Agenda Document Pack - Planning Committee - 03/10/2023

South Lanarkshire Council · 3 October 2023
Back to Planning Committee — 3 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 26 September 2023 
Dear Councillor 
Planning Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 03 October 2023
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Richard Nelson (Chair), Gerry Convery (Depute Chair), Joe Fagan (ex officio), Alex Allison, Ralph
Barker, Archie Buchanan, Ross Clark, Margaret Cowie, Maureen Devlin, Colin Dewar, Gladys
Ferguson-Miller, Elise Frame, Alistair Fulton, Celine Handibode, Mark Horsham, Ross Lambie,
Martin Lennon, Monique McAdams, Lesley McDonald, Davie McLachlan, Norman Rae, John Ross,
Graham Scott, David Shearer, Helen Toner, David Watson 
Substitutes
Walter Brogan, Robert Brown, Mathew Buchanan, Margaret Cooper, Poppy Corbett, Allan Falconer,
Grant Ferguson, Graeme Horne, Martin Hose, Julia Marrs, Ian McAllan, Kenny McCreary, Bert
Thomson
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Planning Committee held on 5 September 2023
submitted for approval as a correct record.  (Copy attached) 
3 - 10 
Item(s) for Decision 
3 Application P/21/2176 for Erection of 4 Detached Houses with Associated
Car Parking and Landscaping at Land at St Isidore's RC Church,
Lindsaylands Road, Biggar
Report dated 22 September 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
11 - 22 
4 Application P/23/0797 for Erection of Outbuilding (Retrospective) at 11
Drumgray Drive, Cambuslang
Report dated 22 September 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
23 - 30 
5 Application P/23/0858 for Installation of 16 Pedestrian Lighting Columns in
Village Green at Coalburn Village Green, Coalburn Road, Coalburn, Lanark
Report dated 22 September 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
31 - 36 
Urgent Business 
6 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Stuart McLeod
Clerk Telephone: 07385 370 117
Clerk Email: stuart.mcleod@southlanarkshire.gov.uk 
2

Page 3

PLANNING COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 5 September 2023 
Chair:
Councillor Richard Nelson 
Councillors Present:
Councillor Alex Allison, Councillor Ralph Barker, Councillor Archie Buchanan, Councillor Ross
Clark, Councillor Gerry Convery (Depute), Councillor Margaret Cowie, Councillor Maureen Devlin,
Councillor Colin Dewar, Councillor Gladys Ferguson-Miller, Councillor Elise Frame, Councillor
Celine Handibode, Councillor Mark Horsham, Councillor Ross Lambie, Councillor Lesley McDonald,
Councillor Davie McLachlan, Councillor Norman Rae, Councillor John Ross, Councillor Graham
Scott, Councillor David Shearer, Councillor Helen Toner, Councillor David Watson 
Councillors' Apologies:
Councillor Joe Fagan (ex officio), Councillor Alistair Fulton, Councillor Martin Lennon, Councillor
Monique McAdams 
Attending:
Community and Enterprise Resources
F Carlin, Head of Planning and Regulatory Services; B Darroch, Planning and Building Standards
Manager (East); F Jack, Team Leader, Development Management Team, Roads and
Transportation Services
Finance and Corporate Resources
M Cannon, Legal Services Adviser; S Jessup, Administration Assistant; S McLeod, Administration
Officer 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Planning Committee held on 8 August 2023 were submitted
for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Application P/19/0097 for Erection of 3 Wind Turbines with a Blade Tip Height of
24.8 Metres and a Hub Height of 18.3 Metres at Land 210 Metres West of O'Cathian
House, Hayhill Road, Thortonhall 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/19/0097 by Jackton Estates Limited for the
erection of 3 wind turbines with a blade tip height of 24.8 metres and a hub height of 18.3
metres at land 210 metres west of O’Cathian House, Hayhill Road, Thorntonhall.
2
3

Page 4

At its meeting on 9 May 2023, the Committee deferred the application to allow the applicant
more time to engage with National Air Traffic Services (NATS) and BAA Glasgow, in terms of
the Radar Mitigation Scheme, on the grounds that jobs and further employment opportunities
were potentially at stake.  However, it was understood that no further consultation had taken
place with NATS or BAA Glasgow and no confirmation had been provided by the applicant of an
agreement being reached in relation to a Radar Mitigation Scheme, therefore, the proposal was
considered to have unresolved aviation safety objections.   
The Committee decided: that planning application P/19/0097 by Jackton Estates
Limited for the erection of 3 wind turbines with a blade tip
height of 24.8 metres and a hub height of 18.3 metres at
land 210 metres west of O’Cathian House, Hayhill Road,
Thorntonhall be refused for the reasons detailed in the
Executive Director’s report. 
[Reference:  Minutes of 9 May 2023 (Paragraph 3)] 
4 Application P/22/0205 for Erection of Residential Development (81 Houses) with
Associated Roads, Parking, Amenity Space and Associated Works at Land 115
Metres South of 122 Goremire Road, Goremire Road, Carluke 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/22/0205 by JR Construction (Scotland)
Limited for the erection of a residential development (81 houses) with associated roads, parking,
amenity space and associated works at land 115 metres south of 122 Goremire Road, Goremire
Road, Carluke. 
There followed a discussion on the report during which an officer responded to a member’s
question on an aspect of the report. 
The Committee decided: that planning application P/22/2025 by JR Construction
(Scotland) Limited for the erection of a residential
development (81 houses) with associated roads, parking,
amenity space and associated works at land 115 metres
south of 122 Goremire Road, Goremire Road, Carluke be
granted subject to the conditions specified in the Executive
Director’s report. 
Councillor McLachlan joined the meeting during consideration of the above item of business 
5 Application P/22/0345 for Change of Use of Farm Steading to Form 2 Houses,
Restoration of Farmhouse to Form 1 House, Erection of 3 Houses and Associated
Access Improvements (Renewal of Planning Consent P/18/0374) at Orchard Farm,
Waygateshaw Road, Carluke 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/22/0345 by Taylor Homes (Scotland)
Limited for a change of use of farm steading to form 2 houses, restoration of farmhouse to form
1 house, erection of 3 houses and associated access improvements (renewal of planning
consent P/18/0374) at Orchard Farm, Waygateshaw Road, Carluke.
4

