented to the East Ayrshire Cabinet at its
meeting on 7 September 2022 and was approved as draft non-statutory planning
guidance.  Public consultation was also agreed.  Should the draft Framework receive
approval from Planning Committee, in order to ensure a cohesive approach to
consultation, it is proposed that the consultation will run simultaneously across both
authorities, commencing towards the end of October and lasting for 6 weeks.   
267

Page 268

5.3. Going forward, attention will turn to the implementation of the opportunities identified
in the Framework.  An action plan is under preparation, which will identify lead
partners, funding opportunities and potential timelines for the opportunities set out in
the Framework.  It is noted that the Council has recently appointed an Economic
Development Officer, with specific remit for the Douglas Valley, in which Hagshaw sits. 
Whilst the focus of the role will be on engaging with South Lanarkshire communities
in the area and taking forward the action plan, there is an intention that the officer will
also look to work collaboratively cross-boundary into East Ayrshire with their Economic
Growth Service. 
5.4. In view of the above, it is recommended that the draft Development Framework as set
out in the Appendix is approved.  If approved, it is intended to finalise the document
and thereafter it will be published and made available for public comment later in 2022
for a 6 week period.  Following consultation, should no significant changes be
proposed to be made to the draft document, the guidance will be adopted by both East
Ayrshire and South Lanarkshire Councils.  If significant changes are required as a
result of the consultation, a further report will be brought to Planning Committee. 
5.5.  Subject to the Committee’s approval, the proposed SPG will become a material
consideration in the determination of planning applications alongside the adopted
South Lanarkshire Local Development Plan 2. 
6. Employee Implications
6.1. The preparation of the Supporting Planning Guidance and subsequent implementation
of the management plans will be carried out using existing staff resources within
Planning and Regulatory Services and the Countryside and Greenspace team.  The
sites are entirely owned by the Council and maintained by Grounds Services with
grounds maintenance regimes in place; no additional staff time is predicted for
planned, ongoing site management. 
7. Financial Implications
7.1. The financial resources required to deliver SLLDP2 including any associated non-
statutory planning guidance are based upon current budget levels available to
Planning and Building Standards Services.  Changes in these resources may impact
on the programmes presented. 
8. Climate Change, Sustainability and Environmental Implications 
8.1. A Strategic Environmental Assessment (SEA) of Local Development Plan 2, including
the Plan’s spatial strategy, policies and potential development sites, was carried out
as required by the Environment Assessment (Scotland) Act 2005.  The comprehensive
and robust SEA helped to ensure that LDP2 fulfils its purpose of providing a clear
framework to direct development in an environmentally sustainable way, ensuring any
wider environmental issues were considered as far as reasonably possible. 
8.2. In accordance with the relevant legislation, an SEA Screening Report for the draft
Framework has been prepared and submitted to the statutory Consultation Authorities
(Historic Environment Scotland, NatureScot and Scottish Environment Protection
Agency) for their consideration.  They have confirmed SEA is not required. 
9. Other Implications
9.1. The SLLDP2 was adopted in April 2021.  However, it is necessary to provide detailed
guidance to support the adopted planning policies.  There would be a reputational risk
if this was not undertaken. 
268

Page 269

10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new or recommend a change to existing policy,
function or strategy, therefore, no impact assessment is required. 
David Booth
Executive Director (Community and Enterprise Resources) 
20 September 2022 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
Priorities
 We will work towards a sustainable future in sustainable places
Outcomes
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 Planning Committee Report 26 February 2019: South Lanarkshire Local Development
Plan 2
 Planning Committee Report 1 December 2020: South Lanarkshire Local Development
Plan 2 
List of Background Papers
 South Lanarkshire Local Development Plan 2 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
James Wright, Planning Team Leader (HQ), Council Offices, Floor 6, Almada Street,
Hamilton, ML3 0AA
Phone: 07551 839 698   
Email: james.wright@southlanarkshire.gov.uk 
Appendices 
Appendix 1 – Draft Hagshaw Development Framework
269

Page 270

270

Page 271

Draft Development Framework
July 2022 Renewable Energy : People  | Place  |  Nature
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero19
271

Page 272

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 2
Project Steering Group
NatureScot
Architecture & Design Scotland
East Ayrshire Council
South Lanarkshire Council
3R Energy Solutions Ltd.
Project Team
Land Use Consultants (LUC)
BiGGAR Economics
RPS Group
Richard Carman Architectural Illustrator
STAR Development Group
Website: www.thehagshawenergycluster.co.uk
Email:  info@thehagshawenergycluster.co.uk
Twitter: @HEnergyCluster
Contents
Cover Image: The Hagshaw Energy Cluster © Richard Carman
ScottishPower Renewables
Energiekontor UK Ltd.
Octopus Renewables  
BayWa.re UK Ltd.
Ventient Energy
Executive Summary         3
What is the Project about?        4 - 5
Why a Development Framework?         6
The Current Hagshaw Energy Cluster      7
Policy Context           8 - 9
What is the Hagshaw Energy Cluster?      10 - 11
The Evolution of an Energy Landscape      12 - 13
The Vision and Key Aims         14 - 15
What are the Key Benefits?        16 - 17
Consultation and Engagement       18 - 19
Delivering the Vision - The Journey to Net Zero...    20 - 21
1. Realising the Renewable Energy Opportunity    22 - 25
2. Resilient and Connected Communities      26 - 29
3. Coordinated Enhancement of Nature      30 - 33
4. A Strong Identity, of Heritage, People and Place    34 - 37
5. Inclusive, Sustainable Growth       38 - 41
6. Outdoor Recreation to Support Health and Wellbeing    42 - 45
Future of the Hagshaw Cluster Energy Cluster     46 - 47
Technical Annex - Wind Energy of the Future      48 - 49
Glossary of Terms         50
List of Stakeholders         51
References           52 - 53
272

Page 273

Image: Looking west to the Hagshaw Hill Energy Cluster from above
Conexus West site © Airbourne Lens
Page 3
Welcome to the Hagshaw Energy Cluster
Development Framework We’re delighted tobe working with thegroup to pilot a newapproach to onshorewind energy whichcan help deliver a just transition and more investment in nature.
- NatureScot
“
”Role of the Development Framework
Potential 1GW+
of Renewable
Energy Generation
Local Prosperity
and Thriving
Communities
A Regional
Green Energy
Employment Hub
East  Ayrshire Council and South Lanarkshire Council
will use the Development Framework as a basis for
working with developers, communities and other
stakeholders to promote and adopt a coordinated
approach to future renewable energy development
across the cluster. The Development Framework will
inform, shape and support the delivery work. The
framework represents an ambitious vision for the future,
but is not a statutory plan.
Landowner and community forums will be set up to
support the delivery of the vision and specific projects,
progressed via an Action Plan to be developed in
summer 2022.
If Scotland is to achieve Net Zero greenhouse
gas emissions by 2045, we believe a more
collaborative and inclusive approach to how we
achieve this goal is needed.
The Hagshaw Energy Cluster is an established strategic
location for large scale renewable energy projects, with
a committed capacity of almost 585 MW. Future plans,
policies and decisions by local authorities should reflect the
cluster’s suitability for hosting a range of renewable energy
developments which can be deliveried at pace to achieve
Scotland’s Net Zero ambitions.
Coupled with advocating quality through design and
maximising benefits for people, place and nature, the
Development Framework identifies opportunities to deliver
enhancement to both communities, and the natural and built
environment, and support a thriving and prosperous local and
regional economy.
The first important milestone on the journey to net Zero will
be achieving the Scottish Government’s 75% reduction in
greenhouse gas emissions by 2030, and the changes we
make during this current decade will be critical to ensuring we
are on the right path to achieving that goal.
The Development Framework has been developed
together between the local authorities, renewable energy
developers and operators, statutory agencies and
communities to create a shared vision for the cluster.
It sets out an ambitious but deliverable ten year vision
for how a more strategic and collaborative approach to
renewable energy development can help us achieve
Net Zero together in a just and fair way.
273

Page 274

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 4
What is the Project about?
Working together on a Development Framework for the Hagshaw Energy Cluster
In 2020 NatureScot brought together a group of wind farm developers and operators with East Ayrshire Council and South Lanarkshire
Council to discuss how we could work together on the future of renewable energy development in the context of planning for, and
delivering Net Zero in Scotland.  Focused on the cluster of wind farms near Hagshaw Hill on the border of South Lanarkshire and
East Ayrshire, and located between the communities of Coalburn, Douglas and Muirkirk - the Hagshaw Energy Cluster was born. 
Other stakeholders were engaged in initial discussions, including the Scottish Government, Historic Environment Scotland (HES),
Scottish Environment Protection Agency (SEPA), Scottish Forestry, Forestry and Land Scotland (FLS) and the Royal Society for
the Protection of Birds (RSPB), along with a range of consultants involved in renewable energy developments within the existing
cluster, to scope out the topics where there may be opportunities to collaborate and coordinate.
A project steering group was formed and has worked together to prepare this Development Framework for the cluster. Although a
familiar design tool for many other forms of development, we believe this is the first time this approach has been taken in Scotland
towards shaping a more strategic approach to renewable energy development and related opportunities.  We hope to demonstrate
how a more coordinated and structured approach to planning, consenting and delivery of renewable energy development can help
deliver a Just Transition to Net Zero.
The key contributors to the development of the Framework include:
In 2021, Land Use Consultants (LUC), working with BiGGAR Economics, RPS Group and Star Development Group, was
commissioned to develop the project and engage with landowners, communities, local businesses, and other interested parties to
shape the Development Framework. 
NatureScot
Architecture & Design Scotland
East Ayrshire Council
South Lanarkshire Council
3R Energy
ScottishPower Renewables
Energiekontor UK Ltd.
Octopus Renewables  
BayWa.re UK Ltd.
Ventient Energy
Image: Looking west to the Hagshaw Energy Cluster from above Conexus West site © Airbourne Lens274

Page 275

Page 5
As Scotland’s design champion we believe in the power of design to improve people’s lives.
Our vision is a Scotland whose places are healthy, sustainable and thriving, and where
everyone works together to shape their future.
We are delighted to be part of the collaborative approach taken at the Hagshaw Energy
Cluster which aims to see the benefits of the Place Principle become an everyday reality in
the way Scotland’s places are created, adapted and sustained.
- Architecture & Design Scotland  
“
”
275

Page 276

Glasgow
Edinburgh
Hagshaw Energy Cluster
400kv Transmission Network
M74
Key
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 6
The Development Framework will be adopted by both East Ayrshire Council and South Lanarkshire Council
as non-statutory planning guidance and will help shape future development within the cluster in a clear and
coordinated way. It will create an overarching design vision for the Hagshaw Energy Cluster and the surrounding
area. Through the key themes and objectives it will seek to deliver a wide range of potential benefits alongside
existing committed renewable energy development, and future proposals which may be brought forward
through in the coming years.
Alongside National Planning Framework 4 (NPF4), Local Development Plans (LDPs) and relevant
Supplementary Guidance (SG), the councils will refer to this non-statutory planning guidance to inform
decision making.
How will the Development Framework be used?
Existing and emerging planning policy advocates that design tools, such as design frameworks and development
briefs, can look to make places better and promote positive change – the same principle can be applied to this
Development Framework.
Development frameworks have been used regularly for large scale strategic development addressing a particular
land use challenge, development type or opportunity through a co-ordinated approach. Many development
frameworks can act as the precursor to more detailed masterplans, providing a spatial vision with flexibility for
detail to be brought forward through a potential masterplanning process.
Onshore wind energy is expected to continue to make a substantial contribution towards the target of Net
Zero by 2045, with current Scottish Government ambitions targeting a further 8 - 12 GW of new onshore wind
deployment by the interim target of 75% reduction in emissions by 2030. The cluster could deliver a significant
proportion of this target through the deployment of consented developments, and the future extension and
repowering of existing wind farms.
Why a Development Framework?
Monitoring and Reviewing the Framework
The Development Framework is designed to be in place for at least ten years, but will be updated as required,
to reflect the changing baseline context, respond to changing planning policies and the evolution of renewable
energy technologies. The future governance of the framework will be agreed during the formal adoption process,
and East Ayrshire Council and South Lanarkshire Council will monitor and review the framework in line with
their relevant LDP timescales.
Development Frameworks and Renewable Energy Why here?
The Hagshaw Energy Cluster is uniquely placed in central-southern Scotland, close to large conurbations,
key transport and communication routes, and areas of rich industrial, cultural and natural heritage.
Since the construction of the original Hagshaw Hill Wind Farm in 1995, wind energy in the cluster has
evolved, and the next decade will see a new generation of wind farms emerge. Whilst communities have
benefitted from the presence of renewable energy developments in the area over many years, we believe
that future opportunities for enhancement which benefit people, place and environment will be increased as
committed and future development is delivered.
276

