Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 28 August 2023 
Dear Councillor 
Planning Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 05 September 2023
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Richard Nelson (Chair), Gerry Convery (Depute Chair), Joe Fagan (ex officio), Alex Allison, Ralph
Barker, Archie Buchanan, Ross Clark, Margaret Cowie, Maureen Devlin, Colin Dewar, Gladys
Ferguson-Miller, Elise Frame, Alistair Fulton, Celine Handibode, Mark Horsham, Ross Lambie,
Martin Lennon, Monique McAdams, Lesley McDonald, Davie McLachlan, Norman Rae, John Ross,
Graham Scott, David Shearer, Helen Toner, David Watson 
Substitutes
Walter Brogan, Robert Brown, Mathew Buchanan, Margaret Cooper, Poppy Corbett, Allan Falconer,
Grant Ferguson, Graeme Horne, Martin Hose, Julia Marrs, Ian McAllan, Kenny McCreary, Bert
Thomson
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Planning Committee held on 8 August 2023
submitted for approval as a correct record.  (Copy attached) 
5 - 16 
Item(s) for Decision 
3 Application P/19/0097 for Erection of 3 Wind Turbines With a Blade Tip
Height of 24.8 Metres and a Hub Height of 18.3 Metres at Land 210 Metres
West of O'Cathian House, Hayhill Road, Thortonhall
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
17 - 24 
4 Application P/22/0205 for Erection of Residential Development (81 Houses)
with Associated Roads, Parking, Amenity Space and Associated Works at
Land 115 Metres South of 122 Goremire Road, Goremire Road, Carluke
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
25 - 40 
5 Application P/22/0345 for Change of Use of Farm Steading to Form 2
Houses, Restoration of Farmhouse to Form 1 House, Erection of 3 Houses
and Associated Access Improvements (Renewal of Planning Consent
P/18/0374) at Orchard Farm, Waygateshaw Road, Carluke
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
41 - 62 
6 Application P/22/1646 for Erection of 7 Wind Turbines with Associated
Infrastructure and Meteorological Mast to 105 Metres - Section 42
Application to Vary Condition 12 (Operational Lifetime), Condition 23
(Restoration Period) and Conditions 11, 13, 15, 17 and 19 (Vary Timing of
Information Submission) of Planning Consent P/19/1803 at Priestgill Wind
Farm, Little Gill Farm, Abington
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
63 - 82 
7 Application P/23/0071 for Refurbishment and Alterations to Former
Student Accommodation to Form 26 Residential Flats with Associated
Parking at 2 Barrack Street, Hamilton
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
83 - 90 
8 Application P/23/0301 for Erection of a 1.5 Storey House with Associated
Works at 8A Abbeygreen, Lesmahagow
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
91 - 100 
9 Application P/23/0308 for Erection of 6 Wind Turbines, Access Tracks and
Ancillary Infastructure (Section 42 Application to Amend Condition 1 of
Planning Consent P/20/0406 to Extend Time Period to 16 April 2054 and
Condition 15 to Extend Period for Decommissioning to 3 Years) at Muirhall
Wind Farm, Auchengray, Lanark
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
101 - 112
2

Page 3

10  Application P/23/0309 for Extension to Existing Muirhall Wind Farm
Involving Erection of 2 145 Metre High Wind Turbines and Associated
Infrastructure (Section 42 Application to Amend Condition 2 of Planning
Consent P/20/0409 to Extend Time Period to 16 April 2054 and Condition 4
to Extend Period for Decommissioning to 3 Years) at Muirhall Wind Farm,
Auchengray, Lanark
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
113 - 122 
11  Application P/23/0431 for Substitution of House Types and Reduction of
Units Consisting of 55 Detached, Semi-Detached and Terraced Units and 9
Flats, Including 17 Affordable Housing Units and Associated Road
Realignment (Amendment to Planning Consent P/21/1901) at Former
Hoover Site Phase 4, Dale Avenue, Cambuslang
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
123 - 136 
12  Application P/23/0748 for Erection of 44 Semi-Detached Houses and
Associated Works at Site of Former Cairns Primary School, Cairnswell
Avenue, Cambulsang
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
137 - 148 
13  Application P/23/0848 for Erection of House with Associated Access and
Parking (In Part Retrospective) at Land 50 Metres South Southwest of 1
Milton Cottage, Milton Road, Carluke
Report dated 28 August 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
149 - 158 
Urgent Business 
14  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Stuart McLeod
Clerk Telephone: 07385 370 117
Clerk Email: stuart.mcleod@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

PLANNING COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 8 August 2023 
Chair:
Councillor Richard Nelson 
Councillors Present:
Councillor Alex Allison, Councillor Ralph Barker, Councillor Walter Brogan (substitute for Councillor
Davie McLachlan), Councillor Archie Buchanan, Councillor Ross Clark, Councillor Margaret Cowie,
Councillor Maureen Devlin, Councillor Mary Donnelly, Councillor Gladys Ferguson-Miller, Councillor
Elise Frame, Councillor Alistair Fulton, Councillor Celine Handibode, Councillor Mark Horsham,
Councillor Ross Lambie, Councillor Lesley McDonald, Councillor Norman Rae, Councillor John
Ross, Councillor Graham Scott, Councillor David Shearer, Councillor Bert Thomson (substitute for
Councillor Gerry Convery), Councillor Helen Toner, Councillor David Watson 
Councillors' Apologies:
Councillor Gerry Convery (Depute), Councillor Joe Fagan (ex officio), Councillor Martin Lennon,
Councillor Monique McAdams, Councillor Davie McLachlan 
Attending:
Community and Enterprise Resources
F Carlin, Head of Planning and Regulatory Services; B Darroch, Planning and Building Standards
Manager (East); F Jack, Team Leader, Development Management Team, Roads and
Transportation Services; S Laird, Engineering Manager (Transportation Engineering); T Meikle,
Planning and Building Standards Manager (West); J Weir, Planning Team Leader (West Team); J
Wright, Planning Team Leader (Headquarters)
Finance and Corporate Resources
M Cannon, Legal Services Adviser; S Jessup, Administration Assistant; S McLeod, Administration
Officer 
1 Declaration of Interests 
The following interests were declared:- 
Councillor(s)
Horsham 
Item(s)
Application P/22/0390 for Change of Use
of Land from Agriculture to Class 6
(Storage or Distribution), Installation of
Modular Office Building, Erection of
Vehicle Washing Bay and Creation of
Hardstanding Area (Retrospective) and
Formation of Haul Road at Townhead
Farm, Ponfeigh Road, Sandilands,
Lanark 
Nature of Interest(s)
Prior involvement in the
application
Nelson Application P/22/1359 for Change of Use
of Domestic Office and Gym to a One-
Bedroom Self-Catering Holiday Let
(Retrospective) at 3 Mauldslie Castle
Orchard, Mauldslie Road, Carluke
Known to an objector
2
5

Page 6

Fulton Application P/22/0357 for Planning
Permission in Principle for the Erection
of 25 Chalets, a Commercial Facility,
Tourist/Leisure Use, Eco Village and
Associated Landscaping (Section 42
Application to Remove Condition 2 –
Number of Units of Planning Consent
P/17/0199) at Land 160 Metres
Northeast of Nether Kypeside Farm,
Lesmahagow 
Employer involved in
previous related
applications
Shearer Application P/23/0596 for Erection of
Detached House on Agricultural Land
(Planning Permission in Principle) at
Stockwell Farm, Braidwood Road,
Braidwood, Carluke
Prior discussion with the
applicant and requested to
address the Committee as a
local member 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Planning Committee held on 6 June 2023 were submitted for
approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 South Lanarkshire Local Development Plan 3, South Lanarkshire Development
Plan Scheme 2023 and Open Space Strategy 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted:- 
♦ requesting approval of the commencement of the relevant statutory processes and
engagement in relation to the preparation of South Lanarkshire Local Development Plan 3
(SLLDP3)
♦ updating the Committee on the work that had been carried out on an Open Space Strategy
for the Council’s area
♦ requesting approval of the South Lanarkshire Development Plan Scheme 2023 
The Planning (Scotland) Act 2019 had introduced a number of changes to the development
planning system including giving the Scottish Government’s National Planning Framework an
enhanced status as part of the development plan alongside the Council’s local development
plan.  The 2019 Act also included a revised framework for local development plan preparation
and a new statutory duty for councils to prepare an Open Space Strategy.  There was no longer
a requirement for councils to prepare Strategic Development Plans. 
The process for preparing SLLDP3 was set out in the Act, with further detail provided in the
subsequent Regulations and guidance published in May 2023.  Details of the process for the
preparation of SLLDP3, which would cover a 10 year period as opposed to the previous 5 year
period, and its format were provided in the report. 
As detailed in the report, the local development plan process now comprised the following
stages:-
6

Page 7

 development plan scheme
 evidence report
 gate check
 proposed plan
 examination
 adoption 
The preparation of an annual Development Plan Scheme (DPS) was a statutory duty and the
draft South Lanarkshire Development Plan Scheme 2023 was attached as Appendix 1 to the
report.  The DPS set out the proposed timetable for each stage of the local development plan
preparation and also included a Participation Statement which outlined how interested parties
could engage in the preparation.  The Participation Statement had been subject to consultation,
via an on-line survey, and had been reviewed to take account of the responses. 
The Open Space Strategy (OSS) would set out the strategic framework of the Council’s policies
and proposals for the development, maintenance and use of green infrastructure and bring
together the policies of services including Planning, Estates, Grounds, Countryside and
Greenspace, and Roads and Transportation.  Guidance on the preparation of local development
plans made reference to the OSS having to be submitted as part of the evidence report and the
requirement to achieve the following 6 outcomes:- 
 improving access to green infrastructure, open space and green networks
 creating successful and sustainable places
 improving health and wellbeing
 advancing equality and eliminating discrimination
 securing positive effects for biodiversity
 mitigation of and adaptation to climate change 
An audit of the Council’s open spaces had been completed earlier this year and work had
commenced on identifying localities at an appropriate scale for which statements describing the
existing quality, quantity and accessibility of open space would be prepared.  This would inform
the assessment of current and future requirements in terms of the 6 outcomes and the needs of
each locality.  Engagement with local communities, including children and young people, older
people, disabled people and key agencies would be carried out.  This work would also align with
the requirement to prepare a separate Play Sufficiency Assessment as part of the local
development plan process. 
Update reports on the preparation of SLLDP3 would be submitted to future meetings of this
Committee as appropriate. 
There followed a discussion during which an officer responded to a member’s question on an
aspect of the report. 
The Committee decided: 
(1) that officers be authorised to commence the relevant statutory processes and engagement
in relation to the preparation of South Lanarkshire Local Development Plan 3; 
(2) that it be noted that work had started on the preparation of an Open Space Strategy for the
Council’s area in the context of the process for preparing a local development plan; and 
(3) that the South Lanarkshire Development Plan Scheme 2023, attached as Appendix 1 to
the report, be approved. 
[Reference:  Minutes of 21 June 2022 (Paragraph 9) and 21 March 2023 (Paragraph 3)]
7

Page 8

4 Application P/21/2155 for Change of Use of Agricultural Farmland to Form an
Agricultural Vehicle, Plant and Machinery Sale Yard Including the Erection of 2
Agricultural Sheds and Associated Works (Retrospective) at Stoneside of Dripps
Farm, Cartside Highway, Thorntonhall 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/21/2155 by Carnbroe Estates Limited for the change of
use of agricultural farmland to form an agricultural vehicle, plant and machinery sale yard
including the erection of 2 agricultural sheds and associated works (retrospective) at Stoneside
of Dripps Farm, Cartside Highway, Thorntonhall. 
There followed a discussion on the application during which an officer responded to members’
questions on aspects of the report. 
The Committee decided: that planning application P/21/2155 by Carnbroe Estates
Limited for the change of use of agricultural farmland to
form an agricultural vehicle, plant and machinery sale yard
including the erection of 2 agricultural sheds and
associated works (retrospective) at Stoneside of Dripps
Farm, Cartside Highway, Thorntonhall be refused for the
reasons detailed in the Executive Director’s report. 
Councillor Toner left and rejoined the meeting during this item of business due to technical
difficulties 
5 Application P/22/0078 for Erection of House with Associated Works at Land
Adjacent to Holmpark, Stoneymeadow Road, East Kilbride 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/22/0078 by E Pringle for the erection of a house with
associated works at land adjacent to Holmpark, Stoneymeadow Road, East Kilbride. 
The application had been referred to Committee for consideration, as requested by Councillor
Scott, in terms of section 2.4 of the Council’s Planning Application Decision Making Process. 
Points raised in further representations to elected members were referred to at the meeting and
addressed by an officer. 
The application had been assessed against the relevant policies and criteria contained in the
National Planning Framework 4 (NPF4) and adopted South Lanarkshire Local Development
Plan 2 (SLLDP2).  Details of the assessment were provided in the report.  In the view of the
Executive Director (Community and Enterprise Resources), while there was compliance with
some aspects of the development plan, the application site was located in the green belt and
there was no specific locational requirement for the dwelling to be located in the green belt,
therefore, the application was deemed to be contrary to Policies 8, 14, 15 and 16 of NPF4 and
Policies 4 and GBRA1 of SLLDP2. 
Following discussion, during which an officer responded to members’ questions on aspects of
the report, Councillor Nelson, seconded by Councillor Devlin, moved that the application be
refused for the reasons detailed in the Executive Director’s report.  Councillor Scott, seconded
by Councillor Shearer, moved that the application be granted subject to appropriate conditions,
to be prepared by officers, on the grounds that the application site was deemed to be a
brownfield site.  The Legal Services Adviser highlighted that, if the application was granted, it
would result in a determination contrary to the development plan.  On a vote being taken using
the electronic voting system, 10 members voted for the motion and 12 for the amendment which
was declared carried.
8

Page 9

The Committee decided: that planning application P/22/0078 by E Pringle for the
erection of a house with associated works at land adjacent
to Holmpark, Stoneymeadow Road, East Kilbride be
granted subject to the conditions attached as Appendix 1 to
this minute. 
6 Application P/22/0122 for Erection of Detached Double Garage at Plot 4, Stanmore
Park, St Leonard Street, Lanark 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/22/0122 by A and A Reid for the erection of a detached
double garage at Plot 4, Stanmore Park, St Leonard Street, Lanark. 
The Committee decided: that planning application P/22/0122 by A and A Reid for the
erection of a detached double garage at Plot 4, Stanmore
Park, St Leonard Street, Lanark be granted subject to the
conditions specified in the Executive Director’s report. 
7 Application P/22/0390 for Change of Use of Land from Agriculture to Class 6
(Storage or Distribution), Installation of Modular Office Building, Erection of
Vehicle Washing Bay and Creation of Hardstanding Area (Retrospective) and
Formation of Haul Road at Townhead Farm, Ponfeigh Road, Sandilands, Lanark 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/22/0390 by JHP Transport Lanark Limited for a change
of use of land from agriculture to Class 6 (storage or distribution), installation of modular office
building, erection of vehicle washing bay and creation of hardstanding area (retrospective) and
formation of haul road at Townhead Farm, Ponfeigh Road, Sandilands, Lanark. 
Members of the Committee thanked officers and the applicant for their efforts in overcoming the
difficulties related to the application. 
The Committee decided: that planning application P/22/0390 by JHP Transport
Lanark Limited for a change of use of land from agriculture
to Class 6 (storage or distribution), installation of modular
office building, erection of vehicle washing bay and
creation of hardstanding area (retrospective) and formation
of haul road at Townhead Farm, Ponfeigh Road,
Sandilands, Lanark be granted subject to the conditions
specified in the Executive Director’s report. 
[Reference:  Minutes of 22 September 2020 (Paragraph 3)] 
Councillor Horsham, having declared an interest in the above application, withdrew from the
meeting during its consideration
9

Page 10

8 Application P/22/0878 for Erection of 14 Wind Turbines (12 with 149.9 Metres
Maximum Height to Tip and 2 with 180 Metres Maximum Height to Tip) with a
Maximum Output of up to 50 Megawatts and Associated Infrastructure Including
Substation, Control Building etc (Section 42 Application to Amend Condition 3 of
Planning Consent P/18/1540 to Permit Operational Lifetime for a 30 Year Period) at
Cumberhead Windfarm, Stockbriggs from New Trows C13 to Cumberhead,
Lesmahagow 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/22/0878 by Cumberhead Wind Energy Limited for the
erection of 14 wind turbines (12 with 149.9 metres maximum height to tip and 2 with 180 metres
maximum height to tip) with a maximum output of up to 50 megawatts and associated
infrastructure including substation, control building etc (Section 42 application to amend
condition 3 of planning consent P/18/1540 to permit an operational lifetime for a 30 year period)
at Cumberhead Windfarm, Stockbriggs from New Trows C13 to Cumberhead, Lesmahagow. 
The Committee decided: that planning application P/22/0878 by Cumberhead Wind
Energy Limited for the erection of 14 wind turbines (12 with
149.9 metres maximum height to tip and 2 with 180 metres
maximum height to tip) with a maximum output of up to 50
megawatts and associated infrastructure including
substation, control building etc (Section 42 application to
amend condition 3 of planning consent P/18/1540 to permit
an operational lifetime for a 30 year period) at Cumberhead
Windfarm, Stockbriggs from New Trows C13 to
Cumberhead, Lesmahagow be granted subject to the
conditions detailed in the Executive Director’s report. 
[Reference:  Minutes of 25 August 2020 (Paragraph 11)] 
9 Application P/22/1359 for Change of Use of Domestic Office and Gym to a 1-
Bedroom Self-Catering Holiday Let (Retrospective) at 3 Mauldslie Castle Orchard,
Mauldslie Road, Carluke 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/22/1359 by A Loudon for a change of use of a
domestic office and gym to a 1-bedroom self-catering holiday let (retrospective) at 3 Mauldslie
Castle Orchard, Mauldslie Road, Carluke. 
The Committee decided: that planning application P/22/1359 by A Loudon for a
change of use of a domestic office and gym to a 1-
bedroom self-catering holiday let (retrospective) at 3
Mauldslie Castle Orchard, Mauldslie Road, Carluke be
granted subject to the conditions specified in the Executive
Director’s report. 
[Reference:  Minutes of 19 November 2013 (Paragraph 8)] 
Councillor Nelson, having declared an interest in the above application, withdrew from the meeting
during its consideration.  Councillor Devlin, in the absence of the Chair and Depute Chair, took the
Chair for this item only
10

Page 11

10 Application P/23/0069 for Installation of Battery Storage Facility (Section 36
Scottish Government Consultation) at Land at Broken Cross Open Cast Coal Site,
Tower Road, Douglas, Lanark 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/23/0069 by Alcemi Storage Developments 6 Limited for
the installation of a battery storage facility (Section 36 Scottish Government Consultation) at
Land at Broken Cross Open Cast Coal Site, Tower Road, Douglas, Lanark. 
The proposal had been submitted to the Scottish Government under Section 36 of the Electricity
Act 1989 as it had an electricity generating capacity of over 50 megawatts (MW).  As a result,
the Council was a consultee to the application and not the consenting authority. 
The application was considered acceptable on the basis that it accorded with the relevant
policies in the National Planning Framework 4 and adopted South Lanarkshire Local
Development Plan 2. 
There followed a discussion on the application during which an officer responded to a member’s
question on an aspect of the report. 
The Committee decided: 
(1) that the Scottish Government be advised that the Council had no objections to planning
application P/23/0069 by Alcemi Storage Developments 6 Limited for the installation of a
battery storage facility (consultation from Scottish Ministers under Section 36 of the
Electricity Act 1989) at land at Broken Cross Open Cast Coal Site, Tower Road, Douglas,
Lanark, subject to the conditions specified in the Executive Director’s report; 
(2) that the Head of Planning and Regulatory Services be authorised to undertake any
discussions in relation to further agreements on the proposed conditions, if required, with
the Scottish Government; and 
(3) that, in addition, the Scottish Government be advised that approval should be subject to
the conclusion of legal agreements covering:- 
 the provision of a temporary overbridge solution for the passage of all abnormal
loads requiring to cross the B7078 Poniel Bridge
 the repair of any damage to roads and bridges arising from extraordinary wear and
tear associated with the construction of the development 
[Reference:  Minutes of 7 July 2015 (Paragraph 15) and 25 August 2020 (Paragraph 12)] 
11 Application P/23/0357 for Planning Permission in Principle for the Erection of 25
Chalets, a Commercial Facility, Tourist/Leisure Use, Eco Village and Associated
Landscaping (Section 42 Application to Remove Condition 2 - Number of Units of
Planning Consent CL/17/0199) at Land 160 Metres Northeast of Nether Kypeside
Farm, Lesmahagow 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/23/0357 by NKS Renewables Company Limited for
planning permission in principle for the erection of 25 chalets, a commercial facility,
tourist/leisure use, eco village and associated landscaping (Section 42 application to remove
condition 2 – number of units of planning consent CL/17/0199) at land 160 metres northeast of
Nether Kypeside Farm, Lesmahagow.
11

Page 12

Points raised in further representations to elected members were referred to at the meeting and
addressed by an officer. 
There followed a discussion on the application during which an officer responded to members’
questions on aspects of the report and application, including a request by the applicant for
consideration of the application to be deferred. 
The Committee decided: that planning application P/23/0357 by NKS Renewables
Company Limited for planning permission in principle for
the erection of 25 chalets, a commercial facility,
tourist/leisure use, eco village and associated landscaping
(Section 42 application to remove condition 2 – number of
units of planning consent CL/17/0199) at land 160 metres
northeast of Nether Kypeside Farm, Lesmahagow be
refused for the reasons detailed in the Executive Director’s
report. 
[Reference:  Minutes of 26 June 2018 (Paragraph 15)] 
Councillor Fulton, having declared an interest in the above application, withdrew from the meeting
during its consideration 
12 Application P/23/0587 for Overcladding of Roof and Walls, Erection of Single
Storey Extension, Nursery Playground Extension and Associated Fencing,
Creation of New Car Park, Widening of Existing Road, Formation of New
Pedestrian Footpath, Stair and Ramp, Substation and Associated Infrastructure at
Our Lady of Lourdes Primary School, Carnegie Hill, East Kilbride 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/23/0587 by South Lanarkshire Council for the
overcladding of roof and walls, erection of single storey extension, nursery playground extension
and associated fencing, creation of new car park, widening of existing road, formation of new
pedestrian footpath, stair and ramp, substation and associated infrastructure at Our Lady of
Lourdes Primary School, Carnegie Hill, East Kilbride. 
The Committee decided: that planning application P/23/0587 by South Lanarkshire
Council for the overcladding of roof and walls, erection of
single storey extension, nursery playground extension and
associated fencing, creation of new car park, widening of
existing road, formation of new pedestrian footpath, stair
and ramp, substation and associated infrastructure at Our
Lady of Lourdes Primary School, Carnegie Hill, East
Kilbride be granted subject to the conditions specified in
the Executive Director’s report. 
13 Application P/23/0596 for Erection of Detached House on Agricultural Land
(Planning Permission in Principle) at Stockwell Farm, Braidwood Road,
Braidwood, Carluke 
A report dated 31 July 2023 by the Executive Director (Community and Enterprise Resources)
was submitted on planning application P/23/0596 by Mr and Mrs C Smith for the erection of a
detached house on agricultural land (planning permission in principle) at Stockwell Farm,
Braidwood Road, Braidwood, Carluke.
12

Page 13

The application had been referred to Committee for consideration, as requested by Councillor
Shearer, in terms of section 2.4 of the Council’s Planning Application Decision Making Process. 
The Committee heard Councillor Shearer, a local member, in support of the application. 
There followed a discussion on the application during which an officer responded to members’
questions on aspects of the report. 
The Committee decided: that planning application P/23/0596 by Mr and Mrs C Smith
for the erection of a detached house on agricultural land
(planning permission in principle) at Stockwell Farm,
Braidwood Road, Braidwood, Carluke be refused for the
reasons detailed in the Executive Director’s report. 
Councillor Shearer, having declared an interest in the above application, withdrew to the public
gallery until invited to make representations to the Committee as a local member.  He returned to
the public gallery during consideration of the application 
14 Urgent Business 
There were no items of urgent business. 
Chair’s Closing Remarks
The Chair referred to the revised report format and advised that it was intended to include links in
future reports to enable members to look at photographs and street views of the application sites. 
13

Page 14

Application P/22/0078 - Conditions and Reasons               Appendix 1 
Application P/22/0078 for Erection of House with Associated Works at Land Adjacent to Holmpark,
Stoneymeadow Road, East Kilbride 
1. The development to which this permission relates shall be begun no later than the expiration
of three years beginning with the date of grant of this decision notice. 
Reason: To comply with Section 58(1) of the Town and Country Planning (Scotland) Act 1997
(as amended). 
2. That before any development commences on site or before any materials are ordered or
brought to the site, details and samples of all materials to be used as external finishes on the
development shall be submitted to and approved by the Council as Planning Authority. 
Reason:  To ensure the development is satisfactory in appearance and to maintain the visual
quality of the area. 
3. That before any work commences on the site, a scheme of landscaping shall be submitted to
the Council as Planning Authority for written approval and it shall include:- 
(a) an indication of all existing trees and hedgerows plus details of those to be retained and
measures for their protection in the course of development
(b) details and specification of all trees, shrubs, grass mix, etc, including, where appropriate,
the planting of fruit/apple trees
(c) details of any top-soiling or other treatment to the ground
(d) sections and other necessary details of any mounding, earthworks and hard landscaping
(e) proposals for the initial and future maintenance of the landscaped areas
(f) details of the phasing of these works; and no work shall be undertaken on the site until
approval has been given to these details 
Reason:  To ensure the appropriate provision of landscaping within the site. 
4. That the approved landscaping scheme shall be completed to the satisfaction of the Council
as Planning Authority during the first available planting season following occupation of the
building(s) or completion of the development hereby approved, whichever is the sooner, and
shall thereafter be maintained and replaced where necessary to the satisfaction of the Council. 
Reason:  In the interests of the visual amenity of the area. 
5. That before development starts, full details of the design and location of all fences and walls,
including any retaining walls to be erected on the site shall be submitted to and approved by
the Council as Planning Authority and thereafter all approved works shall be completed to the
satisfaction of the Council prior to the development hereby approved being occupied or
brought into use. 
Reason:  To ensure the development is satisfactory in appearance and to maintain the visual
quality of the area. 
6. That no trees within the application site shall be lopped, topped, pollarded or felled, or
otherwise affected, without the prior written consent of the Council as Planning Authority. 
Reason:  In the interests of amenity and to ensure the protection and maintenance of the
existing trees within the site.
14

Page 15

7. That all trees to be retained within the site shall be fully protected during the period of
construction and prior to any work commencing on the site.  Written details specifying the
nature of such measures shall be submitted to and approved by the Council as Planning
Authority.  Existing trees to be retained must be protected in accordance with methods as set
out in BS5837/2012 during and until completion of all site operations and building works. 
Reason:  To ensure that adequate steps are taken to protect existing trees on the site
throughout the period of the proposed building operations. 
8. Prior to commencement of the development hereby approved, details of measures to facilitate
the provision of full fibre broadband to serve the development, including details of appropriate
digital infrastructure and a timescale for implementation, shall be submitted to and approved in
writing by the Council as Planning Authority, unless otherwise agreed in writing with the
applicant.  The approved measures shall thereafter be carried out in accordance with the
agreed implementation timescale. 
Reason:  To ensure the provision of digital infrastructure to serve the development. 
9. That no development shall commence until details of surface water drainage arrangements
have been submitted to and approved in writing by the Council as Planning Authority; such
drainage arrangements will require to comply with the principles of sustainable urban drainage
systems and with the Council's Sustainable Drainage Design Criteria and shall include signed
appendices as required.  The development shall not be occupied until the surface drainage
works have been completed in accordance with the details submitted to and approved by the
Council as Planning Authority. 
Reason:  To ensure that the disposal of surface water from the site is dealt with in a safe and
sustainable manner, to return it to the natural water cycle with minimal adverse impact on
people and the environment and to alleviate the potential for on-site and off-site flooding. 
10. That before the development hereby approved is completed or brought into use, a turning
space shall be provided within the site to enable vehicles to enter and leave the application
site in forward gears at all times. 
Reason:  In the interests of traffic and public safety. 
11. That before the development hereby approved is completed or brought into use, the first 4
metres of the driveway, measured from the edge of the carriageway, shall be hard surfaced
across its full width to prevent deleterious material being carried onto the road. 
Reason:  To prevent deleterious material being carried onto the road. 
12. That before the dwellinghouse hereby permitted is occupied, 3no. car parking spaces shall be
provided within the curtilage of the plot and outwith the public road or footway and shall
thereafter be maintained to the specification of the Council as Planning Authority. 
Reason:  To ensure the provision of adequate parking facilities within the site. 
13. That before the development hereby approved is completed or brought into use, a visibility
splay of 2.5 metres by 120 metres measured from the road channel shall be provided on both
sides of the vehicular access and everything exceeding 0.9 metres in height above the road
channel level shall be removed from the sight line areas and thereafter nothing exceeding 0.9
metres in height shall be planted, placed or erected within these sight lines. 
Reason:  In the interests of traffic and public safety.
15

Page 16

14. That prior to any works associated with the construction of the development commencing, a
Construction Traffic Management Plan shall be submitted to the Council as Roads and
Planning Authority for approval.  This shall include:- 
1. A programme for starting on site
2. Details of wheel washing / road cleaning regime to ensure mud and debris is not
deposited on the public road
3. A plan showing that all vehicles should be able to access and exit the site in forward
gears, therefore a turning area must be provided
4. A plan showing the turning area and location and number of spaces for site staff /
operatives 
Reason:  In the interests of traffic and public safety. 
15. Prior to works commencing on site, details of slope protection along the length of the visibility
splays shall be provided for approval and thereafter implemented to the satisfaction of the
Council as Roads and Planning Authority.   
Reason:  These details have not been submitted or approved. 
16. The scheme shall ensure that:- 
a) The internal levels with windows open (or under exceptional circumstances closed) do
not exceed an LAeq, 16hr of 40dB daytime (07:00 - 23:00) 
b) The internal levels with windows open (or under exceptional circumstances closed) do
not exceed an LAeq, 8hr of 30dB night-time (23:00 - 07:00)
c) The internal levels with windows open (or under exceptional circumstances closed) do
not exceed an LAeq, max of 45dB night-time (23:00 - 07:00)
d) The external levels shall not exceed an LAeq, 16hr of 50dB daytime in any rear garden
areas, when measured free-field 
Details of any mitigation (glazing specification/close-board fencing) to demonstrate compliance
with the above shall be submitted to the Council as Planning Authority for approval prior to
habitation. 
Reason:  To minimise noise disturbance. 
17. That before any works commence on site, a bat survey of the outbuilding being demolished
shall be carried out by a qualified ecologist, the findings of which shall be submitted to and
approved in writing by the Council as Planning Authority.  Thereafter any recommendations of
the survey shall be implemented throughout the construction process. 
Reason:  To ensure that any species are protected and suitable mitigation measures are put in
place. 
18. That, unless otherwise agreed in writing with the Council as Planning Authority, provision shall
be made for at least one electrical charging point within the development for motor vehicles. 
Prior to any works commencing on site, details of the proposed arrangements shall be
submitted and agreed in writing with the Council as Planning Authority.  Thereafter the
scheme shall be implemented and maintained to the satisfaction of the Council as Planning
Authority. 
Reason:  To ensure the provision of appropriate facilities on site. 
16

Page 17

Report
Agenda Item 
CHECKED
Report to: Planning Committee
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/19/0097
Proposal:  Erection of 3 no. wind turbines with a blade tip height of 24.8m and a
hub height of 18.3m
Site Address:  Land 210m West of O’Cathian House
Hayhill Road
Thorntonhall
South Lanarkshire
Applicant:  Jackton Estates Limited 
Agent:  Ica Architects Ltd
Ward:  09 East Kilbride West
Application Type:  Full Planning Permission
Advert Type:  Non-notification of neighbours: East Kilbride News 26 February 2019 
Development Plan
Compliance: 
No 
Departures:  N/A
Recommendation:  Refuse
Legal Agreement:  N/A
Direction to
Scottish Ministers 
N/A 
3
17

Page 18

1. Reason for Report
1.1. Members will recall that a decision on this application was deferred by Committee at
the meeting on 9 May 2023 to allow the applicant more time to engage with the
National Air Traffic Service and BAA Glasgow Airport. 
2. Site Description
2.1. The application site is located on land to the west of O’Cathian House, Hayhill Road,
Thorntonhall.  The proposed turbines are located in an area of arable land and
livestock pasture, and further new residential properties are being developed to the
south. 
3. Description of Proposed Development
3.1 Planning permission is sought for the erection of 3 no. wind turbines with a blade tip
height of 24.8m and a hub height of 18.3m.  The turbines would be twin blade lattice
towers and linked by underground cabling to the distillery and the wider grid network.   
3.2 The turbines would have a life of 25 years and the power would be used on site for
the distillery with any excess exported to the grid.  The site will be accessed via the
existing distillery commercial access delivery road to the west of the distillery. 
4. Relevant Planning History
4.1. Prior to the current planning application, a previous planning application (Reference
EK/10/0354) for the erection of a single wind turbine of 24.8m in height was withdrawn
following an unresolved objection by BAA Glasgow Airport on the grounds of air safety
as it conflicts with safeguarding criteria. 
5. Supporting Information 
5.1. The applicant submitted a number of documents in support of the current application
which included a Visual Impact and Development Document, Turbine Installation
Manual, Preliminary Ecology Report and a Delivery Information Document. 
6. Consultations
6.1 BAA Glasgow – objects to the proposed turbine development as the development has
been examined from an aerodrome safeguarding perspective and the proposal
conflicts with safeguarding criteria.  It was noted that the proposed development may
benefit from an approved mitigation technology (Terma).  This could allow the
objection to be removed, but is subject to:- 
⧫ specific technical and operational evaluation by Glasgow Airport
⧫ formal agreement between Glasgow Airport and the applicant 
Response: The applicant initiated a process of obtaining a commercial agreement with
Glasgow Airport in respect of a Radar Mitigation Scheme.  No confirmation has been
provided by the applicant of an agreement in respect of a Radar Mitigation Scheme
having been concluded and it is understood that no engagement has taken place with
BAA Glasgow since the application was last reported to the Committee on 9 May 2023. 
This is despite written requests to the applicant/agent from the Planning Service. 
6.2 Environmental Services – requested further information including a site and turbine
specific Noise Impact Assessment and cumulative noise assessment.  This
information had not been requested as there are unresolved air safety objections.
Response: Noted.   
18

Page 19

6.3 Historic Environment Scotland – no comments in respect of the proposed
development.
Response – Noted. 
6.4 Ministry of Defence (MoD) (Wind Farms) – no objections subject to a condition in
respect of notification in writing to the MoD at least 14 days prior to commencement
of works.
Response: Noted.  Should planning permission be approved, appropriate conditions
can be attached. 
6.5 National Air Traffic Systems Ltd (NATS) – object on the grounds of aviation safety in
regard the turbines impacting upon the aviation PSR RADAR system at Glasgow and
en-route Prestwick air traffic control (ATC).
Response: Noted.  It is understood that no engagement has taken place with NATS
since the application was last reported to the Committee on 9 May 2023, following
requests to the applicant/agent from the Planning Service. 
6.6 Nature Scot – no comments in respect of the proposed development.
Response – Noted. 
6.7 Prestwick Airport (Windfarms and Metmasts) – no objections to the proposed
development as the development is terrain shielded from Prestwick Airport primary
radar, and thus does not pose an aviation safety concern to Prestwick Airport
operational airspace.
Response: Noted. 
6.8 Roads and Transportation Services (Development Management) – raised no
objections to the proposed development subject to conditions in respect of turbine
delivery vehicle access and turning areas.
Response: Noted.  Should planning permission be approved appropriate conditions
could be attached to any decision issued. 
6.9 RSPB Scotland – no response to date. 
6.10 Scottish Water – no objections to the proposed development.
Response – Noted 
6.11 SEPA – provided standing advice in respect of the proposed development.
Response – Noted. 
6.12 TRANSCO – no comments in respect of the proposed development.
Response – Noted. 
6.13 West of Scotland Archaeology Service – no objections to the proposed development.
Response – Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of 2
representations have been received (1 objection, 1 comment) as defined in the
scheme of delegation.  The issues raised are summarised as follows:- 
⧫ visual impact
⧫ habitat and wildlife protection  
19