Page 5

The Committee decided: that planning application P/22/0345 by Taylor Homes
(Scotland) Limited for a change of use of farm steading to
form 2 houses, restoration of farmhouse to form 1 house,
erection of 3 houses and associated access improvements
(renewal of planning consent P/18/0374) at Orchard Farm,
Waygateshaw Road, Carluke be granted subject to the
conditions specified in the Executive Director’s report. 
[Reference:  Minutes of 27 January 2015 (Paragraph 17)] 
Councillor Ross joined the meeting during consideration of the above item of business 
6 Application P/22/1646 for Erection of 7 Wind Turbines with Associated
Infrastructure and Meteorological Mast to 105 Metres - Section 42 Application to
Vary Condition 12 (Operational Lifetime), Condition 23 (Restoration Period) and
Conditions 11, 13, 15, 17 and 19 (Vary Timing of Information Submission) of
Planning Consent P/19/1803 at Priestgill Wind Farm, Little Gill Farm, Abington 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/22/1646 by Priestgill Wind Farm Limited for
the erection of 7 wind turbines with associated infrastructure and meteorological mast to 105
metres, under Section 42 of the Town and Country Planning (Scotland) Act 1997, to vary
condition 12 (operational lifetime), condition 23 (restoration period) and conditions 11, 13, 15, 17
and 19 (vary timing of information submission) of planning consent P/19/1803 at Priestgill Wind
Farm, Little Gill Farm, Abington.  Details were given on the amendments to the conditions
proposed by the applicant. 
At its meeting on 7 July 2015, the Committee had approved a procedure for processing planning
applications which required completion of a Legal Agreement.  If approved, the application
would be subject to a Legal Agreement and/or other appropriate mechanism and the approved
procedure would apply. 
The Committee decided: 
(1) that planning application P/22/1646 by Priestgill Wind Farm Limited for the erection of 7
wind turbines with associated infrastructure and meteorological mast to 105 metres, under
Section 42 of the Town and Country Planning (Scotland) Act 1997, to vary condition 12
(operational lifetime), condition 23 (restoration period) and conditions 11, 13, 15, 17 and 19
(vary timing of information submission) of planning consent P/19/1803 at Priestgill Wind
Farm, Little Gill Farm, Abington be granted subject to:- 
 the conditions specified in the Executive Director’s report
 prior conclusion of a Section 75 Agreement and/or other appropriate agreement
between the Council and the applicant to ensure:-
 community contributions per megawatt generated
 the setting up of a Habitat Management Group
 the repair of roads and bridges arising from extraordinary wear and tear
associated with the development and associated indemnity insurance
requirements
 the applicant meeting the Council’s legal costs associated with the Legal Agreement
and the restoration guarantee quantum
5

Page 6

(2) that it be noted that, in accordance with the agreed procedure, should there be no
significant progress by the applicant towards the conclusion of the Legal Agreement within
6 months of the date of the meeting at which the application was considered, the proposed
development could be refused on the basis that, without the planning control or developer
contribution which could be secured by the Legal Agreement, the proposed development
would be unacceptable; and 
(3) that it be noted that, if the Legal Agreement had not been concluded within the 6 month
period but was progressing satisfactorily, the applicant would be offered the opportunity to
enter into a Processing Agreement, if this was not already in place, which would set an
alternative agreed timescale for the conclusion of the Legal Agreement. 
[Reference: Minutes of 7 July 2015 (Paragraph 15) and 1 December 2020 (Paragraph 9)] 
7 Application P/23/0071 for Refurbishment and Alterations to Former Student
Accommodation to Form 26 Residential Flats with Associated Parking at 2
Barrack Street, Hamilton 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/0071 by C&S Group for the
refurbishment and alterations to former student accommodation to form 26 residential flats with
associated parking at 2 Barrack Street, Hamilton. 
The Committee decided: that planning application P/23/0071 by C&S Group for the
refurbishment and alterations to former student
accommodation to form 26 residential flats with associated
parking at 2 Barrack Street, Hamilton be granted subject to
the conditions specified in the Executive Director’s report. 
8 Application P/23/0301 for Erection of a 1.5 Storey House with Associated Works at
8A Abbeygreen, Lesmahagow 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/0301 by Mr and Mrs B Hood for the
erection of a 1.5 storey house with associated works at 8A Abbeygreen, Lesmahagow. 
The Committee decided: that planning application P/23/0301 by Mr and Mrs B Hood
for the erection of a 1.5 storey house with associated works
at 8A Abbeygreen, Lesmahagow be granted subject to the
conditions specified in the Executive Director’s report. 
9 Application P/23/0308 for Erection of 6 Wind Turbines, Access Tracks and
Ancillary Infrastructure - Section 42 Application to Amend Condition 1 of Planning
Consent P/20/0406 to Extend Time Period to 16 April 2054 and Condition 15 to
Extend Period for Decommissioning to 3 Years at Muirhall Wind Farm,
Auchengray, Lanark 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/0308 by Muirhall Wind Farm Limited for
the erection of 6 wind turbines, access tracks and ancillary infrastructure, under Section 42 of
the Town and Country Planning (Scotland) Act 1997, to amend condition 1 of planning consent
P/20/0406 to extend the time period of consent to 16 April 2054 and condition 15 to extend the
period for decommissioning to 3 years at Muirhall Wind Farm, Auchengray, Lanark.
6

Page 7

The original permission had been subject to a Legal Agreement to ensure that a habitat
management plan was implemented throughout the lifetime of the wind farm and to secure
yearly contributions (£2,500 per megawatt generated) to the South Lanarkshire Renewable
Energy Fund.  The Legal Agreement had been structured in such a way that any permission that
superseded the original permission would also be subject to the provisions of the Legal
Agreement and, therefore, a variation of the Agreement was not required. 
The Committee decided: that planning application P/23/0308 by Muirhall Wind Farm
Limited for the erection of 6 wind turbines, access tracks
and ancillary infrastructure, under section 42 of the Town
and Country Planning (Scotland) Act 1997, to amend
condition 1 of planning consent P/20/0406 to extend the
time period of consent to 16 April 2054 and condition 15 to
extend the period for decommissioning to 3 years at
Muirhall Wind Farm, Auchengray, Lanark be granted
subject to the conditions specified in the Executive
Director’s report. 
[Reference:  Minutes of 25 August 2020 (Paragraph 13)] 
10 Application P/23/0309 for Extension to Existing Muirhall Wind Farm Involving
Erection of Two 145 Metre High Wind Turbines and Associated Infrastructure -
Section 42 Application to Amend Condition 2 of Planning Consent P/20/0409 to
Extend Time Period to 16 April 2054 and Condition 4 to Extend Period for
Decommissioning to 3 Years at Muirhall Wind Farm, Auchengray, Lanark 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/0309 by Muirhall WF Extension Limited
for an extension to existing Muirhall Wind Farm involving erection of two 145 metre high wind
turbines and associated infrastructure, under Section 42 of the Town and Country Planning
(Scotland) Act 1997, to amend condition 2 of planning consent P/20/0409 to extend the time
period of consent to 16 April 2054 and condition 4 to extend the period for decommissioning to 3
years at Muirhall Wind Farm, Auchengray, Lanark. 
The original permission had been subject to a Legal Agreement to ensure that a habitat
management plan was implemented throughout the lifetime of the wind farm and to secure
yearly contributions (£2,500 per megawatt generated) to the South Lanarkshire Renewable
Energy Fund.  The Legal Agreement had been structured in such a way that any permission that
superseded the original permission would also be subject to the provisions of the Legal
Agreement and, therefore, a variation of the Agreement was not required. 
The Committee decided: that planning application P/23/0309 by Muirhall WF
Extension Limited for an extension to existing Muirhall
Wind Farm involving erection of two 145 metre high wind
turbines and associated infrastructure, under Section 42 of
the Town and Country Planning (Scotland) Act 1997, to
amend condition 2 of planning consent P/20/0409 to
extend the time period of consent to 16 April 2054 and
condition 4 to extend the period for decommissioning to 3
years at Muirhall Wind Farm, Auchengray, Lanark be
granted subject to the conditions specified in the Executive
Director’s report. 
[Reference:  Minutes of 25 August 2020 (Paragraph 16)]
7