Page 277

The Current Hagshaw Energy Cluster
Page 7
584 MW
Wind Energy Generation
Over 2,000 ha
Productive Conifer Forest
Over15,000
people living within
5km of the cluster 
Over 80 ha
Potential Industrial &
Employment Land at Conexus
<1 hour
from Glasgow &
Edinburgh by road
277

Page 278

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 8
Policy Context
International Policy
National Policy
Local Policy
Policy drivers for the principles underpinning the Development Framework start at an international level, with the United Nations (UN) 17 Sustainable
Development Goals (SDGs). They recognise that ending poverty and other deprivations must go hand-in-hand with strategies that improve health
and education, reduce inequality, and spur economic growth - all while tackling the global climate and biodiversity crises. The SDGs are becoming a
pivotal part of policy making for many governments, and a more global outlook on tackling climate change was underlined at the 26th United Nations
Climate Change conference (COP26), held in Glasgow in 2021.
In April 2019, the Scottish Government became the first government in the world to declare a climate emergency. In line with this declaration, the SDGs
are embedded in the draft National Planning Framework 4 (NPF4) for Scotland which is currently being consulted on by the Scottish Government
and will incorporate Scottish Planning Policy (SPP). It will form the long-term plan for Scotland, setting out where development and infrastructure is
needed to support sustainable and inclusive growth, whilst achieving Net Zero by 2045. The draft NPF4 sets out four key outcomes it will focus on:
Net Zero Emissions, A Wellbeing Economy, Resilient Communities and Better Greener Places. An update to the Onshore Wind Policy Statement is
also due to be published during 2022, setting out a vision for an additional 12 GW of onshore wind installed capacity by 2030.
The National Performance Framework was introduced in 2007, with the most recent update having taken place in 2018. It sets out a vision for the
national wellbeing of Scotland, an overall purpose and vision, and ‘National Outcomes’. The Performance Framework measures Scotland’s progress
using a range of economic, social and environmental ‘National Indicators’, and is supported by the Place Principle in ensuring a collective purpose
for Scotland.
The extents of the Hagshaw Energy Cluster are covered by the respective Local Development Plans of East Ayrshire Council and South Lanarkshire
Council. It is anticipated that future iterations of the Development Plans will incorporate support for the Development Framework. The framework will
be monitored and reviewed in line with the development of national and local policy.
The Development Framework will form non-statutory planning guidance alongside each LDP. The Development Framework does not replace or
supersede other existing adopted policy from East Ayrshire Council or South Lanarkshire Council. It complements the principles of key guidance
documents related to renewable energy in the area.
Regional Policy
Strategic Development Plan (SDP) Areas are found across several regions of Scotland and focus on the key land use and development issues
that may cross planning authority boundaries. Most of the Hagshaw Energy Cluster is located within the southern extents of the Clydeplan area. As
per the Planning (Scotland) Act 2019, the current SDP will soon expire and a new non-statutory Regional Spatial Strategy will be prepared for the
Clydeplan area as well as a separate one for Ayrshire. It is envisaged that the Hagshaw Energy Cluster, and other similar wind farm clusters, could
form a key strategic development area within Regional Spatial Strategies.
Regional Spatial Strategies will support Regional Growth Deals, and the CoRE project in Cumnock in particular, provides opportunities for linkages
with the Development Framework. Regional Land Use Partnerships are being piloted by the Scottish Government to help develop Scotland’s
approach to land use in support of our green recovery and transition to Net Zero.
East Ayrshire Council is excited to be part of this new approach to planning for renewable
energy.  We think, that by taking a cross boundary and collaborative approach, we can
achieve more.  More benefits for our communities and local economy, more habitat and
landscape enhancements, and more clean, green energy, helping to play our part in tackling
the climate emergency.
We hope to be able to approve the framework as a new piece of planning guidance that will
help guide and influence future development in the Hagshaw cluster and also demonstrate
more widely that a joined up, strategic approach to renewable energy development is the
best way forward.
- East Ayrshire Council
“
Image: Douglas West Wind Farm and the main Poniel access to the Hagshaw Hill Energy Cluster © LUC
278

Page 279

Page 9
2030 Agenda
for
Sustainable
Development
National
Performance
Framework
(NPF)
NPF3-SPP/
NPF4
Clyde
Plan
Regional
Spatial
Strategy for
Ayrshire
Regional
Land Use
Partnerships
South Lanarkshire
LDP2 + SG
East Ayrshire  LDP /
LDP2 + SG
Hagshaw
Energy Cluster
Development
Framework
Net-Zero
Emissions
A
Wellbeing
Economy
Better,
Greener
Places
Resilient
Communities
yrshire Council is excited to be part of this new approach to planning for renewable
e think, that by taking a cross boundary and collaborative approach, we can
achieve more.  More benefits for our communities and local economy, more habitat and
landscape enhancements, and more clean, green energy, helping to play our part in tackling
e hope to be able to approve the framework as a new piece of planning guidance that will
help guide and influence future development in the Hagshaw cluster and also demonstrate
more widely that a joined up, strategic approach to renewable energy development is the
- East Ayrshire Council
”
est Wind Farm and the main Poniel access to the Hagshaw Hill Energy Cluster © LUC
250,000 ha
Scottish Government
target for peatland
restoration by 2030
18,000 ha
Scottish Government
target for new
woodland each year
by 2024-25
2045 
Scottish Government
target for Net Zero
greenhouse gas
emissions
279

Page 280

584 MWTotal Committed Wind Energy Generation
Capacity
1 GW+ Potential Renewable Energy Capacity
Potential Solar PV generation
Wind Farm Extensions and Repowering
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 10
Potential Green Hydrogen Production
280

Page 281

Hagshaw Hill
(15.6 MW - 26 turbines at 55m)
Hagshaw Hill Extension
(26 MW - 20 turbines at 80m)
Galawhistle
(66 MW - 22 turbines at 110 - 121m)
Nutberry
(15 MW - 26 turbines at 115m)
Douglas West
(46.8 MW - 13 turbines at 149.9m)
Dalquhandy
(42 MW - 10 turbines at 149.9m)
Hagshaw Hill Repowering
(84 MW - 14 turbines at 200m)
Cumberhead
(48.3 MW - 14 turbines at 180m)
Hare Craig
(36 MW - 8 turbines at 150-230m)
Douglas West Extension
(78 MW - 13 turbines at 200m)
Cumberhead West
(126 MW - 21 turbines at 200m)
Operational
/ Under 
Construction
Wind Farms:
259.7 MW
Consented
Wind Farms:
324 MW
Page 11
What is the Hagshaw Energy Cluster?
Existing Renewable Energy Development
Onshore wind energy development within the Hagshaw Energy Cluster has grown organically since Hagshaw
Hill Wind Farm was first commissioned in 1995. There are now seven operational or under construction wind
farms within the cluster. A further four projects have consent,  including Hagshaw Hill Repowering, one of the
first wind farm repowering proposals in Scotland.
The cluster includes developments at various stages in their life cycle from consented, under construction,
operational and soon to be repowered, making it the ideal location to pilot a new approach which could leave a
long lasting legacy. Over the coming years it is expected that renewable energy generated from onshore wind
will reach almost 585 MW within the cluster as committed development is deployed. However, over the life of
the Development Framework it is envisaged that this may increase as further existing schemes are repowered
and/or extended, and other renewable energy technologies are co-located.
Optimisation and Diversification
The cluster has the potential to make a greater contribution towards Scotland’s renewable energy targets. In
addition to increased wind energy generation, greater diversification of renewable energy generated within the
cluster could be achieved through the deployment of other complementary renewable and low carbon energy
generation and storage technologies, including solar photovoltaics (PV), hydropower and battery storage.
The Scottish Government has set out an initial ambition of generating 5 GW of renewable and low-carbon
green hydrogen by 2030. There is clear opportunity to utilise the green energy generated from wind energy
development within the cluster to power green hydrogen electrolysers, which would contribute to a resilient
energy system.
HydropowerSolar PV Battery Energy Storage
Systems (BESS)
Green Hydrogen
Production Carbon CaptureCO
2
Achieving Net Zero
Scotland currently has almost 12 GW of installed renewable electricity generation, with onshore wind contributing
to almost 60% of all installed capacity. The Scottish Government has committed to decarbonising all energy
production by 2045. A large proportion of this will come from additional onshore wind development, with a
commitment for deployment of between 8 GW and 12 GW by 2030.
The extension and repowering of existing onshore wind farms will play a critical role in this substantial increase
in onshore wind energy development, on our journey towards achieving Net Zero carbon emissions by 2045.
Extension, Life
Extension and
Repowering
What could the future hold for renewable energy in the cluster?
281

Page 282

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 12
The Evolution of an Energy Landscape
Coal mining in the area begins in the early 19th
century, with intensive developments starting
around 1870. An influx in worker population
leads to the formation and growth of
communities centred around workers’ housing.
Discovery of iron ore in the area leads to
construction of a number of mine workings
starting in the late 18th century.
Depletion of coal seams in the area lead to the
closure of the majority of mines nearest the
cluster between 1950-1970. Restoration of a
number of these mines to areas of woodland
commences in the late 20th century.
Freight railways established to transport raw
materials for heavy industry and urban centres.
Passenger rail follows, leading to further
populating of the area and enhancement of
transport corridors.
Hagshaw Hill Wind Farm constructed in
1995 as the first commercial wind farm
development in Scotland with turbines of
c.55m to blade tip height
Large-scale commerical
forestry for timber production
increases in the area in the
mid to late 20th century.
19001800
Industrial History and Heritage
The Hagshaw Energy Cluster is located within an area of Scotland with a rich industrial heritage, and
which has played an important role in the provision of energy and resources throughout history.
The artefacts of many of the region’s past industries now form distinctive landmarks and contribute to
the identity and character of the area. Up until the late 18th century this area of Ayrshire and Lanarkshire
was predominantly agricultural and characterised by pastoral fields associated with burghs and landed
estates, typically located within the valley floors and lower slopes of the valley sides.  
The Industrial Revolution, coupled with the discovery of a number of coal and iron seams brought about
significant change to the area. From the late 18th century onwards, a number of mine workings became
fixtures in the landscape and led to an influx of workers. The need to transport raw materials to more
industrialised and urban areas led to the building of railways in the local area. 
Changing Priorities
Most deep mines closed between 1950 and 1970 with the final mine in the local area closing in 1972,
however open cast mining has been a more recent feature of many landscapes surrounding the cluster.
In the late 20th century, changing priorities for a more sustainable future resulted in a new industry for
the region. Sites for commercial wind energy developments began to be identified, proposed and built
in upland landscapes, harnessing renewable energy from the wind and creating a new chapter for the
industrial heritage and land use of the area.
In 1995 Hagshaw Hill Wind Farm was constructed as the first commercial wind farm in Scotland, 16MW of
installed capacity from 26 turbines, and is still generating renewable green energy today. The wind turbines
of Hagshaw Hill Wind Farm are now 25 years old, forming an established feature within the landscape, but
are nearing the end of their operational life. The site is intend to be repowered with 200m turbines delivering
a five fold increase in its generating capacity along with 30MW of energy storage.
1995
Hill and arable farming established
with extensive improvement to land,
removal of woodland and creation
of field enclosure.
Upgrading of the A74 to
create the M74 in the 1980’s,
bypassing Lesmahagow and
providing motorway connectivity
between Scotland and England.
Upgrading of high voltage
transmission network between
Scotland and England, providing
opportunities for the connection and
export of renewable energy from
southern Scotland 
Timeline
282