Page 20

The above issues will be considered in the assessment below and full copies are
available on the planning portal. 
8. Development Plan
8.1. Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the Development Plan unless
material considerations indicate otherwise.  In this case, the Development Plan
comprises the approved National Planning Framework 4 2023 (NPF4) and the
adopted South Lanarkshire Local Development Plan 2 2021 (SLLDP2). 
8.2 National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 Tackling the Climate and Nature Crises
 Policy 2 Climate Mitigation and Adaptation
 Policy 8 Green Belts
 Policy 11 Energy
 Policy 23 Health and Safety 
8.3. South Lanarkshire Local Development Plan 2(2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 1 Spatial Strategy
 Policy 2 Climate Change
 Policy 4 Green Belt and Rural Area
 Policy 5 Development Management and Placemaking
 Policy 18 Renewable Energy 
SLLDP2 Volume 2 Policies
 Policy 1 Spatial Strategy
 Policy 2 Climate Change
 Policy 4 Green Belt and Rural Area
 Policy 5 Development Management and Placemaking
 Policy 18 Renewable Energy
 Policy DM1 New Development Design
 Policy GBRA2 Business Proposals within Green Belt and Rural Area
 Policy RE1 Renewable Energy 
South Lanarkshire Council (SLC) Supporting Planning Guidance
In addition, the Council has prepared Supporting Planning Guidance on Renewable
Energy which provides further detailed advice and requirements for renewable energy
developments.  
20

Page 21

9. Guidance
9.1. None 
10. Assessment and Discussion
10.1 Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the Development Plan unless
material considerations indicate otherwise.  In this case, the Development Plan
comprises the approved National Planning Framework 4 2023 (NPF4) and the
adopted South Lanarkshire Local Development Plan 2 2021 (SLLDP2). 
10.2 Policies 18 and RE1 require renewable energy proposals to be assessed against the
checklist and other relevant policies of SLLDP2.  Following a detailed assessment of
the proposed turbine development the key issues are set out below. 
10.3 As noted earlier, there is an objection from National Air Traffic Systems Limited (NATS)
in relation to the proposals having a detrimental impact upon the aviation PSR RADAR
system at Glasgow and en-route Prestwick ATC and, therefore, aviation safety.  In
addition, Glasgow Airport objected to the proposed development having examined the
proposal from an aerodrome safeguarding perspective as the proposal conflicts with
safeguarding criteria.   
10.4 It was noted that the proposed development may benefit from an approved mitigation
technology (Terma).  This could allow the objection to be removed, however, this
would be subject to a specific technical and operational evaluation by Glasgow Airport
and a formal agreement between Glasgow Airport and the applicant. 
10.5 The applicant initiated a process of obtaining a commercial agreement with Glasgow
Airport in respect of a Radar Mitigation Scheme.  No confirmation has been provided
by the applicant of an agreement in respect of a Radar Mitigation Scheme having been
concluded.  Given the outstanding objection from NATs and Glasgow Airport and there
being no confirmation that a Radar Mitigation Scheme has been concluded, the
proposal is considered to have unresolved air safety impacts.  Following on from
Planning Committee of 9 May 2023, no information has been submitted to suggest
that the applicant has engaged with either NATS or BAA Glasgow. 
10.6 A Visual Impact and Development Document was submitted as part of the application. 
This consisted of six photomontages, however, no Landscape and Visual Impact
Assessment report or Zone of Theoretical Visibility map have been provided. 
10.7  In terms of Landscape Impact the application site is located on the edge of Plateau
Farmland and the Urban Fringe Farmland Character Type (LCT), as defined in the
South Lanarkshire Landscape Character Assessment 2010 (LCA).  Given the medium
scale of the turbine in the landscape, I am satisfied that the proposed turbines would
not have a significant, detrimental impact upon the landscape character of these
Landscape Character Types. 
10.8 In terms of general visual impact, it is considered that the height of the turbines, at
24.8m to blade tip, and their location would result in visual impact occurring across the
surrounding area.  It is considered that the visual impact of the proposed turbines is
significantly detrimental to the closest residential properties and that the turbines would
be prominent in views from the A726 Glasgow Southern Orbital Road and from the
southern edge of East Kilbride including the new residential developments north of
Hayhill Road and Eaglesham Road and Thorntonhall.  
21

Page 22

10.9 Impacts on communities and individual dwellings, including visual impact, residential
amenity, noise and shadow flicker
The impact of the proposed development on communities and individual dwellings
requires to be assessed.  It is noted that a Residential Visual Amenity Study (RVAS)
has not been carried out. 
10.10 The Visual Impact and Development Document does, however, demonstrate that
significant visual effects are predicted from the turbines at Viewpoints (VP) 2, 3, 4, 5
and 6 where the turbine would be prominent in views from residential areas of East
Kilbride and Thorntonhall and would have a significantly detrimental effect on the
residential visual amenity of the closest residential properties, recent developments to
the south of Eaglesham Road and consented properties under construction to the
south of Hayhill Road. 
10.11 A noise assessment or shadow flicker assessment have not been submitted. 
Environmental Services requested further information including a site and turbine
specific Noise Impact Assessment and cumulative noise assessment.  This
information had not been requested as there are unresolved air safety objections. 
10.12 In conclusion, NPF4 supports renewable energy development in the right places
provided the impacts of the proposed development can be mitigated.  A full
assessment of the proposals against the Development Plan has been carried out
above.  South Lanarkshire Council continues to support meeting renewable energy
targets and has a suite of development plan and strategic documents to ensure the
Council area continues to promote suitable renewable development.
10.13 However, in this instance, following the above assessment, it is considered that, due
to the outstanding objections from NATs, Glasgow Airport and no confirmation having
been provided by the applicant of an agreement in respect of a Radar Mitigation
Scheme having been concluded, the proposal is considered to have unresolved air
safety impacts as well as the proposed turbines having an unacceptable visual impact,
therefore, on balance, the proposals do not comply with policy. 
10.14 The detrimental impact of the proposal outweighs the renewable energy gain and
therefore it is recommended that planning permission be refused. 
11. Recommendation and reasons for refusal.
11.1 The Committee is asked to agree the following recommendation:- 
Refuse planning permission for the reasons outlined below:- 
01. The proposal would have an adverse impact on aviation safety and appropriate
mitigation has not been proposed to address this matter.  As a result, the
proposals are contrary to Policy 11 of the National Planning Framework 4 (2023). 
02. The proposal would result in an unacceptable impact on the visual amenity of the
area.  As such, the proposal is contrary to Policy 11 of the National Planning
Framework 4 (2023). 
03. The proposal would have an adverse impact on aviation safety and appropriate
mitigation has not been proposed to address this matter.  As a result, the
proposals are contrary to Policy 18 of the adopted South Lanarkshire Local
Development Plan 2 (2021).  
22

Page 23

04. The proposal would have an adverse impact on aviation safety and appropriate
mitigation has not been proposed to address this matter.  As such, the proposal
is contrary to Policy RE1 and Criteria 15 the Assessment Checklist for Renewable
Energy of the adopted South Lanarkshire Local Development Plan 2 (2021) and
South Lanarkshire Local Development Plan 2 Supporting Planning Guidance
Renewable Energy 2021. 
05. The proposal would result in an unacceptable impact on the visual amenity of the
area.  As such, the proposal is contrary to Policy 18 of the South Lanarkshire
Local Development Plan 2 (2021). 
06. The proposal would result in an unacceptable impact on the visual amenity of the
area.  As such, the proposal is contrary to Policy RE1 and Criteria 3 the
Assessment Checklist for Renewable Energy of the adopted South Lanarkshire
Local Plan 2 (2021) and South Lanarkshire Local Development Plan 2 Supporting
Planning Guidance for Renewable Energy 2021. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 28 August 2023 
Background Papers
Further information relating to the application can be found online: 
P/19/0097 | Erection of 3 no. wind turbines with a blade tip height of 24.8m and a hub
height of 18.3m. | Land 210M West Of Ocathian House Hayhill Road Thorntonhall
Glasgow South Lanarkshire 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications. Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
23

Page 24

24

Page 25

Report
Agenda Item 
CHECKED
Report to: Planning Committee
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/22/0205
Proposal:  Erection of residential development (81 dwellings) with associated
roads, parking, amenity space and associated works
Site Address:  Land 115m south of 122 Goremire Road
Goremire Road
Carluke
Applicant:  JR Construction (Scotland) Ltd
Agent:  Iceni Projects
Ward:  01 Clydesdale West
Application Type:  Full Planning Permission
Advert Type:  Non-notification of neighbours and Development Contrary to the
Development Plan: Lanark Gazette 02 March 2022
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant Subject to Conditions
Legal Agreement:  None required
Direction to
Scottish Ministers 
No 
4
25

Page 26

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
5.1 of the Decision-Making Process 2015:  The Planning Committee deals with all
national and major planning applications as set out in the planning legislation,
including detailed planning applications for housing proposals comprising 50 or more
units. 
2. Site Description
2.1. The application site extends to 3.77 hectares and is located to the south of Carluke
and fronts onto Goremire Road.  To the east is a residential development, to the west,
the site bounds onto greenspace and agricultural land, and to the south there is a
SUDS pond serving the adjacent residential development, along with greenspace and
agricultural land. 
2.2. The majority of the site is located within the settlement boundary of Carluke, with a
small peripheral area extending into designated Greenbelt. 
3. Description of Proposed Development
3.1. Planning permission is sought for 81 homes comprising 49 two bedroom terraced
houses, 19 three bedroom terraced houses, 12 two bedroom flats and one three
bedroom end terrace bungalow.  The development would be owned and managed by
Link Housing Association.   
3.2. There will be footpath links to Old Lanark Road along the western boundary whilst
another path will connect through to the adjacent residential area to the east.  Parking
spaces will be finished in porous paviours to facilitate surface water drainage which
will be carried in pipes to be treated by a filter tank trench and attenuation tank, before
draining into the existing surface sewer along Goremire Road. 
4. Relevant Planning History
4.1. A Proposal of Application Notice CL/15/X0173/NEW for a residential development was
issued in February 2015 with no further consultation required.  The Planning
Committee approved the recommendation to grant permission for Planning
Application CL/17/0325 for residential development (Planning Permission in Principle)
in September 2019 subject to the conclusion of a section 75 agreement to secure
financial contributions towards affordable housing, education and community facilities. 
To date the conclusion of the section 75 agreement remains outstanding. 
4.2. A Proposal of Application Notice P/21/006/PAN for a residential development
(Community Growth Area) including affordable housing was submitted in February
2022 along with appropriate local consultation, prior to the submission of the current
application. 
5. Supporting Information 
5.1. The following information was submitted by the agent in support of the application:- 
 Design and Access Statement 
 Drainage Impact Assessment 
 Extended Phase 1 Habitat Survey
 Pre-application Consultation Report Ground Investigation Report
 Shadow Analysis
 Assessment of Landscape Proposals
 Transport Assessment (Updated July 2023)
 Arboriculture Report  
26

Page 27

6. Consultations
6.1. Environmental Services – no objections, subject to conditions and advisory notes in
respect of construction noise, pest control, piling, dust mitigation, nuisance, and
contamination remediation strategy and implementation. 
Response - Noted. 
6.2. Roads Flood Risk Management – no objection subject to the attachment of conditions
in respect of Flood Risk Assessment, sustainable drainage design details and
completion of SUDs appendices. 
Response - Noted. 
6.3. Roads and Transportation Services – no objection to the proposal subject to conditions
since adequate access and parking are proposed.  The proposed conditions relate to
access, parking and submission of a construction management plan.
Response – Noted. 
6.4. The Coal Authority - records indicate that the site is underlain by former mine workings,
however, none relate to the extraction of coal.  Accordingly, in this instance, it is
beyond the remit of the Coal Authority to have any responsibility for considering these
features.  The Coal Authority therefore has no comments to make on the proposal.
Response - A comprehensive and detailed Ground Investigation Report has been
submitted with recommendations for addressing land stability, removing toxic
elements, and safeguarding the public from potential contact with contaminants and
gas emissions.  If permission is granted, conditions will be attached requiring the
approval and implementation of a remediation strategy. 
6.5. Scottish Water - there is sufficient capacity in Camps Water Treatment Works and
Maudslie Waste Water Treatment works for a foul only connection.  Scottish Water
indicate that the development may impact upon a trunk mains in the proximity of the
development.  The developer should contact Scottish Water at the earliest opportunity
with strong evidence to support the intended drainage plan prior to making a
connection request. 
Response - Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement for non
notification of neighbours and Development Contrary to the Local Plan in the local
press, a total of 12 objections and one representation have been received.  The issues
raised are summarised as follows:-   
Objections:- 
Amenity
⧫ Impact upon privacy
⧫ Terraced housing out of keeping with detached housing along Goremire Road
⧫ Loss of open space
⧫ Overshadowing/loss of light
⧫ Design and layout of development including the additional roads and parking
provision 
Land Use Concerns 
⧫ The proposed site lies outwith the 20 minute neighbourhood of Carluke town
centre  
27

Page 28

Impact on Natural and Historic Environment
⧫ Destroys habitat including trees and does not enhance green network
⧫ Contrary to biodiversity aims
⧫ Impact upon wild birds and mammals 
Roads Related Matters
⧫ Impact upon road safety as a result of additional traffic
⧫ Pedestrian access routes are not safe and inclusive
⧫ Lack of footway over the full length of the Goremire Road frontage 
Other Matters Raised
⧫ Impact upon school capacity
⧫ NHS is already overstretched
⧫ Mineshafts have not been identified
⧫ Ground being excavated may result in flooding/standing water if the
development is at a different height 
7.2. Other non-material planning comments were included in representations.  These points
relate to:- 
⧫ Disruption during construction
⧫ Too many houses being built in a short space of time 
7.3. The above issues are considered in the assessment below.  These letters are
available for inspection on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is the national spatial strategy for Scotland.  It
sets out spatial principles, regional priorities, national developments, and national
planning policy.  NPF4 supports the planning and delivery of sustainable places,
liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the Climate and Nature Crises 
 Policy 2 - Climate Mitigation and Adaptation 
 Policy 3 - Biodiversity
 Policy 8 - Green Belts 
 Policy 9 - Brownfield, vacant and derelict land
 Policy 14 - Design, quality, and place
 Policy 15 - Local Living and 20 minute neighbourhoods
 Policy 16 - Quality Homes 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
The South Lanarkshire Local Development Plan 2 (SLLDP2) was formally adopted on
9 April 2021.  For the purposes of determining planning applications the Council will,
therefore, assess proposals against the policies contained within the adopted
SLLDP2. 
28

Page 29

8.4. In this regard the application site and associated proposals are affected by the
following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 1 - Spatial Strategy 
 Policy 2 - Climate Change
 Policy 3 - General Urban Areas and Settlements
 Policy 4 - Green Belt and Rural Area 
 Policy 5 - Development Management and Placemaking
 Policy 11 - Housing
 Policy 13 - Green Network and Greenspace 
SLLDP2 Volume 2 Policies
 Policy DM1 - New Development Design 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Introduction 
The determining issues in the consideration of this application are its compliance with
the National Planning Framework 4 (NPF4) and adopted South Lanarkshire Local
Development Plan 2 (SLLDP2). 
10.2. Principle of Development 
The majority of the site falls within the settlement boundary of Carluke and forms part
of the Carluke Community Growth Area.  However, a small area in the northwest
corner of the application site is located within the designated green belt but will remain
undeveloped. 
10.3. This will provide a strong landscape buffer along the eastern edge, whilst Goremire
Road and existing dwellings to the north will provide the necessary defensible
boundary.  Therefore, the proposal complies with Policies NPF4 8 – Green Belts and
SDLLP2 4 – Green Belt and Rural Area. 
10.4. Policy 1 Spatial Strategy of SDLLP2 encourages sustainable economic growth and
regeneration, a move to a low carbon economy, protection of the natural and historic
environment and mitigation against the impact of climate change.  To achieve this the
spatial strategy will direct larger developments to sustainable urban locations such as
Carluke and Lanark, support the development of the Community Growth Areas and
redevelopment of appropriate brownfield sites.  Appendix 3 lists the Community
Growth Areas which includes Carluke and sets down specific requirements to be
addressed for the development of the identified site.  This includes the definition of
new landscape measures to consolidate new Green Belt edges and establish green
networks within the development.  There is also a requirement for the provision of
housing types which accord with local development plan (LDP) policies including
affordable housing. 
10.5. The application site is identified as a Community Growth Area within the settlement
boundary of Carluke in the LDP.  The proposal will contribute towards the housing
supply and help meet demand for affordable housing. 
29

Page 30

10.6. Under Policy 11 - Housing, the application site is identified as part of the housing land
supply in the LDP and is included within the settlement boundary of Carluke.  Policy 3
– General Urban Areas and Settlements advises that residential developments on
appropriate sites will generally be acceptable.  The residential development of the site
positively contributes towards the Council’s requirement to maintain a five year
effective supply of housing land provision.  Policy 11 encourages a range of house
size and types to give greater choice in meeting the needs of the local community
whilst recognising demands of the wider housing market area.  In that respect, the
proposal includes a range of two and three bedroom residential units, with terraced
and flatted housing and one bungalow.  The proposal satisfactorily complies with the
aims of Policy 3 – General Urban Areas and Settlements and Policy 11 - Housing of
the LDP and therefore the principle of the proposed development is acceptable. 
10.7. NPF4 Policy 16 – Quality Homes seeks to encourage, promote and facilitate the
delivery of high quality homes, in the right locations.  Development proposals for new
homes on land allocated for housing in LDPs will be supported.  The application site
forms part of allocated housing land, identified in the adopted Local Plan and,
therefore, the proposal complies with Policy 16 of NPF4. 
10.8. Policy 9 Brownfield, vacant and derelict land supports the reuse of brownfield land. 
The proposed development will result in the sustainable reuse of brownfield land which
formerly operated as a mine.  A comprehensive Ground Investigation Report has been
submitted containing survey results, assessments, and recommendations for
foundations, gas emissions, contamination, and mine entries.  As a precaution,
Environmental Services in their consultation response recommended conditions
requiring the submission and implementation of a remediation strategy.  In
consideration, the proposal complies with Policy 9. 
10.9.  Climate Change
NPF4 Policy 1 requires that when considering all development proposals, significant
weight will be given to the global climate and nature crises.  NPF4 Policy 2 Climate
Change and Mitigation expands on this, requiring all new developments to be sited
and designed (1) to minimise lifecycle greenhouse gas emissions as far as possible
and (2) to adapt to the current and future risks from climate change.  In the absence
of a methodology for measuring the emissions which would result from the proposed
buildings, it is considered appropriate at this time to instead consider the general
sustainability of the proposal in land-use planning terms (whether the conversion of
existing building and associated new build enabling development is supportable when
assessed against other relevant policies in NPF4) and use that as an indicator about
whether or not it is likely to minimise emissions and adapt to current and future impacts
of climate change. 
10.10. Policy 2 Climate Change of the LDP seeks to minimise and mitigate against the effects
of climate change by considering various criteria including: being sustainably located;
reuse of vacant and derelict land; avoidance of flood risk areas; incorporating low and
zero carbon generating technologies; opportunities for active travel routes and trips by
public transport; electrical vehicle recharging infrastructure and, where appropriate,
connection to heat networks.  The site is not at risk of flooding, nor will the development
exacerbate flooding elsewhere.  The site layout has been designed in a manner which
maximises solar gain, whilst trees and the retained bund along the western boundary
will mitigate the impact of the southwest prevailing winds.  In consideration, the
proposals would not undermine the objectives of Policy 2.  
30

Page 31

10.11. Layout, siting, and design 
Policy 14 Design, quality and place states: Development proposals will be supported
where they are consistent with the six qualities of successful places which are healthy,
pleasant, connected, distinctive, sustainable and adaptable.   
10.12. The development layout sits back from Goremire Road and intervening embankments
with natural habitats along the northern and western boundaries, which create the
impression of a self-contained, development that will not detract from the local
character. 
10.13. Concerns were raised in relation to the footpath link to the adjacent residential
development to the east on the grounds that residents should not be able to use
amenity facilities in an adjoining residential estate.  However, this link is mutually
accessible and will likewise allow adjoining residents to enjoy amenity and landscaping
in the proposed development and gain safe access to footpath links to Old Lanark
Road.   
10.14. Reasonable walking distances to bus routes, shops, schools, and other services will
help reduce reliance on car journeys.  Provision has been allowed within the design
for Air Source Heat Pumps to minimise impact on the streetscape and located in the
optimal location close to the tank to maximise the efficiency of the system.  In
consideration, the proposed development complies with Policy 14 of NPF4. 
10.15. Policy 15 Local Living and 20 minute neighbourhoods states: ‘Development proposals
will contribute to local living including, where relevant, 20 minute neighbourhoods.  To
establish this, consideration will be given to existing settlement pattern, and the level
and quality of interconnectivity of the proposed development with the surrounding
area, including local access to: sustainable access (including local public transport
and safe, high quality walking, wheeling and cycling networks), employment,
shopping, health and social care facilities, schools and play areas.’ 
10.16. The site lies at the southern periphery of Carluke, within 400m of Lanark Road (A73),
where bus routes can be accessed with a range of facilities within walking distance. 
In view of the circumstances described, the proposal does accord with the aims and
intent of Policy 15 of National Planning Framework 4.  
10.17. Policy 5 - Development Management and Place Making, together with the
Development Management and Placemaking Supplementary Guidance supports
residential developments where they do not have a significant adverse effect on the
amenity of the area.  In addition, any new development must relate satisfactorily to
adjacent and surrounding development in terms of scale, massing, materials, and
intensity of use.  The character and amenity of the area must not be impaired by
reason of traffic generation, parking, overshadowing, overlooking or visual intrusion. 
10.18. Policy DM1- New Development Design reiterates these points and adds that modern
innovative design can reflect local tradition through scale, massing, siting and colour
rather than replicating existing building form.  New houses should be designed in such
a way as to incorporate high speed broadband connection. 
10.19. The proposed dwellings, layout, landscaping, amenity space and footpath links will
enhance an otherwise suburban street scene.  A shadow analysis has been
undertaken which demonstrates that the nearest neighbouring dwellings will not be
significantly affected by overshadowing.  In considering the orientation and intervening
distance between existing and proposed dwellings along with proposed boundary
31

Page 32

fencing and landscaping, privacy standards will not be compromised.  The proposal
complies with guidance in the Residential Development Guide.   
10.20. The proposal will not have a significant impact upon landscape features, protected
habitats, or species.  There are no infrastructure constraints.  Roads and
Transportation Services have not raised any traffic or public safety issues in their
consultation response and conditions are proposed which will ensure that the
proposed roads and footways are completed at the appropriate time and that
disruption during construction is minimised and effectively managed.  Adequate
parking, turning areas and access can be provided. 
10.21. Natural and Historic Heritage 
NPF4 Policy 3 Biodiversity states that development proposals should contribute to the
enhancement of biodiversity, including where relevant, restoring degraded habitats,
and building and strengthening nature networks and the connections between them. 
NPF4 Policy 3 Biodiversity seeks to protect biodiversity, reverse biodiversity loss,
deliver positive effects from development and strengthen nature networks.  To ensure
that such measures are implemented, suitable conditions on the landscaping of the
site have been recommended below.  The proposal is therefore considered to comply
with Policy 3 Biodiversity of National Planning Framework 4.   
10.22. The site is not designated nor are there plans for it to be designated as a site important
for its habitat and biodiversity.  The proposal will not impact directly or indirectly upon
any nearby designated sites.  An ecological survey has been undertaken which has
not identified any adverse impacts upon protected species, subject to
recommendations for the retention of mature beech trees with bat roosting potential,
pre-site start badger surveys, removal of non-native invasive species and avoidance
of light overspill in woodland habitat.  Conditions are proposed to ensure compliance
with these recommendations along with a requirement for the submission, approval,
and implementation of a Biodiversity Management Plan. 
10.23. Technical Matters
The site is not at risk from flooding as the nearest surface water feature is a burn
located 30m to the south.  The Drainage Impact Assessment, submitted as supporting
information, concludes that it is not considered that the additional flows from the
development constitute a material increase in flood risk.  Given the topography of the
site, the drainage solution incorporates a loop running from the highest point of the
site entrance, running to the lower part of the site where it will discharge to the public
network, via the proposed SUDS solution. 
10.24 Surface water drainage will be attenuated in below ground attenuation tanks after
being filtered/treated by SUDS via porous paviours in the driveways and then along
treatment trenches.  The proposed drainage for the site will comprise a separate foul
and surface water system that will discharge to the existing surface water and foul
water sewers.  Scottish Water have advised that there is sufficient capacity in the
sewerage network.  The Flood Unit have not objected subject to a condition requiring
a flood risk assessment.  The surface water run off rate, post development, will not
exceed the current greenfield run off and therefore will not impact upon the existing
surface water sewer. 
10.25 Records indicate that there are three mineshafts within or immediately adjacent to the
site, along the eastern boundary.  One mineshaft has been identified whilst the other
two have still to be located.  Trenching investigations indicate that one mineshaft lies
out with the application site boundary.  The third mineshaft will have to be located by
probe drilling.  The mineshafts will have to be consolidated with grout injection and
32

Page 33

reinforced concrete caps.  There will be no development or construction, with potential
to undermine ground stability, in standoff zones around these mine entries.  The
development layout and housing avoid these standoff areas. 
10.26 Conclusion
The proposal will result in the development of a designated housing site which will
provide and meet demand for affordable rented housing in Carluke.  The retention of
scrub habitat and mature trees around the periphery will allow for sensitive integration
into the wider landscape setting whilst referencing biodiversity aims.  In view of the
above assessment and supporting information, the proposal represents an
appropriate form of residential development for the application site and neighbouring
vicinity. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Full Planning Permission subject to conditions:- 
1.  The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice.   
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
2. That before any development commences on site or before any materials are
ordered or brought to the site, details and samples of all materials to be used as
external finishes on the development shall be submitted to and approved by the
Council as Planning Authority. 
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
3. That before development starts, full details of the design and location of all fences
and walls, including any retaining walls, to be erected on the site shall be
submitted to and approved by the Council as Planning Authority. 
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
4. The tree protection measures, and arboricultural recommendations listed in the
Tree Survey and Arboricultural Report (Langton Tree Specialists, August 2021)
shall be fully complied with. 
Reason: To ensure that the trees to be retained will not be damaged during
construction and to protect and enhance the appearance and character of the
site and locality. 
5, That the approved landscaping scheme shall be carried out simultaneously with
the development, or each phase thereof, and shall be completed and thereafter
maintained and replaced where necessary to the satisfaction of the Council as
Planning Authority. 
Reason: In the interests of the visual amenity of the area.  
33

Page 34

6. That the landscaping scheme as shown on the approved plan shall be completed
to the satisfaction of the Council as Planning Authority during the first available
planting season following occupation of the building(s) or the completion of the
development hereby approved, whichever is the sooner.   
Reason: In the interests of the visual amenity of the area. 
7. That prior to any work commencing on the site, a maintenance management
schedule for the approved landscaping scheme shall be submitted to and
approved by the Council as Planning Authority.   
Reason: In the interests of the visual amenity of the area. 
8. A Biodiversity Management Plan as recommended by the Landscape
Assessment shall be submitted to and approved by the Council as Planning
Authority.   
Reason: In the interests of biodiversity. 
9. The recommendations and mitigation measures (including: pre bat checks if
mature beech trees, identified for retention, are to be removed; maintenance of
30m buffer if bat roost found; avoidance of vegetation clearance during bird
nesting season; removal of non-native invasive species; retention of hedgerows
and trees along boundaries: avoidance of light overspill into woodland habitat
and; pre-works badger survey) as listed in the Extended Phase 1 Habitat and
Aerial Tree Survey (Wild Surveys Ltd, July 2021) shall be fully complied with.   
Reason: In the interests of biodiversity and wildlife. 
10. That before any work commences on the site, a scheme for the provision of play
area(s) within the site shall be submitted to the Council as Planning Authority for
written approval and shall include:(a) details of the type and location of play
equipment, seating and litter bins to be situated within the play area(s); (b) details
of the surface treatment of the play area, including the location and type of safety
surface to be installed; (c) details of the fences to be erected around the play
area(s); and (d) details of the phasing of these works unless agreed in writing by
the Council as Planning Authority.     
Reason: To ensure the provision of adequate play facilities within the site and in
order to retain effective planning control. 
11. That prior to the completion or occupation of the last dwellinghouses within the
development, all of the works required for the provision of equipped play area(s)
included in the scheme approved under the terms of Condition 10, shall be
completed.   
Reason: To ensure the provision of adequate play facilities within the site. 
12. That proposals for the maintenance of all areas of open space/play areas within
the development shall be submitted to the Council as Planning Authority and no
work on the site shall be commenced until the permission of the Council has been
granted for these proposals or such other proposals as may be acceptable. 
Reason: In the interests of the visual amenity of the area.  
34

Page 35

13.  That no development shall commence until details of surface water drainage
arrangements have been submitted to and approved in writing by the Council as
Planning Authority; such drainage arrangements will require to comply with the
principles of sustainable urban drainage systems and with the Council's
Developer Design Guidance (May 2020) and shall include the following signed
appendices: C 'Sustainable Drainage Design Compliance certificate', D
'Sustainable Drainage Design Independent Check Certificate' and E
'Confirmation of Future Maintenance of Sustainable Drainage Apparatus'.  The
development shall not be occupied until the surface drainage works have been
completed in accordance with the details submitted to and approved in writing by
the Council as Planning Authority.       
Reason: To ensure that the disposal of surface water from the site is dealt with
in a safe and sustainable manner, to return it to the natural water cycle with
minimal adverse impact on people and the environment and to alleviate the
potential for on-site and off-site flooding. 
14. Prior to the commencement of works on site, the applicant will require to submit
a flood risk assessment for the consideration and approval of the Council.  Self-
certification and independent check certificates appendices A and B (refer to the
Council's developer design guidance May 2020) duly signed by the relevant party
are to be submitted.   
Reason: To ensure that works proposed are not at risk of flooding and will not
increase the likelihood of flooding elsewhere.  
15. Prior to the commencement of works on site, the developer will require to provide
confirmation from Scottish Water that they are willing to accept the drainage
discharge and design.   
Reason: To ensure that the site will be effectively drained. 
16. No piling works shall be carried out until a method statement has been submitted
to and approved in writing by the Planning Authority.  This statement shall include
an assessment of the impact of the piling on surrounding properties, taking into
account the guidance contained in BS 6472: 1992 'Evaluation of human exposure
to vibration in buildings'.  It shall detail any procedures which are proposed to
minimise the impact of noise and vibration on the occupants of surrounding
properties.  This statement shall be prepared by a suitably qualified person, and
the piling works shall thereafter be carried out in accordance with the approved
method statement.   
Reason: To minimise noise, vibration and disturbance to neighbouring
residents/occupants during blasting. 
17. A detailed remediation strategy will be submitted to and approved in writing by
the Council as Planning Authority.  No works other than investigative works shall
be carried out on site prior to receipt of the Council's written approval of the
remediation plan.   
Reason: To avoid unacceptable risks to human health and the environment, to
ensure that the land is remediated and made suitable for its proposed use.  
35

Page 36

18. (a) Remediation of the site shall be carried out in accordance with the approved
remediation plan prior to the proposed development being brought into use.  Any
amendments to the approved remediation plan shall not be implemented unless
approved in writing by the Council as Planning Authority.   
(b) On completion of the remediation works, the developer shall submit a
completion report to the Council as Planning Authority, confirming that the works
have been carried out in accordance with the approved remediation plan and that
the works have successfully reduced these risks to acceptable levels. 
(c) Any previously unsuspected contamination which becomes evident during the
development of the site shall be brought to the attention of the Council as
Planning Authority within one week or earlier of it being identified.  A more
detailed site investigation to determine the extent and nature of the
contaminant(s) and a site-specific risk assessment of any associated pollutant
linkages, shall then require to be submitted to and approved in writing by the
Council as Planning Authority.   
Reason: To avoid unacceptable risks to human health and the environment, to
ensure that the land is remediated and made suitable for its proposed use.  
19. Prior to development commencing on site, a scheme for the control and mitigation
of dust shall be submitted to and approved in writing by the Council as Planning
Authority.  No changes to the approved scheme shall take place unless agreed
in writing by the Council as Planning Authority.  The scheme shall thereafter be
implemented in accordance with a programme to be agreed in writing with the
Council as Planning Authority.   
Reason: To minimise the risk of nuisance from dust to nearby occupants. 
20. Prior to commencement of the development hereby approved, details of
measures to facilitate the provision of full fibre broadband to serve the
development, including details of appropriate digital infrastructure and a
timescale for implementation, shall be submitted to and approved in writing by
the Council as Planning Authority, unless otherwise agreed in writing with the
applicant.  The approved measures shall thereafter be carried out in accordance
with the agreed implementation timescale.   
Reason: To ensure the provision of digital infrastructure to serve the
development. 
21. Prior to the commencement of development on site, an energy statement
covering the new build element of the approved development which
demonstrates that on-site zero and low carbon energy technologies contribute at
least an extra 10% reduction in CO2 emissions beyond the 2007 building
regulations carbon dioxide emissions standard, shall be submitted to and
approved in writing by the Council as Planning Authority.  The statement shall
include:-   
a) the total predicted energy requirements and CO2 emissions of the
development, clearly illustrating the additional 10% reduction beyond the 2007
building regulations CO2 standard; 
36

Page 37

b) a schedule of proposed on-site zero and low carbon energy technologies to
be included in the development and their respective energy contributions and
carbon savings;   
c) an indication of the location and design of the on-site energy technologies; and   
d) a maintenance programme for the on-site zero and low carbon energy
technologies to be incorporated.   
Reason: To secure a reduction in carbon dioxide emissions. 
22. The approved on-site zero and low carbon energy technologies shall be fully
installed and operational prior to the occupation of any approved buildings and
shall thereafter be maintained and shall remain fully operational in accordance
with the approved maintenance programme, unless otherwise agreed in writing
by the Council as Planning Authority. 
Reason: To secure the timeous implementation of on-site zero and low carbon
energy technologies. 
23. That prior to the commencement of works, details and locations of charging
points for electrical cars, at a rate of one charging point per house plot, shall be
submitted for the written approval of the Council as Planning Authority.  Prior to
the completion of the development the approved charging points shall be
installed and available for use.     
Reason: To ensure facilities for recharging electrical cars are available for the
use of the residents. 
24.  That no dwellinghouse shall be occupied until the developer provides a written
agreement from Scottish Water that the site can be served by a sewerage and
water scheme constructed to the specification and satisfaction of Scottish Water
as the Water and Sewerage Authority.   
Reason: To ensure that the development is served by an appropriate effluent
disposal system and water supply. 
25. Prior to the development hereby approved being brought into use, the entire
access road and footpath network serving the development shall be laid out and
constructed in accordance with the specification of the Council as Roads and
Planning Authority. 
Reason: To ensure the provision of satisfactory vehicular and pedestrian access
to the dwellings. 
26. Prior to the development hereby approved being brought into use, all of the
parking spaces shown on Drawing 2770 L(90)02 Rev E shall be laid out,
constructed and available for use. 
Reason: To ensure the provision of adequate parking facilities within the site. 
27.   Prior to the development hereby approved being brought into use, a visibility
splay of 2.5 metres by 43 metres (as shown in Drawing 2770 L(90) Rev E), shall
be provided on both sides of the vehicular access on to Goremire Road. 
37