Page 8

11 Application P/23/0431 for Substitution of House Types and Reduction of Units
Consisting of 55 Detached, Semi-Detached and Terraced Units and 9 Flats,
Including 17 Affordable Housing Units and Associated Road Realignment
(Amendment to Planning Consent P/21/1901) at Former Hoover Site Phase 4, Dale
Avenue, Cambuslang 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/0431 by Dawn Homes Limited for the
substitution of house types and reduction of units consisting of 55 detached, semi-detached and
terraced units and 9 flats, including 17 affordable housing units and associated road realignment
(amendment to planning consent P/21/1901) at former Hoover Site Phase 4, Dale Avenue,
Cambuslang. 
The Committee decided: that planning application P/23/0431 by Dawn Homes
Limited for the substitution of house types and reduction of
units consisting of 55 detached, semi-detached and
terraced units and 9 flats, including 17 affordable housing
units and associated road realignment (amendment to
planning consent P/21/1901) at former Hoover Site Phase
4, Dale Avenue, Cambuslang be granted subject to the
conditions specified in the Executive Director’s report. 
[Reference:  Minutes of 22 November 2022 (Paragraph 4)] 
12 Application P/23/0748 for Erection of 44 Semi-Detached Houses and Associated
Works at Site of Former Cairns Primary School, Cairnswell Avenue, Cambulsang 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/0748 by South Lanarkshire Council for
the erection of 44 semi-detached houses and associated works at site of former Cairns Primary
School, Cairnswell Avenue, Cambuslang. 
The Committee decided: that planning application P/23/0748 by South Lanarkshire
Council for the erection of 44 semi-detached houses and
associated works at site of former Cairns Primary School,
Cairnswell Avenue, Cambuslang be granted subject to the
conditions specified in the Executive Director’s report. 
13 Application P/23/0848 for Erection of House with Associated Access and Parking
(In Part Retrospective) at Land 50 Metres South Southwest of 1 Milton Cottage,
Milton Road, Carluke 
A report dated 28 August 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on planning application P/23/0848 by Mr and Mrs D Cornwell for the
erection of a house with associated access and parking (in part retrospective) at land 50 metres
south southwest of 1 Milton Cottage, Milton Road, Carluke. 
The application had been referred to Committee for consideration, as requested by Councillor
Shearer, in terms of section 2.4 of the Council’s Planning Application Decision Making Process. 
Points raised in further representations to elected members were referred to at the meeting and
addressed by an officer.
8

Page 9

Following discussion, during which an officer responded to members’ questions on aspects of
the report, Councillor Nelson, seconded by Councillor Convery, moved that the application be
refused for the reasons detailed in the Executive Director’s report.  Councillor Shearer,
seconded by Councillor Allison, moved that the application be granted subject to appropriate
conditions, to be prepared by officers, on the grounds that the application site was deemed to be
a brownfield site.  The Legal Services Adviser highlighted that, if the application was granted, it
would result in a determination contrary to the development plan.  On a vote being taken using
the electronic voting system, 7 members voted for the amendment and 14 for the motion which
was declared carried. 
The Committee decided: that planning application P/23/0848 by Mr and Mrs D
Cornwell for the erection of a house with associated access
and parking (in part retrospective) at land 50 metres south
southwest of 1 Milton Cottage, Milton Road, Carluke be
refused for the reasons detailed in the Executive Director’s
report. 
[Reference:  Minutes of 6 June 2023 (Paragraph 7)] 
Councillor Toner joined the meeting during consideration of the above item of business and was,
therefore, unable to participate in the vote 
14 Urgent Business 
There were no items of urgent business. 
9

Page 10

10

Page 11

Report
Agenda Item 
CHECKED
Report to: Planning Committee
Date of Meeting: 3 October 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/21/2176
Proposal:  Erection of 4 no. detached dwellings with associated car parking and
landscaping
Site Address:  Land at St Isidore's RC Church
Lindsaylands Road
Biggar
Applicant:  Trustees of the Diocese of Motherwell 
Agent:  DTA
Ward:  03 Clydesdale East
Application Type:  Full Planning Permission 
Advert Type:  Notification of Neighbours placed in Lanark Gazette dated 12 January
2022
Development Plan
Compliance: 
Yes 
Departures:  Not applicable
Recommendation:  Grant subject to conditions
Legal Agreement:  Not applicable
Direction to
Scottish Ministers 
Not applicable 
3
11

Page 12

1. Reason for Report
1.1. This application is being presented to the Planning Committee for determination as it
has received more than 5 objections, as detailed in paragraph 3.5 (b) of the Decision
Making Process April 2015. 
2. Site Description
2.1. The site is located in the settlement of Biggar and within the curtilage of St Isidore’s
RC Church.  The site is bound to the north by Lindsaylands Road, to the east by an
industrial estate and dwellinghouse, to the south by Coulter Road – the main approach
to Biggar – and to the west by residential development. 
2.2. The site itself contains St Isidore’s RC Church situated to the south of the site with a
single-track vehicular access off Lindsaylands Road on the northern boundary.  The
northern boundary contains a stone wall and the access to the site is tree lined down
to the Church.  The site is sloping with higher land located on the northern boundary
steeply sloping down.  There are also trees on the north, west and southern part of
the site. 
3. Description of Proposed Development
3.1. The proposed development seeks detailed planning permission for 4 detached
dwellinghouses.  One dwellinghouse is positioned facing on to Lindsaylands Road, the
remaining 3 are situated internally within an existing clearing facing towards the
existing access track within the site.  A proposed vehicular access is situated to the
west of the existing access track. 
3.2. The proposed 3-bedroom dwelling to the front of the site consists of 3 levels of
accommodation, addressing the levels on site.  The proposed dwelling would appear
as single storey dwelling with attic accommodation from Lindsaylands Road.  The
other dwellings would consist of 1½ storey dwellings, with 4 bedrooms and a modern
projecting double height bay to the front elevation.  The materials indicated include a
mixture of white render, timber cladding and a grey roof tile. 
3.3. The plans have been updated to ensure the retention of more trees than initially
indicated on site, namely those along the eastern boundary.  There will be some loss
of trees on the northern boundary to accommodate the new site access.  The existing
stone wall is to be removed and rebuilt further back in the site, at a lower height to
accommodate a pedestrian path and visibility. 
3.4. A soakaway design for surface water for each dwellinghouse is proposed and
connections to the public water and sewerage systems are proposed. 
4. Relevant Planning History
4.1. There is no relevant planning history. 
5. Supporting Information 
5.1. The applicant has submitted the following information to support the application:- 
 Tree Survey Report 
 Planning Support Statement 
 Bat Roost Survey 
6. Consultations
6.1. Roads and Development (Flooding) – No objection subject to satisfactory drainage
arrangements being provided as per the appropriate Council guidance.
Response – Noted, this can be achieved through the imposition of conditions. 
12