Page 283

Page 13
Hagshaw Hill Repowering granted consent
in February 2020 (200m to blade tip height).
Replacing the original Hagshaw Hill, the fourteen
6MW turbines will deliver a fivefold increase in
the green energy generated from the site.
Further wind farm developments are
constructed within the cluster in the early
21st century, including Nutberry (115m)
and Galawhistle (110-121m), whilst
Dalquhandy, Douglas West (149.9m) and
Cumberhead (180m) Wind Farms are
currently under construction.
Scotland to reach target of
Net Zero emissions of all
greenhouse gases by 2045.
Opportunity for the cluster
to contribute over 1GW of
renewable energy generation
towards the target.
Enhancement and creation of
local active travel routes and
networks to improving physical
and mental wellbeing, and
promote healthier lifestyles.
Adoption of the Development
Framework in 2022 with a 10-
year delivery and review period,
in which updates will be made
to respond to changing baseline
context and policy
2000 2022
Evolution of Wind Turbine Technology
Since the original turbines of the Hagshaw Hill Wind Farm were deployed turbine technology, planning
and financial support mechanisms for onshore wind development have significantly evolved. The cluster
hosts not only some of Scotland’s earliest wind turbines, but will soon host some of the tallest, with recent
consented developments consisting of turbines between 200m and 230m to turbine blade tip height.
These advances in technology and co-located complementary technologies are bringing greater efficiencies
and reduced intermittency to the harnessing of renewable green energy, and contributing towards rapid
decarbonisation of electricity generation in Scotland.
The coming decade will see the build out of the other consented wind farms in the cluster, and the potential
repowering of other existing operational wind farms. The Development Framework seeks to help influence
and maximise the renewable energy opportunity of the cluster, whilst seeking to create other opportunities
for business, industry and local employment.
2045
10 Year review
Extension, life extension and
repowering of existing wind
farms within the cluster delivering
optimised generation and greater
unity in wind farm design.
Establishment of potential
‘Renewable Energy Hub’ 
delivering employment and other
long term benefits to bring greater
prosperity to the local and regional
economy.
Construction of c.325 MW of consented
development by 2028, including Hare Craig
(230m) and Cumberhead West (200m)
consolidating the existing cluster to almost
585 MW of green energy generation.
Long-term enhancements to
nature and biodiversity, and
establishment of the cluster
as a destination for outdoor
recreation and adventure.
The landscape surrounding the cluster continues to be influenced by a number of other forces for change,
and climate change looks set to influence the biggest changes yet. As Scotland continues its journey
towards Net Zero emissions, via a Just Transition to a low carbon economy, it is important that a shared
vision for the area acknowledges and manages these forces for change so that the distinctive character
and identity of the area and its communities are retained, and wherever possible enhanced.
The Development Framework creates a vision for the future of the cluster, with the flexibility to evolve in
order to address future challenges and priorities, and create a positive lasting legacy which includes the
presence of renewable energy development in the landscape in perpetuity.
A Pilot for the Future
2030
283

Page 284

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 14
Renewable Energy : People | Place 
The Vision
A place-based vision for the future development of the Hagshaw Energy Cluster which delivers
optimised renewable energy generation and contributes towards Scotland’s Just T
Zero, whilst delivering sustainable and inclusive growth for local communities.
Integrated nature based solutions, with enhanced connectivity supporting healthy, resilient communities
and ecosystems, in response to the challenges of the climate and biodiversity emergency
“
284

Page 285

Page 15
The vision is underpinned by five key aims: 
1. Support the efficient delivery of the   
renewable energy potential of the   
cluster, taking account of all     
appropriate technologies and the   
optimisation, extension and   
repowering of existing wind farms
2. Maximise the social, economic and   
environment benefits of renewable   
energy development within the cluster
3. Support the Just Transition to a low   
carbon future through a place-based   
approach
4. Minimise adverse impacts of     
development on the environment and 
local communities
5. Deliver investment in nature to   
enhance climate change and     
biodiversity resilience
“
”
Key Aims    
Place | Nature
place-based vision for the future development of the Hagshaw Energy Cluster which delivers
Transition to Net
resilient communities
and ecosystems, in response to the challenges of the climate and biodiversity emergency.
”
Image: The Hagshaw Energy Cluster seen from above the Conexus West site © Airbourne Lens
285

Page 286

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 16
What are the Potential Benefits? Environmental
• Space for nature and improved ecological resilience
• Support for landowners and land managers to make wildlife
improvements
• Increased climate change mitigation via carbon capture and
sequestration, on the journey to achieving Net Zero
• Improved air quality, improving human health and nature
• Reduced risk of flooding and improved water quality through
nature based solutions
• Protection and enhancement of priority habitats & species - 
including moorland, wetland, woodland, and farmland
• Investment in Natural Capital, delivering wider   
complementary benefits
Development
• A clearer vision of what may represent appropriate  
development
• Increased prospect of positive planning outcomes for
stakeholders
• Increased opportunities for renewable energy generation
and provision of green energy to communities 
• Coordinated and innovative technical solutions
• Cost and time efficiencies to delivery of green energy 
developments on the route to achieving Net Zero
• The ability to plan for long-term investment
The Development Framework will help maximise the range and scale of benefits from the Hagshaw
Energy Cluster for people, nature and place, directed by local priorities and delivered through partnership
working.
The potential benefits can be grouped as:
Delivery of all committed and future renewable energy proposals within the cluster in a collaborative and
coordinated way could act as the catalyst for a range of potential benefits which are transformative for
local communities, the surrounding area and the wider central and southern Scotland region.
When will the vision be delivered?
The Development Framework sets out a ten year vision for the cluster, however it is envisaged that
some elements will be realised over a longer period of time. Throughout the framework short-term,
medum-term or longer-term opportunities are identified, with delivery dependant on the progression of
project feasibility, engagement of all relevant landowners and interested stakeholders and access to
capital investment funds.
South Lanarkshire Council (SLC) appointed an Economic Development Officer for the Douglas Valley
Initiative in summer 2022 to work with local communities to deliver projects which meet the aims of the
Framework.  The officer will help them to secure funding through the Renewable Energy Fund (REF)
and other sources and provide a resource to help deliver projects.  The role is part funded by Greencoat
Energy, NatureScot and SLC Council.
How will projects be funded?
The Development Framework doesn’t identify specific sources of funding to support the delivery of the
vision. It is anticipated that a partnership approach will be adopted to fund and deliver projects and pro-
posals within the framework via the public, private and third sectors - along with the appropriate use of
community benefit funds from development within the cluster.
Environmental
Development
Social
Economic
286

Page 287

Page 17
Social
• Improved access to high quality open spaces
• Improved physical and mental health and wellbeing of 
communities and visitors
• Improved social and physical connectivity between  
communities around the cluster
• Land brought into community ownership and delivering local 
benefits
• Active transport opportunities such as walking and cycling
• Improved aesthetic value and reinforced sense of place
• Increased opportunities for play, education and interaction
with nature
Economic
• Increased investment and annual spend into the local and
regional economy from development within the cluster
• Increased and more coordinated community benefits, which
can achieve better outcomes for communities
• Creation of new skilled industries, businesses and  
sustainable jobs in the green economy
• Increased economic activity and attractiveness for inward
investment
• A local economic identity to serve the cluster and wider 
regional renewable energy developments
• More productive and efficient use of land to deliver on  
strategic national targets, such as timber production
The
Benefits
287

Page 288

Over 325 individual visitors to online virtual public exhibition
Over 80% respondents supportive of a more collaborative approach
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 18
Inclusivity and transparency were key in developing the framework, involving a wide range of interested
parties and stakeholders with a direct connection to land within the cluster, and ensuring communities
who may have an interest in the project area were given the opportunity to contribute ideas or concerns,
and act as a sounding board for what is proposed.
Follow up consultation with specific landowners, community groups and community councils was
undertaken in early 2022.
Meetings were held with Coalburn Regeneration Group, and Muirkirk, Douglas and Lesmahagow
Community Councils to understand the key priority issues for communities located close to the cluster,
and explore how the Framework could assist in addressing challenges and delivering opportunities. The
Development Framework intends to assist in delivering these objectives, many of which are identified
in local Community Action Plans which have been developed by several communities which neighbour
the cluster.
Landowner and community forums will be set up to support the delivery of the vision and opportunities
outlined within the Development Framework. An accompanying Action Plan will be developed during
summer 2022, coordinated by the appointed Douglas Valley Initiative Economic Development Officer.
Consultation and Engagement
Formal Consultation Online Exhibition & Survey
The initial public consultation and participation phase
of the project ran for six weeks between October and
December 2021. A virtual public exhibition room and
online questionnaire formed the core aspect of the
consultation process, hosting information about the
project and our vision for the cluster.
Active participation of communities and interested
parties was encouraged, providing an opportunity
to shape the framework and reflect the ideas and
aspirations of all.
An online questionnaire was hosted on the project
website to obtain comments and feedback on the
concept, vision and key aims and objectives of the
framework.
Consultants Appointed
June 2021
Spring2020 Spring2021 Summer2021
Consultation & Participation
Phase
October - December 2021
Stakeholder Project
Briefing August 2021
Project Steering Group
Established March 2021
Working Group Meetings
January 2020 - March 2021
Autumn2021Winter2020
Established the Development
Framework Concept and Approach
March 2021
288

Page 289

Page 19
Appointment of Economic
Development Officer to develop and
deliver Action Plan Summer 2022
An interactive virtual public exhibition was hosted online at: www.thehagshawenergycluster.co.uk © LUC
Adoption of the
Development Framework
with a 10-year delivery period
Summer2022
Final draft Development Framework
for formal consultation
Spring2022
Focused Engagement with Key
Stakeholders and Community Groups
January - February 2021
Winter2021 A 10-year Vision to 2032
Review & Refresh of Framework
10 years after adoption
of framework
289

Page 290

We hope the Development Framework will help support the efficient delivery of renewable energy projects whilst optimising environmental, economic and social benefits to local communities and stakeholders. Tackling climate change will require us all to come together, and the Development Framework is a great example of this joined-up approach.
- The Hagshaw Energy Cluster Renewable Energy Developers & Operators
“
”
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 20
South Lanarkshire Council is looking forward to working collaboratively to
establish a long term development framework for the Hagshaw cluster to continue
to support large scale renewable energy projects.
This new approach of delivering planning guidance involves engagement with a
wide range of stakeholders including communities and local developers which will
set a national benchmark for collaborative planning for renewable energy in the
future and help achieve the Scottish Government’s Net Zero ambitions
- South Lanarkshire Council
“
”
290

Page 291

Page 21
The Development Framework will be delivered via six interrelated themes:
1. Realising the Renewable Energy Opportunity
2. Resilient and Connected Communities
3. Coordinated Enhancement of Nature
4. A Strong Identity, of Heritage, People and Place
5. Inclusive, Sustainable Growth
6. Outdoor Recreation to Support Health and     
Wellbeing
Delivering the Vision - The Journey
to Net Zero...
Key objectives define what each delivery theme of the framework is seeking
to achieve.
Key Objectives
A series of metrics have been identified for each delivery theme, identifying how
success will be measured in meeting the key objectives.
What does success look like?
Image: Douglas West Wind Farm site from the Douglas Valley/A70 east of Douglas © LUC
291

Page 292

Maximising green energy generation, whilst minimising impacts
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 22
Key Opportunities
1. Realising the Renewable Energy Opportunity
With almost 585 MW of committed onshore wind capacity now operational, under construction or consented, the
Hagshaw Energy Cluster will provide a substantial contribution to Scotland’s Net Zero Ambitions. However, this
may represent only a proportion of the real opportunity of the cluster.
Through a more coordinated approach to the design and implementation of extensions and repowering, coupled
with the collocation of other complementary renewable energy technologies, this ‘Regional Renewable Energy Hub’
could utilise existing infrastructure to make a strategic contribution to national energy targets.
The repowering and extension of existing wind farm schemes to achieve Net Zero presents new challenges and
opportunities. Optimisation of existing strategic clusters such as this, using the latest wind turbine technology
and other renewable energy technologies could make a significant contribution, whilst continuing to minimise and
mitigate adverse impacts on people, communities and the environment where possible.
Development of coordinated solutions to
cluster wide technical challenges such
as radar and aviation lighting, which
minimise infrastructure costs and minimise
impacts on operation, communities and the
environment.
Coordinated construction and operation
access strategy for development within the
cluster. Collaboration between renewable
developers, operators and other businesses
within the cluster to reduce infrastructure
costs and disturbance to communities from
abnormal load and heavy goods vehicles.
Develop co-location of other renewable
energy generation and storage technologies
- including, but not limited to solar PV
generation, battery storage systems, green
hydrogen production on appropriate sites
across the cluster, and close to existing grid
infrastructure.
Development of long-term design
principles for future wind farm
development within the cluster, with
clear design objectives, to deliver
optimised wind energy generation
whilst avoiding unacceptable effects on
the environment and communities (see
Technical Annex).
Technical
Collaboration
Coordinated
Access Strategy
New Green Energy
Sources & Storage
Cluster Wide
Design Principles
Explore the development of a Community
Renewable Energy Scheme with local
electricity charging regime for communities,
building on the work of Community
Councils. Distribution of green energy via a
local grid network generated from multiple
renewables technologies across the cluster.
A Local Green
Energy Network
Integration of other renewable energy technologies alongside wind energy development to maximise renewable
energy generation and efficiency © Richard Carman
First Generation
Hagshaw Hill
(55m turbines)
Extensions
Hagshaw Hill Extension
(80m)
Current Generation
Galawhistle, Nutberry,
Douglas West etc.
(115m > 150m)
Next Generation
Cumberhead West &
Harecraig etc.
(200m > 230m)
The Future 
(>230m)
?
292