Page 38

Reason: In the interests of traffic and public safety. 
28.   Prior to the development hereby approved being brought into use, visibility splays
shall be provided at each driveway in accordance with the approved plans. 
Reason: In the interests of public safety. 
29.   Prior to the development hereby approved being brought into use, a 3 metre wide
shared footway/cycleway shall be constructed through the site which connects
Old Lanark Road in the west, to Goremire Road in the east.  The shared
footway/cycleway shall be completed to the specification of the Council as Roads
and Planning Authority. 
Reason: In the interests of public safety. 
30.   That the first 2 metres of each driveway as measured from the heel of the
footway/service strip shall be hard surfaced across its full width to prevent
deleterious material being carried onto the road. 
Reason: In the interests of traffic and public safety. 
31.   That prior to the commencement of any works associated with the development,
a Construction Traffic Management Plan shall be submitted to and approved in
writing by the Council as Roads and Planning Authority and implemented
thereafter.  This plan should include details of access and parking provision for
staff and visitors, intended working hours, the management and storage of
deliveries and further information regarding the provision of wheel washing
facilities to prevent mud being carried on to the adopted road. 
Reason: In the interests of traffic and public safety as well as to preserve the
amenity of the surrounding area. 
32.  The development hereby approved shall consist of social housing only, operated
by a Registered Social Landlord unless otherwise agreed in writing with the
Council as Planning Authority. 
Reason: In order to retain effective planning control. 
12 Reason for Decision
12.1. The proposal will not adversely impact on visual amenity, landscape quality, raises no
road safety concerns and helps meet demand for affordable housing.  The proposal
accords with Policies 1, 2, 3, 8, 9, 14, 15 and 16 of National Planning Framework 4
and policies 1, 2, 3, 4, 5, 11, 13 and DM1 of the South Lanarkshire Local Development
Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date:  28 August 2023 
38

Page 39

Background Papers
Further information relating to the application can be found online:- 
P/22/0205 | Erection of residential development (81 dwellings) with associated roads,
parking, amenity space and associated works. | Land 115M South Of 122 Goremire Road
Goremire Road Carluke 
Corporate Considerations
The report raises no impacts or risks in terms of equalities however financial contributions
may be required to extend capacity for schools affected by an increase in pupil numbers. 
Any implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
39

Page 40

40

Page 41

Report
Agenda Item 
CHECKED
Report to: Planning Committee
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/22/0345 
Proposal:  Change of use of farm steading to form two dwellings, restoration of
farmhouse to form one dwelling, erection of three dwelling houses
and associated access improvements (renewal of planning
application P/18/0374)
Site Address:  Orchard Farm
Waygateshaw Road
Carluke 
Applicant:  Taylor Homes (Scotland) Limited 
Agent:  Taylor Homes (Scotland) Limited 
Ward:  01 Clydesdale West
Application Type:  Full Planning Permission
Advert Type:  Non notification of neighbours and development affecting the setting
of Listed Building: Lanark Gazette 27 April 2022
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant Subject to Conditions
Legal Agreement:  Not Required
Direction to
Scottish Ministers 
Not Required 
5
41

Page 42

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee within the
context of the approved Planning Application Decision Making Process (2015) as more
than 5 representations have been submitted in relation to the proposals. 
2. Site Description
2.1. The application site is situated in the designated green belt between Crossford and
Braidwood on a small plateau above the River Clyde.  It is enclosed by mature
woodland and sloping ground to the south and east, whilst to the west, the land falls
to the River Clyde floodplain.  To the south-west of the farm steading lie the listed
buildings of the Italian Garden and Orchard House Nursing Home.  These properties
are screened from the steading buildings by the nature of the local topography and
mature woodland.   
2.2. To the west and south of the steading group, the fields were planted with orchard trees
and the presence of a number of ancillary potting or storage sheds are evidence that
the orchards were at one time run commercially.  The lack of maintenance, time and
grazing by horses have all affected the vitality of the trees within the orchards. 
However, the remnants provide an appreciation of the history and special character of
Orchard Farm. 
2.3. Access to the steading is taken from the unclassified Waygateshaw Road via an
unsurfaced access track which continues down the north side of the steading, to the
orchards to the south and west of the farmhouse.  A private driveway to Orchard House
adjoins the site to the south. 
3. Description of Proposed Development
3.1. The applicant seeks renewal of planning permission P/18/0374 (itself a renewal of the
original Planning Permission CL/12/0180) which was granted on 7 March 2019 for the
restoration and conversion of Orchard Farm to form three dwellings and the erection
of three new dwellings.  These new houses would be situated in the Farm’s former
orchard to the west and in a field to the south-east.  Orchard Farm is a former farm
steading listed as Category B for its architectural merit and lies within the Green Belt. 
3.2. The restoration works involve the infilling of doorways and formation of new window
openings where required.  Parking would be around the outside of the courtyard, along
with other infrastructure provision.  Listed Building Consent P/22/0420 for the works
to convert and renovate the listed buildings was approved under delegated powers in
October 2022. 
3.3. In addition, the applicant proposes to erect 3 individually designed detached houses. 
They are identified as enabling development associated with the conversion and
renovation of the listed farm buildings.  The first property would be located 80 metres
to the front (or west elevation) of the original farmhouse and partly in the orchard.  A
second property would be constructed next to the farm steading, in a paddock to the
north-west, 70 metres from the farm steading at the closest point.  These two dwellings
would be accessed from the private track which currently serves Orchard Farm.  In
order to afford privacy to the occupants of the conversion, this track would be deviated
slightly to the north.  The third dwelling would be constructed on lower ground to the
south-east of Orchard Farm, which historical maps identify as being the location of a
curling pond.  This house would be accessed from the private road which serves
Orchard House Nursing Home, Orchard House Lodge and the Italian Garden.  The
access would require a culvert across a small burn and reconfiguration of ground
levels to form a level platform for the house and detached garage.  
42

Page 43

3.4. Within a Design and Access Statement, submitted as supporting information with the
original Planning Application CL/12/0180, the applicant advised that the age of the
trees within the orchard adversely affect its viability, and that the orchard would be
replanted along with the introduction of hedging to provide screening. 
3.5. The new-build houses are all two-storey, however, each would have a different design. 
Two of the houses would have five bedrooms, while the largest would have six.  In
addition, houses 1 and 2 would have detached garages.  The external walls would use
a mixture of three materials - stone, slate walling, and weatherboarding, while the roofs
would be slate or due to roof designs, metal cladding. 
4. Relevant Planning History
4.1. Planning permission (CL/12/00180) was granted on 1 April 2015 for the restoration
and conversion of the farmhouse and steading and for the three new dwellings as
enabling development (renewed by Planning Permission Planning P/18/0374 on 1
April 2019). 
4.2. A report recommending the removal of the need for a Section 75 planning obligation
and amendment to planning conditions which were attached to the planning
permission (Ref. CL/12/0180) was approved by the Planning Committee in January
2015. 
4.3. Listed Building Consent (Ref. CL/12/0292) for the restoration and alteration of the B-
Listed farmhouse and steading was granted in August 2013.  After it expired, another
Listed Building Consent (Ref. P/22/0420), for the same proposal was granted in
October 2022. 
4.4. The current application was submitted on 9 March 2022 prior to the expiration of the
first renewal.  This represents the second renewal.  It should be noted that even if a
renewal had not been submitted prior to the original expiration period, the associated
Town and Country Planning (Emergency Period and Extended Period (Coronavirus)
(Scotland) Regulations 2021 extended planning permissions which would otherwise
have lapsed during the emergency period until March 2023. 
5. Supporting Information 
5.1. In support of the planning application, the applicant has submitted:- 
i) Orchard Farm Refurbishment Costs, March 2023 – provides updated
construction costs and estimated sales value
ii) NPF4 Supporting Statement - this sets out policy context in terms of NPF4 and
seeks to justify the proposal 
6. Consultations
6.1. Environmental Services – no objections subject to conditions covering contaminated
land investigations, site remediation and informatives relating to construction noise,
nuisance, asbestos, pest control, contaminated land register and use of septic tank.
Response - Noted. 
6.2. Flood Unit – Recommend that a condition should be attached requiring the installation
of a Sustainable Urban Drainage System (SUDS) to ensure the post development
surface water run-off is managed appropriately. 
Response – Noted. 
43

Page 44

6.3. Roads and Transportation Services – No objection to the proposed development
subject to conditions relating to access, visibility, and drainage.
Response - Noted. 
6.4. The Coal Authority – The Coal Authority concurs with the recommendations of the
previously submitted Coal Mining Risk Assessment; that coal mining legacy potentially
poses a risk to part of the proposed development and that intrusive site investigation
works should be undertaken prior to development to establish the exact situation
regarding coal mining legacy issues on the site.  They have no objection to the
proposed development subject to the imposition of conditions requiring intrusive
investigations and site remediation/mitigation measures at Plot 3 of the proposed
development. 
Response - Noted. 
6.5. Historic Environment Scotland (HES) – HES commented on the Listed Building
application (Ref. P/22/0420) for the conversion and restoration of the B-Listed
farmhouse and steading and offered no objections. 
Response – Noted. 
6.6. Scottish Environmental Protection Agency (SEPA) -   No objection.  No Flood Risk
issues were identified by South Lanarkshire Council in the original application.  If there
are flood risk concerns, SEPA should be reconsulted, stating the nature of flood risk
issues at this site. 
Response - Noted. 
6.7. West of Scotland Archaeology Service – No Objection.  Orchard Farm was depicted
on the 1st edition Ordnance Survey map and the placename ‘Orchard’ appeared on
Roy’s Military Survey of Scotland 1747-55.  The current farm buildings may have been
erected in the 19th century to replace an earlier pre-improvement settlement.  A pre-
start condition is required to ensure that a programme of archaeological works is
implemented. 
Response – Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement in the local
press, a total of 7 objections have been received.  The issues raised are summarised
as follows:-   
Objections:- 
Amenity
⧫ Detract from the character and appearance of the rural area.
⧫ The three additional dwellings detract from the original character of the
existing buildings and its setting. 
Land Use Concerns 
⧫ Contrary to Local Plan policies, in particular, Policy 2 ‘Climate Change’.
⧫ The site lies within greenbelt and a Special Landscape Area. 
Impact on Natural and Historic Environment
⧫ Not possible to assess the impact upon a Listed Building.
⧫ Loss of habitat.
⧫ There is an abundance of wildlife, and more development reduces habitat and
stresses wildlife.  
44

Page 45

Roads Related Matters
⧫ Impact upon traffic safety.
⧫ Not demonstrated how access to the greenspace network is provided or
indeed is currently protected.
⧫ Deteriorating condition of the road. 
Other Matters Raised
⧫ Repeat of previous refusal.
⧫ The site is an agricultural unit and not vacant development land.
⧫ Future pressure on electricity infrastructure. 
7.2. Other non-material planning comments were included in representations.  These
points relate to:- 
⧫ The proposal is not supported by demand.
⧫ Sufficient planning permissions elsewhere. 
7.3. The above issues are considered in the assessment below.  These letters are available
for inspection on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  The development plan comprises the
South Lanarkshire Local Development Plan 2 and National Planning Framework 4. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
The relevant NPF4 policies are as follows:- 
 Policy 1 Tackling the climate and nature crises
 Policy 2 Climate mitigation and adaptation
 Policy 3 Biodiversity
 Policy 4 Natural places
 Policy 7 Historic assets and places
 Policy 8 Green belts
 Policy 14 Design, quality and place
 Policy 15 Local Living and 20 minute neighbourhoods 
8.3. South Lanarkshire Local Development Plan 2 (SLLDP2) 
For the purposes of determining planning applications, the Council will, therefore, also
assess proposals against the policies contained within the adopted SLLDP2.   
8.4. In this regard the application site and associated proposals are affected by the
following policies contained in the SLLDP2:-  
45

Page 46

SLLDP2 Volume 1 Policies
 Policy 2 Climate Change
 Policy 4 Green Belt and Rural Area
 Policy 5 Development Management and Placemaking
 Policy 14 Natural and Historic Development 
SLLDP2 Volume 2 Policies
 Policy GBRA1 Rural Design and Development
 Policy GBRA4 Conversion and Re-use of Existing Buildings
 Policy DM8 Enabling Development
 Policy NHE3 Listed Buildings
 Policy NHE16 Landscape 
9. Guidance
9.1. None 
10. Assessment and Discussion
10.1. Government guidance states that applications to renew existing consents should be
granted unless:- 
(i) there has been a material change in planning circumstances since the original
permission was granted; 
(ii) there is a continued failure to commence the development and it would contribute
unacceptably to uncertainty about the future pattern of development in the area;
and/or, 
(iii) if the application is premature because the permission still has a reasonable time
to run.   
10.2. Since the previous renewal was issued in April 2019, the South Lanarkshire Local
Development Plan 2 was adopted in January 2021 and the National Planning
Framework4 (NPF4) was published in February 2023.  The relevant development plan
policies against which this renewal should be assessed are listed in paragraphs 8.2
and 8.4 above, whilst the assessment of these policies will be considered below. 
10.3. Principle of Development 
The proposal involves the re-use and rehabilitation of an important B-Listed building
and although there is no specific reference to necessary enabling development in
Policy 8 of NPF4, this is referred to and justified under the terms of Policy 7 Historic
assets and places, which the proposal is considered to comply with. 
10.4. The character of the established countryside and landscape will not be adversely
affected, the new build element has been appropriately designed and sited, the
restoration works, and planting scheme will enhance environmental quality and the
purpose of the green belt will not be undermined.  In this instance, the long-term future
of an important historic asset within the green belt cannot be secured without enabling
development in the same location to contribute to the significant costs of the listed
building refurbishment.  The retention of this heritage asset, and the means to bring
that retention about, are therefore considered to enhance the landscape character and
long-term environmental quality of the green belt in this location.  
46

Page 47

10.5. In terms of Local Development Plan (LDP) policy, the application site lies within the
green belt and is subject to assessment against Policy 4 - Green Belt and Rural Area. 
This states that the purpose of the green belt is to: direct development to the most
appropriate locations and support regeneration, protect and enhance the character,
landscape setting and identity of the settlement, protect and provide access to open
space.  Development which does not require to locate in the countryside will be
expected to be accommodated within the settlements identified on the proposals map. 
There are several instances where small scale residential developments could be
acceptable set out in LDP and, in this case, the relevant policies are described below. 
10.6. GBRA4 Conversion and Re-use of Existing Buildings list a range of criteria which are
relevant to the proposal and are as follows:- 
1. Buildings shall be of a local, visual or historical merit which generally relates to
traditionally constructed buildings.
2. Buildings shall be suitable for conversion and a structural survey submitted to
determine the condition of the building to demonstrate that it is capable of
conversion to the proposed use.
3. The structure, form, setting, historic and architectural integrity of the original
buildings shall be respected and preserved so that they retain their traditional
appearance after conversion.
4. Any alterations, extensions or increase in height of the original building shall be
carried out sympathetically without detrimentally affecting the proportions or
character of the original building. 
10.7. It has already been established by the previous renewal, Listed Building Consent and
Planning Permission and structural survey (submitted as supporting information with
the original planning application), inspections and protective works undertaken to date
that the conversion and alterations are appropriate. 
10.8. Policy DM8 - Enabling Development advises that proposals for single houses or small-
scale housing shall be considered where it is required to fund works to a Listed Building
or other significant historical asset.  Proposals will be required to meet the following
criteria:- 
 It requires to be demonstrated that this is the only means to prevent the loss of the
asset and secure its long-term future. 
 Evidence is required in all cases to demonstrate that other sources of funding have
been pursued and why these are unavailable or unable to fully fund the project.
 Any new development shall be the minimum necessary to bridge any gap in
funding to achieve the works required.
 A business plan will be required.  The expected demand and sale price of the
proposed dwelling(s) shall be evidenced and based on a local market assessment.
 The development shall be designed and sited carefully to preserve and enhance
the character and setting of the historical asset and the surrounding landscape or
townscape.
 The location, siting and design of the new house(s) shall meet existing design
policy and guidance as set out in SLLDP2 and supporting planning guidance. 
In all cases, a Section 75 obligation and/or planning condition will be required to control
the phasing of the works in relation to the proposed dwellings.  
47

Page 48

10.9. The case for justifying the enabling development is set out below, relating to Policy 7
– Historic assets and places.  Compliance with relevant historic environment policies
is also discussed below.  Conditions to control phasing will be applied in the event
approval is granted.  In consideration, the proposed development complies with
Policies 4 - Green Belt and Rural Area, GBRA4 – Conversion and Re-use of Existing
Buildings and DM8 – Enabling Development of the LDP. 
10.10. Climate Change 
NPF4 Policy 1 requires that when considering all development proposals, significant
weight will be given to the global climate and nature crises.  NPF4 Policy 2 Climate
Change and Mitigation expands on this, requiring all new developments to be sited
and designed (1) to minimise lifecycle greenhouse gas emissions as far as possible
and (2) to adapt to the current and future risks from climate change.  In the absence
of a methodology for measuring the emissions which would result from the proposed
buildings, it is considered appropriate at this time to instead consider the general
sustainability of the proposal in land-use planning terms (whether the conversion of
existing building and associated new build enabling development is supportable when
assessed against other relevant policies in NPF4) and use that as an indicator about
whether or not it is likely to minimise emissions and adapt to current and future impacts
of climate change. 
10.11. Policy 2 Climate Change seeks to minimise and mitigate against the effects of climate
change by considering various criteria including: being sustainably located; reuse of
vacant and derelict land; avoidance of flood risk areas; incorporating low and zero
carbon generating technologies; opportunities for active travel routes and trips by
public transport; electrical vehicle recharging infrastructure and where appropriate
connection to heat networks.  The site is not at risk of flooding.  If Planning Permission
is granted, conditions will be attached requiring the submission and approval of details
for low carbon technology, for a tree planting scheme, protection measures for
retained trees and the installation of electric vehicle charging points.  The proposal
involves the re-use of a vacant building which ties in with the objectives of
sustainability.  In consideration, the proposals would not undermine the objectives of
Policy 2.  
10.12. Layout, Siting and Design
Policy 14 Design, quality and place advises that development proposals will be
supported where they are consistent with the six qualities of successful places which
are: healthy, pleasant, connected, distinctive, sustainable and adaptable. 
10.13. The conversion of the farmhouse and steading finds a new use for the structure and
represents a sustainable adaptation of an important built heritage resource, thereby
securing its long-term future.  The new dwellings will be located a respectful distance
from the Listed building and will integrate successfully, without impacting upon amenity
or the rural character of the area.  In consideration the proposed development
complies with Policy 14 of NPF4. 
10.14. Policy 15 Local Living and 20 minute neighbourhoods states: ‘Development proposals
will contribute to local living including, where relevant, 20 minute neighbourhoods.  To
establish this, consideration will be given to existing settlement pattern, and the level
and quality of interconnectivity of the proposed development with the surrounding
area, including local access to: sustainable access (including local public transport and
safe, high quality walking, wheeling and cycling networks), employment, shopping,
health and social care facilities, schools and play areas.’  
48

Page 49

10.15. The site is in countryside some distance from the nearby settlement of Crossford and
is not capable of achieving many of the characteristics of the 20-minute neighbourhood
or achieving wider local-living aspirations.  Notwithstanding this, for the fit able
pedestrian there is a path from the site down to the river edge where it joins the Clyde
walkway, a good quality path connecting through to Crossford, where a range of
services/facilities can be accessed.  In view of the circumstances described, the
proposal does not fully accord with the aims and intent of Policy 15 of National
Planning Framework 4. 
10.16. The proposed development has also been considered against Policies 5 ‘Development
Management and Place Making’ and GBRA1 ‘Rural Design and Development’. 
Overall, the layout, design and appearance of the proposals are considered to be
acceptable. 
10.17. In their consultation response, Roads and Transportation Services have not raised any
public or traffic safety concerns subject to appropriate conditions.  Conditions are
recommended to ensure there will be no significant impact upon landscape features,
valuable habitats, or protected species.  A development of this size will not impact
upon infrastructure, services or capacity within schools serving the local catchment. 
10.18. Although concerns were raised about future pressure on electricity infrastructure, there
is no evidence to substantiate these concerns and ultimately, it is the responsibility of
energy providers to ensure the supply is uninterrupted.  There will be no identified
impact upon the existing path network and should planning consent be granted, a
condition would be utilised requiring details of public access across the site.  There
would not be an adverse impact on neighbouring residential amenity due to
overlooking and overshadowing and the level of light emission will not be significant,
being similar to that omitted from existing properties.  The proposal is therefore
satisfactory in terms of Policies 5 and GBRA1 of the LDP. 
10.19. Natural and Historic Heritage
NPF4 Policy 3 Biodiversity states that development proposals should contribute to the
enhancement of biodiversity, including where relevant, restoring degraded habitats,
and building and strengthening nature networks and the connections between them. 
The original application (CL/12/0180) was supported by an ecological assessment
which contains recommendations relating to the protection and enhancement of
wildlife, habitats and flora.  A protected species survey was also carried out prior to the
determination of the original application in July 2012 which made various
recommendations.  Consequently, the relevant planning permission included a
condition requiring an update to the ecology report.  That condition will be replicated
in any consent to be issued and will include a requirement for any mitigation measures
proposed in the report to be implemented.  Biodiversity would be further enhanced by
a proposed tree planting scheme and retained trees on site would be protected by
condition.  Overall, the proposal would comply with the objectives of this policy subject
to compliance with all said conditions, and the implementation of the recommendations
contained within an updated ecological assessment. 
10.20. NPF4 Policy 4 Natural Places is of relevance due to the site falling within a designated
Special Landscape Area as identified in the adopted Local Plan.  The policy states
‘Development proposals that affect a site designated as a local nature conservation
site or landscape area in the LDP will only be supported where: Development will not
have significant adverse effects on the integrity of the area or the qualities for which it
has been identified’.  The siting of the new houses would respect the historic
development pattern in this part of the Clyde Valley and would not appear out of place. 
They are sited so that the setting of the steading would not be adversely affected.  In
49

Page 50

addition, existing trees, and proposals to reinforce this planting including the
restoration of an historic orchard would further aid the integration of the development. 
10.21. The scale, materials and design of the three new dwellings reflects some of the
characteristics found in the local rural area and the mix of materials and building
proportions add a modern interpretation to construction rather than being a pastiche
of the listed buildings.  In addition, the site is reasonably self-contained and the new
houses would not be noticeably prominent in the setting of the wider landscape.  The
backdrop of the existing farm steading and undulating topography, along with tree
planting should ensure visual containment of the proposals in the surrounding
landscape and, as such, the proposal will not have an adverse impact upon the
qualities and character of the designated Special Landscape Area.  Therefore, the
proposal is considered acceptable with regards to Policy 4 of NPF4. 
10.22. NPF4 Policy 7 Historic assets and places states ‘Development proposals for the reuse,
alteration or extension of a listed building will only be supported where they will
preserve its character, special architectural or historic interest and setting. 
Development proposals affecting the setting of a listed building should preserve its
character, and its special architectural or historic interest.  Development proposals
which sensitively repair, enhance and bring historic buildings, as identified as being at
risk locally or on the national Buildings at Risk Register, back into beneficial use will
be supported.  Enabling development for historic environment assets or places that
would otherwise be unacceptable in planning terms, will only be supported when it has
been demonstrated that the enabling development proposed is:- 
i. essential to secure the future of an historic environment asset or place
which is at risk of serious deterioration or loss; and 
ii. the minimum necessary to secure the restoration, adaptation and long-
term future of the historic environment asset or place. 
The beneficial outcomes for the historic environment asset or place should be secured
early in the phasing of the development and will be ensured through the use of
conditions and/or legal agreements’. 
10.23. Orchard Farm and steading is a B listed building which has been on the buildings at
risk register since 1998.  In the intervening period since the original approval, an
agreed schedule of protective works was undertaken to protect the fabric and structure
of the building although there are still signs of deterioration.  In the case of Orchard
Farm, a full assessment of the proposal to convert it into three dwellings has been
carried out through the associated Listed Building Consent (P/22/0420), granted
October 2022, which concluded that the principle of conversion was acceptable. 
10.24. In support of the original planning application, the applicant has submitted: a financial
costing for the renovation and conversion works, received May 2013 and an economic
justification for the three new dwellings.  Orchard Farm Refurbishment Costs were
updated in March 2023 and submitted as supporting information. 
10.25. In summary, the applicants have submitted that the three new houses are required to
enable the conversion of the listed buildings.  A detailed case has been provided by
the applicant showing the costs of undertaking the refurbishment works to the listed
buildings, along with their projected valuations based on current market values and
the quality of the works proposed to the steading.  This demonstrates that there would
be a significant conservation deficit which would make the conversion of the steading
on its own financially unviable.  This in turn would likely result in the listed buildings
remaining vacant and a potential deterioration in their condition. 
50

Page 51

10.26. Conditions are recommended to ensure: that all protective works are completed and
maintained prior to the sale/occupation of the proposed new dwellings; approval of
phasing details prior to the commencement of development and; approval of external
finishes/colours.  In view of the above assessment, the proposal complies with Policy
7 of NPF4. 
10.27. Policy 14 – Natural and Historic Environment advises that the Council assess all
development proposals in terms of their impact on the natural and historic
environment, including biodiversity, geodiversity, landscape and townscape.  In
Category 3 areas (which includes B and C listed Buildings their settings and Special
Landscape Areas) development which would have a significant adverse impact
following the implementation of mitigation measures will only be permitted where the
effects are outweighed by significant social or economic benefits.  Where possible,
any development proposals which affect natural and historic designations should
include measures to enhance the conservation value of the site affected. 
10.28. Policy NHE3 – Listed Buildings states development affecting the setting of a Listed
Building shall seek to preserve its setting.  The layout, design, materials, scale, siting
and use of any development shall be sensitive to and respect the character and
appearance of the Listed Building and its setting. 
10.29. Policy NHE16 – Landscape advises that development proposals within Special
Landscape Areas will only be permitted where they can be accommodated without
having an unacceptable significant adverse effect on the landscape character, scenic
interest and special qualities and features for which the area has been designated.  All
proposed development should take into account the detailed guidance contained in
the South Lanarkshire Landscape Character Assessment 2010.  The site falls within
the Incised River Valley Landscape/Broad Valley Floor character type where
settlement encroachment and suburban residential development is discouraged.  The
character of these areas would be very sensitive to any measures which resulted in
the loss of natural river landscapes, or the introduction of modern, engineered
structures. 
10.30.The characteristic of the landscape around the Orchard Farm area is of mature
woodland with narrow roads bordered by established hedgerows meaning that views
of the new build houses would be restricted to the immediate locality around Orchard
Farm.  The new build element of the proposal will be viewed against a backdrop of
mature woodland on the western boundary which screens Orchard Farm from views
from the A72.  Views of the development from within the Special Landscape Area will
therefore be restricted to the immediate locality.  No historic or landscape features
which contribute to landscape quality would be affected by the new dwellings and
tree/hedgerow retention, and a scheme of tree planting and orchard restoration will
ensure further integration of the development into its setting. 
10.31 In terms of the impact on landscape character, there are similar low density residential
developments nearby and, as such, this proposal can be integrated without appearing
out of place.  Restoring an important Listed Building and saving it from dilapidation
and continuing deterioration is a positive outcome which will enhance the character of
the local area.  Assessment of details associated with the conversion works to the
listed buildings are acceptable and are subject of Listed Building Consent P/22/0420,
granted in October 2022.  The Special Landscape Area of the Clyde Valley will
therefore not be adversely affected.  The conversion of the listed buildings complies
with the Policy in that their use as dwellings would ensure their longevity.  In
considering the above the proposal complies with Policies 14, NHE3 and NHE16 of
the LDP. 
51

Page 52

11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant subject to conditions:- 
01. That:- 
i) there will be no marketing for sale of any of the three new build dwellings
permitted in terms of this Consent or the plots on which the said new build
dwellings are to be constructed, (which new build dwellings and the plots are
hereinafter referred to as "the new dwellings") where "marketing for sale" means
any advertisement for sale irrespective of the marketing medium employed or
any invitation to sell or otherwise dispose of any ownership interest whatsoever
in any of the new dwellings, whether on the open market or not, or any offer
from any party to acquire any ownership interest whatsoever in any of the new
dwellings; and 
ii) in the event that there is no marketing for sale, there will be no disposal, sale
or lease of any of the new dwellings nor other transfer of any ownership interest
whatsoever in any of the new dwellings, and 
iii) there will be no commencement of operations on the application site as
outlined in red on the approved plan, before and until (First) all of the works
specified in the Protective Works Schedule, Orchard Farm dated April 2015 (the
"Schedule") and submitted by the applicant to the Council as Planning Authority
are carried out and completed to the specification as set out in the Schedule
and (Second) the Council as Planning Authority, acting reasonably, have
confirmed in writing that the Council, as Planning Authority, is fully satisfied that
works as set out in the Schedule have been carried out and completed.   
Following the issue by the Council as Planning Authority of written confirmation
in terms of 1 (Second) above, the works as set out in the Schedule will be
maintained to the satisfaction of the Council as Planning Authority until the
Council as Planning Authority has confirmed in writing that the whole
development permitted by this Consent is completed in full.   
Reason:  To ensure the proper and timeous repair of the listed buildings and
to retain effective planning control.  
02. That prior to the marketing and/or the sale of the proposed new build dwellings
and/or the relevant plots, and prior to any works commencing on the application
site as outlined in red on the approved plans, all of the works specified in the
Protective Works Schedule for Orchard Farm, dated April 2015, shall be
undertaken and thereafter maintained to the specification and satisfaction of the
Council as Planning Authority.   
Reason: To ensure the proper and timeous repair of the listed buildings and to
retain effective planning control. 
03. Details of the phasing of the development shall be submitted to the Council for
approval, and no work shall begin until the phasing scheme has been approved
in writing.  Following approval, the development shall be implemented in
accordance with the approved scheme.   
Reason:  These details have not been provided or approved.  
52

Page 53

04. No earlier than 6 months prior to works commencing on site, the Ecology Survey
(JDC ecology, July 2012) shall be updated and submitted to and approved in
writing by the Council as Planning Authority.  All mitigation measures proposed
therein including where necessary bat licence, installation of bat boxes, 30
metre exclusion zone around any identified badger sett within the application
site, badger method statement and nesting bird method statement shall be
implemented in full, and in accordance with the approved scheme.   
Reason:  In the interests of nature conservation. 
05. No development shall take place within the development site as outlined in red
on the approved plan until the developer has secured the implementation of a
programme of archaeological works in accordance with a written scheme of
investigation which has been submitted by the applicant, agreed by the West of
Scotland Archaeology Service, and approved by the Council as Planning
Authority.  Thereafter the developer shall ensure that the programme of
archaeological works is fully implemented and that all recording and recovery
of archaeological resources within the development site is undertaken to the
satisfaction of the Council as Planning Authority in agreement with the West of
Scotland Archaeology Service.   
Reason:  In order to safeguard any archaeological items of interest or finds. 
06. That no trees within the application site shall be lopped, topped, pollarded or
felled, and no shrubs or hedges shall be removed from the application site
without the prior written consent of the Council as Planning Authority.   
Reason: To ensure the protection and maintenance of the existing trees and
other landscape features within the site. 
07. Prior to the commencement of the development hereby approved (including any
demolition and all preparatory work), a scheme for the protection of the retained
trees, in accordance with BS 5837:2012, including a tree protection plan(s)
(TPP) and an arboricultural method statement (AMS) shall be submitted to and
approved in writing by the Council as Planning Authority. Specific issues to be
dealt with in the TPP and AMS are as follows:- 
a)  Location and installation of services/ utilities/ drainage. 
b)  Methods of demolition within the root protection area (RPA as defined 
in BS 5837: 2012) of the retained trees.     
c)  Details of construction within the RPA or that may impact on the 
retained trees.     
d)  A full specification for the installation of boundary treatment works. 
e)  A full specification for the construction of any roads, parking areas and 
driveways, including details of the no-dig specification and 
extent of the areas of the roads, parking areas and driveways to be 
constructed using a no-dig specification.  Details shall include relevant
sections through them. 
f)  Detailed levels and cross-sections to show that the raised levels of 
surfacing, where the installation of no-dig surfacing within Root 
Protection Areas is proposed, demonstrating that they can be 
accommodated where they meet with any adjacent building damp       
proof courses.    
53

Page 54

g)  A specification for protective fencing to safeguard trees during both 
demolition and construction phases and a plan indicating the                 
alignment of the protective fencing.     
h)  A specification for scaffolding and ground protection within tree 
protection zones.       
i) Tree protection during construction indicated on a TPP and 
construction and construction activities clearly identified as prohibited           
in this area. 
j)  Details of site access, temporary parking, on site welfare facilities,
loading, unloading and storage of equipment, materials, fuels and          
waste as well concrete mixing and use of fires. 
k)  Boundary treatments within the RPA. 
l)  Methodology and detailed assessment of root pruning. 
m)  Arboricultural supervision and inspection by a suitably qualified tree 
specialist. 
n)  Reporting of inspection and supervision. 
o)  Methods to improve the rooting environment for retained and proposed 
trees and landscaping. 
p)  Veteran and ancient tree protection and management. 
The development shall thereafter be implemented in strict accordance with the
approved details.     
Reason:  To ensure that the trees to be retained will not be damaged during
demolition or construction and to protect and enhance the appearance and
character of the site and locality. 
08. All trees to be removed must be replaced by semi-mature/mature trees of a
similar species at the locus to the satisfaction of the Council as Planning
Authority.   
Reason: In the interests of amenity. 
09. That before any work commences on the site, a scheme of landscaping for the
application site as outlined in red on the plans hereby approved, shall be
submitted to the Council as Planning Authority for written approval and it shall
include:(a) proposals to maintain and enhance the biodiversity of the site; (b)
an indication of all existing trees and hedgerows plus details of those to be
retained and measures for their protection in the course of development; (c)
details and specification of all trees, shrubs, grass mix, etc. including, where
appropriate, the planting of fruit/apple trees; (d) details of any top-soiling or
other treatment to the ground; (e) sections and other necessary details of any
mounding, earthworks and hard landscaping; (f) proposals for the initial and
future maintenance of the landscaped areas; (g) details of the phasing of these
works. 
For the avoidance of doubt no work shall be undertaken on the site until
approval has been given to these details.   
Reason: In the interests of the visual amenity of the area.  
54

Page 55

10. That the landscaping scheme relating to the development hereby approved
under Condition 9 above, shall be carried out simultaneously with the
development, or each phase thereof as agreed appropriate, and shall be
completed and thereafter maintained and replaced where necessary to the
satisfaction of the Council as Planning Authority.   
Reason:  In the interests of amenity. 
11. That before any work commences on site, a maintenance and management
scheme shall be submitted to and approved by the Council as Planning
Authority and it shall include proposals for the continuing care, maintenance
and protection of:- 
(a) the proposed footpaths;
(b) the proposed parking areas;
(c) the proposed grassed, planted and landscaped areas as approved under
the terms of Condition 9 above; and
(d) the proposed boundary treatment.   
Reason:  To safeguard the amenity of the area. 
12. For the avoidance of doubt, no consent is granted for the physical sub-division
of any part of the courtyard within Orchard Farm, and at all times the courtyard
shall be kept free of walls, fences or other means of boundary definition, all to
the satisfaction of the Council as Planning Authority.   
Reason:  To safeguard the character and appearance of the Listed Building. 
13. That before any development commences on site or before any materials are
ordered or brought to the site, details and samples of all materials to be used
as external finishes on the development shall be submitted to and approved by
the Council as Planning Authority.   
Reason: In the interests of amenity and in order to retain effective planning
control. 
14. That before any work commences on the site, sample panels of all the proposed
wall finishes shall be provided and no further work on the site shall be
commenced until the written approval of the Council as Planning Authority has
been granted for these finishes.  The approved sample panels shall remain in
place throughout construction and be used as a quality template.  For the
avoidance of doubt the sample panels for the natural stone and natural slate
walling shall clearly demonstrate the colour, texture and coursing of the
materials.   
Reason:  To ensure satisfactory integration of the new dwellinghouses with the
designated green belt. 
15. That the roofs of all the dwellinghouses and associated garages and
outbuildings, shall be clad externally in natural slate.   
Reason:  To ensure a satisfactory integration of the proposed development with
the existing building both in terms of design and materials.  
55