Page 13

6.2. Roads and Development (Transportation) – No objections, subject to conditions
relating to access, footway, visibility and parking.
Response – Noted. 
6.3. West of Scotland Archaeology Service – Whilst the area around Biggar is rich in
recorded archaeological material, they have no objection subject to conditions
requiring an archaeological watching brief to be undertaken. 
Response – Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of
25 representations have been received (20 objections, 5 comments).  In addition,
results of a survey by Biggar Community Council were submitted including 19
unsupportive, 18 supportive and 4 unsure comments.  The issues raised are
summarised as follows:- 
Principle of Development
 Lack of capacity in school
 Overdevelopment of the site
 Use of prime agricultural land
 Land is not allocated for housing
 Lack of affordable housing 
Road Safety
 Increased traffic
 Gradient of access unsuitable in inclement weather
 Lack of pavement on Lindsaylands Road and parked vehicles already limit
visibility.
 Unsafe pedestrian access
 Lindsaylands Road is part of National Cycle Network and Core Path.  The access
will impact upon the safety of walkers and cyclists
 Lack of clarity on plans in relation to proposed access 
Design and Amenity
 Loss of residential amenity, including privacy
 Visual impact of the development since it is not in keeping with the surrounding
area
 Loss of wall and impact on streetscape
 Increased light pollution
 Noise and disturbance from construction and occupation of the properties 
Trees/Biodiversity/Bats
 Loss of trees
 Impact on bats
 Breaking up an eco-corridor 
Flooding/Sustainable Drainage
 There is an underground stream within the site and a lack of site investigations
 Hard landscaping on site would exacerbate surface water flooding 
Construction Impacts
 Potential use of adjacent children’s grass play area for construction parking and
storage of materials
 Noise impact 
13

Page 14

Support
 More housing is needed
 Site is suitable for residential use 
7.2 The above issues will be considered in the assessment below and full copies are
available to view on the planning portal. 
7.3 Loss of Church
 The proposal would limit access to the church for older and disabled persons
 Loss of a place of worship within Biggar 
 Object to the sale of the Church and development of its lands 
A number of comments were raised about the loss of the Church within Biggar.  The
church itself is not included within the proposed plans for development.  It is
understood that the facility has closed and relocated.  This matter is not planning
related. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 – Tackling the climate and nature crises
 Policy 2 – Climate mitigation and adaption
 Policy 3 – Biodiversity 
 Policy 4 – Natural Places
 Policy 6 – Trees, Forestry and Woodland
 Policy 12 – Zero waste
 Policy 13 – Sustainable Transport
 Policy 14 – Design Quality and Place
 Policy 15 – Local Living and 20 minute neighbourhoods
 Policy 16 – Quality homes
 Policy 19 – Heating and cooling
 Policy 22 – Flood Risk and Water Management
 Policy 21 – Play Recreation and Sport 
8.3. South Lanarkshire Local Development Plan 2 (2021)
The South Lanarkshire Local Development Plan 2 (SLLDP2) was formally adopted on
9 April 2021.  For the purposes of determining planning applications the Council will,
therefore, assess proposals against the policies contained within the adopted
SLLDP2.  In this regard the application site and associated proposals are affected by
the following policies contained in the SLLDP2:- 
14

Page 15

SLLDP2 Volume 1 Policies
 Policy 1 – Spatial Strategy
 Policy 2 – Climate Change
 Policy 3 – General Urban Areas and Settlements
 Policy 5 – Development Management
 Policy 14 – Natural and Historic Environment 
SLLDP2 Volume 2 Policies
 Policy SDCC3 – Sustainable Drainage Systems
 Policy DM1 – Design
 Policy NHE13 – Trees and Woodland
 Policy NHE 9 Protected Species
 Policy DM15 – Water Supply
 Policy DM16 – Foul Drainage/Sewerage Provision
 Policy SDCC 7 – Low and Zero Carbon Emission from New Buildings   
South Lanarkshire Council (SLC) Supporting Planning Guidance
 Residential Design Guide 2011
 Electric Vehicle Charging Point Supporting Guidance 2022 
9. Guidance
9.1. NatureScot Developing with Nature Guidance is relevant to all local developments and
provides advice and guidance on how to achieve Policy 3 Biodiversity of NPF4. 
10. Assessment and Discussion
10.1. Introduction
Detailed planning permission is sought for the erection of 4 dwellinghouses at St
Isidore’s RC Church, Biggar.  The main issues to be addressed in the determination
of this application is the principle of residential development, layout, siting, design and
technical matters.  The policies contained within National Planning Framework 4
(NPF4) and the South Lanarkshire Local Development Plan 2 (SLLDP2) are the main
consideration in this case, listed above, together with an assessment of any other
material planning considerations. 
10.2. Principle of Development
The site is located within the general urban area of Biggar, as defined by Policy 3 of
SLLDP2.  The site is located within close proximity to the town centre of Biggar.  A
variety of facilities are available within 1km or less of the site and include shopping,
health centre, pharmacy, dentists, nursery, primary and secondary school, public
toilets, parks, open space, sports and recreation facilities.  There is also access to bus
connections and various employment opportunities. 
10.3. Policy 3 does not specifically allocate sites for housing, however, the principle of
residential development is acceptable in an urban location.  NPF4 Policy 16 seeks to
encourage, promote and facilitate the delivery of more high quality, affordable and
sustainable homes, in the right locations.  It details that homes on land not allocated
for housing shall only be supported in limited circumstances, as set out in part (f).  This
site of 4 dwellings in the context of Biggar is considered a small-scale opportunity
within an existing settlement boundary satisfying part (iii).  The site is consistent with
local living and 20 minute neighbourhoods (NPF4 Policy 15) satisfying part (ii).  A
timing condition will be applied to any permission granted in line with part (i). 
15

Page 16

10.4. Overall, it is considered that the principle of development is acceptable on this site and
the proposal complies with Policy 15 and 16 of NPF4 and Policy 3 of SLLDP2. 
10.5. Climate Change
NFP4 Policy 1, NPF4 Policy 2 and SLLDP2 Policy 2 aim to ensure that proposals for
new development must, where possible, seek to minimise and mitigate against the
effects of climate change.  SLLDP2 Policy SDCC 7 - Low and Zero Carbon Emission
from New Buildings, also requires a further 10% reduction on emissions beyond that
contained in the Building Regulations.  NPF4 Policy 19 Heating and Cooling requires
that buildings occupied by people (i.e. dwellings) ensure sustainable temperature
management utilising passive methods where possible. 
10.6. The site is well located for services within the existing settlement, where the majority
of the daily needs could be achieved by walking, wheeling or cycling.  The dwellings
themselves shall be required to go through the Scottish Building Standards.  However,
that aside, further conditions shall be imposed to ensure electric car charging at each
dwelling.  A condition requiring further details on including low and zero carbon
technologies shall be imposed on any permission granted.  The site layout has
positioned the main living area to face either south or southeast, to allow for
sustainable temperature management.  In addition, the proposal will have no
significant adverse impact on the water or soil environment, flood risk, air quality,
biodiversity and/or green networks.  Therefore, overall the proposal is considered, on
balance, to meet the terms of NPF4 Policy 1 and Policy 2 and SLLDP2 Policy 2 and
SDCC7. 
10.7. Layout, Siting and Design
NPF4 Policy 14 Design Quality and Place and SLLDP2 Policy 5 Development
Management and Placemaking and Policy DM1 New Development Design seeks to
ensure well designed development that makes for successful places and considers
the impact on residential amenity. 
10.8. The proposal consists of 4 detached dwellinghouses.  One of which is positioned to
the front of the site, facing onto Lindsaylands Road.  This dwelling would appear as a
single storey dwelling with attic accommodation from Lindsaylands Road, although it
has 3 storeys of accommodation due to site levels.  The design includes an eyebrow
dormer and double storey bay window projection, representing a modern interpretation
of the traditional properties adjacent to it.  The plans show the stone wall rebuilt at a
lower height within the site. 
10.9. Within the site the 3 other dwellings consist of 1½ storey dwellings, with 4 bedrooms
and a modern projecting double height bay to the front elevation.  The materials
indicated include a mixture of white render, timber cladding and a grey roof tile.  It is
considered that the proposals are appropriate in terms of scale, siting and design for
the surrounding area. 
10.10. There are existing dwellings adjacent to the site, however, given the set back of the
rear gardens proposed, and retention of trees on the eastern boundary, it is not
considered there is a loss of residential amenity.  Nor is the volume of traffic from 4
dwellings considered to be a significant issue. 
10.11. NPF4 Zero Waste Policy 12 details that suitable bin storage inclusive of recycling bins
shall be shown on site. In addition, NPF4 Policy 21 (d) Play, recreation and sport
details for any dwelling occupied by children and young people shall incorporate well-
designed, good quality provision for play, recreation and relaxation which is
proportionate to the development and existing provision in the area.   
16