Page 293

a.)  Optimise wind energy in cluster,   
through extension and repowering,   
and use of the most effective and   
efficient modern technology.
b.)  Avoid and mitigate unacceptable effects 
on the environment and surrounding 
communities through a strategic and 
coordinated approach to design.
c.)  Promote opportunities for co-location 
of other renewable energy   
technologies such as hydro, solar PV, 
energy storage and green   
hydrogen production.
d.)  Encourage developers and   
operators, to work together to   
identify innovative solutions to   
technical challenges, for example,   
grid, noise, aviation radar and lighting, 
abnormal load/construction access.
e.)  Promote opportunities for shared   
community ownership/location of   
renewable energy generation assets, 
and provision of green energy to   
communities via local green energy 
networks.
f.)  Encourage a strategic approach to   
the planning and delivery of increased 
grid transmission network capacity.
Key Objectives
Page 23
The creation of a regional Renewable
Energy Hub which supports the
construction, servicing, maintenance, and
eventual decommissioning and repowering
of wind farms within the cluster and
the wider region, and complements the
development of Scotwind offshore wind
energy hubs elsewhere.
Regional Renewable
Energy Hub
Future proofing the transmission and
distribution networks to support extension
and repowering of wind farms, and
diversified renewable energy generation
from the cluster, to provide greater
certainty to developers, grid operators, and
neighbouring communities.
A Future
Network Plan
Co-location of solar PV (similar to the above) and energy storage
technologies on appropriate sites across the cluster © LUC
Repowering with larger turbines may increase potential for long-term
coexistence of productive timber forest beneath turbines © Airbourne Lens
Collaboration between developers to share access routes for abnormal
loads and coordinate construction activities © Airbourne Lens
Work with ScottishPower Energy Networks to design an efficient grid
network which is fit for the future © LUC
293

Page 294

Maximising green energy generation, whilst minimising impacts
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 24
1. Realising the Renewable Energy Opportunity
What does success look like?
Community ownership of existing or
additional renewable energy assets within
the cluster, generating green energy which
is distributed and used locally, via a green
grid network.
Established regional flagship ‘Renewable
Energy Hub’ driving efficiencies and
innovation within the onshore wind sector,
and providing sustainable jobs suppporting
construction and maintenance of renewable
generation within the cluster and beyond. 
A more cohesive and consistent image of
wind energy development within the cluster
for surrounding communities and visitors to
the area, as committed development is built
out and future extensions and repowering
consolidate development in the cluster.
An increase in renewable energy generated
from the cluster, from a range of different
renewable energy technologies.
Greater efficiency and reduced
intermittency of renewable energy
generated from individual renewable
technologies.
A streamlined and efficient planning
process, with more predictable
outcomes to determination for
development proposals which align
with the coordinated vision for the
cluster, and the associated grid
transmission and distribution network.
Local Communities
Invested in Energy
Hagshaw Renewable
Energy Hub
Cohesive Wind
Farm Design
Optimised
Renewable Energy
More Predictable
Determinations
Opportunities for promotion and educational interpretation of green energy technologies to
communities and visitors © Richard Carman
Designing Wind Energy of the Future
In order to achieve the optimum generation from wind energy and realise the renewable energy opportunity of the cluster
a more coordinated approach is needed. Through collaboration, between developers, landowners, communities, local
authorities and statutory agencies, agreed principles for the future development and design of wind farms within the cluster
could be achieved.
The cluster hosts some of the oldest commercial wind turbines in the country, with the turbines of Hagshaw Hill at 55m to
blade tip height, whilst the consented turbines of Hare Craig at 230m to blade tip height will represent some of the largest
turbines in Scotland once constructed.
Juxtapositions of small and large turbines will be unavoidable as existing consented developments are built out within the
cluster. However, through the potential extension and future repowering of the older wind farms within the cluster, opportunities
exist to rationalise the overall composition of turbines and deliver greater cohesion and consistency in design, whilst utilising
the very latest and future turbine technology.
Key Design Principles
Some key design principles have been devised to provide a guide to help shape future wind energy development within the
cluster. Further detail is presented in Technical Annex - Wind Energy of the Future.
294

Page 295

Page 25295

Page 296

Enhancing and creating sustainable communities for the future
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 26
2. Resilient & Connected Communities
Supporting thriving, resilient, and diverse communities, which are inclusive, empowered, and safe places
for people is central to delivering Scotland’s National Outcomes. Taking a place-based approach which puts
communities at the centre of decision making allows them to create and shape their own future, and NPF4
is expected to focus on ‘A Plan for Resilient Communities’ as one of its four key outcomes.
Our resilience to climate change will be tested across many aspects of our lives in the coming years. The
places in which we live, work and play, need to be adaptable and multifunctional, and be managed in a
sustainable way which considers both current and future generations.
As advocated by Architecture and Design Scotland (AD&S), the Development Framework promotes a
whole place approach to the challenge of planning for Net Zero, and supports a Just Transition to a low-
carbon future in response to a changing climate. Informed by the Place Principle and the 8 Principles of
Carbon Conscious Places we believe that a coordinated vision for investment across the cluster can deliver
greater resilience to local communities and deliver many of the objectives of existing Community Action
Plans.
The cluster offers extensive opportunities for safe active travel links to be enhanced, extended and created,
linking local communities with access to goods and services – in line with the Scottish Government vision
for 20-minute neighbourhoods. Opportunities to create and strengthen cross boundary links between
communities in East Ayrshire and South Lanarkshire have been identified - linking Muirkirk and Glenbuck,
with Glespin and Douglas via feasible off-road walking and cycling links.
Key Opportunities
Collaborate with communities to coordinate
the development and delivery of Local
Place Plans, informed by Community
Action Plans which have been developed
by organisations working with several
communities around the cluster, and
identify shared benefits from development
within the cluster.
Explore opportunities for improved public
and shared transport links between
communities around the cluster and
the wider region across local authority
boundaries, providing easier access to
public services and amenities (e.g. green
energy fuelled public transport and car
share initiatives).
Involve communities in the planning and
design of enhancements to existing public
realm, townscapes and greenspaces.
Focused on the creation of new, public
spaces in key settlements around the
cluster - with a focus on revitalising
communities.
Promote and support shared local
services and a circular system approach
to community projects. Adoption of a
local coordinated approach to energy
and heat (e.g. Local Heat and Energy
Efficiency Strategies (LHEES)), water, food
production, greenspace, habitat, transport,
waste, travel and housing, to support the
transition to low carbon living.
Improving connectivity between the
communities which surround the
cluster, and across local authority
boundaries – supporting the concept
of ‘small distance places’ (e.g. the 20
minute place concept) accessible via
new active travel walking and cycling
links.
Local
Place Plans
Community
Transport Initiatives
Community
Placemaking
Low Carbon
Living Initiatives
Connected
Communities
Improved connectivity between communities, through the enhancement of existing and creation of new active travel and
public transport links © Richard Carman
296

Page 297

Key Objectives
Page 27
Improved connectivity between communities, through the enhancement of existing and creation of
new active travel and public transport links © Richard Carman
a.) Developments should help   
to create ‘small distance places’   
– providing the infrastructure,   
links and assets that people need   
close to where they live.
b.) Promote opportunities for active   
travel, play, education and   
interaction with nature, such as   
community growing.
c.)  Improve social cohesion     
through delivery of opportunities   
for greater social interaction   
and collaboration amongst   
communities around the     
cluster.
d.) Promote the sharing of assets   
and services to enable lower   
carbon living and connect   
people to their neighbourhoods.
e.) Promote multifunctional land use,   
with an emphasis on community,   
local and regional scale benefits,   
and function.
Identification of appropriate sites for
specific development opportunities on land
around the cluster, which will be resilient
to the challenges of a changing climate
(e.g. avoidance of areas at risk of future
flooding).
Spatial Planning for
Future Resilience
Support the development of local
Community Right to Buy proposals to bring
parcels of land around the cluster into
community ownership and management,
for delivery of community focused land use
initiatives (e.g. energy, recreation, nature
and biodiversity and community growing
etc).
Community
Land Ownership
Creating opportunities for recreation and interpretation, with an
ethos of access for all abilities, whilst engaging people in nature,
biodiversity and the threat of climate change © NatureScot
Promoting sustainable and reliable methods of public
and private transport to connect rural and sem-rural local
communities with the wider region © Jaggery (cc-by-sa/2.0)
297

Page 298

Enhancing and creating sustainable communities for the future
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 28
2. Resilient & Connected Communities
What does success look like?
Communities which have embraced and
delivered on the journey towards low
carbon living and the path to Net Zero,
with reduced energy consumption, energy
efficiencies and climate consciousness
- inspired by the Local Heat and Energy
Efficiency Strategy (LHEES) Pilot
Programme elsewhere in Scotland.
Land brought into community ownership
is delivering environmental, social and/
or economic benefits for communities,
including greater resilience to the
challenges posed by a changing climate.
An improved sense of identity and pride
in local communities and their public and
shared urban and green spaces.
Provision of local services shared amongst
communities which surround the cluster in
line with the Scottish Government vision for
‘20-minute neighbourhoods’.
Greater social and physical connectivity
between communities around the
cluster, including those located across
the boundary of East Ayrshire and
South Lanarkshire
Zero Carbon
Communities
Land that
Works for All
Increased Pride
in Local Place
20 Minute
Neighbourhoods
Enhanced
Connectivity
Key community links
Through consultation with communities and other stakeholders a number of key community links have been identified:
• Muirkirk and Glenbuck, to Glespin and Douglas via the River Ayr Way - a local link providing connectivity
between the isolated conservation village of Glenbuck with neighbouring communities in East Ayrshire and South
Lanarkshire
• Coalburn to Lesmahagow - alternative pedestrian and cyclist link taking people off busy back roads to enable safe
travel between nearby communities.
• Douglas to Coalburn - enhancement of exising corepaths to provide important links between shared essential local
services of neighbouring communities.
• Muirkirk to Coalburn railway line link - the former Caledonian Railway line reimagined as an off-road link which
passes through the cluster, with opportunities for interpretation of heritage and nature along the way.
• Douglas to Happendon and the National Cycle Network (NCN) Route 74 - a ready developed solution to a
long-term opportunity, providing a safe link to the settlement of Douglas via an off-road route from the NCN near
Happendon.
• Regional strategic link between the River Ayr Way and Clyde Walkway - linking two of Scotland’s Great Trails,
via some of the above links opening up regional opportunities to some of Scotland’s extensive long distance routes.
Utilising and enhancing existing and historic infrastructure to create safe and accessible links between
communities, helping people connect and feel connected with their neighbours © Richard Carman
298

Page 299

Page 29299

Page 300

Making space for nature, delivering increased resilience
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 30
3. Coordinated Enhancement of Nature
Potential impacts on wildlife and natural heritage from wind farms in the cluster have been considered through the planning process. Developers
and operators carry out species and habitat surveys to inform Environmental Impact Assessment (EIA) of proposals, and monitor birds,
habitats, and other species during the construction and operation of developments. In many cases, developers and operators have also put
in place Habitat Management Plans (HMPs) to avoid or reduce impacts, whilst restoring and enhancing habitats.
By working together, the cluster offers opportunities to deliver landscape-scale restoration, enhancement and creation of wildlife habitats and
help connect these to other important areas for nature in the surrounding area, in line with the principles of the Glasgow and Clyde Valley
(GCV) Green Network Partnership Blueprint for Strategic Habitat Networks - facilitating the movement of wildlife through the landscape.
In particular, as the impacts of climate change are becoming more evident, the value of peatland habitats as a carbon store is now fully
recognised and improving their condition to increase carbon capture, expand wildlife habitats and deliver Biodiversity Net Gain (BNG) is a
key priority. Opportunities exist within and around the cluster, including within the Muirkirk and North Lowther Uplands Special Protection Area
(SPA), to influence land management decisions and deliver large scale peatland restoration, which as well as helping mitigate climate change,
offers the potential to improve habitat for important birds such as black grouse.
Taking a co-ordinated approach to forest management as areas of plantation are felled and replanted also offers opportunities to improve the
design of woodlands, leaving more space for wildlife, increasing the extent of native woodland, and expanding forest corridors. This could
include opportunities to support and complement the objectives of the Clyde Climate Forest Initiative and neighbouring landowners, such
as Forestry Land Scotland. The introduction of larger modern turbines may allow for alternative approaches to management of productive
forestry in the cluster - such as key hole felling with long-term cycles of felling and restocking beneath operational turbines.
Through investment in the enhancement of existing habitats and ecosystems, we believe these natural capital assets can provide social,
environmental and economic benefits, and contribute to the wellbeing of those who live and work in neighbouring communities.
Key Opportunities
Working in tandem with local groups such
as the South Strathclyde Raptor Study
Group and the East Ayrshire Coalfield
Environment Initiative, promote the
collection of wildlife information, supporting
education, training and development of
wildlife monitoring skills.
Improve access and interpretation in areas
of existing and enhanced greenspace,
to make it easier for people to view and
learn about wildlife, as part of promoting
recreation and tourism, whilst ensuring
wildlife is also protected from disturbance.
The preparation of a collaborative habitat
management plan between landowners
and managers to guide the coordinated
management of land use across the cluster.
Balancing existing and future land uses,
including woodland and forestry expansion,
habitat enhancement and peatland
restoration, agriculture, and access.
Develop conservation plans for black
grouse and other moorland birds, including
curlew, golden plover, and hen harrier,
working with landowners and managers,
to protect existing key areas for these
species and identify other suitable areas for
appropriate conservation management.
Develop a peatland restoration strategy
for land within the cluster to maximise
carbon capture and peatland habitat
restoration opportunities, combining
existing information on peatland extent,
depth, and condition, with coordinated
additional new surveys.
A Local Nature
Knowledge Network
Improved
Access to Nature
Coordinated Habitat
Management Plan
Priority Species
Conservation Plans
Peatland
Restoration
Creation, enhancement and restoration of habitats to support key priority species in the
cluster and promote connectivity with other similar habitats © Richard Carman
300