Page 56

16. All external colours shall be agreed in writing with the Council as Planning
Authority prior to the commencement of works.   
Reason:  In the interests of amenity and in order to retain effective planning
control. 
17. That before development starts, details of all boundary treatments and their
location shall be submitted to and approved by the Council as Planning
Authority and thereafter all approved works shall be completed to the
satisfaction of the Council prior to the development hereby approved being
occupied or brought into use.   
Reason:  These details have not been submitted or approved. 
18. That notwithstanding the provisions of the Town and Country Planning (General
Permitted Development)(Scotland) Amendment Order 2011 (or any such order
revoking or re-enacting that order), no development shall take place within the
curtilage of the application site other than that expressly authorised by this
permission without the submission of a further planning application to the
Council as Planning Authority.   
Reason:  In the interests of the visual amenity of the area. 
19. That notwithstanding the terms of the Town and Country Planning (General
Permitted Development)(Scotland) Amendment Order 2011 (or any such order
revoking or re-enacting that order), no fences, walls or other means of enclosure
shall be erected on the site other than post and wire fences up to 1 metre in
height or those expressly authorised by this permission without the submission
of a further planning application to the Council as Planning Authority.   
Reason:  In the interests of amenity and in order to retain effective planning
control. 
20. That before any of the dwellinghouses hereby approved are brought into use, a
6 metre wide dropped kerb verge crossing, with the kerb laid to delineate the
edge of the public road and hard surfaced for the first 6 metres behind the edge
of the public road, shall be constructed in accordance with the specification and
to the satisfaction of the Council as Roads and Planning Authority.   
Reason:  In the interest of public safety. 
21. That before any of the dwellinghouses hereby approved are completed or
brought into use, visibility splays of 2.4 metres by 100 metres measured from
the road channel shall be provided on both sides of the vehicular access and
everything exceeding 1.05 metres in height above the road channel level shall
be removed from the sight line areas and thereafter nothing exceeding 1.05
metres in height shall be planted, placed or erected within these sight lines.   
Reason:  In the interest of road safety. 
22. That before any of the dwellinghouses hereby approved are occupied, a
drainage system capable of preventing any flow of water from the site onto the
public road or neighbouring land, or into the site from surrounding land shall be
provided and maintained to the satisfaction of the Council as Roads and
Planning Authority. 
56

Page 57

Reason:  To ensure the provision of a satisfactory drainage system. 
23. That no development shall commence until details of surface water drainage
arrangements have been submitted to and approved in writing by the Council
as Planning Authority; such drainage arrangements will require to comply with
the principles of sustainable urban drainage systems and with the Council's
Developer Design Guidance (May 2020) and shall include the following signed
appendices: C 'Sustainable Drainage Design Compliance certificate', D
'Sustainable Drainage Design Independent Check Certificate' and E
'Confirmation of Future Maintenance of Sustainable Drainage Apparatus'.  The
development shall not be occupied until the surface drainage works have been
completed in accordance with the details submitted to and approved in writing
by the Council as Planning Authority.         
Reason:  To ensure that the disposal of surface water from the site is dealt with
in a safe and sustainable manner, to return it to the natural water cycle with
minimal adverse impact on people and the environment and to alleviate the
potential for on-site and off-site flooding. 
24. Prior to the commencement of works a detailed plan of public access across
the site (existing, during construction and upon completion) shall be provided
for the approval of the Council as Planning Authority. 
For the avoidance of doubt this shall show:- 
a) all existing paths, tracks and rights of way, and any areas currently out
with or excluded from statutory access rights*;
b) any areas proposed for exclusion from statutory access rights, for reasons
of privacy, disturbance or curtilage, in relation to proposed buildings or
structures;
c) all paths and tracks proposed for construction, for use by walkers, riders, 
cyclists, all-abilities users, etc.
d) any diversions of paths - temporary or permanent - proposed for the
purposes of the development.   
* under Part One of the Land Reform (Scotland) Act 2003.   
Reason:  In the interests of satisfactorily maintaining public rights of way.  
25. (a) The applicant shall be required to undertake a comprehensive site
investigation, carried out to the appropriate Phase level, to be submitted to and
approved in writing by the Council as Planning Authority.  The investigation shall
be completed in accordance with the advice given in the following:-  
(i) Planning Advice Note 33 (2000) and Part IIA of the Environmental
Protection Act 1990 (as inserted by section 57 of the Environment Act
1995);
(ii) Contaminated Land Report 11 - 'Model Procedures for the Management
of Land Contamination (CLR 11) - issued by DEFRA and the Environment
Agency;
(iii) BS 10175:2001 - British Standards institution 'The Investigation of
Potentially Contaminated Sites - Code of Practice'.   
57

Page 58

(b) If the Phase 1 investigation indicates any potential pollution linkages, a
Conceptual Site Model must be formulated and these linkages must be
subjected to risk assessment.  If a Phase 2 investigation is required, then a risk
assessment of all relevant pollution linkages using site specific assessment
criteria will require to be submitted.   
(c) If the risk assessment identifies any unacceptable risks, a detailed
remediation strategy will be submitted to and approved in writing by the Council
as Planning Authority.  No works other than investigative works shall be carried
out on site prior to receipt of the Council's written approval of the remediation
plan. 
Reason:  To avoid unacceptable risks to human health and the environment, to
ensure that the land is remediated and made suitable for its proposed use. 
26. (a) Remediation of the site shall be carried out in accordance with the approved
remediation plan prior to the proposed development being brought into use. 
Any amendments to the approved remediation plan shall not be implemented
unless approved in writing by the Council as Planning Authority.   
(b) On completion of the remediation works, the developer shall submit a
completion report to the Council as Planning Authority, confirming that the
works have been carried out in accordance with the approved remediation plan
and that the works have successfully reduced these risks to acceptable levels. 
(c) Any previously unsuspected contamination which becomes evident during
the development of the site shall be brought to the attention of the Council as
Planning Authority within one week or earlier of it being identified.  A more
detailed site investigation to determine the extent and nature of the
contaminant(s) and a site-specific risk assessment of any associated pollutant
linkages, shall then require to be submitted to and approved in writing by the
Council as Planning Authority.   
Reason:  To avoid unacceptable risks to human health and the environment, to
ensure that the land is remediated and made suitable for its proposed use.  
27. No development shall commence at Plot 3 until:- 
a) a scheme of intrusive investigations has been carried out on site to 
establish the risks posed to the development by past coal mining activity;
and 
b) any remediation works and/or mitigation measures to address land 
instability arising from coal mining legacy, as may be necessary, have 
been implemented on site in full in order to ensure that the site is made 
safe and stable for the development proposed.     
The intrusive site investigations and remedial works shall be carried out in
accordance with authoritative UK guidance.   
Reason:  To ensure safe development and mitigate against ground instability
on site for the lifetime of the development.  
58

Page 59

28. Prior to the occupation of the dwelling house at Plot 3, a signed statement or
declaration prepared by a suitably competent person confirming that the site is,
or has been made, safe and stable for the approved development shall be
submitted to the Local Planning Authority for approval in writing.  This document
shall confirm the methods and findings of the intrusive site investigations and
the completion of any remedial works and/or mitigation necessary to address
the risks posed by past coal mining activity.       
Reason:  To ensure safe development and mitigate against ground instability
on site for the lifetime of the development. 
29. Prior to the commencement of development on site, details of the Sustainable
Urban Drainage System (SUDS) and its maintenance following installation shall
be submitted to and approved by the Planning Authority.  The SUDS shall be
designed to ensure that contaminants present on the site are not mobilised and
that pollution pathways are not created.  The Sustainable Urban Drainage
System shall thereafter be formed and maintained on site in accordance with
the approved details.   
Reason:  To ensure that no contaminated material leaves the site untreated in
order to protect public health, the water environment and to ensure that the site
is fit for its intended use. 
30. That the dwellinghouses shall not be occupied until the developer provides a
written agreement from Scottish Water and SEPA that the site can be served
by a water supply and sewerage scheme in accordance with relevant standards
and regulations.     
Reason:  To ensure that the development is served by an appropriate effluent
disposal system and water supply. 
31. Prior to the commencement of development on site, an energy statement
covering the new build element of the approved development which
demonstrates that on-site zero and low carbon energy technologies contribute
at least an extra 10% reduction in CO2 emissions beyond the 2007 building
regulations carbon dioxide emissions standard, shall be submitted to and
approved in writing by the Council as Planning Authority.  The statement shall
include:-       
a) the total predicted energy requirements and CO2 emissions of the
development, clearly illustrating the additional 10% reduction beyond the
2007 building regulations CO2 standard; 
b) a schedule of proposed on-site zero and low carbon energy technologies to
be included in the development and their respective energy contributions
and carbon savings;       
c) an indication of the location and design of the on-site energy technologies;
and       
d) a maintenance programme for the on-site zero and low carbon energy
technologies to be incorporated.       
Reason:  To secure a reduction in carbon dioxide emissions.  
59

Page 60

32. The approved on-site zero and low carbon energy technologies shall be fully
installed and operational prior to the occupation of any approved buildings and
shall thereafter be maintained and shall remain fully operational in accordance
with the approved maintenance programme, unless otherwise agreed in writing
by the Council as Planning Authority. 
Reason:  To secure the timeous implementation of on-site zero and low carbon
energy technologies. 
33. Prior to commencement of the development hereby approved, details of
measures to facilitate the provision of full fibre broadband to serve the
development, including details of appropriate digital infrastructure and a
timescale for implementation, shall be submitted to and approved in writing by
the Council as Planning Authority, unless otherwise agreed in writing with the
applicant.  The approved measures shall thereafter be carried out in
accordance with the agreed implementation timescale.     
Reason: To ensure the provision of digital infrastructure to serve the
development. 
34. That prior to the commencement of works, details and locations of charging
points for electrical cars, at a rate of one charging point per house plot, shall be
submitted for the written approval of the Council as Planning Authority.  Prior to
the completion of the development the approved charging points shall be
installed and available for use.     
Reason:  To ensure facilities for recharging electrical cars are available for the
use of the residents. 
35 The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice. 
Reason:  To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
12. Reason for Decision
12.1. The proposal will not adversely impact on visual amenity, landscape quality, raises no
road safety concerns, conserves an important B-Listed Building and the application
site is self-contained.  In addition, the proposal meets the 3 tests for the renewal of
planning applications and accords with Policies 1, 2, 3, 4, 7, 8, 14 and 15 of National
Planning Framework 4 and Policies 2, 4, 5, 14, GBRA1, GBRA4, DM8, NHE3 and
NHE16 of the South Lanarkshire Local Development Plan 2. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 28 August 2023 
Background Papers
Further information relating to the application can be found online:-
P/22/0345 | Change of use of farm steading to form two dwellings, restoration of farmhouse to form
one dwelling, erection of three dwelling houses and associated access improvements (renewal of
planning application P/18/0374) | Orchard Farm Waygateshaw Road Carluke
(southlanarkshire.gov.uk)  
60

Page 61

Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
61

Page 62

62

Page 63

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/22/1646
Proposal:  Erection of 7 wind turbines with associated infrastructure,
meteorological mast to 105m - Section 42 application to vary
condition 12 (operational lifetime), condition 23 (restoration period)
and conditions 11, 13, 15, 17 and 19 (vary timing of information
submission) of application P/19/1803 
Site Address:  Priestgill Wind Farm
Little Gill Farm
Abington
ML12 6RW 
Applicant:  Priestgill Wind Farm Ltd 
Agent:  Muirhall Energy
Ward:  03 – Clydesdale East
Application Type:  Modification, Variation or Removal of Planning Conditions 
Advert Type:  Environmental Impact Assessment (EIA) Report : Lanark Gazette 18
January 2023
EIA Report : Edinburgh Gazette 20 January 2023
Non-notification of neighbours: Lanark Gazette 18 January 2023 
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant subject to the conclusion of a Legal Agreement
Legal Agreement:  The Committee should note that the decision notice should not be
issued until the following matters are concluded:- 
A Legal Agreement securing:- 
• Community contributions per megawatt generated
• The setting up of a Habitat Management Group
• The repair of roads and bridges arising from extraordinary
wear and tear associated with the development and
associated indemnity insurance requirements
6
63

Page 64

Direction to
Scottish Ministers 
Not Required 
64

Page 65

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
5.1 of the Decision-Making Process 2015 as it constitutes a major planning application. 
2. Site Description
2.1. The application site is located within the rural area approximately 2.2km north east of
the village of Abington and 3.6km to the north of Crawford and extends to
approximately 304 hectares (ha) in area.  The most recent use of the application site
has been upland grazing.     
3. Description of Proposed Development
3.1. The application is made under Section 42 of the Town and Country Planning
(Scotland) Act 1997 as the applicant wishes to vary a number of conditions attached
to a previous application, ref: P/19/1803, (hereon referred to as the original
permission), which granted planning permission for 7 turbines on the site, at a
maximum tip height of 200 metres.  Changes to conditions 11, 12, 13, 15, 17, 19 and
21 of that consent are now proposed and in summary this seeks to extend the
operational lifetime of the Wind Farm from 25 to 40 years, to extend the period for
decommissioning from 2 to 3 years, and to vary the timetable for the submission of
supporting information. 
3.2 Paragraphs 3.4 to 3.10 below set out in detail the variations that are sought to the
wording of conditions and this is marked in italics. 
3.3 Condition 11 of the original permission states:- 
Prior to development commencing on site, details of siting, design and appearance of
the monitoring mast, substation and any other site compounds shall be submitted to
and approved in writing by the Planning Authority.  This will include details of the
materials, external finishes and colours of battery storage, substation and for all
ancillary elements (including access tracks, transformers, switchgear/metering
building, compound, boundary treatment and fencing).  If required by the Planning
Authority, samples of materials shall be provided and only materials approved by the
Planning Authority shall be used.  Thereafter, the development shall be carried out in
accordance with the approved details. 
The applicant has requested that condition 11 be varied to read:- 
Prior to construction of the monitoring mast, substation and any other site compounds,
the details of siting, designs and appearance of each shall be submitted to and
approved in writing by the Planning Authority.  This will include details of the materials,
external finishes and colours of battery storage, substation and for all ancillary
elements (including access tracks, transformers, switchgear/metering building,
compound, boundary treatment and fencing).  If required by the Planning Authority,
samples of materials shall be provided and only materials approved by the Planning
Authority shall be used.  Thereafter, the development shall be carried out in
accordance with the approved details. 
3.4 Condition 12 of the original permission states:- 
Consent is granted for the wind farm and its associated infrastructure for a period from
the date of this consent until 25 years from the date of final commissioning of the
development.  Written confirmation of the date of first commissioning shall be provided
to the Planning Authority no later than one calendar month after that date.  
65

Page 66

The applicant has requested that condition 12 be varied to read:- 
Consent is granted for the wind farm and its associated infrastructure for a period from
the date of this consent until 40 years from the date of final commissioning of the
development.  Written confirmation of the date of final commissioning shall be provided
to the Planning Authority no later than one calendar month after that date. 
3.5 Condition 13 of the original permission states:- 
There shall be no commencement of development until a scheme for the avoidance
or mitigation of any shadow flicker experienced by residential and commercial
properties situated within 10 rotor diameters of any turbine forming part of the
development and which lawfully exist or for which planning permission has been
granted at the date of this consent has been submitted to and approved in writing by
the Planning Authority.  The approved mitigation scheme shall thereafter be
implemented in full. 
The applicant has requested that condition 13 be varied to read:- 
Prior to the installation of any turbines, a scheme for the avoidance or mitigation of any
shadow flicker experienced by residential and commercial properties situated within
10 rotor diameters of any turbine forming part of the development and which lawfully
exist or for which planning permission has been granted at the date of this consent,
shall be submitted to and approved in writing by the Planning Authority.  The approved
mitigation scheme shall thereafter be implemented in full. 
3.6 Condition 15 of the original permission states:- 
Within 3 months of commissioning the approved wind farm the applicant shall submit
to the Planning Authority an ‘as built plan’ at an appropriate scale indicating the
location of any track, turbine, crane pad and restored borrow pit within the
development. 
The applicant has requested that condition 15 be varied to read:- 
Within 3 months of final commissioning of the approved wind farm the applicant shall
submit to the Planning Authority an ‘as built plan’ at an appropriate scale indicating the
location of any track, turbine, crane pad and restored borrow pit within the
development. 
3.7 Condition 17 of the original permission states:- 
That before any work starts on site, details of all turbine aviation lighting shall be
submitted for the written approval of the Council, as Planning Authority.  Once
approved be implemented and maintained as such for the lifetime of the development,
hereby approved. 
The applicant has requested that condition 17 be varied to read:- 
Prior to the erection of any turbines or meteorological mast on the site, details of
aviation safety lighting to be installed on any turbine or meteorological mast to be
erected shall be submitted for the written approval of the Council, as Planning
Authority.  Once approved, the details shall be implemented, and maintained as such,
for the lifetime of the development hereby approved.  
66

Page 67

3.8 Condition 19 of the original permission states:- 
No development shall commence unless precise details including the type,
dimensions, colour, and external finish of the proposed turbines have been submitted
to and approved in writing by the Planning Authority.  The height of the turbines hereby
granted planning permission shall not exceed 200 metres to tip above ground level. 
Thereafter, the turbines shall be installed in accordance with the details as approved. 
The applicant has requested that condition 19 be varied to read:- 
Prior to the erection of any turbines, precise details including the type, dimensions,
colour, and external finish of the proposed turbines shall be submitted to and approved
in writing by the Planning Authority.  The height of the turbines hereby granted planning
permission shall not exceed 200 metres to tip above ground level.  Thereafter, the
turbines shall be installed in accordance with the details as approved. 
3.9 Condition 23 of the original permission states:- 
The decommissioning and restoration of the site shall be completed within 2 years
from the date on which the development ceases to generate electricity unless
otherwise agreed in writing with the Planning Authority. 
The applicant has requested that condition 23 be varied to read:- 
The decommissioning and restoration of the site shall be completed within 3 years
from the date on which the development ceases to generate electricity unless
otherwise agreed in writing with the Planning Authority. 
3.10 In essence, this application requests an extension to the operating period of the wind
farm from 25 years to 40 years, and a change from 2 years to 3 years to decommission
and restore the site, together with varying the timetable to submit further information
required to discharge various conditions.       
3.11 If successful, the effect of a Section 42 application to modify a planning condition or
conditions is to grant a further planning permission for the whole development but with
the amended condition or conditions replacing those that were previously issued, or
with conditions removed if required. 
3.12 All other conditions, if relevant, are also required to be attached to any new planning
permission.  If the proposed changes to the condition or conditions are deemed
unacceptable, then Section 42 of the Act requires the application to be refused.  Any
refusal of an application under Section 42 of the Act does not have any effect on the
original planning permission which remains intact. 
4. Relevant Planning History
4.1. Planning application ref: CL/17/0009 for the erection of 7 wind turbines with a
maximum tip height of 145m and associated infrastructure including access tracks,
substation buildings and battery storage was refused by the Planning Committee on
15 August 2017.  Following an appeal against the decision to the Planning and
Environmental Appeals Division (DPEA) the appointed Reporter upheld the appeal
and granted planning permission. 
67

Page 68

4.2 A subsequent Section 42 application, ref: P/19/1803 was submitted in 2019, seeking
to increase the overall height of 5 of the approved turbines to 200 metres (blade tip
height), and to increase 2 turbines to 180 metres (blade tip height).  This application
was granted planning permission at Planning Committee on 1 December 2020.  This
consent was subject to a section 75 agreement to secure the formation of a Habitat
Management Group, ensure the repair of any damage to roads and bridges arising
from extraordinary wear and tear associated with the development and community
benefit contributions to offset some of the impacts caused by wind farm development. 
5. Supporting Information 
5.1. The applicant has submitted a number of supporting documents with the application,
including a Section 42 Supporting Statement setting out the justification for the
application, and a number of the original submitted EIA documents and figures.   
6. Consultations
6.1. The Ministry of Defence (MOD) – originally advised that whilst they have no objection
to the amended wording of condition 12 to extend the operational lifetime of the wind
farm, they do object to the amended wording proposed by the applicant for condition
17: Details of aviation safety lighting to be installed.  This was because it only proposed
that the lighting details be submitted and approved for the proposed turbines on the
site and did not mention or take into account the proposed 105 metre-high
meteorological mast also approved on the site.  Following a number of discussions
between the applicant, the MOD and the Planning Service, the MOD has now
confirmed that the further amended wording of condition 17, reflecting their most
recent proposed wording, is acceptable, and that they no longer object to the current
application.
Response:  Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, no
representations have been received.   
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation
 Policy 3 - Biodiversity
 Policy 4 - Natural places
 Policy 5 - Soils
 Policy 11 - Energy
 Policy 29 - Rural development 
8.3. South Lanarkshire Local Development Plan 2 (2021) 
The application site and associated proposals are affected by the following policies
contained in the South Lanarkshire Local Development Plan 2 (SLLDP2):-
68

Page 69

SLLDP2 Volume 1 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
 Policy 14 - Natural and Historic Development
 Policy 15 - Travel and Transport
 Policy 18 - Renewable Energy 
South Lanarkshire Council (SLC) Supporting Planning Guidance
 Renewable Energy (January 2021) 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  The policies contained within National
Planning Framework 4 and the South Lanarkshire Local Development Plan 2 are the
main consideration in this case, together with an assessment of any other material
planning considerations. 
10.2 As the proposals involve an amendment to an existing live consent, there is no
opportunity for the Planning Authority to revisit the principle of the development, or any
facets of the Original Consent that do not form part of the proposed amendments. 
Therefore, in this instance, the assessment of the proposals relate solely to
consideration of any impacts that may arise from an increase in the permitted period
of operation from 25 to 40 years; an increase in time for decommissioning/restoration;
and the timing of the submission of required information.  The main matters for the
Council’s consideration are therefore whether these alterations to timescales would
continue to comply with the Development Plan.  No changes to the scale, design or
layout of the previously approved scheme are proposed. 
10.3 In determining whether the proposed 15 year extension to the operation of the wind
farm is acceptable, it should be noted that the 25 year time limit on the original
permission was not imposed to mitigate any effects of the wind turbines on the
surrounding area, but rather reflected the ‘industry standard’ at the time, in that the
operational capacity of turbines was limited by the technology then in place.   
10.4 However, as technology has advanced and wind farms become an established
feature, developers have sought to extend their operational time limits.  Overall, there
is a general presumption in favour of granting permission in such cases, unless
exceptional circumstances suggest otherwise.  In this instance, the policy direction on
wind farm development is broadly identical to when the original permission was
granted, and it is considered that the environmental impact of the proposals remains
unchanged.  In addition, the application, if successful, would result in an additional 15
years of renewable electricity generation for an already consented/operational wind
farm which accords with policy direction at both a national and a local level.  This
aspect of the application is therefore acceptable. 
69

Page 70

10.5 Condition 23 currently requires the decommissioning and restoration of the site to be
completed within 2 years from the date on which the development ceases to generate
electricity.  The proposal to extend this period by a further year does not raise
concerns.
10.6 Finally, it is considered that the small changes to the wording of conditions 11, 13, 15,
17 and 19 are also acceptable.
10.7 Conclusion 
In conclusion, it is considered that subject to the replication and amendment of the
various conditions attached to the original 2019 Section 42 permission, the proposals
are acceptable.  It is, therefore, recommended that the Planning Committee approve
the application. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant consent subject to the conditions listed below and the conclusion of a
legal agreement to secure the following:- 
⧫ Community contributions per megawatt generated
⧫ The setting up of a Habitat Management Group
⧫ The repair of roads and bridges arising from extraordinary wear and tear
associated with the development and associated indemnity insurance
requirements 
The applicant will be responsible for meeting the Council’s reasonably incurred legal
expenses in respect of the legal agreement and restoration guarantee quantum. 
In accordance with agreed procedure, should there be no significant progress, on
behalf of the applicant, towards the conclusion of the Legal Agreement within 6 months
of the date of the Committee, the proposed development may be refused on the basis
that, without the planning control/developer contribution which would be secured by
the Legal Agreement, the proposed development would be unacceptable. 
If, however, this matter is being progressed satisfactorily the applicant will be offered
the opportunity to enter into a Processing Agreement, if this is not already in place. 
This will set an alternative agreed timescale for the conclusion of the Legal Agreement. 
If granted the planning permission shall not be released until the Legal Agreement has
been concluded. 
Conditions 
01. The development shall be carried out strictly in accordance with the terms of all
volumes of the Document titled Priestgill Wind Farm dated November 2019, including
all mitigation and monitoring measures stated in it, subject to any requirements set out
in these conditions.  Any proposed deviation from the detail provided within these
documents, must be submitted to and approved in writing by the Planning Authority
before the works described therein are undertaken.   
Reason:  To ensure that the development is carried out in accordance with the
approved details.  
70

Page 71

02. The applicant shall ensure that all works carried out on site must be carried out in
accordance with the current BS5228, 'Noise control on construction and open sites'. 
The applicant shall further ensure that audible construction activities shall be limited
to, Monday to Friday 08.00 to 19:00, Saturday 08.00 to 13.00, and with no audible
activity taking place on Sunday, and local and national bank holidays without prior
written approval of the Planning Authority.  HGV movements to and from the site
(excluding abnormal loads) during construction of the wind farm shall be limited to
08.00 to 19.00, Saturday 08.00 to 13.00, with no HGV movements to or from site taking
place on a Sunday or on national public holidays.  Under exceptional conditions the
above time restrictions may be further varied subject to written agreement with the
Planning Authority.   
Reason: In the interests of controlling construction noise. 
03. No fixed or mobile plant used within the site during the construction period shall
incorporate bleeping type warning devices that are audible at any noise sensitive
receptor.  Details of alternative warning devices shall be submitted to and approved in
writing by the Planning Authority prior to development starting on site.  Efficient
silencers shall be fitted to, used and maintained in accordance with manufacturers'
instructions on all vehicles, plant and machinery used on the development site.   
Reason:  In the interests of controlling construction noise. 
04. No development shall commence unless a Traffic Management Plan (TMP) has been
submitted to and approved by the Planning Authority, in consultation with the Roads
Authority and Transport Scotland.  The TMP shall include:- 
a) details of the transportation and delivery route(s) for wind turbine and construction
traffic; 
b) details of the timings, volumes and types of vehicles; 
c) details of any alteration to the public road network, including all temporary works
and 
relocation of street furniture; 
d) detailed plans and specifications for access arrangements to the A702 and
visibility splays associated with them; 
e) arrangements for emergency vehicle access; 
f) details of proposed signage during the construction period; 
g) any necessary mitigation; and 
h) a travel plan. 
Thereafter, the development shall be carried out in accordance with the TMP, unless
agreed otherwise in writing with the Planning Authority.   
Reason: In the interests of road safety. 
05. At least 3 months prior to the delivery of abnormal loads the developer will undertake
an Abnormal Load Route Assessment (ALRA) which shall include a swept path
assessment of the route and proposals for a trial run of abnormal load deliveries, and
submit details of their report together with any recommendations for the written
approval of the Council as Roads Authority and in consultation with Transport
Scotland.  The ALRA shall include details of a public relation strategy to inform the
relevant communities of the programme of abnormal deliveries and confirmation from
Transport Scotland that it is acceptable if their land is encroached by abnormal loads
along the approved route.  The recommendations shall thereafter be implemented in
accordance with a programme to be approved by the Planning Authority and shall be
71

Page 72

implemented prior to the delivery of the abnormal loads.  Should the abnormal load
route include any bridge crossings, prior to the commencement of the development
clarification on the Bridge Assessments require to be submitted to and approved by
the Planning Authority.   
Reason:  In the interests of road safety. 
06. Prior to commencement of construction works a full Safety Audit for all infrastructure
to be constructed and adopted, or altered, on the public road, undertaken in
accordance with the Institute of Highways and Transportation Guidelines, shall be
submitted to and approved by the Planning Authority.   
Reason:  In the interests of road safety. 
07. No development shall commence unless a Construction and Environment
Management Plan (CEMP) including a Construction Method Statement, has been
submitted to and approved by the Planning Authority in consultation with the Scottish
Environment Protection Agency (SEPA).  The Statement/s shall integrate "good
practice" methods from the Scottish/UK wind farm industry and incorporate the
mitigation measures identified in the Environmental Impact Assessment Report.  The
CEMP shall include the following matters:- 
a) details of ecological pre-construction surveys of all areas of construction and a
suitable buffer that will be undertaken no more than three months prior to
commencement of development and, if necessary, the relevant disturbance licenses
from Scottish Natural Heritage (SNH) will be applied for prior to construction
commencing; 
b) Protected Species Protection Plan covering the monitoring of any known protected
species, resting sites and also include details of how any reptiles that may be present
on the site during construction will be protected; 
c) water quality monitoring programme which will include monitoring of watercourses
and their water quality to be completed on a monthly basis with extractive samples
sent for laboratory analysis to ensure construction of the development is not
detrimentally effecting water quality; 
d) details of basic ecological constraints training to be provided by the Environmental
Clerk of Works to raise awareness to all construction staff of specific ecological issues
through the site induction and toolbox talks as part of a wider site induction; 
e) Breeding Bird Protection Plan 
f) a Site Waste Management Plan; 
g) a Pollution Prevention Plan; 
h) details of on-site storage of materials, including fuel and other chemicals; 
i) details of on-site storage and off-site disposal of excavated material where required; 
j) details of the methodology for reuse of the small amounts of peat in the re-turfing of
the verges; if greater volumes of peat are encountered, a Peat Management Plan shall
be prepared; 
k) a Sustainable Drainage System (SuDS) design concept including run-off and
sediment control measures; 
l) a Flood Risk Assessment with recommendations and mitigation measures where
required; 
m) details and timetable for phasing of construction works; 
n) details of all internal access tracks, including accesses from the public road and
hardstanding areas; 
o) details of borrow pit excavation and restoration including the need to carry out any
blasting;  
72

Page 73

p) details of proposed temporary site compound for storage of materials, machinery,
and designated car parking; 
q) cleaning of site entrance, site tracks and the adjacent public road and the sheeting
of all HGVs taking spoil or construction materials to/from the site to prevent spillage or
deposit of any materials on the public road; 
r) details and timetable for post construction restoration and/or reinstatement of the
working areas and any other temporary works; and 
s) the development site shall not be illuminated by lighting unless the Planning
Authority has given prior written approval or lighting is required during working hours
which have been approved by the Planning Authority; or an emergency requires the
provision of lighting. 
Thereafter, the construction of the development shall be carried out in complete
accordance with the approved CEMP, unless otherwise agreed in writing with the
Planning Authority.   
Reason:  To ensure that all construction operations are carried out in a manner that
minimises their impact on amenity and the environment, and that the mitigation
measures contained in the Environmental Statement accompanying the application,
or as otherwise agreed, are fully implemented. 
08. There shall be no Commencement of Development unless the Planning Authority has
approved in writing the terms of appointment by the Company of an independent
Ecological Clerk of Works (ECoW).  The terms of the appointment shall include the
ECoW to be appointed prior to commencement of development, remaining appointed
until the final commissioning of the development.  The scope of work of the ECoW
shall include:- 
a) monitoring compliance with the ecological mitigation works that have been approved
in this consent, including the mitigation measures identified in the Environmental
Impact Assessment Report dated November 2019; 
b) advising the developer on adequate protection of nature conservation interests on
the site; 
c) directing the micro siting and placement of the turbines, bridges, compounds and
tracks; and 
d) monitoring compliance with the Construction Environmental Management Plan of 
condition 7.   
Reason:  To secure effective monitoring compliance with the environmental mitigation
and management measures associated with the development. 
09. Prior to the commencement of decommissioning, an Ecological Clerk of Works
(ECoW) shall be appointed by the developer and approved by the Planning Authority
after consultation with SNH until the completion of aftercare or such earlier date as
may be agreed in writing by the Planning Authority.  The scope of work of the ECoW
shall include those elements identified in condition 8 with the exception of points c)
and d) of that condition and will include monitoring compliance with the
Decommissioning, Restoration and Aftercare Plan required by condition 23.   
Reason:  To secure effective monitoring compliance with the environmental mitigation
and management measures associated with the development.  
73

Page 74

10. No development shall take place within the development site as outlined in red on the
approved site plan until the developer has secured the implementation of a programme
of archaeological works in accordance with a written scheme of investigation which
has been submitted by the applicant, approved by the Planning Authority in
consultation with the West of Scotland Archaeology Service.  Thereafter the developer
shall ensure that the programme of archaeological works is fully implemented and that
all recording and recovery of archaeological resources within the development site is
undertaken to the satisfaction of the Planning Authority in consultation with the West
of Scotland Archaeology Service.   
Reason:  In order to safeguard the archaeological heritage of the site and to ensure
that the developer provides for an adequate opportunity to investigate, record and
rescue archaeological remains on the site, which lies within an area of potential
archaeological importance. 
11. Prior to construction of the monitoring mast, substation and any other site compounds,
the details of siting, designs and appearance of each shall be submitted to and
approved in writing by the Planning Authority.  This will include details of the materials,
external finishes and colours of battery storage, substation and for all ancillary
elements (including access tracks, transformers, switchgear/metering building,
compound, boundary treatment and fencing).  If required by the Planning Authority,
samples of materials shall be provided and only materials approved by the Planning
Authority shall be used.  Thereafter, the development shall be carried out in
accordance with the approved details.   
Reason:  In the interests of the visual amenity of the area. 
12. Consent is granted for the wind farm and its associated infrastructure for a period from
the date of this consent until 40 years from the date of final commissioning of the
development.  Written confirmation of the date of final commissioning shall be provided
to the Planning Authority no later than one calendar month after that date.   
Reason:  In order to retain effective planning control. 
13. Prior to the installation of any turbines, a scheme for the avoidance or mitigation of any
shadow flicker experienced by residential and commercial properties situated within
10 rotor diameters of any turbine forming part of the development and which lawfully
exist or for which planning permission has been granted at the date of this consent,
shall be submitted to and approved in writing by the Planning Authority.  The approved
mitigation scheme shall thereafter be implemented in full.   
Reason:  To offset impacts of shadow flicker on residential and commercial property
amenity. 
14. Each turbine shall be erected in the position indicated in the co-ordinates within the
Environmental Impact Assessment Report November 2019.  A variation of the
indicated position of any turbine or other development infrastructure detailed on the
approved drawing shall be notified on the following basis: (a) if the variation is less
than 50 metres it shall only be permitted following the approval of the Ecological Clerk
of Works (ECoW) in consultation with SEPA and West of Scotland Archaeology
Service, (b) if the variation is of between 50 metres and 100 metres it shall only be
permitted following written approval of the Planning Authority in consultation with
SEPA and West of Scotland Archaeology Service.  The said provisions relating to
variation shall not have the effect such that any variation will:-  
74

Page 75

- bring a turbine outwith the planning application boundary, or   
- breach the 20m water buffer zones 
without the prior written agreement of the Planning Authority.   
Reason:  In the interests of amenity and in order to retain effective planning control. 
15. Within 3 months of final commissioning of the approved wind farm the applicant shall
submit to the Planning Authority an 'as built plan' at an appropriate scale, indicating
the location of any track, turbine, crane pad and restored borrow pit within the
development.   
Reason:  In order to retain effective planning control. 
16. No part of any turbine shall be erected above ground unless:- 
a) a Primary Radar Mitigation Scheme agreed with the Operator has been submitted
to and approved in writing by the Planning Authority; and 
b) the approved Primary Radar Mitigation Scheme has been implemented. 
The development shall thereafter be operated fully in accordance with such approved
Scheme. 
For the purpose of the condition above:- 
"Operator" means NATS (En Route) plc, incorporated under the Companies Act
(4129273) whose registered office is 4000 Parkway, Whiteley, Fareham, Hants PO15
7FL or such other organisation licensed from time to time under sections 5 and 6 of
the Transport Act 2000 to provide air traffic services to the relevant managed area
(within the meaning of section 40 of that Act). "Primary Radar Mitigation Scheme" or
"Scheme" means a detailed scheme agreed with the Operator which sets out the
measures to be taken to avoid at all times the impact of the development on the
Lowther Hill primary radar and air traffic management operations of the Operator.   
Reason:  In the interests of aviation safety and in order to avoid the impact of the
development on the Primary Radar of the Operator located at Lowther Hill and
associated air traffic management operations. 
17. Prior to the erection of any turbines or meteorological mast on the site, details of
aviation safety lighting to be installed on any turbine or meteorological mast to be
erected shall be submitted for the written approval of the Council, as Planning
Authority.  Once approved, the details shall be implemented, and maintained as such,
for the lifetime of the development hereby approved.   
Reason:  In the interests of aviation safety. 
18. The blades on all the turbines hereby approved shall rotate in the same direction.   
Reason:  In the interests of the visual amenity of the area.  
75