Page 17

10.12. There is suitable space at each dwelling for access, parking, bin storage and garden
ground.  Given the location of the site within the centre of Biggar it is considered there
is good quality play provision at parks in the surrounding area.  There are also the
opportunities for informal play within the site. 
10.13. The proposal meets the terms of NPF4 Policies 12, 14 and 21 and SLLDP2 Policies 5
and DM1. 
10.14. Biodiversity, Trees and Protected Species
NPF4 Policy 3 Biodiversity under part (c) details that all local developments shall
include appropriate measures to conserve, restore and enhance biodiversity.  The
Developing with Nature Guidance is pertinent in this case.  The guidance encourages
a mitigation hierarchy to be applied - avoid, minimise, restore and offset to achieve a
net positive biodiversity impact.  NPF4 Policy 4 Natural Places requires that where
proposals are likely to have an impact on a protected species (ie. bats), steps must be
taken to establish its presence and a level of protection then afforded. SLLDP2 Policy
NHE9 Protected Species, carries similar aims. 
10.15. During the handling of the application, plans have been amended to retain further trees
within the site, namely those on the eastern boundary.  This allows for the part
retention of a nature network for protected species within the site.  Furthermore,
compensatory bat boxes would be required.  It is considered that the proposal in this
regard has avoided, minimised and then restored.  A condition requiring a tree
protection plan across the site shall further ensure impact to existing trees is avoided. 
10.16. However, the guidance requires the creation of new habitats, preferably on site.  A
condition would be imposed on any permission granted, requiring the submission of
appropriate biodiversity measures; this should relate to the existing features on site
such as trees and bats.  Therefore, subject to conditions, the proposal meets the terms
of NPF4 Policies 3 and 4 and SLLDP2 Policies 14, NHE9 and NHE13 
10.17. Technical Matters
SLLDP2 Policy SDCC 3 Sustainable Urban Drainage seeks to ensure suitable
sustainable urban drainage.  NPF4 Policy 22 Flood risk and water management details
that proposals shall not increase the risk of surface water to others or themselves. 
Additionally, all rain and surface water should be managed through SUDS and form
part of the proposed/existing, blue/green infrastructure and areas of impermeable
surfaces are to be minimised.  The site is not at risk from river or surface water
flooding.  A soakaway design for surface water is proposed for each dwelling.  A
suitable condition would ensure that a suitable SUDs scheme is implemented.  The
proposal meets the terms of SLLDP2 Policy SDCC3 and NPF4 Policy 22. 
10.18. SLLDP2 Policy DM16 Water Supply and Policy DM16 Foul Drainage seeks to ensure
appropriate water supply and foul drainage arrangements.  The application form
details connections will be made to the existing public water and sewerage system.
Therefore, the proposal meets the terms of Policy DM15 and DM16. 
10.19. A suitable road design and layout are proposed. Roads and Transportation Services
have been consulted and have not raised any safety concerns. 
10.20. Other matters raised by representations include the capacity of the school, loss of
agricultural land and disruption during construction.  There are no issues raised in
terms of education or the loss of agricultural land since the site is located within an
urban area.  Appropriate conditions and advisory notes will be used to minimise any
disruption from the development during the construction phase.  
17

Page 18

10.21. Conclusion 
In conclusion, the proposal seeks planning permission for 4 dwellings.  The site is well
located within the settlement boundary of Biggar and is a suitable location for
residential use.  The proposed layout can be achieved without significant impact on
surrounding amenity and the natural environment and the design complements the
surrounding area.  Overall, it is considered that the proposals comply with the
provisions of the relevant policies within National Planning Framework 4 and the South
Lanarkshire Local Development Plan 2. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Planning Permission Subject to the following Conditions:- 
01. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice. 
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
02. That prior to any works starting on site an energy statement shall be submitted
for the written approval of the Planning Authority.  The development shall then
be completed in accordance with the approved details. 
Reason: To secure the timeous implementation of renewable and/or low carbon
energy technologies.         
03. That prior to any works starting on site details of biodiversity measure(s) shall
be submitted for the written approval of the Planning Authority. The biodiversity
measure(s) shall thereafter be implemented prior to occupation or completion
of the approved dwellings, whichever occurs first. 
Reason: In order to ensure the provision of biodiversity measures which restore
and enhance the site and surrounding area. 
04. That before any dwellinghouse hereby approved is completed or brought into
use, an electric vehicle charging point shall be provided for each dwelling, and
thereafter retained, and be capable of delivering a minimum 7kw charge all in
accordance with the Council's 'Supporting Planning Guidance - Electric Vehicle
Charging Points August 2022'. 
Reason: To ensure timely and continued provision of electric vehicle charging
point. 
05. That before any development commences on site or before any materials are
ordered or brought to the site, details and samples of all materials to be used
as external finishes on the development shall be submitted to and approved by
the Council as Planning Authority. 
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
18

Page 19

06. Prior to the commencement of the development hereby approved (including
any ground clearance, tree works, demolition or construction), details of all tree
protection monitoring in relation to the area marked in green on the approved
plans and site supervision by a suitably qualified tree specialist (where
arboricultural expertise is required) shall be submitted to and approved in
writing by the Council as Planning Authority. The development shall thereafter
be implemented in strict accordance with the approved details. 
Reason: To ensure that the Council as Planning Authority may be satisfied that
the trees to be retained will not be damaged during development works and to
ensure that, as far as is possible, the work is carried out in accordance with the
approved details. 
07. That no development shall commence until details of surface water drainage
arrangements have been submitted to and approved in writing by the Council
as Planning Authority; such drainage arrangements will require to comply with
the principles of sustainable urban drainage systems and with the Council's
Sustainable Drainage Design Criteria and Soakaway Design Guidance -
Technical Appendix May 2023 and shall include signed appendices as required.
The surface water drainage arrangements shall investigate ground conditions
and any potential impact from underground watercourses within the
development site. The development shall not be occupied until the surface
drainage works have been completed in accordance with the details submitted
to and approved by the Council as Planning Authority.   
Reason: To ensure that the disposal of surface water from the site is dealt with
in a safe and sustainable manner, to return it to the natural water cycle with
minimal adverse impact on people and the environment and to alleviate the
potential for on-site and off-site flooding. 
08. That before the development hereby approved is completed or brought into use,
3 no. parking spaces (3m by 6m modules) per dwellinghouse approved shall
be laid out, constructed to the specification of the Council as Roads and
Planning Authority. 
Reason: To ensure the provision of adequate parking facilities within the site. 
09. The developer shall secure the implementation of an archaeological watching
brief, to be carried out by an archaeological organisation acceptable to the
Council as Planning Authority, during all ground disturbance. The retained
archaeological organisation shall be afforded access at all reasonable times
and allowed to record and recover items of interest and finds.  A method
statement for the watching brief will be submitted by the applicant, agreed by
the West of Scotland Archaeology Service and approved by the Council as
Planning Authority prior to commencement of the watching brief.  The name of
the archaeological organisation retained by the developer shall be given to the
Council as Planning Authority and to the West of Scotland Archaeology Service
in writing not less than 14 days before development commences.   
Reason: In order to safeguard any archaeological items of interest or finds. 
10. The Bat Protection Plan as detailed in the Bat Roosts Surveys dated June -
August 2022 shall be carried out. Any change shall be submitted to and
approved in writing by the Council as Planning Authority.  
19