Page 301

Key Objectives
Page 31
a.) Protect the integrity of internationally 
and nationally designated areas,   
and important habitats and species 
during development of renewable   
energy and other projects in the   
cluster.
b.) Promote a landscape scale   
approach to the enhancement   
and restoration of habitats across   
the cluster.
c.)  Support improved and     
coordinated management of   
habitats so important habitats   
and species benefit.
d.) Promote new revenue streams   
for land managers from wildlife   
conservation, peatland     
restoration and native woodland   
expansion.
e.) Explore opportunities to fund and   
deliver other ecosystem services,   
particularly for reducing flood risk   
and improving water quality.
Creation of an agri-environment network
amongst landowners, managers, farmers,
and foresters to highlight opportunities
for funding habitat restoration and
enhancement works to maximise
agriculture, forestry, biodiversity and climate
change benefits from land across the
cluster.
Agri-Environment
Network
Develop opportunities for educational visits
and study programmes by children and
young adults from educational settings in
communities around the cluster and the
wider region (e.g. schools and colleges),
as well as adults via nature focused
community groups and organisations.
Nature
Education
Development of a centralised and
coordinated depository for habitat, peat
and protected species EIA survey and
monitoring data. Being developed by
RPS, it will be accessible to developers,
operators, statutory agencies and local
authorities to support the efficient future
delivery of renewable energy development
within the cluster
Shared Survey &
Monitoring Data Bank
PHOTO
PHOTO
Habitat enhancement to benefit key priority species, such as Hen Harrier
within the Muirkirk and North Lowther Uplands SPA © NatureScot
Opportunities for peatland restoration, locking up carbon and contributing
towards Net Zero © NatureScot
A collaborative approach to surveys and monitoring, bringing cost and
programme efficiencies, and availability of shared data © LUC
Black Grouse habitat enhancement is a key focus across the cluster. By
working together we can deliver a more coordinated response © NatureScot
PHOTO
301

Page 302

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 32
3. Coordinated Enhancement of Nature
What does success look like?
Habitat Management Plans will have
contributed to the delivery of, the peatland
restoration strategy, and land management
plan, and populations of golden plover,
curlew, black grouse, hen harrier and other
wading birds will have stabilised and show
signs of sustained recovery.
An increased number of local people will be
involved in wildlife monitoring and survey,
collecting information that can help guide
habitat management, restoration and be
used to help avoid disturbance to wildlife.
A coordinated habitat management plan will
be in place for the cluster, supporting the
management and expansion of sensitively
designed productive conifer plantation, and
native mixed woodland, building habitat
corridors, enhancing the landscape, and
contributing to increased carbon capture/
sequestration.
Wildlife surveys needed for planning
applications in the cluster will be more
focused through access to a shared
databank of existing records, and the need
for post-construction species and habitat
monitoring will be focused on the priority
species list above.
Information will be available on the
extent and condition of all important
peatland areas in the cluster and
will have been used by local land
managers and local contractors to
deliver peatland restoration.
Habitat Management
& Enhancement
Engagement
in Nature
Coordinated
Land Management
Shared
Survey Efforts
Restored
Peatland Habitats
Opportunities for peatland restoration and the delivery of other nature based
solutions in response to the challenges of a changing climate and the biodiversity
crisis © Richard Carman
Promotion and support for agri-environment schemes and exploration of new
models such as agro-forestry to diversify income streams and maximise carbon
benefits © Richard Carman
Cluster Wide Habitat Management Plan
The sharing of existing habitat management and monitoring data
between developers and operators, landowners, agencies and other
stakeholders, will inform the development of a Cluster Wide Habitat
Management Plan.
The schematic plan opposite identifies the broad areas of opportunity
for the restoration, enhancement and creation of peatland and
habitats for key priority species found across the cluster. This has
been devised using existing survey information and data, and will be
supplemented by future survey and monitoring work with more detail
to be developed in the Action Plan during summer 2022.
Through a more coordinated and focused approach it is envisaged
that the cluster could offer extensive opportunities for enhanced
ecosystem services e.g. climate change mitigation, flood mitigation,
and benefit the following key priority species:
Making space for nature, delivering increased resilience
• Black Grouse
• Hen Harrier
• Merlin
• Peregrine
• Short-eared Owl
• Golden Plover
• Curlew
302

Page 303

Page 33303

Page 304

Respect and interpret the natural and cultural heritage of the area
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 34
4. A Strong Identity of Heritage, People and Place
The cluster and the surrounding communities of East Ayrshire and South Lanarkshire are rich in their cultural
and industrial heritage. The development of many of these communities was shaped by their support for
the coal mining and associated industries, and they were once bustling industrial hubs supplying coal to
Scotland’s industrial heartlands and the ship building industry on the Clyde.
Communities are rightly proud of the history which has shaped their identity and preserving some of the
remaining physical and cultural elements of this will be important as communities transition towards a low
carbon future. The natural heritage of the area has also shaped its strong identity, from the rolling hills of
open moorland and coniferous woodland to the river valleys of the River Ayr and Douglas Water, there is a
rich and diverse history of land use across the area which continues to evolve.
A lack of employment options post closure of traditional industries has adversely affected coalfield
communities for many years, and has often seen economic, educational and health challenges intensify in
some areas. Opportunities exist to enhance awareness and pride in communities around the positive role
renewable energy plays within the surrounding communities, and the contribution made locally towards
achieving Net Zero.
The economic benefits arising from renewable energy development within the cluster could make substantial
improvements to the lives and opportunities of people in local communities. Ensuring that these benefits
are delivered fairly and inclusively, whilst respecting the existing cultural heritage and historical identity of
communities is a significant challenge, but one which the Development Framework will seek to achieve
through collaboration and the involvement of communities.
Key Opportunities
Enhancement of the distinctive local
landscape character of the area, including
the key characteristics of unique natural
and man-made local landscapes and
features, including renewable energy as an
established feature within the landscape,
and the qualities of the Douglas Valley
Special Landscape Area (SLA).
Identify opportunities to address the
legacy issues of open cast coal mining
in a positive way, such as restoration of
former open cast coal mining sites to create
new greenspaces and points of interest to
attract visitors and deliver environmental,
social and/or economic benefits for local
communities.
Enhancement of the current condition and
understanding of historic conservation
areas within settlements and communities
surrounding the cluster, and involve
communities in the sympathetic
planning and design of public realm and
greenspaces within these areas.
Restoration and enhancement of
industrial heritage assets within and
surrounding the cluster, with potential
heritage trails linking key cultural and
historic assets which have influenced
the current identity of the area.
Enhancing Local
Landscape Character
Reinvented
Mineral Workings
Enhancing
Conservation Areas
Industrial
Heritage Trails
Enhancement of existing and creation of new public spaces within settlements around the cluster, which respect the historic
character and sense of place © Richard Carman
Glenbuck Viaduct, the remnants of a long lost village representing the
strong socialist heritage of the area © Richard Webb (cc-by-sa/2.0)
304

Page 305

Page 35
a.) Improve aesthetic value and   
reinforce the existing sense of   
place of the area.
b.) Respect and interpret local and   
regional heritage and history of   
area and its communities.
c.)  Enhance awareness and   
connectivity of cultural assets   
in the area, and their relationship   
to assets beyond the     
cluster.
d.) Instil a sense of pride in place   
for communities and visitors   
alike, offering a unique and   
identifiable local and regional   
destination.
e.) Ensure place quality and the low   
carbon agenda is prioritised in all   
decisions and investments.
f.)  Interested parties, developers   
and operators, and communities   
to work together through a   
place-based approach to develop   
opportunities.
Key Objectives
Opportunities to reflect on and celebrate the past landuse, industry and employment of coal mining which has shaped the communities and
landscape around the cluster, such as the including the Spireslack geological features - a Scottish Carboniferous Research Park © Richard Carman
iaduct, the remnants of a long lost village representing the
ebb (cc-by-sa/2.0)
The unique exposed geology and scarred landscape of the former
Scottish Coal site at Spireslack. Glenbuck.© Alan Pitkethley (cc-by-sa/2.0)
The remains of Douglas Castle originating from the 13th century, is a site
with a rich history and vantage over the cluster © Billy McCrorie (cc-by-sa/2.0)
305

Page 306

Respect and interpret the natural and cultural heritage of the area
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 36
4. A Strong Identity of Heritage, People and Place
What does success look like?
Improved high quality public realm and
open spaces within local communities,
creating healthy, happy places to invest,
live, work and play within.
Restoration of former open cast coal mining
sites, delivering environmental, social and/
or economic benefits for communities.
Reflection and interpretation of local
heritage and history in the planning and
design of new development and green
infrastructure within the cluster.
Enhanced understanding and knowledge
of what has shaped the distinctive identity
of the area and its communities through
locally and regionally promoted heritage
interpretation. (e.g. potential heritage trails).
Greater involvement of communities in
the planning and design of their local
‘place’, including public realm and
green spaces within key settlements.
Strengthening of distinctive local
landscape character.
Sympathetic
Urban Enhancement
Evolution of
Mining Heritage
Maintained
Local Heritage
Enhanced
Interpretation
Local Place
Identity
Maintaining the integrity and character of the Douglas Valley Special Landscape Area (SLA) has been a key priority for the development of wind farms within the cluster.
Opportunities to enhance and enrich the cultural and industrial heritage of the area will be explored as the area transitions to renewables, and land use evolves © Richard Carman
306

Page 307

Page 37307

Page 308

Promoting and supporting a local economy which delivers locally
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 38
Key Opportunities
The Hagshaw Energy Cluster has contributed to the local and regional economy for many
years. The cluster has the potential to deliver far more opportunities and benefits to the local
communities of both East Ayrshire and South Lanarkshire.
The local area is in need of an economic boost, with relatively high deprivation, particularly
in employment and income, and has an older population suggesting a lack of opportunities
for young people. As Scotland transitions towards a Net Zero economy, the impacts, and
benefits of doing so must be fair – a Just Transition. By promoting a more strategic approach
to development, with greater certainty and efficiency of investment, the local area could
benefit from more sustainable employment opportunities.
Future committed and proposed wind energy development within the cluster alone is
predicted to result in capital investment of up to £525 million, with an operational spend of
approximately £18 million annually. A greater share of this investment could flow directly into
the local economy and wider region through a more coordinated approach.
Key sectors and employment areas in the local area include:
• Construction (17% of employment)
• Accommodation and food services (10%)
• Transportation and storage (8%)
• Professional, scientific and technical activities (5%)
5. Inclusive, Sustainable Growth
Creation of a recreation and tourism
strategy for the cluster to identify
opportunities for outdoor recreation, and
visitor and tourism attractions focused on
education and learning about renewable
energy and nature.
The creation of a regional ‘Renewable
Energy Hub’ which supports the
construction, servicing and maintenance,
and eventual decommissioning and
repowering of developments within the
cluster and wider region, whilst supporting
other Net Zero business opportunities.
A collaborative procurement strategy with
an aim of ensuring that existing and new
local and regional businesses secure a
greater proportion of tender opportunities.
Identification and enhancement of existing
skills within the local and regional economy
which could be utilised and developed to
support local, long-term and sustainable
jobs in the green economy, building on
the example of the Connect2Renewables
initiative.
Coordinated by the Douglas Valley
Initiative Economic Development
Officer. Development of a strategy
to maximise and realise the regional
economic opportunities from a
collaborative approach to development
within the cluster.
Tourism &
Visitor Strategy
Hagshaw Renewable
Energy Hub
Coordinated Local
Procurement
Diversifying &
Building Local Skills
Strategic
Investment Plan
Productive timber forests are a key landuse within the cluster
the processing of timber locally for construction and biomass supply chains 
The construction and long-term maintenance of the existing and committed wind energy developments could
be facilitated via shared construction and lay-down areas within a Renewable Energy Hub © Richard Carman
308