Page 76

19. Prior to the erection of any turbines, precise details including the type, dimensions,
colour, and external finish of the proposed turbines shall be submitted to and approved
in writing by the Planning Authority.  The height of the turbines hereby granted planning
permission shall not exceed 200 metres to tip above ground level.  Thereafter, the
turbines shall be installed in accordance with the details as approved.   
Reason:  In the interests of the visual amenity of the area. 
20. Only mechanical means of snow clearance shall be used to clear access tracks, unless
otherwise agreed in writing by the Planning Authority.   
Reason:  To minimise the environmental impact of snow clearing operations by
avoiding the use of chemicals or salt without explicit approval. 
21. There shall be no Commencement of Development unless a decommissioning,
restoration and aftercare strategy has been submitted to and approved in writing by
the Planning Authority.  The scheme shall detail measures for the decommissioning of
the development, restoration and aftercare of the site and will include, without
limitation, proposals for the removal of the above ground elements of the development,
the treatment of ground surfaces, the management and timing of the works, and
environmental management provision.   
Reason:  To ensure the decommissioning and removal of the development in an
appropriate and environmentally acceptable manner and the restoration and aftercare
of the site, in the interests of safety, amenity and environmental protection. 
22. No later than 3 years prior to decommissioning of the development or the expiration of
this consent (whichever is the earlier) a detailed decommissioning, restoration and
aftercare plan, based upon the principles of the approved decommissioning,
restoration and aftercare strategy, shall be submitted to the Planning Authority for
written approval in consultation with SNH and SEPA.  The detailed decommissioning,
restoration and aftercare plan will provide updated and detailed proposals for removal
of above ground elements of the development, the treatment of ground surfaces, the
management and timing of the works and environment management provisions.  The
development shall be decommissioned, site restored, and aftercare thereafter
undertaken in accordance with the approved plan, unless otherwise agreed in writing
in advance with the Planning Authority.   
Reason:  To ensure the decommissioning and removal of the development in an
appropriate and environmentally acceptable manner and the restoration and aftercare
of the site, in the interests of safety, amenity and environmental protection. 
23. The decommissioning and restoration of the site shall be completed within 3 years
from the date on which the development ceases to generate electricity, unless
otherwise agreed in writing with the Planning Authority.   
Reason:  In the interests of safety, amenity and environmental protection. 
24. No development shall commence until the developer puts in place a Private Water
Supply Protection Plan, covering the period from the Commencement of the
Development until 12 months after date of Final Commissioning.  The Plan will be
submitted to and approved in writing by the Planning Authority.  The approved
mitigation scheme shall thereafter be implemented in full.  The Plan shall include
details of monitoring and contingency measures to be delivered to maintain the quality
76

Page 77

and continuity of water supplies to properties which are served by private water
supplies at the date of this consent and include:- 
a) details of the water quality sampling methodology and locations; 
b) details of site investigation to establish the route of the Wandel private water supply
pipe; 
c) measures for protection of the pipe if it is found to pass across the proposed access
track, or within the 10 metre up-gradient and down-gradient; and 
d) measures to notify the occupants of properties supplied by the pipe and the
provision of an alternative supply should the water supply be disturbed or effected as
a consequence of construction activities.   
Reason:  To maintain a secure and adequate quality water supply to all properties with
private water supplies which may be affected by the development. 
25. There shall be no Commencement of Development unless a Wandel Public Right of
Way Access Mitigation Plan, covering the period from the Commencement of
Development until the date of Final Commissioning, has been submitted to and
approved in writing by the Planning Authority.  The Plan will relate to the first 200
metres of the Wandel Public Right of Way where the route is shared or parallel to the
wind farm access track.   
Reason:  In the interests of recreational amenity. 
26. Prior to starting on site, a Habitat Management Plan (HMP) shall be prepared and
finalised in consultation with the Council's Local Biodiversity Officer and RSPB and
submitted to the Planning Authority for approval.  The HMP shall be approved prior to
the commencement on site.  The HMP shall include habitat management and
enhancement to benefit breeding curlew within the Border Hills Natural Heritage Zone
(NHZ) and timing and programme of delivery and monitoring.  Thereafter all works
shall be implemented strictly in accordance with the terms of the approved HMP within
the timescales set out in the approved HMP.   
Reason:  To safeguard environmental impacts, ecology, species and habitats, to
ensure development conforms to the environmental statement and supplementary
environmental information and maintain effective planning control. 
27. That no work shall start on site prior to the establishment of a Habitat Management
Group (HMG) to oversee the preparation of the approved Habitat Management Plan. 
The HMG shall include a representative of South Lanarkshire Council and RSPB and
shall have powers to make reasonable changes to the HMP necessary to deliver its
agreed aims.   
Reason:  To safeguard habitat and to ensure development conforms to Environmental
Statement and maintain effective planning control. 
28. If any wind turbine(s) fails to produce an electricity supply to the grid for a continuous
period of 12 months then, unless otherwise agreed in writing by the Planning Authority,
the wind turbine and any associated above ground infrastructure solely required for
that turbine(s) shall be dismantled and removed from the site and the area around the
turbine restored in accordance with a scheme to be submitted to and approved in
writing by the Planning Authority.   
Reason:  To ensure that any redundant wind turbine is removed from site, in the
interests of safety, amenity and environmental protection. 
77

Page 78

29. At least one month prior to the commencement of the development, a guarantee to
cover all site restoration and aftercare liabilities imposed on the expiry of this consent
will be submitted for the written approval of the planning authority.  Such guarantee
must:- 
i. be granted in favour of the planning authority. 
ii. be granted by a bank or other institution which is of sound financial standing and
capable of fulfilling the obligations under the guarantee. 
iii. be for an amount which covers the value of all site restoration and aftercare liabilities
as determined by the planning authority at the commencement of development. 
iv. contain provisions so that all the site restoration and aftercare liabilities as
determined at the commencement of development shall be increased on each fifth
anniversary of the date of this consent. 
v. come into effect on or before the date of commencement of development and expire
no earlier than 24 months after the end of the aftercare period. 
No work shall begin at the site with the exception of Phase 1 felling until (1) written
approval of the Planning Authority has been given to the terms of such guarantee and
(2) thereafter the validly executed guarantee has been delivered to the planning
authority. 
In the event that the guarantee becomes invalid for any reason, no operations will be
carried out on site until a replacement guarantee completed in accordance with the
terms of this condition is lodged with the Planning Authority. 
Reason:  In the interests of amenity and in order to retain effective planning control. 
30. The day time noise emissions (7am to 11pm) from the wind turbines must not exceed
a noise level of 37dB LA90,10min or background LA90,10min +5dB, whichever is the
greater, at the boundary of the curtilage of any noise sensitive premises at all times at
wind speeds of up to 12 metres per second at 10m height as measured within the site. 
This is based on the SLR Environmental Statement - Chapter 10 Noise.   
The night time noise emissions (11pm to 7am) from the wind turbines must not exceed
a noise level of 43dB LA90,10min or background LA90,10min +5dB, whichever is the
greater, at the boundary of the curtilage of any noise sensitive premises at all times at
wind speeds of up to 12 metres per second at 10m height as measured within the site. 
This is based on the SLR Environmental Statement - Chapter 10 Noise.   
Wind Turbine - Tonal Contribution 
Where the tonal noise emitted by the development exceeds the threshold of audibility
by between 2dB and 6.5dB or greater, then the acceptable noise specified in the
(relevant) condition shall be reduced by the penalty level identified within section 28 of
'The Assessment and rating of Noise from Wind Farms - ETSU-R-97. 
Wind Farm - Investigation of Complaints 
At the reasonable request of the Planning Authority and following a complaint to it
relating to noise emissions arising from the operation of the wind farm, the wind farm
operator shall appoint an independent noise consultant, whose appointment shall
require to be approved by the Planning Authority, to measure the level of noise
emission from the wind farm at the property to which the complaint related.  The
measurement and calculation of noise levels shall be undertaken in accordance with
ETSU-R-97 having regard to paragraphs 1 to 3 and 5 to 11 inclusive of the schedule
78

Page 79

on Pages 95 to 97 inclusive, and Supplementary Guidance Notes to the Planning
Obligation pages 99 to 109 of ETSU-R-97.  The Planning Authority shall inform the
wind farm operator whether the noise giving rise to the complaint contains or is likely
to contain a tonal component or an amplitude modulation.   
Where an assessment of any noise impact is, in the opinion of the Planning Authority
acting reasonably, found to be in breach of the noise limits the developer shall carry
out mitigation measures to remediate the breach so caused.  Details of any such
mitigation measures required are to be submitted to the planning authority for prior
approval.  In the event of amplitude modulation being established, the developer shall
implement suitable mitigation consistent with best available technology to the
satisfaction of the Planning Authority.  At this time this would be in keeping with the
Institute of Acoustics, IOA Noise Working Group (Wind Turbine Noise) Final Report, A
Method for Rating Amplitude Modulation in Wind Turbine Noise, 9 August 2016,
Version 1 [Reason: to mitigate excessive noise]   
Noise mitigation   
Pursuant to condition Noise 13 above, where an assessment of any noise impact
which, in the opinion of the Council as Planning Authority acting reasonably, is found
to be in breach of the noise limits described in condition 5 the developer shall carry
out mitigation measures to remediate the breach so caused.  Details of any such
mitigation measures required are to be submitted to the planning authority for prior
approval. 
If the tonal noise emitted by the development exceeds the threshold of audibility by
6.5dB or more, then the acceptable noise specified in Condition 5 shall be reduced by
5dB, always providing that the definition of audibility for the purposes of this condition
shall be as described in 'The Assessment and Rating of Noise from Wind Farms
(ETSU-R-97)'.   
Reason:  In the interests of residential amenity. 
31. That before any work starts on sites, details of the Wandel Roman Camp
Archaeological interpretation programme shall be submitted for the written approval of
the Planning Authority, in consultation with West of Scotland Archaeology Service
(WOSAS).  Once agreed, the programme shall be implemented and maintained as
such for the lifetime of the development, hereby approved.   
Reason:  In the interests of archaeological interpretation. 
32. That no development shall take place until a Wind Farm Specification/Operation
Schedule has first been submitted to and approved in writing by the Council as Local
Planning Authority following written consultation with the Ministry of Defence.  As a
guideline, the Wind Farm Specification/Operation Schedule should, as a minimum,
include:-   
A detailed wind farm schedule (detailed location, technical and dimensional
specifications for each of the wind turbine generators proposed); 
A method statement and schedule for a testing protocol to assess the impact of the
proposed wind turbine generators as well as establish baseline seismic ground
vibration data for the application site; 
Proposals for the test and evaluation of the wind turbines for specific time periods; and 
A specification for a post implementation Wind Farm Output Report (WFOR) that
shows how each wind turbine generator will be in a low impact state/curtailment
79

Page 80

position in order to minimise Seismic Ground Vibration output.  The WFOR shall define
the required low impact state/curtailment position and provide details of the methods
of measuring the impact of the wind farm on the Eskdalemuir Seismic Array and, if
applicable, a means of mitigating or managing that impact.   
Approval will only be provided by the Council where, following consultation with the
MOD, it has been demonstrated that the turbines can be operated fully in accordance
with the agreed Eskdalemuir budget as allocated by MOD, with any freed-up budget
returning to MOD. 
Thereafter the development shall be constructed strictly in accordance with the details
set out in the approved Wind Farm Specification/Operation Schedule. 
Reason:  In order to define the terms of the consent in the interests of the Eskdalemuir
Seismic Array. 
33. Any wind turbine erected as part of this development shall not be permitted at any time
to operate in anything but the low impact state/curtailment position as defined and
agreed through condition 32 above, other than:-   
a. for the purpose of test and evaluation for specific time periods as defined in the
approved Wind Farm Specification/Operation Schedule; or   
b. following the submission and approval in writing of the completed Wind Farm Output
Report (to the specification agreed through the discharge of condition 32 and outlined
in the Wind Farm Specification/Operation Schedule) by the Council as Local Planning
Authority following written consultation with the Ministry of Defence. 
Thereafter, and for the lifetime of the development, the development shall be operated
strictly in accordance with the approved Wind Farm Specification/Operation Schedule. 
Reason:  In order to define the terms of the consent in the interests of the Eskdalemuir
Seismic Array. 
12. Reason for Decision
12.1. The proposals to vary a number of conditions to extend the lifespan of the wind farm
development and to extend the period for decommissioning from 2 to 3 years and to
vary the timing of information submission to assist with the early stages of the
construction programme are considered acceptable, subject to the imposition of the
previous suite of applicable environmental conditions accord with policies 1, 2, 3, 4, 5,
11 and 29 of the National Planning Framework 4, and with policies 1, 2, 4, 5, 14, 15,
and 18 of the adopted South Lanarkshire Local Development Plan 2 and its supporting
planning guidance on Renewable Energy. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 28 August 2023 
80

Page 81

Background Papers
Further information relating to the application can be found online:- 
P/22/1646 | Erection of 7 wind turbines with associated infrastructure, meteorological mast
to 105m (Section 42 application to vary condition 12 (operational lifetime), condition 23
(restoration period) and Conditions 11, 13, 15, 17 and 19 (vary timing of information
submission) of application P/19/1803 | Priestgill Wind Farm Little Gill Farm Abington ML12
6RW 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
81

Page 82

82

Page 83

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 5 September 2023 
Report by: Executive Director (Community and Enterprise
Resources) 
Reference no:  P/23/0071 
Proposal:  Refurbishment and alterations to former student accommodation to
form 26 residential flats with associated parking
Site Address:  2 Barrack Street, Hamilton, ML3 0HZ
Applicant:  C&S Group
Agent:  N/A
Ward:  17 Hamilton North and East
Application Type:  Full Planning Permission
Advert Type:  None
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant subject to conditions
Legal Agreement:  Not required
Direction to
Scottish Ministers 
Not required 
7
83

Page 84

1. Reason for Report
1.1. This application is required to be determined by the Planning Committee within the
context of the approved Planning Application Decision Making Process (2015) as the
proposal is for more than 10 residential units. 
2. Site Description
2.1.   The site extends to approximately 0.2ha and occupies a prominent corner position. 
The site is enclosed by Almada Street and Bothwell Road, two key routes through
Hamilton, and is situated in close proximity to the designated strategic centre of
Hamilton. 
2.2. The site accommodates an existing building with associated parking, which was
purpose built as student accommodation.  The existing building, which was
constructed in the 1990s, is three storeys in height and forms a courtyard setting. 
Vehicular access to the site is via a pend on Barrack Street and parking is provided
within the courtyard area at ground floor level.  The existing building is finished in buff
facing brick, UPVC cladding and concrete roof tiles. 
2.3. The applicant has advised that the site was utilised by the University of the West of
Scotland (UWS) until 2018.  Following the relocation of their campus, the building has
mostly been vacant with only intermittent use by the Salvation Army to provide
homeless accommodation.  The site was sold by UWS in 2022 and currently contains
26 units, each with 6 bedrooms.  The property is designated as a house in multiple
occupation (HMO) use. 
3. Description of Proposed Development
3.1. This is a detailed planning application for the refurbishment and alterations to the
former student accommodation to form 26 residential flats with associated parking. 
The properties would all have 2 bedrooms and a study/office area.  The vehicular
access and pend would be retained, with the parking layout revised to provide 32
parking spaces.  The parking provision would include two accessible spaces and
provide 27 electric vehicle charging points.  In addition, a bike storage area would also
be provided.   
3.2. Externally, there would be minor alterations affecting the appearance of the building. 
This work would include the installation of replacement windows, doors, cladding and
general repair work.   
4. Relevant Planning History
4.1. The application site formed part of a larger development which was granted planning
permission in principle on 13 January 2020, for a ‘mixed use development
incorporating residential dwellings, hotel, office, care home, retail, restaurant/café,
open space and associated works (Planning Permission in Principle)’ (HM/17/0488). 
5. Supporting Information 
5.1. In support of the planning application, the applicant has submitted:- 
 A Roads and Parking Strategy 
6. Consultations
6.1. Environmental Services - no objection to the proposal, subject to the imposition of
advisory notes relating to nuisance and noise. 
Response - Noted. 
84

Page 85

6.2. Roads Development Management Team – no objection to the proposal subject to
conditions relating to the proposed parking layout.  The site is located in close
proximity to local bus stops and train stations and is therefore accessible to public
transport links.  There are parking restrictions in place along Barrack Street and
Almada Street, which will ensure that there is no overspill parking associated with the
development on the surrounding streets.  
Response - Noted.   
7.  Representations
7.1. Following the statutory period of neighbour notification, no representations have been
received. 
8.  Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the Climate and Nature Crises 
 Policy 2 - Climate Mitigation and Adaptation 
 Policy 9 - Brownfield, Vacant and Derelict Land and Buildings
 Policy 13 - Sustainable Transport 
 Policy 14 - Design, Quality and Place
 Policy 15 - Local Living and 20 Minute Neighbourhoods
 Policy 16 - Quality Homes 
8.3 South Lanarkshire Local Development Plan 2 (2021) 
For the purposes of determining planning applications, the Council will assess
proposals against the policies contained within the adopted South Lanarkshire Local
Development Plan 2 (SLLDP2).  In this regard, the application site and associated
proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 5 - Development Management and Placemaking
 Policy 11 - Housing
 Policy 15 - Travel and Transport 
9.  Guidance
9.1. None 
10.  Assessment and Discussion
10.1. Detailed planning permission is sought for the refurbishment and alterations to former
student accommodation to form 26 residential flats with associated parking at 2
Barrack Street, Hamilton.  The determining issues in the consideration of this
application are its compliance with national policy, local development plan policy and
its impact on residential amenity, traffic safety, environmental matters and
infrastructure issues. 
85

Page 86

10.2. Principle of Development 
Policy 16 of NPF4 seeks to encourage, promote, and facilitate the delivery of more
high quality, affordable and sustainable homes, in the right locations.  In addition,
Policy 16 provides support for homes on land allocated for housing in the Local
Development Plan (LDP).  The application site is identified as an allocated housing
site in the LDP and therefore the principle of the use of the existing building for flatted
homes raises no issues within the context of Policy 16 of NPF4. 
10.3. Policy 9 of NPF4 states that proposals for the re-use of existing buildings, including
conversions to other uses, will be supported.  The proposal relates to the sustainable
re-use of an intermittently vacant building to provide residential flats.  Subsequently,
the proposal accords with the provisions of Policy 9 of the NPF4.   
10.4. The site is identified as a part of the larger ‘Development Framework Site’ (University
of West of Scotland Almada Street, Barrack Street, Hamilton) under Policy 1 of the
adopted LDP.  The proposal raises no issues within the context of Policy 1 of the
adopted LDP.   
10.5. Policy 11 of the adopted LDP is also relevant and designates the site as part of the
housing land supply.  Subsequently, the principle of the use of the site to provide
residential accommodation accords with Policy 11 of the LDP.   
10.6 Climate Change 
Policy 1 of NPF4 requires that when considering all development proposals, significant
weight will be given to the global climate and nature crises.  Policy 2 of NPF4 seeks
to minimise and mitigate against the effects of climate change by considering various
criteria, including being sustainably located, the reuse of vacant and derelict land, the
avoidance of flood risk areas, incorporating low and zero carbon generating
technologies, opportunities for active travel routes and trips by public transport and the
provision of electrical vehicle recharging infrastructure.  The proposal relates to a site
in close proximity to established public transport links.  In addition, provision of electric
vehicle recharging infrastructure is proposed.  Therefore, it is considered that the
proposal raises no issues within the context of Policies 1 and 2 of NPF4. 
10.7. Policies 1 and 2 of the adopted LDP encourage sustainable economic growth and
regeneration, a move towards a low carbon economy, the protection of the natural and
historic environment and mitigation against the impacts of climate change.  The
proposal involves the re-development of an existing building, located in close proximity
to the designated strategic centre of Hamilton, and therefore raises no issues within
the context of Policies 1 and 2 of the adopted LDP.   
10.8 Layout, Siting and Design 
Policies 14 and 15 of NPF4 relate to 20 minute neighbourhoods and liveable places. 
Policy 14 sets out that all development should be designed to improve the quality of
an area and be consistent with the six qualities of a successful place: healthy,
pleasant, connected, distinctive, sustainable and adaptable.  Policy 15 establishes that
development proposals should contribute to local living and 20 minute
neighbourhoods. 
10.9. The proposed development site is located within the Hamilton settlement boundary,
within close proximity to the strategic centre which has a wide range of facilities and
services.  The site is considered to be well connected and situated within a sustainable
location which will contribute to minimising emissions.  In addition, the site is
considered to be adaptable as the proposal seeks to ensure the long-term
86

Page 87

reoccupation of an existing building, whilst simultaneously improving the vitality of the
area.  Therefore, it is considered that the proposal raises no issues within the context
of Policies 14 and 15 of NPF4. 
10.10. In terms of the detailed design of the development, Policy 5 of the adopted LDP
generally requires new development to have due regard to the layout, form, design
and local context of the area, and to promote quality and sustainability in its design. 
The proposed design changes relate to minor external alterations which are
acceptable and accord with the provisions of Policy 5 of the adopted LDP. 
10.11 Other Issues 
Policy 13 of NPF4 provides support for development proposals which have links to
local facilities, are accessible via public transport, provide low emission vehicle
charging points, provide cycle parking and take into account the transport needs of
diverse groups, whilst simultaneously reducing the dominance of the car.  The location
of the site and the design of the proposal support sustainable travel and address these
infrastructure requirements, in accordance with the provisions of Policy 13 of NPF4. 
10.12. Policy 15 of the adopted LDP seeks to ensure that development considers, and where
appropriate, mitigates the resulting impacts of traffic growth and encourages
sustainable transport options that take account of the need to provide proper provision
for walking, cycling and public transport.  In this regard, the site is situated at the
junction of two key transport routes through Hamilton, is accessible by public transport
and the development would be well integrated into existing walking and cycling
networks.  In addition, Roads and Transportation Services consider that the proposal
is acceptable in terms of access, parking and road safety issues.  Subsequently, it is
considered that the proposal accords with the provisions of Policy 15 of the LDP. 
10.13 Conclusion 
In conclusion, the proposal relates to the sustainable reuse of an existing building
situated in close proximity to the strategic centre of Hamilton.  The design, layout and
general impact of the development is considered to be acceptable and that the
proposal raises no significant environmental or infrastructure issues.  The proposal is
considered to be acceptable and it is therefore recommended that the application be
granted subject to the conditions listed. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Planning Permission Subject to the following Conditions:- 
1. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice. 
Reason:  To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
2. That before the development is completed or brought into use, all of the parking
spaces and the associated electric vehicle charging points shown in Drawing
ALM-PL-300 Rev C of the approved plans shall be constructed and thereafter
maintained to the specification of the Council as Roads and Planning Authority. 
Reason:  To ensure the provision of adequate parking facilities within the site.  
87

Page 88

12. Reason for Decision
12.1. The proposal raises no amenity, environmental or infrastructure issues and complies
with Policies 1, 2, 9, 13, 14, 15 and 16 of the National Planning Framework 4 and
Policies 1, 2, 5, 11 and 15 of the adopted South Lanarkshire Local Development Plan
2.  There are no other material considerations which would justify the refusal of
planning permission. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 28 August 2023 
Background Papers
Further information relating to the application can be found online:-
P/23/0071 | Refurbishment and alterations to former student accommodation to form 26 residential
flats with associated parking. | 2 Barrack Street Hamilton ML3 0HZ (southlanarkshire.gov.uk) 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
88

Page 89

89

Page 90

90

Page 91

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/23/0301
Proposal:  Erection of 1.5 storey dwellinghouse with associated works
Site Address:  8A Abbeygreen, Lesmahagow, ML11 0DB 
Applicant:  Mr and Mrs B Hood 
Agent:  Axiom Design Services
Ward:  04 Clydesdale South
Application Type:  Full Planning Permission
Advert Type:  Affect setting of a Listed Building – Carluke Gazette 19 July 2023 and
Site Notice 15 May 2023
Development Plan
Compliance: 
Yes
Departures:  None
Recommendation:  Grant subject to conditions
Legal Agreement:  Not required
Direction to
Scottish Ministers 
Not required 
8
91

Page 92

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
4.1 of the Decision-Making Process 2015: any application which has attracted more
than five objections. 
2. Site Description
2.1. The application site relates to an area of land to the rear of the former Royal Bank of
Scotland building at 8 Abbeygreen, Lesmahagow.  The former bank is a Category B-
listed building, with the application site itself comprising of open soft-landscaped
grounds which were formally associated with the bank building. 
2.2. The application site is bound by Bloomfield Road to the south and Wellwood Road to
the west and is separated from the roads by an existing stone boundary wall and by
existing landscaping including a number of mature trees.  The majority of the site is
relatively level and extends to approximately 0.07 hectares.  The site is located on the
edge of the designated local centre, however, most of the adjacent properties are
residential in terms of their current use.   
3. Description of Proposed Development
3.1. The proposal involves the erection of a 1.5 storey dwellinghouse, the formation of a
new vehicular access onto Wellwood Road and the provision of a driveway to the front
and side.  The house would have an H-shaped footprint and a pitched roof.  A small
front dormer is proposed for the centre of the front elevation and a rear two storey
gable featuring a Juliet balcony is proposed serving the main bedroom, with a second
Juliet balcony proposed for the side elevation, serving the other upper floor bedroom. 
The proposed finishing materials include concrete roof tiles, rendered walls with a
stone finish to the central entrance, powder coated windows and uPVC rainwater
goods. 
3.2. Bin storage provision would be to the side of the house with the garden ground beyond
this area also to the side of the house, as well as to the rear.  The existing stone
boundary wall is to be lowered to 900mm along Wellwood Road and Bloomfield Road
to accommodate the access. 
4. Relevant Planning History
4.1. Planning permission in principle was granted for the erection of a dwellinghouse on
the site in 2019 (P/19/0613).  A detailed application for the erection of a dwellinghouse
was submitted in 2020 (P/20/1755) but was later withdrawn by the applicant.  In 2021
detailed consent was approved for the erection of a 1.5 storey dwellinghouse
(P/21/0509).  The approved dwelling was of a different design to that proposed in this
application. 
5. Supporting Information
5.1. Design and Planning Statement - this outlines the proposed design of the
development. 
6. Consultations
6.1. Roads Development Management Team – No objections subject to the inclusion of
conditions relating to the numbers of off-street parking spaces, the provision of an
electric vehicle charging point, the provision of an appropriate visibility splay and
suitable surfacing.   
Response:  Noted. 
6.2. Environmental Services – No comments. 
Response:  Noted. 
92

Page 93

6.3. Scottish Water – There is sufficient capacity for water in the area to service the
development.   
Response:  Noted. 
7. Representations
7.1. Following the statutory period of neighbour notification and advertisement, a total of
25 representations have been received (20 objections, 5 support).  The issues raised
are summarised as follows:- 
Road safety, vehicular access and parking
 Concern regarding restricting access to existing properties on Wellwood Road
including safety, emergency vehicle access and turning space provision
 Lack of visibility 
 Concern regarding the existing level of insufficient on-street parking 
 Parking and access will be more difficult whilst construction works take place
 Objection to the access, not to the proposed house itself
 Parking restrictions could be used to improve access
 Construction traffic
 Increased traffic congestion
 Road safety 
Drainage
 There have been local drainage issues and the proposed development will affect
capacity 
Impact upon the environment and nature
 Significant disruption to nature and the environment in the area recently 
 Building works would impact upon the existing trees and wildlife habitats within the
application site 
Support
 Support for rejuvenating the neighbourhood
 Proposal fits well with neighbouring houses
 Sufficient parking provision 
Matters raised which are not material planning considerations 
 Property values may be impacted by parking congestion or by the erection of this
proposed house 
7.2. The above issues are considered in the assessment below.  These letters are available
for inspection on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  The development plan comprises the
South Lanarkshire Local Development Plan 2 and National Planning Framework 4. 
National Planning Framework 4
8.2. National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places.  
93

Page 94

National Planning Framework 4 Policies 
⧫ Policy 1 - Tackling the climate and nature crises
⧫ Policy 2 - Climate mitigation and adaptation
⧫ Policy 7 - Historic assets and places
⧫ Policy 14 - Design, quality and place
⧫ Policy 15 - Local Living and 20 minute neighbourhoods
⧫ Policy 16 - Quality homes 
8.3 South Lanarkshire Local Development Plan 2 (2021) 
The application site and associated proposals are affected by the following policies
contained in the South Lanarkshire Local Development Plan 2 (SLLDP2):- 
SLLDP2 Volume 1 Policies
⧫ Policy 1 – Spatial Strategy
⧫ Policy 2 - Climate Change
⧫ Policy 3 – General Urban Areas and Settlements
⧫ Policy 5 - Development Management and Placemaking
⧫ Policy 9 - Network of Centres and Retailing
⧫ Policy 14 - Natural and Historic Development 
SLLDP2 Volume 2 Policies
⧫ Policy DM1 - New Development Design
⧫ Policy NHE3 - Listed Buildings 
South Lanarkshire Council (SLC) Supporting Planning Guidance
None 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Full planning permission is sought for the Erection of 1.5 storey dwellinghouse with
associated works at 8A Abbeygreen, Lesmahagow, ML11 0DB.  The main issues to
be addressed in the determination of this application includes the acceptability in
principle of the proposed development, its layout, siting and design, and an
assessment of technical matters.  The policies contained within National Planning
Framework 4 and the South Lanarkshire Local Development Plan 2 are the main
consideration in this case, together with an assessment of any other material planning
considerations. 
10.2. Principle of Development 
The application site is located within the settlement boundary.  NPF4 Policy 15 – Local
Living and 20 Minute Neighbourhoods supports development proposals that will
contribute to local living and consideration will be given to the existing settlement
pattern and to the level and quality of interconnectivity of the proposed development
to local shops, services, parks and sustainable modes of transport.  Policy 16 – Quality
Homes sets out the conditions by which new homes will be supported.  This includes
supporting new homes within existing settlement boundaries where the proposal is
consistent with the development plan spatial strategy and with other relevant policies
including local living and 20-minute neighbourhoods.  SLLDP2 Policy 11 – Housing
supports housing developments on identified sites, subject to a range of house sizes
and types being provided and subject to the proposals according with the other
relevant polices in the development plan.  The site is also located on the edge of the
designated local centre, and SLLDP2 Policy 9 – Network of Centres and Retailing is
therefore relevant.  This policy seeks to support a network of Strategic, Town and
94

Page 95

Local Centres to provide retail and other local services.  In local centres an appropriate
mix of uses that will meet the economic and social need of the community is supported. 
10.3. In this instance, the site has not been identified as a specific housing site, however, it
is located within the settlement and is sited on the edge of the designated local centre. 
As it is located within the settlement boundary, the principle of building a
dwellinghouse at this site is acceptable in principle as it would constitute appropriate
infill development and the site is in close proximity to the local shops, services and
transport links on and around Abbeygreen, contributing successfully to local living
principles.  The use of this site for residential use would have no negative impact upon
the function of the local centre.  As such, the proposal is considered to accord with
NPF4 Policies 15 and 16 and SLLDP2 Policy 9.  It is further in accordance with Policies
1, 3 and 5 of the SLLDP2 as it appropriately directs development to urban areas. 
10.4. Climate Change 
NPF4 Policy 1 - Tackling the Climate and Nature Crises and NPF4 Policy 2 - Climate
Mitigation and Adaptation together aim to ensure that proposals for new development
must, where possible, seek to minimise and mitigate against the effects of climate
change.  In addition, SLLDP2 Policy 2 - Climate Change states that proposals for new
development must, where possible, seek to minimise and mitigate against the effects
of climate change.  The sites’ location within the settlement and its close proximity to
local services and transportation links are such that the proposal can be considered
to be sustainably located, and while the proposal would involve some loss of mature
landscaping, the overall impact upon the local environment would not be significant. 
As such, the proposal is considered to comply with the provisions of Policies 1 and 2
of NPF4 and Policy 2 of the SLLDP2.   
10.5. Layout, Siting and Design 
NPF4 Policy 14 – Design, Quality and Place requires development proposals to be
designed to improve the quality of an area and supports proposals where they are
consistent with the six qualities of successful places; healthy, pleasant, connected,
distinctive, sustainable, and adaptable.  SLLDP2 Policies 5 - Development
Management and Placemaking and DM1 - New Development Design state that
development proposals should take account of and be integrated within the local
context and built form.  New development should also have no significant adverse
impacts on the local community. 
10.6. The proposed dwellinghouse would be effectively 1.5 stories in height, finished with a
pitched roof.  The overall size, scale and design would suitably integrate with the local
area and the noted choices of external finishing materials are broadly acceptable, with
the final details able to be controlled by the inclusion of a suitably worded condition
given the setting of the proposed building.  There are some more modern design
elements such as the Juliet balconies to the side and rear elevations, and the large,
glazed doors to the rear, but overall, the proposal is reflective of the character of the
area.  The proposed layout provides a suitable vehicular access and three off-street
parking spaces as well as adequate garden amenity space and bin storage.  The
proposed layout, scale and design would also not introduce any significant amenity
issues in terms of overlooking or overshadowing neighbouring properties.  As such,
the proposal complies with NPF4 Policy 14 and with SLLDP2 Policies 5 and DM1. 
10.7. Other issues 
The adjacent former bank building is a Category B-Listed Building, and there is a
potential that development at this site may affect the character or setting of the Listed
Building.  NPF4 Policy 7 – Historic Assets and Places seeks to protect and enhance
historic environment assets and places.  Specifically, development proposals affecting
95

Page 96

the setting of a Listed Building should preserve its character, and its special
architectural or historic interest.  SLLDP2 Policies 14 – Natural and Historic
Environment and NHE3 – Listed Buildings similarly seek to protect these historic
assets and require development affecting a Listed Building or its setting, as a first
principle, to seek to preserve the building and its setting and any features of special
architectural interest which it has.   
10.8. The proposed dwellinghouse would be located within the grounds of this Listed
Building and in relative proximity, however, it would be positioned towards the rear of
the site.  Given its proposed setting, layout, form, and the topography of the area, it
would not significantly impact upon the setting or character of the Listed Building or
upon any special architectural features.  Sections of the existing rear boundary wall
adjacent to Wellwood Road will require to be removed and lowered in height to
accommodate the development, however, the partial removal of this wall will not
significantly impact upon the adjacent Listed Building.  As such, the proposal is
considered to comply with NPF4 Policy 7 and SLLDP2 Policies 14 and NHE3. 
10.9. Technical Matters 
Concerns have been expressed regarding the proposed driveway location and the
access, turning and parking situation in the local area.  Roads and Transportation
Services have offered no objections, subject to the inclusion of relevant conditions and
advisory notes.  The concerns about on-street parking and access are noted, but it is
also noted that Wellwood Road contains a number of existing driveways, and the
concerns raised already exist.  The proposal contains sufficient space for sufficient off-
street parking to accommodate the proposed house, and so it should not add to the
demand for on-street parking.  Therefore, it is considered that the additional driveway
will not significantly impact upon the availability of on-street parking.  Sufficient visibility
at the driveway can also be conditioned to ensure that there is no significant impact
upon public or road safety.  On balance, the proposed additional house and associated
access and parking can be adequately accommodated and is therefore acceptable in
terms of the above policies. 
10.10. Scottish Water raise no objection to the proposal, and the small-scale nature of the
single dwellinghouse and its urban location within the settlement is not considered to
give rise to any adverse environmental impacts.  As such, the proposal is considered
to satisfy technical matters. 
10.11. A number of letters of representation refer to the potential impact of the development
on property values.  For clarification, the impact of a proposal on property values is
not a material planning consideration and it therefore cannot be taken into
consideration when determining a planning application. 
11 Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Planning Permission Subject to the following Conditions:- 
01. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice.   
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended).  
96