Page 20

Reason: In order to ensure the protection of the specified species.  
11. That prior to the commencement of any works associated with the development
detailed plans showing access and footway and wall facing onto Lindsaylands
Road shall be submitted and approved in writing by the Council as Planning
Authority. These plans shall show an access 5m wide with the first 4m of access
constructed in hardstanding, 2m wide footway in a footway cross over form with
dropped kerb crossing points, drainage gullies and a connection/outfall for
those gullies.  A method of trapping surface water onto the public road shall
also be shown. That no dwellinghouse shall be occupied until the access roads,
footpath and wall facing onto Lindsaylands Road have been constructed in
accordance with the plans approved by this condition. 
Reason: To ensure the provision of satisfactory vehicular and pedestrian
access to the dwellings. 
12. That prior to the commencement of any works associated with the
development, a Construction Traffic Management Plan shall be submitted to
and approved in writing by the Council as Roads and Planning Authority and
implemented thereafter. This document shall include details of access and a
parking provision (including a parking plan) for staff and operatives, intended
working hours, the management and storage of deliveries and the wheel
washing facilities. 
Reason: In order to retain effective planning control. 
13. That before any work commences on site, a woodland management and
maintenance scheme, covering the area coloured blue on the approved plans,
shall be submitted to the Council as Planning Authority for written approval and
it shall include:- 
(a) proposals for the continuing care, maintenance and protection of the trees,
shrubs and hedges including details of the timing and phasing of all such works;
(b) details of the number, variety and size of any replacement trees and shrubs
to be planted and the phasing of such works; and
(c) details of initial and future maintenance. 
Reason: To ensure the protection and maintenance of the existing woodland
within the area. 
14. That before the development hereby approved is completed or brought into use,
a visibility splay of 2.4 metres by 35 metres measured from the road channel
shall be provided on both sides of the vehicular access. 
Reason: In the interests of traffic and public safety. 
12. Reason for Decision
12.1. The application seeks detailed planning permission for 4 detached dwellings and
associated access. The proposal consists of a small scale residential development
well located within a settlement boundary. There is no significant adverse impact on
amenity, public safety or the local environment. The proposal complies with Policies
1, 2, 3, 4, 5, 6, 12, 14, 15, 16, 19, 21, 22 of National Planning Framework 4 (adopted
2023) and Policies 2, 3, 5, 14, SDCC3, DM1, NHE13, NHE9, DM15, DM16 and
SDCC7 of South Lanarkshire Local Development Plan 2 (adopted 2021).  
20

Page 21

David Booth
Executive Director (Community and Enterprise Resources) 
Date: 22 September 2023 
Background Papers
Further information relating to the application can be found online:- 
P/21/2176 | Erection of 4 no. detached dwellings with associated car parking and landscaping | Land
At St Isidore's R.C. Church Lindsaylands Road Biggar (southlanarkshire.gov.uk) 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
21

Page 22

22

Page 23

Report
Agenda Item 
CHECKED
Report to: Planning Committee
Date of Meeting: 3 October 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/23/0797
Proposal:  Erection of outbuilding (retrospective)
Site Address:  11 Drumgray Drive, Cambuslang, G72 8WS
Applicant:  Mr Wali Afzal
Agent:  Stuart Sandilands
Ward:  14 - Cambuslang East
Application Type:  Full Planning Permission
Advert Type:  N/A
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant subject to attached condition
Legal Agreement:  Not required
Direction to
Scottish Ministers 
Not required 
4
23

Page 24

1. Reason for Report
1.1 The application is required to be determined by the Planning Committee under Clause
4.1 of the Decision-Making Process 2015: any application which has attracted more
than five objections. 
2. Site Description
2.1 The application site relates to the curtilage of a detached two-storey dwellinghouse at
11 Drumgray Drive within the designated settlement boundary of Cambuslang.  The
site is located at the head of a cul-de-sac within an established residential area
characterised by similar new-build properties clad with facing brick with residential
dwellings on all sides.  Vehicular and pedestrian access to the property is taken from
Drumgray Drive. 
3. Description of Proposed Development
3.1 The proposal relates to an application for the retrospective consent of the erection of
an outbuilding within the rear garden at 11 Drumgray Drive.  The structure has a width
of 9.9 metres and a depth of 3.4 metres.  Due to a variance in the ground levels, the
apex height of the structure ranges from 2.7 metres to 2.8 metres and the rear
elevation eaves are approximately 2.6 metres in height from ground level.  The
development covers approximately 21% of the rear curtilage.  The roof of the structure
has a slight pitched angle, with the highest point of the roof culminating in overhanging
eaves. 
4. Relevant Planning History
4.1 Prior to the current application, a planning application (P/23/0488) was submitted
which sought both retrospective consent for the existing outbuilding and extension of
the building, thereby forming an L-shaped structure.  The applicant was advised that
this proposal would constitute overdevelopment, so the application was withdrawn,
and a new application submitted which solely related to the existing building. 
5. Supporting Information 
5.1. None 
6. Consultations
6.1. None required. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of
14 representations have been received (6 objections, 8 support).  The issues raised
are summarised as follows:- 
 Amenity impacts
 Overbearing impacts 
 Loss of privacy
 Proposed materials
 Loss of sunlight and daylight to neighbouring gardens
 Noise and disturbance
 Comments confirming that the extension raised no detrimental issues 
The above issues will be considered in the assessment below and full copies are
available to view on the planning portal. 
24

Page 25

7.2 Other non-material planning comments were included in representations. These
points relate to:- 
 Loss of a view
 The structural integrity of proposed materials
 Drainage details
 The use of a temporary marquee within the rear garden
 Ground levelling of the rear curtilage 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  The development plan comprises the
South Lanarkshire Local Development Plan 2 and National Planning Framework 4. 
8.2 National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy. NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
Policy 1: Tackling the climate and nature crises
Policy 2: Climate mitigation and adaption
Policy 16: Quality homes 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2).  In this regard the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
Policy 2: Climate Change
Policy 3: General Urban Areas
Policy 5: Development Management and Placemaking 
SLLDP2 Volume 2 Policies
Policy DM2: House Extensions and Alterations 
South Lanarkshire Council (SLC) Supporting Planning Guidance
Development at a dwellinghouse - SPG 
9. Guidance
9.1. None 
10. Assessment and Discussion
10.1. Introduction
Full planning permission is sought for the erection of an outbuilding at 11 Drumgray
Drive, Cambuslang.  The main issues to be addressed in the determination of this
application includes the acceptability in principle of the proposed development, its
layout, siting and design, and an assessment of technical matters.  The policies
contained within National Planning Framework 4 and the South Lanarkshire Local
Development Plan 2 are the main consideration in this case, together with an
assessment of any other material planning considerations.  
25