Page 309

Page 39
a.) Maximise opportunities to   
support the development of   
local supply chain and skills   
as part of a green and circular   
economy.
b.) Promote longer term investment   
in infrastructure, through  longer   
duration or in perpetuity consents   
for renewable energy developments 
and development envelopes.
c.)  Ensure that communities benefit   
from the opportunity offered by   
the transition to a low carbon   
future.
d.) Deliver more effective and larger   
scale benefits to communities   
and the environment by working   
together to manage and     
invest community benefit   
funds.
e.) Promote opportunities for shared   
community ownership/location   
and investment in renewable   
energy development by     
communities.
Key Objectives
The prospect of new industrial and logistics development at the Conexus hub adjacent to the M74
brings opportunities to establish a green energy hub and local employment © 3R Energy
Productive timber forests are a key landuse within the cluster, with opportunities to expand production and
the processing of timber locally for construction and biomass supply chains  © Richard Carman
The construction of over 300MW of committed wind energy development within the cluster has
the potential to bring temporary and permanent jobs to the local economy © Alan O’Dowd (cc-by-sa/2.0)
Promote a local and regional circular
economy strategy where local skills, and
materials are utilised to create a society
where resources are valued and nothing
is wasted. This could include the eventual
reuse and recycling of renewable energy
infrastructure, such as wind turbines.
Circular Economy
Strategy
309

Page 310

Promoting and supporting a local economy which delivers locally
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 40
Up to £47m
Gross Value Added
(GVA) and 650 job years
during construction
What does success look like?
5. Inclusive, Sustainable Growth
The creation of jobs and businesses
indirectly related to renewable energy
development, and increased visitor
numbers through the creation of new
recreation and tourism opportunities.
Establishment of flagship regional
‘Renewable Energy Hub’ providing
sustainable jobs within renewable
technologies within the cluster and beyond.
An increase in community benefit payments
into communities around the cluster from
deployment of additional renewable energy
development, including wind energy
and co-located technologies, and other
businesses and activities.
Creation of new skilled industries,
businesses and sustainable jobs in the local
and regional green economy.
A decrease in local deprivation and
unemployment, through creation of
opportunities for the local population.
A greater share of capital investment
and annual spend flowing directly into
the local and regional economy from
development within the cluster.
Diversified
Visitor Economy
Renewable
Energy Hub
Investment in
Communities
Skilled Green
Energy Jobs
Enhanced
Local Economy
Financial benefits from wind energy developments are currently delivered through grant initiatives such as the South
Lanarkshire Renewable Energy Fund and Foundation Scotland. With 584MW of committed wind energy development
within the cluster to be delivered in the coming years, this could generate up to £2.7 million in direct annual benefit
payments to communities around the cluster. Subject to community-led decision making on how to use and invest funds,
potential recreation and tourism facilities could bring further economic benefits to communities.
A significant opportunity for employment land exists at the proposed Conexus hub. Promoted as a strategically located
logistics, energy & industrial hub at the crossroads of Scotland, it provides the ideal foundation to establish a new thriving
local economy of industries around green energy.
The committed wind energy development in the cluster could deliver the following economic benefits locally:
A Renewable Energy Hub, creating sustainable jobs supporting the deployment, servicing and
maintenance of renewable technologies within the cluster and beyond © Richard Carman
Up to £6m
GVA and 80 jobs
annually during
operation
Up to £2.7m
per year in community
benefit payments for
25-30 years
Source: Data collated and analysed by Biggar Economics, 2021
310

Page 311

Page 41311

Page 312

Creating opportunities for healthy, happy and active communities
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 42
The Scottish Government is committed to creating a wellbeing economy which secures sustainable, inclusive
growth for everyone, in all parts of Scotland. Promoting opportunities for improved access to outdoor
greenspace and participation in outdoor recreation and learning, regardless of any physical or mental
disability, can help build social cohesion and promote active and healthy lifestyles. This is at the heart of
creating and maintaining sustainable communities, and a National Public Health Priority.
The Development Framework promotes a more inclusive approach to identifying ways to work together to
support and enhance the health and wellbeing of communities and visitors to the area. Whilst extensive
networks of local Core Paths exist within East Ayrshire and South Lanarkshire, the cluster offers opportunities
to deliver aspirational and crossboundary links between communities, as identfied in existing Core Path
Plans.
Promoting active travel, via walking, running, cycling or other alternative means can play a role in improving
physical and mental wellbeing, as well as assisting in the transition to a low carbon economy.
Ensuring communities are connected via functional green networks is a key principle of the GCV Green
Network Partnership Blueprint for Strategic Access Networks - facilitating the off-road movement of people
around and between communities through Green Active Travel routes and greenspace.
The Hagshaw Energy Cluster also offers a unique opportunity to promote the area as a regional visitor
destination for organised outdoor recreation and adventure sports, accessible to large population centres
via the M74 and A70 road links, with an initial focus on areas in the south and east of the cluster, close to
communities, local businesses and other existing local amenities.
6. Outdoor Recreation to Support Health and Wellbeing
Enhanced outdoor spaces to live, work and play in and creation of opportunities
for community and visitor destinations © Richard Carman
Enhanced and new infrastructure for recreational activities within the extents of the cluster and
neighbouring communities © Richard Carman
Key Opportunities
Development and delivery of an active
travel strategy which provides local links
between communities, and wider regional
links to communities and the River Ayr Way,
Clyde Walkway, and the National Cycle
Network east of Douglas.
Development of a recreation and access
strategy for the whole cluster which
identifies coordinated opportunities for
promoting responsible access, connectivity
and delivery of infrastructure, whilst
respecting the nature, existing land use and
communities, and management of existing
crime and antisocial behaviour.
Delivery of high-quality infrastructure
for formal and informal outdoor play
in communities around the cluster,
e.g. traditional and natural play areas,
pump track for cycling, roller skating,
skateboarding etc.
Delivery of safe active travel links for
walking and cycling between the key
communities surrounding the cluster.
Including Lesmahagow, Coalburn, Douglas,
Glespin and Muirkirk, reducing the need
to travel by car, and improving residents
health and well-being.
Enhancement and creation of
connected formal and informal outdoor
open spaces which are accessible to
all – within the key communities around
the cluster, and connected by an
enhanced and maintained Core Path
Network.
A Regional Active
Travel Network
Access &
Recreation Strategy
Active Play
for All Local Active
Travel Links
Connected Local
Green Spaces
312

Page 313

Page 43
Enhanced and new infrastructure for recreational activities within the extents of the cluster and
a.) Promote outdoor recreation across   
the cluster and beyond, to support   
the physical and mental health and   
wellbeing of local communities and   
visitors to the area.
b.) Maximise the suitability of existing   
paths and roads and to provide   
a coherent network of access   
opportunities.
c.)  Deliver enhanced local and regional 
active travel and transport networks, 
with links to wider walking and cycling 
routes.
d.) Develop and promote the cluster   
as a hub destination for organised   
formal recreation such as walking,   
running, mountain biking, e-biking   
etc.
e.) Promote opportunities for inclusive   
outdoor recreation, through   
infrastructure which provides   
access for all abilities.
Key Objectives
Creation of an outdoor and adventure
recreation hub which promotes use of
existing infrastructure, such as on site wind
farm access tracks for walking, running
and mountain biking, e-biking (powered by
renewable energy), creating a local identity
and providing facilities for visitors and local
employment opportunities.
Outdoor Recreation
& Adventure Hub
The network of existing wind farm access tracks offer endless opportunities for physical recreation
and exploration, similar to the successful Whitelee Wind Farm - now renowed as Greater
Glasgow’s ‘largest park’  © Alan O’Dowd (cc-by-sa/2.0)
PHOTO
Providing public access to woodlands and forests around the cluster and surrounding area to
support both mental health and wellbeing. Spending time in woodlands has been proven to have a
positive effect on alleviating conditions such as depression and anxiety © LUC
313

Page 314

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 44
Recreation and tourism hub facilities to promote and support local and regional visitors to the
cluster, and diversified employment opportunities © Richard Carman
What does success look like?
6. Outdoor Recreation to Support Health and Wellbeing
Increased participation and visitor numbers
to the area through the creation of new
active travel links through the area, and
recreation and tourism opportunities.
Establishment of a hub destination for
outdoor recreation and adventure sports
which is identifiable and promoted
locally and regionally for the benefit of
communities and visitors alike e.g. a
potential Outdoor E-bike National Centre,
powered by renewable energy.
Improved access to high quality open
spaces connected by green corridors for
local communities, creating healthy, happy
places to invest, live, work and play within.
A network of diverse, accessible and high
quality rides and trails for all abilities of
cyclist e.g. mountain/family/beginner/trials/
pump-track.
Networks of paths for walking, cross
country skiing and roller skiing activities.
Improved health and wellbeing of
all age groups within communities,
through access to opportunities for
outdoor recreation and adoption of
more active lifestyles.
Enhanced Active
Travel Links
An Outdoor
Destination
High Quality
Open Space
An Active
Landscape
Contribution to
Healthier Lifestyles
Waymarked trails for mountain or gravel biking, walking or horse riding
to be developed around the cluster, initially focusing on areas close to
population centres and existing amenities © Valenta (cc-by-sa/2.0)
Creating safe and secure opportunities for commuting via active
modes of transport between communities and potential employment
centres © LUC
Creating opportunities for healthy, happy and active communities
314

Page 315

Page 45315

Page 316

Reinvented Mineral Workings
Reflecting and celebrating the past
landuse, industry and employment
of coal mining which has shaped the
communities and landscape around
the cluster, including the including
the Spireslack geological features - a
Scottish Carboniferous Research Park.
Enhanced Connectivity
Improved connectivity between communities, through
the enhancement of existing and creation of new
active travel and public transport links - and linking
of existing long distance promoted trails such as the
River Ayr Way and Clyde Walkway.
Repurposing of Existing Infrastructure
Utilising and enhancing existing and
historic infrastructure to create safe and
accessible links between communities,
helping people connect and feel
connected with their neighbours, whilst
adding valuable opportunities for safe
recreation.
Restoration of Valuable Peatlands
Opportunities for peatland restoration
and the delivery of other nature based
solutions in response to the challenges of a
changing climate and the biodiversity crisis.
The Hagshaw
Energy Cluster
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 46
Future of the Hagshaw Energy Cluster...
Coordinated Enhancement of Nature
Creation, enhancement and restoration
of habitats to support key priority
species in the cluster and promote
connectivity with other similar habitats.
316

Page 317

Inclusive, Sustainable Growth
The construction and long-term maintenance
of the existing and committed wind energy
developments could be facilitated via shared
construction and lay-down areas within a
Renewable Energy Hub.
A Strong Identity of Heritage, People and Place
Enhancement of existing and creation of new
public spaces within settlements around the
cluster, which respect the historic character and
sense of place.
An Outdoor Destination
Recreation and tourism hub
facilities to promote and support
local and regional visitors to the
cluster, creating diversified business
and employment opportunities.
Enhanced Agricultural Practices
Promotion and support for agri-environment
schemes and exploration of new models
such as agro-forestry to diversify income
streams and maximise carbon benefits.
© Richard Carman, 2022
The Hagshaw
Energy Cluster
Page 47
Outdoor Recreation to Support
Health and Wellbeing
Enhanced and new infrastructure
for recreational activities within
the extents of the cluster and
neighbouring communities.
Optimised and Diversified
Renewable Energy Generation
Integration of other renewable
energy technologies alongside
wind energy development to
maximise renewable energy
generation and efficiency.
317