Page 97

02. That before any development commences on site details and specification of
all materials to be used as external finishes on the development shall be
submitted to and approved by the Council as Planning Authority.  The
development shall thereafter be carried out in accordance with the approved
details to the satisfaction of the Council as Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
03. That before development starts, full details of the design and location of all
fences and walls, including any retaining walls, to be erected on the site shall
be submitted to and approved by the Council as Planning Authority.  The
development shall thereafter be carried out in accordance with the approved
details to the satisfaction of the Council as Planning Authority.   
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
04. That, unless otherwise agreed in writing with the Council as Planning Authority,
provision shall be made for electrical charging points within the development
for motor vehicles and mobility scooters.  Prior to any works commencing on
site, details of the proposed arrangements shall be submitted and agreed in
writing with the Council as Planning Authority. 
Reason: To ensure the provision of appropriate facilities on site. 
05. That before the development is completed or brought into use, all of the parking
spaces shown in Drawing HHP3/A1/102 on the approved plans shall be laid
out, constructed to the specification of the Council as Roads and Planning
Authority. 
Reason: To ensure the provision of adequate parking facilities within the site. 
06. That before the development hereby approved is completed or brought into use,
the new vehicular access so far as it lies within the boundaries of the road
abutting the site, shall be constructed in accordance with the specification of
the Council as Roads and Planning Authority. 
Reason: In the interests of traffic and public safety. 
07. That before the development is completed or brought into use, the first 2m of
the driveway shall be so trapped and finished in hardstanding as to prevent any
surface water or deleterious material from running onto or entering the road. 
Reason: In the interests of traffic safety and to prevent deleterious material
entering the road. 
08. That before the development hereby approved is completed or brought into use,
a visibility splay of 2 metres by 20 metres measured from the road channel shall
be provided to the left of vehicular access and everything exceeding 0.9 metres
in height above the road channel level shall be removed from the sight line
areas and thereafter nothing exceeding 0.9 metres in height shall be planted,
placed or erected within these sight lines to either the left or right of the vehicular
access.  
97

Page 98

Reason: In the interests of traffic and public safety. 
12 Reason for Decision
12.1. The proposal raises no significant amenity, environmental or infrastructure issues, and
it would have no significant adverse impact upon the setting of the adjacent Listed
Building.  The proposal therefore complies with Policies 1, 2, 7, 14, 15 and 16 of the
National Planning Framework 4 and Policies 2, 3, 5, 9, 14, DM1 and NHE3 of the
adopted South Lanarkshire Local Development Plan 2.  There are no other material
considerations which would justify the refusal of planning permission. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 28 August 2023 
Background Papers
Further information relating to the application can be found online:-
P/23/0301 | Erection of 1.5 storey dwellinghouse with associated works | 8A Abbeygreen
Lesmahagow ML11 0DB (southlanarkshire.gov.uk) 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
98

Page 99

99

Page 100

100

Page 101

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/23/0308
Proposal:  Erection of 6 wind turbines, access tracks and ancillary infrastructure
(Section 42 application to amend condition 1 of P/20/0406 to extend
time period to 16 April 2054 and Condition 15 to extend period for
decommissioning to three years) 
Site Address:  Muirhall Wind Farm
Auchengray
Lanark 
Applicant:  Muirhall Wind Farm Ltd 
Agent:  Muirhall Energy Ltd
Ward:  02 – Clydesdale North
Application Type:  Modification, Variation or Removal of Planning Conditions
Advert Type:  Environmental Impact Assessment (EIA) Report : Lanark Gazette 12
April 2023
EIA Report : Edinburgh Gazette 14 April 2023
Non-notification of neighbours: Lanark Gazette 12 April 2023
Bad Neighbour: Lanark Gazette 12 April 2023 
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant Subject to Conditions 
Legal Agreement:  Not Required
Direction to
Scottish Ministers 
Not Required 
9
101

Page 102

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
5.1 of the Decision-Making Process 2015 as it constitutes a major planning application. 
2. Site Description
2.1. The application site forms part of what is now considered as Phase 1 of the existing
Muirhall wind farm, which is located approximately 2 km south east of the settlement
of Auchengray.  The overall wind farm array comprises 11 turbines which were erected
over three phases and this particular phase involves 6 turbines, each at a height of
125m to blade tip.  The turbines have been operational since 2011.   
3. Description of Proposed Development
3.1. The application is made under Section 42 of the Town and Country Planning
(Scotland) Act 1997 (as amended) to vary the wording of planning conditions 1 and 15
attached to planning permission P/20/0406 (a previous Section 42 application that
granted consent for the original 25 years for the lifetime of the wind farm to be extended
to 30 years).  The applicant is now seeking consent for a 40 year operational period
for the Muirhall wind farm (condition 1) and extension of the period for carrying out
restoration of the site (condition 15) as follows and these changes are marked in italics. 
3.2 Condition 1 of application P/20/0406 states:- 
“That consent is granted from the date of this consent until 28th March 2041.” 
The applicant has requested that condition 1 be varied to read:- 
“That consent is granted from the date of this consent until 16th April 2054.” 
3.3 Condition 15 of planning application P/20/0406 states:- 
“Within 12 months of the end of the period of this consent as specified in condition 1
above, (unless a further consent is granted) all wind turbines, ancillary equipment and
buildings shall be dismantled and removed from the site and the land shall be restored
and subject to aftercare, in accordance with the restoration and aftercare scheme
referred to in Conditions 16 and 17.  For the purposes of this condition "restored"
means the removal of all wind turbines, turbine pads, initial layer of foundation and all
buildings and ancillary development.  Notwithstanding this requirement, no later than
one year prior to the commencement of the restoration and aftercare scheme, the
Council as Planning Authority, shall review the retention of pads, foundations,
cable/ducts, and access tracks within the context of the restoration strategy to identify
any elements to be retained on site or requiring alternative reinstatement.” 
The applicant has requested that condition 15 be varied to read:- 
“Within 3 years of the end of the period of this consent as specified in condition 1
above, (unless a further consent is granted) all wind turbines, ancillary equipment and
buildings shall be dismantled and removed from the site and the land shall be restored
and subject to aftercare, in accordance with the restoration and aftercare scheme
referred to in Conditions 16 and 17.  For the purposes of this condition "restored"
means the removal of all wind turbines, turbine pads, initial layer of foundation and all
buildings and ancillary development.  Notwithstanding this requirement, no later than
one year prior to the commencement of the restoration and aftercare scheme, the
Council as Planning Authority, shall review the retention of pads, foundations,
cable/ducts, and access tracks within the context of the restoration strategy to identify
any elements to be retained on site or requiring alternative reinstatement.”
102

Page 103

3.4 A separate planning application P/23/0309 which seeks similar changes to conditions
to the planning permission for phase 2 of Muirhall wind farm is the subject of a separate
report on this agenda. 
3.5 If successful, the effect of a Section 42 application to modify a planning condition or
conditions is to grant a further planning permission for the whole development but with
the amended condition or conditions replacing those that were previously issued, or
with conditions removed if required.  All other conditions, if relevant, are also required
to be attached to any new planning permission.  If the proposed changes to the
condition or conditions are deemed unacceptable, then Section 42 of the Act requires
the application to be refused.  Any refusal of an application under Section 42 of the
Act does not have any effect on the original planning permission which remains intact. 
4. Relevant Planning History
4.1. Muirhall wind farm comprises 11 turbines in total and was developed over three
phases under separate planning permissions.  In terms of phase 1, planning
permission was originally granted for 6 turbines at a maximum height of 125m to blade
tip in 2008 (Planning Ref: CL/05/0209) and was subject to a condition limiting the life
span of the turbines to 25 years.  A Section 42 application (ref: P/20/0406) was
approved in August 2020 to increase the operational timescale for the approved
turbines to 30 years ie until 2041.  This 2020 consent is the current, extant permission
that the 6 turbines are operating under and is therefore the permission that is subject
to this current Section 42 application. 
4.2 Phase 2 of the wind farm constituted a further 2 turbines at a maximum height of 145m
to tip height (Planning Ref: CL/12/0074 granted in September 2012).  This phase of
the wind farm has been operational since 2014 with a life span until 2039.  Planning
permission P/20/0409 was subsequently granted for the operational timescale of the
development to be extended by a further 2 years ie 2041. 
4.3 Phase 3 of the wind farm (Planning Ref: CL/14/0113) constituted a further 3 turbines
at a height of 147m to tip.  This application was originally refused on landscape and
visual matters but the subsequent appeal to the DPEA was sustained in July 2015. 
The turbines have now been operational since 2016 with a life span until 28 March
2041.  It should however be noted that this phase of the wind farm is now under
separate ownership. 
5. Supporting Information 
5.1. The applicant has submitted a number of supporting documents with the application,
including a Section 42 Supporting Statement setting out the justification for the
application, and copies of the original submitted Environmental Statement (ES)
documents and figures.   
6. Consultations
6.1. The Ministry of Defence (MOD) – no adverse comments or objections, as the turbine
location and dimensions haven’t altered from the previous approval.
Response:  Noted. 
6.2. National Air Traffic Services (NATS) – no adverse comments or objections to the
proposals.
Response:  Noted. 
6.3. Edinburgh Airport – no objection to the application, as the proposals do not conflict
with safeguarding criteria.   
Response:  Noted. 
103

Page 104

7. Representations
7.1 Following the statutory period of neighbour notification and advertisement, 1 letter of
representation, objecting to the application, has been received.  The issues raised are
summarised as follows:- 
 Too many wind farms in this area
 They are a blot on the landscape
 Damage to the local roads
 Damage to peat
 Damage to wildlife, including birds, bats and insects
 Interference with mobile phones, radar and television signals
 Only people who gain are MPs, the landowner and Councils 
The above issues will be considered in the assessment below.  This letter is available
for inspection on the planning portal.  
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2 National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation
 Policy 3 - Biodiversity
 Policy 4 - Natural places
 Policy 5 - Soils
 Policy 11 - Energy
 Policy 29 - Rural development 
8.3 South Lanarkshire Local Development Plan 2 (2021)
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
 Policy 14 - Natural and Historic Development
 Policy 15 - Travel and Transport
 Policy 18 - Renewable Energy  
104

Page 105

South Lanarkshire Council (SLC) Supporting Planning Guidance
 Renewable Energy (January 2021) 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  The policies contained within National
Planning Framework 4 and the South Lanarkshire Local Development Plan 2 are the
main consideration in this case, together with an assessment of any other material
planning considerations. 
10.2 As the proposals involve amendments to an existing consent, now implemented, there
is no opportunity to revisit the principle of the development, or any facets of the Original
Consent that do not form part of the proposed amendments.  Therefore, in this
instance, the assessment of the proposals relates solely to consideration of any
impacts that may arise from an increase in the permitted period of operation of Muirhall
Wind Farm from 25 to 40 years, and from the extended period proposed for site
decommissioning and restoration.  The main matters for the Council’s consideration
are therefore whether these extended periods for operation and
decommissioning/restoration of the wind farm would continue to comply with the
Development Plan.  No changes to the scale, design or layout of the approved scheme
are proposed. 
10.3 In determining whether the proposed extension to the operation of the wind farm is
acceptable, it should be noted that the 25 year time limit on the original permission
was not imposed to mitigate any effects of the wind turbines on the surrounding area,
but rather reflected the ‘industry standard’ at the time, in that the operational capacity
of turbines was limited by the technology then in place.   
10.4 However, as technology has advanced and wind farms become an established
feature, developers have sought to extend their operational time limits.  Overall, there
is a general presumption in favour of granting permission in such cases, unless
exceptional circumstances suggest otherwise.  In this instance, the policy direction on
wind farm development is broadly similar to when the original permission was granted,
and it is considered that the environmental impact of the proposals remains
unchanged.  In addition, the application, if successful, would result in an additional 13
years of renewable electricity generation for an already consented/operational wind
farm, which accords with policy direction at both a national and a local level.   
10.5 The previous consents, now implemented, first established the principle of a wind farm
development at Muirhall in 2008.  The amendments proposed relate, firstly, to an
extension of the permitted period of operation from 27 to 40 years for the full Wind
Farm site (in conjunction with application P/23/0309).  As such, the key issue in
assessing the application is whether the continued operation of the wind farm for a
further 13 years is considered acceptable.  In addition, consideration requires to be
given to the proposed extension of time for site decommissioning and restoration.  A
detailed assessment against NPF4, local development plan policy in the adopted
South Lanarkshire Local Plan 2 and its associated supporting planning guidance on
Renewable Energy has been carried out.  It is concluded that the extension of the
permitted period of operation for the Wind Farm and the extension of time for site
105

Page 106

decommissioning and restoration would accord with the relevant assessment criteria
and would not have any resultant significant, adverse impacts.
10.6 A single letter of objection to the application was received, and whilst noting the
comments the current application isn’t proposing any further wind turbines or
associated infrastructure on the existing wind farm site.  In addition, the principle of a
wind farm on the site was first established in 2008, with full consideration being given
to impacts on visual and residential amenity, impact on the local road network, impacts
on peat, wildlife, ecology, and biodiversity, and on potential interference issues.   
10.7 It should also be noted that the Original Permission is also subject to a legal agreement
to ensure the provision of a habitat management plan is implemented throughout the
lifetime of the wind farm.  The legal agreement also requires yearly contributions
(£2,500 per MW generated) to the South Lanarkshire Renewable Energy Fund.  It
should be noted that whilst not a material consideration to the assessment of the
application, if this application is successful, it would result in an additional 13 years of
payments being made to this fund.  The legal agreement has been structured in such
a way that any permission that supersedes the Original Permission (as would be the
case if this current application were permitted) would also be subject to the provisions
of the legal agreement and a variation of the agreement is not required. 
10.8 Conclusion 
In conclusion, it is considered that subject to the replication of the relevant (post
construction) conditions attached to the original permission, the proposals for the
extension of the operational life span of the wind farm, and for the extended period of
site decommissioning and restoration are considered acceptable.  It is, therefore,
recommended that the Planning Committee approve the application. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant consent subject to the following conditions:- 
01. That consent is granted from the date of this consent until 16 April 2054   
Reason: In order to define the terms of the consent. 
02. The development shall be carried out strictly in accordance with the terms of the
application and the accompanying Environmental Statement (ES) as amended in part
by the addendum, including all mitigation measures as stated therein subject to the
conditions below, such conditions having precedence over the terms of the application,
the ES, and the Addendum.   
Reason: In order to define the terms of the consent. 
03. That within 3 months of the date of decision, a guarantee to cover all site restoration
and aftercare liabilities imposed on the expiry of this consent will be submitted for the
written approval of the planning authority.  Such guarantee must:- 
i. be granted in favour of the planning authority; 
ii. be granted by a bank or other institution which is of sound financial standing and
capable of fulfilling the obligations under the guarantee; 
iii. be for an amount which covers the value of all site restoration and aftercare;
liabilities as determined by the planning authority at the commencement of
development;  
106

Page 107

iv. contain provisions so that all the site restoration and aftercare liabilities as
determined at the commencement of development shall be increased on each fifth
anniversary of the date of this consent; 
v. come into effect on or before the date of commencement of development and expire
no earlier than 24 months after the end of the aftercare period.   
Reason: In the interests of amenity and in order to retain effective planning control. 
04. In the event of any turbine, or group of turbines, failing or being no longer required for
electricity generation, or any other reason, for a continuous period of six months,
unless otherwise agreed with the planning authority, the turbine(s) shall be replaced
(in the case of failures), or dismantled and removed.  In the case of removal, that part
of the site accommodating the turbine, the turbine pad and access roads shall be
reinstated within three months of the end of the six month period of non-generation in
accordance with the agreed scheme under condition 51 of this permission, all to the
satisfaction of the Council as Planning Authority.   
Reason: In order to define the terms of the consent. 
05. That within 6 months from the date of this decision, a monitoring plan shall be
submitted to the Council as Planning Authority setting out the steps that shall be taken
to monitor the environmental effects of the development during the operational phase. 
The plan shall make specific reference to habitat creation, biodiversity impact, ground
water, surface water, noise, and dust.  Thereafter, the plan shall be implemented to
the satisfaction of the Council.  Results of such monitoring to be submitted to the
Council on a 6 monthly basis, or a frequency agreed in writing by the Council, as
Planning Authority.   
Reason: In the interest of amenity and the environment. 
06. Throughout the decommissioning and subsequent restoration of the site, an
appropriately qualified environmental clerk of works named to and approved by the
Council as Planning Authority shall be made available by the developer to direct said
works.  The ecological clerk of works shall also check water quality and other
ecological matters and shall provide regular reports as an input to the compliance
assessment.   
Reason: In order to ensure suitable restoration. 
07. That within 6 months from the date of this decision, a Pollution Prevention and Incident
Plan which includes mitigation measures against environmental pollution during the
life of the site shall be submitted to the Council as Planning Authority.   
Reason: In the interests of pollution prevention. 
08. At the reasonable request of the Council as Planning Authority and following a
complaint to the Council relating to noise emissions arising from the operation of the
wind farm, the wind farm operator shall appoint an independent noise consultant,
whose appointment shall require to be approved by the Council, to measure the level
of noise emission from the wind farm at the property to which the complaint related. 
The measurement and calculation of noise levels shall be undertaken in accordance
with ETSU-R-97 having regard to paragraphs 1 to 3 and 5 to 11 inclusive of the
schedule on Pages 95 to 97 inclusive, and Supplementary Guidance Notes to the
Planning Obligation pages 99 to 109 of ETSU-R-97.  
107

Page 108

Reason: In the interests of amenity. 
09. Noise from the wind turbines shall not exceed the following levels at the boundary of
the curtilage of any adjacent noise sensitive premises at wind speeds of up to 9 metres
per second at 10m height as measured on the site:- 
-  Quiet Daytime Hours, as defined in ETSU-R-97 as all evenings 1800 to 2300,
Saturdays 1300 to 1800 and Sundays 0700 to 1800, background noise level plus
5dB(A) L90 or 40 dB(A) L90 whichever is the greater; 
-  Night time Hours, as defined in ETSU-R-97 as 2300 to 0700 on all days plus 5dB(A)
L90 or 43 dB(A) L90, whichever is the greater.   
Reason: In the interests of amenity. 
10. If the tonal noise emitted by the development exceeds the threshold of audibility by
6.5dB or more, then the acceptable noise specified in condition 9 shall be reduced by
5dB, always providing that the definition of audibility for the purposes of this condition
shall be as described in 'The Assessment and rating of Noise from Wind Farms (ETSU-
R-97).   
Reason: In the interests of amenity. 
11. Pursuant to condition 8 above, where an assessment of any noise impact which, in
the opinion of the Council as Planning Authority acting reasonably, is found to be in
breach of the noise limits described in condition 9, the developer shall carry out
mitigation measures to remediate the breach so caused.  Details of any such mitigation
measures required are to be submitted to the planning authority for prior approval.   
Reason: In the interests of amenity. 
12. That within 3 months from the date of this decision, details shall be submitted to the
Council as Planning Authority of groundwater management, water treatment and the
means of drainage from all hard surfaces and structures within the site.  For the
purposes of this condition, "hard surfaces" includes internal access tracks,
construction and laydown areas, turbine pads and crane pads.  The details to be
submitted should indicate the means of protecting groundwater and diverting surface
water run-off and will allow for the recharging of peat areas within the site.  Thereafter
the approved measures shall be implemented for the lifetime of the development,
hereby approved.   
Reason: In the interests of hydrology. 
13. The clearance of snow from access tracks will be by mechanical means only unless
otherwise agreed in writing by the Council as Planning Authority.  For the avoidance
of doubt the use of chemicals or salt based material is not to be used for snow
clearance purposes.   
Reason: In the interests of the environment. 
14. Any fuel, oil, lubricant, paint, or solvent stored on site should be contained within bunds
or double skin tanks which must be locked and capable of containing at least 110% of
the largest capacity vessel stored therein and any spillage of any oil shall be dealt with
immediately.   
Reason: In the interests of the environment. 
108

Page 109

15. Within 3 years of the end of the period of this consent, as specified in condition 1
above, (unless a further consent is granted) all wind turbines, ancillary equipment and
buildings shall be dismantled and removed from the site and the land shall be restored
and subject to aftercare, in accordance with the restoration and aftercare scheme
referred to in Conditions 16 and 17.  For the purposes of this condition "restored"
means the removal of all wind turbines, turbine pads, initial layer of foundation and all
buildings and ancillary development.  Notwithstanding this requirement, no later than
one year prior to the commencement of the restoration and aftercare scheme, the
Council as Planning Authority shall review the retention of pads, foundations,
cable/ducts, and access tracks within the context of the restoration strategy, to identify
any elements to be retained on site or requiring alternative reinstatement.   
Reason: In the interests of restoration. 
16. Prior to the decommissioning of any turbine, an aftercare scheme for the restored site
shall be submitted to and approved by the Council as Planning Authority and thereafter
implemented to its satisfaction.  The aftercare scheme shall include the measures
necessary to manage the site or that part of the site as the case may be in accordance
with the habitat management plan subject to the Section 75 Agreement compiled in
conjunction with this planning permission.   
Reason: In the interests of aftercare. 
17. Without prejudice to the generality of condition 16 above, prior to the development
becoming operational, the restoration plan will include details of phased
decommissioning, the land use prevailing after decommissioning has taken place, the
means of disposal of all waste materials and road metal, the dismantling
methodologies for each turbine setting out the extent of recovery or of recycling of all
metals and other recyclable parts, the means of removing the turbine bases and crane
pads and the removal of cabling and ducts within the site. 
Reason: In the interests of restoration. 
18. That within 3 months from the date of this decision, a written scheme, setting out a
protocol for the assessment of shadow flicker (and including mitigation measures) in
the event of the receipt of a complaint, shall be submitted and approved by the Council
as Planning Authority.  Operation of the turbines shall take place in accordance with
the approved protocol unless the Council gives its prior written approval to any
variation. 
Reason: In the interest of amenity. 
19. The wind farm operator shall undertake of monitoring of migratory pink-footed geese
birds from the date of this consent: at five yearly intervals, at 1, 5, 10 and 15 years
thereafter.  Surveys during operation shall record bird strikes and bird movement
during the migratory period between September and November.  Within one month of
the issue of planning permission the detail and methodology for the ornithological
monitoring and reporting of results shall be submitted to and approved by the Council
as Planning Authority in consultation with Scottish Natural Heritage and such other
parties the Planning Authority considers appropriate.  The findings of these surveys
shall be collated into two reports, at three and fifteen years after commissioning of the
development, and all of the original data, and the reports, shall be made available to
the Planning Authority, Scottish Natural Heritage and other such parties as the
Planning Authority considers appropriate.  
109

Page 110

Reason: In the interests of ornithology. 
12. Reason for Decision
12.1. The proposals to extend the lifespan of a wind farm development that already benefits
from planning consent by 13 years to 16 April 2054, and to extend the period for site
decommissioning to 3 years are considered acceptable, subject to the imposition of
the previous suite of applicable environmental conditions.  The proposals are
considered to accord with Policies 1, 2, 3, 4, 5, 11 and 29 of the National Planning
Framework 4, and with Policies 1, 2, 4, 5, 14, 15, and 18 of the adopted South
Lanarkshire Local Development Plan 2 and its supporting planning guidance on
Renewable Energy. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 28 August 2023 
Background Papers
Further information relating to the application can be found online:- 
P/23/0308 | Erection of 6 wind turbines, access tracks and ancillary infrastructure (Section 42
application to amend condition 1 of P/20/0406 to extend time period to 16.04.2054 and Condition 15
to extend period for decommissioning to three years) | Muirhall Wind Farm Auchengray Lanark 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
110

Page 111

111

Page 112

112

Page 113

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/23/0309
Proposal:  Extension to existing Muirhall wind farm involving erection of two 145
metre high wind turbines and associated infrastructure (Section 42
application to amend condition 2 of P/20/0409 to extend time period
to 16 April 2054 and Condition 4 to extend period for
decommissioning to three years) 
Site Address:  Muirhall Wind Farm
Auchengray
Lanark 
Applicant:  Muirhall WF Extension Ltd 
Agent:  Muirhall Energy Ltd
Ward:  02 – Clydesdale North
Application Type:  Modification, Variation or Removal of Planning Conditions
Advert Type:  Environmental Impact Assessment (EIA) Report : Lanark Gazette 12
April 2023
EIA Report : Edinburgh Gazette 14 April 2023
Non-notification of neighbours: Lanark Gazette 12 April 2023
Bad Neighbour: Lanark Gazette 12 April 2023 
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant subject to Conditions 
Legal Agreement:  Not Required
Direction to
Scottish Ministers 
Not Required 
10
113

Page 114

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
5.1 of the Decision-Making Process 2015 as it constitutes a major planning application. 
2. Site Description
2.1. The application site forms part of what is now considered as the Phase 2 extension of
the existing Muirhall wind farm, which is located approximately 2 km south east of the
settlement of Auchengray.  The overall wind farm array comprises 11 turbines which
were erected over three phases (as described in 3.6 below).  This particular phase
involves the erection of 2 turbines, both at a height of 145m to blade tip.  The turbines
have been operational since 16 April 2014.   
3. Description of Proposed Development
3.1. The application is made under Section 42 of the Town and Country Planning
(Scotland) Act 1997 (as amended) to vary the wording of planning conditions 2 and 4
attached to planning permission P/20/0409 (a previous Section 42 application for
Phase 2 of the Muirhall wind farm that granted consent for the operational timescale
of the development for a further 2 years).  The applicant is now seeking consent for a
40 year operational period for the Muirhall wind farm (condition 2) and the period for
carrying out restoration of the site (condition 4) as follows and these changes are
marked in italics. 
3.2 Condition 2 of application P/20/0409 states:- 
“That consent is granted from the date of this consent until 28th March 2041.” 
The applicant has requested that condition 2 be varied to read:- 
“That consent is granted from the date of this consent until 16th April 2054.” 
3.3 Condition 4 of planning application P/20/0409 states:- 
“Within 12 months of the end of the period of consent (unless a further consent is
granted) all wind turbines, ancillary equipment and buildings shall be dismantled and
removed from site and the land restored and subject to aftercare, in accordance with
the restoration and aftercare scheme referred to in Condition 5.  For the purposes of
this condition 'restored' means the removal of all wind turbines, turbine pads, initial
layers of foundation and all buildings and ancillary development.  Notwithstanding this
requirement, no later than one year prior to the commencement of the restoration and
aftercare scheme, the planning authority, shall review the retention of pads,
foundations, cable/ducts, and access tracks within the context of the restoration
strategy to identify any elements to be retained on site or requiring alternative
reinstatement.” 
The applicant has requested that condition 4 be varied to read:- 
“Within 3 years of the end of the period of consent (unless a further consent is granted)
all wind turbines, ancillary equipment and buildings shall be dismantled and removed
from site and the land restored and subject to aftercare, in accordance with the
restoration and aftercare scheme referred to in Condition 5.  For the purposes of this
condition 'restored' means the removal of all wind turbines, turbine pads, initial layers
of foundation and all buildings and ancillary development.  Notwithstanding this
requirement, no later than one year prior to the commencement of the restoration and
aftercare scheme, the planning authority, shall review the retention of pads,
foundations, cable/ducts, and access tracks within the context of the restoration
114

Page 115

strategy to identify any elements to be retained on site or requiring alternative
reinstatement.” 
3.4 A separate planning application P/23/0308 which seeks similar changes to conditions
to the planning permission for phase 1 of Muirhall wind farm is the subject of a separate
report on this agenda. 
3.5 If successful, the effect of a Section 42 application to modify a planning condition or
conditions is to grant a further planning permission for the whole development but with
the amended condition or conditions replacing those that were previously issued, or
with conditions removed if required.  All other conditions, if relevant, are also required
to be attached to any new planning permission.  If the proposed changes to the
condition or conditions are deemed unacceptable, then Section 42 of the Act requires
the application to be refused.  Any refusal of an application under Section 42 of the
Act does not have any effect on the original planning permission which remains intact. 
4. Relevant Planning History
4.1. Muirhall wind farm comprises 11 turbines in total and was developed over three
phases under separate planning permissions.  In terms of phase 1 planning
permission was originally granted for 6 turbines at a maximum height of 125m to blade
tip in 2008 (Planning Ref: CL/05/0209).  A Section 42 application (ref: P/20/0406) was
approved in August 2020 to increase the operational timescale for the approved
turbines to 30 years ie until 2041. 
4.2 Phase 2 of the wind farm constituted a further 2 turbines at a maximum height of 145m
to tip height (Planning Ref: CL/12/0074 granted in September 2012).  This phase of
the wind farm has been operational since 2014 and was subject to a condition limiting
the life span of the turbines to 25 years ie until 2039.  Planning permission P/20/0409
was subsequently granted for the operational timescale of the development to be
extended by a further 2 years ie 2041.  This 2020 consent is the current, extant
permission that phase 2 of the wind farm is operating under and is therefore the
permission that is subject to this current Section 42 application. 
4.3 Phase 3 of the wind farm (Planning Ref: CL/14/0113) constituted a further 3 turbines
at a height of 147m to tip.  This application was originally refused on landscape and
visual matters but the subsequent appeal to the DPEA was sustained in July 2015. 
The turbines have now been operational since 2016 with a life span until 28 March
2041.  It should however be noted that this phase of the wind farm is now under
separate ownership. 
5. Supporting Information 
5.1. The applicant has submitted a number of supporting documents with the application,
including a Section 42 Supporting Statement setting out the justification for the
application, and copies of the original submitted Environmental Statement (ES)
documents and figures.   
6. Consultations
6.1. The Ministry of Defence (MOD) – no adverse comments or objections, as the turbine
location and dimensions haven’t altered from the previous approval.
Response:  Noted. 
6.2. National Air Traffic Services (NATS) – no adverse comments or objections to the
proposals.
Response:  Noted.  
115

Page 116

6.3. Edinburgh Airport – no objection to the application, as the proposals do not conflict
with safeguarding criteria.   
Response:  Noted. 
7. Representations
7.1 Following the statutory period of neighbour notification and advertisement, 1 letter of
representation, objecting to the application, has been received.  The issues raised are
summarised as follows:- 
 Too many wind farms in this area
 They are a blot on the landscape
 Damage to the local roads
 Damage to peat
 Damage to wildlife, including birds, bats and insects
 Interference with mobile phones, radar and television signals
 Only people who gain are MPs, the landowner and Councils 
The above issues will be considered in the assessment below and the full copy is
available to view on the planning portal. 
8. Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2 National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises 
 Policy 2 - Climate mitigation and adaptation
 Policy 3 - Biodiversity
 Policy 4 - Natural places
 Policy 5 - Soils
 Policy 11 - Energy
 Policy 29 - Rural development 
8.3 South Lanarkshire Local Development Plan 2 (2021)
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 1 - Spatial Strategy
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
 Policy 14 - Natural and Historic Development
 Policy 15 - Travel and Transport
 Policy 18 - Renewable Energy 
116

Page 117

South Lanarkshire Council (SLC) Supporting Planning Guidance
 Renewable Energy (January 2021) 
9. Guidance
9.1. None applicable. 
10. Assessment and Discussion
10.1. Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997,
all applications must be determined in accordance with the development plan unless
material considerations indicate otherwise.  The policies contained within National
Planning Framework 4 and the South Lanarkshire Local Development Plan 2 are the
main consideration in this case, together with an assessment of any other material
planning considerations. 
10.2 As the proposals involve amendments to an existing consent, now implemented, there
is no need to revisit the principle of the development, or any facets of the Original
Consent that do not form part of the proposed amendments.  Therefore, in this
instance, the assessment of the proposals relates solely to consideration of any
impacts that may arise from an increase in the permitted period of operation of the
Muirhall Wind Farm extension, from 27 to 40 years, and from the extended period
proposed for site decommissioning and restoration.  The main matters for the Council’s
consideration are therefore whether these extended periods for operation and
decommissioning/restoration of the wind farm would continue to comply with the
Development Plan.  No changes to the scale, design or layout of the approved scheme
are proposed. 
10.3 In determining whether the proposed extension to the operation of the wind farm is
acceptable, it should be noted that the 25 year time limit on the original permission
was not imposed to mitigate any effects of the wind turbines on the surrounding area,
but rather reflected the ‘industry standard’ at the time, in that the operational capacity
of turbines was limited by the technology then in place.   
10.4 However, as technology has advanced and wind farms become an established
feature, developers have sought to extend their operational time limits.  Overall, there
is a general presumption in favour of granting permission in such cases, unless
exceptional circumstances suggest otherwise.  In this instance, the policy direction on
wind farm development is broadly similar to when the original permission was granted,
and it is considered that the environmental impact of the proposals remains
unchanged.  In addition, the application, if successful, would result in an additional 13
years of renewable electricity generation for an already consented/operational wind
farm, which accords with policy direction at both a national and a local level. 
10.5 The previous consents, now implemented, first established the principle of a wind farm
development at Muirhall in 2008.  The amendments proposed relate, firstly, to an
extension of the permitted period of operation from 27 to 40 years for the extension to
the original wind farm site (in conjunction with application P/23/0308).  As such, the
key issue in assessing the application is whether the continued operation of the wind
farm for a further 13 years is considered acceptable.  In addition, consideration
requires to be given to the proposed extension of time for site decommissioning and
restoration.  A detailed assessment against NPF4, local development plan policy in
the adopted South Lanarkshire Local Plan 2 and its associated supporting planning
guidance on Renewable Energy has been carried out.  It is concluded that the
extension of the permitted period of operation for the extension to the wind farm, and
the extension of time for site decommissioning and restoration, would accord with the
117

Page 118

relevant assessment criteria and would not have any resultant significant, adverse
impacts.
10.6 A single letter of objection to the application was received, and whilst noting the
comments, the current application isn’t proposing any further wind turbines or
associated infrastructure on the existing wind farm site.  In addition, the principle of a
wind farm on the Muirhall wind farm site was first established in 2008, with an
additional 2 turbines granted consent in 2012.  Full consideration would have been
given to impacts on visual and residential amenity, impact on the local road network,
impacts on peat, wildlife, ecology, and biodiversity, and on potential interference
issues on both applications.   
10.7 It should also be noted that the Original Permission is also subject to a legal agreement
to ensure the provision of a habitat management plan is implemented throughout the
lifetime of the wind farm.  The legal agreement also requires yearly contributions
(£2,500 per MW generated) to the South Lanarkshire Renewable Energy Fund.  It
should be noted that whilst not a material consideration to the assessment of the
application, if this application is successful, it would result in an additional 13 years of
payments being made to this fund.  The legal agreement has been structured in such
a way that any permission that supersedes the Original Permission (as would be the
case if this current application were permitted) would also be subject to the provisions
of the legal agreement and a variation of the agreement is not required. 
10.8 Conclusion 
In conclusion, it is considered that subject to the replication of the relevant (post
construction) conditions attached to the original permission, the proposals for the
extension of the operational life span of the wind farm extension, and for the extended
period of site decommissioning and restoration are considered acceptable.  It is,
therefore, recommended that the Planning Committee approve the application. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant the further application, subject to conditions:- 
01. The development shall be carried out strictly in accordance with the terms of the
application and the accompanying ES (Muirhall Wind Farm Extension Environmental
Statement) as amended in part by the addendum, including all mitigation measures as
stated therein subject to the conditions below, such conditions having precedence over
the terms of the application, the ES, and the Addendum.   
Reason: In order to define the terms of the consent. 
02. That consent is granted from the date of this consent until 16 April 2054.   
Reason: In order to define the terms of the consent. 
03. That within 3 months of the date of decision, a guarantee to cover all site restoration
and aftercare liabilities imposed on the expiry of this consent will be submitted for the
written approval of the planning authority.  Such guarantee must:- 
i. be granted in favour of the planning authority; 
ii. be granted by a bank or other institution which is of sound financial standing and
capable of fulfilling the obligations under the guarantee;  
118

Page 119

iii. be for an amount which covers the value of all site restoration and aftercare liabilities
as determined by the planning authority at the commencement of development; 
iv. contain provisions so that all the site restoration and aftercare liabilities as
determined at the commencement of development shall be increased on each fifth
anniversary of the date of this consent; 
v. come into effect on or before the date of commencement of development and expire
no earlier than 24 months after the end of the aftercare period.   
Reason: In the interests of amenity and in order to retain effective planning control. 
04. Within 3 years of the end of the period of consent (unless a further consent is granted)
all wind turbines, ancillary equipment and buildings shall be dismantled and removed
from site and the land restored and subject to aftercare, in accordance with the
restoration and aftercare scheme referred to in Condition 5.  For the purposes of this
condition 'restored' means the removal of all wind turbines, turbine pads, initial layers
of foundation and all buildings and ancillary development.  Notwithstanding this
requirement, no later than one year prior to the commencement of the restoration and
aftercare scheme, the planning authority, shall review the retention of pads,
foundations, cable/ducts, and access tracks within the context of the restoration
strategy to identify any elements to be retained on site or requiring alternative
reinstatement.   
Reason: In the interests of restoration. 
05. That within 6 months from the date of this decision, a restoration plan shall be
submitted to and approved by the Council as Planning Authority and shall include
details of phased decommissioning, the means of reinstating the site following the
removal of the components of the development, the land use prevailing after
decommissioning has taken place, the means of disposal of all waste materials and
road metal, the dismantling methodologies for each turbine setting out the extent of
recovery or of recycling of all metals and other recyclable parts, the means of removing
the turbine bases and crane pads and the removal of cabling and ducts within the site. 
Reason: In the interests of restoration. 
06. Noise from the wind turbine shall not exceed 35db LA90 (10min) or background LA90
(10 min) + 5db, whichever is the greater at the boundary of the curtilage of any noise
sensitive properties at all times at wind speeds of up to 9 metres per second as
measured within the site. 
If the tonal noise emitted by the development exceeds the threshold of audibility by
6.5db or more, then the acceptable noise specified above shall be reduced by 5db,
always providing that the definition of audibility for the purposes of this condition shall
be described in 'The Assessment and rating of Noise from Wind Farms (ETSU-R-97).   
Reason: In the interest of amenity. 
119