Page 26

10.2 Principle of Development
The application site is located within the identified settlement boundary of
Cambuslang.  As such, the proposal is required to be considered against Policy 3 –
General Urban Areas and Settlements of the SLLDP2 which establishes that
residential developments, and those of an ancillary nature, may be considered
acceptable provided that they do not have a significant adverse impact upon the
amenity and character of the area.  It is considered that the principle of an outbuilding
at 11 Drumgray Drive raises no issues within the context of Policy 3 of the SLLDP2. 
10.3 Climate Change
Policy 1 – Tackling the climate and nature crises of NPF4 requires that when
considering all development proposals significant weight will be given to the global
climate and nature crises.  Policy 2 - Climate change and mitigation expands on this,
requiring all new developments to be sited and designed (1) to minimise lifecycle
greenhouse gas emissions as far as possible and (2) to adapt to the current and future
risks from climate change.  Due to its scale and nature, the proposal does not require
a qualitative assessment under NPF4 Policy 2.  The SLLDP2 Policy 2 - Climate
Change sets out criteria which new development should address to minimise and
mitigate against climate change, which is in line with the aims and intentions of NPF4
Policy 2.  The scale of the proposal means that it is more appropriate to assess the
proposals’ climate change impact and mitigation against SLLDP2 Policy 2. 
10.4 The proposal is for an outbuilding.  The Council as Planning Authority recognises its
role in combating the climate crises but given the scale and nature of the proposed
development, it is considered that the impact is acceptable.  The structure has been
built to the applicable insulation requirements in terms of the Building Standard
requirements and the site is located sustainably within a recognised settlement.  The
proposal accords with Policies 1 and 2 of NPF4 and Policy 2 of the SLLDP2. 
10.5 Layout, Siting and Design
Policy 16 – Quality homes of NPF4 aims to encourage, promote and facilitate the
delivery of more high quality, affordable and sustainable homes, in the right locations,
providing choice across tenures that meet the diverse housing needs of people and
communities across Scotland.  Householder development proposals will be supported
where they: do not have a detrimental impact on the character or environmental quality
of the home and the surrounding area in terms of size, design and materials; and do
not have a detrimental effect on the neighbouring properties in terms of physical
impact, overshadowing or overlooking. 
10.6 Policy 5 – Development Management and Placemaking of SLLDP2 states that
development proposals should be well designed and integrate well with the local area. 
Proposals should not have unacceptable significant adverse impacts upon adjacent
buildings or the streetscape in regard to layout, scale, massing, design, external
materials or amenity. 
10.7 Policy DM2 – House Extensions and Alterations of SLLDP2 states that house
extensions and alterations will be considered favourably where it can be demonstrated
that the proposal complies with the following criteria:- 
1) The siting, form, scale, design and materials respect the character of the existing
dwelling and the wider area. Within this context, high quality, innovative design will
be encouraged where it complements the character of the building and its
surroundings.
2) It does not dominate or overwhelm the existing dwelling, neighbouring properties
or streetscene in terms of size, scale or height.  
26

Page 27

3) It does not significantly adversely affect adjacent properties in terms of overlooking
or loss of privacy, daylight or sunlight. 
4) It retains adequate car parking, useable garden ground and bin storage within the
site.
5) It does not have an adverse impact on traffic or public safety. 
10.8 The application site contains a large rear garden area of approximately 160m2 and the
rear boundary treatments consist of fencing.  It is noted that a hard surface has been
constructed covering the entirety of the garden with paving except for a section at the
rear comprising of loose stones.  The proposed outbuilding has a gross external floor
area of approximately 34m2.  While the outbuilding is relatively substantial, the
applicant benefits from a garden of adequate size to accommodate such a structure,
so that no unacceptable overdevelopment occurs.  
10.9 Several representations have been received which express concerns relating to
detrimental impacts of the ancillary building to neighbouring properties regarding the
scale, massing, noise, loss of privacy, overshadowing and amenity impacts of the
structure.  Additionally, several of the representations stated concerns for matters that
were deemed to be non-material to the assessment of this application.  These related
to the loss of a view, the structural integrity of proposed materials, drainage details,
the use of a temporary marquee within the rear garden and the ground levelling of the
rear curtilage.  A number of letters have also been received in support of the proposals. 
10.10 It is noted that some degree of alteration in ground levelling may take place through
the installation of paving or a hard surface, though in this instance the works were not
deemed to constitute a material change and thereby benefited from permitted
development rights under Class 3C of The Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 (as amended 2011). 
10.11 Concerns were also raised relating to the drainage implications resulting from the
structure.  While the capacity of drainage infrastructure for larger applications is a
material consideration, the assessment of drainage details for householder
applications is covered under Building Regulations and will be assessed through a
Building Warrant rather than a planning application. Though it should be noted that the
submitted plans indicate that the outbuilding features rainwater pipes for the purposes
of drainage and loose stones are also located adjacent to the outbuilding which have
a permeable function. Nonetheless, if there are examples of localised flooding the
onus is on the householder to consider and address any private drainage issues. 
10.12 As the openings of the outbuilding are located on its front elevation, it faces the rear
of the applicant’s house and the building does not result in any overlooking to
neighbouring properties to an unacceptable degree. The highest point of the
outbuilding is approximately 2.8 metres, which is 1.2m lower than the maximum height
of a roof that can be erected with permitted development rights within 1 metre of the
boundary of the curtilage. 
10.13 It is considered that the proposal will have no significant adverse impact on the
neighbouring properties, or the surrounding residential area and it complies with the
provisions of Policies 1, 2 and 16 of the adopted National Planning Framework 4 and
Policies 3, 5 and DM2 of the adopted South Lanarkshire Local Development Plan 2
(2021). There are no other additional material considerations which would justify
refusing planning permission. 
10.14 Other issues
None 
27

Page 28

10.15 Technical Matters
None 
11 Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Planning Permission Subject to the following Condition:- 
1. The development to which this permission relates shall be begun no later than the
expiration of three years beginning with the date of grant of this decision notice. 
Reason: To comply with Section 58(1) of the Town and Country Planning (Scotland)
Act 1997 (as amended). 
12 Reason for Decision
12.1 The proposal will not result in a significant adverse impact on either visual or residential
amenity and complies with the provisions of Policies 1, 2, and 16 of the adopted
National Planning Framework 4 and Policies 2, 3, 5, and DM2 of the adopted Local
Development Plan 2. There are no other material considerations which would justify
the refusal of planning permission. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 22 September 2023 
Background Papers
Further information relating to the application can be found online:-
P/23/0797 | Erection of outbuilding (retrospective) | 11 Drumgray Drive Cambuslang G72
8WS 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
28

Page 29

29

Page 30

30

Page 31

Report
Agenda Item 
CHECKED
Report to: Planning Committee
Date of Meeting: 3 October 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/23/0858
Proposal:  Installation of 16 pedestrian lighting columns in village green
Site Address:  Coalburn Village Green, Coalburn Road, Coalburn, Lanark 
Applicant:  Hargreaves Land
Agent:  Ross Alexander Lambie Architects Ltd 
Ward:  04 Clydesdale South
Application Type:  Full Planning Permission 
Advert Type:  Non-notification of neighbours – Lanark Gazette – 23 August 2023
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant subject to attached condition
Legal Agreement:  Not required
Direction to
Scottish Ministers 
Not required 
5
31