Page 318

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 48
This technical annex sets out key design principles for wind energy development within the cluster, including new projects,
extensions and the repowering of existing sites.
The Development Framework does not seek to define the extent of the cluster, which, to date, has been largely influenced
by the following designated areas and physical features:
• The River Ayr Valley to the south-west, and River Douglas Valley, encompassing part of the Douglas Valley Special
Landscape Area (SLA) to the south, south-east;
• The presence of the settlements of Coalburn, Douglas, Glespin, Lesmahagow and Muirkirk, and scattered residential
properties to the south, south-east, east and north-east;
• The M74 corridor to the east, and the A70 to the south within the Douglas Valley; and
• The presence of the Muirkirk and North Lowther Uplands SPA and Muirkirk Uplands SSSI to the west and south-west.
The presence of the above, and the suitability of the Rolling Moorland landscapes found across the cluster and now
defined as the Plateau Moorland Landscape Character Type (LCT), to accommodate large scale wind energy development
has influenced the organic evolution of the cluster over the past 25 years. It is anticipated that these considerations will
continue to influence and inform future wind energy development in the cluster.
The annex does not replace or supersede existing Supplementary Guidance published by East Ayrshire and South
Lanarkshire Council’s, such as the South Lanarkshire Landscape Capacity Study for Wind Energy (2016), but instead
complements this where relevant, and sets out a locally specific design response for future wind energy development in the
Hagshaw Energy Cluster.
Technical Annex
Wind Energy of the Future
Design and Assessment Viewpoints
The key design and assessment viewpoints have been informed by desk and field based survey, and a review of past LVIAs
for developments within the cluster. The relevance of each viewpoint to the design and assessment of specific proposals will
be dependent on the location, extent and scale of wind energy development proposed. Not all viewpoints will necessarily be
included in future assessments – this is a standard list from which to identify the best ones to use for each project which are
likely to capture the key considerations.  In collaboration with relevant stakeholders, viewpoint(s) should be agreed on a case
by case basis and may be microsited to represent maximum visibility and the highest sensitivity receptors.
The approximate location of each viewpoint is shown on the map (right), and a description of the key receptors detailed below:
• A - Muirkirk - Representing views from the historic settlement and important cultural landscape within East Ayrshire.
• B - River Ayr Way - Representing views experienced by recreational users of the long distance walking route through
East Ayrshire, following the River Ayr from source to sea.
• C - Glenbuck - Located in the historic conservation village of Glenbuck in East Ayrshire, and representing views
experienced by local residents and visitors to village and nearby Ponesk-Spireslack FLS site.
• D - Glespin - Representing views experienced by residents within this small settlement located on the A70 within the
Douglas Valley SLA.
• E - Douglas - Viewpoint to represent settlement located on the A70 within the Douglas Valley SLA to the south-east of
the cluster, and protected heritage assets of Douglas Castle and Douglas Conservation Area.
• F - M74/A70 near Uddington - To represent views experienced by receptors travelling on the M74 and A70, and nearby
NCN Route 74, and within the Douglas Valley SLA.
• G - Coalburn - Representing views from the settlement east, north-east of the cluster.
• H - B7078/NCN Route 74 - Viewpoint represents views experienced by receptors travelling on the B7078 and NCN
Route 74 to the east of the cluster.
• I - Lesmahagow - Viewpoint to represent settlement located to north-east of the cluster.
• J - Logan Water - Viewpoint located at transition to Plateau Farmland LCT and Upland River Valley LCT to north, north-
east of the cluster.
• K - B743 Muirkirk - Strathaven - Located on the B743 passing through the upland Plateau Moorland LCT between
Muirkirk and Strathaven.
• L - Loudon Hill - Viewpoint located at local hill summit near Darvel in East Ayshire and within protected Inventory
Battlefield. Representing views experienced by recreational receptors.
• M - Cairn Kinney - Located at hill summit in Southern Uplands of South Lanarkshire to the south of the cluster,
representing views experienced by recreational receptors.
• N - Cairn Table - Located at hill summit in Southern Uplands on boundary between East Ayrshire and South Lanarkshire
to the south-west of the cluster, representing views experienced by recreational receptors from edge of East Ayrshire
Sensitive Landscape Area.
• O - Rigside - Viewpoint to represent settlement located on A70 above the Douglas Valley to east of the cluster.
• P - Blackhill Cairn Fort - Viewpoint at site of Scheduled Monument (SM) to the north-east of the cluster and overlooking
the Middle Clyde Valley.
• Q - Tinto Hill - Regionally distinctive landmark hill within the Upper Clyde Valley & Tinto SLA to the east of the cluster.
• R - Lowther Hill - Regionally distinctive landmark hill on the Southern Upland Way long distance trail, and within the
Leadhills and Lowther Hills SLA (location not shown on map).
• S - Middlefield Law - Local hill summit to the north of the Ayr Valley and settlement of Muirkirk, within the East Ayrshire
Sensitive Landscape Area.
Key Design Principles
These design principles provide a guide to help shape further wind energy development within the cluster. They should
be used at the scoping stage to inform both design and assessment throughout the EIA / Landscape and Visual Impact
Assessments (LVIA) process, informed by the existing principles of good wind farm siting and design and alongside other
planning policy and guidance.  They do not alter or supersede existing planning policy, but are provided to help inform
scoping and subsequent assessment.
• Protect the residential amenity of the closest residents and communities to the cluster by avoiding
unacceptable, adverse impacts informed by the EIA process;
• Relate to and where possible enhance the existing underlying landscape character of the area,
taking account of existing wind farm developments and delivering the landscape opportunities set
out in this Framework;
• Protect the integrity of locally designated landscapes (e.g. Douglas Valley Special Landscape Area
(SLA) and East Ayrshire Sensitive Landscape Area), by avoiding unacceptable, adverse impacts;
• Avoid visual coalescence with other nearby wind farms or clusters of wind farms beyond the
cluster; and
• Promote greater consistency and cohesion in turbine composition and scale across the cluster
e.g. turbine spacing, elevation, rotor diameter and/or blade tip height.
318

Page 319

Page 49319

Page 320

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 50
Glossary of Terms
20 minute neighbourhood - A method of achieving connected and often compact neighbourhoods
designed in such a way that people can meet the majority of their daily needs within a reasonable
walk, wheel or cycle (within approx. 800m) of their home.
Active travel - Making journeys by physically active means, like walking or cycling.
Biodiversity - The variability in living organisms and the ecological complexes of which they are
part. This includes diversity within species, between species and of ecosystems (UN Convention
on Biological Diversity, 1992).
Biodiversity Net Gain (BNG) - an approach which aims to leave the natural environment in a
measurably better state than beforehand.
Blue infrastructure - Water environment features within the natural and built environments that
provide a range of ecosystem services. Blue features include rivers, lochs, wetlands, canals, other
water courses, ponds, coastal and marine areas.
Brownfield - Land which has previously been developed. The term may cover vacant or derelict
and, land occupied by redundant or unused buildings and developed land within the settlement
boundary where further intensification of use is considered acceptable.
Carbon sequestration - The long-term removal, capture, or sequestration of carbon dioxide from
the atmosphere to slow or reverse atmospheric carbon diaoxide (CO2) pollution and to mitigate or
reverse climate change.
Circular economy - A circular economy is one that is designed to reduce the demand for raw
material in products; to encourage reuse, repair and manufacture by designing products and
materials to last as long as possible in line with the waste hierarchy.
Community - A body of people. A community can be based on location (for example people who
live or work in or use an area), common identity (for example a shared ethnicity, language, age) or
common interest (for example the business community, amenity, sports, social or heritage groups).
Conservation Area - Conservation areas are areas which have special architectural or historic
interest that are considered worthy of protection. To be designated as a conservation area it must
meet the criteria of ‘special architectural or historic interest the character or appearance of which
is desirable to preserve or enhance’, as set out in Section 61 of the Planning Listed Buildings and
Conservation Areas (Scotland) Act 1997.
Community Hub - A community hub is a multipurpose centre, such as a community centre,
medical centre or school, that provides a range of high quality and cost effective services to the
local community, with the potential to develop new services in response to changing community
needs.
Community facilities - Buildings or services used by the community, including community halls,
recreation centres, libraries, etc.
Cumulative impact - Impact in combination with other development. That includes existing
developments as appropriate, those which have permission, and valid applications which have not
been determined. The weight attached to undetermined applications should reflect their position in
the application process.
Decarbonisation - Reducing the amount of gaseous carbon compounds released by buildings,
activities or operations.
Ecosystem services - The benefits people obtain from ecosystems
Energy storage - Energy storage is the capture of energy produced at one time for use at a later
time to reduce imbalances between energy demand and energy production.
Environmental Impact Assessment (EIA) - A process of evaluating the likely significant
environmental impacts of a proposed project or development, taking into account inter-related
socio-economic, cultural and human-health impacts, both beneficial and adverse.
Flood Risk - The combination of the probability of a flood and the potential adverse consequences
associated with a flood, for human health, the environment, cultural heritage and economic activity.
Forestry and Woodland Strategy - A strategy prepared by a planning authority either singly
or in collaboration with other planning authorities, which sets out policies and proposals for the
development of forestry and woodlands in their area, according to the Planning (Scotland) Act
2019.
Green hydrogen - Hydrogen and oxygen produced by splitting water by electrolysis, stored
hydrogen can then be used to provide heat and power, with only oxygen vented to the atmosphere
with no negative impact. To achieve electrolysis requires electricity, which can be generated from
renewable energy sources such as wind.
Green infrastructure - Features or spaces within the natural and built environments that provide a
range of ecosystem services.
Green networks - Connected areas of green infrastructure and open space, that together form an
integrated and multi-functional network.
Green Space - Space which provides a recreational function, an amenity function, or aesthetic
value to the public such as areas of grass, trees, other vegetation and water.
Habitat Management Plan (HMP) - Provide a guide for land managers to facilitate works that will
result over time in maintenance of, or increase in, the biodiversity value of retained and/or newly
created habitats.
Historic Environment - The physical evidence for human activity that connects people with place,
linked with the associations we can see, feel and understand.
Just Transition -The Climate Change Act 2019 embeds the principles of a just transition; this
means as we reduce our emissions and respond to a changing climate, our journey is fair and
creates a better future for everyone – regardless of where they live, what they do, and who
they are. It is both the outcome – a fairer, greener future for all – and the process that must be
undertaken in partnership with those impacted by the transition to net zero. It supports a net zero
and climate resilient economy in a way that delivers fairness and tackles inequality and injustice.
Landscape Character - Created by the way the physical and cultural components of the
landscape come together and can be defined as “a distinct, recognisable and consistent pattern
of elements in the landscape that makes one landscape different from another”. Scotland has a
digital map-based national landscape character assessment (published in 2019) which defines
Landscape Character Types (LCTs) across Scotland.
Landscape and Visual Impact Assessment (LVIA) - The process of evaluating the landscape
and visual effects of a development proposal, as a component of a multi-topic Environmental
Impact Assessment (EIA).
Local Landscape Designation - Designated landscapes where the scenery is highly valued
locally. Defined and protected by policy at a local level across Scotland, where local development
plans show their location (and associated policy). Referred to as Special Landscape Areas (SLAs)
in South Lanarkshire and Sensitive Landscape Areas in East Ayrshire.
Masterplan - A strategic scheme within which a location is proposed to be regenerated or changed
in order to meet a perceived challenge or strategic need.
Natural Capital - Natural capital is a term for the habitats and ecosystems that provide social,
environmental and economic benefits to humans. Scotland has a wide range of these habitats and
ecosystems - each of which makes a unique contribution to the wellbeing of those who live and
work in Scotland.
Nature based solutions - Nature-based solutions use nature to help tackle environmental and
social challenges, providing benefits to people and nature, and help us to mitigate and adapt to
climate change.
Nature network - A Nature Network is a joined-up system of places important for wild plants and
animals, on land and at sea. It allows plants, animals, seeds, nutrients and water to move from
place to place and enables the natural world to adapt to change, providing plants and animals with
places to live, feed and breed. Effectively functioning nature networks will connect existing nature
rich areas through habitat corridors, habitat ‘stepping stones’ or habitat restoration areas.
Net Zero - Scotland has set a target to become ‘Net Zero’ by 2045. This means the amount of
greenhouse gas emissions we put into the atmosphere and the amount we are able to take out will
add up to zero.
Open space - Space within and on the edge of settlements comprising green space or civic areas
such as squares, market places and other paved or hard landscaped areas with a civic function.
Placemaking - Placemaking is the process of creating good quality places that promotes people’s
health, happiness and wellbeing. It concerns the environment in which we live; the people that
inhabit these spaces; and the quality of life that comes from the interaction of people and their
Priority species - Animals, plants and habitats included on the Scottish Biodiversity List
considered to be of principal importance for biodiversity conservation in Scotland.
Renewable Energy - Renewable energy, often referred to as green energy, comes from natural
sources or processes that are constantly replenished from a source that is not depleted when
used. Renewable sources of energy, such as wind, wave, tidal, solar, hydro and biomass are
widely available and can substitute sources of fossil fuel.
Sustainable development - Development that meets the needs of the present without
compromising the ability of future generations to meet their own needs. (The Brundtland Definition.
Our Common Future, The World Commission on Environment and Development, 1987.)
320