Page 120

07. At the reasonable request of the Council as Planning Authority and following a
complaint to the Council relating to noise emissions arising from the operation of the
wind farm, the wind farm operator shall appoint an independent noise consultant,
whose appointment shall require to be approved by the Council, to measure the level
of noise emission from the wind farm at the property to which the complaint related.   
Reason: In the interests of amenity. 
08. Pursuant to condition 7 above, where an assessment of any noise impact which, in
the opinion of the Council as Planning Authority acting reasonably, is found to be in
breach of the noise limits described in condition 6, the developer shall carry out
mitigation measures to remediate the breach so caused.  Details of any such mitigation
measures required are to be submitted to the planning authority for prior approval.   
Reason: In the interests of amenity. 
09. Within 3 months from the date of this permission an updated badger protection plan
shall be submitted for the written approval of the Council, as Planning Authority.  For
the avoidance of doubt this protection plan shall show a clearly visible exclusion zone
200 metres around any badger setts and maintained as such for the lifetime of the
development hereby approved, including any decommissioning works.   
Reason: In the interests of badger protection. 
10. That within 3 months from the date of this decision, a written scheme, setting out a
protocol for the assessment of shadow flicker (and including mitigation measures) in
the event of the receipt of a complaint, shall be submitted and approved by the Council
as Planning Authority.  Operation of the turbines shall take place in accordance with
the approved protocol unless the Council gives its prior written approval to any
variation.   
Reason: In the interest of amenity. 
11. The right of way which crosses the application site shall remain open to the public at
all times during the operation, decommissioning and reinstatement phases of the
development hereby approved.   
Reason: In the interests of public access. 
12. In the event of any turbine, or group of turbines, failing or being no longer required for
electricity generation, or any other reason, for a continuous period of six months,
unless otherwise agreed with the planning authority, the turbine(s) shall be replaced
(in the case of failures), or dismantled and removed.  In the case of removal, that part
of the site accommodating the turbine, the turbine pad and access roads shall be
reinstated within three months of the end of the six month period of non-generation in
accordance with the agreed scheme under condition 5 of this permission, all to the
satisfaction of the Council as Planning Authority. 
Reason: In order to define the terms of the consent. 
13. The blades of the turbines shall both rotate in the same direction as each other and
the turbines on the adjoining Muirhall wind farm (Phase 1). 
Reason: In the interests of amenity.  
120

Page 121

14. Throughout the decommissioning and subsequent restoration of the site, an
appropriately qualified environmental clerk of works named to and approved by the
Council as Planning Authority shall be made available by the developer to direct said
works.  The ecological clerk of works shall also check water quality and other
ecological matters and shall provide regular reports as an input to the compliance
assessment. 
Reason: In order to ensure suitable restoration. 
12. Reason for Decision
12.1. The proposals to extend the lifespan of a wind farm development that already benefits
from planning consent by 13 years to 16 April 2054, and to extend the period for site
decommissioning to 3 years are considered acceptable, subject to the imposition of
the previous suite of applicable environmental conditions.  The amended lifespan of
the wind farm would allow substantial additional renewable energy to be generated
and is not considered to result in any adverse impacts in relation to the previous
consented development.  The proposals are considered to accord with Policies 1, 2,
3, 4, 5, 11 and 29 of the National Planning Framework 4, and with Policies 1, 2, 4, 5,
14, 15, and 18 of the adopted South Lanarkshire Local Development Plan 2 and its
supporting planning guidance on Renewable Energy. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 28 August 2023 
Background Papers
Further information relating to the application can be found online:- 
P/23/0309 | Extension to existing Muirhall wind farm involving erection of two 145 metre high wind
turbines and associated infrastructure (Section 42 application to amend condition 2 of P/20/0409 to
extend time period to 16.04.2054 and Condition 4 to extend period for decommissioning to three
years) | Muirhall Wind Farm Auchengray Lanark 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
121

Page 122

eason: In the interests of amenity   
15. Throughout the decommissioning and subsequent restoration of the site, an
appropriately qualified environmental clerk of works named to and approved by the
Council as Planning Authority shall be made available by the developer to direct said
works. The ecological clerk of works shall also check water quality and other
ecological matters and shall provide regular reports as an input to the compliance
assessment.   
Reason: In order to ensure suitable restoration. 
13. Reason for Decision
12.1. The proposals to extend the lifespan of a wind farm development that already benefits
from planning consent by 13 years to 16th April 2054, and to extend the period for site
decommissioning to 3 years are considered acceptable, subject to the imposition of
the previous suite of applicable environmental conditions.  The amended lifespan of
the wind farm would allow substantial additional renewable energy to be generated, is
not considered to result in any adverse impacts in relation to the previous consented
development. The proposals are considered to accord with policies 1, 2, 3, 4, 5, 11
and 29 of the National Planning Framework 4, and with policies 1, 2, 4, 5, 14, 15, and
18 of the adopted South Lanarkshire Local Development Plan 2 and its supporting
planning guidance on Renewable Energy. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 
Background Papers
Further information relating to the application can be found online: 
P/23/0309 | Extension to existing Muirhall wind farm involving erection of two 145 metre high wind
turbines and associated infrastructure (Section 42 application to amend condition 2 of P/20/0409 to
extend time period to 16.04.2054 and Condition 4 to extend period for decommissioning to three
years) | Muirhall Wind Farm Auchengray Lanark (southlanarkshire.gov.uk)
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
122

Page 123

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/23/0431
Proposal:  Substitution of house types and reduction of units consisting of 55
detached, semi-detached and terraced and 9 flats, including 17
affordable housing units and associated road realignment
(amendment to P/21/1901)
Site Address:  Former Hoover Site Phase 4
Dale Avenue
Cambuslang
G72 7TZ
Applicant:  Dawn Homes Limited
Agent:  Hypostyle Architects
Ward:  13 Cambuslang West
Application Type:  Full Planning Permission
Advert Type:  Non-notification of neighbours: Rutherglen Reformer 26 April 2023
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant Subject to Conditions
Legal Agreement:  Not required
Direction to
Scottish Ministers 
Not Required 
11
123

Page 124

1. Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
5.1 of the Decision-Making Process 2015: detailed housing proposals comprising 50
or more units. 
2. Site Description
2.1. The planning application site relates to an area of land to the south of Dale Avenue in
Cambuslang forming part of the cleared site of the former Hoover factory.  The site
extends to approximately 3.77 hectares.  The site is bounded to the southwest by the
main Glasgow to London railway line and to the south-east by recently constructed
residential development, to the north-west by the Trade Team Tennent’s Distribution
Depot and to the north-east by open vacant land which has Planning Consent for a
recreational cycle park. 
3. Description of Proposed Development
3.1  Planning permission is sought for the substitution of house types from 71 residential
units to the erection of 64 residential units, consisting of 55 detached, semi-detached
and terraced and 9 flats, including 17 affordable housing units and associated road
realignment/alterations (amendment to P/21/1901). 
3.2 The development will be accessed via Dale Avenue, and a significant area of mature
trees is located to the north-west of the site and separates the site from the commercial
distribution depot to the north.  Structural planting and a landscaped noise bund will
separate the development from the railway to the south-west.  Previously consented
sites provide the main area of open space area to the west of the site close to the
River Clyde.  Approximately half of this open space houses the SUDs basin for the
wider site and the remainder is being laid out as informal open space with a formal
games court located adjacent to the SUDs basin.  New footpath and cycle path links
are provided to the Clyde Walkway on the River Clyde as part of previous consents. 
4. Relevant Planning History
4.1  Planning Permission in Principle (CR/11/0248) was granted to Forrest Developments
Limited and St Vincent (435) c/o Dawn Developments Limited in March 2012 for a
mixed use development for the regeneration of the Hoover/Bridge Street site in
Cambuslang, comprising a supermarket, 208 houses, relocation of business and
industry, a spine road linking the new junction at Bridge Street through the site to
Dallas Drive, a park and ride facility to serve Cambuslang Station, landscaping and
footpath links.   
4.2  There have been three previous phases completed on the original site.  Planning
consent for this specific area (phase 4) was granted in 2023 for the erection of 71
residential units, consisting of 62 detached, semi-detached and terraced, 9 flats,
including 17 affordable housing units, formation of 2 new vehicular accesses and
associated infrastructure under planning consent P/21/1901. 
5. Supporting Information 
5.1  None applicable. 
6. Consultations
6.1  Roads and Transportation Services (Development Management) – no objection
subject to the imposition of a planning condition relating to the submission of a Traffic
Management Plan for the development prior to commencement on site. 
Response: Noted.  
124

Page 125

7. Representations
7.1 Following the statutory period of neighbour notification, no valid representations have
been received. 
8. Development Plan
8.1 Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2 National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises
 Policy 2 - Climate mitigation and adaptation
 Policy 3 – Biodiversity
 Policy 14 - Design, quality and place
 Policy 15 - Local living and 20-minute neighbourhoods
 Policy 16 - Quality homes
 Policy 22 Flood Risk and Water Management
 Policy 26 Business and Industry
8.3 South Lanarkshire Local Development Plan 2(2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies 
 Policy 2 - Climate Change 
 Policy 5 - Development Management and Placemaking
 Policy 8 - Employment 
 Policy 13 – Green Network and Greenspace
 Policy 15 – Travel and Transport
 Policy 16 – Water Environment and Flooding 
SLLDP2 Volume 2 Policies 
 Policy SDCC2 – Flood Risk
 Policy SDCC3 – Sustainable Drainage Systems
 Policy DM1 – New Development Design
 Policy ICD2 - Non-conforming Uses in Core Industrial/Business Areas 
South Lanarkshire Council (SLC) Supporting Planning Guidance
Residential Development Guide 
9. Guidance
9.1. None applicable.  
125

Page 126

10. Assessment and Discussion
10.1. Introduction 
The applicant, Dawn Homes Limited, seeks consent for the substitution of house types
from 71 residential units to the erection of 64 residential units, consisting of 55
detached, semi-detached and terraced and 9 flats, including 17 affordable housing
units and associated road realignment (amendment to P/21/1901).  The determining
issues in the consideration of this application are its compliance with the Development
Plan. 
10.2. Principle of Development 
The application site is located in a Core Industrial and Business Area therefore NPF4
Policy 26 Business and Industry and SLLDP2 Policy 8 Employment are applicable. 
Any proposed residential development would also require to be justified in terms of
Policy ICD2 Non-conforming Uses in Core Industrial/Business Areas.  In this instance
the previous planning consent (P/21/1901) accepted the principle of residential
development at this site as being acceptable.  This application essentially is a
substitution to previously consented house types (resulting in a reduction in numbers
from 71 to 64) and associated road alignment/alterations. 
10.3. Climate Change 
NPF4 Policy 1 Tackling the Climate and Nature Crises and NPF4 Policy 2 Climate
Mitigation and Adaptation aim to ensure that new developments minimise and mitigate
against climate change and the generation of greenhouse gases.  NPF4 Policy 3 -
Biodiversity aims to protect biodiversity, reverse biodiversity loss, deliver positive
effects from development and strengthen nature networks.  The proposed
development will redevelop previously developed vacant land bringing it back into use. 
The site is within walking distance of Cambuslang Town Centre, Cambuslang Train
Station and local bus services.  The development will not result in any loss of trees
and will incorporate structural planting and additional trees within the development. 
The site is not on peatland or carbon rich soil or in a flood risk area.  It is therefore
considered that the proposal is consistent with Policy 1, 2 and 3 of the NPF4. 
10.4 SLLDP2 Policy 2 Climate Change aims to ensure that new developments minimise
and mitigate against climate change and the generation of greenhouse gases.  The
proposed residential development is located within a reasonable distance of existing
health, community, and retail facilities in Cambuslang, with public transport provided
for rail and various bus services in the wider area.  The proposed dwellings incorporate
measures to improve the sustainability of the development and mitigate against
climate change.  It is therefore considered that the proposal is consistent with Policy
2 of the adopted local development plan. 
10.5. Layout, Siting and Design 
NPF4 Policy 14 Design, Quality and Place aims to encourage, promote, and facilitate
well designed development that makes successful places by taking a design-led
approach and applying the Place Principle.  It sets out six qualities of successful
places.  The proposal is consistent with these qualities and is therefore considered to
be consistent with Policy 14 of the NPF4. 
10.6 NPF4 Policy 15 Local Living and 20 Minute Neighbourhoods aims to encourage,
promote and facilitate the application of the Place Principle and create connected and
compact neighbourhoods.  As set out above, the proposed residential development is
located within a reasonable distance of existing health, community, and retail facilities
in Cambuslang, with public transport provided for rail and various bus services in the
wider area.  The proposal is therefore considered to be consistent with Policy 15 of
the NPF4. 
126

Page 127

10.7 NPF4 Policy 16 Quality Homes aims to encourage, promote and facilitate the delivery
of more high quality, affordable and sustainable homes, in the right locations, providing
choice across tenures that meet the diverse housing needs of people and
communities.  It states that development proposals for new homes on land allocated
for housing in local development plans (LDPs) will be supported.  As set out above,
the site is located within the existing settlement on an allocated housing site.  The
proposed development is of a high-quality design and materials and forms part of a
wider development which provides a range of housing sizes.  The proposal is therefore
considered to be consistent with Policy 16 of the NPF4. 
10.8 Policy 5 Development Management and Policy DM1 New Development Design of the
Local Development Plan state that all planning applications should take fully into
account the local context and built form in terms of layout, scale, massing, design and
external materials.  The principle of redeveloping the application site for residential use
has already obtained planning consent when it was established that the residential
development would result in a development that is of an appropriate scale that would
respect the landscape character of the area.  The proposed substitution of house types
and the proposed mix of house styles, external materials, size of properties and
development layout are acceptable.  Additionally, the proposed development would
not have any significant impact in respect of overshadowing or privacy that would
justify refusal of the application.  On balance, the proposed development would have
no significant adverse impact on residential amenity of the area that would merit
refusal of the application.  In relation to the associated road reconfiguration, Roads
and Transportation Services have no objections.  It is therefore considered that the
proposal is consistent with Policy 5 and Policy DM1 of the adopted Local Development
Plan. 
10.9 The previous planning consent also established that the proposal raised no issues in
relation to Policy 13: Green Network and Greenspace of the South Lanarkshire Local
Development Plan because the railway line will remain open and form a landscape
buffer which continues the green corridor along the edge of the railway.  The area to
the north forms part of the wider open space area which will be landscaped with a
natural/wild planting mix.  The details of this can be required to be submitted for
approval under a landscape condition.  Both areas of Green Network will be retained
continuing the existing green network links through the site and beyond along the
railway and River Clyde corridors.  The imposition of said conditions is applicable to
the current application and, therefore, the proposal complies with Policy 13. 
10.10. Technical Matters 
NPF4 Policy 22 aims to strengthen resilience to flood risk by promoting avoidance as
a first principle and reducing the vulnerability of existing and future development to
flooding.  It is noted that the previous consented proposal included a sustainable
drainage system which links to the wider development SUDs system and drainage
basin.  The applicants submitted a Drainage Strategy and the Flood Risk Management
Team advised that they had no objections to the proposed development subject to
conditions in relation to the implementation of a Sustainable Drainage Design
designed and independently checked in accordance with the Council’s SUDS Design
Criteria Guidance.  Taking the above into account and subject to the imposition of the
same conditions, it is considered that the proposal is acceptable with regard to the
requirements of Policy 22 of NPF4. 
10.11 With regard to road safety, Policy 15 - Travel and Transport requires all new
development proposals to consider the resulting impacts of traffic growth.  The impact
of the proposal on the local road network and in terms of parking provision has been
fully assessed by Roads and Transportation Services who have offered no objections,
127

Page 128

subject to conditions.  The proposal can therefore be considered to comply with Policy
15 of the adopted LDP. 
10.12 In terms of Policies 16, SDCC2 and SDCC3 it is noted that the previous consented
proposal included a sustainable drainage system which links to the wider development
SUDs system and drainage basin.  The applicants submitted a Drainage Strategy and
the Flood Risk Management Team advised that they have no objections to the
proposed development subject to conditions in relation to the implementation of a
Sustainable Drainage Design designed and independently checked in accordance
with the Council’s SUDS Design Criteria Guidance.  Taking the above into account
and subject to the imposition of the same conditions, it is considered that the proposal
is acceptable with regard to the requirements of Policies 16, SDCC2 and SDCC3 of
the adopted LDP. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant Full Planning Permission subject to the following conditions:-  
01.  Details of the phasing of the development shall be submitted to the Council for
approval, and no work shall begin until the phasing scheme has been approved in
writing.  Following approval, the development shall be implemented in accordance with
the approved scheme.   
Reason: In order to retain effective planning control. 
02. That before any work commences on the site a scheme of landscaping shall be
submitted to the Council as Planning Authority for written approval and it shall include:
(a) an indication of all existing trees and hedgerows plus details of those to be retained
and measures for their protection in the course of development; (b) details and
specification of all trees, shrubs, grass mix, etc., including, where appropriate, the
planting of fruit/apple trees; (c) details of any top-soiling or other treatment to the
ground; (d) sections and other necessary details of any mounding, earthworks and
hard landscaping; (e) proposals for the initial and future maintenance of the
landscaped areas; (f) details of the phasing of these works; and no work shall be
undertaken on the site until approval has been given to these details.   
Reason: In the interests of the visual amenity of the area. 
03. That the approved landscaping scheme shall be completed to the satisfaction of the
Council as Planning Authority during the first available planting season following
occupation of the building(s) or completion of the development hereby approved,
whichever is the sooner. 
Reason: In the interests of amenity. 
04. That before any development commences on site or before any materials are ordered
or brought to the site, details and samples of all materials to be used as external
finishes on the development shall be submitted to and approved by the Council as
Planning Authority. 
Reason: In the interests of amenity and in order to retain effective planning control.  
128

Page 129

05. That before development starts, full details of the design and location of all fences and
walls, including any retaining walls, to be erected on the site shall be submitted to and
approved by the Council as Planning Authority.   
Reason: These details have not been submitted or approved. 
06. That before any of the dwellinghouses situated on the site upon which a fence is to be
erected is occupied, the fence or wall for which the permission of the Council as
Planning Authority has been obtained under the terms of Condition 5 above, shall be
erected.   
Reason: In order to retain effective planning control. 
07. That before any development commences on site, details of facilities for the storage
of refuse within the site, including design, location, external finishes and access for its
uplift, shall be submitted to and approved in writing by the Council as Planning
Authority.  No dwelling unit shall be occupied until these facilities have been provided
in accordance with the approved scheme or such alternative as may be agreed in
writing with the Council as Planning Authority.   
Reason: To ensure that adequate refuse arrangements are provided that do not
prejudice the enjoyment of future occupiers of the development or neighbouring
occupiers of their properties, to ensure that a satisfactory external appearance is
achieved and to ensure that appropriate access is available to enable refuse collection. 
08. That the use of the garages hereby permitted shall be restricted to private use
incidental to the enjoyment of the dwellinghouse on the site and no commercial activity
shall be carried out in or from the garage.   
Reason:  To retain effective planning control and safeguard the amenity of the area. 
09. That prior to the commencement of development, details of the land drainage works
shall be submitted to and approved by the Council as Planning Authority.   
Reason: To ensure the provision of a satisfactory land drainage system. 
10. That the required drainage scheme shall be completed in accordance with the
approved details prior to the occupation of any house hereby approved.   
Reason: To ensure the provision of a satisfactory land drainage system. 
11. That before works start on each phase of the development the applicant shall provide
written confirmation from Scottish Water to the Council as Planning Authority that each
phase of the development can be satisfactorily served by a sewerage scheme
designed in accordance with Scottish Water's standards. 
Reason: To ensure the provision of a satisfactory sewerage system. 
12. That no development shall commence until details of surface water drainage
arrangements (including maintenance responsibilities) have been submitted to and
approved in writing by the Council as Planning Authority; such drainage arrangements
will require to comply with the principles of sustainable urban drainage systems and
with the Council's Sustainable Drainage Design Criteria and requirements
(Appendices C, D and E).  
129

Page 130

Reason: To ensure that there will be no increased risk of flooding to land and
properties either on-site or downstream due to impedance of flood flows, increased
surface water run-off and/or reduction of flood storage capacity. 
13. That prior to the construction of any dwelling house, surface water drainage works
shall be completed in accordance with the details submitted to and approved by the
Council as Planning Authority, under the terms of Condition 12 above.   
Reason: To ensure that there will be no increased risk of flooding to land and
properties either on-site or downstream due to impedance of flood flows, increased
surface water run-off and/or reduction of flood storage capacity. 
14. All surface or foul water arising from the development must be collected and diverted
away from Network Rail Property. (Any Sustainable Urban Drainage Scheme should
not be sited within 10 metres of railway infrastructure and should be designed with
long term maintenance plans which meet the needs of the development).   
Reason: To ensure the provision of a satisfactory land drainage system. 
15. If not already in place, the applicant must provide a suitable trespass proof fence of at
least 1.8 metres in height adjacent to Network Rail's boundary and provision for the
fence's future maintenance and renewal should be made.  We recommend a 1.8 metre
high 'rivetless palisade' or 'expanded mesh' fence.  Network Rail's existing boundary
measure must not be removed without prior permission.   
Reason:  In the interest of public safety. 
16. Where trees/shrubs are to be planted adjacent to the railway boundary these should
be positioned at a minimum distance from the boundary which is greater than their
predicted mature height.  Certain broad leaf deciduous species should not be planted
adjacent to the railway boundary.   
Reason:  In the interest of public safety. 
17. That prior to occupation of the first dwelling house the developer will submit for the
written approval of the Council, as Planning Authority, a Residential Travel Plan which
shall include a plan highlighting walking and cycling connections from the site to
existing infrastructure together with nearby bus stops (boarding and alighting), current
bus service timetables, web link to Traveline Scotland and information on Strathclyde
Partnership for Transport MyBus service.   
Reason:  In the interest of public safety. 
18. That all new residents within the approved site shall be issued by the developer with
a copy of the approved Residential Travel Pack.   
Reason:  In the interest of public safety. 
19. (a) The applicant should be required to undertake a further comprehensive site
investigation, carried out to the appropriate Phase level, to be submitted to and
approved in writing by, the Council as Planning Authority.  The investigation shall be
completed in accordance with advice given in the following:-  
130

Page 131

 Planning Advice Note 33 (2000) and Part IIA of the Environmental Protection Act
1990 (as inserted by section 57 of the Environment Act 1995)
 Contaminated Land Report 11 - 'Model Procedures for the Management of Land
Contamination (CLR 11) - issued by DEFRA and the Environment Agency
 BS 10175:2011 - British Standards institution 'The Investigation of Potentially
Contaminated Sites - Code of Practice' 
(b) If the Phase 1 investigation indicates any potential pollution linkages, a Conceptual
Site Model must be formulated and these linkages must be subjected to risk
assessment.  If a Phase 2 investigation is required, then a risk assessment of all
relevant pollution linkages using site specific assessment criteria will require to be
submitted. 
(c) If the risk assessment identifies any unacceptable risks, a detailed remediation
strategy will be submitted to and approved in writing by the Council as Planning
Authority.  No works other than investigative works shall be carried out on site prior to
receipt of the Council's written approval of the remediation plan.  The proposed
remediation strategy shall include, however, not be limited to, details of:- 
- a suitable capping layer of a minimum 600mm with a minimum of 300mm topsoil with
the remainder being made up by the use of suitable subsoil
- how the identified asbestos containing material on site will be removed from the site
- prior to any material being re-used or imported onto the site, full details of the
assessment criteria and sampling frequency that would adequately demonstrate the
suitability for use of any site won material or to import material.  It shall also confirm
that the top 300mm is free from metals, plastic, wood, glass tarmac, paper and
odours. 
No works are to commence prior to the site investigation being submitted in writing to
and approved by the Council as Planning Authority. 
Reason: To avoid unacceptable risks to human health and the environment, to ensure
that the land is remediated and made suitable for its proposed use. 
20. (a) Remediation of the site shall be carried out in accordance with the approved
remediation plan prior to the proposed development being brought into use.  Any
amendments to the approved remediation plan shall not be implemented unless
approved in writing by the Council as Planning Authority. 
(b) On completion of the remediation works, the developer shall submit a completion
report to the Council as Planning Authority, confirming that the works have been
carried out in accordance with the approved remediation plan and that the works have
successfully reduced these risks to acceptable levels.  This report will include a
verification report containing details of the source of the material and appropriate test
results to demonstrate its suitability for use. 
(c) Any previously unsuspected contamination which becomes evident during the
development of the site shall be brought to the attention of the Council as Planning
Authority within one week or earlier of it being identified.  A more detailed site
investigation to determine the extent and nature of the contaminant(s) and a site-
specific risk assessment of any associated pollutant linkages, shall then require to be
submitted to and approved in writing by the Council as Planning Authority. 
Reason: To avoid unacceptable risks to human health and the environment, to ensure
that the land is remediated and made suitable for its proposed use. 
131

Page 132

21. The applicant shall ensure that (prior to the development becoming occupied) the
neighbourhood noise levels (including noise from road traffic, railway noise and both
industrial and commercial noise sources) comply with the following:- 
Part 1 
Between the hours of 08:00 and 20:00 the measured noise rating level emitted from
any pre-existing industrial or commercial premises (LAr,1hr) shall not exceed the
background noise level (LA90,30 min) by more than 4dB within the curtilage of the
new residential development.  This shall be measured in accordance with British
Standard BS 4142:2014 - Method for Rating and Assessing Industrial and Commercial
Sound at the proposed development.  Between the hours of 20:00 and 08:00 the noise
rating level emitted from any pre-existing industrial or commercial premises (LAr,15
min) shall not exceed the background noise level (LA90,30min) by more than 4dB. 
This shall be measured in accordance with BS4142:2014 at the proposed
development. 
Part 2 
The internal noise levels shall comply with BS 8233:2014 Guidance on sound
insulation and noise reduction for buildings as follows:- 
a) An internal LAeq,16hr of 40dB daytime (07:00-23:00) and an internal LAeq,8hr
of 30dB night-time (23:00-07:00)
b) The internal LAmax shall not exceed 45dB night-time (23:00-07:00)
c) The external levels shall not exceed an LAeq,16hr of 50dB daytime in any
garden amenity areas, when measured free-field 
Part 3 
The Internal Noise Rating Values, within the residential property and resultant from the
neighbourhood (industrial and commercial) and neighbour noise (installed services),
shall not exceed:- 
 NR25 between 23.00hrs and 08.00hrs
 NR35 between 08.00hrs and 23.00hrs 
The mitigation measures set out in the submitted "Acoustic Design Statement - Parcel
4, Former Hoover Site, Cambuslang" Bureau Veritas June 2022 must be adopted in
full to the satisfaction of the Council as Planning Authority. 
Reason:  To minimise noise disturbance for occupants of the residential properties. 
22. Prior to development commencing on site, a scheme for the control and mitigation of
dust shall be submitted to and approved in writing by the Council as Planning Authority. 
No changes to the approved scheme shall take place unless agreed in writing by the
Council as Planning Authority.  The scheme shall thereafter be implemented in
accordance with a programme to be agreed in writing with the Council as Planning
Authority. 
Reason:  To minimise the risk of nuisance from dust to nearby occupants.  
132

Page 133

23. The development to which this permission relates shall be begun no later than the
expiration of three years beginning with the date of grant of this decision notice. 
Reason: To comply with Section 58(1) of the Town and Country Planning (Scotland)
Act 1997 (as amended). 
24. That prior to the commencement of works on site, a Traffic Management Plan (TMP)
for that construction phase with information such as, but not limited to, construction
phasing, site deliveries routing/timings, construction compound layout, turning
facilities, site car parking for visitors and site operatives and wheel washing facilities
shall be submitted to and approved by the Council as Planning Authority.  The TMP
shall include a Travel Plan element to encourage less reliance on individual private
car trips to the site for those personnel involved in construction activities on a routine
basis and those attending through the course of site inspections and site meetings. 
The TMP shall be produced in consultation with the Council's Roads and
Transportation Service. 
Reason: In the interests of traffic and public safety. 
25. The recommendations contained within the approved Traffic Management Plan shall
be implemented and adhered to at all times.  The developer shall notify the Council in
writing, as soon as reasonably practical, of any proposed changes in construction
activities where these will have an impact on the approved TMP.  The developer will
consult with the Council, as Roads Authority to agree in writing any changes to the
TMP, and thereafter adhere to and implement the agreed changes to the satisfaction
of the Council as Planning Authority. 
Reason: In the interests of traffic and public safety. 
26. That unless otherwise agreed, the applicant shall undertake an invasive weed survey,
which shall include nuisance weeds such as Horsetail, and submit the findings of the
survey along with their proposed remediation strategy, all for the written approval of
the Council as Roads and Planning Authority, prior to commencement on site of any
topsoil stripping or other earthworks.  That no invasive weeds or nuisance weeds shall
be permitted below or within influencing distance of the public road.  Once approved,
all works shall be progressed in accordance with the agreed remediation strategy. 
Reason: To remove the presence of invasive weeds from the site and ensure the site
is suitable for development. 
27. That, unless otherwise agreed in writing with the Council as Planning Authority,
provision shall be made for electrical charging points within the development for motor
vehicles and mobility scooters.  Prior to any works commencing on site details of the
proposed arrangements shall be submitted and agreed in writing with the Council as
Planning Authority.  Thereafter the scheme shall be implemented.   
Reason: To ensure the provision of appropriate facilities on site. 
28. That before the development hereby approved is completed or brought into use, all of
the parking spaces shown on the approved plans shall be laid out, constructed to the
specification of the Council as Planning Authority. 
Reason: To ensure the provision of adequate parking facilities within the site.  
133

Page 134

29. That, before any dwellinghouse within the development hereby approved is completed
or brought into use, the first two metres of the associated driveway shall be surfaced,
trapped and sealed to prevent any deleterious material or water from leaving the
carriageway and entering the driveway, to the satisfaction of the Council as Roads and
Planning Authority.   
Reason: In the interests of road safety. 
30. That before any work commences on the site a scheme for the provision of equipped
play area(s) within the application site shall be submitted to the Council as Planning
Authority for written approval and this shall include :(a) details of the type and location
of play equipment, seating and litter bins to be situated within the play area(s); (b)
details of the surface treatment of the play area, including the location and type of
safety surface to be installed; (c) details of the fences to be erected around the play
area(s); and (d) details of the phasing of these works.   
Reason: To ensure the provision of adequate play facilities within the site and in order
to retain effective planning control. 
31.  That prior to the completion or occupation of 35 dwellinghouses within the
development, all of the works required for the provision of equipped play area(s)
included in the scheme approved under the terms of Condition 4 above, shall be
completed, and thereafter, that area shall not be used for any purpose other than as
an equipped play area.   
Reason: In order to retain effective planning control. 
12 Reason for Decision
12.1. The proposal would have no significant adverse impact on amenity, public safety or
the local environment and complies with the provisions of Policies 1, 2, 3, 14, 15, 16,
22 and 26 of the National Planning Framework 4 and Policies 2, 5, 8, 13, 15, 16,
SDCC2, SDCC3, DM1 and ICD2 of the adopted South Lanarkshire Local
Development Plan 2 (2021). 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 28 August 2023 
Background Papers
Further information relating to the application can be found online:-
P/23/0431 | Substitution of housetypes from 71 residential units to the erection of 64 residential units,
consisting of 55 detached, semi-detached and terraced and 9 flats, including 17 affordable housing
units and associated road realignment/alterations (amendment to P/21/1901) | Former Hoover Site
Phase 4 Dale Avenue Cambuslang G72 7TZ 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies.  
134

Page 135

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
135

Page 136

136

Page 137

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/23/0748
Proposal:  Erection of 44 semi-detached dwellinghouses and associated works
Site Address:  Site of Former Cairns Primary School
Cairnswell Avenue
Cambuslang 
Applicant:  South Lanarkshire Council
Agent:  Housing and Technical Resources
Ward:  14 Cambuslang East
Application Type:  Full Planning Permission
Advert Type:  Not required
Development Plan
Compliance: 
Yes 
Departures:  None
Recommendation:  Grant subject to Conditions
Legal Agreement:  None required
Direction to
Scottish Ministers 
Not required 
12
137

Page 138

1  Reason for Report
1.1. The application is required to be determined by the Planning Committee under Clause
5.2 of the Decision-Making Process 2015: housing proposals between 11-50 units. 
2  Site Description
2.1.  The application site is located at the former Cairns Primary School, Cairnswell Avenue,
Cambuslang.  The application site is accessed directly off Cairnswell Avenue and is
approximately 1.74 hectares.  The topography of the land drops down from Woodlands
Crescent (south) to Cairnswell Avenue (north) and from St Cadoc’s Primary (west) to
Rosebank Drive (east).  Two storey residential properties are located to the north,
south and east of the site.  There is an existing tree in close proximity to the north/west
boundary.  The application site is within the existing settlement and is designated as
a housing site in the adopted South Lanarkshire Local Development Plan 2 (SLLDP2). 
3  Description of Proposed Developments
3.1. Planning permission is sought for the erection of 44 semi-detached, two storey
dwellinghouses and associated works.  The development would provide 18 two-
bedroom, 16 three-bedroom and 10 four-bedroom layouts.  Each layout is designed
to suit a wide range of tenants.  Facing brick and white render would be the dominant
finish in the development.  Level entry arrangement to the front and rear of all houses
would facilitate access by wheelchair users. 
3.2 The properties would include mechanical ventilation with heat recovery systems,
double glazing, photovoltaic panels fitted to the tiled pitched roofs and enhanced
insulation to minimise household energy costs.  The development is sought as 100%
affordable housing provided by the Council and is identified in the Strategic Housing
Investment Plan (SHIP) for 44 social rent units. 
3.3 Access would be obtained at the northwest of the site, with the access road serving
the development running southeast.  Six units are proposed to be positioned along the
access orientated to face west.  The proposed development would be laid out with
houses primarily positioned on an east-west linear axis featuring 16 houses positioned
in a row to the north, and 22 in a row to the south. 
3.4 A landscaped buffer is proposed along the northern boundary separating the houses
from Cairnswell Avenue.  The southern portion of sloping land which lies out with the
red line site boundary would remain undeveloped, and the tree to the west would be
unaffected by the proposed development.  A substation is proposed to the northwest
corner of the site and an area for overflow and SuDS pond is proposed to the northeast
corner where there is a proposed turning head.  Parking is proposed to the front of
each dwellinghouse and the development seeks to connect to the public water supply
and drainage network. 
4  Relevant Planning History
4.1. Planning application (P/23/0416) was withdrawn 16 June 2023 following concerns
raised in relation to the proposed layout. 
5  Supporting Information 
5.1  Design Statement - this outlines the proposed siting and design of the development. 
6  Consultations
6.1  Environmental Services – No objection subject to the imposition of planning conditions
relating to contamination, residential waste control, dust control and standard
informatives relating to noise and SEPA.
Response: Noted. 
138