Page 32

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
3.3 of the Decision-Making Process 2015: Planning applications from a Member of the
Planning Authority or a close relative will require to be considered by the appropriate
Committee. 
2. Site Description
2.1. The application site relates to an area of open space known as Coalburn Green, a
local recreational park. The site is approximately 9,500 square metres in area and
contains a network of linked pedestrian pathways, park bench seating and a variety of
mature and semi mature trees of varying species.  The site is accessed from Coalburn
Road and Shoulder Rigg Road, contains a small watercourse along the eastern
boundary of the site and is surrounded on all sides by residential dwellings.  
3. Description of Proposed Development
3.1. The proposal involves the installation of 16 pedestrian lighting columns which would
be positioned adjacent to the pathways at approximately 25 metre intervals. The
columns would measure 5 metres in height and contain LED lamps. The layout has
been designed by South Lanarkshire Council Lighting Engineers and the lamps would
be fitted with a timer switching the lighting off automatically at 10pm. 
4. Relevant Planning History
4.1. None. 
5. Supporting Information 
5.1. Planning statement – this outlines the details and aims of the proposal. 
6. Consultations
6.1. Environmental Services – No objection to the proposal. Requested inclusion of advice
notes relating to construction noise, formal action if nuisance occurs and
contamination caution.
Response: Noted. 
6.2 Roads Development Management Team – No objections. Advised that the design for
the proposal was completed by the Council’s Street Lighting Service. 
Response: Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, no valid
representations have been received. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. The development plan comprises the
South Lanarkshire Local Development Plan 2 and National Planning Framework 4. 
8.2 National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland. It sets out spatial principles, regional priorities, national developments, and
national planning policy. NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places.  
32

Page 33

National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises
 Policy 2 - Climate mitigation and adaptation
 Policy 14 - Design, quality and place
 Policy 15 - Local Living and 20 minute neighbourhoods
 Policy 21 - Play, recreation and sport 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2). In this regard, the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 2 - Climate Change
 Policy 3 - General Urban Areas and Settlements
 Policy 5 - Development Management and Placemaking 
SLLDP2 Volume 2 Policies
None 
South Lanarkshire Council (SLC) Supporting Planning Guidance
None 
9. Guidance
9.1. None 
10. Assessment and Discussion
10.1. Full planning permission is sought for the installation of 16 pedestrian lighting columns
at Coalburn Village Green, Coalburn.  The main issues to be addressed in the
determination of this application includes the acceptability in principle of the proposed
development, its layout, siting and design, and an assessment of technical matters. 
The policies contained within National Planning Framework 4 and the South
Lanarkshire Local Development Plan 2 are the main consideration in this case,
together with an assessment of any other material planning considerations. 
10.2. Principle of Development
The application site is located within the settlement boundary of Coalburn. NPF4
Policy 15 – Local Living and 20 Minute Neighbourhoods supports development
proposals that will contribute to local living by providing access to playgrounds, parks,
green streets and spaces. NPF4 Policy 21 - Play, recreation and sport, supports
development proposals which will improve physical and mental health through the
provision of, and access to, outdoor recreation, play and sport facilities. SLLDP2 Policy
3 General Urban Areas and Settlements states that developments which would be
detrimental to the amenity of residents and the wider community or to the character of
the surrounding area will not be permitted. This policy advises that particular
consideration will be given to likely impacts on locally important greenspace. 
10.3. In this instance, the site is located within the settlement boundary and the current use
as open/recreational space would not be altered. The proposal aims to increase the
accessibility, usability and safety of the recreational space, particularly during times of
low light levels in the winter months. Given that the function and use of the recreational
ground would be extended, the proposal is considered to contribute to local living
principles. In addition, the amenity and character of the local area would not be
significantly altered as there would be no reduction to the local greenspace. 
33

Page 34

As such, the proposal is considered to accord with NPF4 Policies 15 and 21 and Policy
3 of the SLLDP2. 
10.4. Climate Change
NPF4 Policy 1 - Tackling the Climate and Nature Crises and NPF4 Policy 2 - Climate
Mitigation and Adaptation together aim to ensure that proposals for new development
must, where possible, seek to minimise and mitigate against the effects of climate
change. In addition, SLLDP2 Policy 2 - Climate Change states that proposals for new
development must, where possible, seek to minimise and mitigate against the effects
of climate change. The proposal would allow for the extended use of the village green
for local residents reducing the need to travel for accessible recreational facilities. The
lighting will use energy efficient LED lighting and has been designed to the required
British Standards.  As such, the proposal is considered to comply with the provisions
of Policies 1 and 2 of NPF4 and Policy 2 of the SLLDP2. 
10.5. Layout, Siting and Design
Policy 14 - Design, quality and place supports development proposals where they are
consistent with the six qualities of successful places – Healthy, Pleasant, Connected,
Distinctive, Sustainable and Adaptable. Development proposals will be supported
where they improve physical and mental health, provide attractive natural and built
spaces and support the efficient use of resources that will allow people to live, play,
work and stay in their area. SLLDP2 Policy 5 Development Management and
Placemaking advises that development proposals will not be supported where they
have a significant adverse impact on nearby residential properties, public safety or
access for all. 
10.6. The proposed lighting columns would allow for the extended use of the recreational
ground when the facility would not normally be accessible in the winter months.  This
would provide a local facility for physical activity which would be beneficial to the
mental and physical wellbeing of local residents.  The lighting has been designed to
minimise the impact on the surrounding residential properties and would be fitted with
a timer which would switch off the lighting at 10pm.  It is therefore considered that the
proposal is consistent with the six qualities of successful places, would not have a
significant detrimental impact on residential amenity, is accessible to all and, as such,
complies with Policy 14 of NPF4 and Policy 5 of the SLLDP.   
10.7. Other issues
None 
10.8. Technical Matters
Roads and Transportation Services advised that the proposal is designed to meet the
British Standards for such installations and offered no objection to the proposal. 
Furthermore, the Planning Statement advises that the works will be carried out and
maintained by South Lanarkshire Council. 
10.9. Environmental Services offered no objection to the proposal.  Given the small-scale
and urban location within the settlement boundary the proposal is not considered to
give rise to any adverse environmental impact.  As such, the proposal is considered
to satisfy technical matters. 
34

Page 35

11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Full Planning Permission subject to the following condition:- 
01. The development to which this permission relates shall be begun no later than the
expiration of three years beginning with the date of grant of this decision notice. 
Reason: To comply with Section 58(1) of the Town and Country Planning (Scotland)
Act 1997 (as amended). 
12. Reason for Decision
12.1. That the proposed lighting would not have a significant detrimental impact on local
amenity and complies with Policies 1, 2, 14, 15 and 21 of NPF4 and Policies 2, 3 and
5 of the SLLDP2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 22 September 2023 
Background Papers
Further information relating to the application can be found online:- 
P/23/0858 | Installation of 16 pedestrian lighting columns in village green. | Coalburn Village Green
Coalburn Road Coalburn Lanark South Lanarkshire 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
35

Page 36

36