Page 321

Page 51
List of Stakeholders
Blackwood and Kirkmuirhill Co-ordination Group
Blackwood and Kirkmuirhill Community Resilience group
British Horse Society
British Trust for Ornithology (Ayrshire and Cumbrae)
Butterfly Conservation Scotland
Carluke Community Council
Carluke Development Trust
Central Scotland Bat Group
Central Scotland Green Network
Clyde River Foundation
Clydeplan
Coalburn Community Council
Coalfields Communities Federation
Coalfields Regeneration Trust
Community Action Lanarkshire
Community Land Scotland
Community Links Scotland
Development Trusts Association Scotland
Douglas Community Council
Douglas Water and Rigside Community Council
Douglasdale Recreation, Environment, Access, and Leisure Group
East Ayrshire Coalfield Environment Initiative Board
East Ayrshire Council
East Ayrshire Leisure
East Ayrshire Woodlands
Fisheries Management Scotland
Forestry and Land Scotland
Foundation Scotland
Glasgow and Clyde Valley Green Network Partnership
Greenspace Scotland
Heads of Planning Scotland
Historic Environment Scotland
John Muir Trust
Joint Radio Company
Lanarkshire Area Tourism Partnership
Landscape Institute / Landscape Institute Scotland
Lesmahagow Community Council
Lesmahagow Development Trust
Local Energy Scotland
Muirkirk Community Council
Muirkirk Enterprise Group
National Farmers Union of Scotland
NATS Safeguarding
NatureScot
Ofgem
Outdoor Access Trust for Scotland
Paths for All
Public Health Scotland
Rigside & Douglas Water Residents and Tenants Association
Royal Society for the Protection of Birds
RSPB Scotland
Sandford/upper Avondale Community Council
Scottish Development International
Scottish Enterprise
Scottish Environmental Protection Agency
Scottish Forestry
Scottish Government
Scottish Government Energy Consents Unit
Scottish Land and Estates (Clydeside)
Scottish Outdoor Access Network
Scottish Renewables
Scottish Water
Scottish Wildlife Trust
ScottishPower Energy Networks
Scotways
Skills Development Scotland
South Lanarkshire Biodiversity Partnership
South Lanarkshire Council
South Scotland Red Squirrel Group
South Strathclyde Raptor Study Group
Spirit of Lanarkshire Wind Energy Co-operative
St. Brides Community Group, Douglas
Stonehouse Community Council
Sustrans Scotland
The Coal Authority
The Ramblers Association
The Rural Development Trust Ltd
University of the West of Scotland
Visit Scotland
Voluntary Action South Lanarkshire
West of Scotland Archaeology Service
Zero Waste Scotland
321

Page 322

A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
Page 52
References
Architecture and Design Scotland (2020). Designing for a Changing Climate: Planning Reform. Available online: https://www.ads.org.uk/wp-content/
uploads/Designing-for-a-Changing-Climate-Planning-Reform.pdf
Architecture and Design Scotland (2020). Designing for a Changing Climate: Carbon Conscious Places. Available online: https://www.ads.org.uk/
wp-content/uploads/Carbon-Conscious-Places-Main-Report.pdf
Biggar Economics (2021). Wind Farm & Tourism Trends in Scotland: Evidence for 44 Wind Farms. Available online: https://biggareconomics.co.uk/
wp-content/uploads/2021/11/BiGGAR-Economics-Wind-Farms-and-Tourism-2021.pdf
BVG Associates (2017) Economic benefits from onshore wind farms. Available online: https://bvgassociates.com/wp-content/uploads/2017/09/BV-
GA-18510-Economic-impact-onshore-wind-report-r3.pdf
ClimateXChange. 20 minute neighbourhoods in a Scottish context: https://www.climatexchange.org.uk/research/projects/20-minute-neighbour-
hoods-in-a-scottish-context/
Community Action Lanarkshire. Community Action Plans: https://www.communityactionlan.org/get-involved/community-action-plans
East Ayrshire Council (2017). East Ayrshire Council Local Development Plan (LDP). Available online: https://www.east-ayrshire.gov.uk/PlanningAndTh-
eEnvironment/Development-plans/LocalAndStatutoryDevelopmentPlans/East-Ayrshire-Local-Development-Plan-2017.aspx
East Ayrshire Council (2015) Local Development Plan - Background Paper: Sensitive Landscape Areas. Available online: https://www.east-ayrshire.
gov.uk/Resources/PDF/L/LDP-Sensitive-Landscape-Area-Background-Paper.pdf
East Ayrshire Council (2020). East Ayrshire Minerals Local Development Plan. Available online: https://www.east-ayrshire.gov.uk/PlanningAndTheEnvi-
ronment/Development-plans/LocalAndStatutoryDevelopmentPlans/East-Ayrshire-Minerals-Local-Development-Plan.aspx
East Ayrshire Council, Carol Anderson Landscape Associates (2018). East Ayrshire Landscape Wind Capacity Study. Available online: https://www.
east-ayrshire.gov.uk/Resources/PDF/L/Landscape-wind-capacity-study.pdf
East Ayrshire Council (2020). East Ayrshire Minerals Local Development Plan. Available online: https://www.east-ayrshire.gov.uk/PlanningAndTheEnvi-
ronment/Development-plans/LocalAndStatutoryDevelopmentPlans/East-Ayrshire-Minerals-Local-Development-Plan.aspx
East Ayrshire Council (2020). East Ayrshire Recreation Plan 2021-2024. Available online: https://eastayrshireleisure.com/media/2550/recrea-
tion-plan-final.pdf
Glasgow and Clyde Valley (GCV) Green Network Partnership - Blueprint. https://www.gcvgreennetwork.gov.uk/what-we-do/our-blueprint
GCV Green Network Partnership - Clyde Climate Forest Initiative. https://www.gcvgreennetwork.gov.uk/clyde-climate-forest
Glasgow and the Clyde Valley Strategic Development Planning Authority (2017). Clydeplan. Available online: https://www.clydeplan-sdpa.gov.uk/
images/ApprovedPlanHighRes.pdf
NatureScot (2021). Guidance - Assessing the cumulative impact of onshore wind energy developments. Available online: https://www.nature.scot/doc/
guidance-assessing-cumulative-landscape-and-visual-impact-onshore-wind-energy-developments
NatureScot (2020). General pre-application and scoping advice for onshore wind farms. Available online:  https://www.nature.scot/doc/general-pre-ap-
plication-and-scoping-advice-onshore-wind-farms
Net Zero Nation: https://www.netzeronation.scot/
Scottish Government (2020). Securing a green recovery on a path to net zero: climate change plan 2018–2032 - update. Available online: https://www.
gov.scot/publications/securing-green-recovery-path-net-zero-update-climate-change-plan-20182032/documents/
Scottish Government (2014). Scottish Planning Policy (SPP). Available online: https://www.gov.scot/publications/scottish-planning-policy/
Scottish Government (2018). Scotland’s public health priorities. Available online: https://www.gov.scot/publications/scotlands-public-health-priorities/
Scottish Government (2019). Place Principle: introduction. Available online: https://www.gov.scot/publications/place-principle-introduction/
Scottish Government (2019). Scotland to become a net-zero society: https://www.gov.scot/news/scotland-to-become-a-net-zero-society/
Scottish Government (2020). Fourth National Planning Framework: position statement. Available online: https://www.gov.scot/publications/scot-
lands-fourth-national-planning-framework-position-statement/documents/
Scottish Government (2021). A Fairer, Greener Scotland: Programme for Government 2021-22: https://www.gov.scot/publications/fairer-greener-scot-
land-programme-government-2021-22/
Scottish Government (2021). Rural and Environment. Working together to maximise the potential of our land: https://blogs.gov.scot/rural-environ-
ment/2021/02/05/working-together-to-maximise-the-potential-of-our-land/
Scottish Government (2021). Scotland 2045 - fourth National Planning Framework - draft: consultation. Available online: https://www.gov.scot/publica-
tions/scotland-2045-fourth-national-planning-framework-draft/
Scottish Government (2021). Onshore wind – policy statement refresh 2021: consultation draft. Available online: https://www.gov.scot/publications/on-
shore-wind-policy-statement-refresh-2021-consultative-draft/
Scottish Government. National Performance Framework: https://nationalperformance.gov.scot/
Scottish Government. Regional Spatial Strategies. Available online: https://www.transformingplanning.scot/media/1292/rss-factsheet-for-web-final.pdf
Scottish Government. National Outcomes: https://nationalperformance.gov.scot/national-outcomes
Scottish Government. Just Transition Commission: https://www.gov.scot/groups/just-transition-commission/
Scottish Natural Heritage (SNH) (2018). A Handbook on Environmental Impact Assessment, Appendix 2: Landscape and Visual Impact Assessment,
Version 5. Available online: https://www.nature.scot/sites/default/files/2018-05/Publication%202018%20-%20Environmental%20Impact%20Assess-
ment%20Handbook%20V5.pdf
SNH (2017). Visual Representation of Wind Farms, Version 2.2. Available online: https://www.nature.scot/doc/visual-representation-wind-farms-guid-
ance
SNH (2017). Siting and Designing Wind Farms in the Landscape, Version 3. Available online: https://www.nature.scot/doc/siting-and-designing-wind-
farms-landscape-version-3a
SNH (2015). Spatial Planning for Onshore Wind Turbines – natural heritage considerations, Guidance. Available online: https://www.nature.scot/sites/
default/files/2019-10/Guidance%20-%20Spatial%20Planning%20for%20Onshore%20Wind%20Turbines%20-%20natural%20heritage%20considera-
tions%20-%20June%202015.pdf
SNH (2015). Good Practice During Windfarm Construction, Version 3. Available online: https://www.nature.scot/sites/default/files/2018-08/Guid-
ance%20-%20Good%20Practice%20during%20wind%20farm%20construction.pdf
SNH (2015) Constructed Tracks in the Scottish Uplands, 2nd Edition. Available online: https://www.nature.scot/sites/default/files/Publication%20
2015%20-%20Constructed%20tracks%20in%20the%20Scottish%20Uplands.pdf
South Lanarkshire Council, Ironside Farrar (2010). South Lanarkshire Validating Local Landscape Designations. Available online: https://www.southla-
narkshire.gov.uk/downloads/file/4147/landscape_designations_report_november_2010
South Lanarkshire Council, Ironside Farrar (2016). South Lanarkshire Landscape Capacity Study for Wind Energy. Available online: https://www.south-
lanarkshire.gov.uk/downloads/download/868/renewable_energy_supplementary_guidance
South Lanarkshire Council, Ironside Farrar (2019). South Lanarkshire Tall Wind Turbines: Landscape Capacity Siting and Design Guidance. Addendum
to Landscape Capacity Study for Wind Energy 2016. Available online: https://www.southlanarkshire.gov.uk/downloads/file/13239/tall_wind_turbines_
landscape_capacity_siting_and_design_guidance
South Lanarkshire Council (2020). Supporting Planning Guidance Renewable Energy. Available online: https://www.southlanarkshire.gov.uk/down-
loads/file/14641/supporting_planning_guidance_renewable_energy
South Lanarkshire Council (2020). Local Development Plan 2 (LDP2). Available online: https://www.southlanarkshire.gov.uk/info/200145/planning_
and_building_standards/39/development_plans/2
South Lanarkshire Council. Renewable Energy Fund Grants: https://www.southlanarkshire.gov.uk/info/200168/getting_involved_in_your_communi-
ty/744/renewable_energy_fund
United Nations. Sustainable Development Goals (SDGs): https://sdgs.un.org/goals
322

Page 323

Page 53
Wind Energy Developments of the Hagshaw Energy Cluster
Cumberhead Wind Farm (Under construction), website: https://www.bidwells.co.uk/what-we-do/projects/cumberhead-wind-farm/
Cumberhead West Wind Farm (Consented), website: https://3renergy.co.uk/projects/cumberhead-west-wind-farm/
Dalquhandy Wind Farm (Under construction), website: https://www.baywa-re.com/en/news/details/baywa-re-acquires-second-lanarkshire-wind-farm-site
Douglas West Wind Farm (Operational), website: https://3renergy.co.uk/projects/douglas-west-wind-farm/
Douglas West Wind Farm Extension (Consented), website: https://3renergy.co.uk/projects/douglas-west-wind-farm-extension/
Hagshaw Hill Wind Farm (Operational), website: https://www.scottishpowerrenewables.com/pages/hagshaw_hill.aspx
Hagshaw Hill Wind Farm Extension (Operational), website: https://www.scottishpowerrenewables.com/pages/hagshaw_hill.aspx
Hagshaw Hill Wind Farm Repowering (Consented), website: https://3renergy.co.uk/projects/hagshaw-hill-wind-farm/
Hare Craig Wind Farm (Consented), website: https://www.energiekontor.co.uk/our-projects/hare-craig
Galawhistle Wind Farm (Operational), website: https://www.ventientenergy.com/our-portfolio/galawhistle/
Nutberry Wind Farm (Operational), website: https://community.falckrenewables.eu/2016/05/03/nutberry/
323

Page 324

Website: www.thehagshawenergycluster.co.uk
Email:  info@thehagshawenergycluster.co.uk
Twitter: @HEnergyCluster
A Development Framework for the Hagshaw Energy Cluster
Planning for Net Zero
324