Page 139

6.2 Roads and Transportation Services (Development Management) – No objection
subject to standard conditions being attached to any permission granted.
Response: Noted. 
6.3  Roads Flood Risk Management – Conditions in respect of sustainable drainage design
details and completion of SUDs appendices should be attached to any consent. 
Response:  Noted. 
6.4 Scottish Power – No objection.
Response: Noted. 
6.5 Scottish Water – No objection.
Response: Noted. 
7  Representations
7.1. Following the statutory period of neighbour notification and advertisement, 1 objection
has been received.  The issues raised are summarised as follows:- 
Roads Related Matters
⧫ Impact upon traffic safety, junction access
⧫ Increased traffic and noise
⧫ Impact on existing parking 
7.2 The above issues are considered in the assessment below.  This letter is available for
inspection on the planning portal. 
8  Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2 National Planning Framework 4
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
⧫ Policy 1 - Tackling the climate and nature crises
⧫ Policy 2 - Climate mitigation and adaptation
⧫ Policy 3 – Biodiversity
⧫ Policy 14 - Design, quality and place
⧫ Policy 15 - Local living and 20-minute neighbourhoods
⧫ Policy 16 - Quality homes
⧫ Policy 22 - Flood Risk and Water Management 
8.3 South Lanarkshire Local Development Plan 2(2021) 
The application site and associated proposals are affected by the following policies
contained in the South Lanarkshire Local Development Plan 2 (SLLDP2):- 
SLLDP2 Volume 1 Policies
⧫ Policy 1 – Spatial Strategy 
⧫ Policy 2 - Climate Change 
⧫ Policy 3 – General Urban Areas/Settlements
⧫ Policy 5 - Development Management and Placemaking 
139

Page 140

⧫ Policy 11 – Housing
⧫ Policy 15 – Travel and Transport
⧫ Policy 16 – Water Environment and Flooding 
SLLDP2 Volume 2 Policies
⧫ Policy SDCC2 – Flood Risk
⧫ Policy SDCC3 – Sustainable Drainage Systems
⧫ Policy DM1 – New Development Design 
South Lanarkshire Council (SLC) Supporting Planning Guidance
Residential Design Guide 
9  Guidance
9.1. None applicable. 
10.  Assessment and Discussion
10.1. Introduction 
The applicant seeks detailed planning consent for the erection of 44 semi-detached
dwellinghouses and associated works on land forming part of the former Cairns
Primary School.  The determining issues in the consideration of this application
includes the acceptability in principle of the development, its layout, siting and design
and an assessment of the technical matters.  The main consideration in this case is
therefore its compliance with the development plan, which consists of National
Planning Framework 4 (Adopted 2023) and South Lanarkshire Local Development
Plan 2 (Adopted 2021). 
10.2. Principle of Development 
The application site is located within the settlement boundary and is also identified as
a housing site in the SLLDP2 therefore the principle of residential development at this
site is acceptable in principle.  It can be supported by Policies 1, 3 and 5 of the SLLDP2
as it directs development to allocated sites within the settlement.  This is in line with
Policy 16 of NPF4 which supports the development of affordable housing provision
under criteria c (iv) and e.  SLLDP2 Policy 11 – Housing supports housing
developments on identified sites, subject to the proposals according with the other
relevant polices in the development plan.   
10.3. Climate Change 
NPF4 Policy 1 Tackling the Climate and Nature Crises and NPF4 Policy 2 Climate
Mitigation and Adaptation aim to ensure that new developments minimise and mitigate
against climate change and the generation of greenhouse gases.  The proposed
residential development is located within the settlement within a reasonable distance
of existing health, community and retail facilities in Cambuslang, with public transport
provided at the railway station and by various bus services in the wider area.  The
proposed dwellinghouses incorporate measures to improve the sustainability of the
development and mitigate against climate change including the provision of
mechanical ventilation with heat recovery systems, double glazing, photovoltaic
electricity generation, and enhanced insulation to minimise household energy costs. 
Electric vehicle charging will also be incorporated within the development scheme.  It
is therefore considered that the proposal is consistent with Policy 1 and Policy 2 of the
NPF4.  This is further in accordance with SLLDP2 Policy 2 Climate Change which
aims to ensure that new developments minimise and mitigate against climate change
and the generation of greenhouse gases.  
140

Page 141

10.4 NPF4 Policy 3 - Biodiversity aims to protect biodiversity, reverse biodiversity loss,
deliver positive effects from development and strengthen nature networks.  In this
regard, a landscape buffer would be provided to the north of the application site.  Given
the above, it is considered that the proposal would deliver positive effects in respect
of biodiversity, in compliance with Policy 3 of NPF4. 
10.5. Layout, Siting and Design 
NPF4 Policy 14 Design, Quality and Place aims to encourage, promote and facilitate
well designed development that makes successful places by taking a design-led
approach and applying the Place Principle.  It sets out six qualities of successful
places.  The proposal is consistent with these qualities and is therefore considered to
be consistent with Policy 14 of the NPF4. 
10.6 NPF4 Policy 15 Local Living and 20 Minute Neighbourhoods aims to encourage,
promote and facilitate the application of the Place Principle and create connected and
compact neighbourhoods.  The proposed residential development is located within a
reasonable distance of existing health, community and retail facilities in Cambuslang,
with public transport provided for rail and various bus services in the wider area.  The
proposal is therefore considered to be consistent with Policy 15 of the NPF4. 
10.7 NPF4 Policy 16 Quality Homes aims to encourage, promote, and facilitate the delivery
of more high quality, affordable and sustainable homes, in the right locations, providing
choice across tenures that meet the diverse housing needs of people and
communities.  It states that development proposals for new homes on land allocated
for housing in LDPs will be supported.  As set out above, the site is located within the
existing settlement on an allocated housing site.  The proposed development is of a
high-quality design and materials and forms part of a wider development which
provides a range of housing sizes.  The proposal is therefore considered to be
consistent with Policy 16 of the NPF4. 
10.8 Policy 5 Development Management and Policy DM1 New Development Design of the
Local Development Plan state that all planning applications should take fully into
account the local context and built form in terms of layout, scale, massing, design and
external materials.  It is noted that the proposal is for 44 detached dwellinghouses,
associated parking and infrastructure.  The proposed mix of house sizes, the external
materials and development layout are acceptable.  On balance the proposed
dwellinghouses would have no significant adverse impact on residential amenity of the
area that would merit refusal of the application.  Additionally, the proposed
development would not have any significant impact in respect of overshadowing or
privacy that would justify refusal of the application.  It is therefore considered that the
proposal is consistent with Policy 5 and Policy DM1 of the adopted Local Development
Plan. 
10.9 Technical Matters 
NPF4 Policy 22 aims to strengthen resilience to flood risk by promoting avoidance as
a first principle and reducing the vulnerability of existing and future development to
flooding.  The imposition of planning conditions in respect of sustainable drainage
design details and completion of SUDs appendices should be attached to any consent
to ensure that the proposed development would have a sustainable drainage system. 
Taking the above into account, it is considered that the proposal is acceptable with
regard to the requirements of Policy 22 of NPF4 and SLLDP2 Policies 16, SDCC2 and
SDCC3 which relate to any potential flood risk and impact on the water environment
from the proposed development. 
141

Page 142

10.10 Concerns have been expressed regarding the proposed access location, potential
congestion and parking situation in the local area.  Policy 15 - Travel and Transport
requires all new development proposals to consider the resulting impacts of traffic
growth.  The impact of the proposal on the local road network and in terms of parking
provision has been fully assessed by Roads and Transportation Services who have
offered no objections, subject to conditions.  The proposal can therefore be considered
to comply with Policy 15 of the adopted LDP. 
10.11 Conclusion 
In conclusion, it is noted that the principle of residential development of this site is
supported by development plan policies.  Furthermore, given that the proposal will not
result in adverse amenity, environmental or safety impacts, it is considered that the
proposed development is in compliance with the provisions of the relevant policies of
the National Planning Framework 4 and the adopted South Lanarkshire Local
Development Plan 2.  It is therefore considered appropriate for planning permission to
be granted for the proposed development subject to the attached conditions. 
11 Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Grant subject to conditions:- 
01. The development to which this permission relates shall be begun no later than
the expiration of three years beginning with the date of grant of this decision
notice.   
Reason: To comply with Section 58(1) of the Town and Country Planning
(Scotland) Act 1997 (as amended). 
02. That before development starts, full details of the design and location of all
fences and walls, including any retaining walls, to be erected on the site shall
be submitted to and approved by the Planning Authority.  The development
shall thereafter be carried out in accordance with the approved details.   
Reason: To ensure the development is satisfactory in appearance and to
maintain the visual quality of the area. 
03. That no development shall commence on site until the applicant provides
written confirmation from Scottish Water to the Planning Authority that the site
can be satisfactorily served by a sewerage scheme designed in accordance
with Scottish Water's standards.     
Reason: To ensure the provision of a satisfactory sewerage system. 
04.  That no development shall commence until details of surface water drainage
arrangements (including a full drainage assessment and maintenance
responsibilities) have been submitted to and approved in writing by the Council
as Planning Authority; such drainage arrangements will require to comply with
the principles of sustainable urban drainage systems and with the Council's
Sustainable Drainage Design Criteria and requirements (Appendices A, B, C,
D and E). 
The development hereby approved shall not be occupied until surface water
drainage works have been completed in accordance with the details submitted
to and approved by the Council. 
142

Page 143

Reason: To ensure that the disposal of surface water from the site is dealt with
in a safe and sustainable manner, to return it to the natural water cycle with
minimal adverse impact on people and the environment and to alleviate the
potential for on-site and off-site flooding. 
05. That before any work commences on the site, a scheme of landscaping shall
be submitted to the Planning Authority for written approval and it shall include:- 
(a) an indication of all existing trees and hedgerows plus details of those to be
retained and measures for their protection in the course of development; 
(b) details and specification of all trees, shrubs, grass mix, etc., including, where
appropriate, the planting of fruit/apple trees; 
(c) details of any top-soiling or other treatment to the ground; 
(d) sections and other necessary details of any mounding, earthworks and hard
landscaping; 
(e) proposals for the initial and future maintenance of the landscaped areas; 
(f) details of the phasing of these works; and no work shall be undertaken on
the site until approval has been given to these details. 
The approved landscaping scheme shall be completed to the satisfaction of the
Council as Planning Authority during the first available planting season
following occupation of the building(s) or completion of the development hereby
approved, whichever is the sooner. 
Reason: To ensure the appropriate provision of landscaping within the site and
in the interests of the visual amenity of the area. 
06. Prior to commencement of development, the applicant shall be required to
undertake a comprehensive site investigation, carried out to the appropriate
Phase level, to be submitted to and approved in writing to the Planning
Authority.  The investigation shall be completed in accordance with the advice
given in the following:- 
(i) Planning Advice Note 33 (2000) and Part IIA of the Environmental Protection
Act 1990 (as inserted by section 57 of the Environment Act 1995); 
(ii) Contaminated Land Report 11 - 'Model Procedures for the Management of
Land Contamination (CLR 11) - issued by DEFRA and the Environment
Agency; 
(iii) BS 10175:2001 - British Standards institution 'The Investigation of
Potentially Contaminated Sites - Code of Practice'. 
If the Phase 1 investigation indicates any potential pollution linkages, a
Conceptual Site Model must be formulated and these linkages must be
subjected to risk assessment.  If a Phase 2 investigation is required, then a risk
assessment of all relevant pollution linkages using site specific assessment
criteria will require to be submitted. 
If the risk assessment identifies any unacceptable risks, a detailed remediation
strategy will be submitted to and approved in writing by the Council as Planning
Authority.  No works other than investigative works shall be carried out on site
prior to receipt of the Planning Authority’s written approval of the remediation
plan. 
143

Page 144

Reason: To avoid unacceptable risks to human health and the environment, to
ensure that the land is remediated and made suitable for its proposed use. 
07. Further to the requirements of Condition 06 prior to the commencement of
development, a remediation plan shall be submitted to and approved in writing
by the Planning Authority.  Any remediation of the site shall be carried out in
complete accordance with the approved scheme prior to the proposed
development being brought into use.  Any amendments to the approved
remediation plan shall not be implemented unless approved in writing by the
Council as Planning Authority. 
On completion of the remediation works, the developer shall submit a
completion report to the Council as Planning Authority, confirming that the
works have been carried out in accordance with the approved remediation plan
and that the works have successfully reduced these risks to acceptable levels. 
Any previously unsuspected contamination which becomes evident during the
development of the site shall be brought to the attention of the Council as
Planning Authority within one week or earlier of it being identified.  A more
detailed site investigation to determine the extent and nature of the
contaminant(s) and a site-specific risk assessment of any associated pollutant
linkages, shall then require to be submitted to and approved in writing by the
Council as Planning Authority. 
Reason: To avoid unacceptable risks to human health and the environment, to
ensure that the land is remediated and made suitable for its proposed use. 
08. Prior to development commencing on site, a scheme for the control and
mitigation of dust shall be submitted to and approved in writing by the Council
as Planning Authority.  No changes to the approved scheme shall take place
unless agreed in writing by the Council as Planning Authority.  The scheme
shall thereafter be implemented in accordance with a programme to be agreed
in writing with the Council as Planning Authority. 
Reason: To minimise the risk of nuisance from dust to nearby occupants. 
09. That before any of the dwellinghouses hereby approved are occupied, details
of the storage and collection of refuse within the development shall be
submitted to and approved by the Council as Planning Authority.  Thereafter,
prior to the occupation of any dwelling, the approved scheme shall be
implemented to the satisfaction of the Council as Planning Authority. 
Reason: To ensure that adequate refuse arrangements are provided that do
not prejudice the enjoyment of future occupiers of the development or
neighbouring occupiers of their properties, to ensure that a satisfactory external
appearance is achieved and to ensure that appropriate access is available to
enable refuse collection. 
10. Prior to the commencement of development, full details of the visibility,
including forward visibility at the speed bend, must be shown on a plan and
submitted for the written agreement by the Planning Authority. 
144

Page 145

For the avoidance of doubt, no development in connection with the permission
hereby granted shall commence unless visibility of 43m x 2.4m in both
directions along the channel line of the public road has been provided in
accordance with the Council’s Road standards.  The visibility splays shall be
physically formed and all obstructions within the splays shall be removed.   
Once formed, the visibility splays shall be permanently retained thereafter. 
Reason: In the interests of traffic and public safety. 
11. Notwithstanding the permission hereby approved, prior to commencement of
development full details of pedestrian crossing points, vehicular dropped kerbs,
gullies, grit bins and bollards shall be submitted for the written approval by the
Planning Authority in conjunction with Roads Construction Consent. 
Reason: In the interests of traffic and public safety. 
12.  Prior to the commencement of development, full details of the embankment
slopes and drainage of the site shall be submitted for the written agreement by
the Planning Authority.  Once agreed, the works shall be carried out in full
accordance with the agreed scheme. 
Reason: In order to ensure that adequate drainage facilities are provided, and
retained, in the interests of the amenity of the area. 
13. No works in connection with the development hereby approved shall
commence unless a Construction Traffic Management Plan (CTMP) has been
submitted to and approved in writing by the planning authority.  This will include
the route proposed for access to the site for construction and delivery vehicles. 
This should also demonstrate where all deliveries are to be dropped off,
compound, car parking for staff/contractors/visitors and wheel washing
facilities. 
Reason: In the interests of traffic and public safety. 
12 Reason for Decision
12.1. The proposal would have no significant adverse impact on amenity, public safety or
the local environment and complies with the provisions of Policies 1, 2, 3, 14, 15, 16,
and 22 of the National Planning Framework 4 and Policies 1, 2, 3, 5, 11, 15, 16,
SDCC2, SDCC3 and DM1 of the adopted South Lanarkshire Local Development Plan
2 (2021). 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 28 August 2023 
Background Papers
Further information relating to the application can be found online:-
P/23/0748 | Erection of 44 semi-detached dwellinghouses and associated works | Site Of
Former Cairns Primary School Cairnswell Avenue Cambuslang  
145

Page 146

Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
146

Page 147

147

Page 148

148

Page 149

Report
Agenda Item 
Checked
Report to: Planning Committee
Date of Meeting: 5 September 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Reference no:  P/23/0848
Proposal:  Erection of dwellinghouse with associated access and parking (in part
retrospective)
Site Address:  Land 50m SSW of 1 Milton Cottage
Milton Road
Carluke
ML8 5PT
Applicant:  Mr and Mrs David Cornwell
Agent:  Derek Scott
Ward:  01 Clydesdale West
Application Type:  Full Planning Permission
Advert Type:  Non-notification of neighbours and Development Contrary to
Development Plan: Lanark Gazette 26 July 2023
Development Plan
Compliance: 
No 
Departures:  None
Recommendation:  Refuse
Legal Agreement:  Not required
Direction to
Scottish Ministers 
Not required 
13
149

Page 150

1. Reason for Report
1.1. As required by the approved South Lanarkshire Council Planning Application
Decision-Making Process 2015, a request that this otherwise delegated application be
determined by the Planning Committee was received from Councillor David Shearer
and this was agreed by the Head of Planning and Regulatory Services and the Chair
of the Planning Committee. 
2. Site Description
2.1. The application site is located in designated Green Belt to the south-east of Carluke
and is accessed from Milton Road via an existing private access track (approximately
278m in length).  The site itself is roughly triangular and bound on the northern side
by a hedge and private access track, providing pedestrian access to Carluke. 
2.2. The site is relatively level and lies south of an existing building group comprising Milton
Cottages (three separate dwellings) and a modern house built on the site of a
demolished stables block. 
2.3 On a site visit in July 2023 it was noted the dwellinghouse applied for was substantially
completed and appeared to be occupied.  To the west is an area of woodland and to
the east and south lies agricultural land.  Directly to the southeast there are 3 chalets
which have been erected without Planning Permission, a fourth unauthorised chalet
sits further south.  A more detailed timeline of works and changes to the site is included
in Section 4 (Relevant Planning History) and Section 10 (Assessment). 
3. Description of Proposed Development
3.1. Planning permission is sought for the erection of a detached one and a half storey
dwellinghouse (containing 4 bedrooms), finished in stonework, white render and slate
substitute - features include entrance porch, pitched roof dormers with vertical timber
boarding, solar panels and rear roof overhang to create a covered veranda.  The
dwelling would be served by a driveway, parking spaces and a landscaped garden. 
3.2. Private drainage arrangements in the form of a treatment plan and discharge are
detailed in the submitted application form.  However, specific drainage details are not
shown on proposed plans.  A public water supply connection is proposed. 
4. Relevant Planning History
4.1. Pre-Autumn 2021
According to aerial mapping dated December 2004 the application site contained
woodland, a building and open/vacant land.  Photographs of the building are included
within the applicants’ supporting statement. 
4.2. Autumn 2021-2022
The supporting statement details the building was demolished and woodland removed
in autumn 2021.  A planning application (ref P/21/1780) was submitted in October
2021 by Mr Bryan Neil for the erection of three houses on this application site and
additional land to the southwest.  Site photography associated with this application,
taken by an officer in January 2022, show a cleared site with an area of open
compacted gravel to the front with grass to the rear.  This application was withdrawn
in August 2022 prior to determination. 
4.3. Summer 2022-2023
A planning application (ref P/22/1178) was submitted in August 2022 for a single
dwelling which was submitted by Mr and Mrs Cornwell - the same applicant to this
current application.  In September 2022 the site photographs show foundations being
erected.  By June 2023 the dwellinghouse was substantially complete.  This
150

Page 151

application was refused by Planning Committee on 6 June 2023.  That decision has
not yet been appealed to the Department of Planning, Environmental Appeals (DPEA). 
However, the applicant has a right to appeal that decision up until 8 September 2023. 
A Planning Contravention Notice was served on the property by Sherrif Officers on 9
June 2023.  The application being presented to this Committee is a second application,
for the same proposal as previously refused. 
4.4. In addition, it was discovered in September 2022 that 4 chalets (3 directly adjacent
and one further south) had been constructed, on land adjacent to the application site. 
These had been constructed and were being occupied without planning permission. 
Investigations (Ref. ENP/22/0336) commenced in September 2022 to address this
alleged breach of planning control.  The supporting statement submitted details these
works were undertaken by another party and are not in relation to the current
application and/or development. 
5. Supporting Information 
5.1 The applicant submitted the following information to support the application. 
5.2 A covering letter which highlights issues relating to the previous Committee Report
which was presented to Committee on 6 June 2023 and details the personal impact of
further refusal and enforcement proceedings. 
5.3 A supporting statement which sets out details of the site prior to works, the proposed
development and why works took place on site.  It then takes each point of refusal of
the previously submitted application (P/22/1178) in turn.  The main arguments put
forward are that the site is brownfield, forms a homogonous group of buildings, the site
is sustainably located in proximity of Carluke and does not undermine the Green Belt. 
The statement raises issues in relation to the timescale to determine the previous
application, description of the site in the previous report and refers to other applications
determined post adoption of NPF4. 
6 Consultations
6.1 Environmental Services - No objection subject to conditions requiring a contaminated
land investigation/remediation strategy and informatives on construction noise,
nuisance, pest control and a remediation completion report.
Response – noted. 
6.2 Roads Development Management Team - No objections, this would represent the 5th
authorised dwelling off a private road which is acceptable.  The passing places,
visibility and parking spaces are acceptable.  In this instance, the application site is
served from an existing private access and there are currently 4 lawful residential
dwellings using this access.  As such, the proposed additional dwelling proposed
would not trigger the requirement for Roads Construction Consent.  It is noted that
there are also unauthorised chalets adjacent to the application site which are not
considered to contribute to the number of dwellings using the existing access. 
Response – noted.  
6.3 Scottish Water – There is sufficient capacity at the Camps Water Treatment Works
and at the Maudslie Waste Water Treatment for a foul only connection.  For reasons
of sustainability and to protect their customers from potential future sewer flooding,
Scottish Water do not accept any surface water connections into their combined
sewer system. 
Response – noted.  
151

Page 152

7 Representations
7.1. Following the statutory period of neighbour notification and advertisement, no valid
representations have been received. 
8 Development Plan
8.1. Under Section 25 of the Town and Country Planning (Scotland) Act 1997, all
applications must be determined in accordance with the development plan unless
material considerations indicate otherwise. 
8.2. National Planning Framework 4 
National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy. NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. 
National Planning Framework 4 Policies 
 Policy 1 - Tackling the climate and nature crises
 Policy 2 - Climate mitigation and adaptation
 Policy 3 - Biodiversity
 Policy 8 - Green belts
 Policy 9 - Brownfield, vacant and derelict land and empty buildings
 Policy 14 - Design, quality and place
 Policy 15 - Local Living and 20-minute neighbourhoods
 Policy 16 - Quality Homes 
8.3. South Lanarkshire Local Development Plan 2(2021) 
For the purposes of determining planning applications the Council will, therefore,
assess proposals against the policies contained within the adopted South Lanarkshire
Local Development Plan 2 (SLLDP2).  In this regard the application site and
associated proposals are affected by the following policies contained in the SLLDP2:- 
SLLDP2 Volume 1 Policies
 Policy 2 - Climate Change
 Policy 4 - Green Belt and Rural Area
 Policy 5 - Development Management and Placemaking
 Policy 14 - Natural and Historic Development 
SLLDP2 Volume 2 Policies
 Policy GBRA1 - Rural Design and Development
 Policy GBRA9 - Consolidation of Existing Building Groups
 Policy GBRA5 – Redevelopment of previously developed land containing
buildings
 Policy GBRA8 – Development of Gap Sites
 Policy NHE16 - Landscape 
9 Guidance
9.1 South Lanarkshire Council (SLC) Supporting Planning Guidance
 Electric Vehicle Charging Points August 2022
 South Lanarkshire Landscape Character Assessment 2010
 South Lanarkshire Validating Local Landscape Designations 2010  
152

Page 153

10 Assessment and Discussion
10.1 Introduction
The applicant seeks detailed planning permission, in part retrospect, for the erection
of a dwellinghouse with associated access and parking. 
10.2 The main issues to be addressed in the determination of this application include the
acceptability in principle of the proposed development.  The policies contained within
National Planning Framework 4 and the South Lanarkshire Local Development Plan
2 are the main considerations in this case, together with an assessment of any other
material planning considerations. 
10.3 Principle of Development
The site is located within the Green Belt and the supporting statement advises that the
site is brownfield.  The policies relating to the Green Belt and brownfield land should
be considered in the first instance in order to assess and establish the principle of
development.   
10.4 NPF4 Policy 8 Green Belts seeks to encourage, promote and facilitate compact urban
growth and use the land around our towns and cities sustainably.  The policy is twofold,
part (i) sets out circumstances where various types of development in the Green Belt
can be considered acceptable.  The proposal is for a single dwelling, it is not in relation
for accommodation for a key worker, it does not involve the one for one replacement
of an existing dwelling nor does it relate to the reuse of a historic environment asset. 
The proposal fails to meet any of the criteria in part (i) of the policy.  Therefore, it is not
appropriate to assess the proposal against part (ii).  As such, the proposal is contrary
to Policy 8 of National Planning Framework 4. 
10.5 NPF4 Policy 3 Biodiversity seeks to protect biodiversity, reverse biodiversity loss,
deliver positive effects from development and strengthen nature networks.  It requires
that developments contribute to the enhancement of biodiversity and integrate nature-
based solutions where possible.  The application site was vacant land which was in
the process of naturalising before unauthorised works commenced.  As such, the site
had biodiversity value with significant capacity for enhancement.  Whilst the current
proposal would see the creation of landscaped garden ground, there is no information
or specification detailed which would demonstrate biodiversity enhancement of these
garden areas in comparison to the larger naturalised site.  Given that the current
proposal does not propose any specific measures to conserve, restore and enhance
biodiversity, it is contrary to Policy 3 of National Planning Framework 4 
10.6 NPF4 Policy 9 Brownfield, vacant and derelict land and empty buildings aims to
encourage, promote and facilitate the reuse of brownfield, vacant and derelict land
and empty buildings to help reduce the need for greenfield development.  The
supporting statement purports the land is brownfield land.  This application is the
second application following the previous refusal.  It should also be noted that the
proposal is in part retrospective, as the dwelling is now substantially complete. 
Therefore, in assessing whether the land is brownfield, the condition of the land will
be taken at the point before unauthorised work commenced, i.e., prior to
August/September 2022. 
10.7 As advised earlier in this report, the application site in 2021 was cleared of a building
and woodland.  The supporting statement details the trees were removed due to a
fungal disease and had only related to 15% of the site.  The supporting statement
advises the remainder of the site was hardstanding.  The site photos taken by a
Planning Officer in January 2022 show this hardstanding area to be an area of
153

Page 154

compacted gravel, a permeable covering, located at the front of the site.  There is
grass evident in these photographs to the rear of the site and this remains the case in
July 2023 with the land immediately to the rear of the under-construction house, and
which would form its garden, being a grass field. 
10.8 Policy 9 states that when determining whether the re-use of a brownfield site is
sustainable, the biodiversity value of the brownfield land which has naturalised should
be considered.  Given the permeable open nature of the hardstanding at the front of
the site, which was already naturalising, the grass to the rear, and the surrounding
context of adjacent, agricultural land, hedges and woodland, the site could have easily
naturalised if the unauthorised development had not occurred and increased in
biodiversity value.  As set out above, the site does not comply with Policy 8 Green Belt
and is not considered a sustainable location for residential use.  Consequently, the
proposal is not considered a sustainable reuse of brownfield land.  It is not in a
sustainable location and the semi-naturalised state of the site (prior to recent
unauthorised development) would have resulted in an increased biodiversity value. 
The proposal is contrary to Policy 9 of National Planning Framework 4. 
10.9 NPF4 Policy 14 – Design, Quality and Place advises that proposals will be supported
where they are consistent with the 6 qualities of successful places.  It confirms that
proposals which are poorly designed, detrimental to the amenity of the surrounding
area or inconsistent with the 6 qualities of place will not be supported.  The proposed
erection of a single dwellinghouse in the green belt, contrary to policies designed to
preserve that green belt, is not considered to be characteristic of a sustainable place
and, as such, is contrary to Policy 14 of NPF4. 
10.10 NPF4 Policy 15 – Local Living and 20-minute neighbourhoods seeks to create
connected and compact neighbourhoods where people can meet the majority of their
daily needs within a reasonable distance of their home, preferably by using sustainable
transport options.  A site placed just beyond the settlement boundary, would have
access to a significant number of the criteria listed in Policy 15.  However, it should
also be noted that encouraging new homes just outwith approved settlement
boundaries, within the designated green belt, leads to exactly the sort of sprawled out,
unconnected residential areas lacking facilities and services that this policy is
designed to avoid.  Whilst residents might indeed have access to many of the
facilities/benefits of local living identified in the policy, the development itself would run
directly contrary to the policy intent, namely, to create connected and compact
settlements and mixed-use neighbourhoods.  As such, the proposal is not considered
compatible with the intent of Policy 15 of NPF4. 
10.11 NPF4 Policy 16 – Quality Homes seeks to encourage, promote, and facilitate the
delivery of high-quality homes, in the right locations.  It advises that development
proposals for new homes on land not allocated for housing in the Local Development
Plan (LDP) will only be supported in limited circumstances.  The proposed housing
development is not consistent with the spatial strategy and other relevant policies in
the plan and does not involve; delivery of a site in the housing land pipeline; housing
in the rural area; an opportunity within an existing settlement boundary or a proposal
for affordable homes.  As such, the proposal is directly contrary to Policy 16 – Quality
Homes of NPF4. 
10.12 In terms of Local Development Plan policy, the application site lies within the Green
Belt and is subject to assessment against Policy 4 - Green Belt and Rural Area of the
adopted SLLDP2.  The policies in the SLLDP2 which can be used to justify new
residential buildings in the green belt are GBRA5 – Redevelopment of previously
154

Page 155

developed land containing buildings, GBRA8 – Development of Gap Sites and GBRA9
– Consolidation of building groups.   
10.13 The proposed dwelling does not need to be in the countryside.  It is not sustainable to
incrementally add additional housing to this Green Belt location.  None of the ‘GBRA’
exceptions apply in this instance as the proposal is on a site with no remaining
buildings; does not constitute the consolidation of an existing building group (being
distinct from the buildings to the north and in effect extending the group south of the
access track, rather than consolidating it); and which is not a gap site (having open
countryside on 3 sides).  As, such the proposal is contrary to Policy 4 Green Belt and
Rural Area and Green Belt and Rural Area Policies GBRA5, GBRA8 and GBRA9 of
SLLDP2. 
10.14 As advised above, the proposal is also considered contrary to NPF4 Policy 9
Brownfield, vacant and derelict land and empty buildings, however, even if the
proposal had complied with Policy 9, this would not be considered sufficient to
outweigh the provisions of NPF4 Policy 8 Green Belt.  Whilst Policy 9 addresses
brownfield land generally, Policy 8 specifically applies to green belt areas and, as
such, takes precedence in the determination of planning applications in the green belt. 
10.15. Climate Change
NPF4 Policy 1 requires that when considering all development proposals, significant
weight will be given to the global climate and nature crises.  NPF4 Policy 2 Climate
Change and Mitigation expands on this requiring all new developments to be sited and
designed (1) to minimise lifecycle greenhouse gas emissions as far as possible and
(2) to adapt to the current and future risks from climate change.  The Chief Planner
letter (4 February 2023) confirms that at this stage quantitative assessments are not
expected for all applications.  In the absence of a methodology for measuring the
emissions which would result from the emissions of the proposed buildings, it is
considered appropriate at this time to instead consider the general sustainability of the
proposal in land-use planning terms (whether the use of this site as housing land is
supportable when assessed against other relevant policies in NPF4) and use that as
an indicator in whether or not it is likely to minimise emissions and adapt to current
and future impacts of climate change.  It has been detailed above the principle of
development at this site is not established. 
10.16. Policy 2 Climate Change of SLLDP2 seeks to minimise and mitigate against the
effects of climate change by considering various criteria including: being sustainably
located; reuse of vacant and derelict land; avoidance of flood risk areas; incorporating
low and zero carbon generating technologies; opportunities for active travel routes
and trips by public transport; electrical vehicle recharging infrastructure and where
appropriate connection to heat networks. 
10.17. The site is not at risk of flooding.  If the proposal was considered acceptable the
applicant could be asked to submit further details of low carbon technology; a tree
planting scheme and the installation of electric vehicle charging points for the
approval of the planning authority.  In consideration, the proposals would not
undermine the objectives of Policy 2 of the South Lanarkshire Local Development
Plan 2 (2021). 
10.18. Layout, Siting and Design
Given that the principle of development is not considered to be acceptable in this
location, the design of the proposed dwelling in terms of Policies 5 ‘Development
Management and Place Making’ and GBRA1 ‘Rural Design and Development’ of
155

Page 156

SLLDP2 is not considered to be a determining factor in the assessment of this
application. 
10.19. Landscape Impact
Policy 14 – Natural and Historic Environment of SLLDP2 states that the Council will
assess all development proposals in terms of their impact on the natural and historic
environment, including landscape.  The Council will seek to protect important natural
and historic sites and features from adverse impacts resulting from development,
including cumulative impacts.  Category 3 areas include Special Landscape Areas
where development which would have a significant adverse impact following the
implementation of mitigation measures will only be permitted where the effects are
outweighed by significant social or economic benefits.   
10.20. Policy NHE16 – Landscape of the SLLDP2 advises that development proposals within
Special Landscape Areas will only be permitted where they can be accommodated
without having an unacceptable significant adverse effect on the landscape character,
scenic interest and special qualities and features for which the area has been
designated.  All proposed development should consider the detailed guidance
contained in the South Lanarkshire Landscape Character Assessment 2010. 
10.21. The site falls within the Urban Fringe Farmlands where further incremental release of
land for residential development should be carefully planned and the use of vernacular
building designs is encouraged.  The proposed development reflects traditional rural
architecture with appropriate contemporary features.  No historic or landscape
features which contribute to landscape quality will be affected.  In view of these
circumstances the proposal complies with policies 14 and NHE16 of SLLDP2. 
10.22 Conclusion 
In summary, taking all the above into account, it is considered that the proposed
development would constitute inappropriate development with regards to the sites
Green Belt designation and there are no exceptions to policy, in either NPF4 or
SLLDP2, which would justify a dwellinghouse in this location.  As such, the proposed
development fails to adhere to the provisions of the development plan, with specific
regard to Policies 1, 2, 3, 8, 9, 14, 15 and 16 of National Planning Framework 4
(adopted 2023) and Policies 4, GBRA5, GBRA8 and GBRA9 of the South Lanarkshire
Local Development Plan 2 (adopted 2021) and there are no material considerations
which would outweigh this variance with the development plan.  In view of this, it is
recommended that the application is refused planning permission. 
11. Recommendation and Conditions
11.1. The Committee is asked to agree the following recommendation:- 
Refuse Planning Permission for the reasons outlined below:- 
01. The proposal would be contrary to Policy 8 – Green belts of National Planning
Framework 4 as it does not meet the criteria set out in the policy for green belt
development and as such fails to encourage, promote and facilitate compact
urban growth and use the land around our towns and cities sustainably. 
02. The proposal would be contrary to Policies 4 - Green Belt and Rural Area of the
South Lanarkshire Local Development Plan 2 as it would constitute an
inappropriate form of development, that cannot be justified under policies
GBRA5, GBRA8 or GBRA9 and which adversely affects the character of the
Green Belt at this location.  
156

Page 157

03. The proposal would be contrary to Policy 9 - Brownfield, vacant and derelict land
and empty buildings of National Planning Framework 4 as the site no longer has
any buildings upon it, has reverted to a naturalised state with biodiversity value
and is not allocated housing land. 
04. The proposal would be contrary to Policy 3 – Biodiversity of National Planning
Framework 4 as it does not include appropriate measures to conserve, restore
and enhance biodiversity, in accordance with national and local guidance. 
05. The proposal would be contrary to Policy 14 – Design, Quality and Place of
National Planning Framework 4 as it is not consistent with the 6 qualities of
successful places. Specifically, it fails to achieve the characteristics of a
sustainable place. 
06. The proposal would be contrary to Policy 15 - Local Living and 20 minute
neighbourhoods of National Planning Framework 4 as it fails to create connected
and compact settlements and mixed-use neighbourhoods. 
07. The proposal would be contrary to Policy 16 – Quality Homes of National
Planning Framework 4 as it does not constitute the delivery of high quality homes
in the right locations as set out in the policy criteria. 
David Booth
Executive Director (Community and Enterprise Resources) 
Date: 28 August 2023 
Background Papers
Further information relating to the application can be found online:-
P/23/0848 | Erection of dwellinghouse with associated access and parking (in part
retrospective) | Land 50M SSW Of 1 Milton Cottage Milton Road Carluke ML8 5PT 
Corporate Considerations
The report raises no impacts or risks in terms of equalities or financial implications.  Any
implications in terms of climate change, sustainability or the environment will have been
considered above in terms of the relevant national and local policies. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tel:  01698 454867
E-mail:  planning@southlanarkshire.gov.uk 
157

Page 158

158